Democracy Spraffa

Agenda Document Pack - Cabinet - 30/09/2025

North Ayrshire Council · 30 September 2025
Back to Cabinet — 30 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet
A Meeting of the Cabinet of North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on Tuesday,
30 September 2025 at 14:30 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the minutes of meeting of the Cabinet held on 2
September 2025 will be confirmed and the Minutes signed in accordance
with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973 (copy enclosed).
Reports by the Director (Health and Social Care Partnership)
3 Chief Social Work Officer Annual Report 2024/25
Submit a report by the Director (North Ayrshire HSCP) providing Cabinet
with awareness of the annual Chief Social Work Officer report which is
required by the Scottish Government (copy enclosed).
4 Integration Joint Board Financial Position
Submit report by the Director (North Ayrshire HSCP) providing Cabinet
with an update on the financial position of the IJB (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Reports by the Executive Director (Communities and Housing)
5 Local Housing Strategy 2023-2028: 2024/25 Progress Update
Submit a report by the Executive Director (Communities and Housing)
providing an annual update on progress of the Local Housing Strategy
2023-2028 and seeking approval for the update to be submitted to
Scottish Government (copy enclosed).
6 North Ayrshire Housing Allocations Policy 2025-30
Submit a report by the Executive Director (Communities and Housing)
seeking approval from Cabinet of North Ayrshire Housing Allocations
Policy 2025-30 (copy enclosed).
7 Proposals for Community Investment Fund (CIF) Expenditure
Submit a report by the Executive Director (Communities and Housing) to
determine applications by Locality Partnerships to allocate CIF funding to
proposed projects (copy enclosed).
Reports by the Executive Director (Place)
8 Interim Progress Report on the Second Ayrshire Local Flood Risk
Management Plan
Submit a report by the Executive Director (Place) on the progress and
next steps in relation to the publication of the Interim Progress Report on
the Second Ayrshire Local Flood Risk Management Plan (copy
enclosed).
9 Draft Local Coastal Change Adaptation Plans
Submit a report by the Executive Director (Place) on the completion of the
draft Local Coastal Change Adaptation Plans for ‘Sandylands Promenade
& Stevenston Beach’ and for ‘Irvine Harbour & Irvine Beach’ and seeking
approval for publication of the plans as the Council’s preferred policy for
coastal change adaptation as the two study areas (copy enclosed).
10 Urgent Items
Any other items which the Chair considers to be urgent.
11 Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following
item of business on the grounds indicated in terms of Paragraph 1 of Part
1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
12 Exempt Report: Historical Equal Pay Claims
Submit a report by the Head of Service (People and ICT) on the above
(copy issued separately by email).
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Cabinet Sederunt
Marie Burns (Chair)
Shaun Macaulay (Vice-Chair)
Tony Gurney
Alan Hill
Chloe Robertson
Christina Larsen
Chair:
Apologies:
Attending:
4

Page 5

Cabinet
2 September 2025 
At a Meeting of the Cabinet of North Ayrshire Council at 2.00 p.m. involving a
combination of participation by remote electronic means and physical attendance
within the Council Chambers, Irvine 
Present (Physical Participation)
Marie Burns, Alan Hill, Christina Larsen, Shaun Macaulay and Chloe Robertson, and
for consideration of Education Authority Business Elizabeth Turbet and Jacqui
McKenzie. 
Present (Remote Participation)
*Tony Gurney (Attended later in the meeting). 
In Attendance
C. Hatton, Chief Executive; S. Anson, Executive Director, A. McClelland, Head of
Service, K. McCormick, Executive Manager and L. Kayes, Policy and Performance
Officer (Child Poverty) (Education); D. Hammond, Executive Director and R. Leith,
Head of Service (Connected Communities) (Communities and Housing); R.
McCutcheon, Executive Director, L. Kirk, Head of Economic Development, Growth
and Regeneration and L. Cree, Head of Service (Sustainability, Transport and
Corporate Property) (Place); E. Stewart, Head of Service (Children, Families and
Justice) (Health and Social Care Partnership); M. Boyd, Head of Finance, D.
Forbes, Senior Manager (Strategic Business Partner), J. McCallum, Senior
Manager (Audit, Fraud, Safety, Risk and Insurance) and J. Walls, Team Manager
(Health and Safety) (Finance); J. McNeil, Senior Manager (ICT) and G. Alston,
Team Manager (ICT and Cyber Security) (People and ICT); A. Craig, Head of
Democratic Services, R. Lynch, Senior Manager (Legal Services), I. Hardy, Senior
Manager (Policy, Performance and Democracy) and L. Lewis, Information
Governance and Data Protection Manager, J. Hutcheson, Senior Communications
Officer (Media and Internal Communications) and C. Stewart, Committee Services
Officer (Democratic Services) (Corporate Services). 
Chair
Marie Burns in the Chair. 
1.  Chair’s Remarks 
Prior to commencing with the business of the meeting, Councillor Burns, Chair,
advised Cabinet that Councillor Johnson had recently stepped down from her
position as Cabinet Portfolio holder for the Health and Social Care Partnership,
and Councillor Chloe Robertson had replaced her as the new Cabinet Portfolio
holder for the Health and Social Care Partnership. 
Councillor Burns took the opportunity to thank Councillor Johnson for all her hard
work and diligence during her time as Cabinet Portfolio holder for the Health and
Social Care Partnership and warmly welcomed Councillor Robertson to her first
meeting of Cabinet as her replacement. 
Agenda Item 2
5

Page 6

2.  Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors. 
3.  Minutes 
The Minutes of the Meeting of the Cabinet held on 3 June 2025 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973. 
4.  Education Service Standards and Quality Report 2024-25 
Submitted a report by the Executive Director (Education) on publishing the Standards
and Quality Report (SQR), attached at Appendix 1 to the report, highlighting key
progress towards the Education Service improvement priorities and the National
Improvement Framework priorities made during session 2024-25. 
Officers responded to Members’ questions and the Cabinet noted the content of the
report and agreed to approve the publication of the Standards and Quality Report
attached at Appendix 1 to the report in accordance with statutory requirements. 
4. Education Authority Annual Service Improvement Plan 2025-26 
Submitted a report by the Executive Director (Education) seeking approval for
publication of the Education Authority’s annual Service Improvement Plan for 2025-26
attached at Appendix 1 to the report. 
Officers responded to Members’ questions and Cabinet agreed to (a) approve the
Service Improvement Plan for 2025-26, noting its alignment with the Council Plan
priorities and the National Improvement Framework (NIF) priorities; and (b) otherwise
note that, following approval, the Plan would be published and submitted to Scottish
Ministers, in line with statutory requirements. 
5. North Ayrshire Council (NAC) Education Service - Ayrshire Growth Deal
tool 
Submitted a report by the Executive Director (Education) on the development of the
Education Service’s Ayrshire Growth Deal tool for use by education establishments
(learners and staff). Cabinet received a demonstration on the operation of the tool. 
Officers responded to Members’ questions and Cabinet agreed to (a) note the content
of the report; and (b) endorse the purpose, use and further development of the tool
within NAC educational establishments. 
6. Child Poverty Action Plan Progress Report 2024-25 
Submitted a report by the Executive Director (Education) on the Child Poverty Action
Plan Progress Report 2024-25 attached at Appendix 1 to the report. 
Cabinet agreed to the publication of the Child Poverty Action Plan Progress Report
2024-25 attached at Appendix 1 to the report and its submission to the Scottish
Government in accordance with statutory requirements. 
6

Page 7

7. Regulation of Investigatory Powers (Scotland) Act 2000 
Submitted a report by the Head of Democratic Services providing an update on the
Council’s use of the Regulation of Investigatory Powers (Scotland) Act 2000 (RIPSA). 
Officers responded to Members’ questions and Cabinet agreed to note the measures
in place to secure compliance with RIPSA and the use the Council has made of the
Act since the previous report on the matter. 
8. Generative AI Policy 
Submitted a report by the Head of Democratic Services introducing a policy that
defined the procurement and acceptable use of ‘generative artificial intelligence’
enabled technologies within North Ayrshire Council environment. The draft policy and
business case were attached at Appendices 1 and 2, respectively, to the report. 
Officers responded to Members’ questions and Cabinet agreed to approve the policy
to ensure employees and Members were aware of the scope and acceptable use of
AI-enabled technologies. 
9. Our Council Plan Year End Progress Reporting including LGBF Analysis 
Submitted a report by the Head of Democratic Services for approval of the Council
Plan Year End Progress Reporting. The Local Government Benchmarking
Framework (LGBF) - Analysis of June 2025 Data Release, the six-monthly Council
Plan 2023-28 Progress Update, Year End 2024/25 and the Annual Performance
Report 2024/25 were attached at Appendices 1-3, respectively, to the report. 
Officers responded to Members’ questions and Cabinet agreed to (a) note (i)
progress within the LGBF Report as at June 2025 attached at Appendix 1 to the
report, (ii) Cabinet approval related to the content of the report, not the layout or
media used to ensure future flexibility for production of accessible format reports, and
(iii) the report would be presented to the Audit and Scrutiny Committee for
consideration at its meeting on 2 October 2025; and (b) approve (i) Our Council Plan
Six Monthly Progress Report 1 October to 31 March 2025 attached at Appendix 2 to
the report, and (ii) Our Council Plan Annual Performance Report attached at
Appendix 3 to the report. 
Note:  Councillor Gurney joined the meeting during consideration of the above item. 
10. Health and Safety Annual Report 2024/25 
Submitted a report by the Head of Finance providing Cabinet with an annual report on
the Health and Safety performance within Council Services during 2024/25. The
Corporate Health and Safety Annual Report and 3 Year Statistical Comparison was
attached at Appendix 1 to the report. 
Cabinet agreed to note the Annual Health & Safety Performance update for 2024/25
and the statistics covering a 3-year period. 
11. Revenue Budget 2025/26: Financial Performance to 30 June 2025 
Submitted a report by the Head of Finance on the financial performance for the
Council at 30 June 2025. 7

Page 8

Officers responded to Members’ questions and the Cabinet agreed to (a) note (i) the
information and financial projections outlined in the report, and (ii) the latest financial
projection for the Health and Social Care Partnership highlighted at section 2.6 of the
report; and (b) approve the virements detailed in Appendix 8 to the report. 
12. Capital Programme and Treasury Management Performance to 30 June
2025 
Submitted a report by the Head of Finance on progress in delivering the Capital
Investment Programme 2025/26 and the associated Treasury Management
performance to 30 June 2025. 
Officers responded to Members’ questions and Cabinet agreed (a) to approve the
virement proposal noted within the HRA programme detailed in Appendix 2 to the
report; (b) note (i) the revisions to budgets outlined in the report; (ii) the General
Services and HRA revised budgets at 30 June 2025 and the forecast expenditure to
31 March 2026; and (iii) the estimated performance against the Prudential Indicators
set out in the Treasury Management and Investment Strategy. 
13. Call for Views on the Children (Care, Care Experience and Services
Planning) (Scotland) Bill 
Submitted a report by the Director (North Ayrshire HSCP) providing a draft response
from North Ayrshire Council on the Children (Care, Care Experience and Services
Planning) (Scotland) Bill, for consideration and further feedback. 
Cabinet agreed to note the initial response submitted to the Scottish Parliament’s
Education, Children and Young People Committee and the position that any additional
response or comment could, thereafter, be supplied to that Committee separately.
Cabinet further requested that updates would be brought as appropriate. 
14. Proposals for Community Investment Fund (CIF) Expenditure 
Submitted a report by the Executive Director (Communities and Housing) to
determine applications by Locality Partnerships to allocate CIF funding to proposed
projects. An application from the North Coast and Cumbraes Locality Partnership by
Friends of Kirktonhall Glen was attached at Appendix 1 to the report. 
Having reviewed the application in line with the CIF criteria, the Cabinet agreed to
approve the application in relation to Friends of Kirktonhall Glen attached at Appendix
1 to the report. 
15. B714 Upgrade 
Submitted a report by the Executive Director (Place) on the progress of the B714
Upgrade. 
Officers responded to Members’ questions and Cabinet agreed (a) to approve the
submission of the Final Business Case to the UK Government for approval attached
as Appendix 1 to the report; (b) subject to approval of the Final Business Case and
funding allocation by UK Government, that Services progress land acquisition and
delivery of the project; and (c) otherwise to note the progress made to date on the
project. 
8

Page 9

16. Urgent Items 
There were no urgent items. 
17. Exclusion of the Public – Paras 8 & 9 
Cabinet resolved in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following item of
business on the grounds indicated in terms of Paragraphs 8 & 9 of Part 1 of Schedule
7A of the Act. 
Non Disclosure of Information 
In terms of Standing Order 21 (Disclosure of Information), the information contained
within the following report is confidential information within the meaning of Section
50A of the 1973 Act and shall not be disclosed to any person by any Member or
Officer. 
18. Exempt Report: Irvine - Proposed Sale of land 
Submitted a report by the Executive Director (Place) on the above. 
Officers responded to Members’ questions and Cabinet agreed to approve the 
recommendation as detailed in the report. 
The meeting ended at 4:15 p.m. 
The full meeting proceedings can be viewed at 
https://north-ayrshire.public-i.tv/core/portal/home 
9

Page 10

10

Page 11

NORTH AYRSHIRE COUNCIL 
30 September 2025 
Cabinet 
Title:    Chief Social Work Officer Annual Report 2024-25. 
Purpose:  To provide Cabinet with awareness of the annual Chief
Social Work Officer report which is required by the Scottish
Government. 
Recommendation:  It is proposed that Cabinet: 
1. Notes the contents of this report, in particular the successes
and challenges
2. Acknowledges the three key issues brought to the attention of
Cabinet 
3. Requests that the CSWO submit the annual report to Chief
Social Work Advisor in Scottish Government.   
1. Executive Summary 
1.1 There is a requirement for every Local Authority to appoint a professionally qualified
Chief Social Work Officer (CSWO) and this is contained within Section 3 of the Social
Work (Scotland) Act 1968 as amended by Section 45 of the Local Government etc.
(Scotland) Act 1994.
1.2  In line with the legislation and guidance, the CSWO is required to prepare an annual
report for the Council, on all statutory, governance and leadership functions of the
CSWO role.
1.3 This report was also presented to the Integration Joint Board on 25th September 2025. 
2. Background 
2.1 In 2014, the Office of the Chief Social Work Adviser, following consultation with CSWOs
across Scotland, SOLACE and others, identified a more standardised approach to the
annual report.
2.2 The report provides an overview by the CSWO of the partnership structures,
governance arrangements and the performance of social services in the context of the
demographic landscape of North Ayrshire. It looks more closely at the statutory
functions of the service and the quality and workforce development within services. 
Agenda Item 3
11

Page 12

2.3 The report highlights the range of Social Work activity throughout the year and places
that in the context of the socioeconomic challenges faced locally.  Within the report
there are three key issues I would like to bring to the attention of Cabinet: 
1. Practice.  
Practice remains strong. We have seen our workforce vacancy rate sit in to 10 – 12
percent range cross Social Work services. Our internal pipeline of graduates and
dedication from our practice educators and team managers is allowing us to maintain
staffing levels and to safely integrate newly qualified Social Workers.  Case reviews
across the year provide assurance on the leadership, value base and ethical nature
of Social Work practice and decision making. 
2. Public Protection.   
• The year past has seen a new independent chair for APC and CPC, Derek
Frew, who has offered fresh eyes and perspectives that have been supportive
of our strategic aims in public protection.  I would also wish to formally
acknowledge John Pattersons many years of service to North Ayrshire
following his retirement. 
• Our level of children subject to statutory measures remains high at 258 however
the number of orders terminating is down 30% from the previous year.  Child
Protection Orders are also at their highest levels since pre covid times. This
data begins to evidence the complexities and increasing risk profile which
directly impacts on our front-line Social Work capacity in children and families
Social Work. 
• Our justice services continue to see high levels of activity in relation to unpaid
work, and bail assessments which would reflect the courts seeking community
disposals given the pressures present within the prison estate.  I would also
commend the practice of our services in managing the early release scheme in
the year past. 
• Mental health and addiction services have maintained high levels of
performance in terms of accessibility to services.  The opening of the new
Mental Health Unscheduled Care Hub is an important development from a
Social Work perspective as last year’s concerns about the mental health and
wellbeing of our residents has shown no sign of diminishing.  In the year past
we saw emergency and short-term detentions pass last year’s record numbers
by 20% (emergency) and 14% (short term).  Alongside this, the number of
individuals for whom the CSWO is their legal guardian also increased to by 25%
to 151. 
• Our adult support and protection activity has also continued to see increased
activity with AP1’s and AP2’s at their highest level.  Underpinning this is a
continued steady number of adult concern reports which evidences a good
understanding from partners of risk and an understanding of the role of Social
Work services in assessing and managing risk. 
12

Page 13

• Considerable efforts have been made to strengthen our position in relation to
our understanding of how responses to the most significant incidents of
domestic violence safeguard women and children.  This is a complex area of
practice for agencies working together within a pan Ayrshire context.  With this
in mind, North Ayrshire has been working to understand and address the issue
of multiple referrals to the Multi Agency Risk Assessment Conference
(MARAC).  Alongside this North Ayrshire Council have invested in a new lead
officer post which is currently being recruited to in order to maximise the
coordination and impact of our interventions in this critical area. 
• Learning review requests continued to be received over the year with 2 reviews
commissioned.  Common themes reflect the increasing risk profile and levels
of distress being experienced. 
3. The impact of the financial context.  
Our risk exposure continues to grow with every passing month.  Last year’s overspend
of £3.593m of which £2.036 was in social care services placed financial strain on
parent bodies and reflects the level of need and demand present in our communities
and the increasing cost of delivering care.  Work underway in the development of the
2026-27 budget are worthy of early notification in terms of its impact on sustainable
service delivery options. 
In the social work and social care sector the ability to manage services is critically
driven by demand and capacity variables.  Professional advice offered has been clear
in relation to the risks of being able to meet all Social Work duties.  A clear position
has been taken in relation to the non-negotiable nature of leaving children or adults in
situations where they are likely to experience significant harm.  I am confident in the
judgement being exercised by the professional Social Work leads across service
areas in this regard. 
With the continued pressure on public finances in the immediate and longer term, the
backdrop of local population need described in the annual report requires us to ensure
the focus remains on managing risk and ensuring that every resource is utilised to its
maximum and reaches our most vulnerable residents first.  That invariably means that
in some cases residents will experience an absence of service that will be difficult for
them and their families. 
3. Proposals 
3.1 It is proposed that Cabinet notes the key themes and challenges detailed in the report
and that it endorses the report as set out in Appendix 1 and asks the CSWO to submit
this to Scottish Government.  
13

Page 14

4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 The delivery of Social Work services remains a statutory duty of North Ayrshire Council
whilst delegated to be delivered by the Health and Social Care Partnership. 
Equality/Socio-economic 
4.4 None 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 This report covers matters which contribute to the key priorities contained within the
Council and IJB strategic plans. 
Community Wealth Building 
4.7 None 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 This report highlights issues that have a direct and indirect impact on the rights of
children and young people particularly in relation to article 3.  Article 3 states that (1) in
all actions concerning children the best interests of the child shall be a primary
consideration. (2) States Parties undertake to ensure the child such protection and care
as is necessary for his or her well-being, taking into account the rights and duties of his
or her parents, legal guardians, or other individuals legally responsible for him or her,
and, to this end, shall take all appropriate legislative and administrative measures. (3)
States Parties shall ensure that the institutions, services and facilities responsible for
the care or protection of children shall conform with the standards established by
competent authorities, particularly in the areas of safety, health, in the number and
suitability of their staff, as well as competent supervision.   
14

Page 15

This report outlines child protection practices, a commitment to keeping families
together wherever possible and on the quality of residential and fostering services which
indicates how North Ayrshire works to uphold article 3. 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 The Partnership Senior Management Team and operational services have contributed
to the contents of this report 
Caroline Cameron
Executive Director / Chief Officer HSCP 
For further information please contact Scott Hunter, Chief Social Work Officer, on
scotthunter@north-ayrshire.gov.uk. 
Background Papers
Chief Social Work Officer Annual Report 2024 - 2025
15

Page 16

Chief Social Work Officer
Report
2024 – 2025
16

Page 17

Contents
Introduction .............................................................................................................. 1
Demographics .......................................................................................................... 2
Locality Planning...................................................................................................... 3
Progress 2024 to 2025 .......................................................................................... 3
Localities – Initial Insight ..................................................................................... 3
Garnock Valley ................................................................................................... 3
Irvine ................................................................................................................... 4
Kilwinning ........................................................................................................... 5
North Coast and Cumbrae ................................................................................ 5
Three Towns ....................................................................................................... 6
Arran ................................................................................................................... 7
Planned Activity .................................................................................................... 7
1. Governance, Accountability and Statutory Functions ................................... 8
1.1 Overview of the North Ayrshire Health and Social Care Partnership ......... 11
Visions, Values and Priorities ............................................................................ 11
2. Service Quality and Performance ................................................................... 12
2.1 Children, Families and Justice Services .................................................... 12
Brighter Pathways Programme Board ................................................................ 12
Whole Family Wellbeing Fund ........................................................................... 12
Promise Conference .......................................................................................... 13
Family Centred Wellbeing Service ..................................................................... 13
Child Protection Registrations ............................................................................ 14
Breastfeeding ..................................................................................................... 14
United Nation’s Convention on the Rights of the Child ...................................... 15
Child Healthy Weight ......................................................................................... 16
Health Visiting .................................................................................................... 16
Key Performance Indicators ............................................................................... 19
2.2 Adults ......................................................................................................... 22
North Ayrshire Drug and Alcohol Service ........................................................... 22
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
........................................................................................................................... 23
Anam Cara Refurbishment ................................................................................ 24
Mental Health Facility ......................................................................................... 26
17

Page 18

Trindlemoss Day Opportunities .......................................................................... 27
Out of Hours Social Work Service ...................................................................... 28
Self-Directed Support ......................................................................................... 28
Care at Home .................................................................................................... 29
Carers ................................................................................................................ 30
2.3 Criminal Justice .......................................................................................... 31
Multi Agency Public Protection Arrangements (MAPPA) ................................... 31
Community Payback Orders .............................................................................. 31
Drug Treatment and Testing Order .................................................................... 32
Diversion from Prosecution ................................................................................ 33
Case Study: Employability Mentors ................................................................... 34
Key Performance Indicators ............................................................................... 36
3. Resources ........................................................................................................ 39
3.1 Financial Pressures ................................................................................... 39
3.1 2025-26 Budget ........................................................................................ 39
3.4 Medium Term Financial Outlook .................................................................. 42
4. Workforce ......................................................................................................... 44
4.1 Workforce Planning .................................................................................... 44
4.2 Workforce Support and Development ........................................................ 46 
18

Page 19

1 
Introduction
Welcome.
It is a pleasure to introduce this year’s Chief Social Work Officer report for North
Ayrshire which covers the period 1st April 2024 through 31st March 2025. 
It is now very evident within the local context that because of sustained societal,
economic and wider macro political factors we are seeing a worsening picture in
terms of our ability to support everyone in our community who needs our support.
This is counter intuitive to the Social Work task. We see increasing demands for
services, rising complexity and comorbidity, escalating care costs, workforce
challenges, policy and legislative developments. 
The solution to the challenges we face lies in our commitment to partnership
working. From our interface with our NHS colleagues, Police Scotland and the wider
North Ayrshire Council, Social Work services model an approach that respects and
values difference and seeks the common ground to challenge inequality in our
society. This report evidences that despite these challenges Social Work and Social
Care services continue to deliver consistent services through the dedication of our
practitioners and their commitment to support and protect the citizens of North
Ayrshire. 
I am also pleased to report that our leadership and governance arrangements have
remained strong in the year past. Engagement and questioning by the Integration
Joint Board and NAC Executive Leadership Team on Social Work matters has been
productive and supportive. Alongside this our Social Work Governance Board has
offered direction on a range of key areas across all spheres of Social Work and
remains a lively forum for professional discussion with representation from all levels
of Social Work in North Ayrshire.
Finally, I would like to place on record my appreciation for the compassion and
commitment displayed day in, day out by our practitioners, managers, business
support staff and partners to ensure that Social Work and Social Care services are
delivered to the very best of our abilities. 
Scott Hunter
Chief Social Work Officer
North Ayrshire Health and Social Care Partnership 
19

Page 20

2 
Demographics
North Ayrshire is home to approximately 133,570 people, (National Records for
Scotland, Mid-2023 Population Estimates Scotland) all living in its many towns,
villages, and islands, with slightly more females (52.1%) than males (47.9%). 15.8%
of the population are aged 0 to 15 years, 9.3% are aged 16 to 24 years, 21.7% are
aged 25 to 44, 29.1% are aged 45 to 64 years of age, 13.2% ages between 65 to 74
years of age, with 11.0% of our population aged 75 years and above. 
The latest update of the Scottish Index of Multiple Deprivation has reconfirmed the
deep structural challenges faced by many communities in North Ayrshire, despite
steady progress by North Ayrshire Council in its ongoing commitment to eradicate
poverty. North Ayrshire is ranked as the fifth most deprived council area in Scotland. 
Some of the area’s most heavily affected by deprivation are concentrated in the
Three Towns and Irvine areas but areas in Kilwinning and the Garnock Valley also
have above average deprivation. 
20

Page 21

3 
Locality Planning
Locality Planning is the local mechanism for strategic planning in which local
priorities are developed for smaller geographical areas across the local authority. In
2023 it was decided that the framework for carrying out Locality Planning would be
revised in order to involve new methods for community engagement and ensuring
continued leadership through new Locality Chairs. The HSCP is now halfway
through its 2-year process to carry out extensive research in order to develop locality
plans with localised priorities and actions for each area. The research process
involves:
• Engagement: Twice per year, Locality Conversations will be held within each
locality in order to collect information from different people within the
communities, and feedback what we are doing with the information
• Local data: Overall locality data to identify the initial priorities and more in-
depth data on specific issues for each area.
• Local services: Mapping the existing services across each locality.
• Community Planning: consideration of the existing locality priorities the wider
community planning partnership is working towards.
Progress 2024 to 2025
The first set of locality conversations took place between the 15th and 22nd of April
2024 and were in the form of 2-hour workshops with local staff and members of the
public invited to intend. This allowed us to explain a bit about the new process and
collect initial community perceptions and challenges. There were 5 workshops held
with 32 participants.
In September 2024, local community groups that focussed on people with shared
characteristics were contacted and visited by an Engagement Officer to discuss if
there were any specific barriers experienced to accessing health and social care
services as a result of their shared or protected characteristics. The aim of this was
to ensure that the experiences of different equalities groups were captured in the
process, and they were visited at their own spaces to ensure attendance, and over
the month of September, 23 groups were visited with 206 participants.
Localities – Initial Insight
Garnock Valley
Garnock Valley seems to sit around the middle of the localities in terms of
performance indicators, but our residents still experience poorer outcomes when
compared to the Scottish figures. For example, 40.3% of the population lives within
the 20% most deprived areas and the child poverty rate in the Kilbirnie and Beith
Ward at 29.5% is above the general North Ayrshire rate of 29%.
All areas within North Ayrshire have a higher over 65 population than Scotland, with
Garnock Valley at 21.6% compared to Scotland’s 19.6% and North Ayrshire’s 23.3%,
21

Page 22

4 
and general health indicators are also around the middle of the other localities,
though Garnock Valley does have highest deaths per 100,000 for those aged 15-44.
Indicators for Garnock Valley are generally consistent across the majority of
outcomes that they perform better than North Ayrshire but worse than Scotland. This
is why it is important to recognise that although there are other localities with higher
poverty and deprivation, a higher older population, more complex health needs etc. it
still experiences issues when compared to other parts of Scotland. 
So far, 23 people from the Garnock Valley have participated in engagement between
the general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Poor transport links across the area and the impact of accessing
appointments and work.
• Access to GPs and possibility of targeted clinics for key issues in community
spaces.
• Finding information about health and care services. 
• Long waiting lists.
• Older population and digital accessibility.
Irvine
Irvine is the largest locality in North Ayrshire by population, and one of the more
accessible in terms of local services and amenities. According to data it has much
higher levels of deprivation than the national levels but is not as high as some of the
other areas in North Ayrshire, for example 45.7% of the population lives within an
area that is within the 20% most deprived in Scotland, which is only third highest
locally. For many indicators Irvine performs the poorest other than Three Towns,
such as for drug related hospital admissions, alcohol specific deaths, psychiatric
patient admissions. 
Unemployment is not as high as other areas, the third lowest in the area behind
Arran and North Coast and is about average for Scotland, and Health and Social
Work is the second highest employment sector behind wholesale and retail, and the
GVA per capita is higher than average for the area, possibly due to Irvine being the
most populous town in the area. 
So far, 98 people from Irvine have participated in engagement between the general
and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Low-level social interventions and community support groups in promoting
mental and physical wellbeing.
22

Page 23

5 
• Affordable leisure options and increased funding and support for community-
run initiatives.
• Increased patient voice in care planning.
• Difficulty in accessing reliable information about health and social care
services. 
• Outdated or incorrect online information makes it hard to navigate resources. 
Kilwinning
Kilwinning performs poorly for economic indicators, with the second highest rate of
unemployment and the second highest proportions of people living within the 20%
most deprived area in Scotland, behind Three Towns for both. Child poverty in the
Kilwinning ward is slightly higher than the North Ayrshire rate, which is higher overall
that Scotland, but it has increased by 8.3 percentage points between 2021 and 2022.
For general health, life expectancy is lower than the Scottish figures and North
Ayrshire averages but are again not as low as Three Towns for male and female,
and Irvine for female. The 65 plus population is the lowest in Kilwinning of all the
localities and it has the lowest rate of delated discharges of those 65 plus of the
localities and the Scottish and North Ayrshire rates, and the lowest unscheduled
acute specialty beds. 
For indicators related to substance use, Kilwinning is around the middle of the
localities, but still higher than the Scottish rates.  The averages are also affected by
far lower than average numbers for Arran and North Coast and far higher numbers in
Three Towns and Irvine. Similarly for prescribed anxiety medication, the rate is the
third highest of the localities but Three Towns, Irvine, Garnock Valley and Kilwinning
are all above the Scottish proportion. 
So far, 37 people from Kilwinning have participated in engagement between the
general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Centralised community hubs and improved transport links to enhance service
accessibility.
• Increased investment in self-care resources, clearer pathways, shorter waiting
times, and trauma-informed crisis support.
• Difficulty accessing information about services and accessing appointments.
• Other barriers were discussed such as financial, language, and digital.
North Coast and Cumbrae
The North Coast and Cumbrae (NC&C) locality is more affluent than other areas of
North Ayrshire, with fewer areas of deprivation, lower unemployment, and a higher
23

Page 24

6 
average house price than the other mainland localities. There is a much higher
proportion of older people with 32.3% of the population aged 65 and over, which is
12.7 percentage points more than the Scottish figure of 19.6%. 
Despite the older population, overall health indicators are better than other areas,
with a high life expectancy and lower rates of cancer registration, low rates of
hospital admission and death related to substance use, and lower rates of anxiety
medication and psychiatric admissions. These may also be related to the area’s
affluence when compared to the other localities. 
The only health indicator in the initial profiles that is higher in NC&C is unscheduled
acute specialty bed days per 100,000 population. Emergency admissions and A&E
attendances aren’t particularly different for the area so this may also relate to the
older population. 
So far, 21 people from North Coast have participated in engagement between the
general and targeted equality engagement.
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Importance of low-level and community-based support, particularly more
services around dementia and learning disability. 
• Poor transport links and access to patient transport.
• HSCP money allocation, and how this is communicated or understood by the
public.
• Care packages and decisions around them.
Three Towns
The Three Towns locality has poorer outcomes in many indicators when compared
to the other localities, as well as the national rate. The performance indicates that the
Three Towns locality experiences higher rates of poverty and socio-economic
disadvantage. The locality has the highest level of people living within the 20% most
deprived areas of Scotland at 57%, and also has the highest rates of child poverty,
and the highest unemployment rate of the localities, as well as lower house value
and more lower council band properties than other areas. 
Areas with higher levels tend to have poorer health outcomes, which is evident in the
general health indicators. Three Towns has the lowest life expectancy rates, as well
as high rates of emergency admissions. The Three Towns locality has the highest
figures out of all the localities and is much higher than the Scottish and North
Ayrshire averages for indicators related to alcohol and drugs, and alongside Irvine
has the highest rates for indicators related to mental health care. 
So far, 19 people from Three Towns have participated in engagement between the
general and targeted equality engagement.
24

Page 25

7 
Initial issues discussed in the Locality Planning Review groups and engagement
have included:
• Accessibility of primary healthcare services, particularly the challenges in
booking appointments, long waiting times, and the difficulties faced by those
with mobility issues.
• The impact of social deprivation on mental health was noted, alongside the
necessity for targeted support across various stages of mental health issues,
from prevention to post-crisis care.
• Difficulty accessing information about services or knowing where to go.
• Discussion of methods to reduce harm from drugs and alcohol, to improve
safe drug use and reduce stigma.
Arran
Arran has an established locality planning arrangement which has been in place for
many years due to the specific and persistent challenges of the Island. These
arrangements have a governance that sits under the Island Plan and the Health and
Social Care Partnership will develop health and social care priorities for Arran under
this existing governance structure and using engagement that has already been
carried out with the islanders. This will occur using the same timescales as our
mainland localities.
The Key themes of the Arran Island Plan are:
• Economy
• Community
• Environment
A Health and Social Care Locality Plan for Arran will be consistent with these
existing themes and aim to focus on how health and care needs will be met in Arran.
Planned Activity
Over 2025 to 2026, the HSCP will carry out engagement with children and young
people, and further engagement with services users in September 2025. Collected
data will be analysed to inform each locality’s priorities, and the data and
engagement will be analysed to identify the key priorities.
The Strategic Plan is currently under revision and once complete, Locality Plans will
be developed and published for each locality and annual reporting for each will
commence. 
25

Page 26

8 
1. Governance, Accountability and Statutory Functions
The Chief Social Work Officer is a statutory appointment by virtue of Section 3 of the
Social Work (Scotland) Act 1968. The Chief Social Work Officer is appointed for the
purposes of the Council's functions under the 1968 Act and under those other
enactments listed in Section 5(1B) of that Act. In broad terms, those functions cover
all social work and social care services whether provided directly by the council, in
partnership with other agencies, or procured by the council and provided by others
on its behalf. Those functions are referred to as “social work services”. 
The qualifications required for the post are set out in the Qualifications of Chief
Social Work Officers (Scotland) Regulations 1996. The Chief Social Work Officer is
required by section 5(1) of the 1968 Act to carry out the duties of the post under the
general guidance of the Scottish Ministers. The Scottish Ministers issued revised and
finalised guidance in January 2010. 
The overall powers of the Chief Social Work Officer post are:- 
(a) To oversee the discharge of the council's statutory social work duties; 
(b) To ensure the provision of effective professional and objective advice to elected
members and officers of the Council in the Council's provision of social work
services; 
(c) To secure the effective provision of social work services. 
The powers of the Chief Social Work Officer fall into two broad categories; service
provision and corporate responsibility:
Service provision
• To establish and develop social work services focussed on the needs of
service users, to promote the continuous improvement of those services, and
to monitor and raise standards of their delivery; 
• To ensure the effective governance of the balance of need, risk and civil
liberties in the provision of social work services in accordance with
professional practice; 
• To provide advice on all aspects of workforce planning including safe
recruitment practice, supervision, monitoring and assessment of social work
students, securing of professional qualifications and continuous learning and
development for staff, and supporting and advising managers in all aspects of
staff supervision; 
• To ensure the existence of systems to both promote good practice and
identify and address poor practice in the provision of social work services; 
• To ensure that significant case reviews are undertaken of all critical incidents
either resulting in, or which may have resulted in, serious harm or death; and 
26

Page 27

9 
Corporate Responsibilities
Corporate responsibility
The Chief Social Work Officer has the following corporate powers which require
direct access to the Council's Chief Executive’, Elected Members of the Council and
the Chief Officer, and the provision of forthright and independent advice to them:- 
• To ensure compliance with the Council’s statutory duties to prepare, publish
and review plans for the provision of social work services. 
• To promote, communicate, support and review values and standards of
professional practice, and to ensure that they are adhered to. 
• To establish, in conjunction with the Council's Corporate Management Team,
appropriate experience and qualified cover for the post of Chief Social Work
Officer during the post-holder's absence or incapacity. 
• To report to the Chief Executive and Chief Officer any failure in the Council's
corporate policy or governance arrangements designed to reflect the proper
balance amongst need, risk and civil liberties in the provision and
management of social work services. 
• To report to the Chief Executive and Chief Officer any weaknesses and
failures in the systems in place to promote good practice and identify and
address poor practice in the provision of social work services. 
• To report and provide independent comment where necessary to the Chief
Executive, Elected Members of the Council and the Chief Officer on the
findings of significant case reviews and relevant performance reports and on
any other social work related issues. 
• To provide an annual report to the Council on all of the statutory, governance
and leadership functions of the role of the Chief Social Work Officer
North Ayrshire continues to invest in its oversight of Social Work activity through the
provision of a standalone Chief Social Work Officer, further supported by a formal
Depute CSWO. The CSWO reports directly to the Director of the NAHSCP and has a
direct line to the Chief Executive of the Council. The CSWO represents Social Work
within a range of strategic groups including:
IJB, IJB Performance and Audit Committee, IJB Strategic Planning Group, NAHSCP
Health Care Governance Committee, HSCP Partnership Senior Management Team,
Alcohol and Drugs Partnership, Child Protection Committee, Adult Protection
Committee, Chief Officers Group, Carers Advisory Group, Children’s Services
Strategic Planning Partnership; Corporate Parenting Board, Transitions Strategic
Group amongst others.
The CSWO also provides professional oversight as a member of the Care Home
Oversight Group and the Care at Home Oversight Group. These groups continue to
fulfil key governance activity in relation to the Social Care sector. 
27

Page 28

10 
The CSWO has regular contact with the Independent Chair of CPC and APC to
ensure public protection oversight. The year past has seen North Ayrshire
commission one learning review. 
Social Work and Social Care matters are regularly reported to the IJB and Clinical
and Care Governance Committee. There is a particular focus on the impact of policy
and external scrutiny activity. The CSWO maintains regular calls with our Care
Inspectorate strategic link to share developments and hear of national developments
that support activity in North Ayrshire. The CSWO also contributes to quarterly calls
with the inspectorate and the broader PSMT.
The primary governance of practice matters remains the Social Work Governance
Board. The board terms of reference and membership have been refreshed in the
current year with the support of the professional leadership group. The board has
had a full agenda of issues over the year and has provided support and governance
in relation to a range of matters including:
• Practice Guidance for Social Workers Assessing Capacity and Practice
Enhancement Notice: In Person Assessments for Complex Cases 
• Re-modelling of acute in-patient service for adults with learning disabilities
• Chronology Training and Practice Improvement
• Community Justice Outcome Implementation Plan (CJOIP)
• HSCP Refugee and Resettlement Team Transition
• National Social Work Agency Workforce Improvement
• AWI Delayed Discharge - best practice
• Test of Change – All Age Disability Service 
28

Page 29

11 
1.1 Overview of the North Ayrshire Health and Social Care Partnership 
Visions, Values and Priorities
Our Partnership includes health and social care services within Health and
Community Care Services (H&CC), Mental Health and Learning Disability
Services and Children, Families and Justice Services. 
In this report, we look back on the progress we have made, share some of our
successes and reflect on some areas that have proved challenging. 
This report aligns with our “Caring Together” Strategic Commissioning Plan 2022-
2030. This is the first time the Health and Social Care Partnership has set out such a
long-term plan for how we intend to improve services and the health and wellbeing of
the local community. The plan set out our pandemic recovery intentions, as well as
offering a longer-term vision for local health and social care services. Over the period
of this strategic plan, the Health and Social Care Partnership will seek to: 
We see these priorities as interlinked, and we expect that where we see success
against one priority, it’s effect will positively impact against others.
People who use our services and North Ayrshire residents will experience our
Partnership values in the way our staff and volunteers engage with you and how we
behave. We will treat you with: 
29

Page 30

12 
2. Service Quality and Performance 
2.1 Children, Families and Justice Services
Brighter Pathways Programme Board
A transformation programme to improve outcomes and opportunities for care
experienced children and young people in North Ayrshire is now under way, with
progress being made since its launch in April 2024.
The Brighter Pathways Programme Board was set up to look at how services can
be delivered differently to ensure care experienced children and young people have
access to the appropriate resources and supports into adulthood.
In line with its Promise commitments, North Ayrshire Health and Social Care
Partnership (NAHSCP) has a firm focus on providing the right support and
intervention to allow children and young people to remain with birth family or wider
family wherever possible, preventing them from coming into local authority care - for
example, being placed in foster care or in residential children’s houses. 
To build on this already established early intervention work, the Board is currently
looking at the supports available for families to identify if there are any gaps in
service provision where additional early help and more intensive support could help
more children to remain with their
families.
An acute challenge in recruiting and
retaining foster carers is having an
impact nationally, which has been
further impacted by the current cost
of living crisis and a reduction in the
number of potential foster carers
having spare bedrooms due to an
increase in home working and their
own children staying at home for
longer.
Recruiting foster carers for NAHSCP is further impacted by a number of independent
fostering agencies operating in the area and taking on carers. In a bid to boost
recruitment, which is a priority for the programme board, an investment in a long-
term digital marketing campaign has recently been agreed, working with a provider
that has a proven track record in local authority foster care recruitment.
Whole Family Wellbeing Fund
In 2022, the Scottish Government created the £500 million Whole Family Wellbeing
Fund (WFWF) for the life of the current parliament (2022 to 2026) to facilitate the
delivery of holistic family support, with the expectation this will reduce inequalities in
family wellbeing, lessen requirements for family crisis intervention and decrease the
number of children and young people living away from their families.
30

Page 31

13 
The Fund is now in year three of the four-year implementation period. There are a
total of 16 projects and services in North Ayrshire that have benefitted from WFWF
including, Family Centred Wellbeing Service, Dads Worker, Barnardos Stronger
Families and Helping Hands. Seven projects are Third Sector projects, six are
NAC/HSCP projects while 3 are independent projects.
Promise Conference
The Annual Promise Conference 2024 was held on Monday 9th December and
saw 73 young people from across our Secondary Schools join for a day of
connection.
The aims of the Conference were to:
• Introduce young people to The Promise Plan 2024-2030.
• Offer workshops centred around The Promise’s foundation of voice.
• Allow time for building connections with other young people and Corporate
Parents.
The day was hosted by Donna Anderson, North Ayrshire Council’s Youth
Participation and Democracy Officer, and Adam Johnson, local Care Experienced
young person and MSYP for Cunninghame North. 
Young people were involved in the planning of the Conference at all stages. This
year’s agenda included interactive workshops delivered by local Corporate Parents
nominated by young people.
Family Centred Wellbeing Service
The Family Centred Wellbeing Service (FCWS) are a team of 14 wellbeing workers
who support families with children between the ages of 5-18. We support over 170
families in North Ayrshire, with sessions provided within the family’s homes, within
our offices, community buildings, and schools. We seek to build on existing parenting
capacity and provide practical support, advice, and guidance that will enhance family
wellbeing and relationships.  This approach allows us to ensure that 85% of families
receiving support require no further interventions following this support.
The team use the facilities in Meadowcroft to bake/cook with our families, giving
them an opportunity to connect, bond and learn life skills that can have a positive
impact on their wellbeing and finances. We use the garden to develop play-based
skills and to encourage positive mental health and wellbeing.
Over the summer, the team devised and facilitated a summer programme that ran
twice a week for the full summer for our families. They utilised accessible community
resources in every area (for example, Fairlie beach, low green Irvine, Dalry Park,
Eglinton Park, Ardeer Beach) and did free activities for our families to help build their
confidence and show parents and carers how to access outdoor activities that will
have a positive impact on their physical and emotional health. It also encouraged
31

Page 32

14 
families to access local community resources and build further contacts within the
community, reducing the impact of social isolation.
Child Protection Registrations
In 2024 to 2025 there were 156 Child Protection registrations and 178 De-
registrations. The greatest number of registrations were found in September, when
there were 22 registrations within the month. The lowest number of registrations
occurred in November, when there were 5 registrations within the month. The
median number of registrations per month across the year was 12.5. 
Breastfeeding
Breastfeeding rates - the published data for 2023 to 2024 has shown the following
improvements in breastfeeding indicators from an NHS Ayrshire and Arran
perspective:
Indicator 2022/2023 2023/2024
% breastfeeding at initiation 54.6 57.6
% exclusive breastfeeding at first HV contact
(10-14 days)
27.4 30.5
% exclusive breastfeeding at 6–8-week HV
assessment
22.8 25.6 
Similarly, the published data for 2023 to 2024 has shown the following improvements
in breastfeeding indicators from a North Ayrshire perspective: 
32

Page 33

15 
Indicator 2022/2023 2023/2024 Variance
% breastfeeding at initiation 53.0 59.6 6.6%
increase
% exclusive breastfeeding at first HV
contact (10-14 days)
23.2 30.5 7.3%
increase
% exclusive breastfeeding at 6–8-
week HV assessment
20.3 25.6 5.3%
increase
The benefits of breastfeeding on the short and long-term health of mothers and
babies have been well documented. It promotes optimum nutrition, growth and
development for babies, as well as providing comfort and protection from infections.
As such, breastfeeding is actively promoted and supported in a wide range of
settings across North Ayrshire and Arran.
North Ayrshire Health and Social Care Partnership’s Children and Families Health
Team has prioritised investment in infant feeding support through local health visiting
teams, as well expanding the Scottish Government’s Breastfeeding Friendly
Scotland (BFS) scheme in North Ayrshire and providing additional specialist support
for families with more complex feeding issues via the Community Infant Feeding
Team.
United Nation’s Convention on the Rights of the Child
This year, the United Nation’s Convention on the Rights of the Child (UNCRC)
was fully incorporated into Scots Law - The Children and Young People's
Commissioner Scotland.
The UNCRC articles provide for every aspect of a child’s life from birth up to the age
of 18 years. Guidance around UNCRC is clear that incorporation and adherence to
UNCRC is the responsibility of all public sector organisations and services, including
those services viewed as “adult services.”
To support our work within the HSCP, it was seen as critical to establish a baseline
of understanding and preparedness for implementation across all services. As such,
in November 2024, using the Improvement Service’s Getting Ready for UNCRC
Incorporation Framework document, a benchmarking document was developed with
an ask that all services within the HSCP complete to the best of their ability. 
Responses provided related to current practice within each service. Results have
been shared with all services. Moving forward each service will use the
benchmarking exercise to identify compliance and any areas that require special
attention to ensure implementation. 
33

Page 34

16 
Child Healthy Weight 
Child healthy weight is a public health priority. Over the last three decades, obesity
levels in children and, indeed, the wider population have increased, with inequalities
observed across our communities. Maintaining a healthy weight throughout
childhood is associated with many health benefits both in the short-term and the
medium term. 
Child healthy weight is monitored throughout the universal Health Visiting pathway
but also when a child moves into Primary 1. The most recent data for 2023 to 2024
was released in December 2024. For North Ayrshire:
• 74.8% of P1 children were of a healthy weight.
• 12.4% of P1 children were at risk of overweight.
• 11.9% of P1 children were at risk of obesity. 
Health Visiting
The Health Visiting service in North Ayrshire continues to fully implement the
national Universal Health Visiting Pathway, with all children under 5 and their
families offered a minimum of 11 visits from the ante-natal period through to the child
starting school. Developmental assessments are undertaken at 13-15 months; 27-30
months and 4-5 years. Since 2020, the percentage of children with one or more
developmental concern at these assessments has increased as shown in the table
below:
A slight improvement in developmental concerns at the 27–30 month assessment
has been observed in the last twelve months but a significant increase in concerns at
the 4-year review have also been noted, as well as a slight increase in concerns at
the 13–15-month review.
34

Page 35

17 
This trend is not unique to North Ayrshire and the Scottish Government has set out
actions to attempt to address this nationally within the recently published Enhancing
the Delivery of the Health Visiting Service: Scotland’s Health Visiting Action Plan
2025-2035 (Scottish Government, 2025). Locally, we have undertaken a review of
our Early Years Support Team and have established closer working relationships
with early years education colleagues to take forward a programme of work that
includes improved information sharing about developmental concerns at an earlier
stage; enhanced links between the HV service and early years establishments; a
focus on communication needs in children as a priority within our Getting it Right for
Every Child (GIRFEC) Steering Group; and shared work around supporting more
children to be toilet ready in the early years. 
Our Early Years Support Team works alongside the Health Visiting team to provide
support to families when developmental concerns are identified or when a family
requests additional support in other areas. During 2024 to 2025, 933 children and
their families were supported, an increase of 10.3% from 2023 to 2024, in areas
such as communication, sleep, toileting, home conditions, parental mental health
and routines.
During 2024 to 2025 we expanded our partnership with national charity Dads Rock
to bring a second dads’ worker to the area. This has allowed us to offer 1-1 and
group support to dads in the Irvine and Kilwinning areas, as well as the original
Three Towns area. During 2024 to 2025, 53 dads have been supported with 81
children being positively impacted.
Child to Adult Disability Transitions
Prior to commencing an active role with the children with a disability team, a baseline
of current functioning was obtained. The qualitative data for baseline was obtained
through staff caseload reviews this included reviewing assessments and care plans,
in addition to case notes held within CareFirst. This evidenced that current supports
available to children, young people and their families is not sufficient in providing
35

Page 36

18 
adequate support. The supports available are mainly social supports and residential
respite. Although these supports offer families a short break from their caring
responsibility, it is not fully addressing issues in relation to daily management of
personal care and behaviours that challenge, leading to carer burnout and young
people reaching crisis.
Further findings of the service review found that current transition planning has
become a process driven activity. Factors impacting transition planning include late
referrals to Transition Planning Group (TPG) and an inability to screen/allocate staff
in adult social work teams to screen referrals and/or allocate workers for
assessments, leading to a tick-box exercise when completed. This approach
ultimately has a negative impact on a young person's transition, with often late
and/or rushed assessment and resource allocation. Current processes are not
undertaken in a person-centred manner.
In order for young people to thrive as they transition to adulthood, the following was
identified:
• Assessment and case note training for staff.
• Outcome and Goal Setting training for staff.
• Review eligibility criteria for children and adult social work.
• Collaborative work with our partner agencies to promote skill generalisation
between school, community supports and respite for better outcomes for
young people.
• Personal Care needs to be addressed to support families in the day-to-day
care of children and young people with disabilities, through a Care at Home
type service. This is multifaceted in relation to relieving carer burnout and also
developing and promoting independent life skills in young people, which will
support their transition to adulthood.
• Proactive use of legislative measures to ensure children and young people
are protected.
• Review TPG and its Terms of Reference to return to a person-centred
decision-making forum. 
• Referral screening processes to be developed.
• Increased joint working from the age of 14-years from adult social work to
provide advice and guidance.
• Review age restrictions in children and adult social work to allow transitions to
happen at the right time, between ages 16-years and 21-years.
• Review of resource allocation processes for a more standardised approach.
36

Page 37

19 
Key Performance Indicators
Child Protection 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Child Protection Concerns 849 885 756 570 361 444
Child Protection Investigations
(CP1s) 447 443 432 375 197 421
Child Protection Initial
Conferences 123 121 119 76 83 170
Pre – Birth Conferences  41 29 34 17 22 14
CP Initial/Pre-Birth Conferences  4 7 4 9 1 10 
Looked after Children 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children newly accommodated in North Ayrshire 84 63 49 61 46 52 
** Where the number of children accommodated = the number of children either admitted into any placement type except “At Home
with Parents”/”With Friends/Relatives” OR moved from “At Home with Parents”/”With Friends/Relatives” to any other placement
type  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Foster Carers  98 103 99 96 105 107 
37

Page 38

20 
Permanency Planning 2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Number of permanency plans approved 30 10 21 19 15 6
Adoption – approved and placed  3 8 5 7 4 2
Adoptions granted 8 4 5 5 7 5
Permanence orders approved  11 3 7 7 7 6
Permanence orders granted 8 0 1 2 9 2 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children Subject to Compulsory Supervision Orders 393 351 342 298 271 258 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Children with Compulsory Supervision Orders Terminated 140 102 101 102 117 69 
Emergency Placements  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Child Protection
Orders  32 39 11 18 14 22 
Secure Placements  
2019–20 2020–21  2021–22  2022-23 2023-24 2024-25
Number of secure
placements 4 1 2 0 2 3
38

Page 39

21 
Justice Services  
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Number of reports submitted to the courts
(CJSW reports, Section 203, Short Notice
CJSW & Supplementary CJSW)
763 430 606 606  668 707
Number of home leave and background reports
submitted 
151 (66
leave
reports, 85
background
reports)
114 (39
leave
reports, 75
background
reports)
93 (30 leave
reports, 63
background
reports)
91 (28 leave
reports, 63
background
reports)
112 (41
leave
reports, 71
background
reports)
112 (42
leave
reports, 32
background
reports 38
TARL)
Unpaid Work Requirements 360 94 172 313  310 329 
2019–20 2020-21 2021–22 2022-23 2023-24 2024-25
Level 1 Mappa  163 152 172 190 174 188
Level 2 Mappa  7 10 14 27 11 13
Level 3 Mappa  5 3 7 2 2 1
39

Page 40

22 
2.2  Adults
North Ayrshire Drug and Alcohol Service 
The North Ayrshire Drug and Alcohol Service (NADARS) has continued to
demonstrate high levels of performance by meeting national and local standards and
targets, such as access to treatment waiting times, provision of alcohol brief interventions
(ABIs), the roll-out of Naloxone supplies and increasing patient choice regarding Opiate
Substitution Therapy (OST) medications.
Figures for those seen within 3 weeks for Alcohol were no lower than 96% during any
quarter, while those seen within 3 weeks for Drugs were no lower than 99% during any
quarter in 2024 to 2025. 100% of referrals for Alcohol and Drugs were seen within 6
weeks. 
The team continues to identify new ways of working to provide a more agile and
streamlined service and further improve performance. This work has been evidenced by
40

Page 41

23 
the delivery of early intervention services in the delivery of Alcohol Brief Interventions
(ABI) in both priority (Primary Care, A&E and Antenatal) and wider settings.   
North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation (eICT)
The North Ayrshire Model for Enhanced Intermediate Care and Rehabilitation
(eICT) utilises multidisciplinary holistic interventions to focus on providing high-quality
care and support, through proactive early intervention and preventative action. They aim
to assist patients presenting with falls, frailty, low grade infections and general functional
decline to avoid hospital admission where possible and facilitating early discharge home
from hospitals. 
2022-23 2023-24 2024-25
Target set by Scottish Government – Priority Settings  3,420 3,420 3,420
Total ABI delivery in Priority Settings (Ayrshire & Arran) 4,933 6,398 5,940
Indicator 2022-23 2023-24 2024-25
Target set by Scottish Government in Wider Settings  855 855 855
Total ABI delivery in Wider Settings (Ayrshire & Arran) 1,207 1,216 1,325
41

Page 42

24 
The North Ayrshire Enhanced Intermediate Care Team brings together the expertise of
dedicated Physiotherapists, Occupational Therapists, Technical Instructors, Dieticians,
Community Psychiatric Nurses, Pharmacists, Admin workers, Rehabilitation Nurses,
Advanced Nurse Practitioners, and Intermediate Care GP with special interest into one
single multidisciplinary and interdisciplinary team; focused on problem-solving for
patients in their own homes across all of mainland North Ayrshire. The seven-day
rehabilitation service facilitates early discharge from hospital and provides a rapid
alternative to acute hospital admissions. The Enhanced part of the team addresses
medical and clinical issues that limit a patient’s ability to engage in rehabilitation via a
shared care model with the patients registered GP. 
Anam Cara Refurbishment
Support for people with dementia in North Ayrshire received a boost after Anam Cara
respite centre in Kilbirnie was officially reopened with a ribbon-cutting ceremony on
Tuesday 4th June following an extensive refurbishment project.
The specialist dementia respite centre accommodates up to 9 guests aged 60 years or
over, offering critical respite services
within single room, en-suite
accommodation. The support service,
which is run by North Ayrshire Health
and Social Care Partnership, had been
temporarily relocated to the vacant
Taigh Mor site in Beith to allow the
service to continue while works were
carried out.
The refurbishment project included a
complete transformation of the main
garden area, including new garden
furniture, with a ramp installed from the
42

Page 43

25 
conservatory to allow better access for guests to enjoy the outdoors. An additional,
smaller garden area adjacent to the dining area has also had some landscaping
improvements made. 
A full revamp of the internal areas of the building has also been carried out, with works
including wet wall installation in several of the bathrooms, replacement light fittings with
energy-efficient LED bulbs and a full upgrade to the reception area. An archway has
been created within the dining area to improve the space, allow better access to the
outdoors and create an improved flow for staff moving around the area, and a new boiler
and generator have been installed.
43

Page 44

26 
Mental Health Facility
NHS Ayrshire & Arran has officially opened a new, nurse-led Mental Health Unscheduled
Care Assessment Hub. Recognised as the first of its kind in Scotland, the hub aims to
deliver a new model of care.
The Mental Health Unscheduled Care Assessment Hub, based at Woodland View in
Irvine, provides a patient-focused, therapeutic space to support the delivery of
compassionate care to those individuals with acute mental illness who would be eligible
to access an adult acute mental health bed for ongoing intensive assessment.
Managed and coordinated by the Mental Health
Unscheduled Care Service, the hub provides 24-hour
access to mental health assessment and interventions. The
service is delivered by experienced Registered Mental
Health Nurses within a therapeutic environment for a period
of up to 72 hours and will be able to accommodate up to five
patients. 
North Ayrshire Health & Social Care Director, Caroline
Cameron explained, “We are delighted to be able to officially
open this new service.
“We piloted the hub earlier this year for a small number of
patients. We are now ready to open at full capacity and provide those living in Ayrshire
and who are experiencing acute mental illness with this new way of working.”
The hub aims to:
• improve the patient journey through the Mental Health Unscheduled Care Service.
• facilitate closer working and a smoother patient journey between community and
inpatient services.
• reduce the number of unscheduled admissions to acute adult inpatient mental
health beds.
• reduce the waiting time for planned adult acute admissions.
• reduce the number of initial assessments carried out in acute wards releasing
resource for treatment.
• provide training opportunities in assessment of mental illness for clinical staff. 
44

Page 45

27 
Trindlemoss Day Opportunities
Trindlemoss Day Opportunities in Irvine has been praised in a report by the Care
Inspectorate after an unannounced inspection visit in October, with the majority of areas
looked into being rated as ‘very good’ by the national regulatory body.
The service, which opened in 2020, provides tailored support for over 100 people with
learning disabilities from its base in Tarryholme Drive in Irvine.
The inspector identified a number of significant strengths within the service, with
customers found to be ‘supported in stable groups by consistent staff who know them
well’. The ‘warm, respectful and kind interactions between staff and people supported’
were also highlighted in the report. 
Support was found to be tailored to each individual’s identified outcomes, with the service
maintaining a flexible approach that allows customers to access a range of groups and
activities of their choice. Regular project topics also provide multiple opportunities for
themed activities and trips to associated places. 
Health promotion and education is
integrated into activities,
empowering people to take
control of their health and
wellbeing, with the service also
making use of local facilities such
as the swimming pool and gym.
These trips also provide a chance
to enhance travel and life skills.
Trindlemoss Day Opportunities
was also praised for its strong
links to the local community, providing support for lunch clubs, play groups and dementia
support groups, as well as assisting with gardening and litter picking.
Additionally, the Baristamoss Café is open to the local community several days a week,
providing employment training and boosting the development of social skills for those
supported.
In terms of staffing, employees were described as enthusiastic and knowledgeable,
putting customers at the centre of all they do. Staff reported that they were able to spend
quality time with individuals and get to know them well, and support was found to be
provided in a timely manner. Good relationships were noted between staff and
management, with appropriate checks and audits in place for the service type.
The Trindlemoss facility was commended for being clean and well maintained, offering a
generous amount of space split into zones allowing multiple activities to take place at the
same time. The gardens were described as ‘well maintained’ and used for a number of
activities - including growing vegetables - and areas such as the training kitchen and
laundry area provide important socialisation and life skill development opportunities.
45

Page 46

28 
Out of Hours Social Work Service 
Date Period North Ayrshire  South Ayrshire East Ayrshire Total 
2020-2021 4165 2337 2800 9302
2021-2022 4000 2202 2613 8815
2022-2023 3185 1783 2366 7334
2023-2024 3832 2103 3159 9094
2024-2025 3935 2167 3353 9455 
These figures do not include the calls taken which did not result in a referral being made
to day services. 
Self-Directed Support 
Self-Directed Support (SDS): For the reporting year 2024 to 2025, the following
information indicates how people have arranged and directed their support in North
Ayrshire.
Self-Directed Support offers four options. These are:
• Option 1 – a direct payment, which is a payment to you or third party to pay
for your own support
• Option 2 – you direct the available support
• Option 3 – the local council arranges the support
• Option 4 – a mix of the above
0
50
100
150
200
250
300
350
400
Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25
AOOH Referrals
NAC SAC EAC
46

Page 47

29 
This continues to demonstrate that traditional support options are offered and accessed
most with 80% of people receiving Option 3, where little choice and control is exercised
and support is chosen, arranged and directed by the Health and Social Care Partnership.
Care at Home
Our first annual Care at Home Manager Development Day has taken place. This was
introduced as a practical support for new and existing managers to enhance both
confidence and skills, focusing on key areas such as:
1. Skill enhancement: Managers should continually develop their skills to keep up with
best practices.
2. Leadership Improvement: Effective leadership is essential for the managers to
motivate and guide their team.
3. Employee Development: Managers play a key role in the growth of their Care at
Home Teams, by improving their mentoring, coaching and feedback skills they can
better support the Carers whom they line manage. 
4. Networking: The development days enable the managers to share experiences and
learn from their peers. 
5. Wellbeing: Investing in the development of managers supports their wellbeing.
The service will continue to support future sessions, engaging in new concepts,
continuing to drive success and growth which also supports career progression. 
Care at Home Recruitment: Family Participation
Our care at home team remains dedicated to involving service users and their families in
recruitment events. Family members can drop into these events, meet the team, and
discuss the care provided to their loved ones. During these sessions, the team has
received appreciation from families for their compassionate care and efforts to address
any concerns. This feedback highlights the team's commitment to delivering high-quality,
empathetic care as well as to ensuring that families feel empowered to discuss their
concerns openly and fully. 
47

Page 48

30 
Carers
North Ayrshire Council and Carers Gateway North Ayrshire have signed up to a new UK-
wide commitment aimed at improving the lives of young carers and young adult carers,
with NAC leading the way by being the first local authority in Scotland to sign up for this
important initiative.
The Young Carers Covenant was launched by the Carers Trust and the Young Carers
Alliance, setting out a series of outcomes for
organisations to work towards to ensure the
life chances of young carers are improved. 
Caring can have a serious impact on a young
person’s education and long-term future, with
many young carers missing out on important
parts of their childhood. This means it is
vitally important that they receive the right
support at the right time to enable to them to
continue in a caring role while being a child
or young person first. 
By signing up to the Young Carers Covenant, North Ayrshire Council and its partner
Carers Gateway North Ayrshire have made the commitment to work towards ten key
outcomes that will improve life chances for young carers, ensuring they are identified at
the earliest opportunity, receive timely support, are able to thrive in education and
employment, have time for themselves, and are able to maintain good physical health
and wellbeing.
This will involve continuing to work with education services, including colleges and
universities, to ensure staff and students know who young carers are, the effects of
caring roles and how to identify and support them.  
48

Page 49

31 
2.3 Criminal Justice 
Multi Agency Public Protection Arrangements (MAPPA) 
The Multi Agency Public Protection Arrangements (MAPPA) are a set of statutory
arrangements that allow for the assessment and management of the risk posed by
people convicted of certain sexual and violent offences. In Scotland, arrangements were
established by Sections 10 and 11 of the Management of offender’s etc. Scotland act
2005 and became operational in 2007. MAPPA brings together the Police, Local
Authority Social Work Justice Services, the NHS and Prison Service. In addition, some
other agencies are under a duty to co-operate with the Responsible Authority in respect
to the arrangements. These include, local authority housing, the Reporter to the
children’s panel, certain registered social landlords and electronic monitoring providers.
The creation of an effective Risk Management Plan is the key factor in the MAPPA
process. To support staff in this critical task, on 19th and 20th of June 2024, subject
matter experts from the Risk Management Authority Scotland , provided training on the
best ways to approach this task. The training was attended by over fifty members of staff
from both the Police and Justice Services.
As a result of the training there has been an immediate improvement in the quality of the
important foundation documents produced by Justice social workers with positive
feedback received “Your Risk Management Plan was first class, comprehensively
detailing the risk factors and the plans in place to mitigate risk and throughout the
MAPPA meeting, your role in working with Mr A and the therapeutic relationship you
have with him was highlighted by every other service”.
Community Payback Orders
The latest Government statistics on Community Payback Orders (CPOs) (2023 to
2024) show that North Ayrshire had the highest of the Ayrshires with 479 CPOs which
equates to 52.5 per 10,000 population.The Scottish average is 39.1 per 10,000
population.
There has been a reduction in the number of Criminal Justice Social Work Reports
(CJSW) since 2020 to 2021 largely thought to be due to the result of COVID-19. 2024 to
2025 sees the highest number of report submissions since this downward turn, albeit not
yet at pre-covid numbers. The latest Government statistics on CJSWs for 2023 to 2024
reveal North Ayrshire to have submitted the highest number of reports of the Ayrshires.
Our Justice Services continue to have a positive impact on the local community through
the Community Payback Order (CPO) unpaid work scheme. For the twelfth year we
continue to over-achieved against targets for CPO level 1 and level 2. 2024 to 2025 saw
78 out of 79 level 1 CPO’s completing within timescales and 108 out of 112 level 2
CPO’s completing within timescales. The targets set for unpaid work are pan-Ayrshire
targets.
49

Page 50

32 
Drug Treatment and Testing Order 
There was a marked increase in in Drug Treatment and Testing Order (DTTO)
Assessment and Impositions in 2023 to 2024. There has been a slight decrease in 2024
to 2025; however, the volume of assessments and new Orders this year remains high.
The last two years figures appear to represent a return to ‘the norm’ following a ‘dip’
attributed to covid. 
Of the 63 assessments completed in 2024 to 2025, 45 new DTTO’s were imposed
across Ayrshire. This incorporates Orders from both Kilmarnock and Ayr Sheriff Courts.
DTTO is an intense Order which involves monthly Court reviews, twice weekly contact for
the first month and weekly oral drug screens. There are three distinct roles within the
team delivering the service and interventions. The Supervising Officer oversees the
Order, monitors compliance and compiles the assessment and review reports. The
Additions Worker delivers the therapeutic interventions and is primarily responsible for
administering the oral drug screens. There are then Recovery Development Workers
who provide practical supports, assistance with welfare needs and also build links and
connections within the recovery community to help build the persons own recovery
capital.
A Recovery Care Plan is created with each individual. There are ten domains, including
substance use, relationships and offending, which are scored from 1 to 10. These plans
are updated at three monthly intervals and allows areas for support/intervention to be
identified and progress to be monitored.
50

Page 51

33 
Diversion from Prosecution
Diversion from Prosecution (Diversion) has been available since 1997, within this
past year we have experienced a further increase across Ayrshire in assessment
referrals from the Procurator Fiscal. Referrals have increased at a significant rate from
2018. Although this disposal is early intervention and low-level offending, the presenting
need of service users is extremely high, thus resulting in more staff time being allocated
and closer partnership working with other agencies to provide identified services. 
The number of assessment reports submitted are relatively lower than the number
requested due to limited resources, which has resulted in waiting lists within each local
authority area. 
In comparison with last year, 2023 to 2024 notes a decrease in the number of Diversion
cases imposed. This is due to delays from the time that the offence was committed until
the individual is referred to and assessed by the Diversion team. In this time many
positive changes could have taken place and individuals are actively seeking and
engaging with services to address any issues which they may have, thus reducing their
risk of further offending. In these instances, no interventions are required due to positive
reasons. 
51

Page 52

34 
Case Study: Employability Mentors
Employment can contribute significantly towards desistance and the development
of a pro-social lifestyle for service users involved in the Justice system. People
released from prison without a job are twice as likely to re-offend as those
released with employment opportunities lined up.
People with convictions may also face stigma and inequality associated with
declaring a criminal record, or an unwillingness by some employers to provide
those with criminal convictions with job opportunities. The Employability Mentors
located within our Unpaid Work team assist service users involved with the Justice
system to obtain skills that will enable them to gain employment and training
opportunities to support reintegration into the community.
The impact of the work of our Employability Mentors is reflected in J’s story.
J's Story
This is the story of J, who overcame significant personal and professional
challenges to rebuild his life. J's journey from a tumultuous background to a
promising future is a testament to resilience, support, and determination.
Following a court order that mandated 18 months of social work supervision and
180 hours of unpaid work, his life took a difficult turn. This period marked the
beginning of numerous challenges, including poor physical and mental health,
which necessitated additional support from various departments, including
addiction services.
Employment History
J had a career in His Majesty's Armed Forces but was discharged due to physical
and mental health issues. During this time, he picked up charges before
transitioning to roles in security and as a bus driver. However, J’s health issues
impacted on his ability to sustain employment. J was referred by his Community
Payback Officer (CPO) to the Employability Mentor service to help him reassess
and explore his employability options.
The Employability Mentor Service is a dedicated one-to-one service for individuals
who are involved with Justice Service to identify further education, training,
volunteering and employment. By tackling the additional barriers service users
face, by being involved with the Justice Service, the employability mentors are
able to realistically provide support to reach long lasting positive destinations.
The CPO Employability Mentor Service offers people information, advice and
guidance on disclosure related issues. This includes helping people understand
their rights when disclosing an offence, how restrictions can affect their job hunting
or how to reskill into a new career.
The Challenge
Due to his offence, J was forced to reskill and seek new employment
opportunities. His physical and mental health further complicated his ability to find
52

Page 53

35 
and maintain stable employment. Despite these setbacks, J was determined to
improve his situation and with the support of the Employability Mentor sought a
new career path, enrolling in courses through the Open University and other
training programs.
Financial Assistance
Addressing financial barriers was crucial. Assistance with fuel costs, support from
Money Matters and access to food banks provided J with stability and a
foundation to start anew.
Health and Wellbeing
Continuous support from health services helped improve J's physical and mental
health, enabling him to focus on his future.
Achievements and Progress
While pursuing his studies and with ongoing intervention from the Employability
Mentor J actively searched for employment and secured a part-time job as a bus
driver. This role not only provided financial stability but also boosted his
confidence and well-being. With his health improving and life stabilizing, J is now
on a more promising path. As his situation improves, J is more motivated and has
started studying IT.
Conclusion
J's story is a powerful example of how targeted support and personal
determination can overcome even the most daunting challenges. J’s s progress in
both his job and health highlights the importance of comprehensive joined up
support systems in facilitating successful rehabilitation and career transitions.
It also evidence that access to employment with a criminal history is still possible. 
53

Page 54

36 
Key Performance Indicators
MHO Service
Mental Health (Care and
Treatments) 2003 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Emergency Detentions 54 54 81 96 92 99 121 
Short Term Detentions 74 67 134
There has
been a total
of 171
requests (of
which
consent
was given
to 134, with
the other
37 being
assessed
but consent
not given)
There has
been a total
of 127
requests (of
which
consent
was given
to 108, with
the other
19 being
assessed
but consent
not given) 
There has
been a total
of 182
requests (of
which
consent
was given
to 151, with
the other
31 being
assessed
and
consent not
given)  
There has
been a total
of 202
requests (of
which
consent
was given
to 170, with
the other
32 being
assessed
and
consent not
given)
54

Page 55

37 
Compulsory Treatment 38 51 59
There has
been a total
of 70 new
CTOs
granted (of
which 27
had been
Interim
CTOs, with
14 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal)
There has
been a total
of 60 new
CTOs
granted (of
which 17
had been
Interim
CTOs, with
12 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal)
There has
been a total
of 47 new
CTOs
granted (of
which 10
had been
Interim
CTOs, with
4 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal) 
There has
been a total
of 60 new
CTOs
granted (of
which 24
had been
Interim
CTOs, with
18 of these
moving to
full CTO
following a
further
Mental
Health
Tribunal) 
Warrants Undertaken 1 6 6 4 4 3 2 
Criminal Justice Act Scotland 1995 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Compulsion Order and Restriction Order 4 3 3 2 0 0 0
Compulsion Orders 2 6 6 3 3 3  6 
Hospital Directions 1 1 1 0 0 0 0
Assessment Orders 2 2 2 6 5 6  4 
Treatment Orders 4 2 2 6 2 3  4 
Transfer for Treatment  2 1 3 1 1 1  1 
55

Page 56

38 
Adults with Incapacity Act (Scotland) 2000 2018–19 2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
Private Welfare Guardianships 411 (58
new)
272 (67
new)
314 (57
new)
402 (102
new)
371 (99
new) 
422 (125
new)
450 (63
new) 
CSWO Guardianships  40 (16
new) 64 (24) 71 (24) 91 (26) 85 (27
new)
121 (54
new)
151 (40
new) 
Financial Intervention Order (LAG) 26 31 n/a  n/a  n/a  n/a n/a 
MHO Report PWG Application  38 104 75 156 139 141  101 
Adult Protection  
2019–20 2020–21 2021-22 2022-23 2023-24 2024-25
ASP Referrals (AP1) 568 558 643 722 915 1092
ASP Investigations (AP2) 108 132 102 72 112 100
ASP Case Conferences  66 64 40 41 57 43
Protection Orders 0 3 1 0 1 0
Adult Concern Reports  2335 2215 2070 2370 2103 2538
56

Page 57

39 
3. Resources 
3.1 Financial Pressures 
The IJB set a balanced budget for 2024/25 on 14th March 2024. This did not require any
draw on reserves but did include the approval of £10.290m of savings to achieve financial
balance.
Financial information is part of the performance management framework with regular
reporting of financial performance to the IJB. This included an integrated approach to
financial monitoring, reporting on progress with savings delivery, financial risks and any
variations and changes to the delegated budget. 
Financial balance was not been achieved in 2024-25 and the 2025-26 budget highlights
several areas of significant risk. Financial modelling also anticipates a very challenging
position in subsequent years. 
From the initial budget monitoring report in month 3 the projected position was an
overspend. The Integration Scheme requires the preparation of a recovery plan if an
overspend position is being projected to plan to bring overall service delivery back into
line with the available resource. The IJB agreed some initial recovery actions at the
meeting in June 2024 and a more detailed financial recovery plan was developed and
approved by the August 2024 IJB.
Since the initial recovery plan was agreed in June 2024 there was a £4.002m reduction in
costs.
Despite this, against the full-year budget of £326.629m there is a reported overspend of
£1.212m pre-earmarking. After earmarking the overspend of £3.593m consists of an
overspend of £2.036m in social care services and an overspend of £1.557m in health
services. Following additional funding contributions this position was brought on-line.
There were significant financial challenges during the period. The main challenges during
the year were residential placements for children, care at home, supplementary staff in
wards and Unplanned Activities (UnPACs) within the lead partnership for mental health.
3.1  2025-26 Budget
As part of the Scottish Government budget and finance settlement funding letters were
issued to NHS Boards and Councils, these detailed the requirements in relation to the
level of funding to be delegated to IJBs in 2025-26.
The specific requirements and funding provision is as follows:
NHS Ayrshire and Arran
• NHS Ayrshire and Arran are required to passport the 3% through to IJBs
(£4.040m to North Ayrshire) – “In 2025-26, NHS payments to Integration
Authorities (IA) for delegated health functions must pass on an uplift of 3% over
2024-25 agreed recurring budgets.” 
57

Page 58

40 
• Additionally, there is funding of £150m nationally for Agenda for Change Pay
Reform. A share of this funding will be allocated to the IJB to meet the associated
costs for NHS staff. This is being followed to ensure the correct roll-forward into
2025-26 and it is anticipated at this stage that the costs of the pay reform will be
fully funded. 
• Moving into 2025-26, brokerage will no longer be available to NHS Boards and all
Boards must work towards break-even. Should financial balance not be achieved
this would be shown as an overspend in financial statements, leading to potential
qualification of accounts and Section 22 report, as well as consideration of
escalation status.
• The NHS budget includes a commitment of additional funding to reduce waiting
lists and to help support reduction of delayed discharge; as well as a commitment
to renew primary care enhancements, including new core funding to GMS to
deliver enhanced frailty, cardiovascular disease and other essential services in
General Practice, a critical dental workforce and training package and a
community eye care programme to transfer patients from waiting lists. Further
details of the allocation of funding is to follow but a submission from NHS AA
incorporates the request for funding from North Ayrshire IJB and this was
submitted to the Scottish Government early March 2025.
• Similarly to Local Government NHS Boards have also been advised to plan on the
assumption of 60% funding for the Employers National Insurance Increase.
North Ayrshire Council 
• Based on the 2025-26 Finance Settlement the Health and Social Care Portfolio
will transfer additional funding of £140 million to Local Government to support
social care and integration for 2025-26.
• The funding allocated to Integration Authorities should be additional and not
substitutional to each Council’s 2024-25 recurring budgets for services delegated
to IAs and therefore, Local Authority social care budgets for allocation to IAs must
be at least £140 million greater than 2024-25 recurring budgets.
• The increase in Employers National Insurance from April 2025 has not been fully
funded for the public sector in Scotland and has created a significant financial
pressure. For Local Government funding of around 60% of the cost will be
provided by Scottish Government for directly employed staff. There is zero funding
being provided for any commissioned services.
• Specific funding for the IJB was received for the following areas:
• Real Living Wage   
• Free Personal and Nursing Care 
58

Page 59

41 
• Additionally, North Ayrshire Council have passed through a share of the Local
Government Grant uplift of £2.114m and have fully funded the increase in
Employers’ NI costs of £1.898m for NAC contracted staff. previous years and were
already assumed in the Partnership base budget and this is shown in the table
below.
Moving into 2025-26 the Partnership is proactively working to provide safe and effective
services for the residents of North Ayrshire within the financial envelope, this is
supported by approving a balanced budget. The IJB approved a one-year balanced
budget for 2025-26 on 20 March 2025. More information about the budget can be found
here - 25-26 Budget
This budget included new budget pressures for health and social care services totalling
£14.943m. These were developed in partnership, with Finance supporting front line
services to identify current and emerging financial pressures considering historic demand
and costs and potential future variations. The provision of funding for pressures has the
impact of increasing the budget gap to be addressed through savings, therefore the
pressures are only included in budget plans where these are absolutely unavoidable.
The new cost and demand pressures resulted in a requirement to identify and approve
additional savings of £4.019m
3.3 Financial Planning
Strong financial planning and management is paramount to ensure our limited resources
are targeted to maximise the contribution to our objectives. Delivery of services in the
same way is not financially sustainable. The updated strategic plan approved for 2022-30
is underpinned by the need to learn from the pandemic and ensure opportunities are
maximised to transform care models and find new solutions to ensure the future
sustainability of high-quality heath and care services. 
The ability to plan based on the totality of resources across the health and care system to
meet the needs of local people is one of the hallmarks of integrated care. Medium term
financial planning is key to supporting this process and identifying the transformation and
planned shift in resources to provide sustainable services to the local community over the
medium term. 
The IJB has a strong reputation in delivering savings. The IJB will continue to pursue
transformational change in how it supports individuals, families and communities to live
independently from statutory services for as long as they can safely do so. This is not just
about changing the ways in which services are structured but will require a change in
how they are planned and delivered.
Our health and social care services should reflect and respond to the needs of local
people. To support this, we will help to build greater capacity in our communities and
provide more ways for service users and local people to share their views with us to help
shape services. We are fully committed to planning and designing services together with
local people, our staff and our key partners including acute health services, housing,
community planning and the third and independent sectors.
59

Page 60

42 
The IJB, through the Strategic Plan, outlines the belief that together we can transform
health and social care services to achieve the joint vision for the future “all people who
live in North Ayrshire are able to have a safe, healthy and active life.” Moving into 2025-
26, we are working proactively to address the financial challenges, while at the same
time, providing high-quality and sustainable health and social care services for the
communities in North Ayrshire.
3.4 Medium Term Financial Outlook 
A Medium-Term Financial Outlook (MTFO) is a critical part of the strategic planning
process. The financial context for public services remains very challenging and so it is
vital that the IJB’s strategic ambitions are set against the financial resources which are
anticipated to be available.
The MTFO provides key information on the possible financial position of the IJB over
future years. It identifies the financial challenges which will be faced by the IJB enabling
the IJB to see the impact of current and future decisions on its medium-term financial
health.
The MTFO will also be used to identify pressure points and inform decisions which are
required to ensure the Partnership remains financially sustainable.
There are a range of factors which influence the financial planning of the IJB. These are
considered through the MTFO and include the following:
• Demographic changes.
• Local priorities.
• Workforce challenges.
• The UK and Scottish Economy.
• Policy and Legislation.
• Cost and demand pressures.
• Available funding. 
As in previous years, a Medium-Term Financial Outlook has been prepared to identify
what the financial position may look like moving into 2026-27 and 2027-28.
The Integration Joint Board, in common with most Public Sector bodies, is facing a period
of significant financial challenge with cost and demand pressures. The most significant
financial pressures continue to be pay awards for staff, inflationary cost increases for
contracted services and demographic changes driving increased demand for services -
funding these unavoidable pressures year-on-year drives our savings requirement.
There are a number of highlighted financial risk areas that may impact on the 2025-26
budget during the year, these include:
60

Page 61

43 
These risks will be monitored during 2025-26 and the financial impact reported to the IJB.
The next three years will be the greatest financial challenge that the IJB has been asked
to manage since its inception. North Ayrshire IJB is clear about the challenges which are
ahead and its aspirations for its services, however we will also need to be realistic about
what can be delivered within the funding envelope available. Transformation alone will
not address the financial gap, and this will require the IJB to prioritise decisions for
investment and disinvestment in order to support delivery of the Strategic Plan. This will
result in some services being reduced or stopped altogether but this action is required to
ensure the available resource reaches those most at risk and in need of care and
support.  
Legacy Overspends Growing demand for
services
Provider market – cost
pressures and potential
market failure
Performance
expectations – Maintain
and Improve
SG Policy Commitments
not fully funded &
funding reducing or
ceasing
Wider system financial
challenges – NAC and
NHS
Meeting needs of
population – with rising
costs of care
NHS Reform priorities Zero Unearmarked
reserves
61

Page 62

44 
4. Workforce 
4.1 Workforce Planning
Following the implementation of the HSCP “Be the Best You Can Be” Learning &
Development Strategy (Social Work and Social Care) in September 2023 there has been
a clear indicator of the HSCP organisational offer and expectations in relation to
professional development for the social work and social care workforce. While the
strategy enters its third year it continues to outline our approach to articulating to our
practitioners how much we are investing in their development and aims to embed the
development of leadership and management capabilities. 
The issues in relation to professional staff sufficiency remain across all areas of social
work both locally and nationally.  The recent SSSC Annual Workforce Data Report shows
there was an increase of 23% in the social work workforce in NAHSCP. This is testament
to the implementation of the “Be the Best You can Be” Learning and development
Strategy 2023/28 which outlines the qualification pathways and annual development
offers to staff.
We can continue to offer annual sponsorship opportunities for the Undergraduate Social
Work Degree and “fast track” routes including the Post Graduate Diploma in Social work.
As a direct result of the “Growing Our Own” programme we have 9 employees
undertaking a social Work qualification and a further 4 employees who have completed a
social work qualification and will graduate in the autumn. This programme has seen 12
employees qualify as social workers.
To further support the “Growing Our Own” programme we have embarked on the journey
to create a NAHSCP Practice Education qualification through SQA and SSSC approval
processes this will ensure a sustainable, local and self-sufficient delivery method of the
qualification which will secure the pathway for development and social work students in
NAHSCP.
As part of the strategy and the Growing Our Own programme there is a visual pathway
which demonstrates from school leavers to senior levels what is on offer including the
opportunity to undertake an HNC in Social Services & Healthcare and 12 employees
were successful in the completion of this qualification earlier in the year and a further
offer has been disseminated to staff.
We are continuing to develop robust relationships and ways of working with Universities
in the West and the local Ayrshire College. Through these more direct ways of working
and collaboration we continue to explore the variety of degree level, post graduate and
post qualifications on offer and practice learning opportunities is one of our optimum
responsibilities.
Through such collaborations we have developed in partnership with Ayrshire Hospice an
enhanced approach to the quality of palliative care through comprehensive training
opportunities. This will support the increased number of citizens who choose to remain at
home in the final stages of life rather than in a clinical setting and equip social work and
social care staff with the knowledge and skills to provide compassionate care.
62

Page 63

45 
Our commitment to the provision of Mental Health Officers within the organisation is
another key component of the Learning & Development Strategy. Following the “pilot”
delivery of the mental health qualification from a different HEI where the aim was to offer
a more bespoke and flexible qualification with a local context we have 2 employees
nearing successful completion of this qualification and a further 2 sponsored on this
course for the next cohort.
The strategy seeks to strengthen the newly qualified first year for Social Workers in
cognisance of the directive from the implementation of SSSC Newly Qualified Workers
Supported Year. This is critical as the first year greatly influences professional autonomy
and authority which are key to good social work practice. With the introduction of
mentoring training and support for teams who will have NQSW’s and an offer to extend
our support to NQSW’s from 12 months to 18 months with a monthly planned programme
delivered by the social work practice team this will nourish new social workers. This
approach continues to be embedded after the initial implementation year and feedback
from a “deep dive” quality assurance exercise carried out by the SSSC highlighted
instances of “exceptional” examples of practice from our NQSW’s.
Leadership & Role Modelling has been seen as one of the key areas where managers
and supervisors can influence professional standards and practice and promote a
leadership culture. With Aspiring Leaders Programmes for aspiring/new managers and
Systems Management Programmes for senior managers these programmes offer
reflective space and coaching to allow practitioners to explore complex systems and
leadership at all levels within an organisation. Both courses have been delivered and
continue to demonstrate extremely successful outcomes in the development of a cross
section of practitioners. 
In relation to the key area of Good reflective Supervision outlined in the document
“Supervision Standards” have been developed following the ongoing work in relation to
supervision practice being undertaken by external consultant Bridget Rothwell. The
standards are contained in the “Be The Best You Can Be” Learning and Development
Strategy. The Supervision Standards outline expectations in relation to good reflective
supervision, values and conduct which can be used to develop bespoke service specific
supervision guidance and there is clear guidance around expectations and usefulness of
face to supervision provision. The strategy includes an overarching focus on the
wellbeing of the workforce and is included as a key component of the supervision
standards. Further input from Bridget will commence in the summer and will focus on
bespoke development support for frontline managers.
In relation to ongoing in house training we have been able to increase the number of
courses on offer by more than 100%. The variation of courses on offer has increased
following consultation with the workforce and driven by other national agendas including
Trauma Informed Practice. This has resulted in 417 practitioners attend the various offers
of Trauma Training since it was launched 9 months ago and a further 11 completing the
Professional Development Award which is an accredited qualification.
Our offer to the workforce for accredited qualifications has increased significantly with a
variety of Professional Development Awards including, Mental Health, Leadership and
Management and Supervision available. These offers enhance the knowledge and skill of
the workforce in both social work and social care and contributes the mandatory
requirements outlined by our regulatory bodies.
63

Page 64

46 
As the strategy continues to be embedded the “appetite” for development from the
workforce is evident with the participation at events and information sessions.
4.2 Workforce Support and Development 
As platinum award winners in Investors in People, the Dirrans team were looking for
a different challenge so went forward for a new award from Investors in people ‘We
invest in wellbeing.’ The We invest in wellbeing framework looks for a strategy and
approach to the health and wellbeing of staff. This should be measurable and understand
the impact of this on staff practice. The team considered and improved practice by
evaluating staff wellbeing through surveys and feedback. They created a wellbeing policy
and strategy to guide wellbeing goals such as reducing sickness absence, improving job
satisfaction and job retention. They also developed subgroups that focussed on physical,
psychological, social and financial factors that can affect staff and shared this as a team
to be more informed about what supports staff can access to help improve wellbeing. 
The team reflected that they already felt that they had a strong presence for looking after
staff however going through this process it highlighted areas for improvement and how
the framework could improve the
service. The We invest in Wellbeing
framework comprises three indicators,
each with three themes. This defines
what it takes to reach each level of
accreditation standard, silver, gold,
and platinum.
It was intended to start at the first level
of ‘standard’ however when receiving
feedback, this had jumped to silver
which is an amazing achievement, and
the Dirrans Centre were confirmed
winners of the silver award in August
2024.
We invest in wellbeing silver award
means that you have an established
wellbeing strategy or plan and that
your people feel positive about your strategy, plans and activities. Developing and
supporting our workforce ensures employees are more efficient and effective in their
roles, helps retain our skilled and qualified staffing resources, and improves morale and
job satisfaction.
The Health and Social Care Partnership are delighted to advise the launch of a formal
model of support for workers in the creation of a Staff Vicarious Trauma Service. The
Partnership recognises the secondary trauma, stress and burn out, which can occur
when working in a complex human environment with many moving parts. The purpose of
the venture is to support staff who are working within the live space, exposed to
complicated human contexts. 
The service will be delivered by Breaking The Silence, who have significant experience
and knowledge in this field and beyond, supporting victims of profound and vicarious
64

Page 65

47 
trauma. Staff will be able to access therapeutic support to work through the vicarious
trauma they have been exposed to. This will provide a safe space to process their
experiences, gain therapeutic insights/supports and build on their resilience to move
forward. Incorporating coping strategies, wellbeing plans with the purpose of helping staff
to continue work responsibilities without any detriment to their mental, emotional and
physical health and wellbeing, protecting them from, and reducing the risk of vicarious
trauma. 
The contract will also provide two wider workforce training days each year for
approximately 80 staff in total. The aim is to raise awareness of vicarious trauma per se -
including learning, development, preventative/promoting self-care responses, sharing
experiences and practice-based learning. Overall, the service aims to support staff’s
wellbeing, offer protection from the exposure of traumatic human experiences, while
building staff resilience and minimising disruption to the overall service through improved
sickness absence and higher staff retention rates. 
Case Study: Community Nursing
Connie, Newly Qualified Nurse (NQN), Garnock Valley and Kilwinning Community Nurse
Team
I was assigned to the Garnock Valley (GV) District Nurse team as a year 3 student on my
management placement. During this placement when the NQN recruitment process
commenced one of the Staff Nurses had indicated she was going to retire. I was keen to
work in community nursing and made this speciality my first choice on my application
form.
During my placement I was able to take on a small, delegated caseload and was able to
plan and assess the care for my patients with support from my Practice Supervisor and
also from the other staff in the team. This experience gave me confidence in what I would
expect as a Staff Nurse if successful at interview. 
All students in my cohort were offered interviews and I attended and I was delighted to
be informed I was the preferred candidate for the GV post. In the remainder of my
placement, I ensured I was exposed to as much of the community staff nurse role and
responsibilities as possible. I joined the team in September as a Band 4 Health care
Support Worker while my Nursing and Midwifery Council (NMC) pin was processed
which came through early October and I transitioned to a Registered Nurse. Working as
a NQN is a daunting experience for any individual, however I have only ever felt fully
supported and valued. Ongoing induction and mentorship to the role from both the wider
District Nurse team and participating in the NQN induction/education sessions has been
beneficial to my journey and it also allows me to discuss the NQN pathway with my peers
in other specialities and department. Although I’m a Staff nurse within the team I have
access to every part of the wider Health and Social Care partnership team in providing
high standard of care for our patients and their families.
65

Page 66

48 
The winners of the 2024 Partnership
Awards were announced at our
‘Promoting Wellbeing Together’ event at
the Redburn Community Centre in Irvine. 
The event was a fantastic celebration of
the staff, teams and individuals who
deliver health and social care services in
North Ayrshire, as well as the crucial work
of those in our communities who support
people with their wellbeing, including
volunteers, community organisations and
charities.
All employees of NAHSCP and our providers can now enjoy a year’s free access to
Holly Health, a fantastic mobile app that can support you to make small, achievable
changes that could help boost your health and wellbeing. 
Using a compassionate, personalised approach tailored to your own health goals,
interests and activities, the app can help you to reduce stress and anxiety, rebuild your
relationship with food, increase exercise and movement and improve your sleep.
Holly Health will assist you in making small but consistent changes to your daily
behaviours, helping you build healthier habits, promoting mindfulness and encouraging
you to be more kind to yourself.
In-app coaching is available through a supportive chat bot system, with friendly,
motivational reminders by text or email to keep you on the right track. The app also
contains a wealth of useful articles and videos that you can browse at your leisure.
Funded by NAHSCP, you’ll initially enjoy six months’ free access to the app, before being
invited to a further six-month subscription for free once that expires.
“I feel I have lessened how often I see my GP”
“This is a great idea and honestly feel this could help so many people if this is what
doctors are able to prescribe! A year’s free subscription to a brilliant self-help app, with
no restrictions and no judgement. This has been a godsend during a tough time.“
“The app is a great resource for reliably keeping on track with habits that are healthy and
productive. It is also very generous to allow us to have access to this app for the time
being. It is appreciated.“
The LiveWell group have partnered with KA leisure to bring free health checks to
Council employees. The KA Leisure health check sessions include lifestyle and weight
management advice along with cholesterol, blood pressure, blood sugar testing and the
Boditrax machine – a clever system that assesses your body and, very quickly, delivers
14 different measurements, such as your ideal weight, your BMI and your metabolic age.
66

Page 67

49 
Our Chief Executive Craig Hatton booked in to one of the health check sessions and
encouraged others to do the same. He said: “It’s been brilliant having the opportunity to
have my recent employee health
check, thanks to the LiveWell group
and our partners at KA Leisure.
I think it’s important that colleagues
understand just how vital it is to take
time for their own health and learn
about what they can do proactively to
improve it. The reason I booked in to a
recent KA Leisure health check was
because I am mindful that I’m not
getting any younger and I knew – for
my own peace of mind – that making
time to have the check done was going
to be beneficial for me.” 
67

Page 68

50 
Independent Care Providers who provide care services on our behalf 
Where we commission care and support from independent and 3rd sector Providers services based within the North Ayrshire area,
we monitor these services via the Contract Management Framework. The Framework focusses on ensuring a joint approach to
evaluating the quality of care and where appropriate provides an approach to supporting Providers to progress improvements. We
use a range of methods to monitor performance, including: 
• Formal Contract Management meetings on a 6 monthly basis and an Annual Joint Evaluation of Contract to ensure that services
are safe, effective and most of all, that they meet people’s needs
• Review of compliments, complaints and feedback from staff, carers and people who use services
• Information that we collect, before visits, from the provider or from our records
• Local and national information, for example, Care Inspectorate reports
• Visits to providers, including observing care and support and looking at records and documents 
The information below represents how those service which are registered with Care Inspectorate and are based in North Ayrshire
are currently performing.
Registered Services – Minimum Grades across all themes
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Adult Placement Service Not applicable 0 1 0 0 0 1
Care Home Service Older People 0 7 3 1 0 11
Care Home Service Children & Young
People 0 2 0 1 0 3
Care Home Service Learning Disabilities 0 1 2 0 0 3
68

Page 69

51 
Care Service Subtype
2
Weak
3
Adequate
4
Good
5
Very Good
6
Excellent
Grand
Total
Care Home Service Mental Health
Problems 0 0 1 0 0 1
Child Minding Not applicable 0 4 5 0 0 9
Day Care of Children Not applicable 0 6 7 2 0 15
Housing Support Service Not applicable 0 0 3 3 0 6
School Care
Accommodation Service Not applicable 1 0 0 2 1 4
Support Service Care at Home 1 1 4 2 0 8
Support Service Other than Care at
home 0 0 1 0 0 1
Grand Total Not applicable 2 22 26 11 1 62 
69

Page 70

52 
Inspection of Local Services   
Throughout 2024 to 2025, a total of ten inspections took place by the Care
Inspectorate, eight were unannounced. 
• Health & Community Care - 2 inspections.
• Children & Families & Justice Services - 6 inspections.
• Adult Services - 2 inspections. 
The Care Inspectorate use a six-point scale to grade inspections:
1 Unsatisfactory Major weaknesses – urgent remedial action required
2 Weak   Important weaknesses – priority action required
3 Adequate  Strengths just outweigh weaknesses
4 Good   Important strengths, with some areas for improvement
5 Very Good  Major strengths
6 Excellent  Outstanding or sector leading 
Gradings for inspections can be found below. Inspection reports can be found on the
Care Inspectorate website - Inspection Reports. 
70

Page 71

53 
Inspection Date Service/Unit Wellbeing Leadership Staffing Environment Care &
Support
04 - June – 24 The Meadows 3 0 0 0 0
20 - June – 24 Montrose House 3 3 3 4 3
12- August - 24 Canmore 3 0 0 0 0
22 - October - 24 Trindlemoss Day
Opportunities 5 5 5 5 4
31 - October – 24 Montrose House 4 4 0 0 0
05 - November – 24 Supported Carers
Scheme 5 3 3 0 3
16 - January - 25 Trindlemoss
House 4 4 4 3 5
03 - March - 25 Adoption 5 3 0 0 4
26 - March - 25 Achnamara 3 0 0 0 0
28 - March - 25 Fostering 4 3 0 0 4 
71

Page 72

72

Page 73

NORTH AYRSHIRE COUNCIL 
30th September 2025 
Cabinet
Title: Integration Joint Board Financial Position
Purpose: To provide Cabinet with an update on the financial position of
the IJB.
Recommendation: That Cabinet notes the financial position of the IJB and the
action being taken to manage the overspend position. 
1. Executive Summary 
1.1 For financial year 2024-25 the IJB final outturn position was an overspend of
£3.593m (£2.036m Social Care and £1.557m Health).  This required both North
Ayrshire Council and NHS Ayrshire and Arran to provide additional non-recurring in-
year funding. 
1.2 The IJB reported a budget gap for 2025-26 of £3.069m and set a balanced budget
in March 2025 with savings of £4.019m approved, in recognition of legacy
overspends during the previous financial year which would require to be addressed. 
1.3 The IJB continues to face a significant financial challenge and for 2025-26 is
currently projecting a year-end overspend position of £5.187m (as at Month 3).  A
financial recovery plan has been developed in line with the requirements of the
Integration Scheme and full delivery of this would improve the position to an
overspend of £1.175m (£0.656m Social Care and £0.519m Health). 
1.4 There remain further financial risks to the financial position as this is adversely
impacted by the factors out-with the direct control of the IJB including in-year
reductions in funding, externally agreed contract and pay inflation and significant
demand pressures on services. The financial challenges have implications for the
delivery of the Council’s social work duties. 
1.5 The IJB 2024-25 Annual Audit Report produced by Audit Scotland sets out concerns
that the IJBs cost base is not sustainable with current funding levels and savings
from transformation not able to cover estimated costs, and highlights the risks
associated with the IJB now holding no uncommitted reserves balance which limits
the ability to manage and mitigate future financial pressures and represents a
significant financial risk to both the IJB and its partners.  
Agenda Item 4
73

Page 74

1.6 The national position for IJBs across Scotland remains challenging with a
deteriorating financial position being reported across most and with concerns being
raised by the Accounts Commission in relation to Financial Sustainability. Chief
Officers have raised these concerns through national networks and with COSLA to
seek to influence future funding decisions, particularly to recognise the acute
financial challenges in the delivery of social care services.   
2. Background 
2024-25 Final Outturn Position 
2.1 Against the full-year budget of £326.629m there was an overspend of £1.212m pre-
earmarking of ring-fenced Scottish Government funding allocations.  After
earmarking the overspend of £3.593m consisted of an overspend of £2.036m in
social care services and an overspend of £1.557m in health services. There were
no unearmarked reserves to contribute to the overspend. 
2.2 There was a financial recovery plan in place during 2024-25 and significant progress
was made to contain costs, this delivered a £4m improvement, but the full benefits
were not fully attributed to the bottom line as other in-year pressures impacted on
the overall position.  Projecting the IJB financial position during the year continued
to be difficult as there were a number of areas of uncertainty throughout the year
including externally approved contract inflation in-year, pay awards and the NHS
Agenda for Change reduced working week. Social care service provision in
particular is difficult to project, with variability due to capacity and demand and can
move significantly with low volume/high-cost packages of care. 
The graph below illustrates the movement in the financial outturn throughout the
year: 
2.3 The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
74

Page 75

funds.  Following additional funding contributions this position was brought on-line.     
2.4 The main areas of pressure were residential placements for children, care at home,
residential care home placements for adults, agency staff costs at Montrose House,
use of supplementary staff across community wards, and unplanned activities
(UNPACS) within the lead partnership for mental health. Many of these underlying
areas of overspend are recurring costs and therefore continue into 2025-26. 
2025-26 Revenue Budget 
2.5 The IJB, like the Council, is required to set a balanced budget and met in March
2025 to formally agree the budget for 2025-26. Additional cost pressures of
£14.943m were identified and, partly supported by additional funding of £11.874m,
savings of £4.019m were approved by the IJB to achieve balance and contribute
£0.950m towards mitigating pressures carried forward from 2024-25. 
2.6 The Council funding included a passthrough of funding for Scottish Government
policies, 100% funding of the Employer’s National Insurance increase and
£2.114m of additional funds from the share of the Council’s general revenue grant
increase.  The Health Board provided a 3% NRAC uplift passthrough in line with
the Scottish Government directive applied to core/recurring baseline budgets and
a 60% contribution to the Employer’s National Insurance increase. 
2.7 The majority of the savings which were approved as part of the 2025-26 budget
are on track to be delivered. 
2025-26 Projected Outturn 
2.8 The finance team within the Health and Social Care Partnership carry out regular
budget monitoring in conjunction with Heads of Service and their Senior
Management Teams, and update reports are provided to the IJB on 6 occasions
during each financial year and a final year end report. 
2.9 The first financial monitoring report for 2025-26 was based on information at
Month 3 (June) for both social care and health expenditure, and this was
presented to the IJB in August 2025. The report noted a projected overspend of
£5.187m, the table below illustrates the split between Health and Social Care
services and the residual risk following the approval alongside of a Financial
Recovery Plan. 
75

Page 76

TOTAL
£m 
Health
(NHSAA)
£m
Social Care
(NAC)
£m
Projected Overspend  5.187 2.271 2.916
Financial Recovery Plan (4.012) (1.752) (2.260)
Residual Risk 1.175 0.519 0.656 
2.10 Where a projected overspend is identified, the IJB is required to agree a financial
recovery plan.   The full financial recovery plan is part of the IJB financial report. 
The cost reduction targets include: 
• A reduction in children’s residential placements
• A reduction in the number of older people’s care home placements
• Maintaining the current level of service provision for adults with disabilities 
• Reducing capacity in the Care at Home service
• Reduced usage of supplementary staffing in community rehabilitation and
mental health wards 
• Additional vacancy turnover including further delays to recruitment timescales 
• Pursuing full funding from NHS AA for the Agenda for Change reduced
working week impact   
The recovery plan also reflects the use of all remaining earmarked reserves which
has released some funding to support the in-year position. 
2.11 The IJB has not approved a Financial Recovery Plan which meets the full projected
overspend and there remains a significant risk of a year-end actual overspend
position. It is challenging to identify short term opportunities to improve the financial
position against the performance expectations for services, the increase in demand
for social care supports across all client groups, the inflationary impact on the cost
of care including pay and the majority of the delegated budget being committed to
front line care delivery, either through staff costs or commissioned providers. The
IJB has limited discretionary spend areas and limited scope to generate income or
stop services. These challenges are alongside a significant number of financially
high-risk areas including continued uncertainty over funding, through late notification
and in-year changes to Scottish Government funding. 
2.12 Any remaining overspend will have a financial impact on the Council and NHS
Ayrshire and Arran. The Integration Scheme sets out at paragraph 8.2.1 that: 
“The Chief Officer will deliver the Outcomes within the total delegated resources
(paid and Set Aside) and where there is a forecast overspend against an element of
the operational budget, the Chief Officer, the Chief Finance Officer of the Integration
Joint Board and the appropriate finance officers of the Parties must agree a
recovery plan to balance the overspending budget, which recovery plan shall be
subject to the approval of the Integration Joint Board. If the recovery plan is not
successful the Parties will consider making interim funds available based on the
agreed percentage contribution for joint responsibilities, as outlined above, with
repayment in future years on the basis of a revised recovery plan agreed by the
Parties and Integration Joint Board. If the revised plan cannot be agreed by the
76

Page 77

Parties or is not approved by the Integration Joint Board, the dispute resolution
mechanism in clause 14 hereof, will be followed.” 
2.13 There are a number of ongoing risks to the financial position of the IJB; these
include but are not limited to: 
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing
across community, mental health and learning disability wards.
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Both NHS and Local Government pay awards are settled, these are both
higher than the budget assumptions for 2025-26, if the pay awards are not fully
funded then this will present an in-year cost pressure.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to reduce
the Board’s deficit may have impacts on other parts of the health and care
system. 
• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board
approved financial plan. 
• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a
heightened risk of provider failure leading to handing back of care and
contracts.
• The ongoing ability to source packages of care for service users.
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a number
of service areas and the use of high-cost agency staff to support frontline
service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
• Scot Excel inflationary increases for children’s service are significantly higher
than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire. 
These risks will continue to be closely monitored during 2025-26. 
77

Page 78

Management Actions/Controls 
2.14 The management actions outlined below will continue throughout 2025-26:   
• Review of expenditure authorisation levels across the Partnership and
escalation of specific decisions to senior officers. In particular, a new
governance group has been introduced, involving the Director and Heads of
Service, to oversee the agreement of higher value packages of care (above
£40,000 per annum).  This group has also been expanded to include care
packages for children with a disability and UNPACs placement requests.
• Staff communication in relation to discretionary/non-essential spend.
• Review of temporary posts and robust vacancy management/approval.  The
vacancy scrutiny group now has representation from all of the Heads of
Service and a recruitment freeze will be implemented for all but essential
frontline posts.
• Recruitment delay – there will be a recruitment drag with vacancy scrutiny
approved vacancies being held for four weeks before they are advertised to
create more payroll turnover.  This will be for all vacancies except clinical or
registered services vacancies or those which will incur cover costs.
• Restrictions on all but essential overtime working.
• Oversight group for looked after and accommodated children in residential
care – this group meets fortnightly to actively review all placements
• Ongoing review of future year savings or Transformation Programmes -  to
identify scope for acceleration.
• Strengthened support from Finance Team to front line services and increased
engagement with Heads of Service and Senior Management Teams,
including line by line reviews of all budget areas.  
• The Director and Chief Finance Officer have started a rolling programme of
one-to-one meetings with individual budget holders across the HSCP to
consider opportunities for cost reduction, service change and any spend to
save propositions – primarily to support the development of the 2026/27
budget but also to identify further cost reductions for the current financial
year.
Governance 
2.16 The IJB agreed to the establishment of a Finance Working Group (FWG),
consisting of IJB members and senior officers, and chaired by the IJB Vice Chair
or Vice Chair. The FWG started meeting monthly since August 2024 with the main
remit being: 
• Detailed scrutiny of in-year financial projections
• Monitoring the delivery of the financial recovery plan
• Monitoring the progress with delivery of the Transformation Plan
• Reviewing the 3-year Medium-Term Financial Outlook
• Detailed scrutiny of budget planning for the next financial year. 
78

Page 79

The FWG is not a decision-making group and all decisions in relation to the
budget which require formal agreement will continue to be made by the IJB.   
2.17 The group has focused on the most significant areas of cost pressure and has so
far undertaken deep dives into the recovery and transformation plans in the
following service areas: 
• Financial Risks
• Care at Home
• Brighter Pathways (Children’s Residential Placements)
• Older People’s Residential Care Services
• Financial Inclusion
• Charging income and opportunities
• Substitute Prescribing (Addictions) 
• The National Position for IJBs
• Older People Day Care
• 2025-26 Financial Position and Recovery Plan
• Agenda for Change
• Montrose House 
Further meetings are scheduled to the end of the year and will include follow-up
work on some of the areas above, as well as further areas identified: 
• Supplementary Staffing
• Care Packages – including Eligibility Criteria Considerations
• Brighter Pathways
• Unscheduled Care
• Care at Home Review
• Learning Disability Services – Inpatient beds and complex care
• Budget Engagement 
2.18 Building on the work of the Finance Working Group, proposals are being
developed on a rolling basis for agreement by the IJB, in advance of the budget
setting in March 2026, which will generate future recurring savings. Examples
include taking proposals related to Financial Inclusion, Older People’s Day
Services, Montrose House and Brighter Pathways outwith the March annual
budget setting, Brighter Pathways will report back to the IJB in November 2025. 
Transformation Plan  
2.19 The North Ayrshire HSCP Transformation Plan 2024-27 was approved in March
2024 and sets out an ambitious programme of change consisting of a range of
improvement and reform projects across all service areas, each aiming to improve
the quality of our services and contribute to the long-term sustainability of health
and care in North Ayrshire.  There are currently 77 change projects and
programmes on the plan, from across every area of the partnership. The Plan is
kept under review and updated through the HSCP Transformation Board with six
monthly updates provided to the IJB with the most recent update presented in
August 2025.
79

Page 80

2.20 Internal Audit recently reviewed the governance and monitoring arrangements for
the transformation programme and considered whether there are adequate
governance arrangements in place, financial monitoring arrangements are in
place and that there are adequate programme management arrangements.
Internal Audit reported to the IJB Performance and Audit Committee Substantial
Assurance for the IJB Transformation Plan arrangements.  Key messages include
- that the current governance arrangements include clear reporting lines and
involve senior managers at an appropriate level, the Transformation Board meets
regularly and has a good overview of the projects, projects have governance
arrangements which are appropriate to their size, risk registers are maintained for
the projects and regularly reviewed, exceptions are escalated and appropriate
actions put in place and financial monitoring arrangements are in place that would
highlight any significant divergences from budget. 
2.21 The main challenge remains aligning this ambitious programme of service change
to the financial challenge and future gap for the IJB. 
2026-27 and beyond 
2.22 Work is underway in relation to the development of the 2026-27 budget, which will
be agreed by IJB in March 2026, and to refresh the 3-year Medium-term Financial
Outlook for the period 2026-2029. 
2.23 The most recent MTFO, which was reported to IJB earlier in 2025, noted that there
is likely to be a significant budget shortfall which will required to be addressed in
each financial year with the most significant pressure in 2026-27, primarily due to
the local government employers pension rebate which will cease.  The MTFO
modelled the below scenarios: 
80

Page 81

2.24 A target of £10.5m has been issued to Heads of Service based on a position
between the best and medium-case scenario, this is viewed to be a realistic
potential gap based on the position experienced for 2025-26 and the employer’s
pension impact.  Budget savings are being developed in line with this anticipated
gap. 
2.25 In setting the budget for 2025-26 the IJB agreed a number of Key Budget
Principles which seek to guide the development of budget proposals and the
approach to developing and approving budget proposals: 
• Maximise income from charging for services to protect the delivery of
frontline services, ensuring that only individuals who have the means should
pay more for the services they receive directly
• Manage within available budget limits – including re-design to deliver
service within available resource 
• Maximise efficiencies in the way services are delivered through a structured
service review process
• Maximise opportunities for shared service and lead partnership delivery
across the Ayrshires
• Values-based health and care– eradicating effort that provides no benefit
for the person and a focus on self-management and prevention 
• Tighten the eligibility criteria for targeted services to prioritise delivery of
services to those with the highest levels of need and risk
• Improve services through digital innovation and maximise the use of
digitally-enabled care technology, where appropriate
• Be transparent and open in our challenges, having honest conversations
with our staff and communities
• Advocate for a better funding deal for North Ayrshire for community-based
health and care services & actively pursue opportunities for additional funding 
2.26 The majority of the IJB budget is expended on front line care, through the
workforce or commissioned services, the budget gap for 2026-27 is primarily for
the delivery of social care services, to address a gap of that scale the level of care
which is currently being delivered or commissioned is no longer sustainable and
significant reductions to care delivery budgets and spend will be required to plan
for financial balance. 
Social Work Duties 
2.27 The Chief Social Work Officer has previously presented a report to the IJB to
outline the context around Social Work Duties, Available Resource and Ethical
Considerations. Social Work encompasses a diverse range of services. In
Scotland, local authority Social Work departments or Health and Social Care
Partnerships deliver these services with the aim of supporting some of the most
vulnerable people in society and improving the quality of their lives. Most Social
Work and social care resources are directed towards adult services, mostly on
care services for older people (65 years+). Social Work services also provide
services to children and young people to help support and protect vulnerable
children and their families. Criminal justice Social Work involves a range of
services to the criminal justice system. In North Ayrshire all social work services
81

Page 82

are delivered via the Health and Social Care Partnership. 
2.28 The cross-cutting nature of Social Work means that it is regulated by a complex
and constantly evolving statutory framework. The 1968 Social Work (Scotland)
Act recognises the central role of the local authority in determining where there is
a need for the provision of community care services and how such need should be
met. The legislation, as amended in 1990, describes assessment as a two- stage
process: first the assessment of needs and then, having regard to the results of
that assessment, the local authority shall decide whether the needs of that person
call for the provision of services, services can only be provided where the resources
are available to do so.
2.29 The use of eligibility criteria applies to the second part of the assessment process.
National eligibility criteria for social care were agreed by the Scottish Government
and COSLA in 2009 and the criteria were explicitly designed to apply consistently
across all adult care groups. NAHSCP has a locally agreed eligibility criteria that
it uses, set by the IJB which defines service access at the substantial or critical
level only. These are defined as follows: 
• Critical Risk: Indicates that there are major risks to an individual’s independent
living or health and well-being and likely to call for the immediate or imminent
provision of social care services.
• Substantial Risk: Indicates that there are significant risks to an individual’s
independence or health and wellbeing and likely to call for the immediate or
imminent provision of social care services. 
2.30 Since the adoption of substantial and critical assessed need as the threshold for
accessing services in North Ayrshire there have been a number of significant
changes in relation to the operating context and the financial context along with
the emergence of a more progressive approach to service design and delivery
based around people and place.   
2.31 There has been considerable demographic change with an ageing local
population, reducing working age population, greater numbers of people living
with multiple long-term conditions, increasing numbers of children with an
identified disability along with an increased complexity of need across all age and
client groups. This is further exacerbated by the broader societal impact of
austerity, Covid and the broader effects of poverty and deprivation which has
compounded the range of difficulties society is facing.  These challenges are
acutely felt in North Ayrshire and the Collaboration for Health Equity in Scotland
(CHES) partnership between the CPP and IJB seeks to strengthen work and
accelerate action on how we improve health, increase wellbeing and reduce
inequalities in North Ayrshire. 
2.32 Alongside this social context available resources have also become more
constrained with demand far outstripping both financial and human capacity.
Managing infinite human need within finite resources has always been part and
parcel of balancing Social Work demand and capacity. Financial settlements have
resulted in significant pressures on budgets, both as a result of the changes noted
above and inflationary pressures and has resulted in residents waiting for access
82

Page 83

to services. 
2.33 Projected figures show no signs of the health and social care system being in a
place to resource itself to meet society’s needs, and within the North Ayrshire
context it is not impossible to imagine a time in the near future, where like others,
we find ourselves in a position where we will not be able to meet our statutory
duties.  The IJB will require to consider our local eligibility criteria and thresholds
as part of 2026-27 budget considerations. 
IJB Annual Audit Report 
2.34 The IJB 2024-25 Annual Audit Report produced by Audit Scotland sets out a
range of findings including: 
• concerns that the IJBs cost base is not sustainable with current funding levels
and savings from transformation not able to cover estimated costs
• there are significant risks associated with the IJB now holding no
uncommitted reserves balance which limits the ability to manage and mitigate
future financial pressures and represents a significant financial risk to both
the IJB and its partners
• the IJB has a clear strategic vision that is supported by its partners but
financial plans need to align to the vision to show how it can be delivered 
• governance arrangements are appropriate and operate effectively
• performance management arrangements are effective with 16 out of 18
national indications being achieved or above target, however delayed
discharge performance remains a challenge
• there is evidence of Best Value demonstrated by the IJB across a range of
areas, a formal mechanism for reviewing and reporting on this should be
developed
A copy of the full report, which will be considered alongside the Annual Audited
Accounts at the IJB meeting on 25th September, is included as Appendix 1. 
National Position 
Accounts Commission report 
2.35 As a follow on from their report from June 2024 entitled ‘Integration Joint Boards:
Finance and performance 2024’, the Commission published a bulletin in March
2025 with the key messages of: 
• There is a concerning picture of continued overspending, depletion of
reserves and savings being met through one-off rather than recurring
savings.
• The financial position is set to worsen with a projected funding gap of £457
million in 2024/25.
• The budget process needs collaboration and candid conversations around
the difficult choices to be made to reduce overspends and balance budgets.
83

Page 84

• IJBs need to be working collaboratively with each other and with their NHS
and council partners to find ways to transform services on a longer-term basis
so that they are affordable.
• Investment in prevention and early intervention is needed to help slow the
ever-increasing demand for services, the cost of more complex care and
improve the experience and outcomes for people.
• A continued high turnover of chief officers and chief finance officers is
concerning, adding to the risks around effective strategic planning and
decision-making.
2.36 Their report in June 2024 stated that the financial outlook for IJBs continues to
weaken with indications of more challenging times ahead with the Accounts
Commission concerned about deepening risks in the sector. The report noted that
IJBs face a complex landscape of unprecedented pressures, challenges and
uncertainties. These are not easy to resolve and are worsening, despite a driven
and committed workforce. The health inequality gap is widening, there is an
increased demand for services and a growing level of unmet and more complex
needs. There is also variability in how much choice and control people who use
services feel they have, deepening challenges in sustaining the workforce,
alongside increasing funding pressures. The Accounts Commission report that
there isn’t significant evidence of the shift in the balance of care from hospitals to
the community intended by the creation of IJBs. IJBs operate within complex
governance systems that can make planning and decision making difficult. They
cannot address the issues across the sector alone. Whole system collaborative
working is needed as part of a clear national strategy for health and social care
that will promote improved outcomes across Scotland but reflects the need to
respond to local priorities. 
Presentation of National Position 
2.37 There is regular reporting by IJBs of the individual and collective financial position
thorough internal governance mechanisms but also through audit and directly
through returns to Scottish Government Health Finance directorate. Chief Officers
met with the Cabinet Secretary on 5th March 2025 to present an overview of the
national picture for IJBs, some of the context around the rising pressures and cost
of services, and to bring to life the impact of a critically challenging financial
position for service delivery, risks and performance expectations in the coming
year. 
2.38 North Ayrshire IJB is not alone in facing these challenges and whilst there is
variation around the scale of the gap for IJBs, there are many similarities in the
pressures facing IJBs across Scotland.  Integration Joint Boards across the
country are reporting similar financial challenges, with many having exhausted
their unearmarked reserves during 2023/24 or 2024/25, and the majority having
financial recovery plans in place for 2025/26 to address a projected overspend
position. This situation is driven by the well- documented increases in demand for
health and social care services, the high levels of cost inflation in recent years
and a lack of investment in additional capacity over a number of years. 
84

Page 85

The Cabinet Secretary received a presentation which highlighted: 
• 2025-26 projected budget gap of £562m (subsequently updated to £497m)
and the worsening position for reserves with the majority if IJBs with no
contingency reserves and only one with more than 2% recommended
minimum level 
• Historical funding settlements for IJBs
• Trends in health and adult social care spend
• Risks to the financial position, service provision and performance 
• Scale of the impact in terms of service provision levels
• Social Care provider sustainability risks
• A case study from an area illustrating the link between financial resources
and 
• Delayed discharge performance
• Priority of need and risk management
• Links to national priorities and policy directives 
Chief Officers set out a number of asks in relation to: 
• appreciated the opportunity to share the scale of the collective challenge
and have this understood and heard – and want the opportunity to build in
more regular visibility of this
• recognise there is limited resource available which has not already been
committed on other priorities – however would seek to influence decision
making around priorities for future resources. Currently working within
local systems on the whole system plans to inform the NHS Renewal
submissions. Chief Officers would ask that consideration is given to the
priority for investment in community services and that any resource asks
from IJBs are prioritised 
• Would ask that there is a greater appreciation that there is local variation
and complex reasons for this, the solutions and decisions required across
areas may therefore be different
• Lastly, seek that our positions are understood and appreciated at a
national and local level, and that there is a level of understanding and
honest reflection of the reality of the financial pressures and difficult
decisions required. Would ask for support to manage public and political
expectations around the scale of change, service impacts and implications
for performance. 
A full copy of the presentation is included as Appendix 2. 
NHS Scotland Renewal 
2.39 In January 2025, the First Minister set out his priorities for improving public
services and NHS renewal – these are Improving access to treatment, Shifting
the balance of care, Improving access to health and care services through digital
and technological innovation and Prevention. 
2.40 The approach to delivering this is across 3 phases and plans:
85

Page 86

• Operational Improvement Plan – published March 2025 – focus on immediate
actions over 12-18 months to reduce waiting lists, support delayed discharge,
primary care enhancements and Dental and optometry plans – circa £200million
attached to this Plan
• Population Health Framework 2025-2035 – published June 2025 – sets out
ambition for 10 year cross-sector approach focussed on primary prevention,
tacking root causes of poos health and reducing inequalities and the 80% of
what happens outwith health and social care with two initial priorities embedding
prevention in systems and health weight – there is no funding currently aligned
to the Framework
• Service Renewal Framework – published June 2025 – longer term strategy to
transform how we plan, deliver and experience health and care services, sets
out principles changes and enabling shifts with 5 core principles of Prevention,
People, Community, Population and Digital – there is no funding currently
aligned to the Framework 
2.41 The Scottish Government wrote to Health Boards and Health and social Care
Partnerships in February 2025 requesting detailed Whole System Improvement
Plans which would describe the local action that would be taken to deliver the First
Minister’s priorities relating to flow. North Ayrshire HSCP submitted a plan
requesting a total of £9.5m of investment, with investment requested for Care at
Home Services, Multidisciplinary Teams, Mental Health Officers, Care Home beds,
technology and community rehabilitation capacity.  The plans were developed in
collaboration with colleagues from Acute services and both East and South HSCPs
on the development of whole system plans and the ask across NHS Ayrshire and
Arran totaled around £24million.  The funding is linked to additional capacity, new
models of care and performance improvement, it will be provided on a payment by
results basis and there is no an opportunity for the funding to offset or compensate
for underlying funding deficits or overspends. 
2.42 Senior Officers from North Ayrshire met with the Cabinet Secretary in May 2025 to
share our challenges and asks in relation to the plans and funding and our specific
plans we would seek to progress in North Ayrshire to improve performance, reduce
waits for social care services both within the community and hospital settings. 
2.43 In June 2025 NHS Ayrshire and Arran (NHS AA) received a funding allocation of
£10.079m, this includes £1.7m for Hospital at Home Services, £6m for Discharge
without Delay and Frailty Services and £2.4m of Core Unscheduled Care Funding,
this being the baselining of a funding allocation that NHS AA has received for a
number of years.    From the £6m allocation £1.081m is specifically ring-fenced for
North Ayrshire for MDT and MHO investment and the HSCP has commenced
recruitment to these roles.  There is a draft revised prioritised plan for the remainder
of the £5m Pan Ayrshire investment and for North Ayrshire this includes a £1.2m
in Care at Home Reablement services with the purpose of addressing hospital
demand and performance but also to support the further reduction of the
community based mainstream Care at Home Service through proactive reablement
approaches and reviews. This funding allocation has yet to be approved through
NHS AA governance to allow recruitment to commence. 
86

Page 87

Scottish Government Medium Term Financial Strategy 
2.44 In June 2025 the Scottish Government published their Medium Term
Financial Strategy (MTFS).  Within this it is set out that Scotland is facing
various population health challenges – our population is ageing, demand for health
and social care services is rising and health inequalities are widening. In addition,
the impacts of inflation, rising energy costs and Brexit mean that the finite funding
is worth less in real terms but is expected to deliver more. NHS Boards have set
ambitious recurring savings plans while seeking to manage ongoing operational
and demand pressures. With spending challenges in new medicines, procurement
and in workforce pay.  
2.45 Within the MTFS for Health and Social Care, based on growth in spending in recent
years, spending is assumed to increase on average by 3.3 per cent real growth a
year and as this constitutes almost 40 percent of the Scottish Budget, the Scottish
Government’s resource spending forecast is very sensitive to any changes in this,
each 1 percent more or less than this would have an impact of £225million.  The
Fiscal Framework does not make expenditure commitments nor give any indication
of the relative priority for Health and Social Care, this will be outlined in the
spending review and budget for 2026-27. 
2.46 The overall strategic objective of the Spending Review is to ensure that spending
delivers Ministerial priorities effectively and efficiently – this being particularly
important in light of the challenging fiscal context.  This will mean providing an
overall multi-year spending envelope which is fiscally sustainable, ensuring that
government spending is targeted at their 4 priorities, ensuring value for money, and
providing multi-year certainty to support planning. 
3. Proposals 
3.1 It is proposed that Cabinet notes the financial position of the IJB, the work being
undertaken to improve the in-year position and the ongoing risks. 
4. Implications/Socio-economic Duty
Financial
4.1 There is a financial risk to the Council if the IJB remains in an overspend position
at the end of the financial year. 
Human Resources 
4.2 None. 
Legal 
4.3 The preparation of a Financial Recovery Plan by the IJB complies with the
requirements of the Integration Scheme.  The delivery of Social Work services
87

Page 88

remains a statutory duty of North Ayrshire Council whilst delegated to be delivered
by the Health and Social Care Partnership. 
Equality/Socio-economic 
4.4 The report sets out that there been considerable demographic change with an
ageing local population, reducing working age population, greater numbers of
people living with multiple long-term conditions, increasing numbers of children with
an identified disability along with an increased complexity of need across all age and
client groups.  The level of current and future projected demand placed on health
and social care services in North Ayrshire is unable to be met from the resources
currently available. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report covers matters which contribute to the key priorities contained within the
Council and IJB strategic plans. 
Community Wealth Building 
4.7 None 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5 Consultation 
5.4 No consultation has been required in the preparation of this report. 
Caroline Cameron
Director (Health and Social Care) 
For further information please contact Caroline Cameron, Director (Health and
Social Care), on carolinecameron@north-ayrshire.gov.uk. 
88

Page 89

Background Papers 
North Ayrshire IJB Reports: 
• 2024-25 Year End Financial Performance - Document.ashx
• 2025-26 Revenue Budget 2025-26 and beyond - Document.ashx
• 2025-26 Month 3 Financial Performance - Document.ashx 
89

Page 90

North Ayrshire
Integration Joint
Board
2024/25 Annual Audit Report 
Prepared for North Ayrshire Integration Joint Board and the Controller of Audit 
September 2025
Appendix 1
90

Page 91

North Ayrshire Integration Joint Board: 2024/25 Annual Audit Report | 2 
Contents 
Key messages 3
Introduction 5
Audit scope and responsibilities 6
Audit of the annual accounts 8
Wider scope and Best Value audit 12
Appendix 1 28
Appendix 2 30
Appendix 3 33 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
91

Page 92

Key messages | 3 
Key messages 
Audit of the annual accounts
1 All audit opinions stated that the annual accounts were free from material
misstatement. 
2 There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed by
North Ayrshire Integration Joint Board (NAIJB).
Financial Sustainability 
3 In 2024/25 a budget overspend of £3.593 million was reported, covered by
additional funding contributions from partners.
4 The IJB used £4.730 million of reserves in the year.  At 31 March 2025 the
IJB has £3.161 million of earmarked reserves and no uncommitted reserves.
The IJB Reserves Strategy recommends that the IJB will aspire to hold
between 2 and 4% of its annual budgeted expenditure as an uncommitted
reserve. The lack of any uncommitted reserves therefore represents a
significant financial risk to both the IJB and its partners.
5 The 2025/26 budget included proposed savings of £4.019 million.  The latest
six-month progress update on the IJB’s transformation plan reports a £2.93
million savings and overspend reduction target for 2025/26. 
6 The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best case to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels and
savings from transformation will not cover the estimated costs.  The IJB
needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
Other Wider scope and Best Value audit 
7 The IJB has a clear strategic vision that is supported by its partners but
financial plans need to align to the vision to show how it can be delivered.  
92

Page 93

Key messages | 4 
8 Performance management arrangements are effective.  Of the 18 national
indicators, 16 (89%) either achieved or were above target for 2024/25. 
However delayed discharges have increased by more than 61% over the
same period.
9 There is evidence of elements of Best Value being demonstrated by the IJB
across a range of areas.  However the mechanism for formally reviewing and
reporting on the arrangements to secure Best Value needs to be formalised
and reported to the board. 
93

Page 94

Introduction | 5 
Introduction 
Purpose of the Annual Audit Report
1.  The purpose of this Annual Audit Report is to report the significant
matters identified from the 2024/25 audit of North Ayrshire Integration
Joint Board annual accounts and the wider scope areas specified in the
Code of Audit Practice (2021).
2.  The Annual Audit Report is addressed to North Ayrshire Integration
Joint Board, hereafter referred to as ‘the IJB’ and the Controller of Audit,
and will be published on Audit Scotland’s website in due course. 
Appointed auditor and independence
3.  Fiona Mitchell Knight, of Audit Scotland, has been appointed as
external auditor of the body for the period from 2022/23 until 2026/27. As
reported in the Annual Audit Plan, Fiona Mitchell Knight as engagement
lead and the audit team are independent of the IJB in accordance with
relevant ethical requirements, including the Financial Reporting Council’s
Ethical Standard. There have been no developments since the issue of the
Annual Audit Plan that impact on the continued independence of the
engagement lead or the rest of the audit team from the IJB, including no
provision of non-audit services. 
Acknowledgements
4.  We would like to thank the Audit and Performance Committee
members, Joint Board members, senior management, and other staff,
particularly those involved in the preparation of the annual accounts, for
their cooperation and assistance during the audit. We look forward to
working together constructively over the remainder of the five-year audit
appointment.
94

Page 95

Audit scope and responsibilities | 6 
Audit scope and responsibilities 
Scope of the audit 
5.  The audit is performed in accordance with the Code of Audit Practice,
including supplementary guidance, International Standards on Auditing
(ISA) (UK), and relevant legislation. These set out the requirements for the
scope of the audit which includes: 
• An audit of the financial statements and an opinion on whether they
give a true and fair view and are free from material misstatement. 
• An opinion on statutory other information published with the financial
statements in the annual accounts, namely the Management Commentary
and Annual Governance Statement.
• An opinion on the audited part of the Remuneration Report. 
• Conclusions on the IJB’s arrangements in relation to the wider scope
areas: Financial Management; Financial Sustainability; Vision, Leadership
and Governance; and Use of Resources to Improve Outcomes. 
• Reporting on the IJB’s arrangements for securing Best Value.
• Provision of this Annual Audit Report.
Responsibilities and reporting
6.  The Code of Audit Practice sets out the respective responsibilities of the
body and the auditor. A summary of the key responsibilities is outlined
below. 
Auditor’s responsibilities
7.  The responsibilities of auditors in the public sector are established in
the Local Government (Scotland) Act 1973. These include providing an
independent opinion on the financial statements and other information
reported within the annual accounts, and concluding on the IJB’s
arrangements in place for the wider scope areas and Best Value.
8.  The matters reported in the Annual Audit Report are only those that
have been identified by the audit team during normal audit work and may
not be all that exist. Communicating these does not absolve the IJB from
its responsibilities outlined below. 
95

Page 96

Audit scope and responsibilities | 7 
9.  The Annual Audit Report includes an agreed action plan at Appendix 1
setting out specific recommendations to address matters identified and
includes details of the responsible officer and dates for implementation.
The body’s responsibilities
10.  The IJB has primary responsibility for ensuring proper financial
stewardship of public funds, compliance with relevant legislation and
establishing effective arrangements for governance, propriety, and
regularity that enables it to successfully deliver its objectives. The features
of proper financial stewardship include: 
• Establishing arrangements to ensure the proper conduct of its affairs. 
• Preparation of annual accounts, comprising financial statements for the
body that gives a true and fair view and other specified information. 
• Establishing arrangements for the prevention and detection of fraud,
error and irregularities, and bribery and corruption. 
• Implementing arrangements to ensure its financial position is soundly
based. 
• Making arrangements to secure Best Value. 
• Establishing an internal audit function.
Communication of fraud or suspected fraud
11.  In line with ISA (UK) 240 (The Auditor’s Responsibilities Relating
to Fraud in an Audit of Financial Statements), in presenting this report to
the Performance and Audit Committee we seek confirmation from those
charged with governance of any instances of actual, suspected or alleged
fraud that should be brought to our attention. Should members have any
such knowledge or concerns relating to the risk of fraud within the IJB, we
invite them to communicate this to the appointed auditor for consideration
prior to the Annual Accounts being certified.
National performance audit reporting
12.  The Auditor General for Scotland and the Accounts Commission
regularly publish performance audit reports. These cover a range of
matters, many of which may be of interest to the Integration Joint Board.
Details of national and performance audit reports published over the last
year can be seen in Appendix 3.
96

Page 97

Audit of the annual accounts | 8 
Audit of the annual accounts 
Main judgements
All audit opinions stated that the annual accounts were free from
material misstatement. 
There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed
by the body.
Audit opinions on the annual accounts 
13.  The IJB’s annual accounts were approved at the meeting of the
Integration Joint Board on 27th June 2025 and certified by the appointed
auditor on 25th September 2025. The Independent Auditor’s Report is
included in the body’s annual accounts, and this reports that, in the
appointed auditor’s opinion, these were free from material misstatement. 
Audit timetable 
14.  The unaudited annual accounts and all working papers were
received by 30 June 2025 in accordance with the agreed audit timetable. 
Audit Fee
15.  The audit fee for the 2024/25 audit was reported in the Annual
Audit Plan and was set at £34 thousand. There have been no
developments that impact on planned audit work required, therefore the
audit fee reported in the Annual Audit Plan remains unchanged. 
Materiality
16.  The concept of materiality is applied by auditors in planning and
performing an audit, and in evaluating the effect of any uncorrected
misstatements on the financial statements or other information reported in
the annual accounts.
17.  Broadly, the concept of materiality is to determine whether
misstatements identified during the audit could reasonably be expected to
influence the decisions of users of the annual accounts. Auditors set a
monetary threshold when determining materiality, although some issues
may be considered material by their nature. Therefore, materiality is
ultimately a matter of the auditor’s professional judgement.
97

Page 98

Audit of the annual accounts | 9 
18.  Materiality levels for the audit of the IJB were determined at the
risk assessment phase of the audit and were reported in the Annual Audit
Plan, which also reported the judgements made in determining materiality
levels. These were reassessed on receipt of the unaudited annual
accounts and updated as can be seen in Exhibit 1.
Exhibit 1
2024/25 Materiality levels for the IJB 
Materiality  IJB
Materiality – set at 2% of gross expenditure  £7.640 million
Performance materiality – set at 70% of materiality.
As outlined in the Annual Audit Plan, this acts as a
trigger point. If the aggregate of misstatements
identified during the audit exceeds performance
materiality, this could indicate further audit procedures
are required. 
£5.350 million
Reporting threshold – set at 5% of materiality.   £0.380 million
Source: Audit Scotland
Significant findings and key audit matters 
19.  ISA (UK) 260 requires auditors to communicate significant findings
from the audit to those charged with governance, which for the body is the
Integration Joint Board.
20.  The Code of Audit Practice also requires public sector auditors to
communicate key audit matters. These are the matters that, in the
auditor’s professional judgement, are of most significance to the audit of
the financial statements and require most attention when performing
the audit. 
21.  In determining key audit matters, auditors consider:
• Areas of higher or significant risk of material misstatement. 
• Areas where significant judgement is required, including accounting
estimates that are subject to a high degree of estimation uncertainty. 
• Significant events or transactions that occurred during the year.
22.  There are no significant findings or key audit matters to report.
98

Page 99

Audit of the annual accounts | 10 
Qualitative aspects of accounting practices 
23.  ISA (UK) 260 also requires auditors to communicate their view
about qualitative aspects of the body’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies 
24.  The appropriateness of accounting policies adopted by the body
was assessed as part of the audit. These were considered to be
appropriate to the circumstances of the body, and there were no
significant departures from the accounting policies set out in the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). 
Accounting estimates 
25.  Accounting estimates are used in number of areas in the body’s
financial statements.  Audit work considered the process management of
the body has in place around making accounting estimates, including the
assumptions and data used in making the estimates, and the use of any
management experts. Audit work concluded:  
• There were no issues with the selection or application of methods,
assumptions, and data used to make the accounting estimates, and these
were considered to be reasonable. 
• There was no evidence of management bias in making the accounting
estimates.
Disclosures in the financial statements
26.  The adequacy of disclosures in the financial statements was
assessed as part of the audit. The quality of disclosures was adequate,
with additional levels of detail provided for disclosures around areas of
greater sensitivity.
Significant matters discussed with management
27.  All significant matters identified during the audit and discussed
with the body’s management have been reported in the Annual Audit
Report.
Audit adjustments
28.  No audit adjustments were required to the financial statements
greater than the reporting threshold of £0.380 million.
Significant risks of material misstatement identified in the
Annual Audit Plan
29.  Audit work has been performed in response to the significant risks
of material misstatement identified in the Annual Audit Plan. The outcome
of audit work performed is summarised in Exhibit 2.
99

Page 100

Audit of the annual accounts | 11 
Exhibit 2 
Significant risks of material misstatement to the financial statements 
Risk of material
misstatement Planned audit response Outcome of audit work
Fraud caused by
management override of
controls 
Management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
The audit team will:
• Assurances will be
obtained from the auditors
of NHS Ayrshire and Arran
and North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure. 
• Evaluate any significant
unusual transactions
outside the normal course
of business. 
Audit work performed found:
• We obtained assurances
from the auditors of NHS
Ayrshire and Arran and
North Ayrshire Council
over the completeness,
accuracy and allocation of
income and expenditure.
• No significant unusual
transactions outside the
normal course of business.
Conclusion: no evidence of
fraud caused by
management override of
controls. 
Source: Audit Scotland 
100

Page 101

Wider scope and Best Value audit | 12 
Wider scope and Best Value
audit 
Conclusion
The 2024/25 year end budget overspend of £3.593 million was met by
additional funding contributions from partners.  
The IJB utilised £4.730 million of reserves in year.  At 31 March 2025
the IJB has £3.161 million of earmarked reserves and no uncommitted
reserves. This represents a significant financial risk to both the IJB and
its partners.
The 2025/26 budget included proposed savings of £4.019 million. The
latest six-month progress update on the IJB’s transformation plan
reports a £2.93 million savings and overspend reduction target for
2025/26.
The Medium-Term Financial Outlook has identified required savings of
between £8.1 million and £21.4 million in 2026/27 (best to worst case
scenarios). The IJB’s cost base is not sustainable; current funding levels
and savings from transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and cost reductions if it is to
demonstrate financial sustainability.
The IJB has a clear strategic vision that is supported by its partners but
financial plans need to be aligned to the vision to show how it can be
delivered.  
Performance management arrangements are effective.  Of the 18
national indicators, 16 (89%) either achieved or were above target for
2024/25.  However delayed discharges have increased by more than
61% over the same period. 
Whilst there is evidence of elements of Best Value being demonstrated
by the IJB across a range of areas, the mechanism for formally
reviewing and reporting on the arrangements to secure Best Value
needs to be formalised and reported to the board. 
101

Page 102

Wider scope and Best Value audit | 13 
Audit approach to wider scope and Best Value
Wider scope
30.  As reported in the Annual Audit Plan, the wider scope audit areas
are: 
• Financial Management.
• Financial Sustainability.
• Vision, Leadership and Governance.
• Use of Resources to Improve Outcomes. 
31.  Audit work is performed on these four areas and a conclusion on
the effectiveness and appropriateness of arrangements the body has in
place for each of these is reported in this chapter. 
Best Value 
32.  The duty on auditors to consider the arrangements in place to
secure Best Value applies to the body as it falls within section 106 of the
Local Government (Scotland) Act 1973.
33.  Consideration of the arrangements the body has in place to secure
Best Value has been carried out alongside the wider scope audit. 
Significant wider scope and Best Value risks 
34.  Audit work has been performed in response to the significant wider
scope and Best Value risks identified in the Annual Audit Plan. The
outcome of audit work performed is summarised in Exhibit 3.
102

Page 103

Wider scope and Best Value audit | 14 
Exhibit 3
Significant wider scope and Best Value risks
Significant risk Planned audit response Outcome of audit work
Financial planning and
sustainability 
At month 7 against the full-
year budget of £324.231m
there is a projected year-end
overspend of £6.190m
(1.9%), reduced to £3.613m
through identified financial
recovery actions.  This overall
position consists of a
projected residual overspend
of £2.548m in social care
services and a projected
overspend of £1.065m in
health services. The IJB has
approached NAC and
NHSAA for additional
funding.  
Current budget scenarios for
2025/26 are a £0.6m
underspend (best-case),
£3.7m overspend (medium-
case) and a £11.8m
overspend (worst-
case).  Additional budget
savings will require to be
identified to achieve a
balanced budget position for
approval by the IJB in
March.  
The audit team will: 
• Monitor progress in
achieving the 2024/25
revenue budget,
2024/25 financial
recovery actions and
cost avoidance plans.  
• Review of financial
performance reports
presented to the
Board. 
• Review the medium-
term financial plan and
assessment of plans to
address any
forecasted budget
deficits. 
• Evaluate the IJB’s
progress with the
development of its
Transformation Plan
and assess how this is
contributing to the
achievement of
financial balance.
Audit work identified that:
• The 2024/25 budget was
overspent by £3.593
million which was funded
by contributions from
partners. 
• Medium term financial
forecasts show significant
funding gaps in 2026/27
and 2027/28.
• There are no approved
plans to meet the budget
gaps set out in the Medium
Term Financial Outlook.
This needs to be
addressed as a matter of
urgency.
Conclusion: There is a
risk that the IJB is unable
to deliver the
transformational change or
cost reductions at the pace
required.
Source: Audit Scotland
Prior year recommendations 
35.  The IJB has made some progress towards implementing the
agreed prior year recommendations relating to the wider scope audit.
Progress against these is outlined in Appendix 2 of this report.  Two
remain ongoing and will be followed up again as part of the 2025/26 audit.
103

Page 104

Wider scope and Best Value audit | 15 
Conclusions on wider scope audit
Financial Management 
A balanced budget was set for 2024/25 this included
£10.290 million of savings proposals with no draw on
reserves 
36.  The IJB set a balanced budget for 2024/25 on 14 March 2024.
This did not require any draw on reserves but did include the approval of
£10.290 million of savings to achieve financial balance.  Required savings
were split £9.255 million social care and £1.035 million health services.
37.  £7.238 million of the social care savings arose from the non-
recurring reduction in employer superannuation contribution rates from 1
April 2024.  A further £0.375 million was a reduction in the number of
funded care home places by 15, leaving budgetary provision for 765
places at average cost.  The largest element of health savings was £0.5
million from a reduction in Hospital Based Complex Continuing Care
provision.
The 2024/25 year end budget overspend of £3.593 million
was met by additional funding contributions from
partners
38.  The year end budget was overspent by £1.212 million, prior to
transfer of unspent funding allocations of £2.381 million to earmarked
reserves.  This resulted in an overall overspend of £3.593 million. The
Integration Scheme provides for funds to be made available (by the
partners) for overspends against the operational budget.  However the
partners also agreed to make funds available for the carry forward of
unspent Scottish Government funding allocations including Whole Family
Wellbeing (£0.9 million), Alcohol and Drug Partnership (£0.4 million),
Mental Health Recovery and Renewal (£0.4 million) and Primary Care
Improvement Fund (£0.3 million).  
39.  North Ayrshire Council considered this at their Cabinet meeting of
3 June 2025 and agreed to a non-recurring funding increase of £2.036
million and no requirement to repay the funds in future years.  Similarly,
NHSAA funded the health services overspend of £1.557 million.
40.  The Chief Officer reported to the IJB meeting of 19 June 2025 that
the required savings of £10.290 million had been achieved in full.
41.  Significant variations from budget included Care at Home which
was £2.712 million overspent reflecting the cost of meeting the increased
demand and level of provision for care at home support.  In addition, Care
104

Page 105

Wider scope and Best Value audit | 16 
Experienced Children and Young People was overspent by £1.903 million,
mainly due to increased demand for children’s residential placements.
The IJB utilised £4.730 million of reserves in year.  At 31
March 2025 the IJB has £3.161 million of earmarked
reserves and no uncommitted reserves. This represents a
significant financial risk to both the IJB and its partners
42.  One of the key measures of the financial health of a body is the
level of reserves held. The IJB general fund reserve can be earmarked
balances for future commitments or uncommitted balances. The IJB’s
reserve strategy was approved by the Board in March 2024. The strategy
outlines a target contingency level of 2 - 4% of annual budgeted
expenditure.
43.   At 31 March 2025, the IJB had no uncommitted reserve balances
against the target level for the year of £6.715 - £13.430 million.  The
absence of any uncommitted general fund reserves seriously limits the
IJB’s ability to manage and mitigate future financial pressures and
represents a significant financial risk to both the IJB and its partners.
44.  In 2023/24 we recommended that the IJB must urgently map a
clear route to bring uncommitted reserves back up to the minimum
level. The IJB accepts and acknowledges that uncommitted reserves
require to be restored to the minimum recommended level.  However the
Annual Accounts also report that in the short-term, service pressures
mean that this will not be achievable.
45.  Total earmarked reserves of £3.161 million include the unspent
funding allocations of £2.381 million noted at paragraph 38 above together
with the balance of £0.780 million on the Service Redesign/Challenge
Fund.
46.  Whilst concerns are highlighted in relation to the uncommitted
reserves and a requirement to reinstate these as a tool for effective
financial management and sustainability, it is acknowledged that the
balance of reserves will be considered as part of the IJB annual budget
setting process. Whilst the ambition would be to plan to replenish the
contingency reserves for the IJB in future years, in setting the budget for
2025/26 the IJB were advised that the reality is in the current financial
operating environment there is not the ability or scope to plan for this in
the short term.  This is acknowledged as a challenge for all IJBs, with
reports that at the end of 2024/25 over half of IJBs across Scotland hold
no contingency reserve and only one area is expected to have reserves
over 2% moving into 2025/26. 
105

Page 106

Wider scope and Best Value audit | 17 
Financial systems of internal control operated effectively 
47.  The IJB is reliant on the systems of its partner bodies. NHS
Ayrshire and Arran and North Ayrshire Council, for its key financial
systems, including ledger and payroll. All IJB transactions are processed
through respective partners’ systems and all controls over those systems
are within the partner bodies rather than the IJB.
48.  As part of our audit approach, we sought assurances from the
external auditors of NHS Ayrshire and Arran and North Ayrshire Council
(in accordance with ISA 402) and confirmed there were no weaknesses in
the systems of internal control for either the health board or council.
High absence rates were reported in areas which require
cover arrangements, principally care at home.  In 2024/25
this resulted in additional costs of £1.05 million
49.  Overtime costs of £1.05 million were incurred by the HSCP to
provide absence cover requirements.   For Care at Home (£0.85 million)
the HSCP budgets for a full establishment but overtime is funded through
vacant posts or ‘20 hour’ posts. Cover requires to be provided as service
users cannot be left without a life and limb service. The remaining £0.2
million relates to the children’s houses which also require that any
absences are covered, and financial inclusion which relates to overtime
worked as part of the financial reassessment process.
50.  A performance report for Quarter 1 2025/26 submitted to the
Performance and Audit Committee in September 2025 outlined that
wellbeing action plans around sickness absence levels within the Care at
Home workforce were being robustly managed and supporting staff to
maintain attendance/return to work. Despite these efforts the service saw
an increase in front line staff absences by a further 1% from Quarter 4
2024 to 2025 to Quarter 1 2025 to 2026, with sickness absence now over
14%. The service has also experienced significant challenges in sickness
absence and vacancies within non-frontline service delivery roles.
Standards of conduct and arrangements for the
prevention and detection of fraud and error were
appropriate 
51.  The IJB does not maintain its own policies relating to the
prevention and detection of fraud and error but instead depends on those
in place at its partner bodies. We reviewed the arrangements in place at
NHS Ayrshire and Arran and North Ayrshire Council through consideration
of the work by partner body auditors and found them to be adequate. 
106

Page 107

Wider scope and Best Value audit | 18 
52.  Appropriate arrangements are in place for the prevention and
detection of fraud and error. We are not aware of any specific issues we
require to bring to your attention.
Financial Sustainability 
The IJB cannot demonstrate the financial sustainability of
its services
53.  Financial sustainability looks forward to the medium and longer
term to consider whether the body is planning effectively to continue to
deliver its services or the way in which they should be delivered. 
54.  As outlined at Exhibit 3, a significant wider scope risk was
identified around financial sustainability. We have noted below significant
challenges going forward in the IJB’s ability to achieve financial balance. 
55.  The IJB approved its medium term financial plan 2025-2028 in
December 2024.   An update to the original projected funding gap was
presented to the IJB in March 2025 as part of the annual budget for
2025/26.
The 2025/26 budget includes proposed savings of £4.019
million
56.  As set out in Exhibit 4, the 2025/26 budget has a funding gap of
£3.069 million and the IJB approved savings of £4.019 million.  This level
of savings was proposed to create a surplus of £0.950m as a contingency
towards any 2024/25 overspends which would continue into 2025/26.  The
IJB was updated on the projected implications of overspends in 2024/25
moving into the new financial year and additional savings were approved
to support the management of these overspends during 2025/26 rather
than any surplus being planned to for example reinstate reserves.
107

Page 108

Wider scope and Best Value audit | 19 
Exhibit 4
North Ayrshire IJB 2025/26 Budget Gap and Savings 
Source: North Ayrshire IJB
57.  The £4.019 million savings are rated £2.984 million Amber and
£1.035m Green.  Amber rated savings include: Improve outcomes for care
experienced young people (£1.0 million);  Continued review of Care at
Home service (£0.5 million); and review of Financial Inclusion Service
(£0.36 million).  
58.  There is considerable uncertainty around a significant proportion
of these savings.  For example, improving outcomes for care experienced
young people will require significant understanding of both the costs
associated with the current system and to identify what needs to change,
and further reduction in the care at home service has the potential to
create cost pressures in other parts of the system. Care Experienced
Children and Young People is projected at Month 3 to overspend by
£2.857 million in 2025/26.  Care at Home is projected at Month 3 to be
£1.641 million overspent in 2025/26. In addition and as noted at para 41
above, both of these areas were significantly overspent in 2024/25.  The
Chief Officer has confirmed that issues are being addressed by various
initiatives, monitoring and review.  
The Medium-Term Financial Outlook has identified
required savings of between £13.6 million and £21.4
million in 2026/27
59.  A Medium-Term Financial Outlook (MTFO) has been prepared to
identify what the financial position may look like moving into 2026/27 and
2027/28.  The MTFO notes that for 2025/26, the outturn was between the
projected medium and the worst case scenarios for that year and it would
be prudent to assume a similar position for2026/27 and 2027/28.  As set
108

Page 109

Wider scope and Best Value audit | 20 
out at Exhibit 5, the modelling which has been carried out has identified
required savings of between £13.6 million and £21.4 million for 2026/27
and between £5.7 million and £14.7 million for 2027/28.
60.  The significant shortfall in 2026/27 is linked to the expected
increase in local government employer pension contributions from 6.5% in
2025/26 to 17.5% in 2026/27.
Exhibit 5 
North Ayrshire MTFO 2026/27 – 2027/28 
Source: North Ayrshire IJB
The MTFO indicates the IJB’s cost base is not
sustainable; current funding levels and savings from
transformation will not cover the estimated costs.  The
IJB needs to support more radical reform and reduce the
cost base if it is to demonstrate financial sustainability
61.  The Accounts Commission’s July 2024 report on Integration Joint
Boards: Finance and Performance 2024 emphasised the need for a more
significant transformation of services to achieve financial sustainability.
This is becoming increasingly important as recurring savings get more
difficult to identify and achieve.   
62.  The overall picture, set out by the Accounts Commission is
concerning. It shows a continued picture of overspending, depletion of
reserves and reliance on one-off rather than recurring savings. There is a
need for transformational changes in the way services are being delivered
and for the identification and delivery of significant recurring savings. IJBs
in Scotland also need to be working collaboratively with each other and
with their NHS and council partners to find ways to transform services on a
longer-term basis so that they are affordable.
63.  In 2023/24 we reported that the IJB has recognised that the
challenging financial environment it is operating in will likely continue for
some years to come and agreed an updated Transformation Plan 2024-27
in March 2024. We also reported that the Service Redesign and Change
109

Page 110

Wider scope and Best Value audit | 21 
Fund aims to support the Transformation Plan through the redesign of
services and investments in new technologies. The balance on the Fund
at 31 March 2025 was £0.780 million. These funds are allocated on a non-
recurring basis.  
64.  An Internal Audit review of IJB transformation submitted to the
September 2025 Performance and Audit Committee gave an opinion of
substantial assurance in relation to the governance of the Transformation
Plan.  
65.  Not all projects in the Transformation Plan have a direct financial
impact although a number will deliver financial savings.  Of the 75 projects
approved in March 2024, 40 were reported as having a financial impact. 
Some financial targets were identified as part of the budget development
for 2025/26.  Identified savings and overspend reductions are tracked in
the online trackers.
66.    The latest six-month progress update was provided to the IJB in
August 2025.   The report provided updates on specific projects across all
service areas and notes a £2.93 million savings and overspend reduction
target for 2025/26. 
67.  The Transformation Plan is critical to the ongoing sustainability of
service delivery.  In 2023/24 we reported that that the refreshed
Transformation Plan includes timescales and is being overseen by the
IJB’s Transformation Board.  However based on current projections,
savings from transformation fall significantly short of the potential budget
gaps in 2026/27 and 2027/28.  Financial recovery from this position will
require radical reform of services.  Whilst the transformation programme
needs to be sufficiently ambitious to respond to the scale of the financial
challenges, the Chief Officer is clear that future recurring savings also
need to be made through workforce changes, service review and charging
reviews. In the absence of any contingency reserve of its own, the
increased demand for health and social care services alongside rising
costs presents a significant financial risk to both the IJB and its partners.
68.  Recurring pressures are currently being met with a combination of
recurring and non-recurring solutions with an underlying recurring over-
commitment. This needs to be addressed as a matter of urgency. An
effective medium term financial recovery plan needs to be introduced, and
decisions made about the way services are delivered in the short, medium
and longer-term based on information about the cost, impact and quality of
all available options. Detailed scenario planning should also be
undertaken to provide an understanding for the IJB of the effects of
various reform options.
69.  In 2023/24 we reported that in order to facilitate greater scrutiny of
the financial position and the delivery of the financial recovery plan during
2024/25.  The IJB agreed at its June 2024 meeting to establish a ‘Finance
Working Group’, chaired by the IJB Vice Chair. The Director and Heads of
110

Page 111

Wider scope and Best Value audit | 22 
Service are members of the group. This Group will continue to meet
monthly during 2025/26 to facilitate increased oversight and scrutiny of the
financial position and transformation programme as well as detailed
budget planning for future financial years.
70.  Change and cost base reduction now needs to happen quickly if
the IJB is to address its transformational challenges. More focused and
effective leadership is needed to drive the change and to promote a
culture of challenge. Joint Board members should challenge the progress
being made.
Recommendation 1:  The Chief Officer, Joint Board members and the
Finance Working Group need to produce a financial plan that
demonstrates how efficiencies from service reform, cost base reduction
and transformation will meet the budget gaps outlined in the MTFO. 
Progress should be reviewed and challenged by the board.  
71.  There are an additional number of risks and challenges faced by
the IJB from the anticipated budget pressures.
72.   We have previously reported that IJBs, with the support of council
and NHS board partner bodies, should be clear about how and when they
intend to achieve their priorities and outcomes, in line with their available
resources; and ultimately how they intend to progress to sustainable,
preventative and community-based services. 
73.  The IJB needs to operate within its delegated budgets however
there are a number of risks and challenges faced by the IJB from the
anticipated budget pressures. For example: 
• The IJB is stopping or reducing services to deliver from within
reduced financial allocations. Whilst the IJB is not in a positive
financial position, further reductions of service in the community has
the potential to create cost pressures in other parts of the system 
•  NHS Ayrshire and Arran continue to meet the increased costs of
energy, e-health and all drugs (including primary care prescribing) in
line with the approved integration scheme (see paragraph 74 below). 
The IJB holds the budget for mental health services and addictions
prescribing
• In relation to the set aside budget, the monitoring of large hospital
activity is complex and requires significant work to be undertaken to
monitor budgets and changes in activity levels (see paragraph 75
below)
• The Integration Scheme for North Ayrshire IJB was last updated in
2018.  There is a legal duty on councils and health boards to review
the Integration Schemes at least every 5 years to consider whether
111

Page 112

Wider scope and Best Value audit | 23 
any changes are necessary or desirable.  The Integration Scheme is
being reviewed on a Pan Ayrshire basis and will be taken to
respective governance boards in 2026.
Work to rebalance the financial risk between the
Integration Joint Boards and the Health Board in some
areas remains ongoing
74.  NHS Ayrshire and Arran currently meet the increased costs of
energy, e-health and all drugs (including primary care prescribing).  The
IJB holds the budget for mental health services and addictions prescribing.
The integration scheme sets out the position in relation to primary care
prescribing, however the scheme also requires that in relation to the set
aside budget, the IJBs should contribute financially if they are responsible
for increased use and risk sharing in these areas.
75.  In 2023/24 we reported that Ayrshire Finance Leads have now
developed and agreed on a new model for costing the set aside
arrangements, based on actual bed usage and average costs which was
expected to be enacted operationally during 2024/25.  However NHS
Ayrshire and Arran has also requested the development of a joint strategic
commissioning plan to enable the setting of directions for Unscheduled
Care, aligned with the Set Aside resources, which has not yet been
approved by the three IJBs. 
76.  We previously reported that during 2023/24, a Task Group relating
to Primary Care Prescribing and led by the Health Board’s Director of
Finance, agreed in principle that whilst IJBs should hold full responsibility
for Primary Care Prescribing, a prudent approach would be to undertake a
period of learning to enable chief officers and funding partners to fully
understand the implications of such a decision.  We are now advised that
the transfer of responsibility of primary care prescribing would require all
parties to the integration schemes to agree to this change (council and
health board) and for due diligence to establish if the service is
appropriately funded.  
Vision, Leadership and Governance 
Governance arrangements are appropriate and operate
effectively 
77.  The audit work performed on the arrangements the IJB has in
place around its Vision, Leadership and Governance found that these
were effective and appropriate. 
78.  There continues to be an increasing focus on demonstrating the
best use of public money. Openness and transparency in how a body
112

Page 113

Wider scope and Best Value audit | 24 
operates and makes decisions is key to supporting understanding and
scrutiny. Transparency means that the public has access to
understandable, relevant, and timely information about how the body is
taking decisions and using resources. 
79.  For 2024/25 the IJB held its meetings in person. The meeting
papers and minutes are available on the IJB’s website.  All Performance
and Audit Committee meetings continued to be held remotely.    
80.  We consider that governance arrangements are appropriate and
generally support effective scrutiny, challenge and decision-making.   The
IJB has a clear strategic vision that is supported by its partners 
81.  The Public Bodies (Joint Working) (Scotland) Act 2014 requires
the IJB to prepare a strategic plan that sets out the arrangements in place
to carry out the integration functions over the period of the plan. The Act
also requires that the plan set out how those arrangements are intended to
achieve, or contribute to achieving, the national health and wellbeing
outcomes. 
82.  To support the IJB in achieving these responsibilities, it has
established a clear strategic vision as set out in its “Caring Together
“Strategic Plan 2022-2030. The plan contains five strategic
objectives/priorities:  
• Enable communities 
• Develop and support workforce 
• Provide early and effective support 
• Improve mental and physical health and wellbeing 
• Tackle inequalities 
83.  The IJB provides services as set out in its Integration Scheme.
The Strategic Plan objectives aim to give direction to the services provided
and commissioned by the IJB and are based on its engagement with its
partners and other key stakeholders together with consideration of
national outcomes.  The current Strategic Plan has no links to financial
plans.
84.  In 2022/23 we reported that the IJB was to refresh the Strategic
Plan in 2024 to ensure it is relevant and up to date. That review is now
underway and includes the development of a new action plan together
with a refresh of the main document to bring this in line with the current
landscape. It is proposed to present the updated document to the IJB in
December 2025. 
113

Page 114

Wider scope and Best Value audit | 25 
A review of the Integration Scheme is ongoing and is due
to conclude  in 2026 
85.  The Public Bodies (Joint Working) (Scotland) 2014, places a legal
duty on Councils and Health Boards to review the Integration Schemes at
least once every five years to consider whether any changes are
necessary or desirable. 
86.  As set out at para 71 above, the Integration Scheme for the IJB
was last reviewed in 2018. The current review of the Integration Scheme
has been undertaken on a pan-Ayrshire basis by the three Councils and
the Health Board to ensure a consistent and co-ordinated approach. A
project Board was established to oversee the work and various work
groups were established. The review of the Integration Scheme through
the various workgroups concluded in March 2024. Further work has since
been undertaken to consider specific issues and the overall legal
competence of the Scheme.
87.  It is anticipated that the Integration Scheme review will conclude in
2026. Following this, it will require approval by North Ayrshire Council and
NHS Ayrshire and Arran, prior to submission to the Scottish Ministers.
Use of Resources to Improve Outcomes 
Performance management arrangements are effective.  Of
the 18 national indicators, 16 (89%) either achieved or
were above target for 2024/25.  However delayed
discharges have increased by more than 61% over the
same period 
88.  The Performance and Audit Committee has a role in providing
oversight of performance reporting against the strategic plan. Twelve
month rolling performance reports are presented to most meetings of the
committee. This provides assurance to the Performance and Audit
Committee of overall performance.
89.  There are local indicators used for performance reporting by the
IJB, however for comparability when assessing the performance of the
IJB, we have considered several key Ministerial Strategic Group for Health
and Community Care (MSGHCC) measures that are used to track
performance in Integration Authorities. 
90.  Of the 16 local indicators used, 14 out of 16 (87.5%) either
achieved or were above target.  Exhibit 6 sets out the IJB’s results against
a number of the MSG measures for 2024/25 .  Of the 18 indicators, 16
(89%) either achieved or were above target.  However delayed discharges
114

Page 115

Wider scope and Best Value audit | 26 
bed days  increased from 1,785 during March 2024 to 2,876 during March
2025, an increase of 61.1%.
91.  Delays in accessing Care at Home supports are largely due to
overall capacity to deliver services. As part of the IJB’s financial recovery
plan for 2024/25, which has continued into 2025/26, a recruitment freeze
was implemented to reduce the overspend.  This has resulted in a
reduction in the overall workforce and an overall reduction in service
capacity.  The service has developed a Winter Preparedness and Delayed
Discharge Improvement Plan with a key focus on supporting Care at
Home Capacity.  However with a reduction in service capacity, an
increased focus on early discharge from hospital and a sickness absence
rate of over 14% in the Care at Home workforce, improvement in this area
is unlikely without radical reform.  Current initiatives include
implementation of a call monitoring system, a review of roles, prioritisation
of access including reviews of eligibility criteria.
Exhibit 6
National performance measures (age 18+)  
Measures   24/25 performance   Improving from 23/24 
Emergency admissions to
acute hospitals  9.1% decrease  Yes 
Unscheduled “hospital bed
days” in acute hospital  40.8% decrease  Yes 
Unscheduled “hospital bed
days” in geriatric long stay 68.3% decrease Yes
Emergency department
attendances 0.5% increase No
Delayed transfers of care bed
days (all)  61.1% increase   No  
Source: North Ayrshire IJB - Annual Performance Report 2024-25 
92.  Whilst there is a need for caution when drawing conclusion from
national comparisons, the Accounts Commission’s Integration Joint
Boards: Finance and Performance 2024 report makes it clear that IJB’s
need to make best use of available data. This needs to include effective
data sharing between partners and key stakeholders. To that end, it is
important that members and management of North Ayrshire IJB satisfy
themselves that the performance results of it are fully assessed on a
continual basis and that these results are used to effectively inform how to
improve outcomes for people who use its services.
93.  We conclude that the IJB has established appropriate
arrangements for reporting performance against national outcomes
through the Annual Performance report. 
115

Page 116

Wider scope and Best Value audit | 27 
A formal review should be undertaken to demonstrate
how the IJB is achieving Best Value 
94.      The Code of Audit Practice requires us to consider the
adequacy of the arrangements in place to demonstrate how the IJB meets
its Best Value duty to secure continuous improvement in the performance
of its functions.  We expect bodies to demonstrate that they meet the
expectations in the Scottish Government, Local Government in Scotland
Act 2003 Best Value: Revised Statutory Guidance 2020.  
95.  Our work on the four wider scope audit areas financial
management, financial sustainability, vision, leadership and governance
and the use of resources to improve outcomes provides evidence of how
the IJB performs in some important areas of Best Value.  Whilst there is
evidence of elements of Best Value being demonstrated by the IJB across
a range of areas, the mechanism for formally reviewing and reporting on
the arrangements to secure Best Value is not formalised and reported to
the Board.    
Recommendation 2:  A Best Value assurance framework should be
formalised, to set out how annual assurances from the IJB’s partners
can be used to provide assurance on Best Value arrangements to the
Board.
116

Page 117

Appendix 1 | 28 
Appendix 1
Action plan 2024/25
2024/25 recommendations
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing   
1. Financial sustainability
There are no approved plans to meet
the budget gaps set out in the MTFO.
This needs to be addressed as a
matter of urgency. 
An effective long term financial
recovery plan needs to be introduced,
and decisions about the way services
are delivered in the short, medium
and longer-term based on information
about the cost, impact and quality of
all available options. Detailed scenario
planning should also be undertaken to
provide an understanding for the IJB
of the effects of various reform
options.
Risk: There is a risk that the IJB is
unable to deliver the transformational
change at the pace that is required.
The Chief Officer,
Joint Board
members and the
Finance Working
Group need to
produce a financial
plan that
demonstrates how
efficiencies from
service reform , cost
base reductions and
transformation will
meet the budget
gaps outlined in the
MTFO.  Progress
should be reviewed
and challenged by
the board. 
(paragraph 70)
Accepted 
Preparation for the 2026/27
budget has commenced. The
Transformation Plan is being
further developed with a
focus on aligning financial
impact to areas of service
change.  A series of meetings
is being held with every
senior manager to review
their services and look at
ways of reducing spend
through either redesign or
cessation of services.  Once
completed the actions
identified will be discussed at
the Finance Working Group
prior to proposals being
presented to the IJB for
approval.  Proposals will be
submitted throughout
2025/26 e.g Brighter
Pathways will be presented in
November 2025.  Final
proposals to bridge any
remaining gap will be
presented in March 2026 as
part of the 2026/27 budget
paper. This work will also
include savings beyond
2026/27.
Chief Officer and Chief
Finance Officer
March 2026
117

Page 118

Appendix 1 | 29 
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
2. Arrangements to secure Best
Value
Whilst there is evidence of elements
of Best Value being demonstrated by
the IJB across a range of areas, the
mechanism for formally reviewing and
reporting on the arrangements to
secure Best Value is not formalised
and reported to the Board.
Risk: The is a risk that the IJB is not
meeting its Best Value duty to secure
continuous improvement in the
performance of its functions.
A formal review of
the Best Value
assurance
framework and an
assessment of the
partnership’s Best
Value arrangements
should be completed
and reported to the
Joint Board.
(paragraph 95)
Accepted 
A Best Value framework will
be developed and presented
to the IJB, thereafter this will
be incorporated into the
Annual Performance Report
as the mechanism for regular
reporting to the IJB. 
Chief Officer
February 2026 
118

Page 119

Appendix 2 | 30 
Appendix 2
Follow-up of prior year recommendations in the 2023/24 Annual
Audit Report
Issue/Risk Recommendation
Agreed management
action/timing 
PY1. Financial management   
Financial monitoring report
projections during the year varied
significantly from actual outturn.
Financial projections
should be based on clear
evidence and realistic
assumptions.
Complete
The projection for Care at
Home costs in 2023/24 was
understated due to an error in
the forecasting template. This
was explained to the IJB at
the June meeting and was
rectified for 2024/25.
PY2.  Unidentified savings 
At the end of Month 4 (July
2024), the IJB reported a
projected year-end overspend of
£6.697m. Identified financial
improvement actions amount to
£3.702m, A further £2.995m of
financial recovery improvement
actions still require to be
identified.  
The IJB should ensure
that savings plans are
developed as a matter of
urgency, identifying how
the required £2.995
million of financial
recovery improvement
actions in 2024/25 will be
achieved.
Ongoing 
The IJB set a balanced
budget for 2024/25 on 14
March 2024. This did not
require any draw on reserves
but did include the approval
of £10.290 million of savings
to achieve financial balance.   
The 2005/26 budget has a
funding gap of £3.069 million
and proposed savings of
£4.019 million.  
119

Page 120

Appendix 2 | 31 
Issue/Risk Recommendation
Agreed management
action/timing 
PY 3. Uncommitted reserves   
The IJB Reserves Strategy
recommends that the IJB will
aspire to hold between 2 and 4%
of its annual budgeted
expenditure as an uncommitted
reserve. The uncommitted
reserve balance at 31 March
2024 was £0.357 million
(representing only 0.1% of the
IJB’S 2024/25 budget)  and
therefore does not meet the lower
target.  In addition, uncommitted
reserves are forecast to be
depleted by 31 March 2025. 
The IJB must urgently 
map a clear route to bring
uncommitted reserves
back up to the minimum
level. 
Ongoing. 
At 31 March 2025, the IJB
had zero uncommitted
reserves balance against the
target level for the year of
£6.715 - £13.430 million. 
The absence of any
uncommitted general fund
reserves seriously limits the
IJB’s ability to manage and
mitigate future financial
pressures and represents a
significant financial risk to
both the IJB and its partners. 
The IJB accepts and
acknowledge that
uncommitted reserves require
to be restored to the
minimum recommended
level.  However it also reports
in the Annual Accounts that
in the short-term, service
pressures mean that this will 
not be achievable. This will
require to be considered as
part of the annual budget
setting process alongside the
funding allocations from both
partner bodies.   
120

Page 121

Appendix 2 | 32 
Issue/Risk Recommendation
Agreed management
action/timing 
PY B/F 1.  Transformation Plan
(2022/23 recommendation) 
The IJB needs to be clearer
about how the ongoing
improvement activity makes a
difference to the outcomes the
IJB and its partners want to
achieve. 
The IJB and its partners
need to clearly set out
what achieving its
intended outcomes looks
like in the short, medium
and longer term.
Superseded 
Based on current projections,
projected savings from
transformation are not
enough to close the potential
budget gaps in 2026/27 and
2027/28.  Financial recovery
from this position will require
radical reform of services and
service/cost reductions.  In
the absence of any
contingency reserve of its
own, this presents a
significant financial risk to
both the IJB and its partners. 
An effective long term
financial recovery plan needs
to be introduced, and
decisions about the way
services are delivered in the
short, medium and longer-
term based on information
about the cost, impact and
quality of all available
options. Detailed scenario
planning should also be
undertaken to provide an
understanding for the IJB of
the effects of various reform
options. 
See Recommendation 1 of
our 2024/25 action plan. 
121

Page 122

Appendix 3 | 33 
Appendix 3
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2024/25 15 May 2024
Scotland’s colleges 2024 19 September 2024
Integration Joint Boards: Finance and performance 2024 25 July 2024
The National Fraud Initiative in Scotland 2024 15 August 2024
Transformation in councils  1 October 2024
Alcohol and drug services 31 October 2024
Fiscal sustainability and reform in Scotland  21 November 2024
Public service reform in Scotland: how do we turn rhetoric
into reality?
26 November 2024
NHS in Scotland 2024: Finance and performance 3 December 2024
Auditing climate change 7 January 2025
Local government in Scotland: Financial bulletin 2023/24 28 January 2025
Transparency, transformation and the sustainability of council
services
28 January 2025
Sustainable transport  30 January 2025
A review of Housing Benefit overpayments 2018/19 to 2021/22:
A thematic study
20 February 2025
Additional support for learning 27 February 2025
Integration Joint Boards: Finance bulletin 2023/24 6 March 2025
Integration Joint Boards finances continue to be precarious 6 March 2025
General practise: Progress since the 2018 General Medical
Services contract
27 March 2025
Council Tax rises in Scotland 28 March 2025
122

Page 123

North Ayrshire Integration Joint
Board
2024/25 Annual Audit Report 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
123

Page 124

1
2
IJ B Budget Position:
Critical Pressures and Risks for
2025/26
Chief Officers Update -5th March
2025
• Estimated financial gap of
£562.4m -to stand still
• Average of 5.35% with gaps
ranging from 1.97% to 11.39% BOO%
12.00%
10.00%
• Pressures across the system 6.00%
Finanical Gap as Percentage of Budget
including
• Prescribing
• Demand :: I ii0.00% I I I I I I I I
• Pay Pressures
• Contract Inflation
• National Insurance
(potential underestimate)
OFFICIAL
HEALTH AND SOCIAL CARE
SCOTLAND
IJB CFO SECTION
I I I I I
1
Appendix 2
124

Page 125

Financial Sustainability - Worsening Position
• Depleted reserves - majority {55%) with no Contingency Reserve as Percentage of Budget Against Best Practice
Range
contingency reserve 4.50%
• Best practice contingency reserves - held at •.00%
2 to 4% of revenue budget ,.s0%
• Total contingency reserve balance held is ,.a0%
£59.4m or 0.46% of total funding {£183m in
2
.s0%
2.00%
22/23) 1.50%
• Financial recovery measures have been 1.00%
required exposing Partners to financial risk-u:s0%
inc impact on LG reserves 0.00%
• Significant financial gaps to be met to hold
our current position
• IJB Financial position routinely shared -
locally, CFO network, monthly returns SG
3
• Different funding mechanism to other LA and NHS
I
• In-year funding allocations -not kept pace with inflation or policy
intent
4
• Reductions to recent allocations -eg Mental Health Outcomes
Framework, Multi Disciplinary Teams, Mental Health Officers
• Core Funding from 2023/24:
IJB Funding I
2023/24 - £95m + 2% NHS NRAC
Real Living Wage I
Free Personal Care I
Interim Care Ending I
2024125 - £241.5m - + 0% NHS NRAC
Real Living Wage I
Free Personal Care I
2025/26 - £140m + 3% NHS NRAC
Real Living Wage I
Free Personal Care I
Short Breaks Unpaid Carers I
£m
100
15
-20
230
11.5
125
10
5
• SG Directive to pass through
baseline plus additional funding
- set the bar for funding
allocations
I II I I I
� :iii � &� i, ,; � � f � i :a � • :c !1 I § .ll ir
0
'§ w
i" /l!
3. Financial performance
The financial health of IJBs continues to weaken and th,
are indications of more challenging times ahead
US funding has decreased in real terms compared to
2021/22
30. UBs recer,;e ther nnfng as enooall', agreed cootrb..rnons from their
OOln:llandNHSboal-dpart11ers. Funiingl:!llargeiyreceMldtcco.er
ill-yes expenotlJre on prtMdrng serw:es but can ajso be 1eceived for
specific services and natlOrllll nrtlalM!S ID be hn:iBd Ill future yt!,lr5.
31. Furdng to UBs n 2022ll3 decreased by f'l.1 billion (rx1e p(!f cent]
n real terms 1D fllD bilui; a £342 mdkJn decreasa rn cash rerms
Exhibit 2. UBs recer.oed Cl.O blion d adiinonal fining fl 202"1/22
1Csiffl(Jllthe1r1�toiheCo,,d-.19panderT»c_ b:dudngthe
2021/22 Covd-19 related fundng. this 500,'IIS an under!yITTg decrease of
£68 mifiron n real terms, represantJng a 1.0 per cent decrease
Exhibit 2.
Real terms movement in IJB funding
2020/21 2021122 2022123
■ Partner funding (real terms) ■ Covid-19 funding (real terms}
2 125

Page 126

5
6
Trend in NHSScotland expenditure, 2012/13 to 2022/23
5,000,000
4,500,000
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
£11 _
£10
£9
£8
£7
£6
£5
£4
£3
£2
£1
£0
Financial year
-Hospital Sector (cash terms) -community Sector (cash terms)
-Family Health Sector (cash terms) -Resource Transfer (cash terms)
--Total Operating Costs (cash terms) -Total Operating Costs (real terms)
"'
-8.
"'
.a
"
• Disproportionate
balance of
funding between
hospital sector
• Principles of
Integration to Shift
the Balance of
Care
LFR Data - Gross Expenditure net of customer and client receipts
income • Increasing cost across adult social care
client groups
Ill
Older persons
(aged 65+)
••• 111 • ••
Adults with Adults with Adults with
physical or learning mental health
sensory disabilities (aged needs (aged 18-
disabilities (aged 18-64) 64)
18-64)
■ 2021/22 ■ 2022/23 ■ 2023/24
---
Adults with other Total Adult Social
needs {aged 18- care
64)
• 17% Increase in two years, with
variation across client groups from
14%to 46%
Client group
Older persons (aged 65+)
Adults with physical or sensory disabilities (aged
18-64)
Adults with learning disabilities (aged 18-64)
Adults with mental health needs (aged 18-64)
Adults with other needs (aged 18-64)
Total Adult Social Care
% Increase from
2021/22 to
2023/24
14%
19%
20%
16%
46%
17%
3 126

Page 127

7
8
Legacy Overspends -
Including debt
repayment
requirements
Performance
expectations -
Maintain and improve
Meeting the needs of
population with rising
costs of care
4,990 community
hospital beds
18,135 care home
beds
External cost
pressures E.g.
Prescribing
National Insurance
SG Policy
commitments not
fully funded &
reducing or ceasing
Budget settlement -
timing and quantum
Provider market and
cost pressures -
provider of last resort
Wider system
financial challenges -
inc LG, NHS and care
market
Integration Scheme
Reviews -risk share
& dispute resolution
€)
11,585 Band 5 nurses
48.8 million less
items
420,300 weekly
homecare hours
Annual running
cost
NHS '= ti "" ,1
Borders
Current waits:
• Delayed
Discharges-
1,921
• Community
CAH people -
2,951
• CAH overall -
33,700hrs
• Assessment -
6,487
4 127

Page 128

9
Social Care Provider Sustainability
• Live examples of provider concerns:
Supported Accommodation
Provider-refused 7 .24%
uplift 24/25 -served notice
on residents
Providers pullmg out of
md1v1dual areas or across
Scotland (eg from
Community Support)
Homecare Association
seekmg £32.88 an hour­
well above average
Higher than mflat1on and
SLW increases for contracts -
eg Scotland Excel Children's
Residential Framework
Impact of eNIC "the
consequences of not
exempting all public service
providers of social care from
the additional eNIC l1ab1lit1es
will be catastrophic"
Community Support Provider
hand back small Poe-eg 30
SUs by 31 March 25% of
presence m an area
Cost of Care for Complex
needs-Coming Home
Agenda not progressing
• Costed models -eg NCHC and hourly rates for
community support -we will NEED to fund full NI
cost for providers with zero IJB funding
• Unfunded cost increases = commission and deliver
less - for NCHC adds 2.2% to rate (circa 805 beds)
• Circa 89% of care home beds are not publicly
operated
• HSCPs are providers of last resort -generally in-house
is more expensive
• Do not have BCP/contingency plans/capacity to
mitigate impact of widespread provider failure
• Negative impact on social care workforce
2025/26:
Openin deficit £3.?m
Budget pressures - pay, inflation & demographics £16.0m
SG Funding (eg NRAC uplift, SLW, FPNC (£7.9m)
Council additional fundin £4.0m
Estimated Budget Ga (exc repayment) £7.Sm
Impact areas:
• Care at home - align with budget - £2.Sm overspend circa
100 average packages of care
• Care Homes - flm saving= 36 care home placements 5%
reduction -67% residents now access from hospital
• Capping access to non-residential care & review non­
personal care (misalignment SDS)
• Social Care Non Residential Charges -range 5% to 25%
increase 25/26
• Cease Early Intervention Services - community health and
wellbeing programmes
• Financial Inclusion Service -remove universal access
• Community waits & risk- over 80% waiting outwith
hospital
Delayed Discharges
Care at Home - projecting £3.3m
overspend, reduced to £2.Sm at Dec
Spend £m
2019/20 £20. 7m
2024/25 £33.3m
Increase
SG Capacity Funding
2021/22
£12.6m
£3.4m
110
100
90
80
70
60
50
40
30
20
10
Financial Recovery Plan
--TOTAL -CRAG Target
10
5 128

Page 129

11
12
Financial Sustainability
Other high risk -!&,ASP, carer
breakdown, palllatfve care,
Intensive personal care/moving
and handling
All other community
Prevention of admission, risk
management, supporting
hospital discharge
.tigcw.Ji� and discharge
without delay
Safe care delivery
Reablement
support and
early
intervention
Links with National Priorities & Policy Directives
BY FOCUSSING ON TOP OF PYRAMID - REDUCTION IN CARE
• Delayed Discharge mission and Unscheduled Care improvement plans
• Homefirst-community based care is expensive
• Self Directed Support-remove choice, control and flexibility
• Carers Act-impact on Carers and cared-for
• The Promise -early intervention impact
• Coming Home Implementation -resource to support discharge and choice based on
affordability
• Planning with People guidance and best practice
6 129

Page 130

13
• Risk - Will unpick positive
progress already made
through Integration
7 130

Page 131

NORTH AYRSHIRE COUNCIL
30 September 2025
Cabinet
Title: Local Housing Strategy 2023–2028: 2024/25 Progress
Update
Purpose: To provide Cabinet with an annual update on progress of
the Local Housing Strategy 2023-2028 and to seek
approval for the update to be submitted to Scottish
Government.
Recommendation(s): It is proposed that Cabinet: (i) notes the content of this
report and progress against the LHS Action Plan, with
further details provided in Appendix 1; (ii) approves the
addition of the three new actions outlined at para 2.48, with
further details provided in Appendix 1; and (iii) approves
submission of the LHS update to the Scottish Government.
1. Executive Summary
1.1. The Housing (Scotland) Act 2001 places a statutory duty on local authorities to
produce a Local Housing Strategy that sets out its strategy, priorities, and plans
for the delivery of housing and related services. 
1.2. The North Ayrshire Local Housing Strategy 2023–2028 was approved by Cabinet
on 13 June 2023 and sets out the strategic priorities for tackling housing issues
in the area during the five-year period. 
1.3. The Local Housing Strategy enables the Council to monitor progress against
national and local priorities. It is a statutory requirement for a Local Housing
Strategy to be kept under review; the Scottish Government expects all local
authorities to review and report on progress annually. 
1.4. This report provides an overview on progress made to 31 March 2025 on the
delivery of the Local Housing Strategy 2023-2028. 
1.5. Cabinet is invited to note the contents of the report; approve the addition of the
three new actions outlined at para 2.48, with further details provided in
Appendix 1; and approve submission of the LHS update 2024/25 to the
Scottish Government. 
2. Background 
2.1. The Housing (Scotland) Act 2001 sets out local authorities’ duties to prepare a
Local Housing Strategy which details the Council’s strategy, priorities, and plans
for the delivery of housing and related services. The 2001 Act states that the
Local Housing Strategy must be: 
• supported by an assessment of housing provision, including the need and
demand for housing-related services;
Agenda Item 5
131

Page 132

• submitted to Scottish Ministers; and
• kept under review by the Council. 
2.2. The Scottish Government expects all local authorities to review and report on
progress annually. 
2.3. The North Ayrshire Local Housing Strategy 2023-2028 was approved by Cabinet
on 13 June 2023 and sets out the strategic ambition for Housing in North
Ayrshire: “we want all our people to live in the right homes, in great places, with
access to any support services they need”. Four overarching outcomes were
developed to achieve this ambition, which align to our Council Plan and the four
key strategies in the Scottish Government’s ‘Housing to 2040’ vision: 
• Outcome 1: More homes at the heart of great places – Our places
support thriving and inclusive communities; 
• Outcome 2: Affordability and choice – Our people have affordable
homes in the places they choose to live; 
• Outcome 3: Affordable warmth and zero emissions – Our homes are
energy efficient and release less emissions; 
• Outcome 4: Improving the Quality of our Homes – Our homes are in
good condition and people can access any support services they need. 
Achievements to Date 
2.4. To measure the outcomes of the Local Housing Strategy 2023-28 an action plan
was developed (see Appendix 1), with 42 actions each having their own desired
outcome and targeted completion date. The strategy is now in its second year of
implementation and there have been a number of successes within the action
plan to date. These are grouped under each of the approved LHS outcomes
noted at paragraph 2.3: 
Outcome 1 – More homes at the heart of great places 
2.5. The Local Housing Strategy aims to support the Council’s Community Wealth
Building approach and Regeneration Delivery Plan to make our area more
successful for everyone, improving our places, establishing thriving town
centres, supporting health and well-being, and providing more opportunities for
a better quality of life. Housing can make a strong contribution to regeneration
by contributing to positive health outcomes and supporting a sense of
community. During 2024/25 the Council utilised its role as a major house
builder in North Ayrshire to maximise local employment and training
opportunities. For example, two modern apprentices and a graduate apprentice
have been employed at the Council’s Garnock Academy site. The contractor
has also delivered a number of employability and career sessions for school
children via the Council’s Employability team. 
132

Page 133

2.6. A total of 91 new homes were delivered during 2024/25 by the Council and our
Registered Social Landlord (RSL) partners, as follows: 
Development Number
of Homes
Additional Comments
St Mary’s Gardens, Largs 26 This development replaced the former St
Mary's Primary School
Stanecastle, Irvine 18 This development replaced the former
Stanecastle Primary School
James McFarlane,
Ardrossan
17 This development replaced the former
James McFarlane Primary School
Laburnum Avenue, Beith 7 Housing regeneration project
Newhouse Drive, Kilbirnie 3 Housing regeneration project
Garven Road, Stevenston 20 CHA development 
2.7. The Council’s new build project at Stanecastle, Irvine (29 homes, 31 units)
concluded during April 2025. The Newhouse Drive, Kilbirnie (7 units) and
James McFarlane, Ardrossan (19 units) Council projects concluded during May
2025. 
2.8. In addition, works are currently underway at the following new Council
developments: 
• Ayrshire Central Hospital, Irvine (202 units)
• Garnock Academy, Kilbirnie (50 units)
• King’s Arms, Irvine (6 units) 
2.9. The Council developments listed above contribute to the Council’s latest
commitment to deliver 1,643 new homes. The Strategic Housing Investment
Plan (SHIP) 2025-2030, approved by Cabinet on 3 December 2024, sets out
the Council and its partners commitment to deliver new affordable homes in
North Ayrshire, supporting the Scottish Government’s target to deliver 110,000
new affordable homes by 2032. The revised SHIP 2026-2031 will be presented
to Cabinet on 28 October 2025. 
2.10. Private developers delivered 280 new homes during 2024/25 at active sites,
bringing the number of units delivered by the private sector to 528 since April
2023. Development is underway at all five new sites allocated by LDP2, which
together will deliver over 1,000 private sector homes in addition to other active
sites including Montgomerie Park and West Byrehill. Planning Services
submitted the Draft Delivery Programme to Scottish Government on 8 April
2025 - setting out actions required to deliver sites within the housing land
supply - and are progressing towards finalising the 2025/26 Housing Land Audit
and Delivery Programme, which will be published following its approval
alongside the LDP Evidence Report. 
Outcome 2 – Affordability and choice 
133

Page 134

2.11. The Scottish housing system is under significant pressure, with the Scottish
Government having declared a national Housing Emergency on 15 May 2024
and 13 local authorities having declared their own housing emergencies due to
the unprecedented pressure to meet their statutory responsibilities towards
homeless people and other priority groups in housing need. On 2 September
2025, the Scottish Government published its Housing Emergency Action Plan,
with three main areas of focus: 
• Ending children living in unsuitable accommodation.
• Supporting the housing needs of vulnerable communities; and
• Building our future - maximising investment in Scotland’s housing sector. 
Whilst there is increasing pressure on the North Ayrshire housing system, a
range of effective measures are underway, including increasing housing supply,
and managing the demand from homeless people by way of temporary and
permanent accommodation. Details of the housing development programme
and homelessness prevention achievements to date, and further work planned
during 2025/26 are outlined elsewhere in this report. 
2.12. North Ayrshire Council established the Arran Housing Task Force (AHTF) in
2022 to quantify demand for affordable housing on Arran and identify issues
that may be limiting economic growth. A quantitative study was undertaken to
determine affordable housing demand on the island, recognising the assessed
housing demand information from the North Ayrshire Housing Register and
community feedback. Following the study, the AHTF recognised areas that
required further analysis, and the Arran Housing Survey was developed and
launched on 31 January 2025. The survey looked for responses from Arran
households, employees/employers on the island, landlords, second
homeowners, empty homeowners, short-term let owners, and those wishing to
move to the island, to help shape future housing provision on the island.
Following the survey’s closure on 14 April 2025, the results are currently being
analysed by the Council’s Housing Strategy Team and will be presented to the
AHTF in late 2025. The survey report will require formal sign off by the AHTF
and will be published thereafter, with the AHTF action plan amended to reflect
the outcomes. The AHTF membership includes the Scottish Government,
Highlands and Islands Enterprise, local community groups, and Arran
registered social landlords. 
2.13. When the Rapid Rehousing Transition Plan (RRTP) was implemented in 2019,
a target was set for North Ayrshire to create 100 Housing First tenancies over a
five-year period. At end of 2023/24, we had exceeded the target by creating
103 tenancies and by the end of 2024/25 we have successfully created 123
tenancies. Within current budget constraints, we plan to create a further 20
tenancies per annum over the next four years. 
2.14. The Private Sector Advice and Homelessness teams are piloting an approach
where a homeless presentation is due to the tenant being served a Notice to
Leave by their landlord. The Private Sector Advice team contact the landlord to
either mediate or encourage the landlord to use our landlord-to-landlord sales
service with the intention that the tenant can remain in the property. The pilot
134

Page 135

outcomes will be reviewed with the expectation that the service can be further
evolved to ensure we are supporting private tenants within our communities. 
2.15. It is recognised that purchasing ex-local authority stock is an effective way to
increase social housing stock and provide value for money for the investment
made - the current SHIP 2025-2030 has increased the Council’s buyback
scheme to 60 properties by 2030. The Council’s developing Registered Social
Landlord partners have buyback programmes within the SHIP, aiming to
acquire a further 29 new homes. Due to current housing market conditions, it
has been more challenging to acquire homes that are marketed for sale. As a
result, a new Housing Acquisition Strategy is under preparation (see LHS
Action 32) and will be presented to Cabinet during 2025/26, to identify
potentially new and innovative approaches, ensure that the Council continues
to meet housing need across North Ayrshire, funding is maximised and value
for money is demonstrated across the various funding streams. 
2.16. During 2024/25 Trust Housing Association acquired two homes on Arran
through the Rural Affordable Homes for Key Workers Fund, which is available
until 2028. The Council and RSLs continue to work in partnership to identify
suitable properties that can be bought back using the Rural Affordable Homes
for Key Workers Fund, to increase the affordable housing stock available on
our islands.  
2.17. The ‘Housing and Care Leaver Protocol’ sets out how North Ayrshire HSCP
and Housing Services will work together to achieve the best possible housing
outcomes for care leavers. The protocol has recently been reviewed and
enhancements made, as part of the Brighter Pathways programme. Senior
Housing Officers will continue to carry out enhanced housing options interviews
with care leavers to ensure their housing needs are met and they are supported
to sustain their tenancies. Between April 2024 and March 2025, secure
tenancies were allocated to 14 North Ayrshire care leavers. 
Outcome 3 – Affordable warmth and zero emissions 
2.18. At the design and planning stage for each new build Council development
identified in the SHIP, an options appraisal is carried out to determine the most
appropriate sustainability measures required to reduce fuel poverty for tenants,
as well as contributing towards the Council’s net zero target. 
2.19. Our most recent developments incorporate air source heat pumps alongside
enhanced fabric measures and solar PV panels. An assessment was carried
out for each site and measured to ensure property running costs were
affordable for our tenants while contributing to our net zero target. 
2.20. As part of the capital programme for investment for existing stock, solar PV and
external wall insulation has been included in the re-roofing and re-rendering
measured term contracts where appropriate, to ensure tenants benefit from a
better insulated home, reduced heat loss and the ability to utilise solar panels to
reduce utility bills. 
135

Page 136

2.21. North Ayrshire Council responded to Scottish Government’s consultation on the
new and emerging Social Housing Net Zero Standard (SHNZS) in February
2024. The new standard is likely to require increased fabric performance and
replacement of ‘polluting’ heating systems with ‘clean’ heating systems in our
housing stock. The proposals have significant implications for the Council’s
housing asset management approach and 30-year HRA Business Plan,
including cyclical replacement of heating systems and other fabric elements
e.g., window, roof, and insulation programmes. 
2.22. A pathfinder project is in progress to review the financial, technical and
customer implications associated with the emerging standard. The project
focuses on the traditional housing stock built between 1945 and 1960, which
makes up approximately 75% of the stock profile. The initial properties have
been surveyed; the appointed external architects (MAST) have issued their
recommendations and will agree a proposed scheme of works for each
property. A suitable contractor is currently being procured to provide monitoring
within the properties, with a budget of £0.550m allocated for this project. 
2.23. The Area Based Scheme (ABS) continues to deliver energy efficiency and low
carbon technology to private sector households, in hard-to-treat areas. During
2024/25 this targeted scheme was focused on improving affordable warmth in
island properties i.e. Arran and Great Cumbrae, whilst providing roof mounted
solar PV to properties in the Kilwinning area where ABS has previously been
used to install external wall insulation. 
2.24. Council officers has been working in partnership with Green Home Systems, an
Irvine based company, to access ECO4 Flex funding, and through this
partnership have installed 134 measures, such as ASHP, solar PV, loft, room in
roof, internal wall and cavity wall insulation, boiler upgrades, first time central
heating and TRVs, in 32 properties, generating over £0.900m of additional
funding into North Ayrshire. 
2.25. The Council offers Energy Smart emergency support payments for those
vulnerable to fuel debt, to support a reduction in fuel poverty.  Grants totalling
£0.123m were released during 2024/25. 
2.26. A comprehensive process map has been developed to ensure issues with
damp and mould are effectively addressed. The core elements of this process
have already been implemented and further elements, such as an expansion in
the use of electronic monitoring, are currently being explored. Tenant
engagement has been increased, with regular information provided via
corporate social media channels. These measures will ensure that the Council
is well prepared for the anticipated introduction of Awaab’s Law as part of the
forthcoming Housing (Scotland) Bill. 
Outcome 4 – Improving the quality of our homes 
2.27. The latest Housing Asset Management Plan (HAMP) was approved by Cabinet
in September 2023, and complements the Local Housing Strategy 2023-2028
approved by Cabinet in June 2023. The HAMP is currently being refreshed and
136

Page 137

will be presented to Cabinet on 28 October 2025. The HAMP aims to ensure
the Council’s housing stock is maintained in a condition compliant with existing
and proposed legislation and building standards. Progress on the action plan is
reported to the Housing Asset Management Board (HAMB) on a bi-monthly
basis to ensure appropriate governance mechanisms are in place to support
the delivery of the action plan. 
2.28. The Estate Based Regeneration Programme (EBRP) continues to deliver
projects to address pockets of low demand stock; antisocial behaviour; external
appearance; parking provision; road and footpath condition; fencing;
landscaping; and general grounds maintenance issues. During 2024/25,  there
has been successful delivery of an additional 16 new in-curtilage parking
spaces at NAC properties, rehoming of tenants and purchase of 3 properties to
allow future works to progress at low demand flatted blocks, external
improvement works at two blocks of amenity bungalows, major repair works to
a Housing owned footbridge, a significant fencing programme, and some
smaller improvement projects. 
2.29. The Sheltered Housing Reprovisioning Programme has delivered the
refurbishment of Barnett Court, Saltcoats, which was completed in January
2024 and works at Cheviot Court, Irvine, completed in November 2024. Work is
anticipated to commence at Vineburgh Court, Irvine and Laigh Court, Beith
during spring 2026. These two complexes will be supplied by a Bivalent heating
and hot water system, which is a combination of ASHP and a gas back-up.
Officers are currently preparing a heating strategy for the remainder of the
complexes on the programme. 
2.30. The Customer Participation Strategy 2023-28 was approved by Cabinet in June
2023. In 2024/25, membership within our Service Improvement Groups
increased, 25 consultations took place, and our tri-annual Tenant Satisfaction
Survey was conducted. The Redburn Grove Gypsy/ Travellers Tenants group
became a Registered Tenant Organisation. 
Areas of Future Focus 
2.31. Priorities that require further action, and will be implemented during the
remaining lifespan of the Local Housing Strategy 2023-2028, are as follows: 
Outcome 1 – More homes at the heart of great places 
2.32. As reported to Cabinet on 3 December 2024, in May 2024 Scottish Government
advised that the North Ayrshire Resource Planning Assumption (RPA) for
2024/25 would be significantly reduced compared to the funding level
previously indicated, with further reductions anticipated in later years. On 4
December 2024, Scottish Government announced a draft £768m budget for the
Affordable Housing Supply Programme, which reinstated the funding for
2025/26. 
2.33. The Council is currently in the process of developing the SHIP 2026-31,
including future Resource Planning Assumptions, pending formal notification of
137

Page 138

the 2026/27 North Ayrshire Resource Planning Assumption anticipated in
spring 2026. Officers are also working with external partners to explore
alternative and additional mechanisms to support affordable housing delivery. 
Outcome 2 – Affordability and choice 
2.34. A review of the North Ayrshire Common Housing Register (NAHR) Allocation
Policy has recently been completed to ensure that it aligns to emerging issues,
incorporating national and local priorities. Following consultation with
applicants, tenants, tenants’ groups, and key stakeholders, the NAHR partners
have successfully undertaken and concluded remodelling requirements to
assess the potential scale of impact for the proposed changes to the allocation
of housing. The draft North Ayrshire Housing Allocation Policy (NAHAP) has
been reviewed by NAHR partners and is scheduled to be presented to Cabinet
on 30 September 2025. 
2.35. North Ayrshire Council experienced increasing levels of homelessness and a
significant increase in demand for temporary accommodation in 2024/25,
putting additional pressure on general housing supply. The North Ayrshire
Homelessness Taskforce, comprising of the Council and a range of
stakeholders, provides the governance framework for the delivery of the North
Ayrshire Rapid Rehousing Transition Plan, inclusive of Housing First. The
partners are currently working to understand the homelessness risk factors
affecting each of the partner organisations with a role in homelessness
prevention in North Ayrshire. The findings from this work are being used to
develop the North Ayrshire Homelessness Strategy, aligned to the proposed
new homelessness prevention duties detailed within the Housing (Scotland) Bill
2024. 
2.36. Of the 1,184 homeless cases in 2024/25, 171 (14.4%) individuals reported to
be fleeing domestic violence in comparison with 133 in 2023/24. Of the 171,
142 (83%) were females. In early 2025, the Violence Against Women
Partnership was re-established, to bring relevant partners back together to
discuss individual and collective actions in response to national policy and local
challenges. This action was supported by confirmation of a new VAW Lead
Officer post which is currently being recruited. Development of the North
Ayrshire VAW Strategy and Action Plan will be aligned to the Delivering Equally
Safe National Strategy. 
2.37. Following the successful implementation of the Redburn Grove Tenants and
Residents Association (TARA), further engagement work and an associated
action plan requires to be developed to fully identify the needs and aspirations
of Gypsy Travellers, reflecting on feedback from the recent Gypsy/Traveller
Satisfaction Survey. This will not be isolated to Redburn Grove and will include
the management and engagement opportunities when dealing with
unauthorised encampments. 
2.38. On 3 June 2025, Cabinet approved the inclusion of the Redburn Grove
redevelopment within the Strategic Housing Investment Plan 2026-2031, which
will be considered by Cabinet on 30 September 2025.
138

Page 139

2.39. Housing Services are working to develop an inter-agency hospital discharge
pathway to minimise the risk of homelessness on discharge from hospital.
Through collaboration with partners, we are developing the pathway that will
recognise the proposed “Ask” and “Act” recommendations within the Housing
Bill. The pathway will promote partnership working and encourage early
intervention to prevent homelessness and ensure the housing needs of patients
are identified on admittance. 
2.40. Working in partnership with East and South Ayrshire Council, a prison
discharge outreach service is delivered from within HMP Prison Kilmarnock to
offer advice and assistance to those threatened with homelessness on release.
In addition, the North Ayrshire Homelessness Task Force has developed a
Prison Discharge Protocol aligned to the national ‘Sustainable Housing on
Release for Everyone’ (SHORE) standards, to minimise the risk of crisis for
people being released from prison. The protocol is currently being revised.
During 2024/25, 63 individuals approached for homeless assistance following
prison discharge, which accounts for 5.3% of all approaches. During 2023/24,
77 individuals were homeless following prison discharge, which accounted for
7% of all approaches.   
2.41. Further analysis is required to determine trends and areas for improvement in
relation to homelessness tenancy sustainment. In 2023/24 the average number
of weeks spent in temporary accommodation was 16.4 (115 days) for cases
closed. In 2024/25 this has decreased to 15.8 weeks (111 days). A review of
the Housing Allocation Policy and supporting practices is currently being
undertaken to ensure that the use of Council housing stock is optimised to meet
the needs of tenants and applicants. 
Outcome 3 – Affordable warmth and zero emissions 
2.42. The Social Housing Net Zero Standard (SHNZS) mentioned previously at
paragraph 2.21 is anticipated to be implemented during 2026, although the
exact implementation date has yet to be confirmed by Scottish Government.
Similar to many other local authorities and registered social landlords, the
Council’s 30-year HRA business plan is under significant pressure. Whilst an
increase in emission standards is expected and the HRA Business Plan
includes a budget allocation for energy efficient improvements and heating
systems replacement, it is recognised that this will not be sufficient to fully
retrofit our existing stock. 
2.43. In anticipation of the new SHNZS standards, the Council has appointed a
contractor to undertake a pathfinder project to fully understand the financial,
technical and tenant implications of complying with zero emissions targets. A
sample of properties have been identified to include a range of different
property types with tenant consultation underway. A whole house approach to
retrofit will be undertaken to implement a range of energy efficiency and
decarbonisation measures across Council housing stock to ensure legislative
requirements are met. The project will also consider dampness and mould to
inform the future approach in dealing with these issues, with a specific focus on
139

Page 140

the use of electronic monitoring. A report with findings and recommendations
will be prepared during 2025 for further consideration. 
Outcome 4 – Improving the quality of our homes 
2.44. Whilst The Council awaits the outcome of the Scottish Government consultation
on SHNZS, our Pathfinder project is underway and will see physical works
conducted during 2025 and 2026; this will inform the Council’s longer-term
strategy in relation to SHNZS. Alongside this, our Capital Programmes continue
to deliver improvements to our stock through investment in Solar PV/EWI and
upgraded central heating systems. Progress in this area will continue to be
reported through our regular Joint Budget Meetings, HAMB and Scottish
Government returns. 
2.45. Actions taken to improve access (e.g., an end-to-end process review; higher
application of the access policy; additional staff resources) have seen an
improvement in statutory compliance. In 2025/2026, the Council will continue its
statutory compliance delivery, similar to that used in 2024/2025 where we saw
increased utilisation of our forced access policy and increased financial
resources to create a dedicated compliance team. This saw substantial
improvement in both gas safety and Electrical Installation Condition Report
compliance, which we wish to sustain. 
2.46. A Housing Evidence Paper, prepared to inform the preparation of the LDP
Evidence Report, was published in December 2024 and reissued in March
2025 for stakeholder comments. The paper considers the requirement for a
target for the delivery of accessible homes within the private sector, noting that
the Government has committed to a new ‘Scottish Accessible Homes Standard’
which will be part of national building standards by 2025/26. The accessible
standard will see accessibility designed and built into all new homes, increasing
the housing choices for people with disabilities and reducing the need for
expensive retrofitting as people age or their needs change. The Council will
review our stakeholder comments and will complete the Evidence Report by
setting out the evidence and position on establishing a target for the delivery of
accessible homes within the private sector. 
2.47. The Scheme of Assistance (for private sector housing) is currently being
reviewed to include the changes to the Repairing Standard, which came into
force on 1 March 2024, and the promotion of positive outcomes for people living
with autism in the private housing sector. An action plan for consultation and
engagement will be prepared thereafter. 
New Actions 
2.48. To ensure the Local Housing Strategy 2023-28 continues to deliver on the
outcomes set out for North Ayrshire, three new actions have been developed
for adoption within the Strategy. These additional actions have their own
desired outcomes and target dates for achieving the desired outcomes. The
additional actions are as follows: 
140

Page 141

LHS_02. Develop Local Housing Plans to better understand the needs of our       
neighbourhoods in North Ayrshire.
Developing local housing plans is an important way to ensure that
neighbourhoods grow in a way that meets community needs while balancing
affordability and sustainability. The aim is to develop housing plans for each
locality which will identify and support the needs of current and future residents
of North Ayrshire and reflect a ‘whole system approach’ as part of the recently
announced Collaboration for Health Equity in Scotland and work to tackle child
poverty as part of the Fairer Futures Partnership. 
LHS_03. Collaborate with the Scottish Government to end the national housing              
emergency.
While there are acute housing pressures locally, a housing emergency has not
been declared in North Ayrshire. However, work is ongoing to support the
Scottish Government in ending the national housing emergency. Following
Scottish Government’s release of the Housing Emergency Action Plan on 2
September 2025, we are currently assessing the Council’s position against the
national actions, with the aim of relieving current pressures and preventing
North Ayrshire Council from requiring to declare a housing emergency in the
future. 
LHS_04. Ensure the Housing (Scotland) Bill 2024 legislation is embedded in all    
our policies and procedures.
The Scottish Government introduced the Housing (Scotland) Bill 2024 to
Parliament on 26 March 2024 to deliver its rented sector strategy, A New Deal
for Tenants, and some policy ideas for housing as set out in Housing to 2040,
while also seeking to deliver on an ambition to end homelessness. The Bill
makes changes in the law in relation to housing and the changes cover
protections for tenants, preventing homelessness, and other housing matters.
The Bill is at Stage 3 of the process, prior to becoming an Act of Parliament. At
Stage 3, MSPs can propose further amendments to the Bill, and these are
debated and decided on in the Debating Chamber. Officers will continue to
monitor and review the amendments agreed at stage 3, with all legislative
changes implemented in North Ayrshire as required. 
3. Proposals 
3.1. It is proposed that Cabinet: 
i. notes the content of this report and progress against the LHS Action Plan
to 31 March 2025;  
ii. approves the addition of the three new actions outlined at para 2.48 and
detailed in Appendix 1;
iii. approves the submission of the LHS update to the Scottish Government. 
4. Implications/Socio-economic Duty 
Financial 
141

Page 142

4.1. Any financial implications arising from the current projects and initiatives
included within the Local Housing Strategy 2023-2028 are reflected within
existing capital and revenue budgets. Business cases will be developed to
support emerging new initiatives, as required. 
Human Resources 
4.2. The Local Housing Strategy 2023-2028 is delivered by North Ayrshire Council
officers and relevant external partners, and is complemented by external
expertise, where required. 
Legal 
4.3. The development and monitoring of the Local Housing Strategy 2023-2028,
which sets out its priorities and plans for the delivery of housing and related
services in North Ayrshire, ensures compliance with the Housing (Scotland) Act
2001. 
Equality/Socio-economic 
4.4. The provision of good quality housing through the actions set out in the Local
Housing Strategy 2023-28 has a positive impact upon older people, children,
younger people, people with disabilities and households in fuel poverty. There
are no negative or discriminatory effects on any of the equality groups as a result
of the implementation of the strategy. 
Climate Change and Carbon 
4.5. The Local Housing Strategy continues to support the Sustainable North
Ayrshire Strategy 2024 - 2027, which aims to eradicate fuel poverty and
achieve net-zero carbon status by 2030. 
Key Priorities 
4.6. The Local Housing Strategy continues to support the Council Plan strategic
priorities: ‘Wellbeing;’ ‘Climate Change;’ ‘A Sustainable Council;’ and
‘Communities and Local Democracy.’ There is evidence that children and
young people can benefit from improved cognitive development and a reduction
in behavioural issues through living in a more attractive, warmer, and better
ventilated environment. The strategy also aims to support our island
communities and their economies. 
Community Wealth Building 
4.7. A number of the initiatives detailed within the Local Housing Strategy continue to
result in North Ayrshire Community Benefits through training and employment
opportunities delivered through the Council’s house building programme; the
wider Strategic Housing Investment Plan; Sheltered Housing reprovisioning
programme; and the Estate Based Regeneration programme. 
142

Page 143

Islands Communities Impact Assessment (ICIA)  
4.8. The Local Housing Strategy recognises that there are unique impacts faced by
our islands and includes measures to address them. Some policy interventions
will be specifically tailored to our islands, to ensure our islands communities
enjoy the same opportunities as those living on the mainland. 
United Nations Rights of the Child (UNCRC)  
4.9. The Local Housing Strategy affects children and young people indirectly. The
following groups of children and young people have been identified as those
potentially affected by the Local Housing Strategy: 
• From low-income households
• Living in deprived areas
• At risk of homelessness or homeless
• Victims of domestic abuse/part of a family affected by domestic abuse
• Looked after/accommodated children and young people
• Care experienced young people/young people leaving care
• Those with a protected characteristic 
Consumer Duty 
4.10.  ‘None’ 
Consultation 
5.1 The 2024/25 update on LHS 2023-2028 has been prepared by gathering
information from various project leads across Council Services, as well as partner
RSLs.
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Fiona Ellis, Senior Manager (Housing
Strategy & Development), on 01294 324031. 
Background Papers 
Local Housing Strategy 2023-2028
Customer Participation Strategy 2023-2028
Strategic Housing Investment Plan (SHIP) 2025-2030
Tackling Scotland’s Housing Emergency
Housing (Scotland) Bill as amended at Stage 2
143

Page 144

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
1
Collaboration 
LHS_01. Review and update our Tenant Participation Strategy to: 
• Ensure inclusive engagement with hard-to-reach groups 
• Ensure our literature is available in a format that is suitable for people with literacy and / or sensory / communication
issues 
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
A refreshed Tenant
Participation
Strategy is
adopted by the
Cabinet of North
Ayrshire Council 
Housing Services Customer Participation Strategy 2023-
2028 was approved by Cabinet on 13 June 2023 where
three key priorities were approved. For 2024 the following
took place:  
Priority 1 – Engage and Inform 
• Tenant Satisfaction survey carried out by Knowledge
Partnership on behalf of North Ayrshire Council’s
Housing Service (NAC). Action Plan devised, staff
and North Ayrshire Network informed of results.
• 1932 tenants are currently on the Tenant Panel. A
decrease of 35 since Q4 figure of 1967.
• Annual Return on Charter agreed and approved by
tenants at meeting held on 27/05/2025 with members
of the North Ayrshire Network, North Ayrshire
Inspection Panel and Service Improvement Groups. 
• We have 6145 followers on Facebook. This is a
decrease of eight followers in this quarter from 6153
in Q4.
• We have 686 followers on X. This is a decrease of
four since the last quarter
• Utilised Libraries App and Care Experienced App to
improve communication to customers and include
Housing Services information  
• 25 consultations events were held throughout 2024-
25
• Tenants Chat newsletter issued quarterly 
• Implement Tenant
Satisfaction survey
action plan 
• Engage with seldom
heard groups to
ensure all
communities have a
voice by developing
a new North Ayrshire
Network 
• Build capacity within
communities by
offering training
sessions.
• Review the
Customer
Participation Strategy
2023-2028 action
plan. 
• Develop Service
Improvement Groups
and sustain
membership 
• Devise and deliver
staff Virtual Events
covering Customer
Participation and
Consultation 
2023+  31 March
2026
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Housing,
Customer
Engagement &
Support) 
144

Page 145

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
2
• Annual Performance Matters newsletter issued
September 2024
• 1 Welfare Reform Messenger Session 19/06/2025
• Utilised Libraries App to include Housing Services
information
• Utilised Care Experienced App to include Housing
Services Information
• Social media messenger sessions hosted covering
rent arrears, Welfare Reform and housing support
• Estate management inspections carried out in all
areas where Tenant Groups are in operation annually
• Rent consultation carried out December 2024 with
1473 responses received. This was a 158 increase
on the previous year’s 1315 and the best response
we’ve had to a rent consultation. 
Priority 2 – Empower and Influence
TARA meetings have taken place with Redburn Grove,
Hayocks, Saltcoats High Flats, Castlepark and
Bourtreehill & Broomlands
• Developed Redburn Grove Gypsy/Travellers Tenants
Group to become a Registered Tenants Organisation
• Attendance at quarterly Sheltered Housing Complex
meetings
• A review of the Information Supplied Tenant
Inspection Panel findings and action plan delivery
• Six working group meetings took place with the NAN,
Editorial Panel, Major Works Working Group, Tenant
Event Group and Tenant Inspection Panel.
• Tenant-led scrutiny training provided by the Tenant
Participation Manager to the Tenant Inspection Panel
• Newly recruited Service Improvement Group
members have been trained in Tenant Participation
by the Tenant Participation Manager
• Capacity building within communities by offering a
suite of 15 training sessions, including Keeping Safe
Online; Scam Awareness; Financial Advice; Report 
145

Page 146

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
3
Writing; Tenant Participation Refresher; Microsoft
Teams Refresher; etc.
• Reviewed NAC staff iLearn Customer Participation
module
• Digital methods of contact developed to include SMS
text messaging  
Priority 3 Evolve and Innovate 
• Increased membership within Service Improvement
Groups and Tenant Inspection Panel with 20 new
recruits joining
• Developed partnership working with stakeholders and
other agencies.
• Coordination and delivery support of Saltcoats High
Flats Coffee Morning event
• Sharing good practice presentation delivery at
Scotland's Housing Network – Community &
Resident Engagement Community of Practice on
18/06/2025
• Attendance at People Strategy Network meetings in
Dalry and Beith (June 2025)
• Attendance at Cunninghame Housing Association
Tenants Conference with 4 NAN representatives
24/06/2025
• Attendance at Cost-of-Living events across North
Ayrshire communities
• Two-year Customer Involvement Strategy review  
LHS_02. Develop Local Housing Plans to better understand the needs of our neighbourhoods in North Ayrshire
Desired
Outcome   Latest update   Next Steps 
RAG
Status 
Original
due
date  
Revised
due date   Assigned to  
Development of
local housing plans
for each locality/
town to identify
and support the 
Local housing plans are an important way to ensure that
neighbourhoods grow in a way that meets community
needs, while balancing affordability and sustainability.
• Collaborate with
key partners to
develop LHPs,
aligned with
forthcoming  
31 March
2028 
Senior Manager
(Housing Strategy
& Development) 
146

Page 147

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
4
needs of current
and future
residents of North
Ayrshire
‘Locality
Profiles’, with
further details to
be submitted to
Cabinet in due
course
Team Manager
(Housing
Strategy) 
LHS_03. Collaborate with the Scottish Government to end the national housing emergency
Desired
Outcome   Latest update   Next Steps 
RAG
Status 
Original
due
date  
Revised
due date   Assigned to  
A housing
emergency is not
declared in North
Ayrshire  
The Scottish housing system is under significant
pressure, with the Scottish Government having declared a
national Housing Emergency on 15 May 2024 and 13
local authorities having declared their own housing
emergencies due to the unprecedented pressure to meet
their statutory responsibilities towards homeless people
and other priority groups in housing need. On 2
September 2025, the Scottish Government published the
Housing Emergency Action Plan with 3 main areas of
focus:
• Ending children living in unsuitable
accommodation;
• Supporting the housing needs of vulnerable
communities; and
• Building our future - maximising investment in
Scotland’s housing sector.
• Whilst there is increasing pressure on the North Ayrshire
housing system, a range of measures are being
undertaken across the housing system, including
increasing housing supply, and managing the demand
from homeless people by way of temporary and
permanent accommodation. 
• Assess North
Ayrshire against
the Scottish
Government’s
Housing
Emergency
Action Plan 
• Prepare and
implement the
actions set out
by the Scottish
Government.
• Continue our
good
partnership
working with
RSLs when
reviewing our
lets to homeless  
31 March
2028 
Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Housing
Strategy) 
LHS_04.  Ensure the Housing (Scotland) Bill 2024 legislation is embedded in all our policies and procedures 
147

Page 148

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
5
Desired
Outcome   Latest update   Next Steps 
RAG
Status 
Original
due
date  
Revised
due date   Assigned to  
The new Housing
Act legislation is
implemented in
North Ayrshire  
The Scottish Government introduced the Housing
(Scotland) Bill 2024 to Parliament on 26 March 2024 to
deliver its rented sector strategy, A New Deal for Tenants,
and some policy ideas for housing as set out in Housing
to 2040, while also seeking to deliver on an ambition to
end homelessness. The Bill makes changes in the law in
relation to housing and the changes cover protections for
tenants, preventing homelessness, and other housing
matters. The Bill is at Stage 3 of the process prior to
becoming an Act. At Stage 3, MSPs can propose further
amendments to the Bill, and these are debated and
decided on in the Debating Chamber. The six main parts
(chapters) to the Bill are: 
1. Rent paid by tenants under private residential
tenancies
2. Dealing with evictions
3. Keeping pets and making changes to let property
4. Other matters relating to tenants
5. Homeless Prevention
6. Other housing matters
• Monitor and
review the
amendments
agreed at Stage
3
• Develop an
action plan to
embed the
legislative
changes in
North Ayrshire
Council’s
policies and
practices  
31 March
2028 
Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Housing
Strategy) 
More homes at the heart of great places 
LHS_05. Use our role as a major house builder to maximise local employment and training opportunities, and encourage our
partners to do the same
148

Page 149

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
6
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Training and
employment
opportunities are
available for local
people 
The Council is committed to improving socio-economic
and environmental outcomes through community benefits
within its procurement activity and has a community
benefits policy in place. The policy aligns with Council
priorities, most notably those captured in the 2024-2027
Community Wealth Building Strategy and Local Outcome
Improvement Plans. 
Community benefits are mandatory for all Council
contracts above £500,000, therefore are included in all
social housing development contracts. 
For example, two modern apprentices and a graduate
apprentice have been employed at the Council’s Garnock
Academy housebuilding site as at May 2025. The
contractor has also delivered a number of employability
and career sessions for school children and via the
Council’s Employability team. 
Our Registered Social Landlord (RSL) partners are
encouraged to use Community Benefits Clauses in
construction and other tenders during scheduled update
meetings and at site nomination. 
• Continue to work
with the
Employability
Team and to
further exp-lore
joint initiatives
and employability
opportunities for
the wider
community. 
• Continue to
collaborate with
our contractors
to ensure local
contractors are
utilised where
possible. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Affordable
Housing &
Regeneration) 
LHS_06. Deliver 1,643 new units of social housing
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
1,643 new homes
are developed
The SHIP 2025-2030 approved at Cabinet 3 December
2024 increased the previous target from 1,641 to 1,643
new homes by 2030. This reflected the addition of the
third phase of the St Michael’s Wynd, Kilwinning
development, utilising the remaining unallocated
regeneration units. 956 new Council homes have been
delivered as at 31 March 2025 against the 1,643 target.
Despite the affordability challenges faced, 91 new homes
were completed by the Council and RSLs during 2024/25.
• Work continues
on site to
progress to
deliver 202 units
at Ayrshire
Central Hospital,
Irvine. 
• Laburnum
Avenue, James 
2028 31 March
2030
Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Affordable
Housing &
Regeneration)
149

Page 150

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
7
The Council’s Resource Planning Assumption (RPA) for
2025/26 has been confirmed as £15.878m. The uplifted
budget (when compared to the estimate within the
Strategic Housing Investment Plan 2025-2030) will
support delivery of prioritised projects and the shadow
programme. Officers continue to explore
alternative/additional mechanisms to support affordable
housing delivery. 
McFarlane,
Stanecastle,
King’s Arms &
Garnock to
complete during
2025/26.
• Explore
alternative/additi
onal
mechanisms to
support
affordable
housing delivery.
• Deliver
remaining
programme to
achieve 1,643
units by 2030. 
LHS_07. Deliver 1,300 new units of private sector housing
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
1,300 new private
homes are
developed
Private developers delivered 280 new homes during
2024/25, bringing the total number of units delivered by
the private sector to 528 since April 2023. 
Development is underway at all five new sites allocated by
LDP2, which together will deliver over 1,000 private sector
homes in addition to other active sites, including
Montgomerie Park and West Byrehill. Successful
completion of these and other smaller sites by 31 March
2028 would result in the 1,300-unit target to that date
being exceeded.  
A Draft Delivery Programme was submitted to Scottish
Government on 8 April 2025, setting out actions required
to deliver sites within the housing land supply.
• Continue to work
with private
developers to
deliver 1,300
new private
homes target by
2028.
• Finalise 2024/25
Housing Land
Audit and
Delivery
Programme (to
be published
following
approval
alongside the 
31 March
2028 
Senior Manager
(Planning) 
Strategic Planning
Manager  
150

Page 151

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
8
LDP Evidence
Report) 
LHS_08. Consider opportunities to provide homes in and around our town centres
Desired
Outcome  Latest update  Next Steps
RAG
Status
Original
due
date 
Revised
due date  Assigned to 
Housing is
developed in or
around town
centres, where
feasible
Work is nearing completion for the Council’s development
of 6 amenity flats in Irvine town centre at the former King’s
Arms public house. The Council also plans to refurbish a
block of flats on Nelson Street, Largs - near the town
centre - to provide three new homes.
• Deliver further town
centre homes, where
feasible, during the
lifespan of the SHIP.
• Continue to work in
partnership with the
Regeneration Team
to identify potential
development
opportunities. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development) 
Affordability & Choice 
LHS_09. Enforce a zero tolerance approach to harrassment and abuse against equalities groups
Desired 
Outcome   Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Every identified
incidence of
harassment is
investigated and
actioned
All risk assessments/ procedures for lone working have
been updated to reflect added caution due to staff
experiencing an overall increase in health and safety
incidents associated with violence and aggression.
From April 2025, Health and Safety Officers will deliver
bespoke Personal Safety Training to all Housing Staff.
From June 2025, Risk Assessment Training will be
made available to staff. 
In relation to our tenants and communities, our Housing
Officers address any issues of harassment or abuse
involving our tenants through our Estate Management
procedures. 
• Staff encouraged
to log all incidents
on Assure
System, with
debriefing process
established.
• All incidents
outlined within
quarterly Health
and Safety Action
Plan to gain wider
perspective and
actions taken. 
2024 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Neighbourhood
Housing) 
151

Page 152

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
9
The Anti-Social Behaviour Investigation Team work
directly with Police Scotland to address community
issues and cases of tenants that have escalated. 
We work in partnership with Police Scotland and have a
dedicated Police Liaison Officer who provides daily
updates of any reported crimes within our tenancies.
This Officer also assists with other teams such as the
Housing Advice Team for households who advise they
are fleeing external harassment. 
PREVENT Training for Managers has been undertaken
to facilitate full participation in Prevent Multi Agency
Panel meetings. 
• All operational
staff within
Housing Services
will undertake
PREVENT
Awareness
training. 
LHS_10. Train our staff to understand cultural differences and challenges faced by different ethnic groups
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100% of our staff are
trained
All staff have completed their mandatory North Ayrshire
Council Equality and Diversity 2025 training module on
iLearn. Completion records are recorded centrally on
the HR system CHRIS to ensure 100% completion.
• New staff
members will be
asked to complete
the mandatory
module. All staff
will complete the
2026 module
once this
becomes
available. 
• Internal Learning
Event organised
on Gypsy
Travellers on
10/07/2025 
2024 31 March
2028
Senior Manager
(Housing Strategy
& Development) 
Team Mananger
(Housing
Innovation and
Digital
Development)  
LHS_11. Work with national agencies and local partners to ensure refugees, asylum seekers and other displaced people
affected by conflict are supported to live in safety in our area
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
152

Page 153

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
10 
100% of refugees
and people
displaced by conflict
who are housed in
our area received
support
Our Refugee Support Team continue to work together
with the CPP partners to provide high quality support to
assist families to integrate into local communities and
access vital services to meet their individual needs.
Following the successful completion of previous
resettlement pledges (2015 – 2025), North Ayrshire
Council’s voluntary involvement in UK Government
Resettlement programmes (UKRS/ARAP/ACRS) has
recently been reviewed and paused for the time being.
However, previously settled refugees and people
displaced by conflict living within North Ayrshire
continue to have access to support services when
required. 
• The Housing
Services Refugee
Resettlement
Transition
Strategy 2025-26
has been agreed
and is currently
being
implemented. The
Strategy includes
an action plan
which has been
developed to
achieve the key
actions which will
be monitored
through the
Refugee
Resettlement Task
Force. 
• The aims and
objectives of the
strategy consider
the progress
made in achieving
and supporting
ongoing
humanitarian
resettlement
across North
Ayrshire’s
communities. In
addition, they take
account the
impact of reducing
demand for
Housing Services 
2023+ 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Housing,
Customer
Engagement &
Support)   
153

Page 154

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
11 
and responsibly
phase out housing
support services
by 31 March
2026, ensuring
continuity for
essential needs
while identifying
non-priority
services for
cessation in a
sustainable and
equitable manner.  
LHS_12. Engage with Gypsy / Travellers to ensure that housing solutions meet their needs
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Gypsy / Travellers
needs and
aspirations are
reflected in all
service provision
We continue to work with partner services delivering
support to the community with MECOPP, Education,
Money Matters, NHS, and the Tenant Participation (TP)
Team. 
The TP Team continues to meet with Redburn
Residents’ Group each month. In January 2025 the
Group held their AGM, with residents showing their
support to the group and maintaining positive
engagement with NAC to ensure they continue to
influence decision-making around site issues. The
group gave their feedback to NAC budget engagement,
Tenant Satisfaction Survey, and 2025-26 rent
consultation.  
NAC/MECOPP/NHS worked in partnership to deliver
services at Redburn, including voicing their concerns to
the COVID 19 inquiry. 
Eglinton Medical Practice offers monthly clinics at
Redburn Grove specifically for the Gypsy/Traveller
• Action plan to be
drafted and
agreed, factoring
into consideration
feedback from the
recent Gypsy /
Traveller
Satisfaction
Survey.
• Ongoing
engagement with
the Redburn
Grove tenants
through monthly
meetings of the
Redburn Grove
Tenants
Association and
additionally via the
Redburn Record
newsletter. 
2023 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Housing,
Customer
Engagement &
Support)   
154

Page 155

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
12 
community. Members of the community gain direct
access to a General Practitioner in the Redburn Grove
Community room. 
Outreach tutors provide education onsite to
Gypsy/Traveller young people every Tuesday in the
Redburn grove community room. Currently there are
two regular students working towards various levels of
education in Maths, English, history, and sciences.
Residents voiced their opinions in January to the
Housing Services satisfaction survey. The results are
being reviewed and acted upon by senior management
team. 
Young people on site were given Christmas gifts and
selection boxes in partnership with Christians Against
Poverty and Random Acts of Kindness. 
In December 2024, power cards became available for
purchase at the new Public Protection office at Maress
House, Irvine. This gives residents the option to
purchase power cards out with office hours.
• Housing Services
to continue to
work in
partnership with
supporting
agencies to
ensure Gypsy /
Traveller needs
and aspirations
are factored into
consideration.  
LHS_13. Listen to Gypsy/Travellers from unauthorised encampments so that we can better understand and respond to
their needs
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
155

Page 156

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
13 
100% of
Gypsy/Travellers
living in unauthorised
encampments are
approached for a
Support and Needs
Assessment
During 2024/25 officers engaged with and managed 67
unauthorised encampments: 17 of these being between
1 January – 31 March (Q4). Our Gypsy/Traveller Co-
ordinator completed a needs assessment for every
unauthorised encampment site and provided advice
and support to the Gypsy/Traveller community where
required.
Our Gypsy/Traveller Co-ordinator updated relevant
services with any issues raised and liaised with
members of the public to strike a balance between the
travelling and the settled community. We also worked in
partnership with Police Scotland to perform 5 joint visits
to unauthorised encampments. Between 1 April 2024
and 31 March 2025, we responded to 258 concerns
regarding encampments.
• Continue to work
in partnership to
support and
manage
unauthorised
encampments
across North
Ayrshire.
• Consider the
Scottish
Government’s
research on the
‘negotiated
stopping’ model
for supporting
roadside
encampments
pilot report
recommendations. 
2023 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Housing,
Customer
Engagement &
Support) 
LHS_14. Carry out an options appraisal on potential Gypsy / Traveller site improvements
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The publication of
our findings, and
supporting action
plan (if feasible)
On 3 June 2025 Cabinet approved the inclusion of the
Redburn Grove redevelopment in the Strategic Housing
Investment Plan 2026-2031, which will be considered
by Cabinet in October 2025. 
• Site to be
included within the
SHIP 2026-2031.
• Scottish
Government
Guidance in
relation to funding
for
Gypsy/Traveller
site improvements
awaited 
2024  Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Affordable
Housing &
Regeneration)    
LHS_15. Develop and deliver an LGBTQ+ informed housing service, including:
• Establish LGBTQ+ champions 
• Develop an LGBTQ+ staff training programme
156

Page 157

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
14 
• Increase private sector awareness of LGBTQ+ housing issues
• Encourage our LGBTQ+ tenants and residents to participate
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The delivery of an
inclusive housing
service is evidenced
by involvement and
participation in the
delivery and
development of
housing services
An LGBTQ+ awareness session was delivered to staff
in July 2024. This was delivered by the Terrance
Higgins Trust and a copy of the presentation slides are
available for all staff to view. 
All staff have completed the mandatory training module,
Equalities and Diversity 2025. The completion record for
this is saved on the HR System. 
Ongoing engagement with seldom heard groups is
taking place via the Communities Team. 
• The Tenant
Participation
Team will engage
with seldom heard
groups to ensure
all communities
have a voice by
developing a new
North Ayrshire
Network. LGBT+
representation will
form part of this
new wider
inclusive Network. 
2024 31 August
2025
Senior Manager
(Housing Strategy
& Development)
Team Mananger
(Housing
Innovation and
Digital
Development)  
LHS_16. Work in partnership with statutory and third sector agencies to deliver planned national changes to
homelessness prevention legislation
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Publication of our
response
The Housing Bill is currently at Stage 3. 
The North Ayrshire Homelessness Taskforce are
currently working to understand the homelessness risk
factors affecting each of the partner organisations with
a role in homelessness prevention in North Ayrshire.
The findings from this work are being used to develop
the North Ayrshire Homelessness Strategy, aligned to
the proposed new homelessness prevention duties
detailed within the Housing (Scotland) Bill 2024. 
The Task Force identified the priority groups where
further consultation with partners would be required in
relation to the impact of ‘ask’ and ‘act’ and how to
improve partnership working. The agreed groups are as
follows: 
• Domestic abuse
• Continue to work
with the Homeless
Task Force in
partnership to
maximise the
opportunities for
homeless
prevention. Next
Task Force
meeting
03/07/2025.
• The outcome from
these groups is
currently being
utilised to help
inform the 
2023+ 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Homeless
Prevention and
Advice) 
157

Page 158

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
15 
• Communities & education
• Health & complex needs
• Children impacted by homelessness
• Justice & community safety
The groups have all met and the feedback is being
used to inform on the Homeless Prevention Strategy
and associated action plan. 
A Housing Services Partnership awareness event is
being arranged for 30/10/2025. The aim of the event is
to highlight the various areas of Housing, the Housing
Bill (‘Ask’ and ‘Act’) and to promote partnership working.
This will take the format of a ‘conversation café’ and
‘marketplace’ encouraging networking across the
services. A talking wall will be on display and
participants will be asked to provide feedback and
suggestions on how to work better together. 
Co-ordinators and frontline staff are carrying out
scheduled visits to partners frontline services to raise
awareness of the assistance available through the
homeless service, promote joint working, develop
relationships, resources available, and the ‘Ask and Act’
duty. 
strategy and
action plan. 
• These groups can
be reconvened to
carry out targeted
pieces of work.
• Learning from this
event will be used
to inform the
Homeless
Prevention
Strategy. 
• Continue to
schedule sessions
and capture a
wide range of
partners. 
LHS_17. Develop and deliver a North Ayrshire inter-agency strategy to prevent homelessness
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Levels of
homelessness will
reduce
The Homeless Prevention Strategy is currently being
developed with partners input via the Homeless Task
Force. This will be tied into a review the Rapid Re-
housing Plans (RRTP). 
In order to finalise this, we are currently procuring the
service of a Housing Consultant to incorporate a Rapid
Rehousing review and future plans. 
• The strategy
remains in
development
along with the
review of the
RRTP. 
2024 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
LHS_18. Through the ‘Violence Against Women Partnership 2021-2026, deliver the North Ayrshire violence against
women and girls action plan aligned to the ‘Equally Safe' strategy
158

Page 159

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
16 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
A reduction in
domestic violence
and achievement of
the Violence Against
Women National
Standards
accreditation
North Ayrshire VAW Partnership meetings were re-
established in May 2025 and the VAW National
Improvement Service have agreed to visit North
Ayrshire later this year to undertake member
consultations to inform the local VAW Strategy in
accordance with Delivering Equally Safe priorities.   
A VAW Lead Officer post is currently being recruited.
The 16 Days of Action Operational Group was re-
established in August 2025, with the first meeting
arranged for mid-September. 
Of the 1184 homeless cases in 2024/25, 171 (14.4%)
individuals reported to be fleeing domestic violence in
comparison with 133 in 2023/24. Of the 171, 142 (83%)
were females. 
Temporary Housing and Support Service to Women
experiencing or at risk of violence contract is currently
subject to tender, with the new contract to be effective
from 1 October 2025. 
• Recruitment of
VAW Lead Officer
• Development of
North Ayrshire
VAW Strategy and
Action Plan
aligned to
Delivering Equally
Safe National
Strategy. 
• Conclusion of
tender process for
Women at Risk of
Violence.
• Implementation of
contract and
monitoring
framework. 
2026  Senior Manager
(Neighbourhood
Housing &
Homelessness)
(Temporary
Accommodation,
Resourcing and
Housing Support) 
LHS_19. Work with our partners to develop a hospital discharge pathway
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
0% of those leaving
a health care setting
will be homeless
We are collaborating with partners, to create a hospital
discharge pathway that will recognise the proposed
“Ask” and “Act” recommendations within the Housing
Bill. This will promote partnership working and
encourage early intervention to prevent homelessness
and ensure the housing needs of patients are identified
on admittance.    
• Creation of
hospital discharge
pathway 
2023 31 July 2026 Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
LHS_20. Continue to work with the HSCP to support young people make the transition from care to a home of their own
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
159

Page 160

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
17 
100% of young
people are
supported as they
leave care and move
into their own home
Through the Brighter Pathways group, we have
refreshed the ‘Housing and Care Leaver Protocol’,
which is currently in draft format. 
From April 2024 to end March 2025, 14 tenancies were
allocated to individuals who are in receipt of continued
care through the Local Authority. 
Housing Support for individuals who are in receipt of
continued care is provided solely by the HSCP
Throughcare Team, as outlined within the Housing and
Care Leaver Protocol.
• Enhanced
Housing Options
interviews are
being offered by
Senior Housing
Officers across
localities   to all
Care Leavers to
ensure that their
housing needs
are met and
maximise tenancy
sustainability. 
• Weekly updates
are being
provided to HSCP
regarding
individual
applicant status. 
2024 31 March
2027
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
LHS_21. Consider the pathways into housing for young people to maximise housing options specific to their needs and
reduce the risk of homelessness
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Fewer young people
become homeless
We have recruited 2 Housing Advice Officer
(Prevention) posts. 
Initially these posts will concentrate on reducing youth
homeless for individuals leaving the familial home and
those who hold their own tenancies. These officers will
liaise with Partners to create a referral pathway and to
promote homeless prevention. 
Further consideration to be given to piloting housing
First placements for vulnerable youths. 
• Continue to
monitor homeless
statistics and the
impact of the
Prevention Officer
role. 
• Recruit second
officer
• Draft referral
protocol
• Work with
Housing Advice
Officers
(Prevention) to
identify vulnerable
youths for 
2024 31 March
2027
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Homeless
Prevention and
Advice) 
160

Page 161

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
18 
Housing First and
develop criteria  
LHS_22. Implement the integrated prison discharge protocol
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Homelessness as a
result of prison
discharge is reduced
to below 5%
Document is complete but remains in draft format. The
protocol is reflective of the current practices of the
Housing Advice Officer (Prisons). 
During 2024/25 63 individuals approached for homeless
assistance, this accounts for 5.3% of all approaches.
During 2023/24, 77 individuals were homeless following
prison discharge which accounted for 7% of all
approaches. 
• Continue to
monitor statistical
data.
• Draft integrated
prison discharge
protocol to be
reviewed to
ensure it meets
the SHORE
standards. 
2023 31 March
2026
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
LHS_23. Implement Housing First for our most disadvantaged service users
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
100 Housing First
Tenancies are
delivered by 2024
By 31 March 2025 we successfully created 123
Housing First tenancies. At 31 March 2024, we had
exceeded the target by creating 103 tenancies. We
have planned within current budget constraints to
continue to create 20 tenancies per annum over the
next 4 years.   
• Continue to create
20 tenancies
annually 
2023  Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager 
(Temporary
Accommodation,
Resourcing and
Housing Support) 
LHS_24. Undertake a review of tenancies which have failed in the previous 12 months following resettlement of
homelessness to inform allocation processes
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
161

Page 162

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
19 
Increased tenancy
sustainment  Tenancy sustainment for Homeless applicants has
fluctuated considerably over the past few years. In the
reporting year 2022/2023 we achieved 86.5%
sustainment success for tenancies which began 12
months previously, however by the following year
2023/2024 this figure reduced significantly to 84/02%.
By 2024/25 this figure recovered to 86.59%, thus
improving our national sustainment status. 
Further analysis of this marked reduction in 2023/2024
highlighted that 78 of 489 tenancies failed, with 22 of
the 78 being abandoned. Of these 22 tenants, high
levels of need in relation to addiction, poor mental
health, Justice Involvement and instances of domestic
violence were highlighted. A similar exercise undertaken
in June 2025 noted that 65 of 522 tenancies failed, with
23 of these being abandoned. 
Housing Services are working in partnership with
NADARS, Justice Services and Mental Health Services
through the auspices of ADP(Alcohol and Drug
Partnership) to establish sustainment forum.
• Current review of
Housing Support
role to ensure
focus of person
support.
• Current review of
temporary
Accommodation
officer role to
ensure focus of
property support. 
• Workforce
planning to
ensure
appropriate skills/
training and
learning.
• Encourage
partnership
working 
• Development of
screening process
and Information
Sharing
agreement for
multi-agency
sustainment
Forum Review
and establishment
of robust internal
oversight systems
and monitoring. 
2024 31 March
2026
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager  
(Temporary
Accommodation,
Resourcing and
Housing Support)  
LHS_25. Review the Rent Deposit Guarantee Scheme and recommend future approach
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
162

Page 163

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
20 
Publication of the
review and action
plan (as appropriate)
The Rent Deposit Scheme is currently paused as we
have been unable to encourage landlords to use the
service. The Private Sector Housing Team have been
working with the Housing Advice Team to support
homelessness prevention measures. The team are
currently piloting an approach where a homeless
presentation is due to the tenant being served a Notice
to Leave by their landlord. The Private Sector Advice
team contact the landlord to either mediate or
encourage the landlord to use our landlord-to-landlord
sales service with the intention that the tenant can
remain in the property. The pilot outcomes will be
reviewed with the expectation that the service can be
further evolved to ensure we are supporting private
tenants within our communities.  
• Review outcomes
from the new
approach to
develop the
service.
• Review the Rent
Deposit Scheme
on a yearly basis
due to the
changing
landscape of the
private rented
sector.
• Promote
Landlord-to-
Landlord Sales
service 
2024 31 March
2025
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing
Strategy)  
LHS_26. Align support delivery to prevention activities as identified within the Homelessness Prevention Strategy
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Appropriate levels of
support available to
prevent and alleviate
homelessness
The Housing Advice Team continue to provide advice
and information to households who are homeless or
threatened with such, to maximise the opportunity for
homelessness prevention. Tailored Homelessness
Prevention training to be developed to upskill Housing
staff. 
Two Housing Advice Officer posts have been created,
focussing on targeted prevention for 16- to 24-year-old
households being asked to leave the familial home.
One Officer came into post in February 2025, and
second post came into position in July 2025. 
Housing Support continues to be provided to all in
temporary accommodation during their resettlement
period of 12 months. 
• Implement
Homelessness
Prevention
Strategy
• Training providers
to be approached
and tailored
course to be
produced. 
• Monitor and
review process.
Review outcomes
to measure
success and any
other areas for
targeted
prevention. 
2024 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
163

Page 164

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
21 
• Currently
reviewing the role
of housing
support staff to
ensure holistic,
person-centred
partnership
approach is
adopted.
• Increased
opportunities for
learning in
conjunction with
other services.  
LHS_27. Review the proportion of social rented lets to homeless people to minimise the duration of homelessness
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Reduce the length of
stay in temporary
accommodation by
50% from 26 weeks
to 13 weeks 
In 2023/24 the average weeks in temporary
accommodation was 16.4 weeks (115 days) for cases
closed. In 2024/25 this has decreased to 15.8 weeks
(111 days). 
Shared temporary accommodation model explored and
further work to be carried out on the corresponding
financial model. 
• Continue to
streamline service
delivery to ensure
efficiencies and
timescales are
being met. 
• Continue to
benchmark and
learn from other
local authorities
with regards to
alternative models
of temporary
accommodation
and best practice.
• Further consider
the model of
shared
accommodation in
North Ayrshire. 
2024 31 March
2028
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Homeless
Prevention and
Advice)  
164

Page 165

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
22 
LHS_28. Consider introducing alternative housing models to meet local housing needs beyond social rented
accommodation
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The publication of
the review and any
associated action
plan
Research into the feasibility of mid-market rents for
North Ayrshire has commenced and a report will be
drafted in 2025 with recommendations.  
NAC continue to work with the Scottish Government on
the feasibility of innovative models that are being
developed, including leasing schemes. The Housing
Investment Taskforce was established in April 2024 by
Scottish Government to identify actions that will unlock
both existing and new commitments to investment in
housing across all tenures. The report was published in
June 2025 and identified 28 actions to support
investment in new and existing business models to
deliver at scale across Scotland. 
Funding has been secured for support for social renters
and other priority groups to buy a home on the open
market with support from the Scottish Government’s
LIFT Open Market Shared Equity (OMSE) Scheme.
This helps low to moderate income households buy a
home, often freeing up much-needed social housing or
reducing waiting lists. The fund is administered by Link
Group.
• Research will
continue during
2025, and a paper
will be drafted on
the feasibility of
mid-market rents
for North Ayrshire.
• Review the
Housing
Investment
Taskforce report
and identify
opportunities for
North Ayrshire.
• Raise awareness
of the LIFT Open
Market Shared
Equity Scheme 
31
December
2025 
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing
Strategy)  
LHS_29. Support the Scottish Government's target to deliver 110,000 new affordable homes by 2032 by delivering the
projects set out within the Strategic Housing Investment Plan
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
New affordable
homes are built in
North Ayrshire
From April 2024 to 31 March 2025, 71 new build
Council homes were delivered, and 20 new build homes
were delivered by our Registered Social Landlord
partners (RSLs). 
• Continue to
monitor Council
and Registered
Social Landlord
(RSL) completions
projected for
2025/26. 
2028 2032 Senior Manager
(Housing Strategy
& Development)
Team Manager
(Affordable
Housing &
Regeneration)
165

Page 166

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
23 
• Continue to
monitor Resource
Planning
Assumption (RPA)
availability and
deliverability of
current SHIP
projects.  
LHS_30. Research barriers to mutual exchange in order to increase its use as a rehousing solution
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
There is an increase
in the number of
mutual exchanges
A review of the Housing Allocation Policy is currently
being conducted to optimise the use of housing stock to
meet the needs of council tenants and housing
applicants. Once this has been completed a relaunch
and promotion of Mutual Exchange option will be
implemented.
• Relaunch &
promotion of
mutual exchange. 
• Feasibility of
creating a Mutual
Exchange Officer
post to be
explored. 
2024 31 December
2026
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Housing,
Customer
Engagement &
Support)   
LHS_31. Work with partners to align the North Ayrshire Allocation Policy to emerging issues, incorporating national and
local priorities
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The new policy is
published
Following consultation with applicants, tenants, tenants’
groups, and key stakeholders (11 Dec 2023 - 21 Jan
2024), the North Ayrshire Housing Register (NAHR)
partners have successfully undertaken and concluded
remodelling requirements to assess the potential scale
of impact for the proposed changes to the allocation of
housing. The draft North Ayrshire Housing Allocation
Policy (NAHAP) has been reviewed by NAHR partners
and is scheduled to be considered by Cabinet in
September 2025. 
• Due to be
considered by
Cabinet on 30
September 2025,
with full
implementation to
follow by 30
November 2025. 
2023 &
2026
30 November
2025 
Senior Manager
(Neighbourhood
Housing &
Homelessness) 
Team Manager
(Housing,
Customer
Engagement &
Support)   
LHS_32. Increase the social housing supply by buying back former social housing
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
166

Page 167

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
24 
Former social
housing is brought
back into the
affordable housing
supply
During 2024/25 the Council acquired two properties via
the SHIP and Trust Housing Association acquired two
homes on Arran through the Rural Affordable Homes
for Key Workers Fund which is available to 2028. 
Due to the current pace of the housing market the
Council has been finding it difficult to acquire homes
that are marketed for sale. Officers will look to target
acquisitions to minimise the number of missed
opportunities. 
NAC and RSLs continue to work in partnership to
identify suitable properties that can be bought back
using the Rural Affordable Homes for Key Workers
Fund to increase the affordable housing stock available
on our islands. 
• Continue to buy
back properties,
subject to funding
availability.
• Housing
Acquisition
Strategy is under
preparation and is
expected to
launch in late
2025.
• Identify further
properties that
can be bought
back using the
Rural Key
Workers Housing
Fund and
progress where
feasible. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Affordable
Housing &
Regeneration)  
LHS_33. Bring empty homes back into use through the buy back scheme
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Empty homes are
purchased and
brought back into
use as affordable
housing
A new process for acquisitions was developed in
2024/25 through consultation with teams in Housing
Services and PMI. The process will launch in 2025 and
has a strategic approach to acquiring properties in our
communities including an increased focus on long-term
empty homes. One empty home was acquired in
2024/25.
• Monitor the
progress of empty
homes
acquisitions
following the
introduction of the
new process.
• Proceed with
empty homes
acquisitions where
the strategic
needs of the
service can be
met by the
property 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing
Strategy)  
LHS_34. Assess the future housing need and demand of our island residents, workers, and key workers
167

Page 168

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
25 
Desired
Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Island residents’
needs and
aspirations are
reflected in all
service provision
North Ayrshire Council has established the Arran
Housing Task Force (AHTF) to quantify demand for
affordable housing on Arran and identify issues that
may be limiting economic growth. A quantitative study
was undertaken to determine affordable housing
demand on the island, recognising the assessed
housing demand information from the North Ayrshire
Housing Register and community feedback. Following
the study, the AHTF recognised areas that required
further analysis, and the Arran Housing Survey was
developed and launched on 31 January 2025. The
survey looked for responses from Arran households,
employees/employers on the island, landlords, second
homeowners, empty homeowners, short-term let
owners, and those wishing to move to the island, to
help shape future housing provision on the island.
Following the survey closure on 14 April 2025, the
results are being analysed by the Council’s Housing
Strategy Team and will be presented to the AHTF. The
survey report will require formal sign off by the AHTF
and will be published thereafter with the AHTF action
plan amended to reflect the outcomes. The AHTF
membership includes the Scottish Government,
Highlands and Islands Enterprise, local community
groups, and Arran registered social landlords.  
A new temporary post within the Council’s Housing
Strategy Team is being funded from the income from
the reduction in discount for empty and second homes
Council Tax in North Ayrshire to support the work of the
AHTF and the delivery of the Rural and Islands Housing
Action Plan. 
North Ayrshire Council launched the Arran Local
Lettings Initiative in 2021, which awarded Arran
residents and/or workers additional points on their
housing application. As part of the North Ayrshire
Housing Allocation Policy review, it is proposed that the
• Develop and
implement the
action plan for the
AHTF following
the outcomes
from the Arran
Housing Survey.
• Continue to
review the
demand on the
North Ayrshire
Housing Register
for Arran &
Cumbrae to
inform future
priorities. 
31 March
2028 
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing
Strategy)
168

Page 169

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
26 
Arran LLI is adopted into the policy and would therefore
be used by all partner landlords who have properties on
the island. The draft North Ayrshire Housing Allocation
Policy is scheduled to go to Cabinet in September
2025. 
Affordable Warmth & Zero Emissions 
LHS_35. Support the Environmental Sustainability and Climate Change Strategy to reduce fuel poverty and increase affordable
warmth
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Fuel poverty is
reduced, and
affordable warmth is
increased for North
Ayrshire residents
During the design and planning for each individual
project progressed through out SHIP, an options
appraisal is carried out to determine the most
appropriate sustainability measures required to reduce
fuel poverty for our tenants.  In our most recent
developments, we have opted for air source heat
pumps alongside enhanced fabric measures and solar
PV panels.  An assessment was carried out for each
site and measure to ensure property running costs
were affordable for our tenants alongside contributing
to our net zero target.   
The Area Based Scheme (ABS) continues to deliver
energy efficiency and low carbon technology to private
sector households, in hard-to-treat areas. During
2024/25 this targeted scheme has been focused on
improving affordable warmth in island properties i.e.
Arran and Great Cumbrae, whilst providing roof
mounted solar PV to properties in the Kilwinning area
where ABS has previously been used to install external
wall insulation. 
• Continue to
review each
project on a site-
by-site basis to
ensure the most
appropriate
sustainability
measures are
utilised.
• The Council will
continue to utilise
Scottish
Government
funding through
ABS and is
investigating the
potential to
expand the ECO4
Flex partnership
scheme to
include other
local businesses. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development) 
Senior Manager
(Property
Management and
Investment)
169

Page 170

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
27 
In addition, we have been working in partnership with
Green Home Systems, an Irvine based company, to
access ECO4 Flex funding, and through this
partnership have installed 134 measures, such as
ASHP, solar PV, loft, room in roof, internal wall and
cavity wall insulation, boiler upgrade, first time central
heating and TRVs, in 32 properties, releasing over
£900k of additional funding into North Ayrshire. 
The Council also offers Energy Smart emergency
support payments for those vulnerable to fuel debt, to
support a reduction in fuel poverty, with £122,350 of
grants released in 2024/25. The Energy Smart physical
measures programme has also been launched, offering
low-cost energy efficiency measures to private sector
households.
The Council also installs solar PV and EWI as part of
the roof and render scheme for the Council's domestic
stock, supporting a reduction in resident's energy bills
whilst reducing heat loss and improving health and
wellbeing. 
The Energy
Smart schemes
continue to
progress in
2025/26 also.
• Increased
engagement
within
communities via
the Community
Climate Action
Plan programme
of talks is hoped
to increase
uptake of offers
available
residents across
North Ayrshire. 
LHS_36. Implement a range of energy efficiency and decarbonisation measures across Council housing stock to meet EESSH2
requirements informed by an EESH2 pathfinder focusing on a whole-house approach to retrofit
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
A whole house
approach to energy
efficiency and
decarbonisation is
adopted for Council
housing stock
North Ayrshire council have appointed external
architects (MAST) to carry out a pathfinder project, the
purpose of which is to fully understand the financial,
technical and customer implications of complying with
Zero Emission targets. 
The information gained will be used to inform NAC’s
future strategy and business planning assumptions and
provide technical solutions for NAC to facilitate the
retrofitting of zero emissions measures. 
The study focuses on the traditional housing stock built
between1945 and 1960, which makes up
approximately 75% of the stock. 
• Further meeting
with MAST
architect has
taken place to
discuss
environmental
monitoring
requirements and
possible supplier
to allow project to
progress.
Properties will
now be identified
for monitoring
installation and 
2023+ 31
December
2026
Senior Manager
(Property
Management and
Investment)
170

Page 171

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
28 
The initial properties have been surveyed, and MAST
have issued their recommendations and will agree a
proposed scheme of works for each property. We are
currently seeking a suitable contractor to provide
monitoring within the properties. A budget of £0.550m
has been agreed for this project. 
inclusion in the
next phase.
• Once monitoring
is complete,
installation
programme of
measures
suitable for each
property will be
carried out and a
further monitoring
period will be
undertaken to
ascertain the
impact of
measures and
inform future
strategy in this
area. 
LHS_37. Review our approach to dealing with dampness and mould issues within properties
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
All our properties are
free from dampness
and mould and
advice given to
private sector to
achieve same
outcome
A comprehensive process map has been developed to
ensure issues with damp and mould are effectively
addressed.
The core principles of this process have been
implemented and further elements, such as an
expansion in the use of electronic monitoring, are being
explored.
Tenant engagement has also been increased, with
regular information provided via corporate social media
channels.
Subject to Parliamentary approval, the Scottish
Government have announced within the Housing
Emergency Action Plan that they will implement
Awaab’s Law from March 2026 starting with damp and
mould to ensure landlords promptly address issues
hazardous to tenants in the social and private rented
sectors.
• Continued
development of
surveying and
reporting
methodology
• Joint working with
health
professionals
when required to
progress
escalated cases
(e.g. NHS Nurse
Led Asthma
Clinic) 
2023 31 March
2026
Senior Manager
(Property
Management and
Investment) 
Senior Manager
(Operations –
Building Services)
171

Page 172

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
29 
Improving the quality of our homes 
LHS_38. Review Census 2022 data to identify any emerging issues which may impact housing and related services
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Develop an action
plan to address any
issues which may
emerge following
review
Economic Policy are currently reviewing the Census
data and are creating an action plan on depopulation
which will include a focus on housing. The Housing
Strategy Team will continue to work closely with
Economic Policy to develop the action plan
• Continue the
joint working
across services
to develop the
depopulation
action plan. 
2024 31
December
2025
Senior Manager
(Housing Strategy
& Development) 
Team Manager
(Housing Strategy) 
LHS_39. Promote and provide a ‘pre-tenancy support service’ for landlords (on tenancy agreements and property standards)
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Landlords are
supported to create
and maintain
tenancies in
accordance with
legislative
requirements
The pre-tenancy support service was established in
April 2019 and is managed by the Private Sector Team.
Uptake has been low, and the team continues to look at
alternative ways to promote the service. 
The team continue to support landlords, owners, and
tenants in North Ayrshire with a range of other services
including tolerable standard inspections, missing shares
assistance, common repairs, resolving disputes, and
empty homes.
• The team will
continue to look
at alternative
ways to promote
the service.
• Review the stage
2 and 3 lead
committee report
on the Housing
(Scotland) Bill
2024 to ensure
the private sector
service remains
fit for purpose. 
2023  Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing Strategy) 
LHS_40. Continue to implement the Housing Asset Management Plan
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Implementation of the
Housing Asset
Management Plan
action plan
PMI and Housing have reviewed the Council’s
approach to asset management against the recent
Scottish Government guidance and have developed an
action plan to assist in the implementation of a best
practice model. 
• We continue to
regularly review
our delivery of
the HAMP -
progress is
regularly 
2027  Senior Manager
(Property
Management and
Investment)
172

Page 173

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
30 
Scottish Housing Net Zeo Standard (SHNZS)
The Scottish Government published a consultation
paper regarding a new net zero standard for housing.
The proposed standard will replace the former energy
efficiency standards (EESSH and EESSH2) which form
part of the SHQS. 
Key changes to the new standards include:
• A new fabric efficiency rating (which focuses
on the amount of energy for heat consumed by
a property) measured in kWh/m2 /year (level
and date TBC).
• A requirement to replace polluting heating
systems with a clean heating alternative by a
backstop date of 2045 (interim targets TBC). 
Capital Programme Delivery
On-going delivery of the various capital programmes
continues, progress and budget implications are
reported regularly at the Joint Budget meeting and
Housing Asset Management Board. 
Statutory Compliance
Actions taken to improve access (end to end process
review, higher application of access policy, additional
staff resources) have seen an improvement in this area.  
24/25 performance:
Gas Safety: 99.99%
Smoke Detection: 100%
Electrical testing: 97.65% 
23/24 performance: 
Gas Safety: 99.79% 
Smoke Detection: 99.99% 
Electrical testing: 78.71%
monitored
through HAMB
reporting.
Alongside this an
Integrated Asset
Review is
underway with
regular meetings
of all
stakeholders,
and we continue
to work through
our action plan.
• Whilst we await
the outcome of
the Scottish
Government
consultation on
SHNZS, our
Pathfinder
project is
underway and
will see
physically works
carried out in
25/26, this will
inform the
Council’s longer-
term strategy in
relation to
SHNZS.
Alongside this
our Capital
Programmes
continue to
deliver
improvements to
our stock through
investment in
PV/EWI and
upgraded central
173

Page 174

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
31 
heating systems.
Progress in this
area will continue
to be reported
through our
regular Joint
Budget
Meetings, HAMB
and Scottish
Government
returns.
• In 25/26 we will
continue to
improve our
Statutory
Compliance
delivery, similar
to that used in
24/25 where we
saw increased
utilisation of our
forced entry
policy and
increased
resource to
create a
dedicated
compliance
team. This saw
substantial
improvement in
all areas of
compliance
which we wish to
sustain. 
LHS_41. Prevent housing crisis through early intervention by ensuring housing staff can identify the long term needs of tenants to
ensure housing is sustainable
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
174

Page 175

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
32 
All housing staff can
identify the long-term
needs of tenants,
including the
challenges facing
people with
neurodiverse issues
A ‘Home Visit Form’ has been developed that will be
completed by Housing Services staff during visits to
tenants’ homes. Following the completion of the form
the information will be used to update relevant systems
with up-to-date information and will be used to identify
support provision, repairing issues etc., within NAC
mainstream tenancies. 
Homelessness Working Group has been established
that incorporates frontline and management staff from
all Housing teams with a view to reviewing processes
and procedures that will maximise our opportunity to
prevent homelessness and increase sustainability. 
Enhanced housing options are available to all tenants
and applicants within all localities. 
Housing Options Toolkit to be promoted by all
managers and teams to complete all modules. Half day
closures to be used to allow staff time to complete
training. 
Multi-disciplinary teams in locality offices allow pre-
allocation discussions/checks prior to offers to ensure
that the offer is appropriate to the applicants and their
household needs. 
• DPIA form has
been completed
and is awaiting
sign off. When
agreed Officers
will be instructed
to use the new
home visit forms. 
• Homelessness
Strategy &
Prevention
Manager to
obtain current
licence list and
update staff
members. 
2024 31
December
2025
Senior Manager
(Neighbourhood
Housing &
Homelessness)
Team Manager
(Neighbourhood
Housing) 
LHS_42. Complete our Sheltered Housing Reprovisioning Programme by investing in 11 sheltered housing complexes over the
lifetime of this strategy
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Sheltered housing
complexes are
refurbished
The Barnett Court, Saltcoats refurbishment completed
in March 2024 and the Cheviot Court, Irvine
refurbishment completed in November 2024. 
• Refurbishment of
Vineburgh Court,
Irvine and Laigh
Court, Beith with
work anticipated
to start at these
units in early
2026.
• Draft plans
consultation took 
2028 31 March
2029
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Affordable
Housing &
Regeneration)
175

Page 176

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
33 
place at
Moorburn Park,
Largs in October
2024 and at
Regal Court,
Dalry in
December 2024.
Final plans for
these units are
currently being
prepared. 
LHS_43. Ensure that the Strategic Housing Investment Plan addresses current and future demographic needs
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Housing investment
priorities within the
Strategic Housing
Investment Plan align
to future and current
demographic needs
Demand for social housing is reviewed annually as part
of the development of each new SHIP.
• Development of
a performance
management
framework for
housing need
and demand. 
2023+ 31 March
2028
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Affordable
Housing &
Regeneration) 
LHS_44. Consider establishing a target for the delivery of accessible homes within the private sector
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
Local Development
Plan 3 sets out the
requirement for
accessible private
housing delivery
A Housing Evidence Paper, prepared to inform the
preparation of the LDP Evidence Report, was published
in December 2024 and reissued in March 2025 for
stakeholder comments. The paper considers the
requirement for a target for the delivery of accessible
homes within the private sector, noting that the
Government has committed to a new ‘Scottish
Accessible
Homes Standard’ which will be part of national building
standards by 2025/26. The accessible standard will see
accessibility designed and built into all new homes,
increasing the housing choices for people with
disabilities and reducing the need for expensive
retrofitting as people age or their needs change.
• Review
stakeholder
comments and
complete
Evidence Report,
setting out
evidence and
position on the
establishing a
target for the
delivery of
accessible
homes within the
private sector. 
2024 30 June
2027
Senior Manager
(Planning) 
Strategic Planning
Manager
176

Page 177

Appendix 1 - Local Housing Strategy 2023 – 2028 
Action Plan – Year 2 (2024/25) 
34 
The views of private sector housebuilders and others
on the need for a target for the delivery of accessible
homes within the private sector 
LHS_45. Review and update our Scheme of Assistance to:
• Ensure the promotion of positive outcomes for people living with autism in the private housing sector
• Ensure inclusive engagement with hard to reach groups 
• Ensure our literature is available in a format that is suitable for people with literacy and / or sensory / communication
issues
Desired Outcome  Latest update  Next Steps RAG
Status
Original
due date 
Revised
due date  Assigned to 
The publication of
information, sign
posting to advice
services and the
planned refresh of
the Scheme of
Assistance
The Scheme of Assistance is currently being reviewed
which will include the changes to the Repairing
Standard which came into force on 1 March 2024 and
the promotion of positive outcomes for people living
with autism in the private housing sector. Following
review, an action plan for consultation and engagement
will be implemented prior to presentation at the
appropriate Committee. The Scheme of Assistance will
be available in a format that is suitable for people with
literacy and/or sensory/communication issues. 
Housing staff, including the Private Sector Advice Team,
participated in an online training session in October
2024 ‘Introduction to Neurodiversity’ delivered by HSCP
and in association with an external partner. 
• Action plan for
consultation and
engagement will
be developed
and
implemented. 
31
December
2025 
Senior Manager
(Housing Strategy
& Development)
Team Manager
(Housing Strategy) 
177

Page 178

178

Page 179

NORTH AYRSHIRE COUNCIL
30 September 2025
Cabinet
Title: North Ayrshire Housing Allocations Policy 2025-30
Purpose: To seek approval from Cabinet of the North Ayrshire
Housing Allocations Policy 2025-2030.
Recommendation(s): That Cabinet approves the North Ayrshire Housing
Allocations Policy 2025-2030 at Appendix 1 for
implementation from 1st November 2025.
1. Executive Summary
1.1. The legislative and regulatory framework for the allocation of social rented
sector homes has evolved over time. Landlords have a duty to develop and
publish rules covering priority of allocation of houses, transfers and exchanges.
1.2. An allocation policy should set out clearly how the landlord will decide on
priority for housing. Landlords should take all relevant legislation into account
when developing or reviewing their allocation policy.
1.3. Although there is a clear legal framework within which allocation policies must
operate, within these parameters, landlords have discretion to develop their
allocation policy and practice to meet the needs of the communities in which
they operate.
1.4. This report provides an overview of the legal framework for social housing
allocations in Scotland, approaches to the consultation and development of the
policy, and proposed changes to the policy and subsequent allocation of social
housing under the North Ayrshire Housing Register (NAHR).
1.5. Members are invited to note the contents of the report and to approve the North
Ayrshire Housing Allocations Policy 2025-2030 for implementation from 1st
November 2025.
2. Background
2.1. The North Ayrshire Housing Allocation Policy (NAHAP) defines how social
housing in North Ayrshire will be allocated to applicants on the Common
Housing Register, known as the NAHR. NAHR partner landlords must ensure
that the NAHAP meets legislative and regulatory requirements, as well as the
standards and outcomes of the Scottish Social Housing Charter.
2.2. The NAHAP must seek to allocate housing stock fairly, taking into consideration
the housing needs and demands of local residents, and is the structured
framework by which NAHR landlords have jointly agreed to let their houses.
Agenda Item 6
179

Page 180

2.3. The legislative and regulatory framework for the allocation of social rented
sector homes continues to evolve over time. The NAHAP was developed in
accordance with the Housing (Scotland) Act 1987 (“the 1987 Act”), as amended
by the Housing (Scotland) Act 2001 (“the 2001 Act”), the Housing (Scotland)
Act 2014 (“the 2014 Act”) and other relevant legislation. It also aligns with the
Scottish Government’s Scottish Housing Allocations Practice Guide 2019.  
2.4. The 2014 Act amended section 20 of the 1987 Act and sets out three
categories of applicants who should be given reasonable preference in an
allocation policy.
These are:
• people who are homeless or threatened with homelessness and have
unmet housing needs
• people who are living in unsatisfactory housing conditions and have unmet
housing needs
• tenants of a social landlord who are under-occupied (i.e. not using all of
the bedrooms in the property they live in)
2.5. Allocation policies are additionally required to comply with the homelessness
rules set out in Part II of the 1987 Act (as amended by the 2001 Act and the
Homelessness etc. (Scotland) Act 2003 (“the 2003 Act”). This means that any
allocation policy should set out clearly how the landlord will decide on priority
for housing.
2.6. Guidance recommends that allocation policies should be reviewed regularly,
generally every three to five years or in response to major legislative change.
To plan and carry out the NAHAP review, representatives from the Council,
Cunninghame Housing Association, Riverside Scotland, Cairn Housing
Association convened regularly throughout 2023-24 to: 
• review the legislative changes
• identify the policy changes which may be required, addressing both the
local context and legislative changes
• consider and develop the consultation to be carried out, prior to the policy
review
• develop a revised allocations policy, following appropriate consultation 
2.7. The review was aligned to the Scottish Housing Allocations Practice Guide
2019 with NAHR partners developing a clear plan, setting out how key
stakeholders would be involved, key tasks to be undertaken, adequate
resources and realistic timescales, including sufficient time for consultation and
revision. The review was also informed by other factors including professional
officers’ experience of administering the policy, changes in housing need and
housing supply, alongside detailed modelling work to understand the impact of
the proposed changes.   
2.8. The NAHR is managed by North Ayrshire Council and four local housing
associations: 
180

Page 181

• Cunninghame Housing Association 
• Riverside Scotland (formerly Irvine Housing Association)
• Cairn Housing Association (formerly ANCHO)
• Trust Housing Association (joined as a NAHR partnership on 1 April 2025) 
2.9. Collectively, these five landlords own and manage around 98% of the social
housing stock in North Ayrshire. 
2.10. The NAHR is a ‘group plus points’ system, where people who apply are placed
into one of seven groups depending on their housing needs. The priority of the
applications in each group will be based on which people have the most points.
If two people have the same number of points, priority is given to the one who
applied first. Targets are set for the number of properties to be allocated to
each group, and this is called a letting plan. The targets are developed by
looking at the demand in the different groups. Each NAHR landlord has its own
letting plan. 
2.11. Table 1 provides a breakdown of the number of applicants - and those of whom
have an assessed housing need - in each group as at June 2025.
Table 1: Breakdown of Total Applications by Group/ Band (incl. Housing
Need)
NAHR Group/Band No. of Live
Applications
No. of Applicants in
Housing Need
1. Homeless 362 362
2. Strategic needs 45 45
3. Accessible housing needs 1,191 1,191
4. Transfer 1,183 507
(42.9%)
5. Overcrowded 622 622
6. General needs 2,316 696
(30.1%)
7. Outwith North Ayrshire 583 145
(24.9%)
TOTAL 6,302 3,568
(56.6%) 
2.12. As part of the NAHAP review, NAHR partners collaborated to carry out an
extensive consultation with tenants, prospective tenants (i.e., applicants on the
waiting lists), elected members and wider stakeholders, between 11 December
2023 and 21 January 2024. The focus of the consultation was to understand
views on the current Allocation Policy and identify opportunities to further
develop how we allocate social housing in North Ayrshire. The agreed key
areas of focus emerging throughout the consultation were: 
• Kinship care
• Adoption
• Care leavers and care experienced young people and adults
181

Page 182

• Domestic abuse
• Armed Forces and Veterans
• Home ownership
• Allocation policy types 
2.13. The consultation did not include a focus on suspension of applications for
refusal of reasonable offers of housing. The existing Suspensions Policy is a
sub-document of the Allocation Policy. Factoring into consideration
homelessness pressures, it is our intention to review the Suspensions Policy in
year 3 of the Allocations Policy, to align with the monitoring and evaluation
framework and allow further benchmarking, analysis and modelling work to be
undertaken on any options for change. 
2.14. In addition to a survey being launched to capture feedback, drop-in sessions
were held across various dates, times and localities to support stakeholders to
participate and share their views on the consultation. Briefing sessions were
held with elected members in December 2023, which included the seven key
focus areas of the policy review detailed above. A social media campaign was
launched via NAHR partners’ social media channels on 11 December 2023,
with posts providing QR codes and separate links to the consultation to
signpost and support stakeholders to participate. 
2.15. A key stakeholder event took place on 19 January 2024 with NAHR partners,
North Ayrshire Health and Social Care Partnership (HSCP), elected members,
third sector organisations (e.g. Women's Aid, CHAP, Veterans 1st Point, etc.)
and local tenants and residents’ associations. A total of 40 individuals attended
and participated in workshops, sharing views on the key areas of focus. 
2.16. A total of 883 responses were received to the consultation - the largest
response to date received for an NAHAP review. 
2.17. Regular meetings have been taken place with NAHR partners, and they are
satisfied that robust and comprehensive consultation has been provided and
that stakeholders were well informed and involved throughout the duration of
the consultation.
Current Position
2.18 The proposed revisions to the NAHAP have been developed by consulting
tenants, Registered Tenants Organisations, the North Ayrshire Network (NAN),
NAHR partners, other housing providers, independent advice agencies, elected
members, and relevant Council and HSCP colleagues.
2.19 Following consideration of the consultation findings, NAHR partners have
continued to meet regularly throughout 2024-25 to consider work undertaken by
Officers on modelling analysis of proposed changes.  This was to ascertain the
scale of impact to the NAHR, and housing needs and demands across North
Ayrshire’s communities. In conjunction with this, NAHR partners have been
consulting with the current allocations systems provider (Civica) to negotiate
and agree timescales and costs to update the existing system to reflect
potential operational changes to the allocation procedures.
182

Page 183

2.20 NAHR partners are committed to ensuring that the allocation process is
transparent and accountable. At the beginning of each financial year, NAHR
partners will set and publish grouped targets for the percentage of allocations
intended to offer applicants placed within each of the housing groups. The
targets will be set at local level and be informed by local housing
needs/circumstances as well as demand information summarised within local
letting plans. Local targets can be varied, to reflect differing housing needs
across our communities as they become transparent.  This will be regularly
reviewed through the monitoring process that will be in place with all NAHR
partners.
2.21 It is proposed that, following completion of additional preparatory work, North
Ayrshire Council letting plans, which support the Allocations Policy, will adopt a
transfer-led approach to release more homes for letting and to enable existing
tenants to move into properties better suited to their current and future housing
needs. This involves allocating from Group 4 (Transfers) for social housing
tenants to meet their housing need, which in turn frees up their existing
accommodation for a secondary let.
2.22 Following a review of the current NAHAP and national/local issues which have
been raised since its last revision in 2018, it is proposed that the NAHAP is
widened to give reasonable housing preference to the following groups of
applicants:
• Kinship carers
• Adoption
2.23 We have also reviewed our current practice in respect of the following groups
and identified actions:
• Foster carers
• Care experienced adults and care experienced young people
• Armed Forces
• Households under-occupying a property
• Accessible housing assessments
• Domestic abuse
• Home ownership
• Arran Local Lettings Initiative
2.24 The aims and objectives of the revised allocation policy are to:
• Support the development of active, inclusive and resilient communities
through the allocation of housing, in line with our Council Plan strategic
priority
• Meet all legislative and regulatory requirements for the allocation of
housing in North Ayrshire
• Maximise efficient use of the NAHR to respond to local housing needs,
demands and aspirations
• Prioritise applicants assessed as having the greatest housing need
• Ensure allocations are fair, transparent, and consistent in our approach to
the allocation of all NAHR housing
183

Page 184

• Promote an equalities-led approach to the allocation of housing in North
Ayrshire
• Undertake a thorough review of the policy in its third year of
implementation
• Take an equalities-based approach to ensure we have representative
engagement from across North Ayrshire’s communities prior to making
any changes to the policy
• Communicate any changes that we make to the policy to tenants, RTOs,
the NAN, and applicants
2.25 Through the NAHR Officer working group modelling analysis was undertaken
throughout 2024 to ensure the revised policy is fair, efficient, lawful, and
responsive to housing need. The following modelling analysis was considered
as part of the review:
• Housing needs and demand
• Supply
• Policy impact (e.g. scenario based)
• Equality impact assessment
• Legal and regulatory compliance
2.26 Table 2 below summarises proposed NAHAP changes and/or actions. Please
see Appendix 2 for full details on all changes and/or actions being proposed
and their rationale. All of these proposed changes have been the subject of
detailed modelling to understand impacts and benefits. 
Table 2: Breakdown of Proposed NAHAP Changes 
Current policy Proposed change/action
Kinship carers No additional points awarded
to applicants and currently
rehoused through Group 2 –
Strategic housing needs.
Award an additional 50 points to
applicants with a formal Kinship Care
arrangement where there is a specific
housing need identified (i.e.,
overcrowding) and remove the
requirement to utilise Group 2 –
Strategic housing needs.
Foster carers No additional points awarded
to applicants and currently
rehoused through Group 2 –
Strategic housing needs.  
NAHR partners propose to continue
the use of Group 2 – Strategic
housing need - in dialogue with the
HSCP but also award 50 points per
bedroom (for each additional room
required based on our occupancy
standard).
Adoption The current policy does not
recognise adoption as a
strategic housing need.
Include adoption, irrespective of
tenure, as a strategic housing need
utilising Group 2, where an additional
specific housing need (i.e.
overcrowding) is identified. Award 50
points per bedroom (for each
additional room required based on
our occupancy standard).
184

Page 185

Care
experienced
adults and care
experienced
young people
The current policy prioritises
North Ayrshire young people
when leaving care (via
Throughcare services).
Housing Options advice is
offered to young people who
have been care experienced,
through our Senior Housing
Officers, who receive specific
training regarding Care
Experienced young people.
NAHR partners will continue with
their commitment to prioritise those
who are care- experienced (both
young people and adults) under the
new Allocation Policy, reflecting the
work of the Brighter Pathways
Programme and revisions to the Care
Leavers Protocol.
Under-
occupation
The current policy awards 50
under-occupancy points per
bedroom where an applicant
is looking to downsize their
property. An example of this
would be where an applicant
in an existing 2-bedroom
property is looking to
downsize to a 1-bedroom
property; they will be
awarded 50 underoccupancy
points.
Continue to give reasonable
preference to those applicants who
are under-occupying their property
and award under-occupancy points,
however, to proactively allow us to
free-up larger properties, NAHR
partners propose to award 100
underoccupancy points per bedroom
for applicants in 3, 4, 5 and 6-
bedroom properties. 
An example of this would be where
an applicant in a 3-bedroom property
is looking to downsize to a 2-
bedroom property, they would be
awarded 100 underoccupancy points.
Armed Forces The current policy prioritises
applicants where they are
leaving the Armed Forces.
Additional points are applied
on receipt of the certificate of
discharge. Points are also
awarded for any other
housing needs specified in
the allocations policy. 
If an applicant does not
receive a suitable offer of
housing prior to the date they
are due to leave the Armed
Forces, these points will
remain in force for a period of
twelve months from receipt of
the certificate of discharge,
provided they have not
secured alternative
accommodation which they
have a legal right to occupy.
NAHR partners propose to continue
to award 150 points for those
individuals leaving the armed forces
12 months prior to discharge and up
to 12 months following discharge.
This demonstrates NAHR partners’
commitment to the UK Armed Forces
Covenant.
185

Page 186

Home
Ownership
Under the current policy, we
do not take homeownership
into consideration, although
the Housing (Scotland) Act
2014 allows for
homeownership to be taken
into consideration when
assessing an applicant’s
priority for social housing.  
NAHR partners propose to continue
to allocate housing to homeowners,
as we aim to better support
applicants as their housing needs
and priorities evolve.
Accessible
Housing
Assessment 
The current policy awards
150 accessible housing
points for the medium
accessible housing award.
NAHR partners propose to re-weight
and increase the medium accessible
housing award to 200 points to
improve positions on the NAHR and
ensure applicants are appropriately
prioritised ahead of applicants which
have the lower accessible housing
award with additional points.
Arran Local
Letting Initiative
The Arran Local Letting
Initiative (LLI), approved by
Cabinet on 27 April 2021,
allows certain NAHR
applicants to be entitled to
additional points if they live
on Arran and/or are
employed on Arran. The
additional award of points will
be added to any points
already accrued by
applicants, reflecting their
wider current housing needs
and circumstances.
NAHR partners propose to continue
with the Arran LLI to support
applicants to access appropriate
social housing on the island.
Domestic Abuse The current policy relies on
supporting victims fleeing
domestic abuse, deemed to
be at significant risk, through
Group 1 - Homeless.
There is a rising prevalence of
domestic abuse in North Ayrshire.
NAHR partners propose to award
300 points for applicants
experiencing domestic abuse where
they have been reviewed at MARAC
and considered as being at
significant risk and requiring
rehousing. This will proactively
support rehousing and mitigate
pressures on Group 1 – Homeless. 
2.27 NAHR partners agreed to continue with the current policy of not taking home
ownership into consideration, although the 2014 Act allows for homeownership
to be considered when assessing an applicant’s priority for social housing (i.e.,
landlords may assess whether an applicant, or someone who will reside with
them, owns or has previously owned heritable property in Scotland, the wider
UK, or abroad). 
186

Page 187

2.28 Landlords may decide to give a lower priority to applicants who are
homeowners. However, they are not obligated to do so and may choose to
allocate housing to homeowners in certain circumstances. For example, if an
applicant is in a property that does not meet their needs (e.g. accessible
housing needs) and/or requires rehousing, a landlord may still allocate social
housing to them. 
2.29 NAHR partners agreed to continue to allocate housing to homeowners to better
support applicants as their housing needs and priorities evolve, especially
around the ageing demographic and requirement for accessible homes within
North Ayrshire. 
2.30 A paper was presented previously to Elected Members in April 2024 which
provided details of both a ‘group plus points’ allocation system and separately a
‘Choice-Based’ Letting (CBL) model.  It continues to be the view of Officers
from the NAHR Partnership that the current ‘group plus points’ allocation
system is most effective approach to ensure allocations are being made to
people in the greatest housing need. Given the well-documented national
housing pressures, it was the view of the Partnership that any further
exploration of this model should be deferred until the next Allocation Policy
review, which will be scheduled for 2028-29.
2.31 NAHR partners have all approved the revised NAHAP for implementation from
1st November 2025, although the NAHAP is still to be formally ratified by
Riverside HA’s board and this is scheduled for 24th October 2025. NAHR
partners are also reviewing the monitoring framework to ensure that the policy
aims are being met and will report policy outcomes to all relevant stakeholders
(incl. tenant representatives) through appropriate channels.  
3. Proposals
3.1. It is proposed that Cabinet approves the North Ayrshire Housing Allocations
Policy 2025-2030 at Appendix 1 for implementation from 1st November 2025.
4. Implications/Socio-economic Duty
Financial 
4.1. Any financial implications arising from developing systems and altering
approaches to the allocation of social housing under the North Ayrshire
Housing Allocation Policy 2025-2030 are accounted for within existing capital
and revenue budgets. Where necessary, business cases will be developed to
support any alternative approaches to allocations. 
Human Resources
4.2. The North Ayrshire Housing Allocation Policy 2025-2030 will be delivered by
NAHR partner staffing (including North Ayrshire Council Housing Service staff)
and complemented by cross service expertise, where required. 
Legal
187

Page 188

4.3. The development and monitoring of the North Ayrshire Housing Allocation
Policy 2025-2030 sets out NAHR partners collective approach to the allocation
of social housing in North Ayrshire and ensures compliance with the legislative
and regulatory framework for the allocation of social housing in Scotland. 
Equality/Socio-economic 
4.4. The allocation and provision of housing under the North Ayrshire Housing
Allocation Policy 2025-2030 has a positive impact for persons who are
homeless or threatened with homelessness, care experienced adults and care
experienced young people, older people, children, younger people, people with
disabilities, etc. There are no negative or discriminatory effects on any of the
equality groups as a result of the implementation of the policy. 
Climate Change and Carbon 
4.5. The North Ayrshire Housing Allocation Policy 2025-2030 will continue to
support the Sustainable North Ayrshire Strategy 2024 - 2027,which aims to
eradicate fuel poverty and achieve net-zero carbon status by 2030. 
Key Priorities 
4.6. The North Ayrshire Housing Allocation Policy 2025-2030 continues to support
the Council Plan strategic priorities: ‘Wellbeing;’ ‘Climate Change;’ ‘A
Sustainable Council;’ and ‘Communities and Local Democracy.’ The policy also
aims to support our island communities and their economies through our
approach to allocations and tenancy sustainment. 
Community Wealth Building 
4.7. Approaches to allocations detailed within the North Ayrshire Housing Allocation
Policy 2025-2030 supports North Ayrshire Community Benefits and aligns with
the Council’s Local Housing Strategy 2023-28 outcomes. 
Islands Communities Impact Assessment (ICIA) 
4.8. The North Ayrshire Housing Allocation Policy 2025-2030 acknowledges that
there are unique impacts faced by our islands and includes measures to
address these. Whilst some policy interventions will be tailored to our islands, it
is to ensure the islands enjoy the same opportunities as living on the mainland. 
United Nations Rights of the Child (UNCRC) 
4.9. The North Ayrshire Housing Allocation Policy 2025-2030 indirectly affects
children and young people. The following groups of children and young people
have been identified as those potentially affected by the North Ayrshire Housing
Allocation Policy 2025-2030: 
• From low-income households
188

Page 189

• Living in deprived areas
• At risk of homelessness or homeless
• Victims of domestic abuse/part of a family affected by domestic abuse
• Looked after/accommodated children and young people
• Care experienced young people/young people leaving care
• Those with a protected characteristic 
Consumer Duty  
4.10.  None. 
5. Consultation
5.1 The development of the North Ayrshire Housing Allocations Policy 2025-2030
has been prepared by working in partnership with NAHR partners and cross
service leads. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Andrea Elliot, Senior Manager
(Neighbourhood Housing & Homelessness), on andreaelliot@north-
ayrshire.gov.uk or 01294314630. 
Background Papers
Appendix 1 Cabinet Paper NAHR Allocations Policy 2025
Appendix 2 Allocations Policy
189

Page 190

1 
Appendix 1 - North Ayrshire Housing Allocations Policy 2025-30
Contents
Section Page Number
Section 1 - Introduction
1.1 Background
1.2 The allocations framework
1.3 The Scottish Social Housing Charter
1.4 Aims of the policy
1.5 Consultation 
1.6 North Ayrshire Council Privacy
Statement
1.7 NAHR Privacy Statement 
1.8 Equal opportunities 
03
03
03
03
04
05
05
05
05
06 
Section 2 - Applying for a house
2.1 NAHR Housing Options Wizard
2.2 Who can apply for housing?
2.3 How to apply for housing
2.4 Processing applications
2.5 Applying for sheltered housing
2.6 Applying for amenity or adapted
housing
2.7 Mutual exchange
2.8 Applicant choice 
2.9 Areas of choice 
2.10 Joint applications 
2.11 Common Housing Register - Joint
working arrangements
06
06
06
07
07
07
07
07
08
08
08
08
09
Section 3 – Our allocation system
3.1 Understanding housing need
3.2 Reasonable preference groups
3.3 The groups plus points system
3.4 Our groups and placing applications  
3.5 Assessment of housing need
10
10
11
11
11
14
Section 4 – Making an offer of
housing
4.1 Offers
4.2 Tenancies
4.3 House size
4.4 Occupancy standard for assessing
over and under-occupation
4.5 Rules on overcrowding
4.6 Under-occupation
4.7 Local Letting Plans
4.8 Refugee Resettlement Programmes
4.9 Gypsy/Travellers
4.10 Harrassment
4.11 Domestic abuse and/or violence
4.12 Council employees and Elected
Members
22 
21
23
23 
24
25
25
25
26
26
26
27
28 
190

Page 191

2 
4.13 NAHR partner employees and
committee (or board) members
28
Section 5 – Managing housing
applications
5.1 Reviewing housing applications
5.2 Change of circumstances and
preferences
5.3 Cancellation of housing applications 
5.4 Suspension of housing applications 
29 
29
29
29
30
30
Section 6 – Monitoring and reviewing
performance
6.1 Setting targets
6.2 Auditing performance
6.3 Monitoring performance
30 
30
31
31
Section 7 – Complaints and appeals
7.1 Appealing a decision
7.2 Making a complaint
31
31
31 
191

Page 192

3 
Section 1 - Introduction
1.1 Background
The North Ayrshire Housing Allocation Policy (herein the policy) defines how social
housing in North Ayrshire will be allocated. Following consultation, the policy was
approved by North Ayrshire Council (herein the Council) Cabinet on 30 September
2025 and is effective from 1 November 2025. 
The policy was developed in accordance with the Housing (Scotland) Act 1987 (“the
1987 Act”), as amended by the Housing (Scotland) Act 2001 (“the 2001 Act”), the
Housing (Scotland) Act 2014 (“the 2014 Act”) and other relevant legislation. It also
aligns with the Scottish Government’s Scottish Housing Allocations Practice Guide
2019. 
1.2 The Allocations Framework
The legislative and regulatory framework for the allocation of social rented sector
homes continues to evolve over time, including through the 1987 Act, the 2001 Act
and the 2014 Act.
Allocation policies are additionally required to comply with the homelessness rules
set out in Part II of the 1987 Act (as amended by the 2001 Act and the
Homelessness etc. (Scotland) Act 2003 (“the 2003 Act”). Landlords also have a duty
to make and publish rules covering priority of allocation of houses, transfers and
exchanges (section 21 of the 1987 Act, as amended by section 155 of the Leasehold
Reform, Housing and Urban Development Act 1993 and the 2001 Act). This means
that any allocation policy should set out clearly how the landlord will decide on
priority for housing. 
Landlords should take any other relevant legislation into account when developing or
reviewing their allocation policy. Although there is a clear legal framework within
which allocation policies must operate, within these constraints, landlords have
considerable discretion to develop their allocation policy and practice to meet the
needs of the communities in which they operate. 
1.3 The Scottish Social Housing Charter 
The Scottish Social Housing Charter (the Charter) sets out the outcomes and
standards that all social landlords should be delivering for their tenants and other
customers. 
The policy aligns with the following Charter Outcomes:
Equality
• Outcome 1: Every tenant and other customer has their individual needs
recognised, is treated fairly and with respect, and receives fair access to
housing and housing services. 
192

Page 193

4 
Communication
• Outcome 2: Tenants and other customers find it easy to communicate with
their landlord and get the information they need about their landlord, how and
why it makes decisions and the services it provides.
Participation
• Outcome 3: Social landlords manage their businesses so that tenants and
other customers find it easy to participate in and influence their landlord’s
decisions at a level they feel comfortable with.
Housing options
• Outcome 7: People looking for housing get information that helps them make
informed choices and decisions about the range of housing options available
to them.
• Outcome 8: Tenants and people on housing lists can review their housing
options.
• Outcome 9: People at risk of losing their home get advice on preventing
homelessness.
Access to social housing
• Outcome 10: People looking for housing find it easy to apply for the widest
choice of social housing available and get the information they need on how
the landlord allocates homes and their prospects of being housed.
Tenancy sustainment
• Outcome 11: Social landlords ensure that tenants get the information they
need on how to obtain support to remain in their home; and ensure suitable
support is available, including services provided directly by the landlord and
by other organisations.
Homeless people
• Outcome 12: Homeless people get prompt and easy access to help and
advice; are provided with suitable, good-quality temporary or emergency
accommodation when this is needed; and are offered continuing support to
help them get and keep the home they are entitled to.
The Scottish Housing Regulator (SHR) monitors, assesses and reports on landlords’
performance against the Charter. All social landlords submit an Annual Return on the
Charter (ARC) to the SHR and the SHR publishes performance information for each
landlord on their website.
1.4 Aims of the policy
This section describes the aims and objectives of the allocation policy. 
• Maximise efficient use of North Ayrshire Housing Register (NAHR) housing to
respond to local housing needs, demands and aspirations.
193

Page 194

5 
• Prioritise applicants assessed as having the greatest housing need. 
• Support the development of active, inclusive and resilient communities
through the allocation of housing. 
• Ensure we are fair, transparent, and consistent in our approach to the
allocation of all NAHR housing. 
• Meet all legislative and regulatory requirements for the allocation of housing in
North Ayrshire. 
• Promote an equalities-led approach to the allocation of housing in North
Ayrshire.
NAHR partners have developed a monitoring framework to ensure that the policy
aims are being met. We will report policy outcomes to all relevant stakeholders (incl.
tenant representatives).
1.5 Consultation
The Housing (Scotland) Act 2014 requires the social landlords to prepare and
publish a report on the consultation carried out during the development of the
allocation policy. A copy of the consultation report can be made available upon
request.
1.6 North Ayrshire Council Privacy Statement
The Council is a local authority established under the Local Government etc.
(Scotland) Act 1994 and is registered with the Information Commissioner's Office
(ICO) as a data controller (registration number Z4840237). The Council gathers and
processes information about you for a range of purposes, including to ensure:
• That services can be delivered effectively and efficiently
• To manage the employment relationship with our employees
Your privacy is important to us.
All employees who have access to your personal data, or are associated with the
handling of that data, are obliged to comply with the Data Protection Act 2018.
The Council’s Privacy Statement details how we will look after your information.
1.7 North Ayrshire Housing Register Privacy Statement
The NAHR is a partnership operating the Common Housing Register in North
Ayrshire. It gathers and processes information about you so that services you
request in relation to housing can be delivered effectively and efficiently. We regard
your privacy as important and all employees who have access to your personal data,
or are associated with the handling of that data, are obliged to comply with the Data
194

Page 195

6 
Protection Act. The NAHR Privacy Statement details how we will look after your
information.
Each partner is responsible for managing information securely. Individual NAHR
privacy statements can be found on their websites.
1.8 Equal Opportunities
NAHR partners are committed to the principle that everyone has the right to be
treated with dignity and respect. In relation to the allocation of social housing, this
policy ensures that the NAHR partners act fairly, with transparency, and lawfully.
NAHR partners do not discriminate against applicants in any way on the grounds of
age, disability, gender reassignment, race, religion or belief, sex, sexual orientation,
marriage and civil partnership, and pregnancy and maternity.
To support this and as part of the development of the policy, an Equality Impact
Assessment has been carried out to ensure that the policy is inclusive and does not
unfairly disadvantage any of the groups detailed above. A copy of the impact
assessment can be made available upon request. NAHR partners will monitor the
policy to ensure that it achieves all equalities objectives set.  
If any applicant feels that they have been treated unfairly they have the right, through
the appeals process, to have their case reviewed (see Section 7.1).
If you require this information in another language or format, please contact us to
discuss how we can best meet your needs. Phone 01294 310000 or email
commonhousingregisterteam@north-ayrshire.gov.uk. 
Section 2 – Applying for a house
2.1 North Ayrshire Housing Register – Housing Options Wizard
It is important that people have the information that they need to make informed
choices about their housing options. 
The NAHR website provides an online information system (‘Housing Options
Wizard’) to support individuals to understand their Housing Options in North Ayrshire.
It is a self-assessment service that asks a few simple questions about an individual’s
circumstances. Once all the questions are completed, the NAHR website will provide
a personal plan detailing housing options that are most appropriate.
Applicants can access the NAHR website at https://www.northayrshirehr.co.uk/ 
2.2 Who can apply for housing?
In accordance with the terms of the 1987 Act, as amended by the 2001 Act, anyone
aged 16 years or over can join a housing register. You can apply as a single
applicant, or with other persons (see Section 2.10 – Joint applications) provided they
are not prevented from doing so by immigration or any other relevant legislation. 
195

Page 196

7 
2.3 How to apply for housing
Application forms can completed online via our website, or support to complete a
form will also be made available across our local housing offices.
In line with our equality commitments (see Section 1.8 – Equal Opportunities), this
can be made available in different languages and in other formats, such as large
print. We can also arrange for interpreting services (incl. for hearing impairments),
where necessary, and will meet relevant costs. 
Upon request, we will assist applicants to complete their application form. Applicants
can use our online services to apply for housing, update an existing application,
review housing options, contact us and search and apply for a mutual exchange.
Information on applying for a house is available from the NAHR website at
https://www.northayrshirehr.co.uk/
2.4 Processing applications 
When processing and reviewing applications for housing, we will:
• Aim to assess completed application forms within ten working days from
receiving them;
• Send you a letter advising you what group we have put your application in and
the number of points you have been awarded; and
• Review your housing application at least once per year (see Section 5.1).
2.5 Applying for sheltered housing
Sheltered housing is for persons aged 60 and over and provides housing support
services and, in certain circumstances, an alert response service for emergencies. It
is intended for people who require some support to live independently and who may
have a medical condition which makes their current home unsuitable.
While the process for applying for sheltered housing is the same as detailed at 2.3,
there are additional qualifying requirements in relation to the allocation of sheltered
housing. Our website provides further details on how to apply for sheltered housing
and how sheltered properties are allocated in North Ayrshire. 
Further information on applying for sheltered housing can be found at
https://www.north-ayrshire.gov.uk/housing/amenity-and-sheltered-housing 
2.6 Applying for amenity or adapted housing
A number of properties have been purpose built or adapted to meet specific needs of
different groups of applicants, for example, older people, people with a disability
and/or with restricted mobility. Priority for this type of accommodation is given to
those who have been assessed as having appropriate needs.
Further information on applying for amenity housing can be found at
https://www.north-ayrshire.gov.uk/housing/amenity-and-sheltered-housing 
196

Page 197

8 
2.7 Mutual exchange
A mutual exchange is where two, or more, tenants swap homes with each other. This
is a good opportunity to find a new home when there are a lot of people on the
NAHR.
Council tenants can exchange homes with:
• Another North Ayrshire Council tenant
• Any other tenant of a UK housing association
• Any other tenant of a UK council
Further information on applying for mutual exchange can be found at
https://www.north-ayrshire.gov.uk/housing/managing-your-tenancy/council-house-
mutual-exchange 
2.8 Applicant choice
The allocation system (see Section 3) ensures that applicants’ choices are factored
into consideration. Applicants can state their preferences from a number of factors,
such as:
• Preferred area and streets
• House types
• Floor level
• Amenities, such as gardens, etc.
• Heating types 
Applicants are also permitted to state where they don’t want to be considered in
respect of the above factors.
It’s important to understand that an applicant’s choice of housing may be impacted
by legal requirements and/or relevant guidance that the Council is obligated to follow.
Applicants’ choices are subject to the availability of housing. Although applicants can
request housing in particular areas, the prospects of housing will vary from area-to-
area based on the number of houses available for let and tenancy sustainment (i.e.
how long tenants remain in lets for).
2.9 Areas of choice
The NAHR partner’s housing stock is divided into management areas and within
each area; the housing stock is further divided into a number of letting areas. Letting
areas vary in size, however they generally reflect areas that are commonly
recognised and requested by applicants. 
Applicants can apply for housing in any area of North Ayrshire and can select as
many letting areas as they wish.
2.10 Joint applications for housing
There are circumstances where applicants may decide to submit a joint application
for housing with someone else. 
197

Page 198

9 
Applicants who currently live separately
Applicants who live separately are assessed on the combined housing needs of the
household.
Where one or both applicants have previously made an application for housing, the
joint application will be assessed based on the combined needs of the household.
Points are awarded based on the applicant who has the highest level of assessed
housing need points, and the earliest date of application. 
Applicants who have moved in together
Where two applicants have separate existing applications for housing and thereafter
move in together, their circumstances will be re-assessed on a joint basis according
to their current housing circumstances, and earliest date of application.
In both circumstances above, should applicants wish to be considered individually for
housing, their application will be assessed from the original date of application and in
accordance with their current housing circumstances. 
2.11 Common Housing Register - joint working arrangements
The Council operates a Common Housing Register (the NAHR) with a number of
Registered Social Landlords (RSLs) with properties across North Ayrshire.
The NAHR makes it straightforward for applicants to apply for housing with the
Council and participating RSLs, through a single housing application form.
More details on the NAHR and partner RSLs can be found on the NAHR website at
https://www.northayrshirehr.co.uk/
In addition, joint working arrangements are in place with other RSLs who are not part
of the NAHR, however have housing stock in North Ayrshire.
Referral of homeless applicants to RSLs
Aligning with Section 5 of the 2001 Act and assisting with meeting demand for
housing from homeless applicants, the Council can request that RSLs with
properties within North Ayrshire provide applicants with housing if they have been
assessed as homeless. This is known as a Section 5 referral. We predominately
utilise the nominations process (see below) due to the limited number of properties
held by non-NAHR RSLs. 
Prior to a Section 5 referral, the Council will take into consideration an applicant’s
needs and preferences and the availability of suitable housing. The key aim of the
Section 5 referral is to ensure that applicants are housed appropriately and as
quickly as possible. 
198

Page 199

10 
Nominations agreements
The Council works in partnership with certain RSLs to agree and implement a
nomination process for allocations whilst ensuring systems are in place for
monitoring.
When applying for housing, applicants can select other RSLs who have housing in
areas they have chosen.
Section 3 – Our allocations system  
This section explains what type of allocation system the NAHR partners operate in
North Ayrshire to ensure we meet our policy objectives effectively. In this section we
will cover:
• What we mean when we consider ‘housing need’
• What ‘reasonable preference’ is and where it will apply
• The groups plus points allocations system the NAHR partners work within
• How we group and place applications
• How we assess housing needs and what points we award/apply
3.1 Understanding housing need
A significant role of our policy is to address housing need. It is important that we
define what we mean when we refer to ‘housing need’. In this policy, we define
housing need by reference to:
• Legal requirements in relation to homelessness, the tolerable standard and
under-occupation. These define minimum acceptable housing conditions and
occupancy levels. 
• Professional standards, for example, we regard households as being
overcrowded if they do not meet our occupancy standard. 
• Social standards that take account of applicants’ preferences and aspirations. 
• Affordability of housing, for example, applicants may become homeless in the
private sector because they cannot afford to pay mortgage costs. 
• Unsatisfactory housing including accessibility needs.
We assess levels and types of need on a regular basis through our individual Letting
Plans. A Letting Plan is the method used to identify and address housing needs.
Some of the factors that we consider when assessing needs are:
• Numbers of applicants on the NAHR.
• The preferences and circumstances of applicants.
• Supply and turnover of the housing stock that is available for letting. 
199

Page 200

11 
3.2 Reasonable preference groups
The 2014 Act amended section 20 of the 1987 Act and sets out three categories of
applicants who should be given reasonable preference in an allocation policy. These
are:
a) people who are homeless or threatened with homelessness and have unmet
housing needs
b) people who are living in unsatisfactory housing conditions and have unmet
housing needs
c) tenants of a social landlord who are under-occupied (not using all of the
bedrooms in the property they live in)
There are specific laws which determine our responsibility towards supporting those
who present as homeless or are threatened with homelessness. The Council has a
separate Homelessness Policy which can be made available upon request. 
3.3 The groups plus points system
The groups plus points system establishes groups with applications placed into the
appropriate group. Applicants in each group are awarded points recognising their
housing needs.
Where applicants have the same points and are placed within the same group,
applications are thereafter prioritised by the date of application. Therefore, if two
applicants have the same points, the applicant who registers first will be given
greater priority.
We use Letting Plans to assess the target of lets to be allocated to each group (see
Section 6.1). These targets vary and are revised based on housing needs and stock
available for letting. 
NAHR partners follow the general rules detailed in this policy. Individual partners
may vary their targets of lets allocated to groups within their own areas. This is
necessary to ensure that we take account of both local housing stock and needs.
The policy notes where individual partners have developed specific procedures to
address local circumstances.
3.4 Our groups and placing applications 
The NAHR is made up of seven groups. Applications will be assessed according to
the individual circumstances of the applicant and placed on one of the following
seven lists:
Group 1 – Homeless
If an applicant is determined as homeless, their application is placed in Group 1.
Group 1 is used for homeless persons and persons threatened with homelessness,
who have unmet housing needs and to whom the Council has a legal duty to provide
permanent accommodation under the 1987 Act, as amended by the 2001 Act, the
Homelessness Etc. (Scotland) Act 2003, and the 2014 Act.
200

Page 201

12 
You are homeless or threatened with homelessness if:
• You have no accommodation that you can legally reside in or are likely to become
homeless within 6-months.
• Your family, who normally live with you, are forced to live apart as you have no
accommodation you can live in together.
• You have accommodation, but you have, for example, been illegally evicted, or
forcibly prevented from living in it.
• You may be at risk of violence from someone living in the accommodation if you
continue to live there.
Under the Council’s Homelessness Policy there are protocols for dealing with
applicants affected by homelessness and those threatened with homelessness.
‘Threatened with homelessness’ refers to anyone who is likely to become homeless
within 6 months. This policy is used to address the needs of all people affected by
homelessness, including people experiencing domestic abuse.
An important part of this policy involves the prevention of homelessness, as well as
working in partnership with other housing providers to reduce homelessness. The
Council has a separate Homeless Prevention Strategy which outlines how we aim to
mitigate homelessness and support those threatened with homelessness. 
In general terms, every attempt will be made to offer homeless people genuine
choice of accommodation, as this is more likely to ensure sustainability. However,
the Council recognises that demand for housing within some areas of North Ayrshire
is exceptionally high, and turnover is low. As such, the urgency of the housing need
of the applicant will be compared to availability of housing across the Council and
NAHR partners, and the competing demands from other applicants in housing need.
The Council will seek to utilise public and private sector housing throughout North
Ayrshire to fulfil statutory duties. An assessment of the most appropriate source of
housing for the applicant will be undertaken and duty equally discharged across
either option. Nomination Agreements and Section 5 protocols with local RSLs (who
are not partners) are in place and are monitored and reported quarterly to ensure
compliance.
The proportion of housing allocated to people affected by homelessness is relatively
high given:
• the number of applicants affected by homelessness; and
• legal obligations under homelessness law to re-house homeless people.
Homelessness advice can be found on the Council’s website at https://www.north-
ayrshire.gov.uk/housing/homelessness-support/homelessness-advice 
Group 2 – Strategic housing needs
If an applicant has a strategic housing need which is not able to be adequately
addressed elsewhere in the policy, their application is placed in Group 2. This applies
even if the applicant has other housing needs.
201

Page 202

13 
This group assists us to address strategic policy objectives at local level. These
objectives relate to strategic matters such as:
• Demolition and regeneration initiatives
• Community care and other support needs, such as:
o Adoption
o Foster carers
o People re-housed through care initiatives
• People housed through resettlement programmes
• Needs not covered by policy.
Group 3 – Accessible housing needs
If an applicant requires accessible housing as their current home does not meet their
needs due to their health or a disability (as assessed by our occupational therapists)
and they are not covered by either Group 1 or 2, their application is placed in Group
3. This applies even if the applicant has other housing needs.
Group 4 – Transfers
Applicants will be placed on the ‘transfer’ list if their housing needs do not make
them eligible for Groups 1 – 3 and they are:
• A tenant of North Ayrshire Council; or
• A tenant of a NAHR partner living in North Ayrshire. 
This applies even if the applicant has other housing needs.
A separate transfer group is important to meet policy objectives for the following
reasons:
• It promotes households to move to other accommodation, in turn releasing
stock for other applicants (otherwise known as secondary lets). 
• It addresses the preferences of existing tenants, which is important as
preferences are a form of housing need. 
• Meeting the needs of tenants is important to establish active, inclusive and
resilient communities.
Group 5 – Overcrowded
If an applicant is living in overcrowded conditions and not in any of the above groups,
their application is placed in Group 5. This applies even if the applicant has other
housing needs.
We will give reasonable preference when letting houses to households that are
overcrowded, or people with large families.
A household is defined in this policy as any person(s) wanting to live separately, for
example, a family member no longer wanting to reside with her/his parents. 
202

Page 203

14 
Group 6 – General needs
If an applicant has not been placed in any of the above groups and they currently live
in North Ayrshire or meet the legal criteria if they live out with North Ayrshire, their
application is placed in Group 6. 
‘General needs’ recognise other housing needs such as insecurity of accommodation
and households who want to move into the social rented sector.
Group 7 – Relocation needs
All other applications are placed in Group 7.
Following the Scottish Government’s Scottish Housing Allocations Practice Guide
2019, we do not consider local residence if an applicant:
• Is employed or has been offered employment in the area
• Wishes to move into the area to seek employment and we are satisfied that
this applies
• Wishes to move into the area to be near a relative or carer
• Has special social or medical reasons for requiring to be re-housed in the
area
• Is subject to harassment and therefore wishes to move into the area
• Runs the risk of domestic violence and therefore wishes to move into the area
Applicants who live out with North Ayrshire and who do not meet the above legal
factors will have their application placed in Group 7. Applicants who meet the factors
will have their application placed in the appropriate group where their circumstances
meet the necessary requirements for that group.
Applicants in Group 7 will receive all points to which they are entitled.
3.5 Assessment of Housing Need
Applicants are awarded points for any housing needs that they have. There is no
maximum number of points that will be awarded to applicants. This section of
the policy explains the points awarded for each category of housing need available
to applicants.
Foster carers and adoption
Foster carers and those who adopt can apply for housing with an extra bedroom so
that fostering and adoption can occur. They will receive points if their existing house
lacks the necessary additional bedroom. A protocol has been agreed with North
Ayrshire Health and Social Care Partnership that identifies foster carers and those
who adopt; applicants within this category will be allocated additional points.
Points awarded: 50 per bedroom (for each extra room required based on our
occupancy standard) 
203

Page 204

15 
Kinship care
‘Kinship care’ is where a child is unable to live with their birth parent and resides
instead with a relative or other individual with whom they have a pre-existing
relationship (e.g. a sibling, or close family friend), as outlined in the Looked After
Children (Scotland) Regulations 2009. The carer is referred to as a kinship carer. 
Applicants with a Formal Kinship Care Arrangement that results in overcrowding can
apply for housing for the necessary additional bedroom(s). They will receive points if
their existing house lacks the necessary additional bedroom. A protocol has been
agreed with North Ayrshire Health and Social Care Partnership that enables Formal
Kinship Care Arrangements to be allocated points within this category. 
Points awarded: 50 per bedroom (for each extra room required based on our
occupancy standard)
Houses subject to demolition or regeneration
Applicants whose houses are subject to demolition or regeneration due to action
taken by us and who require permanent re-housing are regarded as being in
strategic housing need.
Points awarded: 250
Applicants who are temporarily accommodated elsewhere and wish to return to the
regeneration area are also awarded points to enable them to return to their
community.
Points awarded: 250
People re-housed through care and support initiatives
This covers applicants who need to be housed as part of community care initiatives.
Applicants are referred through the North Ayrshire Health and Social Care
Partnership or other support agencies with whom referral procedures have been
established. We may also establish specific procedures with other statutory and
voluntary sector agencies.
Examples of such groups are as follows:
• Young people “looked after” and accommodated by the Council 
• Residents of hospitals and other institutions who are returning to the
community, including people returning following closure of the institution in
question 
• Residents in supported accommodation establishments who are now ready to
move to other accommodation 
204

Page 205

16 
Care experienced adults and care experienced 
The Scottish Government aims for Scotland to be the best place in the world for
children and young people to grow up. Central to this aspiration is the recognition
and promotion of children’s rights. As well as the national legislative and policy
drivers such as the Children and Young People Act (Scotland) 2014, Getting it
right for every child (GIRFEC) and The Promise Scotland, Scotland also has
duties to secure and enact the rights enshrined in the United Nations Convention
on the Rights of the Child (UNCRC).
A care experienced adult is a young person aged 16-25 years old who has been
'looked after' at some point since they were 14 years old and were in care on or
after their 16th birthday.
The term ‘care-experienced’ refers to anyone who has been or is currently in care
or from a looked-after background at any stage in their life, no matter how short,
including adopted children who were previously looked-after.
The Council places the health, welfare and development of children and young
people, at the centre of the planning and delivery of services. This is recognised
within our Housing Social Services Care Leavers Protocol and Procedure.
The Council offer an integrated and co-ordinated service which aims to ensure
that no care leaver will become homeless on leaving care, residential, foster or
Kinship Care and will provide the necessary support to ensure a care leaver can
achieve independence and stability within the community.  
The Protocol promotes the principle that care leavers will be provided with the
securest form of tenancy available to them, dependant on support needs and
independent living skills. The Protocol is an inter-agency departmental agreement
between Housing and the Heath & Social Care Partnership, detailing the joint
response to the support and accommodation needs of care experienced adults
and those who are care experienced.
Points awarded: 150 for Throughcare Protocol applicants 
Points awarded: 150 for Other Care in Community
Needs not covered by policy
We apply this section of the policy only in extenuating (i.e. justifiable) circumstances
if the policy does not address the housing needs in question. Should this apply, we
will award points only after each case has been fully investigated and evidence
gathered, as appropriate. To ensure accountability, each case must be approved by
Senior Management in each NAHR partner organisation. The points award is
withdrawn if their housing need is resolved prior to an offer being made. These cases
are scrutinised and monitored closely and, if unique circumstances occur, they will
be considered further within future policy reviews.
Points awarded: 300 
205

Page 206

17 
Experiencing Domestic Abuse and/or Violence 
The Domestic Abuse (Scotland) Act 2018 came into force on 1 April 2019. The Act
created a new statutory offence of engaging in a course of behaviour which is
abusive of a partner or ex-partner.
Thereafter, the Domestic Abuse (Protection) (Scotland) Act 2021 came into force on
5 May 2021 and provides new and improved protections, to complement the existing
measures, for victims of domestic abuse. 
The Housing (Scotland) Bill introduced a requirement for social landlords to develop
and implement a domestic abuse policy, setting out how they will support persons at
risk of homelessness due to domestic abuse.
The Council is committed to supporting victims of domestic abuse and/or violence.
This is outlined within the North Ayrshire Domestic Abuse Policy – All Tenures.
The Council hosts routine Multi Agency Risk Assessment Conferences (MARAC).
These meetings enable representatives from statutory and non-statutory agencies to
discuss and manage the highest risk domestic abuse cases. Where it has been
considered by MARAC and highlighted that a housing situation could be a risk factor,
additional points will be applied.
Points awarded: 300
Housing below the Tolerable Standard
The 1987 Act (as amended) introduced the Tolerable Standard. It is a minimum
standard that applies to all residential dwellings including social and privately rented
homes and owner-occupied properties.
A house is below the tolerable standard if it fails to meet any one of the elements
within the Tolerable Standard.
For example, a house must be substantially free from rising or penetrating damp and
must have a sink that has a supply of both hot and cold water. Applicants whose
housing is below the tolerable standard may apply for housing under the
homelessness policy.
A protocol is in place to support private tenants who indicate they have repairing
issues within their property; when completing an application for housing, they are
directed to the Below Tolerable Standard Request form - Below Tolerable Standard
Request
This process ensures that, before being considered for rehousing, the private tenant
must have reported the problem to their landlord/letting agent in the first instance,
allowing 30 working days for them to resolve the matter. Consequently, only valid
Below Tolerable Standard requests are accepted, allowing officers to focus on
working with landlords and private tenants to help address repairs, thus supporting
tenancy sustainment.
206

Page 207

18 
Below Tolerable Standard points will only be awarded where the landlord has failed
to bring the property up to standard. The points will be removed if the landlord
subsequently carries out the repairs.
Points awarded: 200
Accessible Housing Need
If an applicant or a member of their household has a health issue or disability which
is impacting on their ability to carry out day to day living activities in their home, they
can apply for an Accessible Housing Assessment (AHA).
AHAs are carried out by qualified Occupational Therapists (OT) and include:
Grade assessment
There are three grades of priority that can be awarded to an application. These
grades are low, medium and high. An applicant whose housing is deemed to be
satisfactory for their needs will receive no award.
Grade Points awarded
High 400
Medium 200
Low 75 
Where two or more people within a household have accessible housing needs, only
one award of points is made. The award will be for the person with the highest need.
House type recommendation
If a grade is awarded, the occupational therapist will recommend house types that
are suitable for the household’s needs. Applicants who do not wish the type of
accommodation recommended by the occupational therapist will not receive any
award of points.
Reasonable adjustments
We may be able to make reasonable adjustments to housing, through North Ayrshire
Council’s adaptations scheme. This may allow people to remain in their current
home. Cases are assessed and prioritised, and are subject to available resources.
We have several houses that have been adapted or designed for disabled people,
for example, wheelchair accessible housing. We have well-established procedures
for allocating highly adapted properties.
Overcrowding
When assessing overcrowding, we use our occupancy standard (see Section 4.4
Table 2).
We award points for each extra room needed based on our occupancy standard
subject to our overcrowding rules (see Section 4.5). The table below details the
number of points available under this category.
207

Page 208

19 
Additional bedrooms required Points awarded
1 additional bedroom required 50
2 additional bedrooms required 100
3 additional bedrooms required 150
4 additional bedrooms required 200 
Points awarded: 50 (for each extra room required based on our occupancy standard)
Insecurity of accommodation
Applications from people living in insecure accommodation will be awarded points
based on their circumstances. Applicants who are homeless or threatened with
homelessness can apply for housing through the Council’s Homelessness Policy,
which includes advice and assistance.
‘Insecurity of accommodation’ covers a range of situations, including applicants who
live in:
• Private sector accommodation with limited security
This covers private rented sector accommodation that is ending due to actions by the
landlord or agency to seek recovery of possession. For instance, this might apply in
cases where the landlord is terminating either an assured, short-assured or private
residential tenancy through the correct legal procedures.
Insecurity of tenure points may also be awarded to owners whose home is
threatened because of mortgage default. This may happen if owners cannot afford to
maintain mortgage payments and lenders have taken court action to recover the
property for sale. Points are awarded once the owner has a date to leave the
accommodation. In processing applications we will carry out checks, as required, to
confirm details.
Points awarded: 150 
• Tied accommodation 
This applies to applicants living in accommodation as part of their employment
duties. We award points under this category when the occupation is ending due to
termination of employment. Points are awarded 6 months before the person leaves
employment. 
Points awarded: 150 
• Armed Forces 
This applies to Armed Forces personnel and Veterans who wish to be re-housed in
North Ayrshire.
208

Page 209

20 
The Armed Forces Act 2021 places a legal duty (the ‘Covenant Duty’) on social
landlords to consider the armed forces community when exercising certain statutory
functions in housing, including developing and reviewing allocation policies.  
Where applicants are leaving the Armed Forces, additional points will be applied on
receipt of the certificate of discharge. Points will also be awarded for any other
housing needs specified in the allocations policy. 
Applicants who own or have a legal right to occupy other accommodation will not be
awarded these points. 
If an applicant does not receive a suitable offer of housing prior to the date they are
due to leave the Armed Forces, these points will remain in force for a period of 12
months from receipt of the certificate of discharge, provided they have not secured
alternative accommodation which they have a legal right to occupy. 
The rules in this section will also apply to a surviving partner who confirms that they
are required to leave forces accommodation because of a partner’s death. 
If an applicant did not have an application for housing while serving in Armed Forces,
and has now left service, and has not secured accommodation which they have a
legal right to occupy, they may apply retrospectively. This request must be made
within 12 months of the date the applicant left the armed forces. The points will
remain in force for a period of 12 months from receipt of the certificate of discharge
unless the applicant secures alternative accommodation which they have a legal
right to occupy beforehand. 
This demonstrates our partnership commitment to the UK Armed Forces Covenant. 
Points awarded: 150 
• People of no fixed abode 
Applicants of no fixed abode will be awarded a minimum number of points for the
number of bedrooms that they need in line with our occupancy standard (see Section
4.4 Table 2). 
Applicants will also be referred, as appropriate, to North Ayrshire Council’s Housing
Advice Team (HAT). 
Points awarded: 30
Shared Accommodation
Applicants who stay with other people, such as friends or relatives, or who are
lodgers but want their own accommodation, are in this group. It also includes
partners in a relationship breakdown who now want to live separately and children
209

Page 210

21 
who have grown and want to leave the family home. As applicants for housing, they
now form a separate household.
Applicants who sub-let part of their home or take in lodgers do not qualify for these
points.
Points awarded: 20
Shared Amenities
We also award points to applicants who are living with other households if they share
key amenities. The amenities for which points are awarded are kitchen, bathroom or
toilet. Applicants need to only be sharing one of these amenities to qualify for the
points.
Household type Points awarded
Single person and couples 20
Families 30 
Under-occupation
The Housing Allocation Policy adopts a ‘transfer-led’ approach towards releasing
more homes for letting and to enable existing tenants to move into properties better
suited to their current and future housing needs. 
Reducing under-occupation helps us to make for best use of our housing. Tenants
often wish to downsize to a smaller property where they are not using all the
bedrooms in their current property.
Tenants can apply to move to accommodation that reduces present under-
occupation levels even if the house remains under-occupied. Such applicants would
be awarded under-occupation points only where under-occupation is reduced. 
Points awarded: 
50 for one- or two-bedroom properties (for each room under-occupied based on our
occupancy standard)
100 for three-, four-, five- and six-bedroom properties (for each room under-occupied
based on our occupancy standard)
Releasing housing for let to other applicants
Where two separate tenants are partners and wish to live together, and re-housing
both households’ releases both of their houses for let, we award a fixed number of
points.
Points awarded: 50 
Arran Local Letting Initiative
The Arran Local Letting Initiative (LLI) allows certain NAHR applicants to be entitled
to additional points if they live on Arran and/or are deemed to be essential workers.
210

Page 211

22 
The additional award of points will be added to any points already accrued by
applicants, reflecting their current housing needs and circumstances.
The award of points is applied where the applicant meets the appropriate criteria. 
Points awarded: 
100 for residency where the applicant has been living on the island for at least 6
months.
200 for Tier 1 Worker - where the applicant is a public sector employee who provides
an essential service.
100 for Tier 2 Worker - where the applicant has any other employment.
To meet the criteria for additional points for those who are employed on Arran you
must:
• Have a permanent contract or a minimum of a two-year temporary contract; and 
• Have a minimum of 16-hour working week.   
4. Making an offer of housing 
In this section we will focus on explaining how we make an offer of housing. This
section will cover:
• How we make an offer of housing
• What type of tenancy we offer
• What size of property applicants will be considered for
• Explain our Occupancy Standard to determine over and under-occupancy 
• How we use Local Letting Plans to make best use of stock to meet local demand
• How we allocate housing to those individuals/families coming through refugee
resettlement programmes
• How we allocate housing to Gypsy/Travellers
• Outline our approach to harassment
• Explain our process when allocating housing to staff, elected members, etc.
• Explain when and where we will review and remove applications. 
4.1 Offers
We make reasonable offers based on the applicant’s housing needs and
preferences, after confirming details on their application form. This is good practice
as it aims to reduce unsuitable offers and potential refusal of offers.
Before an offer of housing is made, we will take into consideration the applicant’s
individual needs and circumstances, the most effective use of the stock, and any
impact on the wider community. 
Existing Council tenants applying for housing will be subject to a pre-allocation check
and visit at their existing home. Any offer of housing will be subject to approval.
All offers are reviewed by a secondary officer to ensure compliance with the policy. 
211

Page 212

23 
The overall objective is to address housing need in accordance with the policy. This
is consistent with the aims and objectives agreed by the NAHR partners.
Reasonable offers are those that reflect an applicant’s stated choice. NAHR partners
will consider an offer to be reasonable if it meets the preferences stated on the
application, based on the criteria set out in Section 2.8.
Should an applicant refuse an offer of housing, we will contact the applicant to
discuss their preferences and housing options in more detail. The Council aims to
provide relevant housing options advice and information on supply, turnover and
demand to ensure applicants can make informed choices about their preferences. 
4.2 Tenancies
We offer applicants who qualify for housing, a Scottish Secure Tenancy in line with
our legal obligations. In a limited number of situations, we may offer applicants a
Short Scottish Secure Tenancy (SSST). A SSST has limited security of tenure in
comparison to a Scottish Secure Tenancy.
NAHR partners have developed separate policies which explain when a SSST may
be granted. Copies of these policies can be made available upon request.
Examples of when a SSST may be granted are:
• Where an applicant has been evicted for anti-social behaviour within the last 3-
years; or
• Where a tenant (or a family member) is subject to an anti-social behaviour order. 
4.3 House size
This section details the house size for which applicants will be considered. In
addition, it outlines rules to address overcrowding and under-occupation.
Table 1: The size of house for which applicants will be considered 
Number of bedrooms applicants will
be considered for
Household size Bedsit One Two Three Four
Single person X X X  
Couple  X X  
Couple or single adult and one other
person  
X  
Couple or single adult with two children
under 5 years  
X  
Couple or single adult with two persons,
either of whom is aged 5 years or older  
X X 
Couple or single adult with three persons
of whom:
• Three are under 5
• One is aged 5 or older
• Two are aged 5 or older
• Three are aged 5 or older 
X
X
X
X
X
X
212

Page 213

24 
Couple or single adult with four persons of
whom:
• Four are aged under 5
• One is aged 5 or older
• Two are aged 5 or older
• Three are aged 5 or older
• Four are aged 5 or older     
X
X
X
X
X
X
X
X
X
Any larger household     X 
4.4 Occupancy standard for assessing over and under-occupation
When assessing whether overcrowding or under-occupation exists, we use our
occupancy standard (see Table 2). This standard is used to award points to
applicants if they are overcrowding or under-occupying.
The number of bedrooms assessed as being required is based on the household
size.
Table 2: Occupancy Standard
Household Size Bedrooms Required
Single person Bedsit/One
Couple One
Other household members who are
aged 5 years or older
One
Two children aged under 5 years One
Any other person One 
The 1987 Act (Sections 135-137) outline the legal standard for overcrowding. In
assessing if overcrowding exists, the legal standard takes account of the living room
and bedrooms as sleeping accommodation. Applicants whose homes are legally
overcrowded and in which the overcrowding is detrimental to health can be entitled
to apply for housing under the Homelessness Policy.
While the law sets out the minimum standards needed to prevent overcrowding, in
practice, landlords can set more generous standards of their own. The policy
standard excludes the living room when measuring overcrowding and is more
progressive than the legal standard. Our standard states that children should
have separate bedrooms as soon as they reach five years of age, whereas the legal
standard has the age limit set at ten years of age.
In some properties, rooms used as a separate dining room are also suitable for use
as bedroom accommodation. In these cases, the dining room is regarded as a
bedroom.
In specific circumstances, for medical needs and functions, extra room space may
be required. This will be subject to confirmation from a qualified Occupational
Therapist.
213

Page 214

25 
The size of house that we let to parents with shared access is based on the specific
access arrangement and our shared access procedures
4.5 Rules on overcrowding 
We will not let houses to applicants if this creates statutory overcrowding, as this
would not meet our legal obligations. The size of houses that we let to applicants is
based on our policy standard (See Section 4.3 - Table 1). This is to meet applicants’
choice in certain circumstances, for instance, where moving house meets other
needs.
We use our occupancy standard to assess need. Applicants are grouped and receive
points based on their present housing circumstances.
Overcrowding assessments include people who normally live in the house but who
are temporarily absent. This could include family members working away from home
for a short period and students.
Bed-sit accommodation is considered suitable only for single people. Couples living
in bed-sit accommodation would be regarded as being overcrowded.
In the case of households that are living apart in separate houses but want to live
together, overcrowding points are granted based on the main applicant’s address.
Applicants may also choose to move to accommodation that does not reduce
overcrowding. No points for overcrowding will be awarded in such cases.
Demand for larger houses exceeds supply in many areas. This makes it necessary,
on occasion, to consider applicants for smaller houses than specified in our
occupancy standard. This decision is based on the stated preferences of applicants.
4.6 Under-occupation
We use our occupancy standard (see Section 4.4, Table 2) to assess need.
Applicants receive points based on their present circumstances.
We may allow under-occupation of larger accommodation, where required. This may
be necessary if:
• a house is located in an area of low demand and there is no demand from
particular groups on the NAHR; or 
• an applicant can show a need for such accommodation, for example, medical
needs or family needs. 
4.7 Local Letting Plans 
The Council, working with NAHR partners, may devise strategies to address local
letting demand.
These plans set out in detail where and how it is intended to vary the policy at a local
area level to take account of the supply of housing and the needs and demands that
exist locally. 
214

Page 215

26 
All local letting plans are developed in consultation with tenants, NAHR partners and
other community stakeholders. 
The plans clearly state aims and objectives which align with those detailed within the
policy. 
Local letting plans are monitored and reviewed to ensure that the outcomes from the
plans are consistent with the aims of the policy. On an annual basis, the Council will
report on and publish details of performance during the year and revise the letting
targets for the year ahead.
The existence of local letting plans ensure that a more flexible and strategic
approach is taken to the allocation of housing in North Ayrshire communities.
4.8 Refugee Resettlement Programmes
North Ayrshire continues to support several humanitarian resettlement programmes
in relation to the evacuation from Afghanistan, various Ukrainian visa routes,
Unaccompanied Asylum-Seeking Young People and the UK Resettlement Scheme
(UKRS - legacy of the Syrian Resettlement Scheme). 
We have established separate policies that cover the rights of asylum seekers and
immigrants, including the rights of other European Union citizens. These policies
cover access to the NAHR and the rules concerning the allocation of houses to these
groups. 
4.9 Gypsy/Travellers
Applications from Gypsy/Travellers, are placed in the appropriate group based on
their present housing conditions and are awarded points based on their actual
housing conditions. 
Applications from Gypsy/Travellers who have nowhere to pitch their caravan would
be referred to the Council’s Homeless Services.
The Council has one official Gypsy/Traveller site with 16 individual pitches. The site
has a separate allocation policy, which can be made available upon request.
4.10 Harassment
NAHR partners condemn all forms of harassment and will vigorously pursue action
against all perpetrators. NAHR partners are committed to promoting a safe and
secure environment so that residents can live peacefully in their own home and
communities.
Harassment may occur on various grounds for example harassment on grounds
such as age, disability, gender reassignment, race, religion or belief, sex, sexual
orientation, marriage and civil partnership, and pregnancy and maternity. We have
established specific procedures for dealing with this through our Harassment Policy.
The Harassment Policy does not apply in cases of domestic abuse and/or violence,
as these are dealt with under the North Ayrshire Domestic Abuse Policy – All Tenures
and Homelessness Policy.
215

Page 216

27 
In dealing with harassment situations, we assess each case individually and discuss
appropriate remedies with the complainant. This might include applying to the court
to evict or transfer tenants responsible for harassment.
After investigating complaints of harassment, we may consider that it is no longer
reasonable for the applicant to live in their current accommodation. In such cases, a
referral will be made to the Homeless Services.
We adopt a victim-centred approach to addressing harassment and consider
relevant options in discussion with the victim.
4.11 Domestic Abuse and/or Violence
The Domestic Abuse (Scotland) Act 2018 came into force on 1 April 2019. The Act
created a new statutory offence of engaging in a course of behaviour which is
abusive of a partner or ex-partner.
Thereafter, the Domestic Abuse (Protection) (Scotland) Act 2021 came into force on
5 May 2021 and provided new and improved protections, to complement the existing
measures, for victims of domestic abuse. 
The definition of domestic abuse is in two parts. The first part deals with the
relationship between the perpetrator and the victim/survivor; the second part defines
what constitutes abusive behaviour.
‘Abusive behaviour’ can be defined as any of the following:
• Physical or sexual abuse
• Violent or threatening behaviour
• Controlling or coercive behaviour
• Economic abuse
• Psychological, emotional or other abuse.
For the definition to apply, both parties must be aged 16 or over and ‘personally
connected’. ‘Personally connected’ can be defined as parties who:
• Are married to each other
• Are civil partners of each other
• Have agreed to marry one another (whether or not the agreement has been
terminated)
• Have entered into a civil partnership agreement (whether or not the
agreement has been terminated)
• Are or have been in an intimate personal relationship with each other
• Have, or there has been a time when they each have had, a parental
relationship in relation to the same child
• Are relatives.
The law also recognises that domestic abuse can impact a child who sees, hears, or
experiences the effects of the abuse and it treats such children as victims/survivors
of domestic abuse in their own right (where they are related to or under parental
responsibility of either the perpetrator or the victim/survivor). 
216

Page 217

28 
Partners across North Ayrshire recognise the impact domestic abuse has on victims
and their families. As social landlords, we regard domestic abuse as unacceptable
behaviour which will not be tolerated. 
The North Ayrshire Domestic Abuse Policy – All Tenures is aligned to the Chartered
Institute of Housing’s ‘Make a Stand’ campaign. The Council and its partners have
signed a pledge to demonstrate our commitment to this campaign to bring an end to
domestic abuse in all its forms, ensuring our tenants and residents know their rights
and understand how to access services.   
The policy was developed by an inter-agency group comprising of the Council,
NAHR partners and agency partners, and sets out our commitment to anyone in
North Ayrshire who is experiencing or is concerned about another individual affected
by domestic abuse. The policy is for all North Ayrshire residents, irrespective of
tenure or gender, and complements the individual domestic abuse policies of the
partner organisations.
In dealing with domestic abuse and/or violent situations, we assess each case
individually and work with partner agencies to support the victim. 
After investigating reports of domestic abuse and/or violent situations, we may
consider that it is no longer reasonable for the applicant to live in their current
accommodation. In such cases, a referral will be made to the Homeless Services.
We adopt a victim-centred approach to addressing domestic abuse and/or violence
and consider relevant options in discussion with the victim.
4.12 Council employees and Elected Members
Applications from North Ayrshire Council employees and Elected Members are
assessed in accordance with the policy. These applications are dealt with in
accordance with relevant codes of conduct.
Although Elected Members are involved in the approval of the Housing Allocation
Policy and additionally in monitoring and reviewing its impact, they are not,
however, directly involved in decision-making concerning the allocation of
housing.
4.13 NAHR partner employees and committee (or board) members
Applications for housing from NAHR partner employees and committee (or board)
members are assessed in accordance with the Allocations Policy. These applications
are dealt with in accordance with relevant codes of conduct and Entitlements,
Payments and Benefits Policies.
Although board/committee members are involved in the approval of the policy and
additionally monitoring and reviewing its impact, they are not, however, directly
involved in decision-making concerning the allocation of housing. 
217

Page 218

29 
5. Managing housing applications 
5.1 Reviewing housing applications 
It is important that the information held in respect of a housing application accurately
reflects the applicant’s current housing needs and circumstances. NAHR partners will
contact applicants at least once annually to clarify and confirm that the information
held on the application is up to date. The date of review is determined by the date of
registration. This is important to maintain accurate information about applicants so that
appropriate offers are made to reflect their needs and choices, and subsequently
minimise refusals. 
We request applicants to advise us within 10 working days if they wish to remain on
the NAHR. If no response is received, we will issue a reminder giving applicants a
further 10 working days to respond to us. Thereafter, if no response is received, we
will cancel the application and remove it from the NAHR. If an application is cancelled
due to failure to respond to the review, it will only be reinstated where the applicant
can demonstrate an appropriate reason for not responding. 
Applicants who contact us within 6 months of their application being cancelled will
have their original application form reinstated. The date of registration will be based
on their original application. However, applicants may be required to complete a new
application form if circumstances have changed. 
5.2 Change of circumstances and preferences 
As outlined in Section 5.1, NAHR partners will contact applicants annually to review
their application and contact details. However, applicants are responsible for
informing NAHR partners, by contacting their local housing office, of any changes in
circumstances as this may impact on their application. An example of this may be: 
• Where the applicant moves house 
• Where the applicant leaves or joins another household
• Where a member of the household reaches 5 years of age. 
In addition, we also request that applicants ensure their contact details are kept
updated as, if we are unable to contact an applicant, their application may be
cancelled. 
Applicants can change their choices/preferences at any time by contacting their local
housing office. 
5.3 Cancellation of housing applications 
There are times where it is necessary for NAHR partners to cancel applications. This
allows us to maintain an accurate and up-to-date register, as well as ensure fairness
and transparency and regulatory compliance.
The following circumstances are where we would cancel an application from the
NAHR: 
218

Page 219

30 
• Where applicants have requested that it be removed (either in writing or by e-
mail);
• Where the NAHR partner has been notified of the applicant’s death;
• Where applicants have failed to respond to the review of their application; 
• Where applicants have persistently failed to respond to correspondence from
a NAHR partner requesting contact;
• Where an applicant’s housing need has been met, either by the NAHR,
mutual exchange, obtaining a Scottish Secure Tenancy, or via purchase of a
property; or 
• Where the NAHR partner has established that the applicant has no legal right
to a tenancy. 
5.4 Suspension of housing applications 
In certain circumstances it may be appropriate to suspend an application for housing
for a specific period. Where applications have been suspended, applicants will not
be considered for, or receive, an offer of housing during the period of the
suspension. A suspension will not have a detrimental impact on the applicant’s
points. 
There are specific circumstances where it would be necessary to suspend an
application for housing. These are set out clearly within the Suspension Policy.
Where a decision has been taken to suspend an application for housing, the
applicant will be notified in writing, outlining the reason for suspension and the period
that their application will be suspended for. In addition, we will provide advice and
support to enable the applicant to take appropriate action to remove their
suspension. 
6. Monitoring and reviewing our performance 
The policy was developed by consulting tenants, Registered Tenants Organisations,
the North Ayrshire Network (NAN), NAHR partners, other housing providers,
independent advice agencies, Elected Members and staff.
Throughout the development and review of the policy, we have assessed housing
needs and demand across North Ayrshire’s communities. We will regularly review
the performance of the policy to ensure that these needs and demands continue to
be addressed.
6.1 Setting targets
NAHR partners are committed to ensuring that the allocation process is transparent
and accountable. At the beginning of each financial year, we will set and publish
grouped targets for the percentage of allocations intended to offer applicants placed
within each of the housing lists. 
The targets will be set at both a North Ayrshire-wide and local level. The targets will
be informed by local needs and circumstances, as well as housing needs and
demand information summarised within local lettings plans. Local targets will often
219

Page 220

31 
vary from the North Ayrshire target, to reflect differing housing needs across our
communities. 
6.2 Auditing performance
Procedures are in place to allow individual housing allocations to be audited. A
sample of Housing Application Forms and allocations audit checks are carried out
regularly by designated staff within each NAHR partner organisation.
6.3 Monitoring performance
Monitoring of the application of the policy is essential, to ensure that allocation
practices are subject to scrutiny and continuous improvement. To do this we will:
• Monitor monthly progress towards meeting targets set for allocating housing to
each of our needs groups;
• Provide the Council’s Cabinet with progress reports, as well as making
information available to tenants, RTOs, the NAN, NAHR partners, other housing
providers, Elected Members and staff;
• Review the policy annually to ensure it aligns with any relevant changes in
legislation;
• Undertake a thorough review of the policy in its third year of implementation;
• Take an equalities-based approach, ensuring we have representative
engagement from across North Ayrshire’s communities prior to making any
changes to the policy;
• Communicate any changes that we make to the policy to tenants, RTOs, the
NAN, and applicants. 
7. Complaints and appeals 
7.1 Appealing a decision 
Applicants are entitled to appeal decisions in relation to the policy. An example of this
may be where an applicant does not agree that their points have been awarded
correctly. A standardised approach to appeals applies to all NAHR partners.   
There are two stages to the appeals process. These are as follows: 
• Stage One – an appeal must be made in writing to the local housing office and
thereafter reviewed by the area housing manager. 
• Stage Two – should the applicant remain dissatisfied with the outcome of the
Stage One decision; a further written appeal should be submitted for
consideration by a Senior Manager within that organisation. 
7.2 Making a complaint 
NAHR partners aim to provide an excellent service, however there are times when
customers may wish to complain against decisions that we make in relation to their
220

Page 221

32 
housing application. Details of NAHR partner complaints policies and procedures are
available on their websites. 
• North Ayrshire Council – click here for information on how to make a complaint
• Cairn Housing Association – click here for information on how to make a
complaint
• Cunninghame Housing Association – click here for information on how to make
a complaint
• Riverside Scotland – click here for information on how to make a complaint
• Trust Housing Association – click here for information on how to make a
complaint 
If you have any questions in relation to this policy, please contact us by either: calling
North Ayrshire Council’s Housing Service on 01294 310000; or emailing us at
commonhousingregisterteam@north-ayrshire.gov.uk. 
221

Page 222

Appendix 2 - Proposals
Kinship Carers
Kinship care is where a child is unable to live with their birth parent and resides
instead with a relative or other individual with whom they have a pre-existing
relationship (e.g. a sibling, or close family friend), as outlined in the Looked After
Children (Scotland) Regulations 2009. The carer is referred to as a kinship carer. 
The existing policy does not recognise kinship care as a form of housing need. As of
1 July 2025, there were 314 children in kinship care in North Ayrshire. 
It is proposed that applicants with a formal kinship care arrangement which results in
overcrowding can apply for housing for any required additional bedroom(s).
Applicants will receive points where their existing house lacks the necessary
additional bedroom. A protocol has been agreed with North Ayrshire Health and
Social Care Partnership that identifies formal kinship care arrangements to be
allocated points within this category. 
Policy change: NAHR partners propose to award 50 points per bedroom to
housing applicants with a formal kinship care arrangement where there is a
specific housing need identified (i.e., overcrowding) and remove the
requirement to utilise Group 2- Strategic housing needs. 
Foster Carers
NAHR partners propose that foster carers, and those who adopt, can apply for
housing with an additional bedroom compared to their current assessed need, so
that fostering and adoption can occur. They will receive points if their existing house
lacks the necessary additional bedroom. A protocol has been agreed with North
Ayrshire Health and Social Care Partnership that identifies foster carers and those
who adopt who will be allocated points within this category. 
The current policy recognises foster care as a ‘strategic housing need’, and where
an additional specific housing need (i.e. overcrowding) is identified, we award
additional points to allow us to prioritise. 
As of 1 July 2025, there were 134 children in foster care in North Ayrshire. 
NAHR partners propose to continue to recognise foster care, irrespective of tenure
(e.g. owner-occupiers, private lets, etc.), as a strategic housing need where an
additional specific housing need (i.e. overcrowding) is identified. 
Policy change: NAHR partners propose to award 50 points per bedroom (for
each additional room required based on our occupancy standard). 
Adoption 
The current Allocation Policy does not recognise adoption as a strategic housing
need. 
Between 1 April 2023 – 31 March 2025, there were 8 adoptions in North Ayrshire.
222

Page 223

NAHR partners propose to recognise applicants registered to adopt, irrespective of
tenure (e.g. owner-occupiers, private lets, etc.), as a strategic housing need where
an additional specific housing need (i.e. overcrowding) is identified. 
Policy change: NAHR partners propose to award 50 points per bedroom (for
each additional room required based on our occupancy standard). 
Care experienced adults and care experienced young people
The Scottish Government aims for Scotland to be the best place in the world for
children and young people to grow up. Central to this aspiration is the recognition
and promotion of children’s rights. As well as the national legislative and policy
drivers such as the Children and Young People Act (Scotland) 2014, Getting it Right
for Every Child (GIRFEC) and The Promise Scotland, Scotland also has duties to
secure and enact the rights enshrined in the United Nations Convention on the
Rights of the Child (UNCRC). 
A care experienced adult is a young person aged 16-25 years old who has been
'looked after' at some point since they were 14 years old and were in care on or after
their 16th birthday. 
The term ‘care experienced ‘refers to anyone who has been or is currently in care or
from a looked-after background at any stage in their life, no matter how short,
including adopted children who were previously looked-after. 
NAHR partners place the health, welfare and development of children and young
people, at the centre of the planning and delivery of services. This is recognised
within our Housing & HSCP Care Leavers Protocol. 
The Council offers an integrated and co-ordinated service which aims to ensure that
no care leaver will become homeless, on leaving care, residential, foster or kinship
care and will provide the necessary support to ensure a care leaver can achieve
independence and stability within the community.   
The Protocol promotes the principle that care leavers will be provided with the
securest form of tenancy available to them, dependant on support needs and
independent living skills. The Protocol is an inter-agency departmental agreement
between Housing and the HSCP, detailing the joint response to the support and
accommodation needs of care experienced adults and those who are care-
experienced. The protocol is currently under review. 
During the period from 1 April 2023 to 31 March 2025 35 applications were recorded
on NAHR via Throughcare referrals, with 38 applicants housed during this time. 
The current policy prioritises North Ayrshire young people when leaving care (via
Throughcare services). Housing Options advice is offered to young people who have
223

Page 224

been care experienced, through our Senior Housing Officers, who receive specific
training regarding Care Experienced young people. 
Policy action: NAHR partners will continue with their commitment to prioritise
those who are care experienced (both young people and adults) under the new
Allocation Policy.
Under-occupation
Tenants can apply to transfer to new housing that reduces their under-occupancy,
even if the new house remains under-occupied. Such applicants would be awarded
under-occupation points, only when under-occupation is reduced. 
Under the current Allocation Policy, we award 50 under-occupancy points per
bedroom where an applicant is looking to downsize their property. An example of this
would be where an applicant in an existing 2-bed property is looking to downsize to a
1-bedroom property; they will be awarded 50 under-occupancy points. 
Going forward the North Ayrshire Council letting plan, which supports the Policy, will
adopt a transfer-led approach to release more homes for letting and to enable
existing tenants to move into properties better suited to their current and future
housing needs. Reducing under-occupation helps us to make for best use of our
housing stock. Tenants often wish to downsize to a smaller property where they are
not using all the bedrooms in their current property. 
Policy change: NAHR partners propose to continue to award under-occupancy
points. However, to allow us to proactively free-up larger properties we
propose to increase the award from 50 to 100 under-occupancy points per
bedroom for applicants in 3-,4-,5- or 6-bedroom properties. An example of this
would be where an existing applicant in a 4-bedroom property is looking to
downsize to a 2-bedroom property, they would be awarded 200 under-
occupancy points. 
Armed Forces 
The Armed Forces Act 2021 places a legal duty (the ‘Covenant Duty’) on social
landlords to consider the armed forces community when exercising certain statutory
functions in housing, including developing and reviewing allocation policies.   
Where applicants are leaving the Armed Forces, additional points are applied on
receipt of the certificate of discharge. Points are also awarded for any other housing
needs specified in the allocations policy. 
Applicants who own or have a legal right to occupy other accommodation are not
awarded these points. 
If an applicant does not receive a suitable offer of housing prior to the date they are
due to leave the Armed Forces, these points will remain in force for a period of
twelve months from receipt of the certificate of discharge, provided they have not
secured alternative accommodation which they have a legal right to occupy.
224

Page 225

The rules in this section will also apply to a surviving partner who confirms that they
are required to leave forces accommodation because of a partner’s death. 
Where an applicant has not applied for housing while serving in Armed Forces, and
has since left the service, and has not secured accommodation which they have a
legal right to occupy, they may apply retrospectively. This request must be made
within 12 months of the date the applicant left the armed forces. The points will
remain in force for a period of twelve months from receipt of the certificate of
discharge unless the applicant secures alternative accommodation which they have
a legal right to occupy beforehand. 
Between November 2019 and July 2025, 11 applicants have been housed, with 150
‘leaving armed forces’ points. 
Policy action: NAHR partners propose to continue to award 150 points for
those individuals leaving the armed forces 12 months prior to discharge and
up to 12 months following discharge. This demonstrates NAHR partners’
commitment to the UK Armed Forces Covenant. 
Home ownership
Under the current Allocation Policy, we do not take homeownership into
consideration, although the Housing (Scotland) Act 2014 allows for homeownership
to be taken into consideration when assessing an applicant’s priority for social
housing.   
This means that landlords may assess whether an applicant, or someone who will
reside with them, owns or has previously owned heritable property in Scotland, the
wider UK, or abroad. 
Landlords may decide to give a lower priority to applicants who are homeowners.
However, they are not obligated to do so and may choose to allocate housing to
homeowners in certain circumstances. For example, if an applicant is in a property
that does not meet their needs (e.g. accessible housing needs) and/or requires
rehousing, a landlord may still allocate social housing to them. 
Policy action: NAHR partners propose to continue to allocate housing to
homeowners, as we aim to better support applicants as their housing needs
and priorities evolve. 
Accessible Housing Assessments
Accessible housing applications are assessed in line with the policy and additionally
the principles of the Accessible Housing Assessment (AHA). 
225

Page 226

The focus of accessible housing is how you access the essential facilities in your
home and carry out activities of daily living, it considers progressive conditions and if
your home can be adapted. Current and long-term needs are factored into
consideration to prevent repeat assessments and multiple moves of home. All
assessments are carried out by qualified Occupational Therapists (OTs). 
As of 1 July 2025, there were 1,224 applicants with an accessible housing award, of
which 847 received the medium accessible housing award. A review of allocations
from Group 3 identified examples of applicants with the lower accessible housing
award (75 points), with additional points, being prioritised for accessible house types
ahead of those applicants awarded the existing medium accessible housing award
(150 points). 
Policy change: NAHR partners propose to re-weight and increase the existing
‘medium’ accessible housing award from 150 points to 200 points to improve
positions on the NAHR and ensure applicants are appropriately prioritised
ahead of those examples where applicants have the lower accessible housing
award with additional points. 
Arran Local Letting Initiative 
The Arran Local Letting Initiative (LLI), approved by Cabinet on 27 April 2021, allows
certain NAHR applicants to be entitled to additional points if they live on Arran and/or
are employed on Arran. The additional award of points will be added to any points
already accrued by applicants, reflecting their wider current housing needs and
circumstances. 
The additional award of points is added where the applicant meets the following
criteria:
• Residency (100 points) - where the applicant has been living on the island for
at least 6-months.
• Worker Tier 1 (200 points) - where the applicant is a public sector employee
who provides an essential service.
• Worker Tier 2 (100 points) - where the applicant has any other employment. 
To meet the criteria for additional points for those who are employed on Arran they
must:
• Have a permanent contract or a minimum of a two-year temporary contract;
and 
• Have a minimum of 16-hour working week. 
Between April 2021 and 1 July 2025 there were 90 allocations, 38 of which were not
entitled to LLI points (i.e. Group 1 – homeless).  The remaining 52 were awarded LLI
points. This demonstrates that 58% of allocations positively benefited from direct
support through the Arran LLI to access affordable housing. 
226

Page 227

Policy action: The Arran LLI was developed to address unique housing supply
issues identified both within the Council’s Local Housing Strategy (LHS) and
Housing Need and Demand Assessment (HNDA). 
A similar model of the Arran LLI was explored to be replicated for Cumbrae,
but due to analysis of both the LHS and HNDA for Cumbrae it showed that
housing demand was being met on this island, and they didn’t experience the
same issues with key workers accommodation. 
NAHR partners propose to continue with the Arran LLI to support applicants to
access appropriate social housing on the island. 
Domestic Abuse
The Domestic Abuse (Scotland) Act 2018 came into force on 1 April 2019. The Act
created a new statutory offence of engaging in a course of behaviour which is
abusive of a partner or ex-partner. 
Thereafter, the Domestic Abuse (Protection) (Scotland) Act 2021 came into force on
5 May 2021 and provides new and improved protections, to complement the existing
measures, for victims of domestic abuse. 
The Housing (Scotland) Bill introduced a requirement for social landlords to develop
and implement a domestic abuse policy setting out how they will support persons at
risk of homelessness due to domestic abuse. 
NAHR partners are committed to supporting victims of domestic abuse and/or
violence. This is outlined within the North Ayrshire Domestic Abuse Policy – All
Tenures which was approved by Cabinet on 30 November 2021. 
The Council hosts regular Multi Agency Risk Assessment Conferences (MARAC).
This enables representatives from statutory and non-statutory agencies to discuss
and manage the highest risk domestic abuse cases. Where cases are considered by
MARAC and highlighted that housing circumstances could be a risk factor, we
propose that additional points will be applied. 
Between 1 April 2023 – 31 March 2025, there were 453 cases reviewed at MARAC
over the previous 2 years, averaging 19 cases per month. Under the existing policy,
where MARAC partners agree that an individual is at significant risk and rehousing is
necessary, Housing Services offer support through Group 1 – Homeless. 
Policy change: NAHR partners propose to award 300 points for applicants
experiencing domestic abuse where they have been reviewed at MARAC and
assessed as requiring rehousing due the level of risk.
227

Page 228

228

Page 229

,
NORTH AYRSHIRE COUNCIL
30 September 2025
Cabinet 
Title: Proposals for Community Investment Fund (CIF)
Expenditure
Purpose: To determine applications by Locality Partnerships to allocate
CIF funding to proposed projects.
Recommendation: That Cabinet:
a) Reviews the application from the North Coast and
Cumbraes Locality Partnership in line with CIF
criteria; and
b) Approves the CIF application in relation to
Largs Thistle (see Appendix 1).
1. Executive Summary
1.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for
the creation of an innovative fund to enable communities to address the priorities
they have identified through Local Planning Partnerships and within the context
of North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. In June 2021, Cabinet approved
a further £1m top-up for the funding, with a further £2m added in November
2021.
1.2 Locality Partnerships have subsequently continued to work on their local action
plans and refining proposals for expenditure in line with their locally identified
needs. It is a testament to the dedication of the Locality Partnerships and their
community partners that proposals continue to emerge to provide creative
approaches to addressing local challenges.
1.3 This report brings forward proposals which respond to the specific needs of the
local community, and which have been developed based on local circumstances
and opportunities.
2. Background
2.1 Within its budget for 2017-18, North Ayrshire Council provided an allocation for the
creation of an innovative fund to enable communities to address the priorities they
have identified through Locality Planning Partnerships and within the context of
North Ayrshire Community Planning Partnership’s Fair for All Strategy and the
Council’s Community Wealth Building Strategy. A further £3m was added to the
Agenda Item 7
229

Page 230

funding in 2021, to be distributed among localities as follows: 
2.2 It was agreed that the CIF awards would range between £5,000 and
£100,000 for community organisations, as defined in the CIF guidance, in
order to support proposals and projects that connect with: 
• The North Ayrshire Fair for All Strategy, with consideration for how
applications contribute to community support for the cost-of-living
crisis;
• The Community Planning Partnership and locality priorities;
• North Ayrshire Council’s values, priorities, and business objectives; and
• The Community Wealth Building and Environmental Sustainability and
Climate Change Strategies 
And will also: 
• Fulfil a compelling need and not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number
of people possible;
• Exhibit project and/or organisational innovation in their approaches to their
work in their way of addressing community challenges and in their request
to Locality Partnerships and the Council;
• Come from (an) organisation(s) that is financially viable (can provide
financial statements upon requests) and efficiently and effectively
managed. This can include an organisation to be created to deliver
the project;
• Include options or potential for NAC and CPP employee
engagement and volunteering where possible; and
• Include measurable outcomes and can report to NAC on outcomes on a
regular basis.
Locality Value of
CIF from
first funding
allocation
(2017-18)
Expenditure
to date
Value of CIF
from second
funding
allocation
(June 2021)
Value of CIF
from third
funding
allocation
(Nov 2021)
Total balance
available
Irvine £754,000 £958,358 £290,000 £580,000 £665,642
Kilwinning £286,000 £347,190 £120,000 £240,000 £298,810
Three
Towns
£598,000 £1,243,651  £240,000 £480,000 £74,349
Garnock
Valley
£390,000 £521,103.04 £150,000 £300,000 £318,896.96
North Coast £468,000 £763,161 £170,000 £340,000 £216,783
Arran £104,000 £125,079 £30,000 £60,000 £68,921
TOTAL £2,600,000 £3,956,542.04 £1,000,000 £2,000,000 £1,643,475 .96
230

Page 231

2.3  The proposal development and application process has been agreed as
follows: 
• Locality Partnerships should continue to engage with their communities and
stimulate interest in the CIF. Each Locality Partnership will then strategically
access the applications, make links, and look at the funding ‘in the round’.
• If the partnership supports a bid, then the group will be encouraged to submit
a full application form, which they will decide upon before making a proposal
to Cabinet for final approval.
• The proposal will go to the next suitable Cabinet for final approval. 
2.4 The enclosed application at Appendix 1 has been developed by community partners
and North Ayrshire Council officers and is now recommended for approval by
Cabinet. The application is summarised below. 
2.5 The North Coast and Cumbraes Partnership
The allocation and funds committed to date are outlined in the table below. 
The North Coast & Cumbraes Locality Partnership CIF
allocation to date    
£978,000 
Organic Growers of Fairlie  £22,800  
Clearer Minds    £30,200  
Millport Town Hall   £200,000  
Sing Your Song (WKCIL)   £14,892  
Locality Priorities Worker   £35,948  
West Kilbride Technical & Creative Training Programme   £76,605  
Locality Priorities Worker - extension of support   £41,871  
West Kilbride Sports Club  £6,750
Largs Scottish Women’s Institute  £15,393
Locality Priorities Worker - extension of support  £52,000
Parent Network Scotland  £99.393 
Largs Development Trust  £92.685
Clyde Coast and Cumbraes Mens Shed  £47,500 
Friends of Kirktonhall Glen  £25,000 
Balance  £216,783 
2.6 Proposal: Largs Thistle (£63,000) (See Appendix 1) 
2.6.1 Largs Thistle is a football club whose governing documents contain the objective to
make facilities available (at reasonable charge) to other individuals or groups for
sporting, leisure or other sanctioned activities. Their proposal is supported by a wide
range of groups based in Largs including local schools, parent councils, Largs
Development Trust, other sporting clubs and the Community Council. 
231

Page 232

2.6.5 There is strong community backing for this project. The project meets the Locality
Partnership priorities of increasing social inclusion by helping young people access
activities with their peers, and improving mental wellbeing by supporting a sense of
community as well as physical activity. It also helps support the Community Planning
Partnership priorities of Wellbeing, and, through reducing the number of individual
journeys needed, World. 
2.6.6 The partnership agreed to approve funding of up to £63,000, on the condition that any
underspend, either at the point of purchase (if the final cost of the minibus is lower
than the quote provided), or after the three-year period, is returned to the Community
Investment Fund. 
3. Proposals 
3.1 That Cabinet: 
a) Reviews the application from the North Coast and Cumbraes Locality
Partnership in line with CIF criteria; and
b) Approves the CIF application in relation to Largs Thistle (see Appendix 1). 
4. Implications/Socio-economic Duty 
Financial 
4.1 CIF funding is allocated within existing resources. 
Human Resources 
4.2 None. 
Legal 
2.6.2 Largs Thistle are seeking £63,000 funding for the purchase of a new minibus. This
cost would also cover servicing and maintenance costs for three years. The minibus
would be used by all educational establishments at the Largs Community Campus and
Largs Thistle Youth teams. Where availability permits and during school holidays, the
bus will be available for other constituted community groups to book via a booking
system. 
2.6.3 The minibus will directly benefit a wide range of groups across Largs and the
surrounding area.  The bus would be based at the Largs campus and used by schools
for activities, after-school clubs, cultural visits, and intergenerational activities. At
present, pupils often miss opportunities due to reliance on public transport, teachers
having to use their own cars, or costly private hire. At weekends, the bus will support
youth sport, particularly football where travel can be up to 3 hours for some games.
This will remove the heavy burden currently placed on parents and coaches and help
retain young people in activity. 
2.6.4 The proposal fits with the aspiration within the Council Plan in relation to ‘exploration
of models and the development of pilot schemes to increase access to and use of
public/community transport’. 
232

Page 233

4.3 None. 
Equality/Socio-economic 
4.4 The purpose of Locality Planning is to reduce inequalities, increase community
cohesion and advance community empowerment.  Each of the CIF proposals is tested
against that purpose before being presented to Cabinet. 
Climate Change and Carbon 
4.5 Environmental and sustainability along with climate change and carbon reduction
opportunities are considered in relation to each CIF application.  This proposal
supports recycling and re-use principles. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
strategic aims. 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• Exploration of models and the development of pilot schemes to increase access to
and use of public/community transport.
• We will have active, inclusive, and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The applications support the following pillars of community wealth building. 
• Financial Power: Listening to communities and local enterprises to maximise the
impact of financial investment and grow local business, enhance innovation and
empower communities.
• Land and Assets: Maximising the function and ownership of local physical assets for
the benefit of communities and enterprises. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 The proposals support the rights of children and young people through offering better
access to facilities, in particular supporting the right to play and the right to be part of
their community. 
Consumer Duty 
4.10 None. 
5. Consultation
233

Page 234

5.1 The proposals contained within this report have been developed by the Locality
Partnerships, through consultation with local people, including young people. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1: CIF Application Largs Thistle 
234

Page 235

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
The CIF will support proposals and projects that: 
• Connect with:
o The North Ayrshire Fair for All Inequalities Strategy;
o the Community Planning Partnership (CPP) and Locality priorities; and 
o North Ayrshire Council’s (NAC) values, priorities and business objectives.
• Fulfil a compelling need and do not duplicate existing services or facilities.
• Provide long-term, sustainable, positive results for the greatest number of people possible.
• Exhibit project and/or organisational innovation in their approaches to their work in their way of
addressing community challenges and in their request to Locality Partnerships and the Council.
• Come from (an) organisation(s) that is financially viable (can provide financial statements upon
request) and efficiently and effectively managed. This can include an organisation to be created to
deliver the project.
• Include options or potential for NAC and CPP employee engagement and volunteering where
possible; and
• Include measurable outcomes and can report to NAC on outcomes on a regular basis. 
When to apply and how? 
• LPs should continue to engage with their communities and stimulate interest in the CIF.  The
Locality Partnership will then strategically assess the applications, make links and look at the
funding ‘in the round’. 
• If the partnership supports a bid, then the group will be encouraged to submit a full application form
(attached), which they will decide upon before making a proposal to Cabinet for final approval. 
• The finalised proposal will go to the next suitable Cabinet for final approval.
• Forms should be returned to your Locality Officer, by email if possible: 
Louise Riddex
Locality Officer (Kilwinning & North Coast) 
Economy and Communities
Community Development Team
St John's Primary School
Morrison Avenue
Stevenston
KA20 4HH 
Email: lriddex@north-ayrshire.gov.uk
Tel: 01294475913
Mob: 07980964858 
For more information see the guidance form here: http://www.northayrshire.community/wp-
content/uploads/sites/60/2018/06/community-investment-fund-guidance-notes-17-12-17.pdf 
1. Details of your organisation 
235

Page 236

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Name of Organisation 
Largs Thistle Community Football Club 
Postal Address for Correspondence 
Name of Contact Person: Tiffany Irvin 
Position in Organisation: Communities Development Officer 
Telephone Number   
Email Address: Click or tap here to enter text. 
2. Brief description of your organisation 
Please include its legal status, aims and objectives, activities or services provided and how long it
has been in existence. 
The objects of the club is to compete in competitions organised under the auspices of the SFA /
West of Scotland Football League (hereinafter referred to as the WoSFL) and the Scottish Junior
Football Association (hereinafter referred to as the SJFA) and/or the associations under their
jurisdiction in addition to such social and recreational activities as may be deemed desirable by the
Committee. The Club may also be allowed to compete in other matches or competitions subject to
approval from the SFA / WoSFL and or SJFA. b. The Club is committed to encouraging the
highest ethical standards. All individuals involved in the Club should conduct themselves with
integrity, transparency, accountability and in a fair and equitable manner. c. The Club and its
members shall not discriminate on the grounds of age, disability, gender, gender reassignment,
marriage and civil partnership, race, religion or belief or sexual orientation. d. The Club is
committed to the continuation and upkeep of Barrfields Park as a community asset for the benefit
of the residents of the town and local organisations in addition to its use by LTFC for the purpose
of playing football matches and training. The Club will make the facilities available (at reasonable
charge) to any such individuals or groups for sporting, leisure or other sanctioned activities 
This application is supported by 
• Largs Academy – Mr John Doherty and Tony Gilhoolie
• Largs Primary – Kirsty Carson
• Douglas Park Nursey – Lyndsey Gray 
• St Mary’s Primary – 
• West Kilbride Primary 
• The Parent Councils of Largs Primary, Largs academy and St Mary’s Primary, 
• Largs Community Council 
236

Page 237

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• Largs Community Development Trust – all are constituted groups and the LCDT is
registered as a charity with OSCR. 
237

Page 238

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
3. Title and summary of proposal 
Tell us about your idea. Please describe in as much detail as possible, what the funding will be
used for. 
Please include: 
• where it will be held / delivered
• who is your target audience
• who will benefit from it and how
• any partners that are involved. 
This proposal seeks a funding grant to purchase outright a mini-bus to be used by all educational
establishments at the Largs Community Campus and Largs Thistle Youth teams. Where
availability permits, it will be available through an online booking system for use by Largs Colts,
Douglas Park Nursery and other constituted community groups. 
Largs Thistle Youth has identified a need to have access to transportation to help its various youth
teams as they grow and progress. Whilst training mainly occurs within the Barrfields and
Bowencraigs pitches, throughout the year, all teams have fixtures which are across the region.
Currently parents and guardians are required to transport players to venues, which is inefficient,
but also prevents many children participating if a carer is unable to provide transport and remain
available to return them. 
Similarly, all three Parent Councils have identified that there is a gap in participation in extra-
curricular activities due to the lack of suitable transportation to support these. Unlike most High
Schools or Educational Campus’s in North Ayrshire, Largs does not have access to a small
minibus to allow students and groups to take part in out of school activities. Douglas Park Nursery
have not been able to organise any trips out with Largs due to the lack of transportation facilities.
Similarly, local groups, such as SWI, Dementia Friendly Largs and the Largs Naz Group, do not
have readily available access to a suitable transport to ensure members of the community can live
full and active lives. 
This proposal, if accepted, would allow the purchase of a new mini bus, which can be driven by
most adults (subject to specific conditions), and allow wheelchair users to also take part. The
application will include an allowance to support the running costs for up to 3 years, with the
exception of fuel, which would be met by each participating group. 
This proposal will allow members of applicant groups, as well as community or educational
groups, to access events, competitions, or other activities that they otherwise would be unlikely to
be able to participate in. 
If successful, this will not duplicate and existing facilities – all schools and youth football teams
have indicated that participation in events or competitions is limited due to lack of suitable
transportation. (Coach travel or alternative hire options are prohibitively expensive and also often
logistically unsuitable). 
238

Page 239

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
4. What difference will this project make within the locality and to local services and
programmes? 
Please include: 
• The outcomes you aim to achieve
• How you will approach reducing inequality
• How this proposal fits with the Locality Partnership priorities of 
• 1. Improving access to financial services 
• 2. Increasing social inclusion
• 3. Improving mental wellbeing 
• 4. Supporting skills and work opportunities 
Community Football
Supporting Priorities 2, 3 and 4  
Largs Thistle FC has seen incredible growth in its youth development program, expanding from
just 18 players to over 100 in the past year. This rapid progression highlights the increasing
demand for accessible football opportunities in the community. With this expansion travel has
become a greater challenge, particularly as our girls’ teams now compete in the South West
League with fixtures as far as Langholm, and our Under-15s play in the NASA League, traveling to
distant locations like Girvan. For many families, the strain of arranging transport can be a barrier to
participation. By introducing a Minibus, we can ensure that all young players, regardless of their
background, have the opportunity to compete and develop their skills. Additionally, by working
closely with Largs Colts, we can maximise the use of shared facilities benefiting hundreds of
grassroots children. A minibus would not only support our players on match days but also
strengthen our commitment to inclusion, teamwork, and the continued growth of youth football in
Largs. 
Active Schools (Largs Cluster) – General 
Supporting Priorities: 2, 3 and 4 
Access to a local community minibus for Active Schools Largs Cluster would be a transformative
resource, directly addressing a pressing need for accessible, reliable transportation to support
school’s extra-curricular sports programs and participation in the North Ayrshire Sports Academy
(NASA) Young Ambassador (YA) program Fit for Girls program. 
239

Page 240

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Currently, all Largs Academy students are required to travel independently to centralized training
locations, creating logistical and financial barriers that prevent many from participating fully (2).
This dependence on parents’ availability and personal transport limits not only individual students
but also the ability of the Active Schools program to deliver on its goals of inclusivity, skill
development, and equal opportunity in sports (3 & 4).  
For instance, while only Largs Primary currently manages to attend centrally run events like the
sports hall athletics, a community minibus would empower all primary schools in the Largs cluster
to engage in North Ayrshire-wide sports events and competitions (2). This change would foster a
stronger, more united Largs school cluster by enabling equal participation, which is crucial for
developing a sense of community pride and collective achievement in sports.  
Key regional finals, like the North Ayrshire Netball and Football championships, are at risk due to
the current lack of funding and transport options. Without access to a community minibus, Largs
Academy and its surrounding schools face difficulties in attending these competitions, while other
schools with minibus access can continue to participate and benefit from such experiences.
Additionally, this lack of transport affects targeted student groups, who often miss key trips and
activities, or experiences that can be fundamental in supporting their social inclusion, self-esteem,
and overall development (2,3 &4). Other schools can continue these programs seamlessly due to
their access to transportation, underscoring the need for similar resources for Largs.  
Whilst transport options are available, the rising cost of external transport providers threatens this
sustainability. Several events were missed last summer alone due to limited bus availability,
highlighting the critical need for a dedicated Largs community minibus. Having this consistent
transport option would not only eliminate the ongoing funding challenges and scheduling conflicts
but would also allow the Active Schools program to expand, offering more students opportunities
that are not restricted by Largs’ geographic constraints.  
With access to a community minibus, Largs Academy students would experience numerous
benefits, including improved mental and physical health from regular participation in sports and
social activities. Reliable transport would give students consistent access to competitive sports
events, training, and leadership programs like NASA and Young Ambassadors, regardless of
parental availability or financial limitations. By removing these barriers, the school can combat
isolation, enhance students’ sense of belonging, and build stronger, healthier connections within
North Ayrshire’s broader sports and academic community. (2,3 &4) 
Opportunities: 
Athletics 
Entering the Scottish Schools events at the Emirates and Grangemouth Track and Field has
always been a desire. Due to the distance involved and expenditure this opportunity will not
continue without a mini bus. This would provide an extension of our Athletics pathway and allow
our excellent / elite performers an opportunity they would no longer be given. (3,4) 
240

Page 241

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Mountain Biking  
An up-and-coming opportunity in our school is Mountain biking events. In September parents had
to take any school entries to the national event that was a 3-hour drive away. We would like to
grow a culture in the school for Mountain Biking and transporting the pupils as a school team
would be a great addition to our offer. 
Coaching  
Within the curricular time there are three specific coaching groups. A mini bus will open up
opportunities to make placement visits to a number of providers in this sector. Having flexible
transport will allow the groups to help coach in other parts of our cluster - helping primary festivals,
their school clubs and enhance their class time. This would make a big difference to how equitable
our support is to our neighbouring primary schools. (4) 
Sporting inspire and motivate opportunities  
The school is offered numerous free opportunities at various sporting events / activities in
Scotland, but with the cost of bus hire not included, generally these opportunities cannot be
fulfilled. 
For the school to attend the only way to do so would be to charge pupils to attend which would not
be fair or equitable (2) 
Other Opportunities: 
Without wishing to raise hopes within the community, already various groups have put forward
ideas on how a community minibus could be used. Showworks Theatre group have indicated they
would be able to open up opportunities to take older groups to theatre and drama events further
afield that currently is not possible today. The Largs Community Development Trust has engaged
with other local groups (mentioned above), all of whom would greatly welcome access to a low-
cost transport option such as a minibus, but do not have the funds to procure one or regularly hire. 
5. What engagement has taken place in relation to the project? 
Please include the number of people who have been engaged with or consulted as well as the
range of people. 
This proposal was first discussed formally at the Largs Primary Parent Council in 2023 and was
raised by a member of the community at the Largs Community Council in summer 2024. 
This resulted in engagement with all the Parent Council Chairs, as well as each school in the
campus. The response was unanimously in favour of this, should fund be granted. 
241

Page 242

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Further engagement was undertaken with local groups to gauge whether a community minibus
would open up new opportunities, and again the response was overwhelmingly positive. 
Through this engagement, we have identified the following groups that could enhance their
activities, and the work towards the Priorities: 
• Scottish Women’s Institute
• Largs Colts Football team
• Dementia Friendly Largs
• Clyde Coast and Cumbrae Men’s Shed
• Showworks Drama Group
• Largs Church of the Nazarene
• Largs Green Futures
• Ages Concern
• Largs Museum
• Any other Constituted group within Largs 
The proposal has the backing of 5 Community groups, namely the Largs Academy Parent Council,
Largs Primary Parent Council, St Mary’s Primary Parent Council, the Largs Community Council,
West Kilbride Primary and the Largs Community Development Trust. 
Advice has been sought from North Ayrshire Council Transportation Department, and guidance
has been incorporated to the application and will be adopted should the bid be successful. 
242

Page 243

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
6. How will the project be managed? 
Please include: 
• How the finances will be managed 
• Does the proposed project contribute to volunteering or employment opportunities in North
Coast? Please include the number of volunteering opportunities and employment
opportunities
• If there are any staff requirements, please outline your HR plans 
Financing Options 
Capital purchase 
At time of application, the cost of a new Minibus is as follows: 
Citroen Enterprise Flexilite - Manual
L4H2 (140) with Air Con & Sat Nav
Colour: White
17 seat 1 wheelchair
Manual ramp
Manual side step  
£42,995.00 + vat + 1st reg £55 + RFL £165. 
Total cost for purchase: £51,814 including VAT 
Advantage:
• Brand new vehicle for the Community and Campus
• Vehicle will have zero miles and manufacturer warranty
• Maintenance costs will be minimal in the first three years due to newness of vehicle
• Vehicle meets the current and final Euro 6.3 emissions standards
• Vehicle will retain a high residual value after 3 and 5 years, allowing opportunity to
fundraise for new vehicle or keep for longer. 
• Grant value is retained and depreciates annually, ensuring the grant benefit period is not
only at least 5 years but can be carried forward. 
Disadvantage:
• Largs Thistle responsible for all maintenance and safety inspections 
Leasing: 
To lease the same vehicle (for 5 years) would cost as follows:
243

Page 244

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
60 months 25,000 miles, Payments 3+59, £695.00+ VAT per month 
Total cost of lease: £51,708 including VAT. 
Advantage:
• Brand new vehicle
• Maintenance costs included
• MOT and servicing costs included 
Disadvantages:
• After the term, the vehicle is handed back and a new vehicle will need to be funded – in
effect, the Campus and Community will be without a minibus and require fundraising and
apply for grant funding for the full value of a new vehicle. 
• After 5 years, the grant value will be fully depleted 
Used vehicle purchase: 
Enquiries were made to the possibility of purchasing an approved Used vehicle (through a
reputable supplier of such vehicles). 
£32,995+VAT + RFL 
Advantage: 
• Lower capital cost to purchase
• Marginally lower insurance premiums 
Downsides:
• Vehicle already subjected to ‘wear and tear’
• Additional expenditure will be required on maintenance
• Does not meet latest Euro Standards for emissions
• Residual values will be very low at end of 5-year term 
It is considered that outright purchase is the best option in the long term, as this allows a
brand-new vehicle to be procured, whilst providing future value to allow a newer vehicle to
be purchased should funding permit. Whilst a lease appears attractive, it would consume the
full grant amount in 5 years and have nothing left to show for it. 
Currently, used vehicle process for this category of vehicle are relatively strong, and it is the view
that in the long term ‘saving’ c£10k is not best value for money considering that after 5 years, the
244

Page 245

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
vehicle itself would be nearly or over 10 years old, and require increased maintenance, as well as
having minimal residual value. 
Maintenance 
This application has included a request for funds to be set aside to support running costs for up to
the first three years. 
Indicatively these are estimated as follows: 
Insurance –per annum for an ANY
driver policy (over 25) 
£2200
Road Fund License  £168
12-week safety inspections (5 per year)
@ c£60 per check – with any work
being ‘over and above 
£300
Annual servicing –per year (to include
fund to replaced tyres periodically) 
£600
Non wear and tear costs fund  £1000
Fire extinguisher maintenance/ checks
every 6 months
£100
TOTAL £4368 
Largs Academy have pledged £5k per year to cover running costs of the mini bus, this will going to
an account to cover any ongoing operations. 
Largs Thistle, Largs Colts and the Parents Councils would look to fundraise and ensure funds are
put aside each year to support the ongoing operation of the minibus. The additional grant fund
money would allow the operation to get setup and running and time to adjust for Largs thistle, and
other groups and also provide a better insight to the running costs. 
Other sources of funding will be explored to ensure the future operational costs are met, such as
donations for use. Initial conversations have been positive that yearly grant applications for
c£3000 should be feasible, subject to other applications and the fund value. 
It must be highlighted that the mini bus will strictly not be available for ‘Hire or reward’, i.e. there
would be no fee for use, other than maintenance and any damage incurred. This is part of the
Permitting arrangement required, as well as to comply with insurance purposes. 
245

Page 246

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
It is due to this that the request to support operating costs in the early years is requested as the
use of the mini bus will not generate an income. Over time, as outlined, other funding options will
be explored to ensure that the mini bus can continue to operate. 
Procurement and Operation 
• The minibus would be purchased outright from a specialist supplier by Largs Thistle
Community Football Club (LTCFC)
• The LTCFC would have responsibility for the vehicle, including insurance, Road Fund,
maintenance and managing bookings and will be supported by the Largs Community
Council and Parent Councils
• The vehicle would generally be parked in the lit and secure Largs academy Car Park, or at
Vikingar, however ad hoc overnight parking would be permitted where early starts or late
returns were envisaged. 
• The vehicle will be subject to regular and routine maintenance- carried out at Fit Quick
Motors at a community discounted rate.
• By law, safety checks will be undertaken by a local garage every 13 weeks – NAC
Transportation are keen to support with this and this offer will be explored fully to ensure a
consistent and transparent maintenance regime. However we have confirmation that local
garage Fit Quick Motors are willing to undertake this for us at a community discounted rate.
• The vehicle will be offered fully fuelled with condition of use that it is returned fully fuelled –
generally a booking will be expected to last between 8am-6pm, which will allow it to be
returned fuelled. Exceptions can be made by arrangement
• The LTCFC and the Largs Academy will be the Primary keyholders, however a key may be
supplied to trusted persons within the school as required.  
• Mini bus will be operated under a Section 19 permit
• The LTCFC would become members of the Community Transport Association (CTA) to
ensure it keeps up to date with regulatory or legislative changes as well as news and
updates concerning operating a community transport. 
Bookings 
• An online booking system will be made available. This may be through a standalone
website, Largs Thistles Website  or made available through the LCDT website using a
‘plugin’.
• There is no fee for bookings, however for Community groups, a suggestion of a donation
will be made, which can be fulfilled through an online payment system, such as PayPal. 
• This will allow ‘slots’ to be made available. 
• Priority will be given during term time to groups within the Campus. 
• It is anticipated that it will be available to Largs Thistle Groups and other community groups
where available. 
246

Page 247

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• Community bookings will only be to constituted groups from the North Coast area. It will
NOT be made available for personal bookings or for any bookings that do not accord with
the Locality Priorities. 
Driver Management and Training
Being eligible to drive the vehicle proposed is bound by strict rules, and these are by DVSA,
Insurance and the LTCFC. 
DVSA
Vehicle will be operated strictly within the provisions of the following:
• you’re 25 or older
• you’ve had your driving licence for at least 2 years
• you meet the ‘Group 2’ medical standards if you’re over 70 - check with your GP if you’re
not sure you meet the standards
• you’re driving on a voluntary basis, and the minibus is used for social purposes by a non-
commercial body
• the ‘maximum authorised mass’ or MAM of the minibus is not more than 3.5 tonnes – plus
up to 750kg of equipment for disabled passengers, for example a wheelchair ramp
• you’re not towing a trailer 
Insurance
• Only drivers over 25 years old and
• Hold a valid driver’s license and
• Medically fit to drive 
Largs Thistle Community Football Club
• ALL drivers must complete the relevant Minibus Driver Awareness Scheme (MiDAS)
training. This has a small cost and can be delivered by North Ayrshire Council
Transportation. 
• The cost of this training for non-educational use (i.e. Community) is required to be borne by
the group wishing to use the minibus. 
247

Page 248

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
7. Amount of funding being requested 
Please supply details of funding being requested and any other funding you have had over the
past 5 years, both financially and “in kind”. 
Amount of funding requested (£) £63,000 
Please give a breakdown of cost and recent quotations where appropriate. 
Purchase of vehicle as per
specification outlined above 
£51,814
Expected price increase in 2025 £1000
Funding to support up to three years’
operating costs (excluding fuel)
£10,186
TOTAL GRANT REQUEST £63,000   
The LTCFC have not made any request to the North Coast Locality Partnership for funding. 
All Parent Councils actively participate in the Youth Participatory Budget process to raise funds for
various projects within the school. There have been no requests of a similar nature to this
application. 
Quotations are included separately for: 
• Purchase and Lease (see attached email). 
• Insurance quotation (see attached file) 
8. Monitoring and evaluation process 
Please include detail on the monitoring and evaluation processes planned or in place. 
There will be various measures to assess the success and impact of this. 
We will assess the utilisation of the minibus quarterly to ensure it is being used to its best
potential. LTCFC will work with all four schools to set in advance a Use and Share scheme
whereby each school has a notional allocation of ‘days’ they can book (Largs Academy will have a
larger share). We can then work with the schools to proactively ensure they are using their
allocation. This process has already started to encourage Head Teachers to think about activities
not undertaken because of lack of suitable transport (e.g. field trips, competitions, sports events).
248

Page 249

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
Overall, there is unlikely to be significant conflict, as the Football events tend to be at weekends,
however there is already, and will continue to be, close working between the Campus and Football
clubs.  
We will also seek to track how many young people have taken trips using the minibus. Whilst we
do not capture information on YP, we hope each school can provide information on the ages, and
any other Equality indicators to ensure that disadvantaged or other vulnerable groups are
accessing it. 
Furthermore, we will work with each school to further detail the activities the minibus has
supported above what they are able today. We have engaged with Head Teachers, Parent Council
and Active Schools and have identified a range of events and activities (outlined in this paper) that
a minibus will enable that is difficult to participate in today. Reporting will be provided for each of
these to demonstrated that the benefits claimed are being delivered. 
Similarly, we will look to ensure that the minibus is available and used by community groups where
there is availability and will work through the Community Council to encourage this, however it is
expected that the utilisation between the football clubs and campus will be high. 
We will provide an annual report to NAC and the LP on utilisation and outreach and demonstrate
how we are supporting the three Priorities outlined in the application.   
249

Page 250

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP 
Additional Requested information: 
Operational Plan – Community Minibus  
1. Project Operation Overview:
The community minibus will be operated by Largs Thistle and used during term time (Monday
to Friday) by the Largs community campus, comprising St Mary’s Primary, Largs Primary,
Largs Academy. During weekends and school holidays, the vehicle will be made available to
Largs Thistle Groups where available Largs Colts, and other local community groups.
Largs Thistles Committee in particular the Community Development Officer will oversee the
running of the Mini Bus and ensure checks are carried out. 
2. Driver PVG and License Checks:       
All teachers and helpers using the minibus during school time are PVG checked through the
school system.        
• All football-related users—including coaches, secretaries, first aiders, and helpers—are PVG
checked through the Scottish FA, SYFA, and SWF under the grassroots PVG system.
• Each grassroots volunteer has also supplied two references as part of their involvement
requirements. Drivers will upload their driving licence and PVG number when submitting a
booking request. Driving licences will be verified through the DVLA the link will be on the
form to allow the user to share their licence information.
• PVG numbers for football users will be checked via the Comet system using name and date
of birth. As CWPO for Largs Thistle can check these codes using SFA, SWFA and SYFA
comet system as she has full access. 
3. Booking System:
A digital Microsoft Form will be used to request minibus use. This well be available on the
website. This form will include:
• Date and time of use
• Name of the driver
• Upload sections for driver’s licence and PVG number
• Prompt with link to DVLA (https://www.gov.uk/view-driving-licence) to share licence
information.
250

Page 251

COMMUNITY INVESTMENT FUND 
NORTH COAST & CUMBRAES LOCALITY PARTNERSHIP
• Group name and contact details. 
• Once a booking is confirmed, it will be added to a
shared TeamUp calendar (https://www.teamup.com), which allows all admins to view
current and upcoming bookings and ensures there is no overlap in usage. 
4. MOTs and Maintenance:
• The minibus will undergo regular, scheduled MOTs, and all records will be logged and
retained undertaken by Fit Quick Motors at a discounted rate. 
• It will also undergo a 13-weekly safety check at a local garage – Fit Quick Motors who
have already agreed to do this at a community discounted rate. 
• A vehicle checklist will be completed before every use to ensure safety and operational
condition.
• Largs Thistle will also schedule routine maintenance checks in addition to user checks. 
This operational structure ensures that safety, accountability, and community benefit are
prioritised.   
251

Page 252

252

Page 253

NORTH AYRSHIRE COUNCIL 
30 September 2025 
Cabinet 
Title:    Interim Progress Report on the Second Ayrshire Local
Flood Risk Management Plan 
Purpose:  To update Cabinet on the progress and next steps in relation to
the publication of the Interim Progress Report on the Second
Ayrshire Local Flood Risk Management Plan. 
Recommendation:  It is proposed that Cabinet: 
a. notes the progress made by North Ayrshire Council in
implementing the flood risk management measures
contained in the Second Ayrshire Local Flood Risk
Management Plan; and.
b. approves the North Ayrshire Council content for the
Interim Progress Report provided at Appendix 1; and
c. notes that that similar updates are being collated by South
Ayrshire Council, East Ayrshire Council, SEPA and
Scottish Water; and
d. notes that all updates will be included in an Ayrshire
Interim Progress Report on the Second Ayrshire Local
Flood Risk Management Plan which will be published prior
to the required deadline of 31st December 2025 and that
the information will also be added to the interactive
‘webmap’ developed on behalf of the Lead Local Authority
Forum. 
1. Executive Summary 
1.1 The Flood Risk Management (Scotland) Act provides a framework for the assessment
and sustainable management of flood risk throughout Scotland. 
1.2 For flood risk management purposes, the country is divided into 12 Local Plan
Districts, with Ayrshire operating as a single Local Plan District (LPD). 
1.3 North Ayrshire Council as the lead local authority for the Ayrshire LPD, is required to
review and publish by the end of December 2025, an interim progress report on the
actions contained in the current Ayrshire Local Flood Risk Management Plan, which
was approved by Cabinet on 29 November 2022. 
Agenda Item 8
253

Page 254

1.4 North Ayrshire Council is responsible for 34 area-specific flood risk management
measures within its area. The progress made towards implementing the 34 North
Ayrshire Council-led actions is summarised in Appendix 1 of this report. 
1.5 The interim progress report also requires updates to be provided by the other
responsible flood authorities in the Ayrshire LPD on the management measures that
they are responsible for. These are South Ayrshire Council, East Ayrshire Council,
Scottish Water, and SEPA. These authorities are currently finalising a progress review
of their actions and have undertaken to produce these in sufficient time for collation
and publication of the Interim Progress Report. 
1.6 On receipt of the partner updates, an Ayrshire Interim Progress Report will be finalised
in time to meet the December 2025 publication date required by legislation. 
1.7 It is intended that the progress review will be included in a national ‘webmap’ which
will help to increase public awareness and engagement with the Local Flood Risk
Management Plan measures.  
2. Background 
2.1 The Flood Risk Management (Scotland) Act (‘the Act’) provides a framework for the
assessment and sustainable management of flood risk throughout Scotland. 
2.2 For flood risk management purposes, the country is divided into 12 Local Plan
Districts, with Ayrshire operating as a single Local Plan District (LPD). 
2.3 For each LPD, the Scottish Environment Protection Agency (SEPA) is required to
publish a Flood Risk Management Plan (‘the SEPA FRM Plan’) and the lead local
authority is required to publish and report on a Local Flood Risk Management Plan
(‘the Local FRM Plan’).  Both plans contain the same LPD-wide and community
specific measures to manage flood risk but the local plan provides further information
about the timing, funding and coordination of the measures. 
2.4 Designated responsible flood authorities lead on the implementation of the measures
contained in both plans. For the Ayrshire LPD, these authorities are North Ayrshire
Council, South Ayrshire Council, East Ayrshire Council, Scottish Water, and SEPA. 
2.5 The current SEPA FRM Plan was published in 2021 and the Local FRM Plan was
published by North Ayrshire Council as the lead local authority for the Ayrshire LPD, in
2022. The measures in these plans cover the second 6-year long flood risk
management planning cycle 2022-2028 and replace the earlier plans that were
published in 2015 and 2016 from the first flood risk management planning cycle.   
2.6 The Act requires North Ayrshire Council to publish an interim progress report on the
Local Flood Risk Management Plan by the end of December 2025 and to make copies
of the report available for public inspection. 
2.7 A review of North Ayrshire Council’s actions has been completed and is contained in
Appendix 1 of this report. The other responsible authorities (South Ayrshire Council,
East Ayrshire Council, Scottish Water and SEPA) are undertaking a review of their
actions and will submit this information to North Ayrshire Council for inclusion in the
254

Page 255

interim progress report once they have secured the necessary internal approvals to
publish their review details. 
North Ayrshire Progress Review 
2.8 Guidance on the review of flood risk management measures has been issued by the
Lead Local Authority Forum (‘the LLAF’). The LLAF shares good practice, exchanges
information and addresses common issues connected with the development,
publication and reporting of flood risk management plans. Membership includes Lead
Local Authorities, Scottish Water, Scottish Government and SEPA. The LLAF’s
guidance includes further information about the classification of measures into red,
amber and green categories in order to provide a nationally consistent progress
review. 
2.9 There are 34 area-specific flood risk management measures that North Ayrshire
Council are responsible for leading. These are detailed in Appendix 1. Of the 34
measures, 25 are categorised as green as they have progressed or are progressing
as planned,1 measure is categorised as amber as it is still anticipated to be complete
by the end of the current second planning cycle but not as initially programmed, and 8
measures are categorised as red as they are unlikely to be completed by 2028 within
the current planning cycle. All of the ‘red’ actions relate to Flood Protection Scheme
measures and are classed ‘red’ due to uncertainty over funding.     
Flood Protection Schemes 
2.10 The Upper Garnock Valley Flood Protection Scheme and the Millport Coastal Flood
Protection Scheme that were identified in the first flood risk management planning
cycle and carried over into the current cycle are now complete and categorised as
green. The construction of the Mill Burn, Millport Flood Protection Scheme, which was
also identified in the first flood risk management planning cycle is anticipated to start in
2025 and is also categorised as green. 
2.11 Delays in capital funding availability has significantly delayed the implementation of
some of the other flood scheme design actions that were first identified in the second
flood risk management planning cycle. These relate to the development of the North
Ayrshire Council-led Flood Protection Scheme measures at Lamlash, Brodick, Fairlie
and Irvine. 
2.12 A funding review is underway by the Scottish Government and COSLA joint settlement
distribution group. Until this review is complete, funding for all flood scheme measures
identified in the second flood risk management planning cycle throughout the country
cannot be confirmed. Without funding confirmation, further progress on the
implementation of flood scheme measures cannot be made. 
2.13 Overall progress at the mid-point in the current planning cycle is however well
advanced with planned studies at Brodick, Lamlash, Irvine, the ‘Three Towns’, Largs
and the upper Garnock Valley having already been completed or underway that will
inform future measures if funding is confirmed.  A planned surface water management
plan at Kilwinning and a flood study at Whiting Bay (categorised as ‘amber’) are yet to
start but are anticipated to be complete by the end of the current planning cycle in
2028. 
255

Page 256

2.14 There are also LPD wide actions which are not area-specific but cover activities such
as asset maintenance, land use planning, and awareness raising. The review of these
actions is yet to be agreed with the other responsible authorities but are anticipated to
be categorised as ‘green’ to reflect the ongoing nature of these measures. A list of the
LPD-wide actions is included in Appendix 2 of this report. 
Local Coastal Change Adaptation Plans 
2.15 Since the publication of the second Ayrshire Flood Risk Management Plan there has
been an increasing emphasis placed on coastal change adaptation with interim
Scottish Government guidance being published in 2023. In recognition of this interim
guidance and the associated availability of coastal change adaptation funding,
additional measures have been completed to deliver draft Local Coastal Change
Adaptation Plans for Stevenston & Irvine. These plans update the adopted Ayrshire
Shoreline Management Plan, which was published in 2018, and help to deliver the
shoreline management plan updates that were anticipated to start in the third flood risk
management planning cycle, beginning in 2028. 
Publication 
2.16 Once all updates from the relevant responsible flood authorities are made available,
North Ayrshire Council shall be able to finalise and publish the interim progress report
on the Local Flood Risk Management Plan on the flooding pages of the Council’s and
Ayrshire Roads Alliance websites. Advice has been sought on the format of the report
from the Council’s web team to help meet accessibility standards. 
2.17 An interactive Scotland-wide ‘webmap’ has been developed by the LLAF in order to
increase public awareness and engagement with the Local Flood Risk Management
Plan measures. This ‘webmap’ would supplement the interim progress report and
increase public awareness and engagement with the ongoing and planned flood risk
management actions. The Scottish Collaboration of Transport Specialists (SCOTS)
are looking at agreement from the 32 Local Authorities on a lead hosting authority.
NAC information is ready for upload once hosting is agreed and approval to publish
granted. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a. notes the progress made by North Ayrshire Council in implementing the flood risk
management measures contained in the Second Ayrshire Local Flood Risk
Management Plan; and.
b. approves the North Ayrshire Council content for the Interim Progress Report
provided at Appendix 1; and
c. notes that that similar updates are being collated by South Ayrshire Council, East
Ayrshire Council, SEPA and Scottish Water; and
d. notes that all updates will be included in an Ayrshire Interim Progress Report on the
Second Ayrshire Local Flood Risk Management Plan which will be published prior to
the required deadline of 31st December 2025 and that the information will also be
added to the interactive ‘webmap’ developed on behalf of the Lead Local Authority
Forum 
256

Page 257

4. Implications/Socio-economic Duty 
Financial 
4.1 A formal agreement confirms North Ayrshire Council’s, South Ayrshire Council’s, and
East Ayrshire Council’s funding contributions for North Ayrshire Council’s role as the
lead local authority for the Ayrshire Local Plan District. These funding contributions
cover the additional resources required to publish and report on the Interim Progress
Report on the Second Local Flood Risk Management Plan. 
Human Resources 
4.2 None. 
Legal 
4.3 Publishing the Interim Progress Report on the Second Ayrshire Flood Risk
Management Plan by the end of December 2025 will help to meet North Ayrshire
Council’s obligations as Lead Local Authority under the Flood Risk Management
(Scotland) Act 2009 to publish a report on the review of the Second Ayrshire Local
Flood Risk Management Plan. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 Publishing the Interim Progress Report on the Second Ayrshire Local Flood Risk
Management Plan will help to communicate the progress being made towards
implementing the Council’s Environmental Sustainability and Climate Change
Strategy. 
Key Priorities 
4.6 Publishing the Interim Progress Report on the Second Ayrshire Local Flood Risk
Management Plan will help to demonstrate how the key priorities of 'protecting and
enhancing the environment for future generations' and providing ‘sustainable and
effective infrastructure’ are being achieved. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None.
257

Page 258

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The progress review has followed the guidance formulated and agreed by the Lead
Local Authority Forum to ensure that progress is reported in a consistent manner
throughout the country. Local authority flooding teams were consulted for their views
on the guidance prior to finalisation. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Gary Wilson, Senior Manager (Engineering
Services), on 01294 324810 . 
Background Papers
0
258

Page 259

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix 1: Review of North Ayrshire Council’s Community-Specific Flood Risk Management Measures (2022-2028)
Target Area. Action
ID.
Action Type. Original Anticipated
Delivery (2022).
RAG
Status
(2025).
Progress in Delivery,
including key deliverables
and dates.
Revised dates and planned
actions to complete /
address delay.
Irvine 2101 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available. 
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Irvine 2102 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.  
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group. 
259

Page 260

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Irvine 2104 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The outlets in the Waterside
flood embankment are
inspected and cleared when
required every month under
an existing North Ayrshire
Council framework contract. 
N/A
Irvine Coastal 2201 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The Irvine Beach Coastal
Management Study was
completed in 2025. 
N/A
Brodick 2301 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available.
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
260

Page 261

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Brodick 2302 Community
engagement
Community engagement
will be ongoing, linked to
the design of the Brodick
Flood Protection Scheme.
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action. 
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Brodick 2303 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The first phase of the Natural
Flood Management Study for
Brodick was completed in
2025. A second phase will be
considered if there is
sufficient landowner interest. 
N/A
Lamlash 2401 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available. 
Red  As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
261

Page 262

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Lamlash 2402 Community
engagement
Community engagement
will be ongoing, linked to
the design of the Brodick
Flood Protection Scheme.
Red  This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Lamlash 2403 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The first phase of the Natural
Flood Management Study for
Lamlash was completed in
2025. A second phase will be
considered if there is
sufficient landowner interest.
N/A
Lamlash 2404 Flood defence
maintenance 
Flood defence
maintenance   will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Lamlash are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A
262

Page 263

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Whiting Bay 2501 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Amber This study is now
programmed to start and be
complete in the second half
of the current flood risk
management planning cycle. 
Procurement options shall be
investigated to deliver the
study by the end of the
current flood risk
management planning cycle. 
Whiting Bay 2502 Flood defence
maintenance 
Flood defence
maintenance   will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Whiting are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections.
N/A
Dalry 7601 Flood scheme
or works
implementation
The Upper Garnock
Flood Protection Scheme
is under construction,
which will be completed
in the early part of Cycle
2.
Green. Construction of the Upper
Garnock Flood Protection
Scheme was completed in
2023.
N/A
263

Page 264

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Dalry 7602 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green.  The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances.
Community engagement shall
be carried out during the
second half of the flood risk
management planning cycle. 
N/A
Kilwinning
and
Dalgarven
8001 Surface water
management
plan 
This action will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green This work is programmed to
start and be completed in the
second half of the current
flood risk management
planning cycle.
N/A
Kilbirnie and
Glengarnock
9701 Flood scheme
or works
implementation
The Upper Garnock
Flood Protection Scheme
is under construction,
which will be completed
in the early part of Cycle
2.
Green Construction of the Upper
Garnock Flood Protection
Scheme was completed in
2023.
N/A
264

Page 265

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Kilbirnie and
Glengarnock
9702 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances.
Community engagement shall
be carried out during the
second half of the flood risk
management planning cycle. 
N/A
Kilbirnie and
Glengarnock
9703 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances. Using
this information, SEPA will
complete the recalibration of
the flood warning scheme by
the end of the current flood
risk management planning
cycle. 
N/A
Kilbirnie and
Glengarnock
9704 Flood
study (options
appraisal)
This study was completed
before the Local Flood
Risk Management Plan
was published in 2022.
Green.  The study is complete and
the actions have been
promoted on North Ayrshire
Council's website in order to
encourage uptake by
landowners. 
N/A
265

Page 266

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11901 Flood
scheme or
works design
(Mill Burn)
The detailed design of the
Mill Burn Flood Protection
Scheme will be
completed during the first
half of Cycle 2.
Construction is
programmed to begin in
2023/24.
Green The detailed design of the
Mill Burn Flood Protection
Scheme is complete and it is
anticipated that the main
construction contract will be
awarded in 2023.
N/A
Millport 11902 Flood scheme
or works
implementation
(Mill Burn)
This action shall be
delivered during Cycle 2
(2022-2028).
Construction is
programmed to begin in
2023/24.
Green The detailed design of the
Mill Burn Flood Protection
Scheme is complete and it is
anticipated that the main
construction contract will be
awarded in 2023.
N/A
Millport 11903 Community
engagement
(Mill Burn)
Community engagement
will be ongoing, linked to
the design and
implementation of the Mill
Burn Flood Protection
Scheme.
Green A community consultation
was completed in 2025 to
inform the construction
programme for the Mill Burn
Flood Protection Scheme. 
N/A
266

Page 267

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11904 Flood
scheme or
works design
(Millport
Coastal)
The flood scheme design
was completed prior to
the publication of this
Local Flood Risk
Management Plan.
Green The construction of the
Millport Coastal flood scheme
is complete. 
N/A
Millport 11905 Flood scheme
or works
implementation
(Millport
Coastal)
The delivery of the
Millport Coastal Flood
Protection Scheme shall
be completed in Cycle 2
(2022 - 2028).
Construction is
programmed to begin in
2022/23.
Green The construction of the flood
scheme is complete. 
N/A
Millport 11906 Community
engagement
(Millport
Coastal)
Community engagement
will be ongoing
throughout Cycle 2 (2022
- 2028) until the Millport
Flood Protection Scheme
has been implemented.
Green.  The construction of the flood
scheme is complete. 
N/A
267

Page 268

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11907 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Millport are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A
Saltcoats and
Stevenston
12101 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green Hydraulic modelling of the
Stevenston Burn and the
Stanley Burn was completed
by North Ayrshire Council in
2025. An options appraisal
has been commissioned and
will be complete by the end of
the current flood risk
management planning cycle. 
N/A
Saltcoats and
Stevenston
12103 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Saltcoats are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A
268

Page 269

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Largs north 14801 Flood
study (options
appraisal)
This action will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green A preferred option to modify
the formal Largs flood
scheme has been identified.
The future implementation is
being investigated. 
N/A
Largs north 14802 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green The Largs wave overtopping
study is complete and further
community engagement
activities using the study
outputs will be undertaken
during the second half of the
current flood risk
management planning cycle. 
N/A
Largs north 14803 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Largs are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan. The Gogo Water flood
wall is visually inspected
every two years as part of the
programmed inspection of
watercourses. 
N/A
269

Page 270

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Fairlie 15501 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available.
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Fairlie 15502 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.  
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group. 
270

Page 271

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix 2: Area-wide measures for all Responsible Flood Authorities in the Ayrshire
Local Plan District. 
Action type Action Description
Awareness Raising 
SEPA, the responsible authorities and other organisations such as
the Scottish Flood Forum work together through national and local
initiatives to help communities understand the risk of flooding and
what actions individuals can take. Improved awareness of flood risk
and actions that prepare individuals, homes and businesses for
flooding can reduce the overall impact of flooding. Local authorities
undertake additional awareness raising activities when developing
any specific project proposals and will engage with community
resilience groups and local communities. Scottish Flood Forum
support flood risk communities by raising community awareness,
promoting self-help, developing community groups and establish a
recovery support programme after a flood. Scottish Water will
provide targeted flooding communications for Scottish Water
specific activities and raise awareness by producing and supplying
targeted information to the public on large capital projects and
detailed local studies.
Data to support climate
resilience
As Scotland’s hydrometric authority, SEPA operates a network of
stations to measure river level, flow, rainfall, sea level, loch and
groundwater level. The data goes into a long term data archive and
is critical to underpin all flood risk management activities including
flood warning, flood mapping, design of flood protection and
sustainable development as well as supporting a range of
regulatory and recreational uses. SEPA will continue to maintain
and develop its hydrometric network, contribute to UK and
international data archives, and improve and update the datasets
used for flood frequency analysis. SEPA will support research and
development of data, methods and guidance to improve the
evidence on which decisions can be made, and to enable the
impact of climate change to be included in all flood risk
management activities.
271

Page 272

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Emergency plans
Many organisations, including local authorities, the emergency
services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and are
coordinated through regional and local resilience partnerships,
often supported by voluntary organisations. They set out the steps
to be taken to maximise safety and minimise impacts during
flooding. Emergency plans may also be prepared by individuals,
businesses, organisations or communities. Scottish Water is a
Category 2 responder under the Civil Contingencies Act 2004 and
will support regional and local resilience partnerships as required.
Flood forecasting
The Scottish Flood Forecasting Service is a partnership between
SEPA and the Met Office. The service continues to produce a daily,
national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood
risk management duties. In 2022 a new 3-day daily Scottish Flood
Forecast was launched for the public. As the flood warning
authority for Scotland SEPA continues to provide its flood warning
service issuing flood alerts and warnings when required, giving
people a better chance of reducing the impact of flooding on their
home or business.
Flood warning
development
framework
SEPA published a new flood warning development framework in
2022, which details the ambition and strategic actions to maintain
and improve the flood warning service across Scotland. SEPA will
further develop phase 1 of the Scottish Flood Forecast based on
feedback gathered during public beta release before fully launching
the service to the public formally in early 2023. Phase 1 is the
national 3- day flood forecast and the starting point of our journey
in providing the public with earlier and improved flood information.
SEPA will continue to follow the service design approach for phase
2 of the Scottish Flood Forecast, which will provide the public with
more localised flood forecast information. User research will
determine what information will be displayed on the regional flood
forecast webpages. It is anticipated that the final service will bring
together all live information such as flood warnings, river levels and
rainfall data into a central hub that is easily accessible for the
public. Working in close partnership with the Met Office through the
Scottish Flood Forecasting Service, SEPA will develop its capability
in surface water flooding forecasting, focusing initially on the
transport sector to support climate-ready infrastructure. SEPA will
also undertake a prioritised improvement programme of existing
river and coastal flood warning schemes to provide more accurate
forecasting with improved lead time.
272

Page 273

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Future flood risk
management planning 
The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate
and respond to the effects of climate change. How we plan to
manage flooding to our communities is on the front line of the
challenges of this decade. The 2027 flood risk management plans
will be more ambitious than ever before. The plans will look to
develop long term plans for more flood resilient communities
prepared for the impacts of climate change. The priority areas
which will be the focus points of the next flood risk management
plans will be identified in 2024 with the designation of PVAs. A 3-
month public consultation will be held to inform the PVA
designation. We will plan for a better future by publishing our
flooding services strategy in 2023 with a clear and measurable
delivery plan. We will put greener, fairer communities at the heart
of our ambitions. SEPA has set its own target to be a regenerative
organisation by 2030 and the next set of plans will further this
ambition. During this plan cycle, SEPA will work to develop new
partnerships with a wider range of stakeholders, including
businesses and commercial sectors. We will investigate alternative
sources of finance to tackle flooding and drive forward practical
options for adaptation.
Guidance development
The Scottish Government and SEPA will develop and update
guidance to inform flood risk management projects. This guidance
will be produced in 2022 and will look at how best to adapt to the
long-term impacts of climate change and the most appropriate
methods of assessing the benefits of flood risk management
actions. Technical guidance to support flood risk management
partners will be reviewed and updated by SEPA where required.
Scottish Forestry, in collaboration with its UK counterparts,
published ‘Designing and managing forests and woodlands to
reduce flood risk: UK Forestry Standard Practice Guide’ in 2022.
Guidance will be developed to help local authorities understand the
requirements for mapping relevant bodies of water and sustainable
urban drainage systems in their areas.
273

Page 274

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Hazard mapping
updates
An understanding of flooding is essential to develop a plan led risk-
based approach to flood risk management. SEPA will continue to
update their national hazard mapping, which shows the likelihood
of flooding in Scotland from different flooding sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/.
SEPA will continue to develop the hazard mapping viewer to make
it easier for the public, partners and stakeholders to access data on
the likelihood of flooding. SEPA will also review how modelling and
mapping updates are undertaken to develop a more effective
method of regional and national updates for the hazard maps.
Land use planning
Local authorities, SEPA and Scottish Water all have a responsibility
under the Flood Risk Management (Scotland) Act 2009 to support
sustainable flood risk management through the land use planning
process. National planning policies set out the Scottish Ministers’
priorities for the development and use of land. Under this
approach, new development in areas with medium to high
likelihood of flooding should generally be avoided. Current national
planning policies aim to restrict development within the floodplain
and limit exposure of new receptors to flood risk, promote flood
reduction via natural and structural flood management measures
and restoration of natural features, and avoid increased surface
water flooding through sustainable drainage and the minimisation
of impermeable surfaces. Locally determined planning policies may
place further requirements within their area of operation to restrict
inappropriate development and prevent unacceptable risk.
Maintenance 
Local authorities have a duty to assess bodies of water and to
carry out clearance and repair works where such works would
substantially reduce flood risk. Local authorities are also
responsible for the drainage of roads. In addition, local authorities
may also be responsible for maintenance of any existing flood
protection schemes or works. Scottish Water will continue to
undertake risk-based inspection, maintenance and repair on the
public sewer network. Asset owners and riparian landowners are
responsible for the maintenance and management of their own
assets including those which help to reduce flood risk.
274

Page 275

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Natural flood
management mapping 
SEPA will continue to support activities that improve our
understanding of how to effectively target and deliver natural flood
management. As part of this, SEPA will review and update the
opportunities mapping for natural flood management. This will
include linking blue-green infrastructure with the surrounding
natural catchment and coastline. Natural flood management seeks
to store or slow down flood waters through measures such as the
planting of woodlands, wetland creation, river restoration, or the
creation of intertidal habitats. In addition to flooding benefits,
natural flood management measures can also provide many
additional benefits to biodiversity, water quality, recreation, and
carbon storage.
National flood risk
assessment
SEPA will use the most suitable data to review and update the
national flood risk assessment (NFRA) undertaken in 2018. This
update will be used to identify future potentially vulnerable areas
and focus flood risk management planning.
National surface water
mapping
The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding of
surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change.
Reservoirs 
SEPA will continue to develop its assessment of flood risk from
dam failure and use these assessments to direct a proportionate
regulatory approach to ensure reservoir safety. Over the next
management cycle we will implement further developments of our
flood warning capabilities in the unlikely event of reservoir failure.
Scottish Flood
Defence Asset
Database (SFDAD)
The Scottish Flood Defence Asset Database provides information
on existing flood protection schemes. National data on flood
protection infrastructure is needed to understand flood risk and to
develop adaptation planning for Scotland. SEPA will continue to
host SFDAD and look for opportunities to support the development
of our understanding of how and when Scotland’s flood defence
assets should be adapted to continue to maintain protection from
flooding in the future.
275

Page 276

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Self help
Everyone is responsible for protecting themselves and their
property from flooding. People can take steps to reduce damage
and disruption to their homes and businesses should flooding
happen. This includes preparing a flood plan and flood kit, installing
property flood resilience measures, signing up to Floodline,
engaging with their local flood group, and ensuring that properties
and businesses are insured against flood damage. The following
places offer help with taking steps to protect yourself:
https://www.floodre.co.uk/ https://www.biba.org.uk/current-
issues/flood-insurance/ https://floodlinescotland.org.uk/ 
https://scottishfloodforum.org/ 
Responsible authorities and SEPA will continue to develop the
understanding of flood risk to communities and promote measures
to help individuals and businesses to reduce their risk. 
276

Page 277

NORTH AYRSHIRE COUNCIL 
30 September 2025 
Cabinet
Title: Draft Local Coastal Change Adaptation Plans
Purpose: To update Cabinet on the completion of the draft Local Coastal
Change Adaptation Plans for ‘Sandylands Promenade &
Stevenston Beach’ and for ‘Irvine Harbour & Irvine Beach’ and to
seek approval for publication of the plans as the Council’s
preferred policy for coastal change adaptation at the two study
areas.  
Recommendation: That Cabinet:- 
a) notes the work carried out,
b) approves the content of the draft Local Coastal Change
Adaptation Plan for ‘Sandylands Promenade & Stevenston
Beach’ and for ‘Irvine Harbour and Irvine Beach’ and the
accompanying summary reports,
c) agrees to the publication of the draft Local Coastal Change
Adaptation Plans and accessible versions of the draft
summary reports as Council policy documents, 
d) agrees to receive further progress updates on the
implementation of the actions described in the draft Local
Coastal Change Adaptation Plans when appropriate, and 
e) notes the potential future funding requirements of actions
arising from future studies.   
1. Executive Summary 
1.1 The Ayrshire Shoreline Management Plan (‘the Ayrshire SMP’) was approved and
adopted by North Ayrshire Council and South Ayrshire Council in 2018. The Ayrshire
SMP is a large-scale assessment of the risks associated with coastal processes and
the plan helps to inform the management of these risks to people and to the developed,
historic and natural environment. It identifies the preferred shoreline management
policies and actions for 32 coastal policy units over the short (0-20 years), medium (20-
50 years) and long (50-100 years) term. 
1.2 Since the adoption of the Ayrshire SMP, the understanding of predicted coastal change
has improved with the publication of the second edition of the national-scale webmaps
by the Dynamic Coast project. Following the updated webmaps, guidance on the
development of Coastal Change Adaptation Plans was published by the Scottish
Government in February 2023. 
1.3 The local understanding of coastal change has also improved with the completion of
two coastal management studies at Stevenston and at Irvine in 2024. The Stevenston
study was commissioned to build on the community engagement that followed the
designation of Stevenston as a ‘Climate Action Town’ in 2021. The study at Irvine was
Agenda Item 9
277

Page 278

an action arising from the Local Flood Risk Management Plan, which had subsequently
been approved by Cabinet on 24 September 2022. 
1.4 Given the improved national understanding of coastal change and the improved
understanding from the studies completed at Stevenston and Irvine, a funding award of
£99k by the Coastal Change Adaptation Programme to North Ayrshire Council has
been utilised to complete two draft Local Coastal Change Adaptation Plans (‘Local CCA
Plans’) for Stevenston and Irvine. These plans have been completed in accordance
with the 2023 Scottish Government guidance. Copies of the draft Local CCA Plans for
these locations and their accompanying summary reports are included in Appendices A
and B of this report. 
2. Background 
2.1 Between Skelmorlie in North Ayrshire and the Galloway Burn in South Ayrshire, the
Ayrshire Shoreline Management Plan identifies 19 separate policy units, 9 of which
include mainland coastal locations in North Ayrshire. The isle of Arran is covered by a
further 12 policy units while a single policy unit covers the isle of Great Cumbrae.
Smaller islands in the Firth of Clyde are not covered by the Ayrshire SMP. 
2.2 Each policy unit is further subdivided into management zones which recognise different
specific location characteristics or assets. 
2.3 Each of the completed draft Local CCA Plans for Stevenston and Irvine covers two
management zones within the policy units. The first draft Local Coastal Change
Adaptation Plan (Local CCA Plan) covers Sandylands Promenade (management zone
ref. 6c2-B1) and Stevenston Beach (management zone ref. 6c2–B2). The second draft
Local CCA Plan covers Irvine Harbour (management zone ref. 6c2–D1) and Irvine
Beach (management zone ref. 6c2–D2). 
Management Zone Policies 
2.4 In accordance with Scottish Government guidance on Coastal Change Adaptation
(published in February 2023), a short and long-term policy, an action plan, and the
triggers for future decision-making were identified for each of the four management
zones covered by draft CCA Plans (i.e. Sandylands Promenade, Stevenston Beach,
Irvine Harbour and Irvine Beach).   
2.5 The four policies that are available to shoreline managers are defined by national
guidance and are described below: 
• ‘Advance the existing defence line’, which allows new defences to be built on the
seaward side of the original defences;
• ‘Hold the existing defence line’, which allows maintenance and improvement of the
existing standard of protection;
• ‘Managed realignment’, which represents a policy of allowing the shoreline to move
backwards or forwards with management to control or limit movement; and
• ‘No active intervention’, whereby there is no investment in coastal defences or
operations and the shoreline is either allowed to remain in a natural state or to revert to
a natural state. 
2.6 The development of the draft CCA Plans included a scenario testing exercise by
specialist consultants to assess the predicted implications of each of the four possible
policies in order to select a preferred policy for each management zone. The draft
policies were informed by this scenario-testing exercise. 
278

Page 279

Draft Sandylands Promenade and Stevenston Beach Local Coastal Change
Adaptation Plans (CCAP) 
2.7 Between Ardrossan and Stevenston, the earlier Ayrshire SMP identified a single policy
of ‘Holding the existing line’ over the short-, medium- and long-term. However, the
limitations of this broad scale policy are reflected in the developed action plan
contained in the Ayrshire SMP, which promotes the implementation of soft engineering
methods, such as vegetation restoration, to manage erosion locally at Stevenston
Beach. 
2.8 The draft Sandylands Promenade and Stevenston Beach Local CCA Plan has
identified a short- and long-term policy of ‘holding the existing line’ at Sandylands
Promenade and a short- and long-term policy of ‘managed realignment’ at Stevenston
Beach. 
2.9 The draft policies, including the change from ‘holding the existing line’’ to managed
realignment’ at Stevenston Beach remain consistent overall with the action plan
described in the Ayrshire SMP for the Ardrossan to Stevenston shoreline. However, at
a refined management zone level, the change at Stevenston Beach to managed
realignment will address impacts at a local level from erosion arising from, for example,
heightened recreational use. 
2.10 The study area, preferred shoreline management policies and the action plan in the
draft Sandylands Promenade and Stevenston Beach Local CCA Plan is provided in
Appendix D of this report. 
2.11 The coastal change adaptation issues identified by the draft Sandylands Promenade
and Stevenston Beach Local Coastal Change Adaptation Plan are as follows: 
• the required ongoing maintenance of the seawall at Sandylands Promenade;
• the predicted erosion risk to and around the Sandylands Promenade slipway;
• the predicted erosion risk to an area of colliery spoil at Stevenston Beach;  
• the benefits of managing access to reduce the impacts of the recreational use of the
beach; and
• the required continuation of coastal inspections that should be extended to include the
soft shoreline. 
Draft Coastal Adaptation Actions – Sandylands Promenade & Stevenston Beach 
2.12 At Stevenston, both the completed coastal management study and the draft Local CCA
Plan has identified the following early or ongoing coastal change adaptation actions: 
• the continued inspection and maintenance of the seawall at Sandylands Promenade, 
• a wave study to assess erosion pressures around the slipway at the end of Sandylands
promenade and an options appraisal to identify suitable erosion management
measures at the interface of the promenade seawall and the soft shoreline, 
• a site investigation to confirm the composition of the historic colliery spoil that could be
affected by coastal erosion, 
• access management measures to limit the erosion impacts from the recreational use of
Stevenston beach, this includes provision of a preferential path route to the beach area
which reflects stakeholder consultation, and a potential range of other measures such
as signage or fencing directing footfall access; and
• the requirement for the ongoing inspection and maintenance of the soft shoreline. 
Draft Irvine Harbour and Irvine Beach Local Coastal Change Adaptation Plans
279

Page 280

(CCAP) 
2.13 Between Irvine Bay and the Gailes Burn, the earlier Ayrshire SMP identified a single
policy of ‘Holding the existing line’ over the short-, medium- and long-term. However,
the limitations of this broad policy are reflected in the developed action plan contained
in the Ayrshire SMP, which recognises the importance of maintaining and improving the
defences locally at Irvine Harbour but promotes management of the natural dune
system on the beach. 
2.14 The draft Irvine Harbour and Irvine Beach Local CCAP has identified a short- and long-
term policy of ‘holding the existing line’ at Irvine Harbour and a short- and long-term
policy of ‘managed realignment’ at Irvine Beach. 
2.15 The draft policies, including the change from ‘holding the existing line’ to ‘managed
realignment’ at Irvine Beach remain overall consistent with the action plan described in
the Ayrshire SMP for the Irvine Bay to Gailes Burn shoreline. However, at a refined
management zone level, the change at Irvine Beach to managed realignment will
address risks arising from, for example, areas of contaminated soil. 
2.16 The study area, the preferred shoreline management policies and the action plan in the
draft Irvine Harbour and Irvine Beach Local CCA Plan is provided in Appendix E of this
report. 
2.17 The coastal change adaptation issues identified by the draft Irvine Harbour and Irvine
Beach Local Coastal Change Adaptation Plan are as follows: 
• the required ongoing maintenance of the coastal protection structures at Irvine Harbour;
• the predicted erosion risk to an area of suspected contaminated spoil at Irvine Beach;
• the benefits of managing access to reduce the impacts of the recreational use of the
beach; and
• the required continuation of coastal inspections that should be extended to include the
soft shoreline. 
Draft Coastal Adaptation Actions – Irvine Harbour & Irvine Beach 
2.18 At Irvine, both the completed coastal management study and the draft Local CCA Plan
have identified the following early or ongoing coastal adaptation actions: 
• the continued inspection and maintenance of the defences at Irvine Harbour, 
• a site investigation to confirm the composition of the historic industrial spoil that could
be affected by coastal erosion,  
• access management measures to limit the erosion impacts from the recreational use of
Irvine Beach and from the potential impacts associated with the implementation of the
Great Harbour masterplan, this could include similar range of measures to Stevenston
Beach but this requires to be determined by appraisal and subsequent consultation as
required; and. 
• the requirement for the ongoing inspection and maintenance of the soft shoreline. 
Funding 
2.19 North Ayrshire Council and South Ayrshire Council each secured funding of £99k from
the Coastal Change Adaptation Programme in 2024 to bring forward the planned
update of the Ayrshire SMP with a Coastal Change Adaptation Plan that would accord
with the recommendations of the 2023 guidance. The draft Local Coastal Change
Adaptation Plans at ‘Sandylands Promenade and Stevenston Beach’ and at ‘Irvine
280

Page 281

Harbour and Irvine Coast’ mark the start of this process and further work will be jointly
procured by North Ayrshire Council and South Ayrshire Council to extend the coastal
adaptation plan work as this budget allows. 
2.20 Funding of £200k has already been secured from the Coastal Change Adaptation
Programme and up to £50k has been committed by Network rail to help meet the early
actions identified in the draft Local CCA Plans. These actions are as follows: 
• to undertake repair works to the Sandylands slipway and to commission a further study
to help identify how best to adapt to the erosion risk at the east end of Sandylands
Promenade,
• to investigate the suspected contamination at Stevenston beach and at Irvine beach,
and
• to begin improving access to Stevenston Beach by upgrading an existing informal path. 
2.21 The Irvine Harbour defences and part of the Sandylands Promenade seawall are
already regularly inspected by North Ayrshire Council and this arrangement shall
continue to be funded from existing Council revenue budgets. The additional
requirement to inspect and maintain the soft shoreline within Council owned land shall
also be met through existing revenue budgets.   
3. Proposals 
3.1 It is proposed that Cabinet: 
(a) notes the work carried out to date;
(b) approves the draft Local Coastal Change Adaptation Plans and the accompanying
summary reports;
(c) agrees to publish the draft Local Coastal Change Adaptation Plans and accessible
versions of the summary reports as Council policy documents;
(d) agrees to receive further progress updates on the implementation of the draft Local
Coastal Change Adaptation Plans when appropriate; and
(e) notes the potential future funding requirements of actions arising from future studies. 
4. Implications/Socio-economic Duty
Financial
4.1 The development of an Ayrshire-wide Coastal Change Adaptation Plan and a number
of the early actions identified in the draft Local CCA Plans has already secured external
funding as stated in the report. 
4.2 Significant repair or improvement work or the construction of any new coast protection
assets at either Stevenston or Irvine shorelines or any other significant repair or
improvement work to coast protection assets, including soft shorelines, would require
funding to be secured from Council’s general capital budget or central government
funding should it become available for formal coastal protection schemes.   
Human Resources 
4.3 The required inspection, repair and improvement of the soft shoreline would place
additional pressures on the Council’s flooding and structures inspectors. This impact
would be manged by additional training on the inspection of flood assets. 
Legal
281

Page 282

4.4 The draft Coastal Change Adaptation Plans will help the Council, as coast protection
authority, to exercise the powers and duties conferred or imposed by the Coast
Protection Act 1949 and would also help to meet the Council’s landowner
responsibilities. 
Equality/Socio-economic 
4.5 The draft Coastal Change Adaptation Plans rely on the Strategic Environmental
Assessment (SEA) and the Habitats Regulation Assessment (HRA) that were
undertaken to support the development of the Ayrshire Shoreline Management Plan.
Other appropriate assessments will be undertaken as required during the
implementation of the draft action plans to assess the sustainability of the any proposed
measure and to avoid, reduce or minimise any impacts on people and the environment. 
Climate Change and Carbon 
4.6 The draft Local Coastal Change Adaptation Plans help the Council, as landowner, to
adapt to the predicted erosion impacts that are driven by climate change and sea-level
rise. 
Key Priorities 
4.7 The completed Local Coastal Change Adaptation Plans and the implementation of the
actions described in the plans shall contribute to the following key priorities of the
Council, which are to: 
• ensure our places and spaces where we live, work and visit are well maintained and
accessible;
• Improve communities’ preparedness to deal with the impacts of climate change already
locked-in;
• Take a nature-based approach to protect our habitats and species.
• Use dynamic data and lived experiences to inform decision-making. 
Community Wealth Building 
4.8 The procurement of services shall seek to use existing Council framework contracts
that attract community benefits. 
4.9 The maintenance of safe shoreline habitats promotes accessibility and encourages
tourism to enhance local businesses and amenities. 
Islands Communities Impact Assessment (ICIA) 
4.10 None. 
United Nations Rights of the Child (UNCRC) 
4.11 None. 
Consumer Duty 
4.12 None. 
282

Page 283

5. Consultation 
5.1 The draft Coastal Change Adaptation Plans build on and summarise the outcomes of
the completed coastal management studies, which were guided by targeted
consultations in March 2024 and July 2024. A public in-person and online consultation
on beach management at Stevenston and at Irvine was held in September 2024. There
were 18 responses received in response to the public consultation about the
management of Stevenston beach and 24 responses were received in response to the
public consultation about the management of Irvine beach. These consultation
responses helped to inform the actions, for example on improved Stevenston beach
access route.   
5.2 Further consultations will be carried out as part of the development of future adaptation
actions. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Marc Miller, Team Leader (Flooding),
on 01294 317285 
Background Papers
0
283

Page 284

284

Page 285

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 ii 
HASKONINGDHV UK LTD.
2nd Floor One Strawberry Lane
Newcastle
NE1 4BX
United Kingdom
Water & Maritime
VAT registration number: 792428892
Phone: +44 191 2111300
Email: info@uk.rhdhv.com
Website: royalhaskoningdhv.com
Document title: North Ayrshire Coastal Change Adaptation Plan
Subtitle: Stevenston and Irvine Beach Frontages
Reference: PC5329-RHD-XX-XX-RP-X-1001
Your reference Click or tap here to enter text.
Status: Final/1
Date: 4 April 2025
Project name: North Ayrshire CCAP
Project number: PC5329
Author(s): 
Drafted by: 
Checked by: 
Date: 03/04/2025
Approved by: 
Date: 04/04/2025
Classification: Project related 
Unless otherwise agreed with the Client, no part of this document may be reproduced or made public or used for any
purpose other than that for which the document was produced. HaskoningDHV UK Ltd. accepts no responsibility or
liability whatsoever for this document other than towards the Client. 
Please note: this document contains personal data of employees of HaskoningDHV UK Ltd.. Before publication or any
other way of disclosing, this report needs to be anonymized, unless anonymisation of this document is prohibited by
legislation.
285

Page 286

286

Page 287

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 iv 
Table of Contents
1 Approach to development of the North Ayrshire CCAP 1
1.1 Concept and Principles 2
1.1.1 Core Principles 2
1.1.2 Key Objectives 2
1.2 Delivery 2
1.2.1 Stage 1 2
1.2.2 Stage 2 3
1.2.3 Application to the North Ayrshire Coastline. 4
1.3 Communication 4
1.4 Environmental Assessment 4
1.5 Context for division of coastline 5
1.5.1 Ayrshire Shoreline Management Plan 5
1.5.2 Revised approach in developing local CCAPs. 6
1.6 Ongoing Process of Management 8
2 Local Coastal Change Adaptation Plan 6c2.B 9
2.1 General Characterisation 10
2.1.1 Key Issues and Objectives. 13
2.1.2 Previous studies and current policy 13
2.2 Physical Baseline 15
2.2.1 Coastal Form and Geomorphology 15
2.2.2 Tide and water levels 16
2.2.3 Wave Climate 17
2.2.4 Sediment Transport 17
2.2.5 Primary Control Features 18
2.2.6 Coastal Change 19
2.2.7 Flooding 21
2.3 Discussion of Management 23
2.3.1 General 23
2.3.2 6c2.B1 - Sandylands Promenade 25
2.3.2.1 Initial Screening of Coastal Change Adaptation Policies 25
2.3.2.2 Consultation 27
2.3.3 6c2.B2 - Stevenston Beach 28
2.3.3.1 Initial Screening of Coastal Change Adaptation Policies 28
2.3.3.2 Consultation 30
2.4 Summary of Local CCAP 32
2.4.1 Coastal Change Adaptation and Action Plan 33
2.4.1.1 Dynamic Adaptive Pathway 33
2.4.1.2 Action Plan 35
287

Page 288

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 v 
3 Local Coastal Change Management Plan 6c2.D 36
3.1 General Characterisation 37
3.1.1 Key Issues and Objectives 39
3.1.2 Previous studies and current policy 40
3.2 Physical Baseline 42
3.2.1 Coastal Form and Geomorphology 42
3.2.2 Tide and water levels 43
3.2.3 Wave Climate 44
3.2.4 Sediment Transport 45
3.2.5 Primary Control Features 46
3.2.6 Flooding 48
3.3 Discussion of Management 50
3.3.1 General 50
3.3.2 6c2.D1 - Irvine Harbour 52
3.3.2.1 Initial Screening of Coastal Change Adaptation Policies 52
3.3.2.2 Consultation 53
3.3.3 6c2.D2 - Irvine Beach to Gailes Burn 54
3.3.3.1 Initial Screening of Coastal Change Adaptation Policies 54
3.3.3.2 Consultation 56
3.4 Summary of Local CCAP 57
3.4.1 Coastal Change Adaptation and Action Plan 58
3.4.1.1 Dynamic Adaptive Pathway 58
3.4.1.2 Action Plan 60
Table of Tables
Table 1-1: Ayrshire SMP Sub-cell 6c2 Policy 6
Table 1-2: CCAP Management Zones 7
Table 2-1: Water levels (baseline 2024) with change in water levels with sea level rise based on
UKCP18 RCP8.5 95%’ile. 16
Table 2-2: Nearshore wave climate 17
Table 2-3: Policy Assessment - 6c2.B1-Sandylands Promenade 26
Table 2-4: Policy Assessment - 6c2.B2 Stevenston Beach 30
Table 2-5: Summary of high level CCAP policies 32
Table 2-6: Local CCAP Action Plan 35
Table 3-1: Water levels (baseline 2024) with change in water levels with sea level rise based on
UKCP18 RCP8.5 95%’ile. 44
Table 3-2: Irvine wave climate. 44
Table 3-3: Projected rates of sea level rise. 47
Table 3-4: Policy Assessment - 6c2.D1 - Irvine Harbour 53
Table 3-5: Policy Assessment - 6c2.D2 Irvine Beach to Gailes Burn 55
288

Page 289

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 vi 
Table 3-6: Summary of high level CCAP policies 57
Table 3-7: Local CCAP Action Plan 60 
Table of Figures
Figure 1-1: SMP sub-division of the coast. 5
Figure 2-1: CCAP 6c2.B Location Plan. 10
Figure 2-2: SSSI designated area. 11
Figure 2-3: Stevenston Beach LNR. 12
Figure 2-4: Projections of erosion from Dynamic Coast. 15
Figure 2-5: Projections of erosion from Dynamic Coast. 17
Figure 2-6: Longshore wave energy. 18
Figure 2-7: Projections of erosion east (over 20, 50, 80 and 100 years). 20
Figure 2-8: Projections of erosion west (over 20, 50, 80 and 100 years). The inset shows the
projected erosion at the transition). 20
Figure 2-9: Present day direct flood risk. 21
Figure 2-10: Future Flood Risk 22
Figure 2-11: Dynamic Adaptive Pathway 34
Figure 3-1: CCAP 6c2D Location Plan 37
Figure 3-2: Current active use based Strava's Global Heatmap. 38
Figure 3-3: Designated sites. 39
Figure 3-4: General geomorphology covering the wider area. 42
Figure 3-5: Wave Climate. 44
Figure 3-6: Longshore wave energy. 45
Figure 3-7: projected future erosion distances. 47
Figure 3-8: Present day direct flood risk. 48
Figure 3-9: Future Flood Risk 49
Figure 3-10: Dynamic Adaptive Pathway. 59 
Appendices
Provided under separate cover. 
289

Page 290

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 1 
Preface
North Ayrshire Council (NAC) has appointed Royal HaskoningDHV (RHDHV) to assist in developing their
approach to Coastal Change Adaptation Plans (CCAP) for the North Ayrshire coastline. 
The North Ayrshire coastline is approximately 150km in length, including around 50km associated with the
mainland and a further 100km of shoreline associated with the two main islands of Great Cumbrae and
Arran. While the shoreline comprises long lengths of natural cliffs and dunes there are also significant
lengths protected by manmade defences to important towns such as Skelmorlie, Largs, Fairlie, Ardrossan,
Saltcoats, Stevenston and Irvine on the mainland and Millport, Brodick, Lamlash and Whiting Bay on the
islands. In addition, there are numerous smaller villages, ports and harbours, together with important
transport routes, all set within an area of important natural landscape and significant ecological value. 
The coastline, therefore, presents a complex challenge for coastal and shoreline management that must
take account of the significant detailed local needs alongside the need to consider important interactions
across a much broader area. 
North Ayrshire Council wish to ensure that in developing their CCAP, that the CCAP covering any specific
area captures both this local complexity of issues alongside understanding how critical areas interact.   
At present the North Ayrshire coastline is covered by the Ayrshire Shoreline Management Plan (SMP),
developed in 2018. The SMP sets out policy for coastal risk management over the North & South Ayrshire
coastline. In addition to this there have been significant studies undertaken of specific local areas. The
approach taken to the development of the CCAP aims to build upon the work already undertaken,
maintain continuity in management, and consolidate previous information, in line with the recent guidance
from Scottish Government (2023) on the development of CCAPs. 
The overall approach is described in more detail in Section 1 of this Report but in essence aims to develop
local area CCAPs, drawing on existing information but including more recent local studies, building this
together in a consistent manner to create a CCAP over the whole coastline. 
Within the context of the overall approach, this report focusses on two specific areas, where detailed
studies have been undertaken: 
• Saltcoats to Stevenston Point
• Irvine Harbour to Gailes 
The opportunity has been taken to slightly broaden the geographic scope beyond the immediate areas of
study to provide further context for management; but still building this on the initial sub-division of the
coast presented in the SMP, as discussed in Section 1. 
In this way the local detailed studies have formed the basis of the local CCAPs developed for each area,
ensuing that the local CCAPs still capture the necessary broader understanding of coastal issues. It is
intended that an overall CCAP will be developed by NAC, in discussion with key stakeholders, to cover the
full North Ayrshire coastline. The initial local CCAPs (Section 2 and 3 of this report) are effectively
produced as stand-alone documents, set out in a format that can be adopted for the wider area. 
Specific Studies
The initial scope of the two specific study areas included: 
290

Page 291

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 2 
1. The identification of suitable and implementable soft engineering methods to manage coastal
erosion at Stevenston Beach; in line with the adopted Ayrshire SMP.
2. A Natural Flood Risk Management study to identify suitable and implementable erosion
management for the dune system at Irvine Beach, in line with the adopted Ayrshire Shoreline
Management Plan (SMP). 
3. The identification and outline design of suitable measures to improve, manage and safeguard
beach access, given the deterioration of an existing footbridge over the Stevenston Burn.
4. The identification and outline design of suitable measures to improve, manage and safeguard
beach access at Irvine Beach, given the anticipated pressures on Irvine Beach from the effects of
North Ayrshire Council’s Great Harbour Masterplan. 
The initial scoping studies were then developed further into Outline Option Appraisal reports for the two
areas which identified and prioritised options considered under item 1 and 3 above. 
The scoping reports were informed by site walkovers, outputs from the Scottish Government’s Dynamic
Coast Project, the existing and predicted physical constraints of the site and working group and public
consultations. In line with the recent national guidance on Coastal Change Adaptation Plans (CCAPs),
further consideration was given to the natural evolution of the coast, examining the potential timescales of
change. This refined the work taken of the Dynamic Coast Project, which was updated based on detailed
Lidar survey data (Phase 1 - 2010 and Phase 6 – 2022). As well as coastal change predictions over the
wider study areas, the reports specifically look at the influence of existing defences, address concerns
raised during consultations and consider potential changes outside of the study areas. 
The reports go on to consider options for management within each of the Zones identified in the scoping
reports, considering aspects such as management of footfall and access to the beaches, alongside the
uncertainty associated with the potential need for ongoing management of areas of spoil which exist in
both study areas. This approach to management is informed by a refined assessment of future change.
The reports conclude with a summary and consideration of factors affecting decision pathways in the
future. 
The reports are reproduced under separate cover as Appendix 2A and Appendix 3A in support of the
higher level CCAP assessment provided within Sections 2 (Steveston Beach) and 3 (Irvine Beach)
respectively, with information being summarised within each section of this report. 
291

Page 292

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 1 
1 Approach to development of the North Ayrshire CCAP
Scottish Government produced interim guidance (SG2023) for development of Coastal Change
Adaptation Plans (CCAP) in February 2023. In providing this guidance it had been recognised that
different areas of the Scottish Coastline exhibit very different challenges and that different local authorities
have different levels of understanding of their issues. 
The guidance, therefore, does not prescribe exactly how local authorities should develop their CCAPs.
Instead, it intends to provide guidance as to what they should seek to achieve and how it might be
delivered. Indeed, to a degree, the guidance aims to allow and encourage individual authorities to explore
how best, in their areas, the CCAPs should be taken forward. The Scottish Government will seek
feedback from local authorities on the guidance and aims to monitor its efficacy in securing sustainable
outcomes in respect of coastal management. The intention is that the guidance will be revised, reviewed,
and refined based on user feedback and as the evidence evolves. 
The guidance specifically notes:
• “Coastal processes do not conform to administrative boundaries and neither do many
infrastructure assets and communities. It is essential therefore that CCAPs are progressed in a
way that reflects coastal processes systems and not administrative boundaries.” Furthermore,
that, “one size does not fit all, and this guidance recognises the need to maintain flexibility for
appropriate local and regional CCAP delivery structures to emerge.” 
Notwithstanding this element of exploration, the guidance provides a strong framework within which local
authorities are expected to operate. 
The SG2023 does, however, note that several Shoreline Management Plans have already been published
in Scotland over the last 20 years. The majority of these follow the Shoreline Management Plan Guidance
produced for England and Wales (DEFRA, 2006) and therefore, much of the groundwork for CCAPs has
already been done in these areas. 
This is the case for North Ayrshire. As such the opportunity is being taken, through the development of the
North Ayrshire CCAP, to review, provide greater clarity and in some areas revise the SMP. This
recognises that in several areas, covered by the SMP, more local detailed studies have been undertaken
and that there is the need to capture this new information. 
As discussed later in Section 1.5, as far as possible, the structure and way in which the coast has been
divided and described within the SMP has been maintained. This aims to provide a degree of continuity
between the SMP and the CCAP. 
As part of developing the CCAP, there is the need to consider the specific nature of the North Ayrshire
coastline, covering a length of some 150km of shoreline, including areas of the mainland alongside the
principal islands of Great Cumbrae and Arran. Within this length of coast, there is large variation in the
coastal character. In some areas such as the major towns there are significant lengths of man-made
protection. In many other areas there are small settlements alongside many small ports and local
harbours, all set within broader areas of natural shoreline. 
There is, therefore, a clear need to adapt the level of detail provided by the CCAP to reflect the local
nature of the coastline in any location and to maintain relevance to future management of specific areas.
Given the initial background and structure provided by the SMP in identifying the broader
292

Page 293

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 2 
interdependencies throughout the area, this provides the opportunity to focus in more detail on individual
areas. 
To this end, the approach being taken to the development of the CCAP process is to develop a series of
local CCAPs. It is recognised that this process will be ongoing but it does also allow focus on areas where
further information and study has been carried out. The intent is to develop these local CCAPs in a
consistent format around the whole coastline, ultimately allowing collation of these local CCAPs as one
CCAP for North Ayrshire. 
The local CCAPs are developed based on the underlying concept and principles set out in the SG2023. 
1.1 Concept and Principles
1.1.1 Core Principles
The overall the aims of the CCAP are:
• to create a vision for well-adapted and resilient management, properly integrated into other
policies by taking a more land use planning approach, avoiding locking-in future generations to
unsustainable actions, considering that sea levels are expected to continue to rise well beyond the
end of this century;
• to seek opportunities to support and regenerate communities and address inequalities. In
particular, policy should anticipate that changes to property protection and property values will
increasingly come into focus as adaptation pathways are developed; and
• to deliver multiple benefits (for example economic, environmental or amenity enhancements), and
to promote sustainable infrastructure and work to preserve natural features and ecosystems.
1.1.2 Key Objectives
In line with the core principles the following overall objectives of the CCAP are: 
• To promote the resilience of our natural coastline and begin the process of adaptation to climate
change;
• To set out a process for a proactive approach to coastal adaptation planning that will maximise
opportunities and minimise risk from climate change impacts;
• To ensure our collective coastal adaptation journey starts now; and
• To support local authorities to begin the process.
1.2 Delivery
The SG2023 suggests that the CCAP development process might typically be undertake in two stages.
This suggested process, as described in the SG2023, is set out below. 
1.2.1 Stage 1
CCAPs are expected to provide within Stage 1:
• A solid understanding of the overall coastal processes, looking both at the more immediate
aspects of risk of coastal erosion and associated flooding as well as looking longer term at the
potential risks and pressures that may occur or develop. 
• An initial assessment of policies for management of risk, defining these in term of three headline
policies:
o Hold the Existing Line (HTEL)
o Managed Realignment (MR)
293

Page 294

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 3 
o No Active intervention (NAI) 
The guidance suggests that Stage 1 should broadly follow the process provided by the Defra 2006
Guidance for Shoreline Management Plans. However, SG2023 emphasises key modifications to Defra
2006, both in attitude and practice. In relation to this, the SG2023 specifically notes that: 
• “The traditional approach to shoreline management planning whereby a draft plan is produced
and put out for consultation at a relatively late stage in the process, is not appropriate for the
conversations that we need to have about future coastal change. The most sustainable solutions
come from involving many perspectives and insights at an early stage.”
• “Whilst artificial structures will continue to play a valuable role in the protection of people, property
and assets at the shoreline, there needs to be acceptance of their limitations under the current
sea level rise projections. Within future coastal change adaptation planning there should be a
general presumption against installing new artificial structures. Consideration should be given to
the wisdom of maintaining existing structures especially when they reach the end of their design
life.”
• Taking a place-based approach involves dealing with complexity and considering all the physical,
social, and economic elements of a place collectively. Working in a place-based way can identify
key relationships and solve problems that cannot be solved incrementally or by one person or
organisation acting alone.” “….the different arrangements for coastal management in
Scotland…allows local authorities to widen the scope of strategic planning beyond the ‘shoreline’
to include the coastal hinterland and allow planning space for relocation adaptation.”
• “Whereas Defra’s SMP guidance for England and Wales requires working with defined periods of
short term (up to 20 years), medium term (20 to 50 years) and long term (50 to 100 years), for
Scotland the preferred policies should be assigned only to the short term (present) and the long
term (where we want to be before the end of the appraisal period).” 
Stage 1, therefore, aims to define “where we are now” and, from this, taking a longer term broader
perspective, identifying “what are the challenges and where there is need or opportunity for change”.
1.2.2 Stage 2
Stage 2 aims to translate high level policy choices, made during Stage 1, into deliverable Adaptation
Plans. The Scottish Government wants to ensure adaptation actions are forecast and planned for in good
time. Stage 1 identifies where there is the opportunity or need for change, whether this is with respect to:
• on-going coastal change as a result of policies of NAI or MR
• areas where there is change in policy intent (i.e. moving from HTEL or MR to MR or NAI)
• or indeed where there are opportunities to change (modify) the approach taken to HTEL, allowing
a more sustainable approach to sustaining protection. 
Stage 2 considers how such change might be achieved and managed. This starts from identifying what
and when actions need to be put in place. This has to consider what is driving the need for change
“Change Points” or “Physical Triggers,” basically setting the anticipated timescale for change. Alongside
this, consideration has to be given to what actions need to have been put in place to allow change to
occur or where further information may be required to allow future decisions to be made. 
Dynamic Adaptation Pathways – the delivery plan.
The CCAP (based on the Dynamic Adaptation Pathway) should be framed by the physical triggers but
must be flexible enough to allow modification to the pathway to allow adaptation to occur, taking account
of new information emerging over time. Such new information may allow more time for adaptation but may
also indicate the need to accelerate the rate of adaptive change.
294

Page 295

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 4 
1.2.3 Application to the North Ayrshire Coastline.
As noted earlier, some detailed local studies have already been undertaken in North Ayrshire. In effect
already having delivered both stages recommended by the guidance (i.e. building from the initial
assessment provided by the SMP and developing this through to a more detailed plan for ongoing
management). 
In developing specific local area CCAPs, the aim would be to capture this new information and as
necessary, reassess the conclusions of any study against the principles set out in the guidance. Essential
to this approach is the need to recognise that coastal management is an ongoing process. The
development of the local CCAPs provides the opportunity to review current management practice, while
still maintaining a continuity of management, particularly in relation to discussion with stakeholders. 
In essence, under this local CCAP approach:
• Where there are already more detailed studies and management plans in place, these will be
reviewed, with the local CCAP being developed retrospectively but ensuring compliance with the
principles and objectives set out in SG2023.
• Where further studies and management plans are being developed, these studies would include
consideration of the wider longer-term issues highlighted by the SG2023 guidance and associated
with each study a local CCAP would be developed.
• In other areas, initially, policy for management would be defined by the current SMP, with the
intent to develop a basic level local CCAP eventually replacing the guidance currently provided by
the SMP. 
This current report sets out a framework within which this process will be developed, with local CCAPs
being developed for the two areas of Steveston and Irvine Beach and Harbour. The structure and format
for the local CCAPs is as set out in Sections 2 and 3 of this report for these two specific areas.
1.3 Communication
Throughout this process, as emphasised by the CCAP guidance there needs to be a focus on good
communication and engagement as a central pillar of the CCAP process. As set out in the guidance: 
• “CCAPs are not something that should be done ‘to’ communities, rather they should be
developed, reviewed, communicated, and updated in a long-term partnership between
practitioners, residents, and businesses.”
• “The conversations that CCAPs will generate will get more difficult as sea level rises, yet
communication charged by emotion often leads to misunderstanding and distrust. Communities
need planning bodies and regulators to provide clear signals and long-term messaging on sea
level rise and coastal change. Therefore, it is important to develop a communications and
engagement plan early in the CCAP process and that it remains an integral part of the CCAP. 
This reinforces the shift towards long term planning and management which is engendered by the
process, reinforcing the concept of a dynamic approach to development and maintenance of the Plan both
as challenges become more evident and as new information emerges.
1.4 Environmental Assessment
Integral to the development of the SMP was the development of a Strategic Environmental Assessment
(SEA) and Habitats Regulations Assessment (HRA). It is considered appropriate to carry these important
assessments forward, in particular in ensuring that issues identified by the SEA & HRA are incorporated
295

Page 296

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 5 
into the general development of local studies. As part of developing the local CCAPs, the SEA and HRA
have been reviewed and where appropriate additional information on the broader scale environment is
considered. 
1.5 Context for division of coastline
Essential to the approach in developing local CCAPs is ensuring that for each area there is the correct
balance between capturing relevant local detail while equally ensuring that the larger interactions across
the shoreline are recognised. This is discussed below.
1.5.1 Ayrshire Shoreline Management Plan
The administrative boundaries of the Ayrshire Shoreline Management Plan (SMP) (RPS, 2018) extend
from the northern boundary of the North Ayrshire Council area to the southern boundary of the South
Ayrshire Council area. This is approximately from the town of Skelmorlie to the outlet of the Galloway Burn
on the north-eastern edge of Loch Ryan. The islands of Great Cumbrae and Arran are also included within
the scope of the Ayrshire SMP, whilst other smaller offshore islands are excluded due to the low number
of assets present. 
In order to facilitate the development and presentation of appropriate shoreline management policies for
the Ayrshire coastline it was considered essential to sub-divide the full extent of the Ayrshire coastline into
a larger number of smaller geographic sections. 
The North Ayrshire frontage was subdivided into nine coastal sub-
cells relating to sediment supply and transport; 6b1, 6b2, 6c1, 6c2
(located on the mainland), A1, A2, A3 and A4 (covering the island
of Arran) and a singular sub-cell for the island of Great Cumbrae as
shown in Figure 1.1. 
The Ayrshire SMP provides sustainable shoreline management
policies for the Ayrshire frontage across three epochs. Namely;   
• Short term (0 to 20 years)
• Medium term (20-50 years) 
• Long term (50-100 years). 
Four high level Shoreline Management Policies are available to
shoreline managers: 
• Advance the existing defence line.
• Hold the existing defence line.
• Managed realignment
• No active intervention
Figure 1-1: SMP sub-division of the coast. 
The SMP in developing policy further sub-divided the shoreline into Policy Units. In relation to coastal sub-
cell 6c2 the sub-cell is divided into four policy units: 
• 6c2.1 Ardrossan to Stevenston
• 6c2.2 Stevenston to Irvine Bay
296

Page 297

297

Page 298

298

Page 299

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 8 
Table 1-2 briefly sets out the rational for these sub-divisions and highlights the two areas where Local
CCAPs have been developed as discussed in Section 2 (Stevenston Promenade and Beach) and Section
3 (Irvine Harbour to Gailes Burn). 
1.6 Ongoing Process of Management
The two Local CCAPs are developed from the background of the two Coastal Management Studies
recently undertaken (provided under separate cover as Appendix 2A and 3A). These studies focussed on
Policy Unit 6c2.B2 (Stevenston Beach) and Policy Unit 6c2.D2 (Irvine Beach). 
In developing the two Local CCAPs in a coherent manner, consideration has also been given to Policy
Unit 6c2.B1 (Sandylands Promenade) and Policy Unit 6c2. (Irvine Harbour). While there is less detail
available on these associated areas, a similar CCAP assessment process has been able to be carried out. 
The intent of the current report is to set out a framework within which Local CCAPs may be prioritised and
developed for other area of the North Ayrshire coast, in discussion with stakeholders. 
299

Page 300

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 9 
2 Local Coastal Change Adaptation Plan 6c2.B
Sandylands Promenade and Stevenston Beach
The development of the Local CCAP is set out with an initial discussion and description of the larger
CCAP area and subsequent discussion of management of the two specific policy unit areas. The final
section brings this together in summarising the intent of the Local CCAP. 
Overall Plan area: 
• General Characterisation: 
o Description, 
o Identification of key features, issues and objectives,
o Previous studies and current management policy.
• Physical Baseline:
o Geomorphology, 
o Tide and water levels and sea level rise,
o Wave climate,
o Sediment transport and control features,
o Coastal change and flood risk. 
Discussion of Management:
• General discussion over the wider area,
• Local Area (CCAP Policy Unit) assessment;
o Initial Screening of Policy Options,
o Consultation. 
Summary of Overall Plan
• Overall intent of management,
• Policy Summary,
• Coastal Change Adaptation and Action Plan;
o Dynamic Adaptative Pathway,
o Action Plan. 
A detailed study (Stevenston Beach Coastal Study – RHDHV 2025) of the Stevenston Beach has recently
been undertaken, providing more local detail and making specific recommendations for management. This
Local CCAP 6c2.B draws strongly on this study, aiming the capture the higher level issues, providing the
more strategic context in line with the SG2023 guidance. 
This report is provided (under separate cover) as Appendix 2A to this CCAP assessment. 
300

Page 301

301

Page 302

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 11 
Between Stevenston Burn and the Sandylands Promenade, the dunes are punctuated with an area of coal
mining spoil from the historic Auchenharvie Colliery No. 5 pit. With progressive erosion of the dune, the
spoil heap has become increasingly exposed at the dune face and now forms a slight headland holding
this western section of dunes forward of the natural alignment of the shoreline to the east. 
There has also been significant ongoing change in the area of the Stevenston Burn with general erosion of
the dune spit to the west of the Burn and substantial change of the alignment of the Burn over the
foreshore, impacting on the behaviour of the shoreline to the east. 
Social and Built Environment
The most obviously significant infrastructure directly associated with the coast area is the regionally
important railway line, this provides a critical part of the public transport network, linking through to
Ardrossan and Largs and the ferry links to Great Cumbrae and the Isle of Arran. This vital link is clearly at
risk from coastal change should the defence to the railway not be maintained or if there was longer term
erosion of the dunes. 
At a more local level, there are areas of industrial and commercial use immediately behind the railway,
together with important local road links and a major caravan park, all within the lower lying hinterland. 
While property within the towns of Saltcoats and Steveston have been subject to flooding on more
extreme events such as Strom Eowyn (January 2025), over the longer term there is an increasing
potential risk of coastal flooding associated with sea level rise. 
The whole coastal strip is also a highly valued and well used active travel route, linking from Stevenston to
Largs, both through the dunes and along the promenade. The Stevenston dunes, the open ground behind
the dunes and the foreshore and beach are considered to be an essential open space for recreation and
amenity. Currently there are community facilities, and a well-used car park situated immediately behind
the dunes, which supports and expands the use of the area beyond that of residents of Stevenston,
highlighting the importance of the area across the wider North Ayrshire area. 
Notwithstanding the important amenity value of the area, ad hoc pedestrian trampling, particularly through
the dunes, threatens both the ecological function and physical integrity and resilience of the dunes to
coastal change. In discussion with local residents and users of the area, undertaken as part of the
Stevenston Beach Coastal Study, key features of value include: the access via the slipway at the eastern
of the Promenade, the local headland formed by the spoil heap and the access to and use of the beach to
the east of the Steveston Burn. More generally, the connectivity along the whole Stevenson Beach for
both walking and horse riding has been identified as being a critical feature of the area.     
Natural and Historic Environment
To the north of the CCAP area is the Ardrossan to Saltcoats Coast Site
of Special Scientific Interest (SSSI) and Geological Conservation
Review (GCR) site. This SSSI is notified for its Carboniferous-Permian
Igneous Geological feature. 
This site was discussed in the SEA developed as part of the SMP
development process. 
Figure 2-2: SSSI designated area.
302

Page 303

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 12 
The SEA concluded that, no impacts are expected on this SSSI from the proposed shoreline management
measures owing to a lack of any identifiable impact pathway. This has been reviewed in developing the
Local CCAP and confirmed. 
More locally the Stevenston Beach area is designated both as Local Nature Reserve (LNR) and Local
Nature Conservation Site (LNCS). The area defined as the LNR is shown in Figure 2-3 (the image is taken
from Stevenston Beach Local Nature Reserve Management Plan 2018) covering the western area of
dunes. There is an ambition to extend this area to cover the full extent of the LNCS, extending the
boundary over the eastern area of dunes and the Stevenston Point. 
The Stevenston Beach Local Nature Reserve Management Plan 2018 identifies a range of different
habitats and features, including: Dune slack, dune heath, fixed and mobile dunes that are all regarded as
priorities under the European Habitats Directive. 
The Plan notes that, given the scarcity of sand dune habitat in
southwest Scotland makes the LNR particularly Important. The
reserve is particularly unusual in that it supports a succession
of most types of dune formation - from embryo dunes to mobile
foredunes to fixed dunes and dune slack – stretching over
200m inland.
Figure 2-3: Stevenston Beach LNR. 
Key threats to the reserve are identified as being:
• from coastal erosion; although there is a recognition that, in addressing this, this should not
constrain natural development of the area. 
• from pedestrian trampling. The key access points to the area are shown on the image in Figure
2-3, although it should be noted that the bridge over the railway line between the Caravan Park
and the dunes has now been closed and that forward bridge access point 6 is no longer available
due to change in the position of the Stevenston Burn. 
While the area has an important industrial heritage, including both Steveston Point and the spoil heap,
there are no specific built heritage features considered to be at risk from coastal change. 
The Environmental Report, developed from the SEA and HRA as part of the SMP process did highlight the
presence of the Ardrossan to Saltcoats Coast Site of Special Scientific Interest (SSSI) and Geological
Conservation Review (GCR) site, alongside the Local Nature Reserve (LNR) and Local Nature
Conservation Site (LNCS). However, with respect to the SSSI it was concluded that there was unlikely to
be any significant effect. 
With respect to the LNR and LNCS, while there was a risk associated with any extension of hard defences
impacting on the dunes, the use of soft engineering works was considered to mitigate and potentially
enhance the value of the dunes. The potential impact of ongoing erosion of the Spoil Heap was, however,
noted, recognising that, following further investigation, should this be an issue, this impact would need to
be mitigated. 
The HRA concluded that there would be no direct, indirect or cumulative impacts on nature conservation
interests, particularly those with statutory protection such as Natura sites.  
303

Page 304

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 13 
2.1.1 Key Issues and Objectives.
Issues
From the above description the key issues are in relation to:
• The risk to the railway line and the hinterland area inland of the railway.
• The potential increased flood risk to property within Saltcoats and Stevenston. 
• The potential longer-term risk to the railway line due to erosion of the dunes. 
• The risk to the active travel route behind the dunes and along the Promenade. 
• The ongoing erosion and coastal change to the dunes and the potential impact on and impact of
the recreational use of the area. 
• The need to maintain the open space use of the area. 
• The management of the transition between the hard defence of the Promenade and the natural
dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination alongside
considering the impact on use and coastal change.
• The important landscape and natural environment of the area. 
Objectives for Management (including those defined by the SG2023 guidance).
The following core objectives are set for management of the area, based on the issues identified above:
• To minimise, as far as possible, reliance on hard coastal management. 
• To support the natural development of the shoreline, considering opportunity for enhancing the
natural function of the area, with a focus on adaptation to coastal change. 
• To maintain the important regional transport network.
• To maintain and, as far as possible, to enhance the active travel interconnectivity across the area. 
• To maintain and, as far as possible, to improve access to the use and enjoyment of the important
amenity and recreational value of the area (recognising the potential impacts on the natural
function of the area and the need to improve access for different coastal users). 
• To consider and address the transition between the existing hard defence to the west and the
natural dune line. 
It is noted that to some degree there may be conflict in fully achieving all objectives and that all objectives
may not, therefore be achievable.
2.1.2 Previous studies and current policy
There have been a number of previous studies undertaken covering this frontage, including; 
• Irvine to Ardrossan Coastal Study (Royal Haskoning 2005)
• Ayrshire Shoreline Management Plan (RPS, 2018)
• Dynamic Coast 
• Stevenston Climate Action Town Workshops (2023)
• Community Led Adaptation Plan Climate Action Towns Final Report (February 2024)
• Stevenston Beach Coastal Study (Royal HaskoningDHV, 2025) 
Previous Policy and Current Management
The current SMP Policy Unit 6c2.1 encompasses Ardrossan to Stevenston Point. 
The plan for Policy Unit 6c2.1 is to hold the line across the short-term, medium-term and long-term. This
overall policy at the scale of the SMP, takes account of the significant infrastructure and property at risk
over the northern part of the policy unit. The Plan also recognises the specific nature of Stevenson Beach. 
304

Page 305

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 14 
In particular, the Plan recognised the dunes at Stevenston as a whole and as part of the overall defence
system to the hinterland. Recognising the erosion that was occurring, the SMP recommended the need to
manage erosion at Stevenston beach, promoting the use of soft engineering methods to do so. 
The Community Led Adaptation Plans recognised the ongoing problem of erosion to the Steveston Beach
and that with Climate Change this would present challenges for management. Overall, the Adaptation
Plan recognises the need to manage the area in a manner sympathetic to coastal change avoiding the
need for hard defence. 
305

Page 306

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 15 
2.2 Physical Baseline 
2.2.1 Coastal Form and Geomorphology
The frontage extends across the lower lying valley running to the east back through the town of
Stevenston (Figure 2.4). The valley is formed by the higher ground to the north, underly much of
Saltcoats, and by the higher ground running back from Stevenston Point. Typical, ground levels within
the valley are around 4.5m OD to the back of the coast, rising to around 6m OD to 7m OD further
inland. 
The higher ground to the north runs out to the rock outcrop underlying Saltcoats Harbour. This rock
outcrop and the harbour structures form the northern headland to the Local CCAP area. 
The nature of the higher ground running inland from Steveston Point is understood to have been built
up with colliery waste over the natural dunes. Steveston Point was constructed out by deposition of
waste out over the naturally sandy foreshore. The Point was constructed over the early part of the last
century and now acts as the southern headland to the area, influencing the behaviour of the southern
foreshore and, effectively separating the Local CCAP area from the coastal interaction with the
shoreline running south along the Ardeer Peninsula. 
Figure 2-4: Projections of erosion from Dynamic Coast. 
The constraint imposed by the two headlands has allowed further development of the natural dune
system. This natural alignment has, however, been significantly altered and advanced by the
construction of the railway and the hard defence (The Promenade) to the railway line. 
Quite clearly, as a result of the construction of the Promenade, the foreshore width has been squeezed
over the northern section of the frontage, with progressive lowering of the beach in this area. In the
absence of this defence, it seems probable that dunes the dune system would have extended further to
306

Page 307

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 16 
the north, across the valley but set back typically by some 150m compared to the current defence
alignment. 
More specifically across the Stevenston Beach area, historically there has been a progressive process
of erosion, driven to a large degree by an apparent reduction of sediment feed to the overall
embayment, but also, potentially by the construction of the Promenade. 
In addition to increased erosion at the backshore, this has manifested in significant change to over the
foreshore and the reduction in the dune spit across the mouth of the Steveston Burn. 
Associated with this change, there has been a progressive emergence of the base of the Spoil Heap
(the Headland), which is having an increasing impact on the development of the western dunes system. 
With sea level rise there will be increased pressure on the defence along the Promenade, increased the
erosion at the end of the Promenade and general increased erosion over the whole length of the dune
system. With further emergence of the spoil heap, this continues to erode at a slower rate. 
A more detailed assessment of the geomorphological development and change is covered in the
Stevenston Beach Coastal Study. 
2.2.2 Tide and water levels
Table 2-1 sets out the Tide and extreme waters relevant to the area, including the projection of water
levels with sea level rise. 
Table 2-1: Water levels (baseline 2024) with change in water levels with sea level rise based on UKCP18 RCP8.5 95%’ile. 
Base year
2024
Water levels with Climate change sea level rise
2050 2075 2100 2125
Astronomic Tide levels
Mean low water
Spring (MLWS) -1.3 -1.12 -0.84 0.49 -0.08
Mean low water Neap
(MLWN) -0.7 -0.52 -0.24 0.11 0.5
Mean high water
Neap (MHWN) 0.90 1.08 1.36 1.71 2.1
Mean high water
Spring (MHWS) 1.5 1.68 1.64 1.83 2.7
Highest Astronomic
Tide 2.01 2.15 2.34 2.57 3.21
Extreme water levels
1 in 1 yr. (T1) 2.68 2.87 3.14 3.14 3.88
1 in 10 yr (T10) 3.09 3.28 3.55 3.55 4.29
1 in 50 yr (T50) 3.39 3.58 3.85 3.85 4.59
1 in 100 yr (T100) 3.52 3.71 3.98 3.98 4.72
1 in 200 yr (T200) 3.65 3.84 4.11 4.46 4.85
Note all values given as m. OD. 
Astronomical tidal levels shown in Table 2-1 derived from POLTIPS for the nearest ‘Standard Port’ of
Irvine, with present day extreme water levels based on the 2017 Boundary Conditions report. 
307

Page 308

308

Page 309

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 18 
Figure 2-6: Longshore wave energy. 
Significant to the management of the area, the Figure shows that effectively, for all wave directions,
over the Sandylands Promenade section the longshore energy is towards the south towards Stevenston
Beach. However the plot also shows that for the dominant wave directions the magnitude of this
southerly drift potential tends to fall off suggesting a low drift over the western section of dunes. 
Within the lee of Steveston Point the drift rates tend to be more typically towards the north. 
In interpreting this, it is noted that as sediment was lost from the foreshore in front of the Promenade,
there would be a reduced sediment supply to the dunes, with a tendency for the pattern of erosion to
move to the east. However, importantly the plots also highlight that across the southern section of the
bay and extending part way back across the dunes there would tend to be sediment accretion. 
Key Interactions
From the above, rather than the Promenade defence disrupting the sediment drift pattern, it has been
the reduction of sediment supply from the foreshore to the west that has resulted in the erosion to the
frontage to the east. Furthermore, the plot shows the significant benefit derived from the shelter
provided by Steveston Point in creating an area of relatively stability over the east beach area. 
2.2.5 Primary Control Features
The primary control features associated with the area are the two main headlands, creating the overall
bay shape. 
Within the embayment, the Promenade defence fixes the position of the shoreline and has historically
influenced the supply of sediment to the east. When first constructed, the prom resulted in sediment
being lost from the foreshore in front of the wall. This would have initially benefited the dunes until the
309

Page 310

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 19 
beach supply was exhausted, subsequently reducing this supply as further erosion of the coast was
prevented. 
The development of the local headland forming at the Spoil Heap will, over time, increasingly influence
the developing shape of the western part of the Stevenston Beach area, tending to retain the alignment
of the dunes to the west but also, potentially limiting change between the headland and the Burn. 
2.2.6 Coastal Change
Historic
Past coastal change at Stevenston Beach has been assessed using geo-rectified historic maps that are
available to view on the National Library of Scotland’s website (Map images - National Library of
Scotland (nls.uk)). Further detail on historical change can be found in the coastal management study. 
In summary of historical change, it is seen that there has been significant longer term change and
erosion across the main area of the bay and that:
• As the backshore has set back this has exposed features within the local hinterland which have
had a more significant influence on the shoreline shape – most notably at the spoil headland
and in relation to the outfall.
• As the backshore sets back this has created a more distinct interface between the hard defence
to the west and the more natural area of dune.
• The set back of the shoreline and reduction of the larger dune system has had less influence on
the position of the back channel to Burn, such that the Burn now encounters the shoreline much
closer to where the channel cuts initially to the shore. 
Present day 
Google Earth air imagery together with available Lidar has been used to examine recent coastal
change. Phase I and Phase VI Lidar was obtained from the Scottish Government Remote Sensing
Portal with Lidar covering 2011/12 and 2021/22. 
Recent coastal change can be summarised as follows: 
• There has been ongoing erosion immediately to the south of the northern slipway, with erosion
at a typical rate of around 0.6m/yr.
• The dune between this area of erosion and the spoil headland has remained relatively stable.
• The influence of the spoil headland has become more evident, with deposition of spoil at the
crest of the beach. However, at the eastern side of the headland there appears to have been
ongoing erosion of the cliff face at a typical rate of around 0.2m/yr. 
• There has been substantial erosion of the dune spit to the western side of the Burn. The head
of the spit has retreated to the west and is now, effectively in line with upstream alignment of
the Burn. The face of the dune has set back in the order of 10m.
• Apart from change directly associated with the position of the outfall channel of the Burn, the
backshore to the east of the Burn has remained relatively stable with some potential accretion. 
Notwithstanding local change and variation due to storm periods and periods of local beach building, it
is concluded that the overall change is quite fundamental and will continue to develop in the future.
Future projections
With sea level rise the whole alignment of the frontage will attempt to roll back, adjusting to the
increased water depth and consequential increase in wave heights. 
310

Page 311

311

Page 312

312

Page 313

313

Page 314

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 23 
2.3 Discussion of Management
2.3.1 General
No Active Intervention
In line with the SG2023 guidance the starting point for assessing ongoing management is an initial
presumption that the coast should be allowed to evolve naturally, moving away from maintaining existing
defences. In effect this presumption aims to challenge the perspective that just because defences are
currently in place they should be maintained. This aims to test the benefit that existing defences deliver
alongside examining the degree to which defences might realistically be sustained over the longer term,
considering also what capacity there is for adaptation to change. 
In terms of the overall area, the main coastal defence is the seawall fronting the Promenade. This protects
the use of the Promenade, the railway line and, over the longer term, protects critical areas of the
hinterland. Recognising the current deterioration of the defence and the worsening of the situation with
sea level rise this current defence might be expected to fail in, potentially 20 to 50 years’ time. Under this
general scenario, no action would be taken to repair the defence and failure over the wider area would
rapidly occur, with progressive and quite rapid erosion potential and eventually back by some 150m into
the hinterland. 
This would have major consequence both locally and in terms of use of the much wider area. 
Assuming that a major “clean-up” operation was undertaken, the erosion of the frontage has potential to
release additional sediment to the coastal system, with potentially some benefit to the dunes but, over the
longer-term, with the whole bay re-adjusting to a more natural alignment, which would continue to roll
back. 
Under this effective No Active Intervention approach, there would be continued erosion of the Stevenston
Beach dunes as discussed in Section 2.2.6 but with no active management of the use of the area. While
there would be some continued natural development of the foredune area, this would continue to be in
conflict with the use of the area. 
With Current Management
The current SMP policy is for Hold the Line (HTL) over the whole area. However, over the Stevenston
Beach area this policy was qualified, suggesting that, in detail, holding the line would involve the use of
soft engineering methods, although no specific details were provided as to what this might involve. 
Holding the Line over the Promenade area would require significant future investment to address both the
increasing risk of undermining and increasing risk of overtopping. Critically, the current level of the
promenade is typically set at a level of around 4.6m OD, with a crest wall over the critical area set at
around 5.5m OD. While it might be feasible to increase the height of the wall, adapting in this way would
have serious consequences in terms of the use of the promenade and on the visual appearance of the
defence. Over the full 100 years considered by the CCAP, it is noted that the promenade would be
submerged typically during a 1 in 50 year extreme water level event. 
More strategically, continued defence of the promenade based on the current linear approach to
management, would hold the alignment of the defence at its eastern end, increasingly in advance of the
alignment of the of the dunes to the east, increasing the discontinuity between the two frontages.     
In terms of the dune system, in the recent past, attempts have been made to install sand fencing and local
soft engineering approaches to management as suggested by the SMP. Due to the pressure from erosion
314

Page 315

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 24 
and the fundamental system changes occurring, such works have not been successful. The Stevenston
Beach Coastal Study has examined this in more detail and concludes that without major sediment
restoration, which would involve major intervention and would only be feasible at a wider scale
encompassing the promenade area, to effectively hold the line there would be the need for, potentially
locally, hard intervention. 
This, together with the issues relating to the transition between the Promenade and the dune, the potential
release of contaminated material from the exposed spoiled heap and the longer-term issues around
maintaining and manging the use of the area, poses a significant challenge in delivering the HTL policy set
out in the SMP. 
This overall assessment of management is taken forward in considering setting specific policy for the two
CCAP Policy Units, recognising that interaction between the two areas. 
315

Page 316

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 25 
2.3.2 6c2.B1 - Sandylands Promenade
2.3.2.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention (NAI)
A No Active Intervention (Do Nothing) approach would result in the continued degradation of the sea wall
and promenade. This would ultimately lead to the increasing rates of overtopping associated with sea
level rise which would affect the functionality of the promenade and have a significant impact on the long-
term viability of the railway. 
The wall and promenade would ultimately fail, likely due to undercutting and washout of the wall toe, or
due to failure of the superstructure. Failure of the wall would result in the loss of the Promenade and the
railway line and over the longer-term significant loss and disruption to the current use of the hinterland.
There would be significant negative economic impacts on the towns of Saltcoats, Ardrossan and
Stevenston associated with the loss of the railway. These would also contribute to regional and national
losses. 
There is little or no opportunity for sensible and appropriate adaptation to these impacts. A No Active
Intervention approach is not considered to be an acceptable approach due to these impacts. Critically, this
assessment assumes the realistic continued use and importance of the railway line over the long term. In
the long term future (one hundred years and beyond) this would need to be reviewed, given the increased
pressure on the defence. 
Manged Realignment (MR)
Given the proximity of the railway and the associated value of the Promenade in providing an important
and valued active travel route, there is very limited or no opportunity for managed realignment of the
existing defence line. This option is not, therefore considered viable. 
Again, critically, this assessment assumes the realistic continued use and importance of the railway line
over the long term. In the long-term future (100 years and beyond) this would need to be reviewed, given
the increased pressure on the defence. Should, in the future, there be any discussion related to the
ongoing use and alignment of the railway line, then this option would need to be considered further,
considering any opportunity this might give to realignment of the defence. 
Hold the Existing Line (HTEL)
Under this current management approach potentially over the next 20 years it might be possible to adopt a 
Do Minimum approach, sustaining the existing sea wall, with the potential need to extend the local area of
rock toe to reduce overtopping and address under mining. Beyond this period, a basic Do Minimum
approach would become increasingly difficult to sustain. Ultimately, this would result in the promenade
and railways being regularly affected by overtopping to the point where they could not be used safely. 
In developing this forward, to sustain the existing form of defence, there is likely to be the need to
substantially raise the crest of the wall and potentially over the long-term increasing the level of the
Promenade and continue to extend and improve the rock toe. Further into the future, this strictly linear
approach to maintain the defence is likely to become increasingly unsustainable. 
Alternative approaches might, therefore, be needed. Examples include the potential for a full rock
revetment and/or shore linked or nearshore breakwaters. There might be options to undertake major
beach recharge, however, from an outline assessment undertaken by the Stevenston Beach Coastal
Study, this would require significant import of sediment to provide an adequate longer-term protection to
the sea wall. 
316

Page 317

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 26 
In considering potential options for delivery of HTEL to the Promenade, consideration would need to be
given to the potential impact on the Steveston Beach dunes and, specifically should beach recharge be
undertaken, consideration of potential wider impacts on the SSSI to the north. 
More immediately, there has been significant deterioration at the eastern end of the Promenade,
potentially impacting on the integrity of the Promenade defence and for erosion to threaten the railway. In
line with the basic principles set out for development of the CCAP, the policy for Unit 6c2.B1 would be to
avoid further extension of the linear approach further into Policy Unit 6c2.B2, imposing hard control over
the natural development of the dunes. This is discussed further in developing policy for the Stevenston
Beach area. 
The above discussion of policy options is summarised below in concluding the recommended policy for
PU 6c2.B1. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 2-3 below.
Table 2-3: Policy Assessment - 6c2.B1-Sandylands Promenade
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints and
opportunity
No Active
Intervention
(NAI)
Abandon
defences, no
further
investment
Fails to deliver core
objectives for the area.
Not considered
acceptable
Major change – limited
adaptive capacity,
impacting on both
strategic and local
values and use of the
area.
Managed
Realignment
(MR)
Remove
defences and
reconstruct on
a setback line.
Limited or no width for
realignment without loss of
strategic assets.
Not considered
viable
Major change – limited
adaptive capacity,
impacting on both
strategic and local
values and use of the
area.
Improve
existing
(HTEL)
Maintain and
improve. 
Meets core objectives subject
to further consideration of
specific options.
Increasing longer term (100
year) investment.
Viable Further consideration
of interaction with
Policy Unit 6c2.B2.
Long-term review.
Sub- Options:
Do Minimum -
Short term
maintenance
Ongoing investment,
becoming increasingly
unsustainable beyond year
20.
Not considered
sustainable
over the
medium term
Requires longer term
planning.
Rock
revetment and
raise
Direct improvement to
existing wall becoming
increasingly unsustainable.
Potentially not
considered
sustainable
over the
medium to
longer term
Potential impact on
use of area. Longer-
term sustainability
issues.
317

Page 318

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 27 
Breakwaters /
Nearshore
Rock
Structures 
Reduces exposure to existing
defences with potential to
improve beach. May still
require direct enhancement of
the beach.
Viable Secures existing
defence over the
medium to long term-
term. 
Beach
Nourishment
Reduces exposure to existing
defences. 
Increases sediment supply
along frontage to south. 
Potentially
viable in
combination
with another
option.
Secures existing
defence over the short
to medium-term. 
From the above, the policy over both the short and long term is for Holding the Existing Line. 
The assessment, however, highlights key trigger decision points in relation both to the need for
considering longer term options and in terms of the interaction between this unit and management of
Steveston Beach. This is considered in setting out the overall Dynamic Adaptive Pathway and Action Plan
for the Local CCAP area in Section 2.4.   
2.3.2.2 Consultation
Initial discussion has been held with Network Rail on their long-term ambitions for the management of the
defences fronting the railway. 
In developing the Steveston Beach Coastal Study initial discussion has been held with NatureScot and
other stakeholders in considering broader issues potentially relating to the wider area. Points raised during
this process have been considered in developing the initial assessment of policy options for this CCAP
Policy Unit. 
As the Local CCAP is taken forward, further discussion would be undertaken with respect to individual
elements of the Plan, building on the consultation that took place during the development of the SMP and
the detailed public and stakeholder consultation undertaken as part of developing the Stevenston Beach
Coastal Study. 
318

Page 319

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 28 
2.3.3 6c2.B2 - Stevenston Beach
2.3.3.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the continued erosion of the dunes over
the western part of the frontage. In particular, this would be most pronounced at the interface with the
promenade, where the slipway is already at risk of becoming outflanked. Continued erosion of the dunes
in this section would result in the outflanking of the seawall and promenade and lead to the failure of the
slipway and ultimately may contribute to failure of the seawall resulting in significant, possibly catastrophic
impacts on the railway. 
The ongoing erosion of the dunes north of the Stevenston Burn would result in further exposure of the
spoil heap located in the central section of the frontage. The composition of the spoil heap is currently
unknown, although initial inspection has not highlighted significant issues. A No Active Intervention
approach would result in the spoil heap being eroded and its contents dispersed into the environment. 
Under this approach, along the eastern section of the frontage, the complex pattern of erosion and
accretion around the Stevenston Burn would continue. The only control to this erosion being a concrete
outfall structure situated in the centre of the eastern section of dunes. 
Under a No Active Intervention approach it is taken that there would be no specific management of the
use of the area, resulting in uncontrolled footfall through the dune system. This is already seen as being a
significant issue and threat to both the ecological diversity and physical structure of the dunes. As such,
this approach fails to deliver the potential for enhancement of the area. Unmanaged pedestrian pressures
would contribute to erosion of the dune crest and potentially blowouts, increasing the risk of coastal
erosion to the hinterland. Furthermore, it would fail to address longer term adaptation in an integrated
manner. 
While in principle, a No Active Intervention approach is seen as allowing the general natural development
of the dunes system, there are key issues that would not be addressed, specifically:
• Failing to address the issues associated with the transition between the hard defence to the west,
with the risk of further ad hoc management and extension of hard linear defence extending across
areas of dune. 
• Failing to further explore and address the potential risk associated with erosion of the spoil heap. 
• Failing to address the issue associated with ad hoc trampling of the dune system. 
• Failing to address and raise awareness and potential need for ongoing adaptation over the longer
term in relation to the car park and facilities associated with the important amenity and
recreational use of the area.
• Fail to address and consider potential opportunity for longer term management of the area of
marsh. 
On this basis, a No Active Intervention policy is not considered to address the issues of management and
the objectives for the area. 
Manged Realignment (MR)
The Stevenston Beach Management study has examined the potential for soft engineering approaches to
management of the issues identified above. This examination concluded that typical soft engineering
approaches would not be appropriate due to the ongoing pressure on the frontage. 
319

Page 320

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 29 
However, in considering such approaches the coastal study did conclude that there would be significant
benefit in considering ways in which the use of the area could be modified and adapted to address much
of the human pressure on the dunes and natural environment. An outline assessment and management
plan has been defined by the coastal study. This assessment promotes:
• The need to sustain and improve the condition of the slipway at the end of the Promenade,
integrating this with development of a longer term modified approach to managing the transition,
both securing the Promenade defence and addressing the longer term risk to the railway due to
erosion of the dunes. This would, however, require significant engineering works, with the
potential to construct a small shore connected breakwater. 
• Focussing access from the open space and car park behind the dune along the line of the existing
outfall, currently seen as being important in locally managing the dunes and influencing the
position of channel of the Stevenston Burn over the foreshore. This, over time, may require further
minor engineering works to reinforce the outfall route, while allowing more natural development of
the dune over adjacent areas. 
Further management activities would be put in place, developed with stakeholders and the community,
looking at how sign posting, fencing and potentially locally enhancing and rationalising the internal foot
path network. 
Alongside this, the current approach would be to allow the spoilt heap to erode naturally, while
undertaking ongoing monitoring of potential contamination. Under this MR approach, the intent would be
to allow continued erosion but recognising that this would need to be kept under review, with the potential
need for some form of future longer-term defence. 
It is recognised that a MR policy as set out above, would require hard engineering works at the slipway
and in manging the transition between the Promenade and the dunes and that there may be the need for
local intervention at the outfall and possibly at the spoil heap headland. However, the overall approach
aims to provide the same basic outcome as intended by the SMP in minimising intervention and allowing
natural adaption of the dunes. Associated with this the approach aims to set up the structure for adapting
use of the area working within the constraints of future coastal change. 
Managed realignment, as set out above, is considered to be viable and in line with both the principles
discussed in SG2023 and in best delivering the objectives for management. 
Hold the Existing Line (HTEL)
Taking a more rigorous perspective of holding the existing line of defence, resisting the natural erosion of
the dunes over the whole area is considered unnecessary, unsustainable and undesirable, failing to
deliver the objectives set out for the CCAP. A such this option is not considered to be appropriate. 
The above discussion of policy options is summarised below in concluding the recommended policy for
PU 6c2.B2. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 2-4 below. 
320

Page 321

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 30 
Table 2-4: Policy Assessment - 6c2.B2 Stevenston Beach
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints and
opportunity
No Active
Intervention
(NAI)
Abandon
slipway and
allow erosion
of the dunes. 
No
intervention to
manage
erosion of
dunes.
While notionally, allowing
natural ongoing evolution of
the dunes, this option would
fail to address important
issues including the risk to the
promenade and the railway
line and in failing to promote
adaption of use within the
area. 
Not
considered
acceptable
Major change – with no
view to creating a
structure for adaptation.
Managed
Realignment
(MR)
Sustain the
promenade
slipway
through
intervention.
Allow for the
natural
development
of the dunes. 
Provides a sustainable
approach to management of
the transition area.
Allows natural realignment of
the dunes across the
remainder of the frontage,
while locally managing critical
issues.
Viable Secures critical defence
over the medium to long
term. 
Establishes a framework
for ongoing adaptation. 
Improve and
extend
defences.
(HTEL)
Protect area
against
erosion.
Severe impact on the natural
development of the dunes.
Not
appropriate
Longer-term
sustainability. Severe
impact on the natural
environment. 
From the above, the policy over both the short and long term is for Managed Realignment. The approach
to manage of the transition will need to be developed in detail in partnership and with further discussion
with statutory stakeholders and the community. 
There remains some degree of uncertainty with respect to management of erosion to the spoil heap, this
would be reviewed as part of ongoing management, based on further monitoring. 
Management of access points to the shoreline will subject to ongoing review with the intent to adapt and
modify the approach. 
The overall access management will be developed as an ongoing process with stakeholders and the
community, while recognising the longer term need for further adaptation to coastal change.
2.3.3.2 Consultation
The Stevenston Beach Coastal Study informed a suite of consultation activities undertaken with a broad
range of stakeholders. The consultation undertaken on the draft coastal study report were successful in
raising awareness of the Ayrshire Shoreline Management Plan and the Coastal Study itself. The vast
majority of questionnaire respondents felt that the consultation had been successful at raising awareness
of the issues faced at Stevenston Beach. 
The consultation identified a stakeholder group who had not previously been engaged with, being the
equestrian community. Via the British Horse Society (BHS), and members of the public, a number of
specific considerations were raised with regards to access which had not previously been considered.
321

Page 322

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 31 
The consultation has confirmed that there is a broad level of support for access management at
Stevenston Beach, supporting the conclusions of the coastal study report. 
A major issue raised throughout the consultation process relates to ongoing engagement. This is fully
supported by NAC and how this is best undertaken will be considered in developing the overall approach
to management.  
322

Page 323

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 32 
2.4 Summary of Local CCAP 
The overall intent of the Local CCAP recognises the need to maintain defence of the Sandylands
Promenade (subject to ongoing funding arrangements) to secure important strategic and local assets and
infrastructure. Notwithstanding the increasing pressure on this defence, particularly with sea level rise, it is
considered that this can be undertaken in a sustainable manner. Consideration needs to be given to
possible alternative forms of defence. Typically, this would need to be considered over the next 20 years
as the basic ‘Do Minimum’ approach becomes increasingly difficult to sustain. Over the far long-term (100
years and beyond), continued defence may require significantly greater investment. This longer-term issue
will require ongoing review, particularly as longer-term planning is undertaken as to the railway line. 
Over the Stevenston Beach area, the intent is to generally allow natural ongoing coastal change. As part
of this, the intent is to develop, with the community and stakeholders a modified structure for managing
access along and through the dunes. The aim of this is to minimise the impact on the dunes while still
maintaining the important use and recreational value of the area. This approach will recognise the ongoing
change to the dunes and will be adapted as part of ongoing management. 
The Plan recognises and discusses the important interaction between the hard defence to the Promenade
and the natural dune system. The intent of the Plan is to manage this area without the encroachment of
the hard defence further to the east. The Stevenston Beach Coast study sets out in outline the manner in
which the transition could be managed. This approach requires further detailed development and funding,
with this potentially becoming critical over the next 10 to 20 years. This approach is being discussed with
Network Rail and further discussion with stakeholders. To a degree the approach to short term
management of the slipway will depend on the outcome of these discussions but the intent is to sustain
this important slipway as part of the emerging access plan. 
There are, as identified above, several key decision points in developing the Local CCAP for this area in
relation to triggers for change with respect to the form of defence to the Promenade (20 years) and in
relation to developing the detail with respect to the transition zone (10years). 
In addition, there is a degree of uncertainty with respect to the ongoing erosion rate to the dunes and the
potential issues associated with management of erosion to the spoil heap. These uncertainties will, to a
degree, be addressed through monitoring, recognising the CCAP will require ongoing review. 
In outline, the critical trigger and decisions points are highlighted in the Dynamic Adaptive Pathway set out
below (Section 2.4.1.1). 
Based on this, an initial Action Plan has been developed as set out in Section 2.4.1.2. 
Within the Local CCAP two distinct but interconnected CCAP Policy Unts are identified and the
recommended policy for each area is set out in Table 2-5. 
Table 2-5: Summary of high level CCAP policies
Local CCAP Policy Unit  Short term
Policy 
Longer term
Policy 
Notes 
6c2.B1-Sandylands
Promenade
HTEL HTEL Need to develop medium to longer
term approach.
6c2.B2 Stevenston Beach MR MR Ongoing adaption to coastal change
with local intervention.
323

Page 324

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 33 
The Local CCAP updates and provides greater clarity and detail with respect to management of individual
sections of the coast as compared to the single Policy Unit defined by the SMP. In principle, however, the
overall intent of management remains similar; with the intent to sustain the defence to Sandylands
Promenade, while allowing a more adaptive approach to management of the Stevenston Beach frontage. 
In particular, the approach to management set out in the Local CCAP reinforces the need to consider
mitigation measures discussed in the SMP, in:
• Considering alternative options for management of the Sandylands Promenade specifically in
terms of its interaction with the wider area.
• Considering management of the transition between the hard defence line and the natural dunes,
minimising the need to further extend the hard defences to the east. 
• Allowing a more adaptive approach to management of potential contamination arising from
erosion of the Spoil Heap.
• Allowing the natural evolution of the dunes, while encouraging development of a coherent Access
Management Plan for the area. 
This remains in line with and addresses the key issues identified in the SMP SEA Environmental
Statement. 
Alongside this, the CCAP has identified the potential opportunity for further habitat enhancement in
providing the policy structure for revision of the Stevenston Beach Local Nature Reserve Management
Plan and in identifying the potential for future change to the marsh area associated with the Stevenston
Burn. 
2.4.1 Coastal Change Adaptation and Action Plan
The Local CCAP aims to provide a policy structure for delivery of ongoing adaptation to coastal change.
As part of this, and within this high-level structure, there are clear elements that will need to be considered
in detail, recognising also that there remain uncertainties principally associated with the time scale and
rate of change in sea level rise.   
Within the Plan, therefore, there are key points in time when decisions will need to be made. Such
change, will be driven by change in the physical conditions impacting on the coast and, typically, by
subsequent change in condition or standards of defence and the level of risk or the natural response of
the coast. These are referred to as Trigger Points. 
Associated with this, there are certain enabling actions which will be required to allow change to occur or
further investigations or discussion which will determine the specific management response. These
actions will culminate in decisions need to be made. These are referred to as Decision Points.
2.4.1.1 Dynamic Adaptive Pathway
Figure 2.10 sets out the critical Trigger Points and the associated Decisions Points, setting out where and
how actions and decisions will allow the Local CCAP to be developed into the future.   
As identified in Figure 2.10, the aim is to ensure that the necessary discussion and additional
investigations are undertaken in a timely manner such that informed decisions are made in advance of
when any Trigger Point is reached. The Actions associated with the Pathway are set out in the Action Plan
in Section 2.4.1.2. 
324

Page 325

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 34 
Figure 2-11: Dynamic Adaptive Pathway
Key: 
325

Page 326

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 35 
2.4.1.2 Action Plan
The key actions taking forward the Local CCAP are set out in Table 2-6.
Table 2-6: Local CCAP Action Plan
Action Description Notes  Timescale
Year
(trigger)
Sandylands Promenade
1 Continue to maintain existing hard defences Secures defence over the
short term, allowing
consideration of longer-term
options.
1 (20)
2 Highlight and raise awareness of short to
medium-term risk and support preparation of
option planning
Ensures continuity of
management across the
wider area.
1 (20)
3 Raise awareness of very long-term
sustainability issues.
Maintain long-term
awareness of possible
issues in relation to review of
forward planning
20 (100)
Stevenston Beach and transition
4 Ongoing discussion with Network Rail and
statutory stakeholders with respect to transition
area.
Determines further
development of specific
coastal management
options.
1 (5 to 10)
5 Undertake further development of option(s) for
transition area
Detailed option study 1 (5 to 10)
6 Undertake short term measures to sustain
slipway
Needs to be integrated with
longer-term options for
management of transition. 
2 (5 to 10)
7 Ongoing monitoring of spoil heap, with
potential need for further investigations
Longer term planning of local
options for management of
spoil heap. 
3 (15)
8 Develop and implement improved access point
associate with outfall. 
Improves access and
management of the change.
Also exemplifies potential
options for general access
management
1 (3)
9 Further discussion and development of access
management plan with community.
Progresses development of
overall access plan, allowing
opportunity for funding.
2 (5)
Broader Area
10 ongoing monitoring Allows review of trigger
points and informs decisions
ongoing 
326

Page 327

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 36 
3 Local Coastal Change Management Plan 6c2.D
Irvine Harbour and Irvine Beach
The development of the Local CCAP is set out with an initial discussion and description of the larger
CCAP area and subsequent discussion of management of the two specific policy unit areas. The final
section brings this together in summarising the intent of the Local CCAP. 
Overall Plan area: 
• General Characterisation: 
o Description, 
o Identification of key features, issues and objectives.
o Previous studies and current management policy, 
• Physical Baseline:
o Geomorphology, 
o Tide and water levels and sea level rise
o Wave climate
o Sediment transport and control features,
o Coastal change and flood risk 
Discussion of Management:
• General discussion over the wider area.
• Local Area (CCAP Policy Unit) assessment
o Initial Screening of Policy Options 
o Consultation 
Summary of Overall Plan
• Overall intent of management
• Policy Summary
• Coastal Change Adaptation and Action Plan
o Dynamic Adaptative Pathway
o Action Plan 
A detailed study (Irvine Beach Coastal Study – RHDHV 2025) of the Irvine Beach has recently been
undertaken, providing more local detail and making specific recommendations for management. This
Local CCAP 6c2.D draws strongly on this study, aiming the capture the higher level issues, providing the
more strategic context in line with the SG2023 guidance. 
This report is provided (under separate cover) as Appendix 3A to this CCAP assessment. 
327

Page 328

328

Page 329

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 38 
hub. This reflects the importance of the area to the town of Irvine and more generally, strategically, to
North Ayrshire, with the important historic links to the maritime environment. 
Irvine beach area comprises a relatively wide sandy beach, stretching south towards Troon and is largely
backed by a dune system, although the form and behaviour of the dune and hinterland use varies along its
length. 
The northern section of the beach has a long industrial history, previously housing both a Royal Ordnance
Factory and an Iron and Chemical works. The site has largely been restored to grassed amenity lands at
the northern end but signs of the past remain. Most obviously, the historic past is evidenced in this area by
the massive spoil heap some 500m south of the Harbour, with the toe of the mound now becoming
exposed by erosion. This large mound has been converted into a viewing point with a sculpture known as
‘the dragon.’ 
Further south, where the toe dune has been eroded there are further signs of the industrial heritage, with
remnants of fencing and local buildings now being exposed. Further south the slightly more stable dune is
backed by a golf course with features of the golf course relatively close to the back of the dune. 
Social and Built Environment
There are properties typically to the back of the road running along the harbour area, typically developed
at the same level as the quay at a level of around 4.1m OD. The Harbour is currently an active port with
around 40 moorings and the road acts as an important access route to the Harbour Entrance and as
access to the main car park for Irvine Beach. 
As identified earlier the area is an important open space forming the basis for the development of the
Great Harbour Masterplan. Recent development along the Harbour has been encouraged in an effort to
reinvigorate this important historical area. Signs of the success of this are evident in the repurposing of
sites, including the Harbour Arts Centre. 
The area is therefore considered important to the general regeneration efforts as an important attractive
waterfront and coastal destination for local day visitors and tourists. With the Local Development Plan
supporting the development of a ‘Maritime Mile’ at the Harbourside to make the best use of the
Harbourside’s unique location, heritage, and environment to create new opportunities for local people and
to attract new investment into the area (Great Harbour Master Plan 2023). 
The main northern area of Irvine Beach provides an
extremely well-used open space with a high amenity
and reactional value, linked through to the important
open space behind the Harbour and the integrated
use and appeal of the wider area. 
The diverse use of the northern part of the open coast
is highlighted in the Strava Global Heatmap shown in
Figure 3.2.  
This highlights both the use of the beach and the
direct hinterland to the back of the dunes. 
Figure 3-2: Current active use based Strava's Global Heatmap.
329

Page 330

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 39 
Further south, the beach area and hinterland continue to be well used, although more generally for
walking rather than specific static beach use. Over the southern part of the frontage the beach is well used
but the hinterland is occupied by golf courses (the Royal Troon and the West Gailes). 
Natural and Historic Environment
Two nationally designated SSSI areas are shown in Figure 3-3:. To the north is the Bogside Flats SSSI
encompassing the larger area of the Garnock
Estuary. It is noted that this site abuts the
Harbour area. Within the area of the open coast
is the West Gailes SSSI, focussing on the dunes
and extending back across part of the golf
courses. 
The dune system covered by the West Gailes
SSSI is critically dependent on maintaining the
continuity of sediment supply necessary in
sustaining the dunes. 
Figure 3-3: Designated sites. 
In addition to the designated sites the natural environment is highly valued by users of the area. 
The Environmental Report, developed from the SEA and HRA as part of the SMP process did highlight the
proximity of the Bogside Flats SSSI and the presence of the West Gailes SSSI, included within the Local
CCAP area. 
With respect to the Bogside Flats SSSI the main potential impacts were considered in assessing policy
relating to the management of the main estuary area, although the Environmental Report did note that
design of any works along the Harbour frontage would need to consider possible influence on this SSSI,
particularly during construction. 
The main potential impacts on the West Gailes SSSI related to change in sediment supply and, more
directly in relation to any works undertaken in addressing ongoing erosion to the dune and the capacity of
the dune to adapt to coastal change. 
The potential impact of ongoing erosion of the Spoil Heap was noted, recognising that, following further
investigation, should this be an issue, this impact would need to be mitigated by some form of
management but that this would also need to consider the potential impact on coastal process and
sediment supply. 
The HRA concluded that there would be no direct, indirect or cumulative impacts on nature conservation
interests, particularly those with statutory protection such as Natura sites.  
3.1.1 Key Issues and Objectives
Issues
From the above description, the key issues are in relation to:
• The potential risk to the use and regeneration of the Harbour area with sea level rise.
330

Page 331

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 40 
• The risk to the active travel routes and open space behind the dunes and further south to potential
users of the golf courses. 
• The ongoing erosion and coastal change to the dunes and the increased pressure on the dunes
from excessive and ad hoc use of the dunes. 
• The ongoing erosion of the spoil heap considering potential release of contamination.
• The important landscape and natural environment of the area, specifically the ongoing change to
the West Gailes SSSI. 
Objectives for Management (including those defined by the SG2023 guidance).
The following core objectives are set for management of the area, based on the issues identified above.
• To minimise, as far as possible, reliance on hard coastal management 
• To support the natural development of the shoreline, considering opportunities for enhancing the
natural function of the area, with a focus on adaptation to coastal change 
• To maintain defence to the Harbour area and raise awareness of any need for adaptation.
• To maintain and, as far as possible, to enhance the interconnectivity across the area. 
• To maintain and, as far as possible, to improve access to the use and enjoyment of the important
amenity and recreational value of the area (recognising the potential impacts on the natural
function of the area and the need to improve access for different coastal users). 
• To consider and address the potential for the release of contaminated material form the spoil
heap. 
It is noted that to some degree there may be conflict in fully achieving all objectives and that all objectives
may not, therefore be achievable.
3.1.2 Previous studies and current policy
There have been a number of previous studies undertaken covering this frontage, including; 
• Irvine to Ardrossan Coastal Study (Royal Haskoning 2005). This study principally considered
the coastal processes and potential management options for the coast north of the Garnock;
however it does provide some information on sediment movement and wave climate relevant to
the area .
• Ayrshire Shoreline Management Plan (RPS, 2018): The Ayrshire SMP provides sustainable
shoreline management policies for the Ayrshire frontage across three epochs; the short, medium
and long term. 
• Dynamic Coast: The Dynamic Coast project aims to provide the strategic evidence base on the
extent of coastal erosion in Scotland. This will support the Scottish Government and the Scottish
Public Sector decision-making and indicate areas of highest coastal erosion risk, where a more
detailed evidence base may be required. The project focuses on:
o Improving evidence of coastal change.
o Raising awareness about coastal erosion.
o Supporting decision-makers to help Scotland’s coast adapt to future climate impacts. 
• Irvine Great Harbour Masterplan (NAC, 2024): the core elements of the wider masterplan
include the development of the maritime mile waterfront walkway, the provision for additional
Beach Drive housing and the regeneration of the coastal hinterland.
• Irvine Beach Coastal Study (January 2025): In 2024 Royal HaskoningDHV were commissioned
to develop a coastal study at Irvine Beach. The Scope of the Coastal Study was to develop:
o A Natural Flood Risk Management study to identify suitable and implementable erosion
management for the dune system at Irvine Beach, in line with the adopted Ayrshire SMP.
331

Page 332

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 41 
o The identification and outline design of suitable measures to improve, manage and
safeguard beach access, given the anticipated pressures on Irvine Beach from the effects
of North Ayrshire Council’s Great Harbour Masterplan.
Previous Policy and Current Management
The current SMP Policy Unit 6c2.3 encompasses the whole Irvine Bay to Gailes Burn area. The plan for
Policy Unit 6c2.3 is to hold the line across the short-term, medium-term and long-term. 
Notwithstanding this overall policy at the scale of the SMP, taking account of the potential assets at risk,
specifically at the entrance to the Harbour and the important recreational use of the area, the plan
identified the need to sustain the overall function of the dunes – hence the policy for hold the line. 
However, the SMP recognised that the dunes provided this function as a whole and recognised the need
to manage erosion, promoting the use of soft engineering methods to do so. 
In the medium to long-term, erosion of the dune system will continue to require management. The effects
of climate change will create additional pressures and dune stabilisation measures may need to be
updated and extended. Flood defences on the River Irvine may need to be improved in order to provide
adequate flood protection. 
332

Page 333

333

Page 334

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 43 
At the entrance to the estuaries, it has been recorded from previous studies that sediment tends to
move into the estuary on the Flood tide but then it is exported and deposited as a bank (and ebb delta)
in the nearshore area. 
There has, apparently, been little consistent or substantial change in the form and size of this
nearshore bank, suggesting also that sediment might be expected to be redistributed from the bank
back to the shoreline. 
Clearly as the shoreline has been cut back the general movement of sediment, distributes sediment
along the shore. 
Local to the entrance channel, the shoreline both to the north and south is reported as having been
areas of very local accretion. 
With sea level rise; with increased water depth and increased wave heights at the shore, there will be
an acceleration of the general process of set back with increased rates of erosion. 
Within the estuary, it may be seen that the Harbour area does to some extent constrain and fix the
general curve of the Irvine channel. Some slight pressure for bed erosion in this area may be
expected, although there are no reports of undermining to this area. 
The land levels within the wider area of the Garnock Estuary are relatively low, with substantial areas
only just above HAT. With sea level rise the normal tidal prism within the main estuary has the
potential to increase quite sharply, potentially increasing flows through the narrow entrance channel.
This could influence the development of the nearshore ebb banks, potentially giving rise to change at
the foreshore. 
While the Irvine Beach Coastal study has identified significant local variation in the form and function of
different sections of the dune, from a geomorphological perspective the most significant change in
geomorphology is due to the emergence of the toe of the large waste mound tending to modify locally
the behaviour of the dunes to either side. 
3.2.2 Tide and water levels
Table 3-1 sets out the Tide and extreme waters relevant to the area, including the projection of water
levels with sea level rise. 
Astronomical tidal levels shown in Table 3-1 derived from POLTIPS for the nearest ‘Standard Port’ of
Irvine, with present day extreme water levels based on the 2017 Boundary Conditions report. 
Projections of water levels with Climate Change and sea level rise are taken from the United Kingdom
Climate Projections 2018 (UKCP18) project. 
In line with the guidance provided by SG2023, the UKCP18 8.5 95 percentile value for sea level rise
has been used. 
334

Page 335

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 44 
Table 3-1: Water levels (baseline 2024) with change in water levels with sea level rise based on UKCP18 RCP8.5 95%’ile. 
Base year
2024
Water levels with Climate change sea level rise
2050 2075 2100 2125
Astronomic Tide levels
Mean low water
Spring (MLWS) -1.3 -1.12 -0.84 0.49 -0.08
Mean low water Neap
(MLWN) -0.7 -0.52 -0.24 0.11 0.5
Mean high water
Neap (MHWN) 0.90 1.08 1.36 1.71 2.1
Mean high water
Spring (MHWS) 1.5 1.68 1.64 1.83 2.7
Highest Astronomic
Tide 2.01 2.15 2.34 2.57 3.21
Extreme water levels
1 in 1 yr. (T1) 2.68 2.87 3.14 3.14 3.88
1 in 10 yr (T10) 3.09 3.28 3.55 3.55 4.29
1 in 50 yr (T50 3.39 3.58 3.85 3.85 4.59
1 in 100 yr (T100) 3.52 3.71 3.98 3.98 4.72
1 in 200 yr (T200) 3.65 3.84 4.11 4.46 4.85 
3.2.3 Wave Climate
A nearshore wave climate was determined as part of the modelling undertaken in the Irvine to
Ardrossan Coastal Study (2005). The wave climate determined for a position just offshore of Saltcoats
Harbour is shown in Table 3-2 and Figure 3-5.  
Table 3-2: Irvine wave climate. 
Figure 3-5: Wave Climate.
335

Page 336

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 45 
The dominant wave sector is from the south to west, with the most frequent wave coming from the
southwest but with the high waves also approaching the area from both the south southwest and west. 
3.2.4 Sediment Transport
The Irvine to Ardrossan Coastal Study (2005) provides a general assessment of sediment drift across
Stevenston Bay under different wave conditions. This is shown in Figure 2.6. 
Rather than attempting to derive specific sediment transport rates, this plot indicates the variation in
longshore wave energy under different wave directions. 
Figure 3-6: Longshore wave energy. 
The Figure shows significant variation in wave energy direction between Ardeer and Troon. Specific to
the Local CCAP it may be seen that there is a general southerly drift from the Irvine Estuary but that
for the dominant wave directions this potential for drift reduces towards the south. 
This would suggest that approaching West Gailes and Gailes Burn, while there is still a weak drift
further south the Gailes area might typically accrete. 
Key Interactions
Assuming that there continues to be some supply over the Irvine beach area, then the supply would
continue to feed the important SSSI area to the south. As and if the spoil heap continues to emerge at
the shoreline and subject to management of this, there is a potential impact that could occur. Any
management in this area of the spoil heap would need to be manged to minimise and mitigate such
change. 
336

Page 337

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 46 
3.2.5 Primary Control Features
The primary control feature associated with the area is the Harbour Pier. At present this appears to
only have a minor local function in holding beach levels directly to the south of the structure. 
Coastal Change
Historic
Past coastal change at Irvine Beach has been assessed using geo-rectified historic maps that are
available to view on the National Library of Scotland’s website (Map images - National Library of
Scotland (nls.uk)). Further detail on historical change can be found in the coastal management study. 
In the 1900s, the hinterlands were dominated by a network of Iron and Chemical works interconnected
by a rail network. Through a review of historic mapping, the presence of many colliery heaps was
noted and these are largely still present on site today. 
An analysis has been undertaken of the longer term historic change based on comparison of MHWS
since 1897 together with an assessment of more recent change based on a comparison of Lidar.
These results are then used to provide the baseline conditions from which to consider potential future
change with increasing sea level rise. 
Generally there appears to have been relatively significant erosion across the whole area between
1897 and 1958, most particularly over the length south from the Harbour entrance, with the shoreline
adopting a more embayed shape. This is possibly linked to the progressive training works to the
Harbour entrance influencing the shoreline to the south – while the entrance channel has been
managed since the early part of the 19h century, it was in the latter part of the 19th century that saw the
construction of the main harbour pier. 
Since 1958, erosion has been significantly less with evidence of slight accretion in some areas. 
Caution has to be applied to these results, in part due to inherent inaccuracies in interpreting historic
mapping but also in considering changes in management that may have influenced the earlier rate of
change.
Present day 
The Coastal Management Study developed an analysis based on 15 cross-shore profiles covering the
main study area and extended this analysis to the south. 
Considering the longer term historical rates of change the general rate of erosion has been in the order
of 0.4m/yr (on average between 1897 to 2010) and 0.1m/yr to 0.3m/yr (on average between 1958 to
2010). This compares to the more recent (2010 to 2022) change at the frontage to either side of the
failing gabion defence to the spoil heap being in the order of 0.4m/yr. 
This would suggest, potentially, that:
• If there had been no defence in place, the frontage as a whole might have eroded back at a
rate of around 0.2m/yr (ignoring the possible influence of the presence of the spoil heap),
• With the defence in place, the erosion immediately to the north and south has increased
marginally to around 0.35m/yr on average. However, if the defence were maintained over the
longer-term, typically, the defended area would form a slight headland in the alignment of the
backshore, with the area to the north potentially being controlled to a degree with a lower rate
of erosion but the area to the south still being subject to a higher rate of erosion. 
337

Page 338

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 47 
• If the defence were now removed or failed, there would be a rapid period of erosion, cutting
back initially by some 5m, but that the erosion would then adjust back to the slower rate of
around 0.2m/yr. 
The Coastal Management Study developed this analysis and projected these erosion rates onto the 15
cross-shore profiles to generate future projections.
Future projections
Projections of sea level rise are as shown in Table 3-3 based on UKCP18 RCP8.5 95%’ile. These
values are rebased to 2024 and extended for the Lower and Baseline scenarios through to 2124.
Table 3-3: Projected rates of sea level rise.
Scenario SLR (m) – base year 2024
2044
Year 20
2074
Year 50
2104
Year 80
2124
Year 100
Baseline: UKCP18 RCP8.5 (95%ile) 0.13 0.46 0.87 1.17 
This analysis built upon the higher-level assessment provided by Dynamic Coast. 
Figure 3-7 shows the indicative erosion profile assuming initially (a) that the defence to the spoil heap
is maintained, with the second plot (b) showing the equivalent erosion for 2050, 2075, 2100 and 2125 if
the defence was allowed to fail and no further works were implemented. 
Figure 3-7: projected future erosion distances. 
It is assumed that in the case where the spoil heap is not defended this section would still erode more
slowly due to the additional volume of material and the potentially greater resistance of the material
being exposed. (In line with this assumption the erosion rate for the spoil heap area is assumed to be
half of the natural erosion of a dune.) 
Significantly, however, is the degree to which the defended frontage, if held, will be in advance of the
naturally developing shoreline and this may impact or influence management of other areas.
338

Page 339

339

Page 340

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 49 
2050 
2075 
2100 
2125 
Figure 3-9: Future Flood Risk
340

Page 341

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 50 
3.3 Discussion of Management
3.3.1 General
As identified earlier, while it is considered important that management of the two areas: the Harbour area
and the open coast, are considered in an integrated manner. In terms of risk and adaptation the longer-
term risks are quite different and development of future management policy can, to a degree, be
considered separately. 
Within this Section consideration is given to the implications of management under the two baseline
scenarios of No Active Intervention and With Current Management. This then forms the baseline from
which to assess potential alternative options. 
No Active Intervention
In line with the SG2023 guidance, the starting point for assessing ongoing management is an initial
presumption that the coast should be allowed to evolve naturally, moving away from maintaining existing
defences. In effect this presumption aims to challenge the perspective that just because defences are
currently in place that they should be maintained. This aims to test the benefit that existing defences
deliver alongside examining the degree to which defences might realistically be sustained over the longer
term, considering also what capacity there is for adaptation to change. 
With respect to the Harbour, quite clearly allowing deterioration of the Harbour defences and taking no
action to address the longer-term flood risk would result in loss of property and, loss of the road /
operation of the important harbour. 
It would fail to support the efforts for regeneration and improved access to open space. 
In addition to the impact on the Harbour, No Active Intervention would severely constrain the use of the
open coast. 
More specifically over the open coast, while under this No Active Intervention approach it is only to the
south, in the area of the golf courses, where there might be significant loss of specific of assets. No Active
Intervention would fail to address the significant impact of ad hoc trampling within the dunes resulting in
the loss of both ecological function and physical damage to the integrity of the system. 
One of the main issues presently facing the frontage is the significant number, and size, of dune blow outs
as a result of access routes to the beach. It is apparent that a number of these large blow outs are then
subsequently being used as sheltered rest locations which is only aggravating the erosion. 
The development of the coastal hub and events space potentially adds to this risk in the future, particularly
over the northern area of the beach. If not mitigated, the notable increase in foot traffic (particularly during
any events) could lead to terminal erosion of the dunes. 
No Active intervention also fails to address the key risk of potential contamination due to erosion of the
spoil heap, representing a potential health risk and a potential risk to the quality of the environment. 
With Present Management
In terms of the Harbour area the current policy is for holding the line to support the current and future
development of the area. Under present conditions this approach seems appropriate meeting the core
objectives for the area. 
341

Page 342

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 51 
Over the longer term the risk of direct flooding due to sea level rise substantially increases and as part of
the policy for Holding the Line there would need to consider what adaptation measures might be put in
place to mitigate this risk. 
Over the open coast, while the policy for the area is Hold the Line, the SMP recommends that this should
use soft engineering approaches. 
Options to control access through the dunes all fall under the general dune restoration approach (noted
within SEPA’s Natural Flood Management Handbook). It is envisaged that a combination of fencing,
thatching and planting would be utilised to control the movement of people and encourage the use of
designated access points. A review against the masterplan would be required to ensure linkage with the
hinterlands and ensure efficient access routes are designed that minimise the risk of people creating their
own desire lines. 
It is thought that parallel access routes within the dune themselves could be reinforced by boardwalks to
prevent trampling. The alignment of these would be designed such that it recognises the want for the dune
to roll back in response to sea level rise. 
As such the current policy (as qualified by the SMP) is seen as being a sensible way ahead over the
northern section of the open coast. This does however raise the issues both in relation to addressing the
potential risk of contamination form erosion of the spoil heap and further south in with respect to longer-
term management of erosion to the dunes in front of the golf courses. 
This overall assessment of management is taken forward in considering setting specific policy for the two
CCAP Policy Units. 
342

Page 343

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 52 
3.3.2 6c2.D1 - Irvine Harbour
3.3.2.1 Initial Screening of Coastal Change Adaptation Policies
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the continued degradation of the harbour
structures, including quay walls and pontoons. This would ultimately lead to the condition of the harbour
deteriorating to the point where it was unsafe to use. In the medium to long term, sea level rise would
result in increased rates of overtopping and the harbour structures would deteriorate to the point where
they failed. Overtopping and eventual failure of the structures would render the Irvine Harbour frontage
unsustainable, there would be an associated increased flood risk to the highway, and residential and
commercial property. 
Failure of the harbour structures would result in the wider area along Harbour Street becoming unusable.
Locally, there would be a significant negative economic impact on the town associated with the loss of the
harbour. This would also contribute to regional and national losses. 
Furthermore, the important opportunity for place development and regeneration would be lost. A No Active
Intervention approach is not considered to be an acceptable approach due to these impacts. 
Managed Realignment (MR)
Due to the integral use of the harbour associated with the line of defence there is no realistic position for
realignment of the defence. 
Notwithstanding this fundamental constraint, in looking at future management and mitigation for increased
flood risk, there may be scope for incorporating some form of future flood defence within any landscape
design of the Harbour waterfront. This, however, would be better defined as future adaptation associated
with Holding the Existing Line. 
The Managed Realignment is not considered to be realistically achievable. 
Hold the Existing Line (HTEL)
Under this policy option the aim would be to maintain the current Harbour Quay and other defences
including the Harbour Pier. Currently, there is no significant barrier to achieving this. As noted above,
there would be the need to mitigate the potential increased flood risk and this could be achieved by a
basic approach in raising the current level of the quay and associated defences. 
Equally and possibly more in keeping with the aim to maintain an active harbour and to improve the
character and visual aspect of the area, consideration would need to be given to future flood risk and
formal / informal flood defences with any landscape works being undertaken. 
Typically, the key trigger for improvement might in around 50 years’ time, However, awareness of this
longer term risk would allow the opportunity to be taken for improvement at any stage prior to this. 
Policy Summary Assessment
A strategic assessment of options is set out in Table 3-4 below. 
343

Page 344

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 53 
Table 3-4: Policy Assessment - 6c2.D1 - Irvine Harbour
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints  and
opportunity
Do Nothing
(DN)
Abandon
harbour and
defences, no
further
investment.
Substantial impact on local
and regional economy with
loss of opportunity for
regeneration.
Not
considered
acceptable
Major change – limited
adaptive capacity
Managed
Realignment
(MR)
Remove
defences and
reconstruct on
a setback line.
No width to establish a new
defence alignment.
Not
considered
realistically
achievable
No scope for adaptation
Improve
existing
(HTEL)
Maintain and
improve.
Significant ongoing
maintenance 
Viable Need for longer term
adaptation and mitigation
of flood risk.
Sub-options:
Raise along
quay
Direct improvement to quay
walls with potential need for
further future works.
Viable  Potential impact on use
of area. Longer-term
sustainability issues
constraining future
adaptation.
Landscaped
flood defence
Secures defences and could
reduce the need for raising
defences the front face
maintaining operation of the
Harbour. 
Requires consideration as
part of general improvements. 
Viable Secures existing defence
over the long term. 
From the above, the policy over both the short and long term is for Holding the Existing Line. 
The assessment highlights the need to consider the longer-term risk within future improvement more
generally to the area. 
3.3.2.2 Consultation
The above assessment of policy confirms the previous policy defined by the SMP. No further detailed
consultation has been undertaken on the proposed CCAP policy at this stage. In taking forward the CCAP
there would be further consultation undertaken on specific elements of the CCAP.   
344

Page 345

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 54 
3.3.3 6c2.D2 - Irvine Beach to Gailes Burn
3.3.3.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the ongoing erosion of the dunes
throughout the frontage. Even further south, in the Gailes area, where currently it is reported that the
dunes remain relatively stable, with sea level rise, there would be a progressive roll back of the dunes. 
This issue would be aggravated over the northern section of the frontage by the intensity of use. With no
efforts being taken to manage this pressure there would be further damage to the ecological function and
physical integrity of the dunes. 
More immediately, the gabion baskets at the defended spoil heap are already in a poor condition with a
potential effective residual life in the order of 5 to 10 years. They would continue to break up and would
cease to defend the toe of the spoil heap resulting in erosion of the spoil. It is not currently known to what
degree the contents of this spoil heap pose a significant risk. 
Under this policy, regardless of the potential risk posed by the spoil, spoil would be dispersed on the
beach and into the environment. This requires further investigations. 
Without first determining the nature of the spoil heap, A No Active Intervention approach is not considered
to be an acceptable approach due to the risk of contaminated spoil entering the environment. 
Where the spoil is demonstrated to be non-contaminated, then a No Active Intervention approach could be
considered. However, it is recognised that even under this approach, some degree of access
management is likely to be required in order to manage localised erosional pressures associated with high
levels of footfall. This is particularly critical given the ambitions of the Irvine Great Harbour Masterplan
which anticipates that visitor numbers will increase. 
Manged Realignment (MR)
Given the issues identified above, it is almost certain that some form of management would be required,
although the approach to management would be different over different sections of the area. 
Over the northern section of Irine Beach, under this option the focus of management would be in
managing the intense pedestrian pressure. Typically this would take the form formalising specific access
points, co-ordinating this with travel route and use of the open area behind the dunes. This is considered
in more detail in the Irvine Beach Coastal Study. As highlighted in the study report, there would need to be
consideration of whether such access points might require local physical control or whether it would be
more appropriate to allow more regular adjustment in response to coastal change. Whichever choice is
made, the aim would be to work within the natural coastal change rather than acting to resist such change. 
This general approach would extend over the dunes further to the south ensuring the opportunity is
provided for natural dune restoration while maintaining selected access points for all coastal users. 
Over the southern section of the whole area, further detailed consideration would need to be given to the
possible need for long-term adaptation in the use of the two major golf courses, looking to sustain the
natural protection provided by the dunes by creating greater width within the system. This takes a more
realistic approach to management given difficulty of sustaining a hard approach to defence within a
naturally changing backshore. 
345

Page 346

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 55 
The spoil heap poses a more difficult challenge. Subject to critical further investigation into the nature of
material within the spoil heap and the degree of risk this might pose a range of options for management
have been considered by the Irvine Beach Coastal Study. 
While locally this might be better described in terms of policy as Hold the Existing Line, within the wider
context of management of the whole policy unit it is still considered appropriate to consider this under this
assessment of a broader Managed Realignment approach. 
Other options, identified include:
• Digging out and disposing of contaminated material. This option would have a very large and
ongoing cost and was not considered sensible.
• A staged approach to slow rates erosion, potentially affecting some areas of erosion but limiting
this and more slowing introducing control structures. 
All these options would need to be developed further in detail, specifically considering the potential wider
scale impact on coastal processes but also integrating any approach to sustain travel routes along the
shore and hinterland. 
In summary, under this approach to management, the underpinning principle for the existing dunes would
be to allow natural change to occur, looking to manage and develop approaches for adaptation and
management of use. At the spoil heap, the same underlying principle would apply but recognising that
depending on nature of material within the spoil heap there might be the need for hard defence. 
Overall, Managed Realignment is considered to correctly describe, as above, an approach that would be
sustainable and would work within the underlying objective set out for a CCAP. 
Hold the Existing Line (HTEL)
While as set out above, subject to further investigation of the nature of the spoil heap, there could be the
need to hold the existing defence to the spoil heap, a general policy of holding the overall dune line would
be consider unsustainable, unaffordable and unacceptable in relation to the CCAP objectives. This policy
option is not considered viable. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 3-5 below.
Table 3-5: Policy Assessment - 6c2.D2 Irvine Beach to Gailes Burn
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative
capacity,
constraints  and
opportunity
No Active
Intervention
(NAI)
No
interventions
to manage
erosion of
dunes.
Substantial impact on
existing environment,
including erosion of
potentially contaminated
spoil heap.
Not considered
acceptable
Major change –
limited adaptive
capacity
Managed
Realignment
(MR)
Manage
change while
minimising
physical
intervention
Allow for the natural
realignment of the dunes.
Specific options to be
considered for the spoil
heap.
Viable and
appropriate
Capacity to adapt to
change. 
346

Page 347

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 56 
Improve
existing
(HTEL)
Maintain,
improve and
extend linear
defence
Major impact on the
natural environment.
Loss of beach and
increasing cost.
Unacceptable  Would fail to
engender
consideration of
adaptation. 
3.3.3.2 Consultation
The Irvine Beach Coastal Study informed a suite of consultation activities undertaken with a broad range
of stakeholders. The consultation undertaken on the draft coastal study report has been successful in
raising awareness of the Ayrshire Shoreline Management Plan and the Coastal Study itself. The vast
majority of questionnaire respondents felt that the consultation had been successful at raising awareness
of the issues faced at Irvine Beach. 
The consultation identified a stakeholder group who had not previously been engaged with which was the
equestrian community. Via the British Horse Society, and members of the public, a number of specific
considerations were raised with regards to access which had not previously been considered. 
The consultation confirmed that there is a broad level of support for access management at Irvine Beach,
supporting the conclusions of the draft coastal study report but that this needs to be developed further. 
In addition, the consultation has elicited useful responses on specific local issues, which are now recorded
and will be considered in ongoing development of management approaches. Furthermore, several
comments were made relating to broadscale issues and these have been considered in developing the
Local CCAP. 
With regards to management of the existing (current) defences, there was no objection to the
recommendations outlined within the draft coastal study report, recognising that options would be
developed further following investigation of the nature of material within the spoil heap . 
A major issue raised throughout the consultation process relating to ongoing engagement. This is fully
supported by NAC and how this is best undertaken will be considered in developing the overall approach
to management. 
It is noted that consultation focused on the northern (Irvine Beach) beach area. While the revised headline
policy for MR differs from the previous SMP headland policy of HTL, in practice the intent for considering
soft engineering approaches, expressed by the SMP, has been clarified and is considered to be better
captured by the proposed policy on MR. 
347

Page 348

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 57 
3.4 Summary of Local CCAP 
The Local CCAP has sub-divided the coast into two policy units with the aim to provide better clarity in
considering CCAP policy. While these two units have very different characteristic and therefore require
different polices, the Units have been grouped under one Local CCAP to reflect and raise awareness that
there are significant inter dependencies, in relation to overall use and access along the coast. 
Overall the intent of the Local CCAP is to maintain and as required manage access along and through the
area, sustaining the specific character and regeneration opportunities for the Harbour, while sustaining the
important natural development of the open coast. 
In detail for the Harbour it is consider sustainable to maintain the defence and use of the area. The CCAP
raises the awareness of potential longer-term increased flood risk with sea level rise, encouraging
consideration of address this future risk in developing detailed plans for the area. The physical trigger
point for adaptation might not occur for 50 years. However, increasing awareness of this risk potentially
allows his to be integrated in current decision making. 
With respect to the open coast Unit, it is proposed that the CCAP policy is revised to one of Managed
Realignment better reflecting and clarifying the implications of the previous caveated policy set by the
SMP. 
The CCAP policy for the open coast Unit is now defined as Managed Realignment. However, in detail, this
might need to be develop in different ways across different sections of the coast. Specifically:
Over the northern Irvine Beach area the intent is to develop in detail a management plan for managing the
intense pressure form use on the dunes. Underpinning this is the intent to minimise intervention at the
dune face, allowing for further adaptation of the access plan in response to coastal change. 
Over the critical spoil heap frontage, the final approach to management would need to be determined
based on further investigation of the nature of material contained within the spoil heap. Again, the
underlying intent is to allow, as far as possible and permissible, the natural development at the shoreline.
However, this recognises that there may need to be hard engineering works in this area to address
potential risks of release of contaminated material. 
Further south, particularly over the area of the golf course, the overall aim is to allow the natural
development and roll back of the dunes, maintaining the important integrity of the back shore area and
supporting the management intent set out in the SSSI designation. This recognises that there may,
therefore, be the need for some adaptation of the golf courses. This need to be considered further working
with the golf course to develop in detail a realistic and sustainable long term plan for management. 
Table 3-6: Summary of high level CCAP policies
Local CCAP Policy Unit  Short term
Policy 
Longer term
Policy 
Notes 
6c2.D1-Irvine Harbour HTEL HTEL Consideration of long-term
adaptation.
6c2.D2 Irvine Beach to
Gailes Burn 
MR MR Ongoing adaption to coastal change
with local intervention and
management plans. 
348

Page 349

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 58 
The Local CCAP updates and provides greater clarity and detail with respect to management of individual
sections of the coast as compared to the single Policy Unit defined by the SMP. In principle, however, the
overall intent of management remains similar; with the intent to sustain the defence to the Harbour
frontage, while allowing a more adaptive approach to management of the Irvine Beach frontage. 
In particular, the approach to management set out in the Local CCAP reinforces the need to consider
mitigation measures discussed in the SMP.
• With respect to the Harbour, the Local CCAP recognises the need to address the increased flood
risk with sea level rise. In examining this, two different options are identified. In developing these
options, in addition to considering the potential impact on the landscape and use of the area, there
would need to be consideration of how the potential impact on the Bogside Flats SSSI might be
minimised and mitigated.  
• Further investigation is required into the nature of material contained within the Spoil Heap and
the potential impact that ongoing erosion of the Spoil Heap would have on the marine
environment. This would be taken forward through development of the Local CCAP.
• Associated with the above, the Local CCAP identifies the need to consider and mitigate the
potential influence any management would have on sediment supply along the shoreline, with
particular reference the potential impacts on the West Gailes SSSI.
• More generally, the overall intent to allow ongoing natural development of the dunes would
maintain the pattern of sediment movement along the frontage minimising the impact on the West
Gailes SSSI.
• The Local CCAP recommends the development of specific management plans for adaptation of
the West Gailes area.   
This remains in line with and addresses the key issues identified in the SMP SEA Environmental
Statement. 
Furthermore, developing the Access Management Plan aims to balance the need to maintain important
and values use of the open coast alongside sustaining a healthy dune system. 
3.4.1 Coastal Change Adaptation and Action Plan
The Local CCAP aims to provide a policy structure for delivery of ongoing adaptation to coastal change.
As part of this, and within this high-level structure, there are clear elements that will need to be considered
in detail, recognising also that there remain uncertainties principally associated with the time scale and
rate of change in sea level rise, alongside the present uncertainty associated with the nature of material
contained within the Spoil Heap.   
Within the Plan, therefore, there are key points in time when decisions will need to be made. Such
change, will be driven by change in the physical conditions impacting on the coast and, typically, by
subsequent change in condition or standards of defence and the level of risk or the natural response of
the coast. These are referred to as Trigger Points. 
Associated with this, there are certain enabling actions which will be required to allow change to occur or
further investigations or discussion which will determine the specific management response. These
actions will culminate in decisions needing to be made. These are referred to as Decision Points.
3.4.1.1 Dynamic Adaptive Pathway
Figure 3.9 sets out the critical Trigger Points and the associated Decisions Points, setting out where and
how actions and decisions will allow the Local CCAP to be developed into the future.   
349

Page 350

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 59 
Figure 3-10: Dynamic Adaptive Pathway.
KEY 
350

Page 351

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 60 
As identified in Figure 3.9, the aim is to ensure that the necessary discussion and additional investigations
are undertaken in a timely manner such that informed decisions are made in advance of when any Trigger
Point is reached. The Actions associated with the Pathway are set out in the Action Plan in Section
3.4.1.2.
3.4.1.2 Action Plan
The key actions taking forward the Local CCAP are set out in Table 3-7. 
Table 3-7: Local CCAP Action Plan
Action Description Notes  Timescale
Year
(trigger)
Irvine Harbour
1 Continue to maintain harbour defences Secures defence over the
short to medium term,
allowing consideration of
longer-term options.
1 (50)
2 Highlight and raise awareness of longer-term
flood risk
Allows integration of
potential future risk withing
current planning
1 (50)
Irvine Beach and Spoil Heap
3 Detailed investigation of potential
contamination
Determines further
development of specific
coastal management
options.
1 (5 to 10)
4 Develop options for coastal management to
Spoil Heap.
Detailed option study 3 (5 to 10)
5 Detailed development of access plan. Working
with partners to agree position of access points
and approach to ongoing management
Needs to take account of
access management along
spoil heap area. 
3 (5)
Broader Area
6 Raise awareness of potential need for
adaptation to golf course frontages
Establish initial contact and
discuss how future planning
may be facilitated.
1 (20)
7  Ongoing monitoring Allows review of trigger
points and informs decisions
ongoing 
351

Page 352

North Ayrshire Council
Coastal Change Adaptation Plan
Summary Document
DRAFT
352

Page 353

Introduction to Coastal Change Adaptation Plans (CCAP)
Scottish Government produced interim guidance (SG2023) for development of Coastal Change
Adaptation Plans (CCAP) in February 2023. 
This national initiative recognises the ongoing and constant nature of change at the coast, considering
how we will need to adapt to that change in a sustainable manner; considering how we currently use
and value the coast but also looking forward as to how we may need to respond and adapt to the
increased rate of change due to Climate Change and, in particular, sea level rise.   
The guidance notes that over the last thirty years sea level across Scotland has risen between two
and three times faster than over the previous 100 years, with mean sea level anticipated to rise by
between 0.30-1.16 m by 2100. This will, in many areas, result in increased risk of flooding and
increased pressure on the coast for erosion. 
While it is accepted that there are some uncertainties both in relation to the actual rate and timescale
over which sea level rise will occur and uncertainties over how the coast will respond to such change,
and while there is still the need to explore further our capacity for change, the guidance emphasises
the need to start this process now:
• Raising the awareness of the challenges with individuals, communities, businesses and local
organisations, allowing people to plan for change, working within the broader structure
provided by the CCAP to shape their future. 
• Informing Local Development Plans as to future risk, identifying where future coastal
development should and should not be located.
• Helping to safeguard important and valued natural features, including those that can protect
the coast, alongside looking for opportunities for enhancing biodiversity and maintaining the
mosaic of interconnected habitats. 
• Taking a placemaking approach to deliver, as far as possible, multiple benefits across the
whole range of interest associated with the coastal zone.  
Critically, the guidance recognises the ongoing nature of coastal management. The aim is to develop
CCAPs based on the information already collated within Shoreline Management Plans (SMPs) and
building on information developed through further local studies alongside national data sets such as
provided by Dynamic Coast.
However, as part of the CCAP process, the aim is to critically examine how we currently manage the
coast, with the opportunity to challenge current practice from a longer-term, broader scale
perspective, ensuring that future challenges are identified and that short term decisions do not
constrain future opportunities.  
National Guidance - Principles and Objectives
The national guidance does not prescribe exactly how local authorities should develop their Coastal
Change Adaptation Plans (CCAP). Instead, it provides guidance as to what they should seek to
achieve and how it might be delivered. Importantly, the national guidance recognises that “one size
does not fit all”, and the guidance recognises the need to maintain flexibility for appropriate local and
regional CCAP delivery structures to emerge, recognising that CCAPs need to reflect the complexity
of local areas.
However, the guidance sets clear principles and objectives that the CCAP should work within.
Core Principles. 
• to create a vision for well-adapted and resilient management, properly integrated into other
policies by taking a more land use planning approach, avoiding locking-in future generations
to unsustainable actions, considering that sea levels are expected to continue to rise well
beyond the end of this century;
DRAFT
353

Page 354

• to seek opportunities to support and regenerate communities and address inequalities. In
particular, policy should anticipate that changes to property protection and property values will
increasingly come into focus as adaptation pathways are developed; and
• to deliver multiple benefits (for example economic, environmental or amenity enhancements),
and to promote sustainable infrastructure and work to preserve natural features and
ecosystems.
Key Objectives
In line with the core principles the following overall objectives of the CCAP are:
• To promote the resilience of our natural coastline and begin the process of adaptation to
climate change;
• To set out a process for a proactive approach to coastal adaptation planning that will
maximise opportunities and minimise risk from climate change impacts;
• To ensure our collective coastal adaptation journey starts now; and
• To support local authorities to begin the process.
Approach to developing North Ayrshire’s CCAP
The North Ayrshire coastline covers a length of some 150km of shoreline, including areas of the
mainland alongside the principal islands of Great Cumbrae and Arran. Within this length of coast,
there is large variation in the coastal character. In some areas such as the major towns there are
significant lengths of man-made protection. In many other areas there are small settlements alongside
many small ports and local harbours, all set within broader areas of natural shoreline. 
There is, therefore, a clear need to adapt the level of detail provided by the CCAP to reflect the local
nature of the coastline in any location and to maintain relevance to future management of specific
areas. The current SMP (RPS 2018) provides the initial background and structure in identifying the
broader interdependencies throughout the area, this provides the opportunity to focus in more detail
on individual areas. 
To this end, the approach being taken to the development of the North Ayrshire CCAP is to develop a
series of Local CCAPs. It is recognised that this process will be ongoing but it does also allow focus
on areas where further information and study has been carried out. The intent is to develop these
Local CCAPs in a consistent format around the whole coastline, ultimately allowing collation of these
Local CCAPs as one CCAP for North Ayrshire.
This Document
This document sets out the overall approach being taken to the development of the North Ayrshire
CCAP, as discussed above. As Local CCAPs are developed additional sections will be added
providing a summary and record of the how policy and Plans are being developed covering the whole
coastline. As Local CCAPs are developed the conclusions from the SMP will be reviewed and
updated with the intent that these summary documents will replace the SMP policy for each area.   
North Ayrshire Council have taken the opportunity provided by having undertaken two detailed local
studies to start this process and to develop Local CCAPs covering these areas. The two areas, so far
included are for:
• The Sandylands Promenade and Stevenston Beach (Local CCAP 6c2.B), and
• Irvine Harbour to Gailes Burn (Local CCAP 6c2.D)
DRAFT
354

Page 355

The Sandylands Promenade and
Stevenston Beach 
(Local CCAP 6c2.B)
Summary Document
DRAFT
355

Page 356

Context
General description
The Sandylands Promenade and Stevenston Beach, covering some 2.5km of coastline, is formed as
an effectively artificial embayment formed by the historic development of the southern Saltcoats
Harbour arm, constructed out over a natural rock outcrop, and Stevenston Point, which was formed
over the last century by tipping of mining waste.
The area is covered by two relatively distinct, although interconnected, sections.
The Sandylands Promenade, comprises a major sea wall protecting the railway line and providing
defence to lower lying land behind. The wall is fronted by a low intertidal foreshore with a thin veneer
of sand. Currently, the wall and promenade suffer significant overtopping during major storm events. 
The Stevenston Beach and Dunes, comprises an area of natural dunes extending back into an area
of important open space. The dunes and open space are included with areas designated as a Local
Nature Reserve (LNR) and a Local Nature Conservation Site (LNCS) highlighting the important
ecological value associated with the area. The dunes are currently eroding limiting the opportunity for
dune restoration. There is also significant human trampling causing damage to the dunes. As the
dunes have eroded, this has exposed the toe of an old mining waste spoil heap and this is eroding.
The area is cut by the Stevenston Burn, with the Burn running back into the town of Stevenston. The
channel of the Burn across the foreshore has been subject of significant change, influencing and
being influenced by coastal change.
A critical feature of the area is the transition between the hard defence along the promenade and the
natural section of dunes, with an increasing challenge to maintaing an important slipway and in
managing the transition between the two sections of the coast.  
The SMP context
The SMP (2018) defined the area within the general sub-
cell 6c2, with a further division of the wider area into four
SMP Policy Units. The Local CCAP area is contained
within SMP Policy Unit 6c2.1.
The general policy for this unit is for Holding the Line
(HTL) over the three epochs considered by the SMP.
However, there was an important caveat that, with
respect to Stevenston Beach, the intent was to manage
erosion of the dunes using soft engineering approaches.
In reviewing the SMP, as apart of developing the Local
CCAP, it has been agreed that the SMP Policy Unit
should be further sub-divided into two CCAP Zones:
• 6c2.A, covering Ardrossan and Saltcoats Harbour.
• 6c2.B, covering this Local CCAP area of the
Sandylands Promenade and Stevenston Beach
This retains the ability to consider the important broader
scale interaction across the whole Local CCAP area, with the definition of two CCAP Policy Units
6c2.B1 and 6c2.B2 reflecting the local characteristics of each local area.
SMP Sub-cells and
Policy Units.
DRAFT
356

Page 357

Coastal Change
The whole area has been subject to historical erosion, with, where the frontage has been defended
along the promenade, a loss of the natural beach. The artificial development of the Stevenston Point
has allowed some retention of sediment over the foreshore resulting lower rates of erosion of the
dunes at the eastern end. The construction of the defence along the Promenade has reduced the
supply of sediment to the dunes and increased erosion has occurred to the dunes immediately to the
east of the Promenade. As the dune line has eroded, this has exposed the toe of the historic Spoil
Heap and this is now acting to partially control the alignment of the frontage.  
With sea level rise the rate of erosion to the dunes will increase. The predicted erosion distances over
the next 100 years are shown in the images below. These erosion lines are based on the UKCP18 8.5
(95 percentile) sea level rise scenario, as recommended in the national guidance for CCAPs.  
Currently, there is relatively low flood risk within the area, although the Promenade and Railway are
subject to severe wave overtopping during major storms. With sea level rise, larger areas will be at
potential risk. This change is shown in comparing the current and future (2100) relative land levels
with respect to coastal water levels. The risk of overtopping of the Promenade wall will similarly
increase.
Management Issues
• The risk to the railway line and the hinterland area inland of the railway.
• The potential increased flood risk to property within Saltcoats and Stevenston.
• The potential longer-term risk to the railway line due failure of the defence and erosion of the
dunes to the east.
• The risk to the active travel route behind the dunes and along the Promenade.
• The ongoing erosion and coastal change to the dunes and the potential impact on and impact
of the recreational use of the area.
• The need to maintain the open space use of the area.
• The management of the transition between the hard defence of the Promenade and the
natural dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination
alongside considering the impact on use and coastal change.
• The important landscape and natural environment of the area.
Predicted erosion over the eastern and western sections of
Stevenston Beach in 20, 50, 80 and 100 years. 
Present day flood risk
areas
Potential flood risk
areas by 2100
DRAFT
357

Page 358

Policy Update
The overall intent of the Local CCAP recognises the need to maintain defence of the Sandylands
Promenade (subject to ongoing funding arrangements) to secure important strategic and local assets
and infrastructure. Notwithstanding the increasing pressure on this defence, particularly with sea level
rise, it is considered that this can be undertaken in a sustainable manner. Consideration needs to be
given to possible alternative forms of defence. Typically, this would need to be considered over the
next 20 years as the basic ‘Do Minimum’ approach becomes increasingly difficult to sustain. Over the
far long-term (100 years and beyond), continued defence may require significantly greater investment.
This longer-term issue will require ongoing review, particularly as longer-term planning is undertaken
in relation to the railway line. 
Over the Stevenston Beach area, the intent is to generally allow natural ongoing coastal change. As
part of this, the intent is to develop, with the community and stakeholders a modified structure for
managing access along and through the dunes. The aim of this is to minimise the impact on the
dunes while still maintaining the important use and recreational value of the area. This approach will
recognise the ongoing change to the dunes and will be adapted as part of ongoing management. 
The Plan recognises and discusses the important interaction between the hard defence to the
Promenade and the natural dune system. The intent of the Plan is to manage this area without the
encroachment of the hard defence further to the east.
The specific polices defined by the Local CCAP are set out in the table below.
Local CCAP Policy Unit Short term
Policy
Longer term
Policy
Notes
6c2.B1-Sandylands
Promenade
HTEL HTEL Need to develop medium to longer term
approach.
6c2.B2 Stevenston Beach MR MR Ongoing adaption to coastal change
with local intervention.
The Local CCAP updates and provides greater clarity and detail with respect to management of
individual sections of the coast as compared to the single Policy Unit defined by the SMP. 
The approach to management, set out in the Local CCAP, reinforces the need to consider mitigation
measures discussed in the SMP, in:
• Considering alternative options for management of the Sandylands Promenade specifically in
terms of its interaction with the wider area.
• Considering management of the transition between the hard defence line and the natural
dunes, minimising the need to further extend the hard defences to the east.
• Allowing a more adaptive approach to management of potential contamination arising from
erosion of the Spoil Heap.
• Allowing the natural evolution of the dunes, while encouraging development of a coherent
Access Management Plan for the area.
Alongside this, the CCAP has identified the potential opportunity for further habitat enhancement in
providing the policy structure for revision of the Stevenston Beach Local Nature Reserve
Management Plan and in identifying the potential for future change to the marsh area associated with
the Stevenston Burn.
DRAFT
358

Page 359

Critical Decisions
The following Dynamic Adaptive Pathway diagram highlights where critical decisions will be needed in
developing the CCAP into the future. The need for decisions are drive by anticipated Trigger Points
relating to management of defences and risk or in anticipation of natural coastal change.
Action Plan
The following actions are required in delivery of the Local CCAP
.
Action Description Notes  Timescale
Year (trigger)
Sandylands Promenade
1 Continue to maintain existing hard
defences
Secures defence over the short term,
allowing consideration of longer-term
options.
1 (20)
2 Highlight and raise awareness of short
to medium-term risk and support
preparation of option planning
Ensures continuity of management across
the wider area.
1 (20)
3 Raise awareness of very long-term
sustainability issues.
Maintain long-term awareness of possible
issues in relation to review of forward
planning
20 (100)
Stevenston Beach and transition
4 Ongoing discussion with Network Rail
and statutory stakeholders with
respect to transition area.
Determines further development of specific
coastal management options.
1 (5 to 10)
5 Undertake further development of
option(s) for transition area
Detailed option study 1 (5 to 10)
6 Undertake short term measures to
sustain slipway
Needs to be integrated with longer-term
options for management of transition. 
2 (5 to 10)
7 Ongoing monitoring of spoil heap, with
potential need for further investigations
Longer term planning of local options for
management of spoil heap. 
3 (15)
8 Develop and implement improved
access point associate with outfall. 
Improves access and management of the
change. Also exemplifies potential options
for general access management
1 (3)
9 Further discussion and development of
access management plan with
community.
Progresses development of overall access
plan, allowing opportunity for funding.
2 (5)
Broader Area
10 ongoing monitoring Allows review of trigger points and informs
decisions
ongoing
DRAFT
359

Page 360

Irvine Harbour to Gailes Burn
(Local CCAP 6c2.D)
Summary Document 
DRAFT
360

Page 361

Context
General description
The Local CCAP area includes two quite distinct areas covering Irvine Harbour, within and running
along the southern side of the Irvine/ Garnock Estuary and running out to the Harbour entrance
structures, and Irvine Beach extending through from the Harbour Pier to Gailes Burn. The total length
of the area is around 6km, with around 4.5km of that being the main open beach section.
The Harbour comprises a series of vertical quay walls, with property built to the quay at the upstream
end but, more generally, with a road running directly behind the quay with properties, car parks and
open ground further inland. North Ayrshire Council has aspirations to further enhance the Harbourside
area and have developed a Great Harbour Masterplan. The masterplan includes the development of
the maritime mile waterfront walkway and three activity hubs
Irvine beach area comprises a relatively wide sandy beach, stretching south towards Troon and is
largely backed by a dune system, although the form and behaviour of the dune and hinterland use
varies along its length. The northern section of the beach has a long industrial history, and most
obviously, the historic past is evidenced in this area by the massive spoil heap some 500m south of
the Harbour, with the toe of the mound now becoming exposed by erosion. Further south, where the
toe dune has been eroded there are further signs of the industrial heritage, with remnants of fencing
and local buildings now being exposed. Beyond this area the slightly more stable dune is backed by
golf courses with features of the golf course relatively close to the back of the dune.
Within the area of the open coast is the West Gailes SSSI, focussing on the dunes and extending
back across part of the golf courses. A further SSSI, the Bogside Flats SSSI, abuts the Harbour but
principally extends back to encompass the larger area of the Garnock Estuary.
The main northern area of Irvine Beach provides an extremely well-used open space with a high
amenity and reactional value, linked through to the important open space behind the Harbour and the
integrated use and appeal of the wider area.
The SMP context
The SMP (2018) defined the area within the general sub-
cell 6c2, with a further division of the wider area into four
SMP Policy Units. The Local CCAP area is contained
within SMP Policy Unit 6c2.3.
The general policy for this unit is for Holding the Line
(HTL) over the three epochs considered by the SMP.
However, there was an important caveat that, with
respect to Irvine Beach, the intent was to manage
erosion of the dunes using soft engineering approaches.
In reviewing the SMP, as apart of developing the Local
CCAP, the extent of this SMP Policy Unit should be
retained as:
• 6c2.D, covering Irvine Harbour to Gailes Burn.
However, this Local CCAP area is now considered as
two CCAP Policy Units: 6c2.D1 (Irvine Harbour) and
6c2.D2 (Irvine Beach) reflecting the local characteristics
of each local area.  
SMP Sub-cells and
Policy Units.
DRAFT
361

Page 362

Coastal Change
While the Harbour does to some extent constrain and fix the general curve of the Irvine channel.
Some slight pressure for bed erosion in this area may be expected, although there are no reports of
undermining to this area. Currently structures along the harbour and at the entrance have been
suitably maintained. While, in particular, the Harbour entrance structures do impose significant control
on the natural change at the mouth of the estuary, the maintaining structures are considered to be
sustainable.
Generally, there has been long-term persistent erosion along much of the open coast, with the dunes
remaining slightly more stable towards the West Gailes area. Typically, over the northern section,
recent erosion has been in the order of 0.4m/yr. This erosion has exposed the toe of the major Spoil
Heap which has been protected by gabion baskets which are now failing. An assessment of future
erosion distances is shown in the figure below.
Currently there is little direct flood risk across the area. With sea level rise, some areas will be at
increased potential risk, particularly in the area of the Harbour. This change is shown in comparing the
current and future (2100) relative land levels with respect to coastal water levels. 
Management Issues
• The potential risk to the use and regeneration of the Harbour area with sea level rise.
• The risk to the active travel routes and open space behind the dunes and further south to
potential users of the golf courses.
• The ongoing erosion and coastal change to the dunes and the increased pressure on the
dunes from excessive and ad hoc use of the dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination.
• The important landscape and natural environment of the area, specifically the ongoing
change to the West Gailes SSSI.
Indicative erosion over the open
coast in years 20, 50, 80 and 100.
Present day potential flood
risk
2100 potential flood risk
DRAFT
362

Page 363

Policy Update
The Local CCAP has sub-divided the coast into two policy units with the aim to provide better clarity in
considering CCAP policy. While these two units have very different characteristic and therefore
require different polices, the Units have been grouped under one Local CCAP to reflect and raise
awareness that there are significant inter dependencies, in relation to overall use and access along
the coast.
The intent of the Local CCAP is to maintain the use of the Harbour area sustaining the specific
character and regeneration opportunities. The CCAP raises the awareness of potential longer-term
increased flood risk with sea level rise, encouraging consideration of addressing this future risk in
developing detailed plans for the area. The physical trigger point for adaptation might not occur for 50
years. 
With respect to the open coast Unit, it is proposed that the CCAP policy is revised to one of Managed
Realignment better reflecting and clarifying the implications of the previous caveated policy set by the
SMP, with the intent to sustain as far as possible the natural development of the dunes. Over the
northern Irvine Beach this require development of an Access Management Plan. Underpinning this
Plan the intent to minimise intervention at the dune face. 
Over the critical spoil heap frontage, the final approach to management would need to be determined
based on further investigation of the nature of material contained within the spoil heap. The underlying
intent is to allow, as far as possible and permissible, the natural development at the shoreline.
However, this recognises that there may need to be hard engineering works. 
Further south, the overall aim is to allow the natural development and roll back of the dunes,
supporting the management intent set out in the SSSI designation. This recognises that there may,
therefore, be the need for some adaptation of the golf courses.
Local CCAP Policy Unit Short term
Policy
Longer term
Policy
Notes
6c2.D1-Irvine Harbour HTEL HTEL Consideration of long-term adaptation.
6c2.D2 Irvine Beach to
Gailes Burn 
MR MR Ongoing adaption to coastal change
with local intervention and management
plans.
The Local CCAP reinforces the need to consider mitigation measures discussed in the SMP.
• With respect to the Harbour, the Local CCAP recognises the need to address the increased
flood risk with sea level rise considering the potential impact on the landscape and use of the
area.
• Further investigation is required into the nature of material contained within the Spoil Heap
and the potential impact that ongoing erosion of the Spoil Heap would have on the marine
environment. This would be taken forward through development of the Local CCAP.
• Associated with the above, the Local CCAP identifies the need to consider and mitigate the
potential influence any management would have on sediment supply along the shoreline, with
particular reference the potential impacts on the West Gailes SSSI.
• More generally, the overall intent to allow ongoing natural development of the dunes would
maintain sediment supply along the frontage minimising the impact on the West Gailes SSSI.
• The Local CCAP recommends the development of specific management plans for adaptation
of the West Gailes area.
Furthermore, developing the Access Management Plan aims to balance the need to maintain
important and values use of the open coast alongside sustaining a healthy dune system.
DRAFT
363

Page 364

Critical Decisions
graphicalThe following Dynamic Adaptive Pathway diagram highlights where critical decisions will be
needed in developing the CCAP into the future. The need for decisions are drive by anticipated
Trigger Points relating to management of defences and risk or in anticipation of natural coastal
change.
Action Plan
The following actions are required in delivery of the Local CCAP
Action Description Notes Timescale
Year (trigger)
Irvine Harbour
1 Continue to maintain harbour defences Secures defence over the short to
medium term, allowing consideration
of longer-term options.
1 (50)
2 Highlight and raise awareness of longer-
term flood risk
Allows integration of potential future
risk withing current planning
1 (50)
Irvine Beach and Spoil Heap
3 Detailed investigation of potential
contamination
Determines further development of
specific coastal management options.
1 (5 to 10)
4 Develop options for coastal management
to Spoil Heap.
Detailed option study 3 (5 to 10)
5 Detailed development of access plan.
Working with partners to agree position of
access points and approach to ongoing
management
Needs to take account of access
management along spoil heap area.
3 (5)
Broader Area
6 Raise awareness of potential need for
adaptation to golf course frontages
Establish initial contact and discuss
how future planning may be
facilitated.
1 (20)
7 Ongoing monitoring Allows review of trigger points and
informs decisions
ongoing
DRAFT
364

Page 365

DRAFT
365

Page 366

366

Page 367

APPENDIX D 
367

Page 368

368

Page 369

APPENDIX E
369

Page 370

370