Cabinet
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
02 June 2026 at 14:30 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.   Where possible, the meeting will be live-streamed
and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 28 April
2026 will be confirmed and the Minutes signed in accordance with
Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland) Act
1973 (copy enclosed).
EDUCATION ITEMS FOR DECISION
Reports by the Executive Director (Education)
3 Planned temporary closure of educational provisions
Submit a report by the Executive Director (Education)  outlining a standardised
procedure in connection with the planned temporary closure of educational
provisions, compliant with updated Scottish Government Guidance (copy
enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
4 Review of ELC Sustainable Rates for Funded Providers
Submit a report by the Executive Director (Education)  seeking approval from
Cabinet to increase the sustainable rate of payment to funded providers of early
learning and childcare (ELC) in North Ayrshire who are contracted by the
Council to deliver funded ELC to eligible 2-5-year-olds (copy enclosed).
5 School Leavers’ Attainment and Achievement 2025
Submit a report by the Executive Director (Education)  on the overall
performance of the 2024-25 cohort of North Ayrshire Council school leavers
(copy enclosed).
6 Care Experienced School Leavers’ Attainment and Achievement
2024-25
Submit a report by the Executive Director (Education) on the overall
performance of the 2024-25 cohort of care experienced school leavers in
North Ayrshire (copy enclosed).
7 School Holiday Calendar – Academic Session 2027-28
Submit a report by the Executive Director (Education)  informing Cabinet of
changes to the school holiday calendar from academic session 2027-28 (copy
enclosed).
GENERAL BUSINESS FOR DECISION
Report by the Executive Director (Education)
8 Child Poverty Action Plan Progress Report 2025-26
Submit a report by the Executive Director (Education)  requesting approval of
the Child Poverty Action Plan Progress Report 2025-26 (copy enclosed).
Report by the Director (Health and Social Care Partnership)
9 Children’s Services Performance Report 2025/26
Submit a report by the Director (HSCP)  seeking approval for the North Ayrshire
Children’s Services Plan Performance Report 2025/26 (copy enclosed).
Reports by the Chief Executive
10 Revenue Budget 2025/26: Financial Performance to 31 March 2026
Submit a report by the Head of  Finance advising Cabinet of the financial
performance for the Council for 2025/26 (copyenclosed).
11 Capital Programme Performance to 31 March 2026
Submit a report by the Head of Finance advising Cabinet of progress in
delivering the Capital Investment Programme 2025/26 (copy  enclosed).
Reports by the Executive Director (Communities and Housing)
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
12 Community Asset Transfer – Blacklands Hall, Kilwinning
Submit a report by the Executive Director (Communities and Housing) 
seeking approval for the transfer of ownership of Blacklands Hall (and
adjacent land), Abbots Avenue, Kilwinning to the Kilwinning Community
Shed  (copy enclosed).
13 Community Asset Transfer – Auld Dirrans Resource Centre,
Kilwinning
Submit a report by the Executive Director (Communities and Housing) 
seeking approval for the transfer of ownership of Auld Dirrans Resource
Centre, 70 Dirrans Terrace, Kilwinning to Irvine Elite Boxing Club  (copy
enclosed).
14 Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Housing)  to
determine applications by Locality Partnerships to allocate CIF funding to
proposed projects (copy enclosed).
15 Use of Animals at Public Events
Submit a report by the Executive Director (Communities and Housing)
seeking Cabinet approval of Guidelines and Policy relating to the use of
animals at public events (copy enclosed).
16 North Ayrshire Housing Acquisition Strategy
Submit a report by the Executive Director (Communities and Housing)
seeking Cabinet approval of the proposed Housing Acquisition Strategy
2026-2031 (copy enclosed).
Reports by the Executive Director (Place)
17 Ardrossan Campus - Project Update
Submit a report by the Executive Director (Place) providing Cabinet with
an update on the current progress of the Ardrossan Campus project,
including current projections in relation to costs and programme (copy
enclosed).
18 Ayrshire Growth Deal: International Marine Science and Environment
Progress (IMSE) Update
Submit a report by the Executive Director (Place) on progress on the
International Marine Science and Environment project and seeking
approval for the strategic direction and to note the development of a
Collaboration Agreement with partners Field Studies Council and
Community of Arran Seabed Trust to support the further development of
the project (copy enclosed).
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
19 Flexible Advanced Manufacturing Space, i3 Irvine: Phase 2, Full
Business Case
Submit a report by the Executive Director (Place) seeking endorsement of
the Full Business Case for Phase 2 of the Flexible Advanced
Manufacturing Space Project at i3, Irvine (copy enclosed).
20 National Islands Plan and North Ayrshire Islands Programme Update
Submit a report by the Executive Director (Place) on the North Ayrshire
Islands Programme and the new National Islands Plan and outlining
proposed next steps (copy enclosed).
21 Regeneration Delivery Plan Funding Proposals Update 2026/27
Submit a report by the Executive Director (Place) on progress of the
Regeneration Delivery Plan and seeking approval for proposed funding
allocations in 2026/27(copy enclosed).
22 Fleet Decarbonisation
Submit a report by the Executive Director (Place) on progress made to
date with decarbonisation of the Council Fleet and providing details of the
further proposed decarbonisation-first approach work going forward (copy
enclosed).
23 Urgent Items
Any other items which the Chair considers to be urgent.
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home,where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact  dataprotectionofficer@north-ayrshire.gov.uk
5

Page 6

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet Sederunt
Elected Members
Tony Gurney (Chair)
Christina Larsen (Vice-Chair)
Eleanor Collier
Alan Hill
Margaret Johnson
Chloe Robertson
Church Representatives
Rev Dr David Hume
Ms Elizabeth Turbet
Vacancy
Teaching Representative
Ms Jacqui MacKenzie
Youth Council Representatives
Chair:
Apologies:
Attending:
6

Page 7

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Cabinet
28 April 2026 
IRVINE, 28 April 2026 - At a Meeting of the Cabinet of North Ayrshire Council at 
2.30 p.m. 
Present (Physical Participation)
Tony Gurney, Christina Larsen, Eleanor Collier, Alan Hill, Margaret Johnson and Chloé
Roblertson. 
In Attendance
C. Hatton, Chief Executive; R. McCutcheon, Executive Director, T. Reaney, Head of
Service (Neighbourhood Services) and L. Cree, Head of Service (Sustainability,
Transport and Corporate Property) (Place); D. Hammond, Executive Director, R. Leith,
Head of Service (Connected Communities) and A. Finlayson, Senior Manager
(Planning) (Communities and Housing); C. Cameron, Director (Health and Social Care
Partnership); S. Anson, Executive Director, Donna Martin, Strategy and Programme
Manager (Child Poverty) and S. Robbie. Business Manager (Education); M. Boyd, Head
of Service (Finance); F. Walker, Head of Service (People & ICT); A. Craig, Head of
Democratic Services, L. Jolly, Communications Officer (Media and Internal
Communications) and C. Stewart, Committee Services Officer (Democratic Services)
(Corporate Services). 
Chair
Tony Gurney in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Cabinet held on 17 March 2026 were confirmed and
the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973. 
3. Additional Bank Holiday – 15 June 2026 
Submitted a report by the Head of Democratic Services informing Cabinet of the decision
and recommendation of the Audit & Scrutiny Committee following a call-in of the Cabinet
decision of 17 March 2026 to approve the additional bank holiday for all employees on
Monday 15 June 2026. 
Following consideration, the Cabinet agreed to accept the recommendation of the
Audit & Scrutiny Committee and altered its original decision to the effect that the
additional bank holiday on 15th June 2026 should not be approved for Council staff. 
Agenda Item 2
7

Page 8

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
4. Child Poverty & Early Intervention Fund (CPEIF): Proposed Budget
Allocation of £276,000 for Child Poverty and Strengthened Governance
Arrangements 
Submitted a report by the Executive Director (Education) seeking approval for the
proposed allocation of the £276,000 child poverty budget into CPEIF and outlining
strengthened governance and monitoring arrangements for future applications and
approvals for use of the Fund. 
Officers responded to Members’ questions and the Cabinet agreed to approve the
proposals to allocate the £276,000 child poverty budget to CPEIF, enabling continuity
of the fund over 2026-27. 
5. Progress Update on Children’s Rights and Approval of North Ayrshire’s
Statutory UNCRC Progress Report (2024-2026) 
Submitted a report by the Executive Director (Education) providing an update on action
the Council is taking to progress children’s rights and seeking approval to publish the
first statutory Children’s Rights Progress Report (covering the period 2024–2026.),
attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Cabinet agreed to (a) note (i) the
good progress being made across Council services and partners to strengthen the
implementation of children’s rights and (ii) that future reporting would be aligned within
the new joint Children and Families Plan 2026-2029, covering Children’s Services,
Child Poverty and Children’s rights; and (b) approve the statutory Children’s Rights
Progress Report for 2024–2026 for publication. 
6. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Housing) on
applications by Locality Partnerships for the allocation of CIF funding to proposed
projects. Applications from the Micah Project and North Ayrshire Table Tennis Club
were attached at Appendices 1 to 2, respectively, to the report. 
Officers responded to Members’ questions and the Cabinet (a) reviewed the
applications from the Irvine Locality Partnership and Three Towns Locality Partnership
in line with CIF criteria; and (b) agreed to approve (i) the CIF application in relation to
the Micah Project (Appendix 1 to the report) and (ii) the CIF application in relation to
North Ayrshire Table Tennis Club (Appendix 2 to the report). 
7. Consultation Response: Accelerating Home Building 
Submitted a report by the Executive Director (Communities and Housing) seeking
Cabinet approval of the proposed response to the Scottish Government consultation on
accelerating home building. The proposed consultation response was attached at
Appendix 1 to the report. 
The Cabinet agreed to approve the proposed consultation response at Appendix 1 to
the report.
8

Page 9

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
8. Roads Structures & Streetlighting Maintenance Programme 2026/27 
Submitted a report by the Executive Director (Place) seeking Cabinet approval of the
proposed Roads, Structures and Street Lighting Maintenance Programme for 2026/27,
attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Cabinet agreed to (a) note (i) the
approach taken to determining the asset maintenance programme for roads, structures 
and street lighting and (ii) that the programme would be issued to the Locality Planning
Partnerships for information; and (b) approve the maintenance programme for
2026/27, as shown at Appendix 1 to the report. 
9. Urgent Items 
There were no urgent items. 
10. Exclusion of the Press and the Public 
Cabinet resolved in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following items of
business on the grounds indicated in terms of Paragraph 9 of Part 1 of Schedule 7A of
the Act. 
11. Exempt Report: Lease Amendment – Lower Ground Floor, Lochshore Hub,
Glengarnock 
Submitted a report by the Executive Director (Place) on the above. 
The Cabinet agreed to approve the recommendation as detailed in the report. 
12. Exempt Report: Lease to a Nominated Party: Leading Light Navigation
Tower Site, Ardrossan 
Submitted a report by the Executive Director (Place) on the above. 
The Cabinet agreed to approve the recommendation as detailed in the report. 
13. Exempt Report: Disposal to a Nominated Party: Land at 23 Ayr Road, Irvine 
Submitted a report by the Executive Director (Place) on the above. 
The Cabinet agreed to approve the recommendation as detailed in the report. 
14. Exempt Report: Sale Disposal – Abbey Park Football Ground, Bankhead
Road, Kilwinning and 26 Dovecot Lane, Kilwinning 
Submitted a report by the Executive Director (Place) on the above. 
9

Page 10

OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Cabinet agreed to approve the recommendation as detailed in the report. 
The meeting ended at 3.15 p.m.
10

Page 11

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    Planned temporary closure of educational provisions 
Purpose:  To outline a standardised procedure in connection with the
planned temporary closure of educational provisions, compliant
with updated Scottish Government Guidance 
Recommendation:  That Cabinet: 
a) Notes the decisions taken, which resulted in the temporary
closure of two early years’ classes for session 2026-27;
b) Approves the adoption of the proposed policy for future
temporary closures, in line with updated Scottish Government
Guidance and;
c) Agrees to the submission of an annual report to Cabinet
summarising any proposed temporary closures for future
sessions. 
1. Executive Summary 
1.1 This report outlines a new proposed policy for managing temporary closures of
educational provisions, following the publication of updated guidance from Scottish
Government. The proposed policy for North Ayrshire Council is submitted for approval
for implementation from 2027. 
1.2 This report also advises on two remote rural early years’ classes that have been subject
to planned temporary closure in session 2025-26 and will remain temporarily closed in
2026-27 for lack of registered children for that academic session. 
2. Background 
2.1 On 19 December 2025, the Scottish Government wrote to Directors of Education with
information on an update to the sections of the Schools (Consultation) (Scotland) Act
2010 Guidance that cover planned Temporary Closures (previously referred to as
“mothballing”). This work was the culmination of a collaborative process involving
Scottish Government and a number of Local Authorities throughout 2025. 
2.2 A temporary closure is a time-limited cessation of operation of a school, early years
class or stage of education where a local authority has evidence that the provision could
reasonably re-open in the future. 
Agenda Item 3
11

Page 12

2.3 Whilst there are no primary or secondary establishments in North Ayrshire which have
been temporarily closed under the new guidance, at early years registration for 2025,
there were no families requiring a place at Corrie PS Early Years Class.  There was one
approach in May 2025 in respect of Pirnmill PS Early Years Class, however, the family
decided to register elsewhere due to there being no other children registered.  Both
provisions were, therefore, temporarily closed for session 2025-26 due to there being
no children registered. 
2.4 Registration for early years places for the forthcoming academic session (2026-27)
opened from 4 February to 1 March 2026.  Again, no parent/carers registered their child
for either Corrie or Pirnmill Early Years’ classes, despite these choices being available
for selection on the online form. A decision was therefore taken to extend the temporary
closure of both of these provisions for session 2026-27, pending further review at the
same time next year. 
2.5 In order to implement the new guidance systematically going forward, a new policy is
proposed for implementation from 2027 and is attached at Appendix 1.  The main aim
of the policy is to ensure lawful, transparent, proportionate decisions are made that do
not undermine statutory requirements for permanent school closures under the Schools
(Consultation) (Scotland) Act 2010.   
2.5 The policy provides guidance on the processes to be followed by officers when
considering or implementing temporary closures of educational provision.  It applies to
all North Ayrshire early years’ provisions, primary and secondary schools, covering all
individual stages of education, including Gaelic provision. 
2.6 The policy aims to ensure that: 
• The educational benefit of children and young people is central to decision making
• Decisions are evidence-based, transparent and accountable
• Communities and parent/carers are engaged fairly and openly
• Temporary closure is not used to undermine the intent of the Schools (Consultation)
(Scotland) Act 2010 
2.7 Temporary closures are exceptional measures and must only be used where there is a
realistic prospect of reopening. The policy outlines the circumstances in which a
temporary closure may be considered. 
2.8 Before a decision to temporarily close a provision is considered, an analysis of the
educational merits of such a decision must be carried out. 
2.9 A proposed timeline for the annual consideration and review of temporary closures from
2027 onwards is included within the policy.   
2.10 Under the policy, an annual report outlining any proposed temporary closures will be
prepared for consideration by Cabinet. 
3. Proposals 
3.1 It is proposed that Cabinet: 
12

Page 13

a) Notes the decisions taken, which resulted in the temporary closure of two Early Years
classes for session 2026-27; 
b) Approves the adoption of the proposed policy for future temporary closures, in line
with updated Scottish Government Guidance; 
c) Agrees to the submission of an annual report to Cabinet summarising any proposed
temporary closures for future years. 
4. Implications/Socio-economic Duty 
Financial 
4.1  None. 
Human Resources 
4.2 In circumstances where planned closure is expected to be temporary, staff are likely to
be redeployed elsewhere within the education service. 
Legal 
4.3 The proposed policy is informed by the Schools (Consultation) (Scotland) Act 2010 and
its supporting Scottish Government guidance.  Schedule 1 of the Schools (Consultation)
(Scotland) Act 2010 provides that any arrangement likely to result in the permanent
discontinuation of a school, early years’ provision or stage of education constitutes a
closure proposal and must follow the statutory consultation process.  
Equality/Socio-economic 
4.4 Equality and Children’s Rights Impact Assessments would be required in certain future
circumstances e.g. where there is still demand, but numbers are very low. 
Climate Change and Carbon
4.5 None.
Key Priorities 
4.6 Improving outcomes for children, young people and families 
Ensuring fair access to education and services 
Efficient and sustainable service delivery 
Community Wealth Building 
4.7 None. 
13

Page 14

Islands Communities Impact Assessment (ICIA) 
4.8 The revised guidance clearly recognises that the impact of temporary closures can be
more pronounced in island locations. As such, where a temporary closure is proposed
but registrations/pupil numbers are very low, a full impact assessment, including
Equality Impact Assessment and Children’s Rights Impact Assessment would be
undertaken as per the guidance, with particular consideration given to island matters.. 
United Nations Rights of the Child (UNCRC) 
4.9 The following Rights are positively impacted by the proposals: 
• Education/ Goals of Education (Articles 28/29) 
• Best Interests of the Child (Article 3) 
• Non-Discrimination and Equality (Article 2) 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Consultation has taken place with the Head Teacher of the 2 affected Early Years
classes and with Legal Services. 
Andrew McClelland 
Chief Education Officer, Head of Service (Education) 
For further information please contact Robin Knox, Education Infrastructure Manager ,
on 01294 324487. 
Background Papers
None
14

Page 15

Education Service
Policy 
Planned Temporary Closure
of Educational Provisions 
Date: May 2026
APPENDIX 1
15

Page 16

1 
Contents
1. Introduction ............................................................................................................... 2
2. Considerations .......................................................................................................... 2
3. Process ...................................................................................................................... 3
4. Review and Monitoring ............................................................................................. 3
5. Legislation ................................................................................................................. 4 
16

Page 17

2 
1. Introduction
1.1 A temporary closure is a time-limited cessation of operation of a school, early years’
provision or stage of education where the Council has evidence that the provision
could reasonably reopen in the future. Temporary closure must not: 
 be used to avoid statutory consultation
 have the effect, or likely effect, of permanent closure 
1.2 This policy sets out the agreed North Ayrshire Council procedure and operational
requirements for the planned temporary closure of schools, stages of education and
early years provisions. It ensures that decisions are lawful, transparent, proportionate
and do not undermine statutory requirements for permanent closures under the
Schools (Consultation) (Scotland) Act 2010. Temporary closures (formerly referred to
as ‘mothballing’) are exceptional measures and must only be used where there is a
realistic prospect of reopening. 
1.3 This policy provides guidance on the processes that must be followed by officers
when considering or implementing temporary closures. It applies to all: 
 North Ayrshire Council primary and secondary schools
 Stages of education within schools (including Gaelic or English medium
provision)
 Early years’ settings including classes attached to schools 
2. Considerations 
2.1 Temporary closure may only be considered in very restricted circumstances,
including: 
 A zero-roll position, where no children are attending or registered, and there is a
realistic prospect of families returning, particularly in remote or island
communities
 Very low pupil numbers, where wider factors have been assessed alongside
educational benefits
 Where the parent council formally requests consideration of a temporary closure
 Where a school and its attached nursery are both affected and it is appropriate to
temporarily close the whole setting together 
2.2 Temporary closure must only proceed where analysis demonstrates that there is a
potential for short/medium term reopening, supported by future roll projections or
early learning and childcare demand evidence. 
2.3 In non-remote areas, temporary closures should not normally exceed 3 years. 
2.4 For rural schools, officers must explicitly consider whether temporary closure
represents a reasonable alternative under section 12A of the Schools (Consultation)
(Scotland) Act 2010. 
2.5 Educational benefit must always be the central focus. Additional core factors to
assess include: 
17

Page 18

3 
 Sustained decline in rolls or attendance patterns.
 Sustainability of staffing, resources, and running costs.
 Risk of building deterioration during closure and mitigation required.
 Distance, transport implications and impacts on attendance.
 Effect on community use of facilities and wider community resilience.
 Impact on learners, particularly those undertaking qualifications.
 Statutory early learning and childcare requirements under the Children and
Young People (Scotland) Act 2014 
3. Process 
3.1 The timeline at Appendix 1 to this document provides the dates to be followed under
this process.  This aligns the process by which parent/carers are informed about both
their early years’ placement and the outcome of any placing request application for
school aged children and young people.
3.2 Meaningful engagement with the following groups is expected before any formal
decision is made: 
 Parents/carers and children/young people.
 Relevant staff groups.
 Local elected members and parliamentary representatives where appropriate. 
3.3 Engagement should begin as early as possible when viability concerns emerge
(typically within the next academic year).
3.4 The Education Service will provide a clear rationale and indicative timelines for any
potential temporary closure.
3.5 Prior to making a recommendation to Cabinet to temporary close an educational
provision, officers must: 
(i) Prepare an options appraisal identifying reasonable alternatives
(ii) Assess whether the proposal could reasonably be regarded as a permanent closure
(iii) Consider educational benefits, community impact and future viability
(iv) Confirm compliance with legislation (noted at section 4 below) 
3.6 Temporary closure must not be used to avoid statutory consultation. Where the
majority of parent/carers oppose temporary closure, the Council should move to a
statutory consultation on permanent closure as soon as practicable. Where a
statutory consultation is ongoing, and where feasible, the provision should remain
operational for any remaining children. 
4. Review and Monitoring
4.1 All temporarily closed provisions must be formally reviewed annually. Reviews must
consider updated roll projections, community circumstances and viability of
reopening.
4.2 Review outcomes must be recorded and reported to Cabinet each year. 
18

Page 19

4 
5. Legislation
5.1 The proposed policy is informed by the Schools (Consultation) (Scotland) Act 2010
and its supporting Scottish Government guidance.  Schedule 1 of the Schools
(Consultation) (Scotland) Act 2010 provides that any arrangement likely to result in
the permanent discontinuation of a school, early years’ provision or stage of
education constitutes a closure proposal and must follow the statutory consultation
process.
19

Page 20

5 
Appendix 1 – Annual Timeline 
Dates Action/Method
Second week in
November
P1 Registration for parent/carers for the following school session
January each year Early years’ registration opens for parent/carers of children
turning aged 3 on or after 1 March
End of January Early years’ registration closes and allocation of places begins
February each year At this point, any early years’ provision with one or fewer children
registered will be known, however, late registrations can be
expected up to May each year.
Prepare Cabinet report with recommendations on those
provisions to become/remain temporarily closed.
15 March each year Placing request application deadline, legislated within Section
28A of the Education (Scotland) Act 1980.
By 30 April each year Education to inform parent/carers of early years’ place and
outcome of placing request application at the same time. 
20

Page 21

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    Review of ELC Sustainable Rates for Funded Providers 
Purpose:  To seek approval from Cabinet to increase the sustainable rate
of payment to funded providers of early learning and childcare
(ELC) in North Ayrshire who are contracted by the Council to
deliver funded ELC to eligible 2–5-year-olds. 
Recommendation:  It is recommended that Cabinet:
a) Agrees an increase of 6.2% in the current hourly rate paid by
the Council to funded providers, backdated to 1 April 2026.
b) Agrees to an increase to all funded providers (including
childminders) in the amount paid per meal to £3.22, and for
this to be backdated to 1 April 2026.
c) Agrees to receive a further report at the time of the next
annual review of the sustainable rate for funded providers.   
1. Executive Summary 
1.1 Cabinet approved in June 2025 an increase in the hourly rate paid to funded providers
in the financial year 2025-26. This increased the rate from £6.51 for eligible 3–5-year-
olds and £6.81 for eligible 2-year-olds to £6.77 and £7.08 respectively and included a
commitment to enable funded providers to pay at least the Real Living Wage of £12.60
per hour in 2025-26. 
1.2 The Real Living Wage for 2026 has been set at £13.45. National Guidance requires
local authorities to uplift sustainable rates by a minimum of 5.2%. It is proposed that
North Ayrshire Council applies a slightly greater uplift of 6.2% to the sustainable rate,
in recognition of the above and the variations in cost circumstances across our partner
funded providers. This will lead to rates of £7.19 per hour for 3-5-year-olds and £7.52
for eligible 2-year-olds. 
1.3 North Ayrshire Council will receive an additional £317k from Scottish Government to
fund this uplift. 
1.4 In addition to the hourly rate, it is proposed that the payments for meal costs are also
increased. Taking account of food inflation and to consolidate payments for meals into
a single figure across all providers in North Ayrshire, it is proposed that payments per
meal should increase by 4.2% from £3.09 to £3.22 and that this rate should apply to
all funded providers, including childminders. 
1.5 It is proposed that all rate increases be backdated to 1 April 2026.
Agenda Item 4
21

Page 22

2. Background 
2.1   Since August 2021, all 3 and 4-year-old children and eligible 2-year-old children have
been entitled to 1140 hours of funded early learning and childcare per annum. To deliver
this across Scotland, Councils work with both Council-run services and local partner
providers in the private and not-for-profit sectors, including childminders, to ensure there
is sufficient capacity to deliver 1140 hours to all eligible families in their local areas. In
addition to the 44 council establishments, North Ayrshire Council currently contracts
with 16 funded provider nurseries and 51 childminders to deliver ELC entitlement to
families across the authority. Funded providers enter a contract with North Ayrshire
Council which requires them to meet the National Standard for Early Learning and
Childcare Providers and in return NAC pay an hourly sustainable rate for up to a
maximum of 1140 hours per annum for each child in their care. 
2.2 In February 2026, Scottish Government published updated Funded early learning and
childcare 2026-2027: guidance for setting sustainable rates which outlines key
principles for setting sustainable rates. In addition to the key principles, the document
sets out the characteristics of a sustainable rate, which include: 
• The rate will support delivery of a high quality ELC experience for all children.
• It will be a rate that reflects the cost of delivery, including the delivery of national
policy objectives.
• The rate will allow for investment in the setting – staff, resources and physical
environment; and
• It will enable payment of the real Living Wage for those childcare workers delivering
the funded entitlement. 
2.3 The guidance also highlights that, from a local authority perspective, the following points
should also be considered: 
• The rate should not have a detrimental effect on the local authority’s ability to
continue to pay for the service in the long-term.
• The wider package of ‘in-kind benefits,’ which are separate to the sustainable rate,
available to the funded provider as part of their contract with the local authority; and 
• The rate does not need to be cross subsidised by parents and carers through
charges for non-funded hours. 
2.4 Cabinet approved an increase in the sustainable rate in June 2025. An increase was
agreed for the financial year 2025-26 from £6.51 per hour to £6.77 per hour for all
eligible 3–5-year-olds. Similarly, the rate for eligible 2-year-olds was increased from
£6.81 per hour to £7.08 per hour. The increased rates in North Ayrshire represented an
overall uplift in 2025-26 of 4% for 3-5-year-olds and 4% for eligible 2-year-olds
compared to the 2024-25 rate. On a national level, the average reported rate across
local authorities for 3-5 year olds was £6.87 per hour and for eligible 2 year olds the
average rate was £7.26 per hour. 
2.5 National guidance for the setting of sustainable rates in 2025-26 contains a commitment
that will enable funded providers to pay at least the new Real Living Wage rate of £13.45
per hour from April 2026. Local authorities are asked to apply a minimum uplift of 5.2%
to 2025-26 sustainable rates to enable this to be achieved. North Ayrshire Council will
receive additional funding of £317k in 2026-27 from Scottish Government to support
this.
22

Page 23

2.6 In line with national guidance, North Ayrshire Council has applied an assumption that
staff costs account for, on average, 77% of total costs. The change in the Real Living
Wage in 2026 from £12.60 to £13.45 represents a 6.7% increase. Uprating the total staff
cost element (77%) of the sustainable rate by 6.7% would result in an increase in the
overall rate of 5.52%. 
2.6 Following review, it is proposed that an uplift of 6.2% be applied to the sustainable rate
in North Ayrshire for financial year 2026-27, going beyond the minimum required
increase. This recognises individual variations in cost circumstances across our local
partners and continues our commitment to ensuring that funded providers are able to
pay a minimum of the Real Living Wage to their employees. Based on our current
projections, the funding received from Scottish Government will be sufficient to cover
this increase. The proposed rates for 2026-27 are set out in the table below: 
2025-26
(until March 2026)
2026-27
(from April 2026)
Uplift rate (%)
3-5-year-olds £6.81 £7.19 6.2%
Eligible 2-year-olds £7.08 £7.52 6.2% 
2.7 In addition to the hourly rate paid to providers, funded providers receive an additional
payment per meal (or the provision of a meal through the North Ayrshire Council School
Meals Service). In 2025-26, funded providers and childminders received £3.09 per
meal. In addition to this, all registered childcare providers have access to funding
through the Scottish Milk and Healthy Snack Scheme to provide milk and a portion of
fruit or vegetables for every child each day at the current national rate of 58.2p per day. 
2.8 Taking account of food inflation, it is proposed that payments per meal should increase
by 4.2% from £3.09 to £3.22 from 1 April 2026 onwards. The existing option to have
meals provided by North Ayrshire Council Facilities Management Team will continue to
apply as at present to funded providers (excluding childminders). The proposed rates
are set out in the table below: 
Payments per meal 2025-26
(until March 2026)
2026-27
(from April 2026)
Uplift rate (%)
Funded providers
(nursery settings)
£3.09 £3.22 4.2%
Childminders £3.09 £3.22 4.2% 
2.9  In addition to the sustainable rate, North Ayrshire Council provides a range of non-
financial benefits and supports to funded providers, including professional
learning/training, targeted support, quality improvement support visits, advice from our
Early Years team, pre- and post-inspection support and workforce support. 
2.10 North Ayrshire Council has recently reviewed, refreshed and confirmed all contracts for
funded providers and childminders. These reviews have included consideration of
funding requirements. Delivery on the commitment for funded providers to pay at least
the Real Living Wage is included as part of North Ayrshire Council’s ongoing
engagement and contract monitoring processes with funded providers.   
2.11 It is proposed that the proposed increase in rates be backdated to 1 April 2026. 
23

Page 24

3. Proposals 
3.1   It is recommended Cabinet:
a) Agrees an increase of 6.2% in the current hourly rate paid by the Council to funded
providers from 1 April 2026.
b) Agrees to an increase to all funded providers (including childminders) in the amount
paid per meal to £3.22, and for this to be backdated to 1 April 2026.
c) Agrees to receive a further report at the time of the next annual review of the
sustainable rate for funded providers. 
4. Implications/Socio-economic Duty 
Financial 
4.1 North Ayrshire Council will receive £317k as part of the £11m allocated by Scottish
Government to add a minimum of 5.2% uplift to 2025-26 sustainable rates. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 In supporting a sustainable ELC provision within the private, not for profit and
childminding sectors, we aim to reduce any inequalities of provision and quality of ELC
services. We aim to ensure all children experience the best start in life, and families are
supported into work, thus reducing poverty. 
Climate Change and Carbon 
4.5 Ensuring sustainable access to ELC provision within the private, voluntary and
independent sector ensures that parents / carers are able to access a range of ELC
services within their local community. Consequently, this encourages the use of active
travel to access provision and will encourage reduction in greenhouse gas emissions in
North Ayrshire. 
Key Priorities 
4.6 Proposals outlined in this report support the Council Plan 2023-28 strategic aim to
“transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for
local people” and more specifically “improving educational attainment and achievement
and closing the attainment gap” activities. 
24

Page 25

Community Wealth Building 
4.7   The proposals support the following pillars of community wealth building: 
• Advancing community enterprises
• Supporting local business activities and increasing the variety of ownership models. 
5. Consultation 
5.1 North Ayrshire Council’s ELC leadership team meet regularly with funded providers,
including private and partner nurseries as well as childminders, and have considered
views expressed in relation to the need for enhanced rates in light of the current financial
challenges faced by funded providers associated with the cost of living. 
Andrew McClelland
Chief Education Officer, Head of Service (Education) 
For further information please contact Andrew McClelland, Head of Service (Education),
on (01294) 324413. 
Background Papers
None
25

Page 26

26

Page 27

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    School Leavers’ Attainment and Achievement 2025 
Purpose:  To update Cabinet on the overall performance of the 2024-25
cohort of North Ayrshire Council school leavers. 
Recommendation:  It is recommended that Cabinet:
a) Notes the content of the report, including the achievements
of school leavers in qualifications in 2025; and
b) Notes the measures being taken to make further
improvements to attainment and achievement levels across
NAC Secondary schools. 
1. Executive Summary 
1.1 In 2025, NAC had a strong overall performance in literacy and numeracy attainment, with
92% of school leavers achieving Level 4 in both measures. Performance in literacy at
Level 5 remains a strength, while Level 5 numeracy has dipped slightly in the most recent
year, leading to focused improvement work across schools. 
1.2 The average total tariff score rose to 864, showing renewed improvement in overall
attainment. North Ayrshire school leavers are outperforming the national figures across
a range of SIMD deciles. Outcomes for leavers in the most deprived communities remain
a relative strength, with strong performance across several deprivation measures. The
priority is to sustain this progress while improving attainment across all deciles. 
1.3 Across a range of measures of breadth and depth, North Ayrshire leavers continue to
perform well when benchmarked against the virtual comparator, Quad partner authorities
and the national cohort. Particular highlights include the percentage of learners who left
with at least five qualifications at level 3 or better, and the percentage who left with at
least five level 6 qualifications or better. 
1.4 Positive destinations remain very strong at 95.7%, above the virtual comparator and in
line with national performance. Maintaining this strength, especially for the most deprived
learners, remains an important priority for the service and one which will be supported
by the integration of the Employability Service into the Education Directorate. 
1.5 Targeted and universal improvement actions in 2024-25 focused on high-quality
pedagogy, data led improvement, equity, and partnership working. For 2025-26 and
beyond, priorities include stronger use of data, improved tracking and monitoring,
enhanced curriculum pathways using the SCQF, and a sharper focus on breadth, depth,
Agenda Item 5
27

Page 28

and consistency of attainment, underpinned by the Education Service’s updated three-
year Improvement Plan. 
2. Background 
2.1 The performance information in this paper is collated from three key sources: 
• The Local Government Benchmarking Framework (LGBF) which lists a range of
performance indicators for all 32 local authorities across Scotland, allowing
performance to be considered relative to others. 
• The ScotXed INSIGHT Benchmarking Tool, which is produced for schools and
education authorities to enable analysis and improvement planning across all key
national measures of attainment.
• The Scottish Government annual publication: Summary Statistics for Attainment
and Initial Leaver Destinations, No.8: 2026 edition   
2.2 Schools in North Ayrshire focus on the attainment for each learner by the end of the
Senior Phase (exit qualifications), rather than solely on the individual year on year
attainment pattern. The attainment of each learner across their Senior Phase is more
important than what they achieve in a single year (except for S4 leavers). 
2.3 The attainment data in this paper relates to the attainment of school leavers who left
school in session 2024-25, which includes leavers up to Christmas 2025. This is the
most up to date school leaver attainment and reflects what was published in
February/March 2026 in the sources named above. 
2.4 The number of school leavers in academic session 2024-25 was 1396. This is the
second lowest number of school leavers in the last 5 years. The percentage of S4
leavers has decreased from 2024 whilst the percentage of S5 and S6 leavers are
broadly in line with the last 3 years. 
Leavers by stage
Year S4 S5 S6 All leavers
2020-21 128 (9.3%) 383 (27.9%) 862 (62.8%) 1373
2021-22 172 (11.3%) 469 (30.9%) 879 (57.8%) 1520
2022-23 216 (14.7%) 438 (29.8%) 814 (55.4%) 1468
2023-24 212 (13.6%) 488 (31.3%) 859 (55.1%) 1559
2024-25 182 (13.0%) 435 (31.2%) 779 (55.8%) 1396 
2.5 This paper will consider the performance of North Ayrshire schools as a group,
identifying trends and key highlights or areas for improvement in the following
measures of attainment:
• School leaver attainment in literacy and numeracy
• The average total tariff scores of school leavers
• School leaver attainment levels in the context of deprivation
• The breadth and depth of qualifications attained by school leavers
• School leaver initial positive destinations 
2.6 Throughout this report, the attainment of North Ayrshire school leavers is
benchmarked against the following comparators:
• Previous NAC performance
• Performance of the virtual comparator
• Performance of other local authorities
28

Page 29

• Performance at national level 
2.7 To support understanding of technical terminology, a glossary of key terms used
throughout this report is included at Appendix 1.  
2.8 Improving attainment in Literacy and Numeracy 
All Leavers Achieving Literacy
North Ayrshire leavers continue to perform well in literacy. At both level 4 and level 5
literacy, the NAC performance has been consistently above the virtual comparator and
above or broadly aligned to the national performance since 2019. In 2025, 92% of
leavers achieved at least level 4 literacy, and 81% achieved at least level 5 literacy.
Targets have been set to increase both of these figures for next session.   
All Leavers Achieving Numeracy
In six out of the last seven years, North Ayrshire leavers have outperformed the virtual
comparator in level 4 numeracy. With the exception of 2021, NAC performance has
been broadly the same as the national figure over the same period. Indeed, in 2025 the
NAC performance (92%) was higher than both the national and virtual comparators. The
performance of North Ayrshire’s leavers in level 5 numeracy has historically tracked
above the virtual comparator and in line with national figures. However, there has been
a slight decline in attainment in 2025 for this measure to 69%. Targets have been set to
improve this performance for next session. 
29

Page 30

2.9 Improving attainment for all 
This measure focuses on the average total tariff score of the candidate’s latest and
best qualifications, and is one of our Council Plan Performance Indicators. Tariff points
are assigned to each unit or course achieved by learners – in all SCQF-graded awards,
not just those provided by SQA (now Qualifications Scotland). This acknowledges to a
greater extent the drive towards wider achievement qualifications and encourages
schools to offer curricular choices and learner pathways tailored to a variety of abilities
and aspirations. The data source for this measure is the ScotXed Insight benchmarking
tool. 
Various alternative certification models (ACMs) were in place for 2020 until 2023. The
“hump” in performance was anticipated. Exam arrangements returned to “normal” for
2024, which is the first year which can be reliably compared with the pre-pandemic
781
856
908 899
847 841
864
750
800
850
900
950
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
Average Total Tariff Score -ALL LEAVERS
NAC Average Total Tariff Score - ALL LEAVERS
30

Page 31

performance in 2019, the last time when “normal” exam arrangements were in place. In
2025, the overall average total tariff score for all leavers has begun to rise again, up to
864 (the highest level over this period outside of the ACMs).
Average Total Tariff Score of leavers according to attainment group
It is common practice to look below the headline average total tariff figure to see the
performance of three groups of school leavers: the lowest attaining 20%, the middle
attaining 60% and the highest attaining 20%. The table below shows the performance
of these groups over the last 5 years for which data is available.
School Leavers Average total tariff points in North Ayrshire 
(compared to Virtual Comparator and Scotland / data source = ScotXed Insight): 
2010-21 2021-22 2022-23 2023-24 2024-25 
NAC  VC Scot NAC VC Scot NAC VC Scot NAC VC Scot NAC VC Scot
Lowest
20% 160 157 164 155 140 154 133 127 141 123 100 129 115 108 132
Middle
60% 840 873 939 812 804 871 744 766 832 738 749 841 779 800 874
Highest
20% 1860 1910 1982 1907 1876 1950 1869 1866 1931 1865 1840 1928 1866 1892 1965 
In 2025, the average total tariff score for the lowest attaining 20% of learners is above
the Virtual Comparator and slightly below the national figure. The average total tariff
score of the middle attaining 60% of leavers is slightly lower than the virtual comparator
and the national figure, but 41 points higher than the previous year.  The average total
tariff score of the highest attaining 20% of leavers is also below both the virtual
comparator and the national figure, and very slightly (one point) higher than the previous
year. 
2.10 Attainment versus Deprivation: average total tariff score of leavers according to
SIMD decile 
There is a strong focus both nationally and locally on trying to reduce the poverty-related
attainment gap. The graph below displays the average total tariff score of leavers in
2025, depending on the SIMD decile of their postcode. The larger the circle, the larger
the size of the group of leavers. The North Ayrshire leavers cohort is in green and the
national cohort is in blue. While the distribution of leavers across all ten SIMD deciles
is relatively even across Scotland, the size of the leavers groups in North Ayrshire is
much larger at the lower end of the SIMD graph. Indeed, 43% (560) of our school
leavers in 2025 lived in SIMD deciles 1 and 2. In contrast, only 11% of North Ayrshire’s
leavers in 2025 lived in SIMD deciles 9 and 10 (this equates to 153 learners). 
North Ayrshire school leavers are outperforming the national figures across a range of
SIMD deciles. Across deciles 1-6, the average total tariff score in North Ayrshire was
almost entirely in line with or above the national figure, in some cases by a statistically
significant margin (e.g. SIMD decile 6). In contrast, at SIMD decile 10, the North
Ayrshire performance was well below the national figure. It should be noted that the
NAC figure is based on only 14 individuals and represents 1% of the leavers cohort,
compared to 9% nationally. Improving attainment across all deciles remains a priority
31

Page 32

for the service, alongside the other priorities in the new Education Service Improvement
Plan. 
2.11 Breadth and Depth of qualifications attained 
Breadth and depth measures show the percentage of leavers who left with a minimum
number of qualifications at a particular level. To aid further comparative analysis, we
have included figures from our Quad partners (Dundee City, Glasgow City and North
Lanarkshire). Quads are an ADES construct intended to improve performance across
all local authorities, and are formed by creating partnerships based upon shared
characteristics. The figures in the tables below show the collated attainment levels of
the Quad members except North Ayrshire. 
5 or more at Level 3     
2021 2022 2023 2024 2025
National 91% 90% 89% 88% 89%
North Ayrshire 91% 91% 89% 90% 89%
Virtual Comparator 91% 89% 88% 86% 87%
Quad Partners 89% 88% 87% 87% 87% 
Over the last five years, the proportion of North Ayrshire school leavers who left with
five or more qualifications at level 3 or better has been in line with or higher than the
national figure every year. Similarly, North Ayrshire leavers performed better than the
virtual comparator and leavers from our three other Quad partner authorities at this
level. 
32

Page 33

5 or more at Level 4     
2021 2022 2023 2024 2025
National 87% 87% 85% 84% 84%
North Ayrshire 86% 87% 83% 83% 81%
Virtual Comparator 87% 85% 84% 81% 82%
Quad Partners 85% 84% 83% 82% 83% 
Performance at Level 4 is more mixed. While the percentage of learners leaving with at
least five level 4 qualifications has declined slightly both nationally and locally, the North
Ayrshire performance has dipped below the virtual comparator and our Quad partner
authorities in 2025. This is a clear area for improvement which will be addressed
through the service improvement plan programme of targeted work on raising
attainment. 
1 or more at Level 5     
2021 2022 2023 2024 2025
National 89% 89% 88% 87% 88%
North Ayrshire 90% 89% 88% 87% 87%
Virtual Comparator 89% 88% 88% 84% 86%
Quad Partners 87% 86% 86% 85% 86% 
The percentage of school leavers who achieve at least one level 5 qualification (e.g.
National 5 level) is a key national performance indicator. North Ayrshire has performed
well in this measure over the last five years, remaining broadly in line with the national
performance, and above the virtual comparator and Quad partner authorities. 
5 or more at Level 5     
2021 2022 2023 2024 2025
National 71% 68% 66% 67% 69%
North Ayrshire 70% 67% 63% 65% 64%
Virtual Comparator 69% 65% 63% 62% 66%
Quad Partners 64% 62% 61% 61% 65% 
This measure is included in the Local Government Benchmarking Framework (LGBF).
At 64% of leavers attaining at least five level 5 qualifications in 2025, North Ayrshire is
in 20th position out of all 32 local authorities, which is an increase on our long-term
average relative position of 22. The percentage of learners leaving school with at leave
five level 5 qualifications (e.g. National 5s) has fluctuated somewhat over the last five
years, both locally and nationally. As a result, a specific focus will be maintained on this
measure. Schools will be required to set specific targets to increase the proportion of
learners leaving with at least five National 5 qualifications. 
When filtered for deprivation (not displayed in table), 54% of North Ayrshire’s leavers
from the 20% most deprived areas by SIMD achieve at least five level 5 qualifications.
This is above the national figure of 53% and puts North Ayrshire in 11th position overall
relative to all local authorities in Scotland. 
33

Page 34

1 or more at Level 6     
2021 2022 2023 2024 2025
National 70% 67% 66% 66% 68%
North Ayrshire 71% 68% 66% 68% 69%
Virtual Comparator 69% 65% 66% 64% 66%
Quad Partners* 67% 63% 63% 63% 65% 
The percentage of school leavers who achieve at least one level 6 qualification (e.g.
Higher level) is a key national performance indicator. North Ayrshire has performed well
in this measure over the last five years, remaining in line with or above the national
performance, and above the virtual comparator and Quad partner authorities. 
5 or more at Level 6     
2021 2022 2023 2024 
National 42% 39% 38% 39% 41%
North Ayrshire 38% 36% 35% 36% 40%
Virtual Comparator 38% 35% 35% 34% 37%
Quad Partners* 37% 34% 34% 35% 37% 
This measure is included in the LGBF. At 40% of leavers attaining at least five level 6
qualifications in 2025, North Ayrshire is in 12th position out of all 32 local authorities,
against a long-term average relative position of 23. There has been a notable
improvement in North Ayrshire’s performance at level 6 (equivalent to Higher) in 2025.
Indeed, over the last five years, North Ayrshire leavers have performed better than the
virtual comparator and Quad partner authorities. 
When filtered for deprivation (not displayed in table), 29% of North Ayrshire’s leavers
from the 20% most deprived areas by SIMD achieve at least five level 6 qualifications.
This is significantly above the national figure of 24% and puts North Ayrshire in 4th
position relative to all local authorities in Scotland. 
1 or more at Level 7     
2021 2022 2023 2024 2025
National 28% 26% 25% 25% 26%
North Ayrshire 24% 25% 20% 22% 22%
Virtual Comparator 25% 23% 20% 21% 24%
Quad Partners 23% 21% 22% 22% 25% 
In 2025, 22% of learners in North Ayrshire left school with at least one level 7
qualification (equivalent to Advanced Higher). This is consistent with the previous year,
but a change from the previous comparative position, which had been generally in line
with or above the virtual comparator and Quad partner authorities. At 22%, North
Ayrshire’s performance in this measure is still significantly higher than the pre-pandemic
years, where the figure tended to be between 18-19% on average in the five years to
2019. Nevertheless, a specific focus will be maintained on this measure. Schools will
be required to set specific targets to increase the proportion of learners leaving with at
least one level 7 qualification.
34

Page 35

2.12 Increasing post-school participation 
In North Ayrshire in 2024-25, the percentage of all school leavers in a positive
destination is 95.7% which is very slightly above last year’s figure, continues to be
above the virtual comparator, and is in line with the national level. When filtered to the
most deprived 20% of young people, NAC performance has tracked above the VC and
national figures for the last 5 years. This is also one of our Council Plan Performance
Indicators, and we see the integration of the Employability Service into the Education
Directorate as a real opportunity to maintain and build on this strong performance.   
2.13 IMPROVEMENT ACTIONS 2024-25 
Across the Education Service and the 9 Secondary schools, a range of universal and
targeted approaches were put in place to support raising attainment for young people
in North Ayrshire. The focus on high quality pedagogical approaches leading to
improved attainment, as well as the use of data for improvement, were strategic
priorities across all schools. 
2.14  IMPROVEMENT ACTIONS 2025-26 
For those school pupils leaving in June 2026, Secondary schools and the Education
Service have focused on a range of activities and approaches. There has been an
increased focus this academic session on the use of data for improving outcomes for
all learners, the use of the Scottish Credit and Qualifications Framework (SCQF) to
support learners’ pathways and curriculum choices, quality improvement of Secondary
Support Resources and an authority-wide launch of improving pupil attendance. The
Education Service Improvement Plan for 2025-26 outlines the activity undertaken
across this academic session to support raising attainment in our Secondary schools.  
35

Page 36

2.15  IMPROVEMENT ACTIONS 2026-27 
The Education Service 3-year Improvement Plan draft priorities have been created
collaboratively with Head Teachers of all schools to ensure there is a strategic focus on
improving attainment and achievement for all learners and ensuring that learners
receive equitable support. For Secondary schools, there will an increased focus on
target-setting for breadth and depth and qualifications, the creation of more
collaborative and consistent approaches to tracking and monitoring, improving
pedagogical approaches and strengthening learner pathways and curriculum offers.
Improved monitoring of attainment and achievement at school and authority levels will
be a key feature in evaluating improvement priorities and will help to direct targeted
resource where required. 
3. Proposals 
3.1 It is recommended that Cabinet notes: 
(a) Notes the content of the report, including the achievements of school leavers in
qualifications in 2025; and
(b) Notes the measures being taken to make further improvements to attainment and
achievement levels across NAC Secondary schools. 
4. Implications/Socio-economic Duty 
Financial 
4.1  None. 
Human Resources 
4.2  None. 
Legal 
4.3  None. 
Equality/Socio-economic 
4.4  None. 
Climate Change and Carbon 
4.5  None. 
Key Priorities   
4.6  Council priorities: 
The focus of the Education Service is to align with the Council Plan 2023-28 strategic aim
to ‘transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for
local people’ and more specifically ‘improving educational attainment and achievement and
closing the attainment gap’ activities. 
36

Page 37

Community Wealth Building 
4.7  None. 
Islands Communities Impact Assessment (ICIA) 
4.8  None. 
United Nations Rights of the Child (UNCRC) 
4.9  The focus on improving attainment outcomes for all young people demonstrates our
commitment to Children’s Rights and our continued work to ensure children’s rights are being
met. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Education Quality Improvement Team has worked closely with Head Teachers to
analyse, interpret and agree next steps towards further improvements in attainment and
achievement. That work has formed the basis of this paper. 
Andrew McClelland
Chief Education Officer, Head of Service (Education) 
For further information please contact Kathleen McCormick, Executive Manager
(Education), on 01294 324418. 
Background Papers
0
37

Page 38

APPENDIX 1 
GLOSSARY OF KEY TERMS USED IN THIS REPORT 
Virtual Comparator: 
Virtual comparator (VC) data is constructed from the performance of individual pupils with
similar characteristics from schools in other local authorities. For every pupil in a North
Ayrshire school, 10 similar pupils are identified from across all schools in other local
authorities to be part of the virtual comparator’s data. This allows a comparison based on
some key pupil characteristics (gender, deprivation (SIMD decile), additional support needs
and stage of leaving) that are linked to educational outcomes.  
Average Total Tariff Score: 
Each qualification carries a number of tariff points, depending on the level and complexity of
award. The system counts the best tariff score the candidate achieves in each qualification
(the points are not counted for the same subject twice, so for example, if a candidate achieves
National 5 English one year and goes on to achieve Higher English in a subsequent year,
only the points for the Higher are counted). The average total tariff score is arrived at by
adding the tariff scores of all school leavers and dividing by the number of leavers that year.  
SIMD decile: 
Each datazone (made up of a broadly equal number of households, by postcode) across
Scotland has been allocated a rank position through the Scottish Index of Multiple
Deprivation. The ranks are determined by a range of factors including income, employment,
health, education, housing, access to services etc. SIMD is the most commonly used proxy
for deprivation across Scotland. The datazones are divided into ten groups by rank. These
ten groups are called SIMD deciles. Decile 1 is the most deprived and decile 10 is the least
deprived.  
SCQF levels: 
The Scottish Credit and Qualifications Framework (SCQF) is the national framework for
categorising all qualifications. The SCQF ranges from Level 1 to Level 12 based on the level
of difficulty and complexity of the learning. Levels 1-3 are the most basic levels. Levels 4 and
5 are the equivalent of National 4 and National 5 qualifications. Level 6 is the equivalent to
Higher and Level 7 is the equivalent to Advanced Higher. The remaining levels are for further
and higher education qualifications, with Level 12 being doctorate level. 
38

Page 39

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    Care Experienced School Leavers’ Attainment and
Achievement 2024-25 
Purpose:  To update Cabinet on the overall performance of the 2024-25
cohort of care experienced school leavers in North Ayrshire. 
Recommendation:  That Cabinet:
a) Notes the content of the report, including the achievements of
care experienced school leavers in qualifications in 2025; and
b) Notes the continued focus on improving outcomes for care
experienced learners in North Ayrshire. 
1. Executive Summary 
1.1 In literacy and numeracy at SCQF Levels 4 and 5, North Ayrshire continues to perform
strongly in comparison with national figures. In 2025, attainment at Level 4 was above
national performance for both literacy (74%) and numeracy (80%). At Level 5,
attainment remained broadly positive. 
1.2  The average total tariff score for care experienced school leavers rose to 508 in 2025.
This is the highest figure in the 7 years of available data for this measure. 
1.3 In 2025, 85% of care experienced school leavers achieved at least one qualification at
SCQF Level 4 or better, while 65% achieved at least one Level 5 award, representing
an increase on the previous year. Notably, 42% attained at least one qualification at
Level 6, an increase of eight percentage points from 2024. 
1.4  Post-school participation for care experienced leavers remains a key strength with 94%
of care-experienced learners entering a positive destination, matching the highest level
achieved over the past five years. 
1.5  Alongside universal strategies to raise attainment, schools and the Service continue to
provide tailored and bespoke support for care experienced learners, ensuring that
targeted interventions respond effectively to individual needs and circumstances. 
2. Background 
2.1 The performance information in this paper is collated from two key sources: 
• The Local Government Benchmarking Framework (LGBF) which lists a range of
performance indicators for all 32 local authorities across Scotland, including a few
Agenda Item 6
39

Page 40

focused on care experienced learners, allowing performance to be considered
relative to others. 
• The ScotXed INSIGHT Benchmarking Tool, which is produced for schools and
education authorities to enable analysis and improvement planning across all key
national measures of attainment, filtered by those who have experienced care. 
2.2 Schools in North Ayrshire focus on the attainment for each care experienced learner by
the end of the Senior Phase (exit qualifications), rather than solely on the individual year
on year attainment pattern. The attainment of each learner across their Senior Phase is
more important than what they achieve in a single year (except for S4 leavers). 
2.3 The attainment data in this paper relates to the attainment of care experienced school
leavers who left school in session 2024-25, which includes leavers up to Christmas
2025. This is the most up to date school leaver attainment and reflects what was
published in February/March 2026 in the sources named above.
2.4 In session 2024-25 there were 92 care-experienced leavers. This represents 6.6% of
all school leavers in session 2024-25.  The average percentage of school leavers who
were care-experienced in the last 5 years is 6.9%. 
Care-experienced leavers by stage
Year S4 S5 S6 Total Percentage of
all leavers
2020-21 27 (26.5%) 44 (43.1%) 31 (30.4%) 102 7.4%
2021-22 21 (22.1%) 35 (36.8%) 39 (41.1%) 95 6.3%
2022-23 35 (34.7%) 29 (28.7%) 37 (36.6%) 101 6.8%
2023-24 35 (30.7%) 45 (39.5%) 34 (29.8%) 114 7.3%
2024-25 24 (26.1%) 31 (33.7%) 37 (40.2%) 92 6.6% 
2.5 In comparing the leaving patterns of care experienced learners to those of the overall
cohort (see parallel Cabinet paper “School Leavers’ Attainment and Achievement
2025”, 2 June 2026 for details), around double the proportion of care experienced
learners choose to leave school at the end of S4 compared to other S4 learners. A key
driver of future improvement will be ensuring that the needs of the care experienced
group of learners are met in terms of curriculum offer beyond S4. Getting this right
should help to reduce the proportion of care experienced learners leaving at the end of
S4 and enable schools to raise attainment for this key group. 
2.6 This paper will consider the performance of North Ayrshire schools as a group,
identifying trends and key highlights or areas for improvement in the following measures
of attainment:
• Care-experienced school leaver attainment in literacy and numeracy
• The average total tariff scores of care-experienced school leavers
• The breadth and depth of qualifications attained by care-experienced school
leavers
• Care-experienced school leaver initial positive destinations 
2.7 Throughout this report, the attainment of North Ayrshire’s care-experienced leavers will
mainly be benchmarked against previous NAC performance, as well as the performance
of the virtual comparator. Where available, comparisons will be drawn with equivalent
other local authority or national figures. 
40

Page 41

2.8 To support understanding of technical terminology, a glossary of key terms used
throughout this report is included at Appendix 1. 
2.9 It should be noted that the cohort size for care experienced school leavers varies from
year to year and is generally around 90-100 young people. Therefore, care must be
taken when analysing variations in performance for this group and, while there are
reasons to be positive about these results, we would also urge some caution on that
basis. For example, one care experienced learner attaining/not attaining a specific
qualification may account for more than 1 percentage point of a difference in the overall
attainment measures for care experienced learners (whereas in the general population,
one pupil would make less than 0.07 percentage points of a difference in the same
attainment measure). 
2.10 Schools have a clear narrative for individual circumstances of the learners in this group,
as these circumstances are bespoke to each individual learner. 
2.11 Secondary attainment meetings provide the opportunity for the Service and senior
school leaders to analyse attainment data to inform improvement priorities and
individualised support and allow for quality assurance of raising attainment activities
and approaches for care-experienced learners. 
2.12  Attainment in Literacy and Numeracy 
Year Level 3 Literacy 
or better
Level 4 Literacy
or better
Level 5 Literacy
or better
2020-21 91% 81% 53%
2021-22 97% 87% 59%
2022-23 94% 81% 50%
2023-24 90% 78% 45%
2024-25 95% 74% 50%
Average 21-25 93% 80% 51% 
In 2024-25, 74% of care-experienced school leavers achieved level 4 literacy or better,
which is lower than the average performance of this group over the last five years.
Literacy achievement at level 3 and level 5 are broadly in line with the average
performance over time. 
Year Level 3 Numeracy 
or better
Level 4 Numeracy
or better
Level 5 Numeracy
or better
2020-21 89% 63% 38%
2021-22 92% 80% 43%
2022-23 95% 77% 36%
2023-24 96% 75% 32%
2024-25 97% 80% 41%
Average 21-25 94% 75% 38% 
In 2024-25, numeracy achievement at levels 3 and 4 were the best performances in the
last five years at those levels. Attainment in numeracy at all levels in 2024-25 exceeded
the five-year average performance. 
41

Page 42

Despite some improvements in literacy and numeracy attainment for the care-
experienced cohort, we recognise that there is still significant scope for improvement to
reduce the gap between care-experienced and all other learners, as displayed in the
charts below. 
2.13 Improving attainment for all  
This measure focuses on the average total tariff score of the care-experienced
candidate’s latest and best qualifications, and is one of our Council Plan Performance
Indicators. Tariff points are assigned to each unit or course achieved by learners – in
all SCQF-graded awards, not just those provided by SQA (now Qualifications Scotland).
The data source for this measure is the ScotXed Insight benchmarking tool. 
42

Page 43

Various alternative certification models (ACMs) were in place for 2020 until 2023. The
“hump” in performance was anticipated. Exam arrangements returned to “normal” for
2024, which is the first year which can be reliably compared with the pre-pandemic
performance in 2019, the last time when “normal” exam arrangements were in place. In
2025, the overall average total tariff score for care-experienced leavers has begun to
rise again, up to 508 (the highest level over this period). 
2.14  Breadth and depth of qualifications attained 
Year 1 or more at
Level 3
1 or more at
Level 4
1 or more at
Level 5
1 or more at
Level 6
1 or more at
Level 7
2020-21 94% 85% 62% 40% 6%
2021-22 98% 91% 67% 35% 6%
2022-23 98% 87% 61% 33% 6%
2023-24 95% 85% 63% 34% 4%
2024-25 97% 85% 65% 42% 10% 
In 2025, 97% of care experienced school leavers attained at least one qualification at
Level 3, representing an increase of 2 percentage points from 2024. 85% of North
Ayrshire’s care experienced leavers attained at least 1 qualification at Level 4 or better,
the same as the figure for 2024. For Level 5, 65% of care experienced leavers achieved
at least 1 qualification at this level, which is 2 percentage points higher than the previous
year. The proportion of care experienced school leavers achieving at least 1 Level 6
award was 42%, 8 % points above the 2024 figure of 34%. For Level 7, 10% of care-
experienced school leavers achieved at least one award at this level which is 6
percentage points higher than 2024. Overall, there has been a strong performance in
terms of the care experienced leavers cohort in 2025 achieving a breadth and depth of
qualifications, comparing favourably to previous performances across a number of
levels. 
2.15 Post-school participation of care experienced school leavers 
The overall percentage of North Ayrshire care experienced school leavers entering a
positive destination has increased in 2025 to 93% which is broadly in line with the
highest figures over the last 5 years. 
43

Page 44

2.16 IMPROVEMENT ACTIONS 2026-27 
The Education Service 3-year Improvement Plan draft priorities have been created
collaboratively with Head Teachers of all schools to ensure there is a strategic focus on
improving attainment and achievement for all learners and ensuring that learners
receive equitable support. 
There is a specific section devoted to improving learning outcomes for specific groups,
including the care-experienced. For Secondary schools, there will an increased focus
on target-setting for care-experienced learner outcomes, the creation of more
collaborative and consistent approaches to tracking and monitoring, improving
pedagogical approaches and strengthening learner pathways and curriculum offers. 
A virtual Head Teacher will support schools across the service to ensure that attainment
outcomes of care-experienced learners continue to be maximised. Stretch aims for care
experienced learners will be refreshed and extended to maximise learner outcomes and
build on previous successes. Improved monitoring of attainment and achievement at
school and authority levels will be a key feature in evaluating improvement priorities and
will help to direct targeted resource where required. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Notes the content of the report, including the achievements of care experienced
school leavers in qualifications in 2025; and
b) Notes the continued focus on improving outcomes for care experienced learners in
North Ayrshire. 
4. Implications/Socio-economic Duty 
Financial 
4.1   None. 
Human Resources 
4.2   None. 
Legal 
4.3   None. 
Equality/Socio-economic 
4.4 Tackling inequality is a key aspect of this report. The Council is committed to a
continued focussed approach to improve outcomes for care experienced leavers. 
44

Page 45

Climate Change and Carbon 
4.5    None. 
Key Priorities 
4.6  Council priorities: 
The focus of the Education Service is to align with the Council Plan 2023-28 strategic
aim to ‘transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people’ and more specifically ‘improving educational attainment and
achievement and closing the attainment gap’ activities. 
Community Wealth Building 
4.7 The Council will continue to consider the pillars of community wealth building in any
future developments in this area. 
Islands Communities Impact Assessment (ICIA) 
4.8  None. 
United Nations Rights of the Child (UNCRC) 
4.9  The focus on improving attainment outcomes for all young people demonstrates our
commitment to Children’s Rights and our continued work to ensure children’s rights are
being met. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Education Quality Improvement Team has worked closely with Head Teachers to
analyse, interpret and agree next steps towards further improvements in attainment and
achievement. That work has formed the basis of this paper. 
Andrew McClelland
Chief Education Officer, Head of Service (Education) 
For further information please contact Kathleen McCormick, Executive Manager
(Education), on 01294 324418. 
Background Papers
None. 
45

Page 46

Appendix 1
GLOSSARY OF KEY TERMS USED IN THIS REPORT 
Care Experienced:
This term is used to describe anyone who has been looked after at any point in their
life, either through being subject to compulsory measures or through informal
arrangements. This term can be used to describe them, even after leaving care. 
Looked after:
This term is sometimes used to describe any child or young person who is currently in
the care system, either through being subject to compulsory measures or through
informal arrangements. Children can be “looked after at home” (by family members)
or “looked after away from home” (e.g. by foster carers or in a children’s house). 
Virtual Comparator: 
Virtual comparator (VC) data is constructed from the performance of individual pupils
with similar characteristics from schools in other local authorities. For every pupil in a
North Ayrshire school, 10 similar pupils are identified from across all schools in other
local authorities to be part of the virtual comparator’s data. This allows a comparison
based on some key pupil characteristics (gender, deprivation (SIMD decile), additional
support needs and stage of leaving) that are linked to educational outcomes.  
Average Total Tariff Score: 
Each qualification carries a number of tariff points, depending on the level and
complexity of award. The system counts the best tariff score the candidate achieves
in each qualification (the points are not counted for the same subject twice, so for
example, if a candidate achieves National 5 English one year and goes on to achieve
Higher English in a subsequent year, only the points for the Higher are counted). The
average total tariff score is arrived at by adding the tariff scores of all school leavers
and dividing by the number of leavers that year.   
SCQF levels: 
The Scottish Credit and Qualifications Framework (SCQF) is the national framework
for categorising all qualifications. The SCQF ranges from Level 1 to Level 12 based on
the level of difficulty and complexity of the learning. Levels 1-3 are the most basic
levels. Levels 4 and 5 are the equivalent of National 4 and National 5 qualifications.
Level 6 is the equivalent to Higher and Level 7 is the equivalent to Advanced Higher.
The remaining levels are for further and higher education qualifications, with Level 12
being doctorate level. 
46

Page 47

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    School Holiday Calendar – Academic Session 2027-28 
Purpose:  To inform Cabinet of changes to the school holiday calendar from
academic session 2027-28. 
Recommendation:  That Cabinet:
a) notes the significant level of engagement and consultation
with key stakeholders; and 
b) notes the resultant agreed changes to the school holiday
calendar, to be implemented from session 2027-28 onwards. 
1. Executive Summary 
1.1 The school holiday calendar sets out the days pupils are required to attend school and
the working year for teachers and other term-time staff, including the allocation of in-
service days, annual leave days and school closure days. 
1.2 The Education Service currently operates with two school holiday calendars. One for
schools on the mainland and Cumbrae, and another for schools on Arran. 
1.3 Consultation has taken place with key stakeholder groups to seek views on whether
there should be one school holiday calendar for all North Ayrshire Council schools. 
1.4 There was strong support across all stakeholder groups to move to one holiday calendar
for all schools from academic session 2027-28. 
1.5 There was strong support across all stakeholder groups that the school calendar from
academic session 2027-28 should allocate a 2-week break in October and reduce the
summer break by one week to facilitate this. 
2. Background 
2.1 The Schools General (Scotland) Regulations 1975, as amended, set the length of the
school year at 190 days for pupils. The distribution of those days across the calendar
year is a matter for individual education authorities. Furthermore, the Scottish
Negotiating Committee for Teachers (SNCT) sets the length of the school year for
teachers at 195 days and notes that annual leave for teachers is a matter to be
determined at a local council level, following consultation with teacher trade unions.
Agenda Item 7
47

Page 48

2.2 Consultation takes place annually within the Local Negotiating Committee for Teachers
(LNCT), with the proposed school holiday calendar then shared with the second tier
Joint Consultative Committee (JCC) as part of the wider consultation process. The
proposed school holiday calendar is subsequently also shared with schools who are
asked to feedback the views of their parent councils. 
2.3 School holiday calendars for mainland and Cumbrae schools have followed a similar
pattern for a number of years, with key school closure periods allocated to October (1
week), Christmas (2 weeks), Easter (2 weeks) and Summer (7 weeks), with a number
of long weekends allocated within school terms. 
2.4 School holiday calendars for Arran schools have historically followed a slightly different
pattern from the rest of the authority, with key school closure periods allocated to
October (2 weeks), Christmas (2 weeks), Easter (2 weeks) and Summer (7 weeks). 
2.5 The Education Service was keen to seek stakeholder views on moving to one holiday
calendar for all schools. An online survey was issued to stakeholder groups on 23
February 2026 and closed on 6 March 2026. Stakeholder groups included:
Parents/Carers; Teaching Staff; Early Years Staff; Support Staff; Facilities Management
Staff and Pupils. 
2.6 A total of 6813 survey responses were received, details of respondents as follows:  
Stakeholder Group Responses
Parent or Carer 4578
Teaching Staff 1073
Early Years Staff 227
Support Staff 492
Facilities Management Staff 178
Pupils 133
Other 132 
2.7 Of the responses received, 62% said it would be a good idea to have one set of school
holidays for all schools, 31% said this may be a good idea and 7% said this would not
be a good idea. 
2.8 Of the responses received, 73% said that it would be a good idea to align school holiday
calendars by moving to a 2-week holiday period in October for all schools. 9% said that
this may be a good idea and 18% said this would not be a good idea. 
2.9 Of the response received, 49% said a move to a 2 week holiday period in October for
all schools should be achieved by schools coming back one week earlier in the
2026/2027 school holiday year, 16% said the school holidays should start one week
later, 20% said they didn’t mind if schools came back from holidays one week earlier or
started one week later, and 15% didn’t agree with either option as they didn’t agree with
making any changes to school holiday calendars. 
48

Page 49

2.10 There are a number of potential benefits of the proposed holiday calendar. For example:
• Simpler planning and coordination across the education service. A single
holiday calendar would support the planning of key activities across the school
year and ensure all school term dates, holidays, closure days and in-service days
are aligned across all North Ayrshire schools and term-time early years settings.
• Better distribution of holiday periods throughout the year. Adding a week to
the October holiday could have benefits for mental health and wellbeing, giving
all pupils a two-week break between each term. Reducing the extended summer
holiday period by one week may also have benefits, as comments are often made
by some stakeholders that the current 7-week holiday is too long.
• Potential cost savings for some families. Introducing a 2-week break in
October may help families to access lower holiday prices outside the summer
period. 
2.11 The LNCT meeting of 11 March 2026 considered responses to the school holiday
engagement survey and agreed that the education service should move to one school
holiday calendar for 2027-28 for all schools, which includes a 2-week holiday period in
October, facilitated by an earlier return from the summer break in August 2027.  This
was also endorsed by JCC at their meeting of 12 March 2026. Further consultation with
schools/parent schools has also been supportive of this proposal. 
2.12 The school holiday calendar for 2027-28 will be published on the Council’s website
during June 2026, and existing published calendars for 2026-27 will also be amended
at this time 
2.13 It should be noted that the neighbouring Ayrshire Councils have also expressed an
interest in exploring the option of changing the duration of the October and summer
holiday periods. Should any changes to school holiday calendars subsequently be
approved in neighbouring Council areas, the Education Service will endeavour to align
key school holiday dates with neighbouring Ayrshire Council areas where possible,
recognising that some parents/carers with children in North Ayrshire schools work within
neighbouring councils. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) notes the significant level of engagement and consultation with key stakeholders;
and
b) notes the resultant agreed changes to the school holiday calendar, to be
implemented from session 2027-28 onwards. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
49

Page 50

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The introduction of a 2-week holiday period in October may enable some families to
take advantage of lower holiday prices outwith the summer period.
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 A single holiday calendar across the education authority will facilitate more efficient
simultaneous collaborative working to deliver on the wellbeing priority of the Council
Plan. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 The school holiday calendar survey included engagement with stakeholder groups on
the islands of Arran and Cumbrae. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The following groups were consulted on proposed changes to the school holiday
through an online survey: 
• Parents/carers
• Teaching staff
• Early Years staff
• Support staff
• Facilities management staff
• Pupils 
50

Page 51

5.2 Consultation on the proposed school holiday calendar for academic session 2027/2028
has taken place with: 
• LNCT
• JCC
• Schools / Parent Councils 
Andrew McClelland
Chief Education Officer, Head of Service (Education) 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294 324413. 
Background Papers
0
51

Page 52

School holidays and in-service dates 2027/28 (Arran & Mainland Schools) 
52

Page 53

School holidays and in-service dates 2027/28 (all schools) (text alternative)
August 2027
• Monday 2nd August to Wednesday 25th August: pupils on holiday
• Thursday 26th August and Friday 27th August: staff only in-service day
• Monday 30th August to Tuesday 31st August: children in school
September 2027
• Wednesday 1st September to Thursday 30th September: children in school
October 2027
• Friday 1st October: children in school
• Monday 4th October to Friday 15th October: pupils on holiday
• Monday 18th October to Friday 29th October: children in school
November 2027
• Monday 1st November to Thursday 18th November: children in school
• Friday 19th November to Monday 22nd November: pupils on holiday
• Tuesday 23rd November: staff only in-service day
• Wednesday 24th November to Tuesday 30th November: children in school
December 2027
• Wednesday 1st December to Wednesday 22nd December: children in school
• Thursday 23rd December to Friday 31st December: pupils on holiday
January 2028
• Monday 3rd January to Wednesday 5th January: pupils on holiday
• Thursday 6th January to Monday 31st January: children in school
February 2028
• Tuesday 1st February to Wednesday 16th February: children in school
• Thursday 17th February: staff only in-service day
• Friday 18th February to Monday 21st February: pupils on holiday
• Tuesday 22nd February to Tuesday 29th February: children in school 
53

Page 54

March 2028
• Wednesday 1st March to Friday 31st March: children in school
April 2028
• Monday 3rd April to Monday 17th April: pupils on holiday
• Tuesday 18th April to Friday 28th April: children in school
May 2028
• Monday 1st May: pupils on holiday
• Tuesday 2nd May to Friday 26th May: children in school
• Monday 29th May to Tuesday 30th May: pupils on holiday
• Wednesday 31st May: children in school
June 2028
• Thursday 1st June to Friday 30th June: children in school
July 2028
• Monday 3rd July to Monday 31st July: pupils on holiday
54

Page 55

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title:    Child Poverty Action Plan Progress Report 2025-26 
Purpose:  To consider and approve the Child Poverty Action Plan Progress
Report 2025-26 
Recommendation:  That Cabinet agrees to publication of the Child Poverty Action
Plan Progress Report 2025-26 provided at Appendix 1 and its
submission to the Scottish Government. 
1. Executive Summary 
1.1   This report presents the North Ayrshire Child Poverty Action Plan Progress Report
2025-26 which has been attached as Appendix 1. 
1.2 The Child Poverty Action Plan Progress Report is a statutory requirement by Scottish
Government and is the responsibility of local authorities and NHS Boards. This Progress
Report has been developed using a collaborative approach with internal and external
partners. It provides an update on the wide range of actions taken and progress made
for the year 2025-26.   
1.3  Changes to national methodology for measuring child poverty, using improved
Department for Work and Pensions household income data, mean that figures are not
directly comparable with previous years. Using this revised methodology, North
Ayrshire is identified as having the second highest rate of child poverty in Scotland both
before and after housing costs, reinforcing the scale and persistence of the challenge
locally. 
1.4 While national data indicates reductions in child poverty at a Scotland level, and locally,
we know that North Ayrshire continues to experience higher-than-average levels of child
poverty, with significant variation between communities. This underlines the importance
of sustained, system-wide action focused on both mitigating immediate impacts and
addressing longer-term drivers. 
1.5 A key development during 2025–26 has been the continued embedding of the Child
Poverty Strategy Team, providing central oversight of child poverty reduction and
mitigation activity across the Council and its partners. This has strengthened
coordination, use of evidence and alignment with wider system change programmes. 
Agenda Item 8
55

Page 56

1.6 The report highlights progress across the three recognised drivers of child poverty:
income from employment, reducing the cost of living, and maximising income from
social security and benefits in kind. The report is structured to outline the intent,
implementation, impact and next steps of activity; a structural approach praised by
reviewers at Public Health Scotland following the publication of our 2024-25 progress
report. 
1.7     Alongside delivery, the report evidences growing focus on systems change, including
early work to align with the Scottish Government’s Whole Family Support approach,
place-based partnership delivery, and co-designed tests of change through
programmes such as the Fairer Futures Partnership and the Collaboration for Health
Equity Scotland (CHES). 
1.8    This report also marks a transition point. From 2026 onwards, action to reduce child
poverty will be embedded within a new joint Children & Families Plan, alongside
children’s services and children’s rights responsibilities, strengthening integration,
accountability and long-term impact. 
2. Background 
Legislation, governance and process 
2.1.  Under the Child Poverty (Scotland) Act 2017, we have a statutory duty to jointly publish
a local child poverty action report with NHS Ayrshire and Arran. The report needs to
meet particular criteria, including how we are seeking to reduce child poverty and
describe any measures taken to support particularly vulnerable groups. Under the
legislation the report must be published as soon as reasonably practicable following
year end. 
2.2 In June 2023, Cabinet approved our Child Poverty Action Plan 2023-26, a joint plan with
our partners. This report provides the final annual update on progress against that plan. 
2.3 Our Child Poverty Action Plan 2023-26 was developed by the previous Tackling Child
Poverty and Cost of Living Board and is shaped around contributions captured through
a series of mini enquiries with community representatives. The resulting activities were
designed and delivered with consultation from partners and communities across North
Ayrshire. 
2.4 Feedback from Public Health Scotland on our 2024-25 Child Poverty Progress Report
recognised the clear structure, evident focus on the drivers of poverty, strong strategic
and operational alignment, and effective partnership working through the Community
Planning Partnership. Feedback also highlighted opportunities to strengthen future
reporting by placing greater emphasis on structural drivers of poverty, particularly
housing and transport, and by deepening the use of data and lived experience to better
understand impacts on priority family groups. This year’s report responds directly to that
feedback. Housing is more explicitly positioned as a system enabler for reducing child
poverty, with strategic housing activity, affordability pressures and prevention
highlighted as part of the wider whole-system response. The report also strengthens its
place-based analysis, including island and rural communities. 
56

Page 57

Child Poverty Statistics 
2.5   The most recent Scottish national child poverty figures, measured on an after housing
costs (AHC) basis, report a one-year rate of 18% and a three-year average of 21%.
These figures are published at national level using a revised methodology that
combines family resource survey data with linked Department for Work and Pensions
(DWP) administrative records, providing a more accurate picture of household income.
It is anticipated that this methodology with shift again, incorporating Social Security
Scotland data in the near future. 
2.6   Local authority-level child poverty figures are published separately and use a different
methodological approach. Using this local authority dataset, North Ayrshire’s AHC child
poverty rate is 18.1% in 2024 and 18.0% in 2025. While these percentages appear
broadly in line with the Scottish national figure, they are not directly comparable, as they
are derived from different data sources and methodologies for different purposes. 
2.7  It is therefore important for Cabinet members to note that Scottish national figures and
local authority figures should not be compared directly. The national statistics are
designed to show overall trends at Scotland level, while the local authority dataset is
designed to enable comparisons between councils. Under the local authority
methodology, North Ayrshire continues to rank among the areas with the highest levels
of child poverty, currently sitting second highest, behind Glasgow City (23.3%), with
Dumfries and Galloway (17.4%) being the closest lower-ranking authority. 
2.8 The difference in presentation can create the impression that North Ayrshire’s child
poverty rate is in line with, or below, the Scottish average, when in fact the two figures
answer different questions and serve different purposes. The local authority data
remains the appropriate measure for understanding North Ayrshire’s position relative to
other councils. 
2.8 It is estimated that approximately 7,000 children in North Ayrshire continue to
experience poverty with the impact unevenly distributed across communities. Some
areas continue to experience substantially higher rates, reinforcing the need for
continued, targeted and place-based action. 
2.9 This interpretation is consistent with Scottish Government guidance, Joseph Rowntree
Foundation analysis and DWP methodology notes. JRF and Save the Children have
published a report encouraging caution against over-reliance on headline poverty
statistics alone. The shifting and contrasting methodologies reinforce the importance of
combining quantitative data with place-based intelligence and lived experience to
understand how poverty is experienced locally and to inform effective action. 
Approach and action 
2.10 North Ayrshire continues to prioritise child poverty as a critical challenge. Activity during
2025–26 focused on mitigating immediate financial pressures on families, improving
access to income and services, and laying foundations for more preventative,
whole-system approaches. 
2.11 The six priority family groups are outlined in the Scottish Child Poverty Action Plan 2022-
26 ‘Best Start, Bright Futures’ as follows:
- Lone parents
57

Page 58

- Families with three or more children
- Families where the youngest child is under 1 year old
- Mothers aged under 25 years
- Households with someone with a disability
- Minority ethnic families 
2.12  We continue to focus our resources on supporting these six priority groups and
measuring the impact of our interventions. This report sets out the wide range of
activities undertaken by the Council and partners during 2025-26 to reduce child
poverty and outlines areas of focus for 2026-27 for approval for publication and
submission to the Scottish Government. 
2.13  The Child Poverty and Early Intervention Fund continued during 2025–26, supporting
co-designed, partnership-led initiatives. In April 2026, Cabinet approved for £276,000
child poverty budget to move over into the fund, with strengthened governance to
improve targeting, prevention and measurable impact. During 2025–26, approved
funding included: 
- Essential Skills Programme: £50,000 
A Community Learning and Development-led programme, informed by learning
from the Multiply project and delivered in partnership with employability and
community services, supporting core skills, digital inclusion and progression
towards work. 
- Swim and Skate: £18,000
Continued partnership delivery with KA Leisure, providing free access to physical
activity and reducing cost barriers for children and young people (see KA Leisure
report section). 
- Childcare Development: £107,000
Continued partnership support for a Council-hosted post and third sector activity to
build out-of-school childcare capacity, with significant progress in West Kilbride and
Kilwinning (see Childcare report section for full information).  
- Money Max: £227,000
Investment in five third-sector hosted posts working collaboratively to deliver
relational, expert support around finances, housing and debt management, aligned
with wider financial inclusion and advocacy pathways. 
- Family Enterprise Programme: £65,000
A partnership with Ayrshire College delivering a co-designed, accredited
entrepreneurship course for parents with a product or service they wish to
transform into a viable small business, with childcare support provided to improve
accessibility. On completion, participating parents can apply for a small business
start-up grant. 
- Fairer Futures Place-based Tests of Change: £112,000
Continued co-design with third sector partners and community members to test
relational, wraparound support models through named workers (see Fairer Futures
Partnership report section). 
58

Page 59

- Smart Data Foundry: £10,000
Investment to strengthen partnership understanding of poverty dynamics and
trends, and support more targeted, place-based decision-making using the
financial data platform. 
2.14 The report also covers a large range of other activities from colleagues and partners
intended to reduce or mitigate the impact of child poverty in North Ayrshire during 2025-
26. These are focused on the three main drivers of poverty: income for employment,
cost of living, and income from social security and benefits in kind. Key activities include: 
Income from Employment 
- Targeted employability programmes, including Skills for Life and We Work for
Families, supported parents into flexible, paid employment and vocational
placements aligned with family responsibilities.
- Work to remove childcare as a barrier to employment was strengthened through
increased childcare capacity, including in rural and island communities, supporting
parental progression into work.
- Community Wealth Building activity continued to promote fair, local employment
and progression opportunities, contributing to improved access to sustainable work
for parents experiencing poverty. 
Reducing the Cost of Living 
- Immediate cost-of-living pressures were mitigated through practical supports such
as the Fairer Food Network, free Active Schools provision, and targeted crisis
support, including the Island Emergency Cost of Living Fund.
- Action to reduce the cost of the school day, including free activities, clothing
support and transport, helped improve access to everyday opportunities for children
and young people.
- Affordable credit and financial resilience were supported through partnership work
with 1st Alliance Community Bank, reducing reliance on high-cost lending through
their Progressive Finance activity. 
Maximising Income from Social Security and Benefits in Kind 
- Money Smart, Welfare Rights and third-sector advice services supported families
to maximise income, address debt and improve financial stability through
accessible, stigma-free support.
- Embedding welfare rights support within schools and health settings improved early
access to entitlements in trusted environments.
- Integrated referral pathways and tests of change focused on reducing complexity
and improving uptake of benefits and in-kind support for priority family groups. 
2.15 The progress report outlines next steps for all activity included. Partners have
committed to building upon progress made during 2025–26 by strengthening prevention
and early intervention, improving access to income and support, and embedding
learning from place-based and whole-family approaches. This includes extending the
Child Poverty and Early Intervention Fund into 2026–27 with stronger governance and
targeting, continuing to test and scale effective partnership models, improving use of
data to better identify and reach priority families, and transitioning child poverty action
59

Page 60

into the forthcoming joint Children & Families Plan to support longer-term, sustainable
change. 
Reporting and planning: Next steps 
2.16 Both the Child Poverty Action Plan 2023–26 and the Children’s Services Plan 2023–26
conclude in 2026. In addition, new statutory duties relating to children’s rights reporting
will commence. 
2.17 Development work on our joint Children & Families Plan is in the final stages. This plan
will cover child poverty, children’s services and children’s rights for the period 2026 -
2029, enabling more integrated planning, reporting and delivery. 
3. Proposals 
3.1 That Cabinet agrees to publication of the Child Poverty Action Plan Progress Report
2025-26 provided at Appendix 1 and its submission to the Scottish Government. 
4. Implications/Socio-economic Duty 
Financial 
4.1  None. 
Human Resources 
4.2  None. 
Legal 
4.3 This report meets our statutory obligations under the Child Poverty (Scotland) Act 2017. 
Equality/Socio-economic 
4.4 The activity outlined within the Progress Report at Appendix 1 actively seeks to improve
the socio-economic outcomes for North Ayrshire residents. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Child Poverty Action Plan Progress Report 2025-26 directly demonstrates activity
that contributes to our four Council Plan priorities, with a particular focus on transitioning
to a Wellbeing economy. 
60

Page 61

Community Wealth Building 
4.7 A range of activity was undertaken with partners during 2025-26, as outlined in the
report at Appendix 1, which contributed to our Community Wealth Building approach, in
particular the ‘fair employment’ pillar. 
Islands Communities Impact Assessment (ICIA) 
4.8 There are no Islands Communities Impact Assessment implications arising from this
report. 
United Nations Rights of the Child (UNCRC) 
4.9 The publication of the Child Poverty Action Plan Progress Report 2025-26
demonstrates our commitment to Children’s Rights and our continued work to ensure
children’s rights are being met. 
Consumer Duty 
4.10  None. 
5. Consultation 
5.1 Members of the Community Planning Partnership including NHS Ayrshire and Arran,
TACT, Arran CVS and the HSCP contributed to the content of this report. 
Sam Anson
Executive Director (Education) 
For further information please contact Laura Kayes, Policy & Performance Officer (Child
Poverty), on laurakayes@north-ayrshire.gov.uk. 
Background Papers
Appendix 1: Child Poverty Action Plan Progress Report 2025-26
61

Page 62

1 
Child Poverty Action Plan 2023 – 2026 
Progress Report 2025 - 2026 
62

Page 63

2 
Contents 
1. Executive Summary        p3 
2.           Introduction          p4 
3.  Progress So Far         p6 
3.1  Income from Employment 
- Key Activities, Impact and Next Steps     p9
- Case Studies        p15 
3.2  Reducing the Cost of Living 
- Key Activities, Impact and Next Steps     p16
- Case Study         p26 
3.2.1 Our Island Communities       p27 
3.3 Income from Social Security and Benefits in Kind 
- Key Activities, Impact and Next Steps     p28 
3.4 Systems Change 
- Whole Family Wellbeing Fund      p34
- Case Studies        p34
- Whole Family Support        p35
- Collaboration for Health Equity Scotland     p36
- Fairer Futures Partnership       p37
- Community Wealth Building      p39
- Housing as a Systems Enabler for Reducing Child Poverty  p39
- Young Carers        p41 
4.  Conclusion          p43 
5.  Appendices           
5.1  North Ayrshire Child Poverty Action Plan 2023-26    p44 
For anyone requiring support with the cost of living, please visit our dedicated Cost of Living webpage
or call 01294 310000.
63

Page 64

3 
1. Executive Summary
Welcome to our 2025–26 Progress Report on Child Poverty in North Ayrshire.
This report sets out the actions taken by North Ayrshire Council, NHS Ayrshire & Arran and partners
across the Community Planning Partnership (CPP) to reduce and mitigate the impacts of child
poverty, as part of our shared ambition to eradicate it.
Child poverty remains one of the most significant and complex challenges facing our communities.
Recent changes in national methodology for measuring child poverty, using improved Department for
Work and Pensions (DWP) household income data, provide a more accurate picture of need but
reduce the validity of comparisons with previous years. What is clear is that the scale of the issue
within North Ayrshire remains significant and underpins the need for sustained systems-wide action
for children and families in our area.
Addressing child poverty is central to the Council Plan 2023–28, which sets out a mission of ‘A North
Ayrshire that is fair for all’. Membership across the Community Planning Partnership Board ensures
senior leadership, accountability and shared ownership of this agenda across partners. This report
reflects the collective effort underway across the Council, Health and Social Care Partnership, NHS
Ayrshire & Arran and the Third Sector to drive long-term change.
This report highlights progress against the three nationally recognised drivers of child poverty:
- income from employment
- reducing the cost of living
- maximising income from social security and benefits in kind
This report also marks a point of transition. While it represents the final standalone progress report
under North Ayrshire’s Child Poverty Action Plan 2023–26, it has been developed alongside work to
establish a joint Children and Families Plan. From 2026 onwards, action to reduce child poverty will
be embedded within this integrated planning framework, recognising child poverty as a cross-cutting
determinant of the realisation of children’s rights, wellbeing, safety and life chances.
This shift reflects an ongoing commitment to a more joined-up, whole-system approach, ensuring
that efforts to increase income, reduce costs and improve outcomes for children are fully aligned
with wider priorities for family support, early intervention and prevention.
We recognise that child poverty is a long-term, complex and deeply rooted challenge, and the work
outlined here demonstrates our continued commitment to coordinated, evidence-informed action.
By listening to families, working alongside communities, and strengthening how our system
responds, we will continue to take meaningful steps towards a fairer North Ayrshire for all children. 
Sam Anson
Executive Director of Education
North Ayrshire Council
Professor Gordon James
Chief Executive 
NHS Ayrshire and Arran
64

Page 65

4 
2. Introduction
This report outlines progress made during 2025–26 to reduce and mitigate the impact of child poverty,
in response to actions set in our Child Poverty Progress Report from 2024-25.
Recent changes to national methodology for measuring child poverty have improved the accuracy of
such data but, regrettably, mean that national and local figures are not directly comparable with
previous years. Using improved DWP household income data, North Ayrshire is identified as having
one of the highest child poverty rates in Scotland. While challenging, this provides a clearer evidence
base and reinforces the need for ambitious, sustained and system-wide action.
A key development during this reporting period has been further embedding of the Child Poverty
Strategy Team, providing central oversight, coordination and leadership on systems change. The team
works across directorates and partner organisations to strengthen collaboration, improve use of data
and evidence, and embed robust evaluation. A critical priority has been the authentic inclusion of
community voice and lived experience, supported through Scottish Government Fairer Futures
Partnership funding. This includes early co-design activity with third sector partners and community
members to develop person-centred, trauma-informed interventions that reflect the realities of family
poverty.
Progress during the year reflects a whole-system approach focused on the three key drivers of child
poverty from Scottish Government’s Best Start, Bright Futures: Tackling Child Poverty Delivery Plan
2022–26: 
Income from Employment - Targeted employability programmes, including Skills for Life and We
Work for Families, supported parents into paid work and vocational placements.   These programmes
are part of Your Next Move Working North Ayrshire which also delivers employability support to
unemployed parents as well as funding for accredited training for employed parents to enable them
to upskill and increase earnings through improved employed.  Tailored, flexible opportunities aligned
with family responsibilities help increase household income, improve mental wellbeing and support
positive outcomes for children. Work to address childcare as a barrier to employment was further
strengthened through a large-scale childminder recruitment programme, increasing childcare
availability across North Ayrshire, including rural and island communities.
65

Page 66

5 
Reducing the Cost of Living - Immediate, practical supports continued through initiatives such as
the Fairer Food Network, free Active Schools provision, community-based crisis supports and
affordable credit through Progressive Finance. These interventions reduced household costs,
prevented crisis and improved access to essential goods, services and activities. 
Maximising Income from Social Security and Benefits in Kind - Financial inclusion pathways,
including Money Smart, Health Visitor referrals and third sector partnerships, supported families to
maximise income, address debt and improve financial resilience. Integrated service delivery ensured
families could access multiple forms of support in familiar, trusted settings.
A significant theme throughout the year was a growing focus on systems change, supported by
increased investment in partnership working, community-led approaches and early intervention.
Early work to embed the Scottish Government’s Whole Family Support approach has begun to shape
more joined-up and flexible thinking, helping partners better recognise the interconnected financial,
social, physical and emotional needs of children and families. 
While challenges remain, this report demonstrates clear progress and a strengthened foundation for
future action. By continuing to work collaboratively and learn alongside families and communities,
North Ayrshire is committed to making a tangible difference to the lives of children living in poverty. 
66

Page 67

6 
3. Progress So Far
North Ayrshire’s Child Poverty Action Plan 2023–26 is tailored to local needs across the key actions
(see Appendix 5.1) and includes a specific focus on the six national priority family groups:
- lone parent families
- families with three or more children
- families with a child under one year old
- families where the mother is under 25
- families with a disabled adult or child
- ethnic minoritised families
While we continue to explore opportunities to further improve data-sharing practices, progress is
already being made through improved partnership working and better use of available data sources,
including our investment in access to Smart Data Foundry. Refinements to funding criteria and
service commissioning are helping ensure support is available in the communities where need is
greatest.
Geography also plays a significant role in shaping local responses. Rural and island communities
face distinct challenges related to transport, childcare availability and access to services. These
factors are reflected throughout the actions outlined in this report. 
The interconnected nature of the three drivers of child poverty means families often experience
multiple, overlapping pressures. In response, North Ayrshire has continued to strengthen a holistic,
whole-family approach, recognising that financial security, wellbeing, housing, childcare and access
to services cannot be addressed in isolation.
Working towards Collective Impact
A range of multi-agency initiatives continue to deliver both direct and indirect benefits for families
experiencing poverty in North Ayrshire. Governance for child poverty activity remains within the
Community Planning Partnership, with the Community Planning Partnership Senior Officers Group
providing strategic oversight and shared accountability across partners.
Our Child Poverty and Early Intervention Fund has been continued and aligned to priority areas
identified through partnership learning, lived experience and emerging data. During 2025–26,
approved funding included:
- Essential Skills Programme (£50,000)
A Community Learning and Development-led programme, informed by learning from the
Multiply project and delivered in partnership with employability and community services,
supporting core skills, digital inclusion and progression towards work. 
- Food Larders and Community Shops (£100,000)
The CPEIF provided funds to continue support to 16 local food larders / community shops in
25/26 as we support groups to transition to self-sustaining models where possible.
67

Page 68

7 
- Housing Advisor within CHAP (£53,000)
This funded role focuses on providing expert advice to families on housing issues,
homelessness prevention, and related social security support. As of December 2025, 60
individuals had been referred to the service. 25% of those referred fell within at least one child
poverty priority family group, and several families are represented across multiple priority
groups. Over a third of cases have since been closed following successful resolution, and
those ongoing are receiving continuing support. The work is also generating key learning,
evidencing increased complexity of cases requiring multi-agency work, higher demand for
representation at Summary Court and gaps in early intervention for at-risk tenants. 
- Swim and Skate (£18,000)
Continued partnership delivery with KA Leisure, providing free access to physical activity and
reducing cost barriers for children and young people (see Active Schools and KA Leisure
section). 
- Childcare Development (£107,000)
Continued partnership support for a Council-hosted post and third sector activity to build
out-of-school childcare capacity, with significant progress in West Kilbride and Kilwinning (see
Childcare section below for full information). 
- Money Max (£227,000)
Investment in five third-sector hosted posts working collaboratively to deliver relational, expert
support around finances, housing and debt management, aligned with wider financial
inclusion and advocacy pathways. 
- Family Enterprise Programme (£65,000)
A partnership with Ayrshire College delivering a co-designed, accredited entrepreneurship
course for parents with a product or service they wish to transform into a viable small
business, with childcare support provided to improve accessibility. On completion,
participating parents can apply for a small business start-up grant. 
- Fairer Futures Place-based Tests of Change (£112,000)
Continued co-design with third sector partners and community members to test relational,
wraparound support models through named workers (see Fairer Futures Partnership section
below for full information). 
- Smart Data Foundry (£10,000)
Investment to strengthen partnership understanding of poverty dynamics and trends, and
support more targeted, place-based decision-making using the financial data platform.
68

Page 69

8 
Alongside this funded activity, North Ayrshire continues to participate in the Collaboration for Health
Equity Scotland (CHES), led locally by the Education Directorate and the Health and Social Care
Partnership. This work applies learning, data and research to address the social determinants of
health through a place-based, whole-system approach (see Systems Change section below for full
information).
Together, these represent just a selection of the partnership-led programmes that support North
Ayrshire’s transition towards a wellbeing economy, strengthening prevention, improving access to
support and contributing to sustained action to reduce child poverty. 
69

Page 70

9 
3.1 Income from Employment – Key Activities, Impact and Next Steps
Increasing income through fair, sustainable employment is a central pillar of North Ayrshire’s
response to child poverty. Our approach recognises that parents experiencing poverty often face
multiple, interrelated barriers including childcare, confidence, health, skills and affordability of work.
Activity during 2025–26 focused on flexible, supported routes into employment that align with family
life through strength-based partnership working. 
High level trends over time:
Description 2020 2021 2022 2023 2024 2025 Source 
Percentage of
working age
population in
employment
67.7% 64.7% 73.6% 70.3% 64.2% 69.5% ONS/NOMIS
Gross weekly
earnings - Workforce
based
£587.10 £592.20 £654.70 £713.20 £742.80  £798.6 
(median
figure)
ONS Annual
Survey of
Hours and
Earnings
Employment rate
Percentage (women)
63.4% 64.4% 71.9% 68.7% 63.1% 67.3% ONS/NOMIS
Employment rate
work limiting
disabled
44.3% 44.7% 51.7% 39.2% 34.3% 36.7% ONS/NOMIS
Youth employment
rate
55.3% 42.2% 66.1% 57.8% 46.1% 43.6% ONS/NOMIS
Total economic
inactivity (percentage
of those aged 16-64
who are economically
inactive)
- - - - 33%
(Calendar
year)
27.9%
(Academic
year)
ONS/NOMIS 
These figures indicate a mixed picture, with overall employment rates increasing from 2024 to 2025
alongside an increase in gross weekly earnings. In contrast, there are continued challenges in youth
employment, employment for disabled people and economic inactivity. This reinforces the
importance of our approach of providing targeted, flexible employability support aligned to priority
family groups. 
Childcare as an Enabler of Employment: Pre-School Childcare
Intent
To increase availability of flexible, affordable childcare in North Ayrshire, particularly in rural and
island communities, enabling parents to take up employment, training and education.
Implementation
North Ayrshire Council partnered with the Scottish Childminding Association (SCMA) to recruit and
support new childminders during 2025–26. 
70

Page 71

10 
Delivery included:
• Targeted and North Ayrshire wide promotion
• Discovery sessions (4 in-person, 8 online)
• Training, workforce support and start-up grants
• Ongoing employability and business support
Priority areas included our rural and island communities in Arran, Cumbrae, the North Coast and
Garnock Valley.
Impact
• 24 individuals supported through the programme
• 19 new childminding businesses progressing
• Up to 114 new full-time childcare spaces created
• The number of childminders on Arran doubled, including provision on the west of the island
where none previously existed
The programme exceeded its target of recruiting 20 childminders and demonstrated strong demand
for childminding as a viable, flexible career pathway.
Next Steps
The programme has been recommissioned for 2026–27 with a further target of recruiting 20 new
childminders, with continued learning around rural housing constraints, regulatory changes and
business sustainability. 
Supporting Childcare Providers: School Age Children
Intent
This initiative aims to strengthen and future-proof third sector school aged childcare (SACC) provision
across North Ayrshire. By improving the sustainability, quality and availability of childcare before and
after the school day, the project supports parents to access and sustain employment, increase
household income and improve economic stability for families. Addressing gaps in childcare
provision is a key enabler for workforce participation, particularly in areas experiencing poverty.
Implementation
During 2025–26, Connected Communities worked with nine third sector SACC providers (some
operating multiple services) to enhance sustainability and responsiveness to local need. Support
included:
- Workforce development through in-person and online training, qualification funding and
regulatory support
- Assistance with premises, including alignment with schools where buildings could be
accessed at no cost and establishment of keyholding agreements where year-round access
was required
- One-to-one business and service development support, alongside regular network meetings to
strengthen collaboration across the sector
71

Page 72

11 
- Support for parents to establish a new SACC service in a rural village, responding directly to a
gap in local provision
- Development of new breakfast club provision in schools and community venues
- Joint working with We Work for Families and Employability services to fund childcare places
for parents undertaking training or work placements
Impact
The initiative has significantly strengthened childcare capacity and supported parental employment
across North Ayrshire:
- 9 SACC organisations supported, equating to 346 registered childcare places
- 1 new service created, providing an additional 24 childcare places
- 26 schools now have registered after-school provision (including pick-up services)
- 3 new breakfast clubs established
- 72 hours of training delivered across 13 sessions, with 161 staff attending
- Professional development supported, including SCQF Levels 7, 8 and 9 qualifications
- 59 one-to-one sessions delivered with providers and 15 network meetings held
Evidence from questionnaires and case studies demonstrates that accessible, affordable and trusted
childcare enables parents to engage in employment, training and progression opportunities, while
providing high-quality play and learning experiences for children and young people.
Next Steps
This work will continue, with additional new SACC services in development within the Kilwinning
locality to address remaining gaps in provision. The post currently supporting this initiative is funded
until May 2026, and discussions are underway to determine how this important work will be sustained
and supported beyond that point. 
Your Next Move Working North Ayrshire
Intent
Your Next Move Working North Ayrshire provides a coordinated employability offer for parents,
designed to increase household income and reduce child poverty through access to fair work, skills
development and progression. The programme supports both unemployed and employed parents,
recognising that reducing child poverty requires action not only to support people into work, but also
to help parents already in work to increase hours, gain qualifications and improve earnings.
Implementation
During 2025–26, Your Next Move Working North Ayrshire brought together a range of employability
activity for parents under a more coherent and accessible local offer. This included support for
unemployed parents through tailored employability pathways, including paid placements, vocational
training, in-work support and confidence building, alongside progression support for employed
parents through access to accredited training and upskilling opportunities.  These programmes
registered 800 new parents to engage in a journey towards employment.
72

Page 73

12 
The programme has helped strengthen alignment between employability services and wider family
support, ensuring that parents can access help that reflects the realities of family life, including
caring responsibilities, childcare needs, transport barriers and financial pressures. By linking
employability support with wider advice and referral pathways, the approach contributes to a more
joined-up and person-centred response.
Your Next Move Working North Ayrshire also provides a framework through which key parental
employability activity is delivered, including Skills for Life and We Work for Families. This creates
clearer pathways for parents to move between different forms of support depending on their
circumstances, stage of readiness and progression goals.
Impact
Your Next Move Working North Ayrshire has strengthened the visibility and coherence of North
Ayrshire’s parental employability offer, making it easier for families and partners to understand and
access available support. By bringing together support for both unemployed and employed parents,
the programme reflects a broader understanding of in-work poverty and the need to support
progression as well as entry to employment.
The programme contributes to child poverty reduction by helping parents access employment,
increase confidence and skills, and improve longer-term earning potential. It also strengthens
partnership working across employability, education, financial inclusion and family support services,
helping create more responsive and flexible pathways for parents.
Next Steps
In 2026–27, Your Next Move Working North Ayrshire will continue to develop as a more integrated
parental employability offer. This will include strengthening progression routes between programmes,
increasing awareness of the support available to employed parents, and improving how impact is
captured across the full pathway from initial engagement through to sustained employment and
increased earnings. 
Skills for Life – Parental Employability
Intent
Skills for Life aims to increase household income and reduce child poverty by supporting unemployed
parents into paid, flexible employment that fits around family responsibilities. The programme is
designed to address key barriers to work, including childcare, wellbeing and financial insecurity,
while acting as a bridge into sustained employment. It contributes to the No One Left Behind agenda
and Community Wealth Building by reducing parental unemployment and improving family stability.
Implementation
Skills for Life is a Scottish Government–funded employability programme delivered by North Ayrshire
Council. During 2025–26, parents with dependent children were supported into 26-week paid
placements (10–20 hours per week) within Council services, including clerical roles, facilities
management and pupil support. Placements were paid at the Real Living Wage and scheduled to
align with school hours.
73

Page 74

13 
Participants received:
- Job specific training and employability skills development
- Accredited learning, including PC Passport and SVQ Level 2 in Administration
- A comprehensive 26-week in-work support package, including mentoring, keyworker support,
CV development and job search assistance
Delivery was supported through partnership working with DWP, We Work for Families, CHAP, Salus,
Ayrshire College and a wide range of Council services hosting placements.
Impact
This year:
- 86 parents were supported into paid Council placements
- 20 participants achieved PC Passport
- 15 participants achieved SVQ Level 2 in Administration
- 49% of participants who completed or exited early are already in sustained employment, with
final outcomes to be confirmed following late starts.
Qualitative feedback from families highlights improved mental wellbeing, increased financial stability
and positive impacts on children, including greater participation in activities, improved routines and
reduced stress at home. Parents reported increased confidence, a sense of pride and the ability to
provide more consistently for their families, demonstrating the programme’s wider social and
emotional benefits. 
Next Steps
In 2026–27, Skills for Life will continue to expand, with a further 70 placements across Council
services and 20 placements with local employers delivered as a recruitment incentive. The
programme will continue to focus on progression into sustained employment while strengthening
links with employers and childcare-supporting services. 
Equal Programme 
Intent
The Equal Programme supports disabled people, those with long-term health conditions and mental
health issues to move towards and into employment through tailored, person-centred support. 
74

Page 75

14 
Implementation
Delivered in partnership with specialist providers, the programme helps participants build
confidence, address barriers, access skills development and progress towards fair and sustainable
work. This is particularly important in the context of child poverty with respect to priority family
groups, as disability and poor health can significantly reduce household income and increase
financial pressure for families. By improving access to employability support for those furthest from
the labour market, this contributes to greater inclusion, improved financial resilience and better long-
term outcomes for individuals and families.  
Impact
During 2025-2026, 86 new participants were supported with 57 people progressing employment, 7
people progressing to college and 2 people progressing to training, this is a progression rate of 77%
which is a high performing mainstream employability programme.  
Next Steps
The Equal Programme have recently moved to a new location creating a Specialist Employability
Support Hub within Lochshore Park, unlocking more opportunities to provide vocational experiences
providing pathways to sustainable employment. 
We Work for Families
Intent
To support parents who are furthest from the labour market to improve confidence, skills, resilience
and financial stability, enabling progression into employment or paid placements.
Implementation
Delivered in partnership with The Lennox Partnership, We Work for Families provided tailored
employability support including skills development, paid placements and action planning. During
2025–26:
- Nearly 400 families registered
- 115 parents moved into employment
- 85 parents entered paid placements
Support included “Better Off” calculations to assess financial impact alongside qualitative
engagement with parents.
Impact
Around 200 families are recorded as being financially better off as a direct result of participation.
Individual case studies below.
Next Steps
The programme will continue to strengthen links with childcare solutions, Skills for Life placements
and Community Wealth Building activity, aiming to reach 450 new registrations in the coming year. 
75

Page 76

15 
Case Studies - We Work for Families 
To conclude:
Whilst increasing income through employment is critical, we recognise that for many families this
alone is not sufficient to offset rising household costs, reinforcing the importance of our continued,
complementary action to reduce the cost of living.  
76

Page 77

16 
3.2 Reducing the Cost of Living – Key activities, Impact and Next Steps
Reducing household costs plays a critical role in preventing crisis and supporting families to meet
essential needs whilst longer-term, sustainable income solutions are developed. 
High level trends over time:
Description
*Locally sourced data 2020 2021 2022 2023 2024 2025
Percentage of
households managing
well financially
Data not
available
Data not
available 47% 47% 50% 48.1%
*Number of new build
housing units reaching
completion (all tenures)
(Actual not cumulative)
-- -- 562 384 371 430
*Number of children
receiving school clothing
grants
-- -- 6,135 5,987 6,219 6,734
*Number of families
receiving school clothing
grants  
3,864 3,943 3,869 4,430 
The increase in school clothing grant uptake and sustained pressure on household finances
highlights continued financial strain for many families, reinforcing the importance of cost-reducing
interventions. Looking forward, through use of the Smart Data Foundry we will be able to monitor
financial resilience across communities on a more real-time basis. 
North Ayrshire Fairer Food Network
Intent
To provide accessible, dignified food provision alongside holistic support to reduce financial pressure
and prevent crisis.
Implementation
During 2025–26, 16 community food larders operated across North Ayrshire, delivering food support
alongside onsite and referral-based services including Money Smart, energy advice, welfare support
and health interventions. Partnerships with local growers strengthened local supply, while health
promotion activity was embedded in familiar, community-based settings.
Impact
• 26,806 visits recorded across the network
• Families reported reduced need for emergency support
• Access to food support was combined with income maximisation, energy advice and health
interventions
77

Page 78

17 
• Increased access to fresh, locally grown produce
The network also supported health initiatives through partnership working with KA Leisure including
smoking cessation, oral health, period poverty support and cardiovascular health checks.
Next Steps
Continued development of integrated outreach within larder settings, strengthening preventative
health engagement and financial inclusion pathways. 
Cost of Pregnancy – BadgerNet Review
Intent 
To support families with a child under one, a national priority family group, by improving access to
clear, timely information on financial rights, entitlements and local support during pregnancy and the
post-natal period. The aim was to provide information specific to each Local Authority Area to reflect
the variation in the offer across the Ayrshire and Arran Board area, bring all the key contacts together
into one concise document and make the information accessible to all.
Implementation 
In January 2026, NHS Ayrshire & Arran undertook a review of the financial support information
available through BadgerNet, the NHS maternity app. The review identified gaps in accessible
financial inclusion information for patients across the three Local Authority areas that was specific to
their own area. In response, the Health Improvement Team worked in partnership with IFAN
(Independent Food Aid Network) to update their leaflet series: ‘Worried About Money’ to reflect recent
changes to the services and support for financial inclusion across North Ayrshire. This highlights the
available support for a range of financial situations that includes primary prevention of poverty, early
intervention for families at risk and crisis support for those who need it. 
78

Page 79

18 
NHS Ayrshire & Arran’s Antenatal Rights campaign leaflets were added to the suite of information
available, outlining pregnant employees’ rights to paid time off for antenatal care and the
responsibility of employers to provide the statutory minimum allowance to expectant parents to
access antenatal care, as well as any discretionary additional support they may provide. This was
shared internally across NHS Ayrshire and Arran intranet system to make staff aware of their rights,
across the Healthy Working Lives database of over 600 employers across Ayrshire and through social
media channels including Facebook and LinkedIn. These have been made available in a range of
formats, including easy read and hard copies for use across the community where people may have
barriers to access.
Impact
The updated resources improve awareness of financial entitlements and crisis support at a key life
stage, supporting early access to income maximisation, food support and employment rights
information, that will allow families to plan ahead for the arrival of their baby and utilise any financial
support available. It helps keep access to antenatal care equal across the range of industries and
employment contracts so there is no dilemma between prioritising maternal health against financial
loss. This intervention strengthens preventative action by reaching families before financial pressures
escalate and allows families access to early help if they experience challenges. There is a variety of
support sources available that cover the wider determinants of financial problems from crisis support
to debt management to financial abuse.
Next Steps
Ongoing monitoring of analytic data from social media platforms will indicate whether the
information is reaching members of the public. The Health Information Resource Service will monitor
uptake of the IFAN leaflets through their ordering system. 
Infant Food Insecurity Pathway
Intent 
To provide supportive information for Midwives, Health Visitors, Family Nurses and support staff who
are working with families who have infant children and who are experiencing money worries, including
those who are struggling to afford infant formula, before and at crisis point. The guidance provides
information on available resources, including financial inclusion services in each HSCP area.
Implementation 
Following development in the previous reporting period, the Infant Food Insecurity Pathway was
presented to the Maternal and Infant Nutrition Programme Board and disseminated widely to Health
Visiting and maternity services. The guidance gives Family Nurse Partnership staff step by step
direction towards training, resources and services in the Local Authority Area to help parents
maximise their income and access all the financial, physical and practical support available to
maintain good health in a child’s early years. Dissemination to the Infant, Children and Young
People’s Transformational Change Board Members allowed for dissemination through the locality
teams, providing a handbook for information and good practice. 
79

Page 80

19 
Impact 
The pathway highlights to practitioners the training that is available to increase their familiarity of the
support available both to them and families around income maximisation and health related
resources such as Best Start vouchers and cash first funds. It strengthens practitioner confidence
and consistency in responding to infant food insecurity, supporting early referral to financial inclusion
and community support services. Practitioners are aware of the national campaigns, such as Child
Poverty Week, that they can tap into to promote up to date information and advice on infant feeding
and health in relation to income. 
Next Steps 
Further embedding of the pathway within practice and alignment with improved national child health
data reporting. NHS Family Nurse Partnership will assess awareness and usefulness of the
resources, with scope to expand financial inclusion content within BadgerNet where appropriate. This
will be carried out through the Pan Ayrshire Documentation Group and updates will be made to the
pathway according to the findings. 
80

Page 81

20 
Active Schools
Intent
Active Schools aims to provide high quality opportunities for children and young people to participate
in sport and physical activity before school, during lunchtimes and after school, while developing
effective pathways between schools and local sports clubs. The programme directly supports child
poverty objectives by addressing the Cost of Living and Cost of the School Day, recognising that
financial barriers can significantly limit participation in activities that support wellbeing, confidence
and personal development.
Implementation
During 2025–26, Active Schools embedded a clear and consistent principle that all provision is
entirely free at the point of access, ensuring no child or family is excluded due to cost. This fully
funded approach applied to:
- Extra-curricular activity delivered in all primary, secondary and ASN schools
- Locality-based and authority-wide Active Schools events
- Leadership programmes supporting skills development and progression into sport
- Holiday programme activities providing safe, inclusive opportunities during school breaks
Active Schools and KA Leisure continued to work in close partnership to strengthen links between
school-based activity and community provision across all six localities. Focused work to identify and
address gaps in provision supported a more equitable offer, regardless of geography. 
Active Schools and Communities Partnership Officers (ASCPOs) played a key role in delivering
targeted interventions for young people facing the greatest barriers to participation, including those
who are care-experienced, living in poverty, at risk of disengagement, non-attendance and those with
additional support needs.
Delivery was supported by strong community involvement, with 703 deliverers contributing to
sessions during the year, 98% of whom were volunteers. This was the highest proportion recorded of
any Active Schools programmes nationally.
Impact
Active Schools achieved high levels of reach and sustained engagement:
- 9,781 young people participated in sport and physical activity, representing over 53% of our
school-aged population
- 13,065 sessions delivered, generating 271,061 participant visits, demonstrating regular and
sustained participation
- 5,310 participants engaged in 75 Active Schools events, delivered at cluster, locality and North
Ayrshire-wide levels
- 60 community sports clubs actively engaged, strengthening pathways from school into
community sport
Targeted impact data shows us that this year we saw:
- Increased participation and sustained engagement among young people experiencing poverty
- Higher engagement and frequency of participation among care-experienced young people
81

Page 82

21 
- Continued year-on-year increases in participation among ASN pupils, supported through
strengthened Ayrshire-wide ASN competition and programming
- Increased participation by girls, with girls attending events at higher rates than boys
- Higher uptake of holiday activity among young people living in SIMD 1 and 2 areas
The ASCPO delivery model – experiential activity followed by supported participation and transition
into community-based sport – has proven particularly effective for targeted groups. The programme’s
person-centred, young-person-led ethos remains a key strength and is reflected in positive wellbeing,
confidence and engagement outcomes. 
Next Steps
Active Schools is entering the final year of its current partnership agreement with sportscotland
(2026–27). Early discussions are underway with key stakeholders to support continuity and strategic
alignment ahead of the next partnership period 2027–2031.
A recent national review of Active Schools will shape the future direction of the programme. As further
guidance on aims, priorities and outcome measures is confirmed, this will inform local planning,
resourcing and delivery in North Ayrshire.
The transition into the next partnership period provides an opportunity to refine our approach,
strengthen impact and reinforce the contribution of Active Schools to health, wellbeing, equity and
community outcomes, while continuing to address local need. 
1st Alliance Community Bank: Progressive Finance
Intent
To provide affordable credit, prevent reliance on high-cost lenders and improve financial resilience.
Implementation
Through recycled loan funds, Progressive Finance issued:
- 177 loans during 2025–26
- Total lending of £360,521
Support included financial guidance and encouragement of savings alongside borrowing.
Impact
- £52,275 collective savings through Credit Union savings accounts
- The loans have resulted in a collective saving of over £131,000 in interest payments for
families
- Bad debt on this year’s lending is under 3%
- Improved credit behaviours and reduced financial stress reported by families
However, 207 applications were declined due to high levels of existing debt, gambling or Buy Now Pay
Later use.
Next Steps
Progressive Finance is piloting alternative support models with third sector partners to respond to
households unable to access credit safely.
82

Page 83

22 
Saltcoats Link Up
Intent
To reduce child poverty and inequality across Saltcoats, the Three Towns and Kilwinning through a
holistic, trauma-informed and person-centred approach, addressing both immediate financial
hardship and longer-term wellbeing, confidence and social connection for children and families.
Implementation
Saltcoats Link Up delivered a wide range of community-based, relational support, working in
partnership with local organisations and using trusted, accessible settings.
Key elements included:
- Family support programmes and 18 community and holiday events to reduce food insecurity
and social isolation
- A pilot Family After-School Group and Parent Wellbeing Group, co-designed with participants
and supported by food provision
- Community giving initiatives, including festive and seasonal support
- Access to affordable food through the Argyle Community Shop which has 338 members
- Practical crisis support of food, fuel vouchers, digital inclusion, uniforms and essential items
- One-to-one advocacy and financial inclusion support, with strong referral pathways to advice,
debt, energy and health services
Impact
Activity supported families to manage the rising cost of living while improving wellbeing and
connection. Reported impacts included:
- Reduced food insecurity and financial stress
- Increased confidence, routine and family wellbeing
- Improved social connection and reduced isolation for parents and children
- Strengthened parental engagement and positive family relationships
- Increased access to services through trusted, relationship-based support
- Community giving initiatives supported hundreds of families and children, significantly
reducing pressure during key periods such as holidays and festive seasons. The Christmas Gift
Giving Tree programme alone supported 772 children from 322 families.
Next Steps
Building on the strong foundations established through Saltcoats Link Up, learning from this work has
reinforced the value of community-led, relational approaches in reducing barriers to support and
engaging families experiencing the greatest disadvantage. This learning is now being actively
embedded into future delivery through the development of Community Link Up, creating a
strengthened and more sustainable model of support. Based in Auchenharvie Academy, this next
phase will continue to build on established partnerships and approaches, including the Fairer Futures
Community Connector model, Whole Family Support development and links with CHES across North
Ayrshire. This progression ensures that the insight, relationships and impact developed through
Saltcoats Link Up continue to shape system-wide approaches and support improved outcomes for
families through Community Link Up.
83

Page 84

23 
KA Leisure
Intent
To reduce the financial barriers faced by children, young people and families in accessing sport and
physical activity, particularly during school holidays, supporting health, wellbeing and social
connection while easing cost-of-living pressures.
Implementation
KA Leisure delivered two complementary initiatives focused on affordable and inclusive access to
leisure services:
- Affordable Memberships for Young People:
Working in partnership with Youth Services, Young Carers Services, Care Experienced Support
Teams and Education, KA Leisure provided free or low-cost leisure memberships to children
and young people under 25. This targeted approach focused on removing cost as a barrier to
participation in physical activity. 
- Free Holiday Swim and Skate Sessions:
During school holiday periods, KA Leisure delivered free swim and skate sessions for children
and young people aged 17 and under, funded through the Community Poverty Equity
Innovation Fund (CPEIF) in partnership with North Ayrshire Council. In 2025–26, the
programme was expanded to include free access for parents and carers, reducing costs for
whole families, and introduced swim and skate sessions for children and young people with
additional support needs (ASN) to ensure activities were accessible and inclusive
Impact
- 192 free or low-cost memberships were provided to children and young people under 25
- Across school holiday periods there were:
1,338 free swim attendances
886 free skate attendances
- ASN-specific sessions were particularly well received, with families reporting: 
improved confidence and comfort participating
opportunities to connect with other families experiencing similar support needs
Together, these initiatives helped reduce the financial pressure on families whilst supporting physical
activity, wellbeing and social inclusion.
Next Steps
In 26-27 we plan to:
- Work more closely with partners to identify and address additional barriers to participation,
recognising that memberships alone may not be sufficient to enable access
- Explore practical supports such as transport, confidence-building and tailored engagement
- Strengthen partnership approaches to measure impact, including outcomes for wellbeing,
participation and sustained engagement over time 
84

Page 85

24 
Energy Smart
Intent
To reduce cost-of-living pressures for children, young people and families by improving household
energy efficiency, increasing income maximisation, and supporting access to practical advice and
measures to reduce fuel poverty and financial stress.
Implementation
Energy Smart delivers a coordinated package of energy-related support focused on households most
affected by rising energy costs, working in partnership across Council services and with trusted
delivery partners. Delivery is aligned with wider child poverty and cost-of-living activity to ensure
support is accessible, targeted and joined-up.
Key elements include:
- Advice and income maximisation
Targeted energy advice is offered to help households better understand and manage energy use, with
support from Home Energy Scotland.  Income is maximised through access to the Council's Energy
Crisis Payments, where up to £500 can be offered to eligible households with the cost of electricity
and gas.  This support is often delivered alongside wider financial inclusion and practical measure
support.
- Practical Energy Efficiency Measures
Households are supported to access practical measures that reduce energy costs, including
insulation, heating improvements and small energy efficiency measures. Delivery is aligned with
programmes such as Area Based Schemes to maximise impact, particularly for low-income families,
mixed-tenure households and those with additional vulnerabilities.
- Targeted Delivery
Energy Smart activity is focused on priority communities, including families with children, ensuring
support is trusted and locally accessible.
Impact
Key impacts include:
- Around £389k provided through Energy Smart crisis payments and £185k provided through
practical measures, helped households manage acute cost‑of‑living pressure
- Improved access to insulation and heating improvements for households in, or at risk of, fuel
poverty, including families living in hard-to-treat and mixed-tenure properties
- Increased uptake of benefits, grants and energy support schemes following targeted advice
and advocacy
- Casework examples include support for families living in flatted blocks, where Energy Smart
has enabled coordinated insulation works to proceed so that low-income owner-occupiers are
not excluded from essential energy efficiency improvements
85

Page 86

25 
- Families supported through Energy Smart report reduced financial stress, improved thermal
comfort in the home, and greater confidence in managing energy bills and engaging with
suppliers
Next Steps
In 2026-27 we plan to:
- Strengthen alignment between Energy Smart and child poverty priorities
- Expand delivery through cross service collaboration, utilising existing programmes which
support children and families
- Increase the variety of support measures offered through the programme 
86

Page 87

26 
Case Study – Auchenharvie Academy
The North Ayrshire Cost of the School Day (COSD) policy was collaboratively created in the previous
reporting period and individual schools were given autonomy on its implementation. Its impact can
be seen in meaningful and deeply embedded practices across our local authority. The team at
Auchenharvie Academy in Stevenston have shared just a snippet of their work and impact in 2025/26. 
Our work around child poverty focusing on the costs associated with the school day at Auchenharvie
Academy has been an evolving process which is now embedded into the fabric of the school, right at
the heart of everything we do. From early involvement with the Child Poverty Action Group for
Scotland (CPAG) and other schools in the authority, we have taken the work of COSD and
implemented it into the everyday workings of the school from classroom/study resources, food for
learning, accessible school trips, school uniform and prom wear. Every aspect of the school day, from
leaving the house, to returning at night is supported by the school to ensure all children and their
families have equal access to supports. Classrooms are ‘poverty proofed’ to ensure there are no
barriers for any young person to learn. If and when a barrier is identified, it is quickly addressed.
A dedicated group of young people act as Cost of the School Day & Equity Ambassadors and are
critical leaders of the work in the school. Our Ambassadors work hard to reduce the stigma
surrounding accessing support. We have found that young people are much more willing to engage
with available supports when offered by their peers as opposed to being offered by staff, and this is
something Auchenharvie has embraced and embedded. The Ambassadors speak at assemblies, run
drop-in sessions, run social media accounts and act as a ‘go between’ young people and staff
responsible for the work. Our Ambassadors have also been involved in writing the Young People’s
Poverty and Education Manifesto, which was shared at the Scottish Parliament in March 2026. 
Our uniform store (‘NA PLUS: New and preloved uniform store’) was initially used infrequently by
pupils and their families, but with the support of our Ambassadors and their work to normalise it’s
use, we now see multiple visits per day for school supplies, one third of all pupils using our prom wear
provision, and approximately 200 families per year utilising our uniform store.
Alongside this work, our school also signposts to community partners, such as Saltcoats Link Up, who
can support families directly to improve their wider circumstances with longevity. This then creates a
link with external supports for the future, ultimately ensuring that once a family makes contact, we
can craft a safety net around them and their needs. We’re proud that our school has become a hub for
the community either supporting first hand or signposting to relevant agencies/charities to support
our children and families. 
87

Page 88

27 
3.2.1 Our Island Communities 
We recognise that families living within our Arran and Cumbrae communities can experience distinct
and often higher costs that can intensify their own experience of child poverty. Transport, fuel and
energy costs, potentially limited access to childcare and services, housing affordability pressures
and constrained local labour markets can all impact financial resilience.
During this reporting year, evidence gathered through the Arran Housing Taskforce Survey reinforced
this picture, highlighting the interaction between housing costs, limited housing supply, employment
constraints and wider cost of living pressures. While incomes on Arran can appear higher on average,
the survey evidenced that affordability challenges, housing insecurity and limited choice remain key
issues for many households, particularly those on lower incomes or in insecure accommodation.
Throughout the life of the Child Poverty Action Plan 2023-2026, this understanding has shaped a more
locally responsive approach to support on the islands. In 2025–26, targeted interventions focused on
helping families manage immediate cost pressures and access trusted advice. This included the
Island Emergency Cost of Living Fund, delivered through Arran Community and Voluntary Services,
providing discreet, locally administered support with essential household costs for residents on Arran
and Cumbrae.
Access to financial services and support has also been strengthened. In 2025, First Alliance
Community Bank recruited an island-based Member Engagement Officer to act as a first point of
contact for the Arran and Cumbrae communities. The post, funded for two years, provides practical,
place-based support by promoting their Progressive Finance pathways, welcoming and supporting
new members, supporting the completion of applications, and connecting individuals to other advice
and support services where needed. This role helps address access barriers, supports financial
inclusion and strengthens local pathways to affordable credit and saving options.
Alongside this, as mentioned above, action to improve childcare availability has remained a priority
due to its importance for parental employment and household income. Targeted recruitment activity
led to a doubling of registered childminders on Arran, including new provision in areas where none
previously existed, reducing a longstanding barrier for island families.
Learning from delivery in Arran and Cumbrae has reinforced the need to treat higher costs, limited
service access and reduced choice as structural system issues, rather than exceptions. This learning
will continue to inform future place-based planning through our joint Children & Families Plan,
ensuring island communities remain visible in decision-making and that responses continue to
reflect the lived experience of families in North Ayrshire’s island communities. 
88

Page 89

28 
3.3 Income from Social Security and Benefits in Kind - Key Activities,
Impact and Next Steps
Alongside mitigating the cost of living, ensuring that families are aware of and able to access the
support they are entitled to is essential in supporting household income, particularly in the context of
rising living costs and financial pressure. This section outlines some of the work we have undertaken
this year to connect families with services.
High level trends over time:
Description
*Locally sourced data 2020 2021 2022 2023 2024 2025
*Speed of processing
Housing Benefit (New
Claims) (days)
8.89 9.45 14.12 21.07 14.37  20.7 
* Speed of processing
Housing Benefit (Change
of Circumstances) (days)
7.59 9.24 14.12 12.41 9.67  16.73 
*Number of Crisis Grants
Paid 3,539 2,460 3,605 3,436 3,368 3,645
*Gross rent arrears (All
tenant as at 31March
each year as a
percentage of rent due for
the reporting year (LGBF)
5.5% 6.6% 7.1% 5.88% 8.03% NYA
*Percentage of new
tenancies to applicants
who were assessed as
homeless sustained for
more than a year
92.48% 86.92% 88.38% 84.02% - NYA
*Speed of processing
Council Tax Reduction
(New Claims) (days)
19.05 25.59 37.8 34.38 22.23 44.56
* Speed of processing
Council Tax Reduction
(Change of
Circumstances) (days)
5.13 5.95 7.62 4.76 4.44 9.04 
These indicators suggest ongoing pressure on household finances, with sustained demand for crisis
support and variation in processing times highlighting the complexity of family circumstances and
reinforcing the importance of accessible, resilient and joined-up financial inclusion services that
support early intervention. Processing times were impacted in 2025 by periodic system downtime. 
89

Page 90

29 
Money Smart
Intent
North Ayrshire’s Health and Social Care Partnership’s Welfare Rights and Debt advice service is
aligned to the Partnership’s priorities in reducing inequalities, preventing crisis and improving
wellbeing. Money Smart plays a key role in delivering these strategic priorities by:
- Maximising household income for individuals and families by ensuring access to all eligible
welfare benefits
- Reducing financial hardship, poverty, and inequality through early intervention and targeted
advice
- Supporting individuals in managing and resolving debt issues, preventing escalation to crisis
situations such as eviction, utility disconnection, or legal enforcement
- Improving financial resilience, confidence, and long-term stability
- Providing inclusive, accessible advice services, particularly for vulnerable or marginalised
groups
Implementation
The service provides a range of support including delivery of specialist welfare rights advice, such as
benefit checks, new benefit applications, mandatory reconsiderations, and appeals representation.
With respect of debt advice services, these include budgeting support, financial capability guidance
and negotiation with creditors.
Impact
The team have achieved an incredible £20m in financial gains for residents of North Ayrshire in 2025-
26.  Through supporting 7560 clients by increasing household income through successful benefit
claims and backdated awards, achieving an average £4,623 gain per client. The service continues to
have a positive impact on individuals by reducing unmanaged or problem debt through structured
repayment plans and debt solutions. In year 2025-26 the total household debt reduction was
£568,202.15. By relieving financial concerns this helps to improve mental health and wellbeing and
prevent crisis situations like homelessness and fuel poverty and increases financial resilience and
confidence in North Ayrshire residents.
Next Steps
In 2026-27:
- Increase capacity to meet rising demand for services due to the continued Cost of living
pressures including energy and food costs as well as an ever-increasing complexity of welfare
policy changes 
- Expand early intervention approaches, identifying financial issues before they reach crisis
point 
- Strengthen partnership working, particularly with health services by further embedding advice
services within mental health and youth services
- Mainstream GP co-location 
- Start accreditation assessment
90

Page 91

30 
Money Smart is critical to North Ayrshire’s preventative approach, delivering significant financial
gains for residents while reducing inequalities and demand on public services. Continued focus will
ensure the service is able to meet increasing demand to maintain high-quality, specialist advice
provision and continue to deliver strong outcomes for individuals and families as well as the wider
community. 
Welfare Rights Officers in Schools
Intent
The Welfare Rights in Schools Project aims to reduce child poverty by ensuring families in North
Ayrshire receive the financial support they are entitled to. By embedding Welfare Rights Officers
(WROs) within school settings, the project provides early, accessible and stigma-free financial
advice, helping to increase household income, prevent financial crises and improve family wellbeing.
Improving financial stability for families delivers direct benefits for children’s health, wellbeing and
educational outcomes.
Implementation
During 2025–26, WROs were embedded across all educational establishments in North Ayrshire.
Schools acted as trusted, familiar environments where parents could access confidential advice
during drop-off, pick-up and school events, including parents’ evenings and wellbeing sessions.
WROs provided holistic welfare rights advice, supported benefit claims, and made referrals to partner
services including employability, energy advice and wider council and third sector support. School
staff, who are well placed to identify early signs of financial hardship, referred families for support,
enabling early intervention before issues escalated.
Impact
The project delivered significant financial and wellbeing outcomes for families during 2025–26:
- £1.5 million in financial gains secured for families
- 260 referrals received
- 240 families achieved positive financial outcomes
Families and schools reported reduced stress, improved wellbeing and increased financial stability,
including better ability to provide food, heating, clothing and school materials. Improved financial
security also contributed to better school attendance and increased parental capacity to engage
positively in children’s lives.
Next Steps
Confirmation of funding for 2026–27 is required to maintain service delivery. Subject to funding
approval, the project aims to pilot more intensive, targeted support in selected schools, allowing for
closer analysis of referral patterns and outcomes and strengthening the project’s impact on reducing
child poverty. 
91

Page 92

31 
Free School Meals
Intent
The expansion of free school meals (FSM) aims to maximise household income by ensuring families
entitled to Scottish Child Payment (SCP) also benefit from associated social security entitlements. By
reducing food costs and preventing meal debt, the policy supports household financial stability,
ensures children can access nutritious meals, and mitigates the cost of the school day.
Implementation
During 2025–26, North Ayrshire continued the roll-out of FSM to Primary 6 and 7 pupils in receipt of
SCP. The expansion was promoted through social media, press releases and targeted engagement
with schools and partners including the Money Smart Team and Welfare Rights Officers. From July
2025, data identifying households in receipt of SCP enabled a targeted approach, with full
implementation beginning in August 2025. At the point of expansion, any accrued meal debt for newly
eligible pupils was written off at cost to the service.
Universal Free School Meals (UFSM) continue for all Primary 1–5 pupils, while Primary 6 and 7 pupils
are eligible if their family receives SCP. North Ayrshire maintains a no-refusal policy, ensuring that no
child is denied a meal, regardless of their account balance.
In addition, North Ayrshire participated in the Scottish Government’s Test of Change pilot, expanding
FSM to S1–S3 pupils in receipt of SCP. This was implemented across all nine secondary schools from
August 2025, alongside work with education colleagues to encourage uptake and identify barriers to
access.
Impact
As of April 2026:
- 84% of primary school pupils are eligible for FSM
- Uptake of FSM for Primary 6 and 7 pupils eligible through SCP is 60%, while uptake for
Universal Free School Meals (Primary 1–5) is 79% (compared with 42% uptake for paid meals
in primary schools)
Next Steps
Uptake of FSM for Primary 6 and 7 pupils in receipt of SCP, and S1–S3 pupils participating in the Test
of Change, will continue to be closely monitored throughout the 2025–26 academic year. Learning
from local implementation and national evaluation work, including analysis by Ipsos, will inform
understanding of barriers to uptake, particularly in secondary settings. This evidence will support
future decisions on expansion, communications and policy design to ensure FSM entitlements
effectively maximise income and reduce financial pressure for families. 
Pupil Equity Funding and Winter Warmers
Intent
Closing the gap in achievement between North Ayrshire’s least and most disadvantaged young
people is one of Education’s five main priorities, focused on helping children affected by poverty
92

Page 93

32 
reach their potential. Schools receive Pupil Equity Funding (PEF) every year so head teachers can
support pupils where help is needed most. Head teachers can choose the best ways to use this
money for their learners. The Winter Warmer Breakfast initiative has been running since December
2022 and offers a free breakfast to all secondary school pupils over some of the winter months.  
Implementation
Besides school funding, the Council also provides extra support through central programmes. This
includes 21 Excellence and Equity Leads who work in early years settings with the highest levels of
deprivation, offering early support to children and families. 
Impact 
- The PEF spend across 2025-26 included £59,983 across our Additional Support Needs school,
then Primary Schools at £2,999,048 and Secondary Schools at £1,015,373. 
- Every school day over the Winter 2025-26, all secondary schools offered a free breakfast to
pupils every morning which includes either a hot roll or two of the following: fruit pot,
croissant, cheese scone, pancake or toast. Many young people leave home in the morning
without breakfast and this offering has been well received since its inception, helping sustain
learners throughout their morning lessons and help alleviate hidden hunger. An average of over
1,000 breakfast items were given out every day.
Next Steps
Ongoing monitoring will continue as opportunities increase to bring together these aspects and the
fuller range of support that Education offers through schools for families in reducing child poverty.
This will support the wider analysis alongside measures such as Free School Meals and Welfare
Rights Officers in Schools, as we improve our communication with families in a dignified way of the
support available. 
Health Visitor Financial Inclusion Pathways
Intent
The Health Visiting Financial Inclusion Pathway aims to maximise family income and reduce child
poverty by ensuring parents and carers of children under five are supported to access benefits,
financial advice and wider practical support at the earliest opportunity. As the only universal service
engaging with every family with a child under five in North Ayrshire, health visiting plays a pivotal role
in whole family support and early intervention, in line with the National Health Visiting Action Plan.
Implementation
As part of the Universal Health Visiting Pathway, health visitors routinely assess financial wellbeing
and, where appropriate, connect families to a range of financial inclusion and support services.
Health visitors work alongside families as named persons, offering trusted, relationship-based
support and making timely referrals to:
- Money Smart   
- We Work for Families  
- Lemon Aid
93

Page 94

33 
The service also continues to support families to:
- Access eligible funded 2-year-old ELC placements, working closely with education colleagues
to improve uptake
- Use the Infant Food Insecurity Pathway, including emergency provision of infant formula when
required
- Access clothing and essential household items through community organisations such as
Hillhouse, Garnock Valley Helping Hands and Beith Trust Baby Bundles
In addition, the Health Visiting Service coordinates an annual Christmas appeal, ensuring children in
families experiencing financial hardship receive gifts during the festive period.
Impact
- 43 families were supported through the financial inclusion pathway 
- 2 families supported by Lemon Aid
- 17 families supported by Money Smart
- 24 families supported by We Work for Families
This support has helped families stabilise finances, access entitlements and reduce immediate
material hardship. Wider practical support, including access to clothing, equipment and food
provision, reduced pressure on household budgets and supported child wellbeing. The 2025
Christmas appeal supported over 100 children, helping mitigate seasonal financial pressures.
Next Steps
The Health Visiting Service will continue to embed financial inclusion conversations within universal
contacts, strengthen referral pathways and work closely with partners to improve uptake of financial
entitlements, including funded early learning and childcare.
Nationally, the introduction of the new Child Health System will support improved reporting on child
poverty and financial inclusion through enhanced Child Health Surveillance forms, aligned to key
Health Visitor reviews. This will strengthen identification of financial vulnerability, improve
consistency of data collection and support more robust evaluation of impact over time. 
To conclude:
Income from social security remains a critical lever in reducing child poverty. However, the challenge
locally is less about the availability of provision and more about whether families are able to access
their full entitlements.
North Ayrshire partners have acknowledged the increasing emphasis on system-level enablers of
access. This includes reducing complexity, stigma and fragmentation across services, and
embedding social security awareness and support within trusted, relationship-based settings.
This approach aligns closely with wider systems change activity, including Whole Family Support and
the Fairer Futures Partnership, recognising that families are more likely to seek and sustain access to
financial support when it is offered as part of holistic, dignified and person-centred support rather
than through isolated, transactional processes. The following section highlights some of the
transformational work we are undertaking in recognition of these findings.
94

Page 95

34 
3.4 Systems Change
Alongside targeted activity addressing the three drivers of child poverty, North Ayrshire has
increasingly focused on systems change; meaningfully reshaping how our services, funding and
partnerships operate to deliver more coherent, preventative and person-centred support for children
and families.
During 2025–26, this approach was strengthened through participation in a number of national
programmes that support long-term, sustainable change in addition to short-term mitigation. 
This section focuses on system foundations and early learning rather than population-level
outcomes. Impact measurement will follow as delivery models mature. 
Whole Family Wellbeing Fund
The Whole Family Wellbeing Fund (WFWF), led locally through the Health and Social Care
Partnership, has supported North Ayrshire’s shift towards earlier, more preventative and whole-family
approaches to reducing poverty and improving outcomes for children and families. Aligned with
national priorities, including The Promise, WFWF investment focuses on addressing the underlying
factors that contribute to family hardship, such as poor mental health, social isolation and barriers to
accessing services, helping to reduce the need for crisis intervention. 
WFWF-funded activity complements wider child poverty action by strengthening relationship-based,
person-centred support that improves family resilience and stability. By supporting families to build
confidence, establish routines and connect with services, these interventions create stronger
foundations for accessing income, employment and wider support. The following case studies
illustrate how WFWF investment is supporting families through early intervention, coordinated
partnership working and community-based support. 
Case Study – Family Centred Wellbeing Service
The Family Centred Wellbeing Service (FCWS) is a whole-family support model that provides
intensive, relationship-based and trauma-informed assistance to families, aligning with Whole Family
Support principles of early intervention, dignity and coordinated, multi-agency working.
A family of three was referred to the Family Centred Wellbeing Service by a primary school due to
concerns around hygiene, routines and a child’s wellbeing. Both parents were committed to
improving their circumstances but faced significant barriers, including learning difficulties, trauma,
limited experience of managing daily routines and finances, and historic negative experiences with
professional services, which had contributed to low confidence and disengagement.
Through consistent, relationship-based and trauma-informed support, practitioners provided
intensive, practical assistance with home routines, hygiene, nutrition and organisation, alongside
advocacy with housing, health and welfare services. A coordinated multi-agency approach ensured
that support was aligned across school, health and home environments, with communication tailored
to meet the parents’ learning needs.
Over time, this resulted in sustained and meaningful improvements. The child’s health, hygiene,
nutrition and engagement in school improved significantly, while both parents reported increased
95

Page 96

35 
confidence, improved mental wellbeing and greater financial stability. The family now maintain a safe,
organised home environment and have established consistent routines, strengthening family
relationships and long-term resilience.
This case highlights how early, trauma-informed, whole-family support can address both the visible
symptoms of poverty and the underlying structural and personal barriers, including trauma, learning
needs and system mistrust, preventing escalation and enabling long-term, sustainable change. 
Case Study – Baby Bundles
Baby Bundles is a community-based, whole-family support service that provides early, low-barrier
practical and emotional support to families with young children, aligning with Whole Family Support
principles of accessibility, dignity and prevention. The service accepts referrals from partners and
offers a dignified entry point into wider financial inclusion, advice and wellbeing support. 
A single parent with four children under five, including a newborn, was recently referred to the service
due to financial hardship, isolation and poor mental health following the birth of her baby. With no
local support network, she was at risk of reaching crisis. Through its low-barrier, community-led
approach, Baby Bundles provided essential items including clothing, sleeping equipment and baby
supplies, alongside informal, ongoing support. The accessible, trusted environment enabled the
parent to engage at her own pace, build confidence gradually and access wider services, including
Citizens Advice, to stabilise her financial situation. 
The intervention reduced immediate financial pressure and improved stability within the home. The
parent reported improved mental wellbeing, reduced stress and increased confidence, alongside a
growing sense of connection to her local community. Early engagement also supported access to
wider networks and activities, reducing isolation. 
The case demonstrates the value of early, preventative, community-led support in addressing
immediate material need while also strengthening confidence, connection and resilience, helping
families to stabilise before crisis point and creating the foundations for longer-term improvement. 
Whole Family Support: Early Adopter 
During 2025–26, North Ayrshire became an early adopter of the Scottish Government’s Whole Family
Support approach, reflecting a clear commitment to transforming how children and families
experience support across the system.
Whole Family Support recognises that families facing poverty often experience interconnected
challenges spanning income, health, wellbeing, childcare, housing and education. Becoming an early
adopter reinforces North Ayrshire’s intention to move away from fragmented, service-led responses
towards coherent, relational and preventative ways of working that place families at the centre.
At this early stage, the focus has been on aligning values and principles across partners rather than
introducing new delivery models. This includes a shared commitment to dignity, trust, early
intervention, No Wrong Door approaches and recognising families as experts in their own lives.
Whole Family Support provides an important foundation for wider systems-change activity, aligning
closely with work underway through CHES, the Fairer Futures Partnership and Community Wealth
96

Page 97

36 
Building. It also supports North Ayrshire’s transition into the joint Children and Families Plan, helping
ensure that action on child poverty is embedded across planning, commissioning and service design. 
Collaboration for Health Equity Scotland (CHES)
Good Start, Good Jobs, Good Health
Our Approach
North Ayrshire is one of three local authority areas participating in the Collaboration for Health Equity
Scotland (CHES) programme. CHES aims to improve health outcomes and reduce health inequalities
by strengthening action on the social determinants of health through a whole-systems, place-based
approach.
Local delivery is structured around three interconnected workstreams:
Good Start: focused on children aged 0–5 and their families
Good Jobs: promoting fair employment and access to good work
Good Health: strengthening prevention and reducing the impact of ill health
These workstreams reflect the strong alignment between health inequalities and child poverty,
recognising that sustainable progress requires integrated action across employment, income, early
years, prevention and family support.
Governance and Development
The CHES programme was launched locally in February 2025 and is driven by a dedicated CHES
Steering Group, involving a range of North Ayrshire partners alongside the Institute of Health Equity
and Public Health Scotland. The programme is underpinned by guiding principles of being
data-informed, place-based and community-engaged.
During 2025–26, extensive analytical work was undertaken to map the relationship between
deprivation, health outcomes and opportunities for improvement across localities and
neighbourhoods. This analysis informed the identification of geographic areas of focus and the
prioritisation of the three Good Start, Good Jobs and Good Health workstreams.
CHES has adopted the double diamond model of service design, with workstreams completing the
‘discover’ phase and now progressing into the design and deliver phases. This has supported deeper
understanding of system strengths, gaps, enablers and barriers, while allowing space for an emergent
approach responsive to local context.
Emerging Learning
While CHES is at an early stage, a key benefit during this phase has been increased system
awareness and mobilisation around health inequalities.
As a result of CHES activity, local system leaders have committed to:
- simplifying and promoting shared language, including the development of the concept ‘Good
North Ayrshire – Good Start, Good Jobs, Good Health’
97

Page 98

37 
- exploring the feasibility of a hub-based model, with virtual teams aligned to the three CHES
principles, informed by the Scottish Prevention Hub
- mapping the current (‘as is’) system of support, resources and assets in focused places to
inform development of alternative (‘to be’) models
- removing organisational and system barriers to enable a No Wrong Door approach for
households experiencing multiple vulnerabilities
- learning from and embedding effective key-worker approaches where these are shown to
improve outcomes
This work has contributed to a stronger shared understanding of how existing systems can be better
aligned to deliver more holistic, joined-up and preventative support for families experiencing poverty
and poor health outcomes.
Next Steps
Capturing learning from CHES is recognised as essential. An evaluation framework is currently in
development and will be implemented as the workstreams move fully into the delivery phase.
During 2026–27, CHES will:
- progress testing of whole-system approaches within the Good Start, Good Jobs and Good
Health themes in identified geographic areas
- continue to strengthen integration across partners and services
- develop evidence on what supports improved outcomes for children and families experiencing
the poorest health and socioeconomic outcomes 
Fairer Futures Partnership
Community-led systems change through lived experience
Intent
The Fairer Futures Partnership supports North Ayrshire to test new, community-led approaches to
reducing child poverty by directly addressing barriers that prevent families from accessing support.
Central to this work is the recognition that while services exist, access, not provision, is often the
primary challenge.
Fairer Futures places lived experience and community leadership at the heart of system design,
reflecting a shift from service-led models towards relationship-based, trauma-informed early
intervention.
Co-design
The programme began with small, flexible grants awarded to local third sector organisations rooted in
their communities. Funding decisions were made through a multi-agency panel comprising:
- the local authority
- the Third Sector Interface
- community members with lived experience
98

Page 99

38 
Successful organisations used existing community spaces and trusted local events as the foundation
for engagement, ensuring families felt safe, respected and able to participate on their own terms.
What Communities Told Us
Engagement focused on understanding what children and families need to thrive locally, prioritising:
- familiar, informal settings
- relationship-based conversations
- the voices of people with lived experience
This listening phase generated a strong, community-informed understanding of local priorities and
directly informed the design of North Ayrshire’s Fairer Futures test of change.
A service-mapping exercise, shaped by community feedback, identified that:
- there were a large number of services in the area that align with the needs expressed by
families and communities
- the core issue is difficulty accessing services, rather than the absence of provision
Consistently identified barriers included:
- lack of awareness, visibility or capacity of services
- transport and geographic isolation
- stigma and fear of judgement
- low confidence and self-efficacy
A clear learning emerged: signposting alone is insufficient. Families need trusted, relational support
to navigate services and sustain engagement.
Test of Change: The Fairer Futures Community Connector Model
In response, a proposal was approved through the Community Poverty Equity Innovation Fund
(CPEIF) to pilot a new model based on community-based connector roles embedded within trusted
third sector organisations.
The Community Connector roles are designed to:
- attend tailored community and family events
- build trusting relationships with families
- develop deep knowledge of local services and supports
- provide warm handovers rather than referrals, reducing drop-off and disengagement
This approach brings services to families, rather than expecting families to navigate complex and
fragmented systems.
The model is currently being developed in three of our communities identified as being most likely to
benefit from support.
Emerging Learning
The Fairer Futures Partnership is supporting a shift towards:
- stigma-free, trauma-informed support
- community-led, person-centred pathways
99

Page 100

39 
- earlier intervention driven by relationships rather than thresholds
While still in its early stages, this work is already influencing how partners think about access, trust
and engagement, and aligns closely with North Ayrshire’s ambitions for Whole Family Support, No
Wrong Door approaches, and wider systems change.
Next Steps
During 2026–27, the Community Connector model will move further into delivery, with learning
captured to inform:
- future service design
- commissioning and funding decisions
- wider replication across localities where impact is demonstrated
Evaluation will focus on understanding how relationship-based models improve access, engagement
and outcomes for families experiencing poverty, particularly those least likely to engage with
traditional services. 
Community Wealth Building
Community Wealth Building (CWB) is a core component of North Ayrshire’s approach to reducing and
preventing child poverty at source. Rather than focusing solely on individual employability, CWB
seeks to reshape the local economy so that more families can access fair, secure and meaningful
work, increasing household income and long-term financial stability.
Through its role as an anchor institution, North Ayrshire Council, alongside public sector and third
sector partners, has used CWB to influence employment practices, procurement, skills development
and supply chains. This approach supports a shift from short-term intervention towards sustainable
economic inclusion for parents experiencing poverty.
CWB aligns closely with Whole Family Support and No Wrong Door approaches, ensuring that system
design reflects the realities of family life, childcare responsibilities and structural barriers to work
Delivery through the Fair Employment pillar of the CWB Strategy demonstrates how structural change
translates into tangible opportunities for families. 
Housing as a System Enabler for Reducing Child Poverty
Intent
Safe, secure and affordable housing is a fundamental enabler of positive outcomes for children and
families. In North Ayrshire, housing plays a critical systems-change role in preventing poverty-related
harm, reducing instability and supporting whole-family wellbeing, recognising that housing insecurity
both contributes to and compounds child poverty.
Rather than focusing solely on crisis response, housing activity has increasingly been shaped around
prevention, early intervention and place-based planning, aligning with wider ambitions for Whole
Family Support and No Wrong Door approaches.
100

Page 101

40 
Place-based
During 2025–26, Housing Services progressed work to strengthen Local Housing Plans, informed by
locality-level data, deprivation profiling and partnership engagement. These plans support a more
targeted understanding of need at neighbourhood level and provide a mechanism for aligning
housing, health, employability and community planning priorities.
This place-based approach aligns with wider systems-change activity, including CHES and the Fairer
Futures Partnership, recognising housing stability as a key social determinant of health, wellbeing
and financial resilience for families.
Access and Prevention
North Ayrshire has continued to prepare for implementation of the Housing (Scotland) Act 2025,
supporting a shift towards stronger prevention duties, enhanced tenant protections and earlier
intervention. This legislative change reinforces the role of housing as part of a protective system for
families at risk of poverty, insecurity and homelessness.
Alongside this, work to refresh the Housing Allocation Policy (2025–30) reflects a commitment to
fairness, transparency and accessibility. The emphasis is on reducing complexity, improving
navigation and ensuring households experience housing services as human, supportive and
joined-up, rather than transactional or fragmented.
Preparation of a new Homeless Prevention Strategy is underway, to set out a clear, ambitious and co-
ordinated approach to preventing homelessness earlier, reducing the harm caused when
homelessness does occur, and supporting people to achieve lasting stability so homelessness does
not recur. The Strategy will recognise that more targeting is required for households with children,
care experienced young people, and to develop mediation work with families, as well as reduce the
number of children in temporary accommodation
Housing activity continues to play a key role in increasing supply and reducing financial pressure on
households. Reducing the number of empty homes remains a priority, with 432 properties brought
back into use as at 31 March 2026. This supports increased availability of housing within local
communities, helping to reduce pressure on the system and contributing to the prevention of
homelessness and housing instability, both of which are closely associated with child poverty.
Investment in existing council housing also contributes directly to reducing the cost of living for
families. Ongoing improvement works, including external wall insulation and solar panels, are
supporting tenants to reduce energy costs and mitigate the impact of fuel poverty. This is particularly
significant for low-income households, where energy costs represent a disproportionate financial
burden.
Partnership Working
Housing Services have contributed to cross-sector partnership work to address housing pressures,
including participation in local homelessness prevention activity, sustainment forums and
collaborative planning with Registered Social Landlords and third sector partners. This reflects a
shared recognition that housing outcomes cannot be improved in isolation and must be aligned with
wider family support, financial inclusion and health initiatives.
101

Page 102

41 
At this stage, the focus remains on system alignment and foundation-building, rather than measuring
direct impact on income or poverty outcomes. However, this work establishes the conditions for
more effective, integrated support for families experiencing or at risk of poverty.
Next Steps
As North Ayrshire transitions into the joint Children and Families Plan, housing will continue to play a
central enabling role in supporting family stability, prevention and equity. Ongoing systems
development will ensure housing policy and practice are fully aligned with child poverty objectives
and contribute to sustainable, long-term change for children and families. 
Young Carers
North Ayrshire is taking a whole-system, prevention-focused approach to embedding early
identification and consistent support for Young Carers across education and partner services. Young
carers are more likely to experience financial hardship, reduced participation in education and
increased risk of poorer long-term outcomes, making early support critical within wider child poverty
activity.
Key developments during 2025–26 include:
- 15 schools have signed the Young Carers Covenant, embedding recognition and support into
school culture, supported by a shared Education Information Pack
- Increased uptake of Young Carer Statements reflects stronger referral pathways and improved
staff confidence, supported by targeted training
- A jointly agreed, annually reviewed framework between schools and the Carers Gateway
ensures aligned roles, shared priorities and coordinated delivery
- Schools deliver a core offer including group work, one-to-one support, awareness-raising and
transition support tailored to local need
The approach shifts practice upstream, embedding sustainable system change to ensure young
carers are identified earlier and supported consistently. By improving wellbeing, engagement with
education and access to support, this contributes to reducing longer-term poverty risk and supports
improved life chances for young carers and their families. 
To conclude:
Taken together, systems-change activity across programmes such as the Fairer Futures Partnership,
Collaboration for Health Equity Scotland, Whole Family Wellbeing Fund and Whole Family Support
demonstrates a clear shift towards earlier, more preventative and whole-system approaches.
Looking ahead, this direction of travel is being further strengthened through the development of more
joined-up, accessible systems of support. Work is underway to embed approaches such as No Wrong
Door and Single Shared Assessment through our Accessing our Services programme. The newly
assembled project board brings together key partners to reduce complexity and improve coordination
across financial inclusion, advice and wider support services. Whilst this work is at an early stage, it
102

Page 103

42 
reflects a shared commitment to ensuring families can access the right support at the right time,
without experiencing barriers, duplication or gaps in provision. As this approach develops, it will
support a more responsive, coordinated system that strengthens income maximisation, reduces the
risk of unmet need and contributes to longer-term efforts to reduce child poverty. 
103

Page 104

43 
4. Conclusion  
This report brings to a close our current Child Poverty Action Plan 2023 - 2026. Over its lifespan,
partners across North Ayrshire have worked collectively to strengthen how we respond to child
poverty, laying important foundations for a more connected approach that supports families earlier,
more consistently and with greater dignity.
Across the duration of the plan, significant progress has been made in addressing the three key
drivers of child poverty. Activity to maximise household income through employment and social
security has expanded and strengthened, with parental employability support, welfare rights advice
and financial inclusion services delivering sustained financial gains for families. Action to reduce the
cost of living has focused on practical support for families with food, transport, education, childcare
and leisure at its centre, helping to ease financial pressure while challenging stigma and improving
access to everyday opportunities for children and young people.
Crucially, progress under this plan has not been limited to individual programmes or short-term
interventions. There has been a meaningful shift in how support is designed and delivered. Whole
Family Support and No Wrong Door principles are increasingly embedded across services, enabling
families to access help more easily and reducing duplication. Child poverty is now more firmly
understood as a shared, system-wide responsibility across Community Planning, supported by
stronger governance, improved use of data, and growing engagement with people who have lived
experience of poverty. 
This final progress report reflects both the continued scale of challenge locally and the foundations
that have been established to strengthen our response. It evidences a maturing approach that
combines immediate mitigation with sustainable, long-term prevention, recognises the importance of
place and priority family groups, and prioritises dignity, access and early intervention. 
This report focuses on the drivers of child poverty, though sits in alignment with a range of related
strategies and partnership plans, including the Children’s Services Plan and Whole Family Wellbeing
Fund reporting, which together provide a more holistic picture of activity to support children and
families across North Ayrshire. 
As our standalone Child Poverty Action Plan comes to an end, the focus now turns to the next phase
of work. From 2026 onwards, action to prevent and reduce child poverty will be fully embedded within
our joint Children and Families Plan, alongside children’s rights, children’s services, wellbeing and
whole family support priorities. This integrated approach will strengthen accountability, improve
alignment of resources, and support a clearer focus on outcomes for children and families, in
alignment with Scottish Government’s Bringing Hope, Building Futures: Tackling Child Poverty
Delivery Plan 2026-31.
While child poverty remains a complex and long-term challenge, the progress made during the life of
this plan provides a strong platform for the next stage. By continuing to work collaboratively, listen to
communities, and build on the system changes already underway, North Ayrshire is better placed to
deliver sustained improvements for children and families and to support a future that is fairer for all.
104

Page 105

44 
5. Appendices
5.1  North Ayrshire Child Poverty Action Plan 2023 to 2026: Key Actions 
105

Page 106

106

Page 107

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Children’s Services Performance Report 2025/26 
Purpose:  To seek approval for: 
a) The North Ayrshire Children’s Services Plan Performance
Report 2025/26 
Recommendation:  That Cabinet: 
a) Approves the North Ayrshire Children’s Services Plan
Performance Report 2024/26
b) Notes the update in relation to the new Children and Families Plan
2026-2029 
1. Executive Summary
1.1 1.1
1.1 Every Local Authority and relevant Health Board are required to jointly prepare a
Children's Services Plan for the area of the local authority for each three-year period.
Plans are developed collaboratively with other members of the Community Planning
Partnership (CPP), as well as with children, young people and their families at various
stages of the development and review of the Plan. We published our current Children’s
Services Plan 2023-26 in June 2023. 
1.2 Our North Ayrshire Children’s Services Plan 2023-26 is part of a suite of child focussed
plans which outline how we are actively supporting the wellbeing and wellness of our
children and young people, as well as promoting and advocating for the rights of our
children and young people. 
1.3 This paper presents the North Ayrshire Children’s Services Plan Performance Report
2025/26 and has been prepared in collaboration with the Children’s Services Strategic
Partnership (CSSP) which consists of representatives from our Community Planning
Partners.   We have a duty under the Children and Young People (Scotland) Act 2014
to produce a Children’s Services Plan Performance report at the end of each year.  The
2025/26 Performance Report is the final report associated with this plan cycle and
closes off the current Children’s Services Plan. 
Agenda Item 9
107

Page 108

1.4 Our Children’s Services Plan Performance Report 2025/26 highlights some of the key
achievements and areas of work which impact on babies, infants, children, young
people and their families.   
1.5 The Children’s Services Strategic Partnership also monitors the Whole Family
Wellbeing Fund. The Whole Family Wellbeing Fund is a £500 million investment over
the life of the Scottish Parliament (2022 to 2026). 
1.6 Appendix 3 of the Children’s Services Performance Report provides a summary of
progress to date including updates on the previously agreed proposals and new
developments, as well as the current funding position.   
1.7 The Children’s Services Strategic Partnership agreed that a new style of Children and
Families Plan for 2026 to 2029 would be developed to set out our collective strategic
responsibility to promote the wellbeing, rights, and outcomes of babies, infants, children
and young people and their families in our area. This responsibility is underpinned by
three key statutory duties, including: 
• Children’s Services Planning: Every local authority and its Health Board must
jointly prepare a Children’s Services Plan for each three-year period. 
• Child Poverty Reporting: The local authority and Health Board must jointly
produce an annual Local Child Poverty Action Report. 
• Children’s Rights Compliance: Local authorities and Health Boards, as listed
public authorities, must act in a way that is compatible with the UN Convention
on the Rights of the Child (UNCRC) and embed children’s rights in their decision-
making and service delivery. 
1.8 Recognising the links across these areas of the children’s services plans and reports,
we have aligned our planning and reporting, which will be supported by a shared set of
child and family wellbeing actions and indicators. This streamlines processes,
strengthens accountability, and will enable more effective targeting of resources to
improve outcomes for babies, infants, children, young people, and families. 
1.9 This work sits within our wider ambitions of strengthening whole family support. We are
one of the Scottish Government’s ‘early adopter’ authorities, with that programme
established to address the twin barriers of: i) policy complexity and overlap, and ii)
funding and reporting approaches. 
2. Background 
Children’s Services Plan Performance Report 2025/26 
2.1 Part 3 of the Children and Young People (Scotland) Act 2014 seeks to improve
outcomes for all children and young people in Scotland by ensuring that local planning
and delivery of services is integrated, focused on securing quality and value through
preventative approaches, and dedicated to safeguarding, supporting and promoting
child wellbeing. It aims to ensure that any action to meet need is taken at the earliest
appropriate time and that, where appropriate, this is taken to prevent need arising. The
aims are about creating and maintaining a local environment which facilitates Getting it
Right for Every Child Practice (GIRFEC) for individual children and young people.
108

Page 109

2.2 Section 13 (1) of the Act requires that as soon as practicable after the end of each
one-year period, a local authority and the relevant health board must publish (in such
manner as they consider appropriate) a report on the extent to which: 
a. children’s and related services have, in that one-year period, been provided in
accordance with the Children’s Services Plan; and
b. that the provision of services has achieved –
i. the aims of children’s services planning (section 9(2)), and
ii. such outcomes in relation to the wellbeing of children in the area as the
Scottish Ministers may by order prescribe. 
2.3 This is our final performance report relating to our 2023-26 Children’s Services Plan
which focusses on our vision 'For all our children and young people to have the
best start in life and for North Ayrshire to be the best place in Scotland to grow
up'. The Performance Report 2025/26 has been structured in line with our five
priorities set out in the Plan. These are – 
1. The rights of children and young people are promoted and protected.
2. Acting early to improve what happens next.
3.  Making Things Fairer
4.  Promoting good mental health and wellbeing
5.  Inspiring children and young people to be active 
2.4 A set of actions were identified to be delivered by CPP partners. Updates on the
progress of the actions has been included in Appendix 1 of the report. We have
established a set of indicators to measure progress, as attached in Appendix 2 of the
report.   
2.5 A summary version of the report will be produced in collaboration with young people to
ensure it is fully accessible and engaging for our young people. 
2.6 Some of the key highlights from the 2025/26 Performance Report include: 
• All North Ayrshire schools take part in the UNICEF Rights Respecting Schools
Award (RRSA) programme, showing a strong commitment to children’s rights
• 15 local primary and secondary schools have now signed up to the Young
Carers Covenant, ensuring that young carer awareness and tailored support
are embedded into school culture.
• From 1 July 2025, the National Childbirth Trust began providing postnatal
breastfeeding support for women discharged from Ayrshire Maternity Unit who
were breastfeeding. Between July and March, 1,331 women accessed this
support, with around half exclusively breastfeeding at 6–8 weeks.
• 89 practitioners are now trained in the Building Positive Relationships
programme, embedding a preventative, trauma-informed approach that
strengthens parental regulation, relationships and resilience while reducing
reliance on crisis intervention. 
• 12 local projects and services received a share of the £1.19 million Whole Family
Wellbeing Fund investment in North Ayrshire, to support the delivery of positive
outcomes for children, young people and families across North Ayrshire. 
• The Duke of Edinburgh’s Award provided a strong wellbeing and achievement
pathway, engaging over 1,000 young people and supporting progression through
Bronze, Silver and Gold levels.
109

Page 110

• 9,781 young people participated in sport and physical activity sessions through
Active Schools. 
2.7  The Children’s Services Strategic Partnership also monitors the Whole Family
Wellbeing Fund. The Whole Family Wellbeing Fund is a £500 million investment over
the life of the Scottish Parliament (2022 to 2026). 
Children and Families Plan 2026 to 2029 
2.8 Our new joint approach in our Children and Families Plan 2026-29 was approved by
Cabinet in January 2026, where it was agreed that the joint responsibilities for planning
and reporting could be brought together into one plan, including: 
• Children’s Services Planning (Part 3 of Children and Young People (Scotland)
Act 2014). The legislation sets out a requirement to develop and publish a
Children’s Services Plan every three years, reporting annually on its progress.
These plans describe how partners will work together and with local
communities, to plan and deliver the right types of services and support so these
result in improved life experiences and outcomes for the children and families
living in that area. 
• Child Poverty (Scotland) Act 2017. This legislation sets out a requirement to
develop and publish an annual report to: describe measures taken and planned
to meet 2030 Scottish Government child poverty targets; include income
maximisation supports, advice and financial assistance; and highlight tailored
actions for families facing additional challenges due to protected characteristics.
• UNCRC Incorporation (Scotland) Act 2024. This legislation sets out a
requirement to develop and publish report on actions taken to comply with
UNCRC and outline future improvement plans. This supports the integration of
children’s human rights into planning, communications, and decision-making. 
2.9 Combining these planning approaches is in line with the Scottish Government’s Whole
Family Support (WFS) project, where we are one of seven ‘early adopter’ local
authorities. The Whole Family Support approach recognises that reporting complexity
and overlap acts as a barrier to local authorities and aims to address this by increasing
permissions and reducing reporting and bureaucracy burdens. 
2.10 The Children and Families Plan 2026-2029 is in an advanced phase of development
with the Children’s Services Strategic Partnership and will be a high level, strategic
plan, designed to bring together the impact of our collective efforts on child and family
wellbeing. This intends to shift traditionally siloed data practices to reveal an
interconnected picture of outcomes. With a shared and consistent evidence base, our
strategic planning and decision making will be more robust, enabling us to target
resources to where they will have the greatest impact. 
2.11 The process of strengthening alignment across governance, planning and service
provision is complex and multi-faceted. The Scottish Government’s Whole Family
Support approach is underway but is operating on a multi-phase basis with real-time
learning integrated into the process. Similarly, we are viewing our own local reform as
incremental. The opportunity to align these areas now as a result of natural policy
cycles is timely. Our overarching goal remains to further strengthen our capacity to
deliver integrated and holistic support to those residents who require it.
110

Page 111

2.12 It is proposed that the new Children and Families Plan 2026-29 will be presented to
Cabinet and to IJB in September for formal approval. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a) Approves the North Ayrshire Children’s Services Plan Performance Report 2025/26;
b) Agrees that the North Ayrshire Children’s Services Plan Performance Report
2025/26 can be submitted to the Scottish Government;
c) Notes that child friendly versions of these reports and Plan will be published as soon
as possible, and;
d) Notes the progress relating to the development of the new Children and Families
Plan 2026-2029. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications for North Ayrshire Council contained within the
current report. 
Human Resources 
4.2 There are no HR implications for North Ayrshire Council contained within the current
report. 
Legal 
4.3 We have a duty under the Children and Young People (Scotland) Act 2014 to
produce a Children’s Services Plan Performance report every year detailing the
activities undertaken in relation to Children’s Services. 
We have a duty under Children’s Services Planning (Part 3 of Children and Young
People (Scotland) Act 2014). The legislation sets out a requirement to develop and
publish a Children’s Services Plan every three years, reporting annually on its
progress. These plans describe how partners will work together and with local
communities, to plan and deliver the right types of services and support so these
result in improved life experiences and outcomes for the children and families living
in that area. 
Equality/Socio-economic 
4.4 Recognising and advocating the rights of our children and young people directly
contributes to ensuring equality and equity of opportunity in North Ayrshire.   
Climate Change and Carbon 
4.5 There are no Climate Change and Carbon implications. 
111

Page 112

Key Priorities 
4.6 This report directly supports our Council’s vision of creating ‘a North Ayrshire that is Fair
for All’ and our mission of ‘Working together to improve the lives our people in North
Ayrshire’. It demonstrates how we are contributing all of our priorities ‘Wellbeing’,
‘Communities and Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’ in
ensuring children’s rights are embedded throughout our services as well as reducing
inequality and improving outcomes. 
This report directly supports the Health and Social Care Partnership Strategic Plan and
vision “To empower people in North Ayrshire to live safe, healthy and active lives with
fair and equal access to sustainable health and care services.” 
This report directly supports the North Ayrshire Community Planning Partnership Plan
and three key themes of ‘Wellbeing’, ‘Work’ and ‘World’. 
Community Wealth Building 
4.7 There are no Community Wealth Building implications for North Ayrshire Council
contained within the current report. 
Islands Communities Impact Assessment (ICIA) 
4.8 None.   
United Nations Rights of the Child (UNCRC) 
4.9 The joint plan explicitly demonstrates our commitment to Children’s Rights and our 
continued work to ensure children’s rights are being met.   
Consumer Duty 
4.10  None. 
5. Consultation 
5.1 Contributions from services across our Council and Partners have been included in this
report. Services regularly consult with children, young people and families. A Young
Person’s version of the report will be developed over the summer months to ensure it is
fully accessible for our young people. 
Caroline Cameron
Director (North Ayrshire Health and Social Care Partnership) 
For further information please contact Lauren McMath, Policy Officer (Children’s
Services), (Health and Social Care Partnership), on 01294 324160,
laurenmcmath@north-ayrshire.gov.uk. 
Background Papers
Appendix 1: North Ayrshire Children’s Services Performance Report 2025/26 
112

Page 113

Children’s Services Plan – Performance
Report 2025-26 
113

Page 114

2 
Contents
Welcome 3
Introduction 4
Priority 1 – The rights of children and young people are promoted and protected 5
Priority 2 – Acting early to improve what happens next 16
Priority 3 – Making things fairer 25
Priority 4 – Promoting good mental health and wellbeing 37
Priority 5 – Inspiring children and young people to be active 41 
114

Page 115

3 
Welcome 
Welcome to the 2025-26 Children’s Services Plan Performance Report. In this report we hope to
demonstrate some of the key work of the Children's Services Strategic Partnership members and
highlight our progress and achievements over the past year. 
This is the last performance report aligned to our 2023-26 Children’s Services Plan and we close
off this Plan hoping to show the improvements that have been made as we worked towards our
vision for ‘North Ayrshire to be the best place in Scotland to grow up’ while we continued to focus
on promoting children and young people’s wellbeing, underpinned by Getting it Right for Every
Child (GIRFEC) and the United Nations Convention on the Rights of the Child (UNCRC).
We recognise that our strong partnership foundation in North Ayrshire provides continued
commitment to collectively focus on improving outcomes for our babies, children, young people
and families. 
Our aim going forward will now be to join up our key areas of focus and planning into a
streamlined Children and Families Plan for 2026-29 and continue to build on all the progress
made through our Children’s services Strategic Partnership to drive forward our ambitions for
North Ayrshire. We want to make sure that we move seamlessly into a Whole Family Support
model of working where we continue to place babies, children, young people and families at the
very heart of service delivery so we can provide the right support at the right time. 
Caroline Cameron Director North Ayrshire Health and Social Care
Partnership (Chair of North Ayrshire Children’s Services Strategic
Partnership)  
115

Page 116

4 
Introduction
This report focuses on the key highlights over 2025/26 and has been organised around the five
Priorities set out in the Children’s Services Plan 2023-26. 
We are currently reporting on the third and final year of our Children’s Services Plan which covers
2025-26. The five Strategic Priorities are shown above.
Our Children’s Services Strategic Partnership is the responsible group providing leadership in the
delivery of the Children’s Services Plan’s vision of our children and young people having the best
start in life and for North Ayrshire to be the best place to grow up. This strategic group includes
members from: 
• North Ayrshire Council
• NHS Ayrshire and Arran 
• North Ayrshire Health & Social Care Partnership
• Police Scotland
• Scottish Children’s Reporters Administration
• Care Inspectorate
• Children’s Panel 
• Third Sector
• Scottish Fire and Rescue
• Ayrshire College
• KA Leisure
 Appendix 1 to this report provides detailed updates for the 2023-2026 Children’s Services
Plan Actions for 2025-26.
 Appendix 2 provides Performance Indicator data.
 Appendix 3 provides our Whole Family Wellbeing Support report for 2025-26. 
For any further information please contact Strategic Planning Team on
strategicplanningHSCP@north-ayrshire.gov.uk
116

Page 117

5 
Priority 1 – The rights of children and young people are
promoted and protected
Key Highlights and Progress 
Children’s Rights 
We have been working to champion the United Nations Convention on the Rights of the Child
(UNCRC), ensuring that all children in North Ayrshire have their rights met, protected and
advocated for. In July 2024, the United Nations Convention on the Rights of the Child
(Incorporation) (Scotland) Act 2024 came into effect. The Act provides protection for the human
rights of children and young people in Scotland.
Rights Respecting Schools 
All North Ayrshire schools take part in the UNICEF Rights Respecting Schools Award (RRSA)
programme, showing a strong commitment to children’s rights in education. Schools are
making good progress — by December 2025, 24 have Bronze, 29 have Silver, and
18 have Gold awards. 
Schools say the RRSA programme helps children talk about their rights, builds confidence, and
improves school life. Pupils are more involved in making decisions and support each other,
creating welcoming and safe environments for everyone. North Ayrshire is clearly committed to
children’s rights through this work. 
Case Study:  Lockhart Campus was recognised for making good progress towards embedding
the principles of the United Nations Convention on the Rights of the Child into their ethos and
curriculum by gaining Silver accreditation. 
117

Page 118

6 
The Silver Rights Respecting Schools accreditation is a significant milestone to celebrate how
Lockhart Campus is putting children and young people’s rights into the heart of everything that
they do. The campus joins others such as Largs Early Years Centre, Springside Primary School,
West Kilbride Primary School and St John Ogilvie Primary School who have all progressed to silver
in the last year.
Assessed at the end of 2025, the silver accreditation has been reached following a number of
actions and initiatives developed alongside the Rights Respecting Schools Steering group – with
pupil representation from right across the school.
Embedding the United Nations Convention on the Rights of the Child (UNCRC)
Over the last year, UNCRC principles were embedded through targeted consultation and
participation activity with children and young people. Engagement included 114 Primary 7 pupils
participating in Youth Council workshops exploring key UNCRC articles, including Article 8
(identity), Article 26 (child poverty), Article 27 (risk-taking behaviour) and language and inclusion
(Article 30). Feedback gathered is informing service planning and was shared with partners.
Young people co-produced the Pupil Voice Toolkit, providing practical guidance to support
inclusive and meaningful pupil participation and delivery of Article 12 of the UNCRC. Connected
Communities staff, alongside Education, continued to lead UNCRC implementation through
staff training, member briefings, child-friendly reporting and direct engagement with young
people, ensuring a consistent rights-based approach across Council services.
Care experienced young people were engaged through the Champions Board across all 10
secondary schools, with delivery of the What Is The Promise? programme supporting awareness
of rights and The Promise. 
118

Page 119

7 
Young people identified priorities through structured engagement, which were presented directly
to staff and senior leaders to inform corporate parenting practice.
Strategic consultation also took place through large-scale engagement events, including a Joint
Cabinet session involving over 200 secondary pupils, where young people shared views on
poverty, wellbeing, risk-taking and employability with elected members and Chief Officers.
Additional UNCRC-aligned engagement was delivered through the Joint Youth Forum and Youth
Conference, ensuring children and young people’s voices informed policy development, service
redesign and decision-making across the Council.
Maximising learner participation and voice
The new Learner Participation policy and operating procedure (POP) was launched across all
establishments. The Young Leaders of Learning programme was piloted by 11 Early Years centres
and schools. This programme enhanced opportunities to maximise learner participation and
learner voice across the pilot establishments. 
Young Carers
We are committed to identifying Young Carers earlier in their caring journey and increasing the
uptake of Young Carers Statements. Significant progress has been made across education
settings to embed consistent, meaningful support.
• 15 local primary and secondary schools have now signed up to the Young Carers
Covenant, ensuring that young carer awareness and tailored support are embedded into
school culture.
• The number of Young Carers Statements offered and accepted across education
continues to grow, reflecting stronger identification pathways and increased confidence
among staff in recognising and supporting young carers.
• A comprehensive Young Carers Education Information Pack has been developed to
strengthen professional understanding and enable a consistent approach to support
• Young Carer Statement training sessions have been delivered for staff, helping ensure that
statutory duties are met and support is personalised and meaningful.
• Through collaborative work, the Carers Gateway and local schools have established a
shared working agreement, reviewed annually, which sets out mutual goals for identifying
and supporting young carers. 
These may include:
o Regular group sessions within schools
o Dedicated one-to-one support for young carers
o Developing a Young Carers Charter tailored to each school
o Awareness-raising activities for pupils, families, and staff
o Providing targeted resources for each school’s needs
o Support during key transition points, including P7–S1 and the move to post-school
destinations 
119

Page 120

8 
This collaborative, prevention-focused approach ensures young carers are identified earlier,
understood better, and supported in ways that make a genuine difference to their wellbeing and
educational experience. 
LGBT Youth Scotland Charter of Education
Irvine Royal Academy has become the first school in North Ayrshire and the latest secondary
school in Scotland to have achieved the prestigious LGBT Youth Scotland Charter of Education
Gold Award.
A national award, the LGBT Youth Scotland Charter of Education Gold Award accreditation -
awarded by Glasgow based charity, LGBT Youth Scotland - recognises schools that go above and
beyond the basic requirements to support LGBT pupils, staff, parents and carers.
Being accredited enables schools to share a positive message championing the LGBT community
with confidence, where all LGBTQ+ staff, parents and learners can be safe, supported and
included.
As part of the important work, over the past year, Irvine Royal pupils and the colleagues
supporting them have:
• Hosted a weekly Pride Group drop-in every Tuesday for LGBT pupils and allies
• Created their own LGBT inclusion board in the main foyer of the school
• Hosted a Pride Month celebration with film screening of Heartstopper film
• Introduced more diverse book titles in the school library
• Ran a drop-in session during LGBT History Month 2025 to celebrate queer icons
• Enjoyed a picnic outing and scavenger hunt at McGavin Park in Kilwinning in partnership
with Kilwinning Academy’s Equalities group
• Helped to promote and be involved in weekly wellbeing walking sessions
120

Page 121

9 
• Worked closely with the school’s leadership team and pupil voice ambassadors to
develop initiatives to support pupils who may be self-conscious or finding it difficult to be
themselves in school
Young people involved in the Irvine Royal Pride Group said:
• “I really feel like I can be myself and I know where I can turn to for support.”
• “I am proud to be part of a school that celebrates my muchness and gives me safe spaces
to express myself and make my voice heard.”
• “Although I am not queer, I feel like I have the strategies and knowledge now to help my
friends who are if they are struggling so that they know they are not alone.”
• “The weekly group has made such a difference to my wellbeing.” 
Six North Ayrshire secondary schools have now either achieved or are on their journey to
achieving their next level LGBT Charter for Education accreditation. Irvine Royal Academy now
has Gold. Greenwood Academy and the North Ayrshire Youth Services team follow closely
behind, holding Silver Level. Although not a school – North Ayrshire Youth Work is part of the
council’s Community Learning and Development team and should still be recognised equally for
their accomplishments to achieve the Silver Level. 
Engagement and Consultation 
Our Youth Services Team are central to the engagement and consultation with our young people
through various methods including community-based youth forums, Executive Youth Council,
thematic youth work groups, Joint Cabinet, P7 youth council and various other events. We also
actively engage with young people to gather their views and opinions through online methods and
social media. Topics are co designed and produced with young people and provide valuable data
to inform polices, plans and service delivery. 
121

Page 122

10 
Community learning and Development supported 5,796 young people through active citizenship
and community participation through youth forums, Joint Cabinet, Community Councils, Place
Framework activity, consultations, climate workshops, community investment activity and issue-
based youth work. Engagement strengthened voice, shared decision-making and confidence in
shaping local priorities.
Democracy and Citizenship
We support children and young people to have their voices heard, in line with UNCRC Article 12.
They are involved through youth forums, Joint Cabinet, Community Councils, consultations,
climate workshops and issue-based youth work. These activities help young people build
confidence and take part in decisions about their communities.
We worked closely with partners such as Education, the Alcohol and Drug Partnership, Police
Scotland, outreach services and third sector organisations. This created more chances for young
people to get involved and speak about issues important to them, including wellbeing, substance
use, poverty and keeping safe.
The Executive Youth Council and MSYPs met regularly and took part in work on budgets, food
insecurity, period poverty and equality. Young people also helped shape services through Joint
Cabinet sessions, the Youth Forum and the annual Youth Conference. What young people told us
continues to shape planning, services and decision-making. 
Case Study: During National Youth Work Week in November 2025, the bi-annual Joint Cabinet
took place at Saltcoats Town Hall welcoming pupils from across our six localities, with Arran
joining virtually.  This was a landmark #YouthParticipation event for young people between the
ages of 12-25, and the meeting was delivered by North Ayrshire Youth Work and the council’s
team of Youth Work Modern Apprentices for pupils to tackle a range of hard-hitting issues. The
122

Page 123

11 
joint meeting involved North Ayrshire Council’s Cabinet, senior education managers and other
senior officers alongside Members of Scottish Youth Parliament and the Youth Council Executive.
Almost 100 pupils representing the secondary schools of Irvine Royal, Greenwood, St Matthew’s,
Kilwinning, Largs, Auchenharvie, Ardrossan, Garnock Community Campus and Lockhart Campus
gave it their all in the action-packed session.
In a conversation café format, the discussions centred around key themes that had been decided
upon by young people prior to the event, including:
• Alcohol and drugs, where pupils discussed concerns, health harms and community
impact
• Risk taking behaviour, discussing consequences and sharing views on early intervention,
risk-awareness and restorative justice
• Child Poverty, looking at the council’s Child Poverty Action Plan, the impact on young
people and how families can access help without stigma
• Positive Relationships and Wellbeing, talking about alternatives to exclusion from school
and how to maintain relationships with friends, school, and beyond
• Employability Pathways, including modern apprenticeships, digital and cyber
opportunities, how to access support and what work experience activities young people
want
The theme of this year’s National Youth Work Week centred around building brighter futures and
safe spaces for young people to thrive. 
Youth voice is an essential part of ensuring our young people have safe and accessible spaces
where they can be supported and empowered to speak up on what matters to them and learn
more about how their local authority operates and where to find support locally. The energising
morning was a brilliant example of the true power that the youth voice in action has, and the
council’s commitment to the United Nations Convention on the Rights of the Child.
123

Page 124

12 
The Promise
Champions Board
Our Champions Boards place care experienced young people at the heart of decision-making
across their schools and the wider community. They provide safe, positive spaces where young
people can be heard, build confidence and belonging, and shape the services and supports
around them. Supported by the Corporate Parenting Team, the Boards help ensure North Ayrshire
fulfils its duties as a Corporate Parent and continues to deliver on its commitment to
#KeepThePromise.  
Across the current school year 2025/26, engagement has strengthened, with all 10 secondary
schools now running active Champions Boards. Some of the impact on young people can be
seen below: 
“I have made new friends and can be myself.” – Young person, 2025 
“One of our pupils attended the Champions Board for the first time feeling unsure… She realised
she wasn’t alone and left feeling connected, understood and comforted.” – Guidance Teacher,
2026
As part of their ongoing Champions Board work this year, young people requested clearer support
to understand what The Promise means for them. In response, schools are working through the
What Is The Promise? programme (developed with Action for Children), which helps build
knowledge, confidence and a shared understanding of rights. Several young people are also
completing the Hi5 Award, recognising their achievements and participation through the
Champions Board pathway. 
124

Page 125

13 
Champions Board Conference
In November 2025, we held our annual joint Champions Board Conference, attended by 9 out of
10 secondary schools and 59 young people. The conference was co-designed with young people
and focused on themes they identified as important, including:
• Understanding The Promise
• Using their voice safely and powerfully
• Building connections with peers across schools
• Planning the Summer 2026 Programme
Their views from the day have been captured in the What Matters To Us poster (pictured above),
alongside feedback from other engagement activities. Together, this provides a summary of what
matters most to our care experienced young people and will directly inform the next Corporate
Parenting Plan.
Staff Promise Conference 
The staff Promise Conference on 20th January 2026 brought together 81 attendees, including 10
care experienced young people, senior leaders, operational managers, and corporate parenting
partners. The event focused on reflecting on our responsibilities as corporate parents,
strengthening commitment to The Promise, and gathering staff voice to inform the Corporate
Parenting Plan refresh.   
Key Points from the conference included hearing directly from young people and reinforcing the
need for collaboration, clarity, and shared ownership across services. Actions from the
conference will be taken forward into the refreshed Corporate Parenting Plan.
125

Page 126

14 
Brighter Pathways Programme
The Brighter Pathways Programme of remodelling care options aims to improve outcomes for
care experienced children and young people, addressing systemic challenges, and ensuring
sustainable care models. The Strategic Vision emphasises collaboration, investment, and a
rights-based approach to create a sustainable, responsive, and a nurturing care system for
children and young people in North Ayrshire and aligns with The Promise.
The Brighter Programmes Programme Board was established in February 2024 and has provided
strategic leadership with a strong corporate parenting collaboration. The transformation and
service developments were delivered through focussed workstreams on the following areas: 
1. Housing and Throughcare 
2. Fostering and Kinship 
3. Education including Residential School Placements 
4. Internal Children’s Houses – Model of Care 
5. Early Intervention & Intensive Family Support 
6. Strategic Needs Assessment/Data/Workforce 
7. Best Practice Models and Research 
Key themes and challenges emerging from the workstreams are: 
• Placement Pressures and Over-occupancy. 
• Workforce Wellbeing and Sustainability. 
• Fostering Capacity. 
• Transitions and Continuing Care. 
• Early and Intensive Support Gaps. 
• System Complexity and Coordination. 
• Use of Data and Evidence. 
• Housing and Throughcare Pressures. 
The Brighter Pathways work has involved all corporate parents which has assisted in a shared
awareness of the challenges and opportunities to improve the provision of services for families,
looked after children and care experienced young people. Progress during 2025-26 has included: 
Our supported accommodation model of care is nearing completion with a proposed opening
date of 1st June 2026. This is designed to increase independence whilst maintaining relational
support on a phased and gradual basis, rather than young people experiencing the cliff edge of
transitioning to adulthood which they often talk about. 
Fortnightly planning meetings are taking place to discuss matching young people to the
supported accommodation. 
A new Fostering Scheme has been introduced, effective from 1st April 2026 to help retain current
foster cares and encourage new foster carers. This will support placement stability by increasing
retention of current experienced carers alongside strengthening approaches to local recruitment,
reducing reliance on external provision (which is more often than not, not local). 
126

Page 127

15 
The Moving on Forum has been implemented to encourage multi agency working between
Throughcare and Housing. The Forum has improved coordination between Housing and
Throughcare, with reduced delays in accommodation making decisions resulting in more
predictable and better planned transitions for care leavers.  This joint approach has helped
mitigate impact of increased housing pressures by ensuring earlier planning alongside shared
ownership this has resulted in day-to-day collaboration across Throughcare, Housing, internal
children’s houses, fostering and kinship services. 
Care Experienced Leavers educational outcomes
2025 North Ayrshire care experienced school leavers data continued to show improvements. 
65% of care experienced leavers achieved at least one qualification at SCQF Leve 5 or better.
42% of care experienced school leavers in North Ayrshire left with at least one qualification at
SCQF level six or better. 
Enhancing digital learning
Our Education Service’s Digital Learning Strategy was launched in March 2025 following
successful collaborative work of the Digital Service Improvement Group, a group consisting of
highly experienced practitioners from across all sectors with responsibility for delivery of the
curriculum from 2-18.
The Digital Learning Strategy aims to:
• develop learners’ digital skills and prepare them for life in an increasingly complex world
• ensure that our practitioners are able to use a range of digital technologies confidently
and appropriately to deliver exciting, supportive, relevant and engaging learning
experiences
• support our establishments in achieving strong outcomes in external evaluations
There are four main areas within the strategy as outlined below:
1. the vision and aims of the strategy (linked to high quality learning experiences for all
children and young people in NAC)
2. the digital skills our children and young people need for learning, life and work
(progression tables for each skill)
3. the digital skills our practitioners require to ensure our learners’ digital needs are met
(progression tables for each skill)
4. tools and training, as well as examples of good practice at local and national levels
Following a successful pilot, the expectation has been that all educational establishments will
adopt the strategy from session 2025-26 onwards as part of their raising attainment approaches
and across 2025-26 the strategy will become embedded across establishments, from Early Years
through to Senior Phase. Underpinning this strategy are the digital skills of our practitioners. Our
digital learning offer in 2024-25, delivered by the Digital Development Officer, has resulted in the
following:
127

Page 128

16 
128

Page 129

17 
Priority 2 – Acting early to improve what happens next
Key Highlights and Progress 
Child Protection - Children and Young People Engagement Event 
In May 2025, over 100 children and young people engaged with the North Ayrshire Child
Protection Committee (CPC) in relation to child protection messaging. The CPC wanted to learn
more about what children and young people knew about accessing support on a range of child
protection issues. 
Gaps in knowledge or sources of information were identified and discussions with children and
young people identified the best ways to share child protection messages and information and in
accessible formats. 
During the engagement event children and young people (aged 11-13 years) from schools across
North Ayrshire took part in six workshops to share their views and opinions on a safety theme
including, general child protection messages, mental health and suicide prevention, alcohol and
substance misuse (vaping), bullying and healthy friendships, domestic violence and
relationships, and online safety /safer schools.                           
Using feedback and data from this event and consultations with our children and young people
will continue to be a focus and also guide next steps to implementation of child protection
messaging. North Ayrshire children and young people’s views will influence policy developments
and resources required to make improvements.
Through the Safer Choices, Safer Futures, progress has been made in working with whole
families, whole systems and whole communities to provide early intervention support for
children and young people across North Ayrshire. 
129

Page 130

18 
Partnership working with Education, ADP, Police Scotland, extended outreach services and the
third sector has strengthened joined-up responses to identified risks, enabling support to be
offered at the earliest possible stage. This whole-system approach has focused on prevention,
relationship-based practice and community engagement, ensuring that children, young people
and families receive the right support at the right time. By aligning universal services with
targeted interventions, Safer Choices, Safer Futures continues to support positive outcomes,
reduce escalation of need and promote safer, healthier communities. 
Signs of Safety 
Signs of Safety was launched in North Ayrshire Health and Social Care Partnership in 2023 and is
now fully embedded into professional practice. 
Signs of Safety (SoS) is described as an approach “to enable children's services to deliver
services with a rigorous focus on child safety and wellbeing, and to set up their practice, policy,
procedures and organisation so that the practitioners can do everything possible to put the
parents, children and everyone naturally connected to the children at the centre of the
assessment and decision-making”.  Implementation has included briefings and training for
relevant staff, baseline audit work and realignment of paperwork. 
In June 2025, the Health and Social Care Partnership carried out a Signs of Safety audit where
10% of parents and carers were interviewed. Between 70% and 84% reported that their worker
showed care, spent time with their children, helped them solve problems, recognised family
strengths and followed through on agreed actions. This feedback provides a strong foundation for
continued improvement.
Children and young people also reported positive experiences. Most said they felt listened to
(63%), supported by their social worker (69.5%), and confident that their social worker
understood their family circumstances (76%). Importantly, 71% said they felt they had a say in
decisions affecting them.
Overall, the findings indicate strong, trusting relationships between families and practitioners.
Given the central role of effective relationships in achieving positive change for children, this
provides a solid and encouraging base for ongoing development of Signs of Safety practice.
130

Page 131

19 
Social Media
We have recently developed a Public Protection Facebook page. In August 2025, North Ayrshire
Protecting People Facebook page achieved 2,372 views with 218 followers and 138 likes. This
remains under review with a further assessment to be made in 2026 on the efficacy and reach
of this channel in supporting Child Protection communications.
Children and Families Health Support
There are over 5000 children aged 0-4 years in North Ayrshire, all of whom are supported by either
a Health Visitor or a Family Nurse.  In addition to following the nationally agreed Universal Health
Visiting Pathway from the antenatal period through to a child commencing school, within North
Ayrshire, children under 5 and their families continue to have access to additional support from
the wider, integrated early years team. 
During 2025/26 (as at March 26), 730 requests for assistance from the various members of the
integrated team were made.  This included: 
• 461 (83.6%) for Health Visiting Support Workers for areas such as communication, sleep,
toileting, infant feeding and behavior 
• 64 (8.8%) for the Perinatal Wellbeing Team, supporting new and expectant mums
experiencing low level mental health difficulties 
• 60 (8.2%) for the Family Nurturers who offer support around bonding and attachment,
routines, home conditions and community integration 
• 57 (7.8%) for Early Years Social Workers supporting with domestic violence, parental
mental health difficulties amongst others 
• 38 (5.2%) for specialist infant feeding support 
• 29 (4.0%) for support to dads via our partnership with national charity Dads Rock 
131

Page 132

20 
• 19 (2.6%) for the Healthcare Support Worker who provides additional support to the
Perinatal Wellbeing Team as well as baby massage 
Childhood Immunisations
The most recent childhood immunisation data for 2024/25, shows 75.2% of those in S1 were
immunised for HPV in Ayrshire and Arran, compared to a Scottish uptake of 72.6%.  HPV
immunisation uptake has seen a rise of 10.1% in North Ayrshire from 2022 to 2025.
In 2024/25, 67.5% of S3 pupils received a Td/IPV booster and MenACWY vaccines.  This
compares to a national uptake of 70.1% for both programmes. North Ayrshire has seen a rise of
0.7%. (2025-26 data is not available at time of writing). 
It is acknowledged that immunisation rates in North Ayrshire have been historically lower than in
South and East Ayrshire, closely correlated with deprivation levels. A range of targeted actions
have been taken to promote uptake rates. With the targeted interventions and data capture our
aspiration is to continue our upward trajectory for Immunisation Uptake in both HPV, Teenage
Booster and Meningococcal ACWY across Ayrshire and Arran, and in particular North Ayrshire to
lessen the gap in uptake across Local Authorities.
Infant Feeding and Support
Breastfeeding has clear short- and long-term health benefits for both babies and mothers. It
helps protect babies against infections such as ear, chest and gastrointestinal illnesses, as well
as conditions including asthma and diabetes. 
Breastfed babies are also more likely to follow a healthy growth pattern, reducing the risk of
overweight in later childhood. As a result, breastfeeding is a key indicator of child wellbeing and
remains a priority for children’s services.
Although breastfeeding rates have historically been low and closely linked to deprivation, North
Ayrshire has seen encouraging improvement. Increases have been recorded at the first health
visitor review (10–14 days) and at 6–8 weeks. More babies are now receiving some breastmilk,
and the drop-off in breastfeeding between birth and early reviews has reduced.
From 1 July 2025, the National Childbirth Trust began providing postnatal breastfeeding support
for women discharged from Ayrshire Maternity Unit who were breastfeeding. Between July and
March, 1,331 women accessed this support, with around half exclusively breastfeeding at 6–8
weeks. Community-based infant feeding support continues to be strengthened through:
• Mandatory, high-quality training for health visiting and support staff, reviewed regularly
to reflect best practice
• Annual audits involving staff and mothers to inform training and recognise good
practice
• Clear care pathways to support consistent and standardised delivery
• Specialist support for families with more complex feeding needs through the Infant
Feeding Support Nurse
• Community infant feeding groups, expanded following a successful pilot in Largs
132

Page 133

21 
• Roll-out of the national Early Learning and Childcare (ELC) Breastfeeding scheme
• Ongoing development of the Local Authority Breastfeeding scheme
North Ayrshire, together with health visiting and Family Nurse Partnership services in East and
South Ayrshire, holds UNICEF Baby Friendly Initiative Gold accreditation. This reflects high
standards of infant feeding support, a strong focus on breastfeeding, and a continued
commitment to quality improvement. This remains a significant achievement, with only a small
number of areas across Scotland holding this status.  
Ayrshire Bairns app
A digital resource providing evidence-based parenting advice and support was piloted by North
Ayrshire in 2022 and is now well established across all three Ayrshires Health and Social Care
Partnerships. The app provides information on what to expect from the health visiting service as
well as information on how to support early years development.
Collaboration for Health Equity in Scotland (CHES)
North Ayrshire is one of three local authorities who have been working with the Institute of Health
Equities (IHE) and Public Health Scotland as part of the Collaboration for Health Equity in
Scotland (CHES) programme.  Three priority areas were identified in North Ayrshire: Good Start
(Irvine), Good Work (Three Towns) and Good Health (Garnock Valley).
The Good Start workstream is aiming for all children to have the best start in life and through
stakeholder and family engagement has identified areas of work that may help improve wellbeing
in early years and wider family support.  Work will be taken forward in 2026/27 through a multi-
agency approach.
North Ayrshire’s involvement in the CHES programme provides an additional opportunity to focus
on early years. Indeed, data on developmental concerns was a key driver in the prioritisation of
133

Page 134

22 
the early years’ principle, and helped identify the Irvine communities of Fullarton, Bourtreehill
and Castlepark as the focal point for the work.
Nesta and CELCIS family support in pregnancy and early years
North Ayrshire is one of six local Children’s Services Strategic Partnerships (CSSP) selected to
work with national organisations Nesta and CELCIS to explore existing pregnancy and early
childhood supports and infrastructure. The opportunity aims to:
• formulate a tailored early years data profile compiling indicators relevant to your area and
at intermediate zone level where possible (created by Nesta)
• map current support offer for pregnancy and early childhood
• identify specific strengths and areas of unmet need to inform local planning
• make clear, evidence-based recommendations for our local planning processes
• facilitate engagement with peers from five other CSPP areas to share learning and improve
systems across Scotland
• contribute to national and local policy and practice recommendations
Key partners have participated in two workshops to look at what works well and where things
could be better for families.  Learning will be used locally to improve our family support and will
also be shared nationally to influence children’s services’ policy.
Speech and Language 
We have a North Ayrshire Early Language Network group that meets regularly to share
information about supports available to children, young people and families seeking support for
speech, language and communication. The groups consist of partners from Health, education,
early years social work, Family Nurse Partnership, and the 3rd sector.  
We also have a Communication Champion Network in Early Years in North Ayrshire that links
closely with the Speech and Language Therapy team to share practice.  
Additional training has been provided for Communication Champions to identify children who
may require targeted support in early years, share resources with parents and signpost them to
the Speech and Language Therapy helpline and our in person drop-in sessions.
We run a monthly Social Communication in person drop-in session.  Any family with a concern
about their child's social communication or activities for daily living can meet with the Speech
and Language Therapy team and Occupational Therapy team to receive advice.
The NHS Ayrshire & Arran Children's speech and language therapy Facebook page and NHS
Ayrshire & Arran app contains lots of useful information for families and practitioners, with many
activities to help support children's speech, language and communication.
The Helpline is available for anyone with a concern about a child's speech, language and
communication. They can speak to a registered Speech & Language therapist and receive advice
and resources.
134

Page 135

23 
Early Learning and Childcare
The 1140 funded hours continue to be delivered with flexibility and choice for parents across
localities. Our models offer a blend of full year and term time places with various patterns in
establishments delivering 8am-6pm and 9am-3pm. Allocations have taken place for session
2025-26 and 85% of parents have been offered their 1st choice for establishment. Work is
continuing to raise awareness of eligibility and increase the uptake of eligible 2s. 
ESOL (English for Speakers of other Languages) and Asylum Seekers and Refugee
support
The New Scots ESOL (English for Speakers of Other Languages) Hub provides a strong illustration
of how education, voice, advocacy, rights, community connection and belonging can be
translated into effective practice. It delivers a holistic, rights-based model of support for
unaccompanied asylum-seeking children, trafficked young people and refugees across North
Ayrshire. 
Accessible and sustainable language support is key, underpinning engagement with education,
health, advocacy, employment and community life which contribute to positive outcomes.
Our nurturing and responsive environment supports our young people who have experienced
trauma, disruption or displacement. Inclusive practices and culturally responsive approaches
ensure that learners’ identities are respected and valued, promoting a sense of identity,
belonging and connection.
Fourteen learners attended the Hub during 2025-26, representing a wide range of backgrounds.
Learners accessed full-time education alongside community-based learning opportunities,
supported through strong multi-agency partnership working with education, Outreach Support
Services, Community Learning and Development, Health and Social Care Partnership, Aberlour
Guardianship, Ayrshire College and other third-sector partners.
Learners participated in a range of opportunities including the Gowanbank Residential, with
pupils from Extended Outreach, which supported confidence, teamwork and resilience. Other
activities included tree planting and a Christmas Multicultural Event.
Participation, Attainment and Positive Destinations:
A wide range of achievements, including personal development, language acquisition and a
range of academic and wider awards were celebrated. 
• Eight young people achieved SQA National 2 ESOL alongside SQA National 2 Lifeskills
Mathematics 
• A further 2 young people achieved National 3 ESOL at Ayrshire College and National 2
Lifeskills Mathematics 
135

Page 136

24 
• As a result of targeted support and effective partnership working, 8 learners will
successfully progress to college courses
• Two young people achieved accreditation through the John Muir Award delivered in
partnership with Barnardo’s. This supported environmental awareness, responsibility and
achievement of a nationally recognised award, contributing positively to confidence and
wellbeing.
• Effective partnership working with Skills Development Scotland supported career
education, employability skills and transition planning, ensuring learners received timely
advice linked to post-school destinations.
The Hub contributed actively to the Unaccompanied Asylum-Seeking Children (UASC) Working
Together group, strengthening information sharing, safeguarding and coordinated planning.
Engagement with the Guardianship Pilot drop-in at Saltcoats Town Hall improved access to
advocacy and guidance for young people.
Collectively, this work contributes to:
• Improved safety, advocacy and coordinated support for vulnerable learners
• Enhanced wellbeing, confidence and resilience
• Increased achievement and progression
• Strengthened participation, inclusion and rights-based practice
• More robust partnership working and shared accountability
Practice from the Hub was shared at The Promise Conference, contributing to national dialogue
and supporting wider systems improvement across children’s services and education.  
136

Page 137

25 
Priority 3 – Making things fairer
Key Highlights and Progress
Educational Attainment
Raising Attainment 
Raising attainment continues to be a focus for all schools and Early Years establishments, with a
commitment to ensuring added value across and through all 3 sectors in a child’s learning,
attainment and achievement.   Senior leaders’ feedback and the Data Service Improvement
Group have helped to shape a refreshed approach to collecting Literacy and Numeracy data and
how this is then used to create targets for all establishments. A more focused approach in
analysing attainment data is helping to shape Service priorities and collaborative working
between central staff and schools to ensure that all learners attain and achieve their best
outcomes.
Achievement of Curriculum for Excellence Levels
In 2025, 68.2% of primary aged children in North Ayrshire Council achieved the appropriate
attainment level in Literacy. In Numeracy, 73.9% of primary aged children in North Ayrshire
Council achieved the appropriate attainment level in 2025. North Ayrshire’s performance has
remained lower than the national picture since Covid.
Improving leavers’ attainment in literacy and numeracy
In 2025, just over 93% of North Ayrshire’s school leavers achieved level four literacy or better. This
is in line with the national figure. Similarly, at level five, 81.9% achieved literacy at level five or
better.
In 2025, 91.3% of school leavers in North Ayrshire achieved level four numeracy, which is again in
line with the national figure. 73.3% of school leavers attained level five numeracy which has
increased from the previous year. 
Attainment of School Leavers
In 2025, 80.9% of school leavers attained 5 or more awards at SCQF Level 4 or better which is
slightly lower than in 2024 (83.4%).  64.5% attained 5 or more awards at SCQF Level 5 or better
which is in line with 2024. These levels are slightly below the National figures. 
School Leavers entering an initial positive destination
An initial positive destination means that a school leaver has gone on to one of the following
activities immediately after leaving school: further or higher education, training, skills
development or employment. At 95.7%, the proportion of leavers in North Ayrshire moving into an
initial positive destination in 2025 is in line with the national figure. To maximise the percentage of
school leavers entering and sustaining positive destinations, schools continue to work hard in
strong partnership with Skills Development Scotland.
137

Page 138

26 
The Annual Participation Measure for all 16–19-year-olds
The Annual Participation Measure (APM) is a measurement of the proportion of 16-19-year-olds
participating in education, training or employment over a whole year (1 April-31 March). The
indicator provides a measure of the status of the wider aged 16-19 cohort – not just those who
have left school. The Annual Participation Measure, covering the year from April 2024 – March
2025 showed that of the 6,028 16-19-year-olds in North Ayrshire, 92.5% were in education,
employment or training and personal development. 
School Inspections – Case Studies
Dalry Early Years Centre was praised by the Care Inspectorate for creating a warm, nurturing
and safe environment for young people. The unannounced inspection took place in September
2025 and carried out a thorough assessment of the staff and facility and concluded that the
experiences of children and families was extremely positive. 
During their visit, the inspection team spoke to one parent who said: ‘The staff are amazing,
always got time to chat and will help any way they can’ while another commented ‘I have been
involved in my child's plan from the moment they started at the nursery. All my views are taken
into account.’
Some of the findings include:
• Children were safe, secure, and emotionally supported
• Children's individual needs were well understood
• Children who required additional support received timely and effective intervention
• Children experienced rich and varied play opportunities indoors and outdoors
138

Page 139

27 
• Staff were warm, respectful, and purposeful
• Indoor and outdoor spaces were thoughtfully arranged to promote independence
• Leadership was strong and improvement-focused
The inspection also described the facility as a ‘welcoming, spacious, and well-ventilated
environment’, while playrooms were equipped with age-appropriate resources and natural
materials that supported children's play, learning, and creativity.
Springside Primary came under the spotlight in a visit in 2025 – and received a glowing report. In
the report, the head teacher and senior management staff were praised for their strong
leadership, including consistently driving improvements across the whole school. 
It also highlighted that ‘a strength of the staff team is their significant work towards improving
how they meet children’s needs across the school’. Staff also develop trust and strong
relationships with all the pupils
Pupils are described as being happy and that they feel safe and secure. Staff are praised for
nurturing relationships and understanding the needs of those pupils who need additional
support. As well as internally, the report praises the strong relationships that exist with
parents/carers and says most are very supportive of the work of the school.
Springside Head Teacher Lynsey Boyes said: “We are absolutely delighted with the outcome of
our recent inspection which recognises the dedication, effort and commitment of our entire
school community.  While we celebrate this achievement, we remain committed to the
continuous improvement of the school and early years and providing the very best education for
our children and young people.”
Employability First Steps Programme Launch
First Steps is an employability initiative that runs four times over the course of a year for care-
experienced North Ayrshire residents aged 16 to 24. It offers opportunities in activities such as
food hygiene, cooking, barista skills, team building, First Aid, the Duke of Edinburgh Award and a
host of other group and interactive training sessions.
139

Page 140

28 
Feedback from people who have completed the course has been positive, and 17-year-old
participant Axel, from Irvine, said: “The highlight, for me, was getting to learn about First Aid. I am
now exploring becoming a volunteer with St Andrew’s First Aid as I feel this is something I would
be really good at.”
Most participants go on to work experience, further education or training – and tailored work
experience is included. It is ideal for young people who are thinking about their future but are
unsure where to start and would like support when considering work, college, training and
volunteering options. Participants build on existing skills and move forward in a friendly and
relaxed environment.
Other participants shared: “The programme really helped me feel more confident in myself and in
my abilities and also helped me make new friends. I would recommend the course to my friends
and any other young people who are perhaps feeling unsure about their future and what type of
job they would like as First Steps really helped me feel better about my future. I am now enjoying
work experience in Barnardo's … and know I can make a difference.”
First Steps is run under the banner of the Council Employability service’s Your Next Move. The
Council’s Employability Service delivers a range of support through its Your Next Move, Working
North Ayrshire programme. Contracted partners include We Work for Families and CEIS Ayrshire,
who all contribute to delivering a wide range of support to help individuals prepare and progress
into employment. 
Poverty - Closing the poverty-related attainment gap 
Closing the gap in achievement between North Ayrshire’s least and most disadvantaged young
people is one of the Education Service’s five main priorities. Around 45% of local learners live in
the most deprived parts of Scotland. 
North Ayrshire’s Education Service is focused on helping children affected by poverty reach their
potential. Schools receive £4.2 million every year in Pupil Equity Funding so head teachers can
support pupils where help is needed most. Head teachers can choose the best ways to use this
money for their learners. 
140

Page 141

29 
Rigorous analysis of data for improvement at all levels includes a focus on closing the poverty-
related attainment gap and how educational establishments can support those children and
young people most affected by poverty.  Education Service priorities ensure that universal
approaches to improving learning, teaching and assessment, as well as raising attainment, allow
a focus on approaches to closing the gap.  
Strategic planning and spending of Pupil Equity Funding by schools allows for focused and
targeted interventions and supports for learners most affected by poverty, with input focused on
Health and Wellbeing, Literacy and Numeracy.  There remains a commitment in schools and in
the Education Service to mitigating against the Cost of the School Day, with approaches such as
uniform banks, Prom dresses and low/no cost trips and excursions.
Co-designing approaches to reduce child poverty 
North Ayrshire Council’s Child Poverty Strategy Team, through the Scottish Government’s Fairer
Futures Partnership, launched a local project to better understand and reduce child and family
poverty in specific areas. Initial research involved meeting families in libraries during school
holidays, speaking with 140 Primary 7 Youth Council members about the cost of living, and
asking young apprentices about how easy it is to get support online. After this, two local Third
Sector organisations received grants to help design and deliver new ways to support families,
working together with the council and community groups. New roles were created to connect
families with the right services at community spaces and events, and to spot gaps in support. 
This work helps families access social and economic support and ensures children and families
have a say in decisions that affect them. A shared database is also being developed to list
services related to child poverty and wellbeing, which will help staff — and eventually the
community — find support more easily. 
Case Study: Three pupils from Irvine
Royal Academy had the chance to meet
First Minister John Swinney and discuss a
poverty-related issue close to their
hearts in Scotland’s first Children and
Young People’s Cost of the School Day
Summit 2025, held at The Social Hub in
Glasgow and hosted by Child Poverty
Action Group (CPAG).
The young people, who form part of Irvine Royal Academy’s Cost of the School Day (COSD) group
discussed with Mr Swinney directly how to make education more inclusive and affordable for all.
Savanah, Jacob and Evie also played a key role in shaping the day – helping design sessions,
leading discussions and representing pupil voices from across Scotland. During the summit, they
delivered confident presentations and took part in engaging workshops. The event provided a
powerful platform for pupils to share their lived experiences and ideas for reducing financial
barriers in schools.
Chiara Sheridan, Youth Worker at Irvine Royal Academy said: “We are so proud of our young
people. They showed real leadership, confidence, and compassion, ensuring the voices of pupils
141

Page 142

30 
are heard at a national level. Their involvement in this summit will help shape positive change
across schools in Scotland.”
Welfare Rights in Schools Project
The Welfare Rights in Schools project expanded significantly during 2025–26, with three Welfare
Rights Officers embedded across all educational establishments, including early years centres.
Schools have provided trusted, stigma-free access to advice, enabling early intervention. During
the year, the project has secured significant financial gains for families. 
Child Poverty and Early Intervention Fund
Across its first two years, the Child Poverty and Early Intervention Fund has now committed over
£1 million, supporting both direct financial relief and innovative, co-designed test-of-change
initiatives. This includes investment in integrated data through Smart Data Foundry and piloting a
Family Enterprise Programme in partnership with Ayrshire College.
Financial Inclusion 
Our 2025 ambitions to deliver services through an Advice Line and a single point of contact are
now fully embedded. Client-centred surveys are routinely issued to strengthen our
understanding of impact and ensure service improvement. In-house debt advice is fully
operational, providing seamless access to both debt and welfare rights support.
The Financial Inclusion Partnership Communications Subgroup was established during the year
and successfully delivered the Partnership’s first multi-agency event in October. 
The event, themed around winter preparedness, brought together a range of services with the aim
of increasing awareness of support available across North Ayrshire and improving understanding
of how services connect and refer between one another. Workshops were delivered by Citrus,
Community Link Workers and Christians Against Poverty (CAP).
The Financial Inclusion Partnership continues to grow and strengthen, with new members joining
throughout the period. Collaborative working with third sector organisations and partner
agencies remains central, with a shared focus on developing clear referral pathways and
delivering coordinated, joined-up support for residents.
Rosemount Crisis Service
The Rosemount Crisis Service has built strong collaborative partnerships across North Ayrshire
by operating as a highly integrated, multi-agency service focused on supporting children and
young people with complex needs and significant levels of risk, with the clear aim of keeping
children safely at home with their families and out of local authority care wherever possible.
The service mainly works with the four Children & Families Social Work teams in North Ayrshire -
but also accepts referrals from the Families for Children, Children & Families (Disabilities),
Kinship and Young Person Support teams - and plays an important role in the wider
multidisciplinary response to family crisis, escalating risk, and instability. Rosemount is
embedded within statutory planning and decision-making processes.
142

Page 143

31 
Partnership working extends beyond social work to include Education, CAMHS, Police Scotland,
health services, and community-based supports, ensuring that children and families receive a
holistic, coordinated, and responsive service. This integrated model enables Rosemount to
respond effectively to overlapping issues such as family breakdown, distressed behaviour,
trauma, school non-attendance, mental health concerns, and contextual risks.
A key measure of the service’s impact is its consistent success in keeping over 90% of the
children involved with the service each year out of local authority care. This demonstrates the
effectiveness of intensive, relationship-based crisis intervention when delivered in close
partnership with families and professionals. 
Overall, the service’s strong local partnerships are central to delivering high-quality, child-
centred, and family-focused support, ensuring that children and young people with the most
complex needs receive the right help at the right time, while reducing the likelihood of escalation
into care.
Building Positive Relationships 
The Building Positive Relationships (BPR) programme has been successfully implemented,
adapted and evaluated. Staff have been training and supporting facilitators, updating resources
and responding flexibly to family and service needs. As a result, 89 practitioners across the
authority are now trained in the Building Positive Relationships programme, embedding a
preventative, trauma-informed approach that strengthens parental regulation, relationships and
resilience while reducing reliance on crisis intervention. 
The Education Psychology Service has delivered large-scale, evidence-based professional
Neurodevelopmental learning (e.g. We Were Expecting You, Supporting Neurodevelopmental
Needs, NAIT resources) that reached hundreds of practitioners across Early Years and schools,
with over 97% of participants reporting the training met their needs. This work is improving
inclusive, neuro-affirming practice, strengthening anticipatory planning and consistency, and
enabling many families to experience more predictable, supportive environments across home
and education.
Whole Family Wellbeing Fund
The Whole Family Wellbeing Fund (WFWF) has supported a shift towards preventative, trauma
informed and whole family approaches, in line with Scottish Government ambitions, GIRFEC and
The Promise commitment to reduce the number of children and young people in care by
addressing challenges earlier.
During the reporting period, 12 local projects and services received a share of the £1.19 million
WFWF investment in North Ayrshire, to support the delivery of positive outcomes for children,
young people and families across North Ayrshire. Three of the funded activities are detailed
below.
Dads Support Workers
Dads Support workers are strengthening preventative approaches by intervening at key transition
points, addressing underlying risks early and helping families break cycles of trauma to improve
long-term outcomes for children. For example, 20 referrals through Safeguarding Midwifery
enabled multi-agency support before birth; 13 families were care experienced, highlighting
significant intergenerational vulnerability. Reflective, relationship-based support alongside
143

Page 144

32 
antenatal care helped parents build insight, emotional regulation and confidence, contributing to
safer early environments.
Preventative impact is also evident in father-inclusive work, where tailored one-to-one support
enabled meaningful change, rebuilt trust and led to a supported, child-led reunion—reducing the
need for escalation and supporting family permanence. Peer support further strengthens
prevention, with Dads Rock networks offering ongoing informal support beyond services.
Five Dads Antenatal Workshops (launched July 2025) were delivered during the reporting period,
engaging 18 dads. Several participants went on to connect with peer support through the
WhatsApp community and weekly in-person groups following the birth of their children,
strengthening continuity of support during the early parenting journey. Engagement is
underpinned by non-judgemental, consistent relationships that build trust and encourage earlier,
sustained participation.                  
A major success was the service’s expansion, increasing capacity to 1.8 FTE, widening delivery
from Ardrossan, Saltcoats and Stevenston to include Irvine and Kilwinning, alongside the
introduction of a second group activity delivered outside standard 9–5 hours. This led to a 90%
exceedance of engagement targets, with 103 families supported and over 400 one-to-one
sessions delivered. Impact was further recognised through awards nominations and strong peer
networks that continued beyond formal involvement.
The Family Centred Wellbeing Service
The Family Centred Wellbeing Service (FCWS) plays a key preventative role across North
Ayrshire, supporting families early to reduce escalation to crisis and statutory intervention.
Partners across education and social work consistently report that, without FCWS, more families
would reach crisis point, increasing demand on child protection and specialist services. The fact
that cases are often retained within FCWS following Initial Referral Discussions (IRDs) reflects
strong partner confidence in the service’s ability to manage risk proportionately and provide
effective early intervention. During 2025/26, FCWS received 212 referrals, with 81% relating to
primary-aged children, indicating that needs are increasingly being identified and addressed
144

Page 145

33 
earlier, before difficulties become entrenched. Education remains the main referral route,
demonstrating a wider cultural shift towards proactive, early help within universal services.
This preventative impact is further evidenced through both qualitative feedback and outcomes.
Families report improved relationships, better communication and greater understanding of their
child’s needs, leading to increased confidence in managing challenges. Case study evidence
highlights how coordinated, whole-family support improves stability and prevents escalation to
statutory thresholds, while group-based interventions reduce isolation and build social
connections—key protective factors against crisis. FCWS also plays an important role in
supporting the “missing middle”: families experiencing emerging neurodevelopmental,
emotional or behavioural needs that do not meet statutory thresholds. By responding early with
holistic, flexible support—including home visits, group programmes and community-based
activity—FCWS helps prevent gaps in provision and reduces longer-term reliance on higher-cost
services. The non-judgemental, relationship-based model is central to engagement, with families
reporting that they feel more comfortable seeking help earlier and sustaining involvement.
A key strength of FCWS is its collaborative, whole-system approach. The service works in close
partnership with education, health, social work and third sector organisations, contributing to
multi-agency planning such as Team Around the Child (TAC) and acting as a bridge between
services. This ensures coordinated, holistic support tailored to the strengths and needs of each
family, including access to community-based opportunities that promote inclusion and reduce
isolation. This model has contributed to improved outcomes across a range of areas, including
school attendance and engagement, emotional wellbeing, parenting capacity and access to
mental health, financial and community supports, particularly for families experiencing
disadvantage.
Workforce development has also strengthened early intervention across the system. Input from
Educational Psychology and Speech and Language Therapy, alongside interventions such as
Building Positive Relationships, has increased practitioner confidence in identifying and
responding to emerging need. Weekly consultation with Educational Psychology has been
particularly valued, enhancing problem-solving skills and the use of practical tools such as goal
setting, scaling and emotion coaching.
Overall, sustained demand for the service, alongside strong qualitative and quantitative evidence
of impact, highlights FCWS as a key contributor to early intervention and prevention, improving
outcomes for children and families while reducing pressure on statutory services.
EmpowerED
The EmpowerED programme demonstrates a strong preventative impact by engaging young
people before difficulties escalate into crisis, particularly those at risk of disengagement from
education, emotional distress or more intensive intervention. Evidence from surveys, session
reflections and school feedback consistently indicates that many participants were struggling
with school engagement and wellbeing when referred. 
Preventative impact is evident in the programme’s relationship based and flexible delivery model.
Session reflections show that early stages often involved a period of settling in, with young
people initially hesitant or disengaged. Over time, however, there was a clear and sustained shift
towards increased participation, confidence and motivation. This progression illustrates the
145

Page 146

34 
value of consistent, trusted relationships in preventing problems from becoming entrenched and
reducing the likelihood of escalation to statutory or crisis services.
The programme also strengthens preventative outcomes by supporting emotional regulation,
resilience and social connection. Young people frequently reported feeling calmer and more able
to cope after sessions, especially following outdoor and active learning experiences. 
Opportunities to build friendships, share activities and support peers reduced isolation and
enhanced protective factors. Importantly, EmpowerED contributes to longer-term prevention,
with some young people progressing into peer mentoring roles, indicating growing confidence,
aspiration and leadership.   
Modern Apprenticeships
The Modern Apprenticeship programme is being used as a peer support model by creating
visible, relatable role-model opportunities for young people within their own communities.
Apprentices, many of whom have lived experience of local challenges, support younger peers
through informal mentoring, shared learning and positive role-modelling, helping to build
confidence, aspiration and engagement.
By positioning apprentices within community and youth work settings, the programme supports
peer-led learning, early intervention and prevention, enabling young people to access advice,
reassurance and support from someone they can identify with. This approach strengthens
relationships, promotes positive behaviours and supports children and young people to make
safer choices, while also building skills, confidence and progression routes for the apprentices
themselves.
146

Page 147

35 
Island Communities
Work has continued to strengthen equity of access to youth work support and participation
opportunities for children and young people in North Ayrshire’s island communities. Partnership
working with Arran Youth Foundation has supported the development of a local youth work offer
on Arran, ensuring provision is responsive to local need while remaining connected to wider
Council priorities.
Island communities are routinely included in all youth voice structures and engagement activity,
including the Youth Council, Joint Cabinet events and wider consultation processes, ensuring
young people from Arran have opportunities to influence local and strategic decision-making. 
The appointment of an MSYP from Arran has further strengthened parity of access, enabling
regular feedback from island young people and ensuring their views are represented consistently
at both local and national consultations. 
147

Page 148

36 
Young Carers
We are committed to ensuring that young carers can access support in ways that are flexible,
familiar, and responsive to their needs. A range of access routes have now been embedded
across education and community settings, ensuring a no wrong door to support model. 
Dedicated Young Carers Champions are now in place within every primary and secondary
school. These Champions act as a first point of contact for identification, support, and
information-sharing within their school communities.  Three Young Carer Workers are aligned to
clusters of three secondary schools and their associated primary schools. This structure ensures
consistent partnership working, proactive engagement, and timely support for young carers and
their families.
A termly Young Carer Newsletter is shared with education staff, providing updates on supports
available, upcoming events, awareness activities, and practical resources for working with young
carers. This helps maintain visibility and ensures staff remain informed throughout the year.
An upgraded Carers Gateway digital self-help portal for young carers was launched in August
2025, offering 24/7 access to a wide range of information, resources, wellbeing tools, and
guidance. The platform significantly enhances accessibility - enabling young carers to seek help
at any time, in a format that suits them.
Together, these access points ensure that young carers can engage with support through trusted
adults in school, dedicated staff, digital tools, or wider community activities. This blended model
strengthens early identification, reduces barriers, and offers young carers multiple pathways to
information, advice, and personalised support. 
148

Page 149

37 
Priority 4 – Promoting good mental health and wellbeing 
Key Highlights and Progress
Counselling support and community wellbeing supports 
Our school counselling service supports children and young people aged 10–18 in school
settings. This year, 500 young people accessed the service, with 98.6% reporting an improvement
in CORE-YP scores. Area Inclusion Workers and additional support staff continue to deliver Let’s
Introduce Anxiety Management (LIAM), with positive impact. Mental and emotional wellbeing
remains one of the ten priority pathways within the school nursing service, with all staff nurses
trained in LIAM and work underway to improve recording and reporting.
Through Children and Young People’s Community Mental Health and Wellbeing Supports and
Services Framework grant funding, 6,527 children and young people and 1,212 family members
were supported through a range of programmes, with 94% reporting improved outcomes. Early
intervention continues to be delivered across primary and secondary settings, with pathways in
place to school counselling, LIAM and conflict resolution sessions, and onward referral to
CAMHS where required. Collaboration with third sector partners has further strengthened local
provision.
The revised wellness model is now in place across all localities except the Three Towns, with full
rollout planned early next session. Education and primary healthcare colleagues report positive
partnership working, supporting timely access to mental health and wellbeing support. 
Support materials for delivery of the SQA Award in Mental Health and Wellbeing at Levels 4 and 5
were provided this session, with 343 young people achieving the full award. The refreshed Be
Amasin’ anxiety resources were shared via education and community mental health blogs,
attracting over 11,000 views combined. Project Restore continues to develop, with early
feedback showing improved wellbeing and engagement, particularly through breathing and
grounding strategies.
Area Inclusion Workers supported 5,541 children and families through individual and group
interventions to improve engagement with education and wellbeing. This included 64 reflections
groups and Building on Positive Relationships family groups for 35 families, using relational
approaches to address conflict and support positive family relationships
Nurture
A nurturing approach is being embedded across Children’s Services through shared
trauma-informed and relational practice. In Education teams this is evolving into a New Authority
model that combines compassion with clear, supportive boundaries. Professional learning in
nurturing, Emotion Coaching, Positive Behaviour Support and CALM is supporting consistent
adult responses focused on safety, regulation and repair.  This year there are examples of joint
problem-solving with Psychological Services, Children’s Houses and CAMHS - growing a
community of practice for care-experienced young people enabling shared learning and
consistency across services.
149

Page 150

38 
Physical activity and Social Participation
Targeted and universal programmes supported mental health, resilience and positive
relationships across schools and communities. Evidence-based and creative approaches such
as Your Resilience, Bounceback, Drama for Wellbeing and outdoor and physical activity
programmes developed emotional literacy, coping skills and self-regulation. Early intervention
addressing suicide, alcohol and vaping risks was complemented by workforce development in
neurodiversity, trauma and complex behaviours, improving the quality and consistency of
support.
The Duke of Edinburgh’s Award provided a strong wellbeing and achievement pathway, engaging
over 1,000 young people and supporting progression through Bronze, Silver and Gold levels.
Alongside this, targeted programmes and partnerships supported care experienced young
people, young New Scots and those facing additional barriers to sustain engagement, build
confidence and progress to positive destinations. 
Active Schools played a key role in promoting positive mental health through year-round
extracurricular activity, events and leadership opportunities that reduce stress, boost mood and
enhance self-esteem. A dedicated guidance resource for schools and comprehensive mental
health training for coaches and volunteers strengthened inclusive, supportive practice. Together,
these approaches demonstrate a coherent, strengths-based model combining participation,
prevention and progression to improve wellbeing outcomes at scale.
Public Health 
Public Health have worked over the 2025-26 period to produce a suite of life course evidence
briefings. The mental health and suicide prevention briefing will be used in the coming year to
shape conversations with partners regarding the preventive potential of a life course approach
and opportunities based on evidence across the life course and across all stages of prevention
(universal, primary, secondary, tertiary). 
150

Page 151

39 
During 2025-26, Public Health has continued to strengthen and embed mental health
improvement activity across Education and wider children’s services in North Ayrshire. Examples
of activity include: 
Promotion and Utilisation of Mental Health and Wellbeing Resources in Practice- The Guide for
Children, Guide for Young People and Children’s Workbook for Mental Wellbeing continue to be
actively promoted across Education and to partners who support children, young people and
families. Work this year has focused on reinforcing awareness of these resources, supporting
staff to build them into everyday practice, and ensuring consistent access to practical tools that
help initiate and sustain wellbeing conversations.
Mental Health Improvement – a Practical Approach (MHI-apa) training is now being delivered
across Education by the MHWB Operational Lead, building capacity at school level and ensuring
staff have the knowledge and skills to support children, young people and families. Area
Inclusion Workers continue to use and cascade this learning within their roles, contributing to
more consistent approaches across schools. This training is available through Public Health for
other groups who wish to participate. 
There continues to be a network of facilitators delivering Time, Space, Compassion (TSC)
workshops which are open to staff working across children's and young people's services. During
April 2025 and March 2026, Public Health has organised and delivered 12 TSC workshops across
Ayrshire and Arran. Four of these sessions were in North Ayrshire. Staff from North Ayrshire have
accessed a number of sessions, with attendance including staff working with children and young
people within both public and third sector organisations.
Initial discussions and awareness raising regarding the Enabling Conversations Toolkit has taken
place through the Strategic Suicide Prevention Group. In the coming year Public Health would like
to see further awareness raising and engagement with this toolkit as a guide which was created
by and for young people, to find help and support when experiencing painful feelings about
suicide. Enabling conversations toolkit - Suicide Prevention Scotland.
Supporting Young Carers
We continue to prioritise opportunities that enable young carers to experience a positive quality
of life beyond their caring responsibilities, while ensuring they are fully supported during key
transitions in education and life.
• Young Carers Education Fund (£15K–£20K annually) provides flexible financial support to
meet identified needs through Young Carers Statements. This includes opportunities for
breaks from caring, participation in hobbies and activities, and access to life-enhancing
experiences that contribute to wellbeing, resilience, and personal development.
• KA Leisure memberships are available for young carers, giving them regular access to
health, fitness, and wellbeing activities within their local community and supporting them
to take time for themselves.
• Eligible young carers have been supported by Carers Gateway to apply for the ILF
Scotland Transition Fund, helping them build independence, confidence, and
opportunities to engage socially, explore interests, and become more active in their
communities.
151

Page 152

40 
• Time to Live funding, accessed via Carers Gateway, provides young carers with the
opportunity to apply for personalised short breaks—helping reduce stress, improve
wellbeing, and create positive time away from their caring role.
• To support key educational transitions, Carers Gateway actively participates in enhanced
transition planning from primary to secondary school, ensuring young carers are identified
early and their needs are understood. Young carers preparing to leave secondary school
can access a 1:1 Young Adult Carers Transition Plan, offering tailored guidance around
their caring responsibilities, available supports, future aspirations, and the move into
further education, training, or employment.
This multi-layered approach ensures that young carers are supported not only in their caring role,
but also in experiencing a balanced life, developing their potential, and moving confidently into
adulthood.  
152

Page 153

41 
Priority 5 – Inspiring children and young people to be active 
Key Highlights and Progress
Jumpstart - Child Healthy Weight Services 
During 2025–26, 40 children and young people aged 5–17 were supported through our Child
Healthy Weight programme (JumpStart) in North Ayrshire. Referrals showed a balanced gender
profile (21 male, 19 female), indicating equitable access across genders. 
Referrals were largely concentrated in early and middle childhood. Children aged 5–9 accounted
for 45% (18/40) of referrals, those aged 10–13 comprised 37.5% (15/40), and 17.5% (7/40) were
aged 14+. This reflects strong early identification through school-based pathways. 
Service delivery strongly aligns with health inequalities priorities. 62.5% (25/40) of referrals were
from the most deprived (SIMD 1) communities, with a further 20% (8/40) from SIMD 2. Overall,
82.5% of referrals came from the two most deprived quintiles, demonstrating effective targeting
of families experiencing the greatest socioeconomic disadvantage. 
Referrals were driven primarily by core health partners. School Nurses accounted for 27.5%
(11/40) of referrals, GPs for 20% (8/40), and Dietitians for 17.5% (7/40). This highlights strong
multi-agency engagement, particularly within universal and primary care services. 
66 group-based sessions were delivered within community settings. In addition, seven young
people (teens) were supported through one-to-one interventions, making use of KA Leisure
facilities. All participating children were provided with a KA Leisure card, offering a minimum of
three months’ free access to KA Leisure facilities to support ongoing physical activity and sustain
engagement beyond the intervention.
Outdoor Play 
Case Study: Children and their families have been taking advantage of updates to local
playparks in Kilwinning and Irvine. The welcomed playground upgrades have been unveiled at
Bourtreehill Playpark and Eglinton Country Park.
Each of the popular outdoor playgrounds have been assessed and upgraded by the council’s
Streetscene team and refreshed to create exciting spaces that are more accessible and inclusive
for all. Funded by the Scottish Government’s Capital funding programme with support from
Eglinton Country Park’s fund, the upgrades are the latest of several playpark upgrades across
North Ayrshire since 2021.
153

Page 154

42 
Completely revamped, the new additions to Bourtreehill Playpark, located just a few minutes’
walk from the main bus route and village include:
• An obstacle course with stepping stones, climbing stilts and rope walk
• Impressive tower slide with wobble bridge, climbing wall and low-level hammock
swinging seats
• Accessible bench for wheelchairs, strollers and prams
• Dynamic single-user dish roundabout and sculptural spinning platform
• New freestanding swing seat
• Motorbike wobble seat
• Wheelchair and stroller accessible roundabout with seating for children
• Engaging Neurodivergent games boards at main entrance
• Protective playground surface underfoot for added protection
• Re-painted and upgraded basketball court
One child shared: “I love how high up the slide is because we didn’t have one before! I really am
king of the castle!”
At Eglinton Country Park, in the main playpark children can enjoy:
• A new, impressive multi-sensory climbing dome
• Kaleidoscope-inspired sensory play boards for sensory exploration
• Low level climbing options for all abilities to hone their skills
• Wheelchair accessible toddler play corner with small slide, interactive clock and
number boards to encourage imaginary play and learning
• Improved perimeter fencing
• Neurodivergent boards for non-verbal members of our communities
Eglinton Park will welcome other improvements in the coming months as maintenance on other
pieces of equipment is currently underway. The popular playground at Eglinton Park has also
been complimented by parents and carers, with one sharing: “I like it because there’s a lot more
for the children to do now and something for all ages.
154

Page 155

43 
“It feels safe too because there’s perimeter fencing added in and the new equipment is also very
inclusive and has added variety and excitement for children visiting the country park. It’s really
nice to see it all freshened up and everyone having fun exploring the new options together.”
Improvements to the playparks are part of North Ayrshire Council’s wider investment strategy to
make all play facilities in North Ayrshire more inclusive and accessible. 
Safe Spaces for Young People
Youth work programmes continued to create safe, inclusive and purposeful outdoor spaces that
support children and young people’s physical health, mental wellbeing and social connection.
Outdoor learning remains a key delivery approach, enabling young people to build confidence,
resilience and a sense of belonging through structured, supported activity in community and
natural environments. Programmes are deliberately inclusive, ensuring access for
care-experienced young people, young New Scots and those facing additional barriers to
participation. 
The Duke of Edinburgh’s Award continues to be a cornerstone of this work, engaging large
numbers of young people in regular outdoor activity, skills development and expeditions across
Scotland. Duke of Edinburgh expeditions, day trips and overnight experiences provide
well-managed, safe environments where young people develop teamwork, leadership and
problem-solving skills while enjoying the outdoors. 
155

Page 156

44 
Alongside this, Outdoor Learning, Outdoors for Wellbeing and residential opportunities offer
accessible entry points for young people who may not engage with traditional settings, including
targeted provision for at-risk groups.
Complementary initiatives such as Gardening for Wellbeing, mountain biking, football and
outdoor creative activities further enhance safe outdoor provision by promoting routine physical
activity, positive mental health and connection to place. Gardening and nature-based activities
support emotional regulation, responsibility and mindfulness, while team sports and outdoor
challenges strengthen social connections and confidence. Together, these approaches ensure
children and young people have regular access to safe, supportive outdoor spaces that
encourage play, exploration and wellbeing, while contributing to wider prevention, participation
and achievement outcomes.
354 Children and young people participating in outdoor residential learning through DofE Bronze,
Silver and Gold awards, camping residentials and AYA residentials reported positive experiences,
supporting confidence, resilience, teamwork and personal achievement. 183 Young people
participated in CLD supported employability activity through Duke of Edinburgh Bronze and Silver
awards, including sectional achievements, and PDA in Youth Work programmes.
Active Schools and KA Leisure
Active Schools and KA Leisure have continued to work collaboratively to increase opportunities
for children and young people to be active across both school and community settings. Through
strong partnership working, we have ensured that each of the six localities has well-established
links between school-based activity and wider community provision. 
Over the past year, our joint efforts have also focused on identifying and addressing gaps in local
provision. This has allowed us to create a more equitable offer across all areas, ensuring that
every young person, regardless of where they live, has access to a broad range of activity and
sporting opportunities. As a result, the pathways from school participation into local clubs and
community sport have been strengthened, supporting smoother transitions and encouraging
sustained engagement. 
156

Page 157

45 
Furthermore, Active Schools has maintained a strong commitment to supporting young people
who face the greatest barriers to participation. 
By prioritising targeted programmes and coordinated support, we continue to ensure that those
who need our help most are able to access and benefit from positive, inclusive
sporting experiences, particularly for young people who are care-experienced, living in poverty, at
risk of disengagement, non-attenders, or otherwise identified for targeted support. 
Our overarching ambition of achieving “More Kids, More Active, More Often.” supports all schools
across North Ayrshire to deliver high-quality, inclusive extra-curricular programmes that are
accessible to every child and young person. 
Throughout the year, participation trends across our schools have highlighted the continued
popularity of several key sports. The top five most actively engaged activities were
football, netball, racket sports, dance and multi-sports, reflecting a broad range of interests
and demonstrating the strength of provision offered across our localities.
157

Page 158

46 
KA Leisure continues to deliver a broad and inclusive programme of sport and physical activity
opportunities. Working closely with communities and partner organisations, we offer a varied
calendar of term-time sessions alongside an extensive holiday programme. Our term-time offer
spans all localities, delivering more than 150 classes each week and ensuring that young people
and families have access to high-quality, community-based activity opportunities throughout the
year.  
Our annual events calendar has also continued to grow in both scale and impact. This year, more
than 5310 young people took part in a diverse programme of 75 competitive and participative
events, showcasing their skills, representing their schools and experiencing the excitement of
large-scale sporting occasions. These events play an essential role in developing teamwork,
resilience and confidence while providing memorable experiences for participants.
We have worked closely with partners to ensure pupils with additional support needs (ASN)
can participate in meaningful and appropriate competitive opportunities. This includes
supporting ASN young people to attend both the Ayrshire Sportsability events and activities
within the Scottish Disability Sport calendar. By providing tailored pathways and ensuring
representation at these events, we continue to uphold our ambition that every young person has
the chance to perform, compete and celebrate their achievements at a level that is right for
them.
158

Page 159

47 
Engagement levels have been strong. A total of 9,781 young people participated in sport and
physical activity sessions during the year—representing over 53% of the entire school-aged
population in North Ayrshire. 
This reflects both the reach of our programme and the value placed on physical activity by our
schools, families and communities. Across the year, 13,065 individual sessions were offered,
generating an impressive 271,061 participant visits. This figure illustrates the depth of
engagement within the programme: for example, ten pupils attending ten sessions each equates
to 100 recorded visits. These levels of participation highlight the consistency with which young
people return to Active Schools activities.
This year, 703 individuals contributed to the delivery of Active Schools sessions, and 98% of them
were volunteers. This represents the highest proportion of volunteer deliverers recorded
anywhere in Scotland. Their commitment, time and passion are critical to the success of the
programme. 
During the last academic year, Active Schools worked closely with 60 community sports clubs
across North Ayrshire, strengthening partnerships and increasing the breadth of provision
available to children and young people. These clubs contributed significantly to school
engagement by delivering a variety of high-quality activities, including: 
• Curriculum enhancement sessions, providing additional PE input beyond the statutory
two hours 
• Health week activities, supporting whole-school wellbeing initiatives 
• One-off taster days, offering pupils the chance to try new sports and activities 
• Visits to local clubs, helping young people experience community-based
environments 
• Promotion of club opportunities, such as distributing flyers and raising awareness of
routes into long-term participation 
In addition to this strong school-club collaboration, our North Ayrshire Community Sport Hubs
continue to thrive. Working in partnership with KA Leisure, we have provided extensive support to
local clubs, including access to training opportunities, facility provision, and tailored one-to-one
development sessions aimed at strengthening governance, sustainability and volunteer
capacity. 
159

Page 160

48 
To further enhance community engagement, we have collaborated with selected affiliated clubs
to deliver satellite club programmes, enabling more localised and accessible participation
options for young people. These satellite sessions are helping bridge the gap between school
activity and long-term involvement in community sport. 
Leadership Programmes    
At primary level, the P6 Move and Improve Programme has made a significant impact, with
1,006 pupils trained as young leaders this year. These pupils play a key role in their school
communities by planning and delivering high-quality lunchtime sport and physical activity
sessions for their peers. To strengthen the sustainability of the programme, 34 teaching staff have
also been trained, enabling them to support leadership development and ensure consistency
across all participating schools. 
In secondary schools, the Young Ambassador Programme continues to thrive, with 126 S1–S6
representatives actively championing sport and promoting the importance of being active within
their school communities. These young leaders act as role models, supporting events, raising
awareness of opportunities and helping influence positive attitudes toward sport and wellbeing.
160

Page 161

49 
Leadership development is further enhanced through the North Ayrshire Sports Academy, aimed
at senior pupils in S5–S6. This year, 147 young people took part in the programme, gaining
between 8 and 12 recognised qualifications each.  These include Saltire Awards, National
Governing Body coaching qualifications, and, at the highest level, the SQA Higher Leadership
Award. 
The breadth of accreditation provides participants with valuable skills and nationally recognised
credentials that support future education, employment and volunteering pathways.  This equates
to more than 5000 volunteer hours within schools and the wider community. This comprehensive
leadership pathway not only builds capacity within North Ayrshire’s sporting landscape but also
empowers young people with lifelong skills, confidence and a sense of civic responsibility. 
Active Girls Committees
This year marked the successful introduction of Active Girls Committees across all nine
secondary schools in North Ayrshire, representing an important step forward in promoting gender
equity in sport and physical activity.  A total of 45 motivated young leaders were appointed to
these committees, each entrusted with the responsibility of encouraging increased participation
among female pupils and helping to remove the barriers that often limit girls’ engagement in
physical activity. 
Throughout the year, these young leaders have demonstrated exceptional commitment and
maturity, acting as positive role models within their school communities. They have collaborated
closely with PE departments, Active Schools staff and wider school teams to identify areas for
improvement and to contribute to the development of more inclusive, girl-friendly environments. 
Their work has included advocating for the needs and preferences of female pupils, improving
visibility of opportunities, and championing a culture where girls feel confident and supported to
be active. In addition to their strategic contributions, the committees have played an active role
in designing and delivering bespoke girls-only programmes and events, tailored specifically to
increase engagement and create safe, welcoming spaces for participation. 
These initiatives have included lunchtime and after-school sessions, awareness campaigns,
taster activities and targeted interventions to encourage girls who may be less physically active.
The creation and success of the Active Girls Committees have strengthened the voice of young
161

Page 162

50 
women in shaping school sport, contributing meaningfully to North Ayrshire’s wider commitment
to inclusion, empowerment and lifelong participation. 
Quote: “Active Girls was one of the best experiences I’ve ever been a part of. It helped me build
strong relationships with other girls and keep those friendships going. It also improved my
communication skills and helped me feel more confident, relaxed, and able to enjoy every
moment. I loved meeting new people and learning how to encourage other girls to enjoy sport the
same way I do. I would honestly recommend this experience to anyone because it has helped me
grow as a person through sport and physical activity. One of the tasks I enjoyed most was finding
out what girls at my school liked and disliked about sport. Getting this feedback allowed me to
help make changes within the PE department so that every girl felt included and comfortable
taking part. This motivated me to get to know the girls better and understand the barriers they
face, so I can hopefully help tackle them and make sport more enjoyable for everyone.”
Quote: “I have enjoyed planning and creating change in an around sport for girls to feel more
comfortable when participating in Sport.  From my experience being in active girls for 2yrs it has
helped me develop my confidence as I know speak up and use my voice to make change for other
girls in sport.”
Care Experienced Young People 
By adopting a Whole Systems Approach, the programme supports individuals to access sport
and physical activity opportunities that contribute to healthier, more active lifestyles.  373 young
people participated in a wide range of experiential opportunities.
These experiences were diverse and engaging, including activities such as water sports,
climbing, sailing, residential trips, and community fun days. To ensure equitable access, the
team worked closely with internal and external partners to address individual barriers, including
transport, appropriate clothing, food provision, and activity access. This coordinated support
enabled seamless participation for those who may otherwise have been excluded. 
Following their initial experiential opportunity, young people were encouraged and supported to
transition into regular physical activity within their school or local community. As a result, 84%
chose to continue their involvement in ongoing sport or activity programmes. Of the 373
participants, 53% were living in the two most deprived SIMD quintiles (SIMD 1 and
2), demonstrating the programme’s strong reach into communities experiencing significant
inequality. 
162

Page 163

51 
 Appendix 1 contains the detailed action updates for 2025-26 for the Children’s Services
Plan Actions. 
 Appendix 2 contains the most recent Performance Indicator data for the associated PIs.   
 Appendix 3 contains the Whole Family Wellbeing Fund Report which covers the detailed
information associated with the fund. 
163

Page 164

Appendix 1 – Children’s Services Plan Action Updates 2025-26
Priority 1: The rights of children and young people are promoted and protected
No.  Action  Update 2025-26
1 Implement the North Ayrshire UNCRC Plan
actions, ensuring the rights of all children
and young people are protected. 
North Ayrshire Council has continued to put children’s rights at the heart of how services are planned and delivered. Staff
across the council have taken part in training to understand their responsibilities under the new UNCRC law, including a
mandatory online course. The council has also reviewed tools like the Equalities and Children’s Rights Impact Assessment
and made the complaints processes more child-friendly so young people can speak up more easily. Work to combine the
Children’s Services Plan, Child Poverty Action Plan and UNCRC Plan into one joint plan—shaped and overseen by young
people—means children’s rights are now further embedded in children's services planning and delivery.  
Children and young people have been more involved in shaping services and decisions that affect them. They have taken
part in budget consultations, contributed to health and social care planning, and influenced school and council priorities
through groups like Youth Voice and Champions Boards. The UNCRC Steering Group has supported this work by raising
awareness, providing training, and checking progress across services. Now that the group has completed its main tasks,
ongoing work to protect children’s rights will continue through existing partnerships and the new joint plan, helping make sure
all children and young people are listened to, included and protected.
2 Ensure the voices of children and young
people are heard and influence the work of
the Community Planning Partnership. 
Community Learning and Development supported 5796 young people through active citizenship and community participation
through youth forums, Joint Cabinet, Community Councils, Place Framework activity, consultations, climate workshops,
community investment activity and issue-based youth work. Engagement strengthened voice, shared decision-making and
confidence in shaping local priorities.
3 Provide opportunities for children and young
people to develop their citizenship skills,
including active democratic participation
opportunities. 
Over the year, North Ayrshire Council has continued to strengthen youth participation and rights-based practice through the
Champions Board, Executive Youth Council, Members of the Scottish Youth Parliament (MSYPs) and a range of engagement
activity. This work has supported delivery of The Promise, UNCRC duties and Council Plan priorities by ensuring young
people are informed of their rights and meaningfully involved in decision-making. Care experienced young people were
supported across all secondary schools through the Champions Board, including delivery of the What Is The Promise?
programme and strategic input from Champions Board Representatives, whose priorities were shared directly with staff and
senior leaders.
The Executive Youth Council and MSYPs met regularly throughout the year, contributing to Council engagement on key
issues including budget consultation, food insecurity, period poverty and equality campaigns. MSYPs continued to represent
young people locally and nationally, with one North Ayrshire MSYP successfully proposing a national motion on access to
free school breakfasts. Youth voice was further strengthened through large-scale engagement, including a Joint Cabinet
session with elected members and senior officers, a refreshed Joint Youth Forum model, and the annual Youth Conference
delivered during National Youth Work Week. Feedback gathered across these activities continues to inform service planning
and policy development. Significant progress was also made in embedding participation structures and children’s rights.
Young people co-produced the Pupil Voice Toolkit in partnership with Education, providing practical guidance to support
164

Page 165

2 
No.  Action  Update 2025-26
inclusive and meaningful pupil participation and delivery of Article 12 of the UNCRC. Connected Communities, alongside
Education, continued to lead UNCRC implementation through staff training, member briefings, child-friendly reporting and
direct engagement with young people, ensuring a consistent rights-based approach across Council services.
4 Equality and Children’s Rights Impact
Assessment (ECRIA) will be carried out on
all new policies that affect the lives of our
children and young people. 
During 2025/26, eight full Equality and Children’s Rights Impact Assessments (ECRIA) and seventeen pre-assessment
screening forms were completed, each assessment asks about the potential impact on protected characteristics including
age (incorporating young people) and on which Children’s Rights could be affected by any policy or proposal being reviewed
or developed. Mitigations are identified to counteract any impacts identified through the assessment process; some of the
mitigations required further research or exploration or identified other processes to reduce or negate any potential impacts. 
During 2025, six training sessions took place on how to carry out an ECRIA, each session included an overview of the
Children’s Rights process. Briefing sessions were delivered in conjunction with our legal team. We also continue to support
services by providing advice and guidance on an on-going basis in relation to completing impact assessments.
5 Through the engagement workstream of the
care experienced task force, work
proactively with Children and Young
People. 
Significant progress has been made this year in strengthening engagement with care experienced young people across
secondary schools and through wider corporate parenting work. All 10 schools now have active Champions Boards; young
people co-designed two major Promise Conferences; and the Boards continue to shape service priorities through “What
Matters to Us”. Large-scale events, including the Employability & Skills Fair, the Summer Programme, Care Experienced
Week, and the Christmas Dinner, further broadened opportunities for participation and connection. The Promise Champions
staff network has supported learning and improved Corporate Parenting practice across services. Feedback gathered from
staff and young people throughout 2025–26 will inform the refreshed Corporate Parenting Plan, ensuring it is inclusive and
grounded in lived experience.
6 Co-create with children and young people
new, systematic mechanisms for
maximising learner participation and voice
and create a new Learner Participation
Policy. 
The new Learner Participation policy and operating procedure (POP) was launched across all establishments. The Young
Leaders of Learning programme was piloted by 11 Early Years centres and schools. This programme enhanced opportunities
to maximise learner participation and learner voice across the pilot establishments.
7 Ongoing consultation with children and their
families on service design and delivery. 
Over the year, we engaged a significant number of young people through structured consultation and events to gather views
on key issues. This included the 2 Joint Cabinet event, where over 200 secondary pupils engaged directly with elected
members and senior officers on priorities such as child poverty, wellbeing, risk-taking behaviour and employability.
Engagement was further strengthened through the 3 Joint Youth Forum (almost 40 young people), the Youth Conference (94
young people), and targeted budget consultation at youth-led events.
Additional consultation was delivered through the Champions Board, engaging care experienced young people across all
secondary schools, and Primary 7 engagement, involving 114 pupils focusing on UNCRC themes including identity, language
and poverty. Feedback from all engagement has informed service planning, strategy development and policy discussions,
ensuring young people’s views are embedded in decision-making at local and strategic levels.
8 Ensure that Children’s engagement forums
focus on rights, helping children and
Over the year, UNCRC principles were embedded through targeted consultation and participation activity with children and
young people. Engagement included 114 Primary 7 pupils participating in Youth Council workshops exploring key UNCRC
165

Page 166

3 
No.  Action  Update 2025-26
families understand UNCRC and what this
means. 
articles, including Article 8 (identity), Article 26 (child poverty), Article 27 (risk-taking behaviour) and language and inclusion
(Article 30). Feedback gathered informed service planning and was shared with partners.
Care experienced young people were engaged through the Champions Board across all 10 secondary schools, with delivery
of the What Is The Promise? programme supporting awareness of rights and The Promise. Young people identified priorities
through structured engagement, which were presented directly to staff and senior leaders to inform corporate parenting
practice.
Strategic consultation also took place through large-scale engagement events, including a Joint Cabinet session involving
over 200 secondary pupils, where young people shared views on poverty, wellbeing, risk-taking and employability with
elected members and Chief Officers. Additional UNCRC-aligned engagement was delivered through the Joint Youth Forum
and Youth Conference, ensuring children and young people’s voices informed policy development, service redesign and
decision-making across the Council.
9 Work with local partners/members to
identify opportunities for children and young
people to become involved locally. 
Throughout the year, strong partnership working with Education, Alcohol and Drug Partnership (ADP), Police Scotland,
extended outreach services and third-sector organisations has supported increased opportunities for children and young
people to become involved locally. Joint approaches enabled young people to engage meaningfully on issues such as
substance use, risk-taking behaviour, wellbeing, child poverty and safeguarding. This partnership approach was evident
through strategic engagement including the Joint Cabinet event, Joint Youth Forum, Youth Conference and targeted outreach
activity, providing young people with direct access to elected members, senior officers and partner services. Collaborative
working has strengthened early intervention, widened participation and ensured young people’s views are embedded in local
decision-making, service planning and community responses across North Ayrshire.
10 Through our Advocacy Strategy prioritise
community-based advocacy to children and
young people ensuring they are aware of
their rights and are appropriately
represented. 
Independent, community based, advocacy continues to be provided via Barnardo’s Hear 4U service.  It provides one to one
advocacy to children and young people from North Ayrshire and priority is given to children and young people, who:
• Are involved in the Child Protection process and/or Children’s Hearing system
• Are care experienced in Foster Care, Residential Care and/or Kinship Care
• Are on the periphery of Secure Care
• Were previously looked after and accommodated
• Have additional support needs
They continue to support young people to ensure they are aware of their rights, as defined within the United Nations
Convention on the rights of the Child (UNCRC).  They are committed to ensuring that the voices of children and young people
are heard, in a way which builds their confidence, also ensuring that they are listened to and their rights are appropriately
represented, when decisions are made
11 Implement learning and improvements
identified through the HSCP SDS Learning
Phase 1 activity is largely complete. The SDS Policy has been finalised and accompanying SDS Practice Guidance has been
completed to support consistent and proportionate application in practice. A North Ayrshire Directory of Services has also
166

Page 167

4 
No.  Action  Update 2025-26
Review Board for the Children with a
Disabilities Team. 
been produced to support signposting. The SDS website has also been fully developed and is now live, providing updated
and accessible information for children and families, adults and practitioners. 
Work is at the final stage in relation to Level 1 SDS Awareness and Training. Further development work is still required in
relation to the ethical care framework to ensure full alignment with SDS principles and revised operational practice under the
Eligibility Policy.
12 Include young carers in the planning and
shaping of their services. 
A peer-led approach, such as the Young Carers Champions Boards now being delivered across all secondary schools,
creates meaningful opportunities for young carers to influence decisions that affect them. These initiatives amplify young
carers’ voices and ensure that a diverse range of experiences is represented, including those of young carers from minority
ethnic backgrounds, LGBTQ+ communities, and young carers who have their own disabilities or health needs.
13 Develop a young people users forum for KA
Leisure and ensure their views and opinions
are considered when developing
programmes and initiatives. 
Delay in implementation due to a governance review.  Following recent board approval, the panel will be established in
2026/27. 
Priority 2: Acting early to improve what happens next
No.  Action  Update 2025-26
14 Work with our partners to keep all children
and young people safe, with the robust
implementation of the new National
Guidance for Child Protection. 
In collaboration with our Pan Ayrshire Colleagues, the North Ayrshire Child Protection Committee have developed the Ayrshire
Child Protection Procedures. These procedures were updated following the publication of the National Guidance for Child
Protection, 2021 (updated 2023). Changes in North Ayrshire practice have been embedded in accordance with the guidance
across the partnership and are reviewed via the Management Information Sub-group and Evaluation and Improvement Sub-
group of the Committee. 
15 Support families with children aged 0-5
through our integrated universal early
years’ service. 
There are over 5000 children aged 0-4 years in North Ayrshire, all of whom are supported by either a Health Visitor or a Family
Nurse.  In addition to following the nationally agreed Universal Health Visiting Pathway from the antenatal period through to a
child commencing school, within North Ayrshire, children under 5 and their families continue to have access to additional
support from the wider, integrated early years team.  During 2025/26 (as at 17 March 26), 730 requests for assistance from the
various members of the integrated team were made.  This included:
• 461 (83.6%) for Health Visiting Support Workers for areas such as communication, sleep, toileting, infant feeding and
behaviour
• 64 (8.8%) for the Perinatal Wellbeing Team, supporting new and expectant mums experiencing low level mental health
difficulties
• 60 (8.2%) for the Family Nurturers who offer support around bonding and attachment, routines, home conditions and
community integration
• 57 (7.8%) for Early Years Social Workers supporting with domestic violence, parental mental health difficulties amongst
others
167

Page 168

5 
• 38 (5.2%) for specialist infant feeding support
• 29 (4.0%) for support to dads via our partnership with national charity Dads Rock
• 19 (2.6%) for the Healthcare Support Worker who provides additional support to the Perinatal Wellbeing Team as well
as baby massage
16 Increase access to early learning and
childcare. 
The 1140 funded hours continue to be delivered with flexibility and choice for parents across localities. Our models offer a
blend of full year and term time places with various patterns in establishments delivering 8am-6pm and 9am – 3pm. Allocations
have taken place for session 25-26 and 85% of parents have been offered their 1st choice for establishment. Work is continuing
to raise awareness of eligibility and increase the uptake of eligible 2s.
17 Work together with parents or carers to
provide support to their children. 
We have continued to roll out the Building on Positive Relationships Families groups. This financial year 17 groups have taken
place with 22 families taking part. All participants have reported that the programme was either extremely useful or very useful
and it has had a positive impact on family life.
18 Improve outcomes for care-experienced
young people. 
Our Brighter Pathways transformation programme to improve outcomes and opportunities for care experienced children and
young people has been progressing since April 2024. The transformation and service developments were delivered through
focussed workstreams on the following areas: 
1. Housing and Throughcare 
2. Fostering and Kinship 
3. Education including Residential School Placements 
4. Internal Children’s Houses – Model of Care 
5. Early Intervention & Intensive Family Support 
6. Strategic Needs Assessment/Data/Workforce 
7. Best Practice Models and Research 
The Brighter Pathways work has involved all corporate parents which has assisted in a shared awareness of the challenges
and opportunities to improve the provision of services for families, looked after children and care experienced young people.
Progress during 2025-26 has included:
1. Our supported accommodation model of care is nearing completion with a proposed opening date of Summer 2026. This is
designed to increase independence whilst maintaining relational support on a phased and gradual basis, rather than young
people experiencing the cliff edge of transitioning to adulthood which they often talk about
2. Fortnightly planning meetings are taking place to discuss matching young people to the supported accommodation. 
3. A new Fostering Scheme has been introduced, effective from 1st April 2026 to help retain current foster cares and
encourage new foster carers. This will support placement stability by increasing retention of current experienced carers
alongside strengthening approaches to local recruitment, reducing reliance on external provision (which is more often than
not, not local). 
4. The Moving on Forum has been implemented to encourage multi agency working between Throughcare and Housing. The
Forum has improved coordination between Housing and Throughcare, with reduced delays in accommodation making
decisions resulting in more predictable and better planned transitions for care leavers.  This joint approach has helped
mitigate impact of increased housing pressures by ensuring earlier planning alongside shared ownership this has resulted
in day-to-day collaboration across Throughcare, Housing, internal children’s houses, fostering and kinship services. 
168

Page 169

6 
19 We continue to develop and implement the
Childsmile programme, focussing on early
referral and preventive advice for all
families. 
In 2025 along with all boards in Scotland, NHS Ayrshire and Arran embarked on a programme to reorientate the Childsmile
programme. This included changing how the Fluoride Varnish programme is delivered in educational establishments. The team
are working to an action plan which is reported through the Oral Health Improvement Plan. Additionally a review of the Dental
Health Support Worker programme has provided a clear direction for improving this service working alongside health visiting
colleagues and other stakeholders. 
20 We will continue to deliver Jumpstart, a
family centred healthy lifestyle programme
for children aged 2-17, who are above a
healthy weight. 
During 2025/26, 40 children and young people aged 5–17 were supported through our Child Healthy Weight programme
(JumpStart) in North Ayrshire. Referrals showed a balanced gender profile (21 male, 19 female), indicating equitable access
across genders. Referrals were largely concentrated in early and middle childhood. Children aged 5–9 accounted for 45%
(18/40) of referrals, those aged 10–13 comprised 37.5% (15/40), and 17.5% (7/40) were aged 14+. This reflects strong early
identification through school-based pathways. 
Service delivery strongly aligns with health inequalities priorities. 62.5% (25/40) of referrals were from SIMD 1 communities,
with a further 20% (8/40) from SIMD 2. Overall, 82.5% of referrals came from the two most deprived quintiles, demonstrating
effective targeting of families experiencing the greatest socioeconomic disadvantage.  Referrals were driven primarily by core
health partners. School Nurses accounted for 27.5% (11/40) of referrals, GPs for 20% (8/40), and Dietitians for 17.5% (7/40).
This highlights strong multi-agency engagement, particularly within universal and primary care services. 
During the reporting period, 66 group-based sessions were delivered within community settings. In addition, seven young
people (teens) were supported through one-to-one interventions, making use of KA Leisure facilities. All participating children
were provided with a KA Leisure card, offering a minimum of three months’ free access to KA Leisure facilities to support
ongoing physical activity and sustain engagement beyond the intervention.
21 Expand our peer support service to all
breastfeeding mothers as part of our
integrated infant feeding service working
alongside the Breastfeeding Network. 
From 1st July 2025, The National Childbirth Trust took over the contract with the third sector to provide postnatal breastfeeding
support to all women who were breastfeeding on discharge from Ayrshire Maternity Unit. Between 1st July - 31st March, 1,331
breastfeeding women engaged in the support offered. Of those, around 50% were exclusively breastfeeding at 6-8 weeks. 
22 Continue working with whole families,
whole systems and whole communities to
provide early intervention support to all of
North Ayrshire’s Children. 
Through Safer Choices, Safer Futures, continued progress has been made in working with whole families, whole systems and
whole communities to provide early intervention support for children and young people across North Ayrshire. Partnership
working with Education, ADP, Police Scotland, extended outreach services and the third sector has strengthened joined-up
responses to identified risks, enabling support to be offered at the earliest possible stage. This whole-system approach has
focused on prevention, relationship-based practice and community engagement, ensuring that children, young people and
families receive the right support at the right time. By aligning universal services with targeted interventions, Safer Choices,
Safer Futures continues to support positive outcomes, reduce escalation of need and promote safer, healthier communities.
23 Providing training/guidance to families,
schools, partners and communities that
enhances the understanding of early
intervention and provides skills needed for
families to feel confident and equipped to
manage family life. 
1801 children and young people engaged with programmes delivered by the Mental Health and Wellbeing Project Delivery
Officers. These activities prioritise supporting children and young people to develop ways to keep mentally well and promotes
positive wellbeing practices. Examples of programmes delivered include, Drama for Wellbeing, Outdoors for Wellbeing,
TakeTime Families and Your Resilience at The Hive in Ayrshire College. The BounceBack programme continues in Primary
169

Page 170

7 
Schools with one young person aged 11 reporting “I liked the resilience exercise, I learned to believe in myself and try not to
give up.”
The CLIMB programme has been introduced in Secondary Schools where young people develop skills to positively manage
their mental wellbeing and also gain some qualifications. Staff involved report substantial improvements in several areas
including - Confidence and Self-Belief, Emotional Regulation and Wellbeing and Social Skills and Teamwork.
Please see response to No. 15 and No 17.
24 We will implement the Signs of Safety
approach to social work practice. 
Signs of Safety was launched in North Ayrshire HSCP in 2023 and now is fully embedded into professional practice. Signs of
Safety (SoS) is described as an approach “to enable children's services to deliver services with a rigorous focus on child safety
and wellbeing, and to set up their practice, policy, procedures and organisation so that the practitioners can do everything
possible to put the parents, children and everyone naturally connected to the children at the centre of the assessment and
decision-making”.  Implementation has included briefings to CPC members, 5-day training for HSCP Social work children and
families staff, baseline audit work and realignment of paperwork. 
In June 2025 an audit was undertaken. Activity involved a random sample across all open social work Children and Family
cases on which at that point were 956. Within this audit, 10% of parents /carers of all open cases in children and families’
teams were interviewed and 70%-84% of the cohort interviewed felt that their workers show care, spend time with the children,
help solve problems, recognise strengths within the family and are following through on actions. This is very positive feedback
and an excellent base from which to build and improve practice. There is strong evidence from the responses gathered from
children and young people that they feel listened to (63%), feel their social worker helps them (69.5%), feel their social worker
knows their family (76%) and 71% of the children and young people interviewed feel they have a say in what happens to them.
This data provides strong indications that there are positive working relationships between families and practitioners. Given
how important working relationships are in evoking change for children this is an excellent starting point for implementation.
25 Improve planning for transitions of care to
ensure children and young people are able
to thrive moving into adulthood. 
A series of Short Life Working Groups (SLWGs) were completed between September and December 2025.  The SLWGs
looked at areas including resource allocation, Self-Directed Support, eligibility criteria and assessment formats.  The conclusion
of these groups provided actions to drive forward for future implementation.  The following will be taken forward:
• One resource allocation group for children with disabilities and adult learning disabilities.
• Revise the current SDS model to bring up to date the budget structure.
• Re-write the eligibility criteria for an All-Age Disability Team.
• Continue to use Signs of Safety in CFDIS, however, to review the current paperwork format as was in period of
review.  Not to use the Signs of Safety Pathways Assessment as a transition assessment.  Seek to move towards the
use of GIRFE for transition and adult LD assessments.
Since these decisions were agreed, changes outwith our control has meant that there are further amendments to make. Social
Work Scotland Self Directed Support Children's Peer Space has provided a draft Scottish Government document which moves
away from indicative budget-based supports to needs led.  Further work is now required in relation to our current model.
170

Page 171

8 
26 Invest in premises infrastructure to support
children and young people experiencing
distress in appropriate environments. 
The service approach is strongly aligned with the core principles of the Bairns’ Hoose national model. This includes a
commitment to trauma-informed practice, ensuring children do not have to repeatedly retell their experiences, and providing
coordinated, multi-agency support that prioritises safety, dignity and wellbeing. 
Joint Investigative Interviews (JII) and the Scottish Child Interview Model (SCIM) – Staff trained in SCIM undertake interviews
using trauma-informed, child-led approaches designed to reduce distress, support memory accuracy and uphold children’s
rights throughout the justice process. This ensures that the child’s voice is captured safely and respectfully, while supporting
improved investigative and decision-making outcomes. The alignment between SCIM, JII and Bairns’ Hoose principles means
that our workforce is already operating within the national direction of travel. We have established processes that reduce
duplication, strengthen cross-agency communication and ensure that children have access to advocacy, therapeutic support
and a consistent professional network. As the local Bairns’ Hoose model becomes fully operational, these foundations will
enable seamless integration, ensuring that children’s journeys through care, protection and justice pathways remain centred on
participation, protection and recovery.
27 Work across partners to develop robust
pathways of support for infants, children
and young people and their families
seeking support for speech, language and
communication development support. 
North Ayrshire Early Language Network group meets regularly to share information about supports available to children, young
people & families seeing support for Speech, language and Communication (SLC).  Health, education, early years social work,
Family Nurse Partnership, 3rd sector representative are part of the network.  
Communication Champion Network in Early Years in North Ayrshire link closely with the SLT team and as a group quarterly to
share practice.  Communication Champions have received additional training from SLT to identify children who may require
targeted support in early year, can share resources with parents and signpost them to SLT helpline and in person drop in
session with SLT. A Social Communication in person drop in runs monthly.  Any family with a concern about their child's social
communication or activities for daily living can receive advice.
The NHS Ayrshire & Arran Children's speech and language therapy Facebook page and app contains information for families
and practitioners to access with many activities to help support children's speech, language and communication.
There is a Helpline available for anyone with a concern about a child's speech, language and communication.  They can speak
to a registered Speech & Language therapist and receive advice and resources. Annual meetings with our Health Visitor
colleagues ensure that they are familiar with the SLT pathways and build relationships with colleagues. 
28 Improve access to Speech and Language
therapy for children and young people who
require specialist support. 
If families contact us through the helpline or attend an in person drop in with Speech and Language Therapy (SLT), they will
receive advice and resources from the service.  If a Request for Assistance is required because the child needs a complex SLT
assessment they will be added to the waiting list.  While the child is waiting for this complex SLT assessment the family will be
offered support at a targeted level.  They can continue to access the in person drop in, they may be offered a one off assistant
demonstration session, for example, on Makaton. 
29 Develop a trauma informed workforce by
rolling out trauma aware and trauma skilled
resources
North Ayrshire Health and Social Care Partnership has invested in providing the majority of trauma informed training on a face-
to-face basis. At this moment in time, many other organisations are relying on an online format. The positives of providing
training in this manner is that staff are having the opportunity to have the discussions around what is working and what is not.
This is crucial for services to start the process of looking at where changes need to occur. In partnership with Connected
171

Page 172

9 
Communities we have developed a guide on Trauma informed Language for staff within the residential care setting. This has
involved working with young people on how language has impacted them and what they would like to see improved. This
informed training for residential staff along with a guide on language use. This has been rolled out to Canmore Children's
House, but it is hoped that the other three houses will also get involved. Additional trauma inputs also take place for all newly
qualified social workers and student social workers. Input is now also incorporated into the 5-day Child Protection Training
Course.
Education’s recently launched Supporting Relationships and Behaviour Policy and Professional Learning Programme supports
the development of a trauma-informed workforce by providing a clear, graduated pathway from Trauma Aware to Trauma
Skilled practice across universal, targeted and intensive levels. Universal professional learning, including CALM Theory, New
Authority, Emotion Coaching, Expectations and Consequences develops workforce awareness of the impact of trauma, stress
and adversity on relationships and behaviour, establishing a shared relational, compassionate and preventative approach that
prioritises safety, predictability and emotional regulation. Targeted and intensive elements, including Positive Behaviour
Support, CALM Physical Intervention, re-accreditation and structured train-the-trainer delivery with ongoing locality-based
coaching, deepen the ability of education teams’ to respond safely and in a neuroaffirming way to dysregulated behaviour using
low-arousal, dignity-preserving and trauma-informed strategies. Sustained coaching, peer reflection and access to national
trauma, nurture and relationships-based resources ensure practice is embedded, consistent and reflective, supporting team
wellbeing and resilience while enabling children and young people to experience emotionally safe, regulated and supportive
learning environments.  
Develop an evaluation framework to
maximise resources to support children and
young people, to enable system partners to
invest and sustain early intervention
approaches. 
A monitoring and evaluation framework has been developed to support implementation of the Whole Family Wellbeing Fund. 
All funded elements provide 6 monthly reports setting out how they are meeting the aims and outcomes of the WFWF,
involvement and impact on children, young people and their families, and sustainability.  This is in line with the annual Scottish
Government reporting expectations.
31 Reach and identify all young carers earlier
in their caring role and promote increased
uptake of Young People’s Carer Support
Plans. 
We are committed to identifying young carers earlier in their caring journey and increasing the uptake of Young Carers
Statements. Significant progress has been made across education settings to embed consistent, meaningful support.
• 15 local primary and secondary schools have now signed up to the Young Carers Covenant, ensuring that young carer
awareness and tailored support are embedded into school culture.
• The number of Young Carers Statements offered and accepted across education continues to grow, reflecting stronger
identification pathways and increased confidence among staff in recognising and supporting young carers.
• A comprehensive Young Carers Education Information Pack has been developed to strengthen professional
understanding and enable a consistent approach to support.
• Young Carer Statement training sessions have been delivered for both education and HSCP staff, helping ensure that
statutory duties are met and support is personalised and meaningful.
• Carers Gateway Young Carer staff now able to offer and complete Young Carers Statements where appropriate. 
• Through collaborative work, Carers Gateway and local schools have established a shared working agreement,
reviewed annually, which sets out mutual goals for identifying and supporting young carers. These may include:
o Regular group sessions within schools
172

Page 173

10 
o Dedicated one-to-one support for young carers
o Developing a Young Carers Charter tailored to each school
o Awareness-raising activities for pupils, families, and staff
o Providing targeted resources for each school’s needs
o Support during key transition points, including P7–S1 and the move to post-school destinations
This collaborative, prevention-focused approach ensures young carers are identified earlier, understood better, and supported
in ways that make a genuine difference to their wellbeing and educational experience. 
Priority 3: Making things fairer
No.  Action Update 2025-26
32 Implement the North Ayrshire Child Poverty
Action Plan. 
Significant progress has been made this year in strengthening governance, delivery and system change to reduce child poverty
in North Ayrshire. Child poverty is now embedded as a core priority of the Community Planning Partnership, strengthening
strategic oversight and accountability. The Child Poverty Strategy Team, initially established through Fairer Futures Partnership
funding, is now fully embedded and staffed through permanent roles, providing sustained leadership and coordination across
partners.
The No Wrong Door approach has transferred into the Child Poverty Strategy Team, ensuring closer alignment with strategic
objectives. Fairer Futures Partnership activity has prioritised co-designing place-based tests of change with third sector
partners and community members with lived experience as equal partners. This has led to the creation of new third sector
posts within co-identified priority communities and the commencement of feasibility work on a community directory to improve
access to local supports and services.
A new Project Board has been established in recognition of the intersectional work and impact of child poverty, and to drive
delivery at pace across three priority workstreams: Single Shared Assessment, No Wrong Door, and Data and Evidence. This
structure will enhance collaboration, reduce fragmentation and improve the targeting of support.
The Welfare Rights in Schools project expanded significantly during 2025–26, with three Welfare Rights Officers embedded
across all educational establishments, including early years centres. Schools have provided trusted, stigma-free access to
advice, enabling early intervention. During the year, the project secured £1.5 million in financial gains, with 240 families
achieving positive outcomes. Continued funding is required to sustain and further develop the model, including testing more
intensive support in selected schools.
173

Page 174

11 
No.  Action Update 2025-26
Across its first two years, the Child Poverty and Early Intervention Fund has now committed over £1 million, supporting both
direct financial relief and innovative, co-designed test-of-change initiatives. This includes investment in integrated data through
Smart Data Foundry and piloting a Family Enterprise Programme in partnership with Ayrshire College.
Youth participation has been strengthened through engagement with the P7 Youth Council and Joint Cabinet, while modern
apprentices have shaped the content of family friendly versions of the 24/25 Child Poverty Progress Report. 
Looking ahead, the development of the joint Children and Families Plan brings together children’s services, child poverty and
UNCRC statutory duties. A focused youth panel with scrutiny and oversight responsibilities will be established as a key
component of governance to ensure actions and implementation accurately reflect the needs of the communities they are
intended to serve.
33 Improve attainment and achievement for all.  There has been a focus on raising attainment for all children and young people across session 2025-26, including: 
• Key discussions and planning of attainment priorities with senior leaders across Early years, Primary & Secondary
• Use of data for improvement, raising attainment and closing the poverty-related attainment gap
• Relevant and purposeful uses of Play in EY and Primary
• Involvement in the CYPIC National Writing programme for Achievement of a Level in Writing 
• Professional learning delivered by NAC Professional Learning Academy
• Target-setting and monitoring of progress towards targets through attainment meetings across all 3 sectors
• Focused and targeted support from Education Scotland Attainment Advisor
• Data clinics for staff across all 3 sectors to support improved use of data to raise attainment
• Embedded use of approaches and tools to gathering and analysing attainment data in Literacy and Numeracy from
Early Years to S3, including input from EY Funded Providers and Childminders
• Analysis of Senior Phase data with Secondary senior leaders to provide key priorities for next academic session
• Looking outwards at national level as well as sharing strategy nationally
• Development of a NAC Reading Programme which will begin to be implemented in academic session 2026-27
34 Close the poverty related attainment gap.  Rigorous analysis of data for improvement at all levels includes a focus on closing the poverty-related attainment gap and how
educational establishments can support those children and young people most affected by poverty.  With 46% of learners
residing in SIMD Q1, Education Service priorities ensure that universal approaches to improving learning, teaching and
assessment, as well as raising attainment, allow a focus on approaches to closing the gap.  
Strategic planning and spending of Pupil Equity Funding by schools allows for focused and targeted interventions and supports
for learners most affected by poverty, with input focused on Health and Wellbeing, Literacy and Numeracy.  Quality assurance
of this is included in annual PEF impact reports as well as Improvement Plans and Standards and Quality reports.  Senior
Education Authority staff attended national events on Scottish Attainment Challenge and PEF and delivered input to highlight
effective practice in NAC schools.
174

Page 175

12 
No.  Action Update 2025-26
There remains a commitment in schools and in the Education Service to mitigating against the Cost of the School Day, with
approaches such as uniform banks, Prom dresses and low/no cost trips and excursions.
35 Implement the recommendations from the
Independent Care Review (Scotland), The
Promise. 
We are fully committed to #KeepThePromise which provides a benchmark for corporate parents, carers, practitioners,
managers, care experienced community, and decision makers in fulfilling the goal to meet the collective and individual needs of
all of our Care Experienced infants, children and young people. 
A staff Promise Conference was held on 20th January 2026 and brought together care experienced young people, senior
leaders, operational managers, and corporate parenting partners. The event focused on reflecting on our responsibilities as
corporate parents, strengthening commitment to The Promise, and gathering staff voice to inform the Corporate Parenting Plan
refresh. 
In November 2025, we held our annual joint Champions Board Conference, attended by 9 out of 10 schools and 59 young
people. The conference was co-designed with young people and focused on themes they identified as important, including:
 Understanding The Promise
 Using their voice safely and powerfully
 Building connections with peers across schools
 Planning the Summer 2026 Programme
Their views from the day have been captured in the “What Matters To Us” poster, identifying the six shared young people’s
priorities: 
 Feeling Safe and Secure 
 Trust and Relationships 
 Having a Voice and Being Listened To 
 Friendships and Social Connections 
 Opportunities and Aspirations 
 Understanding and Respect
Together, this provides a summary of what matters most to our care experienced young people and will directly inform the next
Corporate Parenting Plan.
The HSCP and multi-agency partners continue to promote and implement The Promise locally. The Corporate Parenting
Steering Group continues to meet quarterly to drive the work of the Corporate Parenting Action Plan which captures all activity
associated with The Promise. The action plan has been aligned with the 5 key foundations upon which The Promise is built -
Care, Voice, Family, People and Scaffolding.
36 Implement the recommendations from the
Additional Support for Learning Review
(Scotland). 
Educational Psychology Service continues to contribute to recommendations from the ASL review, building workforce capacity
through trauma-informed, inclusive professional learning and coaching, strengthening inclusive leadership, mindsets and
practice, improving attendance and participation, and securing equitable outcomes for neurodivergent learners through
consultation , assessment, intervention and research. 
175

Page 176

13 
No.  Action Update 2025-26
37 Build strong collaborative partnerships in
local areas to ensure we deliver high-quality
services for all of our children, young
people, and families. 
Rosemount: The Rosemount Crisis Service has built strong collaborative partnerships across North Ayrshire by operating as a
highly integrated, multi-agency service focused on supporting children and young people with complex needs and significant
levels of risk, with the clear aim of keeping children safely at home with their families and out of local authority care wherever
possible.
The service mainly works with the four Children & Families Social Work teams in North Ayrshire - but also accepts referrals
from the Families for Children, Children & Families (Disabilities), Kinship and Young Person Support teams - and plays an
important role in the wider multidisciplinary response to family crisis, escalating risk, and instability. Rosemount is embedded
within statutory planning and decision-making processes and contributes to Child Protection processes and plans, Looked After
and Accommodated Children (LAAC) processes, Children’s Hearings, and wider young person protection pathways, including
Vulnerable Young People (VYP) and CARM arrangements.
Partnership working extends beyond social work to include Education, CAMHS, Police Scotland, health services, and
community-based supports, ensuring that children and families receive a holistic, coordinated, and responsive service. This
integrated model enables Rosemount to respond effectively to overlapping issues such as family breakdown, distressed
behaviour, trauma, school non-attendance, mental health concerns, and contextual risks.
A key measure of the service’s impact is its consistent success in keeping over 90% of the children involved with the service
each year out of local authority care. This demonstrates the effectiveness of intensive, relationship-based crisis intervention
when delivered in close partnership with families and professionals. Rosemount’s collaborative approach strengthens risk
management, improves family functioning, and creates the conditions for safer, more stable home environments.
Overall, the service’s strong local partnerships are central to delivering high-quality, child-centred, and family-focused support,
ensuring that children and young people with the most complex needs receive the right help at the right time, while reducing the
likelihood of escalation into care.
Family Centred Wellbeing Service: The Family Centred Wellbeing Service (FCWS) has built strong, effective partnerships
across North Ayrshire by embedding a whole-system, relationship-based approach to early intervention and family support.
Working collaboratively with education, health, social work, and a wide range of third sector and community partners, FCWS
ensures that children, young people, and families receive coordinated, holistic support that responds to complex and
interconnected needs. Practitioners actively engage in multi-agency planning, including Team Around the Child (TAC)
processes, and play a key role in bridging gaps between services, advocating for families, and improving communication
across the system.
176

Page 177

14 
No.  Action Update 2025-26
Partnerships are also shaped by the needs and voices of children and families, with flexible approaches that connect
individuals to supports aligned with their strengths, interests, and circumstances, including community-based opportunities that
promote inclusion and reduce isolation. This collaborative model has contributed to tangible improvements in outcomes,
including:
• improved school attendance and engagement,
• increased emotional wellbeing and confidence,
• strengthened family relationships and parenting capacity, and
• improved access to mental health, financial, and community supports.
By working in this integrated and responsive way, FCWS has strengthened local service delivery, enhanced access to early
support, and contributed to preventing escalation to crisis or statutory intervention - particularly for families experiencing the
greatest levels of disadvantage.
An example of this is the first year of joint delivery of the SCQF level 5 Performing Engineering Operations Award between
NAC Education Service and Ayrshire College.  Learners from over 5 different NAC Secondary schools are taught the course at
Ardrossan Academy and Ayrshire College, resulting in an increased number of pupils being able to access the course.  other
benefits have been upskilling of school staff in the delivery and assessment of the Award, improved partnership working with
the College and a direct link to opportunities within the Ayrshire Growth Deal.
38 Create a new 3 year Raising Attainment
Strategy. 
Raising attainment continues to be a focus for all schools and Early Years establishments, with a commitment to ensuring
added value across and through all 3 sectors in a child’s learning, attainment and achievement.  
Senior leaders’ feedback and the Data Service Improvement Group have helped to shape a refreshed approach to collecting
Literacy and Numeracy data and how this is then used to create targets for all establishments.
A more focused approach in analysing attainment data is helping to shape Service priorities and collaborative working between
central staff and schools to ensure that all learners attain and achieve their best outcomes.
39 Maximise opportunities to work with Third
Sector providers to provide early
intervention and prevention supports, with a
particular focus on primary prevention
approaches. 
Through Whole Family Wellbeing Funding, the Children’s Services Strategic Partnership has awarded grants to third sector
organisations during this financial year with the aim of testing or expanding early intervention projects which support a whole
family approach.  Some of these projects include support to kinship families, transition support to young people with additional
support needs and support to dads.
Through Children and Young People’s Community Mental Health and Wellbeing Funding, small grants have been awarded to a
range of Third Sector partners. Examples of programmes include, using judo to promote wellbeing, KA Leisure have developed
programmes and work in collaboration with schools, nature based programmes, and programmes that promote financial
stability.
177

Page 178

15 
No.  Action Update 2025-26
40 Providing a robust ‘peer’ support model that
upskills parents and carers, providing
training and volunteering opportunities and
enhances employability skills as well as
building self-esteem and confidence. 
In 2025/26, the Employability service has registered 811 new parents who are engaging, developing skills, confidence, and
resilience to secure and sustain employment in the future. In this period 85 parents have secured paid work experience through
placements created from the Skills for Life initiative.  We Work for Families have supported 134 parents to progress to
sustainable employment as well as increasing their household incomes.  Two new Peer Navigators have been recruited to
engage and support parent to engage in training, volunteering and the range of opportunities provided by Your Next Move
Working North Ayrshire to prepare people to progress to employment.
41 Take an asset-based approach to
communities/children and families and build
upon the skills and strengths that exist. 
North Ayrshire has been implementing Safe and Together since 2021, a model which is designed to improve our practice and
how we work together with families where there is domestic abuse and concerns about children. 
42 Establish a Financial Inclusion Partnership
in North Ayrshire to better support access
to support for families. 
Our 2025 ambitions to deliver services through an Advice Line and a single point of contact are now fully embedded. Client-
centred outcomes surveys are routinely issued at case closure, strengthening our understanding of impact and ensuring
continual service improvement. In-house debt advice is fully operational, providing seamless access to both debt and welfare
rights support across all tenures.
The Financial Inclusion Partnership Communications Subgroup was established during the year and successfully delivered the
Partnership’s first multi-agency event in October. The event, themed around winter preparedness, brought together a range of
services with the aim of increasing awareness of support available across North Ayrshire and improving understanding of how
services connect and refer between one another. Workshops were delivered by Citrus, Community Link Workers and
Christians Against Poverty (CAP).
The Financial Inclusion Partnership continues to grow and strengthen, with new members joining throughout the period.
Collaborative working with third sector organisations and partner agencies remains central, with a shared focus on developing
clear referral pathways and delivering coordinated, joined-up support for residents.
43 Develop peer support models.  The Modern Apprenticeship programme is being used as a peer support model by creating visible, relatable role-model
opportunities for young people within their own communities. Apprentices, many of whom have lived experience of local
challenges, support younger peers through informal mentoring, shared learning and positive role-modelling, helping to build
confidence, aspiration and engagement. By positioning apprentices within community and youth work settings, the programme
supports peer-led learning, early intervention and prevention, enabling young people to access advice, reassurance and
support from someone they can identify with. This approach strengthens relationships, promotes positive behaviours and
supports children and young people to make safer choices, while also building skills, confidence and progression routes for the
apprentices themselves.
44 Strive for parity of access to support and
services for our Island Communities
including for Children and Young People. 
Work has continued to strengthen equity of access to youth work support and participation opportunities for children and young
people in North Ayrshire’s island communities. Partnership working with Arran Youth Foundation has supported the
development of a local youth work offer on Arran, ensuring provision is responsive to local need while remaining connected to
wider Council priorities. Island communities are routinely included in all youth voice structures and engagement activity,
including the Youth Council, Joint Cabinet events and wider consultation processes, ensuring young people from Arran have
178

Page 179

16 
No.  Action Update 2025-26
opportunities to influence local and strategic decision-making. The appointment of an MSYP from Arran has further
strengthened parity of access, enabling regular feedback from island young people and ensuring their views are represented
consistently at both local and national consultations.
45 Provide multiple points of access for young
carers into carer support services. 
We are committed to ensuring that young carers can access support in ways that are flexible, familiar, and responsive to their
needs. A range of access routes has now been embedded across education and community settings, ensuring no wrong door
to support.
• Dedicated Young Carers Champions are now in place within every primary and secondary school. These Champions
act as a first point of contact for identification, support, and information-sharing within their school communities.
• Three Young Carer Workers are aligned to clusters of three secondary schools and their associated primary schools.
This structure ensures consistent partnership working, proactive engagement, and timely support for young carers and
their families.
• A termly Young Carer Newsletter is shared with education staff, providing updates on supports available, upcoming
events, awareness activities, and practical resources for working with young carers. This helps maintain visibility and
ensures staff remain informed throughout the year.
• An upgraded Carers Gateway digital self-help portal for young carers was launched in August 2025, offering 24/7
access to a wide range of information, resources, wellbeing tools, and guidance. The platform significantly enhances
accessibility - enabling young carers to seek help at any time, in a format that suits them.
Together, these access points ensure that young carers can engage with support through trusted adults in school, dedicated
staff, digital tools, or wider community activities. This blended model strengthens early identification, reduces barriers, and
offers young carers multiple pathways to information, advice, and personalised support. 
Priority 4: Promoting good mental health and wellbeing
No.  Action  Update 2025-26
46 Develop our nurturing approach across all
Children’s Services. 
A nurturing approach is being embedded across Children’s Services through shared trauma-informed and relational practice.
In Education teams this is evolving into a New Authority model that combines compassion with clear, supportive boundaries.
Professional learning in nurturing, Emotion Coaching, Positive Behaviour Support and CALM is supporting consistent adult
responses focused on safety, regulation and repair.  This year there are examples of joint problem-solving with Psychological
Services, Children’s Houses and CAMHS - growing a community of practice for care-experienced young people enabling
shared learning and consistency across services. 
47 Work with children, young people, families,
and communities to improve mental health
and wellbeing through physical activity and
social participation. 
Youth work activity continued to make a significant contribution to improving the health, wellbeing and life chances of young
people across North Ayrshire. A sector-leading approach to youth voice and participation enabled young people to influence
decision-making on issues including rights, equalities, mental health and community priorities through Youth Forums,
Champions Boards and the Joint Cabinet. This work strengthens confidence, belonging and civic participation, ensuring
services are shaped by young people’s lived experience, including care-experienced young people and young New Scots.
179

Page 180

17 
No.  Action  Update 2025-26
Targeted and universal programmes supported mental health, resilience and positive relationships across schools and
communities. Evidence-based and creative approaches, including Your Resilience, Bounceback, Drama for Wellbeing and
outdoor and physical activity programmes, helped young people develop emotional literacy, coping strategies and
self-regulation. Early intervention and prevention activity addressing suicide, alcohol and vaping risks was complemented by
workforce development on neurodiversity, trauma and complex behaviours, strengthening the quality and consistency of
support available to young people.
The Duke of Edinburgh’s Award continued to provide a strong wellbeing and achievement pathway, engaging over 1,000
young people across schools and communities and supporting progression through Bronze, Silver and Gold awards.
Alongside this, targeted programmes and partnerships supported care-experienced young people, young New Scots and
those facing additional barriers to build confidence, maintain connections to education and progress to positive destinations.
Together, these approaches demonstrate a coherent, strengths-based model that combines participation, prevention and
progression to improve wellbeing outcomes at scale. 
All Active Schools activities are designed to support and promote positive mental health and wellbeing for every child and
young person who takes part. Our year‑round programme of extra‑curricular opportunities, events and leadership initiatives
plays a vital role in reducing stress, boosting mood, and enhancing self‑esteem among participants. To further strengthen our
approach, the Active Schools team has developed a comprehensive guidance resource for schools. This guide raises
awareness of how our programmes contribute to improved mental health outcomes and provides practical examples of the
ways physical activity and leadership experiences can positively influence wellbeing. In addition, all coaches and volunteers
involved in Active Schools delivery participate in a robust mental health training programme. This training equips them with
the knowledge and confidence to recognise signs of poor mental health, create inclusive and supportive activity
environments, and respond appropriately to the needs of young people during their weekly sessions. Through this combined
focus on participation, education and staff development, Active Schools continues to play a significant role in nurturing
healthier, happier and more resilient young people across our communities.
48 Continue to have appropriate pathways in
place for supporting mental wellbeing. 
Our school counselling service supports children and young people aged 10-18, in the school setting, this year 500 children
and young people accessed the service with 98.6% reporting an improved CORE-YP score. Our Area Inclusion workers and
additional support staff continue to deliver Let’s Introduce Anxiety Management (LIAM) with positive impact. 
Mental and emotional wellbeing is one of the 10 priority pathways in the school nursing service.  We are currently exploring
ways to record this to allow more accurate reporting.  All staff nurses supporting the school nursing service are trained in
LIAM.
49 Work together with children, young people,
and their families to help build resilience. 
Education and Social Work teams have worked together in the following areas – see WFWF report for greater detail.
• Building parental confidence and capacity: The Building Positive Relationships (BPR) programme strengthens
adult presence, helping parents regulate, de-escalate and repair relationships, reducing reliance on crisis intervention
and supporting sustained family resilience. Pre-programme assessment, readiness processes and flexible delivery
enable families to access timely support before challenges escalate, building coping strategies and emotional
regulation skills. Emotion coaching, neurodevelopmental understanding and co-parenting inputs support parents to
180

Page 181

18 
No.  Action  Update 2025-26
better understand their child’s needs, improving relationships and reducing family stress. There is evidence that the
BPR approach is helping some families feel less alone, fostering peer connections and shared problem-solving that
strengthens family resilience.
• Consistent, joined-up support around families: Weekly Educational Psychology consultation with the Family
Centred Wellbeing Service (FCWS) has enhanced problem-solving, goal-setting and reflective practice, enabling
tailored, strengths-based support for families.
• Supporting attendance and anxiety: Development of targeted resources (e.g. animation groups and
attendance-related anxiety supports) helps children and families build confidence and coping skills linked to
engagement and participation.
• Empowering families of neurodivergent children: Training and resources shared with practitioners and families
promote understanding of sensory, emotional and communication needs, enabling consistent approaches across
home, early years and school. Psychological Services are working in partnership with NEST and the new Learning
and Development Advisor.
• Proactive planning and transitions: Use of NAIT resources such as Let’s Not Just See How It Goes and We Were
Expecting You with school teams supports anticipatory planning and predictable environments, reducing stress at key
transition points for children and families.
50 Improve services for children with neuro-
developmental conditions, implementing a
whole system approach with partners
across Health, Education, Social Services
and the Third Sector. (Implementation of
the National CAMHS and
Neurodevelopmental Specifications). 
The Business Case for a pan-Ayrshire diagnostic Neurodevelopmental service for children and young people is currently
being finalised and will be presented to Chief Officers.  In North Ayrshire, there has been a focus on training and development
of the children’s services’ workforce through WFWF monies to NEST, including the recruitment of an Learning & Development
Adviser for Neurodevelopmental Delay (NDD), who has been delivering a programme of opportunities to upskill the
workforce.  This was a recommendation from a NDD training needs analysis undertaken in North in 2024. 
51 Public Health will implement a life course
approach to Mental Health and Wellbeing,
focusing on the first thousand and one
days, infancy and Children and Young
People. 
Public Health have worked over the 25-26 period to produce a suite of life course evidence briefings. The mental health and
suicide prevention briefing will be used in the coming year to shape conversations with partners regarding the preventive
potential of a life course approach and opportunities based on evidence across the life course and across all stages of
prevention (universal, primary, secondary, tertiary). During 2025 - 26, Public Health has continued to strengthen and embed
mental health improvement activity across Education and wider children’s services in North Ayrshire. Examples of activity
include: 
• Promotion and Utilisation of MHWB Resources in Practice – The Guide for Children, Guide for Young People and
Children’s Workbook for Mental Wellbeing continue to be actively promoted across Education and to partners who
support children, young people and families. Work this year has focused on reinforcing awareness of these resources,
supporting staff to build them into everyday practice, and ensuring consistent access to practical tools that help initiate
and sustain wellbeing conversations.
• Supporting a Whole School Approach – Public Health continues to work with the North Ayrshire Education Mental
Health and Wellbeing Operational Lead to promote a Whole School Approach to mental health.
181

Page 182

19 
No.  Action  Update 2025-26
• Mental Health Improvement – a Practical Approach (MHI‑apa) – training is now being delivered across Education by
the MHWB Operational Lead, building capacity at school level and ensuring staff have the knowledge and skills to
support children, young people and families. Area Inclusion Workers continue to use and cascade this learning within
their roles, contributing to more consistent approaches across schools. This training is available through Public Health for
other groups who wish to participate. 
• Time, Space, Compassion – There continues to be network of facilitators delivering Time, Space, Compassion
workshops which are open to staff working across children's and young people's services. During April 2025 and March
2026, Public Health has organised and delivered 12 TSC workshops across Ayrshire and Arran. Four of these sessions
were in North Ayrshire. Staff from North Ayrshire have accessed a number of sessions, with attendance including staff
working with children and young people within both public and third sector organisations.
Enabling Conversations Toolkit – Initial discussions and awareness raising regarding the Enabling Conversations Toolkit
has taken place through the SSPG and Young People's Taskforce. In the coming year Public Health would like to see further
awareness raising and engagement with this toolkit as a guide which was created by and for young people, to find help and
support when experiencing painful feelings about suicide.  Enabling conversations toolkit - Suicide Prevention Scotland.
52 Establish a Community Planning
Partnership led Health and Wellbeing
Alliance to bring key partners together to
co-ordinate approach to targeting support to
improve individual, family and community
health and wellbeing. 
Work continues to align the Alliance to the strategic programmes including CHES and Active Communities. Updates to follow 
53 Build on services that encourage parenting
skills and interactions with between family
members. 
Please see responses to No. 15 and No. 23. 
54 Build on the National CAMHS Specification
through the 3 established pathways (core,
unscheduled care, neuro), ensuring young
people are on the correct pathway at a
much earlier stage. 
Pathways have been established and are now in place. 
55 Continue to provide ‘worry workshops’ e.g.
identifying key issues raised as worries by
North Ayrshire children and young people
and using this to develop targeted
workshops on these issues. 
This action was cancelled as no longer required. 
56 Be responsive and pro-active in responding
to and learning from Young Person’s
Suicide through our Young People’s
Suicide Prevention Taskforce. 
Our Young People’s Suicide Taskforce (YPST) has been a well-established group that has very successfully delivered
positive outcomes for suicide prevention.  The Taskforce was focussed of ensuring that a professional, cohesive and effective
multi-agency response was taken in the event of a child or young person completing suicide. This work resulted in the
creation and maintenance of a multi-agency Crisis Response Plan, that ensures all partners respond and contribute to
182

Page 183

20 
No.  Action  Update 2025-26
supporting young people, families, teachers and any other parties who require support at a very vulnerable time.  In April
2025, the Taskforce considered what actions were required to be taken forward in the forthcoming period; the conclusion
being that the substantive objectives of the group had been achieved. A bespoke meeting of the YPST on 07 May 2025
agreed that the YPST had achieved its main purpose – the development of the Crisis Response Plan (CRP). The CPR
remains effectual and operational to date and continues to serve as a trauma informed framework for responding to a young
persons suicide, ensuring timely support for families, schools, communities etc. Collectively this work demonstrates a shift
from individual service responses to a more coordinated , relationship based system built around what matters to infants,
children, young people and their families. 
As the YPST was aligned to the Strategic Suicide Prevention Group (SSPG) it was proposed that the responsibilities of the
YPST would be subsumed by the SSPG, with the Terms of Reference being amended to reflect that change. The excellent
and important work of the YPST was recognised by all members; and it was agreed that the tradecraft developed would not
be lost during the transition of responsibilities. On 26 May 2025 the proposal to stand down the YPST and transfer
responsibilities to the SSPG was presented at the Child Protection Committee (CPC).  The proposal was unanimously
agreed.  This approach was endorsed by COG in June 2025.  
57 Deliver the new National Secure
Adolescent Inpatient Secure Unit
(Foxgrove) for children across Scotland,
which will also benefit young people in
North Ayrshire. 
The service has been delayed in opening due to the facility not having been handed over by the main contractor as
'complete'. We are working with all parties to remedy this and it is hoped that the facility will be ready for handover in late
summer/ early autumn 2026.  At this point there is a projected 8-week period of post-handover works to be completed.  It is
anticipated, based on current projections, that we will be ready to receive admissions by December 2026. 
58 Explore opportunities to ensure young
people are not admitted to non-specialist
environments including options to develop
and in-house CAMHS inpatient provision. 
Working with the West of Scotland Tier 4 Regional Board to develop intensive home treatment services building on the
existing CAMHS Unscheduled Assessment Intensive Treatment Team (CUAIT). 
59 Building on the success of the Kilwinning
Wellness Model, the Revised Wellness
Model working group will now seek to roll
out the approach across all North Ayrshire
localities. 
The Wellness Model is now in place in all localities. Partnerships between the Education Service and local GPs have been
strengthened and CAMHS are receiving more robust referrals when necessary.
60 Enable young carers to have a quality of life
outside caring and ensure support when
moving through key life stages. 
We continue to prioritise opportunities that enable young carers to experience a positive quality of life beyond their caring
responsibilities; while ensuring they are fully supported during key transitions in education and life.
• Young Carers Education Fund (£15K–£20K annually) provides flexible financial support to meet identified needs
through Young Carers Statements. This includes opportunities for breaks from caring, participation in hobbies and
activities, and access to life-enhancing experiences that contribute to wellbeing, resilience, and personal
development.
• KA Leisure memberships are available for young carers, giving them regular access to health, fitness, and wellbeing
activities within their local community and supporting them to take time for themselves.
183

Page 184

21 
No.  Action  Update 2025-26
• Eligible young carers have been supported by Carers Gateway to apply for the ILF Scotland Transition Fund, helping
them build independence, confidence, and opportunities to engage socially, explore interests, and become more
active in their communities.
• Time to Live funding, accessed via Carers Gateway, provides young carers with the opportunity to apply for
personalised short breaks—helping reduce stress, improve wellbeing, and create positive time away from their caring
role.
• To support key educational transitions, Carers Gateway actively participates in enhanced transition planning from
primary to secondary school, ensuring young carers are identified early and their needs are understood. Young
carers preparing to leave secondary school can access a 1:1 Young Adult Carers Transition Plan, offering tailored
guidance around their caring responsibilities, available supports, future aspirations, and the move into further
education, training, or employment.
This multi-layered approach ensures that young carers are supported not only in their caring role, but also in experiencing a
balanced life, developing their potential, and moving confidently into adulthood. 
Priority 5: Inspiring children and young people to be active
No.  Action Update 2025-26
61 Create innovative physical activity and
sports opportunities with communities and
partners. 
Active Schools and KA Leisure have continued to work collaboratively to increase opportunities for children and young people
to be active across both school and community settings. Through strong partnership working, we have ensured that each of
the six localities has well‑established links between school‑based activity and wider community provision. Over the past year,
our joint efforts have also focused on identifying and addressing gaps in local provision. This has allowed us to create a more
equitable offer across all areas, ensuring that every young person—regardless of where they live—has access to a broad
range of activity and sporting opportunities. As a result, the pathways from school participation into local clubs and community
sport have been strengthened, supporting smoother transitions and encouraging sustained engagement. Furthermore, Active
Schools has maintained a strong commitment to supporting those young people who face the greatest barriers to
participation. By prioritising targeted programmes and coordinated support across our system, we continue to ensure that
those who need our help most are able to access and benefit from positive, inclusive sporting experiences. 
The Active Schools and Communities Partnership Officers have been instrumental in widening access to participation,
particularly for young people who are care‑experienced, living in poverty, at risk of disengagement, non‑attenders, or
otherwise identified for targeted support. Their work has effectively removed barriers and created meaningful pathways that
ensure these groups can participate in sport and physical activity with confidence and consistency. In addition, the team has
continued to provide valuable support to the HSCP, third sector organisations and children and young people with additional
support needs, strengthening collaboration across the wider system.
184

Page 185

22 
No.  Action Update 2025-26
KA Leisure continues to deliver a broad and inclusive programme of sport and physical activity opportunities. Working closely
with communities and partner organisations, we offer a varied calendar of term‑time sessions alongside an extensive holiday
programme. Our term‑time offer spans all localities, delivering more than 150 classes each week and ensuring that young
people and families have access to high‑quality, community‑based activity opportunities throughout the year. 
62 Adopt a whole systems approach to diet
and healthy weight. 
This action is no longer being progressed as it has been superseded by work on the requirement to develop a Good Food
Nation Plan. 
63 Design opportunities into the whole system
to enable children, young people, and their
families to access supported physical
activity opportunities and have a healthy
lifestyle. 
Active Schools remains firmly committed to its core priority of supporting all schools across North Ayrshire to deliver
high‑quality, inclusive extra‑curricular programmes that are accessible to every child and young person. This commitment
underpins everything we do and ensures that opportunities to be active, build skills and experience new sports are open to all,
regardless of background or ability. Throughout the year, participation trends across our schools have highlighted the
continued popularity of several key sports. The top five most actively engaged activities were football, netball, racket sports,
dance and multisports, reflecting a broad range of interests and demonstrating the strength of provision offered across our
localities.
Our annual events calendar has also continued to grow in both scale and impact. This year, more than 5310 young people
took part in a diverse programme of 75 competitive and participative events, showcasing their skills, representing their
schools and experiencing the excitement of large‑scale sporting occasions. These events play an essential role in developing
teamwork, resilience and confidence while providing memorable experiences for participants.
Importantly, our commitment to inclusion extends across all aspects of the programme. Active Schools has worked closely
with partners to ensure pupils with additional support needs can participate in meaningful and appropriate competitive
opportunities. This includes supporting ASN young people to attend both the Ayrshire Sportsability events and activities within
the Scottish Disability Sport calendar. By providing tailored pathways and ensuring representation at these events, we
continue to uphold our ambition that every young person has the chance to perform, compete and celebrate their
achievements at a level that is right for them.
64 Ensure all our early years indoor and
outdoor learning environments and
activities enable children to be physically
active. 
All early year’s establishments provide learning environments which provide opportunities for physical play both indoors and
outdoors. All staff are aware of the importance of developing gross motor skills and ensure experiences offered support
development of core strength, stability, balance, spatial awareness, co-ordination and agility.
65 Promote access to leisure services for
children and young people to encourage
participation in physical activities. 
KA Leisure continues to promote inclusive access to leisure facilities through targeted programmes, concessions and
outreach, increasing participation among children and young people across a range of physical activities.
66 Promote the introduction of the INSPIRE
programme to improve opportunities for
alternative activities, including arts, drama
and music. 
KA Leisure has supported the rollout and promotion of the INSPIRE programme, widening access to alternative activities
such as arts, drama and music to engage children and young people with diverse interests. We currently provide 105 classes
across all localities in North Ayrshire.
185

Page 186

23 
No.  Action Update 2025-26
67 Create and protect safe spaces for children
to play and enjoy being outdoors. 
Youth work programmes continued to create safe, inclusive and purposeful outdoor spaces that support children and young
people’s physical health, mental wellbeing and social connection. Outdoor learning remains a key delivery approach, enabling
young people to build confidence, resilience and a sense of belonging through structured, supported activity in community
and natural environments. Programmes are deliberately inclusive, ensuring access for care-experienced young people, young
New Scots and those facing additional barriers to participation.
The Duke of Edinburgh’s Award continues to be a cornerstone of this work, engaging large numbers of young people in
regular outdoor activity, skills development and expeditions across Scotland. DofE expeditions, day trips and overnight
experiences provide well-managed, safe environments where young people develop teamwork, leadership and
problem-solving skills while enjoying the outdoors. Alongside this, Outdoor Learning, Outdoors for Wellbeing and residential
opportunities offer accessible entry points for young people who may not engage with traditional settings, including targeted
provision for at-risk groups.
Complementary initiatives such as Gardening for Wellbeing, mountain biking, football and outdoor creative activities further
enhance safe outdoor provision by promoting routine physical activity, positive mental health and connection to place.
Gardening and nature-based activities support emotional regulation, responsibility and mindfulness, while team sports and
outdoor challenges strengthen social connections and confidence. Together, these approaches ensure children and young
people have regular access to safe, supportive outdoor spaces that encourage play, exploration and wellbeing, while
contributing to wider prevention, participation and achievement outcomes.
68 Support parents to understand the
importance of movement and enjoyment for
children and young people. 
Social Media campaigns have highlighted the importance of regular movement, enjoyment and positive experiences in
supporting children and young people’s wellbeing and development.
69 Work with local small business/ fitness
team to provide access to activity and
nutrition information. 
As above. 
70 Creation of new and local growing spaces
to support communities to grow foods, to
upskills families, enhance family time and
connection. 
Work continues to progress positively at the Three Towns Growers, with the HUB nearing completion. Final-stage planning is
now underway to agree operational arrangements for groups and individuals wishing to access and use the space. A further
successful Potato Day was held in March, attracting hundreds of visitors to the allotment site to purchase seed potatoes.
Community Roots have completed Phase One of their build and are currently securing funding to complete the remaining
elements. Once finished, the space will support education activities, holistic therapies, and provide a dedicated rest area for
volunteers. In parallel, preparations are underway to support local larder users to grow potatoes at home, with resources
including grow bags, compost, and seed potatoes being gathered for distribution.
Eglinton Community Gardens are preparing for the forthcoming growing season and will host their annual Potato Planting
Party, inviting local families to participate and engage in food-growing activities. The Organic Growers of Fairlie are once
186

Page 187

24 
No.  Action Update 2025-26
again planting and growing potatoes for the benefit of the local community and community larders. Springside Community
Association is developing a local network of growers, with plans to cultivate space surrounding the community centre to grow
a variety of vegetables for local residents and the community larder. An initial meeting has taken place with Facilities
Management to discuss the proposal, and the group is now exploring funding opportunities to enable the work to progress. 
71 Ensure all primary, secondary and ASN
schools are provided with quality extra-
curricular opportunities in sport and
physical activity that are open to all. 
Active Schools has remained firmly committed to its overarching ambition of achieving “More Kids, More Active, More Often.”
This focus continues to underpin our planning, partnerships and delivery across North Ayrshire. Throughout the year, we have
ensured that high‑quality extra‑curricular opportunities have been available across all primary, secondary and ASN
establishments, providing children and young people with a broad range of accessible, engaging activities.
Engagement levels have been exceptionally strong. A total of 9,781 young people participated in sport and physical activity
sessions during the year—representing over 53% of the entire school‑aged population in North Ayrshire. This reflects both the
reach of our programme and the value placed on physical activity by our schools, families and communities.
In terms of delivery, the scale of provision has continued to grow. Across the year, 13,065 individual sessions were offered,
generating an impressive 271,061 participant visits. This figure illustrates the depth of engagement within the programme: for
example, ten pupils attending ten sessions each equates to 100 recorded visits. These levels of participation highlight the
consistency with which young people return to Active Schools activities, demonstrating the positive experiences and
meaningful connections being created.
Our programme is powered by a dedicated network of deliverers. This year, 703 individuals contributed to the delivery of
Active Schools sessions—and notably, 98% of them were volunteers. This represents the highest proportion of volunteer
deliverers recorded anywhere in Scotland. Their commitment, time and passion are critical to the success of the programme
and play an essential role in ensuring sustained, high‑quality opportunities for children and young people.
72 Ensure all young people have the
opportunity to compete and perform
regardless of what level they are at. 
This year, our Active Schools Events Calendar has continued to grow in both scale and impact, providing a wide range of
meaningful sporting experiences for children and young people across North Ayrshire. More than 5310 participants engaged
in a diverse programme of 75 events, demonstrating the strong appetite for competition, participation and school‑to‑school
collaboration. These events are delivered across cluster, locality and authority‑wide levels, ensuring pupils have opportunities
to take part in sport close to home as well as within larger, North Ayrshire‑wide settings. This tiered structure not only widens
access but also allows young people to progress through different levels of competition and develop confidence in a
supportive environment.
A key focus of our events programme is ensuring that all young people, regardless of ability or need, have access to
appropriate and meaningful sporting pathways. We are particularly proud of the continued support offered to pupils with
additional support needs (ASN). Throughout the year, Active Schools has actively facilitated ASN participation in Ayrshire
Sportsability events as well as opportunities within the Scottish Disability Sport calendar. In addition to this, this year we have
establish a three Ayrshire approach to ASN competition and programming. This has allowed wider access and more
187

Page 188

25 
No.  Action Update 2025-26
opportunities for our ASN young people to attend. All these partnerships enable pupils to compete, perform and experience
success at a level tailored to their individual needs, ensuring fairness, inclusion and the chance to celebrate personal
achievement.
Through this comprehensive and inclusive approach, our events programme continues to play a vital role in promoting
participation, encouraging healthy competition, and ensuring that every young person across North Ayrshire can experience
the enjoyment and benefits of taking part in sport.
73 Create and support a school to community
club pathway for sport across North
Ayrshire. 
During the last academic year, Active Schools worked closely with 60 community sports clubs across North Ayrshire,
strengthening partnerships and increasing the breadth of provision available to children and young people. These clubs
contributed significantly to school engagement by delivering a variety of high‑quality activities, including:
• Curriculum enhancement sessions, providing additional PE input beyond the statutory two hours
• Health week activities, supporting whole‑school wellbeing initiatives
• One‑off taster days, offering pupils the chance to try new sports and activities
• Visits to local clubs, helping young people experience community‑based environments
• Promotion of club opportunities, such as distributing flyers and raising awareness of routes into long‑term
participation
In addition to this strong school‑club collaboration, our North Ayrshire Community Sport Hubs continue to thrive. Working in
partnership with KA Leisure, we have provided extensive support to local clubs, including access to training opportunities,
facility provision, and tailored one‑to‑one development sessions aimed at strengthening governance, sustainability and
volunteer capacity. To further enhance community engagement, we have collaborated with selected affiliated clubs to deliver
satellite club programmes, enabling more localised and accessible participation options for young people. These satellite
sessions are helping bridge the gap between school activity and long‑term involvement in community sport. We have also
prioritised the development of inclusive opportunities and have been working with the other Ayrshire’s to provide more
opportunities for our ASN young people to take part in at Club leave.
74 Ensure an effective leadership pathway is
developed for P6 through to S6 and beyond
to develop transferable skills. 
At primary level, the P6 Move and Improve Programme has made a significant impact, with 1,006 pupils trained as young
leaders this year. These pupils play a key role in their school communities by planning and delivering high‑quality lunchtime
sport and physical activity sessions for their peers. To strengthen the sustainability of the programme, 34 teaching staff have
also been trained, enabling them to support leadership development and ensure consistency across all participating schools.
In the secondary sector, the Young Ambassador Programme continues to thrive, with 126 S1–S6 representatives actively
championing sport and promoting the importance of being active within their school communities. These young leaders act as
role models, supporting events, raising awareness of opportunities and helping influence positive attitudes toward sport and
wellbeing.
188

Page 189

26 
No.  Action Update 2025-26
Leadership development is further enhanced through the North Ayrshire Sports Academy, aimed at senior pupils in S5–S6.
This year, 147 young people took part in the programme, gaining between 8 and 12 recognised qualifications each. These
include Saltire Awards, National Governing Body coaching qualifications, and, at the highest level, the SQA Higher
Leadership Award. The breadth of accreditation provides participants with valuable skills and nationally recognised
credentials that support future education, employment and volunteering pathways.
The commitment and enthusiasm of these young leaders is demonstrated through their collective contribution of more than
5000 volunteer hours within schools and the wider community. Their involvement has enriched local programmes, expanded
opportunities for younger pupils, and strengthened community engagement in sport. This comprehensive leadership pathway
not only builds capacity within North Ayrshire’s sporting landscape but also empowers young people with lifelong skills,
confidence and a sense of civic responsibility.
This year marked the successful introduction of Active Girls Committees across all nine secondary schools in North Ayrshire,
representing an important step forward in promoting gender equity in sport and physical activity. A total of 45 motivated young
leaders were appointed to these committees, each entrusted with the responsibility of encouraging increased participation
among female pupils and helping to remove the barriers that often limit girls’ engagement in physical activity.
Throughout the year, these young leaders have demonstrated exceptional commitment and maturity, acting as positive role
models within their school communities. They have collaborated closely with PE departments, Active Schools staff and wider
school teams to identify areas for improvement and to contribute to the development of more inclusive, girl‑friendly
environments. Their work has included advocating for the needs and preferences of female pupils, improving visibility of
opportunities, and championing a culture where girls feel confident and supported to be active. In addition to their strategic
contributions, the committees have played an active role in designing and delivering bespoke girls‑only programmes and
events, tailored specifically to increase engagement and create safe, welcoming spaces for participation. These initiatives
have included lunchtime and after‑school sessions, awareness campaigns, taster activities and targeted interventions to
encourage girls who may be less physically active. The creation and success of the Active Girls Committees has
strengthened the voice of young women in shaping school sport, contributing meaningfully to North Ayrshire’s wider
commitment to inclusion, empowerment and lifelong participation.
75 Ensure we remove any barriers to
participation for care experienced young
people to take part in sport and physical
activity. 
The Active Schools and Community Partnership plays a critical role in collaborating with key partners and stakeholders to
remove barriers faced by young people and families with Care Experience across North Ayrshire. By adopting a Whole
Systems Approach, the programme supports individuals to access sport and physical activity opportunities that contribute to
healthier, more active lifestyles.
Throughout the 2025–2026 period, 373 young people participated in a wide range of experiential opportunities. These
experiences were diverse and engaging, including activities such as water sports, climbing, sailing, residential trips, and
community fun days. To ensure equitable access, the team worked closely with internal and external partners to address
189

Page 190

27 
No.  Action Update 2025-26
individual barriers, including transport, appropriate clothing, food provision, and activity access. This coordinated support
enabled seamless participation for those who may otherwise have been excluded.
Following their initial experiential opportunity, young people were encouraged and supported to transition into regular physical
activity within their school or local community. As a result, 84% chose to continue their involvement in ongoing sport or activity
programmes. Of the 373 participants, 53% were living in the two most deprived SIMD quintiles (SIMD 1 and 2), demonstrating
the programme’s strong reach into communities experiencing significant inequality.
Over the four-year duration of the programme (Roles), the team delivered over 150 bespoke opportunities, engaging 1,124
young people with Care Experience. These experiences created meaningful pathways into sustained activity, with 72% of
participants moving into more frequent participation supported by their school or community settings.
In addition, the team delivered targeted support for 435 young people within ASN provision, ensuring that they too had access
to high-quality experiential opportunities. Impressively, 89% of these young people transitioned into regular, sustained
participation following their initial engagement.
Collectively, these achievements highlight the significant impact of the Active Schools and Community Partnership in reducing
barriers, widening access, and improving health and wellbeing outcomes for young people with Care Experience across North
Ayrshire. Unfortunately, these dedicated roles will come to an end in March 2026.
76 Expand and develop the Health and
Wellbeing Service to accommodate children
and young people, with a focus on
partnership working within the Mind and Be
Active programme to establish an early
intervention approach that provides
supported physical activity opportunities for
children and young people who are
experiencing poor mental health. 
Funding for the Mind and Be Active Programme was withdrawn by the Health and Social Care. 
Empower is a programme that supports young people to engage in regular physical activity with the aim to improve their
mental health, confidence and life skills.  The programme targets young people facing mental health challenges such as
stress, anxiety or social isolation.  These individuals are referred through healthcare professionals, schools or self-referrals
with delivery taking place within a school environment or local leisure centres.
77 We will work with Community Planning
Partners to establish a set of outcome
indicators to measure progress on each of
the priorities and actions. 
A set of performance indicators were established and have been used to monitor the progress of the Children’s Services Plan
2023-26 as can be seen in Appendix 2 of the Children’s Services Plan 2025-26 Performance Report.   
190

Page 191

APPENDIX 2: Childrens Services Plan Performance Indicators 2025-26 
Priority 1: The rights of children and young people are promoted and protected
Indicator 2022/23 2023/24 2024/25 2025/26
Children and Young People receiving Advocacy Support 282 284 240 352
Number of young people taking part in influence and engagement
through CLD (Community Learning and Development) (e.g.
engagement, youth participation and citizenship work)
20,694 15,202 11,746 11,185
Proportion of child protection re-registrations within 18 months  10.8% 11.4% 7.2% N/A 
Priority 2: Acting early to improve what happens next
Indicator 2022/23 2023/24 2024/25 2025/26
Percentage of children reviewed with at least one developmental
concern recorded at their 27-30 month review (PHS Dashboard) 20.5% 22.6% 20.0% N/A
Babies who have always been exclusively breastfed (reported at 6/8
weeks)  20.3% 25.6% 25.9% N/A
Children referred to Reporter for offences (aged 12-16) (rate per 1000)  10.0 14.7 10.1 N/A
Children referred to Reporter for care and protection (aged under 16)
(rate per 1000)  15.0 16.8 13.2 N/A
Immunisation uptake for 6-in-1 - children (aged 24 months) (annual,
calendar year) 96.6% 97.1% 96.2% N/A
Immunisation uptake for MMR - children (aged 24 months) (annual,
calendar year) 92.2 % 94.6% 93.9% N/A
Number of Requests for Assistance received - referred to Specialist
Services - for Speech and Language 26 46 12 29
Number of Requests for Assistance received – referred to HV support
workers within UEY (Universal Early Years) team in the period for
Speech and Communication
139 157 171 100
Percentage of Primary 1 Children free from dental decay  73.32% 69% N/A N/A
Percentage of Primary 7 Children free from dental decay  77.34% 70.1% 71.9% N/A
Uptake of the HPV vaccine in S3 girls (annual, school year) 84.1% 78.8% 80.5% N/A
Deaths from suicide (aged 11-25) (rate per 100,000) (5 year rolling
average) 10.3 11.2 N/A N/A
Alcohol-related hospital admissions (aged 11-25) (rate per 100,000) (3
year rolling average) N/A 151.9 N/A N/A
Drug-related hospital admissions (aged 11-25) (rate per 100,000) (3
year rolling average) 147.1 116 N/A N/A
Smoking during pregnancy as reported at antenatal booking (Calendar
year)
(2022)
15.4
(2023)
13.2
(2024)
11.2 N/A 
Priority 3: Making things fairer
Indicator 2022/23 2023/24 2024/25 2025/26
Proportion of Looked after Children with more than 1 placement in the
last year 17.4% 18.3% 17.8% N/A
Children looked after by the local authority as at 31st July (aged 0-17) 404 405 416 N/A
Children on the child protection register as at 31st July (rate per 1,000
children) 3.5 3.9 4.6 N/A
School attendance rate for whole population  89.0% 89.1% 89.6% N/A
School attendance rate for looked after children  84.2% 83.7% N/A N/A
Number of families receiving cash payments for Free School Meals
during holiday periods (school year, snapshot of data) 2,706 2,626 2,690 2,497
Combined Numeracy achievement for P1, P4 & P7 (expected CFE
level) 75.9% 76.2% 73.9% N/A
Combined Literacy achievement for P1, P4 & P7 (expected CFE level) 68.5% 68.6% 68.2% N/A
Percentage of pupils gaining 5+ awards at SCQF Level 5 (LGBF) 63% 65% 64% N/A
191

Page 192

Indicator 2022/23 2023/24 2024/25 2025/26
Percentage of pupils from 20% most deprived areas gaining 5+
awards at SCQF Level 5  52% 53% 54% N/A
Annual participation measure for all 16-19 year olds (calendar year) 92.0% 91.7% 92.5% N/A
School leavers entering an initial positive destination  96.5% 95.6% 95.7% N/A
Percentage of Children living in poverty after housing costs N/A (not
comparable
due to
method
change)
18.1% 18.0% N/A 
Priority 4: Promoting good mental health and wellbeing
Indicator 2022/23 2023/24 2024/25 2025/26
Number of referrals to CAMHS (ISD Child and Adolescent Mental Health
Services in Scotland) (Pan Ayrshire)  2,166 2,741 1,194 1,252
Percentage of referrals to CAMHS started treatment within 18 Weeks  95% 99% 99.6% 100%
Number of children and young people accessing Community Mental
Health and Wellbeing Supports and Services 6,038 5,962 6,527 TBC
Total number of children accessing counsellors (school year) 666 379 477 500
Percentage of children who have reported an improved outcome
following access to a counsellor 100% 100% 99.4% 98.6% 
Priority 5: Inspiring children and young people to be active
Indicator 2022/23 2023/24 2024/25 2025/26
Child healthy weight in Primary 1 (2% to 85% centile) 76.7% 74.8% 70.9% N/A
Number of young people (Distinct participants) engaged with Active
Schools during Extra Curricular (school year) 9,285 9,201 9,781 N/A
Number of Young people who are leaders in our key Active Schools
programmes (school year) 1,171 1,327 1,132 N/A
Number of Active Schools experiential opportunities offered to Care
experienced young people (school year) 31 31 25 N/A
Number of ASN (Additional Support Needs) pupils engaging with Active
Schools extra-curricular and through experiential opportunities (school
year)
140 213 435
N/A
KA Leisure memberships distributed either free or funded by partners 69 TBC 201 136
Active travel to school 47.49% 48% 42.4% N/A 
Please note – data that is not available yet is due to timescales of national data releases or
variations in reporting schedules, for example, academic years.  Data will be reviewed and
updated when available. 
192

Page 193

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Revenue Budget 2025/26 : Financial Performance to 31
March 2026 
Purpose:  To advise Cabinet of the financial performance for the Council
for 2025/26. 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial outturn position outlined
in the report; 
(b) approve the earmarking of £7.691m identified at 2.4 to
meet future year commitments in accordance with funding
requirements;
(c) note the financial performance for the Health and Social
Care Partnership highlighted at 2.5; and
(d) approve the virements detailed in Appendix 8. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2025/26 were approved by Council on
26 February 2025. The Housing Revenue Account (HRA) Revenue Budget for
2025/26 was approved by Council on 12 February 2025. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the fourth report for 2025/26 and covers the period to the end of March
2026 (Period 12). Projections have been made to the year-end. This is the final
financial performance information on which the annual accounts for the Council will be
prepared. 
1.3  At Period 12 the General Fund is reporting a net in-year underspend of (£2.014m),
(0.4%), after transferring resources to/from earmarked reserves This is an
improvement of (£0.334m) from that reported at Period 10 and is primarily related to
additional income, lower than anticipated employee costs within the Facilities
Management and Streetscene linked to staff turnover levels and lower than
anticipated utilisation of inflationary related provisions during the year. In recognising
that there continues to be volatility across certain areas of spend, linked to current
global events, this improved position has been partially offset by additional requests
for earmarking to meet anticipated cost pressures in 2026/27. The underspend will be
added to the General Fund Unearmarked Reserves which would increase the
Agenda Item 10
193

Page 194

available balance to 2.3% the revised General Services Revenue Budget which is
within the recommended range of 2 – 4%.  From the underspend, a total of £0.518m
is required to ensure unearmarked reserves are retained at a minimum level of 2%
within this range. Whilst the current level of unearmarked reserves remains at the
lower end of good practice, this still reflects a prudent position to help address areas
of significant risk to the Council through 2026/27, most notably through the financial
performance of the HSCP.
1.4  The Housing Revenue Account is reporting a net in-year underspend of (£3.943m),
(6.0%). This is a movement of (£1.617m) from the previously reported underspend at
Period 10. The movement is primarily related to reduced expenditure on property
costs and increased income. The underspend will be added to the HRA earmarked
balances to support service delivery in future years.
1.5  Work is ongoing to confirm the final Health and Social Care Partnership out-turn
position for the year, and the final confirmation of the NHS budget outturn is awaited.
The final outturn for the Council services element has been confirmed as an
underspend of £1.818m.  From this, £1.359m will be earmarked to meet future costs.
This leaves a £0.459m surplus to be added to the HSCP’s unearmarked reserves
bringing the reported position to a net break-even position. This is an improvement
of £1.941m from the previously reported Council services position.  A further report
will follow from the HSCP in the new year.
1.6 Management action is ongoing to address absence levels across services. However,
employee absence rates remain above targets, and there has been a marginal 0.9%
increase in days lost during the period when compared to the same period last year.
2. Background
General Fund
2.1   The Council set a balanced budget for 2025/26. In addition to the budget approved on
26 February 2025, earmarked funds of £85.088m were carried forward from 2024/25
for service expenditure in 2025/26 and beyond. These funds are reflected in the
figures within the 2025/26 financial performance reports as they are drawn down.
2.2 A net in-year underspend of £2.014m is reported, net of transfers to/from reserves.
The undernoted table details the final position on a service-by-service basis.
Service Expenditure
App
No.
Annual
Budget
£ million
Actual
Expenditure
to 31 March
2026
£ million
Variance
for year
(Fav)/Adv
£ million
Requests
for Carry
Forwards
£ million
Variance
after
Carry
Forward
(Fav)/Adv
£ million Note
Corporate Services 1 22.748 21.767 (0.981) 0.186 (0.795) (i)
Education 2 191.980 192.050 0.070 (0.193) (0.123) (ii)
Place 3 60.889 58.371 (2.518) 3.363 0.845 (iii)
Communities &
Housing 4 17.116 16.344 (0.772) 0.233 (0.539) (iv)
Other Corporate Items 5 15.971 10.781 (5.190) 3.357 (1.833) (v)
Sub Total 308.704 299.313 (9.391) 6.946 (2.445)
194

Page 195

Health and Social
Care Partnership 9 142.676 140.858 (1.818) 1.818 0.000
Balance for Services 451.380 440.171 (11.209) 8.764 (2.445)
Financing Charges 6 13.751 13.751 0.000 0.000 0.000
Contribution to Loans
Fund Reserve 6 10.187 10.187 0.000 1.500 1.500 (vi)
Total Planned
Expenditure 475.318 464.109 (11.209) 10.264 (0.945)
Aggregate External
Finance 6 (394.613) (394.637) (0.024) 0.000 (0.024)
Council Tax 6 (71.939) (72.984) (1.045) 0.000 (1.045) (vii)
Use of Earmarked
Funds 6 (8.766) (8.766) 0.000 0.000 0.000
Total Planned
Income (475.318) (476.387) (1.069) 0.000 (1.069)
Net Expenditure/
(Income) 0.000 (12.278) (12.278) 10.264 (2.014)
2.3 The reported Aggregate External Finance within Planned Income includes several
adjustments to Scottish Government funding from that reported at Period 10, as
detailed in the following table:
Movements on Planned Income
General
Revenue
Grant
£ million
Non
Domestic
Rates
£ million
Specific
Grants
£ million
TOTAL
AEF
£ million
Revised Budget at P10 (342.866) (42.606) (8.101) (393.573)
Pupil Equity Fund C/F 0.655 0.655
Discretionary Housing Payment
Undistributed (0.781) (0.781)
Teacher Pay Award (0.756) (0.756)
CSC Pay Uplift Adjustment 0.083 0.083
Revised Planned Income (344.320) (42.606) (7.446) (394.372)
2.4 Commentary on Significant Movements from Period 10
The Council's overall financial forecast against the revised budget is an improvement
of (£0.334m) from the previously reported position. A brief explanation of the
significant movements at a service level are outlined as follows:
(i) Corporate Services – underspend of (£0.795m), an improvement of
(£0.200m) from the previously reported underspend
The movement is primarily related to:
• Vacancy management across the services;
• Revisions to Statutory additions (£0.070m);
• Lower than anticipated ICT contract costs in-year (£0.067m).; and
• Underspend in Election costs (£0.081m)
195

Page 196

This has been offset by a request to Earmark £0.283m in relation to anticipated
ICT contract inflation in 26/27 (£0.138m), resources to support the outcome of a
Service review (£0.060m) and the carry forward of Election resources to support
the democratic process (£0.085m).
(ii) Education – underspend of £0.123m, a favourable movement of (£0.724m)
from the previously reported position
The movements are primarily related to:
• Increase in the underspend within Facilities management of £0.679m primarily
relating to vacancy management and reduced expenditure across supplies and
services.
• Reduction in the overspend within ASN of £0.402m as a result of reduced day
placement costs and a reduction in external residential placement numbers and
associated costs, through the work of the Brighter Pathways programme.
This has been offset by increased teacher costs across Primary and Secondary
Schools.
It is requested that £0.010m is earmarked to meet costs in relation to Furniture and
updated equipment for the Visual Impairment team in ASN.
(iii) Place – overspend of £0.845m, an increase of £0.434m from the previously
reported overspend
The movement is primarily related to:
• Funds received from the Extended Producer Responsibility Payment
(£1.087m) in accordance with the payment schedule.
• Increased underspend within Transport of £0.310m due to reduced
expenditure on repairs and maintenance, fuel and additional income.
• A favourable movement within Streetscene of £0.196m largely due to a
reduction in staff costs and increased income
• An over-recovery of Largs car park income as a result of the new pricing
structure.
This is offset by requests to earmark £1.939m, further to the £1.424m previously
approved, to support anticipated additional expenditure during 2026/27 in relation
to:
• Waste pressures and investments in accordance with Extended Producer
Responsibility funding requirements, £0.950m
• Programme of Fire risk Assessments and essential works, £0.400m
• Programme of Water Quality Assessments and essential works, £0.100m
• Largs Car Park income to be retained in Largs Car Park Fund, £0.104m
• Anticipated Fuel cost pressures in view of current global events, £0.274m
• Investment in Car parking infrastructure, £0.076m
• Provision for the Making Waves Festival, £0.035m
196

Page 197

Virements in relation to the realignment of budgets within Roads and
Employability have been included within Appendix 8.
(iv) Communities and Housing – underspend of £0.539m, an improvement of
(£0.139m) from the previously reported underspend
The movement is primarily related to:
• Increase in the underspend within Housing of £0.197m largely relating to
reduced Bad debt provision and write off costs.
• Reduced expenditure within connected communities of £0.261m relating to
lower than anticipated storm damage costs and service management of
budget lines to offset the impact of delay in implementing previously approved
libraries savings.
• Additional income within protective services of £0.255m
• Reduced expenditure on employee costs due to ongoing service redesign of
£0.094m
• An underspend due to the reprofiling of the local development plan into 2026-
27
• A surplus of £0.057m within Building services.
This has been partially offset by :
• An overspend of £0.314m in relation to demolition costs as a result of
significant fire damage at the Forum Centre Irvine.
• Requests to earmark £0.463m to support anticipated additional expenditure
during 2026/27 in relation to:
 Further anticipated costs in relation to the demolition of the Forum
centre following the major fire damage, £0.400m
 Local Development Plan, £0.043m
 Holiday Playschemes and Activities budget as part of a delivery
programme of activities in Summer 2026, £0.020m
(v) Other Corporate Items – underspend of £1.833m, an increase of (£0.757m)
from the previously reported underspend
The movement is primarily related to:
• Centrally held provisions not drawndown during the year, including pay
inflation, energy sustainability funding and energy cost provisions which have
been subject to ongoing volatility, even after allowing for a proportion of
advanced purchasing arrangements, (£2.041m)
• Workforce Planning cost provisions not required in year including Severance
costs and Equal pay £1.257m
• Funding to support ongoing Transformation activity secured as part of the
2025/26 Budget, not utilised in year £0.750m
This is offset by :
197

Page 198

• An overspend on insurance reflecting high level of excesses largely relating to
storm damage. £1.106m
• Requests to earmark £3.496m to support anticipated additional expenditure
during 2026/27 in relation to:
o Equal Pay Provision required to help address future risks, £0.494m
o Workforce Planning and Transformation resources required to
support ongoing programme £1.732m
o Property – Energy sustainability funding to address current volatility,
£0.500m
o DWP Housing Benefit Accuracy award, £0.018m
o Rapid Rehousing Transition Plan rolling programme £0.024m
o SG Resettlement programme funding £0.095m
o SG Nature Restoration funding £0.073m
o SG Island support funding £0.288m
o On-going Service re-design costs £0.031m
o SG NDR Empty Property Relief funding £0.241m
(vi) Contribution to Loans Fund Reserve – Overspend of £1.500m, an increase of
£1.500m from the previously reported position
In view of the current conflict in the middle east and the anticipated inflationary
impacts, the Bank of England forecast for interest rates now reflects an increase
from the current base rate of 3.75% up to 5.25% potentially during 2026/27. In
order to address the impact this will have on borrowing costs through 2026/27, it
is requested that £1.500m is earmarked and transferred to the Loans Fund
reserve.
(vii)Council Tax – over-recovery of (£1.045m), an increase of £0.448m from the
previously reported over-recovery
The movement reflects growth in the Council Tax base from additional new builds,
properties previously registered as self-catering holiday units for NDR purposes
that have come onto the Council tax register, and the impact of the application of
100% premium on Council tax for second homes when measured against the
original financial planning assumptions.
Health and Social Care Partnership
2.5 The final HSCP financial performance report for the year will be presented to the
Integration Joint Board on 18 June 2026 and will outline the 2025/26 financial
performance in more detail. Work is ongoing to confirm the final outturn position for
the year and the HSCP is awaiting final confirmation of the NHS budget outturn. The
final outturn for the Council services element has been confirmed as an underspend
of £1.818m.  £1.359m is to be earmarked to meet costs in relation to ADP, Whole
Family Wellbeing Fund, Community alarms, Magic Notes and Adult Social work
Restructure costs. This leaves a £0.459m surplus which is to be added to the
HSCP’s unearmarked reserves bringing the reported position to a net break-even
position.  This is an improvement of £1.941m from the previously reported Council
services position. A further report will follow from the HSCP in the new year.
198

Page 199

Absence Management 
2.6 The programme of work to monitor absence levels and effectively implement relevant
policies has been ongoing and initially resulted in a significant reduction in reported
absence levels across the Council. However, the year-end position shows a marginal
increase in days lost during 2025/26 when compared to 2024/25 i.e. 12.87 days lost
compared to 12.76 in 2024/25. The absence levels for the year exceed the target of
10.22 days. Within the Education Service, the number of days lost for teaching staff
has reduced by almost 8% when compared to the previous year (5.78 days compared
to 6.25 last year). The HSCP and the Communities and Housing directorate’s number
of days lost have increased by 20% and 4% respectively, with the Place directorate
showing a 14% improvement for the period. 
Risks 
2.7 Due to the anticipated outturn position of the HSCP in 2025/26, from the Council
services element, the level of HSCP unearmarked reserves will increase by £0.459m.
Moving forward into 2026/27, under the terms of the Health and Social Care
Integration Scheme, a recovery plan is required in order to address any projected
shortfalls in future years. There is a risk that, if the recovery plan is not successful, this
would have an impact on the level of financial contributions from the funding parties.
In such a circumstance the Council would be asked to make interim funds available.
The funding could be made available for repayment by the HSCP across a period of
future years or as an additional contribution. This HSCP position will continue to be
monitored through 2026/27, however, in view of the level of pressures faced by the
HSCP and the scale of savings required in 2026/27 to operate within available
resources, there is a risk that spend will exceed available resources. It is recognised
the Council’s underspend position 2025/26 will help provide a level of financial
mitigation to this risk. The other main risks are linked to current global events and the
potential impacts on inflation and interest rates through 2026/27. Again, to address
these, further mitigations through the earmarking of financial resources have been
included in the year end position. 
Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2025/26.  An
underspend of (£3.942m), net of transfers to/from reserves, has been reported. This is
an improvement of (£1.617m) from the previously reported position and is
summarised in the following table with further details provided in Appendix 7. The
underspend will be added to the HRA earmarked balances to support delivery of the
HRA Business Plan. 
199

Page 200

2.9 Commentary on Significant Movements from Period 10 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Property Costs – underspend of £1.092m, a favourable movement of 
(£1.250m) from the previously reported position
The movement is primarily related to reduced expenditure on Aids and
Adaptation, (£0.191m), Void Repairs (£0.276m), Planned and Cyclical
Maintenance (£0.466m) and Other Property Costs (£0.293m). 
(ii) Administration Costs – underspend of £0.212m, a movement of (£0.208m)
from the previously reported position 
The movement is primarily related to reduced expenditure on legal fees
(£0.103m), Central Recharges (£0.053m) and Insurances (£0.025m) 
(iii) Third Party Payments – underspend of £0.061m, a favourable movement of
(£0.122m) from the previously reported position
The movement is primarily related to reduced recharges from other Council
departments. 
(iv) Transfer payments – underspend of £0.053m, a movement of (£0.053m) from
the previously reported position
The movement is due to an underspend in disturbance allowances. 
(v) Other Expenditure – overspend of £0.398m, a movement of £0.398m from
the previously reported position
Housing Revenue
Account
Annual
Budget
£ million
Actual
Expenditure
to  31 March
2026
£ million
Variance for
year
(Fav)/Adv
£ million
Projected
Variance at
P10 
(Fav)/Adv
£ million Movement Note
Employee Costs 5.294 5.294 0.000 0.002 (0.002)
Property Costs 25.628 24.536 (1.092) 0.158 (1.250) (i)
Supplies and Services 2.145 2.130 (0.015) (0.006) (0.009) (ii)
Transport and Plant Costs 0.016 0.015 (0.001) 0.000 (0.001)
Administration Costs 2.114 1.902 (0.212) (0.004) (0.208) (iii)
Third Party Payments 3.832 3.771 (0.061) 0.061 (0.122) (iv)
Transfer Payments 0.177 0.124 (0.053) 0.000 (0.053)
Other Expenditure 0.550 0.948 0.398 0.000 0.398 (v)
Capital Financing 26.270 23.834 (2.436) (2.372) (0.064) (vi)
Gross Expenditure 66.026 62.554 (3.472) (2.161) (1.311)
Income (66.026) (66.496) (0.470) (0.164) (0.306) (vii)
Net Expenditure 0.000 (3.942) (3.942) (2.325) (1.617)
200

Page 201

The movement is due to an increase in the bad debt provision. 
(vi) Capital Financing Costs – underspend of £2.436m, a movement of (£0.064m)
from the previously reported position 
The movement is primarily related to revised loan charges reflecting the revised
profile of capital project delivery, leading to a lower level of in-year borrowing.
These funds will be required to support the HRA capital programme in future
years. 
(vii) Income – over recovery of £0.470m, a movement of (£0.306m) from the
previously reported position 
The movement is primarily related to an over-recovery in Council House rents
(£0.147m) and other income (£0.157m). 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a) note the information and financial outturn position outlined in the report; 
(b) approve the earmarking of £7.691m identified at 2.4 to meet future year
commitments in accordance with funding requirements;
(c) note the financial performance for the Health and Social Care Partnership
highlighted at 2.5; and
(d) approve the virements detailed in Appendix 8. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The final outturn position for the year is a net underspend of (£2.014m) after transfers
to and from earmarked reserves. 
Housing Revenue Account
The final outturn position for the year is a net underspend of (£3.942m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None.
201

Page 202

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Service (Finance), on 01294
324560. 
Background Papers
Revenue Budget 2025/26: Financial Performance to 31 January 2026 – Cabinet 17 March
2026
202

Page 203

Appendix 1
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Chief Executive's Office
Chief Executive's Office 197 214 17 9%
Total for Chief Executive's  Office 197 214 17
Financial Services
Change Programme 283 283 0 0%
Audit, Fraud, Safety & Insurance 701 688 (13) -2%
Corporate Procurement 815 566 (249) -31% 1        
Financial Services 1,749 1,634 (115) -7% 2        
Revenues (459) (546) (87) 19% 3        
Transformation 795 817 22 3%
Total for Financial Services 3,884 3,442 (442)
People & ICT
Employee Services 946 865 (81) -9% 4        
HR & Organisational Development 1,229 1,193 (36) -3% 5        
ICT 5,605 5,431 (174) -3% 6        
Business Support 1,594 1,554 (40) -3% 7        
Customer Services 4,759 4,700 (59) -1% 8        
Total for People & ICT 14,133 13,743 (390)
Democratic Services
Legal & Licensing 791 823 32 4%
Policy, Performance & Democracy 539 516 (23) -4%
Communications 503 507 4 1%
Civil Contingencies 60 59 (1) -2%
Committee Services 443 372 (71) -16% 9        
Member Services 1,560 1,528 (32) -2%
Information Governance 577 524 (53) -9% 10      
Ayrshire Area Support Team 61 39 (22) -36%
Total for Democratic Services 4,534 4,368 (166)
Net Totals 22,748 21,767 (981) -4%
Transfer to/ (from) Earmarked Reserves 97 283 186
Net Total 22,845 22,050 (795) -3%
203

Page 204

Appendix 1
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 18,290         17,858         (432)               -2%
Property Costs 85                118              33                  39%
Supplies and Services 3,462           3,174           (288)               -8%
Transport and Plant Costs 23                13                (10)                 -43%
Administration Costs 1,653           1,569           (84)                 -5%
Other Agencies & Bodies 2,274           2,209           (65)                 -3%
Transfer Payments 867              866              (1)                   0%
Other Expenditure -                   -                   -                     -
Capital Financing -                   -                   -                     -
Gross Expenditure 26,654         25,807         (847)               -3%
Income (3,906)          (4,040)          (134)               3%
Net Expenditure 22,748         21,767         (981)               -4%
204

Page 205

Appendix 1a
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement: There has been a favourable movement of (£0.091m) since P10 mainly due to continued forecasted
underspends in employee costs and overrecovery of income.
815 (167)              -20% Employee costs: There is an underspend of £0.167m due to vacancy management.
(100) (60)                -7% Income: £0.060m overrecovery of income from Procurement cards and rebates from Scotland Excel contracts.
(22)                -3% Other minor movements.
(249)             
Note 2 Finance - Financial Services
Movement: There has been a favourable movement of (£0.066m) since P10 mainly due to an over recovery of
£0.052m in staff recharges.
1,456 (45)                -3% Employee Costs: Underspend of £0.045m mainly due to vacancy management.
(108) (53)                Income: £0.053m over recovery of staff recharges.
(17)                Other minor movements.
(115)             
Note 3 Finance - Revenues
Movement: There has been a favourable movement of (£0.070m) since P10 largely due to revisions to statutory
additions.
(1,385) (48)                3% Income: There is an overall increase in statutory additions of £0.048m.
(39)                Other minor movements.
(87)               
Note 4 People & ICT - Employee Services
Movement: There has been a favourable movement of (£0.010m) since P10 due to vacancy management.
900 (78)                -9% Employee Costs: There is an underspend of £0.078m due to vacancy management.
(3)                  Other minor movements.
(81)               
Note 5 People & ICT - HR & Organisational Development
Movement: There has been no significant movement from P10.
413 (35)                -8% Third Party Payments: There is an underspend of £0.035m due to Occupational Health charges.
(1)                  Other minor movements.
(36)               
Note 6 People & ICT - ICT
Movement: There has been a favourable movement of (0.067m) since P10 due to contract costs being less, Co-
Pilot trial being funded from change fund and Wi-Fi support not being completed.
5,605 (179)              -3%
Supplies and Services: There is an underspend of £0.205m due to contract costs being less than expected, Wi-Fi
support not completed in September due to negotiations of new product offset with a £0.010m overspend in WAN
cicuits due to increase in contract prices and £0.016m overspend in other supplies in services due to no computer
disposals.
5                   Other minor movements.
It is requested to earmark £0.138m underspend in software licenses and support. This funding would be used to
offset the unforeseen and significant increase in charges under the current WAN contract, estimated at £0.138m.
Earmarking these underspends will allow the service to manage this in-year budget pressure within existing ICT
resources, while progressing the planned procurement of a replacement WAN contract
(174)             
205

Page 206

Appendix 1a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 7 People & ICT - Business Support
Movement: There has been no significant movement from P10.
1,583 (36)                -2% Employee Costs: There is an underspend of £0.036m due to vacancy management.
(4)                  Other minor movements.
(40)               
Note 8 People & ICT - Customer Services
Movement: There has been no significant movement from P10.
3,069 (78)                -3% Employee Costs: There is an underspend of £0.078m due to vacancy management.
19                  Other minor movements.
It is requested to earmark £0.060m for service review costs in 2026/27.
(59)               
Note 9 Democratic Services - Committee Services
Movement: There has been a favourable movement of (£0.081m) since P10 mainly due to underspend in Election
Costs.
443 (85)                -19% Election Costs: There is an underspend of £0.085m in relation to Election Costs for 2025/26.
14                  3% Other minor movements.
It is requested to earmark  £0.085m for future Election commitments.
(71)               
Note 10 Democratic Services - Information Governance
Movement: There has been a small favourable movement of (£0.007m) from P10.
571 (60)                -11% Employee Costs: Underspend of £0.060m due to vacancy management.
7                   Other minor movements.
(53)               
206

Page 207

Appendix 2
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Final Year
End Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
Note
No
£000 £000 £000
Early Years Education 21,528           20,868           (660)              -3% 1
Primary Education 55,635           56,447           812               1% 2
Secondary Education 67,948           69,278           1,330            2% 3
Additional Support Needs 17,754           18,725           971               5% 4
Central Education 4,980             4,581             (399)              -8% 5
Scottish Equity Fund 152                152                -                    0%
Pupil Equity Fund 4,074             4,074             -                    0%
Facilities Management 19,909           17,925           (1,984)           -10% 6
191,980         192,050         70                
Transfer to/(from) Earmarked Reserves 203                10                  (193)             
Net Total 192,183         192,060         (123)             
Subjective Summary
Annual
Budget
Final Year
End Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 108,021         109,763         1,742            2%
Employee Costs - Non Teachers 53,190           51,976           (1,214)           -2%
Property Costs 1,921             1,803             (118)              -6%
Supplies and Services 25,328           24,797           (531)              -2%
Transport and Plant Costs 160                187                27                 17%
Administration Costs 827                845                18                 2%
Other Agencies & Bodies 10,017           11,059           1,042            10%
Transfer Payments 580                426                (154)              -27%
Other Expenditure 1                    1                    -                    0%
Capital Financing 71                  84                  13                 18%
Gross Expenditure 200,116         200,941         825               0%
Income (8,136)           (8,891)           (755)              9%
Net Expenditure 191,980         192,050         70                 0%
-                    -                    -                   
207

Page 208

Appendix 2a
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance
as % of
budget Section
Note 1 Early Years Education
Movement : There has been an unfavourable movement of £0.041m since P10 mainly due to an increase of £0.058m in
employee costs.
15,895 (485) -3% Employee Costs: Overall an underspend of (£0.544m).
- Teachers:- underspend of (£0.055m.)
- Non Teachers:- underspend of (£0.430m) as a result of vacancy management after accounting for budgeted turnover.
5,341 (151) -3%
Third Party Payments: There are underspends of (£0.165m) in payments to funded providers due to a lower than
forecasted uptake of hours and a change in the charging model for cross boundary costs, partially offset by an
overspend of £0.024m in Speech Therapy costs.
(24) Other minor movements
(660)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.162m since P10 mainly due to increased teacher costs
53,155 784 1%
Employee Costs : Overall an overspend of £0.784m
- Teachers:- overspend of £0.758m   Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- underspend of (£0.027m) after accounting for budgeted turnover.
28 Other minor movements.
812
Note 3 Secondary Education
Movement : There has been a unfavourable movement of £0.219m since P10 mainly due to increased teacher costs
51,940 1,412 3%
Employee Costs : Overall an overspend of £1.412m
- Teachers:- overspend of £1.289m. Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- overspend of £0.123m after accounting for budgeted turnover.
15,834 (109) -1% Supplies and Services: forecasted underspend in PPP unitary charge mostly due to a reduction in energy costs
27 Other minor movements.
1,330
Note 4 ASN
Movement: There has been a favourable movement of (£0.402m) since P10. (£0.207m) of this favourable movement is
in Day Placements as a result of the level of assessed needs varying for some young people, transport costs were less
than projected and rates for one provider were lower than projected. There has been a (£0.117m) favourable movement
in Residential Placements as there are less children in Residential Placements compared to P10, and there has been a
decrease in rates from P10 projection. There has also been a favourable movement of (£0.067m) in Employee Costs.
16,034 (321) -2%
Employee Costs :  Overall underspend of (£0.321m)
- Teachers:- underspend of (£0.246m). Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- underspend of (£0.075m) reflecting the level of turnover within the service.
268 (32) -12% There is an underspend of (£0.032m) on payments to Other Local Authorities due to a reduction in the number of NAC
children accessing placements in their establishments.
1,310 (83) -6% Underspend of (£0.083m) on external day placements. Currently there are 31 children in day placement provision. This
service will continue to be monitored as options for alternative service provision are developed.
208

Page 209

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance
as % of
budget Section
499 1,414 283%
There is an overspend of £1.414m on external specialist residential placements. Currently there are 9 children in
accommodation. Increased pressures on internal care settings, as well as changing needs of children and young people,
have resulted in an increase in the need for external residential settings. Joint working is ongoing with HSCP on the
Brighter Pathways Programme to ensure that all options are fully explored to retain young people within their local
community where possible. Where this is not possible, a forum has been set up to further discuss those young people
who will require care and education provision to support them appropriately.
(7) Other minor movements.
It is requested to earmark £0.010m to purchase furniture and updated equipment for the Visual Impairment team.
971
Note 5 Central Education
Movement:  There has been a favourable movement of (£0.075m) since P10.
4,015 40 1% Employee Costs: There is an overspend of £0.040m mainly due to unachieved turnover.
(1,407) (431) 31% Income:  There is an over-recovery of PPP insurance rebate of (£0.285m) and PPP deductions of (£0.156m) in excess of
budget.
(8) Other minor movements
(399)
Note 6 Facilities Management
Movement: There has been a favourable movement of (£0.679m) since P10.  This is mainly due to further employee
cost underspends and further underspends across supplies and services lines
15,642 (901) -6% Employee Costs: There is an underspend of (£1.232m) primarily due to previous vacancy management, offset by a
budgeted turnover target of £0.331m resulting in a net underspend of (£0.901m)
1,612 (58) -4% Property Costs: There is an underspend of (£0.058m) across cleaning materials budget lines
5,434 (445) -8%
Supplies and services: There is an underspend of (£0.445m). This comprises of underspends in kitchen equipment of
(£0.376m) and other supplies and services of (£0.160m) which is offset slightly by an overspend on food costs of
£0.138m.
2,892 (625) -22%
Income: There is an over recovery in Commercial Catering of (£0.191m). A targeted approach over the last few years
has seen this outturn position change from a significant under recovery in income to the favourable position shown this
year. Over recovery in Cleaning/janitorial income of (£0.218m) and school meals income of (£0.215m) linked to an
uptake in paid meals within secondary schools
45 Other minor movements
(1,984)
Note 7 General
Teacher absence levels are subject to regular review across the service and appropriate actions are being taken to
maximise attendance. Average days lost per FTE is 8.82 for the period April-March.  Average days lost per FTE for same
period last year was 9.33.  This reflects an improved position for the year.
209

Page 210

Appendix 3
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Objective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Directorate and Support 995            836             (159)              (16%) 1    
Neighbourhood Services
Roads 8,109         8,034          (75)                (1%) 2    
Streetscene 5,875         5,753          (122)              (2%) 3    
Waste Resources 8,199         6,545          (1,654)           (20%) 4    
Municipalisation Advertising (73)             (29)              44                 (60%)
Total for Neighbourhood Services 22,110       20,303        (1,807)          
Economic Development, Growth & Regeneration
Economic Policy 337            261             (76)                (23%) 5    
Employability and Skills 2,274         2,274          -                    0%
Regeneration 702            703             1                   0%
Business 954            556             (398)              (42%) 6    
Growth & Investment 287            277             (10)                (3%) 7    
Total for Economic Development, Growth &
Regeneration 4,554         4,071          (483)             
Sustainability, Transport and Corporate Property
Property Management & Investment 2,129         2,132          3                   0% 8    
Housing Assets & Investment 95              -                  (95)                (100%) 9    
Property Maintenance 4,709         4,848          139               3% 10  
Property Running Costs 6,653         7,287          634               10% 11  
Energy and Sustainability 7,679         7,679          -                    0%
Internal Transport 11,965       11,215        (750)              (6%) 12  
Total for Sustainability, Transport and Corporate
Property 33,230       33,161        (69)               
Net Total 60,889       58,371        (2,518)           (4%)
Transfer to Earmarked Reserves 3,363          3,363           
Net Total 60,889       61,734        845              
210

Page 211

Appendix 3
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 31,558       32,297        739               2%
Property Costs 24,583       24,722        139               1%
Supplies and Services 4,548         4,634          86                 2%
Transport and Plant Costs 10,638       10,997        359               3%
Administration Costs 703            933             230               33%
Other Agencies & Bodies 21,044       19,834        (1,210)           (6%)
Transfer Payments -                 -                  -                    0%
Other Expenditure 78              90               12                 15%
Capital Financing 26              26               -                    0%
Gross Expenditure 93,178       93,533        355               0%
Income (32,289)      (35,162)       (2,873)           9%
Net Expenditure 60,889       58,371        (2,518)           (4%)
211

Page 212

Appendix 3a
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Directorate and Support
Movement: There has been a favourable movement of (£0.104m) since P10. This relates to Largs Car Park, with
increased income and a decrease in operating costs.
981 (56) (6%) Employee Costs: There is an underspend due to vacancy management.
(212) (85) 40% Income: £0.085m over recovery of income in Largs Car Park, as a new pricing structure was introduced in 2025/26.
(18) Other minor movements.
There is an underspend of £0.104m in Largs Car Park and this will be retained for the Largs Car Park fund, to be used in
future years.
(159)
Note 2 Roads
Movement: There has been a favourable movement of (£0.075m) since P10 primarily due to a reduction in forecasted
winter and energy costs within supplies and services of £0.108m and additional over recovery of income of £0.181m. This
is partially offset by an adverse movement of £0.138m in third party costs due to reactive emergency unplanned
maintenance costs and £0.093m in employee costs.
4,877 58 1% Employee Costs: £0.058m overspend due to additional overtime.
31 91 294% Transport Costs: £0.090m overspend mainly due to hire charges in particular of a gully unit.
2,828 (115) (4%) Supplies & Services: Underspends of £0.100m in winter salt/grit costs and £0.052m in electrical power, partially offest by
overspends of £0.026m in materials and £0.017m in software licence costs.
1,070 144 13% Third Party Payments: overspend of £0.091m within Engineering Services due to reactive emergency unplanned costs
together with £0.040m Winter overspend due to weighbridge replacement costs and Millport gritting contract.
(1,631) (226) 14% Income: £0.163m over recovery of design fees income mainly due to project management fees for Road Safety
Improvement Funds and 20mph projects and £0.076m over recovery in Decriminalised Parking Enforcement income.
(27) Other minor movements.
It is requested to earmark £0.076m, the DPE net income, which will be reinvested in the car parking infrastructure.
(75)
Note 3 Streetscene
Movement: There has been a favourable movement of (£0.196m) since P10. Vacant posts and a reduction in overtime and
casual staff costs have contributed to a favourable movement of £0.130m in Employee Costs. Income has seen a
favourable movement of £0.052m, with increased income from other departments, interment and memorial permit income.
There has also been a favourable movement of £0.012m in Supplies and Services.
7,712 (285) (4%) Employee Costs: £0.285m underspend due to vacancy management. Management are currently recruiting to fill vacant
posts in 2026/27.
455              66 15% Supplies and Services: £0.066m overspend includes £0.041m for storm rectification works, £0.011m overspend on tools
and machinery and £0.014m overspend on PPE.
(2,886)              77 (3%) Income: £0.077m under recovery of income, which includes £0.050m under recovery of interment income and £0.022m
under recovery of memorial permit income.
20 Other minor movements.
(122)
212

Page 213

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 4 Waste Services
Movement: There has been a favourable movement of (£0.951m) since P10 due to £1.087m of funds received from the
Extended Producer Responsibility payment, partially offset by additional costs within supplies & services of £0.127m which
includes £0.082m of trade effluent costs.
5,616            799 14%
Employee costs: Current sickness absence rates for April 2025 to March 2026 are 20.26 days per employee, a reduction of
10.15 days per employee when compared to the same period last year. A robust absence monitoring process is in place
and a dedicated resource has been recruited to monitor and review the absence management process in Waste, through
assisting supervisors with absence management meetings, referrals to occupational health etc and to support employees
return to work. The statutory nature of the service requires additional resources and/or overtime to cover unforeseen
absences resulting in additional costs. To help mitigate against this, resources out-with Waste Collections have received
HGV training to help provide cover for collections.  An overall review of the Waste service in light of legislative changes
and current service demands is ongoing. The absence rates reflect an improving position, however they are still above
target rates.
245            368 150% Transport Costs: Additional vehicles are currently in place to deal with ongoing pressures and demands.  Transport needs
are continuously under review and flexed depending on the operational needs of the service.
671 10 1%
Supplies & Services: Overspends in trade effluent of £0.082m, software and computer equipment costs of £0.018m, and
materials/tools and implements of £0.011m have been partially offset by underspends in refuse containers of £0.055m and
leachate of £0.052m.
6,896          (125) (2%)
Third Party Payments: Underspends mainly from diverted waste of £0.114m due to a reduction in tonnages as a result of
the implementation of the HWRC booking system, the recyclables contract of £0.046m, the organics contract of £0.048m,
and the Clyde Valley Contract of £0.025m, this is partially offset by an overspend in Special Uplift processing costs of
£0.093m due to increased costs for POPs waste.
(5,413)        (2,679) 49%
Income:  Income from the Extended Producer Responsibility (£4.350m) for packaging funds currently exceeds the amount
included in the Budget by £2.843m. These funds were received in 3 tranches from November 2025 and have been
allocated to cover chargeable disposal costs. In 2025/26 these funds helped address the pressures faced by the service
and supported further investment to meet operational needs and deliver service improvements. These funds together with
an over recovery in special uplifts income of £0.077m, sale of scrap of £0.023m, and the sale of vouchers of £0.019m, is
partially offset by an under-recovery in purple bin contract income of £0.175m due to reductions in recyclate market prices,
commercial refuse charges of £0.074m and sale of bins of £0.035m.
(27) Other minor movements.
A further request to earmark funds of £0.950m is made to the P10 request of £0.703m (total £1.653m), these funds will be
utilised to support waste pressures and investments in accordance with EPR funding requirements.
213

Page 214

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
(1,654)
Note 5 Economic Policy
Movement: There has been a favourable movement of (£0.021m) since P10.
347 (84) (24%) Employee Costs: Underspend of £0.084m due to vacancy management and maximising available external funding.
8 Other minor movements.
(76)
Note 6 Business
Movement: There has been an unfavourable movement of £0.012m since P10.
975 (400) (41%) Income: £0.400m received from Business Loans Scotland for contributions to the West Of Scotland Loans Fund.
2 0% Other minor movements.
(398)
Note 7 Growth & Investment
Movement: There has been a favourable movement of (£0.010m) since P10.
193 (10) (5%) Third Party Payments: Underspend of £0.010m in budget for Events.
It is requested to earmark £0.035m to support the Making Waves festival 2027 to support an event of sufficient scale and
quality to promote the Great Harbour programme.
(10)
Note 8 Property Management and Investment
Movement: There has been adverse movement of £0.120m since largely due to an under recovery in project income
(£0.171m), partially offset by an increase in the employee costs underspend (£0.081m) due to vacancy management.
2,733 (253) (9%) Employee Costs: There is an underspend of £0.253m primarily due to vacancy management.
(1,263) 211           (17%) Income: There is an under-recovery of fee income of £0.211m which is primarily related to projects.
45             Other minor movements.
3
Note 9 Housing Assets and Investments
Movement: There has been a favourable movement of (£0.095m) since P10 mainly due to increased income offset by
increased employee costs. This is now reported as on budget.
(2,204) (86) 4% Income: Increased income from HRA.
(9) Other minor movements
(95)
Note 10 Property Maintenance
Movement: There has been an adverse movement of £0.139m since P10 mainly due to insurance works (£0.272m),
partially offset by a reduction in spend in relation to security costs and Rationalisation.
0 272 Administration Costs: An overspend of £0.272m in relation to insurance works.
8,071 (92) (1%) Property Costs: An underspend of £0.092m largely relating to lower than anticipated security costs and reduced
expenditure within the rationalisation budget.
(41) Other minor movements.
It is requested to earmark £0.500m to undertake programmes of Fire and Water Quality Risk Assessments and essential
works which arise from these assessments.
139
214

Page 215

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 11 Property Running Costs
Movement: There has been a minor favourable movement of (£0.019m) since P10 due to a reduction in under-recovery of
income £0.101m, partially offset by increased overspends within property costs in relation to service charges and condition
surveys.
7,975 253 3%
Property Costs: Overspend of £0.100m due to Non Domestic Rates costs relating to the following properties: Moorpark
Primary which is scheduled for demolition, and Annickbank Innovation Campus which now has a lease agreed. The NDR
liability for Annickbank relates to the period it is unoccupied. There are also £0.058m of additional costs due to condition
surveys for the commercial estate and higher service charges of £0.072m.
(1,907) 376 (20%)
Income: Under-recovery of income £0.375m largely related to rental property income linked to market pressures, the
commercial property review is ongoing and we anticipate improvement in this position through recently agreed leases
which will fully come into effect in 2026/27 along with anticipated future pipeline of income from the capital investment
programme. 
5 Other minor movements.
634
Note 12 Internal Transport
Movement: There has been a favourable movement of (£0.310m) since P10, this is mainly due to an increased
underspend in Fuel of £0.076m, lower than projected costs for Software Licences of £0.026m, lower than projected Hires
costs of £0.019m, lower than projected overspend in Repairs and maintenance of £0.053m, an increase in Internal Pool
Vehicle Income of £0.042m and an increase in projected Bus Income of £0.060m.
1,714 (274) (16%)
Fuel: There is an underspend in fuel of £0.274m due to the current mix in fleet; HVO roll out, Electric Vehicles being
operated and fuel price volatility
5,513 (302) (5%)
Pupil Transport:  There is an underspend of £0.302m this was mainly due to changes from SPT as a result of expired
contracts with no renewal and savings on renewed contracts, linked to reduced levels of inflation, as well as in-house
operational efficiencies.
630 (61) (10%)
External Hires: There is a projected underspend in Roads Plant Hire of £0.103m due to works being allocated to capital. 
This is partially offset by an overspend of £0.061m mainly within Care at Home due to replacement vehicles to cover
extensive Vehicle Off Road time due to age of the current fleet and not having suitable zero emission alternatives readily
available. 
1,363 172 13%
Repairs & Maintenance: There is an overspend of £0.172m due to additional repairs being outsourced as a result of
difficulties recruiting Motor Mechanics (now resolved) during the first two quarters of the year along with maximising the life
of assets due to the availability of suitable replacements.  Automotive parts and third party labour cost continues to
increase.
(170) (241) 142%
Income: There is an over-recovery of £0.144m in bus transport income and an over-recovery of £0.121m in hire of pool
vehicle income which will support overspends in repairs and maintenance as end of life vehicles in pool are being retained
for longer, offset with a previously reported under recovery in Enterprise Cars Income.
(44) Other minor movements.
It is requested to earmark £0.274m in view of current global events to help address fuel cost pressures in 2026/27.
(750)
215

Page 216

Appendix 4
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Objective Summary
Annual
Budget
Projected 
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Directorate and Support 262            249             (13)                (5%)
Housing and Public Protection
Building Services (2,565)        (2,622)         (57)                2% 1    
Works Scoping and Quality Assurance -                 -                  -                    0%
Property Governance -                 -                  -                    0%
Planning Services 257            112             (145)              (56%) 2    
Protective Services 2,167         2,008          (159)              (7%) 3    
Other Housing 2,790         2,501          (289)              (10%) 4    
Total for Housing and Public Protection 2,649         1,999          (650)             
Connected Communities 14,205       14,096        (109)              (1%) 5    
Net Total 17,116       16,344        (772)              (0)          
Transfer to/ (from) Earmarked Reserves 230            463             233              
Net Total 17,346       16,807        (539)             
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 26,854       28,360        1,506            6%
Property Costs 4,603         5,129          526               11%
Supplies and Services 7,051         6,335          (716)              (10%)
Transport and Plant Costs 969            1,070          101               10%
Administration Costs 332            278             (54)                (16%)
Other Agencies & Bodies 12,527       12,531        4                   0%
Transfer Payments -                 -                  -                    0%
Other Expenditure 286            67               (219)              (77%)
Capital Financing -                 -                  -                    0%
Gross Expenditure 52,622       53,770        1,148            2%
Income (35,506)      (37,426)       (1,920)           5%
Net Expenditure 17,116       16,344        (772)              (5%)
216

Page 217

Appendix 4a
COMMUNITIES AND HOUSING
FINANCIAL PERFORMANCE 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been a favourable movement of £0.057m since Period 10.
10,792 (329) (3%)
Employees: an underspend in employee costs of £0.379m. This is due to vacancy management.
4,584 (570) (12%) Supplies & Services: an underspend in supplies and services of £0.570m. This is primarily as a result of an underspend in
materials due to changes in the income profile detailed below.
884 80 9% Transport: an overspend of £0.080m in transport costs primarily due to scaffolding costs linked to increased number of
factoring jobs received and some additional transport related costs.
3,287 184 6%
Third party payments: an overspend in third party payments of £0.184m. This is due to an overspend in payment to
contractors of £0.220m as a result of a carry forward of storm damage works from the previous financial year. This is partially
offset by an underspend of £0.036m in Agency costs.
(23,265) 614 -3%
Income: an under recovery in income of £0.614m. This is due to a reduction of £0.425m in voids works and £0.599m in
Projects, mainly due to a reduction in demand for replacement bathrooms and wetrooms at void stage as well as a reduction
in buybacks and the separation of communal windows from the window programme. There is also a reduction of £0.276m in
Aids & Adaptations. This is partially offset by an increase in Responsive Repairs income of £0.240m as a result of an
increase in storm damage works carried forward from last financial year partially offset by a reduction in other responsive
repairs and a 5% productivity efficiency. There is also an increase of £0.358m in Planned repairs due to increased timber and
damp works and an additional £0.096m in income mainly due to additional Estates Based Regeneration Programme fencing
works.
(36) Other minor movements
(57)
Note 2 Planning Services
Movement: There has been a favourable movement of (£0.031m) since Period 10, this is mainly due to underspend in Other
Supplies and Services of £0.043m.
100 (42) Supplies & Services: There is an underspend in Supplies & Services of £0.042m, mainly due to reprofiling of the  Local
Development Plan into 2026-27.
(684) (83) 12% Income: There is an over-recovery of £0.083m for additional planning fee application income.
(20) Other minor movements
It is requested to Earmark £0.043m of underspends which relate to the Local Development Plan
(145)
Note 3 Protective Services
Movement: There has been a favourable movement of (£0.043m) since P10, this is mainly due to a reduction in projected
emp costs of £0.094m due to ongoing service redesign, an increase in the over-recovery of Building Warrant income of
£0.155m and an over-recovery of income from HRA of £0.100m, offset with an overspend in Property costs of £0.314m due
to Forum fire
2,731 (189) (7%) Employee Costs:  There is an underspend of £0.180m, this is primarily due to a delayed implementation in the Scheme of
Delegation.
247 315 128% Property Costs:  There is an overspend of £0.314m, this is due to costs associated with making site safe following the Forum
fire of £0.300m and other minor variances
(1,233) (337) 27% Income: There is an over-recovery of £0.195m for additional Building Warrant income, an over-recovery of £0.100m in
income from HRA and other minor variances
52 Other minor movements
It is requested to Earmark £0.400m for further costs in relation to the demolition of the Forum Centre following the major fire
damage.
(159)
217

Page 218

Appendix 4a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 4 Other Housing
Movement: There has been a favourable movement of (£0.197m) since P10. This is mainly due to due to lower than
anticipated bad debt provision and write off costs.
3,524 (169) (5%) Employee Costs: There is an underspend of £0.169m due to vacancy management.
3,350 111 3%
Property Costs: An overspend of £0.166m mainly due to additional maintenance costs to be addressed at the void stage in
relation to homeless furnished units, partially offset by undersend in property repair costs of £0.027m and small variances
across other property costs.
55 (40) (73%) Administration Costs: Underspend due to lower staff training costs of £0.018m and legal expenses of £0.018m.
286 (220) (77%) Other Expenditure: underspend of £0.220m due to lower than anticipated bad debt provision and write off costs.
(7,016) 61 (1%) Income: There is an under-recovery mainly due to temporary furnished accomodation and hostel rents.
(32) Other minor movements
(289)
Note 5 Connected Communities
Movement: There has been favourable movement of (£0.261m) since P10.  This is due to a favourable movement of
£0.119m in property costs following less than anticipated costs in relation to Storm Eowyn and service management of
budget lines to offset the impact of revised programming of implementation of the libraries 20% reduction efficiencies target.
7,508 (5) (0%)
Employee Costs: There is a projected overspend of £0.098m related to the revised programming of implementation of the
approved saving for the libraries 20% reduction efficiencies target with work ongoing as part of the Land and Property review.
This is offset by management of other lines to reduce the impact, including an underspend of £0.103m across the service
primarily due to vacancy management.
767 66 9% Property Costs: An overspend of £0.106m due to storm damage repairs at Eglinton Country Park offset against an
underspend of £0.045m in library fixtures and fittings.
890 (70) (8%) Supplies and Services: There was an underspend of £0.070m primarily due to reduced spend within libraries.
(2,205) (95) 4% Income: There was an over recovery of Harbour Arts Centre income of £0.049m and Arran Outdoor income of £0.044m.
(5) Other minor movements.
It is requested that we earmark the Holiday Playschemes and Activites budget of £0.020m as part of delivery of a programme
of activities in summer 2026.
(109)
218

Page 219

Appendix 5
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 12 MONTHS TO 31 MARCH 2026
Objective Summary Annual Budget Final Outturn
Annual
Variance
Adverse or
(Favourable) % Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,261 2,254 (7)                      0%
SPT Concessionary Fares 291 291 -                        0%
Ayrshire Joint Valuation Board 1,002 1,002 -                        0%
3,554 3,547 (7)                      0% 1               
Other Corporate Costs
Pension Costs 2,157 2,157 -                        0%
Central Telephones 133 133 -                        0%
Other Corporate Items (incl Transformation Costs, Bad
Debt Provision, External Audit fees and other centrally
held funding.)
7,509 1,024 (6,485)              -86% 2               
Insurance Account -1033 73 1,106               -107% 3               
Housing Benefit 3,651 3,847 196                   5% 4               
-
Net Total 15,971 10,781 (5,190)              (32%)
Transfer to/ (from) Earmarked Reserves 139 3,496 3,357              
Net Total 16,110 14,277 (1,833) (11%)
219

Page 220

Appendix 5a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 12 MONTHS TO 31 MARCH 2026
Budget
£000
Outturn
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
No signficant movements since P10
3,554             (7)                  0% Projected underspend of (£0.008m) due tp confirmation of annual requisitions and applicable refunds.
(7)                 
Note 2 Other Corporate Items
There has been an favourable movement of £6.485m since P10 primarily related to centrally held inflationary and othe budget
pressures not required in year.
7,268             (6,244)          (86%) An underspend of £6.485m in relation to centrally held inflationary and other budget pressures not required to be drawndown in
year.
(6,244)
Note 3 Insurance
There has been an adverse movement of £1.106m since P10 as a result of year end allocations of Insurance premiums and Excesses
(1,033)            1,106           -107% An overspend on insurance reflecting high level of excesses largely relating to recent storm damages.
1,106          
Note 4 Housing benefit
There has been a favourable movement of (£0.094m) since Period 10 in relation to the year end Housing Benefit submission to the
DWP.
3,651 196               5% Overspend of £0.040m due to the provision of Housing Benefits, reduced Bad Debt Provisions and additional overpayment recovery
196
220

Page 221

Appendix 6
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 13,751 13,751 - -
Contribution to Loans Fund Reserve 10,187 10,187 - -
Scottish Government Funding (394,613) (394,637) (24) 0%
Council Tax (71,939) (72,984) (1,045) 1% 1
Use of Earmarked Funds (8,766) (8,766) - -
Net Total (451,380) (452,449) (1,069) 0%
Transfer toEarmarked Reserves 1,500 1,500                   2
Net Total (451,380) (450,949) 431 (0%)
Note 2 Transfer to Earmarked Reserves
In view of the current conflict in the middle east and the anticipated inflationary impacts, the Bank of England
forecast for interest rates now reflects an increase from the current base rate of 3.75% up to potentially 5.25%
during 2026/27. In order to address the impact this will have on borrowing costs through 2026/27, it is requested
that £1.500m is earmarked and transferred to the Loans Fund reserve. 
The projected over recovery reflects growth in the Council Tax base from additional new builds, properties
previously registered as self-catering holiday units for NDR purposes that have come onto the Council tax register,
and the impact of the application of 100% premium on Council tax for second homes which has exceeded original
financial planning assumptions.
Note 1 Council Tax
There has been a favourable movement of £1.045m since P10 due to updated Council tax projections.
221

Page 222

Appendix 7
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget P12 outturn
Year End
variance
%
Variance Note No
£  £  £
Employee Costs 5,294 5,294 0 0%
Property Costs
Responsive Repairs 7,406 6,714 (692) (9%)
Void Repairs 4,656 4,348 (309) (7%)
Planned and Cyclical Maintenance 6,047 6,197 150 2%
Aids and Adaptions 1,792 1,342 (450) (25%)
Other property costs 5,726 5,935 209 4%
Total for Property Costs 25,627 24,536 (1,092) (4%) 1
Supplies & Services 2,145 2,130 (15) (1%)
Transport Costs 16 15 (1) (6%)
Administration Costs 2,114 1,902 (211) (10%) 2
Third Party Payments 3,832 3,771 (61) (2%) 3
Transfer Payments 177 124 (53) (30%) 4
Other Expenditure 550 948 398 72% 5
Capital Financing Costs 26,270 23,834 (2,437) (9%) 6
Gross Expenditure 66,026 62,555 (3,472) (5%)
Income
Council House Rents (62,592) (62,740) (147) 0%
Other Rents (541) (358) 183 (34%)
Recharges (1,212) (1,505) (292) 24%
Other Income (959) (1,174) (214) 22%
Transfer from HRA Balances (722) (722) 0 0%
Total Income (66,026) (66,497) (470) 1% 7
Net Expenditure (0)                 (3,942)           (3,942)          
222

Page 223

Appendix 7a
HRA
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Variance
£000 Variance as % of budget
Note 1
25,627 (1,092) -4%
(1,092)
Note 2
2,114 (211) -10%
(211)
Note 3
3,832 (61) -2%
(61)
Note 4
177 (53) -30%
(53)
Note 5
550 398 72%
398
Note 6
26,270 (2,437) -9%
(2,437)
Note 7
(66,026) (470) 0.7%
(470)
An over-recovery in income of £0.469m due to an over-recovery of £0.147m in Council House Rents, £0.292m in
Recharges primarily due to insurance recoveries and £0.214m in other income in relation to additional grants. This is
partially offset by an under-recovery of £0.184m in Other Rents as result of rent refunds and ex tenant arrears.
Income
Movement: There has been a favourable movement of £0.306m since Period 10.
Capital Financing Costs
Movement: there has been a favourable movement of £0.065m since Period 10.
An underspend of £2.437m in capital financing costs which reflects a continuing strategy to delay new external borrowing
by utilising cash balances, resulting in savings on external interest costs, changes in the profile of the capital programme
and projected investment income returns.
An underspend of £0.053m in Transfer payments due to a lower volume of disturbance allowances than anticipated when
the budget was set.
Other Expenditure
Movement: there has been an adverse movement of £0.398m since Period 10.
An overspend of £0.398m in Other Expenditure due to a review of the level/ methodology for calculation of the bad debt
provision.
Movement: there has been a favourable movement of £0.122m since Period 10.
An underspend of £0.061m in Third party payments due to an underspend in internal recharges.
Transfer Payments
Movement: there has been a favourable movement of £0.053m since Period 10.
Administration costs
Movement: there has been a favourable movement of £0.207m since Period 10.
An underspend of £0.211m in Administration costs. This is primarily due to lower than anticipated expenditure on external
legal fees (£0.103m), central recharges (£0.053m) and insurances (£0.025m).
Third Party Payments
Section
Property Costs
Movement: there has been a favourable movement of £1.250m since period 10. This is due to favourable movements of
£0.191m in Aids and Adaptations, £0.024m in Responsive Repairs, £0.276m in Void Repairs, £0.466m in Planned and
Cyclical Maintenance, and £0.293 in Other Property costs
An underspend of £1.092m in Property costs. This is due to an underspend of £0.692m in Responsive Repairs, primarily
as a result of an underspend of £0.162m in Emergency Repairs, £0.436m in Planned Repairs and £0.177m in RTR, an
underspend in Void Repairs of £0.309m and £0.450m in Aids & Adaptations. An element of the Voids and Aids and
Adaptations underspends, in particular, are attributable to the ongoing Housing Transformation Programme. These
underspends are partially offset by an overspend of £0.150m in Planned and Cyclical Maintenance and £0.209m in other
Property costs due to void rent loss.
223

Page 224

Appendix 7a
HRA
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
B/fwd from
2024/25
Transfer to /
from
Reserves
Use of
Earmarked
Sums
Earmarking of in
year surplus
Funding of
Capital Projects Reallocation
Balance at
31/03/26
£m £m £m £m £m £m
13.213 3.942 (0.227) 16.928
5.000 (0.495) 4.505
2.000 (0.213) 1.787
Unearmarked 1.758 0.170 1.928
0.170 (0.170) -
22.141 - - 3.729 (0.722) - 25.148
Housing Services Transformation Programme
Tenant led budget
Council House Building Fund
Sustainability Fund
HRA reserves and balances
224

Page 225

Appendix 8
Place
Employability - Employee Costs T 0.405
Employability - Income T 0.245
Employability - Transport Costs T 0.004
Employability - Third Party Payments T -0.612
Employability - Supplies and Services T -0.022
Employability - Admin Costs T -0.020
Roads - Employee Costs T -0.027
Roads - Supplies & Services T -0.073
Roads - Third Party Payments T 0.376
Roads - Income T -0.276
0.000
Perm (P) /
Temp(T)
Virement £m
Directorate
Total £m
Budget Management - 31 March 2026
Virement/Budget Adjustment Requests
2025/26
225

Page 226

226

Page 227

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Capital Programme Performance to 31 March 2026 
Purpose:  To advise Cabinet of progress in delivering the Capital
Investment Programme 2025/26. 
Recommendation:  That Cabinet agrees to:
(a)  note the revisions to budgets outlined in the report; 
(b)  note (i) the General Services and HRA revised budgets at 31
March 2026; and (ii) the net expenditure to 31 March 2026; 
(c) approve the virement proposal noted within the HRA
programme detailed in appendix 2. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2025/26 to 2033/34 was
approved by Council on 26 February 2025. The Housing Revenue Account (HRA)
Capital Investment Programme 2025/26 sits within the updated HRA Business Plan
and was approved by Council on 12 February 2025. 
1.2  This report identifies the current programme for 2025/26, taking account of
adjustments made to the initial budgets. The report presents the revised budgets and
actual expenditure to 31 March 2026. 
1.3  At Period 12 the General Fund is reporting a break even position against a revised
budget of £59.499m. The HRA is reporting a net underspend of (£0.560m) against a
revised budget of £37.477m. 
1.4  Within the General Fund, adjustments to funding have resulted in net reduction to the
overall capital programme of (£0.954m), primarily related to Scottish Government
Grant for Arran Youth Foundation and Brodick Hall and accounting adjustments to
transfer funding to the General Fund Revenue budget. 
1.5 Reviews of individual project plans have identified several adjustments to the current
profiles. As a result, projects totalling (£21.007m) have been reprofiled for delivery in
2026/27 and beyond. These have been partly offset by the acceleration of £12.332m
to 2025/26 from future years. 
Agenda Item 11
227

Page 228

1.7 Within the HRA Capital Programme, a review of delivery timescales has resulted in
the re-profiling of (£6.481m) of works for delivery in 2026/27 and beyond, partly offset
by the acceleration of £2.000m from future years.   
1.8 Ongoing uncertainty arising from inflationary pressures and construction cost volatility
continue to impact on the Capital Programme. The risk profile is also impacted by
recent global events including the middle east conflict which has the potential to have
a significant inflationary effect and current Bank of England forecasts indicate an
increase in interest rates through 2026 is likely. Financial risks have been identified
across several high value projects. Council has provided for a degree of mitigation
within the overall 10-year General Services Capital Investment Programme and the
HRA Capital Investment Programme. Projects will continue to be monitored closely
with cost increases met initially from the additional flexibility built into the programme
and considered as part of the closure of the year end Revenue Budget process. Any
requirement for further borrowing not met from a funding source will be a matter for
Council to consider. 
2. Background 
General Fund 
2.1  The following table outlines the movements in the 2025/26 General Services budget:    
General Services Capital  2025/26
£ million
Budget as at 31 January 2026 69.128
Changes to Funding 0.883
Other Revisions to the Programme (1.837)
Revised Budget 68.174
Alterations to phasing of projects 2025/26 to
2026/27 (21.007)
Alterations to phasing of projects 2026/27 to
2025/26 12.332
Budget as at 31 March 2026 59.499 
2.2 Changes to Funding 
The capital programme has been updated to reflect the following changes to funding: 
Funding Body
Amount
£ million Project
Scottish Government Grant 0.382 Arran Youth Foundation
Scottish Government Grant 0.324 Brodick Hall
Dept for Transport 0.271 Depot charging scheme
SPT 0.072 Road Safety Improvement Fund
Active Travel  0.009 B714
LTA Tennis Foundation 0.002 Brodick Tennis Courts
Active Travel grant - Downturned (0.002) Girdle Toll to Irvine Town AT Route
Doveyard Ltd - Downturned (0.003) Roads Remediation
228

Page 229

Active Travel grant - Downturned (0.009) Links to Eglinton Park
Scottish Government Grant -
Downturned (0.163) 20mph Implementation
Total Funding Adjustments 0.883   
2.3 Other Revisions to the Programme 
Funding Source
Amount
£ million Project
CFCR 0.050 Vehicles
CFCR 0.037 Great Harbour Phase 1
CFCR 0.026 AGD Marine Tourism
Capital Receipts 0.014 Vehicle Insurance Recoveries
CFCR 0.010 AGD Phase 2 Maritime Mile
Transfer to Revenue (0.002) PBIP Beith Kirk
Transfer to Revenue (0.005) RTPI North Coast & Garnock Valley
Transfer to Revenue (0.006) Repurposing Property (VDLF)
Transfer to Revenue (0.008) Repurposing Property (PBIP)
Transfer to Revenue (0.010) Repurposing Property (NAVT)
Transfer to Revenue (0.025) Kildonan Hall
Transfer to Revenue (0.026) Millport Town Hall Phase 2
Transfer to Revenue (0.029) VDLF
Transfer to Revenue (0.030) Cumbrae Youth Forum
Transfer to Revenue (0.045) PBIP
CFCR (0.057) General
Transfer to Revenue (0.144) PBIP Community Project
Transfer to Revenue (0.289) Island Pit Stops
Transfer to Revenue (0.356) Garrison House 
Transfer to Revenue (0.417) UK Shared Prosperity
Transfer to Revenue (0.525) Improvement Grants
Total Other Adjustments (1.837)   
2.4   Alterations to the Phasing of Projects 
A review of individual project plans has identified a requirement to re-profile
(£21.007m) of works for delivery in 2026/27 and beyond. 
Project Amount
£ million
Arran Youth Foundation Centre (0.382)
CCTV Review (0.252)
Abbey Tower (0.067)
Brodick Tennis Courts (0.020)
Total Communities & Housing (0.721)
Ardrossan new Build (4.608)
229

Page 230

UFSM (0.113)
Schools ICT (0.030)
Total Education (4.751)
Eclipse CAH system (0.153)
Other Minor Movements (0.033)
Total HSCP (0.186)
Flexibility (3.737)
Other Minor Movements (0.001)
Total Other (3.738)
AGD i3 Flexible Space (4.630)
AGD I3 DPMC Phase 2 (1.000)
AGD Marine Tourism Cumbrae (0.746)
LBPR (0.610)
AGD Coastal Hub Phase 1 (0.441)
Millburn FPS (0.405)
AGD I3 DPMC Phase 1 (0.337)
Brodick Hall (0.324)
Cemeteries (0.266)
Coastal Adaptation (0.258)
Millport Pier (0.215)
Bridges Infrastructure (0.211)
Long Drive (0.202)
Nature Restoration Fund (0.175)
PLI (0.170)
UK Shared Prosperity Fund (0.160)
Marine Tourism Lochranza (0.130)
Goldcraigs Refurb (0.128)
PBIP (0.112)
Irvine High Street (0.099)
Access Park Network Prog (0.089)
Mont Park Neighbourhood Centre (0.081)
Fleet Decarbonisation (0.080)
Lochshore Garden Activity Hub (0.080)
Lighting (0.070)
Montgomerie Park Masterplan (0.062)
Lochshore Garbock Hub (0.060)
Parking Charges, DPE (0.054)
Portland Road (0.050)
Other Minor Movements (0.335)
Total Place (11.580)
ICT Investment Fund (0.026)
Telephony (0.005)
Total Corporate Services (0.031)
Alterations 2025/26 to 2026/27 (21.007) 
230

Page 231

These adjustments have been partly offset by the acceleration of £12.332m of
expenditure to 2025/26 from future years. 
Project Amount
£ million
Flexibility 4.872
Total Other 4.872
Other Minor Movements 0.009
Total Education 0.009
AGD Projects 5.237
AGD I3 DPMC Phase 2 1.000
Millburn FPS 0.635
Active Travel Ter 1 0.225
B714 0.145
Local Regeneration Fund 0.139
Roads Improvements 0.070
Total Place 7.451
Alterations 2026/27 to 2025/26 12.332 
2.5 These adjustments have resulted in a revised 2025/26 budget at 31 March 2026 of
£59.499m, a net reduction of (£9.629m). 
2.6 The following graph illustrates the movement in each programme on a service basis
compared to the revised programme: 
(20.000)
0.000
20.000
40.000
60.000
80.000
100.000
120.000
Corporate Communities
& Housing
Education HSCP Place Other items Total
0.378 0.133
21.106
0.139
37.743
0.000
59.499
£ million
231

Page 232

2.7 The impact on budgeted funding, elements of which are related to the profile of
expenditure reported above, is a reduction of £9.629m from the revised budget,
including: 
Category
Amount
£ million Comments
General Capital Grant (0.071) Rephased and revised contributions
Borrowing (1.115) Rephased aligned to projected
expenditure
Specific Grant (8.241) Rephased and revised contributions
CFCR 0.066 Rephased and revised contributions
Other Grants 0.222 Rephased and revised contributions
Capital Receipts (0.490) Realigned capital receipts
Total Funding Adjustments (9.629)   
2.8 Capital Expenditure to 31 March 2026 
The projections are summarised by service in the following table:   
Service /
Category
Approved
Budget
2025/26
£ million
Carry
Forwards
and
Adjustments
£ million
Revised
Budget
2025/26
£ million
Projected
Expenditure
/ Income to
31 March
2026
£ million
Projected
Variance
Over /
(Under)
£ million
Corporate
Services 0.409 (0.031) 0.378 0.378 0.000
Communities &
Housing 0.866 (0.733) 0.133 0.133 0.000
Education 25.975 (4.869) 21.106 21.106 0.000
HSCP 0.850 (0.711) 0.139 0.139 0.000
Place 41.046 (3.303) 37.743 37.743 0.000
Other Items (0.018) 0.018 (0.000) (0.000) 0.000
Total
Expenditure 69.128 (9.629) 59.499 59.499 0.000
General Grants (10.395) 0.071 (10.324) (10.324) 0.000
Specific Grants (18.570) 8.241 (10.329) (10.329) 0.000
Use of Reserve
Funds 0.000 0.000 0.000 0.000 0.000
CFCR (0.358) (0.066) (0.424) (0.424) 0.000
Capital
Receipts (1.650) 0.490 (1.160) (1.160) 0.000
Other Grants &
Contributions (1.133) (0.222) (1.355) (1.355) 0.000
232

Page 233

Prudential
Borrowing (37.022) 1.115 (35.907) (35.907) 0.000
Total Income (69.128) 9.629 (59.499) (59.499) 0.000 
2.9 Ongoing uncertainty and areas of cost risk remain across a number of projects. While
some mitigation was built into the Capital Programme in the form of flexibility budgets
at February 2025, totalling £23.6m over the next few years, cost pressures may
exceed this provision. To further address this risk, Council approved additional
flexibility of £15.0m from 2026/27 on 25 February 2026. The risk profile however, is
also impacted by recent global events including the middle east conflict which has the
potential to have a significant inflationary effect and current Bank of England forecasts
indicate an increase in interest rates through 2026 is likely. These risks will be
quantified as interest rates are monitored and individual projects are financially
completed and tendering exercises are finalised, with the impact on the costs of the
programme being monitored and reported to Cabinet as appropriate. Projects will
continue to be monitored closely with cost increases met initially from the additional
flexibility built into the programme and considered as part of the closure of the year
end Revenue Budget process. Any requirement for further borrowing not met from a
funding source will be a matter for Council to consider. Information on the progress on
all projects can be found in Appendix 1. 
Housing Revenue Account 
2.10 The following table outlines the movements in the 2025/26 HRA Capital budget: 
Housing Revenue Account  2025/26
£m
Budget as at 31 January 2026 41.958
Alterations to phasing of projects 2025/26 to
2026/27 (6.481)
Alterations to phasing of projects 2026/27 to
2025/26 2.000
Budget as at 31 March 2026 37.477 
2.11 Alterations to the Phasing of Projects 
A review of the timescale for delivery of capital projects has identified a requirement to
re-profile (£6.481m) of works for delivery in 2026/27 and beyond, including: 
Project Amount
£ million
Contingency (3.287)
Acquisitions (open market) (0.327)
Ayrshire Central Site (0.288)
Kings Arms (113-115 High St) (0.257)
Harbourside (0.152)
Garnock Academy Site (0.143)
233

Page 234

Laburnum Avenue (0.108)
Montgomerie Park (0.107)
James McFarlane site (0.065)
Stanecastle Site (0.048)
Total Alterations to New Builds (4.782)
Solar Panels (0.422)
Saltcoats MSF Investment (0.187)
Wallfloor Rendering (0.171)
EWI (0.165)
Roofing (0.144)
Smoke Detector Programme (0.081)
Windows (0.038)
Other Minor Adjustments (0.038)
Total Alterations to Stock Improvements (1.246)
Estate Based Regeneration (0.310)
Lift replacement (0.093)
Sheltered Housing Units (0.050)
Total Alterations to Other Capital Works (0.453)
Alterations 2025/26 to 2026/27 (6.481) 
2.12 This has been partly offset by the acceleration of £2.000m of project expenditure for  
delivery during 2025/26, including: 
Project Amount
£ million
Other Minor Adjustments 0.018
Total Alterations to New Builds 0.018
Kitchens 0.032
Slippage 1.945
Other Minor Adjustments 0.005
Total Alterations to Stock Improvements 1.982
Alterations 2026/27 to 2025/26 2.000 
2.13 These adjustments have resulted in a revised 2025/26 budget at 31 March 2026 of
£37.477m. 
2.14 The impact on budgeted funding is a reduction of (£4.481m) from the approved
budget:
Project Amount
£ million
Capital Grants 4.269
Other Capital Receipts 0.143
Affordable Housing
Contribution (0.272)
Prudential Borrowing (8.621)
TotalFunding Adjustments (4.481)
234

Page 235

2.17 In addition to the adjustments noted above, Appendix 2 highlights proposed virements
which are required from contingency to meet overspends in Management recharges,
and other capital works and from Bathrooms planned to Wet rooms planned to reflect
the composition of works. 
2.18 Cost pressures will continue to be monitored and a review of any potential impact on
the Business Plan and Capital Programme will be undertaken to address any
identified issues. Further information on the progress of all projects can be found in
Appendix 2. 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a) note the revisions to budgets outlined in the report; 
(b) note (i) the General Services and HRA revised budgets at 31 March 2026; and (ii)
the net expenditure to 31 March 2026; 
(c) approve the virement proposal noted within the HRA programme detailed in
appendix 2. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Expenditure will continue to be
closely monitored to ensure early action is taken regarding any projected
underspends or overspends. 
Human Resources 
4.2 None. 
Legal 
4.3. None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
235

Page 236

4.6 This report directly supports the Council Plan 2023 to 2028 by focusing our
investment on priorities, managing risk and supporting delivery of key priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Natalie Graham, Senior Manager Corporate
Finance (Financial Management), on 01294 324533. 
Background Papers
Capital Programme and Treasury Management Performance to 30 June 2025 - Cabinet 2
September 2025
Capital Programme and Treasury Management Performance to 31 August 2025 - Cabinet
28 October 2025
Capital Programme and Treasury Management Performance to 30 November 2025 -
Cabinet 27 January 2026
Capital Programme and Treasury Management Performance to 31 January 2026 - Cabinet
17 March 2026 
236

Page 237

OFFICIAL INFORMATION#
TOTAL PROJECT
Project Description Total Project Budget   Cumulative Expenditure
to date Total Project Forecast   Projected Over/
(Under) Spend   
Total Revised
Budget 2025/26
Brought / Carry
Forward to 2026/27
Total Revised
Budget 2025/26
Actual Expenditure to
31st March 2026
Projected Expenditure
to 31st March 2026
Actual Over/
(Under) Spend for
2025/26
True Over/
(Under) Spend
£ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Education
Nursery Education 4,076,308 4,076,308 4,076,308 0 82,516 0 82,516 82,516 82,516 0 0
Primary Schools 45,767,469 38,500,384 45,767,469 0 2,524,329 (1) 2,524,328 2,524,328 2,524,328 0 0
Secondary Schools 117,358,721 25,407,705 117,358,721 0 17,500,335 0 17,500,335 17,500,335 17,500,335 0 0
Schools Other 1,292,172 1,260,674 1,292,172 0 998,418 1 998,419 998,419 998,419 0 0
SUB TOTAL 168,494,670 69,245,070 168,494,670 0 21,105,598 0 21,105,598 21,105,598 21,105,598 0 0
Communities & Housing
Information & Culture 647,464 139,298 647,464 0 132,736 (0) 132,736 132,736 132,736 0 0
SUB TOTAL 986,269 139,298 986,269 0 132,736 (0) 132,736 132,736 132,736 0 0
Corporate Services
Council IT Strategy 9,832,380 3,754,316 9,832,380 0 378,000 0 378,000 378,000 378,000 0 0
SUB TOTAL 9,832,380 3,754,316 9,832,380 0 378,000 0 378,000 378,000 378,000 0 0
Health & Social Care
Management & Support 1,657,281 874,790 1,657,281 0 139,644 0 139,644 139,644 139,644 0 0
SUB TOTAL 6,265,358 5,470,941 6,265,358 0 139,644 0 139,644 139,644 139,644 0 0
Place
Roads 112,772,041 79,854,249 112,772,041 0 12,469,245 (0) 12,469,245 12,469,245 12,469,245 0 0
Streetscene 5,408,446 3,428,513 5,408,446 0 786,429 0 786,429 786,429 786,429 0 0
Transport 8,761,707 4,029,794 8,761,707 0 3,908,293 (0) 3,908,293 3,908,293 3,908,293 0 0
Waste Services 13,492,976 13,444,027 13,492,976 0 171,485 0 171,485 171,485 171,485 0 0
Renewable Energy 15,956,436 15,743,235 15,956,436 0 2,367,742 (0) 2,367,742 2,367,742 2,367,742 0 0
Office Accommodation 1,785,731 1,090,217 1,785,731 0 1,090,218 (1) 1,090,217 1,090,217 1,090,217 0 0
Other Property 4,490,577 3,356,587 4,490,577 0 2,507,135 (0) 2,507,135 2,507,135 2,507,135 0 0
Economic Development & Regenerat 196,686,417 90,731,629 196,686,417 0 14,265,301 1 14,265,302 14,265,302 14,265,302 0 0
Completed Projects 6,508,081 6,508,081 6,508,081 0 177,088 0 177,088 177,088 177,088 0 0
SUB TOTAL 365,862,412 218,186,330 365,862,412 0 37,742,936 (0) 37,742,936 37,742,936 37,742,936 0 0
Other
Other 24,858,909 0 24,858,909 0 0 0 0 0 0 0 0
SUB TOTAL 24,858,909 0 24,858,909 0 0 0 0 0 0 0 0
Total Project Expenditure 576,299,998 296,795,956 576,299,998 0 59,498,914 0 59,498,914 59,498,914 59,498,914 0 0
Total Project Income (59,498,914) (0) (59,498,914) (59,498,914) (59,498,914) 0 0
Total Net Expenditure 0 0 0 0 (0) 0 0
On Target (+0.5% of budget)
Slightly off target  (+ 0.5% to 2% of budget, or £0.125m, whichever is less)
Significantly off target (+2% or more of budget, or £0.500m, whichever is less)
The following classifications have been used to highlight financial performance
against budget
CURRENT YEAR 2025/26
North Ayrshire Council Capital Statement 2025/26
Year Ended 31st March 2026
Period 12
The following classifications have been used to
highlight delivery performance against original
timescales set
# OFFICIAL INFORMATION
237

Page 238

OFFICIAL INFORMATION#
Revised Budget
25/26 Variance
£ £ £ £ £ £ £ £ £
CAPITAL BORROWING
Prudential Borrowing 54,463,198 16,882,663 2,656,651 74,002,512 (47,076,362) 8,979,671 35,905,821 35,905,822 35,905,822 1
SUB TOTAL 54,463,198 16,882,663 2,656,651 74,002,512 (47,076,362) 8,979,671 35,905,821 35,905,822 35,905,822 1
SCOTTISH GOVERNMENT FUNDING
Specific Capital Grants
Local Authority Direct Award 41,337 41,337 41,337 41,337 (0)
Vacant & Derelict Land Funding 3,397,568 238,809 358,499 3,994,876 (3,924,982) 69,894 69,894 69,894 0
Scottish Government Grant - AGD Great Harbour Ph 1 2,737,842 (29,141) 451,870 3,160,571 (302,732) 2,857,839 2,857,839 2,857,839 (0)
UK Government Grant - AGD DPMC Ph 1 (337,440) 1,000,000 662,560 662,560 662,560 (0)
Ardrossan Promenade 0 1,307 1,307 (1) 1,306 1,306 1,306 0
Islands Pit Stops 0 67,540 440,000 507,540 (473,766) 33,774 33,774 33,774 0
Place Based Investment Programme 316,043 136,857 251,385 704,285 (582,917) 121,368 121,368 121,368 (0)
UK Government Grant - B714 Improvements 17,553,389 (229,290) 17,324,099 (13,206,034) 4,118,065 4,118,065 4,118,065 (0)
UK Government Ayrshire 5GIR 0 281,711 281,711 575,000 856,711 856,711 856,711 0
UK Government - Local Regeneration Fund Funding Commercial & 0 0 573,703 139,304 713,007 713,007 713,007 (0)
Road Safety Improvement Fund 404,314 404,314 404,314 404,314 0
20 mph Implementation 448,281 448,281 448,281 448,281 0
Capital Grants
Flooding (2,206,000) (2,206,000) 0 (2,206,000) 0 0 2,206,000
General Capital Grant 10,573,000 (454,000) 10,119,000 1,958,395 454,000 12,531,395 10,325,395 10,325,395 (2,206,000)
SUB TOTAL 39,038,920 687,972 1,047,754 40,774,646 (15,337,544) (4,783,251) 20,653,851 20,653,850 20,653,850 (1)
CFCR 0 0 0 0 423,908 0 423,908 423,908 423,908 (0)
General CFCR 0 (56,180) (56,180) (56,180) (56,180)
Vehicles 0 70,650 70,650 70,650 70,650
Locality Based Property Review 0 49,000 49,000 49,000 49,000
Salt Dome Goldcraigs 0 115,000 115,000 115,000 115,000
Street Furniture 0 2,161 2,161 2,161 2,161
Waste Compactors 0 171,485 171,485 171,485 171,485
AGD - GH Phase 2 Maritime Mile 0 9,792 9,792 9,792 9,792
AGD - Marine Tourism Arran 0 12,750 12,750 12,750 12,750
AGD - Marine Tourism Cumbrae 0 12,750 12,750 12,750 12,750
Great Harbour Phase 1 0 36,500 36,500 36,500 36,500
Grants & Contributions 101,099 99,437 85,000 285,536 1,069,080 0 1,354,616 1,354,617 1,354,617 1
Quarry Road Phase 1 - IRBC 0 19,827 19,827 0 19,827 19,827 19,827 0
AGD - Great Harbour - Sustrans 0 0 (10) (10) (10) (10) 0
AGD - Great Harbour - FCC Communities Foundation 0 0 40,000 40,000 40,000 40,000 0
AGD - Great Harbour - Sportscotland 0 0 135,000 135,000 135,000 135,000 0
AGD - Great Harbour - LT Funding 0 0 40,000 40,000 40,000 40,000 0
B777 Corridor Improvements - Active Travel Tier 2 0 0 25,995 25,995 25,995 25,995 0
Old Caledonian Railway Saltcoats Ph 2 - Active Travel Tier 2 49,979 49,979 49,979 49,979 0
B714 Sharphill to NCN AT Route - Active Travel Tier 2 170,321 170,321 170,321 170,321 0
Cumbrae AT Route - Active Travel Tier 2 49,963 49,963 49,963 49,963 0
Girdle Toll to Irvine Town AT Route - Active Travel Tier 2 77,909 77,909 77,909 77,909 (0)
Irvine to Drybridge AT Route - Active Travel Tier 2 8,000 8,000 8,000 8,000 0
Links to Eglinton Park - Active Travel Tier 2 0 0 105,800 105,800 105,800 105,800 0
NCN7 Valefield/Glengarnock Bridge - Walk Wheel Cycle Trust 0 0 60,959 60,959 60,959 60,959 0
Panel Reinstatement Works 0 40,189 40,189 0 40,189 40,189 40,189 0
Roads Remediation Works 0 39,651 39,651 (3,023) 36,628 36,628 36,628 0
NCN7 Crossing Improvements Walk Wheel Cycle Trust 39,724 39,724 39,724 39,724 0
Brodick Tennis Courts - LTA Tennis Foundation 0 80,235 80,235 80,235 80,235 0
Brodick Tennis Courts - KA Leisure Contribution 52,500 52,500 52,500 52,500 0
UFSM West Kilbride PS - Persimmons Contribution 50,000 50,000 50,000 50,000 0
Depot Charging Scheme - Department of Transport 271,597 271,597 271,597 271,597 (0)
Capital Receipts 1,500,000 837,950 0 2,337,950 (1,190,042) 12,810 1,160,718 1,160,718 1,160,718 (0)
Sale of Land and Buildings 1,500,000 837,950 2,337,950 (1,515,140) 12,810 835,620 835,620 835,620
Sale of Vehicles 0 0 73,257 73,257 73,257 73,257
Insurance Recoveries (Vehicles) 0 0 24,345 24,345 24,345 24,345
Salt Dome - Insurance Recovery 227,496 227,496 227,496 227,496
SUB TOTAL 2,304,806 937,387 (618,707) 2,623,486 302,946 12,810 2,939,242 2,939,243 2,939,243 1
TOTAL CAPITAL PROGRAMME FUNDING 95,806,924 18,508,022 3,085,698 117,400,644 (62,110,960) 4,209,230 59,498,914 59,498,914 59,498,914 0
Approved Budget
at Cabinet Feb
2025
Capital Programme Funding 2025/26
Projected Income
to 31st March
2026
Approved budget
at Period 1 used
as revised starting
point 2025/26
Actual Income to
31st March 2026Funding Description
Carry Forward
from 2024/25
Changes after
Capital Refresh Feb
2025
Total Changes in
Year
Changes at Capital
Refresh Feb 2026
# OFFICIAL INFORMATION
238

Page 239

OFFICIAL INFORMATION#
EDUCATION
MILESTONE
Total Project Budget  Cumulative
Expenditure to date 
Total Project
Forecast            
Projected Over/
(Under) Spend      
Total Revised Budget
2025/26
Actual Expenditure
to 31st March 2026
Actual Over/ (Under)
Spend for 2025/26
True Over/(Under)
Spend            
Brought / Carry
Forward to 2026/27 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Nursery Education
Early Years Programme
MARRESS HOUSE 4,076,308 4,076,308 4,076,308 0 82,516 82,516 0 0 Complete Complete Complete Complete Complete
Total Nursery Education 4,076,308 4,076,308 4,076,308 0 82,516 82,516 0 0 0
Primary Schools
MOORPARK PRIMARY 14,885,024 14,885,024 14,885,024 0 2,137,057 2,137,057 (0) (0) Complete Complete Complete Complete Complete
MONTGOMERIE PARK SCHOOL 22,848,999 22,164,969 22,848,999 0 18,256 18,256 (0) (0) Complete Complete Complete Complete Complete
FAIRLIE PRIMARY SCHOOL 542,444 100,712 542,444 0 95,712 95,712 (0) (0) 31-Aug-26 31-Aug-26 Feasibility On Target On Target
UFSM ARDEER PRIMARY SCHOOL 17,634 16,851 17,634 0 812 813 1 1 Complete Complete Complete Complete Complete
UFSM CORSEHILL PRIMARY SCHOOL 147,940 147,940 147,940 0 10,725 10,725 0 0 Complete Complete Complete Complete Complete
UFSM GARNOCK COMMUNITY CAMPUS 54,043 54,043 54,043 0 38 38 (0) (0) Complete Complete Complete Complete Complete
UFSM HAYOCKS PRIMARY SCHOOL 94,984 94,984 94,984 0 1,941 1,941 (1) (1) Complete Complete Complete Complete Complete
UFSM LOUDOUN-MONTGOMERY PRIMARY SCHOOL 2,082,541 128,972 2,082,541 0 77,510 77,510 (0) (0) 31-Dec-26 31-Dec-26 Feasibility On Target On Target
UFSM WEST KILBRIDE PRIMARY SCHOOL 4,047,764 413,700 4,047,764 0 181,921 181,921 0 0 31-Aug-27 31-Aug-27 On Site On Target On Target
UFSM WHITEHIRST PARK PRIMARY 52,893 52,894 52,893 0 357 357 0 0 Complete Complete Complete Complete Complete
Total Primary Education 45,767,469 38,500,384 45,767,469 0 2,524,329 2,524,328 (1) 0 (1) 
Secondary Schools
KILWINNING LEARNING ENVIRONMENT 2,770,121 2,770,120 2,770,121 0 2,534 2,534 (0) (0) Complete Complete Complete Complete Complete
ARDROSSAN NEW BUILD 114,588,600 22,637,585 114,588,600 0 17,497,801 17,497,801 0 0 Autumn 2027 Winter 2027 On Site Slightly off target  Slightly off target 
Total Secondary Education 117,358,721 25,407,705 117,358,721 0 17,500,335 17,500,335 0 0 0
Schools Other
CO2 MONITORS IN SCHOOLS 298,000 266,501 298,000 0 4,246 4,246 0 0 31-Mar-26 31-Mar-26 Planning On Target On Target
SCHOOLS ICT INVESTMENT * 994,172 994,172 994,172 0 994,172 994,172 0 0 31-Mar-26 31-Mar-26 On-going On Target On Target
Total Schools Other 1,292,172 1,260,674 1,292,172 0 998,418 998,419 1 0 1
Total Education 168,494,670 69,245,070 168,494,670 0 21,105,598 21,105,598 0 0 0
CAPITAL MONITORING 2025/26
CommentsProject Description
TOTAL PROJECT COMPLETION DATES DELIVERY STATUS2025/26 BUDGETS
# OFFICIAL INFORMATION
239

Page 240

OFFICIAL INFORMATION#
COMMUNITIES & HOUSING
MILESTONE
Total Project Budget  Cumulative
Expenditure to date 
Total Project
Forecast            
Projected Over/
(Under) Spend      
Total Revised Budget
2025/26
Actual Expenditure
to 31st March 2026
Actual Over/ (Under)
Spend for 2025/26
True Over/(Under)
Spend            
Brought / Carry
Forward to 2026/27 Original Target Revised Forecast Current Project Stage Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Information & Culture
BRODICK TENNIS COURTS 153,055 132,736 153,055 0 132,736 132,736 (0) (0) 30-Sep-25 31-May-26 Construction On Target On Target
Total Information & Cultural 647,464 139,298 647,464 0 132,736 132,736 (0) 0 (0)
Total Communities & Housing 986,269 139,298 986,269 0 132,736 132,736 (0) 0 (0)
Comments
CAPITAL MONITORING 2025/26
Project Description
TOTAL PROJECT 2025/26 BUDGETS COMPLETION DATES DELIVERY STATUS
# OFFICIAL INFORMATION
240

Page 241

OFFICIAL INFORMATION#
CORPORATE SERVICES
MILESTONE
Total Project Budget       
Cumulative
Expenditure to
date            
Total Project
Forecast        
Projected Over/
(Under) Spend  
Total Revised Budget
2025/26
Actual
Expenditure to
31st March 2026
Actual Over/
(Under) Spend for
2025/26
True Over/(Under)
Spend            
Brought / Carry
Forward to
2026/27
Original Target Revised Forecast Current Project
Stage
Delivery Status
Financial Delivery Status Physical
£ £ £ £ £ £ £ £ £
Council IT Strategy
ICT INVESTMENT FUND 4,915,581 1,870,326 4,915,581 0 358,403 358,403 0 0 31-Mar-26 31-Mar-26 On-going On Target On Target
TELEPHONY 303,693 298,883 303,693 0 19,597 19,597 0 0 31-Mar-28 31-Mar-28 Implementation On Target On Target
Total IT Strategy 9,832,380 3,754,316 9,832,380 0 378,000 378,000 0 0 0
Total Corporate Services 9,832,380 3,754,316 9,832,380 0 378,000 378,000 0 0 0   
CAPITAL MONITORING 2025/26
CommentsProject Description
COMPLETION DATESTOTAL PROJECT DELIVERY STATUS2025/26 BUDGETS
# OFFICIAL INFORMATION
241

Page 242

OFFICIAL INFORMATION#
HEALTH & SOCIAL CARE
MILESTONE
Total Project
Budget        
Cumulative
Expenditure to date    Total Project Forecast  Projected Over/
(Under) Spend        
Total Revised Budget
2025/26
Actual Expenditure
to 31st March 2026
Actual Over/
(Under) Spend for
2025/26
True Over/(Under)
Spend            
Brought / Carry
Forward to 2026/27 Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
Management & Support
ECLIPSE 536,058 382,993 536,058 0 139,644 139,644 0 0 14-Jan-27 31-Mar-27 Construction On Target On Target
Total Health & Social Care 6,265,358 5,470,941 6,265,358 0 139,644 139,644 0 0 0
CAPITAL MONITORING 2025/26
2025/26 BUDGETSTOTAL PROJECT COMPLETION DATES
CommentsProject Description
DELIVERY STATUS
# OFFICIAL INFORMATION
242

Page 243

OFFICIAL INFORMATION#
PLACE
MILESTONE
Total Project Budget       Cumulative
Expenditure to date   Total Project Forecast   Projected Over/
(Under) Spend        
Total Revised Budget
2025/26
Actual
Expenditure to
31st March 2026
Actual Over/
(Under) Spend for
2025/26
True
Over/(Under)
Spend        
Brought / Carry
Forward to
2026/27
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
£ £ £ £ £ £ £ £ £
Roads
ROADS IMPROVE/RECONSTRUCTION * 3,853,578 3,853,578 3,853,578 0 3,853,578 3,853,578 (0) (0) 31-Mar-26 31-Mar-26 Multiple Projects On Target On Target 
ROAD SAFETY IMPROVEMENT FUND 404,314 404,314 404,314 0 404,314 404,314 0 0 Complete Complete Complete Complete Complete
ROADS REMEDIATION WORKS 36,628 36,628 36,628 0 36,628 36,628 0 0 31-Mar-26 31-Mar-26 In Development On Target On Target
20MPH IMPLEMENTATION 448,281 448,281 448,281 0 448,281 448,281 0 0 Complete Complete Complete Complete Complete
LIGHTING * 900,727 900,727 900,727 0 900,727 900,727 (0) (0) 31-Mar-26 31-Mar-26 Multiple Projects On Target On Target 
UPPER GARNOCK FPS 18,579,086 18,579,085 18,579,086 0 205,336 205,336 (0) (0) Complete Complete Complete Complete Complete
MILLPORT COASTAL FPS 41,794,797 41,794,797 41,794,797 0 984,849 984,849 0 0 Complete Complete Complete Complete Complete
MILLBURN FPS 4,684,650 1,570,825 4,684,650 0 1,197,211 1,197,211 (0) (0) 31-Jul-26 31-Jul-26 Tender On Target On Target
BRIDGES INFRASTRUCTURE PROG * 272,605 272,605 272,605 0 272,605 272,605 0 0 31-Mar-26 31-Mar-26 Multiple Projects On Target On Target 
LARGS PROMENADE SEAWALL 4,698,482 4,698,483 4,698,482 0 6,581 6,581 0 0 Complete Complete Complete Complete Complete
COASTAL ADAPTATIONS 315,000 41,070 315,000 0 41,070 41,070 0 0 31-Mar-29 31-Mar-29 In Development On Target On Target
B714 UPGRADE 34,749,635 7,023,752 34,749,635 0 4,118,065 4,118,065 (0) (0) 31-Aug-27 31-Aug-27 Tender On Target On Target
Total Roads 112,772,041 79,854,249 112,772,041 0 12,469,245 12,469,245 (0) 0 (0)
Streetscene
CMTY, KILBIRNIE - WALLS 119,675 119,675 119,675 0 700 700 0 0 Complete Complete Complete Complete Complete
CMTY, BEITH - WALLS 162,395 162,395 162,395 0 760 760 0 0 Complete Complete Complete Complete Complete
CMTY, ABBEY TOWER - WALLS 159,357 159,357 159,357 0 37,484 37,484 (0) (0) Complete Complete Complete Complete Complete
CMTY, STEV HAWKHILL - WALLS 89,670 89,670 89,670 0 4,291 4,291 0 0 Complete Complete Complete Complete Complete
CMTY, WEST KILBRIDE - WALLS 110,397 110,397 110,397 0 35,592 35,592 0 0 Complete Complete Complete On Target On Target
CMTY, IRVINE OP CHURCH - WALLS 15,243 6,998 15,243 0 4,223 4,223 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, DREGHORN - WALLS 19,227 19,227 19,227 0 5,676 5,676 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, STEV HIGH KIRK - WORKS 30,802 25,732 30,802 0 1,028 1,028 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, KILBIRNIE - NEW 1,501,663 554,521 1,501,663 0 426,013 426,013 0 0 30-Sep-25 30-Sep-26 Tender Awarded On Target On Target
CMTY, ARDROSSAN - EXTENSION 1,000 1,000 1,000 0 1,000 1,000 0 0 Future years Future years Feasibility Works On Target On Target
CMTY, NEW STREET STEV - WALLS 1,515 1,515 1,515 0 1,515 1,515 0 0 Complete Complete Complete Complete Complete
STREET FURNITURE IMPROVEMENT 225,511 225,511 225,511 0 2,585 2,585 0 0 31-Mar-26 31-Mar-26 Planning On Target On Target
PARK ENABLING WORKS 149,895 149,415 149,895 0 1,700 1,700 0 0 31-Mar-26 31-Mar-26 Planning On Target On Target
RENEWAL OF PLAY PARKS 1,411,000 849,665 1,411,000 0 263,862 263,862 0 0 31-Mar-27 31-Mar-27 Construction On Target On Target
Total Streetscene 5,408,446 3,428,513 5,408,446 0 786,429 786,429 0 0 0
Transport
VEHICLES * 3,409,343 3,409,343 3,409,343 0 3,409,343 3,409,343 (0) (0) 31-Mar-26 31-Mar-26 Ongoing On Target On Target 
FLEET DECARBONISATION 5,352,364 620,451 5,352,364 0 498,950 498,950 0 0 31-Mar-26 31-Mar-26 Ongoing On Target On Target
Total Transport 8,761,707 4,029,794 8,761,707 0 3,908,293 3,908,293 (0) 0 (0)
Waste Services
WASTE COMPACTORS 171,485 171,485 171,485 0 171,485 171,485 0 0 Complete Complete Complete Complete Complete
Total Waste Services 13,492,976 13,444,027 13,492,976 0 171,485 171,485 0 0 0
Renewable Energy
SOLAR PV INVESTMENT - NETHERMAINS 8,290,950 8,290,950 8,290,950 0 887,693 887,693 (0) (0) Complete Complete Complete Complete Complete
SOLAR PV INVESTMENT - SHEWALTON 5,954,484 5,915,974 5,954,484 0 1,025,813 1,025,813 (0) (0) Complete Complete Complete Complete Complete
NON DOMESTIC ENERGY EFFICIENCY PROGRAMME 1,000,001 1,000,001 1,000,001 0 45,951 45,951 0 0 Complete Complete Complete Complete Complete
NATURE RESTORATION FUND 711,001 536,309 711,001 0 408,285 408,285 (0) (0) 31-Aug-24 31-Mar-26 Planning On Target On Target 
Total Renewable Energy 15,956,436 15,743,235 15,956,436 0 2,367,742 2,367,742 (0) 0 (0)
Office Accommodation
PLI GOWANLEA DAY SERVICES 28,844 28,843 28,844 0 28,844 28,843 (1) (1) Complete Complete Complete Complete Complete
PLI CENTRAL AVE STREETSCENE DEPOT 3,825 3,825 3,825 0 3,825 3,825 0 0 Complete Complete Complete Complete Complete
PLI GOLDCRAIGS DEPOT 169,887 13,265 169,887 0 13,265 13,265 0 0 Complete Complete Complete Complete Complete
PLI CALEDONIA PRIMARY 670,765 332,410 670,765 0 332,410 332,410 (0) (0) 31-Mar-26 30-Jun-26 Construction On Target On Target
PLI DALRY PRIMARY SCHOOL 220,000 22,756 220,000 0 22,756 22,756 (0) (0) 19-Dec-25 31-Aug-26 Construction On Target On Target
PLI FAIRLIE PRIMARY SCHOOL 7,531 7,531 7,531 0 7,531 7,531 (0) (0) Complete Complete Complete Complete Complete
Comments
CAPITAL MONITORING 2025/26
COMPLETION DATES
Project Description
TOTAL PROJECT 2025/26 BUDGETS DELIVERY STATUS
# OFFICIAL INFORMATION
243

Page 244

OFFICIAL INFORMATION#
PLACE
MILESTONE
Total Project Budget       Cumulative
Expenditure to date   Total Project Forecast   Projected Over/
(Under) Spend        
Total Revised Budget
2025/26
Actual
Expenditure to
31st March 2026
Actual Over/
(Under) Spend for
2025/26
True
Over/(Under)
Spend        
Brought / Carry
Forward to
2026/27
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Comments
CAPITAL MONITORING 2025/26
COMPLETION DATES
Project Description
TOTAL PROJECT 2025/26 BUDGETS DELIVERY STATUS
PLI HAYOCKS PRIMARY SCHOOL 373,262 369,970 373,262 0 369,970 369,970 0 0 Complete Complete Complete Complete Complete
PLI SKELMORLIE PRIMARY SCHOOL 1,942 1,942 1,942 0 1,942 1,942 0 0 Complete Complete Complete Complete Complete
PLI ST LUKES PRIMARY SCHOOL 21,477 21,477 21,477 0 21,477 21,477 (0) (0) Complete Complete Complete Complete Complete
PLI ST WINNINGS PRIMARY SCHOOL 27,333 27,333 27,333 0 27,333 27,333 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE PRIMARY SCHOOL 94,562 94,562 94,562 0 94,562 94,562 0 0 Complete Complete Complete Complete Complete
PLI ARDROSSAN ACADEMY 54,005 54,005 54,005 0 54,005 54,005 (0) (0) Complete Complete Complete Complete Complete
PLI AUCHENHARVIE ACADEMY* 269 269 269 0 269 269 (0) (0) Complete Complete Complete Complete Complete
PLI KILWINNING ACADEMY 21,134 21,134 21,134 0 21,134 21,134 0 0 Complete Complete Complete Complete Complete
PLI WEST KILBRIDE EARLY YEARS 3,232 3,232 3,232 0 3,232 3,232 (0) (0) Complete Complete Complete Complete Complete
PLI ARRAN OUTDOOR CENTRE 5,181 5,181 5,181 0 5,181 5,181 (0) (0) Complete Complete Complete Complete Complete
PLI ANAM CARA 50 50 50 0 50 50 0 0 Complete Complete Complete Complete Complete
PLI BRODICK HWRC 21,505 21,505 21,505 0 21,505 21,505 0 0 Complete Complete Complete Complete Complete
PLI THE PORTAL 48,132 48,132 48,132 0 48,132 48,132 0 0 Complete Complete Complete Complete Complete
PLI IRVINE WASTE TRANSFER 12,795 12,795 12,795 0 12,795 12,795 0 0 Complete Complete Complete Complete Complete
Total Office Accommodation 1,785,731 1,090,217 1,785,731 0 1,090,218 1,090,217 (1) 0 (1)
Other Property
LBPR - TRINITY CHURCH 1,490 1,490 1,490 0 630 630 0 0 Complete Complete Complete Complete Complete
LBPR IRVINE LIBRARY 50,967 50,968 50,967 0 12,893 12,893 0 0 Complete Complete Complete Complete Complete
LBPR BRIDGEGATE HOUSE 2,172 2,172 2,172 0 197 197 0 0 Complete Complete Complete Complete Complete
LBPR CUNNINGHAME HOUSE 238,000 109,292 238,000 0 51,739 51,739 (0) (0) 31-Mar-27 31-Mar-27 Construction On Target On Target
LBPR CUNNINGHAME HOUSE GRD EAST/4TH WEST 1,248,118 1,095,545 1,248,118 0 1,012,179 1,012,179 0 0 31-Mar-26 30-May-26 Construction On Target On Target
LBPR CUNNINGHAME HOUSE GRD WEST 201,777 173,673 201,777 0 9,583 9,583 0 0 Complete Complete Complete Complete Complete
LBPR - THE TOWNHOUSE 25,000 9,360 25,000 0 5,781 5,780 (1) (1) 31-Jul-25 30-Apr-26 Construction On Target On Target
LBPR THE CIRCUIT 311,571 248,327 311,571 0 227,379 227,379 (0) (0) 31-Mar-27 30-May-26 Construction On Target On Target
EMERGENCY CONTROL CTR 158,000 153,438 158,000 0 (1,451) (1,451) 0 0 Complete Complete Complete Complete Complete
GOLDCRAIGS REFURBISHMENT 1,163,495 1,035,446 1,163,495 0 841,689 841,688 (1) (1) Complete Complete Complete Complete Complete
SALT DOME GOLDCRAIGS 346,516 346,516 346,516 0 346,516 346,516 0 0 31-Mar-26 31-Mar-26 Planning On Target On Target
Total Property 4,490,577 3,356,587 4,490,577 0 2,507,135 2,507,135 (0) 0 (0)   
Regeneration
ISLANDS PIT STOPS 218,321 33,774 218,321 0 33,774 33,774 0 0 31-Jul-25 31-Jul-26 In development On Target On Target
PLACE BASED INVESTMENT PROGRAMME (PBIP) 225,551 49,373 225,551 0 18,596 18,596 0 0 31-Mar-27 31-Mar-27 In development On Target On Target
AYRSHIRE 5GIR 4,366,000 4,366,000 4,366,000 0 856,711 856,711 0 0 Complete Complete Complete Complete Complete
PBIP – KILWINNING ABBEY IMPROVEMENTS 264,559 55,016 264,559 0 54,660 54,660 (0) (0) 31-Mar-25 31-Dec-26 Construction On Target On Target
LOCHSHORE HUB PLAY AREA 355,000 303,592 355,000 0 4,838 4,838 (0) (0) Complete Complete Complete Complete Complete
PBIP GALT HOUSE 49,444 49,444 49,444 0 8,328 8,328 0 0 Complete Complete Complete Complete Complete
IRVINE HIGH STREET 2,837,315 2,738,228 2,837,315 0 211 211 0 0 Complete Complete Complete Complete Complete
MONTGOMERIE PARK MASTERPLAN 4,218,597 1,959,236 4,218,597 0 87,845 87,845 0 0 31-Mar-30 31-Mar-30 In development On Target On Target
LOCHSHORE, KILBIRNIE 2,101,881 2,015,480 2,101,881 0 30,424 30,424 0 0 31-May-25 01-Dec-26 In development On Target On Target
LOCHSHORE GARNOCK HUB 4,170,999 4,110,507 4,170,999 0 11,938 11,938 0 0 Complete Complete Complete Complete Complete
VDLF - KYLE ROAD PHASE 2 4,525,506 190,782 4,525,506 0 41,627 41,627 0 0 31-Mar-27 31-Mar-28 In development On Target On Target
VDLF - ANNICKBANK PH 3 1,948,996 1,944,450 1,948,996 0 5,919 5,919 (0) (0) Complete Complete Complete Complete Complete
LUF3 - ANNICKBANK 6,074,602 140,661 6,074,602 0 60,566 60,566 (0) (0) 31-Mar-27 31-Mar-28 In development On Target On Target
LOCHSHORE GARDEN/ACTIVITY HUB 827,075 44,917 827,075 0 44,917 44,917 0 0 31-Dec-26 31-Dec-26 In development On Target On Target
PBIP DOCKHEAD STREET 250,000 8,358 250,000 0 8,358 8,358 0 0 31-Mar-26 31-Mar-27 In development On Target On Target
PBIP HAYOCKS HALL COMMUNITY LARDER 32,500 806 32,500 0 806 806 0 0 31-Mar-27 31-Mar-27 In development On Target On Target
PBIP CRANBERRY MOSS COMMUNITY CENTRE 32,500 131 32,500 0 131 131 0 0 31-Mar-27 31-Mar-27 In development On Target On Target
PBIP EGLINTON PARK IMPROVEMENTS 10,000 833 10,000 0 833 833 0 0 31-Mar-27 31-Mar-27 In development On Target On Target
ACTIVE TRAVEL TIER 1 848,823 3,779,771 848,823 0 848,823 848,823 0 0 31-Mar-26 31-Mar-27 Various On Target On Target
ACCESS PATH NETWORK PROGRAMME 77,906 77,906 77,906 0 77,906 77,906 (0) (0) 31-Mar-26 31-Mar-27 Various On Target On Target
LOCAL AUTHORITY DIRECT AWARD 41,337 41,337 41,337 0 41,337 41,337 0 0 Complete Complete Complete Complete Complete
ARDROSSAN PROMENADE 1,206 787,900 1,206 0 1,206 1,206 0 0 Complete Complete Complete Complete Complete
B777 CORRIDOR IMPROVEMENTS 137,766 137,766 137,766 0 25,995 25,995 0 0 Complete Complete Complete Complete Complete
SALTCOATS OLD CAL RAILWAY PH2 49,979 49,979 49,979 0 49,979 49,979 0 0 Complete Complete Complete Complete Complete
BUS INFRASTRUCTURE FUND 288,000 246,993 288,000 0 246,993 246,993 0 0 31-Mar-26 30-Jun-26 Construction On Target On Target
NCN7 CROSSING IMPROVEMENTS 39,724 39,724 39,724 0 39,724 39,724 0 0 Complete Complete Complete Complete Complete
# OFFICIAL INFORMATION
244

Page 245

OFFICIAL INFORMATION#
PLACE
MILESTONE
Total Project Budget       Cumulative
Expenditure to date   Total Project Forecast   Projected Over/
(Under) Spend        
Total Revised Budget
2025/26
Actual
Expenditure to
31st March 2026
Actual Over/
(Under) Spend for
2025/26
True
Over/(Under)
Spend        
Brought / Carry
Forward to
2026/27
Original Target Revised Forecast Current Project Stage Delivery Status
Financial
Delivery Status
Physical
Comments
CAPITAL MONITORING 2025/26
COMPLETION DATES
Project Description
TOTAL PROJECT 2025/26 BUDGETS DELIVERY STATUS
B714 SHARPHILL TO NCN AT ROUTE 170,321 170,321 170,321 0 170,321 170,321 0 0 Complete Complete Complete Complete Complete
CUMBRAE AT ROUTE 49,963 49,963 49,963 0 49,963 49,963 0 0 Complete Complete Complete Complete Complete
GIRDLE TOLL TO IRVINE TOWN AT ROUTE 77,909 77,909 77,909 0 77,909 77,909 (0) (0) Complete Complete Complete Complete Complete
IRVINE TO DRYBRIDGE AT ROUTE 8,000 8,000 8,000 0 8,000 8,000 0 0 Complete Complete Complete Complete Complete
LINKS TO EGLINTON PARK 273,976 273,976 273,976 0 105,800 105,800 0 0 Complete Complete Complete Complete Complete
NCN7 VALEFIELD/GLENGARNOCK BRIDGE 64,460 64,460 64,460 0 60,960 60,960 (1) (1) Complete Complete Complete Complete Complete
LONG DRIVE 956,620 349,573 956,620 0 349,573 349,573 (0) (0) 31-Mar-26 31-May-26 Construction On Target On Target
RIVERSIDE WAY 867,180 5,662 867,180 0 5,662 5,662 (0) (0) 31-Mar-26 31-Aug-26 In development On Target On Target
STRATEGIC INVESTMENT ROUTE 2,386,826 188,667 2,386,826 0 188,667 188,667 (1) (1) 31-Mar-27 31-Mar-27 Construction On Target On Target
KYLE ROAD AT ROUTE 1,073,678 64,111 1,073,678 0 64,111 64,111 0 0 31-Mar-26 31-Aug-26 In development On Target On Target
Total Regeneration 50,258,442 30,026,340 50,258,442 0 3,683,411 3,683,411 0 0 0
Ayrshire Growth Deal
AGD - I3 DPMC PHASE 1 1,000,000 662,560 1,000,000 0 389,871 389,871 0 0 31-Mar-26 31-Mar-26 Delivery On Target On Target
AGD - I3 DPMC PHASE 2 6,225,000 336,924 6,225,000 0 22,557 22,557 (0) (0) 31-Mar-29 31-Mar-30 Feasibility On Target On Target
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 1 4,897,985 4,897,985 4,897,985 0 53,084 53,084 0 0 Complete Complete Complete Complete Complete
AGD - I3 FLEXIBLE BUSINESS SPACE PHASE 2 6,156,259 487,209 6,156,259 0 131,559 131,559 0 0 31-Mar-29 31-Mar-29 Multiple Projects On Target On Target
AGD - HUNTERSTON - CENTRE OF LOW CARBON ENERGY &
CIRCULARECONOMY
12,040,000 302,730 12,040,000 0 34,997 34,997 0 0 31-Mar-30 30-Nov-30 Feasibility On Target Slightly off target 
AGD - GH PHASE 1 COASTAL HUB 4,873,946 4,589,852 4,873,946 0 3,079,024 3,079,024 (0) (0) 31-Mar-29 31-Mar-27 Delivery On Target On Target
AGD - GH PHASE 2 MARITIME MILE 7,996,866 111,812 7,996,866 0 111,812 111,812 0 0 31-Mar-29 31-Mar-29 Design On Target On Target
AGD - IMSE 15,275,000 243,166 15,275,000 0 68,559 68,559 0 0 31-Mar-30 31-Mar-30 Feasibility On Target On Target
AGD - MARINE TOURISM ARRAN 4,571,992 293,108 4,571,992 0 86,348 86,348 (0) (0) 31-Mar-29 31-Mar-30 Feasibility On Target Significantly off
t tAGD - MARINE TOURISM CUMBRAE 4,796,278 310,180 4,796,278 0 103,795 103,795 0 0 31-Mar-29 31-Mar-30 Design On Target Significantly off
t tAGD -BUILDING DIGITAL CAPITAL 4,630,000 11,882 4,630,000 0 11,882 11,882 0 0 31-Mar-30 31-Mar-30 Design On Target On Target
Total Ayrshire Growth Deal 82,108,625 12,523,125 82,108,625 0 4,093,488 4,093,489 1 0 1
Growth & Investment
ARDROSSAN HARBOUR INTERCHANGE 4,127,113 607,991 4,127,113 0 5,511 5,511 (0) (0) 1st Qtr 2026 TBC Design On Hold On Hold
ARDROSSAN NORTH SHORE 48,888,716 47,158,412 48,888,716 0 6,479,171 6,479,171 (0) (0) Complete Complete Complete Complete Complete
VDLF - HARBOUR MASTERS OFFICE 158,740 158,740 158,740 0 3,720 3,720 0 0 Complete Complete Complete Complete Complete
Other Growth & Investment 64,319,350 48,182,164 64,319,350 0 6,488,402 6,488,402 (0) 0 (0)
Total Economic Development & Regeneration 196,686,417 90,731,629 196,686,417 0 14,265,301 14,265,302 1 0 1
Completed Projects
QUARRY ROAD PHASE 1 3,129,917 3,129,918 3,129,917 0 177,088 177,088 0 0 Complete Complete Defects Period Complete Complete
Total Completed Projects 6,508,081 6,508,081 6,508,081 0 177,088 177,088 0 0 0
Total Place 365,862,412 218,186,330 365,862,412 0 37,742,936 37,742,936 (0) 0 (0)
# OFFICIAL INFORMATION
245

Page 246

OFFICIAL INFORMATION#
OTHER BUDGETS
AE
Total Project Budget   Cumulative Expenditure to
date                 
Total Project
Forecast         
Projected Over/
(Under) Spend        
Total Revised
Budget 2025/26
Actual Expenditure
to 31st March 2026
Over/ (Under)
Spend for 25/26
£ £ £ £ £ £ £
FLEXIBILITY / IMPROVEMENT FUND 24,858,909 0 24,858,909 0 0 0 0
CORE INFRASTRUCTURE INVESTMENT 2,001,000 0 2,001,000 0 0 0 0
Total Other Budgets 26,859,909 0 26,859,909 0 0 0 0
2025/26 BUDGETS
CommentsProject Description
TOTAL PROJECT
# OFFICIAL INFORMATION
246

Page 247

OFFICIAL-PROTECT INFORMATION#
HRA Capital Statement 2526 Appendix 2
TOTAL PROJECT CURRENT YEAR 2025/26 - Period 12
Project Description Total Project
Budget           
Cumulative
Expenditure to
date
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2025/26
Actual Expenditure
to 31 March 2026
Virement
Request
Carry /Brought
Forward to
/From Future
Years
True Over/
(Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
EXPENDITURE
Council House Building
Afton Court 1,335,654 1,249,279 1,249,898 (85,756) Complete Complete Complete.
Flatt Road 20,178,000 19,706,151 19,709,046 (468,954) 0 0 Complete Complete Complete
Friars Lawn 2,199,628 2,085,562 2,085,598 (114,030) 0 0 Complete Complete Complete
Garrier Court 2,335,551 2,414,910 2,348,027 12,476 0 0 Complete Complete Complete
Harbourside 14,622,742 14,334,446 14,622,742 0 152,530 500 (152,030) Complete Complete Complete - carry forward required due to reimbursement of funds to the general fund
and Scottish Government for abnormal works that cost less than projected.
James McFarlane Site 4,784,118 1,042,008 4,784,118 0 271,868 207,279 (64,589) Complete Complete Complete - project still under DLP, carry forward required to cover any additional works
which may be required during this period.
Laburnum Ave/Newhouse Dr (Regen 1a&b) 3,274,506 1,390,770 2,953,449 (321,057) 257,091 149,058 (108,033) Complete Complete Complete - not financially complete due to contractor going in to administration.
Largs Police Station 2,769,301 2,749,762 2,769,301 0 1,258 1,618 360 Complete Complete Complete
Stanecastle Site 7,854,314 1,410,323 7,854,314 0 353,849 306,142 (47,707) Complete Complete Complete - project still under DLP, carry forward required to cover any additional works
which may be required during this period.
St Beya Gardens 3,691,052 3,689,345 3,691,052 0 0 0 0 Complete Complete Complete 
St Michael's Wynd 13,996,769 14,097,411 14,087,664 90,895 0 0 0 Complete Complete Complete
Ukraine Buy Backs 0 0 0 0 Complete Complete Complete
St Mary's Primary, Largs 6,528,399 6,553,916 25,517 474,703 47,564 (427,139) Complete Complete Complete
Towerlands Primary School 8,579,943 8,574,482 8,579,943 0 0 0 Complete
Ayrshire Central Site 49,841,415 18,469,660 49,841,415 0 15,570,238 15,281,909 (288,329) On Target On Target Work continues to progress on site and is currently expected to complete during winter
2027. In year slippage due to additional services required which weren't picked up during
the initial surveys and the delay in the de-watering of the site due to the weather.
Bourtreehill Village 10,037,524 310,067 10,037,524 0 128,176 122,999 (5,177) On Target On Target Demolition of Crofthead Court complete. Professional fees only to be incurred during
2025/26.
Fullarton Street (High Flats) 13,302,808 114,693 13,302,808 0 70,000 81,363 11,363 On Target On Target Projected spend during 2025/26 is for statutory consents & consultancy fees only.
Garnock Academy Site 12,092,889 5,835,046 12,092,889 0 5,293,737 5,150,334 (143,403) On Target On Target Work continues to progress on site and Ashleigh (Scotland) Limited hope to complete
works by late summer 2026, amended from spring 2026 due to utilities delays. First
handovers took place April 2026.
Kings Arms (113-115 High Street) 2,982,159 1,515,293 2,982,159 0 1,438,438 1,181,152 (257,286) On Target Significantly off target McLaughlin Construction have submitted an updated programme and now expect to
complete the Irvine town centre project during spring 2026. Contractor delays has
caused in-year slippage.
Montgomerie Park (Both Phases) 49,739,946 5,200,514 49,739,946 0 250,000 143,284 (106,716) On Target Slightly off target  Infrastructure works delay due to phasing of works alongside adjacent sites. Final plan
consultation event took placee in August 2025.
St Michaels Phase 3 13,996,769 0 13,996,769 0 0 0
Nelson Street Regeneration 1,079,858 3,726 1,079,858 0 5,000 3,726 (1,274) On Target On Target Tender application with Scottish Government for review/ approval.
Acquisition Houses-Open Market 1,273,080 327,269 1,273,080 0 654,177 327,269 (326,908) On Target On Target
Harbour Street 0 0 0 0 0 0 0 On Target On Target Project removed from the SHIP 2025-2030 as at 3 December 2024.
Grange Court, Stevenston 1,532,642 20,882 1,532,642 25,000 20,882 (4,118) On Target On Target Demolition of existing flats currently out to tender.
Future Years Projects 0 0 0 0
Nursery Place 1,775,219 0 1,775,219 25,000 0 (25,000) Final plans consultation event to be scheduled.
Corsehillhead (Shadow Programme) 2,032,906 0 2,032,906 0 0 0 0 On Target On Target Project in SHIP 2026-2031 Shadow Programme
James Reid Site (Shadow Programme) 11,820,675 17,026 11,820,675 0 501 17,026 16,525 Significantly off
target
Significantly off target Project in SHIP 2026-2031 Shadow Programme
Internal Management Charges 1,489,046 1 1,489,046 0 (10,070) 1 10,070 On Target On Target
Regeneration Project 1e Consultants Fees 25,649 0 25,649 25,649
Contingency 4,012,524 0 2,988,321 3,305,562 0 (18,674) (3,286,888)
House Building - General 3,210 0 3,210 3,210
0 0 0
0 0 0
0 0 0
SUB TOTAL 269,159,437 104,584,275 267,274,325 (860,908) 28,267,058 23,070,967 (5,394) (4,763,920) (426,778)
DELIVERY STATUS
# OFFICIAL-PROTECT INFORMATION
247

Page 248

OFFICIAL-PROTECT INFORMATION#
TOTAL PROJECT CURRENT YEAR 2025/26 - Period 12
Project Description Total Project
Budget           
Cumulative
Expenditure to
date
Total Project
Forecast                 
Projected Over/
(Under) Spend               
Total Revised
Budget 2025/26
Actual Expenditure
to 31 March 2026
Virement
Request
Carry /Brought
Forward to
/From Future
Years
True Over/
(Under)
Spend
Delivery Status
Financial Delivery Status Physical Narrative
DELIVERY STATUS
Improvements to existing stock
Wet Room - Void 382,334 275,487 275,487 (106,847) 382,334 275,487 (106,847) On Target On Target lower projected unit nos than budgeted
Bathrooms - Void 488,879 399,940 399,940 (88,939) 488,879 399,940 (88,939) On Target On Target lower projected unit nos than budgeted
Wet Room - Planned 119,644 165,880 165,880 46,236 119,644 165,880 40,879 5,357 On Target On Target
Bathrooms - Planned 195,545 154,666 154,666 (40,879) 195,545 154,666 (40,879) On Target On Target
Secondary bathrooms planned 8,542 0 0 (8,542) 8,542 0 (8,542)
Electrical Rewiring 920,438 1,002,099 1,002,099 81,661 920,438 1,002,099 81,661 On Target On Target Overspend includes anticipated additional voids
Heating 1,909,516 1,937,082 1,937,082 27,566 1,909,516 1,937,082 27,566 On Target On Target Increase in both heating systems and voids
Kitchens 1,815,386 1,846,915 1,846,915 31,529 1,815,386 1,846,915 31,529 On Target On Target
Kitchens - Void 1,106,741 1,091,231 1,091,231 (15,510) 1,106,741 1,091,231 (15,510) On Target On Target Reduction in anticipated voids
Roofing 781,956 637,975 637,975 (143,981) 781,956 637,975 (143,981) On Target On Target Carry forward due to adverse weather
Wallfloor rendering 1,107,217 936,231 936,231 (170,986) 1,107,217 936,231 (170,986) On Target On Target Carry forward due to adverse weather
EWI 339,435 174,919 174,919 (164,516) 339,435 174,919 (164,516) On Target On Target Carry forward due to adverse weather
Window Replacement 420,795 350,925 350,925 (69,870) 420,795 350,925 (38,371) (31,499) On Target On Target underspend due to lower average cost. Cf for potential future year 2627
Saltcoats MSF Investment 222,079 35,258 35,258 (186,821) 222,079 35,258 (186,821) On Target On Target
Smoke Detector Programme 523,551 442,141 442,141 (81,410) 523,551 442,141 (81,410) On Target On Target
Energy Efficiency 10,000 5,229 5,229 (4,771) 10,000 5,229 (4,771) On Target On Target may be a future carry forward beyond 2627. Still awaiting updated guidance from
Scottish Govt re SHNZS
Path Finder Project 25,000 0 0 (25,000) 25,000 0 (25,000) Significantly off
target
Significantly off target Difficulty in gaining access to properties to allow the work to be carried out. PMI are to
identify new addresses.
Solar Panels 2,813,735 2,391,293 2,391,293 (422,442) 2,813,735 2,391,293 (422,442) On Target On Target Carry forward due to adverse weather
HRA Slippage (1,945,479) 0 0 1,945,479 (1,945,479) 0 1,945,479
SUB TOTAL 13,190,793 11,847,271 11,847,271 (1,343,522) 11,245,314 11,847,271 0 735,525 (133,569)
Other Capital works
Estate Based Regeneration 1,481,785 1,171,906 1,171,906 (309,879) 1,481,785 1,171,906 (309,879) On Target On Target Underspend across various projects to be carried forward
Lift Replacement 612,513 519,543 519,543 (92,970) 612,513 519,543 (92,970) On Target On Target
Sheltered Housing Units 351,516 301,750 301,750 (49,766) 351,516 301,750 (49,766) Slightly off
target 
On Target Final account agreed for Barnett court. Underspend to be added to overall SHU budget
High Flats Demolition 0 0 0 0 0 0 0 On Target On Target
Other Capital Works 0 5,394 5,394 5,394 0 5,394 5,394
SUB TOTAL 2,445,814 1,993,200 1,993,200 (452,614) 2,445,814 1,998,594 5,394 (452,614) 0
Total Expenditure 271,605,251 106,577,475 269,267,525 (1,313,522) 41,958,186 36,916,831 0 (4,481,009) (560,347)
Income
Affordable Housing Contributn (721,008) (449,200) 271,808
CFCR (8,348,729) (8,348,729)
Capital Grants (10,104,000) (14,372,671) (4,268,671)
Prudential Borrowing (21,971,251) (12,789,841) 8,621,064 560,347 Reduced borrowing required to reflect rephasing and projected underspends
Use of Reserves (721,620) (721,620)
Sale of Assets (11,684) (15,599) (3,915) Capital receipts.
Other Capital Income (79,894) (219,171) (139,277)
SUB TOTAL (41,958,186) (36,916,831) 0 4,481,009 560,347
Total Project Expenditure 271,605,251 106,577,475 269,267,525 (1,313,522) 41,958,186 36,916,831 0 (4,481,009) (560,347)
Total Project Income (41,958,186) (36,916,831) 0 4,481,009 560,347
# OFFICIAL-PROTECT INFORMATION
248

Page 249

OFFICIAL-PROTECT INFORMATION#
# OFFICIAL-PROTECT INFORMATION
249

Page 250

OFFICIAL-PROTECT INFORMATION#
# OFFICIAL-PROTECT INFORMATION
250

Page 251

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Community Asset Transfer – Blacklands Hall, Kilwinning 
Purpose:  To seek approval for the transfer of ownership of Blacklands
Hall (and adjacent land), Abbots Avenue, Kilwinning, KA13 6BZ
to the Kilwinning Community Shed. 
Recommendation:  That Cabinet:   
a) Agrees to the asset transfer of Blacklands Hall and the
adjacent land from North Ayrshire Council to the Kilwinning
Community Shed;
b) Approves the recommended terms of transfer on this
occasion at 5% of the property valuation of £85,000 (totalling
£4,250); and 
c) Authorises officers to conclude the associated legal and
community asset transfer processes for Blacklands Hall and
adjacent land. 
1. Executive Summary 
1.1 The report proposes the Community Asset Transfer (CAT) of Blacklands Hall (and
adjacent land), Abbots Avenue, Kilwinning from North Ayrshire Council to the Kilwinning
Community Shed SCIO (the Shed). 
1.2 The transfer of the asset will provide a sustainable base for local community activity,
focusing on the group’s key priorities and providing a space for the community to come
together, create and support each other. The proposed uses include a range of events
and activities which contribute to the Shed’s key objectives. 
1.3 This report recommends that Cabinet agrees to the transfer of Blacklands Hall and
adjacent land at 5% of the valuation costs of £85,000 (totaling £4,250). This reflects the
condition of the facility, savings made against future upkeep and the potential social
return on investment. The report also recommends that officers are authorised to
conclude the process under these terms. 
2. Background 
Agenda Item 12
251

Page 252

2.1 North Ayrshire Council wishes to support its communities to make the best use of land
and assets which are available as part of our Community Wealth Building ambitions.
Under the terms of the Community Empowerment (Scotland) Act 2015, community
asset transfer (CAT) provides an opportunity for people to be involved in developing
and providing opportunities or services for their local communities to acquire public
assets. It may also allow groups to develop commercial ventures which will support
community benefit. Asset transfer may also mean that public assets get used more
frequently and more effectively. Furthermore, community-led ownership may allow
additional opportunities for groups to secure additional funding or resources. 
2.2 Blacklands Hall sits in the heart of the Kilwinning community. The asset was originally
a sports facility with changing and office facilities. It was previously leased to a local
football club who have recently vacated the premises making it available for a CAT.
The proposed transfer will provide a sustainable base for the local Community Shed.
The transfer includes a small, grassed area adjacent to the hall which will allow the
group to meet the growing demand from members for gardening and growing
activities. and gives future capacity to contribute to the Local Community Food
Network. Appendix 1 identifies both the hall and the grassed area proposed for
transfer. 
2.3 The benefits of Community Sheds are well evidenced and the Shed group is keen to
deliver these to the local community of Kilwinning. Proposed uses include a range of
events and activities which contribute to their key objectives. This includes: 
• Creating, developing and maintaining a facility, namely a Community Shed that will
benefit the community
• Offering members opportunities to meet and undertake creative, physical,
purposeful and recreational activities of their choice
• Reducing the isolation of members, contributing to their physical and mental
wellbeing, and fostering community spirit
• Developing the capacity of the members to share their skills and knowledge with
others 
2.4 Kilwinning Community Shed was set up in May 2024 and has so far grown to 44
members. Having their own facility will allow the Shed to further develop in a variety of
ways to better serve the community and meet the needs of the members. They are
keen to work alongside local community groups helping to enhance the local area and
well as supporting local schools with learning opportunities and developing learning
and play spaces. 
2.5 The group currently use various venues in the town for different activities. Acquiring
the asset will allow them to come together under one roof and consolidate the different
elements, creating a better sense of belonging and improving social cohesion. The
group aspire to expand and deliver gardening, woodworking, arts and crafts, model
making, computing skills, cookery, 3D printing and a model railway with a community
cafe a potential development for the future. 
2.6 The Shed have been operating and caring for another asset in the town and have
proven their ability in this regard. They upgraded that building to meet their needs and
have reaped the benefits of having their own facility, however have been unable to
remain there due to the building being used for other purposes by its owner. The CAT
252

Page 253

of Blacklands Hall will allow them to stabilise and further grow their offering to the local
community. 
2.7 Having ownership, enhancing the assets and increasing the range of events and
activities within an improved facility will encourage a wider range of people to get
involved. Participants will benefit from being more active and engaged in community
led activity. This will support several strategic and policy areas relating to physical
activity, positive mental health and wellbeing.  Opportunities for local volunteering will
increase, stimulating involvement in shaping and regenerating community life, building
self-esteem and confidence. The activities delivered by the Shed support the
advancement of all four of Kilwinning’s Locality Planning priorities: 
• Supporting Skills and Work
• Improving our Local Environment
• Alleviating Poverty and Promoting Equality of Access to Opportunities
• Improving Community Wellbeing 
2.8 The ownership will have wider community benefit as the care and maintenance of the
asset will be carried out by the Shed members supported by local businesses as and
when required, contributing to the local economy and supporting the principles of
Community Wealth Building. 
2.9 The request includes the hall and the small grass area adjacent to the hall (as note on
Appendix 1).  The car park is currently shared with the local bowling club. The Shed is
keen to work with the bowling club to continue that relationship, as well as develop a
closer partnership with them and support them wherever possible. 
2.10 The statutory community consultation required for a Community Asset Transfer has
taken place with no objections received. 
3. Proposals 
3.1 That Cabinet: 
1. Agrees to the asset transfer of Blacklands Hall and adjacent land from North Ayrshire
Council to Kilwinning Community Shed;
2. Approves the recommended terms of transfer on this occasion at 5% of the property
valuation of £85,000 (totalling £4,250); and
3. Authorises officers to conclude the associated legal and community asset transfer
processes for Blacklands Hall and adjacent land. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Through the transfer of the assets, the Council will achieve an overall capital receipt of
£4,250 and be relieved of ongoing care and maintenance costs. 
Human Resources 
253

Page 254

4.2 None. 
Legal 
4.3 The Local Government (Scotland) Act 1973 places a statutory obligation on the Council
to obtain the best price or the best rent when it disposes of any asset by sale or lease. 
These regulations permit a disposal at less than the best price achievable where either
(a) the property is valued at less than £10,000, or (b) the Council has compared the
financial cost of transfer against the community benefits and determined that the
transfer is reasonable and promotes either economic development or regeneration,
health, social well-being or environmental well-being. 
Equality/Socio-economic 
4.4 There will be considerable socio-economic benefits from the transfer which are detailed
within this paper, and the value proposed reflects the community benefits. 
Climate Change and Carbon 
4.5 The transfer seeks to provide sustainable community facilities through securing the
asset for a wide range of community-led activities. 
Key Priorities 
4.6 The proposals contained within the report support the following North Ayrshire Council
Plan priorities: 
• Wellbeing, by providing a space to support connection and social cohesion.
• Communities and Local Democracy, by allowing a community group to take control
of an asset.
• Climate Change, through the work of the group to improve environmental
sustainability and support the circular economy by repurposing materials. 
Community Wealth Building 
4.7 This proposal supports the following pillars of community wealth building: 
• Advancing community enterprises; 
• Advancing local ownership of underused land and buildings; and  
• Supporting local business activities and increasing the variety of ownership models. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
254

Page 255

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The consultation required in terms of the Community Empowerment (Scotland) Act 2015
for a community asset transfer application has now concluded. The outcome is outlined
in section 2.10. 
5.2 Within North Ayrshire Council, consultation has taken place with Streetscene,
Connected Communities, Finance, Estates, Property Maintenance and Investment, and
Legal Services. All parties are supportive of the proposal for the listed assets. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities, on 01294 324395. 
Background Papers
Appendix 1
255

Page 256

256

Page 257

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Community Asset Transfer – Auld Dirrans Resource
Centre, Kilwinning 
Purpose:  To seek approval for the transfer of ownership of Auld Dirrans
Resource Centre, 70 Dirrans Terrace, Kilwinning KA13 7PH to
Irvine Elite Boxing Club. 
Recommendation:  That Cabinet:   
a) Agrees to the asset transfer of Auld Dirrans Resource Centre
from North Ayrshire Council to Irvine Elite Boxing Club 
b) Approves the recommended terms of transfer on this
occasion at 5% of the property valuation of £85,000 (totalling
£4,250) and 
c) Authorises officers to conclude the associated legal and
community asset transfer processes for Auld Dirrans
Resource Centre. 
1. Executive Summary 
1.1 This report proposes the Community Asset Transfer (CAT) of Auld Dirrans 
Resource Centre, 70 Dirrans Terrace, Kilwinning KA13 7PH from North Ayrshire
Council to Irvine Elite Boxing Club (SCIO). 
1.2 The transfer of the asset will provide a sustainable base for local community activity
focusing on boxing and physical activity. The proposed uses include a range of events
and activities which contribute to the Club’s key objectives.   
1.3 It is recommended that Cabinet agrees to the transfer of Auld Dirrans Resource
Centre with a recommended associated fee of 5% of the valuation price of £85,000
(£4,250 in total) applied. This reflects the condition of the facility; savings made
against future upkeep, and the potential social return on investment. The report also
recommends that officers should be authorised to conclude the process under these
terms.   
2. Background 
2.1 North Ayrshire Council wants to support its communities to make the best of the land
and assets which are available as part of its Community Wealth Building ambitions.
Agenda Item 13
257

Page 258

Under the terms of the Community Empowerment (Scotland) Act 2015, Community
Asset Transfer (CAT) provides an opportunity for people to be involved in developing
and providing opportunities or services for their local communities. It may also allow
groups to develop commercial ventures, which will support community benefit. Asset
transfer may also mean that public assets get used more frequently and more
effectively. Furthermore, community-led ownership may allow additional opportunities
for groups to secure extra funding or resources. 
2.2 Auld Dirrans Resource Centre is located in the south east of Kilwinning and is 
easily accessible by car, public transport or by foot and bicycle (see site plan at
Appendix 1). The transfer will give the club a base to deliver their events and activities
from and will allow the club the expand its offering and in turn grow its members and
impact in the local community and beyond. 
2.3 The proposed uses include a range of events and activities which contribute to 
the group's key objective: “to advance public participation in boxing for people living in
North Ayrshire.” 
In order to achieve this the club delivers activities: 
• To teach children and adults the sport of boxing and uphold the rules of sport
• To encourage and promote health, fitness and wellbeing across the community
• To provide play and training facilities for the community
• To promote and maintain the highest standards of technical competences and
safety in boxing 
2.4 The group formed in 2016 and changed governance in December 2024 to become a
SCIO. The group have held a lease of an industrial unit in Irvine for the past six years.
They have done so successfully and demonstrated skills in the care and maintenance
of an asset. 
2.5 Leasing the unit has allowed the club to deliver valuable opportunities to its
Community; however, having ownership of a facility will allow them to further develop
in a variety of ways to better serve their community and meet local needs. The club is
committed to keeping membership fees low and offering free or subsided sessions for
families facing financial hardship.  Securing the asset will allow the club to expand its
offering to include a community gym running from 9.00am-9.00pm alongside its core
boxing and fitness classes. The club run a successful girls’ boxing classes which
opens the sport up to a demographic not usually associated with it. The club also
plans to offer free taster sessions and school holiday programmes and will work
closely with community link workers and social services to identify individuals and
families who would benefit most from participating in their programmes. 
2.6 The asset has been vacant for some time and will benefit from active use and
improvement. The group are keen to improve the facility whilst equipping the asset to
meet their specific needs. Having sole use of the space will allow them to permanently
install key pieces of equipment, saving setting up time and improving safety and
accessibility. The space offered by the asset will allow for events to take place on the
premises assisting in income generation. 
2.7 Boxing has had a strong presence in North Ayrshire for many years and the benefits
of involvement in the sport is impactful. The individual, personal testimonies of
258

Page 259

members clearly demonstrate the breadth the depth of the benefits that its members
experience by attending. These include – 
• Physical and Mental Health: Boxing is an excellent way to improve cardiovascular
health, build endurance, and increase muscular strength. It also helps with mental
health by reducing stress, improving focus, and boosting confidence. 
• Social Connections: Boxing clubs foster a sense of camaraderie and team spirit.
Members often form close-knit relationships, supporting each other through
training and other challenges. This creates a supportive network and a sense of
belonging.
• Youth Engagement and Mentorship: Boxing clubs often engage with at-risk youth,
providing them with a positive outlet and mentorship. This can offer diversionary
opportunities and can help steer them away from negative influences and towards
personal growth and development. 
• Inclusivity and Diversity: Boxing gyms are known for their inclusivity, welcoming
people from diverse backgrounds, ages, and skill levels. This diversity enriches
the experience and promotes mutual understanding and acceptance. 
2.8 Irvine Elite Boxing Club is fully affiliated with Boxing Scotland, the official governing
body responsible for the sport’s standards, regulations, and athlete development
across Scotland. Boxing Scotland is a member of World Boxing and the IABA and is
directly supported and endorsed by sportscotland. This ensures the club operates to
nationally regulated standards, including those for coach qualifications, safeguarding
procedures, medical protocols, and athlete progression pathways. Because of this
recognised affiliation, Irvine Elite Boxing is the only club in the local area authorised to
teach and participate in Olympic-style amateur boxing, including access to sanctioned
competitions, talent pathways, and national coaching structures. This distinction is 
important for ensuring athlete safety, proper development, and recognised competitive
opportunities. 
2.9 Having ownership, enhancing the asset and increasing the range of events and
activities within an improved facility will encourage a wider range of people to get
involved. This will support several strategic and policy areas relating to physical
activity as well as positive mental health and wellbeing.  Opportunities for local
volunteering will increase, stimulating involvement in shaping and regenerating
community life, building self-esteem and confidence. 
2.10 The ownership will have wider community benefit as the care and maintenance of the
asset will be carried out by local businesses, contributing to the local economy and
supporting the principles of Community Wealth Building. 
2.11 The statutory community consultation has taken place with no objections received. 
3. Proposals 
3.1 That Cabinet: 
a) Agrees to the asset transfer of Auld Dirrans Resource Centre from North Ayrshire
Council to Irvine Elite Boxing Club
b) Approves the recommended terms of transfer on this occasion at 5% of the
property valuation of £85,000  (totalling £4,250) and 
259

Page 260

c) Authorises officers to conclude the associated legal and community asset transfer
processes for Auld Dirrans Resource Centre. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Through the transfer of the assets, the Council will achieve a potential capital receipt
of £4,250 and be relieved of ongoing care and maintenance costs. 
Human Resources 
4.2 None. 
Legal 
4.3 The Local Government (Scotland) Act 1973 places a statutory obligation on the
Council to obtain the best price or the best rent when it disposes of any asset by sale
or lease.  These regulations permit a disposal at less than the best price achievable
where either (a) the property is valued at less than £10,000, or (b) the Council has
compared the financial cost of transfer against the community benefits and
determined that the transfer is reasonable and promotes either economic
development or regeneration, health, social well-being or environmental well-being. 
Equality/Socio-economic 
4.4 There will be considerable socio-economic benefits from the transfer and the value
proposed reflects the community benefits. 
Climate Change and Carbon 
4.5 The transfer seeks to provide sustainable community facilities through securing the
asset in Kilwinning for the key purposes of Irvine Elite Boxing as detailed in 2.3 above. 
Key Priorities 
4.6 The proposals contained within the report support the following North Ayrshire Council
Plan priorities: 
• Wellbeing – To transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people, through providing opportunities for people to come
together to support each other. 
• Communities and Local Democracy - We will have active inclusive and resilient
communities, through supporting networking and community ownership. 
In addition, the transfer supports the Kilwinning Locality Priorities - 
• Supporting Skills and Work
• Improving our Local Environment
• Alleviating Poverty and Promoting Equality of Access to Opportunities
• Improving Community Wellbeing
260

Page 261

Community Wealth Building 
4.7 This proposal supports the following pillars of community wealth building: 
• Advancing community enterprises; 
• Advancing local ownership of underused land and buildings; and  
• Supporting local business activities and increasing the variety of ownership
models. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 The request supports the rights of children and young people through offering better
access to facilities, in particular supporting the article 12 right to be heard as young
people have been instrumental in the success of the facility and the impact of the
services provided ensured the success of the application. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The consultation required in terms of the Community Empowerment (Scotland) Act
2015 for a community asset transfer application has now concluded.  The outcome is
outlined in section 2.11 above. 
5.2 Consultation has taken place with, Streetscene, Finance, Estates, Connected
Communities, Property Maintenance and Investment the Business Team and Legal
Services. All parties are supportive of the proposal for the asset. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324395. 
Background Papers
Appendix 1 - Plan
261

Page 262

262

Page 263

PUBLIC INFORMATION
PUBLIC INFORMATION   
NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet (Education) 
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the application from Garnock Valley
Locality Partnership in line with CIF criteria; and
b) Approves the CIF application in relation to
Dalry Community Sports Club (see Appendix
1). 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for
the creation of an innovative fund to enable communities to address the priorities
they have identified through Local Planning Partnerships and within the context
of North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. In June 2021, Cabinet approved
a further £1m top-up for the funding, with a further £2m added in November
2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action
plans and refining proposals for expenditure in line with their locally identified
needs. It is a testament to the dedication of the Locality Partnerships and their
community partners that proposals continue to emerge to provide creative
approaches to addressing local challenges. 
1.3 This report brings forward proposals which respond to the specific needs of the
local community, and which have been developed based on local circumstances
and opportunities.
2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for
the creation of an innovative fund to enable communities to address the priorities
they have identified through Locality Planning Partnerships and within the context
of North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. A further £3m was added to the
funding in 2021. A summary of the current position on disbursement of CIF
monies is summarised in the table below:
Agenda Item 14
263

Page 264

PUBLIC INFORMATION
PUBLIC INFORMATION 
2.2 It was agreed that the CIF awards would range between £5,000 and
£100,000 for community organisations, as defined in the CIF guidance, in
order to support proposals and projects that connect with: 
• The North Ayrshire Local Outcomes Improvement Plan overarching aim
of North Ayrshire: Fair for All, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Sustainable North Ayrshire
Strategies 
And will also: 
• Fulfil a compelling need and not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number
of people possible;
• Exhibit project and/or organisational innovation in their approaches to their
work in their way of addressing community challenges and in their request
to Locality Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide
financial statements upon requests) and efficiently and effectively
managed. This can include an organisation to be created to deliver
the project;
• Include options or potential for NAC and CPP employee
engagement and volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a
regular basis. 
2.3  The proposal development and application process has been agreed as
follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
Locality Value of
CIF from
first funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total balance
available
Irvine £754,000 £1,146,010 £290,000 £580,000 £477,990
Kilwinning £286,000 £438,060 £120,000 £240,000 £207,940
Three
Towns
£598,000 £1,318,000  £240,000 £480,000 £0
Garnock
Valley
£390,000 £601,103.04 £150,000 £300,000 £238,896.96
North Coast £468,000 £935,761 £170,000 £340,000 £42,239
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £4,564,013.04 £1,000,000 £2,000,000 £1,035,986.96
264

Page 265

PUBLIC INFORMATION
PUBLIC INFORMATION
access the applications, make links, and look at the funding ‘in the round’.
• If the partnership supports a bid, then the group will be encouraged to submit
a full application form, which they will decide upon before making a proposal
to Cabinet for final approval.
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed application at appendix 1 has been developed by community
partners and North Ayrshire Council officers and are now recommended for
approval by Cabinet. The application is summarised below. 
2.5 The Garnock Valley Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Garnock Valley Locality Partnership CIF allocation
to date: 
£840, 000
Garnock Valley Mens Shed - Project Initiation £28,000 
Travel Needs Analysis   £25,000 
Geilsland Hall - Volunteering and Employability   £45,000 
Garnock Valley 20:20 Vision  £15,000 
Beith Community Development Trust - YOUth Lead  £43,500 
Garnock Valley Mens Shed - Heating System Replacement   £20,000 
Café Solace - Development Worker   £49,723 
Geilsland Courtyard Feasibility Study   £15,582 
Beith Playpark   £100,000 
Beith Community Association  £22,098.04
Garnock Valley 2023 Development Worker  £51,200
Beith Hive  £41,000
Radio City Association  £65,000 
Beith Trust - 3G £80,000
Balance  £238,896.96 
2.6 Proposal: Dalry Community Sports Club (£100,000) (See Appendix 1)
2.6.1  Dalry Community Sports Club, established in 2007 and incorporated as a SCIO in
2014, was originally focused on increasing participation in sport and leisure through
supporting existing local activities and developing new opportunities. Over the past
seven years, the organisation has broadened its remit to address wider community
challenges, particularly social isolation and food insecurity. This shift included the
introduction of free food provision within activities and events, for example Park
Lives. In response to rising need and in alignment with North Ayrshire Council
priorities, the organisation established a Community Larder in November 2020,
alongside a Warm Space initiative. The group is also progressing a Community Asset
Transfer of Dalry Public Park pavilion.
2.6.2 In addition, the organisation seeks to create training and employment opportunities,
support skills development, and strengthen community cohesion through partnership
working, engagement and the promotion of civic pride. Overall, its work contributes
265

Page 266

PUBLIC INFORMATION
PUBLIC INFORMATION
to building a more inclusive, resilient and connected community in the Garnock
Valley.
2.6.3 The group is seeking funding to support the development of community allotments
and associated infrastructure on land adjacent to Dalry Public Park. This includes the
creation of raised growing beds and plots, establishment of a shared community
growing space, and the development of an educational area to support learning and
skills development. Funding will also contribute to essential site works and
equipment, enabling accessible, sustainable use of the space, as well as supporting
the creation of additional playing fields and activity areas to enhance opportunities
for sport, recreation and community engagement. The group will ensure that all
consents and approvals required are in place prior to work commencing, including
agreement of a change of use for the land if required. From a land use planning
perspective, use of land for community or health purposes is likely to be supported in
principle subject to detailed assessment in a planning application if it is confirmed to
be required.
2.6.4. The proposal aligns with Garnock Valley Locality Partnership priorities by supporting
‘Work and Local Economy’ through skills and employability opportunities, ‘enhancing
Facilities and Amenities’ via community growing space and recreational provision,
and supporting ‘Moving Around’ by increasing access to inclusive local spaces.
Additionally, there are close links to both the recently prepared Our Garnock Valley
Local Place Plan and the North Ayrshire LOIP by enhancing community facilities,
promoting health and wellbeing, creating skills and employability opportunities, and
strengthening community connections while addressing inequality and social
isolation. In addition, the project will align with the development of North Ayrshire
Council’s Good Food Plan and become part of the food system and local growing
network.
2.6.5 Match funding of £58,000 has been secured to support the project. Dalry Community
Sports Club has 19 years’ experience of operating as a community organisation and
registered charity, with established governance and financial management
arrangements, including the preparation of annual audited accounts and multi-year
financial projections as part of its Community Asset Transfer activity. Provision has
also been made for the longer-term sustainability of the project through the
introduction of modest membership fees, ongoing fundraising activity, and the pursuit
of additional external funding opportunities. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the application from Garnock Valley Locality Partnership in line
with CIF criteria; and
b) Approves the CIF application in relation to Dalry Community Sports
Club (see Appendix 1). 
4. Implications/Socio-economic Duty 
Financial 
266

Page 267

PUBLIC INFORMATION
PUBLIC INFORMATION
4.1 CIF funding is allocated from within existing resources. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment.  Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with climate change and carbon reduction
opportunities are considered in relation to each CIF application.  This proposal
supports recycle and re-use principles. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims. 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• We will have active, inclusive, and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building: 
• Financial Power: Listening to communities and local enterprises to maximise the
impact of financial investment and grow local business, enhance innovation and
empower communities.
• Land and Assets: Maximising the function and ownership of local physical assets for
the benefit of communities and enterprises. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 The proposals support the rights of children and young people through offering better
access to facilities, in particular supporting the right to play and the right to be part of
their community.
267

Page 268

PUBLIC INFORMATION
PUBLIC INFORMATION 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The proposals contained within this report have been developed by the Locality
Partnerships, through consultation with local people, including young people. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1: CIF Application Dalry Community Sports Club 
268

Page 269

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
The CIF will support proposals and projects that:
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis.
When to apply and how?
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’.
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval.
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible:
Christina Pieraccini
Locality Officer - Garnock Valley
Connected Communities
North Ayrshire Council
Walker Hall
45, Main Street
Kilbirnie
KA25 7BX
Tel: 01505 680203
Mob: 07966 160854
Email: cpieraccini@north-ayrshire.gov.uk
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf
269

Page 270

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
1. Details of your organisation
Name of Organisation 
Dalry Community Sports Club
Postal Address for Correspondence
Name of Contact Person Allan McGinlay
Position in Organisation Chairperson
Telephone Number
Email Address
Total amount of funding requested: £100,000
Match funding (if any): £58,000  ( confirmed )
2. Brief description of your organisation
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence.
Dalry Community Sports Club was formed in 2007, and became a SCIO in 2014,
where our early years helped to encourage participation in various sports and leisure
activities. This was achieved primarily through supporting individuals and groups with
their existing activities, and with new initiatives driven by ourselves. The last 7 years
has seen us looking at opportunities to help address both the social isolation and
food deprivation issues that exist within the community. Initially, we did this through
offering free food through our activities, like Handball, which quickly progressed to
free activities and food at our Park Lives events, both at Dalry Public Park during the
summer period, and at Dalry Primary School over the winter. The COVID pandemic
saw this need accelerate greatly, and for the need for us to align with North Ayrshire
270

Page 271

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Councils priorities, where we formed our Community Larder in November 2020,
which was thereafter complimented by our Warm Space initiative. 
Purposes
“The organisation has been formed to benefit the community of Dalry, 
recognised as being those living within the KA24 postcode area (“the
Community”) with the following objectives: 
3.1        To advance public participation in sport in Dalry and the surrounding
area by promoting and providing opportunities for a wide range of sporting
and leisure activities in an accessible manner to all groups of people and to
improve the fitness and health of the persons for whom the activities are
intended. 
3.2        The promotion for the benefit of the public of urban or rural regeneration
in areas of social and economic deprivation in Dalry and in the surrounding area
by all or any of the following means:
(a) The prevention of poverty and the relief of financial hardship by using
DIGNITY principles to provide food security to those who need it most and are
being disadvantaged due to unemployment, low income, lone parent, health,
and social standing. 
(b) Advancement of environmental protection by reducing food waste and
encouraging sustainable development. 
(c) Advancement of physical and mental health and wellbeing by improving
health outcomes, improving emotional wellbeing and promoting social inclusion
through acting as a community focal point, and by promoting access to key
support such as money advice, credit unions, housing, health, employment and
skills. 
(d) The creation of training and employment opportunities through the provision
of facilities, buildings, and/or land for use on favourable terms and for the
advancement of education, training or retraining, particularly among
unemployed people, and  those who by reason of their youth, age, infirmity or
disablement, financial hardship or social and economic circumstances, have
need of such facilities:
271

Page 272

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
(e) Bringing the community together through engagement, partnership,
collaboration and co-operation and by fostering community spirit and
encouraging civic pride.
(f) Promote the health and wellbeing of the residents of the area and to work
together as residents irrespective of age, sex, ethnicity, ability, religion or
political view.
272

Page 273

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
3. Title and summary of proposal
Tell us about your idea. Please describe in as much detail as possible, what the
funding will be used for. 
Please include:
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved.
Dalry Community Allotments & Playing Fields
Community Allotments / Playing Field – We have recently entered into an agreement
with DSM to lease a large field adjacent to the public park for a community allotment
space, additional playing fields and possibly a community orchard. We see the
introduction of our Community Allotments project as a continuation of our journey, in
looking for opportunities that will help address some of the issues within our
community, including, social isolation, food deprivation, mental health & wellbeing,
and in so doing so help towards building a stronger sense of community in which
people want to be involved. Our community allotments with comprise of 3 areas –
1. Plots / beds for lease of various sizes to attract an income to support the
running costs. Phase 1 has the potential of 120 raised beds and can be divided into
a number of plots, to be determined by the expressions of interest we receive.
Initially this will be through Open Days, Social Media, and local advertising as
appropriate. GV Allotments have offered their support here, where they have
experience of multi-plot sizes, and is reflective of the bandwidth of experience across
their plot owners.
2. Community area, where people will be able to come together, free of charge
and utilise the area to both grow, and give away free, vegetables, and also provide a
safe space that allows social interaction.
3. Educational space – provide the opportunity to invite, schools, kids, people
who are interested in growing vegetables, and share knowledge / skills of the various
aspects of growing your own vegetables. In this space we would also look to include
North Ayrshire Council’s Community Learning and Development  ( CLD ) Team, who
we already have a relationship with through some of our other activities, and would
look to continue to build on this.
These 3 areas will help us maximise the opportunity to reach across our community
and attract people into all areas of the allotments, and therefore we would look for
273

Page 274

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
the participation rate to be healthy. If there was looking to be a potential shortfall in
uptake, then we would look to open up the opportunity for people outwith the KA24
postcode area. On discussion with other allotments, this is a common theme,
especially initially until people find something more local to them.
The Government have produced a 25 Year Environment Plan, acknowledging that
connecting people to their environment will also improve their health and well-being.
Various studies have shown that every 10 per cent increase in exposure to green
space translates into an improvement in health equivalent to being five years
younger.
The many benefits associated with allotments include :
1. Growing food can work towards a healthier, wealthier and more environmentally
sustainable community, with low-cost healthy fresh fruit and vegetables.
2. Bringing people together, and providing the opportunity for social engagement,
and some physical exercise, helping to improve loneliness and social isolation.
3. The opportunity for people to share their skills and knowledge and for the
community to realise that benefit where people now want to get involved.
4. There`s a growing awareness of the role that gardening plays in both preventing
and alleviating mental ill-health. Many allotment gardeners tell us that nurturing
plants and contemplating nature makes them feel calmer and more hopeful.
5. Gardening can also help to maintain good gait and balance in older people and
helps with cognitive decline.
6. Time outdoors in the sun can also help build up your vitamin D levels
7. An allotment can produce enough food to supplement a family’s weekly shop
8. Allotment can be all year round, where the allotment holders experience the
seasons, witness the behaviour of birds, insects and other animals and gain an
understanding of the eco-system. This appreciation of the natural world also has the
potential to inspire more environmentally aware behaviour by themselves and their
children.
Playing Field – DCSC are in the final stages of the CAT process in relation to the
sports pavilion in Dalry Public Park. As part of our lease agreement with DSM, this
will see us create a number of football pitches / sports / activity areas which will be
supported by the sports pavilion, which we have already renovated to include, both
changing and welfare facilities. We recognise the positive benefits that various
outdoor activities can have on people’s physical health and wellbeing, and the
importance to provide multiple opportunities across a variety of activities to help
realise this.
Partners to Date
1. Colin Bratt, DSM Director Finance and Business Support
274

Page 275

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
2. Graeme Harrison, DSM Solicitor, Morton Fraser MacRoberts LLP
3. Eric McMillan, McMillan and Cronin Architects
4. Ian Briggs, J & J McCosh Solicitors, DCSC Solicitor
5. Antony Hume, North Ayrshire Planning
6. Christina Pieraccini, Locality Officer, North Ayrshire Council
7. Heather McVie Branley, Community Development Worker, North Ayrshire
Council
8. Roy Banks, Highland Forestry Services Ltd
9. Robet Miller, R&L Miller Ltd
10. Garnock Valley Allotments
11. Dalry Community Larder
12. Dalry Thistle Football Academy
13. Garnock Rugby Club
Future Partners & Potential
1. Dalry Primary School
2. St Paladius Primary School
3. Dalry Community Garden
4. Dalry Action Group
5. Dalry Community Association
6. CEIS Ayrshire Skills and Training
275

Page 276

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
7. What difference will this project make within the locality and to local
services and programmes?
Please include:
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Moving
Around (Public Transport, Traffic and Parking) 2. Work and Local Community
3. Facilities and Amenities
Click or tap here to enter text.
Dalry Community Sports Club, along with Partner Groups, has recently been
recognised by the Provost and all Elected Members of the Garnock Valley for their
contribution in the preparation and completion of the Garnock Valley Place Plan,
which clearly sets out the aspirations for the Garnock Valley Locality through the
collective working of community groups, the third sector businesses, local and
national governments, to enhance the sense of place and improve its economy.
We see our Community Allotment / Playing Field Project as clearly aligning with the
aspirations within the plan, specifically chapters 8 & 13 ( pages 47-49 ), and in
particular where we need to enhance the sense of Community life, and maximise the
benefits that are associated with better utilisation of our Parks and Outdoor Spaces.
Improvements to Parks and Outdoor Spaces, was 1 of the 8 Calls to Action that were
agreed by the Locality Partnership.
These additional facilities / amenities would help provide opportunities for people to
come together, with a range of benefits, including, socialisation, mental health &
wellbeing, exercise, education, sharing skills & knowledge and learning
opportunities, overall enhancing the opportunity for Community Wealth Building. Our
proposal helps to meet the 5 pillars of community wealth building in terms of : Piller 1
- progressive procurement - using local businesses for the works. Pillar 3 - Use of
Land and assets - maximising land use, and Piller 5 - Diverse ownership.
Dalry Public Park is at the Heart of our community, where we see our Project with its
extension into the DSM field, as an excellent opportunity to bring back some of those
benefits enjoyed by previous generations, who had both a more outdoor lifestyle and
enhanced sense of community – ultimately, a more active community with better
health and wellbeing outcomes, more social inclusion and a greater community
pride.
276

Page 277

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
We are looking to utilise a portion of the products grown to also support our
Community Larder, where it has become more difficult to source volumes of products
from local Food Retailers in relation to “best before” and “use by” dates, with
Retailers utilising their own initiatives to sells these with store.
Allotments can have a surprisingly deep impact on a community, especially when
designed with inclusion and participation in mind.
Reducing inequality
One of the biggest differences community allotments make is improving access to
fresh, affordable food. The Garnock Valley, which includes Dalry is in an area with
above average levels of deprivation and where people may struggle with the cost of
living or lack access to healthy produce.  Allotments give residents the opportunity to
grow their own fruit and vegetables which reduces food expenses and can help
address “food deserts,” where supermarkets or fresh options are limited.
Allotments also help create a more equal playing field socially. It is planned to
allocate plots at low cost (or free), meaning people from different income levels can
participate. From our relationship with GV Allotments, we know that they charge £30
per year for a plot and £12 for a single raised bed outwith that plot. We would look
for our costs to reflect this, and together with our free Community Beds area, cover
the needs of our participants. Beyond food, community allotments offer access to
green space—something that is often unevenly distributed, with lower-income
communities generally having less access to safe, well-maintained outdoor areas.
Dalry is one of only three towns in North Ayrshire to fall below the Fields in Trust
(FIT) standard for open spaces and the development of the allotments and playing
fields will help create additional outdoor space for community use.
Supporting volunteering and community engagement
Allotments naturally encourage volunteering because they rely on shared effort.
Residents may volunteer to maintain communal areas, organize planting schedules,
run workshops, or support new gardeners. This creates opportunities for people of all
ages and backgrounds to contribute meaningfully to their community.  DCSC have
been in contact with Dalry Primary School who are keen to involve some of the older
pupils in the project works. 
Volunteering in this context is also highly accessible—no formal qualifications are
needed, and people can contribute as much or as little time as they’re able. This can
be particularly valuable for retirees, young people, or those seeking to build
confidence, skills, or social connections. Over time, it strengthens community bonds
and fosters a sense of ownership and pride in the local area. GV Allotments have
277

Page 278

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
been very generous is sharing the learning and experience that they have gain since
creating their own allotments, and are keen to extend this, into all aspects of what we
need to do to realise our own project, and in particular around the initial phases
required to get us started, including, recruitment for plots & plot sizes, membership
criteria, rules / code of conduct / practice, water entrapment ideas, solar power for
re-chargable equipment, and volunteer commitments for community spaces and
general running criteria.  
We would expect the project to run initially with volunteers, however as it grows and
develops, then there may be recruitment opportunities in the future for staff like
Development Workers or Activity Co-ordinators. We will continue to review these
potential opportunities on a regular basis.
We have a strong, dedicated and flexible Volunteer base, who cover a variety of
activities and functions, including, our Community Larder / Warm Space ( including
food pickups and associated admin tasks ), our Community Cinema, Sports Pavilion
Activities, Parklives, various Community Events ( incl Skirt the Skeith, Party in the
Park, Kids Sports Day ) Meetings / Planning, Funding and our current Allotments /
Playing Field Projects. Across the year, our Volunteers contribute to cc4000 hours
volunteering time, which would equate to a £50,840 wage bill against the minimum
wage if that resource was employed. Moving forward, we will see this increase as
our Volunteering commitment to our Allotment Project grows. We are very proud of
this contribution to our community.   
We will also ensure that safe working practices are embedded into everything that
we do, and that all volunteers and customers are aware of the relevant risk
assessments for the site and are adhered to, flagging any issues as appropriate.
Improving local amenities
The community allotments will effectively transform the currently underused and
underutilised land into vibrant, productive spaces. This will improve the visual appeal
of the area and can increase feelings of safety and wellbeing. It is also envisioned
that the allotments will evolve into a broader community hubs, offering amenities
such as seating areas, tool libraries, composting facilities, and spaces for events or
education.
Future plans include hosting workshops on gardening, nutrition, and sustainability,
adding informal learning opportunities that benefit the wider community and helping
support Dalry Community Larder, further extending the reach as a public resource.
Overall impact
The creation of community allotments goes beyond gardening—they promote
278

Page 279

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
fairness by improving access to resources, empower residents through volunteering,
and enhance local amenities. Together, these changes help build stronger, healthier,
and more connected communities.
279

Page 280

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
8. What engagement has taken place in relation to the project?
Please include the number of people who have been engaged with or consulted as
well as the range of people.
This project was initiated pre COVID, and has run in tandem with our CAT journey
for the Sports Pavilion, which is currently at the Officers Assessment stage. The
Pavilion is a key part of our strategy to support both the allotments and the playing
fields. There have been various engagement opportunities over this period where we
have taken the opportunity to share our vision, and have included, Stalls at
Community Windfarm, Dalry Farmers Show, Carvers Event, Dalry Motor Show, Party
in the Park, Parklives, Garnock Valley Place Plan Event and also through our
Community Larder / Warn Space, Community Cinema Events. We have also
successfully secured the appropriate planning authorisation, having navigated that
journey, including, the appropriate consultations and objection opportunities, as part
of that process, with the support of our architect and North Ayrshire Council
Planning.
Our Project has also been specifically recognised through the Garnock Valley Place
Plan process. All of these interactions have meant that we have engaged with a
varied demographic across our community. 
We have visited other allotments and spoken to their members to ensure that we can
learn from their experiences to safeguard the success of our project.  Additionally,
we have also held discussions with Dalry Thistle academy coaches and
representatives from Garnock Rugby Club to align our vision with their requirements
280

Page 281

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
9. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment
opportunities in the Garnock Valley? Please include the number of
volunteering opportunities and employment opportunities
• If there are any staff requirements, please outline your HR plans 
Click or tap here to enter text. 
DCSC has been in existence for 19 years, over which time we have build up a very
good knowledge of the financial requirements of an organisation and a charity, which
is required to submit it’s audited accounts yearly. Our CAT journey for the sports
pavilion has also seen the need for us to produce 3 year financial projections. These
requirements have given both our Treasurer and Vice Treasure, a very good
understanding of the financial management required for this project. 
DCSC aims to use funds efficiently by:
• Sourcing affordable or donated materials 
• Using volunteer labour where possible 
• Investing in long-term assets (like durable tools or irrigation systems) 
They are also plans for future sustainability, such as small membership fees,
fundraising events, or additional grants to maintain the allotment after the initial
funding ends. 
DCSC has compiled a budget showing how the funding will be used to ensure that
the money is clearly allocated and aligned with the project’s goals, such as labour
costs, purchase of materials planning costs, etc.
A clear approval processes for purchases will be maintained to ensure all
expenditure is in line with the project priorities
All receipts and invoices pertaining to the project will be retained to maintain
accurate financial records. This ensures accountability and builds trust with the
funding provider.
281

Page 282

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
DCSC will:
• Track spending against the original budget
• Produce financial reports showing how money has been used
• Provide evidence of impact (e.g., number of plots created, volunteers
involved)
This will help demonstrate that the funding is being used effectively and for its
intended purpose.
The aim is for the allotment users to form a managing committee which will help
decide priorities and approve any further plans.  This will ensure that the plot holders
are at the forefront of decision making and that their needs and priorities are being
met 
We have been approached by a number of people who are looking to get involved as
a volunteer across various aspects of the project. DSM have also offered the
opportunity for their Apprentices to get involved, and we will also be looking to utilise
local businesses with the various construction stages.
We will also be looking to engage with North Ayrshire Council’s Social Care
Partnership to utilise it’s Community Payback Order scheme  as appropri
10. Amount of funding being requested
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”. 
Amount of funding requested (£100,000) Click or tap here to enter text.
Please give a breakdown of cost and recent quotations where appropriate.
Item Cost Quotation Supplied (Y/N)
Deer fencing, carpark,roads & paths 52,680.00
Kissing Gates 1,800.00
Field Gates 1,200.00
Soil / Compost Storage Bays 11,700.00
Composting Toilet 3,395.00
Containers x 4 21,621.60
Water Containers (12x1000ltrs) 2,520.00
Raised Beds (60) 15,000.00
Compost for Raised Beds 8,100.00
282

Page 283

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
Topsoil for Raised Beds 6,480.00
Power (Solar / Wind) 3,600.00
Poly Tunnel ( 20ft x 30ft ) 2,714.40
Tools / Equipment 3,000.00
Pitch Lining Machine 440.40
Goal Posts ( 8 x 24 ) 3,840.00
Goal Posts ( 7 x 21 ) 3,600.00
Goal Posts ( 6 x 12 ) 1,440.00
Nets ( 8 x 24 ) x2 76.80
Nets ( 7 x 21 ) 36.00
Nets ( 6 x 12 ) 28.80
Corner Flags ( 12 ) 192.00
Football/Rugby Goals 4,092.00
Fencing around Pitch Areas. 500m 19,200.00
Hand Wash Station 360.00
Ride on Mower 3,840.00
Rainwater Harvesting 3,000.00
Hedgerows and Trees 1,200.00
Signage 480.00
CCTV / Security 480.00
Surveys 6,388.80
Architect Fees and Planning 10,500.00
Please give a breakdown of details of match funding (if any)
Funder Amount Funding Secured (Y/N)
Mental Health & Wealth 20,000.00 Y
Postcode Lottery 10,000.00 Y
ASDA 3,000.00 Y
Shared Prosperity Fund 25,000.00 Y
Click or tap here to enter text.
283

Page 284

COMMUNITY INVESTMENT FUND
GARNOCK VALLEY LOCALITY PARTNERSHIP
11. Monitoring and evaluation process
Please include detail on the monitoring and evaluation processes planned or in
place.
Monitoring and evaluation are essential to make sure the allotment project is
achieving its aims (such as reducing inequality, increasing volunteering, and
improving local amenities) and using funding effectively. DCSC will set this up in a
structured but practical way:
Monitoring (ongoing tracking of progress)
Continuous monitoring will happen throughout the project and focus on collecting
regular data. DCSC will:
• Track participation levels: number of plot holders, volunteers, and visitors
• Record usage of the site: how often plots are used, attendance at events or
workshops
• Measure outputs: number of plots created, amount of food grown, number of
community activities delivered
• Financial monitoring: checking spending against the budget to ensure funds
are used correctly
• Surveys and feedback: asking participants about their experiences, skills
gained, and wellbeing
• Case studies: collecting personal stories that show how individuals have
benefited (e.g., improved diet or reduced isolation)
• Before-and-after comparisons: for example, comparing the condition of the
land or levels of community involvement before and after the project
• Impact on inequality: assessing whether the project reached targeted
groups or improved access to affordable food and green space
Reporting to stakeholders
Findings from monitoring and evaluation are shared with:
• The funding organisation (to show accountability)
• The local community (to maintain transparency and engagement)
284

Page 285

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Use of Animals at Public Events 
Purpose:  To seek Cabinet approval of Guidelines and Policy relating to the
use of animals at public events. 
Recommendation:  That Cabinet approves the Guidelines and Policy relating to the
use of animals at public events at Appendix 1. 
1. Executive Summary 
1.1 The Council owns, or is responsible for, areas of land which from time to time are used
to hold events of varying types and size. Over the past few years, discussions have
taken place at various forums regarding the degree of control the Council has over
community events and any potential risks that this might present. This has, however,
largely been in the context of wider event controls and licensing which have now been,
or are being, addressed. 
1.2 At the full Council meeting on 14 May 2024, a motion was carried which instructed
officers to carry out a review of Council policy in relation to the ban on letting Council-
owned sites to organisations which utilise animals in the provision of entertainment.
Although the effective ban on letting Council land where animals are used for public
entertainment has been in place since 2012, this has been strengthened since 2018
when the Scottish Government enacted legislation which makes it an offence for circus
operators to use wild animals in a travelling circus whilst in Scotland. 
1.3 This report provides an update on the current position and seeks approval of proposed
guidelines and policy for the use of animals at public events.   
2. Background 
2.1 Since 19 September 2012, as a result of a motion carried at a meeting of North Ayrshire
Council, the letting of Council owned sites to travelling circuses or similar organisations
which utilise animals in the provision of entertainment has been banned. 
2.2 On 15th May 2024, a further Council motion was carried, which instructed officers to
carry out a review of Council policy around the following principles: 
Agenda Item 15
285

Page 286

• That Council adopts a refreshed approach to limit and control the presence of
animals for entertainment in our venues, highways, parks and open spaces,
where it is legally possible to do so
• That normally Council would not support animals being out of their natural
environments for events where there is no clear benefit of education,
competition leading to national competitions or recognised need for a
competitive event. Any approval for the presence of animals would require to
take account of animal welfare concerns, including appropriate refuge from
crowds
• That pet shows for domesticated animals at community events would be
permissible
• That the policy would cover considerations of land and premises use
permissions, grant giving/conditions and licence 
2.3 Although the effective ban on letting Council land where animals are used for public
entertainment has been in place since 2012, this has been strengthened since 2018,
when the Scottish Government enacted legislation which makes it an offence for
circus operators to use wild animals in a travelling circus whilst in Scotland. 
2.4 As a result of the general events development work by officers, discussions have
taken place at both a Pan-Ayrshire level and internally with services such as
Streetscene, Legal and Estates, to establish baseline information and how best to
proceed with ensuring that best practice is adhered to and the terms of the motion are
considered and met, as well as considering how this fits into the wider requirements to
ensure we have a robust and sustainable event safety resource to meet statutory
requirements, as well as local needs and demands. 
2.5 The current policy, which is strictly adhered to in relation to commercial activities and
events, as well as the ongoing effectiveness of the national legislation noted above,
results in very few issues being reported to officers in relation to the use of animals on
Council land. The policy and the legislation however, only cover travelling circuses
and other such organisations. 
2.6 Officers are aware that some events on Council owned land do involve animals at
present. These generally take the form of educational activities and displays.
Currently, the Council’s Community Facilities team have a form which requires to be
completed when a let is being agreed, and animals are proposed as part of the
event. As part of their considerations, the Community Facilities team consult,
where required, with the Council’s Animal Health and Welfare Officer in Trading
Standards for advice. Occasionally permission is not granted to have animals on their
premises if there is no clear educational link. This has resulted in a few complaints. 
2.7 In relation to other community events, both on Council land and on
private property, previously it was not often clear or obvious whether animals were to
be involved in the event. As an interim measure, and to inform this work, there is
now an option on the online Community Event application form to notify the Council
that animals will be present. 
2.8 An assessment of the impact and suitability of the animals at events will still be
required. At present, this is best placed with the responsible manager for the premises
or the officer agreeing the let or permitting the event to take place when it relates to a
286

Page 287

Council property, and with the event organiser - with the appropriate guidance from
Council officers - when on private land.   
2.9 The proposed policy and guidelines at Appendix 1 do not sit alone in the wider event
safety and control work of the Council; this work has developed significantly over the
past few years and includes: 
• Ayrshire Local Resilience Partnership (ALRP) review of event safety
arrangements across Ayrshire.
• Firework Control Zone Request Process
• Bonfire Permission Process
• Updated Public Entertainment Licence (PEL) Resolutions (bringing more events
under the control of a PEL  
• Agreed Pan Ayrshire Safety Advisory Group Policy
• Agreed Pan Ayrshire Safety Advisory Group Matrix, which determines which
events require additional scrutiny. 
• Ongoing Pan Ayrshire/multi- agency work in relation to the Terrorism (Protection
of Premises) Act 2025 (otherwise known as Martyn’s Law) 
The revised PEL resolutions are of note and bring North Ayrshire into line with other
authorities for bonfires and fireworks especially, which were essentially the catalyst for
the concerns relating to events on Council land. 
2.10 The draft policy and guidance at Appendix 1 focuses strictly on animal welfare
matters. Health and safety matters (e.g., risk assessment, insurance, hand washing,
waste disposal, crowd segregation, etc.) would be addressed as part of the normal
Safety Advisory Group process, and/or through normal Environmental Health and or
Licensing considerations. Enforcement of any animal welfare issues may include any
or all of the following bodies: Trading Standards; Police Scotland; Scottish Society for
the Prevent of Cruelty to Animals. 
3. Proposals 
3.1 That Cabinet approves the policy and guidelines for the use of animals at public events
at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 The Council requires to meet its legal obligations in relation to events and event safety;
the proposals contained in this report will enhance the Council’s response. 
287

Page 288

Equality/Socio-economic 
4.4 None 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The proposals contained within this report, ensuring that we have safe and compliant
events in North Ayrshire, support North Ayrshire Council Plan strategic priorities in
relation to ‘Wellbeing’; ‘Communities and Local Democracy’; and ‘A Sustainable
Council’. 
Community Wealth Building 
4.7 None 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 The proposals contained within this report, ensuring that we have safe and compliant
events in North Ayrshire, supports the delivery of the consumer duty, particularly in
relation to the ‘Access’ and ‘Safety’ principles, by ensuring legislation and regulation
are upheld, and by considering and where possible addressing issues likely to cause
harm. 
5. Consultation 
5.1 Consultation has taken place both internally and externally, including at Pan Ayrshire
level, as part of the extensive and ongoing event safety work led by the Ayrshire Local
Resilience Partnership. 
David W. Hammond
Executive Director (Communities and Housing) 
For further information please contact Scott McKenzie , Senior Manager (Protective
Services), on 01294 324347. 
Background Papers
288

Page 289

• Meeting of North Ayrshire Council, 19th September 2012 -  Agenda Document Pack
• Meeting of North Ayrshire Council, 15th May 2024 - Agenda Contents 
289

Page 290

Appendix 1 
North Ayrshire Council - Draft Guidelines and Policy for Animals at Public Events 
The use (for performance, display or exhibition) of wild animals in travelling circuses is
prohibited under the Wild Animals in Travelling Circuses (Scotland) Act 2018. 
In all other cases, if an event is the subject of a Public Entertainment Licence, any and all
conditions pertaining to animals shall be adhered to. 
General Considerations
• Events including animals which are organised by a recognised and approved body will
generally be permitted e.g. dog shows, sheep dog trials, horse racing etc. if all other event
related approvals are in place and the organisations credentials are checked.
• Events including animals where there is a recognised cultural or historic significance will
generally be permitted if all other event related approvals are in place.
• Events including animals which have an educational and/or therapeutic purpose will
generally be permitted if all other event related approvals are in place. This will require
some consideration by the responsible manager/event organiser as an activity which is
considered educational or therapeutic in one setting may not be so in another. 
Animal Welfare
Events which include animals including agricultural shows, ridings or theatre productions
must ensure that best welfare practices are observed. 
• A performing animal licence is required for anyone who exhibits or trains a performing
animal.
• A welfare plan should be drawn up which covers all reasonably foreseeable risks and
veterinary personnel available to ensure prevention of infectious diseases and also
treatment in the event of accidents. 
• The welfare plan should also take account of the five freedoms as set out in the Animal
Health and Welfare (Scotland) Act 2006:
o Freedom from hunger and thirst by ready access to fresh water and a diet to
maintain full health and vigour.  
o Freedom from discomfort by providing an appropriate environment, including
shelter and comfortable rest area. 
o Freedom from pain, injury or disease by prevention or rapid diagnosis and treatment 
o Freedom to express normal behaviour by providing sufficient space, proper facilities
and company of the animal’s own kind. 
o Freedom from fear and distress by ensuring conditions and treatment that avoid
mental suffering. 
• As with all (human) attendees at an event, the event organiser also has a duty of care to
ensure the safety and well-being of animals.
290

Page 291

Version: 7.0
North Ayrshire Council
Equality & Children’s Rights Impact Assessment
(Screening Form)
Please Note: Before you begin, is this version the most up to date?  You can
download the most recent version on Connects. Screenings and ECRIAs should be
included with relevant Committee Reports and may be published on our website.
This screening form encompasses key pieces of legislation which the Council needs to
assess its activities against. This form should assist in deciding whether a full impact
assessment is required.
• The Public Sector Equality Duty requires that we demonstrate that we are making
decisions in a fair, transparent and accountable way. The Council must show that it
has considered the needs and rights of people with protected characteristics.
• Where decisions affect young people, we must consider the ‘Rights of the Child’,
under the United Nations Convention on the Rights of the Child (UNCRC).
• We must consider the Socio-Economic Impact under the Fairer Scotland Duty. 
• We need to consider whether any of our Islands may be impacted differently from
the mainland under the Island’s Act.
• We also need to consider whether ‘consumers’ of our Services will be impacted
under the Consumer Duty.
The various duties require the Council to assess the ‘impact’ of proposals thoroughly
before any decisions are taken. This should be proportionate to the decision that is being
made and should be carried out as early as possible in the process. It can then be
repeated as the policy/proposal is progressed. Further Guidance on carrying out an
impact assessment can be found in our Equalities pages on Connects.
1. Proposal
Title: Use of Animals for Entertainment on Council Land
Budget reference number and heading if appropriate (or not applicable):
N/A
Amount (£) of saving if appropriate (or not applicable): 
N/A
Service: Housing and Public Protection (but policy impacts all services)
Lead officer: Scott McKenzie 
List of participants in the assessment: Scott McKenzie 
Date completed: 25/03/2025
291

Page 292

Version: 7.0
2. What are the main aims of the proposal?
The proposal is to create a policy which provides a framework to facilitate
consideration of the animal health and welfare issues associated with the use
of animals for entertainment purposes on Council land. 
3. What data, research or other evidence was used for this
screening?
A report prepared for ELT on the 1st April 2026 forms the basis of the evidence,
with this in turn having been informed by extensive research, discussions with
other local authorities and internal working groups and discussions across the
relevant council services such as Estates, Legal, Streetscene and Protective
Services. The overarching legislative framework is the Animal Health and
Welfare (Scotland) Act 2006.  
4. Screening questions
Does the proposal affect service users, employees or the wider community –
particularly services that are known to be important to protected groups?
Please delete whichever statement is not applicable from the text below:
Yes, the proposal does affect service users, employees or the wider community and
specifically to services that are known to being important to particular protected
groups.
No, the proposal does not affect service users, employees or the wider community
and specifically to services that are known to being important to particular protected
groups.
Is it a major proposal, significantly affecting how services are delivered or how
other organisations operate?
Please delete whichever statement is not applicable from the text below:
Yes, it is a major proposal, significantly affecting how services are delivered or how
other organisations operate. 
No, it is not a major proposal, significantly affecting how services are delivered or
how other organisations operate.
Does it relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes? 
Please delete whichever statement is not applicable from the text below:
Yes, it does relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes.
292

Page 293

Version: 7.0
No, it does not relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes. 
293

Page 294

Version: 7.0   
5. Impact
Are there any impacts on the following groups?
Age (young/old people); Disability (physical and learning disabilities); Gender Re-
assignment; Pregnancy and Maternity; Race and Ethnic Origin; Religion or Belief;
Sex; Sexual Orientation; Marriage and Civil Partnership; Care Experienced; Fairer
Scotland Duty; Human Rights; Other (Homelessness, rural, carers, part-time
workers, etc)
Yes (please list)
No
Unsure
If yes or unsure, you should consider carrying out a full impact assessment.
Click or tap here to enter text.
6. The Fairer Scotland Duty – (reducing the socio-economic
impact of our policies, strategies and budget decisions)
Does the proposal have any negative (or potential) positive impacts
that need to be explored in more detail? (Please provide a brief
summary)
The proposal is centred on animal health and welfare and therefore this does
not apply. 
7. Children’s Rights (UNCRC)
Does the proposal have any impact in relation to the UNCRC articles for
Children’s Rights?
The proposal is centred on animal health and welfare and therefore this does
not apply. The proposal would prevent access to animals at events which were
considered to be kept or showed under poor health and welfare conditions. In
such circumstances there would be limited opportunities in terms of articles 28
and 31 anyway.  
8. Island Proofing
Are there any special considerations for the island communities
within North Ayrshire?
The proposal is centred on animal health and welfare and therefore this does
not apply. 
294

Page 295

Version: 7.0   
9. Consumer Duty
Is your proposal a decision that will impact on consumers? (The
definition of consumer is ‘an individual or a small business that
purchases, uses or receives goods or services in Scotland, that are
supplied either by a business or a public body’.  Please see What is
the Consumer Duty for more details) 
Click or tap here to enter text.
10. Have any cross-cutting impacts been identified from other
Council Services or Partner Agencies (such as discrimination
across multiple groups or accumulated effects of multiple
proposals on a single group)?
The proposal is centred on animal health and welfare and therefore no impacts
have been identified.   
11. Has there been any engagement or consultation on the
proposal with any groups, services or partner organisations
that could help inform the impact assessment?
As the proposal is centred on the established Animal Health and Welfare
Scotland Act consultation on the principles would have taken place during the
legislative process. The implementation in terms of a policy have been
discussed with the relevant Council services. 
12. What are the monitoring and review arrangements?
The policy will be reviewed on a regular basis or when any issues or learning
points are identified. 
13. Considering this Equality Screening in its entirety, what is your
recommended next step? (Please explain your decision.)
Screening Only no further assessment is required.  (Your explanation must
include how this decision will be monitored and reviewed as the policy /
decision is implemented.)
The policy will be progressed through ELT, PAP and Cabinet and if any
potential impacts are identified this will be reconsidered. Likewise it will be
further considered at the point of review, likely to be in 1 years time initially. 
Or
Full Impact Assessment Required
Click or tap here to enter text.
295

Page 296

Version: 7.0   
14. Authorisation
Policy Lead/Manager:
Date: 25/03/2026
Head of Service: Click or tap here to enter text.
Date: Click or tap to enter a date.
296

Page 297

NORTH AYRSHIRE COUNCIL
2 June 2026
Cabinet
Title: North Ayrshire Housing Acquisition Strategy
Purpose: To seek Cabinet’s approval of the proposed Housing
Acquisition Strategy 2026-2031.
Recommendation: It is proposed that Cabinet approves the proposed North
Ayrshire Housing Acquisition Strategy at Appendix 1.
1. Executive Summary 
1.1  Housing to 2040 continues to be the Scottish Government’s overarching
strategy that sets out their vision and roadmap for ensuring everyone has a
safe, good quality and affordable home that meets their needs, in the place
they want to be, by 2040. 
1.2  The Scottish Government declared a national housing emergency in May 2024.
In September 2025, the Scottish Government released their Housing
Emergency Action Plan which comprises new, enhanced, and accelerated
actions, reflecting their determination to go further and faster in their
commitment to tackling the housing emergency during the remainder of this
Parliament and beyond. 
1.3  The proposed North Ayrshire Housing Acquisition Strategy will support the
Scottish Government’s objective of expanding the scale of acquisitions to
increase overall housing supply. 
1.4  The Strategic Housing Investment Plan (SHIP) 2026-2031 sets out the priorities
and locations for affordable housing investment by the Council and registered
social landlords in North Ayrshire over the five-year period, to support the
outcomes in the Local Housing Strategy. 
1.5  The Strategic Housing Investment Plan 2026–2031 aims to secure investment
for the delivery of a total of 1,038 properties – 741 by the Council and 297 by its
RSL partners - providing sustainable, affordable, accessible, and high-quality
homes which will contribute to the wider regeneration aims for the area. 
1.6  The North Ayrshire Local Housing Strategy 2023-2028 was approved by
Cabinet on 13 June 2023 and sets out the strategic ambition for Housing in
North Ayrshire: “we want all our people to live in the right homes, in great
places, with access to any support services they need”. Four overarching
outcomes were developed to achieve this ambition, which align to our Council
Agenda Item 16
297

Page 298

Plan and the four key strategies in the Scottish Government’s ‘Housing to 2040’
vision. 
1.7  The proposed North Ayrshire Housing Acquisition Strategy will support the
following LHS actions: 
• Deliver 1,666 new units of social housing
• Consider opportunities to provide homes in and around our town centres 
• Support the Scottish Government's target to deliver 110,000 new affordable
homes by 2032 by delivering the projects set out within the Strategic
Housing Investment Plan
• Increase the social housing supply by buying back former social housing 
• Bring empty homes back into use through the buyback scheme
• Ensure that the Strategic Housing Investment Plan addresses current and
future demographic needs. 
1.8  The Housing Acquisition Strategy will contribute to the SHIP, helping to achieve
the Council Plan priorities and strategic aims by: 
• Through our housebuilding programme and wider housing investment,
providing homes for life that meet the needs of our residents
• Increasing the number of homes in the area through a mix of private and
social developments and bringing empty buildings back into use 
• Ensuring our places and spaces where we live, work and visit are well
maintained and accessible
• Reducing the carbon footprint of our estate through rationalisation utilising
a locality-based approach and taking a fabric first and low carbon energy
generation approach to homes and buildings 
2. Background 
2.1  It is recognised that purchasing ex-local authority stock is an effective way to
increase social housing stock and provide value for money for the investment
made, and the SHIP 2025-2030 increased the Council’s buyback scheme to 60
properties by 31 March 2030. The Council’s developing Registered Social
Landlord partners have also included buyback programmes within the SHIP,
aiming to acquire a further 29 new homes. 
2.2  Five former social housing properties were purchased by the Council in
2023/24 to increase the affordable housing supply through the SHIP 2024-2029
buyback scheme, achieving our target of purchasing five properties during that
year. 33 properties were also acquired for Ukrainian Displaced Persons in the
last quarter of 2023/24, which were fully funded by the Scottish Government.
The Council and its partners acquired three buybacks utilising SHIP funding
during 2024/25; the Council purchased two homes for the Council’s buyback
programme and Cairn, in partnership with ANCHO, bought back one home.
Trust Housing Association also acquired two homes on Arran in 2024/25 and
three in 2025/26 utilising the Scottish Government’s Rural Affordable Homes for
298

Page 299

Key Workers Fund, and they are actively pursuing another six on the island at
the start of 2026/27. 
2.3  The revised North Ayrshire’s Resource Planning Assumption for 2025/26 was
£16.125m. During March 2026, the Scottish Government provided Resource
Planning Assumption figures for the next four years to 2029-2030 as follows: 
• £16.889m for 2026/27
• £17.396m for 2027/28 
• £17.918m for 2028/29 
• £18.455m for 2029/30 
£2.647m of the total RPA has been allocated for second hand and empty home
acquisitions over the five years to 2031. 
2.4  The Affordable Housing Supply Programme can support the following types of
purchase where there is a strategic housing need, as identified and agreed by
the local authority: 
• Open market purchases with vacant possession
• Off-market purchases with vacant possession
• Purchases where an owner occupier cannot afford the required
maintenance or refurbishment of their home and wishes to sell and remain
in the home as a tenant in the social rented sector
• ‘Off the shelf’ purchases from developers
• Properties from landlords leaving the private rented sector with a tenant in
situ, where this meets a clear strategic purpose and where the tenant is at
risk of homelessness 
2.5  Private housing (owned by individuals or private landlords) forms 73% of all
homes in the area, with the remaining 27% being owned and rented by North
Ayrshire Council and local Registered Social Landlords (RSLs). The cost of
buying a home in North Ayrshire is significantly lower than the national average. 
2.6  As at April 2026, there were currently 6,155 applicants on the North Ayrshire
Housing Register, with 3,401 assessed as having a housing need. 
2.7  The current pace of the second-hand property market means that it has proven
difficult to acquire homes from the private market to meet our buyback scheme
as set out in the SHIP. To address this challenge, we identified the need to
develop an acquisition strategy and review our internal procedures. 
2.8  The Scottish Government supports acquisitions to bring existing homes into
use more quickly, increase affordable supply, and make efficient use of public
investment. 
2.9  The North Ayrshire Acquisition Strategy has been developed to ensure that the
Council continues to meet affordable housing need and demand across North
Ayrshire by increasing the availability of permanent social rented homes, and to
299

Page 300

ensure funding is maximised and value for money is demonstrated across
various 
funding streams. The new strategy has identified the opportunity to consider
“Off the-shelf” acquisitions which can be a strategic tool to rapidly increase the
supply of social homes and meet urgent local housing needs, including
reducing the use of costly temporary accommodation, and can offer value for
money compared to other housing delivery options. 
2.10  To be considered for acquisition, properties must support one or more of the
objectives of the strategy and must meet one or more of the criteria of the
strategy. 
2.11 Objectives 
• Help achieve the strategic outcomes set out in the Local Housing Strategy:
• More homes at the heart of great places
• Affordability & choice
• Affordable warmth & zero emissions
• Improving the quality of our homes
• Meet demand in the highest need areas, as identified through the Housing
Needs and Demand Assessment (HNDA) and ongoing demand analysis. 
• Assist in delivering the Strategic Housing Investment Plan, which sets out
the affordable housing investment priorities within North Ayrshire 
• Utilise opportunities to acquire properties on the open market or through
speculative approaches from owners, where this supports strategic housing
need
• Increase the number of long-term empty properties brought back into use,
through effective collaboration with the Council’s Private Sector Housing
Advice Team.
• Continue to assess any opportunities for acquisition that arise in suitable
housing supply influenced through the impact of the application of the
100% premium in Council tax for second homes, across the mainland and
both island communities.
• Enhance block sustainability and support future maintenance by increasing
Council ownership in partially factored blocks through proactive
engagement with private owners.
• Support the reduction of homelessness by ensuring, where appropriate,
that acquired properties contribute to meeting the housing needs of
households in temporary accommodation. 
2.12 Criteria 
A property must meet specific requirements to demonstrate best value for
money and alignment to the need and demand in North Ayrshire. Therefore, to
be considered by North Ayrshire Council for acquisition, properties will form
part of the overall social rented stock once purchased and must - in addition to
being of a property type or size with an evidenced need or demand - meet one
or more of the criteria below, in addition to any other criteria specified:
300

Page 301

• Ex-local authority stock, within North Ayrshire Council estates, which will
facilitate effective and efficient housing management
• Located in an area identified as having an affordable housing shortfall
• Long term empty properties, where the purchase would allow for greater
local amenity and contribute to the Council’s statutory duties and strategic
objectives
• ‘Off the shelf’ purchases from developers 
• Purchase will be less than the development costs of building a comparable
property. Properties which cost more than this will be considered on a
case-by-case basis, e.g., if the property is highly adapted and meets the
requirements of an applicant with an accessible housing need
• The purchase price is equal to, or a reduction of, the actual market value as
assessed by the Council’s valuation report/ home report valuation.
Properties which cost more than this will be considered on a case-by-case
basis, e.g., projects in regeneration areas; remote, rural or island areas; or
involving housing for people with particular/ specialist needs
• The property will be able to achieve and be maintained to a standard
acceptable to the Council, e.g. to the SHQS and EESSH2/ SHNZS
• Of standard construction only (due to the legal and cost implications they
could incur if otherwise). 
2.13 Any decision to acquire a property is at the discretion of North Ayrshire Council
and is subject to the availability of relevant funding. If purchased, properties will
be improved to meet the Scottish Housing Quality Standard (SHQS) and the
Energy Efficiency Standard for Social Housing (EESSH2)/ Social Housing Net
Zero Standard (SHNZS). 
2.14 Four acquisition workstreams are currently being utilised in North Ayrshire: 
• Strategic Housing Investment Plan (SHIP) 
• Affordable Housing Initiative for Key Workers 
• Estate Based Regeneration Programme 
• Void and Acquisition Fund 
2.15 SHIP: The SHIP 2026 to 2031 makes provision for empty and second home buy
backs, with the Council’s Private Sector Advice Team providing advice and
assistance on empty homes. As at 1 April 2026, there are 582 empty homes
subject to the Council Tax levy in North Ayrshire. Additionally, there are
approximately 1,500 second homes in North Ayrshire, the majority of which are
located on the islands of Arran and Cumbrae. 
2.16 Bringing former social housing stock into ownership can assist with housing
management, maintenance issues, and increase housing available through the
North Ayrshire Housing Register. Over the past four financial years the Council
has acquired four empty homes, using funding from the Affordable Housing
Supply Programme, which have been brought back into use as Council stock. 
301

Page 302

2.17 North Ayrshire Council may purchase properties for the use of specific applicant
needs where no suitable Council or RSL property exists and where the cost of
purchasing the property would be more cost effective than making adaptations
and alterations to existing stock. Properties should be purchased with vacant
possession however North Ayrshire Council may consider purchasing private
rented or owner-occupied properties where the tenancy or ownership is at risk,
and the property has been substantially adapted in a major, permanent way to
meet the needs of the tenant or household. The tenant or owner should have a
live North Ayrshire Housing Register application and there should be no
suitable Council or RSL property which meets the needs of the applicant
(including consideration of the costs of adapting existing stock). 
2.18 ‘Off-the-shelf’ property acquisitions have been included in the Acquisition
Strategy to allow consideration, should suitable developments come forward
that provide good value for money compared to the average costs of
developing our own new build properties from scratch. This strategic approach
can rapidly increase the supply of social homes and meet urgent local housing
needs, including reducing the use of costly temporary accommodation. Key
considerations for OTS property acquisitions include development availability
and timing, location compared to where our need and demand assessments
have identified, house type and layout compared to our needs within that
location, specification the developer will build to, cost per unit, and future
maintenance and estate management requirements. This is a new area under
active consideration by officers to identify any viable opportunities within North
Ayrshire. Should a viable opportunity be identified, this will be presented to
Cabinet for approval. 
2.19 The Rural Affordable Homes for Key Workers Fund, previously known as
the Rural Key Workers Housing Fund, provides up to £25 million nationally
through to March 2028 to help local authorities identify affordable homes for
key workers in rural communities. This funding is made available from the
Affordable Housing Supply Programme and therefore is only accessible to local
authorities and RSLs. Key workers can include public sector and emergency
service workers; however, the definition of a key worker is determined on an
individual basis by local authorities according to their local priorities. In North
Ayrshire, the Arran Local Lettings Initiative provides an example of a definition
of key workers, taking a tiered approach. 
2.20 Guidance provided by the Scottish Government on the Rural and Key Workers
Housing Fund outlines that local authorities and RSLs can use the fund to
purchase existing suitable properties in rural areas, which can be rented
directly or leased to employers to provide affordable homes for key workers.
This can include: 
• Bringing empty properties back into use, or 
• Acquiring properties on the open market to increase the available supply of
affordable homes for key workers. 
2.21 Void and Acquisition Fund: The Scottish Government agreed to invest at least
£60 million through the Affordable Housing Supply Programme (AHSP) in 2023
302

Page 303

to 2024 to support a National Acquisition Programme. Building on the National
Acquisition Programme, the Scottish Government announced in April 2024 that
£80 million would be added to the Affordable Housing Supply Programme over
2024 to 2025 (£40 million) and 2025 to 2026 (£40 million). Resultantly, in
September 2024, the Scottish Government increased North Ayrshire Council’s
Resource Planning Assumption. This uplift was to be directed towards: 
• Acquisitions to help address temporary accommodation pressures, or 
• To bring long term voids back into use. 
2.22 In 2024/25, one property was bought using this fund and in 2025/26, five
properties were bought using this fund. 
There is no separate funding for acquisitions for 2026/27 and beyond; this
reflects the Scottish Government’s aim of giving flexibility to local authorities to
determine their appropriate priorities between new builds and second-hand
acquisitions. If any such fund becomes available, North Ayrshire Council will
engage with the Scottish Government and stakeholders to make the most
effective use of any funding that may become available for North Ayrshire. 
2.23  Estate Based Regeneration Programme (EBRP): In January 2019, the
Council’s 10-year, £10 million EBRP was approved. The aim of the EBRP is to
improve Council-owned housing estates across North Ayrshire by addressing
low demand stock, antisocial behaviour, external appearance, parking
provision, road and footpath condition, fencing, landscaping, and general
grounds maintenance issues. The Housing Regeneration Team will acquire
properties identified in the EBRP for the purposes of: 
• Demolition
• Refurbishment
• Purchasing four-in-a-block flats where this would result in the Council’s
majority ownership in the block 
2.24 The SHIP 2026 to 2031 includes for the provision of funding for 249 units to
assist the delivery of Housing’s Estate Based Regeneration Programme. This
investment programme aims to provide new homes to replace any stock which
requires to be demolished or reconfigured as part of the EBRP. 
2.25 The proposed approach allows North Ayrshire Council to ensure they are
maximising the funding streams available whilst targeting properties that meet
the strategic needs for the areas through a range of acquisition opportunities.
Acquisitions will sit within the Housing Strategy Team to ensure that our
housing acquisitions meet the strategic needs identified through the Local
Housing Strategy, Housing Need and Demand Assessment, Strategic Housing
Investment Plan, Local Housing Plans, Scheme of Assistance, and the
Homeless Prevention Strategy. 
2.26 The ECRIA screening has been conducted, and it has determined that a full
assessment is not required for this strategy. A full ECRIA has been completed
for the Local Housing Strategy, which includes acquisitions.
303

Page 304

3. Proposals 
3.1  That Cabinet approves the North Ayrshire Housing Acquisition Strategy 2026 -
2031 at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial
4.1  The financial implications arising from targeted housing acquisitions are
accounted for within existing 2026-2031 HRA budgets. Business cases will be
developed to support any new initiatives, as required. 
Human Resources 
4.2  None. 
Legal
4.3  Housing Services will continue to liaise with Legal Services, where required, to
facilitate housing acquisitions. 
Equality/Socio-economic
4.4  The Housing Acquisition Strategy will have a positive impact by aiming to
increase the availability of permanent homes to meet the affordable housing
need and demand in North Ayrshire. An ECRIA screening has been conducted
for the Housing Acquisition Strategy, and it has determined that a full
assessment is not required. A full ECRIA was completed for the Local Housing
Strategy 2023-2028, which includes acquisitions. 
Climate Change and Carbon
4.5  The Housing Acquisition Strategy will support the Sustainable North Ayrshire
Strategy 2024 - 2027, which aims to eradicate fuel poverty and achieve net-
zero carbon status by 2030, by ensuring that homes acquired by the Council
are brought up to appropriate sustainability standards. 
Key Priorities 
4.6  The Housing Acquisition Strategy will support the Council Plan strategic
priorities: ‘Wellbeing;’ ‘Climate Change;’ ‘A Sustainable Council;’ and
‘Communities and Local Democracy.’ by increasing the number of affordable
homes in North Ayrshire that meet residents’ needs. 
Community Wealth Building
4.7  None
304

Page 305

Islands Communities Impact Assessment (ICIA) 
4.8 The Housing Acquisition Strategy does not identify unique impacts faced
specifically by our islands. Whilst the strategy covers the whole of North Ayrshire,
it is fully recognised that delivering homes on islands can be more complex and
expensive than on the mainland. Under existing arrangements, NAC Housing
services work closely with the Registered Social Landlords (RSLs) on our islands
and provide support where required. This can include supporting applications to
the Scottish Government for additional funding to help the RSL make a housing
acquisition where property prices are higher than they would be on the mainland. 
United Nations Rights of the Child (UNCRC) 
4.9  It is anticipated that the Housing Acquisition Strategy will lead to positive impacts
on children and young people, as more children will have access to safe and
well-maintained housing through an increase in the availability of permanent
homes to meet the affordable housing need and demand in North Ayrshire. 
Consumer Duty  
4.10 Acquiring housing and improving it to the standards required helps to improve
overall housing condition, increases social/affordable housing stock, and helps
to bridge some of the gap between supply and demand in relation to new build
programmes. The acquisition of housing can further assist our island and rural
communities through additional provision of affordable housing for e.g., key
workers in areas where there is identified need. Housing acquisitions are also
usually quicker to complete sales on and for a lower cost than that of new build
housing.  This in turn means that, through property acquisitions, our consumers
e.g., those on the Common Housing Register, will be positively impacted through
increased stock, in turn improving their chances of getting a new affordable
home. 
5. Consultation
5.1 Prior to development of the strategy, cross-service meetings were held to
determine key objectives and criteria, with attendees from Building Services,
the Private Sector Housing Team, Homeless & Community Safety, Housing
Strategy, Business Improvement, Business Planning, Affordable Housing &
Regeneration, and Governance. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Fiona Ellis, Senior Manager (Housing
Strategy & Development), on 01294 324031. 
Background Papers
305

Page 306

Local Housing Strategy 2023 to 2028
Strategic Housing Investment Plan 2026 to 2031 
306

Page 307

Appendix 1 
NORTH AYRSHIRE
Housing Acquisition Strategy
2026 to 2031 
307

Page 308

1 
Contents 
1. Introduction ......................................................................................................................................... 2
Background to the Strategy ................................................................................................ 2
Affordable Housing Supply Programme ............................................................................... 2
Aim of the Strategy ............................................................................................................. 2
Objectives of the Strategy ............................................................................................................ 2
Criteria and Value for Money ........................................................................................................ 3
2. Acquisition Programmes ..................................................................................................................... 4
Strategic Housing Investment Plan ...................................................................................... 4
Empty Homes & Second Homes .................................................................................................. 4
Adaptations .................................................................................................................................... 5
Affordable Housing Initiative for Key Workers ............................. Error! Bookmark not defined.
Void and Acquisition Fund ......................................................... Error! Bookmark not defined.
Estate Based Regeneration Programme .............................................................................. 6
3. Further Information .............................................................................................................................. 7
Budget ............................................................................................................................... 7
Resources .......................................................................................................................... 8
Equal Opportunities ............................................................................................................ 8
Review ............................................................................................................................... 8 
308

Page 309

2 
1. Introduction 
Background to the Strategy
North Ayrshire Council’s Local Housing Strategy 2023 to 2028 commits to increasing the social
housing supply by buying back former social housing stock and bringing empty homes back into
use through buy backs. However, in line with the aim of the strategy, North Ayrshire Council will
explore other viable solutions, particularly where properties in demand have not been built by
North Ayrshire Council or other social housing providers. This will include purchasing homes
from the open market, developers, and off-the-shelf purchases. To target acquisitions that will
have the most effective impact, the Council will take a comprehensive approach by comparing
current need and demand to current supply and stock turnover. 
For more information on the Local Housing Strategy 2023 to 2028, visit the Local Housing
Strategy page on the North Ayrshire Council website. 
Affordable Housing Supply Programme
The Affordable Housing Supply Programme comprises a range of funding mechanisms to enable
affordable housing providers to deliver homes for social rent, mid-market rent, and low-cost
home ownership in communities across Scotland to support local authorities’ Local Housing
Strategies.
The Affordable Housing Supply Programme can support the following types of purchase where
there is a strategic housing need, as identified and agreed by the local authority:
• Open market purchases with vacant possession
• Off market purchases with vacant possession
• Purchases where an owner occupier cannot afford the required maintenance or
refurbishment of their home and wishes to sell and remain in the home as a tenant in the
social rented sector
• “Off the shelf” purchases from developers
• Properties from landlords leaving the private rented sector with a tenant in situ, where
this meets a clear strategic purpose and where the tenant is at risk of homelessness
For more information on the guidance, visit the Acquisition Programme: information page on the
Scottish Government website.
Aim of the Strategy
The aim of this strategy is to increase the availability of permanent homes to meet the affordable
housing need and demand in North Ayrshire. 
To be considered for acquisition, properties must support one or more of the objectives of the
strategy and must meet one or more of the criteria of the strategy. 
Objectives of the Strategy
• Meet demand in the highest‑need areas, as identified through the Housing Needs and
Demand Assessment (HNDA) and ongoing demand analysis.
• Assist in delivering the Strategic Housing Investment Plan, which sets out the affordable
housing investment priorities within North Ayrshire
• Help achieve the strategic outcomes set out in the Local Housing Strategy:
o More homes at the heart of great places
309

Page 310

3 
o Affordability & Choice
o Affordable Warmth & Zero Emissions
o Improving the quality of our homes
• Identify opportunities to acquire properties on the open market or through speculative
approaches from owners where this supports strategic housing need
• Increase the number of long‑term empty properties brought back into use through
effective collaboration with the Council’s Private Sector Housing Advice Team.
• Continue to assess any opportunities for acquisition that arise in suitable housing supply
influenced through the impact of the application of the 100% premium in Council tax for
second homes, across the mainland and both island communities.
• Enhance block sustainability and support future maintenance by increasing Council
ownership in partially factored blocks through proactive engagement with private
owners.
• Support the reduction of homelessness by ensuring, where appropriate, that acquired
properties contribute to meeting the housing needs of households in temporary
accommodation.
Criteria and Value for Money 
A property must meet specific requirements to demonstrate best value for money. Therefore, to
be considered by North Ayrshire Council for acquisition, properties will form part of the overall
social rented stock once purchased and must – in addition to being of a property type or size with
a recognised need or demand - meet one or more of the criteria below, in addition to any other
criteria specified:
• Ex-local authority stock, within North Ayrshire Council estates, which will facilitate
effective and efficient housing management.
• “Off the shelf” purchases from developers
• Located in an area identified as having an affordable housing shortfall.
• Purchase price will be less than the development costs of building a comparable
property. Properties which cost more than this will be considered on a case-by-case
basis, e.g., if the property is highly adapted and meets the requirements of an applicant
with an accessible housing need. 
• Long term empty properties, where the purchase would allow for greater local amenity
and contribute to the Council’s statutory duties and strategic objectives. 
• The property will be able to achieve and be maintained to a standard acceptable to the
Council, e.g. to the SHQS and EESSH2/ SHNZS. 
• The purchase price is equal to, or a reduction of, the actual market value as assessed by
the Council’s valuation report/ Home report valuation. This will not prevent higher cost
projects from proceeding (including projects in regeneration areas, remote, rural and
island areas, and those involving housing for people with particular needs).
• Of standard construction only (due to the legal and cost implications they could incur if
otherwise).
Any decision to acquire a property is at the discretion of North Ayrshire Council and is subject
to the availability of relevant funding. If purchased, properties will be improved to meet the
Scottish Housing Quality Standard (SHQS) and the Energy Efficiency Standard for Social
Housing (EESSH2)/ Social Housing Net Zero Standard (SHNZS). 
310

Page 311

4 
2. Acquisition Programmes
Four acquisition programmes are currently being utilised in North Ayrshire. 
Strategic Housing Investment Plan  
The Strategic Housing Investment Programme 2026 to 2031 (SHIP) includes provision for 65
Council acquisitions between April 2024 and March 2031, as well as 37 acquisitions by
developing Registered Social Landlord (RSL) partners, subject to the availability of grant funding.
Both North Ayrshire Council’s and RSLs’ acquisition programmes aim to increase affordable
housing in the area, as well as contribute to wider regeneration and estate management. 
For more information, the Council’s Strategic Housing Investment Programme 2026 to 2031 can
be accessed online. 
Empty Homes & Second Homes
As at 1 April 2026, there are 582 empty homes subject to the Council Tax levy in North Ayrshire.
Additionally, there are approximately 1,300 second homes in North Ayrshire, the majority of
which are located on the islands of Arran and Cumbrae. The SHIP 2026 to 2031 makes provision
for empty and second home buy backs, with the Council’s Private Sector Advice Team providing
advice and assistance on empty homes.
Further information on the Council’s Private Sector Advice Team can be found on the Private
Sector Advice Service webpage.. 
Bringing former social housing stock into ownership can assist with housing management,
maintenance issues, and increase housing available through the North Ayrshire Housing
Register. Over the past five financial years the Council has acquired five empty homes, using
funding from the Affordable Housing Supply Programme, which have been brought back into use
as Council stock. 
A compulsory purchase order (CPO) can be made when we need to acquire land for purposes
that are in the public interest, where we cannot reach an agreement to acquire the land, or the
owner cannot be traced. A CPO may be used to bring empty homes back into use or to regenerate
an area. When we make a CPO, we must apply to the Scottish Government for confirmation of
the order.
Further information on CPOs in North Ayrshire can be found at Compulsory purchase orders
webpage.
Strategic Housing
Investment Plan 
Rural Affordable Homes
for Key Workers
Void and Acquisition
Fund
Estate Based
Regeneration Programme 
311

Page 312

5 
Adaptations
North Ayrshire Council may purchase properties for the use of specific applicant needs where no
suitable Council or RSL property exists and where the cost of purchasing the property would be
more cost effective than making adaptations and alterations to existing stock. Properties should
be purchased with vacant possession. 
North Ayrshire Council may consider purchasing private rented or owner-occupied properties
where the tenancy or ownership is at risk, and the property has been substantially adapted in a
major, permanent way to meet the needs of the tenant or household. The tenant or owner should
have a live North Ayrshire Housing Register application and there should be no suitable Council
or RSL property which meets the needs of the applicant (including consideration of the costs of
adapting existing stock).
“Off-the-shelf"
"Off-the-shelf" (OTS) property acquisitions in social housing refer to the purchase of already
completed new build/ or proposed, or newly refurbished properties from a developer or private
owner, ready for immediate occupation by social housing tenants. 
This approach is a strategic tool used by councils and housing associations, and, in the right
circumstances, can:
• Rapidly increase the supply of social homes and meet urgent local housing needs,
including reducing the use of costly temporary accommodation.
• Offer value for money compared to other housing delivery options.
Key considerations for OTS property acquisitions include development availability and timing, location
compared to where our need and demand assessments have identified, house type and layout
compared to our needs within that location, specification the developer will build to, cost per unit,
and future maintenance and estate management requirements. This is a new area under active
consideration by officers to identify any viable opportunities within North Ayrshire. 
Property Identification
There are a number of ways the Council identifies a pipeline of opportunities. This includes but
is not limited to:
• Officers regularly review properties that are for sale on the open market and have
established relationships with local estate agents who identify potential opportunities. 
• Direct contact has been made by owners interested in selling their properties to the
Council. Through the implementation of this strategy, a new process will be developed to
make it easier for owners to provide their property information. 
• The Private Sector Advice Team identify empty homes that meet the Council’s criteria for
acquisition and will actively contact owners to discuss their interest in bringing their
property back into use via the Council or and RSL purchasing the property. 
• Properties are identified by the Factoring Team where a block can be brought back into
full Council ownership.
Rural Affordable Homes for Key Workers
The Rural Affordable Homes for Key Workers Fund provides up to £25 million nationally through
to 2028 to help local authorities identify affordable homes for key workers in rural communities.
This funding is made available from the Affordable Housing Supply Programme and therefore is
312

Page 313

6 
only accessible to local authorities and RSLs. The fund focuses on making available underused
or empty properties for key workers and others in need. 
Much of North Ayrshire is classified as Accessible-Rural under the Scottish Government’s Urban
Rural 6-fold Classification, with the islands of Arran and Cumbrae classified as Remote Rural.
Key workers can include public sector and emergency service workers; however, the definition
of a key worker will be determined on an individual basis by local authorities according to their
local priorities. In North Ayrshire, the Arran Local Lettings Initiative provides an example of a
definition of key workers, taking a tiered approach.
For more information, please see the Housing Allocation Policy.
Guidance provided by the Scottish Government on the Rural Affordable Homes for Key Workers
Fund outlines that local authorities and RSLs can use the fund to purchase existing suitable
properties in rural areas, which can be rented directly or leased to employers to provide
affordable homes for key workers. This can include:
• Bringing empty properties back into use, or 
• Acquiring properties on the open market to increase the available supply of affordable
homes for key workers.
In line with the Scottish Government’s guidance, North Ayrshire Council will engage with a range
of organisations to develop proposals for use of the fund for consideration by the More Homes
Division, including:
• Public sector employers
• Key agencies, including Highlands and Islands Enterprise
• Local businesses, and 
• Registered Social Landlords
For more information, the guidance on the approach to the Rural Affordable Homes for Key
Workers can be found on the Scottish Government website. 
Properties acquired using the Rural Affordable Homes for Key Workers Fund are acquired in
addition to the properties outlined for acquisition in the SHIP 2026 to 2031. From 2023/24, seven
properties were acquired on Arran by Trust Housing Association using this funding stream. The
SHIP 2026 to 2031 highlights that there are no current projects being considered for the Rural
Affordable Homes for Key Workers in North Ayrshire beyond acquisitions being progressed by
Trust Housing Association. The Arran Housing Task Force will continue to work collaboratively to
identify and discuss potential opportunities to further use the fund to provide affordable housing
for key workers in rural areas, where appropriate.
Estate Based Regeneration Programme
In January 2019, the Council’s 10-year, £10 million Estate Based Regeneration Programme
(EBRP) was approved. The aim of the EBRP is to improve Council-owned housing estates across
North Ayrshire by addressing low demand stock, antisocial behaviour, external appearance,
parking provision, road and footpath condition, fencing, landscaping, and general grounds
maintenance issues. The Regeneration Team will acquire properties identified in the EBRP for the
purposes of:
• Demolition 
• Refurbishment
313

Page 314

7 
• Purchasing four-in-a-block flats where this would result in the Council’s majority
ownership in the block
The SHIP 2026 to 2031 includes for the provision of funding for 249 units to assist the delivery of
Housing’s Estate Based Regeneration Programme. This investment programme aims to provide
new homes to replace any stock which requires to be demolished or reconfigured as part of the
EBRP. As of 1 April 2026, a total of 17 properties have been acquired under the EBRP across North
Ayrshire in the areas of Ardrossan, Stevenston, Saltcoats, Irvine, and Kilwinning. 
Void and Acquisition Fund
The Homelessness Prevention and Strategy Group, co-chaired by Scottish Ministers and the
Convention of Scottish Local Authorities (COSLA), established the Temporary Accommodation
Task and Finish Group to advise on the short-term measures needed to address the increasing
use of temporary accommodation. Thereafter, the Scottish Government agreed to invest at least
£60 million through the Affordable Housing Supply Programme (AHSP) in 2023 to 2024 to support
a National Acquisition Programme. 
Building on the National Acquisition Programme, the Scottish Government announced in April
2024 that £80 million would be added to the Affordable Housing Supply Programme over 2024 to
2025 (£40 million) and 2025 to 2026 (£40 million). Resultantly, in September 2024, the Scottish
Government increased North Ayrshire Council’s 2024 to 2025 Resource Planning Assumption.
This uplift was to be directed towards:
• Acquisitions to help address temporary accommodation pressures, or 
• To bring long term voids back into use. 
Acquisitions were to be existing properties or new build properties off the shelf but were required
to be a permanent structure and available in perpetuity. In line with the guidance, any homes
purchased using this funding were allocated in line with the legal framework for allocations and
in accordance with North Ayrshire Council’s Allocation Policy. In September 2025, the Scottish
Government published its Housing Emergency Action Plan, which led to funding for the targeted
voids and acquisition fund increasing further. In 2024/25, one property was bought using this
fund and in 2025/26, four properties were bought using this fund.
For more information, further detail can be found on the Scottish Government website.
There is no specific funding for acquisitions announced for 2026/27 and beyond; this recognises
Scottish Government’s commitment to providing flexibility to local authorities to determine their
appropriate priorities between new builds and second-hand acquisitions. If any such fund
becomes available, North Ayrshire Council will engage with the Scottish Government and
stakeholders to make the most effective use of any funding that may become available for North
Ayrshire. 
3. Further Information
Budget
The Senior Manager (Housing Strategy & Development) is responsible for the Housing Revenue
Account Capital Budget to finance the purchase of private properties. The Team Manager
(Affordable Housing and Regeneration) will maintain a budget monitor for each funding stream.
314

Page 315

8 
Resources
This strategy will be supported and implemented by staff from Housing Services, Building
Services, Property Management & Investment, Legal Services, and Finance. 
Equal Opportunities
The provision of new social housing, including through housing acquisitions, will have a positive
impact on those who require specialist accommodation, older people, those who are homeless,
or at risk of homelessness, and those for whom purchasing a home is not an affordable option.
The benefits of new build housing in relation to health, wellbeing, and educational attainment are
well documented. New housing will also support our island communities and their economies.
A reduction in new build completions will have a negative impact on these groups.
Review
This strategy will be reviewed on an annual basis in line with the Strategic Housing Investment
Plan, or on such a basis as is required to ensure the accuracy of all criteria and funding
information.  
315

Page 316

9 
Comments and views about any aspect of this
document are welcomed. We also take the
opportunity to encourage local people to
become involved in the planning and delivery of
housing solutions. To get in touch, please
contact: 
Local Housing Strategy
North Ayrshire Council
Housing & Public Protection
FREEPOST SCO2742
Irvine 
KA12 8BRT: 
Developmentandstrategy@north-ayrshire.gov.uk 
This document is available in other formats
such as audio tape, CD, Braille, large print, and
other languages on request. 
316

Page 317

Version: 7.0
North Ayrshire Council
Equality & Children’s Rights Impact Assessment
(Screening Form)
Please Note: Before you begin, is this version the most up to date?  You can
download the most recent version on Connects. Screenings and ECRIAs should be
included with relevant Committee Reports and may be published on our website.
This screening form encompasses key pieces of legislation which the Council needs to
assess its activities against. This form should assist in deciding whether a full impact
assessment is required.
• The Public Sector Equality Duty requires that we demonstrate that we are making
decisions in a fair, transparent and accountable way. The Council must show that it
has considered the needs and rights of people with protected characteristics.
• Where decisions affect young people, we must consider the ‘Rights of the Child’,
under the United Nations Convention on the Rights of the Child (UNCRC).
• We must consider the Socio-Economic Impact under the Fairer Scotland Duty. 
• We need to consider whether any of our Islands may be impacted differently from
the mainland under the Island’s Act.
• We also need to consider whether ‘consumers’ of our Services will be impacted
under the Consumer Duty.
The various duties require the Council to assess the ‘impact’ of proposals thoroughly
before any decisions are taken. This should be proportionate to the decision that is being
made and should be carried out as early as possible in the process. It can then be
repeated as the policy/proposal is progressed. Further Guidance on carrying out an
impact assessment can be found in our Equalities pages on Connects.
1. Proposal
Title: Housing Acquisition Strategy
Budget reference number and heading if appropriate (or not applicable):
n/a
Amount (£) of saving if appropriate (or not applicable): 
n/a
Service: Housing and Communities
Lead officer: Fiona Ellis
List of participants in the assessment: n/a
Date completed: 13/04/2026
317

Page 318

Version: 7.0
2. What are the main aims of the proposal?
The aim of this strategy is to increase the availability of permanent homes
to meet the affordable housing need and demand in North Ayrshire.  
The proposed North Ayrshire Housing Acquisition Strategy will support the following
Local Housing Strategy (LHS) actions:
• Deliver 1,666 new units of social housing
• Consider opportunities to provide homes in and around our town centres
• Support the Scottish Government's target to deliver 110,000 new
affordable homes by 2032 by delivering the projects set out within the
Strategic Housing Investment Plan
• Increase the social housing supply by buying back former social housing
• Bring empty homes back into use through the buyback scheme
• Ensure that the Strategic Housing Investment Plan addresses current and
future demographic needs. 
The Housing Acquisition Strategy will contribute to the Strategic Housing Investment
Plan (SHIP), helping to achieve the Council Plan priorities and strategic aims by:
• Through our housebuilding programme and wider housing investment,
providing homes for life that meet the needs of our residents
• Increasing the number of homes in the area through a mix of private
and social developments and bringing empty buildings back in to use
• Ensuring our places and spaces where we live, work and visit are well
maintained and accessible
• Reducing the carbon footprint of our estate through rationalisation
utilising a locality-based approach and taking a fabric first and low
carbon energy generation approach to homes and buildings
3. What data, research or other evidence was used for this
screening?
The function of buy backs/acquisitions has been ongoing for a number of years and
included as part of the Local Housing Strategy (LHS). The only change is the
creation of a standalone strategy. 
4. Screening questions
Does the proposal affect service users, employees or the wider community –
particularly services that are known to be important to protected groups?
Please delete whichever statement is not applicable from the text below:
Yes, the proposal does affect service users, employees or the wider community and
specifically to services that are known to being important to particular protected
groups.
318

Page 319

Version: 7.0
Is it a major proposal, significantly affecting how services are delivered or how
other organisations operate?
Please delete whichever statement is not applicable from the text below:
No, it is not a major proposal, significantly affecting how services are delivered or
how other organisations operate.
Does it relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes? 
Please delete whichever statement is not applicable from the text below:
Yes, it does relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes.
319

Page 320

Version: 7.0   
5. Impact
Are there any impacts on the following groups?
Age (young/old people); Disability (physical and learning disabilities); Gender Re-
assignment; Pregnancy and Maternity; Race and Ethnic Origin; Religion or Belief;
Sex; Sexual Orientation; Marriage and Civil Partnership; Care Experienced; Fairer
Scotland Duty; Human Rights; Other (Homelessness, rural, carers, part-time
workers, etc)
Yes – The provision of new social housing, has a positive impact on those who
require specialist accommodation, older people, those who are homeless, or at risk
of homelessness, and those for whom purchasing a home is not an affordable
option.  The benefits of new build housing in relation to health, wellbeing, and
educational attainment are well documented. New housing also supports
our island communities and their economies. 
If yes or unsure, you should consider carrying out a full impact assessment.
Click or tap here to enter text.
6. The Fairer Scotland Duty – (reducing the socio-economic
impact of our policies, strategies and budget decisions)
Does the proposal have any negative (or potential) positive impacts
that need to be explored in more detail? (Please provide a brief
summary)
The Housing Acquisition Strategy has a positive impact by aiming to increase the
availability of permanent homes to meet the affordable housing need and
demand in North Ayrshire.  
Low income/poverty – the Housing Acquisition Strategy does not include any
proposals to assist people who cannot afford to maintain regular payments
such as bills, food, and clothing. However, any person that benefited from a
tenancy in a home that was purchased under the scheme would have access to
assistance / support as a social housing tenant.
Low/no wealth - The Housing Acquisition Strategy has the potential to have
positive impacts on people who have low incomes and low wealth, e.g., through
provision of increased volume of good quality affordable homes.  
Material deprivation – Through increased social/affordable housing stock, we
would be able to help more of our residents affected by material deprivation
through an increased number of good quality, affordable homes.     
320

Page 321

Version: 7.0   
7. Children’s Rights (UNCRC)
Does the proposal have any impact in relation to the UNCRC articles for
Children’s Rights?
Yes – the Housing Acquisitions Strategy would have a positive impact on Article
27 whereby more children would have access to safe and well-maintained
housing through an increase in the availability of permanent homes to meet the
affordable housing need and demand in North Ayrshire.
8. Island Proofing
Are there any special considerations for the island communities
within North Ayrshire?
Whilst the strategy covers the whole of North Ayrshire, it is fully recognised that
delivering homes on islands can be more complex and expensive than on the
mainland.  Whilst the strategy itself doesn’t specify any special considerations
for our island communities, there is a focus on them through the working
process.  NAC Housing services work closely with the Registered Social
Landlords (RSLs) on our islands and provide support where required.  This can
include supporting applications to the Scottish Government for additional
funding to help the RSL make a housing acquisition where property prices are
higher than they would be on the mainland.   
9. Consumer Duty
Is your proposal a decision that will impact on consumers? (The
definition of consumer is ‘an individual or a small business that
purchases, uses or receives goods or services in Scotland, that are
supplied either by a business or a public body’.  Please see What is
the Consumer Duty for more details) 
Yes - Acquiring housing and bringing it up the standards required helps to
improve overall housing condition, increases social/affordable housing stock and
helps to bridge some of the gap between supply and demand in relation to new
build programmes.  The acquisition of housing can further assist our island and
rural communities through additional provision of affordable housing for e.g. key
workers in areas where there is identified need.  Housing acquisitions are also
usually quicker to complete sales on and for a lower cost than that of new build
housing.  This in turn means that through property acquisitions our consumers
e.g. those on the Common Housing Register, will be positively impacted through
increased stock/in turn improving chances of getting a new affordable home. 
321

Page 322

Version: 7.0   
10. Have any cross-cutting impacts been identified from other
Council Services or Partner Agencies (such as discrimination
across multiple groups or accumulated effects of multiple
proposals on a single group)?
no 
11. Has there been any engagement or consultation on the
proposal with any groups, services or partner organisations
that could help inform the impact assessment?
n/a
12. What are the monitoring and review arrangements?
This strategy will be reviewed on an annual basis in line with the
Strategic Housing Investment Plan, or on such a basis as is required to ensure
the accuracy of all criteria and funding information. 
13. Considering this Equality Screening in its entirety, what is your
recommended next step? (Please explain your decision.)
Screening Only no further assessment is required.  (Your explanation must
include how this decision will be monitored and reviewed as the policy /
decision is implemented.) 
No further assessment required.  This strategy will be reviewed on an annual
basis in line with the Strategic Housing Investment Plan, or on such a
basis as is required to ensure the accuracy of all criteria and funding
information.  
14. Authorisation
Policy Lead/Manager: Click or tap here to enter text.
Date: Click or tap to enter a date.
Head of Service: Click or tap here to enter text.
Date: Click or tap to enter a date.
322

Page 323

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Ardrossan Campus – Project Update 
Purpose:  To provide Cabinet with an update on the current progress of
the Ardrossan Campus project, including current projections in
relation to costs and programme. 
Recommendation:  Cabinet is asked to:
1. Note the content of this report, including the current progress
of work on site. 
2. Note the revised project completion date of 26 May 2028,
with anticipated occupation from August 2028. 
3. Note the additional estimated cost of £9.97 million (8.74%)
associated with addressing the contamination will be met
from approved capital flexibility funding. 
1. Executive Summary 
1.1 The Ardrossan Coastal Quarter programme represents a transformational vision for
the area which includes the provision of new housing and commercial uses, providing
ambitious transformational regeneration of a vacant and derelict site on land within
one of North Ayrshire’s most deprived communities. A key component of this vision is
a new educational and community campus. 
1.2 The contract to construct the new Ardrossan Campus Project commenced on site in
July 2025, with the first stage focusing on the excavation of foundations and the
swimming pool tank. In September 2025, asbestos and hydrocarbon contamination
was identified during construction. Appropriate Safe Systems of Work were then
implemented by the main contractor (Morgan Sindall), with an independent review
confirming these measures to be proportionate and compliant. 
1.3 The contractual and programme implications were subsequently assessed by our cost
consultant, resulting in an additional cost of £9.97 million (8.74%) and an extension of
the completion date to 26 May 2028. 
1.4 The overall Campus project budget will therefore increase to £124,558,600, with the
additional funding to be met from the Council’s capital flexibility fund approved in
February 2026. 
Agenda Item 17
323

Page 324

1.5 An independent external review of the enabling works has been commissioned, with
an initial assessment received and currently under consideration. 
1.6 The safe systems of work which have been required since encountering the
contamination have now ceased. Works are progressing unhindered by these
additional measures and the project has now reached a significant milestone on the
construction process as steel work is now rapidly being erected on-site. 
1.7 Stakeholder engagement will now be undertaken to communicate the revised delivery
arrangements and support appropriate mitigation of the impacts arising from the
extended programme. 
2. Background 
2.1 Two separate contracts relating to the delivery of the Ardrossan Coastal Quarter
were undertaken commencing in June 2023 and January 2024 respectively. The
purpose of these projects was to deliver a new revetment (Sea-Wall) coastal
defence, an extension of the coastal path, remediate contamination and to install
site-wide infrastructure to enable future development. 
2.2 Remediation strategy involved treating contaminated soil on location, removing
hydrocarbons, and reusing suitable treated material in the works. The strategy also
included installing 600mm stone cap across the site to provide a protective barrier as
all contamination would not be removed. The remediation was independently
monitored and verified to ensure it met all required standards. 
2.3 Subsequent to that, construction work on the new Ardrossan Campus commenced in
July 2025, with initial works focusing on the formation of foundations and excavation
of the swimming pool. 
2.4 As works progressed on site, an in accordance with the agreed methodology for
progressing the works, testing of excavated materials continued in order to ensure
all health and safety standards were maintained. In September 2025, asbestos and
hydrocarbon contamination was identified as a result of that testing. Appropriate
Safe Systems of Work were immediately implemented by the main contractor
(Morgan Sindall), with an independent review confirming these measures to be
proportionate and compliant
Programme Development
2.5 The Ardrossan Coastal Quarter site was selected in 2018-2019 as the preferred
location for the new Campus, reflecting its capacity, regeneration potential, and
alignment with the Council’s Local Development Plan priorities. The wider vision
includes residential and commercial development to support regeneration and align
with the Local Development Plan.
2.6 The “Ardrossan North Shore Development Framework”, prepared by external
consultants (Stallan Brand), was approved in April 2021 and set the strategic context
for redevelopment. Subsequently, In June 2021, the Council agreed remediation and
324

Page 325

site infrastructure works to achieve economies of scale and improve the site’s
attractiveness for future investment. 
2.7 In the prevailing market conditions, a single contract for the complete programme of
work was not considered the most deliverable option, and the chosen approach
provided a practical route to securing progress. Market feedback indicated that
including the Campus within those packages would have been less attractive to
bidders. This was reaffirmed when the subsequent Campus tender process only
attracted two bids.
2.8 Following market engagement on the enabling works tender issued in November
2021, the procurement approach was refined in response to no compliant bids being
received through the original process, with the works restructured into two packages
and successfully retendered in 2023 and 2024. 
2.9 Due to the phasing of the separate projects, the enabling works were more
advanced than the Campus design, and the revetment had to be completed first. In
the context of a volatile market, maintaining separate elements of delivery helped
support programme progress and provided a more manageable basis for pricing. 
2.10 It should be noted that the enabling works, as separate contracts with different
contractors, were not the first stage of the construction contract to deliver the
Campus. These were discrete pieces of work, intended to enable development
across the wider Ardrossan Coastal Quarter site. Although the advance enabling and
remediation works provided an appropriate and proactive route to delivery, the use
of three separate contracts meant that interface risks were recorded and remained
an inherent feature of the overall programme.
2.11 The Campus design was successfully finalised while the advance works were
progressing, with the projects coordinated to support overall delivery. Although the
advance works project was not intended to deliver Campus construction works, this
approach helped maintain progress, while market feedback confirmed that separate
contractual responsibilities remained the more practical route. 
2.12 Recognising the challenges being experienced in delivering the wider programme of
works, with a focus on ensuring the Campus could be delivered as soon as possible,
a review was conducted with the support of external consultants (Ironside Farrar) in
February 2024. This confirmed the inherent risks of brownfield remediation, buried
structures, coastal conditions and sequential working, with further contamination
assessed at that stage as an amber risk.
2.13 As Morgan Sindall had no control over the enabling works contract, it confirmed prior
to Financial Close that it would not accept contamination risk within the Campus
contract, the contract therefore acknowledged this risk and relied on the contingency
allocation to address any arising issues. 
2.14 A report was submitted to Council on 26 June 25, confirming the revised budget and
programme for the project. A number of key remaining risks were also highlighted in
the report. Included within those was the potential to discover contaminated material
325

Page 326

in the deep excavations below the remediated level, and the impact this could have
on costs and programme. 
2.15 To estimate the potential cost, prior to entering the construction contract the
assessment associated with this risk estimated that around 13,280m³ of excavation
would extend below the 3.5m remediation depth. Utilising market rates for disposal,
a potential worst case disposal exposure of £6.64m was assessed. Because overlap
between known contamination and deep excavations appeared limited, an overall £5
million contingency was considered realistic and included within the project budget. 
2.16 The Scottish Futures Trust (SFT) have worked in partnership with the Council
throughout the development phases of the project, including providing financial
support thought the Scottish Government’s Learning Estate Investment Programme.
The project allocation was increased to reflect the challenging conditions around the
delivery of the project. 
2.17 Verification reports in respect of the enabling works contract were received,
satisfying the Planning Conditions required to allow works to commence on site. 
Campus Construction Phase 
2.18 In September 2025, asbestos and hydrocarbon contamination was encountered
during deep excavations. Elected Members and the local community were
proactively informed shortly thereafter. 
2.19 As a result of this, and to ensure works could progress in a safe manner, Morgan
Sindall introduced Safe Systems of Work, including exclusion zones and specialist
controls. 
2.20 An external specialist engineering advisor independently reviewed the Safe Systems
of Work on the Council’s behalf and found them to be both proportionate and
compliant. 
2.21 Our cost consultants, Atkins Realis, have assessed the contractual impact of the
appropriate treatment of the contaminants via the safe system of work as an
additional £9.97 million. The programme impact has also resulted in an extension of
time to the contract to 26 May 2028. This has been formally confirmed through the
contractual change control process. 
2.22 This figure represents a significant betterment than the original proposal by the
contractor following robust review and challenge by the Campus project team and
external advisors. 
2.23 Addressing the contamination issue will result in the Campus project budget rising to
£124,558,600. This increase will be addressed through the Council’s capital flexibility
fund approved by Council in February 2026. 
2.24 A report by independent specialist engineers has been commissioned, with input
from the appropriate consultant teams, to ensure the reasons for the current issues
are properly understood. An initial assessment has been provided and is being
reviewed to determine the next steps. 
326

Page 327

2.25 Separate delivery of the enabling works and the Campus has also required ongoing
management of wider interface risks; however, these matters are being actively
managed through cross-service coordination to ensure that appropriate mitigation
measures are identified and allocated. 
2.26 Under the NEC4 contract, the Council’s exposure to additional cost arising from
systemic supply chain issues arising from the current conflict in the Middle East is
limited, with broader liability arising mainly where contract terms or future legislative
changes require it.
2.27 As the cost and programme implications arising from encountering contamination are
now understood, the overall construction programme has been updated, and the
Project Team will undertake stakeholder engagement to advise on the new
timetable. This engagement will include: elected members; the school community;
neighbours and the Ardrossan community; and Scottish Futures Trust. 
2.28 The negative impacts of the delay will be most keenly felt by the by the school
community being unable to access the new facility when planned and the
neighbouring properties experiencing direct disruption caused by construction
activities. 
2.29 Stakeholder engagement will recognise these negative impacts, and the project team
will continue to explore practical mitigations to the issues posed by the extended
programme. 
2.30 With the safe systems of work around contamination removal now being complete,
works are progressing unhindered by these additional measures and the project has
now reached a significant milestone on the construction process as steel work is now
rapidly being erected on-site and concrete floor slabs are being poured. 
3. Proposals 
3.1 It is proposed that Cabinet:
• Notes the content of this report, including the current progress of works on site.
• Notes the revised completion date of 26 May 2028, with anticipated occupation from
August 2028. 
• Notes the additional estimated cost of £9.97 million (8.74%) associated with
addressing the contamination will be met from approved capital flexibility and
borrowing. 
4. Implications/Socio-economic Duty 
Financial 
4.1 An additional £9.97 million (8.74%) has been identified as necessary to address the
contamination issues associated with Compensation Events relating to the
contamination as outlined in this report. This requirement will be met through the
approved capital flexibility budget agreed by Council on 25 February 2026. 
327

Page 328

It is anticipated that additional contingency funding may be required to address any
remaining risks which arise during the remainder of the construction period. 
In parallel, a further review of the Council’s Capital Investment Programme will be
undertaken covering the period 2026/27 to 2033/34, to ensure that the revised
programme remains prudent, affordable and sustainable. This review will include long-
term projections of borrowing and interest rate assumptions, assessment of
expenditure profiles, capital receipt forecasts, anticipated capital grant funding, and
the planned use of the loans fund reserve. 
Scottish Futures Trust has been approached to explore whether any additional
support may be available. However, the Scottish Government has confirmed, that in
accordance with the agreed LEIP funding principles, the inflationary risk associated
with project delays rests with the local authority. 
Human Resources 
4.2 None 
Legal 
4.3 Legal Services will be asked to comment on the report noted at item 2.24. 
Equality/Socio-economic 
4.4 The construction of the new Campus, as a key component of the wider
transformational regeneration of the Ardrossan Coastal Quarter will have significant
direct and wider socio-economic benefits. 
Climate Change and Carbon 
4.5 Ardrossan Campus has been designed to be highly energy-efficient and to meet the
LEIP in-use energy requirements of between 67-83KWh/m²/annum. The contract
design shows a predicted attainment of 71KWh/m²/annum. A sustainability
responsibility matrix has been developed and incorporated into the contractual
agreement to deliver facilities that will contribute to the Council’s climate change
priorities. 
Key Priorities 
4.6 The project supports the following Council priorities: 
Wellbeing 
• Developing appropriate skills for the local and regional economy 
• Using our assets to support wellbeing in local communities Improving educational
attainment and achievement and closing the attainment gap 
• Developing the young workforce and ensuring positive destinations for school
leavers 
• Providing lifelong learning opportunities for individuals and organisations including
digital literacy 
328

Page 329

• Improving outcomes for care-experienced young people including implementation
of The Promise 
• Ensure our places and spaces where we live, work and visit are well maintained
and accessible. 
• Support KA Leisure’s leadership of North Ayrshire’s Health and Wellbeing Alliance 
• Through the Health and Social Care Partnership Strategic Plan we will protect and
provide care and support for those in need. 
Communities and Local Democracy 
• Developing partnerships with the third and voluntary sector 
• Placemaking, including creation of locality action plans. 
• Accessible public services, both digitally and locally. 
Climate Change 
• Embedding our net-zero ambition in all democratic decision-making. 
• Reducing the carbon footprint of our estate and taking a fabric first and low carbon
energy generation approach to homes and buildings 
• Promoting new woodland creation and protecting our green spaces to provide a
natural resource for carbon sequestration. 
Community Wealth Building 
4.7 A suite of community benefits has been developed through the design and
construction phases of the project. The commitments from Morgan Sindall which are
defined in the SCAPE framework agreement have been incorporated into the
contractual requirements for the project. 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 The development of the Campus fully supports these rights. 
Consumer Duty 
4.10 The project will deliver on these through the Stakeholder Reference Group and Client
Planning workstreams. 
5. Consultation 
5.1 Consultation has been undertaken with Education, Economic Development Growth &
Regeneration, and Finance. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Laurence Cree, Head of Service Sustainability,
Transport & Corporate Property, on 01292 324514. 
329

Page 330

Background Papers
0 
330

Page 331

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Ayrshire Growth Deal: International Marine Science and
Environment Progress (IMSE) Update 
Purpose:  To provide an update on progress on the International Marine
Science and Environment project, to seek approval for the
strategic direction and to note the development of a
Collaboration Agreement with partners Field Studies Council
and Community of Arran Seabed Trust to support the further
development of the project. 
Recommendation:  That Cabinet: 
a) Notes the progress to date and approves the strategic
direction for the International Marine Science and
Environment project;
b) Notes the development of a Collaboration Agreement with
the Field Studies Council and the Community of Arran
Seabed Trust to progress the project and develop the full
business case; and
c) Notes the progression of the change management
requirements and Outline Business Case for the project,
informed by feedback from the Scottish and UK
Governments. 
1. Executive Summary 
1.1 The International Marine Science and Environment project forms part of the Ayrshire
Growth Deal with an initial commitment of £10.5m investment towards marine
research, education and industry collaboration. This forms part of the wider £251m
investment under the Ayrshire Growth Deal which is a partnership between the UK
and Scottish Governments and the three Ayrshire Authorities. 
1.2 The report provides an update on the progress on the International Marine Science
and Environment project, which has evolved towards a partnership-led, networked
model, maximising outputs and outcomes through collaboration with established
delivery partners, the Field Studies Council and the Community of Arran Seabed
Trust. It seeks approval for the strategic direction and notes the development of a
Collaboration Agreement with the project partners and the draft Outline Business
Case, subject to feedback from the UK and Scottish Governments.
Agenda Item 18
331

Page 332

2. Background 
2.1 Through the £251m Ayrshire Growth Deal (AGD) investment programme, the UK
Government provided a commitment of £6.5m matched by £4m from North Ayrshire
Council to the International Marine Science and Environment project. This was
through the Energy, Circular Economy and Environment Programme which seeks to
unlock the benefits of developing low carbon energy technologies and solutions. 
2.2 The project aimed to create a world-class centre of excellence to drive innovation in
marine science and establish the Firth of Clyde as an exemplar of marine
sustainability in Scotland’s blue economy. It was originally envisaged that this would
include a flagship building at Ardrossan’s Coastal Quarter managed by a single
University with dedicated staff to promote entrepreneurship and innovation projects
with emerging and established businesses. 
2.3 Since 2020, North Ayrshire Council has explored opportunities to develop a blue
economy innovation programme and associated collaboration opportunities. A pathway
finder analysis report prepared by the University of Stirling in 2021, identified the
potential for a nationally and globally significant blue economy innovation programme. 
2.4 Cabinet approved a timebound Collaborative Agreement with the University of Stirling
and FSC for two years in February 2024. This sought to achieve the submission of an
outline business case to UK and Scottish Government, create a plan of works required
for the creation of the full business case, or phased full business cases, and
corresponding procurement works. Following the sad loss of Dr John Rogers, the
Executive Director of Research, Innovation and Business Engagement, it was
established that the University was no longer in a position to progress with its
anticipated role in project. 
2.5 To advance the concept of the programme and to support the development of a
business case further collaboration has progressed between the Council, Field
Studies Council (FSC) on Cumbrae and Community of Arran Seabed Trust (COAST)
on Arran. This has strengthened the opportunity, providing a cost-effective, lower-risk
delivery route building on existing infrastructure and expertise. This has recognised
that enhancing the existing offering at both locations and forging strong partnerships
could significantly contribute to marine science, and blue economy research,
development, and innovation in the region. 
2.6 Through a programme deliverability review led by the AGD’s Programme
Management Office (PMO), the allocations under the Energy, Circular Economy and
Environment Programme were reviewed to ensure that the identified projects could
achieve their scope and intended outcomes. Further engagement with the UK and
Scottish Governments provisionally confirmed a reapportionment under this
programme increasing IMSE’s UK Government allocation to £11.275m. The formal
approval of this is subject to the submission and approval of the change management
requirements and Business Case. This requires to be progressed through the Ayrshire
Growth Deal’s governance processes. 
2.7 The collaboration with FSC and COAST is being formalised through a Collaboration
Agreement to develop and maintain a partnership supporting the delivery of the IMSE
332

Page 333

project and business case progression. The partnership will undertake further work to
refine interventions including: 
• Research and analysis;
• Concept design and infrastructure options;
• Development of innovation and challenge-led programmes; and
• Long and shortlisting in line with HM Treasury Green Book requirements. 
2.8 The partners have agreed to contribute up to a maximum of £50,000 to support the
work required by this agreement with roles defined as follows: 
Partner Role(s)
North Ayrshire
Council
Senior Responsible Officer (SRO)
Project Management and Project Management Office Liaison
AGD reporting to Scottish and UK Government
Funder
Business Case development
Growth Deals link (Ayrshire Growth Deal)
Field Studies
Council
Site Operator expertise
Landowner
Academic, innovation and enterprise expertise
Business Case development
Island community engagement on Cumbrae
Community of
Arran Seabed
Trust
Academic, innovation and enterprise expertise 
Business Case development
Island community engagement on Arran 
2.9 Significant progress has been made in advancing the vision, with a strong emphasis
on collaborative planning and strategic alignment with the partners. The project is
being designed to harness the combined strengths of industry, academia, and
environmental organisations. Efforts have concentrated on the co-design of detailed
plans with stakeholders, laying the groundwork for a transformative project that will
drive forward marine science, technology and sustainability. 
2.10 The Outline Business Case (OBC) is being developed in partnership with FSC and
COAST. The proposed approach aligns with national and regional policy priorities and
responds to market failures in the Ayrshire marine sector, where significant economic
potential remains underdeveloped. It positions the region’s marine environment as an
undercapitalised asset and proposes a coordinated cluster linking research
institutions, businesses and communities and offering longer term sustainability. 
2.11 The IMSE project will focus on applied sciences and bring together research and
innovation activities alongside work undertaken by the partners. The project will
support investment in these facilities to strengthen collaborations with universities and
research organisations. These organisations already support significant grant-funded
research and provide a strong foundation for future growth. By fostering collaboration
and investment, the IMSE project will address the current lack of a definable research
hub and limited cross-sectoral working. 
2.12 The preferred option for the project is a networked hub model building on and
enhancing existing assets and the marine science activities delivered at FSC in
Millport and COAST in Lamlash. This offers the best value approach, managing risk
333

Page 334

while maximising impact. It is anticipated that this approach will deliver strong long-
term value, with benefits significantly outweighing costs and building on existing
research capacity. 
2.13 The IMSE project aims to: 
• Develop a long-term partnership with Scotland’s Universities, the Scottish
Association for Marine Science, Marine Alliance for Science and Technology for
Scotland.
• Grow the number of universities that collaborate with FSC and COAST and use
the facilities at Millport Field Studies Centre and COAST in Lamlash from across
Scotland, the UK and internationally.
• Provide employment and training opportunities for communities and attract
professionals to train, develop new industries and encourage innovation and
investment in Ayrshire.
• Provide educational and vocational training opportunities in partnership with
Glasgow university, other university partners and Ayrshire College as well as
attracting schools from across Scotland.
• Further develop the islands as visitor attractions, build links with the Marine
Tourism project and use existing and new tourist operations to showcase the
island’s research and innovation activities and natural heritage.
• Extend the tourism offer and the average length of stay on Cumbrae by
developing a marine, nature-based and heritage visitor attraction. Longer term
there is an ambition to host training events for working in the blue economy and
tourism sector. 
2.14 Delivery will build on established partner capacity, ensuring confidence and reducing
delivery risk. Procurement will follow established processes, with risks relating to
contractor availability and compliance with subsidy control requirements identified and
managed. The project is affordable within the revised AGD allocation, supporting
investment in infrastructure such as laboratories, accommodation and monitoring
equipment. It is anticipated that the project will deliver significant long-term monetised
and non-monetised benefits, including increased investment in the blue economy, job
creation, reputational gains and improved ecosystem health, building on existing
research activities. 
2.15 The formal approval of the reapportionment of funding under the Energy, Circular
Economy and Environment Programme to IMSE will be progressed through the
Ayrshire Growth Deal’s governance processes. The draft OBC will be updated
informed by feedback from the UK and Scottish Government. Thereafter the final OBC
will be formally submitted to UK and Scottish Government and create a plan of works
required for the creation of the Full Business Case (FBC), or phased FBCs and
corresponding procurement works. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the progress to date and approves the strategic direction for the
International Marine Science and Environment project;
334

Page 335

b) Notes the development of a Collaboration Agreement with the Field Studies
Council and the Community of Arran Seabed Trust to progress the project and
develop the full business case; and
c) Notes the progression of the change management requirements and Outline
Business Case for the project, informed by feedback from the Scottish and UK
Governments. 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications associated with the Collaboration Agreement.
Project development activity related to the proposals may require advance funding
through the Ayrshire Growth Deal, as allocated within approved capital budgets.   
Human Resources 
4.2 None. 
Legal 
4.3 The Collaboration Agreement partnership with the Field Studies Council and
Community of Arran Seabed Trust, has been developed with support from Legal
Services. The draft Outline Business Case has been developed in line with
Government Green Book guidance and subsidy control requirements. 
Equality/Socio-economic 
4.4 An Equality and Children’s Rights Impact Assessment will be undertaken for the project. 
Climate Change and Carbon 
4.5 The ambitions of the project align with the adopted Sustainable North Ayrshire
Strategy. Any statutory requirements related to environmental impact will be
undertaken during the project’s development. In addition, the Ayrshire Growth Deal
business case requirements include carbon scoring and measures to mitigate and
carbon increases. 
Key Priorities 
4.6 The project will contribute to achieving Council Plan priorities and the vision and
priorities of the Ayrshire Regional Economic Strategy. 
Community Wealth Building 
4.7 The project will contribute to the Council’s Community Wealth Building ambitions by
supporting the use of land and assets, supporting job creation and skills and
employability opportunities, supporting investment in North Ayrshire, supporting a just
transition to net zero and securing anchor institutions within North Ayrshire. 
335

Page 336

Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Business Case has been developed and informed by engagement with sector
leads from and academia, private and public sector stakeholders. Wider stakeholder
and community engagement will be undertaken to inform the next phase of the
project’s development. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Bruce McClure, Senior Manager, Growth &
Investment on brucemcclure@north-ayrshire.gov.uk. 
Background Papers
Cabinet Report, 20 February 2024: International Marine Science & Environment (IMSE)
Ayrshire Growth Deal project - Collaboration Agreement   
336

Page 337

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Flexible Advanced Manufacturing Space, i3 Irvine: 
Phase 2, Full Business Case 
Purpose:  To seek endorsement of the Full Business Case for Phase 2 of
the Flexible Advanced Manufacturing Space Project at i3, Irvine. 
Recommendation:  That Cabinet agrees to: 
(a) Endorse the Full Business Case for Phase 2 of the Flexible
Advanced Manufacturing Space project at i3, subject to
feedback from Scottish and UK Governments and the
successful outcome of the tender process;
(b) Delegate authority to the Executive Director (Place) to
update the Full Business Case to reflect the feedback and
outcome of the tender process; and
(c) Approve the submission of the Full Business Case to the
Ayrshire Economic Joint Committee. 
1. Executive Summary 
1.1 The i3 Flexible Advanced Manufacturing Space (flexible space) project is one of two
projects located at i3 Riverside Business Park in Irvine that is benefitting from an
overall investment of over £22M through the Ayrshire Growth Deal. i3 is one of North
Ayrshire’s key strategic sites, designated as an Enterprise Area in 2012 to attract life
science companies. 
1.2 The project is part of a wider programme of new employment space across Ayrshire
funded by £69.5M from the AGD, supporting economic infrastructure and engineering
and manufacturing sectors and through the Local Regeneration Fund that is delivering
additional floorspace in Irvine at Annickbank Innovation Campus on the edge of i3,
and at Kyle Road. The overall aim is to meet an identified demand for modern
business space where there has been a longstanding issue of market failure, to help
grow local businesses and to attract inward investment. Additional funding has also
been secured via the £17.4M award for the Levelling Up for Ayrshire: Commercial and
Low Carbon Infrastructure project from the Local Regeneration Fund, formerly the
Levelling Up Fund. 
1.3 Cabinet previously agreed to support the delivery of Phase One, with the approval of
the Full Business Case on 29 November 2022 and approval of the related lease on 2
Agenda Item 19
337

Page 338

December 2025. The location of AGD flexible space investment is now focussed
entirely on a cluster entirely at Riverside Way informed by increased construction
costs, market demand and the successful marketing of the Strategic Investment
Campus site for inward investment. 
1.4 The draft Full Business Case provided at Appendix One is under review by the
Scottish and UK Governments. The tender for the design and build contract works has
been published, with receipt of tenders expected in July 2026. Subject to the selection
of a preferred bidder within the available budget, it is intended that the contract will be
awarded following feedback from Governments and any required adjustments, final
endorsement by Cabinet and the approval of the FBC by the Ayrshire Economic Joint
Committee (AEJC). 
2. Background 
2.1 The Ayrshire Growth Deal (AGD) investment in the flexible space project comprises of
£11M from Scottish Government and £4M from North Ayrshire Council, plus additional
funds leveraged from the Local Regeneration Fund (LRF), formerly Levelling Up Fund
(LUF) of £4.706M, and the Vacant and Derelict Land Fund (VDLF) of £0.967M, to help
create commercial space in a variety of formats and over a series of phases. 
2.2 The i3 Flexible Space project is focussed on investing in new business space in a
variety of formats, including large units capable of sub-division and small terraced
units for business start-ups or research and development. The project will help
address the following issues: 
• High local demand for industrial space.
• Low vacancy rates for industrial space of less than 1% for Irvine, 2.4% for North
Ayrshire and 4.4% for West of Scotland (amongst the lowest in the UK).
• Insufficient rental values to support financially viable new-build speculative
development.
• Very limited funding sources available for the public sector to intervene.
• Constraints on indigenous companies seeking to grow and expand within North
Ayrshire.
• Constraints on attracting inward investment through lack of modern premises.
• The need to grow the local economy through adapting to modern industrial
processes linked to Life Science, Advanced Manufacturing and other sectors.
• Ageing stock of existing industrial premises that is facing obsolescence.
• Constraints due to companies being less accessible to disabled or mobility
impaired job seekers / trainees.
• Growing pressure through changes in legislation and customer demand, to create
better configured, more energy efficient building stock and eliminate hazardous
building materials. 
2.3 Phase One of the project involved the construction of an 18,180 square foot (1,690
m2) light industrial unit on a 2.7 acres site with an adjoining yard and parking spaces.
The unit, which is capable of subdivision or extension, benefits from dedicated parking
including EV charging infrastructure, low energy LED lighting, roof mounted
photovoltaic panels and full fibre connectivity. A topping out event was held on 17
February 2026 to celebrate the completion of the project. The property has been
leased through a successful marketing campaign with the tenant, Barony Universal,
now in occupation. 
338

Page 339

2.4 Phase Two will establish an additional unit of similar scale on a site approximately
4.59 acres in size and with a level of fit-out and also includes some development of
the wider site to accommodate a Sustainable Urban Drainage System (SUDS) and
road infrastructure. 
2.5 This Full Business Case (FBC) focusses on Phase Two of the project which requires
an overall estimated capital funding of £6.775M comprised of £4.706M from the LRF
and £2.069M from the Ayrshire Growth Deal. The funding supports the design and
build contract, consultancy costs, fees and staff costs for the development and
delivery of the project. The LRF contribution is assisting to address the increase in
construction costs over the time period of the AGD. 
2.6 The project and wider programme have revenue implications which are set out in
Section 4.1. In summary, there will be revenue costs incurred until the unit is occupied
and in relation to ongoing wider site maintenance. These costs will be met from
existing resources in the short term and recovered through additional rental income,
received once the unit and further developments are occupied. The marketing of the
unit will commence following the award of contract. 
2.7 The key risks related to the project are detailed within the FBC. These include tenders
received being above the available budget, potential delays to the expected timeline
for the approval of the FBC and award of tender, or unforeseen project complexities
that require additional funding. Mitigations include the delivery of Phase One in close
proximity to the Phase Two site and the availability of wider site information and the
approval of Phase One FBC. 
2.8 The draft FBC has been provided at Appendix One for Cabinet’s consideration, whilst
initial feedback from both Governments is awaited and the tender process for the
design and build contract is underway. The FBC will be updated informed by the
feedback and outcome of the tender process for submission to the Ayrshire Economic
Joint Committee (AEJC) for approval. Following the award of the contract, the
contractor will finalise the design, apply for building warrant and commence the
contract works. 
2.9 Progress of Phase Two represents continued positive investment in the i3 area and
the development of an innovation cluster complemented by wider investment in the
Digital Process Manufacturing Centre which adjoins the Phase One and Phase Two
flexible space sites, investment in active travel routes into i3 and the expected major
investment in AI and data centre development at the Strategic Investment Campus
site. 
3. Proposals 
3.1  It is proposed that Cabinet agrees to: 
a) Endorse the Full Business Case for Phase 2 of the Flexible Advanced
Manufacturing Space project at i3, subject to feedback from Scottish and UK
Governments and the successful outcome of the current tender process;  
339

Page 340

b) Delegate authority to the Executive Director (Place) to update the Full Business
Case to reflect the feedback and outcome of the tender process; and
c) Approve the submission of the Full Business Case to the Ayrshire Economic
Joint Committee (AEJC). 
4. Implications/Socio-economic Duty 
Financial 
4.1 The main financial implications of the project are:
i) Capital – An estimated capital investment of £6.775M is required for Phase 2
towards a design and build contract and related costs including staff costs and
fees. This is comprised of £2,068,741 from the AGD and £4,706,259 from LRF.
These budgets are included in the NAC capital programme. The project’s capital
costs will be confirmed in an updated report to Cabinet, following the current
tender process and will be subject to the selection of a preferred contractor within
the available budget. Feedback from Governments will provide confirmation that
Phase Two can proceed and enable the draw down of the Scottish Government
AGD grant as part of the project budget. The LRF monies are being prioritised to
ensure full expenditure within the fund’s timescales.
ii) Revenue – Similar to Phase One, it is anticipated that there will be revenue costs
incurred by the Council until the Phase Two unit is occupied, such as building
and grounds maintenance, security, rates and utility bills, building insurance,
statutory compliance certificates, EPC costs, legal fees and marketing and
promotion. In addition, there will also be costs related to wider site maintenance
for this Phase and future developments at i3. Revenue costs will be met from
existing resources in the short term and will be reimbursed once a tenant is in
place and rental income starts to be received. 
Human Resources 
4.2 None. The project is being managed by the Council’s Property Management and
Investment (PMI) Team with input from the Growth and Investment Project Lead. 
Legal 
4.3 All Statutory consents have been secured with the exclusion of the Building Warrant
which will be secured by the successful contractor. The award of the tender is
required within the 150-day period. Furthermore, the Council will require to ensure
compliance with the conditions set out within the Local Growth Fund award. 
Equality/Socio-economic 
4.4 The project seeks to tackle market failure through the provision of much needed new,
modern and more energy efficient business space to help local businesses grow and
expand and to attract inward investment to an area of above average unemployment
and low business investment. It will build on recent investment in Phase One of the
project which is now under tenancy, and complement the Digital Process
Manufacturing Centre (DPMC) pilot project at the adjoining site which is operated by
the National Manufacturing Institute Scotland (NMIS).
340

Page 341

Climate Change and Carbon 
4.5 An assessment of carbon impact has been undertaken for the project and is included
within the business case. The unit will offer modern sustainable design features
including sustainable urban drainage, solar panels and electric vehicle charging. In
addition, the selected contractor will be required to ensure that the building design will
facilitate the ability to achieve recognised standards for CO2 emissions. 
Key Priorities 
4.6 The project will contribute to a range of Council Plan outcomes including the key
activities to develop infrastructure to support business growth and support local
businesses and economic opportunities. 
Community Wealth Building 
4.7 The project will contribute to Community Wealth Building and will have a significant
positive impact on Council’s ambitions under the Land and Assets pillar. In relation to: 
• Procurement: Local procurement and supply chain opportunities will be created
through the project.
• Fair Employment: The project will create employment opportunities particularly
within the construction sector and wider opportunities when the commercial
space is occupied by a tenant.
• Land and Assets: The project will regenerate a site which is long term vacant and
derelict land and identified as priorities for investment. This will bring
underutilised land into positive use to support local social, economic and
environmental wellbeing.
• Financial Power: The project will invest in localities and leverage external
national investment into North Ayrshire.
• Plural Ownership: The project will create commercial space to support local
businesses to stay and grow in North Ayrshire. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
341

Page 342

5. Consultation 
5.1 The Council’s PMI, Finance, Legal, Business Support and Development and Estates
Teams have been involved in the development of the project. An updated report for
the Irvine area by property agents has confirmed ongoing demand for the business
space alongside ongoing engagement with local businesses by the Business Support
and Development team. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Bruce McClure, Senior Manager, Growth and
Investment, on 01294 324176. 
Background Papers
Cabinet Report, 29 November 2022, Flexible Advanced Manufacturing Space, i3 Irvine:
Phase 1, Full Business Case
Cabinet Report, 21 March 2021, i3 Advanced Manufacturing Space Project, Irvine 
342

Page 343

NAC Growth and Investment 
AGD Business Case 
1
i3, ADVANCED MANUFACTURING SPACE
Full Business Case, Phase 2 
Version No.2 
Issue Date: 01 May 2026 
343

Page 344

NAC Growth and Investment 
AGD Business Case 
2
VERSION HISTORY 
Version  Date Issued  Brief Summary of Version / Change  Owner’s Name
1 10 April 2026 First draft version – issued to PMO Marnie Ritchie 
2 01 May 2026 Second version addressing initial PMO feedback M Ritchie, L Jamieson, K
MacDonald             
344

Page 345

NAC Growth and Investment 
AGD Business Case 
3
Table of Contents 
Part A  Project Description 
Part B  The Five Cases 
1. EXECUTIVE SUMMARY .............................................................................................. 11
1.1 Introduction .............................................................................................. 11
1.1.1 Project aims & objectives ...................................................................... 12
1.1.2 Project scope ........................................................................................ 12
1.1.3 Project phases ...................................................................................... 14
1.1.4 Structure and content ........................................................................... 18
1.2 Strategic case .......................................................................................... 18
1.2.1 The strategic context ............................................................................ 18
1.2.2 The case for change ............................................................................. 20
1.3 Economic case ........................................................................................ 21
1.3.1 OBC long list and short list ................................................................... 21
1.3.2 The procurement .................................................................................. 23
1.3.3 Key findings and the preferred option ................................................... 23
1.4 Commercial case ..................................................................................... 24
1.4.1 Agreed products and services .............................................................. 24
1.4.2 Agreed risk allocation and charging mechanism .................................. 24
1.4.3 Key contractual arrangements .............................................................. 24
1.4.4 Agreed implementation timescales ....................................................... 24
1.4.5 Accountancy treatment ......................................................................... 25
1.5 Financial case .......................................................................................... 25
1.5.1 Financial expenditure ........................................................................... 26
1.5.2 Overall affordability and balance sheet treatment ................................. 26
1.6 Management case ................................................................................... 27
1.6.1 Project management arrangements ..................................................... 27
1.6.2 Benefits Realisation and Risk Management ......................................... 27
1.6.3 Post project evaluation arrangements .................................................. 27
1.7 Recommendation ..................................................................................... 27
2. THE STRATEGIC CASE ................................................................................................ 29
2.0 Introduction .............................................................................................. 29
2.1 Organisational overview ........................................................................... 30
2.2 Business strategies .................................................................................. 30
2.3.2 Regional Policy Context ........................................................................ 34
345

Page 346

NAC Growth and Investment 
AGD Business Case 
4
2.4 Investment objectives .............................................................................. 36
2.4.1 Strategic need ...................................................................................... 37
2.5 Existing arrangements ............................................................................. 38
2.6 Business needs ....................................................................................... 38
2.6.1 Property market assessment ................................................................ 39
2.7 Potential business scope and key service requirements .......................... 39
2.8 Main benefits criteria ................................................................................ 40
2.9 Main risks ................................................................................................. 41
2.10  Constraints .............................................................................................. 46
2.11 Dependencies .......................................................................................... 46
3. THE ECONOMIC CASE ............................................................................................... 47
3.1 Introduction .............................................................................................. 47
3.2 Critical success factors ............................................................................ 47
3.3 The long-listed options, Flexible Space Programme ................................ 48
3.4 Short-listed options, Flexible Space Programme ..................................... 50
3.5 The procurement process ........................................................................ 56
3.5.1 The Long List Criteria ........................................................................... 56
3.5.2 Long list ................................................................................................ 56
3.5.3 Short list criteria .................................................................................... 57
3.5.4 Short list ................................................................................................ 57
3.6 Economic appraisal .................................................................................. 57
3.6.1 Introduction ........................................................................................... 57
3.6.2 Estimating benefits ............................................................................... 57
3.6.3 Estimating costs ................................................................................... 59
3.6.4 Cost appraisal conclusions ................................................................... 59
3.7 Qualitative benefits appraisal ................................................................... 59
3.7.1 Methodology ......................................................................................... 59
3.7.2 Qualitative benefits criteria ................................................................... 60
3.7.3 Qualitative benefits scoring ................................................................... 61
3.7.4 Analysis of key results .......................................................................... 61
3.8 Risk appraisal – unquantifiables .............................................................. 61
3.9 The preferred option – selected supplier .................................................. 61
3.10 Sensitivity analysis ................................................................................... 62
3.11 The preferred option ................................................................................ 62
3.12 Sustainability and carbon ......................................................................... 62
346

Page 347

NAC Growth and Investment 
AGD Business Case 
5
3.13 Economic / Financial ................................................................................ 62
3.13.1 Embodied Carbon ................................................................................. 62
3.13.2 Operational Carbon .............................................................................. 63
4. THE COMMERCIAL CASE ........................................................................................... 64
4.1 Introduction .............................................................................................. 64
4.2 Required services .................................................................................... 65
4.3 Potential for risk transfer .......................................................................... 67
4.4 Agreed charging mechanism ................................................................... 67
4.5 Agreed contract length ............................................................................. 68
4.6 Key contractual clauses ........................................................................... 68
4.7 Personnel implications (including TUPE) ................................................. 68
4.8 Procurement route and implementation timescales ................................. 68
4.9 FRS 5 accountancy treatment ................................................................. 69
5.0 THE FINANCIAL CASE ................................................................................................ 70
5.1 Introduction .............................................................................................. 70
5.2 Impact on the organisation’s income and expenditure account ............... 71
5.3 Local Regeneration Fund (formerly Levelling Up Fund, 3) ....................... 71
5.4 Impact on the balance sheet .................................................................... 71
5.5 Overall affordability .................................................................................. 72
6.0 THE MANAGEMENT CASE ......................................................................................... 73
6.1 Introduction .............................................................................................. 73
6.2 Programme management arrangements ................................................. 73
6.3 Project management arrangements ......................................................... 74
6.3.1 Project reporting structure .................................................................... 74
6.3.2 Project Roles and Responsibilities ....................................................... 75
6.3.3 Project Plan .......................................................................................... 75
6.4 Use of Special Advisers ........................................................................... 76
6.5 Arrangements for change management ................................................... 77
6.6 Arrangements for benefits realisation ...................................................... 77
6.7 Carbon management ............................................................................... 78
6.8 Arrangements for risk management ......................................................... 78
6.9 Arrangements for contract management .................................................. 79
6.10 Arrangements for post project evaluation ................................................ 79
6.11 OCG Gateway review arrangements ....................................................... 79
6.12 Contingency plans ................................................................................... 80
347

Page 348

NAC Growth and Investment 
AGD Business Case 
6
Appendices 81
APPENDIX A: INCLUSIVE GROWTH HEAT MAP ............................................................................... 82
APPENDIX B: AGD PROJECT LINKS .................................................................................................. 83
APPENDIX C: BENEFITS REALISATION LOGIC CHAIN ...................................................................... 85
APPENDIX D: ECONOMIC MODELLING, i3 FLEXIBLE SPACE PHASE 2 ............................................. 86
APPENDIX E: RISK REGISTER ......................................................................................................... 104
APPENDIX F: INCLUSIVE GROWTH & COMMUNITY WEALTH BUILDING ..................................... 110
APPENDIX G: COMMUNITY BENEFIT STATEMENT ........................................................................ 111
APPENDIX H: EQUALITY IMPACT ASSESSMENT ............................................................................ 113
APPENDIX I:  CARBON ANALYSIS ................................................................................................. 121
APPENDIX J: AYRSHIRE GROWTH DEAL CHANGE MANAGEMENT PROCESS ............................... 122 
LIST of FIGURES 
1: Flexible Space, Phase 1, (4A Riverside Way, now complete and let)
2: Project location showing area of focus of AGD Investment 
3: Location of Flex Space Phase 1 & DPMC Pilot (within Booth Welsh), on Riverside Way, i3 
4: excerpt from i3 draft masterplan, 2021 
5: Image of proposal at OBC / Phase 1 FBC Stage
6: Updated - Proposed Phases of Flexible Space Programme
7: Updated Flexible Space Masterplan 
8: Active travel path connections to Riverside Way i3, delivered 2021/22
9: Current active travel route improvements in proximity to Ph 1 Flex Space i3 (shown green) 
10: Recent Active Travel Improvements on Long Drive
11: Phase 1, Flex Space (4A Riverside Way), front & rear elevations 
12: RIBA 2030 Climate Change Target Metrics 
13: Phase 2 Unit drawings 
14: Standard AGD Governance approach 
15: Organisational chart, showing governance of the project 
LIST of TABLES 
1: Flex Space Phase 2 Unit Specification 
2: Flexible Advanced Manufacturing Space estimated floorspace profile at OBC stage
3: Flexible Advanced Manufacturing Space profile – reduced and at FBC Ph 1 stage.
4: Flexible Advanced Manufacturing Space profile – at Phase 2 FBC stage. 
5: Strategic Drivers for Investment in Advanced Manufacturing Space at i3
6: Assessment of Options at i3 – Long List at OBC Stage 
7: Assessment of Options for i3 - Short List OBC Stage
8: Phase 2 and Phase 1 Options considered 
9: Flexible Space Phase 2, Project Milestones (working version)
10: Flexible Advanced Manufacturing Space, Phase 2 - Source of Capital Funds 
11: Flexible Space Financial Profile – Capital – updated 
12: National Policy and Strategies
348

Page 349

NAC Growth and Investment 
AGD Business Case 
7
13: Project’s Relationship to UK’s Modern Industrial Strategy 
14: Project’s Relationship to Scotland’s National Strategy for Economic Transformation  
15: Regional & Local Policy & Strategies 
16: Flexible Space Investment Objectives 
17: Investment Objectives and Stakeholder Benefits 
18: Flexible Advanced Manufacturing Space – Project Risks, Updated  
19: Critical Success Factors 
20: Preferred Way Forward, Flexible Space Programme – OBC Stage
21: Review of Critical Success Factors for Shortlisted Options for Overall Flexible Space Programme at
OBC Stage 
22: High-level Economic Outcomes at OBC Stage 
23: OBC Investment Appraisal Ranking 
24: Flexible Space, Phase 1 - Options 
25: Flexible Space Phase 2 Options 
26: Benefits-Cost Ratio Timeframe - 25 Year Appraisal
27: Benefits-Cost Ratio Timeframe - 25 Year Appraisal (Construction Impacts Removed)
28: Main Benefits
29: i3 Flexible Advanced Manufacturing Space - Outputs, Outcomes and Impacts, Benefits Realisation
Plan 
30: Qualitative Benefits Criteria
31: Estimated Embodied Carbon, Flexible Space Phase 2
32: Estimated Operational Carbon, Flexible Space Phase 2
33: Estimated Whole Life Carbon, Flexible Space Phase 2 
34: FBC Flex Space Phase 2, Risk Transfer Analysis 
35: Key timescales for progress of Phase 2 Unit 
36: Flexible Space Phase 2, Project Spend Profile 
37: Roles & Responsibilities 
38: Special Advisers 
39: Benefits-Cost Ratio Timeframe - 25 Year Appraisal – Sensitivity Testing of Single Unit
40: Benefits-Cost Ratio Timeframe - 25 Year Appraisal (Construction Impacts Removed) - Sensitivity
Testing of Single Unit
41: Economic Outputs – Overall value for money assessment
42: Profile of Benefits Accrued – 5 Year Periods 
43: Green House Gas Accounting 
349

Page 350

NAC Growth and Investment 
AGD Business Case 
8
PART A: Project Description 
What is the project about?
This project is the second phase of the i3 flexible advanced manufacturing space project at i3
Business Park in Irvine, which is a strategic site for North Ayrshire Council and was
designated as a Life Science Enterprise Area in 2012. Phase 1 delivered an advanced
industrial unit of 18,180 ft2 (1,690 m2) GIFA to a shell specification suitable for Classes 4, 5
and 6, capable of subdivision to a maximum of 4 self-contained units with a rear service yard
and parking spaces, on a total site area of 10,972 m2 or 2.7 acres and at a total cost of
£5.147M, which included £0.967M of VDLF funds. The unit is now being leased to Barony
Universal Products Ltd who have recently submitted a planning application for an extension to
accommodate a new production line and related plant. 
The budget for Phase 2 is £6,775,000. It should be noted that Phase 2 is mostly being
funded by £4,706,259 of the Local Regeneration Fund (formerly the Levelling Up 3
funds) from UK Government, with the remaining funds of £2,068,741 covered by the
Ayrshire Growth Deal, comprising £355,650 from North Ayrshire Council and £1,713,091
from Scottish Government. This will deliver a unit of similar size c1,690m2 on a site
approximately 4.59 acres in size but also includes some development of the wider site to
accommodate suds and roads infrastructure. 
The project is being delivered in a number of phases. A third phase of the FBC will be
submitted in 2027 to cover the final phase of the project. 
This Full Business Case (FBC) for Phase 2, follows on from an Outline Business Case (OBC)
for the overall project which was approved in June 2021 and a Full Business Case for Phase 1
which was approved in December 2022. NAC is seeking the timely endorsement of the FBC
for Phase 2 by the Scottish Government and its subsequent approval by the Ayrshire
Economic Joint Committee (AEJC) to enable the construction works contract to be awarded
by September 2026 and the works to be completed by September 2027. The tender is
currently being prepared for publication. Timelines are critical to ensure that the tender award
takes place before the 150-day period expires for tenderers holding their costs. The funds
sourced from the Local Regeneration Fund require to be spent by 31 March 2028. 
Tenders will be received for the Phase 2 contract works and the details will be contained
within the Commercial Case in Section 4 in an updated version of the FBC. It should be noted
that these details will be limited following advice from the Council’s Corporate Procurement
Unit, who advised that the sharing of commercial information should be limited prior to the
award of the tender. 
The project will complement Phase 1 of the programme and also the Digital Process
Manufacturing Centre (DPMC) facility which is being supported by the Ayrshire Growth Deal
(AGD) and has been delivered in partnership with NMIS (National Manufacturing Institute
Scotland), University of Strathclyde and CPI (Centre for Process Innovation). The DPMC is
currently operating as a pilot in close proximity to the location of the Phase 1 Flex Space unit
and the Phase 2 Flex Space site. 
Why is it being undertaken?
Phase 2 of the project will contribute towards meeting current demand for new industrial space
within North Ayrshire and Ayrshire, where there is a longstanding issue of market failure that
discourages the private sector from building new space. It will help grow local businesses and
attract inward investment to an area of above average unemployment and low business
investment. It will also help to address an ongoing issue of ageing, obsolete industrial space.
350

Page 351

NAC Growth and Investment 
AGD Business Case 
9
The new space also provides the opportunity for interest from businesses linked to the DPMC
project to take up space, helping create a cluster of industry and innovation at i3. 
How does it fit within the wider Deal?
This project contributes to the wider AGD Economic Infrastructure Programme, addressing
economic underperformance by helping position Ayrshire as the go-to region for smart
manufacturing and digital skills and by improving access to employment opportunities. It
complements the Ayrshire Innovation Park development at Kilmarnock and commercial space
proposals at Prestwick and provides opportunities for investment linked to the DPMC and
Building Digital Capital AGD projects.   
What is being proposed?
The original approved OBC estimated that the project would involve the phased delivery of
approximately 9,000 m2 (97,000 sq ft) of floorspace in a variety of building types to suit
varying needs, ranging from larger 20,000 sq ft to 40,000 sq ft units capable of subdivision, to
small, terraced business incubation units and class 4 offices. A draft masterplan was
developed in 2020/21 to show the potential location and scale of development across i3. The
majority of the buildings were proposed to be located within a central area of i3, creating a
cluster area with the proposed DPMC. A small number of units were also proposed at the
large Strategic Investment Campus site at i3, to stimulate interest in this area. 
A review of costs at Phase 1 FBC stage identified that the costs of delivering each phase was
likely to be higher than the estimates contained in the OBC, due to the further development of
the project following OBC stage which provided a more accurate assessment of costs but also
due to cost inflation. It was then highlighted that the level of floorspace that could be delivered
for the available budget would be lower than that approved in the OBC at 9,000 sq m.
Projections at Phase 1 FBC stage estimated that the amount of floorspace that could be
delivered could within the available budget could be 6,000 sq m and this was accounted for in
the economic modelling. In order to offset these increased costs, allocations from the Vacant
and Derelict Land Fund have supported the development and delivery of Phase 1 and the
Local Regeneration Fund (formerly LUF3) is supporting Phase 2. 
How will it be delivered?
The overall project is being delivered in phases, allowing for a review of the market at key
stages.  Each phase will be designed by a professionally qualified team, led by architects and
tendered in packages over a number of phases through either a traditional procurement route
or a design and build route. Phase 2 is the subject of this FBC and has been developed with
support from North Ayrshire Council’s architects and quantity surveyors and is being tendered
as a design and build contract.   
What outcomes will it deliver and by when?
The outcomes anticipated include the delivery of much needed modern business space, new
jobs and construction jobs, support to SMEs, additional GVA, access to related employability
and skills programmes for local people including those from disadvantaged or protected
characteristic groups and removal of sites from the vacant and derelict land register. A
Benefits Realisation Plan has been prepared for the overall project in conjunction with the
Ayrshire Growth Deal PMO and Phase 2 will contribute to these outcomes. 
Who will use it and why?
The project will be marketed widely to local companies, including SME’s looking to grow and
expand and to inward investment companies from Ayrshire, Scotland, the UK and beyond. A
marketing campaign will be prepared for Phase 2. At closing date for marketing, Phase 1
received four bids to lease the premises, providing evidence of demand for Phase 2. 
351

Page 352

NAC Growth and Investment 
AGD Business Case 
10
What are the headline figures around what is being proposed? 
An allocation of £15M from the Ayrshire Growth Deal was agreed for the i3 Flexible Space
project, comprised of £11M from Scottish Government and £4M from North Ayrshire Council.
Overall, £22.225M is being invested at i3 by the Ayrshire Growth Deal, including an allocation
of £7.225M contributing to the DPMC project. This has been added to by £4.706M from the
Local Regeneration Fund from UK Government for Phase 2 of the project, providing an overall
investment of £26.931M. 
Phase 2 is the beneficiary of funding from the Local Regeneration Fund as part of an overall
£17.5M allocation to North Ayrshire, aiming to address market failure through the delivery of
new energy efficient commercial property alongside the provision of low carbon infrastructure
at key employment sites including i3.   
Phase 1 has invested a total of £5.147M, comprising £4.180M of AGD committed capital
funding towards the first unit, supported by £0.967M of Vacant and Derelict Land Funds. 
Figure 1: Flexible Space, Phase 1, (4A Riverside Way, now complete and let) 
352

Page 353

NAC Growth and Investment 
AGD Business Case 
11
PART B: The Five Cases
1. EXECUTIVE SUMMARY   
1.1 Introduction 
This Full Business Case (FBC) seeks approval for investment in Phase 2 of the i3 Flexible
Advanced Manufacturing Space project of up to a maximum of £2.069M of capital, including a
contract with a supplier, to undertake the construction of an 18,191 sq ft (1,690 sq m)
industrial unit as a second phase of the project. The remainder of the required funds of
£4.706M are being covered by the Local Regeneration Fund (formerly LUF3). The delivery of
further phases of the project will be set out in subsequent updates to the FBC. 
This FBC for Phase 2, follows on from the approval of the first FBC for Phase 1 in December
2022, and the project’s original Outline Business Case (OBC) approved in June 2021 for the
investment of £15M in the delivery of approximately 97,000 sq ft (approx. 9,000 sq m) of
flexible advanced manufacturing space at i3. The Phase 1 FBC and related change request
of April 2022 gained approval for a reduction in the anticipated level of floorspace that would
be delivered by the AGD, from 9,000 square metres to 6,000 square metres. Additional funds
secured from the Local Regeneration Fund (formerly LUF3) have sought to offset this risk to
project outcomes. 
The overall project includes the delivery of business space in various configurations, aiming
to meet demand in a series of phases, responding to market requirements and with a focus
on high value sectors. This includes chemical and life science manufacturing, more general
local demand and opportunities for space emerging from the development of the Digital
Process Manufacturing Centre (DPMC) at i3 by NMIS, CPI and NAC. The DPMC is being
delivered as part of the same AGD Economic Infrastructure Programme and is now
operational and engaging with business and industry as an NMIS specialist centre at
Riverside Way in i3. 
Figure 2: Project location showing area of focus of AGD Investment 
353

Page 354

NAC Growth and Investment 
AGD Business Case 
12 
1.1.1 Project aims & objectives
The main investment objectives of the overall project are: 
• To create flexible business space capable of meeting manufacturing requirements for
chemical and life sciences, but also for a wide range of other high value sectors;
• To create a centre of digital innovation which offers digital tools, support and
innovation scaled to a national market supporting a restructure of the regional
economy to deliver advanced manufacturing;
• To create serviced industrial land and capable of immediate development;
• To create opportunities for employment and inclusive growth with particular emphasis
on making connections to local communities, schools and colleges in preparation for
employment, particularly in areas of deprivation and targeting people drawn from
disadvantaged or Protected Characteristic groups including women and young people;
• To attract mobile and private sector investment both from abroad and from indigenous
companies; and
• To create a sustainable, high quality business location and R&D cluster, capable of
meeting and keeping pace with the changing demands of high value manufacturing
sectors and complementing national initiatives including NMIS 
The project is now beginning to deliver on these objectives with the completion of the first
phase of business space and the operation of the DPMC pilot, which is adjacent to flex space,
combining to help enable a small innovation cluster. The project also aligns with Inclusive
Growth & Community Wealth Building objectives (see Appendix F).   
1.1.2 Project scope
The scope of the overall project is to contribute to the AGD’s Economic Infrastructure
Programme using £15M of AGD investment, additional leverage of £4.706M from the UK
Government’s Local Regeneration Fund (formerly LUF 3) and early support funding of
£0.967M from the Scottish Government’s Vacant and Derelict Land Fund (VDLF), to create
modern flexible advanced manufacturing space that addresses the current issues businesses
and inward investors are facing, with lack of modern business space provision in Ayrshire,
impacting on business growth and expansion. 
The project is focused on delivering this space at i3, east of Irvine town centre. The area was
developed as part of Irvine New Town from the early 1970s.  Given that the town was
originally planned with a much higher population than realised, and due to differing industrial
structures at the time, the i3 area is of significant scale and covers around 132 ha. Parts of i3
remain undeveloped and/or are in private ownerships and the flexible space development will
help to address this by focusing AGD development within a central area around Riverside
Way. The inclusion of flexible space and DPMC within this area helps to provide a sense of
consolidation, focus and longer term, presents the opportunity to provide services and
networking opportunities for businesses (see Figure 3). The large SIC site owned by NAC
(see Figure 2) was recently marketed for sale in 2025 and is now in the process of being sold,
subject to suspensive conditions. It has also been put forward for AI Growth Zone status,
which is currently being considered. 
354

Page 355

NAC Growth and Investment 
AGD Business Case 
13 
Figure 3: Location of Flex Space Phase 1 and DPMC Pilot (within Booth Welsh), on Riverside Way, i3 
The advanced manufacturing space proposed will complement the DPMC project and
provide modern space in a number of phases. Now operational as a pilot, the DPMC is
raising the profile of i3 and encouraging business investment and growth with a focus on
Industry 4.0. The proposed investments are part of a strategy for i3 that allows the central
Riverside Way area to be developed as a core commercial space and potential service area
for i3, that includes flexible space and the DPMC facility, with the large Strategic Investment
Campus targeted for major inward investment linked to potential datacentre and AI
development through the sale of the site. 
The proposed Phase 2 unit includes the following specifications: 
Table 1: Flex Space Phase 2 Unit Specification 
ITEM  PROVISION 
GENERAL
• Unit specification suitable for immediate occupation
• GIFA 18,191 ft2 (1690m2)
• Site Area 74,023ft2 (6877m2)
• Steel portal frame
• Profiled and microrib cladding panels to Building Standards Class 1
Storage/Factory Use
• Cat A office fit out
• Fully serviced with water and electricity (metered)
• BT Openreach FTTP fibre connection
• Storage areas for waste collection and provision of infrastructure to
facilitate future installation of sprinkler system tank provided 
355

Page 356

NAC Growth and Investment 
AGD Business Case 
14
ITEM  PROVISION 
POWER
• 100kVA 3-phase supply to each unit
• additional ducts to each sub-divided unit will be installed to allow
future Tenants to apply for individual LV connections based upon their
anticipated design load requirements.
• all apparatus and wiring connected to the low voltage systems shall be
suitable for use with a 3 Phase, 4 Wire, 400 Volt or 230 Volt, Single
Phase, 50 Hertz earthed neutral system.
WAREHOUSE/
FACTORY
• 8m haunch height (9.28m to ridge)
• Concrete floors with 50kN/m2 floor loading
• 10% roof lights
• Powered 4.4m (H) x 4.76m (W) level loading doors
• High bay LED lighting (330 lux)
OFFICE & 
CONVENIENCE
• Suspended ceilings with recessed LED lighting
• Kitchen
• Unisex and accessible WCs
EXTERNAL
• Secure 31.5m deep concrete service yard with gates will be formed to
the rear of the property accessed from a road constructed to
adoptable standards and suitable for RCC (Roads Construction
Consent)
• Dedicated car parking to NRDG Standards
• Covered Bicycle storage to NRDG Standards
SUSTAINABILITY 
• EPC rating "B"
• EV charging points
• Water saving sanitaryware
• Low energy PIR controlled LED lighting
• Air source heat pump for office heating and cooling
• Roof mounted solar PV installed with scope to increase this as
required.
SECURITY 
• gated access,
• intruder alarm 
• internal & external security lighting
• 2.4m high open mesh steel panel Security Fencing to the boundary 
VEHICLE PARKING • 35 spaces for General Industrial (Class 5) use in accordance with
minimum NRDG Standards
DISABLED PARKING  • 4 spaces 
EV PARKING  • 4 active spaces / 8 passive spaces 
CYCLE PARKING  • 12 spaces or 6 cycle stands 
The unit will be constructed north-west of and immediately adjacent to the Phase 1 unit and in
close proximity to the DPMC Phase 1 pilot facility. Phase 1 and 2 of the flex space project and
the DPMC pilot will begin to create the cluster of activity at i3. 
1.1.3 Project phases 
Estimated Floorspace at Outline Business Case Stage 
The original OBC anticipated that the following range of units in Table 2 would be delivered in
a number of phases through the £15M investment. This was informed through market
assessment and includes the Phase 1 unit highlighted in red, which is now complete. 
356

Page 357

NAC Growth and Investment 
AGD Business Case 
15 
Table 2: Flexible Advanced Manufacturing Space estimated floorspace profile at OBC stage
Description  Size - sq m Size – sq ft
Flexible Space Estimated Floorspace at OBC Stage 
Terraced units, capable of subdivision  232 2,500
Terraced units, capable of subdivision  465 5,000
Modular building (capable of subdivision and or expansion) 1,858 20,000
Serviced plot  tbc tbc
Two office pavilions (2 x 425 sq.m.) 850 9,150
Modular building (capable of subdivision and or expansion) 3,716 40,000
Modular building (capable of subdivision and or expansion) 1,858 20,000
Total estimated floorspace  8,979 96,650 
These configurations are shown in the i3 draft Masterplan from 2021. Please see the excerpts
below. Figure 4 shows the proposed buildings in blue as part of the i3 AGD investment and
the potential development in other areas of i3 in red, should funding become available. Figure
5 shows an image of the proposals at that stage. 
Figure 4: excerpt from i3 draft masterplan, 2021 
Figure 5: Image of proposal at OBC / Phase 1 FBC Stage 
Proposed
Flex Space
Phase 1 
Booth Welsh &
DPMC Ph 1
Proposed
terraced units
Proposed DPMC Phase 2
357

Page 358

NAC Growth and Investment 
AGD Business Case 
16 
Estimated Floorspace at Phase 1, Full Business Case Stage 
The Phase 1 FBC advised that due to cost increases, the scale of floorspace to be delivered
was likely to be reduced and it was assumed that the estimated floorspace that could be
delivered would be in the region of 6,000 m2 for which the profile was shown in the table
below with Phase 1 highlighted again.   
Table 3: Flexible Advanced Manufacturing Space profile – reduced and at FBC Phase 1 stage. 
Description  Size - sq m Size – sq ft
Flexible Space Estimated Floorspace at Phase 1 FBC Stage
Terraced units, capable of subdivision  232 2,500
Terraced units, capable of subdivision  465 5,000
Modular building (capable of subdivision and or expansion) 1,690 18,180
Modular building (capable of subdivision and or expansion) 1,858 20,000
Modular building (capable of subdivision and or expansion) 1,858 20,000
Total estimated floorspace  6,103 65,680 
Estimated Floorspace at Phase 2, Full Business Case Stage 
For the purpose of Phase 2, the scale of floorspace to be delivered has been reviewed again
and the approach to how the AGD investment would be developed has also been reviewed as
part of wider considerations of the land available. The amended plans below show the
development of industrial units off Riverside Way, including the location of the Phase 1 and
Phase 2 units and a proposed Phase 3 which is terraced units and potential future
development plots or a further unit, subject to future funding (Figure 6). A cost plan for Phase
3 is awaited, to establish if additional floorspace can be delivered beyond the terraced units, to
ensure that the floorspace can be achieved that was estimated at Phase 1. Whilst the
Programme has benefited from Local Regeneration Funds, Phase 2 requires to deliver
significant infrastructure for the wider site, as a result of planning requirements. The focus of
development has been intensified around DPMC Phase 1 (Figure 7), with the large SIC site
indicated on the original masterplan now in the process of being sold for redevelopment.
Figure 7 also shows a potential site option for DPMC Phase 2 as part of the cluster. Further
investment is also anticipated as the new tenant of Phase 1 has submitted a planning
application for an extension of approximately 1,200m2.   
358

Page 359

NAC Growth and Investment 
AGD Business Case 
17
Figure 6: Updated - Proposed Phases of Flexible Space Programme 
Figure 7: Updated Flexible Space Masterplan 
359

Page 360

NAC Growth and Investment 
AGD Business Case 
18
Table 4: Flexible Advanced Manufacturing Space profile – at Phase 2 FBC stage. 
Description  Status Square
metres 
Square
feet
Flexible Space Estimated Floorspace at Phase 2 FBC Stage 
Modular building (capable of subdivision & expansion), Phase 1 Complete 1,690 18,180
Modular building (capable of subdivision & expansion), Phase 2 FBC 1,690 18,180
Terraced units (3A), capable of subdivision, proposed Phase 3 Design 642 6,910
Terraced units (3B), capable of subdivision, proposed Phase 3   Design 426 4,585
Remaining floorspace to be achieved to meet current floorspace
target, by serviced plots or additional unit  Design  1,655 17,825
Total estimated floorspace   6,103 65,680 
1.1.4 Structure and content 
This Full Business Case (FBC) sets out details related to Phase 2 of the project. The format
used is the Five Case Model and follows the AGD Project Management Office (PMO)
template. Subsequent updates to this FBC will be submitted for future phases of the project. 
1.2 Strategic case 
1.2.1 The strategic context 
The following table summarises the strategic drivers for this investment with the associated
national, regional and local strategy, plan or policy listed below: 
Table 5: Strategic Drivers for Investment in Advanced Manufacturing Space at i3
UK Policy Agenda Scottish Government Policy  Ayrshire Regional Policy
The UK’s Modern
Industrial Strategy 2025
Scotland’s National Strategy for
Economic Transformation, 2022-2032
Ayrshire Regional Economic Strategy 2023-
2033
UK Life Sciences Sector
Plan 2025
A Manufacturing Future for Scotland,
2016
North Ayrshire Council, Council Plan
2023-2028
Levelling Up the UK:
Executive Summary
Making Scotland’s Future: a recovery
plan for manufacturing & subsequent
programme
Sustainable North Ayrshire Strategy
2024-2027 
Scotland’s 2018 – 2032 Climate
Change Plan, Updated 2020
North Ayrshire Council Community
Wealth Building Strategy 2024-2027 
Life and Chemical Sciences
Manufacturing Strategy for Scotland 
Skills and Investment Plan for
Scotland’s Life and Chemical Sciences
LOIP – Irvine Locality Action Plan 2023/24  
Life Sciences Strategy for Scotland
2025 Vision
Ayrshire Growth Deal Agreement 
Chemical Sciences Scotland Strategic
Plan 2025
North Ayrshire Council Local
Development Plan 2 and emerging LDP3 
Green Data Centres and Digital
Connectivity Vision and Action Plan,
2021 
Shortlist for Data Centre Site Selection
in Scotland 2021 
A changing nation: how Scotland will
thrive in a digital world 
Shaping Scotland’s Economy: Inward
Investment Plan 2020 
Programme for Government, 2024 to
2025 Serving Scotland 
National Planning Framework 4, 2023 
360

Page 361

NAC Growth and Investment 
AGD Business Case 
19 
National Innovation Strategy, 2023-33 
This £15M project is part of an overall investment of £22.225M that is being sought for i3
through the Ayrshire Growth Deal, with committed funding secured from UK Government
(£6.225M), Scottish Government (£11M) and North Ayrshire Council (£5M). £7.225M is
focussed on investment in the Digital Process Manufacturing Centre (DPMC) which is now
operational as a pilot with partners and is assisting in driving demand for space at i3 and
raising the profile of i3. It provides a unique facility and hub for businesses within process
manufacturing sectors (including Pharmaceutical Products, Oil & Gas, Chemicals and
Chemical Products, Agrichemicals (under life sciences), Food & Drink, Fast moving consumer
goods (FMCG) and Water (collection, treatment, supply) that are seeking to improve their
productivity and modernise their processes through digital automation. If the pilot is
successful, Phase 2 will be progressed which can expand on opportunities to provide events
and meeting space, R&D space, bio-manufacturing facilities and sector support. The UK
Government’s £6.225M contribution and a £1M contribution from North Ayrshire Council are
supporting the DPMC project. 
Previously a separate AGD Digital Programme Business Case led by South Ayrshire Council,
had included investment towards a subsea fibre optic cable and associated infrastructure that
may have had opportunities for Irvine as a potential landing point and investment linked to
data centres. However, a commercial case could not be advanced for the project and the
funds for the project have since been reallocated toward the Building Digital Capital
Programme across the three Ayrshire authorities, with North Ayrshire receiving c £4.631M
which could bring further investment to the i3 area. This would complement investment being
made by UK Government as part of the 5G Innovation Regions in partnership with NMIS at
i3, to provide a private 5G network with investment of £0.7M and the ambitions for AI campus
status focussed on the large Strategic Investment Campus. 
The Heat Map at Appendix A illustrates the strengths of relationships between the AGD
projects and the i3 project. The AGD Project Links Table at Appendix B, provides further
detail on particular AGD projects where there are strong links.   
I3 is also the focus of a number of improvements related to active travel to improve
connections to and from i3. Overall, the capital investment spent or planned at i3 through UK
& Scottish Government funds, amounts to approximately £33.5M. 
Figure 8: active travel path connections to
Riverside Way i3, delivered 2021/22 
Figure 9: current active travel improvements in
proximity to Phase 1 Flex Space (shown in green) 
Figure 10: Recent Active Travel Improvements on Long Drive
361

Page 362

NAC Growth and Investment 
AGD Business Case 
20 
1.2.2 The case for change 
AGD funding is required in order to meet demand for modern industrial accommodation in
the face of acute market failure. This is preventing private sector investment in speculative
industrial development across Ayrshire and most non-prime locations in Scotland. Recent
research commissioned by NAC has identified the following issues that demonstrate the
requirement for investment: 
• High demand for industrial space;
• Low vacancy rates for industrial space of less than 1% for Irvine, 2.4% for North
Ayrshire and 4.4% for West Central Scotland (among the lowest in the UK); 
(These figures were previously 4.5% for Irvine, 4.5% for North Ayrshire and 3.4% for West of
Scotland at Phase 1 FBC stage and 4%, 6% and 4% respectively at OBC stage)
• Insufficient rental values to support financially viable, new-build speculative
development;
• Very limited funding sources available for the public sector to intervene; 
• Constraints on indigenous companies seeking to grow and expand within North
Ayrshire; 
• Constraints on attracting inward investment through lack of modern premises; 
• Ageing building stock of existing industrial premises that is facing obsolescence; 
• Constraints due to companies being less accessible to disabled or mobility impaired
job seekers / trainees; and 
• Growing pressure through changes in legislation and customer demand, to create
better configured, more energy efficient building stock and eliminate hazardous building
materials. 
The overall i3 proposal has included engagement with the following partners and local
stakeholders through discussions and through commissioned research. 
• AGD PMO Team 
• Key Advisors (Scottish Enterprise)
• Local businesses 
• Irvine Locality Planning Partnership 
• Local industry leaders 
• Academia – NMIS, University of Strathclyde, CPI and Ayrshire College
• Other Council teams 
362

Page 363

NAC Growth and Investment 
AGD Business Case 
21
1.3 Economic case 
1.3.1 OBC long list and short list 
In terms of the best option for delivery of the overall programme for this project to meet
demand, a wide range of potential options were considered at OBC stage, in terms of location,
interventions and scale of interventions, funding sources and timescales, shown in the table
below. A preferred option was identified for each category and three options were then
considered in greater detail within the Economic Case: 
• Do Nothing – the Counterfactual Option; 
• The Preferred Option: Flexible Space, Phased; and 
• The Ambitious Option: Flexible Space, Accelerated. 
The Critical Success Factors used when evaluating the long list of options below included: 
• How does the option satisfy the AGD Vision & key themes?
• How does the option provide a holistic fit and synergy with other national, regional and
local strategies?  
• How does the option optimise value for money?
• Is the option viable and can it be delivered?
• Will the option meet an identified market demand, remove a constraint and how will it
affect existing supply?
• Can the option be funded by both the up-front capital and future revenue? 
The long list for the original OBC stage and the overall programme, is shown in the table
below: 
Table 6: Assessment of Options at i3 – Long List at OBC Stage 
OPTIONS 
1. LOCATION 
1.1 i3 Enterprise Area (EA)  1.2 Other North Ayrshire Site  1.3 Other Ayrshire Sites
i3 is one of two locations in
Scotland marketed by SDI for
manufacturing linked to life
sciences & related sectors. It
has key locational benefits for
investors, with existing
established businesses. 
Preferred Option 
A limited number of other North
Ayrshire sites have capacity to
accommodate new development
but are unable to offer the
locational advantages of i3,
installed infrastructure capacity
and existing business base. 
Discounted Option 
Irvine has key sector and cluster
strengths in life sciences, and is
therefore an attractive
proposition for investors in
comparison to other Ayrshire
sites.   
Discounted Option 
2.1 Site Preparation Only 2.2 Flexible Space on all Sites  2.3 Flexible Space 
1.
INTERVENTION  Create prepared site
platforms at i3, ready for
immediate development. This
would offer a low-cost option
but would fail to meet the
needs of life sciences and
related manu-facturing
businesses for premises.
Discounted Option
Flexible space across the whole i3
area, including the large Strategic
Investment Campus could mean
the space would be too
dispersed, reducing its impact
and chance to create a central
cluster of activity.   
Potential Future Option
Delivering flexible space on a
phased basis linked to the
DPMC proposal, and that
addresses market need for
business space with the
opportunity to review the
specification after Phase 1. 
Preferred Option
3. SCALE 3.1 Small-Scale / Cautious 3.2 Mid-Scale Market Ready   3.3 Large-Scale / Ambitious
Developing 1 or 2 shell
buildings to test market
Similar to Option 2.3, a
market-ready proposition that
Similar to Option 2.2, cost
savings could be made if
363

Page 364

NAC Growth and Investment 
AGD Business Case 
22
interest but discounted due to
value for money factors i.e.
there is clear demand for the
units proposed but developing
in smaller phases will
ultimately increase costs.
Discounted Option
balances forecast demand,
level of risk, cost efficiencies
and future flexibility. 
Preferred Option
large-scale flexible space was
delivered. This could
significantly increase costs
and risks, overstep the known
level of demand and is likely
to be in advance of need.
Discounted Option
4. FUNDING SOURCES 
4.1 Seek AGD Funding  4.2 Seek Other Public Funds  4.3 Seek Private Partner
AGD funding through the
public sector allows business
space to be provided in the
face of market failure as
development is not viable for
the private sector. Consider-
ation to be given to a rolling
development programme
utilising development income. 
Preferred Option 
There are no alternative public
sector funding sources
identified to deliver this scale of
intervention. We will continue
to scan the market to identify
other funding sources and
respond accordingly. 
Potential Future Option 
Attracting private investment
to develop new business space
was considered but has been
discounted due to its lack of
viability in Ayrshire. This
option will be reviewed as a
future option. 
Discounted Option 
5. TIMESCALES
5.1 Immediate 5.2 Phased Approach  5.3 Postpone
Similar to 2.2 and 3.3, there is
potential to develop the whole
of the i3 site immediately. This
would deliver cost savings to
the public sector but would also
increase risk and remove the
option to adapt the size/ layout
of proposed space on demand. 
Discounted Option 
Delivering the AGD investment
through a phased approach
minimises risk – this creates
flexible manufacturing space,
alongside the DPMC project, to
meet immediate demand and
allows further phases of flexible
space, based on take-up of Phase
1.
Preferred Option 
The project could be planned,
designed, costed, approved and
all relevant permissions secured
but construction postponed til
occupier interest is secured.
This option fails to meet the
current market need for good
quality business units that are
ready for occupation 
Discounted Option 
The short-list for the OBC stage is shown in the table below: 
Table 7: Assessment of Options for i3 - Short List OBC Stage
Option 1
Do Nothing 
Option 2 (Preferred)
Flexible Space, Phased  
Option 3 (Ambitious)
Flexible Space, Accelerated
Delivers no additional
floorspace
Attracts 0 occupiers
Delivers 0 gross jobs
Delivers 8,830 sqm floorspace (NIA)
Attracts 8 to 16 occupiers 
Delivers 162 net jobs 
Delivers 8,830 sqm floorspace (NIA)
Attracts 8 to 16 occupiers
Delivers 162 net jobs
Investment Level 
AGD NAC & SG £0
Other Funding £0
Investment Level 
AGD NAC £4M
AGD SG £11M
Investment Level 
AGD NAC £4M 
AGD SG £11M
Delivery Timescale 
N/A
Delivery Timescale 
(21/22) to (27/28)
Delivery Timescale 
(21/22) to (24/25) 
The conclusion of the Economic Appraisal for the OBC was that a phased delivery of the
floorspace was the preferred approach. Phase 1 was progressed as a first unit to accelerate
the programme as much as possible and was developed during the challenges of COVID. 
Whilst Option 2 - Phased Delivery was the preferred option for the OBC, Section 3 provides an
analysis of options specifically for delivering Phase 2, which is the subject of this FBC and
Appendix D provides detail on the economic modelling. The table below provides a summary of
the options considered for Phase 2 and a comparison of the options previously considered for
Phase 1. 
364

Page 365

NAC Growth and Investment 
AGD Business Case 
23
Table 8: Phase 2 and Phase 1 Options considered 
Options Comparison across phases
Options for Phase 1 Options for Phase 2
Option 1 Do nothing  Option 1 Do Nothing 
Option 2:
Preferred
Option 
Preferred Option, Deliver 18,180 sq
ft Phase 1 unit with occupancy
achieved half-way through 24/25
Option 2
Preferred
Option 
Deliver 18,180 sq ft Phase 2 unit
by June 2027, with occupancy
achieved by April 2028. 
Preferred
Option 
Sensitivity Check – Negative Impact
– assumes unit subdivided into 4
with 100% occupancy achieved in
2027/28
Preferred
Option 
Sensitivity Check – Negative
Impact – assumes unit subdivided
into 4 with 100% occupancy
achieved by March 2029.
Preferred
Option 
Sensitivity Check – Positive Impact –
assumes unit fully occupied at the
start of 24/25
Preferred
Option 
Sensitivity Check – Positive Impact
– assumes unit fully occupied by
June 2027.
Option 3 Deliver Phase 2 instead – comprised
of two sets of terraced units and
one modular unit 
Option 3
Subdivided Unit 
Deliver 17,544 sq ft unit
subdivided into 4 lettable units by
30 June 2027 with 100%
occupancy by April 2029. 
Option 4
Terraced Units 
Deliver two sets of terraced units
totaling 11,495 sq ft with 100%
occupancy by April 2029  
Option 5
Smaller Unit,
Local Regen
Fund only 
Deliver smaller single unit within
Local Regeneration Fund cost
envelope (c13,788 sq ft) by April
2027 with occupancy by Jan 2028. 
1.3.2 The procurement 
The procurement for the Phase 2 of the project involves North Ayrshire Council procuring a
contract for the build of the industrial unit and surrounding grounds. The Council is seeking
tenders through the Public Contracts Scotland (PCS) Portal for contractors to undertake the
works Riverside Way, i3 in Irvine. The Council has an available budget of £6.775M for the
project. 
The following paragraph will be updated following the tender process:
A total of xx suppliers submitted tenders and were assessed at the pre-qualification stage by
the NAC’s Corporate Procurement Team, in terms of initial pass / fail criteria and by the
service team, following which the xx suppliers proceeded to the quality evaluation stage. At
the evaluation stage the assessment was made based on 80% cost and 20% quality.
Suppliers were assessed against a number of criterion for quality. The xx suppliers then
proceeded to the commercial envelope stage where they were scored overall and a
competent bid was identified from the highest scoring contractor. 
1.3.3 Key findings and the preferred option 
The findings from the procurement for Phase 2 of the project will relate to the quality and cost
assessment of bids related to capital expenditure. The quality and commercial assessments
will identify a preferred bidder for the works and in accordance with the tender process this
supplier should be the preferred bidder based on their combined scores. 
365

Page 366

NAC Growth and Investment 
AGD Business Case 
24
1.4 Commercial case   
1.4.1 Agreed products and services
Goods and services are being sought as part of one fixed price contract for Phase 2 of the
Advanced Manufacturing Space project. This relates to the construction of an industrial unit,
its associated grounds and suds and roads infrastructure for the wider site. Tenderers will be
invited to submit tenders on a fixed price basis and will then be evaluated by North Ayrshire
Council. It should be noted that the tender remains open for a period of 150 days from the
tender return date (xx xxxxx 2026). The tender will expire on xx xxxx 2026. 
For the overall project commissioned services are likely to include the following:
• Quantity surveying
• Architecture 
• Geotechnical 
• Cost consultants 
• M&E
• Site investigation work
• Land based engineering works
• Industrial building construction company 
1.4.2 Agreed risk allocation and charging mechanism 
Risks that could affect the successful implementation of the project have been identified and
are set out in detail in the risk register attached as Appendix E. This includes details of risk
owners, risk evaluation and mitigation measures. A key risk at the moment is the uncertain
length of time to endorse and approve the FBC prior to the award of the contract within the
required timescale. 
The payment mechanism agreed with the service provider with respect to the planned
construction works will involve submission of invoices by the contractor at agreed stages of
the works, which will be certified for payment by NAC. 
1.4.3 Key contractual arrangements 
The Form of Contract for the project is the SBCC Design and Build Contract for use in
Scotland (DB/Scot), 2016 edition incorporating Amendment 1 February 2018. The key
contractual clauses are as follows: 
• Clause 4.18.1 Retention Percentage – 3%
• Clause 6.4.1 Contractors Insurance – injury to persons or property - £10,000,000
• Clause 6.5.1 Insurance – Liability of Employer - £10,000,000
• Clause 6.7 Insurance of the works – Option A applies (By Contractor)
• Clause 6.15 Contractors Designed Portion Professional Indemnity Insurance - £10M 
There are no personnel implications and TUPE does not apply. 
It would be inappropriate to incorporate contract clauses for occupiers of the completed units.
However, there is an opportunity to work with tenants to maximise impacts and benefits for local
people and local businesses through supply chains and local procurement mechanisms. 
1.4.4 Agreed implementation timescales 
The key milestones and delivery dates for the overall Phase 2 project are shown in detail in
the table below. A Delivery Assurance Implementation Plan (DAIP) was produced by the AGD
PMO in early 2026. The milestones vary slightly from the detail in the DAIP that has been
shared with Governments, following the finalisation of the tender and FBC and this is
illustrated below the first table. 
366

Page 367

NAC Growth and Investment 
AGD Business Case 
25 
Table 9: Flexible Space Phase 2, Project Milestones (working version) and comparisons to DAIP
FLEXIBLE SPACE, PHASE 2: Key Milestones  Estimated
date 
Quarter  
(financial
year)
Status
Flexible Space Outline Business Case  Approved 
Phase 1, Full Business Case granted  Approved 
Planning approval granted for Phase 2 Complete 
NAC Gate 3, Project Board, Investment Decision to tender 23 Jan 26 Q4, 25/26 Complete
NAC publish Invitation to Tender (ITT) (estimate) 06 May 26 Q1, 26/27 Not started
NAC receive tenders (estimate) 01 Jul 26 Q2, 26/27 Not started
NAC tender evaluation period ends  14 Aug 26 Q2, 26/27 Not started
Government endorse Phase 2 FBC 21 Aug 26 Q2, 26/27 Not started
NAC report FBC to Cabinet 01 Sept 26 Q2, 26/27 Not started
AEPB & AEJC approve Phase 2 FBC   11 Sept 26 Q2, 26/27 Not started
NAC award Phase 2 contract, D&B contract commences  16 Sept 26 Q2, 26/27 Not started
NAC commences marketing of the building  Sept 26 Q2, 26/27 Not started
Contractor completes construction works 22 Sept 27 Q2, 27/28 Not started
Contractor handover to NAC  22 Oct 27 Q3, 27/28 Not started
NAC sets closing date for interest and selection of tenant tbc tbc Not started
Current deadline for claiming all Local Regeneration Fund 31 Mar 28 Q4, 27/28 In progress
NAC reports Outputs/Outcomes/CWB  tbc tbc Not started
NAC delivers subsequent Phases and related FBCs.   tbc tbc Not started 
FLEXIBLE SPACE PHASE 2, 
ESTIMATED TIMELINES 
Y7 (2026/27) Y8 (2027/28) Y9 (2028/29)
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Current Delivery Assurance Imp Plan
dates
FBC           
FBC approval by June 26, Q1 
Contract award/delivery phase from Jul 26, Q2, to contract completion in Jul 27, Q2.
Updated FBC milestone dates  FBC           
FBC approval during Sept 26 in Q2
Contract award/delivery phase from Sept 26, Q2, to contract completion in Sept 27, Q2. 
1.4.5 Accountancy treatment 
It is envisaged that the assets underpinning the delivery of the service will be on the balance
sheet of the organisation should the development remain in the ownership of NAC. 
1.5 Financial case 
The financial implication of this procurement is a commitment by North Ayrshire Council, to a
contract with a maximum value within the budget available for the delivery of the Phase 2 over
the course of 2026, into 2027. The capital funds comprise of the following, within the table
below including the Local Regeneration Fund (formerly Levelling Up Funding (LUF) 3). 
Table 10: Flexible Advanced Manufacturing Space, Phase 2 - Source of Capital Funds 
Source  Amount 
North Ayrshire Council AGD contribution £355,650
Scottish Government AGD contribution  £1,713,091
Local Regeneration Fund (Levelling Up Funding (LUF) 3) £4,706,259
Total  £6,775,000
367

Page 368

NAC Growth and Investment 
AGD Business Case 
26 
1.5.1 Financial expenditure 
The majority of the financial expenditure for this procurement will take place across financial
year 2026/27 (excluding retention) and the contract is expected to be complete by mid to late
2027. 
1.5.2 Overall affordability and balance sheet treatment
The proposed works have been the subject of a best value procurement exercise. The award
of the tender will require to be signed off by the Ayrshire Economic Joint Committee, following
endorsement from NAC’s own Cabinet. The Council has ensured there are sufficient funds in
place to cover the project and will confirm following the process if the tender cost is below the
budget available. 
The table below is a current summary of the project’s financial appraisal. Proposed investment
is in phases. NAC will be responsible for ongoing maintenance and management of the
buildings through an appointed agent, until let. Anticipated rental income for Phase 2 is
£127,400 per annum. 
The project budget includes for clawback costs from Scottish Enterprise, related to the
original sale of land and change in delineation of the defined developable area, following the
decision to focus all AGD investment at Riverside Way. 
Table 11a: Flexible Space Financial Profile – Capital Expenditure 
£'000 Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30
Phase 1 5,147 34 140 217 403 2,912 1,387 53 0 0 0 0
Phase 2 6,775 0 0 0 0 51 305 132 2,068 4,220 0 0
Phase 3 8,751 0 0 0 0 0 0 0 230 3,655 4,866 0
Total 20,673 34 140 217 403 2,963 1,692 185 2,298 7,875 4,866 0 
Table 11b: Flexible Space Financial Profile – Capital Funding 
£’000 Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30
Scottish
Government 11,000       307 2,195 1,383 0 0 2,372 2,372 2,372
NAC 4,000 34 83 122 0 51 308 53 230 2,996 2,494 (2,372)
AGD Total  15,000 34 83 122 307 2,246 1,692 53 230 5,368 4,866 0
VDLF 967   56 95 97 718         
LRF 
(Prev LUF3) 4,706             132 2,068 2,507    
Project Total  20,673 34 140 217 403 2,963 1,692 185 2,298 7,875 4,866 0 
It is anticipated that the completed project will generate income from the following: 
• Ongoing rental income through the lease of completed units; and 
• Longer term, One-off capital receipts from the sale of buildings and/or
development plots. 
A draft Risk Register is included at Appendix E. The main financial risks are expected
to be:  
• Design and technical studies result in additional costs beyond the contingencies and
optimism bias allowed for;
• Slippage / delay in the programme that incurs additional costs; 
• Unforeseen project complexities that require additional funding; 
• Insufficient availability of non-financial resources for the delivery of the project;
• Risks that the key milestones are not achieved; and 
• Risk that the project does not proceed as an AGD project. 
368

Page 369

NAC Growth and Investment 
AGD Business Case 
27
1.6 Management case   
1.6.1 Project management arrangements
Phase 2 of the Flex Space Programme, which is the subject of this FBC, will be managed by
the Council’s PMI (Property Management and Investment) team and will follow the PRINCE2
methodology as much as possible. This was the approach taken for Phase 1. Project
Management responsibilities sit with PMI who have led on the development of the design on
behalf of the Growth and Investment Team who have acted as client. PMI will continue this
role as part of the delivery stage and will report to the Council’s internal Project Board for the
contract. Overall responsibility will rest with Executive Director, Place, reporting to the Chief
Executive. All personnel will be experienced and professionally qualified in their respective
roles. 
NAC has established internal governance arrangements for the management of its AGD
project(s) organised through a Project Board, which comprises of officers from Growth and
Investment, PMI, Legal and Finance. The NAC Project Board has overall authority and
responsibility for Project Delivery including the Business Case, prior to submission to the NAC
Executive Leadership Group for approval and prior to submission to the AGD Programme
Management Office (PMO). 
The Board has a Project Management responsibility but no decision-making powers. The
Project Board provides a mechanism for accountable project management delivered by
regular progress reporting and updates and coordination of any aspects of the project
associated with infrastructure, employability, business and innovation strands. 
1.6.2 Benefits Realisation and Risk Management 
The AGD PMO has produced a Benefits Realisation Plan for the AGD projects. The purpose
of the Plan is to demonstrate, to local, regional and national stakeholders, how the AGD will
capture the outputs, outcomes, impacts and community benefits resulting from Deal
investments including the Flexible Advanced Manufacturing Floorspace project at i3. It sets
out approaches to project monitoring and reporting, including definitions guidance and deal
programme and project evaluation. 
The NAC Project Board will be responsible for managing the risks and benefits realisation for
Phase 2 of the project and the remainder of the Flex Space Programme, through reporting to
the PMO and Government. Day to day management will be the responsibility of the Project
Lead and the Council’s PMI Team as Project Manager. 
1.6.3 Post project evaluation arrangements 
Project monitoring and evaluation will be managed through AGD governance arrangements to
monitor the projects outputs and outcomes. The project will be subject to regular review
meetings to discuss progress, programme, financial and technical matters. 
1.7 Recommendation 
It is recommended that the Full Business Case for Phase 2 of the Flexible Advanced
Manufacturing Space project at i3 in Irvine is approved. As the project includes Local
Regeneration Funding (formerly Levelling Up Fund Three), the Council intends to invest its
remaining AGD project funds in the third and final phase of the project programme that will be
subject to the submission of an updated version of the Full Business Case. 
369

Page 370

NAC Growth and Investment 
AGD Business Case 
28
I hereby recommend the approval of the scheme as set out in this Full Business Case to
proceed to the delivery of the scheme. 
Signed:      XX 
Date:     Date / May / 2026 
Senior Responsible Owner 
Louise Kirk, Head of Economic Development, Growth & Regeneration, NAC 
370

Page 371

NAC Growth and Investment 
AGD Business Case 
29
2. THE STRATEGIC CASE   
2.0 Introduction 
This Full Business Case is for the approval of investment in Phase 2 of the Advanced
Manufacturing Flexible Space project at i3 in Irvine. It is focussed on appointing a contractor to
construct an 18,191ft2 (1,690m2) GIFA industrial unit with yard space and supporting
infrastructure for the wider site. 
Structure and content of the document
This FBC has been prepared using the agreed standards and formats for business cases. The
approved format is the Five Case Model, which comprises the following key components: 
• strategic case section. This sets out the case for change, together with the supporting
investment objectives for the project.
• economic case section. This demonstrates that the organisation has selected the most
economically advantageous offer which best meets the existing and future needs of the
service and is likely to optimise value for money (VFM)
• commercial case section. This sets out the content of the proposed deal
• financial case section which confirms funding arrangements, affordability and the effect
on the balance sheet of the organisation
• management case section which details the plans for the successful delivery of the
scheme to cost, time and quality. 
The purpose of the strategic case is to explain and revisit how the scope of the proposed
project or scheme fits within the existing business strategies of the organisation and provides
a compelling case for change, in terms of existing and future operational needs. In this
respect, there is a growing case for the project to provide new energy efficient industrial
building stock in North Ayrshire to support the local Ayrshire economy. In addition, the project
has the potential to support the i3 DPMC Phase 2 project with complementary, supporting
advanced manufacturing space within the DPMC facility. 
The project at i3 is part of a wider strategy to modernise the Council’s commercial estate,
which has also benefited from Local Regeneration Funds from UK Government.   
To note, the Strategic Case remains the same, as set out previously within the approved
Outline Business Case of June 2021 and Full Business Case for Phase 1 of December 2022.
Key scope changes were made in relation to the scale of floorspace estimated to be delivered.
At SOC and included in the Heads of Terms, this was estimated as 150,000 square feet, at
OBC stage 97,000 square feet (approx. 9,000 square metres) was estimated and at Phase 1
FBC stage, 65,000 square feet (approx. 6,000 square metres).   
As part of the development of the Phase 1 scheme, a draft masterplan was prepared, showing
where the overall programme of space could be located at i3 and a Benefits Realisation Plan
was also prepared. Since then, the masterplan has been updated to focus flexible space
investment within a central area or cluster and around the DPMC project, as it was felt that the
original masterplan may not be achieved and the development would be fragmented with less
impact. A draft Strategic Framework was prepared to support this work.   
Ayrshire Growth Deal
The Ayrshire Growth Deal Agreement (November 2020) commits the Scottish Government
and UK Government to work collaboratively with the Ayrshire Councils and regional partners
to deliver the Ayrshire Growth Deal that will help transform the Ayrshire economy. The AGD
371

Page 372

NAC Growth and Investment 
AGD Business Case 
30
Agreement advises the following regarding i3 projects including the Flexible Space
programme: 
Both Governments and North Ayrshire Council, will support new developments at the i3 Irvine
Enterprise Area Advanced Manufacturing Space in Irvine, which will create a National Digital
Processing Industry Hub and advanced manufacturing flexible space.  This will serve digital
processing industries, building on current Life Science Clustering at the site, and facilitate
R&D activity, start up, spin out, and growth of Life Science businesses and other advanced
manufacturing opportunities. This will see investment of up to £11 million from the Scottish
Government, £6.225 million from the UK Government, and £5 million from North Ayrshire
Council. The National Digital Processing Industry Hub will be developed at i3 with links to the
National Manufacturing Institute Scotland in partnership with Strathclyde University and
industry. The project also includes construction of flexible business space capable of meeting
the requirements of Chemical and Life Sciences manufacturing, Digital Automation and other
advanced manufacturing opportunities. The combined offer at i3, centred round the National
Digital Processing Industry Hub, will attract a range of supply chain and digital technology
SMEs and start-ups and offer strategic capacity to secure major digital process sector
investment at i3. 
Part A: the strategic context 
2.1 Organisational overview 
North Ayrshire Council is delivering Phase 2 of the project and a final third phase and is
seeking other funding support to help deliver as much advanced manufacturing floorspace as
possible, including the Local Regeneration Fund (formerly LUF3). The Council has led on the
following areas of work to progress the project:
• Masterplanning for i3, including planning, masterplanning and conceptual development of
future i3 flexible space and DPMC;
• Targeting Vacant and Derelict Land funding allocations to help support the project; 
• Funding bids to improve the Council’s commercial space for businesses e.g. Local
Regeneration Fund (formerly LUF3); 
• Land assembly in conjunction with Scottish Enterprise to create a cluster of development
within a central area of i3;
• Project management of the design and development of Phase 1 and Phase 2 of the
project and an updated masterplan for the site, by NAC’s architects and surveyors;
• Active travel proposals to improve connections between i3 and Irvine; 
• Securing community benefits outcomes from the Growth Deal projects, aligning with the
Council’s Community Wealth Building Strategy; and  
• Working with East and South Ayrshire teams to develop a collaborative approach to
regional working in Ayrshire in relation to commercial space. 
This will work will complement the DPMC i3 project which is in partnership with University of
Strathclyde, NMIS and CPI. NAC is acting as an enabler and facilitator for the project, using
the Ayrshire Growth Deal investment as a catalyst. 
2.2 Business strategies 
The purpose of the project aligns across a breadth of local, regional, national and UK policies.
Summaries of relevant plans, policies and strategies have been outlined in the tables below. 
372

Page 373

NAC Growth and Investment 
AGD Business Case 
31
2.2.1 Strategic policy context
The broad policy framework is summarised with additional supporting information on specific
policies. The following table provides an overview of relevant policies and strategies. 
Table 12: National Policy and Strategies
National Policy and Strategies 
Policy Objectives Relevance for i3 Project 
The UK’s Modern
Industrial
Strategy 2025
• Position the UK as a leading destination for
investment and innovation
• Increase business investment and provide stability
for long-term investment decisions
• Focus on eight High-Growth Sectors including
Advanced Manufacturing, Digital & Technologies and
Life Sciences with individual sector plans. 
• Using innovation to drive
productivity and high-quality
employment
• A focus on supporting sectors
with high-growth potential, with
Advanced Manufacturing
identified as a key sector. 
UK Life Sciences
Sector Plan 2025
• To support world-class research and development,
attract investment, grow advanced manufacturing,
and accelerate health innovation
• To position the UK as the leading life sciences
economy in Europe by 2030
• Creation of Life Sciences Innovative Manufacturing
Fund (LSIMF) to bring globally mobile manufacturing
investments to the UK
• A commitment to partnering with industry to drive
growth and innovation. 
• The project supports the Life
Sciences Sector Plan by providing
flexible business space capable of
meeting manufacturing
requirements for chemical and life
sciences
Levelling Up the
UK: Executive
Summary 
• Providing a catalyst for delivering a long-term
programme of change to unlock the potential of
people and places in every part of the UK - creating
jobs, driving productivity, improving people’s quality
of life and helping restore pride in places. 
• i3 benefiting from £4.706M
towards commercial space and
funding towards low carbon
infrastructure through the Local
Regeneration Fund (formerly
LUF3).
Scotland’s
National Strategy
for Economic
Transformation,
2022 to 2032
• Identifies five programmes to drive improvements in
Scotland’s economy over the next 10 years –
stimulating entrepreneurship, opening new markets,
increasing productivity, developing skills required for
the next decade and ensuring fairer and more equal
economic opportunities
• The project will support
improvements in the local
economy by providing modern
business space to attract inward
investment and help local
companies grow and expand.
Programme for
Government,
2024 to 2025
Serving Scotland
• 4 Key Priorities including Growing the Economy • The Flexible Space Programme
will provide a source of
employment to communities. 
National Planning
Framework 4,
2023
• Supporting business and industrial development
whilst safeguarding and enhancing the natural and
built environment. 
• The project supports the creation
of high quality, modern, energy
efficient, well-designed business
space as part of a new industrial
cluster. 
National
Innovation
Strategy, 2023-33
• Sets out a vision and road map to transform
Scotland’s economy over the next decade by placing
innovation at the heart of economic growth, societal
prosperity and wellbeing with four key priorities
including growing the economy. 
• The project will seek to supported
economic growth by providing
modern space for businesses to
expand and grow. 
Shaping
Scotland’s
Economy: Inward
Investment Plan
2020
• The Plan focuses efforts on nine areas of opportunity
where Scotland has global strengths.
• The Plan acknowledges that the Covid-19 crisis has
placed digital at the forefront of the response and
subsequent recovery steps across the private, public
and third sectors 
• Key role to grow Scotland’s manufacturing sector,
strengthen supply chain linkages and increase
productivity using advanced manufacturing
• Giving priority to investors who
can build local supply chains,
provide new skills and invest in
research.
• Nine priorities and three themes
underpin Inward Investment. 3
themes all applicable to i3 are:
Digital / High Value Manufacturing
/ Net Zero.
373

Page 374

NAC Growth and Investment 
AGD Business Case 
32
National Policy and Strategies 
Policy Objectives Relevance for i3 Project 
technologies such as automation, AI and digital
manufacturing techniques
A Manufacturing
Future for
Scotland, 2016
• Innovative manufacturing and utilisation of leading
edge technologies, driving competitive advantage
• Co-ordinating national innovation resources and
assets to be appropriate for manufacturing base
• Creating an environment where businesses of all
sizes, in all manufacturing sectors can innovate and
adopt new novel technologies
• Linking up with NMIS and other
centres of excellence
• Enabling collaboration between
businesses, RTOs & academia by
providing a focal point and
promoting an open innovation
ethos
Making
Scotland's Future
– A Recovery
Plan for
Manufacturing &
related
Programme, 21
• Co-ordinating national innovation resources and
assets to be appropriate for the manufacturing base
• Creating an environment where businesses of all
sizes and in all manufacturing sectors can innovate
and adopt new novel technologies
• Encouraging and supporting our manufacturing
businesses to put investment in the best available
technologies at the core of their business going
forward. 
• Work with Innovate UK to align interventions and
promote opportunities around digital for
manufacturing, driving manufacturing readiness and
stimulating innovation to uncover new sources of
revenue from manufacturing.
• Linking up with NMIS and other
centres of excellence
• Enabling collaboration between
businesses, RTOs and academia by
providing a focal point and
promoting an open innovation
ethos
• Co-ordinating national innovation
resources and assets to be
appropriate for the manufacturing
base. In particular, interaction
with both new and existing
centres of excellence will provide
an environment where innovation
and demonstration opportunities
can be developed.
Scotland’s 2018
to 2032 Climate
Change Plan,
Updated 2020
• Sets out Scotland’s Ambitions to reduce carbon
emissions and achieve net zero emissions by 2045,
set by the Climate Change Act 2019
• The project will contribute
through the provision of modern
and energy efficient commercial
space built on vacant and derelict
land at i3. 
Life and Chemical
Sciences
Manufacturing
Strategy for
Scotland
• Establishing a strong platform for manufacturing
growth through strong communication between the
Life and Chemical Sciences sectors
• Improving the translation of research into application
• Strengthening UK’s case (including supply chains) for
manufacturing businesses
• Enabling commercialisation of
research by providing a focal point
between academia and industry
• Building up service offering at i3
to attract businesses
Skills &
Investment Plan
for Scotland’s Life
and Chemical
Sciences
• Four priority areas: addressing specific skill
shortages, ensuring national coverage of skills and
training provision, increasing exposure to, and
understanding of, industry, enhancing practical
experience
• Developing Scotland’s life and
chemical sciences capability
• Encouraging engagement
between HE/FE and industry 
Life Sciences
Strategy for
Scotland 2025,
Vision
• Making Scotland the location of choice for Life
Sciences businesses, researchers, healthcare
professionals and investors while increasing Life
Sciences contribution to Scotland’s economic growth
• Four key priority areas: business environment,
innovation & commercialisation, internationalisation,
and sustainable production
• Developing Scotland’s life
sciences capability
• Linking with the Life Sciences
Innovation Centres.
Chemical
Sciences Scotland
Strategic Plan
2025
• Establishing Scotland as a world class centre of high
value manufacturing as well as delivering a skill
investment plan to provide easy access to training
and education to support the growth of the chemical
sciences sector
• The project will provide
opportunities for the sector to
locate to i3, in close proximity to
the DPMC project. 
A changing
nation: how
Scotland will
thrive in a digital
world 
• To create a strong digital economy for Scotland
which supports businesses to adapt and be successful
• Create conditions for technology businesses to grow,
thrive, create jobs and attract investment  
• Support for focus on digital
automation at i3 as part of wider
AGD project 
374

Page 375

NAC Growth and Investment 
AGD Business Case 
33
National Policy and Strategies 
Policy Objectives Relevance for i3 Project 
Green Data
Centres and
Digital
Connectivity
Vision and Action
Plan, 2021
• attract new investors that require high-speed data
transit to locate in Scotland and take advantage of
enhanced terrestrial and international fibre
connectivity
• build on its capacity to generate energy from
renewable sources
• ensure that the full economic and social potential of
technologies, such as 5G, Internet of Things (IoT) and
Artificial Intelligence (AI), are realised across all parts
of Scotland
• improve Scottish competitiveness and internet
resilience providing direct links to other countries
and markets
• Potential for i3 to accommodate
such development and build on
opportunities arising from the
subsea cable AGD project 
Shortlist for Data
Centre Site
Selection in
Scotland, 2021
• Joint study by Scottish Futures Trust/Host in
Scotland, Crown Estate Scotland and Scottish
Enterprise, emerging from Green Data Centres and
Digital Connectivity Vision and Action Plan. Providing
an overview of potential data centre locations in
Scotland. 
• Identifies i3, Irvine as one of 10
sites in Scotland where such
development could be
accommodated 
Of specific relevance is the overall project’s relationship to the UK Industrial Strategy 2025 and
Scotland’s National Strategy for Economic Transformation, which are mapped out below. 
Table 13: Project’s Relationship to UK’s Modern Industrial Strategy 
The UK’s MODERN INDUSTRIAL STRATEGY 2025
Relationship to i3 Advanced Manufacturing Space Project 
Key Related Objectives
Prioritise
Business
Investment
Focus on
High-Growth
Sectors
Infrastructure
and Energy
Skills and
Talent
Innovation
and R&D
Net zero
Transition
Regional
Economic
Growth
Providing
certainty and
stability for
long-term
decisions.
Sectors include
Advance
Manufacturing,
Digital &
Technologies
and Life
Sciences
Reduce energy
costs and grid
connection
times
Reform skills
& employment
support
system and
increase
technology
training for
engineering,
digital and
defence
Targeted
investment
into R&D,
leveraging
private
investment
Support
decarbonisation
and a transition
to net zero
Increased
support for
regional
innovation
and creation
of high
quality
employment 
Table 14: Project’s Relationship to Scotland’s National Strategy for Economic Transformation  
SCOTLAND’S NATIONAL STRATEGY FOR ECONOMIC TRANSFORMATION 2022-2032
Relationship to i3 Advanced Manufacturing Space Project
Key Related Objectives  
Entrepreneurial
People and
Culture
New Market
Opportunities
Productive
Businesses and
Regions
Skilled Workforce A Fairer and More
Equal Society
Supporting business
start-ups and building
a culture of
innovation 
Attract inward
investment,
generating good
quality jobs from a
just transition to net
zero
Improving business
efficiency and
productivity and
supporting digital
innovation
Upskill the workforce
to meet emerging
economic needs
Promoting fair work and
increasing employment
and wage growth to
reduce poverty and
improve outcomes for
disadvantaged people
and places
375

Page 376

NAC Growth and Investment 
AGD Business Case 
34
2.3 Other organisational strategies 
2.3.1 AGD Programme 
The AGD programme links to Governments’ objectives of increased growth and prosperity.
Post the development of NAC’s Strategic Outline Case, NAC has been working closely with
the other Ayrshire Councils regarding the complementarity of projects and has coordinated
activity though the Ayrshire Growth Deal Leadership Group and Project Management Office
(PMO). Appendix F provides an initial analysis of inclusive growth objectives for the project.
The key themes identified as being critical to economic recovery and renewal are: 
Advanced Manufacturing   Aerospace/space Clean Growth
Community Wealth Building  Food & Drink Life Sciences
Visitor Economy  Business  Connectivity
Digital   Innovation  Skills 
The development of detailed actions and subsequent delivery of themes is framed through a
Community Wealth Building approach that seeks to harness assets, resources, community
strength and relationships within Ayrshire to deliver improved outcomes for our communities. 
2.3.2 Regional Policy Context 
The Flexible Space Advanced Manufacturing project has the potential to support two of North
Ayrshire’s economic development objectives: creating employment opportunities and
positioning the area as a leading location for business within the Glasgow city region. 
The project has the potential to deliver against the policy objectives of key strategies set out at
both the Scottish and regional levels. The Ayrshire Regional Economic Strategy was
developed in 2023 and outlines a ten-year economic vision for Ayrshire, providing regional
context for this project. The proposition is also in line with the Scottish Government’s inclusive
growth agenda, targeting regional imbalances in economic activity. The key messages from
these strategies are outlined below. 
Most recently North and East Ayrshire Councils have taken the decision to progress with the
development of a shared Economic Development Service commencing during 2026/27 which
will include the Ayrshire Growth Deal delivery teams from both Councils. 
The overall aim is to deliver greatly enhanced outcomes through: enhanced strategic
leadership, shared resources, enhanced collaborative arrangements, economies of scale,
greater access to specialist skills and expertise, enhanced capacity, and strengthened service
resilience, together with simplification, standardisation, upskilling and best practice sharing. 
Table 15: Regional & Local Policy & Strategies 
Regional and Local Policy and Strategies 
Policy Objectives Relevance for i3 Project 
Ayrshire Growth
Deal Heads of
Terms and
Agreement
• Focus on aerospace, space and life sciences, as well as
building on Ayrshire’s existing strengths in food and
drink, tourism, manufacturing and engineering
• Driving inclusive economic growth through creation of
new high-quality jobs and opportunities 
• Building Digital Capital – replacing the Digital
Infrastructure and Subsea Cable projects to provide
modern digital infrastructure across Ayrshire,
including over £4M for North Ayrshire. 
• Linking in with the digital
infrastructure agenda
• Possible links with the
sustainability agenda
• In partnership with Strathclyde
University and industry, a Digital
Hub facility will be developed at
i3 to incorporate relevant
testing/ R&D equipment and
specialist staff
376

Page 377

NAC Growth and Investment 
AGD Business Case 
35
Regional and Local Policy and Strategies 
Policy Objectives Relevance for i3 Project 
NAC Local
Development Plan
2 and emerging
LDP3
• Safeguards key business & industrial sites
• Identifies ways to support areas for specific new
residential development to cross fund new or
improved employment space
• i3 is identified as a strategic
business location, including
opportunities for a large single
user or major multiple
investments, as well as a high
amenity business park
NAC Council Plan
–2023-2028
• A key priority of the Council Plan is a transition to a
wellbeing economy which delivers inclusive economic
opportunities, prosperity and enhanced wellbeing for
North Ayrshire. This includes developing infrastructure
to support business growth.
• The i3 project would strongly
support these priority outcomes. 
Sustainable North
Ayrshire Strategy
2024-2027 
•  Setting out targets and priorities to achieve net zero
carbon emissions, halt biodiversity loss and be Nature
Positive by 2030 
• i3 has the potential to support the
strategy by ensuring this project
seeks to provide developments
that generate minimum carbon. 
North Ayrshire
Community
Wealth Building
Strategy 2024-
2027 
• To create an inclusive and wellbeing economy for
North Ayrshire that delivers social, economic and
environmental justice for all 
• Working in partnership with communities and
businesses, the economic levers of Anchor
Institutions are used to support and improve the
local economy and create more benefits for the area. 
• Working within localities to
facilitate place-based Community
Wealth Building activities on
procurement, employment, assets
and ownership. 
• Promote Fair Work practices and
position Ayrshire as a Fair Work
region.
LOIP – Irvine
Locality Action
Plan 2023/24 
The Irvine Locality Partnership has identified their key
priorities as:
• Supporting Skills and Work Opportunities
• Enhancing our Mental Health and Wellbeing
• Alleviating Poverty
• Championing Green Health and the Natural
Environment
• The i3 project will support the
Partnerships priority of
Supporting Skills and Work
Opportunities 
Ayrshire Regional
Economic Strategy
2023-2033
The Regional Economic Strategy for Ayrshire outlines a ten-
year economic vision for Ayrshire, identifying six priority
themes: 
• Support for enterprise
• Fair work
• Innovation
• Good health and wellbeing
• Stronger places and communities
• Enhancing natural capital
• i3 is identified within the strategy
as a site with significant growth
opportunity 
The i3 Advanced Manufacturing Space project fits with these strategies through: 
• supporting the growth of key sectors to build competitive advantage & economic
contribution;
• enabling sector growth by addressing a critical market failure in the provision of high
quality modern business sites and premises to attract and retain business activity;
• creating quality jobs and economic value (GVA), and supporting Community Wealth
Building by filtering through the rest of the economy via sector supply-chain activity;
• enhancing Scotland’s reputation as a key location for life sciences, and attracting
manufacturing activity based on embedded skills and expertise of Ayrshire’s workforce;
• making best use of existing embedded infrastructure assets and investments at i3; 
• positioning i3 as a key strategic location within the Glasgow City Region, providing
opportunities for major investment;
• providing high quality development space and opportunities, set within a highly
competitive infrastructure and quality environment;
• supporting the two overarching goals for economic development in North Ayrshire –
becoming a leading location for doing business – and creating quality, inclusive
377

Page 378

NAC Growth and Investment 
AGD Business Case 
36
employment opportunities (and multiplier benefits) that will help to reduce worklessness
and inequality;
• delivering economic impacts and outcomes spread across Ayrshire (and beyond) and
contributing to business and job growth targets, through direct and indirect/induced supply
chain linkages; and
• delivering a completed development that meets the LDP site designation for business and
industrial use. 
In summary, as demonstrated, there is a good strategic rationale for the i3 project. It
contributes to the aims, objectives and aspirations of the AGD, and of key Government
strategies linked to industry and achieving a low carbon, inclusive economy. The successful
marketing and letting of Phase 1 of the project (4A Riverside Way), has demonstrated demand
for the project. 
Part B: the case for change 
2.4 Investment objectives 
Investment objectives for the i3 Flexible Advanced Manufacturing Space project were set out
within the OBC and Phase 1 FBC as follows: 
Table 16: Flexible Space Investment Objectives 
Investment Objective 1 
To create flexible business space capable of meeting manufacturing requirements for
chemical and life sciences, but also for a wide range of other high value sectors.
AGD investment will overcome market failure barriers and deliver 65,000 square feet of
high-quality business by 2030. 
Investment Objective 2 
To complement planned AGD investment in a Digital Hub and related services at i3 and the
proposed new National Manufacturing Institute Scotland (NMIS) development.
AGD investment will provide a new focus for modern industry at i3 and for Ayrshire. In
particular, the proposed Digital Hub has the potential to operate as a satellite of NMIS,
focussing on specialised sectors. 
Investment Objective 3 
To create serviced industrial land capable of immediate development.
AGD investment will make best value use of a key asset by enabling prime industrial land to
be developed by 2030.   
Investment Objective 4 
To attract mobile investment both from abroad and from indigenous companies.
AGD investment will meet identified market opportunities for mobile investment and could
accommodate between 8 to 16 companies at i3 by 2030. 
Investment Objective 5 
To create opportunities for employment and inclusive growth with particular emphasis on
making connections to local communities, schools and colleges in preparation for
employment.
AGD investment will create floorspace that will accommodate 162 net jobs by 2031.
Through the wider AGD project activity, businesses will be engaged in activities that seek to
378

Page 379

NAC Growth and Investment 
AGD Business Case 
37
maximise opportunities for local people and local people will be engaged to ensure they
have the skills, qualifications and aspirations to take advantage of these opportunities. 
Investment Objective 5 
To create a sustainable, high quality business location capable of meeting and keeping pace
with the changing demands of high value manufacturing sectors. 
AGD Investment will remove a market constraint and create modern and flexible business
accommodation that will be attractive to occupiers long into the future. 
Since the approval of the OBC it has been identified that the project will now deliver
approximately 65,000 square feet of business space and the pilot of the Digital Process
Manufacturing Centre (DPMC) referred to in Objective 2, is now delivered and operated by
National Manufacturing Institute Scotland (NMIS), at i3, hosted by engineering company Booth
Welsh. 
2.4.1 Strategic need 
A number of studies were commissioned to inform the development of the i3 AGD projects.
These studies highlighted the key strengths of the local economy in terms of manufacturing
activity (particularly around life sciences and engineering), industrial heritage, the role of
international businesses, key infrastructure assets and proximity to Glasgow. However, it is
well recognised that the area is underperforming economically and has some serious
challenges around depopulation, productivity, economic growth rates, skills levels and lack of
fit for purpose modern business space. 
The priority for the i3 project is to build on the area’s key strengths and help to address these
longer-term challenges. Through the Growth Deal, partners are looking to support
‘transformational’ and ‘catalytic’ projects that can change perceptions and turn around the
long-term economic performance of the area. 
The advanced manufacturing space proposed will complement the DPMC and provide
modern space in a number of phases.  While separate business cases, the two are linked, as
the DPMC project is helping to raise the profile of i3 and to encourage business investment
and growth, with a focus on Industry 4.0. The proposed investments are part of a strategy for
i3 that allows: 
• The central Riverside Way area to be developed as a central area for i3, including the
proposed flexible space and DPMC pilot, with the potential for a second, permanent
DPMC Phase 2, enable through the AGD and subject to Full Business Case
development and approval;
• The large Strategic Investment Campus (SIC) which was marketed for major inward
investment as a separate development and is currently in the process of being sold. 
The previously referred to Digital Outline Business Case which considered investment
towards a subsea fibre optic cable and associated infrastructure, with opportunities for Irvine
as a potential landing point, could not progress as the commercial case was not viable. A
new programme and related business case – Building Digital Capital, is now being taken
forward with workstreams across the three Ayrshire authorities. North Ayrshire holds a
budget of £4.631M with initial focus on progressing the delivery of infrastructure, adoption,
skills and intelligence. This will include consideration of digital infrastructure that can support
development at i3. The project is currently in development. This would build on the
separately funded UK Government 5G Innovation Regions investment. 
Whilst it had been anticipated that the proposed subsea fibre optic cable would help attract
379

Page 380

NAC Growth and Investment 
AGD Business Case 
38
global businesses and enable the potential creation of a datacentre cluster of national
significance there has been significant interest in data centre development at i3 in relation to
the large Strategic Investment Campus. 
The Heat Map at Appendix A illustrates the strengths of relationships between the AGD
projects and the i3 project. 
2.5 Existing arrangements 
Presently there are no existing arrangements in place to support the supply of new industrial
property in North Ayrshire and Ayrshire, in order to meet the demand from local companies
and potential inward investment companies. This is due to prolonged market failure within the
area making it unviable for the private sector to deliver such development. 
Our strategic objective is to create jobs and bring economic activity to Ayrshire. In order to do
this, we need to improve the offer that we can make to investors by providing well-serviced
development sites and business space that is ready for occupation. 
2.6 Business needs 
AGD funding is required in order to meet demand for modern industrial accommodation in
the face of acute market failure. This is preventing private sector investment in speculative
industrial development across Ayrshire and most non-prime locations in Scotland. Studies
commissioned by NAC have identified the following issues that demonstrate the requirement
for investment and the creation of new modern business space as a priority for the Council.
This was set out within the project’s Outline Business Case and Phase 1 Full Business Case
and has been reaffirmed by more recent reviews by property consultant Ryden. 
• High demand for industrial space;
• Low vacancy rates for industrial space of less than 1% for Irvine, 2.4% for North
Ayrshire and 4.4% for West Central Scotland (among the lowest in the UK); 
(These figures were previously 4.5% for Irvine, 4.5% for North Ayrshire and 3.4% for West of
Scotland at Phase 1 FBC stage and 4%, 6% and 4% respectively at OBC stage)
• Insufficient rental values to support financially viable, new-build speculative
development;
• Very limited funding sources available for the public sector to intervene; 
• Constraints on indigenous companies seeking to grow and expand within North
Ayrshire; 
• Constraints on attracting inward investment through lack of modern premises; 
• Ageing building stock of existing industrial premises that is facing obsolescence; 
• Constraints due to companies being less accessible to disabled or mobility impaired
job seekers / trainees; and 
• Growing pressure through changes in legislation and customer demand, to create
better configured, more energy efficient building stock and eliminate hazardous
building materials. 
A more recent update by Ryden in February 2026 has confirmed this as an ongoing issue for
the area.   
380

Page 381

NAC Growth and Investment 
AGD Business Case 
39 
Figure 11: Phase 1, Flex Space (4A Riverside Way, front & rear elevations 
2.6.1 Property market assessment  
Property market consultants assessed and reviewed the potential to invest in new industrial
and office property at i3 through the AGD funds for the OBC and FBC. This included
assessment of supply and demand in North Ayrshire. An updated survey was done in
February 2026 which re-confirmed this as an ongoing significant issue for the local industrial
property market with vacancy levels being even lower for Irvine and North Ayrshire, with a
slight 1% increase for West Central Scotland. However, whilst there is significant demand, the
report highlights that rental values are insufficient to support financially viable, new build
speculative industrial and office development. 
2.7 Potential business scope and key service requirements 
The project will seek to address the business needs set out in section 2.6 by providing a range
of types of industrial space across the Flexible Space Programme. The proposed units will be
as flexible as possible in their design. Phase 1 was designed with the potential to be
subdivided to a maximum of four units, to easily accommodate a rear extension and the
installation of a mezzanine level. The new tenant has recently taken occupation and has
submitted a planning application for an extension and plans to instal a mezzanine level, taking
full advantage of the flexible features of the building and its plot. 
It has already been highlighted at Phase 1 FBC stage, that the project scope has been
impacted upon by increased costs, affecting the amount of floorspace that can be delivered,
reducing from 9,000 square metres to around 6,000 square metres. Additional funds secured
from the Local Regeneration Fund (formerly LUF 3) will help maintain this revised cost in the
face of further cost increases. 
The project is seeking to attract a wide variety of occupiers, including local SMEs and inward
investors including opportunities through the location of the Digital Processing Manufacturing
Centre (DPMC) in close proximity at i3. Phase 1 has enabled the adjoining business Barony,
to extend their production line and create approximately 50 new jobs as a result of them
securing the lease for the building. 
A refreshed masterplan has been developed to show the proposed location and scale of
development within a central area of i3 with Riverside Way to the south, Long Drive to the
east, A71 to the north and industrial premises to the west. This will create a cluster area with
the proposed DPMC. Previously, it was anticipated that a small number of units could also be
381

Page 382

NAC Growth and Investment 
AGD Business Case 
40
located at the large Strategic Investment Campus (major inward investment site), however
given the increase in construction costs and reduction in floorspace that could be achieved, it
was decided that the focus of investment should be within a central area. 
Figure 6: Proposed Phases of Flexible Space Programme 
2.8 Main benefits criteria 
This section describes the main outcomes and benefits associated with the implementation of
the potential scope in relation to business needs. These are set out in the table below. In
addition, a Benefits Realisation Plan was prepared for the project, and a Benefits Realisation
Logic Chain is included in Appendix C. 
Table 17: Investment Objectives and Stakeholder Benefits 
Objectives Benefits for Stakeholder Groups 
1. To create flexible business space
capable of meeting manufacturing
requirements for chemical and life
sciences, but also for a wide range
of other high value sectors.
• New business units will be occupied by Ayrshire/ Scottish/ UK/
overseas businesses
• Created/safeguarded jobs will generate economic value – jobs, GVA,
turnover for Ayrshire and Scotland
• Supply chain outcomes will be created for other Ayrshire and Scottish
businesses
• Design and construction contracts will generate turnover for Ayrshire
and Scottish contractors
• Construction jobs and training outcomes will be created ,primarily for
Ayrshire people and particularly drawn from disadvantaged or Protected
Characteristic groups. 
2. Create a centre of digital
innovation which offers digital
tools, support and innovation
scaled to a national market
• University and College presence at i3 offering training and business
development opportunities.
• Cluster of R&D and spin off opportunities
• Providing employment, skills development, community wealth building
382

Page 383

NAC Growth and Investment 
AGD Business Case 
41
Objectives Benefits for Stakeholder Groups 
supporting a restructure of the
regional economy to deliver
advanced manufacturing. 
and supply chain growth opportunities
• Providing the private sector with opportunities for upskilling, business
transformation and increased productivity 
3. To create serviced industrial land
and capable of immediate
development.
• Development plot will be available for indigenous Ayrshire/ Scottish, UK-
owned and foreign investors
• Design and construction contracts will generate turnover and jobs for
Ayrshire and Scotland
4. To create opportunities for
employment and inclusive growth
with particular emphasis on
making connections to local
communities, schools and colleges
in preparation for employment,
particularly in areas of deprivation.
• New employment outcomes – direct and indirect through supply
chains
• Work experience and training places for school and college students
• Job market entrants and low skilled workers increasing soft and basic
skills through provision of local jobs. 
• Residents of deprived areas gaining access to opportunities 
• University presence enabling additional educational and training
opportunities 
• Delivery of enhanced public transport connection that opens up
employment opportunities
5. To attract mobile and private
sector investment both from
abroad and from indigenous
companies.
• New employment and training outcomes
• Demonstrate attractiveness of Scotland as excellent location for life
sciences manufacturing
• Increased investment confidence 
6. To create a sustainable, high
quality business location and R&D
cluster, capable of meeting and
keeping pace with the changing
demands of high value
manufacturing sectors and
complementing national initiatives
including NMIS. 
• Enhancement and maintenance of attractiveness of Ayrshire as a
location, meeting modern business needs and promoting Industry 4.0
services. 
• Large, visible and modern development that clearly shows Ayrshire is
Open for Business
• Recognised as part of a national strategy for improving digital
technology 
2.9 Main risks 
The main business and service risks associated with the potential scope for this project are
shown in the table below together with their counter measures. A number of these risks are
included as main risks in the most recent Ayrshire Growth Deal Implementation Plan, and
these have been highlighted in the Risk Ref column as (IP). The risk register is included in
Appendix E and listed in Table 18 below. 
The likely increase in costs from the indicative costs included in the approved OBC were
reported to the PMO and Scottish Government at Phase 1 FBC stage, on the basis that that
project was unlikely to deliver the amount of business space set out in the OBC. It was agreed
that Phase 1 of the project should progress to tender stage to test the construction market,
with the outcome that Phase 1 could proceed. In addition, the Council sought Levelling Up
Funding to help mitigate this issue for Phase 2. The tender opportunity for Phase 2 will be
published in May and an updated version of the FBC will report whether the tenders have
come in within the budget available which will enable Phase 2 to progress. 
The risks are based on the following assessment / scores:  
Green   0 - 3
Amber / Green   4 - 9
Amber / Red   10 - 14
Red   15 - 25 
383

Page 384

NAC Growth and Investment 
AGD Business Case 
42
Table 18: Flexible Advanced Manufacturing Space – Project Risks, Updated  
Ref  Category Risk Description Impact Likeli-
hood
RAG Mitigating Actions
I3FL-R01
(IP)
SCOPE
Outputs &
Outcomes 
Anticipated
outputs and
outcomes are not
delivered.
3 3 9 Ensure BC addresses sensitivity of
outcomes 
Clear Evaluation & Monitoring
Framework 
Maximise outcomes through project
suppliers. 
I3FL-R02 QUALITY 
Outputs &
Outcomes 
The project fails to
achieve more
inclusive growth
and/or reduce
poverty by
increasing the
income of people
in deprived areas
or protected
characteristic
groups
3 5 15 Benefits Realisation Plan prepared to
identify targets. 
I3FL-R03 SCHEDULE
Timescales /
Programme 
Delays to overall
project programme
and key milestones
3 3 9 Prepare a detailed project
programme with considered time
allowances and review regularly.  
I3FL-R04
(IP)
SCHEDULE 
Timescales /
Procurement 
Delays to the
submission or
approval of
business cases or
the progress of
tender
procurement,
causes delays to
the award of
contracts for flex
space and the
progress or
claiming AGD
spend or the Local
Regeneration
Fund.
4 3 12 Seek early agreement on appropriate
procurement routes 
Include anticipated tender packages
within the Council’s Procurement
Wave Plan 
Spend aligned against related
funding source deadlines 
Ensure sufficient timeline allocated
to evaluation tender
Ensure response, evaluation and
governance process programme to
enable swift progress to award
I3FL-R05 Timescales /
Environment
Delays caused by
environmental
considerations
3 5 15 Protected Species/Habitat risk has
been assessed at an early stage. 
Review of site studies required at key
stages. 
Ensure seasonal work/study
requirements are accounted for in
programme.  
I3FL-R06 Timescales /
Environment 
Delays caused by
site investigation
work and findings
3 5 15 Instruct SI work at early stage of
project   
I3FL-R07 Timescales /
Regulatory 
Delays caused by
objections
2 4 8 Advance programme of local &
stakeholder engagement.  
I3FL-R08
(IP)
SCHEDULE
Timescales /
Regulatory  
Delays caused by
statutory consent
processes
3 2 6 Zoned & allocated site 
384

Page 385

NAC Growth and Investment 
AGD Business Case 
43
Ref  Category Risk Description Impact Likeli-
hood
RAG Mitigating Actions
Pre-App discussion with NAC
Planning Assess protected
species/habitat risk at early stage
Review planning challenge/appeals
Agree programme for consents 
Advance programme of local
stakeholder engagement  
I3FL-R09
(IP)
SCHEDULE
Timescales /
Regulatory 
Delays caused by
land assembly /
lease agreement
processes.
2 2 4 Early engagement with owners. 
Ensure programme allows for third
party approvals.
Phase 3 layout has been developed
to reduce requirement for private
land.   
I3FL-R10
(IP)
SCHEDULE
Timescale /
Contractor
Delays during
project
construction
phases.
3 3 9 Regular monitoring through site
meetings and reports 
Ensure emphasis through
programme analysis and approach
included in tender documentation
and evaluation. 
I3FL-R11
(IP)
INTERNAL
RESOURCES
Timescale /
Business /
Professional
Staff resources not
sufficient to
manage projects as
they develop.
3 2 6 Risk has reduced as vacant post has
been filled, although impact has
been significant on pushing out
delivery timelines for projects.  
I3FL-R12 Regulatory  Planning/building
warrants are not
granted.
2 5 10 LDP supports development of site for
this use. Ensure local members
briefed/updated on project. 
Hold pre-app discussion with NAC
Planning Assess Protected
Species/Habitat risk 
Formally agree programme for
consents 
Advance programme of stakeholder
engagement  
I3FL-R13
(IP)
EXTERNAL
Regulatory 
Compliance with
Subsidy
regulations.
1 2 3 Regular monitoring and if required,
contact with Subsidy Unit to ensure
no specific risks arising related to
subsidy, due to nature of the project.  
I3FL-R14 Financial  Design and
technical studies
result in additional
costs beyond the
contingencies and
optimism bias
allowed for.
3 4 12 Develop and validate project briefs
and specifications for each phase
Benchmark costs. 
Ensure early infrastructure cost
tested and informed by SI work. 
Provide Optimism Bias allowances
compliant with Green Book
Provide for contingency & inflation.  
I3FL-R15 Financial  Slippage / delay in
the programme
incurs additional
costs.
3 5 15 Instruct appointed project team to
address this within Risk Register. 
Selected procurement route will
seek to ensure contract type has less
risk for client.  
385

Page 386

NAC Growth and Investment 
AGD Business Case 
44
Ref  Category Risk Description Impact Likeli-
hood
RAG Mitigating Actions
I3FL-R16  Financial  There are
unforeseen project
complexities that
require additional
funding.
2 4 8 Provide for contingency 
Provide Green Book compliant
Optimism Bias allowances. 
Similar project has been delivered
previously.  
I3FL-R17  Financial  Rental income
lower than forecast
2 3 6 Market review and comparator
analysis to identify appropriate rent
but ultimately down to actual market
demand on completion  
I3FL-R18 Financial  Lack of budget to
support interested
tenants to fit out
shell of building
4 3 12 Identify at an early stage and with
Business Growth Team, how this can
be supported.   
I3FL-R19 Financial  Lack of budget to
support
maintenance of
buildings until
tenants take
occupancy, if
buildings are
classified and non -
operational.
2 2 4 Identify at an early stage with
Finance and Estates, how this can be
supported.   
I3FL-R20 Professional  Lack of project
management
experience.
2 3 6 Ensure experience project
management team, both in-house
and any external support. 
Budget allows for appointment of
required expertise.  
I3FL-R21 Professional  Poor change
management
procedures.
3 3 6 Clear and agreed procedures set in
place for internal change
management and for external
processes with design team and
contractor.  
I3FL-R22 Professional  Specification –
design issues on-
site
2 4 8 Adopt best practice design and
ensure flexibility for subsequent
division/ alteration of premises.  
I3FL-R23 Contractual /
Political 
Failure to deliver
community
benefits – training,
employment
3 4 12 Incorporate appropriate community
benefits into contract terms and
resource appropriately
I3FL-R24 Contractual  Issues with co-
ordination on-site -
contracts, visitors
2 4 8 Ensure main contractor has
appropriate procedures for site
management
I3FL-R25
(IP)
QUALITY 
Reputational /
Political 
The Flexible Space
Programme’s Full
Business Cases fail.
3 2 6 Development of OBC/FBC in
accordance with Green Book
Flex Space OBC approved June 21
Flex Space Ph1 FBC approved Dec 22
Review capex and opex costs 
Partner/stakeholder risk assessment 
Early market input / partner &
commercial input
Review governance arrangements. 
386

Page 387

NAC Growth and Investment 
AGD Business Case 
45
Ref  Category Risk Description Impact Likeli-
hood
RAG Mitigating Actions
I3FL-R26
(IP)
QUALITY
Reputational 
Demand for the
Flex Space
Programme
diminishes and
there is no interest
from occupiers.
3 2 6 Flexible design to maximise potential
interest from occupiers. 
Marketing and promotion of
floorspace
Continue to establish relationships
with national sectors (incl NMIS) 
Interest in Phase 1 has confirmed
market interest and reduced risk
Review of Ph2&3 prepared by
property agents. 
I3FL-R27 Reputational  Market
expectations are
not met.
2 5 10 Scale/ quality/ design based on
identified market needs
Recent research has established
demand. 
Continue to review demand and
business needs with Partners
including SE and SDI.
Involve relevant business
engagement
partners.
I3FL-R28 Reputational  Businesses
interested in units
decide not to
progress
3 5 15 Ensure ongoing engagement with
businesses to prepare suitable Heads
of Terms. 
I3FL-R29
(IP)
EXTERNAL Project delays due
to external
economic impacts
such as COVID-19
and recovery.
4 2 8 Early analysis has identified that the
need for this project is unlikely to be
diminished and in fact may be even
greater. 
Analysis of external factors will be
monitored that area likely to impact
on the project. 
I3FL -R30
(IP)
SPEND Proposals become
unaffordable and
there are cost
overruns. 
4 3 12 Regular review of design vs budget,
value engineering and impact of
market conditions on costs
Benchmark costs
Ensure early infrastructure cost
tested /informed SI
Provide for contingency and Green
Book compliant optimism bias
allowances 
Ensure project approval processes
are in place to control budget
compliance
Pursue additional funding sources.  
I3FL-R33
(IP)
SCHEDULE 
Timescales /
Financial 
Existing and
proposed utilities
cause issues or
delays e.g. surface
water drainage
connections, sub-
station
requirements. 
3 3 9 Ensure exact locations of existing
infrastructure identified
Early engagement with SPEN,
Scottish Water, BT etc. 
Testing to be carried out and
capacity to be confirmed for water
supply
387

Page 388

NAC Growth and Investment 
AGD Business Case 
46 
2.10  Constraints 
There are no significant internal constraints to the delivery of the project. North Ayrshire
Council will bring together an experienced delivery team supported by internal or external
design, project management and contract skills as required. The completed units will be
owned and managed by NAC in line with existing estates management and will be marketed
via a number of appropriate sources. 
2.11 Dependencies 
Phase 2 of the project is subject to the following dependencies that will be carefully monitored
and managed throughout this phase of the project: 
• A successful tender process that produces a valid tender outcome within the project’s
cost envelope.
• FBC endorsement by Government 
• FBC Approval by Ayrshire Economic Joint Committee 
• Award of contract by NAC following Joint Committee approval
• Demand from businesses for the space and commitment to a lease 
• Input from local schools and colleges for work placements and training outcomes 
• Availability of skilled workforce to take up job opportunities 
In addition, the success of the main project is dependent on a number of factors including: 
• Input from local schools and college (s) for work placements and training outcomes;
and
• Longer term - seeking the support from a public transport provider for a new bus route
to ensure the location and the job opportunities can be accessible to and affordable for
local people, including people with disabilities. 
388

Page 389

NAC Growth and Investment 
AGD Business Case 
47
3. THE ECONOMIC CASE   
3.1 Introduction 
In accordance with the Capital Investment Manual and requirements of HM Treasury’s Green
Book (A Guide to Investment Appraisal in the Public Sector), this section of the FBC
documents the procurement process and provides evidence to show that we have selected
the most economically advantageous offer, which best meets our service needs and optimises
value for money.  It should be noted that this process relates specifically to Phase 2 of the
Programme, which is for one 18,191ft2 (1,690m2) GIFA industrial unit. The level of information
provided regarding the procurement process has been informed by discussions with NAC’s
Corporate Procurement Unit and is in accordance with the Council’s Standing Order. The
Council’s Corporate Procurement Unit has advised that once the tender process is complete,
details of the bidders, their final costs and the evaluation scores, must be kept confidential
prior to the award of the tender, as this would be a breach of the Council’s Standing Orders.
Details of the contract award will be published on Public Contracts Scotland and North
Ayrshire Council’s contract register when the successful bidder is awarded. 
3.2 Critical success factors 
The AGD has a regional economic vision for Ayrshire that focuses on unlocking local potential
for the wider benefit of the Scottish and UK economies. 
The AGD programme links to Governments’ objectives for increased growth and prosperity.
The programme is based on the achievement of inclusive economic growth with a clear focus
on addressing the issues of relatively poor levels of innovation and productivity, and inequality
across the regional economy. 
Under the Regional Vision, assessed projects are grouped together into five programmes
which have been developed from the Prospectuses ‘Framework for Growth’ and ‘Connecting
Communities to Growth’ with the infrastructure proposals developed from ‘Connections for
Growth’ prospectus. These programmes focus on high growth, high value sectors that
Ayrshire has real opportunities in and are linked to Ayrshire’s general manufacturing strength,
distinctive coastal opportunities and to its communities. 
The AGD aim is to marry business growth opportunities to employment progression, to
developing the future workforce and to community development whereby all communities
benefit from economic growth. 
The AGD programmes reflect the strengths and opportunities of the Ayrshire economy. 
The critical success factors (CSFs) shown within the OBC for the Flexible Space Programme
were as follows in the table below: 
389

Page 390

NAC Growth and Investment 
AGD Business Case 
48
Table 19: Critical Success Factors 
Critical Success Factors Measures to Address Critical Success Factors 
BUSINESS NEEDS:
How does the option satisfy the AGD Vision & key
themes? 
• Supporting economic growth for Ayrshire and
Scotland by attracting next generation
manufacturing businesses. 
STRATEGIC FIT:
How does the option provide a holistic fit and synergy
with other national, regional and local strategies?  
• Supporting growth of the life sciences sector 
• Delivering net additional economic outcomes 
BENEFITS OPTIMISATION:
How does the option optimise value for money? 
• Cost per job for public sector 
POTENTIAL ACHIEVABILITY: 
Is the option viable and can it be delivered? 
• Site capacity to accommodate floorspace 
MARKET CAPACITY:
Will the option meet an identified market demand,
remove a constraint and how will it affect existing
supply? 
• Level of market demand to take the completed
units / development plots 
POTENTIAL AFFORDABILITY:
Can the option be funded both the up-front capital
and future revenue? 
• Availability of AGD or other public / private
funding 
3.3 The long-listed options, Flexible Space Programme   
The longlisted, shortlisted, and preferred options set out in the OBC remain valid, and their
original rankings are unchanged. Since completion of the OBC, no material changes have
arisen that would affect the options appraisal process, the value-for-money assessment of
shortlisted options, or the selection of the preferred option. For clarity, the appraisal work
documented within the OBC has been re-stated in this FBC, while updated economic
modelling has been undertaken to assess the delivery models required to progress Phase
Two. The information presented on procurement reflects advice received from North Ayrshire
Council’s Procurement team and is fully aligned with Council policy. 
In line with Standing Orders, details relating to bidders, final costs, and evaluation scores must
remain confidential until the tender award is confirmed. Following award, details of the
successful contractor will be published on Public Contracts Scotland and the North Ayrshire
Council contract register. 
390

Page 391

NAC Growth and Investment 
AGD Business Case 
49
Table 6: Assessment of Options for i3 Flexible Space Programme at OBC Stage – Long List 
OPTIONS 
1. LOCATION 
1.1 i3 Enterprise Area (EA)  1.2 Other North Ayrshire Site  1.3 Other Ayrshire Sites
i3 is one of two locations in
Scotland marketed by SDI for
manufacturing linked to life
sciences & related sectors. It
has key locational benefits for
investors, with existing
established businesses. 
Preferred Option 
A limited number of other North
Ayrshire sites have capacity to
accommodate new development
but are unable to offer the
locational advantages of i3,
installed infrastructure capacity
and existing business base. 
Discounted Option 
Irvine has key sector and cluster
strengths in life sciences and is
therefore an attractive
proposition for investors in
comparison to other Ayrshire
sites.   
Discounted Option 
2.1 Site Preparation Only 2.2 Flexible Space on all Sites  2.3 Flexible Space 
3
INTERVENTION 
Create prepared site
platforms at i3, ready for
immediate development. This
would offer a low-cost option
but would fail to meet the
needs of life sciences and
related manu-facturing
businesses for premises.
Discounted Option
Flexible space across the whole i3
area, including the large Strategic
Investment Campus could mean
the space would be too
dispersed, reducing its impact
and chance to create a central
cluster of activity.   
Potential Future Option
Delivering flexible space on a
phased basis linked to the
DOMC proposal, and that
addresses market need for
business space with the
opportunity to review the
specification after Phase 1. 
Preferred Option
3. SCALE
3.1 Small-Scale / Cautious 3.2 Mid-Scale Market Ready   3.3 Large-Scale / Ambitious
Developing 1 or 2 shell
buildings to test market
interest but discounted due to
value for money factors i.e.
there is clear demand for the
units proposed but developing
in smaller phases will
ultimately increase costs.
Discounted Option
Similar to Option 2.3, a
market-ready proposition that
balances forecast demand,
level of risk, cost efficiencies
and future flexibility. 
Preferred Option
Similar to Option 2.2, cost
savings could be made if
large-scale flexible space was
delivered. This could
significantly increase costs
and risks, overstep the known
level of demand and is likely
to be in advance of need.
Discounted Option
4. FUNDING SOURCES 
4.1 Seek AGD Funding  4.2 Seek Other Public Funds  4.3 Seek Private Partner
AGD funding through the
public sector allows business
space to be provided in the
face of market failure as
development is not viable for
the private sector. Consider-
ation to be given to a rolling
development programme
utilising development income. 
Preferred Option 
There are no alternative public
sector funding sources
identified to deliver this scale of
intervention. We will continue
to scan the market to identify
other funding sources and
respond accordingly.
Potential Future Option 
Attracting private investment
to develop new business space
was considered but has been
discounted due to its lack of
viability in Ayrshire. This
option will be reviewed as a
future option. 
Discounted Option 
5. TIMESCALES
5.1 Immediate 5.2 Phased Approach  5.3 Postpone
Similar to 2.2 and 3.3, there is
potential to develop the whole
of the i3 site immediately. This
would deliver cost savings to
the public sector but would also
increase risk and remove the
option to adapt the size/ layout
of proposed space on demand. 
Discounted Option 
Delivering the AGD investment
through a phased approach
minimises risk – this creates
flexible manufacturing space,
alongside the DPMC project, to
meet immediate demand and
allows further phases of flexible
space, based on take-up of Phase
1.
Preferred Option 
The project could be planned,
designed, costed, approved and
all relevant permissions secured
but construction postponed til
occupier interest is secured.
This option fails to meet the
current market need for good
quality business units that are
ready for occupation 
Discounted Option 
391

Page 392

NAC Growth and Investment 
AGD Business Case 
50
Preferred way forward – Flexible Space Programme at OBC 
The preferred way forward at SOC and OBC stages was AGD funding (4.1) to deliver flexible
space (2.3) at i3 Enterprise Area (1.1) through a mid-scale intervention (3.2) within a phased
timescale (5.2), as follows: 
Table 20: Preferred Way Forward, Flexible Space Programme – OBC Stage
4.1  Seek AGD Funding  2.3  Flexible Space  1.1  i3 Enterprise
Area 
3.2  Mid-Scale
Market Ready 
5.2  Phased
Approach 
AGD funding through
the public sector
allows business
premises to be
provided in the face
of market failure as
development is not
viable for the private
sector. 
Consideration will be
given to a rolling
development
programme utilising
development income. 
Delivering flexible
space on a phased
basis that
complements the
DPMC proposal,
and that addresses
market need for
business space with
the opportunity to
review the
specification after
Phase 1. 
i3 is one of two
locations in
Scotland
marketed by SDI
for manufacturing
linked to life
sciences &
related sectors. It
has key locational
benefits for
investors, with
existing
established
businesses. 
Similar to
Option 2.3, a
market-ready
proposition
that balances
forecast
demand,
level of risk,
cost
efficiencies
and future
flexibility. 
Delivering the AGD
investment
through a phased
approach
minimises risk –
this creates flexible
manufacturing
space and the
Digital Hub to
meet immediate
demand and
allows further
phases of flexible
space, based on
take-up of Phase 1. 
3.4 Short-listed options, Flexible Space Programme 
The short-listed options shown within the OBC were as follows and are summarised in the
tables below for the overall i3 Flexible Space Programme. 
• Option 1 – do nothing 
• Option 2 – the preferred option – flexible space, phased
• Option 3 – ambitious option – flexible space, accelerated 
Table 7: Assessment of Options for i3 Flexible Space Programme at OBC Stage  - Short List  
Option 1
Do Nothing 
Option 2 (Preferred)
Flexible Space, Phased  
Option 3 (Ambitious)
Flexible Space, Accelerated
Delivers no additional
floorspace
Attracts 0 occupiers
Delivers 0 gross jobs
Delivers 8,830 sqm floorspace (NIA)
Attracts 8 to 16 occupiers 
Delivers 162 net jobs 
Delivers 8,830 sqm floorspace (NIA)
Attracts 8 to 16 occupiers
Delivers 162 net jobs
Investment Level 
AGD NAC & SG £0
Other Funding £0
Investment Level 
AGD NAC £4M
AGD SG £11M
Investment Level 
AGD NAC £4M 
AGD SG £11M
Delivery Timescale 
N/A
Delivery Timescale 
(21/22) to (27/28)
Delivery Timescale 
(21/22) to (24/25) 
In addition, the following table provided a review of each of the short-listed options,
considering how each performed against the Critical Success Factors for the i3 project.   
392

Page 393

NAC Growth and Investment 
AGD Business Case 
51
Table 21: Review of Critical Success Factors for Shortlisted Options for Overall Flexible Space
Programme at OBC Stage 
1. Do Nothing  2. Preferred 3. Accelerated 
BUSINESS NEEDS:
How does the option
satisfy the AGD Vision &
key themes? 
• Delivers no additional
floorspace
• Delivers 8,830 sq
metres (NIA) of
advanced
manufacturing
floorspace that will
support economic
growth
• Delivers 8,830 sq
metres of advanced
manufacturing
floorspace in one
phase.  
STRATEGIC FIT:
How does the option
provide a holistic fit and
synergy with other
national, regional and
local strategies?  
• Attracts no business
occupiers 
• Delivers no jobs
• Attracts approx. 8 to
16 occupiers 
• Delivers 162 net jobs
(Direct & Indirect)
• Strong synergy with
national Advanced
Manufacturing and
Chemical and Life
Science Strategies.
• Attracts 8 to 16
occupiers 
• Delivers 162 net jobs
(Direct & Indirect)
• Strong synergy with
national Advanced
Manufacturing and
Chemical and Life
Science Strategies.
BENEFITS
OPTIMISATION:
How does the option
optimise value for
money? 
• There is no value for
money as the project
is not delivered. 
• The option delivers
floorspace on a phased
basis allowing time for
review and ensuring
the accommodation
meets market
requirements.
• The option delivers
all floorspace within
one phase but at risk
and with possible
financial liabilities.
POTENTIAL
ACHIEVABILITY: 
Is the option viable and
can it be delivered? 
• N/A • This development
option can be
accommodated at i3.
• This development
option can be
accommodated at
i3. 
MARKET CAPACITY:
Will the option meet an
identified market
demand, remove a
constraint and how will
it affect existing supply? 
• Market demand not
met. 
• This development
option has been
profiled against
detailed market
knowledge.
• This development
option is likely to be
in advance of
market need.
POTENTIAL
AFFORDABILITY:
Can the option be
funded both the up-front
capital and future
revenue? 
• N/A • £15m AGD funding is
required. Future
revenue costs will be
met from revenue
returns (rent and plot
sales).
• £15m AGD funding
is required. Future
revenue costs will be
met from revenue
returns (rent and
plot sales). 
It should be noted that the total floorspace stated at OBC was updated at the Phase 1 FBC,
with assumptions that due to cost increases the scale of floorspace was now likely to be
reduced and that the estimated floorspace may be in the region of 6,000m2. (para 1.1.3,
Phase 1 FBC). 
Key Findings from OBC Analysis 
The table below shows the estimated high level economic outcomes at OBC stage. 
393

Page 394

NAC Growth and Investment 
AGD Business Case 
52
Table 22: High-level Economic Outcomes at OBC Stage 
STAGE 1 - Scotland Impacts - Standard Analysis as calculated before (traditional)
Outcome
Short Listed Options 
Option 1
Do
nothing
Option 2
Preferred
Preferred
(sensitivity check -
negative impact)
Preferred
(sensitivity check
- positive impact)
Option 3
(accelerated)
Business space created (NIA) 0 8672 sq m 8672 sq m 8672 sq m 8672 sq m
Capital  Expenditure
n/a
£15,000,000 £15,000,000 £14,000,000 £15,000,000
Net Present Cost £12,764,649 £12,764,649 £11,978,658 £13,545,157
Optimism bias 5% 5% 5% 5%  
Direct Jobs 0 111 100 111 111
Indirect Jobs 0 51 26 51 51
Total Jobs 0 162 126 162 162  
Construction jobs 0 150 150 140 150
Construction GVA £000 £0 £5,008,507 £5,008,507 £4,700,105 £5,314,757  
Direct GVA (Present Value of
Benefits) 25 year NPV £0 £54,552,693 £50,233,326  £55,882,327 £56,223,953
Indirect GVA 25 year NPV £0 £25,428,207 £13,338,450 £26,045,489 £26,184,461
Total GVA 25 year NPV £0 £79,980,900 £63,571,776 £81,927,816 £82,408,414  
Present Value of Costs to
Government n/a
£12,764,649 £12,764,649 £11,978,658 £13,545,157
NPV £41,788,044 £37,468,676 £43,903,669 £42,678,796
BCR 4.27 3.94 4.67 4.15
Rank based on BCR   1 n/a n/a 2
STAGE 2- Scotland Impacts - Spatially Adjusted Analysis to align 'traditional' results with Inclusive Growth approach
within Scottish Government's Economic Strategy
Spatial Adjustment factor
n/a
1.11 1.11 1.11 1.11
NPV £60,376,266 £55,595,800 £61,847,840 £62,225,935
BCR 4.73 4.36 5.16 4.59
STAGE 3- UK Impacts - calculate extent of UK level impacts by taking Scotland level impacts and calculating proportion
of them which remain after applying UKG guidance
Spatial Adjustment factor (d) n/a 1.22 1.22 1.22 1.22
STAGE 4- UK Impacts - A high employment area can be thought of as drawing labour from UK whereas low employment
area will draw from the local area
Steady State Direct
Employment - Jobs 0 111 100 111 111
Steady State GVA £0 £9,377,900 £8,440,110 £9,377,900 £9,377,900
GVA per head for project £0 £84,486 £84,401 £84,486 £84,486
Productivity Adjustment factor
(r)
n/a
2.03 2.03 2.03 2.03
Overall UKG Adjustment Factor
(UKAF) (g) 2.48 2.48 2.48 2.48
Scottish BCR Factor (b) 1.23 1.25 1.21 1.24
Rank based on Overall UKG
Adjustment Factor   1 n/a n/a 2 
The key appraisal assumptions made in the OBC Economic Analysis were as follows:  
• Appraisal period – 25 years
• Discount rate – 3.5%
• Spatially adjusted analysis, using Green Book techniques, to account for the local
income distribution, compared with the country as a whole
• Employment multipliers – taken from the Scottish Government’s Supply, Use and Input
-Output Tables: 1998-2021 
394

Page 395

NAC Growth and Investment 
AGD Business Case 
53
The original short list options appraisal from the OBC resulted in the following overall findings
with the preferred option as flexible space, delivered on a phased basis.   
Table 23: OBC Investment Appraisal Ranking 
Evaluation Results  Option 1
Do Nothing 
Option 2
Preferred (Phased) 
Option 3
Ambitious (Accelerated) 
Economic Appraisal  3 1 2
Benefits Appraisal  3 1 2
Risk Appraisal  3 1 2
Overall Ranking  3 1 2 
Preferred Option – Phase 1 
The preferred and agreed option at OBC stage was a phased approach to flexible space as
shown in the table above. In considering moving forward to deliver the first phase, it was
agreed that the Council would progress an initial unit at i3 that was originally part of the first
Phase, with assistance from internal resources and making use of the Council’s AGD £4M
allocation if required. In scoping out options for delivery of Phase 1, the following options were
considered in the table below with the preferred option in bold. 
Table 24: Flexible Space, Phase 1 - Options 
Flexible Space, Phase 1 – Options 
Business as usual Do Nothing (Counterfactual) 
Preferred Option Deliver 18,180 sq ft (1,690 m2) unit with occupancy
achieved half-way through 24/25
Deliver Phase 2 instead Deliver two sets of terraced units and one modular unit
(2,504 sq m)
Preferred Option Sensitivity Check
– Negative Impact
Unit subdivided into 4 with 100% occupancy achieved in
2027/28
Sensitivity Check – Positive Impact Assumes unit fully occupied at the start of 24/25 
Flexible Space Phase 2 Options Appraisal 
Following approval from the UK and Scottish Governments of the Outline Business Case
(OBC), approved in June 2021, the i3 Flexible Space Programme is being delivered in three
phases, The first phase Full Business Case (FBC) was approved in November 2022 and
constructed in 2025-26. 
This Phase 2 FBC seeks approval for an estimated investment of £6.775M in a single 18,191
sq ft (1,690 sq m) industrial unit with related yard space and parking, and wider suds and
roads infrastructure, funded by the Local Regeneration Fund (formerly Levelling Up Fund 3)
(£4.7M) and Ayrshire Growth Deal (£2.075M). To assess the economic impact of this phase,
updated modelling has been undertaken to compare the delivery of this phase against a ‘do
nothing’ baseline scenario. 
The Glasgow City Region (GCR) Intelligence Hub’s Business Case Economic Model (BCEM)
has been utilised to assess the value for money of the Flex Space Phase 2 project. BCEM
follows the methodology outlined within the GCR’s Programme Management Toolkit –
quantifying Benefit-Cost Ratios (BCRs) using a HM Treasury Green Book approved
methodology. The modelling has assessed five options and these are shown in the table
below. 
395

Page 396

NAC Growth and Investment 
AGD Business Case 
54
Table 25: Flexible Space Phase 2 Options 
Option  Title  Description 
1 Do Nothing. 
2 Single Unit Deliver one 1,690 sqm (18,191 sqft) GIFA unit by 30 June 2027, with
occupancy starting 01 April 2028. – total value £7.65M
3 Subdivided Unit Deliver 1,630 sqm (17,544 sq ft) GIFA of space subdivided into 4
lettable units by 30 June 2027 with 100% occupancy by 01 April
2029.projects as funded by external match-funding – total value
£7.67M
4 Terraced Units Deliver Flex Space Phase 3 earlier by 31 March 2028, which includes
two sets of terraced units totalling 1,068 sqm (11,496 sq ft) with
100% occupancy by 1 April 2029. – total value £7.02M
5 Smaller unit, LUF 3 Deliver a smaller single unit within the LUF 3 budget cost envelope
(estimated at 1,281 m2) by 30 April 2027 with full occupancy by 01
January 2028.   Total value £5.38M 
Table 26 and Table 27 below show the impacts of each option, Table 27 with the construction
impacts removed. Note cost figures inputted into the model are expressed as Present Value
terms, where a 3.5% discount Rate is used as set by the Green Book.
Table 26: Benefits-Cost Ratio Timeframe - 25 Year Appraisal 
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit Sub divided Unit Terraced Unit Small Unit + LUF
PV of Capital Costs All Geographies £0 £6,806,267 £6,817,997 £6,204,841 £4,754,090
PV of Revenue Costs All Geographies £0 £847,851 £859,795 £823,880 £632,261
PV of Total Costs All Geographies £0 £7,654,118 £7,677,791 £7,028,721 £5,386,350
Local Authority £0 39 41 39 28
Ayrshire Growth Deal £0 49 53 49 36
Scotland £0 79 84 79 58
Local Authority - £2,102,108 £2,250,353 £2,064,459 £1,561,971
Ayrshire Growth Deal - £2,669,343 £2,857,591 £2,621,535 £1,983,455
Scotland - £4,279,291 £4,581,076 £4,202,648 £3,179,726
Local Authority £0 19 19 12 15
Ayrshire Growth Deal £0 26 25 16 20
Scotland £0 34 33 22 26
Local Authority - £50,628,932 £48,878,624 £29,253,376 £40,832,926
Ayrshire Growth Deal - £67,318,248 £64,990,968 £38,896,456 £54,293,087
Scotland - £88,822,688 £85,751,972 £51,321,713 £71,636,712
Actual 0 £39,735 £38,001 £8,963 £30,329
Net Impact - £39,735 £38,001 £8,963 £30,329
Local Authority - £6.91 £6.69 £4.49 £7.90
Ayrshire Growth Deal - £9.18 £8.88 £5.96 £10.49
Scotland - £12.22 £11.84 £7.97 £13.96
Person Years of Construction
Employment
Present Value of Net Additional
Construction GVA
Benefit Cost Ratio
Full-time Equivalent Jobs
Present Value of Net Additional
Operational GVA
PV of GHG Carbon Accounting
396

Page 397

NAC Growth and Investment 
AGD Business Case 
55
Table 27: Benefits-Cost Ratio Timeframe - 25 Year Appraisal (Construction Impacts Removed) 
Key Findings 
The key findings for the options that have been modelled for Phase 2 are as follows: 
Option 1: Do nothing/minimum status quo
Do Nothing 
Option 2: Single Unit: 
• Creates 49 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 79 person years of employment in the Construction sector (Scotland) 
• Supports 26 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £67.318m in net additional GVA over 25 years, £2.669m when construction
impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a of £9.18:£1 Benefit-Cost Ratio (Ayrshire Growth Deal Region) 
Option 3: Sub Divided Unit: 
• Creates 53 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 84 person years of employment in the Construction sector (Scotland) 
• Supports 25 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £64.990m in net additional GVA over 25 years, £2.857m when construction
impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a of £8.88:£1 Benefit-Cost Ratio (Ayrshire Growth Deal Region) 
Option 4: Terraced Unit:
• Creates 39 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 49 person years of employment in the Construction sector (Scotland) 
• Supports 16 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £38.896m in net additional GVA over 25 years, £2.621m when construction
impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a positive rate of return through a £5.96:£1 Benefit-Cost Ratio (Ayrshire
Growth Deal Region) 
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit Sub divided Unit Terraced Unit Small Unit + LUF
PV of Total Costs All Geographies £0 £7,654,118 £7,677,791 £7,028,721 £5,386,350
Local Authority £0 £52,889,911 £51,374,336 £31,575,564 £42,551,916
Ayrshire Growth Deal £0 £70,246,516 £68,211,833 £41,856,541 £56,515,423
Scotland £0 £93,547,670 £90,916,429 £56,013,778 £75,208,127
Local Authority - £50,787,804 £49,123,984 £29,511,105 £40,989,946
Ayrshire Growth Deal - £67,577,173 £65,354,242 £39,235,006 £54,531,968
Scotland - £89,268,380 £86,335,353 £51,811,130 £72,028,400
Actual 0 £39,735 £38,001 £8,963 £30,329
Net Impact - £39,735 £38,001 £8,963 £30,329
Local Authority - £6.64 £6.40 £4.20 £7.61
Ayrshire Growth Deal - £8.83 £8.51 £5.58 £10.12
Scotland - £11.66 £11.24 £7.37 £13.37
Present Value of Net Direct GVA
Present Value of Net Additional
GVA
PV of GHG Carbon Accounting
Benefit Cost Ratio
397

Page 398

NAC Growth and Investment 
AGD Business Case 
56
Option 5: Small Unit funded by Local Regeneration Fund (formerly LUF3)
• Creates 36 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 58 person years of employment in the Construction sector (Scotland) 
• Supports 20 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £54.293m in net additional GVA over 25 years, £1.983m when construction
impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a positive rate of return through a £10.49: £1 Benefit-Cost Ratio
(Ayrshire Growth Deal Region) 
Economic Modelling Conclusion 
In conclusion, Option 2, the delivery of a Single Unit approach provides overall the greatest
economic benefits. 
Benefit Cost Ratio Analysis
North Ayrshire Council acknowledges that the Benefit Cost Ratio (BCR) for Option 5 the
delivery of a small unit with Local Regeneration Funds provides the best return at £10.49:£1
invested. This reflects the combination of funding e.g. AGD and Local Regeneration Funds,
and the reduced footprint generated e.g. 1,281m2 at a reduced budget of £5.38M. However,
considering the broader gains Option 2 provides a good financial investment return for the
AGD, which includes the creation of a larger footprint of 1,690m2. 
In response, the sensitivity of this preferred option was tested to establish if additional benefits
could be generated when amending variables in the delivery and operation of the project.
Through negative adaptations (e.g. full occupation delayed until 01 October 2028) the BCR for
the Single Unit dropped marginally to £9.25:£1. However, when positive changes are made
(e.g. full occupation brought forward to 01 October 2027) the BCR increased to £9.92:£1, thus
generating an uplift to £71.627m in net additional GVA over 25 years. A projected increase of
£4.309m compared to the unadjusted projection for a Single Unit. 
3.5 The procurement process 
3.5.1 The Long List Criteria 
The Phase 2 Flex Space project is being procured through the Public Contracts Scotland
portal as an open tender for a one-off contract to construct an advanced factory unit within a
total project budget value of £6.775M (including fees, construction cost estimate and other
costs). The tender is expected to be published in May 2026 with returns expected in early July
2026. The bids will be assessed on pass / fail question, following which bids will be
progressed to the quality assessment stage and then to the commercial stage. As mentioned
in paragraph 3.1, the Council’s Corporate Procurement Unit has advised that details of the
bidders, their final costs and the evaluation scores, must be kept confidential prior to the
award of the tender, as this would be a breach of the Council’s Standing Orders. Details of the
contract award will be published on Public Contracts Scotland and North Ayrshire Council’s
contract register when the tender is awarded to the successful bidder. 
3.5.2 Long list
The number of bids received will be assessed on their response to pass/fail questions and as
a result of this assessment, bids will then be assessed in terms of the quality evaluation. 
398

Page 399

NAC Growth and Investment 
AGD Business Case 
57
3.5.3 Short list criteria
The quality evaluation stage will account for 20% of the score. Following the completion of the
quality evaluation, bidders will proceed to the commercial evaluation stage which accounts for
80% of the score. The commercial evaluation involves a review of the bids, including an
arithmetic check, rate analysis and a review of tender qualifications, with any clarifications
sought from bidders where necessary. 
3.5.4 Short list
Following the commercial evaluation bidders will be assessed and scored and ranked
according to the quality and cost assessments. A preferred bidder will be selected that is
within the available budget. 
3.6 Economic appraisal 
3.6.1 Introduction
This section provides an overview of the costs and benefits associated with the main
Advanced Manufacturing Flexible Space project generally, including the focus of this Phase 2
FBC, the delivery of construction contract for an advanced factory unit of 18,191 sq ft (1690 sq
m) and on a total site of 4.59 acres. 
3.6.2 Estimating benefits 
Methodology
The Outline Business Case (OBC) set out the benefits associated with each option for the
main Flexible Space project and the AGD PMO undertook economic modelling for the overall
project. The key findings from this analysis were presented in the OBC. As part of this Full
Business Case, economic modelling has been undertaken for Phase 2 only, the outcome of
which is contained in Appendix D. In addition, a Benefits Realisation Plan has been developed
to add to this work, which is detailed in the paragraphs below. 
Description, sources and assumptions
The benefits identified fell into the following main categories. In each case, the sources and
assumptions underlying their use is explained. 
• Quantitative – cash releasing benefits: financial benefits that the project will help
generate. These include direct benefits such as rental income and indirect benefits -
such as business rate receipts; 
• Quantitative – non-cash releasing benefits: societal benefits which can be
monetised and expressed in Gross Value Added (GVA) terms.
• Qualitative – non-cash releasing benefits: these are assessed separately in
paragraph 3.7.2 
Table 28: Main Benefits
Type Direct to Organisation(s) Indirect to Organisation(s)   To society 
Quantitative
(or quantifiable) 
• Rental income  • Business rates receipts 
• Provision of additional new
space for businesses
• Reduction in area of vacant
and derelict land 
Cash releasing  • Reduction in grounds
maintenance costs once
tenant moves in 
• Accelerated/enabled
construction activity
• Carbon efficiency savings for
tenant.
Non-cash
releasing   
• Productivity gains to existing
businesses 
Qualitative (or
non-quantifiable)  
• Improvement in appearance of
part of business park.
399

Page 400

NAC Growth and Investment 
AGD Business Case 
58 
The estimated benefits arising from Phase 2 of the project, in relation to this procurement
exercise, relate mostly to the potential for benefits through rental income, the provision of new
space for businesses, the appointment of contractors and enabled construction activity with
the potential to support training places, maintain jobs and support SMEs through the contract.   
The economic modelling for Phase 2 in Appendix D for the Preferred Option, would in summary
deliver the following: 
• Creates 49 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 79 person years of employment in the Construction sector (Scotland) 
• Supports 26 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £67.318m in net additional GVA over 25 years, £2.669m when construction
impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a of £9.18:£1 Benefit-Cost Ratio (Ayrshire Growth Deal Region) 
A Benefits Realisation Plan has been developed for the Ayrshire Growth Deal projects and
has identified the outcomes, outputs and impacts that could be measured for the overall
Flexible Space project. These are listed below, and it’s anticipated that Phase 2, similar to
Phase1, will provide those benefits at a smaller scale. 
Table 29: i3 Flexible Advanced Manufacturing Space - Outputs, Outcomes and Impacts, Benefits
Realisation Plan 
Ref Indicator 
Outputs 
AGD/O/1 Direct/Indirect jobs 
AGD/O/2 Construction jobs 
AGD/O/3 Safeguarded jobs 
AGD/O/4 Community Benefits 
AGD/O/5 Jobs retained 
AGD/O/6 Jobs secured 
AGD/O/7 New or upgraded roads/junctions/cycle pathways 
AGD/O/8 Journey time savings/modal shifts 
AGD/O/9 Development space unlocked 
AGD/O/10 Reduced vacant & derelict land 
AGD/O/11 Digital Infrastructure 
AGD/O/12 New Residential Energy Supply 
AGD/O/13 Visitors 
AGD/O/14 Start-Ups 
AGD/O/15 Private sector investment 
AGD/O/16 Leverage: (including LA, HE/FE, Private Sector and any other leverage 
AGD/O/17 Income Levels 
AGD/CB/O/1 Training places / Weeks 
AGD/CB/O/2 Training places / accredited qualification main-contractor 
AGD/CB/O/3 Training places / accredited qualification sub-contractor 
AGD/CB/O/4 Schools Outreach 
AGD/CB/O/5 CWB Support Places 
AGD/CB/O/6 Fair Work Accreditation 
AGD/CB/O/7 SME’s supported 
AGD/CB/O/8 Regional Supplier Spend 
AGD/CB/O/9 Work Experience 
AGD/CB/O/10 Total jobs created by NSAfC projects (Apprentices) 
400

Page 401

NAC Growth and Investment 
AGD Business Case 
59
AGD/CB/O/11 Total jobs created by NSAfC projects (Graduates) 
AGD/CB/O/12 Total jobs created by NSAfC projects (New Entrants) 
AGD/CB/O/13 Construction Careers Information, Advice & Guidance (CCIAG) Events  
AGD/CB/O/14 Number of learners receiving an Industry certification – main contractor 
AGD/CB/O/15 Number of learners receiving an Industry certification – sub-contractor 
AGD/CB/O/16 Number of Training Plans for sub-contractors  
AGD/CB/O/17 Site visits by Colleges  
AGD/CB/O/18 Supply Chain Briefings to sub-contractors 
AGD/CB/O/19 Business Skills Supports for sub-contractors  
AGD/CB/O/20 Support for the Third Sector 
AGD/CB/O/21 Softer community benefits delivered to Ayrshire as part of the project   
Outcomes 
AGD/OT/1 Job Levels (new and maintained)  
AGD/OT/2 Development Space uptake 
AGD/OT/3 Digital usage patterns 
AGD/OT/4 Reduced (net) Fuel Poverty 
AGD/OT/5 Increase in visitor spend 
AGD/OT/6 Start-up performance/survival 
AGD/OT/7 Additional investment (including FDI) 
AGD/OT/8 Improved business productivity 
AGD/CB/OT/1 CWB participant well-being uplifts 
AGD/CB/OT/2 Fair Work implementation 
Impacts 
AGD/I/1 Net additional jobs created/ maintained 
AGD/I/2 Net additional returns on investment 
AGD/I/3 Net changes in Fuel Poverty 
AGD/I/4 Net additional user productivity 
AGD/I/5 Follow on investment 
AGD/I/6 Reduced levels of deprivation within the region  
AGD/I/7 Increased income levels 
AGD/CB/I/1 Wider uptake of Well Being/Fair work 
AGD/CB/I/2 Net uplifts in regional supplier spend  
AGD/CB/1/3 Case Studies – qualitative community impacts  
In addition, the selected preferred bidder will be asked to commit to a number of Community
Benefits. 
3.6.3 Estimating costs
In terms of Phase 2 of the Flexible Space Programme, a pre-tender estimate was undertaken
by the project that was within the available budget of for the delivery of Phase 2. 
3.6.4 Cost appraisal conclusions 
For the project to proceed, the supplier selected as a result of the cost assessment of the
bidders, will require to have a tender value which is below the overall budget for the contract
tender which is within the overall project budget of £6.775M (excluding consultancy and other
fees).   
3.7 Qualitative benefits appraisal 
The qualitative benefits associated with the Flexible Space Programme generally, were set out
within the Outline Business Case. 
3.7.1 Methodology
The appraisal of the qualitative benefits was undertaken via the following process for the OBC:
• Identifying the benefits criteria relating to each of the investment objectives
401

Page 402

NAC Growth and Investment 
AGD Business Case 
60
• Weighting the relative importance (in percentage terms) of each benefit criterion in
relation to each investment objective
• Scoring each of the short-listed options against the benefit criteria on a scale of 0-9
• Deriving a weighted benefit score for each option 
3.7.2 Qualitative benefits criteria
The benefits criteria were weighted as follows for each investment objective, as part of the
OBC. Specific qualitative benefits were added for Phase 1 of the Flexible Space but
maintaining the original percentages and the same has been done for Phase 2 which will also
contribute to achieving these benefits. 
Table 30: Qualitative Benefits Criteria
Objectives Qualitative Benefits, Flex Space Programme  Flex Space  Weight   
1 2 %
1. To create flexible
business space capable
of meeting
manufacturing
requirements for
chemical and life
sciences, but also for a
wide range of other high
value sectors.
• New business units will be occupied by Ayrshire/ Scottish/
UK/ overseas businesses   20
• Created/safeguarded jobs will generate economic value –
jobs, GVA, turnover for Ayrshire and Scotland  
• Supply chain outcomes will be created for other Ayrshire
and Scottish businesses  
• Design and construction contracts will generate turnover
for Ayrshire and Scottish contractors  
• Construction jobs and training outcomes will be created,
primarily for Ayrshire people and particularly drawn from
disadvantaged or Protected Characteristic groups.
 
2. Create a centre of
digital innovation which
offers digital tools,
support and innovation
scaled to a national
market supporting a
restructure of the
regional economy to
deliver advanced
manufacturing. 
• University and College presence at i3 offering training and
business development opportunities.  
20
• Cluster of R&D and spin off opportunities  
• Providing employment, skills development, community
wealth building and supply chain growth opportunities
 
• Providing the private sector with opportunities for
upskilling, business transformation and increased
productivity
 
3. To create serviced
industrial land and
capable of immediate
development.
• Development plot will be available for indigenous Ayrshire/
Scottish, UK-owned and foreign investors
  10
• Design and construction contracts will generate turnover
and jobs for Ayrshire and Scotland
 
4. To create opportunities
for employment and
inclusive growth with
particular emphasis on
making connections to
local communities,
schools and colleges in
preparation for
employment, particularly
in areas of deprivation.
• New employment outcomes – direct and indirect through
supply chains  
20
• Work experience and training places for school and
college student.
 
• Job market entrants and low skilled workers increasing
soft and basic skills through provision of local jobs. 
 
• Residents of deprived areas gaining access to
opportunities 
• University presence enabling additional educational and
training opportunities 
 
• Delivery of enhanced public transport connection that
opens up employment opportunities  
5. To attract mobile and
private sector
investment both from
abroad and from
indigenous companies.
• New employment and training outcomes   15
• Demonstrate attractiveness of Scotland as excellent location
for life sciences manufacturing
 
• Increased investment confidence  
402

Page 403

NAC Growth and Investment 
AGD Business Case 
61
6. To create a sustainable,
high quality business
location and R&D
cluster, capable of
meeting and keeping
pace with the changing
demands of high value
manufacturing sectors
and complementing
national initiatives
including NMIS 
• Enhancement and maintenance of attractiveness of
Ayrshire as a location, meeting modern business needs
and promoting Industry 4.0 services. 
  15
• Large, visible and modern development that clearly
shows Ayrshire is Open for Business 

• Recognised as part of a national strategy for improving
digital technology   
3.7.3 Qualitative benefits scoring
The tender assessment for the refurbishment contract will include a quality assessment of the
bids based on a 20% quality / 80% cost ratio. NAC is anticipating receiving competent
submissions in relation to this aspect and to be able to score bidders against a set of agreed
criterion. 
3.7.4 Analysis of key results
NAC’s Corporate Procurement Unit will provide a completed tender score sheet for the
bidders, providing scores related to the quality and cost aspects, identifying a preferred bidder. 
3.7.5 Carbon Emissions Impact Cost 
Initial carbon analysis has been done for the overall project and is shown in Appendix I. The
project has been categorised as Control (3, then zero) and Influence (B). Further information
is contained in section 3.12 and 3.13. 
3.8 Risk appraisal – unquantifiables 
The tender for Phase 2 poses a number of risks which are contained in the main risk register
for the project. In summary, the main risks related to this project are considered to be: 
• Failure to obtain approval for the project’s Full Business Case.
• All sources of capital and revenue funding for the project are insufficient to deliver and
operate the project. 
• Delays to the project timescales caused by issues such as protected species, statutory
consents, procurement or construction. 
• Delays to the tender award period due to the requirement for various FBC approvals
which takes the timescale beyond the acceptance period, after which the preferred
supplier may increase their costs
• The project fails to attract enough of its target audience to generate sufficient income. 
Key project mitigations included the progress of Phase 1 of the project which is now
completed and has a tenant, therefore confirming demand for new space. For Phase 2, the
market has been tested at tender stage and additional sources of funding (Local Regeneration
Fund) have been sought to address the increases in costs since the estimates were prepared
for the OBC. 
Any additional risks will be highlighted following the tender process, regarding the selection of
a preferred bidder. 
3.9 The preferred option – selected supplier   
The procurement process to select a supplier to undertake the construction of a second
industrial unit, surrounding yard and infrastructure for the wider site at Riverside Way in i3,
Irvine, will commence in April 2026. It is hoped that a preferred supplier will be selected to be
403

Page 404

NAC Growth and Investment 
AGD Business Case 
62
appointed, who will have submitted a competent bid and will be appointed following the FBC
approval process. 
3.10 Sensitivity analysis 
General Sensitivity analysis has been undertaken as part of the economic modelling for Phase
2 and is set out in Appendix D. This included the full occupation delayed or brought forward.
However generally, the Preferred Option for Phase 2 provided a positive result. 
3.11 The preferred option   
The preferred option for the overall Flexible Space Programme was to deliver the project on a
phased basis. For this FBC, the preferred option is to select a recommended supplier in
accordance with the future tender assessment for the construction of a second industrial unit
at i3. It is anticipated that this option will offer value for money and will be within the available
budget for the project. 
3.12 Sustainability and carbon 
Like the Phase 1 unit, Phase 2 has been designed to be a robust and sustainable building that
is capable of being easily adapted if required, through for example the creation of a platform to
facilitate space for expansion, the ability to subdivide the building into a maximum of four units
or to install a mezzanine level. This approach seeks to reduce potential additional whole life
carbon emissions that could be created through any future adaptations required to the
building. The new occupier of Phase 1 is already proposing to construct an extension and
install a mezzanine level.   
3.13 Economic / Financial 
The Whole Life Carbon Emissions impact associated with the project, including embodied
carbon from construction, has been estimated in tonnes CO2e over the economic appraisal
period of 25 years. This is shown in the tables below in terms of embodied carbon and
operational carbon. 
3.13.1 Embodied Carbon 
No embodied carbon targets were set for the building at the design stage and therefore, the
measurement of embodied carbon has been estimated based on a similar calculation to the
units being constructed at AEP and within the AEP approved OBC of <970kgCO2/m2
referenced from the RIBA 2030 Climate Challenge target. Prior to the construction stage the
contractor will require to investigate and make allowances for the usage of recycled materials
where possible. 
Table 31: Estimated Embodied Carbon, Flexible Space Phase 2
Embodied Carbon 
Unit  Area Embodied
Carbon Target 
kgCO2/m2
Estimated
Embodied
Energy (whole
Life) 
Embodied
Energy per year
(/60) ***
Phase 2 Flex
Space 
1,690 m2 969.0 1,638,579 27,310 
404

Page 405

NAC Growth and Investment 
AGD Business Case 
63 
Figure 12: RIBA 2030 Climate Change Target Metrics 
3.13.2 Operational Carbon 
Operational energy use is not currently known, given the speculative nature of the
development. In this respect, energy demand has been estimated. 
Table 32: Estimated Operational Carbon, Flexible Space Phase 2
Operational Carbon 
No.  Building Use  Calculated Annual
Demand (kWh) 
Area (m2) Demand / m2
Phase 2,
Flexible
Space 
Light
Industrial  204,842* 1,690 m2 121.0
*Sourced from modelling input spreadsheet for preferred option 
Table 33: Estimated Whole Life Carbon, Flexible Space Phase 2 
Whole Life Carbon 
Building  Area Estimated
Energy Use
/ m2 (based
on mean
precedented
use)
Estimated
Annual
Energy
Use
UK Grid Carbon
Factor from
Carbon Trust
‘Conversion
Factors’ 2023
Update
kgCO2e /
year
Whole Life
(60 years)*
Phase 2,
Flexible
Space
1,690  121  204,490 0.20707* 42,344 2,540,640
*Sourced from AEP table 
405

Page 406

NAC Growth and Investment 
AGD Business Case 
64
4. THE COMMERCIAL CASE 
4.1 Introduction   
The overall Advanced Manufacturing Flexible Space Programme is seeking delivery of
floorspace and related works, over a series of phases. This was identified as the preferred
option in the approved Outline Business Case. This FBC is for the second phase of the
programme which is for one 18,191 sqft (1,690m2) GIFA industrial unit. This section of the
FBC sets out the negotiated arrangements for the provision of an industrial unit and related
yard space and infrastructure, under a contract with the selected bidder. The drawings below
show the proposed layout and elevations of the unit which have received planning permission
(25/0299/PP). 
Figure13: Phase2 Unit drawings 
406

Page 407

NAC Growth and Investment 
AGD Business Case 
65 
4.2 Required services 
The products and services under contract are as follows: 
• the design and construction of a new 18,191 ft2 (1,690m2) industrial unit suitable for
class 4,5 & 6 outlined within, The Town and Country Planning (Use Classes)
(Scotland) Order 1997, to be presented to the market with core fitted out to a Category
A level. The remaining space will be subject to subsequent fit out by future tenants. 
The proposed Flex Space Phase 2 unit includes the following specifications and will be
situated immediately adjacent to the recently completed Flex Space Phase1 unit and the
established Digital Process Manufacturing Centre (DPMC) which has been operational since
February 2025. The unit will incorporate sustainable and low carbon components and offers
an impressive specification including secure yardage; dedicated parking including EV
charging; Low energy LED lighting; office heating via air source heat pump; roof mounted PV
panels and FTTP fibre connection. Modifications or complete bespoke solutions have been
considered for the unit, to be easily subdivided into a maximum of 4 no. separately lettable
units and expansion of the unit is possible by a minimum of 50% to the north of the industrial
unit. The quantity of office and ancillary accommodation will generally be around 10% of the
total floor area. Further details are set out within the table below: 
Table 1: Phase 2 Flex Space Specification 
ITEM  PROVISION 
GENERAL  • Unit specification suitable for immediate occupation
• GIFA 18,191 ft2 (1690m2)
• Site Area 74,023ft2 (6877m2)
• Steel portal frame
• Profiled and microrib cladding panels to Building Standards Class 1
Storage/Factory Use
• Cat A office fit out
• Fully serviced with water and electricity (metered)
• BT Openreach FTTP fibre connection
407

Page 408

NAC Growth and Investment 
AGD Business Case 
66
• Storage areas for waste collection and provision of infrastructure to
facilitate future installation of sprinkler system tank provided 
POWER • 100kVA 3-phase supply to each unit
• additional ducts to each sub-divided unit will be installed to allow future
Tenants to apply for individual LV connections based upon their anticipated
design load requirements.
• all apparatus and wiring connected to the low voltage systems shall be
suitable for use with a 3 Phase, 4 Wire, 400 Volt or 230 Volt, Single Phase,
50 Hertz earthed neutral system.
WAREHOUSE/
FACTORY
• 8m haunch height (9.28m to ridge)
• Concrete floors with 50kN/m2 floor loading
• 10% roof lights
• Powered 4.4m (H) x 4.76m (W) level loading doors
• High bay LED lighting (330 lux)
OFFICE & 
CONVENIENCE
• Suspended ceilings with recessed LED lighting
• Kitchen
• Unisex and accessible WCs
EXTERNAL • Secure 31.5m deep concrete service yard with gates will be formed to the
rear of the property accessed from a road constructed to adoptable
standards and suitable for RCC (Roads Construction Consent)
• Dedicated car parking to NRDG Standards
• Covered Bicycle storage to NRDG Standards
SUSTAINABILITY  • EPC rating "B"
• EV charging points
• Water saving sanitaryware
• Low energy PIR controlled LED lighting
• Air source heat pump for office heating and cooling
• Roof mounted solar PV installed with scope to increase this as required.
SECURITY  • gated access,
• intruder alarm 
• internal & external security lighting
• 2.4m high open mesh steel panel Security Fencing to the boundary 
VEHICLE
PARKING
• 35 spaces for General Industrial (Class 5) use in accordance with minimum
NRDG Standards
DISABLED
PARKING 
• 4 spaces 
EV PARKING
PROVISION 
• 4 active spaces / 8 passive spaces 
CYCLE PARKING
PROVISION 
• 12 spaces or 6 cycle stands 
The Council’s Property Management and Investment (PMI) Team have led on developing the
design of the unit. This has involved mainly architecture and quantity surveying services and
they also procured the following external services: 
• Geotechnical 
• Cost consultants 
• M&E
• Site investigation work
• Land based engineering works
• Ecologists 
• Transport specialists 
408

Page 409

NAC Growth and Investment 
AGD Business Case 
67
4.3 Potential for risk transfer 
Risks that could affect the successful implementation of the project have been identified and
are set out in detail in the Risk Register attached as Appendix E. This includes details of risk
owners, risk evaluation and mitigation measures. In terms of this FBC, the general principle of
‘risk passed to the party best able to manage them’ subject to value for money, has been
applied. For this project it is anticipated that the associated risks may be apportioned between
the Council, design team, contractor and occupier. This is shown in the table below, where we
have agreed that we will apportion service risks in the design build and operational phases as
follows: 
Table 34: FBC Flex Space Phase 2, Risk Transfer Analysis 
Risk Category  Potential Allocation  Comments 
Public  Private Shared 
1. Design Risk     Depends on contract type and
conditions. 
2. Construction &
Development Risk     Depends on contract type and
conditions.
3. Transition &
Implementation Risk     Both parties will establish and agree
change management procedures if
not dictated by contract type. 
4. Availability &
Performance Risk     Performance of design team and
contractor will be monitored by NAC. 
5. Operating Risk     NAC will manage the completed units. 
6. Variability of Revenue
Risks     Rental income profiled at market rate
but NAC will retain risk of variance. 
7. Termination Risks     NAC will hold risk if contractor or
tenant terminates their agreements. 
8. Technology &
Obsolescence Risks     NAC and occupier carry risks relating
to obsolescence of property and
equipment. 
9. Control Risks     NAC holds overall control for the
delivery and ongoing management of
the project. 
10. Residual Value Risks     The completed floorspace will hold a
residual value for which NAC is
responsible for maintaining the value. 
11. Financing Risks     Limited – major costs relate to up-front
capital construction and potentially
empty rates obligation. Tenants will be
responsible for property maintenance.
Issues related to Local Regeneration
Fund (LUF3) grant criteria.   
12. Legislative Risks     N/A. Likely only to apply to initial
planning and building warrant – risks
will be off-set by securing permissions
in advance of construction. 
13. Other Project Risks     Cost inflation. Supply of materials. 
4.4 Agreed charging mechanism 
The payment mechanism agreed with the service provider with respect to the construction of
the industrial unit will involve submission of invoices by the contractor at agreed stages of the
works, which will be certified by the consultant’s team to NAC for payment. In addition, this
409

Page 410

NAC Growth and Investment 
AGD Business Case 
68
phase will generate ongoing rental income from the lease of the completed unit with rent
charged at appropriate rates in line with market conditions. A valuation prepared in December
2024 for the project suggested a market rent of £7.00 per sq ft. Based on a total development
Gross Internal Area (GIA) of 18,200 sq ft, this would be a total rent of £127,400 per annum.
The valuation is based on the unit, extending to a total of 18,191 sq ft (1,690 sq m) consisting
of an industrial processing packaging/ laboratory/ warehouse area of approximately 16,361 sq
ft (1,520 sq m) and provision for office, reception and meeting areas of approximately 1,830 sq
ft (170 sq m), suitable for Class 4, 5 & 6 uses is to be situated on 16,355 sq m of vacant land. 
It's anticipated that NAC will not consider selling buildings initially, to ensure NAC benefits
from income generated. NAC will also be responsible for any Non-Domestic Rates charges
accruing against any vacant units following handover from the contractor.   
For the Local Regeneration Fund (Levelling Up 3 funding) its anticipated that the Council would
pay the invoices and claim the funds from the UK Government. 
4.5 Agreed contract length 
Building contracts are envisaged to endure for a period of construction only. Occupier
contracts are envisaged to be leases to occupiers on terms that are appropriate to secure the
investment i.e. at the maximum term that the occupier will accept. This is expected to enhance
financial and economic returns to the public sector and provide a return on capital investment. 
4.6 Key contractual clauses 
The Form of Contract for the project is the SBCC Design and Build Contract for use in
Scotland (DB/Scot), 2016 edition incorporating Amendment 1 February 2018. The key
contractual clauses are as follows: 
• Clause 4.18.1 Retention Percentage – 3%
• Clause 6.4.1 Contractors Insurance – injury to persons or property - £10,000,000
• Clause 6.5.1 Insurance – Liability of Employer - £10,000,000
• Clause 6.7 Insurance of the works – Option A applies (By Contractor)
• Clause 6.15 Contractors Designed Portion Professional Indemnity Insurance - £10M 
In addition, the preferred supplier has stated that they will deliver a number of community
benefits. 
It would be inappropriate to incorporate contract clauses for occupiers of the completed units.
However, there is an opportunity to work with tenants to maximise impacts and benefits for
local people and local businesses through supply chains and local procurement mechanisms. 
4.7 Personnel implications (including TUPE) 
It is anticipated that the TUPE – Transfer of Undertakings (Protection of Employment)
Regulations 1981, will not apply to any aspect of this project. 
4.8 Procurement route and implementation timescales 
The procurement of this Phase was through a tender advertised on Public Contracts Scotland. 
The implementation milestones for the scheme are to be discussed with the selected service
provider. The dates shown below are critical in terms of how quickly the FBC can be endorsed
and approved, in order to award the contract before the tender acceptance period expires, to
410

Page 411

NAC Growth and Investment 
AGD Business Case 
69
enable the works to commence. Indicative Project Milestones are shown at 6.3.3, including
information regarding Levelling Up Fund 3 (LUF2) which is partly funding this project. 
Table 35: Key timescales for progress of Phase 2 Unit 
Stage  Estimated Date 
Full Business Case submitted to AGD PMO 10 April 2026
Tender published  06 May 2026
Tender returns 01 July 2026
Tender evaluation ends 31 July 2026
Final feedback / endorsement from Govt on FBC  21 Aug 2026
Cabinet endorse FBC  01 Sept 2026
AEPB & AEJC approval (special meeting to be set) 11 Sept 2026
Contract award 16 Sept 2026
Contract completion  22 Sept 2027
Deadline for drawing down Local Regeneration Funds  31 March 2028 
4.9 FRS 5 accountancy treatment 
It is envisaged that the assets underpinning the delivery of the service will be on the balance
sheet of the organisation should the development remain in the ownership of NAC. 
411

Page 412

NAC Growth and Investment 
AGD Business Case 
70
5.0 THE FINANCIAL CASE 
5.1 Introduction 
The purpose of this section is to set out firm financial implications of this contracted solution.
At FBC stage for Phase 1, it was noted that there had been changes to the financial
implications, following on from the approval of the Outline Business Case in June 2021.
Adjustments were made to the estimated overall level of floorspace that the Programme was
anticipated to achieve, from 9,000 square metres (97,000 sq ft) to just over 6,000 square
metres (65,000 sq ft). The difference in floorspace estimated was due to a combination of the
OBC costs being early indicative estimates, prepared prior to the development of QS cost
reports for the project, and significant construction cost increases. 
The overall cost of Phase 1, now delivered, is £5.147M, which delivered 1,690m2 of flexible
floorspace. This included support of £0.967M from the Scottish Government’s Vacant and
Derelict Land Fund for the Phase 1 plot and early development work for the overall Flexible
Space Programme. The unit is now let (from mid-March 2026) and will begin to generate
rental income for the Council from June 2026.   
The estimated cost of Phase 2 is £6.775M, including consultants fees, construction estimate
and other costs. This includes not only a unit of a similar size to Phase 1 and related yard
space but also a level of fit out to enable tenants to occupy the unit immediately and suds and
roads infrastructure for Phase 2 and the wider site, to enable future phases. The overall area
for the Phase 2 unit and yard space is 7,322m2. The wider area of the site included in Phase
2 is 18,568m2 (4.59 acres) which is 39% of the area of the Phase 2 site. The projected spend
profile for Phase 2 is shown below, including estimated revenue costs for the Council, prior to
the unit being occupied.   
It’s anticipated that revenue costs will include the following costs listed below until the unit is
occupied. However, these costs will eventually be offset by the additional rental income to the
Council. 
• Maintenance, repair and management
• Rates & utility bills
• Marketing and promotion
• Legal fees
• Building insurance
• Statutory compliance certificates and any associated works
• EPC costs 
Table 36: Flexible Space Phase 2, Project Spend Profile 
Construction
Spend 
Total
Spend
Year 4 Year 5
24/25
Year 6
25/26
Year 7
26/27
Year 8
27/28
Capital spend  £6.775M £0.051m £0.305M £0.132M £2.068M £4.220M
Revenue
spend 
£0.0675M  £0 £0 £0 £0.0675M
Total  £6.8425M £0.051M £0.305M £0.132M £2.068M £4.2875M 
To mitigate the risk of increased costs and the volatility of the construction market, Phase 2 is
being supported with £4.706M of funding leveraged from the Local Regeneration Fund (see
5.3 below). 
412

Page 413

NAC Growth and Investment 
AGD Business Case 
71 
5.2 Impact on the organisation’s income and expenditure account 
The anticipated payment stream for the project over its intended life span is set out in the
following table which shows the overall Flexible Space Programme.   
The payment stream in relation to Phase 2 is also shown in the Table below. It is anticipated
that the tender for the works will come back within the budget available, enabling the works to
progress. 
It should be noted that increased project costs have been mitigated for Phase 2 through the
UK Government’s Local Regeneration Fund, to support this particular phase. 
Table 11a: Flexible Space Financial Profile – Capital Expenditure 
£'000 Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30
Phase 1 5,147 34 140 217 403 2,912 1,387 53 0 0 0 0
Phase 2 6,775 0 0 0 0 51 305 132 2,068 4,220 0 0
Phase 3 8,751 0 0 0 0 0 0 0 230 3,655 4,866 0
Total 20,673 34 140 217 403 2,963 1,692 185 2,298 7,875 4,866 0 
Table 11b: Flexible Space Financial Profile – Capital Funding 
£’000 Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
19/20 20/21 21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30
Scottish
Government 11,000       307 2,195 1,38 0 0 2,372 2,372 2,372
NAC 4,000 34 83 122 0 51 308 53 230 2,996 2,494 (2,372)
AGD Total  15,000 34 83 122 307 2,246 1,692 53 230 5,368 4,866 0
VDLF 967   56 95 97 718         
LRF 
(Prev LUF3) 4,706             132 2,068 2,507    
Project Total  20,673 34 140 217 403 2,963 1,692 185 2,298 7,875 4,866 0 
5.3 Local Regeneration Fund (formerly Levelling Up Fund, 3)   
Phase 2 of the project benefits from an award of £4.706M as part of the UK Government’s
Local Regeneration Fund (formerly LUF 3). The approved Phase 1 FBC had advised of an
application for Levelling Up Funding being considered by the UK Government which, if
successful, could have contributed to Phase 1, however this fund was postponed. As a result,
Phase 2 is now benefitting from the fund, providing crucial leverage for the flexible space
programme, helping to address budget challenges and replacing the majority (69%) of the
AGD funding for Phase 2.  This is part of an overall £17.5M allocation to North Ayrshire,
aiming to address market failure, through the delivery of new energy efficient commercial
property alongside the provision of low carbon infrastructure at key employment sites including
i3. 
5.4 Impact on the balance sheet 
An updated version of this FBC will advise on the outcome of the tender process and whether
the tender costs of the preferred bidder are affordable to deliver Phase 2 and are within the
capital expenditure available within the budget. 
413

Page 414

NAC Growth and Investment 
AGD Business Case 
72
5.5 Overall affordability 
The capital cost of the overall project is £15M from the AGD. Early spend has been supported
by the Vacant and Derelict Land Fund, prior to any draw down of AGD spend. It should be
noted that the capital costs for Phase 2 have not factored in any additional cost for private
sector tenants to fit out a completed unit for their specific purposes but a level of fit out is
being provided to enable immediate occupancy. 
It is anticipated that a tender can be received for Phase 2 which is competent, affordable and
within the available budget. 
NAC will be responsible for ongoing maintenance, marketing and management of the
buildings and any surrounding curtilage, until they are let, and will cover any related costs.
This will be offset by income generated from the completed project from the following: 
• Ongoing rental income through the lease of completed units; and 
• One-off capital receipts from the sale of buildings and/or development plots. 
The approved OBC had estimated overall rental income for the Programme to be in the
region of £400,000 by 2032. However, this is figure is likely to be significantly higher, based
on the known rental income due to be received for the Phase 1 unit from June 2026 onwards,
which will be higher than the rental valuation provided by Colliers of £127,500. In addition, a
valuation for the Phase 2 unit by Ryden in December 2024 estimates rental income of
£127,400 per annum for Phase 2. 
ASSURANCE STATEMENT
This is to confirm that the financial profile for the project outlined in Section 5.2 above reflects the
position of North Ayrshire Council as at the date stated below.
Name of Council’s S95 Officer in block capitals:  MARK BOYD 
Signed: 
Date:  xx May 2026 
414

Page 415

NAC Growth and Investment 
AGD Business Case 
73
6.0 THE MANAGEMENT CASE 
6.1 Introduction 
This section of the FBC addresses how the scheme will be delivered successfully. 
6.2 Programme management arrangements 
The three Ayrshire Councils (East, North and South) have agreed to implement a new
governance structure to oversee the delivery of the Ayrshire Growth Deal and to promote the
main drivers for the Regional Economic Partnership, namely: 
• to promote and deliver regional economic and inclusive growth on an Ayrshire-wide basis,
in line with the Scottish Government’s aim of having a Regional Economic Partnership for
every region of Scotland;
• to provide the robust shared governance which will enable the Scottish and UK
Governments and other funding sources to dispense monies on an Ayrshire basis; 
• To encourage the meaningful involvement of private sector partners as well as the public
sector;
• The structure should be as simple as possible, but be capable of adaptation as required;
and
• To recognise that the funding element is being delivered through Councils, and
consequently democratic accountability will be required for key investment decision. 
The governance for the AGD programme includes the following: 
• The Ayrshire Economic Joint Committee (AEJC) – comprising Elected Members,
representatives from Scottish Enterprise, Skills Development Scotland, business and
education.
• The Ayrshire Regional Economic Partnership Board (AEPB) – comprising Elected
Members, representatives from public sector partners including SE, SDS, HIE,
VisitScotland, HE, FE, the third sector and the business community. 
These committees have oversight of the AGD both at a programme level and in terms of
approval of detailed business cases for individual projects, as well as continued monitoring
and evaluation of the AGD programme post Deal document sign off. Please see Figure 14
below, showing the standard AGD Governance approach. 
The projects also have internal Gateway Review Boards to monitor and review progress and
reach agreement on key aspects of the project. 
It is anticipated that over time the 3 Councils will develop more regional responses to the
needs of our businesses and communities to complement the AGD investment. This is
currently being developed through an agreed proposal between NAC and EAC for an
Economic Development service that includes AGD delivery teams from both Councils.   
The i3 Flexible Space programme including Phase 2, is an integral part of the Ayrshire Growth
Deal Programme of Economic Infrastructure. The Programme will be managed by North
Ayrshire Council in conjunction with the AGD PMO and related Governance structure. 
415

Page 416

NAC Growth and Investment 
AGD Business Case 
74
Figure 14: Standard AGD Governance approach 
6.3 Project management arrangements 
Phase 2 of the Flex Space Programme, which is the subject of this FBC, will be managed by
the Council’s PMI team and will follow the PRINCE2 methodology as much as possible. 
6.3.1 Project reporting structure 
NAC has established internal governance arrangements for the management of its AGD
project(s) organised through a Project Board. The NAC Project Board has overall authority
and responsibility for project delivery including the Business Case, prior to submission to the
NAC Executive Leadership Group for approval and prior to submission to the Programme
Management Office (PMO). 
The Board has a project management responsibility but no decision-making powers. The
Project Board provides a mechanism for accountable project management delivered by
regular progress reporting and updates and coordination of all design teams and initiatives
associated with infrastructure, employability, business and innovation strands. 
The Project Board will co-ordinate the overall delivery of the Phase 2 Flexible Space project.
Project Management responsibilities for Phase 2 sit with the Council’s Property Management
and Investment (PMI) Team who have led on the development of the design on behalf of the
Growth and Investment Team who have acted as client. PMI will continue this role as part of
the delivery stage. Overall responsibility will rest with Director of Growth and Investment
reporting to the Chief Executive. All personnel will be experienced and professionally qualified
in their respective roles. The project will be managed in accordance with NAC project
management procedures. The Senior Responsible Officer for the project in NAC is the Senior
Manager, Growth and Investment, with support from a Growth and Investment Manager as
project lead. A full multi-disciplinary team will advance the project to completion. Regular
monthly updates will also be provided to the PMO and to Governments in accordance with the
required reporting for all Ayrshire Growth Deal projects as defined by the AGD Governance
document. 
416

Page 417

NAC Growth and Investment 
AGD Business Case 
75
As a large percentage of the project is funded by the Local Regeneration Fund, the project is
also subject to providing quarterly progress and programme updates to Government through
an online portal reporting system.   
Figure 15: Organisational chart, showing governance of the project 
6.3.2 Project Roles and Responsibilities 
Phase 2 of the Flex Space Programme is being managed by the Council’s PMI team. For the
purposes of the Ayrshire Growth Deal processes, the SRO is Louise Kirk, Head of Service,
Economic Development, Growth and Regeneration, North Ayrshire Council and Project Lead
is Marnie Ritchie, Regeneration Manager, North Ayrshire Council. The overall Project Team
includes the Council’s Growth and Investment, PMI and Finance teams. The appointed
contractor’s role will be for the completion of the design and build of the Phase 2 unit. The
table below sets out roles and responsibilities for Phase 2 of the project which is the focus of
this FBC: 
Table 37: Roles & Responsibilities 
Senior Responsible Officer  Louise Kirk, Head of Service, Economic Development,
Growth and Regeneration, NAC 
Chief Financial Officer Mark Boyd, Head of Finance, NAC 
Project Manager Alan Martin, Team Leader, PMI, NAC 
Senior Manager Bruce McClure, Snr Manager, Growth & Investment, NAC 
Project Lead (client)  Marnie Ritchie, Manager, Growth & Investment 
Specialist advisors  See para 6.4
Project Contractor Preferred supplier 
6.3.3 Project Plan 
The Project Plan is set out in the table below with a status update for each milestone.
Additional milestones have been added for Phase 2, in particular to reflect the current
approval processes for the FBC and Gateway milestones. A project plan will also be required
from bidders for the construction tender to demonstrate how they can meet the required
timelines. A Delivery Assurance Implementation Plan (DAIP) was produced by the AGD PMO
in early 2026. The milestones vary slightly from the detail in the DAIP that has been shared
with Governments, following the finalisation of the tender and FBC and this is illustrated below
the first table. 
417

Page 418

NAC Growth and Investment 
AGD Business Case 
76
Table 9: Flexible Space Phase 2, Project Milestones (working version) and comparisons to DAIP
FLEXIBLE SPACE, PHASE 2: Key Milestones  Estimated
date 
Quarter  
(financial
year)
Status
Flexible Space Outline Business Case  Approved 
Phase 1, Full Business Case granted  Approved 
Planning approval granted for Phase 2 Complete 
NAC Gate 3, Project Board, Investment Decision to tender 23 Jan 26 Q4, 25/26 Complete
NAC publish Invitation to Tender (ITT) (estimate) 06 May 26 Q1, 26/27 Not started
NAC receive tenders (estimate) 01 Jul 26 Q2, 26/27 Not started
NAC tender evaluation period ends  14 Aug 26 Q2, 26/27 Not started
Government endorse Phase 2 FBC 21 Aug 26 Q2, 26/27 Not started
NAC report FBC to Cabinet 01 Sept 26 Q2, 26/27 Not started
AEPB & AEJC approve Phase 2 FBC   11 Sept 26 Q2, 26/27 Not started
NAC award Phase 2 contract, D&B contract commences  16 Sept 26 Q2, 26/27 Not started
NAC commences marketing of the building  Sept 26 Q2, 26/27 Not started
Contractor completes construction works 22 Sept 27 Q2, 27/28 Not started
Contractor handover to NAC  22 Oct 27 Q3, 27/28 Not started
NAC sets closing date for interest and selection of tenant tbc tbc Not started
Current deadline for claiming all Local Regeneration Fund 31 Mar 28 Q4, 27/28 In progress
NAC reports Outputs/Outcomes/CWB  tbc tbc Not started
NAC delivers subsequent Phases and related FBCs.   tbc tbc Not started 
FLEXIBLE SPACE PHASE 2, 
ESTIMATED TIMELINES 
Y7 (2026/27) Y8 (2027/28) Y9 (2028/29)
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Current Delivery Assurance Imp Plan
dates
FBC           
FBC approval by June 26, Q1 
Contract award/delivery phase from Jul 26, Q2, to contract completion in Jul 27, Q2.
Updated FBC milestone dates  FBC           
FBC approval during Sept 26 in Q2
Contract award/delivery phase from Sept 26, Q2, to contract completion in Sept 27, Q2. 
6.4 Use of Special Advisers 
Special advisers are being used for Phase 2 of the project as follows: 
Table 38: Special Advisers 
Specialist Area Adviser  Detail 
Financial  N/A 
Technical Clancy  Structural Engineers & Civils consultants 
Hulley & Kirkwood Mechanical & Electrical Engineering
Consultants
NAC Property
Management &
Investment (PMI) Team
Architect, Quantity Surveyor, Project
Management Services
Applied Ecology  Ecologists, ongoing input
Colliers  Land & proposed building valuation 
Stantec  Local Transport Strategy 
Procurement &
Legal 
N/A 
Business Assurance  Ryden  Property consultants
Other N/A 
418

Page 419

NAC Growth and Investment 
AGD Business Case 
77 
6.5 Arrangements for change management 
The change control process will be managed by NAC. Arrangements for change management
are set out within the Ayrshire Growth Deal Governance Document (v16) and are summarised
in the flow chart in Appendix J. 
6.6 Arrangements for benefits realisation   
A Benefits Realisation Logic Chain is shown in Appendix C. In addition, a Benefits Realisation
Plan for the Ayrshire Growth has been prepared and has identified the outcomes, outputs and
impacts that could be measured for this project as set out below. This will also ensure
alignment of information across the AGD documentation of the Implementation Plan and
Benefits Realisation Plan.   
Table: i3 Flexible Advanced Manufacturing Space - Outputs, Outcomes and Impacts, Benefits
Realisation Plan 
Ref Indicator 
Outputs 
AGD/O/1 Direct/Indirect jobs 
AGD/O/2 Construction jobs 
AGD/O/3 Safeguarded jobs 
AGD/O/4 Community Benefits 
AGD/O/5 Jobs retained 
AGD/O/6 Jobs secured 
AGD/O/7 New or upgraded roads/junctions/cycle pathways 
AGD/O/8 Journey time savings/modal shifts 
AGD/O/9 Development space unlocked 
AGD/O/10 Reduced vacant & derelict land 
AGD/O/11 Digital Infrastructure 
AGD/O/12 New Residential Energy Supply 
AGD/O/13 Visitors 
AGD/O/14 Start-Ups 
AGD/O/15 Private sector investment 
AGD/O/16 Leverage: (including LA, HE/FE, Private Sector and any other leverage 
AGD/O/17 Income Levels 
AGD/CB/O/1 Training places / Weeks 
AGD/CB/O/2 Training places / accredited qualification main-contractor 
AGD/CB/O/3 Training places / accredited qualification sub-contractor 
AGD/CB/O/4 Schools Outreach 
AGD/CB/O/5 CWB Support Places 
AGD/CB/O/6 Fair Work Accreditation 
AGD/CB/O/7 SME’s supported 
AGD/CB/O/8 Regional Supplier Spend 
AGD/CB/O/9 Work Experience 
AGD/CB/O/10 Total jobs created by NSAfC projects (Apprentices) 
AGD/CB/O/11 Total jobs created by NSAfC projects (Graduates) 
AGD/CB/O/12 Total jobs created by NSAfC projects (New Entrants) 
AGD/CB/O/13 Construction Careers Information, Advice & Guidance (CCIAG) Events  
AGD/CB/O/14 Number of learners receiving an Industry certification – main contractor 
AGD/CB/O/15 Number of learners receiving an Industry certification – sub-contractor 
AGD/CB/O/16 Number of Training Plans for sub-contractors  
AGD/CB/O/17 Site visits by Colleges  
AGD/CB/O/18 Supply Chain Briefings to sub-contractors 
419

Page 420

NAC Growth and Investment 
AGD Business Case 
78
AGD/CB/O/19 Business Skills Supports for sub-contractors  
AGD/CB/O/20 Support for the Third Sector 
AGD/CB/O/21 Softer community benefits delivered to Ayrshire as part of the project   
Outcomes 
AGD/OT/1 Job Levels (new and maintained)  
AGD/OT/2 Development Space uptake 
AGD/OT/3 Digital usage patterns 
AGD/OT/4 Reduced (net) Fuel Poverty 
AGD/OT/5 Increase in visitor spend 
AGD/OT/6 Start-up performance/survival 
AGD/OT/7 Additional investment (including FDI) 
AGD/OT/8 Improved business productivity 
AGD/CB/OT/1 CWB participant well-being uplifts 
AGD/CB/OT/2 Fair Work implementation 
Impacts 
AGD/I/1 Net additional jobs created/ maintained 
AGD/I/2 Net additional returns on investment 
AGD/I/3 Net changes in Fuel Poverty 
AGD/I/4 Net additional user productivity 
AGD/I/5 Follow on investment 
AGD/I/6 Reduced levels of deprivation within the region  
AGD/I/7 Increased income levels 
AGD/CB/I/1 Wider uptake of Well Being/Fair work 
AGD/CB/I/2 Net uplifts in regional supplier spend  
AGD/CB/1/3 Case Studies – qualitative community impacts  
6.7 Carbon management 
For all AGD projects, procedures will be developed across that apply best practice carbon
management techniques, notably PAS 2080: Carbon Management in Infrastructure, to ensure
that potential carbon emissions resulting from the project will be minimised from the outset.
For planned buildings, the RICS Whole Life Carbon Assessment for the Built Environment
approach will also be applied. These compatible approaches represent the highest standard in
whole life buildings and infrastructure carbon management and will ensure that the potential
carbon emissions impact of the project is demonstrably minimised. 
Embodied carbon (i.e., carbon particularly associated with construction materials and
processes) will be minimised utilising the above carbon management approaches, including
the use of innovative materials, construction techniques  and supply chain procurement
mechanisms to reduce carbon emissions, minimise waste and contribute towards a circular
economy, Design and construction of the project will target net zero operational emissions,
including no use of fossil fuels, at lease in accordance with the Scottish Government’s climate
change plan. 
Initial carbon analysis has been done for the overall project and is shown in Appendix I. The
project has been categorised as Control (3, then zero) and Influence (B). 
6.8 Arrangements for risk management 
The strategy, framework and plan for dealing with the management of risk will be through the
contract with monitoring by the Project Manager within the Council’s PMI Team. 
420

Page 421

NAC Growth and Investment 
AGD Business Case 
79
A copy of the project Risk Register is attached at Appendix E. This sets out who is responsible
for the management of risks and the required counter measures. 
6.9 Arrangements for contract management 
The Phase 2 Flex Space project will be managed by the Council’s PMI team and construction
phase will be delivered by the preferred bidder. Management will include regular progress
meetings and reports by the contractor. The Council’s PMI team will project manage and
oversee the works on behalf of North Ayrshire Council and will be responsible for resolving
any issues that arise with the contractor. 
6.10 Arrangements for post project evaluation 
Project monitoring and evaluation will be managed through AGD governance arrangements,
as established and through the reporting requirements related to the Local Regeneration
Fund. The project will be subject to regular review meetings to discuss progress, programme,
financial and technical matters. 
It will be necessary to monitor the impact of the AGD, including at individual project level. The
flexible space project will be monitored through the various Green Book Business Case
Stages by North Ayrshire Council’s Growth and Investment Team. The Project Lead will report
progress at key stages through a series of Gateway Boards and bi-monthly updates to the
Council’s Executive Leadership Team. Project spend will be monitored on a monthly basis
with the Council’s Finance Team. A monitoring and evaluation framework will be developed to
monitor the project’s outputs and outcomes and ensure that those are included, where
possible, within the procurement process. 
6.11 OCG Gateway review arrangements 
The Office of Government Commerce (OGC) Gateway Process is designed to provide
independent guidance to Senior Responsible Owners (SROs), programme and project teams
and to the departments who commission their work, on how best to ensure that their
programmes and projects are successful. This process examines programmes and projects at
key decision points in their lifecycle. It looks ahead to provide assurance that they can
progress successfully to the next stage. These key stages or ‘Gates’ are: 
• Gate 0 – Strategic Assessment 
• Gate 1 – Business Justification 
• Gate 2 – Delivery Strategy 
• Gate 3 – Investment decision 
• Gate 4 – Ready for Service 
• Gate 5 – Benefits Realisation and Operational Review 
In terms of Phase 2 and this specific FBC, the internal project board will discuss the aspects of
the outcome of the tender process at a meeting in due course, and will require to be satisfied
with the outcome of the process outlined to them at the meeting in order for the proposed
contract award to progress through the next governance stages. 
421

Page 422

NAC Growth and Investment 
AGD Business Case 
80
6.12 Contingency plans 
In the event that this project fails, governance arrangements are in place to allow the Council
to agree an appropriate way forward with the PMO and Governments to ensure that there is
limited impact on the Ayrshire Growth Deal and the main funder for the Phase which is UK
Government, through the Local Regeneration Fund (formerly LUF3 fund). 
Signed:      XX 
Date:     Date / April / 2026 
Senior Responsible Owner 
Louise Kirk, Head of Economic Development, Growth & Regeneration, NAC 
422

Page 423

NAC Growth and Investment 
AGD Business Case 
81
PART C: APPENDICES 
Appendices 
Table 1: List of appendices
Ref. Appendices Referenced
A Heat Map and Inclusive Growth Drivers  1.2.1, 2.4.1  
B Flexible Space Links to AGD Projects  1.2.1
C Benefits Realisation Logic Chain 2.8, 6.6
D Economic Modelling & Technical Detail  1.3.1, 3.6.2, 3.10 
E Risk Register  1.4.2, 1.5.2, 2.9, 4.3, 6.8
F  Inclusive Growth & Community Wealth Building  1.1.1, 2.3.1
G  Community Benefit Statement  For information 
H  Equality Impact Assessment For information 
I Carbon Management  3.7.5, 6.7 
J Ayrshire Growth Deal Change Management Process 6.5   
423

Page 424

NAC Growth and Investment 
AGD Business Case 
82
APPENDIX A: INCLUSIVE GROWTH HEAT MAP 
424

Page 425

NAC Growth and Investment 
AGD Business Case 
83
APPENDIX B: AGD PROJECT LINKS 
Project Link  What is the Link?  Key Actions to Maximise Link  Expected benefits of the link
Digital
Process
Manufacturing
Centre
(DPMC), i3
The DPMC pilot at i3 is operational and
provides a unique facility for processing
manufacturing sector companies to improve
their productivity and modernise their
processes through digital automation. This is
linked to the i3 Flexible space to create a
cluster and accommodate business
opportunities arising from the DPMC project eg
business incubation units. 
• Dialogue required across AGD projects
to established differentiation between
projects, complementarity opportunities
and wider understanding of partner
roles in each project (eg NMIS,
University of Strathclyde, CPI, Ayrshire
College)
• Creation of cluster area at i3 with DPMC and
business space that complements each other
and accommodates spin off opportunities from
the DPMC facility being located at Irvine. 
• Opportunities for referral from DPMC to more
specialised F&D facility at AMIC 
Project Link What is the Link? Key Actions to Maximise Link Expected benefits of the link
Building
Digital Capital
(BDC)
This project replaces the Digital Infrastructure
(£3M) and Subsea Cable (£11M) projects
supporting digital infrastructure across Ayrshire
with an allocation of £4.6M for North Ayrshire
to support digital infrastructure, critical to the
region’s future growth. This will still seek to
improve connectivity for local businesses
including fibre, mobile, 5G and smart poles
infrastructure, building on the recent benefits
of the 5GIR private network pilot delivered at
DPMC. 
• Develop specific digital infrastructure
improvement proposals for i3 with BDC
project lead, Flex Space design team
and NMIS. 
• Information sharing and opportunities for joint
working. 
• Ensuring i3 connectivity requirements,
including that of DPMC partner NMIS, have
high visibility as part of the Digital
Infrastructure project. 
Project Link What is the Link? Key Actions to Maximise Link Expected benefits of the link
Ayrshire
Engineering
Park (AEP)
With potential links to NMIS (National
Manufacturing Institute Scotland) which are
still being explored, the Engineering Park will
provide businesses the opportunity to explore
how to improve process and improve 
engineering/manufacturing excellence to be 
the best in their field. i3 will provide a 
unique facility and hub for businesses 
seeking to improve their productivity and 
modernise their processes through digital 
automation for the chemical and Life 
Sciences sectors which is very much aligned 
• Set up referral routes from the project
• Working group oversees both projects
and responsible for integration.
• Sharing of information and joint
discussions with NMIS to ensure a
collaborative approach and avoid
duplication. 
• Sharing of learnings and studies which
would benefit or transfer across sub
sectors to benefit the wider
manufacturing sector in Ayrshire.
•  Sharing of information and resource. 
• Collaboration on projects which can be
developed with mass benefit to the wider
manufacturing sector in Ayrshire.
• Provision of flexible space in both North and
East Ayrshire which will drive inward
investment to the area providing greater
choice to investors and collaborative working
across the councils.  
425

Page 426

NAC Growth and Investment 
AGD Business Case 
84
with the Engineering Park vision. I3 and the 
Engineering Park will complement the
manufacturing industry in general across 
Ayrshire and the south-west of Scotland 
while focusing on different areas of industry. 
The development of advanced 
manufacturing space in both North and East 
Ayrshire will attract inward investment to 
the Ayrshire Region.
Project Link  What is the Link?  Key Actions to Maximise the Link Expected Benefits of the Link 
Ayrshire
Skills
Investment
Fund 
Ayrshire Skills Investment Fund has established
a responsive skills fund to drive Inclusive
Growth. The fund can help support people on
the programme to develop skills. The Ayrshire
Skills Investment Fund will add flexibility and
responsiveness to the skills system to address
related i3/DPMC industry needs. It can also
ensure that disadvantaged sectors of the
community have access to career opportunities
through the i3/DPMC AGD projects 
• Ensure attendance of Officer
representing Flex Space/DPMC at
relevant working group meetings
• Set up referral routes from project. 
• Joint discussions with local Colleges to
ensure a collaborative approach
• Sharing of information regarding skills
gaps identified through business
engagement
• Direct link to skills training
• Support to prepare those out of labour market
to new jobs
• Achievement of key outcome to raise skills
levels within the local area 
Project Link  What is the Link?  Key Actions to Maximise the Link  Expected Benefits of the Link 
AMIC
(Ayrshire
Manufacturing
Investment
Corridor) 
With links to NMIS the AMIC centre will provide
pilot plant facilities to allow F&D manufactures
to test and development new production and
manufacturing practices. While the DPMC at i3
provides a unique facility for process
manufacturing sector companies to improve
their productivity and modernise their
processes through digital automation. AMIC
and DPMC will complement the manufacturing
industry in general across Ayrshire and the
south-west of Scotland while focusing on
different areas of industry.  The development
of advanced manufacturing space as part of
AMIC, will attract inward investment to the
Ayrshire Region.
• Set up referral routes from the project
• Working group oversees both projects
and responsible for integration.
• Sharing of information and joint
discussions with NMIS to ensure a
collaborative approach and avoid
duplication. 
• Sharing of learnings and studies which
would benefit or transfer across sub
sectors to benefit the wider
manufacturing sector in Ayrshire. 
• Sharing of information and resource. 
• Collaboration on projects which can be
developed with mass benefit to the wider
manufacturing sector in Ayrshire.
• Provision of flexible space in both North and
East Ayrshire which will drive inward
investment to the area providing greater
choice to investors and collaborative working
across the councils.  
426

Page 427

NAC Growth and Investment 
AGD Business Case 
85
APPENDIX C: BENEFITS REALISATION LOGIC CHAIN 
Project Inputs
(resources)
Project Activities (what you
do)
Project Outputs (what is
produced)
Project Outcomes (change expected as
result of outputs/activities)
Programme Objective 
AGD £15million
Scot Govt £11M 
NAC £4M 
Local
Regeneration
Fund (formerly
LUF3) £4.706M 
Vacant &
Derelict Land
Fund (VDLF) 
£0.967M
• Planning applications
submitted
• Site remediation work
• New link/access roads
developed
• Construction of
SUDS/sewerage systems 
• Improved junctions to
enhance access to sites
• New junctions to open up
access to sites
• Construction of flexible
business space in phases. 
• Total Area reclaimed,
(re)developed or assembled (20
Ha) as a result of the project
• Total Area of Opportunity Sites
(20 Ha)
• New Industrial & Business
Space (6,000sq m)
• Individuals supported into work
• Private businesses supported
• Jobs safeguarded
• Wide range of employment
opportunities
• Improved pedestrian linkages 
• Vacant and Derelict Land
brought back into use/removed
from SVDL Register (20 ha)
• Flexible business space for
start-up or needs
• Well-connected flexible
business space within close
proximity to central belt region
supply chains and workforce 
• Altered perception and market sentiment
in regard to Ayrshire’s advance
manufacturing and digital offer
• Improved market sentiment
• 20 Ha land unlocked for development
• Increased levels of investment, including
FDI 
• Uplift in commercial rental/sales values
(£)
• Increased supply of commercial space 
• Strengthening key business clusters 
• Increased employment and
development of skills in local workforce
• Increased GVA 
• Reduced levels of deprivation in local
areas 
• Enhanced accessibility - employment/
business locations
• Widening of labour market
• Improved business productivity
• Strengthening key business clusters 
• Businesses attracted to the locality and
increase in inward investment
• Reduction in level of vacant and derelict
land
• 18-35 People from Employability & Skills
Programme Accessing Jobs
• Sustainable work location with services
and amenities to support employees
(e.g. child care/creche facility/café/retail)
• Increase employment opportunities 
• Increase in GVA across region
• Lever in private sector investment
• Spread the benefits of economic growth
across region, ensuring deprived areas
benefit from this growth.
• Job market entrants and low skilled workers
increasing soft and basic skills through
provision of local jobs 
• Attract skilled workers to the region and
support local people entering skilled
employment opportunities 
427

Page 428

NAC Growth and Investment 
AGD Business Case 
86
APPENDIX D: ECONOMIC MODELLING, i3 FLEXIBLE
SPACE PHASE 2 
The following tables and information set out the approach to and findings of economic
modelling for the Flexible Space Phase 2 project. 
Flexible Space, Phase 2 – Options Summary 
Option  Description  Narrative 
Option 1
Business as
usual 
Do Nothing
(Counterfactual)
DISCOUNTED 
It is estimated that the percentage of economic activity
generated within the project area without any investment
i.e. Deadweight, would be 0%.
Option 2:
Single Unit 
Deliver one 1,690 sqm
(18,191 sqft) GIFA unit
by 30 June 2027, with
occupancy starting 01
April 2028. 
PREFERRED OPTION. 
Delivers additional space with a realistic timeline for
occupation. In addition, Options for positive and negative
sensitivity are provided. 
Option 2a: 
Single Unit 
Preferred Option
Positive Sensitivity
DISCOUNTED 
• Fully occupied earlier – 01 October 2027
• Increased rateable rate from £75 per sqm to £85
per sqm
• Decrease Leakage and Displacement
additionality operational factors. 
Leakage 
Current 
Leakage 
Decrease
Displace-
ment 
Current
Displace-
ment 
Decrease
LA 40% 30% 5% 0%
GCR 20% 15% 10% 5%
Scotland  0% 0% 0% 0%     
Option 2b:
Single Unit 
Preferred Option
Negative Sensitivity 
DISCOUNTED 
• Fully occupied later – 01 October 2028
• Decreased rateable rate from £75 per sqm to £65
per sqm
• Increased Leakage and Displacement
additionality operational factors 
Leakage 
Current 
Leakage 
Increase
Displace-
ment 
Current
Displace-
ment 
Increase 
LA 40% 45% 5% 10%
GCR 20% 30% 10% 15%
Scotland  0% 5% 0% 5% 
Option 3:
Subdivided
Unit 
Deliver 1,630 sqm
(17,544 sq ft) GIFA of
space subdivided into
4 lettable units by 30
June 2027 with 100%
occupancy by 01 April
2029.
DISCOUNTED OPTION. 
Delivers one unit subdivided into smaller units, some of
which may be filled quicker but not necessarily all of
them, meaning that 100% occupancy is likely to be
achieved later. This option may take slightly longer to
deliver due to the difference in format. There is more
need for larger units and the main cost of the
development is being funded through LUF 3, for which
the business case and format of the unit has already
been agreed and aligns with the Preferred Option. 
Option 4:
Terraced
Units 
Deliver Flex Space
Phase 3 earlier by 31
March 2028, which
DISCOUNTED OPTION. 
Delivers Phase 3 Flex Space earlier which are two sets of
smaller terraced incubation units. This option is
428

Page 429

NAC Growth and Investment 
AGD Business Case 
87
includes two sets of
terraced units totaling
1,068 sqm (11,496 sq
ft) with 100%
occupancy by 
1 April 2029.
discounted as it would take longer to deliver as it has not
yet reached the end of RIBA Stage 4, like Option 2, could
take longer to achieve 100% occupation and the majority
of the development is supported by LUF 3 which requires
the business case and format of the unit to align with the
Preferred Option. 
Option 5:
Smaller
unit, LUF 3 
Deliver a smaller
single unit within the
LUF 3 budget cost
envelope (estimated at
1,281 m2) by 30 April
2027 with full
occupancy by 01
January 2028. 
DISCOUNTED OPTION. 
Delivers a smaller unit only funded by LUF3 funds, that
could be delivered earlier ie 30 April and enables
additional AGD funds to be reallocated from Phase 2 to
Phase 3. This development could be delivered slightly
earlier but would not meet the agreed floorspace level
approved by LUF 3. In addition, the project is already
advanced based on the preferred option and is at tender
stage. 
Additionality Approach 
2.0 Introduction 
This note has been prepared to explain the approach to considering additionality for the
purposes of economic modelling for Phase 2 of the Ayrshire Growth Deal Flexible Advanced
Manufacturing Space project at i3 Business Park in Irvine. The project proposes an
estimated investment of £6.775M in a single 18,191 sq ft (1,690 sq m) industrial unit with
related yard space and parking, funded by Levelling Up Fund 3 (£4.7M) and Ayrshire Growth
Deal (£2.069M). In this respect, benefits are estimated in relation to construction,
operational, land value uplift and carbon accounting. 
2.1 Counterfactual Assessment and Deadweight 
It’s unlikely that any or very limited outputs/outcomes would be secured without the
intervention of the project’s investment through the public sector, as there is market failure
within the area. This means that there is no incentive for the market to deliver modern
industrial units. New, similar developments taking place within the locality have been
supported by the public sector with little or no historical development / investment from the
private sector in this type of project. The significant gap between the construction costs and
asset value is demonstrated in a valuation undertaken for the project by Ryden in December
2024. The valuation estimated the market value of £1,304,000 for the unit, in comparison to
the estimated construction costs, which at the time were estimated to be £6,156,300. In this
respect, it is estimated that the percentage of economic activity that would have been
generated within the project area without any investment i.e. the Deadweight, would
be 5% for North Ayrshire, Ayrshire and Scotland, given the challenges that the private
sector face in delivering commercial floorspace. 
2.2 Construction Benefits 
The project is estimated to generate nearly £6M in construction related benefits through the
creation of an industrial unit and related land remediation, following investment in Phase 1.
The main investment activity takes place during years 2026/27 and 2027/28, after which
some revenue costs are anticipated until the unit is let. It is assumed these revenue costs
will be in the region of £67,500. In this respect the project investment profile is as follows: 
Construction
Spend 
Total
Spend
Year 4 Year 5
24/25
Year 6
25/26
Year 7
26/27
Year 8
27/28
Capital spend  £6.775M £0.051m £0.305M £0.132M £2.068M £4.220M
Revenue
spend 
£0.0675M  £0 £0 £0 £0.0675M
Total  £6.8425M £0.051M £0.305M £0.132M £2.068M £4.2875M
429

Page 430

NAC Growth and Investment 
AGD Business Case 
88 
Follow on investment from the tenant is anticipated in terms of fit out costs which are
assumed at £500,000 as a rough estimate. There may also be the potential for the tenant to
extend the building as the format allows for this, although this is assumed to be unlikely for
the moment due to the high cost of construction.   
2.2.1 Construction Leakage
The works involve the construction of an industrial unit for which there are probably only a
few companies based locally (i.e. within Ayrshire) that could tender for this work, as it is
considered to be quite specialised.  If the appointed contractor for the works is not based
locally, it is assumed that a very small percentage of construction activity will be delivered by
local businesses that employ local labour.  This was the scenario for Phase 1 Flex Space, as
the contractor was based in Fife and so there were limited job opportunities for local people
with the main contractor but more opportunities related to sub-contracts locally.  However, if
the company awarded the tender is locally based, this could make a significant difference to
the level of construction activity employing local labour. 
2.2.2 Construction Displacement
It is assumed that there will be lower levels of displacement due to lower competition within
the Ayrshire area, as there are not many local contractors within North Ayrshire and the
wider Ayrshire area that specialise in constructing industrial units. 
2.2.3 Construction - Economic Multipliers
It is considered that local business within North Ayrshire will act as a supply chain for the
construction of the industrial unit. For example, within the following trades of groundworks,
fencing, plumbing & heating, joinery, roofing. In addition, community benefits will be included
within the contract to encourage the successful contractor to take on for example local
apprentices. 
2.2.4 Construction Benefits – Additionality Factors 
To summarise, for the project and the preferred option, the additionality factors are set out in
the table below. In addition, the same percentages have been applied to the other options.
Please see overall table in Appendix 1 and comparison to AEP OBC Additionality Factor
percentages in Appendix 2.   
Construction Benefits
Additionality Factors:  Leakage (%) Displacement (%) Multipliers Deadweight (%)
North Ayrshire  30% 10% 1.2 5%
Ayrshire 20% 20% 1.5 5%
Scotland  5% 10% 1.8  5% 
• Leakage - the extent to which the construction benefits of the project will leak out of
the target area into other areas are estimated to be 30% for North Ayrshire, 20% for
Ayrshire and 5% for Scotland.  
• Displacement - the extent to which an increase in the intended construction benefits
is offset by reductions in economic activity elsewhere in the economy is estimated to
be low and 10% for North Ayrshire and Scotland and 20% for Ayrshire. 
• Economic Multipliers – the wider economic benefits generated through the project
into the economy are likely to be 1.2, 1.5 and 1.8 respectively. 
• Deadweight is estimated to be 5% across North Ayrshire, Ayrshire and Scotland
because a very small number, if any, of the economic construction benefits of the
project would've happened without this intervention. 
430

Page 431

NAC Growth and Investment 
AGD Business Case 
89
2.3 Operational Benefits 
The project will create commercial floorspace which has planning permission for use classes
4, 5 and 6.  The unit is speculative, so at this time it is not known what business will occupy
the building and what the operational benefits could be in terms of how many people will be
employed and what GVA it will generate. 
• Leakage - a comparison has been made with the percentages for the AEP OBC
which were 40% for East Ayrshire, 15% for Ayrshire and 0% for Scotland for all
options that included commercial floorspace. For this project its considered that the
figures could be 40% for North Ayrshire, 20% for Ayrshire and 0% for Scotland for all
options.  
• Displacement - the extent to which an increase in the intended operational benefits is
offset by reductions in economic activity elsewhere in the economy is estimated to be
low and 5% for North Ayrshire, 10% for Ayrshire and 0% for Scotland – taking a
similar approach to those percentages applied to the AEP OBC. 
• Economic Multipliers –Reflecting other similar projects in the Ayrshire region and as
a conservative estimate a multiplier of 1.1 have been applied which is the same as
the AEP OBC. 
• Deadweight is estimated to be 5% across North Ayrshire, Ayrshire and Scotland
because a very small number, if any, of the operational benefits of the project
would've happened without this intervention. 
Operational Benefits 
Additionality Factors:  Leakage (%) Displacement (%) Multipliers Deadweight (%)
North Ayrshire  40% 5% 1.0 5%
Ayrshire 20% 10% 1.0 5%
Scotland  0% 0% 1.0  5% 
Options Narrative for Modelling 
Option 2: Single Unit, Preferred Option, plus Options 2a & 2b (Sensitivity) 
Description  Narrative 
Deliver one 1,690 sqm
(18,191 sq ft) unit by 30
June 2027, with occupancy
starting 01 April 2028. 
PREFERRED OPTION. Delivers additional space with a realistic
timeline for occupation. In addition, Options for positive and negative
sensitivity are also provided below comprising of:
Option 1a (positive) – fully occupied by 1 October 2027 (positive)
Rateable rate at £85 per sqm
Leakage and Displacement Additionality Operational factors
decreased to the following: 
Leakage Decrease Displacement Decrease 
LA 30% 0%
GCR 15% 5%
Scotland  0% 0% 
Option 1b (negative) – fully occupied by 1 October 2028 (negative)
Rateable rate at £65 per sqm
Leakage and Displacement Additionality Operational factors
decreased to the following: 
Leakage Increase Displacement Increase 
LA 45% 10%
GCR 30% 15%
Scotland  5% 5% 
431

Page 432

NAC Growth and Investment 
AGD Business Case 
90 
• Assumes single unit, not subdivided. 
• Design and build contract awarded June 2026.
• Unit completed by 30 June 2027.
• Fully occupied starting 01 April 2028. This time period allows for approximately 9
months (July 27 to March 28 inclusive) for conclusion of marketing period, Cabinet
agreement to lease disposal and subsequent conclusion of the lease agreement. 
• Assumes operational year of unit would start in financial year 28/29 ie April 2028 
MODELLING
SPREADSHEETS 
INFORMATION / ASSUMPTIONS 
Costs Capital cost estimates for design, consultancy and contract costs are
grouped together. 
Assumes private sector fit out costs of £500,000. 
Revenue costs assume costs incurred by NAC from handover from
contractor to occupancy by lessee, ie, costs from July 2027 to March 28 (9
months). This would comprise of the following costs per annum based on
previous estimates for the project: 
Electricity and standing charges £60,000 
Maintenance    £10,000
Landscaping    £10,000
Insurance     £5,000
Water     £5,000
Total annual charges   £90,000
This equates to £7,500 per month and £67,500 for 9 months. 
Construction
Benefits 
Assumes design development takes place 24/25, 25/26 and construction
takes place 26/27 and part of 27/28.
Assumes private sector fit out costs of £500,000. 
Operational
Benefits
Assumed light industrial, with full occupancy by April 2028. 
NDR Based on Ryden rental valuation from Dec 2024 of £127,400. Assumes
100% rates relief in first year of occupancy from April 2028 til March 2029.
Works out at a rateable value of £75 per square metre. 
Additionality Factors percentages are assumed to reflect the Operational
Benefits. 
Housing Benefits N/A
Council Tax N/A
Energy
Consumption
Assumes energy consumption of 200,000 kwh (or when building operational,
based on estimates for Phase 1. Assumes energy consumption of 538 kwh
per month (6,456 kwh per annum) when building unoccupied, based on
average taken from invoices for Phase 1 when unoccupied. 
Assumes lower energy consumption between July 2027 and March 2050
which is 4,842 kwh (ie 538 kwh per month for 9 months). 
Assumes energy consumption 200,000 kwh per annum (or 16,667 kwh per
month) from April 2028 onwards.   
Proposed solar PV panels will help off-set emissions. 
Option 2: Sensitivity Testing – Occupation – Positive & Negative Scenarios 
Additional modelling sheets have been provided that have considered the following
variations on Option 1 related to when the unit is fully occupied. 
432

Page 433

NAC Growth and Investment 
AGD Business Case 
91
Option 2a – fully occupied by October 2027 (positive)
This Positive Sensitivity Option assumes that the unit will be occupied earlier by October
2027 rather than by April 2028. This means there will be less revenue costs for the Council
between the handover and letting period i.e. three months of revenue costs at an estimated
£22,500. In addition, the unit will be operational within an earlier financial year 27/28, with
the Council receiving rental income at an earlier stage. 
The rateable value of the Unit once occupied is assumed to increase to £85 per sqm, an
increase of £10 per sqm when compared to the preferred option of £75 per sqm. 
Leakage and Displacement Additionally factors related to the operation of the Unit are
adjusted downwards, with the percentage rate across all three geographical spatial defined
areas when compared to the preferred option. 
Assumes lower energy consumption between July 2027 and Sept 2027 which is 1,614 kwh
(ie 538 kwh per month for 3 months) and from Oct 27 til March 28, 100,002 kwh based on 6
months operational, providing a total of 101,616 kwh consumption for 2027/28.   
Option 2b – fully occupied by October 2028 (negative)
This Negative Sensitivity Option assumes that the unit will be occupied later by October
2028 rather than by April 2028. This means there will be more revenue costs for the Council
between the handover and letting period i.e. 15 months of revenue costs at a total of
£112,500 (£67,500 in 27/28 and £45,000 in 28/29). In addition, as the unit will be operational
later, the Council will begin to receive rental income at a later date.   
The rateable value of the Unit once occupied is assumed to decrease to £65 per sqm, a
decrease of £10 per sqm when compared to the preferred option of £75 per sqm.
Leakage and Displacement Additionally factors related to the operation of the Unit are
adjusted upwards, with the percentage rate across all three geographical spatial defined
areas when compared to the preferred option. 
Assumes lower energy consumption between July 2027 and Sept 2028 which is 8,070 kwh
(ie 538 kwh per month for 15 months) and from Oct 28 til March 2029, 108,172 kwh based
on 6 months operational, providing a total of 101,616 kwh consumption. This works out:
energy consumption of 9 months during 2027/28 (Jul 27 to Mar 28) of 4,842 kwh and energy
consumption during 2028/29 of 6 months of low energy consumption of 3,3228 kwh (Apr 28
to Sept 28) and 6 months of high energy consumption once the unit is occupied from
October 2028 (100,002 kwh) giving a total of 103,230 kwh. 
Leakage 
Current 
Leakage 
Decrease
Displacement 
Current
Displacement 
Decrease
Multipliers  Deadweight
LA 40% 30% 5% 0% 1.0 5%
GCR 20% 15% 10% 5% 1.0 5%
Scotland  0% 0% 0% 0% 1.0 5% 
Leakage 
Current 
Leakage 
Increase
Displacement 
Current
Displacement 
Increase 
Multipliers  Deadweight
LA 40% 45% 5% 10% 1.0 5%
GCR 20% 30% 10% 15% 1.0 5%
Scotland  0% 5% 0% 5% 1.0 5% 
433

Page 434

NAC Growth and Investment 
AGD Business Case 
92
Table 39: Benefits-Cost Ratio Timeframe - 25 Year Appraisal – Sensitivity Testing of Single Unit 
Table 40: Benefits-Cost Ratio Timeframe - 25 Year Appraisal (Construction Impacts Removed) -
Sensitivity Testing of Single Unit 
The sensitivity testing of the preferred option to assess its robustness has demonstrated that
through amendments of the occupation of the built unit, ratebale rates and Additionality
factors during operation will change significantly the Ayrshire BCR of the proposal. An
accumulation of the Negative alterations reduces the BCR to £8.62:£1, whilst accelerating
occupation, increasing rateable rates and softening of Additional factors heightens the BCR
to £11.02:£1. In the meantime, the number of construction and occupational jobs generated
changes principally in response to the positive alterations with an uplift in Ayrshire jobs to 29.
Elsewhere significant change is translated to expected operational GVA generated with a
positive action uplifting the GVA potential to £80.332m when compared against benchmark
preferred option of £67.318 (at an AGD level). 
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit-Pref Option Pref Option Sensitive +A Pref Option Sensitive -B
PV of Capital Costs All Geographies £0 £6,806,267 £6,806,267 £6,806,267
PV of Revenue Costs All Geographies £0 £847,851 £735,412 £815,476
PV of Total Costs All Geographies £0 £7,654,118 £7,541,679 £7,621,744
Local Authority £0 41 41 41
Ayrshire Growth Deal £0 53 53 53
Scotland £0 84 84 84
Local Authority - £2,247,803 £2,247,803 £2,247,803
Ayrshire Growth Deal - £2,854,353 £2,854,353 £2,854,353
Scotland - £4,575,885 £4,575,885 £4,575,885
Local Authority £0 19 24 19
Ayrshire Growth Deal £0 26 29 26
Scotland £0 34 34 34
Local Authority - £50,628,932 £66,156,308 £47,497,335
Ayrshire Growth Deal - £67,318,248 £80,332,659 £63,154,351
Scotland - £88,822,688 £94,509,011 £83,328,657
Actual 0 £491,064 £491,064 £491,064
Net Impact - £491,064 £491,064 £491,064
Local Authority - £6.90 £9.04 £6.48
Ayrshire Growth Deal - £9.16 £11.02 £8.62
Scotland - £12.19 £13.16 £11.52
Person Years of Construction
Employment
Present Value of Net Additional
Construction GVA
Benefit Cost Ratio
Full-time Equivalent Jobs
Present Value of Net Additional
Operational GVA
PV of GHG Carbon Accounting
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit-Pref OptionPref Option Sensitive +APref Option Sensitive -B
PV of Total Costs All Geographies £0 £7,654,118 £7,541,679 £7,621,744
Local Authority £0 £52,810,691 £68,190,851 £49,375,641
Ayrshire Growth Deal £0 £70,106,557 £83,096,150 £65,701,606
Scotland £0 £93,332,529 £99,222,509 £87,789,321
Local Authority - £50,562,888 £65,943,047 £47,127,837
Ayrshire Growth Deal - £67,252,204 £80,241,797 £62,847,252
Scotland - £88,756,644 £94,646,624 £83,213,435
Actual 0 £491,064 £491,064 £491,064
Net Impact - £491,064 £491,064 £491,064
Local Authority - £6.61 £8.74 £6.18
Ayrshire Growth Deal - £8.79 £10.64 £8.25
Scotland - £11.60 £12.55 £10.92
Present Value of Net Direct GVA
Present Value of Net Additional
GVA
PV of GHG Carbon Accounting
Benefit Cost Ratio
434

Page 435

NAC Growth and Investment 
AGD Business Case 
93
Option 3: Subdivided Unit 
Description  Narrative 
Deliver 1,630 sqm (17,544
sq ft) of space subdivided
into 4 lettable units by 30
June 2027 with 100%
occupancy by 01 April
2029.
DISCOUNTED OPTION. Delivers smaller units within the same
timescale, some of which may be filled quicker but not necessarily all
of them, meaning that 100% occupancy is likely to be achieved later.
There is evidence of more need for larger units and the main cost of
the development is being funded through LUF 3, for which the
business case and format of the unit has already been agreed and
aligns with the Preferred Option. 
• Assumes four units with a rateable value of £8.50 per sq ft based on previous
Colliers valuation.
• Estimated revenue costs based on benchmark from Annickbank proposals (3 units at
500m2, total estimated annual revenue costs whilst vacant are £45,000) works out
four units just over 400m2 each with overall annual revenue vacancy costs of
£48,000 (£12k per unit per annum) 
Unit  Size 
sq ft (GIA)
Size 
sq m
Rental Value  Occupancy Date  Revenue
Costs period
Est Rev
costs 
1 4,445 413 £37,782.50 01 Oct 27 3 months  £3,000
2 4,445 413 £37,782.50 01 Apr 28 9 months  £9,000
3 4,327 402 £36,779.50 01 Oct 28 15 months  £15,000
4 4,327 402 £36,779.50 01 Apr 29 21 months  £21,000 
Electricity Consumption assumptions 
Unit  Size 
sq ft (G
Size 
sq m
Occupancy
Date 
Vacant kwh
27/28
Occupied
kwh 27/28
Vacant kwh
28/29
Occupied
kwh 28/29
1 4,445 413 01 Oct 27 501 kwh 25,002  N/A 50,000
2 4,445 413 01 Apr 28 1,503 kwh N/A N/A 50,000
3 4,327 402 01 Oct 28 1,503 kwh N/A 1,002 25,002
4 4,327 402 01 Apr 29 1,503 kwh N/A 2,004 N/A 
MODELLING
SPREADSHEETS 
INFORMATION / ASSUMPTIONS 
Costs Capital cost estimates for design, consultancy and contract costs are
grouped together. 
Assumes construction costs include a level of fit out works. 
Private sector costs of £500,000 assumed for fit out. 
Revenue costs assume costs incurred by NAC from handover from
contractor to occupancy by lessee, ie, costs from July 2027. 
Estimated revenue costs based on benchmark from Annickbank proposals
(3 units at 500m2, total estimated annual revenue costs whilst vacant are
£45,000). 
Constructions
Benefits
Construction costs and programme – are the same as the preferred option -
design and build contract awarded June 2026 and units completed by 30
June 2027. 
Assumes construction costs also include a level of fit out works. 
Assumes private sector fit out costs of £500,000.
Fully occupied, starting from 01 April 2029. 
This extended time period allows for a longer timescale to market all four
units and for the subsequent conclusion of the lease agreements. It’s
435

Page 436

NAC Growth and Investment 
AGD Business Case 
94
assumed that the individual rental values would below the threshold for
seeking Cabinet approval as part of this process. 
Assumes design development takes place 24/25, 25/26 and construction
takes place 26/27 and part of 27/28. 
Operational
Benefits
Assumed light industrial, with full occupancy by 01 April 2029.
NDR Colliers valuation of Phase 1 from June 2022 provided a scenario for sub-
division into 4 units at a total of 17,544 sq ft or 1,630 m2, with a completed
development value of £2,095,000, assuming an overall market annual rent
of £149,200 per annum at £8.50 per sq ft or £91.50 per sq m. 
Assumes value of each unit would sit below the 100k value at £37k to £38k.  
Additionality Factors percentages are assumed the same as for the
Operational Benefits spreadsheet.
Housing Benefits  N/A
Council Tax N/A
Energy
Consumption
Assumes energy consumption for a light industrial unit of c410m2 would be
approximately 50,000 kwh per year or 4,167 kwh per month when
operational. 
Assumes when non-operational/vacant, the consumption would be 2,000
kwh per annum or 167 kwh per month. 
Please see assumptions table above. 
Option 4: Terraced Units 
Description  Narrative 
Deliver Flex Space Phase 3
which includes two sets of
terraced units totaling 1,068 sqm
(11,496 sq ft) delivered by 31
March 2028 and with full
occupancy by 01 April 2030.
DISCOUNTED OPTION. Delivers Phase 3 Flex Space earlier
which includes two sets of smaller terraced incubation units.
This option is discounted as it would take longer to deliver as it
has not yet reached the end of RIBA Stage 4 (like Option 2), it
could take longer to achieve 100% occupation and the majority
of the development is supported by LUF 3 which requires the
business case and format of the unit to align with the Preferred
Option and the certainty of LUF3 funds being spent within a
required timeline. 
Assumes the following: 
Terrace*  Size 
sq ft (GIA)
Size 
sq m
Rental Value  Occupancy
Date 
Revenue
Costs period
Est Rev
costs 
3A 6,907.26 641.7 £58,711.71 01 Apr 2029 12 months  £12,000
3B 4,588.70 426.3 £39,003.95 01 Apr 2030 24 months  £24,000 
• terrace 3A – capable of subdivision into 6 units with a combined floorspace of 641.7m2
(6,907.26 sq ft) fully occupied by 01 April 2029. 
• terrace 3B – capable of subdivision into 4 units with a combined floorspace of 426.3m2
(4,588.70 sq ft) fully occupied by 01 April 2030.
• Rateable value of £8.50 per sq ft based on previous Colliers valuation.
• Estimated revenue costs based on benchmark from Annickbank proposals (3 units at
500m2, total estimated annual revenue costs whilst vacant are £45,000) works out four
units just over 400m2 each with overall annual revenue vacancy costs of £48,000 (£12k
per unit per annum) 
436

Page 437

NAC Growth and Investment 
AGD Business Case 
95
MODELLING
SPREADSHEETS 
INFORMATION / ASSUMPTIONS 
Costs Capital cost estimates for design, consultancy and contract costs are
grouped together. 
Revenue costs assume costs incurred by NAC from handover from
contractor in March 2028 to occupancy by businesses, i.e. revenue costs
as follows: 
Unit 3A – revenue costs from 01 Apr 2028 to March 2029 (12 months)
when fully occupied 
Unit 3B – revenue costs from 01 Apr 2028 to March 2030 (24 months)
when fully occupied 
Constructions
Benefits
Whilst overall floorspace is smaller, this option assumes construction costs
are the same, as two individual terraces are being created. 
Assumes contract works commence later than July 2026 and starts Jan
2027, as design has not reached RIBA Stage 4, statutory consents
required and tender pack not prepared. Estimate completion by 31 March
2028, full occupation of terrace 3A by 01 April 2029 and full occupation of
terrace 3B by 01 April 2030. 
Operational
Benefits
Assumes:
• terrace 3A –capable of subdivision into 6 units with a combined
floorspace of 641.7m2 (6,907.26 sq ft) fully occupied by 01 April 2029
• terrace 3B – capable of subdivision into 4 units with a combined
floorspace of 426.3m2 (4,588.70 sq ft) fully occupied by 01 April 2030. 
NDR Assumes 100% rates relief in year 1
Additionality Factors percentages are assumed the same as for the
Operational Benefits spreadsheet.
Housing Benefits  N/A
Council Tax  N/A
Energy
Consumption
Assumes energy consumption for unit 3A is low kwh estimate for 2028/29
(3,006 kwh per annum) when unit vacant and being marketed, with full
energy consumption starting in 2029/30 (75,000 kwh per annum) when unit
becomes occupied. 
Assumes energy consumption for unit 3B 426.3m2 is low kwh estimate for
2028/29 (2,004 kwh per annum) and 2029/30 (2,004 kwh per annum) when
unit vacant and being marketed with full energy consumption starting
2030/31 (50,000 kwh per annum) when unit becomes occupied. 
Option 5: LUF 3 Cost Envelope 
Description  Narrative 
Deliver a single unit within the
LUF 3 budget cost envelope
by 30 April 2027 with full
occupancy achieved by 01
January 2028. 
DISCOUNTED OPTION. Delivers a smaller unit only
funded by LUF3 levered funds, which could be delivered
earlier and enables additional AGD funds to be
reallocated from Phase 2 to Phase 3. This development
could be delivered earlier but would not meet the agreed
floorspace level approved by LUF 3. 
This scenario would be based on the following assumptions: 
• Project overall construction spend would require to be within the LUF3 funding cost
envelope which is £4,706,259 rather than the preferred option which is £6,775,000. 
• Cost estimate: 
437

Page 438

NAC Growth and Investment 
AGD Business Case 
96
Design, PM & consultants fees £394,259
Main contractors  £4,100,000 
Site investigation  £21,000
Utilities  £125,000
Planning and Building warrant fees  £20,000
Other contractors (tree clearance) £30,000
Other capital expenditure  £15,000
Total  £4,705,259 
• Floorspace estimate of 1,281m2 (13,788 sq ft) could be achieved based on
£4,100,000 available main contractors budget divided by estimate cost of £3,200 per
square metre. Similar to floorspace scale being created at Kyle Road (1,200m2 based
on £4.56K budget). 
MODELLING
SPREADSHEETS 
INFORMATION / ASSUMPTIONS 
Costs Sheet  Capital cost estimates for design, consultancy and contract costs are
grouped together. Assumes same spend for preferred option 24/25, 25/26
with majority of spend during 26/27 and smaller allocation in 27/28 to cover
retention and other potential costs. 
Assumes private sector costs of £300,000 for fit out. 
Revenue costs assume costs incurred by NAC from handover from
contractor to occupancy by lessee, ie, costs from May 2027 to January
2028 (8 months). This would comprise of the following costs per annum
based on preferred option estimates with some adjustments as the unit is
smaller: 
Electricity and standing charges £50,000
(assume pay almost the same) 
Maintenance    £7,000
Landscaping    £7,000
Insurance     £4,000
Water     £4,000
Total annual charges   £72,000
This equates to £6,000 per month and £48,000 for 8 months.
Constructions
Benefits 
Assumes design development takes place 24/25, 25/26 and construction
takes place 26/27. 
Assumes private sector costs of £300,000 for fit out. 
Operational
Benefits
Assumed light industrial with full occupancy by January 2028. 
NDR  Based on Ryden valuation from Dec 2024 works out at a rateable value of
£75 per square metre. Assumes 100% rates relief in first year of occupancy
from January 2028 til December 2028. 
Additionality Factors percentages are assumed the same as for the
Operational Benefits spreadsheet.
Housing Benefits  N/A
Council Tax  N/A
Energy
Consumption
Assumes energy consumption for the unit is low kwh estimate from
completion date of 30 April 2027 to occupancy by 01 January 2028 ie 8
months and 3 months at full consumption from January to March 2028. 
Consumption estimates are based on 75% of preferred option low
estimates 538 kwh per month and high estimates 16,667 kwh per month (ie
404 kwh and 12,005 kwh) 
8 months at low is 3,232 kwh and 3 months at high is 36,015 kwh 
Total is 39,247 kwh for 2027/28
Total for 2028/29 is 144,060 kwh 
438

Page 439

NAC Growth and Investment 
AGD Business Case 
97
Background to Economic Modelling 
The economic modelling for the Phase 2 Flexible Space options has been quantified using
the Glasgow City Region Intelligence Hub’s Business Case Economic Model (BCEM).
BCEM was developed following the methodology outlined within the GCR’s Programme
Management Toolkit. 
This approach quantifies Benefit-Cost Ratios (BCRs) using a HM Treasury Green Book
approved methodology and has been used for successful Glasgow City Region City Deal
business cases and Levelling Up Fund applications. 
The benefits that are quantified within BCEM can fall under the broad headings of
Construction, Operational, Housing, and Greenhouse Gas Emissions. Each monetary
benefit is then subject to HM Treasury’s preferred discount rate of 3.5%, moving to 3% after
a 30-year appraisal period, to obtain Present Values (PV). 
As per HM Treasury Green Book compliance, a Counterfactual, otherwise known as a “do
nothing”, scenario is initially established before identifying the costs and benefits of any
subsequent appraised intervention. 
The PV of an intervention’s cumulative benefits are then re-calculated as Net Additional
benefits by subtracting any economic benefits generated in the Counterfactual scenario. A
Benefit-Cost Ratio is then established by dividing the PV of Net Additional Benefits by the
PV of Total Costs. 
For the purposes of modelling for this Ayrshire Growth Deal investment, spatial adjustment
analyses have not been quantified. Spatial adjustment analysis can be used to quantify the
disproportionate impacts that an investment can have on communities with non-typical levels
of productivity or earnings potential. Such disproportionate impacts are not anticipated to
occur from this investment. 
Estimated Benefits and Costs 
METHODOLOGY
This cost benefit analysis has employed appraisal techniques that are consistent with those
outlined in HM Treasury Green Book (HM Treasury, 2022). It considers the range of socio-
economic impacts that the project is forecast to generate at the Local Authority, Growth Deal
Area, and Scotland Geographic levels within the 25-year project appraisal period. This
timeframe aligns with the economic appraisal undertaken at OBC stage and ensures
consistency with the approach adopted by the Glasgow Intelligence Hub for economic
analysis across Ayrshire Growth Deal projects. The timeframe is consistent with estimated
asset lifespans and servicing and maintenance plans. Whilst the modelling has stated a 25
year lifespan, the lifetime of the unit is expected to be longer, due to the quality of the design
and construction including sustainable features. 
The economic outputs for each option displayed within Table 41 below are as of March
2026. As the project develops, these outputs will be updated to take account of current
evidence, changes to the project scope and the associated financial case. 
Costs were estimated based on benchmarking with other Local Authorities and
organisations, feasibility studies and high-level costings from contractor’s and consultants
and evidence of past work examples. Figures have been adjusted for BCIS all in TPI
(Tender Price Index). Consideration is also being given to the cost impact of the buildings
meeting the Scottish Government Net Zero Buildings Standard. 
439

Page 440

NAC Growth and Investment 
AGD Business Case 
98 
OPTIMISM BIAS
The project budget has a significant level of contingency and continues to be given
consideration. Consideration was also given to previous North Ayrshire Council Phase 1
project, now completed spring 2026. 
BCR CALCULATION EXPLANATION
BCRs have been calculated by dividing the PV Net Additional GVA for each option (minus
the PV Carbon Accounting) by the PV Total Cost.
• The Single Unit at Local Authority Geography:
• Net Additional GVA: £2.102m (Construction) + £50.628m (Operational) - £0.039m
(Carbon) = £52.691m
• Divided by the PV Total Cost of £7.654m
• Equals a BCR of £6.91 over a 25-year appraisal period at the local authority level.
BCR Analysis:
The analysis illustrates the robustness of the project and its projected ability to generate
significant economic growth at a local and regional level. This includes not only
demonstrating VfM from the public sector investment but also enable the delivery of both
39 construction and 19 operational jobs. 
25-Year Appraisal
Table 41: Economic Outputs – Overall value for money assessment 
The analysis above identifies the overall value for money assessment benefits that could be
achieved through investment in Flexi Space Phase 2 in and around the Ayrshire area. 
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit Sub divided Unit Terraced Unit Small Unit + LUF
PV of Capital Costs All Geographies £0 £6,806,267 £6,817,997 £6,204,841 £4,754,090
PV of Revenue Costs All Geographies £0 £847,851 £859,795 £823,880 £632,261
PV of Total Costs All Geographies £0 £7,654,118 £7,677,791 £7,028,721 £5,386,350
Local Authority £0 39 41 39 28
Ayrshire Growth Deal £0 49 53 49 36
Scotland £0 79 84 79 58
Local Authority - £2,102,108 £2,250,353 £2,064,459 £1,561,971
Ayrshire Growth Deal - £2,669,343 £2,857,591 £2,621,535 £1,983,455
Scotland - £4,279,291 £4,581,076 £4,202,648 £3,179,726
Local Authority £0 19 19 12 15
Ayrshire Growth Deal £0 26 25 16 20
Scotland £0 34 33 22 26
Local Authority - £50,628,932 £48,878,624 £29,253,376 £40,832,926
Ayrshire Growth Deal - £67,318,248 £64,990,968 £38,896,456 £54,293,087
Scotland - £88,822,688 £85,751,972 £51,321,713 £71,636,712
Actual 0 £39,735 £38,001 £8,963 £30,329
Net Impact - £39,735 £38,001 £8,963 £30,329
Local Authority - £6.91 £6.69 £4.49 £7.90
Ayrshire Growth Deal - £9.18 £8.88 £5.96 £10.49
Scotland - £12.22 £11.84 £7.97 £13.96
Person Years of Construction
Employment
Present Value of Net Additional
Construction GVA
Benefit Cost Ratio
Full-time Equivalent Jobs
Present Value of Net Additional
Operational GVA
PV of GHG Carbon Accounting
440

Page 441

NAC Growth and Investment 
AGD Business Case 
99 
Table 27: BCRs with Construction Impacts Removed 
Construction Benefits:
• Construction-related benefits are temporary as they only occur during the
construction period of a project. This results in person years of employment (PYE)
being created for construction jobs, rather than full-time equivalent (FTE) jobs.
Outputs are based solely on construction-related expenditure.
• Local authority-level socioeconomic data on turnover per employee and productivity
per employee (measured as gross value added per employee) are used to calculate
the PYE the construction-related expenditure creates and the output (GVA) that each
worker produces.
• Additionality assumptions including leakage, displacement, deadweight, and type ii
economic multipliers are then applied to estimate the net direct benefits of
construction-related activity at three geographic levels: local authority, growth deal
area, and national level. Details of these are already provided.
Operational Benefits:
• Operational benefits are realised through the creation of commercial floorspace and
the utilisation of that floorspace in line with recently completed Phase 1 of Flexi
Space. 
• The creation of commercial floorspace generates FTEs dependent on the final use of
the floorspace. Floorspace density coefficients recommended by the Homes &
Communities Agency are used to derive the number of FTEs per metre-squared (m2)
of floorspace created. These vary depending on the type of floorspace created – with
higher density classifications, like call centres, generating more FTEs than lower
density classifications, such as warehouses. For this Phase of Flexi Space the focus
is upon the creation of light industrial space. 
• The latest local socioeconomic data on employee productivity are then applied to the
FTEs created to calculate the economic benefit of the floorspace occupied. These
benefits are assumed to continue throughout the appraisal period selected and are
subject to the additionality assumptions aforementioned in the construction benefits
section.
Present value of monetised benefits and carbon accounting across 5-year periods to watch
the 25-year appraisal time period. 
Project Start Date: Benefit-Cost Ratio Timeframe:
2025 25 Years
2050
Option 1 Single Unit Sub divided Unit Terraced Unit Small Unit + LUF
PV of Total Costs All Geographies £0 £7,654,118 £7,677,791 £7,028,721 £5,386,350
Local Authority £0 £52,889,911 £51,374,336 £31,575,564 £42,551,916
Ayrshire Growth Deal £0 £70,246,516 £68,211,833 £41,856,541 £56,515,423
Scotland £0 £93,547,670 £90,916,429 £56,013,778 £75,208,127
Local Authority - £50,787,804 £49,123,984 £29,511,105 £40,989,946
Ayrshire Growth Deal - £67,577,173 £65,354,242 £39,235,006 £54,531,968
Scotland - £89,268,380 £86,335,353 £51,811,130 £72,028,400
Actual 0 £39,735 £38,001 £8,963 £30,329
Net Impact - £39,735 £38,001 £8,963 £30,329
Local Authority - £6.64 £6.40 £4.20 £7.61
Ayrshire Growth Deal - £8.83 £8.51 £5.58 £10.12
Scotland - £11.66 £11.24 £7.37 £13.37
Present Value of Net Direct GVA
Present Value of Net Additional
GVA
PV of GHG Carbon Accounting
Benefit Cost Ratio
441

Page 442

NAC Growth and Investment 
AGD Business Case 
100 
Table 42: Profile of Benefits Accrued – 5 Year Periods 
Green House Gas Accounting:
The table below outlines how monetised carbon savings will accumulate and increase
across five-year periods following pathfinder projects delivery. This analysis reflects the
decarbonisation potential of the interventions and long-term value of avoided emissions. This
will provide a clear framework for tracking progress against climate targets and support
evaluation of scalability of pathfinder models. 
Table 43: Green House Gas Accounting 
Inflation Level 
• All monetary values are expressed as a constant price i.e. expressed as “real price”.
The Office of National Statistics (ONS) publishes time series data for a series of price
indices, and we apply the Gross Domestic Product (GDP) deflator to present all
figures in constant prices. Note that this treatment of financial values differs from the
Financial Case. The financial case presents “nominal prices” with a 2% inflationary
rate applied. 
• The Social Time Preference Rate (STPR) has been applied at 3.5% to discount
monetary values. This rate decreases to 3% after 30 years as per HM Treasury
guidance. 
• Confirmation that BCEM utilises the latest estimates of CPI and GDP deflators
sourced from the ONS and Office for Budget Responsibility. At the time of the
modelling exercise the latest sources for each were:
GDP deflators at market prices, and money GDP September 2024 (Quarterly National
Accounts) – GOV.UK
Consumer price inflation, UK – Office for National Statistics
Distributional Analysis 
• A quantitative distributional analysis (i.e. employing welfare weighting – relative value
of jobs/income based on their geographic distribution) has not been carried out,
though distributional impacts have been considered. This project by nature has not
been designed to have specific distributional impacts on any demographic.
Additionality
• Additionality assumptions including Leakage, Displacement, Deadweight, and Type II
Economic multipliers are applied to estimate the Net Direct benefits of each
shortlisted option. Additionality assumptions have been disaggregated between both
the Construction and Operational activity taking place within the project area –
providing a greater assessment of the net additionality of the project than applying a
blanket set of assumptions across each project element.
2030 2035 2040 2045 2050
Single Unit £2,102,108 £2,102,108 £2,102,108 £2,102,108 £2,102,108
Sub divided Unit £2,250,353 £2,250,353 £2,250,353 £2,250,353 £2,250,353
Terraced Unit £2,064,459 £2,064,459 £2,064,459 £2,064,459 £2,064,459
Small Unit + LUF £1,561,971 £1,561,971 £1,561,971 £1,561,971 £1,561,971
Present Value of Construction-related Benefits - Local Authority
2030 2035 2040 2045 2050
Single Unit £20,789 £34,261 £37,837 £39,097 £39,735
Sub divided Unit £19,055 £32,528 £36,104 £37,364 £38,001
Terraced Unit £4,227 £7,595 £8,489 £8,804 £8,963
Small Unit + LUF £16,682 £26,386 £28,962 £29,870 £30,329
Present Value of GHG Accounting - Local Authority
442

Page 443

NAC Growth and Investment 
AGD Business Case 
101
• Leakage, Displacement, Deadweight, and Type II Economic multipliers have been
informed through discussion with the project team who hold local knowledge and
similar development across Scotland.
List of additionality assumptions have been used which incorporates displacement, leakage,
economic multipliers and deadweight at each geographic level for relevant appraisal criteria.
Details of the assumptions made are included within this Appendix. 
Conclusion and Quantitative Benefits 
The key findings are as follows: 
Option 1: Do nothing/minimum status quo
Do Nothing 
Option 2: Single Unit: 
• Creates 49 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 79 person years of employment in the Construction sector (Scotland) 
• Supports 26 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £67.318m in net additional GVA over 25 years, £2.669m when
construction impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a of £9.18:£1 Benefit-Cost Ratio (Ayrshire Growth Deal Region) 
Option 3: Sub Divided Unit: 
• Creates 53 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 84 person years of employment in the Construction sector (Scotland) 
• Supports 25 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £64.990m in net additional GVA over 25 years, £2.857m when
construction impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a of £8.88:£1 Benefit-Cost Ratio (Ayrshire Growth Deal Region) 
Option 4: Terraced Unit:
• Creates 39 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 49 person years of employment in the Construction sector (Scotland) 
• Supports 16 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £38.896m in net additional GVA over 25 years, £2.621m when
construction impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a positive rate of return through a £5.96:£1 Benefit-Cost Ratio
(Ayrshire Growth Deal Region) 
443

Page 444

NAC Growth and Investment 
AGD Business Case 
102
Option 5: Small Unit within LUF3 Cost Envelope 
• Creates 36 person years of employment in the Construction sector. (Ayrshire Growth
Deal Region)
• Creates 58 person years of employment in the Construction sector (Scotland) 
• Supports 20 full-time equivalent jobs through commercial development. (Ayrshire
Growth Deal Region) 
• Generates £54.293m in net additional GVA over 25 years, £1.983m when
construction impacts removed. (Ayrshire Growth Deal Region) 
• Demonstrates a positive rate of return through a £10.49: £1 Benefit-Cost Ratio
(Ayrshire Growth Deal Region) 
The BCR figures used for comparison purposes of the options are those excluding
construction impacts, as set out in Table 27. This approach ensures consistency with
appraisal guidance and allows for a like-for-like comparison across options. 
In addition to the quantitative benefits noted above, the following qualitative benefits will be
achieved through investment in Phase 2: 
Qualitative Benefits Appraisal 
The qualitative benefits were considered by the project team to evaluate the benefits.
Delivery of the Phase 2, will deliver the following: 
Table 30: Qualitative Benefits Criteria
Objectives Qualitative Benefits, Flex Space Programme  Flex Space 
Phase
Weight  
1 2 %
7. To create flexible
business space capable
of meeting
manufacturing
requirements for
chemical and life
sciences, but also for a
wide range of other high
value sectors.
• New business units will be occupied by Ayrshire/ Scottish/
UK/ overseas businesses   20
• Created/safeguarded jobs will generate economic value –
jobs, GVA, turnover for Ayrshire and Scotland  
• Supply chain outcomes will be created for other Ayrshire
and Scottish businesses  
• Design and construction contracts will generate turnover
for Ayrshire and Scottish contractors  
• Construction jobs and training outcomes will be created,
primarily for Ayrshire people and particularly drawn from
disadvantaged or Protected Characteristic groups.
 
8. Create a centre of
digital innovation which
offers digital tools,
support and innovation
scaled to a national
market supporting a
restructure of the
regional economy to
deliver advanced
manufacturing. 
• University and College presence at i3 offering training and
business development opportunities.  
20
• Cluster of R&D and spin off opportunities  
• Providing employment, skills development, community
wealth building and supply chain growth opportunities
 
• Providing the private sector with opportunities for
upskilling, business transformation and increased
productivity
 
9. To create serviced
industrial land and
capable of immediate
development.
• Development plot will be available for indigenous Ayrshire/
Scottish, UK-owned and foreign investors
ü ü 10
• Design and construction contracts will generate turnover
and jobs for Ayrshire and Scotland
ü ü
444

Page 445

NAC Growth and Investment 
AGD Business Case 
103
Objectives Qualitative Benefits, Flex Space Programme  Flex Space 
Phase
Weight  
1 2 %
10. To create
opportunities for
employment and
inclusive growth with
particular emphasis on
making connections to
local communities,
schools and colleges in
preparation for
employment, particularly
in areas of deprivation.
• New employment outcomes – direct and indirect through
supply chains  
20
• Work experience and training places for school and
college student.
ü ü
• Job market entrants and low skilled workers  increasing
soft and basic skills through provision of local jobs. 
ü ü
• Residents of deprived areas gaining access to
opportunities 
• University presence enabling additional educational and
training opportunities 
ü ü
• Delivery of enhanced public transport connection that
opens up employment opportunities  
11. To attract mobile
and private sector
investment both from
abroad and from
indigenous companies.
• New employment and training outcomes   15
• Demonstrate attractiveness of Scotland as excellent location
for life sciences manufacturing
 
• Increased investment confidence  
12. To create a
sustainable, high quality
business location and
R&D cluster, capable of
meeting and keeping
pace with the changing
demands of high value
manufacturing sectors
and complementing
national initiatives
including NMIS 
• Enhancement and maintenance of attractiveness of
Ayrshire as a location, meeting modern business needs
and promoting Industry 4.0 services. 
ü ü 15
• Large, visible and modern development that clearly
shows Ayrshire is Open for Business 
ü
• Recognised as part of a national strategy for improving
digital technology   
Economic Modelling Conclusion – Delivery of Phase 2
In conclusion, Option 2, the delivery of a Single Unit provides the greatest economic
benefits.  
Beyond the economic metrics, this approach delivers transformative benefits such as the
wider infrastructure provided for the site, the opportunity for training placements and
engagement with local schools e.g. through the STEM curriculum and towards the
completion of a cluster of modern industrial space within a central are of i3. 
445

Page 446

NAC Growth and Investment 
AGD Business Case 
104
APPENDIX E: RISK REGISTER 
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
I3FL-R01
(IP)
SCOPE
Outputs &
Outcomes 
Anticipated outputs and outcomes
are not delivered.
3 3 9 Ensure BC addresses sensitivity of outcomes 
Clear Evaluation & Monitoring Framework 
Maximise outcomes through project suppliers
NAC /
Contractor 
Amber 
I3FL-R02 QUALITY 
Outputs &
Outcomes 
The project fails to achieve more
inclusive growth and/or reduce
poverty by increasing the income of
people in deprived areas or
protected characteristic groups
3 5 15 Benefits Realisation Plan prepared to identify
targets. 
NAC  Red
I3FL-R03 SCHEDULE 
Timescales /
Programme 
Delays to overall project
programme and key milestones
3 3 9 Prepare a detailed project programme with
considered time allowances and review
regularly.  
Delivery
Team 
Amber 
I3FL-R04
(IP)
SCHEDULE 
Timescales /
Procure-
ment 
Delays to the submission or
approval of business cases or the
progress of tender procurement,
causes delays to the award of
contracts for flex space and the
progress or claiming AGD spend or
the Local Regeneration Fund.
4 3 12 Seek early agreement on appropriate
procurement routes 
Include anticipated tender packages within
the Council’s Procurement Wave Plan 
Spend aligned against related funding source
deadlines 
Ensure sufficient timeline allocated to
evaluation tender
Ensure response, evaluation and governance
process programme to enable swift progress
to award
NAC  Amber 
I3FL-R05 Timescales /
Environmen
t
Delays caused by environmental
considerations
3 5 15 Protected Species/Habitat risk has been
assessed at an early stage. 
Review of site studies required at key stages. 
NAC  Red
446

Page 447

NAC Growth and Investment 
AGD Business Case 
105
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
Ensure seasonal work/study requirements are
accounted for in programme.  
I3FL-R06 Timescales /
Environ-
ment 
Delays caused by site investigation
work and findings
3 5 15 Instruct SI work at early stage of project    NAC  Red
I3FL-R07 Timescales /
Regulatory 
Delays caused by objections 2 4 8 Advance programme of local & stakeholder
engagement.  
NAC  Amber 
I3FL-R08
(IP)
SCHEDULE
Timescales /
Regulatory  
Delays caused by statutory consent
processes
3 2 6 Zoned & allocated site 
Pre-App discussion with NAC Planning Assess
protected species/habitat risk at early stage
Review planning challenge/appeals
Agree programme for consents 
Advance programme of local stakeholder
engagement  
NAC  Amber 
I3FL-R9
(IP)
SCHEDULE
Timescales /
Regulatory 
Delays caused by land assembly /
lease agreement processes.
2 2 4 Early engagement with owners. 
Ensure programme allows for third party
approvals.
Phase 3 layout has been developed to reduce
requirement for private land.   
NAC / SE  Amber 
I3FL-R10
(IP)
SCHEDULE
Timescale /
Contractor
Delays during project construction
phases.
3 3 9 Regular monitoring through site meetings and
reports 
Ensure emphasis through programme analysis
and approach included in tender
documentation and evaluation.
Contractor Amber
I3FL-R11
(IP)
INTERNAL
RESOURCES
Timescale /
Staff resources not sufficient to
manage projects as they develop.
3 2 6 Risk has reduced as vacant post has been
filled, although impact has been significant on
pushing out delivery timelines for projects.  
NAC /
Consultant
s /
Contractor 
Amber 
447

Page 448

NAC Growth and Investment 
AGD Business Case 
106
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
Business /
Professional
I3FL-R12 Regulatory  Planning/building warrants are not
granted.
2 5 10 LDP supports development of site for this use.
Ensure local members briefed/updated on
project. 
Hold pre-app discussion with NAC Planning
Assess Protected Species/Habitat risk 
Formally agree programme for consents 
Advance programme of stakeholder
engagement  
NAC  Amber 
I3FL-R13
(IP)
Regulatory  Compliance Subsidy regulations. 1 2 3 Regular monitoring and if required, contact
with Subsidy Unit to ensure no specific risks
arising related to subsidy, due to nature of
the project.  
NAC Green
I3FL-R14 Financial  Design and technical studies result
in additional costs beyond the
contingencies and optimism bias
allowed for. 
3 4 12 Develop and validate project briefs and
specifications for each phase
Benchmark costs. 
Ensure early infrastructure cost tested and
informed by SI work. 
Provide Optimism Bias allowances compliant
with Green Book
Provide for contingency & inflation.  
NAC /
Design
Team 
Amber 
I3FL-R15 Financial  Slippage / delay in the programme
incurs additional costs.
3 5 15 Instruct appointed project team to address
this within Risk Register. 
Selected procurement route will seek to
ensure contract type has less risk for client.  
NAC /
Contractor
Red
448

Page 449

NAC Growth and Investment 
AGD Business Case 
107
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
I3FL-R16  Financial  There are unforeseen project
complexities that require additional
funding.
2 4 8 Provide for contingency 
Provide Green Book compliant Optimism Bias
allowances. 
Similar project has been delivered previously.  
NAC  Amber
I3FL-R17  Financial  Rental income lower than forecast 2 3 6 Market review and comparator analysis to
identify appropriate rent but ultimately down
to actual market demand on completion.
NAC  Amber
I3FL-R18 Financial  Lack of budget to support
interested tenants to fit out shell of
building
4 3 12 Identify at an early stage and with Business
Growth Team, how this can be supported.   
NAC  Amber
I3FL-R19 Financial  Lack of budget to support
maintenance of buildings until
tenants take occupancy, if buildings
are classified and non -operational.
2 2 4 Identify at an early stage with Finance and
Estates, how this can be supported.   
NAC  Amber
I3FL-R20 Professional  Lack of project management
experience.
2 3 6 Ensure experience project management team,
both in-house and any external support. 
Budget allows for appointment of required
expertise.  
NAC  Amber
I3FL-R21 Professional  Poor change management
procedures.
2 3 6 Clear and agreed procedures set in place for
internal change management and for external
processes with design team and contractor.  
NAC /
Contractor
Amber
I3FL-R22 Professional  Specification – design issues on-site 2 4 8 Adopt best practice design and ensure
flexibility for subsequent division/ alteration
of premises.  
NAC /
Consult-
ants /
Contractor 
Amber 
449

Page 450

NAC Growth and Investment 
AGD Business Case 
108
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
I3FL-R23 Contractual
/ Political 
Failure to deliver community
benefits – training, employment
3 4 12 Incorporate appropriate community benefits
into contract terms and resource
appropriately
NAC /
Contractor 
Amber 
I3FL-R24 Contractual  Issues with co-ordination on-site -
contracts, visitors
2 4 8 Ensure main contractor has appropriate
procedures for site management
Contractor Amber 
I3FL-R25
(IP)
QUALITY 
Reputat-
ional /
Political 
The Flexible Space Programme’s Full
Business Cases fail.
3 2 6 Development of OBC/FBC in accordance with
Green Book
Flex Space OBC approved June 21
Flex Space Ph1 FBC approved Dec 22
Review capex and opex costs 
Partner/stakeholder risk assessment 
Early market input / partner & commercial
input
Review governance arrangements.
NAC  Amber 
I3FL-R26
(IP)
QUALITY 
Reputat-
ional 
Demand for the Flex Space
Programme diminishes and there is
no interest from occupiers.
3 2 6 Flexible design to maximise potential interest
from occupiers. 
Marketing and promotion of floorspace
Continue to establish relationships with
national sectors (incl NMIS) 
Interest in Phase 1 has confirmed market
interest and reduced risk
Review of Ph2&3 prepared by property
agents.
NAC  Amber
I3FL-R27 Reputat-
ional 
Market expectations are not met. 2 5 10 Scale/ quality/ design based on identified
market needs
Recent research has established demand. 
Continue to review demand and business
needs with Partners including SE and SDI.
NAC  Amber 
450

Page 451

NAC Growth and Investment 
AGD Business Case 
109
AYRSHIRE GROWTH DEAL RISK REGISTER:   i3 ADVANCED MANUFACTURING SPACE 
Full Business Case, Phase 2, 08 April 2026       
(IP) denotes risks within Implementation Plan 
Risk
Code 
Risk Type Risk Description  Likeli-
hood
Impact Risk
Score
Internal Controls / Counter Measure Owner Status
Involve relevant business engagement
partners.
I3FL-R28 Reputat
ional 
Businesses interested in units
decide not to progress
3 5 15 Ensure ongoing engagement with businesses
to prepare suitable Heads of Terms. 
NAC  Red 
I3FL-R29
(IP)
EXTERNAL Project delays due to external
economic impacts such as COVID-19
and recovery.
4 2 8 Early analysis has identified that the need for
this project is unlikely to be diminished and in
fact may be even greater. 
Analysis of external factors will be monitored
that area likely to impact on the project.
NAC  Amber 
I3FL-R30
(IP)
EXTERNAL Proposals become unaffordable and
there are cost overruns.
4 3 12 Regular review of design vs budget, value
engineering and impact of market conditions
on costs
Benchmark costs
Ensure early infrastructure cost tested
/informed SI
Provide for contingency and Green Book
compliant optimism bias allowances 
Ensure project approval processes are in place
to control budget compliance
Pursue additional funding sources.  
NAC  Amber 
I3FL – R31
(IP)
Timescales /
Financial 
Existing and proposed utilities cause
issues or delays e.g. surface water
drainage connections, sub-station
requirements.
3 3 9 Ensure exact locations of existing
infrastructure identified
Early engagement with SPEN, Scottish Water,
BT etc. 
Testing to be carried out and capacity to be
confirmed for water supply 
Amber 
451

Page 452

NAC Growth and Investment 
AGD Business Case 
110
APPENDIX F: INCLUSIVE GROWTH & COMMUNITY WEALTH BUILDING 
I3 Flexible Advanced Manufacturing Space: Inclusive Growth and Community Wealth Building 
Inclusive Growth
Ambition/Objective  How?  IG Barrier IG Action Plan  CWB pillar CWB theme Equalities/
Excluded Group
Increase in GVA
across region
Deliver modern, flexible business
space to provide space to market
(65,000 sq ft)
Intermediate &
Advanced Skills, 
Structure of
economy,
Advanced digital
skills, 
Business premises
Inward investment
Maximising benefits for
Ayrshire’s business base.
Maximising benefits for
people – Fair Work.
Maximising benefits for
places/communities. 
Fair
employment 
Land and assets
Promote our
investment
opportunities to
regional and national
institutions to gain
investment in our
communities 
Expenditure in R&D
per head 
Deliver modern business space
which attracts investment from firms
spending in R&D
Structure of economy 
Advanced digital skills 
Business premises
Maximising benefits for
Ayrshire’s business base.
Maximising benefits for
people – Fair Work.
Maximising benefits for
places/communities. 
Fair
employment 
Land and assets
Promote our
investment
opportunities to
regional and national
institutions to gain
investment in our
communities 
Employment
Opportunities 
Create employment opportunities
for groups that most need them eg
disadvantaged groups and protected
characteristic groups including
women and young people. Detail
requirements through Community
Benefits in procurement packages. 
Work with partner organisations to
facilitate recruitment of excluded
groups. 
Intermediate &
Advanced Skills, 
Structure of
economy, 
Maximising benefits for
people – Fair Work.
Maximising benefits for
places/communities. 
Fair
employment 
Procurement 
Promote our
investment
opportunities to
regional and national
institutions to gain
investment in our
communities 
Improving skills 
Creating pre-employment learning
pathways for identified priority
groups eg females, living in Ayrshire. 
Support skills needs of businesses
taking space within i3. 
Intermediate &
Advanced Skills, 
Structure of
economy,
Advanced digital
skills, 
Maximising benefits for
people – Fair Work.
Maximising benefits for
places/communities.
Fair
employment 
supporting in work
progression, and
training and skills
pipeline 
452

Page 453

NAC Growth and Investment 
AGD Business Case 
111
APPENDIX G: COMMUNITY BENEFIT STATEMENT 
AGD Business Cases – Regional Community Benefits Statement 
Community Benefits 
Community Benefits have been a key component of public procurement policy and practice in
Scotland for more than ten years.   
To embed best practice and drive public bodies to consider Community Benefits clauses in
procurement, The Procurement Reform (Scotland) Act 2014 established a national legislative
framework for sustainable public procurement that supports Scotland’s economic growth through
improved procurement practice.   
The Reform Act requires public bodies, including Ayrshire Growth Deal (AGD) Partners, to consider
how their procurement activity can improve the economic, social and environmental wellbeing of
their communities. 
Community Benefits are one of a range of social and environmental requirements that can be included
in public contracts, contributing to national outcomes on sustainability including, but not limited to,
employment, learning, skills, supply chain development and community engagement. 
Contractors, suppliers and Service Providers appointed through AGD projects must demonstrate their
organisations’ commitment to providing Community Benefits within Ayrshire, over and above their
obligations to deliver on the core purpose of a contract. 
In accordance with guidance of the Reform Act and always in a relevant and proportionate manner,
applicable appointments, through AGD projects, which require procurement activity, will be subject
to Community Benefits requirements. 
Community Benefits Themes 
Through their separate procurement activities and where possible, AGD Partners are committed to
assisting both young and unemployed people by encouraging access to quality sustainable
employment and providing skills and training opportunities.  Organisations appointed to AGD projects
must therefore be able to demonstrate their commitment to integrate trainees and long-term
unemployed persons into the labour market, without distinction to sex, marital status, race, ethnic
origin or political or religious beliefs. 
AGD projects will also bring together an extensive range of experienced Professionals who, with
minimal sacrifice of time, could provide useful learning and knowledge exchange opportunities for
various groups of people in our Ayrshire communities and over a wide range of subject areas and
453

Page 454

NAC Growth and Investment 
AGD Business Case 
112
expertise. Organisations appointed to AGD projects must therefore be able to demonstrate their
commitment in providing learning opportunities across the wider Ayrshire community. 
Community Benefits pledges from AGD projects should also have a focus on supporting and
developing Ayrshire’s existing business base and building on this with the aim of increasing the
number of new business start-ups and growing sustainable businesses.  The long-term sustainable
development of Ayrshire’s SME business base is vital and AGD Partners recognise the need to support
the development of the SME sector through the use of a procurement approach which maximises SME
exposure to procurement opportunities. 
As such and through the procurement phases of any AGD project, contracting organisations will be
asked to consider the following objectives when committing to the delivery of Community Benefits: 
• Improving Education and Skills.  For example, creation of apprenticeships or delivering
knowledge exchange and presentations in schools or community groups.
• Improving Local Employability. For example, creation of new jobs, recruitment of the long-
term unemployed, disadvantaged or young people. 
• Work Experience Placements/Programmes.  For example, providing work experience
placements to those in education.
• Delivering Training and Development in the Community.  For example, mentoring - private
sector suppliers can offer support, normally as part of their CSR activity, where they can offer
training and guidance to local organisations and individuals.
• Community Consultation - giving the local community an opportunity to express an opinion
and possibly influence the design and delivery of a project or service in an area.
• Enhancing & Improving Local Community and Environmental Projects.  For example, providing
volunteers or donations to local initiatives.
• Sponsorship and Charity Work
• Supply Chain, Supported Business, Third Sector and Voluntary Initiatives.  For example,
offering Small and Medium Enterprises and Voluntary Sector organisations opportunities to
provide goods, works and/or services as part of a contract. 
Tracking & Reporting Community Benefits 
Organisations who are successful in being awarded a contract through an AGD project will have their
Community Benefits pledges evaluated on an ongoing basis, throughout the duration of their contract
and through each of the AGD Partners’ contract management procedures, using a shared Community
Benefits tracking system. 
Along with providing an excellent, flexible and accessible record of business information for those
organisations appointed to Growth Deal projects, the AGD Partners’ shared, online Community
Benefits Tracker will ensure a consistent approach is applied to the monitoring of Community Benefits
pledged through AGD procurement. 
454

Page 455

NAC Growth and Investment 
AGD Business Case 
113
APPENDIX H: EQUALITY IMPACT ASSESSMENT 
Ayrshire Growth Deal
Equality Impact Assessment including Fairer Scotland Duty 
Equality Impact Assessment is a legal requirement under the Public Sector Duty to promote equality of the Equality Act 2010. Separate
guidance has been developed on the Equality Impact Assessment’s which will guide you through the process and is available to view here:
https://www.equalityhumanrights.com/en/publication-download/assessing-impact-and-public-sector-equality-duty-guide-public-authorities/ 
The Fairer Scotland Duty (‘the Duty’), Part 1 of the Equality Act 2010, came into force in Scotland from 1 April 2018. It places a legal
responsibility on Councils to actively consider (‘pay due regard to’) how we can reduce inequalities of outcome caused by socio-economic
disadvantage, when making strategic decisions. Interim Guidance for Public Bodies in respect of the Duty was published by the Scottish
Government in March 2018.
Please note that the term ‘project’ is used throughout and applies to policies, strategies, provisions, criteria, functions, practices, budget savings
and activities, including the delivery of services. 
If you require assistance please contact: 
North Ayrshire Council Andrew Hale  andrewhale@north-ayrshire.gov.uk 
Section One: Project Details* 
Name of Project I3 Flexible Advanced Manufacturing Space 
Lead Officer (Name/Position)  Marnie Ritchie, Manager, Growth and Investment 
Support Team (Names/Positions)
including Critical Friend
Growth and Investment Team, North Ayrshire Council 
What are the main aims of the
project?
To deliver approximately 6,000m2 of advanced manufacturing space at i3 over a number of phases, to meet
market demand in an area of market failure and to complement AGD investment in the Digital Process
Manufacturing Centre (DPMC) at i3, in partnership with NMIS and CPI - creating an overall cluster of research,
innovation, accommodation and services for industry and business.  
What are the intended outcomes
of the project
The intended outcomes of the project are the delivery of much needed modern business space, new jobs and
construction jobs, supported SMEs, additional GVA, access to related employability and skills programmes for
local people and removal of sites from the vacant and derelict land register.  
455

Page 456

NAC Growth and Investment 
AGD Business Case 
114 
Section Two: What are the Likely Impacts of the Project? 
Will the project impact upon all three Ayrshire Council
areas or a specific council area and/or particular groups
within the population (please specify the equality groups)
The project has the potential to impact on all three Ayrshire Council areas but mostly
North Ayrshire. It has the potential to positively impact on particular groups in terms of
opportunities for employment and training for disadvantaged people or people within
Protected Characteristic groups. 
Consider the ‘Three Key Needs’ of the Equality Duty 
Which aspects of the project eliminate unlawful discrimination, harassment and victimisation?
Which aspects of the project advance equality of opportunity between people who share a relevant protected characteristic and
those who do not?
The project is about creating new business space, therefore due to the nature of the project, it is not considered that this key need is relevant to the
project. However, the modern design of the buildings and the site will take account of people that have disabilities in a way that existing ageing
business space may not. 
• The design of the project space will be modern and fully accessible, complying with EA 2010 standards and enabling potential employees or
trainees that are mobility impaired or disabled to access the buildings and the surrounding space. 
• The procurement process for the buildings will require construction companies to provide opportunities for trainees and job seekers from
disadvantaged or Protected Characteristic groups. For Phase 1 of the project, contractor Muir Group worked with CEIS Ayrshire to support a
young person from the local area who had been unemployed for approximately 6 months, moving from a work experience placement to a
full-time site labourer for the duration of the contract. 
• Businesses that occupy the space will be encouraged by the Council and its partners to create employment/skills development/ learning
opportunities for people in disadvantaged or Protected Characteristic groups. Phase 1 has only recently been let so and update can be
provided in due course.  
• It is intended that the project will seek to improve active travel links to the site, to make the location more accessible to people without
access to a car and who may be reliant on affordable and accessible public transport services. Active travel route improvements have
recently been made in close proximity to the i3 AGD investment site along Long Drive, linking to Riverside Way, providing wider shared
surface footways and crossing points towards key public transport routes. 
456

Page 457

NAC Growth and Investment 
AGD Business Case 
115
Which aspect of the project foster good relations between people who share a protected characteristic and those who do not? (Does
it tackle prejudice and promote a better understanding of equality issues?) 
Have any cross-cutting impacts been identified from other Council Services or Partner Agencies? (Multiple discrimination or
accumulated effects of multiple proposals on a protected characteristic group) 
Island Proofing  
Island Proofing is about considering the particular needs and circumstances of island communities when public sector organisations exercise
their functions and make decisions.  This process includes a range of issues such as access to services, digital connectivity, employment and
access to education; transport and access to goods and services. 
The project is focussed on a specific location at i3 Business Park in Irvine. It is not considered that the particular needs and circumstances of island
communities would be detrimentally affected by this particular project. 
Considering the following Protected Characteristics and themes, what likely impacts or issues does the project have for the group or
community?   
Please outline evidence in relation to impacts identified. List any likely positive and/or negative impacts. If negative impacts are
identified, can these be mitigated or lessened? 
If you require further information in relation to evidence, the Equality Evidence Finder brings together the latest statistics and research
for Scotland across different themes for age, disability, ethnicity, gender, religion, sexual orientation, socio-economic status and
transgender status. 
The Equality Evidence Finder is updated monthly with a summary of the key official statistics, social research and National
Performance Framework equality analysis. Links to further datasets, statistics and research are provided to help find the full range of
available equality evidence for Scotland.
The design of the buildings and job/skills/training opportunities for protected characteristic groups will help tackle prejudice and promote a better
understanding of equality issues, through the integration of these requirements as standard practice. 
No cross-cutting impacts have been identified at this stage. 
457

Page 458

NAC Growth and Investment 
AGD Business Case 
116
Protected Characteristics Evidence Positive/Negative
Impacts
Mitigating
Factors
Age:  Issues relating to different age groups
eg older people or children and young people
Young people are particularly
excluded from manufacturing growth
areas.  
Opportunities through NAC’s
Employability team to sign post
people seeking employment to
contract opportunities.   
Disability: Issues relating to disabled people  Limited access to employment
opportunities due to limited scope to
work in ageing industrial buildings and
limited access to transport to i3. 
Modern design standards will
ensure this is no longer an
issue. 
Gender Reassignment –
Trans/Transgender: Issues relating to
people who have proposed, started or
completed a process to change his or her sex
No issues identified.   
Marriage and Civil Partnership:
Issues relating to people who are married or
are in a civil partnership
No issues identified.   
Pregnancy and Maternity: Issues relating to
woman who are pregnant and/or on maternity
leave
No issues identified. 
Race: Issues relating to people from different
racial groups,(BME) ethnic minorities,
including Gypsy/Travellers
No issues identified.  
Religion or Belief: Issues relating to a
person’s religion or belief (including non-
belief)
No issues identified.  
Sex: Gender identity: Issues specific to
women and men/or girls and boys 
Women are particularly excluded from
manufacturing growth areas.
Opportunities through STEM
Engagement with local schools
to encourage more girls to
consider certain careers. 
Sexual Orientation: Issues relating to a
person’s sexual orientation i.e. LGBT+,
lesbian, gay, bi-sexual, heterosexual/straight
No issues identified.  
Children’s Rights Issues and impacts
affecting children’s rights*
No issues identified.  
458

Page 459

NAC Growth and Investment 
AGD Business Case 
117
Protected Characteristics Evidence Positive/Negative
Impacts
Mitigating
Factors
*for more information please email – 
andrewhale@north-ayrshire.gov.uk
Health
Issues and impacts affecting people’s health
No issues identified. Wider improvements to active
travel infrastructure enabling
people to walk/cycle/wheel to i3. 
Human Rights: Issues and impacts affecting
people’s human rights such as being treated
with dignity and respect, the right to
education, the right to respect for private and
family life, and the right to free elections.
No issues identified.   
Fairer Scotland Duty – Socio Economic Disadvantage 
Evidence Positive/Negative Impacts Mitigating Factors
Low Income/Income Poverty:
Issues: cannot afford to maintain
regular payments such as bills,
food and clothing. 
No relevant issues identified.  
Low and/or no wealth: Issues:
enough money to meet basic
living costs and pay bills but
have no savings to deal with any
unexpected spends and no
provision for the future 
No relevant issues identified.  
Material Deprivation: Issues:
being unable to access basic
goods and services i.e. financial
No relevant issues identified.   
459

Page 460

NAC Growth and Investment 
AGD Business Case 
118 
Section Three: Evidence Used in Developing the Project 
Involvement and Consultation
In assessing the impact(s) set out above what evidence
has been collected from involvement, engagement or
consultation?
Who did you involve, when and how? 
Data and Research
In assessing the impact set out above what evidence
has been collected from research or other data.  Please
specify what research was carried out or data collected,
when and how this was done. 
Research by Ryden property consultants on demand for commercial space
across Ayrshire and within North Ayrshire. 
Advice from Graham and Sibbald property agents.  
Inward investment inquiries related to available industrial / commercial space or
land to build space, including referrals from Scottish Enterprise. 
Inquiries from local companies seeking to move in order to expand their business
premises.   
Partners data and research Please see above 
products like life insurance,
repair/replace broken electrical
goods, warm home,
leisure/hobbies 
Area Deprivation: Issues:
where you live (rural areas),
where you work (accessibility of
transport) 
Accessibility and affordability of
transport to i3. 
Access to I3 Enterprise Area is
currently limited by public
transport. 
Active travel improvements
(walking/cycling/wheeling) made
from i3 AGD investment site to
public transport routes. 
Action to progress discussions
with public transport provider
to consider improved services. 
Outcome of discussions with
public transport provider
required that improved public
transport to i3 would require
subsidy until there was a level
of demand for the service.
This will be reviewed once the
i3 Flexible Space buildings are
occupied.  
460

Page 461

NAC Growth and Investment 
AGD Business Case 
119
In assessing the impact(s) set out in Section 2 what
evidence has been provided by partners?
Please specify partners 
Gaps and Uncertainties
Have you identified any gaps or uncertainties in your
understanding of the issues or impacts that need to be
explored further? 
No 
Section Four: Detailed Action Plan to address identified gaps in:
a) evidence and 
b) to mitigate negative impacts 
Note: Please add more rows as required. 
Section Five - Performance monitoring and reporting
Considering the project as a whole, including its equality and diversity implications:
No. Action  Responsible Officer(s)  Timescale
1 Ensure the proposed build space and general project location is fully
accessible and where appropriate, compliant with EA2010. 
Project Designers  Over the course of
the various phases
of the project. 
2 Progress discussions with public transport provider 
Discussions have taken place which require that there must be sufficient
demand for an improved bus service, otherwise the route will require to be
subsidised. It is too early in the project for there to be further demand as
the Phase 1 building is not yet occupied.  
AGD Project Lead  December 2022
Review position by
December 2026
3 Develop initiatives with colleagues and other Council teams to ensure
young people and women will benefit from the project.
For Phase 1, Muir Group employed a young unemployed person and made
links with Auchenharvie Academy for STEM engagement activities. 
AGD Project Lead  Over the course of
the various phases
of the project.
When is the project intended to come into effect? The project has started and will be delivered in a series of phases. 
When will the project be reviewed? At various Gateway Stages and at each Phase.
Which Panel will have oversight of the project? The Project Board and particular Gateway Review meetings. 
NAC’s Executive Leadership Team. 
461

Page 462

NAC Growth and Investment 
AGD Business Case 
120 
Section 6 
Ayrshire Growth Deal   
Summary Equality Impact Assessment Implications & Mitigating Actions 
Name of Project:  i3 Flexible Advanced Manufacturing Space project 
Name of Project Lead: Marnie Ritchie 
Email of Project Lead: marnieritchie@north-ayrshire.gov.uk 
Date of Assessment: original assessment for OBC in Feb 2021, reviewed 07 April 2026 
This project will assist or inhibit the Council’s ability to eliminate discrimination; advance equality of opportunity; and foster good relations as
follows: 
Please see information contained above. 
1. Summary of project aims
2. Summary of how the project will eliminate discrimination
3. Summary of how the project will advance equality of opportunity
4. Summary of how the project will foster good relations
5. Summary of how the project considers Socio-Economic Disadvantage (Fairer Scotland Duty)
6. Summary of how the project considers the needs of island communities
7. Summary of Key Action to Mitigate Negative Impacts
a. Actions and Timescales 
Project Lead:  Marnie Ritchie, Manager, Growth and Investment
Signed:   07 April 2026 
462

Page 463

NAC Growth and Investment 
AGD Business Case 
121
APPENDIX I:  CARBON ANALYSIS 
Item  Project Owner Response
1. Project Name  i3 Flexible Advanced Manufacturing Space 
2. Deal Region  Ayrshire 
3. Brief Description of Project  The provision of flexible advanced manufacturing space
to support business growth and inward investment.  
4. Expected Carbon Emissions
Impact CONTROL Category (1-5)
3 – Cap + then Zero
5. Expected Carbon Emissions
Impact INFLUENCE Category (A-C)
B (i.e. will have a negligible effect on wider carbon
emissions) 
6. Justification of Expected Carbon
Emissions Impact Category e.g. a
short narrative outlining the key
carbon emission sources and their
relationship to capital and
operational net zero following the
Deals Carbon Emissions Impact
Categorisation Process.
Carbon emissions through the construction process to
create new industrial buildings and related access
roads, parking, yard space and sustainable urban
drainage areas. The first phase and phase two have
considered measures at the operational stage to
reduce carbon through the installation of solar roof
panels, EV charging points and suds ponds. 
7. Could the Carbon Emissions
Impact Category be improved?
e.g. from Category 4B to Category
3A
It is expected that 3B will be the highest achievable
rating for the project. 
8. Could the carbon performance of
the project be improved? e.g.
reducing emissions further,
achieving net zero faster.
Yes. The project is being delivered in phases and its
anticipated that further knowledge will be gained as
the project develops, to inform adjustments or
improvements to the design. 
9. How will carbon be managed? e.g.
through PAS 2080: Carbon
Management in Infrastructure for
infrastructure projects or the RICS
Whole Life-Cycle Carbon
Professional Statement for
buildings projects
PAS 2080 – check 
10. What other carbon savings are
expected to result from the
project? e.g. wider carbon savings
across the economy resulting from
project output
The new industrial space created through the project
will provide businesses with the opportunity to benefit
from solar panels and electric charging for vehicles on
each site. The wider site will have a network of suds
ponds and links into a separately funded active travel
network of improvements which provides more
sustainable transport options for travelling to and from
the project site. 
There is also the possibility that future tenants could be
involved in activities that contribute to achieving net
zero. 
463

Page 464

NAC Growth and Investment 
AGD Business Case 
122 
APPENDIX J: AYRSHIRE GROWTH DEAL CHANGE
MANAGEMENT PROCESS 
464

Page 465

NORTH AYRSHIRE COUNCIL
02 June 2026
Cabinet
Title: National Islands Plan and North Ayrshire Islands
Programme Update
Purpose: To provide a progress update on the North Ayrshire Islands
Programme and the new National Islands Plan and to outline
proposed next steps.
Recommendation: That Cabinet:
a) Notes the progress of the North Ayrshire Islands Programme
and achievements to date;
b) Notes the publication of the National Islands Plan 2026 to
2031 and associated investment in 2026/27;
c) Agrees to the refresh and refinement of the current Local
Island Plans and associated delivery plans and their intended
reporting; and
d) Agrees to the finalisation and submission of the proposed
funding applications to the Scottish Government’s Islands
Programme.
1. Executive Summary
1.1 Established in 2021 to deliver the National Islands Plan objectives locally, the North
Ayrshire Islands Programme has evolved into a mainstreamed approach driving
economic, social, environmental and wider community improvements for Arran and
Cumbrae.
1.2 Programme activity to date includes supporting the co-development and delivery of
Local Island Plans, assisting the Council in securing over £6.6 million for island-
specific projects, launching the Wee Grants for Islands pilot and contributing to
regional strategies and national policy initiatives.
1.3 The new five-year National Islands Plan was launched on 24 February 2026 and is
supported by a £5.75 million package of investment for island communities to create
jobs, strengthen local economies, improve infrastructure, enhance community
resilience and support the transition to net zero.
Agenda Item 20
465

Page 466

1.4 Informed by this and the progress made to date through the North Ayrshire Islands
Programme, it is proposed that a refresh and refinement of the Local Islands Plan be
undertaken in partnership with communities and stakeholders. The refreshed plans
will reflect the progress to date, incorporate up-to-date socio-economic data, align with
the new National Islands Plan, Council Plan and wider local, national and regional
priorities. 
2. Background 
2.1 The first National Islands Plan (NIP), under the Islands (Scotland) Act 2018, was
published in December 2019. This provided a framework and thirteen strategic
objectives aimed at improving outcomes for island communities and formed the
foundation for local delivery approaches. 
2.2 The Plan enabled new ways of working across local and national government,
Highlands and Islands Enterprise (HIE), community planning partners, island
communities and businesses. This promoted improved collaboration and knowledge
sharing across island areas. 
2.3 In February 2021, with financial support from Scottish Government, HIE and North
Ayrshire Council, the North Ayrshire Islands Recovery and Renewal pilot was
established. This included the recruitment of a dedicated Senior Officer (Islands) role
to lead delivery and strengthen island policy development. The role works across the
public sector, island communities and external stakeholders to target long-standing
island challenges. 
2.4 The pilot initially ran for three years between 2021 and 2024. Reflecting the
progressive tripartite commitment, strengthening collaboration and North Ayrshire
Council’s reinforced input and increasing impact on island policy and practice, the pilot
was mainstreamed in February 2024 and rebranded as the North Ayrshire Islands
Programme. The Programme continues to be supported financially by the Scottish
Government and HIE are anticipated to confirm their ongoing commitment in the near
future. 
National Islands Plan 2026 to 2030 
2.5 The new five-year National Island Plan was formally launched on 23 February 2026.
The Plan establishes population retention and attraction as its overarching objective
with seven strategic objectives and associated targeted commitments contributing,
directly or indirectly, to this overarching aim by supporting the conditions that enable
people to live, work and remain in island communities. Community Wealth Building
(CWB) is the key approach guiding the implementation of the Plan, which has a
strengthened emphasis on locally led solutions and flexible delivery. 
2.6  The Plan focuses on seven strategic objectives. It is supported by a national
Implementation Route Map that sets out all commitments, identifies the organisations
responsible for delivery and provides clear timescales. This gives island communities
a transparent view of national activity and when key actions will take place 
• Connectivity – Improve transport and digital links
• Housing – Increase affordable, suitable homes
466

Page 467

• Health & Social Care – Enhance local and digital services
• Economy, Education & Skills – Support sustainable growth and local learning
• Climate, Nature & Energy – Accelerate net zero transition with community
benefits
• Poverty & Social Justice – Tackle cost-of-living, fuel poverty, and inequality
• Empowered Communities & Culture – Strengthen local leadership, heritage and
languages. 
2.7 Delivery of the Plan will be supported by an enhanced evidence framework. The
Scottish Islands Data Dashboard will be updated to reflect the new Plan and will
monitor real time changes in key areas such as population, economic performance,
housing, transport and the cost of living. A new Scottish Islands Survey will provide
direct insight from communities, helping to build a stronger understanding of local
conditions and emerging trends. 
2.8 Within three years, a comprehensive outcomes framework will be developed to
guide decision-making at both national and local levels. This will support improved
targeting of investment, ensure national resources are aligned with local needs and
provide additional support for islands facing the greatest demographic pressures. It
will also make clearer how national decisions impact local priorities. 
2.9 Following publication of each annual report, the Government will hold public
engagement sessions, including island-based events and an annual Islands
Conversation webinar. These sessions will give island communities the opportunity
to review progress, raise issues and influence next steps. 
2.10 The Plan is supported by £5.75 million investment in 2026/27 for island communities
to create jobs, strengthen local economies, improve infrastructure, enhance
community resilience and support the transition to net zero. The funding also aims to
address key pressures such as depopulation and rising fuel costs, which
disproportionately affect island areas. This is comprised of the: 
• £3 million Islands Programme to support essential island infrastructure projects.
Examples of previous projects include Garrison House, Cumbrae and Dyemill
Bike Park, Arran.
• £1 million Islands Cost Crisis Emergency Fund to assist communities in
managing rising living costs. Funding is allocated across the six island local
authorities including North Ayrshire Council.
• £0.75 million Carbon Neutral Islands Programme to support local net zero
initiatives on the six Carbon Neutral Islands including Cumbrae.
• £1 million for projects linked to the new National Islands Plan for initiatives such
as an island scholarship pilot, mental health support for young people and
training programmes for sustainable tourism. 
2.11 Our island communities contributed extensively throughout the consultation to inform
the Plan, which includes a Case Study on the North Arran Community Benefit
Society’s Lochranza Country Inn. Officers have worked collaboratively across
Council services, with the Scottish Government’s Islands team, island communities
and wider stakeholders, providing the opportunity to offer detailed feedback on the
draft Plan throughout its development. 
467

Page 468

2.12 Officers continue to work collaboratively with our island communities, Locality
Partnerships and across Council Services on an annual basis to maximise the level
of funding secured from this investment for our islands. 
2.13 North Ayrshire Council currently receives an annual allocation from the Islands Cost
Crisis Emergency Fund including £0.058 million in 2026/27. In line with the fund’s
objectives, monies have been used in previous financial years to support crisis
grants for island residents, community-based projects which address island specific
cost of living issues, the additional costs of ensuring there is no educational loss for
children and young people living on the islands, and other relevant projects. The use
and distribution of this year’s funding will be discussed with members of the Arran
Island Plan Groups, Cumbrae groups and other appropriate internal and external
stakeholders and reported to Cabinet at an appropriate future date. 
North Ayrshire Islands Programme 
2.14 The North Ayrshire Islands Programme continues to deliver against the agreed   
objectives, to: 
• Develop and monitor Local Island Plans for Arran and Cumbrae, aligning them
with National Islands Plan objectives and Community Wealth Building principles.
• Support the recovery and renewal of the islands from the social and economic
impact of Covid-19 and reduced ferry services through maximising the support
available for island communities, including targeting partner resources to address
specific recovery priorities particularly in business resilience, supporting the
identification and preparation of bids to access external funding by working
alongside wider Council services including business development and
regeneration. 
• Contribute to closer and more coordinated working between the island
communities, community planning partners, national and local government and
agencies to ensure stronger place-based partnership working and a whole
systems approach to improve island wellbeing, including in areas such as
housing and transportation and the implementation of the National Islands Plan.
• Ensure the understanding and representation of the unique needs of islands’
communities in local and national policy development and encourage strategic
island planning at all levels. 
2.15 A wide range of activity, outputs and positive outcomes have been delivered since
inception, informed by the ten-year Local Island Plans for Arran and Cumbrae,
approved in February 2022. Achievements include securing over £6.6 million in
investments; selection as a COSLA Excellence Awards finalist; leading North
Ayrshire’s participation in the inaugural Cross Party Group on Islands Economy
Showcase; launching the Wee Grants for Islands pilot; contributing to regional
strategies; and securing funding through the Addressing Depopulation Action Plan.
These are detailed in Appendix One. 
2.16 The examples outlined demonstrate North Ayrshire Council’s continued and
dedicated commitment, through the unique Islands Programme, to a fair and
inclusive North Ayrshire, where we are working collaboratively with our island
communities, stakeholders and partners to deliver immediate and longer-term
468

Page 469

improvements to island residents’ lives, strengthening the local economy and
supporting sustainable social, economic and environmental progress and growth. 
2.17 Governance arrangements include quarterly strategic review meetings with
programme partners, quarterly Islands Heads of Service meetings and regular policy
briefings for elected members and officers involved in island networks. Arran and
North Coast Locality Partnerships receive quarterly updates on relevant island policy
work. 
2.18 The Programme is supported by the ongoing commitment and funding from the
Scottish Government and HIE. The Scottish Government has committed £89,500 in
2026/27 to the continuation of the Programme and the development of the Islands
Intelligence Hub Pilot. A further contribution is also anticipated from HIE in the near
future to the continuation of the Programme. The Intelligence Hub project seeks to: 
• Address island‑level data gaps on our islands, focusing on areas such as
housing, economic development, transport and climate resilience. 
• Create a community‑driven data dashboard that provides accessible, real‑time
insights to support local planning, decision‑making and service improvement,
which is scalable and replicable across other islands.
• Develop and deploy a community data collection toolkit - including surveys,
participatory mapping and citizen‑science approaches.
• Strengthen community‑led decision‑making by enabling island residents, groups,
businesses and public agencies to make faster, smarter decisions using
high‑quality, locally relevant data and facilitating informed dialogue between
community stakeholders and government.
• Share learning across islands and national partners through policy briefings and
learning packs.
• Develop an evaluation report with recommendations on scaling, impact,
replicability and opportunities for integration into national island data strategies. 
Local Islands Plans Refresh 
2.19 In response to the publication of the National Islands Plan 2026 to 2031 and building
on the effective and substantial work to date, it is proposed that the North Ayrshire
Islands Programme progress work with island stakeholders, Elected Members and
across Council teams to co-develop refreshed and refined Local Island Plans. These
will be aligned with our Council Plan, Community Wealth Building Strategy, the new
National Islands Plan, the Ayrshire and Highlands and Islands Regional Economic
Strategies and other relevant policies, strategies and plans. 
2.20 The refreshed and refined plans will reflect on the progress to date and align with the
new National Islands Plan and incorporate up-to-date local socio-economic data and
reflect local, regional, national and UK contexts. Consideration will be given to
developing island investment plans that can be used as a framework to identify
strategic island and priority capital and revenue projects seeking external funding,
ensuring there is a co-produced and co-defined project pipeline to maximise
investment opportunities for the islands. 
2.21 Delivery continues to support the Council Plan through investment, improved
services, strengthened local democracy, enhanced climate action and stronger
partnership working.
469

Page 470

2.22 A future report will be submitted to Cabinet for approval of the refresh and refinement
of the Local Island Plans 
Scottish Government Island Programme Applications 
2.23 The Scottish Government’s 2026/27 Islands Programme provides a competitive
capital funding opportunity to support critical infrastructure investment on inhabited
Scottish islands. The Programme supports delivery of the National Islands Plan, with
particular emphasis on population retention and attraction, and on projects that are
community‑led, place‑based and deliver long‑term resilience. 
2.24 North Ayrshire Council is eligible to submit applications as lead authority for Arran
and Cumbrae. Funding may support priorities including community facilities, housing
enablement, transport and connectivity, economic development infrastructure, net
zero investment, and initiatives that reduce the cost of living and improve wellbeing.
Projects must be capable of delivering and committing expenditure within the
2026/27 financial year. 
2.25 The deadline for submissions to Scottish Futures Trust is 8 June 2026. The
Economic Policy and Regeneration teams led a cross‑service process to identify and
develop suitable projects to ensure alignment with Council priorities, community
need, and deliverability. The following projects are proposed for submission: 
• Arran Heritage Museum Upgrade, Brodick;
• DA Hall Site Redevelopment, Garrison House, Millport;
• Island Solar Compactors Project;
• Arran Outdoor Education Resource Sustainability Improvements, Lamlash; and
• Cumbrae Path Upgrades, Millport. 
2.26 An update will be provided to Cabinet on the outcome of the applications. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the progress of the North Ayrshire Islands Programme and achievements
to date; 
b) Notes the publication of the National Islands Plan 2026 to 2031 and associated
investment in 2026/27;
c) Agrees to the refresh and refinement of the current Local Island Plans and
associated delivery plans and their intended reporting to Cabinet; and
d) Agrees to the finalisation and submission of the proposed funding applications to
the Scottish Government’s Islands Programme 
470

Page 471

4. Implications/Socio-economic Duty 
Financial 
4.1 Delivery of the Island plans will be reliant on successful external funding applications
being made to support the delivery of the Plans’ ambitions, mirroring the approach
taken with the initial Plans. The costs associated with refreshing and refining the Local
Islands Plans will be met from existing resources, including the funding awards from
Scottish Government and HIE for 2026/27. 
Human Resources 
4.2 None arising from this report. The proposal will be delivered through existing
resources which continue to be supported financially and through Officer resource by
the Scottish Government and HIE in 2026/27. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The overarching purpose of the Local Island Plans is to drive sustainable economic
development, build resilience, support population attraction and retention and
advance the Council Plan commitment to reduce inequalities, widen democratic
participation and strengthen community empowerment by encouraging greater local
involvement. The refresh of the Plans will ensure these aims can be met more fully by
aligning updated data, community priorities and national policy direction, enabling
clearer strategic focus and improved delivery outcomes for the islands. 
Climate Change and Carbon 
4.5 The refreshed Local Island Plans will continue to align to the Sustainable North
Ayrshire Strategy and seek to continue to deliver positive environmental and
sustainability outcomes through the associated action plans. 
Key Priorities 
4.6 The North Ayrshire Islands Programme and refreshed Local Island Plans will continue
to support all four of the Council Plan’s priorities and strategic aims of: 
• Wellbeing: To transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people by enabling island communities to identify local
priorities, co-design solutions and address poverty and inequality through targeted
investment and collaborative action.
• Communities and Local Democracy: We will have active, inclusive and resilient
communities by providing a clear and accessible mechanism for local democratic
participation and strengthening community influence over local decision-making.
• Climate Change: To achieve net-zero by 2030.
• A Sustainable Council: A Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources on our priorities.
471

Page 472

Community Wealth Building 
4.7 This proposal aligns directly with the principles of Community Wealth Building and the
Council’s Community Wealth Building Strategy to build a strong, fair and sustainable
local economy. This will also support the implementation of the Community Wealth
Building (Scotland) Act 2026. It will ensure that the Council maintains its commitments
as a Community Wealth Building Council by supporting the localised use of assets,
enabling community led economic activity and ensuring Council resources and
investment are focused on priorities that maximise impact for island communities. 
Islands Communities Impact Assessment (ICIA) 
4.8 None arising from this report. The proposal seeks to maintain and strengthen support
to island communities and does not introduce adverse impacts. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The North Ayrshire Islands Programme was co-produced by the Council, Scottish
Government and HIE. Consultation was undertaken with local stakeholders,
community representatives and businesses on each island including the Arran Locality
Partnership, the Arran Recovery Group and Cumbrae representatives. The Local
Island Plans were developed through extensive engagement and consultation with
island communities and island stakeholders and across Council Services, with the
Health and Social Care Partnership, Scottish Government and HIE. The refreshed
Plans will be developed through comparable extensive engagement and consultation. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Sarah Baird, Senior Officer (Islands), on
sarahbaird@north-ayrshire.gov.uk 
Background Papers
North Ayrshire Council, Cabinet Report: Islands Renewal Best Practice Pilot, 6 October
2020
North Ayrshire Council, Cabinet Report: Islands Plans, 22 February 2022
Scottish Government, National Islands Plan, 26 February 2025 
472

Page 473

Appendix One: North Ayrshire Islands Programme Achievements 2022 to 2025 
The Programme has delivered a wide range of activities, outputs and positive outcomes
since its inception. Key to the success has been the development of 10-year Local Island
Plans for Arran and Cumbrae, approved in February 2022, and the associated annual
action plans. Informed by extensive engagement and consultation, these Plans have
informed the delivery of the Programme, which has included: 
• Leading and supporting funding applications for island-specific projects, securing over
£6.6 million for investment for North Ayrshire islands.  The tables below highlight the
broad range and scale of projects and investments across the £6.6m investment in our
islands supported between 2022 and 2025. This is not an exhaustive list of projects but
aims to highlight the key projects across a range of funds. The total expenditure across
these sources is £6,643,281.85. 
• Being selected by COSLA as a finalist in the 2024 Excellence Awards in Strengthening
Communities and Local Democracy category. Only fifteen projects, from over two
hundred submissions across Scottish local government were chosen as finalists for the
Excellence Awards, which are COSLA’s annual celebration of the very best of Scottish
Local Government.
• Supporting the delivery of the inaugural Scottish Parliament Cross-Party Group on
Islands (CPIG) Economy Showcase promoting our islands economic opportunities,
challenges and opportunities and showcasing local business innovation and products. A
range of local island businesses participated in the all-day event at Holyrood in April
2025, including Auchrannie Resort, Arran Dairies and Cumbrae Community
Development Company.
• Launched the Wee Grants for Islands pilot in December 2025, enabling Arran and
Cumbrae communities to deliver Local Island Plan priorities through small-scale projects
addressing economic, social, and environmental challenges.
• Contributing to the development of the inaugural Highlands & Islands Regional
Economic Partnership (HIREP) strategy and draft delivery plan (2026 to 2028), with
ongoing officer engagement to shape implementation. HIREP works to support inclusive
and sustainable economic growth across the region by focusing on shared priorities and
coordinating efforts to tackle common challenges.
• Through the Government’s first Addressing Depopulation Action Plan (ADAP), securing
Phase 1 funding to progress exploring the feasibility for inclusive childcare models to
strengthen access to childcare provision on Arran and the Garnock Valley.
• Securing ongoing funding and commitment from the Scottish Government to support the
delivery of the pilot and North Ayrshire Islands Programme.
• Supporting £0.46 million funding being secured through the Carbon Neutral Islands
Programme. 
Scottish Government 
Project Award Project Name & Summary
Millport Flood
Protection
Scheme
£33.76M Delivery of a one in 200-year standard of protection for
2km of Millport's coastline Featuring over 950 precast
units, rock armour breakwaters, and enhanced
promenade spaces designed to protect island
properties.
473

Page 474

Millburn Flood
Protection
Scheme 
£3.064M Design and construction of a 494 metre long overflow
between the Golf Road/Kirkton Crescent junction and
West Bay and a precast concrete seawall along a
section of West Bay Road. Construction is underway
and due to complete Summer 2026.
Total £46.03M 
Scottish Government – Islands Programme 
Recipient Award Project Summary
Millport Town
Hall Trust £689,450
Millport Town Hall. 
To develop Phase 2 of a multi-funded development to
use the building’s basement to provide a central
community space, delivering a package of activities
and attractions within a heritage building.
Arran High
School
Mountain
Bike Club
£220,625
Dyemill Park
To build, manage and maintain an accessible,
inclusive and safe, all-weather environment to grow
and develop the Islands cycling community,
inspiring Arran to cycle.
Cumbrae
Community
Development
Company
£730,998
Garrison House
To deliver a comprehensive conservation scheme at
Garrison House including a new gym accessible to
all and provision of a changing places facility to
address the lack of both on the island.
North
Ayrshire
Council
£540,000
Island Pit Stops programme
Delivered through eight community groups across
Arran & Cumbrae, to upgrade and develop their
existing public toilets, into ‘visitor pit stops’ and
improving the long-term viability of assets.
Millport Town
Hall Trust £414,425
Millport Town Hall
To complete the waterproofing enabling works
within the Millport Town Hall basement.
North Ayrshire
Council £323,925
Brodick Hall Island Hub
To transform a vital and valued island community
space, bringing it into the 21st century through
critical investment in the building’s fabric.
Arran Youth
Foundation £382,299
Arran Youth Foundation Centre
To install a new, bespoke replacement youth centre
in Lamlash, on the site of Arran Youth Foundations'
current facility.
Lochranza
and Catacol
Sea Society
£129,718
Lochranza Securing a Future in Marine Tourism
To secure the future for the community brought by
marine visitors through rejuvenating and extending
critical marine infrastructure at Lochranza, Arran.
Total £3,431,440 
474

Page 475

Scottish Government - to support delivery of National Islands Plan 
Project Award Project Name & Summary
Cumbrae
Community
Development
Company
£30,000  Garrison House
To complete the conservation scheme including
essential work identified as project progressed.
Kildonan Hall &
Improvements
Committee 
£25,000 Kildonan Hall Project
To cover increased tender costs associated with
delivery on island.
Cumbrae Youth
Forum 
£30,000 Cumbrae Youth Forum Premises
To allow the group to undertake capital works and
accelerate the delivery of Child Care Inspectorate
regulation requirements.
Total £85,000 
UK Shared Prosperity Fund 
Recipient Award Project Summary
Kildonan Hall &
Improvements
Committee
£25,000 Kildonan Hall Project
To undertake preparatory works in advance
of the build for the Kildonan Community
Shop & Café.
Arran Eco Savvy
Community SCIO
£9,200 Accessible e-bikes
To support the purchase of two wheelchair e-
bikes.
North Arran
Community
Benefit Society
£49,750 Lochranza Country Inn
To support the refurbishment of the Lochranza
Country Inn as a community hub.
Kildonan Hall &
Improvements
Committee
£100,000 Kildonan Hall Project
To support the capital build of the community
shop and café in Kildonan.
Total £183,950 
Scottish Government – Regeneration Capital Grant Fund 
Recipient Award Project Summary
Millport Town Hall
Trust
£1,864,478 Regeneration of Millport Town Hall
Total £1,864,478 
Crown Estate Scotland 
Recipient Award Project Summary
Millport Town Hall
Trust
£192,952 Millport Town Hall
To support the regeneration of Millport Town
Hall.
North Ayrshire
Council
£25,000 Millport Marina Masterplan
To advance the masterplan for Millport Pier
475

Page 476

& Harbour.
North Ayrshire
Council
£50,000 North Ayrshire Islands Community Fund
To provide support for community
organisations in addressing their specific
needs, achieve their aims and priorities of
the Island Plans (approved March 2025).
Total £267,952 
Scottish Government Place Based Investment Programme 
Recipient Award Project Summary
Arran Pioneer
Project
£25,000 To support the installation of a Geodome to
enable food sustainability.
Kildonan Hall £23,700 To support the creation of a community hub
& cafe.
Arran High School
Mountain Bike Club
£20,000 To enable delivery of a new mountain bike
track and support match funding.
Millport Town Hall
Trust
£25,000 To support the purchase and installation of
Glulam Beams as part of the works
undertaken at Millport Town Hall.
Brodick Tennis £30,000 To support the renovation of park tennis
courts and provision of gate access.
Total £123,700 
North Ayrshire Council – Repurposing Property Grant Fund 
Project Applicant Award Project Summary
Whitehouse,
Lamlash
£18,486 Feasibility study to repurpose the
Whitehouse Land, Lamlash.
College of the Holy
Spirit
£23,940 Feasibility study to repurpose the land and
buildings within the Curtilage of the
Cathedral of the Isles, to support financial
viability.
Arran Youth
Foundation
£8,328 Feasibility study to identify options for a
new, modern youth centre facility behind
Arran High School.
Trust Housing £9,977 Feasibility study to explore the conversion
potential of an existing and vacant former 2-
storey office located in Lamlash.
Arran Development
Trust
£7,390 Feasibility study regarding purchase of
property to renovate for ADT office,
workshop for kit building and training along
with use of yard to store construction
equipment.
Total £68,121 
476

Page 477

Active Travel and Transport Funding 
Project Funder(s) Value
Access improvements to Cumbrae
Ferry
Improvements to queuing facilities at
Largs and developing proposals for
improved queuing facilities at
Cumbrae.
Strathclyde Partnership
for Transport
£72,967.23
Cumbrae Active Travel Study
Feasibility study to consider options
for an active travel route from
Cumbrae ferry slip to Millport.
Sustrans Community
Links, NAC, TS Active
Travel Infrastructure Tier
1 Fund
£92,705.09
Islands Connectivity Infrastructure
Works
Various cycle storage facilities and
cycle stands.
Cycling, Walking and
Safer Routes Fund
£47,192.84
Brodick to Corrie Cycle Path
Feasibility and Detailed Design
Feasibility study to consider an active
travel route from Brodick to Brodick
Castle/Glen Rosa and Corrie.
SPT Capital
Programme
Active Infrastructure Tier
1 Fund
£139,178.69
Islands Infrastructure Fund 
Electric Vehicle Charging Points and
Parking Improvements on Arran and
Cumbrae.
Islands Infrastructure
Fund
£259,000
Cycle Parking at Schools 
Providing cycle shelters at various
schools on Arran.
Cycling, Walking and
Safer Routes Fund
Active Infrastructure Tier
1 Fund
£7,597
Total £618,640.85 
Carbon Neutral Islands Funding 
Project Funder(s) Value
Millport 130 Project (Phase One)
To install roof-mounted
solar PV systems to 130 homes in
Millport in a phased approach.
Scottish Government £166,500
Millport Solar PV and Battery Project
(Phase Two)
To install solar PV and battery systems
in up to 30 homes, targeting those with
the lowest EPC ratings. 
Scottish Government £293,101
Total £459,601.00 
477

Page 478

478

Page 479

NORTH AYRSHIRE COUNCIL 
2 June 2026 
Cabinet 
Title:    Regeneration Delivery Plan Funding Proposals Update
2026/2027 
Purpose:  To provide an update on progress of the Regeneration Delivery
Plan and seek approval for proposed funding allocations in
2026/27. 
Recommendation:  That Cabinet: 
a) Notes the progress made on the implementation of the
Regeneration Delivery Plan;
b) Approves the Regeneration funding proposals as detailed at
Appendix One;
c) Notes the update on previously secured or applied for funds
provided at Appendix Two;
d) Approves the proposed delegated authority changes
following service restructure; and
e) Provides delegated authority to the Executive Director
(Housing and Communities) to agree changes to the funding
allocations in Appendices One and Two in consultation with
the Portfolio Lead as required. 
1. Executive Summary 
1.1 The Regeneration Delivery Plan sets out our priorities for delivering on the
regeneration ambitions of the Council Plan and Community Wealth Building Strategy,
working in partnership with communities. 
1.2  The Plan focusses on the delivery of physical regeneration across North Ayrshire
through an ambitious project based rolling action programme. It informs our priorities
for securing and delivering against external funding sources including Scottish and UK
Government funds. This report provides an update on progress to date and proposals
for 2026/27. The regeneration funding landscape in 2026/27 is currently uncertain.
The delivery of several of the proposals outlined in the report is therefore subject to
the external funds being confirmed within appropriate timescales. 
2. Background 
2.1 The Council has placed the regeneration of communities at the heart of its agenda.
This focus is reflected within the priorities of the Council Plan and Community Wealth
Agenda Item 21
479

Page 480

Building Strategy. The Regeneration Delivery Plan sets out our priorities for delivering
on these ambitions and was approved by Cabinet on 23 March 2021. 
2.2 The Plan focuses on the delivery of physical regeneration in the period 2021 to 2026.
Informed by stakeholder consultation, reviewing existing community priorities and the
output of previous consultations, it aims to address local priorities, support changes
within communities and deliver a well-being economy. 
2.3 Actions in 2025/26 aimed to maximise the impact and leverage of investment,
including securing external funding to support and accelerate delivery. This included: 
• Delivery of a £1.450m programme of active travel design and construction
works through the Scottish Government’s (SG) Active Travel and Infrastructure
programme.
• Delivery of a £0.247m programme of bus stop shelter replacements and surface
reinforcement through the SG Bus Infrastructure Fund Tier 1.
• Partnership working with Strathclyde Partnership for Transport (SPT) to deliver
a £0.200m programme installing Real-Time Passenger Information signs across
the North Coast and Garnock Valley.
• Delivery of the Travel Smart behaviour change programme in communities and
workplaces, alongside cycle storage provision and route improvements,
supported by £0.281m grant funding from SPT’s People and Place Programme
and the SG People and Place Local Authority Direct Award.
• Partnership working with Walk Wheel and Cycle Trust to deliver a £0.101m
programme of active travel design and construction works.
• Delivery of the Beat the Streets behaviour change programme in Irvine.
• Approval of the local delivery plans for the £1.562m annual allocation for
2025/26 SG Vacant and Derelict Land Fund (VDLF).
• Preparation and submission of the annual Vacant and Derelict Land Survey
• Achieving a six percent decrease in VDL between 2024 and 2025. Twenty-four
sites (36ha) were brought back into productive use and removed from the
register.
• Conclusion of the Montgomerie Park Neighbourhood Centre land sale.
• Ongoing delivery and monitoring of the SG Place Based Investment
Programme, including community, heritage, culture and public realm
investment.
• Secured £1.169m from the SG Regeneration Capital Grant Fund to support the
delivery of Bourtreehill Village Regeneration.
• Provision of 8 further grants to sites through Stage 1 and 2 of the Repurposing
Property Grant Fund (RPGF) with a total value of £0.157m.
• Ongoing delivery and monitoring of the UK Government (UKG) Local
Regeneration Fund, including the contract award for 1,500m2 of new
commercial space at Annickbank Innovation Campus, and detailed design
development for commercial space at Kyle Rd, and i3, Irvine.
• Approval of the Irvine Pride in Place Regeneration Plan which will release
£19.8M of funding for the town over the next ten years.
• Securing an additional Pride in Place Programme for the Three Towns which,
on development and approval of their Regeneration Plan, will release £19.8M of
funding over ten years.
• Delivery of the UKSPF Communities and Place grant funding programme with
twenty-four local groups sharing £397,000, which included £250,000 of UKSPF
480

Page 481

support.
• Completion of the Ayrshire 5G Innovation Region project and establishment of a
new Ayrshire Digital Economy Ecosystem to continue the legacy of the project
• Completion of the Digital Infrastructure and Connectivity Plan.
• Implementation of the Smart Infrastructure Pilot Project at Irvine Harbourside. 
2.4 Significant levels of funding have been secured or are anticipated to support delivery
in 2026/27. The details of these funds and the proposed approach to their expenditure
are provided at Appendix One. These include the: 
• SG Active Travel Infrastructure Fund (ATIF) Tier 1 (provisional)
• SPT Capital Programme (provisional)
• SPT People and Place Programme (provisional)
• SG Bus Infrastructure Fund Tier 1 (provisional)
• SG People and Place Local Authority Direct Award (provisional)
• SG Regeneration Capital Grant Fund
• Crown Estates Scotland
• SG Vacant and Derelict Land Fund
• UKG Pride in Place Programme
• SG Islands Programme 
Updates on previously secured and applied for funds are provided at Appendix Two
including the: 
• UKG Smart Infrastructure Pilot Programme
• UKG 5G Innovations Regions
• UKG Shared Prosperity Fund (SPF)
• UKG Local Regeneration Fund (previously Levelling Up Round 3)
• SG Island Programme
• SG Regeneration Capital Grant Fund (RCGF)
• SG Place Based Investment Programme
• SG ATIF Tier 1 and Tier 2
• UKG Pride in Place Programme (previously Plan for Neighbourhoods) 
2.5 The current economic climate has resulted in several of the external funds that are
available to support the RDP having reduced budgets or being paused in the
current financial year. Combined with increased project costs, this will potentially
result in smaller numbers of projects successfully securing funding and being
delivered. 
2.6  Many of the funding awards are single year and their formal confirmation has been
delayed. This presents a significant risk to the associated project delivery. Officers
have reviewed proposals informed by this and have undertaken preparatory works
where possible to try and mitigate any impacts. There will however remain a risk to
delivery given the limited time between approvals being received and delivery
deadlines. 
2.7  Further consultation and engagement will be undertaken with local communities,
stakeholders and Elected Members through the detailed development of any
successful projects. 
481

Page 482

2.8 Following the formation of the shared Economic Development Service between
North and East Ayrshire Councils, the Regeneration Team moved to the
Communities and Housing Directorate from 1 June 2026. Delegated authority is
therefore requested for the Executive Director (Communities & Housing) to agree
changes to the funding allocations in Appendices One and Two in consultation with
the Portfolio Lead as required. Delegated authority regarding previous Cabinet
Regeneration approvals should also transfer over. 
2.9 The current Regeneration Delivery Plan covers the period from 2021 to 2026.
Officers are currently developing the next iteration of the Plan. This will be brought
forward to the Policy Advisory Panel and subsequently Cabinet for consideration
later in 2026. 
3. Proposals 
3.1 That Cabinet: 
a) Notes the progress made on the implementation of the Regeneration Delivery
Plan
b) Approves the Regeneration funding proposals as detailed at Appendix One
c) Notes the update on previously secured or applied for funds at Appendix Two
d) Approves the proposed delegated authority changes following service
restructure
e) Provides delegated authority to the Executive Director (Housing and
Communities) to agree changes to the funding allocations in Appendices One
and Two. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Regeneration Delivery Plan aims to build on and maximise the impact of the
investment being made through a variety of sources including the Ayrshire Growth
Deal, the Council’s Capital Programme, and the Strategic Housing Investment
Programme (SHIP). It also seeks to leverage private funding and investment into
North Ayrshire. It informs priorities for securing and delivering against external funding
sources. The implementation of action programme projects aligned to competitive
funding sources will be dependent on the success of the funding applications. Whilst
resource costs can be capitalised to support delivery, future ongoing revenue
implications need to be fully considered on a project-by-project basis. 
Human Resources 
4.2 The Regeneration Delivery Plan projects will be delivered through the existing
Regeneration Team resource. Opportunities to secure funding for additional staff
resource to support delivery will be investigated on a project-by-project basis as
required. 
Legal 
4.3 The legal implications of all Regeneration Delivery Plan projects will be considered
through their development. Legal agreements will be developed on a project-by-
482

Page 483

project basis as required with support from Legal Services. Negotiation will be
required in relation to land and building acquisitions with support from the Council’s
Legal Services and Property Management and Investment Service. Mechanisms such
as Compulsory Purchase Orders will be considered on a case-by-case basis, where
considered appropriate. 
Equality/Socio-economic 
4.4 The Regeneration Delivery Plan assists in meeting our socio-economic duty as set out
in the Fairer Scotland Duty. It seeks to reverse economic, social and physical decline
and reduce socio-economic disadvantage. It will tackle long-term vacant and derelict
land and buildings thereby reducing their levels and impact on communities. It aims to
build community wealth and tackle local deprivation through the regeneration of our
communities by maximising the potential of our land and assets and those of anchor
institutions. 
The Plan also contributes to the delivery of the Isle of Cumbrae and Isle of Arran
Local Island Plans, their key themes and priorities. The funding proposals will directly
contribute to several of the actions identified within the annual action programme. Any
proposals for the Scottish Government’s Islands Programme will be informed by the
Islands Plans and identified from the Action Programmes. 
An initial screening will be undertaken to establish if an Equality and Children’s Rights
Impact Assessment is required for projects on a case-by-case basis. 
Climate Change and Carbon 
4.5 The Regeneration Delivery Plan aligns with the Sustainable North Ayrshire Strategy
for 2024-2027. Furthermore, it aligns with the commitment to reduce carbon
emissions through declaration of a Climate Emergency. 
Key Priorities 
4.6 The Regeneration Delivery Plan has been informed by the priorities identified within
the Local Outcomes Improvement Plan and Locality Partnership priorities. The
implementation of the Plan will contribute to achieving the Council Plan priorities that
focus on Wellbeing, Communities and Local Democracy, Climate Change, and A
Sustainable Council. 
Community Wealth Building 
4.7 The Regeneration Delivery Plan sets out our priorities for delivering on the ambitions
within the 2024-2027 Community Wealth Building Strategy. Its delivery will have a
significant positive impact on the Council’s ambitions across the pillars of: 
• Land and Assets: by supporting equitable land development and the development
of underutilised assets for community and business use. 
• Procurement: by contributing to the development of the procurement wave plan;
through the inclusion of appropriate community benefit of local supplier clauses
within projects; and by creating local supply chain opportunities and support
delivery by smaller scale and local contractors where appropriate. 
483

Page 484

• Fair Employment: by supporting the creation of employment opportunities
particularly within the construction sector. Where North Ayrshire is procuring
services, through our enhanced Community Benefits approach we will seek to
ensure the creation of local training and work experience opportunities.
Consideration will also be given to delivery through employability programmes
where appropriate. 
• Financial Power: by investing in localities and leveraging external national
investment into North Ayrshire. 
Islands Communities Impact Assessment (ICIA) 
4.8 An initial screening will be undertaken to establish if an Islands Communities Impact
Assessment is required for projects on a case-by-case basis. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Regeneration Delivery Plan was the subject of extensive consultation including
workshops with Council Officers; workshops with Elected Members; reports to and
feedback from North Ayrshire Ventures Trust and the Community Wealth Building
Expert Panel; and public engagement via Consul. It was also informed by the Locality
Partnerships’ priorities and previous public consultation exercises including Charettes. 
5.2  The funding proposals outlined at Appendix One have been informed by this
consultation, and subsequent Place Plans that were developed by communities in
2024/25. Further consultation and engagement will be undertaken with local
communities, stakeholders and Elected Members through the detailed development of
the identified projects. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact insert officers name, Insert officer’s designation,
on Insert author’s phone number. 
Background Papers
Cabinet Report – Regeneration Delivery Plan, 23 March 2021 
Cabinet Report – Levelling Up Fund, 15 June 2021 
Cabinet Report – Levelling Up Fund – Round 2, 2 November 2021 
Cabinet Report – Regeneration Delivery Plan Update, 22 February 2022 
Cabinet Report – Regeneration Delivery Plan Funding Proposals, 07 June 2022 
Cabinet Report – Regeneration Delivery Plan Action Programme and Funding Proposals,
30 May 2023 
484

Page 485

Cabinet Report – Local Transport and Active Travel Strategy 2023-2028, 3 October 2023
Cabinet Report – Vacant and Derelict Land Strategy 2023-2028, 3 October 2023 
Cabinet Report – Long-Term Plan for Towns, 5 December 2023 
Cabinet Report – Levelling Up Round 3, 23 January 2024
Cabinet Report – Regeneration Delivery Plan Action Programme and Funding Proposals,
27 August 2024 
Cabinet Report – UK Government Shared Prosperity Fund, 18 February 2025 
Cabinet Report - Crown Estates Fund 2024/25, 18 March 2025 
Council Report - Irvine: Plan for Neighbourhoods, 14 May 2025
Cabinet Report - Regeneration Delivery Plan Action Programme and 
Funding Proposals Update 2025/26, 3 June 2025
Cabinet Report– Pride in Place Programme, 2 December 2025 
Cabinet Report – Pride in Place Impact Fund, 27 January 2026 
Council Report – Pride in Place, 20 May 2026  
485

Page 486

Appendix One – Regeneration Funding Proposals 
The following provides a summary of each of the funds and the proposed approach for 
2026/27. 
Vacant and Derelict Land Fund
The Scottish Government's Vacant and Derelict Land Fund (VDLF) aims to tackle the
presence of long-term vacant, for 15 years or longer, and derelict land in Scotland. In doing
so, it aims so stimulate economic growth, job creation, an improved environment and
quality of life. From its inception in 2007, access to the Fund was restricted to five local
authorities to focus the available financial resource and prioritise authorities most impacted
by both the extent of vacant and derelict land and levels of deprivation. 
An allocation of £1.525m has been confirmed for 2026/27. Aligned with the actions
identified in the Regeneration Delivery Plan and Vacant and Derelict Land Strategy, the
following projects have been identified following an evaluation of cross-service project
expressions of interest. Expressions of interest were evaluated by officers against the
following criteria: 
• Vacant and Derelict Land Fund Eligibility
• Aligned with Vacant and Derelict Land Fund Objective(s)
• Strategic Fit
• Match Funding
• Deliverability
• Sustainability
• Impact 
Due to the associated funding timescales, delivery plans have been developed and
submitted to the Scottish Government to allow Ministerial consideration. Submission to
Government noted the requirement for Cabinet approval before any spend would be
undertaken. 
Project Allocation
Redevelopment of Portland Rd. 
Delivery of fully serviced development platforms and enabling infrastructure,
ensuring the site is market‑ready for future commercial phases. In parallel,
serviced plots will be actively marketed for interim uses, including yard
space and self‑build opportunities. This will provide flexible, early options for
businesses and responding to immediate demand. It will also unlock the
redevelopment of Portland Road, Irvine, transforming underused land into a
strategic extension of the established Irvine Industrial Estate. 
£1.300m
Residential Development, Lochshore
Delivery of essential pre‑development work informed by the site masterplan
including refining access design from the A760, resolving drainage and
utilities issues, and preparing clear technical and design information that
significantly reduces risk for volume housebuilders and supports the creation
of a high-quality place. This will allow the Council to bring de‑risked land to
the market, attract developers and accelerate private‑sector investment. 
£0.225m
Total £1.525m 
486

Page 487

Crown Estate Scotland 
North Ayrshire Council is one of nineteen Local Authorities to receive a payment from the
net revenue generated by the Crown Estate Scotland’s (CES) marine assets out to twelve
nautical miles. Allocations should be used to deliver coastal community benefit and offer a
high level of flexibility.   
This is the seventh tranche of payments, which are made in arrears following the
finalisation of Crown Estate Scotland’s annual accounts. In December 2025, the Council
was notified that the 2025/26 allocation for North Ayrshire is £300,652.85 to be committed
in 2026/27. 
An annual report is required by CES on the benefits to the blue economy that the funding 
has supported. These can include: 
• Environmental Enhancement 
• Emissions Reduction or Removal of Waste 
• Jobs 
• Tourism 
• Skills Development 
• Diversification Projects 
• Investment For Community Purpose 
• Climate Change Adaptation 
The table below outlines the proposal for the expenditure of the allocation. The proposals
aim to support the delivery of actions identified in the Regeneration Delivery Plan that align
with the blue economy benefits identified in the annual report. The following projects have
been identified following an evaluation of cross-service project expressions of interest. 
Expressions of interest were evaluated by officers against the following criteria: 
• Crown Estate Scotland Fund Eligibility
• Aligned with Crown Estate Scotland Fund Objective(s)
• Strategic Fit
• Match Funding
• Deliverability
• Sustainability
• Impact 
Project Proposed
Allocation
Solar Powered Waste Compactors for the Islands of Arran and
Cumbrae
Provision of two mobile solar waste compactors for Arran and Cumbrae to
significantly improve the waste management system on both islands. This
includes the collection, storage and transport of litter collected by the
Streetscene Service on the islands, making it more sustainable and
reducing the associated carbon impact of collecting and transporting waste
on and from the islands.
£0.160m
Regeneration Officer
Match funding to resource a dedicated officer, coordinating partners,
communities and delivery, accelerating projects within the Three Towns
£0.041m
487

Page 488

Pride in Place programme, strengthening local capacity, leveraging
investment, and ensuring measurable, inclusive regeneration outcomes
aligned with local and regional priorities.
North Ayrshire Motorhome Parking Provision 
Development of proposals for the redevelopment of Bowencraig East Car
Park into a designated paid motorhome parking area as a pilot project.
£0.100m
Total £0.301m 
Regeneration Capital Grant Fund
The Scottish Government’s Regeneration Capital Grant Fund (RCGF) has been delivered 
annually in partnership with COSLA and local government. It supports locally developed 
place-based regeneration projects that involve local communities, help to tackle inequalities 
and deliver inclusive growth in deprived, disadvantaged and fragile remote communities 
across Scotland.   
In March 2026, North Ayrshire successful secured £1.169m to revitalise Bourtreehill Village
Centre. This follows Stage 1 and 2 submissions in 2025. The development will create three
new retail units to allow business continuity in the area ensuring that tenants and local
residents retain access to local services. This is alongside development of 32 new homes,
and wider investment in the nearby Bourtreehill Park. New family homes include the
provision of space for home working and are digital ready. 
The 2027/28 programme is yet to be announced, however, in anticipation of a potential call
for projects, the Regeneration team have worked cross service to identify suitable priorities.
The following proposal has been identified, and is currently being developed, should RCGF
funding be announced. 
Project Proposal
Irvine Beach Pavilion
Targeted capital improvements to redevelop the Beach Pavilion and
the wider Harbour Point area, enhancing key community assets and
the quality of the coastal environment.
Est. £1.400m
Total Est. £1.400m 
Pride in Place Impact Fund 
The Pride in Place Impact Fund (PiPIF) was announced on 25 September 2025, with a
prospectus published outlining the methodology, allocation and delivery mechanism for the
funding. North Ayrshire Council was directly awarded £1.5m of capital funding to deliver on
the PiPIF priorities. Funding was released across two financial years, with £0.75m received
in 2025/26, and a further £0.75m in 2026/27. 
The PiPIF aims to support three core objectives which the proposed delivery methodology
seeks to deliver across: 
• Community Spaces: investing in community facilities gives local people greater control
over the spaces that matter to them. Refurbishing or taking ownership of underused but
valued buildings. 
• Public Spaces: enhancing public spaces e.g. playparks, streetscape, signage, public art
– encouraging people to spend time outdoors, build relationships and take part in local
activities. 
488

Page 489

• High Street and Town Centre Revitalisation: making town and city centres more
attractive and welcoming, attracting people and supporting local businesses and
economies. 
The following allocation was agreed at Cabinet. 
Total Value Population
2022 Data
Location Council Led Community
Grant Fund
£0.514m 23,128  North Coast Locality £0.308m £0.206m
£0.439m 19,697  Garnock Valley Locality £0.263m £0.176m
£0.356m 15,707  Kilwinning Locality £0.214m £0.142m
£0.111m 4,611  Arran Locality £0.067m £0.044m
£0.015m N/A Participatory Budgeting £0 £0.015m
£0.065m Project officer support – 2 Year Temporary Post
£1.500m Overall Total 
The North Ayrshire Community Projects Fund launched in Spring 2026, with applications
received across the eligible localities. An assessment panel comprising representatives
from each of the locality partnerships, the local MP and a Council Officer was established.
The panel scored each application and will make recommendations to the relevant Locality
Partnerships for final approval. 
The remaining £852,000 is allocated to Council led projects. A cross-service expression of
interest process was undertaken. Expressions of interest were evaluated by officers against
the following criteria: 
• Pride in Place Impact Fund Eligibility
• Pride in Place Impact Fund Objective(s)
• Strategic Fit
• Match Funding
• Deliverability
• Sustainability
• Impact 
The shortlisted projects were shared with the Elected Members and MP for the relevant
wards of Arran, Kilwinning, Garnock Valley and North Coast. Feedback from Elected
Members was considered to inform the final list of projects which are now being progressed
by officers, with updates to be provided to the June 2026 Locality Partnerships and an
update on the outcome of the programme to Cabinet at a future date. All PiPiF spend must
be legally committed by 31 March 2027. 
Active Transport Infrastructure Fund – Tier 1 
The Active Travel Infrastructure Fund (ATIF) is managed by Transport Scotland on behalf
of the Scottish Government. ATIF supports the design, development, and delivery of active
travel infrastructure measures across all thirty-two local authorities in Scotland. 
Full details of the Tier 1 award for 2026/27 are still to be confirmed. The table below sets
out the 2026/27 proposals should the funding award match 2025/26 levels. This approach
aims to support a range of eligible projects across North Ayrshire and secure additional
funding to maximise and accelerate delivery. 
489

Page 490

Project Allocation
Active Travel Route Construction:
Delivery of the Local Transport and Active Travel Strategy Actions for
improving Active Travel Routes on strategic corridors and local links.
£369,123
Active Travel Facilities:
Delivery of the Local Transport and Active Travel Strategy Actions to
expand and improve facilities for cycling.
£35,000
Future Years Feasibility Studies and Design Development:
Support for the preparation of feasibility studies and preliminary designs
for active travel projects; and finalise projects to construction ready
status to enable bids to ATIF Tier 2.
£431,000
Route Monitoring:
Support for the network of pedestrian and cycle counters across North
Ayrshire including the installation of new infrastructure.
£9,604
Staff costs and resourcing:
Support for the existing externally funded posts within the Active Travel
and Transport Team.
£117,273
Total £962,000 
ATIF Tier 2 funding has also been applied for several of the projects included in the above
proposals. Should the Tier 2 funding be successful then Tier 1 allocations will be directed to
alternative projects. 
SPT Capital Programme 
SPT’s Capital Plan identifies the indicative programme of projects to be delivered annually
by SPT and partner organisations. Investment priorities are shaped by national, regional
and local transport strategies. At its meeting on 20 March 2026, the Partnership Board
approved the following projects for 2026/27, subject to Scottish Government grant funding
being received. 
Project Allocation
Ardrossan Harbour £250,000
Bus Corridor Improvements £150,000
Total £400,000 
SPT People and Place Programme (Revenue) 
The long-term success of Active Travel relies on strong alignment between infrastructure
delivery and behaviour change activity. Behaviour change programmes remain central to
achieving the ambitions set out in the Local Transport and Active Travel Strategy, the
National Active Travel Framework and the Cycling Framework for Active Travel. 
The SPT People and Place Programme supports active travel behaviour change and
access to bikes initiatives. In 2025/26, this programme contributed funding to the Council’s
Travel Smart Behaviour Change Programme. This included workplace engagement with a
range of businesses, delivery of active travel training, e bike sessions, walking programmes
and step count challenges, alongside personalised travel planning. 
SPT are still awaiting confirmation of their revenue funding from the Scottish Government.
They have advised that revenue funding this year is likely to be considerably lower than
490

Page 491

previous years. Regeneration officers are working with SPT to identify the minimum costs  
required to support the delivery of the programme. 
Project Allocation Requested
Support for the Travel Smart Behaviour Change Programme –
Communities and Workplaces
£157,000
Total £157,000 
Bus Infrastructure Fund Tier 1 
The Scottish Government’s Bus Infrastructure Fund Tier 1, managed by Transport
Scotland, supports the delivery of targeted bus priority and passenger infrastructure
improvements that enhance the reliability, accessibility and attractiveness of bus services.
The Fund focuses on measures that reduce journey times, improve passenger experience
and support modal shift to sustainable transport. Allocations for 2026/27 will support
investment in bus corridor improvements and key interchange locations across North
Ayrshire, aligned with the Local Transport and Active Travel Strategy and regional transport
priorities, and will help maximise the impact of wider investment in public transport. 
Full details of the award for 2026/27 are still to be confirmed. The table below sets out the
2026/27 proposals should the funding award match 2025/26 levels. This approach aims to
support a range of eligible projects across North Ayrshire and secure additional funding to
maximise and accelerate delivery. 
Project Allocation
Bus stop improvements and shelter replacement – across localities £288,000
Total £288,000 
People and Place Local Authority Direct Award 
The Scottish Government’s People and Place Local Authority Direct Award, managed by
Transport Scotland, supports active and sustainable travel behaviour change activity
alongside modest capital investment in supporting infrastructure. The funding focuses on
building local authority capacity, delivering community and workplace interventions and
providing light infrastructure that improves access to walking, wheeling, cycling and public
transport. 
Full details of the award for 2026/27 are still to be confirmed. The table below sets out the
2026/27 proposals should the funding award match 2025/26 levels. This approach aims to
support a range of eligible projects across North Ayrshire and secure additional funding to
maximise and accelerate delivery. 
Project Revenue
Allocation
Capital
Allocation
Support for behaviour change, staffing and activities,
investment in cycle parking, and delivery of light
infrastructure improvements.
£82,673.10 £41,336.55
Total  £124,009.65 
491

Page 492

Appendix Two – Project Updates 
Local Regeneration Fund (Formerly LUF3)
Approximately £17.5 million was secured from the UK Government’s Levelling Up Fund
Round 3 to deliver the Levelling Up for Ayrshire: Commercial and Low Carbon
Infrastructure programme, submitted by North Ayrshire Council. The funding programme is
now known as the Local Regeneration Fund. 
Informed by market feedback, the programme focuses on the delivery of new,
energy‑efficient commercial floorspace and associated low‑carbon infrastructure at key
employment locations, including Kyle Road, Annickbank and i3: 
• Kyle Road Phase 2: Delivery of c.1,200m² of new Class 4/5/6 business space at Irvine
Industrial Estate, capable of subdivision and building on the success of Phase 1.
• Annickbank Phase 4: Delivery of three 550m² Class 4/5/6 business units at Annickbank
Innovation Campus, Irvine, to complement existing provision.
• i3 Flex Space 02: Delivery of c.1,700m² of new industrial space, aligned with Ayrshire
Growth Deal proposals.
• Portland Rd. Irvine: Regeneration Services progressing proposals for the
redevelopment of the remaining land at Portland Road to expand the industrial estate,
delivering serviced land and flexible space to meet urgent demand, attract investment,
create jobs, and support growth.
• Active Travel Routes: East–west connections between commercial development areas,
including investment at Heatherhouse Road, Long Drive, Riverside Way and along the
River Irvine. The originally proposed Barassie–Gailes Roundabout link has been
identified as undeliverable within the funding timescales and is being progressed
separately. 
An updated Memorandum of Understanding has been agreed with the UK Government,
confirming that all project expenditure must be completed by 31 March 2028. The
Statement of Grant Compliance has been completed and submitted. The next monitoring
report was due on 29 May 2026. 
The current breakdown of the funding award and match funding is detailed below: 
Local Regeneration Fund Allocation Value
Commercial Estate: i3 Flex Space Phase 2 £4,706,259
Commercial Estate: Annickbank Phase 4 £4,588,817
Commercial Estate: Kyle Road Phase 2 £2,527,440
Commercial Estate: Portland Rd. £1,484,567
Active travel paths: Strategic Investment Route (River Irvine paths) £2,326,826
Active travel paths: Riverside Way, Irvine £849,680
Active travel paths: Long Drive, Irvine £939,120
Active travel paths: Heatherhouse Rd., Irvine £34,111
Total LRF Allocation £17,456,820  
Confirmed Additional Funding 
Vacant and Derelict Land Fund £2,478,865
North Ayrshire Council Capital Programme £2,000,000
Vacant and Derelict Land Investment Programme £892,990
Place Based Investment Programme £160,795
492

Page 493

North Ayrshire Regeneration Services £164,112
Active Travel Infrastructure Fund Tier 1 £250,000
Ayrshire Growth Deal £1,450,000
UK Shared Prosperity Fund £55,551
Access Path Network Programme £114,763
Total Confirmed Additional Funding £7,567,076  
Total £25,023,896 
Place Based Investment Programme   
The Scottish Government established the five-year £325m Place Based Investment 
Programme (PBIP) in 2021/22. Underpinned by the Place Principle, this aims to support 
community-led regeneration, town centres and the 20-minute neighbourhood ambitions. 
The main objectives of the Programme are to: 
• Link and align place-based initiatives and establish a coherent local framework to
implement the Place Principle;
• Support place policy ambitions such as town centre revitalisation, community led
regeneration, 20-minute neighbourhoods and Community Wealth Building;
• Ensure that all place-based investments are shaped by the needs and aspirations of
local communities; and 
• Accelerate the ambitions for tackling inequality and disadvantage, wellbeing and
inclusive economic development, net zero, community involvement and ownership 
PBIP has supported a wide range of projects, including shopfront and public realm
improvements, business and innovation space, heritage assets, climate action initiatives,
and extensive community infrastructure such as sports facilities, parks, play areas,
community cafés and halls. A significant strand of the programme is the Communities
Project Fund, which provides smaller grants to help local organisations deliver grassroots
projects and secure match funding. 
Outcomes to date include improved town centres, revitalised heritage buildings, new and
enhanced community facilities, increased outdoor activity and wellbeing opportunities,
strengthened community capacity, and progress towards net zero objectives. Many projects
report increased usage, visitor numbers, volunteering and local pride, contributing to more
resilient and attractive places. 
The following reallocations were approved during 2025/26, as per the delegated authority: 
Reallocation Approval 01
Reallocation of £102,500 from the Communities Project Fund allocation due to forecast
underspend to the following projects. Projects were identified through original cross-service
engagement that informed the 2025/26 Cabinet paper. 
Project Value
Hayocks Hall Community Larder
Upgrade of community larder provision using purpose built modular units.
£32,500
Cranberry Moss Community Centre Kitchen Refurbishment
Refurbishment of kitchen including the replacement of appliances, catering
equipment, ventilation works and redecoration.
£32,500
Shewalton Pond Access Improvements  £27,500
493

Page 494

Reconstruction of the banking to both protect the flora and fauna on site,
and to improve access to the pond for users.
Eglinton Park Improvements
Replacement of raised beds to enhance the visual impression of the
courtyard area and provide opportunities for raised planting for volunteers.
£10,000
Total £102,500 
Reallocation Approval 02
Due to increased tender returns in relation to Dockhead Street, works, it was agreed to
address the shortfall by reallocating £61,893 PBIP funding from Kyle Road Phase 2 and
£20,000 from the PBIP future year project development fund. This allowed the tender
award to be issued for a site start in May 2026. 
The current funding breakdown is outlined below: 
Project Budget
36 Bank Street  £139,999 
Annickbank Pavilion Ph3  £460,000 
Annickbank Pavilion Ph4  £10,795 
Beith Kirk  £41,000 
Communities Project Fund  £469,421 
Cranberry Moss Community Centre  £32,500 
Eglinton Park Improvements  £10,000 
Future Year Project Development  £11,369 
Future Year Project Development - AGD Great Harbour  £22,625 
Future Year Project Development - Forum Study  £18,150 
Future Year Project Development - Community Grant  £18,272 
Future Year Project Development - Irvine Railway  £17,440 
Future Year Project Development - WK Xmas  £1,030 
Galt House  £49,444 
Garnock Valley Place Framework - Beith Orr Park  £15,000 
Garnock Valley Place Framework - Ground in Garnock  £25,000 
Garnock Valley Place Framework - Play Links  £73,372 
Garnock Valley Place Framework - Report  £89,591 
Hayocks Hall Community Larder  £32,500 
Kilwinning Place Framework  £15,000 
Kilwinning Place Framework - Abbey Tower  £264,560 
Kilwinning Place Framework - Almswall Park  £25,665 
Kilwinning Place Framework – Community Grants  £51,344 
Kyle Road Phase 2  £88,107 
Largs Place Framework - Community Grants  £30,673 
Largs Place Framework - Outdoor Museum  £16,987 
Largs Place Framework - Vikingar  £37,340 
Lochshore Hub Play Area  £255,000 
Lochshore Park  £165,000 
PBIP Officer Costs  £139,914 
Public Space Camera  £50,000 
Repurposing Property Grant Fund  £157,942 
Saltcoats Dockhead Street  £331,893 
Saltcoats Place Framework - Betsy Miller Statue  £50,630 
Saltcoats Place Framework - Community Grants  £54,370 
494

Page 495

Shewalton Pond  £27,500 
Stevenstons Climate Action Town  £35,000 
Three Sisters, Largs  £895 
Town Centre Living Pilot - Howgate, Kilwinning  £53,805 
West Kilbride Shopfronts  £395,731 
Total  £3,784,863 
UK Shared Prosperity Fund (UKSPF)
North Ayrshire Council was awarded £2,697,397 to continue the delivery of UKSPF for an
additional year. The following proposals were agreed, under the three themes: 
• People and Skills: continue to support the delivery of the Employability and Skills
programme as in years 2 and 3 with essential skills support being delivered through the
Community Learning & Development Team closely aligned with the Employability
programme.
• Supporting Local Business: continue to deliver support to local business as in years 2
and 3 with the addition of capital investment to complement the revenue support. 
• Communities and Place: continue to deliver the Communities and Place Fund as in
years 2 and 3, with a smaller scale competitive grant fund, smaller scale council-led
regeneration projects and 1% of the overall fund towards participatory budgeting. 
Communities and Place had a total budget allocation of £674,348. UKSPF supported 24
community organisations across 2025/26, through a competitive grant fund. The fund was
made up of £250,000 UKSPF and levered in an additional £147,000 through the Place
Based Investment Programme. 
Council-Led projects were identified through a cross-service expression of interest process.
The following council led projects were agreed by Cabinet: 
Project Allocation
Dockhead Street, Saltcoats
Public realm improvements including full replacement of the block paving,
replacement drainage full length, upgraded lighting installation, new street
furniture.
£80,000
Seagate Castle
Additional funding to carry out essential stabilisation and conservation
works at Seagate Castle and support common good contribution.
£70,000
Lochshore Garden, Activity Hub and Associated Works
To support works to conclude Phase 1 of the Lochshore Masterplan,
including detailed design and delivery of access, green space,
infrastructure, facilities and environmental improvements.
£125,000
Public Space Camera
Re-deployable camera to support public safety and project delivery.
£30,000
Kilwinning – Development Funding
To support Kilwinning Abbey Tower, which was previously identified within
the Regeneration Delivery Plan, and the Kilwinning Main St public realm
enhancements.
£72,000
Total £377,000 
UKSPF will end in September 2026, with an extension of time offered by UK Government.
The Local Growth Fund will broadly replace the UKSPF through a more regional approach. 
495

Page 496

Pride In Place Programme – Irvine
In September 2023, the UK Government announced fifty-five towns across the UK,
including Irvine, that would benefit from up to £20 million of investment through endowment
style funding over a 10-year period. The programme is now known as the Pride in Place
Programme (PiPP). 
The Irvine Neighbourhood Board was established in August 2024. NAC Officers have
worked in partnership with the Board to develop a 4-year investment plan and ten-year
Regeneration Plan for Irvine. The Regeneration Plan was approved by UK Government in
March 2026, with delivery funding now in place. The Board are progressing with a wide
range of projects, in line with the investment plan, with an initial focus on Bridgegate
Enhance, Irvine railway station and the development of a community fund. 
Pride in Place Programme – Three Towns
As with Irvine, the PiPP for the Three Towns will fund a targeted £20M investment
programme over 10 years to help revitalize the communities through a series of approved
interventions which includes high street regeneration, housing and transport amongst
others. Funding can comprise capital contributions to infrastructure improvements or
revenue support for local groups/initiatives. 
The programme will be driven by a dedicated Neighbourhood Board led by an appointed
Chair and including local elected representatives. The Board, which is to be established by
17 July 2026, will be formed as a sub-group of the existing Three Towns Locality
Partnership to represent the community and its diverse interests.  The formation of the
board will be led by the newly appointed Chair. 
The immediate priority of the Board will be the development of the Three Towns
Regeneration Plan which will comprise a 10-year vision for the area and an investment plan
for the first four years.  The plan is to be submitted to UK Government by November 2026
and will outline the strategic aims and programme objectives. 
ATIF Tier 1 (25/26) Funding Update
On 3 June 2025, Cabinet approved the allocation and delivery approach for the 2025/26
ATIF Tier 1 programme. The programme supported the delivery of active travel route
construction, facilities improvements, and feasibility and design work to progress projects to
construction ready status, alongside investment in route monitoring infrastructure. Delivery
aligned with the Local Transport and Active Travel Strategy and supported the development
of a strong pipeline of projects for future funding rounds. 
The following projects were supported by the funding:
• Active Travel Route Construction/ Improvements:  
‒ Active Travel Route improvements in Beith/Kilbirnie 
‒ Active Travel Route improvements in Largs 
‒ Additional Drop Crossing at North Crescent Coastal Path, Ardrossan  
‒ Blacklands Recreation Ground Active Travel Improvements
• Active Travel Facilities:  
‒ Cycle parking at Eglinton Park Community Garden and Three Town Growers 
• Future Years Feasibility Studies and Design Development including preparing projects
for Tier 2 funding applications:  
‒ Pedestrian Accessibility Audit on Arran
‒ Putyan Burn Active Travel Route: submission of planning application and works to
prepare for construction.
496

Page 497

‒ Barassie to Gailes Active Travel Route Feasibility Study 
‒ Brodick to Glen Rosa Active Travel Route preparation for future construction
application
‒ Links to Eglinton Phase 2 Active Travel Route preparation for construction 
The table below summarises the approved and actual funding allocations. As reported to
Cabinet in June 2025, securing ATIF Tier 2 funding required elements of the original Tier 1
programme to be reallocated to other eligible projects. In addition, following a service
review, a proportion of staff costs was reallocated within the programme to reflect revised
resource arrangements. 
Project Allocation Actual
Active Travel Route Construction:
To support delivery of the Local Transport and Active Travel
Strategy Actions for improving Active Travel Routes on strategic
corridors and local links.
£442,000 £566,799
Active Travel Facilities:
To support delivery of the Local Transport and Active Travel
Strategy Actions to expand and improve facilities for Active Travel
such as eBike charging infrastructure and cycle stands.
£32,000 £27,867
Future Years Feasibility Studies and Design
Development: T
To support the preparation of feasibility studies and
preliminary designs for active travel projects; and finalise
projects to construction ready status to enable bids to ATIF
Tier 2.
£250,000 £93,028
LUF Match Funding: 
To support the delivery of the LUF Active Travel Projects.
£125,000 £125,000
Route Monitoring: 
To support the network of pedestrian and cycle counters
across North Ayrshire including the installation of new
infrastructure. 
£12,000 £12,096
Staff costs and resourcing: 
To support the existing externally funded posts within the
Active Travel and Transport Team. 
£101,000 £137,210
Total £962,000 £962,000 
ATIF Tier 2 (25/26) Funding Update 
As noted at Cabinet on 3 June 2025, applications for ATIF Tier 2 funding were submitted
and, where successful, progressed accordingly. The following projects were taken forward
using the Tier 2 allocation: 
• Links to Eglinton Phase 2 – Stage 1 Construction
• Old Caledonian Railway Saltcoats Phase 2 Active Travel Route preparation for Tier
2 construction application
• B777 Corridor improvements finalization of feasibility study
• Cumbrae Active Travel Route detailed design
• Sharphill to NCN Saltcoats Active Travel Route feasibility study
• Drybridge to i3 Active Travel Route feasibility study
• Girdle Toll to Irvine Active Travel Route feasibility study  
497

Page 498

ATIF Tier 2 (26/27) 
The Scottish Government’s Active Travel Infrastructure Tier 2 Fund supports the design
and construction of active travel infrastructure projects. 
The projects listed below were submitted for ATIF Tier 2 funding. The outcome of the bid
assessments is expected to be announced in May or June 2026, and it is anticipated that
not all projects will be successful. While funding is not guaranteed, submitting these
applications demonstrates the Council’s ambitions to Transport Scotland and provides a
clear view of the longer-term active travel project pipeline. 
Project Allocation
Brodick to Corrie Cycle Path - Phase 1 to Glen Rosa: Construction  £363,100
Cumbrae Active Travel Route: Consultation and preparation for Tier 2
Construction Application £91,850
Active Travel Links Putyan Burn, Dalry: Construction £730,904
Drybridge Active Travel Route: Detailed design and preparation for Tier 2
Construction Application £79,939
Girdle Toll to Irvine Active Travel Route: Detailed design and consultation £156,000
B777 Wider Corridor: Detailed design £179,820
Links to Eglinton Phase 2 – Stage 2 (Kilwinning Rd to Suspension Bridge):
Construction £265,000
Old Caledonian Railway AT Route - Phase 2: Construction £349,500
Old Caledonian Railway AT Route - Phase 2a to Academy: Detailed design
and preparation for Tier 2 Construction Application £67,552
Sharphill to NCN AT Route, Saltcoats: Consultation and preparation for Tier
2 Construction Application £83,200
Total £2,366,865 
People and Place Local Authority Direct Award (25/26) Funding Update 
On 3 June 2025, Cabinet approved the allocation and delivery approach for the 2025/26
People and Place Local Authority Direct Award. This programme supports delivery of the
Council’s Travel Smart Behaviour Change Programme, with funding applied to the following
activities:
• Minor active travel infrastructure improvements, including vegetation clearance to
improve route accessibility
• Installation of cycle parking at schools and community hubs across localities
• Delivery of Beat the Streets behaviour change programme in Irvine
• Delivery of a cycling festival in Saltcoats
• Maintenance of Real Time Passenger Information signs
• Ongoing support for the Council’s wider Travel Smart behaviour change activity 
Walk Wheel Cycle Trust (25/26) Funding Update 
Through partnership working with the Walk Wheel Cycle Trust (formerly Sustrans), the
Council secured funding to support active travel projects during 2025/26. Funding was
awarded to progress design and feasibility work on the following projects. 
Local Authority Total Award Revenue Capital 
North Ayrshire £124,009.65 £82,673.10 £41,336.55 
498

Page 499

Project Total
NCN7 – Crossing Improvements:
To carry out designs for improving the NCN crossings at
Meadowhead Road/Shewalton Road and at Church Street in Irvine
£39,724.00
Valefield Bridge, Kilbirnie:
To prepare a Ground Investigation specification and carry out an
options appraisal to replace the bridge
£60,959.50  
499

Page 500

500

Page 501

NORTH AYRSHIRE COUNCIL 
02 June 2026 
Cabinet 
Title:    Fleet Decarbonisation 
Purpose:  The purpose of this paper is to update Cabinet on progress
made to date with decarbonisation of the Council Fleet and to
provide details of the further proposed decarbonisation-first
approach work going forward. 
Recommendation:  It is recommended that Cabinet:
• notes the progress made to date in decarbonising the fleet,
and against the actions set out in the May 2023 Cabinet
paper.
• agrees the decarbonisation-first approach for fleet
replacement outlined at para 2.17
• notes that the Council’s current fleet decarbonisation actions
will continue to evolve to reflect the Scottish Government’s
refreshed Climate Change Plan 2026-2040 and the awaited
public sector fleet decarbonisation action plan. 
1. Executive Summary 
1.1 Significant progress has been made in decarbonising the Council Fleet which already
includes 87 EVs. In addition, there are a number of further 24 Internal Combustion
Engine (ICE) vehicles identified for replacement in the current financial year. 
1.2 Ongoing expansion of the EV charging network has also continued and has seen
additional provision for both workplace and public electric charging network points
across the Authority. The imminent commencement of the Scottish Government
funded charging network expansion across Ayrshire will also see an additional 307
public charge points being rolled-out across Ayrshire, 107 of which will be in North
Ayrshire. 
1.3 The Scottish Government’s Climate Change Plan was updated in March 2026 and
during 206/27, our fleet decarbonisation actions will be refreshed to align with the
updated plan. 
Agenda Item 22
501

Page 502

1.4 A Decarbonisation-First approach will be adopted to ensure the transition to a
decarbonised fleet can be effectively managed and delivered. 
2. Background 
2.1 In the Programme for Government of 2019, as part of a “Mission Zero” for transport,
the Scottish Government made the commitment of: “creating the conditions to phase
out the need for all new petrol and diesel vehicles in Scotland’s public sector fleet by
2030, and phasing out the need for all petrol and diesel cars from the public sector
fleet by 2025”. 
2.2   Progress continues to be shaped by the availability of suitable Electric Vehicle
alternatives and charging infrastructure at both national and local level. While these
conditions are still developing, overall public fleet decarbonisation has reached 19%
during this period, providing a strong foundation for further transition as technology
and infrastructure continues to improve. 
2.3  The challenges of decarbonising transport, and of the wider journey to net zero, are
now well recognised in Government policy. This is reflected in the latest iteration of
the Scottish Government’s Climate Change Plan (2026 to 2040), where earlier stretch
targets have evolved into Carbon Budgets, helping to provide a more practical and
sustainable framework for long-term progress. 
2.4  The plan also recognises that, in 2019, the Scottish Government set ambitious staged
targets for public sector fleet decarbonisation, focused on different vehicle types and
supporting the phased removal of petrol and diesel vehicles, beginning with cars,
followed by light vans and then heavier and more specialist vehicles.
2.5  Scottish Government has worked with the public sector to develop a draft public
sector fleet decarbonisation action plan and is now consulting key stakeholders
across the public and private sectors on the actions identified within that plan.
Publication of the final version is awaited. In the meantime, the Council will continue to
take a decarbonisation-first approach, prioritising suitable lower-emission and zero-
emission vehicle options wherever these are available and practical.
2.6  The draft action plan reflects the continued commitment of Scottish Government and
the wider public sector to fleet decarbonisation, helping to strengthen support for the
procurement of electric and ultra-low emission vehicles and identifying actions that will
further align public spending with emissions reduction. 
North Ayrshire Council’s Progress 
2.7 In May 2023 a report was presented to Cabinet providing an update on the Fleet
decarbonisation journey. A variety of recommendations and next steps were agreed in
support of decarbonising the Council’s vehicle Fleet which would support the
Council’s commitment to achieve net zero carbon emissions by 2030. 
2.8 The actions and recommendations, which are incorporated into the Fleet Asset
Management Plan, were in line with advice received from our external advisors (EVP
502

Page 503

solutions) and national commitments and ambitions within the 2019-2020 Programme
for Government. Significant progress has been made in delivering on these, in
summary: 
• Vehicle Purchase: The transition to a lower-emission fleet is well underway, with 87
vehicles already replaced by electric alternatives and further progress continuing as
the market develops.
• Budget Utilisation: Existing investment has supported strong early delivery, with 87
EVs now in place and at least 24 more zero-emission vehicles planned for 2026/27.
• Preparatory Work: EV deployment is being supported by practical driver
engagement and training, helping staff build confidence and make the most effective
use of new vehicles.
• Government Lobbying: The Council is making good use of national and regional
partnerships to strengthen its case for support and maximise future funding
opportunities.
• Capital Programme Review: Additional approved investment in vehicles and
charging infrastructure is providing a stronger foundation for continued fleet
decarbonisation.
• Heavy Fleet Research: Positive progress has also been made for the heavy fleet,
with HVO successfully introduced within our refuse collection vehicles as a practical
interim measure to support emission reductions.
• Digital Strategy Opportunities: Telematics data is giving a clearer understanding
of fleet use, supporting smarter vehicle replacement, better route planning and more
targeted charging infrastructure.
• Governance: Governance arrangements have been strengthened through the
creation of a dedicated officer fleet decarbonisation group reporting into the already
established Climate Change Steering Group partnership.
• Partnership Synergies: Partnership working continues to create opportunities for
collaboration, with regular reporting helping to keep fleet decarbonisation firmly on
the shared agenda.
• Charging Infrastructure: Completed and ongoing planned expansion of EV
charging across Ayrshire will create valuable opportunities to support both public
access and future fleet charging needs.
2.9 Work continues in transitioning to zero-emission fleet vehicles and progress has been
made in terms of investment in both EVs (Electric Vehicles) and supporting charging
infrastructure with additional/revised investment being approved in February 2024,
with a further £5.430m being allocated within the capital plan to support the
decarbonisation of the Council’s fleet, supplementing the main vehicle replacement
programme. 
2.10 A previous EV working group has now been progressed into a fleet decarbonisation
group, which is being supported by the Transformation Team. The group reports to
our already established Climate Change Steering Group, which although without
decision making powers, was established to coordinate progress in implementing the
Sustainable North Ayrshire Strategy. 
2.11The fleet decarbonisation group provides a forum to consider and implement a number
of fleet decarbonisation actions and priorities in a collaborative way ensuring user buy
in through considering service and operational needs to be met whilst continuing
503

Page 504

progress in decarbonising the fleet. The key objectives of the group, which consists of
cross directorate representatives, is to oversee and manage the ongoing
implementation and development of the decarbonisation of the Council’s vehicle fleet.
The activities include, refreshing, monitoring and implementation of the
decarbonisation plan, co-ordination of activity across all the relevant services within
the Council and reporting on progress. 
Current Position and Opportunities 
2.12 Cabinet approval in May 2023 marked an important step forward in the transition to a
more sustainable decarbonised fleet. Good progress has been made in relation to the
acquisition of suitable alternative electric vehicles, where we currently operate 87
EVs, which equates to 21.9% of the initially identified number of fleet vehicles. 
2.13 The Council continues to make positive progress in planning for fleet decarbonisation
in the short to medium term, while recognising that not all of the remaining 344
vehicles currently have suitable zero-emission alternatives available. The greatest
opportunities for transition are within vehicle types where the market is developing
most quickly, while for larger vehicles, sweepers and plant, suitable electric options
are still emerging. 
2.14 The Transport team continues to work proactively with a range of manufacturers to
arrange demonstrations and pilots of electric equivalent vehicles. This is providing
valuable insight into how well different options can support service needs and is
helping to identify the areas where further development in charging, payload, range
and towing capability will strengthen future opportunities for transition.
2.15 Several pilots have been successful which will result in a further 24 vehicles (at a cost
of £1.10m) being replaced by zero emission alternatives during 2026/27. This will
increase the number of EV’s within the fleet to 111 and 27.95% of the identified fleet. 
2.16 Work will continue to progress in the decarbonisation of the fleet through a
decarbonisation-first approach which will ensure our net-zero journey and service
delivery needs going forward. 
Decarbonisation First Approach 
2.17 To maximise progress and outcomes, whilst still recognising operational needs and
vehicle replacement availability, the Council has a clear opportunity to adopt a
decarbonisation-first approach to fleet vehicle replacement. Where available,
decarbonised fleet options will be progressed as first option. However, in the limited
cases where suitable low-emission alternatives are not yet available, suitable vehicles
with the latest Euro engine technologies for ICE vehicles will be procured. This will
support a planned and practical transition, allowing time for further pilots to be
completed, additional EV alternatives to be identified, and the necessary supporting
infrastructure works to be progressed. The following diagram illustrates this
decarbonisation-first approach. 
504

Page 505

EV Charging Framework
2.18 To facilitate the position where Ultra Low Emission Vehicles (ULEVs) can be
successfully deployed into the Council’s fleet, an overall charging framework,
including infrastructure, policy and guidance, also needs to be in place. 
2.19 The Council is already making strong progress in expanding workplace charging, with
56 workplace charge points installed to date, equating to 107 sockets. Previous
assessments identified a potential need for a comprehensive charging framework.
While delivering this will require a phased and coordinated approach, the key areas
for development are now well understood, including: 
• Identifying the most suitable locations for future charge points
• Working through premises ownership arrangements to support delivery
• Assessing available power capacity to inform future investment
• Completing pre-engagement work to support the procurement process 
2.20 In addition to 56 workplace charging units, the Council has installed 62 publicly
available EV charge points, adding to the 80 privately owned publicly available
charge points across North Ayrshire.  £2.87m of funding has been secured from
Transport Scotland for North, East and South Ayrshire Councils to secure a private
sector partnership to install a further 307 charge points across Ayrshire. 
2.21 A procurement exercise has been undertaken, led by East Ayrshire Council, this
contract will commence in June 2026. Part of this procurement activity included a
specific lot for fleet EV charge point installation, supporting a more efficient roll out of
workplace charge points. We will utilise this to expand the number of work-place
505

Page 506

charge points available, which will be funded through the Council’s already allocated
fleet decarbonisation budget. The anticipated spend for 26/27 will be circa £600k. 
3. Proposals 
3.1 It is recommended that Cabinet:
• notes the progress made to date in decarbonising the fleet.
• agrees the decarbonisation-first approach for fleet replacement outlined at para
2.17
• notes that the Council’s current fleet decarbonisation actions will continue to
evolve to reflect the Scottish Government’s refreshed Climate Change Plan
2026-2040 and the awaited public sector fleet decarbonisation action plan
4. Implications/Socio-economic Duty 
Financial 
4.1 The Council has reprofiled its fleet decarbonisation budget to reflect a realistic pace
of delivery, with £2.029m planned for 2026/27, including £1.429m for vehicles and
£0.600m for charging infrastructure, and a further £2.702m in 2027/28. 
Alongside the wider vehicle replacement programme, which provides £2.99m in
2026/27 and £2.00m per year thereafter, this supports a coordinated
decarbonisation-first approach to replacing vehicles and expanding the charging
network over the coming years. 
The Sustainability Team continue to apply for external funding to support the roll-out
of fleet decarbonisation infrastructure. 
Human Resources 
4.2 Development of a comprehensive charging framework will require support from the
workforce in order to be successfully implemented. 
Legal 
4.3 Fleet decarbonisation is a practical legal expectation arising from statutory climate
duties under the Climate Change (Scotland) Act 2009, associated reporting
regulations, and statutory guidance issued in March 2026. Fleet emissions are
classed as direct (Scope 1) emissions, meaning councils are legally required to take
proportionate action to reduce them, report progress annually, and demonstrate
alignment with Scotland’s 2045 net-zero target. 
Equality/Socio-economic 
4.4 None 
Climate Change and Carbon
506

Page 507

4.5 Decarbonisation of the Council’s vehicle fleet is a critical element of the Sustainable
North Ayrshire Strategy. 
Key Priorities 
4.6 The decarbonisation of the Council fleet directly supports the Council’s net-zero
priority. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8  None 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 The Cross Directorate Working Group and Climate Change Steering Group are
consulted on the decarbonisation of the fleet proposals.   
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Laurence Cree, Head of Sustainability, Transport
& Corporate Property, on 01294 323960. 
Background Papers
0
507

Page 508

508