Page 1

NORTH AYRSHIRE COUNCIL 
30 September 2025 
Cabinet 
Title:    Interim Progress Report on the Second Ayrshire Local
Flood Risk Management Plan 
Purpose:  To update Cabinet on the progress and next steps in relation to
the publication of the Interim Progress Report on the Second
Ayrshire Local Flood Risk Management Plan. 
Recommendation:  It is proposed that Cabinet: 
a. notes the progress made by North Ayrshire Council in
implementing the flood risk management measures
contained in the Second Ayrshire Local Flood Risk
Management Plan; and.
b. approves the North Ayrshire Council content for the
Interim Progress Report provided at Appendix 1; and
c. notes that that similar updates are being collated by South
Ayrshire Council, East Ayrshire Council, SEPA and
Scottish Water; and
d. notes that all updates will be included in an Ayrshire
Interim Progress Report on the Second Ayrshire Local
Flood Risk Management Plan which will be published prior
to the required deadline of 31st December 2025 and that
the information will also be added to the interactive
‘webmap’ developed on behalf of the Lead Local Authority
Forum. 
1. Executive Summary 
1.1 The Flood Risk Management (Scotland) Act provides a framework for the assessment
and sustainable management of flood risk throughout Scotland. 
1.2 For flood risk management purposes, the country is divided into 12 Local Plan
Districts, with Ayrshire operating as a single Local Plan District (LPD). 
1.3 North Ayrshire Council as the lead local authority for the Ayrshire LPD, is required to
review and publish by the end of December 2025, an interim progress report on the
actions contained in the current Ayrshire Local Flood Risk Management Plan, which
was approved by Cabinet on 29 November 2022.

Page 2

1.4 North Ayrshire Council is responsible for 34 area-specific flood risk management
measures within its area. The progress made towards implementing the 34 North
Ayrshire Council-led actions is summarised in Appendix 1 of this report. 
1.5 The interim progress report also requires updates to be provided by the other
responsible flood authorities in the Ayrshire LPD on the management measures that
they are responsible for. These are South Ayrshire Council, East Ayrshire Council,
Scottish Water, and SEPA. These authorities are currently finalising a progress review
of their actions and have undertaken to produce these in sufficient time for collation
and publication of the Interim Progress Report. 
1.6 On receipt of the partner updates, an Ayrshire Interim Progress Report will be finalised
in time to meet the December 2025 publication date required by legislation. 
1.7 It is intended that the progress review will be included in a national ‘webmap’ which
will help to increase public awareness and engagement with the Local Flood Risk
Management Plan measures.  
2. Background 
2.1 The Flood Risk Management (Scotland) Act (‘the Act’) provides a framework for the
assessment and sustainable management of flood risk throughout Scotland. 
2.2 For flood risk management purposes, the country is divided into 12 Local Plan
Districts, with Ayrshire operating as a single Local Plan District (LPD). 
2.3 For each LPD, the Scottish Environment Protection Agency (SEPA) is required to
publish a Flood Risk Management Plan (‘the SEPA FRM Plan’) and the lead local
authority is required to publish and report on a Local Flood Risk Management Plan
(‘the Local FRM Plan’).  Both plans contain the same LPD-wide and community
specific measures to manage flood risk but the local plan provides further information
about the timing, funding and coordination of the measures. 
2.4 Designated responsible flood authorities lead on the implementation of the measures
contained in both plans. For the Ayrshire LPD, these authorities are North Ayrshire
Council, South Ayrshire Council, East Ayrshire Council, Scottish Water, and SEPA. 
2.5 The current SEPA FRM Plan was published in 2021 and the Local FRM Plan was
published by North Ayrshire Council as the lead local authority for the Ayrshire LPD, in
2022. The measures in these plans cover the second 6-year long flood risk
management planning cycle 2022-2028 and replace the earlier plans that were
published in 2015 and 2016 from the first flood risk management planning cycle.   
2.6 The Act requires North Ayrshire Council to publish an interim progress report on the
Local Flood Risk Management Plan by the end of December 2025 and to make copies
of the report available for public inspection. 
2.7 A review of North Ayrshire Council’s actions has been completed and is contained in
Appendix 1 of this report. The other responsible authorities (South Ayrshire Council,
East Ayrshire Council, Scottish Water and SEPA) are undertaking a review of their
actions and will submit this information to North Ayrshire Council for inclusion in the

Page 3

interim progress report once they have secured the necessary internal approvals to
publish their review details. 
North Ayrshire Progress Review 
2.8 Guidance on the review of flood risk management measures has been issued by the
Lead Local Authority Forum (‘the LLAF’). The LLAF shares good practice, exchanges
information and addresses common issues connected with the development,
publication and reporting of flood risk management plans. Membership includes Lead
Local Authorities, Scottish Water, Scottish Government and SEPA. The LLAF’s
guidance includes further information about the classification of measures into red,
amber and green categories in order to provide a nationally consistent progress
review. 
2.9 There are 34 area-specific flood risk management measures that North Ayrshire
Council are responsible for leading. These are detailed in Appendix 1. Of the 34
measures, 25 are categorised as green as they have progressed or are progressing
as planned,1 measure is categorised as amber as it is still anticipated to be complete
by the end of the current second planning cycle but not as initially programmed, and 8
measures are categorised as red as they are unlikely to be completed by 2028 within
the current planning cycle. All of the ‘red’ actions relate to Flood Protection Scheme
measures and are classed ‘red’ due to uncertainty over funding.     
Flood Protection Schemes 
2.10 The Upper Garnock Valley Flood Protection Scheme and the Millport Coastal Flood
Protection Scheme that were identified in the first flood risk management planning
cycle and carried over into the current cycle are now complete and categorised as
green. The construction of the Mill Burn, Millport Flood Protection Scheme, which was
also identified in the first flood risk management planning cycle is anticipated to start in
2025 and is also categorised as green. 
2.11 Delays in capital funding availability has significantly delayed the implementation of
some of the other flood scheme design actions that were first identified in the second
flood risk management planning cycle. These relate to the development of the North
Ayrshire Council-led Flood Protection Scheme measures at Lamlash, Brodick, Fairlie
and Irvine. 
2.12 A funding review is underway by the Scottish Government and COSLA joint settlement
distribution group. Until this review is complete, funding for all flood scheme measures
identified in the second flood risk management planning cycle throughout the country
cannot be confirmed. Without funding confirmation, further progress on the
implementation of flood scheme measures cannot be made. 
2.13 Overall progress at the mid-point in the current planning cycle is however well
advanced with planned studies at Brodick, Lamlash, Irvine, the ‘Three Towns’, Largs
and the upper Garnock Valley having already been completed or underway that will
inform future measures if funding is confirmed.  A planned surface water management
plan at Kilwinning and a flood study at Whiting Bay (categorised as ‘amber’) are yet to
start but are anticipated to be complete by the end of the current planning cycle in
2028.

Page 4

2.14 There are also LPD wide actions which are not area-specific but cover activities such
as asset maintenance, land use planning, and awareness raising. The review of these
actions is yet to be agreed with the other responsible authorities but are anticipated to
be categorised as ‘green’ to reflect the ongoing nature of these measures. A list of the
LPD-wide actions is included in Appendix 2 of this report. 
Local Coastal Change Adaptation Plans 
2.15 Since the publication of the second Ayrshire Flood Risk Management Plan there has
been an increasing emphasis placed on coastal change adaptation with interim
Scottish Government guidance being published in 2023. In recognition of this interim
guidance and the associated availability of coastal change adaptation funding,
additional measures have been completed to deliver draft Local Coastal Change
Adaptation Plans for Stevenston & Irvine. These plans update the adopted Ayrshire
Shoreline Management Plan, which was published in 2018, and help to deliver the
shoreline management plan updates that were anticipated to start in the third flood risk
management planning cycle, beginning in 2028. 
Publication 
2.16 Once all updates from the relevant responsible flood authorities are made available,
North Ayrshire Council shall be able to finalise and publish the interim progress report
on the Local Flood Risk Management Plan on the flooding pages of the Council’s and
Ayrshire Roads Alliance websites. Advice has been sought on the format of the report
from the Council’s web team to help meet accessibility standards. 
2.17 An interactive Scotland-wide ‘webmap’ has been developed by the LLAF in order to
increase public awareness and engagement with the Local Flood Risk Management
Plan measures. This ‘webmap’ would supplement the interim progress report and
increase public awareness and engagement with the ongoing and planned flood risk
management actions. The Scottish Collaboration of Transport Specialists (SCOTS)
are looking at agreement from the 32 Local Authorities on a lead hosting authority.
NAC information is ready for upload once hosting is agreed and approval to publish
granted. 
3. Proposals 
3.1 It is proposed that Cabinet: 
a. notes the progress made by North Ayrshire Council in implementing the flood risk
management measures contained in the Second Ayrshire Local Flood Risk
Management Plan; and.
b. approves the North Ayrshire Council content for the Interim Progress Report
provided at Appendix 1; and
c. notes that that similar updates are being collated by South Ayrshire Council, East
Ayrshire Council, SEPA and Scottish Water; and
d. notes that all updates will be included in an Ayrshire Interim Progress Report on the
Second Ayrshire Local Flood Risk Management Plan which will be published prior to
the required deadline of 31st December 2025 and that the information will also be
added to the interactive ‘webmap’ developed on behalf of the Lead Local Authority
Forum

Page 5

4. Implications/Socio-economic Duty 
Financial 
4.1 A formal agreement confirms North Ayrshire Council’s, South Ayrshire Council’s, and
East Ayrshire Council’s funding contributions for North Ayrshire Council’s role as the
lead local authority for the Ayrshire Local Plan District. These funding contributions
cover the additional resources required to publish and report on the Interim Progress
Report on the Second Local Flood Risk Management Plan. 
Human Resources 
4.2 None. 
Legal 
4.3 Publishing the Interim Progress Report on the Second Ayrshire Flood Risk
Management Plan by the end of December 2025 will help to meet North Ayrshire
Council’s obligations as Lead Local Authority under the Flood Risk Management
(Scotland) Act 2009 to publish a report on the review of the Second Ayrshire Local
Flood Risk Management Plan. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 Publishing the Interim Progress Report on the Second Ayrshire Local Flood Risk
Management Plan will help to communicate the progress being made towards
implementing the Council’s Environmental Sustainability and Climate Change
Strategy. 
Key Priorities 
4.6 Publishing the Interim Progress Report on the Second Ayrshire Local Flood Risk
Management Plan will help to demonstrate how the key priorities of 'protecting and
enhancing the environment for future generations' and providing ‘sustainable and
effective infrastructure’ are being achieved. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None.

Page 6

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The progress review has followed the guidance formulated and agreed by the Lead
Local Authority Forum to ensure that progress is reported in a consistent manner
throughout the country. Local authority flooding teams were consulted for their views
on the guidance prior to finalisation. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Gary Wilson, Senior Manager (Engineering
Services), on 01294 324810 . 
Background Papers
0

Page 7

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix 1: Review of North Ayrshire Council’s Community-Specific Flood Risk Management Measures (2022-2028)
Target Area. Action
ID.
Action Type. Original Anticipated
Delivery (2022).
RAG
Status
(2025).
Progress in Delivery,
including key deliverables
and dates.
Revised dates and planned
actions to complete /
address delay.
Irvine 2101 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available. 
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Irvine 2102 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.  
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.

Page 8

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Irvine 2104 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The outlets in the Waterside
flood embankment are
inspected and cleared when
required every month under
an existing North Ayrshire
Council framework contract. 
N/A
Irvine Coastal 2201 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The Irvine Beach Coastal
Management Study was
completed in 2025. 
N/A
Brodick 2301 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available.
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.

Page 9

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Brodick 2302 Community
engagement
Community engagement
will be ongoing, linked to
the design of the Brodick
Flood Protection Scheme.
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action. 
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Brodick 2303 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The first phase of the Natural
Flood Management Study for
Brodick was completed in
2025. A second phase will be
considered if there is
sufficient landowner interest. 
N/A
Lamlash 2401 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available. 
Red  As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.

Page 10

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Lamlash 2402 Community
engagement
Community engagement
will be ongoing, linked to
the design of the Brodick
Flood Protection Scheme.
Red  This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Lamlash 2403 Flood study This study will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green The first phase of the Natural
Flood Management Study for
Lamlash was completed in
2025. A second phase will be
considered if there is
sufficient landowner interest.
N/A
Lamlash 2404 Flood defence
maintenance 
Flood defence
maintenance   will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Lamlash are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A

Page 11

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Whiting Bay 2501 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Amber This study is now
programmed to start and be
complete in the second half
of the current flood risk
management planning cycle. 
Procurement options shall be
investigated to deliver the
study by the end of the
current flood risk
management planning cycle. 
Whiting Bay 2502 Flood defence
maintenance 
Flood defence
maintenance   will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Whiting are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections.
N/A
Dalry 7601 Flood scheme
or works
implementation
The Upper Garnock
Flood Protection Scheme
is under construction,
which will be completed
in the early part of Cycle
2.
Green. Construction of the Upper
Garnock Flood Protection
Scheme was completed in
2023.
N/A

Page 12

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Dalry 7602 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green.  The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances.
Community engagement shall
be carried out during the
second half of the flood risk
management planning cycle. 
N/A
Kilwinning
and
Dalgarven
8001 Surface water
management
plan 
This action will be
delivered during the
second half of Cycle 2
(2025 - 2028).
Green This work is programmed to
start and be completed in the
second half of the current
flood risk management
planning cycle.
N/A
Kilbirnie and
Glengarnock
9701 Flood scheme
or works
implementation
The Upper Garnock
Flood Protection Scheme
is under construction,
which will be completed
in the early part of Cycle
2.
Green Construction of the Upper
Garnock Flood Protection
Scheme was completed in
2023.
N/A

Page 13

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Kilbirnie and
Glengarnock
9702 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances.
Community engagement shall
be carried out during the
second half of the flood risk
management planning cycle. 
N/A
Kilbirnie and
Glengarnock
9703 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green The hydraulic model for the
upper R. Garnock was
updated in 2024 to take
account of the 2022 climate
change allowances. Using
this information, SEPA will
complete the recalibration of
the flood warning scheme by
the end of the current flood
risk management planning
cycle. 
N/A
Kilbirnie and
Glengarnock
9704 Flood
study (options
appraisal)
This study was completed
before the Local Flood
Risk Management Plan
was published in 2022.
Green.  The study is complete and
the actions have been
promoted on North Ayrshire
Council's website in order to
encourage uptake by
landowners. 
N/A

Page 14

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11901 Flood
scheme or
works design
(Mill Burn)
The detailed design of the
Mill Burn Flood Protection
Scheme will be
completed during the first
half of Cycle 2.
Construction is
programmed to begin in
2023/24.
Green The detailed design of the
Mill Burn Flood Protection
Scheme is complete and it is
anticipated that the main
construction contract will be
awarded in 2023.
N/A
Millport 11902 Flood scheme
or works
implementation
(Mill Burn)
This action shall be
delivered during Cycle 2
(2022-2028).
Construction is
programmed to begin in
2023/24.
Green The detailed design of the
Mill Burn Flood Protection
Scheme is complete and it is
anticipated that the main
construction contract will be
awarded in 2023.
N/A
Millport 11903 Community
engagement
(Mill Burn)
Community engagement
will be ongoing, linked to
the design and
implementation of the Mill
Burn Flood Protection
Scheme.
Green A community consultation
was completed in 2025 to
inform the construction
programme for the Mill Burn
Flood Protection Scheme. 
N/A

Page 15

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11904 Flood
scheme or
works design
(Millport
Coastal)
The flood scheme design
was completed prior to
the publication of this
Local Flood Risk
Management Plan.
Green The construction of the
Millport Coastal flood scheme
is complete. 
N/A
Millport 11905 Flood scheme
or works
implementation
(Millport
Coastal)
The delivery of the
Millport Coastal Flood
Protection Scheme shall
be completed in Cycle 2
(2022 - 2028).
Construction is
programmed to begin in
2022/23.
Green The construction of the flood
scheme is complete. 
N/A
Millport 11906 Community
engagement
(Millport
Coastal)
Community engagement
will be ongoing
throughout Cycle 2 (2022
- 2028) until the Millport
Flood Protection Scheme
has been implemented.
Green.  The construction of the flood
scheme is complete. 
N/A

Page 16

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Millport 11907 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Millport are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A
Saltcoats and
Stevenston
12101 Flood study This study will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green Hydraulic modelling of the
Stevenston Burn and the
Stanley Burn was completed
by North Ayrshire Council in
2025. An options appraisal
has been commissioned and
will be complete by the end of
the current flood risk
management planning cycle. 
N/A
Saltcoats and
Stevenston
12103 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Saltcoats are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan or are subject to regular
'T98' visual inspections. 
N/A

Page 17

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Largs north 14801 Flood
study (options
appraisal)
This action will be
delivered during the first
half of Cycle 2 (2022 -
2025).
Green A preferred option to modify
the formal Largs flood
scheme has been identified.
The future implementation is
being investigated. 
N/A
Largs north 14802 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Green The Largs wave overtopping
study is complete and further
community engagement
activities using the study
outputs will be undertaken
during the second half of the
current flood risk
management planning cycle. 
N/A
Largs north 14803 Flood defence
maintenance 
Flood defence
maintenance will be an
ongoing action
throughout Cycle 2 (2022
- 2028).
Green The coastal defences in
Largs are subject to a
programme of general and
principal inspections as part
of North Ayrshire Council's
roads asset management
plan. The Gogo Water flood
wall is visually inspected
every two years as part of the
programmed inspection of
watercourses. 
N/A

Page 18

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Fairlie 15501 Flood
scheme or
works design
The flood scheme design
shall be completed during
Cycle 2 (2022 - 2028).
The delivery of this action
is subject to Scottish
Government capital grant
funding being made
available.
Red As the funding arrangements
for Cycle 2 'flood scheme or
works design' actions has not
been confirmed, there has
been no progress on this
action. 
The revised completion date
for this action is uncertain; it
is dependent on the scheme
qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.
Fairlie 15502 Community
engagement
Community engagement
will be an ongoing action
throughout Cycle 2 (2022
- 2028).
Red This action is linked to a
'Cycle 2 flood scheme or
works design' action. As the
funding arrangements for
flood schemes has not been
confirmed, there has been no
progress on this action.  
The revised completion date
for this action is uncertain; it
depends on the linked 'flood
scheme or works design
action' qualifying for central
government funding pending
the ongoing review of current
flood scheme funding
arrangements by the
settlement distribution group.

Page 19

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix 2: Area-wide measures for all Responsible Flood Authorities in the Ayrshire
Local Plan District. 
Action type Action Description
Awareness Raising 
SEPA, the responsible authorities and other organisations such as
the Scottish Flood Forum work together through national and local
initiatives to help communities understand the risk of flooding and
what actions individuals can take. Improved awareness of flood risk
and actions that prepare individuals, homes and businesses for
flooding can reduce the overall impact of flooding. Local authorities
undertake additional awareness raising activities when developing
any specific project proposals and will engage with community
resilience groups and local communities. Scottish Flood Forum
support flood risk communities by raising community awareness,
promoting self-help, developing community groups and establish a
recovery support programme after a flood. Scottish Water will
provide targeted flooding communications for Scottish Water
specific activities and raise awareness by producing and supplying
targeted information to the public on large capital projects and
detailed local studies.
Data to support climate
resilience
As Scotland’s hydrometric authority, SEPA operates a network of
stations to measure river level, flow, rainfall, sea level, loch and
groundwater level. The data goes into a long term data archive and
is critical to underpin all flood risk management activities including
flood warning, flood mapping, design of flood protection and
sustainable development as well as supporting a range of
regulatory and recreational uses. SEPA will continue to maintain
and develop its hydrometric network, contribute to UK and
international data archives, and improve and update the datasets
used for flood frequency analysis. SEPA will support research and
development of data, methods and guidance to improve the
evidence on which decisions can be made, and to enable the
impact of climate change to be included in all flood risk
management activities.

Page 20

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Emergency plans
Many organisations, including local authorities, the emergency
services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil
Contingencies Act 2004 by Category 1 and 2 Responders and are
coordinated through regional and local resilience partnerships,
often supported by voluntary organisations. They set out the steps
to be taken to maximise safety and minimise impacts during
flooding. Emergency plans may also be prepared by individuals,
businesses, organisations or communities. Scottish Water is a
Category 2 responder under the Civil Contingencies Act 2004 and
will support regional and local resilience partnerships as required.
Flood forecasting
The Scottish Flood Forecasting Service is a partnership between
SEPA and the Met Office. The service continues to produce a daily,
national flood guidance statement, issued to emergency
responders, local authorities, and other organisations with flood
risk management duties. In 2022 a new 3-day daily Scottish Flood
Forecast was launched for the public. As the flood warning
authority for Scotland SEPA continues to provide its flood warning
service issuing flood alerts and warnings when required, giving
people a better chance of reducing the impact of flooding on their
home or business.
Flood warning
development
framework
SEPA published a new flood warning development framework in
2022, which details the ambition and strategic actions to maintain
and improve the flood warning service across Scotland. SEPA will
further develop phase 1 of the Scottish Flood Forecast based on
feedback gathered during public beta release before fully launching
the service to the public formally in early 2023. Phase 1 is the
national 3- day flood forecast and the starting point of our journey
in providing the public with earlier and improved flood information.
SEPA will continue to follow the service design approach for phase
2 of the Scottish Flood Forecast, which will provide the public with
more localised flood forecast information. User research will
determine what information will be displayed on the regional flood
forecast webpages. It is anticipated that the final service will bring
together all live information such as flood warnings, river levels and
rainfall data into a central hub that is easily accessible for the
public. Working in close partnership with the Met Office through the
Scottish Flood Forecasting Service, SEPA will develop its capability
in surface water flooding forecasting, focusing initially on the
transport sector to support climate-ready infrastructure. SEPA will
also undertake a prioritised improvement programme of existing
river and coastal flood warning schemes to provide more accurate
forecasting with improved lead time.

Page 21

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Future flood risk
management planning 
The years covered by the lifetime of this plan are crucial. Radical
progress is needed in how we reduce our impact on the climate
and respond to the effects of climate change. How we plan to
manage flooding to our communities is on the front line of the
challenges of this decade. The 2027 flood risk management plans
will be more ambitious than ever before. The plans will look to
develop long term plans for more flood resilient communities
prepared for the impacts of climate change. The priority areas
which will be the focus points of the next flood risk management
plans will be identified in 2024 with the designation of PVAs. A 3-
month public consultation will be held to inform the PVA
designation. We will plan for a better future by publishing our
flooding services strategy in 2023 with a clear and measurable
delivery plan. We will put greener, fairer communities at the heart
of our ambitions. SEPA has set its own target to be a regenerative
organisation by 2030 and the next set of plans will further this
ambition. During this plan cycle, SEPA will work to develop new
partnerships with a wider range of stakeholders, including
businesses and commercial sectors. We will investigate alternative
sources of finance to tackle flooding and drive forward practical
options for adaptation.
Guidance development
The Scottish Government and SEPA will develop and update
guidance to inform flood risk management projects. This guidance
will be produced in 2022 and will look at how best to adapt to the
long-term impacts of climate change and the most appropriate
methods of assessing the benefits of flood risk management
actions. Technical guidance to support flood risk management
partners will be reviewed and updated by SEPA where required.
Scottish Forestry, in collaboration with its UK counterparts,
published ‘Designing and managing forests and woodlands to
reduce flood risk: UK Forestry Standard Practice Guide’ in 2022.
Guidance will be developed to help local authorities understand the
requirements for mapping relevant bodies of water and sustainable
urban drainage systems in their areas.

Page 22

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Hazard mapping
updates
An understanding of flooding is essential to develop a plan led risk-
based approach to flood risk management. SEPA will continue to
update their national hazard mapping, which shows the likelihood
of flooding in Scotland from different flooding sources:
https://www.sepa.org.uk/environment/water/flooding/flood-maps/.
SEPA will continue to develop the hazard mapping viewer to make
it easier for the public, partners and stakeholders to access data on
the likelihood of flooding. SEPA will also review how modelling and
mapping updates are undertaken to develop a more effective
method of regional and national updates for the hazard maps.
Land use planning
Local authorities, SEPA and Scottish Water all have a responsibility
under the Flood Risk Management (Scotland) Act 2009 to support
sustainable flood risk management through the land use planning
process. National planning policies set out the Scottish Ministers’
priorities for the development and use of land. Under this
approach, new development in areas with medium to high
likelihood of flooding should generally be avoided. Current national
planning policies aim to restrict development within the floodplain
and limit exposure of new receptors to flood risk, promote flood
reduction via natural and structural flood management measures
and restoration of natural features, and avoid increased surface
water flooding through sustainable drainage and the minimisation
of impermeable surfaces. Locally determined planning policies may
place further requirements within their area of operation to restrict
inappropriate development and prevent unacceptable risk.
Maintenance 
Local authorities have a duty to assess bodies of water and to
carry out clearance and repair works where such works would
substantially reduce flood risk. Local authorities are also
responsible for the drainage of roads. In addition, local authorities
may also be responsible for maintenance of any existing flood
protection schemes or works. Scottish Water will continue to
undertake risk-based inspection, maintenance and repair on the
public sewer network. Asset owners and riparian landowners are
responsible for the maintenance and management of their own
assets including those which help to reduce flood risk.

Page 23

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Natural flood
management mapping 
SEPA will continue to support activities that improve our
understanding of how to effectively target and deliver natural flood
management. As part of this, SEPA will review and update the
opportunities mapping for natural flood management. This will
include linking blue-green infrastructure with the surrounding
natural catchment and coastline. Natural flood management seeks
to store or slow down flood waters through measures such as the
planting of woodlands, wetland creation, river restoration, or the
creation of intertidal habitats. In addition to flooding benefits,
natural flood management measures can also provide many
additional benefits to biodiversity, water quality, recreation, and
carbon storage.
National flood risk
assessment
SEPA will use the most suitable data to review and update the
national flood risk assessment (NFRA) undertaken in 2018. This
update will be used to identify future potentially vulnerable areas
and focus flood risk management planning.
National surface water
mapping
The national flood risk assessment 2018 identified that surface
water flooding has the potential to impact more properties in
Scotland than any other source of flooding. Over the next 6 year
cycle SEPA will look to vastly improve its national understanding of
surface flood risk by undertaking a wholescale update of the
national surface water maps to reflect developments in data and
understanding, including the impact of climate change.
Reservoirs 
SEPA will continue to develop its assessment of flood risk from
dam failure and use these assessments to direct a proportionate
regulatory approach to ensure reservoir safety. Over the next
management cycle we will implement further developments of our
flood warning capabilities in the unlikely event of reservoir failure.
Scottish Flood
Defence Asset
Database (SFDAD)
The Scottish Flood Defence Asset Database provides information
on existing flood protection schemes. National data on flood
protection infrastructure is needed to understand flood risk and to
develop adaptation planning for Scotland. SEPA will continue to
host SFDAD and look for opportunities to support the development
of our understanding of how and when Scotland’s flood defence
assets should be adapted to continue to maintain protection from
flooding in the future.

Page 24

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Self help
Everyone is responsible for protecting themselves and their
property from flooding. People can take steps to reduce damage
and disruption to their homes and businesses should flooding
happen. This includes preparing a flood plan and flood kit, installing
property flood resilience measures, signing up to Floodline,
engaging with their local flood group, and ensuring that properties
and businesses are insured against flood damage. The following
places offer help with taking steps to protect yourself:
https://www.floodre.co.uk/ https://www.biba.org.uk/current-
issues/flood-insurance/ https://floodlinescotland.org.uk/ 
https://scottishfloodforum.org/ 
Responsible authorities and SEPA will continue to develop the
understanding of flood risk to communities and promote measures
to help individuals and businesses to reduce their risk.