MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Kirsty Sweeney, Area Team Leader (Bute, Cowal, Helensburgh and
Lomond)
Tim Williams, Area Team Leader (Oban, Lorn and the Isles)
Stuart Ramsay, Senior Planning Officer
Emma Shaw, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey and Mark Irvine. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in planning application
reference 23/00185/PP as he was a personal friend of the leaseholder of the land. 
Councillor Dougie Philand also declared a non-financial interest in planning application
reference 24/00564/PP as he was appointed to the Fyne Homes Management Board by
the Council.   He confirmed that he would leave the meeting and take no part in the
consideration of both these applications which were dealt with at items 5 and 7 of this
Minute. 
Councillor Graham Hardie declared a non-financial interest in Enforcement Case
Reference 15/00051/ENAMEN as he was a personal friend of the landowner.  He
confirmed that he would leave the meeting and take no part in the consideration of this
case which was dealt with at item 15 of this Minute. 
Councillor Peter Wallace also declared a non-financial interest in planning application
reference 24/00565/PP dealt with at item 7 of this Minute.  Having taken note of the
Standards Commission Guidance in relation to declarations (issued on 7 December
2021), with specific reference to section 5.4(c), he did not consider that he had a relevant
connection and as such would remain in the meeting. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 21
August 2024 at 11.00 am was approved as a correct record.

Page 2

b) The Minute of the Planning, Protective Services and Licensing Committee held on 21
August 2024 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 29
August 2024 was approved as a correct record. 
4. BEATON AND MCMURCHY ARCHITECTS LTD: SITE FOR THE ERECTION
OF DWELLINGHOUSE: LAND NORTH OF LYNBURN, ROWAN ROAD,
OBAN (REF: 22/01986/PPP) 
The Planning Officer spoke to the terms of the report.  This application was presented to
the PPSL Committee on 21 February 2024 and was granted subject to conditions and the
conclusion of a Section 75 Agreement. 
A supplementary report advised Members of a change in circumstances regarding the
legal control over the relevant section of land that negates the requirement for a Section
75 Agreement. 
Members were asked to note the content of this report, which did not introduce any new
information that had not already been addressed in the original report of handling.  It was
also recommended that planning permission be granted subject to the conditions and
reasons appended to this report. 
Decision 
The Committee noted the contents of the report and agreed to grant planning permission
subject to the following conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in Conditions 3, 4, 5, 7, 8 and 9 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details.  
Reason: In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
2. PPP - Approved Details 
The development shall be implemented in accordance with the details specified on the
application form dated 30.09.2022 supporting information and, the approved drawings
listed in the table below.

Page 3

Plan Title. Plan Ref. No. Version Date Received
Site Plan &
Section 
2034 02 B 13.10.2022
Site & Location
Plans 
2034 03 B 13.10.2022
Cross Sections 2034 04   01.12.2022
Site & Location
Plans Road
Improvements
Proposals 
2034 07 A 06.02.2024
Junction Site
Plan as
Proposed 
2034 11   06.02.2024 
Reason: To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013. 
3. Timescale to be Agreed for Completion 
Pursuant to condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and
approved by the Planning Authority. Thereafter, the development shall be implemented
in accordance with the duly approved timescale for completion unless an alternative
timescale for completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
4. Vehicular Access, Parking and Turning 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the means of vehicular access and parking/turning arrangements to serve the
development have been submitted to and approved by the Planning Authority. Such
details shall incorporate: 
i) The upgrade of the existing access at the connection with the public road in
accordance with the Council’s Roads Standard Detail Drawing SD08/002a with
visibility splays measuring 2.4 metres to point X by 25 metres to point Y; 
ii) The provision of a parking and turning area in accordance with the requirements
of Policy LDP 11 and Supplementary Guidance SG LDP TRAN 6 of the adopted
‘Argyll and Bute Local Development Plan’ 2015; 
iii) The provision of a footway to be provided over the total length of the private
road; 
iv) A road carriageway with a minimum width of 3 metres; 
v) The provision of passing places in accordance with Operational Services
Drawing 08/003a at locations approximately 50m, 90m and 180m from the
junction with the public road;

Page 4

vi) The provision of a turning head in accordance with Figure 18 of The Roads
Development Guide to be provided at the location where the private road
separates to serve the dwellings leading to ‘Toriskay’ and the dwellings leading
to ‘High Acres’ / ‘Rowan Hill’, with a bin storage area to the rear of the turning
head; 
vii) The provision of street lighting ducting to be installed from the junction with the
public road to the location where the private road separates to serve the
dwellings leading to ‘Toriskay’ and the dwellings leading to ‘High Acres’ /
‘Rowan Hill’; 
Prior to any work starting on site, the visibility splays shall be cleared of all obstructions
such that nothing shall disrupt visibility from a point 0.6m above the road carriageway
at point Y and the visibility splays shall be maintained clear of all obstructions
thereafter. 
The approved scheme of road improvement works shall be fully implemented prior to
any works commencing in relation to the construction of the dwelling. The developer
shall provide written notification to the planning authority upon completion of the
approved road improvement works and shall not proceed with any further development
within the application site boundary until such time as written confirmation has been
received from the planning authority, in consultation with the Council’s Roads
Engineers, that the completed road improvements are satisfactory. 
Reason: In the interests of road safety. 
Note to applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
5. PPP – Availability of Connection to Public Water Supply 
Pursuant to Condition 1 - no development shall commence on site until authorisation
has been given by Scottish Water for connection to the public water supply.
Confirmation of authorisation to connect shall be provided in writing to the Planning
Authority before commencement of development. 
Reason: To ensure that the development is adequately served by a public water
supply. 
Note to Applicant: 
• In the event that a public water supply connection cannot be obtained an alternative
private water supply would constitute a material amendment requiring the
submission of a further planning application.

Page 5

6. Sustainable Drainage System 
Notwithstanding the provisions of Condition 2, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter.  
Reason:  To ensure the provision of an adequate surface water drainage system and
to prevent flooding.    
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk . 
7. Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the dwellinghouse has been
submitted to and approved by the Planning Authority. These details shall incorporate: 
i) A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006;  
ii) A statement addressing how the proposed development has been designed to
be consistent with the six qualities of successful places, as defined within Policy
14 of NPF4;  
iii) Local vernacular design; 
iv) Maximum of one and three quarter storey in design;  
v) Rectangular footprint with traditional gable ends;  
vi) Symmetrically pitched roof angled between 35 and 42 degrees finished in
natural slate or good quality artificial slate;  
vii) External walls finished in white wet dash roughcast, white smooth render,
natural stone, timber cladding or a mixture of these finishes;  
viii) Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site, along with details of the existing and
proposed site levels shown in the form of section drawings, contour plans, site
level surveys, or a combination of these;  
ix) Windows with a vertical emphasis; and 
x) Details of an area within the application site for the placement of
refuse/recycling bins.

Page 6

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surroundings. 
8. Landscaping and Biodiversity Enhancement 
Pursuant to Condition 1 - no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by
the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;  
ii) Surface treatment of proposed means of access and hardstanding areas;  
iii) Any proposed re-contouring of the site by means of existing and proposed
ground levels;  
iv) Proposed hard and soft landscape works; and  
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme.  
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use.  
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority.  
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.  
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
9. Pre-commencement Survey 
Pursuant to Condition 1 - no development or other work shall be carried out on the site
until a pre-commencement survey for the presence of nesting birds has been carried
out by an appropriately qualified person and has been submitted for the written
approval of the Planning Authority. In circumstances where species of interest are
identified as being present, or at risk from construction works, the survey shall further
provide suggested avoidance and or mitigation measures, including timing constraints,

Page 7

to address such presence or risk. The development shall be implemented in
accordance with the measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
(Reference: Supplementary Report Number 2 dated 4 September 2024, submitted) 
Having previously declared an interest in the following item, Councillor Dougie Philand left
the meeting at this point. 
5. TORLOISK ESTATE: CONVERSION AND EXTENSION OF STONE BARN
TO FORM DWELLINGHOUSE, INSTALLATION OF SEPTIC TANK AND
FORMATION OF VEHICULAR ACCESS: LAND WEST OF LAGGANULVA
FARM, ULVA FERRY, ISLE OF MULL (REF: 23/00185/PP) 
The Planning Officer spoke to the terms of the supplementary report number 4.  This
application was presented to the Committee on 22 May 2024 and the Committee agreed
to request from Planning Officers information on what impact this proposed development
would have on access to, and operation of, the remaining agricultural land in terms of
Policy 83 of LDP2 – Safeguarding Agricultural and Croft Land. 
Planning Officers sought further information from both the Applicant and the tenant farmer
and this has now been received.  A request was made to continue consideration of the
application until the information received could be assessed. 
Decision 
The Committee agreed to note the content of the report and continue consideration of this
application until the information received had been assessed. 
(Reference: Report by Head of Development and Economic Growth dated 8 May 2024,
supplementary report number 1 dated 21 May 2024, supplementary report number 2
dated 10 June 2024, supplementary report number 3 dated 12 August 2024 and
supplementary report number 4 dated 4 September 2024, submitted) 
Councillor Philand returned to the meeting. 
6. BAKKAFROST SCOTLAND LTD: FORMATION OF FISH FARM (ATLANTIC
SALMON) INCORPORATING 8 X 160M CIRCUMFERENCE CIRCULAR
CAGES AND SITING OF FEED BARGE: WEST OF ISLE OF GIGHA (REF:
23/01758/MFF) 
The Major Applications Team Leader spoke to the terms of the report and to
supplementary report number 1 which advised of an error in paragraph 4.2 of the main
report of handling and late representations received.  This application is for the installation
of a new marine fish farm for the farming of Atlantic salmon in the Sound of Jura
approximately 450 m west of the Isle of Gigha.  The site would comprise 8 x 160 m
circumference pens in a 2 x 4 formation along with a 600 tonne feed barge which would
be located at the centre of the group on the shore side.  The site would be serviced from
the Company’s existing shore base located on the north east side of the Isle of Gigha.

Page 8

The proposal has attracted 31 objections and 16 expressions of support.  An objection has
also been raised by Gigha Community Council in their capacity as statutory consultee and
they have requested that Members visit the site. 
Given the level of interest in the application and the complexity of the issues raised, it was
recommended that Members give consideration to holding a pre-determination hearing in
advance of determining this application. 
Decision 
The Committee agreed:- 
1. to hold a discretionary pre determination hearing at the earliest opportunity on a hybrid
basis within the Council Chamber, Kilmory, Lochgilphead and by Microsoft Teams; and 
2. to hold a site visit in advance of the date of the hearing. 
(Reference: Report by Head of Development and Economic Growth dated 5 September
2024 and supplementary report number 1 dated 17 September 2024, submitted) 
Having previously declared an interest in the following item, Councillor Dougie Philand left
the meeting at this point. 
7. FYNE HOMES: ERECTION OF EIGHT AFFORDABLE DWELLINGHOUSES
AND FORMATION OF VEHICULAR ACCESSES: VACANT LAND AT
JUNCTION OF BALLOCHGOY ROAD AND BLAIN TERRACE, ROTHESAY,
ISLE OF BUTE (REF: 24/00564/PP) 
The Area Team Leader spoke to the terms of the report.  Planning permission is sought
for the erection of eight dwellinghouses on a grassed area of land measuring 0.23
hectares in Rothesay, Isle of Bute.  The proposal comprises four dwellinghouses (two
semi-detached blocks) along the Ballochgoy Road frontage and four dwelling houses (two
detached blocks and semi-detached block) along the Prospect Terrace frontage. 
The site is located within the ‘Main Town’ of Rothesay as identified in the adopted Argyll
and Bute Local Development Plan (LDP2) and given that it was previously occupied by
flatted blocks but is now grass, it represents brownfield land that has become naturalised. 
A sixteen signature petition objecting to the application has been submitted and a
representation has also been received, which neither advances support nor expresses
objection. 
Planning Officers consider the proposal to be consistent with the relevant provisions of the
Development Plan and there are no other material considerations of sufficient significance
to indicate that it would be appropriate to withhold planning permission. 
It was recommended that planning permission be granted subject to the conditions,
reasons and information notes detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions,
reasons and informative notes:

Page 9

Standard Time Limit Condition for Planning Permission (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified on the application form dated
22nd March 2024; the Addendum dated 3rd April 2024; supporting information; and the
approved drawings listed in the table below unless the prior written approval of the
Planning Authority is obtained for an amendment to the approved details under Section
64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received
Location Plan  Drawing No. 7860/LOC   -  28.03.2024
Existing Site Plan Drawing No. 7860/01 B  04.04.2024
Proposed Site
Plan 
Drawing No. 7860/02 F 22.08.2024
House Type B   Drawing No. 7860/03 D 28.03.2024
House Type E   Drawing No. 7860/04 D 04.04.2024
Street Elevations
as Proposed  
Drawing No. 7860/05 A 25.03.2024
Existing Below
Ground Drainage
Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00030
P01 25.03.2024
Existing Below
Ground Drainage
Layout
(Remediation) 
Drawing No. 312115-
HAH-XX-XX-D-C-00031
P02 25.03.2024
Proposed Below
Ground Drainage
Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00032
P03 25.03.2024
Proposed External
Levels Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00040
P04 25.03.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.

Page 10

2. Parking Spaces and Dropped Footways 
Unless otherwise agreed in writing with the Planning Authority, prior to the
development first being occupied, the following works shall be completed in
accordance with the details shown on the approved Drawing No. 7860/02 Rev F
‘Proposed Site Plan’: 
• The parking areas within the curtilage of each dwellinghouse and the visitor parking
spaces shown as V1 and V2 shall be laid out and surfaced and shall thereafter be
maintained clear of obstruction for the parking and manoeuvring of vehicles 
• The entire length of the footway along Ballochgoy Road between the westernmost
parking bay at Plot 8 and the easternmost parking bay at Plot 5 shall be dropped 
• The entire length of the footway along Prospect Terrace between the northernmost
parking bay at Plot 1 and the southernmost parking bay at Plot 4 shall be dropped 
Reason: In the interests of road and pedestrian safety. 
3. Visibility Splays 
Prior to the occupation of each individual dwellinghouse, sightlines of 42 metres in both
directions, measured from a distance of 2.4 metres back from the edge of the public
road at the centre point of the two in-curtilage parking spaces, shall be cleared of all
obstructions above a height of 1.05 metres from the level of the road and thereafter
maintained as such in perpetuity. 
Reason: In the interests of road and pedestrian safety. 
4. Removal of PD Rights - Dwellinghouses 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Class 1D and 2B of the
aforementioned Schedule, as summarised below:  
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to its
roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Reason: To prevent the formation of additional window/door openings or dormer
windows which may give rise to a loss of privacy to adjoining property without prior
assessment on application by the Planning Authority; which would otherwise be
capable of being carried out under Article 2(4) of the Town and Country Planning
(General Permitted Development) (Scotland) Order 1992 (as amended).

Page 11

5. Secure Affordability by Restricting Development to RSL 
The development hereby permitted shall only be implemented by a Registered Social
Landlord (a body registered under part 3 chapter 1 of the Housing (Scotland) Act 2001,
or any equivalent provision in the event of the revocation and re-enactment thereof,
with or without modification) and shall not enure for the benefit of any other person,
company or organisation. 
Reason: To ensure the provision of affordable housing to the standard required by the
development plan in the absence of any other agreed means of securing such
provision. 
6. Timescale to be Agreed for Completion 
Prior to development commencing, details of the proposed timescale for completion of
the approved development shall be submitted to and agreed in writing with the
Planning Authority. Thereafter, the development shall be implemented in accordance
with the duly approved timescale for completion unless an alternative timescale for
completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
7. Electric Vehicle Charging 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in
writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed.  
The approved charging point or, where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority.  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
8. Surface Water Drainage 
No development shall commence on the site until written evidence has been submitted
to the Planning Authority that Scottish Water (or any of its successors as the
organisation responsible for the public waste water treatment system) has authorised
the connection of surface water drainage from the site into the combined sewer. Such
evidence shall include full details of the design of the surface water drainage system
that has been agreed with Scottish Water and the approved arrangements shall be
fully installed prior to the occupation of the dwellinghouses. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding.

Page 12

9. Landscape/Surface/Boundary Treatment and Biodiversity Enhancement 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground
levels;
iv) Proposed hard and soft landscape works including the details of the retaining walls;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
10. Construction hours 
In order to minimise, as far as necessary, the level of noise and/or vibration to which
nearby existing residents will be exposed during the erection of the dwellinghouses,
the hours of working in relation to the construction of the development on the site
should be restricted to 08.00 to 18:30 Monday to Friday and 08.00 to 13.00 on
Saturdays. There should be no operations on Sundays or Bank Holidays. All
operations should be undertaken in compliance with best practicable means for noise
and vibration control as documented in BS 5228- 1:2009+A1:2014 and BS 5228-
2:2009+A1:2014. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
11. Provision of Screening to Prevent Interlooking Between Habitable Room
Windows 
Prior to the occupation of the dwellinghouses identified on the approved plans as Plot
Numbers 7 and 8, details of those screening measures that are to be implemented
along the boundary of the site as it meets with the southernmost curtilage of No. 2
Blain Terrace shall be submitted to and approved in writing by the Planning Authority. 
Such details shall identify the provision of a fence (or similar means of boundary
treatment) that shall ensure there is no direct unobstructed line of sight between the
window on the south-facing elevation of No. 2 Blain Terrace and the windows of any

Page 13

habitable rooms on the north-facing elevations of the dwellinghouses on Plot Numbers
7 and 8. 
The screening measures shall be fully installed in accordance with the approved
details prior to the occupation of the subject dwellinghouses and shall be maintained in
a safe and tidy condition thereafter unless the prior written consent of the Planning
Authority is obtained for variation. 
Reason: In the interests of the privacy and amenity of the existing and proposed
dwellinghouses having regard to the relevant provisions of NPF4 and the Argyll and
Bute Local Development Plan 2 and its related Technical Notes. 
12. Installation of Air Source Heat Pump 
Prior to the installation of any air source heat pumps within the development site, full
details of their location and specification shall be submitted to and approved in writing
by the Planning Authority. The noise level from the operation of any air source heat
pumps that are installed must not exceed 42dB LAeq (5 min) at 1 metre from the
window of a habitable room on the façade of any neighbouring residential property. 
If, in the opinion of the Planning Authority, any air source heat pump results in a noise
nuisance to the occupant of any neighbouring dwelling, the Applicant shall install noise
mitigation measures in agreement with the Planning Authority. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
13. Waste Storage 
Prior to the occupation of the dwellings hereby approved, a detailed specification of the
containers to be used to store waste materials and recyclable materials produced by
the dwelling houses as well as specific details of the areas where such containers are
to be located shall be submitted to and approved in writing by the Planning Authority. 
Unless otherwise agreed in writing with the Planning Authority, the storage of waste
and recyclable materials shall be fully installed in accordance with the approved details
prior to the occupation of each dwellinghouse. 
Reason: In the interest of visual amenity; to ensure that there is adequate storage for
recycling of waste; and to protect the amenity of the immediate area by preventing the
creation of nuisance due to odours, insects, rodents or birds. 
14. Construction Management Plan 
Prior to the commencement of the development hereby approved, a Construction
Management Plan shall be submitted to and approved in writing by the Planning
Authority. The plan shall include the following: 
o Contact details for the contractor 
o The proposed route of construction traffic
o The turning areas and wheel washing areas
o The provision of appropriate signage
o The location of the site compound (if any) and the parking area for vehicles
belonging to site operatives and visitors

Page 14

o The location of the storage area (if any) for plant and materials used in the
construction the development 
o The method of working and the measures to be implemented to control the
emission of dust during construction. Such details shall be in accordance with the
methodology outlined in the IAQM guidance on the assessment of dust from
demolition and construction 2014 (version 1.1) 
o The location of the security fencing 
Thereafter, all works shall be carried out in accordance with the agreed Construction
Management Plan. 
Reason: In order to avoid sources of nuisance in the interests of amenity. 
INFORMATIVE NOTES 
1. The attention of the applicant/developer is drawn to the contents of the letter from
Scottish Water dated 17th April 2024, which is available for inspection on the Council’s
web site. 
With specific regard to Condition 8 above, it should be noted that Scottish Water have
stated that, other than in limited exceptional circumstances, they will not accept any
surface water connections into their combined sewer system for reasons of
sustainability and to protect existing customers from flooding. In order to depart from
this position on surface water connections, Scottish Water require significant
justification to be prepared and submitted by the applicant/developer. 
It will be for the developer and their engineers to submit their case to Scottish Water. If
this is found to be an unacceptable arrangement, an amended development may have
to be designed or a different surface water drainage system may have to be
formulated. The details of such a scheme will be expected to comply with SuDS and
will be considered by the Planning Authority’s Flood Risk Adviser as required. 
2. Those works to be undertaken on or adjacent to the public road will require a Road
Opening Permit (S56) in advance of being carried out and it will also be necessary for
positive drainage measures to be incorporated into the design of each individual
access to ensure that surface water drainage will not pass on to the footway or
carriageway. The applicant/developer is advised to contact Roads and Amenity
Services on 01546 605514 or to use the following link to the Council's website:
https://www.argyll-bute.gov.uk/licences/road-opening-permit 
(Reference: Report by Head of Development and Economic Growth dated 30 August
2024, submitted) 
Councillor Philand returned to the meeting. 
8. MS LIZ MAXWELL: DEMOLITON OF EXISTING DWELLINGHOUSE AND
ERECTION OF REPLACEMENT DWELLINGHOUSE AND ASSOCIATED
WORKS: COMRAICH, MANNAL, ISLE OF TIREE (REF: 24/01153/PP) 
The Area Team Leader spoke to the terms of the report.  In terms of the Settlement
Strategy set out in the adopted LDP2, the site is identified as being within the defined
Settlement Area of Balemartine on the proposals maps where LDP2 Policy 01 states that
development will normally be acceptable subject to a number of criteria.

Page 15

The proposal is seeking to secure planning permission for the demolition of the existing
dwellinghouse, ‘Comraich’ to allow for the redevelopment of the site with a purpose built
dwellinghouse. 
The proposal has elicited 25 objections and 14 expressions of support.  The main thrust of
objection relates to the scale, design and finishes of the proposed development. 
It is the opinion of Planning Officers that the design proposed for the replacement
dwellinghouse pays appropriate regard to the characteristics of the area and the proposal
is considered to accord with the provisions of the current Development Plan and with
national planning policy. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 19/06/24, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location
Plan 
CH1087 – AECO – XX – ZZ – DR
– A – 2000
05 20/06/24
Site Plan
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2001
07 20/06/24 
Site Plan
as Existing 
CH1087 – AECO – XX – ZZ – DR
– A – 2002
05  20/06/24 
Floor Plans
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2004
07 20/06/24 
Elevations
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2005 
02  20/06/24
Street
Elevation
CH1087 – AECO – XX – ZZ – DR
– A – 2006 
03  20/06/24

Page 16

as
Proposed 
Sections as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2007
02  20/06/24 
Design
Statement
– 10 Pages 
20/06/24 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. PP – Sustainable Drainage System 
Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition.  The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
4. PP – Submission of Sample Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
samples of the proposed roofing materials to be used in the proposed development
have been submitted to and approved in writing by the Planning Authority. The
development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
5. PP - Electric Vehicle Charging – Residential with off street parking 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in

Page 17

writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed.  
The approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
6. PP – Biodiversity Statement 
No development shall commence until a biodiversity statement demonstrating how the
proposal will contribute to conservation/restoration/enhancement of biodiversity, and
how these benefits will be maintained for the lifetime of the development has been
submitted and agreed in writing with the Planning Authority. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3. 
(Reference: Report by Head of Development and Economic Growth dated 4 September
2024, submitted) 
9. CLAN CAMPBELL (WHISKY) LTD: PROPOSAL OF APPLICATION NOTICE
FOR WHISKY DISTILLERY, DUNNAGE WAREHOUSE, VISITOR
EXPERIENCE AND ASSOCIATED INFRASTRUCTURE: INVERARAY
CASTLE ESTATE, INVERARAY (REF: 24/01438/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed site is located
partly within and partly adjacent to a listed walled garden, first constructed between 1752
and 1755, all set within the historic designated garden and designed landscape of
Inveraray Castle.  In terms of the adopted Local Development Plan (LDP2), the site is
located within the designated Countryside Area. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission.

Page 18

Decision 
The Committee noted the content of the report and requested that the following matters be
given consideration in finalising any future planning application submission – 
• The Committee welcomed the economic benefit to the area; 
• The Committee asked that consideration be given to using the existing access to the
south of the estate as it had good visibility splays at that location; and 
• The Committee asked that consideration be given to the Applicant supporting the
upkeep and maintenance of the Inveraray-Dalmally road. 
(Reference: Report by Head of Development and Economic Growth dated 30 August
2024, submitted) 
10. DEVELOPMENT MANAGEMENT SERVICE PLAN 2024 - 2026 
A report seeking the endorsement of the Development Management Service 2024 – 2026
attached as Appendix A was considered. 
The Service Plan provides an overview of the Development Management Service and its
main duties and seeks to outline how the Service can operate to underpin the corporate
objectives of the Council. 
Decision 
The Committee agreed to approve and endorse the Development Management Services
Plan 2024 – 2026 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Development Management Service Plan
2024 – 2026, submitted) 
11. DEVELOPMENT MANAGEMENT CHARTER 2024 
A report seeking the endorsement of the Development Management Charter attached as
Appendix A was considered. 
The Development Charter is intended to inform customer expectations by providing an
overview of the Development Management Service, the Development Management
Process, and to set out the standard of service that customers should expect in terms of
both performance and the manner in which a service is provided. 
Decision 
The Committee agreed to approve and endorse the Development Management Charter
2024 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Development Management Charter
2024, submitted)

Page 19

12. UPDATED PLANNING ENFORCEMENT AND MONITORING CHARTER
2024 
A report seeking the endorsement of an updated Argyll and Bute Enforcement and
Monitoring Charter contained at Appendix A was considered. 
Enforcement Charters should be reviewed every 2 years and they must outline what
service is provided to customers and complainants in relation to breaches and alleged
breaches of planning control. 
Decision 
The Committee agreed to approve and endorse the updated Enforcement and Monitoring
Charter 2024 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Planning Enforcement and Monitoring
Charter 2024, submitted) 
The Chair ruled, and the Committee agreed, to take a short comfort break at this point. 
The Committee reconvened at 12.35 pm with all those present as per the sederunt with
the exception of Councillor Liz McCabe. 
13. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISION 
A report summarising a recent decision by Scottish Ministers following an appeal in
respect of planning application reference 21/01583/PP, was before the Committee for
information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted) 
14. UPDATE ON RECENT SCOTTISH MINISTERS SECTION 37 DECISION 
A report summarising the decision made by Scottish Ministers to approve Section 37
consent and deemed planning permission in respect of the proposed 275KV Transmission
line from Dalmally to Creag Dhubh, was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 5 September
2024, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following 2 items of business on the
grounds that they were likely to involve the disclosure of exempt information as defined in

Page 20

Paragraph 13 respectively of Part 1 of Schedule 7A to the Local Government (Scotland)
Act 1973. 
Councillor Graham Hardie, having declared an interest in the following item, left the
meeting at this point. 
15. ENFORCEMENT REPORT - REFERENCE 15/00051/ENAMEN 
The Committee considered enforcement case reference 15/00051/ENAMEN. 
Decision 
The Committee agreed to continue consideration of this case for a period of 6 months to
allow Planning Officers to make further investigations and consult with other agencies. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted) 
Councillor Hardie returned to the meeting. 
16. REQUEST FOR A TREE PRESERVATION ORDER 
The Committee considered a request for a Tree Preservation Order. 
Decision 
The Committee agreed the recommendations detailed in the report. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted)