Page 1
AYRSHIRE SHARED SERVICE JOINT COMMITTEE 02 DECEMBER 2022 Report by the Head of Ayrshire Roads Alliance ______________________________________________________________ SUBJECT: ROADWORKS PROGRAMME 2022/23 ______________________________________________________________ PURPOSE OF REPORT 1. The purpose of this report is to advise the Joint Committee on the progress of work through the roads improvement programmes within East Ayrshire and South Ayrshire for financial year 2022-2023. RECOMMENDATIONS 2. It is recommended that Joint Committee: (i) Notes the Ayrshire Roads Alliance works completed 2022/23, (ii) Otherwise, notes the contents of this Report. BACKGROUND 3. The budget allocation for East and South Ayrshire Councils Roads Investment Programme for FY 2022/23 can be seen in tables 1 and 2 below respectively. Programme Area Budget (£m) Carriageway Resurfacing 5.125 Footway Resurfacing 0.250 Street Lighting 0.230 Traffic & Road Safety 0.315 Structures (Bridges & Culverts) 3.000 Cycling, Walking & Safer Routes 0.778 Smarter Choices, Smarter Places 0.187 Sustrans 0.100 SPT 2.270 SFT 0.060 Car Parks 1.583 School Streets 0.100 EV Charging 0.100 Other Works 0.080 Total 14.178 Table 1: East Ayrshire Council Roads Investment Programme 2022/23
Page 2
Programme Area Budget (£m) Carriageway & Footway Resurfacing 3.500 Structures (Bridges & Culverts) 0.840 Street Lighting 0.205 20mph Rural Villages 0.023 Traffic Signals 0.390 LED Replacement 0.232 Girvan Harbour 0.318 Slope Stabilisation 0.190 EV charging 0.100 Cycling, Walking & Safer Routes 0.718 Smarter Choices, Smarter Places 0.173 Sustrans 0.335 SFT 0.060 SPT 0.500 Regional Active Travel Fund (NEW) 0.065 STTS 0.148 Total 7.797 Table 2: South Ayrshire Council Roads Investment Programme 2022/23 DETAIL 4. The programmes for FY 22/23 are contained within Appendices One and Two. Resurfacing 5. As reported at the last Shared Services Committee on 4 November 2022, East Ayrshire Performs and South Ayrshire Members briefing all resurfacing programmes in East and South Ayrshire Council has been suspended pending further discussions with Finance colleagues in both authorities. 6. The road and footway network in East and South Ayrshire are safe and continues to be inspected by our Officers undertaking planned cyclic and reactive inspections. Major defects discovered will trigger an immediate response by Ayrshire Roads Alliance workforce to make good. 7. Our roads maintenance teams continue to undertake routine maintenance activities and are participating in winter treatment operations ensuring the network in both East and South Ayrshire are passable and safe. Street Lighting 8. Utilising our in-house electrical teams assisted by our appointed external Contractor, the focus is now on the installation of festive lighting and attending switch-on events in our communities ahead of Christmas period. 9. LED replacement programme continues with progress as detailed in Appendix 1 and 2.
Page 3
Electric Vehicle Infrastructure 10. The electric vehicle charging infrastructure programme has been included within Appendix three for South and East Ayrshire respectively, with the number of public chargers installed to date is included at Appendix 3. Work has been ongoing with SFT and Transport Scotland to explore public/private partnerships for public charging network. £120k has been awarded to ARA to develop a private public strategy with a draft being discussed internally for submission to SFT/TS upon on approval from both authorities. 11. The faulty New Cumnock charger has been installed and is to be commissioned within the coming weeks. Structures 12. Many of the bridge projects that we undertake require works to be undertaken within the watercourse and depending on what the works involve we often require a licence to be obtained. SEPA has 4 months to determine a licence application and they usually take this time. Other constraints, such as the fish spawning season which typically runs from end October to end April can also restrict when you can work in the watercourse. There are a number of projects ready for tender but will require to be held back until early 2023 before issuing tenders for a start in April/May 2023, outwith the fish spawning season. Where possible other projects that do not require in-stream working will be brought forward. 13. Land acquisition and/or access agreements are often required for bridge related projects and can cause delay to the projects. A number of projects are currently near tender ready but are being delayed due to land related issues. ARA are actively working with the Council’s Estates and Legal teams in all of these projects but land acquisition can be a very challenging and resource intense activity for ARA, Estates and Legal sections. Again, where possible, projects that do not require land acquisition or formal legal access agreements will be brought forward. 14. ARA representing South Ayrshire Council as a coastal authority participate as one of four Local Authorities on the Coastal Adaptation Budget Group which has representation from Scottish Government, Nature Scot, SEPA and Local Authorities. Guidance for the allocation of the £550,000 General Capital Grant to Local Authorities for 2023/24 has been developed and evaluation of the case studies submitted by Local Authorities is ongoing. South Ayrshire Council submitted a case study for Girvan Golf Course which utilises dredged material from Girvan Harbour and a case study for Ballantrae to better understand the coastal processes that are changing the beach and how to adapt for the future. The South Ayrshire Council case studies were submitted by South Ayrshire Council ‘Sustainability and Fleet’ supported by the Ayrshire Roads Alliance. 15. The East Ayrshire Performs – Summary Report presented to Cabinet on 9 November 2022 advised that the New Cumnock Flood Protection Scheme which is currently under construction had a projected shortfall in Council funding of
Page 4
£0.646m. The scheme is being funded by both the Scottish Government and the Council. Cabinet has approved the proposal that the shortfall be met from reallocation of current budget allocations within the overall EAC Bridges Capital programme. Traffic & Transportation 16. Agreement has been reached where necessary to roll grant funding provision into the new financial year to complete projects. The focus of these projects will continue to be improvements to our roads and infrastructure to improve journeys and increase safety measures where required. The Active Travel Strategy for East Ayrshire is currently undergoing a final public consultation review – as previously agreed at EAC Cabinet the final version of the Strategy can be signed off by the Leader and Cabinet Member for Roads without the need to return to a future Cabinet meeting. The Active Travel Strategy for South Ayrshire is finalised, and only requires an update of the Leader foreword prior to formal publication. 17. Road Safety Improvement Fund cross-boundary bid for £400,000 in total was originally submitted to Transport Scotland, however due to unforeseen delays the grant awards have not yet been issued. Transport Scotland have been back in contact to ask bidders to reconsider what may now be realistically deliverable between a grant award and 31st March 2023. We are currently in discussion with Transport Scotland over an amended cross-boundary bid of £220,000 consisting of proposals including the installation of pilot school gateway features at 2 x EAC schools, an antiskid surfacing scheme on the A713 in EAC, a speed activated signals trial in SAC, and a road safety enhancement scheme at a junction in SAC. At present we await feedback from Transport Scotland on our revised proposals. APSE - Performance Network Awards 18. The validation exercise has concluded and it has been indicated that both East and South Ayrshire are finalists in the 2022 Roads Highways and Winter Maintenance Category at the APSE Performance Network Awards Seminar to be held on Thursday 1st and 2nd December 2022 with the winners announced. 19. This prestigious performance networks awards is a high-profile occasion where both the best performing authorities and the most improved are awarded for their achievements. POLICY/COMMUNITY PLANNING ISSUES 20. A well -maintained road network will contribute to achieving the Community Plan objectives in relation to Economy & Skills and Safer Communities to maintain good access to our communities within East Ayrshire. 21. The matters referred to in this report contribute to the South Ayrshire Council strategic objective of ‘Enhanced Environment through Social, Cultural and Economic Activities’ and within that to the outcome of ‘Work with partners to
Page 5
improve roads and other infrastructure, to encourage house building and business investment that sustains local communities’ LEGAL IMPLICATIONS 22. By virtue of the relevant statutory provisions, principally detailed within the Roads (Scotland) Act 1984, the Council as local roads authority is required to manage and maintain all publicly adopted roads within its area other than those which are maintained and managed by the Scottish Ministers. HUMAN RESOURCES IMPLICATIONS 23. The work programmes have direct impact on human resources and the Alliance will ensure all works are suitably resourced to maintain satisfactory progress. EQUALITY IMPACT IMPLICATIONS 24. An equality impact assessment is not needed because the proposal does not have a differential impact on any of the protected characteristics. FINANCIAL IMPLICATIONS 25. The Ayrshire Roads Alliance will deliver the strategic and local services as stated in the Service Plan. The budget is provided by East Ayrshire Council, South Ayrshire Council, and other external organisations. Appropriate scrutiny arrangements are in place to manage these budgets. RISK IMPLICATIONS 26. The Ayrshire Roads Alliance Risk Register is reviewed and presented at every Joint Committee. 27. The Works Programmes, Service Plan and the Risk Register do not expose either Council to an increased risk as they have been developed from existing budgets and existing service commitment. TRANSFORMATION STRATEGY 28. This Report aligns with the following design principle stated in the “Transformation Strategy 2017-2022”. Maximum value for our communities; by ensuring the road network is maintained. BACKGROUND PAPERS East Ayrshire Council Cabinet Report – 2022/23 Roads Asset Management Plan – Investment and Programme - 16 March 2022 South Ayrshire Council Leadership Report Road Improvement Plan 2022/23 - 08 March 2022
Page 6
LIST OF APPENDICES Appendix 1 - South Ayrshire Council Programme of Works 2022/23 Appendix 2 - East Ayrshire Council Programme of Works 2022/23 Appendix 3 – EV Infrastructure Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance Tel No. 01563 503164 E-mail: kevin.braidwood@ayrshireroadsalliance.org Implementation Officer:Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance Tel No. 01563 503164 E-mail: kevin.braidwood@ayrshireroadsalliance.org
Page 7
Appendix 1 - South Ayrshire Council- Ayrshire Roads Alliance Carriageway Structural Maintenance Capital Programme over two years 2022/24 Works Carried Over From 2021 Route No Town Road Name Works Description Scheme Score Estimated Cost Comments Variance +/- Uncl Ayr Sannox View Full Length N/A £76,230 Complete +£43,376.62 Uncl Ayr Viewfield Road Full length N/A £58,905 Complete +£25,842.64 Uncl Ayr Hunters Avenue T Lights to Northfield N/A £129,150 Complete +£24,354.21 Uncl Prestwick Kyle Street Full length N/A £54,180 Complete +£7,829.69 Uncl Ayr Dalmilling Drive Full length N/A £71,904 Complete +£18,999.80 Uncl Ayr Taylor Street Full Length N/A £109,141 Complete +£3,925.00 Uncl Ayr Carrick Avenue Full Length N/A £100,947 Complete +£5,980.00 Uncl Ayr St Phillans Avenue Full Length N/A £222,755 Complete +£88,534.12 Uncl Ayr Southpark Road Full Length + fway works? N/A £125,364 Complete +£17,305.43 A719 By Maybole Maidens Ayr North of Humeston N/A £98,572 Complete +£20,722.00 B734 Old Dailly Barr Old Dailly Old Dailly to Penkill + N/A £108,000 On Hold
Page 8
drainage improvements B7035 By Girvan Glendoune Houdston Road (Coalpots) Braetoll South + S Power shut down N/A £100,500 On Hold Uncl Dailly Back Road Full Length N/A £107,646 Complete +£48,612.00 Uncl Girvan Carrick Street Full Length N/A £44,499 Complete +£20,501.00 Uncl Ayr Kersepark Footway Full length one side N/A £41,250 Complete -£7,738.00 Uncl Ayr Arthur Street Footway Full N/A £26,186 Complete -£5,428.00 B7023 Crosshill King Street Footway Shop side full length N/A £27,364 Complete -£7,414.00 C31 Crosshill Kirkmichael Road Footway By Community Centre N/A £8,250 Complete +£14,064.62 Uncl Girvan Hawthorn Drive Footway N/A £57,112 Complete +£2,292.92 Surface Dressing Works –Proposed 2023/24 U72 By Dundonald Crooks Full Length N/A 23/24 U99 By Symington Dundonald Symington C32 to U98 Corraith N/A 23/24 C115 By Tarbolton Parkmill Road Parkmill to C114 N/A 23/24 C114 By Tarbolton Largie Road 2 sections N/A 23/24 B744 By Tarbolton Tarbolton/Crosshands C114 to Auchinweet N/A 23/24 C74 By Ayr Macnairston Road Macnairston to Lochfergus N/A 23/24 C122 By Minishant School Road Full Length N/A 23/24
Page 9
C60 By Maybole Ladycross Full Length N/A 23/24 C39 By Ayr Corton Road A77 to Equestrian Centre N/A 23/24 C29 By Maybole North Water of Girvan - Maybole Road 30 mph Maybole south to U3 N/A U2 By Maybole Auchencross C29 to Railway Bridge N/A 23/24 U25 By Dailly Delamford B741 to Hadyard Hill N/A 23/24 U56 Girvan Golf Course Road Newton Kennedy Br. to Knockvalley Cottages N/A 23/24 C102 By Kirkoswald Balvaird Full Length N/A 23/24 Carriageway Resurfacing Works 2022/24 A719 By Tarbolton Failtoll Crossroads By Lilylaw Farm N/A £173,875 Complete +£47,888.92 A759 Dundonald Bypass Road, Dundonald Auchans to Palmer Mount 61 £219,000 Complete +£35,384.70 B730 By Symington B730 Tarbolton/Dundonald Dankeith to B751 Junction 53 £158,763 Complete +£142,740.92 B730 By Dundonald B730 Bogend/A77(T) - Tarbolton Slough Bridge to Tarbolton 53 £265,500 Complete Final Measure
Page 10
Road/Dundonald, Dundonald Road Dundonald C92(C8) By Craigie Plewlands Road Full Length incl part C8 to A719 47 £139,040 Complete -£29,295.00 Uncl Troon Queens Drive Full Length 42 £35,640 Complete +£17,060.84 B744 By Tarbolton B744 Garden Street/Tarbolton - Council Boundary, Tarbolton From Barrmuirhill east to Auchinweet 69 £159,000 Complete -£46,545.81 B743 By Mossblown Ayr / Mossblown? West from Brocklehill Farm 53 £271,250 On Hold C115 By Tarbolton C115 Montgomerie Street/Tarbolton - C114 Jcn Sw Of Barhill, Mauchline From Fail Bridge westwards 50 £123,200 Complete -£42,251.34 C37 Auchincruive Barrackhall Gibbsyard TBC 48 £134,400 On Hold Uncl Ayr Saltpans Road North from Glebe Road 46 £48,750 On Hold Uncl Tarbolton Springfield Road Garden Street to No 50 46 £35,200 On Hold Uncl Prestwick Morris Road Full Road 43 £34,320 On Hold Uncl Ayr Green Street Waggon Road to Crown Street 42 £67,760 On Hold Uncl Prestwick Craigie Street Full length 39 £11,638 On Hold C74 By Ayr Macnairston Road C105 to B742 Junction 52 £92,960 On Hold B744 By Annbank B744 Jcn At B742 N Of Annbank - B743, Annbank from B743 junction 63 £120,000 Complete -£48,811.86
Page 11
south- westwards B742 By Coylton B742 Council Boundary - A70/Hillhead, Coylton By Holebogs, S bend 59 £45,000 On Hold B742 By Coylton B742 Council Boundary - A70/Hillhead, Coylton From A70 at Hillhead south to C21 Craigs Road junction 56 £57,000 On Hold B744 Annbank Weston Avenue Craighall Way to 101 Weston Avenue 56 £70,875 On Hold B742 By Coylton B742 A70 Hillhead - B744 Jcn N Of Annbank, Coylton From Meadowhead Depot entrance south-wards 55 £97,500 On Hold B744 Annbank Weston Brae Full Length 53 £58,125 On Hold B744 Annbank Browns Crescent Full Length 53 £28,125 On Hold B742 By Coylton B742 A70 Hillhead - B744 Jcn N Of Annbank, Coylton Bridge of Coyle to C2 52 £190,500 On Hold B744 By Annbank B744 Belston/A70 - Weston Avenue/Annbank, Ayr Auchincruive Junction to Glenview 52 £91,250 On Hold U77 By Coylton Hole Road Full Length 46 £43,360 On Hold Uncl Ayr Ellisland Square Full Length 42 £58,806 On Hold Uncl Ayr Chapel Park Road Full Length 40 £53,319 On Hold
Page 12
B742 By Maybole B742 Jcn Of A77(T) Ne Of Maybole - Council Boundary S Of Dalrymple, Maybole From B7045 junction westwards N/A £66,845 On Hold A719 By Dunure A719 Smithy Bridge/Dunure - Croy Brae, Dunure By Humeston, Castlehill woods to Pennyglen 70 £93,800 On Hold A719 By Dunure A719 Smithy Bridge/Dunure - Croy Brae, Dunure Cemetery to Drumshang 67 £182,000 On Hold A719 By Maidens A719 Pennyglen/B7023 - Kirkoswald Road/Maidens, Maidens Morriston Farm to Jct Blawearie 56 £186,000 On Hold A719 By Maidens A719 Turnberry Road/Maidens - Maidens Road/Maidens, Turnberry Maidens to Turnberry 56 £232,500 On Hold A719 By Maidens Maidens, Ayr North of Humeston Turnberry £140,000 Complete +£20,722.00 B7023 Maybole Crosshill Road Full Length 56 £56,250 On Hold B7023 Maybole St Cuthbert's Road Full Length 53 £28,125 On Hold B7024 Maybole Alloway Road Redbrae to Bypass 51 £71,250 On Hold C122 By Maybole C122 Gardenrose Path/Maybole - School School to new Bypass 50 £18,150 On Hold
Page 13
Road/Minishant, Maybole C122 By Maybole C122 Gardenrose Path/Maybole - School Road/Minishant, Maybole Ladycross to new Bypass 50 £24,192 On Hold B7023 Maybole Crosshill Road Full Length 56 £56,250 On Hold B7023 Maybole Maybole Crosshill 30mph Maybole to jcn C58 72 £323,840 On Hold A714 (STTS) Barrhill Main Street Full Length 61 £148,800 On Hold B7027 Barrhill Knowe road Jcn A714 to Dusk mill area. 58 £53,808 Complete +£27,277.00 B741 Dailly Girvan/Dailly Bargany 55 £105,840 Complete +£80,649.84 C29 Maybole North Water of Girvan/Maybole Road Wallacetown to Ruglen various locations 55 £136,125 Complete -£1,222.12 U52 Pinwherry Muck road Various TBC 52 £76,800 On Hold C45 Ballantrae Heronsford Road A77- Laggan 48 £56,840 On Hold U6 By Ballantrae Balkissock Full length 44 £101,482 Complete +£3,113.35 Footway Resurfacing Works 2022/24 Uncl Troon Fullarton Drive No 19 to No 37 30 £16,500 On Hold
Page 14
B730 Dundonald Drybridge Road Bowling Green to Kilnford Dr 28 £14,500 On Hold B730 Dundonald Drybridge Road Kilnford Drive to A759 28 £33,600 On Hold C492 Troon Bentinck Drive No 97 to No 121 28 £20,000 On Hold Uncl Prestwick Outdale Avenue F/path Sherwood Road side , both sides 30 £38,300 On Hold C17 Tarbolton Westport Footway North side 28 £17,370 On Hold B743 Mossblown Mauchline Road Fourways to Railway Bridge North side 28 £15,300 On Hold Uncl Ayr Content Avenue South Side full length (College Side) 28 £8,400 On Hold Uncl Mossblown Martin Avenue 28 £15,300 On Hold Uncl Prestwick Hunters Avenue South from Heathfield Road, west side 23 £7,500 On Hold Uncl Ayr Bellevue Crescent 34 £37,800 On Hold Uncl Ayr Hawthorn Drive 30 £62,000 On Hold B742 Annbank Weston Brae 28 £10,700 On Hold Uncl Maidens Ardlochan Road 30 £20,000 On Hold Uncl Maybole Hicks Avenue No 2 to No 94 30 £28,980 On Hold
Page 15
Uncl Maybole Queens Terrace No 17 to No 39 + cway see separate entry 28 £18,000 On Hold Uncl Maybole Kingcraig Avenue No 2 to No 32 + cway see separate entry 28 £22,800 On Hold Uncl Ayr Lochpark slab replacement 23 £20,425 On Hold C151 Dailly Woodside Both sides from Back St and Hadyard Terr 30 £20,400 On Hold Uncl Dailly Church Crescent Odd number side full length 30 £16,000 On Hold Uncl Crosshill Newton Street Church Side of road 30 £15,795 On Hold Uncl Dailly Hadyard Terrace Inside footway + part outer section 28 £54,400 On Hold TOTAL £6,928,827
Page 16
South Ayrshire Council- Ayrshire Roads Alliance Lighting Programme 2022/23 Town Location Work Type No of columns Estimated Programme Cost Comments Variance +/- Ayr James Street and Area Carry forward from 2021/22 30 £62k On Site Ayr Auchendoon Crescent and various Service Roads No existing lighting 7 £17k On Site Ayr Dalmilling Road (Phase 2) 5th Core supplies 9 £15k programmed Ayr Sannox Road & Place (Phase 2) 5th Core supplies 8 £20k programmed Maybole Greenside (Phase 2) Concrete columns 9 £20k Complete Final Measure Prestwick Mossbank Old steel columns and 5th Core supplies (ongoing section faults) 24 £50k Complete Final Measure Troon Barassiebank Lane (part), Muir Dr and Wallace Dr Concrete columns 14 £30k Complete Final Measure £214k South Ayrshire Council- Ayrshire Roads Alliance LED Lighting Programme 2022/23 Town Description Remaining Ayr, Dundonald and Prestwick - 28
Page 17
South Ayrshire Council- Ayrshire Roads Alliance Traffic and Transportation Programme 2022/23 Calculated Funding Totals Sub-Bid Match Detail Total Bids Project Description Comments Variance +/- SPT £39,000 Match £500,000 Access for All Review Coylton £400,000 Match Alloway to Burton Construction Contractor appointed £11,000 Match Dundonald to Barassie Link Ph1 Construction Design £50,000 No Match SQP Various Projects Design Sustrans – Places for Everyone £114,926 Match £335,197 Access for All Review Coylton Awaiting confirmation of land acquisition £111,271 Match Alloway to Burton Construction Contractor appointed £109,000 Match Dundonald to Barassie Link Ph1 Construction Awaiting confirmation of land acquisition £0 No Match Loans to Troon Railway Station (Phase 3) Awaiting confirmation on £56k bid Regional Active Travel Fund (NEW) £65,000 Match £65,000 Alloway to Burton Construction Contractor appointed
Page 18
Calculated Funding Totals Sub-Bid Match Detail Total Bids Project Description Comments Variance +/- Sustrans – Cycle Shelter Fund £0 Direct Match £0 School Cycle Shelters Schools now require to bid to fund directly SCSP £173,150 Hub Match £173,150 Active Travel Hub Ayr Ongoing Project delivery SAC in Kind £0.00 - Active Travel Hub Ayr CWSR £100,000 Match £718,057 Access for All Review Coylton £423,729 Match Alloway to Burton Construction Contractor appointed £40,000 Match Signalisation B746 Kilmarnock Rd/Lang Rd/Commonwealt h Dr Junction Works Complete Final Measure £44,328 Match Dundonald to Barassie Link Ph1 Construction Scheme Design £45,000 Hub Match New crossing feature – Dalmilling Drive, Ayr £30,000 Hub Match New speed reduction schemes on key walking routes, Ayr
Page 19
Calculated Funding Totals Sub-Bid Match Detail Total Bids Project Description Comments Variance +/- £30,000 Hub Match New cycle parking facilities – various locations £5,000 Hub Match New bike repair stations – locations TBC Developer Contribution £100,000 Match £100,000 Signalisation B746 Kilmarnock Rd/Lang Rd/Commonwealt h Dr Junction Works Complete Final Measure Total £1,891,404 ARA New Signals £160,000 Match £160,000 Signalisation B746 Kilmarnock Rd/Lang Rd/Commonwealt h Dr Junction Works Complete Final Measure Total £2,051,404
Page 20
South Ayrshire Council-Ayrshire Roads Alliance Traffic and Transportation Signal Replacement 2022/23 Signal No Town Description Work Type Estimated Programmed Cost Comments Variance +/- SAS 15 Ayr Castlehill Rd/Chalmers Rd Junction Replacement £40,000 Design complete to be programmed SA59 Ayr Whitletts Road/Craigie Rd Junction Replacement £50,000 Design complete to be programmed SA17 Ayr Whitletts Rd/Mainholm Rd Junction Replacement £45,000 Design complete to be programmed SAP1 Ayr Holmston Rd Pedestrian Crossing Replacement £0 Works carried forward to 2023/24 Total £190,000 South Ayrshire Council - Ayrshire Roads Alliance Structures Capital Programme 2022/23 Description Work Type Estimated Programme Cost Comments Variance +/- A79-30 Victoria Bridge Joint Replacement and waterproofing £300,000 On Site A79-30 Victoria Bridge Concrete Repairs and Painting £490,571 On site £790,571
Page 21
Appendix 2 East Ayrshire Carriageway Structural Maintenance Programme 2022/23 ROAD LOCATION Estimated Cost Cost to Date variance +/- Comment South of Hollybush and A713 Polnessan to Patna £318,750.00 £266,500.00 -£52,250.00 Complete A71 Main Street Darvel £121,875.00 On Hold A70 Lugar Water Bridge to East Gateway and Carbello £234,375.00 £254,375.00 +£20,000.00 Complete A719 Moscow and Rural Sections £262,500.00 £381,000.00 +£118,500.00 Complete A735 U26 to past C7 Junction £159,375.00 On Hold B743 Strathaven Road Muirkirk 950m to South Lanarkshire Boundary £98,800.00 On Hold B7036 Barony Road Near Egger factory Entrance £93,750.00 Cancelled C134 Rural Sections £51,200.00 On Hold C50 Ochiltree Various sections £89,600.00 Complete C6 Stewarton Various sections £89,600.00 £50,000.00 -£39,600.00 Complete C22 Coal Road, From U730 to A70 £592,000.00 £380,476.00 -£211,524.00 Complete C23 Rigg Road and from U730 to Railway Bridge U730 Glenshamrock Road from B705 to C23 U1 GalstonMoor Road U56 to A71 £160,000.00 £50,000.00 -£110,000.00 Complete U760 Dalcairnie Full Length £116,480.00 On Hold U26 Dunlop Full Length £48,000.00 On Hold U729 Glenmuir Road Logan Avenue to Loganhill Road £20,000.00 £55,701.00 +£35,701.00 Complete Ellis Street Kilmarnock Full Length £16,800.00 On Hold Howard Street Kilmarnock Full Length £71,400.00 On Hold Seaford Street Kilmarnock Full Length £112,200.00 On Hold Dundonald Road Kilmarnock Smillie Place to Seaford Street £123,200.00 On Hold
Page 22
Witchknowe Road Kilmarnock New Street to Witchknowe Avenue £9,350.00 Completed last financial year Meiklewood Road Kilmarnock No1 to No 31 £28,050.00 On Hold Shortlees Crescent Kilmarnock Rathlin Avenue to Shortlees Road £37,400.00 On Hold Old Street Kilmarnock Academy Street to Campbell St £32,130.00 On Hold Kinlock Road Kilmarnock Full Length £36,371.50 On Hold Stoneyhill Avenue Kilmarnock Full Length £18,700.00 On Hold Turner Place Kilmarnock Full Length £27,200.00 On Hold Craufurdland Road Kilmarnock No87 to No145 £20,400.00 On Hold Old Mill Road kilmarnock Lawson Street to Saturrock Street £52,800.00 On Hold Grassyards Road Kilmarnock Kennedy Drive to C10 £52,800.00 On Hold Mansfield Road New Cumnock A76 to Top Corner/ Junction £255,200.00 On Hold Loch View New Cumnock Full Length £32,725.00 £42,000.00 +£9,275.00 Complete Mill of Shield Drongan B730 to Drumwhill Road and £93,500.00 £209,130.00 +£115,630.00 Complete Glencraig Street Drongan Lane Crescent to Hannaston Avenue Blaney Avenue Patna Full Length £28,050.00 On Hold Wallace Street Galston B7037 to Cross Titchfield Street Galston Standalane to Orchard Street £74,460.00 £142,468.00 +£68,008.00 Complete Henrieta St Galston Various Sections Cessnock Road Hurlford, Craigie Road Hurlford and Full Lengths £172,975.00 £319,388.00 +£146,413.00 Complete
Page 23
Blair Avenue Hurlford Crougar Road Crookedholm Full Length £58,905.00 On Hold Meadowside Crookedholm Full Length £6,375.00 On Hold High Street Newmilns Full Length £38,250.00 On Hold East Donnington Street Darvel Full Length £30,600.00 On Hold Burn Road Darvel Various Sections £74,800.00 On Hold Campbell Street Darvel Full Length £28,050.00 On Hold Patterson Terrace Darvel Full Length £21,505.00 On Hold Fleming Drive Stewarton Full Length £11,874.50 On Hold Lothian Road Stewarton Full Length £46,750.00 On Hold Victoria Way Stewarton Full Length £13,090.00 On Hold Cutsburn Road Stewarton Full Length £74,800.00 On Hold Irvine Road Kilmaurs Full Length £21,505.00 On Hold Newmill Road Dunlop Full Length £76,500.00 On Hold Middlefield Drive Muirkirk Full Length £14,450.00 On Hold Poole Avenue Ochiltree Full Length Broom Cresent Ochiltree Remaining Length £31,450.00 £65,000.00 +£33,550.00 Complete Douglas Brown Avenue Ochiltree Full Length Dalgleish Avenue Cumnock Full Length £26,350.00 Final Measure Complete McLymont Court Cumnock Full Length £24,480.00 Final Measure Complete
Page 24
Holland Crescent Cumnock Full Length £47,600.00 Final Measure Complete Tanyard Car Park Cumnock Full Car Park £70,400.00 Final Measure Complete Ayr Road Car Park Cumnock Full Car Park £79,200.00 To be Programmed Elizabeth Crescent Cumnock Full Lengths £61,200.00 £80,379.00 +£19,179.00 Complete Gemmel Avenue Cumnock C3 Barsminning Road Mauchline From Rail Bridge to U742 Mosshead Road £17,820.00 £59554.00 +£41,734.00 Complete Hughfield Road Mauchline Full Length £55,500.00 On Hold Carrick View Mauchline Full Length £41,250.00 On Hold Beechwood Road Mauchline Full Length £69,500.00 On Hold Jean Armour Drive Mauchline Full Length £112,500.00 On Hold Cairn Road Cumnock Various Sections £103,950.00 £140,138.66 +£36,188.66 Complete Park Crescent Dalmellington Full Length £62,370.00 Complete Main Street Dalmellington Full Length £40,040.00 Ongoing
Page 25
Appendix 2 East Ayrshire Footway Structural Maintenance Programme 2022/23 Section Street Name Location Environment Footway Material Length Average Width Treatment Area Cost New Cumnock Loch View Full Length Both Sides Residential Bituminous 300 2 New PCC Kerbs, reconstruct, HRA 600 £22,800 Patna Blaney Avenue No12 to Main Street Residential Bituminous 144 3.25 New PCC Kerbs, reconstruct, HRA 468 £14,976 Dalmellington Broomknowe No 33 to Gateside Road Residential Bituminous 106 1.8 New PCC Kerbs, reconstruct, HRA 191 £6,106 Ochiltree Broom Crescent No1 to Gallowlee Avenue Residential Bituminous 215 1.8 New PCC Kerbs, reconstruct, HRA 387 £12,384 Ochiltree Mill Street Coachhouse to A70 Residential Bituminous 200 2 New PCC Kerbs, reconstruct, HRA 400 £12,800 Kilmarnock Riverbank Place No3 to No 19 Residential Bituminous 50 1.8 New PCC Kerbs, reconstruct, HRA 90 £2,880 Kilmarnock Western Road Various Sections Residential PCC Slabs 970 2 New PCC Kerbs, reconstruct, HRA 1940 £62,080 Kilmarnock Sannox Road No1 to No31 Residential Granolithic 140 2 New PCC Kerbs, 280 £8,960
Page 26
reconstruct, HRA Darvel Burn Road A71 to West Donington Street Residential Granolithic 70 1.8 New PCC Kerbs, reconstruct, HRA 126 £4,032 Darvel Ranolcoup Road A71 to Mair's Road Residential Granolithic 50 1.8 New PCC Kerbs, reconstruct, HRA 90 £2,880 Cumnock Hearth Road/Hearth Road Car Rd to Emry's Avenue Residential Bituminous 420 1.8 New PCC Kerbs, reconstruct, HRA 756 £24,192 Auchinleck Barbieston Road Talbot Drive to Church Street Residential Bituminous 320 1.8 New PCC Kerbs, reconstruct, HRA 576 £18,432 Kilmaurs Sunnyside B751 to Yardside Residential Bituminous 175 2 New PCC Kerbs, reconstruct, HRA 350 £11,200 Stewarton Merrygreen Place Full Length One Side Residential Bituminous 450 1.8 New PCC Kerbs, reconstruct, HRA 810 £25,920 Stewarton Holm Street One Section Residential Bituminous 40 2 New PCC Kerbs, reconstruct, HRA 80 £2,560 Drongan Watson Terrace From Cul- De- Sac to Taiglum Place Residential Bituminous 70 1.8 New PCC Kerbs, reconstruct, HRA 126 £4,032 Drongan Taiglum Place Watson Terrace to lane Residential Bituminous 75 1.8 New PCC Kerbs, reconstruct, 135 £4,320
Page 27
Crescent HRA Crosshouse Kilmarnock Road Playingfield Road to Gatehead Road Residential Bituminous 140 1.2 New PCC Kerbs, reconstruct, HRA 168 £5,376 £245,930
Page 28
APPENDIX 2: Environmental Improvement Programme Year Project Description of Works Benefit Estimated Cost 2020/21 Hayhill, by Drongan, Environmental Improvement Kerb, upgrade verge and form parking bay Improve environment in village and road safety by formalising parking area. £15,000 2021/22 Craigie Avenue, Kilmarnock Form Lay-by - street parking bays Improve environment and road safety by reducing on street parking problems. £15,000 Future Years Wellpark Crescent Kilmarnock, widen road. Re-kerb and widen over- run grassed area Improve environment and road safety by reducing on street parking problems. £7,000 Future Years Kilmarnock Rd Service Rd Crosshouse, widen road. Re-kerb and widen over- run grassed area Improve environment and road safety by reducing on street parking problems. £8,000 Future Years Hillcrest, Bellsbank, Dalmellington Parking Bays Form 6 No Off-Street parking bays Improve environment and safety by reducing on street parking problems. £15,000 Future Years North Hamilton Place Kilmarnock, parking bays. Additional Parking Area Improve environment and road safety by reducing on street parking problems. £8,000 Future Years Gateside Road, Galston, widen road. Re-kerb and widen over- run grassed area Improve environment and road safety by reducing on street parking problems. £7,000
Page 29
Appendix 2 Street Lighting Works Programme 2022/23 East Ayrshire Lighting Capital Programme 2022/23 Town Location Work Type Estimated C/F Cost Comments Variance +/- Dalrymple Church Street Area Carry forward from 2021/22 £45k Complete Final Measure Kilmarnock Lomond Road Area Carry forward from 2021/22 £15k Complete Final Measure Darvel Glen Cres and Hutchison Dr Carry forward from 2021/22 £45k Not issued £105k Town Location Work Type Estimated Programme Cost Comments Variance +/- Hurlford Sherwood Road, Liffnock Avenue, Cessnock Ave, Cessnock Drive, Cessnock Rd 5th Core supplies and concrete columns £90k 95% Complete Kilmarnock Ayr Road, Service Road 5th Core supplies and concrete columns £30k 90% Complete Muirkirk Pagan Walk, Stoneyhill Avenue, Wardlaw Ave and Hawkshaw Terrace 5th Core supplies and concrete columns £70k Complete Final Measure Dalrymple Barbieston Rd and Cedar Terrace 5th Core supplies and concrete columns £40k 80% Complete £214k
Page 30
East Ayrshire LED Lighting Programme Update 2022/23 Town Lantern Amount Status Lantern Tender Delivery / start install Install complete by New Cumnock & Dalmellington 766 Complete Patna & Dalrymple 563 Complete Mauchline,Sorn & Catrine 957 Complete Ochiltree & Drongan 562 Complete Auchinleck & Cumnock 1535 Complete Irvine Valley (including Hurlford & Crookedholm) 1860 Complete Kilmarnock South (including Crosshouse, Gatehead & Knockentiber) 2300 Complete Kilmarnock - North East 1135 Lightways Contractor – started Feb 2022 July-Aug 21 Dec-21 95% Complete Kilmarnock - North West 1850 Complete Kilmarnock - Central 1400 On site Mar-23 East Ayrshire - Decorative 350 75% complete tender to be issued for next stage Dec-22 Logan, Lugar, Cronberry & Muirkirk 390 20% Complete Lightways Contractors started Oct-22 Feb-23 Stewarton, Kilmaurs, Fenwick, Dunlop & Lugton 1420 20% Complete Lightways Contractors started Oct-22 Feb-23 Current Status Programme completed conversions to date 12,096 Replacement programme 80.2% complete Overall LED units completed 17,680 LEDs now 85.5% of total EAC inventory
Page 31
East Ayrshire LED Programme Funded Replacement Works During our design works for our LED conversions, we have identified a number of older installations in East Ayrshire where it is not practicable to simply replace the existing discharge lighting with LED lanterns. Consequently, the following full lighting replacement projects have been programmed and will be funded from the LED replacement budget. Town Location Estimated Cost Scheduled Comments Fenwick Glebe Terrace, Fenwick £20k Nov-22 Awarded Galston Orchard Street, Galston £35k Nov-22 Awarded Kilmarnock Ellisland Drive Area, Kilmarnock £45k Nov-22 Awarded Hurlford Riccarton Road Service Road, Hurlford £25k Dec-22 At design stage Kilmarnock Samson Ave, Linfern Ave Areas, Kilmarnock £95k Jan-23 At design stage Stewarton Clerkland Road Area, Stewarton £70k Jan-23 At design stage Kilmarnock Glasgow Road B7038, Kilmarnock £70k Feb-23 At design stage Kilmarnock Forest Grove and Woodlands Grove, Kilmarnock £85k Feb-23 At design stage Kilmarnock Gibson St and Carmel Ave Areas, Kilmarnock £110k Mar-23 Kilmarnock Wilson Ave, Greenan Rd, Dunure Rd Area, Kilmarnock £120k Mar-23 2022/23 Total £675k Town Location Estimated Cost Scheduled Comments Kilmarnock Woodstock Street Area, Kilmarnock £50k Apr-23 Stewarton Annick Crescent Area, Stewarton £75k Apr-23 Fenwick Maunsheugh Road, Fenwick £50k May-23 Fenwick Skernieland Road, Fenwick £30k May-23 2023/24 Total £205k
Page 32
APPENDIX 2: Bridge and Culvert Strengthening Programme Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status Bridge Strengthening and Replacement U22/10 Burnfoot Bridge, near Darvel Replacement – Near tender ready. Land acquisition outstanding £444,000 Ground Investigation completed. Land acquisition reqd. SEPA CAR Licence received Design & tender docs C127/10 Low Ashyard Bridge Infilling of bridge by Historical Railways Estate. EAC part contribution £5,000 HRE has funded the installation of temporary supports and working up design to sleeve the structure Programmed Funding discussions ongoing with HRE U26/10 West Clerkland Bridge, near Stewarton Replacement – currently closed to traffic; near tender ready. CPO required to obtain land acquisition. Construction likely to be in future year programme £12,000 Land acquisition stalled due to landowner. CPO reqd. Bridge completely closed to veh & peds. With Legal to undertake CPO. Tender ready B730/10 Littlemill Bridge, near Rankinston Replacement - near tender ready; land acquisition to be concluded; construction likely to be in future year programme £6,000 Land acquisition near complete. Advance electricity diversion complete. Near Tender ready. Works in 2023/24 A71/280/C8 0 Mathews Burn Culvert, West Donnington St, Darvel Replace section of culvert below West Donnington Street; design on going and near tender ready, land acquisition to be concluded. £5,000 £144,000 SEPA Licence obtained. Land acquisition near complete Design/Tender
Page 33
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status B713 B713 Road Slip south of Sorn Detailed design and construct sheet piled wall £312,000 Consultant working up detailed design & tender documents Design/tender B705 B705 Road Slip centre of Catrine Detailed design £18,000 No progress B705 B705 Road Slip north of Catrine Detailed design £18,000 No progress Various Investigative works Topographical surveys, paint surveys, etc £6,000 Package of topos awarded C108/00/C4 4 Gateside Farm Culvert Replacement with box culvert units – contract awarded – start March 2022 Completion end of May £102,000 Complete Complete A735/130/C 58 Gills Burn Culvert, Dunlop Part deck replacement and Retaining Wall Repairs - design in 2022/23 and construction in future year programme £10,000 On hold (as part of F&PM wider ECC build) U45/10 Kirkland Bridge, Springside Replacement of boundary bridge - North Ayrshire Council is lead authority. East Ayrshire Council funding 50% in 2022/23 £54,000 Complete Complete U751/10 Crossflats Bridge Replacement – design by consultant £60,000 No progress Consultant to be appointed for design via SXL U760/00/C93 Glenhead Culvert Replacement £42,000 No progress
Page 34
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status U740/10 Barbieston Bridge Boundary Bridge Replacement – design by consultant £24,000 No progress Cessnock Ave, Hurlford Retaining Wall replacement works on site. £36,000 98% Complete 98% Complete U44/10 Bruntland Bridge Strengthen and refurbish £24,000 No progress Upgrade Works identified from inspections B705/10/C 91 Cowan Place Culvert, Catrine Masonry repairs/scour repairs £24,000 Site visit undertaken and preliminary design Preliminary design B705/20 Shellies Bridge, Catrine Scour repairs; masonry training wall repairs and culvert extension – Consultant appointed to undertake design & works ongoing; land acquisition required. Construction in future year programme £6,000 Consultant design ongoing. Land acquisition to be determined Design A71/300 Priestland Bridge Retaining Wall strengthening – finalise design, conclude land acquisition/servitude and construct.Tender evaluation. £120,000 Works ongoing Site U764/10 Glenmuir Bridge Scour repairs £42,000 No progress A70/130/W 31 Thornwood Wall, Lugar Replacement - Consultant appointed to undertake design which is ongoing; land acquisition required. Construction in future year programme £6,000 Consultant design ongoing and site investigation complete. Sheet pile option developed but conflict with O/H power cables being investigated Design Queens Crescent, Newmilns Replace riverbank retaining wall.tender being evaluated. £325,000 Tender delayed until Spring 2023 due to fish spawning issues with river working Tender ready
Page 35
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status Galston to Newmilns Cyclepath River realignment works – additional rock armour works.Works Complete £72,000 Complete Complete B741 Coal Glen Embankment Slip, near Dalmellington Ground investigation complete. Consultant finalizing design & tender package. Land acquisition required. Construction potentially in 2022/23. £24,000 £360,000 Near tender ready Design A713/60/C 61 Polnessan Upper Bridge Extension of culvert. Design and land acquisition in 2022/23. Construction in future year programme. £24,000 No progress C90/35/CG 02 Cattle Grid Replacement of cattle grid and bypass improvement.. Tender ready. Est £30,000 Funded by WF developer Tender issue imminent Tender ready A736/60/C 84 Lochridge Culvert Masonry and drainage repairs £60,000 Near ready for tender issue Design F/LUGA/10 Logan to Park Terrace Footbridge, Lugar Replacement of footbridge deck.on refurbished abutments. Consultant design ongoing £150,000 Deck replacement and scour protection ongoing Design B705/20/C 68 Smithy’s Culvert, near Catrine Replace with box units - future year programme No progress B741/40/C 79 Polmathburn Bridge, near Dalmellington Replace damaged deck slabs - future year programme No progress A71 Dundonald Rd Bridge Refurbish – replace expansion joints, waterproofing, drainage, surfacing – design. Construction in future year programme. £36,000 Consultant appointed and design ongoing Design
Page 36
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status A71 Riccarton Viaduct Refurbish – paint, replace expansion joints, waterproofing, drainage, surfacing – design. Construction in future year programme. £36,000 Consultant appointed and design ongoing Design A71 River Irvine Bridge Refurbish – paint, replace expansion joints, waterproofing, drainage, surfacing - design. Construction in future year programme. £36,000 Consultant appointed and design ongoing Design B741/50 Nith Lodge Bridge Replacement. Appoint consultant for design and construction in future year £54,000 Consultant to be appointed for design via SXL Held pending possible WF proposals Programmed Annick Water, Stewarton Replacement of collapsing gabion training wall. Detailed design by consultant and construction £378,000 Site investigation completed. Report on SI and remedial options been received by ARA. Consultant appointed to undertake detailed design Design U/LOGA/10 Old Lugar Bridge Strengthening, masonry repairs and scour protection £300,000 Early stages of design Design C129/30 Chapeltoun Bridge Masonry repairs, Parapet heightening and scour protection 90% Complete. £120,000 Complete Complete
Page 37
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status C85/10 Fenwick Bridge Masonry refurbishment £24,000 Preliminary design Design B7036/10 Lugar Bridge, Ochiltree Major refurbishment – design in FY 2022/23, construction in future year £24,000 No progress U720/20 Lane Burn Bridge Masonry refurbishment 90% Complete. £70,000 Complete Complete U/KMCK/20 West Shaw Street Bridge Strengthen and Refurbishment No progress C135/20 Avon Bridge Masonry and scour repairs £36,000 No progress U736/10/C65 Sykeside Bridge Scour repair £24,000 No progress U729/00/C64 Hayhiolm Bridge Masonry and Scour repairs £36,000 No progress U729/00/C71 Barry Burn Culvert Masonry and Scour repairs £36,000 No progress U730/00/C37 Culvert Masonry and Scour repairs £36,000 No progress C36/10 Nith Bridge Masonry parapet rebuild and repairs to commence end of August 2022 £60,000 Consultant to be appointed for design via SXL Held pending possible WF proposals A70/100 Gatehouse Bridge Parapet heighten, scour repairs & masonry repairs £24,000 No progress A70/110/C46 Rose Burn Bridge Masonry and scour repairs £24,000 No progress Broomknowe Retaining Wall Design in 2022/23, construction in future years £24,000 No progress W/MUIR/20 Muirkirk Shops Retaining Wall Design in 2022/23, construction in future years £24,000 No progress
Page 38
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status Parapet Upgrades A70/70 Burnock Bridge, Ochiltree Parapet and other masonry repairs £216,000 Design ongoing Design A713/90 Dunaskin Bridge, Waterside Widening to create footway and replace both masonry parapets - design ongoing. £70,000 Tender delayed until Spring 2023 due to fish spawning issues with river working Tender ready A735/20 Victoria Bridge, Kilmarnock Site works ongoing re replacement of substandard vehicle parapets; deck expansion joints and paint superstructure, waterproofing and resurfacing.Works Substantially complete £570,000 Complete - snagging Complete B743/80 Cleuch Bridge, Sorn Upgrade of parapets and install footway £90,000 Design ongoing Programmed A713/70/C53 Drumgrange Bridge Upgrade of parapets, masonry repairs – works ongoing £6,000 Complete Complete C134/10 Ranoldcoup Bridge, Darvel Masonry repairs and heighten parapets £24,000 £240,000 No progress B769/40 Corsehill Mill Bridge Parapet replacement – design in FY 2021/22 £12,000 No progress B7082/10 Townhead Bridge Parapet replacement £150,000 No progress B743/135/C5 0 Beacon Hill Culvert Headwall Repairs No progress W/NCUMN/1 0 Burnside Retaining Wall Replacement £36,000 Preliminary Design Design
Page 39
Structure Reference Structure Name Proposed Works Revised Estimate of Projects C/F into 2022/23 Estimate of new projects for 2022/23 Comment Status U8/00/C8 Hendryton Burn Culvert Scour and masonry repairs works on site. £48,000 Works ongoing Site Rail Incursion C23/10 Rigg Road Rail Bridge, Cumnock Safety fencing - future year programme No progress Non ARA Council Footbridges Various sites Design, investigation £120,000 Minor repairs ongoing F/HURL/10 Portland Brae Footbridge Load Assessment, paint and replace concrete planks £230,000 Consultant completed structural assessment and preparing options for refurbishment Design F/CATR/20 Institute Ave Footbridge, Catrine Refurbishment £72,000 No progress Principal Inspections Various Principal Inspections of bridge stock by consultant and in-house staff £216,000 No progress TOTAL £3,037,000 £3,000,0 00 TOTAL (Estimated Carry Forward + new allocation) £6.037m
Page 40
APPENDIX 2: Traffic, Transportation and Road Safety Programmes 2022/23 (i) Road Safety Programme (ii) Safer Neighbourhoods Town Location Proposed Scheme Mauchline Cowgate Traffic management review Kilmarnock Prestwick Place, Fardalehill Traffic management Kilmarnock Sutherland Drive Traffic calming Galston Cessnock Road at Bowling Club Pedestrian build-out Mauchline Mansfield Road Traffic management review Town/Route Location Proposed Scheme Hurlford A71/B7073 roundabout AIP junction assessment Kilmarnock Hurlford Road 30mph speed limit extension Auchinleck Barony Road Speed Limit extension and gateway improvements Dalmellington High Main Street, Churchill, Knowehead Road safety improvements B742 Dalrymple B742 gateway entrance to Dalrymple Enhanced gateway features including vehicle activated sign B7034 Hollybush Hollybush 30mph speed limit A713 Waterside Waterside 50mph speed limit Auchinleck Various Waiting restriction amendments Lugton Dunlop Road Speed limit signing improvements Galston Brewland Street Extension of 30mph speed limit Kilmarnock A71 Campbell St off slip Signalisation assessment Kilmarnock A71 West of Bellfield I/C Road safety signing Stewarton Dunlop Road Pedestrian Refuge
Page 41
Stewarton Various roads 20mph speed limit orders amendments Kilmarnock Whatriggs Road 20mph speed limit amendments Cumnock Glaisnock Road Possible speed reduction measures Kilmarnock Foregate Square Permanent pedestrianisation scheme Various Various locations Vehicle activated signs upgrade (iii) Rural Route Action Plans Route Proposed Scheme B778 B778 Fenwick to Stewarton Route Study (iv) Cycling, Walking and Safer Routes (CWSR) Town Location Proposed Scheme Crosshouse/Kilmarnock B7038 Kilmarnock to Crosshouse Cycle route between Fardalehill and Crosshouse via hospital Crookedholm Grougar Road Grougar Rd localised road widening and pedestrian crossing facility Fenwick Kirkton Rd/Main St – Fenwick PS Pedestrian improvements/school street investigation Dunlop A735 Lugton Road Pedestrian crossing improvements Dalrymple B742 Barbieston Road Traffic calming and pedestrian crossing facilities Mauchline Loudoun Street Pedestrian crossing assessment Kilmaurs Main Street Improved pedestrian facilities Crosshouse Crosshouse-Dundonald Cycle route feasibility study Cumnock Netherthird School Streets Project Newmilns Loudoun Road Pedestrian Crossing Investigation Crosshouse B751 Gatehead Road Pedestrian Crossing Installation Kilmarnock Kilmaurs Rd at Hillhead PS Pedestrian Crossing Installation Darvel East Main St/Murdoch Road Junction sightline improvement Various Various locations Cycle and scooter parking at schools and other locations
Page 42
(v) Strathclyde Partnership for Transport (SPT) Location Project Kilmarnock Phase 3 refurbishment of Kilmarnock bus station to upgrade concourse and stance areas. Kilmarnock Glasgow Road bus park & ride Fenwick Footway improvements for access to X77 bus service (vi) SUSTRANS Location Project Hurlford Hurlford Street Design Project N/A East Ayrshire Active Travel Strategy Appendix 3 EV Chargers EAST AYRSHIRE PUBLIC CHARGERS CYC Ref Type Make Location Replacement Cost 51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £8,000 51210 22kw eVolt Foregate Car Park, James Shaw Crescent, Kilmarnock, KA1 1LU £9,000 50821 22kw eVolt Multi Storey Car Park, Kilmarnock, KA1 1LU £9,000 51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH £9,000 52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £9,000 52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000 52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000 52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000 52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000 52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB £30,000 52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000 52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
Page 43
52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000 51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £9,000 52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000 52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000 52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000 52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000 52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000 52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000 52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £30,000 50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW £9,000 51170 Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £30,000 50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP £9,000 50815 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR £30,000 52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU £30,000 52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE £30,000 52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG £30,000 52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS £9,000 52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB £30,000 52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000 52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000 52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000 51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £9,000 52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000 52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000 52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000 52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ £8,000 52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB £9,000 52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000 52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000 52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000 52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000 52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000 52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
Page 44
52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000 52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000 52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY £9,000 52962 Rapid eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £30,000 52963 22kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £9,000 53080 7kw eVolt Netherthird Community Centre, 65 Ryderston Drive, Cumnock, KA18 3AR £8,000 53778 Rapid eVolt Main Street Car Park, Muirkirk £30,000 53775 22kw eVolt Rose Reilly Sports Centre, Stewarton £9,000 53776 7kw eVolt Standalane Car Park, Stewarton £8,000 60786 7kW eVolt Academy Street, Hurlford £8,000 60732 22kW eVolt Drongan Centre car park, Mill of Shield Road £9,000 51210 22kW eVolt Carnshalloch Avenue car park, Patna £9,000 60250 22kW eVolt New Cumnock Outdoor Swimming Pool car park £9,000 60955 22kW eVolt Gatehead Road car park, Crosshouse £9,000 60924 7kW eVolt Queen Street car park, Kilmarnock £8,000 Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000 Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000 Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000 Awaiting programme of works 7kW eVolt Brown's Road car park, Newmilns £8,000 EAST AYRSHIRE FLEET CHARGERS CYC Ref Type Man. Location £9,000 52043 22kw eVolt Transport Depot, Crookedholm £8,000 52044 7kw eVolt Transport Depot, Crookedholm £8,000 52045 7kw eVolt Transport Depot, Crookedholm £8,000 52046 22kw eVolt Cleansing Depot, Western Road, Kilmarnock £9,000 52047 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000 52048 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000 51897 7kw eVolt Holmquarry House, Kilmarnock £8,000 51914 7kw eVolt Holmquarry House, Kilmarnock £8,000 51881 7kw eVolt Croft Street, Kilmarnock £8,000 51882 7kw eVolt Croft Street, Kilmarnock £8,000
Page 45
51883 7kw eVolt Croft Street, Kilmarnock £8,000 52964 Rapid eVolt Croft Street, Kilmarnock £30,000 52950 7kw eVolt Strand Street, Kilmarnock £8,000 52951 7kw eVolt Strand Street, Kilmarnock £8,000 52952 7kw eVolt Strand Street, Kilmarnock £8,000 60797 7kw eVolt Holmquarry House, Kilmarnock £8,000 60798 7kw eVolt Holmquarry House, Kilmarnock £8,000 60799 7kw eVolt Holmquarry House, Kilmarnock £8,000 7kw eVolt Ayr Road Council Depot, Cumnock £8,000 7kw eVolt Ayr Road Council Depot, Cumnock £8,000 7kw eVolt Ayr Road Council Depot, Cumnock £8,000 60083 22kW eVolt Croft Street, Kilmarnock £9,000 Awaiting programme of works 7kW eVolt New Cumnock Community Hospital car park £8,000 Awaiting programme of works 7kW eVolt New Cumnock Community Hospital car park £8,000 SOUTH AYRSHIRE CHARGERS CYC Ref Type Make Location 51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW £8,000 51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU £8,000 51535 Rapid eVolt Burns Statue Square, Ayr, KA7 UT £30,000 52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN £9,000 52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000 52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000 52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000 51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY £9,000 50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £9,000 50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ £9,000 50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF £9,000 52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG £9,000
Page 46
50816 Rapid eVolt Girvan Harbour, Girvan, KA26 9AG £30,000 52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR £9,000 52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH £30,000 52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU £30,000 52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE £8,000 52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE £30,000 52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000 52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000 52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000 53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £30,000 52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL £30,000 53774 Rapid eVolt Academy Street, Troon £30,000 53773 Rapid eVolt Lodge Road Car Park, Turnberry £30,000 53777 22kw eVolt Burnside Road, Monkton £9,000 60793 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly £9,000 60081 22kw eVolt Inches Close car park, Maybole £9,000 22kw eVolt Tarbolton Community Campus car park, Tarbolton £9,000 Awaiting commissioning 22kw eVolt Dundonald Primary School car park, Dundonald £9,000 60086 22kw eVolt Mossblown Activity Centre car park, Mossblown £9,000 60082 22kw eVolt Kirkoswald Main Street car park, Kirkoswald £9,000 Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000 Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000 Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000 Awaiting programme of works 22kW eVolt Barrhill Community car park, Main Street, Barrhill £9,000