AYRSHIRE SHARED SERVICES JOINT COMMITTEE 
2 SEPTEMBER 2022 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: PROCEDURE RELATING TO THE INSPECTION OF AYR SOUTH
PIER 
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this Report is to advise the Joint Committee on the proposed
procedure relating to the inspection of Ayr South Pier. 
RECOMMENDATIONS 
2. It is recommended that the Joint Committee: 
(i) Agrees the proposed procedure regarding Ayr South Pier. 
(ii) Otherwise, notes the content of this report. 
BACKGROUND 
3. The British Transport Docks Board sold Ayr South Pier in 1971 to the Royal
Burgh of Ayr for £33,000. 
4. Disposition documents detail the legal agreement and the responsibilities of
both parties in relation to the disposition including that the Royal Burgh of Ayr
are responsible for maintenance. 
5. As a result of The Local Government Act 1973, Strathclyde Regional Council
was created in 1975 and they assumed responsibility for maintenance of
piers, harbours and slips as dictated by the legislation. 
6. Within The Local Government Act 1982 a differentiation was made between
marine structures that had a transport, fishery or commercial function and
those which generally fulfil a leisure orientated function with Ayr South Pier
being classed as the latter. At this time SRC officers were instructed by senior
management to enter into disposal of leisure orientated marine structures to
District Councils or other interested parties. 
7. SRC and Kyle and Carrick District Council entered into discussions regarding
the disposal of the asset with Kyle and Carrick refusing to take
ownership.SRC retained maintenance responsibility for the pier.

Page 2

8. In 1996 the responsibilities for Kyle and Carrick and Strathclyde Regional
Council transferred to the unitary authority South Ayrshire Council. 
9. The Ayr South Pier currently sits within Ayr Common Good and Ayrshire
Roads Alliance current responsibility is to inspect the supporting structure only
and advise South Ayrshire Council of any defects and carry out repairs under
instruction. 
10. An insurance claim was raised by a pedestrian who tripped on a surface
defect on the pier deck, this raised the issue of inspection which was brought
to the attention of South Ayrshire Council in 2017 by Ayrshire Roads Alliance
following correspondence with a former ward member, but was never acted
upon by the administrators of the Ayr Common Good. 
DETAIL 
6. Following discussion with South Ayrshire Council, the Head of Ayrshire Roads
Alliance agreed to take responsibility for all inspections and prioritise
maintenance works which will be communicated to South Ayrshire Council
Asset Management Team for formally instructing and to ensure this is
recharged to Ayr Common Good. 
7. The procedure relating to the inspection of Ayr South Pier is contained in
Appendix 1 and details the following;  
• Responsibilities/ownership
• Lifebuoy Inspections
• Walking Surfaces and Fencing
• Sub-Structure Inspection
• Underwater Dive Survey
• Special Emergency Inspections
• Records Keeping 
POLICY/COMMUNITY PLAN IMPLICATIONS 
18. None. 
LEGAL IMPLICATIONS 
19. There are no legal implications. 
HUMAN RESOURCES IMPLICATIONS 
20. The inspection of the pier will be absorbed within existing resources. 
EQUALITY IMPACT IMPLICATIONS 
21. None 
FINANCIAL IMPLICATIONS

Page 3

22. South Ayrshire Council Asset Management Place Directorate are responsible
for funding and instructing repairs by Ayrshire Roads Alliance. 
RISK IMPLICATIONS 
23. Failure to have a robust inspection and maintenance regime of the pier may
result in further claims for injury. 
TRANSFORMATION STRATEGY   
24. None 
BACKGROUND PAPERS
None
LIST OF APPENDICES 
Appendix 1 – Procedure Relating to the Inspection of Ayr South Pier 
Kevin Braidwood
Head of Roads - Ayrshire Roads Alliance
08 August 2022 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads
Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org

Page 4

No embedded text on this page.

Page 5

No embedded text on this page.

Page 6

No embedded text on this page.

Page 7

No embedded text on this page.

Page 8

No embedded text on this page.

Page 9

No embedded text on this page.

Page 10

No embedded text on this page.

Page 11

No embedded text on this page.

Page 12

No embedded text on this page.

Page 13

No embedded text on this page.

Page 14

No embedded text on this page.

Page 15

No embedded text on this page.

Page 16

No embedded text on this page.

Page 17

No embedded text on this page.

Page 18

No embedded text on this page.