NORTH AYRSHIRE COUNCIL 
28 October 2025 
Cabinet 
Title:    Revenue Budget 2025/26 : Financial Performance to 31
August 2025 
Purpose:  To advise Cabinet of the financial performance for the Council at
31 August 2025 
Recommendation:  That Cabinet agrees to: 
(a) note the information and financial projections outlined in the
report; 
(b) note the latest financial projection for the Health and Social
Care Partnership highlighted at 2.6; and
(c) approve the virements detailed in Appendix 8. 
1. Executive Summary 
1.1 The General Services Revenue Estimates for 2025/26 were approved by Council on
26 February 2025. The Housing Revenue Account (HRA) Revenue Budget for
2025/26 was approved by Council on 12 February 2025. 
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the second report for 2025/26 and covers the period to the end of
August 2025 (Period 5). Projections have been made to the year-end. 
1.3  At Period 5 the General Fund is forecasting a net projected underspend of (£0.595m),
(0.1%), after transferring resources to/from earmarked reserves. This is an
improvement from the previously reported breakeven position. 
1.4  The Housing Revenue Account is forecasting a net in-year underspend of (£1.966m),
(3.0%). This is an increase of (£0.456m) from the previously reported underspend. 
1.5  The Health and Social Care Partnership is projecting a year-end overspend of
£5.259m, (1.5%), for 2025/26. This is an increase of £0.068m since the previous
report. The Council services element is reporting a projected overspend of £3.208m
and the Health services element is reporting a projected overspend of £2.051m.
However, previously identified financial recovery actions have reduced the projected
overspend to £1.733m, including £0.957m for Council Services, an increase of
£0.301m from the previous position, and £0.776m for Health services, an increase of
£0.257m.

Page 2

1.6 Ongoing management action to address absence levels has resulted in performance
improvements across services. Although employee absence rates remain above
targets, there has been a 5% reduction in days lost during the period when compared
to the same period last year. 
1.7 Significant risks to the reported position have been identified arising from the recent
and ongoing 2025/26 pay negotiations and the associated funding. While the pay
settlement for non-teaching staff has been agreed, the settlement for teaching staff is
still under negotiation. Current projections include an assumption that any additional
costs in excess of the budgeted provision will be funded by the Scottish Government.
Any shortfall in funding will require the identification of additional recurring resources.
Further risks have been identified in relation to the reported HSCP position which
requires measures to be put in place by the HSCP to address these risks. However,
this position could have an impact on the level of financial contributions from the
funding parties. 
2. Background 
General Fund 
2.1 The Council set a breakeven budget for 2025/26. In addition to the budget approved
on 26 February 2025, earmarked funds of £85.088m were carried forward from
2024/25 for service expenditure in 2025/26 and beyond. These funds are reflected in
the figures within the 2025/26 financial performance reports as they are drawn down. 
2.2 Current financial projections indicate that a net in-year underspend of (£0.595m), net
of transfers to/from reserves, is anticipated for the year to 31 March 2026. The
forecast position will continue to be monitored throughout the year. 
2.3 Details of the current financial projections are summarised in the following table: 
Service Expenditure
App
No.
Annual
Budget
£ million
Projection
to 31
March
2026
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
@ P3
(Fav)/Adv
£ million
Movement
£ million Note 
Corporate Services 1 19.880 19.823 (0.057) (0.007) (0.050) (i)
Education 2 185.451 185.600 0.149 0.735 (0.586) (ii)
Place 3 55.110 55.257 0.147 0.202 (0.055) (iii)
Communities &
Housing 4 14.789 15.005 0.216 0.286 (0.070) (iv)
Other Corporate Items 5 26.958 26.324 (0.634) (0.800) 0.166 (v)
Sub Total   302.188 302.009 (0.179) 0.416 (0.595)  
Health and Social
Care Partnership 9 141.109 141.109 0.000 0.000 0.000  
Balance for Services   443.297 443.118 (0.179) 0.416 (0.595)  
Financing Charges 6 13.854 13.854 0.000 0.000 0.000  
Contribution to Loans
Fund Reserve 6 9.660 9.660 0.000 0.000 0.000  
Total Planned
Expenditure   466.811 466.632 (0.179) 0.416 (0.595)

Page 3

Service Expenditure
App
No.
Annual
Budget
£ million
Projection
to 31
March
2026
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Projected
Variance
@ P3
(Fav)/Adv
£ million
Movement
£ million Note 
Aggregate External
Finance 6 (390.337) (390.337) 0.000 0.000 0.000  
Council Tax 6 (72.009) (72.425) (0.416) (0.416) 0.000  
Use of Earmarked
Funds 6 (4.465) (4.465) 0.000 0.000 0.000  
Total Planned
Income   (466.811) (467.227) (0.416) (0.416) 0.000  
Net Expenditure/
(Income)   0.000 (0.595) (0.595) 0.000 (0.595)   
2.4 The reported Planned Income includes adjustments to Scottish Government funding
from that included in the approved budget, as detailed in the following table:  
Movements on Planned Income
General
Revenue
Grant
£ million
Non
Domestic
Rates
£ million
Specific
Grants
£ million
TOTAL AEF
£ million
Revised Budget 30 June 2025 (339.581) (42.560) (8.101) (390.242)
Ukrainian Resettlement (0.095) 0.000 0.000 (0.095)
Revised Planned Income (339.676) (42.560) (8.101) (390.337) 
2.5 Commentary on Significant Movements from Period 3 
The Council's overall financial forecast against the revised budget is an improvement
of (£0.595m) from the previously reported position. A brief explanation of the
significant movements at a service level are outlined as follows: 
(i) Corporate Services – underspend of (£0.057m), an improvement of
(£0.050m) from the previously reported underspend 
The movement is primarily related to vacancy management across the services. 
(ii) Education – overspend of £0.149m, an improvement of (£0.586m) from the
previously reported overspend 
The movement is primarily related to: 
• Additional Scottish Government grant income to support School Meals Test of
Change for S1-S3 pupils, (£0.417m), with additional costs associated with this
already built into the cost projections; and
• Updated Early Years registration information for funded providers, (£0.202m).

Page 4

(iii) Place – overspend of £0.147m, an improvement of (£0.055m) from the
previously reported overspend 
The movement is primarily related to: 
• Vacancy management across services, (£0.113m); and
• Lower than anticipated vehicle fuel costs, (£0.068m). 
These have been partly offset by additional non domestic rates costs in relation to
vacant properties at Annickbank Innovation Campus and the former Moorpark
Primary School, £0.126m. 
Virements in relation to additional income with the Roads service have been
included within Appendix 8. 
(iv) Communities and Housing – overspend of £0.216m, an improvement of
(£0.070m) from the previously reported overspend 
The movement is primarily related to additional planning fee income. 
(v) Other Corporate Items – underspend of (£0.634m), a reduction of £0.166m
from the previously reported underspend 
The movement is primarily related to updated contingencies and centrally held
inflation provisions. 
Health and Social Care Partnership 
2.6 A copy of the HSCP financial performance report as at the end of July 2025 is
attached at Appendix 9. The report highlights the key challenges and variances for the
Partnership. 
The key points for Cabinet to note are summarised below: 
• The projected outturn is a year-end overspend of £5.259m for 2025/26. However,
this has been reduced to £1.733m due to previously identified financial recovery
actions. This is an increase of £0.558m since the previous reporting period.
• The projected overspend on the Council Services element is £3.208m over the
same period, reduced to £0.957m following the identified financial recovery
actions. This is an increase of £0.301m since the previous reporting period;
• The most significant areas of overspend include care at home, residential
placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and unplanned
activities within the lead partnership for mental health.  Further detail is included in
the report at Appendix 9. 
The main areas of risk identified include: 
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing across
community, mental health and learning disability wards;

Page 5

• Growing demand for services;
• Staff recruitment and retention challenges across a number of service areas;
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges;
• Ongoing delivery costs of Scottish Government policy directives, particularly where
these are not fully funded or inflation proofed;
• Pay settlements for both NHS and Local Government staff have been agreed for
2025/26.  The NHS element has been funded, and the current assumption is that
the shortfall between budget planning assumptions and actual settlements will be
fully funded for Local Government staff;
• Unearmarked reserves are depleted, there is no scope to absorb in-year variances,
with any overspends requiring additional funding from partners;
• The ongoing review of the Integration Schemes, where there is a focus on financial
arrangements and risk share;
• The wider system financial challenges and impact across the whole system, for
example the financial position of NHS AA and the decisions taken to reduce the
Board’s deficit may have impacts on other parts of the health and care system;
• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board approved
financial plan;
• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a heightened
risk of provider failure leading to handing back of care and contracts;
• The ongoing ability to source packages of care for service users;
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this;
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future;
• The use of supplementary staffing for enhanced observations across a number of
service areas and the use of high-cost agency staff to support frontline service
delivery in areas where there are recruitment challenges;
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week;
• Scot Excel inflationary increases for children’s services have been significantly
higher than assumed; and
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be monitored throughout 2025/26. 
Absence Management 
2.7 The programme of work to monitor absence levels and effectively implement relevant
policies has resulted in a significant reduction in reported absence levels across the
Council during the first 5 months of 2025/26. Although the average number of days
lost remains high, at 4.7 days lost compared to the target of 4.25 days, this reflects a
5% reduction in total days lost to absence when compared to the same period in
2024/25. Within the Education Service, the number of days lost for teaching staff has
reduced by 23% when compared to the previous year.

Page 6

Risks 
2.8 The 2025/26 non-teacher pay settlement has been agreed at 4.0%. This compares to
the approved budget provision of 3.0%. Negotiations in relation to the 2025/26 teacher
pay settlement are currently ongoing. All current projections assume that the
additional costs arising from the non-teacher pay settlement and any teacher award in
excess of available budgets will be supported by additional Scottish Government
funding. Any variation between costs and funding may require the utilisation of
Council reserves, with a knock-on effect on future budget gaps. 
2.9 Under the terms of the Health and Social Care Integration Scheme, a recovery plan
must be agreed to address the projected overspend. There is a risk that, if the
recovery plan is not successful, this could have an impact on the level of financial
contributions from the funding parties. 
Housing Revenue Account 
2.10  The Housing Revenue Account budgeted for a breakeven position in 2025/26 and an
in-year underspend of (£1.966m), (3.0%), is currently anticipated for the year to 31
March 2026. This is an increase of (£0.456m) from the previously reported position.
The projected position is summarised in the following table with further details
provided in Appendix 7. 
Housing Revenue
Account
Annual
Budget
£ million
Projection
to  31
March
2026
£ million
Projected
Variance
for year
(Fav)/Adv
£ million
Previous
Variance
@ P3        
(Fav)/Adv
£ million
Movement
£ million Note 
Employee Costs 5.222 5.222 0.000 0.000 0.000  
Property Costs 25.627 25.946 0.319 (0.053) 0.372 (i)
Supplies and Services 2.145 2.167 0.022 0.02 0.000  
Transport and Plant Costs 0.016 0.016 0.000 0.000 0.000  
Administration Costs 2.114 2.118 0.004 0.002 0.002  
Third Party Payments 3.832 3.832 0.000 0.000 0.000  
Transfer Payments 0.177 0.177 0.000 0.000 0.000  
Other Expenditure 0.550 0.550 0.000 0.000 0.000  
Capital Financing 25.549 23.348 (2.201) (1.481) (0.720) (ii) 
Gross Expenditure 65.232 63.376 (1.856) (1.511) (0.345)  
Income (65.232) (65.342) (0.110)        0.001        (0.111) (iii) 
Net Expenditure 0.000 (1.966) (1.966)       (1.510)        (0.456)   
2.11 Commentary on Significant Movements from Period 3 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows:

Page 7

(i) Property Costs – overspend of £0.319m, an increase of £0.372m from the
previously reported underspend position 
The movement is primarily related to increased expenditure on Planned and
Cyclical Maintenance as a result of storm damage and timber and damp works,
£0.446m, Other Property Costs in relation to maintenance of trees, £0.236m, and
Responsive Repairs, £0.213m. 
This has been partly offset by reduced expenditure on Void repairs, (£0.523m). 
(ii) Capital Financing – underspend of (£2.201m), a movement of (£0.720m) from
the previously reported underspend position 
The movement is related to revised phasing of borrowing to support the capital
investment programme, (£0.720m). These funds will be required to support the
HRA capital programme in future years. 
(iii) Income – over recovery of (£0.110m), a movement of (£0.111m) from the
previously reported position 
The movement is related to additional insurance recovery income received,
(£0.110m). 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a)  note the information and financial projections outlined in the report; 
(b)  note the latest financial projection for the Health and Social Care Partnership
highlighted at 2.6; and
(c) approve the virements detailed in Appendix 8. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The net projection for the year as at 31 August 2025 is a net underspend of
(£0.595m). 
Housing Revenue Account
The net projection for the year as at 31 August 2025 is a net underspend of
(£1.966m). 
Human Resources 
4.2 None.

Page 8

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Revenue Budget 2025/26: Financial Performance to 30 June 2025 – Cabinet 2 September
2025

Page 9

Appendix 1
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Chief Executive
Chief Executive 146              157              11                    8%
Total for Chief Executive 146              157              11                    8%
Financial Services
Change Programme 76                76                -                      0%
Audit, Fraud, Safety & Insurance 677              689              12                    2%
Corporate Procurement 729              665              (64)                  (9%) 1         
Financial Services 1,466           1,466           -                      0%
Revenues (533)             (533)             -                      0%
Transformation 761              782              21                    3%
Total for Financial Services 3,176           3,145           (31)                  (1%)
People & ICT
Employee Services 889              841              (48)                  (5%)
HR & Organisational Development 1,152           1,212           60                    5% 2         
ICT 5,038           5,008           (30)                  (1%)
Business Support 1,276           1,276           -                      0%
Customer Services 4,192           4,192           -                      0%
Total for People & ICT 12,547         12,529         (18)                  (0%)
Democratic Services
Legal & Licensing 454              471              17                    4%
Policy, Performance & Elections 508              492              (16)                  (3%)
Communications 472              485              13                    3%
Civil Contingencies 60                60                -                      0%
Committee Services 427              432              5                      1%
Member Services 1,522           1,526           4                      0%
Information Governance 511              472              (39)                  (8%) 3         
Ayrshire Support Service 57                54                (3)                    (5%)
Total for Democratic Services 4,011           3,992           (19)                  (0%)
Totals 19,880         19,823         (57)                  (0%)

Page 10

Appendix 1
Subjective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 16,812         16,701         (111)                (1%)
Property Costs 68                68                -                      0%
Supplies and Services 3,113           3,087           (26)                  (1%)
Transport and Plant Costs 23                23                -                      0%
Administration Costs 1,590           1,656           66                    4%
Other Agencies & Bodies 1,940           1,940           -                      0%
Transfer Payments 860              860              -                      0%
Other Expenditure -                   -                   -                      -
Capital Financing -                   -                   -                      -
Gross Expenditure 24,406         24,335         (71)                  (0%)
Income (4,526)          (4,512)          14                    (0%)
Net Expenditure 19,880         19,823         (57)                  (0%)

Page 11

Appendix 1a
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000 
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement - There has been a favourable movement of (£0.021m) since P3 mainly due to forecasted
underspends in employee costs.
758 (64) -8% Employee costs - There is a projected underspend of £0.064m due to vacancy management.
(64)                 
Note 2 People & ICT - HR & Organisational Development
Movement -  There has been favourable movement of (0.015m) since P3 due to vacancy management.
26 50 192% Admin Costs - There is a projected overspend of £0.050m due to Legal Expenses relating to equal pay.
10 Other minor variances
60                   
Note 3 Democratic Services - Information Governance
Movement - There has been a favourable movement of (£0.017m) since P3, which is mainly due to a decrease
in employee costs.
526 (55) -10% Employee Costs - Underspend of £0.055m due to vacancy management.
16 Other minor movements
(39)

Page 12

Appendix 2
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Early Years Education 20,878         20,585            (293)                (1%) 1         
Primary Education 53,951         53,938            (13)                  (0%) 2         
Secondary Education 66,323         66,271            (52)                  (0%) 3         
Additional Support Needs 17,160         18,662            1,502              9% 4         
Central Education 3,404           3,389              (15)                  (0%) 5         
Pupil Equity Fund 4,728           4,728              -                      0%
Facilities Management 18,855         17,875            (980)                (5%) 6         
Net Total 185,451       185,600          149                 0%
Subjective Summary
Annual
Budget
Final  Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 105,143       105,001          (142)                (0%)
Employee Costs - Non Teachers 50,246         49,507            (739)                (1%)
Property Costs 1,309           1,305              (4)                    (0%)
Supplies and Services 25,114         24,511            (603)                (2%)
Transport and Plant Costs 134              157                 23                   17%
Administration Costs 405              411                 6                     1%
Other Agencies & Bodies 9,511           11,514            2,003              21%
Transfer Payments 580              580                 -                      0%
Other Expenditure -                   -                      -                     
Capital Financing 71                71                   -                      0%
Gross Expenditure 192,513       193,057          544                 0%
Income (7,062)          (7,457)             (395)                6%
Net Expenditure 185,451       185,600          149                 0%

Page 13

Appendix 2a
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Early Years Education
Movement : There has been a favourable movement of (£0.310m) since P3. A previously reported overspend
for funded providers is now on target due to updated early years registration information and further projected
employee costs underspends of £0.108m.
15,308 (325) -2%
Employee Costs: Overall a forecasted underspend of £0.325m.
- Teachers:- forecasted underspend of £0.009m.
- Non Teachers:- forecasted underspend of £0.316m as a result of vacancy management after accounting for 
budgeted turnover.
32 Other minor movements
(293)
Note 2 Primary Education
Movement : There has been an unfavourable movement of (£0.044m) since P3.
51,487 (25) 0%
Employee Costs : Overall a forecasted underspend of £0.025m
- Teachers:- forecasted overspend of £0.053m after accounting for anticipated future absence cover and
budgeted turnover.
- Non Teachers:- forecasted underspend of £0.078m after accounting for budgeted turnover.
12 Other minor movements.
(13)
Note 3 Secondary Education
Movement : There has been a favourable movement of (£0.023m) since P3.
50,388 67 0%
Employee Costs : Overall a forecasted overspend of £0.067m
- Teachers:- forecasted overspend of £0.053m after accounting for anticipated future absence cover and
budgeted turnover,
- Non Teachers:- forecasted overspend of £0.014m after accounting for budgeted turnover.
15,840 (119) -1% Supplies and Services: forecasted underspend in PPP unitary charge mostly due to a reduction in energy costs
(52)
Note 4 ASN
Movement: There has been a favourable movement of (£0.013m) since P3.
15,149 (398) -3%
Employee Costs :  Overall a forecasted underspend of £0.398m
- Teachers:- forecasted underspend of £0.210m after accounting for anticipated future absence cover and
budgeted turnover.
- Non Teachers:- forecasted underspend of £0.188m reflecting the level of turnover within the service.
264 (34) -13% There is a forecasted underspend of £0.034m on payments to Other Local Authorities due to a reduction in the
number of NAC children accessing placements in their establishments.
1,310 175 13%
There is a forecasted overspend of £0.175m on external day placements, as a result of additional children
requiring this level of support, and an increase in rates from these establishments. Currently there are 27
children in, or expected in, day placement provision. This service will continue to be monitored as options for
alternative service provision are developed.
499 1,786 358%
There is a forecasted overspend of £1.786m on external specialist residential placements. Currently there are
14 children in, or expected in, accommodation. Increased pressures on internal care settings as well as
changing needs of children and young people have resulted in an increase in the need for external residential
settings. Joint working is ongoing with HSCP on the Brighter Pathways Programme to ensure that all options
are fully explored to retain young people within their local community where possible. Where this is not
possible, a forum has been set up to further discuss those young people who will require care and education
provision to support them appropriately. Any additional children who enter Residential Accommodation will
increase the future projected overspend.
(27) Other minor movements.
1,502

Page 14

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Central Education
Movement:  There has been a favourable movement of (£0.008m) since P3.
3,196 21 1% Employee Costs: There is a forecasted overspend of £0.021m mainly due to unachieved turnover.
(2,385) (86) 4%
Income:  There is a forecasted over-recovery of PPP insurance rebate of £0.040m and PPP deductions of
£0.050m in excess of budget
50 Other minor movements.
(15)
Note 6 Facilities Management
Movement: There has been a favourable movement of (£0.322m) since P3.  This is mainly due to SG funding
for School Meals - Test of Change S1-3 pupils of £0.417m to offset increased food costs and reduced income.
15,005 (222) -1% Employee Costs: There is a forecasted underspend of £0.483m primarily due to previous vacancy
management, offset by a budgeted turnover target of £0.261m resulting in a net underspend of £0.222m
5,088 (491) -10% Supplies and services: There are forecasted underspends in food and supplies of £0.491m. This comprises of
a £0.475 underspend in kitchen equipment and food costs of £0.016m
(2,365) (282) 12% Income: There is a forecasted projected over recovery in Commercial Catering of £0.123m, cleaning/janitorial
income of £0.061m and school meals income of £0.098m
15 Other minor movements
(980)
Note 7 General
Teacher absence levels are subject to regular review across the service and appropriate actions are being
taken to maximise attendance. Average days lost per FTE is 2.13 for the period April-Aug.  Average days lost
per FTE for same period last year was 2.68

Page 15

Appendix 3
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 845              791               (54)                  (6%) 1
Neighbourhood Services
Roads 7,220           7,220            -                      0%
Streetscene 5,317           5,317            -                      0%
Waste Resources 8,345           8,345            -                      0% 2         
Municipalisation Advertising (73)               (73)                -                      0%
Total for Neighbourhood Services 20,809         20,809          -                      0%
Economic Development, Growth and
Investment
Economic Policy 324              289               (35)                  (11%)
Employability & Skills 1,764           1,764            -                      0%
Regeneration 682              682               -                      0%
Business 577              577               -                      0%
Growth & Investment 245              245               -                      0%
Total for Economic Development, Growth and
Investment 3,592           3,557            (35)                  (1%)
Sustainability, Transport and Corporate
Property
Property Management & Investment 1,690           1,649            (41)                  (2%) 3         
Housing Assets & Investment 117              117               -                      0%
Property Maintenance 4,588           4,588            -                      0%
Property Running Costs 5,454           5,580            126                 2% 4         
Energy and Sustainability 6,863           6,872            9                     0%
Internal Transport 11,152         11,294          142                 1% 5         
Total for Sustainability, Transport and Corporate
Property 29,864         30,100          236                 1%
Net Total 55,110         55,257          147                 0%

Page 16

Appendix 3
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 28,746         29,182          436                 2%
Property Costs 23,023         23,172          149                 1%
Supplies and Services 4,276           4,266            (10)                  (0%)
Transport and Plant Costs 9,826           10,272          446                 5%
Administration Costs 581              573               (8)                    (1%)
Other Agencies & Bodies 15,475         15,291          (184)                (1%)
Transfer Payments -                   -                    -                      0%
Other Expenditure 78                68                 (10)                  (13%)
Capital Financing -                   -                    -                     
Gross Expenditure 82,005         82,824          819                 1%
Income (26,895)        (27,567)         (672)                2%
Net Expenditure 55,110         55,257          147                 0%

Page 17

Appendix 3a
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Directorate and Support
Movement: There has been a favourable movement of (£0.022m) since P3 due to a forecasted underspend in
employee costs.
833 (54) (6%) Employee Costs: There is a projected underspend due to vacancy management.
(54)
Note 2 Waste Services
Movement: There has been no overall movement since P3.
5,382 628 12%
Employee costs: Current sickness absence rates for April to August 2025 are 8.43 days per employee, if
projected at these levels to March 2026 this would result in a forecasted annual rate of 20.24 days. A robust
absence monitoring process is in place and a dedicated resource has been recruited to monitor and review the
absence management process in Waste, through assisting supervisors with absence management meetings,
referrals to occupational health etc and to support employees return to work. The statutory nature of the
service requires additional resources and/or overtime to cover unforeseen absences resulting in additional
costs. To help mitigate against this, resources out-with Waste Collections have received HGV training to help
provide cover for collections.  An overall review of the Waste service in light of legislative changes and current
service demands is ongoing. The absence rates reflect an improving position, however they are still above
target rates.
240 244 102% Transport Costs: Additional vehicles are currently in place to deal with ongoing pressures and demands. 
Transport needs are continuously under review and flexed depending on the operational needs of the service.
655 (35) (5%) Supplies & Services: Forecasted underspends in materials of £0.020m and refuse containers £0.015m.
6,726 (185) (3%)
Third Party Payments: Projected underspends mainly from diverted waste of £0.244m due to anticipated
reduction in tonnages as a result of the implementation of the HWRC booking system, the organics contract of
£0.039m, and the recyclables contract of £0.029m, this is partially offset by forecasted overspends in Special
Uplift processing costs of £0.073m due to increased costs for POPs waste and £0.039m in the Clyde Valley
residual waste processing contract.
(4,820) (631) 13%
Income:  Income from the Extended Producer Responsibility for packaging funds is anticipated to exceed the
amount currently included in the Budget. These funds are due to be received in 3 tranches from November
2025 and will be allocated to cover chargeable disposal costs. In 2025/26 these funds will help address the
pressures faced by the service and support further investment to meet operational needs and deliver service
improvements. Further details around levels of anticipated income and investments will be provided during the
year. This income is partially offset by a projected under-recovery in purple bin contract income of £0.127m
due to reductions in recyclate market prices, the re-tendering of this contract is currently being considered.
(21) Other minor movements
0
Note 3 Property Management and Investment
Movement: There has been favourable movement of (£0.080m) since P3 mainly driven by a reduction in
employee costs £0.091m due to vacancy management.
2,628 (94) (4%) Employee Costs: Underspend of £0.094m primarily due to vacancy management.
(1,263) 40 (3%) Income: Under-recovery of fee income of £0.040m.
13 Other minor movements
(41)
Note 4 Property Running Costs
Movement: There has been an adverse movement of £0.126m since P3 as a result of increased Non Domestic
Rates Costs.
7,321 126 2% Property Costs: Overspend of £0.126m due to Non Domestic Rates costs in relation to Moorpark Primary and
Annickbank Innovation Campus.
126

Page 18

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 5 Internal Transport
Movement: There has been a favourable movement of (£0.053m) since P3, this is mainly due to a projected
underspend in fuel of £0.068m offset with other minor variances.
1,774 16 1%
Employee Costs: There is a projected overspend of £0.016m due to turnover target not being fully achieved
and additional overtime costs.  This has been partially offset by underspends due to Mechanic vacancies.  An
employee workforce planning exercise is to be carried out.
1,898 (68) (4%)
Fuel: There is a projected underspend in fuel of £0.098m due to lower usage as more electric vehicles are
introduced to the fleet, this is offset with a projected overspend of £0.030m in Other Fuel related costs due to
Maintenance for EV Workplace Chargers.
1,305 225 17%
Repairs & Maintenance: There is a projected overspend of £0.225m due to repairs being outsourced as a
result of difficulties recruiting Motor Mechanics, as well as price increases and maximising the life of assets
due to suitable replacement vehicle lead times.
(3,161) (81) 3%
Income: There is a projected over-recovery of £0.050m in bus transport income and a projected over-recovery
of £0.050m in hire of pool vehicle income which will support overspends in repairs and maintenance as end of
life vehicles in pool are being retained for longer, offset with a projected under recovery in Enterprise Cars
Income.
50 Other minor movements
142

Page 19

Appendix 4
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Directorate and Support 152              152               -                      0%
Housing and Public Protection
Building Services (2,550)          (2,550)           -                      0% 1         
Planning Services 225              169               (56)                  (25%) 2         
Protective Services 1,941           1,941            -                      0%
Other Housing 2,863           2,846            (17)                  (1%)
Total for Housing and Public Protection 2,479           2,406            (73)                  (3%)
Connected Communities 12,158         12,447          289                 2% 3         
Net Total 14,789         15,005          216                 1%
Subjective Summary
Annual
Budget
Projected
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 25,669         25,782          113                 0%
Property Costs 3,123           3,280            157                 5%
Supplies and Services 6,923           6,922            (1)                    (0%)
Transport and Plant Costs 979              976               (3)                    (0%)
Administration Costs 310              310               -                      0%
Other Agencies & Bodies 11,433         11,433          -                      0%
Transfer Payments -                   -                    -                      0%
Other Expenditure 286              286               -                      0%
Capital Financing -                   -                    -                     
Gross Expenditure 48,723         48,989          266                 1%
Income (33,934)        (33,984)         (50)                  0%
Net Expenditure 14,789         15,005          216                 1%

Page 20

Appendix 4a
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been no movement since Period 3.
10,792 363 3% Employees: a projected overspend in employee costs of £0.363m. This is primarily due to a regrading of
operative posts and an increase in the pay uplift.
4,584 45 1% Supplies & Services: a projected overspend in materials of £0.045m. This is due to changes in the income
profile detailed below.
3,287 139 4%
Third party payments: a projected overspend in third party payments of £0.139m. This is due to an overspend
in payment to contractors as a result of a carry forward of storm damage works from the previous financial
year.
(23,265) (546) 2%
Income: a projected over recovery in income of £0.546m. This is primarily due to an increase in Responsive
Repairs income of £0.659m as a result of an increase in storm damage works carried forward from last
financial year partially offset by a reduction in other responsive repairs and a 5% productivity efficiency. There
is also an increase of £0.637m in Planned repairs due to increased timber and damp works. This is partially
offset by a reduction of £0.503m in voids works and £0.249m in Projects, mainly due to reduction in demand
for replacement bathrooms and wetrooms at void stage.
(1) Other minor movements
-
Note 2 Planning Services
Movement: There has been a favourable movement of (£0.056m) since Period 3, this is mainly due to
forecasted over recovery for additional planning fee applications.
(684) (50) 7% Income: This is primarily due to the forecasted over recovery of £0.050m for additional planning fee application
income.
(6) Other minor movements
(56)
Note 3 Connected Communities
Movement: There has been no significant movement since Period 3.
1,631 133 8%
Employee Costs: a projected overspend of £0.133m is a result of revised programming of implementation of
the approved saving for the libraries 20% reduction efficiencies target with work ongoing as part of the Land
and Property review.
104 156 150% Property Costs: a projected overspend of £0.156m due to storm damage repairs at Eglinton Country Park.
289

Page 21

Appendix 5
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,262 2,254 (8)                 (0%)
SPT Concessionary Fares 291 291 -                   0%
Ayrshire Joint Valuation Board 1,002 1,002 -                   0%
3,555 3,547 (8)                 (0%)
Other Corporate Costs
Pension Costs 1,895 1,895 -                   0%
Central Telephones 350 350 -                   0%
Other Corporate Items (incl Transformation
Costs, Bad Debt Provision, External Audit fees
and other centrally held funding.)
17,747 17,040 (707)             (4%) 1           
Insurance Account 541 541 -                   0%
Housing Benefits 2,870 2,951 81                3% 2           
26,958 26,324 (634)             (2%)

Page 22

Appendix 5a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Other Corporate Items
There has been an adverse movement of £0.166m since P3 primarily related to updated contingencies and
inflationary provisions
17,747 (707)                -4%
The projected underspend is primarily related to centrally held inflationary cost provisions, which are being
applied to offset pressures reported across other services (£0.235m), additional income from employee benefit
schemes (£0.278m)and additional income to support the administration of Housing Benefit and Discretionary
Housing Payments (£0.194m).
(707)
Note 2 Housing Benefit
There have been no signficiant movements since P3
2,870         81                   3% Projected overspend of £0.081m due to Housing Benefit Overpayment Recovery Projections
81

Page 23

Appendix 6
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 13,854 13,854 - -
Contribution to Loans Fund Reserve 9,660 9,660 - -
Scottish Government Funding (390,337) (390,337) - -
Council Tax (72,009) (72,425) (416) 1% 1
Use of Earmarked Funds (4,465) (4,465) - -
Net Total (443,297) (443,713) (416) 0%
The projected over recovery reflects growth in the Council Tax base from additional new builds and properties
previously registered as self catering holiday units for NDR purposes. The introduction of the Second Homes levy
has resulted in the reinstatement of 115 properties as primary residences. The impact of this policy will continue to
be monitored throughout the remainder of the year.
Note 1 Council Tax
There has been no material movement since P3.

Page 24

Appendix 7
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£  £  £
Employee Costs 5,222 5,222 - 0%
Property Costs
Responsive Repairs 7,406 7,243 (163) (2%)
Void Repairs 4,656 4,124 (532) (11%)
Planned and Cyclical Maintenance 6,047 6,832 785 13%
Aids and Adaptions 1,792 1,792 - 0%
Other property costs 5,726 5,955 229 4%
Total for Property Costs 25,627 25,946 319 1% 1
Supplies & Services 2,145 2,167 22 1%
Transport Costs 16 16 - 0%
Administration Costs 2,114 2,118 4 0%
Third Party Payments 3,832 3,832 - 0%
Transfer Payments 177 177 - 0%
Other Expenditure 550 550 - 0%
Capital Financing Costs 25,549 23,348 (2,201) (9%) 2
Gross Expenditure 65,232 63,376 (1,856) (3%)
Income
Council House Rents (62,568) (62,568) - 0%
Other Rents (541) (541) - 0%
Recharges (1,212) (1,320) (108) 9% 3        
Other Income (911) (913) (2) 0%
Total Income (65,232) (65,342) (110) 0%
Net Expenditure - (1,966) (1,966)

Page 25

Appendix 7a
HRA
BUDGETARY CONTROL 2025/26
REPORT FOR THE 5 MONTHS TO 31 AUGUST 2025
Budget
£000
Variance
£000
Variance
as % of
budget
Note 1
25,627 319 1%
319
Note 2
25,549 (2,201) -9%
(2,201)
Note 3
(65,232) (110) 0%
(110)
B/fwd from
2024/25
Transfer to /
from Reserves
Use of
Earmarked sums
Earmarking of in
year surplus
Funding of
Capital Projects
Projected
Balance at
31/03/26
£m £m £m £m £m £m
13.213 - - (0.235) - 12.978
- - - 2.201 - 2.201
5.000 - - - - 5.000
2.000 - - - - 2.000
1.758 - - - - 1.758
0.170 - - - - 0.170
22.141 - - 1.966 - 24.107
HRA reserves and balances
Capital Financing Costs
Movement: There has been a favourable movement of £0.720m since P3 reflecting changes to the phasing of
borrowing to support the capital programme.
A projected underspend of £2.201m in capital financing costs reflects continuing strategy to delay new external
borrowing by utilising cash balances, resulting in savings on external interest costs, changes in the profile of the
capital programme and projected investment income returns.
Movement: A favourable movement of £0.110m since Period 3 related to additional insurance recoveries.
A projected over recovery in income of £0.110m due to insurance recoveries.
Income
Section
Property Costs
Movement: there has been an adverse movement of £0.372m since P3. This is due to adverse movements of
£0.213m in Responsive Repairs, £0.446m in Planned and Cyclical Maintenance and £0.236m in other property
costs partially offset by a favourable movement of £0.523m in Void Repairs.
A projected overspend of £0.319m in Property costs. This is primarily due to a projected overspend of £0.785m in
Planned and Cyclical Maintenance as a result of an overspend of £0.325m in storm damage works carried over
from last financial year as result of adverse weather conditions early in 2025 and £0.448m in Timber and damp
works. There is also an overspend of £0.229m in other property costs, mainly due to increased expenditure in
relation to the maintenance of trees. This is partially offset by an underspend of £0.163m in Responsive Repairs
and £0.532 in Void Repairs.
Council House Building Fund
Sustainability Fund
Transformation Programme
Tenant led budget
Unearmarked
HRA Loans Fund

Page 26

Appendix 8
Place
Roads - Employee Costs P 0.025
Roads - Supplies and Services P 0.092
Roads - Administration Costs P 0.004
Roads - Income P -0.121
0.000
0.000
Budget Management - 31 August 2025
Virement/Budget Adjustment Requests
2025/26
Perm (P) /
Temp(T)
Virement £m Directorate
Total
£m

Page 27

Appendix 9
Integration Joint Board
25th September 2025
Subject: 2025-26 – Month 4 Financial Performance 
Purpose: To provide an overview of the IJB’s financial performance as at
Month 4 (July). 
Recommendation: It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for the
financial year 2025-26 and the current overall projected year-end
overspend of £5.259m reducing to £1.733m after planned recovery
actions;
(b) notes the progress with delivery of agreed savings;
(c) approves the actions which are being taken to progress financial
recovery and that an updated recovery plan will be presented to the
next IJB; 
(d) note the projected overspend position of £0.134m for services
managed under Lead Partnership arrangements by South Ayrshire
HSCP and request that a financial recovery plan is proposed to bring
the budget back online for 2025/26;
(e) note that services managed in East Ayrshire under Lead
Partnership arrangements are projected to overspend by £0.430m and
that a financial recovery plan will be presented to the IJB on 29 October
2025 for formal approval; and
(f) notes the remaining financial risks for 2025-26; 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team

Page 28

1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of July further work is undertaken following the month
end to finalise projections, therefore the projected outturn position is as current and
up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £5.259m (1.5%) reduced to
£1.733m through already identified financial recovery actions. There is an increasing
risk to achieving financial balance during 2025-26, the projected outturn position is
summarised below with the residual risk following already identified financial
improvement actions: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth4 5.259 2.051 3.208
Financial Recovery Plan Projections (3.526) (1.275) (2.251)
Residual Risk 1.733 0.776 0.957 
The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds. 
The projection assumes all mitigations and controls established in 2024-25 continue
throughout 2025-26 as it is recognised that the same uncertainty and risks remain
into 2025-26 and there needs to be tight grip and control over expenditure overall. 
1.3  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical disability care packages, supplementary
staff in wards, staff costs in Montrose House and Unplanned Activities (UnPACs)
within the lead partnership for mental health. 
1.4 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budget, on that basis further information will be brought forward with
further detail on Lead Partnership services. 
1.5 Since the setting of the budget in March 2025 the 2025/26 financial position has been
adversely impacted by the below factors out-with the control of the IJB.

Page 29

• National Care Home Contract (NCHC) – the recent increase to the NCHC rate
to reflect the impact of the nursing pay award resulted in an additional
unfunded cost of £0.175m.
• NHS Board allocation for the Employers National Insurance increase
confirmed at 60% of funding – full year impact £0.664m 
• The current allocation for the Agenda for Change costs in relation to the
reduced working week are currently being queried with the NHS finance team
to ensure we receive our ‘fair share’ of the funding.  The current funding
allocated is £0.659m, the cost of covering all reduced hours is £1.497m,
currently calculating actual cover costs and will request NHS AA review
funding allocation.  This request will be informed by information collated from
services on the actual impact and cost.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery. 
2.2 FINANCIAL PERFORMANCE – AT MONTH 4 
At month 4 against the full-year budget of £341.975m there is a projected year-end
overspend of £5.259m (1.5%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £3.208m in social care services and a projected
overspend of £2.051m in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and the capacity of providers to take on work. 
Appendix F provides information on the costs of bank and agency staff. 
2.3 Health and Community Care Services 
Against the full-year budget of £98.615m there is a projected overspend of £4.330m
(4.4%) which is an adverse movement of £0.206m and the main variances are: 
a) Care home placements – net projected overspend of £0.575m. This includes an
overspend on placements of £1.275m which includes a provision for an average

Page 30

of 7 interim beds and reflects the recent increase to the NCHC to reflect the impact
of the nursing pay award resulted in an additional unfunded cost of £0.175m.   The
adverse movement is mainly due to £0.508m of PD care home placements
transferring to this budget which was approved as part of the recovery plan. 
The budgeted number of permanent placements was 765 and at month 4 there
were 792 placements for older people and 14 PD placements resulting in a
projected overspend of £1.275m. 
The plan to manage down the number of permanent placements to reach the
target is challenging due to the need to respond to referrals from hospital and to
continue to support those in critical and substantial need in the community. 
The overspend is partially offset by income recovered from charging orders which
is projected to be £0.700m over recovered. This income is challenging to predict
as it depends on the length of the legal process and time taken to sell the property
that the charging order is registered to. 
b) Care at home is projected to be £1.672m overspent (£0.031m adverse). The
position reflects the cost of meeting the significant demand and level of provision
for care at home support.   
c) Physical Disability Services – projected overspend of £0.429m (£0.494m
favourable) split as follows: £0.845m over in residential placements, £0.240m
under in direct payments and £0.176m under in community care packages.  The
favourable movement is due to the transfer of £0.508m of PD cases to the older
people care home placement budget. 
d) Integrated Island Services is projected to overspend by £0.311m (£0.045m
adverse).  The most significant variance is a projected overspend at Montrose
House of £0.133m (£0.056m favourable) which relates to the net overspend on
agency staff (i.e. net of underspend on employee costs) and overspends across
property, continence and medical supplies, admin and transport.   The Arran
Patient Transfer contract is projected to overspend by £0.040m. 
e) Specialist Rehab wards – projected overspend of £0.190m (£0.024m favourable)
(Redburn ward £0.234m overspend and Douglas Grant £0.044m underspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.783m (£0.044m favourable). The
overspend is due to increased use of supplementary staffing.   All rehabilitation
wards are operating at 100% occupancy supporting a high level of patient
needs/complexity, which places pressure on staffing levels and the use of bank
and agency staff to support additional patient observations.   The senior manager
has developed an action plan which will reduce this overspend and the reduction
is reflected in the recovery plan. 
g) District Nursing – projected to overspend by £0.093m (£0.007m favourable)
mainly due to an overspend on continence supplies.

Page 31

2.4 Mental Health Services 
Against the full-year budget of £120.719m there is a projected overspend of £0.605m
(0.5%) which is a favourable movement of £0.335m prior to the re-allocation of the
Lead Partnership variance to East and South HSCP.   
The main variances are:
• Learning Disabilities are projected to overspend by £0.620m (£1.044m
adverse).  It should be noted that most of the adverse movement is due to the
all-age disability budgets being transferred from children’s services to
Learning Disabilities and this resulted in an adverse movement of £1.094m.
This £1.094m is across residential placements (£1.481m over), direct
payments (£0.317m under) and community packages (£0.178m under).   The
main historic LD budget is projected to underspend by £0.385m across
community care packages (£0.699m under), direct payments (£0.231m over)
and residential placements (£0.034m over).  This improvement from 2024-25
reflects the positive impact of assertive reviews of care packages and
increased clawbacks from direct payments. 
• Community Mental Health services are projected to underspend by £0.154m
(£0.059m favourable movement) across community care packages (£0.538m
under), direct payments (£0.167m over), residential placements (£0.347m
over) and Nethermains (£0.103m under). The main reason for underspend in
community packages is the availability and capacity of adult community
providers to deliver new packages of care. 
• There is a projected underspend of £0.353m in relation to the cost of Hospital
Based Complex Continuing Care (HBCCC), this reflects the impact of change
in provision for these services.  There were plans to reinvest this in the service,
but these plans are on hold as holding the funding was agreed as part of the
recovery plan at month 3.
• The Lead Partnership for Mental Health is projected to be £0.486m overspent
(£1.321m favourable) and the main variances are as follows: 
• Adult Inpatients – projected overspend by £0.639m (£0.267m adverse)
due to very high levels of continuous intervention which require
additional supplementary staff and enhanced observations (1:1 and
2:1) and use of bank staff. There is an overspend of £0.288m at month
4 but this is partially offset by a recharge to another HSCP on a cost
basis for an outwith authority placements which has incurred additional
costs in relation to usage of supplementary staffing due to sustained
enhanced observations. 
• The UNPACS (Unplanned Activities) budget – projected overspend of
£1.353m (£0.016m favourable) based on current placements. UnPACS

Page 32

placements are for individuals with very specific needs that require a
higher level of security and/or care from a staff group with a particular
skill set/competence.  There are no local NHS secure facilities for
women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs
placement with a specialist provider which can be out-of-area.  The
nature of mental health UNPACs spend is that it is almost exclusively
on medium- or long-term complex secure residential placements which
are very expensive so a small change in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications
to approve a placement are made to the Associate Medical Director for
Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed. Part of the
additional control measures agreed in month 3 was to expand the high-
cost care package review group to include all UNPACS placement
requests. 
• Learning Disability Services – projected to overspend by £0.056m
(£0.045m favourable).  This relates to the potential delays in achieving
the saving from Trindlemoss moving from a nursing to social care
model.  The progress with this was impacted by the requirement to
close Ward 7A in July 2025.   It is assumed that Ward 7A budget will
be online as the use of bank staff will reduce. 
• Elderly Inpatients – projected overspend of £0.133m (£0.131m
favourable) due to the use of supplementary staffing.  The elderly
mental health wards continue to operate at full occupancy and at times
with waiting lists, with several patients who are on enhanced
observations and bank costs remain high. 
• Eating Disorders – projected to overspend by £0.127m (£0.002m
favourable movement) due to the staffing level being higher than the
funding allocation.  This is being considered alongside the overall
resource allocation. 
• Enhanced Mental Health Outcome Framework (EMHOF) – projected
underspend of £0.624m.  There was £0.624m of reserves held for
EMHOF and the recovery plan approved the draw down of these
reserves which is the reason for the favourable movement.   
• Psychiatry – is projected to overspend by £0.292m (£0.023m adverse)
mainly due to junior doctor costs. A mitigation plan is being developed
and the rota for junior doctors is being reviewed. 
• MH Pharmacy – is projected to overspend by £0.036m (£0.360m
favourable),  This favourable movement is mainly due to a prior year
rebate.  Prior to this rebate there was an overspend due to increased
demand and cost of medicines, and particularly the cost of Buvidal.

Page 33

This position is after investing £0.510m on a Pan Ayrshire basis
(£0.170m per HSCP). 
• Action 15 – is projected to underspend of £0.229m (£0.497m
favourable). There was £0.487m of reserves held for Action 15 and the
recovery plan approved the draw down of these reserves which is the
reason for the favourable movement.  The projected underspend is
after considering the legacy costs from the 2024/25 review of funding.   
▪ Innovation Fund – projected underspend of £0.025m (no movement)
assuming that the posts to be redeployed as part of the EMHOF review
are actioned. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £0.701m
(adverse movement of £0.173m) in 2025-26.  Further information is
included in the table below: 
Vacancy Savings Target (£1.160m)
Projected to March 2026 £1.688m
Over/(Under) Achievement £0.528m
2.5 Children and Justice Services 
Against the full-year budget of £41.619m there is a projected overspend of £1.606m
(3.9%) which is a favourable movement of £0.924m and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£1.915m (£0.942m favourable).  This favourable movement is primarily due to the
children with disabilities budget moving to Learning Disabilities. Some of these
costs are offset by the contribution from the Home Office for Unaccompanied
Asylum-Seeking Children which is detailed below. 
The main areas within this are noted below: 
• The children’s residential placements are projected to overspend by £2.691m
(£0.037m favourable) based 34 placements in month 4. This demonstrates an
increase of 5 places since the start of the financial year. There are several
factors leading to this challenging position: 
o We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy or over for some
time, leading to increased use of external placements where residential
care is required.
o There remains an acute shortage of foster carers leading to residential
care being necessary in emergency placement situations.

Page 34

o The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support trafficked
young people who have been identified in North Ayrshire.
o A number of young people in residential care have requested Continuing
Care, whereby a young person can remain in their placement until age
21.
o Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases is
shared 50/50 with Education services. 
o Contractual inflation has still to be agreed for most placements and it is
likely that this will increase the projected costs of residential places which
is outwith the control of the service.
o Children’s Services are continuing to work with other services including
Education and Housing to address the challenges through the work of the
‘Brighter Pathways’ Programme Board and associated workstreams. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.905m (£0.014m adverse) underspent. 
• Residential respite – placements are overspent by £0.073m (no movement).
These short-term placements are used to prevent an admission to full time
care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.071m (£0.079m
favourable movement), largely due to staffing levels in the children’s houses
and regrading of posts. 
• Care Leavers – projected underspend of £0.071m (no movement) in rent
costs. 
• Section 29 Payments (Throughcare Team) are projected to overspend by
£0.064m (no movement). 
b) Head of Service – is projected to underspend by £0.568m (£0.020m favourable).
This consists of a projected overspend of £0.166m  (£0.030m favourable) to the
previous saving in relation to the staff reconfiguration in the children’s houses
which was not achieved in 23-24 or 24-25 and this is offset by the grant funding
in relation to Unaccompanied Asylum-Seeking Children (UASC), which is
projected to amount to £0.764m (£0.028m adverse) and which contributes to
costs incurred across a number of C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.144m (£0.023m adverse)
mainly in relation to the Band 6 to 7 regrade for Health Visitors and the
progression of posts up the Band 7 scale.  Part of this recurring cost was
incorporated into budget pressures for 2025/26. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP)

Page 35

The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to underspend by £0.204m (£0.001m favourable). One contract has
ceased at the end of June and there are savings against other areas.  There is also
an over-recovery of income in Learning and Development for social work student
placements. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.026m
(£0.089m adverse) and the main areas of variance are: 
• There is projected slippage on the LD and MH transition funding of £0.263m
(£0.017m favourable) due to delays in children transitioning into adult
services. This involves complex planning by services with service users and
families and can change over time based on assessed need when moving into
adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   
• There is also a balance of overachieved savings of £0.061m (no movement)
as a result of the 25/26 budget decision. 
• NHS shortfall in savings of £0.406m which is not coded to specific areas and
held centrally until recurring savings can be identified.
• An over-recovery of payroll turnover of £1.100m (£0.100m adverse) for social
care services and an over-recovery of £0.302m (£0.101m adverse) for health
services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (£3.400m) (£1.567m)
Projected to be achieved by March
2026
£4.500m £1.869m
Over/(Under) Achievement £1.100m £0.302m  
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.  
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. 
For 2025/26 there will be a further recruitment delay with vacancy scrutiny approved
vacancies being held for four weeks before they are advertised to create more payroll

Page 36

turnover.  This will be for all vacancies except clinical or registered services
vacancies or those which will incur cover costs. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2025-26 budget included £4.019m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 4
£m
Red - 1.000
Amber 2.984  1.041
Green 1.035 0.686
Blue - 1.292
TOTAL 4.019 4.019 
b) The main area to note is that the red savings have increased since month 3
as the saving in relation to the Brighter Pathways is not as certain.   
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount (£000)
1 Virement to Medical Directorate from Mental Health
Admin (0.028)
2 Primary Care Prescribing Tariff Reduction  (0.556) 
2.11  Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis.

Page 37

The outturn in relation to North Lead Partnership services is not fully attributed to the
North IJB as a share is allocated to East and South Partnerships; similarly, the impact
of the outturn on East and South led services is shared with North. At Month 4 the
MH lead partnership is projected to overspend by £0.485m (£0.159m NRAC share
for East and £0.139m for South). 
South HSCP (month 3 info) – projected overspend of £0.134m of which £0.050m
(no change) will be allocated to North. The variance is mainly due to an overspend
of £0.080m in the community store.  This includes the costs of replacing mattresses,
repairs and maintenance contract and equipment costs. There is also a projected
overspend of £0.058m in the Family Nurse Partnership as the SG funding was based
on the mid-point of the salary scale and all post are now at the top point of the scale. 
This will be a pressure in 2026/27. 
East HSCP (month 4 info) - projected overspend of £0.430m (of which £0.159m will
be allocated to North - £0.119m adverse movement). The main variances are: 
• The Primary Care and Out of Hours Services budget £134.522m budget is
projected to overspend by £0.622m. 
There are projected additional costs within Primary Care Contracting and
Support £0.493m, due to a number of variances, including new Office 365
licence costs, additional spend related to the GP’s Sub-Committee and
staffing costs. Primary Medical Services are projected to overspend by
£0.688m, due to additional staffing costs, including increased pension and
sickness cover costs. These projected additional costs are being partially
offset by a projected underspend £0.170m against Ayrshire Urgent Care
Services based on Summer/Winter module. Funding has been allocated to
fully offset Urgent Care Pathway costs £0.823m, as well as Covid-19
Therapeutics of £0.274m, with costs projected at £0.233m. 
There is a £0.304m underspend in Dental services that reflects that staffing
numbers are running at less than establishment. 
• Prison and Police Healthcare (Lead Partnership)
The £0.106m projected overspend at month 4 is largely due to increase
prescribing costs and is partially offset by reduced staffing costs. Prison
prescribing was highlighted as a budget pressure as part of the 2025/26
budget. Both East and South Ayrshire IJBs have approved additional funding
to offset this pressure however North Ayrshire IJB did not provide for this in
their approved budget. The additional funding has not been allocated against
the prescribing budget at this stage, with further pan-Ayrshire discussions to
be undertaken to determine how to account for this in the current financial year
and going forward. It is anticipated that the Prison and Police Healthcare
projected overspend highlighted in this report will reduce as a consequence
of this work. 
• Allied Health Professions (Lead Partnership)
There is a projected underspend of £0.445m on AHPs services hosted by East
Ayrshire for the current year, which mainly relates to staffing savings.

Page 38

• Other Services (Lead Partnership)
The £0.146m projected overspend is due to increased Area Wide Evening
Services costs, mainly due to additional staffing costs including high use of
bank staff, which will require to be addressed going forward. 
• An initial financial recovery plan for East Hosted Services will be developed
and progressed and will be brought to the IJB on 29 October 2025 for formal
approval. This financial recovery plan will also require to be approved by North
and South Ayrshire IJBs. 
Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.  
1.          Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other,
however the aggregate will remain unchanged. The table below shows the cost of
the historic baseline at 2024/25 prices. The 2025/26 actual usage information is not
known until later in the year.   
IJB
Baseline at
2024/25
prices     
(£)
East 31.870
North 39.966
South 34.488
Total 106.324  
The annual budget for Acute Services is £488.0million.  The directorate is overspent
by £10.5 million after 4 months including legacy CRES.  
This was caused by overspends on medical and nursing staff, together non pay
overspends on equipment and supplies. These are required due to the level of
operational pressure experienced. Unfunded beds contributed an overspend
of £2.2m after 4 months. 
Within the overall £10.5m overspend Medicine are over by £4.5m, Emergency Care
by £3.6m, Surgery by £1.0m, Labs and Diagnostics by £1.2m and Women and
Children by £0.9m. Legacy CRES and underspends on other budgets make up the
difference.

Page 39

There is a material underlying deficit caused by:  
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and
Arran acute hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients.
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
In respect of Lead Partnership Services, the 3 Chief Officers and CFOs have met to
consider improvements in the reporting and visibility of financial and operational
performance for those services which we lead or are led by another HSCP.  Actions
have been agreed to develop more regular shared information to be shared across
all 3 IJBs with an intention to incorporate this further detail into future financial
monitoring reports during 2025/26.   
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position. 
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing
across community, mental health and learning disability wards.
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to
reduce the Board’s deficit may have impacts on other parts of the health and
care system. 
• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board
approved financial plan.

Page 40

• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a
heightened risk of provider failure leading to handing back of care and
contracts.
• The ongoing ability to source packages of care for service users.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a
number of service areas and the use of high-cost agency staff to support
frontline service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
• Scot Excel inflationary increases for children’s services have been
significantly higher than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be monitored during 2025/26. 
2.13 RESERVES 
The IJB opening reserves position, subject to completion of the 24/25 audit, is
summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2025 -  2.381 0.780 3.161
Anticipated Drawdown -  (2.381) (0.780) (3.161)
Balance – 31 March 2026 -  - - - 
The £0.780m HSCP earmarked reserve relates to the Service Redesign and Change
Fund which is fully committed in 2025/26. 
Further detail on the reserves is given in Appendix D. 
2.14 Financial Recovery Plan 
The IJB set a balanced budget for 2025/26 on 20th March 2025. This did not include
any draw on reserves but did include the approval of £4.019m of savings to achieve
financial balance. Services will continue to work towards implementing the recovery
plan to deliver cost reduction targets while carefully managing the level of risk. This
will include the preparation of equality impact assessments.

Page 41

The management actions and governance framework outlined below which were
agreed in 2024/25 will continue throughout 2025/26: 
MANAGEMENT ACTIONS/CONTROLS AGREED IN 2024/25 
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Restrictions on all but essential overtime working.
• Ongoing review of future year savings or transformation programmes to
identify scope for acceleration.
• Maximise opportunities from the recently reopened Independent Living Fund
(ILF) Scotland. 
GOVERNANCE MEASURES AGREED IN 2024/25 
• Establishment a ‘Finance Working Group’, chaired by the IJB Chair or Vice
Chair. The Director and Heads of Service are members of the group. It meets
monthly to facilitate increased oversight and scrutiny of the financial position
and transformation programme as well as detailed budget planning for future
financial years. 
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams, including
line by line reviews of all budget areas.   
MANAGEMENT ACTIONS/CONTROLS AGREED IN 2025/26 (AUGUST 2025) 
• Recruitment delay – there will be a recruitment drag with vacancy scrutiny
approved vacancies being held for four weeks before they are advertised to
create more payroll turnover.  This will be for all vacancies except clinical or
registered services vacancies or those which will incur cover costs.
• High-cost care package group – the remit of this group will be expanded to
include care packages for children with a disability and all UNPACs placement
requests.
• Oversight group for looked after and accommodated children in residential
care – this group meets fortnightly to actively review all placements. 
NEW ACTIONS: 
• The senior managers for the main areas of overspend have been tasked with
preparing an SBAR reports to be considered at the PSMT.  This will cover

Page 42

current action being taken to reduce the overspend and future planned action. 
This will inform the update to the month 6 recovery plan.  These actions will
be tracked each reporting period and if progress is not being made an update
will be made to the finance working group and IJB.
• The Director and Chief Finance Officer have started a rolling programme of
one-to-one meetings with individual budget holders across the HSCP to
consider opportunities for cost reduction, service change and any spend to
save propositions – to support the development of the 2026/27 budget but
also to identify further cost reductions for the current financial year. 
RECOVERY ACTIONS – MONTH 4 UPDATE 
• The updated recovery action is outlined in Appendix E.  This includes the
proposals agreed at month 3 and updated progress at month 4 and any
changes to target reductions.  The actions are a mix of cost reduction targets
across various services and a drawdown of reserves. At month 3 the position
was: 
TOTAL Health/
NHS AA
Social
Care/NAC
Projected Overspend @ mth3 5.187 2.271 2.916
Financial Recovery Plan Projections (4.012) (1.752) (2.260)
Residual Risk 1.175 0.519 0.656 
• At month 4 this has deteriorated to: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth4 5.259 2.051 3.208
Financial Recovery Plan Projections (3.526) (1.275) (2.251)
Residual Risk 1.733 0.776 0.957 
• This plan will be reviewed each month and further recovery actions will be
presented to the IJB for approval. 
PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2025-26 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact

Page 43

Ongoing updates to the financial position will be reported to the IJB throughout 2025-
26. 
4. IMPLICATIONS  
4.1 Financial
The outturn is an overall year-end overspend of £5.259m (1.5%) prior to recovery
action. The report outlines the main variances for individual services.  The IJB
unearmarked reserve balance is zero. This current position poses a financial risk to
North Ayrshire Council and NHS Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP.
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money.
The ‘financial viability of the HSCP’ risk on our strategic risk register. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2025-26 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2025-26. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION 
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team.
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director

Page 44

Author – Eleanor Currie, Chief Finance Officer 
[eleanorcurrie@north-ayrshire.gov.uk]

Page 45

PUBLIC INFORMATION
2025-26 Budget Monitoring Report–Objective Summary as at 31st July 2025                                                                 Appendix A   
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 77,507 80,514 3,007 21,108 22,431 1,323 98,615 102,945 4,330 4,124 206
: Locality Services 32,828 33,942 1,114 5,914 6,006 92 38,742 39,948 1,206 1,137 69
: Community Care Service Delivery 40,500 42,245 1,745 0 40,500 42,245 1,745 1,624 121
: Rehabilitation and Reablement 2,108 2,118 10 0 2,108 2,118 10 (21) 31
: Long Term Conditions 868 915 47 10,661 11,677 1,016 11,529 12,592 1,063 1,123 (60)
: Community Link Workers 384 379 (5) 0 0 0 384 379 (5) (5) 0
: Integrated Island Services 819 915 96 4,533 4,748 215 5,352 5,663 311 266 45
MENTAL HEALTH SERVICES 40,722 41,195 473 79,392 79,524 132 120,114 120,719 605 940 (335)
: Learning Disabilities 31,712 32,332 620 747 747 0 32,459 33,079 620 (424) 1,044
: Community Mental Health 7,015 6,861 (154) 1,831 1,831 0 8,846 8,692 (154) (95) (59)
: Addictions 1,995 2,002 7 1,899 1,899 0 3,894 3,901 7 6 1
: HBCCC 0 0 0 353 0 (353) 353 0 (353) (353) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 74,562 75,047 485 74,562 75,047 485 1,806 (1,321)
CHILDREN & JUSTICE SERVICES 35,862 37,307 1,445 5,757 5,918 161 41,619 43,225 1,606 2,530 (924)
: Irvine, Kilwinning and Three Towns 3,122 3,184 62 0 0 0 3,122 3,184 62 50 12
: Garnock Valley, North Coast and Arran 3,538 3,595 57 0 0 0 3,538 3,595 57 54 3
:Intervention Services 1,788 1,793 5 0 0 0 1,788 1,793 5 9 (4)
: Care Experienced Children & Young people 22,550 24,465 1,915 0 0 0 22,550 24,465 1,915 2,857 (942)
: Head of Service - Children & Families 1,336 769 (567) 0 0 0 1,336 769 (567) (548) (19)
: Justice Services 3,099 3,099 0 0 0 0 3,099 3,099 0 0 0
: C&F Health Team 429 402 (27) 4,995 5,140 145 5,424 5,542 118 95 23
: Lead Partnership NHS Children's Services 0 0 0 762 778 16 762 778 16 13 3
CHIEF SOCIAL WORK OFFICER 1,954 1,750 (204) 0 0 0 1,954 1,750 (204) (205) 1
PRIMARY CARE 0 0 0 54,591 54,627 36 54,591 54,627 36 (69) 105
ALLIED HEALTH PROFESSIONALS 0 11,349 11,350 1 11,349 11,350 1 0 1
MANAGEMENT AND SUPPORT COSTS 10,510 8,997 (1,513) 3,223 3,710 487 13,733 12,707 (1,026) (1,115) 89
OUTTURN ON A MANAGED BASIS 166,555 169,763 3,208 175,420 177,560 2,140 341,975 347,323 5,348 6,205 (857)
Return Hosted Over/Underspends to East 0 0 0 0 (159) (159) 0 (159) (159) (591) 432
Return Hosted Over/Underspends to South 0 0 0 0 (139) (139) 0 (139) (139) (517) 378
Receive Hosted Over/Underspends South 0 0 0 0 50 50 0 50 50 50 0
Receive Hosted Over/Underspends East 0 0 0 0 159 159 0 159 159 40 119
OUTTURN ON AN IJB BASIS 166,555 169,763 3,208 175,420 177,471 2,051 341,975 347,234 5,259 5,187 72
Over/
(Under)
Spend
Variance at
Period 3
Movement in  
variance
from Period
3
TOTAL
Partnership Budget - Objective Summary
Council Health
2025/26 Budget

Page 46

2025-26 Savings Tracker          Appendix B 
Social Care:   
Ref Description
Deliverability
Status at
budget
setting
Deliverability             
Month 4
2025/26
Saving  
Previously Agreed Savings (Full year impact)      
1 Review of Day Care provision Green Blue 0.100
2 Service redesign  (CAAST Team and Corporate Parenting team) Green Blue 0.034  
Adjustments      
3 Payroll Turnover Green Blue 0.099  
Mental Health      
4 LD Responder Service Amber Amber 0.150  
Children, Families & Criminal Justice      
5 Brighter Pathways Amber Red 1.000  
Community Care & Health      
6 Review of Day Care provision Amber Blue 0.107
7 Care at Home Amber Green 0.500  
Cross Service 
8 Care Package Review (all services) Amber Amber 0.200
9 Deletion of vacant posts Green Blue 0.056
10 Increase to charging Green Green 0.186
11 Admin Post Savings Green Blue 0.114
12 Financial Inclusion  Green Blue 0.357 
TOTAL SOCIAL CARE SAVINGS   2.903

Page 47

Health:   
Ref Description
Deliverability
Status at
budget
setting
Deliverability             
Month 4 
2025/26
Saving 
Adjustments      
13 Increase recharge to East Ayrshire for beds at Woodland View Green Blue 0.010
14 Payroll Turnover Green Blue 0.079 
Other Savings      
15 Admin Savings Amber Blue 0.186 
16 Trindlemoss House - move to social care model Amber Amber 0.250 
17 EICT/Rehab Amber Blue 0.150 
18 Community MH/Wellbeing Review Amber Amber 0.100 
19 Ward 7A - Woodland View Amber Amber 0.341 
TOTAL HEALTH SAVINGS   1.116 
TOTAL NORTH HSCP SAVINGS   4.019

Page 48

2025-26 Budget Reconciliation               Appendix C 
COUNCIL  Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     137.739
Adjustments to baseline     0.014
Revised Budget     137.753
Resource Transfer 25/26 1-3   25.447
Additional Funding - 24/25 Adult Social Care
RLW 1-3 P 0.073
Additional Funding RLW 1-3 P 0.126
Additional Funding - Money Smart 1-3 P 0.094
ICT Transfers 1-3 P (0.005)
Additional Funding - Whole Family Wellbeing
Funds 1-3 T 0.179
CJSW - S27 1-3 P 3.280
Development of People working in Childrens
SW 1-3 P (0.390)
Roundings 3   (0.002)
Social Care Budget Reported at Month 4 166.555 
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Budget exc set aside     161.934
Month 10-12 Adjustments and adjusting
for the full year impact of part years
amounts and temporary funding.    
8.532
Revised Budget     170.466
Resource Transfer 24/25     24.640
Resource Transfer 25/26     (25.447)
NORTH NATIONAL INS 25-26 AMBUS 1   0.997
PRESCRIBING 25-26 AMBUSH 1   2.754
PRESCRIBING CRES 25-26 AMBUSH 1   (0.715)
Training Grade Adj - April 1   (0.058)
Training Grade Rates Adj - April 1   0.030
MH: Anticipate PDS Dementia (North) 25/26 1   0.094
MH: Anticipate Delivery of Veteran Specific
25/26 1   0.105
Anticipated RWW from SG 1   0.659
Anticipate 20% Tranche 2 ADP 1   0.174

Page 49

HEALTH Period 
Permanent
or
Temporary
£'m
Training Grade Adj - May 2   (0.013)
Bwp 25-26 East Chest Heart Stroke 2   0.001
Bwp 25-26 East Nest Expansion 2   0.023
Bwp 25-26 East - Sds Advice Service 2   0.013
Bwp 25-26 East Sub Prescribing 2   0.170
25-26 South Budget Paper - North Substitute
Prescribing 2   0.170
25-26 South Budget Paper - Pan Ayrshire
Chest Heart And Stroke 2   0.001
25-26 North Budget Paper - Pan Ayrshire
(vision Support Service 2   (0.005)
25-26 North Budget Paper - Pan Ayrshire
(community store) 2   (0.155)
HD52: EARLY INTERVENTION PSYCHOSIS 3   0.100
25-26 Pay Award Increase North 3   1.179
Training Grade Adjustment (Dean Funding) 4   0.011
Medical Pay Award - Senior Medical -
Additional 1% 4   0.086
Medical Pay Award - Specialty Doctors -
Additional 1% 4   0.006
Virement to Medical Directorate from Mental
Health Admin 4   (0.028)
Transfer MAT Standards Psychiatrist 0.2
WTE 4   0.029
Primary Care Prescribing Tariff Reduction 4   (0.556)
BBV transfer from Public Health 4   0.269
ANTICIPATED BUDGETS INCL HERE (NOT IN
LEDGER) 4   0.419
Roundings     0.001
Health Budget Reported at Month 4 175.420
TOTAL COMBINED BUDGET      341.975

Page 50

25-26 IJB Reserves Position      Appendix D 
Area of Reserves
Balance
at 31
March
2025
Earmarked Funds £
: Alcohol & Drug Partnership 353           
: Mental Health Action 15 135           
: Primary Care Improvement Fund 46              
: Service Redesign / Challenge Fund 780           
: Family Wellbeing Fund 934           
: Breastfeeding Network 36              
: MH Recovery and Renewal /Enhanced MH
Outcome Framework 365           
: Early Intervention in Psychosis 92              
: LD funding 82              
: Donation (Police Scotland) 1                 
: Primary Care Improvement Fund IP 303           
: GP Premises Improvements - tranches 1 and 2 3                 
: Dental Practice Improvement 29              
: Appropriate Adult 2                 
Total Earmarked 3,161

Page 51

Financial Recovery Action Plan          Appendix E 
FINANCIAL RECOVERY PLAN
£m £m
Projected Overspend at Month 4 5,259 5,259
SERVICE AREA
Orginal
Cost
reduction
target
Revised
Target at
Month 4
Achieved
at Month
4
Still to be
achieved
Target set                 
(IJB Date) Comment
a) Care home placements (60) (568) 0 (568) August 2025 -
month 3 report
This will bring the overall budget for
placements and charging order income online. 
b) Physical Disability Services (res,
community and DPs)
(575) 0 0 0 August 2025 -
month 3 report
Some PD residential packages £508K (prev
£575K) have moved to the older people Care
Home placements budget.  The older people
placements will need to manage  this transfer
within the existing budget.
c) Specialist Rehab wards (75) (75) (24) (51) August 2025 -
month 3 report
Based on planned action developed by the
senior manager.
d) Wards 1 and 2 (275) (275) (44) (231) August 2025 -
month 3 report
Based on planned action developed by the
senior manager.
e) Care at Home (300) (300) 0 (300) August 2025 -
month 3 report
Reflects the potential reduction to costs as an
impact of the SG investment in unscheduled
care
TOTAL (1,285) (1,218) (68) (1,150)
a) Learning Disabilities 0 0 0 0 August 2025 -
month 3 report
b) Community Mental Health services 0 0 0 0 August 2025 -
month 3 report
c) Lead Partnership for Mental Health :
- Adult Inpatients (150) (150) 0 (150) August 2025 -
month 3 report
Inpatient Review being undertaken
- Elderly Inpatients (50) (150) (50) (100) August 2025 -
month 3 report
Inpatient Review being undertaken 
-  Psychiatry (150) (150) (150) August 2025 -
month 3 report
Junior doctor rota still to be revised.
- Action 15 Reserves (486) (486) (486) 0 August 2025 -
month 3 report
Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South 
- Enhanced MH Outcome Framework
Reserves
(624) (624) (624) 0 August 2025 -
month 3 report
Draw down of the full pan Ayrshire reserve -
agreed with the CFOs at East and South
NORTH AYRSHIRE ELEMENT  38.65% (564) (603) (448) (155) August 2025 -
month 3 report
TOTAL (564) (603) (448) (155)
Health and Community Care Services
Mental Health Services
No cost reduction proposed but the service
need to maintain the current position.  All new
placements need to be offset by discharges or
reductions from care package reviews.

Page 52

FINANCIAL RECOVERY PLAN
SERVICE AREA
Orginal
Cost
reduction
target
Revised
Target at
Month 4
Achieved
at Month
4
Still to be
achieved
Target set                 
(IJB Date) Comment
Children and Justice Services
a) Residential Placements (1,000) (1,000) 0 (1,000) August 2025 -
month 3 report
Based on some placements moving to
tenancies and other placements moving from
external to in-house provision.
TOTAL (1,000) (1,000) 0 (1,000)
ALLIED HEALTH PROFESSIONALS 0 0 0 0 August 2025 -
month 3 report
No cost reduction proposed but the service
need to maintain the current position.
CHIEF SOCIAL WORK OFFICER 0 0 0 0 August 2025 -
month 3 report
No cost reduction proposed but the service
need to maintain the current position. 
MANAGEMENT AND SUPPORT
a) Payroll turnover (200) (200) 0 (200) August 2025 -
month 3 report
Increase to the current projection based on
dragging vacancies for 4 weeks after vacancy
scrutiny approval.
b) Transition slippage (100) (100) (17) (83) August 2025 -
month 3 report
Based on historic slippage.
c) Contractual inflation (25) (100) 0 (100) August 2025 -
month 3 report
TOTAL (325) (400) (17) (383)
OTHER AREAS
b) Agenda for Change - assume fully
funded
(838) (838) 0 (838) August 2025 -
month 3 report
Based on 100% cost of the half hour reduction
in working week being funded.
(838) (838) 0 (838)
TOTAL RECOVERY ACTION (4,012) (4,059) (533) (3,526)
Remaining projected overspend 1,733

Page 53

Bank and Agency Costs to Month 4      Appendix F 
Bank and Agency Costs M1-4 2025-26
1) NHS
4863
(Registered)
4864                      
(Unregistered)
4853
(Registered)
4854
(Unregistered) TOTAL
Average per
month
NORTH CORE SLT ADULT 2,243            2,243                561               
WARD 1 WOODLANDS VIEW 13,014          105,966        118,980            29,745          
WARD 2 WOODLANDS VIEW 10,433          163,458        173,891            43,473          
ACH REDBURN REHAB WARD NRS 13,388          67,121          80,509              20,127          
ACH DOUGLAS GRANT REHAB WD NRS 10,033          15,926          25,959              6,490            
WARD 3 WOODLANDS VIEW NURSING 4,009            163,350        167,359            41,840          
WARD 4 WOODLANDS VIEW NURSING 682               14,566          15,248              3,812            
NEW CLONBEITH NURSING(JURA) 42,815          35,539          78,354              19,589          
WVIEW THE GLEN ECT 1,854            1,095            2,949                737               
WVIEW WARD 10 ACUTE MH NRS 1,342            65,584          66,926              16,732          
WVIEW WARD 8 ACUTE MH NRS 7,224            348,128        355,352            88,838          
WARD 5 WOODLANDS VIEW 358               7,738            8,096                2,024            
WVIEW WARD 7B REHAB MH NRS 2,302            2,302                576               
NEW DUNURE NURSING(CLONBEITH) 15,397          57,881             73,278              18,320          
MH BED MANAGEMENT 5,180            5,180                1,295            
TRINDLEMOSS 25,494          80,544             106,038            26,510          
ARRAN HOSPITAL NURSING 24,985          16,973          41,958              10,490          
CAMHS UNSCHEDULED CARE 589               589                   147               
EARLY YRS-C/F TEAM 1 599               599                   150               
PACKAGE OF CARE (P) - AMG 47,860          47,860              11,965          
PACKAGE OF CARE (P) - LMO 312               312                   78                 
ARRAN DN 12,413          12,413              3,103            
NC POC TEAM 2 990               990                   248               
NC POC TEAM 3 2,701            2,701                675               
THREE TOWNS DN 101-               101-                   25-                 
IRVINE DN 11,776          11,776              2,944            
NORTH WEST COAST DN 15,024          15,024              3,756            
GARNOCK VALLEY DN 30,150          30,150              7,538            
NORTH AHP MANAGEMENT TEAM 3,515            3,515                879               
LADY MARGARET NURSING 5,274            2,873            8,147                2,037            
PREVENTION + SERVICES SPT TEAM 2,397            2,397                599               
LD HEALTH CHECKS 12,238          12,238              3,060            
NORTH CLDT 5,777            164               5,941                1,485            
LDS MANAGEMENT 2,286            2,286                572               
MHANPS MH UNSCHEDULED CARE 1,720            1,720                430               
MHS INPATIENT MGT 15,722          210               15,932              3,983            
CMHT NURSING-NORTH AYRSHIRE 1,697            1,697                424               
WVIEW WARD 7C FORENSIC REHAB N 2,207            39,395          41,602              10,401          
INTENSIVE COMMUNITY NURSING TEAM 13,430          335               13,765              3,441            
ADULT MENTAL HEALTH LIASION TEAM 13,881          13,881              3,470            
PCMHT NORTH 1,798            1,798                450               
WVIEW WARD 6 LOW SECURE NRS 14,683             54,904          69,587              17,397          
WARRIX AVE 30,178          29,983             60,161              15,040          
ICFN - COMMUNITY PHLEBOTOMY 4,709            4,709                1,177            
WVIEW WARD 7A LD A+T NRS 25,422             25,422              6,356            
WVIEW WARD 9 ACUTE MH NRS 11,528             11,528              2,882            
WVIEW WARD 11 ACUTE MH NRS 11,631             11,631              2,908            
WVIEW WARD 7A LD A+T NRS 402,876        1,804           14,532          419,212            104,803        
WVIEW WARD 9 ACUTE MH NRS 107,700        107,700            26,925          
WVIEW WARD 11 ACUTE MH NRS 48,625          48,625              12,156          
419,132        1,894,961     1,804           14,532          2,330,429 
2) SOCIAL CARE Month 4
Agency Cost
Montrose House 128,839
Mh Acm 13,606
Ld Acm 13,864
TOTAL 156,309
Bank Agency