AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
2 SEPTEMBER 2022 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: ROADWORKS PROGRAMME 2022/23
______________________________________________________________ 
PURPOSE OF REPORT 
1. The purpose of this report is to advise the Joint Committee on the progress of
work through the roads improvement programmes within East Ayrshire and
South Ayrshire for financial year 2022-2023. 
RECOMMENDATIONS 
2. It is recommended that Joint Committee: 
(i) Notes the Ayrshire Roads Alliance works completed 2022/23,
(ii) Otherwise, notes the contents of this Report. 
BACKGROUND 
3. The budget allocation for East and South Ayrshire Councils Roads Investment
Programme for FY 2022/23 can be seen in tables 1 and 2 below respectively. 
Programme Area Budget (£m)
Carriageway Resurfacing 5.125
Footway Resurfacing 0.250
Street Lighting 0.230
Traffic & Road Safety 0.315
Structures (Bridges & Culverts) 3.000
Cycling, Walking & Safer Routes 0.778
Smarter Choices, Smarter Places 0.172
Sustrans 0.100
SPT  2.270
SFT 0.060
Car Parks 1.583
School Streets 0.100
EV Charging 0.100
Other Works 0.080
Total 14.163 
Table 1: East Ayrshire Council Roads Investment Programme 2022/23

Page 2

Programme Area Budget (£m)
Carriageway & Footway Resurfacing 3.500
Structures (Bridges & Culverts) 0.840
Street Lighting 0.205
20mph Rural Villages 0.023
Traffic Signals 0.390
LED Replacement 0.232
Girvan Harbour 0.318
Slope Stabilisation 0.190
EV charging  0.100
Cycling, Walking & Safer Routes 0.718
Smarter Choices, Smarter Places 0.158
Sustrans 0.262
SFT 0.060
SPT 0.500
STTS 0.148
Total 7.664 
Table 2: South Ayrshire Council Roads Investment Programme 2022/23 
DETAIL 
4. The programmes for FY 22/23 are contained within Appendices One and Two. 
Resurfacing 
5. The roads improvement programmes for FY 22/23 commenced in April with
some early improvement works completed. Significant work is ongoing at this
time to design and programme this year’s works in tandem with managing our
teams and contractors in completing this work. 
7. As per previous years bids have been made for timber transport funding as part
of this year’s road improvement programme with a confirmed award for South
Ayrshire of £0.148m for two projects. No awards were made to East Ayrshire
despite bids for 3 projects. 
Street Lighting
8. In addition to the lighting improvement and LED replacement programmes
additional full lighting replacement works have been agreed in Prestwick and
Girvan to replace some older installations and align with the appropriate BS5489
/EN 13201 lighting categories. 
9. Long delay in procuring lighting columns - earliest delivery for 8m cols expected
September. Contractors are also experiencing this issue. Post covid lockdown
issue 
Electric Vehicle Infrastructure

Page 3

10. The electric vehicle charging infrastructure programme has been included within
Appendix One and Two for South and East Ayrshire respectively, with the
number of public chargers installed to date is included at Appendix 3. Work has
been ongoing with SFT and Transport Scotland to explore public/private
partnerships for public charging network.£120k has been awarded to ARA to
develop a private public strategy with a draft to be submitted to SFT/TS by
September 2022 on approval from both authorities. 
11. EV @ New Cumnock Swimming Pool Commissioned 16 Aug 2022
Faulty New Cumnock charger – agreed that pillar will be replaced (funding
identified). Date to be confirmed. 
Structures 
12. Many of the bridge projects that we undertake require works to be undertaken
within the watercourse and depending on what the works involve we often require
a licence to be obtained. SEPA has 4 months to determine a licence application
and they usually take this time. Other constraints, such as fish spawning season
can also restrict when you can work in the watercourse. There are a number of
projects where a CAR application is ready for submission but the inability to
submit it to SEPA is likely to mean the project will incur delay. Where possible
other projects that do not require a CAR Licence will be brought forward. 
13. Land acquisition and/or access agreements are often required for bridge related
projects and can cause delay to the projects. A number of projects are currently
near tender ready but are being delayed due to land related issues. ARA are
actively working with the Council’s Estates and Legal teams in all of these
projects but land acquisition can be a very challenging and resource intense
activity. Again, where possible, projects that do not require land acquisition or
formal legal access agreements will be brought forward. 
14. ARA hold a seat on the Coastal Adaptation Budget Group. Form and guidance
for Coastal Councils to apply for a share of the £550,000 for 2022/23 was
significantly progressed at the most recent budget group meeting. 
Traffic & Transportation 
15. Agreement has been reached where necessary to roll grant funding provision
into the new financial year to complete projects. The focus of these projects will
continue to be improvements to our roads and infrastructure to improve journeys
and increase safety measures where required. The Active Travel Strategy for
East Ayrshire is complete and was presented to Cabinet on 15th June 2022
stakeholder re-engagement commenced – completion 30 Sept – to allow for
school holidays .This followed a similar approach to the Active Travel Strategy
development for South Ayrshire approved by South Ayrshire Council 8th  March
2022.

Page 4

16. Road Safety Improvement Fund Cross boundary bid for £400,000 in total, with
proposals including the installation of school gateway features at 10 schools (5
x EAC, 5 x SAC) along with installation of antiskid surfacing at problem locations 
17. ARA have submitted a change control bid for an additional £30k to SCSP to cover
costs of Hub website development – this has now been approved. 
18. 36K awarded for 20mph assessment. 
19. Hurlford Road, Riccarton  scheme progressing – order in force 2 Sept 2022 
POLICY/COMMUNITY PLANNING ISSUES 
20.  A well -maintained road network will contribute to achieving the Community 
Plan objectives in relation to Economy & Skills and Safer Communities to
maintain good access to our communities within East Ayrshire. 
21.  The matters referred to in this report contribute to the South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome of ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’ 
LEGAL IMPLICATIONS 
22.  By virtue of the relevant statutory provisions, principally detailed within the Roads
(Scotland) Act 1984, the Council as local roads authority is required to manage
and maintain all publicly adopted roads within its area other than those which are
maintained and managed by the Scottish Ministers. 
HUMAN RESOURCES IMPLICATIONS 
23.  The work programmes have direct impact on human resources and the Alliance
will ensure all works are suitably resourced to maintain  satisfactory progress. 
EQUALITY IMPACT IMPLICATIONS 
24.  An equality impact assessment is not needed because the proposal does not
have a differential impact on any of the protected characteristics. 
FINANCIAL IMPLICATIONS 
25. The Ayrshire Roads Alliance will deliver the strategic and local services as stated
in the Service Plan. The budget is provided by East Ayrshire Council, South
Ayrshire Council, and other external organisations. Appropriate scrutiny
arrangements are in place to manage these budgets.

Page 5

RISK IMPLICATIONS 
26.  The Ayrshire Roads Alliance Risk Register is reviewed and presented to very 
Joint Committee. 
27.  The Works Programmes, Service Plan and the Risk Register do not expose
either Council to an increased risk as they have been developed from existing
budgets and existing service commitment. 
TRANSFORMATION STRATEGY 
28.  This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
Maximum value for our communities; by ensuring the road network is maintained. 
BACKGROUND PAPERS 
East Ayrshire Council Cabinet Report – 2022/23 Roads Asset Management
Plan – Investment and Programme - 16 March 2022 
South Ayrshire Council Leadership Report Road Improvement Plan 2022/23 -
08 March 2022   
LIST OF APPENDICES 
Appendix 1 - South Ayrshire Council Programme of Works 2022/23 
Appendix 2 - East Ayrshire Council Programme of Works 2022/23 
Appendix 3 – EV Infrastructure 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation Officer:Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org

Page 6

No embedded text on this page.

Page 7

Appendix 1 - South Ayrshire Council- Ayrshire Roads Alliance
Carriageway Structural Maintenance Capital Programme over two years 2022/24 
Works Carried Over From 2021 
Route
No
Town Road Name Works
Description
Scheme
Score
Estimated
Cost
Comments Variance
+/-
Uncl Ayr Sannox View Full Length N/A £76,230 Complete Final
Measure
Uncl Ayr Viewfield Road Full length N/A £58,905 Complete Final
Measure
Uncl Ayr Hunters Avenue T Lights to
Northfield
N/A £129,150 Complete  Final
Measure
Uncl Prestwick Kyle Street  Full length N/A £54,180 Complete Final
Measure
Uncl Ayr Dalmilling Drive   Full length N/A £71,904 Complete Final
Measure
Uncl Ayr Taylor Street Full Length N/A £109,141 Complete Final
Measure
Uncl Ayr Carrick Avenue Full Length N/A £100,947 Complete Final
Measure
Uncl Ayr St Phillans Avenue Full Length N/A £222,755 Complete Final
Measure
Uncl Ayr Southpark Road Full Length +
fway works?
N/A £125,364 Complete Final
Measure
A719 By Maybole Maidens Ayr North of
Humeston
N/A £98,572 Complete Final
Measure
B734 Old Dailly Barr Old Dailly Old Dailly to
Penkill +
N/A £108,000 Complete Final
Measure

Page 8

drainage
improvements
B7035 By Girvan Glendoune Houdston
Road (Coalpots)
Braetoll South
+ S Power
shut down
N/A £100,500 Complete Final
Measure
Uncl Dailly Back Road Full Length N/A £107,646 Complete Final
Measure
Uncl Girvan Carrick Street Full Length N/A £44,499 Complete Final
Measure
Uncl Ayr Kersepark Footway Full length
one side
N/A £41,250 Complete Final
Measure
Uncl Ayr Arthur Street Footway Full N/A £26,186 programmed Final
Measure
B7023 Crosshill King Street
Footway
Shop side full
length
N/A £27,364 programmed 
C31 Crosshill Kirkmichael Road
Footway
By
Community
Centre
N/A £8,250 programmed 
Uncl Girvan Hawthorn Drive
Footway 
N/A £57,112 programmed 
Surface Dressing Works –Proposed 2023/24 
U72 By
Dundonald
Crooks Full Length N/A   
U99 By
Symington
Dundonald Symington C32 to U98
Corraith
N/A   
C115 By Tarbolton Parkmill Road Parkmill to
C114
N/A   
C114 By Tarbolton Largie Road 2 sections N/A   
B744 By Tarbolton Tarbolton/Crosshands C114 to
Auchinweet
N/A

Page 9

C74 By Ayr Macnairston Road Macnairston
to Lochfergus
N/A   
C122 By Minishant School Road Full Length N/A   
C60 By Maybole Ladycross Full Length N/A   
C39 By Ayr Corton Road A77 to
Equestrian
Centre
N/A   
C29 By Maybole North Water of Girvan
- Maybole Road
30 mph
Maybole
south to U3
N/A   
U2 By Maybole Auchencross C29 to
Railway
Bridge
N/A   
U25 By Dailly Delamford B741 to
Hadyard Hill
N/A   
U56 Girvan Golf Course Road Newton
Kennedy Br.
to
Knockvalley
Cottages
N/A   
C102 By
Kirkoswald
Balvaird  Full Length N/A   
Carriageway Resurfacing Works 2022/24 
A719 By Tarbolton Failtoll Crossroads By Lilylaw
Farm
N/A £173,875 Complete Final
Measure
A759 Dundonald Bypass Road,
Dundonald
Auchans to
Palmer Mount
61 £219,000 Complete Final
Measure
B730 By
Symington
B730
Tarbolton/Dundonald
Dankeith to
B751
Junction
53 £158,763 Complete Final
Measure

Page 10

B730 By
Dundonald
B730 Bogend/A77(T)
- Tarbolton
Road/Dundonald,
Dundonald
Slough Bridge
to Tarbolton
Road
Dundonald
53 £265,500 Complete Final
Measure
C92(C8) By Craigie Plewlands Road Full Length
incl part C8 to
A719
47 £139,040 programmed 
Uncl Troon Queens Drive Full Length 42 £35,640 programmed 
B744 By Tarbolton B744 Garden
Street/Tarbolton -
Council Boundary,
Tarbolton
From
Barrmuirhill
east to
Auchinweet
69 £159,000 Complete Final
Measure
B743 By
Mossblown
Ayr / Mossblown? West from
Brocklehill
Farm
53 £271,250 programmed 
C115 By Tarbolton C115 Montgomerie
Street/Tarbolton -
C114 Jcn Sw Of
Barhill, Mauchline
From Fail
Bridge
westwards
50 £123,200 programmed 
C37 Auchincruive Barrackhall Gibbsyard TBC 48 £134,400 programmed 
Uncl Ayr Saltpans Road North from
Glebe Road
46 £48,750 programmed 
Uncl Tarbolton Springfield Road Garden Street
to No 50
46 £35,200 programmed 
Uncl Prestwick Morris Road Full Road 43 £34,320 programmed 
Uncl Ayr Green Street Waggon
Road to
Crown Street
42 £67,760 programmed 
Uncl Prestwick Craigie Street Full length 39 £11,638 programmed 
C74 By Ayr Macnairston Road C105 to B742
Junction
52 £92,960 programmed

Page 11

B744 By Annbank B744 Jcn At B742 N
Of Annbank - B743,
Annbank
from B743
junction
south-
westwards
63 £120,000 Complete Final
Measure
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
By Holebogs,
S bend
59 £45,000 programmed 
B742 By Coylton B742 Council
Boundary -
A70/Hillhead, Coylton
From A70 at
Hillhead
south to C21
Craigs Road
junction
56 £57,000 programmed 
B744 Annbank Weston Avenue Craighall Way
to 101
Weston
Avenue
56 £70,875 programmed 
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
From
Meadowhead
Depot
entrance
south-wards
55 £97,500 programmed 
B744 Annbank Weston Brae Full Length 53 £58,125 programmed 
B744 Annbank Browns Crescent Full Length 53 £28,125 programmed 
B742 By Coylton B742 A70 Hillhead -
B744 Jcn N Of
Annbank, Coylton
Bridge of
Coyle to C2
52 £190,500 programmed 
B744 By Annbank B744 Belston/A70 -
Weston
Avenue/Annbank, Ayr
Auchincruive
Junction to
Glenview
52 £91,250 programmed 
U77 By Coylton Hole Road Full Length 46 £43,360 programmed 
Uncl Ayr Ellisland Square Full Length 42 £58,806 programmed 
Uncl Ayr Chapel Park Road Full Length 40 £53,319 programmed

Page 12

B742 By Maybole B742 Jcn Of A77(T)
Ne Of Maybole -
Council Boundary S
Of Dalrymple,
Maybole
From B7045
junction
westwards
N/A £66,845 programmed 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
By Humeston,
Castlehill
woods to
Pennyglen
70 £93,800 programmed 
A719 By Dunure A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
Cemetery to
Drumshang
67 £182,000 programmed 
A719 By Maidens A719
Pennyglen/B7023 -
Kirkoswald
Road/Maidens,
Maidens
Morriston
Farm to Jct
Blawearie
56 £186,000 programmed 
A719 By Maidens A719 Turnberry
Road/Maidens -
Maidens
Road/Maidens,
Turnberry
Maidens to
Turnberry
56 £232,500 programmed 
B7023 Maybole Crosshill Road Full Length 56 £56,250 programmed 
B7023 Maybole St Cuthbert's Road Full Length 53 £28,125 programmed 
B7024 Maybole Alloway Road Redbrae to
Bypass
51 £71,250 programmed 
C122 By Maybole C122 Gardenrose
Path/Maybole -
School
Road/Minishant,
Maybole
School to new
Bypass
50 £18,150 programmed

Page 13

C122 By Maybole C122 Gardenrose
Path/Maybole -
School
Road/Minishant,
Maybole
Ladycross to
new Bypass
50 £24,192 programmed 
B7023 Maybole Crosshill Road Full Length 56 £56,250 programmed 
B7023 Maybole Maybole Crosshill 30mph
Maybole to
jcn C58
72 £323,840 programmed 
A714 Barrhill Main Street  Full Length 61 £148,800 programmed 
B7027 Barrhill Knowe road Jcn A714 to
Dusk mill
area.
58 £53,808 programmed 
B741 Dailly Girvan/Dailly Bargany  55 £105,840 programmed 
C29 Maybole North Water of
Girvan/Maybole Road
Wallacetown
to Ruglen
various
locations
55 £136,125 programmed 
U52 Pinwherry Muck road Various TBC 52 £76,800 programmed 
C45 Ballantrae Heronsford Road A77- Laggan 48 £56,840 programmed 
U6 By
Ballantrae
Balkissock Full length 44 £101,482 programmed 
Footway Resurfacing Works 2022/24 
Uncl Troon Fullarton Drive  No 19 to No
37
30 £16,500 programmed 
B730 Dundonald Drybridge Road Bowling
Green to
Kilnford Dr
28 £14,500 programmed

Page 14

B730 Dundonald Drybridge Road Kilnford Drive
to A759
28 £33,600 programmed 
C492 Troon Bentinck Drive No 97 to No
121
28 £20,000 programmed 
Uncl Prestwick Outdale Avenue F/path
Sherwood
Road side ,
both sides
30 £38,300 programmed 
C17 Tarbolton Westport Footway
North side
28 £17,370 programmed 
B743 Mossblown Mauchline Road Fourways to
Railway
Bridge North
side
28 £15,300 programmed 
Uncl Ayr Content Avenue South Side
full length
(College
Side)
28 £8,400 programmed 
Uncl Mossblown Martin Avenue  28 £15,300 programmed 
Uncl Prestwick Hunters Avenue South from
Heathfield
Road, west
side
23 £7,500 programmed 
Uncl Ayr Bellevue Crescent  34 £37,800 programmed 
Uncl Ayr Hawthorn Drive  30 £62,000 programmed 
B742 Annbank Weston Brae  28 £10,700 programmed 
Uncl Maidens Ardlochan Road  30 £20,000 programmed 
Uncl Maybole Hicks Avenue No 2 to No 94 30 £28,980 programmed 
Uncl Maybole Queens Terrace No 17 to No
39 + cway
28 £18,000 programmed

Page 15

see separate
entry
Uncl Maybole Kingcraig Avenue No 2 to No 32
+ cway see
separate
entry
28 £22,800 programmed 
Uncl Ayr Lochpark slab
replacement
23 £20,425 programmed 
C151 Dailly Woodside Both sides
from Back St
and Hadyard
Terr
30 £20,400 programmed 
Uncl Dailly Church Crescent Odd number
side full
length
30 £16,000 programmed 
Uncl Crosshill Newton Street Church Side
of road
30 £15,795 programmed 
Uncl Dailly Hadyard Terrace Inside
footway +
part outer
section
28 £54,400 programmed 
TOTAL  £6,928,827 
South Ayrshire Council- Ayrshire Roads Alliance
Lighting Programme 2022/23 
Town Location Work Type No of
columns
Estimated
Programme
Cost
Comments Variance
+/-

Page 16

Ayr James Street and Area Carry forward from
2021/22 30 £62k On Site 
Ayr
Auchendoon Crescent
and various Service
Roads
No existing lighting 7 £17k
programmed 
Ayr Dalmilling Road (Phase
2) 5th Core supplies 9 £15k programmed 
Ayr Sannox Road & Place
(Phase 2) 5th Core supplies 8 £20k programmed 
Maybole Greenside (Phase 2) Concrete columns 9 £20k programmed 
Prestwick Mossbank
Old steel columns and
5th Core supplies
(ongoing section
faults)
24 £50k
On site 
Troon
Barassiebank Lane
(part), 
Muir Dr and Wallace Dr
Concrete columns 14 £30k
Complete  Final
Measure    
£214k   
South Ayrshire Council- Ayrshire Roads Alliance
LED Lighting Programme 2022/23 
Town Description Remaining
Ayr - 192

Page 17

South Ayrshire Council- Ayrshire Roads Alliance
Traffic and Transportation Programme 2022/23 
Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/- 
SPT £39,000 Match 
£500,000
Access for All
Review Coylton  
£400,000 Match Alloway to Burton
Construction
Tender
Evaluation 
£11,000
Match Dundonald to
Barrasie Link Ph1
Construction
Design 
£50,000 No
Match
SQP Various
Projects
Design 
Sustrans –
Places for
Everyone 
£120,000 Match 
£262,543
Access for All
Review Coylton
Uncertainty
Over Sustrans
Bid 22/23 
£100,000 Match Alloway to Burton
Construction
Uncertainty
Over Sustrans
Bid 22/23 
£42,543 Match Dundonald to
Barrasie Link Ph1
Construction
Uncertainty
Over Sustrans
Bid 22/23 
£0.00 No
Match  £0.00
Loans to Troon
Railway Station
New Bid
depending on
outcome of
consultation/
public event 
Sustrans –
Cycle
£10,000 Direct
Match 
£10,000
School Cycle
Shelters

Page 18

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
Shelter
Fund
SCSP £158,150 Hub
Match 
£158,150
Active Travel Hub
Ayr
Website Design 
SAC in Kind £0.00 - Active Travel Hub
Ayr  
CWSR £41,000 Match 
£491,000
Access for All
Review Coylton  
£250,000 Match Alloway to Burton
Construction
Tender
evaluation 
£40,000 Match Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
£50,000 Match Dundonald to
Barrasie Link Ph1
Construction
Scheme Design 
£10,000 Direct
Match
School Cycle
Shelters  
CWSR £20,000 Hub
Match 
HUB Match
Station Rd
Dunure  
£20,000 Hub
Match
Hub Match -TBC  
£20,000 Hub
Match
Hub Match -TBC  
£20,000 Hub
Match
Hub Match -TBC

Page 19

Calculated
Funding
Totals 
Sub-Bid Match
Detail
Total Bids Project
Description
Comments Variance +/-
£20,000 Hub
Match
£100,000 Hub Match -TBC        
Developer
Contribution  £130,000 Match 
£130,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
Total £1,551,693   
ARA New
Signals £230,000 Match 
£200,000
Signalisation
B746  Kilmarnock
Rd/Lang
Rd/Commonwealt
h Dr Junction
On Site 
Total £1,751,693   
South Ayrshire Council-Ayrshire Roads Alliance 
Traffic and Transportation Signal Replacement 2022/23 
Signal
No Town  Description  Work
Type
Estimated Programmed
Cost 
Comments Variance
+/-
SAS 15 Ayr
Castlehill
Rd/Chalmers
Rd
Junction
Replacement £60,000
Design 
SA59 Ayr
Whitletts
Road/Craigie
Rd
Junction
Replacement £50,000
Design

Page 20

SA17 Ayr
Whitletts
Rd/Mainholm
Rd
Junction
Replacement £45,000
Design 
SAP1 Ayr Holmston Rd
Pedestrian
Crossing
Replacement
£35,000
Design 
Total    £190,000   
South Ayrshire Council - Ayrshire Roads Alliance
Structures Capital Programme 2022/23 
Description   Work Type Estimated
Programme Cost 
Comments Variance
+/-
A79-30 Victoria Bridge Joint Replacement and
waterproofing
£300,000 On Site 
A79-30 Victoria Bridge Concrete Repairs and Painting £490,571 On site 
£790,571

Page 21

No embedded text on this page.

Page 22

Appendix 2 East Ayrshire Carriageway Structural Maintenance Programme 2022/23 
ROAD LOCATION Estimated Cost Comment
A713 South of Hollybush £168,750.00 On Site
A713 Polnessan to Patna £150,000.00 Complete
A71 Main Street Darvel £121,875.00 Programmed
A70 Lugar Water Bridge to East Gateway £131,250.00 Complete 
A70 Carbello £103,125.00 Complete 
A719 Moscow £131,250.00 Complete
A719 Rural Sections £131,250.00 Complete
A735 U26 to past C7 Junction £159,375.00 Programmed
B743 Strathaven Road Muirkirk 950m to South Lanarkshire Boundary £98,800.00 Programmed
B7036 Barony Road Near Egger factory Entrance £93,750.00 Programmed
C134 Rural Sections £51,200.00 Programmed
C50 Ochiltree Various sections £89,600.00 On Site
C6 Stewarton Various sections £89,600.00 Programmed
C22 Coal Road From U730 to A70 £264,000.00 Programmed
C23 Rigg Road from U730 to Railway Bridge £88,000.00 Programmed
U730 Glenshamrock Road from B705 to C23 £240,000.00 Programmed
U1 GalstonMoor Road U56 to A71 £160,000.00 Programmed
U760 Dalcairnie Full Length £116,480.00 Programmed
U26 Dunlop Full Length £48,000.00 Programmed
U729 Glenmuir Road Logan Avenue to Loganhill Road £20,000.00 Programmed
Ellis Street Kilmarnock Full Length £16,800.00 Programmed
Howard Street Kilmarnock Full Length £71,400.00 Programmed
Seaford Street Kilmarnock Full Length £112,200.00 Programmed
Dundonald Road Kilmarnock Smillie Place to Seaford Street £123,200.00 Programmed
Witchknowe Road Kilmarnock New Street to Witchknowe Avenue £9,350.00 Programmed
Meiklewood Road Kilmarnock No1 to No 31 £28,050.00 Programmed
Shortlees Crescent Kilmarnock Rathlin Avenue to Shortlees Road £37,400.00 Programmed
Old Street Kilmarnock Academy Street to Campbell St £32,130.00 Programmed
Kinlock Road Kilmarnock Full Length £36,371.50 Programmed
Stoneyhill Avenue Kilmarnock Full Length £18,700.00 Programmed

Page 23

Turner Place Kilmarnock Full Length £27,200.00 Programmed
Craufurdland Road Kilmarnock No87 to No145 £20,400.00 Programmed
Old Mill Road kilmarnock Lawson Street to Saturrock Street £52,800.00 Programmed
Grassyards Road Kilmarnock Kennedy Drive to C10 £52,800.00 Programmed
Mansfield Road New Cumnock A76 to Top Corner/ Junction £255,200.00 Programmed
Loch View New Cumnock Full Length £32,725.00 Programmed
Mill of Shield Drongan B730 to Drumwhill Road £56,100.00 Complete
Glencraig Street Drongan Lane Crescent to Hannaston Avenue £37,400.00 Complete
Blaney Avenue Patna Full Length £28,050.00 Programmed
Wallace Street Galston B7037 to Cross £11,900.00 Programmed
Titchfield Street Galston Standalane to Orchrd Street £28,560.00 Complete
Maxwood Road Galston Various Sections £34,000.00 Programmed
Cessnock Road Hurlford Full Length £24,310.00 Complete
Craigie Road Hurlford Full Length £59,840.00 Complete
Blair Avenue Hurlford Full Length £88,825.00 Complete
Crougar Road Crookedholm Full Length £58,905.00 Programmed
Meadowside Crookedholm Full Length £6,375.00 Programmed
High Street Newmilns Full Length £38,250.00 Programmed
East Donnington Street Darvel Full Length £30,600.00 Programmed
Burn Road Darvel Various Sections £74,800.00 Programmed
Campbell Street Darvel Full Length £28,050.00 Programmed
Patterson Terrace Darvel Full Length £21,505.00 Programmed
Fleming Drive Stewarton Full Length £11,874.50 Programmed
Lothian Road Stewarton Full Length £46,750.00 Programmed
Victoria Way Stewarton Full Length £13,090.00 Programmed
Cutsburn Road Stewarton Full Length £74,800.00 Programmed
Irvine Road Kilmaurs Full Length £21,505.00 Programmed
Newmill Road Dunlop Full Length £76,500.00 Programmed
Middlefield Drive Muirkirk Full Length £14,450.00 Programmed
Poole Avenue Ochiltree Full Length £5,950.00 Programmed
Broom Cresent Ochiltree Remaining Length £12,750.00 Programmed
Douglas Brown Avenue Ochiltree Full Length £12,750.00 Programmed
Dalgleish Avenue Cumnock Full Length £26,350.00 Programmed
McLymont Court Cumnock Full Length £24,480.00 Programmed
Holland Crescent Cumnock Full Length £47,600.00 Programmed

Page 24

Appendix 2  East Ayrshire Footway Structural Maintenance Programme 2022/23 
Section Street Name Location Environment Footway
Material Length Average
Width Treatment Area Cost
New
Cumnock Loch View Full Length
Both Sides Residential Bituminous 300 2
New PCC
Kerbs,
reconstruct,
HRA
600 £22,800
Patna Blaney
Avenue
No12 to
Main Street Residential Bituminous 144 3.25
New PCC
Kerbs,
reconstruct,
HRA
468 £14,976
Dalmellington Broomknowe
No 33 to
Gateside
Road
Residential Bituminous 106 1.8
New PCC
Kerbs,
reconstruct,
HRA
191 £6,106
Tankard Car Park Cumnock Full Car Park £70,400.00 Programmed
Ayr Road Car Park Cumnock Full Car Park £79,200.00 Programmed
Elizabeth Crescent Cumnock Full Length £36,000.00 Complete
Gemmel Avenue Cumnock Full Length £25,200.00 Complete
C3 Barsminning Road Mauchline From Rail Bridge to U742 Mosshead
Road £17,820.00 Complete
Hughfield Road Mauchline Full Length £55,500.00 Programmed
Carrick View Mauchline Full Length £41,250.00 Programmed
Beechwood Road Mauchline Full Length £69,500.00 Programmed
Jean Armour Drive Mauchline Full Length £112,500.00 Programmed
Cairn Road Cumnock Various Sections £103,950.00 Complete
Park Crescent Dalmellington Full Length £62,370.00 Complete
Main Street Dalmellington Full Length £40,040.00 Programmed

Page 25

Ochiltree Broom
Crescent
No1 to
Gallowlee
Avenue
Residential Bituminous 215 1.8
New PCC
Kerbs,
reconstruct,
HRA
387 £12,384
Ochiltree Mill Street Coachhouse
to A70
Residential Bituminous 200 2 New PCC
Kerbs,
reconstruct,
HRA
400 £12,800
Kilmarnock  Riverbank
Place
No3 to No
19
Residential Bituminous 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Kilmarnock  Western
Road
Various
Sections
Residential PCC Slabs 970 2 New PCC
Kerbs,
reconstruct,
HRA
1940 £62,080
Kilmarnock  Sannox
Road 
No1 to No31  Residential Granolithic 140 2 New PCC
Kerbs,
reconstruct,
HRA
280 £8,960
Darvel Burn Road A71 to West
Donington
Street
Residential Granolithic 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Darvel Ranolcoup
Road
A71 to
Mair's Road
Residential Granolithic 50 1.8 New PCC
Kerbs,
reconstruct,
HRA
90 £2,880
Cumnock Hearth
Road/Hearth
Road
Car Rd to
Emry's
Avenue
Residential Bituminous 420 1.8 New PCC
Kerbs,
reconstruct,
HRA
756 £24,192
Auchinleck Barbieston
Road
Talbot Drive
to Church
Street
Residential Bituminous 320 1.8 New PCC
Kerbs,
reconstruct,
HRA
576 £18,432

Page 26

Kilmaurs Sunnyside B751 to
Yardside
Residential Bituminous 175 2 New PCC
Kerbs,
reconstruct,
HRA
350 £11,200
Stewarton Merrygreen
Place
Full Length
One Side
Residential Bituminous 450 1.8 New PCC
Kerbs,
reconstruct,
HRA
810 £25,920
Stewarton Holm Street One Section Residential Bituminous 40 2 New PCC
Kerbs,
reconstruct,
HRA
80 £2,560
Drongan Watson
Terrace
From Cul-
De- Sac to
Taiglum
Place
Residential Bituminous 70 1.8 New PCC
Kerbs,
reconstruct,
HRA
126 £4,032
Drongan Taiglum
Place
Watson
Terrace to
lane
Crescent
Residential Bituminous 75 1.8 New PCC
Kerbs,
reconstruct,
HRA
135 £4,320
Crosshouse Kilmarnock
Road
Playingfield
Road to
Gatehead
Road
Residential Bituminous 140 1.2 New PCC
Kerbs,
reconstruct,
HRA
168 £5,376                  
£245,930

Page 27

No embedded text on this page.

Page 28

APPENDIX 2: Environmental Improvement Programme 
Year Project Description of Works Benefit Estimated
Cost 
2020/21 Hayhill, by Drongan, Environmental
Improvement
Kerb, upgrade verge
and form parking bay
Improve environment in village
and road safety by formalising
parking area.  £15,000 
2021/22  Craigie Avenue, Kilmarnock Form Lay-by - street
parking bays
Improve environment and road
safety by reducing on street
parking problems.  £15,000 
Future Years Wellpark Crescent Kilmarnock, widen
road.
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000 
Future Years  Kilmarnock Rd Service Rd Crosshouse,
widen road. 
Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years Hillcrest, Bellsbank, Dalmellington
Parking Bays
Form 6 No Off-Street
parking bays
Improve environment and safety by
reducing on street parking
problems.  £15,000 
Future Years  North Hamilton Place Kilmarnock, parking
bays.  Additional Parking Area
Improve environment and road
safety by reducing on street
parking problems.  £8,000 
Future Years  Gateside Road, Galston, widen road. Re-kerb and widen over-
run grassed area
Improve environment and road
safety by reducing on street
parking problems.  £7,000

Page 29

Appendix 2 Street Lighting Works Programme 2022/23 
Lighting Capital Programme 2022/23 
Town Location Work Type Estimated
C/F Cost
Comments Variance +/-
Dalrymple Church Street Area Carry forward from
2021/22  On Site £45k Complete 
Kilmarnock  Lomond Road Area Carry forward from
2021/22 on Site £15k Complete 
Darvel Glen Cres and Hutchison
Dr
Carry forward from
2021/22 £45k 95%
Complete 
£105k        
Town Location Work Type Estimated
Programme
Cost
Comments Variance +/-
Hurlford
Sherwood Road, Liffnock
Avenue, Cessnock Ave,
Cessnock Drive,
Cessnock Rd
5th Core supplies and
concrete columns £90k On site 
Kilmarnock Ayr Road, Service Road 5th Core supplies and
concrete columns £30k Programmed 
Muirkirk
Pagan Walk, Stoneyhill
Avenue, Wardlaw Ave and
Hawkshaw Terrace
5th Core supplies and
concrete columns £70k On Site 
Dalrymple Barbieston Rd and Cedar
Terrace                                                    
5th Core supplies and
concrete columns £40k Programmed 
£214k

Page 30

LED Lighting Programme Update 2022/23 
Town Lantern
Amount Status Lantern
Tender
Delivery /
start
install
Install
complete
by
New Cumnock & Dalmellington 766 Complete   
Patna & Dalrymple 563 Complete   
Mauchline,Sorn & Catrine 957 Complete   
Ochiltree & Drongan 562 Complete   
Auchinleck & Cumnock 1535 95% complete   Mar-22
Irvine Valley (including Hurlford & Crookedholm) 1860 Complete   
Kilmarnock South (including Crosshouse,
Gatehead 
& Knockentiber)
2300 complete   Mar-22
Kilmarnock - North East 1135 Lightways Contractor – started Feb
2022
July-Aug
21 Dec-21 90%
Complete
Kilmarnock - North West 1850 95 July-Aug
21 Sep-21 On Site
Kilmarnock - Central 1400 On site   Aug-22
East Ayrshire - Decorative 350 1st stage in progress ( 30% complete),
2nd stage tender to be issued   Aug-22
Logan, Lugar, Cronberry & Muirkirk 390 Tender to be issued   Feb-23
Stewarton, Kilmaurs, Fenwick, Dunlop & Lugton 1420 Tender to be issued   Mar-23 
Current Status 
Programme completed conversions
to date
8,402 Replacement programme 78% complete
Overall LED units completed 13,986 LEDs now 82% of total EAC inventory 
LED Programme Funded Replacement Works

Page 31

During our design works for our LED conversions, we have identified a number of older installations in East Ayrshire where it is not practicable to simply
replace the existing discharge lighting with LED lanterns. Consequently we propose full lighting replacement projects for the following locations funded
from the LED replacement budget. 
Town Location Estimated
Cost
Fenwick
Glebe Terrace £20k
Mansheugh Road £35k
Skernieland Rd Area £30k
Galston Orchard Street £35k
Kilmarnock
Ellisland Drive Area £45k
Gibson Street, Stevenson Street, Carmel Avenue Area £110k
Glasgow Road, B7038 £70k
Greenan Road, Dunure Rd, Wilson Avenue, Melville St Area £120k
Samson Avenue and Linfern Avenue Area £95k
Woodstock Street Area £50k
Stewarton Clerkland Road Area £70k
Total £680k

Page 32

APPENDIX 2: Bridge and Culvert Strengthening Programme 
Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond 
Bridge Strengthening and Replacement   
U22/10  Burnfoot Bridge, near Darvel
Replacement – Near tender ready. Land
acquisition outstanding   £444,000 
C127/10  Low Ashyard Bridge
Infilling of bridge by Historical Railways Estate.
EAC part contribution  £5,000   £180,000 
U26/10
West Clerkland Bridge, near
Stewarton
Replacement – currently closed to traffic; near
tender ready.  CPO required to obtain land
acquisition. Construction likely to be in future
year programme 
£12,000   £300,000 
B730/10
Littlemill Bridge, near
Rankinston
Replacement - near tender ready; land
acquisition to be concluded; construction likely
to be in future year programme   £6,000  £720,000 
A71/280/C8
0
Mathews Burn Culvert, West
Donnington St, Darvel
Replace section of culvert below West
Donnington Street; design  on going and near
tender ready, land acquisition to be
concluded.
£5,000  £144,000 
B713  B713 Road Slip south of Sorn  Detailed design and construct sheet piled wall   £312,000 
B705  B705 Road Slip centre of Catrine  Detailed design   £18,000  £720,000 
B705  B705 Road Slip north of Catrine  Detailed design   £18,000  £360,000 
Various  Investigative works  Topographical surveys, paint surveys, etc   £6,000  £6,000 
C108/00/C4
4 Gateside Farm Culvert
Replacement with box culvert units –
contract awarded – start March 2022
Completion end of May   £102,000 
A735/130/C Gills Burn Culvert, Dunlop
Part deck replacement and Retaining Wall
Repairs - design in  2022/23 and  £10,000   £180,000

Page 33

58 construction in future year programme

Page 34

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of
Projects C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
U45/10 Kirkland Bridge, Springside
Replacement of boundary bridge - North Ayrshire
Council is lead authority. East Ayrshire Council
funding 50% in 2022/23
£54,000  
U751/10 Crossflats Bridge Replacement – design by consultant  £60,000  £390,000
U760/00/C9
3 Glenhead Culvert Replacement  £42,000 
U740/10 Barbieston Bridge Boundary Bridge Replacement – design by
consultant  £24,000 £600,000 
Cessnock Ave, Hurlford Retaining Wall replacement works on site.  £36,000 
U44/10 Bruntland Bridge Strengthen and refurbish  £24,000 £300,000 
Upgrade Works identified from inspections   
B705/10/C
91 Cowan Place Culvert, Catrine Masonry repairs/scour repairs  £24,000   
B705/20  Shellies Bridge, Catrine
Scour repairs; masonry training wall repairs and
culvert extension – Consultant appointed to
undertake design & works ongoing; land
acquisition  required. Construction in future year
programme 
£6,000   £144,000 
A71/300  Priestland Bridge
Retaining Wall strengthening – finalise design,
conclude land acquisition/servitude and
construct.Tender evaluation.  £120,000   
U764/10 Glenmuir Bridge Scour repairs £42,000  
A70/130/W
31 Thornwood Wall, Lugar
Replacement - Consultant appointed to
undertake design which is ongoing; land 
acquisition required. Construction in future year
programme
£6,000  £360,000 
Queens Crescent, Newmilns  Replace riverbank retaining wall.tender being
evaluated.
£325,000    
Galston to Newmilns Cyclepath  River realignment works – additional rock
armour works.Works Complete
£72,000

Page 35

B741 Coal Glen Embankment
Slip, near Dalmellington
Ground investigation complete. Consultant
finalizing design & tender package. Land
acquisition required. Construction potentially in
2022/23.
£24,000  £360,000

Page 36

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond      
A713/60/C6
1 Polnessan Upper Bridge
Extension of culvert. Design and land
acquisition in 2022/23. Construction in future
year programme.
£24,000  £180,000
C90/35/CG0
2 Cattle Grid
Replacement of cattle grid and bypass
improvement.. Tender ready. Est £30,000
Funded by WF developer   
A736/60/C8
4 Lochridge Culvert  Masonry and drainage repairs £60,000   
F/LUGA/10
Logan to Park Terrace Footbridge,
Lugar
Replacement of footbridge deck.on refurbished
abutments. Consultant design ongoing  £150,000 
B705/20/C6
8 Smithy’s Culvert, near Catrine Replace with box units - future year programme   £84,000
B741/40/C7
9
Polmathburn Bridge, near
Dalmellington
Replace damaged deck slabs - future year
programme   £90,000 
A71  Dundonald Rd Bridge
Refurbish –  replace expansion joints,
waterproofing, drainage, surfacing – design.
Construction in future year programme.  £36,000  £1,200,000 
A71  Riccarton Viaduct
Refurbish – paint, replace expansion joints,
waterproofing, drainage, surfacing – design.
Construction in future year programme.  £36,000  £1,440,000 
A71  River Irvine Bridge
Refurbish – paint, replace expansion joints,
waterproofing, drainage, surfacing - design.
Construction in future year programme.  £36,000  £2,040,000 
B741/50 Nith Lodge Bridge
Replacement. Appoint consultant for
design and construction in future year  £54,000   £480,000 
Annick Water, Stewarton
Replacement of collapsing gabion
training wall. Detailed design by
consultant and construction   £378,000 
U/LOGA/10 Old Lugar Bridge Strengthening, masonry repairs and
scour protection £300,000  
C129/30 Chapeltoun Bridge Masonry repairs, Parapet heightening
and scour protection 90% Complete. £120,000

Page 37

C85/10 Fenwick Bridge Masonry refurbishment £24,000  £150,000

Page 38

Structure
Reference
Structure Name Proposed Works Revised
Estimate
of Projects
C/F into
2022/23
Estimate
of new
projects
for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
B7036/10 Lugar Bridge, Ochiltree Major refurbishment – design in FY
2022/23, construction in future year  £24,000 £840,000
U720/20 Lane Burn Bridge Masonry refurbishment 90% Complete. £70,000  
U/KMCK/20 West Shaw Street Bridge Strengthen and Refurbishment   £600,000
C135/20 Avon Bridge Masonry and scour repairs  £36,000 
U736/10/C65 Sykeside Bridge Scour repair  £24,000 
U729/00/C64 Hayhiolm Bridge Masonry and Scour repairs  £36,000 
U729/00/C71  Barry Burn Culvert Masonry and Scour repairs  £36,000 
U730/00/C37 Culvert Masonry and Scour repairs  £36,000 
C36/10 Nith Bridge Masonry parapet rebuild and repairs to
commence end of August 2022  £60,000 £60,000
A70/100 Gatehouse Bridge Parapet heighten, scour repairs &
masonry repairs  £24,000 £180,000
A70/110/C46 Rose Burn Bridge Masonry and scour repairs  £24,000 £120,000 
Broomknowe Retaining Wall Design in 2022/23, construction in future
years  £24,000 £150,000
W/MUIR/20 Muirkirk Shops Retaining
Wall Design in 2022/23, construction in future years  £24,000 £150,000       
Parapet Upgrades     
A70/70  Burnock Bridge, Ochiltree  Parapet and other masonry repairs 
£216,000   
A713/90  Dunaskin Bridge, Waterside 
Widening to create footway and replace both
masonry parapets - design ongoing. 
£70,000   
A735/20  Victoria Bridge, Kilmarnock Site works ongoing re  replacement of
substandard vehicle parapets; deck expansion
joints and paint superstructure, waterproofing
and resurfacing.Works Substantially complete 
£570,000

Page 39

B743/80 Cleuch Bridge, Sorn Upgrade of parapets and install footway  £90,000

Page 40

Structure
Reference Structure Name Proposed Works
Revised
Estimate
of Projects
C/F into
2022/23
Estimate of
new
projects for
2022/23
Estimate
Future Years 
2023/2024 &
beyond
A713/70/C53 Drumgrange Bridge Upgrade of parapets, masonry repairs –
works ongoing £6,000  
C134/10 Ranoldcoup Bridge, Darvel  Masonry repairs and heighten parapets  £24,000  £240,000  £48,000
B769/40 Corsehill Mill Bridge Parapet replacement – design in FY 2021/22  £12,000 £150,000
B7082/10 Townhead Bridge Parapet replacement  £150,000 
B743/135/C5
0 Beacon Hill Culvert Headwall Repairs   £36,000
W/NCUMN/1
0 Burnside Retaining Wall Replacement £36,000  
U8/00/C8 Hendryton Burn Culvert Scour and masonry repairs works on site. £48,000         
Rail Incursion   
C23/10 Rigg Road Rail Bridge,
Cumnock Safety fencing - future year programme   £20,000       
Non ARA  Council Footbridges     
Various sites Design, investigation  £120,000 £120,000
F/HURL/10 Portland Brae Footbridge Load Assessment, paint and replace concrete
planks £230,000  
F/CATR/20 Institute Ave Footbridge, Catrine Refurbishment £72,000         
Principal Inspections     
Various Principal Inspections of bridge stock by
consultant and in-house staff  £216,000 
TOTAL £3,037,000 £3,000,000 £12,434,000

Page 41

TOTAL  (Estimated Carry Forward + new
allocation)
£6.037m

Page 42

APPENDIX 2: Traffic, Transportation and Road Safety Programmes 2022/23
(i) Road Safety Programme 
(ii) Safer Neighbourhoods 
Town Location Proposed Scheme
Mauchline Cowgate Traffic management review
Kilmarnock Prestwick Place, Fardalehill Traffic management 
Kilmarnock Sutherland Drive Traffic calming
Galston Cessnock Road at Bowling Club Pedestrian build-out
Town/Route Location Proposed Scheme
Hurlford A71/B7073 roundabout AIP junction assessment
Kilmarnock Hurlford Road 30mph speed limit extension
Auchinleck Barony Road Speed Limit extension and gateway improvements
Dalmellington High Main Street, Churchill, Knowehead Road safety improvements
B742 Dalrymple B742 gateway entrance to Dalrymple Enhanced gateway features including vehicle activated sign
B7034 Hollybush Hollybush 30mph speed limit
A713 Waterside Waterside 50mph speed limit
Auchinleck Various Waiting restriction amendments
Lugton Dunlop Road Speed limit signing improvements
Galston Brewland Street Extension of 30mph speed limit
Kilmarnock A71 Campbell St off slip Signalisation assessment
Kilmarnock A71 West of Bellfield I/C Road safety signing
Stewarton Dunlop Road Pedestrian Refuge

Page 43

Mauchline Mansfield Road Traffic management review
Stewarton Various roads 20mph speed limit orders amendments
Kilmarnock Whatriggs Road 20mph speed limit amendments
Cumnock Glaisnock Road Possible speed reduction measures
Kilmarnock Foregate Square Permanent pedestrianisation scheme
Various Various locations Vehicle activated signs upgrade 
(iii) Rural Route Action Plans 
Route Proposed Scheme
B778 B778 Fenwick to Stewarton Route Study 
(iv) Cycling, Walking and Safer Streets (CWSS) 
Town Location Proposed Scheme
Crosshouse/Kilmarnock  B7038 Kilmarnock to Crosshouse  Cycle route between Fardalehill and Crosshouse via hospital
Crookedholm Grougar Road  Grougar Rd localised road widening and pedestrian crossing facility
Fenwick Kirkton Rd/Main St – Fenwick PS  Pedestrian improvements/school street investigation
Dunlop A735 Lugton Road Pedestrian crossing improvements
Dalrymple B742 Barbieston Road Traffic calming and pedestrian crossing facilities
Mauchline Loudoun Street Pedestrian crossing assessment
Kilmaurs Main Street Improved pedestrian facilities
Crosshouse Crosshouse-Dundonald Cycle route feasibility study
Cumnock Netherthird School Streets Project
Newmilns Loudoun Road Pedestrian Crossing Investigation
Crosshouse B751 Gatehead Road Pedestrian Crossing Installation
Kilmarnock Kilmaurs Rd at Hillhead PS Pedestrian Crossing Installation
Darvel East Main St/Murdoch Road Junction sightline improvement

Page 44

Various Various locations  Cycle and scooter parking at schools and other locations 
(v) Strathclyde Partnership for Transport (SPT) 
Location Project
Kilmarnock Phase 3 refurbishment of Kilmarnock bus station to upgrade concourse and stance areas.
Kilmarnock Glasgow Road bus park & ride 
Fenwick Footway improvements for access to X77 bus service 
(vi) SUSTRANS 
Location Project
Hurlford Hurlford Street Design Project
N/A East Ayrshire Active Travel Strategy

Page 45

Appendix 3 EV Chargers     
EAST AYRSHIRE PUBLIC CHARGERS      
CYC Ref Type Make Location Replacement Cost
51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £8,000
51210 22kw eVolt Foregate Car Park, James Shaw Crescent, Kilmarnock, KA1 1LU £9,000
50821 22kw eVolt Multi Storey Car Park, Kilmarnock, KA1 1LU £9,000
51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH £9,000
52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £9,000
52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU £30,000
52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB £30,000
52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB £8,000
51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £9,000
52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU £8,000
52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £8,000
52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ £30,000
50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW £9,000
51170 Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £30,000
50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP £9,000
50815 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR £30,000
52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU £30,000
52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE £30,000
52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG £30,000

Page 46

52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS £9,000
52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB £30,000
52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY £8,000
51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £9,000
52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL £8,000
52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ £8,000
52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB £9,000
52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ £8,000
52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ £8,000
52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH £8,000
52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY £9,000
52962 Rapid eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £30,000
52963 22kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU £9,000
53080 7kw eVolt Netherthird Community Centre, 65 Ryderston Drive, Cumnock, KA18 3AR £8,000
53778 Rapid eVolt Main Street Car Park, Muirkirk £30,000
53775 22kw eVolt Rose Reilly Sports Centre, Stewarton £9,000
53776 7kw eVolt Standalane Car Park, Stewarton £8,000
60786 7kW eVolt Academy Street, Hurlford £8,000
Awaiting commissioning  22kW eVolt Drongan Centre car park, Mill of Shield Road £9,000
Awaiting commissioning  22kW eVolt Carnshalloch Avenue car park, Patna £9,000
Awaiting commissioning  22kW eVolt New Cumnock Outdoor Swimming Pool car park £9,000
Awaiting commissioning  22kW eVolt Gatehead Road car park, Crosshouse £9,000
Awaiting commissioning  7kW eVolt Queen Street car park, Kilmarnock £8,000
Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000

Page 47

Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting commissioning  7kW eVolt Morton Place car park, Kilmarnock £8,000
Awaiting programme of
works 7kW eVolt Brown's Road car park, Newmilns £8,000     
EAST AYRSHIRE FLEET CHARGERS      
CYC Ref Type Man. Location £9,000
52043 22kw eVolt Transport Depot, Crookedholm £8,000
52044 7kw eVolt Transport Depot, Crookedholm £8,000
52045 7kw eVolt Transport Depot, Crookedholm £8,000
52046 22kw eVolt Cleansing Depot, Western Road, Kilmarnock £9,000
52047 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
52048 7kw eVolt Cleansing Depot, Western Road, Kilmarnock £8,000
51897 7kw eVolt Holmquarry House, Kilmarnock £8,000
51914 7kw eVolt Holmquarry House, Kilmarnock £8,000
51881 7kw eVolt Croft Street, Kilmarnock £8,000
51882 7kw eVolt Croft Street, Kilmarnock £8,000
51883 7kw eVolt Croft Street, Kilmarnock £8,000
52964 Rapid eVolt Croft Street, Kilmarnock £30,000
52950 7kw eVolt Strand Street, Kilmarnock £8,000
52951 7kw eVolt Strand Street, Kilmarnock £8,000
52952 7kw eVolt Strand Street, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Holmquarry House, Kilmarnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting commissioning 7kw eVolt Ayr Road Council Depot, Cumnock £8,000
Awaiting programme of
works 22kW eVolt Croft Street, Kilmarnock £9,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000
Awaiting programme of
works 7kW eVolt New Cumnock Community Hospital car park £8,000

Page 48

SOUTH AYRSHIRE CHARGERS        
CYC Ref Type Make Location  
51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW £8,000
51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU £8,000
51535 Rapid eVolt Burns Statue Square, Ayr, KA7 UT £30,000
52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN £9,000
52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT £8,000
51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY £9,000
50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £9,000
50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ £9,000
50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF £9,000
52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG £9,000
50816 Rapid eVolt Girvan Harbour, Girvan, KA26 9AG £30,000
52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR £9,000
52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH £30,000
52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU £30,000
52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE £8,000
52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE £30,000
52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £8,000
53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW £30,000
52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL £30,000
53774 Rapid eVolt Academy Street, Troon £30,000
53773 Rapid eVolt Lodge Road Car Park, Turnberry £30,000
53777 22kw eVolt Burnside Road, Monkton £9,000
Awaiting commissioning 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly £9,000
Awaiting commissioning 22kw eVolt Inches Close car park, Maybole £9,000

Page 49

Awaiting commissioning 22kw eVolt Tarbolton Community Campus car park, Tarbolton £9,000
Awaiting commissioning 22kw eVolt Dundonald Primary School car park, Dundonald £9,000
Awaiting commissioning 22kw eVolt Mossblown Activity Centre car park, Mossblown £9,000
Awaiting commissioning 22kw eVolt Kirkoswald Main Street car park, Kirkoswald £9,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting commissioning 7kW eVolt Chalmers Arcade car park, Girvan £8,000
Awaiting programme of
works 22kW eVolt Barrhill Community car park, Main Street, Barrhill £9,000