AYRSHIRE SHARED SERVICES JOINT COMMITTEE 5 SEPTEMBER 2025 
INTERNAL AUDIT ANNUAL UPDATE REPORT: 
AYRSHIRE ROADS ALLIANCE 
Report by Chief Auditor, East Ayrshire Council 
SUBJECT: INTERNAL AUDIT ANNUAL UPDATE REPORT 
PURPOSE OF REPORT 
1. This established annual report is intended to provide, for noting, an update on
internal audit work for the Ayrshire Roads Alliance (ARA). 
RECOMMENDATIONS 
2. It is recommended that Joint Committee: 
i. notes the outcomes of a wide range of Internal Audit work for ARA
carried out by East Ayrshire Council since inception as summarised at
paragraphs 11-12 and detailed at Appendices 1 and 2; 
ii.  notes the Chief Auditor’s ongoing annual opinion for 2024/25 of
reasonable assurance for EAC arrangements as laid out at paragraph
13; 
iii. notes the ARA items included in the 2025/26 EAC Internal Audit plan as
referred to at paragraph 14 and listed in Appendices 1 and 2; and
iv. otherwise notes the contents of this report. 
BACKGROUND 
FRAMEWORK FOR INTERNAL AUDIT WORK
3. As the lead authority EAC provides the internal audit service to ARA. South
Ayrshire Council (SAC) is able to carry out Following the Public Pound (FtPP)
type audits as desired and those reports would be a matter for SAC to
consider. The Chief Auditors of both Councils work closely together including
through the longstanding Pan-Ayrshire Chief Auditors Group. 
4. ARA assignments are included in the annual EAC Internal Audit Plan
approved by EAC’s Governance and Scrutiny Committee in line with current
professional standards which, until 31 March 2025 were those set out in the
Public Sector Internal Audit Standards (PSIAS) and from 1 April 2025 are
those set out in the Global Internal Audit Standards (GIAS) in the UK Public
Sector.
5. Professional standards require the Chief Auditor to establish a follow-up
process to monitor and ensure management actions have been effectively
implemented. We follow-up by testing evidence to gauge implementation of
recommendations (Appendix 2).

Page 2

2
6. Individual internal audit assignment reports and follow-up exercises are
shared with both EAC and SAC as well as External Audit: 
• EAC - the established readership includes senior management and all
Elected Members through the Councillors’ Noticeboard. 
• SAC – all reports are copied to the Director of Housing, Operations and
Development and shared with the SAC Chief Internal Auditor for
onward reporting in line with SAC arrangements. 
7. The Head of Roads continues to accept and welcome Internal Audit
recommendations. 
TRUST IN INTERNAL AUDIT - EXTERNAL AUDIT
8. External Audit report their annual conclusions on internal audit within their
annual audit report to the Council. The most recent report is for 2023/24 with
no significant issues arising providing assurance for those placing confidence
in the work of Internal Audit. Our arrangements have remained stable since
2023/24. 
TRUST IN INTERNAL AUDIT - EXTERNAL QUALITY ASSESSMENT (EQA)
9. The PSIAS required a Quality Assurance and Improvement Programme
(QAIP) to be in place including an independent EQA to be carried out every
five years. EAC’s Governance and Scrutiny Committee considered the very
positive outcomes from the most recent EQA exercise, carried out by the
Chartered Institute of Public Finance & Accountancy (CIPFA), on 20 April 2023
as reported to the ASSJC on 1 September 2023. Our arrangements have
remained stable since that EQA, with an equivalent exercise required in due
course under the GIAS.
MAIN REPORT 
ASSURANCE OUTCOMES FOR INDIVIDUAL ASSIGNMENT REPORTS 
10. Assignment reports, with the exception of some advisory work and fact-
finding, conclude with an overall assessment of the controls under review
using the list below as a guide. We also consider context including risk and
materiality. 
sound assurance / sound assurance in most areas – objectives of
internal control have been met in all/almost all areas within the scope of the
audit; non-compliance has only been identified in low risk or medium risk
areas. 
reasonable assurance - objectives of internal control have been met in the
majority of areas; some weaknesses have been identified in medium risk
areas; this tends to be the most common assurance outcome. 
limited assurance – the control objectives have not been fully achieved;
control weaknesses have been identified in some high risk areas.               
no assurance – the control objectives have not been met; significant non-
compliance and/or control weaknesses have been identified.

Page 3

3
INTERNAL AUDIT WORK – AN OVERVIEW   
11. Appendix 1 lists internal audit work since 2013/14 at which point the EAC
Chief Auditor was a member of the working group to establish ARA.  An
overview of all outcomes is listed in the table below. 
Assurance Outcome  Number of outcomes 
sound assurance / sound
assurance in most areas
5
reasonable assurance 7
limited assurance 4
no assurance  0
advisory  5
Total outcomes  21 
12. Appendix 2 lists 10 completed follow-up exercises since 2016/17 to test
implementation of internal audit recommendations made since the inception of
ARA. Follow-up exercises show improved performance since 2018/19 with all
exercises carried out since that year resulting in scores of 100% which means
that all recommendations tested were either fully or sufficiently implemented
demonstrating ongoing management commitment to continuous improvement. 
ANNUAL INTERNAL AUDIT OPINION: EAC 2024/25
13. ARA operates within the control systems of EAC, therefore the Chief Auditor’s
annual opinion for EAC is of interest to the ASSJC. The most that Internal
Audit can provide in an annual opinion for the Council is reasonable assurance
based on the risk based plan and a rolling programme of work. This is similar
to the scope of external audit work in the context of the Council’s financial
statements which aims to give reasonable assurance on the statements. The
Annual Internal Audit Opinion for East Ayrshire Council in 2024/25 stated that,
“reasonable assurance can continue to be placed upon the adequacy and
effectiveness of the Council’s framework of governance, risk management and
control in the year to 31 March 2025”. The opinion was considered by EAC’s
Governance and Scrutiny Committee on 24 April 2025.
PLANNED AUDIT ASSIGNMENTS FOR ARA – 2025/26 
14. In line with professional standards a full risk based plan was agreed by EAC’s
Governance and Scrutiny Committee on 5 June 2025. SAC were consulted
during the planning process. It should be noted, that in line with good practice
the plan can be changed in year to accommodate emerging priorities. The
planned ARA work for 2025/26 is included in Appendices 1 and 2.

Page 4

4 
15. The EAC Depute Chief Executive (Communities and Economy), the Head of
Roads and the EAC Chief Auditor will agree the scheduling and detailed
content of assignments in line with established arrangements.   
IMPLICATIONS 
16. Eight implications have been considered in the preparation of this report.   
Implications Yes No Paragraph
number in report
1. Policy/Strategic Planning  No 
2.Governance  No 
3. Human Resources  No 
4. Equality and Fairer Scotland Duty  No 
5. Financial   No 
6. Risk  Yes  Para 17
7. Community Wealth Building   No 
8. Net Zero   No 
RISK IMPLICATIONS 
17. Each year there is the ongoing risk of significant unplanned work emerging,
planned resources not being available and work not being carried out to an
acceptable standard which would compromise the ability to complete sufficient
work. The likelihood is low to medium risk but the impact would be high risk.
The EAC Audit Manager and Chief Auditor oversee operations with the
objective of mitigating this risk. 
APPENDICES 
18. Two appendices support this report: 
• Appendix 1: Internal Audit Assignments: 2013/14 to 2025/26  
• Appendix 2: Internal Audit Follow-Up Exercises 2016/17 to 2025/26 
BACKGROUND PAPERS  
1. Public Sector Internal Audit Standards (PSIAS) (3rd edition March 2017) 
2. Chartered Institute of Public Finance and Accountancy (CIPFA) Local
Government Application Note for the United Kingdom Public Sector Internal
Audit Standards (2nd edition February 2019) 
3. Chartered Institute of Public Finance and Accountancy (CIPFA), Statement on
the Role of the Head of Internal Audit in Public Service Organisations (2nd
edition April 2019) 
4. Institute of Internal Auditors (IIA) Global Internal Audit Standards (GIAS)
(January 2024)

Page 5

5
5. EAC Governance & Scrutiny Committee, 26 September 2024, Annual External
Audit Report 
6. Global Internal Audit Standards in the UK Public Sector: Application Note
(IASAB, December 2024) 
7. Code of Practice for the Governance of Internal Audit in UK Local Government
(CIPFA, February 2025) 
8. EAC Governance & Scrutiny Committee, 24 April 2025, Internal Audit 2024/25
Annual Report and Annual Internal Audit Opinion 
9. EAC Governance & Scrutiny Committee, 5 June 2025, Internal Audit Plan
2025/26 
Eilidh Mackay 
Chief Auditor, East Ayrshire Council 
25 August 2025 
Person to Contact: 
Eilidh Mackay, Chief Auditor eilidh.mackay@east-ayrshire.gov.uk 
Implementation Officer: 
Paul Davies, Audit Manager paul.davies@east-ayrshire.gov.uk

Page 6

6
Appendix 1
INTERNAL AUDIT ASSIGNMENTS: 2013/14 TO 2025/26
Year  Name Summary Assurance Outcomes 
2013/14  Support to working 
group to establish ARA 
Advisory to support governance, risk management and internal 
control arrangements. 
Advisory   
1 April 2014 – ARA goes live 
2014/15  Plant Hire Contract 
(coverage included ARA 
and other services)
Objectives were to: 
• ensure that hires are awarded to the correct service provider
in accordance with the framework agreement;
•   ensure that processes for managing plant on and off hire are
rigidly controlled and properly recorded; and
• ensure that the correct contractual prices are paid for plant
hires provided in accordance with the framework terms and
conditions.
Reasonable 
2014/15  Inventory 
Inspections 
(unannounced visits) 
Objectives of the assignment were to:
• verify the accuracy of inventory levels recorded within the
store
• report any areas for improvement identified, and
• recommend actions to address areas for improvement.
Reasonable 
2014/15  PROFESS Costing 
System
The objectives of the assignment were to:
• consider the overall costing and financial reporting
arrangements put in place for the Ayrshire Roads Alliance;
• assess the status of implementation and roll-out of the
PROFESS costing system, including the integration of inputs
from the former East and South Ayrshire roads services;
• consider whether the information needs of management and
stakeholders are being met by the current arrangements;
Reasonable

Page 7

7
• report any areas for improvement identified, and recommend
actions to address areas for improvement
2015/16  TRIPS System Advisory Advisory to support governance, risk and internal control 
arrangements regarding the development of the established 
Transparent Roads Infrastructure Procurement Software (TRIPS) 
system used to manage the Roads Minor Works Framework Contract 
to support best value. 
Advisory 
2016/17  Parking Income and 
Penalty Charge Notices 
(PCNs)
The objectives of the assignment were to:
• review the systems for Parking-related income
• report any areas for improvement identified, and 
• recommend actions for improvement.
Reasonable 
2017/18 Performance Bonds  The objectives of this audit assignment were to verify:
• policy and procedures accord with Scottish Government
strategy and national guidance on best practice;
• corporate governance and reporting arrangements are fit for
purpose and effectively applied;
• practical processes and supervisory controls are in place in
ARA for implementing approved policy;
• ARA’ s bond management is supported by effective
partnership arrangements with third parties (for example with
South Ayrshire Council and with EAC’s Planning and
Economic Development, Finance and ICT and Legal);
• bond values reflect application of the above and give
sufficient budget to fund any necessary remedial work.
Limited 
2017/18 Use of Contractors  The objectives of this audit assignment were to:
•  establish the process for awarding roads works contracts
procured through the Transparent Roads Infrastructure
Procurement Software (TRIPS) 
•  ensure roads works are being awarded appropriately in line
with Standing Orders Relating to Contracts and assess
whether Best Value is being achieved.
Reasonable

Page 8

8
•  ensure adequate controls are in place with regards to
processes for awarding works, payment of invoices and
monitoring of contractor performance.
2018/19  Girvan Harbour – office 
administration 
(unannounced visit)
The objectives of this audit assignment were to: 
• understand the operation of Girvan Harbour and ensure that
there are adequate arrangements in place to control income
collected in respect of harbour operations
• to identify areas for potential future audits.  
Limited 
2018/19 Payment Controls  The aims and objectives of this audit assignment were to: 
• review the procedures in place for payment of contractors 
• verify that there are adequate controls in place to verify the
work completed prior to approving invoices for payment.  
Sound 
2018/19 Bridge Inspections  The EAC Depute Chief Executive (Safer Communities) with 
assistance from Internal Audit reviewed ARA-East’s arrangements for 
bridge inspection and reporting.  Following this work, in 2019/20 
Internal Audit undertook a full examination of arrangements for the 
Principal Inspections of road bridges. 
Advisory 
2019/20  Arrangements for the
Principal Inspection (PI)
of road bridges
The objective of this audit assignment was to:
• update the findings of 2018/19 advisory work to reflect the
undertaking and completion of the outsourced Principal
Inspection programme and work done by ARA further to the
Client Response agreed actions set out in the draft audit
report and accompanying advisory note of 2018/19. 
Two outcomes: 
Sound in South and 
Reasonable in East         
2019/20 Road Bonds review of 
new processes 
The objectives of this audit assignment were to:
• verify procedures in relation to roads bonds are adequate,
have been updated to reflect the findings of previous audit
work and have been fully implemented within the service, and
• the audit will also seek to confirm that ARA’s internal review
of the process, and scrutiny by external assessor (SGS Ltd),
have verified control effectiveness; and that if necessary,
procedures have been further revised to improve controls.
Sound in most 
areas

Page 9

9
2020/21 Roads Maintenance:
materials and stores 
The objective of this audit assignment was to:
• obtain assurance that the service has adequate
arrangements in place to ensure proper control over the
receiving, storing and issuing of materials and stores, and
that these processes are operating efficiently and effectively.
Reasonable 
2021/22 Whistleblowing 
allegations – fact-finding 
Final report issued in 2021/22 to both Councils; interim outputs 
issued prior to that to support decision-makers following referral in 
summer 2019. 
Advisory
2022/23 Payment Controls 
(including measurement 
of works) 
The objective of this audit was to verify that payments made to
contractors accurately reflect the quality and quantity of works carried
out.  If controls are absent or ineffective, then works may be
incomplete, sub-standard or over-charged; 
• our audit involved reviewing ARA’s procedures for approving 
contractors’ invoices / certificates for payment, and confirming           
there are effective controls in place and operating to confirm 
the payments made for goods and services are appropriate; 
• we backed this up with a sample check of fifteen transactions,
to confirm that approved procedures are being followed and
controls applied to ensure the accuracy of payments and verify
the evidencing of appropriate checks by the service;
• our audit focussed on three high spend areas - bridge
strengthening, road resurfacing and traffic management.
Three outcomes:
Limited (2) and
sound assurance.   
Our audit confirmed
that ARA has
appropriate procedures
in place incorporating
robust controls, which
when applied in
practice, should ensure
sound control of
expenditure, and
accurate payments to
contractors.   
We noted an
operational impact due
to staff absence.    
ARA has responded
positively to our
findings.

Page 10

10
2023/24 Flood Risk Management  The aims and objectives of this assignment were to support ARA 
self-assessment with regard to:
•  governance arrangements for statutory flood risk
management duties, with a view to ensuring these are fit for
the purpose of supporting strategic oversight, decision-
making and accountability;
•  ARA’s contributions to the Local Flood Management Plans
covering constituent council areas, with a view to ensuring
Plans are consistent with East and South Ayrshire’s exposure
to (and risk appetite for) flood risks;
•  Statutory obligations with regard to a watercourse inspection
and clearance regime.
Advisory. 
Service engaged with
process; self-
assessment checklist
developed with
assurance session
being progressed with
Depute Chief
Executive and Head of
Roads. 
2024/25  Contract Controls  The aims and objectives of this audit were to:
• Verify payments made to major contractors accurately reflect
the quality and quantity of works carried out;
• Confirm service arrangements support achievement of best
value and secure effective internal control.
Report being finalised
with seven
recommendations
which will further
enhance the control
environment.  Scope
expanded following
request from EAC DCE
(Communities &
Economy).
2024/25 Stores  The aims and objectives of this audit assignment were to:
• Review processes for managing inventory within the 
Ayrshire Roads Alliance (ARA) stores.
• Confirm that the security arrangements for ARA inventory 
are adequate.
• Determine the arrangements for replenishing inventory 
when required and confirm adequate controls are in place. 
• Ensure inventory movements are recorded accurately 
Sound in most 
areas

Page 11

11      
and reviewed; and confirm inventory on site can be 
matched to records.
2025/26 Digital Transformation
of Workstreams The aims and objectives of this audit assignment are to:
• Verify effective internal controls have been incorporated within
processes subject to digital transformation. 
Work underway.

Page 12

12 
Appendix 2
INTERNAL AUDIT FOLLOW-UP EXERCISES: 2016/17 TO 2025/26
Year  Name Summary Score   
1 April 2014 – ARA goes live 
2016/17  PROFESS Costing 
System – Follow-up
To test implementation of all ten 
recommendations made in 2014/15. 
Score 67%. Six recommendations tested 
with four fully or sufficiently implemented 
and two not implemented.
The four other recommendations were
dependent on the completion of the
definitive build of PROFESS and could
not be tested at the time of the follow-up;
the Head of Service signed a Client
Assurance Statement at that time
agreeing actions required. 
2016/17  Plant Hire – Follow-up To test implementation of all four 
recommendations made in 2014/15.
Score 75%. Three recommendations 
fully implemented and one partially 
implemented. 
2016/17  Inventory 
Inspections – Follow-up
To test implementation of all five 
recommendations made in 2014/15.
Score 60%. Three recommendations  
fully or sufficiently implemented; one
partially and one not implemented.
2017/18 Parking Income and 
PCNs – Follow-up
To test implementation of all 13 
recommendations made in 2016/17.
Score 92%. Twelve recommendations 
fully or sufficiently implemented and one 
partially implemented. 
2018/19 Performance Bonds – 
Follow-up
To test implementation of all two 
recommendations made in 2017/18.
Score 100%. Both recommendations
sufficiently implemented. 
2018/19 Use of Contractors – 
Follow-up
To test implementation of all two 
recommendations made in 2017/18.
Score 100%. Both recommendations fully 
implemented.

Page 13

13
2019/20 ARA Girvan Harbour -
Follow-up 
To test implementation of all five 
recommendations made in 2018/19.
Score 100%. 
All recommendations either fully or 
sufficiently implemented.
2019/20  Arrangements for the 
Principal Inspection (PI) 
of road bridges – 
Follow-up
To test implementation of all five 
recommendations made earlier in 2019/20.
Score 100%. All recommendations either 
fully or sufficiently implemented.
2021/22  Roads 
Maintenance: materials 
and stores - Follow-up 
To test implementation of all five 
recommendations made in 2020/21.
Score 100%. All recommendations fully 
implemented.
2021/22 Road Bonds review of 
new processes – 
Follow-Up 
To test implementation of all six 
recommendations made in 2019/20.
Score 100%. All recommendations either 
fully or sufficiently implemented.
2024/25  Payment Controls 
(including measurement 
of works) – Follow-Up 
Follow up testing of implementation of all three
recommendations made during the 2022/23
assignment.  
Rescheduled into 2025/26 – working with
service to align with new digitised
processes.
2024/25  Flood Risk Management 
– Follow-Up
Advisory support as required for the self-
assessment process previously created with
formal follow-up of the recommendation raised. 
Rescheduled into 2025/26 due to
recruitment of new flooding officer.  Work
anticipated to commence in late summer
2025.
2025/26 Contract Controls –
Follow-Up
To test implementation of the proposed seven
recommendations in the current draft report. 
Work will be scheduled pending
agreement of implementation schedules. 
END