Democracy Spraffa

8. Dir App - Beith Trust March 2026 Cabinet CIF report and Appendix 1 - Final - 19.02.26.docx

North Ayrshire Council · 17 March 2026
Back to Cabinet — 17 March 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC INFORMATION
PUBLIC INFORMATION   
NORTH AYRSHIRE COUNCIL 
17 March 2026 
Cabinet (Education) 
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the application from Garnock Valley
Locality Partnership in line with CIF criteria; and
b) Approves the CIF application in relation to
Beith Trust (see Appendix 1). 
1. Executive Summary 
1.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for
the creation of an innovative fund to enable communities to address the priorities
they have identified through Local Planning Partnerships and within the context
of North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. In June 2021, Cabinet approved
a further £1m top-up for the funding, with a further £2m added in November
2021. 
1.2 Locality Partnerships have subsequently continued to work on their local action
plans and refining proposals for expenditure in line with their locally identified
needs. It is a testament to the dedication of the Locality Partnerships and their
community partners that proposals continue to emerge to provide creative
approaches to addressing local challenges. 
1.3 This report brings forward proposals which respond to the specific needs of the
local community, and which have been developed based on local circumstances
and opportunities.
2. Background 
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for
the creation of an innovative fund to enable communities to address the priorities
they have identified through Locality Planning Partnerships and within the context
of North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. A further £3m was added to the
funding in 2021. A summary of the current position on disbursement of CIF
monies is summarised in the table below:

Page 2

PUBLIC INFORMATION
PUBLIC INFORMATION 
2.2 It was agreed that the CIF awards would range between £5,000 and
£100,000 for community organisations, as defined in the CIF guidance, in
order to support proposals and projects that connect with: 
• The North Ayrshire Local Outcomes Improvement Plan overarching aim
of North Ayrshire: Fair for All, with consideration for how applications
contribute to community support for the cost-of-living crisis;
• The Community Planning Partnership and locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Sustainable North Ayrshire
Strategies 
And will also: 
• Fulfil a compelling need and not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number
of people possible;
• Exhibit project and/or organisational innovation in their approaches to their
work in their way of addressing community challenges and in their request
to Locality Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide
financial statements upon requests) and efficiently and effectively
managed. This can include an organisation to be created to deliver
the project;
• Include options or potential for NAC and CPP employee
engagement and volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a
regular basis. 
2.3  The proposal development and application process has been agreed as
follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
Locality Value of
CIF from
first funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total balance
available
Irvine £754,000 £1,046,010 £290,000 £580,000 £577,990
Kilwinning £286,000 £438,060 £120,000 £240,000 £207,940
Three
Towns
£598,000 £1,314,079  £240,000 £480,000 £3,921
Garnock
Valley
£390,000 £521,103.04 £150,000 £300,000 £318,896.96
North Coast £468,000 £935,761 £170,000 £340,000 £42,239
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £4,380,092.04 £1,000,000 £2,000,000 £1,219, 907.96

Page 3

PUBLIC INFORMATION
PUBLIC INFORMATION
access the applications, make links, and look at the funding ‘in the round’.
• If the partnership supports a bid, then the group will be encouraged to submit
a full application form, which they will decide upon before making a proposal
to Cabinet for final approval.
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed application at Appendix 1 has been developed by community
partners and North Ayrshire Council officers and are now recommended for
approval by Cabinet. The application is summarised below. 
2.5 The Garnock Valley Locality Partnership 
The allocation and funds committed to date are outlined in the table below. 
The Garnock Valley Locality Partnership CIF allocation to
date: 
£840,000
Garnock Valley Mens Shed - Project Initiation £28,000 
Travel Needs Analysis   £25,000 
Geilsland Hall - Volunteering and Employability   £45,000 
Garnock Valley 20:20 Vision  £15,000 
Beith Community Development Trust - YOUth Lead  £43,500 
Garnock Valley Mens Shed - Heating System Replacement   £20,000 
Café Solace - Development Worker   £49,723 
Geilsland Courtyard Feasibility Study   £15,582 
Beith Playpark   £100,000 
Beith Community Association  £22,098.04
Garnock Valley 2023 Development Worker  £51,200
Beith Hive  £41,000
Radio City Association  £65,000 
Balance  £318,896.96 
2.6 Proposal: Beith Trust (£80,000) (See Appendix 1)
2.6.1  Beith Trust is a registered Scottish charity and company limited by guarantee, based
in Beith, North Ayrshire. Established in 2012, it was created to support a community
led, asset-based approach to local regeneration. The organisation works to improve
both the current circumstances and prospects of the community by advocating on its
behalf and creating opportunities for growth, development and positive change. Its
community activity programme provides pathways for social, recreational, learning
and employability progression, alongside a programme of seasonal and cultural
events. Beith Trust also supports volunteers who deliver key community services
addressing issues such as social isolation, loneliness, poverty, and challenging life
circumstances. These services include befriending support and food distribution
systems across the Garnock Valley. 
2.6.2 Beith Astro is a key multi use community hub within the Garnock Valley, providing
significant social, educational and wellbeing benefits beyond its core sporting
function. During term time, the facility supports outdoor learning, nature-based play
and wraparound childcare for local schools and groups, while school holiday

Page 4

PUBLIC INFORMATION
PUBLIC INFORMATION
programmes offer popular activity camps with leadership and volunteering pathways
that support progression into employability. Adjacent green and growing spaces are
extensively used for family activities, therapeutic programmes and community food
initiatives promoting climate aware behaviours. Football remains the primary activity
anchoring the site’s identity, enabling a wider programme of community
development, learning and wellbeing delivered by Beith Trust.
2.6.3 Beith Trust is seeking funding to upgrade the full size 3G pitch at Beith Astro,
situated at the Meadowside Pavilions in Beith. After more than a decade of intensive
use, the pitch surface has surpassed its operational lifespan, resulting in compacted
infill and reduced playability that now jeopardise the safe operation of this well used
community asset. The refurbishment represents Phase 1 of a wider programme to
modernise the Astro Pavilion, pitch and surrounding grounds to meet contemporary
community needs. Works will include installation of a new shockpad, replacement
with a FIFA compliant 3G surface, and independent post installation testing to verify
safety and performance standards. 
2.6.4 The overall funding package will be assembled through multiple funders over a
phased two-year period, and this application seeks a Community Investment Fund
contribution to act as match funding for a £255,000 bid to the Scottish FA’s “Pitching
In” programme. The project supports Garnock Valley Locality Partnership priorities
through the preservation of a key community facility and enhancing wellbeing,
amenities, youth opportunities and community development across the locality. It
also supports the Community Planning Partnerships’ priority of wellbeing by
providing access to physical activity for communities. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the application from Garnock Valley Locality Partnership in line
with CIF criteria; and
b) Approves the CIF application in relation to Beith Trust (see
Appendix 1). 
4. Implications/Socio-economic Duty 
Financial 
4.1 CIF funding is allocated from within existing resources. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community

Page 5

PUBLIC INFORMATION
PUBLIC INFORMATION
cohesion and advance community empowerment.  Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with climate change and carbon reduction
opportunities are considered in relation to each CIF application.   
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims. 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• We will have active, inclusive, and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building: 
• Financial Power: Listening to communities and local enterprises to maximise the
impact of financial investment and grow local business, enhance innovation and
empower communities.
• Land and Assets: Maximising the function and ownership of local physical assets for
the benefit of communities and enterprises. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 The proposals support the rights of children and young people through offering better
access to facilities, in particular supporting the right to play and the right to be part of
their community. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The proposals contained within this report have been developed by the Locality
Partnerships, through consultation with local people, including young people. 
David W. Hammond
Executive Director (Communities & Housing)

Page 6

PUBLIC INFORMATION
PUBLIC INFORMATION 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1: CIF Application Beith Trust

Page 7

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
The CIF will support proposals and projects that: 
• Connect with:
o the Community Planning Partnership (CPP) and Locality priorities; and 
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities;
• Provide long-term, sustainable, positive results for the greatest number of people
possible;
• Exhibit project and/or organisational innovation in their approaches to their work in their
way of addressing community challenges and in their request to Locality Partnerships
and the Council;
• Come from (an) organisation(s) that is financially viable (can provide financial
statements upon request) and efficiently and effectively managed. This can include an
organisation to be created to deliver the project;
• Include options or potential for NAC and CPP employee engagement and volunteering
where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities, and stimulate interest in the
CIF.  The Locality Partnership will then strategically assess the applications, make
links and look at the funding ‘in the round’. 
• If the partnership supports a bid then the group will be encouraged to submit a full
application form (attached), which they will decide upon before making a proposal to
Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Christina Pieraccini
Locality Officer - Garnock Valley
Connected Communities
North Ayrshire Council
Walker Hall
45, Main Street
Kilbirnie
KA25 7BX 
Tel: 01505 680203
Mob: 07966 160854
Email: cpieraccini@north-ayrshire.gov.uk 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf

Page 8

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
1. Details of your organisation 
Name of Organisation 
Beith Community Development Trust 
Postal Address for Correspondence 
Name of Contact Person Jane Lamont 
Position in Organisation CEO 
Telephone Number Click or tap here to enter text. 
Email Address Click or tap here to enter text. 
Total amount of funding requested:  £80000
Match funding (if any): £ 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided
and how long it has been in existence. 
Beith Trust is a registered Scottish Charity and company limited by guarantee based
in Beith, North Ayrshire, we were established in 2012 as a mechanism to drive forward
a community led, asset based approach to the regeneration of our community.
We aim to improve the present condition and the future prospects of our community
by advocating for our community, facilitating opportunities for change, growth and
development of the inherent potential of people and places.
We operate a diverse programme of activity and services in and around the Garnock
Valley, mainly focused around our facilities at Beith Astro and Geilsland but also in the
wider communities of the Garnock Valley, we work in partnership with a number of
public, private and third sector groups, clubs and agencies.   We manage and operate
a number of facilities which generate opportunities for training, volunteering,
leadership, employment and enterprise.  Any profits are reinvested in enterprise
development or subsidise our community services

Page 9

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Beith Trust work is centred on creating new conditions that enable and support the
people and places of Beith to flourish and thrive.  Our work aims to create those
conditions.  
Our community activity programme aims to create a pathway of support and
progression within social, recreational, learning and employability opportunities.  We
deliver a programme of seasonal & cultural events and festivals.
We support volunteers to facilitate valuable community services that offer support to
families and individuals affected by challenging life circumstances and poverty such
as befriending, social isolation and loneliness and food distribution systems in the
Garnock Valley. 
3. Title and summary of proposal 
Beith Trust is seeking a contribution towards upgrading the pitches at Beith Astro to safeguard
a much-loved, heavily used community hub at Meadowside Pavilions in Beith.  This is part of
a larger initiative which will see the Astro Pavilion building, pitch and grounds repositioned to
reflect the needs of 21s century community and customers. 
After more than a decade of continuous use, the full-size 3G surface has exceeded its
expected lifespan. Compacted infill and reduced playability now threaten the ongoing
availability of this heavily used community facility. Resurfacing is therefore essential to keep
this critical local asset open, safe and fit for purpose. 
The refurbishment scope reflects this need and will include installation of a new shockpad,
laying a new FIFA-compliant 3G surface, and post-install testing by an accredited test house
to confirm performance and safety. 
The full funding package will draw on a range of funders, all of whom have been approached
and consulted as part of project development. We expect the final package to include a mix of
confirmed and pending contributions, and it is also likely that additional funders not yet
identified will support the project as opportunities arise during the delivery period. Funding will
be secured on a phased basis over the two-year project timeline to align with key procurement
and delivery milestones. 
This application relates directly to Phase 1 of the project: the refurbishment of the full-size 3G
pitch. The CIF contribution will provide match funding towards our SFA “Pitching In”
application, with a total request of £255,000.
Beith Astro is more than a pitch.  During term time it supports nature & play, outdoor learning
and wraparound childcare used by multiple groups and local schools, in school holidays it
hosts popular holiday camps on the pitch, which double as leadership and volunteer pathways
for employability participants before stepping into real roles at sessions and events.  Adjacent

Page 10

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
to the pavilions, families, individuals and groups actively use gardens and growing and green
space for outdoor play, wellbeing and therapeutic programmes; on-site growing projects
involve children and volunteers in food cultivation, composting and climate-aware habits that
link to community food initiatives. 
Football, however, is the anchor that makes the whole venue viable. Beith Astro is booked to
capacity at weekends and most evenings, delivering 40+ hours of club matches and training
across the week and serving 1,000+ weekly users through clubs, schools, programmes and
casual bookings. 
Regular club demand (Beith Juniors, Beith Community FC and partners) fills peak hours;
protecting those hours with a new, compliant surface secures the trading income that
subsidises wider community use.   Bookings are managed via online booking apps, recently
funded access controls will be installed providing trusted key holders to keep evenings and
weekends running smoothly. 
The football pathway also powers community engagement and workforce: holiday camps and
social and recreational activity builds volunteering and leadership, creating progression routes
for local young people into paid or volunteer roles at the venue. 
The site operates as a wider community hub—with family support services, outdoor play and
on-site growing—families who come for football also access nature-based activities, food
growing and wellbeing projects, reinforcing year-round footfall and use of the place. 
Investment in the pitch is therefore not just a sports upgrade—it’s the keystone that safeguards
bookings, protects an income-generating community asset for future development, and
sustains the broader social programme delivered from the venue. 
4. What difference will this project make within the locality and to local
services and programmes? 
Please include:

Page 11

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 1. Moving
Around (Public Transport, Traffic and Parking) 2. Work and Local Community
3. Facilities and Amenities 
Resurfacing Beith Astro’s full-size 3G pitch will protect a heavily used community
asset that underpins a wide range of local services and programmes. By replacing
an end-of-life surface with a new FIFA-compliant pitch, the project will improve
safety, protect continuity of provision, and sustain participation for clubs, schools and
community programmes that rely on the facility week in, week out. 
Outcomes we aim to achieve 
• Keep a critical local facility open, safe and reliable by renewing and upgrading
the pitch surface to current standards 
• Protect and grow participation in sport and physical activity for children, young
people and adults by safeguarding a facility that is already in high demand 
• Strengthen community wellbeing and community connection by maintaining
affordable, local access to structured and informal activity that supports
mental health, confidence and social inclusion. 
• Support youth development, volunteering and employability pathways through
coaching, leadership, social and recreational activity and venue operations
linked to ongoing social and community programmes. 
How we will approach reducing inequality 
• Affordable access: protect and prioritise community pricing and targeted / free
or subsidised access where cost could be a barrier (particularly for children
and young people). 
• Local access: maintaining a local, high-quality facility reduces the need (and
cost) of travelling out of the locality to participate. 
• Progression routes: build skills and confidence through volunteering and
leadership opportunities that provide meaningful progression

Page 12

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Project Outcomes and Deliverables with Locality Partnership Priorities     
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as
well as the range of people. 
Who we engaged
with
How engagement happened Scale / evidence of
engagement
Locality priority What we will do (through the pitch
refurbishment)
Difference / outcomes in the
locality
1. Moving
Around
(Public
Transport,
Traffic and
Parking)
Keep year-round access to a local
facility so people can participate closer
to home  and promote active travel for
local users where possible. 
Reduced need for families and
teams to travel out of the area;
supports healthier, more active
local journeys. 
2. Work and
Local
Community
Protect a community facility that
enables year-round clubs, camps and
programmes, and strengthen Beith
Trust’s employability links by providing
volunteering, training and progression
opportunities into coaching, session
delivery and facility operations. 
More local routes into skills,
training and work experience
(especially for young people
and those facing barriers),
stronger community
connection through shared
activity, and greater resilience
for local clubs 
3. Facilities
and
Amenities 
Renew an end-of-life pitch by installing
a new shockpad and FIFA-compliant
3G surface, with accredited post-install
testing, bringing a dated facility up to
current safety and performance
standards and securing long-term safe,
high-quality use for the community. 
Safeguards a key community
amenity well used by clubs,
schools and community
groups; improves safety and
quality; sustains high levels of
local participation and
programme delivery.

Page 13

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Regular pitch users
(clubs, schools,
community
programmes, casual
users)
Continuous engagement through
day-to-day operation, bookings, and
programme planning. This project
has been developed directly in
response to the condition risks facing
a pitch that is already in constant use.
The pitch supports clubs,
schools, community
programmes and casual
bookings with footfall from
600- 1000 individual’s
weekly
Football clubs and
partner teams
Ongoing operational dialogue and
shared responsibility for delivery and
activity 
Weekly programme
includes Beith Juniors FC,
Beith Juniors Community
FC, other local teams and
teams from adjacent
areas.
Schools, families,
children and young
people
Regular school-time use via Beith
Primary nuture groups and early
years engagement (nature / outdoor
learning), plus holiday activity
delivered from the site (holiday
camps, leadership and volunteering
pathways).
Existing programme and
user includes partners and
Beith Trust groups  
Underrepresented
and inclusion-
focused groups
Targeted and supported use through
Beith Trust programmes and
partners (e.g., neuro-diverse users,
wellbeing activity, family work this will
incorporate free/subsidised access
where needed. 
Registers of activity,
feedback and surveys with
existing user groups with
weekly access.  
Wider community /
locality voice
This proposal also reflects what local
communities say they need in terms
of protecting and improving local
facilities. The Garnock Valley Local
Place Plan engagement gathered
views through surveys, events and
schools sessions.
Local Place Plan
engagement included 750
survey responses, 200
people at 6 town & village
events, 50 pupils from 8
schools, and 500 e-
bulletin signups. 
Key stakeholders
and funders
Funders have been approached and
consulted as part of project
development and the phased funding
package.
We will be approaching partners in
relation to programme activity in the
new year 
Our pre project
engagement includes
approaches / consultation
with multiple funders (e.g.,
SportScotland, Aria Fund,
CARES, SFA, Big Lottery
etc). 
6. How will the project be managed?

Page 14

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment opportunities
in the Garnock Valley? Please include the number of volunteering opportunities and
employment opportunities
• If there are any staff requirements, please outline your HR plans 
Governance and day-to-day management
• Overall accountability: Beith Trust is governed by a voluntary Board with
responsibility for strategic oversight, legal compliance and financial
accountability. 
• Operational leadership: The Board delegates day-to-day responsibility to the
CEO and senior management team (including finance and project delivery) with
regular reporting to the Board through scheduled meetings and annual
reporting. 
• Facility management: Beith Astro is managed by Beith Trust staff and
volunteers, operating seven days a week. 
Day-to-day oversight of the venue includes the Business Support / facilities team
who manage maintenance, H&S compliance, and bookings coordination. 
• Operational systems: Bookings are managed through Skedda and access
controls enable key holding to be shared with local clubs, while Beith Trust
retains caretaking, weekday and financial oversight to ensure the facility is safe,
welcoming and well managed. 
How the finances will be managed?
• Project finances are managed through Beith Trust’s existing governance and
finance arrangements, with Board financial accountability and management
oversight via the CEO. 
• Day-to-day processing (invoicing, claims, reporting and compliance) is
supported by Beith Trust’s administrative and finance staff, with regular internal
monitoring to ensure spend matches the agreed project scope and funder
requirements. 
Volunteering and employment opportunities in the Garnock Valley

Page 15

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
The project will sustain and strengthen local employment and volunteering linked to
Beith Astro and Beith Trust’s wider programmes:
Employment (existing roles sustained through the facility being operational):
• Beith Trust employs 16 staff across the organisation. 
• Beith Astro’s current staffing includes 2 part-time posts (Business Support
Assistant and Facilities Officer), and 2 part-time/casual Facilities Assistant
posts 
Volunteering (opportunities enabled and expanded):
• Beith Trust is supported by 80+ active volunteers across the organisation. 
• Beith Astro has 15+ volunteer roles supporting maintenance, gardening and
activity/event delivery. 
• Holiday camps at Beith Astro embed employability opportunities for individuals
through Beith Trust’s employability programme, with progression into ongoing
volunteering roles at the venue. 
HR plans (staffing requirements)
• The project will be delivered using the existing staffing structure, with rotas
flexed around demand (including evening/weekend cover). 
• Staff and volunteers receive ongoing training and support; this includes
disability awareness and inclusive customer service, and we review provision
regularly to meet user needs. 
• If additional short-term operational cover is required during key delivery
milestones (e.g., reopening/commissioning period), we will recruit locally using
safe recruitment, induction and role-appropriate training, to maintain service
quality and safeguard users. 
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have
had over the past 5 years, both financially and “in kind”.

Page 16

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP 
We are requesting £80,000 from North Ayrshire Council’s Community Investment
Fund, as a contribution to Phase 1 Beith Astro renovation programme – in particular
the 3G pitch refurbishment (resurfacing with shockpad and FIFA-compliant 3G, plus
accredited post-install testing). 
This request is intended to unlock and strengthen the wider match-funding package
for the pitch works, particularly our proposal to the Scottish FA ‘Pitching in’
application, which requires evidenced partner funding. 
Wider funding package for the overall project (context)
The pitch refurbishment sits within a broader two-three year phased programme and
the overall funding package is being assembled from multiple funders who have been
approached/consulted as part of project development. 
Anticipated funding package 
Funder / source Amount Purpose Status
NAC CIF 
(kick-start investment ) £80,000 Contribution - full-size 3G pitch
refurbishment (this application) Requested
Aria Fund £10,000 Access controls and security
installation Secured 
Sport Scotland
(Facilities Fund) c£150,000 Pavilion upgrade In development 
CARES( energy retro fit
)  c.£50,000 Pavilion upgrade EOI submitted 
Scottish FA (Pitch
Refurb) c.£250,000 Pitch refurbishment Application in
progress 
Other funding support in the past 5 years (financial and “in kind”)
Other funding support in the past 5 years (financial and “in kind”) is evidenced through
Beith Trust’s audited annual accounts, which record our income from grants, trading
and other sources over this period. Alongside cash funding, Beith Trust benefits from
significant in-kind support through volunteering, with 40+ active volunteers supporting
facilities, events, youth work and governance. 
Amount of funding requested (£) 80000

Page 17

COMMUNITY INVESTMENT FUND 
GARNOCK VALLEY LOCALITY PARTNERSHIP
Please give a breakdown of cost and recent quotations where appropriate. 
Item Cost  Quotation Supplied (Y/N)
Floodlights ( Bellsdale)  100000 N
Access Control system  10000 N
Pitch Upgrade 260000 Y 
Please give a breakdown of details of match funding (if any) 
Funder Amount Funding Secured (Y/N)
Partner Contribution
(Floodlights) 
100000 Y
Aria   10000 Y
SFA Pitching in Fund  180000 N 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in place. 
Beith Trust will employ a suitably qualified pitch consultant who will oversee and
monitor the installation in relation to cost and quality, from procurement to installation. 
Moreover, Beith Trusts existing monitoring and evaluation system (Upshot), is a digital
tool designed to effectively track project performance. Beith Trust finance system will
enable transparent financial planning 
These systems will provide us with a clear of tangible results.   This includes
completing the CIF monitoring form and feedback to the Locality Partnership.  These
evaluations will focus on the project's alignment with Locality Priorities and the Our
Garnock Valley Local Place Plan.
This comprehensive approach ensures the project's financial sustainability, promotes
local employment and volunteerism, aligns with the Locality Partnership priorities,
and incorporates robust monitoring and evaluation processes to support a stronger,
more inclusive community in the Garnock Valley.