THE AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
10 JUNE 2022 
Report by the Head of Roads - Ayrshire Roads Alliance 
AYRSHIRE ROADS ALLIANCE 
SERVICE PLAN 2022/23 
PURPOSE OF REPORT 
1 The purpose of this Report is to seek the Joint Committee approval for the Ayrshire
Roads Alliance Service Plan for 2022/23. 
RECOMMENDATIONS 
2 It is recommended that the Joint Committee: 
i. Approves the Ayrshire Roads Alliance Service Plan for 2022/23,
ii. Notes the confirmed finance budgets for 2022/23
iii. Notes the Performance Scorecard for 2021/22
iv. Requests that a six month progress update is provided to a future
meeting of the Joint Committee,
v. Otherwise, notes the content of this Report. 
MAIN REPORT/MAIN ISSUES 
3 The first Ayrshire Roads Alliance Service Plan for 2014/15 was approved by Joint
Committee on 23 May 2014.  As part of all Service Plans it was agreed that the draft
Service Plan is approved prior to submission to both East Ayrshire Council and
South Ayrshire Council. 
4 The service plan included in Appendix One provides detail on the current operating
position of the Ayrshire Roads Alliance and indicates the position where the Service
will be by March 2023.   
Details are provided for the activities to be undertaken to achieve these goals
through: 
• the Transformation and Redesign Plan; 
• the Performance Management Framework as approved and updated at every
Joint Committee;  
• the Risk Register and Report which has established a method of effective
management of risk to ensure service improvement through better service
delivery; increased certainty and fewer surprises; more effective and efficient

Page 2

management of resources; reduced waste; and better management at all
levels through improved decision-making; and
• the Benefits Realisation Strategy and Plan which sets out how benefits will be
tracked and controlled across the fully integrated Roads service and which
was approved by the Joint Committee in on 1 May 2015. 
5 The Service Plan describes the challenges and the targets for the service. 
6 In addition to Revenue Budgets, the Ayrshire Roads Alliance receives budgets from
other sources including capital, and grants from the Scottish Government,
Strathclyde Partnership for Transport; and other locations including both external to
the Council and Council Departments. 
POLICY/COMMUNITY PLAN IMPLICATIONS 
8 A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain good
access to our communities within East Ayrshire. 
9 The matters referred to in this report contribute to Commitment 6 of the Council
Plan:A Better Place to Live Enhanced environment through social, cultural and
economic activities. 
LEGAL IMPLICATIONS 
10 The work of the Ayrshire Roads Alliance is undertaken in accordance with relevant
legislation. 
HUMAN RESOURCES IMPLICATIONS 
11 The Service Plan has no direct impact on human resources.  However, as the
Improvement Action Plan work develops, and reviews are completed, it is expected
that some impact on human resources will arise. 
EQUALITY IMPACT IMPLICATIONS 
12 The Risk Register complements the Equality Impact Assessment by ensuring that
any issues arising are adequately prioritised, managed and either eliminated or
mitigated.

Page 3

FINANCIAL IMPLICATIONS 
13 The Ayrshire Roads Alliance delivers the strategic and local services as stated in the
Service Plan.  The budget is provided by East Ayrshire Council, South Ayrshire
Council, and other external organisations.  Appropriate scrutiny arrangements are in
place to manage these budgets. 
RISK IMPLICATIONS 
14 The Risk Register assists in the prioritisation of risks that need to be mitigated by the
Ayrshire Roads Alliance in order to reduce the overall risk to either Council and to
comply with the Community Plan/Council Plan in both partner bodies. 
TRANSFORMATION STRATEGY 
15 This Report aligns with the following design principle stated in the
“Transformation Strategy 2017-2022”. 
• “Maximum value for our communities”, by ensuring the various elements of
the Transport (Scotland) Bill enacted will improve Transport provision
throughout East Ayrshire.
BACKGROUND PAPERS 
1 Benefits Realisation Strategy And Plan  - 1 May 2015 – Joint Committee 
LIST OF APPENDICES 
1 The Ayrshire Roads Alliance Service Plan - 2022/23 
2 Ayrshire Roads Alliance Performance Scorecard 2021/22 
Kevin Braidwood
Head of Roads - Ayrshire Roads Alliance 
14 May 2022 
Person to contact: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org 
Implementation officer: Kevin Braidwood, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: kevin.braidwood@ayrshireroadsalliance.org

Page 4

1
Service Plan 2022-2023
May 2022
A Partnership between East Ayrshire Council and South Ayrshire Council
Appendix 1

Page 5

2 
Table of Contents 
INTRODUCTION ............................................................................................................................................ 3
STRATEGIC CONTEXT .................................................................................................................................. 15
SERVICE PERFORMANCE FRAMEWORK ...................................................................................................... 16
RISK, OPPORTUNITIES and CHALLENGES .................................................................................................... 19
PROFILE OF SAVINGS AND COSTS OVER THE FIRST 10 YEARS .................................................................... 23
AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2021/22........................................................ 25
APPENDIX 1 – ORGANISATIONAL CHART ................................................................................................... 34
APPENDIX 2-STRATEGIC AND LOCAL DELIVERY SPLIT SPLIT……………………………………………………………………36

Page 6

3 
INTRODUCTION 
The Ayrshire Roads Alliance is a shared integrated roads and transportation service
which provides the roads service for East Ayrshire Council and South Ayrshire Council. 
The Service is delivered with the overall objective of improving the road and
transportation service in the East Ayrshire and South Ayrshire areas to move the
Ayrshire Roads Alliance to a position that will deliver at least £8.634 million of savings
by 2024.   
The Ayrshire Roads Alliance is governed by the Ayrshire Shared Service Joint
Committee.  The Joint Committee has responsibility for all shared Council services in
Ayrshire.   
The Shared Services Minute of Agreement describes the functions of the Joint
Committee as follows: 
• making decisions within the confines of the service budget, 
• developing and implementing a strategic policy framework,
• co-ordinating, monitoring and reviewing service performance,
• monitoring budget spend,
• considering and approving an annual Service Plan. 
In addition, the "Joint Committee Arrangements for the Ayrshire Roads Alliance"
document covers those issues that are specific to the Ayrshire Roads Alliance. 
The two Councils involved in the Ayrshire Roads Alliance have each appointed four
Elected Members to the Joint Committee.  Meetings take place as often as required to
conduct business, but at least twice per year in line with the terms of the Minute of
Agreement.   
The Alliance is responsible for all the roads and transportation activities listed in
Appendix 2, split between strategic and local delivery, that are the responsibility of East
Ayrshire Council and South Ayrshire Council.  Both Authorities retain the role of Roads
Authority under the Roads (Scotland) Act 1984 - Section 1.

Page 7

4 
East Ayrshire Council - Strategic Issues 
The East Ayrshire Community Plan is the sovereign and overarching planning
document for the East Ayrshire area, providing the strategic policy framework for the
delivery of public services by all local Partners.  The Plan is the Council’s Corporate
Plan and covers the 15 years from 2015 to 2030. 
The Vision contained within the Community Plan is shared by all Partners and states
that: 
“East Ayrshire is a place with strong, safe, vibrant communities where
everyone has a good quality of life and access to opportunities, choices
and high quality services which are sustainable, accessible and meet
people’s needs.”
The Community Plan is implemented through three thematic Delivery Plans -
Economy and Skills, Safer Communities and Wellbeing.  The Plan is also
implemented through the day to day work carried out by services across the
Council. 
Service Improvement Plans are an essential element of the Council’s performance
management and improvement framework.  They set out the key issues for
delivering services in support of the Community Plan Vision and priorities, provide a
focus on performance improvement aligned to the Single Outcome Agreement and
describe the service specific risks that may impact on the delivery of the Service. 
The diagram below provides a graphic representation of the Council’s Policy Planning
Framework and shows the strategic context within which the Service Improvement
Plans sit.  In addition it shows the wider Performance Management and Improvement
Framework which the Council has adopted to ensure the rigorous scrutiny of
performance and drive service improvement across the Council.

Page 8

5 
South Ayrshire Council - Strategic Issues 
The Council Plan 2018-2022 sets out the Council’s vision for the next four years, with a
focus on “Our People, Our Place”.  The Plan details the high-level objectives and
outcomes to be achieved by 2022. 
The Council strategic objectives are:
• Effective leadership that promotes fairness;
• Reduce poverty and disadvantage;
• Health and care systems that meet people’s needs;
• Make the most of the local economy;
• Increase the profile and reputation of South Ayrshire and the Council; and
• Enhanced environment through social, cultural and economic activities. 
The Council Plan is supported by Plans for the People and Place Directorates, as well
as the Health and Social Care Partnership which detail the proposed delivery
outcomes. 
These plans are the key documents which will provide the foundation to plan and
manage services over the next four years. 
There are a number of other key strategic documents that will inform the way forward
for the Council which include: 
South Ayrshire Profile Demographic, social and economic statistics for
the area. 
Programme for Effective
Governance 
Vision for the future direction of the Council.
Directorate Plans  Programming the delivery of the Council Plan
Council Financial Strategy Five year financial programme to achieve the
Council Plan. 
Council Asset Management Plan  Use of land and buildings deliver the Council
Plan
Corporate Workforce Plan Workforce planning aligned to business and
people strategies. 
Local Outcomes Improvement
Plan
Focused Community Planning Partnership
activity.

Page 9

6
The Council Plan commitments will be achieved through:
Culture Councillors, and staff ensuring a shared set of values that
complements the South Ayrshire Way behaviours of positive,
respectful and supportive, and underpins the work of the Council.
Governance Councillors being demonstrably able to carry out effectively their
governance and leadership functions, promoting fairness to all
both within the Council and across South Ayrshire.
Partnerships Effective partnership arrangements will reflect the Council’s
leadership role in community planning.
Locality planning Establishing arrangements that are clear to residents, effective in
their operation, well supported and responsive to community
aspirations, and are accountable to all partners.
Place making Councillors and officers working with communities to create local
place plans and setting local priorities, with progress monitored
and assessed.
Resources Ensuring that there is effective engagement, including with
communities to ensure that all annual budgeting, workforce
planning and capital programmes are targeted to achieve Council
Plan aspirations.
Service planning  Ensuring services work together to deliver Council Plan outcomes.
Structure  Ensuring services are structured to deliver Plan outcomes.
Systematic
review
Designing systems to eliminate duplication; streamline processes;
harness technology; improve online service access; and maximise
the potential of our assets and workforce.
Workforce
planning
Ensuring a stable and productive workforce, and improved staff
consultation outcomes through succession planning, identifiable
career paths, reviewed staff welfare provision, flexible work
patterns to suit individual, family and community circumstances.
Regulation Working within regulation to facilitate development, build fruitful
networks with business and communities and reach out to
residents.
Monitoring and
Evaluation
Providing progress reporting, that is meaningful and drives
improvement, based on meaningful baseline information and clear
measures of success.

Page 10

7 
The Ayrshire Regional Growth Deal 
The three Ayrshire Councils have worked in partnership with other agencies,
communities and businesses to secure the first Regional Growth Deal in Scotland.  This
will see £251.5 million of investment in key assets and key sectors across Ayrshire,
underpinned by an ambition to facilitate economic growth across the region.  The
projects within the Growth Deal offer the best opportunity to attract private sector
investment into Ayrshire and to transform the area.  It is considered that the various
interventions in the Growth Deal will unlock £300 million of private investment and
deliver around 7,000 new jobs across a wide range of sectors. 
The vision is for Ayrshire to be “a vibrant, outward looking, confident region,
attractive to investors and visitors, making a major contribution to Scotland’s
growth and local well-being, and leading the implementation of digital
technologies and the next generation of manufacturing.” 
Project proposals and associated outline business cases have been prepared,
reviewed, assessed and refined following feedback received from policy leads with the
United Kingdom and Scottish Government and these now form the overall programme
business case. 
The Heads of Terms for the Ayrshire Growth Deal were signed on 8 March 2019. 
Partners are now working with Governments to agree the profiling and phasing of
projects and the development of full business cases for those projects in 2020.   
The figure below illustrates how the Ayrshire Growth Deal programme links to the
Governments’ objectives of increased growth and prosperity.  The programme is based
on the achievement of economic growth and inclusive growth with a clear focus on
addressing the issues of innovation and productivity, and inequality across the regional
economy.

Page 11

8 
There are no transport projects within the current Ayrshire Growth Deal proposals
outwith the areas where development is proposed.  Connectivity and accessibility are
key tenets of the Deal, and transport infrastructure will be essential to securing
Ayrshire’s economic growth. 
Ayrshire Growth Deal - Transport Projects 
It is essential that businesses are connected to markets to make Ayrshire more
accessible to investors and visitors, and also to ensure communities are connected to
employment and training, which is critical overall to securing Ayrshire’s economic
growth.  Transport infrastructure will underpin the Growth Deal proposals and this has
been developed to support the proposals as specified in the project business cases. 
Ayrshire’s key transport routes (road, rail, sea and air) are critical for businesses to
enable goods to get to market, our communities to employment and for training
opportunities.  A number of key route improvements have been identified.   
Transport Scotland has agreed to undertake the Regional Transport Appraisal for the
Ayrshire Growth Deal area which commenced in early 2019.  This work will ensure the
appropriate consideration is given to the relevant Growth Deal projects.  This work is
part of the wider Strategic Transport Projects Review process in which named schemes
will be identified.  This will be beneficial to the Ayrshire area as it will confirm, the
important strategic nature of the various Ayrshire Growth Deal proposals. 
The current Strategic Transport Projects Review for the 20 year period from 2012 deals
with just road and rail modes of transport.  The new Strategic Transport Projects
Review to be published by October 2022 will include all modes of travel including active
travel and public transport.  In addition, this work will develop transport projects outputs
at a national, regional and local level. 
Due to Covid-19, Transport Scotland has restructured the STPR2 into two phases.
Phase 1 will focus on the short-term (up to 5 years) with a view to identifying
interventions which can be accelerated to support a green economic recovery from
Covid-19, and also those which embed, support and extend any increase in travel by
sustainable travel modes, including positive behaviour change seen during the
pandemic. Phase 2 will complete the review and report in autumn 2022, giving Scottish
Ministers a programme of potential transport investment opportunities for the period
2022-2042. 
Projects 
The projects will be developed from the Transport Appraisal process.  This work will
identify the specific infrastructure required to underpin the Growth Deal to ensure the
maximum economic benefit from investment is achieved.   At this stage the project list
is indicative and each will be assessed in line with the agreed objectives as part of the
Regional Transport Appraisal for the Growth Deal through transport appraisal work. 
• A70 Ayr to M74 link (East Ayrshire and South Ayrshire)
• A737 corridor improvement (North Ayrshire)
• A760 improvements (North Ayrshire)

Page 12

9 
• B741 Dalry to Saltcoats Link Road (North Ayrshire)
• A77/A77 Bellfield interchange (East Ayrshire)
• A77 Ayr bypass (South Ayrshire)
• A77 Maybole bypass (South Ayrshire) Complete 
• Prestwick Aerospace Park access link road (South Ayrshire)
• Glasgow Prestwick Airport station upgrade (South Ayrshire) 
• Glasgow to Carlisle (via Kilmarnock) rail upgrades (East Ayrshire)
• Ayrshire freight strategy (including ports) (All) 
Levelling Up Fund 
The Fund provides £4.8bn capital investment allocated through a competitive bid
process that will operate from 2021/22 through to 2024/25.  Total funding of £800m
from the quantum has been allocated to Scotland, Wales and Northern Ireland 
with Scotland guaranteed to receive at least 9% (£432m) of the overall UK total.  The
fund will be jointly managed by the Ministry of Housing, Communities and Local
Government (MHCLG), the Department for Transport (DfT) and HM Treasury 
The Fund will focus on capital investment and the Fund Prospectus, which was
published by the UK Government in March 2021, highlights that the first bidding round
will accept bids which focus on the following specific themes; Investment in Transport
Transport   investments - including (but not limited to) public transport, active  
travel,  bridge  repairs,  bus  priority  lanes,  local  road  improvements  and  major  
structural maintenance, and accessibility improvements.  The UK Government 
are requesting proposals for high-impact small, medium and by exception larger 
local  transport  schemes  to  reduce  carbon  emissions,  improve  air  quality,  cut  
congestion, support economic growth and improve the experience of transport 
users.   
Our Current Service Resources 
Table 1 – The Ayrshire Roads Alliance Assets (as at 31 March 2022) 
EAC SAC Total
Number of staff  200
Length of Carriageway (km) 1,218 1,175 2,393
Length of Footways (km) 1,022 940 1,962
Number of Streetlights  20,626 20,105 40,731
Number of Traffic Signals 83 81 164
Number of Council owned bridges 618 360 978
Number of privately owned bridges 115 199 314
Number of gullys 27,692 26,040 53,732
Length of retaining walls (km) 6.8 3.0 9.8
Length of sea defences (km) Nil 24 24
Piers and Harbours Nil 1 1
No of depots 1 2 3

Page 13

10 
Staff in the Ayrshire Roads Alliance 
Staff, Property and Fleet 
The Ayrshire Roads Alliance has depots located at Gauchalland in Galston;
Meadowhead in Coylton and Grangestone in Girvan.  Offices are located in Kilmarnock,
Ayr and at Girvan Harbour.  We also have extensive vehicles, plant and equipment to
allow our service to be delivered.   
There will be an ongoing need for property and accommodation across the area for the
Ayrshire Roads Alliance; for vehicle and equipment storage; and maintenance and staff
facilities.  It is important that property and accommodation is safe, secure, fit for
purpose, and strategically placed to minimise the time spent travelling from depot to
workplace to maintain the road asset, minimise the associated vehicle wear and tear,
and emissions. 
From April 2014, the following actions have been taken in relation to property and
accommodation: 
• Gauchalland Depot - Street lighting operations have moved from Munro Place in
Kilmarnock to Galston.
• The street lighting technical team is located at the Johnnie Walker Bond in
Kilmarnock which now provides a more centralised service.  This involved some
staff transferring from Burns House in Ayr.
• The closure of the Underwood Depot in Cumnock has seen staff re-located to the
Gauchalland Depot in Galston. 
Head
of Service
Strategic
Manager
Strategic  
Manager
• Traffic & Road Safety
• Transportation
• Roads & Structures
Design
• Environmental
• Asset Management
• Development Control
• Parking
• Roadworks Co-ordination
• Street Lighting Network
• Network East
• Network South
• Structural Road Maintenance
• Routine and Cyclic
Maintenance
• Winter & other Civil
Emergency Provision
• Piers and Harbours
• Support Services
• Finance
• IT support

Page 14

11
• All salt for the Ayrshire Roads Alliance previously stored in the Underwood Depot
is now distributed from the Meadowhead Depot in Coylton.
• A rationalisation of fleet across the Ayrshire Roads Alliance has taken place
resulting in a reduction in cost.
Further office developments include staff transferring from the Johnnie Walker Bond to
the Opera House in Kilmarnock and from Burns House to Wellington Square and Town
Hall in Ayr which was restricted due to COVID guidance. 
Staff have now returned to the Opera House Kilmarnock on a rota based model with
posts designated as fixed, flexible and mobile. 
Staff will return to County Buildings and Ayr Town Hall in June 2022 on a rota hybrid
model.
Depots at Galston, Ayr and Girvan were fully operational throughout the Pandemic and
continued to support other services with waste collection and food delivery.
Our key messages from this work include:
The Ayrshire Roads Alliance completed an organisational review which delivers the
current management structure which has generated £326,000 of revenue savings per
year.  This will contribute £2.242 million towards the Business Case savings target of
£8.634 million.  The Joint Committee agreed to this review on 1 April 2016, and the
work was completed during 2017/18.  In accordance with good management practice
the Alliance continued to review staff provision, and completed the service re-design
during 2021/22 with management actions realising a saving of £190,000,parking
£86,000 and £293,000 in South Ayrshire.
The Ayrshire Roads Alliance has completed a depot review which will result in
£404,362 of revenue savings by 2024.  This included the closure of the Underwood
Depot with staff transferring to Gauchalland Depot; and the Munro Place Street Lighting
Depot with all street lighting staff now being based in Gauchalland.  In accordance with
good management practice the Alliance will continue to review depot and
accommodation provision. 
The Ayrshire Roads Alliance has completed the fleet review which will result in
£1,350,699 of revenue savings by 2024.  In accordance with good management
practice the Alliance will continue to review fleet and plant provision. 
Budgets
The Ayrshire Roads Alliance delivers the strategic and local services as stated in this
Service Plan and listed in Appendix 2.  
The budget to deliver these services is provided from East Ayrshire Council, South
Ayrshire Council, and other external organisations. 
budgets for 2022/23 are confirmed and this is reflected in Tables 1 and 2.

Page 15

12 
Table 1 - Budgets 2022/23  
Council Revenue  Non - Revenue Total (£m)
East
Ayrshire
Council
£6,107,970 £16,023,632 £22,131,602
South
Ayrshire
Council 
£5,892,848 £8,127,238 £14,020,086
Total £12,000,818 £24,150,870 £36,151,688

Page 16

13
Table 2 provides the current non-revenue budgets for 2022/23
Table 2- Non-Revenue Budgets 
Funding Source Type/Level of Funding Annual Budget 2022/23
East Ayrshire Council
Carriageway, 
Footway 
Street Lighting.
Traffic, Transportation &
Road Safety. 
Bridges & Culvert
Replacement.
Other works 
Kilmarnock Car Parks
School Streets
EV Charging
£5.125m
£0.250m
£0.230m
£0.315m
£3.000m
£0.080m
£1.583m
£0.100m
£0.100m
Current approved budget
£12.803m at Cabinet
meeting of 16 March
2022.
Scottish Government Cycling Walking and Safer Streets.
Smarter Choices, Smarter Places.
Deliver the Local Flood Risk
Management Plan.
New Cumnock.  Grant funding
equivalent to 80% of scheme
estimate of £6.29 million.
£0.778m
£0.172m
£0.114m
Overall grant £2.020m
Total £3.084mm
Strathclyde Partnership
for Transport
General funding  £2,270,000 
Sustrans Projects £100,000
SFT Funding for Strategic Strategy for
Public charging
£0.060m TBC
Scottish Timber Transport
Group
Projects £0.000m
LED Street Lighting
Replacement 
LED Replacement £3.650m
Funding Source Type/Level of Funding Annual Budget 2022/23
South Ayrshire Council
Roads Improvement Plan
Bridge Works 
Street Lighting 
LED
20mph in Rural Villages
Traffic Signals
Girvan Harbour
Slope Stabilisation
EV Charging 
£3.500m
£0.840m
£0.205m
£0.232m
£0.023m
£0.390m
£0.318m
£0.190m
£0.100m
£6.100m (Confirmed at
Leadership meeting on 8
March 2022)
Scottish Government Cycling Walking and Safer Streets.
Smarter Choices, Smarter Places.
£0.718m
£0.158m

Page 17

14 
Deliver the Local Flood Risk
Management Plan. 
£0.173m 
Strathclyde Partnership
for Transport
General funding  £0.500m 
Sustrans Projects  £0.262m 
SFT Funding for Strategic Strategy for
Public charging 
£0.060m TBC
Scottish Timber
Transport Group
Projects £0.148m

Page 18

15 
STRATEGIC CONTEXT 
EAST AYRSHIRE COUNCIL 
The Community Plan 2015 - 2030 includes a Safer Communities Delivery Plan, which
sets out the key actions to be undertaken and also measures progress.  The Delivery
Plan contains three distinct strategic priorities, all of which will be influenced by the
activities undertaken by the Ayrshire Roads Alliance. These are: 
• Make East Ayrshire a safe, secure and attractive place to live, work and visit.
• Improve community safety in neighbourhoods and homes and protect and
support our most vulnerable individuals and families.
• Promote our vibrant communities by encouraging active and responsible
citizenship. 
Single Outcome Agreement (SOA)
The SOA was reviewed and developed as a key element of the comprehensive review
of the Community Plan to ensure alignment with strategic priorities and high level
local outcomes.  There are a number of National Outcomes which are supported by
the activities undertaken by the Ayrshire Roads Alliance.  The Community Planning
Partnership receives an annual report in September each year at which they are advised
of progress against the local outcomes previously agreed. 
SOUTH AYRSHIRE COUNCIL – 
The Local Outcomes Improvement Plan and Local Place Plans were introduced in
2017.  The plan focuses on two strategic themes which emerged from the development
process.  
• Closing the poverty-related outcomes gap for children and young people in 
South Ayrshire 
• Supporting older people to live in good health 
The Plan is supported by a partnership wide focus on four priority areas  
• Improving outcomes for looked after children and care leavers 
• Providing support for young people who are carers 
• Reducing social isolation and loneliness 
• Support for people living with dementia and their carers 
There will be an effort to improve outcomes for children and older people particularly in
the Ayr North and Girvan Glendoune areas, and to identify transferable good practice to
be used to support outcomes improvement in other parts of South Ayrshire.  The work
on progressing this work is taking place within the auspices of the Integrated Children’s
Services Strategic Delivery Partnerships and the Health and Social Care Partnership
and this is supported by appropriate partnership work.

Page 19

16 
SERVICE PERFORMANCE FRAMEWORK 
PERFORMANCE AND BENCHMARKING 
The Councils’ performance management frameworks operate on a number of
levels providing detail on strategic priorities, operational priorities and day to day
management information.  Within the Ayrshire Roads Alliance, the approach is fully
integrated and aligned with the corporate frameworks. 
• Strategic (Community Plan and Single Outcome Agreement; and Local
Outcomes Improvement Plan)
• Operational Priorities (Council performance indicators)
• Management information (operational statistics, corporate measures of
performance) 
Strategic Issues
East Ayrshire Community Plan 2015-30.  The Community Plan includes three
Delivery Plans, which set out the key actions to be undertaken and measures to
progress against them.  The Delivery  Plans  contains  distinct  strategic  priorities, 
which  will  be  influenced  by  the  activities undertaken by the Ayrshire Roads
Alliance Service. 
Single Outcome Agreement.  The single outcome agreement has been reviewed and
developed as a key element of the comprehensive review of the Community Plan in
2014/15 to ensure alignment with strategic priorities and high level local outcomes. 
Operational Issues
Council Performance Indicators.   
The Ayrshire Roads Alliance reports on a number of performance indicators through an
electronic Performance Management System.  A management framework has been
developed, which has been approved by the Joint Committee.  The data includes both
contextual and performance information thereby allowing statutory returns to be made
facilitate benchmarking provide each Council and the Joint Committee with the
information they require to monitor performance. 
A performance scorecard is produced as an integral part of the Ayrshire Roads Alliance
which is reviewed at the monthly Ayrshire Roads Alliance Management Team meetings
and reported to every Joint Committee. 
This scorecard is used to:
• monitor the progress in meeting the Ayrshire Roads Alliance’s objectives;
• help managers to have performance-related conversations with staff; 
• identify any problem areas that need addressed.

Page 20

17
Performance Management System
Relevant information contained within the Performance Management System is
provided for each four week period in a scorecard which is used by the Depute
Chief Executive (Safer Communities) and the Head of Service to monitor
performance activity and improvement within their respective management team
meetings.
SCOTS/APSE Benchmarking Framework
The Society of Chief Officers of Transportation in Scotland (SCOTS) and the
Association for Public Sector Excellence (APSE) have developed a series of indicators
to utilise SCOTS definitions using a single template. 
The Alliance participates in the SCOTS/APSE benchmarking framework through the
APSE Annual Return; the SCOTS/Institution of Civil Engineers “state of the network”
annual return; and the Scottish Road Maintenance Condition Survey.
Local Government Benchmarking Framework
The Local Government Benchmarking Framework (LGBF) collates information from
the APSE Annual Return that is published by the Improvement Service with specific
actions to improve performance. 
Monitoring and Review
Monitoring of the service plan is the responsibility of the Joint Committee.  An annual
review will be completed and reported to the Joint Committee and both Councils.  The
Joint Committee will receive a six monthly update on the Service Plan progress.  In
addition, separate monthly meetings are held with the Depute Chief Executive
responsible for the provision of the roads service within East Ayrshire Council; and the
Executive Director responsible for the provision of the roads service within South
Ayrshire Council. 
Scrutiny in respect of the Joint Committee is undertaken by both Councils in
accordance with their own processes as set out within their respective Corporate
Governance arrangements.  Matters in relation to service performance will be closely
monitored by both Councils through the Joint Committee.  
QUALITY MANAGEMENT AND ASSESSMENT
European Foundation for Quality Management (EFQM) Excellence Model
The European Foundation for Quality Management (EFQM) Excellence Model is a
practical self-assessment tool designed to promote continuous improvement within
organisations by assessing their performance against concepts of tested and
recognised good management practice.  The EFQM Model is the cornerstone of Best
Value.  The service also has an externally accredited Quality Management System.

Page 21

18 
ENGAGEMENT WITH SERVICE USERS 
The Ayrshire Roads Alliance will continue to undertake engagement with relevant
service users.  This engagement will take a number of forms through informing,
consulting, involving, collaborating or empowering our service users. 
Through 2022/23 we will continue engagement with our customers to ensure we
maximise the involvement of our service users. 
CONSULTATION WITH EMPLOYEES 
Employee Engagement 
The Employee Attitude Survey identified a number of issues to be addressed.  
Employee engagement will continue through 2021/22 and this will take many forms
including management meetings; team meetings and staff forums.  The staff forums will
take place when important Council or service information requires to be provided to
staff.  One of the main issues for 2021/22 was the transformation strategy for Ayrshire
Roads Alliance and implemented April 2022. 
Trade Union Meetings 
The Alliance will continue to engage with the Trade Unions through the established JCC
process which involves meetings at a Corporate; Service and work specific level.

Page 22

19 
RISK, OPPORTUNITIES and CHALLENGES 
Risk 
The Ayrshire Roads Alliance records risk using a “five by five” scoring matrix, for the
risks identified which quantifies the assessment of the likelihood and severity of a
particular risk occurring.  This information is hosted on the Performance Management
System and it is used to understand the impact of proposed controls and mitigations on
the overall risk profile.  This is a widely used tool in risk management.   
The service risk register, and the Corporate Risk Registers, are aligned to the approach
of identifying and recording risk, which ensures a consistent approach to service level
risk recording.  This allows service objectives and priorities, performance measures and
service risks to be captured in a single document.  These areas are closely aligned, and
this approach offers benefits in business planning, service delivery, and performance
and risk management. 
The risk register for the Ayrshire Roads Alliance is presented to every meeting of the
Joint Committee. 
There continues to be a number of opportunities and challenges which the Ayrshire
Roads Alliance faces over the next twelve months. 
Opportunities  
The opportunities include the following 
• Although the Organisational Review was approved by Joint Committee on 1 April
2016 and implemented during 2017/18, we continued to review staff provision
during 2020/21 as part of service re-design reported and approved by Cabinet 23
February 2022 the transformation and redesign was implemented from 1 April
2022. 
• The Plant & Fleet review from June 2016 was implemented immediately. 
However, with new technology and the need to increase the number of electric
vehicles then all plant and fleet will continue to be reviewed during 2022/23. 
• The property and accommodation review from November 2016 and all the
actions have been implemented.  Nevertheless, with more agile and remote
working, the Alliance will continue to review these issues during 2022/23, as part
of the service re-design. 
• The opportunity to continue to make significant revenue budget savings through
the replacement of existing street lighting units with LED units cannot be
understated.  Work commenced in 2018/19 with work programmed to be
completed in 2021/22, however completion has been delayed due to COVID and
the impact of material shortages...  It was expected that street lighting revenue
delivery cost would reduce by more than 50%, however, the current challenge

Page 23

20
against this, is the current rising energy costs as a result of wider economic
issues. 
• Use of Digital software to improve our gully, culvert, and harbour infrastructure
management
• The developing Ayrshire Growth Deal will allow the provision of strategic
transportation projects throughout the whole of Ayrshire with this work being
carried out by Transport Scotland as part of the Strategic Transport Projects
Review Regional Transport Appraisal work.
Challenges
There are a number of challenges the Ayrshire Roads Alliance will face in 2022/23
which include the following.
External
• There is the potential to increase the utilisation of electric cars and vans to
comply with emission standards and the Scottish Government decision to ensure
that all new cars and vans are not powered through fossil fuel means by 2030.
This will result in the reduction in harmful emissions, and an improvement to air
quality.
• The Transport (Scotland) Bill places increased emphasis on low emission zones;
smarter ticketing arrangements; the increased role and powers for the
Roadworks Commissioner; the ban on pavement and double parking; the
workplace parking levy and the ability for Councils to run public bus services.
• The National Transport Strategy will focus on sustainable, inclusive and
accessible transport systems to promote prosperity, health and fairness.  The
Sustainable Transport Hierarchy will be used to inform budgetary decisions
with walking first; then cycling; public transport; taxis and shared transport and
then the private car.  There is a need on many levels for more active travel and
public transport use across Scotland.  The Sustainable Investment Hierarchy
will be used to inform budgetary decisions – reduce the need to travel; maintain
existing assets; make better use of existing capacity; and finally targeted
infrastructure improvements.
• There continues the potential for re-organisation of roads services at a national
and local level.  The National Transport Strategy has identified the need to focus
on increased collaboration, and this was considered through the Roles and
Responsibilities Working Group which made recommendations to the Scottish
Ministers including that future transport governance arrangements should be on
the basis of some form of regional model allowing for variations in approach
between different geographic regions; and
• There is the potential for continuous increases in the unit costs of electricity due
to ‘green taxes’ and on-going energy costs.  The Department of Energy and
Climate Change has predicted that electricity prices are likely to double within the

Page 24

21 
next ten years. SCOTS reported a 20% increase in energy costs with a further
6% increase expected in 2022/23. 
• However, provided the programme for LED lights is completed then the impact of
this specific challenge may be reduced.   
• Ensure the current Regional Transport Appraisal work aligns with the needs of
East Ayrshire and South Ayrshire Council. 
• Rising costs of oil based products and construction materials as a result of
ongoing world issues with Bitumen and coated road stone increasing by 12%. 
• Rising costs and shortage of general construction materials, steel, and high
value electrical products. 
• Changes to the use of rebated fuel (Red Diesel) for construction plant will see an
increase in overall fuel costs. 
Internal
• There are increased austerity measures resulting in need to drive further
efficiency savings over and above the £8.634m identified in the Benefits
Realisation Strategy & Plan which was presented to Joint Committee on 1 May
2015. 
• The need to increase the level of mobile working across the Ayrshire Roads
Alliance workforce as a direct result of implementing the Roads Asset
Management Plan and the impact of COVID.  This has resulted in an increase in
mobile technology, full use of the WDM Roads Maintenance and Management
System, Artificial Intelligence and the decrease in the demand for desk and office
space. As a result of COVID many of the aforementioned have been accelerated
by the service in particular reduced desk space, mobile technology and the
implementation of Artificial Intelligence, training has been delivered on this
particular element for operational use from April 2022. 
• The rise in demand for electricity charging points as a direct result of the greater
number of electric vehicles and the Scottish Government initiative to ban the sale
of new fossil fuel powered cars and vans from 2030. 
• The impact of an ageing workforce and the need to ensure an appropriate
knowledge transfer and succession planning; and service re-design. Work
around this was carried out over 21/22 with a greater emphasis on the service
being more resilient with an amended structure to be more community focused
along with Modern Apprenticeships and trainee opportunities.

Page 25

22
Resilience
• Continue to engage with community councils and community groups to improve
local winter and flooding resilience.  This allows these groups to take ownership
of gritting the footpaths and minor roads; and attend minor flooding events and
report them directly to the Alliance for action.  The uptake to date has been
encouraging and risen to 160 groups. This resilience work was recognised by the
National Highways Industry in October 2021 and APSE in March 2022.
• Decreasing requirements for desk and office space due to the increase in
mobilisation of workforce from the developing Roads Asset Management Plan
using the WDM system and working patterns amended due to COVID will see an
increase in ‘hot desking’ and access to welfare facilities at key strategic locations
throughout the geographical area of the Ayrshire Roads Alliance, through service
re-design.
• Improved adverse weather resilience during periods of heavy rain, and severe
snow conditions.
• Ensuring improved resilience as a measure of our ability to successfully absorb
future  changes; to reshape ourselves; and a strategic capability to thrive.

Page 26

23 
PROFILE OF SAVINGS AND COSTS OVER THE FIRST 10 YEARS 
The Ayrshire Roads Alliance will achieve savings of £8.634 million by 2024.   
This represents a saving on the costs to deliver the service when comparing the first
year with later years.  Table 3 has been extracted from the Detailed Business Case,
and this shows the various costs/savings to be delivered.  The reason for the variations
in year one to year four is due to set up costs.  In practice, these set up costs may be
spread over a longer period to mitigate any operational risks.  This may impact on when
consequential savings are realised.   
Continual updates on progress and targets will be contained within the service plan,
and reported to the Joint Committee when required.   
This savings will enable Councils to take individual decisions, either to bank their share
of the savings, or to invest some or all in additional roads maintenance.   
Strategic Delivery Savings for each Council are now calculated by considering a
smaller group of core strategic delivery staff and that their costs are apportioned on a
budget spend profile basis, in line with local delivery budget spend plus the actual
capital expenditure in that specific year.   
Local Delivery Savings are pro rata to the existing budgets.   
Table 3 – Ayrshire Roads Alliance Total Revenue Savings 
Year
1
Year
2
Year
3
Year
4
Year
5
Year
6
Year
7
Year
8
Year
9
Year
10
Total 
14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 
Proposed
Savings (£m)  0.696 -0.426 -0.730 -1.049 -1.187 -1.188 -1.187 -1.188 -1.187 -1.188 -8.634
Savings to
date (£m) 0.696 -0.441 -0.971 -1.315 -1.768 -2.515 -3.067 -3.636 -3.828  
Total
Proposed
Savings (£m)
0.696 0.270 -0.460 -1.509 -2.696 -3.884 -5.071 -6.259 -7.446  
Total Actual
Savings to
date (£m)
0.696 0.255 -0.715 -2.031 -3.799 -4.283 -5.582 -6.703 -7.464   
To date savings of £7.464 million have been realised from a target of £3.828. Million. 
This is £3.636 million ahead of target.   
The Benefits Realisation Strategy and Plan has provided the framework for achieving
the £8.634 million of savings by 2023.
The Benefits Realisation Strategy and Plan
• Ensures benefits are identified and also defined at the outset, and appropriately
linked to the East Ayrshire and South Ayrshire Council’s strategic objectives.

Page 27

24
• Ensures relevant business areas are prepared to realising their defined benefits.
• Reduces the risk of unrealistic optimism in the Detailed Business Case and
subsequent benefits realisation dilution or delay during or after potential
implementation.
• Drives the process of realising benefits, including benefits measurement,
tracking and recording benefits as they are realised.
• Uses the defined, expected benefits as a roadmap for the programme, providing
a focus for delivering change.

Page 28

25 
AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2022/23
Action Success Criteria/
Desired Outcome Responsible Timescale Details
1 Continue to use the integrated
Roads Asset Management
Plan across the Ayrshire
Roads Alliance.
There is one Asset Plan for the
Service delivering a risk based
approach for full service
delivery
Head of Service March 2023. SCOTS RAMP Project.  Development work
has been extended with staff attending various
external workshops to progress this work.  
2 Continue to prepare details for
developing an integrated Local
Transport Strategy.
A Strategy covering both
Council areas, which will
involve consultation with
stakeholders.  Information will
be gathered to inform the
future Local Transport
Strategy.  
Continue to contribute to the
Scottish National Transport
Strategy, Regional Transport
Strategy and Strategic
Transport Projects Review
work.
Head of Service  March 2023 The Regional Transport Strategy, through
SPT, has just commenced on which the
Alliance has Board membership.  The Local
Strategy will be created as an appendix to the
Draft RTS when this is published in June 
2022
3 Action the Flood Risk
Management Plan
Complete schemes and
undertake studies.  Inform the
next national cycle of potential
flood risk management
schemes beyond 2022.
Head of Service January 2023 Continue with construction of new Cumnock
Phase 2.  Continue design work on the Irvine
Valley Work.  Continue with flood study works
for the River Ayr, River Doon and in Girvan.
Continue to engage with SEPA with the final
document due for publication Autumn 2022
with reports brought to committees within East
and South Ayrshire.
4 Improve the condition of the
road network.
Improve annual roads survey
results which are part of the
Head of Service Site works will be
undertaken
Key dependencies are the Road Improvement
Plans approved by the relevant Committees in

Page 29

26
Action Success Criteria/
Desired Outcome Responsible Timescale Details
SRMCS work.  Ensure the
Alliance undertakes more
proactive maintenance.
throughout
2022/23.
East Ayrshire and South Ayrshire in spring
2022.  Progress is provided to members, and
relevant Committees.
5 Ensure the road network
remains safe through raising
awareness and improving road
safety through education,
engineering and enforcement.
Reduce road accidents in line
with government targets. 
Provide appropriate traffic
management schemes and
initiatives.
Strategic Manager
Roads and
Transportation 
March 2023 Scottish Government and SCOTS guidance is
used.  A key dependency is the Road
Improvement Plans which are presented to
Cabinet and Leadership each year.
6 Improve the condition of the
bridge stock.
Improve bridge condition index.
Reduce the number of weight
restricted bridges.  Complete
all general, special and
principal bridge inspections.  
Design &
Environment
Manager
March 2023 Through the Road Asset Management Plan. 
Key dependencies are Road Improvement
programmes approved by Committees in East
Ayrshire and South Ayrshire in spring 2022.  
Deliver the capital and revenue programmes.
7 Manage and improve the
street lighting asset and install
energy efficient lighting
schemes.
Maintain high standard of fixing
dark street lights.  Complete
the LED lighting replacement
programme in both East
Ayrshire and South Ayrshire.
Head of Service October 2023 Through the Road Asset Management Plan,
with additional funding being provided to
commence the LED programme.
At present performance is 35% of streets
lights are now LED in EAC; and 80% in SAC.
On target for completion within timescales.
8 Maximise and deliver
externally funded sources of
work
Identify external funding
sources and deliver work on
time and on budget.  Improve
infrastructure; and contribute to
improving the condition of the
network.
Head of Service Works will be
undertaken
throughout the
2022/23.
External sources, including Timber Transport,
SUSTRANS, SPT - Regional Transport
Partnership, CWSS - Cycling Walking and
Safer Streets. Scottish Government Bridge
Fund.SFT
9 Implementation of Parking
Strategy
Develop Head of Service Works will be
undertaken
Amendments to TRO’s, lining, signing and
residential parking permits and implementing

Page 30

27
Action Success Criteria/
Desired Outcome Responsible Timescale Details
through 2022/23 an improved process using digital technology.
10 Prepare Service Plan Publish Head of Service Annual East Ayrshire Council Community Plan. South
Ayrshire - Local Outcomes Improvement Plan
and Local Place Plans.  Draft Plan to be
submitted to Joint Committee in December
2022.
11 Continue to review insurance
costs and insurance issues. 
Review current practices to
minimise insurance costs.
Head of Service Complete Ayrshire Roads Alliance Monthly Insurance
Report.
There is good dialogue with the Risk &
Insurance to ensure our work improves the
number of repudiated claims.  The number of
claims has greatly reduced due to the
implementation of the new Code of Practice.
12 Review Depots and
Accommodation
Continue to review in 2022/23
from initial work was completed
in 2017 as a result of amended
working practices.
Head of Service March 2023 Joint Committee Reports of November 2016.
Although initial work has been completed we
continue to strive to make depot and
accommodation cost savings. Further work
will continue on this as a result of COVID and
the return to office space during 2022/23.
13 Review vehicle and plant costs Continue to review in 2021/22
from initial work that was
completed in 2017.
Head of Service March 2023 Joint Committee Reports of June 2016
The service continues to review fleet
requirements with the most recent
improvement being on the management of
vehicle utilisation, electric vehicles and
Telematics.
14 Monitor and exercise Business
Continuity Plans
Improved resilience. Business Support
Manager
Review and
update following
relevant local and
Existing East Ayrshire and South Ayrshire
Council plans

Page 31

28 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details 
national events. 
15 Continue to use the Roads
Costing System to its full
potential. 
Improve service performance
from both an on-site and
financial perspective. 
Business Support
Manager
August  2022 Revised roads costing system was fully
operational from November 2018. 
The system continues to be used to monitor
performance and work is ongoing to
implement digital timesheets linked to the
Roads Costing System. 
16 Support and contribute to the
Ayrshire Growth Deal 
Transport Summit has taken
place and outcomes are
included in the National
Transport Strategy, Regional
Transport Strategy and the
Strategic Transport Projects
Review.   
Head of Service October  2022 The Transport Appraisal being led by
Transport Scotland commenced in January
2019.  We continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review 2 work. 
17 Regional Transport Strategy Successfully contribute to the
preparation of this work being
led by SPT.  The Alliance has
Board representation. 
Head of Service June  2022 SPT documents and existing Regional
Transport Strategy 
Work is on-going with the completion date for
the draft RTS to be published June 2022. 
18 Regional Transport Appraisal Ensure the various projects
identified as part of this work
are included in the Strategic
Transport Projects Review.  
Head of Service October 2022 Transport Scotland documents 
Work is on-going with the completion date for
the STPR2 of October 2022.
19 National Transport Strategy East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure the
sustainable transport hierarchy
and sustainable investment
Head of Service October 2023 In recognition of the anticipated increase in
Active Travel work, it is proposed that a
member of staff is dedicated directly to this
work.

Page 32

29
Action Success Criteria/
Desired Outcome Responsible Timescale Details
hierarchy are delivered.
20 National Transport Strategy –
review of Governance
East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
needs of the road
users/communities in both
Council areas.
Head of Service March 2023 National Transport Strategy
21 Transport (Scotland) Bill - East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure the work
provides the best outcome for
road users in both Council
areas.
Head of Service Complete Transport (Scotland) Bill received Royal
Assent 15 November 2019.
22 Transport (Scotland) Bill - East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure a
pragmatic approach is taken in
delivering the pavement
parking ban in both Council
areas.
Head of Service March 2023 Transport (Scotland) Bill and Transport
Scotland Parking Standards working group
still awaiting guidance from Transport
Scotland.
23 Levelling Up Fund East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
needs of the road
users/communities
Head of Service June 2022 Levelling Up Fund bids will be submitted June
2022.

Page 33

30 
East Ayrshire Council Strategic Priorities 2022/23 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details
1 Progress and complete the
New Cumnock Flood
Protection Project 
Complete the flood prevention
projects at the Leggate and
beside the Afton Water. 
Head of Service November 2022 East Ayrshire Council and Scottish Government
funding.  The Leggat stage of the works was
completed in August 2018 with the Afton Water
phase commenced May 2021 with an 18 month
contract duration
2 Develop Projects approved
from the Flood Risk
Management Plan  
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022. 
Head of Service October  2022 East Ayrshire Council and Scottish Government
Funding.  Continue with work on studies for the
Irvine Valley, Dalrymple, Catrine and
Dalmellington through the financial year.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth
concerns.  Contribute to
infrastructure projects which are
being developed through the
Regional Transport Appraisal
work being led by Transport
Scotland. 
Head of Service October  2022 The all Ayrshire Transport Appraisal being led
by Transport Scotland commenced in January
2019. We will continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review work.
4 Transformation 
Strategy 2 
Continue to provide a high
quality roads service within
decreasing available budgets. 
Includes service re-design work.
Head of Service Complete East Ayrshire Council reports to various
Committees. 
Work commenced and was completed by March
2022 including a full revision of ARA structure.
5 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network and East Ayrshire
Network
Head of Service Complete  A full review of active travel provision in East
Ayrshire has been undertaken and this will be
presented to the relevant East Ayrshire Council
Committee Summer 2022.

Page 34

31
Action Success Criteria/
Desired Outcome Responsible Timescale Details
6 EV Strategy Develop EV strategy across
East Ayrshire Network
Head of Service August 2022 A full review of EV provision in East Ayrshire has
been undertaken at present and this will be
presented to the relevant East Ayrshire Council
Committee with further work being carried out in
partnership with Scottish Futures Trust to
assess public charging funding models.
7 Levelling Up Fund Completion and Submission of
Bid for improvements to Bellfield
Interchange
Head of Service June 2022 Design and modelling work to improve Bellfield
to increase capacity and open up [development
opportunities.
8 Ash Die back Strategy Develop a risk based strategy
for the management of Ash Die
Back.
Head of Service August 2022 Develop a risk based approach to the
management of Ash Die Back.

Page 35

32
South Ayrshire Council Strategic Priorities 2022/23
Action Success Criteria/
Desired Outcome
Responsible Timescale Details
1 Implementation of car parking
strategy for South Ayrshire. 
Complete this work with
improved parking provision and
management.
Head of Service Complete A full review of car parking provision in South
Ayrshire is being undertaken at present and this
will be presented to the relevant South Ayrshire
Council Committee.
2 Develop Projects approved
from the Flood Risk
Management Plan
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022.
Head of Service October 2022 Flood study work in the Girvan area is
progressing and a report will be presented to the
relevant South Ayrshire Council Committee.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth
concerns.  Contribute to
infrastructure projects which are
being developed through the
Regional Transport Appraisal
work being led by Transport
Scotland.
Head of Service October 2022 The all Ayrshire Transport Appraisal being led
by Transport Scotland commenced in January
2019. We will continue to engage with Transport
Scotland to ensure the Ayrshire Growth Deal
transportation work is included in Strategic
Transport Projects Review work.
4 20mph speed restrictions in
villages
Progress with the 20mph speed
restrictions in all villages. 
Maintain engagement with the
local communities.
Head of Service March 2022 phase
1&2 Complete
March 2023
phase 3
Completed phase 1 and 2.
Design work and consultation phase 3
5 Anticipated Budget Reductions
in 2022/23
Continue to provide a high
quality roads service within
decreasing available budgets.
Includes service re-design work.
Head of Service March 2023 Reports to various Committees.

Page 36

33 
Action  Success Criteria/
Desired Outcome 
Responsible  Timescale  Details
6 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network
Head of Service Complete A full review of active travel provision in South
Ayrshire has been undertaken and was
presented to Leadership Panel. Strategy to be
published.
7 EV Charging Strategy  Develop further the  EV strategy
for South Ayrshire Network
Head of Service August 2022 A full review of EV provision in South Ayrshire
was being undertaken and approved by
Leadership Panel. This will be reviewed as a
result of work with Scottish Futures Trust to
assess public charging funding models.
8 Levelling Up Fund Submission of Active Travel bid Head of Service  June 2022 Joint bid with NAC for active travel route Ayr to
Irvine
9 Levelling Up Fund Submission of A70 Improvement
Package
Head of Service June 2022 Bid submission for A70 improvements.
10 Motorhome Trials Develop Campervan sites along
the coastline.
Head of Service March 2023 Formalisation of two temporary sites at Girvan
and Ayr and additional trials at Ballantrae,
Maidens, Prestwick and Troon.
11 Strategic Economic Impact
Assessment A75/A77
There is a growing desire to
understand the importance /
effectiveness of the
improvements outlined along the
A75 and A77.
Head of Service July 2022 Public consultation / survey covering
communities throughout Ayrshire (North, South
and East) and Dumfries & Galloway is currently
being undertaken. To date there has been
approximately 600 responses, with more
responses expected as the survey is promoted
on social media and the radio. Final report
complete for reporting July 2022.

Page 37

34
APPENDIX 1 – ORGANISATIONAL CHART 
Chair
Joint Committee
Chief Executive of
South Ayrshire Council
Chief Executive of  
East Ayrshire Council
Director of Place
Depute Chief Executive
Strategic Lead: Safer
Communities
Head of Roads
Strategic Manager Strategic Manager
• Traffic, Parking & Road Safety
• Transportation & Flooding
• Roads & Structures Design 
• Finance & Admin Support
• Reviews of service activities
• Business Continuity
• Street Lighting
• Roads Maintenance Unit
• Girvan Harbour

Page 38

35

Page 39

36
APPENDIX 2 – STRATEGIC AND LOCAL DELIVERY SPLIT
TABLE 1 - PROPOSED SPLIT BETWEEN STRATEGIC AND LOCAL DELIVERY
Strategic Service Delivery Local Service Delivery
Asset and Performance
Local Transport Strategy; Transportation Policy;
Road Safety Plan; Cycling Strategy
Council/Partner Liaison; 
Transportation, Development Control and
Road Safety
Maintenance of Bus Shelters; Split Cycle
Offset Optimisation Technique (SCOOT)
systems (an adaptive control system for
controlled road crossings); Development
Control; Bus Shelter Advertising;
Shopmobility; Travel Planning; Planning
Applications; Development Planning;
Section 75 Agreements; Road Safety Audits;
School Travel Plans; School Crossing
Patrol; Road Safety Education.
Maintenance of Traffic signals, traffic signs,
Traffic Orders; Traffic Counts, Accident
Investigation and Prevention;
Asset and Performance
Asset Management Plan; Performance
Monitoring; Parking Strategy.
Scottish Roadworks Register
Asset, Traffic and Parking Car Park
Maintenance and Parking Enforcement.
Roads Improvement Plan; Infrastructure
Surveys; Inventory Management; Issue of
Permits; Accident Investigation and
Prevention; 
Asset and Performance
Flood Risk Management Strategy; Flood Risk
Management Plans;
Design and Environment
Maintenance of Watercourses, Bridges,
Retaining Walls, Piers and Harbours.
Watercourses; Flood Mitigation; Coastal
Protection; Inspection of Piers & Harbours;
Bridge Inspections and Maintenance;
Structural Assessments; Technical Approval;
Abnormal Load Routing; and Design of
Major Road Schemes and Improvements.
Road Construction Consents
Construction and Roads Maintenance
Winter Service Planning; Street Lighting
Management; 
Operations
Proactive, Reactive, Cyclic Maintenance of
Roads and Footways; Winter and Weather
Emergency Service; Proactive and Reactive
Maintenance of Streetlights; Electricity costs
for streetlights. Carriageway Inspections;
Programming of Proactive, Reactive and
Cyclic Maintenance; Street Lighting Design;
Festive Lighting, Construction of Road
Safety Schemes; Design of Minor Road
Schemes.EV Charging.

Page 40

37
Strategic Service Delivery Local Service Delivery
Business Operations
Scottish Roadworkers National Training
Programme
New Business opportunities
Support Services       
HR, Finance, ICT, and Administrative Support.
TABLE 2 - CURRENT SPLIT BETWEEN STRATEGIC AND LOCAL DELIVERY
Strategic Service Delivery Local Service Delivery
Transportation, Development Control and
Road Safety
Local Transport Strategy; Transportation Policy;
Road Safety Plan; Travel Planning, Cycling
Strategy; Planning Applications; Road
Construction Consents; Development Planning,
Council/Partner Liaison, Section 75 Agreements;
Road Safety Schemes; Road Safety Audits;
School Travel Plans; School Crossing Patrol;
Road Safety Education.
Transportation, Development Control and
Road Safety
Maintenance of Bus Shelters; Split Cycle
Offset Optimisation Technique (SCOOT)
systems (an adaptive control system for
controlled road crossings); Development
Control; Bus Shelter Advertising;
Shopmobility; Construction of Road Safety
Schemes.
Asset, Traffic and Parking
Asset Management Plan; Roads Improvement
Plan; Infrastructure Surveys; Inventory
Management; Scottish Roadworks Register;
Issue of Permits; Performance Monitoring;
Accident Investigation and Prevention; Traffic
Orders; Traffic Counts; and Parking Strategy.
Asset, Traffic and Parking
Maintenance of Traffic signals, traffic signs,
Car Park Maintenance and Parking
Enforcement.
Design and Environment
Flood Risk Management Strategy; Flood Risk
Management Plans; Watercourses; Flood
Mitigation; Coastal Protection; Inspection of Piers
& Harbours; Bridge Inspections and Maintenance;
Structural Assessments; Technical Approval;
Abnormal Load Routing; and Design of Major and
Minor Road Schemes and Improvements.
Design and Environment
Maintenance of Watercourses, Bridges,
Retaining Walls, Piers and Harbours.
Operations
Carriageway Inspections; Winter Service
Planning; Programming of Proactive, Reactive
and Cyclic Maintenance; Street Lighting Design
and Management; and Festive Lighting.
Operations
Proactive, Reactive, Cyclic Maintenance of
Roads and Footways; Winter and Weather
Emergency Service; Proactive and Reactive
Maintenance of Streetlights; Electricity costs
for streetlights.

Page 41

38

Page 42

2014 2015 2016 2017 2018 2019 2020
Number of people killed or seriously injured in road
accidents per 100,000 population 25 29 29 33 59 46 36
Number of slightly injured casualties per 100,000
population 147 176 138 150 181 86 65
2011/13 2012/14 2013/15 2014/16 2015/17 2016/18 2017/19 2018/20 2019/21 2011/13 2012/14 2013/15 2014/16 2015/17 2016/18 2017/19 2018/20 2019/21
% of A Class roads that should be considered for
maintenance 27.06% 29.70% 26.20% 24.60% 21.30% 19.10% 19.80% 21.20% 23% 22.10% 38.40% 41.60% 42.20% 40.50% 38.60% 38.20% 36.10% 34.40% 34.10%
% of B Class roads that should be considered for
maintenance 31.89% 37.80% 37.80% 36.90% 34.20% 34.00% 35.70% 32.20% 32.50% 32.60% 47.90% 49.70% 50.40% 48.90% 43.90% 40.70% 38.10% 36.90% 37.30%
% of C Class roads that should be considered for
maintenance 34.22% 42.10% 46.50% 45.50% 40.30% 38.50% 40.50% 40.60% 38.80% 33.50% 43.20% 48% 49.50% 43.90% 40.20% 41.40% 42.40% 42.20% 40.80%
% of unclassified roads that should be considered for
maintenance 39.84% 43.60% 45.00% 44.10% 44.90% 45.60% 44.00% 43.70% 42.10% 42.30% 44.90% 46.20% 42.00% 43.30% 43.30% 41.40% 42.90% 42.30% 43.30%
Overall % of road network that should be considered
for maintenance - 40.60% 41.70% 40.80% 39.40% 39.10% 39.00% 38.40% 37.80% 36.80% 44.50% 46.80% 45.00% 44.10% 42.30% 41% 41.30% 37.80% 40.90%
MONTHLY PERFORMANCE INDICATORS
APSE
Average
2015/16
Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
No of invoices paid within 30 days 428 906 1336 1,749 2,069      2453 2893
No of Invoices Received 431 917 1,366 1,782 2,107      2491 2939
% of invoices paid within 30 days 99% 98% 97% 98% 98% 98% 98%
Average Year to date of Number of Invoices paid
within 30 days 99% 99% 98% 98% 98% 98% 98%
Number of ARA Safety Inspections Completed within
Timescale 52 52 47 50 51 46 40 46 48 49 52 51
Number of ARA Safety Inspections Scheduled 52 52 47 50 51 48 44 46 48 49 52 51
% of ARA Safety Inspections Completed within
timescale 100% 100% 100% 100% 100% 96% 91% 100% 100% 100% 100% 100%
Number of Health and Safety Incidents Reported to the
Health and Safety Section 4 1 3 2 3 3 3 3 2 1 3 2
Average Number of days to report an incident to the
Health and Safety Section 1.5 4 2 1 1 1.3 1.7 2 1 2 2 1
Average days lost per employee - - 0.64 0.51 0.81 0.83 0.86 0.84 0.53 0.52 0.54 0.51 0.48 0.56
Visits to the ARA Website every month -
49,000
per
annum
2,421 4,649 7,036 7,331 5,340 6,710 6,940 5,128 4,016 5,312        7,123 7,068
No of Twitter Followers every month - - - 3,896 3,913 3,938 3,966 3,999 4,005 4,058 4,089 4,106 4,137        4,197      4,238
Monthly visits to the website from social media - 1,800 per
annum 504 553 520 490 567 571 2082 1142 618 738 1989 2473
Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
ANNUAL PERFORMANCE INDICATORS                                                                                              
(FINANCIAL YEAR)
APSE
Average
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
APPENDIX 2 AYRSHIRE ROADS ALLIANCE PERFORMANCE SCORECARD DETAILED MONITORING REPORT
ANNUAL REPORT 2021/2022
AYRSHIRE ROADS ALLIANCE
Comments
FINANCE
WELL ENGAGED
ANNUAL PERFORMANCE INDICATORS
(CALENDAR YEAR)
AYRSHIRE ROADS ALLIANCE
92.02%
-
MONTHLY PERFORMANCE INDICATORS
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
Comments
90%
5
APSE
Average
2015/16
Finance unable to provide data for the
last 5 months due to system issues.  
However, all invoices have continued to
be paid within the 30 days
HEALTH AND SAFETY
ABSENCE MONITORING
98%-
Appendix 2

Page 43

Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
Number of staff who have received annual
EAGER/PDR review 11 10 14 14 14 14 14 14 14 14 14 14 13 1 22 22 22 22 22 22 22 22 22 22
% of staff who have received annual EAGER / PDR
review 1% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 17% 3% 37% 37% 37% 37% 37% 37% 37% 37% 37% 37%
Number of parking appeals accepted 5 40 27 28 15 33 30 24 22 20 25 23 12 22 25 15 43 38 37 29 12 19 50 42
Number of parking appeals received 19 72 64 58 69 41 78 81 59 68 84 78 39 49 71 84 100 61 85 84 49 71 116 101
% of parking appeals accepted 26% 56% 42% 48% 21% 80% 38% 30% 37% 29% 38% 29% 31% 45% 35% 18% 43% 62% 43% 35% 24% 27% 43% 42%
Physical % of Roadworks Programme Completed - 100% 12% 22% 23% 26% 28% 30% 31% 35% 55% 62% 82% 100% 100% 7% 20% 30% 40% 50% 60% 75% 90% 98% 99% 100% 100%
Number of General Bridge Inspections 61 22 54 27 75 66 51 48 0 49 78 52 28 42 70 51 74 31 23 53 4 0 0 26
Number of General Bridges Inspected Year to Date 61 83 137 164 239 305 356 404 404 453 531 583 28 70 140 191 265 296 319 372 376 376 376 402
Number of Special Bridge Inspections 11 68 11 66 6 63 7 62 7 62 7 62 25 2 26 2 25 2 25 2 24 2 24 4
Number of Special Bridge Inspections Year to Date 11 77 88 154 60 123 130 192 199 261 268 330 25 27 53 55 80 82 107 109 133 135 159 163
Number of Principal Bridge Inspections 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6 0 0 6 5 3 6 2 14 6
Number of Principal Bridge Inspections Year to Date 0 0 0 0 0 0 0 0 0 0 0 0 6 0 12 12 12 18 23 26 32 34 48 54
Number of Category 1 Road Emergency defect repairs
made safe within 2 hours 2 2 2 3 4 2 3 20 4 14 0 4 1 2 1 13 7 2 3 16 20 1 1 1
Number of Category 1 Repair Lines issued 2 2 2 3 4 2 3 20 4 16 0 5 1 2 1 13 7 2 3 20 20 1 1 1
% of Category 1 Road Emergency defect repairs made
safe within 2 hours 100% 100% 100% 100% 100% 100% 100% 100% 100% 88% - 80% 100% 100% 100% 100% 100% 100% 100% 80% 100% 100% 100% 100%
Number of Category 2 Road Emergency defect repairs
made safe within 5 working days 24 13 26 15 10 6 12 4 18 189 2 32 25 2 11 43 50 5 13 11 80 16 4 14
Number of Category 2 Repair Lines issued 30 28 27 17 18 11 19 6 24 217 6 36 26 2 12 45 63 10 14 11 95 17 7 16
% of Carriageway Category 2 Defects repaired within 5
working days 80% 46% 96% 88% 56% 55% 63% 67% 75% 87% 42% 89% 96% 100% 92% 96% 73% 50% 93% 100% 84% 94% 57% 88%
Number of Street Lighting repairs completed within 7
working days 113 13 86 104 137 275 434 241 204 205 187 133 68 10 49 36 51 116 88 224 139 110 96 71
Number of Street Lighting Repair Lines Issued 121 28 91 107 142 291 458 302 268 259 202 141 70 10 60 38 51 125 90 234 147 114 97 71
% Street Lighting repairs completed within 7 working
days 94% 46% 95% 97% 97% 95% 95% 80% 76% 79% 92% 94% 98% 100% 82% 95% 100% 93% 98% 96% 95% 96% 98% 100%
Number of Traffic light repairs completed within 48
hours 6 20 10 10 7 13 8 7 9 6 19 8 13 8 12 14 11 7 10 11 10 14 9 9
372
75%
56
95%
PRIORITY 1 DEFECTS
88.07%
-
88
76.23%
-
95%
-
PRIORITY 2 DEFECTS
MONTHLY PERFORMANCE INDICATORS
50%
--
91.20%
50%
BRIDGES
-
PARKING
435
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
FACETIME
150
75%
257
Comments
-
TRAFFIC
100% 100%
APSE
Average
2015/16
STREET LIGHTING
-
ROADWORKS PROGRAMME
-
X0A1H
X0A2HX0A3HX0A4HX0A5H
X0A6HX0A7H X0A8HX0A9H
X0A10H

Page 44

Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
MONTHLY PERFORMANCE INDICATORS
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
Comments
APSE
Average
2015/16
Number of Traffic light repair lines issued 6 20 10 10 7 14 8 8 9 6 19 8 13 8 12 14 11 8 10 12 10 15 10 10
% of Traffic light repairs completed within 48 hours 100% 100% 100% 100% 100% 92% 100% 88% 100% 100% 100% 100% 100% 100% 100% 100% 100% 88% 100% 92% 100% 93% 90% 90%
Number of Stage 1 Complaints responded to within
allotted timescales 1 2 2 0 2 0 2 1 1 0 0 1 1 0 0 2 3 3 1 3 2 1 1 1
Numer of Stage 1 Complaints received 1 2 2 0 2 0 2 1 1 0 0 1 1 0 0 2 3 3 1 3 2 1 2 1
% of Stage 1 Complaints responded to within allotted
timescales 100% 100% 100% - 100% - 100% 100% 100% - - 100% 100% - - 100% 100% 100% 100% 100% 100% 100% 50% 100%
Number of Stage 2 complaints responded to within
allotted timescales 0 0 0 0 0 2 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1
Number of Stage 2 complaints received 0 0 0 0 0 2 2 0 0 0 0 0 0 1 0 1 0 0 0 0 0 1 0 1
% of Stage 2 complaints responded to within allotted
timescales - - - - - 100% 100% - - - - - - 100% - 100% - - - - - 100% - 100%
Number of enquiries responded to within allotted
timescales 122 130 87 93 95 103 88 90 104 109 98 102 35 26 36 54 61 33 32 44 51 62 68 34
Number of enquiries received 140 158 118 131 123 131 110 103 136 128 120 129 51 48 59 59 85 45 47 50 58 76 77 40
% of enquiries responded to within allotted timescales 87% 82% 74% 71% 77% 78% 80% 87% 76% 85% 81% 77% 68% 54% 61% 92% 72% 73% 68% 88% 87% 81% 88% 85%
Number of FOI & EIR requests responded to within 20
working days 14 15 11 9 13 15 9 13 3 14 16 11 8 11 8 12 10 17 8 21 6 14 8 19
Number of FOI & EIR requests received 14 16 11 9 13 15 9 13 3 14 16 11 8 11 8 12 10 17 8 21 6 14 8 19
% of FOI & EIR requests responded to within 20
working days 100% 94% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Number of Public Liability claims closed 24 7 17 10 6 6 4 8 6 9 5 6 11 3 14 11 11 8 1 3 2 0 3 3
Number of Public Liability claims received 22 12 8 9 7 4 5 6 3 7 3 2 11 14 9 8 6 4 7 4 3 5 5 3
Total number of open claims 9 3 7 2 4 3 1 2 3 2 2 1 12 7 6 2 2 2 3 2 2 13 6 2
Number of Public Liability Claims that were successful 2 2 6 0 1 1 1 1 1 0 1 1 0 0 1 0 1 1 0 1 1 0 1 1
100%100%
100%100%-
95%
PUBLIC LIABILITY CLAIMS
FREEDOM OF INFORMATION
80%
COMPLAINTS
88.52%
-
88.23% 95%
100% 100%
83.44% 80%
ENQUIRIES
- - - - -
X0A0H