NORTH AYRSHIRE COUNCIL 
30 September 2025 
Cabinet
Title: Draft Local Coastal Change Adaptation Plans
Purpose: To update Cabinet on the completion of the draft Local Coastal
Change Adaptation Plans for ‘Sandylands Promenade &
Stevenston Beach’ and for ‘Irvine Harbour & Irvine Beach’ and to
seek approval for publication of the plans as the Council’s
preferred policy for coastal change adaptation at the two study
areas.  
Recommendation: That Cabinet:- 
a) notes the work carried out,
b) approves the content of the draft Local Coastal Change
Adaptation Plan for ‘Sandylands Promenade & Stevenston
Beach’ and for ‘Irvine Harbour and Irvine Beach’ and the
accompanying summary reports,
c) agrees to the publication of the draft Local Coastal Change
Adaptation Plans and accessible versions of the draft
summary reports as Council policy documents, 
d) agrees to receive further progress updates on the
implementation of the actions described in the draft Local
Coastal Change Adaptation Plans when appropriate, and 
e) notes the potential future funding requirements of actions
arising from future studies.   
1. Executive Summary 
1.1 The Ayrshire Shoreline Management Plan (‘the Ayrshire SMP’) was approved and
adopted by North Ayrshire Council and South Ayrshire Council in 2018. The Ayrshire
SMP is a large-scale assessment of the risks associated with coastal processes and
the plan helps to inform the management of these risks to people and to the developed,
historic and natural environment. It identifies the preferred shoreline management
policies and actions for 32 coastal policy units over the short (0-20 years), medium (20-
50 years) and long (50-100 years) term. 
1.2 Since the adoption of the Ayrshire SMP, the understanding of predicted coastal change
has improved with the publication of the second edition of the national-scale webmaps
by the Dynamic Coast project. Following the updated webmaps, guidance on the
development of Coastal Change Adaptation Plans was published by the Scottish
Government in February 2023. 
1.3 The local understanding of coastal change has also improved with the completion of
two coastal management studies at Stevenston and at Irvine in 2024. The Stevenston
study was commissioned to build on the community engagement that followed the
designation of Stevenston as a ‘Climate Action Town’ in 2021. The study at Irvine was

Page 2

an action arising from the Local Flood Risk Management Plan, which had subsequently
been approved by Cabinet on 24 September 2022. 
1.4 Given the improved national understanding of coastal change and the improved
understanding from the studies completed at Stevenston and Irvine, a funding award of
£99k by the Coastal Change Adaptation Programme to North Ayrshire Council has
been utilised to complete two draft Local Coastal Change Adaptation Plans (‘Local CCA
Plans’) for Stevenston and Irvine. These plans have been completed in accordance
with the 2023 Scottish Government guidance. Copies of the draft Local CCA Plans for
these locations and their accompanying summary reports are included in Appendices A
and B of this report. 
2. Background 
2.1 Between Skelmorlie in North Ayrshire and the Galloway Burn in South Ayrshire, the
Ayrshire Shoreline Management Plan identifies 19 separate policy units, 9 of which
include mainland coastal locations in North Ayrshire. The isle of Arran is covered by a
further 12 policy units while a single policy unit covers the isle of Great Cumbrae.
Smaller islands in the Firth of Clyde are not covered by the Ayrshire SMP. 
2.2 Each policy unit is further subdivided into management zones which recognise different
specific location characteristics or assets. 
2.3 Each of the completed draft Local CCA Plans for Stevenston and Irvine covers two
management zones within the policy units. The first draft Local Coastal Change
Adaptation Plan (Local CCA Plan) covers Sandylands Promenade (management zone
ref. 6c2-B1) and Stevenston Beach (management zone ref. 6c2–B2). The second draft
Local CCA Plan covers Irvine Harbour (management zone ref. 6c2–D1) and Irvine
Beach (management zone ref. 6c2–D2). 
Management Zone Policies 
2.4 In accordance with Scottish Government guidance on Coastal Change Adaptation
(published in February 2023), a short and long-term policy, an action plan, and the
triggers for future decision-making were identified for each of the four management
zones covered by draft CCA Plans (i.e. Sandylands Promenade, Stevenston Beach,
Irvine Harbour and Irvine Beach).   
2.5 The four policies that are available to shoreline managers are defined by national
guidance and are described below: 
• ‘Advance the existing defence line’, which allows new defences to be built on the
seaward side of the original defences;
• ‘Hold the existing defence line’, which allows maintenance and improvement of the
existing standard of protection;
• ‘Managed realignment’, which represents a policy of allowing the shoreline to move
backwards or forwards with management to control or limit movement; and
• ‘No active intervention’, whereby there is no investment in coastal defences or
operations and the shoreline is either allowed to remain in a natural state or to revert to
a natural state. 
2.6 The development of the draft CCA Plans included a scenario testing exercise by
specialist consultants to assess the predicted implications of each of the four possible
policies in order to select a preferred policy for each management zone. The draft
policies were informed by this scenario-testing exercise.

Page 3

Draft Sandylands Promenade and Stevenston Beach Local Coastal Change
Adaptation Plans (CCAP) 
2.7 Between Ardrossan and Stevenston, the earlier Ayrshire SMP identified a single policy
of ‘Holding the existing line’ over the short-, medium- and long-term. However, the
limitations of this broad scale policy are reflected in the developed action plan
contained in the Ayrshire SMP, which promotes the implementation of soft engineering
methods, such as vegetation restoration, to manage erosion locally at Stevenston
Beach. 
2.8 The draft Sandylands Promenade and Stevenston Beach Local CCA Plan has
identified a short- and long-term policy of ‘holding the existing line’ at Sandylands
Promenade and a short- and long-term policy of ‘managed realignment’ at Stevenston
Beach. 
2.9 The draft policies, including the change from ‘holding the existing line’’ to managed
realignment’ at Stevenston Beach remain consistent overall with the action plan
described in the Ayrshire SMP for the Ardrossan to Stevenston shoreline. However, at
a refined management zone level, the change at Stevenston Beach to managed
realignment will address impacts at a local level from erosion arising from, for example,
heightened recreational use. 
2.10 The study area, preferred shoreline management policies and the action plan in the
draft Sandylands Promenade and Stevenston Beach Local CCA Plan is provided in
Appendix D of this report. 
2.11 The coastal change adaptation issues identified by the draft Sandylands Promenade
and Stevenston Beach Local Coastal Change Adaptation Plan are as follows: 
• the required ongoing maintenance of the seawall at Sandylands Promenade;
• the predicted erosion risk to and around the Sandylands Promenade slipway;
• the predicted erosion risk to an area of colliery spoil at Stevenston Beach;  
• the benefits of managing access to reduce the impacts of the recreational use of the
beach; and
• the required continuation of coastal inspections that should be extended to include the
soft shoreline. 
Draft Coastal Adaptation Actions – Sandylands Promenade & Stevenston Beach 
2.12 At Stevenston, both the completed coastal management study and the draft Local CCA
Plan has identified the following early or ongoing coastal change adaptation actions: 
• the continued inspection and maintenance of the seawall at Sandylands Promenade, 
• a wave study to assess erosion pressures around the slipway at the end of Sandylands
promenade and an options appraisal to identify suitable erosion management
measures at the interface of the promenade seawall and the soft shoreline, 
• a site investigation to confirm the composition of the historic colliery spoil that could be
affected by coastal erosion, 
• access management measures to limit the erosion impacts from the recreational use of
Stevenston beach, this includes provision of a preferential path route to the beach area
which reflects stakeholder consultation, and a potential range of other measures such
as signage or fencing directing footfall access; and
• the requirement for the ongoing inspection and maintenance of the soft shoreline. 
Draft Irvine Harbour and Irvine Beach Local Coastal Change Adaptation Plans

Page 4

(CCAP) 
2.13 Between Irvine Bay and the Gailes Burn, the earlier Ayrshire SMP identified a single
policy of ‘Holding the existing line’ over the short-, medium- and long-term. However,
the limitations of this broad policy are reflected in the developed action plan contained
in the Ayrshire SMP, which recognises the importance of maintaining and improving the
defences locally at Irvine Harbour but promotes management of the natural dune
system on the beach. 
2.14 The draft Irvine Harbour and Irvine Beach Local CCAP has identified a short- and long-
term policy of ‘holding the existing line’ at Irvine Harbour and a short- and long-term
policy of ‘managed realignment’ at Irvine Beach. 
2.15 The draft policies, including the change from ‘holding the existing line’ to ‘managed
realignment’ at Irvine Beach remain overall consistent with the action plan described in
the Ayrshire SMP for the Irvine Bay to Gailes Burn shoreline. However, at a refined
management zone level, the change at Irvine Beach to managed realignment will
address risks arising from, for example, areas of contaminated soil. 
2.16 The study area, the preferred shoreline management policies and the action plan in the
draft Irvine Harbour and Irvine Beach Local CCA Plan is provided in Appendix E of this
report. 
2.17 The coastal change adaptation issues identified by the draft Irvine Harbour and Irvine
Beach Local Coastal Change Adaptation Plan are as follows: 
• the required ongoing maintenance of the coastal protection structures at Irvine Harbour;
• the predicted erosion risk to an area of suspected contaminated spoil at Irvine Beach;
• the benefits of managing access to reduce the impacts of the recreational use of the
beach; and
• the required continuation of coastal inspections that should be extended to include the
soft shoreline. 
Draft Coastal Adaptation Actions – Irvine Harbour & Irvine Beach 
2.18 At Irvine, both the completed coastal management study and the draft Local CCA Plan
have identified the following early or ongoing coastal adaptation actions: 
• the continued inspection and maintenance of the defences at Irvine Harbour, 
• a site investigation to confirm the composition of the historic industrial spoil that could
be affected by coastal erosion,  
• access management measures to limit the erosion impacts from the recreational use of
Irvine Beach and from the potential impacts associated with the implementation of the
Great Harbour masterplan, this could include similar range of measures to Stevenston
Beach but this requires to be determined by appraisal and subsequent consultation as
required; and. 
• the requirement for the ongoing inspection and maintenance of the soft shoreline. 
Funding 
2.19 North Ayrshire Council and South Ayrshire Council each secured funding of £99k from
the Coastal Change Adaptation Programme in 2024 to bring forward the planned
update of the Ayrshire SMP with a Coastal Change Adaptation Plan that would accord
with the recommendations of the 2023 guidance. The draft Local Coastal Change
Adaptation Plans at ‘Sandylands Promenade and Stevenston Beach’ and at ‘Irvine

Page 5

Harbour and Irvine Coast’ mark the start of this process and further work will be jointly
procured by North Ayrshire Council and South Ayrshire Council to extend the coastal
adaptation plan work as this budget allows. 
2.20 Funding of £200k has already been secured from the Coastal Change Adaptation
Programme and up to £50k has been committed by Network rail to help meet the early
actions identified in the draft Local CCA Plans. These actions are as follows: 
• to undertake repair works to the Sandylands slipway and to commission a further study
to help identify how best to adapt to the erosion risk at the east end of Sandylands
Promenade,
• to investigate the suspected contamination at Stevenston beach and at Irvine beach,
and
• to begin improving access to Stevenston Beach by upgrading an existing informal path. 
2.21 The Irvine Harbour defences and part of the Sandylands Promenade seawall are
already regularly inspected by North Ayrshire Council and this arrangement shall
continue to be funded from existing Council revenue budgets. The additional
requirement to inspect and maintain the soft shoreline within Council owned land shall
also be met through existing revenue budgets.   
3. Proposals 
3.1 It is proposed that Cabinet: 
(a) notes the work carried out to date;
(b) approves the draft Local Coastal Change Adaptation Plans and the accompanying
summary reports;
(c) agrees to publish the draft Local Coastal Change Adaptation Plans and accessible
versions of the summary reports as Council policy documents;
(d) agrees to receive further progress updates on the implementation of the draft Local
Coastal Change Adaptation Plans when appropriate; and
(e) notes the potential future funding requirements of actions arising from future studies. 
4. Implications/Socio-economic Duty
Financial
4.1 The development of an Ayrshire-wide Coastal Change Adaptation Plan and a number
of the early actions identified in the draft Local CCA Plans has already secured external
funding as stated in the report. 
4.2 Significant repair or improvement work or the construction of any new coast protection
assets at either Stevenston or Irvine shorelines or any other significant repair or
improvement work to coast protection assets, including soft shorelines, would require
funding to be secured from Council’s general capital budget or central government
funding should it become available for formal coastal protection schemes.   
Human Resources 
4.3 The required inspection, repair and improvement of the soft shoreline would place
additional pressures on the Council’s flooding and structures inspectors. This impact
would be manged by additional training on the inspection of flood assets. 
Legal

Page 6

4.4 The draft Coastal Change Adaptation Plans will help the Council, as coast protection
authority, to exercise the powers and duties conferred or imposed by the Coast
Protection Act 1949 and would also help to meet the Council’s landowner
responsibilities. 
Equality/Socio-economic 
4.5 The draft Coastal Change Adaptation Plans rely on the Strategic Environmental
Assessment (SEA) and the Habitats Regulation Assessment (HRA) that were
undertaken to support the development of the Ayrshire Shoreline Management Plan.
Other appropriate assessments will be undertaken as required during the
implementation of the draft action plans to assess the sustainability of the any proposed
measure and to avoid, reduce or minimise any impacts on people and the environment. 
Climate Change and Carbon 
4.6 The draft Local Coastal Change Adaptation Plans help the Council, as landowner, to
adapt to the predicted erosion impacts that are driven by climate change and sea-level
rise. 
Key Priorities 
4.7 The completed Local Coastal Change Adaptation Plans and the implementation of the
actions described in the plans shall contribute to the following key priorities of the
Council, which are to: 
• ensure our places and spaces where we live, work and visit are well maintained and
accessible;
• Improve communities’ preparedness to deal with the impacts of climate change already
locked-in;
• Take a nature-based approach to protect our habitats and species.
• Use dynamic data and lived experiences to inform decision-making. 
Community Wealth Building 
4.8 The procurement of services shall seek to use existing Council framework contracts
that attract community benefits. 
4.9 The maintenance of safe shoreline habitats promotes accessibility and encourages
tourism to enhance local businesses and amenities. 
Islands Communities Impact Assessment (ICIA) 
4.10 None. 
United Nations Rights of the Child (UNCRC) 
4.11 None. 
Consumer Duty 
4.12 None.

Page 7

5. Consultation 
5.1 The draft Coastal Change Adaptation Plans build on and summarise the outcomes of
the completed coastal management studies, which were guided by targeted
consultations in March 2024 and July 2024. A public in-person and online consultation
on beach management at Stevenston and at Irvine was held in September 2024. There
were 18 responses received in response to the public consultation about the
management of Stevenston beach and 24 responses were received in response to the
public consultation about the management of Irvine beach. These consultation
responses helped to inform the actions, for example on improved Stevenston beach
access route.   
5.2 Further consultations will be carried out as part of the development of future adaptation
actions. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Marc Miller, Team Leader (Flooding),
on 01294 317285 
Background Papers
0

Page 8

No embedded text on this page.

Page 9

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 ii 
HASKONINGDHV UK LTD.
2nd Floor One Strawberry Lane
Newcastle
NE1 4BX
United Kingdom
Water & Maritime
VAT registration number: 792428892
Phone: +44 191 2111300
Email: info@uk.rhdhv.com
Website: royalhaskoningdhv.com
Document title: North Ayrshire Coastal Change Adaptation Plan
Subtitle: Stevenston and Irvine Beach Frontages
Reference: PC5329-RHD-XX-XX-RP-X-1001
Your reference Click or tap here to enter text.
Status: Final/1
Date: 4 April 2025
Project name: North Ayrshire CCAP
Project number: PC5329
Author(s): 
Drafted by: 
Checked by: 
Date: 03/04/2025
Approved by: 
Date: 04/04/2025
Classification: Project related 
Unless otherwise agreed with the Client, no part of this document may be reproduced or made public or used for any
purpose other than that for which the document was produced. HaskoningDHV UK Ltd. accepts no responsibility or
liability whatsoever for this document other than towards the Client. 
Please note: this document contains personal data of employees of HaskoningDHV UK Ltd.. Before publication or any
other way of disclosing, this report needs to be anonymized, unless anonymisation of this document is prohibited by
legislation.

Page 10

No embedded text on this page.

Page 11

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 iv 
Table of Contents
1 Approach to development of the North Ayrshire CCAP 1
1.1 Concept and Principles 2
1.1.1 Core Principles 2
1.1.2 Key Objectives 2
1.2 Delivery 2
1.2.1 Stage 1 2
1.2.2 Stage 2 3
1.2.3 Application to the North Ayrshire Coastline. 4
1.3 Communication 4
1.4 Environmental Assessment 4
1.5 Context for division of coastline 5
1.5.1 Ayrshire Shoreline Management Plan 5
1.5.2 Revised approach in developing local CCAPs. 6
1.6 Ongoing Process of Management 8
2 Local Coastal Change Adaptation Plan 6c2.B 9
2.1 General Characterisation 10
2.1.1 Key Issues and Objectives. 13
2.1.2 Previous studies and current policy 13
2.2 Physical Baseline 15
2.2.1 Coastal Form and Geomorphology 15
2.2.2 Tide and water levels 16
2.2.3 Wave Climate 17
2.2.4 Sediment Transport 17
2.2.5 Primary Control Features 18
2.2.6 Coastal Change 19
2.2.7 Flooding 21
2.3 Discussion of Management 23
2.3.1 General 23
2.3.2 6c2.B1 - Sandylands Promenade 25
2.3.2.1 Initial Screening of Coastal Change Adaptation Policies 25
2.3.2.2 Consultation 27
2.3.3 6c2.B2 - Stevenston Beach 28
2.3.3.1 Initial Screening of Coastal Change Adaptation Policies 28
2.3.3.2 Consultation 30
2.4 Summary of Local CCAP 32
2.4.1 Coastal Change Adaptation and Action Plan 33
2.4.1.1 Dynamic Adaptive Pathway 33
2.4.1.2 Action Plan 35

Page 12

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 v 
3 Local Coastal Change Management Plan 6c2.D 36
3.1 General Characterisation 37
3.1.1 Key Issues and Objectives 39
3.1.2 Previous studies and current policy 40
3.2 Physical Baseline 42
3.2.1 Coastal Form and Geomorphology 42
3.2.2 Tide and water levels 43
3.2.3 Wave Climate 44
3.2.4 Sediment Transport 45
3.2.5 Primary Control Features 46
3.2.6 Flooding 48
3.3 Discussion of Management 50
3.3.1 General 50
3.3.2 6c2.D1 - Irvine Harbour 52
3.3.2.1 Initial Screening of Coastal Change Adaptation Policies 52
3.3.2.2 Consultation 53
3.3.3 6c2.D2 - Irvine Beach to Gailes Burn 54
3.3.3.1 Initial Screening of Coastal Change Adaptation Policies 54
3.3.3.2 Consultation 56
3.4 Summary of Local CCAP 57
3.4.1 Coastal Change Adaptation and Action Plan 58
3.4.1.1 Dynamic Adaptive Pathway 58
3.4.1.2 Action Plan 60
Table of Tables
Table 1-1: Ayrshire SMP Sub-cell 6c2 Policy 6
Table 1-2: CCAP Management Zones 7
Table 2-1: Water levels (baseline 2024) with change in water levels with sea level rise based on
UKCP18 RCP8.5 95%’ile. 16
Table 2-2: Nearshore wave climate 17
Table 2-3: Policy Assessment - 6c2.B1-Sandylands Promenade 26
Table 2-4: Policy Assessment - 6c2.B2 Stevenston Beach 30
Table 2-5: Summary of high level CCAP policies 32
Table 2-6: Local CCAP Action Plan 35
Table 3-1: Water levels (baseline 2024) with change in water levels with sea level rise based on
UKCP18 RCP8.5 95%’ile. 44
Table 3-2: Irvine wave climate. 44
Table 3-3: Projected rates of sea level rise. 47
Table 3-4: Policy Assessment - 6c2.D1 - Irvine Harbour 53
Table 3-5: Policy Assessment - 6c2.D2 Irvine Beach to Gailes Burn 55

Page 13

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 vi 
Table 3-6: Summary of high level CCAP policies 57
Table 3-7: Local CCAP Action Plan 60 
Table of Figures
Figure 1-1: SMP sub-division of the coast. 5
Figure 2-1: CCAP 6c2.B Location Plan. 10
Figure 2-2: SSSI designated area. 11
Figure 2-3: Stevenston Beach LNR. 12
Figure 2-4: Projections of erosion from Dynamic Coast. 15
Figure 2-5: Projections of erosion from Dynamic Coast. 17
Figure 2-6: Longshore wave energy. 18
Figure 2-7: Projections of erosion east (over 20, 50, 80 and 100 years). 20
Figure 2-8: Projections of erosion west (over 20, 50, 80 and 100 years). The inset shows the
projected erosion at the transition). 20
Figure 2-9: Present day direct flood risk. 21
Figure 2-10: Future Flood Risk 22
Figure 2-11: Dynamic Adaptive Pathway 34
Figure 3-1: CCAP 6c2D Location Plan 37
Figure 3-2: Current active use based Strava's Global Heatmap. 38
Figure 3-3: Designated sites. 39
Figure 3-4: General geomorphology covering the wider area. 42
Figure 3-5: Wave Climate. 44
Figure 3-6: Longshore wave energy. 45
Figure 3-7: projected future erosion distances. 47
Figure 3-8: Present day direct flood risk. 48
Figure 3-9: Future Flood Risk 49
Figure 3-10: Dynamic Adaptive Pathway. 59 
Appendices
Provided under separate cover.

Page 14

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 1 
Preface
North Ayrshire Council (NAC) has appointed Royal HaskoningDHV (RHDHV) to assist in developing their
approach to Coastal Change Adaptation Plans (CCAP) for the North Ayrshire coastline. 
The North Ayrshire coastline is approximately 150km in length, including around 50km associated with the
mainland and a further 100km of shoreline associated with the two main islands of Great Cumbrae and
Arran. While the shoreline comprises long lengths of natural cliffs and dunes there are also significant
lengths protected by manmade defences to important towns such as Skelmorlie, Largs, Fairlie, Ardrossan,
Saltcoats, Stevenston and Irvine on the mainland and Millport, Brodick, Lamlash and Whiting Bay on the
islands. In addition, there are numerous smaller villages, ports and harbours, together with important
transport routes, all set within an area of important natural landscape and significant ecological value. 
The coastline, therefore, presents a complex challenge for coastal and shoreline management that must
take account of the significant detailed local needs alongside the need to consider important interactions
across a much broader area. 
North Ayrshire Council wish to ensure that in developing their CCAP, that the CCAP covering any specific
area captures both this local complexity of issues alongside understanding how critical areas interact.   
At present the North Ayrshire coastline is covered by the Ayrshire Shoreline Management Plan (SMP),
developed in 2018. The SMP sets out policy for coastal risk management over the North & South Ayrshire
coastline. In addition to this there have been significant studies undertaken of specific local areas. The
approach taken to the development of the CCAP aims to build upon the work already undertaken,
maintain continuity in management, and consolidate previous information, in line with the recent guidance
from Scottish Government (2023) on the development of CCAPs. 
The overall approach is described in more detail in Section 1 of this Report but in essence aims to develop
local area CCAPs, drawing on existing information but including more recent local studies, building this
together in a consistent manner to create a CCAP over the whole coastline. 
Within the context of the overall approach, this report focusses on two specific areas, where detailed
studies have been undertaken: 
• Saltcoats to Stevenston Point
• Irvine Harbour to Gailes 
The opportunity has been taken to slightly broaden the geographic scope beyond the immediate areas of
study to provide further context for management; but still building this on the initial sub-division of the
coast presented in the SMP, as discussed in Section 1. 
In this way the local detailed studies have formed the basis of the local CCAPs developed for each area,
ensuing that the local CCAPs still capture the necessary broader understanding of coastal issues. It is
intended that an overall CCAP will be developed by NAC, in discussion with key stakeholders, to cover the
full North Ayrshire coastline. The initial local CCAPs (Section 2 and 3 of this report) are effectively
produced as stand-alone documents, set out in a format that can be adopted for the wider area. 
Specific Studies
The initial scope of the two specific study areas included:

Page 15

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 2 
1. The identification of suitable and implementable soft engineering methods to manage coastal
erosion at Stevenston Beach; in line with the adopted Ayrshire SMP.
2. A Natural Flood Risk Management study to identify suitable and implementable erosion
management for the dune system at Irvine Beach, in line with the adopted Ayrshire Shoreline
Management Plan (SMP). 
3. The identification and outline design of suitable measures to improve, manage and safeguard
beach access, given the deterioration of an existing footbridge over the Stevenston Burn.
4. The identification and outline design of suitable measures to improve, manage and safeguard
beach access at Irvine Beach, given the anticipated pressures on Irvine Beach from the effects of
North Ayrshire Council’s Great Harbour Masterplan. 
The initial scoping studies were then developed further into Outline Option Appraisal reports for the two
areas which identified and prioritised options considered under item 1 and 3 above. 
The scoping reports were informed by site walkovers, outputs from the Scottish Government’s Dynamic
Coast Project, the existing and predicted physical constraints of the site and working group and public
consultations. In line with the recent national guidance on Coastal Change Adaptation Plans (CCAPs),
further consideration was given to the natural evolution of the coast, examining the potential timescales of
change. This refined the work taken of the Dynamic Coast Project, which was updated based on detailed
Lidar survey data (Phase 1 - 2010 and Phase 6 – 2022). As well as coastal change predictions over the
wider study areas, the reports specifically look at the influence of existing defences, address concerns
raised during consultations and consider potential changes outside of the study areas. 
The reports go on to consider options for management within each of the Zones identified in the scoping
reports, considering aspects such as management of footfall and access to the beaches, alongside the
uncertainty associated with the potential need for ongoing management of areas of spoil which exist in
both study areas. This approach to management is informed by a refined assessment of future change.
The reports conclude with a summary and consideration of factors affecting decision pathways in the
future. 
The reports are reproduced under separate cover as Appendix 2A and Appendix 3A in support of the
higher level CCAP assessment provided within Sections 2 (Steveston Beach) and 3 (Irvine Beach)
respectively, with information being summarised within each section of this report.

Page 16

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 1 
1 Approach to development of the North Ayrshire CCAP
Scottish Government produced interim guidance (SG2023) for development of Coastal Change
Adaptation Plans (CCAP) in February 2023. In providing this guidance it had been recognised that
different areas of the Scottish Coastline exhibit very different challenges and that different local authorities
have different levels of understanding of their issues. 
The guidance, therefore, does not prescribe exactly how local authorities should develop their CCAPs.
Instead, it intends to provide guidance as to what they should seek to achieve and how it might be
delivered. Indeed, to a degree, the guidance aims to allow and encourage individual authorities to explore
how best, in their areas, the CCAPs should be taken forward. The Scottish Government will seek
feedback from local authorities on the guidance and aims to monitor its efficacy in securing sustainable
outcomes in respect of coastal management. The intention is that the guidance will be revised, reviewed,
and refined based on user feedback and as the evidence evolves. 
The guidance specifically notes:
• “Coastal processes do not conform to administrative boundaries and neither do many
infrastructure assets and communities. It is essential therefore that CCAPs are progressed in a
way that reflects coastal processes systems and not administrative boundaries.” Furthermore,
that, “one size does not fit all, and this guidance recognises the need to maintain flexibility for
appropriate local and regional CCAP delivery structures to emerge.” 
Notwithstanding this element of exploration, the guidance provides a strong framework within which local
authorities are expected to operate. 
The SG2023 does, however, note that several Shoreline Management Plans have already been published
in Scotland over the last 20 years. The majority of these follow the Shoreline Management Plan Guidance
produced for England and Wales (DEFRA, 2006) and therefore, much of the groundwork for CCAPs has
already been done in these areas. 
This is the case for North Ayrshire. As such the opportunity is being taken, through the development of the
North Ayrshire CCAP, to review, provide greater clarity and in some areas revise the SMP. This
recognises that in several areas, covered by the SMP, more local detailed studies have been undertaken
and that there is the need to capture this new information. 
As discussed later in Section 1.5, as far as possible, the structure and way in which the coast has been
divided and described within the SMP has been maintained. This aims to provide a degree of continuity
between the SMP and the CCAP. 
As part of developing the CCAP, there is the need to consider the specific nature of the North Ayrshire
coastline, covering a length of some 150km of shoreline, including areas of the mainland alongside the
principal islands of Great Cumbrae and Arran. Within this length of coast, there is large variation in the
coastal character. In some areas such as the major towns there are significant lengths of man-made
protection. In many other areas there are small settlements alongside many small ports and local
harbours, all set within broader areas of natural shoreline. 
There is, therefore, a clear need to adapt the level of detail provided by the CCAP to reflect the local
nature of the coastline in any location and to maintain relevance to future management of specific areas.
Given the initial background and structure provided by the SMP in identifying the broader

Page 17

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 2 
interdependencies throughout the area, this provides the opportunity to focus in more detail on individual
areas. 
To this end, the approach being taken to the development of the CCAP process is to develop a series of
local CCAPs. It is recognised that this process will be ongoing but it does also allow focus on areas where
further information and study has been carried out. The intent is to develop these local CCAPs in a
consistent format around the whole coastline, ultimately allowing collation of these local CCAPs as one
CCAP for North Ayrshire. 
The local CCAPs are developed based on the underlying concept and principles set out in the SG2023. 
1.1 Concept and Principles
1.1.1 Core Principles
The overall the aims of the CCAP are:
• to create a vision for well-adapted and resilient management, properly integrated into other
policies by taking a more land use planning approach, avoiding locking-in future generations to
unsustainable actions, considering that sea levels are expected to continue to rise well beyond the
end of this century;
• to seek opportunities to support and regenerate communities and address inequalities. In
particular, policy should anticipate that changes to property protection and property values will
increasingly come into focus as adaptation pathways are developed; and
• to deliver multiple benefits (for example economic, environmental or amenity enhancements), and
to promote sustainable infrastructure and work to preserve natural features and ecosystems.
1.1.2 Key Objectives
In line with the core principles the following overall objectives of the CCAP are: 
• To promote the resilience of our natural coastline and begin the process of adaptation to climate
change;
• To set out a process for a proactive approach to coastal adaptation planning that will maximise
opportunities and minimise risk from climate change impacts;
• To ensure our collective coastal adaptation journey starts now; and
• To support local authorities to begin the process.
1.2 Delivery
The SG2023 suggests that the CCAP development process might typically be undertake in two stages.
This suggested process, as described in the SG2023, is set out below. 
1.2.1 Stage 1
CCAPs are expected to provide within Stage 1:
• A solid understanding of the overall coastal processes, looking both at the more immediate
aspects of risk of coastal erosion and associated flooding as well as looking longer term at the
potential risks and pressures that may occur or develop. 
• An initial assessment of policies for management of risk, defining these in term of three headline
policies:
o Hold the Existing Line (HTEL)
o Managed Realignment (MR)

Page 18

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 3 
o No Active intervention (NAI) 
The guidance suggests that Stage 1 should broadly follow the process provided by the Defra 2006
Guidance for Shoreline Management Plans. However, SG2023 emphasises key modifications to Defra
2006, both in attitude and practice. In relation to this, the SG2023 specifically notes that: 
• “The traditional approach to shoreline management planning whereby a draft plan is produced
and put out for consultation at a relatively late stage in the process, is not appropriate for the
conversations that we need to have about future coastal change. The most sustainable solutions
come from involving many perspectives and insights at an early stage.”
• “Whilst artificial structures will continue to play a valuable role in the protection of people, property
and assets at the shoreline, there needs to be acceptance of their limitations under the current
sea level rise projections. Within future coastal change adaptation planning there should be a
general presumption against installing new artificial structures. Consideration should be given to
the wisdom of maintaining existing structures especially when they reach the end of their design
life.”
• Taking a place-based approach involves dealing with complexity and considering all the physical,
social, and economic elements of a place collectively. Working in a place-based way can identify
key relationships and solve problems that cannot be solved incrementally or by one person or
organisation acting alone.” “….the different arrangements for coastal management in
Scotland…allows local authorities to widen the scope of strategic planning beyond the ‘shoreline’
to include the coastal hinterland and allow planning space for relocation adaptation.”
• “Whereas Defra’s SMP guidance for England and Wales requires working with defined periods of
short term (up to 20 years), medium term (20 to 50 years) and long term (50 to 100 years), for
Scotland the preferred policies should be assigned only to the short term (present) and the long
term (where we want to be before the end of the appraisal period).” 
Stage 1, therefore, aims to define “where we are now” and, from this, taking a longer term broader
perspective, identifying “what are the challenges and where there is need or opportunity for change”.
1.2.2 Stage 2
Stage 2 aims to translate high level policy choices, made during Stage 1, into deliverable Adaptation
Plans. The Scottish Government wants to ensure adaptation actions are forecast and planned for in good
time. Stage 1 identifies where there is the opportunity or need for change, whether this is with respect to:
• on-going coastal change as a result of policies of NAI or MR
• areas where there is change in policy intent (i.e. moving from HTEL or MR to MR or NAI)
• or indeed where there are opportunities to change (modify) the approach taken to HTEL, allowing
a more sustainable approach to sustaining protection. 
Stage 2 considers how such change might be achieved and managed. This starts from identifying what
and when actions need to be put in place. This has to consider what is driving the need for change
“Change Points” or “Physical Triggers,” basically setting the anticipated timescale for change. Alongside
this, consideration has to be given to what actions need to have been put in place to allow change to
occur or where further information may be required to allow future decisions to be made. 
Dynamic Adaptation Pathways – the delivery plan.
The CCAP (based on the Dynamic Adaptation Pathway) should be framed by the physical triggers but
must be flexible enough to allow modification to the pathway to allow adaptation to occur, taking account
of new information emerging over time. Such new information may allow more time for adaptation but may
also indicate the need to accelerate the rate of adaptive change.

Page 19

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 4 
1.2.3 Application to the North Ayrshire Coastline.
As noted earlier, some detailed local studies have already been undertaken in North Ayrshire. In effect
already having delivered both stages recommended by the guidance (i.e. building from the initial
assessment provided by the SMP and developing this through to a more detailed plan for ongoing
management). 
In developing specific local area CCAPs, the aim would be to capture this new information and as
necessary, reassess the conclusions of any study against the principles set out in the guidance. Essential
to this approach is the need to recognise that coastal management is an ongoing process. The
development of the local CCAPs provides the opportunity to review current management practice, while
still maintaining a continuity of management, particularly in relation to discussion with stakeholders. 
In essence, under this local CCAP approach:
• Where there are already more detailed studies and management plans in place, these will be
reviewed, with the local CCAP being developed retrospectively but ensuring compliance with the
principles and objectives set out in SG2023.
• Where further studies and management plans are being developed, these studies would include
consideration of the wider longer-term issues highlighted by the SG2023 guidance and associated
with each study a local CCAP would be developed.
• In other areas, initially, policy for management would be defined by the current SMP, with the
intent to develop a basic level local CCAP eventually replacing the guidance currently provided by
the SMP. 
This current report sets out a framework within which this process will be developed, with local CCAPs
being developed for the two areas of Steveston and Irvine Beach and Harbour. The structure and format
for the local CCAPs is as set out in Sections 2 and 3 of this report for these two specific areas.
1.3 Communication
Throughout this process, as emphasised by the CCAP guidance there needs to be a focus on good
communication and engagement as a central pillar of the CCAP process. As set out in the guidance: 
• “CCAPs are not something that should be done ‘to’ communities, rather they should be
developed, reviewed, communicated, and updated in a long-term partnership between
practitioners, residents, and businesses.”
• “The conversations that CCAPs will generate will get more difficult as sea level rises, yet
communication charged by emotion often leads to misunderstanding and distrust. Communities
need planning bodies and regulators to provide clear signals and long-term messaging on sea
level rise and coastal change. Therefore, it is important to develop a communications and
engagement plan early in the CCAP process and that it remains an integral part of the CCAP. 
This reinforces the shift towards long term planning and management which is engendered by the
process, reinforcing the concept of a dynamic approach to development and maintenance of the Plan both
as challenges become more evident and as new information emerges.
1.4 Environmental Assessment
Integral to the development of the SMP was the development of a Strategic Environmental Assessment
(SEA) and Habitats Regulations Assessment (HRA). It is considered appropriate to carry these important
assessments forward, in particular in ensuring that issues identified by the SEA & HRA are incorporated

Page 20

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 5 
into the general development of local studies. As part of developing the local CCAPs, the SEA and HRA
have been reviewed and where appropriate additional information on the broader scale environment is
considered. 
1.5 Context for division of coastline
Essential to the approach in developing local CCAPs is ensuring that for each area there is the correct
balance between capturing relevant local detail while equally ensuring that the larger interactions across
the shoreline are recognised. This is discussed below.
1.5.1 Ayrshire Shoreline Management Plan
The administrative boundaries of the Ayrshire Shoreline Management Plan (SMP) (RPS, 2018) extend
from the northern boundary of the North Ayrshire Council area to the southern boundary of the South
Ayrshire Council area. This is approximately from the town of Skelmorlie to the outlet of the Galloway Burn
on the north-eastern edge of Loch Ryan. The islands of Great Cumbrae and Arran are also included within
the scope of the Ayrshire SMP, whilst other smaller offshore islands are excluded due to the low number
of assets present. 
In order to facilitate the development and presentation of appropriate shoreline management policies for
the Ayrshire coastline it was considered essential to sub-divide the full extent of the Ayrshire coastline into
a larger number of smaller geographic sections. 
The North Ayrshire frontage was subdivided into nine coastal sub-
cells relating to sediment supply and transport; 6b1, 6b2, 6c1, 6c2
(located on the mainland), A1, A2, A3 and A4 (covering the island
of Arran) and a singular sub-cell for the island of Great Cumbrae as
shown in Figure 1.1. 
The Ayrshire SMP provides sustainable shoreline management
policies for the Ayrshire frontage across three epochs. Namely;   
• Short term (0 to 20 years)
• Medium term (20-50 years) 
• Long term (50-100 years). 
Four high level Shoreline Management Policies are available to
shoreline managers: 
• Advance the existing defence line.
• Hold the existing defence line.
• Managed realignment
• No active intervention
Figure 1-1: SMP sub-division of the coast. 
The SMP in developing policy further sub-divided the shoreline into Policy Units. In relation to coastal sub-
cell 6c2 the sub-cell is divided into four policy units: 
• 6c2.1 Ardrossan to Stevenston
• 6c2.2 Stevenston to Irvine Bay

Page 21

No embedded text on this page.

Page 22

No embedded text on this page.

Page 23

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 8 
Table 1-2 briefly sets out the rational for these sub-divisions and highlights the two areas where Local
CCAPs have been developed as discussed in Section 2 (Stevenston Promenade and Beach) and Section
3 (Irvine Harbour to Gailes Burn). 
1.6 Ongoing Process of Management
The two Local CCAPs are developed from the background of the two Coastal Management Studies
recently undertaken (provided under separate cover as Appendix 2A and 3A). These studies focussed on
Policy Unit 6c2.B2 (Stevenston Beach) and Policy Unit 6c2.D2 (Irvine Beach). 
In developing the two Local CCAPs in a coherent manner, consideration has also been given to Policy
Unit 6c2.B1 (Sandylands Promenade) and Policy Unit 6c2. (Irvine Harbour). While there is less detail
available on these associated areas, a similar CCAP assessment process has been able to be carried out. 
The intent of the current report is to set out a framework within which Local CCAPs may be prioritised and
developed for other area of the North Ayrshire coast, in discussion with stakeholders.

Page 24

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 9 
2 Local Coastal Change Adaptation Plan 6c2.B
Sandylands Promenade and Stevenston Beach
The development of the Local CCAP is set out with an initial discussion and description of the larger
CCAP area and subsequent discussion of management of the two specific policy unit areas. The final
section brings this together in summarising the intent of the Local CCAP. 
Overall Plan area: 
• General Characterisation: 
o Description, 
o Identification of key features, issues and objectives,
o Previous studies and current management policy.
• Physical Baseline:
o Geomorphology, 
o Tide and water levels and sea level rise,
o Wave climate,
o Sediment transport and control features,
o Coastal change and flood risk. 
Discussion of Management:
• General discussion over the wider area,
• Local Area (CCAP Policy Unit) assessment;
o Initial Screening of Policy Options,
o Consultation. 
Summary of Overall Plan
• Overall intent of management,
• Policy Summary,
• Coastal Change Adaptation and Action Plan;
o Dynamic Adaptative Pathway,
o Action Plan. 
A detailed study (Stevenston Beach Coastal Study – RHDHV 2025) of the Stevenston Beach has recently
been undertaken, providing more local detail and making specific recommendations for management. This
Local CCAP 6c2.B draws strongly on this study, aiming the capture the higher level issues, providing the
more strategic context in line with the SG2023 guidance. 
This report is provided (under separate cover) as Appendix 2A to this CCAP assessment.

Page 25

No embedded text on this page.

Page 26

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 11 
Between Stevenston Burn and the Sandylands Promenade, the dunes are punctuated with an area of coal
mining spoil from the historic Auchenharvie Colliery No. 5 pit. With progressive erosion of the dune, the
spoil heap has become increasingly exposed at the dune face and now forms a slight headland holding
this western section of dunes forward of the natural alignment of the shoreline to the east. 
There has also been significant ongoing change in the area of the Stevenston Burn with general erosion of
the dune spit to the west of the Burn and substantial change of the alignment of the Burn over the
foreshore, impacting on the behaviour of the shoreline to the east. 
Social and Built Environment
The most obviously significant infrastructure directly associated with the coast area is the regionally
important railway line, this provides a critical part of the public transport network, linking through to
Ardrossan and Largs and the ferry links to Great Cumbrae and the Isle of Arran. This vital link is clearly at
risk from coastal change should the defence to the railway not be maintained or if there was longer term
erosion of the dunes. 
At a more local level, there are areas of industrial and commercial use immediately behind the railway,
together with important local road links and a major caravan park, all within the lower lying hinterland. 
While property within the towns of Saltcoats and Steveston have been subject to flooding on more
extreme events such as Strom Eowyn (January 2025), over the longer term there is an increasing
potential risk of coastal flooding associated with sea level rise. 
The whole coastal strip is also a highly valued and well used active travel route, linking from Stevenston to
Largs, both through the dunes and along the promenade. The Stevenston dunes, the open ground behind
the dunes and the foreshore and beach are considered to be an essential open space for recreation and
amenity. Currently there are community facilities, and a well-used car park situated immediately behind
the dunes, which supports and expands the use of the area beyond that of residents of Stevenston,
highlighting the importance of the area across the wider North Ayrshire area. 
Notwithstanding the important amenity value of the area, ad hoc pedestrian trampling, particularly through
the dunes, threatens both the ecological function and physical integrity and resilience of the dunes to
coastal change. In discussion with local residents and users of the area, undertaken as part of the
Stevenston Beach Coastal Study, key features of value include: the access via the slipway at the eastern
of the Promenade, the local headland formed by the spoil heap and the access to and use of the beach to
the east of the Steveston Burn. More generally, the connectivity along the whole Stevenson Beach for
both walking and horse riding has been identified as being a critical feature of the area.     
Natural and Historic Environment
To the north of the CCAP area is the Ardrossan to Saltcoats Coast Site
of Special Scientific Interest (SSSI) and Geological Conservation
Review (GCR) site. This SSSI is notified for its Carboniferous-Permian
Igneous Geological feature. 
This site was discussed in the SEA developed as part of the SMP
development process. 
Figure 2-2: SSSI designated area.

Page 27

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 12 
The SEA concluded that, no impacts are expected on this SSSI from the proposed shoreline management
measures owing to a lack of any identifiable impact pathway. This has been reviewed in developing the
Local CCAP and confirmed. 
More locally the Stevenston Beach area is designated both as Local Nature Reserve (LNR) and Local
Nature Conservation Site (LNCS). The area defined as the LNR is shown in Figure 2-3 (the image is taken
from Stevenston Beach Local Nature Reserve Management Plan 2018) covering the western area of
dunes. There is an ambition to extend this area to cover the full extent of the LNCS, extending the
boundary over the eastern area of dunes and the Stevenston Point. 
The Stevenston Beach Local Nature Reserve Management Plan 2018 identifies a range of different
habitats and features, including: Dune slack, dune heath, fixed and mobile dunes that are all regarded as
priorities under the European Habitats Directive. 
The Plan notes that, given the scarcity of sand dune habitat in
southwest Scotland makes the LNR particularly Important. The
reserve is particularly unusual in that it supports a succession
of most types of dune formation - from embryo dunes to mobile
foredunes to fixed dunes and dune slack – stretching over
200m inland.
Figure 2-3: Stevenston Beach LNR. 
Key threats to the reserve are identified as being:
• from coastal erosion; although there is a recognition that, in addressing this, this should not
constrain natural development of the area. 
• from pedestrian trampling. The key access points to the area are shown on the image in Figure
2-3, although it should be noted that the bridge over the railway line between the Caravan Park
and the dunes has now been closed and that forward bridge access point 6 is no longer available
due to change in the position of the Stevenston Burn. 
While the area has an important industrial heritage, including both Steveston Point and the spoil heap,
there are no specific built heritage features considered to be at risk from coastal change. 
The Environmental Report, developed from the SEA and HRA as part of the SMP process did highlight the
presence of the Ardrossan to Saltcoats Coast Site of Special Scientific Interest (SSSI) and Geological
Conservation Review (GCR) site, alongside the Local Nature Reserve (LNR) and Local Nature
Conservation Site (LNCS). However, with respect to the SSSI it was concluded that there was unlikely to
be any significant effect. 
With respect to the LNR and LNCS, while there was a risk associated with any extension of hard defences
impacting on the dunes, the use of soft engineering works was considered to mitigate and potentially
enhance the value of the dunes. The potential impact of ongoing erosion of the Spoil Heap was, however,
noted, recognising that, following further investigation, should this be an issue, this impact would need to
be mitigated. 
The HRA concluded that there would be no direct, indirect or cumulative impacts on nature conservation
interests, particularly those with statutory protection such as Natura sites.

Page 28

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 13 
2.1.1 Key Issues and Objectives.
Issues
From the above description the key issues are in relation to:
• The risk to the railway line and the hinterland area inland of the railway.
• The potential increased flood risk to property within Saltcoats and Stevenston. 
• The potential longer-term risk to the railway line due to erosion of the dunes. 
• The risk to the active travel route behind the dunes and along the Promenade. 
• The ongoing erosion and coastal change to the dunes and the potential impact on and impact of
the recreational use of the area. 
• The need to maintain the open space use of the area. 
• The management of the transition between the hard defence of the Promenade and the natural
dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination alongside
considering the impact on use and coastal change.
• The important landscape and natural environment of the area. 
Objectives for Management (including those defined by the SG2023 guidance).
The following core objectives are set for management of the area, based on the issues identified above:
• To minimise, as far as possible, reliance on hard coastal management. 
• To support the natural development of the shoreline, considering opportunity for enhancing the
natural function of the area, with a focus on adaptation to coastal change. 
• To maintain the important regional transport network.
• To maintain and, as far as possible, to enhance the active travel interconnectivity across the area. 
• To maintain and, as far as possible, to improve access to the use and enjoyment of the important
amenity and recreational value of the area (recognising the potential impacts on the natural
function of the area and the need to improve access for different coastal users). 
• To consider and address the transition between the existing hard defence to the west and the
natural dune line. 
It is noted that to some degree there may be conflict in fully achieving all objectives and that all objectives
may not, therefore be achievable.
2.1.2 Previous studies and current policy
There have been a number of previous studies undertaken covering this frontage, including; 
• Irvine to Ardrossan Coastal Study (Royal Haskoning 2005)
• Ayrshire Shoreline Management Plan (RPS, 2018)
• Dynamic Coast 
• Stevenston Climate Action Town Workshops (2023)
• Community Led Adaptation Plan Climate Action Towns Final Report (February 2024)
• Stevenston Beach Coastal Study (Royal HaskoningDHV, 2025) 
Previous Policy and Current Management
The current SMP Policy Unit 6c2.1 encompasses Ardrossan to Stevenston Point. 
The plan for Policy Unit 6c2.1 is to hold the line across the short-term, medium-term and long-term. This
overall policy at the scale of the SMP, takes account of the significant infrastructure and property at risk
over the northern part of the policy unit. The Plan also recognises the specific nature of Stevenson Beach.

Page 29

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 14 
In particular, the Plan recognised the dunes at Stevenston as a whole and as part of the overall defence
system to the hinterland. Recognising the erosion that was occurring, the SMP recommended the need to
manage erosion at Stevenston beach, promoting the use of soft engineering methods to do so. 
The Community Led Adaptation Plans recognised the ongoing problem of erosion to the Steveston Beach
and that with Climate Change this would present challenges for management. Overall, the Adaptation
Plan recognises the need to manage the area in a manner sympathetic to coastal change avoiding the
need for hard defence.

Page 30

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 15 
2.2 Physical Baseline 
2.2.1 Coastal Form and Geomorphology
The frontage extends across the lower lying valley running to the east back through the town of
Stevenston (Figure 2.4). The valley is formed by the higher ground to the north, underly much of
Saltcoats, and by the higher ground running back from Stevenston Point. Typical, ground levels within
the valley are around 4.5m OD to the back of the coast, rising to around 6m OD to 7m OD further
inland. 
The higher ground to the north runs out to the rock outcrop underlying Saltcoats Harbour. This rock
outcrop and the harbour structures form the northern headland to the Local CCAP area. 
The nature of the higher ground running inland from Steveston Point is understood to have been built
up with colliery waste over the natural dunes. Steveston Point was constructed out by deposition of
waste out over the naturally sandy foreshore. The Point was constructed over the early part of the last
century and now acts as the southern headland to the area, influencing the behaviour of the southern
foreshore and, effectively separating the Local CCAP area from the coastal interaction with the
shoreline running south along the Ardeer Peninsula. 
Figure 2-4: Projections of erosion from Dynamic Coast. 
The constraint imposed by the two headlands has allowed further development of the natural dune
system. This natural alignment has, however, been significantly altered and advanced by the
construction of the railway and the hard defence (The Promenade) to the railway line. 
Quite clearly, as a result of the construction of the Promenade, the foreshore width has been squeezed
over the northern section of the frontage, with progressive lowering of the beach in this area. In the
absence of this defence, it seems probable that dunes the dune system would have extended further to

Page 31

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 16 
the north, across the valley but set back typically by some 150m compared to the current defence
alignment. 
More specifically across the Stevenston Beach area, historically there has been a progressive process
of erosion, driven to a large degree by an apparent reduction of sediment feed to the overall
embayment, but also, potentially by the construction of the Promenade. 
In addition to increased erosion at the backshore, this has manifested in significant change to over the
foreshore and the reduction in the dune spit across the mouth of the Steveston Burn. 
Associated with this change, there has been a progressive emergence of the base of the Spoil Heap
(the Headland), which is having an increasing impact on the development of the western dunes system. 
With sea level rise there will be increased pressure on the defence along the Promenade, increased the
erosion at the end of the Promenade and general increased erosion over the whole length of the dune
system. With further emergence of the spoil heap, this continues to erode at a slower rate. 
A more detailed assessment of the geomorphological development and change is covered in the
Stevenston Beach Coastal Study. 
2.2.2 Tide and water levels
Table 2-1 sets out the Tide and extreme waters relevant to the area, including the projection of water
levels with sea level rise. 
Table 2-1: Water levels (baseline 2024) with change in water levels with sea level rise based on UKCP18 RCP8.5 95%’ile. 
Base year
2024
Water levels with Climate change sea level rise
2050 2075 2100 2125
Astronomic Tide levels
Mean low water
Spring (MLWS) -1.3 -1.12 -0.84 0.49 -0.08
Mean low water Neap
(MLWN) -0.7 -0.52 -0.24 0.11 0.5
Mean high water
Neap (MHWN) 0.90 1.08 1.36 1.71 2.1
Mean high water
Spring (MHWS) 1.5 1.68 1.64 1.83 2.7
Highest Astronomic
Tide 2.01 2.15 2.34 2.57 3.21
Extreme water levels
1 in 1 yr. (T1) 2.68 2.87 3.14 3.14 3.88
1 in 10 yr (T10) 3.09 3.28 3.55 3.55 4.29
1 in 50 yr (T50) 3.39 3.58 3.85 3.85 4.59
1 in 100 yr (T100) 3.52 3.71 3.98 3.98 4.72
1 in 200 yr (T200) 3.65 3.84 4.11 4.46 4.85
Note all values given as m. OD. 
Astronomical tidal levels shown in Table 2-1 derived from POLTIPS for the nearest ‘Standard Port’ of
Irvine, with present day extreme water levels based on the 2017 Boundary Conditions report.

Page 32

No embedded text on this page.

Page 33

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 18 
Figure 2-6: Longshore wave energy. 
Significant to the management of the area, the Figure shows that effectively, for all wave directions,
over the Sandylands Promenade section the longshore energy is towards the south towards Stevenston
Beach. However the plot also shows that for the dominant wave directions the magnitude of this
southerly drift potential tends to fall off suggesting a low drift over the western section of dunes. 
Within the lee of Steveston Point the drift rates tend to be more typically towards the north. 
In interpreting this, it is noted that as sediment was lost from the foreshore in front of the Promenade,
there would be a reduced sediment supply to the dunes, with a tendency for the pattern of erosion to
move to the east. However, importantly the plots also highlight that across the southern section of the
bay and extending part way back across the dunes there would tend to be sediment accretion. 
Key Interactions
From the above, rather than the Promenade defence disrupting the sediment drift pattern, it has been
the reduction of sediment supply from the foreshore to the west that has resulted in the erosion to the
frontage to the east. Furthermore, the plot shows the significant benefit derived from the shelter
provided by Steveston Point in creating an area of relatively stability over the east beach area. 
2.2.5 Primary Control Features
The primary control features associated with the area are the two main headlands, creating the overall
bay shape. 
Within the embayment, the Promenade defence fixes the position of the shoreline and has historically
influenced the supply of sediment to the east. When first constructed, the prom resulted in sediment
being lost from the foreshore in front of the wall. This would have initially benefited the dunes until the

Page 34

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 19 
beach supply was exhausted, subsequently reducing this supply as further erosion of the coast was
prevented. 
The development of the local headland forming at the Spoil Heap will, over time, increasingly influence
the developing shape of the western part of the Stevenston Beach area, tending to retain the alignment
of the dunes to the west but also, potentially limiting change between the headland and the Burn. 
2.2.6 Coastal Change
Historic
Past coastal change at Stevenston Beach has been assessed using geo-rectified historic maps that are
available to view on the National Library of Scotland’s website (Map images - National Library of
Scotland (nls.uk)). Further detail on historical change can be found in the coastal management study. 
In summary of historical change, it is seen that there has been significant longer term change and
erosion across the main area of the bay and that:
• As the backshore has set back this has exposed features within the local hinterland which have
had a more significant influence on the shoreline shape – most notably at the spoil headland
and in relation to the outfall.
• As the backshore sets back this has created a more distinct interface between the hard defence
to the west and the more natural area of dune.
• The set back of the shoreline and reduction of the larger dune system has had less influence on
the position of the back channel to Burn, such that the Burn now encounters the shoreline much
closer to where the channel cuts initially to the shore. 
Present day 
Google Earth air imagery together with available Lidar has been used to examine recent coastal
change. Phase I and Phase VI Lidar was obtained from the Scottish Government Remote Sensing
Portal with Lidar covering 2011/12 and 2021/22. 
Recent coastal change can be summarised as follows: 
• There has been ongoing erosion immediately to the south of the northern slipway, with erosion
at a typical rate of around 0.6m/yr.
• The dune between this area of erosion and the spoil headland has remained relatively stable.
• The influence of the spoil headland has become more evident, with deposition of spoil at the
crest of the beach. However, at the eastern side of the headland there appears to have been
ongoing erosion of the cliff face at a typical rate of around 0.2m/yr. 
• There has been substantial erosion of the dune spit to the western side of the Burn. The head
of the spit has retreated to the west and is now, effectively in line with upstream alignment of
the Burn. The face of the dune has set back in the order of 10m.
• Apart from change directly associated with the position of the outfall channel of the Burn, the
backshore to the east of the Burn has remained relatively stable with some potential accretion. 
Notwithstanding local change and variation due to storm periods and periods of local beach building, it
is concluded that the overall change is quite fundamental and will continue to develop in the future.
Future projections
With sea level rise the whole alignment of the frontage will attempt to roll back, adjusting to the
increased water depth and consequential increase in wave heights.

Page 35

No embedded text on this page.

Page 36

No embedded text on this page.

Page 37

No embedded text on this page.

Page 38

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 23 
2.3 Discussion of Management
2.3.1 General
No Active Intervention
In line with the SG2023 guidance the starting point for assessing ongoing management is an initial
presumption that the coast should be allowed to evolve naturally, moving away from maintaining existing
defences. In effect this presumption aims to challenge the perspective that just because defences are
currently in place they should be maintained. This aims to test the benefit that existing defences deliver
alongside examining the degree to which defences might realistically be sustained over the longer term,
considering also what capacity there is for adaptation to change. 
In terms of the overall area, the main coastal defence is the seawall fronting the Promenade. This protects
the use of the Promenade, the railway line and, over the longer term, protects critical areas of the
hinterland. Recognising the current deterioration of the defence and the worsening of the situation with
sea level rise this current defence might be expected to fail in, potentially 20 to 50 years’ time. Under this
general scenario, no action would be taken to repair the defence and failure over the wider area would
rapidly occur, with progressive and quite rapid erosion potential and eventually back by some 150m into
the hinterland. 
This would have major consequence both locally and in terms of use of the much wider area. 
Assuming that a major “clean-up” operation was undertaken, the erosion of the frontage has potential to
release additional sediment to the coastal system, with potentially some benefit to the dunes but, over the
longer-term, with the whole bay re-adjusting to a more natural alignment, which would continue to roll
back. 
Under this effective No Active Intervention approach, there would be continued erosion of the Stevenston
Beach dunes as discussed in Section 2.2.6 but with no active management of the use of the area. While
there would be some continued natural development of the foredune area, this would continue to be in
conflict with the use of the area. 
With Current Management
The current SMP policy is for Hold the Line (HTL) over the whole area. However, over the Stevenston
Beach area this policy was qualified, suggesting that, in detail, holding the line would involve the use of
soft engineering methods, although no specific details were provided as to what this might involve. 
Holding the Line over the Promenade area would require significant future investment to address both the
increasing risk of undermining and increasing risk of overtopping. Critically, the current level of the
promenade is typically set at a level of around 4.6m OD, with a crest wall over the critical area set at
around 5.5m OD. While it might be feasible to increase the height of the wall, adapting in this way would
have serious consequences in terms of the use of the promenade and on the visual appearance of the
defence. Over the full 100 years considered by the CCAP, it is noted that the promenade would be
submerged typically during a 1 in 50 year extreme water level event. 
More strategically, continued defence of the promenade based on the current linear approach to
management, would hold the alignment of the defence at its eastern end, increasingly in advance of the
alignment of the of the dunes to the east, increasing the discontinuity between the two frontages.     
In terms of the dune system, in the recent past, attempts have been made to install sand fencing and local
soft engineering approaches to management as suggested by the SMP. Due to the pressure from erosion

Page 39

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 24 
and the fundamental system changes occurring, such works have not been successful. The Stevenston
Beach Coastal Study has examined this in more detail and concludes that without major sediment
restoration, which would involve major intervention and would only be feasible at a wider scale
encompassing the promenade area, to effectively hold the line there would be the need for, potentially
locally, hard intervention. 
This, together with the issues relating to the transition between the Promenade and the dune, the potential
release of contaminated material from the exposed spoiled heap and the longer-term issues around
maintaining and manging the use of the area, poses a significant challenge in delivering the HTL policy set
out in the SMP. 
This overall assessment of management is taken forward in considering setting specific policy for the two
CCAP Policy Units, recognising that interaction between the two areas.

Page 40

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 25 
2.3.2 6c2.B1 - Sandylands Promenade
2.3.2.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention (NAI)
A No Active Intervention (Do Nothing) approach would result in the continued degradation of the sea wall
and promenade. This would ultimately lead to the increasing rates of overtopping associated with sea
level rise which would affect the functionality of the promenade and have a significant impact on the long-
term viability of the railway. 
The wall and promenade would ultimately fail, likely due to undercutting and washout of the wall toe, or
due to failure of the superstructure. Failure of the wall would result in the loss of the Promenade and the
railway line and over the longer-term significant loss and disruption to the current use of the hinterland.
There would be significant negative economic impacts on the towns of Saltcoats, Ardrossan and
Stevenston associated with the loss of the railway. These would also contribute to regional and national
losses. 
There is little or no opportunity for sensible and appropriate adaptation to these impacts. A No Active
Intervention approach is not considered to be an acceptable approach due to these impacts. Critically, this
assessment assumes the realistic continued use and importance of the railway line over the long term. In
the long term future (one hundred years and beyond) this would need to be reviewed, given the increased
pressure on the defence. 
Manged Realignment (MR)
Given the proximity of the railway and the associated value of the Promenade in providing an important
and valued active travel route, there is very limited or no opportunity for managed realignment of the
existing defence line. This option is not, therefore considered viable. 
Again, critically, this assessment assumes the realistic continued use and importance of the railway line
over the long term. In the long-term future (100 years and beyond) this would need to be reviewed, given
the increased pressure on the defence. Should, in the future, there be any discussion related to the
ongoing use and alignment of the railway line, then this option would need to be considered further,
considering any opportunity this might give to realignment of the defence. 
Hold the Existing Line (HTEL)
Under this current management approach potentially over the next 20 years it might be possible to adopt a 
Do Minimum approach, sustaining the existing sea wall, with the potential need to extend the local area of
rock toe to reduce overtopping and address under mining. Beyond this period, a basic Do Minimum
approach would become increasingly difficult to sustain. Ultimately, this would result in the promenade
and railways being regularly affected by overtopping to the point where they could not be used safely. 
In developing this forward, to sustain the existing form of defence, there is likely to be the need to
substantially raise the crest of the wall and potentially over the long-term increasing the level of the
Promenade and continue to extend and improve the rock toe. Further into the future, this strictly linear
approach to maintain the defence is likely to become increasingly unsustainable. 
Alternative approaches might, therefore, be needed. Examples include the potential for a full rock
revetment and/or shore linked or nearshore breakwaters. There might be options to undertake major
beach recharge, however, from an outline assessment undertaken by the Stevenston Beach Coastal
Study, this would require significant import of sediment to provide an adequate longer-term protection to
the sea wall.

Page 41

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 26 
In considering potential options for delivery of HTEL to the Promenade, consideration would need to be
given to the potential impact on the Steveston Beach dunes and, specifically should beach recharge be
undertaken, consideration of potential wider impacts on the SSSI to the north. 
More immediately, there has been significant deterioration at the eastern end of the Promenade,
potentially impacting on the integrity of the Promenade defence and for erosion to threaten the railway. In
line with the basic principles set out for development of the CCAP, the policy for Unit 6c2.B1 would be to
avoid further extension of the linear approach further into Policy Unit 6c2.B2, imposing hard control over
the natural development of the dunes. This is discussed further in developing policy for the Stevenston
Beach area. 
The above discussion of policy options is summarised below in concluding the recommended policy for
PU 6c2.B1. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 2-3 below.
Table 2-3: Policy Assessment - 6c2.B1-Sandylands Promenade
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints and
opportunity
No Active
Intervention
(NAI)
Abandon
defences, no
further
investment
Fails to deliver core
objectives for the area.
Not considered
acceptable
Major change – limited
adaptive capacity,
impacting on both
strategic and local
values and use of the
area.
Managed
Realignment
(MR)
Remove
defences and
reconstruct on
a setback line.
Limited or no width for
realignment without loss of
strategic assets.
Not considered
viable
Major change – limited
adaptive capacity,
impacting on both
strategic and local
values and use of the
area.
Improve
existing
(HTEL)
Maintain and
improve. 
Meets core objectives subject
to further consideration of
specific options.
Increasing longer term (100
year) investment.
Viable Further consideration
of interaction with
Policy Unit 6c2.B2.
Long-term review.
Sub- Options:
Do Minimum -
Short term
maintenance
Ongoing investment,
becoming increasingly
unsustainable beyond year
20.
Not considered
sustainable
over the
medium term
Requires longer term
planning.
Rock
revetment and
raise
Direct improvement to
existing wall becoming
increasingly unsustainable.
Potentially not
considered
sustainable
over the
medium to
longer term
Potential impact on
use of area. Longer-
term sustainability
issues.

Page 42

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 27 
Breakwaters /
Nearshore
Rock
Structures 
Reduces exposure to existing
defences with potential to
improve beach. May still
require direct enhancement of
the beach.
Viable Secures existing
defence over the
medium to long term-
term. 
Beach
Nourishment
Reduces exposure to existing
defences. 
Increases sediment supply
along frontage to south. 
Potentially
viable in
combination
with another
option.
Secures existing
defence over the short
to medium-term. 
From the above, the policy over both the short and long term is for Holding the Existing Line. 
The assessment, however, highlights key trigger decision points in relation both to the need for
considering longer term options and in terms of the interaction between this unit and management of
Steveston Beach. This is considered in setting out the overall Dynamic Adaptive Pathway and Action Plan
for the Local CCAP area in Section 2.4.   
2.3.2.2 Consultation
Initial discussion has been held with Network Rail on their long-term ambitions for the management of the
defences fronting the railway. 
In developing the Steveston Beach Coastal Study initial discussion has been held with NatureScot and
other stakeholders in considering broader issues potentially relating to the wider area. Points raised during
this process have been considered in developing the initial assessment of policy options for this CCAP
Policy Unit. 
As the Local CCAP is taken forward, further discussion would be undertaken with respect to individual
elements of the Plan, building on the consultation that took place during the development of the SMP and
the detailed public and stakeholder consultation undertaken as part of developing the Stevenston Beach
Coastal Study.

Page 43

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 28 
2.3.3 6c2.B2 - Stevenston Beach
2.3.3.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the continued erosion of the dunes over
the western part of the frontage. In particular, this would be most pronounced at the interface with the
promenade, where the slipway is already at risk of becoming outflanked. Continued erosion of the dunes
in this section would result in the outflanking of the seawall and promenade and lead to the failure of the
slipway and ultimately may contribute to failure of the seawall resulting in significant, possibly catastrophic
impacts on the railway. 
The ongoing erosion of the dunes north of the Stevenston Burn would result in further exposure of the
spoil heap located in the central section of the frontage. The composition of the spoil heap is currently
unknown, although initial inspection has not highlighted significant issues. A No Active Intervention
approach would result in the spoil heap being eroded and its contents dispersed into the environment. 
Under this approach, along the eastern section of the frontage, the complex pattern of erosion and
accretion around the Stevenston Burn would continue. The only control to this erosion being a concrete
outfall structure situated in the centre of the eastern section of dunes. 
Under a No Active Intervention approach it is taken that there would be no specific management of the
use of the area, resulting in uncontrolled footfall through the dune system. This is already seen as being a
significant issue and threat to both the ecological diversity and physical structure of the dunes. As such,
this approach fails to deliver the potential for enhancement of the area. Unmanaged pedestrian pressures
would contribute to erosion of the dune crest and potentially blowouts, increasing the risk of coastal
erosion to the hinterland. Furthermore, it would fail to address longer term adaptation in an integrated
manner. 
While in principle, a No Active Intervention approach is seen as allowing the general natural development
of the dunes system, there are key issues that would not be addressed, specifically:
• Failing to address the issues associated with the transition between the hard defence to the west,
with the risk of further ad hoc management and extension of hard linear defence extending across
areas of dune. 
• Failing to further explore and address the potential risk associated with erosion of the spoil heap. 
• Failing to address the issue associated with ad hoc trampling of the dune system. 
• Failing to address and raise awareness and potential need for ongoing adaptation over the longer
term in relation to the car park and facilities associated with the important amenity and
recreational use of the area.
• Fail to address and consider potential opportunity for longer term management of the area of
marsh. 
On this basis, a No Active Intervention policy is not considered to address the issues of management and
the objectives for the area. 
Manged Realignment (MR)
The Stevenston Beach Management study has examined the potential for soft engineering approaches to
management of the issues identified above. This examination concluded that typical soft engineering
approaches would not be appropriate due to the ongoing pressure on the frontage.

Page 44

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 29 
However, in considering such approaches the coastal study did conclude that there would be significant
benefit in considering ways in which the use of the area could be modified and adapted to address much
of the human pressure on the dunes and natural environment. An outline assessment and management
plan has been defined by the coastal study. This assessment promotes:
• The need to sustain and improve the condition of the slipway at the end of the Promenade,
integrating this with development of a longer term modified approach to managing the transition,
both securing the Promenade defence and addressing the longer term risk to the railway due to
erosion of the dunes. This would, however, require significant engineering works, with the
potential to construct a small shore connected breakwater. 
• Focussing access from the open space and car park behind the dune along the line of the existing
outfall, currently seen as being important in locally managing the dunes and influencing the
position of channel of the Stevenston Burn over the foreshore. This, over time, may require further
minor engineering works to reinforce the outfall route, while allowing more natural development of
the dune over adjacent areas. 
Further management activities would be put in place, developed with stakeholders and the community,
looking at how sign posting, fencing and potentially locally enhancing and rationalising the internal foot
path network. 
Alongside this, the current approach would be to allow the spoilt heap to erode naturally, while
undertaking ongoing monitoring of potential contamination. Under this MR approach, the intent would be
to allow continued erosion but recognising that this would need to be kept under review, with the potential
need for some form of future longer-term defence. 
It is recognised that a MR policy as set out above, would require hard engineering works at the slipway
and in manging the transition between the Promenade and the dunes and that there may be the need for
local intervention at the outfall and possibly at the spoil heap headland. However, the overall approach
aims to provide the same basic outcome as intended by the SMP in minimising intervention and allowing
natural adaption of the dunes. Associated with this the approach aims to set up the structure for adapting
use of the area working within the constraints of future coastal change. 
Managed realignment, as set out above, is considered to be viable and in line with both the principles
discussed in SG2023 and in best delivering the objectives for management. 
Hold the Existing Line (HTEL)
Taking a more rigorous perspective of holding the existing line of defence, resisting the natural erosion of
the dunes over the whole area is considered unnecessary, unsustainable and undesirable, failing to
deliver the objectives set out for the CCAP. A such this option is not considered to be appropriate. 
The above discussion of policy options is summarised below in concluding the recommended policy for
PU 6c2.B2. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 2-4 below.

Page 45

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 30 
Table 2-4: Policy Assessment - 6c2.B2 Stevenston Beach
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints and
opportunity
No Active
Intervention
(NAI)
Abandon
slipway and
allow erosion
of the dunes. 
No
intervention to
manage
erosion of
dunes.
While notionally, allowing
natural ongoing evolution of
the dunes, this option would
fail to address important
issues including the risk to the
promenade and the railway
line and in failing to promote
adaption of use within the
area. 
Not
considered
acceptable
Major change – with no
view to creating a
structure for adaptation.
Managed
Realignment
(MR)
Sustain the
promenade
slipway
through
intervention.
Allow for the
natural
development
of the dunes. 
Provides a sustainable
approach to management of
the transition area.
Allows natural realignment of
the dunes across the
remainder of the frontage,
while locally managing critical
issues.
Viable Secures critical defence
over the medium to long
term. 
Establishes a framework
for ongoing adaptation. 
Improve and
extend
defences.
(HTEL)
Protect area
against
erosion.
Severe impact on the natural
development of the dunes.
Not
appropriate
Longer-term
sustainability. Severe
impact on the natural
environment. 
From the above, the policy over both the short and long term is for Managed Realignment. The approach
to manage of the transition will need to be developed in detail in partnership and with further discussion
with statutory stakeholders and the community. 
There remains some degree of uncertainty with respect to management of erosion to the spoil heap, this
would be reviewed as part of ongoing management, based on further monitoring. 
Management of access points to the shoreline will subject to ongoing review with the intent to adapt and
modify the approach. 
The overall access management will be developed as an ongoing process with stakeholders and the
community, while recognising the longer term need for further adaptation to coastal change.
2.3.3.2 Consultation
The Stevenston Beach Coastal Study informed a suite of consultation activities undertaken with a broad
range of stakeholders. The consultation undertaken on the draft coastal study report were successful in
raising awareness of the Ayrshire Shoreline Management Plan and the Coastal Study itself. The vast
majority of questionnaire respondents felt that the consultation had been successful at raising awareness
of the issues faced at Stevenston Beach. 
The consultation identified a stakeholder group who had not previously been engaged with, being the
equestrian community. Via the British Horse Society (BHS), and members of the public, a number of
specific considerations were raised with regards to access which had not previously been considered.

Page 46

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 31 
The consultation has confirmed that there is a broad level of support for access management at
Stevenston Beach, supporting the conclusions of the coastal study report. 
A major issue raised throughout the consultation process relates to ongoing engagement. This is fully
supported by NAC and how this is best undertaken will be considered in developing the overall approach
to management.

Page 47

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 32 
2.4 Summary of Local CCAP 
The overall intent of the Local CCAP recognises the need to maintain defence of the Sandylands
Promenade (subject to ongoing funding arrangements) to secure important strategic and local assets and
infrastructure. Notwithstanding the increasing pressure on this defence, particularly with sea level rise, it is
considered that this can be undertaken in a sustainable manner. Consideration needs to be given to
possible alternative forms of defence. Typically, this would need to be considered over the next 20 years
as the basic ‘Do Minimum’ approach becomes increasingly difficult to sustain. Over the far long-term (100
years and beyond), continued defence may require significantly greater investment. This longer-term issue
will require ongoing review, particularly as longer-term planning is undertaken as to the railway line. 
Over the Stevenston Beach area, the intent is to generally allow natural ongoing coastal change. As part
of this, the intent is to develop, with the community and stakeholders a modified structure for managing
access along and through the dunes. The aim of this is to minimise the impact on the dunes while still
maintaining the important use and recreational value of the area. This approach will recognise the ongoing
change to the dunes and will be adapted as part of ongoing management. 
The Plan recognises and discusses the important interaction between the hard defence to the Promenade
and the natural dune system. The intent of the Plan is to manage this area without the encroachment of
the hard defence further to the east. The Stevenston Beach Coast study sets out in outline the manner in
which the transition could be managed. This approach requires further detailed development and funding,
with this potentially becoming critical over the next 10 to 20 years. This approach is being discussed with
Network Rail and further discussion with stakeholders. To a degree the approach to short term
management of the slipway will depend on the outcome of these discussions but the intent is to sustain
this important slipway as part of the emerging access plan. 
There are, as identified above, several key decision points in developing the Local CCAP for this area in
relation to triggers for change with respect to the form of defence to the Promenade (20 years) and in
relation to developing the detail with respect to the transition zone (10years). 
In addition, there is a degree of uncertainty with respect to the ongoing erosion rate to the dunes and the
potential issues associated with management of erosion to the spoil heap. These uncertainties will, to a
degree, be addressed through monitoring, recognising the CCAP will require ongoing review. 
In outline, the critical trigger and decisions points are highlighted in the Dynamic Adaptive Pathway set out
below (Section 2.4.1.1). 
Based on this, an initial Action Plan has been developed as set out in Section 2.4.1.2. 
Within the Local CCAP two distinct but interconnected CCAP Policy Unts are identified and the
recommended policy for each area is set out in Table 2-5. 
Table 2-5: Summary of high level CCAP policies
Local CCAP Policy Unit  Short term
Policy 
Longer term
Policy 
Notes 
6c2.B1-Sandylands
Promenade
HTEL HTEL Need to develop medium to longer
term approach.
6c2.B2 Stevenston Beach MR MR Ongoing adaption to coastal change
with local intervention.

Page 48

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 33 
The Local CCAP updates and provides greater clarity and detail with respect to management of individual
sections of the coast as compared to the single Policy Unit defined by the SMP. In principle, however, the
overall intent of management remains similar; with the intent to sustain the defence to Sandylands
Promenade, while allowing a more adaptive approach to management of the Stevenston Beach frontage. 
In particular, the approach to management set out in the Local CCAP reinforces the need to consider
mitigation measures discussed in the SMP, in:
• Considering alternative options for management of the Sandylands Promenade specifically in
terms of its interaction with the wider area.
• Considering management of the transition between the hard defence line and the natural dunes,
minimising the need to further extend the hard defences to the east. 
• Allowing a more adaptive approach to management of potential contamination arising from
erosion of the Spoil Heap.
• Allowing the natural evolution of the dunes, while encouraging development of a coherent Access
Management Plan for the area. 
This remains in line with and addresses the key issues identified in the SMP SEA Environmental
Statement. 
Alongside this, the CCAP has identified the potential opportunity for further habitat enhancement in
providing the policy structure for revision of the Stevenston Beach Local Nature Reserve Management
Plan and in identifying the potential for future change to the marsh area associated with the Stevenston
Burn. 
2.4.1 Coastal Change Adaptation and Action Plan
The Local CCAP aims to provide a policy structure for delivery of ongoing adaptation to coastal change.
As part of this, and within this high-level structure, there are clear elements that will need to be considered
in detail, recognising also that there remain uncertainties principally associated with the time scale and
rate of change in sea level rise.   
Within the Plan, therefore, there are key points in time when decisions will need to be made. Such
change, will be driven by change in the physical conditions impacting on the coast and, typically, by
subsequent change in condition or standards of defence and the level of risk or the natural response of
the coast. These are referred to as Trigger Points. 
Associated with this, there are certain enabling actions which will be required to allow change to occur or
further investigations or discussion which will determine the specific management response. These
actions will culminate in decisions need to be made. These are referred to as Decision Points.
2.4.1.1 Dynamic Adaptive Pathway
Figure 2.10 sets out the critical Trigger Points and the associated Decisions Points, setting out where and
how actions and decisions will allow the Local CCAP to be developed into the future.   
As identified in Figure 2.10, the aim is to ensure that the necessary discussion and additional
investigations are undertaken in a timely manner such that informed decisions are made in advance of
when any Trigger Point is reached. The Actions associated with the Pathway are set out in the Action Plan
in Section 2.4.1.2.

Page 49

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 34 
Figure 2-11: Dynamic Adaptive Pathway
Key:

Page 50

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 35 
2.4.1.2 Action Plan
The key actions taking forward the Local CCAP are set out in Table 2-6.
Table 2-6: Local CCAP Action Plan
Action Description Notes  Timescale
Year
(trigger)
Sandylands Promenade
1 Continue to maintain existing hard defences Secures defence over the
short term, allowing
consideration of longer-term
options.
1 (20)
2 Highlight and raise awareness of short to
medium-term risk and support preparation of
option planning
Ensures continuity of
management across the
wider area.
1 (20)
3 Raise awareness of very long-term
sustainability issues.
Maintain long-term
awareness of possible
issues in relation to review of
forward planning
20 (100)
Stevenston Beach and transition
4 Ongoing discussion with Network Rail and
statutory stakeholders with respect to transition
area.
Determines further
development of specific
coastal management
options.
1 (5 to 10)
5 Undertake further development of option(s) for
transition area
Detailed option study 1 (5 to 10)
6 Undertake short term measures to sustain
slipway
Needs to be integrated with
longer-term options for
management of transition. 
2 (5 to 10)
7 Ongoing monitoring of spoil heap, with
potential need for further investigations
Longer term planning of local
options for management of
spoil heap. 
3 (15)
8 Develop and implement improved access point
associate with outfall. 
Improves access and
management of the change.
Also exemplifies potential
options for general access
management
1 (3)
9 Further discussion and development of access
management plan with community.
Progresses development of
overall access plan, allowing
opportunity for funding.
2 (5)
Broader Area
10 ongoing monitoring Allows review of trigger
points and informs decisions
ongoing

Page 51

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 36 
3 Local Coastal Change Management Plan 6c2.D
Irvine Harbour and Irvine Beach
The development of the Local CCAP is set out with an initial discussion and description of the larger
CCAP area and subsequent discussion of management of the two specific policy unit areas. The final
section brings this together in summarising the intent of the Local CCAP. 
Overall Plan area: 
• General Characterisation: 
o Description, 
o Identification of key features, issues and objectives.
o Previous studies and current management policy, 
• Physical Baseline:
o Geomorphology, 
o Tide and water levels and sea level rise
o Wave climate
o Sediment transport and control features,
o Coastal change and flood risk 
Discussion of Management:
• General discussion over the wider area.
• Local Area (CCAP Policy Unit) assessment
o Initial Screening of Policy Options 
o Consultation 
Summary of Overall Plan
• Overall intent of management
• Policy Summary
• Coastal Change Adaptation and Action Plan
o Dynamic Adaptative Pathway
o Action Plan 
A detailed study (Irvine Beach Coastal Study – RHDHV 2025) of the Irvine Beach has recently been
undertaken, providing more local detail and making specific recommendations for management. This
Local CCAP 6c2.D draws strongly on this study, aiming the capture the higher level issues, providing the
more strategic context in line with the SG2023 guidance. 
This report is provided (under separate cover) as Appendix 3A to this CCAP assessment.

Page 52

No embedded text on this page.

Page 53

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 38 
hub. This reflects the importance of the area to the town of Irvine and more generally, strategically, to
North Ayrshire, with the important historic links to the maritime environment. 
Irvine beach area comprises a relatively wide sandy beach, stretching south towards Troon and is largely
backed by a dune system, although the form and behaviour of the dune and hinterland use varies along its
length. 
The northern section of the beach has a long industrial history, previously housing both a Royal Ordnance
Factory and an Iron and Chemical works. The site has largely been restored to grassed amenity lands at
the northern end but signs of the past remain. Most obviously, the historic past is evidenced in this area by
the massive spoil heap some 500m south of the Harbour, with the toe of the mound now becoming
exposed by erosion. This large mound has been converted into a viewing point with a sculpture known as
‘the dragon.’ 
Further south, where the toe dune has been eroded there are further signs of the industrial heritage, with
remnants of fencing and local buildings now being exposed. Further south the slightly more stable dune is
backed by a golf course with features of the golf course relatively close to the back of the dune. 
Social and Built Environment
There are properties typically to the back of the road running along the harbour area, typically developed
at the same level as the quay at a level of around 4.1m OD. The Harbour is currently an active port with
around 40 moorings and the road acts as an important access route to the Harbour Entrance and as
access to the main car park for Irvine Beach. 
As identified earlier the area is an important open space forming the basis for the development of the
Great Harbour Masterplan. Recent development along the Harbour has been encouraged in an effort to
reinvigorate this important historical area. Signs of the success of this are evident in the repurposing of
sites, including the Harbour Arts Centre. 
The area is therefore considered important to the general regeneration efforts as an important attractive
waterfront and coastal destination for local day visitors and tourists. With the Local Development Plan
supporting the development of a ‘Maritime Mile’ at the Harbourside to make the best use of the
Harbourside’s unique location, heritage, and environment to create new opportunities for local people and
to attract new investment into the area (Great Harbour Master Plan 2023). 
The main northern area of Irvine Beach provides an
extremely well-used open space with a high amenity
and reactional value, linked through to the important
open space behind the Harbour and the integrated
use and appeal of the wider area. 
The diverse use of the northern part of the open coast
is highlighted in the Strava Global Heatmap shown in
Figure 3.2.  
This highlights both the use of the beach and the
direct hinterland to the back of the dunes. 
Figure 3-2: Current active use based Strava's Global Heatmap.

Page 54

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 39 
Further south, the beach area and hinterland continue to be well used, although more generally for
walking rather than specific static beach use. Over the southern part of the frontage the beach is well used
but the hinterland is occupied by golf courses (the Royal Troon and the West Gailes). 
Natural and Historic Environment
Two nationally designated SSSI areas are shown in Figure 3-3:. To the north is the Bogside Flats SSSI
encompassing the larger area of the Garnock
Estuary. It is noted that this site abuts the
Harbour area. Within the area of the open coast
is the West Gailes SSSI, focussing on the dunes
and extending back across part of the golf
courses. 
The dune system covered by the West Gailes
SSSI is critically dependent on maintaining the
continuity of sediment supply necessary in
sustaining the dunes. 
Figure 3-3: Designated sites. 
In addition to the designated sites the natural environment is highly valued by users of the area. 
The Environmental Report, developed from the SEA and HRA as part of the SMP process did highlight the
proximity of the Bogside Flats SSSI and the presence of the West Gailes SSSI, included within the Local
CCAP area. 
With respect to the Bogside Flats SSSI the main potential impacts were considered in assessing policy
relating to the management of the main estuary area, although the Environmental Report did note that
design of any works along the Harbour frontage would need to consider possible influence on this SSSI,
particularly during construction. 
The main potential impacts on the West Gailes SSSI related to change in sediment supply and, more
directly in relation to any works undertaken in addressing ongoing erosion to the dune and the capacity of
the dune to adapt to coastal change. 
The potential impact of ongoing erosion of the Spoil Heap was noted, recognising that, following further
investigation, should this be an issue, this impact would need to be mitigated by some form of
management but that this would also need to consider the potential impact on coastal process and
sediment supply. 
The HRA concluded that there would be no direct, indirect or cumulative impacts on nature conservation
interests, particularly those with statutory protection such as Natura sites.  
3.1.1 Key Issues and Objectives
Issues
From the above description, the key issues are in relation to:
• The potential risk to the use and regeneration of the Harbour area with sea level rise.

Page 55

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 40 
• The risk to the active travel routes and open space behind the dunes and further south to potential
users of the golf courses. 
• The ongoing erosion and coastal change to the dunes and the increased pressure on the dunes
from excessive and ad hoc use of the dunes. 
• The ongoing erosion of the spoil heap considering potential release of contamination.
• The important landscape and natural environment of the area, specifically the ongoing change to
the West Gailes SSSI. 
Objectives for Management (including those defined by the SG2023 guidance).
The following core objectives are set for management of the area, based on the issues identified above.
• To minimise, as far as possible, reliance on hard coastal management 
• To support the natural development of the shoreline, considering opportunities for enhancing the
natural function of the area, with a focus on adaptation to coastal change 
• To maintain defence to the Harbour area and raise awareness of any need for adaptation.
• To maintain and, as far as possible, to enhance the interconnectivity across the area. 
• To maintain and, as far as possible, to improve access to the use and enjoyment of the important
amenity and recreational value of the area (recognising the potential impacts on the natural
function of the area and the need to improve access for different coastal users). 
• To consider and address the potential for the release of contaminated material form the spoil
heap. 
It is noted that to some degree there may be conflict in fully achieving all objectives and that all objectives
may not, therefore be achievable.
3.1.2 Previous studies and current policy
There have been a number of previous studies undertaken covering this frontage, including; 
• Irvine to Ardrossan Coastal Study (Royal Haskoning 2005). This study principally considered
the coastal processes and potential management options for the coast north of the Garnock;
however it does provide some information on sediment movement and wave climate relevant to
the area .
• Ayrshire Shoreline Management Plan (RPS, 2018): The Ayrshire SMP provides sustainable
shoreline management policies for the Ayrshire frontage across three epochs; the short, medium
and long term. 
• Dynamic Coast: The Dynamic Coast project aims to provide the strategic evidence base on the
extent of coastal erosion in Scotland. This will support the Scottish Government and the Scottish
Public Sector decision-making and indicate areas of highest coastal erosion risk, where a more
detailed evidence base may be required. The project focuses on:
o Improving evidence of coastal change.
o Raising awareness about coastal erosion.
o Supporting decision-makers to help Scotland’s coast adapt to future climate impacts. 
• Irvine Great Harbour Masterplan (NAC, 2024): the core elements of the wider masterplan
include the development of the maritime mile waterfront walkway, the provision for additional
Beach Drive housing and the regeneration of the coastal hinterland.
• Irvine Beach Coastal Study (January 2025): In 2024 Royal HaskoningDHV were commissioned
to develop a coastal study at Irvine Beach. The Scope of the Coastal Study was to develop:
o A Natural Flood Risk Management study to identify suitable and implementable erosion
management for the dune system at Irvine Beach, in line with the adopted Ayrshire SMP.

Page 56

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 41 
o The identification and outline design of suitable measures to improve, manage and
safeguard beach access, given the anticipated pressures on Irvine Beach from the effects
of North Ayrshire Council’s Great Harbour Masterplan.
Previous Policy and Current Management
The current SMP Policy Unit 6c2.3 encompasses the whole Irvine Bay to Gailes Burn area. The plan for
Policy Unit 6c2.3 is to hold the line across the short-term, medium-term and long-term. 
Notwithstanding this overall policy at the scale of the SMP, taking account of the potential assets at risk,
specifically at the entrance to the Harbour and the important recreational use of the area, the plan
identified the need to sustain the overall function of the dunes – hence the policy for hold the line. 
However, the SMP recognised that the dunes provided this function as a whole and recognised the need
to manage erosion, promoting the use of soft engineering methods to do so. 
In the medium to long-term, erosion of the dune system will continue to require management. The effects
of climate change will create additional pressures and dune stabilisation measures may need to be
updated and extended. Flood defences on the River Irvine may need to be improved in order to provide
adequate flood protection.

Page 57

No embedded text on this page.

Page 58

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 43 
At the entrance to the estuaries, it has been recorded from previous studies that sediment tends to
move into the estuary on the Flood tide but then it is exported and deposited as a bank (and ebb delta)
in the nearshore area. 
There has, apparently, been little consistent or substantial change in the form and size of this
nearshore bank, suggesting also that sediment might be expected to be redistributed from the bank
back to the shoreline. 
Clearly as the shoreline has been cut back the general movement of sediment, distributes sediment
along the shore. 
Local to the entrance channel, the shoreline both to the north and south is reported as having been
areas of very local accretion. 
With sea level rise; with increased water depth and increased wave heights at the shore, there will be
an acceleration of the general process of set back with increased rates of erosion. 
Within the estuary, it may be seen that the Harbour area does to some extent constrain and fix the
general curve of the Irvine channel. Some slight pressure for bed erosion in this area may be
expected, although there are no reports of undermining to this area. 
The land levels within the wider area of the Garnock Estuary are relatively low, with substantial areas
only just above HAT. With sea level rise the normal tidal prism within the main estuary has the
potential to increase quite sharply, potentially increasing flows through the narrow entrance channel.
This could influence the development of the nearshore ebb banks, potentially giving rise to change at
the foreshore. 
While the Irvine Beach Coastal study has identified significant local variation in the form and function of
different sections of the dune, from a geomorphological perspective the most significant change in
geomorphology is due to the emergence of the toe of the large waste mound tending to modify locally
the behaviour of the dunes to either side. 
3.2.2 Tide and water levels
Table 3-1 sets out the Tide and extreme waters relevant to the area, including the projection of water
levels with sea level rise. 
Astronomical tidal levels shown in Table 3-1 derived from POLTIPS for the nearest ‘Standard Port’ of
Irvine, with present day extreme water levels based on the 2017 Boundary Conditions report. 
Projections of water levels with Climate Change and sea level rise are taken from the United Kingdom
Climate Projections 2018 (UKCP18) project. 
In line with the guidance provided by SG2023, the UKCP18 8.5 95 percentile value for sea level rise
has been used.

Page 59

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 44 
Table 3-1: Water levels (baseline 2024) with change in water levels with sea level rise based on UKCP18 RCP8.5 95%’ile. 
Base year
2024
Water levels with Climate change sea level rise
2050 2075 2100 2125
Astronomic Tide levels
Mean low water
Spring (MLWS) -1.3 -1.12 -0.84 0.49 -0.08
Mean low water Neap
(MLWN) -0.7 -0.52 -0.24 0.11 0.5
Mean high water
Neap (MHWN) 0.90 1.08 1.36 1.71 2.1
Mean high water
Spring (MHWS) 1.5 1.68 1.64 1.83 2.7
Highest Astronomic
Tide 2.01 2.15 2.34 2.57 3.21
Extreme water levels
1 in 1 yr. (T1) 2.68 2.87 3.14 3.14 3.88
1 in 10 yr (T10) 3.09 3.28 3.55 3.55 4.29
1 in 50 yr (T50 3.39 3.58 3.85 3.85 4.59
1 in 100 yr (T100) 3.52 3.71 3.98 3.98 4.72
1 in 200 yr (T200) 3.65 3.84 4.11 4.46 4.85 
3.2.3 Wave Climate
A nearshore wave climate was determined as part of the modelling undertaken in the Irvine to
Ardrossan Coastal Study (2005). The wave climate determined for a position just offshore of Saltcoats
Harbour is shown in Table 3-2 and Figure 3-5.  
Table 3-2: Irvine wave climate. 
Figure 3-5: Wave Climate.

Page 60

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 45 
The dominant wave sector is from the south to west, with the most frequent wave coming from the
southwest but with the high waves also approaching the area from both the south southwest and west. 
3.2.4 Sediment Transport
The Irvine to Ardrossan Coastal Study (2005) provides a general assessment of sediment drift across
Stevenston Bay under different wave conditions. This is shown in Figure 2.6. 
Rather than attempting to derive specific sediment transport rates, this plot indicates the variation in
longshore wave energy under different wave directions. 
Figure 3-6: Longshore wave energy. 
The Figure shows significant variation in wave energy direction between Ardeer and Troon. Specific to
the Local CCAP it may be seen that there is a general southerly drift from the Irvine Estuary but that
for the dominant wave directions this potential for drift reduces towards the south. 
This would suggest that approaching West Gailes and Gailes Burn, while there is still a weak drift
further south the Gailes area might typically accrete. 
Key Interactions
Assuming that there continues to be some supply over the Irvine beach area, then the supply would
continue to feed the important SSSI area to the south. As and if the spoil heap continues to emerge at
the shoreline and subject to management of this, there is a potential impact that could occur. Any
management in this area of the spoil heap would need to be manged to minimise and mitigate such
change.

Page 61

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 46 
3.2.5 Primary Control Features
The primary control feature associated with the area is the Harbour Pier. At present this appears to
only have a minor local function in holding beach levels directly to the south of the structure. 
Coastal Change
Historic
Past coastal change at Irvine Beach has been assessed using geo-rectified historic maps that are
available to view on the National Library of Scotland’s website (Map images - National Library of
Scotland (nls.uk)). Further detail on historical change can be found in the coastal management study. 
In the 1900s, the hinterlands were dominated by a network of Iron and Chemical works interconnected
by a rail network. Through a review of historic mapping, the presence of many colliery heaps was
noted and these are largely still present on site today. 
An analysis has been undertaken of the longer term historic change based on comparison of MHWS
since 1897 together with an assessment of more recent change based on a comparison of Lidar.
These results are then used to provide the baseline conditions from which to consider potential future
change with increasing sea level rise. 
Generally there appears to have been relatively significant erosion across the whole area between
1897 and 1958, most particularly over the length south from the Harbour entrance, with the shoreline
adopting a more embayed shape. This is possibly linked to the progressive training works to the
Harbour entrance influencing the shoreline to the south – while the entrance channel has been
managed since the early part of the 19h century, it was in the latter part of the 19th century that saw the
construction of the main harbour pier. 
Since 1958, erosion has been significantly less with evidence of slight accretion in some areas. 
Caution has to be applied to these results, in part due to inherent inaccuracies in interpreting historic
mapping but also in considering changes in management that may have influenced the earlier rate of
change.
Present day 
The Coastal Management Study developed an analysis based on 15 cross-shore profiles covering the
main study area and extended this analysis to the south. 
Considering the longer term historical rates of change the general rate of erosion has been in the order
of 0.4m/yr (on average between 1897 to 2010) and 0.1m/yr to 0.3m/yr (on average between 1958 to
2010). This compares to the more recent (2010 to 2022) change at the frontage to either side of the
failing gabion defence to the spoil heap being in the order of 0.4m/yr. 
This would suggest, potentially, that:
• If there had been no defence in place, the frontage as a whole might have eroded back at a
rate of around 0.2m/yr (ignoring the possible influence of the presence of the spoil heap),
• With the defence in place, the erosion immediately to the north and south has increased
marginally to around 0.35m/yr on average. However, if the defence were maintained over the
longer-term, typically, the defended area would form a slight headland in the alignment of the
backshore, with the area to the north potentially being controlled to a degree with a lower rate
of erosion but the area to the south still being subject to a higher rate of erosion.

Page 62

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 47 
• If the defence were now removed or failed, there would be a rapid period of erosion, cutting
back initially by some 5m, but that the erosion would then adjust back to the slower rate of
around 0.2m/yr. 
The Coastal Management Study developed this analysis and projected these erosion rates onto the 15
cross-shore profiles to generate future projections.
Future projections
Projections of sea level rise are as shown in Table 3-3 based on UKCP18 RCP8.5 95%’ile. These
values are rebased to 2024 and extended for the Lower and Baseline scenarios through to 2124.
Table 3-3: Projected rates of sea level rise.
Scenario SLR (m) – base year 2024
2044
Year 20
2074
Year 50
2104
Year 80
2124
Year 100
Baseline: UKCP18 RCP8.5 (95%ile) 0.13 0.46 0.87 1.17 
This analysis built upon the higher-level assessment provided by Dynamic Coast. 
Figure 3-7 shows the indicative erosion profile assuming initially (a) that the defence to the spoil heap
is maintained, with the second plot (b) showing the equivalent erosion for 2050, 2075, 2100 and 2125 if
the defence was allowed to fail and no further works were implemented. 
Figure 3-7: projected future erosion distances. 
It is assumed that in the case where the spoil heap is not defended this section would still erode more
slowly due to the additional volume of material and the potentially greater resistance of the material
being exposed. (In line with this assumption the erosion rate for the spoil heap area is assumed to be
half of the natural erosion of a dune.) 
Significantly, however, is the degree to which the defended frontage, if held, will be in advance of the
naturally developing shoreline and this may impact or influence management of other areas.

Page 63

No embedded text on this page.

Page 64

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 49 
2050 
2075 
2100 
2125 
Figure 3-9: Future Flood Risk

Page 65

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 50 
3.3 Discussion of Management
3.3.1 General
As identified earlier, while it is considered important that management of the two areas: the Harbour area
and the open coast, are considered in an integrated manner. In terms of risk and adaptation the longer-
term risks are quite different and development of future management policy can, to a degree, be
considered separately. 
Within this Section consideration is given to the implications of management under the two baseline
scenarios of No Active Intervention and With Current Management. This then forms the baseline from
which to assess potential alternative options. 
No Active Intervention
In line with the SG2023 guidance, the starting point for assessing ongoing management is an initial
presumption that the coast should be allowed to evolve naturally, moving away from maintaining existing
defences. In effect this presumption aims to challenge the perspective that just because defences are
currently in place that they should be maintained. This aims to test the benefit that existing defences
deliver alongside examining the degree to which defences might realistically be sustained over the longer
term, considering also what capacity there is for adaptation to change. 
With respect to the Harbour, quite clearly allowing deterioration of the Harbour defences and taking no
action to address the longer-term flood risk would result in loss of property and, loss of the road /
operation of the important harbour. 
It would fail to support the efforts for regeneration and improved access to open space. 
In addition to the impact on the Harbour, No Active Intervention would severely constrain the use of the
open coast. 
More specifically over the open coast, while under this No Active Intervention approach it is only to the
south, in the area of the golf courses, where there might be significant loss of specific of assets. No Active
Intervention would fail to address the significant impact of ad hoc trampling within the dunes resulting in
the loss of both ecological function and physical damage to the integrity of the system. 
One of the main issues presently facing the frontage is the significant number, and size, of dune blow outs
as a result of access routes to the beach. It is apparent that a number of these large blow outs are then
subsequently being used as sheltered rest locations which is only aggravating the erosion. 
The development of the coastal hub and events space potentially adds to this risk in the future, particularly
over the northern area of the beach. If not mitigated, the notable increase in foot traffic (particularly during
any events) could lead to terminal erosion of the dunes. 
No Active intervention also fails to address the key risk of potential contamination due to erosion of the
spoil heap, representing a potential health risk and a potential risk to the quality of the environment. 
With Present Management
In terms of the Harbour area the current policy is for holding the line to support the current and future
development of the area. Under present conditions this approach seems appropriate meeting the core
objectives for the area.

Page 66

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 51 
Over the longer term the risk of direct flooding due to sea level rise substantially increases and as part of
the policy for Holding the Line there would need to consider what adaptation measures might be put in
place to mitigate this risk. 
Over the open coast, while the policy for the area is Hold the Line, the SMP recommends that this should
use soft engineering approaches. 
Options to control access through the dunes all fall under the general dune restoration approach (noted
within SEPA’s Natural Flood Management Handbook). It is envisaged that a combination of fencing,
thatching and planting would be utilised to control the movement of people and encourage the use of
designated access points. A review against the masterplan would be required to ensure linkage with the
hinterlands and ensure efficient access routes are designed that minimise the risk of people creating their
own desire lines. 
It is thought that parallel access routes within the dune themselves could be reinforced by boardwalks to
prevent trampling. The alignment of these would be designed such that it recognises the want for the dune
to roll back in response to sea level rise. 
As such the current policy (as qualified by the SMP) is seen as being a sensible way ahead over the
northern section of the open coast. This does however raise the issues both in relation to addressing the
potential risk of contamination form erosion of the spoil heap and further south in with respect to longer-
term management of erosion to the dunes in front of the golf courses. 
This overall assessment of management is taken forward in considering setting specific policy for the two
CCAP Policy Units.

Page 67

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 52 
3.3.2 6c2.D1 - Irvine Harbour
3.3.2.1 Initial Screening of Coastal Change Adaptation Policies
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the continued degradation of the harbour
structures, including quay walls and pontoons. This would ultimately lead to the condition of the harbour
deteriorating to the point where it was unsafe to use. In the medium to long term, sea level rise would
result in increased rates of overtopping and the harbour structures would deteriorate to the point where
they failed. Overtopping and eventual failure of the structures would render the Irvine Harbour frontage
unsustainable, there would be an associated increased flood risk to the highway, and residential and
commercial property. 
Failure of the harbour structures would result in the wider area along Harbour Street becoming unusable.
Locally, there would be a significant negative economic impact on the town associated with the loss of the
harbour. This would also contribute to regional and national losses. 
Furthermore, the important opportunity for place development and regeneration would be lost. A No Active
Intervention approach is not considered to be an acceptable approach due to these impacts. 
Managed Realignment (MR)
Due to the integral use of the harbour associated with the line of defence there is no realistic position for
realignment of the defence. 
Notwithstanding this fundamental constraint, in looking at future management and mitigation for increased
flood risk, there may be scope for incorporating some form of future flood defence within any landscape
design of the Harbour waterfront. This, however, would be better defined as future adaptation associated
with Holding the Existing Line. 
The Managed Realignment is not considered to be realistically achievable. 
Hold the Existing Line (HTEL)
Under this policy option the aim would be to maintain the current Harbour Quay and other defences
including the Harbour Pier. Currently, there is no significant barrier to achieving this. As noted above,
there would be the need to mitigate the potential increased flood risk and this could be achieved by a
basic approach in raising the current level of the quay and associated defences. 
Equally and possibly more in keeping with the aim to maintain an active harbour and to improve the
character and visual aspect of the area, consideration would need to be given to future flood risk and
formal / informal flood defences with any landscape works being undertaken. 
Typically, the key trigger for improvement might in around 50 years’ time, However, awareness of this
longer term risk would allow the opportunity to be taken for improvement at any stage prior to this. 
Policy Summary Assessment
A strategic assessment of options is set out in Table 3-4 below.

Page 68

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 53 
Table 3-4: Policy Assessment - 6c2.D1 - Irvine Harbour
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative capacity,
constraints  and
opportunity
Do Nothing
(DN)
Abandon
harbour and
defences, no
further
investment.
Substantial impact on local
and regional economy with
loss of opportunity for
regeneration.
Not
considered
acceptable
Major change – limited
adaptive capacity
Managed
Realignment
(MR)
Remove
defences and
reconstruct on
a setback line.
No width to establish a new
defence alignment.
Not
considered
realistically
achievable
No scope for adaptation
Improve
existing
(HTEL)
Maintain and
improve.
Significant ongoing
maintenance 
Viable Need for longer term
adaptation and mitigation
of flood risk.
Sub-options:
Raise along
quay
Direct improvement to quay
walls with potential need for
further future works.
Viable  Potential impact on use
of area. Longer-term
sustainability issues
constraining future
adaptation.
Landscaped
flood defence
Secures defences and could
reduce the need for raising
defences the front face
maintaining operation of the
Harbour. 
Requires consideration as
part of general improvements. 
Viable Secures existing defence
over the long term. 
From the above, the policy over both the short and long term is for Holding the Existing Line. 
The assessment highlights the need to consider the longer-term risk within future improvement more
generally to the area. 
3.3.2.2 Consultation
The above assessment of policy confirms the previous policy defined by the SMP. No further detailed
consultation has been undertaken on the proposed CCAP policy at this stage. In taking forward the CCAP
there would be further consultation undertaken on specific elements of the CCAP.

Page 69

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 54 
3.3.3 6c2.D2 - Irvine Beach to Gailes Burn
3.3.3.1 Initial Screening of Coastal Change Adaptation Policies 
No Active Intervention
A No Active Intervention (Do Nothing) approach would result in the ongoing erosion of the dunes
throughout the frontage. Even further south, in the Gailes area, where currently it is reported that the
dunes remain relatively stable, with sea level rise, there would be a progressive roll back of the dunes. 
This issue would be aggravated over the northern section of the frontage by the intensity of use. With no
efforts being taken to manage this pressure there would be further damage to the ecological function and
physical integrity of the dunes. 
More immediately, the gabion baskets at the defended spoil heap are already in a poor condition with a
potential effective residual life in the order of 5 to 10 years. They would continue to break up and would
cease to defend the toe of the spoil heap resulting in erosion of the spoil. It is not currently known to what
degree the contents of this spoil heap pose a significant risk. 
Under this policy, regardless of the potential risk posed by the spoil, spoil would be dispersed on the
beach and into the environment. This requires further investigations. 
Without first determining the nature of the spoil heap, A No Active Intervention approach is not considered
to be an acceptable approach due to the risk of contaminated spoil entering the environment. 
Where the spoil is demonstrated to be non-contaminated, then a No Active Intervention approach could be
considered. However, it is recognised that even under this approach, some degree of access
management is likely to be required in order to manage localised erosional pressures associated with high
levels of footfall. This is particularly critical given the ambitions of the Irvine Great Harbour Masterplan
which anticipates that visitor numbers will increase. 
Manged Realignment (MR)
Given the issues identified above, it is almost certain that some form of management would be required,
although the approach to management would be different over different sections of the area. 
Over the northern section of Irine Beach, under this option the focus of management would be in
managing the intense pedestrian pressure. Typically this would take the form formalising specific access
points, co-ordinating this with travel route and use of the open area behind the dunes. This is considered
in more detail in the Irvine Beach Coastal Study. As highlighted in the study report, there would need to be
consideration of whether such access points might require local physical control or whether it would be
more appropriate to allow more regular adjustment in response to coastal change. Whichever choice is
made, the aim would be to work within the natural coastal change rather than acting to resist such change. 
This general approach would extend over the dunes further to the south ensuring the opportunity is
provided for natural dune restoration while maintaining selected access points for all coastal users. 
Over the southern section of the whole area, further detailed consideration would need to be given to the
possible need for long-term adaptation in the use of the two major golf courses, looking to sustain the
natural protection provided by the dunes by creating greater width within the system. This takes a more
realistic approach to management given difficulty of sustaining a hard approach to defence within a
naturally changing backshore.

Page 70

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 55 
The spoil heap poses a more difficult challenge. Subject to critical further investigation into the nature of
material within the spoil heap and the degree of risk this might pose a range of options for management
have been considered by the Irvine Beach Coastal Study. 
While locally this might be better described in terms of policy as Hold the Existing Line, within the wider
context of management of the whole policy unit it is still considered appropriate to consider this under this
assessment of a broader Managed Realignment approach. 
Other options, identified include:
• Digging out and disposing of contaminated material. This option would have a very large and
ongoing cost and was not considered sensible.
• A staged approach to slow rates erosion, potentially affecting some areas of erosion but limiting
this and more slowing introducing control structures. 
All these options would need to be developed further in detail, specifically considering the potential wider
scale impact on coastal processes but also integrating any approach to sustain travel routes along the
shore and hinterland. 
In summary, under this approach to management, the underpinning principle for the existing dunes would
be to allow natural change to occur, looking to manage and develop approaches for adaptation and
management of use. At the spoil heap, the same underlying principle would apply but recognising that
depending on nature of material within the spoil heap there might be the need for hard defence. 
Overall, Managed Realignment is considered to correctly describe, as above, an approach that would be
sustainable and would work within the underlying objective set out for a CCAP. 
Hold the Existing Line (HTEL)
While as set out above, subject to further investigation of the nature of the spoil heap, there could be the
need to hold the existing defence to the spoil heap, a general policy of holding the overall dune line would
be consider unsustainable, unaffordable and unacceptable in relation to the CCAP objectives. This policy
option is not considered viable. 
Policy Assessment Summary
A strategic summary assessment of options is set out in Table 3-5 below.
Table 3-5: Policy Assessment - 6c2.D2 Irvine Beach to Gailes Burn
Strategic
Approach
(policy)
Description Comment Strategic
Assessment
Adaptative
capacity,
constraints  and
opportunity
No Active
Intervention
(NAI)
No
interventions
to manage
erosion of
dunes.
Substantial impact on
existing environment,
including erosion of
potentially contaminated
spoil heap.
Not considered
acceptable
Major change –
limited adaptive
capacity
Managed
Realignment
(MR)
Manage
change while
minimising
physical
intervention
Allow for the natural
realignment of the dunes.
Specific options to be
considered for the spoil
heap.
Viable and
appropriate
Capacity to adapt to
change.

Page 71

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 56 
Improve
existing
(HTEL)
Maintain,
improve and
extend linear
defence
Major impact on the
natural environment.
Loss of beach and
increasing cost.
Unacceptable  Would fail to
engender
consideration of
adaptation. 
3.3.3.2 Consultation
The Irvine Beach Coastal Study informed a suite of consultation activities undertaken with a broad range
of stakeholders. The consultation undertaken on the draft coastal study report has been successful in
raising awareness of the Ayrshire Shoreline Management Plan and the Coastal Study itself. The vast
majority of questionnaire respondents felt that the consultation had been successful at raising awareness
of the issues faced at Irvine Beach. 
The consultation identified a stakeholder group who had not previously been engaged with which was the
equestrian community. Via the British Horse Society, and members of the public, a number of specific
considerations were raised with regards to access which had not previously been considered. 
The consultation confirmed that there is a broad level of support for access management at Irvine Beach,
supporting the conclusions of the draft coastal study report but that this needs to be developed further. 
In addition, the consultation has elicited useful responses on specific local issues, which are now recorded
and will be considered in ongoing development of management approaches. Furthermore, several
comments were made relating to broadscale issues and these have been considered in developing the
Local CCAP. 
With regards to management of the existing (current) defences, there was no objection to the
recommendations outlined within the draft coastal study report, recognising that options would be
developed further following investigation of the nature of material within the spoil heap . 
A major issue raised throughout the consultation process relating to ongoing engagement. This is fully
supported by NAC and how this is best undertaken will be considered in developing the overall approach
to management. 
It is noted that consultation focused on the northern (Irvine Beach) beach area. While the revised headline
policy for MR differs from the previous SMP headland policy of HTL, in practice the intent for considering
soft engineering approaches, expressed by the SMP, has been clarified and is considered to be better
captured by the proposed policy on MR.

Page 72

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 57 
3.4 Summary of Local CCAP 
The Local CCAP has sub-divided the coast into two policy units with the aim to provide better clarity in
considering CCAP policy. While these two units have very different characteristic and therefore require
different polices, the Units have been grouped under one Local CCAP to reflect and raise awareness that
there are significant inter dependencies, in relation to overall use and access along the coast. 
Overall the intent of the Local CCAP is to maintain and as required manage access along and through the
area, sustaining the specific character and regeneration opportunities for the Harbour, while sustaining the
important natural development of the open coast. 
In detail for the Harbour it is consider sustainable to maintain the defence and use of the area. The CCAP
raises the awareness of potential longer-term increased flood risk with sea level rise, encouraging
consideration of address this future risk in developing detailed plans for the area. The physical trigger
point for adaptation might not occur for 50 years. However, increasing awareness of this risk potentially
allows his to be integrated in current decision making. 
With respect to the open coast Unit, it is proposed that the CCAP policy is revised to one of Managed
Realignment better reflecting and clarifying the implications of the previous caveated policy set by the
SMP. 
The CCAP policy for the open coast Unit is now defined as Managed Realignment. However, in detail, this
might need to be develop in different ways across different sections of the coast. Specifically:
Over the northern Irvine Beach area the intent is to develop in detail a management plan for managing the
intense pressure form use on the dunes. Underpinning this is the intent to minimise intervention at the
dune face, allowing for further adaptation of the access plan in response to coastal change. 
Over the critical spoil heap frontage, the final approach to management would need to be determined
based on further investigation of the nature of material contained within the spoil heap. Again, the
underlying intent is to allow, as far as possible and permissible, the natural development at the shoreline.
However, this recognises that there may need to be hard engineering works in this area to address
potential risks of release of contaminated material. 
Further south, particularly over the area of the golf course, the overall aim is to allow the natural
development and roll back of the dunes, maintaining the important integrity of the back shore area and
supporting the management intent set out in the SSSI designation. This recognises that there may,
therefore, be the need for some adaptation of the golf courses. This need to be considered further working
with the golf course to develop in detail a realistic and sustainable long term plan for management. 
Table 3-6: Summary of high level CCAP policies
Local CCAP Policy Unit  Short term
Policy 
Longer term
Policy 
Notes 
6c2.D1-Irvine Harbour HTEL HTEL Consideration of long-term
adaptation.
6c2.D2 Irvine Beach to
Gailes Burn 
MR MR Ongoing adaption to coastal change
with local intervention and
management plans.

Page 73

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 58 
The Local CCAP updates and provides greater clarity and detail with respect to management of individual
sections of the coast as compared to the single Policy Unit defined by the SMP. In principle, however, the
overall intent of management remains similar; with the intent to sustain the defence to the Harbour
frontage, while allowing a more adaptive approach to management of the Irvine Beach frontage. 
In particular, the approach to management set out in the Local CCAP reinforces the need to consider
mitigation measures discussed in the SMP.
• With respect to the Harbour, the Local CCAP recognises the need to address the increased flood
risk with sea level rise. In examining this, two different options are identified. In developing these
options, in addition to considering the potential impact on the landscape and use of the area, there
would need to be consideration of how the potential impact on the Bogside Flats SSSI might be
minimised and mitigated.  
• Further investigation is required into the nature of material contained within the Spoil Heap and
the potential impact that ongoing erosion of the Spoil Heap would have on the marine
environment. This would be taken forward through development of the Local CCAP.
• Associated with the above, the Local CCAP identifies the need to consider and mitigate the
potential influence any management would have on sediment supply along the shoreline, with
particular reference the potential impacts on the West Gailes SSSI.
• More generally, the overall intent to allow ongoing natural development of the dunes would
maintain the pattern of sediment movement along the frontage minimising the impact on the West
Gailes SSSI.
• The Local CCAP recommends the development of specific management plans for adaptation of
the West Gailes area.   
This remains in line with and addresses the key issues identified in the SMP SEA Environmental
Statement. 
Furthermore, developing the Access Management Plan aims to balance the need to maintain important
and values use of the open coast alongside sustaining a healthy dune system. 
3.4.1 Coastal Change Adaptation and Action Plan
The Local CCAP aims to provide a policy structure for delivery of ongoing adaptation to coastal change.
As part of this, and within this high-level structure, there are clear elements that will need to be considered
in detail, recognising also that there remain uncertainties principally associated with the time scale and
rate of change in sea level rise, alongside the present uncertainty associated with the nature of material
contained within the Spoil Heap.   
Within the Plan, therefore, there are key points in time when decisions will need to be made. Such
change, will be driven by change in the physical conditions impacting on the coast and, typically, by
subsequent change in condition or standards of defence and the level of risk or the natural response of
the coast. These are referred to as Trigger Points. 
Associated with this, there are certain enabling actions which will be required to allow change to occur or
further investigations or discussion which will determine the specific management response. These
actions will culminate in decisions needing to be made. These are referred to as Decision Points.
3.4.1.1 Dynamic Adaptive Pathway
Figure 3.9 sets out the critical Trigger Points and the associated Decisions Points, setting out where and
how actions and decisions will allow the Local CCAP to be developed into the future.

Page 74

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 59 
Figure 3-10: Dynamic Adaptive Pathway.
KEY

Page 75

Project related 
4 April 2025 NORTH AYRSHIRE CCAP PC5329-RHD-XX-XX-RP-X-1001 60 
As identified in Figure 3.9, the aim is to ensure that the necessary discussion and additional investigations
are undertaken in a timely manner such that informed decisions are made in advance of when any Trigger
Point is reached. The Actions associated with the Pathway are set out in the Action Plan in Section
3.4.1.2.
3.4.1.2 Action Plan
The key actions taking forward the Local CCAP are set out in Table 3-7. 
Table 3-7: Local CCAP Action Plan
Action Description Notes  Timescale
Year
(trigger)
Irvine Harbour
1 Continue to maintain harbour defences Secures defence over the
short to medium term,
allowing consideration of
longer-term options.
1 (50)
2 Highlight and raise awareness of longer-term
flood risk
Allows integration of
potential future risk withing
current planning
1 (50)
Irvine Beach and Spoil Heap
3 Detailed investigation of potential
contamination
Determines further
development of specific
coastal management
options.
1 (5 to 10)
4 Develop options for coastal management to
Spoil Heap.
Detailed option study 3 (5 to 10)
5 Detailed development of access plan. Working
with partners to agree position of access points
and approach to ongoing management
Needs to take account of
access management along
spoil heap area. 
3 (5)
Broader Area
6 Raise awareness of potential need for
adaptation to golf course frontages
Establish initial contact and
discuss how future planning
may be facilitated.
1 (20)
7  Ongoing monitoring Allows review of trigger
points and informs decisions
ongoing

Page 76

North Ayrshire Council
Coastal Change Adaptation Plan
Summary Document
DRAFT

Page 77

Introduction to Coastal Change Adaptation Plans (CCAP)
Scottish Government produced interim guidance (SG2023) for development of Coastal Change
Adaptation Plans (CCAP) in February 2023. 
This national initiative recognises the ongoing and constant nature of change at the coast, considering
how we will need to adapt to that change in a sustainable manner; considering how we currently use
and value the coast but also looking forward as to how we may need to respond and adapt to the
increased rate of change due to Climate Change and, in particular, sea level rise.   
The guidance notes that over the last thirty years sea level across Scotland has risen between two
and three times faster than over the previous 100 years, with mean sea level anticipated to rise by
between 0.30-1.16 m by 2100. This will, in many areas, result in increased risk of flooding and
increased pressure on the coast for erosion. 
While it is accepted that there are some uncertainties both in relation to the actual rate and timescale
over which sea level rise will occur and uncertainties over how the coast will respond to such change,
and while there is still the need to explore further our capacity for change, the guidance emphasises
the need to start this process now:
• Raising the awareness of the challenges with individuals, communities, businesses and local
organisations, allowing people to plan for change, working within the broader structure
provided by the CCAP to shape their future. 
• Informing Local Development Plans as to future risk, identifying where future coastal
development should and should not be located.
• Helping to safeguard important and valued natural features, including those that can protect
the coast, alongside looking for opportunities for enhancing biodiversity and maintaining the
mosaic of interconnected habitats. 
• Taking a placemaking approach to deliver, as far as possible, multiple benefits across the
whole range of interest associated with the coastal zone.  
Critically, the guidance recognises the ongoing nature of coastal management. The aim is to develop
CCAPs based on the information already collated within Shoreline Management Plans (SMPs) and
building on information developed through further local studies alongside national data sets such as
provided by Dynamic Coast.
However, as part of the CCAP process, the aim is to critically examine how we currently manage the
coast, with the opportunity to challenge current practice from a longer-term, broader scale
perspective, ensuring that future challenges are identified and that short term decisions do not
constrain future opportunities.  
National Guidance - Principles and Objectives
The national guidance does not prescribe exactly how local authorities should develop their Coastal
Change Adaptation Plans (CCAP). Instead, it provides guidance as to what they should seek to
achieve and how it might be delivered. Importantly, the national guidance recognises that “one size
does not fit all”, and the guidance recognises the need to maintain flexibility for appropriate local and
regional CCAP delivery structures to emerge, recognising that CCAPs need to reflect the complexity
of local areas.
However, the guidance sets clear principles and objectives that the CCAP should work within.
Core Principles. 
• to create a vision for well-adapted and resilient management, properly integrated into other
policies by taking a more land use planning approach, avoiding locking-in future generations
to unsustainable actions, considering that sea levels are expected to continue to rise well
beyond the end of this century;
DRAFT

Page 78

• to seek opportunities to support and regenerate communities and address inequalities. In
particular, policy should anticipate that changes to property protection and property values will
increasingly come into focus as adaptation pathways are developed; and
• to deliver multiple benefits (for example economic, environmental or amenity enhancements),
and to promote sustainable infrastructure and work to preserve natural features and
ecosystems.
Key Objectives
In line with the core principles the following overall objectives of the CCAP are:
• To promote the resilience of our natural coastline and begin the process of adaptation to
climate change;
• To set out a process for a proactive approach to coastal adaptation planning that will
maximise opportunities and minimise risk from climate change impacts;
• To ensure our collective coastal adaptation journey starts now; and
• To support local authorities to begin the process.
Approach to developing North Ayrshire’s CCAP
The North Ayrshire coastline covers a length of some 150km of shoreline, including areas of the
mainland alongside the principal islands of Great Cumbrae and Arran. Within this length of coast,
there is large variation in the coastal character. In some areas such as the major towns there are
significant lengths of man-made protection. In many other areas there are small settlements alongside
many small ports and local harbours, all set within broader areas of natural shoreline. 
There is, therefore, a clear need to adapt the level of detail provided by the CCAP to reflect the local
nature of the coastline in any location and to maintain relevance to future management of specific
areas. The current SMP (RPS 2018) provides the initial background and structure in identifying the
broader interdependencies throughout the area, this provides the opportunity to focus in more detail
on individual areas. 
To this end, the approach being taken to the development of the North Ayrshire CCAP is to develop a
series of Local CCAPs. It is recognised that this process will be ongoing but it does also allow focus
on areas where further information and study has been carried out. The intent is to develop these
Local CCAPs in a consistent format around the whole coastline, ultimately allowing collation of these
Local CCAPs as one CCAP for North Ayrshire.
This Document
This document sets out the overall approach being taken to the development of the North Ayrshire
CCAP, as discussed above. As Local CCAPs are developed additional sections will be added
providing a summary and record of the how policy and Plans are being developed covering the whole
coastline. As Local CCAPs are developed the conclusions from the SMP will be reviewed and
updated with the intent that these summary documents will replace the SMP policy for each area.   
North Ayrshire Council have taken the opportunity provided by having undertaken two detailed local
studies to start this process and to develop Local CCAPs covering these areas. The two areas, so far
included are for:
• The Sandylands Promenade and Stevenston Beach (Local CCAP 6c2.B), and
• Irvine Harbour to Gailes Burn (Local CCAP 6c2.D)
DRAFT

Page 79

The Sandylands Promenade and
Stevenston Beach 
(Local CCAP 6c2.B)
Summary Document
DRAFT

Page 80

Context
General description
The Sandylands Promenade and Stevenston Beach, covering some 2.5km of coastline, is formed as
an effectively artificial embayment formed by the historic development of the southern Saltcoats
Harbour arm, constructed out over a natural rock outcrop, and Stevenston Point, which was formed
over the last century by tipping of mining waste.
The area is covered by two relatively distinct, although interconnected, sections.
The Sandylands Promenade, comprises a major sea wall protecting the railway line and providing
defence to lower lying land behind. The wall is fronted by a low intertidal foreshore with a thin veneer
of sand. Currently, the wall and promenade suffer significant overtopping during major storm events. 
The Stevenston Beach and Dunes, comprises an area of natural dunes extending back into an area
of important open space. The dunes and open space are included with areas designated as a Local
Nature Reserve (LNR) and a Local Nature Conservation Site (LNCS) highlighting the important
ecological value associated with the area. The dunes are currently eroding limiting the opportunity for
dune restoration. There is also significant human trampling causing damage to the dunes. As the
dunes have eroded, this has exposed the toe of an old mining waste spoil heap and this is eroding.
The area is cut by the Stevenston Burn, with the Burn running back into the town of Stevenston. The
channel of the Burn across the foreshore has been subject of significant change, influencing and
being influenced by coastal change.
A critical feature of the area is the transition between the hard defence along the promenade and the
natural section of dunes, with an increasing challenge to maintaing an important slipway and in
managing the transition between the two sections of the coast.  
The SMP context
The SMP (2018) defined the area within the general sub-
cell 6c2, with a further division of the wider area into four
SMP Policy Units. The Local CCAP area is contained
within SMP Policy Unit 6c2.1.
The general policy for this unit is for Holding the Line
(HTL) over the three epochs considered by the SMP.
However, there was an important caveat that, with
respect to Stevenston Beach, the intent was to manage
erosion of the dunes using soft engineering approaches.
In reviewing the SMP, as apart of developing the Local
CCAP, it has been agreed that the SMP Policy Unit
should be further sub-divided into two CCAP Zones:
• 6c2.A, covering Ardrossan and Saltcoats Harbour.
• 6c2.B, covering this Local CCAP area of the
Sandylands Promenade and Stevenston Beach
This retains the ability to consider the important broader
scale interaction across the whole Local CCAP area, with the definition of two CCAP Policy Units
6c2.B1 and 6c2.B2 reflecting the local characteristics of each local area.
SMP Sub-cells and
Policy Units.
DRAFT

Page 81

Coastal Change
The whole area has been subject to historical erosion, with, where the frontage has been defended
along the promenade, a loss of the natural beach. The artificial development of the Stevenston Point
has allowed some retention of sediment over the foreshore resulting lower rates of erosion of the
dunes at the eastern end. The construction of the defence along the Promenade has reduced the
supply of sediment to the dunes and increased erosion has occurred to the dunes immediately to the
east of the Promenade. As the dune line has eroded, this has exposed the toe of the historic Spoil
Heap and this is now acting to partially control the alignment of the frontage.  
With sea level rise the rate of erosion to the dunes will increase. The predicted erosion distances over
the next 100 years are shown in the images below. These erosion lines are based on the UKCP18 8.5
(95 percentile) sea level rise scenario, as recommended in the national guidance for CCAPs.  
Currently, there is relatively low flood risk within the area, although the Promenade and Railway are
subject to severe wave overtopping during major storms. With sea level rise, larger areas will be at
potential risk. This change is shown in comparing the current and future (2100) relative land levels
with respect to coastal water levels. The risk of overtopping of the Promenade wall will similarly
increase.
Management Issues
• The risk to the railway line and the hinterland area inland of the railway.
• The potential increased flood risk to property within Saltcoats and Stevenston.
• The potential longer-term risk to the railway line due failure of the defence and erosion of the
dunes to the east.
• The risk to the active travel route behind the dunes and along the Promenade.
• The ongoing erosion and coastal change to the dunes and the potential impact on and impact
of the recreational use of the area.
• The need to maintain the open space use of the area.
• The management of the transition between the hard defence of the Promenade and the
natural dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination
alongside considering the impact on use and coastal change.
• The important landscape and natural environment of the area.
Predicted erosion over the eastern and western sections of
Stevenston Beach in 20, 50, 80 and 100 years. 
Present day flood risk
areas
Potential flood risk
areas by 2100
DRAFT

Page 82

Policy Update
The overall intent of the Local CCAP recognises the need to maintain defence of the Sandylands
Promenade (subject to ongoing funding arrangements) to secure important strategic and local assets
and infrastructure. Notwithstanding the increasing pressure on this defence, particularly with sea level
rise, it is considered that this can be undertaken in a sustainable manner. Consideration needs to be
given to possible alternative forms of defence. Typically, this would need to be considered over the
next 20 years as the basic ‘Do Minimum’ approach becomes increasingly difficult to sustain. Over the
far long-term (100 years and beyond), continued defence may require significantly greater investment.
This longer-term issue will require ongoing review, particularly as longer-term planning is undertaken
in relation to the railway line. 
Over the Stevenston Beach area, the intent is to generally allow natural ongoing coastal change. As
part of this, the intent is to develop, with the community and stakeholders a modified structure for
managing access along and through the dunes. The aim of this is to minimise the impact on the
dunes while still maintaining the important use and recreational value of the area. This approach will
recognise the ongoing change to the dunes and will be adapted as part of ongoing management. 
The Plan recognises and discusses the important interaction between the hard defence to the
Promenade and the natural dune system. The intent of the Plan is to manage this area without the
encroachment of the hard defence further to the east.
The specific polices defined by the Local CCAP are set out in the table below.
Local CCAP Policy Unit Short term
Policy
Longer term
Policy
Notes
6c2.B1-Sandylands
Promenade
HTEL HTEL Need to develop medium to longer term
approach.
6c2.B2 Stevenston Beach MR MR Ongoing adaption to coastal change
with local intervention.
The Local CCAP updates and provides greater clarity and detail with respect to management of
individual sections of the coast as compared to the single Policy Unit defined by the SMP. 
The approach to management, set out in the Local CCAP, reinforces the need to consider mitigation
measures discussed in the SMP, in:
• Considering alternative options for management of the Sandylands Promenade specifically in
terms of its interaction with the wider area.
• Considering management of the transition between the hard defence line and the natural
dunes, minimising the need to further extend the hard defences to the east.
• Allowing a more adaptive approach to management of potential contamination arising from
erosion of the Spoil Heap.
• Allowing the natural evolution of the dunes, while encouraging development of a coherent
Access Management Plan for the area.
Alongside this, the CCAP has identified the potential opportunity for further habitat enhancement in
providing the policy structure for revision of the Stevenston Beach Local Nature Reserve
Management Plan and in identifying the potential for future change to the marsh area associated with
the Stevenston Burn.
DRAFT

Page 83

Critical Decisions
The following Dynamic Adaptive Pathway diagram highlights where critical decisions will be needed in
developing the CCAP into the future. The need for decisions are drive by anticipated Trigger Points
relating to management of defences and risk or in anticipation of natural coastal change.
Action Plan
The following actions are required in delivery of the Local CCAP
.
Action Description Notes  Timescale
Year (trigger)
Sandylands Promenade
1 Continue to maintain existing hard
defences
Secures defence over the short term,
allowing consideration of longer-term
options.
1 (20)
2 Highlight and raise awareness of short
to medium-term risk and support
preparation of option planning
Ensures continuity of management across
the wider area.
1 (20)
3 Raise awareness of very long-term
sustainability issues.
Maintain long-term awareness of possible
issues in relation to review of forward
planning
20 (100)
Stevenston Beach and transition
4 Ongoing discussion with Network Rail
and statutory stakeholders with
respect to transition area.
Determines further development of specific
coastal management options.
1 (5 to 10)
5 Undertake further development of
option(s) for transition area
Detailed option study 1 (5 to 10)
6 Undertake short term measures to
sustain slipway
Needs to be integrated with longer-term
options for management of transition. 
2 (5 to 10)
7 Ongoing monitoring of spoil heap, with
potential need for further investigations
Longer term planning of local options for
management of spoil heap. 
3 (15)
8 Develop and implement improved
access point associate with outfall. 
Improves access and management of the
change. Also exemplifies potential options
for general access management
1 (3)
9 Further discussion and development of
access management plan with
community.
Progresses development of overall access
plan, allowing opportunity for funding.
2 (5)
Broader Area
10 ongoing monitoring Allows review of trigger points and informs
decisions
ongoing
DRAFT

Page 84

Irvine Harbour to Gailes Burn
(Local CCAP 6c2.D)
Summary Document 
DRAFT

Page 85

Context
General description
The Local CCAP area includes two quite distinct areas covering Irvine Harbour, within and running
along the southern side of the Irvine/ Garnock Estuary and running out to the Harbour entrance
structures, and Irvine Beach extending through from the Harbour Pier to Gailes Burn. The total length
of the area is around 6km, with around 4.5km of that being the main open beach section.
The Harbour comprises a series of vertical quay walls, with property built to the quay at the upstream
end but, more generally, with a road running directly behind the quay with properties, car parks and
open ground further inland. North Ayrshire Council has aspirations to further enhance the Harbourside
area and have developed a Great Harbour Masterplan. The masterplan includes the development of
the maritime mile waterfront walkway and three activity hubs
Irvine beach area comprises a relatively wide sandy beach, stretching south towards Troon and is
largely backed by a dune system, although the form and behaviour of the dune and hinterland use
varies along its length. The northern section of the beach has a long industrial history, and most
obviously, the historic past is evidenced in this area by the massive spoil heap some 500m south of
the Harbour, with the toe of the mound now becoming exposed by erosion. Further south, where the
toe dune has been eroded there are further signs of the industrial heritage, with remnants of fencing
and local buildings now being exposed. Beyond this area the slightly more stable dune is backed by
golf courses with features of the golf course relatively close to the back of the dune.
Within the area of the open coast is the West Gailes SSSI, focussing on the dunes and extending
back across part of the golf courses. A further SSSI, the Bogside Flats SSSI, abuts the Harbour but
principally extends back to encompass the larger area of the Garnock Estuary.
The main northern area of Irvine Beach provides an extremely well-used open space with a high
amenity and reactional value, linked through to the important open space behind the Harbour and the
integrated use and appeal of the wider area.
The SMP context
The SMP (2018) defined the area within the general sub-
cell 6c2, with a further division of the wider area into four
SMP Policy Units. The Local CCAP area is contained
within SMP Policy Unit 6c2.3.
The general policy for this unit is for Holding the Line
(HTL) over the three epochs considered by the SMP.
However, there was an important caveat that, with
respect to Irvine Beach, the intent was to manage
erosion of the dunes using soft engineering approaches.
In reviewing the SMP, as apart of developing the Local
CCAP, the extent of this SMP Policy Unit should be
retained as:
• 6c2.D, covering Irvine Harbour to Gailes Burn.
However, this Local CCAP area is now considered as
two CCAP Policy Units: 6c2.D1 (Irvine Harbour) and
6c2.D2 (Irvine Beach) reflecting the local characteristics
of each local area.  
SMP Sub-cells and
Policy Units.
DRAFT

Page 86

Coastal Change
While the Harbour does to some extent constrain and fix the general curve of the Irvine channel.
Some slight pressure for bed erosion in this area may be expected, although there are no reports of
undermining to this area. Currently structures along the harbour and at the entrance have been
suitably maintained. While, in particular, the Harbour entrance structures do impose significant control
on the natural change at the mouth of the estuary, the maintaining structures are considered to be
sustainable.
Generally, there has been long-term persistent erosion along much of the open coast, with the dunes
remaining slightly more stable towards the West Gailes area. Typically, over the northern section,
recent erosion has been in the order of 0.4m/yr. This erosion has exposed the toe of the major Spoil
Heap which has been protected by gabion baskets which are now failing. An assessment of future
erosion distances is shown in the figure below.
Currently there is little direct flood risk across the area. With sea level rise, some areas will be at
increased potential risk, particularly in the area of the Harbour. This change is shown in comparing the
current and future (2100) relative land levels with respect to coastal water levels. 
Management Issues
• The potential risk to the use and regeneration of the Harbour area with sea level rise.
• The risk to the active travel routes and open space behind the dunes and further south to
potential users of the golf courses.
• The ongoing erosion and coastal change to the dunes and the increased pressure on the
dunes from excessive and ad hoc use of the dunes.
• The ongoing erosion of the spoil heap considering potential release of contamination.
• The important landscape and natural environment of the area, specifically the ongoing
change to the West Gailes SSSI.
Indicative erosion over the open
coast in years 20, 50, 80 and 100.
Present day potential flood
risk
2100 potential flood risk
DRAFT

Page 87

Policy Update
The Local CCAP has sub-divided the coast into two policy units with the aim to provide better clarity in
considering CCAP policy. While these two units have very different characteristic and therefore
require different polices, the Units have been grouped under one Local CCAP to reflect and raise
awareness that there are significant inter dependencies, in relation to overall use and access along
the coast.
The intent of the Local CCAP is to maintain the use of the Harbour area sustaining the specific
character and regeneration opportunities. The CCAP raises the awareness of potential longer-term
increased flood risk with sea level rise, encouraging consideration of addressing this future risk in
developing detailed plans for the area. The physical trigger point for adaptation might not occur for 50
years. 
With respect to the open coast Unit, it is proposed that the CCAP policy is revised to one of Managed
Realignment better reflecting and clarifying the implications of the previous caveated policy set by the
SMP, with the intent to sustain as far as possible the natural development of the dunes. Over the
northern Irvine Beach this require development of an Access Management Plan. Underpinning this
Plan the intent to minimise intervention at the dune face. 
Over the critical spoil heap frontage, the final approach to management would need to be determined
based on further investigation of the nature of material contained within the spoil heap. The underlying
intent is to allow, as far as possible and permissible, the natural development at the shoreline.
However, this recognises that there may need to be hard engineering works. 
Further south, the overall aim is to allow the natural development and roll back of the dunes,
supporting the management intent set out in the SSSI designation. This recognises that there may,
therefore, be the need for some adaptation of the golf courses.
Local CCAP Policy Unit Short term
Policy
Longer term
Policy
Notes
6c2.D1-Irvine Harbour HTEL HTEL Consideration of long-term adaptation.
6c2.D2 Irvine Beach to
Gailes Burn 
MR MR Ongoing adaption to coastal change
with local intervention and management
plans.
The Local CCAP reinforces the need to consider mitigation measures discussed in the SMP.
• With respect to the Harbour, the Local CCAP recognises the need to address the increased
flood risk with sea level rise considering the potential impact on the landscape and use of the
area.
• Further investigation is required into the nature of material contained within the Spoil Heap
and the potential impact that ongoing erosion of the Spoil Heap would have on the marine
environment. This would be taken forward through development of the Local CCAP.
• Associated with the above, the Local CCAP identifies the need to consider and mitigate the
potential influence any management would have on sediment supply along the shoreline, with
particular reference the potential impacts on the West Gailes SSSI.
• More generally, the overall intent to allow ongoing natural development of the dunes would
maintain sediment supply along the frontage minimising the impact on the West Gailes SSSI.
• The Local CCAP recommends the development of specific management plans for adaptation
of the West Gailes area.
Furthermore, developing the Access Management Plan aims to balance the need to maintain
important and values use of the open coast alongside sustaining a healthy dune system.
DRAFT

Page 88

Critical Decisions
graphicalThe following Dynamic Adaptive Pathway diagram highlights where critical decisions will be
needed in developing the CCAP into the future. The need for decisions are drive by anticipated
Trigger Points relating to management of defences and risk or in anticipation of natural coastal
change.
Action Plan
The following actions are required in delivery of the Local CCAP
Action Description Notes Timescale
Year (trigger)
Irvine Harbour
1 Continue to maintain harbour defences Secures defence over the short to
medium term, allowing consideration
of longer-term options.
1 (50)
2 Highlight and raise awareness of longer-
term flood risk
Allows integration of potential future
risk withing current planning
1 (50)
Irvine Beach and Spoil Heap
3 Detailed investigation of potential
contamination
Determines further development of
specific coastal management options.
1 (5 to 10)
4 Develop options for coastal management
to Spoil Heap.
Detailed option study 3 (5 to 10)
5 Detailed development of access plan.
Working with partners to agree position of
access points and approach to ongoing
management
Needs to take account of access
management along spoil heap area.
3 (5)
Broader Area
6 Raise awareness of potential need for
adaptation to golf course frontages
Establish initial contact and discuss
how future planning may be
facilitated.
1 (20)
7 Ongoing monitoring Allows review of trigger points and
informs decisions
ongoing
DRAFT

Page 89

DRAFT

Page 90

No embedded text on this page.

Page 91

APPENDIX D

Page 92

No embedded text on this page.

Page 93

APPENDIX E