AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
05 September 2025 
Report by the Head of Roads - Ayrshire Roads Alliance   
_____________________________________________________________ 
WINTER SERVICE REVIEW PROGRESS REPORT 
______________________________________________________________ 
Purpose of report 
1. The purpose of this Report is to advise the Joint Committee regarding the
Review of the Winter Service 
Recommendations 
2. It is recommended that the Joint Committee: 
(i) Consider improvements introduced for 2025/26 Winter Season 
(ii) Acknowledge ongoing improvements 
(iii) Consider winter and other emergencies funding levels in relation to
current levels of service. 
Background 
3. The Winter season began with the first treatment for below-zero temperatures,
hoar frost and ice on 11 Nov ’24, marking the start of winter operations, The
coldest temperature in November was recorded on 29th, dropping to -7.5. 
December ’24 was generally mild, though it saw a minimum road surface
temperature (RST) of -5.8.  The first snow flurries were forecast on 18 December,
but overall conditions remained manageable.  Rain was more prevalent than
snow and by Christmas day, RSTs had risen to +8.0, reflecting unseasonably
mild conditions. 
Through January to March ’25, snow was forecast on occasion, but no prolonged
or extreme weather events occurred.  The lowest RST for winter was recorded
during this period, dropping to -9.0, prompting precautionary treatments. 
In summary, Winter 24/25 was relatively mild and manageable.  Despite some
sharp overnight frosts and brief snow forecasts, there were no significant extreme
events and conditions allowed for consistent and effective winter maintenance
responses

Page 2

The combined figures for winter 2024/25 across both East Ayrshire and South
Ayrshire are noted below: 
Year     Salt Used (t)   Treatment Runs
2024/25   13,972    2,755
2023/24   12,514    2,449  
2022/23   12,356    2,295
2021/22   11,689    2,299
2020/21   17,647    3,016 
Main report/main issues 
4. Gritting 
Gritting routes were originally established in 1996 and have only been fully
reviewed once in South Ayrshire since that time.   
SAC existing Priority 1 (P1) gritting routes treat 507.63km (43.12%) of the
overall public road network of 1177.30km.  However, 442.11km (37.55%) of the
public road network is travelled as part of a priority 1 gritting operation. 
EAC existing Priority 1 (P1) gritting routes treat 563.88 km (46.29%) of the
overall public road network of 1,218.11km.  However, 347.40km (28.52%) of
the public road network is travelled as part of a priority 1 gritting operation.   
5. Route Optimisation 
Following the 2024 Route Optimisation exercise undertaken in collaboration
with consultants, Safecote, across South and East Ayrshire Councils, it has
been concluded that no further efficiencies can be achieved within SAC. 
Current route design and coverage already meet the required standards and no
additional reductions are feasible. 
In EAC, analysis of data identified potential efficiencies by reducing the number
of P1 gritting routes from 10 to 8.  While this reduction retains existing network
treatment coverage, it has introduced challenges in completing all routes within
the previously stated 3-hour target.  Dry runs are currently being carried out
with local knowledge amendments applied where required to address these
issues before these route changes can be confirmed. 
A target date of mid-September 2025 has been set for the completion of all
preparatory activities in advance of the winter season commencing on 20th
October 2025.  This includes, 
• Finalisation of optimised route designs 
• Software licensing and system updates
• Staff training and familiarisation sessions

Page 3

• Production of operational support packs for frontline teams. 
These preparatory steps are essential to ensure a smooth transition to the new
routing structure and to support effective service delivery throughout the winter
period. 
6. Storm Eowyn 
In January 2025 Ayrshire was hit by Storm Eowyn. Standby teams were on call
throughout the duration of the storm offering assistance to partners such as
Police Scotland, Scottish Fire and Rescue, and council teams such as Housing. 
In addition to the above, the Director of Housing Operations and Development
was delegated by all three Ayrshire to provide direct liaison with the Scottish
Government and Emergency Services from within Police Scotland Incident
Room at Helen St Glasgow.   
During the severe weather event roads were closed, and fallen tree and other
debris was removed to ensure or communities remained as safe as possible: 
Storm Eowyn reported issues 
Issue reported East Ayrshire  South Ayrshire
Unsafe Building/Structure  7 3
Debris 9 4
Flooding 1 3
Tree down 
Blocked/ Closed Road  118 129
Power line  2 2
Traffic light 2 0 
A dedicated Ayrshire Roads Alliance webpage was created and acted as a
central point of live information updating our communities on road closures,
where our teams were working and how to get in touch. 
During this time the Ayrshire Roads Alliance Facebook and X (formerly Twitter)
channels were fully utilised with staff responding to messages and comments
on each channel ensuring the ever-changing needs of our communities were
met in an efficient and timely manner. 
Updates on Storm Eowyn recorded throughout the event, demonstrated that
social media posts reached 231,313 people a 244% increase on other storm
(Ashley, Bert and Daragh) social media posts. 
Ayrshire Roads Alliance social media 
Metric Reach
Storm Eowyn Reach 231,313
Combined Reach (Storm Ashley, Bert,Darragh) 94,875

Page 4

Analytic data on the Ayrshire Roads Alliance website also highlights significant
engagement levels with the Ayrshire Roads Alliance dedicated Storm Eowyn
webpage, which accounted for 46% of the total website visits in January 2025. 
Ayrshire Roads Alliance website
Metric Visits
Storm Eowyn webpage views 6262
Total ARA website visits January  13494   
7. Winter Service Plan, Gritter Tracking System & Community Grit Bins 
Based on valuable feedback from stakeholders, the Ayrshire Roads Alliance
website and Winter Service Plan continually undergo significant improvements.
These enhancements include the provision of more detailed winter information
and improvements to Gritter Tracking, highlighting all streets on Priority 1
gritting routes as well as grit bin locations and the ability to request a grit bin or
the filling of a grit bin online. The Ayrshire Roads Alliance continue to monitor
and review stakeholder feedback ensuring that our services meet the needs of
the community we serve. 
8. The Ayrshire Roads Alliance teamed up with TrueView Visuals to advance the
digital capabilities of its Gritter Tracking system. This system monitors the
position of gritters and grit bins in real time during the winter period for East and
South Ayrshire Councils. Gritting information is securely stored for 10 hours
and is readily available to users who can easily access the system on various
devices from the Ayrshire Roads Alliance website and obtain detailed
information on out-of-hours winter service vehicle operations. 
9. Social Media statistics continue to improve: 
2023/2024 2024/2025 
Post Type  Number of posts  Reach  Number of posts  Reach 
Winter gritting  43 470,099 33 754,170
Weather warning  44 121,502 26 161,107
Flood event  19 53,152 6 15,149
Storm Ashley      6 40,204
Storm Bert      8 18,445
Storm Darragh      5 36,266
Storm Eowyn      20 231,313    
644,753   1,256,654
Figures taken from October to May

Page 5

10. The treatment of footway routes across ARA network involves collaboration and
assistance from various stakeholders, such as:   
• ARA Roads Maintenance Unit, 
• EAC Greener Communities
• Private Contractors 
These parties assist with salt spreading and brine treatments, while the routes
undergo annual reviews to ensure optimal functionality. 
11. Grit Bins remain on site throughout the entire year and are monitored
throughout for acts of vandalism or misuse. 
12. Details of grit bin and community grit bin locations are published on Gritter
Tracker, accessible from the Ayrshire Roads Alliance website.  Members of the
public can report a problem, or request their nearest grit bin is refilled by
entering a postcode.  Grit bins can be requested online with mandatory fields
highlighted to ensure consistent information is received, resulting in timely
decision-making and response to the recipient.   
13. Since the 2023/24 winter season, a single Winter Controller has overseen
treatment decisions across the entire Ayrshire Roads Alliance (ARA) network,
covering six domains.  This centralized approach has worked well and
continued to do so during winter 2024/25, improving communications and
coordination across all Winter operational depots. 
Wherever possible, treatments were reduced during the period 2200hrs and
0400hrs.  However, when forecasts indicated a requirement, treatments were
carried out during these hours. 
Treating roads during periods of minimal traffic offers limited benefit and incurs
high costs.  For treatments to be most effective, vehicle movements are needed
to assist with salt dispersal and to help break up any accumulation of snow and
ice. 
14. We continue to monitor and report on the total number of Treatment Plan
Actions (TPAs), with a particular focus on those occurring between 2200hrs
and 0400hrs.  Comparisons for the 2024/25 winter season are as follows: 
This data provides ongoing insight into operational efficiency and helps support
decisions around timings of treatments, ensuring both effectiveness and cost
control. 
EAC TPAs TPAs 2200-
0400hrs
% 2200-0400hrs
P1 Routes 82 (74 in 23/24) 13 (15 in 23/234) 15%
Patrol only 12 (12 in 23/24) 3 (5 23/24) 25%

Page 6

SAC TPAs TPAs 2200-
0500hrs
% 2200-0400hrs
P1 Routes 78 (48 in 23/24) 7 (7 in 23/24) 8%
Patrol only 4 (2 in 23/24 0 (1 in 23/24) -
Domains
Routes
40 (24 in 23/24) 8 (8 in 23/24) 20% 
15. ARA recognises the potential cost savings of reducing treatments between
2200hrs and 0400hrs, where weather conditions permit.  One key factor
influencing cost is the rolling impact of overnight treatments, particularly the
requirement to provide compensatory rest periods in line with the Working Time
Directive. 
SAC
• 2023/24 rest period costs - £14,997
• 2024/25 rest period costs - £18,135
• Increase - £3,138 
SAC treats 8 routes internally, outsourcing only 2 routes to external
Contractors.  This heavier reliance on in-house operatives increases the
requirement for rest periods following overnight treatments. 
The rise in rest period costs is also linked to an increase in TPAs, including
Priority 1, patrol and domain routes, which necessitated more overnight
working. 
EAC
• 2023/24 rest period costs - £13,413
• 2024/25 rest period costs - £9,437
• Reduction - £3,976 
EAC treats 5 routes internally, outsourcing 5 routes to external Contractors,
which reduces reliance on internal operatives during overnight periods and
results in lower rest period costs. 
However, this approach carries a significantly higher external Contractor cost,
with a difference of approximately £291,000 compared to SAC. 
This highlights the trade off between internal delivery models and outsourcing –
balancing labour-related costs against Contractor expenditure remains a key
consideration in future service planning. 
16. Salt Usage and Post Winter Review 
Salt orders were placed in September, November, January and March with a
total of 14,500tonnes procured throughout the 2024/25 winter season to ensure
continuous and responsive treatment coverage.

Page 7

Following the end of season, review meetings were held with Winter Controllers 
and Winter Supervisors to reflect on operational performance, identify
challenges and discuss potential improvements.  These discussions will inform
planning and preparation for Winter 2025/26, ensuring the service continues to
evolve and adapt based on lessons learned. 
17. The Winter Service Plan is issued and made available to an agreed distribution
list (2.3.1 in the Plan).  This document will be reviewed and updated annually
prior to winter commencing in October to include revisions/changes to the
service delivery. 
Implications 
19. 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning        X     20, 21 & 22
2. Governance        X       23 & 24
3. Human Resources        X 
4. Equality and Fairer Scotland Duty        X 
5. Financial       X           27
6. Risk       X           28
7. Community Wealth Building       X           29
8. Net Zero       X           30 
Policy/Strategic planning implications 
20. Winter Controller (WC) and Winter Supervisor (WS) current Roles and
Responsibilities are detailed within the Winter Service Plan. This is being
reviewed for the coming winter 2024/25 with roles being established and clearly
defined for responsible officers. 
21. Summer Controller (SC) was introduced in 2018/19 and continued throughout
this Summer to improve communication across the Service.  Duties include: 
•  Risk to communities, SC will contact Senior Management immediately, from
this the SC will then escalate to Chief Executive, Elected Members and
Community Councils
•  SC assesses the Met Office forecast on a daily basis and will email Senior
Management when preparations are required for a forecasted event i.e. high
winds, severe cold weather, hot weather, heavy rain etc.
•  SC have familiarised themselves with organised events across Ayrshire
•  SC have familiarised themselves with the protocol for esplanades (SAC) i.e.
in heavy rain/wind events, car parks are closed off to ensure safety of road
users.

Page 8

22. Winter Resilience – Community Self-Help Gritting Groups 
Since 2018/19, the number of winter resilience groups across the ARA area
has grown significantly – from 44 groups to 129.  These volunteer groups play a
vital role in supporting self-help footway gritting, enhancing community
resilience during winter weather. 
ARA continues to support these groups by providing training, materials,
equipment and PPE.  Engagement with additional communities is ongoing and
we aim to further expand our participation for Winter 2025/26, strengthening
local capacity and ensuring greater coverage across our network. 
Governance Implications
23. The work of the Ayrshire Roads Alliance is undertaken in accordance with
relevant legislation. 
24. By virtue of the relevant statutory provisions, principally detailed within the 
Roads (Scotland) Act 1984, the Council as local roads authority is required to
manage and maintain all publicly adopted roads within its area other than those
which are maintained and managed by the Scottish Ministers. 
Human resources implications 
25. The Winter Service Review has no direct impact on human resources. 
Equality Impact and Fairer Scotland duty implications 
26. The Winter Service Review has no direct impact on Equality. 
Financial Implications 
Winter Service Outturn Summary 2024/25 vs 2023/24 
2023/24 
Labour Materials Hired
Plant
Fleet/
Plant
Contractors TOTAL
OUTTURN
SAC £118,279 £270,654 £150,156 £3,238 £42,424 £584,751
EAC £127,240 £376,751 £113,451 £3,554 £127,270 £748,266

Page 9

2024/25 
Labour Materials Hired
Plant
Fleet/
Plant
Contractors TOTAL
OUTTURN
SAC £222,080 £289,856 £176,742 £4,706 £31,390 £724,773
EAC £182,774 £436,043 £125,858 £4,166 £322,399 £1,067,984
(incl.
income
£3,255) 
SAC
• 2024/25 Total Outturn: £724,773
• 2023/24 Total Outturn: £584,751
• Increase: £140,022 
The main contributor to the increase is labour costs, which rose by £103,801, due
to factors such as increased staff hours and overtime requirements during prolonged
treatment periods, evident in the increased TPAs above. 
There was a decrease in spend on external contractors by £11,934 reflecting a
greater use of internal resources and reduced need for support services. 
EAC
• 2024/25 Total Outturn: £1,067,984
• 2023/24 Total Outturn: £748,266
• Increase: £319,718 
The most significant rise was in external contractors costs, up by £195,129, due
to increased outsourcing to support treatment delivery during peak events.  Material
costs also increased by £59,292 which is attributed to higher salt usage due to
weather conditions and increased TPAs. 
Risk Implications 
27. Funding for winter service delivery remains an area of concern.  The allocated
budgets for 2024/25 were £600,000 (SAC) and £633,190 (EAC). 
Although Winter 24/25 was relatively mild and manageable, with some
overnight frosts but no significant extreme weather events, both areas
experienced outturns well above their allocated budgets.  This highlights the
financial pressures of delivering the service even under moderate conditions. 
Given this context, any future winter requiring above-average treatment
frequencies or response to severe weather would present a significant financial
challenge.  This underscores the importance of ongoing efficiency measures
and robust contingency planning.

Page 10

Community Wealth Building implications 
28. The winter service contributes to the principles of Community Wealth Building 
by supporting resilient and inclusive local economies.  It encourages local
spending, promotes fair employment practices, and helps ensure that economic
benefits are retained within the community, contributing to greater ownership
and improved outcomes for local people. 
Net zero implications 
29. The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire 
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
Appendices (if applicable)
None 
Background papers
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer(s) 
Craig Knape – Strategic Manager – Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: craig.knape@ayrshireroadsalliance.org 
Janice Kelly, Team Leader & Winter Lead - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: janice.kelly5@ayrshireroadsalliance.org