NORTH AYRSHIRE COUNCIL 
02 December 2025 
Cabinet 
Title:    North Ayrshire Asset Management Strategy & Plans 
Purpose:  To seek Cabinet approval of the refreshed North Ayrshire
Corporate Asset Strategy and associated Asset Management
Plans 
Recommendation:  That Cabinet approves the North Ayrshire Corporate Asset
Strategy and Plans at Appendix 1. 
1. Executive Summary 
1.1 The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from pre-
acquisition through to end of life.
1.2  This report updates the Corporate Asset Strategy incorporating individual Fleet,
Roads, Housing, Property, Open Space and ICT asset management plans. The
review has been informed by various key drivers including the North Ayrshire Council
Plan, our Community Wealth Building approach, climate change emergency and the
ongoing financial challenges facing the public sector.
1.3 Key areas of asset management opportunity include how we maximise the use of our
land and property assets and how we can manage assets in such a way to contribute
to our Council Plan priorities of wellbeing, tackling climate change, and supporting
communities and local democracy, for example by investing in energy efficiency
measures and decarbonisation of buildings and fleet, or supporting communities to
acquire buildings through Community Asset Transfer.  
1.4 Robust asset management also plays a key role in developing the Council’s Medium
Term Financial Strategy through the realisation of efficiencies and enhanced
utilisation of assets. The plans are also an integral delivery mechanism to ensure the
Council delivers ‘Best Value’. The proposed Corporate Asset Strategy and Plans at
Appendix 1 reflect updated priorities and challenges to ensure an approach to asset
management that remains fit for purpose.

Page 2

2. Background 
2.1 The Local Government (Scotland) Act 2003 places a duty on local authorities to
demonstrate ‘Best Value’ in delivering their services and in managing any assets they
hold. Typically, individual councils hold assets worth millions of pounds and it is in the
interest of councils and their communities to ensure that the most effective use of
these assets is being made.
2.2 Asset management plans are essentially a decision-making framework used to
identify assets, their value, their use and how they support the Council’s overall aims
and objectives. Asset management plans are therefore also important tools to assist
in the planning of capital and revenue expenditure.
2.3 More widely, there is a need for our asset management approach to align closely with
the North Ayrshire Council Plan, reflecting the strategic priorities of wellbeing,
communities and local democracy and climate change. In addition, a key objective of
Community Wealth Building is maximising the use and function of our land and
property assets for the benefit of local people. This includes exploring alternative use
of council owned assets for communities or businesses and supporting Community
Asset Transfer to grow community ownership.
2.4 The landscape in which Council services are delivered is constantly changing, with
direct impacts on how assets are used and managed. The shift to more agile working
patterns has changed how our buildings are used, and the development of several
school campus projects in recent years has provided opportunities for community
services to be co-located.  
2.5 The current economic climate has significantly increased the operating and
maintenance costs of our asset portfolio and placed a renewed focus on the
sustainability of assets going forward.  
2.6 The climate change emergency has far-reaching implications for our assets: the
decarbonisation of buildings and vehicles, infrastructure requirements for active travel,
opportunities to use our assets for renewable energy generation, and protecting and
enhancing our habitats to capture carbon. 
2.7  The overall aims and objectives of our refreshed CAS are:
• That our asset management approach is aligned to the delivery of key
Council and partner strategies, including the North Ayrshire Council Plan;
• That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of
a clear and co-ordinated framework;
• That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered;
and
• That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place. 
2.8  Audit Scotland published a Best Value Assurance Report for North Ayrshire Council in
June 2020. A key area of focus for the audit was how the Council manages its assets.
The report noted that the Council has demonstrated a culture of continuous

Page 3

improvement since a previous report by the Accounts Commission in 2011. Central to
the approach is sound governance arrangements for asset management, and the
proposed CAS at Appendix 1 sets out the roles and responsibilities, prioritisation and
decision making criteria for our assets. The previous audit reports have been further
augmented by the recently received 2025 Controller of Audit Report on North Ayrshire
Council.
2.9  The refreshed CAS also provides the framework for performance and risk
management and reporting as part of our asset management approach. 
2.10  The CAS includes individual asset management plans for the six categories of asset:
property, housing, roads, fleet, open space and ICT. Each individual asset plan aims
to ensure that the Council holds the right assets and that they are fit for purpose in
terms of condition, suitability, sufficiency and accessibility. The asset plans, including
condition survey information, are used to inform the capital investment programme. 
3. Proposals 
3.1 It is recommended that the Cabinet approves the refreshed Corporate Asset Strategy
and Plans at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Implementation of the asset management plans associated with this report will be
funded through existing resources. Robust asset management planning allows the
Council to maximise the benefit from investment. 
Human Resources 
4.2 None 
Legal 
4.3 These plans set the overall strategy for the Council’s assets. Individual assets (such as
those held by the Common Goods or Trusts) or particular proposals (such as sale or
asset transfer of assets) are subject to specific legal requirements. However,
overarching all is the duty on the Council to demonstrate Best Value in the use of its
assets and resources. 
Equality/Socio-economic 
4.4 Implementation of the asset management plans underpins the Council’s equality and
socio-economic duty, by, for example: 
• Ensuring availability of affordable, accessible, well-maintained housing
• Ensuring access to public services through availability of well-maintained
property assets including schools, libraries and community centres
• Availability of quality public open spaces, for physical activity and health and
wellbeing benefits

Page 4

Climate Change and Carbon 
4.5 The Council’s asset management plans recognise the opportunities to tackle climate
change through efficient asset management, for example: investment in energy
conservation measures in our houses and non-domestic buildings; using our assets to
generate renewable energy; continued decarbonisation of our vehicle fleet; construction
of new electric vehicle charging points; and journey reduction through the use of
technology. 
Key Priorities 
4.6 The proposal will contribute to achieving the Council Plan priorities and key activities
of: Supporting local businesses and economic opportunities; Supporting local
businesses as they meet their climate change obligations; and Maximising value from
the use of our assets. 
Community Wealth Building 
4.7 The proposal will contribute to the delivery of the Land and Assets pillar, objectives, and
associated actions of the Community Wealth Building Strategy. 
Islands Communities Impact Assessment (ICIA) 
4.8 The asset management strategy and plans help to ensure the equitable use of assets
on our islands. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 A cross-service officer working group was established to review and refresh the
approach to asset management and to ensure a consistency of approach in preparing
the individual asset management plans. The asset management plans have been
developed in consultation with partners and customers where appropriate. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Laurence Cree, Head of Sustainability, Transport
& Corporate Property, on 01294 324514. 
Background Papers
0

Page 5

No embedded text on this page.

Page 6

NORTH AYRSHIRE COUNCIL 
CORPORATE ASSET MANAGEMENT
STRATEGY 2025-30

Page 7

1. Introduction 
The Council has a variety of assets which are integral to service delivery. Asset
management is a structured and systematic approach to managing assets on an
ongoing basis. This approach addresses all phases of an asset's life cycle, from
pre- acquisition through to end of life. Effective asset management planning
means knowing what you own, where it is located, who is responsible for it, the
operation and maintenance costs, and what role the asset has in current and
future service delivery. 
As part of the asset management process, we need to ensure that assets are: 
• fit for purpose 
• used efficiently 
• maintained on a sustainable basis 
• matched in investment terms to service needs and delivery of the Council
Plan.  
This Corporate Asset Strategy (CAS) sets out a framework for the management
of the Council’s core assets and infrastructure, with individual, detailed asset
management plans for the Council’s key asset groups as appendices to the
document. 
2. Aims & Objectives 
Plans for the future should ensure that assets are used primarily to enable the
most effective provision of services together with the achievement of strategic
objectives; and that this should be done in the most efficient manner. The CAS
aims to provide an integrated approach to realising the Council’s overall strategic
aims and objectives for optimising assets. 
The North Ayrshire Partnership Plan (NAPP) (formerly the Local Outcomes
Improvement Plan) is administered by the North Ayrshire Community Planning
Partnership and consists of public, private and voluntary organisations and
groups working together with communities through our six Locality Partnerships
to make North Ayrshire a better place to live. The NAPP has three key themes:
Wellbeing, Work and World. 
Alongside the wider NAPP, the CAS and
individual asset management plans play a
central role in delivery of the most recent
Council Plan. The latest review of the CAS
and plans therefore reflects the following
Council Plan priorities: 
• Wellbeing 
• Communities and Local
Democracy 
• Climate Change 
• A Sustainable Council

Page 8

Alongside delivery of day-to-day services, there are also a wide range of
overarching Council strategies where delivery is contingent on the effective use
of assets, for example: 
• Community Wealth Building Strategy 
• Sustainable North Ayrshire Strategy 
• Local Housing Strategy 
• Regeneration Delivery Plan 
• Open Space Strategy 
• Learning Estate Strategy 
• Digital Strategy 
• Technology Strategy 
• Sustainable Change Programme 
It is within this context that the aims and objectives of the CAS are set. These are: 
• That our asset management approach is aligned to the delivery of key Council
and partner strategies, including the North Ayrshire Partnership Plan and
Council Plan 
• That we maximise the efficient and effective use of all Council assets for the
benefit of those that live, work, visit or do business in North Ayrshire as part of
a clear and coordinated framework 
• That, through our sustainable change programme, we review our assets to
ensure that the portfolio is lean and fit-for-purpose and that opportunities to
reduce pressure on capital and revenue budgets are identified and delivered 
• That available investment in assets is prioritised, with clear governance,
assessment and decision-making arrangements in place 
3. Drivers for Change 
The landscape in which Council services are delivered is constantly changing,
with direct impacts on how assets are used and managed. 
The shift to more agile working patterns has changed how our buildings are used,
and the development of several school campus projects in recent years has
provided opportunities for community services to be co-located. 
The cost-of-living crisis has significantly increased the operating and
maintenance costs of our asset portfolio and placed a renewed focus on the
sustainability of assets going forward. 
The climate change emergency has far-reaching implications for our assets, for
example the decarbonisation of buildings and vehicles and adaptation in
preparation for increase flood risks and extreme weather events. 
However, despite these challenges there is opportunity for this work to bring a
variety of benefits to our communities, for example through active travel
infrastructure, renewable energy generation, and protecting and enhancing our
habitats to capture carbon and create nature networks.

Page 9

The Council are pioneers in Community Wealth Building (CWB) and launched
Scotland’s first Community Wealth Building Strategy in May 2020. CWB aims to
retain wealth and economic benefits within the local area, making our
communities more inclusive, resilient and sustainable. A key objective of CWB is
maximising the use and function of our land and property assets for the benefit of
local people. This includes exploring alternative use of council owned assets for
communities or businesses and supporting Community Asset Transfer to grow
community ownership. 
As a key pillar of Community Wealth Building, the successful implementation of our
asset  management plans will contribute to the delivery of our Community Wealth
Building objectives:   
• reductions in poverty and inequality in North Ayrshire 
• more well paid and fair jobs for local people 
• more local businesses, including those owned by communities and workers 
• sustainable communities with increased levels of wellbeing and that are proud
of the places they live 
The Council’s capital and revenue budgets continue to face significant pressure,
compounded by recent inflation and borrowing cost rises. There are less and less
resources available to meet the investment, operating and maintenance
requirements of our asset estate. 
In order to respond to these drivers, the Council has an extensive sustainable
change  Programme. There are robust officer-led governance arrangements in place
to monitor its Sustainable Change Programme through the Transformation board.
The Executive Leadership Team are all members of the Transformation board and
are well sighted on the Council’s transformation workstreams. 
The appropriate use and management of the Council’s assets is key to
delivering transformational change and in particular workstreams have been
established to address issues such as the decarbonisation of the Council's fleet,
the rationalisation and efficient use of land and property and our digital and data
assets. 
4. Governance 
The diagram below provides the governance arrangements for corporate asset
management within the Council:

Page 10

4.1 Roles and Responsibilities 
Audit Scotland published the latest Best Value Assurance Report for North
Ayrshire Council in June 2020. A key area of focus for the audit was how the
Council manages its assets. The report noted that the Council has demonstrated
a culture of continuous improvement since a previous report by the Accounts
Commission in 2011. Central to the approach is sound governance arrangements
for asset management. This was further augmented by the recently received 
2025 Controller of Audit Report for North Ayrshire Council.  
Cabinet approves the corporate framework and the medium and longer term
investment programme. 
The Executive Leadership Team, the Capital Programme and Assets Group
(CPAG) and Directorate & Service Project Boards ensure officer co-ordination of
corporate asset management and support the Council and Cabinet at chief officer
and senior management levels. 
CPAG is chaired by the Head of Finance, with representation from senior officers
across all Services. It meets on a quarterly basis with the remit of: 
• ensuring a strategic and corporate approach overview of asset
management to ensure the Council’s resources are deployed effectively 
• developing and delivering the corporate asset management plans 
• developing and delivering the Council’s capital investment programme,
minimising slippage on the delivering the programme

Page 11

• developing clear criteria for investment of Council resources on asset
matters and assessing all investment business cases 
• developing and monitoring performance across all asset classes 
• developing a capital receipts strategy 
• developing and implementing best practice in all asset matters Chief
Officers and Senior Managers are responsible for: 
• working together to ensure a corporate approach to asset management is
in place and delivering the Council’s asset management plans and
associated investment programme 
• contributing to the development and delivery of asset strategies and plans;
and 
• ensuring consultation on asset management is undertaken with all relevant
stakeholders 
• Directorate and Service Project Boards are responsible for: 
• Ensuring capital and asset plans are being implemented efficiently and
effectively 
• Taking corrective action to ensure delivery plans remain with agreed
parameters of time and budget 
• Escalating relevant issues to the Executive Leadership Team and and/or
CPAG 
4.2 Asset Plans 
The Council’s CAS and plans have been reviewed in line with the CIPFA’s ‘A
Guide to Local Authority and Public Sector Asset Management’ published in 2020.
Our assets are classified under six categories, with an associated plan for each as
an appendix to the CASL 
Asset Plan Directorate Chief Officer
Property (including Common Good
assets) 
Place  Head of Sustainability, Corporate
Property & Transport 
Housing  Place  Head of Sustainability, Corporate
Property & Transport and Head of
Housing & Public Protection 
ICT  Chief Executive’s  Head of People & ICT 
Roads (including 
structures, lighting and water
infrastructure) 
Place  Head of Neighbourhood Services 
Open Space  Place  Head of Neighbourhood Services 
Fleet including vehicles, plant and
equipment 
Place  Head of Sustainability, Corporate
Property & Transport 
Each individual asset plan aims to ensure that the Council holds the right assets
and that they are fit for purpose in terms of condition, suitability, sufficiency and
accessibility. The asset plans, including condition survey information, are used to
inform the capital investment programme. 
The asset plans follow a broadly similar structure, setting out the Council’s current
asset base, assessment against the categories within the CIPFA guidance, with
an action plan at the end of each document.

Page 12

5. Funding Strategy 
The Council’s 10-year Capital programme is aligned to the strategic priorities as set
out in the Council Plan and is the product of the various plans and strategies which
impact on the assets and infrastructure of North Ayrshire Council. The plan is
updated annually, with a full refresh undertaken every three years. 
The current 10-year plan includes significant investment in key strategic projects such
as Ardrossan Campus and the upgrade of the B714, and the Ayrshire Growth Deal
which will see the regeneration of the region through investment in strategic
infrastructure across various sectors, including life sciences, tourism, manufacturing
and aerospace. 
The Capital investment is funded from a variety of sources including the General
Capital grant, Scottish Government Specific Capital Grants, Ayrshire Growth Deal,
capital receipts and the use of internal funds. However, most of the Council’s
funding comes from Prudential Borrowing. 
The revenue implications of both the individual projects included within the
Programme and the additional borrowing costs associated with the overall
programme have been incorporated within the Medium Term Financial Plan
approved in February 2025, with further changes incorporated into the plan for
2026/27 to 2028/29.      
Any further revenue implications associated with those projects which are still to be
finalised and will be reported once the detailed business cases have been
approved. 
6. Performance 
The Council must underpin asset management, business case development and
capital and revenue decision making with robust asset performance data. The
Council’s Performance Strategy set out our framework for managing and
reporting on performance. 
In relation to asset management plans, there are a number of performance
indicators as part of our performance framework that provide intelligence on our
asset management performance.    
Specific asset management actions are reported regularly on the corporate
performance management system.

Page 13

1 
ASSET MANAGEMENT PLAN     
FLEET

Page 14

2 
1. Introduction
The Council operates over 500 vehicle and road registered items of plant, with a replacement
value of £27.98 million, along with a large number of other plant and machinery to support the
delivery of services. Assets are primarily maintained in the Council’s workshops at Kilwinning
and Arran supported by specialist external contractors where required. The cost of operating
and maintaining the assets including fuel use is currently £5.09 million per year. These assets
are supplemented by both externally hired assets to meet long-term specialist needs or short-
term business needs accounting for approximately £0.38million annual expenditure. 
The Kilwinning workshop is a DVSA (Driver and Vehicle Standards Agency) approved MOT
testing station for classes 4 (cars, light vans, and passenger vehicles of up to 12 seats), 5
(passenger vehicles with more than 13 seats) and 7 (goods vehicles up to 3500Kg Designed
Gross Weight) and operates a tachograph calibration and repair facility. 
A two-shift working arrangement is in place to enable operational availability of the workshop
from 0630hrs to 1800hrs; this pattern maintains the capacity of the service during the core day
whilst supporting the daily requirements of fleet users. These arrangements are also
complemented by mobile mechanic arrangements as appropriate. The Arran workshop is
available from 0800hrs to 1630hrs.
Operation of Large Goods Vehicles is controlled through a regulatory regime enforced by the
Traffic Commissioner through an ‘Operator’s Licence.’ The Transport Manager is the qualified
holder of the ‘Operator’s Licence’ for the Council and has responsibility to ensure that all
vehicles and drivers operate within the legislative and safety requirements of the conditions
and undertakings imposed by the Traffic Commissioner.
2. Aims & Objectives 
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.”
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient   vehicle
asset fleet, contribute towards many of the deliverables of the Council Plan across all Council
services which include:
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council 
Effective management of fleet related assets is critical to the delivery and performance of
Council services. This Fleet Asset Management Plan sets out and controls the management
of the Council’s fleet related assets. Our vision is to provide effective fleet procurement,
management, and a workshop maintenance service, enabling our users to deliver safe,
reliable, and cost-effective services to our communities, with a commitment to significantly
reducing our reliance on fossil fuels and to make our assets environmentally sustainable.
The objectives of the Fleet Asset Management Strategy are: 
• Assets fit for purpose - All vehicles/plant and equipment will be ‘fit for purpose’ in terms
of condition and suitability for the intended use.

Page 15

3 
• Safety - The vehicle/plant or equipment must secure the minimum health and safety
risk to our staff and members of the public. 
• Assets used effectively – Assets will be treated as a corporate resource, and the need
to own/maintain the vehicles/equipment will be regularly challenged with users and the
performance of assets will be monitored and reported with the aim of eliminating
unnecessary expenditure. 
• Sustainability - Assets, which run efficiently, maximise value for money, are
environmentally and energy efficient contributing directly to delivering reductions in
carbon emissions inclusive of the environmental life cycle of the vehicle and
component parts (including fuel). This links directly to our Council Plan climate change
priority. 
In meeting these aims the Transport Hub commits to: -
• Collaboration with stakeholders to identify additional value from the standardisation of
vehicles and equipment across North Ayrshire Council.
• Being a key driver of the decarbonisation of the Council’s fleet
• Provision and maintenance of a modern vehicle fleet that is fit for purpose and fully
supports the delivery of front-line services.
• Ensuring Council Services have the appropriate vehicles to carry out their
responsibilities and duties.
• Demonstrating Best Value. 
• Considering the needs of Stakeholders. 
• Ensuring Fleet Asset Management information and data is collected and stored
effectively within its Fleet Management System (Fleetwave). 
• Ensuring vehicles are maintained to DVSA (Driver and Vehicle Standards Agency)
standard.
• Undertaking safety inspections (currently annual for vehicles under 3500kg and every
eight weeks for vehicles over 3500kg as defined by the terms and conditions applicable
to our Operators Licence) to ensure vehicles are fit for purpose, kept roadworthy and
comply with Construction & Use Regulations. 
• Providing in-house Class IV, V & VII MOT facility by DVSA trained mechanics. 
• Using approved and calibrated inspection equipment. 
3. General Description 
The Council operates a fleet of 565 vehicles and plant registered for the road along with many
other plant and machinery to support the delivery of services. The permanent vehicle fleet is
supplemented by 137 short-term hired assets to meet fluctuations in business activities, such
as seasonal work within the Streetscene Service or short/long term contracts within Building
Services and Care at Home.
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually, depending on the type and use of each vehicle. This is
supported by a daily reporting system to identify any defects before vehicles are used to
ensure roadworthiness. All repairs are documented to ensure that works carried out on Council
vehicle assets are recorded to enable effective asset management and to ensure that
throughout the vehicle’s life it is maintained in a safe, legal, and roadworthy condition.

Page 16

4 
The Transport Hub is an accredited Van Excellence operator which is a scheme designed by
some of the best van operators in the UK and facilitated and managed by Logistics UK to
recognise excellence and improve operational standards. At its heart is the Van Excellence
Code which is a code of practice outlining ‘what good looks like in van operations.’ This helps
ensure that the Council continue to operate to nationally recognised best practice standards.
3.1 Asset Types
A breakdown of the fleet by asset type is as follows:
Asset Type Number of
Assets 
Internal
Combustion
Engine (ICE) 
Electric
Vehicle (EV)
Passenger Vehicles (incl 4x4) 52 45 7
Minibuses 27 23 4
Large Goods Vehicles over 3500Kg 72 72 0
Compact Sweepers 12 12 0
Vans and Tippers up to 3500Kg 349 284 65
Road Registered Plant 53 53 0
Total 565 489 76
(July 2025)
3.2 Equipment
In addition to the assets noted above, the Transport Service also maintain a variety of
smaller items of client-owned equipment, principally on behalf of the Neighbourhood
Services teams. This equipment is maintained until the point where repair becomes
economically unviable, with replacement funded by the client. 
Work is on-going at present to develop a strategy to ensure that the client understands the
range and volume of equipment they own, the likely maintenance requirements associated
with this and the cost and likely timescales for replacement.    
4 Current Performance/Drivers for Change 
There are several influences that will impact upon the future requirements and use of the fleet
assets that need to be considered including: -
 National commitments for reduction of transport emissions have been made, with the
2019-2020 Programme for Government committing to phase out the need for any new
petrol and diesel light commercial vehicles by 2025 and to create the conditions to
phase out the need for all new petrol and diesel vehicles in Scotland’s public sector
fleet by 2030.
 The Council’s commitment to achieve net zero carbon emissions by 2030. 
 The Council’s Transformation programme seeks to review the current methods of
delivering services to ensure that the Council can still deliver high quality customer
focused services within reduced financial resources. Many of the Council’s services
utilise fleet assets to support their delivery.
4.1 Increasing Fleet Utilisation and Transport demand management

Page 17

5 
Though the introduction of telematics it is possible to access and manage real time information
on the utilisation and efficient use of the vehicle fleet. This ensures that vehicles are being
used and driven as efficiently as possible. The information enables the Transport Hub to
engage with services and jointly manage demand for vehicles, with the aim to reduce the miles
driven, look at whether trips are necessary, and consider if they can be combined or whether
the optimum routes are being used. 
The reviewing of efficient vehicle use will ensure that vehicles are being used as efficiently as
possible and using the least amount of fuel. The key areas here are driver performance and
vehicle maintenance, as both have a significant impact on fuel. The effective deployment and
analysis of the telematics data will help support the review by evidencing the demand for
vehicles and key areas where we can optimise the utilisation across the fleet. 
4.2 Service Transformation
To meet the financial challenges facing the Council, services are subject to fundamental
review. Where services utilise transport within their delivery it is expected that reviews will
seek to utilise this more efficiently. This may impact upon areas including number or type of
vehicles, the need for transport and hours of operation. 
4.3 Sustainability 
The Scottish Government has set out an ambition to phase out the need for any new petrol
and diesel light commercial vehicles by 2025 and to create the conditions to phase out the
need for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030. 
The need for public sector leadership is key to realising this ambition. The Transport Hub faces
a challenge as it aims to reduce environmental impacts through a combination of cleaner
vehicles and fuels, fuel-efficient operation, and driving; and by reducing the amount of road
traffic it generates. To get to the point where ULEVs can be acquired and deployed into the
Councils fleet successfully, the infrastructure needs to be ready. The Council are already
forging the way with workplace charging options and a decarbonisation of the fleet workstream
has been established within the sustainable change programme, reporting to the
Transformation Board. 
4.4 Business Development / Commercialisation
Commercialising opportunities now forms part of all future business developments of the
Transport Hub, this will include promoting the use of the pool of fleet vehicles and drivers,
maximising the potential use of the Councils MOT test centre and maintenance facility, the
provision of certified driver training and review opportunities for shared services with other
public-sector bodies. 
4.5 Vehicle Advertising
All commercial and light commercial vehicle fleets carry the Council’s corporate
branding/colours and logo. The Council’s distinctive fleet are highly visible throughout North
Ayrshire and is a highly effective channel for outdoor advertising. It is now standard practice
to use these vehicles to promote Council events, services, and campaigns, reducing the need
for other forms of outdoor advertising.

Page 18

6 
5 Condition and Suitability
The Transport Hub provides and maintains vehicles for a range of Council services as set out
in the table below:
Service Area  Owned (ICE)
Vehicles  Hired Vehicles  Electric Vehicles 
Building Services  98 43 13
Roads  40 7 1
Streetscene 119 8 13
Waste Management  52 5 4
Facilities Management  11 6 29
Education & Communities 11 4 2
PMI  0 1 2
HSCP  108 61 4
Corporate Services  1 2 1 
Transport  49 0 7
Total  489 137 76 
A well-maintained vehicle fleet provides a positive image of the Council to the public and
minimises service disruption attributable to breakdowns and associated re-active maintenance
and ensures compliance with the appropriate regulatory frameworks. Getting the most out of
vehicles over a longer period of time and the key aim to maximise the use of each vehicle,
maintain regulatory compliance and wherever possible extend its useful life beyond initial
planned parameters.
Planned Maintenance 
A planned preventative maintenance and inspection schedule is in place at periods ranging
from eight weekly to annually depending on the type and use of each vehicle. In addition,
having an effective way to report defects is a key part of the Councils vehicle maintenance
regime. 
Vehicle Checks 
A ‘nil defect’ reporting system is in place whereby drivers must undertake a range of vehicle
safety checks and complete pro-forma to confirm roadworthiness before use. Where safety
critical defects are identified, a replacement vehicle must be used until the transport service
has completed the appropriate repair. 
Technology 
All Large Goods Vehicle are now specified to have lane assist and AEBS (advanced
emergency braking system) fitted as standard. All vehicle technological advancements are
being reviewed as they become available on the marketplace for the possible inclusion in our
future vehicle purchasing specifications.

Page 19

7 
All vehicle inspections, repairs, servicing works, and fuel use are recorded using the
proprietary ICT fleet management system (Fleetwave) to establish the whole life costs of each
asset. The Fleetwave system ensures that information can be accurately recorded and utilised
to inform future asset management and purchasing decisions. 
Telematics have been installed into most fleet vehicles which reports on vehicle usage and
driver behaviours this technology allows the Transport Hub to easily capture the necessary
data to establish exactly how the fleet is being utilised and where improvements can be made.
All new HGV vehicles purchased are fitted with 360 degree cameras, this allows the operating
service to review any incidents in real time and helps to improve safety by clearly identifying
any incidents or issues.
Driver Training 
Provision of core driver/operator training is undertaken by our in-house Fleet Compliance
Team. This training has been developed to fulfil our health and safety responsibilities, statutory
duty and to provide staff with the skills they need to undertake their roles. We are a Joint
Approvals Unit for Periodic Training (JAUPT) accredited training centre this enables us to
deliver Driver Certificate of Professional Competence training straight to our teams and in a
way that ensures as little disruption to services as possible. We also have a qualified
instructor/assessor accredited to RTITB Road Transport Industry Training Body for delivering
plant and machinery training. 
Driver licence checks are carried out electronically every six months for all fleet asset drivers
to ensure the staff members continue to hold the required category for the type of vehicles
they drive.
6 Sufficiency
Use of Assets
Transport assets are utilised by the Council to assist or facilitate the delivery of services to the
whole or part of the community, businesses, and visitors. Examples include: - 
 Collection of Waste and Recycling from households and businesses;
 Cleaning of Streets and maintenance of public land and open spaces;
 Maintenance and repair of homes for Council tenants;
 Winter maintenance and repair of roads;
 Transportation of school children;
 Care at home and welfare services for elderly and vulnerable members of the
community:
 Provision of hub and spoke catering facilities for school meals. 
Vehicle drivers, passengers and other users are consulted to ensure we are well informed and
that we capture the key requirements needed for securing a fleet that is fit for purpose. These
groups are users of the fleet assets, and their operational knowledge and experience is
important in ensuring the procurement of replacement assets focuses on the right
requirements. This also empowers users in determining better options.
Lifetime Performance
Pressure on the Council’s fleet budgets and a desire to optimise vehicle utilisation has led to
an increasing focus on making vehicles work longer, harder and smarter. However, simply
extending the mileage or length of time for which a vehicle operates is not necessarily the best
way to run an efficient fleet.

Page 20

8 
The Council’s fleet asset management system (Feetwave) enables the Transport Hub to
assess the whole life cost of assets to assist in the replacement plan. Rather than
implementing a fixed vehicle replacement cycle across the fleet, the Transport Hub looks at a
wide number of parameters such as operational measurements, by interrogating an individual
vehicle’s data, the team may find that some vehicles are best replaced after a different period. 
This type of enhanced vehicle replacement forecasting involves the Transport Hub assessing
data about specific vehicles, in order to identify inefficient and costly vehicles for disposal or to
retain vehicles that are performing more efficiently.
7. Financial
7.1 Annual Revenue Costs
The annual revenue cost of maintaining and operating the vehicle and road going plant items
is currently £5.09 million of which £3.21 million is attributable to fleet management and
maintenance and £1.88 million to fuel. 
7.2 Service Level 
The centralised Transport Hub, which incorporates, Fleet Compliance, Maintenance and
Journeys teams allows a more corporate and strategic approach to the management of the
supply and demand for transport across services. The Hub manages all the Council’s
consolidated transport related budgets. 
The cost of transport provision is allocated to services annually based on their specific
requirements. Management information regarding vehicle costs and usage is also available to
users in a form and timescale that enables appropriate management interventions in respect
of use and deployment. The mechanism aims to provide greater transparency and control in
the allocation of costs to services in operating vehicles by allocating costs in the following
ways: -
 An annual fixed fleet management charge per vehicle in respect of the fixed costs and
overheads of service provision;
 A fleet service charge for each vehicle based on planned maintenance and operating
cost along with reasonable levels of wear and tear;
 Re-charge of actual costs incurred for repairs undertaken arising from unreasonable
or inappropriate use of a vehicle thereby enabling appropriate management
intervention;
 Fuel recharges are based on actual consumption by each asset;
 Re-charge of actual contract costs for taxi and plant hire provision. 
7.3 Capital Investment
Assets are currently purchased outright through the Council’s capital programme. Whilst
capital financing can be secured this is the preferred method of purchase as it provides
maximum flexibility and control in the use and lifecycle of the assets. However, the decision
to finance assets will be reviewed on a regular basis to ensure that the most appropriate
method is utilised in response to developments within financial markets.
The Council utilises several national frameworks for purchase, leasing, and hire of plant and
vehicles, and regularly reviews the procurement options available to secure best value. The
frameworks provide a greater reach of suppliers and competitive pricing at a national level

Page 21

9 
while allowing the Council to utilise local suppliers and dealerships where possible for the
provision of assets, linking where possible to our Community Wealth Building ambitions. 
The Council has replaced 537 vehicles at a capital cost of £18.50 million over the past ten
years as set out in the table below. 
Year Number of Vehicles
Replaced
Replacement Cost
(£)
2015/16 92 1.99m
2016/17 54 2.03m
2017/18 61 2.08m
2018/19 97 1.84m
2019/20 37 1.04m
2020/21 52 2.04m
2021/22 29 1.48m
2022/23 12 1.47m
2023/24 71 3.04m
2024/25 32 1.49m
Total 537 18.50m 
The estimated asset replacement costs together with allocated Capital funding are set out in
the table below for each of the next 9 years. The forecast costs include for vehicle
replacements based on 2030 target date to decarbonise the 352-vehicle fleet currently suitable
for the transition to alternative fuelled vehicles. 
Year Estimated Replacement
Costs
(£)
Capital Programme
(£)
Fleet
Decarbonisation
Support (£)
2025/26 5.15m 2.93m 1.91m
2026/27 2.15m 2.98m 1.95m
2027/28 2.85m 2.00m 1.50m
2028/29 2.03m 2.00m 0.00m
2029/30 2.22m 2.00m 0.00m
2030/31 3.01m 2.00m 0.00m
2031/32 2.56m 2.00m 0.00m

Page 22

10 
2032/33 2.83m 2.00m 0.00m
2033/34 5.18m 2.00m 0.00m
Total  27.98m 19.91m 5.36m 
The profiling of the above illustration is based on a decarbonisation model undertaken which
considered remaining lifespan of current combustion vehicles, the need for a managed
approach, and the lead-in time for vehicle charging investment. 
The value of the capital programme during this period is significantly less than the replacement
value due to an increase in today’s purchase costs for alternative fuelled vehicles and the
relevant infrastructure.
It is estimated that the total capital funding required to replace all 352 vehicles suitable for low
emissions alternatives alone to be is £11.79m (which includes both vehicle replacement and
assumed charging costs), based on today’s prices, this equates to a 100% (£7.18m) increase
in costs compared to ICE (Internal Combustion Engine) vehicles. The figure also excludes
those 137 vehicles which do not currently have a cost-effective solution.
Additional / Revised Investment was approved in February 2024 in support of the Council’s
Sustainable North Ayrshire Strategy 2024-27, an additional investment of £5.430m in the
decarbonisation of the Council’s fleet was included. This investment will support the Council’s
Fleet Decarbonisation Route Map through the replacement of fossil fuelled vehicles with
electric vehicles and more environmentally sustainable fleet solutions.
The ability of the Council to decarbonise the fleet in the short to medium term will be
particularly challenging. However, the estimated figures may change due to ongoing
Transformation Projects and Service reviews which may impact upon the number of vehicles
required in the future. Further information is provided at section 13 below.
7.4 Expiry
The vehicle replacement plan identifies the anticipated lifespan to enable accurate financial
planning. However, to maximise the value of each asset replacement is made on a condition
basis or a notable change in user requirement. To extend their life vehicles may be transferred
to other services, utilised within the central transport pool to reduce the need for hire vehicles
or used to replace a vehicle that is no longer economically viable.
We are also likely to see an increase in the length of lead time for vehicles for all fuel types,
but more so for alternatively fuelled vehicles, which have an increasing demand and smaller,
more expensive, production runs. Improved planning for replacement cycles for vehicles is
therefore essential.
7.5 Disposal
At the end of their useful life with the Council vehicles are disposed of through an auction
house or directly to specialist dealers ensuring that the best price is attained. Vehicles which
are deemed to be beyond any use at end of life will be disposed of through recognised
accredited vehicle dismantlers. Such receipts are not expected to exceed £100,000 annually
and are returned to the Council’s capital fund.

Page 23

11 
8. Legislation
There is an extensive regulatory regime in place regarding the provision and operation of the
assets which in the case of Large Goods Vehicles is enforced by the Traffic Commissioner.
An operator's licence (or O licence) is the legal authority needed to operate goods vehicles in
Great Britain. The licence is issued by the Traffic Commissioner – the independent regulator
of the commercial road transport industry; a Traffic Commissioner also has powers to take
regulatory action against a licence holder where they fail to meet the expected standards of
operation. The Transport Hub acting as the Councils,fleet operator must ensure compliance
and relevant process are in place. 
When planning for fleet provision, cognisance of the following legislative requirements is
required:
• Operator’s Licence (Goods Vehicle – Licensing of Operators) Act 1995
• Construction and Use Regulations 1986
• Vehicle Lighting Regulations 1986
• Driving Licences Regulations 1999
• The Road Traffic Act 1991
• Registration and Licensing Regulations 1971
• The Health and Safety at Work Act 1974
• The Management of Health and Safety Regulation 1999
• Provision and Use of Work Equipment Regulations 1998
• Lifting Operations and Lifting Equipment Regulations 1998
• The Climate Change (Scotland) Act 2009 
9 Policy/Guidance
Council Plan 
This Fleet Asset Management Plan identifies how it will contribute to achieving the Council’s
vision ‘To be a North Ayrshire that is Fair for All’ and mission statement “Working together
to improve well- being, prosperity and equality in North Ayrshire.” 
This Asset Management plan outlines our key priorities for the next three years and details
how the Fleet asset will support our people to deliver these.  This plan also gives an overview
of our key actions and the performance indicators that we will use to measure how well we
are meeting the needs of the communities we serve. 
The effective allocation, utilisation, and operation of a well-maintained, fuel-efficient   vehicle
asset fleet, contribute towards many of the deliverables of the Council Plan across all Council
services which include:
• Wellbeing
• Communities and Local Democracy
• Climate Change
• A sustainable Council

Page 24

12 
10 Health and Safety
All vehicles and equipment must be fit for purpose and need to be managed effectively to
support our services and ensure the health and safety of staff, customers, and the wider
community. 
The provision of fleet vehicles and plant which are fit for purpose and provide both an
efficient and safe working environment by meeting all the requirements of our Operator’s
Licence and satisfies all Health & Safety, Legislative and Statutory requirements.
The Transport Hub continues to use telematics in a number of assets to ensure that they are
being used in the most efficient and effective manner. The telematics system reports on a
number of key issues which help monitor the use of the vehicles. These include, total miles,
average daily mileage, non-utilised days, idling time, and driver behaviour events including
speeding. This data can be used to improve utilisation of the vehicles along with driver and
other road users safety.
11 Risk Management 
There are several inherent risks in the operation of the assets and their provision to service
users. These risks are assessed utilising an impact and likelihood matrix to establish the extent
of the risk and to inform the actions required to mitigate the risk to a level such that operations
can be maintained to an acceptable level.
Key Risks
Risk
Likelihood
Rating (A)
Impact
Rating
(B)
Risk
Score
(A + B)
Consequence Current Controls
Extension of
asset beyond
economically
viable life  3  3 
9
 Service disruption
due to increased
breakdowns
 Increased
maintenance
costs
 Loss of
‘Operators’
Licence
 Planned Maintenance
programme
 Timely replacement
programme
Loss of
‘Operators’
Licence  3  3 9  Cannot utilise
transport to
deliver services
 ‘Nil’ defect daily
checklist to be
completed prior to
vehicle use
 Planned maintenance
and inspection cycle
 Driver training
programme
Increased
environmental
controls in
respect of
vehicle
emissions 
3 2
6
 Fleet does not
meet legislative
standards
 Cannot utilise
transport to
deliver services
 Increased costs
to hire in
appropriately
 Timely replacement
programme
 Evaluation of
alternatively powered
vehicles
 Planned maintenance
programmes to ensure
optimum efficiency in
vehicle operation

Page 25

13 
compliant
vehicles.
Significant
increase in Price
of Fuel 
3 2 6  Increase in
budget
requirement
 Speedy implementation
of alternatively powered
vehicles
 Securing of bulk supply
contracts
Securing of Fuel
Supply 
1 5  5
 Essential
Services cannot
be delivered 
 Maintain bulk supply
 Work with Ayrshire Civil
Contingencies Team to
maintain contingency
plan
 Increase the number of
alternatively powered
vehicles to reduce
demand
Insufficient
capital funding to
support the
decarbonisation
of the fleet  3  3 9
 Not meeting the
Scot Gov target
 Increase in
revenue costs
due to retaining
vehicles longer
 Low staff moral
 Increase of
vehicle downtime
 Early engagement within
service reviews
impacting on transport
 Replacement plans re-
phased to significantly
reduce number of
vehicles being replaced 
Effective management and the implementation of actions set out within this plan will enable
these risks to be mitigated and an early warning should further interventions be required.
12 Governance of the assets 
12.1 Plan Management
The Head of Sustainability, Corporate Property & Transport is responsible for management
and control of the plan, and the Transport Manager is responsible for its implementation. 
The agreed actions are reviewed regularly and monitored through the Council’s performance
management system (Pentana). 
12.2 User Input
The assets are provided to enable or facilitate the delivery of a range of Council services. The
requirements of services in the utilisation of these assets, particularly in respect of demand
profiles, vehicle specification and future service development, is collated and agreed and in
turn forms an integral part of the asset management plan and its continued development.
12.3 Elected Members
This Fleet Asset Management Plan will be presented to Members as a component of the
overall Corporate Asset Management Plan.
12.4 Plan Review 
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services. 
13 Service Delivery Aspirations/Challenges

Page 26

14 
National commitments for reduction of transport emissions have been made, with the 2019-
2020 Programme for Government committing to phase out the need for any new petrol and
diesel light commercial vehicles by 2025 and to create the conditions to phase out the need
for all new petrol and diesel vehicles in Scotland’s public sector fleet by 2030.
As part of our ambition to achieve net zero carbon emissions by 2030, the Council had agreed
in 2023 that the purchase of any new passenger and Light Commercial Vehicles (LCVs) will
be zero emission vehicles only, two years ahead of the 2025 target to phase out acquisition
of petrol and diesel versions of such vehicles by public bodies.
This has proven extremely challenging, however, work is already underway in support of
transitioning to zero-emission fleet vehicles and progress has been made in terms of
investment in both EVs (Electric Vehicles) and charging infrastructure. 
13.1 Avoiding the need to travel
The Council’s fleet is engaged in essential service delivery, with a need to travel. However,
there may be opportunities to reduce travel demand, including through digital service delivery
and journey planning for essential travel. 
In terms of staff business travel, we continue to promote sustainable travel, and employees
are reminded to select the best option to meet their business travel needs. The sustainable
travel hierarchy encourages staff to choose the most appropriate solution with the lowest CO2
impact. Staff should continue to be encouraged to choose travel options as close to the top of
the hierarchy as possible. 
13.2 Rationalise the current fleet  
Fleet rationalisation is the process of reducing the size of the fleet to ensure that each vehicle
is used as efficiently as possible. This involves examining the usage of each vehicle and
removing any vehicles that are excess to requirements, reallocating vehicles within the fleet,
and downsizing vehicles. This can provide cost (revenue and capital) and carbon savings as
vehicles are optimised and less vehicles overall need to be leased, purchased, and
maintained. 
The Transport Hub Team continue to critically review the fleet, with an aim of rationalising,
downsizing, and electrifying the current fleet where possible. 
The work of the team contributes to the provision of a wealth of baseline fleet data and
background in support of the ongoing Fleet Decarbonisation work and continue to provide
valuable support throughout the review and the development of the Decarbonisation of Fleet
Working Group.
At each replacement opportunity the team consider in consultation with the relevant service
whether a vehicle is still required, or if it can be downsized through reviewing operational
requirements, carrying capacity and number of seats required. Fleet rationalisation is therefore
a continual part of our fleet management activity. 
The Team continues to support frontline service reviews; this can include service redesign or
transformational projects which can result in a reduction in the number of fleet vehicles. 
13.3 Use of Telematics 
The Council operate a telematics system which is installed in all fleet vehicles.

Page 27

15 
The telematics system provides good quality fleet data which is an essential component to
successfully implement zero emission vehicles. The principal factors to consider when we are
selecting a ZEV (Zero Emission Vehicle) replacement is the daily mileage and maximum range
required, and the opportunities for recharging (usually overnight but also during the day). 
The telematics data is used to help identify potential locations for charging sites. The data
highlights the locations where vehicles are stationary during the day and night along with the
duration that they are stationary for, thereby pinpointing potential locations for charging
infrastructure. 
The data is also used to identify vehicles which are underused. This helps inform our fleet
rationalisation decisions, over whether some vehicles can be removed from fleet, or whether
additional work can be put on them to make them more effective. 
Overall, our telematics system provides us with a clearer picture of how the fleet is currently
being used. This data will make the process of transitioning the fleet to ZEV’s (Zero Emission
Vehicles) easier, as we can match zero emission technology with vehicles, and accurately
plan our charging infrastructure. 
13.4 Switch to low carbon alternatives 
Creating a 100% zero-emission fleet will require the replacement of our current vehicles with
a mixture of different technologies. Currently most ZEVs (zero emission vehicles) are battery
electric vehicles (BEVs) but there are also hydrogen options available. 
The current fleet includes a range of vehicles intended to serve varying purposes, meaning
that some vehicles would be more suited to switching from conventional fuels to electric than
others. Given the current average range limitations of EV batteries, Council vehicles which
currently travel less than 100 miles per day would have the best potential to switch to electric,
397 vehicles have been identified as being immediately suitable to be replaced by electric
vehicle (EV) alternatives. 
Progress has already been made in relation to acquisition of electric vehicles, and we currently
operate 76 EVs, which equates to 17.43% of the suitable fleet vehicles. 
The Council had made a commitment at Cabinet on 30 May 2023 that the purchase of all
future passenger and Light Commercial Vehicles (LCVs) will be zero emission vehicles only,
which was two years ahead of the Scottish Governments 2025 target to phase out acquisition
of petrol and diesel versions of such vehicles by public bodies. This has proven extremely
challenging. 
To inform how we decarbonise other plant (e.g., tractors), the Scottish Government are
undertaking analysis on the ‘Decarbonisation of mobile agricultural machinery in Scotland.’
This will shape the policies to be developed as part of the upcoming Climate Change Plan.
13.5 Charging Infrastructure- Workplace 
In parallel with ZEV adoption, the Council must plan for, and install, suitable charging
infrastructure to support our expanding electrified fleet. This will require a mixture of workplace
and home-based charging, as some vehicles are stored on Council premises overnight, and
others are taken home. 
The Council has set a target through its Electric Vehicle Strategy (2021-2025) to have 80
workplace charge sockets (44 charge points with varying number of outlets) in place by
December 2025.

Page 28

16 
As of July 2025, the Council have installed 41 dedicated workplace chargers (77 sockets) to
support the decarbonisation of our fleet vehicles. The majority of these have been funded
through support provided by the Switched-on Fleets programme which is solely used in the
provision of charge point infrastructure for fleet vehicles.
The Decarbonisation of Fleet Working Group will continue to review the Council’s non-
domestic buildings and fleet mileage data to identify further opportunities to install workplace
charge points. 
The key things to be aware of when designing and implementing a robust charging
infrastructure are:  
• Site constraints - such as the available site electrical capacity and current site demand 
• The duty cycles of vehicles based at the site - how much time they have available to charge 
• The daily mileage requirement of the vehicles based at the site 
• The energy requirement of the vehicles based at the site 
The new generation of EVs boast a significant range on a single battery charge, and there is
unlikely to be a requirement for a ratio of one charger per vehicle. An EV with a 200-mile range
and a daily route of 40 miles would in theory only need recharging once per week, so one
charger could potentially serve five vehicles. 
A system will need to be devised to allow for essential charging, where a vehicle needs a
charge, but a charge point is not available. This could involve either installing a small number
of buffer chargers that are only used for essential charging or advising staff to use public
charge points when available. 
13.6 Heavy Duty Vehicles
The UK Government Decarbonising Transport plan for Heavy Duty Vehicles (HDV) details that
all sales of new medium sized trucks (up to and including 26 tonnes) to be zero emissions
from 2035. with the heaviest (above 26 tonnes) zero emissions by 2040. 
The Council is aiming to achieve the public sector fleet decarbonisation targets, these state
that all HDVs (Heavy Duty Vehicles) are to be zero-emission from 2030. With these targets in
mind, the Energy Saving Trust had been commissioned to produce an HDV-focused fleet
decarbonisation report for North Ayrshire Council. 
There is a growing number of viable zero-emission alternatives, particularly Refuse Collection
Vehicles (RCV), however at present they do have high upfront costs and it is likely that more
viable zero emission replacements options will appear in the next few years. 
Hydrogen is often discussed as a key fuel source in a net zero future. Fuel cell electric vehicles
(FCEVs) use hydrogen to produce electricity, these offer efficient and quiet transport with no
exhaust emissions other than water. If fuelled by hydrogen produced from renewable sources,
they are a true zero emission solution. 
The main advantage of hydrogen over battery electric is its much higher energy density. This
gives hydrogen vehicles a driving range comparable to conventional fossil fuel ICE vehicles.
However, hydrogen fuel cell electric vehicles (FCEVs) are an innovative technology and are
currently at an earlier stage of development than electric vehicles and it is expected that the
range of available hydrogen vehicles to expand over the next few years along with adequate
refuelling infrastructure.

Page 29

17 
In support of decarbonising the existing HDV fleet, an interim agreement was put in place for
the use of HVO (hydrotreated vegetable oil). This offers a short to medium term option for our
HDV fleet where ready electric replacements are not available or would be cost prohibitive.
HVO makes sense, not only because it can deliver up to 90% well-to-wheel carbon reduction
but also because it is a drop-in alternative to diesel.
Budget of £366,000 was secured for a three-year period for the implementation and pilot of
HVO within our Waste collections vehicles; this is currently on-going and it is envisaged that
this will result in a CO2 reduction to the sum of 810 tonnes per annum.
From 2030 onwards the Council will need to consider the procurement of zero emission
HDV’s, these vehicles have the longest life cycles and have the highest potential for CO2e
savings. Were we have HDVs that must be replaced in the short term but have no zero
emission replacement options, we will continue to specify that these are equipped with the
latest Euro 6 diesel engines to help keep our fleet emissions as low as possible. 
14 Performance Indicators 
The service has performance indicators in place to measure the availability and cost of
maintaining assets, these are benchmarked through the APSE (Association for Public Service
Excellence) performance networks.
Indicator 2022/23 2023/24  2024/25 2025/26
(target)
Fuel Use (litres) 1,572,108 1,551,800 1,427,751 1,400,000
CO2 Emissions (tonnes) 3,689 3675 3461 3680
% of vehicles serviced within
7 days of schedule
99 99 99 99
% of vehicles passing DVSA
(Driver and Vehicle
Standards Agency) MOT test
first time 
97.30  96%  98  98 
The following is a list of additional Key Performance Indicators (KPIs) which the Transport Hub
are regularly reporting. The list is not exhaustive and is for the purpose of demonstrating the
types of information that is collected. 
 Vehicle downtime – the number of days’ service lost due to maintenance and repairs.
This allows the Hub to focus on the reasons for an increased figure such as an increase
in vehicle damage or the workshop being under resourced. 
 Vehicle availability – the number of days the fleet was available for use. This is used
to provide information on availability for service demand. 
 Vehicle utilisation – this helps identify whether the fleet is too large or too small. It
can also be used to help with decision making on fleet size and to highlight issues with
staff absence. 
 Number of accidents – this highlights staff training requirements.

Page 30

18 
 Number of vehicle defects – these highlight maintenance issues or how an ageing
fleet is adding to the Councils cost. It can also be used as information for selecting new
vehicles. 
 Number of MOT failures or first time MOT passes – this is used to measure the
performance of the workshop. 
16 ACTION PLAN 
Action
Plan
Reference
Action Desired Outcome Lead Timescale
FAMP A01  Support the EV working and
fleet decarbonisation groups.
Working Group
Established Transport
Hub Ongoing
FAMP A02
The purchase of new
passenger and Light
Commercial Vehicles (LCVs)
will be zero emission vehicles
only.
Reduction of ICE
vehicles and fleet
produced
emissions
Transport
Hub Ongoing
FAMP A03
To undertake further research,
including with the Hydrogen
Accelerator Project and
consideration of HVO as a
potential short to medium term
option for existing heavy fleet
combustion vehicles.
Reduction of fleet
produced
emissions  Sustainability 
March
2026
FAMP A04
Share the findings of our
decarbonisation routemap
with CPP partners to identify
any potential synergies
including in relation to vehicle
charging infrastructure.
Shared working   Sustainability 
March
2026
FAMP A05
Review future electricity
generation proposals and
potential links with charging
requirements at depot
locations. 
Energy efficiency  Sustainability
March
2026
FAMP A06
Review the potential
emerging's from our Digital
Strategy and work with
services
Reduction in
demand for
vehicles and travel
Transport
Hub Ongoing

Page 31

19 
FAMP A07
Review of EV maintenance
costs and develop mechanics
by supporting attendance of
training on electric/hybrid
vehicle systems repair and
replacement
Identify the needs
and ensure the
demands of future
technologies can
be met
Transport
Hub
March
2026
FAMP A08
Review the capital programme
provision for fiscal year
2025/26 onwards to consider
the current £5.19m gap to
further support
decarbonisation requirements.
To meet the
government targets
additional funding
must be made
available
Transport
Hub  March
2026
FAMP A09
Lobby Scottish Government
through existing networks
(including COSLA, SOLACE
and the Sustainable Scotland
Network).
Ensure the
financial burden is
voiced and scope
the potential for
any additional
funding 
Head of
Sustainability
, Corporate
Property &
Transport
Ongoing 
FAMP A10 
Achieve Earned Recognition
operator accreditation from
DVSA
Regulatory
Compliance
Transport
Hub  March
2027

Page 32

HOUSING ASSET MANAGEMENT PLAN

Page 33

1 
Introduction 
The Housing Asset Management Plan (HAMP) has been developed to support and align with the following
strategic frameworks: 
• Delivery of the Council Plan
• The North Ayrshire Local Housing Strategy 2023 - 2028
• The Council’s Housing Revenue Account 30 Year Business Plan (HRA Business Plan)
• Delivery of the Strategic Housing Investment Plan 
The Council is committed to delivering high-quality services within available resources.  The HAMP
provides a framework designed to:
• Aim for full compliance with the Scottish Housing Quality Standard (SHQS) and the 
Energy Efficiency Standard for Social Housing (EESSH/EESSH2), while progressing
towards the new Scottish Housing Net Zero Standard (SHNZS) 
• Align with the Housing to 2040 route map.
• Exceed the standards and outcomes set by the Scottish Social Housing Charter.
• Ensure the Council’s housing stock remains compliant with current and emerging legislation and
standards. 
Housing to 2040
The Scottish Government’s “Housing to 2040” paper outlines a long-term vision for housing in
Scotland and sets out key objectives and strategies to address housing challenges and meet the
needs of the population. Key themes include:
• Vision – the paper envisions an environment where everyone has a safe, affordable, and
warm home that meets their needs and supports their wellbeing.
• Affordable Housing – The Government aims to increase the supply of affordable housing,
including social and affordable rented homes, intermediate housing and low- cost home
ownership options. This will be achieved through increased investment, partnership
working and innovative financing models.
• Energy Efficiency – there is a strong emphasis on improving the energy efficiency of
homes to combat climate change and reduce fuel poverty. The Government aims to ensure
that all homes meet high energy efficiency standards, making them more environmentally
sustainable and affordable to heat.
• Quality & Standards – the paper highlights the importance of delivering high quality homes
that are designed to be accessible, adaptable, and inclusive.
• Place Making – The guidance aims to create thriving and sustainable communities by
considering the broader social, economic and environmental factors that contribute to the
quality of housing areas. This includes promoting mixed- tenure developments, improving
public spaces and enhancing community facilities.
• Housing and Homelessness – the paper recognises the need for a coordinated and
efficient housing system, involving collaboration between the Government, housing
providers and other stakeholders. There is a commitment to the prevention of
homelessness and supporting those in need of social housing, with a particular emphasis
on early intervention.
• Digital inclusion – the Government acknowledges the potential of digital technology to
improve housing services and delivery. It highlights the importance of digital connectivity,
smart homes and data-driven solutions to enhance the quality of housing and improve the
lives of residents. 
Housing to 2040 is an ambitious and comprehensive strategy aimed at tackling  housing

Page 34

2 
challenges, promoting sustainable development, and ensuring  that everyone in Scotland has
access to high- quality, affordable homes that meet their needs. 
The Housing Asset Management Plan (HAMP) reflects several key themes, including:
• The Council’s commitment to applying integrated asset management principles in
relation to its housing stock.
• The importance of maintaining accurate and up-to date stock condition information.
• The robust assessment of future options for underperforming  or obsolete housing 
stock.
• Effective procurement and delivery of investment projects funded through  the
Housing Revenue Account.
Ensure the effective delivery of capital investment, planned maintenance and
response maintenance programmes to maintain housing stock in optimal condition. 
The Action Plan at the end of this document captures the over-arching key
deliverable tasks for the 2025-28 period, with appropriate actions being added,
removed or amended on an annual basis. 
• Aims & Objectives 
The importance of asset management is evident throughout the Council Plan. The HAMP
outlines the priorities for the ongoing maintenance and improvement of the housing stock and is
intended to assist the Council in achieving the vision to have a North Ayrshire that is fair for all
and to achieve our mission of working together to improve the lives of our people in North
Ayrshire. The HAMP has been created to support delivery of several of the key priorities, namely:
Priority - Climate Change 
Key activities 
• Reducing the estate’s carbon footprint through strategic rationalisation, adopting a
locality-based approach and prioritising fabric-first principles alongside low-carbon energy
solutions for homes and buildings.  .
• Developing local low carbon energy generation schemes and networks.
• Working with communities to adopt low carbon behavior change and encourage
climate-based volunteering activities.
• Aligning with future Local Heat and Energy Efficiency Strategies (LHESS) Heat
Networks. 
Priority – Wellbeing 
Key activities
• Using our assets to support wellbeing in local communities.
• Delivering homes for life through our housebuilding programme and wider housing
investments to meet the needs of our residents.  .
• Ensuring the places and spaces where we live, work and visit are well-maintained, inclusive and
accessible for all.   
Priority - Communities and Local Democracy 
Key activities

Page 35

3 
• Developing strong relationships with communities and partners based on trust and
shared aspirations using their experiences to inform service provision.
• Actively support the aims of the Community Planning Partnership and the North
Ayrshire Partnership Plan. 
• Strengthen collaboration with third sector and voluntary organisations.  Ensuring an
inclusive, fair, rights-based and asset-based approach in our work Priority - A Sustainable
Council 
Key activities 
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Using dynamic data and lived experiences to guide informed, evidence-based decision-making.
• Working with partners at national, regional and local levels to secure investment and
target resources towards our strategic priorities. 
The delivery of the HAMP has been developed taking account of appropriate services and
stakeholder groups, including:
• Major Works Working Group
• Recognised Tenant and Resident Groups
• Housing Business Plan Group (HBPG)
• Housing Asset Management Board (HAMB)
• SHIP Project Board 
In terms of effective governance and management of the HAMP, progress against the agreed
action plan will be regularly monitored through the Housing Asset Management Board
(HAMB). 
• Asset Management Systems
North Ayrshire Council has a range of systems to assist in delivering our asset management
strategy. Central to effective stock repair and maintenance is the development of robust and
integrated computer systems to monitor operational service delivery and to enable effective
planning. These tools include:
• A dedicated housing asset management software system (APEX) which contains all
property information relating to the housing stock.
• PMI currently holds detailed stock condition data for 98.5% of our housing stock, collected
through and independent surveying company. A cyclical stock condition survey
programme is in place covering approximately 8% of the housing portfolio each year.  This
approach ensures that data remains current and reflects ongoing investment.  All survey
information is securely stored and managed within our APEX asset management system. 
• An asbestos management database, with portal access for contractors.
• A bespoke gas maintenance system for accurate monitoring of compliance in this area.
• An integrated process that reviews all homes which meet several criteria e.g. hard to let,
significant works required, estate management issues and continuous void turnover.
• A business case process to test in advance the soundness of major capital investment
proposals.
• An informed experienced team of in-house staff to deliver projects within approved
timescales and budgets.

Page 36

4 
These are the tools required to enable the Council to take informed decisions regarding future
investment in housing stock. This investment will ensure that the following outcomes are
achieved:
• Refurbishment of dwellings to ensure they remain attractive, meet modern
requirements and tenant expectations.
• A planned maintenance programme, which looks to achieve best value by
replacing components before they require response repairs.  This proactive
approach anticipates changes in standards and reduces the need for cyclical
maintenance.
• Active cyclical maintenance to prevent deterioration in the physical condition of stock.
• A responsive maintenance service, to ensure that tenants remain satisfied with their
accommodation and to prevent unplanned deterioration in its condition.
• An efficient and effective voids repair service, helping to speed up the repairs process,
protect the Council’s revenue and provide additional stock condition data. 
As per recommended practice and advisory guidance issued by the Scottish Housing Regulator (SHR),
North Ayrshire Council (NAC) aims to review and develop our approach to Integrated Asset Management
(IAM), so that our assets – tenants’ homes – are sustainable and remain fit for purpose in the short, medium
and long term. In this way we can protect the interests of current and future tenants and develop an
integrated approach to asset management within the Council. 
In collaboration between Housing and PMI, a self-assessment was carried out to determine what position
we were in in relation to meeting the criteria of each of the five principles set out in the IAM guidance.
Following that, a robust action plan was developed which highlighted a number of resourcing issues with
regards to being able to meet the criteria and to deliver a RAG status for each of our properties which takes
in to account (but not limited to); property condition; volume and cost of repairs; SIMD data; future
maintenance requirements; demand information and tenancy information. 
Arneil Johnston are the firm who created the IAM guidance promoted by the SHR, and who have since
created a bespoke method of modelling the data from various systems to provide a single dashboard which
provides the relevant asset management performance data and associated RAG status for each property. 
The Council have appointed Arneil Johnson to progress our IAM agenda at pace as the output will provide
invaluable data which will inform other strategic plans and priorities for our housing stock and surrounding
estates. 
• Repairs and Maintenance
• Response Maintenance 
‘Response repairs’ is the term used to refer to day-to-day and emergency repairs e.g. fused
electrical points, burst pipes, broken windows, missing roof tiles, blocked drains etc. To
maintain the housing stock in good condition, tenants are encouraged to report these types of
repairs. The repairs, once reported, are carried out promptly and effectively by Building
Services in accordance with the Repairs Policy.
North Ayrshire Council is committed to continuous improvement in the performance of the
response maintenance service.  We aim to deliver a repairs service that consistently achieves
“right first time” outcomes, ensuring repairs are completed correctly on the first visit, every time.
To ensure that this is achieved the following arrangements are in place:
• Streamlined repairs reporting which includes a dedicated repairs contact centre
which is operational 24 hours per day.

Page 37

5 
• Procedures to accurately identify the nature of the repair when it is reported and
to arrange a convenient appointment.
• Procedures to prioritise the urgency of the works.
• A Tenant Handbook, which advises tenants on how to deal with emergencies, how
and when to report a repair, and further supplementary advice e.g. asbestos, gas
servicing, Right to Repair Scheme, energy conservation etc. The Handbook  also
confirms the duty of tenants to keep appointments for repairs, to avoid abortive and/or
multiple visits by staff.
• Gas Repairs 
The Gas Safety (Installation and Use) Regulations 1998 require that gas fittings and
flues are maintained in a safe condition for tenants and to carry out safety checks for
appliances and flues every year. North Ayrshire Council employs the services of an
external contractor to carry out all gas related works, under the management of PMI. 
Tenants who require a gas repair can report the issue by contacting the Council’s
dedicated repair line.  By following the automated options, tenants will be directed to the
appropriate contractor who will arrange for the necessary work to be carried out.  This
streamlined process ensures that gas- related issues are dealt with promptly and
professionally.  
• Sheltered Housing Units
Within the stock profile, there are 28 Sheltered Housing Units, each of these units is
equipped with specialist systems such as call systems and door entry systems.
Response repairs to these systems are not handled by Building Services but are
managed by PMI, who instruct and oversee the work through specialist contractors to
ensure compliance.
In addition, a significant programme of work is underway to improve the safety of
sheltered housing units, with a particular focus on   fire safety and water quality. 
Progress on this programme is routinely reported to the Housing Asset Management
Board (HAMB). 
• Void Repairs
Void property repairs are the essential works identified following inspection and consider
the properties age, overall condition and any scheduled future improvements.  These
repairs are necessary to bring the property to an agreed lettable standard. 
The Council is committed  to re-letting void properties as quickly as possible. When a
tenant provides notice that they intend to leave their property, an initial pre-termination
inspection is carried out.  This inspection helps identify any required repairs, including
those that the outgoing tenant may be responsible for.  If no repairs are required, the
property proceeds directly to the allocation process.
During the void process our gas maintenance contractor visits the property to isolate
thesupply to allow any void works to be undertaken safely and assesses the condition of the
current system. Before the property is re-let, a full “pre-let” service is completed. 
If repairs or improvements are necessary and cannot be completed during the void period,
the new tenant will be notified of the work that requires to be carried out, and this will be
completed within reasonable timescales.

Page 38

6 
• Planned Maintenance
Planned maintenance covers the replacement of items that are at the end of their useful
life, where the replacement can be predicted and planned for. 
Expected lifespan for main components (reviewed annually) 
Component Expected life
Central Heating (Gas & Elec, ASHP) 15 years
Electrical Rewiring 30 years
Window replacement 30 years
Kitchen 22 years
Bathroom 27 years
Roofing (dependent on roof finish) 43 - 63 years
Rendering 35 years
External Wall Insulation 35 years
Smoke detection 10 years 
Programmes of work are prepared for planned maintenance activities.  These are referred
to as our Capital Programmes, these works are aligned with the requirements of the
Scottish Housing Quality Standard. The Council aims to carry out replacement
programmes cost effectively and with a view to minimising inconvenience to tenants.
Where practical, the Council will group component replacement into packages, with
several components within a property being replaced at the same time.
The external condition of building components and finishes is assessed through an annual
inspection programme carried out by Building Services Officers.  The Council aims to
inspect 25% of our stock each year to ensure that every property is reviewed at least once
within a four-year cycle.
However, emerging operational pressures such as increasing workload, staffing
pressures and changes to legislation can affect the ability to consistently meet this target.
To ensure this programme remains sustainable it will be necessary to review the
resource implications of this frequency.
The findings from these inspections are used to inform an ongoing programme of planned
maintenance works.  The Council aims to carry out as much maintenance work as possible
through planned, rather than reactive approaches.
• Cyclical Maintenance
In terms of both statutory and non-statutory cyclical maintenance our responsibilities are
to ensure that:
• All gas heating systems in the properties are serviced annually and any repairs are
carried out quickly and effectively. Accurate records are maintained of all servicing
and maintenance, and an escalation procedure is in place to ensure access to
properties where the tenants have refused the authorised contractors’ access.

Page 39

7 
• Electrical circuits in properties are checked at least once every 5 years.
• Fire Risk Assessments, where required, are carried out and reviewed at appropriate
intervals.
• Where applicable, fire alarms, emergency lighting and lift installations are checked
and maintained in accordance with the appropriate legislative requirements.
• Smoke alarms work effectively before letting a property to a tenant and that tenants
are aware of their responsibility to report any faulty alarms.
• Annual Portable Appliance Testing (PAT) is carried out in common areas within
sheltered housing units and hostels.
• Lift inspections are carried out at the appropriate intervals, installations are properly
maintained, and repairs are carried out within the required timescales.
• Sprinkler systems are properly maintained, and repairs are carried out within the
required timescales.
• Air-source heat-pump installations are properly maintained, and repairs are carried
out within the required timescales.
In addition to the above, the Council recognises their duty under the Health and Safety at
Work Act to ensure the risk of exposure to the legionella bacteria is properly controlled.
Guidance to fulfil these duties is set out in the HSE Approved Code of Practice ‘L8’. The
Council has implemented the requirements of L8 in terms of sheltered housing units and
flatted accommodation blocks. This includes completion of risk assessments, water
hygiene regimes and undertaking of necessary upgrade works. 
Routine maintenance is recognised as essential to preserve the lifespan of building
components and to maintain the appearance of properties and estates.  The Council is
responsible for maintaining several open areas within its estates, which includes carrying
out grass cutting, tree care and shrub maintenance. 
Funding for estate management activities has been allocated within the Housing Revenue
Account (HRA) 30-year Business Plan.  This includes: 
• upgrading of non-adopted footpaths, roads and lighting to adoptable standard
• provision of additional car parking within estates
• Delivering the Estate Based Regeneration Programme (EBRP), aimed at improving the visual
appeal and overall environment of estates across North Ayrshire 
Asset Portfolio
The Housing Asset Management Plan (HAMP) focuses on the Council’s permanent rented
housing portfolio, including sheltered housing units and supports the delivery of the
Strategic Housing Improvement Plan. At the time of writing, North Ayrshire Council
currently owns 13,414 social housing properties.  these assets are used to provide
accommodation for tenants and applicants registered on the Common Housing register. 
There is a continual demand for suitable housing across North Ayrshire, and the Council
recognises the importance of maximising the use of its housing stock.  This includes
aligning property availability with local demographic needs and ensuring a prompt turn-
around of empty homes to minimise void periods and meet housing demand efficiently.  
The overall valuation of the Council’s housing assets at 31 March 2025 was £533.15 million.
Between 2010 and 2015, the Council invested over £20 million annually to meet the

Page 40

8 
requirements of the Scottish Housing Quality Standard (SHQS).  Since 2015, continued
investment of more than £10 million per year has been committed to maintaining
compliance and ensuring new legislative standards are met.
In addition, the Council has constructed 975 new homes. 
The table below illustrates the net
book value of the Housing Revenue
Account assets
Asset Group
Stock
Numbers
(units)
Amenity Bungalow 641
Bungalow 795
2 Storey House 6,894
4 in Block 2,834
Amenity 4 in Block 3
Tenement Flat 1,069
Amenity Tenement Flat 199
Sheltered Housing 618
Maisonette 253
Multi Storey Flat 66  
NSC Unit 7  
3 Storey House 35
Housing Asset Total 13,414
Net Book Value (with vacant possession) £533.15m 
The table below illustrates the distribution of stock by location and bedroom size:
• Housing Services Stock Breakdown (Location and Bedroom Size) 
Bedsit 1 bed 2 bed 3 bed 4 bed 5 bed 6 bed Total
Ardrossan  248 603 335 55   1241
Barrmill   21 3    24
Beith  209 274 179 15   677
Brodick   27 3 4   34
Chapeltoun,                         
Stewarton   
1    1
Dalry  189 379 148 4   720
Fairlie &
Largs  18 16 15    49
Irvine 40 1,044 1,769 1,116 185 2 1 4,157
Kilbirnie  192 529 389 17   1,127
Kilwinning  282 813 398 54   1,547
Largs 7 186 279 67 6   545
Longbar &
Glengarnock  15 42 10    67

Page 41

9 
Millport   24 5 1   30
Saltcoats  258 573 453 56 1  1,341 
Seamill  1 30           31
Skelmorlie  20 22 4 2   48
Stevenston 3 248 526 701 35   1,513
West
Kilbride  101 85 73 3   262         
Total 50 3011 6012 3900 437 3 1 13,414 
Two-bedroom properties remain the most common size of the stock total, followed by three-
bedroom properties. 
• Stock Condition 
Our housing stock is in excellent condition and is well maintained. We take a proactive
approach to asset management and target improvements to ensure compliance with
both the Scottish Housing Quality Standard (SHQS) and with current and emerging
energy standards, EESSH and SHNZS. Regular investment  ensures our properties 
remain attractive, align with  modern requirements and meet tenant expectations.
To maintain the standard of our properties, the Council delivers a range of planned
maintenance programmes alongside cyclical maintenance activities.  The Council has
robust and comprehensive stock condition information. Stock condition surveys are
available for 98.5% of the housing stock with approximately 8% of our stock subject to a
full condition survey each year. 
The properties are selected based on type/ age and geographical location. Each
property survey assesses the internal and external aspects of the property alongside a
minRDSap energy survey. The survey is carried out by an external Chartered Surveyor
and uploaded from the surveyor’s handheld device to our asset management system,
APEX. The data is validated internally by PMI staff, and each data set of property
information is assessed for compliance with the current energy standards.. The System
is also updated monthly with asset improvements and major repairs completions to
ensure that information is as accurate and relevant as possible. Properties which fail the
standards are highlighted and placed on capital or major revenue improvement
programmes. This information is also used to inform the 30-year business plan and
prepare planned and cyclical programmes of work.
• Performance & Governance 
To accurately track performance in relation to the maintenance and repair of the Council’s
housing stock, PMI and Housing Services report regularly to both internal and external
stakeholders including:
• Housing Asset Management Board
• APSE
• Scottish Housing Regulator (SHR)
• Scottish Housing Network (SHN)

Page 42

10 
• Scottish Government 
The following approaches are incorporated into our working practices: 
• Robust performance monitoring and reporting through the Council’s
performance management system - PENTANA
• Adopt a lean approach to construction design and management
• Robust and regularly reviewed project governance arrangements
• Embrace principles of modern procurement and supply chain management

Page 43

11 
Housing Asset Management Board 
The Housing Asset Management Board (HAMB) was established in 2022 to provide
governance and accountability for expenditure from the Housing Revenue Account. The
HAMB comprises officer representatives from various Council services and covers the
following areas:
• Ensure that policies, procedures, and systems of work are established to comply with all
relevant legislation.
• Monitoring of financial spend across the HRA.
• Regularly review capital programme delivery.
• Escalation of key project decisions.
• Allow cross service discussion on issues relating to future programmes of work.
• Facilitate reporting to Scottish Housing regulator. 
Key themes of the plan are also discussed and agreed at regular forums, including the Joint
Improvement Group and the quarterly Major Works Working Group. 
The Council approves annual budgets for the work to be undertaken under this strategy and
set performance targets to enable monitoring of financial expenditure and service standards. 
Transformation Board 
The Housing Revenue Account (HRA) Capital Investment Programme, revenue budget and
rent levels for recent years highlighted that the HRA was facing future affordability challenges,
primarily due to higher rates of inflation and increased borrowing rates. In order to minimise
the risk of these challenges and keep rent increases sustainable, savings and efficiencies
were identified, and a Housing Transformation Programme was created. 
The programme is governed by the Housing Transformation Board, chaired by the Head of
Housing and Public Protection, and progress is reported regularly to the Council’s Corporate
Transformation Board. The programme is supported by a £2m earmarked fund which allows
for investment in areas such as ICT, digitalisation and resourcing, to support delivery of long-
term efficiencies and service improvement. 
The four key projects being progressed are income maximisation; repairs and maintenance;
void works; and aids and adaptations.
• Legislation 
• Scottish Housing Quality Standard (SHQS)
All social housing in Scotland must comply with a minimum base standard known as the Scottish
Housing Quality Standard (SHQS). This standard is broken into five categories, namely:
• Compliant with the Tolerable Standard.
• Free from serious disrepair.
• Energy efficient.
• Provided with modern facilities and services; and
• Healthy, safe and secure. 
Definitions for each of the five criteria are contained in the Scottish Housing Quality Standard
Technical Guidance published by the Scottish Housing Regulator.

Page 44

12 
In April 2020, the SHQS was revised to demonstrate that in order to comply with compliance
elements 11 and 45, landlords must organise electrical safety inspections at intervals of no more
than five years in line with BS 7671:2018. This was a change from our previous cycle of testing
which was every 10 years and resulted in our SHQS compliance dropping from 99.09% in 2019
to 63.24% in 2022/23.  We have continued to work towards full compliance in this area and are
currently reporting 94% SHQS compliance (24/25 ARC report) 
Achieving full statutory compliance remains a key priority for the Council.  The external condition
and safety of housing properties are monitored through a structured inspection and maintenance
regime. However, gaining access to properties continues to present operational challenges,
which can impact progress. 
To address this, the Council has implemented a range of processes aimed at improving access. 
Progress in this area is regularly reported to the Statutory Compliance Working Group, Council
Members and the Housing Asset  Management Board (HAMB).  In addition, the Scottish Housing
Regulator receives monthly updates detailing our progress and the measures being taken to
overcome access issues and achieve full compliance. 
• Energy Efficiency Standard for Social Housing (EESSH) 
EESSH encourages landlords to improve the energy efficiency of social housing in Scotland
leading to reductions in energy consumption, fuel poverty and the emission of greenhouse
gases. An initial milestone of 31 Dec 2020 was set for EESSH compliance, and a further
milestone (EESSH 2) was set for Dec 2032 whereby all social housing in Scotland would achieve
an energy efficiency rating of EPC band B or above.
The Scottish Government’s twenty-year vision for housing, Housing to 2040, sets out the
commitment to adapt and retrofit existing homes to improve their energy efficiency and
decarbonise their heating, highlighting housing’s contribution to reducing climate change
emissions. The report recognised the need for a review of the EESSH target to be carried out
as part of the commitment to achieve net zero emissions.
In March 2021, the Zero Emissions Social Housing Taskforce (ZEST) was convened by the then
Minister for Local Government, Housing and Planning to explore how Scotland’s social housing
sector could contribute to achieving the Country’s climate change targets.  A key
recommendation from ZEST was to accelerate the review of the Energy Efficiency Standard for
Social Housing (EESSH 2) to better align with Scotland’s net zero emissions goal. 
The EESSH2 Review Group was established in September 2022 to lead this process.  In
response the Scottish Government issued interim guidance in October 2022 which: 
• Paused the 2025 and 2032 EESSH2 milestones, including the requirement that no
property below EPC Band D be re-let after 2025,
• Encouraged landlords to continue investment programmes, with a strong emphasis on a a
fabric-first approach to improve thermal efficiency and reduce heat loss.
• Advised that external funding options should be explored, where possible, to assist with
the delivery of investment programmes.
The Scottish Government launched a public consultation on the proposed Social Housing Net
Zero Standard ( SHNZS) between November 2023 and March 2024.  This new Standard is
intended to replace EESSH2 and provide a clear framework for decarbonising social housing. 
Key proposals under SHNZS include:

Page 45

13 
• A minimum energy efficiency standard to be introduced by 2028, with properties un able
to be re-let should they fail to meet it.
• A new fabric efficiency rating, measured in kWh/m²/year, to guide retrofit planning.
• A phased transition to zero direct emissions heating systems by 2045, with interim
milestones and flexibility for different housing archetypes.
• Tailored approaches for rural, island and non-traditional stock.
The Scottish Government is expected to publish its formal response and technical guidance in
the near future and provide confirmation of the first reporting year. 
At 31 March 2025, 97.6% of North Ayrshire properties achieved or exceeded the current
EESSH standard; however, it is recognised that considerable work will be required to achieve
further  compliance in particular regarding options for decarbonisation of heat. 
We continue to work towards this by implementing energy efficiency measures as part of the
Council’s capital programmes and have a pathfinder project underway, which aims to provide
technical solutions which consider different heating options, fabric improvements and
renewable technologies. This pathfinder project will allow the collation and analysis of real-life
costs and performance information which will inform future business planning.
In addition, a pilot programme was delivered to retrofit 500 Council owned homes with rooftop
solar photovoltaic (PV) systems. This programme supported delivery of financial savings and
reduce fuel poverty for tenants, reduce carbon emissions, and increase energy security.
Following the success of this pilot programme, solar PV is now installed on Council owned
homes as part of the planned annual re-roofing and rendering programmes. Solar PV systems
are also being installed at sheltered housing units as part of the refurbishment works
programme. Our external wall insulation programme ensures that the maximum number of
properties benefit from increased insulation which provides both an energy efficiency measure
and provides benefit to our Tenants in reducing their heating costs.
Our new build programme is also key area in delivering energy efficiency measures, the new
homes being constructed utilise the latest energy efficient technologies including increased
levels of thermal insulation and air tightness, air source heat pumps and solar panels. 
7.3. New Housing Standard 
Sustainability performance remains central to our specification for both new build and existing
stock. The Council’s standard specification for new builds continues to prioritise enhanced
building fabric and Zero Direct Emissions (ZDE) heating solutions, exceeding the minimum
requirements of the current and recently updated Building Standards.
The Scottish Government began consultation on the New Housing Standard in 2021, with the
aim of creating a single legal standard for all homes—private and social—to ensure
consistency in quality, energy efficiency, and accessibility. Following sector engagement, a
draft standard was published in 2023, and legislation is now expected to be introduced. 
Key features of the New Housing Standard include: 
• Uniform minimum standards across all tenures, with no margins of tolerance or
exemptions for sub-standard homes
• A requirement for all new build homes to meet a Scottish equivalent of the Passivhaus
standard, ensuring high energy efficiency, airtightness, and mechanical ventilation

Page 46

14 
• The Scottish Passivhaus Equivalent Working Group, established in 2023, has been
advising on the technical framework. A second consultation on detailed performance
targets and compliance processes is expected in the near future. 
In addition, the Housing for Varying Needs Design Guide is being updated to support the
Scottish Accessible Homes Standard (SAHS), which will apply to all tenures and be phased in
from 2025–2030. This reflects Scotland’s commitment to inclusive design and the changing
needs of its population 
The Heat in Buildings Strategy also mandates that by 2026, all new homes delivered by local
authorities and Registered Social Landlords must be Zero Direct Emissions. 
The Housing Asset Management Plan (HAMP) will be updated in line with further guidance
from the Scottish Government as the New Housing Standard and associated regulations are
finalised.
• Future Demands 
The Council has a strong track record of substantial investment in its housing stock, using
an incremental approach to major element renewal.  This includes a range of capital
renewal programmes covering: 
• Roofs
• External Wall coverings
• Window and door
• Insulation
• Heating systems
• Kitchens and Bathrooms
Renewal is prioritised based on age and condition, this ensures funding is targeted to areas
of greatest need.  This strategic approach supports the Council’s aim of achieving a
consistent standard across all properties in the housing portfolio.
Alongside our capital renewal programmes the Council has several revenue funded
programmes for both reactive and planned maintenance covering: 
• Tenant reported repairs
• Repairs to void properties
• Scheduled maintenance activities 
This approach of capital renewal and revenue maintenance ensures that the housing
stock remains safe, energy efficient and meets tenants needs, whilst aligning with the
longer term sustainability and compliance standards. 
While the Council remains committed to maintaining and improving its housing stock, there
are circumstances where individual properties may no longer meet strategic requirements
and may be considered for disposal or regeneration.  This can be due to factors such as
poor condition, low demand or being unsuitable for adaptation or retro-fit measures.  In
these cases, a robust evaluation and assessment is undertaken, guided by integrated
asset management principles, to determine the most appropriate action.  Stock
regeneration programmes include options for new build developments, refurbishment and
demolition.
Demand for Council Housing continues to be high; however, it is recognised that there are
areas of unpopular stock. Ongoing work is focused on understanding and addressing the

Page 47

15 
factors that influence demand for specific house types and locations, ensuring that options
considered align with wider Council priorities , including sustainability accessibility and
community regeneration. 
In the current economic climate, delivering new build homes, undertaking refurbishment
projects and sustaining capital and revenue investment programmes is financially
challenging.  As part of the Housing Revenue Account (HRA) Business Planning process,
the following are considered: 
• Affordability of investment programmes
• Impact of future rent levels
• Long-term asset performance
• Compliance with current and emerging national standards, such as SHQS, SHNZS
and New Housing Standard. 
By embedding integrated asset management principles such as lifecycle costing, demand
forecasting and option appraisal informed decisions can be taken that maximise value,
support tenant needs and ensure that the housing stock is responsive to future challenges.
• Sheltered Housing Unit Refurbishment Programme 
The need for high quality, accessible housing for older people is recognised within the Council’s
‘Older People’s Housing Strategy’. The Housing Revenue Account budget approved by Council
provides in the region of £40m  investment in our Sheltered Housing Re-provisioning
Programme. This allows us to continue improving our sheltered housing portfolio and ensure
Council complexes within North Ayrshire are high quality, energy efficient and meet tenants’
needs and aspirations. 
Eleven properties not already refurbished or redeveloped through the SHIP programme were
identified and following a review of the property lifecycle data for these units, Barnett Court in
Saltcoats and Cheviot Court in Irvine were selected as the first two to be progressed.
The programme involves the full refurbishment of the Units, including new heating systems,
windows and external doors, installation of Solar PV, upgrade of the door entry and CCTV 
systems, external works including external insulation if appropriate, additional car parking and
EV charging infrastructure. 
As of 2025 works have been completed at both Barnett Court and Cheviot Court and works
are expected to commence at the next two programmed units, Laigh and Vineburgh Courts in
early 2026.  Design works are progressing at the remaining units. 
Estate Based Regeneration Programme (EBRP)
The Estate Based Regeneration Programme (EBRP) forms a key part of the Council’s broader
approach to community regeneration.  It was developed in response to the aspiration to invest
further in our estates, targeting areas affected by low-demand housing stock, antisocial behavior,
poor external appearance, inadequate parking provision and deteriorating infrastructure such as
roads, footpaths and general grounds maintenance. 
The Council has committed to investing £10 million in our housing estates between 2019-
2029.  The investment programme seeks to provide communities where residents are proud to
live and to safeguard them for future generations. 
• Recent examples of work undertaken by the EBRP inc. Nursery Place, Ardrossan –
Demolition of low demand housing, site to be used for new build housing (2024/25)

Page 48

16 
• Renewal of footbridge, Girdle Toll – Upgrade and replacement of wooden footbridge
(2024/25)
• Innes Park Road, Skelmorlie – Provision of in curtilage parking to alleviate parking
pressures (2024/25)Bimson Place, Irvine – Rear gardens cleared and fenced, low
maintenance chips and rotary dryers installed, and pathways upgraded. ( 2023/24)
• Glass Fronted Closes, Irvine – 12 glass screens replaced, including installation of
ramped access and creation of bin storage areas. (2023/24)
• Dirrans, Kilwinning – creation of in-curtilage parking to 26 properties to alleviate
parking pressures (2022/23)
• Keppenburn Avenue, Fairlie – creation of in-curtilage parking to alleviate parking
pressures. (2022/23) 
In addition to enhancing the overall environment, the projects also offer solutions for addressing
dis-repair in mixed tenure blocks.  These blocks are often in poorer condition due to some
owners being unable or unwilling to contribute to common repairs.  To support progress in this
area, the PMI factoring team actively engages with owners to facilitate and coordinate common
repairs, helping to overcome barriers to investment and improve the condition of shared assets. 
• Multi Story Blocks
In June 2018, the Council’s Cabinet approved the demolition of the Fullarton Tower Blocks in
Irvine and for the major refurbishment of the Saltcoats Tower Blocks.  The demolition of the
Fullarton blocks was completed in January 2024 and the site will be used as part of  the SHIP
programme to provide new build housing consisting of general needs housing, amenity
bungalows and accessible homes. 
Refurbishment works at Saltcoats, with an investment value of ££4.64m, were  completed late
2024.  These works have delivered significant improvements for residents, including internal and
external upgrades such as upgraded central heating systems, rewiring and the installation of fire
suppression systems.  Kitchens and bathrooms were also replaced in properties where these
components were due for renewal within five years of the commencements of internal work. 
The final phase of the refurbishment will involve the replacement of the lifts in both blocks.  This
project commenced in August 2025 and will further contribute to the long-term sustainability and
functionality of the buildings.
• New Build Housing 
In-line with North Ayrshire Council’s Strategic Housing Investment Plan 2026-31 we continue to
design, develop and deliver a new supply of affordable and sustainable housing for rent. The
Council's current housing development programme is on target to deliver a committed 1666 new
homes by March 2031. 
The table below outlines new housing supply that has been developed or is in the process of
being developed by the Council: 
Project Completion
Date
No. of
Units
Housing Mix
Copeland Crescent, Millport 2013 12 Amenity and Wheelchair
Liveable Bungalows

Page 49

17 
Redstone Avenue, Kilwinning 2014 46 General Needs, Amenity and
Wheelchair Liveable Homes
John Galt PS, Irvine 2015 80 General Needs, Amenity and
Wheelchair Liveable Homes
Stevenston Institute, Largs 2015 11 Amenity Flats
Dickson Drive Phase1, Irvine 2015 8 General Needs Homes &
Amenity Bungalows
Vennel Gardens, Irvine 2015 16 Sheltered Housing Unit
Montgomerie Court, Kilbirnie 2017 24 Sheltered Housing Unit &
Amenity Bungalows
Fencedyke, Irvine 2017 35 General Needs, Amenity and
Wheelchair Liveable Homes
Glencairn House, Stevenston 2018 28 Sheltered Housing Unit
Kyleshill Court, Saltcoats 2019 36 Sheltered Housing Unit
Dickson Drive Phase 2, Irvine 2020 24 General Needs, Amenity and
Wheelchair Liveable Homes
Ardrossan Road, Seamill 2019 31 General Needs, Amenity and
Wheelchair Liveable Homes
Watt Court & Bessie Dunlop
Court
2020 49 Sheltered Housing Unit,
Supported Accommodation, 
Wheelchair and Amenity
Homes
St Beya Gardens, Millport 2021 18 General Needs, Amenity and
Wheelchair Liveable Homes
Dalrymple Place, Irvine 2021 33 Sheltered Housing Unit and
Amenity Bungalows
Springvale Place, Saltcoats 2021 14 General Needs, Amenity and
Wheelchair Liveable Homes
Flatt Road, Largs 2021 123 Sheltered Housing Unit,
Supported Accommodation,
General Needs, Amenity, and
Wheelchair Liveable Homes
Towerlands, Irvine 2022 50 General Needs, Amenity and
Wheelchair Liveable Homes
Brathwic Terrace, Arran 2022 34 General Needs, Amenity and
Wheelchair Liveable Homes
St Michael’s Wynd, Kilwinning  2022 79 Sheltered Housing Unit,
Supported Accommodation,
General Needs, Amenity, and
Wheelchair Liveable Homes
St Colm’s Place, Largs 2022 29 Sheltered Housing Unit
Caley Court, Stevenston 2023 16 Supported Accommodation
Harbourside, Irvine 2023 71 Sheltered Housing, General
Needs, Amenity, and
Wheelchair Liveable Homes
Afton Court, Stevenston 2023 6 Amenity Bungalows
Former Largs Police Station,
Largs
2023 12 Amenity Flats
Former St Mary’s School,
Largs
2025 26 General Needs and Amenity
and Homes
Former Stanecastle School,
Irvine
2025 31 General Needs, Amenity and
Wheelchair Liveable Homes

Page 50

18 
Former James McFarlane
School, Ardrossan
2025 19 General Needs, Amenity and
Wheelchair Liveable Homes
Laburnum Avenue &
Newhouse Drive
2025 14 General Needs and Amenity
Homes
Kings Arms, Irvine 2026 6 Amenity Flats
Former Garnock Academy,
Kilbirnie
2026 50 General Needs, Amenity and
Wheelchair Liveable Homes
Nursery Place, Ardrossan 2027 6 General Needs, Amenity and
Wheelchair Liveable Homes
Grange Court, Stevenston 2027 6 General Needs Homes
Ayrshire Central, Irvine 2027 202 General Needs, Amenity and
Wheelchair Liveable Homes
Fullarton Street, Irvine 2028 43 General Needs, Amenity and
Wheelchair Liveable Homes
St Michael’s Wynd (Phase 3),
Kilwinning
2029 46 General Needs, Amenity and
Wheelchair Liveable Homes
Montgomerie Park, Irvine 2029 188 General Needs, Amenity and
Wheelchair Liveable Homes
Bourtreehill Village, Irvine 2029 32 General Needs, Amenity and
Wheelchair Liveable Homes
Redburn Grove, Irvine 2030 16 Gypsy/ Travellers Site
Guthrie Road, Saltcoats 2030 7 General Needs Homes
Corsehillhead, Kilwinning 2028 TBC 7 General Needs and Amenity
Homes
Former James Reid School,
Saltcoats
2029 TBC 46 General Needs, Amenity and
Wheelchair Liveable Homes
Regeneration Project 1d 2029 TBC 36 General Needs, Amenity and
Wheelchair Liveable Homes

Page 51

19 
• Island Housing 
The Council is committed to supporting our island communities. 18 new homes were
completed on the Isle of Cumbrae during summer 2021. The site provided a mixture of
general needs houses, amenity bungalows and homes for wheelchair users.
The Council also completed 34 new homes at Brathwic Terrace on the Isle of Arran
during June 2022. The site provided a mixture of general needs houses, amenity
bungalows and homes for wheelchair users. 
Island properties are subject to the same asset management approach as mainland
properties, with reactive and annual maintenance being the responsibility of Building
Services who have emergency arrangements in place with local island-based
contractors. 
These developments, alongside collaborative work with communities on the island, are
anticipated to stimulate investment in other infrastructure (transport, marine, digital) to
encourage economic growth. 
The Council has established the Arran Housing Task Force (AHTF) to quantify demand
for affordable housing on Arran and identify issues that may be limiting economic
growth. A quantitative study was undertaken to determine affordable housing demand
on the island, recognising the assessed housing demand information from the North
Ayrshire Housing Register and community feedback. Following the study, the AHTF
recognised areas that required further analysis, and the Arran Housing Survey was
developed and launched on 31 January 2025. The survey looked for responses from
Arran households, employees/employers on the island, landlords, second homeowners,
empty homeowners, short-term let owners, and those wishing to move to the island, to
help shape future housing provision on the island. Following the survey closure on 14
April 2025, the results are being analysed by the Council’s Housing Strategy Team and
will then be presented to the AHTF with an action plan to reflect the outcomes. The
AHTF membership includes the Scottish Government, Highlands and Islands Enterprise,
local community groups, and Arran registered social landlords. 
A post has been funded within the Council’s Housing Strategy Team from the income
from the reduction in discount for empty and second homes Council Tax in North
Ayrshire to support the work of the AHTF and the delivery of the Rural and Islands
Housing Action Plan.
• PMI Support services
• Tenant Alterations & Improvements
The Council permits tenants to carry out certain alterations to their homes provided they
have sought our permission. Tenants must apply in advance, providing details of proposed
works. This applies to any changes that they may wish to make within the property,
external decoration or the erection of structures in outdoor spaces.  Minor internal
decoration does not require formal permission. Information on the permission process is
available in the Tenant Handbook and online.  Consent will not be unreasonably withheld,
provided the proposed works meet all relevant standards and comply with any conditions
set by the Council.  It is the tenant's responsibility to secure any necessary statutory
approvals before commencing work.
If alterations are carried out without permission, tenants may be required to apply

Page 52

20 
retrospectively or, in some cases, restore the property to its original condition.  Where a
tenant is unwilling or unable to do so, the Council may recover the costs associated with
reinstating the property.
• Medical Adaptations
One of the Council’s key objectives is to support independent living, enabling tenants to
remain in their homes as long as possible. The Council carries out alterations to tenanted
properties to enhance the quality of life for elderly or disabled tenants.  These are initiated
following an assessment by an HSCP Occupational Therapist, who identifies the
necessary modifications based on the tenant’s needs.  Adaptations are then prioritised in
line with the Ot’s recommendations and carried quickly as possible subject to funding
constraints.
Adaptations range from minor, low-cost adaptations , such as handrails and shower seats,
to more substantial works like ramps, wet rooms and extensions.  PMI contributes to the
programme by offering architectural and technical support to HSCP, particularly for larger
and more complex adaptations in Council- owned homes.
Where feasible, new build and refurbished properties are designed with flexible features
that allow for easy future adaptation, ensuring homes can evolve with residents’ changing
needs.
• Asbestos Management
Asbestos containing materials were widely used in the construction industry prior to the
year 2000. Any housing stock built or refurbished before this date may have asbestos
containing materials within its construction.
North Ayrshire Council is committed to managing work activities involving asbestos
containing materials to reduce the likelihood of asbestos fibers becoming airborne.
Where any construction works are carried out on behalf of North Ayrshire Council within
the housing stock, that building is deemed a workplace under the Health and Safety at
Work Act. These work activities are therefore subject to health and safety legislation
including the Control of Asbestos Regulations 2012.
It is current policy at North Ayrshire Council that no Council employee will work on any
asbestos containing materials. Where asbestos containing materials are identified the
Council will arrange for a specialist contractor to carry out removal or other appropriate
work. This applies to both licensed and non-licensed asbestos work as defined by the
Health and Safety Executive.
To ensure safe working practices, North Ayrshire Council uses an electronic database
for recording its housing asset asbestos information. Access to this database can be
provided securely to contractors.
North Ayrshire Council appoints competent UKAS accredited contractors to conduct surveys.
• Management Survey: The purpose of the management survey is to manage
asbestos-containing materials (ACM) during the normal occupation and use
of premises.
• Refurbishment / Demolition Survey: The refurbishment / demolition survey is
required where the premises, or part of it, need upgrading, refurbishment, or
demolition.
It is Council policy to carry out management surveys on all Council housing stock,
however this may not always be possible due to access difficulties.
At the time of writing, the Council has asbestos information recorded for 98.7% of its
housing stock with 174 no accesses. The housing stock figure includes 1061 post 2000

Page 53

21 
builds which will not contain ACMs and do not require survey information to be held.
Refurbishment surveys are conducted when existing information is insufficient.
Carried out by UKAS-accredited surveyors, these surveys are tailored to the specific
scope of works and are subsequently uploaded to the asset management system.
Management plans are in place for all common areas within the Council housing
stock, in line with Health and Safety Executive (HSE) recommendations.  These
plans are reviewed and updated annually through a rolling programme of re-
inspection to ensure ongoing compliance and safety. 
As of the latest update, NAC has 387 internal common areas covered by these
management plans.  This proactive approach supports the Council's commitment to
maintaining safe and well managed communal spaces across its housing portfolio.
• Property Factoring
Right to Buy legislation resulted in the sale of approximately 12,000 homes to sitting
Council tenants within the North Ayrshire locality. Of these, around 1,665 properties still
owned by NAC share communal areas with privately owned homes, typically in flatted
developments or four-in-a-block style houses.   
At the time of sale, the Council retained legal rights and responsibilities for the
management and maintenance of these communal parts.  To fulfil these obligations, the
Council acts as the Property Factor, a legal role that enables it to coordinate and deliver
necessary repairs and maintenance across shared spaces. The Council has the legal  duty
of being the Property Factor to enable it to perform these duties.
The Property Factors (Scotland) Act 2011(the Act) aims to protect homeowners by
providing minimum standards for Property Factors. All provisions of the Act came into force
on 1 October 2012 and apply to all residential property and land managers whether they
are private sector businesses, Local Authorities or housing associations. 
The Act has three main elements:
• A compulsory register of all property factors operating in Scotland
• A code of conduct that sets out minimum standards of practice with which all
registered property factors must comply
• A new route for redress: the Housing & Property Chambers First Tier Tribunal.
Homeowners will be able to apply to the tribunal if they believe that their factor has
failed to comply with the code of conduct or otherwise failed to carry out their
factoring duties.
To comply with the terms of the Act, the Council employs a dedicated property Factoring
Team.
The Factoring Team has developed and implemented the processes required to comply
with the terms of the Act. In line with the requirements of the legislation, the Factoring
Team have produced a Written Statement of Services which is issued to all property
owners and subject to regular review.
Future development of the Factoring Service is a key action as it will improve the service
provided to the owners of our factored properties as well as generating future revenue
income for the Council.

Page 54

22 
The Factoring Team handles a significant volume of enquiries each year, with referrals
being received from a variety of sources.  These include homeowners, tenants, repairs line
and Building Services, among others.  This multi-channel approach ensures that issues
related to communal areas and factoring responsibilities are identified and addressed
promptly, supporting effective property management across mixed tenure blocks.
During 2022, the Team recorded approximately 276 approaches and since then there
has been a year on year increase with 403 service requests recorded in 2024. Most
cases raised lead to the completion of essential repairs. Please note that these figures do
not consider approaches for general advice and assistance where referrals may be made
to other services. In financial year 2022-2023, a total of 180 owners were invoiced for
repairs to a total value of £135,432.50 (including administration fee & VAT).  In the
financial year 2024-2025 a total of 256 invoices were issued to factored property owners
at a value of £233,310.62 (including administration & VAT).  This upward trend in service
requests and invoicing reflects increased engagement and demand for factoring
services, highlighting the importance of continued investment in staffing, systems, and
communication to support service delivery. 
The Scottish Government are currently in the process of reviewing the role of Property
Factors across the sector and have established three key areas for change. Proposals are
currently in early stages of development however may lead to significant development of
the Factoring Service in future years.
• Financial Summary 
All works undertaken on the Council’s housing assets are funded from the Housing
Revenue Account or the Housing Capital Programme. The primary source of funding is
rental income from residential properties, which generates approximately £60.247m
annually.  An additional income of around £0.474 million is derived from commercial
interests, including retail units and lock-up garages.  Furthermore, capital receipts totaling
£0.097 million were received from the sale of Housing Revenue Account assets during the
period 2021-2025. 
Although the Council’s housing stock is currently in very good condition, ongoing
investment is required to ensure that it continues to perform as an effective asset. To
support this, a 30-year Business Plan has been developed to ensure that the appropriate
level of funding is available to finance repairs and future investment in all stock. Each year
projected expenditure, including maintenance and investment requirements are reviewed,
and the Business Plan is updated accordingly to reflect the required income levels over
the Plan’s duration.  
Stakeholder engagement is a key part of this process.  The updated Business Plan is
shared with various stakeholders, and tenants are consulted on proposed rent changes. 
Their feedback is incorporated into a report presented to Council for consideration of the
current Business Plan projects future investment to March 2055. It is reviewed annually to
ensure alignment with the Council’s strategic priorities and is informed by the most recent
condition survey data. Additional factors such as the cost of living and pressures on rental
income are considered during the development of the Business Plan. 
The investment costs for the period between April 2025 and March 2026 and projected
investment costs identified for the period between 2026 and 2055 are detailed below.
These costs include all anticipated works required to ensure that properties are maintained

Page 55

23 
at or above the required standards.
Projected investment required during period April 2025 to March 2055: 
Cost Category 2025/26 2026/30 2031/35 2036/55 TOTAL £m
Improvements to Existing
Stock  16,140,903  97,002,383  114,419,774  958,535,645  1,186,098,705 
New Build Projects  29,330,853  99,119,218  -  -  128,450,071 
Void Costs  3,987,190  19,454,831  27,214,613  149,637,028  200,293,662 
Responsive Repairs  8,449,724  36,125,407  50,305,344  264,661,178  359,557,368 
Planned & Cyclical
Maintenance  6,407,206  27,816,516  43,283,462  264,661,178  342,170,361 
Infrastructure
Improvements  431,441  1,862,749  2,660,565  15,610,250  20,565,005 
Aids & Adaptations  1,791,750  6,644,142  8,087,320  32,349,280  48,872,492 
Total £m  66,539,067  288,027,246  245,971,078  1,685,470,273  2,286,007,664 
• Risk Management
The Council is committed to adopting best practice in the identification, evaluation, and cost
control of all risks to ensure that they are eliminated or reduced to an acceptable level.
At both strategic and operational levels, the Council recognises that the management of its
housing stock does have several identifiable risks.
• Building cost inflation and rising tender prices
• Shortages of materials and supply chain issues
• Capacity within the construction industry
• Technology changes, particularly in relation to heating options and energy standards
• Impact of future legislative changes
• A landscape of increasing regulatory and statutory compliance requirements
To mitigate risks, several key controls have been developed. These are summarised as
follows:
• Major new build Projects 
The SHIP project board is in place to oversee the preparation, review, financial
management and overall delivery and implementation of the Council’s housing
development programme. The Board will be the final decision makers in terms of priority,
budget (including approval of additional spend), site housing matrix and design concept sign

Page 56

24 
off for each project site.
• Major Capital Projects 
These projects have dedicated monthly project boards and are reported bi-monthly to the
Housing Asset Management Board (HAMB), where issues of concern and risk mitigation
are standard agenda items. 
The operational aspects of major capital projects are also reported and any risks relating
to the delivery are discussed.
• Other Major Works and Revenue Repair Projects 
The operational aspects of other major works and revenue repair projects are reported
monthly to the HAMB, with a risk register being maintained and reviewed as part of this
process.
• Dedicated professional technical staff.
• Ongoing and progressive training 
Over-arching key risk and mitigations are noted below: 
Key Asset Risk Mitigation(s)
Ageing asset stock impacting
on condition
• Cyclical condition surveys
• Cyclical component replacement programmes
• New build programme (SHIP) 
• SHU refurbishment programme
• Saltcoats High Flats refurbishment programme
• Responsive repairs service
Statutory Compliance /
Safety
• Statutory compliance programmes (Gas safety /
EICR / Smoke detection upgrade)
• Governance and reporting procedures (HAM
Board, Annual Return on the Charter, Cabinet
reporting).
• Responsive repairs service
• 
• Dedicated compliance section within PMI
• Robust application of No Access Policy
• Condensation Damp and Mould Strategy
and reviews process being developed
• Statutory compliance working group established
Climate Emergency / EEESH
/ EESH2 / SG Heat in
Buildings Strategy
• Council’s Sustainability and Climate Change
Strategy
• Whole house energy efficiency pilot project
• Energy Efficiency investment programmes
• New build programme (SHIP)
Investment requirements
exceeding budget availability
• Best value procurement of external contractors
• Long term business planning model and rent-
setting
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)

Page 57

25 
Increasing regulatory
demands
• Engagement with Information networks (APSE /
ALACHO / SHOPs etc.)
• Long term business planning model and rent-
setting
Staff resource to respond to
increasing demands
• Resource structure within PMI team being
reviewed
• Process for gaining access to people’s homes
regularly reviewed 
• Staff training and development
Systemic issues within
construction industry supply
chains
• Quality standards within tender documents to
ensure appropriate contractors are appointed
• Governance and reporting procedures (SHIP
Board, HAM Board, cabinet etc.)
Uninsured perils • Risk based assessment on identified properties ie
subsidence. 
• Insurance
The Council’s housing assets are insured through a reputable provider with considerable
experience in local authority insurance. The Council is committed to adopting best practices in
risk identification, assessment, and cost control to ensure risks are either eliminated or
mitigated to an acceptable standard. 
Subsidence related material damage to properties is excluded by our insurers coverage.  the
Council self-insures for such incidents, with repairs to affected housing stock funded directly
from the HRA.    There is also an excess that the Council must pay for each insured risk. 
As a result of the insurance exclusion for subsidence the Council aims to mitigate the risk
through the correct management of dwellings known to be at risk of subsidence. PMI are
working towards development of a process for the risk-based assessment of stock identified to
be within subsidence areas or identified through condition survey. This will require allocation of a
dedicated budget to allow mitigation of future risk. 
• Action Plan
The Housing Asset Management Plan (HAMP) reflects the Councils commitment to delivering
high-quality, affordable housing which not only complies with legislation but also meets the
expectations of tenants and stakeholder groups.
To support delivery of HAMP objectives , a detailed action plan has been developed.  This Action
Plan is reviewed and updated annually to reflect completed actions and include new priorities
arising from legislative changes or evolving strategic aims.
Progress is tracked through the Housing Asset Management Board (HAMB), with escalation to
the Executive Director (Place) and the Executive Leadership Team as required.

Page 58

26 
2025 - 2028 Action Plan
The following actions have been identified as the Housing Asset Management
Plan improvement actions for 2023-28 and will be recorded on the Council’s
performance management system, Pentana 
Operational Actions
HAMP
ACTION
DESCRIPTION DUE
DATE
MANAGED
BY
EXPECTED
OUTCOME
R/A/G
COMMENT
HAMP_A01     Ensure 100%
compliance with
SHQS (excluding
exemptions and
abeyances) is
achieved
31 March
2026
Laurence
Cree
Ailean Watt  
GREEN   Q1 2026
SHQS - 
HAMP_A02                     Ensure 100%
compliance with
EESSH (excluding
exemptions and
abeyances) is
achieved
31 March
26
Laurence
Cree
Ailean Watt  
GREEN   Q1 2026
EESSH - %
EESSH2 - %
At this time we
are still reporting
under previous
EESSH targets
as recent
government
guidance around
EESSH2 is under
review as per
October 22
guidance. 
HAMP_A03     Work with Housing
Services to
develop and deliver
regeneration
projects.    
31 March
2026
Laurence
Cree
Ailean Watt      
GREEN PMI continue to
provide technical
guidance and
procurement
assistance in
relation to
regeneration
projects .

Page 59

27 
HAMP_A04   Work with Housing
Services to
develop and deliver
projects contained
within the Strategic
Housing
Investment Plan 
31 March
2026
Laurence
Cree
Alison
Diamond      
GREEN Key areas 2026
Fullerton Dev, Irv
Nelson St, Largs
Former Ayrshire
Central site,
Irvine 
HAMP_A05 Further enhance
the property
factoring services
within North
Ayrshire that are
focused on
encouraging owner
occupier uptake
with major planned
and capital
investment works
31 March
2026
Laurence
Cree
Ailean Watt    
AMBER Discussion on-
going. 
HAMP_A06 Continue with the
annual programme
of percentage
stock condition
surveys and upload
all necessary
attributes,
condition, life
expectancy and
cost information to
the Asset
Management
System (Apex)
31 March
2026
Laurence
Cree
Ailean Watt
GREEN Q1 2026
98.5% of stock
has been
surveyed.
HAMP_A07 Upgrade existing
smoke/heat/and
CO detection in
housing stock
31 March
26
Laurence
Cree
Ailean Watt  
GREEN Programme to
complete
outstanding
Smoke detection
within properties
has been
completed. 
Ongoing
programme being
delivered as
capital
programme

Page 60

28 
HAMP_A08 Work with Housing
Services to
develop and deliver
projects contained
within the Estate
Based
Regeneration 10
year Programme
31 March
2026
Laurence
Cree
Ailean Watt  
GREEN Projects for
completion in yr
have been
identified and
scoping and
design work is
underway.

Page 61

ASSET MANAGEMENT PLAN 
ICT     
2025 – 2028 
Version  Owner  Date 
1.0 Senior Manager IT   28/07/2025

Page 62

2 
CONTENTS          PAGE 
1  Introduction          3 
2  Aims & Objectives            3
3  Asset Types          4
4  Review of ICT Asset Management Plan 2021-2024    5 
5  Activities/Approach identified in ICT Asset Management Plan 2025-2028     7
6 Overview and List of our Key ICT Assets      10
7  Current Asset Management Performance/Drivers for Change   12 
8  Asset Management – Key Focus       13 
9  Future Service Delivery Aspirations / Challenges & Investment  15
10 Key Strategic Actions        17

Page 63

3 
1. Introduction
This ICT (Information and Communications Technology) Asset Management Plan 2025-2028
updates and supersedes the previous 2021 – 2024 Plan. This 3 Year Asset Management
(ITAM) Plan outlines a structured approach to managing the lifecycle of IT assets across the
organisation, including hardware, software and related infrastructure. The Plan aims to
optimise asset utilisation, ensure compliance, control costs and support operational efficiency.
ITAM is a critical enabler of the broader IT Technology Strategy. By aligning asset
management with strategic goals such as digital transformation, cyber security, cloud adoption
and sustainability, the organisation ensures that its technology investments are fully utilised
and future ready. This plan provides the governance, visibility and control necessary to support
informed decision making, risk mitigation, and ongoing innovation over the next three years.
North Ayrshire Council’s approach to Asset Management Planning is based on CIPFA
guidance.
In relation to Governance, the Information Technology Manager is responsible for
management and control of the ITAM Plan, which will be reviewed annually. The IT
Architecture Board acts as the assessment and approval body for all IT investment and
change.
2. Aims & Objectives
Effective ITAM is essential to delivering the priorities outlined in the Council Plan including
wellbeing, educational attainment, sustainability and adapting to climate change. By ensuring
that all IT assets are efficiently procured, maintained and retired, the Council can control costs,
improve resilience and support the transition to smarter, more responsive public services. 
By ensuring equitable access to reliable and secure technology, ITAM enables frontline
services and schools to deliver digitally inclusive support that promotes health, learning, and
opportunity for all residents – enabling better outcomes for residents and communities across
North Ayrshire. 
Additionally, through responsible procurement, lifecycle management, and environmentally
conscious disposal of IT assets, the Council contributes to its climate change and sustainability
goals – minimising electronic waste, reducing energy consumption and fostering a greener,
more resilient digital infrastructure.
The importance of IT Asset Management is evident in the Council Plan 2023-28 Priorities.
Priority – Wellbeing
Key Activities
• Using our assets to support wellbeing in local communities
• Improving educational attainment and achievement and closing the attainment gap
• Developing infrastructure to support business growth
Priority – Communities and Local Democracy
Key Activities
• Accessible public services, both digitally and locally, ensuring a ‘No Wrong Door’ approach

Page 64

4 
Priority – Climate Change
Key Activities
• Reducing the carbon footprint of our estate through rationalisation
• Promoting a circular economy in North Ayrshire through reuse, repair and recycling
Priority - A Sustainable Council
Key Activities
• Driving change and transformation, using technology where appropriate, to deliver efficient
and effective services and support delivery of priorities.
• Maximising value from the use of our assets.
• Focusing our investment on priorities.
• Using dynamic data and lived experiences to inform decision-making. 
3. Asset Types
An effective ITAM Plan encompasses a wide range of asset types to ensure full visibility,
control, and optimisation of the Council’s technology environment. Including all relevant asset
types is essential for managing risk, ensuring compliance, supporting strategic priorities (such
as service delivery, Sustainability, and cost efficiency), and enabling timely decision-making.
Each asset plays a role in maintaining continuity of operations and aligning IT capabilities with
organisational goals.
All IT asset types have, to some extent, clearly defined strategies for their delivery and
management which are summarised within this document along with high level commentary
regarding the asset base.
The asset base and scope of this document includes:
1. End User Devices:
• Laptops
• Desktops
• Tablets
• Smartphones
• Peripherals (eg monitors, keyboards, printers) 
2. Networking Equipment
• Switches
• Routers
• Firewalls
• Wireless Access Points (WAPs) 
3. Data Centre and Server Infrastructure
• Physical servers
• Virtual servers
• Storage devices (SAN; NAS)
• Backup and disaster recovery systems

Page 65

5 
4. Software Assets
• Operating systems
• Productivity and collaboration tools (eg M365)
• Business-critical applications
• Licences and subscriptions
• Cloud based services and platforms
5. Telephony and Communication Systems
• VoIP systems
• Handsets and headsets
6. Cloud and Virtual Assets
• Cloud infrastructure 
• Virtual desktops
• Software as a Service (SaaS) applications
7. IT Security Assets
• Endpoint protection
• Encryption tools
• Authentication systems (eg MFA)
8. Audio Visual Equipment
• Video conferencing systems
9. Assistive Technology
• Assistive technology
• Devices supporting specific service areas (eg HSCP, Libraries)
10. IT Consumables and Accessories
• Cables
• Docking Stations
• Batteries and Chargers
By managing these assets proactively throughout their lifecycle – from acquisition to
disposal – The Council can reduce waste, improve efficiency, and continue to support
evolving service needs and strategic objectives. 
4. Review of IT Asset Management Plan 2021 – 2024
Provides an overview on progress on activities/approaches included within the
previous IT Asset Management Plan
Over the past three years, there have been ongoing changes to, significant progress in, and
persistent challenges for the way in which IT assets are deployed, developed and utilised
across the organisation. These developments reflect shifting business needs, rapid
technological advancements and an evolving landscape of digital infrastructure and cyber
security concerns.

Page 66

6 
The key aspects have been:
4.1 Always On VPN (AOVPN) Implementation
The deployment of the Always On Virtual Private Network (AOVPN) has significantly
enhanced remote working capabilities across the organisation. Staff working from home or
other non-corporate locations now benefit from seamless, secure, and reliable access to
corporate systems and resources. This solution not only supports business continuity and
flexible workstyles but also strengthens the overall security posture by ensuring encrypted
connections and consistent policy enforcement regardless of location.
4.2. Corporate PC Replacement Programme (PCRP)
The ongoing Corporate PC Replacement Programme (PCRP) continues to drive
standardisation across desktop infrastructure. By deploying modern, high-performance
hardware equipped with the latest Windows 11 operating system, the programme ensures
improved device performance, enhanced security, and simplified management. This strategic
approach maximises device lifespan while maintaining a high standard of usability and
supportability, aligning with long-term digital transformation goals.
4.3. Microsoft 365 Adoption and Collaboration Tools
Significant investment in the Microsoft 365 suite has resulted in its widespread adoption as
the Council’s primary platform for communication and collaboration. Tools such as Outlook
and Microsoft Teams have transformed internal and external engagement, enabling more
agile, responsive, and collaborative working practices. The ongoing migration of file storage
from traditional network drives to SharePoint is delivering substantial benefits in terms of
document accessibility, version control, and collaborative editing. The successful migration of
all users from personal H Drives to OneDrive has been completed, with continued progress in
transitioning shared network drives to SharePoint, further enhancing information governance
and accessibility.
4.4. Agile Working and Office Rationalisation
The shift to Agile working, accelerated by the COVID-19 pandemic, has become a permanent
feature of the Council’s work culture. Many staff who were previously office-based now operate
in a hybrid or fully remote capacity. This transition has been supported by strategic office
rationalisation, including the closure of underutilised buildings and the co-location of teams. IT
Services has responded by enhancing remote support capabilities and upgrading office WiFi
infrastructure to ensure fast, reliable, and cable-free connectivity for mobile devices and
laptops.
4.5. Wide Area Network (WAN) Enhancements
The completion of the Wide Area Network (WAN) upgrade has delivered significant
improvements in connectivity across numerous Council sites. Schools, in particular, have
benefited from increased bandwidth and faster internet speeds, supporting the growing
reliance on digital tools and online resources in teaching and learning environments. These
enhancements are critical to delivering modern, technology-enabled education.
4.6. Local Area Network (LAN) and WiFi Upgrades
Upgrades to the Local Area Network (LAN) and WiFi infrastructure have enabled a more
efficient and streamlined network environment. The rationalisation of LAN switches, driven by
the increased use of wireless connectivity, has reduced hardware complexity and improved

Page 67

7 
energy efficiency. Standardised network hardware across corporate and educational settings
has also enhanced security, simplified management, and improved the user experience.
4.7. Corporate Telephony Modernisation
The successful upgrade of the corporate telephony system, including the transition to Session
Initiation Protocol (SiP) trunks, has modernised voice communications across the
organisation. This shift has reduced dependency on the legacy analogue telephone network,
which is scheduled for decommissioning in the near future. The new system provides a more
scalable, cost-effective, and future-proof solution for voice services
4.8. Education ICT Asset Management
A dedicated operational group comprising IT Services and Education staff continues to refine
and implement best practices in the management and disposal of ICT assets used by teachers
and pupils. Regular meetings ensure alignment with evolving needs and standards. The group
oversees the device refresh cycle, supported by the Education ICT capital programme,
ensuring that educational environments are equipped with up to date, fit-for-purpose
technology. 
5. Activities/Approach identified in ICT Asset Management Plan 2025 – 2028 
5.1 People at the Core
Deliver first class technical solutions built around the needs of our customers and
people.
The technology that IT Services introduce will be designed in partnership with Services across
the Council and will support business processes, service delivery and collaboration. ICT
assets will be aligned to the needs of the Council’s workforce, moving to more unified
applications and to single standardised devices.
5.1.1 Progress up to 2024
• Enhanced remote support for agile workforce.
• Investment in device replacement to support continued agile working.
• Deployment of softphone functionality and reduction in the number of desktop handsets.
• Deployment of M365 platform to education, seamless communication, modern desktop
applications for our teachers increasing learning in our schools 
5.1.2 Future Focus for 2025 - 2028
• Redesign telephony creating a telecoms ecosystem fit for our people and their agile work
style 
5.2 Anytime Anywhere Access
Enable colleagues to access the systems applications and information they need
wherever they are
The Council workforce must have reliable and timely access to the systems and applications
required to effectively deliver services and support customers, service users and the broader

Page 68

8 
community as efficiently as possible. IT Services will continue to lead developments and
security around AOVPN, allowing users easy access to systems from wherever they chose to
work
The PCRP will help to ensure that staff have up to date laptops of the required spec and
performance to support agile working.
5.2.1 Progress up to 2024
• Migration of users away from VDI to AOVPN, providing improved and simplified remote
access technology. VDI will only be used as an exception and where absolutely necessary.
• Investment in the Desktop estate to replace older models and support a continued move
to Laptops rather than PCs (Personal Computer). 
• Ability to access M365 apps such as Teams and Outlook on personal devices 
5.2.2 Future Focus for 2025 - 2028
• Ongoing investment in the Laptop / Desktop estate through the PC Replacement capital
programme, refreshing hardware and standardising on the latest operating system.
• Migrate remaining users away from VDI to a Microsoft Remote Desktop Environment,
ensuring continued access and improved cyber-security for non-standard users who
cannot utilise AOVPN
• Implement compliance rules for mobile phones managed by Microsoft Intune ensuring old
out of date devices have no systems access 
5.3 Cloud First
Utilise cloud-based technologies where appropriate - new cloud-based systems should
be considered provided they represent good value.
Migrating the Council’s business application and software assets to the cloud would
significantly reduce the requirement for physical server hardware and storage at the Council’s
primary and business continuity sites. Business applications hosted in the cloud will be highly
available and business continuity will be seamless.
Cloud adoption will necessitate the ongoing transformation of the ICT network from a
traditional design to an internet centric network which will be more scalable and more
sustainable.
5.3.1 Progress up to 2024
• Adoption of a Move to Cloud where appropriate approach when procuring new applications
or renewing contracts.
• Through the ICT Architecture Board cloud-based application opportunities are reviewed
and considered. 
• Implementation of a new Cloud IT Service Management system (ITSM)
• Implementation of a Cloud managed WiFi solution. 
• Implementation of a Cloud-ready Telephony solution.
• Move from primary storage being on network drives to One Drive and SharePoint Online

Page 69

9 
5.3.2 Future Focus for 2025 - 2028
• Implementation of a cloud CRM solution to replace on-premise solution. This will be
integrated with the existing cloud telephony solution.
• Implementation of a cloud HSCP case management system, replacing an on-premise
solution.
5.4 Data Driven
The insight gained from data analytics will support service delivery and inform how we
manage ICT technology assets.
Making use of data and technology for transformational change to provide insights and
solutions to enable the Council to improve efficiency, reduce costs, and make data-driven
decisions, resulting in better outcomes for our citizens.
5.4.1 Progress up to 2024
• Complete renewal and enhancement of NAC website providing customers with improved
channels of access to Council services.
• Continued to leverage investment in PowerBi for provision of Management Information
(MI) and reports to assist with service provision, review, and enhancement.
• ETL tool called FME used to integrate HR data with Active Directory, significantly
improving the Starters, Movers, and Leavers process. 
5.4.2 Future Focus for 2025 - 2028
• Creation and roll out of a Manager’s Workforce Information Toolkit using Power BI and
FME. This will show structure level information in relation to HR and in future iterations will
include Financial and IT resources.
• Use of Power BI to improve efficiency of computer and finance related internal audit
processes.
• Use of council data to create a Poverty Dashboard to help target resources to those most
in need. 
5.5 Secure
Operate securely whilst still taking advantage of technological innovations and
opportunities.
Cyber security is paramount for the Council, and we take a proactive approach to protecting
assets while also being prepared to respond to any security incidents which may have an
impact upon them. 
5.5.1 Progress up to 2024
• Implementation of SecOps Password Policy Tool to enhance protection of Council data by
blocking weak passwords and securing user authentication
• Implementation of Tenable Vulnerability Management software to improve management
of server-side vulnerabilities
• Training, awareness, and governance methods have all been revised to ensure the
development of a healthy security culture at all levels of the organisation.

Page 70

10 
• Engaged with the Digital Office and security vendors for options to establish a Security
Operations Centre (SOC) function capable of detecting and responding to security events
and moved towards procurement of a service 
5.5.2 Future Focus for 2025 - 2028
• Procurement and Implementation of Security Operations Centre (SOC) for a three-year
period and building a business case to establish future budget to continue service.
• Extension of enhanced vulnerability management capabilities to Council’s endpoint estate.
• Engagement with vendors of existing security tooling to maximise utilisation of available
functionality.
• Continue with Business Continuity and Cyber Incident Management planning and regular
testing to ensure staff and Services can deal with major incidents.
• Continuous focus on technologies, processes, techniques, and staff training to counter the
ever-present threat of sophisticated cyber-attacks. 
6. Overview and List of our Key ICT Assets
ICT assets, used by approx. 6,500 staff and approx. 22,000 school pupils, are
displayed in the tables below. 
Asset (Hardware)  Nos 
Estate 
Replacement
Value 
Refresh & Replacement  Method of Monitoring 
PCs & Laptops
3,000
Corporate 
9,500
Education 
12,500 Total 
£4.8M 
Desktop Replacement
Programme 
Education ICT
Replacement Programme  
Microsoft System Centre
Configuration
Manager (SCCM) and Intune
are used to monitor and
manage devices. In addition,
Education & Skills
monitor devices by inventory
at school level    
Tablets/iPads
(Education) 3,500 £950K  
Schools iPads are managed
via a central
console using Airwatch
mobile device management
and inventories are held at
individual schools. 
Servers & Storage  40 £900K
Virtualised server
technology is in place
decreasing the number
of physical servers
required. 
VMWare and CommVault
management tools 
Microsoft SCCM software 
SolarWinds monitoring
software.
Contract reviews
LAN (Local Area
Network) Switches 
WiFi Access Points
440 
11,200
£1.35M 
£325K
Contract
in place for replacement and
upgrade of Local Area
Network (LAN) hardware
and WiFi Solution
Asset monitoring and
maintenance using Extreme
XiQ management tools and
SolarWinds monitoring
software.
Contract reviews

Page 71

11 
Mobile Phones / Smart
phones 4000 £800K
Contract in
place with Vodafone for mob
ile and smart phones 
Vodafone Online Account
IPT Telephony
Handsets 1200 £230K Contract in place for Fixed
Voice / IPT Cisco Call manager (CUCM)
Printers (MFDs -
(Multifunctional
Devices))
Maintained
by Services 
MFDs are on
lease
agreement 
Devices are leased by
individual Services. Contract
in place with RICOH 
RICOH provided account
information 
Asset (Software)  Nos  Estate Replacement
Value 
Refresh &
Replacement 
Method of
Monitoring 
Microsoft Licences (Corporate)
Main Licences 
M365 - 3,130 x E3
Licences: Corporate
Staff 
&
M365 –1340 x xF3
Licences: Care at
Home Staff 
SQL Licences 
Data Center Server
Licences 
£740K per annum 
£38K per annum 
£42K per annum 
Ongoing Microsoft
M365 agreement 
MS Licence
database 
Microsoft Licences (Education)
Campus A365
Licences:
1,866 Staff 
22,000 Pupils   
£92K per annum  Ongoing Microsoft
Campus agreement
MS Licence
database

Page 72

12 
Asset (Rentals) Nos  Annual Rental
Cost 
Refresh &
Replacement 
Method of
Monitoring 
Data Circuits  160 £440K per annum
Contract in place for
replacement and
upgrade of Wide
Area Network
(WAN) data circuits 
Capita Managed
Service 
7. Current Asset Management Performance/Drivers for Change
7.1 How we manage our ICT Assets
Outlines how we manage our ICT assets and associated infrastructure.
7.1.1 Inventory and Performance Monitoring
ICT asset inventory and performance are proactively managed using a suite of enterprise-
grade tools:
• Microsoft System Centre Configuration Manager (SCCM) and Microsoft Intune
are used to manage and monitor the corporate and Education estate of Windows-
based personal computers and servers. These tools provide real-time visibility into
hardware and software configurations, enabling efficient patch management, software
deployment, and compliance monitoring.
• SolarWinds Network Performance Monitor is employed to oversee the health and
performance of the Council’s core network infrastructure, ensuring high availability and
rapid fault detection.
• Jamf Pro is used to manage the fleet of iPads within the Education estate, providing
centralised control over device configuration, app deployment, and security
compliance. 
7.1.2 Lifecycle Planning
IT Services is committed to ensuring that all ICT assets are sustainable, cost-effective, and
aligned with service delivery needs throughout their lifecycle. Key principles include:
• Procuring assets that are affordable and supportable within agreed capital and
revenue budgets.
• Developing and maintaining asset roadmaps and replacement schedules to support
continuous improvement and operational efficiency.
• Supporting services with the secure and compliant retirement and disposal of ICT
assets, in line with data protection legislation and environmental standards. 
7.1.3 Risk Management
As ICT assets age, they present increasing risks in terms of performance degradation, security
vulnerabilities, and compatibility issues. To mitigate these risks:
• A structured programme of ongoing maintenance and proactive replacement is
maintained.
• Older equipment is assessed regularly to determine its impact on service delivery and
total cost of ownership.
• Replacement planning is prioritised to ensure that critical systems remain resilient,
secure, and capable of supporting evolving business needs.

Page 73

13 
7.1.4 Support and Maintenance
The Council’s ICT estate is supported through a combination of automated tools and skilled
technical teams:
• SCCM and Intune are used to manage updates, enforce security policies, and deploy
software across Windows laptops, desktops, and smartphones. These tools ensure
devices remain compliant with corporate standards and are protected against
emerging threats.
• Extreme Networks’ XIQ Cloud platform is used to manage network switches and
WiFi access points, enabling centralised configuration, monitoring, and firmware
updates.
• SolarWinds continues to provide deep insights into network performance, helping to
identify and resolve issues before they impact users. 
7.1.5 Refresh and Replacement Strategy
ICT asset refresh and replacement is guided by the Council’s 10-year Capital Investment Plan
(2021/22 – 2030/31), which provides a long-term framework for planning and budgeting. Key
considerations include:
• Desktop and Laptop Devices: Typically refreshed on a 5-year cycle to ensure
performance, security, and compatibility with modern applications.
• Network and Telephony Infrastructure: Reviewed regularly, with typical
replacement cycles ranging from 5 to 7 years, depending on technology evolution and
operational requirements.
• Software and Licensing: Evaluated continuously to ensure alignment with service
needs, vendor support lifecycles, and cybersecurity best practices. 
8.    Asset Management – Key Focus
8.1 Comprehensive Asset Information Management
The Council is committed to maintaining a complete, accurate, and accessible record of all
ICT assets. This commitment underpins the effective management, security, and optimisation
of the Council’s technology estate. To support this, comprehensive asset management
information is systematically collected, maintained, and stored in a secure and efficient
manner, ensuring it is readily available to authorised personnel when required.
Key Practices Include:
• Centralised Asset Repository: All ICT asset data is recorded and maintained within
the Council’s IT Service Management (ITSM) system, which serves as the single
source of truth. This system is accessible to all relevant ICT staff and is regularly
updated to reflect changes in asset status, location, and ownership.
• Integration with Management Tools: The ITSM system is integrated with desktop
and mobile device management platforms such as Microsoft SCCM, Intune, and Jamf.
This integration ensures real-time visibility of hardware specifications, software
installations, and compliance status across the estate.
• Lifecycle and Roadmap Tracking: Detailed records are maintained for each asset’s
lifecycle, including procurement dates, warranty periods, and planned replacement

Page 74

14 
timelines. Vendor roadmaps are also tracked to align asset refresh cycles with product
support and innovation timelines.
• Contract and Licensing Oversight: A structured programme of contract review and
re-procurement is conducted in collaboration with Procurement Services. This ensures
that all ICT assets are supported by valid contracts and licences, and that renewals
are aligned with operational needs and budgetary planning.
• Data Accuracy and Governance: Regular audits and reconciliations are carried out
to ensure the accuracy of asset records. Governance processes are in place to
manage data quality, user access, and compliance with relevant policies and
regulations.
• Operational Readiness: Asset data is used to support operational planning, incident
response, and capacity management. Accurate asset information enables faster
troubleshooting, more effective support, and informed decision-making. 
8.2 Centralised Procurement and Contract Management
To ensure consistency, efficiency, and cost-effectiveness:
• Centralised Purchasing: All ICT hardware and software acquisitions are coordinated
through IT Services to ensure alignment with technical standards and strategic goals.
• Contract Register: A centralised register of all IT Services contracts is maintained,
with clearly defined budgets for annual licensing, support, and maintenance.
• Budgetary Control: Dedicated budget lines are established for recurring ICT costs,
ensuring transparency and financial planning.
• Architecture Board: An ICT Architecture Borad is established which reviews requests
for significant new systems, applications and software to ensure these are fit for
purpose, fully integrate with existing systems and meet the highest cyber security
standards. 
8.3 Strategic Use of Procurement Frameworks
The Council leverages national procurement frameworks to ensure legal compliance and best
value:
• Framework Utilisation: Scottish and UK Government frameworks are the preferred
procurement routes for ICT goods and services.
• End-User Devices: PCs, laptops, tablets, and mobile phones are typically procured
through Scottish Government frameworks.
• Enterprise Solutions: Larger-scale hardware and software solutions are sourced via
Scottish Government SVARS, Crown Commercial Services, or the G-Cloud 14
catalogue, ensuring competitive pricing and robust contractual terms. 
8.4 Rigorous Testing and Change Management
All new ICT solutions undergo thorough evaluation to ensure they meet technical and
operational requirements:
• Defined Roles and Responsibilities: Customer Support and Operational teams
share responsibility for testing and deployment.

Page 75

15 
• Change Management: Standardised change control processes are in place to assess,
test, and approve all significant changes to the live environment, minimising disruption
and ensuring system integrity. 
8.5 Cost Optimisation and Operational Efficiency
The Council actively seeks to reduce ICT operational overheads and maximise return on
investment:
• Contract Reviews: Regular reviews are conducted with Procurement Services to
ensure contracts remain competitive and aligned with service needs.
• Software Rationalisation: Standardising on Microsoft 365 and other core platforms
has streamlined operations and improved user experience.
• Eliminating Redundancy: Duplicate or overlapping software functionality is identified
and removed during procurement and renewal cycles, as well as during infrastructure
upgrade projects.
8.6 Backup, Recovery, and Business Continuity
Robust backup and disaster recovery arrangements are in place to protect critical systems:
• Comprehensive Backups: All business-critical systems are backed up regularly, with
secure storage and recovery protocols.
• Secondary Data Centre: A geographically separate data centre provides resilience
and continuity for key services.
• Connectivity Redundancy: Diverse internet connections ensure continued access in
the event of primary link failure.
• Ongoing Review: Backup and storage strategies are kept under review in response
to building rationalisation and evolving infrastructure needs. 
8.7 Information Security and Compliance
The Council maintains a strong focus on information security, ensuring the confidentiality,
integrity, and availability of systems and data:
• PSN Compliance: Annual assessments and accreditations ensure compliance with
the Public Services Network (PSN) requirements.
• Cyber Security Initiatives: Ongoing efforts include:
o Enhancing protective monitoring capabilities.
o Evaluating the benefits of cyber insurance.
o Implementing additional controls aligned with the Scottish Government’s Cyber
Resilience Framework.
o Implementation of a Manged SOC (Security Operations Centre) Service.
• Policy and Governance: Security policies and technical architectures are regularly
reviewed and updated to reflect emerging threats and best practices. 
9. Future Service Delivery Aspirations / Challenges & Investment 
9.1 Future Development – 2025-2028
• Investment in Microsoft M365 to support the roll-out of Windows 11 across the desktop
estate.
• Investigation and piloting of Microsoft Co-pilot to support productivity and improve
automation of routine tasks.

Page 76

16 
• Investment in the network to improve internet access and simplify web-filtering
• Investment in the network to increase bandwidths to support system and cloud
application access
• Ongoing investment in Telephony to support and sustain agile working
• Ongoing data centre replenishment including replacement of core switches; upgrade of
back-up and recovery solution. 
• Reduction in capacity requirements over time through migration of corporate files and
data to Microsoft Sharepoint in the cloud
• Investment in Data Centre locations to future proof and ensure cost-effective and
sustainable solutions.
• Develop our Manged SOC Service to ensure ongoing protection against cyber-attacks.
9.2 Capital Investment
ICT Capital Investment Arrangements and 10 Year Investment Strategy 
• Highlights key areas of expenditure across ICT asset types along with the mechanisms in
place for project investment inclusion within the Capital Plan.
• Significant capital investment and associated budget movements relating to IT assets are
reported on a regular basis to the Capital Programme and Assets Group (CPAG). This
ensures appropriate governance, transparency, and alignment with strategic priorities
across the Council’s capital programme.
• IT Services has a current Capital programme 25/26 - 30/31 in place totalling £5.20M whilst
Education has a Capital programme totalling £5.41M over the same period, enabling the
Council to continue to develop its ICT assets. The table below details the key technology
areas of budgetary spending. 
• Over the next three years there will be investment in a wide range of projects to enhance
and improve the use of assets, enabling the reduction and replacement of legacy hardware
and applications, enhancing network and internet connectivity and providing increased
performance of the Council’s ICT assets.
• The current 10 Year Capital Plan commenced 21/22 running to 30/31 and has 6 years
remaining. The Plan will be revised and refreshed over the year ahead to provide a new
10-year horizon. 
CURRENT ICT 10 Year Capital Programme 
Years remaining – 25/26 to 30/31 
Investment
Areas 
25/26 
£
26/27 
£
27/28 
£
28/29 
£
29/30 
£
30/31 
£
Total
Capital
£
ICT
Investment
Fund 
484,858   557,100   648,900 282,600   282,600   297,600   2,538,658  
WAN 
(Wide Area
Network) 
500,000            500,000 
LAN
(Local Area
Network)
& WiFi     
1,500,000          1,500,000
Telephony  650,000       650,000

Page 77

17 
Schools ICT
Investment 
1,203,908   1,203,908   752,000   752,000   752,000   752,000   5,415,816 
10. Key Strategic Actions 
Action
Plan
Reference
Action Desired
Outcome
Lead Timescale
ITAMP 1 PCRP –
Corporate 
Corporate
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed 
Carolann McGill Ongoing - 
five-year
replacement
cycle
ITAMP 2 PCRP -
Education 
Working
strategically
with Education,
the schools
Desktop estate
is regularly
refreshed to
ensure that
most up to date
and secure
versions of
hardware and
software are
deployed
Carolann McGill  Ongoing - 
five-year
replacement
cycle 
ITAMP 3 Managed SOC
Implementation 
Implementation,
embedding as
BAU and
preparation of
Business Case
to secure
budget 
Gavin Alston March 2026 
ITAMP 4 ITSM Asset
Management 
Build a
Corporate
Software Asset
Register to
support
inventory and
rationalisation
of Application
assets
James McNeil  December 2025

Page 78

18 
ITAMP 5 Data Centres Establish
strategic
options for
relocation of
Primary and
Secondary Data
Centres 
James McNeil  September
2025 
IT AMP 6 Digitisation of
Telephony 
Complete the
migration of
analogue to
digital for all
phone and
broadband
lines.
BT timescale
now January
2027.
Carolann McGill  January 2027

Page 79

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
ASSET MANAGEMENT PLAN 
OPEN SPACE

Page 80

2 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
1. Introduction 
The Open Space Asset Management Plan (OSAMP) sets out the Council’s approach for the
management and maintenance of all open space assets. This plan complements and should
be read in conjunction with the Open Space Strategy 2016 - 2026.
Streetscene’s approach to Asset Management Planning is based on the guidance given by
CIPFA in their document “A Guide to Asset Management Planning and Capital Planning in
Scottish Local Authorities” which has been endorsed by the Scottish Government. CIPFA
updated the guidance and published ‘A Guide to Local Authority and Public Sector Asset
Management’ in November 2020. North Ayrshire Council’s governance of Asset
Management Planning was approved on 29 March 2011. 
2. Aims & Objectives 
The Open Space Asset Management Plan identifies how it will contribute to ‘Our Council Plan
2023 - 28’ to help achieve the Council’s vision ‘A North Ayrshire that is fair for all’ and mission
of ‘Working together to improve the lives of our people in North Ayrshire.’ 
The effective and efficient management and maintenance of the Council’s open space assets
contributes towards the Council’s priorities of:
• A Sustainable Council
• Climate Change
• Wellbeing
• Communities and Local Democracy 
The key objective of the OSAMP is to ensure the Council’s assets are fit for purpose and
managed effectively and efficiently. 
The Council’s open space assets provide a valuable resource for people to enhance their
wellbeing through being active in their communities, connecting with nature, and connecting
with their communities. They also present an opportunity to attract visitors to the area and
make North Ayrshire an attractive place to stay. They are also key to supporting the delivery
of the North Ayrshire Nature Network, halting bio-diversity loss, regenerating eco-systems
and storing carbon.
Open Space can be defined as:-
‘Any open space which provides, or has the potential to provide, environmental, social
and/or economic benefits to communities, whether direct or indirect, within and around urban
areas. It can include greenspace and hard landscaped areas with a civic function, as well as
aquatic open spaces’.

Page 81

3 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
3. General Description of Assets 
Type of Asset Number / Size
/ Area
Purpose / Use
Local Parks 14 These are areas which are well maintained for
public enjoyment of the natural heritage and the
provision of formal and informal recreation
opportunities.
Country Park 1 Provides an opportunity for all to participate in
outdoor activities such as walking, cycling, horse
riding and fishing. It also provides an inspirational
educational environment giving an opportunity to
those wishing to learn about history, geography and
the natural world.
Cemeteries and Burial
Grounds 
45 To ensure we have the capacity to bury the dead
in a well-managed and safe environment. To meet
our statutory obligation to maintain these sites
some of which are of historical significance both
locally and nationally.
War Memorials and
Monuments
37 (23 War
Memorials and
14
Monuments)
We will repair and protect our war memorials and
monuments. In accordance with the War Memorial
(Local Authorities Powers) Act 1923.
This power extends to the alteration of memorials
to commemorate the fallen of any conflict.
Civic Spaces Information not
available
Maintain the existing public realm/civic space and
support the development of existing and new sites
in line with the Local Plans and the Town Centre
Regeneration Strategies. By doing this we will
stimulate and develop our towns and villages
thereby promoting economic prosperity.
Trees and Woodlands 275 hectares Woodlands are managed in accordance with North
Ayrshire Council’s Tree & Woodland Management
Policy (2012). The Council’s Tree Planting Strategy
aims to plant 108,000 new trees by 2030.
Hedges and
Hedgerows
110,340 linear
metres
Hedges & Hedgerows act as green barriers to
roads and create a habitat for native flora and
fauna.
Allotments and
Community Gardens
4 Encourage local communities to develop allotments
and community gardens. We have community
groups actively pursuing allotment sites.
Sports Areas
(including sports
pitches, tennis courts,
putting greens and
bowling greens)
59 By continuing to improve sports areas both natural
and non-natural surfaces we will encourage
residents and visitors to participate in sport.
Play Areas (including
MUGAs)
106 play areas
9 MUGAs
(31 additional
play areas
within schools)
Providing safe and accessible opportunities for
children to play. By promoting and encouraging the
use of open space for play and adventure we
create an opportunity for children to become active
and healthy.

Page 82

4 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Benches including
picnic benches  
1,338 For general seating purposes to enable people to
take a rest or to sit to read, take in a view or have a
picnic safely. Bench type and design is influenced
by the location and its purpose.
Litter bins and dog
waste bins
1519 and 601 To enable our residents and visitors to comply
with the law when disposing of litter and dog waste
and promoting responsible behaviour. Both types of
receptacles enable our streets to remain free of litter
and dog waste thus creating healthy attractive
environments.
Planters 137 To provide floral displays to enhance our towns and
civic amenity spaces. 
Railings and Bollards
Information not
available
To prevent or restrict movement across a boundary
for safety reasons. Some fences are decorative
and serve not only as a boundary but enhance a
park or landscape feature including war memorials.
Water courses and
Water Bodies
38 Our rivers and inland waters offer a range of
opportunities for non-motorised water-based
activities and wildlife. The water courses are
managed as per North Ayrshire Council’s Water
Safety Policy (2021).
Promenades 5 Used by residents and visitors for exercise and
general recreation.
Beaches 16 North Ayrshire has an extensive coastline that is
used for a wide range of outdoor activities as well
as educational purposes. 
The above nature-related assets also provide important habitats for a wide range of plants and 
animal life and are crucial for supporting biodiversity. 
A Data Management Review process has been created to record inventory data, storage,
updating and validation, to ensure all changes to assets are accurately recorded. 
4. Current Performance / Drivers for Change 
The following documents are produced to support the asset management process and are
reviewed and regularly updated.
Open Space Strategy 2016 - 2026
This will deliver through partnership working, open spaces that are inclusive, accessible and
‘fit for purpose’ enhancing the quality of life for residents in North Ayrshire and visitors to
North Ayrshire. This was approved by the Cabinet on 22 November 2016.
The 6 key strategic objectives of the Open Space Strategy are:
• Open Space will be promoted as a resource for tourism and recreation, economic
development & biodiversity.
• Help reduce local inequalities by ensuring that all communities have access to high

Page 83

5 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
quality, well equipped clean and safe open space.
• Promote better health by providing diverse opportunities in open spaces, the natural
environment and countryside for physical exercise, sport and recreation.
• Protect and enhance all areas of nature conservation value, in particular historic
features, sensitive habitats and special landscapes.
• Improve the perception, quality and range of recreational and tourism facilities in the
open space areas.
• Respond to climate change through the delivery of a connected and integrated 
Open Space Asset Management Plan – records the service standards for each asset
group, identifies risks, and reflects local requirements, customer preferences and current
investment strategies.
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data.
Performance Reports – Local Environmental Audit and Management System (LEAMS). 
5. Condition and Suitability 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long- term benefit of the asset.
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers. Asset management
provides a framework for this process by identifying and prioritising needs across the open
space as a whole. Lifecycle planning is used to minimise whole life costs to ensure efficient
and effective use of resources.
Customer Focus – takes into account the needs and expectations of customers is
addressed by developing appropriate levels of service for each asset and incorporating a
Participatory Budgeting approach for part of the ground’s maintenance activities.
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its open space and associated infrastructure.
Environmental factors contribute to the demands placed on the Open Space asset
management.
Climate change – changeable weather conditions with severe weather extremes are
becoming more common. This can result in the deterioration of Open Space Assets and our
ability to maintain them to the highest standard.
There are inspection regimes in place to ensure that assets are fit for purpose. These
inspection regimes are further used to allocate resources and inform future investment
programmes. The inspection regimes include the following key activities:-
Cleanliness and Maintenance Standards
The success of the cleanliness and maintenance regime is measured through the following
mechanisms:-
Local Environmental Audit and Management System (LEAMS)
Currently, three inspections per annum of a 5% cross-section sample of streets within the
area are assessed against the standards set down in the Code of Practice on Litter and

Page 84

6 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Refuse (Scotland) 2018 issued to fulfil the duties under the Environmental Protection Act
1990.
Play Areas
In line with guidance set by the Royal Society for the Prevention of Accidents (ROSPA), the
condition of play areas and equipment within the area are assessed on a weekly basis. This
regime is supplemented by a detailed annual assessment undertaken to inform the
programme to replace equipment and any other works that may be required to the play
areas.
Street Furniture
Assets are informally assessed by Streetscene Officers and Operatives as part of the
cleansing maintenance scheduled and replaced on an ‘as required’ basis. The location and
type of each asset has been mapped on the Council’s Geographical Information System
(GIS). This information will be utilised to inform a formal inspection and replacement
programme.
Trees and Woodlands
Assets are currently inspected on a reactive basis following reports of potential hazards.
Following inspection any appropriate arboriculture works identified are undertaken. An
inspection regime of trees along North Ayrshire’s A-class road verges began in Autumn
2018. The inspection of Roadside trees is an obligation for the Roads Service under the
Roads Scotland Act 1984 and is supported by the Council’s Tree and Woodland
Management Policy, which is incorporated as part of the Roads Asset Management Plan.
Water Features
Safety equipment and measures to restrict access are provided in line with ROSPA
guidance and inspected on a weekly basis. Any works required at this time are undertaken
as a matter of urgency. Formal inspection of water courses is undertaken in consultation with
the Scottish Environment Protection Agency (SEPA).
Allotments
Allotments and community gardens form part of the open space provision. North Ayrshire
Council does not directly manage any of the allotment sites, however, we actively support
the four allotment organisations who lease and occupy Council land. 
As part of the Council’s Open Space Strategy and Allotments Policy, we monitor demand for
allotments and actively seek to identify new sites for food growing where required. We also
encourage and support communities to take part in food growing. 
Infrastructure
Updated surveys have been carried out on cemetery infrastructure and an action plan is
being implemented with the recommendations from these surveys, the Cemetery Capital
Plan.
Memorial Testing
In line with guidance issued by the Health and Safety Executive (HSE) the Council
commenced a rolling five-year programme to inspect and take appropriate action to ensure
the stability of the 70,000 memorials currently present within its cemeteries. This is an

Page 85

7 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
ongoing programme. 
War Memorials
The Council has a duty under the War Memorial (Local Authorities Powers) Act 1923 to
ensure the maintenance repair and protection of War Memorials within its control.
Streetscene Management/Maintenance Programmes
In managing and maintaining the Council’s Open Space and associated assets, the
Council’s Streetscene Service operates to agreed service standards. These standards are
published on the Council’s external website. 
6. Sufficiency (i.e. asset demand) 
North Ayrshire Council has a procedure in place for recording and dealing with complaints.
Details of general enquiries are recorded in the Lagan (Verint) System. This information
highlights numbers of specific types of fault or faults occurring in a geographical area.
A number of reporting forms have also been developed to enable customers to report
problems, issues or faults for the following: overflowing street bin or dog bin, street litter,
waste safety equipment or signage, litter, flytipping, flyposting, graffiti, abandoned vehicles.
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and
Estate Based Inspections. Representation is made by Streetscene (Operations and
Strategy) at Estate Inspections arranged by Housing services.
Responses are also sought via the North Ayrshire Community Planning Partnership People’s
Panel that is comprised of 2000 representatives of the population of North Ayrshire. The
People’s Panel is carried out every 2 years.
A Participatory Budgeting consultation approach enables communities to identify local
priorities and needs and to shape some grounds maintenance activities to meet these
aspirations. 
During 2021, a playpark consultation was carried out as part of the playpark improvement
funding programme across North Ayrshire. Over 500 responses were received, and this
feedback helped to ensure that the playpark improvement funding was utilised to meet the
needs of the local communities. Streetscene has identified a replacement programme for the
allocated playpark monies and carried out member consultation across all 10 ward areas
with elected members. 
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine. This assists in identifying and addressing local issues, sets out
priorities for each locality and how they will be addressed within a developed Locality Plan.

Page 86

8 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
On the North Ayrshire islands, we also work closely with Arran Community Council, Visit
Arran, Cumbrae Community Council, Garrison House Cumbrae and other key stakeholders
to consult on works programmed to be undertaken on the Island of Arran and Cumbrae so
that any concerns are addressed. 
7. Financial
The Council incurs an annual revenue expenditure of £5.62million for 2024/25 in the
maintenance of approximately 2,410 hectares of open space, consisting of:
• 1 Country Park
• 14 Local Parks
• 115 Equipped Play Areas & Multi Use Games Areas (MUGAs)
• 94 Sports Facilities and Playing Fields
• 45 Cemeteries and Burial Grounds
• 23 War Memorials
• 14 Monuments
• 275 hectares of Woodland
• 4 Allotments
• 38 Water Courses and Open Water features
• 16 Beaches - 3 are Sites of Special Scientific Interest (SSSI)
• 5 Promenades
• Residential Greenspace
• Street Cleaning 
There is a range of amenities within the Council’s Open Space, with an estimated
replacement value in excess of £3.5million, these are noted below:
• Play Equipment
• Sports Facilities, such as goal posts, nets etc.
• Benches/Picnic Tables
• Planters
• Railings & Bollards
• Litter and Dog Waste Bins
• Memorials 
The nature of Open Space is such that a financial value cannot be accurately calculated for
all assets. However, the provision of high-quality Open Space can enhance the value of
adjacent land and areas.
Valuations can be undertaken on an individual basis should planning policies permit a
change in designation or where an enquiry in respect of potential purchase is received.
Capital - This is planned on a 10-year basis. Capital funds are profiled dependent upon
when the works are required.

Page 87

9 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
8. Legislation 
Legislation changes can lead to increased demand on Local Authorities’ resources in
managing their assets.
• Environmental Protection Act 1990
• Burials and Cremation Act (Scotland) 2016
• Community Empowerment (Scotland) Act 2015
• War Memorial (Local Authorities Powers) Act 1923
• Wildlife and Countryside Act 1981
• Health & Safety at Work Act 1974
• Occupiers’ Liability (Scotland) Act 1960
• Nature Conservation (Scotland) Act 2004 
9. Policy / Guidance
The Council has a range of plans, policies and strategies in place to inform and co-ordinate
the provision, management and maintenance of its Open Space. These set out the approach
of the Council in response to national policy and legislation as well as the delivery of
objectives expressed locally by the community. These documents include:-
• Open Space Strategy
• Litter, Flytipping & Dog Fouling Prevention Strategy
• Tree & Woodland Management Policy
• Volunteering Strategy
• ‘Adopt a Spot’ Strategy
• North Ayrshire’s 2030 Woodland: A Tree Planting Strategy
• Water Safety Policy
• North Ayrshire Food Growing Strategy
• Children’s Play Strategy “The State of Play in North Ayrshire”
• Local Planning Policies
• Scottish Biodiversity Strategy to 2045
• Scottish Biodiversity delivery plan 2024 to 2030
• Sustainable North Ayrshire Strategy 2024 to 2027
• The North Ayrshire Nature Network (NANN) Strategy

Page 88

10 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
10. Health and Safety 
The Health and Safety at Work etc. Act 1974 (also referred to as HSWA, the HSW Act, the
1974 Act or HASAWA) is the primary piece of legislation covering occupational health and
safety in Great Britain. The Health and Safety Executive, with local authorities (and other
enforcing authorities) is responsible for enforcing the Act and a number of other Acts and
Statutory Instruments relevant to the working environment. In order to comply with these
Health and Safety responsibilities the authority has in place several inspection processes
that are undertaken. These include:
• Water Safety Equipment
• Play Facilities and Equipment
• Asset Condition checks
• Tree Surveys 
These processes dovetail with the relevant policies to ensure residents and visitors can enjoy
our open spaces in a safe manner.“

Page 89

11 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
11. Risk Management 
This section summarises how the Council’s risk management strategy is applied to the
management of the open space asset. It identifies where risks associated with the open
space asset are recorded, identifies the major risks associated with the asset and outlines
how they are currently being controlled.
Risks are currently identified through formal and informal inspection and customer reporting. 
Risk Categorisation - The level of risk associated with Open Space are identified through
inspection and customer reporting. The assets are then categorised and priority repairs are
carried out accordingly.
Risk Control - Risks within the Open Space are controlled by carrying out inspections and
maintenance in accordance with Codes of Practice, adherence to the council’s policy and
compliance with the Open Space Strategy.
Monitoring and Reporting - Risk is continually monitored by the Streetscene management
team. The Executive Leadership Team receive quarterly risk update performance reports
through Pentana.
Risk Register - Top level risks for the Place Directorate are contained within the Directorate
Plan. 
12. Governance of the assets
Any missing or uncaptured assets will be highlighted in the Streetscene Data Management
Plan. This records methods for collection, validating and updating of asset data and an
action plan for improvements regarding estimated or missing data will be produced.
All major projects are reported at the Place Directorate Project Board, Capital Project
Advisory Group (CPAG) and as appropriate Executive Leadership Team (ELT) Major
Projects. 
13. Service Delivery Aspirations / Challenges 
Investment is planned to coincide with asset conditions and future needs. For example,
predicting investment in cemeteries is based on asset condition survey information and the
capacity of current cemeteries, necessitating an extension. This data is invaluable in profiling
the capital budget to ensure it is targeted at the right asset, at the right time.
However, predicting the investment required in open space is more difficult as there are
outside factors out with Streetscene’s control, as environmental factors can contribute to the
demands placed on Open Space asset management. Factors such as climate change may
affect the longevity of assets or result in emergency works. Changeable weather conditions
with severe weather extremes are becoming more common. This can result in the
deterioration of Open Space Assets and may affect our ability to maintain them to the
highest standard.
This is mitigated by having a robust inspection regime in place and will help plan our future
needs and reduce risk. Regular ongoing maintenance of assets, such as play equipment,
also increases the longevity of assets and the planned replacement programme.

Page 90

12 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Investment - Asset Types
Based on historical information, condition surveys, inspection reports and new funding
streams, planned investment is as follows:
Cemeteries: Investment in extending cemeteries (in accordance with the Council’s approach
to cemeteries and localities), wall repairs, improvements to pathways. An estimated £1.5M is
being invested to develop new cemetery provision in Kilbirnie.  
Play Equipment: Weekly inspections and regular maintenance will inform when play
equipment reaches end of life and needs assessed. 
Furthermore, in 2021/22, a total of £500,000 was invested by North Ayrshire Council and in
2022/23 two grants for £118,000 and £117,000 were received from the Scottish Government
for the improvement and development of existing play facilities across North Ayrshire. Rather
than replacing like for like equipment, consideration will be given to items that are more
suitable for use by multiple service users.
Further investment from Scottish Government has been allocated for 2023-2026 to support
the renewal of play parks across North Ayrshire Council.
The capital allocation received from the Scottish Government is as follows:
Capital allocation for 2023/24: £231,000
Capital allocation for 2024/25: £347,000
Capital allocation for 2025/26: £578,000
Street Furniture: Formal and informal inspections will help determine future needs.
Furthermore, in 2021/22 an investment fund of £250,000 was allocated to renew and
improve street furniture assets such as bins, benches and picnic tables. Consideration 
was given to accessibility for those with restricted mobility and wheelchair users.
Open Space: Inspections and audits will inform the investment required.
Woodlands: Inspections will inform the investment required. The Council’s Tree &
Woodland Management Policy sets out the circumstances during which trees could be
removed or pruned.
North Ayrshire’s 2030 Woodland: An initial investment of £500,000 was provided to plant
approximately 108,000 new trees by 2030 to help positively contribute to Climate Change,
which was reduced in 2025/26 by £100,000, due to a reduction in the estimate of funding
required to meet the 2030 target. The Tree Planting Strategy also informs us about the sites
to be selected for new planting areas and woodlands creation. This will include fruit trees to
create orchards, in suitable locations, for community benefit. 
The Open Space maintenance schedule helps ensure structures are kept in a serviceable
condition.
The methodology used to allocate Revenue and Capital funding is outlined below.
Revenue
Works carried out under the revenue budget are generally reactive and routine works
identified through the inspection regime and/or reported defects from the public.

Page 91

13 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Works identified, where there is insufficient budget to immediately carry out repairs and
where they are not prioritised due to safety reasons, are recorded to be completed as and
when funding is available in line with overall priorities.
Funds are allocated to routine preventative and corrective works identified through
inspections. Any reduction in the funding of routine maintenance will accelerate the rate of
deterioration of the asset. 
14. How assets will be used in the future 
Open Space is acquired by the Council in three principal ways:-
• Direct purchase to support a specific Council objective, e.g. regeneration of an area,
or service delivery need e.g. to construct a new cemetery. 
• Development of vacant or derelict land within the Council’s ownership to support a
specific Council objective or service delivery need. 
• Through the planning process as part of the conditions of development e.g. a play
park within a new residential development. 
The general availability of vacant and derelict land within the area has enabled the Council
to retain high levels of open space and avoid disposal unless a particular area can contribute
to the realisation of a wider corporate objective.
Any requests to purchase or transfer land or where the Council wishes to dispose of land to
support a corporate objective will be considered in line with the Council’s Policy for Property
Acquisition and Disposal. In order to support the empowerment of local communities the
Council also has a policy to support the appropriate transfer of assets to community bodies.
This is in accordance with the Community Empowerment (Scotland) Act 2015. Streetscene
is represented on the Council’s Community Asset Transfer (CAT) Officers group.
Equipment and facilities within the Open Space are subject to an inspection programme and
will be assessed for future use purposes or replaced when they reach the end of their safe
working life. These assets are then disposed of in accordance with the Council’s Standing
Orders Relating to Contracts and Contract Procedure Rules.
The acquisition of assets is undertaken in line with the Council’s Planning Policies and Policy
for Property Acquisition and Disposal.

Page 92

14 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Open Space Asset Management Plan sits within a strategic document framework shown
in the diagram below: 
15. Performance Indicators
Cleanliness standards
The Code of Practice on Litter and Refuse (Scotland) 2018 (COPLAR), issued under the
Environmental Protection Act 1990, defines the maximum response times when a litter
problem is reported within or to a local authority. Once the new COPLAR is operational, the
standard of street cleanliness, assessed in terms of ‘litter’ will be measured using 6 categories
graded as A, B, C, D, E & F. 
Grades
A - No litter or refuse is present on any type of land
B - Small amounts of litter and refuse
C - Moderate amounts of litter and refuse, with small accumulations
D – Significant amounts of litter and refuse, with consistent distribution and accumulations
E – Substantial amounts of litter and refuse with significant accumulations
F – Incidents of Flytipping and hazardous/special waste (drug related waste, broken glass,
animal carcasses, car parts, chemicals and spillages) 
Response times – Duty 1
(keep land clear of litter and refuse)
The COPLAR (2018) Duty 1 response times are structured as four bands that recognise
duty bodies’ (the Council) investment in prevention.

Page 93

15 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
It reflects that effective measures increase the likelihood of zones being cleaner for longer,
which reduces the need for rapid restoration.
Streetscene endeavour to maintain all sites to an acceptable’ standard (Grades A and B),
and to address un-acceptable Grades (Grades C-F) within the response times as set out in
the COPLAR (2018).
In summary, these maximum response times will only ensure minimum
standards as defined by the Code of Practice on Litter and Refuse (Scotland) 2018. 
The operational hours of working during the year are as follows:
• Shift teams: 06.30 to 17.30 
LEAMS / COPLAR Update:
Since the new COPLAR was introduced in 2018, the intention was for Zero Waste Scotland
to introduce a new monitoring methodology (to replace the current LEAMS model) which
would be suited to carrying out audits which encompassed all land under the responsibility of
the local authority and not limited to roads and footways. However there has been a delay in
finalising a suitable system. Therefore at present, while the methodology has been changed
to enable the use of the new LMS (Litter Monitoring Survey) app, surveys are still restricted
to streets (as opposed to all land). An overall Cleanliness Score is still published as per the
LEAMS model, based on the percentage of streets achieving an ‘Acceptable’ Grade of A or
B. 
16. ACTION PLAN 
Reference
Number
Action Desired Outcome Lead Timescale
OSAMP_A01 Maintain a list of all
Streetscene Open Space
assets to provide a
comprehensive asset
inventory and record
asset changes in ArcGIS.
Access to an up-to-date list
of assets to ensure all open
space assets are recorded
and monitored effectively.
Streetscene
Strategy / Assets
Ongoing
OSAMP_A02 Review existing Asset
Management Planning
and Inspection process to
inform future replacement
and investment
opportunities for open
space assets.
Develop an efficient
inspection and recording
process (with the option of
considering new technology)
to meet Streetscene’s
strategic and operational
asset management
responsibilities for open
space assets.
Streetscene
Strategy /
Streetscene
Operations /
Assets
Ongoing

Page 94

16 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
OSAMP_A03 Implement the actions from
the Streetscene
Volunteering Strategy and
encourage the Adopt a
Spot initiative.
Framework in place to
support and extend the
existing network of
community volunteers.
Streetscene
Strategy
Ongoing
OSAMP_A04 Assess the risks of
climate change on open
space assets.
Incorporate actions into the
annual operational service
plan to mitigate any
anticipated risks from the
impact of climate change
and changing weather
conditions.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A05 Continually monitor and
assess the suitability of
the capital and revenue
budgets in accordance
with Asset Management
approach.
Effective and efficient use
of budgets.
Streetscene
Strategy /
Streetscene
Operations
Annual
OSAMP_A06 Work with external funding
organisations to obtain
funding for projects that
will result in improvements
to the condition and quality
of open space assets.
Partnership working to fund
bespoke projects.
Streetscene
Strategy /
Streetscene
Operations /
External
organisations
Ongoing

Page 95

1 
ASSET MANAGEMENT PLAN 
PROPERTY

Page 96

2 
1. Introduction 
The Property Asset Management Plan (PAMP) provides the strategic framework for decision-
making at the Corporate Landlord level across the Council. Property Management &
Investment (PMI), a service within the Place Directorate, is responsible for managing the
Council’s portfolio of housing and non-housing property assets. 
The PAMP encompasses all of the Council’s building-related interests and serves two primary
purposes: - 
• To articulate the Council’s objectives, priorities, programmes, and performance in
relation to its property assets.
• To offer a clear strategic direction for internal stakeholders and external customers
involved in property-related matters. 
As a key policy and performance document, the PAMP plays a vital role in supporting the
delivery of the Council Plan. It is a technical document focused on the operational “how” of
property service delivery, outlining the strategic approach to managing property resources
that underpin frontline services. Complementing the PAMP is the Estates Strategy, which
presents a high-level overview of the Council’s property vision, objectives, and the associated
programmes and projects driving the implementation of this strategy. 
Our Role 
At North Ayrshire Council, the Property Management and Investment (PMI)
service centrally manages the Council’s property assets and associated
budgets, operating under the Corporate Landlord model. This centralised
approach ensures that resources are effectively prioritised and directed to
where they are most needed, aligning the property portfolio with the Council’s
strategic objectives. 
We collaborate closely with Council services, partners, and elected members
to develop innovative solutions that adapt our non-housing property assets to
meet evolving service needs. Our core responsibility is to manage the
Council’s property portfolio efficiently, delivering best value to both our internal
services and the wider North Ayrshire community.
This includes, but is not limited to: - 
• Ensuring the estate is used as efficiently and effectively as possible.
• Overseeing the day-to-day management of assets, including ongoing
maintenance and repairs.
• Delivering well-designed new buildings that fully meet service
requirements.
• Identifying and disposing of surplus assets through collaborative locality
planning with service Directorates.
• Managing the successful delivery of capital projects.
• Administering leases and licences effectively to support operational and
community outcomes.

Page 97

3 
This Property Asset Management Plan sets out the North Ayrshire plan for the management
of the Council’s property assets for the period 2023 – 2028, incorporating a data refresh in
2025 to reflect progress to date. 
2. Aims & Objectives 
North Ayrshire Council has set out its strategic direction through the Council Plan 2023–2028,
which identifies four principal objectives essential to fulfilling the Council’s vision and mission.
Effective and efficient property asset management is critical to the successful delivery of these
priorities, which are: - 
• Wellbeing
• Communities & Local Democracy
• Climate Change
• A Sustainable Council 
The purpose of this Property Asset Management Plan (PAMP) is to support the
implementation of the Council Plan by ensuring that property assets remain proactive
enablers of high-quality service delivery. 
Property assets are fundamental to the delivery of North Ayrshire Council’s services. Their
effective management is a structured and strategic process designed to ensure best value,
drive continuous performance improvement, support corporate priorities, and enable the
modernisation of services. 
Purpose
The PAMP contributes to the achievement of North Ayrshire’s strategic priorities
by: -
• Establishing a corporate framework for the management of all Council
property assets.
• Providing a comprehensive overview of the Council’s extensive property
portfolio.
• Identifying internal and external drivers, risks, and challenges that
influence property-related decisions.
• Defining a series of key activity themes aimed at enhancing the
performance and value of property asset management.
• Linking to financial planning, setting out clear investment priorities for the
Council’s property estate to support long-term service delivery.

Page 98

4 
3. General Description of Assets 
The following table summarises the Council’s operational properties within North Ayrshire: - 
Property Type Uniclass Category Quantity
Historic Buildings B582 14
NAC Offices (inc. leased-in) D3141, D3142, D3154, D325 17
Schools (inc. Early Years stand-alone assets
and ASN schools) D711, D712, D713, D717 60
Community Properties including Libraries D3143, D51, D532, D5322, D5323,
D5341, D754, D762 48
Depots, HWRC and Storage Units D1264, D173, D1732, D2722,
D2823, D284 22
Commercial (inc. individual units) D283, D345 223
Sheltered Housing/ Day Care Centres D441, D447, D8141, D8144 35
North Ayrshire Leisure Limited D541, D562, D563, D567, D56771 15
Cemeteries (inc. graveyards/ churchyards) D673 34
Residential non-HRA D442, D4461, D855 14
Educational Resource Centres D5841, D586, D74 5
Other Sports, Pavilions & Travellers Site D5685, D5845 5
Public Conveniences (exc. APC’s) D941, D942 24
Total Number of Operational Property Assets 516
of which, Common Good Assets 7 
Table 1 - Property Asset Designations as of July 2025 
3.1 Sustainability Assets 
In addition to the property assets listed above, the Council are commencing the operation of two solar
farms, receiving an income for the renewable electricity generated.    
These assets are owned by the Council and the energy generated will be sold through a Power Purchase
agreement (PPA). 
The sites will be managed by the Council’s Sustainability Team, with contracts in-place for the on-going
maintenance of the assets.     
It is anticipated that Sustainability Assets will be increasingly important to the Council as we move 
toward net-zero.

Page 99

5 
4. Asset Management Performance and Drivers for Change 
To realise the objectives set out in this PAMP, ambition must be matched by the consistent,
year-on-year delivery of significant, measurable, and meaningful benefits for both the Council
and the residents of North Ayrshire. The Council must be able to clearly demonstrate these
outcomes through robust performance measures, satisfying internal expectations as well as
external scrutiny and benchmarking requirements.
Case Study 
Solar Farm Projects 
Background
North Ayrshire Council has embarked on an ambitious renewable energy initiative to
reduce carbon emissions and generate sustainable income. This project represents the
first solar PV farms owned and operated by a Scottish local authority, marking a
significant milestone in Scotland’s local government-led decarbonisation efforts. 
The project demonstrates innovative use of former landfill sites which are not suitable for
any other purpose. 
The feasibility of “private-wire” supply opportunities with other public sector parties is also
being investigated at present. 
Objectives
• Decarbonisation: Support the Sustainable North Ayrshire Strategy and Scotland’s
net-zero targets.
• Land Reuse: Transform former landfill sites into productive renewable energy
assets.
• Financial Sustainability: Generate income through a Power Purchase Agreement 
• Community Benefits: Allocate part of the income to tackle fuel poverty and fund
local renewable projects.
• Carbon sequestration and bio-diversity: utilise available land for tree-planting and
to support wildlife. 
Outcomes
• Environmental: Significant reduction in carbon emissions and contribution to
Scotland’s renewable energy mix.
• Economic: Long-term revenue stream for the Council, helping sustain local
services.
• Social: Community reinvestment, job creation, and educational opportunities
around sustainability.
• 4000 trees planted in areas not suitable for panel installation and a variety of
nature positive interventions supporting the North Ayrshire Nature Network. 
Solar Farm Site Area  Panels Capacity 
Nethermains 23 acres 12,000 + 7.48 MW
Shewalton  16 acres 8,500 +  5.05 MW

Page 100

6 
The asset management performance challenge is illustrated in the following chart, which
captures both external assessments, aligned with statutory performance obligations, and
internal challenges through a structured performance measurement framework. In essence,
the approach is to evaluate how effectively the Council is performing against clearly defined
criteria that reflect its priorities of efficiency, effectiveness, and added value. 
PMI will ensure that the framework and disciplines underpinning Corporate Asset
Management Planning are maintained and reviewed on an annual basis to support continuous
improvement. 
Property Performance Challenge 
Corporate
Objectives 
Optimised
Portfolio 
Performance aligned with property type and use, e.g.;   
Presenting relevant information clearly and concisely is essential to understanding how well
property assets support service delivery. A straightforward, informative approach enables
meaningful insights into property performance and informs strategic decision-making.
To guide this process, the following key questions must be considered: - 
• What property does the Council own?
• How well is it performing?
• What are the long-term requirements?
• How can these needs be met and funded? 
In recent years, work has been undertaken to assess the condition and suitability of each
operational property. These assessments have provided a comprehensive understanding of
asset performance, enabling evidence-based decisions on future investment priorities.
Operational  Office  Tenanted Investment Surplus Community
Platform  Theme Indicators 
Asset Data
Records 
Business
Partners 
Condition National 
Use of National
property
Management
Performance
Indicators
(NaPPMi) 
Local
Developed by NAC
to meet own
Cost
Income
Value
Sufficiency
Suitability
User
Utilisation
Sustainability
Accessibility
specific needs 
PAMP
Performance  Comparisons 
Efficiency    Other
Effectiveness Industry
Value Public Sector
Specific actions,
reported through
corporate
performance
framework 
Data Measures Outcomes
Stakeholders
Requirement

Page 101

7 
The most recent condition surveys focused on key operational properties, evaluating the
physical condition of building elements against their expected design life. This has allowed
the identification of priority investment needs, supporting a needs-based approach to capital
planning and helping ensure resources are directed where they will deliver the greatest value. 
5. Managing the Estate  
The Council is committed to transparent, inclusive, and collaborative management of its
property assets. In line with Part 5 of the Community Empowerment (Scotland) Act 2015,
we will:
• Cross-Service Engagement: Maintain a corporate approach to asset decisions,
ensuring alignment with service delivery priorities, sustainability objectives, and
opportunities for co-location and shared use.
• Community and Partner Engagement: Engage communities early and
meaningfully in decisions affecting local assets. We will provide clear, accessible
information on available properties, decision-making processes, and opportunities for
involvement.
• Stakeholder Interaction: Work proactively with elected members, community
bodies, public partners, and third-sector organisations to ensure property strategies
reflect shared priorities and deliver best value.
• Community Asset Transfer (CAT): Support community bodies to request
ownership, lease, or other rights over council assets. We will:
o Publish and maintain a Register of Land.
o Assess CAT requests based on community benefit, viability, and
sustainability.
o Presume in favour of transfer unless reasonable grounds for refusal exist.
o Offer guidance and pre-application support to improve outcomes.
Key Drivers for Change
Several emerging constraints are expected to influence the success of the Property
Asset Management Plan. These drivers include: -
• Net Zero Commitment: The Council’s pledge to achieve net zero carbon
emissions by 2030 necessitates significant investment in existing building stock.
This includes upgrading or replacing mechanical and electrical systems with more
energy-efficient and renewable technologies, alongside improving building fabric
and enhancing thermal performance.
• Specialist Expertise for New Projects: To meet stringent environmental
standards such as Passivhaus, future capital projects may increasingly depend
on external consultants with specialist knowledge in sustainable design and
construction.
• Economic Challenges: The current economic climate presents ongoing financial
pressures that affect the Council’s operations. In particular, budget constraints
impact the maintenance and upkeep of property assets that support the delivery
of core services.
• Evolving Work Practices: The shift towards agile and hybrid working post-
pandemic has reduced demand for traditional office accommodation. As a result,
many properties are now underutilised, prompting a reassessment of space
requirements across the estate.

Page 102

8 
• Monitoring: Report regularly on CAT activity and engagement effectiveness,
ensuring continuous improvement and compliance with statutory requirements. 
6. Condition and Suitability 
A Condition Survey provides a detailed, elemental assessment of a property’s physical state.
It evaluates: - 
• The current condition of the building.
• Estimated costs to bring the asset up to standard.
• Anticipated future expenditure.
• Key recommendations, concerns, and actions required. 
Condition Surveys are core to investment planning and support informed decision-making by
offering a clear understanding of the performance of building systems. As part of this process,
properties are assessed against a condition grading scale, indicating the proportion of gross
internal floor area that falls into one of the following categories: -
Case Study 
Locality Based Property Review 
In 2023, North Ayrshire Council commissioned a feasibility study to assess the utilisation
of corporate buildings within the Irvine locality. This review was driven by the shift towards
hybrid working and the resulting reduction in demand for traditional office environments,
aligning with the objectives of the Our Future Working Environment (OFWE)
workstream. 
The study identified several rationalisation opportunities that could deliver significant
financial savings and reduce carbon emissions through estate consolidation. A dedicated
working group developed these recommendations into a structured action plan to ensure
that the Council’s property portfolio in Irvine aligns with future accommodation
requirements. Key actions include: - 
• Corporate Workforce Consolidation: Relocating staff from Bridgegate House to
Cunninghame House to create a single headquarters.
• Service Relocation: Optimising space and releasing surplus buildings for disposal
(e.g., Genealogy services moving from Irvine Townhouse to Irvine Branch Library;
Employability Hub relocating from Trinity Church to Lochshore Visitor Hub).
• Commercial Property Realignment: Maximising building use and income
generation (e.g., Business Support & Development moving from Quarry Road to
Cunninghame House; North Ayrshire Leisure Ltd relocating to Irvine Townhouse;
separating Quarry Road office block from the Circuit sports complex). 
Implementation is well underway and scheduled for completion by Spring 2026. 
Building on this success, a second phase of locality-based asset review is currently in
progress, focusing on the remaining five localities. The Council anticipates achieving
similar benefits through further rationalisation and optimisation of its property assets.

Page 103

9 
A.  Performing well and operating effectively (typically reserved for new-build or
extensively refurbished property assets).
B.  Performing adequately but exhibiting minor deterioration.
C.  Showing major defects and/or not operating adequately.
D.  Life-expired and/or at serious risk of imminent failure. 
To maintain an accurate and up-to-date picture of the estate, a dedicated PMI officer is
responsible for carrying out full condition surveys on all operational properties every five
years. 
Suitability assessments have been undertaken for a number of the Council’s operational
properties. The Statutory Performance Indicator (SPI) on suitability measures the proportion
of buildings considered appropriate for current use, classified as either: - 
Category A – Suitable for current use with no significant issues.
Category B – Suitable for current use, with minor issues not affecting service delivery. 
This work will continue under the current PAMP to support more comprehensive
benchmarking of asset performance, aligning with the Council’s ongoing property
rationalisation programme. 
Alongside suitability, the effective utilisation of property assets is fundamental to achieving
the Council’s vision and strategic priorities. The drive for greater efficiency underpins the
Council’s ambition to maintain an operational estate that is fit for purpose and aligned with
service delivery needs. Effective asset management relies on identifying how properties are
currently used, forecasting future demand, and planning accordingly. 
A central component of this process is the identification of under-utilised assets. These
properties are subject to detailed review to explore opportunities for improved utilisation,
alternative service delivery models, or potential disposal where appropriate. This ensures
assets are either fully optimised or released to generate value elsewhere. 
To date, comprehensive utilisation data has primarily been gathered for the school estate.
This analysis shows that no schools are currently operating above building capacity, while
33% of primary and secondary schools have pupil rolls below 60% of their capacity - an
increase of 11% since the last report. These findings are vital in shaping both the Capital Plan
and estate rationalisation strategy. Where feasible, schools with surplus capacity are being
considered for development into community hubs, helping to maximise use and deliver
broader community benefits. 
In order to assess the overall sufficiency of the estate and determine where future investment
Building suitability is defined as: - 
“The extent to which a property meets the current and future needs of, and
contributes toward the improvement of, service delivery.”

Page 104

10 
should be directed, further analysis is required. This includes evaluating housing development
plans and demographic forecasts to ensure the estate evolves in line with population growth
and shifting service demands. 
7. Sustainability 
Sustainability principles have become integral in all aspects of property asset management,
and help to ensure the Council’s estate supports environmental, social, and economic
objectives, aligning with NAC’s Net Zero targets, the Scottish Government’s Heat in Buildings
Strategy and deliver long-term value. 
The strategic objectives of sustainability in property asset management include: - 
• Carbon Reduction: Minimise carbon emissions from the property portfolio through
energy efficiency, renewable energy integration, and sustainable design.
• Resource Efficiency: Reduce waste and water consumption, and promote circular
economy principles in construction, maintenance, and disposal.
• Resilient Assets: Ensure buildings are climate-resilient and adaptable to future service
needs.
• Community Benefit: Support local economic development and wellbeing through
sustainable practices and community involvement.
Property Management & Investment collaborates closely with the Energy & Sustainability
team, sharing a common commitment to developing a more efficient and environmentally
sustainable property estate. Between the two services, the following key actions are being
applied: - 
• Energy Management: Implement energy audits and invest in low-carbon technologies
(e.g., heat pumps, solar PV, advanced BMS).
• Sustainable Construction: Apply Scottish Government’s sustainable building
standards for new builds and major refurbishments.
• Lifecycle Planning: Incorporate whole-life costing and carbon impact assessments into
asset decisions.
• Green Infrastructure: Enhance biodiversity and green spaces within the estate.
• Monitoring: Use performance indicators such as EPC ratings, carbon footprint, and
water usage to track progress. 
• Regular reporting to ELT regarding Energy consumption, carbon emissions, and on-
going initiatives to reduce energy use. 
In-use energy information is collated and used to plan decarbonisation investments. For
example, through work to replace traditional lighting with LED within the property estate. North
Ayrshire Council has reduced its Carbons Dioxide emissions by 57.54 tonnes. As well as
reducing its Carbon Dioxide emissions, these works have also helped to save North Ayrshire
Council £69,399 in running costs per year. Wider planning for the wider decarbonisation of
the estate is underway.

Page 105

11 
8. Risk Based Investment Prioritisation 
Property Management and Investment (PMI) undertake condition surveys across the
corporate estate and this information is used to inform property lifecycle investment decisions.
Alongside this data, there is a structured process in place to understand client’s priorities and
where property issues are, or have the potential to, impact on service delivery.     
As the lifecycle replacement requirements greatly outweigh the available budgets,
components are rarely able to be replaced in accordance with their intended lifespans.
“Sweating” these assets in his way lead to an increased burden on already stretched reactive
maintenance budgets and greater potential for failure / loss of service and health and safety
implications to arise.     
Increasing statutory and legislative requirements are also placing an increasing burden on
existing budgets. For example, recent changes to Electrical Installation, Fire Safety and Water
Quality regulations are generating the need for further investment.     
There is also the need to reduce carbon emissions within the property portfolio, alongside the
challenge of meeting energy costs. Targeted investment in energy efficiency measures is
helping to address this; however, the scale and pace of this investment must increase if we
are to meet our net zero targets.     
The Property Lifecyle Fund is promised by PMI, based on the various factors as outlined in
the diagram below which highlight the risk-based approach to planning this investment.     
9. Sufficiency 
The shift toward hybrid working, accelerated by pandemic-related restrictions and supported
by advancements in technology, has significantly transformed the working environment. As
more staff operate remotely, the demand for traditional office accommodation has markedly
decreased. This reduction in occupancy across many Council buildings presents a strategic
opportunity to rationalise the estate through the consolidation of services. 
There has therefore been a program of locality-based reviews, supported by the
Transformation Team, to map service need across the property estate. The main outcome of
this work has been the planned closure of Bridgegate House and the intensification of use
within Cunninghame House. This process continues, alongside a wider program of property

Page 106

12 
changes within the Irvine area.   
A wider review has also been concluded; the range and scope of projects flowing from this
work does not have the same potential impact due to the nature of the estate.  None the less,
potential actions are emerging and will be reported to the Transformation Board in the first
instance. 
Effective estate management requires continuous monitoring and review of the asset portfolio.
Properties identified as surplus to requirements may be considered for disposal, either
through sale or community transfer. The disposal of surplus assets offers several benefits,
including: - 
• Revenue savings through the elimination of ongoing running costs.
• Capital receipts generated from asset sales.
• Reduction in statutory obligations, alleviating pressure on internal resources.
• Risk mitigation, particularly in older buildings with latent defects such as asbestos,
Legionella, or ageing mechanical plant.
• Community empowerment via Community Asset Transfers, enabling local
organisations to take ownership and make use of the properties.
• Progress toward net-zero carbon targets, by divesting from inefficient or high-emission
buildings. 
This strategic approach to managing sufficiency ensures that the Council’s property portfolio
remains aligned with current service needs, offers value for money, and supports long-term
sustainability objectives. 
10. Financial 
The total revenue running costs for the Council’s operational estate in 2024/25
amounted to £17.614m. This figure includes all expenditure related to reactive repairs,
planned preventative maintenance, statutory compliance, utilities, non-domestic rates,
insurance premiums, and other associated property-related costs.

Page 107

13 
In addition to committed revenue investment, the Council continues to support its property
estate through ongoing capital funding via the Property Lifecycle Investment (PLI) budget.
This funding stream is essential for the effective maintenance and management of assets,
with the aim of maximising the operational life of each building. Investment is strategically
targeted towards properties requiring fabric upgrades and plant replacement, based on
priorities identified through cyclical condition surveys. 
Since 2016/17, a total of £16.010 million has been invested in operational buildings
through the PLI budget. An additional £6.550 million in capital investment is projected by
2030/31, further supporting the sustainability and functionality of the Council’s estate. 
As outlined in Section 6 – Sufficiency, the disposal of surplus property assets presents an
opportunity for the Council to generate capital receipt income through asset sales. A summary
of the current Capital Receipts Schedule is provided below: -
£7,885,742
£3,003,984
£6,723,809
Property Running Costs 24/25
Utilities
Property Maintenance
Property Costs (Rates, Insurance, etc.)
£0
£500,000
£1,000,000
£1,500,000
£2,000,000
£2,500,000
£3,000,000
£3,500,000
Property Lifecycle Investment Capital Commitment
Budget Actual

Page 108

14 
Funding Actual
2024/25
Estimated
2025/26
Estimated
2026/27
Estimated
2027/28
Estimated
2028 &
beyond
Total
Estimated
General
Fund
£376,110 £3,088,650 £1,065,000 £30,532,500 £895,000 £35,581,150
HRA £12,030 £3,000 £0 £0 £0 £3,000
Common
Good £0 £0 £0 £35,000 £300,000 £335,000
Totals £388,140 £3,091,650 £1,065,000 £30,567,500 £1,195,000 £35,919,150 
11. Legislation and Statutory Compliance 
The upkeep of public buildings demands rigorous coordination of all disciplines required for
statutory compliance. The Contracts, Compliance & Maintenance team centrally manages
recurring inspections and servicing across a broad range of building systems, including: - 
• Gas safety and soundness tests.
• Electrical installations condition reports (EICR) for fixed wiring.
• Fire risk assessment (FRA) renewal.
• Fire appliance servicing and testing.
• Fire detection system testing.
• Emergency lighting testing.
• CCTV maintenance.
• Legionella control (ACoP L8): risk assessments, biological sampling, and temperature
testing.
• Air-conditioning and air-handling unit (TM44) servicing.
• Passenger lift servicing.
• Automatic door servicing.
• Pressure vessel servicing.
• Pool plant servicing. 
The team also oversees any activities in areas where asbestos-containing materials (ACMs)
may be present. Prior to any planned construction or refurbishment, the asbestos register is
reviewed. If ACMs are suspected, a specialist contractor conducts a Refurbishment &
Demolition survey, and samples are analysed at a UKAS-accredited laboratory. All buildings
with registered ACMs undergo regular inspections to confirm that materials remain intact and
are not releasing airborne fibres. These actions are carried out in strict accordance with the
Control of Asbestos Regulations 2012.

Page 109

15 
12. Reactive Maintenance 
Health and Safety issues are the priority for reactive maintenance spend.  
We do take a risk-based approach to prioritisation of reactive repairs and the risk of harm to the
building occupants is a key part of that consideration, including the “profile” of the people / tasks
involved (i.e., are people sleeping, are people vulnerable, are hazardous activities being undertaken,
etc.). Key considerations for PMI officers include issues such as: - 
• Immediate risks such as fire, electrocution, falling objects etc.  
• Risk to service delivery 
• Risk to building security 
• Staff hygiene and welfare 
• Budget available     
In an environment of pressure on budgets, both from historic budget reductions and current cost
inflation, the item-by-item drill-down on what can and can’t be done is very challenging. What could be
a priority in one property may not be a priority elsewhere as the activities in the property are
different.  It is acknowledged this can lead to tension as there is greater demand for reactive repairs
than the current budget allows. This is exacerbated as the portfolio and many of the existing services
and systems age.    
Reactive repairs are received from properties by the CC&M team through the electronic reporting
system (RADAR).  
During office hours, CC&M operates an emergency helpdesk to address serious issues as a matter of
urgency.  
Out-with office hours, the Public Protection team 24 call centre receives all emergency contact and
can instruct the appropriate contractors to respond.   
12.1 Prioritisation of defect reporting items 
Maintenance officers undertake an assessment of each reactive maintenance issue raised, utilising
their knowledge and understanding of the issues raised, the property at hand and the specific user’s
needs. The assessment framework follows the following principles: -

Page 110

16 
12.2 Formal Assessment 
As the largest portfolio, regular cyclical reviews are undertaken within the Education Estate to carryout
focused reviews of individual properties and specific topics of risk. This has also been rolled-out to the
Community Estate as part of the prioritisation process for the Community Asset Transfer fund.  
A template for assessing larger issues (either identified through an arising substantial defect, or
escalated through the noted process out with the scope day-to-day operational RADAR reporting)
which arise through has also been created and is being piloted.  
Use of this template will be an exception as completion for each individual RADAR request is not
sustainable within current resources.   
12.3. Client and Interface 
In addition to the electronic reporting system and emergency helpdesk, there are various forums
where PMI officers interact with services regarding property matters, providing an opportunity to
highlight issues being experienced, priorities and joint planning to implement solutions / mitigations.   
Group  Core Attendees   Frequency  
Education Estate Review
Group  
Chaired by PMI senior Manager. 
Education infrastructure team,
CC&M, Assets, and GSR&CP 
Quarterly 
Education Project Board  Attended by PMI senior Manager,
GSCRP Team Manger, Schools
for the Future Team Manager and
relevant project leads.  
Bi-monthly 
Ardrossan Campus Project
Board 
Attended by PMI senior Manager
and Schools for the Future Team
Manger.  
Quarterly 
HSCP / NHS Joint Property
Group 
Attended by PMI Senior
Manager.  
Quarterly 
HSCP Health and Safety
Meeting  
Attended by PMI Senior Manager.  As required 
Place Health and Safety
Meeting  
Attended by PMI Senior Manager.  Quarterly  
Communities Health and Safety
Meeting 
Attended by PMI Senior Manager.  As required  
Community Facilities Estates
Operational Meeting. 
Attended by CC&M Team
Manager.  
Quarterly 
Neighbourhood Servies Liaison
Meeting  
Attended by GSCRP Team
Manager, CC&M Team Manager
and Assets Team Manger.  
Quarterly 
Community Facilities Estates
Review group  
Chaired by PMI Senior Manager.
Attended by GSCRP Team
Manager, CC&M Team Manager
and Assets Team Manger. 
Quarterly 
KA Leisure Operational Liaison   Attended by GSCRP Team
Manager, CC&M Team Manager
and Assets Team Manger. 
Quarterly

Page 111

17 
KA Leisure Strategic Liaison   Attended by PMI Senior Manager.  Quarterly 
PMI / CHaS liaison meeting   Chaired by PMI Senior Manager,
attended by CC&M Team
Manager.  
Quarterly  
Maintenance / Contract Officer
Site Visits 
Maintenance Officers and contract
officers.  
As required 
PMI / FM / Education Liaison
meeting  
Attended by GSCRP Team
Manager, CC&M Team Manager
and Assets Team Manger. 
Quarterly     
In addition to the regular client liaison meetings, there is a process for escalation of issues which are
not resolved through the standard defect reporting process. 
13. Health and Safety 
The Health and Safety at Work etc. Act 1974 serves as the primary legislation governing
occupational health and safety across Great Britain. In addition to this overarching framework,
the service adheres to the guidance set out in the Health and Safety Executive (HSE)
publication HSG159 – Managing Contractors. This guidance provides best practice for the
selection, engagement, and management of contractors, ensuring that all work is carried out
safely and in compliance with legal obligations. 
Construction projects are also progressed in accordance with the Construction (Design
Management Regulations) 2015. 
In addition, much of the work of PMI supports the Council to fulfil its duty of care in respect of
providing a safe physical environment for staff, building users, residents etc. 
14. Risk Management 
The successful delivery of the PAMP is influenced by several key constraints, including
financial limitations, statutory compliance requirements, property condition, backlog
maintenance, and available resources.

Page 112

18 
Finance remains the most significant constraint, as all local authorities continue to navigate
the challenges posed by diminishing budgets and increasing service demands. Identifying
more efficient ways to utilise the existing estate, such as adapting to new working
environments, shifting organisational culture, and co-locating services and teams, must be
carefully balanced against the reality of constrained financial resources. 
Statutory compliance is a critical priority for operational properties and constitutes a
substantial proportion of the annual PMB. Ensuring continued compliance with legal
obligations requires consistent investment and oversight. 
The ability to maintain operational properties effectively is directly linked to the level of
available funding. However, the Council’s cyclical condition surveys provide valuable insight
and support the strategic prioritisation of repairs and maintenance works to ensure the best
use of allocated resources. 
Looking ahead, there is a clear need to transition toward a more robust planned and
preventative maintenance approach across the entire estate. This will reduce reliance on
Risks to the Delivery of the PAMP 
The successful implementation of the PAMP is subject to several high-level risks that
could affect its delivery. These risks must be proactively considered and managed to
ensure effective execution. Key risks include: - 
1. Financial Constraints
External economic factors, such as high inflation, volatile global markets, and material
or labour shortages, can significantly impact construction and maintenance costs.
These pressures may reduce the scope for routine and reactive maintenance, as well
as limit planned capital investment, thereby placing strain on the Council’s ability to
deliver core asset management objectives. 
2. Business Continuity
Robust business continuity arrangements are essential to mitigate the impact of
unplanned disruptions to Council operations arising from property-related issues.
Inadequate contingency planning could result in service interruptions and reputational
risk. 
3. Legislative Change
Evolving legislation may require the development of new facilities or adaptation of
existing ones to support emerging statutory service requirements. This could place
additional strain on the capital plan and existing budgets. Furthermore, changes in
compliance standards may render some retained assets no longer fit for purpose,
requiring unanticipated investment to maintain service delivery. 
4. Net-Zero Carbon Targets
The Council’s commitment to achieving net-zero carbon emissions presents both a
strategic imperative and a financial challenge. Managing our portfolio moving forward
in alignment with the Scottish Government’s Heat in Building Strategy, and meeting
our ambitious targets, will require substantial investment in energy-efficient
technologies, renewable energy solutions, and building upgrades across the estate. 
5. Workforce Capacity and Capability
The availability of suitably skilled and experienced personnel is critical to the
successful delivery of the PAMP. A shortage of appropriately qualified staff could
delay progress and undermine the achievement of key priorities.

Page 113

19 
reactive repairs, enhance long-term asset performance, and improve value for money. 
All of the aforementioned risks must be carefully considered and addressed through robust
governance arrangements as set out within the PAMP. These procedures provide the
framework through which risks can be mitigated, or at a minimum, appropriately controlled to
support the successful delivery of the Plan. 
Risks at the project level are managed through established project management processes,
including the use of standard documentation and regular reporting. Individual project risks
and associated mitigation measures are recorded in dedicated risk registers. Significant risks
are also summarised within Project Summary Sheets, which are routinely reported to the
Executive Leadership Team (ELT) and the Capital Programme Appraisal Group (CPAG) to
ensure appropriate oversight and decision-making. 
15. Governance of the assets 
The Council recognises the importance of managing its property asset base through a
corporate, strategic approach. To support this, a structured framework has been established,
setting out clear roles, responsibilities, accountability, and control. This ensures a consistent
and coordinated method of decision-making across the organisation, aligned with service
priorities and corporate objectives. 
The Council is responsible for managing a number of Common Good and Trust properties
across North Ayrshire. Where such properties are occupied by the Council for service
delivery, an appropriate rental payment is made into the relevant Common Good and/or Trust
Fund. 
These assets are held in trust for the benefit of the local community and encompass a diverse
range of property types, including amenity land, historic buildings, offices, sports pavilions
and pitches, public parks, and other public facilities. Income generated through leasing
arrangements is used to fund the maintenance and repair of these properties, where required.
Responsibility for internal repairs and maintenance lies with the individual tenants. 
The Council's leased-out commercial estate comprises 160 properties, including 94 industrial
units, 41 retail units, and 25 office spaces. Management of the commercial and industrial
property portfolio has been delegated to the Business Support and Development team, who
oversee operations with the support of external property management consultants, Graham
+ Sibbald. 
The following diagram illustrates the core principles of this integrated asset management
approach, based on a model of centralised corporate ownership and governance: -

Page 114

Principal communications of asset management
through integrated corporate ownership
Based on RICS Public Sector Asset Management Guidelines
2011 
NAC Cabinet
Approval of strategic AM decisions 
CPAG
(Capital Programme
Planning Asset
Group)
Developing and
delivering NAC’s
capital investment
programme. 
Active
involvement with
Strategic Asset
Group 
Operational Directorate Asset
Representatives 
Develop
operational plans
with AM function
Corporate
Landlord -
Asset Management
Function
Delivered by PMI.
Supports the
Transformation Board
in coordinating AM
strategically, assists
Directorates in
developing future
accommodation needs. 
Asset
Champion
(Director
of Place)
An asset voice at
management/
executive/member
level. 
Directorate
Project Boards
Transformation
Board
Coordinates asset
management
strategically and
recommends to
Executive Leadership
Team. 
Team Manager
Assets &
Estates
Responsible for
rationalising the
Council’s
operational estate. 
Executive
Leadership
Team
Corporate Decision-
making body. 
Health &
Social Care
Partnership 
Chief
Executive’s  Place  Communities
& Education

Page 115

21 
16. Future Service Delivery Aspirations and Challenges 
In 2022, PMI in collaboration with the Transformation Team, initiated a comprehensive review of
property usage across North Ayrshire as part of the Land and Property Transformation
Workstream. The primary aim of this review is to identify opportunities for estate consolidation
and rationalisation across all Council localities. 
Following the successful progress of the Irvine locality review, work is on-going to undertake an authority
wide locality-based property asset review and identify potential opportunities for rationalisation and
consolidation. By doing this we will demonstrate a more efficient use of our assets across North Ayrshire
in delivering Best Value to our citizens, whilst also positively contributing to the council’s net zero
ambitions. 
The objectives of this programme are to: - 
• Reduce ongoing property running costs.
• Minimise future capital investment requirements.
• Support the Council’s commitment to lowering carbon emissions.
• Align the property estate with service delivery and community needs 
Progress on this initiative is regularly reported to the Corporate Transformation Board,
ensuring alignment with wider organisational priorities and strategic planning. This work is critical
to shaping a modern, efficient, and sustainable estate that supports future service delivery. 
The Council are pioneers in Community Wealth Building (CWB) and launched Scotland’s first
Community Wealth Building Strategy in May 2020. CWB aims to retain wealth and economic
benefits within the local area, making our communities more inclusive, resilient and sustainable.
A key objective of CWB is maximising the use and function of our land and property assets for
the benefit of local people. This includes exploring alternative use of council owned assets for
communities or businesses and supporting Community Asset Transfer to grow community
ownership. 
Potential for Community Asset Transfers is linked to asset and investment planning through the
locality review work and on-going PMI / Connected Communities review of the estate. A
dedicated Community Asset Transfer working group, chaired by Connected Communities and
attended by relevant Council Services and The Ayrshire Community Trust (TACT) is in place.

Page 116

22 
Case Study 
Brisbane Centre Community Asset Transfer 
Following declaring the Brisbane Centre in Largs as surplus, the Council successfully
transferred the ownership of the property to the Clyde Coast and Cumbraes Men’s Shed
(SCIO) though the Community Asset Transfer process. The transfer of the Brisbane
Centre is a key example of North Ayrshire Council's "Community Wealth Building
ambitions" and the application of the Community Empowerment (Scotland) Act 2015. 
History: The Brisbane Centre (originally the Bath Hall, built in 1816) has served many
purposes over its history, including a bath house, library, a roller skating rink, and most
recently, a council-managed community facility and a Covid testing centre.
The Community Group: CC&CMS moved into the centre in October 2022 and has since
been operating it successfully. The group provides a space for men of all ages to meet,
socialise, share skills (like woodwork), and engage in purposeful activities, with the
primary goal of reducing isolation and improving mental and physical wellbeing. Since the
transfer was completed, the group have secured in excess of £75,000 of external funding
to undertake internal adaptations to better meet the operational needs of the group.
The Transfer: In February 2025, the Council agreed to sell the property to the Clyde
Coast and Cumbraes Men's Shed (CC&CMS) for a nominal fee of £3,700 (5% of its
£74,000 valuation). This price reflected the building's condition, the group's prior
investment, and the potential social return on investment. To support the transfer, £44k
was invested from the CAT Start Up Fund to re-roof the property and a further £5,000
was passed to the group to undertake external decoration to the sea front asset. To
assist with long term financial sustainability, NAC are supporting CC&C Men's Shed to
explore the addition of solar panels on the roof. 
Outcome & Impact: The community-led ownership allows the group to secure additional
funding, invest in and enhance the facility to meet their specific needs, and expand their
membership and services, thus deepening their positive impact on the local community.
The group has been highly successful and has received accolades such as the "Scottish
Men's Shed of the Year" award. 
This case study highlights the Council's approach to empower local communities by
allowing groups to take responsibility for local facilities, ensuring public assets are used
frequently and effectively for community benefit.

Page 117

23 
17. Performance Indicators 
In line with best practice in asset management, condition surveys have been carried out across
the Council’s operational property assets to support informed capital and revenue investment
planning. While these surveys offer a visual assessment of the physical condition of buildings,
the PMI team also works closely with service users to evaluate the suitability of each property
for its intended function and service delivery. 
By assessing both condition and suitability, the Council is better positioned to determine
whether an asset is critical to service delivery and should be retained. This approach also helps
identify whether targeted investment could either extend the life of the asset or enhance its
usability to better meet service needs. 
The combined grading of condition and suitability forms the basis for strategic investment and
performance decisions. All operational properties are included in a rolling programme of
assessments to ensure data remains current, supporting proactive and effective estate
management. 
The table below shows examples of the APSE/SCOTS performance indicators used to
measure performance of the property assets: - 
Performance Indicator 2021/22 2022/23 2023/24 2024/25 2025/26
(target)
CP_19 Proportion of
operational buildings that are
suitable for their current use
(LGBF)
91.1% 95.1% 95.2% 95.4% 93%
CP_25 % of Council
dwellings that meet the
Scottish Housing Quality
Standard (LGBF)
49.3% 63.2% 76.9% 94% 97.4% 
18. Action Plan 
Action Plan
Reference  Action  Desired Outcome  Lead  Timescale
PAMP_A01 Review governance
arrangements relating
to asset management
to ensure that
strategic asset
management reflects
best
practice.
NAC will have a
property estate which
is being managed
appropriately and in
accordance with
current guidance.
PMI Complete

Page 118

24 
PAMP_A02 Continue
implementation of new
CAFM system to
replace current
software.
A new CAFM system
will result in asset
management
becoming integrated
in officers’ daily
duties, making
workload more
efficient, and
providing required
data seamlessly.
PMI Ongoing
PAMP_A03 Review existing asset
management
approach to ensure
information is used
appropriately to
influence investment
decisions and future
asset management
strategies.
A more robust
process is
established for
identifying investment
priorities, ensuring
key stakeholders are
included in strategic
decision- making.
PMI Complete
PAMP_A04 Develop performance
indicators that reflect
a robust system of
financial management
achieves value for
money.
A set of KPI’s are
formed to highlight
success and
improvement
opportunities.
PMI Complete
PAMP_A05 Prepare a detailed
condition survey
programme to identify
sequence for all future
inspections.
A 5-year cyclical
condition survey
programme is
established, providing
full transparency for
services and
management, and
ensure all buildings are
attended to in a
timeous manner.
PMI Complete
PAMP_A06 Conclude review of
new Insurance claim
process.
An agreed method
for processing all
insurance claims,
reducing delays and
impact on end-user.
PMI /
Insurance
Complete
PAMP_A07 Finalise PLI capital
project commitments for
the upcoming 3 years.
A programme is
created for planned PLI
projects giving
opportunity for
collaborative works with
other teams/ services.
PMI Ongoing
PAMP_A08 Complete a data
cleanse of existing
property asset files in
K2 and update where
required.
Obsolete and
superseded data
entries on the current
CAFM system is
removed, ensuring the
asset register is
accurate and ready for
transition to a new
system.
PMI Complete

Page 119

25 
PAMP_A09 Ensure fire plans are
present and correct, in
accordance with new
UFAS changes.
All fire plans are
accurate (building
layout, fire system
devices, legislation and
guidance correct) to
align with H&S, FRA
and Insurance
concerns.
PMI Ongoing
PAMP_A10 Complete the review of
all rationalisation
workstreams (analysis
works)
All opportunities have
been fully assessed
(external and in-house
reviews), and
outcomes then
available to present to
Transformation Board.
Transformation
/ PMI
Complete
PAMP_A11 Complete the estate
surveys of RAAC
All NAC operational
properties with the
potential to contain
RAAC have been
surveyed and remedial
actions received.
PMI Complete
PAMP_A12 Prepare a strategy for
upgrading the Council
estate to meet ZDE
targets.
Collaborative exercise
with E&S identifying
energy efficiency
actions in the existing
properties to
Sustainability /
PMI
Ongoing
PAMP_A13 Following completion of
the Ph. 1 rationalisation
review (PAMP_A10), a
follow-on review should
focus on the remaining
assets through the
Locality Based Property
Review.
Identify further savings
and capital receipts
opportunities through
property rationalisation.
Transformation
/ PMI
May-26
PAMP_A14 Complete a review of
Streetscene Depots.
Improve
accommodation and
identify options to
consolidate buildings.
Streetscene/
PMI
Mar-26
PAMP_A15 Collaborate with ICT
and Transformation
team to complete the
commercial co-location
of NAC’s primary data
centre and disaster
recovery centre to off-
site locations.
Significant reduction in
energy usage of CH;
off-site facility provides
carbon neutral power
supply; cost avoidance
of forming a new DR
facility and required
upgrade of data centre;
provides a more
resilient ICT strategy.
PMI/ ICT/
Transformation
Nov-26
PAMP_A16 Review boiler plant and
replace gas-fired
appliances with more
environmentally friendly
heating systems, e.g.
ASHP, electrical
heating powered from
solar PV, wind turbines.
Reduce the reliance for
fossil fuels by
transitioning to an
estate that runs on
renewable sources of
power and aids the
Council’s Net Zero
targets.
PMI/ Energy &
Sustainability
Ongoing

Page 120

ASSET MANAGEMENT PLAN 
ROADS 
Version Owner Date
1.4 Head of Neighbourhood
Services 
30/05/2025

Page 121

Page 2 of 44 
CONTENTS        PAGE      
1  Introduction        3
2  Aims & Objectives           3
3  General Description       4
4  Current Performance/Drivers for Change    7
5  Condition and Suitability      9
6  Sufficiency (i.e., asset demand)      12
7  Financial        21
8  Legislation        25
9  Policy/Guidance       26  
10 Health and Safety        26
11  Risk Management       28
12  Governance of the assets      30
13 Service Delivery Aspirations/Challenges    31
14 How assets will be used in the future    33 
15 Performance Indicators       34
16 Action Plan        35
17 Glossary        37
18 Appendix A - Maintenance Hierarchy – Mainland & Cumbrae 39
19 Appendix B - Maintenance Hierarchy – Arran    40
20 Appendix C - Carriageway Prioritisation Criteria   41
21 Appendix D - Footway Priority System    42
22 Appendix E - Structures Priority System    43

Page 122

Page 3 of 44 
1. Introduction 
This Road Asset Management Plan (RAMP) sets out the Council’s approach for the
management and maintenance of its road assets.   
2. Aims & Objectives 
Road Asset Management 
Road Asset Management is defined in the County Surveyors Framework for Highway Asset
Management as: 
‘a strategic approach that identifies the optimal allocation of resources for the management,
operation, preservation, and enhancement of the highway infrastructure to meet the needs of
current and future customers’. 
This definition brings together themes that define an asset management approach: - 
Strategic Approach – adopting a strategic approach to maintain and renew the asset and
make best use of available resources for the long-term benefit of the asset. 
Optimal Allocation of Resources – investment is allocated to prioritise the delivery of
corporate objectives and to provide best value to our customers.  Asset management provides
a framework for this process by identifying and prioritising needs across the network as a
whole.  Lifecycle planning is used to minimise whole life costs to ensure efficient and effective
use of resources. 
Customer Focus – considering the needs and expectations of customers is addressed by
developing appropriate levels of service for each asset. 
Through prudent asset management, North Ayrshire Council will make best use of available
resources in maintaining its road network and associated infrastructure. 
Council Plan 
The importance of asset management is evident in how well managed and maintained road
infrastructure contributes to the Council Plan 2023-28 Priorities: 
Priority – Wellbeing 
• Ensure our places and spaces where we live, work and visit are well maintained and
accessible
• Developing infrastructure to support business growth 
Priority – Climate Change 
• Improving resilience and reducing carbon by developing and supporting supply chains
where materials and goods are sourced locally.
• Developing and promoting active travel infrastructure.
• Transitioning to low and zero carbon travel.
• Coastal adaptation work and the Flood Risk Management Plan both look at measures
including, studies and options to address the most serious impacts of climate change.

Page 123

Page 4 of 44 
Priority - A Sustainable Council 
• Ensuring robust governance arrangements are in place to fulfil the Council’s statutory
duties, manage risk and support delivery of key priorities.
• Working with partners nationally, regionally and locally to secure investment and target
resources towards our priorities.
• Focusing our investment on priorities
• Effective workforce planning ensuring that we have the right skills/resources to deliver
priorities. 
3. General Description 
The Council’s adopted road asset is made up of:- 
Asset Quantity        
(31st March 2025) Unit
Carriageway – Mainland 887.3 km
Carriageway – Arran 167.4 km
Footways/footpaths 1028.63 km
Bridges & Culverts 406 no.
Car Parks 68 No.
Retaining Walls 118 No.
Street Lighting Columns 24,408 No.
Traffic Signals 81 No. of sets
Vehicle Activated Signs 49 No.
Non-illuminated Signs 12,413 No.
Illuminated Signs/Bollards 2,045 No.
Pedestrian Guardrail 10,750 m
Grit Bins 561 No.
Safety Fences 40,575 m
Street Name Plates 3,673 No.
Cattle Grids 11 No.
Verge Marker Posts 4,465 No.
Weather Stations 2 No. 
Asset Management Planning Documentation 
The following documents are produced to support the asset management process and are
reviewed and updated regularly: 
Road Asset Management Plan – records the service standards for each asset group,
identifies risks, reflects local traffic levels, customer preferences and current investment
strategies.

Page 124

Page 5 of 44 
Data Management Plan – records methods for collection, validating and updating of asset
data and an action plan for improvements regarding estimated or missing data. 
Road Asset Valuation Report – provides information on data used in the valuation, methods
of calculation and interpretation of results. 
Performance Report – APSE/SCOTS results 
Improvement Action Plan – to support the asset management planning process. 
Customer Information Report – provides current customer information 
APSE / SCOTS Customer Questionnaire – help us understand the customer expectations
and experiences of winter gritting, road works and other road maintenance related matters. 
Road Maintenance Manual – defines how and when each asset group is inspected,
categorisation of repairs, condition assessment, prioritisation methods and procurement and
management of works. 
Annual Status Report – provides a summary of the status of each asset group in meeting
service standards. 
Road Risk Register – details of risks to implementation of the plan 
Works Programme – a Strategic List of Priorities is provided from which the annual
programme is determined. 
Other Road Assets 
There are a number of road infrastructure assets currently not covered within the RAMP that
require data to be collected to ensure a complete overview of the Councils’ responsibilities. 
♦ Drainage systems are not covered by this plan.  There is limited recorded information
on drainage.  New drainage installed or existing drainage that is being worked on, is
included in the recording procedures for asset changes.  Historic plans of drainage will
ultimately be fully recorded on GIS.  This element will form part of the new SCOTS
asset management project. Sustainable Urban Drainage Systems (SuDs) are an
integral part of all new development. Developers are required to install a SuDs as part
of their drainage infrastructure. NAC have signed up to the Memorandum of
Understanding with Scottish Water that states that Scottish Water will be responsible
for the below ground assets and the council will be responsible for the above ground
asset. As part of the construction consent process, the above ground assets form part
of the developments factor arrangements. 
♦ Road & Lighting Infrastructure that is not part of the adopted road network is not
currently included within this RAMP.    Work has commenced to collect lighting,
carriageway, and footway condition data for Housing areas, and limited information
regarding additional road infrastructure out with the adopted road network has been
recorded.  A methodology for the prioritisation of maintenance on these assets is being
developed.  Further work is required to ascertain how the financial valuation of these
non-adopted assets should be reported.  There is a list of additional assets recorded
within the GIS system as they are highlighted, and further assets will continue to be
added to the list as they are identified.

Page 125

Page 6 of 44 
♦ Private Roads and Footways – those not on the list of public roads. This also includes
non-adopted council assets, such as promenades, car parks, council properties and
open space paths. 
♦ Urban road verges within residential areas – mainly grassed and maintained by     
Streetscene 
♦ Cycle paths – not forming part of existing carriageways or footways/footpaths  
♦ Private Bridges (including Network Rail and Sustrans structures) 
♦ Roadside Trees that are within the extents of the adopted road network. Trees are
inspected by the Streetscene service when any issues are highlighted by members of
the public or the Roads Inspector. If required, the roads service will serve notice on a
neighbouring landowner to action any problems identified with the tree. 
Flooding Assets 
The Flood Risk Management (Scotland) Act 2009 confers certain powers and places specific
duties on Local Authorities to help them manage flood risk in their areas. Flooding assets
are varied and can include both built and natural features, which are not always located on
Council owned land. 
Flood Risk Management assets can be either:
1. An asset that is subject to Council intervention, which is necessary to reduce the risk
of a flood that is likely to occur imminently and have serious consequences. These
types of assets are only identified in urgent situations and may generally be
maintained by another asset owner at other times. 
2. A relevant body of water that has been subject to an assessment, which finds that
clearance and repair work would substantially reduce flood risk; The Schedule of
Clearance and Repair that is published on the Council’s website (available at
https://www.north-ayrshire.gov.uk/Documents/FloodProtection/2019-20-clearance-
and-repair-schedule.pdf) lists the trash screens, watercourses and culverted
watercourses that are regularly cleared and repaired. Note only works that would
substantially reduce flood risk can be undertaken.
3. A formal flood protection scheme. There are Flood Protection Schemes at Largs,
Saltcoats, Millport, and the Upper Garnock. The standard of protection offered by
these schemes rely on both the maintenance of these assets and on the operation of
flood gates, barriers and other features that are part of the schemes.  
4. An asset located on Council owned ground that provides a flood risk management
function. Examples can include built or natural coastal defences, Council owned
drainage infrastructure etc.

Page 126

Page 7 of 44 
4. Current Performance / Drivers for Change 
Service Standards 
The following service standards apply to the road asset and define the level of service that
customers can expect.  The standards allow the appropriate prioritisation of resources within
available funding.  Details of how the specific measures are calculated are included in the road
maintenance manual. 
Service Measure Target Standard 
Carriageways 
Safety
Response times to Category 1 defects 4 hours 
(24h on Isle of Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency – Strategic
routes
12 times per year
Routine safety inspection frequency – Main
Distributor routes 
12 times per year
Routine safety inspection frequency - Secondary
Distributor routes
12 times per year
Routine safety inspection frequency – Link roads 4 times per year
Routine safety inspection frequency – all other
routes and car parks
once per year
Utility Inspections 
% of Sample A Inspections completed against
number of potential inspections
100%
% of Sample B Inspections completed against
number of potential inspections
100%
% of Sample C Inspections completed against
number of potential inspections
100% 
Condition
Maintain RCI  32%
Maintain condition of A Class Roads at target
levels
30%
Maintain condition of B Class Roads at target
levels
30%
Maintain condition of C Class Roads at target
levels
40%
Maintain condition of U Class Roads at target
levels
33% 
Footways 
Safety
Response times to Category 1 defects 4 hours
(24h on Isle of Cumbrae)
Response times to Category 2 defects 5 working days
Response times to Category 3 defects 60 working days
Routine safety inspection frequency – footways
associated with strategic, main and secondary
routes
12 times per year
Routine safety inspection frequency – footways
associated with link roads 
4 times per year

Page 127

Page 8 of 44 
Service Measure Target Standard 
Footways 
Safety
Routine safety inspection frequency – Castlepark
and Lower Vennel
Twice per year
Routine safety inspection frequency – all other
footways and footpaths
Once per year
Condition Maintain % of footways requiring maintenance at
current levels
13% 
Street Lighting 
Safety % of street lanterns with a valid Electrical Test
Certificate
40%
Condition
% of lamps restored to working condition within 7
days
96%
% of lanterns that exceed their Expected Service
Life should be no more than
20%
% of columns that exceed their Expected Service
Life should be no more than
20% 
Structures 
Safety
Carry out General Inspections  2 yearly
Carry out Principal Inspections 6 yearly
Condition
Response time to emergency calls 4 hours
Target figure for Average Bridge Stock Condition
Indicator
86.4
Target figure for Critical Bridge Stock Indicator 75 
Traffic Signals 
Safety
Response time to attend urgent faults 2 hours
Repair/make safe time for urgent faults 4 hours
Response and repair time for non-urgent faults 12 working hours 
Details of our Road Hierarchy are shown in Appendix B 
Road Condition 
The table below shows the Road Condition Indicators for North Ayrshire Council reported as
Statutory Performance Indicators and the comparison with the Scottish average.  Road
condition improved from 2014 to 2016 as a result of asset management practices using
lifecycle planning to target investment to make optimum use of available resources.  Road
condition deteriorated slightly by 1.3% between 2014-16 and 2016-18, additional budget
invested in roads infrastructure in 2017/18 and 2018/19 stabilised road condition and further
additional investment contributed to an overall improvement in road condition.  There was a
marginal deterioration in the % of the road network that should be considered for maintenance
treatment reported in 2023, however additional investment in road infrastructure
improvements in 2022/23 and 2023/24 have assisted in further improving road condition by
2.3% for 2024.   Reported road condition has improved further in 2025 with a Road Condition
Index of 30.6% - an improvement of 1.9% from 32.5% reported in 2024.  An improvement of
8.5% over 10 years and our lowest reported RCI.  The RCI is now shows a 4.1 % improvement
against the Scottish average of 34.7%.  Our position in Scotland has improved from the 4th
quartile to the 2nd with North Ayrshire now 9th out of 32 authorities.

Page 128

Page 9 of 44 
RCI Comparison to Scottish average 
2012
-14
2013-
15
2014-
16
2015-
17
2016-
18
2017-
19
2018-
20
2018-
21*
2020-
22
2021-
23
2022-
24
2023-
25
North
Ayrshire  40.8 39.1 37.8 38.3 39.1 38.1 37.3 37.1 33.9 34.8 32.5 30.6
Scottish
average 36.7 37.0 36.7 36.4 36.7 36.3 35.8 35.5 34.2 33.6 34.1 34.7
Comparison
to Scottish
average
+4.1 +2.1 +1.1 +1.9 +2.4 +1.8 +1.5 +1.6 -0.3 +1.2 -1.6 -4.1
Overall
Ranking 21st 20th 20th 22nd 26th  23rd 23rd 23rd 20th  22nd  16th 9th
* 3-year composite PI due to issues completing survey during covid19 
5. Condition and Suitability 
Customer Surveys, Enquiries and Consultation 
A Roads Service customer survey was undertaken in 2013.  The survey covered customer
contact and levels of satisfaction with various areas of the service – winter service, road
maintenance, street lighting.  The surveys identified that although we were delivering a high-
quality service in the works being carried out, the condition of the roads and footways was
perceived to be in decline. 
North Ayrshire took part in the National Highways and Transport (NHT) Networks survey in
2016.  This survey measures public satisfaction with highways and transport services across
the UK with results shared on the NHT website to encourage benchmarking and drive
improvement. 
Contract specific questionnaires are distributed after completion of contracts to properties in
the vicinity of works.  These results are recorded on a customer survey database to provide
information for future improvements to be incorporated into Service Delivery.   
The Roads Service now participates in the APSE / SCOTS customer satisfaction survey to
enable benchmarking between other Scottish authorities. This is an online survey managed
by APSE that is available to all local authorities to use, and it asks a set of standard questions
which are specific to your own council area. This survey is always open for members of the
public to access, and available on our website. However, a review of the data collected
indicates that activity is generally as a result of specific social media promotions of the survey
as shown below.

Page 129

Page 10 of 44 
The results of the customer satisfaction surveys can be found in the Asset group Status reports
in Section 6 - Sufficiency. 
A communications campaign will be launched in Winter 2025 to generate another set of
responses so that we can update on a 3 yearly basis. 
North Ayrshire Council has a procedure in place for recording and dealing with complaints. 
Details of general enquiries are recorded in the Verient EMPro System and all reported defects
are recorded in WDM Highways Integrated Asset Management System (HIAMS).  This
information highlights numbers of specific types of fault or faults occurring in a geographical
area.   
North Ayrshire Council also has representatives who attend various meetings to ascertain
views and/or requirements – e.g. North Ayrshire Access Panel, Community Groups and Estate
Based Inspections.  Responses are also sought via the North Ayrshire Community Planning
Partnership People’s Panel that is comprised of 2000 representatives of the population of
North Ayrshire. 
Consultation is undertaken through the Locality Partnerships for local people within
communities; set in North Coast and Cumbrae, Three Towns, Garnock Valley, Arran,
Kilwinning and Irvine.  This identifies and addresses local issues, sets out priorities for each
locality and how they can be addressed within a developed Locality Plan. 
We work closely with Arran Community Council, Visit Arran and other key stakeholders to
consult on works programmed to be undertaken on the Island of Arran to ensure that disruption
is minimised and that any concerns are addressed.  
Public consultation exercises are undertaken prior to final design decisions being made about
major projects – for example, consultation was carried out across West Kilbride to consider
improvements to traffic management in the town and also in Gateside to agree traffic calming
measures to improve safety.  Consultation is also undertaken through local press releases for
traffic orders and proposed road closures. An extensive series of consultations was held
during the development of the Millport Flood Protection Scheme. 
Condition 
SCOTS BACKLOG MODEL 
A study was completed in 2010 using the 2007 and 2008 SRMCS data to determine the effect
of applying different maintenance budgets to the Scottish local public road network.  This
concluded that the budget required to return to the position where the carriageway is in a good
state of repair (the Headline Backlog figure) was £1.539bn.  The model was re-run using 2009
and 2010 SRMCS data in order to determine the effect of the February 2010 winter weather
resulting in a new figure of £1.729bn, an increase of 12.33%.  Analysis of information in 2015
identified that the budget required to remove all carriageway defects in 1 year in North Ayrshire
was £30.9million.  Due to the impact of inflationary increases in material and contractor costs,
the backlog figure was re-calculated again in 2017, 2019 and 2023.  2017 figures were further
revised based on the 2019 Scotland wide treatment costs to provide a comparison with the
2019 figures and this process was followed again in 2023 to compare against the 2019 figure. 
The figures are calculated based on a set of Scotland-wide treatment costs to provide a sound
basis for comparison between family groups, although any comparisons must still be treated
with caution as the widths of carriageway used in the calculations are a combination of actuals
and estimates provided by individual authorities.

Page 130

Page 11 of 44 
Backlog figures for North Ayrshire Council (updated in 2023) 
Utility Activity 
Utility activity can have a major effect on the maintenance and management of the road
assets.  There are currently no recorded figures to quantify the effect that utility openings have
on the road structure, but it is widely believed that these lead to an increase in defects and
earlier deterioration of the road surface than would otherwise be expected.  All statutory
undertakers are responsible for carrying out their own reinstatements and the new fifth edition
of “Specification for the Reinstatement of Openings in Roads” introduced a 6-year guarantee
on these works. 
This change was the result of the Office of the Scottish Road Works Commissioner
undertaking a review of the long-term damage that can result from utility activity.  This included
a review of the existing 2-year guarantee period, and it was felt appropriate to change this to
a 6-year period, with some minor exceptions. 
The graph above shows high levels of work for telecoms operators, these are due to the
national rollout of high-speed fibre broadband. This has resulted in telecoms poles being
erected in residential areas in addition to an increase in excavations in order that new ducting
can be laid to provide accessibility for all residents. 
North Ayrshire Council work closely with utility companies to try to minimise the effects of utility
works on the travelling public and to ensure that, as far as is possible, newly surfaced roads
are not disturbed for a minimum period of 3 years.  However, in the event of emergency works
being required or new service connections, the utility companies must be allowed to carry out
their works.

Page 131

Page 12 of 44 
6.  Sufficiency (Asset Demand) 
There is a constant demand for improved road infrastructure for driving, walking, cycling and
accessibility.   
Environmental factors also impact on both deterioration of the road network and the solutions
that can be found to address the challenges of providing a sustainable network for the
travelling public. 
Environmental Factors 
- Climate change – changeable weather conditions with severe weather extremes
becoming more common result in rapid deterioration of the road network.  Landslides
undermining roads on Arran have resulted in prolonged closures on both the Ross
Road and at Kildonan within recent years as a result of heavy rainfall.   Further, re-
routing of traffic due to prolonged closures results in heavy vehicles causing damage
to alternative roads not constructed to withstand either the volume or type of traffic.
- Winter weather – harsh winter weather, particularly the extreme low temperatures
becoming more common causes significant damage to road surfaces 
- Flooding – flooding is becoming more common due to prolonged periods of intense
rainfall with historical drainage systems unable to cope.  This further leads to rapid
deterioration on rural roads where there is little or no formal drainage in place.
- Electric Vehicle Charging has introduced a number of new assets within public car
parks to allow members of the public access to charge their vehicles.
- Electric cars are around twice as heavy as standard vehicles and are expected to
cause increased deterioration to road networks, with further deterioration resulting from
the introduction of electric buses and lorries which are significantly heavier
- Materials are constantly under review to see if there are more sustainable and
environmentally friendly products available that meet the required standards. Recycled
materials are considered for use where appropriate.

Page 132

Page 13 of 44 
Asset Group Status Reports 
The status of the major asset groups that make up the road asset as of April 2025 are
summarised in the following pages: - 
Carriageways Statistics Commentary
The Asset
North Ayrshire Council has 1055 km of public road network. 
Growth of 1% over the last 5 years. 
Growth of 13 km over the last five years. 
Predicted growth over the next 5 years
of 0.2% per year. 
Customer
Expectations 
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
satisfaction with the maintenance of
our roads.  The 2016 NHT survey
indicates the low level of satisfaction
with the condition of our roads.   
This decrease in satisfaction with our
road network is despite an
improvement in overall road condition
and indicates the increasing
expectations of the community. 
A roads customer survey created
jointly by APSE/SCOTS to enable
national satisfaction comparison was
made available. It asked, how satisfied
or dissatisfied are you with the
condition of roads, this indicates that
the satisfaction level has now dropped
to 16%. 
A winter survey carried out in 2013
indicated that 70% of the community
are satisfied with the winter service
provided. The APSE / SCOTS survey
in 2022 shows that the level of
satisfaction with the winter service has
remained the same. 
Condition 
SRMCS results in 2017/19 indicate
that 38.1% of our carriageways may
require attention – approximately
400km. 
Reported road condition has improved
further in 2025 with a Road Condition
Index of 30.6% The RCI now indicates
a 4.1 % improvement against the
Scottish average of 34.7%.  Our
position in Scotland has improved from
the 4th quartile to the 2nd with North
Ayrshire now 9th out of 32 authorities. 
Continued investment levels in road
maintenance since 2020/21 should
assist in maintaining current
condition.
0%
10%
20%
30%
40%
50%
% Satisfied with Maintenance of
Roads
70%
30%
Overall Satisfaction with Winter Service
Satisifed
Dissatisfied

Page 133

Page 14 of 44 
Investment           
Historical 
These figures include capital and
revenue investment in planned
maintenance works. 
The investment figures include
planned kerbing works (as per
financial accounting guidelines),
planned patching and works carried
out for external contractors. 
The carriageway investment plan
includes £3.8m Capital Investment
and £0.5m Revenue.  These
investment levels were set to maintain
steady state in road condition.  The
reported steady state figure in 2019
increased to £4.3m and again in 2023
to £5.5m.
Valuation
(Figures recalculated by
SCOTS in 2023) 
Steady State figure £5.5million (2023)   
(Increased from £3.8m in 2017 & £4.3m in 2019) 
Cost per year to maintain the current
Road Condition Indicator (RCI). (1)
Headline backlog figure is £38.6million. (2023)  Budget required to remove all defects
in one year. 
Planned
Future Investment 
It was calculated in 2019 that £11.1million per year is
required to prevent further deterioration across the network. 
This is the depreciated replacement cost figure for the asset
and does not include for increasing materials and
construction costs. 
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran.  Increased costs are estimated
to be 50% for materials and transport.
No distinction is made between capital
or revenue funding.
Forward Works
Programme
The forward investment plan that was developed using Road
Condition data and Inspectors surveys which also takes
account of identified community priorities to provide options
for optimising investment is reviewed annually. This is due
to changes as a result of rapid deterioration in some areas. 
Locations identified are subject to
annual re-assessment.  Our system is
utilised to identify the optimum
strategy for long term planning for road
maintenance which maximises budget
efficiency for both Arran and the
Mainland. 
(1) The Steady State calculation is based on investment required to ensure carriageways currently in amber condition do
not deteriorate to red condition, and carriageways currently in good condition do not deteriorate to requiring maintenance
treatment.  This figure does not include treating all carriageways currently requiring major maintenance works as those in red
condition will not deteriorate further

Page 134

Page 15 of 44 
Footways Statistics Commentary
The Asset 
North Ayrshire Council has 1028.6 km of footway/footpath
network. 
Growth of 1.01% over the last 5 years. 
An extra 9.8 km of footway to be maintained. 
With new developments being
constructed as shared spaces without
footways, the predicted growth over
the next 5 years is 0.15% per year. 
Predicted increase in footway length
of 2 km over the next 5 years. 
Customer Expectations   
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 show a decrease in
satisfaction with the maintenance of
footways and footpaths.  The NHT
survey indicates that this increased to
54% of respondents  satisfied with the
condition of footways. From the
APSE/SCOTS survey in 2022 we saw
a decrease to 46%. 
Footways are third only to safe roads
and good road condition as the most
important assets to our customers. 
Condition  
Condition Assessments are
undertaken by the Road Inspectors as
part of their inspection programme on
an annual basis. 
Condition assessments carried out on
the footway network indicate that
around 11% of our footway/footpath
network is currently in need of
maintenance treatment and this is
approximately 114km. 
0%
10%
20%
30%
40%
50%
60%
70%
% Satisfied with
Footway/Footpath Surfaces
Roads being
in good
condition
24%
Safe Roads
24%Good
Pavements
22%
Good Street
Lighting
21%
Good Cycle
Facilities
9%

Page 135

Page 16 of 44 
Investment Historical 
Planned footway maintenance
includes footway resurfacing/
reconstruction and planned footway
patching. 
Additional investment in 2016/17 was
as a result of capital investment in
town centre regeneration projects,
however remaining years have stayed
relatively stable. 
It is expected that footway condition
will decrease unless the level of
investment is increased.  Footways
are maintained annually using our
revenue budget, capital investment is
required to provide planned
improvement. 
Planned
Future Investment 
It was calculated in 2019 that £1 million per year is
required to prevent further deterioration in the footway
network. This figure does not include for increasing
materials and construction costs. 
This figure does not take into
consideration the additional costs
associated with surfacing works on
Arran.  Increased costs are estimated
to be 50% for materials and transport.
No distinction is made between
capital or major revenue funding. 
Forward Works
Programme 
All footways requiring maintenance treatment are assessed
according to our priority assessment matrix. This lists all
footways requiring maintenance works in order of priority. 
Locations identified are subject to
continual re-assessment.

Page 136

Page 17 of 44 
Structures Statistics Commentary
The Asset 
The Structures asset consists of: 
254 Road Bridges
33 Footbridges
118 Retaining Walls
119 Culverts
10 Underpasses
31 Revetments 
The figure for the length of retaining
walls is estimated.   
There are two flood protection
schemes recently completed: Upper
Garnock (dam) and Millport (sea
defences). 
Customer Expectations  100% of requests relating to abnormal loads are responded
to within service response times. 
There have been no adverse
comments in respect of Structures. 
Condition  
The Bridge Condition Indicators
require that Principal Inspections (PIs)
are undertaken over a 6 year cycle.  A
combination of a backlog of PIs and
limited capital investment has resulted
in a deterioration of bridge condition. 
Capital investment from 2016/17
onwards has seen the rate of decline
reduce in BSCIs. 
General Inspections (GIs) are
undertaken 2 yearly.  
Investment Historical 
These figures represent revenue
expenditure only from 2013/14 to
2015/16. The application of asset
management to maintenance of the
structures asset resulted in planned
Capital investment of £560,000
annually for maintenance of Structures
assets from 2016/17 until 2033/34. 
Further additional Capital investment
of £300,000 was made in 2018/19 to
carry out improvement works.

Page 137

Page 18 of 44 
Planned
Future Investment 
Estimated Outstanding Maintenance Work Required 
Value of outstanding maintenance
work for the Structures asset is
estimated to be £8.6million. 
This estimate is based on the
inspections that have been carried out
to date and may rise as inspections
are reviewed. 
A formalised process for establishing
the ongoing, long-term budgetary
requirements for the maintenance of
the Structures Asset, is being further
developed to build upon existing
Capital Programme Asset Group
(CPAG) work.   
Forward Works
Programme 
The capital programme is identified based on the structures
prioritisation methodology which ranks assets based on a
number of factors including condition, safety, and usage. 
The revenue programme is based on
priorities from identified maintenance
work, this is adapted throughout the
year due to defects of a higher priority
being identified through the annual
inspection process. 
All works are subject to continual re-
assessment.  The capital programme
may be revised as a result of higher
priorities being identified through
results of inspections. 
Road
Bridge
Replaceme
nt/Strengt
hening
37%
Footbridge
Replacement/
Strengthening
24%
Culvert
Replacement/
Strengthening
2%
Parapet
Upgrades
32%
Scour
Protection
5%

Page 138

Page 19 of 44 
Lighting Statistics Commentary
The Asset 
No. of luminaires 26,198
No. of columns 24,408 
Over the last 5 years the no. of luminaires has increased
by 2592 reflecting a rise of 1.1% and the no. of lighting
columns has increased by 1250; a rise of 1%. 
The growth pattern is expected to
remain constant due to additional
infrastructure as part of new
developments.  In addition,
infrastructure replacement works will
continue to increase the number of
lighting points to reflect current design
spacings.
Customer Expectations  
Roads Services customer surveys
carried out in 2005, 2009 and repeated
in 2013 indicated an increase in
satisfaction with the provision of street
lighting.  The NHT survey shows a
decrease in the level of satisfaction
with street lighting. 
The lower level of satisfaction may be
due to the introduction of LED lighting
which is being installed across North
Ayrshire as part of an energy efficiency
programme.  These ensure that the
lighting is concentrated onto the road
network thereby reducing light spread
onto surrounding private areas,
gardens and pathways. 
The APSE/SCOTS survey now shows
that the level of satisfaction for street
lighting has remained the same as the
2016 survey at 72%. 
In 2024/25, 53% of enquiries and
service requests recorded for the
Service were regarding Street
Lighting.  This is compared to 42% the
previous year. This may partially be a
result of public reaction to the changed
perception of lighting levels from the
installation of LED lighting, but is also
partially resulting from policy decision
to remove night-time fault inspection
arising from longer life LEDs.  
Condition  
The number of lanterns exceeding
expected service life has decreased by
75% since 2013/14, due largely to bulk
LED lantern changes despite
fluctuations in Capital investment. 
The increase in the number of columns
exceeding service life may have been
affected by estimated historic
installation date records and will also
be affected by reprofiled capital
investment in the years 2019-21. The
age profile of lighting assets is variable
dependent on original development or
bulk spend and over years can
account for differences in age expired
units. Overall the profile is managed
through use of structural safety
inspections which allow targeted
replacement and budget setting to
maintain at least a static depreciation. 
0%
20%
40%
60%
80%
100%
% Satisfied with Street Lighting
Provision

Page 139

Page 20 of 44 
Investment Historical 
Level of historic investment reflected
the ongoing £1m approx. required
annually to maintain existing lighting
infrastructure depreciation. Reprofiled
Capital in 19/20 resulted in reduced
investment to £750k.  This has been
restored in later years. 
An increase in investment from
2014/15 to 2017/18 is due to a major
spend to save energy initiative to
introduce LED lanterns into approx.
60% of the network. This resulted in an
energy efficiency saving of an
estimated £570k per year.  However,
reduction in energy and carbon has
been offset by significant increased
energy costs since 2022. 
Planned
Future Investment 
Capital Investment
2015/16 - £2,654,000
2016/17 - £2,222,000
2017/18 - £1,460,428
2018/19 - £1,000,000
2019/20 - £750,000
2020/21 - £750,000
2021/22 - £1,940,000
2022/23 - £1,250,000
2023/24 - £1,000,000
2024/25 - £1,000,000 
The additional spend to save
investment was completed in 2017/18
reducing investment thereafter to the
ongoing £1M approx. annual
investment to maintain the lighting
infrastructure depreciation at status
quo. However, reprofiled investment
over financial years 2019 – 2021
impacted these statistics with an
increase in units exceeding life
expectancy.  There was also a further
identification of £690k energy
efficiency funding in 21/22 for earlier
installed white lighting units to be
converted to LED. The capital
allocation is now planned to be £1m
until 2033/34. 
Forward Works
Programme 
Structural inspection programme of risk certification is
ongoing. 
Priority major infrastructure replacement programme is
drawn from inspection, age profile and asset profile
information. 
Continued structural inspection
manages risk between priority
replacement and interim inspection
certification.

Page 140

Page 21 of 44 
7. Financial
Historical Expenditure 
Historical expenditure on the Road Asset over the last 5 years is shown in the table below: 
1 Planned carriageway expenditure includes externally funded improvement works and additional
allocated budget 
2 Revenue footway budget remains at £250k, externally funded improvements, generally on shared
paths, have increased investment on the footway network.  In addition, footway improvements are being
included as part of capital carriageway resurfacing projects 
3 Additional Capital investment allocated for Structures planned improvement works from 18/19 onwards 
4 Total spend as internal works claims are not broken down into work types. 
Expenditure on street furniture and traffic management systems have been excluded from
these figures as maintenance is based upon ongoing inspection regimes which determine
repairs/replacements to be carried out on a needs basis. 
Planned Investment 
Service standard targets and investment strategies are based on available budgets detailed
in the table below.  Any changes to these predicted budget levels will require changes to both
service standard targets and investment programmes.  These budget figures are based on a
10-year plan and can vary annually depending on grant funding and further budget allocations. 
Due to internal payment management systems with internal service providers, it is not possible
to break down lighting costs to equivalent figures for cyclic, reactive and planned work types. 
The breakdown shown for long term funding reflects the annual capital grant and revenue
budgets for the lighting service broken down to an estimated split. 
20/21 21/22 22/23 23/24 24/25
£ £ £ £ £
Reactive 885,282 987,755 637,259 1,222,465 1,389,399
Routine 224,136 184,966 280,516 385,257 254,592
Planned 1 4,047,703 5,642,824 5,205,937 6,409,790 4,932,957
Footways 2 Planned 528,053 538,415 530,857 1,298,006 649,930
Winter Maintenance CW and FW 611,076 452,926 503,585 602,185 605,147
Structures Total 3 623,258 1,102,570 1,068,433 755,475 861,851
Cyclic
Reactive
Planned
Asset Works
Carriageways
2,316,660 1,986,949 1,759,401Lighting (excluding
energy costs) 4 1,554,331 1,828,918
26/27 27/28 28/29 29/30 30/31
£ £ £ £ £
Reactive / Routine 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
Planned 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000
Reactive / Routine 130,000 130,000 130,000 130,000 130,000
Planned 250,000 250,000 250,000 250,000 250,000
Reactive / Routine 130,000 130,000 130,000 130,000 130,000
Planned 560,000 560,000 560,000 560,000 560,000
Reactive / Routine 320,000 320,000 320,000 320,000 320,000
Planned 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
Flood Protection Reactive / Routine 200,000 200,000 200,000 200,000 200,000
Millport Pier Planned 984,960
B714 Improvements Planned 15,499,584 11,488,805
Asset Works
Carriageways
Footways
Lighting (excluding energy costs)
Structures

Page 141

Page 22 of 44 
Investment Strategies
The strategies in this section have been determined using predictions of future condition over
a 10-year period.  The predictions enable strategies to be created to look at the whole life cost
of maintaining the asset.  Using long term predictions means that decisions about funding
levels can be taken with due consideration of the future maintenance funding liabilities that
are being created. Investment strategies for the major asset types are summarised below. 
These strategies are designed to enable the service standards in section 5 to be delivered.
Investment between Asset Types 
In comparison to historical investment future investment is planned to be:
− Carriageways:  level of investment - £3.8m Capital planned investment annually, expected to
be maintained until 2033-34. Revenue contribution to planned investment expected to be
maintained at £500,000.  These figures do not meet the current steady state figure of £5.5m
calculated by SCOTS to maintain existing road condition, however additional investment
provided annually since 21/22 has assisted in improving road condition
− Footways:  level of planned investment decreased to £250k to assist in maintaining
carriageway investment levels, grant funding for active travel and footway improvements as
part of capital carriageway works have increased the level of investment annually in the
footway asset.
− Structures: level of investment increased from 2016/17 to enable a programme of
improvements.  Additional Capital investment of £300,000 was granted in 2018/19. Investment
of £560,000 is expected to remain steady going forward.
Street lighting; level of investment was increased until 2017/18 as part of a ‘spend to save’
initiative to introduce modern efficient LED lighting. Capital investment of £1M annually
required to keep pace with annualised depreciation, was reduced in 2019/20 and 2020/21 to
£750k before reprofiled increase in subsequent two years.  The immediate impact of this was
an increase in depreciated assets which resulted in reprofiling to £1.25m in the following two
years to stabilise the annual depreciation figures by 2024/25. The level of investment is now
expected to remain at £1m until 2033-34. The original business as usual annual energy use
for 2013/14 was 8,001,389kWh. Having converted just under 90% of the stock to LED has
resulted in the current annual energy use dropping to 4,391,432kWh for 2024/25. 
Carriageways
The investment strategy for carriageways is to optimise investment by using life cycle planning
to undertake targeted improvements to ensure that efficiency of spend is maximised. This will
increase investment in lower cost treatments, although investment will also support higher
cost resurfacing where carriageways are in poor condition.  The budget available is insufficient
to undertake a full preventative programme as there are areas of major deterioration that must
be addressed for public safety.  The strategy is to minimise deterioration by optimising
available investment in order to maintain current condition.

Page 142

Page 23 of 44 
The above illustration shows that by applying road asset management principles the whole
life cost of maintaining the asset is greatly reduced. The use of preventative maintenance
treatments at the optimum intervention timings extends the life of the asset leading to less
need for reactive and planned maintenance.
The budget currently allocated for planned maintenance is insufficient to meet the steady state
figure calculated by SCOTS to assist in maintaining current road condition as measured by
the Road Condition Index.  A programme of carriageway screeding is planned annually to
improve our rural road network.
A method of prioritisation is utilised in addition to Scottish Road Maintenance Condition survey
data to target investment for long term planning.  Carriageway prioritisation data is included at
Appendix C. 
Footways
The strategy for planned improvement works to footway is to develop a long-term programme
for footway improvements using our prioritisation matrix (Appendix D).   
Preventative treatments have been used in previous years in residential streets but had poor
feedback from the public.  As a result of this, all town centre footways are resurfaced in asphalt
with white limestone chips or to meet public realm requirements, but all other footways are
now resurfaced with a 6 or 10mm asphalt concrete finish as this is a more efficient use of
limited funding for footway improvements.  Although initial feedback has been varied on this
matter, it is more acceptable to our residents than the extended use of thin surfacing
treatments.   
To move to programming investment in our footway network using lifecycle planning, there is
a requirement to use a range of treatments.  As thin surfacing treatments are further
developed, they will be trialled, and the results analysed to enable lifecycle planning to be fully
implemented and investment optimised across our footway network.

Page 143

Page 24 of 44 
Routine and reactive repairs are expected to continue at current levels and will be undertaken
within available budgets. 
Structures
The structures maintenance strategy is to use available funding to ensure the safety of the
travelling public by maintaining the structures in a serviceable condition. The methodology
used to allocate Revenue and Capital funding is outlined below. 
Revenue
Works carried out under the revenue budget are generally reactive and routine works identified
through the inspection regime and/or reported defects from the public. 
Works identified, where there is insufficient budget to immediately carry out repairs and where
they are not prioritised due to safety reasons, are recorded in the Work Bank which is a list of
works to be completed as funding is available. 
The maintenance strategy attempts to balance the need to complete essential reactive works,
whilst allocating funds to routine preventative and corrective works identified through
inspections.  A reduction in routine maintenance will accelerate the rate of deterioration of the
asset. 
Capital
A capital budget has been allocated to the structures asset from 2016/17.  This is enabling a
programme of strengthening and replacement to be put in place. 
These works will be prioritised using the structures prioritisation methodology and a
programme of works established. The Structures Prioritisation Matrix is contained in Appendix
E. 
The annual capital budget allocated is £560,000.  This means that the current list of works
required would take approximately 16 years to compete. 
Street Lighting
The investment strategy for lighting is to continue to use lifecycle planning to undertake
targeted improvements of the overall asset infrastructure by using the prioritisation of profiled
deteriorated, age expired and energy improvement opportunities.  This is to ensure that the
asset remains safe and fit for purpose and avoids collapse and injury, such as that
experienced in 2023 in Glasgow. 
The funding available currently for infrastructure replacement will not be sufficient to improve
the age/condition profiles, however the overall strategy is to minimise further deterioration of
the asset profile by keeping pace with annualised depreciation. 
However, the short term reduced Capital investment resulting from reprofiling will increase the
annualised depreciation cost; increase poor condition assessment statistics; increase the
impact of energy increases, carbon tariffs and unplanned reactive repairs on future revenue
budgets until the balance is redressed from increased spend in subsequent years. 
The Capital funding will continue to be required to support annual replacement of deteriorated
support column and cable infrastructure on those locations which have been converted to
energy savings lanterns, as those supporting networks themselves become deteriorated and
age expired.

Page 144

Page 25 of 44 
8. Legislation
Legislation can lead to increased demand on Local Authorities’ resources in managing their
road assets. The following list is legislation requirements currently in place that have an impact
on the Road Service and should be taken account of: 
- Roads (Scotland) Act 1984
- New Roads and Street Works Act 1991
- Transport (Scotland) Act 2005
- Transport (Scotland) Act 2019
- Flood Risk Management (Scotland) Act 2009 
- Disabled Persons Parking Places (Scotland) 2009 
- Traffic Signs Regulations and General Directions 2016
- Reform of red diesel and other rebated fuels entitlement
- Public Health etc. (Scotland) Act 2008 (Artificial Light Nuisance)
- Health and Safety at Work Act 1974
- Electricity at Work Regulations 1989
- Environmental Protection Act 1990
- Clean Neighbourhoods and Environmental Act 2005
- Climate Change (Scotland) Act 2009 
As well as the above primary legislation, there are also secondary legislations, these are
Regulations and Orders that are made under the enabling powers provided by primary
legislation in order to implement and administer the requirements of that primary legislation.
- The Road Works (Reinstatement Quality Plans, Qualifications of Supervisors and
Operative and Miscellaneous Amendments) (Scotland) Regulations 2023
- The Scottish Road Works Register (Prescribed Fees) Regulations 2022
- The Scottish Road Works Commissioner (Imposition of Penalties) Regulations 2022
- The Road Works (Qualifications of Operatives and Supervisors) (Scotland)
Amendment Regulations 2019
- The Road Works (Inspection Fees)(Scotland) Amendment Regulations 2014 
The following national policies and guidance documents also have an impact on the service
provided:
- Well-Managed Highway Infrastructure: A Code of Practice
- Safety at Street Works and Road Works: A Code of Practice
- Designing Streets Manual for Scotland 
- SCOTS National Roads Development Guide
- SUDS Section 7 agreements may create further maintenance responsibilities in
relation to sustainable drainage systems.  Section 7 agreements state that the Roads
Authority and Scottish Water may agree to the provision, management and
maintenance or use of their sewers or road drains for the conveyance of water bringing
shared responsibilities for systems.
- Cycling by Design
- BS 7671:2018 The Requirements for Electrical Installations
- BS 5489-1-2020 Design of Road Lighting : Code of Practice 
9. Policy/Guidance

Page 145

Page 26 of 44 
The following policies associated with the Roads asset have been approved by the Council
Members: 
- Council Plan
- Performance Management Framework
- Corporate Procurement Strategy
- Place Directorate Plan
- Roads Operational Plan
- Road Asset Management Plan
- Permission for Attachment of Amenity Displays
- Arran Lighting Policy
- Lighting Energy Efficiency Strategy
- Local Transport Strategy
- Winter Service and Weather Emergencies Plan
- Road Asset Safety Inspection Policy
- Sustainable North Ayrshire Strategy
- Regeneration Delivery Strategy
- Flood Risk Management Plan
- Local Flood Risk Management Plan 
- Flood Resilience Plan 
Guidance
- Well Managed Highway Infrastructure - Code of Practice
- BS 5489-1-2020 Design of Road Lighting – Code of Practice 
10. Health and Safety
The assets are managed in accordance with Well Managed Highway Infrastructure – A Code
of Practice.  The code highlights a statutory obligation on Highway Authorities to maintain the
public highway and embraces the 2 essential functions of Safe for Use and Fit for Purpose. 
- Safe for Use requires carriageways to be managed in such a way that they do not pose
an unacceptable risk to public safety. 
- Fit for Purpose requires carriageways to be managed in such a way that they remain
available for use by traffic permitted for the route. 
Road Safety information and details of initiatives to promote road safety are available
from SharePoint\General\All Departments\SCOTS Asset Management Project\Road
Safety. 
Structures assets are managed in accordance with the Code of Practice for
Management of Highway Structures.  The code highlights a statutory obligation on
Highway Authorities to maintain the public highway and embraces the 2 essential
functions of Safe for Use and Fit for Purpose. 
- Safe for Use requires a highway structure to be managed in such a way that they
do not pose an unacceptable risk to public safety. 
- Fit for Purpose requires a highway structure to be managed in such a way that they
remain available for use by traffic permitted for the route.

Page 146

Page 27 of 44 
Regular inspections of structures identify problem areas that require urgent rectification or
the imposition of other safety measures such as the implementation and enforcement of
weight or height restrictions. 
The lighting assets are managed in accordance with Well Managed Highway Infrastructure
– A Code of Practice  The code highlights a statutory obligation on Highway Authorities to
maintain the lighting asset and embraces the 2 essential functions of Safe for Use and Fit for
Purpose. 
- Safe for Use requires lighting plant to be structurally & electrically safe. 
- Fit for Purpose requires lighting to be operational or to restore inoperative lighting within a
defined time. 
The lighting levels and outputs are defined within British Standard BS5489-1:2020 A Code of
Practice for the Design of Road Lighting and within the ILP Guidance Note 01/21: The
Reduction of Obtrusive Light (JM) and are based on type of road and night-time use of road,
environmental area and whether an alternative lit route is available. 
Works carried out which involve traffic management, excavation or working at height are
progressed in accordance with the legislative framework provided within.
- The New Roads and Street Works Act 1991
- The Working at Height Regulations
- The Electricity at Work Regulations 1989 
Overarching requirements in respect of climate change are managed with respect to Climate
Change (Scotland) Act 2009.

Page 147

Page 28 of 44 
11. Risk Management 
This section summarises how the council’s risk management strategy is applied to the
management of the road asset.  It identifies where risks associated with the road asset are
recorded, identifies the major risks associated with the asset and outlines how they are
currently being controlled. 
Corporate Risk Management Strategy
The Corporate Risk Management Strategy provides a framework through which risk can be
identified and managed, thereby reducing the Council’s exposure to loss.   
Risk Identification
The Roads management team identifies significant strategic risks impacting upon the priorities
outlined in the Councils Plans. 
Risk Categorisation
A risk assessment matrix is used to identify the level of risk associated with carriageway and
footway defects and to categorise and prioritise repairs accordingly.  There is a long-
established process in place to risk assess and prioritise defects related to structures. 
Risk Control 
Risks within the Roads Service are controlled by carrying out inspections in accordance with
Codes of Practice, adherence to the winter policy and compliance with the Flood Resilience
Strategy. 
Monitoring and Reporting 
Risk is continually monitored by the Roads management team and reported to the Corporate
Management Team through quarterly performance reports and through the Roads Operational
Plan. 
Risk Register 
A corporate risk register has been produced and this contains the risks associated with
Neighbourhood Services.  A summary of the risks associated with the Roads Service are
recorded in the following table: 
Risk Strategic / Corporate /
Operational
Climate Change Operational
Financial Variation on Flood Scheme Operational
Flood Programme Risk Operational
Energy Pricing   Corporate
Sustainability of Asset Management
Model (Capital Investment)
Operational
Decriminalised Parking / Legislative
Changes
Operational
Workforce Demographics /
Contingency Capacity Risk
Operational
Recruitment / Retention Corporate

Page 148

Page 29 of 44 
Reputation Risk Corporate
Fuel Resilience Operational 
Specific risks associated with the Roads asset are recorded in the following table: 
Risk Controls Monitoring Process 
Reduced resources
leading to a
reduction in levels of
service and an
increase in
complaints and legal
claims 
Road Asset Inspection
Policy 
Prioritisation scheme
for works
Regular monitoring of
performance
achievable with
allocated resources 
Number of 3rd party
liability claims 
Number of defects
reported 
Failure of street
lighting electrical
networks leading to
dark area or
electrical accidents
or injury
Statutory Inspection
Regime 
Number of units with
valid electrical
inspection
Failure of street
lights leading to
accidents
Regular inspection
programme in place
and investment in
replacement
programme
Number of reported
dark lamps
Failure of street
lighting structures
leading to damage
or injury
Regular inspection
programme in place
and investment in
replacement
programme.
Number of age expired
units with valid
structural inspection
certification
Flooding leading to
service and local
transport disruption
and associated
financial cost
Emergency plans for
flooding 
Flood Risk Strategy
Regular inspection of
trash screens and
culverts  
Severe winter
weather or failure of
proactive winter
procedures leading
to traffic disruption
and impact on the
local economy
Annual review of winter
maintenance policy. 
Operative training in
winter procedures 
% of priority routes
completed on time 
Ongoing review of
measures in place
throughout the winter
period.

Page 149

Page 30 of 44 
12. Governance of the Assets 
Plan Management 
The Head of Neighbourhood Services is responsible for management and control of the plan,
and the Senior Managers (Roads and Engineering Services) are responsible for its
implementation. 
This Roads Asset Management Plan (RAMP) will be presented to Members as a component
of the overall Corporate Asset Management Plan. 
Major projects are report via the Place Major Project Meeting and to the Executive Leadership
Team (ELT) where appropriate. 
Plan Review 
The plan will be reviewed annually as part of the Council’s service planning and budget setting
exercise and in response to planned changes within the delivery of Council services.

Page 150

Page 31 of 44 
13. Service Delivery Aspirations/Challenges 
The roads infrastructure asset is constantly changing as a result of changes in legislation,
active travel improvements, public transport infrastructure improvements, the introduction of
electric vehicles charging points, requirements for traffic calming measures, and to meet
community aspirations. 
Asset Growth 
In addition to the above reasons for asset growth, this also arises from the adoption of new
development sites.   
The carriageway asset has increased by 1.01% over the last 5 years, which has resulted in
an additional 12.9 km of carriageway to be inspected and maintained. This increase included
an additional 3.56km from the de-trunking of the A737 through Dalry. Due to the increase in
new housing developments, it is expected that the carriageway asset growth will increase at
approximately 0.2% per year.  Growth of our footways/footpaths over the same period was
9.8km representing a 1.00% increase over the same 5-year period, this is expected to
decrease by 0.15% per year due to the increased use of shared surfaces and the resultant
decrease in footway provision. 
The number of lighting columns has increased by approximately 1.05% over the last 5 years. 
This rate of growth is due both to adoption of new development sites and increased numbers
resulting from improvement of lighting to current standards. This trend is expected to continue. 
The number of traffic signals remains relatively static with any increases due to a requirement
to regulate traffic flow on busy routes and to provide safe crossing points for the public. A
number of driver feedback signs are provided, all of which have been installed in the last 12
years. 
New infrastructure that isn’t going to form part of the public road network and appear in the
List of Public Roads is classified as non-adopted assets. These mostly consist of new
cycleways and remote paths. These are not recorded as part of the adopted network assets
but do increase the inspection and maintenance liability of the service. 
Flooding has seen a significant capital investment in recent years and this has resulted in
several large-scale flood prevention schemes, namely, Largs Seawall, Garnock Flood
Prevention scheme and Millport Flood Prevention. 
Increasing demand for speed reduction measures is likely to continue, particularly as a result
of the ongoing assessment of 20mph limits for residential streets as part of the Scottish
Governments National Strategy to ensure all appropriate roads in built up areas have a speed
limit of 20mph by 2025.  The installation of traffic calming measures and associated signage
further incurs additional maintenance costs. 
Traffic Growth 
Demand for traffic management measures and parking availability as a result of increased car
ownership has resulted in an increasing number of enquiries and requests for the service to
‘do something’ to alleviate the problem.  It is hoped that improvements in public transport, and
cycling/walking facilities will encourage active travel and have an impact on the level of
demand on the road infrastructure. 
Traffic movements are also affected by roadworks and changes to the trunk road network
resulting in increased loading on carriageways not designed for high levels of traffic.  A shift

Page 151

Page 32 of 44 
in local traffic patterns took place with the opening of the 3 Towns by-pass in 2005 and again
with the opening of the new Dalry Bypass in April 2020. The opening of the 3 Towns bypass
resulted in significant deterioration of the B714 as a result of increased traffic volumes, partly
due to drivers choosing to use the B714 as an alternative route when traffic management is in
place in Kilwinning.  It is anticipated there will be another change in future years when the
realignment and improvements on the B714 are complete.   
With the proposed B714 improvement works it is expected that there will be an increase of
traffic through Kilwinning while works are being undertaken, however this should only be a
temporary situation while the public find alternative routes to avoid the construction work. 
Road Equivalent Tariff (RET) was introduced on ferry routes to Arran with a reduction in fares
for the travelling public. There is currently no information available on any increase in vehicular
traffic as a result of this however, anecdotal information suggests a significant increase due to
the influx of tourists, with private cars and bus tours throughout the summer months further
contributing to the deterioration of Arran’s roads.  There are projected figures for increases in
timber transport calculated from predicted volumes of timber to be felled in future years.  It is
estimated that haulage traffic had increased by 39% between 2012-2016 and 2017-2021, the
demands placed on the road network by timber haulage is expected to continue. 
Traffic Composition 
Traffic composition is considered where deterioration in the road surface requires repeated
maintenance. 
There are a number of rural routes where constant maintenance is required due to heavy
traffic causing damage to roads of sub-standard construction. A survey undertaken on a
number of our C class routes established actual volumes of heavy traffic. It was determined
that the C80 (Whiskey Bond Road) experienced the highest volume at 27% HGV traffic,
compared to the other surveyed routes that had an average of 2%. High volumes of buses
and lorries were also noted on the C118 Routenburn Road (27%) and C41 Brisbane Glen
Road (20%) compared to an average of 16% over the 8 surveyed routes.  Cars and light goods
vehicles accounted for only 55% of the vehicular traffic using the C80.  This study highlighted
the need to determine appropriate treatment options for these routes to consider the type and
volume of traffic using them; or to look at alternative routes, if possible, for this traffic. 
A programme of improvements to rural roads is ongoing to provide for more permanent
solutions to maintaining the road surfaces. 
Rural roads are not designed or in a state to be used by heavy goods or large numbers of
vehicles. The C87 from Whitehurst Park to the A737 is a short cut used by residents and
haulage firms trying to avoid going through Kilwinning town centre. This has resulted in this
road requiring significant maintenance with layout changes being implemented as well.

Page 152

Page 33 of 44 
14. How assets will be used in the future 
Local Transport Strategy
The Local Transport Strategy 2023 – 2028 will help improve the transport network in North
Ayrshire and its connectivity beyond to create an attractive place for businesses and
communities to thrive. The new Local Transport & Active Travel Strategy sets out the policies
to be adopted and the actions to be implemented to guide the planning and improvement of
the local transport and active travel networks. It also outlines behaviour change initiatives
aimed at supporting and encouraging people to use the sustainable transport networks more
often. A detailed action plan identifies actions and priorities for the period of the strategy. The
new Local Transport & Active Travel Strategy refers to all types of transport, including walking,
wheeling, cycling, bus, rail, ferry and car and considers how to integrate these types of
transport to make travel by several modes easier for all. The Local Transport Strategy may
result in additional public transport and walking/cycling routes that will result in increasing
future maintenance costs. 
North Ayrshire Council is committed to implementing low maintenance solutions, where
possible, for example widening existing footways to create shared footway/cycleways rather
than constructing separate new cycleways that would incur additional inspections costs.

Page 153

Page 34 of 44 
15. Performance Indicators 
The table below shows some of the main APSE/SCOTS performance indicators used to
measure performance of the roads assets.   
Performance
Indicator
2019/20 2020/21 2021/22 2022/23 2023/24  2024/25 Target
RDS_PI010 -
Percentage of top
priority winter
gritting routes
completed on time
98.76 98.74 99.2 98.6 99.54 99.62 99.7
CP_20  (RCI) - % of
overall road network
that should be
considered for
maintenance
treatment 
37.3 37.1 33.9 34.8 32.5 30.6 32
SOL_ENV04b - %
of Class A roads
that should be
considered for
maintenance
treatment
38.8 36.3 29.9 30.7 28.92 26.7  30
SOL_ENV04c - % of
Class B roads that
should be
considered for
maintenance
treatment
36.8 32.6 29.4 28.9 27.41 25.5 30
SOL_ENV04d - %
of Class C roads
that should be
considered for
maintenance
treatment
46.9 44.9 39.4 39.9 38.5 36.8 40
SOL_ENV04e - %
of unclassified
roads that should be
considered for
maintenance
treatment
33.7 35.6 33.9 35.4 32.36 30.5 33
RDS_PI008 - Bridge
Stock Condition
Indicator (average
BSClav)
85.7 86.1 85.8 86.4 83.11 82.76 86.4

Page 154

Page 35 of 44 
RDS_PI009 - Bridge
Stock Condition
Indicator (BSCIcrit)
75.3 75.6 74.2 74.8 68.52 68.04 75
OP_PL_LIGHT_01 -
% of lamps restored
to working condition
within seven days
93.9 94.8 94.7 96 94.97 91.69 96
OP_PL_LIGHT_06a
- Average annual
electricity
consumption per
street light (kw
hours)
199.6 192 184.9 184.9 182.48 174.31 170
RDS_PI003 - % of
street lights which
are LED
60.8 61.9 65 79.5 84.53 87.83 90
The target for RCI % of road network that should be considered for maintenance treatment is
to maintain current road condition.  The targets for the A, B, C and Unc roads are variable due
to the differences in survey timings and %s of each classification of road that are surveyed
annually. Road condition can deteriorate quickly as a result of inclement weather, subsidence
and material failures. 
Further performance information is reported through SCOTS/APSE to enable benchmarking
between authorities in Scotland and assist in sharing and learning through best practice. 
16. Action Plan 
Asset Management Plan Action Plan 
The following actions have been identified as the Road Asset Management improvement
actions and are recorded on Covalent.
Action Ref Action Lead Timescale
RAMP_A22 Integrate Roads & Building
Services lighting operational and
financial management systems
Lighting
Manager
March 2026
RAMP_A23 Review & Update Road Lighting
Policy to incorporate guidance on
Non-Road Assets and other
services impacts
Lighting
Manager
March 2026
RAMP_A38 Review existing TTRO currently in
place to progress permanent
orders were appropriate.
Team
Leaders
Network
March 2026

Page 155

Page 36 of 44 
RAMP_A40 Assess the cost effectiveness of
footway replacement options,
including kerb renewal
Team
Leaders
Network
March 2026
RAMP_A41 Progress inclusion of identification
non-adopted assets in the
gazetteer to enable addition to
existing planned inspection cycles.
Team
Leader
Asset
Management
March 2026
RAMP_A43 Approval & publication of the local
coastal change adaptation plans for
Stevenston and Irvine.
Team
Leader
Flooding
March 2026
RAMP_A44 Prepare progress report on the
Ayrshire local flood risk
management plan.
Team
Leader
Flooding
March 2026
RAMP_A45 Develop procedures and
performance indicators to align with
the requirements of the Scottish
Road Works Register (SRWR)
Team
Leader
Asset
Management
March 2026
RAMP_A46 Investigate the potential for the
reintroduction of a Quality
Management System, including the
review of existing and new
procedures required for the Roads
Service.
Team
Leader
Asset
Management
March 2026
RAMP_A47 Develop prioritisation matrix for
Scour Protection needs and
integrate these requirements into
the existing works prioritisation
programme.
Team
Leader
Structures
March 2026
RAMP_A48 Identification of bridge supports
which are vulnerable under vehicle
impact. Create database with
mitigation measures to be
implemented and prioritised based
on risk.
Team
Leader
Structures
March 2026

Page 156

Page 37 of 44 
17. Glossary 
The following abbreviations are used in this plan: 
ACoP 
ADC 
AMP 
APSE 
BCI 
BSClav 
BSClcrit 
CSS 
DRC 
GRC 
HGV 
IA 
LCP 
LTS 
NRSWA 
RAMP 
RAUC(S) 
RCI 
RMS 
SCOTS 
SRMCS 
SRWR 
SPI 
TRO 
WDM 
WGA 
Approved Code of Practice 
Annualised Depreciated Cost 
Asset Management Plan 
Association for Public Service Excellence 
Bridge Condition Indicator 
Average Bridge Stock Condition Indicator 
Critical Bridge Stock Condition Indicator 
County Surveyors Society 
Depreciated Replacement Cost 
Gross Replacement Cost 
Heavy Goods Vehicle 
Improvement Action 
Lifecycle Plan 
Local Transport Strategy 
New Roads and Street Works Act 
Road Asset Management Plan 
Roads Authorities and Utilities Committee (Scotland) 
Road Condition Indicator 
Roads Management System 
Society of Chief Officers of Transportation in Scotland 
Scottish Road Maintenance Condition Survey 
Scottish Road Works Register 
Statutory Performance Indicator 
Traffic Regulation Order 
Williams Detail Management Limited 
Whole of Government Accounts

Page 157

Page 38 of 44 
The following terms are used in this plan: 
Annualised
Depreciation   
The cost of annual deterioration of the road network if no
maintenance works are carried out. 
Asset
Management
A strategic approach that identifies the optimal allocation of
resources for the management, operation, preservation and
enhancement of the Road infrastructure to meet the needs of
current and future customers. 
Asset Valuation The calculation of the current monetary value of an authority’s
assets.   
Depreciation  The systematic allocation of the depreciable amount of an
asset over its useful life arising from use, ageing, deterioration
or obsolescence. 
Depreciated
Replacement
Cost 
Method of valuation which provides the current cost of
replacing as asset with its modern equivalent asset less
deductions for all physical deterioration and all relevant forms
of obsolescence and optimisation. 
Gross
Replacement
Cost
The monetary cost of replacing the existing asset with a
modern equivalent asset. 
Levels of
Service 
A statement of the performance of the asset in terms that the
customer can understand. 
Lifecycle Plan  Document defining the standards applied to an asset and
detailing the management processes used to deliver those
standards. 
Public Realm Publicly owned streets, pathways, right of ways, parks, publicly
available open spaces; all areas to which the public has open
access 
Road
Infrastructure
Assets
An authority’s portfolio of road assets including roads,
segregated footpaths and cycle routes, structures, lighting,
traffic management systems, etc.  Together they function as a
system or network which as a whole is intended to be
maintained at a specified Level of Service (assessed through
performance measures) by the continuing replacement and
refurbishment of its assets and elements. 
Section 7
Agreement
A Roads Authority and Scottish Water may agree to the
provision, management, maintenance or use of their sewers or
road drains for the conveyance of water from the surface of a
road or surface water from premises and that neither party shall
unreasonably refuse to enter into such an agreement or insist
on terms or conditions unacceptable to the other party. 
Statutory
Undertakers
Various companies and agencies with legal rights to carry out
works on the road.

Page 158

Page 39 of 44 
18. Appendix A – Maintenance Hierarchy Mainland & Cumbrae

Page 159

Page 40 of 44 
19. Appendix B – Maintenance Hierarchy Arran

Page 160

Page 41 of 44 
20. Appendix C – Carriageway Prioritisation Criteria 
The annual carriageway resurfacing programme is developed using WDMs UKPMS Scheme
Manager software. 
This takes into consideration the following data when determining prioritisation of
carriageways for inclusion in the works programme. 
The following road condition data sources are used:
• Scottish Road Maintenance Condition Survey Data
• RoadAI Condition Data
• SCRIM 
Primary condition data sources utilised for each classification of road are:
A, B & C roads are using SRMCS 
U class are using RoadAI 
Local Rankings are also included:
• Accident Data
• Road Hierarchy
• Defects 
Scheme Manager produces a prioritised list of carriageways in need of maintenance
treatment.  This includes a determination of the most efficient treatment type i.e. surface
treatment, thin surface or inlay/overlay, taking into account its condition and lifecycle.
The outputs from Scheme Manager are then compared to the Locality Inspectors annual
Condition Assessments to identify any areas that may not have been highlighted through
this process.

Page 161

Page 42 of 44 
21. Appendix D – Footway Priority System

Page 162

Page 43 of 44 
22. Appendix E – Structures Priority System
Structure Name: 
Date when the scoring is carried out:
Structure Net score % of
Maximum Score total Score
No. Factors Score Input
1
Type of Bridge 1 Score 1 if road bridge and 0
if foot bridge
Culverts, Subways which carry road shall be
considered as road bridge as per this scoring
system. Structures which carry only pedestrians,
cyclists and equestrians shall be considered as
footbridge.
1
NA
2 Route Factor 40 Score based on NAC route
hierachy
Route hierachy 0 0 0%
Cat 2 - SPT/ NAC strategic routes - 40
Cat 3a - Main distributor routes - 30
Cat 3b - secondary distributor routes - 20
Any other category - 10
Routes serving fewer than 5 properties - 5
3 HGV Restriction 20 Score based on weight capacity Weight restriction 0 0 0%
factor 3 tonnes - 20
7.5 to 13 tonnes tonnes - 15
18 tonnes - 10                 
26 to 38 tonnes - 5
No weight restriction - 0
4
Condition factor 10 Score based on the condition of
the bridge
Sliding score based on 0 for very good condition
to 10 for poor condition. (10 - (BCI crit/ 10)) 0 0 0%
5
Deterioration
factor
10 Score based on the rate of
deterioration of the structure
Sliding score based on 0 for very slow
deterioration to 10 for rapid deterioration 0 0 0%
6
Pedestrian
factor
30 Score based on pedestrian usage.
Bridges with footways of heavy
pedestrian usage shall score a
maximum of 30.
Structures with footways in heavily used urban
areas score 30. Score 30 if route is access to a
school or railway station. Apply a sliding scale
going down to 0 for rural structures without
footways.
0 0 0%
7
Flooding factor 40 Score based on the potential for
the existing structure to
contrubute to flooding
A structure that makes no contribution to
flooding risk will score 0. Structures that are
know to increase the risk of flooding due to
restrictions in width or soffit height will score 30.
0 0 0%
8
Scour factor 60 Score based on risk of collapse
due to expose to scour in heavy
flow conditions
Risk of collapse of structure due to scouring.
Structures which have been deterioted severely
because of inadequate scour protection and on
verge of collapse score maximum. Scour risk
based on a sliding scale.
0 0 0%
9
Parapet Condition
Factor
15 Score based on the condition of
the parapets
Structures with substandard Parapets with poor
conditon will score 15 . Structures with
substandard parapets with a 'monitor only'
recommendation will score 10. Structures which
have parapets to current standards will score 0.
0 0 0%
10
Parapet Risk
Factor
10 Score based on risk  in the event
of a parapet collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting high
risk injury or even death while the parapet is
open to use considering the condition of the
structure. Risk based on a sliding scale. 0 -5 100%
11
Delay factor 20 Score based on whether existing
restrictions such as limited width
cause delays at the structure
Structures where delays are caused by width,
weight, height or other restrictions such as
traffic lights will be given a score higher than
zero. Delays less then 2 minutes at peak times
will score 10 and longer than 2 minutes will score
20. Score maximum if fire station, railway station
or hospital affected by delay.
0 0 0%
12
Structure Risk
factor
10 Score based on risk  in the event
of a Structure collapse leading to
high risk injuries and human
casualties.
What is the likelihood of someone getting a high
risk injury or even death while the structure is
open to use considering the condition of the
structure. Risk based on a sliding scale.
0 0 0%
13
Maintenance
factor
30 Score based on maintenance
required to keep the existing
structure open.
Score based on known maintenance history and
requirement. No maintenance requirement will
score 0. Listed structures score 15. 0 0 0%
14
Diversion factor 20 Score based on the length of the
diversion route if the structure is
closed in an unplanned manner
with no finite time limit.
Score based on diversion length. Any diversion
equal to or more than 20 miles scores 20. Score 1
for each mile of diversion up to 20. Score 20 if a
road closure adversly affects a fire or railway
station or hospital. Score 20 if there is no
alternative diversion.
0 0 0%
-5
Structure Name: 
Additional comments

Page 163

Page 44 of 44 
Note maximum score that can be achieved for road bridge= 500
Priority level Chart Structure Name: 
Date of Scoring: 00-Jan-00
Priority Level Indicator Overall works (500) Structure works (100) Parapet works (70) Scour Protection (60)
Level Score Level Score Level Score Level Score
No Action Rquired       
Low Priority       
Medium Priority       
High Priority       
Immediate action required       
Note : Works are divided above into three sub categories as each work can be independent and
each has its own significance in terms of attention required.