Agenda Document Pack - Ayrshire Shared Services Committee - 02/09/2022

North Ayrshire Council · 2 September 2022
Back to Ayrshire Shared Services Committee — 2 September 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Ayrshire Shared Services Committee 
A Meeting of the Ayrshire Shared Services Committee of North Ayrshire Council will
be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Friday, 02 September 2022 at 10:00 to consider the undernoted
business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior arrangement, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Presentation:  Strathclyde Partnership for Transport
Receive a presentation from Strathclyde Partnership for Transport 
3 Revenue Financial Monitoring Report
Submit report by the Head of Finance and ICT on the revenue budget
monitoring position for the year to 31 March 2022, for the Ayrshire Roads
Alliance and also the budget for 2022-23 (copy enclosed). 
4 Internal Audit Annual Update
Submit report by the Chief Auditor providing an update of internal audit
work to the ASSJC, internal audit outcomes since the inception of
Ayrshire Roads Alliance and items included in the current year plan (copy
enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 Roads Programme 2022/23
Submit report by the Head of Roads on the progress of work through the
roads improvement programmes within East Ayrshire and South Ayrshire
for financial year 2022-2023 (copy enclosed). 
6 Winter Service Review
Submit report by the Head of Roads on the Review of the Winter Service
for 2021/22 (copy enclosed). 
7 Procedure relating to the inspection of Ayr South Pier
Submit report by the Head of Roads on the proposed
procedure relating to the inspection of Ayr South Pier (copy enclosed) 
8 Risk Report and Register
Submit report by the Head of Roads on the management of risk
associated with the Ayrshire Roads Alliance (copy enclosed). 
9 Performance Scorecard
Submit report by the Head of Roads on the progress made to date
against the Performance Scorecard (copy enclosed). 
10  Improvement Action Plan
Submit report by the Head of Roads on the management of the
Improvement Action Plan with the Ayrshire Roads Alliance (copy
enclosed). 
11  Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Ayrshire Shared Services Committee Sederunt 
North Ayrshire Council
Marie Burns
Joe Cullinane
Scott Davidson
Tom Marshal
East Ayrshire Council
Neal Ingram
Maureen McKay
Douglas Reid
Neill Watts
South Ayrshire Council
Alec Clark 
Ian Davis 
William Grant 
Philip Saxton 
Chair: 
Apologies: 
Attending: 
4

Page 5

CLASSIFICATION: PUBLIC 
THE AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
2nd SEPTEMBER 2022 
AYRSHIRE ROADS ALLIANCE
REVENUE FINANCIAL MONITORING REPORT 
Report by Head of Finance and ICT 
PURPOSE OF REPORT 
1 The purpose of this Report is to update the Joint Committee on the revenue
budget monitoring position for the year to 31 March 2022, for the Ayrshire
Roads Alliance and also the budget for 2022-23. 
2 It is recommended that the Joint Committee 
(i) Note the financial management position of the Ayrshire Roads
Alliance for 2021-22.
(ii) Notes detail of the 2022-23 Ayrshire Roads Alliance revenue budget
(iii) Requests a further financial update at the next meeting of the Joint
Committee.
(iv) Otherwise, notes the content of this Report 
REVIEW OF FUNDING MECHANISM 
3 The Joint Committee approved a Report on 23 May 2014 describing the budget
monitoring arrangements for the Ayrshire Roads Alliance. 
4 As part of the Detailed Business Case the service budget is split between
strategic service delivery and local service delivery.  This separates out the
core/recurring costs of service delivery from the local service costs at a single
Council level.  This ensures that decisions on the level of local spend remain
with local Members, and ensures that the local Members retain control of their
local roads budgets.  Appendix 1 provides a breakdown of this split. 
5 At its meeting of 19th February 2016, Committee agreed a change to how
Strategic Service Delivery would be allocated between the two Councils. A
smaller group of core Strategic Delivery staff have been identified and their
costs continue to be split equally. The remaining Strategic Delivery costs would
be apportioned in line with Local Delivery budget inputs plus actual capital
expenditure in-year.   
BUDGET MONITORING POSITION 
6 The overall outturn for 2021-22 is £1.656m less than budget. 
7 Strategic Delivery out-turn is £0.994m less than budget.
Agenda Item 3
5

Page 6

CLASSIFICATION: PUBLIC 
Strategic Service Delivery Combined
(£m)
Budget 4.231
Outturn 3.237
Variance (0.994) 
8 East Ayrshire Local Delivery out-turn is £0.466m less than budget and South
Ayrshire Local Delivery £0.196m greater than budget. 
IMPACT OF COVID 
9 Covid 19 has had a significant impact on Ayrshire Roads Alliance. Parking
income was £1.726m less than budget (£1.003m in East Ayrshire, £0.723m in
South Ayrshire). Within East Ayrshire £1.061m of lost income and additional
expenditure was removed from the service and offset by covid funding and
balances. The shortfall within South Ayrshire is netted against surpluses
achieved in previous years.     
10 Summary information is provided in the table below. A full budget monitoring
statement, including reasons for major variances is attached at Appendix 2.    
Service Division
Annual Estimate
2021/22           
£m
Projected
Actual to 31/3/22            
£m
Variance
(Favourable) /
Adverse       
£m
STRATEGIC DELIVERY 4.231 3.237 (0.994)
LOCAL DELIVERY - EAST AYRSHIRE 5.063 4.597 (0.466)
LOCAL DELIVERY - SOUTH AYRSHIRE 4.057 3.861 (0.196)
TOTAL 13.351 11.695 (1.656) 
11 The position for each Council is shown below: 
EAC
(£m)
SAC
(£m)
TOTAL
(£m)
Strategic Delivery (0.500) (0.494) (0.994)
Local Delivery (0.466) (0.196) (0.662)
2020-21 Variance (0.966) (0.690) (1.656) 
TIMBER TRANSPORT 
12 At the meeting of the Joint Committee on 23rd June 2017, further information
was requested in relation to timber transport funding. The undernoted table
provides an analysis of relevant project and Timber Transport contributions for
2021-22. 
6

Page 7

CLASSIFICATION: PUBLIC 
2021-22
Actual to
date(£m)
East Ayrshire 
Expenditure on Projects £0.429
Timber Transport
Contribution
£0.214 
2021-22
Actual to
date(£m)
South Ayrshire 
Expenditure on Projects £0.701
Timber Transport
Contribution 
£0.490 
BUDGET REALIGNMENT  
13 In June 2017 South Ayrshire Council Internal Audit issued a report –
“Ayrshire Roads Alliance: Review of South Ayrshire Council Monitoring
Procedures”. 
14 The report contains a recommendation “Executive Director (Economy,
Neighbourhood and Environment) to request ARA management to present a
budget statement showing any adjustments made between subjective budget
headings to the ASSJC for information”. 
15 This relates to the setting of 2022-23 ARA budgets. The budget is created by
adding inflation and savings targets to a base budget (the base budget being
the 2021-22 budget). The budget is then discussed with ARA management
who have the opportunity to move funds based on the anticipated spend in
the forthcoming year. In order to facilitate this exercise ARA management also
considered 2021-22 outturn figures. No changes were made to Strategic,
Local Delivery – East or Local Delivery – South net expenditure budget
allocations. 
16 An analysis of budget movement between 2021-22 and 2022-23 budget
allocations along with an explanation of those movements is provided at
Appendix 3. 
FINANCIAL IMPLICATIONS 
17 The final revenue budget for the Ayrshire Roads Alliance for 2021-22 was
£13.351m, inclusive of one-off covid funding totalling £1.243m. Actual
expenditure was £11.695m. Ayrshire Roads Alliance budget for 2022-23 is
£12.547. The budget will continue to be monitored and reported to the Joint
Committee. 
7

Page 8

CLASSIFICATION: PUBLIC 
LEGAL IMPLICATIONS 
18 The work of the Ayrshire Roads Alliance is undertaken in accordance with 
relevant legislation. 
HUMAN RESOURCES IMPLICATIONS 
19 The establishment of the Ayrshire Roads Alliance is dependent on the available
budget. Available budget and human resource requirements will be reviewed
as part of budget monitoring. 
COMMUNITY / COUNCIL PLAN IMPLICATIONS 
20 The work undertaken by the Ayrshire Roads Alliance aligns with the Community
Plan for East Ayrshire Council; and the Council Plan for South Ayrshire Council. 
RISK MANAGEMENT IMPLICATIONS  
21 Appropriate financial monitoring arrangements are in place to mitigate risk. 
This is included in the Ayrshire Roads Alliance Risk Register.  Regular meetings
are held between relevant finance staff and the Ayrshire Roads Alliance. 
LIST OF APPENDICES 
Appendix One - Split between Strategic and Local Service Delivery
Appendix Two - Financial Monitoring Report
Appendix Three – Analysis of Movements in Budgets 2021-22 to 2022-23 
BACKGROUND PAPERS 
None 
For further information on this report, please contact Kevin Braidwood, Head of Roads
- Ayrshire Roads Alliance on 01563 503164 
Implementation Officer: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
on 01563 503164
8

Page 9

CLASSIFICATION: PUBLIC 
Appendix 1 – Split Between Strategic and Local Service Delivery
Strategic Service Delivery Local Service Delivery
Transportation, Development Control
and Road Safety
Local Transport Strategy; Transportation
Policy; Road Safety Plan; Travel Planning,
Cycling Strategy; Planning Applications;
Road Construction Consents; Development
Planning, Council/Partner  Liaison, Section
75 Agreements;  Road Safety Schemes;
Road Safety Audits;  School Travel Plans;
School Crossing Patrol; Road Safety
Education. 
Transportation, Development
Control and Road Safety
Maintenance of Bus Shelters; Split
Cycle Offset Optimisation Technique
(SCOOT) systems (an adaptive
control system for controlled road
crossings); Development Control;
Bus Shelter Advertising;
Shopmobility; Construction of Road
Safety Schemes. 
Asset, Traffic and Parking
Asset Management Plan; Roads
Improvement Plan; Infrastructure Surveys;
Inventory Management; Scottish Roadworks
Register; Issue of Permits; Performance
Monitoring; Accident Investigation and
Prevention; Traffic Orders; Traffic Counts;
and Parking Strategy. 
Asset, Traffic and Parking
Maintenance of Traffic signals, traffic
signs, Car Park Maintenance and
Parking Enforcement.
Design and Environment
Flood Risk Management Strategy; Flood
Risk Management Plans; Watercourses;
Flood Mitigation; Coastal Protection;
Inspection  of Piers & Harbours; Bridge
Inspections and Maintenance; Structural
Assessments; Technical Approval; 
Abnormal Load Routing; and Design of
Major and Minor Road Schemes and
Improvements. 
Design and Environment
Maintenance of Watercourses,
Bridges, Retaining Walls, Piers and
Harbours. 
Operations
Carriageway Inspections; Winter Service
Planning; Programming of Proactive,
Reactive and Cyclic Maintenance; Street
Lighting Design and Management; and
Festive Lighting.
Operations
Proactive, Reactive, Cyclic
Maintenance of Roads and
Footways; Winter and Weather
Emergency Service; Proactive and
Reactive Maintenance of Streetlights;
Electricity costs for streetlights. 
Support Services        
HR, Finance, ICT, and Administrative
Support. 
9

Page 10

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY
CLASSIFICATION: OFFICIAL-PROTECT 
SERVICE SUMMARY - OVERVIEW POSITION 
Ayrshire Roads Alliance outturn was £1.656m less than budget. 
Actual
Expenditure as
at P13           
£m
Actual
Expenditure as
% of Ann. Est.         
£m
Service Division
Annual
Estimate
2021/22           
£m
Projection to
31/3/22            
£m
Variance
(Favourable) /
Adverse        £m
1.975 46.7% STRATEGIC DELIVERY 4.231 3.237 (0.994)
3.681 72.7% LOCAL DELIVERY - EAST AYRSHIRE 5.063 4.597 (0.466)
3.388 83.5% LOCAL DELIVERY - SOUTH AYRSHIRE 4.057 3.861 (0.196)
9.044 67.7% TOTAL 13.351 11.695 (1.656)
DISCRETIONARY COVID-19 FUNDING 0.000 0.000 0.000
TOTAL FOLLOWING LINE BY LINE REVIEW 13.351 11.695 (1.656)
EARMARKED FUNDS TO BE CARRIED FORWARD 0.000 0.000 0.000
9.044 67.7% TOTAL INCLUDING EARMARKED FUNDS 13.351 11.695 (1.656)
STRATEGIC DELIVERY 
This variance mainly reflects staff turnover savings due to vacant posts (£0.318m),
reduced insurance costs relating to ARA South (£0.113m), savings on computing and
communications costs (£0.073m) and a reduced provision for bad and doubtful debts
(£0.218m) along with additional income (£0.406m). This is partly offset by severance costs
(£0.117m). 
LOCAL DELIVERY – EAST AYRSHIRE
This mainly reflects vacancies and turnover (£0.558m), along with savings on transport
costs (£0.040m), and supplies and services (£0.028m). This is partly offset by additional
debt charges in respect of purchased vehicles (£0.099m) and LED street lighting
replacement programme (£0.059m), along with additional sub-contractor costs (£0.046m). 
LOCAL DELIVERY – SOUTH AYRSHIRE
This variance mainly reflects Savings on staff costs (£0.183m), particularly in relation to
vacancies, partly offset by additional overtime costs, along with savings on dredging at
Girvan Harbour (£0.105m) and Coastal Protection (£0.050m) and additional income
(£0.099m). This is partly offset by additional debt charges as a result of purchased
vehicles (£0.087m) and additional expenditure on depot repairs (£0.049m), computing
(£0.044m) particularly in relation to the migration of WDM system, equipment and
materials (£0.059m) and consultancy costs (£0.050m), particularly in relation to new
junctions at Troon and Barassie. 
10

Page 11

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY
CLASSIFICATION: OFFICIAL-PROTECT 
STRATEGIC DELIVERY 
Actual
Expenditure as
at P13           
£m
Actual
Expenditure as
% of Ann. Est.         
£m
Service Division
Annual
Estimate
2021/22           
£m
Projection to
31/3/22            
£m
Variance
(Favourable) /
Adverse        £m
2.431 60.1% EMPLOYEE COSTS 4.044 3.863 (0.181)
0.021 52.5% PREMISES COSTS 0.040 0.026 (0.014)
0.014 53.8% TRANSPORT COSTS 0.026 0.023 (0.003)
0.169 18.2% SUPPLIES & SERVICES 0.927 0.530 (0.397)
0.000 0.0% THIRD PARTY PAYMENTS 0.000 0.000 0.000
0.015 0.0% DEBT CHARGES 0.008 0.015 0.007
2.650 52.5% TOTAL EXPENDITURE 5.045 4.457 (0.588)
-0.675 82.9% INCOME -0.814 -1.220 (0.406)
1.975 46.7% NET EXPENDITURE 4.231 3.237 (0.994)
DISCRETIONARY COVID-19 FUNDING 0.000 0.000 0.000
TOTAL FOLLOWING LINE BY LINE REVIEW 4.231 3.237 (0.994)
EARMARKED FUNDS TO BE CARRIED FORWARD 0.000 0.000
1.975 46.7% TOTAL INCLUDING EARMARKED FUNDS 4.231 3.237 (0.994)
11

Page 12

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
AS AT 31 MARCH 2022 
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
Projected
Variance at     
31 March
2021
(£m)
Strategic Delivery
(0.181) 
(0.014) 
(0.397) 
(0.406) 
0.004 
Employee Costs
This saving reflects vacant posts and turnover savings (£0.318m). This is
partly offset by additional severance (£0.117m), modern apprentice
(£0.010m), and overtime (£0.013m) costs. 
Premises Costs
This variance reflects a saving on metered water charges. 
Supplies & Services
This variance mainly reflects a saving on South Ayrshire insurance
charges (£0.113m) and a reduced provision for bad and doubtful debts
(£0.218m) along with reduced computing costs (£0.073m). This is partly
offset by a number of small variances (£0.007m) 
Income
This variance reflects additional income from fees, notices and
inspections (£0.243m) along with reserves held by ARA South (£0.178m).
This is partly offset by a shortfall in capital recharge income(£0.018m) 
Other Variances
This represents other non-material variances within Strategic Delivery.
(0.994) Total reported variance 
12

Page 13

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
AS AT 31 MARCH 2022 
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
LOCAL DELIVERY – EAST AYRSHIRE 
Actual
Expenditure as
at P13           
£m
Actual
Expenditure as
% of Ann. Est.         
£m
Detail
Annual
Estimate
2021/22           
£m
Projection to
31/3/22            
£m
Variance
(Favourable) /
Adverse        £m
2.431 60.1% EMPLOYEE COSTS 4.044 3.863 (0.181)
0.021 52.5% PREMISES COSTS 0.040 0.026 (0.014)
0.014 53.8% TRANSPORT COSTS 0.026 0.023 (0.003)
0.169 18.2% SUPPLIES & SERVICES 0.927 0.530 (0.397)
0.000 THIRD PARTY PAYMENTS 0.000 0.000 0.000
0.015 187.5% DEBT CHARGES 0.008 0.015 0.007
2.650 52.5% TOTAL EXPENDITURE 5.045 4.457 (0.588)
(0.675) 82.9% INCOME (0.814) (1.220) (0.406)
1.975 46.7% NET EXPENDITURE 4.231 3.237 (0.994)
PROPOSED REDUCTION FOLLOWING LINE BY LINE 0.000 0.000 0.000
TOTAL FOLLOWING LINE BY LINE REVIEW 4.231 3.237 (0.994)
EARMARKED FUNDS TO BE CARRIED FORWARD 0.000 0.000
1.975 46.7% TOTAL INCLUDING EARMARKED FUNDS 4.231 3.237 (0.994)
13

Page 14

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
Projected
Variance at   
31 March
2021
(£m)
Local Delivery - East Ayrshire 
(0.591)                                               
0.010 
(0.040) 
(0.028)                                                           
0.046                                               
0.159 
(0.022) 
Employee Costs
This variance mainly reflects staff turnover due to vacant posts (£0.558m), a saving on
modern apprentice costs (£0.020m) and employee recharges in respect of cross
boundary working (£0.042m), partly offset by additional training costs (£0.035m). 
Premises Costs
This variance mainly reflects the rental of Queen Street Car Park (£0.004m) along with
additional utility costs (£0.005m) 
Transport Costs
This variance mainly reflects savings on vehicle and plant hires (£0.023m) along with
fuel (£0.020m) 
Supplies & Services
This variance mainly reflects a reduction in roads maintenance (£0.140m) and street
lighting (£0.023m) materials, along with a reduced provision for bad and doubtful debts
(£0.024m). This is partly offset by additional IT costs (£0.079m), particularly in relation
to the migration of WDM System (£0.030m), along with street lighting electricity
(£0.030m) costs and expenditure on Smarter Choices Smarter Places project
(£0.057m). 
Third Party Payments
This variance mainly reflects additional within Traffic (£0.119m) – mainly offset by
additional income in relation to the former Mothercare site in Kilmarnock and COP26. 
Finance Costs
This variance reflects the purchase of new vehicles, particularly within Roads
Maintenance (£0.099m) along with spend to save debt charges in respect of LED
street lighting programme (£0.059m). 
Income
This variance mainly reflects income in relation to COP26 (£0.066m) and the former
Mothercare site in Kilmarnock (£0.043m), along with additional recharges to the capital
programme (£0.226m). This is partly offset bu shortfalls in raods maintenance
(£0.266m) and car parking (£0.038m) income. 
(0.466) Total reported variance 
14

Page 15

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
LOCAL DELIVERY – SOUTH AYRSHIRE 
Actual
Expenditure as
at P13           
£m
Actual
Expenditure as
% of Ann. Est.         
£m
Detail
Annual
Estimate
2021/22           
£m
Projection to
31/3/22            
£m
Variance
(Favourable) /
Adverse        £m
0.000 #DIV/0! EMPLOYEE COSTS 0.000 0.000 0.000
0.000 #DIV/0! PREMISES COSTS 0.000 0.000 0.000
0.000 #DIV/0! TRANSPORT COSTS 0.000 0.000 0.000
0.000 #DIV/0! SUPPLIES & SERVICES 0.000 0.000 0.000
0.000 THIRD PARTY PAYMENTS 0.000 0.000 0.000
0.000 DEBT CHARGES 0.000 0.000 0.000
0.000 #DIV/0! TOTAL EXPENDITURE 0.000 0.000 0.000
0.000 #DIV/0! INCOME 0.000 0.000 0.000
0.000 #DIV/0! NET EXPENDITURE 0.000 0.000 0.000
EARMARKED FUNDS TO BE CARRIED FORWARD 0.000 0.000
0.000 #DIV/0! TOTAL INCLUDING EARMARKED FUNDS 0.000 0.000 0.000
15

Page 16

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
Projected
Variance at   
31 March
2021
(£m) 
Local Delivery - South Ayrshire 
(0.183) 
0.061 
0.095 
(0.158) 
0.087 
(0.099) 
0.001 
Employee Costs
This variance mainly reflects staff turnover due to vacancies (£0.320m),
partly offset by employee recharges in relation to cross boundary working
(£0.043m), overtime (£0.091m) and training costs (£0.011m).
Premises Costs
This variance reflects depot repairs (£0.049m), along with rates and
utilities charges (£0.021m), partly offset by reduced waste collection
charges (£0.008m).
Supplies & Services
This variance mainly reflects additional computing costs (£0.044m) particularly
in relation to the migration of WDM System (£0.030m) along with
additional expenditure on equipment and materials (£0.059m), weather
forecasting services (£0.019m) and consultancy costs (£0.050),
particularly in relation to new junctions at Troon and Barassie. This is
partly offset by .refunds in relation to Street Lighting Electricity charges
(£0.038m) and a lower than anticipated provision for bad and doubtful
debts (£0.040m). 
Third Party Payments
This variance reflects savings in relation to dredging at Girvan Harbour
(£0.105m) and coastal protection (£0.081m). This is partly offset by
additional sub-contractor costs (£0.015m), particularly in relation to street
lighting and additional car park cleaning costs (£0.013m).
Debt Charges
This variance reflects the purchase of new vehicles, particularly within Roads
Maintenance
Income
This variance mainly reflects additional parking (£0.287m), street lighting
(£0.084m) and harbour (£0.020m) income. Additional capital fee income reflects
additional investment by South Ayrshire Council (£0.067m). Additional traffic
income (£0.088m) mainly relates to Active Travel, A70 junction improvements
and Tourist and visitor facilities. This is partly offset by a shortfall in roads
maintenance income (£0.462m) 
Other Variances
This variance reflects non-material variances within Local Delivery – South Ayrshire 
(0.196) Total reported variance
16

Page 17

APPENDIX 2
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
DATE 2 SEPTEMBER 2022
2021/22 GENERAL SERVICES REVENUE BUDGET
OUTTURN POSITION AS AT 31 MARCH 2022
AYRSHIRE ROADS ALLIANCE
FINANCIAL PERFORMANCE SUMMARY 
CLASSIFICATION: OFFICIAL-PROTECT 
17

Page 18

Appendix 3
Ayrshire Roads Alliance
Analysis of Movements in Budgets 2021-22 to 2022-23
Strategic Delivery
Detail
Annual
Estimate
2021/22           
£m
Annual
Estimate
2022/23          
£m
Movement 2021-
22 to 2022-23 Explanation of Movement
EMPLOYEE COSTS
3.643 3.754 0.111
Movement mainly reflects payroll inflation (£0.111m) and a budget
realignment based on 2021-22 outturn and discussion with the service
(£0.123m)  partly offset by the impact of savings proposals as part of the
2022-23 budget setting process (£0.123m).
PREMISES COSTS 0.036 0.036 0.000
TRANSPORT COSTS 0.026 0.022 (0.004) Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
SUPPLIES & SERVICES 0.927 0.836 (0.091) Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
THIRD PARTY PAYMENTS 0.000 0.000 0.000
DEBT CHARGES 0.008 0.015 0.007 Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
TOTAL EXPENDITURE 4.640 4.663 0.023
INCOME (0.794) (0.830) (0.036) Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
NET EXPENDITURE 3.846 3.833 (0.013)
Local Delivery - East
Detail
Annual
Estimate
2021/22           
£m
Annual
Estimate
2022/23          
£m
Movement 2021-
22 to 2022-23 Explanation of Movement
EMPLOYEE COSTS 2.965 3.162 0.197
Movement mainly reflects payroll inflation (£0.202m) and an increase in
Modern Apprentice budgets (£0.062m) partly offset by the impact of
savings proposals as part of the 2022-23 budget setting process
(£0.069m).
PREMISES COSTS 0.324 0.325 0.001 Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
TRANSPORT COSTS 0.635 0.663 0.028
Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service, particularly in relation to the hire
of vehicles and plant.
SUPPLIES & SERVICES 2.182 2.080 (0.102)
Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service, particularly in relation to roads
materials (£0.030m), winter materials (£0.050m) and consultancy
(£0.024m).
THIRD PARTY PAYMENTS 1.424 1.302 (0.122)
Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service, particularly in relation to a
reduction in roads maintenance sub contractor budgets due to an
increase in seasonal staff.
DEBT CHARGES 0.211 0.296 0.085
Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service, particularly in relation to debt
charges in respect of purchased vehicles within Roads Maintenance.
TOTAL EXPENDITURE 7.741 7.828 0.087
INCOME (3.631) (3.586) 0.045 Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service.
NET EXPENDITURE 4.110 4.242 0.132
Local Delivery - South
Detail
Annual
Estimate
2021/22           
£m
Annual
Estimate
2022/23          
£m
Movement 2021-
22 to 2022-23 Explanation of Movement
EMPLOYEE COSTS 2.174 2.217 0.043
Movement mainly reflects payroll inflation (£0.066m) partly offset by a
budget realignment based on 2021-22 outturn and discussion with the
service (£0.023m). 
PREMISES COSTS 0.152 0.168 0.016
Movement mainly reflects a budget realignment based on 2021-22
outturn and discussion with the service, particularly in respect of utility
charges
TRANSPORT COSTS 0.958 0.915 (0.043)
Movement mainly reflects the virement of leasing budgets to debt
charges to reflect current procurement strategy (£0.087m), partly offset
by a budget realignment based on 2021-22 outturn and discussion with
the service (£0.044m), particularly in relation to fuel and vehicle
maintenance costs.
SUPPLIES & SERVICES 1.619 1.758 0.139
Movement reflects additional resources in relation to coal tar (£0.100m),
along with a budget realignment based on 2021-22 outturn and
discussion with the service (£0.039m) particulary in respect of
maintenance materials.
THIRD PARTY PAYMENTS 1.322 1.397 0.075
Movement mainly reflects a budget realignment based on 2021-22
outturn and discu.ssion with the service, particularly in relation to sub
contractors
DEBT CHARGES 0.019 0.106 0.087 Movement mainly reflects the virement of leasing budgets to debt
charges to reflect current procurement strategy (£0.087m)
TOTAL EXPENDITURE 6.244 6.561 0.317
INCOME (2.208) (2.089) 0.119
Movement reflects additional resources to offset the impact of covid on
parking income (£0.269m). This is partly offset by a budget realignment
based on 2021-22 outturn and discussion with the service (£0.150m),
particularly in relation to seasonal street lighting and roads maintenance
income.
NET EXPENDITURE 4.036 4.472 0.436
11.992 12.547
18

Page 19

1
AYRSHIRE SHARED SERVICES JOINT COMMITTEE 2 SEPTEMBER 2022 
INTERNAL AUDIT ANNUAL UPDATE REPORT: 
AYRSHIRE ROADS ALLIANCE 
Report by Chief Auditor 
SUBJECT: INTERNAL AUDIT ANNUAL UPDATE REPORT 
PURPOSE
1. This established annual report is intended to provide, for information, an
update of internal audit work to the ASSJC. The report reflects Internal Audit
outcomes since the inception of ARA and items included in the current year
plan. 
RECOMMENDATIONS 
2. It is recommended that Joint Committee: 
i. notes the outcomes of Internal Audit work to date as summarised at
paragraph 12 and detailed at Appendix 1; 
ii.  notes the ongoing annual opinion of reasonable assurance for EAC as
laid out in paragraphs 13-14; 
iii. notes the ARA item included in the 2022/23 EAC Internal Audit plan as
noted at paragraph 15; and 
iv. otherwise notes the contents of this report. 
BACKGROUND 
FRAMEWORK FOR INTERNAL AUDIT WORK
3. As the lead authority, East Ayrshire Council (EAC) provides the internal audit
service to the Ayrshire Roads Alliance (ARA). South Ayrshire Council (SAC) is
able to carry out Following the Public Pound (FTPP) type audits as desired
and those reports would be a matter for SAC to consider. The Chief Auditors
of both Councils work closely together including through the longstanding Pan-
Ayrshire Chief Auditors Group. 
4. ARA assignments are included in the annual EAC Internal Audit Plan
approved by EAC’s Governance & Scrutiny Committee in line with Public
Sector Internal Audit Standards (PSIAS).
5. The Public Sector Internal Audit Standards (PSIAS) require the Chief Auditor
to establish a follow-up process to monitor and ensure management actions
have been effectively implemented. We follow-up by testing evidence to gauge
implementation of all recommendations. 
Agenda Item 4
19

Page 20

2
6. Individual internal audit assignment reports and follow-up exercises are
shared with both EAC and SAC: 
• EAC - the established readership includes senior management and all
Elected Members through the Councillors’ Noticeboard. 
• SAC – all reports are copied to the Director (Place) and shared with the
SAC Chief Internal Auditor for onward reporting in line with SAC
arrangements. 
7. It was previously established that individual audit assignment reports will not
be brought to the ASSJC as they can be sourced through the established
reporting arrangements within both EAC and SAC. 
8. Internal audit reports are also shared with the external auditor of EAC and
SAC. External audit review the activities of internal audit with no issues raised
for EAC since the inception of ARA. 
9. The external audit report on the audit dimensions and best value for the year
ended 31 March 2022 was considered by the Governance & Scrutiny
Committee on 16 June 2022 and stated that a “robust internal audit function,
as well as appropriate arrangements for the prevention and detection of fraud
and error” were in place at EAC.
10. The Head of Roads continues to accept and welcome Internal Audit
recommendations.
DETAIL 
ASSURANCE LEVELS FOR INDIVIDUAL ASSIGNMENT REPORTS 
11. Assignment reports, with the exception of some advisory work and fact-
finding, conclude with an overall assessment of the controls under review
using the list below as a guide. We also consider the context for each area
under review including risk and materiality. 
sound assurance / sound assurance in most areas – objectives of
internal control have been met in all/almost all areas within the scope of the
audit; non-compliance has only been identified in low risk or medium risk
areas. 
reasonable assurance - objectives of internal control have been met in the
majority of areas; some weaknesses have been identified in medium risk
areas; this tends to be the most common assurance outcome. 
limited assurance – the control objectives have not been fully achieved;
control weaknesses have been identified in some high risk areas.               
no assurance – the control objectives have not been met; significant non-
compliance and/or control weaknesses have been identified.   
INTERNAL AUDIT WORK – AN OVERVIEW   
12. Appendix 1 lists internal audit work since 2013/14 at which point the EAC
Chief Auditor was a member of the working group to establish ARA. Internal
20

Page 21

3
audit work has since been carried out every year since inception on 1 April
2014 with 15 assignments carried out and 10 follow-up exercises to test
implementation of internal audit recommendations. The 15 assignments have
generally resulted in good assurance outcomes with most assignments
resulting in either reasonable, sound in most areas or sound assurance.
Follow-up exercises since 2018/19 have resulted in scores of 100% (i.e. all
recommendations either fully or sufficiently implemented). 
ANNUAL INTERNAL AUDIT OPINION: EAC 2021/22
13. ARA operates within the control systems of EAC, therefore the Chief Auditor’s
annual opinion for EAC is of interest to the ASSJC. The most that Internal
Audit can provide in an annual opinion for the Council is reasonable assurance
based on the risk based plan and a rolling programme of work. This is similar
to the scope of external audit work in the context of the Council’s financial
statements which aims to give reasonable assurance on the statements. The
Internal Audit annual opinion for 2021/22 continues to be one of reasonable
assurance and was considered by the Governance & Scrutiny Committee on
21 April 2022.
14. The full EAC annual internal audit report can be found at the following link: 
Internal Audit 2021-22 Annual Report - internal audit 2021-22 annual
report.pdf (east-ayrshire.gov.uk)
PLANNED AUDIT ASSIGNMENTS FOR ARA – 2022/23 
15. In line with PSIAS obligations a full risk based plan was agreed by the EAC
Governance & Scrutiny Committee on 16 June 2022. This was later than usual
due to the local government elections in May 2022. A summary plan had been
agreed earlier in April 2022. The SAC Chief Internal Auditor was consulted
during the planning process. It should be noted, that in line with good practice
the plan can be changed in year to accommodate emerging priorities and
contingencies are held (e.g. for small advisory / fact-finding) which ARA can
make use of. The planned ARA work is as follows: 
• Payment Controls including measurement of works – Contract Audit / Anti-
Fraud – 23 days allocated 
16. The full EAC current annual plan can be found at the following link:
Internal Audit Plan 2022-23 - Detailed - internal audit plan 2022-23 -
detailed.pdf (east-ayrshire.gov.uk) 
POLICY/COMMUNITY PLAN IMPLICATIONS 
17. No issues arising from this report. 
LEGAL IMPLICATIONS 
18. No issues arising from this report. 
21

Page 22

4          
HUMAN RESOURCE IMPLICATIONS 
19. No issues arising from this report. 
EQUALITY IMPACT IMPLICATIONS 
20. There are no equality impact implications as: 
• the recommended actions do not affect people, and 
• the report is also to inform the Committee on performance. 
FINANCIAL IMPLICATIONS 
21. No issues arising from this report.
RISK IMPLICATIONS 
22. Each year there is the ongoing risk of significant unplanned work emerging,
planned resources not being available and work not being carried out to an
acceptable standard which would compromise the ability to complete sufficient
work. The Audit Manager and Chief Auditor oversee operations with the
objective of targeting resources for the best outcomes. 
TRANSFORMATION STRATEGY 
23. Good practice indicates that in order to innovate an organisation requires
strong foundations which internal audit recommendations are designed to
support. 
NET ZERO IMPLICATIONS 
24. No issues arising from this report.
BACKGROUND PAPERS  
1. Public Sector Internal Audit Standards (PSIAS) (3rd edition March 2017) 
2. Chartered Institute of Public Finance and Accountancy (CIPFA) Local
Government Application Note for the United Kingdom Public Sector Internal
Audit Standards (2nd edition February 2019) 
3. Chartered Institute of Public Finance & Accountancy (CIPFA), Statement on
the Role of the Head of Internal Audit in Public Service Organisations (2nd
edition April 2019) 
4. EAC Governance & Scrutiny Committee, 21 April 2022, Internal Audit Annual
Report 2021/22 
5. EAC Governance & Scrutiny Committee, 16 June 2022, External Audit Report
on the Audit Dimensions and Best Value for the Year Ended 31 March 2022 
22

Page 23

5
6. EAC Governance & Scrutiny Committee, 16 June 2022, Internal Audit Plan
2022/23 (Detail) 
APPENDICES 
Appendix 1: Internal Audit Assignments: 2013/14 to 2021/22 
Eilidh Mackay 
Chief Auditor, East Ayrshire Council 
16 August 2022 
Person to Contact: Eilidh Mackay, Chief Auditor, eilidh.mackay@east-ayrshire.gov.uk 
Implementation Officers: Eilidh Mackay, Chief Auditor / Paul Davies, Audit Manager 
paul.davies@east-ayrshire.gov.uk 
23

Page 24

6
Appendix 1
Internal Audit Assignments: 2013/14 to 2021/22 
Year  Assignment / 
Follow-Up Exercise 
Summary Assurance Level / 
Follow-Up % 
Score  
2013/14  Support to working 
group to establish ARA 
Advisory to support governance, risk management and internal 
control arrangements. 
Advisory  
1 April 2014 – ARA goes live
2014/15  Plant Hire Contract 
(coverage included ARA 
and other services)
Objectives were to: 
• ensure that hires are awarded to the correct service
provider in accordance with the framework agreement;
• ensure that processes for managing plant on and off hire
are rigidly controlled and properly recorded; and
• ensure that the correct contractual prices are paid for
plant hires provided in accordance with the framework
terms & conditions.
Reasonable 
2014/15  ARA Inventory 
Inspections 
(unannounced visits) 
Objectives of the assignment were to:
• verify the accuracy of inventory levels recorded within the
store
• report any areas for improvement identified, and
• recommend actions to address areas for improvement.
Reasonable 
2014/15  ARA Profess Costing 
System
The objectives of the assignment were to:
• Consider the overall costing and financial reporting
arrangements put in place for the Ayrshire Roads Alliance
• Assess the status of implementation and roll-out of the
PROFESS costing system, including the integration of
inputs from the former East and South Ayrshire roads
services
• Consider whether the information needs of management
Reasonable 
24

Page 25

7
and stakeholders are being met by the current
arrangements
• Report any areas for improvement identified, and
recommend actions to address areas for improvement 
2015/16  TRIPS System Advisory Advisory to support governance, risk and internal control arrangement 
regarding the development of the established Transparent Roads 
Infrastructure Procurement Software (TRIPS) system used to manage 
the Roads Minor Works Framework Contract to support best value. 
Advisory 
2016/17  Parking Income & 
Penalty Charge Notices 
(PCNs)
The objective of the assignment was to:
• review the systems for Parking-related income
• report any areas for improvement identified, and 
• recommend actions for improvement. 
Reasonable 
2016/17  ARA Profess Costing 
System – Follow-up
To test implementation of the ten recommendations made in 2014/15.  Score 67%. Six 
recommendations 
tested – four fully 
or sufficiently 
implemented and 
two not 
implemented. The 
four other 
recommendations 
were on hold 
pending completion 
of the definitive 
build of PROFESS 
RCM. 
2016/17  Plant Hire – Follow-up To test implementation of four recommendations made in 2014/15. Score 75%. Three 
25

Page 26

8
recommendations 
fully implemented 
and one partially 
implemented. 
2016/17  ARA Inventory 
Inspections – Follow-up
To test implementation of the five recommendations made in 2014/15. Score 60%. Three 
recommendations  
fully or sufficiently 
implemented; one 
partially and one  
not implemented.
2017/18 Performance Bonds  The objectives of this audit assignment were to verify:
• Policy and procedures accord with Scottish Government
strategy and national guidance on best practice;
• Corporate governance and reporting arrangements are fit for
purpose and effectively applied;
• Practical processes and supervisory controls are in place in
ARA for implementing approved policy;
• ARA’ s bond management is supported by effective
partnership arrangements with third parties (e.g., with South
Ayrshire Council; and with EAC’s Planning & Economic
Development, Finance & ICT and Legal);
• Bond values reflect application of the above and give
sufficient budget to fund any necessary remedial work.
Limited 
2017/18 Use of Contractors  The objectives of this audit assignment were to:
• Establish the process for awarding roads works contracts.
procured through the Transparent Roads Infrastructure
Reasonable 
26

Page 27

9
Procurement Software (TRIPS) 
• Ensure roads works are being awarded appropriately in line with
Standing Orders Relating to Contracts and assess whether Best
Value is being achieved.
• Ensure adequate controls are in place with regards to processes
for awarding works, payment of invoices and monitoring of
contractor performance.
2017/18 Parking Income & PCNs 
– Follow-up
To test implementation of the 13 recommendations made in 2016/17. Score 92%. Twelve 
recommendations  
fully or sufficiently 
implemented and 
one partially 
implemented. 
2018/19  Girvan Harbour – office 
administration 
(unannounced visit)
The objectives of this audit assignment were to: 
• understand the operation of Girvan Harbour and ensure that
there are adequate arrangements in place to control income
collected in respect of harbour operations
• to identify areas for potential future audits.  
Limited 
2018/19 ARA Payment Controls  The aims and objectives of this audit assignment were to: 
• review the procedures in place for payment of contractors 
• verify that there are adequate controls in place to verify the
work completed prior to approving invoices for payment.  
Sound 
2018/19 Bridge Inspections  The former EAC Depute Chief Executive (Safer Communities) with 
assistance from Internal Audit reviewed ARA-East’s arrangements for 
bridge inspection and reporting.  Following this work, in 2019/20 
Internal Audit undertook a full examination of ARA bridge inspection 
and reporting in both East and South Ayrshire. 
Advisory 
27

Page 28

10
2018/19 Performance Bonds – 
Follow-up
To test implementation of the two recommendations made in 2017/18. Score 100%. Both 
recommendations 
sufficiently 
implemented. 
2018/19 Use of Contractors – 
Follow-up
To test implementation of the two recommendations made in 2017/18. Score 100%. Both 
recommendations 
fully implemented.
2019/20  ARA Bridges – Follow-
up 
To test implementation of the five recommendations made in 2018/19. Score 100%. All 
recommendations 
either fully or 
sufficiently 
implemented.
2019/20 ARA Girvan Harbour -
Follow-up 
To test implementation of the five recommendations made in 2018/19. Score 100%. All 
recommendations 
either fully or 
sufficiently 
implemented.
2019/20 Ayrshire Roads Alliance: 
Road Bonds review of 
new processes 
The objectives of this audit assignment were to:
• verify procedures in relation to roads bonds are adequate,
have been updated to reflect the findings of previous audit
work and have been fully implemented within the service, and
• the audit will also seek to confirm that ARA’s internal review
of the process, and scrutiny by external assessor (SGS Ltd),
have verified control effectiveness; and that if necessary,
procedures have been further revised to improve controls.
Sound in most 
areas 
2019/20  Ayrshire Roads Alliance: 
Bridge Inspections The objectives of this audit assignment were to:
• Update the findings of 2018/19 work to reflect the undertaking
and completion of the outsourced Principal Inspection
programme and work done by ARA further to the Client
Sound – South 
Reasonable – East 
28

Page 29

11
Response agreed actions set out in the draft audit report and
accompanying advisory note of 2018/19. 
2020/21 ARA Roads 
Maintenance: materials 
& stores 
The objectives of this audit assignment were to:
• Obtain assurance that the service has adequate
arrangements in place to ensure proper control over the
receiving, storing and issuing of materials and stores, and that
these processes are operating efficiently and effectively.
Reasonable 
2021/22  ARA Roads 
Maintenance: materials 
& stores - Follow-up 
To test implementation of the five recommendations made in 2020/21. Score 100%. All 
recommendations 
fully implemented.
2021/22 Ayrshire Roads Alliance: 
Road Bonds review of 
new processes – 
Follow-Up 
To test implementation of the six recommendations made in 2019/20. Score 100%. All 
recommendations 
either fully or 
sufficiently 
implemented.
2021/22 Whistleblowing 
allegations – fact-finding 
Final report issued in 2021/22 to both Councils.  N/A 
END 
29

Page 30

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
2 SEPTEMBER 2022 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: ROADWORKS PROGRAMME 2022/23
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this report is to advise the Joint Committee on the progress of
work through the roads improvement programmes within East Ayrshire and
South Ayrshire for financial year 2022-2023. 
RECOMMENDATIONS 
2. It is recommended that Joint Committee: 
(i) Notes the Ayrshire Roads Alliance works completed 2022/23,
(ii) Otherwise, notes the contents of this Report. 
BACKGROUND 
3. The budget allocation for East and South Ayrshire Councils Roads Investment
Programme for FY 2022/23 can be seen in tables 1 and 2 below respectively. 
Programme Area Budget (£m)
Carriageway Resurfacing 5.125
Footway Resurfacing 0.250
Street Lighting 0.230
Traffic & Road Safety 0.315
Structures (Bridges & Culverts) 3.000
Cycling, Walking & Safer Routes 0.778
Smarter Choices, Smarter Places 0.172
Sustrans 0.100
SPT  2.270
SFT 0.060
Car Parks 1.583
School Streets 0.100
EV Charging 0.100
Other Works 0.080
Total 14.163 
Table 1: East Ayrshire Council Roads Investment Programme 2022/23 
Agenda Item 5
30

Page 31

Programme Area Budget (£m)
Carriageway & Footway Resurfacing 3.500
Structures (Bridges & Culverts) 0.840
Street Lighting 0.205
20mph Rural Villages 0.023
Traffic Signals 0.390
LED Replacement 0.232
Girvan Harbour 0.318
Slope Stabilisation 0.190
EV charging  0.100
Cycling, Walking & Safer Routes 0.718
Smarter Choices, Smarter Places 0.158
Sustrans 0.262
SFT 0.060
SPT 0.500
STTS 0.148
Total 7.664 
Table 2: South Ayrshire Council Roads Investment Programme 2022/23 
DETAIL 
4. The programmes for FY 22/23 are contained within Appendices One and Two. 
Resurfacing 
5. The roads improvement programmes for FY 22/23 commenced in April with
some early improvement works completed. Significant work is ongoing at this
time to design and programme this year’s works in tandem with managing our
teams and contractors in completing this work. 
7. As per previous years bids have been made for timber transport funding as part
of this year’s road improvement programme with a confirmed award for South
Ayrshire of £0.148m for two projects. No awards were made to East Ayrshire
despite bids for 3 projects. 
Street Lighting
8. In addition to the lighting improvement and LED replacement programmes
additional full lighting replacement works have been agreed in Prestwick and
Girvan to replace some older installations and align with the appropriate BS5489
/EN 13201 lighting categories. 
9. Long delay in procuring lighting columns - earliest delivery for 8m cols expected
September. Contractors are also experiencing this issue. Post covid lockdown
issue 
Electric Vehicle Infrastructure 
31

Page 32

10. The electric vehicle charging infrastructure programme has been included within
Appendix One and Two for South and East Ayrshire respectively, with the
number of public chargers installed to date is included at Appendix 3. Work has
been ongoing with SFT and Transport Scotland to explore public/private
partnerships for public charging network.£120k has been awarded to ARA to
develop a private public strategy with a draft to be submitted to SFT/TS by
September 2022 on approval from both authorities. 
11. EV @ New Cumnock Swimming Pool Commissioned 16 Aug 2022
Faulty New Cumnock charger – agreed that pillar will be replaced (funding
identified). Date to be confirmed. 
Structures 
12. Many of the bridge projects that we undertake require works to be undertaken
within the watercourse and depending on what the works involve we often require
a licence to be obtained. SEPA has 4 months to determine a licence application
and they usually take this time. Other constraints, such as fish spawning season
can also restrict when you can work in the watercourse. There are a number of
projects where a CAR application is ready for submission but the inability to
submit it to SEPA is likely to mean the project will incur delay. Where possible
other projects that do not require a CAR Licence will be brought forward. 
13. Land acquisition and/or access agreements are often required for bridge related
projects and can cause delay to the projects. A number of projects are currently
near tender ready but are being delayed due to land related issues. ARA are
actively working with the Council’s Estates and Legal teams in all of these
projects but land acquisition can be a very challenging and resource intense
activity. Again, where possible, projects that do not require land acquisition or
formal legal access agreements will be brought forward. 
14. ARA hold a seat on the Coastal Adaptation Budget Group. Form and guidance
for Coastal Councils to apply for a share of the £550,000 for 2022/23 was
significantly progressed at the most recent budget group meeting. 
Traffic & Transportation 
15. Agreement has been reached where necessary to roll grant funding provision
into the new financial year to complete projects. The focus of these projects will
continue to be improvements to our roads and infrastructure to improve journeys
and increase safety measures where required. The Active Travel Strategy for
East Ayrshire is complete and was presented to Cabinet on 15th June 2022
stakeholder re-engagement commenced – completion 30 Sept – to allow for
school holidays .This followed a similar approach to the Active Travel Strategy
development for South Ayrshire approved by South Ayrshire Council 8th  March
2022. 
32

Page 33

16. Road Safety Improvement Fund Cross boundary bid for £400,000 in total, with
proposals including the installation of school gateway features at 10 schools (5
x EAC, 5 x SAC) along with installation of antiskid surfacing at problem locations 
17. ARA have submitted a change control bid for an additional £30k to SCSP to cover
costs of Hub website development – this has now been approved. 
18. 36K awarded for 20mph assessment. 
19. Hurlford Road, Riccarton  scheme progressing – order in force 2 Sept 2022 
POLICY/COMMUNITY PLANNING ISSUES 
20.  A well -maintained road network will contribute to achieving the Community 
Plan objectives in relation to Economy & Skills and Safer Communities to
maintain good access to our communities within East Ayrshire. 
21.  The matters referred to in this report contribute to the South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome of ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’ 
LEGAL IMPLICATIONS 
22.  By virtue of the relevant statutory provisions, principally detailed within the Roads
(Scotland) Act 1984, the Council as local roads authority is required to manage
and maintain all publicly adopted roads within its area other than those which are
maintained and managed by the Scottish Ministers. 
HUMAN RESOURCES IMPLICATIONS 
23.  The work programmes have direct impact on human resources and the Alliance
will ensure all works are suitably resourced to maintain  satisfactory progress. 
EQUALITY IMPACT IMPLICATIONS 
24.  An equality impact assessment is not needed because the proposal does not
have a differential impact on any of the protected characteristics. 
FINANCIAL IMPLICATIONS 
25. The Ayrshire Roads Alliance will deliver the strategic and local services as stated
in the Service Plan. The budget is provided by East Ayrshire Council, South
Ayrshire Council, and other external organisations. Appropriate scrutiny
arrangements are in place to manage these budgets.
33

Page 34

RISK IMPLICATIONS 
26.  The Ayrshire Roads Alliance Risk Register is reviewed and presented to very 
Joint Committee. 
27.  The Works Programmes, Service Plan and the Risk Register do not expose
either Council to an increased risk as they have been developed from existing
budgets and existing service commitment. 
TRANSFORMATION STRATEGY 
28.  This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
Maximum value for our communities; by ensuring the road network is maintained. 
BACKGROUND PAPERS 
East Ayrshire Council Cabinet Report – 2022/23 Roads Asset Management
Plan – Investment and Programme - 16 March 2022 
South Ayrshire Council Leadership Report Road Improvement Plan 2022/23 -
08 March 2022   
LIST OF APPENDICES 
Appendix 1 - South Ayrshire Council Programme of Works 2022/23 
Appendix 2 - East Ayrshire Council Programme of Works 2022/23 
Appendix 3 – EV Infrastructure 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation Officer:Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
34

Page 35

35

Page 36

Appendix 1 - South Ayrshire Council- Ayrshire Roads Alliance
Carriageway Structural Maintenance Capital Programme over two years 2022/24 
Works Carried Over From 2021 
Route
No
Town Road Name Works
Description
Scheme
Score
Estimated
Cost
Comments Variance
+/-
Uncl Ayr Sannox View Full Length N/A £76,230 Complete Final
Measure
Uncl Ayr Viewfield Road Full length N/A £58,905 Complete Final
Measure
Uncl Ayr Hunters Avenue T Lights to
Northfield
N/A £129,150 Complete  Final
Measure
Uncl Prestwick Kyle Street  Full length N/A £54,180 Complete Final
Measure
Uncl Ayr Dalmilling Drive   Full length N/A £71,904 Complete Final
Measure
Uncl Ayr Taylor Street Full Length N/A £109,141 Complete Final
Measure
Uncl Ayr Carrick Avenue Full Length N/A £100,947 Complete Final
Measure
Uncl Ayr St Phillans Avenue Full Length N/A £222,755 Complete Final
Measure
Uncl Ayr Southpark Road Full Length +
fway works?
N/A £125,364 Complete Final
Measure
A719 By Maybole Maidens Ayr North of
Humeston
N/A £98,572 Complete Final
Measure
B734 Old Dailly Barr Old Dailly Old Dailly to
Penkill +
N/A £108,000 Complete Final
Measure
36

Page 37

drainage
improvements
B7035 By Girvan Glendoune Houdston
Road (Coalpots)
Braetoll South
+ S Power
shut down
N/A £100,500 Complete Final
Measure
Uncl Dailly Back Road Full Length N/A £107,646 Complete Final
Measure
Uncl Girvan Carrick Street Full Length N/A £44,499 Complete Final
Measure
Uncl Ayr Kersepark Footway Full length
one side
N/A £41,250 Complete Final
Measure
Uncl Ayr Arthur Street Footway Full N/A £26,186 programmed Final
Measure
B7023 Crosshill King Street
Footway
Shop side full
length
N/A £27,364 programmed 
C31 Crosshill Kirkmichael Road
Footway
By
Community
Centre
N/A £8,250 programmed 
Uncl Girvan Hawthorn Drive
Footway 
N/A £57,112 programmed 
Surface Dressing Works –Proposed 2023/24 
U72 By
Dundonald
Crooks Full Length N/A   
U99 By
Symington
Dundonald Symington C32 to U98
Corraith
N/A   
C115 By Tarbolton Parkmill Road Parkmill to
C114
N/A   
C114 By Tarbolton Largie Road 2 sections N/A   
B744 By Tarbolton Tarbolton/Crosshands C114 to
Auchinweet
N/A   
37

Page 38

C74 By Ayr Macnairston Road Macnairston
to Lochfergus
N/A   
C122 By Minishant School Road Full Length N/A   
C60 By Maybole Ladycross Full Length N/A   
C39 By Ayr Corton Road A77 to
Equestrian
Centre
N/A   
C29 By Maybole North Water of Girvan
- Maybole Road
30 mph
Maybole
south to U3
N/A   
U2 By Maybole Auchencross C29 to
Railway
Bridge
N/A   
U25 By Dailly Delamford B741 to
Hadyard Hill
N/A   
U56 Girvan Golf Course Road Newton
Kennedy Br.
to
Knockvalley
Cottages
N/A   
C102 By
Kirkoswald
Balvaird  Full Length N/A   
Carriageway Resurfacing Works 2022/24 
A719 By Tarbolton Failtoll Crossroads By Lilylaw
Farm
N/A £173,875 Complete Final
Measure
A759 Dundonald Bypass Road,
Dundonald
Auchans to
Palmer Mount
61 £219,000 Complete Final
Measure
B730 By
Symington
B730
Tarbolton/Dundonald
Dankeith to
B751
Junction
53 £158,763 Complete Final
Measure
38

Page 39

B730 By
Dundonald
B730 Bogend/A77(T)
- Tarbolton
Road/Dundonald,
Dundonald
Slough Bridge
to Tarbolton
Road
Dundonald
53 £265,500 Complete Final
Measure
C92(C8) By Craigie Plewlands Road Full Length
incl part C8 to
A719
47 £139,040 programmed 
Uncl Troon Queens Drive Full Length 42 £35,640 programmed 
B744 By Tarbolton B744 Garden
Street/Tarbolton -
Council Boundary,
Tarbolton
From
Barrmuirhill
east to
Auchinweet
69 £159,000 Complete Final
Measure
B743 By
Mossblown
Ayr / Mossblown? West from
Brocklehill
Farm
53 £271,250 programmed 
C115 By Tarbolton C115 Montgomerie
Street/Tarbolton -
C114 Jcn Sw Of
Barhill, Mauchline
From Fail
Bridge
westwards
50 £123,200 programmed 
C37 Auchincruive Barrackhall Gibbsyard TBC 48 £134,400 programmed 
Uncl Ayr Saltpans Road North from
Glebe Road
46 £48,750 programmed 
Uncl Tarbolton Springfield Road Garden Street
to No 50
46 £35,200 programmed 
Uncl Prestwick Morris Road Full Road 43 £34,320 programmed 
Uncl Ayr Green Street Waggon
Road to
Crown Street
42 £67,760 programmed 
Uncl Prestwick Craigie Street Full length 39 £11,638 programmed 
C74 By Ayr Macnairston Road C105 to B742
Junction
52 £92,960 programmed 
39

Page 40

B744 By Annbank B744 Jcn At B742 N
Of Annbank - B743,
Annbank
from B743
junction
south-
westwards
63 £120,000 Complete Final
Measure
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
By Holebogs,
S bend
59 £45,000 programmed 
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
From A70 at
Hillhead
south to C21
Craigs Road
junction
56 £57,000 programmed 
B744 Annbank Weston Avenue Craighall Way
to 101
Weston
Avenue
56 £70,875 programmed 
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
From
Meadowhead
Depot
entrance
south-wards
55 £97,500 programmed 
B744 Annbank Weston Brae Full Length 53 £58,125 programmed 
B744 Annbank Browns Crescent Full Length 53 £28,125 programmed 
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
Bridge of
Coyle to C2
52 £190,500 programmed 
B744 By Annbank B744 Belston/A70 -
Weston
Avenue/Annbank, Ayr
Auchincruive
Junction to
Glenview
52 £91,250 programmed 
U77 By Coylton Hole Road Full Length 46 £43,360 programmed 
Uncl Ayr Ellisland Square Full Length 42 £58,806 programmed 
Uncl Ayr Chapel Park Road Full Length 40 £53,319 programmed 
40

Page 41

B742 By Maybole B742 Jcn Of A77(T)
Ne Of Maybole -
Council Boundary S
Of Dalrymple,
Maybole
From B7045
junction
westwards
N/A £66,845 programmed 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
By Humeston,
Castlehill
woods to
Pennyglen
70 £93,800 programmed 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
Cemetery to
Drumshang
67 £182,000 programmed 
A719 By Maidens A719
Pennyglen/B7023 -
Kirkoswald
Road/Maidens,
Maidens
Morriston
Farm to Jct
Blawearie
56 £186,000 programmed 
A719 By Maidens A719 Turnberry
Road/Maidens -
Maidens
Road/Maidens,
Turnberry
Maidens to
Turnberry
56 £232,500 programmed 
B7023 Maybole Crosshill Road Full Length 56 £56,250 programmed 
B7023 Maybole St Cuthbert's Road Full Length 53 £28,125 programmed 
B7024 Maybole Alloway Road Redbrae to
Bypass
51 £71,250 programmed 
C122 By Maybole C122 Gardenrose
Path/Maybole -
School
Road/Minishant,
Maybole
School to new
Bypass
50 £18,150 programmed 
41

Page 42

C122 By Maybole C122 Gardenrose
Path/Maybole -
School
Road/Minishant,
Maybole
Ladycross to
new Bypass
50 £24,192 programmed 
B7023 Maybole Crosshill Road Full Length 56 £56,250 programmed 
B7023 Maybole Maybole Crosshill 30mph
Maybole to
jcn C58
72 £323,840 programmed 
A714 Barrhill Main Street  Full Length 61 £148,800 programmed 
B7027 Barrhill Knowe road Jcn A714 to
Dusk mill
area.
58 £53,808 programmed 
B741 Dailly Girvan/Dailly Bargany  55 £105,840 programmed 
C29 Maybole North Water of
Girvan/Maybole Road
Wallacetown
to Ruglen
various
locations
55 £136,125 programmed 
U52 Pinwherry Muck road Various TBC 52 £76,800 programmed 
C45 Ballantrae Heronsford Road A77- Laggan 48 £56,840 programmed 
U6 By
Ballantrae
Balkissock Full length 44 £101,482 programmed 
Footway Resurfacing Works 2022/24 
Uncl Troon Fullarton Drive  No 19 to No
37
30 £16,500 programmed 
B730 Dundonald Drybridge Road Bowling
Green to
Kilnford Dr
28 £14,500 programmed 
42

Page 43

B730 Dundonald Drybridge Road Kilnford Drive
to A759
28 £33,600 programmed 
C492 Troon Bentinck Drive No 97 to No
121
28 £20,000 programmed 
Uncl Prestwick Outdale Avenue F/path
Sherwood
Road side ,
both sides
30 £38,300 programmed 
C17 Tarbolton Westport Footway
North side
28 £17,370 programmed 
B743 Mossblown Mauchline Road Fourways to
Railway
Bridge North
side
28 £15,300 programmed 
Uncl Ayr Content Avenue South Side
full length
(College
Side)
28 £8,400 programmed 
Uncl Mossblown Martin Avenue  28 £15,300 programmed 
Uncl Prestwick Hunters Avenue South from
Heathfield
Road, west
side
23 £7,500 programmed 
Uncl Ayr Bellevue Crescent  34 £37,800 programmed 
Uncl Ayr Hawthorn Drive  30 £62,000 programmed 
B742 Annbank Weston Brae  28 £10,700 programmed 
Uncl Maidens Ardlochan Road  30 £20,000 programmed 
Uncl Maybole Hicks Avenue No 2 to No 94 30 £28,980 programmed 
Uncl Maybole Queens Terrace No 17 to No
39 + cway
28 £18,000 programmed 
43

Page 44

see separate
entry
Uncl Maybole Kingcraig Avenue No 2 to No 32
+ cway see
separate
entry
28 £22,800 programmed 
Uncl Ayr Lochpark slab
replacement
23 £20,425 programmed 
C151 Dailly Woodside Both sides
from Back St
and Hadyard
Terr
30 £20,400 programmed 
Uncl Dailly Church Crescent Odd number
side full
length
30 £16,000 programmed 
Uncl Crosshill Newton Street Church Side
of road
30 £15,795 programmed 
Uncl Dailly Hadyard Terrace Inside
footway +
part outer
section
28 £54,400 programmed 
TOTAL  £6,928,827 
South Ayrshire Council- Ayrshire Roads Alliance
Lighting Programme 2022/23 
Town Location Work Type No of
columns
Estimated
Programme
Cost
Comments Variance
+/-
44

Page 45

Ayr James Street and Area Carry forward from
2021/22 30 £62k On Site 
Ayr
Auchendoon Crescent
and various Service
Roads
No existing lighting 7 £17k
programmed 
Ayr Dalmilling Road (Phase
2) 5th Core supplies 9 £15k programmed 
Ayr Sannox Road & Place
(Phase 2) 5th Core supplies 8 £20k programmed 
Maybole Greenside (Phase 2) Concrete columns 9 £20k programmed 
Prestwick Mossbank
Old steel columns and
5th Core supplies
(ongoing section
faults)
24 £50k
On site 
Troon
Barassiebank Lane
(part), 
Muir Dr and Wallace Dr
Concrete columns 14 £30k
Complete  Final
Measure    
£214k   
South Ayrshire Council- Ayrshire Roads Alliance
LED Lighting Programme 2022/23 
Town Description Remaining
Ayr - 192 
45

Page 46

South Ayrshire Council- Ayrshire Roads Alliance
Traffic and Transportation Programme 2022/23 
Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/- 
SPT £39,000 Match 
£500,000
Access for All
Review Coylton  
£400,000 Match Alloway to Burton
Construction
Tender
Evaluation 
£11,000
Match Dundonald to
Barrasie Link Ph1
Construction
Design 
£50,000 No
Match
SQP Various
Projects
Design 
Sustrans –
Places for
Everyone 
£120,000 Match 
£262,543
Access for All
Review Coylton
Uncertainty
Over Sustrans
Bid 22/23 
£100,000 Match Alloway to Burton
Construction
Uncertainty
Over Sustrans
Bid 22/23 
£42,543 Match Dundonald to
Barrasie Link Ph1
Construction
Uncertainty
Over Sustrans
Bid 22/23 
£0.00 No
Match  £0.00
Loans to Troon
Railway Station
New Bid
depending on
outcome of
consultation/
public event 
Sustrans –
Cycle
£10,000 Direct
Match 
£10,000
School Cycle
Shelters  
46

Page 47

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
Shelter
Fund
SCSP £158,150 Hub
Match 
£158,150
Active Travel Hub
Ayr
Website Design 
SAC in Kind £0.00 - Active Travel Hub
Ayr  
CWSR £41,000 Match 
£491,000
Access for All
Review Coylton  
£250,000 Match Alloway to Burton
Construction
Tender
evaluation 
£40,000 Match Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
£50,000 Match Dundonald to
Barrasie Link Ph1
Construction
Scheme Design 
£10,000 Direct
Match
School Cycle
Shelters  
CWSR £20,000 Hub
Match 
HUB Match
Station Rd
Dunure  
£20,000 Hub
Match
Hub Match -TBC  
£20,000 Hub
Match
Hub Match -TBC  
£20,000 Hub
Match
Hub Match -TBC  
47

Page 48

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
£20,000 Hub
Match
£100,000 Hub Match -TBC        
Developer
Contribution  £130,000 Match 
£130,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
Total £1,551,693   
ARA New
Signals £230,000 Match 
£200,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
Total £1,751,693   
South Ayrshire Council-Ayrshire Roads Alliance 
Traffic and Transportation Signal Replacement 2022/23 
Signal
No Town  Description  Work
Type
Estimated Programmed
Cost 
Comments Variance
+/-
SAS 15 Ayr
Castlehill
Rd/Chalmers
Rd
Junction
Replacement £60,000
Design 
SA59 Ayr
Whitletts
Road/Craigie
Rd
Junction
Replacement £50,000
Design 
48

Page 49

SA17 Ayr
Whitletts
Rd/Mainholm
Rd
Junction
Replacement £45,000
Design 
SAP1 Ayr Holmston Rd
Pedestrian
Crossing
Replacement
£35,000
Design 
Total    £190,000   
South Ayrshire Council - Ayrshire Roads Alliance
Structures Capital Programme 2022/23 
Description   Work Type Estimated
Programme Cost 
Comments Variance
+/-
A79-30 Victoria Bridge Joint Replacement and
waterproofing
£300,000 On Site 
A79-30 Victoria Bridge Concrete Repairs and Painting £490,571 On site 
£790,571   
49

Page 50

50

Page 51

Appendix 2 East Ayrshire Carriageway Structural Maintenance Programme 2022/23 
ROAD LOCATION Estimated Cost Comment
A713 South of Hollybush £168,750.00 On Site
A713 Polnessan to Patna £150,000.00 Complete
A71 Main Street Darvel £121,875.00 Programmed
A70 Lugar Water Bridge to East Gateway £131,250.00 Complete 
A70 Carbello £103,125.00 Complete 
A719 Moscow £131,250.00 Complete
A719 Rural Sections £131,250.00 Complete
A735 U26 to past C7 Junction £159,375.00 Programmed
B743 Strathaven Road Muirkirk 950m to South Lanarkshire Boundary £98,800.00 Programmed
B7036 Barony Road Near Egger factory Entrance £93,750.00 Programmed
C134 Rural Sections £51,200.00 Programmed
C50 Ochiltree Various sections £89,600.00 On Site
C6 Stewarton Various sections £89,600.00 Programmed
C22 Coal Road From U730 to A70 £264,000.00 Programmed
C23 Rigg Road from U730 to Railway Bridge £88,000.00 Programmed
U730 Glenshamrock Road from B705 to C23 £240,000.00 Programmed
U1 GalstonMoor Road U56 to A71 £160,000.00 Programmed
U760 Dalcairnie Full Length £116,480.00 Programmed
U26 Dunlop Full Length £48,000.00 Programmed
U729 Glenmuir Road Logan Avenue to Loganhill Road £20,000.00 Programmed
Ellis Street Kilmarnock Full Length £16,800.00 Programmed
Howard Street Kilmarnock Full Length £71,400.00 Programmed
Seaford Street Kilmarnock Full Length £112,200.00 Programmed
Dundonald Road Kilmarnock Smillie Place to Seaford Street £123,200.00 Programmed
Witchknowe Road Kilmarnock New Street to Witchknowe Avenue £9,350.00 Programmed
Meiklewood Road Kilmarnock No1 to No 31 £28,050.00 Programmed
Shortlees Crescent Kilmarnock Rathlin Avenue to Shortlees Road £37,400.00 Programmed
Old Street Kilmarnock Academy Street to Campbell St £32,130.00 Programmed
Kinlock Road Kilmarnock Full Length £36,371.50 Programmed
Stoneyhill Avenue Kilmarnock Full Length £18,700.00 Programmed
51

Page 52

Turner Place Kilmarnock Full Length £27,200.00 Programmed
Craufurdland Road Kilmarnock No87 to No145 £20,400.00 Programmed
Old Mill Road kilmarnock Lawson Street to Saturrock Street £52,800.00 Programmed
Grassyards Road Kilmarnock Kennedy Drive to C10 £52,800.00 Programmed
Mansfield Road New Cumnock A76 to Top Corner/ Junction £255,200.00 Programmed
Loch View New Cumnock Full Length £32,725.00 Programmed
Mill of Shield Drongan B730 to Drumwhill Road £56,100.00 Complete
Glencraig Street Drongan Lane Crescent to Hannaston Avenue £37,400.00 Complete
Blaney Avenue Patna Full Length £28,050.00 Programmed
Wallace Street Galston B7037 to Cross £11,900.00 Programmed
Titchfield Street Galston Standalane to Orchrd Street £28,560.00 Complete
Maxwood Road Galston Various Sections £34,000.00 Programmed
Cessnock Road Hurlford Full Length £24,310.00 Complete
Craigie Road Hurlford Full Length £59,840.00 Complete
Blair Avenue Hurlford Full Length £88,825.00 Complete
Crougar Road Crookedholm Full Length £58,905.00 Programmed
Meadowside Crookedholm Full Length £6,375.00 Programmed
High Street Newmilns Full Length £38,250.00 Programmed
East Donnington Street Darvel Full Length £30,600.00 Programmed
Burn Road Darvel Various Sections £74,800.00 Programmed
Campbell Street Darvel Full Length £28,050.00 Programmed
Patterson Terrace Darvel Full Length £21,505.00 Programmed
Fleming Drive Stewarton Full Length £11,874.50 Programmed
Lothian Road Stewarton Full Length £46,750.00 Programmed
Victoria Way Stewarton Full Length £13,090.00 Programmed
Cutsburn Road Stewarton Full Length £74,800.00 Programmed
Irvine Road Kilmaurs Full Length £21,505.00 Programmed
Newmill Road Dunlop Full Length £76,500.00 Programmed
Middlefield Drive Muirkirk Full Length £14,450.00 Programmed
Poole Avenue Ochiltree Full Length £5,950.00 Programmed
Broom Cresent Ochiltree Remaining Length £12,750.00 Programmed
Douglas Brown Avenue Ochiltree Full Length £12,750.00 Programmed
Dalgleish Avenue Cumnock Full Length £26,350.00 Programmed
McLymont Court Cumnock Full Length £24,480.00 Programmed
Holland Crescent Cumnock Full Length £47,600.00 Programmed 52

Page 53

Appendix 2  East Ayrshire Footway Structural Maintenance Programme 2022/23 
Section Street Name Location Environment Footway
Material Length Average
Width Treatment Area Cost
New
Cumnock Loch View Full Length
Both Sides Residential Bituminous 300 2
New PCC
Kerbs,
reconstruct,
HRA
600 £22,800
Patna Blaney
Avenue
No12 to
Main Street Residential Bituminous 144 3.25
New PCC
Kerbs,
reconstruct,
HRA
468 £14,976
Dalmellington Broomknowe
No 33 to
Gateside
Road
Residential Bituminous 106 1.8
New PCC
Kerbs,
reconstruct,
HRA
191 £6,106
Tankard Car Park Cumnock Full Car Park £70,400.00 Programmed
Ayr Road Car Park Cumnock Full Car Park £79,200.00 Programmed
Elizabeth Crescent Cumnock Full Length £36,000.00 Complete
Gemmel Avenue Cumnock Full Length £25,200.00 Complete
C3 Barsminning Road Mauchline From Rail Bridge to U742 Mosshead
Road £17,820.00 Complete
Hughfield Road Mauchline Full Length £55,500.00 Programmed
Carrick View Mauchline Full Length £41,250.00 Programmed
Beechwood Road Mauchline Full Length £69,500.00 Programmed
Jean Armour Drive Mauchline Full Length £112,500.00 Programmed
Cairn Road Cumnock Various Sections £103,950.00 Complete
Park Crescent Dalmellington Full Length £62,370.00 Complete
Main Street Dalmellington Full Length £40,040.00 Programmed   
53

Page 54

Ochiltree Broom
Crescent
No1 to
Gallowlee
Avenue
Residential Bituminous 215 1.8
New PCC
Kerbs,
reconstruct,
HRA
387 £12,384
Ochiltree Mill Street Coachhouse
to A70
Residential Bituminous 200 2 New PCC
Kerbs,
reconstruct,
HRA
400 £12,800
Kilmarnock  Riverbank
Place
No3 to No
19
Residential Bituminous 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Kilmarnock  Western
Road
Various
Sections
Residential PCC Slabs 970 2 New PCC
Kerbs,
reconstruct,
HRA
1940 £62,080
Kilmarnock  Sannox
Road 
No1 to No31  Residential Granolithic 140 2 New PCC
Kerbs,
reconstruct,
HRA
280 £8,960
Darvel Burn Road A71 to West
Donington
Street
Residential Granolithic 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Darvel Ranolcoup
Road
A71 to
Mair's Road
Residential Granolithic 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Cumnock Hearth
Road/Hearth
Road
Car Rd to
Emry's
Avenue
Residential Bituminous 420 1.8 New PCC
Kerbs,
reconstruct,
HRA
756 £24,192
Auchinleck Barbieston
Road
Talbot Drive
to Church
Street
Residential Bituminous 320 1.8 New PCC
Kerbs,
reconstruct,
HRA
576 £18,432
54

Page 55

Kilmaurs Sunnyside B751 to
Yardside
Residential Bituminous 175 2 New PCC
Kerbs,
reconstruct,
HRA
350 £11,200
Stewarton Merrygreen
Place
Full Length
One Side
Residential Bituminous 450 1.8 New PCC
Kerbs,
reconstruct,
HRA
810 £25,920
Stewarton Holm Street One Section Residential Bituminous 40 2 New PCC
Kerbs,
reconstruct,
HRA
80 £2,560
Drongan Watson
Terrace
From Cul-
De- Sac to
Taiglum
Place
Residential Bituminous 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Drongan Taiglum
Place
Watson
Terrace to
lane
Crescent
Residential Bituminous 75 1.8 New PCC
Kerbs,
reconstruct,
HRA
135 £4,320
Crosshouse Kilmarnock
Road
Playingfield
Road to
Gatehead
Road
Residential Bituminous 140 1.2 New PCC
Kerbs,
reconstruct,
HRA
168 £5,376                  
£245,930
55

Page 56

56

Page 57

APPENDIX 2: Environmental Improvement Programme 
Year Project Description of Works Benefit Estimated
Cost 
2020/21 Hayhill, by Drongan, Environmental
Improvement
Kerb, upgrade verge
and form parking bay
Improve environment in village
and road safety by formalising
parking area.  £15,000 
2021/22  Craigie Avenue, Kilmarnock Form Lay-by - street
parking bays
Improve environment and road
safety by reducing on street
parking problems.  £15,000 
Future Years Wellpark Crescent Kilmarnock, widen
road.
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000 
Future Years  Kilmarnock Rd Service Rd Crosshouse,
widen road. 
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years Hillcrest, Bellsbank, Dalmellington
Parking Bays
Form 6 No Off-Street
parking bays
Improve environment and safety by
reducing on street parking
problems.  £15,000 
Future Years  North Hamilton Place Kilmarnock, parking
bays.  Additional Parking Area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years  Gateside Road, Galston, widen road. Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000
57

Page 58

Appendix 2 Street Lighting Works Programme 2022/23 
Lighting Capital Programme 2022/23 
Town Location Work Type Estimated
C/F Cost
Comments Variance +/-
Dalrymple Church Street Area Carry forward from
2021/22  On Site £45k Complete 
Kilmarnock  Lomond Road Area Carry forward from
2021/22 on Site £15k Complete 
Darvel Glen Cres and Hutchison
Dr
Carry forward from
2021/22 £45k 95%
Complete 
£105k        
Town Location Work Type Estimated
Programme
Cost
Comments Variance +/-
Hurlford
Sherwood Road, Liffnock
Avenue, Cessnock Ave,
Cessnock Drive,
Cessnock Rd
5th Core supplies and
concrete columns £90k On site 
Kilmarnock Ayr Road, Service Road 5th Core supplies and
concrete columns £30k Programmed 
Muirkirk
Pagan Walk, Stoneyhill
Avenue, Wardlaw Ave and
Hawkshaw Terrace
5th Core supplies and
concrete columns £70k On Site 
Dalrymple Barbieston Rd and Cedar
Terrace                                                    
5th Core supplies and
concrete columns £40k Programmed 
£214k   
58

Page 59

LED Lighting Programme Update 2022/23 
Town Lantern
Amount Status Lantern
Tender
Delivery /
start
install
Install
complete
by
New Cumnock & Dalmellington 766 Complete   
Patna & Dalrymple 563 Complete   
Mauchline,Sorn & Catrine 957 Complete   
Ochiltree & Drongan 562 Complete   
Auchinleck & Cumnock 1535 95% complete   Mar-22
Irvine Valley (including Hurlford & Crookedholm) 1860 Complete   
Kilmarnock South (including Crosshouse,
Gatehead 
& Knockentiber)
2300 complete   Mar-22
Kilmarnock - North East 1135 Lightways Contractor – started Feb
2022
July-Aug
21 Dec-21 90%
Complete
Kilmarnock - North West 1850 95 July-Aug
21 Sep-21 On Site
Kilmarnock - Central 1400 On site   Aug-22
East Ayrshire - Decorative 350 1st stage in progress ( 30% complete),
2nd stage tender to be issued   Aug-22
Logan, Lugar, Cronberry & Muirkirk 390 Tender to be issued   Feb-23
Stewarton, Kilmaurs, Fenwick, Dunlop & Lugton 1420 Tender to be issued   Mar-23 
Current Status 
Programme completed conversions
to date
8,402 Replacement programme 78% complete
Overall LED units completed 13,986 LEDs now 82% of total EAC inventory 
LED Programme Funded Replacement Works 
59

Page 60

During our design works for our LED conversions, we have identified a number of older installations in East Ayrshire where it is not practicable to simply
replace the existing discharge lighting with LED lanterns. Consequently we propose full lighting replacement projects for the following locations funded
from the LED replacement budget. 
Town Location Estimated
Cost
Fenwick
Glebe Terrace £20k
Mansheugh Road £35k
Skernieland Rd Area £30k
Galston Orchard Street £35k
Kilmarnock
Ellisland Drive Area £45k
Gibson Street, Stevenson Street, Carmel Avenue Area £110k
Glasgow Road, B7038 £70k
Greenan Road, Dunure Rd, Wilson Avenue, Melville St Area £120k
Samson Avenue and Linfern Avenue Area £95k
Woodstock Street Area £50k
Stewarton Clerkland Road Area £70k
Total £680k 
60

Page 61

APPENDIX 2: Bridge and Culvert Strengthening Programme 
Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond 
Bridge Strengthening and Replacement   
U22/10  Burnfoot Bridge, near Darvel
Replacement – Near tender ready. Land
acquisition outstanding   £444,000 
C127/10  Low Ashyard Bridge
Infilling of bridge by Historical Railways Estate.
EAC part contribution  £5,000   £180,000 
U26/10
West Clerkland Bridge, near
Stewarton
Replacement – currently closed to traffic; near
tender ready.  CPO required to obtain land
acquisition. Construction likely to be in future
year programme 
£12,000   £300,000 
B730/10
Littlemill Bridge, near
Rankinston
Replacement - near tender ready; land
acquisition to be concluded; construction likely
to be in future year programme   £6,000  £720,000 
A71/280/C8
0
Mathews Burn Culvert, West
Donnington St, Darvel
Replace section of culvert below West
Donnington Street; design  on going and near
tender ready, land acquisition to be
concluded.
£5,000  £144,000 
B713  B713 Road Slip south of Sorn  Detailed design and construct sheet piled wall   £312,000 
B705  B705 Road Slip centre of Catrine  Detailed design   £18,000  £720,000 
B705  B705 Road Slip north of Catrine  Detailed design   £18,000  £360,000 
Various  Investigative works  Topographical surveys, paint surveys, etc   £6,000  £6,000 
C108/00/C4
4 Gateside Farm Culvert
Replacement with box culvert units –
contract awarded – start March 2022
Completion end of May   £102,000 
A735/130/C Gills Burn Culvert, Dunlop
Part deck replacement and Retaining Wall
Repairs - design in  2022/23 and  £10,000   £180,000 61

Page 62

58 construction in future year programme
62

Page 63

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
U45/10 Kirkland Bridge, Springside
Replacement of boundary bridge - North Ayrshire
Council is lead authority. East Ayrshire Council
funding 50% in 2022/23
£54,000  
U751/10 Crossflats Bridge Replacement – design by consultant  £60,000  £390,000
U760/00/C9
3 Glenhead Culvert Replacement  £42,000 
U740/10 Barbieston Bridge Boundary Bridge Replacement – design by
consultant  £24,000 £600,000 
Cessnock Ave, Hurlford Retaining Wall replacement works on site.  £36,000 
U44/10 Bruntland Bridge Strengthen and refurbish  £24,000 £300,000 
Upgrade Works identified from inspections   
B705/10/C
91 Cowan Place Culvert, Catrine Masonry repairs/scour repairs  £24,000   
B705/20  Shellies Bridge, Catrine
Scour repairs; masonry training wall repairs and
culvert extension – Consultant appointed to
undertake design & works ongoing; land
acquisition  required. Construction in future year
programme 
£6,000   £144,000 
A71/300  Priestland Bridge
Retaining Wall strengthening – finalise design,
conclude land acquisition/servitude and
construct.Tender evaluation.  £120,000   
U764/10 Glenmuir Bridge Scour repairs £42,000  
A70/130/W
31 Thornwood Wall, Lugar
Replacement - Consultant appointed to
undertake design which is ongoing; land 
acquisition required. Construction in future year
programme
£6,000  £360,000 
Queens Crescent, Newmilns  Replace riverbank retaining wall.tender being
evaluated.
£325,000    
Galston to Newmilns Cyclepath  River realignment works – additional rock
armour works.Works Complete
£72,000   63

Page 64

B741 Coal Glen Embankment
Slip, near Dalmellington
Ground investigation complete. Consultant
finalizing design & tender package. Land
acquisition required. Construction potentially in
2022/23.
£24,000  £360,000 
64

Page 65

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond      
A713/60/C6
1 Polnessan Upper Bridge
Extension of culvert. Design and land
acquisition in 2022/23. Construction in future
year programme.
£24,000  £180,000
C90/35/CG0
2 Cattle Grid
Replacement of cattle grid and bypass
improvement.. Tender ready. Est £30,000
Funded by WF developer   
A736/60/C8
4 Lochridge Culvert  Masonry and drainage repairs £60,000   
F/LUGA/10
Logan to Park Terrace Footbridge,
Lugar
Replacement of footbridge deck.on refurbished
abutments. Consultant design ongoing  £150,000 
B705/20/C6
8 Smithy’s Culvert, near Catrine Replace with box units - future year programme   £84,000
B741/40/C7
9
Polmathburn Bridge, near
Dalmellington
Replace damaged deck slabs - future year
programme   £90,000 
A71  Dundonald Rd Bridge
Refurbish –  replace expansion joints,
waterproofing, drainage, surfacing – design.
Construction in future year programme.  £36,000  £1,200,000 
A71  Riccarton Viaduct
Refurbish – paint, replace expansion joints,
waterproofing, drainage, surfacing – design.
Construction in future year programme.  £36,000  £1,440,000 
A71  River Irvine Bridge
Refurbish – paint, replace expansion joints,
waterproofing, drainage, surfacing - design.
Construction in future year programme.  £36,000  £2,040,000 
B741/50 Nith Lodge Bridge
Replacement. Appoint consultant for
design and construction in future year  £54,000   £480,000 
Annick Water, Stewarton
Replacement of collapsing gabion
training wall. Detailed design by
consultant and construction   £378,000 
U/LOGA/10 Old Lugar Bridge Strengthening, masonry repairs and
scour protection £300,000  
C129/30 Chapeltoun Bridge Masonry repairs, Parapet heightening
and scour protection 90% Complete. £120,000  
65

Page 66

C85/10 Fenwick Bridge Masonry refurbishment £24,000  £150,000
66

Page 67

Structure
Reference
Structure Name Proposed Works Revised
Estimate
of Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
B7036/10 Lugar Bridge, Ochiltree Major refurbishment – design in FY
2022/23, construction in future year  £24,000 £840,000
U720/20 Lane Burn Bridge Masonry refurbishment 90% Complete. £70,000  
U/KMCK/20 West Shaw Street Bridge Strengthen and Refurbishment   £600,000
C135/20 Avon Bridge Masonry and scour repairs  £36,000 
U736/10/C65 Sykeside Bridge Scour repair  £24,000 
U729/00/C64 Hayhiolm Bridge Masonry and Scour repairs  £36,000 
U729/00/C71  Barry Burn Culvert Masonry and Scour repairs  £36,000 
U730/00/C37 Culvert Masonry and Scour repairs  £36,000 
C36/10 Nith Bridge Masonry parapet rebuild and repairs to
commence end of August 2022  £60,000 £60,000
A70/100 Gatehouse Bridge Parapet heighten, scour repairs &
masonry repairs  £24,000 £180,000
A70/110/C46 Rose Burn Bridge Masonry and scour repairs  £24,000 £120,000 
Broomknowe Retaining Wall Design in 2022/23, construction in future
years  £24,000 £150,000
W/MUIR/20 Muirkirk Shops Retaining
Wall Design in 2022/23, construction in future years  £24,000 £150,000       
Parapet Upgrades     
A70/70  Burnock Bridge, Ochiltree  Parapet and other masonry repairs 
£216,000   
A713/90  Dunaskin Bridge, Waterside 
Widening to create footway and replace both
masonry parapets - design ongoing. 
£70,000   
A735/20  Victoria Bridge, Kilmarnock Site works ongoing re  replacement of
substandard vehicle parapets; deck expansion
joints and paint superstructure, waterproofing
and resurfacing.Works Substantially complete 
£570,000   
67

Page 68

B743/80 Cleuch Bridge, Sorn Upgrade of parapets and install footway  £90,000   
68

Page 69

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of Projects
C/F into
2022/23
Estimate of
new
projects for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
A713/70/C53 Drumgrange Bridge Upgrade of parapets, masonry repairs –
works ongoing £6,000  
C134/10 Ranoldcoup Bridge, Darvel  Masonry repairs and heighten parapets  £24,000  £240,000  £48,000
B769/40 Corsehill Mill Bridge Parapet replacement – design in FY 2021/22  £12,000 £150,000
B7082/10 Townhead Bridge Parapet replacement  £150,000 
B743/135/C5
0 Beacon Hill Culvert Headwall Repairs   £36,000
W/NCUMN/1
0 Burnside Retaining Wall Replacement £36,000  
U8/00/C8 Hendryton Burn Culvert Scour and masonry repairs works on site. £48,000         
Rail Incursion   
C23/10 Rigg Road Rail Bridge,
Cumnock Safety fencing - future year programme   £20,000       
Non ARA  Council Footbridges     
Various sites Design, investigation  £120,000 £120,000
F/HURL/10 Portland Brae Footbridge Load Assessment, paint and replace concrete
planks £230,000  
F/CATR/20 Institute Ave Footbridge, Catrine Refurbishment £72,000         
Principal Inspections     
Various Principal Inspections of bridge stock by
consultant and in-house staff  £216,000 
TOTAL £3,037,000 £3,000,000 £12,434,000
69

Page 70

TOTAL  (Estimated Carry Forward + new
allocation)
£6.037m 
70

Page 71

APPENDIX 2: Traffic, Transportation and Road Safety Programmes 2022/23
(i) Road Safety Programme 
(ii) Safer Neighbourhoods 
Town Location Proposed Scheme
Mauchline Cowgate Traffic management review
Kilmarnock Prestwick Place, Fardalehill Traffic management 
Kilmarnock Sutherland Drive Traffic calming
Galston Cessnock Road at Bowling Club Pedestrian build-out
Town/Route Location Proposed Scheme
Hurlford A71/B7073 roundabout AIP junction assessment
Kilmarnock Hurlford Road 30mph speed limit extension
Auchinleck Barony Road Speed Limit extension and gateway improvements
Dalmellington High Main Street, Churchill, Knowehead Road safety improvements
B742 Dalrymple B742 gateway entrance to Dalrymple Enhanced gateway features including vehicle activated sign
B7034 Hollybush Hollybush 30mph speed limit
A713 Waterside Waterside 50mph speed limit
Auchinleck Various Waiting restriction amendments
Lugton Dunlop Road Speed limit signing improvements
Galston Brewland Street Extension of 30mph speed limit
Kilmarnock A71 Campbell St off slip Signalisation assessment
Kilmarnock A71 West of Bellfield I/C Road safety signing
Stewarton Dunlop Road Pedestrian Refuge
71

Page 72

Mauchline Mansfield Road Traffic management review
Stewarton Various roads 20mph speed limit orders amendments
Kilmarnock Whatriggs Road 20mph speed limit amendments
Cumnock Glaisnock Road Possible speed reduction measures
Kilmarnock Foregate Square Permanent pedestrianisation scheme
Various Various locations Vehicle activated signs upgrade 
(iii) Rural Route Action Plans 
Route Proposed Scheme
B778 B778 Fenwick to Stewarton Route Study 
(iv) Cycling, Walking and Safer Streets (CWSS) 
Town Location Proposed Scheme
Crosshouse/Kilmarnock  B7038 Kilmarnock to Crosshouse  Cycle route between Fardalehill and Crosshouse via hospital
Crookedholm Grougar Road  Grougar Rd localised road widening and pedestrian crossing facility
Fenwick Kirkton Rd/Main St – Fenwick PS  Pedestrian improvements/school street investigation
Dunlop A735 Lugton Road Pedestrian crossing improvements
Dalrymple B742 Barbieston Road Traffic calming and pedestrian crossing facilities
Mauchline Loudoun Street Pedestrian crossing assessment
Kilmaurs Main Street Improved pedestrian facilities
Crosshouse Crosshouse-Dundonald Cycle route feasibility study
Cumnock Netherthird School Streets Project
Newmilns Loudoun Road Pedestrian Crossing Investigation
Crosshouse B751 Gatehead Road Pedestrian Crossing Installation
Kilmarnock Kilmaurs Rd at Hillhead PS Pedestrian Crossing Installation
Darvel East Main St/Murdoch Road Junction sightline improvement
72

Page 73

Various Various locations  Cycle and scooter parking at schools and other locations 
(v) Strathclyde Partnership for Transport (SPT) 
Location Project
Kilmarnock Phase 3 refurbishment of Kilmarnock bus station to upgrade concourse and stance areas.
Kilmarnock Glasgow Road bus park & ride 
Fenwick Footway improvements for access to X77 bus service 
(vi) SUSTRANS 
Location Project
Hurlford Hurlford Street Design Project
N/A East Ayrshire Active Travel Strategy 
73

Page 74

Appendix 3 EV Chargers     
EAST AYRSHIRE PUBLIC CHARGERS      
CYC Ref Type Make Location Replacement Cost
51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £8,000
51210 22kw eVolt Foregate Car Park, James Shaw Crescent, Kilmarnock, KA1 1LU £9,000
50821 22kw eVolt Multi Storey Car Park, Kilmarnock, KA1 1LU £9,000
51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH £9,000
52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £9,000
52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB £30,000
52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £9,000
52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £30,000
50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW £9,000
51170 Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £30,000
50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP £9,000
50815 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR £30,000
52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU £30,000
52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE £30,000
52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG £30,000
74

Page 75

52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS £9,000
52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB £30,000
52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £9,000
52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ £8,000
52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB £9,000
52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY £9,000
52962 Rapid eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £30,000
52963 22kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £9,000
53080 7kw eVolt Netherthird Community Centre, 65 Ryderston Drive, Cumnock, KA18 3AR £8,000
53778 Rapid eVolt Main Street Car Park, Muirkirk £30,000
53775 22kw eVolt Rose Reilly Sports Centre, Stewarton £9,000
53776 7kw eVolt Standalane Car Park, Stewarton £8,000
60786 7kW eVolt Academy Street, Hurlford £8,000
Awaiting commissioning  22kW eVolt Drongan Centre car park, Mill of Shield Road £9,000
Awaiting commissioning  22kW eVolt Carnshalloch Avenue car park, Patna £9,000
Awaiting commissioning  22kW eVolt New Cumnock Outdoor Swimming Pool car park £9,000
Awaiting commissioning  22kW eVolt Gatehead Road car park, Crosshouse £9,000
Awaiting commissioning  7kW eVolt Queen Street car park, Kilmarnock £8,000
Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000
75

Page 76

Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting programme of
works 7kW eVolt Brown's Road car park, Newmilns £8,000     
EAST AYRSHIRE FLEET CHARGERS      
CYC Ref Type Man. Location £9,000
52043 22kw eVolt Transport Depot, Crookedholm £8,000
52044 7kw eVolt Transport Depot, Crookedholm £8,000
52045 7kw eVolt Transport Depot, Crookedholm £8,000
52046 22kw eVolt Cleansing Depot, Western Road, Kilmarnock £9,000
52047 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
52048 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
51897 7kw eVolt Holmquarry House, Kilmarnock £8,000
51914 7kw eVolt Holmquarry House, Kilmarnock £8,000
51881 7kw eVolt Croft Street, Kilmarnock £8,000
51882 7kw eVolt Croft Street, Kilmarnock £8,000
51883 7kw eVolt Croft Street, Kilmarnock £8,000
52964 Rapid eVolt Croft Street, Kilmarnock £30,000
52950 7kw eVolt Strand Street, Kilmarnock £8,000
52951 7kw eVolt Strand Street, Kilmarnock £8,000
52952 7kw eVolt Strand Street, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting programme of
works 22kW eVolt Croft Street, Kilmarnock £9,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000
76

Page 77

SOUTH AYRSHIRE CHARGERS        
CYC Ref Type Make Location  
51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW £8,000
51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU £8,000
51535 Rapid eVolt Burns Statue Square, Ayr, KA7 UT £30,000
52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN £9,000
52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY £9,000
50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £9,000
50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ £9,000
50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF £9,000
52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG £9,000
50816 Rapid eVolt Girvan Harbour, Girvan, KA26 9AG £30,000
52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR £9,000
52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH £30,000
52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU £30,000
52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE £8,000
52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE £30,000
52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £30,000
52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL £30,000
53774 Rapid eVolt Academy Street, Troon £30,000
53773 Rapid eVolt Lodge Road Car Park, Turnberry £30,000
53777 22kw eVolt Burnside Road, Monkton £9,000
Awaiting commissioning 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly £9,000
Awaiting commissioning 22kw eVolt Inches Close car park, Maybole £9,000
77

Page 78

Awaiting commissioning 22kw eVolt Tarbolton Community Campus car park, Tarbolton £9,000
Awaiting commissioning 22kw eVolt Dundonald Primary School car park, Dundonald £9,000
Awaiting commissioning 22kw eVolt Mossblown Activity Centre car park, Mossblown £9,000
Awaiting commissioning 22kw eVolt Kirkoswald Main Street car park, Kirkoswald £9,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting programme of
works 22kW eVolt Barrhill Community car park, Main Street, Barrhill £9,000 
78

Page 79

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
Date:  September 2022 
Report by the Head of Roads - Ayrshire Roads Alliance   
_____________________________________________________________ 
WINTER SERVICE REVIEW PROGRESS REPORT 
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this Report is to provide the Joint Committee a Review of the
Winter Service for 21/22. 
RECOMMENDATIONS 
2. The Committee is recommended to: 
(i) Note improvements introduced for 2021/22 Winter Season
(ii) Note winter and other emergencies funding levels in relation to
current levels of service. 
BACKGROUND 
3. A comprehensive review of winter maintenance was carried out prior to last
winter.  For context, we experienced an average winter with some sub-zero
temperatures during the month of February ’22.  The combined figures for
winter 21/22 across both East Ayrshire and South Ayrshire are noted below: 
Year     Salt Used (t)   Treatment Runs
2021/22   11,689    2,299
2020/21   17,647    3,016
2019/20   14,390    2,676
2018/19   14,989    2,873 
Proposed Winter Service Improvements 
4. From gritting routes being established in 1996, they have only been fully
reviewed once in that time.  SAC existing Priority 1 gritting routes treat
507.63km (43.12%) of the overall public road network of 1177.30km.  However,
442.11km (37.55%) of the public road network is travelled as part of a Priority 1
gritting operation. EAC existing Priority 1 gritting routes treat 563.88 km
(46.29%) of the overall public road network of 1,218.11km.  However,
347.40km (28.52%) of the public road network is travelled as part of a Priority 1
gritting operation.   
Agenda Item 6
79

Page 80

5. Last winter the Ayrshire Roads Alliance (ARA) proposed to undertake a gritting
route optimisation exercise to optimise our current gritting routes to ensure that
they are efficient and effective.  We were unable to achieve this exercise and
propose to undertake this during winter 22/23.  This includes; Route Design
Consultancy, Software Licensing, Training, and producing Support Packs. 
From this investment, ARA can optimise all gritting routes this year and in
future years.  This improvement is being funded from existing budgets.  The
costs to enable the aforementioned optimisation process for P1 routes will be in
the region of £41k. 
6. Prior to winter 20/21 a list of ‘wet spot’ locations was identified with associated
risk assessments to determine appropriate mitigation measures. In accordance
with the Risk Register planned maintenance and improvement drainage works
were programmed to alleviate the risk from the public network.  Our operational
depots worked together with drainage contractors throughout 20/21 targeting
these issues made great progress reducing this list of wet spots prior to winter
of 21/22 commencing.  We have now addressed the wet spots and can confirm
we no longer have drainage issues outstanding which would cause wet spots
across our network during winter months.  There will remain however, areas of
run off from fields which the ARA ensure are blasted with salt in times of
freezing temperatures. 
In addition, there is no protocol for the provision of ‘ice’ signs at known
hazardous locations. This may expose the Council to potential litigation
challenges.  ARA reviewed our network in line with historical data and placed
ice signs in known hazard locations. 
7. Extensive works have been carried out to improve the winter information we 
publish on the Ayrshire Roads Alliance website and current Winter Service 
Plan.  Following feedback from stakeholders, who identified that the winter
information the Ayrshire Roads Alliance previously provided was not easily
identifiable, in particular the level of detail that could identify if a road was on an
established gritting route, was not easy to find. 
The Ayrshire Roads Alliance, on behalf of East and South Ayrshire Council,
appointed an external contractor TrueView Visuals, to develop and improve
digital information relating to winter gritting and grit bins, this resulted in the
development of Gritter Tracking. 
8. Gritter Tracking, tracks the position of gritters operating within East and South 
Ayrshire, in real time, and can be accessed from any digital device.   
This provides:
• details of out of hours winter service vehicle operations
• gritting information which is stored for 10hrs 
• details of when a grit bin was last filled 
• opportunity for the public to request that a grit bin is filled
• details of all streets on Priority 1 (P1) gritting routes
9. The treatment of the footway routes across ARA network involves assistance
from others.  As well as ARA internal Roads Maintenance Unit, EAC Outdoor
Services and Private Contractors in East Ayrshire are also on hand to assist
80

Page 81

with salt spreading and brine treatments.  This has being reviewed for 2021/22
to ensure our Footway Treatment Routes remain fit for purpose and will
continue to be reviewed for 2022/23.  ARA are in the process of procuring a
suitable contractor for winter 2022/23. 
10. Grit bins are placed across the network and historically were uplifted and
returned to the roads depots.  However, this was considered operationally
resource demanding and not necessary. Grit Bins now remain on site
throughout the entire year.  During the winter of 21/22 the ARA monitored grit
bins that could be subject to acts of vandalism and theft.  From this we found a
very small amount of bins were vandalised and others being used as rubbish
bins.  None were stolen.  From the review, we have agree the option to leave
on site remains fit for purpose.
11. Grit Bin/Community Grit Bin locations are published on the ARA website.   
ARA will include site specific bin location plans on the Council's website.  Using
postcode information, members of the public can find their nearest grit bin.  Grit
bin request forms have been improved to ensure uniformity across SAC and
EAC and to allow ease of use by residents highlighting mandatory fields where
ARA Engineers can make a quicker decision/response for the resident.  The
website also now has the ability to request a grit bin to be filled.
12. The treatment decision process is defined within the approved Winter Plan. 
The existing process has proved to work well during periods of adverse
weather conditions.  This process has been reviewed following Winter 21/22 to
determine that it is still fit for purpose.  During Winter 21/22 the ARA had 2no.
Winter Controllers (WC) on each week over the Winter Period, one for East
Ayrshire Council and one for South Ayrshire Council.   
However during Nov ‘21 to Feb ’22, some decisions were made by one WC
across ARA.  This proved to be a more efficient and cost effective way to
manage the winter decision making process, reducing the time taken to make
decision across both local authorities, which in turn allows the Winter
Supervisors to programme the next day’s programme of works more timeously. 
We have 3 experienced and trained WC’s for winter 22/23, who will deliver the
winter decisions across ARA for all 6 domains on a rota basis of one week on
and two week’s off. 
13. Previously the Gritting regime allowed for 24/7 gritting treatments.  A review of
gritting treatment hours was carried out in 20/21 and treatments were reduced
between the hours of 2200hrs and 0500hrs Mon-Sun only, however in extreme
conditions and where the forecast merited action, treatments were actioned
during these times. We continued with 24/7 standby cover.  There is little
benefit and high cost associated with treating roads when traffic is minimal, to
be fully effective, de-icing requires the actions of vehicles to aid dispersal and
to break up snow and ice. 
ARA highlighted the clear advantage for savings which could be found as
shown under Item 3 above with the reduction in used salt and treatment runs. 
81

Page 82

The Winter Controllers actioned treatments out with the hours of 2200hrs-
0500hrs where the forecast allowed. 
Comparison of the number of treatment runs has been reviewed over the last 2
winters: 
2020/21  2021/22
642   371 
14. With regards de-icing materials, we currently use 6mm Rock Salt (10mm Rock
Salt uncovered) for our Carriageway treatments and brine for footway routes in
Kilmarnock Town Centre.  A review of de-icing materials was carried out in
winter 19/20 to consider pre-wetted and brine on our carriageway routes.  ARA
and Transerv worked well together and ARA utilised their Specialised Brine
tanks within their depot in Ayr.  ARA trialled an 18t Pre-wet and Brine vehicle
from an External Contractor which proved to show a small profit, however due
to it not being utilised until December ’19 we did not reap the full benefits for the
entire winter.   
We hope to procure another pre-wet and brine vehicle for winter 22/23.  We will
trial one route from our Meadowhead Depot.  Efficiency and cost of this process
will be monitored throughout winter to determine savings for future winters.   
15. The Winter Service Plan is issued and made available to an agreed distribution
list (2.3.1 in the Plan).  This document will be reviewed and updated annually
prior to winter commencing in October to include revisions/changes to the
service delivery. 
POLICY/COMMUNITY PLAN IMPLICATIONS 
Communication 
16. Winter Controller (WC) and Winter Supervisor (WS) current Roles and
Responsibilities are detailed in the Winter Plan. WINTER SERVICE PLAN 20 -
21 (ayrshireroadsalliance.org) This is being reviewed for the coming winter
2022/23 & roles clearly defined for the responsible officers. 
17. Summer Controller (SC) was introduced in 2018/19 to improve Communication
across the Service.  Duties include: 
•  Risk to Communities, SC will contact Senior Management immediately, from
this the SC will then escalate to Chief Executive, Elected Members and
Community Councils
•  SC assesses the Met Office forecast on a daily basis & will email Senior
Management when preparations are required for a forecasted event i.e. high
winds, severe cold weather, hot weather, heavy rain etc.
•  SC have familiarised themselves with Organised Events across Ayrshire
•  SC have familiarised themselves with the protocol for Esplanades (SAC) i.e.
in heavy rain/wind events, car parks are closed off to ensure safety of road
users
82

Page 83

19. Community involvement in Winter Service provision.  Over the last 6 years we
Have engaged with Community Councils to assist with Winter Resilience
Groups. During COVID19 lockdown the uptake was less due to the
requirement for physical distancing and isolation during 2019/20.   However
from a total of 44 groups in 2018/19, we now currently have 132 groups
assisting with self-help footway gritting, where we provide training, salt
materials, equipment and PPE.  Engagement with further groups is taking
place on the lead up to winter 2022/23. 
The ARA were the proud winners of the Winter Maintenance Award for
resilience groups in March ’22.  
FINANCIAL IMPLICATIONS 
Winter Total Costs 
20. The overall total cost of winter 20/21 and last winter 21/22 (excl. fuel) are
noted in the tables below.  An overall saving of £475,080 was made last
winter compared with the previous winter. 
Contractor costs include plant, materials (brine) and resources.  These costs
are higher for EAC as they required more carriageway and footway routes to
be covered by Contractors than in SAC.  Hired Plant is for all hires which do
not include operator (PMG). 
20/21 
Labour Materials Hired
Plant
Fleet/
Plant
Contractors TOTAL
OUTTURN
SAC £173,384 £304,821 £115,490 £4,080 £73,757 £671,532
EAC £134,494 £425,382 £51,589 £13,006 £297.529 £922,000 
21/22 
Labour Materials Plant Fleet/
Plant
Contractors TOTAL
OUTTURN
SAC £72,378 £162,368 £124,080 £3,348 £46,425 £478,323
EAC £77,577 £262,902 £48,442 £4,605 £203,929 £640,129 
HUMAN RESOURCES IMPLICATIONS 
21. The Winter Service Review has no direct impact on human resources. 
EQUALITY IMPACT IMPLICATIONS 
22. The Winter Service Review has no direct impact on Equality. 
RISK IMPLICATIONS 
23. Winter was delivered within budget and funding for the Winter Service Delivery
is not an area of concern should it remain the same for winter 22/23.  The
83

Page 84

budget allocation for Winter 2021/22 was £550,000 (SAC) & £683,190 (EAC). 
In context, we experienced an average winter with some sub-zero temperatures
during the month of February ’22 and much milder temperatures throughout
March ’22 than in 20/21.  From this, we can say that should we experience a
below average’ winter, this may cause a financial challenge to remain within
budget again. 
TRANSFORMATION STRATEGY 
24.  This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
• “Maximum value for our communities”, by ensuring the various elements of 
the Ayrshire Roads Alliance improves transport provision across the
networks.. 
BACKGROUND PAPERS 
None 
LIST OF APPENDICES 
Kevin Braidwood
Head of Roads
18 August 2022 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org
84

Page 85

AYRSHIRE SHARED SERVICES JOINT COMMITTEE 
2 SEPTEMBER 2022 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: PROCEDURE RELATING TO THE INSPECTION OF AYR SOUTH
PIER 
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this Report is to advise the Joint Committee on the proposed
procedure relating to the inspection of Ayr South Pier. 
RECOMMENDATIONS 
2. It is recommended that the Joint Committee: 
(i) Agrees the proposed procedure regarding Ayr South Pier. 
(ii) Otherwise, notes the content of this report. 
BACKGROUND 
3. The British Transport Docks Board sold Ayr South Pier in 1971 to the Royal
Burgh of Ayr for £33,000. 
4. Disposition documents detail the legal agreement and the responsibilities of
both parties in relation to the disposition including that the Royal Burgh of Ayr
are responsible for maintenance. 
5. As a result of The Local Government Act 1973, Strathclyde Regional Council
was created in 1975 and they assumed responsibility for maintenance of
piers, harbours and slips as dictated by the legislation. 
6. Within The Local Government Act 1982 a differentiation was made between
marine structures that had a transport, fishery or commercial function and
those which generally fulfil a leisure orientated function with Ayr South Pier
being classed as the latter. At this time SRC officers were instructed by senior
management to enter into disposal of leisure orientated marine structures to
District Councils or other interested parties. 
7. SRC and Kyle and Carrick District Council entered into discussions regarding
the disposal of the asset with Kyle and Carrick refusing to take
ownership.SRC retained maintenance responsibility for the pier. 
Agenda Item 7
85

Page 86

8. In 1996 the responsibilities for Kyle and Carrick and Strathclyde Regional
Council transferred to the unitary authority South Ayrshire Council. 
9. The Ayr South Pier currently sits within Ayr Common Good and Ayrshire
Roads Alliance current responsibility is to inspect the supporting structure only
and advise South Ayrshire Council of any defects and carry out repairs under
instruction. 
10. An insurance claim was raised by a pedestrian who tripped on a surface
defect on the pier deck, this raised the issue of inspection which was brought
to the attention of South Ayrshire Council in 2017 by Ayrshire Roads Alliance
following correspondence with a former ward member, but was never acted
upon by the administrators of the Ayr Common Good. 
DETAIL 
6. Following discussion with South Ayrshire Council, the Head of Ayrshire Roads
Alliance agreed to take responsibility for all inspections and prioritise
maintenance works which will be communicated to South Ayrshire Council
Asset Management Team for formally instructing and to ensure this is
recharged to Ayr Common Good. 
7. The procedure relating to the inspection of Ayr South Pier is contained in
Appendix 1 and details the following;  
• Responsibilities/ownership
• Lifebuoy Inspections
• Walking Surfaces and Fencing
• Sub-Structure Inspection
• Underwater Dive Survey
• Special Emergency Inspections
• Records Keeping 
POLICY/COMMUNITY PLAN IMPLICATIONS 
18. None. 
LEGAL IMPLICATIONS 
19. There are no legal implications. 
HUMAN RESOURCES IMPLICATIONS 
20. The inspection of the pier will be absorbed within existing resources. 
EQUALITY IMPACT IMPLICATIONS 
21. None 
FINANCIAL IMPLICATIONS
86

Page 87

22. South Ayrshire Council Asset Management Place Directorate are responsible
for funding and instructing repairs by Ayrshire Roads Alliance. 
RISK IMPLICATIONS 
23. Failure to have a robust inspection and maintenance regime of the pier may
result in further claims for injury. 
TRANSFORMATION STRATEGY   
24. None 
BACKGROUND PAPERS
None
LIST OF APPENDICES 
Appendix 1 – Procedure Relating to the Inspection of Ayr South Pier 
Kevin Braidwood
Head of Roads - Ayrshire Roads Alliance
08 August 2022 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
87

Page 88

88

Page 89

89

Page 90

90

Page 91

91

Page 92

92

Page 93

93

Page 94

94

Page 95

95

Page 96

96

Page 97

97

Page 98

98

Page 99

99

Page 100

100

Page 101

101

Page 102

102

Page 103

AYRSHIRE SHARED SERVICE JOINT COMMITTEE
2 SEPTEMBER 2022
Report by the Head of Roads - Ayrshire Roads Alliance     
________________________________________________________________
_
AYRSHIRE ROADS ALLIANCE
RISK REPORT AND REGISTER    
________________________________________________________________
_ PURPOSE OF REPORT
1. The purpose of this Report is to advise the Joint Committee on the management
of risk associated with the Ayrshire Roads Alliance.
RECOMMENDATIONS
2. It is recommended that the Joint Committee:
i. Notes the risk register presented in this report;
ii. Continues to receive updates on progress; and
iii. Otherwise, notes the content of the report.
BACKGROUND
3. A report detailing the general approach to the Risk Report and Risk Register was
presented to the Joint Committee on 21 August 2014, where it was agreed that
the Risk Report and Risk Register would be a standing item on the agenda.  This
would ensure that the risks are monitored and scrutinised at a minimum of a
quarterly basis.
MAIN REPORT/MAIN ISSUES
4. The management of risk aims to enable confident decision taking on risk and
innovation, reduce waste and inefficiency, and lead to fewer unanticipated
problems and crises that could undermine the performance and operation of the
Ayrshire Roads Alliance.
5. The Risk Register is now in a new and improved format which will make it easier
to review the individual risks which are now in a colour coded format.
6. The resulting revised risk register is contained in Appendix 2.
Since the last Joint Committee, the following risk has been added:
67 – Ukrainian Crisis - Increasing cost of bitumen and the potential of short
supply due to Russian sanctions and increased costs.
68 – Fuel Crisis - No longer permitted to use red diesel within construction
vehicles. This has an impact on project costs and the overall programme
Agenda Item 8
103

Page 104

The revised risk register illustrates the red, amber and green status and also
illustrates whether the risk severity relates to time, indicated by [T] or cost,
indicated by [C]. 
POLICY/COMMUNITY PLAN IMPLICATIONS 
7. A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire. 
8. The matters referred to in this report contribute to South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’. 
LEGAL IMPLICATIONS 
9. The Risk Register is a management tool and this will not replace the existing
statutory returns for risk and performance related information. 
HUMAN RESOURCES IMPLICATIONS 
10. The Risk Register has no direct impact on human resources. 
EQUALITY IMPACT IMPLICATIONS 
11. The Risk Register complements the Equality Impact Assessment by ensuring
that any issues arising are adequately prioritised, managed and either eliminated
or mitigated. 
FINANCIAL IMPLICATIONS 
12. The Risk Register facilitates the existing scrutiny arrangements to manage,
prioritise, and review the budget provided by East Ayrshire Council and South
Ayrshire Council to the Ayrshire Roads Alliance. 
RISK IMPLICATIONS 
13. The Risk Register assists in the prioritisation of risks that need to be mitigated
by the Ayrshire Roads Alliance in order to reduce the overall risk to either Council
and to comply with the Community Plan/Council Plan in both partner bodies. 
104

Page 105

TRANSFORMATION STRATEGY 
14. This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
• “Maximum value for our communities”, by ensuring the various elements
of the Ayrshire Roads Alliance improves transport provision across our
networks. 
Kevin Braidwood
Head of Roads – Ayrshire Roads Alliance
19 August 2022 
BACKGROUND PAPERS 
None 
LIST OF APPENDICES 
1. Risk Register Scoring Matrix
2. Ayrshire Roads Alliance Risk Register 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
105

Page 106

Appendix 1: Risk Register Scoring Matrix 
The Risk Matrix for deciding each of the risk factors (Likelihood x Severity) in a 5 by 5
matrix are illustrated in Table 1 below: 
Table 1: Risk Factors in Practical Form 
Following on from Table 1, the following Summary Risk Profile is colour coded to highlight
the risk classification: 
Table 2: Summary Risk Profile 
Assessed
Risk (LxS) Action Required
Low Risk: 
1 to 4 
Acceptable/ can be accepted provided risk is
managed.
Medium Risk: 
5 to 12
Undesirable/ must be avoided if reasonably
practicable.
High Risk: 15
to 25 
Unacceptable risk - must be eliminated or moved to
a lower level.
Rare (1) Unlikely
(2)
Possible
(3)
Likely
(4)
Almost
Certain
(5)
Catastrophic
(5) 5 10 15 20 25
Very Serious
(4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Insignificant
(1) 1 2 3 4 5
Risk Likelihood
Risk Severity
106

Page 107

107

Page 108

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
2 September 2022 
Report by the Head of Roads - Ayrshire Roads Alliance   
_____________________________________________________________ 
SUBJECT: AYRSHIRE ROADS ALLIANCE
UPDATE ON PERFORMANCE SCORECARD
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this Report is to advise the Joint Committee regarding the
progress made to date against the Performance Scorecard. 
RECOMMENDATIONS 
2.   It is recommended that the Joint Committee: 
i Notes the performance scorecard presented in this report; 
ii Continues to receive the performance scorecard updates; and 
iii  Otherwise, notes the content of the report.
BACKGROUND 
3  The purpose of the performance management and benchmarking is to work
collaboratively to deliver tangible and sustained improvements within the
Ayrshire Roads Alliance in order to manage the on-going development and
delivery of benchmarking frameworks. 
4. Improved performance management is fundamental to supporting the
Ayrshire Roads Alliance.  This drives change and improvement within the fully
integrated roads service and support improved outcomes, better performance,
and more effective use of resources.   
5. The Performance Indicators are regularly refreshed when new useful
performance measures are introduced by the Ayrshire Roads Alliance or there
is an agreement to include a specific indicator.  This will be a regular item for
the Ayrshire Shared Service Joint Committee to review. 
MAIN REPORT/MAIN ISSUES 
6. This scorecard is collated by the Business Support Manager and used to: 
• monitor the progress in meeting the Ayrshire Roads Alliance’s
objectives;
Agenda Item 9
108

Page 109

• help managers to have performance-related conversations with staff;
and 
• identify any problem areas that need addressed. 
7. Some indicators are collated at different frequencies and so these will be
included as appropriate. 
8. The Performance Scorecard is presented in Appendix 1.  Commentary
against the specific red and amber performance measures are included in
Appendix 1. There are a number of green performance measures which
should be highlighted, especially: 
• Finance with respect to the percentage of invoices paid within 30
calendar days.  This is currently at 98% for this financial year. 
• Priority 1 and Priority 2 Faults – with respect to the percentage of priority
1 and 2 faults completed within timescale.  This is currently above target
for this financial year. 
• Safety Inspections – with respect to the percentage of safety inspections
completed within the timescale.  The service has achieved an average of
98% for this financial year. 
9. The Process Improvement and Integration Plan continues to identify
improvements to a number of existing processes for re-design within The
Ayrshire Roads Alliance. 
POLICY/COMMUNITY PLAN IMPLICATIONS 
10.   A well maintained road network will contribute to achieving the Community
Plan objectives in relation to Economy & Skills and Safer Communities to
maintain good access to our communities within East Ayrshire. 
11.   The matters referred to in this report contribute to South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’. 
LEGAL IMPLICATIONS 
12 The Performance Scorecard summarises the pertinent Statutory Performance
Indicators and this does not replace the existing statutory returns for
performance information. 
HUMAN RESOURCES IMPLICATIONS 
13 The Performance Scorecard has no direct impact on human resources. 
109

Page 110

EQUALITY IMPACT IMPLICATIONS 
14 The Performance Scorecard complements the Equality Impact Assessment by
ensuring that any issues arising are adequately prioritised, managed and
either eliminated or mitigated. 
FINANCIAL IMPLICATIONS 
15 The Performance Scorecard facilitates the existing scrutiny arrangements to
manage, prioritise, and review the budget provided by East Ayrshire Council
and South Ayrshire Council to the Ayrshire Roads Alliance. 
RISK IMPLICATIONS 
16.    The Performance Scorecard assists in the prioritisation of risks that need to
be mitigated by the Ayrshire Roads Alliance in order to reduce the overall risk
to either Council and to comply with the Community Plan/Council Plan in both
partner bodies. 
TRANSFORMATION STRATEGY 
17 This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
• “Maximum value for our communities”, by ensuring the various
elements of the Ayrshire Roads Alliance improves transport provision
across the networks. 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
110

Page 111

2014/16 2015/17 2016/18 2017/19 2018/20 2019/21 2021/22 2013/15 2014/16 2015/17 2016/18 2017/19 2018/20 2019/21 2021/22
2014 2015 2016 2017 2018 2019 2020 2021 % of A Class roads that should be considered for
maintenance 27.06% 21.30% 19.10% 19.80% 21.20% 23% 22.10% 17.20% 42.20% 40.50% 38.60% 38.20% 36.10% 34.40% 34.10% 28.90%
Number of people killed or seriously injured in road
accidents per 100,000 population 25 29 29 33 59 46 36 36 % of B Class roads that should be considered for
maintenance 31.89% 34.20% 34.00% 35.70% 32.20% 32.50% 32.60% 26.80% 50.40% 48.90% 43.90% 40.70% 38.10% 36.90% 37.30% 34.40%
Number of slightly injured casualties per 100,000
population 147 176 138 150 181 86 65 49 % of C Class roads that should be considered for
maintenance 34.22% 40.30% 38.50% 40.50% 40.60% 38.80% 33.50% 29.50% 49.50% 43.90% 40.20% 41.40% 42.40% 42.20% 40.80% 37.90%
% of unclassified roads that should be considered for
maintenance 39.84% 44.90% 45.60% 44.00% 43.70% 42.10% 42.30% 40.90% 42.00% 43.30% 43.30% 41.40% 42.90% 42.30% 43.30% 42.90%
Overall % of road network that should be considered
for maintenance - 39.40% 39.10% 39.00% 38.40% 37.80% 36.80% 33.80% 45.00% 44.10% 42.30% 41% 41.30% 37.80% 40.90% 34.20%
MONTHLY PERFORMANCE INDICATORS APSE
Average Target Current
Status June MONTHLY PERFORMANCE INDICATORS APSE
Average Target Current
Status June
No of invoices paid within 30 days 436 Average days lost per employee - - 0.66
No of Invoices Received 441
% of invoices paid within 30 days 98% Visits to the ARA Website every month -
49,000
per
annum 
2,234
Average Year to date of Number of Invoices paid
within 30 days 98% No of Twitter Followers every month -  4,295
Monthly visits to the website from social media - 1,800 per
annum        2,473
Number of ARA Safety Inspections Completed within
Timescale 46
Number of ARA Safety Inspections Scheduled 47
% of ARA Safety Inspections Completed within
timescale 98%
Number of Health and Safety Incidents Reported to the
Health and Safety Section 3
Average Number of days to report an incident to the
Health and Safety Section 2.3
Target Current
Status June Target Current
Status June Comments Target Current
Status June Target Current
Status June
Number of Public Liability claims closed 6 4 - 
Number of Public Liability claims received 6 4
Total number of open claims 34 30 - 
Number of Public Liability Claims that were successful 1 0
% of Public Liability Claims that were successful 17% 0% Number of Principal Bridge Inspections - 88 0 56 0
-
HEALTH AND SAFETY
92.02% 90%
- -
100%
EAST AYRSHIRE COUNCIL
--Number of staff who have received annual FACETIME
review 15 0
SOUTH AYRSHIRE COUNCIL
-100%
-
PUBLIC LIABILITY CLAIMS
MONTHLY PERFORMANCE INDICATORS APSE
Average
- -
FACETIME
PRIORITY 1 FAULTS
-
Number of General Bridge Inspections
Number of Special Bridge Inspections 372
435 448
150
- 100% - 35%
ROADWORKS PROGRAMME
BRIDGES
Physical % of Roadworks Programme Completed 100% 24%
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
APSE
Average MONTHLY PERFORMANCE INDICATORS
53 28
7 25
98%
AYRSHIRE ROADS ALLIANCE
-
Comments
AYRSHIRE ROADS ALLIANCE
Comments
WELL ENGAGED
APSE
Average
ABSENCE MONITORING
AYRSHIRE ROADS ALLIANCE PERFORMANCE SCORECARD DETAILED MONITORING REPORT
UPDATE : JOINT COMMITTEE  -  2 SEPTEMBER 2022
AYRSHIRE ROADS ALLIANCE EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
Comments
STREET LIGHTING
FINANCE
ANNUAL PERFORMANCE INDICATORS
(CALENDAR YEAR)
ANNUAL PERFORMANCE INDICATORS                                                                                              
(FINANCIAL YEAR)
X0A1HX0A3HX0A4H
111

Page 112

Target Current
Status June Target Current
Status June Comments Target Current
Status June Target Current
Status June
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
MONTHLY PERFORMANCE INDICATORS APSE
Average 
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
APSE
Average MONTHLY PERFORMANCE INDICATORS
Comments
Number of Priority 1 Road Emergency defect repairs
made safe within 2 hours 4 1 Number of Street Lighting repairs completed within 7
working days 64 42
Number of Priority 1 Repair Lines issued 4 1 Number of Street Lighting Repair Lines Issued 66 42
% of Priority 1 Road Emergency defect repairs made
safe within 2 hours 100% 100% % Street Lighting repairs completed within 7 working
days 97% 100%
Number of Priority 2 Road Emergency defect repairs
made safe within 5 working days 5 5 Number of Traffic light repairs completed within 48
hours 19 12
Number of Priority 2 Repair Lines issued 6 7 Number of Traffic light repair lines issued 19 15
% of Carriageway Priority 2 Defects repaired within 5
working days 85% 71% % of Traffic light repairs completed within 48 hours 100% 80%
Number of Stage 1 Complaints responded to within
allotted timescales 1 - Number of enquiries responded to within allotted
timescales 80 23
Numer of Stage 1 Complaints received 1 0 Number of enquiries received 93 32
% of Stage 1 Complaints responded to within allotted
timescales 100% - % of enquiries responded to within allotted timescales 86% 72%
Number of Stage 2 complaints responded to within
allotted timescales - - 1
Number of Stage 2 complaints received 0 1 Number of FOI & EIR requests responded to within 20
working days 7 8
% of Stage 2 complaints responded to within allotted
timescales - 100% Number of FOI & EIR requests received 7 8
% of FOI & EIR requests responded to within 20
working days 100% 100%
Number of parking appeals accepted 37 41
Number of parking appeals received 66 117
% of parking appeals accepted 56% 35%
PARKING
- ----
100% 100%
PRIORITY 2 FAULTS
100%
76.23%
75%91.20%
50%
95%88.07%75%
50%
100%
88.23% 95% 95%
80%- 100%
ENQUIRIES
83.44% 80%
88.52% 100%
95%
FREEDOM OF INFORMATION
COMPLAINTS
One
complaint
took longer
to respond
to due to the
complexity
of the
complaint. 
Officers are
reminded of the
importance of
responding to
enquiries within
timescales
TRAFFIC
X0A0HX0A2HX0A5HX0A6H
X0A7H
112

Page 113

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
2 September 2022  
Report by the Head of Roads - Ayrshire Roads Alliance     
_________________________________________________________________ 
AYRSHIRE ROADS ALLIANCE
IMPROVEMENT ACTION PLAN
________________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this Report is to advise the Joint Committee on the management
of the Improvement Action Plan with the Ayrshire Roads Alliance. 
RECOMMENDATIONS 
2. It is recommended that the Joint Committee: 
i. Notes the Improvement Action Plan presented in this report; 
ii. Continues to receive updates on progress; and 
iii.  Otherwise, notes the content of the report.
BACKGROUND 
3. The purpose of the report is to provide regular updates on the Improvement
Action Plan.  This would ensure that the actions are monitored and scrutinised at
a minimum of a quarterly basis and is contained in Appendix 1. 
MAIN REPORT/MAIN ISSUES 
This Improvement Action Plan is collated by the Business Support Manager
and used to: 
• monitor the progress in meeting the Ayrshire Roads Alliance’s
objectives;
• help managers to continually review the actions and progress to date;
and 
• identify any risk / problem areas that need addressed regarding the
Improvement Action Plan. 
POLICY/COMMUNITY PLAN IMPLICATIONS 
4. A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire. 
Agenda Item 10
113

Page 114

5. The matters referred to in this report contribute to South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’. 
LEGAL IMPLICATIONS 
6. The Risk Register is a management tool and this will not replace the existing
statutory returns for risk and performance related information. 
HUMAN RESOURCES IMPLICATIONS 
7. The Risk Register has no direct impact on human resources. 
EQUALITY IMPACT IMPLICATIONS 
8. The Risk Register complements the Equality Impact Assessment by ensuring
that any issues arising are adequately prioritised, managed and either eliminated
or mitigated. 
FINANCIAL IMPLICATIONS 
9. The Risk Register facilitates the existing scrutiny arrangements to manage,
prioritise, and review the budget provided by East Ayrshire Council and South
Ayrshire Council to the Ayrshire Roads Alliance. 
RISK IMPLICATIONS 
10. The Risk Register assists in the prioritisation of risks that need to be mitigated
by the Ayrshire Roads Alliance in order to reduce the overall risk to either Council
and to comply with the Community Plan/Council Plan in both partner bodies.  
TRANSFORMATION STRATEGY 
14. This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
• “Maximum value for our communities”, by ensuring the various elements
of the Ayrshire Roads Alliance improves transport provision across both
networks. 
Kevin Braidwood
Head of Roads – Ayrshire Roads Alliance
19 August 2022 
114

Page 115

BACKGROUND PAPERS 
Ayrshire Roads Alliance Service Plan 2022/23 
LIST OF APPENDICES 
1. Ayrshire Roads Alliance Action Plan 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
115

Page 116

AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2022/23 – SEPTEMBER UPDATE 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
1 Continue to use the integrated
Roads Asset Management
Plan across the Ayrshire
Roads Alliance. 
There is one Asset Plan for the
Service delivering a risk based
approach for full service
delivery 
Head of Service March 2023.  SCOTS RAMP Project.  Development work
has been extended with staff attending various
external workshops to progress this work.   
2 Continue to prepare details for
developing an integrated Local
Transport Strategy. 
A Strategy covering both
Council areas, which will
involve consultation with
stakeholders.  Information will
be gathered to inform the
future Local Transport
Strategy.   
Continue to contribute to the
Scottish National Transport
Strategy, Regional Transport
Strategy and Strategic
Transport Projects Review
work. 
Head of Service  March 2023 The Regional Transport Strategy, through
SPT, has just commenced on which the
Alliance has Board membership.  The Local
Strategy will be created as an appendix to the 
Draft RTS when this is published in June 
2022
3 Action the Flood Risk
Management Plan 
Complete schemes and
undertake studies.  Inform the
next national cycle of potential
flood risk management
schemes beyond 2022. 
Head of Service  January 2023 Continue with construction of new Cumnock
Phase 2.  Continue design work on the Irvine
Valley Work.  Continue with flood study works
for the River Ayr, River Doon and in Girvan. 
Continue to engage with SEPA with the final
document due for publication Autumn 2022
with reports brought to committees within East
and South Ayrshire. 
116

Page 117

Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
4 Improve the condition of the
road network. 
Improve annual roads survey
results which are part of the
SRMCS work.  Ensure the
Alliance undertakes more
proactive maintenance. 
Head of Service Site works will be
undertaken
throughout
2022/23.
Key dependencies are the Road Improvement
Plans approved by the relevant Committees in
East Ayrshire and South Ayrshire in spring
2022.  Progress is provided to members, and
relevant Committees. 
5 Ensure the road network
remains safe through raising
awareness and improving road
safety through education,
engineering and enforcement. 
Reduce road accidents in line
with government targets. 
Provide appropriate traffic
management schemes and
initiatives.
Strategic Manager
Roads and
Transportation 
March 2023 Scottish Government and SCOTS guidance is
used.  A key dependency is the Road
Improvement Plans which are presented to
Cabinet and Leadership each year. 
6 Improve the condition of the
bridge stock. 
Improve bridge condition index. 
Reduce the number of weight
restricted bridges.  Complete
all general, special and
principal bridge inspections.   
Design &
Environment
Manager
March 2023 Through the Road Asset Management Plan. 
Key dependencies are Road Improvement
programmes approved by Committees in East
Ayrshire and South Ayrshire in spring 2022.   
Deliver the capital and revenue programmes. 
7 Manage and improve the
street lighting asset and install
energy efficient lighting
schemes. 
Maintain high standard of fixing
dark street lights.  Complete
the LED lighting replacement
programme in both East
Ayrshire and South Ayrshire. 
Head of Service October 2023 Through the Road Asset Management Plan,
with additional funding being provided to
commence the LED programme. 
At present performance is 82% of streets
lights are now LED in EAC; and 98% in SAC.
On target for completion within timescales. 
8 Maximise and deliver
externally funded sources of
work 
Identify external funding
sources and deliver work on
time and on budget.  Improve
infrastructure; and contribute to
improving the condition of the
network. 
Head of Service Works will be
undertaken
throughout the
2022/23.
External sources, including Timber Transport,
SUSTRANS, SPT - Regional Transport
Partnership, CWSS - Cycling Walking and
Safer Streets. Scottish Government Bridge
Fund.SFT
117

Page 118

Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
9 Implementation of Parking
Strategy
Develop Head of Service Works will be
undertaken
through 2022/23
Amendments to TRO’s, lining, signing and
residential parking permits and implementing
an improved process using digital technology.
10 Prepare Service Plan  Publish  Head of Service  Annual  East Ayrshire Council Community Plan. South
Ayrshire - Local Outcomes Improvement Plan
and Local Place Plans.  Draft Plan to be
submitted to Joint Committee in December
2022. 
11 Continue to review insurance
costs and insurance issues. 
Review current practices to
minimise insurance costs. 
Head of Service Complete Ayrshire Roads Alliance Monthly Insurance
Report. 
There is good dialogue with the Risk &
Insurance to ensure our work improves the
number of repudiated claims.  The number of
claims has greatly reduced due to the
implementation of the new Code of Practice. 
12 Review Depots and
Accommodation 
Continue to review in 2022/23
from initial work was completed
in 2017 as a result of amended
working practices.  
Head of Service March 2023 Joint Committee Reports of November 2016.  
Although initial work has been completed we
continue to strive to make depot and
accommodation cost savings. Further work
will continue on this as a result of COVID and
the return to office space during 2022/23. 
13 Review vehicle and plant costs Continue to review in 2021/22
from initial work that was
completed in 2017. 
Head of Service  March 2023 Joint Committee Reports of June 2016 
The service continues to review fleet
requirements with the most recent
improvement being on the management of
vehicle utilisation, electric vehicles and
Telematics.
118

Page 119

Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
14 Monitor and exercise Business
Continuity Plans
Improved resilience.  Business Support
Manager
Review and
update following
relevant local and
national events. 
Existing East Ayrshire and South Ayrshire
Council plans 
15 Continue to use the Roads
Costing System to its full
potential. 
Improve service performance
from both an on-site and
financial perspective. 
Business Support
Manager
August  2022 Revised roads costing system was fully
operational from November 2018. 
The system continues to be used to monitor
performance and work is ongoing to
implement digital timesheets linked to the
Roads Costing System. 
16 Support and contribute to the
Ayrshire Growth Deal 
Transport Summit has taken
place and outcomes are
included in the National
Transport Strategy, Regional
Transport Strategy and the
Strategic Transport Projects
Review.   
Head of Service October  2022 The Transport Appraisal being led by
Transport Scotland commenced in January
2019.  We continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review 2 work. 
17 Regional Transport Strategy Successfully contribute to the
preparation of this work being
led by SPT.  The Alliance has
Board representation. 
Head of Service June  2022
Complete
October 2022
SPT documents and existing Regional
Transport Strategy 
the draft RTS was  published June 2022.ARA
will respond to the consultation by the
deadline of October 2022 
18 Regional Transport Appraisal Ensure the various projects
identified as part of this work
are included in the Strategic
Transport Projects Review.  
Head of Service October 2022 Transport Scotland documents 
Work is on-going with the completion date for
the STPR2 of October 2022.
119

Page 120

Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
19 National Transport Strategy East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure the
sustainable transport hierarchy
and sustainable investment
hierarchy are delivered.  
Head of Service October 2023 In recognition of the anticipated increase in
Active Travel work, it is proposed that a
member of staff is dedicated directly to this
work. 
20 National Transport Strategy –
review of Governance 
East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
needs of the road
users/communities in both
Council areas.
Head of Service March 2023 National Transport Strategy 
21 Transport (Scotland) Bill -  East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure the work
provides the best outcome for
road users in both Council
areas.
Head of Service Complete Transport (Scotland) Bill received Royal
Assent 15 November 2019.
22 Transport (Scotland) Bill -  East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure a
pragmatic approach is taken in
delivering the pavement
parking ban in both Council
areas.
Head of Service March 2023 Transport (Scotland) Bill and Transport
Scotland Parking Standards working group
still awaiting guidance from Transport
Scotland.
23 Levelling Up Fund East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
needs of the road
users/communities 
Head of Service Complete Levelling Up Fund bids will be submitted June
2022.
120

Page 121

East Ayrshire Council Strategic Priorities 2022/23 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details
1 Progress and complete the
New Cumnock Flood
Protection Project 
Complete the flood prevention
projects at the Leggate and
beside the Afton Water. 
Head of Service November 2022 East Ayrshire Council and Scottish Government
funding.  The Leggat stage of the works was
completed in August 2018 with the Afton Water
phase commenced May 2021 with an 18 month
contract duration
2 Develop Projects approved
from the Flood Risk
Management Plan  
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022. 
Head of Service October  2022 East Ayrshire Council and Scottish Government
Funding.  Continue with work on studies for the
Irvine Valley, Dalrymple, Catrine and
Dalmellington through the financial year.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth
concerns.  Contribute to
infrastructure projects which are
being developed through the
Regional Transport Appraisal
work being led by Transport
Scotland. 
Head of Service October  2022 The all Ayrshire Transport Appraisal being led
by Transport Scotland commenced in January
2019. We will continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review work.
4 Transformation 
Strategy 2 
Continue to provide a high
quality roads service within
decreasing available budgets. 
Includes service re-design work.
Head of Service Complete East Ayrshire Council reports to various
Committees. 
Work commenced and was completed by March
2022 including a full revision of ARA structure.
5 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network and East Ayrshire
Network
Head of Service Complete  A full review of active travel provision in East
Ayrshire has been undertaken and this will be
presented to the relevant East Ayrshire Council
Committee Summer 2022.
121

Page 122

Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details
6 EV Strategy  Develop EV strategy across
East Ayrshire Network
Head of Service August 2022  A full review of EV provision in East Ayrshire has
been undertaken at present and this will be
presented to the relevant East Ayrshire Council
Committee with further work being carried out in
partnership with Scottish Futures Trust to
assess public charging funding models.
7 Levelling Up Fund Completion and Submission of
Bid for improvements to Bellfield
Interchange
Head of Service Complete Design and modelling work to improve Bellfield
to increase capacity and open up [development
opportunities.
8 Ash Die back Strategy Develop a risk based strategy
for the management of Ash Die
Back.
Head of Service August 2022 Develop a risk based approach to the
management of Ash Die Back.
122

Page 123

South Ayrshire Council Strategic Priorities 2022/23 
Action  Success Criteria/
Desired Outcome 
Responsible  Timescale  Details
1 Implementation of car parking
strategy for South Ayrshire. 
Complete this work with
improved parking provision and
management. 
Head of Service  Complete A full review of car parking provision in South
Ayrshire is being undertaken at present and this
will be presented to the relevant South Ayrshire
Council Committee. 
2 Develop Projects approved
from the Flood Risk
Management Plan  
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022. 
Head of Service October 2022 Flood study work in the Girvan area is
progressing and a report will be presented to the
relevant South Ayrshire Council Committee.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth
concerns.  Contribute to
infrastructure projects which are
being developed through the
Regional Transport Appraisal
work being led by Transport
Scotland. 
Head of Service October 2022 The all Ayrshire Transport Appraisal being led
by Transport Scotland commenced in January
2019. We will continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review work.
4 20mph speed restrictions in
villages
Progress with the 20mph speed
restrictions in all villages. 
Maintain engagement with the
local communities. 
Head of Service March 2022 phase
1&2 Complete 
March 2023 
phase 3
Completed phase 1 and 2.
Design work and consultation phase 3 
5 Anticipated Budget Reductions
in 2022/23
Continue to provide a high
quality roads service within
decreasing available budgets.
Includes service re-design work. 
Head of Service March 2023 Reports to various Committees. 
123

Page 124

Action  Success Criteria/
Desired Outcome 
Responsible  Timescale  Details
6 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network
Head of Service Complete A full review of active travel provision in South
Ayrshire has been undertaken and was
presented to Leadership Panel. Strategy to be
published.
7 EV Charging Strategy  Develop further the  EV strategy
for South Ayrshire Network
Head of Service August 2022 A full review of EV provision in South Ayrshire
was being undertaken and approved by
Leadership Panel. This will be reviewed as a
result of work with Scottish Futures Trust to
assess public charging funding models.
8 Levelling Up Fund Submission of Active Travel bid Head of Service  Complete Joint bid with NAC for active travel route Ayr to
Irvine
9 Levelling Up Fund Submission of A70 Improvement
Package
Head of Service Complete Bid submission for Active Travel Prestwick to
Ayr.
10 Motorhome Trials Develop Campervan sites along
the coastline.
Head of Service March 2023 Formalisation of two temporary sites at Girvan
and Ayr and additional trials at Ballantrae,
Maidens, Prestwick and Troon.
11 Strategic Economic Impact
Assessment A75/A77
There is a growing desire to
understand the importance /
effectiveness of the
improvements outlined along the
A75 and A77.
Head of Service July 2022 Public consultation / survey covering
communities throughout Ayrshire (North, South
and East) and Dumfries & Galloway is currently
being undertaken. To date there has been
approximately 600 responses, with more
responses expected as the survey is promoted
on social media and the radio. Final report
complete for reporting July 2022. 
124