Democracy Spraffa

3 Ayrshire Civil Contingencies Report

North Ayrshire Council · 2 December 2022
Back to Ayrshire Shared Services Committee — 2 December 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
South Ayrshire Council 
Report by Head of Legal, HR and Regulatory Services
to Ayrshire Shared Services Joint Committee
of 2 December 2022 
Subject: Ayrshire Civil Contingencies Team 
1. Purpose 
1.1 The purpose of this report is to advise the Joint Committee on proposals within the
current Ayrshire Civil Contingencies Team (ACCT) Service Plan for 2023/2024
(Appendix 1) noting work activity ongoing or achieved within 2022. 
2. Recommendation 
It is recommended that the Joint Committee: 
2.1 Approve the current Ayrshire Civil Contingencies Team (ACCT) Service Plan for
2023/2024 (Appendix 1) 
3. Background 
3.1 The ACCT has provided the civil contingencies services on behalf of the three
Ayrshire Councils since it was established in 2008. 
3.2 The Team has a responsibility to ensure the provision of the following key
requirements on behalf of the North, South and East Ayrshire Councils; 
• Operation of an on-call service to provide 24/7 response for Civil Emergencies
as the Duty Officer(s) on behalf of any of the affected Councils. 
• Preparation of a generic Civil Contingencies Response and Recovery Plan for
approval and implementation by each of the 3 Councils. 
• Maintenance of an accurate and up to date Emergency Contact Directory for
each of the 3 Councils. 
• Development and delivery of training programmes to ensure key staff within each
Council know and understand their emergency roles and are prepared to respond
to major incidents and civil emergencies. 
• Preparation and maintenance of Contingency Plans for specific sites, which are
also tested on a multi-agency basis at 3 yearly intervals. 
• Maintenance of a range of plans to cover the response to emergencies of non-
site specific risk.

Page 2

2
• Annual review of the Care for People Guidelines in conjunction with the three
Health and Social Care Partnerships. 
3.3 This work is routinely monitored and evaluated by a Steering Group comprising the
Head of Service from each Council with the responsibility for Civil Contingencies. 
4. Key Work Activity within 2022 
4.1 Staff absences have continued to impact the ACCT Work Plan during 2022; there
are a few areas of contingency planning work that were unable to be completed
within the previously agreed timescale. Where necessary and in agreement with the
Steering Group these have been rescheduled to later into 2022/2023. 
4.2 The recent focus of the Team has been the revision of the internal generic Civil
Contingencies Response and Recovery Plans, which have been drafted and await
approval by the Steering Group.   
4.3 The Emergency Contact Directory was updated and issued in June.  This document
contains the contact details for all the personnel who may need to be contacted to
respond to a major emergency. These are updated on a 6 monthly basis and will
be reissued again prior to the Christmas break. 
4.4 There has been continued focus in 2022 on internal training for those who will be
required to assume the roles of Council Incident Officers and Council Incident
Coordinators in the event of an emergency within any of the 3 Councils areas. 
4.5 The existing Civil Contingencies eLearning packages were revised in 2022. Two
new packages were also developed and launched including Council Incident Officer
and Civil Contingencies Awareness Training for Elected Members. 
4.6 During July 2022, the ACCT supported the Ayrshire Local Resilience Partnership’s
coordinated response to the Extreme Heat event.  The ALRP Disruptive Weather
Response Arrangements were used to assist partners share their information.   
4.5 An Avian Flu outbreak in the seabird population caused a large number to die and
be found washed up on our beaches.  This resulted in the ACCT, along with other
Council colleagues, the local NHS Public Health team and Animal Health 
representatives to convene a response group. They worked collaboratively to
support the teams undertaking the clean-up operation on the beaches, to share the
public information messaging and to ensure the safety of all those working on or
enjoying the beaches this summer. 
4.6 Two additional ALRP multi-agency tactical groups have been established to
consider the consequences and response across Ayrshire to the Ukrainian Refugee
situation and the Cost of Living Crisis. These are ongoing and chaired by Council
Chief Officers. 
4.6 The work to prepare for a Power Resilience emergency continues within the 3 Local
Authorities and all Council services are required to consider and plan for alternative
models of service delivery during this type of incident. 
4.7 A number of the External Plans are undergoing their 3 yearly review and will be
tested through the exercise process before the end of 2022/23, as per the attached
ACCT Work Plan (Appendix 1).

Page 3

3
5. Proposals 
5.1 It is proposed that the Joint Committee approves the current ACCT Service Plan
2023/2024, detail of which is attached as Appendix 1. 
5. Legal and Procurement Implications 
5.1 The recommendations in this report are consistent with legal requirements. 
5.2 There are no procurement implications arising from this report. 
6. Financial Implications 
6.1 Not applicable. 
7. Human Resources Implications 
7.1 Not applicable. 
8. Risk 
8.1 Risk Implications of Adopting the Recommendations 
8.1.1 There are no risks associated with adopting the recommendations. 
8.2 Risk Implications of Rejecting the Recommendations 
8.2.1 Rejecting the recommendations may give rise to external criticism, breach
of statute or legal challenge. 
9. Equalities 
9.1 The proposals in this report allow scrutiny of performance.  The report does not
involve proposals for policies, strategies, procedures, processes, financial
decisions and activities (including service delivery), both new and at review, that
affect the Council’s communities and employees, therefore an equality impact
assessment is not required. Any specific island issues are considered in the report.  
10. Sustainable Development Implications  
10.1 Considering Strategic Environmental Assessment (SEA) - This report does not
propose or seek approval for a plan, policy, programme or strategy or document
otherwise described which could be considered to constitute a plan, programme,
policy or strategy.  
11. Options Appraisal 
11.1 An options appraisal has not been carried out in relation to the subject matter of this
report.

Page 4

4 
12. Link to Council Plan 
12.1 The matters referred to in this report contribute to the delivery of all Council strategic
objectives. 
13. Results of Consultation 
13.1 There has been no public consultation on the contents of this report 
Person to Contact Carol Boyd – Service Lead - Risk and Safety, South Ayrshire Council
River Terrace, Ayr
Phone 01292 613090
E-mail carol.boyd@south-ayrshire.gov.uk
Date: 6 November 2022

Page 5

5
Ayrshire Civil Contingencies Team – Service Plan (2023/24) - Appendix 1

Page 6

6
Introduction 
1.1 The Ayrshire Civil Contingencies Service Plan covers the period 2023/2024 and sets out what
we intend to achieve over the next year based on the resources available to us. 
1.2 Effective Contingency Planning is crucial to the achievement of the combined objectives of
North, South and East Ayrshire Councils and the success of the strategic operation and delivery
of all Council Services. The Ayrshire Civil Contingencies Team (ACCT) is responsible for
developing and delivering a work plan that ensures compliance in respect of statutory obligations
and endeavours to support all Council services embed robust contingency planning
arrangements. The team will support the 3 Councils and relevant multi-agency partners to
ensure that response and recovery in the event of adverse incidents is efficient and carefully
planned.   
1.3 Actions have been formulated and form the basis of the ACCT Work Plan. This is reported on
and scrutinised quarterly by the Ayrshire Civil Contingencies Steering Group comprising of the
Head of Service from each Council with the responsibility for Civil Contingencies.  The 3 Ayrshire
Council Shared Service Joint Committee has a remit to approve the plan and/or progress made
on a 6 monthly basis. We have agreed challenging targets for the team in order to continuously
improve the way we work and to take account of the statutory obligations imposed on all 3
Councils as Category 1 responders in line with Civil Contingencies legislation. 
1.4 By planning and monitoring our progress for 2023-2024 we aim not only to contribute to the
achievement of the strategic objectives of the 3 Ayrshire Councils but also support our
colleagues within Health and Social Care, NHS Ayrshire and Arran, the Emergency Services
and a wide range of multi- agency responders. These partners form the core membership of the
Ayrshire Local Resilience Partnership (ALRP). 
2 Profile
2.1 The Ayrshire Civil Contingencies Team has a responsibility to ensure the provision of the
following key requirements on behalf of the 3 Councils; 
• Operation of an on-call service to provide 24/7 response for Civil Emergencies as the
Duty Officer(s) on behalf of any of the affected Councils.
• Preparation of a generic Civil Contingencies Response and Recovery Plan for approval
and implementation by each of the 3 Councils.
• Maintenance of an accurate and up to date Emergency Contact Directory for each of
the 3 Councils.
• Development and delivery of training programmes to ensure key staff within each
Council know and understand their emergency roles and are prepared to respond to
major incidents and civil emergencies.
• Preparation and maintenance of Contingency Plans for specific sites, which are also
tested on a multi-agency basis at 3 yearly intervals.
• Maintenance of a range of plans to cover the response to emergencies of non-site
specific risk.
• Annual review of the Care for People Guidelines in conjunction with the three Health
and Social Care Partnerships. 
2.2 To date the service is working within an overall net revenue budget for the team of £196,712.09
(2022-2023) and is delivered utilising a workforce of 3.5 FTE.

Page 7

7 
3 How are we doing?
3.1 Demanding performance targets are set through the Performance Development and Review
(PDR) process, this helps us embed a culture of improvement within the team and aims to 
ensure the achievement of outcomes within the Service Plan. These are further articulated
through team meetings where assigned activities are monitored and assessed. Prioritising
workloads and establishing clear deadlines are key features on the allocation of tasks. 
3.2 The Team’s performance is tracked and measured using the South Ayrshire Council
Performance Management System approach, and new initiatives progressed where any need
for improvement is identified. The team are actively supported and encouraged to consider
opportunities to introduce new and innovative ways of working. 
3.3 There has been an investment in training for the team and officers have the opportunity to
attend external events and participate in a range of external or multi-agency forums which help
ensure knowledge of best practice in Civil Contingencies. 
3.4 Areas identified for improvement are being taken forward and these include more regular
refresher training opportunities for key Council managers and the further development of
online E Learning training in Civil Contingencies to extend the reach and breadth of core skills
across a wider range of participants within North, South and East Ayrshire Councils. 
4. The challenges we face
4.1 These are outlined as follows: - 
• External
An increase in adverse and concurrent incidents, emergency or weather events stretch
existing resources in terms of ensuring that Civil Contingencies responses are well planned
and tested. Additional high-profile events, which rely on Council support also place
considerable pressure on available time and expertise. 
• Internal
Conflicting priorities and resourcing pressures across a number of service areas can expose
gaps in terms of demonstrating a fully corporate approach to the implementation of well
embedded Contingency Planning.  There can often be challenges in terms of persuading
services of the business benefits in preparing and testing contingency plans. 
5. Detailed Service Plan
5.1 The strategic outcomes for all 3 Councils are underpinned by having robust processes for risk
management and resilience. How we intend to contribute to the successful achievement of the
3 Ayrshires’ objectives is set out in the detail in the ACCT Service Plan on the following pages.   
6. Governance
6.1 The progress made by the ACCT is analysed on a quarterly basis by the 3 Council Civil
Contingencies Steering Group. The Service Plan will be developed on an annual basis and
subject to approval and scrutiny by the Shared Service Joint Committee.

Page 8

8
Ayrshire Civil Contingencies Team - Work Plan
The following tables outline key contingencies plans, training and exercises for the Civil Contingencies Team.
It includes work activity ongoing or completed within 2022 and further actions for 2023-2024. The ACCT is
either leading on these or providing support to other agencies on their development.  It also includes reference
to Civil Contingencies sub-groups which may be contributed to by ACCT. 
Internal Plans / Training and Exercises led by ACCT Target Date for
completion 
Civil Contingencies Response & Recovery - SAC (Review) S Awaiting approval 
Civil Contingencies Response & Recovery – NAC (Review) N Awaiting approval
Local Incident Room Guidelines – SAC (Exercise) S November 2022
Local Incident Room Guidelines - NAC (Exercise) N December 2022
Major Accident Hazard Gas Pipelines - Ayrshire Plan (Review and Exercise) N S E  March 2023 (D)
Shoreline Response Plan (Develop) N S March 2023
Care for People – Emergency Support Centres Guidelines (Review & Exercise) N S E  Jan 2023
Black Start and Power Resilience Recovery (Councils) N S E March 2023
Emergency Contact Directories (biannual updates June and December) N S E  Ongoing 
Internal Plans / Training and Exercises led by ACCT – completed for
22/23 
Civil Contingencies Response & Recovery – EAC (Review) E Complete
Local Incident Room / Emergency Control Centre – EAC (Training) E No longer required
Mobile Telephone Privileged Access System (MTPAS) N S E  Complete
eLearning package for Community Support Centres / Care for People Awareness N S E Complete
eLearning package for Civil Contingencies Awareness N S E N S E Complete
eLearning Civil Contingencies package for Elected Members (Develop)  N S E Complete
Former Station Hotel, Ayr - Major Incident Response Guide (MAIRG) S  Complete
Wm Grants External Contingency Plan (Review & Exercise) S  Complete
Pandemic Influenza Plan  N S E Complete
Fuel Disruption Plan - Fleet Management  N S E Complete
Chemring, Stevenston External Contingency Plan (Review & Exercise) N  Complete
The above Plans / Training will be reviewed again prior to financial year end 2023/24. Target dates will be
provided in March 2023 via the Ayrshire Shared Service Panel Update report. Any additional work activity
identified will also be included within the report.   
External Plans / Training and Exercises led by ACCT  Target Date for
completion
Defence Munitions Beith External Contingency Plan (Review & Exercise)  N Dec 2022
Hunterston B Offsite Contingency Plan (Review and Exercise) N Jan 2023
Hunterston B Offsite Contingency Plan (Redacted Version) N Jan 2023
DSM (Dutch State Mining) Nutritional Products Contingency Plan (Review & Exercise) N March 2023(D)
Chivas Brothers – Balgray and Willowyard (Review & Exercise) N  2023/2024
Spaceport COMAH Plan  (prepared in conjunction with identified partner) S  Sept 2023 
External Plans / Training and Exercises - Working with
Multi Agency Partners  
Lead  Target Date for
completion
Hunterston B – Training and Exercising Programme N EDF Ongoing
Black Start and Power Resilience Recovery (Multi Agency) MA  ALRP   Ongoing
Radiation Monitoring Unit Arrangements N ALRP Dec 2022
Arran Multi-Agency Response Plan N MA  ALRP Dec 2022
Joint Health Protection Plan MA NHS  Dec 2022 
WoSRRP Mass Fatalities Arrangements - (Review and Exercise) MA WoSRRP Jan 2023
Marine Pollution Response Plan - Girvan Harbour (Biannual Notification
Exercise, Review Plan & Table Top Ex Carrick) S MA
ARA  Complete
Animal Health MAIRGs (Review) MA EH&TS  Complete
Glasgow Prestwick Airport Multi Agency Contingency Plan  S MA GPA Complete
Ayrshire Safer Shores Initiative Response Arrangements N S MA Police Complete
ALRP Disruptive Weather Response Arrangements MA ALRP Complete 
Supported Tasks - Participation at Sub Groups Lead
Agency Update
Community and Business Resilience Sub Group (developing and sharing
best practice) MA WoSRRP Ongoing
Training, Exercising and Learning Sub Group (developing and sharing best
practice) MA WoSRRP Ongoing
Warning and Informing the Public – Media Plans, Websites MA Councils Ongoing
Ukraine Tactical ALRP Sub Group  MA Councils Ongoing
Cost of Living Tactical Sub-Group  MA Councils Ongoing

Page 9

9
ALRP Power Resilience MA Councils Ongoing
Provide Secretariat to Ayrshire Local Resilience Partnership (ALRP) MA ACCT Ongoing
Community Resilience (provide advice and support to local community
councils and resilience groups – ad hoc) MA ACCT Ongoing 
Colour coded abbreviations
Work undertaken on behalf of North Ayrshire  N
Work undertaken on behalf of South Ayrshire S
Work undertaken on behalf of East Ayrshire E
Work undertaken on behalf of ALRP or other agencies  MA (Multi Agency) 
Plans, Procedures and Guidelines 
It is important to note that by its very nature Civil Contingencies work activity is often reactive and
the team endeavour to respond to events and circumstances as they arise. The Councils’ Civil
Contingencies Response and Recovery Plans are deliberately generic and provide a framework
which allows for speedy response to emergencies as they arise. The Service Plan will therefore be
regularly updated as and when required. 
Copies of the ACCT and other resilience documents are hosted on each Council’s Resilience Direct
page and on their shared drive system - access is limited to those who have a key role responding
to an emergency - the links are noted below. 
South Ayrshire - ACCT on Sharepoint  East Ayrshire - ACCT on Shared Drive 
North Ayrshire - on Resilience Direct 
Update Prepared – 06/11/22