Ayrshire Shared Services Committee
A Meeting of the Ayrshire Shared Services Committee of North Ayrshire Council will
be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Friday, 13 March 2026 at 10:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003. Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2  Revenue Financial Monitoring Report 
Submit report by the Chief Financial Officer and Head of Finance and ICT 
on the revenue budget monitoring position for the year to 31 December 
2025 (copy enclosed).
3 Performance Scorecard
Submit report by the Head of Ayrshire Roads Alliance on the progress
made to date against the Performance Scorecard (copy enclosed).
4 Risk Report & Register
Submit report by the Head of Ayrshire Roads Alliance on the management
of risk associated with the Ayrshire Roads Alliance (copy enclosed).
5 Roadworks Programme 2025/2026
Submit report by the Head of Ayrshire Roads Alliance on the progress of
work through the roads improvement programmes within East Ayrshire and
South Ayrshire for financial year 2025 to 2026 (copy enclosed).
1

Page 2

6 Improvement Action Plan
Submit report by the Head of Ayrshire Roads Alliance on the management
of the Improvement Action Plan by the Ayrshire Roads Alliance (copy
enclosed).
7 Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing. At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed. 
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018. Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site. 
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest. 
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

Ayrshire Shared Services Committee Sederunt
North Ayrshire Council
Marie Burns
Joe Cullinane
Scott Davidson
Cameron Inglis 
East Ayrshire Council
Barry Douglas
Jim McMahon
Douglas Reid
John McFadzean 
South Ayrshire Council
Alec Clark
Martin Kilbride
Craig Mackay
Philip Saxton
Chair: 
Apologies: 
Attending: 
4

Page 5

Official
THE AYRSHIRE SHARED SERVICES JOINT COMMITTEE - 
13th MARCH 2026
Report by Chief Financial Officer & Head of
Finance & Digital
AYRSHIRE ROADS ALLIANCE
REVENUE FINANCIAL MONITORING REPORT
Purpose of report
1. The purpose of this Report is to update the Joint Committee on the revenue
budget monitoring position as at 31 December 2025, for the Ayrshire Roads
Alliance.
Recommendations
2. It is recommended that the Joint Committee
(i) Note the financial management position of the Ayrshire Roads
Alliance for 2025-26.
(ii) Note the interventions that are being taken to address the adverse
financial position
(iii) Requests a further financial update at the next meeting of the Joint
Committee.
(iv) Otherwise, notes the content of this report
Background
3. The Joint Committee approved a Report on 23 May 2014 describing the budget
monitoring arrangements for the Ayrshire Roads Alliance.
4. As part of the Detailed Business Case the service budget is split between
strategic service delivery and local service delivery.  This separates out the
core/recurring costs of service delivery from the local service costs at a single
Council level.  This ensures that decisions on the level of local spend remain
with local Members and ensures that the local Members retain control of their
local road budgets.  Appendix 1 provides a breakdown of this split.
5. At its meeting of 19th February 2016, Committee agreed a change to how
Strategic Service Delivery would be allocated between the two Councils. A
smaller group of core Strategic Delivery staff have been identified and their
costs continue to be split equally. The remaining Strategic Delivery costs would
be apportioned in line with Local Delivery budget inputs plus actual capital
expenditure in-year.
Agenda Item 2
5

Page 6

Official   
Budget Monitoring Position 
6. The overall outturn for 2025-26 is anticipated to be £0.639m greater than
budget. 
7. Strategic Delivery out-turn is anticipated to be £0.263m less than budget. 
Strategic Service Delivery Combined
(£m)
Initial Budget 3.688
Probable Outturn 3.425
Probable Variance (0.263) 
8. East Ayrshire Local Delivery anticipated out-turn is £0.934m greater than
budget and South Ayrshire Local Delivery £0.032m less than budget. 
9. Summary information is provided in the table below. A full budget monitoring
statement, including reasons for major variances is attached at Appendix 2.   
Actual
Expenditure
as at P9           
£m
Actual
Expenditure
as % of
Ann. Est.         
£m
Service Division Annual
Estimate
2025/26           
£m
Projection
to 31/3/26            
£m
Variance
(Favourable)
/ Adverse       
£m
1.978 53.6% STRATEGIC DELIVERY 3.688 3.425 (0.263)
4.716 112.2% LOCAL DELIVERY - EAST AYRSHIRE 4.203 5.137 0.934
5.479 105.5% LOCAL DELIVERY - SOUTH AYRSHIRE 5.191 5.159 (0.032)
12.173 0.0% TOTAL 13.082 13.721 0.639 
10. The position for each Council is shown below: 
EAC
(£m)
SAC
(£m)
TOTAL
(£m)
Strategic Delivery (0.422) 0.159 (0.263)
Local Delivery 0.934 (0.032) 0.902
2025-26 Variance 0.512 0.127 0.639  
11. To address the financial position, interventions have been put in place across
ARA to apply financial restraint.  These interventions will be challenging and
will require an increased level of financial control and monitoring to ensure
that their implementation has the desired impact. It is proposed that going
forward and until further notice: 
• A freeze is placed on the filling of all non-essential vacancies;
6

Page 7

Official
• An increased level of authorisation by Head of ARA is put in place for all
orders and expenditure above a specific level;
• Head of ARA is required to undertake detailed monthly monitoring of
expenditure to ensure robust review of essential spend.
• All contracts currently being tendered or appraised are to be
reconsidered by Head of ARA regarding continued need and availability
of resources. 
Progress will be reported to future meetings of Joint Committee. 
Implications
12. 
Implications Yes No Paragraph number
in the report
1. Policy/Strategic Planning Yes  13
2. Governance Yes  14
3. Human Resources Yes  15
4. Equality and Fairer Scotland Duty  No 
5. Financial Yes  16
6. Risk Yes  17
7. Community Wealth Building  No 
8. Net Zero  No 
Policy/strategic planning implications 
13. The work undertaken by the Ayrshire Roads Alliance aligns with the
Community Plan for East Ayrshire Council; and the Council Plan for South
Ayrshire Council. 
Governance implications 
14. The work of the Ayrshire Roads Alliance is undertaken in accordance with 
relevant legislation. 
Human resources implications 
15. The establishment of the Ayrshire Roads Alliance is dependent on the
available budget. Available budget and human resource requirements will be
reviewed as part of budget monitoring. 
Financial implications 
16. The available revenue budget for the Ayrshire Roads Alliance for 2025-26 is
£13.082m. The budget will continue to be monitored and reported to the 
Joint Committee. 
7

Page 8

Official
Risk implications 
17. Appropriate financial monitoring arrangements are in place to mitigate risk. 
This is included in the Ayrshire Roads Alliance Risk Register.  Regular
meetings are held between relevant finance staff and the Ayrshire Roads
Alliance. 
Appendices (if applicable) 
Appendix One - Split between Strategic and Local Service Delivery
Appendix Two - Financial Monitoring Report 
Background papers 
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance
Tel No: 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance
Tel No: 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
8

Page 9

Official 
Appendix 1 – Split Between Strategic and Local Service Delivery
Strategic Service Delivery Local Service Delivery
Transportation, Development Control
and Road Safety
Local Transport Strategy; Transportation
Policy; Road Safety Plan; Travel Planning,
Cycling Strategy; Planning Applications;
Road Construction Consents; Development
Planning; Council/Partner  Liaison; Section
75 Agreements;  Road Safety Schemes;
Road Safety Audits;  School Travel Plans;
School Crossing Patrol; Road Safety
Education. 
Transportation, Development
Control and Road Safety
Maintenance of Bus Shelters; Split
Cycle Offset Optimisation Technique
(SCOOT) systems (an adaptive
control system for controlled road
crossings); Development Control;
Bus Shelter Advertising;
Shopmobility; Construction of Road
Safety Schemes. 
Asset, Traffic and Parking
Asset Management Plan; Roads
Improvement Plan; Infrastructure Surveys;
Inventory Management; Scottish Roadworks
Register; Issue of Permits; Performance
Monitoring; Accident Investigation and
Prevention; Traffic Orders; Traffic Counts;
and Parking Strategy. 
Asset, Traffic and Parking
Maintenance of Traffic Signals,
Traffic Signs; Car Park Maintenance
and Parking Enforcement.
Design and Environment
Flood Risk Management Strategy; Flood
Risk Management Plans; Watercourses;
Flood Mitigation; Coastal
Protection; Inspection  of Piers & Harbours;
Bridge Inspections and Maintenance;
Structural Assessments;
Technical Approval;  Abnormal Load
Routing; and Design of Major and Minor
Road Schemes and Improvements. 
Design and Environment
Maintenance of Watercourses,
Bridges, Retaining Walls, Piers and
Harbours. 
Operations
Carriageway Inspections; Winter Service
Planning; Programming of Proactive,
Reactive and Cyclic Maintenance; Street
Lighting Design and Management; and
Festive Lighting.
Operations
Proactive, Reactive, Cyclic
Maintenance of Roads and
Footways; Winter and Weather
Emergency Service; Proactive and
Reactive Maintenance of Streetlights;
Electricity costs for streetlights. 
Support Services        
HR, Finance, ICT, and Administrative
Support. 
9

Page 10

SERVICE SUMMARY - OVERVIEW POSITION 
It is anticipated that Ayrshire Roads Alliance will outturn £0.639m greater than budget at
31st March 2026 
Actual
Expenditure
as at P9           
£m
Actual
Expenditure
as % of
Ann. Est.         
£m
Service Division
Annual
Estimate
2025/26           
£m
Projection to
31/3/26            
£m
Variance
(Favourable) /
Adverse       
£m
1.978 53.6% STRATEGIC DELIVERY 3.688 3.425 (0.263)
4.716 112.2% LOCAL DELIVERY - EAST AYRSHIRE 4.203 5.137 0.934
5.479 105.5% LOCAL DELIVERY - SOUTH AYRSHIRE 5.191 5.159 (0.032)
12.173 93.1% TOTAL 13.082 13.721 0.639 
STRATEGIC DELIVERY 
This variance reflects a number of vacant posts and turnover within the service (£0.260m)
and a budget for unfunded superannuation costs which will not be required (£0.100m). 
This is partly offset by a shortfall in income (£0.046m), Transport Costs (£0.034m) and
various Supplies & Services (£0.017m). 
LOCAL DELIVERY – EAST AYRSHIRE
This variance mainly reflects shortfalls in income particularly in roads maintenance
(£0.368m), capital fees (£0.150m) and parking charges  (£0.148m) along with winter
maintenance costs (£0.113m), sub-contractors, partly in relation to a saving on winter
maintenance which will not be achieved (£0.662m), maintenance of parking / EV charging
machines (£0.106m), computing (£0.038m), gully waste disposal (£0.048m), Weather
Forecast service (£0.029m), bus station security (£0.071m) and a number of minor
variances (£0.047m). This is offset by vacancies and turnover (£0.753m) and employee
recharges (£0.093m), particularly within Roads Maintenance.
LOCAL DELIVERY – SOUTH AYRSHIRE
This variance mainly reflects a delay in dredging at Girvan Harbour (£0.325m), vacancies
(£0.181m), maintenance materials (£0.255m), parking charges (£0.165m), additional
income within Street Lighting (£0.095m) and Design (£0.090m) and fuel (£0.056m). 
This is partly offset by additional expenditure on sub-contractors (£0.114m), shared
employee resources (£0.049m), property costs (£0.086m), street lighting electricity
(£0.062m), winter materials (£0.040m), vehicle / plant hires (£0.081m), vehicle
maintenance (£0.029m), maintenance of parking / EV charging machines (£0.054m),
computing (£0.051m) weather forecast service (£0.025m), consultancy (£0.026m) and a
number of small variances (£0.025m). There are anticipated shortfalls on capital fee
income (£0.200m) and roads maintenance income (£0.202m).   
10

Page 11

STRATEGIC DELIVERY 
Actual
Expenditure
as at P9           
£m
Actual
Expenditure
as % of
Ann. Est.         
£m Service Division
Annual
Estimate
2025/26           
£m
Projection to
31/3/26            
£m
Variance
(Favourable) /
Adverse       
£m
2.288 61.3% EMPLOYEE COSTS 3.730 3.364 (0.366)
0.029 96.7% PREMISES COSTS 0.030 0.030 0.000
0.048 129.7% TRANSPORT COSTS 0.037 0.071 0.034
0.129 16.6% SUPPLIES & SERVICES 0.776 0.793 0.017
0.005 0.0% THIRD PARTY PAYMENTS 0.000 0.005 0.005
0.005 0.0% DEBT CHARGES 0.004 0.005 0.001
2.504 54.7% TOTAL EXPENDITURE 4.577 4.268 (0.309)
(0.526) 59.2% INCOME (0.889) (0.843) 0.046
1.978 53.6% NET EXPENDITURE 3.688 3.425 (0.263)    
EARMARKED FUNDS TO BE CARRIED FORWARD      
1.978 53.6% TOTAL INCLUDING EARMARKED FUNDS 3.688 3.425 (0.263) 
11

Page 12

Projected
Variance at     
31 March
2026
(£m)
Strategic Delivery            
(0.366) 
0.034 
0.017 
0.046 
0.006               
Employee Costs
This variance mainly reflects a number of vacant posts and turnover
(£0.260m) and a budget for severance costs which will not be required
(£0.100m) 
Transport Costs
This variance reflects additional vehicle maintenance charges (£0.013m),
fuel and EV charging (£0.009m) costs, along with a number of smaller
variances (£0.012m). 
Supplies & Services
This variance mainly reflects additional computer related expenditure
(£0.011m), road safety training materials (£0.014m), subscriptions
(£0.004m) and insurance premiums (£0.006m). This is partly offset by  
savings on EV electricity (£0.018m). 
Income
This variance mainly reflects a shortfall in ad-hoc income, particularly in
relation to Temporary Traffic Regulation Orders and inspection fees. 
Other Variances
This represents other non-material variances within Strategic Delivery
(0.263) Total reported variance 
12

Page 13

LOCAL DELIVERY – EAST AYRSHIRE 
Actual
Expenditure
as at P9           
£m
Actual
Expenditure
as % of
Ann. Est.         
£m
Detail
Annual
Estimate
2025/26           
£m
Actual to
31/3/26            
£m
Variance
(Favourable) /
Adverse       
£m
1.993 56.7% EMPLOYEE COSTS 3.512 2.643 (0.869)
0.246 76.9% PREMISES COSTS 0.320 0.323 0.003
0.848 102.3% TRANSPORT COSTS 0.829 0.820 (0.009)
1.892 77.0% SUPPLIES & SERVICES 2.457 2.982 0.525
1.698 150.4% THIRD PARTY PAYMENTS 1.129 1.791 0.662
0.362 99.2% DEBT CHARGES 0.365 0.362 (0.003)
7.039 81.7% TOTAL EXPENDITURE 8.612 8.921 0.309
(2.323) 52.7% INCOME (4.409) (3.784) 0.625
4.716 112.2% NET EXPENDITURE 4.203 5.137 0.934    
EARMARKED FUNDS TO BE CARRIED FORWARD      
4.716 112.2% TOTAL INCLUDING EARMARKED FUNDS 4.203 5.137 0.934 
13

Page 14

Projected
Variance at   
31 March
2026
(£m)
Local Delivery - East Ayrshire 
(0.869) 
0.525               
0.662               
0.625 
(0.009)
Employee Costs
This variance represents vacant posts and turnover (£0.753m),
particularly within Roads Maintenance Unit, employee recharges in
respect of cross boundary working (£0.093m) and a saving on training
(£0.015m). 
Supplies & Services
This variance mainly reflects winter maintenance materials (£0.113m)
and EV Charging / Parking Machine maintenance contract (£0.106m),
bus station security (£0.145m) of which 50% is rechargeable to
Stagecoach, Roads and Street Lighting materials (£0.060m), weather
forecasting service (£0.029m), computing (£0.038m) and a number of
small variances (£0.034m). 
Third Party Payments
This variance mainly reflects additional use of sub-contractors within
maintenance (£0.526m) and street lighting (£0.064m), along with
additional expenditure in relation to bus stations (£0.053m). 
Income
This variance mainly reflects shortfalls in roads maintenance (£0.369m),
capital fees (£0.150m) and parking charges (£0.148m) income. This is
partly offset by bus station security recharge to Stagecoach (£0.043m). 
Other Variances
This represents other non-material variances within Local Delivery – East
Ayrshire
0.934 Total reported variance
14

Page 15

LOCAL DELIVERY – SOUTH AYRSHIRE 
Actual
Expenditure
as at P9           
£m
Actual
Expenditure
as % of
Ann. Est.         
£m
Service Division
Annual
Estimate
2025/26           
£m
Projection
to 31/3/26            
£m
Variance
(Favourable)
/ Adverse       
£m
1.746 64.4% EMPLOYEE COSTS 2.710 2.577 (0.133)
0.243 105.2% PREMISES COSTS 0.231 0.317 0.086
1.803 116.5% TRANSPORT COSTS 1.548 1.607 0.059
1.367 58.5% SUPPLIES & SERVICES 2.335 2.337 0.002
1.805 84.7% THIRD PARTY PAYMENTS 2.132 2.018 (0.114)
0.200 93.9% DEBT CHARGES 0.213 0.209 (0.004)
7.164 42.5% TOTAL EXPENDITURE 9.169 9.065 (0.104)
(1.685) 42.4% INCOME (3.978) (3.906) 0.072
5.479 105.5% NET EXPENDITURE 5.191 5.159 (0.032)    
EARMARKED FUNDS TO BE CARRIED FORWARD      
5.479 105.5% TOTAL INCLUDING EARMARKED FUNDS 5.191 5.159 (0.032) 
15

Page 16

Projected
Variance at   
31 March
2026
(£m) 
Local Delivery - South Ayrshire 
(0.133) 
0.086 
0.059 
(0.114) 
0.072 
(0.002) 
Employee Costs
This variance mainly reflects staff turnover due to vacancies (£0.181m),
partly offset by employee recharges in respect of cross boundary working
(£0.049m) 
Premises Costs
This variance reflects depot electricity (£0.040m) and non-domestic rates
charges (£0.045m). 
Transport Costs
This variance reflects additional expenditure on external hires (£0.081m)
and vehicle maintenance (£0.029m). This is partly offset by a saving on
fuel (£0.056m). 
Third Party Payments
This variance reflects a delay in dredging at Girvan Harbour(£0.325m),
partly offset by additional use of sub-contractors in relation to street
lighting (£0.070m), roads maintenance (£0.049m) and winter
maintenance due to an additional 2 routes being delivered externally
(£0.090m). 
Income
This variance mainly reflects shortfalls in roads maintenance (£0.397m)
and harbour (£0.020m) income This is partly offset by additional parking
charges (£0.165m), street lighting income (£0.095m) and design ad-hoc
income (£0.090). 
Other Variances
This represents other non-material variances within Local Delivery –
South Ayrshire
(0.032) Total reported variance
16

Page 17

17

Page 18

AYRSHIRE SHARED SERVICE JOINT COMMITTEE
13 March 2026 
Report by the Head of Roads – Ayrshire Roads Alliance
AYRSHIRE ROADS ALLIANCE
PERFORMANCE SCORECARD
Purpose of report
1. The purpose of this Report is to advise the Joint Committee regarding the
progress made to date against the Performance Scorecard.
Recommendations
2 It is recommended that the Joint Committee:
i. Notes the performance scorecard presented in this report;
ii. Continues to receive the performance scorecard updates; and
iii. Otherwise, notes the content of the report.
Background
3. The purpose of the performance management and benchmarking is to work
collaboratively to deliver tangible and sustained improvements within the
Ayrshire Roads Alliance in order to manage the on-going development and
delivery of benchmarking frameworks.
4. Improved performance management is fundamental to supporting the Ayrshire
Roads Alliance.  This drives change and improvement within the fully integrated
roads service and support improved outcomes, better performance, and more
effective use of resources.
5. The Performance Indicators are regularly refreshed when new useful performance
measures are introduced by the Ayrshire Roads Alliance or there is an
agreement to include a specific indicator.  This will be a regular item for the
Ayrshire Shared Service Joint Committee to review
Main report/main issues
6. This scorecard is used to:
• monitor the progress in meeting the Ayrshire Roads Alliance’s objectives;
• help managers to have performance-related conversations with staff; and
• identify any problem areas that need addressed.
Agenda Item 3
18

Page 19

7. Some indicators are collated at different frequencies and so these will be
included as appropriate. 
8. The Performance Scorecard is presented in Appendix 1.  Commentary against
the specific red and amber performance measures are included in Appendix 1.
There are a number of green performance measures which should be
highlighted, especially: 
• Finance with respect to the percentage of invoices paid within 30 calendar
days.  This is currently at 98% for this financial year. 
• Priority 1 and Priority 2 Faults – with respect to the percentage of priority 1
and 2 faults completed within timescale.  This is currently above target for
this financial year. 
• Street Lighting Repairs – with respect to the percentage of street lighting
repairs completed within the timescale.  The service has achieved an
average of 97% for this financial year. 
9. The Improvement Action Plan continues to identify improvements to a number of
existing processes for re-design within The Ayrshire Roads Alliance. 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning Yes  10 and 11
2. Governance Yes  12
3. Human Resources Yes  13
4. Equality and Fairer Scotland Duty Yes   14
5. Financial Yes  15
6. Risk Yes  16
7. Community Wealth Building Yes  17
8. Net Zero Yes  18 
Policy/strategic planning implications 
10.      A well-maintained road network will contribute to achieving the 2015-2030 
Community Plan objectives and associated 2021-2024 Delivery Plans 
11.      The matters referred to in this report contribute to Priority 1 of the South Ayrshire       
Council Plan: Spaces and Places/ Moving around and the environment       
(Outcome 1). 
19

Page 20

Governance Implications 
12. The work of the Ayrshire Roads Alliance is undertaken in accordance with 
relevant legislation. 
Humans resources Implications 
13.     The Performance Scorecard has no direct impact on human resources. 
Equality impact and Fairer Scotland duty implications 
14. The Performance Scorecard complements the Equality Impact Assessment by     
ensuring that any issues arising are adequately prioritised, managed and either
eliminated or mitigated. 
Financial implications 
15.   The Performance Scorecard facilitates the existing scrutiny arrangements to
manage, prioritise, and review the budget provided by East Ayrshire Council and
South Ayrshire Council to the Ayrshire Roads Alliance. 
Risk implications 
16.    The Performance Scorecard assists in the prioritisation of risks that need to be 
mitigated by the Ayrshire Roads Alliance in order to reduce the overall risk to
either Council  and to comply with the Community Plan/Council Plan in both
partner bodies. 
Community Wealth Building implications 
17. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people 
Net zero implications 
18.   The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
20

Page 21

Appendices (if applicable) 
1. Performance Scorecard 
Background papers 
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
21

Page 22

Official#
2021 2022 2023 2024 2021 2022 2023 2024
Number of people killed or
seriously injured in road accidents
per 100 000 population
36 42 48 34 37 54 28 54
Number of slightly injured
casualties per 100,000 population 49 58 82 57 41 52 30 58
2019/21
2019/21
Scotland
Average
2020/22
2020/22 
Scotland
Average
2021/23
2021/23
Scotland
Average
2022/24
2022/24
Scotland
Average
2023/25
2023/25
Scotland
Average
2019/21
2019/21
Scotland
Average
2020/22
2020/22 
Scotland
Average
2021/23
2021/23
Scotland
Average
2022/24
2022/24
Scotland
Average
2023/25
2023/25
Scotland
Average
22.10% 29.80% 17.20% 27.60% 15.60% 27.40% 17.60% 28.90% 17.70% 30.60% 34.10% 29.80% 28.90% 27.60% 23.00% 27.40% 21.7% 28.90% 23.4% 30.60%
32.60% 34.00% 26.85% 33.60% 27.00% 31.50% 26.10% 32.50% 25.20% 34.60% 37.30% 34.00% 34.40% 33.60% 32.50% 31.50% 31.0% 32.50% 28.6% 34.60%
33.50% 33.60% 29.50% 33.20% 29.60% 32.70% 31.00% 33.40% 30.80% 34.20% 40.80% 33.60% 37.90% 33.20% 38.90% 32.70% 38.1% 33.40% 37.6% 34.20%
42.30% 38.30% 40.90% 36.70% 40.60% 36.40% 39.00% 36.20% 37.00% 36.20% 43.40% 38.30% 42.90% 36.70% 41.00% 36.40% 38.5% 36.20% 36.4% 36.20%
36.80% 35.50% 33.80% 34.20% 33.50% 33.60% 33.00% 34.10% 31.70% 34.70% 40.90% 35.50% 39.00% 34.20% 37.40% 33.60% 35.5% 34.10% 34.0% 34.70%
MONTHLY PERFORMANCE
INDICATORS
APSE
Average Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec Comments APSE
Average Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec Comments
No of invoices paid within 30 days 333 357 323 383 361 378 418 330 276 - - 1.43 0.78 0.91 1.21 0.61 0.59 1.02 0.9 1.08
No of Invoices Received 341 358 325 390 365 379 422 333 288
% of invoices paid within 30 days 98% 99% 99% 98% 98% 99% 99% 99% 96% -
49,000
per
annum 
1,751 3,928 6,316 9,795 9,501 8,555 8,666 1,658 4,671
Average Year to date of Number of
Invoices paid within 30 days 98% 98% 98% 98% 98% 98% 98% 98% 98.00% - -  4,576 4,561 4,559 4,566 4,564 4,560 4,554 4,549 4,554
-
1,800
per
annum        
140 562 1,258 1,736 857 986 803 153 601
Number of ARA Safety Inspections
Completed within Timescale 25 24 20 16 23 21 16 24 7
Number of ARA Safety Inspections
Scheduled 25 25 20 20 24 22 16 24 8
% of ARA Safety Inspections
Completed within timescale 100% 96% 100% 80% 96% 95% 100% 100% 88%
Average Number of days to report
an incident to the Health and Safety
Section
1.5 2.7 36.3 1.6 3 1 1 1 1
AYRSHIRE ROADS ALLIANCE
EAST AYRSHIRE COUNCIL
Visits to the ARA
Website every
month
No of Twitter
Followers every
month
Monthly visits to
the website from
social media
AYRSHIRE ROADS ALLIANCE
ABSENCE MONITORING
92.02%
WELL ENGAGED
HEALTH AND SAFETY
MONTHLY PERFORMANCE APSE 
AYRSHIRE ROADS ALLIANCE PERFORMANCE SCORECARD DETAILED MONITORING REPORT
UPDATE : JOINT COMMITTEE  - 13TH MARCH 2026
ANNUAL PERFORMANCE INDICATORS                                                                                              
(FINANCIAL YEAR)
% of A Class roads that should be considered for maintenance
% of B Class roads that should be considered for maintenance
% of C Class roads that should be considered for maintenance
% of U Class roads that should be considered for maintenance
Overall % of the road network that should be considered for
maintenance
Average days lost
per employee
98%
AYRSHIRE ROADS ALLIANCE
FINANCE
East Ayrshire Council South Ayrshire Council
-
Performance
Information
ANNUAL PERFORMANCE
INDICATORS (CALENDAR
YEAR)
East Ayrshire South Ayrshire
SOUTH AYRSHIRE COUNCIL
22

Page 23

Official#
Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec
Number of Public Liability claims
closed 5 3 3 8 7 1 6 0 2 10 6 6 2 2 4 2 3 0
Number of Public Liability claims
received 6 7 3 3 7 3 1 2 13 7 3 3 3 3 5 3 6 4
Total number of open claims 57 63 63 27 35 44 39 41 52 65 46 40 34 38 40 41 44 48
Number of Public Liability Claims
that were successful 0 0 0 0 1 0 0 0 0 0 1 0 0 1 0 0 0 0
% of Public Liability Claims that
were successful 0% 0% 0% 0% 14% 0% 0% 0% 0% 0% 16% 0% 0% 50% 0% 0% 0% 0%
Number of Priority 1 Road
Emergency defect repairs made
safe within 2 hours
0 2 1 2 1 1 0 7 3 3 2 2 2 1 0 3 2 3
Number of Priority 1 Repair Lines
issued 0 2 1 2 1 1 0 7 3 3 2 2 2 1 0 3 2 3
% of Priority 1 Road Emergency
defect repairs made safe within 2
hours
- 100% 100% 100% 100% 100% - 100% 100% 100% 100% 100% 100% 100% - 100% 100% 100%
Number of Priority 2 Road
Emergency defect repairs made
safe within 5 working days
8 17 8 7 6 3 4 34 14 20 5 6 11 7 11 9 22 23
Number of Priority 2 Repair Lines
issued 10 18 10 8 6 3 4 36 14 0 5 7 11 7 11 9 25 25
% of Carriageway Priority 2 Defects
repaired within 5 working days 80% 95% 80% 88% 100% 100% 100% 95% 100% 95% 100% 86% 100% 100% 100% 100% 88% 92%
Number of Stage 1 Complaints
responded to within allotted
timescales
0 1 0 3 1 2 1 2 1 0 4 1 2 1 2 1 1 0
Numer of Stage 1 Complaints
received 0 1 0 3 1 2 1 2 1 0 4 1 2 1 2 1 1 0
% of Stage 1 Complaints responded
to within allotted timescales - 100% - 100% 100% 100% 100% 100% 100% - 100% 100% 100% 100% 100% 100% 100% -
Number of Stage 2 complaints
responded to within allotted
timescales
- 0 0 0 0 0 0 0 3 0 1 0 2 0 - 1 0 1 0
Number of Stage 2 complaints
received 0 0 0 0 0 0 0 3 0 1 0 2 0 - 1 0 1 0
% of Stage 2 complaints responded
to within allotted timescales - - - - - - - 100% - 100% - 100% - - 100% - 100% -
Number of parking appeals
accepted 30 29 33 36 34 42 58 47 33 62 75 52 36 31 74 55 37 41
Number of parking appeals
received 99 113 108 114 109 117 114 98 93 182 214 245 161 138 207 209 130 153
% of parking appeals accepted 30% 26% 31% 32% 32% 36% 51% 47% 35% 34% 35% 21% 22% 22% 35% 26% 28% 27%
MONTHLY PERFORMANCE
INDICATORS
APSE
Average
-
- --
100%
PARKING
-
50%
75%91.20%
PRIORITY 1 FAULTS
75%
PRIORITY 2 FAULTS
50%
COMPLAINTS
100%
2 0
-
00 00 02
- -
0 0
-
MONTHLY PERFORMANCE
INDICATORS
APSE
Average
100% -
-
100%
Number of staff who have received
annual FACETIME review
100%
76.23%
Comments
FACETIME
PUBLIC LIABILITY CLAIMS
-
EAST AYRSHIRE COUNCIL SOUTH AYRSHRE COUNCIL
100% 0 0 0 0 0
Managers are aware of
the importance of
undertaking FACE
reviews with staff
0 0 0
23

Page 24

Official#
Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec Target Current
Status Apr May Jun Jul Aug Sep Oct Nov Dec Comments
Number of General Bridge
Inspections - 20 
Number of Special Bridge
Inspections - 40 
Number of Principle Bridge
Inspections - 0 0 5 34 113 35 75 56 5 40 - 9 11 2 0 0 0 0 0 0
Number of Street Lighting repairs
completed within 7 working days 53 35 34 54 37 92 103 115 102 50 39 30 44 71 75 118 142 110
Number of Street Lighting Repair
Lines Issued 54 35 35 56 37 92 104 118 105 50 39 30 48 71 75 122 146 114
% Street Lighting repairs completed
within 7 working days 98% 100% 97% 99% 100% 100% 99% 98% 97% 100% 100% 100% 92% 100% 100% 97% 97% 97%
Number of Traffic light repairs
completed within 48 hours 26 27 14 21 28 20 33 19 20 22 11 18 14 9 18 18 16 12
Number of Traffic light repair lines
issued 26 27 14 21 28 21 33 20 20 23 13 18 14 9 19 19 16 14
% of Traffic light repairs completed
within 48 hours 100% 100% 100% 100% 100% 95% 100% 95% 100% 96% 85% 100% 100% 100% 95% 95% 100% 86%
Number of enquiries responded to
within allotted timescales 88 85 114 93 84 62 67 68 35 52 39 39 30 27 30 22 16 16
Number of enquiries received 90 88 118 94 87 65 72 74 45 55 45 44 31 27 35 27 24 24
% of enquiries responded to within
allotted timescales 98% 97% 97% 99% 97% 95% 93% 92% 78% 95% 87% 89% 99% 100% 86% 81% 67% 67%
Number of FOI & EIR requests
responded to within 20 working
days
28 13 15 16 30 16 18 18 8 25 9 23 14 23 17 17 21 17
Number of FOI & EIR requests
received 28 13 16 16 30 16 18 18 8 25 9 24 16 23 17 17 21 17
% of FOI & EIR requests responded
to within 20 working days 100% 100% 94% 100% 100% 100% 100% 100% 100% 100% 100% 96% 88% 100% 100% 100% 100% 100%
32
85%
88.52% 100%
-
88% 95%
88.23% 95%
83.44% 80%
8% 66% 80%1% 20%100% 48%
61761
305147 40
5
43 59 31
7 49 7
0 0 0
27 5 27
26 35
5 27
45
4
28% 40% 55%
761
1247
27
95%
100%64% 73%
ROADWORKS PROGRAMME
90% 95%11% 23%20% 33%
36
27
50
7
BRIDGES
-
-
ENQUIRIES
80%
FREEDOM OF INFORMATION
100%
Physical % of Roadworks
Programme Completed
STREET LIGHTING
95%
TRAFFIC LIGHTS
24

Page 25

AYRSHIRE SHARED SERVICE JOINT COMMITTEE
13 March 2026 
Report by the Head of Roads – Ayrshire Roads Alliance
AYRSHIRE ROADS ALLIANCE RISK REPORT AND REGISTER
Purpose of report
1. The purpose of this Report is to advise the Joint Committee on the management
of risk associated with the Ayrshire Roads Alliance.
Recommendations
2 It is recommended that the Joint Committee:
i. Notes the risk register presented in this report;
ii. Continues to receive updates on progress; and
iii. Otherwise, notes the content of the report.
Background
3 A report detailing the general approach to the Risk Report and Risk Register was
presented to the Joint Committee on 21 August 2014, where it was agreed that
the Risk Report and Risk Register would be a standing item on the agenda.  This
would ensure that the risks are monitored and scrutinised at a minimum on a
quarterly basis.    
Main report/main issues
4 The management of risk aims to enable confident decision taking on risk,
innovation, reduce waste and inefficiency, and lead to fewer unanticipated
problems and crises that could undermine the performance and operation of the
Ayrshire Roads Alliance.
5 The risk register is contained in Appendix 1. 
Since the last Joint Committee, there have been no risks added and no risks
removed from the Risk Register.
The revised risk register illustrates the red, amber and green status and also
illustrates whether the risk severity relates to time, indicated by [T] or cost,
indicated by [C].
Agenda Item 4
25

Page 26

Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning Yes  6 and 7
2. Governance Yes  8
3. Human Resources Yes  9
4. Equality and Fairer Scotland Duty Yes  10
5. Financial Yes  11
6. Risk Yes  12
7. Community Wealth Building Yes  13
8. Net Zero Yes  14 
Policy/strategic planning implications 
6.  A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire. 
7. The matters referred to in this report contribute to South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’. 
Governance Implications 
8. The work of the Ayrshire Roads Alliance is undertaken in accordance with
relevant legislation.             
Humans resources Implications 
9.       The Risk Register has no direct impact on human resources. 
Equality impact and Fairer Scotland duty implications 
10. The Risk Register complements the Equality Impact Assessment by ensuring
that any issues arising are adequately prioritised, managed and either eliminated
or mitigated. 
Financial implications 
11.     The Risk Register facilitates the existing scrutiny arrangements to manage,   
prioritise and review the budget provided by East Ayrshire Council and South
Ayrshire Council to the Ayrshire Roads Alliance. 
26

Page 27

Risk implications 
12.     The Risk Register assists in the prioritisation of risks that need to be mitigated by       
the Ayrshire Roads Alliance in order to reduce the overall risk to either Council       
and to comply with the Community Plan/Council Plan in both partner bodies. 
Community Wealth Building implications 
13. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people 
Net zero implications 
14.   The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
27

Page 28

Appendices (if applicable) 
1. Ayrshire Roads Alliance Risk Register 
Background papers 
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
28

Page 29

Appendix 1: Risk Register Scoring Matrix 
The Risk Matrix for deciding each of the risk factors (Likelihood x Severity) in a 5 by 5
matrix are illustrated in Table 1 below: 
Table 1: Risk Factors in Practical Form 
Rare (1) Unlikely
(2)
Possible
(3)
Likely
(4)
Almost
Certain
(5)
Catastrophic
(5) 5 10 15 20 25
Very Serious
(4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Insignificant
(1) 1 2 3 4 5
Risk Likelihood
Risk Severity
Following on from Table 1, the following Summary Risk Profile is colour coded to highlight
the risk classification: 
Table 2: Summary Risk Profile 
Assessed
Risk (LxS) Action Required
Low Risk: 
1 to 4 
Acceptable/ can be accepted provided risk is
managed.
Medium Risk: 
5 to 12
Undesirable/ must be avoided if reasonably
practicable.
High Risk: 15
to 25 
Unacceptable risk - must be eliminated or moved to
a lower level. 
29

Page 30

Official 
NOTE:
The Risk rating will be influenced by considering a combination of event effects
Such as associated cost, event duration, and organisational reputation.   
The table below will provide some assistance with risk rating. 
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
1  
a) 
b) 
Personnel Shortage
due to:
• Pandemic
Event 
• Resignation
• Retirement
• Strike Action
• Driver hour
restrictions
Loss of trained and
competent personnel from
all sections within ARA 
Business continuity plans in place
(BUS-12, 13, & 14) to manage all
ARA mission critical activities.       . 
Additional usage of external
contractors to ensure essential
services / works programme targets
are met.   Pandemic safe workplaces
/ sites established to accommodate
reduced number of staff 
Procedures are in place to manage a
short / medium disruption of
Technical / Supervisory / operational
Personnel including re-assignment of
duties and controlled overtime
working as required.  Over long term
there would be recruitment /
procurement of the necessary
experience to fill the gaps. 
3 4  12 [T]
All Service
Managers 
Head of Roads
– Ayrshire
Roads Alliance
The staff numbers are
reviewed whenever there are
significant changes in staffing
level.  The Ayrshire Roads
Alliance has Modern
Apprentices who are
providing a strong foundation
for future staffing levels as an
addition, The Ayrshire Roads
Alliance has appointed a
Training Officer who will
undertake refresher training
to the existing workforce
where skill gaps have been
identified.  Furthermore, the
Training Officer will develop
and enhance the skills and
competency with our MAs
and trainee road workers. 
30/1/26
2  Fuel Shortage Loss or restriction due to
relief events. Any event
that has an effect on the
cost of performing the
Services, or the date of
their completion, including
the occurrence of risks
both foreseen and
unforeseen e.g. industrial
action.
To mitigate the impact of losing
access or having a restricted access
to fuel, a contingency plan has been
established which sets out the
emergency management actions that
will be taken that include designated
fuelling stations and the prioritisation
of fleet, putting non-essential
vehicles off the road. 
3 3  9 [T]
Strategic
Manager
Head of Roads
– Ayrshire
Roads Alliance
Continuation of public
support will be dependent on
outcomes, though expect
some mixed reaction 
30/1/26 
To calculate the risk rating, multiply the 
Likelihood x Severity.    Example….   
Possible (3) X Significant (3) = Medium Risk 
Critical (5) 
Severe (4) 
Significant (3) 
Marginal (2) 
Insignificant  (1)      
SEVERITY INDEX 
LIKELIHOOD
INDEX 
Highly probable (5) 25 20 15 10 5
Probable (4) 20 16 12 8 4
Possible (3) 15 12 9 6 3
Unlikely (2) 10 8 6 4 2
Very Unlikely (1) 5 4 3 2 1 
Incident Severity Cost (£) [C] Time [T] Reputation
Min Max Min Max 
Insignificant (1) £0 £10,000 0 1 day Councillors/CEO
Marginal (2) £10,001 £50,000 1 day 2 weeks Local Media Facebook etc.
Significant (3) £50,001 £500,000 2 weeks 1 month Local Newspaper
Severe (4) £500,001 £1,000,000 1 month 3 months National Newspaper
Catastrophic (5) £1,000,001  >£1,000,001 3 months     > 6 months National News (TV)
KEY
High Risk (16 – 25) Risks are not acceptable under any circumstances. Immediate action required
Medium Risk (8 – 15) Additional controls measures may be required.
Low Risk (1 – 6) Continue to monitor as part of review process or where changes occur.
30

Page 31

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
3  Failure to align with
Budget
requirements 
Level of investment
required in road repairs
and resurfacing and
resulting cost of treatment
higher than anticipated. 
Reduced budget could
lead to the deterioration in
the roads network, an
increase in accidents, and
insurance costs.
Loss of parking income as
a result of policy changes.
Appropriate financial and
performance monitoring
arrangements in place to mitigate the
risk.  Regular meetings with and
within partners Councils to advice on
further resource and funding
requirements. 
2 4  8 [C]
Business
Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
Adequate control measures
are in place, specifically,
monthly meetings held with
budget holders to review
revenue budget and take
appropriate corrective
actions to bring budgets
within tolerance limits. 
Monthly meeting with service
managers to review capital
budgets and programmes. 
30/1/26
4
a) 
b) 
C) 
Adverse Weather 
Staffing Issues 
Salt 
Damage to salt
storage (Dome) 
Lack of trained and
competent personnel
including operatives and
drivers to provide full
complement required to
fulfil all gritting routes due
to lack of volunteers for
existing staff, flu
pandemic, mass
resignation, strike action
and breach of Working
Time Directive and Driver
Hours Legislation. 
Reduction and /or loss of
salt stock materials for
Winter Service
operations. 
Reduction and /or loss of
salt stock materials for
Winter Service
operations. 
Procedures in place to manage a
short / medium disruption of Driver /
Operative Personnel including
banking workers and overtime
working as required.  Over the long
term there would be recruitment /
procurement of the necessary
experience to fill the gaps. 
There is adequate salt stock
resilience and conservation control
measures.  Transport Scotland has
strategic salt stock piles. 
Areas identified within depot to stock
pile storage.  Transfer salt to
alternative depots. 
2
3
3
4
4
4
8 [C]  Strategic
Manager 
Head of Roads
– Ayrshire
Roads Alliance 
Rolling programme
established to ensure
ongoing Health and Safety
training.  Appropriate and
applicable checks are
conducted on all new drivers
to ensure that all reasonable
precautions are taken to
safeguard the ‘O’ licence,
insurance payments and
reputation.  The service has
extended the use of external
companies to provide the
winter service to increase
resilience
The Service has a framework
salt supplier with a 14 day
call down delivery.  There is
a joint agreement with other
Councils to share available
salt stocks.  The existing
weather service provides
long term forecast indicating
extreme and prolonged
weather conditions. 
Cover salt exposed to the
environmental elements. 
30/1/26
5  Loss of Street
Lighting & Traffic
Signals
Extended loss of Public
Electricity supply creating
issues with Street Lighting
and Traffic Signals
Some temporary traffic signals will be
provided at key locations determined
by the Traffic Management Section
should these issues arise. 
Temporary traffic signals deployed by
RMU.  Contingency measures 
3 3  9 [T]  Traffic & Road
Safety Manager
Head of Roads
– Ayrshire
Roads Alliance
We consider that the overall
risk is low due to the
mitigation measures that are 
in place 
30/1/26
31

Page 32

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
detailed in Business Continuity
Plans.
6 Transfer of Shared
Services – Ayrshire
Roads Alliance
Any failure in Service
provision would adversely
affect the resilience of the
Roads services.
Extensive negotiations have taken
place to ensure that the proposed
joint service meets stakeholders
needs 
2 2  4 [T]
Business Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
The new service is over ten
years old and it is considered
that the initial transfer of the
shared service has been
completed.  Nevertheless
there will always remain
issues on transfer issues
which may still arise. 
30/1/26
7 Council’s Waste
Transfer Licence
Loss off / restrictions on
waste transfer licence for
all depots
Robust management systems and
procedures in place to comply with
Environmental legislation, permit
conditions and health and safety 
2 3  6 [T]
Strategic
Manager
Head of Roads
– Ayrshire
Roads Alliance
We consider the overall risk
is low, due to the current
waste management systems
in operation.  Current
contract allows 
30/1/26
8 Council’s Operators
Licence (‘O’
Licence) - 
Loss off / restrictions on
Council’s ‘O’ Licence.
A comprehensive maintenance
regime has been established that
follows all guidance from DVSA and
the Traffic Commissioner to ensure
that the O-Licence is protected.
In addition, compliance activities are
established and in place and a
regular external audit is carried out
by the Freight Transport Association
every 2 years to ensure that all
processes are performing to the
required standard. 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Continue to work with fleet
service in East Ayrshire
Council.  30/1/26
9 Failure to meet
statutory duties in
relation to Road
Safety Inspections
Failure to provide a Risk
based approach and 
Inspection System in
accordance with the
approved, Inspection
Manual: Road Safety
Inspections and defect
categorisations.in
accordance with the Well-
Managed Highway
Infrastructure:
A Code of Practice.
There are procedures in place to
manage this process: 
1. Short term by prioritising and
reducing other works activities
and realigning budgets;
2. Medium / long term there would
be a request for additional
budgets;
3. Operatives can be assigned from
other duties and overtime
working approved. 
2 4  8 [T]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Following implementation of
the  Inspection Manual: Road
Safety Inspections and
defect categorisations from
1st April 2019 in accordance
with the Well-Managed
Highway Infrastructure:
A Code of Practice the
Ayrshire Roads Alliance 
a) Inspects the entire road
network within East
Ayrshire and South
Ayrshire, with
performance in relation
to the percentage of
safety inspections carried
out within the timescale
being reported to the
Joint Committee under
the Performance
Scorecard standing item
on the agenda. 
b) Categorise defects in
accordance with a risk
based approach ranking
defects one to four as 
30/1/26
32

Page 33

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
detailed in the Inspection
Manual: Road Safety
Inspections and defect
categorisations 
c) Issue repair lines for
defects on carriageways
and footways with target
response times
determined by the
category of defect, as
identified in the
Inspection Manual: Road
Safety Inspections and
defect categorisations 
d) Complete the vast
majority of Category 1
defects within the target
response time of two
hours.
10 Business Continuity
/ Emergency
Planning
Incident affecting one or
more of the Ayrshire
Roads Alliance service
functions (including ICT
Failure).
Business continuity plans developed
for: Roads Maintenance (including
the Winter Gritting Programme);
Lighting Maintenance Unit; Network;
Design and Traffic and Road Safety
facilities within East Ayrshire and
South Ayrshire.
To prevent fallout from IT system
failure, a business contingency plan
has been developed as well as a
back up process to revert to paper
based recording systems for fleet
management and maintenance. 
2 4  8 [T]
Business Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
The overall risk is high due to
the unknown nature of such
an incident and because of
the potential reputational
damage and adverse effect
on the service delivery,
including discharge of
statutory responsibilities. 
30/1/26
11 Benefits Realisation Ayrshire Roads Alliance
does not deliver the
expected benefits outlined
in the Detailed Business
Case of June 2013. 
Benefit Realisation Plan to track the
delivery of each benefit and take
corrective action where appropriate it
has been developed. 
A 10 year Service Review is due tol
be completed within the next couple
of years. 
2 3  6 [C] 
Service Managers Head of Roads
– Ayrshire
Roads Alliance
The overall risk is medium
due to the various reviews
outlined in the Benefits
Realisation Strategy and
Plan now progressing
towards fruition.  Internal
management reports to be
prepared reflecting on
progress against Benefits
Realisation Strategy.  As at 1
April 2018 had realised
budget savings of £2.031m
against a target of £1.510m 
30/1/26
12 Performance Performance Metrics are
missed. The Service
monitors the metrics and
also compares
performance against the
APSE average. 
A standardised operational process
and procedures has been developed
to ensure efficient and effective
processes and verification measures
are in place. 
1 4  4 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Performance metrics are
reviewed and developed with
the Pentana System being
used to review performance. 
Performance is reviewed at
every Management meeting. 
30/1/26
33

Page 34

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
13 Procurement Insufficient due diligence
carried out by the Ayrshire
Roads Alliance in the
procurement of goods and
services. – standardised
processes and
procedures in line with
Council’s contract
procedures.
Standardised processes and
procedures have been developed to
ensure efficient and effective
processes and verification measures
are in place. 
3 4  12 [T]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Managed Risk. 
30/1/26
14 Programme
Management
Programme scope,
schedule, objectives, cost
and deliverables are not
clearly defined or
understood. 
Estimating and / or
scheduling errors. 
Unplanned work that must
be accommodated. 
Lack of co-ordination /
communication 
Underestimated support
resources or overly
optimistic delivery
schedule 
Unresolved Programme
conflicts not escalated in
a timely manner. 
Unanticipated escalation
in Programme costs as a
result of uncontrolled
changes or continuous
Clear definition of scope, schedule,
objectives, cost, and deliverables
through Service Improvement Plan,
Benefits Realisation Strategy & Plan,
and Customer Service Strategy. 
A Programme Plan has been
developed which illustrates key
activities, team, timing, milestones,
and delivery of products. 
Incorporate unplanned work within
Programme Plan and minimise
impact on delivery of products
through parallel processes when
feasible 
Programme co-ordination and
communication conducted in
accordance with Programme
governance structure 
Ensure adequate resources are
managed / monitored which could
have implications relating to any
grant funded projects. 
Support resources and delivery
schedule developed from robust
Programme Plan and previous
experience of similar Programmes 
Programme conflicts recorded in
Issues Log and progressed in
accordance with reporting
arrangements for project team 
2 4  8 [T]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Managed Risk 
30/1/26
34

Page 35

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
inflation of a project’s
scope beyond initial remit 
Unanticipated delays in
Programme timescale as
a result of uncontrolled
changes or continuous
inflation of a project’s
scope beyond initial remit 
Communication Strategy
to engage public
awareness not planned
on a joint Ayrshire basis 
Priorities change on
existing service delivery. 
Affordability of future
service payments. 
Councils withdraw or
cannot provide sufficient
support, or agreed level of
input is not provided
resulting in Programme
delays
Escalation of Programme costs
addressed through appropriate and
applicable corrective actions and
control measures. 
Delay of Programme timescale
addressed through appropriate and
applicable corrective actions and
control measures. 
Ensure that a robust Communication
Strategy and response network is
developed during planning stages of
Programme which incorporates
sufficient key review stages to ensure
effective communication of key
messages regarding deliverables and
progress 
Ensure that changes on existing
service delivery are communicated in
accordance with the existing Service
Level Agreement 
Ensure that East Ayrshire Council
and South Ayrshire Council are fully
aware of the budgetary implications
required to meet the on-going cost of
service provision, as detailed in the
DBC, and have fully committed
sufficient financial resources
following Business Case sign-off. 
Early identification of problems, and
dialogue with Council.  The Ayrshire
Roads Alliance is developing a
module to project manage work
requests received by other Service
providers with East and South
Ayrshire Councils. 
15 Health & Safety /
Risk & Insurance
Insufficient investment,
resources and on-going
maintenance to resolve
issues identified in Health
& Safety surveys of
depots are on-going. This
Issues identified in Health and Safety
Surveys are recorded on Issues Log
along with corrective actions to rectify
/ bring up to the required standard.
To ensure that Health and Safety
processes are always followed, this 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
South Ayrshire Council
continues to have ownership
for and maintenance of
depots/harbour within their
area.  Responsibility of
funding the various mitigation
actions identified in the 
30/1/26
35

Page 36

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
also includes ensuring
security is adequate. New
harbour facility was
constructed along with
additional fencing, gates
and stillage for timber. 
Dredging is carried out bi-
annually.  Works have
been completed at
lifeboat station and new
sheet piling to be installed
along timber jetty. The
Ayrshire Roads Alliance
operates from and
manage risk of
enforcement action and
penalties should HSE
become involved.
is a standing agenda item held at
monthly management meetings.  In
addition to a separate H&S group
that meets on a quarterly basis with
the H&S Officer.  Risk assessments
and safe systems of work have also
been developed and are in place with
H&S assistance.
Issues Log sits solely within
the control of South Ayrshire
Council.  East Ayrshire
Council has ownership and
responsibility for their depots. 
16
Development
Control – Road
Bonds
Inadequate coupon
values of Road Bonds
exposes the Roads
Authority to a potential
shortfall if the roads works
have to be completed by
them in the event that a
developer defaults.
The coupon value of Road Bonds
that are more than three years old
are reviewed to determine their
adequacy.  Where a shortfall is
identified, the developer will be
advised to increase the value of the
Road Bond held when an application
is made for an extension to the Road
Construction Consent (RCC), which
is normally valid for three years. 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
If the road authority is
required to complete a
development road then only
the cost up to the value of
the Road Bond can be
recovered from the provider. 
Any shortfall has to be met
by the roads authority.  A
complete review of the
process of delivering road
bonds has been completed 
30/1/26 
17
Bridges and
Structures
Inadequate inspection
and maintenance of
structures, bridges and
culverts due to aging,
increased live loads,
cracking corrosion,
environmental effects
(freeze and thaw cycles)
and fatigue
Rolling programme of repair,
rehabilitation or replacement (for
weak bridges) through Council
Capital Budgets. 
2 4  8 [C]
Bridges & Design
Manager
Head of Roads
– Ayrshire
Roads Alliance
Bridges and culverts are
defined as structures with a
span in excess of 900mm.  30/1/26 
18 
Flooding Receipt of less Grant
Aided Expenditure
funding than anticipated
for flooding mitigation
schemes administered by
SEPA.
Potential lack of sufficient
funding for flooding
mitigation schemes if cost
of schemes exceeds
Grant Aided Expenditure
(GAE) due to Relief
Events or Force Majeure.
Seek capital funding from Council(s)
to bridge funding gap for flooding
mitigation schemes declared in Flood
Risk Management Plan. 
2 4  8 [C]
Bridges & Design
Manager
Head of Roads
– Ayrshire
Roads Alliance
The Councils have a legal
duty under the Flood Risk
Management (Scotland) Act
2009 to implement flooding
mitigation schemes declared
in the Flood Risk
Management Plan. 
Only 80% of principal funding
for flooding mitigation
scheme.  However increased
costs due to relief events or
force majeure is not funded 
30/1/26
36

Page 37

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review 
19
Financial Potential swift decline in
value of Pound Sterling
due to Force Majeure or
material adverse change
resulting in increased
costs in terms of fuel
prices, interest rates and
insurance premiums.
Mitigation measures would be put in
place to prioritise front line services
as detailed in the specific Business
Continuity Plans for office, depot and
harbour, as applicable 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk.  The impact
of the United Kingdom exit
from the European Union has
still to be evaluated.  On-
going discussions with
Transport Scotland, COSLA
and Ayrshire Roads Alliance
on the impacts on the
transport network. 
30/1/26 
20
Contractual
Agreement
Potential swift decline in
value of Pound Sterling
followed by market
volatility over the short to
medium term resulting in
suppliers and contractors
terminating agreements
due to Force Majeure or
material adverse change.
Mitigation measures would be put in
place to prioritise front line services
as detailed in the specific Business
Continuity Plans for office, deport
and harbour, as applicable. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk.  The impact
of the United Kingdom exit
from the European Union has
still to be evaluated.  On-
going discussions with
Transport Scotland, COSLA
and Ayrshire Roads Alliance
on the impacts on the
transport network. 
30/1/26 
21
GDPR  The existing Data
Protection Act 2018 was
brought about by the
General Data Protection
Regulation (GDPR) which
is an EU Regulation that
sets out the changes that
the UK will implement in a
new Data Protection Act.
Follow Corporate Procedures 
3 3  9 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
22
Presence of Coal
Tar within the
carriageway
networkimpac
Coal Tar is a known
material used in the
construction of
carriageways until the
mid-80s and is now
known as a carcinogen
and hazardous waste
material.
Reduce the level of risk by coring all
works prior to design.
Ensure an appropriate solution within
the design is prepared which is either
to retain in-situ and record presence,
or remove and dispose of in
accordance with current guidelines. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk; Ayrshire
Roads Alliance has a duty of
care to all employees in
accordance with the Health
and Safety at Work Act
1974,Construction Design
and Management
Regulations 2015 and the
disposal of hazardous waste. 
30/1/26 
23
Service The impact of the United
Kingdom exit from the
European Union
Mitigation measures are in place to
prioritise front line services as
detailed in the specific Business
Continuity Plans for office, depot and
harbour as applicable. 
4 3  12 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed risk.  Ongoing
discussions with Transport
Scotland, COSLA and
Ayrshire Roads Alliance on
the impacts on the transport
network. 
30/1/26 
24
Transport Increased cost of vehicle
maintenance due to lack
of investment in fleet
replacement
To mitigate the risk of increased
maintenance costs through lack of
fleet investment a comprehensive
maintenance programme is in place
for all vehicles in addition to a vehicle
replacement programme developed
to identify the optimum life cycle for
fleet. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   
30/1/26
37

Page 38

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review 
25
Transport Loss of operational base
for any reason
(Crookedholm Depot)
To mitigate the impact of the loss of
the transport depot and garage,
business contingency plans have
been developed that highlight how
and where office based staff will work
in addition to the steps to ensure that
maintenance is undertaken, which
would be to activate external
maintenance frameworks. 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   
30/1/26 
26
Transport Loss of public utilities for
an extended time
including electricity and
water.
Business continuity plans are in
place to allow for the whole service to
continue to function in the case that
utilities are lost for an extended
period of time. 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
27
Transport Loss of confidential
information and
appropriate handling of
information will lead to
breaches of data
protection and potential
significant financial
penalties being incurred
by the Council
All staff that handle personal details
have undertaken e-learning to advise
of appropriate data protection steps
required and where appropriate
electronic systems are in place for
recording and management of
personal data to avoid paper being
lost or misplaced. 
1 4  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
28
Transport Passenger transport –
late / non-attendance /
vehicle breakdown by pick
up vehicle – Failure of
service as Service as user
would miss Transport link
connection / arrives late at
destination activity / part
activity
The delivery of passenger transport
is managed on the Council’s behalf
by SPT.
If there is an issue where there is a
failure in service provision SPT would
be required to organise a
replacement service, working in
conjunction with Officer locally within
EAC. 
2 2  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
29
Transport Passenger transport –
escort not in attendance
ASN contracts / Council
owned vehicles service
failure.  Service not able
to be provided until escort
arrives.  Server user
misses activity / part
activity  
Should an escort not be available
H&SC services would arrange to
provide another responsible
individual available to ensure that the
service can be delivered.
In the unlikely case this cannot be
accommodated, the parent would be
notified and alternative arrangements
made for the transport of the child to
the school. 
1 4  4 [T]
Strategic      
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
30
Transport No driver available to
deliver service due to
annual leave / sickness
absence. Service not able
to be provided service
Any shortage of driver would result in
arranging for an alternative qualified
individual within transport services to
drive, or to work with Coalfield
Community Transport to deliver the
service. 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26
38

Page 39

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
user misses activity / part
activity 
31
Transport Passenger transport :
Emergency closure of
schools and contractors
unable to provide
transport within relevant
timescales - 
Should schools need to close
unexpectedly, all parents will be
contacted to request that children are
collected ASAP.  Teachers will
remain with children until the last one
has been collected safely by a
parent. 
1 4  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
32
Transport Passenger Transport:
Documentation out of
date risk to service users. 
Potentially inappropriate
individuals, inappropriate
vehicles used being used
to provide service 
Documentation is reviewed and
approved on an annual basis to
ensure that the correct data is held
for pupils, parents, schools and
transport operator information.  1  5  5 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26 
33
Transport Passenger Transport:
Contractor unable to fulfil
obligations due to
bankruptcy etc.  Service
failure not able to be
provided until alternative
arrangements made. 
Server user misses
activity / part activity
SPT manage all transport on behalf
of EAC.  In the case of a contractor
going out of business, an alternative
contractor will be sought.  Where this
cannot be provided, parents will be
contacted and alternative
arrangements may need to be made
for the provision of transporting
school children such as providing a
mileage allowance to parents until an
alternative solution can be
implemented. 
1 4  4 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   30/1/26
34 EV Charging Tariff Negative feedback to both
authorities
On approval by Cabinets a full
programme of public communication
to be issued
2 3 6[R] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   16/2/24
35 Material Shortages
and Price Increases
Steel products, timber,
electrical equipment and
aggregates have seen a
price increase with
aggregates prices falling
back in the spring.
This is as a result of
market cost increase of
raw material affecting
suppliers, supply chains,
shipping, transportation
and Construction costs. 
Increased admin at UK
ports due to EU Trade
Cooperation has resulted
in increased
Where there are problems we are
working with supplier to optimise
deliveries to get procure best value
under the circumstances.
4 3 12 [C] Strategic
Manager
Head of Service
– Ayrshire
Roads Alliance
This will be under constant
review with contractors. 
30/1/26
39

Page 40

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
transportation costs, raw
materials and surcharges.
36 Storage Related
Risks
Theft / Damage of Stores Risk is very low as there are many
measures that have been put in
place.  For example – CCTV
cameras, secure entry to the depots,
insurance covers all depots for theft /
damage, robust store person / key
holder procedures in place
1 4 4 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   
30/1/26
37 Ash Die Back Potential for death or
injury as a result of ash
dieback related accidents,
both to professionals
working on trees, and to
the general public
Increased safety issues
due to declining ash trees
on roads, owned and
managed land such as in
county parks, housing,
estates, schools, routes to
school, active travel
routes and other well-
used paths
Risks to statutory
functions or service
delivery such as retaining
safe schools, public open
spaces or roads
Risks to staff and
community from trees on
adjacent land falling into
your estate
Ash Trees within the public network
with a fall range will be inspected and
prioritised.
P1 Immediate Felling
P2 Monitor and Fell if moved to P1
P3 Monitor and Fell if moved to P1
Private landowners will be advised of
any trees within their land which
could impact on the public network.
Under Road Scotland Act 1984 ARA
have the authority to pursue
landowners and remove diseased
trees and recharge
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   
30/1/26
38 Ukrainian Crisis /
Middle East Crisis
Increasing cost of bitumen
and the potential of short
supply due to Russian
sanctions and increased
costs.  May also result in
rising fuel and delivery
costs
Pre-programming with suppliers and
contractors as well as monitoring
through revenue period reviews.
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   30/1/26
39 Fuel - Red Diesel  No longer permitted to
use red diesel within
construction vehicles.
This has an impact on
project costs and the
overall programme.
Reviewing alternative forms of fleet,
however, this brings additional cost.
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   30/1/26
40

Page 41

Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
40 EV Charging
concession contract
Failure to attract a private
partner
Robust and detailed tender package
to be issued through the procurement
process
2 3 6[T] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   30/1/26
41 Energy Costs
fluctuation
Impact on revenue
budgets
Robust period review of energy costs
for lighting and EV chargers.
3 3 9[C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance 
30/1/26
42 Land acquisition
and other legal
resource
requirement
Lack of available
resources resulting in
delays to projects
Triage projects at regular update
meetings. Consider outsourcing
Legal work.
4 3 12 [T&R] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance 
19/05/25
43 Procurement Scotland Excel Contract
Framework delays
Review alternative Frameworks to
procure Material and Services  5  3  15 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Alternative Framework
documentation would be
significantly different from
SXL.  Additional staff time
may be require to complete. 
30/1/26
44 United States
Trade Agreement 
This is as a result of
market cost increase of
raw material affecting
suppliers, supply chains,
shipping, transportation
and Construction costs. 
Where there are problems we are
working with supplier to optimise
deliveries to get procure best value
under the circumstances.
4 3 12 [C] Strategic
Manager
Head of Service
– Ayrshire
Roads Alliance
This will be under constant
review with contractors.  30/1/26 
41

Page 42

Official
AYRSHIRE SHARED SERVICE JOINT COMMITTEE
13 March 2026
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________
SUBJECT: ROADWORKS PROGRAMME 2025/26
______________________________________________________________
Purpose of report
1. The purpose of this report is to advise the Joint Committee on the progress of
work through the road improvement programmes within East Ayrshire and South
Ayrshire for financial year 2025 to 2026.
Recommendations
2. It is recommended that Joint Committee:
(i) Notes, the Ayrshire Roads Alliance programmed works 2025/26
(ii) Otherwise, notes the contents of this Report.
Background
3. The budget allocation for East and South Ayrshire Councils Roads Investment
Programme for FY 2025/26 can be seen in tables 1 and 2 below respectively.
Table 1: East Ayrshire Council Roads Investment Programme 2025/26
Programme Area Budget
(£m)
Carriageway Resurfacing 2.081
Footway Resurfacing 0.084
Street Lighting 0.215
Traffic & Transportation incl. road safety 0.330
Active Travel 0.050
School Streets 0.050
Bridge and Culvert Strengthening (incl. road slips) 3.500
Car Parks incl. Multi-storey demolition 0.820
Fleet 0.600
Total 7.730
External Funding
SPT – Behaviour Change 0.385
Transport Scotland – Behaviour Change 0.116
ATIF Tier 1 – General Active Travel Infrastructure Projects 0.758
Developer Contributions/Route Action Plans 0.359
Bus Infrastructure Fund – Tier 1 0.645
SG – EV Infrastructure Fund 2.800
Sustrans – Annick Valley Stage 2 0.165
Agenda Item 5
42

Page 43

Official
Road Safety Improvement Fund 0.359
Total 5.587
External Funding (Provisional Acceptance) 
ATIF Tier 2 – MSCP Redevelopment - Construction 1.800
ATIF Tier 2 – KGIL Design 0.795
Total 2.595 
Table 2: South Ayrshire Council Roads Investment Programme 2025/26 
Programme Area Budget
(£m)
Carriageway & Footway Resurfacing 1.581
Street Lighting 0.150
Bridges Capital 0.881
Millennium and Craigholm Bridges 0.145
C12 Dunure slope stabilisation 0.130
Vehicle restraint barriers 0.073
Cattle grid renewal 0.033
Girvan Harbour Jetty repairs 0.504
Local Flood Risk Plan 0.153
Ayr Depot 0.250
Climate Changes St Ninians Park 0.255
EV Charging Infrastructure 0.281
Total 4.436
External Funding  
SPT – Behaviour Change 0.170
Transport Scotland 0.116
ATIF Tier 1 – General Active Travel Infrastructure Projects 0.737
ATIF Tier 2 - Dundonald – Barassie 3.050
Ayrshire Growth Deal 0.857
Levelling Up Fund (Active Travel) 4.000
Levelling Up Fund (Burns Statue) 15.000
Bus Infrastructure Fund – Tier 1 0.382
Sustrans – Accessible Ayr 0.799
Sustrans – Girvan to Grangeston 0.041
Road Safety Improvement Fund 0.315
Total 25.467
External Funding (Provisional Acceptance) 
ATIF Tier 2 – Loans to Troon 0.378
ATIF Tier 2 – Prestwick to Barassie 0.780
AGD Southern Access Road 1.000
Total 2.158 
Main report/main issues 
4. Surfacing programmes for financial year 2025/26 are contained within Appendix
1 and 2.
43

Page 44

Official 
Capital Resurfacing 
5. The Capital budget for both authority areas is committed, with surfacing works
ongoing although unfavourable weather conditions may be carried over into
financial year 2026/27. 
South Ayrshire 
6. In South Ayrshire ARA have completed 95% of the carriageway resurfacing
programme with an anticipated completion date of March 2026.   
7. The footway resurfacing programme commenced in August 2025 and was
completed November 2025.   
8. The remaining carriageway and footway sites identified for resurfacing will be
carried over into financial year 2026/27 as detailed in Appendix 2. 
East Ayrshire 
9. In East Ayrshire 73% of the carriageway resurfacing programme has been
completed. Due to ongoing and further programmed utility works on the road
network and two sites requiring stage 2 testing for coal tar, eight sites will be
carried over into 2026/27.   
10. Footway works are currently ongoing, and it is anticipated there will be an
underspend which will be carried over into 2026/27 programme, this is due to
utility clashes and one site indicating traces of coal tar which also requires further
stage 2 analysis.  It is anticipated 45% completion by the end of the financial
year. 
11. Carriageway and footway schemes are further detailed in Appendix 1. 
East Ayrshire Council Residential Road and Footway Repairs 
(Additional Revenue Funding) 
12. At Cabinet on 13 March 2025, East Ayrshire Members Initiatives approved £800k
revenue funding for residential and footway repairs with locations identified
detailed within Appendix 1 of this report with 75% complete to date with the
remainder of the sites being moved into 2026/27 Capital carriageway and
surfacing programme due to utility clashes and budget maximised. 
South Ayrshire Council Ward Investment and Promenade Programme
2025/26 
13. Officers within our engineering disciplines continue to develop work schemes
identified by Ward Members under the South Ayrshire Council Ward and
Promenade Investment Programme as detailed within Appendix 4 of the report. 
44

Page 45

Official 
Timber Transport 
14. As reported at the last joint committee In December 2025, ARA expressed and
interest for any unallocated funding from Timber Transport to be redistributed. 
Funding was offered late January 2026 which was accepted with works on the
C1 Newton Stewart Road in South Ayrshire commencing on site at the beginning
of February 2026. 
15. Officers are committed in partnership with Timber Transport Consortium in both
authority areas and it is our intension to submit bids for surfacing schemes when
the window opens for 2026/27 applications. 
Street Lighting 
16. The street lighting column and cable replacement programme of works which
incorporates LED lanterns is detailed in Appendix 1 and 2. 
17. Our 2025 festive lighting programme was completed successfully with
installations being undertaken both our inhouse lighting team and appointed
external contractor. 
18. The Scotland Excel (SXL) Street Lighting Material Framework has still not been
issued and this is hampering the completion of the LED project in the East and
material procurement in general.  YPO ‘Highway Electrical Installations’
procurement framework is the only mechanism available.  Material items not
available via ‘direct award’ must be procured via Mini Competition tendering
which is an added delay.   
Electric Vehicle Infrastructure 
19. The Electric Vehicle Infrastructure Fund (EVIF) programme with the number of
public chargers installed to date is listed within Appendix 3 for South and East
Ayrshire respectively. 
20. Work is progressing in the tendering stage for the Pan Ayrshire Concession
Contract. The procurement phase began with the appointment of Mott
MacDonald as the consultants to assist with the collation of the relevant
documents required for tender. The Single Procurement Document (SPD) was
issued on 3rd March 2025 for the initial stage of tendering, following which we
received numerous bids, and shortlisted 7 bidders. The second part of the
tendering process is currently ongoing, with the Invitation to Tender (ITT)
published to the shortlisted bidders on 3rd October 2025.The deadline for tender
submission was 7th January 2026. Subject to evaluation and approval by the
Ayrshire Authorities, the contract award is anticipated in March 2026. 
21. Replacement of the 22kW charger at Troon Swimming Pool will be funded from
SAC Capital budget but is on hold until the concession contract is awarded in
Feb/March 2026. 
45

Page 46

Official 
Structures 
22. Land acquisition and/or access agreements alongside environmental license
requirements continue to cause delays to a number of projects. ARA are working
closely with EAC Legal/Estates and relevant stakeholders to progress these
issues. 
23. Appendix 1 details the East Ayrshire Council bridges capital programme for
2025/26. 
24. A713 Polnessan Upper Bridge - ARA have erected temporary traffic signals due
to subsidence in the carriageway. Traffic lights will remain in place until the slope
has been stabilised. Contract documents are currently being reviewed by
Procurement. Land agreements have been finalised. Awaiting SEPA License. 
25. B741 Coal Glen Embankments - works to be retendered early 2026 following
discussion with SPEN regarding utilities in the vicinity of the works. 
26. ARA are working with EAC Legal/Estates to acquire land at West Clerkland
Bridge through a Compulsory Purchase Order. The bridge has been shut to
vehicular traffic since 2012 and shut to both pedestrians and vehicular traffic
since 2021. 
27. Three bridges on the A71 between the Bellfield Interchange and Moorfield
Roundabout need replacement expansion joints. A consultant was appointed to
explore options in removing the joints and making the structures semi/fully
integral. It has been decided that in the meantime two joints that are repeatedly
failing will be replaced with asphaltic plug joints. 
28. B730/10 Littlemill Bridge - land acquisition complete after years of negotiation.
Tender documents to be reviewed by consultant once SXL consultancy
framework is live (anticipated to be April 2026). 
29. U13 Aitket Road Slip – Works started on site in January 2026. Works going well. 
30. South Pier Quay at Girvan Harbour works have commenced on site January
2026 and is anticipated to be completed by April 2026.   
31. The budget transfer was approved by cabinet. A capital business case will be
submitted in October 2026 for funding for the construction phase of the Girvan
Harbour Timber Jetty Project. 
32. The A79/30 Victoria Bridge Concrete Repairs and Painting has been completed. 
Additional abutment concrete repairs was identified as the scaffolding was
coming down. These commenced in mid-February 2026. 
33. The Contract Documentation for Girvan Harbour dredging and land-based
material disposal has been finalised and is with Procurement for Tender issue. 
ARA have been exploring the option to engage Moray Council who have their
46

Page 47

Official
own dredger and have indicated they can dredge from June 2026 which ARA is
considering with open Tendering still an option.  No dredging can take place from
mid-March until June 2026 as there are restrictions due to migratory fish season 
34. The sink hole at Ayr South Pier has been repaired as it was compromising the
stability of the public road.  Discussions are ongoing with South Ayrshire Council
to identify budget for the underwater dive survey and structural assessment 
35. A land slip has occurred on the C13 near Penkill Castle South East of Old Dailly. 
Temporary barriers have been erected and a monitoring programme established. 
Scottish Power have carried out temporary cable protection works. Funding for
carrying out slope stabilisation work is being explored. 
36. A significant landslip has occurred on the C11 Kirkmichael to Patna Road which
is being monitored. Funding for carrying out slope stabilisation work is being
explored. 
37. A minor landslip has occurred on the C1 at Laggan near Ballantrae existing
budgetary provision will be utilised to carry out repairs. A contractor has been
appointed for these works. 
Traffic & Transportation 
38. Active Travel Infrastructure Fund (ATIF) Tier 1 grant funding for both authority
areas has been received from Transport Scotland.  Active Travel projects using
the Tier 1 funding are currently being progressed and will be implemented over
the coming months. The ATIF Tier 1 funding is unusual in that it does not require
to be fully spent by the current financial year end – several elements of work in
the vicinity of schools are therefore likely to be scheduled during the summer
holidays where traffic flows are generally lower, and less children likely to be in
the vicinity of live works sites. 
39. Grant awards have been confirmed from Transport Scotland (TS) for both EAC
(£645,000) and SAC (£382,000) from the Bus Infrastructure Fund – Tier 1. This
unforeseen funding is directly awarded and paid to local authorities as part of the
General Capital Block Grant (GCBG) allocation. ARA are working hard to deliver
against the funding allocated, however given the lack of advanced notice of the
grant award, and that a full financial year was not afforded to ARA (awards
granted in August, but require to be spent by FY end) we are reporting a
proportion of underspend against this grant. A request was raised with Transport
Scotland to accrue the grant monies beyond the current financial year; however,
it has been confirmed there is no scope for carry-over and spend needs to be
completed by financial year end. The ARA are making every effort to maximise
spend against grant funding within the timeframe available. 
40. Grant awards have been confirmed from Transport Scotland for both EAC
(£359,000) and SAC (£315,000) from the Road Safety Improvement Fund
(RSIF). Schemes are currently being progressed as listed in the appendices. 
47

Page 48

Official
41. Kilmarnock Bus Station refurbishment programme is now complete with officers
currently reviewing the cleaning regime. 
42. The contracts for Cumnock Bus Station which include changes to materials and
the installation of a public address system are currently being prepared. The new
materials to replace damaged glass panels are due to be installed by March 2026
with the public address system to follow in March/April 2026. 
Ayrshire Growth Deal (AGD) Roads Projects 
43. A Case for Change seeking approval of the changes to the roads infrastructure
project and also the Prestwick Proposition has now been approved by Scottish
& UK Governments. Ayrshire Roads Alliance will assist in the delivery of all these
projects for South Ayrshire Council. 
44. A Planning application for the construction of a new car park at Shaw Road,
Prestwick will be submitted in March 2026. 
45. Extensive ground investigations and environmental studies are have been
undertaken on the remaining phases of the AGD in an attempt to accelerate the
design process and move more projects through to construction. 
46. The ARA will deliver airside improvements to support the commercial build
including the construction of a new bridge over the Pow Burn.. 
47. An extension to Shawfarm Road will also be delivered to support the commercial
build. 
Levelling Up Fund 
48. South Ayrshire Council successfully secured £20M of funding from the Levelling
Up Fund (LUF) round three. £15M of this funding has been transferred to ARA
and will be utilised to redevelop Burns Statue Square, Ayr. Balfour Beatty are
due to be appointed as the principle contractor, design is currently underway and
a delivery programme will be produced in March 2026. 
49. £1.2M of the LUF funding along with a £3.05M award from ATIF will be used to
construct a new Active Travel Route linking Dundonald to Barassie Station, work
is currently underway on this route and is scheduled to be complete by 31 July
2026. 
50. The remaining £2.8M along with funding from the AGD and a bid to the ATIF in
December 2025 will be utilised to carry out significant improvements to the NCN7
from Prestwick to Barassie railway stations. Work will commence on-site late July
2026 and will be complete by 31 March 2028. 
48

Page 49

Official
Active Travel 
51. The Active Travel Infrastructure Fund (ATIF) administered by Transport Scotland
has awarded £3.05M towards the construction of the Dundonald to Barassie
route. 
52. ARA has submitted several funding applications to ATIF in January 2026 to carry
out the next stages of the design process for several active travel routes across
both South and East Ayrshire Council. Decisions on these applications are
expected by 31 March 2026. 
Ash Dieback & Other Species 
53. Appendix 5 of the report details the current condition data on all High Risk
roadside trees for both authority areas.  Surveys and programmed works for
removal are ongoing with 28-day notices being issued to owners and any
objections received referred to legal service. 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning x  54 & 55
2. Governance x  56
3. Human Resources x  57
4. Equality and Fairer Scotland Duty x  58
5. Financial x  59
6. Risk x  60 & 61
7. Community Wealth Building x  62
8. Net Zero x  63 
Policy/strategic planning implications 
54. A well-maintained road network will contribute to achieving the 2015-2030
Community Plan objectives and associated 2021-2024 Delivery Plans 
55. The matters referred to in this report contribute to Priority 1 of the South Ayrshire   
Council Plan: Spaces and Places / Moving around and the environment
(Outcome 1). 
Governance implications 
56. By virtue of the relevant statutory provisions, principally detailed within the Roads
(Scotland) Act 1984, the Council as local roads authority is required to manage
and maintain all publicly adopted roads within its area other than those which are
maintained and managed by the Scottish Ministers. 
49

Page 50

Official 
Human resources implications 
57. The work programmes have direct impact on human resources and the Alliance  
will ensure all works are suitably resourced to maintain satisfactory progress. 
Equality impact and Fairer Scotland duty implications 
58. Equality Impact and Fairer Scotland Duty screening assessments will be
undertaken annually as required during the planning stage prior to the delivery
of the programme of works. 
Financial implications 
59. The Ayrshire Roads Alliance will deliver the strategic and local services as stated
in the Service Plan. The budget is provided by East Ayrshire Council, South
Ayrshire Council, and other external organisations. Appropriate scrutiny
arrangements are in place to manage these budgets and programmes are
detailed within the appendices. 
Risk implications 
60. The Ayrshire Roads Alliance Risk Register is reviewed and presented at every 
Joint Committee. 
61. The Works Programmes, Service Plan and the Risk Register do not expose
either Council to an increased risk as they have been developed from existing
budgets and existing service commitment. 
Community Wealth Building implications 
62. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people. 
Net zero implications 
63. The Ayrshire Roads Alliance Service Plan and Carbon Strategy supports and
links to East Ayrshire Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment  
50

Page 51

Official 
Appendices 
Appendix 1 EAST AYRSHIRE COUNCIL PROGRAMMES 2025/26
Appendix 2 SOUTH AYRSHIRE PROGRAMMES 2024/26
Appendix 3 EV PUBLIC CHARGERS
Appendix 4 SAC WARD INVESTMENT & PROMENADE PROGRAMME 25/26 
Appendix 5 ASH DIE BACK REPORTS 
Background papers 
EAC Road Asset Management Plan 2025-2026 
SAC Road Improvement Plan 2025-2026 
Person to contact 
Name:  Jane Corrie, Head of Roads - Ayrshire Roads Alliance
Tel:   01563 503164  
Email:  jane.corrie@ayrshireroadsalliance.org 
Implementation Officers 
Name:  Craig Knape, Strategic Manager - Ayrshire Roads Alliance
Tel:  01563 503164 
Email:  craig.knape@ayrshireroadsalliance.org 
Name:  Barrie McDonnell, Strategic Manager – Ayrshire Roads Alliance
Tel:   01563 503190
Email:  barrie.mcdonnell@ayrshireroadsalliance.org
51

Page 52

Official
Appendix 1 
EAST AYRSHIRE COUNCIL PROGRAMMES 
EAC Carriageway Structural Maintenance Programme 2025/26 (incl works carried over from 2024/25) 
ROAD LOCATION Estimated
Cost
Cost to Date variance +/- Comment
A71 Dual Carriageway  From Moorfield Roundabout – Target Worst Sections £300,000.00
£525,940.49 -£225,940.49 Complete – final
measure
A736/U20 Junction
Contribution to North
Ayrshire to complete
EAC section
Junction Contribution to North Ayrshire to complete
EAC section
£15,000.00 
Complete – final
measure
A735 Lochridge House From Lochridge House North Entrance to Windmill
factory Farm
£182,354.25 
Due to
ongoing/programmed
Scottish Water Works
these works will be
carried over into
2026/27
A735 Rigg Street
Stewarton From B778 to Brown Street £60,606.00 
Due to
ongoing/programmed
Scottish Water Works
these works will be
carried over into
2026/27
B7046 Skares From Junction Newfield Rd to Recycling Centre
Additional section into Skares £116,000.00 £158,459.05 -£42,459.05 Complete – final
measure
B769 Stewarton  From Stewarton to North Ayrshire Boundary
£219,375.00 
Due to
ongoing/programmed
Scottish Water Works
these works will be
carried over into 2026-
2027
B743 Mauchline High
Street From A76 to Loans (School) £52,680.60  
Complete – awaiting
final measure
B7037 Titchfield
Street Galston From Mini Roundabout to Orchard Street £97,500.00  
Complete – awaiting
final measure 52

Page 53

Official
B7083 Kilmarnock
Campbell Street From: Fire Station AC / To: Willock Street                  
£41,595.40 
Contractor fully
committed.  Carried
forward to 2026/27
C3 Barskimming Road
Mauchline From Loudoun Street to StationRoad £74,074.00  
Complete – awaiting
final measure
C108 Stewarton From Greensland to Boundary £114,750.00  
Carried forward to
2026/27
C22 Coal Road
Auchinleck From Railway bridge to Barbieston Road £35,612.50  
Complete – final
measure
U55 Galston  From U56 approx 1000m Westwards £78,750.00
£63,166.81 +£15,583.19 Complete – final
measure
Kilmarnock New Mill
Road From Chapmans Terrace to end £45,584.00  
Complete – final
measure
Kilmarnock Whatriggs
Road From Tinto Avenue to Haining Avenue £35,612.50  
Complete – final
measure
Kilmarnock East Shaw
Street From Lidle to and around mini roundabout £37,814.00  
Complete – awaiting
final measure
Kilmarnock Bentink
Street On Approach to Mini roundabout £20,797.70  
Complete – awaiting
final measure
Kilmarnock Bellsland
Grove Full Length £19,080.00  
Complete – awaiting
final measure
Kimarnock Beech
Avenue From Portland Road to Larch Place
£84,501.40  
Programmed for the
Easter School Holidays
2026.
Kilmarnock Pine Road Full Length £42,022.75  
Complete – awaiting
final measure
Kilmarnock Old Irvine
Road From Lindsay Street to Grange Street £37,464.35  
Complete – final
measure
Kilmarnock
Brackenhill Avenue Full Length  £32,323.20  
Complete – final
measure
Kilmarnock Arran
Avenue  Full length  £36,182.30  
Complete – final
measure
Kilmarnock Lainshaw
Avenue One Section £71,225.00  
Complete – final
measure
Kilmarnock Townend
Road Full Length £27,065.50  
Complete – final
measure
Stewarton Avenue
Square Access Road into car park £11,396.00  
Complete – final
measure
53

Page 54

Official
Kilmaurs East Park
Crescent Full Length
£34,045.55  
Stage 2 testing
required.  Carried
forward to 2026/27
Galston Western
Road Outside Primary School £29,487.15
£41,771.61 -£12,284.46 Complete 
Hurlford Mayfield
Avenue Full Length £57,855.42  
Complete – final
measure
Fenwick Skernieland
Road From Old A77 Slip to Rysland Terrace
£44,053.31  
Stage 2 testing
required.  Carried
forward to 2026/27
Cumnock Hearth
Road Full length £89,909.25  
Complete – final
measure
Drongan Lane
Crescent Full Length £27,195.00  
Complete – final
measure
Bellsbank Corserene
Terrace Full Length £29,526.00  
Complete – final
measure
Dalmellington
Gateside Road Broomknowe to B741 £31,080.00  
Complete – final
measure
Dalrymple Cedar
Terrace  Full Length £15,540.00  
Complete – final
measure
Drongan Mill o Shield
Road From Coyle Avenue and Garrowhill Drive £37,749.25  
Complete – final
measure
A70  Dumfries House £180,000.00  
Complete – final
measure 
EAC Footway Structural Maintenance Programme 2025/26 (incl works carried over from 2024/25) 
FOOTWAY LOCATION Estimated Cost Cost to Date variance +/- Comment
Catrine - Newton
Street Outside School £7,290.00  
Complete –
final measure
Auchinleck - Main
Street From Surgery to Council Car Park £21,870.00  
Complete –
final measure
Cumnock -
Glaisnock Road Outside Cemetery £19,044.00  
Complete –
final measure
Kilmarnock -
Dundonald Road Outside School £16,200.00 
Carried
forward to
2026/27
54

Page 55

Official 
EAC £800k Residential Carriageway/Footway Improvement Programme 2025/26 
WARD Location Estimated
Costs
Cost to Date Variance +/- Comment 
1
Carriageway - Stewarton Dornie Close  £9,120.00   Complete – final measure
1 Carriageway - Stewarton Braemore Road £11,310.00   Complete – final measure
1 Carriageway - Stewarton Kirkmuir Drive £54,000.00   Complete – final measure
Kilmarnock -
Gilmour Street Various Locations £21,060.00 
Carried
forward to
2026/27
Stewarton - High
Street From Old Bank to Church £16,200.00  
Due to
ongoing/progr
ammed
Scottish Water
Works these
works will be
carried
forward to
2026/27
Stewarton -
Lainshaw Street Standalane to Sainsbury’s Rear Entrance £19,260.00 
Due to
ongoing/progr
ammed
Scottish Water
Works these
works will be
carried
forward to
2026/27
Fenwick - Skerniland
Road Both Sides £22,680.00 
Stage 2 testing
required. 
Carried
forward to
2026/27
Galston - A719
Opposite Loudoun
Academy From Nursing Home to Barriered Section £8,100.00 
Complete –
final measure
55

Page 56

Official
2 Carriageway - Kilmarnock Tourhill Road £5,580.00 £19,433.99 -£13,853.99 Complete – final measure
2 Carriageway – Kilmarnock Auchencar Drive £15,120.00 £19,463.81 -£4,343.81 Complete – final measure
2 Carriageway – Kilmarnock Wardneuk Drive £6,165.00 £9,932.66 -£3,767.66 Complete – final measure
3 Carriageway - Kilmarnock Woodside Avenue  £60,000.00  
Complete – final measure
4
Carriageway - Kilmarnock - Anderson Place/Bannerman
Drive and Drummond Place
£46,200.00 £8,409.74  Complete – final measure
4 Carriageway - Kilmarnock Sparrow Gardens £12,960.00   Complete – final measure
5 Carriageway - Kilmarnock Simonsburn Road £9,225.00   Utility works clash. Carried
forward to 2026/27
5 Carriageway - Kilmarnock Elderslie Crescent/Ayr Road £13,500.00   Utility works clash. Carried
forward to 2026/27
6 Carriageway - Newmilns Sheilds Road £28,050.00   Complete – final measure
6 Carriageway - Darvel West Donnington Street £16,800.00   Complete – final measure
6 Carriageway - Darvel Jaimieson Road £17,400.00 £22,124.59  Complete – final measure
7 Carriageway - Mauchline Clarinda Crescent    
Complete – final measure. 7 Carriageway - Mauchline East Park Avenue £56,460.00 £38,854.02 
7 Carriageway - Mauchline Southpark Avenue   
7 Carriageway - Mauchline Welton Road £63,450.00  £48,497.46   7 Carriageway - Mauchline Mansfield Road  Complete – final measure
8 Carriageway - Cumnock Latta Crescent £20,010.00   Complete – final measure
8 Carriageway - Cumnock Nans Terrace £16,500.00   Complete – final measure
8 Carriageway - Cumnock Lorimer Crescent £44,550.00   Complete – final measure
8 Carriageway - Cumnock Hearth Place £24,000.00   Complete – final measure
8 Carriageway - Cumnock Bank Avenue £21,420.00   Complete – final measure
8 Carriageway - Logan Holmhead Crescent £36,600.00   Complete – final measure
8 Carriageway - Logan Dixton Avenue £21,690.00   Complete – final measure
9 Carriageway - New Cumnock Castlemains Avenue £42,000.00   Carried forward to 2026/27
9
Carriageway - Dalmellington Church Hill/Melling
Terrace £36,330.00   Complete – final measure
9 Carriageway - Dalmellington Knowehead £41,820.00   Carried forward to 2026/27
9 Carriageway - Ochiltree Gallowlee Avenue £20,490.00   Carried forward to 2026/27
4 Footway – Hurlford Furnace Court £15,750.00   Carried forward to 2026/27
6 Footway – Galston Bridge Street £3,750.00   Carried forward to 2026/27 56

Page 57

Official
6 Footway – Darvel Glen Crescent £17,500.00   Carried forward to 2026/27 
EAC Lighting Capital Programme 2025/26 
Town Location Work Type No of
columns
Estimated
Programme Cost
Comments Variance +/-
Dalmellington Riecawr Ave, Area. Unreliable 5th Core. 22 £65,000 Completed
16 Jun 2025 3%
Galston Maxwood Road. Unreliable 5th
Core/Concrete columns. 10 £30,000 Completed
14 Jul 2025 6%
New Cumnock Highpark Ave, Area. Unreliable 5th
Core/Concrete columns. 19 £60,000 Completed 
27 Aug 2025 0%
Stewarton Lothian Rd, Area. Unreliable 5th Core 23 £60,000 Cancelled 
Kilmarnock Irvine Road Area. Column failures 8 £20,000 Completed
09 Oct 2025 
Patna Netherhill Crescent. Concrete Columns 8 £25,000 Completed 
17 Feb 2026 
£180,000 
EAC LED Lighting Programme Update 2025/26 (works carried over from 2024/25) 
Town Lantern
Amount Status Delivery /
start install Install complete by
Kilmarnock - Central 1400 In progress Mar 2024 Mar 2026
East Ayrshire - Decorative 350 75% complete 
tender to be awarded for next stage  Aug 2026 
EAC LED Lighting Programme 2025/26 
Programme completed conversions to date 15,267 Replacement programme 97% complete
Overall LED units completed 20,910 LEDs now 98% of total EAC inventory 
57

Page 58

Official
EAC Bridge and Culvert Strengthening Programme 2025/26 
Structure
Reference
Structure Name Proposed Works 2025/26
Estimate
Comments
Bridge Strengthening and Replacement    
A71/280 C80 Mathews Burn Culvert
West Donnington St,
Darvel
Slab Replacement £250,000 Internal design ongoing.
U751/10 Crossflats Bridge Replacement £40,000 Awarded to consultant to design replacement.
Temporary bridge will be required during the works.
U760/00 C93 Glenhead Bridge Replacement £60,000 Works awarded to contractor. Start date TBC.
U740/10 Barbieston Bridge Replacement £60,000 SAC leading design. Award to consultant.
Road Slips  
B713 South of Sorn  £400,000 Works complete.  
B741 Coal Glen Embankment Slip Remediation Works £690,000 Discussions ongoing with SPEN. Works to be
retendered ASAP
U13 Aitket Road Slip Remediation Works £500,000  Works started on site January 2026.
A713/60 C61 Polnessan Upper Bridge Culvert Extension £500,000  Contract docs with Procurement for review.
Upgrade Works Identified from Inspections  
B705/10 C91 Cowan Place Culvert Part Replacement/Scour
Repairs
£60,000 Near tender ready.
A70/130
W31
Thornwood Wall, Lugar Replacement £500,000 Near tender ready. Discussion regarding requirement
for road closure ongoing. Works to be postponed to
26/27.
A736/60 C84 Lochridge Culvert Masonry and Drainage
Repairs
£70,000 Works  Complete.
58

Page 59

Official
A71 Riccarton Viaduct Refurbish - expansion joint
removal/replacement
£100,000 Design ongoing to replace 1 failing expansion joint
with asphaltic plug joints. Works to be carried out
ASAP.
A71 River Irvine Bridge Refurbish - expansion joint
removal/replacement 
Design ongoing to replace 1 failing expansion joint
with asphaltic plug joints. Works to be carried out
ASAP.
C85/10 Fenwick Bridge Masonry Refurbishment £40,000 Award to consultant to progress with assessment and
detailed design.
U729/00 C64 Hayholm Bridge Masonry and Scour Repairs £60,000 Internal design ongoing.
C95/10 Furnace Road Bridge Arch Strengthening £100,000 Internal design ongoing.
Parapet Upgrades  
A70/110 Causeyhead Bridge Parapet Repairs £60,000 Discussions ongoing regarding options to reduce
disruption at Dumfries House.
A736/50 Bloak Road Bridge Parapet Repairs £30,000 NAC/EAC boundary, EAC progressing design. Contract
awarded.
Other  
Various Investigative Works Topographical Survey, Paint
Inspection etc
£8,000 Annual cost of surveys/inspections. 
Principal Inspection Consultant Fees £100,000 External PI’s complete
Various Low Bridge Signage  Sign Upgrades £40,000  Works near complete. 
59

Page 60

Official
EAC Traffic, Transportation and Road Safety Programmes 2025/26
Funding Source Project
ID
Location Project Description Detail Progress Allocation
EAC Capital Road Safety
Budget: £200,000
(£198,000 Road Safety +
£2,000 Safer Neigh.)
22.23 A71 / Campbell Street
Off Slip, Kilmarnock
Junction
signalisation
Installation of new
traffic signals, stopping
up of Willock Street
and new carriageway
layout to improve
capacity
Contractors fully
committed 
£105,000
Carried
forward
until
2026/27
22.50 B741 Dalmellington to
New Cumnock
Road safety
review
General route review
to identify safety
measures
Survey complete
with video
footage to be
reviewed
£2,000
22.38 Glaisnock Street,
Cumnock
Traffic calming Speed
reduction/traffic
calming measures
Works 90%
complete
£15,000
22.15 VAS signs, various
location
Upgrades and
new installations
New contract to be
implemented
In progress £10,000
25.20 A713 - Waterside  Road safety
improvements
40mph repeaters, HFS
gateway features and
road markings upgrade
Complete £25,000
24.05 Various Traffic calming Speed surveys Ongoing £10,000
25.03
/
25.16
Various Road safety
improvements
HFS Schemes Ongoing £33,000 
24.20 B751 – Kilmaurs to Fenwick  Route Review General route review,
VAS improvements,
Road Markings and
Signage, Studs
Works 90%
complete
£125,000
25.11 A71 – Priestland Safer system
improvements
Vehicle restraint
barriers
Complete £75,000
25.13 A719 – Waterside Road Safety
improvements
VAS improvements ,
HFS and carriageway
studs
Works complete £50,000
25.17 A70 – Dumfries House Road Safety
improvements
VAS improvements ,
HFS, carriageway studs
and resurfacing
Works
commenced –
compl;etion
March 26
£60,000
60

Page 61

Official
Rural Route Action Plans
Budget: £359,000
£134,000 (EAC) + £225,000
(Dev. Contributions)
22.08 B778 Stewarton to
Fenwick
Road alignment
improvements at
three key
locations
Agreement to proceed
with site 1
improvements
Process started £359,000
Tier 1
Budget: £758,000 
22.13 Grougar Road,
Crookedholm
Pedestrian
crossing and road
widening
Installation of new
crossing and layby
Complete  £99,000
23.07 Strawberrybank Road,
Kilmarnock
Pedestrian
crossing
Appraisal for new
crossing point
Ped counts low
so project
reduced to
consideration of
ped refuge island 
£10,000
23.10 St Germain Street,
Catrine
Pedestrian safety
improvements
Installation of bollards
and TRO 
Works complete
with TRO to be
finalised 
£10,000
N/A Kilmarnock Green
Infinity Loop
Cycling
Infrastructure
Route 1 & 2, Sturrock
St and MSCP
Route 1 & 2
design placed on
hold due to lack
of funding, MSCP
site
redevelopment
application
submitted to
ATIF 2025/26.
Sturrock St
modelling
completed. 
£100,000
24.18 A759 West of
Gatehead
Pedestrian
improvements
Footway designs and
build out
Works to be
reprogrammed
for 26/27 
£30,000
Carried
forward
until
2026/27
25.15 B751 Kilmaurs to
Knockentiber
Pedestrian
improvements
Footway
improvements
Works Started-
Planned
completion
March 2026
£30,000
61

Page 62

Official 
24.28 Kilmarnock - 
Dundonald Road and
Gargieston area
Pedestrian
improvements
Footway designs and
buildouts
Works to be
reprogrammed
for 26/27 
£30,000
Carried
forward
until
2026/27
23.12 A713 Bellsbank Rd,
Dalmellington
Traffic calming 1 x speed table Works to be
reprogrammed
for 26/27 
£10,000
Carried
forward
until
2026/27
25.12 A71 Priestland Traffic Calming and
pedestrian crossing
Works to be
reprogrammed
for 26/27 
£50,000
Carried
forward
until
2026/27 
Irvine Road Kilmaurs Pedestrian
improvements
Planned start 23rd
with carry over
into 26/27
£35,000 
Various location Various minor
works projects
To be Confirmed Works to be
reprogrammed
for 26/27 
£100,000
Carried
forward
until
2026/27
25.09 Altonhill Avenue Kilmarnock Traffic Calming and
road widening
Works to be
reprogrammed for
26/27 
£80,000
Carried
forward
until
2026/27 
Various Locations Pedestrian
improvements
Installation of new
crossing points and
improve existing
walking routes
Works to be
reprogrammed
for 26/27 
£160,000
Carried
forward
until
2026/27
24.25 Main Street Stewarton Pedestrian crossing
upgrade
Works to be
reprogrammed for
26/27 
£25,000
Carried
forward
until
2026/27 62

Page 63

Official
Tier 2
Budget: £2,595,000 
Foregate Mobility Hub Regeneration of
Foregate and
creation of
mobility hub
KGIL phase 1c & public
realm
Contract awarded
expected
completion date
of 31st March 2027
£1,800,000.
00 
Kilmarnock North Creation of a bi-
directional active
travel route
Detailed design of
Active Travel Route
Completion due
31st March 2026
£415,000.00 
Kilmarnock East Creation of a bi-
directional active
travel route
Detailed design of
Active Travel Route
Completion due
31st March 2026
£379,800.00
EAC Bus Infrastructure
Budget: £645,000
22.51 Onthank Terminus,
Kilmarnock
Upgrades to
existing
infrastructure
Improve crossing and
boarding points
Complete  £20,000
22.52 Stewarton Terminus,
Stewarton
Upgrades to
existing
infrastructure
Improve turning circle
and boarding points
Planned start End
of February 
£20,000 
Newmilns Road ,
Galston
Upgrade to
existing
infrastructure 
Installation of new bus
layby including shelter
Works to be
reprogrammed for
26/27 
£32,000
Carried
forward
until
2026/27 
Various locations Upgrade to
existing
infrastructure
Bus shelter upgrades
to various locations
Works to be
reprogrammed for
26/27
£85,000
Carried
forward
until
2026/27 
Newmilns Road ,
Newmilns
Upgrade to
existing
infrastructure 
Installation of new bus
layby including shelter
Works to be
reprogrammed for
26/27
£32,000
Carried
forward
until
2026/27 
Various Locations Upgrades to
existing
infrastructure 
Installation of bus
priority traffic signals
To be complete
Mar 2026
£155,000 
Irvine Road,
Kilmarnock
Upgrade to
existing
infrastructure 
Installation of new bus
layby including shelter
Works to be
reprogrammed for
26/27
£42,000
Carried
forward
until
2026/27 63

Page 64

Official 
Glasgow Road,
Kilmarnock
Upgrade to
existing
infrastructure
Relocation of bus stop
to improve use
including crossings
Works to be
reprogrammed for
26/27
£57,000
Carried
forward
until
2026/27 
Grassyard Road,
Kilmarnock
Upgrade to
existing
infrastructure
Installation of raised
kerbs to improve
access/egress onto bus
Works to be
reprogrammed for
26/27
£22,000
Carried
forward
until
2026/27 
TBC Land purchase Land purchase for
proposed park and
ride site
Works to be
reprogrammed for
26/27
£200,000
Carried
forward
until
2026/27
EAC Active Travel
Budget £50,000
24.03 School Streets
Programme
Introduction of
trial sites
Three further schools
to be trialled with
further trials to be
developed
Contractor
appointed to
undertake school
crossing
improvements.
Planned start date
May 2026
£50,000
Carried
forward
until
2026/27
64

Page 65

Official 
Appendix 2 
SOUTH AYRSHIRE COUNCIL PROGRAMMES 
SAC Carriageway Structural Maintenance Programme over two years 2024 to 2026   
Route
No
Town Road Name Works
Description
Scheme
Score
Estimated
Cost
Cost to
Date
Variance
+/-
Comments
B734 Old Dailly Barr Old Dailly Old Dailly to Penkill
+ drainage
improvements
N/A £150,813 £163,932  -£13,119 Complete 
B7035 By Girvan Glendoune Houdston
Road (Coalpots)
Braetoll South + S
Power shut down
N/A £200,000 £206,251 -£6,251 Complete 
B743 By Mossblown Ayr / Mossblown? West from
Brocklehill Farm
53 £249,002 £249,239 -£237 Complete
C37 Auchincruive Barrackhall Gibbsyard  48 £123,861 123,873 -£12 Complete
Uncl Tarbolton Springfield Road Garden Street to No
50
46 £54,275 £53,851 +£424 Complete
B742 By Coylton B742 Council Boundary -
A70/Hillhead, Coylton
By Holebogs, S bend 59 £445,000 £440,506 +£4,494 Complete
B742 By Coylton B742 Council Boundary -
A70/Hillhead, Coylton
From A70 at
Hillhead south to
C21 Craigs Road
junction
56
B742 By Coylton B742 A70 Hillhead - B744
Jcn N Of Annbank, Coylton
From Meadowhead
Depot entrance
south-wards
55 Complete
B742 By Coylton B742 A70 Hillhead - B744
Jcn N Of Annbank, Coylton
Bridge of Coyle to
C2
52
B744 Annbank Weston Brae Full Length 53 £152,000 £207,822 -£55,822 Complete
65

Page 66

Official
B744 Annbank Browns Crescent 
Weston Avenue
Full Length
Craighall Way to
101 Weston Avenue
53
56
U77 By Coylton Hole Road Full Length 46 £82,867 £83,064 -£197 Complete 
B7023 Maybole Crosshill Road Full Length 56 £74,687 £72,215 +£2,472 Complete
Complete
Complete 
B7023 Maybole St Cuthbert's Road Full Length 53 £30,669 £41,792 -£11,123
B7024 Maybole Alloway Road Redbrae to Bypass 51 £55,922 £96,288 -£40,366
C122 By Maybole  C122 Gardenrose
Path/Maybole - School
Road/Minishant, Maybole 
C122 Gardenrose
Path/Maybole - School
Road/Minishant, Maybole
School to new
Bypass 
Ladycross to new
Bypass
50  £58,095 £58,097 -£2 Complete
B7023 Maybole Ballochbroe to Crosshill Dalhowan to C58  £275,435 £362,350 -£86,915 Complete
A719
PH 2
By Maidens 
By Dunure
Pennyglen/B7023 -
Kirkoswald Road/Maidens,
Maidens 
A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
B7023 Enoch Lodge
-Caravan Park 
Cemetery to
Drumshang
67 £281,669 £326,746 -£45,077 Complete 
Complete A719
PH 1
By Maidens  Pennyglen/B7023 -
Kirkoswald Rd & 
Turnberry Rd /Maidens,
Turnberry 
Morriston Farm to
Jct Blawearie 
Maidens to
Turnberry
56  £441,666 £540,857 -£99,191
Uncl Maybole Ashgrove Avenue Full Length  £88,954 £102,985 -£14,031 Complete 
SAC - Carriageway Structural Maintenance Programme – New Sites identified for 2024 to 2026 
B749 Troon Monktonhill Road Southwood jct to
Isle of Pin
59 £210,000 £265,328  -£55,328 Complete.  66

Page 67

Official
B749 Troon Craigend Road Fullarton Drive
railway bridge to
South Beach
48 £167,500 £201,706  -£34,206  Complete 
B749 Troon South Beach  Lochend Road to
Academy Street jct
54 £200,000 £307,540  -£107,540  Complete. 
C44 Dailly Dailly to Turnberry Farden 500m
towards Drummock
39 £112,560 £71,137  +£41,422  Complete 
B7027 Barr Knowe Road Lochtonmill
southwards 
£63,000 £53,406.44 +£9,593  Complete 
B734 Colmonell Colmonell to the A77   £106,560 £150,273  -£43,713  Complete 
B7023 Maybole C58 to Cemetary   £297,606 £271,503  +£26,102  Complete 
A70 
C39
Coylton 
Ayr
Joppa 
Doonholm Road
Hole Road jct to
Pharmacy
Alloway to The
Loaning
35 
43
£179,321  £155,377  +£23,944  Complete
C145 Ayr Hillfoot Road Holmston Rd to
Holmston Dr
54 £91,875 £123,733 -£31,858  Complete
Uncl Maybole Queens Terrace/Chesney
Grove/Kincraig Avenue
Full Road 33
33
£166,275  £174,448  -£8,173  Complete
Uncl Maybole Cargill Road Full Road 47 £46,900 £48,224 -£1,324  Complete 
C1
(STTS)
Straiton Newton Stewart Road U8 towards Straiton
to U57
44 £120,400 £119.293  +£1,107  Complete –
final measure 
B7045
(STTS)
Maybole Cassilis to Kirkmichael Rd Crorieshill Farm
northwards for
360m
44 £46,750  £51,700 -£4,950 Complete
Uncl Ayr Saltpans Road North from Glebe
Road
46 £112,249 £118,940 -£6,691  Complete 
Uncl Prestwick Morris Road Full Road 43 £55,000 £107,345 -£52,345  Complete 
Uncl Ayr Green Street Waggon Road to
Crown Street
42 £130,000 £214,584 -£84,584  Complete
Uncl Prestwick Craigie Street Full length 39 £30,000 £36,725 -£6,725  Complete
67

Page 68

Official
B744 By Annbank B744 Belston/A70 -
Weston Avenue/Annbank,
Ayr
Auchincruive
Junction to
Glenview
52 £120,000  £139,872  -£19,872  Complete 
B742 By Maybole Dalrymple to Barnford
Farm
Dalrymple Road 46 £130,000  £138,058 -£8,058  Complete
Uncl Maybole Hicks Avenue Full cway & fway 30 £104,000 £133,263 -£29,263 Complete
C59 Colmonell Craigneil Road B734 to Bridge  £67,000 £53,129 +£13,871 Complete 
Uncl Ayr Peggieshill (PH1) Dalmilling Rd to
Nursery Rd
44 £92,000 £99,038 -£7,038  Complete 
Uncl Ayr Kincaidston (PH1) Marigold Sq to
Honeysuckle Park
52 £185,000 £181,768 +£3,232  Complete
Uncl Girvan Louisa Drive Knockcushion St to
Duncan St 
£103,640 £91,410 +£12,230 Complete
Uncl Ayr Peggieshill Rd (PH2) Nursery Rd to
Fenwickland Ave
44 £100,000 £81,228 +18,772 Complete 
C74 By Ayr MacNairston Rd C105 to B742
junction
52 £102,000 £101,917.11 +£82.89 Complete 
B742 By Maybole Nether Culzean Dalrymple
Rd
Barnford farm to
Nether Culzean
42 £145,000 £144,902  +£97.79  Complete 
Uncl Ayr Ellisland Square (Contains
Coal Tar)
Full Length 42 £145,000  145,996.28 -£996.28 Complete 
Uncl Ayr Kincaidston Drive (PH2) Honeysuckle Park to
Dalmellington Rd
52 £135,000 £137,176.04 -£2,176.04 Complete
B742 Mossblown Sandyford Road From a point 180
metres east of A719
junction eastwards
for 680m
53 £183,751 189,826.06 -£6,074.06  Complete
Uncl Ayr Dalmilling Road  Harthall to
Mainholm Rd
37 £275,000  £255,046.82 +£19,953.18  Complete
Uncl Prestwick Bellevue Road  From Main Street to
Adamton Road 
£38,039.04   Carried
forward to
2026/27
Uncl Girvan Todd Street 
(non hazardous)
Full length 31 £32,894   Carried
forward to
2026/27
Uncl Girvan Fauldribbon Road
(Hazardous)
Full length 34 £31,813 
(to be re-
estimated)  
Carried
forward to
2026/27
68

Page 69

Official
Uncl Girvan B741 Linfern Road  NO.79 to no.3 near
Main Street
29 £100,517 £33,706.90  Complete –
final measure 
Uncl Maybole Carrick Street  Ladyland Rd  to B77 33 £26,130   Carried
forward to
2026/27
Uncl Maybole Wellington Street  Ladyland Rd to
Carrick St
30 £18,090   Carried
forward to
2026/27
Uncl Maybole Manse Street 
(Hazardous)
Drumellan St to
Abbott St 
£20,100
(to be re-
estimated)  
Carried
forward to
2026/27
Uncl Girvan Hamilton Street  Church Sq to Bridge
St
46 £49,655.55 £5,458.65  Ongoing
Uncl Ayr Chapel Park Road
(to be tested)
Full length 40 £55,984   Carried
forward to
2026/27
Uncl Prestwick St Cuthbert’s Rd 
(to be tested)
St Andrew’s Ave to
Kirklandholm 
£38,587   Carried
forward to
2026/27 
SAC – Overlay surfacing (potential future surface dressing) 
U39 Dailly Hawkhill Road Old Dailly from
number 1 to
number 12
N/A £125,000 £21,491.43  Final measure
required 
SAC - Footway Structural Maintenance Programme over two years 2024 to 2026 
C17 Tarbolton Westport Footway North side 28 £17,370 £24,984 -£7,644 Complete 
Uncl Prestwick Hunters Avenue South from
Heathfield Road,
west side
23 £7,500 £5,393 +£2,107  Complete
Uncl Troon Morven Drive Cessnock Rd to
Dundonald Rd
(Northside) 
£15,072 £28,820 -£13,748 Complete
C151 Dailly Woodside Both sides from
Back St and
Hadyard Terr
30 £20,400 £17,147 +£3,253 Complete 
Uncl Crosshill Newton Street Church Side of road 30 £15,795 £14,440 +£1,355 Complete
69

Page 70

Official
Uncl Dailly Hadyard Terrace Inside footway +
part outer section
28 £54,400 £20,110 +£34,290 Complete 
SAC - Footway Structural Maintenance Programme – sites identified for 2024 to 2026 
Uncl Mossblown Martin Avenue Mossblown 28 £28,300 £30,829 -£2,529 Complete 
B744 Annbank Weston Brae Full Length 28 £10,700 £5,761 +£4,939 Complete
B730 Dundonald Drybridge Road Bowling Green to
Kilnford Dr
28 £18,963 £15,890 +£3,073 Complete 
Uncl Ayr Bellevue Crescent Full Length 34 £30,000 £24,299 +£5,701  Further to tree
inspection,
scope of work
amended to
patching -
Complete
Uncl Maidens Ardlochan Road Full Length 30 £21,000   To be re-
assessed
following
Utility works. 
Likely to carry
forward to
2026/27 
Uncl Dailly Church Crecent Odd numbers full
length
30 £20,000  Complete –
final measure
Ayrshire Roads Alliance - Footway Structural Maintenance Programme – sites identified for future budget allocation 
B743 Mossblown Mauchline Road Fourways to railway
bridge north side
28 £15,300   Carried
forward to
2026/27
Uncl Ayr Lochpark Slab replacement 23 £20,425   Carried
forward to
2026/27 
SAC - Lighting Programme 2025/26 
Town Location Work Type No of
columns
Estimated
Programme Cost
Comments Variance +/- 70

Page 71

Official
Ayr Ayr - Old Hillfoot Road, Hillfoot
Crescent & Souter Place
Old steel columns &
unreliable 5th Core 5 £30,000 Complete 
Ayr Cunningham Crescent & Area Unreliable 5th Core
Supplies 16 £40,000 Complete 
Troon Concrete Column
Replacements Ph3
Old deteriorated concrete
columns 43 £55,000 Complete 
£125,000   
SAC - Traffic, Transportation and Road Safety Programmes 2025/26
(i) Road Safety Programme 
(ii) Safer Neighborhoods 
Town Location Proposed Scheme Progress
Town/Route Location Proposed Scheme Progress
Various Various locations   Various schemes (TBC), included in
the FY25/26 programme, as follows:
• Route Action Plan for the
B743 at St Quivox;
• B743 review at Failford
Bridge;
• Speed reduction measures at
Coalpots Road at The
Avenue;
• Loans 20mph – further
measures to improve
compliance;
• Belmont Academy VAS
upgrades;
• Links Road, Prestwick -
Design 
The ARA are now progressing the
schemes as identified within the
current financial year.
71

Page 72

Official
Phase 4 20mph schemes Various roads (TBC) 20mph speed limit schemes Phase 4 schemes are planned to
include Coylton, Maybole and Girvan
(to align with Transport Scotland’s
Trunk Road speed reduction
proposals)
Various Various locations Vehicle activated signs upgrade Pending implementation of new
contract, and extents of upgrades will
be subject to budget. 
(iii) Rural Route Action Plans 
Route Location Proposed Scheme Progress
B743  Between the A77(T) and Auchincruive (St
Quivox)
Speed reduction and road safety
measures
Listed under RSIF schemes above –
completed in March 26. 
(iv) Active Travel Infrastructure – ATIF & Sustrans 
Town Location Proposed Scheme Progress
Various Various locations Various smaller schemes under Tier 1
funding, anticipated t include:
• New pedestrian crossing
facilities – A79 Prestwick;
• Improved crossing points,
Bradan Road, Troon;
• New pedestrian crossing,
Deveron Road, Troon;
• Pedestrian Crossing
Enhancements, Troon –
increased ferry traffic
response    
Currently finalising a package of
schemes to be progressed during the
current financial year making use of
the Tier 1 grant award.
Loans To Troon – North DR North Drive Loans to Troon Phase 3 Construction underway, completion
date 31st March 2026
Dundonald To the northern side of the A759 Dundonald to Barassie Phase 1 Construction underway, completion
date 31st July 2026  72

Page 73

Official
Ayr Town Centre Accessible Ayr £778,780 received to complete RIBA
Stage 4 of Route 1 Phase 1
Prestwick, Troon & Barassie NCN7 from Prestick Station to A759 Barassie Prestwick to Barassie £780,000 received to complete RIBA
Stage 4 
SAC Structures Capital Programme 2025/26 (Includes works carried forward from 2023/24/25) 
Description   Work Type Estimated
Programme Cost 
Comments Variance +/-
A79-30 Victoria Bridge Concrete Repairs and Painting 
£432,776 
Completed  
0
A79-40  John Street, Ayr, Railway Bridge Parapets  £362,000 Design Phase.  
-£274,433
FB.AYR-70 River Doon Cycleway Footbridge (Millenium Br)
Refurbishment
£145,000 Lowest tender returned was
£305,154.05. 27th February
Leadership Panel approval has
been sought to use the budget
for Craigholm Footbridge for
this project to allow award.     
-£133,993
U740-10 Barbieston Bridge Replacement Design  £86,820.00 Design Phase 50% - 50% EAC /
SAC funded project as this is a
boundary bridge. Site
investigation has been
completed and options
development ongoing.  
-£55,750 
Various
Locations
Vehicle Restraint Barrier Renewal £50,000  Design Phase Contract
awarded works ongoing  -£24,410
Various
Locations
Cattle Grid Renewal Programme £33,600 Design Phase Contract
awarded works ongoing
drainage issues at the works
have increased costs. 
+£18,089.14
73

Page 74

Official
C12 Dunure Station Road Dunure, Slope Stabilisation
£130,000
A 70m long gravity retaining
wall option has been selected
as the most optimum solution. 
Contract awarded pre-start
process ongoing. Work on site
has commenced
Girvan Harbour Girvan Harbour South Pier Repairs £136,000
£400,000 added to
this budget from
timber jetty as
approved by panel 
Total Budget now
£436,000
The South Pier Quay has been
assessed to have a load
carrying capacity of 0.5 tonnes
per square metre. Following
dive surveys undertaken
earlier this year the option
chosen to extend the life of
the structure is steel plate
repairs to the existing sheet
piles and grouting of the voids.
Completion and submission of
the contract documentation
was delayed in order that the
significant damage caused to
the South Pier Quay by the Q-
Varl boat, when it broke its
moorings in a storm, could be
assessed and any repairs
required could be included in
the contract documents.
Tenders to be issued in August
with works completed by the
end of 2025.
Contract award delayed until
budget transfer from Timber
Jetty Sheet Piles to South Pier
Quay budget is approved a
Cabinet 25th November. 
Work has commenced on site.
-£421,126
Girvan Harbour Girvan Harbour Timber Jetty Sheet Piles The sediment transfer model
has been completed including
options to deal with the
-
-£89,632.70 74

Page 75

Official 
defective sheet piling. The
recommended option is to
replace only the piling on the
curved section from the
lifeboat station. Contract
documentation substantially
complete and will be issued
once tenders for the South Pier
Quay works have been
returned and costs are known.
The South Pier Quay works are
considered a priority which is
why the request to transfer
budget has been made to SAC
Cabinet. 
£1,881,083 
75

Page 76

Official
Appendix 3 
EV PUBLIC CHARGERS 
EAST AYRSHIRE 
CPS ID Type Make Location
51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU
50821 22kw eVolt Foregate Noth Car Park, Kilmarnock, KA1 1LU
51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH
52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW
70279 Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP
60301 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR
52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU 76

Page 77

Official
52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE
52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG
52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS
52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB
52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ
52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB
52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ
52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ
52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY
53778 Rapid eVolt Main Street Car Park, Muirkirk
53775 22kw eVolt Rose Reilly Sports Centre, Stewarton
53776 7kw eVolt Standalane Car Park, Stewarton
60786 7kW eVolt Academy Street, Hurlford
60792 22kW eVolt Drongan Centre car park, Mill of Shield Road
51210 22kW eVolt Carnshalloch Avenue car park, Patna
60950 22kW eVolt New Cumnock Outdoor Swimming Pool car park
60954 22kW eVolt Gatehead Road car park, Crosshouse
61021 7kW eVolt East Ayrshire Community Hospital, Cumnock
61022 7kW eVolt East Ayrshire Community Hospital, Cumnock
61983 7kW eVolt Morton Place car park, Kilmarnock 77

Page 78

Official
61984 7kW eVolt Morton Place car park, Kilmarnock
61985 7kW eVolt Morton Place car park, Kilmarnock
62184 7kW eVolt Browns Road car park, Newmilns
61886 22kW eVolt Sturrock Street, Kilmarnock
62938 7kW eVolt New London Road car park, Kilmarnock
SOUTH AYRSHIRE
CPS ID Type Make Location
51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW
51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU
70278 Rapid eVolt Burns Statue Square, Ayr, KA7 UT
52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN
52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY
50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ
50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF
52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG
70280 Rapid eVolt Girvan Harbour, Girvan, KA26 9AG
52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR
52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH
52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU
52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE
52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE
52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL
53774 Rapid eVolt Academy Street, Troon
53773 Rapid eVolt Lodge Road Car Park, Turnberry 78

Page 79

Official
53777 22kw eVolt Burnside Road, Monkton
60793 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly
60081 22kw eVolt Inches Close car park, Maybole
61982 22kw eVolt Tarbolton Community Campus car park, Tarbolton
61986 22kw eVolt Dundonald Primary School car park, Dundonald
60086 22kw eVolt Mossblown Activity Centre car park, Mossblown
60082 22kw eVolt Kirkoswald Main Street car park, Kirkoswald
61979 7kW eVolt Chalmers Arcade car park, Girvan
61980 7kW eVolt Chalmers Arcade car park, Girvan
61981 7kW eVolt Chalmers Arcade car park, Girvan
62000 22kW eVolt Barrhill Community car park, Main Street, Barrhill
79

Page 80

Official
Appendix 4
SAC WARD INVESTMENT & PROMENADE PROGRAMME
2025/26 incl. works carried over from 2024/25
Roads Maintenance Unit
LOCATION Description PO Value Cost to Date variance +/- Comment
Troon Troon Esplanade (Ph.3) –
Resurfacing 
Ph1 & 2 completed 2024/25. 
Ph. 3 site measured. 
Provisional start date April
2026
Prestwick
Boydfield Gardens
Surfacing/Repair & renew steps
to – COMPLETE
Install power supply to Boydfield
Gardens and Links Road -
ONGOING
£85,000.00 £24,561.11
Surfacing Complete – Final
measure
Ongoing -Scottish Power
quote to be received. 
Followed by agreed site start
date in March 2026
Ayr North Lochside Community Centre - 
Provision of Bike Shelter £15,000.00 Complete – Final Measure
Ayr East Glencairn Park – 
footpath upgrade £43,000 £3,593.61 Works ongoing
Ayr East Peggieshill Road – 
Car parking provision £182,620.88 Consultation required. 
Carried forward to 2026/27
Ayr West Ayr Promenade – 
raised footway works
ON HOLD - Feasibility study
ongoing with Professional
Design Services.  Carried
forward to 2026/27 
Kyle
Loans Community Hall – 
Install a History Park & link to
Smugglers trail
£46,709.06
PO required.  Carried
forward to 2026/27
Kyle
Mossblown village hall –
Improve accessibility £11,072.70 £11,961.99 +£889.29 Complete – final measure
Kyle
Collins Drive to Collenan Avenue,
Loans –
Link Path
£57,323.90
Consultation required. 
Carried forward to 2026/27
80

Page 81

Official 
Kyle Symington Bowling Green –
Resurface Car Park £149,000   Carried forward to 2026/27
Kyle
Collenan Reservoir – 
Construct new footpath at
southern edge of 
£55,000  
No being taken forward.
Troon Troon Cemetery –
section of new footpath £5,395.95  £3,994.12
-£1,401.83 
Design and Flooding Section
Troon  Shore Defence Structural
Stabilisation £10,000.00 £15,432.00 -£5,432.00 Complete 
Citadel Footbridge
Refurbishment
Remove and renew timber deck
parapet elements.  Surface
prepare and paint.  Remove or
repair lighting
£140,000.00 £259,957.00  -£119,957.00  Complete 
Girvan Boating Pond
Refurbishment 
Install new stainless steel
reinforced concrete base slab to
reduce water leakage.
£175,000.00 £170,641.00  £4,359.00  Complete 
Dunure Castle
Footbridge
Replacement 
Replace existing small span
concrete footbridge with a larger
footbridge with a view and good
aesthetics   
£230,000.00 
Procurement exercise
commenced 
Lighting Section
Ayr East  Glencairn Park – Install footpath
lighting £23,000.00   Complete – final measure
Ayr West  Replacement of column lighting
on Ayr Promenade £145,000.00  
Complete – final measure
Ayr West
New Bridge & Auld Brig.  Design
fees for installation of
architectural floodlighting to
structures
£50,000.00  
Procurement exercise
commenced 
Ayr West  Wrap round decorative lighting to
columns on Ayr Promenade 
Materials ordered.
Programmed installation
March 26
81

Page 82

Official#
Tag Number Owner Location Region Species
Planting Year
Height (m)
DBH
(cm)
Crown Spread (m)
Tree Count
Last Inspection
Date Report Work
W
ork Quantity
Work Comments Work Priority QTRA
Score
Photo
Reference
A70 u:1:c:Ash Roads A70 Road A Type Ash 1970 13 50 8 3 19/12/2025
Three trees within group capable of impacting highway.  To the south of group
(closest to the river) is a multistemmed ivy clad tree with cat. 4 ADB.  Centrally
within group is a twin stemmed (from base) mature tree with dense ivy, and cat.
4 ADB   To the north of the group and set back from the road some 12m is a
Other (Specify) 1 Treat stumps near bridge works 04-12
Months 5,000
A70 u:1:c:Ash Roads A70 Road A Type Ash 1970 13 50 8 3 19/12/2025
Three trees within group capable of impacting highway.  To the south of group
(closest to the river) is a multistemmed ivy clad tree with cat. 4 ADB.  Centrally
within group is a twin stemmed (from base) mature tree with dense ivy, and cat.
4 ADB   To the north of the group and set back from the road some 12m is a
Dismantle 1 Approx 20 stems from coppiced stools. 01-04
Months 5,000
A70006 Roads A70 Road A Type Ash 1990 10 17 5 15/01/2026 3 stems from base.  Ash dieback approx 95% defoliation. Dismantle 1 Moribund 01-04
Months 10,000
[48930,
127262,
127263]
A70180 Roads A70 Road A Type Elm - English
Elm 1950 7 50 7 24/01/2026 Dead standing tree Dismantle 1 Dismantle. 01-04
Months 4,000 [49428,
131013]
A71
eastbound:1:d:Ash Roads A71 Road A Type Ash 1999 10 30 5 150 15/02/2026 mixed broadleaf boundary group located on embankment Ash component adb
cat range 2-4 Fell 50 remove all cat 4 ash 01-04
Months 5,000
A71 R:1:e:Ash Roads A71 Road A Type Ash 1995 15 30 6 500 17/02/2026 set back 10m and 5m above road level. buffer group. Ash component adb cat 2-4 Dismantle 350 All cat 4 and standing dead trees 01-04
Months 5,000
A71
westtbound:1:a:Ash Roads A71 Road A Type Ash 1999 12 40 6 11 15/02/2026 sporadic locations within group. adb cat range 1-4 with worst affected at W edge
by over pass Fell 1 remove cat 4 trees, located by overpass W edge
of group
01-04
Months 5,000
A71
westtbound:1:e:Ash Roads A71 Road A Type Ash 2000 10 20 5 12 17/02/2026 located 3m back from road on embankment.  Ash component adb cat 2-4 Fell 3 adb cat 4trees 04-12
Months 5,000
A71:1:b:Ash Roads A71 Road A Type Ash 1980 13 50 8 15 05/02/2026
Linear double row of planted Ash. Some coppiced regens. Ash Dieback has
entered group with Ash Dieback defoliation ranging from 10 to 90% and
worsening.
Dismantle 6 Remove all Ash with defoliation greater than
75%.
01-04
Months 5,000
A71019 Roads A71 Road A Type Alder - Italian
Alder 1965 10 57 11 03/02/2026 Longitudinal cavity at a height of 5m towards East, 1m x 300mm length. Entire
East crown dead.  severe decline. Fell 1 Moribund 01-04
Months 5,000
[43342,
50720,
133314,
133313
A71026 Roads A71 Road A Type Elm - English
Elm 1995 8 20 6 03/02/2026 Dead and hung in thorn tree. Dismantle 1 Remove dead tree adjacent to road. 01-04
Months 5,000 [133322]
A71033 Roads A71 Road A Type Beech -
Common 1975 9 38 5 03/02/2026 Moribund standing tree Fell 1 Fell into field. 01-04
Months 10,000 [43345,
133320]
A71045 Roads A71 Road A Type Ash 1955 8 110 9 05/02/2026
Multiple veteran characteristics. However poses a significant risk to pavement
and road in its current form. Heavily reduced in the past, t road side. Multiple
Ganoderma adspersum brackets from road side bade to 1.5m. Heavily
retrenched upper crown deadwood up to 20cm diameter Ash Dieback present
Dismantle 1 Pollard to approx 4m within 28 days. 00-01
Months 500
[50352,
50351,
133934,
133935
A71046 Roads A71 Road A Type Cherry - Wild
Cherry Gean 1975 6 37 6 05/02/2026 Significant reduction in vitality. Upper crown decline. Unidentified dessicated
fruiting bodies at base.  Basal decay suspected. Fell 1 Basal decay. 01-04
Months 4,000
[50321,
50320,
133952,
133951]
A71098 Roads A71 Road A Type Elm - English
Elm 1951 7 15 2 29/01/2026 Dead standing tree Dismantle 1 Dead standing tree 01-04
Months 5,000
[43274,
133128,
133129]
A713:1:f:Ash Roads A713 Road A Type Ash 1980 12 27 4 37 17/12/2025 Appears to be LA land, of sone sort, public parkland Ash Dieback present ranging
from 10 - >90% defoliation and worsening. Dismantle 1 Remove all Ash with Ash Dieback greater than
60%. Approx half of group
04-12
Months 10,000
A713:1:s:Ash Roads A713 Road A Type Ash 2009 8 22 3 7 12/12/2025 Young to semi mature, largely set back from road or small in size. Ash Dieback
present 15 - 85%, 5m Ash at top of hill, near dead, defoliation. Fell 1 1 x 5m tall x 25cm dia  dead ash at top of hill, set
back 3.5m.
01-04
Months 5,000
Appendix 5East Ayrshire
82

Page 83

Official#
A713008 Roads A713 Road A Type Ash 2000 6 11 3 12/12/2025 2x stems 2m apart. 95% defoliation. Fell 1 01-04
Months 10,000
["temp_0.187
82744014914
932",
135792]
A713036 Roads A713 Road A Type Beech -
Common 1965 12 45 5 15/12/2025
1.2m x 35cm decay column from North base, old detachment/pruning point.
Kretzschmaria to North base. Sounding indicates significant hollowing to North
base with highway to 6m South.
Dismantle 1 Internal decay. 00-01
Months 400
[48821,
48820,
48819,
121210
A713079 Roads A713 Road A Type Ash 1990 7 25 4 12/12/2025 Ash dieback approx 90% defoliation. Fell 1 Moribund 01-04
Months 10,000
["temp_0.374
93648170796
1", 135820]
A713082 Roads A713 Road A Type Ash 1990 9 30 6 12/12/2025 Set back 5m from road and 2m down slope.  Ash dieback approx 75% defoliation Fell 1 Ash dieback approx 75% defoliation. 01-04
Months 10,000
["temp_0.981
21427105827
39", 135821]
A713095 Roads A713 Road A Type Ash 1995 7 35 4 15/12/2025 Ash dieback approx 90% defoliation Fell 1 Ash dieback approx 90% defoliation 01-04
Months 5,000 [49781,
121177]
A719 R:1:c:Ash Roads A719 Road A Type Ash 2005 6 30 4 65 06/02/2026
adb from standing dead/100% to 10%  individually low risk trees but due to
location on fast long sweeping bend individual failure has potential to cause
"hazard avoidance" accident/rta.  3x larger ash vary from 50% to 10% dieback 
90% of younger/smaller diameter trees are standing dead  work at location will
Fell 30
Go through group and remove all Ash trees at or
above 75% defoliation.  all trees at location still
present 24/9/24: trees should be removed at
earliest opportunity site will require 2way lights
01-04
Months 5,000
A719 R:1:d:Ash Roads A719 Road A Type Ash 2005 10 20 3 30 06/02/2026
Ash Dieback from 50 % up to 100% canopy loss  individual tree risk is low but due
to location on fast sweeping bend there is high potential for "hazard avoidance"
accidet/rta   recommend fell all ash at location to remove hazards and alleviate
future traffic management costs for future felling that would be required
Fell 20
Go through group and remove all Ash trees at or
above 75% defoliation  24/9/24: all ash at
location are still in situ. recommend removal of
all ash within falling distance of highway   site
01-04
Months 5,000
A719006 Roads A719 Road A Type Elm - English
Elm 1990 8 25 6 05/02/2026 2x dead standing stems Dismantle 1 2x  Dead standing stems. 01-04
Months 5,000
[48049,
48051,
134818,
134817]
A719024 Roads A719 Road A Type Ash 1990 10 21 2 06/02/2026 Dead standing tree Dismantle 1 Dismantle 01-04
Months 5,000
[48024,
48022,
48025,
134838]
A719025 Roads A719 Road A Type Ash 1990 11 21 2 06/02/2026 Dead standing tree Dismantle 1 site requires mewp and two way lights 01-04
Months 5,000
[48125,
48123,
48127,
48129
A735011 Roads A735 Road A Type Cherry - Wild
Cherry Gean 1975 5 48 6 12/02/2026
Areas of dieback in canopy. Ivy cover extending intonupper canopy. Sounding
mallet indicates decay in base to south. Ganodrrma brackets present on root
collar.
Dismantle 1 01-04
Months 10,000
[43429,
135134,
135133,
135132]
A735011 Roads A735 Road A Type Cherry - Wild
Cherry Gean 1975 5 48 6 12/02/2026
Areas of dieback in canopy. Ivy cover extending intonupper canopy. Sounding
mallet indicates decay in base to south. Ganodrrma brackets present on root
collar.
Stump Grinding 1 01-04
Months 10,000
[43429,
135134,
135133,
135132]
A735011 Roads A735 Road A Type Cherry - Wild
Cherry Gean 1975 5 48 6 12/02/2026
Areas of dieback in canopy. Ivy cover extending intonupper canopy. Sounding
mallet indicates decay in base to south. Ganodrrma brackets present on root
collar.
Remove Tree 1 01-04
Months 10,000
[43429,
135134,
135133,
135132]
PRIN005 Roads A735 Road A Type Sycamore 1980 7 35 6 15/02/2026 compacted rootzone.  severe decline in vitality.  significant dieback in upper
crown . weighted N over access road Dismantle 1 01-04
Months 5,000 [43435,
135500]
NEW_10149_0005 Roads
A759
Dundonald
Road
Road A Type Ash 1990 9 20 3 10/02/2026 Dead standing tree. Fell 1 01-04
Months 5,000 [135044,
135045]
5477KRAA Roads Aird Avenue Kilmarnock
Gargieston
Cherry - Wild
Cherry Gean 1950 5 38 3 12/02/2026 Dead standing tree. Dismantle 1 01-04
Months 3,000 [135087]
5477KRAA Roads Aird Avenue Kilmarnock
Gargieston
Cherry - Wild
Cherry Gean 1950 5 38 3 12/02/2026 Dead standing tree. Stump Grinding 1 01-04
Months 3,000 [135087]
5506KRAA Roads Aird Avenue Kilmarnock
Gargieston
Whitebeam -
Swedish
WBeam
1950 12 75 10 12/02/2026 Extensive clumps of  dessicated fungal fruiting bodies believed at base towards
road.  Moderate hollowing of Stem detected with sounding hammer.
Crown
Reduction (10-
25%)
1
Reduce crown height and spread by <2m where
applicable to reduce overhang of residential
boundary.
04-12
Months 3,000
[135598,
135600,
135599]
5506KRAA Roads Aird Avenue Kilmarnock
Gargieston
Whitebeam -
Swedish
WBeam
1950 12 75 10 12/02/2026 Extensive clumps of  dessicated fungal fruiting bodies believed at base towards
road.  Moderate hollowing of Stem detected with sounding hammer.
Detailed
Inspection -
Ground Based
1 Recommend inspection using  Tomography to
ascertain extent of decay.
01-04
Months 3,000
[135598,
135600,
135599]
83

Page 84

Official#
2845AHPP Neighbourhood
Services
Annanhill Park
(Overhanging
B7081)
Parks
Kilmarnock
Lime -
Common 1940 18 65 10 17/02/2026 kretzschmaria deusta colonisation E. moderate deadwood throughout
architecture Dismantle 1 01-04
Months 4,000 [135720,
135721]
3403AHPP Neighbourhood
Services
Annanhill Park
(Overhanging
B7081)
Parks
Kilmarnock Sycamore 1940 17 85 12 17/02/2026
significant root decay W, with cankerous wound W. mycelium matt observer's in
hollowing, no fruiting bodies observed. cankerous expulsion wound at primary
union 5m W where bifurcated union becomes multistemmed,  possibly from
historic failure Asymmetric form favouring N overhanging road previous work
Dismantle 1 01-04
Months 4,000
[135623,
135624,
135625,
135626]
3403AHPP Neighbourhood
Services
Annanhill Park
(Overhanging
B7081)
Parks
Kilmarnock Sycamore 1940 17 85 12 17/02/2026
significant root decay W, with cankerous wound W. mycelium matt observer's in
hollowing, no fruiting bodies observed. cankerous expulsion wound at primary
union 5m W where bifurcated union becomes multistemmed,  possibly from
historic failure Asymmetric form favouring N overhanging road previous work
Replace Tree 1 12-24
Months 4,000
[135623,
135624,
135625,
135626]
3403AHPP Neighbourhood
Services
Annanhill Park
(Overhanging
B7081)
Parks
Kilmarnock Sycamore 1940 17 85 12 17/02/2026
significant root decay W, with cankerous wound W. mycelium matt observer's in
hollowing, no fruiting bodies observed. cankerous expulsion wound at primary
union 5m W where bifurcated union becomes multistemmed,  possibly from
historic failure Asymmetric form favouring N overhanging road previous work
Stump Grinding 1 04-12
Months 4,000
[135623,
135624,
135625,
135626]
3421AHPP Neighbourhood
Services
Annanhill Park
(Overhanging
B7081)
Parks
Kilmarnock
Lime -
Common 1940 20 75 15 16/02/2026
managed basal epicormic. basal decay E .  sounding hammer indicates potential
for nternal columnar decay non uniform bifurcated codom stems from 2m
moderate deadwood throughout architecture
Deadwooding 1 04-12
Months 10,000 [135692,
135693]
B713014 Roads B7013 Road B Type Sycamore 1995 6 18 4 17/12/2025 Located on banking next to road, appears to be local authority land. Dead
standing tree, basal epicormics. Tree is lodged against telegraph pole. Fell 1 04-12
Months 3,000 [50673,
121922]
B703001 Roads B7036 Road B Type Beech -
Common 1940 14 110 13 09/01/2026
DBH estimated at base due to multiple branch arisings from 1 to 2m region. 1m x
15cm stem decay wound from roadside base with necrotising bark layer adjacent
to it and up to 4m. Large unoccluded and decaying historic pruning wounds.
Kretzschmaria deusta fruiting at 2m to centre of stem division region Road side
Dismantle 1 01-04
Months 10,000 [51841,
125246]
B703013 Roads B7036 Road B Type Beech -
Common 1945 12 76 9 09/01/2026
Kretzschmaria deusta on butress's to West of base, South side of buttress.
Significant necrosis up road side of stem to upper central crown. Crown has
previously been significantly reduced in height to 12m and back from road edge.
Very little adative growth on prunning wounds indicating a significant reduction
Dismantle 1 01-04
Months 4,000 [125242]
B703018 Roads B7036 Road B Type Beech -
Common 1950 11 104 14 09/01/2026 Dead/dying, late stage terminal decline. Crown us bias away from road. Dismantle 1 01-04
Months 10,000 [125238]
B703028 Roads B7036 Road B Type Beech -
Common 1941 12 92 11 09/01/2026
Multistemmed crown from approx 1.5-2m. Majority of field side growth/stems
have been removed resulting in the remaining crown been heavily bias over
road. Stub from central dominant stem that has previously fractured has a large
cavity with progressive decay and kretzschmaria deusta fruiting bodies present
Dismantle 1 01-04
Months 10,000
[51823,
125237,
125236]
B703094 Roads B7037 Road B Type Beech -
Common 1910 18 95 13 28/01/2026 Progressive state of decline.  Upper crown completely dead. Dismantle 1 Progressive state of decline 01-04
Months 5,000
[50601,
50602,
50603,
132979
B703140 Roads B7037 Road B Type Beech -
Common 1940 13 53 8 28/01/2026
2nd Beech from South. Cavity from a height of 2.5m, approx 2m x 250mm, and a
second cavity at 5m. Both exhibit significant internal hollowing, projected to be
interconnecting decay columns. Upper crown in decline.
Dismantle 1 Traffic management required 01-04
Months 4,000
[50500,
50499,
132929,
132928]
B703141 Roads B7037 Road B Type Beech -
Common 1960 8 40 3 28/01/2026 Dead standing tree  Advanced state of decay. Fell 1 Fell within 28 days. 00-01
Months 1,000
[132925,
132927,
132926]
B703142 Roads B7037 Road B Type Beech -
Common 1900 18 95 16 28/01/2026
4th Beech from South Significant reduction in vitality and a late stage of
decline.90% crown death. 3cm emerging Ganoderma spp to roadside base.
Pleurotus ostreatus fruiting on multiple branches in crown.
Dismantle 1 Traffic management required. 01-04
Months 10,000
[50496,
50497,
132923,
132924]
B703144 Roads B7037 Road B Type Beech -
Common 1950 13 54 11 28/01/2026
6th Beech from South Stem wound from 0.5m East, roadside to a height of
approx 5m East and 25cm wide, at base tapering to 10cm at top. Ongoing inward
decay is visible with White mycelium massing visible to margins. Tree has
attempted to adapt but Southern margin is irregular and appears to be failing
Dismantle 1 Traffic management required. 01-04
Months 4,000
[50518,
50517,
133006,
133005]
B703145 Roads B7037 Road B Type
Larch -
European
Larch
1975 9 32 7 28/01/2026 1st Larch from South Dead standing tree, leaning to road Fell 1 Traffic management required. 01-04
Months 5,000
[50520,
132996,
132995]
B703146 Roads B7037 Road B Type
Larch -
European
Larch
1975 7 37 4 28/01/2026 2nd Larch from South Phaeolus schweinitzii fruiting bodies from bae to 2m, 4cm
to 12cm wide. Tree is dead with slight lean to road. Fell 1 Traffic management required. Fell within 28
days.
00-01
Months 1,000
B703153 Roads B7037 Road B Type Beech -
Common 1930 16 85 10 14/02/2026
dessicated ganoderma bracket E at root collar. additional brackets at 1.3m and
1.5m E. lower bole substantially obscured by boundary hedging. trifurcated
codom union 2m. Historic E stem failed at primary union. previous work request
not completed
Dismantle 1 01-04
Months 4,000
[50544,
50543,
50542,
135449
B703204 Roads B7037 Road B Type Beech -
Common 1970 15 42 6 28/01/2026
5th Beech from South Situated to North base of much larger and rapidly
declining Beech tree, which is proposed or removal. Target tree, is in a visible
state of decline, has been suppressed by larger tree and will be exposed by its
removal its removal at the same time as B703142 is therefore recommended
Dismantle 1 Traffic management required 01-04
Months 10,000
[50511,
50510,
132990,
132989]
84

Page 85

Official#
B703057 Housing B7038 Road B Type Cherry - Bird
Cherry 1960 6 46 7 23/02/2026 Moribund tree extensive Ganoderma colonisation. Stump Grinding 1 04-12
Months 1,000
[43365,
133237,
133236,
133235]
B703057 Housing B7038 Road B Type Cherry - Bird
Cherry 1960 6 46 7 23/02/2026 Moribund tree extensive Ganoderma colonisation. Dismantle 1 01-04
Months 1,000
[43365,
133237,
133236,
133235]
B703057 Housing B7038 Road B Type Cherry - Bird
Cherry 1960 6 46 7 23/02/2026 Moribund tree extensive Ganoderma colonisation. Replace Tree 1 04-12
Months 1,000
[43365,
133237,
133236,
133235]
B703059 Housing B7038 Road B Type Cherry 1960 6 55 9 09/02/2026
compacted and suppressed rootzone included non uniform primary union.
extensive decay at primary union. previous work request not completed qtra
adjusted accordingly
Stump Grinding 1 01-04
Months 10,000
[43370,
133162,
133161,
133160]
B703059 Housing B7038 Road B Type Cherry 1960 6 55 9 09/02/2026
compacted and suppressed rootzone included non uniform primary union.
extensive decay at primary union. previous work request not completed qtra
adjusted accordingly
Dismantle 1 01-04
Months 10,000
[43370,
133162,
133161,
133160]
B703059 Housing B7038 Road B Type Cherry 1960 6 55 9 09/02/2026
compacted and suppressed rootzone included non uniform primary union.
extensive decay at primary union. previous work request not completed qtra
adjusted accordingly
Replace Tree 1 04-12
Months 10,000
[43370,
133162,
133161,
133160]
X021015023 Neighbourhood
Services B7038 Road B Type Lime -
Common 1940 15 40 8 03/02/2026 dense ivy ground cover to 1m obscuring lower bole. groupsuppression creating
heavy end loading overhanging road and busstop Dismantle 1 01-04
Months 10,000 [133203,
133202]
B704043 Roads B7046 Road B Type Dead 1990 8 28 2 18/12/2025 Twin stemmed at base. Failed at base and leaning into adjacent tree. Fell 1 01-04
Months 5,000
[51585,
51584,
51586,
51583
B7064:1:b:Ash Roads B7064 Road B Type Ash 1990 10 30 5 5 15/02/2026 boundary edge Ash group set back 5m from road adb cat 3-4 Dismantle 5 5x Ash trees 01-04
Months 5,000
NEW_10147_0003 Roads B7072 Road B Type Alder -
Common 1990 9 35 7 09/02/2026 Tree in terminal decline. 50% Oof canopy dead. Wood decay on trunk, presence
of saprothyic fungal bodies. Dismantle 1 04-12
Months 10,000 [135010,
135009]
B707012 Roads B7073 Road B Type Ash 1950 15 63 13 14/01/2026 95% defoliation.  Multi-stemmed. Dismantle 1 Traffic management required. 01-04
Months 5,000 [43459,
127591]
B7073:1:a:Ash Roads B7073 Road B Type Ash 1985 13 35 6 13 14/01/2026 Ash Dieback present throughout group, up 100% defoliation Dismantle 11 Go through group removing all trees at or above
75% defoliation, approx 11 trees
01-04
Months 10,000
B7073:1:d:Ash Roads B7073 Road B Type Ash 1970 16 38 9 9 14/01/2026 Ash Dieback present throughout group, up 85 % defoliation, possible 3rd party
trees. Dismantle 93 Fell all 01-04
Months 10,000
B7073:1:e:Ash Roads B7073 Road B Type Ash 1990 14 26 6 30 14/01/2026 Ash Dieback present throughout group, up to 100% defoliation Dismantle 1 Go through group removing all stems at or
above 75% defoliation, approx 10 stems
01-04
Months 5,000
B730018 Roads B730 Road B Type Beech -
Common 1900 13 90 8 05/01/2026
Located atop 1.5m high Stone and earth wall. Bifurcated at 3m with Southern,
field side, <50cm stem lost at 1.5m above union. Northern stem bifurcates at
approx 9m with 1.2m bark expansion fissure to Western side and from union
downward and 2m bark separation fissure 30cm to North of first described
Dismantle 1 See report. 01-04
Months 10,000
[49822,
49821,
49820,
49819
B730087 Roads B730 Road B Type Ash 1940 14 60 12 18/12/2025 Co-dominant fork at base.  Majority of crown biased away from road.  2x
significant limbs above road. 90% defoliation. Ownership unclear. Dismantle 1 Owner to dismantle.  Possible EAC. 01-04
Months 10,000
[48885,
124375,
124376]
B742:2:f:Mixed
Broadleaves Roads B742 Road B Type Mixed
Broadleaves 1980 16 35 7 14 11/12/2025
Not thought to be EAC owned or managed, set back 2m from road edge.
Ownership unclear.  Ash Dieback has entered the group. 6 trees to upper end of
group and 4 Ash trees down toward bottom end of group, either side of storage
container on tarn front to East have defoliation of >75% Remaining Ash trees
Dismantle 1 dead  17cm dia x 7.5m beech opposite upper
end of lay-by
01-04
Months 5,000
A736059 Roads B743 Road B Type Ash 2012 6 12 4 13/01/2026 Co-dominant stem has failed. Fell 1 Failed Co-dominant stem. 01-04
Months 5,000
[49214,
49213,
127504,
127503]
B743041 Roads B743 Road B Type Ash 1960 16 95 12 26/01/2026
Ash Dieback 80% defoliation. Light to moderate ivy. 40cm secondary branch
detached at 3m roadside, resulting in stem and crown slight bias to field. 1 x
40cm secondary branch near fully upright and most likely of any to be able to fail
to road
Dismantle 1 Dismantle 01-04
Months 10,000 [131140,
131139]
85

Page 86

Official#
NEW_9762_0004 Roads B743 Road B Type Beech -
Common 1850 18 120 20 26/01/2026 Internal decay. 2x limbs have failed towards East. 2x  limbs oriented towards
road are highly likely to fail. Dismantle 1 Dismantle within 28 days. 00-01
Months 1,000
[131122,
131120,
131119,
131121]
5490KRAA Roads Barbadoes
Road
Kilmarnock
Gargieston
Whitebeam -
Swedish
WBeam
1970 7 36 6 12/02/2026 Significant decay in trunk. Dismantle 1 Significant decay and fracturing from base which
is progressing to a height of 2m.
01-04
Months 10,000 [135077,
135076]
5490KRAA Roads Barbadoes
Road
Kilmarnock
Gargieston
Whitebeam -
Swedish
WBeam
1970 7 36 6 12/02/2026 Significant decay in trunk. Stump Grinding 1 01-04
Months 10,000 [135077,
135076]
C10019 Roads C10 Road C Type Ash 1960 8 65 7 06/02/2026 Ash dieback approx 97% defoliation.  Significant deadwood above road. Dismantle 1 01-04
Months 5,000
[43617,
133984,
133983]
C35003 Roads C35 Road C Type Elm - Wych
Elm 1940 12 65 11 13/01/2026 Progressive state of decline Dismantle 1 Progressive state of decline. 01-04
Months 5,000
[49228,
49227,
49226,
127518
C50079 Roads C50 Road C Type Beech -
Common 1940 11 90 9 12/01/2026
Tree is in progressive decline with a sparse crown and multiple instances of
deadwood throughout. Hollow stem from base to approx 3-4m, decay has
migrated through main stem and into secondary stems. No ffb observed 01/2026
but noted in previoys assessments
Dismantle 1 01-04
Months 4,000
[50814,
50810,
50813,
50812
C50083 Roads C50 Road C Type Oak -
Common 1940 21 110 22 12/01/2026
Recorded Oct 20th 2022 - Approx 45cm diameter dominant diagonal branch at
approx 10m East has visible 1m long x approx 1cm wide crack to underside of
branch from union base,  bark separation continues along base now to approx
1 7m indicating incipient failure is occurring  additionally noted approx 30cm
Crown
Reduction (30-
50%)
1
Option 3. If retention is desired but aerial
assessment deems limb to unstable.  2-3m all
round reduction to reduced end weight loading.
01-04
Months 3,000
[50806,
50807,
50808,
50809
C50083 Roads C50 Road C Type Oak -
Common 1940 21 110 22 12/01/2026
Recorded Oct 20th 2022 - Approx 45cm diameter dominant diagonal branch at
approx 10m East has visible 1m long x approx 1cm wide crack to underside of
branch from union base,  bark separation continues along base now to approx
1 7m indicating incipient failure is occurring  additionally noted approx 30cm
Dismantle 1 Option 2. If retention is not desired.  Section fell
to ground levell
01-04
Months 3,000
[50806,
50807,
50808,
50809
C50099 Roads C50 Road C Type Beech -
Common 1950 7 62 7 11/01/2026
0.7m x 30cm basal cavity opening to South, field side, stem hollow. Minor
pruning cavities at 2m region have coalesced with stem cavity. Tree has stunted
growth with low crown feature.
Detailed
Inspection -
Ground Based
1
Resitograph or tomography on lower main stem
from base to 1-2m to better assess how sound
timber in left in lower stem.
01-04
Months 4,000 [125704]
5469KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Birch - Silver
Birch 1950 17 65 10 03/02/2026
compacted rootzone. trifurcated codom stems from 3m. lower canopy reduced,
appears to be via flail. multiple branch fractures in upper canopy with hanging
limbs within crown. previous work request qtra adjusted accordingly
Branch -
Removal 1
Remove failed and fractured branches and
prune back to union in accordance with prudent
arboricultural practices.
01-04
Months 5,000
[133268,
133267,
133266]
5474KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry - Bird
Cherry 1960 8 55 10 03/02/2026
compacted rootzone with exposed structural roots.  ganoderma fruiting SW,
possible degraded fruiting body 2.5M NE . cankerous cambial expulsions
throughout secondary architecture. historic secondary failure N 5m . progressive
decline
Dismantle 1 01-04
Months 10,000
[133252,
133251,
133250,
133249
5543KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1940 7 40 8 09/02/2026 established ganoderma colonisation fruiting W . 15°W lean over parking space
and road. previous work request not completed qtra adjusted accordingly Replace Tree 1 04-12
Months 4,000 [133296,
133295]
5543KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1940 7 40 8 09/02/2026 established ganoderma colonisation fruiting W . 15°W lean over parking space
and road. previous work request not completed qtra adjusted accordingly Stump Grinding 1 01-04
Months 4,000 [133296,
133295]
5543KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1940 7 40 8 09/02/2026 established ganoderma colonisation fruiting W . 15°W lean over parking space
and road. previous work request not completed qtra adjusted accordingly Dismantle 1 01-04
Months 4,000 [133296,
133295]
5567KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1980 5 31 6 09/02/2026 moribund tree. previous work request not completed qtra adjusted accordingly Dismantle 1 01-04
Months 4,000 [133289]
5567KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1980 5 31 6 09/02/2026 moribund tree. previous work request not completed qtra adjusted accordingly Replace Tree 1 04-12
Months 4,000 [133289]
5567KRCA Roads Caprington
Avenue
Kilmarnock
Shortlees
Cherry -
Japanese
Cherry
1980 5 31 6 09/02/2026 moribund tree. previous work request not completed qtra adjusted accordingly Stump Grinding 1 01-04
Months 4,000 [133289]
Caprington
ave:1:a:Ash Roads Caprington
Avenue
Kilmarnock
Shortlees Ash 1970 15 54 8 13 03/02/2026 blockof Ash in progressive decline. deadwood overhanging footpath.  adb cat
range 2-4 Dismantle 1
remove allcat 3&4 trees within fallzone of public
access. trees in advanced state of declineoutwith
these areas can be monolithed to <4m
01-04
Months 10,000
LONG041 Roads Longhill Avenue Ayr Ash 1985 12 43 7 11/12/2025 Ash Dieback <70% defoliation. 25cm x.1.5m historic stem wound with surface
decay from South base. Light ivy Dismantle 1 04-12
Months 10,000
[48561,
48562,
121062,
121063]
86

Page 87

Official#
LONG043 Roads Longhill Avenue Ayr Ash 1960 11 45 9 10/12/2025 Co-dominant fork at 0.5m. Ash dieback approx 90% defoliation. Dismantle 1 01-04
Months 5,000
[48548,
121018,
121017]
LONG044 Roads Longhill Avenue Ayr Ash 1960 12 35 6 10/12/2025 Co-dominant fork at base.  Ash dieback approx 90% defoliation. Dismantle 1 01-04
Months 5,000
[48547,
121022,
121023]
NEW_9594_0002 Roads Longhill Avenue Ayr Oak - Pin Oak 1985 10 32 4 11/12/2025
Stem wound from base to approx 1.5m. Previously reduced.  Detatached
Cerioporus squamous brackets found at base and hung in lower branches.
Internal hollowing audible with sounding hammer.  Basal decay suspected.
Dismantle 1 See report. 01-04
Months 10,000 [121087,
121086]
87

Page 88

Official#
Tag Number Owner Location Region Species
Planting Year
Height (m)
DBH
(cm)
Crown Spread (m)
Tree Count
Last Inspection
Date Report Work
W
ork Quantity
Work Comments Work
Priority
QTRA
Score
Photo
Reference
A70 SACH:1:i:Ash SAC Highways A70 Road A Type Ash 1937 12 80 7 3 11/11/2025
3x ash trees moderate ivy cover on all three trees. Eastern most
treeis dead/dying ADB aporox30-40% defoliation on other two
trees.
Remove Ivy 2 Sever at base and remove to 3m on two remaining trees. 04-12
Months 5,000
A70 SACH:1:i:Ash SAC Highways A70 Road A Type Ash 1937 12 80 7 3 11/11/2025
3x ash trees moderate ivy cover on all three trees. Eastern most
treeis dead/dying ADB aporox30-40% defoliation on other two
trees.
Dismantle 1 East Ash in group, dwad standing  tree 01-04
Months 5,000
A713002 SAC Highways A713 Road A Type Ash 1963 14 58 8 04/12/2025
Branch fracture stub at approx 7m, east. Bifucates at approx 6m.
Light ivy on lower stem. ADB approx 25% defoliation. Instancesxod
deadwoid up aporox 15cm over footpath.
Deadwooding 1 Remove deadwoid >5cm diameter. 04-12
Months 5,000 [43219,
120072]
A714 SACH:1:e:Elm -
English Elm SAC Highways A714 Road A Type Elm - English
Elm 2000 6 20 1 5 13/08/2025 no observable change from previous assessment.  previous work
request not completed Fell 5 01-04
Months 5,000
A714 SACH:1:y:Ash SAC Highways A714 Road A Type Ash 1980 15 35 5 10 12/08/2025 no change from previous assessment. Dismantle 1 cat 4 and standing dead trees 01-04
Months 5,000
A714 SACH:1:y:Mixed
Broadleaves SAC Highways A714 Road A Type Mixed
Broadleaves 1980 11 45 7 30 12/08/2025 no change from previous assessment. Establish Owner 1 If not SAC, Area of land between themain road and layby loop set
back from road.
01-04
Months 5,000
A714 SACH:1:y:Mixed
Broadleaves SAC Highways A714 Road A Type Mixed
Broadleaves 1980 11 45 7 30 12/08/2025 no change from previous assessment. Contact Owner 1 If not SAC 01-04
Months 5,000
A714 SACH:1:y:Mixed
Broadleaves SAC Highways A714 Road A Type Mixed
Broadleaves 1980 11 45 7 30 12/08/2025 no change from previous assessment. Fell 1 chestnut next to craignells access drive with failed primary codom
union. stem hung up
01-04
Months 5,000
A714074 SAC Highways A714 Road A Type Ash 1944 15 80 10 03/09/2025 moribund tree.  bifurcated at 3m. moderate ivy to 5m Contact Owner 1 01-04
Months 10,000 [41457, 91586]
A714074 SAC Highways A714 Road A Type Ash 1944 15 80 10 03/09/2025 moribund tree.  bifurcated at 3m. moderate ivy to 5m Dismantle 1 01-04
Months 10,000 [41457, 91586]
A714090 SAC Highways A714 Road A Type Ash 1970 12 75 14 03/09/2025 no observable change from previous assessment adb cat 4,
moribund. Dismantle 1 01-04
Months 10,000 [42214, 91485]
A714090 SAC Highways A714 Road A Type Ash 1970 12 75 14 03/09/2025 no observable change from previous assessment adb cat 4,
moribund. Establish Owner 1 Possible farm owned trees, set 2m back from road, but to road side
of field wall.
01-04
Months 10,000 [42214, 91485]
A714090 SAC Highways A714 Road A Type Ash 1970 12 75 14 03/09/2025 no observable change from previous assessment adb cat 4,
moribund. Contact Owner 1 If not sac owned / responsibility 01-04
Months 10,000 [42214, 91485]
A719031 SAC Highways A719 Road A Type Ash 1943 9 55 10 09/12/2025 Inonotus hispidus bracket at approx 4m.  Crown showing
progressive decline. Dismantle 1 Inonotus hispidus 01-04
Months 5,000
[44604,
120298,
120297]
A759 SACH:1:d:Ash SAC Highways A759 Road A Type Ash 2000 10 45 10 15 10/12/2025 multistemmed mature mixed broadleaf linear group.  coppice
origin.  Ash component adb cat range 3&4.  historic management. Contact Owner 1
If on land belonging to quarry works.   Recommend - contact
quarry. Given how narrow the road is, coupled with its high use
and the need for Ash trees within neighbouring groups, on the
quarry side of the road, it may be prudent to remove the self set
Ash along this sectionas part of any scheduled works and whilst
traffic management is in place.
01-04
Months 10,000
A759 SACH:1:d:Ash SAC Highways A759 Road A Type Ash 2000 10 45 10 15 10/12/2025 multistemmed mature mixed broadleaf linear group.  coppice
origin.  Ash component adb cat range 3&4.  historic management. Establish Owner 1 Probably on land belonging to quarry works. 01-04
Months 10,000
A759 SACH:1:d:Ash SAC Highways A759 Road A Type Ash 2000 10 45 10 15 10/12/2025 multistemmed mature mixed broadleaf linear group.  coppice
origin.  Ash component adb cat range 3&4.  historic management. Fell 1 monolith all Ash 01-04
Months 10,000
A759004 SAC Highways A759 Road A Type Beech -
Common 1900 14 101 12 10/12/2025 previous work request not completed. Dismantle 1 00-01
Months 400 [51155,
120591]
A759013 SAC Highways A759 Road A Type Lime -
Common 1940 10 80 10 10/12/2025
10°E lean. could not confirm presence of kretzschmaria as per
previous assessment. dense ivy throughout moribund architecture
obscuring full assessment.
Dismantle 1 01-04
Months 4,000 [51118,
120568]
A759023 SAC Highways A759 Road A Type Sycamore 1963 10 50 10 10/12/2025 standing deadwood.  moderate ivy to 3m Dismantle 1 01-04
Months 4,000 [51134,
120563]
NEW_9555_0005 SAC Highways A759 Road A Type Alder -
Common 1980 10 25 5 10/12/2025 phytopthora colonisation.  weeping cankerous sores to 2m Dismantle 1 01-04
Months 5,000 [120590]
A79 SACH :1:a:Ash SAC Highways A79 Road A Type Ash 1987 12 40 5 22 09/12/2025
Ash dieback ranging from 10% to 65% defoliation.  Pine at northern
end of group is leaning and in contact with street light.  Ash at
northern end of group has Co-dominant fork with included bark
union.
Dismantle 1 Dismantle Ash tree to Northern end of group with Co-dominant
fork at 1.5m with included bark union.
01-04
Months 1,000
A79 SACH :1:a:Pine SAC Highways A79 Road A Type Pine 1987 10 30 5 4 09/12/2025
Ash dieback ranging from 10% to 65% defoliation.  Pine at northern
end of group is leaning and in contact with street light.  Ash at
northern end of group has Co-dominant fork with included bark
union.
Dismantle 1 Remove Pine wth 2 stems, one ether side of light column R11 01-04
Months 1,000
South Ayrshire
88

Page 89

Official#
A79013 SAC Highways A79 Road A Type
Cherry -
Himalayan
Cherry
1970 6 35 6 12/11/2025 Tree is in late stage terminal decline. Dismantle 1 01-04
Months 5,000 [43253,
112494]
A79014 SAC Highways A79 Road A Type Cherry - Wild
Cherry Gean 1970 6 44 7 11/11/2025 Tree is terminal decline, aporox 80% crown death. Replace Tree 1 12-24
Months 5,000 [43252,
112498]
A79014 SAC Highways A79 Road A Type Cherry - Wild
Cherry Gean 1970 6 44 7 11/11/2025 Tree is terminal decline, aporox 80% crown death. Dismantle 1 01-04
Months 5,000 [43252,
112498]
B7023 SACH:1:b:Ash SAC Highways B7023 Road B Type Ash 1980 15 45 8 100 06/11/2025
Posdible 3rd party trees, liner group of multistemmed coppice
origin mixed broadleaves, approx 80% Ash trees. ADB present
throughout with up to 90% defoliation. Approx 3x fractured hung
up small diameter, <20cm, stem in central area of group.
Contact Owner 60 Establish ownership and if necessary inform owners of their duty of
care
01-04
Months 5,000
B7023 SACH:1:b:Ash SAC Highways B7023 Road B Type Ash 1980 15 45 8 100 06/11/2025
Posdible 3rd party trees, liner group of multistemmed coppice
origin mixed broadleaves, approx 80% Ash trees. ADB present
throughout with up to 90% defoliation. Approx 3x fractured hung
up small diameter, <20cm, stem in central area of group.
Fell 1 Approx 60 ash stems w8th >50% defoliation, as well as hung up
dead stems in centralmarea of group.
01-04
Months 5,000
B723013 SAC Highways B7023 Road B Type Pine - Scots
Pine 1944 18 95 15 24/11/2025
historic basalcavity to 2m. extensive hollowing. 5°W lean. mature
tree located on embankment unsuitable location . significant
deadwood overhanging road with recent historic secondary
failures. previous work request not completed
Dismantle 1 00-01
Months 400
[41943,
116532,
116530,
116531]
B7024 SACH:1:b:Ash SAC Highways B7024 Road B Type Ash 1950 18 70 6 10 09/11/2025
3rd party Mixed broadleves woodland set back from road in a de-
elevated location, viewed from roadside. Multiple ash trees with
ADB and dead elm stems throughout group. All ash trees excepted
two are <40% defoliation, 2x ash tree, both towards the northern
end of group have >60% defoliation. Approx 9x dead elm stems
Contact Owner 2 Establish ownership and if necessary inform owners of their duty of
care.
04-12
Months 10,000
B7024 SACH:1:b:Ash SAC Highways B7024 Road B Type Ash 1950 18 70 6 10 09/11/2025
3rd party Mixed broadleves woodland set back from road in a de-
elevated location, viewed from roadside. Multiple ash trees with
ADB and dead elm stems throughout group. All ash trees excepted
two are <40% defoliation, 2x ash tree, both towards the northern
end of group have >60% defoliation. Approx 9x dead elm stems
Dismantle 2 2x ash trees towards Northern end of group with >60% defoliation. 04-12
Months 10,000
B7024 SACH:1:b:Elm -
Dutch Elm SAC Highways B7024 Road B Type Elm - Dutch
Elm 1950 18 70 7 9 09/11/2025
3rd party Mixed broadleves woodland set back from road in a de-
elevated location, viewed from roadside. Multiple ash trees with
ADB and dead elm stems throughout group. All ash trees excepted
two are <40% defoliation, 2x ash tree, both towards the northern
end of group have >60% defoliation. Approx 9x dead elm stems
Dismantle 9 9 x dead standing Elms. 04-12
Months 10,000
B7024 SACH:1:b:Elm -
Dutch Elm SAC Highways B7024 Road B Type Elm - Dutch
Elm 1950 18 70 7 9 09/11/2025
3rd party Mixed broadleves woodland set back from road in a de-
elevated location, viewed from roadside. Multiple ash trees with
ADB and dead elm stems throughout group. All ash trees excepted
two are <40% defoliation, 2x ash tree, both towards the northern
end of group have >60% defoliation. Approx 9x dead elm stems
Contact Owner 9 Establish ownership and if necessary inform owners of their duty of
care
04-12
Months 10,000
B735002 SAC Highways B7035 Road B Type Beech -
Common 1930 15 85 12 03/09/2025 previous work request not completed,  dense ivy restricting full
architectural assessment. ganoderma established N at root collar Remove Ivy 1 Remove all ivy. 01-04
Months 4,000
[44354, 44353,
91758, 91759,
91760, 91761]
B735003 SAC Highways B7035 Road B Type Beech -
Common 1970 12 65 10 03/09/2025
basal cavity S . historic loss of codom stem E 1m. gandoderma
brackets established N with new fruiting bodies emerging. previous
work request not completed
Dismantle 1 00-01
Months 1,000 [44359, 44358,
44357]
B730032 SAC Highways B730 Road B Type Ash 1937 16 72 10 09/12/2025
moderate ivy throughout architecture restricting full assessment. 
10°NE lean over road. poor taper canopy weighted over road.
significant secondary historic failure, hung up SE. adb cat 3
Dismantle 1 01-04
Months 4,000 [45154,
120271]
B730032 SAC Highways B730 Road B Type Ash 1937 16 72 10 09/12/2025
moderate ivy throughout architecture restricting full assessment. 
10°NE lean over road. poor taper canopy weighted over road.
significant secondary historic failure, hung up SE. adb cat 3
Remove Ivy 1 Sever ivy, base to 2m, to facilitate next inspection. 01-04
Months 4,000 [45154,
120271]
B730032 SAC Highways B730 Road B Type Ash 1937 16 72 10 09/12/2025
moderate ivy throughout architecture restricting full assessment. 
10°NE lean over road. poor taper canopy weighted over road.
significant secondary historic failure, hung up SE. adb cat 3
Contact Owner 1 01-04
Months 4,000 [45154,
120271]
B730039 SAC Highways B730 Road B Type Poplar - Hybrid
Poplar 1950 25 120 25 09/12/2025 multistemmed from 3m. significant deadwood throughout
architecture.  branch fracture 18m E overhanging road Deadwooding 1 Remove deadwood over 3cm diameter x 30cm in length. 00-01
Months 1,000
[45187,
120228,
120227,
120226]
89

Page 90

Official#
B730039 SAC Highways B730 Road B Type Poplar - Hybrid
Poplar 1950 25 120 25 09/12/2025 multistemmed from 3m. significant deadwood throughout
architecture.  branch fracture 18m E overhanging road Limb - Remove 1 remove fractured and hanging limb 00-01
Months 1,000
[45187,
120228,
120227,
120226]
B730047 SAC Highways B730 Road B Type Beech -
Common 1944 12 70 7 27/11/2025
compacted and suppressed rootzone.  bifurcated codom stems
from base.  natural bracing to 2m. significant dieback in canopy
overhanging road
Deadwooding 1 Remove upper dead stems and minor dead stem in Beech to
immediate North.
01-04
Months 10,000 [44737,
118435]
B730047 SAC Highways B730 Road B Type Beech -
Common 1944 12 70 7 27/11/2025
compacted and suppressed rootzone.  bifurcated codom stems
from base.  natural bracing to 2m. significant dieback in canopy
overhanging road
Pollard 1 01-04
Months 10,000 [44737,
118435]
B730058 SAC Highways B730 Road B Type
Whitebeam -
Swedish
WBeam
1969 8 55 5 09/12/2025 fluting stem. ganoderma brackets @0.5m. previous work request
not completed Replace Tree 1 01-04
Months 4,000 [45179,
120242]
B730058 SAC Highways B730 Road B Type
Whitebeam -
Swedish
WBeam
1969 8 55 5 09/12/2025 fluting stem. ganoderma brackets @0.5m. previous work request
not completed Dismantle 1 01-04
Months 4,000 [45179,
120242]
B734 SACH:1:h:Elm -
English Elm SAC Highways B734 Road B Type Elm - English
Elm 1985 9 35 3 20 30/08/2025 Standing deadwood on roadside. previous work request not
completed Other (Specify) 1 Change owner to other 01-04
Months 10,000
B734 SACH:1:h:Elm -
English Elm SAC Highways B734 Road B Type Elm - English
Elm 1985 9 35 3 20 30/08/2025 Standing deadwood on roadside. previous work request not
completed Fell 20 Remove all dead and dying Elms, multiple stems 01-04
Months 10,000
B734 SACH:1:h:Elm -
English Elm SAC Highways B734 Road B Type Elm - English
Elm 1985 9 35 3 20 30/08/2025 Standing deadwood on roadside. previous work request not
completed Contact Owner 1 01-04
Months 10,000
B734 SACH:2:d:Ash SAC Highways B734 Road B Type Ash 1918 25 95 10 4 01/09/2025 adb rangefrom cat 2 to standing deadwood.  previous work
request not completed Contact Owner 1 01-04
Months 10,000
B734 SACH:2:d:Ash SAC Highways B734 Road B Type Ash 1918 25 95 10 4 01/09/2025 adb rangefrom cat 2 to standing deadwood.  previous work
request not completed Dismantle 3
2nd Ash from West, largest in group, 90cm DBH x 14m tall. 2 stems
from 3.5m East stem lost cavity visible to East base of remaining
stem with stem morphology indicating cavity extends downwards
to at least 2m below union. Crown biased over road. Dismantle. 
Wesstern Ash 2 stems from base, slight lean Northeast to field.
70% crown death, dismantle.  second Ash from East, severe adb
defoliation >65%.
01-04
Months 10,000
B734074 SAC Highways B734 Road B Type Beech -
Common 1880 18 100 18 31/08/2025 fissure progessing at primary union of S stem 2m . no other
changes to previous assessment Pollard 1 01-04
Months 10,000 [41528, 91176,
91177]
B734075 SAC Highways B734 Road B Type Ash 1880 20 95 15 31/08/2025 adb cat 3. previous work request not completed Other (Specify) 1 See report flag to sach. 01-04
Months 10,000 [41573, 91175]
B734075 SAC Highways B734 Road B Type Ash 1880 20 95 15 31/08/2025 adb cat 3. previous work request not completed Dismantle 1 Reduce to 5m stag horned monolith. 01-04
Months 10,000 [41573, 91175]
NEW_8146_0001 SAC Highways B734 Road B Type Beech -
Common 1930 15 80 15 01/09/2025
bleeding cankerous rust exudate around lower bole. suppressed
root development roadside and compaction fields side with sitting
water at fenceline. canopy windermere favouring E over road, 75%
canopy loss
Dismantle 1 01-04
Months 10,000 [91876, 91875,
91877]
B739012 SAC Highways B739 Road B Type Ash 1940 12 80 15 08/12/2025
adb cat 4. in terminal decline. significant deadwood throughout
architecture overhanging road.  hollowing of stem and secondary
architecture.  historic limb failures SE 3M NE 2m.
Other (Specify) 1 BS8596 reqd. Monolith at 4m after cavities have been inspected
for protected species. retain features where possible.
01-04
Months 4,000 [53038,
120127]
B741 SACH :1:d:Ash SAC Highways B741 Road B Type Ash 1998 10 40 5 30 18/09/2025 dense boundary mixed broadleaf group Ash component adb cat
range from 3-standing deadwood Fell 1 Owner to remove all Ash with defoliation greater than 55%. 01-04
Months 5,000
B741 SACH :1:d:Ash SAC Highways B741 Road B Type Ash 1998 10 40 5 30 18/09/2025 dense boundary mixed broadleaf group Ash component adb cat
range from 3-standing deadwood Contact Owner 1 If not sac responsibility 01-04
Months 5,000
B741 SACH :1:f:Ash SAC Highways B741 Road B Type Ash 1995 9 34 2 100 18/09/2025 mixed broadleaf group Ash component adb cat range 4-standing
deadwood Fell 80 Remove all Ash with defoliation greater than 55%, currently approx
80 x stems.
01-04
Months 5,000
B741 SACH :1:f:Ash SAC Highways B741 Road B Type Ash 1995 9 34 2 100 18/09/2025 mixed broadleaf group Ash component adb cat range 4-standing
deadwood Contact Owner 1 If not sac responsibility 01-04
Months 5,000
B741 SACH :1:g:Ash SAC Highways B741 Road B Type Ash 1999 10 25 5 150 18/09/2025 mixed broadleaf group Ash component adb cat range 4-standing
deadwood Contact Owner 1 01-04
Months 5,000
B741 SACH :1:g:Ash SAC Highways B741 Road B Type Ash 1999 10 25 5 150 18/09/2025 mixed broadleaf group Ash component adb cat range 4-standing
deadwood Fell 100 Fell all Ash with defoliation greater thn 55% curently approx 100 x
stems.
01-04
Months 5,000
B741027 SAC Highways B741 Road B Type Ash 1882 18 100 18 29/09/2025 dense ivy throughout primary architecture.  adb cat 4 Deadwooding 1 Remove deadwood over 4cm diameter x 35cm over main raod and
side road.
01-04
Months 4,000 [41776, 98217]
B741027 SAC Highways B741 Road B Type Ash 1882 18 100 18 29/09/2025 dense ivy throughout primary architecture.  adb cat 4 Other (Specify) 1 monolith to primary union 3m 01-04
Months 4,000 [41776, 98217]
B741027 SAC Highways B741 Road B Type Ash 1882 18 100 18 29/09/2025 dense ivy throughout primary architecture.  adb cat 4 Contact Owner 1 01-04
Months 4,000 [41776, 98217]
B741054 SAC Highways B741 Road B Type Oak - Common 1940 11 90 10 15/09/2025 standing deadwood.  High habitat value. previous work request not
completed Dismantle 1 monolith to primary union and retain stem for biodiversity.
BS8596, MEWP and TM reqd
01-04
Months 400 [45073, 94729]
B741089 SAC Highways B741 Road B Type Cherry - Wild
Cherry Gean 1980 8 35 5 18/09/2025 moribund NWtree in small group of 3 Fell 1 00-01
Months 1,000 [44464, 96306]
90

Page 91

Official#
B741135 SAC Highways B741 Road B Type Elm - English
Elm 1999 5 20 3 18/09/2025 failed and hungup in adjacent tree Contact Owner 1 01-04
Months 5,000 [41709, 96217]
B741135 SAC Highways B741 Road B Type Elm - English
Elm 1999 5 20 3 18/09/2025 failed and hungup in adjacent tree Fell 1 Adjacent to bt post 01-04
Months 5,000 [41709, 96217]
B741155 SAC Highways B741 Road B Type Ash 1997 10 30 5 17/09/2025 standing deadwood Contact Owner 1 01-04
Months 5,000 [45048, 95871]
B741155 SAC Highways B741 Road B Type Ash 1997 10 30 5 17/09/2025 standing deadwood Dismantle 1 01-04
Months 5,000 [45048, 95871]
NEW_9253_0004 SAC Highways B742 Road B Type Ash 1930 12 75 10 24/11/2025 moribund tree, moderate ivy throughout architecture restricting
full architectural assessment Other (Specify) 1 monolith at primary union 00-01
Months 1,000 [116543]
B743 SAC:1:b:Ash SAC Highways B743 Road B Type Ash 2000 15 25 6 15 27/11/2025
woodland boundary ash group extending either side of drive to
Auchenfail. adb cat 3&4. group pressure results in attenuated
development
Fell 1 all Ash within 1 treelength of road 01-04
Months 10,000
B743 SAC:1:b:Ash SAC Highways B743 Road B Type Ash 2000 15 25 6 15 27/11/2025
woodland boundary ash group extending either side of drive to
Auchenfail. adb cat 3&4. group pressure results in attenuated
development
Contact Owner 1 01-04
Months 10,000
B743046 SAC Highways B743 Road B Type Beech -
Common 1960 15 100 10 03/12/2025
Kretzschmaria deusta visible fruiting around Eastern root collar.
Eastern basal flank of stem, approx 1.2m across and up to 1.5m,
roughly triangular, is visibly darker in colour with Red like hue.
Dark exuding lesions emenating from the bark within this
described area. 12cm diameter historic pruning wound cav at 1.7m
North, roadside, approx 30cm deep, Kretzschmaria duest visible
within cav. 1.7m slightly diagonal upward turning from West to
East and from Northwest base, strongly indented and exposed
wound. 2 x 30cm, very close, branches lost at 3m East with 1m
dead stubs. 30cm diameter secondary upright at 4.4m North, over
road, is dead. Main stem has slight bias to South, almost all of the
remaining crown, which is in visible state of terminal decline, is
biased over the field to the South and East. Given exposure to
Westerly, and this being prevailing wind direction, basal stem
failure, is likely to be toward field and / or parallel to Eastern verge
of West bound lane.
Dismantle 1 01-04
Months 10,000 [45114, 45115,
119640]
B744031 SAC Highways B744 Road B Type Ash 1940 14 80 9 09/12/2025
25cm di branch loss wound at 3m East. Stem becomes biased over
road, crown 70/30 biased over road. Approx 5cm branch loss cav at
3.7m Southwest approx 0.6m below primary bifurcated union,
swelling to South side of cavity region, insicates stem hollowing.
Minor Eastern branching below wound, then East side of crown is
dead. Remaining Western crown I retrenching. Suspeced Inonotus
hispidus clonisation and adb present, defoliation >75%.
Dismantle 1 Significant deadwood above road. Progressive state of decline. 01-04
Months 10,000
[45108,
120366,
120365,
120364]
NEW_9398_0001 SAC Highways B744 Road B Type Beech -
Common 1900 15 100 10 26/11/2025
bifurcated codom stems from 1.6m. historic N stem failure.
moderate ivy throughout architecture.  multiple ganoderma
brackets observed around root collar
Contact Owner 1 01-04
Months 4,000
[118403,
118404,
118405,
118406]
NEW_9398_0001 SAC Highways B744 Road B Type Beech -
Common 1900 15 100 10 26/11/2025
bifurcated codom stems from 1.6m. historic N stem failure.
moderate ivy throughout architecture.  multiple ganoderma
brackets observed around root collar
Other (Specify) 1 monolith at 2m 01-04
Months 4,000
[118403,
118404,
118405,
118406]
B749005 SAC Highways B749 Road B Type Sycamore 1930 6 75 4 08/12/2025 historic primary failure at 7m. dense ivy restricting full
architectural assessment Dismantle 1 01-04
Months 4,000 [53040,
120163]
B750002 SAC Highways B750 Road B Type Beech -
Common 1940 10 68 7 11/12/2025 kretzschmaria deusta S base. crown in state of progressive decline.
previous work request not completed Contact Owner 1 01-04
Months 4,000
[53055, 53054,
120936,
120937]
B750002 SAC Highways B750 Road B Type Beech -
Common 1940 10 68 7 11/12/2025 kretzschmaria deusta S base. crown in state of progressive decline.
previous work request not completed Dismantle 1 01-04
Months 4,000
[53055, 53054,
120936,
120937]
NEW_5519_0003 SAC Highways C120 Road C Type Ash 1970 8 60 5 09/12/2025 moribund hedgerow ash. Pollard 1 BS8596 reqd prior to works 01-04
Months 4,000 [57264,
120208]
NEW_5519_0003 SAC Highways C120 Road C Type Ash 1970 8 60 5 09/12/2025 moribund hedgerow ash. Contact Owner 1 01-04
Months 4,000 [57264,
120208]
NEW_5519_0010 SAC Highways C120 Road C Type Ash 1980 13 80 6 09/12/2025 adb cat 3. moderate deadwood overhanging road Contact Owner 1 01-04
Months 4,000 [57269, 57268,
120219]
91

Page 92

Official#
NEW_5519_0010 SAC Highways C120 Road C Type Ash 1980 13 80 6 09/12/2025 adb cat 3. moderate deadwood overhanging road Pollard 1 01-04
Months 4,000 [57269, 57268,
120219]
NEW_5519_0013 SAC Highways C120 Road C Type Ash 1965 15 89 10 09/12/2025 bifurcated codom stems from base.  included non uniform primary
union. adb cat 3 Pollard 1 01-04
Months 10,000 [57272,
120216]
NEW_5519_0013 SAC Highways C120 Road C Type Ash 1965 15 89 10 09/12/2025 bifurcated codom stems from base.  included non uniform primary
union. adb cat 3 Contact Owner 1 01-04
Months 10,000 [57272,
120216]
NEW_5720_0075 SAC Highways C29 Road C Type Beech -
Common 1945 17 90 10 14/09/2025 standing deadwood.  previous work request not completed Other (Specify) 1
monolith to primary union to remove risk to road. retain arisings
for biodiversity and habitat.  TM reqd, BS8596 reqd, MEWP reqd.
Work during winter months
00-01
Months 400 [58170, 94241]
NEW_5720_0075 SAC Highways C29 Road C Type Beech -
Common 1945 17 90 10 14/09/2025 standing deadwood.  previous work request not completed Contact Owner 1 00-01
Months 400 [58170, 94241]
NEW_5721_0080 SAC Highways C29 Road C Type Ash 1984 15 35 5 15/09/2025 no observable change from previous assessment adb cat 4.
previous work request not completed Establish Owner 1 01-04
Months 10,000 [58255, 94659]
NEW_5721_0080 SAC Highways C29 Road C Type Ash 1984 15 35 5 15/09/2025 no observable change from previous assessment adb cat 4.
previous work request not completed Fell 1 TM reqd. BS8596 reqd 01-04
Months 10,000 [58255, 94659]
NEW_5722_0001 SAC Highways C29 Road C Type Ash 1980 14 4 5 15/09/2025 moribund tree Contact Owner 1 01-04
Months 5,000 [58258, 94647]
NEW_5722_0001 SAC Highways C29 Road C Type Ash 1980 14 4 5 15/09/2025 moribund tree Dismantle 1 TM reqd bs8596 reqd MEWP reqd.  monolith at primary union to
remove risk to road. retain for habitat
04-12
Months 5,000 [58258, 94647]
NEW_5723_0062 SAC Highways C29 Road C Type Ash 1990 7 20 2 16/09/2025 standing deadwood dense ivy Dismantle 1 TM reqd. BS8596 reqd. works to be undertaken through winter
months
00-01
Months 5,000 [58343, 95419]
NEW_5723_0062 SAC Highways C29 Road C Type Ash 1990 7 20 2 16/09/2025 standing deadwood dense ivy Contact Owner 1 01-04
Months 5,000 [58343, 95419]
NEW_5723_0069 SAC Highways C29 Road C Type Ash 1999 6 20 2 16/09/2025 standing deadwood,  dense ivy Dismantle 1 TM reqd. BS8596 reqd 01-04
Months 5,000 [58347, 95367]
NEW_5723_0069 SAC Highways C29 Road C Type Ash 1999 6 20 2 16/09/2025 standing deadwood,  dense ivy Contact Owner 1 01-04
Months 5,000 [58347, 95367]
92

Page 93

Official
AYRSHIRE SHARED SERVICE JOINT COMMITTEE
13 March 2025
Report by the Head of Roads - Ayrshire Roads Alliance  
_________________________________________________________________
AYRSHIRE ROADS ALLIANCE
IMPROVEMENT ACTION PLAN
________________________________________________________________
PURPOSE OF REPORT
1. The purpose of this Report is to advise the Joint Committee on the management
of the Improvement Action Plan by the Ayrshire Roads Alliance.
RECOMMENDATIONS
2. It is recommended that the Joint Committee:
i. Notes the Improvement Action Plan presented in this report;
iii. Continues to receive updates on progress; and
iv. Otherwise, notes the content of the report.
BACKGROUND
3. The purpose of the report is to provide regular updates on the Improvement
Action Plan.  This ensures that the actions are monitored and scrutinised at a
minimum of a quarterly basis and is contained in Appendices 1-3.
MAIN REPORT/MAIN ISSUES
4. This Improvement Action Plan is collated by the Head of Service and used to:
• monitor the progress in meeting the Ayrshire Roads Alliance’s
objectives;
• help managers to continually review the actions and progress to date;
and
• identify any risk / problem areas that need addressed regarding the
Improvement Action Plan.
5. ARA’s Digital Improvement Programme of work in collaboration with TrueView
Visuals continues with work recently completed on Additional Support Needs
(ASN) Transport and Professional Design modules in conjunction with other
Council Services across both South and East Ayrshire. These new modules
will go live soon.
6. There has been significant interest recently in these new and other existing
digital modules from other Local Authorities and through the Commercial
Agreement established between both Councils and TrueView Visuals a
Agenda Item 6
93

Page 94

Official
percentage share of any sales of these jointly developed modules will be
received. 
7. In December 2025 East Ayrshire Cabinet approved a negotiated direct award
between East Ayrshire Council abd TrueView Visuals for a four year term and
two optional one year extensions which will formalise this highly successful
partnership and allow ARA and other Council Services to move forward with
more digital enhancements. 
8.      Ayrshire Roads Alliance continues to assist South Ayrshire Council with the
delivery of the Ayrshire Growth Deal projects and meet colleagues from SAC
regularly to update progress. 
9.      In respect of the Public EV Charging, Pan Ayrshire Concession Contract
tenders were returned in  January 2026 and evaluation and approval is
ongoing with tender award scheduled for March 2026. Further updates will be
provided to both Cabinets and to North Ayrshire Council once the
procurement process has been finalised. 
10. Phases 1-3 of the roll out of 20mph speed limits in villages in South Ayrshire
have been completed and work is now ongoing on Phase 4 which will include
the larger settlements of Coylton, Maybole and Girvan. Phase 5 in future
years will then consider the towns of Troon, Prestwick and Ayr. 
11. In October East Ayrshire cabinet gave approval for ARA to progress with trials
of 20mph speed limits in New Cumnock, Mauchline, Kilmaurs and
Crookedholm. The trial in Crookedholm commenced on 20 February 2026.
New Cumnock will commence 06 March 2026 and Mauchine will commence
13 March 2026. Both these projects will be implemented at the same time as
the introduction of similar restrictions on the A76 trunk by Transport Scotland.
Kilmaurs will follow in April/ May 2026. 
12.      Following approval of Ayrshire Roads Alliance Pavement Parking
Enforcement reports by both Cabinets, enforcement commenced with a soft
approach followed by full enforcement in South Ayrshire from 1st May 2025
and in East Ayrshire from 1st June 2025. There has been good compliance
with the new restrictions in both authority areas and officers have completed
further reviews following receipt of requests for further exemptions in both
areas. Further reports detailing these findings will be presented to both
Cabinets in April/May 2025. 
13. The Active Travel Member Officer Working Group  established in South
Ayrshire continues to meet 6 weekly as do the Community Action Groups.
These meetings are supported by SAC’s Thriving Communities team. The
Ayrshire Roads Alliance are currently working in partnership with East
Ayrshire Leisure to finalise the East Ayrshire Active Travel Strategy (EAATS) 
and the the Active Travel Forum has been re-established to better co-ordinate
projects being delivered by individual services. A Community Engagement
Group will also be formed to provide a structured mechanism for the public to
help shape Active Travel in East Ayrshire.  
94

Page 95

Official 
14. South Ayrshire Council successfully secured £20m from the Levelling Up
Fund and ARA will deliver £15m worth of improvements to Burns Statue
Square, Ayr. The reminder is being used by ARA along with ATIF funding to
construct a new Active Travel Route linking Dundonald to Barassie where
work is underway and for improvements to the NCN7 route between Prestwick
and Barassie station due to commence later this year. 
15. IMPLICATIONS 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning Yes  13&14
2. Governance Yes  15
3. Human Resources  No 16
4. Equality and Fairer Scotland Duty Yes  17
5. Financial Yes  18
6. Risk Yes  19
7. Community Wealth Building Yes  20
8. Net Zero Yes  21 
POLICY/STRATEGIC PLANNING IMPLICATIONS 
13. A well-maintained road network will contribute to achieving the 2015-2030
Community Plan objectives and associated 2021-2024 Delivery Plans. 
14.    The matters referred to in this report contribute to Priority 1 of the South Ayrshire
Council Plan: Spaces and Places/ Moving around and the environment
(Outcome 1). 
GOVERNANCE IMPLICATIONS 
15. The Improvement Action Plan is a management tool and this will not replace the
existing statutory returns for risk and performance related information. 
HUMAN RESOURCES IMPLICATIONS 
16. The Improvement Action Plan has no direct impact on human resources. 
EQUALITY IMPACT AND FAIRER SCOTLAND DUTY IMPLICATIONS 
17. The Improvement Action Plan complements the Equality Impact Assessment by
ensuring that any issues arising are adequately prioritised, managed and either
eliminated or mitigated. 
95

Page 96

Official
FINANCIAL IMPLICATIONS 
18.  The Improvement Action Plan facilitates the existing scrutiny arrangements to
manage, prioritise, and review the budget provided by East Ayrshire Council and
South Ayrshire Council to the Ayrshire Roads Alliance 
RISK IMPLICATIONS 
19.  The Improvement Action Plan assists in the prioritisation of risks that need to be   
mitigated by the Ayrshire Roads Alliance in order to reduce the overall risk to
either Council and to comply with the Community Plan/Council Plan in both
partner bodies.  
COMMUNITY WEALTH BUILDING IMPLICATIONS 
20. The Improvement Action Plan supports economic levers to develop resilient,
inclusive local economies with more local spend and fair employment, as well as
ensuring that wealth is more locally owned and benefits local people. 
NET ZERO IMPLICATIONS 
21.  The Ayrshire Roads Alliance Improvement Action Plan and Carbon Strategy
supports and links to East Ayrshire Climate Strategy Themes; 
Theme 2: Transport
Theme 4: Natural Environment 
Jane Corrie
Head of Roads – Ayrshire Roads Alliance
21st August 2025 
BACKGROUND PAPERS 
Ayrshire Roads Alliance Service Plan 2025/26 
LIST OF APPENDICES 
1. Ayrshire Roads Alliance Improvement Action Plan
2. East Ayrshire Council Strategic Priorities 2025/26 
3. South Ayrshire Council Strategic Priorities 2025/26 
Person to contact: Jane Corrie, Head of Roads - Ayrshire Roads Alliance
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation officer: Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org
96

Page 97

Official
APPENDIX 1 - AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2025/26 
Action  Success Criteria/ Desired Outcome  Responsible  Timescale  Details
1 Continue to use the integrated
Roads Asset Management
Plan across the Ayrshire
Roads Alliance.
There is one Asset Plan for the Service
delivering a risk based approach for full
service delivery
Head of Service Completed Document has been presented to Joint
committee and will be reviewed annually.
2 Continue to prepare details for
developing an integrated Local
Transport Strategy.
A Strategy covering both Council areas,
which will involve consultation with
stakeholders. Information will be
gathered to inform the future Local
Transport Strategy. 
Continue to contribute to the Scottish
National Transport Strategy, Regional
Transport Strategy and Strategic
Transport Projects Review work.
Head of Service  Ongoing The Regional Transport Strategy, through SPT,
on which the Alliance has Board membership,
has now been published. 
The Local Transport Strategy will now be
progressed during 2026/27.
3 Action the Flood Risk
Management Plan
Inform the next national cycle of
potential flood risk management
schemes beyond 2022. 
Complete schemes and undertake
studies.
Head of Service  Complete 
March 2026
Reports submitted to both Cabinets Early 2023 
New Cumnock Flood Defences Complete 
Flood studies for Doon and River Ayr and the
Troon Coastal Flood study are complete. 
Work on the River Irvine and Pow Burn flood
studies is ongoing. 
97

Page 98

Official 
Action  Success Criteria/ Desired Outcome  Responsible  Timescale  Details
4 Improve the condition of the
road network.
Improve annual roads survey results
which are part of the SRMCS work.
Ensure the Alliance undertakes more
proactive maintenance.
Head of Service  Site works will
be undertaken
throughout
2025/26.
Key dependencies are the Road Improvement
Plans approved by the relevant Committees in
East Ayrshire and South Ayrshire in spring
2025. Progress is provided to members, and
relevant Committees.
5 Ensure the road network remains
safe through raising awareness
and improving road safety
through education, engineering
and enforcement.
Reduce road accidents in line with
government targets.
Provide appropriate traffic management
schemes and initiatives.
Strategic Manager  March 2026 Scottish Government and SCOTS guidance is
used. A key dependency is the Road
Improvement Plans which are presented to
Cabinet each year.
6 Improve the condition of the
bridge stock.
Improve bridge condition index. Reduce
the number of weight restricted bridges.
Complete all general, special and
principal bridge inspections.
Strategic Manager  March 2026 Through the Road Asset Management Plan.
Key dependencies are Road Improvement
programmes approved by Committees in East
Ayrshire and South Ayrshire in spring 2025. 
Deliver the capital and revenue programmes.
7 Manage and improve the street
lighting asset and install energy
efficient lighting schemes.
Maintain high standard of fixing dark
street lights. Complete the LED lighting
replacement programme in both East
Ayrshire and South Ayrshire.
Head of Service  October 2026 Through the Road Asset Management Plan,
with additional funding being provided to
commence the LED programme. 
At present performance is 98% of street lights
are now LED in EAC; and 100% in SAC. On
target for completion within timescales.
8 Maximise and deliver externally
funded sources of work
Identify external funding sources and
deliver work on time and on budget.
Improve infrastructure; and contribute to
improving the condition of the
network.
Head of Service  Works will be
undertaken
throughout
2025/26.
External sources, including Timber Transport,
Transport Scotland Active Travel Infrastructure
Tier 1 and Tier 2 Funding, SPT, SUSTRANS
Scottish Government, Ayrshire Growth Deal &
Levelling Up Fund
98

Page 99

Official 
Action  Success Criteria/ Desired Outcome  Responsible  Timescale  Details
9 Implementation of Parking
Strategy
Develop Head of Service Ongoing
through
2025/26
Amendments to TRO’s, lining, signing and 
residential parking permits and implementing 
an improved process using digital technology 
10 Prepare Service Plan Publish Head of Service Annual East Ayrshire Council Community Plan. South
Ayrshire - Local Outcomes Improvement Plan
and Local Place Plans. Regular updates will be
provided to joint committee.
11 Continue to review insurance
costs and insurance issues.
Review current practices to minimise
insurance costs.
Head of Service Complete Ayrshire Roads Alliance Monthly Insurance
Report. 
There is good dialogue with the Risk &
Insurance to ensure our work improves the
number of repudiated claims. The number of
claims has greatly reduced due to the
implementation of the new Code of Practice.
12 Review Depots and
Accommodation
Continue to review in 2024/25 from initial
work was completed in 2017 as a result
of amended working practices.
Head of Service Complete Joint Committee Reports of November 2016. 
Although initial work has been completed we
continue to strive to make depot and
accommodation cost savings. Further work will
continue on this as a result of COVID and the
return to office space during 2022/23. 
13 Review vehicle and plant costs Continue to review in 2021/22 from initial
work that was completed in 2017.
Head of Service  March 2026 The service will continue to review the fleet
requirements through the use of utilization
reports and improvements to the management of
the Vehicle Replacement Plan. 
14 Monitor and exercise Business
Continuity Plans
Improved resilience. Business Support
Manager
Review and
update
following
Existing East Ayrshire and South Ayrshire
Council plans
99

Page 100

Official 
Action  Success Criteria/ Desired Outcome  Responsible  Timescale  Details    
Relevant local
and national
events. 
15 Continue to use the Roads
Costing System to its full
potential.
Improve service performance from both
an on-site and financial perspective.
Business Support
Manager
Ongoing Revised roads costing system was fully
operational from November 2018. 
The system continues to be used to monitor
performance and work is ongoing to implement
digital timesheets linked to the Roads Costing
System.
16 Support and contribute to the
Ayrshire Growth Deal
Project Management of Roads Delivery
Projects.
Head of Service  Ongoing Ayrshire Roads Alliance is leading with the
planning and delivery of the Ayrshire Growth
Deal road improvement proposals and assisting
with the enabling infrastructure requirements of
the Commercial Build proposition.
17 Regional Transport Strategy Successfully contribute to the
preparation of this work being led by
SPT. The Alliance has Board
representation.
Head of Service Complete SPT documents and existing Regional
Transport Strategy
18 Regional Transport Appraisal Ensure the various projects identified
as part of this work are included in the
Strategic Transport Projects Review.
Head of Service Complete Transport Scotland has published the final
STPR2 with delivery programme to be
published.
19 National Transport Strategy East Ayrshire and South Ayrshire
Councils contribute to this process to
ensure the sustainable transport
hierarchy and sustainable investment
hierarchy are delivered.
Head of Service Complete In recognition of the anticipated increase in
Active Travel work, it is proposed that a
member of staff is dedicated directly to this
work.
100

Page 101

Official
20 National Transport Strategy –
review of Governance
East Ayrshire and South Ayrshire
Councils contribute to this process to
ensure that the
outcome/output meets the
Head of Service  Complete National Transport Strategy
21 Transport (Scotland) Bill –
Pavement Parking ban
East Ayrshire and South Ayrshire
Councils contribute to this process to
ensure a pragmatic approach is taken in
delivering the pavement parking ban in
both Council areas
Head of Service  Late 2026 Pavement Parking enforcement has commenced.
A large number of Exemption Order requests in
both authority areas have been reviewed.
Committee Papers will be submitted April/May
2026 with implementation anticipated late 2026. 
22 Digital Transformation  Develop modules to deliver end to end
digital processes 
Business Support
Manager
Ongoing TTRO applications –Implemented 
TRIPS – Implemented 
Traffic Signal permits – Implemented 
Management of external works for EAC & SAC –
Implemented 
ASN School Transport - complete – go live
imminent
Professional Design Services – complete – go
live imminent 
101

Page 102

Official
Appendix 2 - East Ayrshire Council Strategic Priorities 2025/26 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details
1 Progress and complete the New
Cumnock Flood Protection
Project 
Complete the flood prevention projects
at the Leggate and beside the Afton
Water.
Phases  1 & 2
Head of Service Complete  East Ayrshire Council and Scottish
Government funding.  The full Scheme was
completed April 2023.  Final defects certificate
issued August 2024
2 Develop Projects approved from
the Flood Risk Management
Plan  
Progress relevant studies and inform
the developing list of schemes for
cycle two of the national protection
schemes to be delivered from 2022. 
Head of Service March 2026  The studies for the River Ayr and the Doon are
now fully complete and options being
appraised.
The Irvine Valley Flood Study is currently
being updated to identify options for a potential
scheme that is more likely to attract funding.
3 Active Travel Strategy Develop active strategy for travel
across South Ayrshire Network and
East Ayrshire Network
Head of Service Ongoing Work is ongoing to finalise the East Ayrshire
Active Travel Strategy and this will be
submitted to Council for approval prior to
Summer recess 2026.
4 EV Strategy  Develop EV strategy across East
Ayrshire Network
Head of Service March 2026  Work on PAN Ayrshire Concession Contract
ongoing with anticipated contract award in
March 2026. 
5 Ash Die back Strategy Develop a risk based strategy for the
management of Ash Die Back.
Head of Service Strategy –
Complete
Surveys -
Ongoing
through
2025/26
Risk based strategy complete.  
Surveys & works ongoing. 28-day notices to
owners with objections received referred to
legal services. 
102

Page 103

Official
Appendix 3 - South Ayrshire Council Strategic Priorities 2025/26 
Action  Success Criteria/
Desired Outcome 
Responsible  Timescale  Details
1 Implementation of car parking
strategy for South Ayrshire. 
Complete this work with improved
parking provision and management. 
Head of Service  Ongoing –
through
2025/26
Updated parking strategy covering Ayr, Troon,
Maybole and smaller settlements to be
presented to Cabinet in March 2026.
2 Develop Projects approved from
the Flood Risk Management
Plan  
Progress relevant studies and inform
the developing list of schemes for
cycle two of the national protection
schemes to be delivered from 2022. 
Head of Service Ongoing
through
2025/26
A Surface Water Management Plan has been
developed for Ayr, Prestwick and Dundonald.
Identified actions are being progressed on a
priority basis and as resources become
available. 
Troon Coastal Flood Study is complete up to
the Options Appraisal stage. 
Pow Burn Prestwick Flood Study is ongoing.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth concerns. 
Contribute to infrastructure projects
which are being developed through the
Regional Transport Appraisal work
being led by Transport Scotland.
Head of Service Ongoing until
2030
Ayrshire Roads Alliance is leading with the
planning and delivery of the AGD Road
Improvement proposals & assisting with the
enabling infrastructure requirements of the
Commercial Build proposition.
4 20mph speed restrictions in
villages
Progress with the 20mph speed
restrictions in all villages.  Maintain
engagement with the local
communities.
Head of Service Ongoing –
through
2025/26 and
future years
Phase 1 & 2 complete.
Phase 3 complete
Phase 4 – Coylton, Maybole & Girvan -
ongoing
Phase 5 – Troon, Prestwick & Ayr to be
progressed in future years.
5 Anticipated Budget Reductions
in 2026/27
Continue to provide a high quality
roads service within decreasing
available budgets.
Head of Service March 2026 Reports to various Committees. 
6 Active Travel Strategy Review South Ayrshire Active Travel
Strategy
Head of Service Ongoing
annually
The Active Travel Strategy will be reviewed
and discussed with the Active Travel
Community Action Group, any amendments
103

Page 104

Official
Action Success Criteria/
Desired Outcome
Responsible Timescale Details
will be presented to the Active Travel Member
Officer Working Group
7 EV Charging Strategy Develop further the  EV strategy for
South Ayrshire Network
Head of Service March 2026 Work on PAN Ayrshire concession contract
ongoing with contract award due in March
2026.
8 Levelling Up Fund Active Travel bid Head of Service Ongoing –
through
2025/26/27
LUF bid successful for construction of new
Active Travel Route between Dundonald and
Barrassie – works ongoing with completion
expected by 31st March 2026. A 2nd bid for
improvements to the NCN7 route from
Prestwick to Barassie station also successful
with work due to start late 2025 and complete
31st March 2027.
9 Motorhome Trials Develop Campervan sites along the
coastline.
Head of Service Complete Permanent schemes now apply at the
Ballantrae, Girvan, Ayr (Esplanade & Battery)
and Troon sites. 
10 Strategic Economic Impact
Assessment A75/A77
There is a growing desire to
understand the importance /
effectiveness of the improvements
outlined along the A75 and A77.
Head of Service Ongoing SEIA complete, ARA tasked to progress STAG
for the A77 or a combined A75/A77 STAG on
behalf of SAC and D&G Council. No funding
forthcoming from D&G, clarification required
from SAC if A77 should be progressed
independently.
11 Ash Dieback Develop a risk based strategy for the
management of Ash Die Back jointly
with South Ayrshire Council.
Head of Service Complete Risk based strategy complete.
Surveys ongoing issuing 28-day notices to
owners with objections received referred to
legal services.
12 152nd Open Championship Delivery of Event Traffic and Transport
Management 
Head of Service Complete Successfully delivered.  Debrief September
2024
13 The International Ayrshow -
Festival Of Flight
Delivery of Event Traffic and Transport
Management
Head of Service Ongoing Successfully delivered.  Debrief November
2025. Planning ongoing for 2026 event.
104