NORTH AYRSHIRE COUNCIL
2 December 2025 
Cabinet 
Title: Pride in Place Programme 
Purpose: To update Cabinet on the Pride in Place Programme funding
awards in North Ayrshire and to seek approval to develop both
programmes in line with UK Government requirements. 
Recommendation: That Cabinet:
a) Notes and approves the acceptance of the £20m Pride in
Place Programme funding allocation.
b) Notes the request for and approves the submission of the
proposed ‘Neighbourhood’ and associated evidence to UK
Government to support selection.
c) Notes and approves the acceptance of the £1.5m Pride in
Place Impact Fund allocation
d) Agrees the proposed approach to the allocation of the Pride
in Place Impact Fund allocation.
e) Agrees to receive a further report in due course detailing
proposed expenditure arrangements for the Pride in Place
Impact Fund allocation informed by the confirmation of the
successful Pride in Place Programme ‘Neighbourhood’. 
1. Executive Summary 
1.1 In September 2023, the UK Government announced that 55 towns across the UK would
benefit from up to £20 million of investment through endowment style funding over a
10-year period. Irvine was identified as one of the original seven towns in Scotland to
benefit from this funding. 
1.2 The programme was renamed and expanded as the ‘Pride in Place Programme’ in
September 2025, to a further 169 of the most-in-need neighbourhoods across the
United Kingdom, including a further 14 in Scotland. The funding will be focused on those
areas which are “doubly disadvantaged” by high levels of deprivation and weak social
infrastructure, a local programme, focused on neighbourhoods with populations
between 5,000 and 15,000. 
1.3 Further to the original Irvine award, North Ayrshire has now received an additional £20m
allocation through the new Pride in Place Programme (PiPP). Specific neighbourhoods
in Scotland however have not yet been announced, with a UK Government decision
expected by the end of 2025.

Page 2

1.4 Alongside PiPP is the new Pride in Place Impact Fund (PiPIF) which will see £1.5m of
capital funding over two years being invested across North Ayrshire, alongside 94 other
places across the UK. The fund aims to support the development of shared community
spaces, revitalise local high streets and improve public spaces. The programme will be
locally led and will support improvements that reflect the pride and potential of each
place. 
2. Background 
Pride In Place Programme
2.1 The UK Government’s Pride in Place Programme (PiPP) was published on 25
September 2025, building upon the previous ‘Plan for Neighbourhoods’ programme
currently being delivered in Irvine and selected areas across the UK. PiPP is a UK-wide
programme providing a 10-year investment to disadvantaged neighbourhoods. This
new phase of PiPP builds on the existing programme which is providing 75 towns across
the UK with up to £20 million each, totalling £1.5 billion over 10 years. The programme
aims to build strong, resilient and integrated communities, with this phase providing
additional 169 neighbourhoods across Great Britain with £20 million over 10 years. 
2.2 Specific neighbourhoods in Scotland have yet to be defined. UK Government has
provided a ranked list of intermediate zones (IZ) using data from the Scottish
Community Needs Index (SCNI) and Scottish Index of Multiple Deprivation (SIMD), in
order of most in need areas in North Ayrshire. The SCNI rank and the SIMD ranks have
been combined using a 75:25 weighted average to form a combined index for each
2011 IZ. A summary of this UK Government assessment is provided at Appendix One. 
2.3 Local Authorities have been asked to complete and submit questionnaires to the
Ministry for Housing Communities and Local Government (MHCLG) by 14 November
2025, to inform the identification of the successful neighbourhood. The selection criteria
identified are that the proposed neighbourhood should: 
• Be a contiguous area.
• Not be located in a UK Parliamentary Constituency with a Phase 1 Neighbourhood.
• Contain no less than 5,000 people, unless there is strong qualitative or quantitative
data for a lower population.
• Contain no more than 15,000 people, unless there is strong qualitative or
quantitative data for a higher population.
• Contain one or more Intermediate Zones in the top 20% of need using the
methodology outlined at Section 2.2, unless there is strong qualitative or
quantitative data for consideration of IZ in the up to 33% of need.
• Include other lower need IZ to connect high need IZ where necessary.
2.4 The questionnaire, map of intermediate zones and letter from the Secretary of State for
Scotland were also issued to the MPs and the Scottish Community Alliance to seek their
input. This information has also been shared by the Scottish Community Alliance with
local Development Trust Association Scotland (DTAS) members. DTAS has
encouraged its members to submit a completed questionnaire or engage with Elected
Members. Therefore, local submissions may have been made to UK Government
directly. Furthermore, the methodology for the final assessment has not been confirmed.
2.5 The questionnaire comprises a series of questions on the local context to illustrate
where funding could have most impact and the proposed boundary based on the IZ

Page 3

assessment, to inform the UK Government’s selection. The submission proposed for
North Ayrshire, informed by the data shared and wider assessment aims to address the
requirements of the programme and focus on the greatest areas of need. It was agreed
with UK Government that these would be submitted as “subject to Cabinet approval” by
the 14 November deadline. 
2.6 Informed by an analysis of the UK Government assessment, local socio-economic data
and other relevant qualitative information, the proposed contiguous area is within the
Three Towns comprised of the Stevenston Hayocks, Stevenston Ardeer (partial),
Stevenston North West, Saltcoats Central and Ardrossan Central IZ. This is illustrated
at Appendix Two. This proposal was informed by cross Service engagement and initial
engagement with the MP for North Ayrshire & Arran.  This aligns with the priority areas
identified through the Collaboration for Health Equity in Scotland and Fairer Futures
Partnership. The proposal: 
• Includes five high need IZ, as defined by the UK Government’s methodology and a
total population of 14,641.
• Is informed by 57.7% of the population within the Three Towns living within the most
deprived SIMD quintile.
• Is informed by the significant level of socio-economic challenges experienced within
the five IZ including high unemployment rates, low performance on multiple health
indicators and percentage of children living in poverty and with developmental
concerns at 27 to 30 months assessment.
• Notes the alignment of the Three Towns Locality Priorities to the Fund.
2.7 The PiPP follows the previous Plan for Neighbourhoods programme with around 37%
of the funding to be revenue supporting the delivery and management of the projects.
The new funding can only be directed at areas which were not supported in Phase 1. It
will also follow the same fund objectives as Plan for Neighbourhoods to: 
• Build stronger communities – All places should have strong relationships and a
collective sense of belonging to their community. This helps bring people together
to build community cohesion and resilience, helping people to feel proud of their
area and safe in their neighbourhood.
• Create thriving places – Every part of the UK deserves to have vibrant
neighbourhoods and communities with busy high streets, a good range of local
amenities and high-quality physical infrastructure.
• Empower people to take back control – Talent is spread equally but opportunity is
not. Everybody should be empowered and in control of their lives and have a say
over the future of their community.
2.8 An indicative timeline for the development of the Phase 2 PiPP Neighbourhood is
summarised as follows: 
• By 14 November 2025 local authorities to submit questionnaire returns to UK
Government for decision on neighbourhood areas.
• MHCLG decision and announcement of new neighbourhood by end of 2025
• Spring 2026: MHCLG issues capacity and capital funding payment to all places.17
July 2026: Neighbourhood Boards confirm finalised membership and any proposals
to alter the ‘default’ area boundary to MHCLG.
• Winter 2026: Neighbourhood Boards to submit Regeneration Plan to MHCLG for
assessment and approval.

Page 4

• Spring 2027: MHCLG approve Regeneration Plans and release first substantive
delivery funding payment.
2.9 A Neighbourhood Board is required to lead the creation of a local Regeneration Plan,
working with the Council to meet the programme goals. The Neighbourhood Board
should include residents, businesses, community groups, faith leaders, the local MP,
and others with strong ties to the area. Boards will set a long-term vision and plan,
exploring funding from public, private, and charitable sources. Each Board will have an
independent chair, appointed by the Council after consulting the MP, to lead and
represent the community. Boards must include the local MP and at least one ward
councillor. 
2.10 The Neighbourhood Board will decide where interventions happen and how funding is
used. In some cases, projects may extend beyond the programme’s boundary if they
clearly benefit local residents. Key considerations include that interventions: 
• Align with the programme’s aims;
• Have Board agreement and a clear reason;
• Benefit the original neighbourhood; and
• Involve a key asset used by local residents.
For example, improving a nearby high street or green space outside the boundary is
allowed if it reflects community priorities. Further guidance and confirmation of the
neighbourhood is anticipated from the UK Government by the end of the year. 
Pride In Place Impact Fund
2.11 The Pride in Place Impact Fund (PiPIF) was also announced on 25 September 2025,
with a prospectus published outlining the methodology, allocation and delivery
mechanism for the funding. North Ayrshire Council was directly awarded £1.5m of
capital funding to deliver on the PiPIF priorities. Funding will be released equally across
two financial years, with £0.75m to be received in 2025/26, and a further £0.75m in
2026/27. Given the timing of the funds being released, UK Government has confirmed
that funds to be received in 2025/26 can be carried forward. Full financial commitments
are required by the end of March 2027 with delivery to follow shortly thereafter if
required. 
2.12 The PiPIF aims to support three core objectives: 
• Community Spaces: investing in community facilities gives local people greater
control over the spaces that matter to them. Refurbishing or taking ownership of
underused but valued buildings.
• Public Spaces: enhancing public spaces e.g. playparks, streetscape, signage,
public art – encouraging people to spend time outdoors, build relationships and
take part in local activities.
• High Street and Town Centre Revitalisation: making town and city centres more
attractive and welcoming, attracting people and supporting local businesses and
economies.
2.13 Local Authorities are the accountable body for the funding and are required to work
closely with local stakeholders to identify and invest in interventions which meet local
need. Funding is to be managed within existing governance frameworks of local

Page 5

authorities, with oversight of the Section 95 Officer. Local authorities are also required
to engage with their local MP and stakeholders on how the fund is to be spent, ensuring
complementary activity across the local authority. 
2.14 The indicative timeline for delivery of the fund can be summarised as follows: 
• Winter 2025: Local Authorities to return signed Memorandum of Understanding to
MHCLG for release of initial £0.75m.
• February 2026: Local Authorities will be asked to return a progress summary; an
initial spend forecast across the three objectives for September 2025 to March 2026
and a forecast for the full PiPIF to March 2027.
• Financial reporting will then be required on a six-monthly basis to MHCLG from May
2026 to closure of the fund.
2.15 The strategic approach proposed for PiPIF would be to target areas in North Ayrshire
which have not benefitted from other Pride in Place Programme Funding. As the
additional PiPP neighbourhood is yet to be confirmed, the approach to geographic
allocation and the programme, would be the subject of a further report. 
2.16 The Regeneration Delivery Plan, alongside Locality Plans, Place Plans and Place
Frameworks would thereafter provide a useful starting point for project consideration to
inform discussions with Elected Ward Members, Locality Partnerships and Community
Stakeholders.
3. Proposals 
3.1 That Cabinet: 
a) Notes and approves the acceptance of the £20m Pride in Place Programme
funding allocation.
b) Notes  the  request  for  and  approves  the  submission  of  the  proposed
‘Neighbourhood’ and associated evidence to UK Government to support selection.
c) Notes and approves the acceptance of the £1.5m Pride in Place Impact Fund
allocation
d) Agrees the proposed approach to the allocation of the Pride in Place Impact Fund
allocation.
e) Agrees to receive a further report in due course detailing proposed expenditure
arrangements for the Pride in Place Impact Fund allocation informed by the
confirmation of the successful Pride in Place Programme ‘Neighbourhood’
4. Implications/Socio-economic Duty
Financial
4.1 Both PiPP and PiPIF note the intention to use the Financial Assistance power under
Section 50 of the UK Internal Market Act to fund areas directly whilst working with the
Scottish Government to determine the most appropriate delivery structure.
4.2 Capacity funding for PiPP will be released in Spring 2026. The initial £0.75m of funding
for PiPIF is to be released in November 2025. As noted, the PiPP will include around
37% of the funding to be revenue supporting the delivery and management of the
projects. PiPIF is a 100% capital fund.

Page 6

Human Resources 
4.3 Additional staff resource, in line with the Irvine Plan for Neighbourhoods Regeneration
Officer, will be required to support the delivery of the Fund and the development of a
Regeneration Plan. The cost of this will be met by the revenue funding outlined in the
initial prospectus. 
Legal 
4.4 The legal implications of both PiPP and PiPIF will be considered through its
development and Legal advice taken as necessary. Legal agreements will be
developed on a project-by-project basis as required with support from Legal Services.
Negotiation in relation to land and building acquisitions will be undertaken as necessary
with support from the Council’s Legal Services and Property Management and
Investment Service. Mechanisms such as Compulsory Purchase Orders will be
considered on a case-by-case basis, where considered appropriate. 
Equality/Socio-economic 
4.5 The methodology for the PiPP neighbourhood selection was determined by UK
Government and informed by the SCNI and SIMD. The programme aims to support
town centre regeneration and promote economic development. This methodology
considers metrics covering skills, pay, productivity and health alongside the Scottish
Index of Multiple Deprivation. This approach aims to ensure funding is directly awarded
to the areas which will benefit most. The development and implementation of the PiPIF
and PiPP will provide opportunities to: 
• Reverse economic, social and physical decline and reduce socio-economic
disadvantage within neighbourhoods;
• Tackle long term vacant and derelict land and buildings thereby reducing their levels
and impact on the community; and
• Build community wealth and tackle local deprivation through the regeneration of the
neighbourhoods by maximising the potential of land and assets.
An initial screening will be undertaken to establish if an Equality and Children’s Rights
Impact Assessment is required for individual programme elements on a case-by-case
basis. 
Climate Change and Carbon 
4.6 The development of both the PiPIF and the PiPP will enable the delivery of projects
aimed at revitalising the most ‘in-need’ neighbourhoods in North Ayrshire. This could
include promoting and improving active travel, reducing vacant and derelict land and
carbon reduction measures. This aligns with the priorities of the forthcoming
Sustainable North Ayrshire Strategy and the commitment to reduce carbon emissions
through declaration of a Climate Emergency. This will also contribute to the ambition to
achieve net zero by 2030.

Page 7

Key Priorities 
4.7 The development and implementation of the Pride in Place Programme will support all
four of the Council Plan’s priorities and strategic aims of: 
• Wellbeing: To transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
• Communities and Local Democracy: We will have active, inclusive and resilient
communities.
• Climate Change: To achieve net-zero by 2030.
• A Sustainable Council: A Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities.
Community Wealth Building 
4.8 The PiPP and PiPIF have the local community at the heart of their methodology. They
aim to ensure investment is targeted at local priorities and empower local communities
to contribute to the regeneration of neighbourhoods across North Ayrshire. A
Community Wealth Building approach will be adopted to the development of the
Regeneration Plan for the new neighbourhood, and in the delivery of the PiPIF, ensuring
it contributes across the pillars of: 
• Land and Assets: by supporting equitable land development and the development
of underutilised assets for community use.
• Procurement: through the inclusion of appropriate community benefit of local
supplier clauses within projects; and by considering phasing and programming of
projects to create local supply chain opportunities and support delivery by smaller
scale and local contractors where appropriate.
• Fair Employment: by supporting the creation of employment opportunities
particularly within the construction sector. Where North Ayrshire is procuring
services, through our enhanced Community Benefits approach we will seek to
ensure the creation of local training and work experience opportunities.
Consideration will also be given to delivery through employability programmes
where appropriate.
• Financial Power: by investing in neighbourhoods and leveraging additional external
investment.
Islands Communities Impact Assessment (ICIA) 
4.9 None. 
United Nations Rights of the Child (UNCRC) 
4.10 None. 
Consumer Duty 
4.11 None.

Page 8

5. Consultation 
5.1 Both programmes aim to ensure that local people are at the heart of decisions, through
direct membership of the new Neighbourhood Board and through the requirement for
engagement with stakeholders on where the PiPIF should be spent. Both programmes
will therefore be developed through co-production with the Neighbourhood Board and
extensive engagement with stakeholders. This approach will be informed by
engagement with Connected Communities. It will build on work to date, Locality
Partnership’s priorities, the Regeneration Delivery Plan and previous consultation
exercises. Updates will be provided to all Locality Partnerships on the PiPIF and to the
approved PIPP neighbourhood when agreed. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Claire Fitzsimmons, Senior Manager
Regeneration, on 01294 315305. 
Background Papers
Cabinet Report – Long-Term Plan for Towns, 5 December 2023
Council Report – Irvine Town Centre: Long-term Plan for Towns, 18 September 2024
Council Report – Irvine: Plan for Neighbourhoods, 14 May 2025

Page 9

Appendix One Intermediate Zone Assessment 
The following table outlines the UK Government's assessment and ranks IZ using data from
the Scottish Community Needs Index (SCNI) and Scottish Index of Multiple Deprivation
(SIMD), in order of most in need areas in North Ayrshire. The SCNI rank and the SIMD
ranks have been combined using a 75:25 weighted average to form a combined index for
each 2011 IZ. IZ in yellow are excluded from consideration as they fall within a UK
Parliamentary Constituency with an existing award. 
IZcode  IZname 
IZ
population 
UK
Parliamentary
Constituency
Combined SIMD &
SCNI Rank (where
1 is most
disadvantaged) 
S02002105  Irvine Castlepark North  3399  Central Ayrshire  2 
S02002102  Irvine Bourtreehill  2329  Central Ayrshire  3 
S02002121
Kilwinning West and
Blacklands  4044  Central Ayrshire  4 
S02002118  Stevenston Hayocks  3831
North Ayrshire
and Arran  6 
S02002106  Irvine Castlepark South  3374  Central Ayrshire  11 
S02002120  Kilwinning Pennyburn  2984
North Ayrshire
and Arran  12 
S02002101  Irvine Broomlands  2596  Central Ayrshire  13 
S02002111  Saltcoats Central  3511
North Ayrshire
and Arran  15 
S02002132
Kilbirnie South and
Longbar  3911
North Ayrshire
and Arran  16 
S02002112  Ardrossan Central  2954
North Ayrshire
and Arran  17 
S02002116  Saltcoats North East  4949
North Ayrshire
and Arran  19 
S02002114  Ardrossan North East  4235
North Ayrshire
and Arran  23 
S02002109  Irvine Fullarton  2424  Central Ayrshire  51 
S02002107  Irvine East  3000  Central Ayrshire  53 
S02002131  Kilbirnie North  3187
North Ayrshire
and Arran  74 
S02002103
Irvine Girdle Toll and
Stanecastle  4302  Central Ayrshire  79 
S02002100  Dreghorn  3357  Central Ayrshire  85 
S02002110  Stevenston Ardeer  2981
North Ayrshire
and Arran  109 
S02002104
Irvine Perceton and
Lawthorn  4525  Central Ayrshire  127 
S02002123  Dalry East and Rural  2859
North Ayrshire
and Arran  147

Page 10

IZcode  IZname 
IZ
population 
UK
Parliamentary
Constituency
Combined SIMD &
SCNI Rank (where
1 is most
disadvantaged)
S02002126 West Kilbride and Seamill 4454
North Ayrshire
and Arran 156
S02002113 Ardrossan North West 3066
North Ayrshire
and Arran 164
S02002122
Kilwinning Central and
North 3851
North Ayrshire
and Arran 166
S02002124 Dalry West 2915
North Ayrshire
and Arran 168
S02002133 Beith West 2863
North Ayrshire
and Arran 188
S02002128
Largs Central and
Cumbrae 4605
North Ayrshire
and Arran 191
S02002117 Stevenston North West 2587
North Ayrshire
and Arran 193
S02002097 Arran 4643
North Ayrshire
and Arran 202
S02002134 Beith East and Rural 3933
North Ayrshire
and Arran 220
S02002119
Kilwinning Whitehirst Park
and Woodside 4818
North Ayrshire
and Arran 237
S02002098 Springside and Rural 3240 Central Ayrshire 241
S02002108 Irvine Central 3229 Central Ayrshire 254
S02002129 Largs North 3954
North Ayrshire
and Arran 410
S02002115 Saltcoats North West 3329
North Ayrshire
and Arran 435
S02002130 Skelmorlie and Rural 2757
North Ayrshire
and Arran 472
S02002127 Largs South 3652
North Ayrshire
and Arran 480
S02002099 Irvine Tarryholme 3134 Central Ayrshire 552
S02002125 Fairlie and Rural 3631
North Ayrshire
and Arran 747

Page 11

Appendix Two 
The completed UK Government submission and map showing the extents of the
proposed Three Towns neighbourhood are provided below.

Page 12

Pride In Place Neighbourhood Selection Questionnaire 
1. Suggested name for proposed neighbourhood 
The name should clearly communicate the proposed neighbourhood area in a way that
would be recognised and easily understood by local residents.
The Three Towns – this submission is subject to Cabinet consideration/approval on 02
December 2025.
2. Existing government support targeted at the proposed neighbourhood 
Please provide an outline of any pre-existing government programmes targeted at
regeneration or community support in this area. e.g. SG’s Empowering Communities
Programme.
The Council has placed the regeneration of communities at the heart of its agenda. This
focus is reflected within the priorities of the Council Plan and Community Wealth Building
Strategy. The Regeneration Delivery Plan sets out our priorities for delivering on these
ambitions and was approved by Cabinet on 23 March 2021. 
The Plan focuses on the delivery of physical regeneration. Informed by stakeholder
consultation, reviewing existing community priorities and the output of previous
consultations, it aims to address local priorities, support changes within communities and
deliver a well-being economy. 
The Regeneration Delivery Plan is delivered through an ambitious rolling action focused
programme. This approach seeks to ensure that the project list never exceeds a realistic
assessment of capacity, with projects prioritised annually. It informs priorities for securing
and delivering against funding sources informed by communities’ ambitions and priorities. 
In recent years, North Ayrshire Council has received targeted funding support from UK and
Scottish Government from a range of regeneration funding sources. In relation to the Three
Towns, this includes: 
- UK Community Renewal Fund for Place Framework development in Saltcoats
- UK Shared Prosperity Fund to support community initiatives
- Scottish Government Place Based Investment Programme to support community
initiatives, public realm improvements and climate change opportunities.
- Scottish Government Regeneration Capital Grant Fund for projects including
Ardrossan Promenade, Stevenston Beach Hub and Saltcoats Training Station
- Scottish Government Vacant and Derelict Land Funding to support works being
delivered as part of the Ardrossan Coastal Quarter
- Scottish Government Town Centre Fund for public realm improvements, shopfront
improvements, and development of community priorities
- UK Government Levelling Up Fund for the B714 Upgrade. 
Proposals for each allocation are considered by Cabinet on an annual basis, the 2025-26
Cabinet Paper is available to view via the following link: Document.ashx.
North Ayrshire is one of three local authorities involved in the Collaboration for Health Equity

Page 13

in Scotland (CHES) programme, alongside national partners in the form of Public Health
Scotland the Institute for Health Equity (led by Professor Sir Michael Marmot). Participation
in this programme is increasing our focus on improving health outcomes and reducing health
inequity through the lens of the social determinants of health. 
The programme includes a focus in the Three Towns locality based upon an assessment of
data and need that was reviewed by our CHES Steering Group. Members of that steering
group include senior representatives from North Ayrshire Council, the Health and Social
Partnership, NHA Ayrshire and Arran, business, the third sector and other members of the
Community Planning Partnership. The work in the Three Towns has a key focus on good
employment and fair work across the three intermediate data zones of Ardrossan Central,
Saltcoats Central and Stevenston Hayocks.
As part of this, North Ayrshire is also currently engaged with Public Health Scotland to
become the second test site for the Public Health Approach to Learning (PHAL)
programme. PHAL is a groundbreaking collaborative project in Scotland spearheaded by
Public Health Scotland (PHS), Education Scotland (ES), and the Scottish Prevention Hub
(SPH). Driven by the needs of our Headteachers and schools, its core objective is to
enhance the health, well-being, and educational outcomes of children and young people
(CYP) across the nation and reduce entry into the criminal justice system. Through its data
led multi-agency approach. PHAL highlights the importance of children and young people,
education staff and schools as anchor institutions within our communities and a key focus
for intervention. 
In parallel, we are also part of the Scottish Government’s Fairer Futures Partnership (FFP).
As part of that programme, we are currently working alongside community-based
organisations in the Stevenston Hayocks IZ. Co-designed with Argyle Community
Association, Saltcoats Link Up, and local people with experience of family poverty, support
will be targeted to engage families through activities held in Argyle Community Centre and
Hayocks Community Hall. Based on developing relationships while building skills,
confidence and knowledge with these parents, the Fairer Futures Programme will provide
wraparound, holistic and person-centred support to enable families to determine their own
needs while being alongside them to access a range of services across the key drivers of
child poverty.
The Ayrshire Community Trust (TACT) has been supporting this work issuing co-design
partner grants for the community-based organisations and contributing to the learning and
evaluation of these tests of change. Arran Community & Voluntary Service are also funded
through the TSI Fairer Futures Partnership by Scottish Government in developing training
and capacity building learning opportunities for the third sector’s meaningful role in this work.
3. Organisations involved in community-led regeneration 
Please provide information on any organisations working with the community to deliver
regeneration projects and community owned assets within the proposed area - e.g.
Community Development Trusts, Community Councils.
North Ayrshire Community Planning Partnership (CPP) brings together public agencies,
communities, the private and third sectors to work in partnership locally to plan and deliver
better services. 
This includes all services that might affect the community such as: social work, home care,
adult protection, roads, antisocial behaviour services, business support, play parks, housing,

Page 14

education and healthcare- among others. 
They work together on shared priorities which are detailed in the Local Outcomes
Improvement Plan, the North Ayrshire Partnership Plan.
The CPP has six Locality Partnerships covering the Local Authority area. These fulfil the
duty in the Community Empowerment Act 2015 to have locality arrangements. The Three
Towns Locality Partnership covers the three towns of Stevenston, Saltcoats and Ardrossan.
The Locality Partnership provides support for the communities to help them do what is
needed to tackle the issues that they have identified as priorities for their local area. These
are outlined in the Locality Plan. More information including its membership is detailed here.
The LP priorities are: Promoting the local economy and tourism, Regenerating community
facilities, Increasing civic pride and community engagement and Improving community
wellbeing. 
The proposed neighbourhood has a broad range of community organisations who deliver
regeneration projects including Ardrossan Community Development Trust, Stevenston
Community Council, Stevenston Community Company, Raise your Voice Ardeer, Ripple
Effect Saltcoats, Ardrossan Community Sports Hub, Whitlees Community Association,
Three Towns Growers, Hayocks Tenants and Residents Association, Scottish Centre for
Personal Safety and North Ayrshire Foodbank and Larder. 
In addition to the above, the Tenants and Residents Association (TARA) in Stevenston
Hayocks have successfully received funding for developing a much-needed local playpark
for community regeneration. 
In relation to Community Asset Transfers in the Three Towns, two have been completed
and another six potentials are in progress.
4. Information about acute social or economic issues within the proposed
neighbourhood area 
Please provide information about economic and social issues in the area that are unlikely to
be captured in the SIMD 2020 data. For example please provide qualitative and/or
quantitative information about the impacts from the closing of a key local employer;
increased levels of homelessness due to housing shortages; community cohesion or
integration challenges; or rising levels of crime or anti-social behaviour.
Unemployment rates
The 6 IMZs have historically suffered from higher unemployment rates than Scotland or
North Ayrshire overall, indicating lack of available jobs, and skills mismatch, among other
issues (see Table 1 below) (claimant count data used as a proxy for unemployment rate
here):
Table 1
Intermediate Zone 2021 2022 2023 2024 2025
Ardrossan Central 12.4% 10.5% 10.3% 9.7% 9.2%
Saltcoats Central 11.9% 9.0% 10.7% 10.0% 8.3%
Stevenston Ardeer 8.2% 6.0% 5.5% 5.2% 4.2%
Stevenston Hayocks 9.2% 6.7% 6.9% 7.3% 6.1%
Stevenston North West 8.1% 6.4% 5.7% 4.6% 5.0%

Page 15

North Ayrshire 6.1% 4.5% 4.3% 4.6% 4.0%
Scotland 4.5% 3.2% 3.0% 3.2% 3.0% 
Intermediate
Zone
Ardrossan
Central
Saltcoats Ce
ntral
Stevenston
Hayocks
Stevenston
Ardeer
Stevenston
North West
North
Ayrshire
Scotland
Life
expectancy,
females
75.1 76.6 81 80.8 77.6 79.5 80.7
Life
expectancy,
males
66.3 67.8 73.7 75.3 69.9 74.6 76.5
Deaths all
ages per
100,000
1753 1889 1162 1758 1645 1310 1172
Deaths,
aged 15-44
years per
100,000
333.4 236 154.5 158.6 482.5 161 111.7

Page 16

Early
deaths from
cancer,
aged <75
years per
100,000
225.7 215.2 167.7 130.8 277.8 160.9 142.4
Early
deaths from
coronary
heart
disease
(CHD), aged
<75 years
per 100,000
170.9 155.3 76.2 35.3 52.4 72.3 54.5
Data: ScotPHO 
The performance against the equivalent indicators for North Ayrshire and Scotland is poor,
almost across the board. To focus on some of the most concerning indicators: 
• Male life expectancy: for Ardrossan Central this is 66.3 years. This is 8.3 fewer years
than North Ayrshire and 10.2 fewer years than for Scotland.
• Deaths aged 15-44 years (per 100,000): at 333.4 for Ardrossan Central, this is more
than double the North Ayrshire rate and almost three times the rate for Scotland. For
Stevenston North West this is 482.5: more than four times the Scottish rate.
• Early deaths from coronary heart disease, aged <75 years (per 100,000): for Saltcoats
Central, at 155.3, this is almost three times the Scottish rate and more than double the
rate for North Ayrshire. 
Children and young people 
Intermediate
Zone
Ardrossan
Central
Saltcoats
Central
Stevenston
Hayocks
Stevenston
Ardeer
Stevenston
North West
North
Ayrshire
Scotland 
Percentage
of children
living in
poverty
(previously
low income
families)
42.7 37.5 40.1 23.8 27.9 29.4 21.8 
Percentage
of children
with
developmen
tal
concerns at
27-30
months
assessment
19.30 25.70 25.70 14.90 25.50 19.8 16.9 
Percentage
of children
with
attendance
below 90%
(2024)
49% 48% 42% 35% 38% - -
Looking at a selection of socio-economic indicators related to children, again, the data is
concerning when we compare to the picture for Scotland and North Ayrshire: 
• Percentage of children living in poverty (previously low income families): for all of the six
IMZs, except for Stevenston Ardeer, there are high or very high levels of child poverty
compared to the Scottish and North Ayrshire rates. Ardrossan Central, in particular,

Page 17

has an exceptionally high child poverty rate of 42.7%: almost double that of Scotland.
• Percentage of children with developmental concerns at 27-30 months assessment: for
Saltcoats Central and Stevenston Hayocks, 1 in 4 children fall into this category. This
compares to approximately 1 in 5 for North Ayrshire and fewer than 1 in 5 for Scotland. 
Feedback gathered from 146 local families across the Three Towns during FFP community
conversations over summer 2025 highlighted that child poverty is not just about income
but about opportunity, wellbeing, and inclusion. The absence of affordable activities,
safe play spaces, and accessible support services means that children living in poverty
experience restricted opportunities compared to their peers. Parents spoke openly
about the stress of financial insecurity, the stigma in seeking help, and the barriers to
participation in community life. At the same time, families identified solutions that could
directly reduce the impacts of poverty: free activities, food provision, stigma-free advice, and
greater investment in community-based services.
A researched and understood impact of child poverty correlates to effects on children’s
attainment in education, perpetuating a longer-term cycle of intergenerational poverty with
less opportunity for fair work and employment as adults. Part of the FFP data collation has
highlighted the difference for children in receipt of school clothing grants to their peers at
school without this grant. An example of this in Saltcoats North East shows only 58% of
children with SCG will reach expected attainment in literacy compared to 86% of their peers,
while for numeracy attainment this is 62% for children with and 85% for children without
SCGs. 
Intermediate Zone Percentage  Percentage  Percentage  Percentage   Percentage   Percentage
of children   of school   of school   of school  of P1 + P4 +  of P1 + P4 +
with leavers leavers leavers P7 children P7 children
attendance gaining at gaining at gaining at  attaining  attaining
below 90%  least one  least one  least one CfE level in CfE level in
(2024)  award at  award at   award at literacy numeracy
SCQF level 5 SCQF level 5 SCQF level 6  (2024)  (2024)
or better in or better in  or above
Literacy Numeracy (2022-24)
(2022-24) (2022-24) 
Ardrossan Central 49% 78% 66% 71% 63% 68%
Saltcoats Central 48% 71% 50% 50% 77% 83%
Stevenston Hayocks 42% 82% 66% 71% 70% 80%
Stevenston Ardeer 35% 67% 56% 53% 68% 70%
Stevenston North West 38% 73% 60% 57% 77% 75% 
Other notable indicators: 
Intermediate Zone Percentage Child Child Number of
of children  dental  dental children under
with health in health in  16 actively
developme primary 1 primary 7  benefitting
ntal   from Scottish
concerns at Child Payment
27-30
months
assessment
Ardrossan Central 19.30 50 87.5 240
Saltcoats Central 25.70 43.3 80 340
Stevenston Hayocks 25.70 51.1 58.7 540
Stevenston Ardeer 14.90 69 85.7 295

Page 18

Stevenston North West 25.50 69.2 63.6 185     
North Ayrshire 19.8 69 70.1 10385
Scotland 16.9 73.9 76 325790 
Intermediate Zone Claimant
(count)
Claimant
(%)
Percentage
of population
in receipt of
out of work
benefits
Percentage
of school
leavers in a
positive
post-school
destination
(2022-24)
Percentage
of young
adults (16-19
year olds)
participating
in education,
training or
employment
Crime
rate per
10,000
Emergency
patient
hospitalisations
per 100,000 
Ardrossan Central 170 9.0% 41.3 95% 91 2271 11004 
Saltcoats Central 180 8.6% 37.6 93% 88 2964 10410 
Stevenston Hayocks 160 6.5% 28.7 96% 88 1549 9918 
Stevenston Ardeer 85 4.4% 24.4 97% 92 1669 10262 
Stevenston North
West
75 5.3% 26.5 96% 92 2404 9978 
North Ayrshire 3,290 N/A 20.8 N/A 92 1389 8624 
Scotland N/A N/A 14.4 N/A 93 1335 7243 
Across the Three Towns there has been extensive consultation to identify community needs. 
The local priorities have been decided by each locality and were based on information
gathered about their own local area. This includes national data, local statistics and the
views of local people through the people’s panel survey and by using the place standard
tool to identify need. The overarching Locality Priorities for the Three Towns are: 
1. Promoting the local economy and tourism
2. Regenerating community facilities
3. Increasing civic pride and community engagement
4. Improving community wellbeing 
As noted above there has been additional specific work within the towns, which has been
summarised below, and full detail attached to this submission.
Three Towns Charette
In June 2017 people from across the Three Towns of Ardrossan, Saltcoats and Stevenston
in North Ayrshire came together to develop the Three Towns Charette and create a plan for
making positive changes across the area.
Stevenston Local Place Plan
The Steventon Local Place Plan was prepared by Stevenston Community Council in 2024.
The plan was informed by a data driven approach utilising community surveys to identify
ideas, and a subsequent survey to prioritise these ideas.
The community’s main aspirations for the town focused on radically improving the town
centre in terms of its open space and retail infrastructure and protecting the town’s green
spaces and built heritage. 
Saltcoats Place Framework
Saltcoats was one of three towns in North Ayrshire selected as part of a pilot to develop a

Page 19

Place Framework approach, with funding and support from the UK Government under the
Community Renewal Fund (CRF) and Scottish Government under the Place Based
Investment Programme (PBIP). 
This place-based approach seeks to enable and support socio-economic and environmental
regeneration in response to local priorities and need, and in line with Council and
Government policy objectives. The Saltcoats Place Framework is deliberately aligned
with the strategic objectives of the Three Towns Locality Planning Partnership. The Place
Framework also supports, and should be read in conjunction with, relevant local and
national policies to help deliver local impact and outcomes.
1. Town Centre and ‘High Street’ Projects
2. Coastal/Seafront Projects
3. Enhancing a Network of Open Space Amenities.
4. Improving Connections throughout Saltcoats.
5. Providing Convenient Access to Good Local Services, Amenities and Opportunities. 
Ardrossan Community Development Trust consulted extensively in 2023 as part of their
wider business planning when submitting a Community Asset Transfer. The work brought
out a consistent set of themes from the Ardrossan community: 
• Development of the seafront and promenade;
• Securing better sporting, leisure and play facilities particularly for young people;
• Creating a town that tourists and visitors want to visit;
• Enhancing the natural and historical assets of the town; and
• Levering in funding & investment bringing employment opportunities
5. Information about social capital building potential in the proposed
neighbourhood area.
The SCNI has been used to identify areas with low social capital - specifically those with
lower levels of:
● Presence and accessibility of community, civic, educational, and cultural facilities
● Civic participation, engagement with the third sector
Please provide any information about local potential to build social capital in the
neighbourhood by increasing the above. For example, please provide data and information
on community asset transfer requests, community wealth building projects, or co-operative
enterprises.
Within the attached documentation there are a broad range of social capital projects which
demonstrate the level of community engagement and community-led regeneration.
The priorities above demonstrate the community needs within each town, and the
overarching locality priorities, which bring the towns together. 
Intermediate Zone  Accessible People living Recreational Social and
public open  in 15% most  resources  cultural
spaces  'access space
deprived'
areas
Ardrossan Central 100 0 100 92
Saltcoats Central 100 0 100 100
Stevenston Hayocks 100 0 100 88

Page 20

Stevenston Ardeer 85 0 85 72
Stevenston North West 100 0 94 98
6. Boundaries of proposed neighbourhood 
This should be a single contiguous area containing between approximately 5,000 people
and 15,000 people. The boundaries should be defined using a contiguous cluster of either
‘2011 Data Zones’ or ‘2011 Intermediate Zones‘ - using Scotland Census 2022 population
data. 
Please provide a map of the proposed boundary if possible. The Scotland Office is
available to assist with this if required. 
7. ‘High need’ Intermediate Zones within the proposed neighbourhood 
Please indicate which of the listed high-need IZs (using the list we have provided) fall within
the proposed neighbourhood boundary 
IZcode IZname IZ
population
Combined IMD & CNI
Rank (where 1 is most
disadvantaged)
S02002118 Stevenston Hayocks 3,831 6
S02002111 Saltcoats Central 3,511 15
S02002112 Ardrossan Central 2,954 17

Page 21

S02002117 Stevenston North West 2,587 193
S01011234 Stevenston Ardeer - 02 (DZ) 1007 109
S01011235 Stevenston Ardeer – 03 (DZ) 297 109
S01011236 Stevenston Ardeer – 04 (DZ) 454 109
Total  14,641

Page 22

Stevenston
Hayocks
Ardrossan
Central 
Stevenston
North West Stevenston
Ardeer
Saltcoats - 03
Central  Stevenston
Ardeer - 04 
Stevenston
Ardeer
- 02 
Legend
2011 DTZ & IMX SG
Map Title: 
Three Towns
Neighbourhood Plan
Logo: 
Scale:
1:20,000
Paper Size:
A3
Copyright Statement:
Reproduced from the Ordnance Survey
map with the permission of the Controller
of His Majesty's Stationery Office © Crown
Copyright. Licence No. 100023393.