AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
02 DECEMBER 2022 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: ROADWORKS PROGRAMME 2022/23
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this report is to advise the Joint Committee on the progress of
work through the roads improvement programmes within East Ayrshire and
South Ayrshire for financial year 2022-2023. 
RECOMMENDATIONS 
2. It is recommended that Joint Committee: 
(i) Notes the Ayrshire Roads Alliance works completed 2022/23,
(ii) Otherwise, notes the contents of this Report. 
BACKGROUND 
3. The budget allocation for East and South Ayrshire Councils Roads Investment
Programme for FY 2022/23 can be seen in tables 1 and 2 below respectively. 
Programme Area Budget (£m)
Carriageway Resurfacing 5.125
Footway Resurfacing 0.250
Street Lighting 0.230
Traffic & Road Safety 0.315
Structures (Bridges & Culverts) 3.000
Cycling, Walking & Safer Routes 0.778
Smarter Choices, Smarter Places 0.187
Sustrans 0.100
SPT  2.270
SFT 0.060
Car Parks 1.583
School Streets 0.100
EV Charging 0.100
Other Works 0.080
Total 14.178 
Table 1: East Ayrshire Council Roads Investment Programme 2022/23

Page 2

Programme Area Budget (£m)
Carriageway & Footway Resurfacing 3.500
Structures (Bridges & Culverts) 0.840
Street Lighting 0.205
20mph Rural Villages 0.023
Traffic Signals 0.390
LED Replacement 0.232
Girvan Harbour 0.318
Slope Stabilisation 0.190
EV charging  0.100
Cycling, Walking & Safer Routes 0.718
Smarter Choices, Smarter Places 0.173
Sustrans 0.335
SFT 0.060
SPT 0.500
Regional Active Travel Fund (NEW) 0.065
STTS 0.148
Total 7.797 
Table 2: South Ayrshire Council Roads Investment Programme 2022/23 
DETAIL 
4. The programmes for FY 22/23 are contained within Appendices One and Two. 
Resurfacing 
5. As reported at the last Shared Services Committee on 4 November 2022, East
Ayrshire Performs and South Ayrshire Members briefing all resurfacing
programmes in East and South Ayrshire Council has been suspended pending
further discussions with Finance colleagues in both authorities. 
6. The road and footway network in East and South Ayrshire are safe and continues
to be inspected by our Officers undertaking planned cyclic and reactive
inspections. Major defects discovered will trigger an immediate response by
Ayrshire Roads Alliance workforce to make good. 
7. Our roads maintenance teams continue to undertake routine maintenance
activities and are participating in winter treatment operations ensuring the
network in both East and South Ayrshire are passable and safe. 
Street Lighting 
8. Utilising our in-house electrical teams assisted by our appointed external
Contractor, the focus is now on the installation of festive lighting and attending
switch-on events in our communities ahead of Christmas period. 
9. LED replacement programme continues with progress as detailed in Appendix 1
and 2.

Page 3

Electric Vehicle Infrastructure 
10. The electric vehicle charging infrastructure programme has been included within
Appendix three for South and East Ayrshire respectively, with the number of
public chargers installed to date is included at Appendix 3. Work has been
ongoing with SFT and Transport Scotland to explore public/private partnerships
for public charging network. £120k has been awarded to ARA to develop a
private public strategy with a draft being discussed internally for submission to
SFT/TS upon on approval from both authorities. 
11. The faulty New Cumnock charger has been installed and is to be commissioned
within the coming weeks. 
Structures 
12. Many of the bridge projects that we undertake require works to be undertaken
within the watercourse and depending on what the works involve we often require
a licence to be obtained. SEPA has 4 months to determine a licence application
and they usually take this time. Other constraints, such as the fish spawning
season which typically runs from end October to end April can also restrict when
you can work in the watercourse. There are a number of projects ready for tender
but will require to be held back until early 2023 before issuing tenders for a start
in April/May 2023, outwith the fish spawning season. Where possible other
projects that do not require in-stream working will be brought forward. 
13. Land acquisition and/or access agreements are often required for bridge related
projects and can cause delay to the projects. A number of projects are currently
near tender ready but are being delayed due to land related issues. ARA are
actively working with the Council’s Estates and Legal teams in all of these
projects but land acquisition can be a very challenging and resource intense
activity for ARA, Estates and Legal sections. Again, where possible, projects that
do not require land acquisition or formal legal access agreements will be brought
forward. 
14. ARA representing South Ayrshire Council as a coastal authority participate as
one of four Local Authorities on the Coastal Adaptation Budget Group which has
representation from Scottish Government, Nature Scot, SEPA and Local
Authorities. Guidance for the allocation of the £550,000 General Capital Grant to
Local Authorities for 2023/24 has been developed and evaluation of the case
studies submitted by Local Authorities is ongoing. South Ayrshire Council
submitted a case study for Girvan Golf Course which utilises dredged material
from Girvan Harbour and a case study for Ballantrae to better understand the
coastal processes that are changing the beach and how to adapt for the future.
The South Ayrshire Council case studies were submitted by South Ayrshire
Council ‘Sustainability and Fleet’ supported by the Ayrshire Roads Alliance. 
15. The East Ayrshire Performs – Summary Report presented to Cabinet on 9
November 2022 advised that the New Cumnock Flood Protection Scheme which
is currently under construction had a projected shortfall in Council funding of

Page 4

£0.646m.  The scheme is being funded by both the Scottish Government and the
Council. Cabinet has approved the proposal that the shortfall be met from
reallocation of current budget allocations within the overall EAC Bridges Capital
programme. 
Traffic & Transportation 
16. Agreement has been reached where necessary to roll grant funding provision
into the new financial year to complete projects. The focus of these projects will
continue to be improvements to our roads and infrastructure to improve journeys
and increase safety measures where required. The Active Travel Strategy for
East Ayrshire is currently undergoing a final public consultation review – as
previously agreed at EAC Cabinet the final version of the Strategy can be signed
off by the Leader and Cabinet Member for Roads without the need to return to a
future Cabinet meeting. The Active Travel Strategy for South Ayrshire is finalised,
and only requires an update of the Leader foreword prior to formal publication. 
17. Road Safety Improvement Fund cross-boundary bid for £400,000 in total was
originally submitted to Transport Scotland, however due to unforeseen delays
the grant awards have not yet been issued. Transport Scotland have been back
in contact to ask bidders to reconsider what may now be realistically deliverable
between a grant award and 31st March 2023. We are currently in discussion with
Transport Scotland over an amended cross-boundary bid of £220,000 consisting
of proposals including the installation of pilot school gateway features at 2 x EAC
schools, an antiskid surfacing scheme on the A713 in EAC, a speed activated
signals trial in SAC, and a road safety enhancement scheme at a junction in SAC.
At present we await feedback from Transport Scotland on our revised proposals. 
APSE - Performance Network Awards 
18. The validation exercise has concluded and it has been indicated that both East
and South Ayrshire are finalists in the 2022 Roads Highways and Winter
Maintenance Category at the APSE Performance Network Awards Seminar to
be held on Thursday 1st and 2nd December 2022 with the winners announced. 
19. This prestigious performance networks awards is a high-profile occasion where
both the best performing authorities and the most improved are awarded for their
achievements. 
POLICY/COMMUNITY PLANNING ISSUES 
20. A well -maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire. 
21. The matters referred to in this report contribute to the South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome of ‘Work with partners to

Page 5

improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’ 
LEGAL IMPLICATIONS 
22. By virtue of the relevant statutory provisions, principally detailed within the Roads
(Scotland) Act 1984, the Council as local roads authority is required to manage
and maintain all publicly adopted roads within its area other than those which are
maintained and managed by the Scottish Ministers. 
HUMAN RESOURCES IMPLICATIONS 
23.  The work programmes have direct impact on human resources and the Alliance  
will ensure all works are suitably resourced to maintain satisfactory progress. 
EQUALITY IMPACT IMPLICATIONS 
24. An equality impact assessment is not needed because the proposal does not
have a differential impact on any of the protected characteristics. 
FINANCIAL IMPLICATIONS 
25. The Ayrshire Roads Alliance will deliver the strategic and local services as stated
in the Service Plan. The budget is provided by East Ayrshire Council, South
Ayrshire Council, and other external organisations. Appropriate scrutiny
arrangements are in place to manage these budgets. 
RISK IMPLICATIONS 
26.    The Ayrshire Roads Alliance Risk Register is reviewed and presented at every 
Joint Committee. 
27. The Works Programmes, Service Plan and the Risk Register do not expose
either Council to an increased risk as they have been developed from existing
budgets and existing service commitment. 
TRANSFORMATION STRATEGY 
28.   This Report aligns with the following design principle stated in the “Transformation 
Strategy 2017-2022”. 
Maximum value for our communities; by ensuring the road network is maintained. 
BACKGROUND PAPERS 
East Ayrshire Council Cabinet Report – 2022/23 Roads Asset Management Plan
– Investment and Programme - 16 March 2022 
South Ayrshire Council Leadership Report Road Improvement Plan 2022/23 - 08
March 2022

Page 6

LIST OF APPENDICES 
Appendix 1 - South Ayrshire Council Programme of Works 2022/23 
Appendix 2 - East Ayrshire Council Programme of Works 2022/23 
Appendix 3 – EV Infrastructure 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation Officer:Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org

Page 7

Appendix 1 - South Ayrshire Council- Ayrshire Roads Alliance
Carriageway Structural Maintenance Capital Programme over two years 2022/24 
Works Carried Over From 2021 
Route
No
Town Road Name Works
Description
Scheme
Score
Estimated
Cost
Comments Variance +/-
Uncl Ayr Sannox View Full Length N/A £76,230 Complete +£43,376.62 
Uncl Ayr Viewfield Road Full length N/A £58,905 Complete +£25,842.64 
Uncl Ayr Hunters Avenue T Lights to
Northfield
N/A £129,150 Complete  +£24,354.21 
Uncl Prestwick Kyle Street  Full length N/A £54,180 Complete +£7,829.69 
Uncl Ayr Dalmilling Drive   Full length N/A £71,904 Complete +£18,999.80 
Uncl Ayr Taylor Street Full Length N/A £109,141 Complete +£3,925.00 
Uncl Ayr Carrick Avenue Full Length N/A £100,947 Complete +£5,980.00 
Uncl Ayr St Phillans Avenue Full Length N/A £222,755 Complete +£88,534.12 
Uncl Ayr Southpark Road Full Length +
fway works?
N/A £125,364 Complete +£17,305.43 
A719 By Maybole Maidens Ayr North of
Humeston
N/A £98,572 Complete +£20,722.00 
B734 Old Dailly Barr Old Dailly Old Dailly to
Penkill +
N/A £108,000 On Hold

Page 8

drainage
improvements
B7035 By Girvan Glendoune Houdston
Road (Coalpots)
Braetoll South
+ S Power
shut down
N/A £100,500 On Hold 
Uncl Dailly Back Road Full Length N/A £107,646 Complete +£48,612.00
Uncl Girvan Carrick Street Full Length N/A £44,499 Complete +£20,501.00
Uncl Ayr Kersepark Footway Full length
one side
N/A £41,250 Complete -£7,738.00
Uncl Ayr Arthur Street Footway Full N/A £26,186 Complete -£5,428.00
B7023 Crosshill King Street
Footway
Shop side full
length
N/A £27,364 Complete -£7,414.00
C31 Crosshill Kirkmichael Road
Footway
By
Community
Centre
N/A £8,250 Complete +£14,064.62
Uncl Girvan Hawthorn Drive
Footway 
N/A £57,112 Complete +£2,292.92 
Surface Dressing Works –Proposed 2023/24 
U72 By
Dundonald
Crooks Full Length N/A  23/24 
U99 By
Symington
Dundonald Symington C32 to U98
Corraith
N/A  23/24 
C115 By Tarbolton Parkmill Road Parkmill to
C114
N/A  23/24 
C114 By Tarbolton Largie Road 2 sections N/A  23/24 
B744 By Tarbolton Tarbolton/Crosshands C114 to
Auchinweet
N/A  23/24 
C74 By Ayr Macnairston Road Macnairston
to Lochfergus
N/A  23/24 
C122 By Minishant School Road Full Length N/A  23/24

Page 9

C60 By Maybole Ladycross Full Length N/A  23/24 
C39 By Ayr Corton Road A77 to
Equestrian
Centre
N/A  23/24 
C29 By Maybole North Water of Girvan
- Maybole Road
30 mph
Maybole
south to U3
N/A   
U2 By Maybole Auchencross C29 to
Railway
Bridge
N/A  23/24 
U25 By Dailly Delamford B741 to
Hadyard Hill
N/A  23/24 
U56 Girvan Golf Course Road Newton
Kennedy Br.
to
Knockvalley
Cottages
N/A  23/24 
C102 By
Kirkoswald
Balvaird  Full Length N/A  23/24 
Carriageway Resurfacing Works 2022/24 
A719 By Tarbolton Failtoll Crossroads By Lilylaw
Farm
N/A £173,875 Complete +£47,888.92
A759 Dundonald Bypass Road,
Dundonald
Auchans to
Palmer Mount
61 £219,000 Complete +£35,384.70
B730 By
Symington
B730
Tarbolton/Dundonald
Dankeith to
B751
Junction
53 £158,763 Complete +£142,740.92
B730 By
Dundonald
B730 Bogend/A77(T)
- Tarbolton
Slough Bridge
to Tarbolton
53 £265,500 Complete Final
Measure

Page 10

Road/Dundonald,
Dundonald
Road
Dundonald
C92(C8) By Craigie Plewlands Road Full Length
incl part C8 to
A719
47 £139,040 Complete -£29,295.00
Uncl Troon Queens Drive Full Length 42 £35,640 Complete +£17,060.84
B744 By Tarbolton B744 Garden
Street/Tarbolton -
Council Boundary,
Tarbolton
From
Barrmuirhill
east to
Auchinweet
69 £159,000 Complete -£46,545.81
B743 By
Mossblown
Ayr / Mossblown? West from
Brocklehill
Farm
53 £271,250 On Hold 
C115 By Tarbolton C115 Montgomerie
Street/Tarbolton -
C114 Jcn Sw Of
Barhill, Mauchline
From Fail
Bridge
westwards
50 £123,200 Complete -£42,251.34
C37 Auchincruive Barrackhall Gibbsyard TBC 48 £134,400 On Hold 
Uncl Ayr Saltpans Road North from
Glebe Road
46 £48,750 On Hold 
Uncl Tarbolton Springfield Road Garden Street
to No 50
46 £35,200 On Hold 
Uncl Prestwick Morris Road Full Road 43 £34,320 On Hold 
Uncl Ayr Green Street Waggon
Road to
Crown Street
42 £67,760 On Hold 
Uncl Prestwick Craigie Street Full length 39 £11,638 On Hold 
C74 By Ayr Macnairston Road C105 to B742
Junction
52 £92,960 On Hold 
B744 By Annbank B744 Jcn At B742 N
Of Annbank - B743,
Annbank
from B743
junction
63 £120,000 Complete -£48,811.86

Page 11

south-
westwards
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
By Holebogs,
S bend
59 £45,000 On Hold 
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
From A70 at
Hillhead
south to C21
Craigs Road
junction
56 £57,000 On Hold 
B744 Annbank Weston Avenue Craighall Way
to 101
Weston
Avenue
56 £70,875 On Hold 
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
From
Meadowhead
Depot
entrance
south-wards
55 £97,500 On Hold 
B744 Annbank Weston Brae Full Length 53 £58,125 On Hold 
B744 Annbank Browns Crescent Full Length 53 £28,125 On Hold  
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
Bridge of
Coyle to C2
52 £190,500 On Hold 
B744 By Annbank B744 Belston/A70 -
Weston
Avenue/Annbank, Ayr
Auchincruive
Junction to
Glenview
52 £91,250 On Hold 
U77 By Coylton Hole Road Full Length 46 £43,360 On Hold 
Uncl Ayr Ellisland Square Full Length 42 £58,806 On Hold 
Uncl Ayr Chapel Park Road Full Length 40 £53,319 On Hold

Page 12

B742 By Maybole B742 Jcn Of A77(T)
Ne Of Maybole -
Council Boundary S
Of Dalrymple,
Maybole
From B7045
junction
westwards
N/A £66,845 On Hold 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
By Humeston,
Castlehill
woods to
Pennyglen
70 £93,800 On Hold 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
Cemetery to
Drumshang
67 £182,000 On Hold 
A719 By Maidens A719
Pennyglen/B7023 -
Kirkoswald
Road/Maidens,
Maidens
Morriston
Farm to Jct
Blawearie
56 £186,000 On Hold 
A719 By Maidens A719 Turnberry
Road/Maidens -
Maidens
Road/Maidens,
Turnberry
Maidens to
Turnberry
56 £232,500 On Hold 
A719 By Maidens Maidens, Ayr North of
Humeston
Turnberry 
£140,000 Complete +£20,722.00
B7023 Maybole Crosshill Road Full Length 56 £56,250 On Hold 
B7023 Maybole St Cuthbert's Road Full Length 53 £28,125 On Hold 
B7024 Maybole Alloway Road Redbrae to
Bypass
51 £71,250 On Hold 
C122 By Maybole C122 Gardenrose
Path/Maybole -
School
School to new
Bypass
50 £18,150 On Hold

Page 13

Road/Minishant,
Maybole
C122 By Maybole C122 Gardenrose
Path/Maybole -
School
Road/Minishant,
Maybole
Ladycross to
new Bypass
50 £24,192 On Hold 
B7023 Maybole Crosshill Road Full Length 56 £56,250 On Hold 
B7023 Maybole Maybole Crosshill 30mph
Maybole to
jcn C58
72 £323,840 On Hold 
A714
(STTS)
Barrhill Main Street  Full Length 61 £148,800 On Hold 
B7027 Barrhill Knowe road Jcn A714 to
Dusk mill
area.
58 £53,808 Complete +£27,277.00
B741 Dailly Girvan/Dailly Bargany  55 £105,840 Complete +£80,649.84
C29 Maybole North Water of
Girvan/Maybole Road
Wallacetown
to Ruglen
various
locations
55 £136,125 Complete -£1,222.12
U52 Pinwherry Muck road Various TBC 52 £76,800 On Hold 
C45 Ballantrae Heronsford Road A77- Laggan 48 £56,840 On Hold 
U6 By
Ballantrae
Balkissock Full length 44 £101,482 Complete +£3,113.35 
Footway Resurfacing Works 2022/24 
Uncl Troon Fullarton Drive  No 19 to No
37
30 £16,500 On Hold

Page 14

B730 Dundonald Drybridge Road Bowling
Green to
Kilnford Dr
28 £14,500 On Hold 
B730 Dundonald Drybridge Road Kilnford Drive
to A759
28 £33,600 On Hold 
C492 Troon Bentinck Drive No 97 to No
121
28 £20,000 On Hold 
Uncl Prestwick Outdale Avenue F/path
Sherwood
Road side ,
both sides
30 £38,300 On Hold 
C17 Tarbolton Westport Footway
North side
28 £17,370 On Hold 
B743 Mossblown Mauchline Road Fourways to
Railway
Bridge North
side
28 £15,300 On Hold 
Uncl Ayr Content Avenue South Side
full length
(College
Side)
28 £8,400 On Hold 
Uncl Mossblown Martin Avenue  28 £15,300 On Hold 
Uncl Prestwick Hunters Avenue South from
Heathfield
Road, west
side
23 £7,500 On Hold 
Uncl Ayr Bellevue Crescent  34 £37,800 On Hold 
Uncl Ayr Hawthorn Drive  30 £62,000 On Hold 
B742 Annbank Weston Brae  28 £10,700 On Hold 
Uncl Maidens Ardlochan Road  30 £20,000 On Hold 
Uncl Maybole Hicks Avenue No 2 to No 94 30 £28,980 On Hold

Page 15

Uncl Maybole Queens Terrace No 17 to No
39 + cway
see separate
entry
28 £18,000 On Hold 
Uncl Maybole Kingcraig Avenue No 2 to No 32
+ cway see
separate
entry
28 £22,800 On Hold 
Uncl Ayr Lochpark slab
replacement
23 £20,425 On Hold 
C151 Dailly Woodside Both sides
from Back St
and Hadyard
Terr
30 £20,400 On Hold 
Uncl Dailly Church Crescent Odd number
side full
length
30 £16,000 On Hold 
Uncl Crosshill Newton Street Church Side
of road
30 £15,795 On Hold 
Uncl Dailly Hadyard Terrace Inside
footway +
part outer
section
28 £54,400 On Hold 
TOTAL  £6,928,827

Page 16

South Ayrshire Council- Ayrshire Roads Alliance
Lighting Programme 2022/23 
Town Location Work Type No of
columns
Estimated
Programme
Cost
Comments Variance +/-
Ayr James Street and Area Carry forward from
2021/22 30 £62k On Site 
Ayr
Auchendoon Crescent
and various Service
Roads
No existing lighting 7 £17k
On Site 
Ayr Dalmilling Road (Phase
2) 5th Core supplies 9 £15k programmed 
Ayr Sannox Road & Place
(Phase 2) 5th Core supplies 8 £20k programmed 
Maybole Greenside (Phase 2) Concrete columns 9 £20k Complete Final Measure
Prestwick Mossbank
Old steel columns and
5th Core supplies
(ongoing section
faults)
24 £50k
Complete Final Measure
Troon
Barassiebank Lane
(part), 
Muir Dr and Wallace Dr
Concrete columns 14 £30k
Complete  Final Measure    
£214k   
South Ayrshire Council- Ayrshire Roads Alliance
LED Lighting Programme 2022/23 
Town Description Remaining
Ayr, Dundonald and
Prestwick - 28

Page 17

South Ayrshire Council- Ayrshire Roads Alliance
Traffic and Transportation Programme 2022/23 
Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/- 
SPT £39,000 Match £500,000 Access for All
Review Coylton  
£400,000 Match Alloway to Burton
Construction
Contractor
appointed 
£11,000
Match Dundonald to
Barassie Link Ph1
Construction
Design 
£50,000 No
Match
SQP Various
Projects
Design 
Sustrans –
Places for
Everyone 
£114,926 Match £335,197  Access for All
Review Coylton
Awaiting
confirmation of
land acquisition 
£111,271 Match Alloway to Burton
Construction
Contractor
appointed 
£109,000 Match Dundonald to
Barassie Link Ph1
Construction
Awaiting
confirmation of
land acquisition 
£0 No
Match
Loans to Troon
Railway Station
(Phase 3)
Awaiting
confirmation on
£56k bid 
Regional
Active
Travel Fund
(NEW)
£65,000 Match £65,000 Alloway to Burton
Construction
Contractor
appointed

Page 18

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
Sustrans –
Cycle
Shelter
Fund
£0 Direct
Match
£0 School Cycle
Shelters
Schools now
require to bid to
fund directly 
SCSP £173,150 Hub
Match 
£173,150 Active Travel Hub
Ayr
Ongoing Project
delivery 
SAC in Kind £0.00 - Active Travel Hub
Ayr  
CWSR  £100,000 Match 
£718,057 
Access for All
Review Coylton  
£423,729 Match Alloway to Burton
Construction
Contractor
appointed 
£40,000 Match Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
Works
Complete
Final Measure
£44,328 Match Dundonald to
Barassie Link Ph1
Construction
Scheme Design 
£45,000 Hub
Match
New crossing
feature –
Dalmilling Drive,
Ayr  
£30,000 Hub
Match
New speed
reduction
schemes on key
walking routes,
Ayr

Page 19

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
£30,000 Hub
Match
New cycle
parking facilities –
various locations  
£5,000 Hub
Match
New bike repair
stations –
locations TBC  
Developer
Contribution £100,000 Match  £100,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
Works
Complete
Final Measure  
Total £1,891,404   
ARA New
Signals £160,000 Match  £160,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
Works
Complete
Final Measure  
Total £2,051,404

Page 20

South Ayrshire Council-Ayrshire Roads Alliance 
Traffic and Transportation Signal Replacement 2022/23 
Signal
No Town  Description  Work
Type
Estimated Programmed
Cost 
Comments Variance
+/-
SAS 15 Ayr
Castlehill
Rd/Chalmers
Rd
Junction
Replacement £40,000
Design
complete to be
programmed 
SA59 Ayr
Whitletts
Road/Craigie
Rd
Junction
Replacement £50,000
Design
complete to be
programmed 
SA17 Ayr
Whitletts
Rd/Mainholm
Rd
Junction
Replacement £45,000
Design
complete to be
programmed 
SAP1 Ayr Holmston Rd
Pedestrian
Crossing
Replacement
£0
Works carried
forward to
2023/24 
Total    £190,000   
South Ayrshire Council - Ayrshire Roads Alliance
Structures Capital Programme 2022/23 
Description   Work Type Estimated
Programme Cost 
Comments Variance
+/-
A79-30 Victoria Bridge Joint Replacement and
waterproofing
£300,000 On Site 
A79-30 Victoria Bridge Concrete Repairs and Painting £490,571 On site 
£790,571

Page 21

Appendix 2 East Ayrshire Carriageway Structural Maintenance Programme 2022/23 
ROAD LOCATION Estimated Cost Cost to Date variance +/- Comment 
South of Hollybush and    
A713 Polnessan to Patna £318,750.00 £266,500.00 -£52,250.00 Complete
A71 Main Street Darvel £121,875.00   On Hold
A70 Lugar Water Bridge to East Gateway and Carbello £234,375.00 £254,375.00 +£20,000.00 Complete       
A719 Moscow and Rural Sections £262,500.00 £381,000.00 +£118,500.00 Complete      
A735 U26 to past C7 Junction £159,375.00   On Hold
B743 Strathaven
Road Muirkirk 950m to South Lanarkshire Boundary £98,800.00   On Hold
B7036 Barony Road Near Egger factory Entrance £93,750.00   Cancelled
C134 Rural Sections £51,200.00   On Hold
C50 Ochiltree Various sections £89,600.00   Complete
C6 Stewarton Various sections £89,600.00 £50,000.00 -£39,600.00 Complete
C22 Coal Road, From U730 to A70 £592,000.00 £380,476.00 -£211,524.00 Complete
C23 Rigg Road and from U730 to Railway Bridge    
U730 Glenshamrock
Road from B705 to C23    
U1 GalstonMoor
Road U56 to A71 £160,000.00 £50,000.00 -£110,000.00  Complete
U760 Dalcairnie Full Length £116,480.00   On Hold
U26 Dunlop Full Length £48,000.00   On Hold
U729 Glenmuir
Road Logan Avenue to Loganhill Road £20,000.00 £55,701.00 +£35,701.00 Complete
Ellis Street
Kilmarnock Full Length £16,800.00   On Hold
Howard Street
Kilmarnock Full Length £71,400.00   On Hold
Seaford Street
Kilmarnock Full Length £112,200.00   On Hold
Dundonald Road
Kilmarnock Smillie Place to Seaford Street £123,200.00   On Hold

Page 22

Witchknowe Road
Kilmarnock New Street to Witchknowe Avenue £9,350.00  
Completed
last financial
year
Meiklewood Road
Kilmarnock No1 to No 31 £28,050.00   On Hold
Shortlees Crescent
Kilmarnock Rathlin Avenue to Shortlees Road £37,400.00   On Hold
Old Street
Kilmarnock Academy Street to Campbell St £32,130.00   On Hold
Kinlock Road
Kilmarnock Full Length £36,371.50   On Hold
Stoneyhill Avenue
Kilmarnock Full Length £18,700.00   On Hold
Turner Place
Kilmarnock Full Length £27,200.00   On Hold
Craufurdland Road
Kilmarnock No87 to No145 £20,400.00   On Hold
Old Mill Road
kilmarnock Lawson Street to Saturrock Street £52,800.00   On Hold
Grassyards Road
Kilmarnock Kennedy Drive to C10 £52,800.00   On Hold
Mansfield Road New
Cumnock A76 to Top Corner/ Junction £255,200.00   On Hold
Loch View New
Cumnock Full Length £32,725.00 £42,000.00 +£9,275.00 Complete
Mill of Shield
Drongan B730 to Drumwhill Road and £93,500.00 £209,130.00 +£115,630.00 Complete
Glencraig Street
Drongan Lane Crescent to Hannaston Avenue    
Blaney Avenue
Patna Full Length £28,050.00   On Hold
Wallace Street
Galston B7037 to Cross    
Titchfield Street
Galston Standalane to Orchard Street £74,460.00 £142,468.00 +£68,008.00 Complete
Henrieta St Galston Various Sections    
Cessnock Road
Hurlford,     
Craigie Road
Hurlford and Full Lengths £172,975.00 £319,388.00 +£146,413.00 Complete

Page 23

Blair Avenue
Hurlford     
Crougar Road
Crookedholm Full Length £58,905.00   On Hold
Meadowside
Crookedholm Full Length £6,375.00   On Hold
High Street
Newmilns Full Length £38,250.00   On Hold
East Donnington
Street Darvel Full Length £30,600.00   On Hold
Burn Road Darvel Various Sections £74,800.00   On Hold
Campbell Street
Darvel Full Length £28,050.00   On Hold
Patterson Terrace
Darvel Full Length £21,505.00   On Hold
Fleming Drive
Stewarton Full Length £11,874.50   On Hold
Lothian Road
Stewarton Full Length £46,750.00   On Hold
Victoria Way
Stewarton Full Length £13,090.00   On Hold
Cutsburn Road
Stewarton Full Length £74,800.00   On Hold
Irvine Road
Kilmaurs Full Length £21,505.00   On Hold
Newmill Road
Dunlop Full Length £76,500.00   On Hold
Middlefield Drive
Muirkirk Full Length £14,450.00   On Hold
Poole Avenue
Ochiltree Full Length    
Broom Cresent
Ochiltree Remaining Length £31,450.00 £65,000.00 +£33,550.00 Complete
Douglas Brown
Avenue Ochiltree Full Length    
Dalgleish Avenue
Cumnock Full Length £26,350.00  Final
Measure
Complete
McLymont Court
Cumnock Full Length £24,480.00  Final
Measure
Complete

Page 24

Holland Crescent
Cumnock Full Length £47,600.00  Final
Measure
Complete
Tanyard Car Park
Cumnock Full Car Park £70,400.00  Final
Measure
Complete
Ayr Road Car Park
Cumnock Full Car Park £79,200.00   To be
Programmed
Elizabeth Crescent
Cumnock Full Lengths £61,200.00 £80,379.00 +£19,179.00 Complete
Gemmel Avenue
Cumnock     
C3 Barsminning
Road Mauchline From Rail Bridge to U742 Mosshead Road £17,820.00 £59554.00 +£41,734.00 Complete
Hughfield Road
Mauchline Full Length £55,500.00   On Hold
Carrick View
Mauchline Full Length £41,250.00   On Hold
Beechwood Road
Mauchline Full Length £69,500.00   On Hold
Jean Armour Drive
Mauchline Full Length £112,500.00   On Hold
Cairn Road
Cumnock Various Sections £103,950.00 £140,138.66 +£36,188.66 Complete
Park Crescent
Dalmellington Full Length £62,370.00   Complete
Main Street
Dalmellington Full Length £40,040.00   Ongoing

Page 25

Appendix 2  East Ayrshire Footway Structural Maintenance Programme 2022/23 
Section Street Name Location Environment Footway
Material Length Average
Width Treatment Area Cost
New
Cumnock Loch View Full Length
Both Sides Residential Bituminous 300 2
New PCC
Kerbs,
reconstruct,
HRA
600 £22,800
Patna Blaney
Avenue
No12 to
Main Street Residential Bituminous 144 3.25
New PCC
Kerbs,
reconstruct,
HRA
468 £14,976
Dalmellington Broomknowe
No 33 to
Gateside
Road
Residential Bituminous 106 1.8
New PCC
Kerbs,
reconstruct,
HRA
191 £6,106
Ochiltree Broom
Crescent
No1 to
Gallowlee
Avenue
Residential Bituminous 215 1.8
New PCC
Kerbs,
reconstruct,
HRA
387 £12,384
Ochiltree Mill Street Coachhouse
to A70
Residential Bituminous 200 2 New PCC
Kerbs,
reconstruct,
HRA
400 £12,800
Kilmarnock  Riverbank
Place
No3 to No
19
Residential Bituminous 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Kilmarnock  Western
Road
Various
Sections
Residential PCC Slabs 970 2 New PCC
Kerbs,
reconstruct,
HRA
1940 £62,080
Kilmarnock  Sannox
Road 
No1 to No31  Residential Granolithic 140 2 New PCC
Kerbs,
280 £8,960

Page 26

reconstruct,
HRA
Darvel Burn Road A71 to West
Donington
Street
Residential Granolithic 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Darvel Ranolcoup
Road
A71 to
Mair's Road
Residential Granolithic 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Cumnock Hearth
Road/Hearth
Road
Car Rd to
Emry's
Avenue
Residential Bituminous 420 1.8 New PCC
Kerbs,
reconstruct,
HRA
756 £24,192
Auchinleck Barbieston
Road
Talbot Drive
to Church
Street
Residential Bituminous 320 1.8 New PCC
Kerbs,
reconstruct,
HRA
576 £18,432
Kilmaurs Sunnyside B751 to
Yardside
Residential Bituminous 175 2 New PCC
Kerbs,
reconstruct,
HRA
350 £11,200
Stewarton Merrygreen
Place
Full Length
One Side
Residential Bituminous 450 1.8 New PCC
Kerbs,
reconstruct,
HRA
810 £25,920
Stewarton Holm Street One Section Residential Bituminous 40 2 New PCC
Kerbs,
reconstruct,
HRA
80 £2,560
Drongan Watson
Terrace
From Cul-
De- Sac to
Taiglum
Place
Residential Bituminous 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Drongan Taiglum
Place
Watson
Terrace to
lane
Residential Bituminous 75 1.8 New PCC
Kerbs,
reconstruct,
135 £4,320

Page 27

Crescent HRA
Crosshouse Kilmarnock
Road
Playingfield
Road to
Gatehead
Road
Residential Bituminous 140 1.2 New PCC
Kerbs,
reconstruct,
HRA
168 £5,376                  
£245,930

Page 28

APPENDIX 2: Environmental Improvement Programme 
Year Project Description of Works Benefit Estimated
Cost 
2020/21 Hayhill, by Drongan, Environmental
Improvement
Kerb, upgrade verge
and form parking bay
Improve environment in village
and road safety by formalising
parking area.  £15,000 
2021/22  Craigie Avenue, Kilmarnock Form Lay-by - street
parking bays
Improve environment and road
safety by reducing on street
parking problems.  £15,000 
Future Years Wellpark Crescent Kilmarnock, widen
road.
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000 
Future Years  Kilmarnock Rd Service Rd Crosshouse,
widen road. 
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years Hillcrest, Bellsbank, Dalmellington
Parking Bays
Form 6 No Off-Street
parking bays
Improve environment and safety by
reducing on street parking
problems.  £15,000 
Future Years  North Hamilton Place Kilmarnock, parking
bays.  Additional Parking Area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years  Gateside Road, Galston, widen road. Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000

Page 29

Appendix 2 Street Lighting Works Programme 2022/23 
East Ayrshire Lighting Capital Programme 2022/23 
Town Location Work Type Estimated C/F Cost Comments Variance +/-
Dalrymple Church Street Area Carry forward from 2021/22  £45k Complete Final Measure
Kilmarnock  Lomond Road Area Carry forward from 2021/22 £15k Complete Final Measure
Darvel Glen Cres and Hutchison Dr Carry forward from 2021/22 £45k Not issued 
£105k        
Town Location Work Type Estimated
Programme Cost
Comments Variance +/-
Hurlford
Sherwood Road, Liffnock
Avenue, Cessnock Ave,
Cessnock Drive, Cessnock Rd
5th Core supplies and concrete
columns £90k 95% Complete 
Kilmarnock Ayr Road, Service Road 5th Core supplies and concrete
columns £30k 90% Complete 
Muirkirk
Pagan Walk, Stoneyhill Avenue,
Wardlaw Ave and Hawkshaw
Terrace
5th Core supplies and concrete
columns £70k Complete
Final Measure
Dalrymple Barbieston Rd and Cedar
Terrace                                                    
5th Core supplies and concrete
columns £40k 80% Complete 
£214k

Page 30

East Ayrshire LED Lighting Programme Update 2022/23 
Town Lantern
Amount Status Lantern
Tender
Delivery /
start
install
Install
complete
by
New Cumnock & Dalmellington 766 Complete   
Patna & Dalrymple 563 Complete   
Mauchline,Sorn & Catrine 957 Complete   
Ochiltree & Drongan 562 Complete   
Auchinleck & Cumnock 1535 Complete   
Irvine Valley (including Hurlford & Crookedholm) 1860 Complete   
Kilmarnock South (including Crosshouse,
Gatehead 
& Knockentiber)
2300 Complete   
Kilmarnock - North East 1135 Lightways Contractor – started Feb
2022
July-Aug
21 Dec-21 95%
Complete
Kilmarnock - North West 1850 Complete   
Kilmarnock - Central 1400 On site   Mar-23
East Ayrshire - Decorative 350 75% complete 
tender to be issued for next stage   Dec-22
Logan, Lugar, Cronberry & Muirkirk 390 20% Complete
Lightways Contractors started  Oct-22 Feb-23
Stewarton, Kilmaurs, Fenwick, Dunlop & Lugton 1420 20% Complete
Lightways Contractors started  Oct-22 Feb-23 
Current Status 
Programme completed conversions
to date
12,096 Replacement programme 80.2% complete
Overall LED units completed 17,680 LEDs now 85.5% of total EAC inventory

Page 31

East Ayrshire LED Programme Funded Replacement Works 
During our design works for our LED conversions, we have identified a number of older installations in East Ayrshire where it is not practicable to simply
replace the existing discharge lighting with LED lanterns. Consequently, the following full lighting replacement projects have been programmed and will be
funded from the LED replacement budget.
Town Location Estimated
Cost Scheduled Comments
Fenwick Glebe Terrace, Fenwick £20k Nov-22 Awarded 
Galston Orchard Street, Galston £35k Nov-22 Awarded
Kilmarnock Ellisland Drive Area, Kilmarnock £45k Nov-22 Awarded
Hurlford Riccarton Road Service Road, Hurlford £25k Dec-22 At design stage
Kilmarnock Samson Ave, Linfern Ave Areas, Kilmarnock £95k Jan-23 At design stage
Stewarton Clerkland Road Area, Stewarton £70k Jan-23 At design stage
Kilmarnock Glasgow Road B7038, Kilmarnock £70k Feb-23 At design stage
Kilmarnock Forest Grove and Woodlands Grove, Kilmarnock £85k Feb-23 At design stage
Kilmarnock Gibson St and Carmel Ave Areas, Kilmarnock £110k Mar-23 
Kilmarnock Wilson Ave, Greenan Rd, Dunure Rd Area, Kilmarnock £120k Mar-23 
2022/23 Total £675k   
Town Location Estimated
Cost Scheduled Comments
Kilmarnock Woodstock Street Area, Kilmarnock £50k Apr-23  
Stewarton Annick Crescent Area, Stewarton £75k Apr-23  
Fenwick Maunsheugh Road, Fenwick £50k May-23  
Fenwick Skernieland Road, Fenwick £30k May-23  
2023/24 Total £205k

Page 32

APPENDIX 2: Bridge and Culvert Strengthening Programme 
Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Comment  Status 
Bridge Strengthening and Replacement     
U22/10  Burnfoot Bridge, near
Darvel
Replacement – Near tender ready. Land
acquisition outstanding   £444,000
Ground
Investigation
completed. Land
acquisition reqd.
SEPA CAR
Licence received
Design & tender
docs 
C127/10  Low Ashyard Bridge
Infilling of bridge by Historical Railways
Estate. EAC part contribution  £5,000 
HRE has funded
the installation of
temporary
supports and
working up design
to sleeve the
structure
Programmed 
Funding
discussions
ongoing with
HRE 
U26/10
West Clerkland Bridge,
near Stewarton
Replacement – currently closed to traffic;
near tender ready.  CPO required to obtain
land acquisition. Construction likely to be
in future year programme 
£12,000 
Land acquisition
stalled due to
landowner. CPO
reqd.
Bridge completely
closed to veh &
peds. With Legal
to undertake CPO. 
Tender ready 
B730/10
Littlemill Bridge,
near Rankinston
Replacement - near tender ready; land
acquisition to be concluded; construction
likely to be in future year programme   £6,000
Land acquisition
near complete.
Advance electricity
diversion
complete. 
Near Tender
ready. Works in
2023/24 
A71/280/C8
0
Mathews Burn Culvert,
West Donnington St,
Darvel
Replace section of culvert below West
Donnington Street; design  on going and
near tender ready, land acquisition to be
concluded.
£5,000  £144,000
SEPA Licence
obtained.  Land
acquisition near
complete 
Design/Tender

Page 33

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Comment  Status 
B713  B713 Road Slip south of
Sorn 
Detailed design and construct sheet piled
wall   £312,000
Consultant
working up
detailed design &
tender
documents 
Design/tender 
B705  B705 Road Slip centre of
Catrine  Detailed design   £18,000  No progress 
B705  B705 Road Slip north of
Catrine  Detailed design   £18,000  No progress 
Various  Investigative works  Topographical surveys, paint surveys, etc   £6,000  Package of
topos awarded 
C108/00/C4
4 Gateside Farm Culvert
Replacement with box culvert units
– contract awarded – start March
2022 Completion end of May   £102,000  Complete  Complete 
A735/130/C
58  Gills Burn Culvert, Dunlop
Part deck replacement and Retaining
Wall Repairs - design in  2022/23 and
construction in future year programme  £10,000   
On hold (as
part of F&PM
wider ECC
build)
U45/10 Kirkland Bridge, Springside
Replacement of boundary bridge - North
Ayrshire Council is lead authority. East
Ayrshire Council funding 50% in 2022/23
£54,000  Complete  Complete
U751/10 Crossflats Bridge Replacement – design by consultant  £60,000  No progress
Consultant
to be
appointed
for design
via SXL
U760/00/C93 Glenhead Culvert Replacement  £42,000 No progress

Page 34

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects C/F into
2022/23
Estimate
of new
projects
for
2022/23
Comment  Status
U740/10 Barbieston Bridge Boundary Bridge Replacement – design by
consultant  £24,000 No progress 
Cessnock Ave, Hurlford Retaining Wall replacement works on site.  £36,000 98% Complete 98% Complete
U44/10 Bruntland Bridge Strengthen and refurbish  £24,000 No progress 
Upgrade Works identified from inspections    
B705/10/C
91
Cowan Place Culvert,
Catrine Masonry repairs/scour repairs  £24,000 
Site visit
undertaken and
preliminary design
Preliminary design 
B705/20  Shellies Bridge, Catrine
Scour repairs; masonry training wall repairs
and culvert extension – Consultant
appointed to undertake design & works
ongoing; land acquisition  required.
Construction in future year programme 
£6,000 
Consultant design
ongoing. Land
acquisition to be
determined 
Design 
A71/300  Priestland Bridge
Retaining Wall strengthening – finalise
design, conclude land
acquisition/servitude and
construct.Tender evaluation. 
£120,000 
Works ongoing  Site
U764/10 Glenmuir Bridge Scour repairs £42,000  No progress 
A70/130/W
31 Thornwood Wall, Lugar
Replacement - Consultant appointed to
undertake design which is ongoing; land 
acquisition required. Construction in future
year programme
£6,000 
Consultant design
ongoing and site
investigation
complete. Sheet
pile option
developed but
conflict with O/H
power cables
being investigated
Design 
Queens Crescent,
Newmilns 
Replace riverbank retaining wall.tender
being evaluated. 
£325,000 
Tender delayed
until Spring 2023
due to fish
spawning issues
with river working
Tender ready

Page 35

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects C/F into
2022/23
Estimate
of new
projects
for
2022/23
Comment  Status 
Galston to Newmilns
Cyclepath 
River realignment works – additional rock
armour works.Works Complete
£72,000  Complete  Complete 
B741 Coal Glen
Embankment Slip, near
Dalmellington
Ground investigation complete. Consultant
finalizing design & tender package. Land
acquisition required. Construction
potentially in 2022/23.
£24,000  £360,000
Near tender ready  Design
A713/60/C
61 Polnessan Upper Bridge
Extension of culvert. Design and land
acquisition in 2022/23. Construction in
future year programme.
£24,000  No progress 
C90/35/CG
02 Cattle Grid
Replacement of cattle grid and bypass
improvement.. Tender ready. Est £30,000
Funded by WF developer  
Tender issue
imminent
Tender ready
A736/60/C
84 Lochridge Culvert  Masonry and drainage repairs £60,000 
Near ready for
tender issue
Design 
F/LUGA/10
Logan to Park Terrace
Footbridge, Lugar
Replacement of footbridge deck.on
refurbished abutments. Consultant design
ongoing  £150,000
Deck replacement
and scour
protection ongoing
Design
B705/20/C
68
Smithy’s Culvert, near
Catrine
Replace with box units - future year
programme   No progress 
B741/40/C
79
Polmathburn Bridge, near
Dalmellington
Replace damaged deck slabs - future year
programme   No progress 
A71  Dundonald Rd Bridge
Refurbish –  replace expansion joints,
waterproofing, drainage, surfacing – design.
Construction in future year programme.  £36,000
Consultant
appointed and
design
ongoing
Design

Page 36

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Comment  Status 
A71  Riccarton Viaduct
Refurbish – paint, replace expansion
joints, waterproofing, drainage, surfacing –
design. Construction in future year
programme. 
£36,000
Consultant
appointed and
design ongoing
Design 
A71  River Irvine Bridge
Refurbish – paint, replace expansion
joints, waterproofing, drainage, surfacing -
design. Construction in future year
programme. 
£36,000
Consultant
appointed and
design ongoing
Design 
B741/50 Nith Lodge Bridge
Replacement. Appoint consultant
for design and construction in
future year  £54,000 
Consultant to be
appointed for
design via SXL Held
pending possible
WF proposals
Programmed 
Annick Water, Stewarton
Replacement of collapsing gabion
training wall. Detailed design by
consultant and construction   £378,000
Site
investigation
completed.
Report on SI
and remedial
options been
received by
ARA.
Consultant
appointed to
undertake
detailed design 
Design
U/LOGA/10 Old Lugar Bridge
Strengthening, masonry repairs
and scour protection £300,000  Early stages of design Design 
C129/30 Chapeltoun Bridge
Masonry repairs, Parapet
heightening and scour protection
90% Complete.
£120,000  Complete  Complete

Page 37

Structure
Reference
Structure Name Proposed Works Revised
Estimate
of Projects C/F
into 2022/23
Estimate
of new
projects
for
2022/23
Comment  Status
C85/10 Fenwick Bridge Masonry refurbishment £24,000  Preliminary
design 
Design
B7036/10 Lugar Bridge, Ochiltree Major refurbishment – design in FY
2022/23, construction in future
year 
£24,000 No progress 
U720/20 Lane Burn Bridge Masonry refurbishment 90%
Complete. £70,000  Complete Complete
U/KMCK/20 West Shaw Street Bridge Strengthen and Refurbishment   No progress 
C135/20 Avon Bridge Masonry and scour repairs  £36,000 No progress 
U736/10/C65 Sykeside Bridge Scour repair  £24,000 No progress 
U729/00/C64 Hayhiolm Bridge Masonry and Scour repairs  £36,000 No progress 
U729/00/C71  Barry Burn Culvert Masonry and Scour repairs  £36,000 No progress 
U730/00/C37 Culvert Masonry and Scour repairs  £36,000 No progress 
C36/10 Nith Bridge Masonry parapet rebuild and
repairs to commence end of
August 2022 
£60,000 Consultant to
be appointed
for design via
SXL Held
pending
possible WF
proposals 
A70/100 Gatehouse Bridge Parapet heighten, scour repairs &
masonry repairs  £24,000 No progress 
A70/110/C46 Rose Burn Bridge Masonry and scour repairs  £24,000 No progress 
Broomknowe Retaining
Wall
Design in 2022/23, construction in
future years  £24,000 No progress 
W/MUIR/20 Muirkirk Shops
Retaining Wall Design in 2022/23, construction in future
years 
£24,000 No progress

Page 38

Structure
Reference
Structure Name Proposed Works Revised
Estimate
of Projects C/F
into 2022/23
Estimate
of new
projects
for
2022/23
Comment  Status
Parapet Upgrades 
A70/70  Burnock Bridge, Ochiltree  Parapet and other masonry repairs 
£216,000  Design
ongoing
Design 
A713/90  Dunaskin Bridge,
Waterside  Widening to create footway and replace
both masonry parapets - design ongoing. 
£70,000 
Tender delayed until
Spring 2023 due to
fish spawning
issues with river
working
Tender ready 
A735/20  Victoria Bridge, Kilmarnock Site works ongoing re  replacement of
substandard vehicle parapets; deck
expansion joints and paint superstructure,
waterproofing and resurfacing.Works
Substantially complete 
£570,000   Complete -
snagging 
Complete 
B743/80 Cleuch Bridge, Sorn Upgrade of parapets and install footway  £90,000  Design ongoing Programmed
A713/70/C53 Drumgrange Bridge Upgrade of parapets, masonry
repairs – works ongoing £6,000  Complete Complete
C134/10 Ranoldcoup Bridge, Darvel  Masonry repairs and heighten parapets  £24,000  £240,000  No progress 
B769/40 Corsehill Mill Bridge Parapet replacement – design in FY
2021/22  £12,000 No progress 
B7082/10 Townhead Bridge Parapet replacement  £150,000 No progress 
B743/135/C5
0 Beacon Hill Culvert Headwall Repairs   No progress 
W/NCUMN/1
0 Burnside Retaining Wall Replacement £36,000  Preliminary
Design
Design

Page 39

Structure
Reference
Structure Name Proposed Works Revised
Estimate
of Projects C/F
into 2022/23
Estimate
of new
projects
for
2022/23
Comment  Status
U8/00/C8 Hendryton Burn Culvert Scour and masonry repairs works on site. £48,000  Works ongoing Site       
Rail Incursion    
C23/10
Rigg Road Rail
Bridge,
Cumnock
Safety fencing - future year programme   No progress 
Non ARA  Council
Footbridges     
Various sites Design, investigation  £120,000 Minor repairs
ongoing 
F/HURL/10 Portland Brae
Footbridge
Load Assessment, paint and replace
concrete planks £230,000 
Consultant
completed
structural
assessment
and preparing
options for
refurbishment
Design
F/CATR/20 Institute Ave Footbridge,
Catrine Refurbishment £72,000  No progress 
Principal Inspections     
Various Principal Inspections of bridge stock by
consultant and in-house staff  £216,000 No progress 
TOTAL £3,037,000 £3,000,0
00    
TOTAL  (Estimated Carry Forward +
new allocation)
£6.037m

Page 40

APPENDIX 2: Traffic, Transportation and Road Safety Programmes 2022/23
(i) Road Safety Programme 
(ii) Safer Neighbourhoods 
Town Location Proposed Scheme
Mauchline Cowgate Traffic management review
Kilmarnock Prestwick Place, Fardalehill Traffic management 
Kilmarnock Sutherland Drive Traffic calming
Galston Cessnock Road at Bowling Club Pedestrian build-out
Mauchline Mansfield Road Traffic management review
Town/Route Location Proposed Scheme
Hurlford A71/B7073 roundabout AIP junction assessment
Kilmarnock Hurlford Road 30mph speed limit extension
Auchinleck Barony Road Speed Limit extension and gateway improvements
Dalmellington High Main Street, Churchill, Knowehead Road safety improvements
B742 Dalrymple B742 gateway entrance to Dalrymple Enhanced gateway features including vehicle activated sign
B7034 Hollybush Hollybush 30mph speed limit
A713 Waterside Waterside 50mph speed limit
Auchinleck Various Waiting restriction amendments
Lugton Dunlop Road Speed limit signing improvements
Galston Brewland Street Extension of 30mph speed limit
Kilmarnock A71 Campbell St off slip Signalisation assessment
Kilmarnock A71 West of Bellfield I/C Road safety signing
Stewarton Dunlop Road Pedestrian Refuge

Page 41

Stewarton Various roads 20mph speed limit orders amendments
Kilmarnock Whatriggs Road 20mph speed limit amendments
Cumnock Glaisnock Road Possible speed reduction measures
Kilmarnock Foregate Square Permanent pedestrianisation scheme
Various Various locations Vehicle activated signs upgrade 
(iii) Rural Route Action Plans 
Route Proposed Scheme
B778 B778 Fenwick to Stewarton Route Study 
(iv) Cycling, Walking and Safer Routes (CWSR) 
Town Location Proposed Scheme
Crosshouse/Kilmarnock  B7038 Kilmarnock to Crosshouse  Cycle route between Fardalehill and Crosshouse via hospital
Crookedholm Grougar Road  Grougar Rd localised road widening and pedestrian crossing facility
Fenwick Kirkton Rd/Main St – Fenwick PS  Pedestrian improvements/school street investigation
Dunlop A735 Lugton Road Pedestrian crossing improvements
Dalrymple B742 Barbieston Road Traffic calming and pedestrian crossing facilities
Mauchline Loudoun Street Pedestrian crossing assessment
Kilmaurs Main Street Improved pedestrian facilities
Crosshouse Crosshouse-Dundonald Cycle route feasibility study
Cumnock Netherthird School Streets Project
Newmilns Loudoun Road Pedestrian Crossing Investigation
Crosshouse B751 Gatehead Road Pedestrian Crossing Installation
Kilmarnock Kilmaurs Rd at Hillhead PS Pedestrian Crossing Installation
Darvel East Main St/Murdoch Road Junction sightline improvement
Various Various locations  Cycle and scooter parking at schools and other locations

Page 42

(v) Strathclyde Partnership for Transport (SPT) 
Location Project
Kilmarnock Phase 3 refurbishment of Kilmarnock bus station to upgrade concourse and stance areas.
Kilmarnock Glasgow Road bus park & ride 
Fenwick Footway improvements for access to X77 bus service 
(vi) SUSTRANS 
Location Project
Hurlford Hurlford Street Design Project
N/A East Ayrshire Active Travel Strategy 
Appendix 3 EV Chargers     
EAST AYRSHIRE PUBLIC CHARGERS      
CYC Ref Type Make Location Replacement Cost
51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £8,000
51210 22kw eVolt Foregate Car Park, James Shaw Crescent, Kilmarnock, KA1 1LU £9,000
50821 22kw eVolt Multi Storey Car Park, Kilmarnock, KA1 1LU £9,000
51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH £9,000
52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £9,000
52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB £30,000
52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000

Page 43

52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £9,000
52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £30,000
50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW £9,000
51170 Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £30,000
50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP £9,000
50815 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR £30,000
52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU £30,000
52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE £30,000
52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG £30,000
52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS £9,000
52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB £30,000
52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £9,000
52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ £8,000
52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB £9,000
52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000

Page 44

52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY £9,000
52962 Rapid eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £30,000
52963 22kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £9,000
53080 7kw eVolt Netherthird Community Centre, 65 Ryderston Drive, Cumnock, KA18 3AR £8,000
53778 Rapid eVolt Main Street Car Park, Muirkirk £30,000
53775 22kw eVolt Rose Reilly Sports Centre, Stewarton £9,000
53776 7kw eVolt Standalane Car Park, Stewarton £8,000
60786 7kW eVolt Academy Street, Hurlford £8,000
60732 22kW eVolt Drongan Centre car park, Mill of Shield Road £9,000
51210 22kW eVolt Carnshalloch Avenue car park, Patna £9,000
60250 22kW eVolt New Cumnock Outdoor Swimming Pool car park £9,000
60955 22kW eVolt Gatehead Road car park, Crosshouse £9,000
60924 7kW eVolt Queen Street car park, Kilmarnock £8,000
Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting final connections 7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting programme of
works 7kW eVolt Brown's Road car park, Newmilns £8,000     
EAST AYRSHIRE FLEET CHARGERS      
CYC Ref Type Man. Location £9,000
52043 22kw eVolt Transport Depot, Crookedholm £8,000
52044 7kw eVolt Transport Depot, Crookedholm £8,000
52045 7kw eVolt Transport Depot, Crookedholm £8,000
52046 22kw eVolt Cleansing Depot, Western Road, Kilmarnock £9,000
52047 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
52048 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
51897 7kw eVolt Holmquarry House, Kilmarnock £8,000
51914 7kw eVolt Holmquarry House, Kilmarnock £8,000
51881 7kw eVolt Croft Street, Kilmarnock £8,000
51882 7kw eVolt Croft Street, Kilmarnock £8,000

Page 45

51883 7kw eVolt Croft Street, Kilmarnock £8,000
52964 Rapid eVolt Croft Street, Kilmarnock £30,000
52950 7kw eVolt Strand Street, Kilmarnock £8,000
52951 7kw eVolt Strand Street, Kilmarnock £8,000
52952 7kw eVolt Strand Street, Kilmarnock £8,000
60797 7kw eVolt Holmquarry House, Kilmarnock £8,000
60798 7kw eVolt Holmquarry House, Kilmarnock £8,000
60799 7kw eVolt Holmquarry House, Kilmarnock £8,000 
7kw eVolt Ayr Road Council Depot, Cumnock £8,000 
7kw eVolt Ayr Road Council Depot, Cumnock £8,000 
7kw eVolt Ayr Road Council Depot, Cumnock £8,000
60083 22kW eVolt Croft Street, Kilmarnock £9,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000     
SOUTH AYRSHIRE CHARGERS        
CYC Ref Type Make Location  
51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW £8,000
51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU £8,000
51535 Rapid eVolt Burns Statue Square, Ayr, KA7 UT £30,000
52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN £9,000
52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY £9,000
50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £9,000
50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ £9,000
50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF £9,000
52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG £9,000

Page 46

50816 Rapid eVolt Girvan Harbour, Girvan, KA26 9AG £30,000
52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR £9,000
52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH £30,000
52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU £30,000
52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE £8,000
52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE £30,000
52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £30,000
52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL £30,000
53774 Rapid eVolt Academy Street, Troon £30,000
53773 Rapid eVolt Lodge Road Car Park, Turnberry £30,000
53777 22kw eVolt Burnside Road, Monkton £9,000
60793 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly £9,000
60081 22kw eVolt Inches Close car park, Maybole £9,000 
22kw eVolt Tarbolton Community Campus car park, Tarbolton £9,000
Awaiting commissioning 22kw eVolt Dundonald Primary School car park, Dundonald £9,000
60086 22kw eVolt Mossblown Activity Centre car park, Mossblown £9,000
60082 22kw eVolt Kirkoswald Main Street car park, Kirkoswald £9,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting programme of
works 22kW eVolt Barrhill Community car park, Main Street, Barrhill £9,000