Agenda Document Pack - Ayrshire Shared Services Committee - 06/06/2025

North Ayrshire Council · 6 June 2025
Back to Ayrshire Shared Services Committee — 6 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Ayrshire Shared Services Committee
A Meeting of the Ayrshire Shared Services Committee of North Ayrshire Council will
be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Friday, 06 June 2025 at 10:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the Minutes of the Meeting of the Ayrshire Shared
Services Committee held on (i) 6 December 2024 and (ii) 7 March 2025
will be confirmed and the Minutes signed in accordance with Paragraph 7
(1) of Schedule 7 of the Local Government (Scotland) Act 1973 (copy
enclosed).
3 Ayrshire Civil Contingencies
Submit report by the Chief Governance Officer on the progress made
against the current Ayrshire Civil Contingencies Team (ACCT) Service
Plan for 2025/2026 (copy enclosed).
4 Ayrshire Roads Alliance Service Plan
Submit report by the Head of Ayrshire Roads Alliance on the Ayrshire
Roads Alliance Service Plan for 2025/26 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
5 Performance Scorecard
Submit report by the Head of Ayrshire Roads Alliance on the progress
made to date against the Performance Scorecard (copy enclosed).
6 Risk Register
Submit report by the Head of Ayrshire Roads Alliance on the management
of risk associated with the Ayrshire Roads Alliance (copy enclosed).
7 Roadworks Programme 2025/2026
Submit report by the Head of Ayrshire Roads Alliance on the progress of
work through the roads improvement programmes within East Ayrshire
and South Ayrshire for financial year 2025 to 2026 (copy enclosed).
8 Development Control Update - Roads Bonds
Submit report by the Head of Ayrshire Roads Alliance on the current
position regarding road bonds held by the Ayrshire Roads Alliance on
behalf of East Ayrshire and South Ayrshire Councils (copy enclosed).
9 Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Ayrshire Shared Services Committee Sederunt
North Ayrshire Council
Marie Burns
Joe Cullinane
Scott Davidson
Cameron Inglis
East Ayrshire Council
Barry Douglas
Jim McMahon
Douglas Reid
Neill Watts
South Ayrshire Council
Alec Clark
Craig Mackay
Bob Pollock
Philip Saxton
Chair:
Apologies:
Attending:
4

Page 5

1 
AYRSHIRE SHARED SERVICES JOINT COMMITTEE 
Minutes of Hybrid Meeting held on 6 December 2024 at 10.00 a.m. 
Present 
in County 
Buildings: Councillors Alec Clark and Philip Saxton (South Ayrshire Council). 
Present 
Remotely: Councillors Clare Maitland and Neill Watts (East Ayrshire Council) and
Councillors Marie Burns and Cameron Inglis (North Ayrshire Council). 
Apologies: Councillors Bob Pollock and Craig Mackay (South Ayrshire Council),
Councillors Barry Douglas, Jim McMahon and Douglas Reid (East Ayrshire
Council), Councillors Joe Cullinane and Scott Davidson (North Ayrshire
Council). 
Attending 
in County 
Buildings: L. Jeffery, Civil Contingencies Co-Ordinator (South Ayrshire Council); J.
Corrie, Head of Roads - Ayrshire Roads Alliance; T. Mackin, Strategic
Manager – Ayrshire Roads Alliance; and K. Hancox, Committee Services
Officer (South Ayrshire Council). 
Attending 
Remotely: J. McLachlan, Chief Financial Officer and Head of Finance and ICT (East
Ayrshire Council). 
It was advised that in the absence of Councillor Bob Pollock, Councillor Alec Clark
would chair this meeting. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of the Joint Committee’s
Order No. 25 and the Councillors’ Code of Conduct. 
2. Proposed Schedule of Meeting Dates for 2025 
The Proposed Schedule of Meetings Dates for 2025 (issued) was submitted and
approved. 
3. Minutes of Previous Meetings 
The Minutes of 7 June 2024 and 24 September 2024 (issued) were submitted and
approved. 
Agenda Item 2
5

Page 6

2 
4. Ayrshire Civil Contingencies Team 
There was submitted a report (issued) of 27 November 2024 by the Chief Governance
Officer advising the Joint Committee on the progress made against the current Ayrshire
Civil Contingencies Team (ACCT) Service Plan for 2024/2025 (Appendix 1) and to
provide a revised Service Plan for 2025/26 (Appendix 2). 
Following a question from a Member regarding his concern surrounding planning for a
Power Resilience Emergency, the Civil Contingencies Co-ordinator advised that work
had been ongoing for each of the three local authorities. 
The Joint Committee 
Decided: to approve the progress made against the work plan for 2024/2025 and to
accept the new Service Plan for the following years. Highlights were
summarised in the following paragraphs and outlined in greater detail at
Appendix 1. 
Councillors Marie Burns and Cameron Inglis left the meeting at this point. 
5. Ayrshire Roads Alliance – Revenue Financial Monitoring Report 
There was submitted a report (issued) of December 2024 by the Chief Financial Officer
and Head of Finance & ICT updating the Joint Committee on the revenue budget
monitoring position as at 30 September 2024, for the Ayrshire Roads Alliance. 
The Joint Committee 
Decided: 
(1) to note the financial management position of the Ayrshire Roads Alliance for
2024-25; 
(2) to request a further financial update at the next meeting of the Joint Committee;
and 
(3) to otherwise note the contents of the report. 
6. Ayrshire Roads Alliance – Performance Scorecard 
There was submitted a report (issued) of December 2024 by the Head of Roads -
Ayrshire Roads Alliance advising on the progress made to date against the Performance
Scorecard. 
The Strategic Manager – Ayrshire Roads Alliance (ARA) advised the Joint Committee
that Ayrshire Roads Alliance had received awards in two categories at the Association
for Public Service Excellence (APSE), namely Street Lighting – East Ayrshire Council:
Most Improved Performer and Roads, Highways and Winter Maintenance – South
Ayrshire Council: Best Performer. 
A Member of the Committee requested information regarding the number of General
Bridge Inspections and why the target had not been met for East Ayrshire, the Strategic
6

Page 7

3 
Manager – ARA advised that there had been a long-term absence by the Clerk of Works
which had impacted this, however the role had since been filled and work was ongoing
to rectify the backlog. 
Having heard a Member enquire about the staff quota at Ayrshire Roads Alliance, the
Strategic Manager – ARA confirmed that there had been vacancies open which were
advertised including Modern Apprenticeships which had received a high volume of
applicants; and that it had been hoped all vacancies would soon be filled. 
The Joint Committee 
Decided: 
(1) to note the performance scorecard presented in the report; 
(2) to continue to receive the performance scorecard updates; and 
(3) to otherwise note the contents of the report. 
7. Ayrshire Roads Alliance – Risk Report and Register 
There was submitted a report (issued) of December 2024 by the Head of Roads -
Ayrshire Roads Alliance advising on the management of risk associated with the
Ayrshire Roads Alliance. 
Following discussion regarding the cost of materials for resurfacing roads, the Head of
Roads – ARA advised that the roads affected by the delayed resurfacing work would
be regularly inspected to ensure no serious safety defects occurred. It was further
noted that the cost of materials had been monitored to identify if there had been any
changes. 
A Member of the Panel stated it would be beneficial for the Ayrshire Roads Alliance
telephone number for reporting faults to be better advertised, the Head of Roads –
ARA advised that they would consider the use of signs and social media to inform the
public. 
The Joint Committee 
Decided: 
(1) to note the risk register presented in the report; 
(2) to continue to receive updates on progress; and 
(3) to otherwise note the contents of the report. 
8. Ayrshire Roads Alliance – Roadworks Programme 2024/25 
There was submitted a report (issued) of December 2024 by the Head of Ayrshire
Roads Alliance advising on the progress of work through the roads improvement
programmes within East Ayrshire and South Ayrshire for financial year 2024 to 2025. 
Comments and questions from Members included:
7

Page 8

4 
(1) highlighting concerns in relation to the Girvan Harbour dredging and the impact of
this on the Royal National Lifeboat Institution; 
(2) an update on Pavement Parking and how this would be monitored, the Head of
Roads – ARA advised that assessments were complete for East Ayrshire and were
nearing completion for South Ayrshire; and that how to monitor pavement parking
was under review; 
(3) clarification on Active Travel Funding and the timescale to spend funds received,
the Head of Roads – ARA advised that the funding had to be requested in January
and if successful, it would be received by March and required to be spent by March
the following year; and 
(4) that it had been good to see 97% of scheduled work completed and thanks were
given to ARA team. 
The Joint Committee 
Decided: 
(1) to note the Ayrshire Roads Alliance programmed works 2024/25; and 
(2) to otherwise note the contents of the report. 
9. Ayrshire Roads Alliance – Roadworks Programme 2024/25 
There was submitted a report (issued) of December 2024 by the Head of Roads -
Ayrshire Roads Alliance advising on the management of the Improvement Action Plan
by the Ayrshire Roads Alliance. 
A Member of the Committee requested information in relation to the Girvan Flood
Scheme which had not proceeded due to no available funding, the Head of Roads –
ARA advised that this would be investigated and reported back. 
Having heard a Member of the Committee seek information on the timescale for a
report to be provided regarding the Prestwick Flood Study, the Head of Roads – ARA
advised that this would also be investigated and reported back. 
The Joint Committee 
Decided: 
(1) to note the Improvement Action Plan presented in the report; 
(2) to note the Improvement Action Plan presented in the for Fleet Management East
Ayrshire Only; 
(3) to continue to receive updates on progress; and 
(4) to otherwise note the content of the report. 
The meeting ended at 10.40 a.m. 
8

Page 9

1 
AYRSHIRE SHARED SERVICES JOINT COMMITTEE 
Minutes of Hybrid Meeting held on 7 March 2025 at 10.00 a.m. 
Present 
in County 
Buildings: Councillors Bob Pollock (Chair) and Alec Clark (South Ayrshire Council),
and Councillor Jim McMahon (East Ayrshire Council). 
Present 
Remotely: Councillor Philip Saxton (South Ayrshire Council), Councillors
Barry Douglas; Douglas Reid; and Neill Watts (East Ayrshire Council). 
Apology: Councillor Craig Mackay (South Ayrshire Council). 
Attending 
in County 
Buildings: K. Braidwood, Director of Housing, Operations and Development (South
Ayrshire Council); J. Corrie, Head of Roads; and C. Knape, Strategic
Manager (Ayrshire Roads Alliance); and A. Gibson, Committee Services
Officer (South Ayrshire Council). 
Attending 
Remotely: P. Whip, Group Finance Manager (East Ayrshire Council). 
1. Declarations of Interest. 
There were no declarations of interest by Members in terms of the Joint Committee’s
Order No. 25 and the Councillors’ Code of Conduct. 
2. Revenue Financial Monitoring Report 2024/25. 
There was submitted a report (issued) of February 2025 by the Chief Financial Officer
and Head of Finance and ICT providing an update on the revenue budget monitoring
position as at 31 December 2024, for the Ayrshire Roads Alliance. 
Having heard a Member of the Committee make an enquiry in relation to the position
regarding vacancies and the need to retain staff within the Ayrshire Roads Alliance
and having heard various officers in response, it was noted that there was now a
training officer in post. 
Following an enquiry from a Member, it was agreed that the Head of Roads, Ayrshire
Roads Alliance would provide Members of the Joint Committee with figures relating to
the income received for parking charges for both East Ayrshire and South Ayrshire. 
Agenda Item 2
9

Page 10

2 
The Joint Committee 
Decided: 
(1) to note the financial management position of the Ayrshire Roads Alliance for
2024-25; 
(2) to note the interventions that were being taken to address the adverse financial
position; 
(3) to request that a further financial update be provided at the next meeting of the
Joint Committee; and 
(4) to otherwise note the contents of this report. 
3. Roadworks Programme 2024/25. 
There was submitted a report (issued) of February 2025 by the Head of Roads -
Ayrshire Roads Alliance advising on the progress of work through the roads
improvement programmes within East Ayrshire and South Ayrshire for financial year
2024 to 2025. 
Following discussion regarding electric charging points provided in East Ayrshire;
various ward issues; the Ayrshire Roads Alliance recent APSE awards; the effects of
the recent storm in January of this year and issues relating to ash dieback, the Joint
Committee 
Decided: 
(1) to note the Ayrshire Roads Alliance programmed works 2024/25; and 
(2) to otherwise note the contents of the report.   
4. Improvement Action Plan. 
There was submitted a report (issued) of February 2025 by the Head of Roads -
Ayrshire Roads Alliance advising on the management of the Improvement Action Plan
by the Ayrshire Roads Alliance. 
Following discussion regarding Active Travel Funding, the Joint Committee 
Decided: 
(1) to note the Improvement Action Plan, as presented in this report; 
(2) to note the Improvement Action Plan, as presented in this report for Fleet
Management (East Ayrshire only); 
(3) to agree to continue to receive updates on progress; and 
(4) to otherwise note the content of the report. 
10

Page 11

3 
5. Performance Scorecard. 
There was submitted a report (issued) of February 2025 by the Head of Roads -
Ayrshire Roads Alliance regarding the progress made to date against the Performance
Scorecard. 
Having heard the Head of Roads, Ayrshire Roads Alliance advise of amendments to
the figures for East Ayrshire Council for 2022/24 and following a question from a
Member, it was agreed that she would provide the Members of the Panel with details
on the success of the portal provided for the public to report potholes. 
Having heard a Member of Joint Committee, it was agreed the Head of Roads,
Ayrshire Roads Alliance would revisit the average set by themselves for the number of
Priority 1 Repair Lines issued for East Ayrshire Council, as APSE’s average was
91.20%. 
The Joint Committee 
Decided: 
(1) to note the performance scorecard presented in the report; 
(2) to continue to receive the performance scorecard updates; and 
(3) to otherwise note the content of the report. 
6. Risk Report and Register. 
There was submitted a report (issued) of February 2025 by the Head of Roads -
Ayrshire Roads Alliance advising on the management of risk associated with the
Ayrshire Roads Alliance. 
The Joint Committee 
Decided: 
(1) to note the risk register, as presented in the report; 
(2) to agree to continue to receive updates on progress; and 
(3) to otherwise note the contents of the report. 
The meeting ended at 10.50 a.m.
11

Page 12

12

Page 13

1 
South Ayrshire Council 
Report by the Chief Governance Officer to Ayrshire Shared Services Joint
Committee of 6 June 2025 
Subject: Ayrshire Civil Contingencies Team 
1. Purpose 
1.1 The purpose of this report is to advise the Joint Committee on progress made
against the current Ayrshire Civil Contingencies Team (ACCT) Service Plan for
2025/2026 (Appendix 1) and draw attention to any other work currently being
undertaken or developed by the team. 
2. Recommendation 
It is recommended that the Joint Committee: 
2.1 Approve the progress made against the work plan for 2025/2026 
3. Background 
3.1 The ACCT has provided civil contingencies services on behalf of the three Ayrshire
Councils since it was established in 2008. 
3.2 The Team has a responsibility to ensure the provision of the following key
requirements on behalf of the North, South and East Ayrshire Councils; 
• Operation of an on-call service to provide 24/7 response for Civil Emergencies
as the Duty Officer(s) on behalf of any of the affected Councils. 
• Preparation of a consistent Civil Contingencies Response and Recovery Plan for
approval and implementation by each of the 3 Councils. 
• Maintenance of an accurate and up to date Emergency Contact Directory for
each of the 3 Councils. 
• Development and delivery of training programmes to ensure key staff within each
Council know and understand their emergency roles and are prepared to respond
to major incidents and civil emergencies. 
• Preparation and maintenance of Contingency Plans for specific sites, which are
also tested on a multi-agency basis at 3 yearly intervals. 
• Maintenance of a range of plans to cover the response to emergencies of non-
site specific risk. 
3.3 This work is routinely monitored and evaluated by a Steering Group comprising the
Head of Service from each Council with the responsibility for Civil Contingencies.
Agenda Item 3
13

Page 14

2 
4. Progress against our Service Plan. 
4.1 Whilst the team reported a full complement of 3.5 at the December 2024 meeting,
this was since been reduced to 3 since January 2025  (due to secondment) and
again to two from April as there is currently one member of the team off sick and
not expected back until mid-July at the earliest.  This has had some impact on our
progression of our workplan but not significantly so. 
4.2 There has been continued focus since 2024 on internal training for those who will
be required to assume the roles of Council Incident Officers and Council Incident
Coordinators in the event of a major incident within any of the 3 Council areas.  We
are now about to do the second sessions for the year across the 3 councils where
we will be focussing of Recovery and what it is.  For the next session few sessions
we are planning to do specific team sessions where we can look at incidents which
will not have a full council impact, for example, the recent fire at Dalmilling which
only affected a few services, for example, Housing and Building Standards.  At the
training in late May we were given some scenarios which senior officers would like
to do as part of a smaller group within their own teams.  We are also planning to
have training for Survivor Reception Centres and Family and Friends Centres as
part of our Care for People response; as recently the HSCPs agreed that they had
the staff with the skills to assist Police Scotland in staffing these centres in advance
of them arriving. 
4.3 The ‘lunchtime learning’ initiative continues, which includes short, focused sessions
for relevant Officers covering an overview of a recent incident by the multi-agency
officers involved; the issues which arose and how these were resolved through the
incident debrief.   
4.4 The Emergency Contact Directories for the 3 Councils are currently being updated
and will be issued for June 2025.  These documents contain the contact details for
all personnel who may need to be contacted to respond to a major emergency. 
4.5 You may recall from the last report that we have Fail to Sail plans for both Arran
and Cumbrae however additional work was required for consideration of looking
after young people who were travelling alone.  This has now been resolved and a
solution has been found using the Arran Outdoor Centre.  Additionally, we have
carried out two training sessions for community volunteers to assist in the Care for
People response on Arran and we now have six volunteers who have agreed to
assist if required.  ACCT led on the exercise planning for the multi-agency exercise
which was held on 24 April and attended by over 50 responders and publicised in
the Arran Banner.  This exercise was considered very useful by those participating. 
4.6 The work to prepare for a Power Resilience emergency continues within the three
Local Authorities and all Council services are required to consider and plan for
alternative models of service delivery during this type of incident. An alternative
solution is still being sought for resilient communications as Starlink has been
paused. 
4.7 The 3 yearly review of a number of External Plans continues.  The team is currently
leading on the multi agency exercise and plan review for two COMAH sites, DM
Beith Munitions and Chemring Energetics in Stevenston which is limited live play. 
Live play exercises take much more time and effort to plan and this will be taking
place in the autumn of 2025.  We have also updated some Multi Agency Incident
Response Guides for Grissan in Girvan and for Barony in Irvine and Auchinleck.
14

Page 15

3 
4.8 As well as the Arran exercise on 24 April, we also had an exercise for Kilmarnock
FC which was also attended by Ayr United FC and gave both clubs an opportunity
to test their plans during exercise scenarios.  Ayr United now also have a Multi
Agency Incident Response Guide plan for the stadium for the first time. 
4.9 The team has significant involvement in the Council and multi agency preparation
for the Ayrshow in September.  The planned exercise for community events before
the summer has not been able to be arranged and will be rescheduled for next year
but we still hope to have an event for firework display organisers to ensure that they
are aware of their legislative and health and safety responsibilities in hosting this
type of event.   
4.10 The ACCT has assisted in coordinating the response to a number of incidents and
was highly involved in the response to the Red Weather warning on 24 January by
coordinating the multi agency partners in advance of this and throughout the
following weekend and into the next week.  The debrief of this has been completed
and the actions arising from it is being progressed by the Ayrshire Local Resilience
Partnership’s Training Exercising and Learning subgroup which we attend.  ACCT
had involvement in the Battery Recycling Centre fire in Kilwinning on 9 April 2025
and are pleased to report that any learning from the previous incident was used and
the response to the Care for People element was much smoother with the partners
immediately establishing a Care for People group and using the agenda which was
an action arising from the previous incident. 
4.11 The team have not managed to progress the Battery Energy Storage Sites (BESS)
Multi Agency Incident Response Guide due to our initial visit to the site in
Lanarkshire being scheduled for the day of the battery recycling centre fire and the
partners having to cancel but this has been rescheduled to 17 June when it is hoped
it will proceed.  Officers will, after this, be able to start developing a skeleton plan
which they can use for all the sites across Ayrshire. 
4.12 It is proposed that the Joint Committee notes and approves the work to date which
is also reflected in the ACCT Service Plan at Appendix 1 and approves the
workplan.           
5. Legal and Procurement Implications 
5.1 The recommendations in this report are consistent with legal requirements. 
5.2 There are no procurement implications arising from this report. 
6. Financial Implications 
6.1 Not applicable. 
7. Human Resources Implications 
7.1 Not applicable. 
8. Risk 
8.1 Risk Implications of Adopting the Recommendations
15

Page 16

4 
8.1.1 There are no risks associated with adopting the recommendations. 
8.2 Risk Implications of Rejecting the Recommendations 
8.2.1 Rejecting the recommendations may give rise to external criticism, breach
of statute or legal challenge. 
9. Equalities 
9.1 The proposals in this report allow scrutiny of performance. The report does not
involve proposals for policies, strategies, procedures, processes, financial
decisions and activities (including service delivery), both new and at review, that
affect the Council’s communities and employees, therefore an equality impact
assessment is not required. Any specific island issues are considered in the report.  
10. Sustainable Development Implications  
10.1 Considering Strategic Environmental Assessment (SEA) - This report does not
propose or seek approval for a plan, policy, programme or strategy or document
otherwise described which could be considered to constitute a plan, programme,
policy or strategy.  
11. Options Appraisal 
11.1 An options appraisal has not been carried out in relation to the subject matter of this
report.   
12. Link to Council Plan 
12.1 The matters referred to in this report contribute to the delivery of all Council strategic
objectives. 
13. Results of Consultation 
13.1 There has been no public consultation on the contents of this report. 
Person to Contact Lesley Jeffery – Civil Contingencies Coordinator, ACCT.
Catriona Caves, Head of Service, South Ayrshire Council.
River Terrace, Ayr
Phone 01292 616289
E-mail: Lesley.jeffery@south-ayrshire.gov.uk or
catriona.caves@south-ayrshire.gov.uk 
Date: 23 May 2025 
16

Page 17

5
Ayrshire Civil Contingencies Team – Service Plan (2025/26) - Appendix 1 
17

Page 18

6
Introduction 
1.1 The Ayrshire Civil Contingencies Service Plan covers the period 2025/2026 and sets out what
we intend to achieve over the next year based on the resources available to us. 
1.2 Effective Contingency Planning is crucial to the achievement of the combined objectives of
North, South and East Ayrshire Councils and the success of the strategic operation and
delivery of all Council Services. The Ayrshire Civil Contingencies Team (ACCT) is responsible
for developing and delivering a work plan that ensures compliance in respect of statutory
obligations and endeavours to support all Council services embed robust contingency
planning arrangements. The team will support the 3 Councils and relevant multi-agency
partners to ensure that response and recovery in the event of adverse incidents is efficient
and carefully planned.   
1.3 Actions have been formulated and form the basis of the ACCT Work Plan. This is reported on
and scrutinised quarterly by the Ayrshire Civil Contingencies Steering Group comprising of the
Head of Service from each Council with the responsibility for Civil Contingencies.  The 3
Ayrshire Council Shared Service Joint Committee has a remit to approve the plan and/or
progress made on a 6 monthly basis. We have agreed challenging targets for the team in order
to continuously improve the way we work and to take account of the statutory obligations
imposed on all 3 Councils as Category 1 responders in line with Civil Contingencies legislation. 
1.4 By planning and monitoring our progress for 2025-2026 we aim not only to contribute to the
achievement of the strategic objectives of the 3 Ayrshire Councils but also support our
colleagues within Health and Social Care, NHS Ayrshire and Arran, the Emergency Services
and a wide range of multi- agency responders. These partners form the core membership of
the Ayrshire Local Resilience Partnership (ALRP). 
2 Profile
2.1 The Ayrshire Civil Contingencies Team has a responsibility to ensure the provision of the
following key requirements on behalf of the 3 Councils; 
• Operation of an on-call service to provide 24/7 response for Civil Emergencies as the
Duty Officer(s) on behalf of any of the affected Councils.
• Preparation of a consistent Civil Contingencies Response and Recovery Plan for
approval and implementation by each of the 3 Councils.
• Maintenance of an accurate and up to date Emergency Contact Directory for each of
the 3 Councils.
• Development and delivery of training programmes to ensure key staff within each
Council know and understand their emergency roles and are prepared to respond to
major incidents and civil emergencies.
• Preparation and maintenance of Contingency Plans for specific sites, which are also
tested on a multi-agency basis at 3 yearly intervals.
• Maintenance of a range of plans to cover the response to emergencies of non-site
specific risk. 
2.2 To date the service is working within an overall net revenue budget for the team of £164,270
(2024-2025). It is delivered utilising a workforce of 3.5 FTE, however long-term absence has
been impacting staffing provision since August 2022; firstly with the ACCT Coordinator who
was off long term until the appointment of Lesley Jeffery in the Coordinator role in April 2024
and the appointment of the Officer role in July 2024 and we currently have an officer who has
been on sick leave since mid April .  Please note that we are currently reduced to 3FTE
staff. 
2.3 The income for the team will be substantially reduced going forward as there is no longer as
much work required for Hunterston B planning now that the site is defueled.  The team has
agreed to develop a MAIRG (Multi Agency Incident Response Guide) for the site and for
Hunterston A now that it can no longer be included in Hunterston B planning but this will be at
18

Page 19

7
a significantly reduced cost (if any) as we can only charge for exercise planning and plan
review.   
3 How are we doing?
3.1 Demanding performance targets are set through the Performance Development and Review
(PDR) process. This helps us embed a culture of improvement within the team and aims to 
ensure the achievement of outcomes within the Service Plan. These are further articulated
through team meetings where assigned activities are monitored and assessed. Prioritising
workloads and establishing clear deadlines are key features on the allocation of tasks. 
3.2 The Team’s performance is tracked and measured using the South Ayrshire Council
Performance Management System approach, and new initiatives progressed as the
contingencies planning landscape evolves. The team is actively supported and encouraged to
consider opportunities to introduce new and innovative ways of working. 
3.3 There has been an investment in training for the team and officers have the opportunity to
attend external events and participate in a range of external or multi-agency forums which help
ensure knowledge of best practice in Civil Contingencies.  We hope that this will continue. 
3.4 Areas identified for improvement are being taken forward and these include more regular
refresher training opportunities for key Council managers and the further development of
online e-Learning training in Civil Contingencies to extend the reach and breadth of core skills
across a wider range of participants within North, South and East Ayrshire Councils. 
4. The challenges we face
4.1 These are outlined as follows: - 
• External
An increase in adverse and concurrent incidents, emergency or weather events stretch
existing resources in terms of ensuring that Civil Contingencies responses are well planned
and tested. Additional high-profile events, which rely on Council support also place
considerable pressure on available time and expertise. Legislative change or amendment to
government policy will also impact workloads. 
• Internal
Conflicting priorities and resourcing pressures across a number of service areas can expose
gaps in terms of demonstrating a fully corporate approach to the implementation of well
embedded Contingency Planning.  There can often be challenges in terms of persuading
services of the business benefits in preparing and testing contingency plans. 
5. Detailed Service Plan
5.1 The strategic outcomes for all 3 Councils are underpinned by having robust processes for risk
management and resilience. How we intend to contribute to the successful achievement of the
3 Ayrshires’ objectives is set out in the detail in the ACCT Service Plan on the following pages.   
6. Governance
6.1 The progress made by the ACCT is analysed on a quarterly basis by the 3 Council Civil
Contingencies Steering Group. The Service Plan will be developed on an annual basis and
subject to approval and scrutiny by the Shared Service Joint Committee.   
Plans, Procedures and Guidelines 
It is important to note that by its very nature Civil Contingencies work activity is often reactive and
the team endeavour to respond to events and circumstances as they arise. The Councils’ Civil
Contingencies Response and Recovery Plans are deliberately generic and provide a framework
which allows for speedy response to emergencies as they arise. The Service Plan will therefore be
regularly updated as and when required. 
19

Page 20

8
Copies of the ACCT and other resilience documents are hosted on each Council’s Resilience Direct
page and on their shared drive system - access is limited to those who have a key role responding
to an emergency - the links are noted below. 
South Ayrshire - ACCT on Sharepoint  East Ayrshire - ACCT on Shared Drive 
North Ayrshire - on Resilience Direct 
Update Prepared – 23 May 2025  
20

Page 21

9 
APPENDIX 1
Ayrshire Civil Contingencies Team - Work Plan for April 2025 to March 2026 
The following tables outline key contingencies plans, training and exercises for the Civil Contingencies Team.
It includes work activity ongoing or completed within 2024 and further actions for 2025-2026. The ACCT is
either leading on these or providing support to other agencies on their development.  It also includes reference
to Civil Contingencies sub-groups which may be contributed to by ACCT. 
Internal Plans / Training and Exercises led by ACCT Target Date for
next review 
Civil Contingencies Response & Recovery - SAC (Review) S March 2025
June 2025
Civil Contingencies Response & Recovery – NAC (Review) N March 2025
June 2025
Civil Contingencies Response & Recovery – EAC (Review) E March 2025
June 2025
Local Incident Room Guidelines – SAC (Exercise) S Ongoing
COMPLETE
Major Accident Hazard Gas Pipelines - Ayrshire Plan (Review and Exercise) N S E  December 2023 (D)
August 2025
Care for People – Emergency Support Centres Guidelines (Review & Exercise) N S E  ongoing
Black Start and Power Resilience Recovery (Councils) N S E ongoing
Emergency Contact Directories (biannual updates June and December) N S E  June 2025
Pandemic Influenza Plan  N S E June 2025
Incident Management Training – 3 sessions per year December 2025
Note: 
• South Ayrshire Pandemic Influenza plan is complete and has been shared with BC colleagues in North and East for
their view
• Incident Management Training has been arranged for all three councils for 3 sessions each in 2025. 
Internal Plans / Training and Exercises led by ACCT – completed for
24/25 
Mobile Telephone Privileged Access System (MTPAS) N S E  December 2025
eLearning package for Community Support Centres / Care for People Awareness N S E December 2025
eLearning package for Civil Contingencies Awareness N S E  December 2025
eLearning Civil Contingencies package for Elected Members (Develop)  N S E December 2025
Former Station Hotel, Ayr - Major Incident Response Guide (MAIRG) S 
This plan has been deleted as it is no longer required June 2025 
Fuel Disruption Plan - Fleet Management  N S E December 2025
Local Incident Room Guidelines - SAC S (and review of East Ayrshire) June 2025
August 2025
Shoreline Response Plan (Develop) N S tbc
The above Plans / Training will be reviewed again prior to financial year end 2025/26. Target dates have
been amended in May 2025 via the Ayrshire Shared Service Panel report. Any additional work activity
identified will also be included within the report.   
External Plans / Training and Exercises led by ACCT  Target Date for
completion
Defence Munitions Beith External Contingency Plan (Review & Exercise)  N 2026 
Hunterston B Offsite Contingency Plan (Review and Exercise) N 
(revised plan requested by Office for Nuclear Regulation)
Reviewed 
January 2025
Hunterston B Offsite Contingency Plan (Redacted Version) N
(revised plan requested by Office for Nuclear Regulation)
Completed
February 2024
DSM (Dutch State Mining) Nutritional Products Contingency Plan (Review & Exercise) N August 2026
Chivas Brothers – Balgray and Willowyard (Review & Exercise) N  March 2027
Chemring, Stevenston External Contingency Plan (Review & Exercise) N  November 2025 
Spaceport COMAH Plan  (prepared in conjunction with identified partner) S  On hold 
Wm Grants External Contingency Plan (Review & Exercise) S  November 2027
Avian Flu Carcass Disposal Plan  December 2025
Arran Fail to Sail Plan (N) April 2025
Arran Care for People Response (N) April 2025
Cumbrae Fail to Sail Plan (N) Complete
Review 2027
Hunterston B Flask Removal Plan (N) Complete
Multi Agency Response Guide for Grissan, Girvan (S) Complete
Review 2027
Care for People Review (All) March 2025
August 2025
21

Page 22

10
Learning from Incidents Training sessions (new initiative for 2023) (All) Ongoing
Community Events Tabletop Exercise (All) (NEW) – rescheduled to 2026 May 2025
May 2026
Community Fireworks Tabletop Exercise (All) (NEW) August 2025
Note: 
• Care for People review is ongoing but is taking longer than expected. 
External Plans / Training and Exercises - Working with
Multi Agency Partners  
Lead  Target Date for
completion
Hunterston B – Training and Exercising Programme N EDF Ongoing
Black Start and Power Resilience Recovery (Multi Agency) MA  ALRP   Ongoing
Radiation Monitoring Unit Arrangements N (delayed – awaiting SG decisions)  ALRP TBC
WoSRRP Mass Fatalities Arrangements - (Review and Exercise) MA WoSRRP TBC by WoSRRP
Marine Pollution Response Plan - Girvan Harbour (Biannual Notification
Exercise, Review Plan & Table Top Ex Carrick) S MA
ARA  ongoing
Animal Health MAIRGs (Review) MA EH&TS  Complete
Glasgow Prestwick Airport Multi Agency Contingency Plan  S MA GPA
Complete
Review October
2027
Ayrshire Safer Shores Initiative Response Arrangements N S MA Police May 2025
ALRP Disruptive Weather Response Arrangements MA ALRP Complete 
Kilmarnock Football Club E  MA
Exercise is taking place on 7 March 2025 with Ayr United FC
KFC October 2027
Kilmarnock Prison E  MA
Scottish
Prison
Service
TBC
Develop ALRP Generic Response Guide (for Initial Response) ACCT March 25
Develop ALRP Response Guide / Plan to Battery Energy Storage Site
(BESS) Facilities
ACCT /
SFRS
March 25
September 25
Participate in development of ALRP Response Guide to Foxgrove facility NHS December 2024
DELAYED
Port Health Plan NEW NHS / SAC December 2025
Note: 
• Further discussions will take place on the required changes for Hunterston B as it moves out of REPPIR legislation in
early 2025.  
• Foxgrove plan is delayed as it has not yet been handed over to NHS 
Supported Tasks - Participation at Sub Groups Lead
Agency Update
Community and Business Resilience Sub Group (developing and sharing
best practice) MA WoSRRP Ongoing
Training, Exercising and Learning Sub Group (developing and sharing best
practice) MA WoSRRP Ongoing
Warning and Informing the Public – Media Plans, Websites MA Councils Ongoing
Ukraine Tactical ALRP Sub Group  MA Councils Subsumed into
other groups
ALRP Power Resilience MA Councils Ongoing
Provide Secretariat to Ayrshire Local Resilience Partnership (ALRP) MA ACCT Ongoing
Community Resilience (provide advice and support to local community
councils and resilience groups – ad hoc) MA ACCT Ongoing 
Colour coded abbreviations
Work undertaken on behalf of North Ayrshire  N
Work undertaken on behalf of South Ayrshire S
Work undertaken on behalf of East Ayrshire E
Work undertaken on behalf of ALRP or other agencies  MA (Multi Agency) 
Lesley Jeffery
ACCT Coordinator
23 May 2025
22

Page 23

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
6 June 2025 
Report by the Head of Roads – Ayrshire Roads Alliance 
AYRSHIRE ROADS ALLIANCE SERVICE PLAN 2025/26 
Purpose of report 
1 The purpose of this Report is to seek the Joint Committee approval for the
Ayrshire Roads Alliance Service Plan for 2025/26 
Recommendations 
2 It is recommended that the Joint Committee:
i.  Approves the Ayrshire Roads Alliance Service Plan for 2025/26 (Appendix
1)
ii. Notes the confirmed finance budgets for 2025/26
iii. Notes the Performance Scorecard for 2024/25 (Appendix 2)
iv. Requests that progress updates are provided to future meetings of the
Joint Committee,
v. Otherwise, notes the content of this Report. 
Background
3 The first Ayrshire Roads Alliance Service Plan for 2014/15 was approved by Joint
Committee on 23 May 2014.  As part of all Service Plans it was agreed that the
draft Service Plan is approved prior to submission to both East Ayrshire Council
and South Ayrshire Council. 
Main report/main issues 
4. The service plan included in Appendix One provides detail on the current
operating position of the Ayrshire Roads Alliance and sets out the vision, aims
and objectives for the 2025/26 financial year. 
The activities to be undertaken in support of these objectives are as follows:- 
• the service ten year review; 
• the Performance Management Framework as approved and updated at
every Joint Committee;   
• the Risk Register and Report which has established a method of effective
management of risk to ensure service improvement through better service
delivery; increased certainty and fewer surprises; more effective and
Agenda Item 4
23

Page 24

efficient management of resources; reduced waste; and better
management at all levels through improved decision-making; and 
• the Benefits Realisation Strategy and Plan which sets out how benefits will
be tracked and controlled across the fully integrated Roads service and
which was approved by the Joint Committee in on 1 May 2015. 
4. The Service Plan reflects the settled position in terms of South Ayrshire Council
and east Ayrshire Council budgets both approved on 27th February 2025 and
describes the challenges and the targets for the service. 
5. In addition to Revenue Budgets, the Ayrshire Roads Alliance receives budgets
from other sources including capital, and grants from the Scottish Government,
Strathclyde Partnership for Transport; and other organisations including both
external to the Council and internal Council Departments. 
6. The Ayrshire Roads Alliance has been in operation for just over eleven years,
and has achieved a significant amount in that time. The new integrated operating
model provides an excellent platform for service delivery and will continue to
facilitate a number of continuous improvement initiatives. 
7. Significant challenges lie ahead in terms of maintaining good performance,
dealing with financial pressures and their impact on service delivery and
delivering on the Benefits Realisation Strategy and Plan to ensure that all the
revenue saving targets are met. The Benefits Realisation Strategy and Plan was
approved by the Ayrshire Shared Services Joint Committee on 1 May 2015. 
8. The Service Plan contains a change programme, which is complemented by the
Business Realisation Strategy and Plan. This has been designed to enable the
Ayrshire Roads Alliance to achieve the objectives of the detailed business case
set out in June 2013. 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning X  9 & 10
2. Governance X  11
3. Human Resources X  12
4. Equality and Fairer Scotland Duty X  13 & 14
5. Financial X  15
6. Risk X  16
7. Community Wealth Building X  17
8. Net Zero X  18 
24

Page 25

Policy/strategic planning implications 
9.  A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire and the wider road
network; improve community safety; improve road safety; improve the
infrastructure and help reduce road accidents. 
10. The matters referred to in this report contribute to Priority 1 of South Ayrshire
Council Plan: Spaces and Places / Moving around and the environment –
“Everyone can access streets, places and spaces that make a positive
contribution to wellbeing, are well connected, well designed and maintained” 
Governance Implications 
11. The work of the Ayrshire Roads Alliance is undertaken in accordance with
relevant legislation.             
Humans resources Implications 
12.    The Service Plan has no direct impact on human resources.  However, as the
Improvement Action Plan work develops, and reviews are completed, it is
expected that some impact on human resources will arise. 
Equality impact and Fairer Scotland duty implications 
13. The proposals in this report allow scrutiny of performance (Ayrshire Roads
Alliance 2024/2025 Performance Report). The report does not involve proposals
for policies, strategies, procedures, processes, financial decisions and activities
(including service delivery), both new and at review, that affect the Council’s
communities and employees, therefore an Integrated Impact Assessment is not
required. 
14. In relation to the Ayrshire Roads Alliance 2025/2026 Service plan, this is a
combination of both operational and strategic priorities and the equality impact
assessment paperwork has been previously carried out as part of Cabinet papers
and will be carried out in the future where appropriate. 
Financial implications 
15.      The Ayrshire Roads Alliance delivers the strategic and local services as stated in
the Service Plan.  The budget is provided by East Ayrshire Council, South
Ayrshire Council, and other external organisations.  Appropriate scrutiny
arrangements are in place to manage these budgets           
Risk implications 
16.     The Risk Register assists in the prioritisation of risks that need to be mitigated by       
the Ayrshire Roads Alliance in order to reduce the overall risk to either Council       
and to comply with the Community Plan/Council Plan in both partner bodies. 
25

Page 26

Community Wealth Building implications 
17. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people 
Net zero implications 
18.   The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
26

Page 27

Appendices (if applicable) 
1 The Ayrshire Roads Alliance Service Plan - 2025/26 
2 Ayrshire Roads Alliance Performance Scorecard 2024/25 
Background papers 
1. Benefits Realisation Strategy and Plan – 1 May 2015 – Joint Committee 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
27

Page 28

1 
Official 
Appendix 1 
Service Plan 2025-2026 
April 2025 
A Partnership between East Ayrshire Council and South Ayrshire Council
28

Page 29

2 
Official
Table of Contents
INTRODUCTION ............................................................................................................................................. 3
STRATEGIC CONTEXT ................................................................................................................................... 14
SERVICE PERFORMANCE FRAMEWORK....................................................................................................... 15
RISK, OPPORTUNITIES and CHALLENGES ..................................................................................................... 18
PROFILE OF SAVINGS AND COSTS OVER THE FIRST 10 YEARS ..................................................................... 22
AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2023/24 ......................................................... 24
APPENDIX 1 – ORGANISATIONAL CHART .................................................................................................... 33
APPENDIX 2-STRATEGIC AND LOCAL DELIVERY SPLIT … .............................................................................. 34
29

Page 30

3 
Official
INTRODUCTION 
The Ayrshire Roads Alliance is a shared integrated roads and transportation service
which provides the roads service for East Ayrshire Council and South Ayrshire Council.
The Service is delivered with the overall objective of improving the road and
transportation service in the East Ayrshire and South Ayrshire areas to move the Ayrshire
Roads Alliance to a position that will deliver at least £8.634 million of savings by 2024.
The Ayrshire Roads Alliance is governed by the Ayrshire Shared Service Joint
Committee. The Joint Committee has responsibility for all shared Council services in
Ayrshire. 
The Shared Services Minute of Agreement describes the functions of the Joint Committee
as follows:
• making decisions within the confines of the service budget,
• developing and implementing a strategic policy framework,
• co-ordinating, monitoring and reviewing service performance,
• monitoring budget spend,
• considering and approving an annual Service Plan.
In addition, the "Joint Committee Arrangements for the Ayrshire Roads Alliance"
document covers those issues that are specific to the Ayrshire Roads Alliance. 
The two Councils involved in the Ayrshire Roads Alliance have each appointed four
Elected Members to the Joint Committee. Meetings take place as often as required to
conduct business, but at least twice per year in line with the terms of the Minute of
Agreement. 
The Alliance is responsible for all the roads and transportation activities listed in Appendix
2, split between strategic and local delivery, that are the responsibility of East Ayrshire
Council and South Ayrshire Council. Both Authorities retain the role of Roads Authority
under the Roads (Scotland) Act 1984 - Section 1.
30

Page 31

4 
Official
East Ayrshire Council - Strategic Issues 
The East Ayrshire Community Plan is the sovereign and overarching planning document
for the East Ayrshire area, providing the strategic policy framework for the delivery of
public services by all local Partners. The Plan is the Council’s Corporate Plan and covers
the 15 years from 2015 to 2030. 
The Vision contained within the Community Plan is shared by all Partners and states that:
“East Ayrshire is a place with strong, safe, vibrant communities where
everyone has a good quality of life and access to opportunities, choices
and high quality services which are sustainable, accessible and meet
people’s needs.”
The Community Plan is implemented through three thematic Delivery Plans - Economy
and Skills, Safer Communities and Wellbeing. The Plan is also implemented through
the day to day work carried out by services across the Council. 
East Ayrshire Council Strategic Plan 2022-2027 
This plan sets out our priorities for the communities of East Ayrshire over the next five
years and describes the context in which our services will work collaboratively with
each other, our communities and our partners to drive forward the actions needed to
achieve our aims. This will include prioritising the resources that are entrusted to us and
continuing to find new and innovative ways of working, to ensure the delivery of
services that are affordable, sustainable and which best meet the needs of those we
serve. The Plan recognises the strengths and assets that exist within East Ayrshire and
highlights the ambitions we have for our communities. However, it is written against a
backdrop of what are unprecedented challenges for both our Council and for those we
serve. These challenges include: 
• Rising inflation and increases in the cost of living
• Increased demand for services
• Restrictions in funding
• Pandemic Recovery and Renewal
• Public Sector Reform
• The impact of EU Exit
The Strategic Plan priorities take account of the communities we serve, including local
needs, circumstances and aspirations; the current internal and external context in which
the Council operates; national and local drivers for change, including risks, challenges
and opportunities; governance arrangements; programme management and
performance measurement. Our priorities build on the work of our previous two
Transformation Strategies and our Covid-19 Recovery and Renewal Dynamic Action
Plan. It is important to recognise that there are commonalities and interdependencies
across and between our priorities. 
31

Page 32

5 
Official
• Building a Fairer Economy
• Tackling Poverty and Inequality
• Improving Community Wellbeing
• Supporting Children and Young People
• Delivering a Clean, Green East Ayrshire
• Ensuring Financial Sustainability and Resilience
Service Improvement Plans are an essential element of the Council’s performance
management and improvement framework. They set out the key issues for delivering
services in support of the Community Plan Vision and priorities, provide a focus on
performance improvement aligned to the Single Outcome Agreement and describe the
service specific risks that may impact on the delivery of the Service. 
The diagram below provides a graphic representation of the Council’s Policy Planning
Framework and shows the strategic context within which the Service Improvement Plans
sit. In addition it shows the wider Performance Management and Improvement
Framework which the Council has adopted to ensure the rigorous scrutiny of
performance and drive service improvement across the Council. 
32

Page 33

6 
Official
South Ayrshire Council - Strategic Issues 
The Council Plan 2023-2028 sets out the Council’s vision for the next five years, with a
focus on “Our Pupose”,Our Vision”,”Our Values”. The Plan details the high-level
objectives and outcomes to be achieved by 2028. 
The Council’s priorities and outcomes place an emphasis on the connection between our
places and the wellbeing of our communities and environment. The place-based
approach recognises that every area has a different blend of physical, social, and
economic characteristics that influence each other and aims to address complex
problems that no service alone can solve. The priorities provide a common framework,
aimed at promoting a shared understanding that encourages services and partners to
work collaboratively to achieve improved outcomes and wellbeing for our communities.
• Priority One Spaces and Places
• Priority Two Live, Work, Learn
• Priority Three Civic and Community Pride
The Ayrshire Regional Growth Deal 
The three Ayrshire Councils have worked in partnership with other agencies,
communities and businesses to secure the first Regional Growth Deal in Scotland. This
will see £251.5 million of investment in key assets and key sectors across Ayrshire,
underpinned by an ambition to facilitate economic growth across the region. The projects
within the Growth Deal offer the best opportunity to attract private sector investment into
Ayrshire and to transform the area. It is considered that the various interventions in the
Growth Deal will unlock £300 million of private investment and deliver around 7,000 new
jobs across a wide range of sectors. 
There are currently no transport projects within the Ayrshire Growth Deal proposed for
East Ayrshire Council however the Ayrshire Roads Alliance recognise the strategic
importance of Bellfield Interchange and will continue to work with colleagues to secure
the improvements required. 
South Ayrshire Cabinet approved the ARA recommendation to discard the historic 3
phased roads enabling projects associated with the Ayrshire Growth Deal (AGD) at the
cabinet meeting of 29th August 2023.  A STAG (Scottish Transport Appraisal Guidance)
compliant process has been carried out to assess the roads enabling infrastructure
requirements to allow the Ayrshire Growth Deal development to progress. The outcomes
of the STAG will ensure that the most suitable solution is developed and that the AGD
Roads project can progress to Outline Business Case (OBC) and subsequently Full
Business Case (FBC).   
By carrying out extensive modelling of the existing road network around Glasgow
Prestwick Airport/Ayrshire Growth Deal cluster and building on the LDP2 no net detriment
approach to the road network the Ayrshire Roads Alliance was able to stress-test the
road network and identify the following improvements which will reduce peak congestion,
build capacity into the network to facilitate future growth, improve road safety and journey
time reliability :– 
33

Page 34

7 
Official 
1.1 – Sandyford Toll Roundabout capacity improvements 
1.2 – Dutch House Roundabout capacity improvements 
1.3 – Monktonhead Roundabout capacity improvements 
1.4 – A79/Station Road Roundabout capacity improvements 
1.5 – Shawfarm Road Roundabout capacity improvements 
1.6 – Shaw Road/Shawfarm Road junction re-alignment/improvements 
1.7 – Active Travel links from existing network to AGD Commercial Build 
1.8 – Public Transport Infrastructure improvements 
Points 1.7 & 1.8 compliment the project currently being progressed under the de-
carbonisation of the road network being developed by the Ayrshire Roads Alliance and
funded by the successful Levelling Up Fund round 3 award. 
At this stage no costs have been associated to each of the mitigation measures above
with a high-level costing exercise undertaken as part of the OBC process. It is envisaged
that the available funding from the AGD Roads Enabling project will not be sufficient to
implement all of the above measures, should this be the case the projects will be ranked
by a benefit to cost ratio and a report submitted to Cabinet for further approval. 
A Case for Change has been submitted to Scottish & UK Governments seeking approval
of the changes noted above,ASTAC and  the Prestwick Proposition, the Ayrshire Roads
Alliance will assist in the delivery of all of the Road Schemes and Prestwick Proposition 
projects for South Ayrshire Council. 
STPR2 
Ayrshire’s key transport routes (road, rail, sea and air) are critical for businesses to enable
goods to get to market, our communities to employment and for training opportunities. A
number of key route improvements have been identified. 
The new Strategic Transport Projects Review was published in December 2022 and
included all modes of travel including active travel and public transport. In addition, this
work will develop transport projects outputs at a national, regional and local level. 
Due to Covid-19, Transport Scotland restructured the STPR2 into two phases. Phase 1
focussed on the short-term (up to 5 years) with a view to identifying interventions which
can be accelerated to support a green economic recovery from Covid-19, and also
those which embed, support and extend any increase in travel by sustainable travel
modes, including positive behaviour change seen during the pandemic. Phase 2
completed the review and the report was published in December 2022, giving Scottish
Ministers a programme of potential transport investment opportunities for the period
2022-2042. 
STPR2 makes 45 recommendations that focus investment on sustainable transport
options. Of those recommendations 28 provide benefits for individuals, families,
communities and businesses across most parts of Scotland. 
34

Page 35

8 
Official
Of the 45 recommendations the following have a particular benefit to the Ayrshire and Arran
Region: 
• Supporting Integrated Journeys at Ferry Terminals 
• Ferry Vessel Renewal and Replacement and Progressive Decarbonisation 
• Investment in Port Infrastructure to Support Vessel Renewal and Replacement
and Progressive Decarbonisation 
• Rail Freight Terminals and Facilities 
With recommendation 40 being Specific to the Ayrshire and Arran Region: 
• Access to Stranraer and the Ports at Cairnryan 
Levelling Up Fund
South Ayrshire Council successfully secured £20million of funding from the Leveling Up
Fund (LUF) round 3, £16million of this funding will be utilised for the redevelopment of
Burns Statue Square with the remaining £4million allocated to Active Travel. East
Ayrshire Council were unsuccessful in securing funding in round 3 to improve the Bellfield
Interchange.
Burns Statue Square  is a key initiative emerging from the Town Centre Framework, it is
a priority project to support placemaking and make the town a more successful place to
live, work, visit and enjoy. The project’s purpose is to reshape the southern entrance to
the town centre as a new attractive and appealing gateway, involving rationalisation/
realignment of road carriageways to create opportunity for more useable, connected,
pedestrian friendly, high quality public realm space and arrival point. The project seeks
to connect town centre to a new transport interchange, involving a reconfigured rail station
and potential co-location of the town’s bus station, support retention of the town’s major
cinema and kick-start regeneration south of the town centre to form a vibrant new
southern Gateway to the Town. The Ayrshire Roads Alliance intend to utilise the SCAPE
Framework to direct appoint Balfour Beattie to deliver the project on a Design & Build
basis due to the fixed budget and completion deadline of 31st March 2027.
The Ayrshire Roads Alliance will construct a new Active Travel Route linking Dundonald
to Barassie Station, £1.2million of LUF funding will be used to match-fund £2.8million of
additional funding secured from the Active Travel Infrastructure Fund (ATIF). The
remaining £2.8million of LUF funding will be allocated to improving the existing NCN7
from Prestwick to Barassie railway stations, these improvements will compliment further
active travel routes which will be delivered as part of the Ayrshire Growth Deal. In addition
a further application will be submitted to ATIF to further improve the NCN7 Prestwick to
Barassie. 
35

Page 36

9 
Official 
Our Current Service Resources
Table 1 – The Ayrshire Roads Alliance Assets (as at 31 March 2025) 
Asset Inventory Data as of 31st March 2025
Asset Type Units East Ayrshire
Council
South Ayrshire
Council
Totals
Carriageway km 1,228 1,183 2,411
Footways & Footpaths km 1,028 945 1,973
Street Lighting Columns No. 21,457 20,488 41,945
Illuminated Signs &
Bollards
No. 1,425 1,296 2,721
Structures No. 618 371 989
Retaining Walls km 7 3 10
Length of Sea Defences km 0 24 24
Piers and Harbours No 0 1 1
Cattle Grids No. 11 34 45
Traffic Signals
Zebra Crossings
No. of Sets
No. of Sets
99
27
92
0
191
27
Variable Message Signs No. 123 45 168
Vehicle Activated Signs No. 156 60 216
Real Time Passenger
Information
No. 67 50 117
Gullies No. 27,455 26,633 54,088
Grit Bins No. 760 296 1056
Weather Stations No. 3 1 4
EV Dual Chargers No 63 36 99
36

Page 37

10 
Official
Depots No 1 2 3 
Staff, Property and Fleet 
The Ayrshire Roads Alliance has depots located at Gauchalland in Galston; Meadowhead
in Coylton and Grangestone in Girvan. Offices are located in Kilmarnock, Ayr and at
Girvan Harbour. We also have extensive vehicles, plant and equipment to allow our
service to be delivered. 
There will be an ongoing need for property and accommodation across the area for the
Ayrshire Roads Alliance; for vehicle and equipment storage; and maintenance and staff
facilities. It is important that property and accommodation is safe, secure, fit for purpose,
and strategically placed to minimise the time spent travelling from depot toworkplace
to maintain the road asset, minimise the associated vehicle wear and tear, and emissions. 
From April 2014, the following actions have been taken in relation to property and
accommodation:
• Gauchalland Depot - Street lighting operations have moved from Munro Place in
Kilmarnock to Galston.
• The street lighting technical team was located at the Johnnie Walker Bond in
Kilmarnock which provided a more centralised service. Following a further review
this team is now located at Galston depot
• The closure of the Underwood Depot in Cumnock saw staff re-located to the
Gauchalland Depot in Galston.
• All salt for the Ayrshire Roads Alliance previously stored in the Underwood Depot
is now distributed from the Meadowhead Depot in Coylton.
• A rationalisation of fleet across the Ayrshire Roads Alliance has taken place
resulting in a reduction in cost.
Further office developments include staff transferring from the Johnnie Walker Bond to
the Opera House in Kilmarnock and from Burns House to Wellington Square and Town
Hall in Ayr which was restricted due to COVID guidance. 
Staff have now returned to the Opera House Kilmarnock on a rota based model with posts
designated as fixed, flexible and mobile. 
Staff returned to County Buildings and Ayr Town Hall in June 2022 on a rota hybrid model
and in 2024 there was a move of all ARA staff except for Parking Attendants from Ayr Town
Hall to County Buildings. 
Depots at Galston, Ayr and Girvan are fully operational with improvements planned for
the Ayr and Girvan Depots this financial year. 
Our key messages from this work include:
The Ayrshire Roads Alliance completed an organisational review which delivers the
current management structure which has generated £326,000 of revenue savings per
year. This will contribute £2.242 million towards the Business Case savings target of
37

Page 38

11 
Official
£8.634 million. The Joint Committee agreed to this review on 1 April 2016, and the work
was completed during 2017/18. In accordance with good management practice the
Alliance continued to review staff provision, and completed the service re-design during
2021/22 with management actions realising a saving of £190,000, parking £86,000
and £293,000 in South Ayrshire. 
The Ayrshire Roads Alliance completed a depot review which has resulted in £404,362
of revenue savings by 2024. This included the closure of the Underwood Depot with staff
transferring to Gauchalland Depot; and the Munro Place Street Lighting Depot with all
street lighting staff now being based in Gauchalland. In accordance with good
management practice the Alliance will continue to review depot and accommodation
provision. 
The Ayrshire Roads Alliance has completed the fleet review which has resulted in
£1,350,699 of revenue savings by 2024. In accordance with good management practice
the Alliance will continue to review fleet and plant provision. 
An Organisational Chart is shown in Appendix 2. 
Budgets
The Ayrshire Roads Alliance delivers the strategic and local services as stated in this
Service Plan and listed in Appendix 2. 
The budget to deliver these services is provided from East Ayrshire Council, South
Ayrshire Council, and other external organisations.
Budgets for 2025/26 are confirmed and this is reflected in Tables 1 and 2. 
Table 1 - Budgets 2025/26 
Council Revenue Non - Revenue Total (£m)
East
Ayrshire
Council  £6.712m £11.963m
(Confirmed)
£17.003m
(Potential)
£18.675m
(Confirmed)
£23.715m
(Potential)
South
Ayrshire
Council
£7.011m £25.212m
(Confirmed)
£37.534m
(Potential)
£32.223m
(Confirmed)
£44.545m
(Potential)
Total £13.723m £37.175m
(Confirmed)
£54.537m
(Potential)
£50.898m
(Confirmed)
£68.260m
(Potential) 
38

Page 39

12 
Official 
Table 2 provides the current non-revenue budgets for 2025/26
Table 2- Non-Revenue Budgets
Funding Source Type/Level of Funding Annual Budget 2025/26
East Ayrshire Council
Carriageway
Footway
Street Lighting.
Traffic, Transportation & Road
Safety.
Bridges & Culvert (inc Road Slips)
Car Parks inc Multi-Storey
demolition
School Streets
Fleet
£2.305m
£0.150m
£0.215m  
£0.330m
£3.500m 
£0.820m
£0.050m
£0.600m
Current approved budget
£7.970m at Cabinet
meeting of 12 March
2025.
Scottish Government Active Travel Tier 1
Road Safety Improvement
Fund. 
Active Travel – Tier 2
People & Place Behavioural
Change
Electric Vehicle
Infrastructure Fund (EAC
Lead Authority) 
£0.758   
£0.270 (TBC)   
£4.500m (TBC)   
£0.039m   
£2.800m 
Strathclyde Partnership for
Transport
General bus infrastructure  £0.270m TBC
Scottish Timber Transport Group Projects No funding awarded for
25/26
Developer Contributions Rural route action plans £0.396m 
Funding Source Type/Level of Funding Annual Budget
2025/26
South Ayrshire Council
Roads Improvement Plan 
Street Lighting
Bridge Works
Victoria Bridge
Millennium&Craigholm
Bridges   
C12 Dunure Slope
Stabilisation   
Vehicle Restraint
barriers
Cattle Grid Renewal
Girvan Harbour Jetty
Repairs 
£1.581m
£0.150m
£0.600m
£0.281m 
£0.145m 
£0.130m  
£0.073m 
£0.033m   
£0.504m 
£4.436m
(Confirmed at
Cabinet meeting on
29 April 2025)
39

Page 40

13 
Official
Local Flood Risk Plan
Ayr Depot     
Climate Change
EV Charging
infrastructure
£0.153m
£0.250m
£0.255m 
£0.281m
Scottish Government Levelling Up Fund Round 3:
• Dundonald to Barassie
• Prestwick to Barassie
• Burns Statue Square 
Active Travel Tier 1
Road Safety Improvement Plan
Active Travel Tier 2
People & Place - Behavioural
Change
Electric Vehicle Infrastructure
Fund 
(Pan Ayrshire funding) 
£ 1.200m 
£ 2.800m   
£16.000m 
£ 0.737 
£0.270 (TBC)   
£8.505m (TBC)   
£0.039m 
Budget indicated in  
EAC above.
Strathclyde Partnership for
Transport
General bus infrastructure £0.100m (TBC)
Sustrans Projects £3.447m (TBC)
Scottish Timber
Transport Group
Projects No funding awarded for
2025/26
40

Page 41

14 
Official
STRATEGIC CONTEXT 
EAST AYRSHIRE COUNCIL 
The Community Plan 2015 - 2030 includes a Safer Communities Delivery Plan, which
sets out the key actions to be undertaken and also measures progress. The Delivery
Plan contains three distinct strategic priorities, all of which will be influenced by the
activities undertaken by the Ayrshire Roads Alliance. These are:
• Make East Ayrshire a safe, secure and attractive place to live, work and visit.
• Improve community safety in neighbourhoods and homes and protect and
support our most vulnerable individuals and families.
• Promote our vibrant communities by encouraging active and responsible
citizenship.
Single Outcome Agreement (SOA)
The SOA was reviewed and developed as a key element of the comprehensive review
of the Community Plan to ensure alignment with strategic priorities and high level
local outcomes. There are a number of National Outcomes which are supported by the
activities undertaken by the Ayrshire Roads Alliance. The Community Planning
Partnership receives an annual report in September each year at which they are advised
of progress against the local outcomes previously agreed. 
SOUTH AYRSHIRE COUNCIL – 
The Local Outcomes Improvement Plan and Local Place Plans were introduced in 2017.
The plan focuses on two strategic themes which emerged from the development process. 
• Closing the poverty-related outcomes gap for children and young people in
South Ayrshire
• Supporting older people to live in good health
The Plan is supported by a partnership wide focus on four priority areas
• Improving outcomes for looked after children and care leavers
• Providing support for young people who are carers
• Reducing social isolation and loneliness
• Support for people living with dementia and their carers
There will be an effort to improve outcomes for children and older people particularly in
the Ayr North and Girvan Glendoune areas, and to identify transferable good practice to
be used to support outcomes improvement in other parts of South Ayrshire. The work
on progressing this work is taking place within the auspices of the Integrated Children’s
Services Strategic Delivery Partnerships and the Health and Social Care Partnership and
this is supported by appropriate partnership work.
41

Page 42

15 
Official
SERVICE PERFORMANCE FRAMEWORK 
PERFORMANCE AND BENCHMARKING 
The Councils’ performance management frameworks operate on a number of
levels providing detail on strategic priorities, operational priorities and day to day
management information. Within the Ayrshire Roads Alliance, the approach is fully
integrated and aligned with the corporate frameworks. 
• Strategic (Community Plan and Single Outcome Agreement; and Local
Outcomes Improvement Plan)
• Operational Priorities (Council performance indicators)
• Management information (operational statistics, corporate measures of
performance)
Strategic Issues
East Ayrshire Community Plan 2015-30. The Community Plan includes three Delivery
Plans, which set out the key actions to be undertaken and measures to progress against
them. The Delivery Plans contains distinct strategic priorities, which will be
influenced by the activities undertaken by the Ayrshire Roads Alliance Service.
Single Outcome Agreement. The single outcome agreement has been reviewed and
developed as a key element of the comprehensive review of the Community Plan in
2014/15 to ensure alignment with strategic priorities and high level local outcomes.
Operational Issues
Council Performance Indicators.
The Ayrshire Roads Alliance reports on a number of performance indicators through an
electronic Performance Management System. A management framework has been
developed, which has been approved by the Joint Committee. The data includes both
contextual and performance information thereby allowing statutory returns to be made
facilitate benchmarking provide each Council and the Joint Committee with the
information they require to monitor performance. 
A performance scorecard is produced as an integral part of the Ayrshire Roads Alliance
which is reviewed at the monthly Ayrshire Roads Alliance Management Team meetings
and reported to every Joint Committee.
This scorecard is used to:
• monitor the progress in meeting the Ayrshire Roads Alliance’s objectives;
• help managers to have performance-related conversations with staff;
• identify any problem areas that need addressed.
42

Page 43

16 
Official
Performance Management System
Relevant information contained within the Performance Management System is provided
for each four week period in a scorecard which is used by the Depute Chief
Executive (Safer Communities) and the Head of Service to monitor performance
activity and improvement within their respective management team meetings. 
SCOTS/APSE Benchmarking Framework 
The Society of Chief Officers of Transportation in Scotland (SCOTS) and the Association
for Public Sector Excellence (APSE) have developed a series of indicators to utilise
SCOTS definitions using a single template. 
The Alliance participates in the SCOTS/APSE benchmarking framework through the
APSE Annual Return; the SCOTS/Institution of Civil Engineers “state of the network”
annual return; and the Scottish Road Maintenance Condition Survey. 
Local Government Benchmarking Framework
The Local Government Benchmarking Framework (LGBF) collates information from
the APSE Annual Return that is published by the Improvement Service with specific
actions to improve performance.
Monitoring and Review 
Monitoring of the service plan is the responsibility of the Joint Committee. An annual
review will be completed and reported to the Joint Committee and both Councils. The
Joint Committee will receive a six monthly update on the Service Plan progress. In
addition, separate monthly meetings are held with the Depute Chief Executive
responsible for the provision of the roads service within East Ayrshire Council; and the
Executive Director responsible for the provision of the roads service within South Ayrshire
Council. 
Scrutiny in respect of the Joint Committee is undertaken by both Councils in accordance
with their own processes as set out within their respective Corporate Governance
arrangements. Matters in relation to service performance will be closely monitored by
both Councils through the Joint Committee. 
QUALITY MANAGEMENT AND ASSESSMENT
European Foundation for Quality Management (EFQM) Excellence Model
The European Foundation for Quality Management (EFQM) Excellence Model is a
practical self-assessment tool designed to promote continuous improvement within
organisations by assessing their performance against concepts of tested and recognised
good management practice. The EFQM Model is the cornerstone of Best Value. The
service also has an externally accredited Quality Management System.
43

Page 44

17 
Official
ENGAGEMENT WITH SERVICE USERS 
The Ayrshire Roads Alliance will continue to undertake engagement with relevant service
users. This engagement will take a number of forms through informing, consulting,
involving, collaborating or empowering our service users. 
Through 2025/26 we will continue engagement with our customers to ensure we
maximise the involvement of our service users. 
The Association for Public Service Excellence (APSE) who work with over 300 Councils
through the UK to promote excellence in the delivery of frontline services to our local
communities have developed the Scotland Roads Survey in conjunction with the Society
of Chief Officers of Transportation in Scotland (SCOTS). 
The Survey will be used to gauge customer service and user experience/satisfaction of
winter gritting, road works, road safety and other road maintenance related matters within
East Ayrshire Council and South Ayrshire Council. 
The information gathered from the survey will help shape future service delivery and
inform on performance. 
The link on the Ayrshire Roads Alliance website to the East Ayrshire Council and the
South Ayrshire Council survey forms is below
https://www.ayrshireroadsalliance.org/Information-On/Consultations/Current-consultations/the-
association-for-public-service-excellence-apse-road-condition-survey.aspx
CONSULTATION WITH EMPLOYEES 
Employee Engagement 
The Employee Attitude Survey identified a number of issues to be addressed. Employee
engagement will continue through 2025/26 and this will take many forms including
management meetings; team meetings and staff forums. The staff forums will take place
when important Council or service information requires to be provided to staff. 
Trade Union Meetings 
The Alliance will continue to engage with the Trade Unions through the established JCC
process which involves meetings at a Corporate; Service and work specific level.
44

Page 45

18 
Official
RISK, OPPORTUNITIES and CHALLENGES 
Risk 
The Ayrshire Roads Alliance records risk using a “five by five” scoring matrix, for the risks
identified which quantifies the assessment of the likelihood and severity of a particular
risk occurring. This information is hosted on the Performance Management System and
it is used to understand the impact of proposed controls and mitigations on the overall
risk profile. This is a widely used tool in risk management. 
The service risk register, and the Corporate Risk Registers, are aligned to the approach
of identifying and recording risk, which ensures a consistent approach to service level
risk recording. This allows service objectives and priorities, performance measures and
service risks to be captured in a single document. These areas are closely aligned, and
this approach offers benefits in business planning, service delivery, and performance and
risk management. 
The risk register for the Ayrshire Roads Alliance is presented to every meeting of the Joint
Committee.
There continues to be a number of opportunities and challenges which the Ayrshire
Roads Alliance faces over the next twelve months. 
Opportunities
The opportunities include the following
• Although the Organisational Review was approved by Joint Committee on 1 April
2016 and implemented during 2017/18, we continued to review staff provision
during 2020/21 as part of service re-design reported and approved by Cabinet 23
February 2022 the transformation and redesign was implemented from 1 April
2022.
• The Plant & Fleet review from June 2016 was implemented immediately. However,
with new technology and the need to increase the number of electric vehicles then
all plant and fleet will continue to be reviewed during 2025/26.
• The property and accommodation review from November 2016 and all the actions
have been implemented. Nevertheless, with more agile and remote working, the
Alliance will continue to review these issues during 2025/26, as part of the service
re-design.
• The opportunity to continue to make significant revenue budget savings through
the replacement of existing street lighting units with LED units cannot be
understated. Work commenced in 2018/19 with work programmed to be
completed in 2021/22, however completion has been delayed due to COVID and
the impact of material shortages. Currently 96% of street lanterns in East Ayrshire
and 100% of street lanterns in South Ayrshire are LED. 
45

Page 46

19 
Official
• It was expected that street lighting revenue delivery cost would reduce by more
than 50%, however, the current challenge against this, is the current rising energy
costs as a result of wider economic issues.
• Use of Digital software to improve our gully, culvert, and harbour infrastructure
management and mobile working.
• Moving all our permits over to a digital platform and our TTRO process was
recognised in March 2023 and March 2024 at APSE Innovation awards.
• Further development of digital systems for Traffic Signal permits, Management of
External Works, Critical Incidents and Driver Assessments which won a bronze
award from APSE in 2025.
• Continued support offered to other services across both East and South Ayrshire
to help facilitate improvements to their digital systems and in partnership with our
colleagues in Education the development of a digital system to manage ASN
Transport applications and the associated contracts.
• Ten year review of the business plan to be undertaken during 2025/26.
Challenges
There are a number of challenges the Ayrshire Roads Alliance will face in 2025/26
which include the following
External
• There is the potential to increase the utilisation of electric cars and vans to comply
with emission standards and the Scottish Government decision to ensure that all
new cars and vans are not powered through fossil fuel means by 2040. This will
result in the reduction in harmful emissions, and an improvement to air quality. 
• The Transport (Scotland) Bill places increased emphasis on low emission zones;
smarter ticketing arrangements; the increased role and powers for the Roadworks
Commissioner; the ban on pavement and double parking; the workplace parking
levy and the ability for Councils to run public bus services. 
• The National Transport Strategy will focus on sustainable, inclusive and accessible
transport systems to promote prosperity, health and fairness. The Sustainable
Transport Hierarchy will be used to inform budgetary decisions with walking first;
then cycling; public transport; taxis and shared transport and then the private car.
There is a need on many levels for more active travel and public transport use
across Scotland. The Sustainable Investment Hierarchy will be used to inform
budgetary decisions – reduce the need to travel; maintain existing assets; make
better use of existing capacity; and finally targeted infrastructure improvements. 
• The National Transport Strategy has identified the need to focus on increased
collaboration, and this was considered through the Roles and Responsibilities
Working Group which made recommendations to the Scottish Ministers including
46

Page 47

20 
Official
that future transport governance arrangements should be on the basis of some
form of regional model allowing for variations in approach between different
geographic regions; and there is the potential for continuous increases in the unit
costs of electricity due to on-going energy costs. The Department of Energy and
Climate Change has predicted that electricity prices are likely to double within the
next ten years. SCOTS reported a 20% increase in energy costs with further
increases possible in the future.
• However, as the programme for LED lights is nearing completion then the impact
of this specific challenge may be reduced.
• Ensure the current Regional Transport Appraisal work aligns with the needs of
East Ayrshire and South Ayrshire Council.
• Issues with the renewal of Scotland Excel framework contracts resulting in delays
to procurement processes and therefore works programmes and resulted in added
pressures on our procurement team
• Material and sub contractor cost increases and budgetary pressures restricting
work programmes
Internal
• There are increased austerity measures resulting in need to drive further efficiency
savings over and above the £8.634m identified in the Benefits Realisation Strategy
& Plan which was presented to Joint Committee on 1 May 2015.
• The need to increase the level of mobile working across the Ayrshire Roads
Alliance workforce as a direct result of implementing the Roads Asset
Management Plan and the impact of COVID. This has resulted in an increase in
mobile technology, full use of the WDM Roads Maintenance and Management
System, Artificial Intelligence and the decrease in the demand for desk and office
space. As a result of COVID many of the aforementioned have been accelerated
by the service in particular reduced desk space, mobile technology and the
implementation of Artificial Intelligence, training has been delivered on this
particular element for operational use from April 2022.
• The rise in demand for electricity charging points as a direct result of the greater
number of electric vehicles and the Scottish Government initiative to ban the sale
of new fossil fuel powered cars and vans from 2040. Work is ongoing on a Pan
Ayrshire EV Infrastructure Project. This initiative aims to enhance access to
convenient and affordable public charging facilities, supporting the transition to EV
ownership in both urban and rural areas.
• The impact of an ageing workforce and the need to ensure an appropriate
knowledge transfer and succession planning; and service re-design. Work around
this was carried out over 21/22 with a greater emphasis on the service being more
resilient with an amended structure to be more community focused along with
Modern Apprenticeships and trainee opportunities.
47

Page 48

21 
Official
In February 2024 approval was given by East Ayrshire for the introduction of a
training programme for road workers so that Ayrshire Roads Alliance could grow
its own, providing full training to school leavers, foundation apprentices, seasonal
workers etc and thereafter, on completion provide a road worker position. In South
Ayrshire one roadworker trainee has progressed to a roadworker position whilst
three Modern Apprentices have progressed onto the roadworker trainee
programme. In the East we have one trainee roadworker at present and in both
areas we have recently appointed another two Modern Apprentices. We have
twelve Community Maintenance Assistants who work between services and over
the last year four former Community Maintenance Assistant have secured
permanent roadworker positions. 
Resilience
• Continue to engage with community councils and community groups to improve
local winter and flooding resilience. This allows these groups to take ownership
of gritting the footpaths and minor roads; and attend minor flooding events and
report them directly to the Alliance for action. The uptake to date has been
encouraging and we currently have 135 groups. This resilience work was
recognised by the National Highways Industry in October 2021 and APSE in March
2022.
• Decreasing requirements for desk and office space due to the increase in
mobilisation of workforce from the developing Roads Asset Management Plan
using the WDM system and working patterns amended due to COVID will see an
increase in ‘hot desking’ and access to welfare facilities at key strategic locations
throughout the geographical area of the Ayrshire Roads Alliance, through service
re-design.
• Improved adverse weather resilience during periods of high winds, heavy rain, and
severe snow conditions.
• Ensuring improved resilience as a measure of our ability to successfully absorb
future changes; to reshape ourselves; and a strategic capability to thrive.
48

Page 49

22 
Official
PROFILE OF SAVINGS AND COSTS OVER THE FIRST 10 YEARS
The Ayrshire Roads Alliance has achieved savings in excess of the £8.634 million
projected by 2024.
This represents a saving on the costs to deliver the service when comparing the first year
with later years. Table 3 has been extracted from the Detailed Business Case, and this
shows the various costs/savings to be delivered. The reason for the variations in year
one to year four is due to set up costs. In practice, these set up costs may be spread
over a longer period to mitigate any operational risks. This may impact on when
consequential savings are realised. 
Continual updates on progress and targets will be contained within the service plan, and
reported to the Joint Committee when required. 
This savings will enable Councils to take individual decisions, either to bank their share
of the savings, or to invest some or all in additional roads maintenance. 
Strategic Delivery Savings for each Council are now calculated by considering a smaller
group of core strategic delivery staff and that their costs are apportioned on a budget
spend profile basis, in line with local delivery budget spend plus the actual capital
expenditure in that specific year. 
Local Delivery Savings are pro rata to the existing budgets. 
Table 3 – Ayrshire Roads Alliance Total Revenue Savings 
Year
1
Year
2
Year
3
Year
4
Year
5
Year
6
Year
7
Year 8 Year 9 Year 10 Total 
14/15 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23/24 
Proposed
Savings
Benefits
realisation(£
m)  0.696  -0.426  -0.730  -1.049  -1.187  -1.188  -1.187  -1.188  -1.187  -1.188  -8.634 
Budget  14.683  14.813  14.006  13.823  13.551  12.695  12.294  11.992  12.278  12.005  132.14
Savings to
date (£m) 0.696 -0.441 -0.971 -1.315 -1.768 -2.515 -3.067 -3.636 -3.828 0.795 -16.05
Cumulative
Budget
14.683 29.496 43.502 57.325 70.876 83.571 95.865 107.857 120.135 132.14 755.45 
Cumulative
Savings to
date (£m) 
0.696  0.255  -0.715  -2.031  -3.799  -6.314  -9.381  -13.017  -16.845  -16.05  -67.201
49

Page 50

23 
Official
The Benefits and Realisation Strategy provided a framework for achieving cumulative
savings of £8.634m between 2014/15 and 2023/24. However, during this time additional
savings have been achieved due to prevailing economic conditions and their impact on
public sector funding. This has resulted in cumulative expenditure reductions of
£67.201m over the life of ARA. This is significantly in excess of the £8.634m originally
envisaged.
The Benefits Realisation Strategy and Plan
• Ensures benefits are identified and also defined at the outset, and appropriately
linked to the East Ayrshire and South Ayrshire Council’s strategic objectives.
• Ensures relevant business areas are prepared to realising their defined benefits.
• Reduces the risk of unrealistic optimism in the Detailed Business Case and
subsequent benefits realisation dilution or delay during or after potential
implementation.
• Drives the process of realising benefits, including benefits measurement, tracking
and recording benefits as they are realised.
• Uses the defined, expected benefits as a roadmap for the programme, providing
a focus for delivering change.
50

Page 51

24 
Official
AYRSHIRE ROADS ALLIANCE IMPROVEMENT ACTION PLAN 2025/26 
Action Success Criteria/
Desired Outcome  Responsible  Timescale  Details
1 Continue to use the integrated
Roads Asset Management
Plan across the Ayrshire
Roads Alliance.
There is one Asset Plan for the
Service delivering a risk based
approach for full service
delivery
Head of Service Completed Document has been presented to Joint
committee and will be reviewed annually.
2 Continue to prepare details for
developing an integrated Local
Transport Strategy.
A Strategy covering both
Council areas, which will
involve consultation with
stakeholders. Information will
be gathered to inform the
future Local Transport
Strategy.
Continue to contribute to the
Scottish National Transport
Strategy, Regional Transport
Strategy and Strategic
Transport Projects Review
work.
Head of Service Ongoing The Regional Transport Strategy, through
SPT, on which the Alliance has Board
membership, has now been published. 
The Local Strategy will be created as an
appendix to the Draft RTS. 
3 Action the Flood Risk
Management Plan
Inform the next national cycle
of potential flood risk
management schemes beyond
2022. 
Complete schemes and
undertake studies.
Head of Service Complete 
March 2026
Reports submitted to both Cabinets Early
2023 
New Cumnock Flood Defences Complete 
Continue Design Work on the Irvine Valley
Continue with flood study works for the river
Ayr, Doon and Girvan
51

Page 52

25 
Official 
Action Success Criteria/
Desired Outcome  Responsible  Timescale  Details
4 Improve the condition of the
road network.
Improve annual roads survey
results which are part of the
SRMCS work. Ensure the
Alliance undertakes more
proactive maintenance.
Head of Service Site works will be
undertaken
throughout
2025/26.
Key dependencies are the Road Improvement
Plans approved by the relevant Committees in
East Ayrshire and South Ayrshire in spring
2025. Progress is provided to members, and
relevant Committees.
5 Ensure the road network
remains safe through raising
awareness and improving road
safety through education,
engineering and enforcement.
Reduce road accidents in line
with government targets.
Provide appropriate traffic
management schemes and
initiatives.
Strategic Manager  March 2026 Scottish Government and SCOTS guidance is
used. A key dependency is the Road
Improvement Plans which are presented to
Cabinet each year.
6 Improve the condition of the
bridge stock.
Improve bridge condition index.
Reduce the number of weight
restricted bridges. Complete
all general, special and
principal bridge inspections.
Strategic Manager March 2026 Through the Road Asset Management Plan.
Key dependencies are Road Improvement
programmes approved by Committees in East
Ayrshire and South Ayrshire in spring 2025.
Deliver the capital and revenue programmes.
7 Manage and improve the
street lighting asset and install
energy efficient lighting
schemes.
Maintain high standard of fixing
dark street lights. Complete
the LED lighting replacement
programme in both East
Ayrshire and South Ayrshire.
Head of Service March 2026 Through the Road Asset Management Plan,
with additional funding being provided to
commence the LED programme.
96% of streets lights are now LED in EAC;
and 100% in SAC. 
8 Maximise and deliver
externally funded sources of
work
Identify external funding
sources and deliver work on
time and on budget. Improve
infrastructure; and contribute to
improving the condition of the
network.
Head of Service Works will be
undertaken
throughout
2025/26.
External sources, including Timber Transport,
Transport Scotland Active Travel
Infrastructure Tier 1 and Tier 2 Funding, SPT,
SUSTRANS Scottish Government, Ayrshire
Growth Deal & Levelling Up Fund
52

Page 53

26 
Official 
Action Success Criteria/
Desired Outcome  Responsible  Timescale  Details      
9 Implementation of Parking
Strategy
Develop Head of Service Works will be
undertaken
through 2025/26
Amendments to TRO’s, lining, signing and
residential parking permits and implementing
an improved process using digital technology. 
10 Prepare Service Plan Publish Head of Service Annual East Ayrshire Council Community Plan. South
Ayrshire - Local Outcomes Improvement Plan
and Local Place Plans. Regular updates will
be provided to joint committee.
11 Continue to review insurance
costs and insurance issues.
Review current practices to
minimise insurance costs.
Head of Service Complete Ayrshire Roads Alliance Monthly Insurance
Report.
There is good dialogue with the Risk &
Insurance to ensure our work improves the
number of repudiated claims. The number of
claims has greatly reduced due to the
implementation of the new Code of Practice. 
12 Review Depots and
Accommodation
Continue to review in 2024/25
from initial work was completed
in 2017 as a result of amended
working practices.
Head of Service Complete Joint Committee Reports of November 2016.
Although initial work has been completed we
continue to strive to make depot and
accommodation cost savings. Further work
will continue on this as a result of COVID and
the return to office space during 2022/23.
13 Review vehicle and plant costs Continue to review in 2021/22
from initial work that was
completed in 2017.
Head of Service March 2026 Joint Committee Reports of June 2016
The service continues to review fleet
requirements with the most recent
improvement being on the management of
vehicle utilisation, electric vehicles and
Telematics.
14 Monitor and exercise Business
Continuity Plans
Improved resilience. Business Support
Manager
Review and
update following
Existing East Ayrshire and South Ayrshire
Council plans
53

Page 54

27 
Official 
Action Success Criteria/
Desired Outcome  Responsible  Timescale  Details    
relevant local and
national events. 
15 Continue to use the Roads
Costing System to its full
potential.
Improve service performance
from both an on-site and
financial perspective.
Business Support
Manager
Ongoing Revised roads costing system was fully
operational from November 2018 and
continues to be used to monitor performance
and work is ongoing to implement digital
timesheets linked to the Roads Costing
System.
16 Support and contribute to the
Ayrshire Growth Deal
Project Management of Roads
Delivery Projects.
Head of Service Ongoing Ayrshire Roads Alliance will assist with the
planning and delivery of the roads enabling
infrastructure requirements to allow the
Ayrshire Growth Deal development to progress.
17 Regional Transport Strategy Successfully contribute to the
preparation of this work being
led by SPT. The Alliance has
Board representation.
Head of Service Complete SPT documents and existing Regional
Transport Strategy
18 Regional Transport Appraisal Ensure the various projects
identified as part of this work
are included in the Strategic
Transport Projects Review.
Head of Service Complete Transport Scotland has published the final
STPR2 with delivery programme to be
published.
19 National Transport Strategy East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure the
sustainable transport hierarchy
and sustainable investment
hierarchy are delivered.
Head of Service Complete In recognition of the anticipated increase in
Active Travel work, it is proposed that a
member of staff is dedicated directly to this
work.
20 National Transport Strategy –
review of Governance
East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
Head of Service Complete National Transport Strategy
54

Page 55

28 
Official 
Action Success Criteria/
Desired Outcome  Responsible  Timescale  Details  
needs of the road
users/communities in both
Council areas.   
21 Transport (Scotland) Bill –
Pavement Parking Ban
East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure a
pragmatic approach is taken in
delivering the pavement
parking ban in both Council
areas.
Head of Service Complete Transport (Scotland) Bill and Transport
Scotland Parking Standards working group -
guidance from Transport Scotland. 
Pavement Parking enforcement commenced
in South Ayrshire with soft approach from 1st
April 2025 and full enforcement from 1st May
2025. Enforcement to commence in East
Ayrshire from 1st June 2025. Exemption
Orders for both authorities to be in place by
end March 2026.
22 Levelling Up Fund East Ayrshire and South
Ayrshire Councils contribute to
this process to ensure that the
outcome/output meets the
needs of the road
users/communities
Head of Service Complete Further updates awaited on future Levelling
Up funding
23   Digital Transformation  Develop modules to deliver end
to end digital processes 
Business
Support
Manager
Ongoing TTRO applications –Implemented
TRIPS – ImplementedTraffic 
Signal permits –   Implemented
Management of external works for EAC &
SAC – Development stage
ASN School Transport – Development stage
55

Page 56

29 
Official
East Ayrshire Council Strategic Priorities 2024/25 
Action  Success Criteria/
Desired Outcome  Responsible  Timescale  Details
1 Progress and complete the
New Cumnock Flood
Protection Project
Complete the flood prevention
projects at the Leggate and
beside the Afton Water.
Head of Service Complete East Ayrshire Council and Scottish Government
funding. The Leggat stage of the works was
completed in August 2018 with the Afton Water
phase commenced May 2021 with an 18 month
contract duration.Contract delayed due to
material shortages.
2 Develop Projects approved
from the Flood Risk
Management Plan
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022.
Head of Service March 2026 The studies for the River Ayr and the Doon are
now fully complete and options being appraised.
The Irvine Valley Flood Study will be updated to
identify options for a potential scheme that is
more likely to attract funding
3 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network and East Ayrshire
Network
Head of Service Complete A full review of active travel provision in East
Ayrshire has been undertaken and this will be
presented to the relevant East Ayrshire Council
Committees.
6 EV Strategy Develop EV strategy across
East Ayrshire Network
Head of Service Complete  Work on concession contract ongoing with
contract award due in September 2025.
7 Levelling Up Fund Completion and Submission of
Bid for improvements to Bellfield
Interchange
Head of Service Complete Design and modelling work to improve Bellfield
to increase capacity and open up [development
opportunities. LUF Bid unsuccessful
8 Ash Die back Strategy Develop a risk based strategy
for the management of Ash Die
Back.
Head of Service Complete Develop a risk based approach to the
management of Ash Die Back.
56

Page 57

30 
Official
South Ayrshire Council Strategic Priorities 2024/25 
Action  Success Criteria/
Desired Outcome 
Responsible  Timescale  Details
1 Implementation of car parking
strategy for South Ayrshire.
Complete this work with
improved parking provision and
management.
Head of Service March 2026 A full review of car parking provision in South
Ayrshire is being undertaken at present and this
will be presented to the relevant South Ayrshire
Council Committees.
2 Develop Projects approved
from the Flood Risk
Management Plan
Progress relevant studies and
inform the developing list of
schemes for cycle two of the
national protection schemes to
be delivered from 2022.
Head of Service Ongoing A Surface Water Management Plan has been
developed for Ayr, Prestwick and Dundonald.
Troon Coastal Flood Study is ongoing.
Pow Burn Prestwick Flood Study has been
scoped and Consultant appointment is ongoing.
3 Support and contribute to the
Ayrshire Growth Deal
Stimulate economic growth and
address inclusive growth
concerns. Contribute to
infrastructure projects which are
being developed through the
Regional Transport Appraisal
work being led by Transport
Scotland.
Head of Service Ongoing Ayrshire Roads Alliance will assist with the
planning and delivery of the roads enabling
infrastructure requirements to allow the Ayrshire
Growth Deal development to progress. 
4 20mph speed restrictions in
villages
Progress with the 20mph speed
restrictions in all villages.
Maintain engagement with the
local communities.
Head of Service Phase 1&2
Complete March
2022
Phase 3 – June 2025
Phase 1 and 2 - complete
Phase 3 - TRO consultation process complete
and approved by Regulatory Panel,
implementation ongoing 
5 Anticipated Budget Reductions
in 2025/26
Continue to provide a high
quality roads service within
decreasing available budgets.
Head of Service March 2026 Reports to various Committees.
57

Page 58

31 
Official
Action Success Criteria/
Desired Outcome
Responsible Timescale Details
6 Active Travel Strategy Develop active strategy for
travel across South Ayrshire
Network
Head of Service Ongoing The Active Travel Strategy will be reviewed and
discussed with the Active Travel Community
Action Group, any amendments will be presented
to the Active Travel Member Officer Working
Group
7 EV Charging Strategy Develop further the EV strategy
for South Ayrshire Network
Head of Service Complete Work on concession contract ongoing with
contract award due in September 2025.
8 Levelling Up Fund Submission of Active Travel bid Head of Service Complete Joint bid with NAC for active travel route Ayr to
Irvine successful.
9 Motorhome Trials Develop Campervan sites along
the coastline.
Head of Service Ongoing Formalisation of two temporary sites at Girvan
and Ayr and additional trials at Ballantrae,
Maidens, Prestwick and Troon.
10 Strategic Economic Impact
Assessment A75/A77
There is a growing desire to
understand the importance /
effectiveness of the
improvements outlined along the
A75 and A77.
Head of Service Complete SEIA complete, ARA to progress STAG for the
A77 or a combined A75/A77 STAG on behalf of
SAC and D&G Council. Lobbying Group formed
with D&G with Task Force the next stage.
11 Ash Die back Strategy Develop a risk based strategy
for the management of Ash Die
Back.
Head of Service Complete Develop a risk based approach to the
management of Ash Die Back.
12 152nd Open Championship Delivery of Event Traffic and
Transport Management
Head of Service Complete Successfully delivered.  Debrief September
2024
13 The International Ayrshow -
Festival Of Flight
Delivery of Event Traffic and
Transport Management
Head of Service Ongoing Successfully delivered in 2024. Debrief
November 2024. Planning in progress for 2025
event.
58

Page 59

32 
Official
APPENDIX 1 – ORGANISATIONAL CHART
Chair 
Joint Committee 
Chief Executive of
South Ayrshire Council
Chief Executive of
East Ayrshire Council
Director of    
Housing,
Operations &
Development
Depute Chief Executive
Strategic Lead: Safer
Communities 
Head of Roads 
2 x Strategic Managers    Strategic Manager 
• Traffic, Parking & Road Safety
• Structures & Flooding
• Piers & Harbours 
• Street Lighting
• Roads Network Mtc
• Winter Mtc & Emergencies 
• Finance & Admin Support
• Business Continuity
• Asset Management & Roadworks
59

Page 60

33 
Official
APPENDIX 2 – STRATEGIC AND LOCAL DELIVERY SPLIT
TABLE 1 - PROPOSED SPLIT BETWEEN STRATEGIC AND LOCAL DELIVERY 
Strategic Service Delivery Local Service Delivery
Asset and Performance
Local Transport Strategy; Transportation Policy;
Road Safety Plan; Cycling Strategy
Council/Partner Liaison;
Transportation, Development Control and
Road Safety
Maintenance of Bus Shelters; Split Cycle
Offset Optimisation Technique (SCOOT)
systems (an adaptive control system for
controlled road crossings); Development
Control; Bus Shelter Advertising;
Shopmobility; Travel Planning; Planning
Applications; Development Planning; Section
75 Agreements; Road Safety Audits; School
Travel Plans; School Crossing Patrol; Road
Safety Education.
Maintenance of Traffic signals, traffic signs,
Traffic Orders; Traffic Counts, Accident
Investigation and Prevention;
Asset and Performance
Asset Management Plan; Performance
Monitoring; Parking Strategy.
Scottish Roadworks Register
Asset, Traffic and Parking Car Park
Maintenance and Parking Enforcement.
Roads Improvement Plan; Infrastructure
Surveys; Inventory Management; Issue of
Permits; Accident Investigation and
Prevention;
Asset and Performance
Flood Risk Management Strategy; Flood Risk
Management Plans;
Design and Environment
Maintenance of Watercourses, Bridges,
Retaining Walls, Piers and Harbours.
Watercourses; Flood Mitigation; Coastal
Protection; Inspection of Piers & Harbours;
Bridge Inspections and Maintenance;
Structural Assessments; Technical Approval;
Abnormal Load Routing; and Design of Major
Road Schemes and Improvements. Road
Construction Consents
Construction and Roads Maintenance
Winter Service Planning; Street Lighting
Management;
Operations
Proactive, Reactive, Cyclic Maintenance of
Roads and Footways; Winter and Weather
Emergency Service; Proactive and Reactive
Maintenance of Streetlights; Electricity costs
for streetlights. Carriageway Inspections;
Programming of Proactive, Reactive and
Cyclic Maintenance; Street Lighting Design;
Festive  Lighting,  Construction  of  Road
Safety Schemes; Design of Minor Road
Schemes.EV Charging.
60

Page 61

Official 
Strategic Service Delivery Local Service Delivery  
Business Operations 
Scottish Roadworkers National Training
Programme
New Business opportunities 
Support Services
HR, Finance, ICT, and Administrative Support. 
TABLE 2 - CURRENT SPLIT BETWEEN STRATEGIC AND LOCAL DELIVERY 
Strategic Service Delivery Local Service Delivery
Transportation, Development Control and
Road Safety
Local Transport Strategy; Transportation Policy;
Road Safety Plan; Travel Planning, Cycling
Strategy; Planning Applications; Road
Construction Consents; Development Planning,
Council/Partner Liaison, Section 75 Agreements;
Road Safety Schemes; Road Safety Audits;
School Travel Plans; School Crossing Patrol; Road
Safety Education.
Transportation, Development Control and
Road Safety
Maintenance of Bus Shelters; Split Cycle
Offset Optimisation Technique (SCOOT)
systems (an adaptive control system for
controlled road crossings); Development
Control; Bus Shelter Advertising;
Shopmobility; Construction of Road Safety
Schemes.
Asset, Traffic and Parking
Asset Management Plan; Roads Improvement
Plan; Infrastructure Surveys; Inventory
Management; Scottish Roadworks Register; Issue
of Permits; Performance Monitoring; Accident
Investigation and Prevention; Traffic Orders;
Traffic Counts; and Parking Strategy.
Asset, Traffic and Parking
Maintenance of Traffic signals, traffic signs,
Car Park Maintenance and Parking
Enforcement.
Design and Environment
Flood Risk Management Strategy; Flood Risk
Management Plans; Watercourses; Flood
Mitigation; Coastal Protection; Inspection of Piers
& Harbours; Bridge Inspections and Maintenance;
Structural Assessments; Technical Approval;
Abnormal Load Routing; and Design of Major and
Minor Road Schemes and Improvements.
Design and Environment
Maintenance of Watercourses, Bridges,
Retaining Walls, Piers and Harbours.
Operations
Carriageway Inspections; Winter Service
Planning; Programming of Proactive, Reactive and
Cyclic Maintenance; Street Lighting Design and
Management; and Festive Lighting.
Operations
Proactive, Reactive, Cyclic Maintenance of
Roads and Footways; Winter and Weather
Emergency Service; Proactive and Reactive
Maintenance of Streetlights; Electricity costs
for streetlights. 
61

Page 62

2021 2022 2023 2024 2021 2022 2023 2024
Number of people killed or seriously injured in
road accidents per 100,000 population 36 42 48 34 37 54 28 54
Number of slightly injured casualties per
100,000 population 49 58 82 57 41 52 30 58
2019/21
2019/21
Scotland
Average
2020/22
2020/22 
Scotland
Average
2021/23
2021/23
Scotland
Average
2022/24
2022/24
Scotland
Average
2023/25
2023/25
Scotland
Average
2019/21
2019/21
Scotland
Average
2020/22
2020/22 
Scotland
Average
2021/23
2021/23
Scotland
Average
2022/24
2022/24
Scotland
Average
2023/25
2023/25
Scotland
Average
% of A Class roads that should be considered
for maintenance 22.10% 29.80% 17.20% 27.60% 15.60% 27.40% 17.60% 28.90% 17.70% 30.60% 34.10% 29.80% 28.90% 27.60% 23.00% 27.40% 21.7% 28.90% 23.4% 30.60%
% of B Class roads that should be considered
for maintenance 32.60% 34.00% 26.85% 33.60% 27.00% 31.50% 26.10% 32.50% 25.20% 34.60% 37.30% 34.00% 34.40% 33.60% 32.50% 31.50% 31.0% 32.50% 28.6% 34.60%
% of C Class roads that should be considered
for maintenance 33.50% 33.60% 29.50% 33.20% 29.60% 32.70% 31.00% 33.40% 30.80% 34.20% 40.80% 33.60% 37.90% 33.20% 38.90% 32.70% 38.1% 33.40% 37.6% 34.20%
% of U Class roads that should be considered
for maintenance 42.30% 38.30% 40.90% 36.70% 40.60% 36.40% 39.00% 36.20% 37.00% 36.20% 43.40% 38.30% 42.90% 36.70% 41.00% 36.40% 38.5% 36.20% 36.4% 36.20%
Overall % of the road network that should be
considered for maintenance 36.80% 35.50% 33.80% 34.20% 33.50% 33.60% 33.00% 34.10% 31.70% 34.70% 40.90% 35.50% 39.00% 34.20% 37.40% 33.60% 35.5% 34.10% 34.0% 34.70%
MONTHLY PERFORMANCE INDICATORS
APSE
Average
2024/25
Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
No of invoices paid within 30 days 904 886 781 491 521             979 320 1052 1,141 387          1,002            1,237       
No of Invoices Received 907 889 785 494 534             1000 321 1,112 1,178 391          1,029            1,328       
Average Year to date of Number of Invoices
paid within 30 days 100% 100% 99% 99% 98% 98% 100% 95% 97% 99% 97% 93%
Number of ARA Safety Inspections Completed
within Timescale 25 27 21 22 23 20 17 20 6 14 21 16
Number of ARA Safety Inspections Scheduled 25 28 23 23 23 20 17 21 7 16 21 18
% of ARA Safety Inspections Completed within
timescale 100% 96% 93% 96% 100% 100% 100% 95% 85% 88% 100% 89%
Number of Health and Safety Incidents
Reported to the Health and Safety Section 3 4 2 5 3 8 7 7 4 7 2 4
Average Number of days to report an incident to
the Health and Safety Section 1 1 1.5 1.8 2.3 1.6 9.6 2.9 1.8 3.1 3 10.3
Average days lost per employee - - 0.82 0.94 1..06 1.07 0.85 1.19 0.65 1,19 1.19 1.18 1.12 1.43
Visits to the ARA Website every month - 49,000 per
annum  11,906 10,379 9,806 11,231 12,843 11,313 12,657 11,379 7,719 13,494 11,891 6,394
No of Twitter Followers every month - - - 4,676 4,590 4,600 4,605 4,603 4,619 4,620 4,590 4,574 4,528 4,543            4,576
Monthly visits to the website from social media - 1,800 per
annum          1,066 827 792        1,377 1560 1261              1,001 1031 843        6,725 6891 4545
-
92.02%
Comments
AYRSHIRE ROADS ALLIANCE PERFORMANCE SCORECARD DETAILED MONITORING REPORT
ANNUAL REPORT 2024 / 25
ANNUAL PERFORMANCE INDICATORS                                                                                              
(FINANCIAL YEAR)
ANNUAL PERFORMANCE INDICATORS
(CALENDAR YEAR)
HEALTH AND SAFETY
98% -
WELL ENGAGED
90%
5
South AyrshireEast Ayrshire
AYRSHIRE ROADS ALLIANCE
East Ayrshire Council South Ayrshire Council
AYRSHIRE ROADS ALLIANCE
FINANCE
ABSENCE MONITORING
62

Page 63

Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
Number of parking appeals accepted 39 40 32 55 47 47 56 45 33 37 32 38 96 101 93 70 51 61 101 106 62 39 23 22
Number of parking appeals received 102 111 127 135 123 133 128 110 70 121 115 129 199 206 223 173 134 223 233 268 191 210 166 206
% of parking appeals accepted 38% 36% 25% 41% 38% 35% 44% 41% 47% 31% 28% 29% 48% 49% 42% 40% 38% 27% 43% 40% 32% 19% 14% 11%
Physical % of Roadworks Programme
Completed - 100% 17% 32% 46% 54% 71% 83% 97% 97% 97% 97% 98% 100% 100% 13% 38% 43% 65% 81% 89% 96% 97% 98% 98% 99% 100%
Number of General Bridge Inspections - 408 0 0 0 61 0 0 16 41 20 28 15 47 257 21 47 37 26 26 17 0 44 10 10 33 45
Number of Special Bridge Inspections - 408 7 7 7 7 7 61 7 61 7 61 7 91 150 30 5 30 0 5 30 28 5 28 5 28 5
Number of Principal Bridge Inspections - 88 0 0 0 0 0 0 0 0 0 0 0 61 56 13 0 0 0 0 0 0 0 0 10 13 14
Number of Category 1 Road Emergency defect
repairs made safe within 2 hours 1 2 2 0 1 0 1 1 3 5 0 1 2 2 1 1 2 0 3 1 1 0 2 1
Number of Category 1 Repair Lines issued 1 2 2 0 1 0 1 1 3 5 0 1 2 2 1 1 2 0 3 1 1 0 2 1
% of Category 1 Road Emergency defect repairs
made safe within 2 hours 100% 100% 100% - 100% - 100% 100% 100% 100% - 100% 100% 100% 100% 100% 100% - 100% 100% 100% - 100% 100%
Number of Category 2 Road Emergency defect
repairs made safe within 5 working days 16 14 15 18 14 9 5 8 10 21 15 11 16 13 12 13 25 11 11 10 12 9 29 11
Number of Category 2 Repair Lines issued 22 16 15 18 15 10 8 8 11 24 16 13 17 13 12 14 26 12 11 10 12 14 35 16
% of Carriageway Category 2 Defects repaired
within 5 working days 73% 88% 100% 100% 93% 90% 63% 100% 91% 88% 94% 85% 94% 100% 100% 93% 96% 92% 100% 100% 100% 64% 83% 69%
Number of Street Lighting repairs completed
within 7 working days 72 49 33 69 92 79 123 94 97 126 98 75 39 33 31 35 49 51 76 97 57 93 75 64
Number of Street Lighting Repair Lines Issued 72 49 33 69 95 81 123 99 100 128 99 78 40 38 33 35 49 54 76 105 60 94 76 64
% Street Lighting repairs completed within 7
working days 100% 100% 100% 100% 97% 98% 100% 95% 97% 98% 99% 96% 98% 87% 94% 100% 100% 94% 100% 92% 95% 99% 99% 100%
Number of Traffic light repairs completed within
48 hours 28 26 22 30 24 17 28 39 28 40 29 24 39 31 24 16 14 18 18 21 31 11 12 19
Number of Traffic light repair lines issued 29 26 23 30 25 17 28 40 28 40 29 24 40 31 24 16 15 18 18 21 32 13 12 20
% of Traffic light repairs completed within 48
hours 97% 100% 96% 100% 96% 100% 100% 98% 100% 100% 100% 100% 98% 100% 100% 100% 94% 100% 100% 100% 97% 85% 100% 95%
Number of Stage 1 Complaints responded to
within allotted timescales 2 2 1 0 5 0 - 1 0 0 1 2 2 0 0 2 1 1 1 4 1 1 0 1
Numer of Stage 1 Complaints received 2 2 1 0 5 0 0 1 0 0 1 2 2 0 0 2 1 1 1 4 1 1 0 3
% of Stage 1 Complaints responded to within
allotted timescales 100% 100% 100% - 100% - - 100% - - 100% 100% 100% - - 100% 100% 100% 100% 100% 100% 100% - 66%
Number of Stage 2 complaints responded to
within allotted timescales 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 1 0 0 1 0 0 0 1 1
Number of Stage 2 complaints received 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 1 0 0 1 0 0 0 1 1
% of Stage 2 complaints responded to within
allotted timescales - - - - - - - - - - - 100% - - - 100% - - 100% - - - 100% 100%
APSE
Average
2024/25
75%
PRIORITY 2 DEFECTS
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
76.23%
95%
TRAFFIC
ROADWORKS PROGRAMME
STREET LIGHTING
100%
-
100%
COMPLAINTS
95%
Comments
-
91.20%
Due to sickness and a
vacancy within the EAC
team, the target was not
achieved for General
Inspections.  The post has
now been filled and the team
will endeavour to complete
the remaining general
inspections over the next few
months
75%
88.07%
95%88.23%
- 100%
PRIORITY 1 DEFECTS
100%
50% 50%
95%
BRIDGES
-
PARKING
MONTHLY PERFORMANCE INDICATORS
- -
-
63

Page 64

Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 Target Current
Status P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12
APSE
Average
2024/25
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
Comments
MONTHLY PERFORMANCE INDICATORS
Number of enquiries responded to within
allotted timescales 77 85 73 53 43 42 60 58 49 41 62 48 39 41 39 34 31 39 53 48 31 29 26 31
Number of enquiries received 78 91 79 54 45 46 62 64 53 50 66 51 47 45 41 35 34 42 54 51 33 33 30 35
% of enquiries responded to within allotted
timescales 99% 93% 92% 98% 96% 91% 97% 91% 92% 82% 94% 94% 83% 91% 95% 97% 91% 93% 98% 94% 94% 88% 87% 89%
Number of FOI & EIR requests responded to
within 20 working days 17 17 5 13 20 4 12 18 17 11 22 20 24 14 11 13 22 15 26 22 16 18 21 27
Number of FOI & EIR requests received 17 17 5 13 21 4 12 18 17 11 22 20 24 14 11 13 22 15 26 22 16 18 21 30
% of FOI & EIR requests responded to within 20
working days 100% 100% 100% 3% 95% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 90%
Number of Public Liability claims closed 11 12 5 10 3 3 7 2 5 4 4 4 12 6 2 10 3 2 5 2 2 2 3 7
Number of Public Liability claims received 13 13 6 3 1 2 2 1 3 11 3 15 14 8 4 2 0 2 4 2 3 8 2 17
Total number of open claims 70 53 48 46 35 37 46 38 40 50 42 72 46 20 21 26 30 32 37 34 37 44 39 52
Number of Public Liability Claims that were
successful 0 0 0 1 0 0 0 0 0 0 0 1 0 0 1 1 0 0 0 0 0 0 0 0
- - - - -
83.44% 80%
PUBLIC LIABILITY CLAIMS
FREEDOM OF INFORMATION
ENQUIRIES
80%
100%88.52% 100%
64

Page 65

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
6 June 2025 
Report by the Head of Roads – Ayrshire Roads Alliance 
AYRSHIRE ROADS ALLIANCE
PERFORMANCE SCORECARD 
Purpose of report 
1. The purpose of this Report is to advise the Joint Committee regarding the
progress made to date against the Performance Scorecard.  
Recommendations 
2  It is recommended that the Joint Committee:
i. Notes the performance scorecard presented in this report;
ii. Continues to receive the performance scorecard updates; and
iii.  Otherwise, notes the content of the report. 
Background 
3.    The purpose of the performance management and benchmarking is to work
collaboratively to deliver tangible and sustained improvements within the
Ayrshire Roads Alliance in order to manage the on-going development and
delivery of benchmarking frameworks. 
4. Improved performance management is fundamental to supporting the Ayrshire
Roads Alliance.  This drives change and improvement within the fully integrated
roads service and support improved outcomes, better performance, and more
effective use of resources.   
5.      The Performance Indicators are regularly refreshed when new useful performance
measures are introduced by the Ayrshire Roads Alliance or there is an
agreement to include a specific indicator.  This will be a regular item for the
Ayrshire Shared Service Joint Committee to review 
Main report/main issues 
6.       This scorecard is used to: 
• monitor the progress in meeting the Ayrshire Roads Alliance’s objectives;
• help managers to have performance-related conversations with staff; and 
• identify any problem areas that need addressed.
Agenda Item 5
65

Page 66

7. Some indicators are collated at different frequencies and so these will be
included as appropriate. 
8. The Performance Scorecard is presented in Appendix 1.  Commentary against
the specific red and amber performance measures are included in Appendix 1.
There are a number of green performance measures which should be
highlighted, especially: 
• Finance with respect to the percentage of invoices paid within 30 calendar
days.  This is currently at 99% for the financial year. 
• Priority 1 and Priority 2 Faults – with respect to the percentage of priority 1
and 2 faults completed within timescale.  This is currently above target for
the financial year. 
• Street Lighting Repairs – with respect to the percentage of street lighting
repairs completed within the timescale.  The service has achieved an
average of 98% for the financial year. 
• Traffic Light Repairs – with respect to the percentage of traffic light repairs
completed within the timescale.  The service has achieved an average of
99% for the financial year. 
9. The Process Improvement and Integration Plan continues to identify
improvements to a number of existing processes for re-design within The
Ayrshire Roads Alliance. 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning Yes  10 and 11
2. Governance Yes  12
3. Human Resources Yes  13
4. Equality and Fairer Scotland Duty Yes   14
5. Financial Yes  15
6. Risk Yes  16
7. Community Wealth Building Yes  17
8. Net Zero Yes  18 
Policy/strategic planning implications 
10.      A well-maintained road network will contribute to achieving the 2015-2030 
Community Plan objectives and associated 2024-2027 Delivery Plans 
11.      The matters referred to in this report contribute to Priority 1 of the South Ayrshire       
Council Plan: Spaces and Places/ Moving around and the environment       
(Outcome 1). 
66

Page 67

Governance Implications 
12. The work of the Ayrshire Roads Alliance is undertaken in accordance with 
relevant legislation. 
Humans resources Implications 
13.     The Performance Scorecard has no direct impact on human resources. 
Equality impact and Fairer Scotland duty implications 
14. The Performance Scorecard complements the Equality Impact Assessment by     
ensuring that any issues arising are adequately prioritised, managed and either
eliminated or mitigated. 
Financial implications 
15.   The Performance Scorecard facilitates the existing scrutiny arrangements to
manage, prioritise, and review the budget provided by East Ayrshire Council and
South Ayrshire Council to the Ayrshire Roads Alliance. 
Risk implications 
16.    The Performance Scorecard assists in the prioritisation of risks that need to be 
mitigated by the Ayrshire Roads Alliance in order to reduce the overall risk to
either Council  and to comply with the Community Plan/Council Plan in both
partner bodies. 
Community Wealth Building implications 
17. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people 
Net zero implications 
18.   The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
67

Page 68

Appendices (if applicable) 
1. Performance Scorecard 
Background papers 
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
68

Page 69

2019/21 2019/21
Scotland 2020/22 2020/22 
Scotland 2021/23 2021/23
Scotland 2022/24 2022/24
Scotland 2023/25 2023/25
Scotland 2019/21 2019/21
Scotland 2020/22 2020/22 
Scotland 2021/23 2021/23
Scotland
` % of A Class roads that should be considered
for maintenance 22.10% 29.80% 17.20% 27.60% 15.60% 27.40% 17.60% 28.90% 17.70% 30.60% 34.10% 29.80% 28.90% 27.60% 23.00% 27.40%
2021 2022 2023 2024 2021 2022 2023 2024 % of B Class roads that should be considered
for maintenance 32.60% 34.00% 26.85% 33.60% 27.00% 31.50% 26.10% 32.50% 25.20% 34.60% 37.30% 34.00% 34.40% 33.60% 32.50% 31.50%
Number of people killed or seriously injured in road
accidents per 100,000 population 36 42 48 34 37 54 28 54 % of C Class roads that should be considered
for maintenance 33.50% 33.60% 29.50% 33.20% 29.60% 32.70% 31.00% 33.40% 30.80% 34.20% 40.80% 33.60% 37.90% 33.20% 38.90% 32.70%
Number of slightly injured casualties per 100,000
population 49 58 82 57 41 52 30 58 % of U Class roads that should be considered
for maintenance 42.30% 38.30% 40.90% 36.70% 40.60% 36.40% 39.00% 36.20% 37.00% 36.20% 43.40% 38.30% 42.90% 36.70% 41.00% 36.40%
Overall % of the road network that should be
considered for maintenance 36.80% 35.50% 33.80% 34.20% 33.50% 33.60% 33.00% 34.10% 31.70% 34.70% 40.90% 35.50% 39.00% 34.20% 37.40% 33.60%
MONTHLY PERFORMANCE INDICATORS APSE
Average Target Current
Status Apr MONTHLY PERFORMANCE INDICATORS APSE
Average Target Current
Status Apr Comments
No of invoices paid within 30 days 333 Average days lost per employee - - 1.43
No of Invoices Received 341
% of invoices paid within 30 days 98% Visits to the ARA Website every month - 49,000 per
annum  1,751
Average Year to date of Number of Invoices paid
within 30 days 98% No of Twitter Followers every month -  4,576
Monthly visits to the website from social
media - 1,800 per
annum             140
Number of ARA Safety Inspections Completed within
Timescale 25
Number of ARA Safety Inspections Scheduled 25
% of ARA Safety Inspections Completed within
timescale 100%
Average Number of days to report an incident to the
Health and Safety Section 1.5
Target Current
Status Apr Target Current
Status Apr Target Current
Status Apr Target Current
Status Apr
Number of Public Liability claims closed 5 10
Number of Public Liability claims received 6 7
Total number of open claims 57 65
Number of Public Liability Claims that were
successful 0 0
% of Public Liability Claims that were successful 0% 0% Number of Principal Bridge Inspections - 0 0  9
Number of Priority 1 Road Emergency defect repairs
made safe within 2 hours 0 3 Number of Street Lighting repairs completed
within 7 working days 53 50
Number of Priority 1 Repair Lines issued 0 3 Number of Street Lighting Repair Lines Issued 54 50
100%
-
75%
- -
ANNUAL PERFORMANCE INDICATORS
(CALENDAR YEAR) East Ayrshire South Ayrshire
AYRSHIRE ROADS ALLIANCE
ANNUAL PERFORMANCE INDICATORS                                                                                              
(FINANCIAL YEAR)
-
95%
- 
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
APSE
Average MONTHLY PERFORMANCE INDICATORS
FINANCE
98% -
AYRSHIRE ROADS ALLIANCE
Comments
HEALTH AND SAFETY
92.02%
EAST AYRSHIRE COUNCIL
MONTHLY PERFORMANCE INDICATORS APSE
Average
100%
75%
-
91.20%
Number of staff who have received annual
FACETIME review 2 0
-
Comments
1%
ROADWORKS PROGRAMME
BRIDGES
Physical % of Roadworks Programme
Completed 100% 20%
7 27
WELL ENGAGED
20 
- 100% 
40
Number of General Bridge Inspections 50 36
Number of Special Bridge Inspections -
ABSENCE MONITORING
AYRSHIRE ROADS ALLIANCE
East Ayrshire Council South Ayrshire Cou
AYRSHIRE ROADS ALLIANCE PERFORMANCE SCORECARD DETAILED MONITORING REPORT
UPDATE : JOINT COMMITTEE  - 6 JUNE 2025
Comments
SOUTH AYRSHIRE COUNCIL
FACETIME
Managers are
aware of the
importance of
completing
FACE reviews
PUBLIC LIABILITY CLAIMS
PRIORITY 1 FAULTS STREET LIGHTING
95%88%
69

Page 70

Target Current
Status Apr Target Current
Status Apr Target Current
Status Apr Target Current
Status Apr
EAST AYRSHIRE COUNCIL SOUTH AYRSHIRE COUNCIL
APSE
Average MONTHLY PERFORMANCE INDICATORS
EAST AYRSHIRE COUNCIL
MONTHLY PERFORMANCE INDICATORS APSE
Average CommentsComments
SOUTH AYRSHIRE COUNCIL
% of Priority 1 Road Emergency defect repairs made
safe within 2 hours - 100% % Street Lighting repairs completed within 7
working days 98% 100%
Number of Priority 2 Road Emergency defect repairs
made safe within 5 working days 8 20 Number of Traffic light repairs completed
within 48 hours 26 22
Number of Priority 2 Repair Lines issued 10 21 Number of Traffic light repair lines issued 26 23
% of Carriageway Priority 2 Defects repaired within 5
working days 80% 95% % of Traffic light repairs completed within 48
hours 100% 96%
Number of Stage 1 Complaints responded to within
allotted timescales 0 0 Number of enquiries responded to within
allotted timescales 88 52
Numer of Stage 1 Complaints received 0 0 Number of enquiries received 90 55
% of Stage 1 Complaints responded to within
allotted timescales - - % of enquiries responded to within allotted
timescales 98% 95%
Number of Stage 2 complaints responded to within
allotted timescales - 0 1
Number of Stage 2 complaints received 0 1 Number of FOI & EIR requests responded to
within 20 working days 28 25
% of Stage 2 complaints responded to within allotted
timescales - 100% Number of FOI & EIR requests received 28 25
% of FOI & EIR requests responded to within
20 working days 100% 100%
Number of parking appeals accepted 30 62
Number of parking appeals received 99 182
% of parking appeals accepted 30% 34%
- ----
100% 100%
- 100%100%
76.23%
88.52% 100% 100%
88.23% 95% 95%
80%
FREEDOM OF INFORMATION
50% 50%
Officers are reminded
of the importance of
responding to
enquiries within
timescales
80%
COMPLAINTS
PARKING
PRIORITY 2 FAULTS TRAFFIC LIGHTS
ENQUIRIES
83.44%
70

Page 71

AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
6 June 2025 
Report by the Head of Roads – Ayrshire Roads Alliance 
AYRSHIRE ROADS ALLIANCE RISK REPORT AND REGISTER 
Purpose of report 
1. The purpose of this Report is to advise the Joint Committee on the management
of risk associated with the Ayrshire Roads Alliance. 
Recommendations 
2 It is recommended that the Joint Committee:
i. Notes the risk register presented in this report;
ii. Continues to receive updates on progress; and
iii.  Otherwise, notes the content of the report. 
Background
3 A report detailing the general approach to the Risk Report and Risk Register was
presented to the Joint Committee on 21 August 2014, where it was agreed that
the Risk Report and Risk Register would be a standing item on the agenda.  This
would ensure that the risks are monitored and scrutinised at a minimum on a
quarterly basis.     
Main report/main issues 
4 The management of risk aims to enable confident decision taking on risk,
innovation, reduce waste and inefficiency, and lead to fewer unanticipated
problems and crises that could undermine the performance and operation of the
Ayrshire Roads Alliance.
5 The risk register is contained in Appendix 1.  
Since the last Joint Committee, there have been 4 risks added to the risk register
and no risks removed.  The three risks added are: 
Risk Number 4c: Adverse Weather - Damage to Salt Storage (Dome)
Risk number 42:  Land Acquisition and other Legal Resource Requirement -
Lack of available resources resulting in delays to projects
Risk number 43: Procurement – Scotland Excel Framework Contract delays
Risk number 44: United States Trade Agreement - market cost increase of
raw material affecting suppliers, supply chains, shipping,
transportation and Construction costs.
Agenda Item 6
71

Page 72

The revised risk register illustrates the red, amber and green status and also   
illustrates whether the risk severity relates to time, indicated by [T] or cost,
indicated by [C]. 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning Yes  6 and 7
2. Governance Yes  8
3. Human Resources Yes  9
4. Equality and Fairer Scotland Duty Yes  10
5. Financial Yes  11
6. Risk Yes  12
7. Community Wealth Building Yes  13
8. Net Zero Yes  14 
Policy/strategic planning implications 
6.  A well maintained road network will contribute to achieving the Community Plan
objectives in relation to Economy & Skills and Safer Communities to maintain
good access to our communities within East Ayrshire. 
7. The matters referred to in this report contribute to South Ayrshire Council
strategic objective of ‘Enhanced Environment through Social, Cultural and
Economic Activities’ and within that to the outcome ‘Work with partners to
improve roads and other infrastructure, to encourage house building and
business investment that sustains local communities’. 
Governance Implications 
8. The work of the Ayrshire Roads Alliance is undertaken in accordance with
relevant legislation.             
Humans resources Implications 
9.       The Risk Register has no direct impact on human resources. 
Equality impact and Fairer Scotland duty implications 
10. The Risk Register complements the Equality Impact Assessment by ensuring
that any issues arising are adequately prioritised, managed and either eliminated
or mitigated. 
72

Page 73

Financial implications 
11.     The Risk Register facilitates the existing scrutiny arrangements to manage,   
prioritise and review the budget provided by East Ayrshire Council and South
Ayrshire Council to the Ayrshire Roads Alliance.           
Risk implications 
12.     The Risk Register assists in the prioritisation of risks that need to be mitigated by       
the Ayrshire Roads Alliance in order to reduce the overall risk to either Council       
and to comply with the Community Plan/Council Plan in both partner bodies. 
Community Wealth Building implications 
13. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people 
Net zero implications 
14.   The Ayrshire Roads Alliance Service Plan supports and links to East Ayrshire
Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
73

Page 74

Appendices (if applicable) 
1. Ayrshire Roads Alliance Risk Register 
Background papers 
None 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail: jane.corrie@ayrshireroadsalliance.org 
74

Page 75

Appendix 1: Risk Register Scoring Matrix 
The Risk Matrix for deciding each of the risk factors (Likelihood x Severity) in a 5 by 5
matrix are illustrated in Table 1 below: 
Table 1: Risk Factors in Practical Form 
Rare (1) Unlikely
(2)
Possible
(3)
Likely
(4)
Almost
Certain
(5)
Catastrophic
(5) 5 10 15 20 25
Very Serious
(4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Insignificant
(1) 1 2 3 4 5
Risk Likelihood
Risk Severity
Following on from Table 1, the following Summary Risk Profile is colour coded to highlight
the risk classification: 
Table 2: Summary Risk Profile 
Assessed
Risk (LxS) Action Required
Low Risk: 
1 to 4 
Acceptable/ can be accepted provided risk is
managed.
Medium Risk: 
5 to 12
Undesirable/ must be avoided if reasonably
practicable.
High Risk: 15
to 25 
Unacceptable risk - must be eliminated or moved to
a lower level. 
75

Page 76

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official 
NOTE:
The Risk rating will be influenced by considering a combination of event effects
Such as associated cost, event duration, and organisational reputation.   
The table below will provide some assistance with risk rating. 
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
1  
a) 
b) 
Personnel Shortage
due to:
• Pandemic
Event 
• Resignation
• Retirement
• Strike Action
• Driver hour
restrictions
Loss of trained and
competent personnel from
all sections within ARA 
Business continuity plans in place
(BUS-12, 13, & 14) to manage all
ARA mission critical activities.       . 
Additional usage of external
contractors to ensure essential
services / works programme targets
are met.   Pandemic safe workplaces
/ sites established to accommodate
reduced number of staff 
Procedures are in place to manage a
short / medium disruption of
Technical / Supervisory / operational
Personnel including re-assignment of
duties and controlled overtime
working as required.  Over long term
there would be recruitment /
procurement of the necessary
experience to fill the gaps. 
3 4  12 [T]
All Service
Managers 
Head of Roads
– Ayrshire
Roads Alliance
The staff numbers are
reviewed whenever there are
significant changes in staffing
level.  The Ayrshire Roads
Alliance has Modern
Apprentices who are
providing a strong foundation
for future staffing levels as an
addition, The Ayrshire Roads
Alliance has appointed a
Training Officer who will
undertake refresher training
to the existing workforce
where skill gaps have been
identified.  Furthermore, the
Training Officer will develop
and enhance the skills and
competency with our MAs
and trainee road workers. 
19/5/25
2  Fuel Shortage Loss or restriction due to
relief events. Any event
that has an effect on the
cost of performing the
Services, or the date of
their completion, including
the occurrence of risks
both foreseen and
unforeseen e.g. industrial
action.
To mitigate the impact of losing
access or having a restricted access
to fuel, a contingency plan has been
established which sets out the
emergency management actions that
will be taken that include designated
fuelling stations and the prioritisation
of fleet, putting non-essential
vehicles off the road. 
3 3  9 [T]
Strategic
Manager
Head of Roads
– Ayrshire
Roads Alliance
Continuation of public
support will be dependent on
outcomes, though expect
some mixed reaction 
19/5/25 
To calculate the risk rating, multiply the 
Likelihood x Severity.    Example….   
Possible (3) X Significant (3) = Medium Risk 
Critical (5) 
Severe (4) 
Significant (3) 
Marginal (2) 
Insignificant  (1)      
SEVERITY INDEX 
LIKELIHOOD
INDEX 
Highly probable (5) 25 20 15 10 5
Probable (4) 20 16 12 8 4
Possible (3) 15 12 9 6 3
Unlikely (2) 10 8 6 4 2
Very Unlikely (1) 5 4 3 2 1 
Incident Severity Cost (£) [C] Time [T] Reputation
Min Max Min Max 
Insignificant (1) £0 £10,000 0 1 day Councillors/CEO
Marginal (2) £10,001 £50,000 1 day 2 weeks Local Media Facebook etc.
Significant (3) £50,001 £500,000 2 weeks 1 month Local Newspaper
Severe (4) £500,001 £1,000,000 1 month 3 months National Newspaper
Catastrophic (5) £1,000,001  >£1,000,001 3 months     > 6 months National News (TV)
KEY
High Risk (16 – 25) Risks are not acceptable under any circumstances. Immediate action required
Medium Risk (8 – 15) Additional controls measures may be required.
Low Risk (1 – 6) Continue to monitor as part of review process or where changes occur.
76

Page 77

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
3  Failure to align with
Budget
requirements 
Level of investment
required in road repairs
and resurfacing and
resulting cost of treatment
higher than anticipated. 
Reduced budget could
lead to the deterioration in
the roads network, an
increase in accidents, and
insurance costs.
Loss of parking income as
a result of policy changes.
Appropriate financial and
performance monitoring
arrangements in place to mitigate the
risk.  Regular meetings with and
within partners Councils to advice on
further resource and funding
requirements. 
2 4  8 [C]
Business
Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
Adequate control measures
are in place, specifically,
monthly meetings held with
budget holders to review
revenue budget and take
appropriate corrective
actions to bring budgets
within tolerance limits. 
Monthly meeting with service
managers to review capital
budgets and programmes. 
19/5/25
4
a) 
b) 
C) 
Adverse Weather 
Staffing Issues 
Salt 
Damage to salt
storage (Dome) 
Lack of trained and
competent personnel
including operatives and
drivers to provide full
complement required to
fulfil all gritting routes due
to lack of volunteers for
existing staff, flu
pandemic, mass
resignation, strike action
and breach of Working
Time Directive and Driver
Hours Legislation. 
Reduction and /or loss of
salt stock materials for
Winter Service
operations. 
Reduction and /or loss of
salt stock materials for
Winter Service
operations. 
Procedures in place to manage a
short / medium disruption of Driver /
Operative Personnel including
banking workers and overtime
working as required.  Over the long
term there would be recruitment /
procurement of the necessary
experience to fill the gaps. 
There is adequate salt stock
resilience and conservation control
measures.  Transport Scotland has
strategic salt stock piles. 
Areas identified within depot to stock
pile storage.  Transfer salt to
alternative depots. 
2 4  8 [C]  Strategic
Manager 
Head of Roads
– Ayrshire
Roads Alliance 
Rolling programme
established to ensure
ongoing Health and Safety
training.  Appropriate and
applicable checks are
conducted on all new drivers
to ensure that all reasonable
precautions are taken to
safeguard the ‘O’ licence,
insurance payments and
reputation.  The service has
extended the use of external
companies to provide the
winter service to increase
resilience
The Service has a framework
salt supplier with a 14 day
call down delivery.  There is
a joint agreement with other
Councils to share available
salt stocks.  The existing
weather service provides
long term forecast indicating
extreme and prolonged
weather conditions. 
Cover salt exposed to the
environmental elements. 
19/5/25
5  Loss of Street
Lighting & Traffic
Signals
Extended loss of Public
Electricity supply creating
issues with Street Lighting
and Traffic Signals
Some temporary traffic signals will be
provided at key locations determined
by the Traffic Management Section
should these issues arise. 
Temporary traffic signals deployed by
RMU.  Contingency measures 
3 3  9 [T]  Traffic & Road
Safety Manager
Head of Roads
– Ayrshire
Roads Alliance
We consider that the overall
risk is low due to the
mitigation measures that are 
in place 
19/5/25
77

Page 78

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
detailed in Business Continuity
Plans.
6 Transfer of Shared
Services – Ayrshire
Roads Alliance
Any failure in Service
provision would adversely
affect the resilience of the
Roads services.
Extensive negotiations have taken
place to ensure that the proposed
joint service meets stakeholders
needs 
2 2  4 [T]
Business Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
The new service is over ten
years old and it is considered
that the initial transfer of the
shared service has been
completed.  Nevertheless
there will always remain
issues on transfer issues
which may still arise. 
19/5/25
7 Council’s Waste
Transfer Licence
Loss off / restrictions on
waste transfer licence for
all depots
Robust management systems and
procedures in place to comply with
Environmental legislation, permit
conditions and health and safety 
2 3  6 [T]
Strategic
Manager
Head of Roads
– Ayrshire
Roads Alliance
We consider the overall risk
is low, due to the current
waste management systems
in operation.  Current
contract allows 
19/5/25
8 Council’s Operators
Licence (‘O’
Licence) - 
Loss off / restrictions on
Council’s ‘O’ Licence.
A comprehensive maintenance
regime has been established that
follows all guidance from DVSA and
the Traffic Commissioner to ensure
that the O-Licence is protected.
In addition, compliance activities are
established and in place and a
regular external audit is carried out
by the Freight Transport Association
every 2 years to ensure that all
processes are performing to the
required standard. 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Continue to work with fleet
service in East Ayrshire
Council.  19/5/25
9 Failure to meet
statutory duties in
relation to Road
Safety Inspections
Failure to provide a Risk
based approach and 
Inspection System in
accordance with the
approved, Inspection
Manual: Road Safety
Inspections and defect
categorisations.in
accordance with the Well-
Managed Highway
Infrastructure:
A Code of Practice.
There are procedures in place to
manage this process: 
1. Short term by prioritising and
reducing other works activities
and realigning budgets;
2. Medium / long term there would
be a request for additional
budgets;
3. Operatives can be assigned from
other duties and overtime
working approved. 
2 4  8 [T]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Following implementation of
the  Inspection Manual: Road
Safety Inspections and
defect categorisations from
1st April 2019 in accordance
with the Well-Managed
Highway Infrastructure:
A Code of Practice the
Ayrshire Roads Alliance 
a) Inspects the entire road
network within East
Ayrshire and South
Ayrshire, with
performance in relation
to the percentage of
safety inspections carried
out within the timescale
being reported to the
Joint Committee under
the Performance
Scorecard standing item
on the agenda. 
b) Categorise defects in
accordance with a risk
based approach ranking
defects one to four as 
19/5/25
78

Page 79

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
detailed in the Inspection
Manual: Road Safety
Inspections and defect
categorisations 
c) Issue repair lines for
defects on carriageways
and footways with target
response times
determined by the
category of defect, as
identified in the
Inspection Manual: Road
Safety Inspections and
defect categorisations 
d) Complete the vast
majority of Category 1
defects within the target
response time of two
hours.
10 Business Continuity
/ Emergency
Planning
Incident affecting one or
more of the Ayrshire
Roads Alliance service
functions (including ICT
Failure).
Business continuity plans developed
for: Roads Maintenance (including
the Winter Gritting Programme);
Lighting Maintenance Unit; Network;
Design and Traffic and Road Safety
facilities within East Ayrshire and
South Ayrshire.
To prevent fallout from IT system
failure, a business contingency plan
has been developed as well as a
back up process to revert to paper
based recording systems for fleet
management and maintenance. 
2 4  8 [T]
Business Support
Manager
Head of Roads
– Ayrshire
Roads Alliance
The overall risk is high due to
the unknown nature of such
an incident and because of
the potential reputational
damage and adverse effect
on the service delivery,
including discharge of
statutory responsibilities. 
19/5/25
11 Benefits Realisation Ayrshire Roads Alliance
does not deliver the
expected benefits outlined
in the Detailed Business
Case of June 2013. 
Benefit Realisation Plan to track the
delivery of each benefit and take
corrective action where appropriate it
has been developed. 
A 10 year Service Review is due tol
be completed within the next couple
of years. 
2 3  6 [C] 
Service Managers Head of Roads
– Ayrshire
Roads Alliance
The overall risk is medium
due to the various reviews
outlined in the Benefits
Realisation Strategy and
Plan now progressing
towards fruition.  Internal
management reports to be
prepared reflecting on
progress against Benefits
Realisation Strategy.  As at 1
April 2018 had realised
budget savings of £2.031m
against a target of £1.510m 
19/5/25
12 Performance Performance Metrics are
missed. The Service
monitors the metrics and
also compares
performance against the
APSE average. 
A standardised operational process
and procedures has been developed
to ensure efficient and effective
processes and verification measures
are in place. 
1 4  4 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Performance metrics are
reviewed and developed with
the Pentana System being
used to review performance. 
Performance is reviewed at
every Management meeting. 
19/5/25
79

Page 80

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
13 Procurement Insufficient due diligence
carried out by the Ayrshire
Roads Alliance in the
procurement of goods and
services. – standardised
processes and
procedures in line with
Council’s contract
procedures.
Standardised processes and
procedures have been developed to
ensure efficient and effective
processes and verification measures
are in place. 
1 4  4 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Managed Risk. 
19/5/25
14 Programme
Management
Programme scope,
schedule, objectives, cost
and deliverables are not
clearly defined or
understood. 
Estimating and / or
scheduling errors. 
Unplanned work that must
be accommodated. 
Lack of co-ordination /
communication 
Underestimated support
resources or overly
optimistic delivery
schedule 
Unresolved Programme
conflicts not escalated in
a timely manner. 
Unanticipated escalation
in Programme costs as a
result of uncontrolled
changes or continuous
Clear definition of scope, schedule,
objectives, cost, and deliverables
through Service Improvement Plan,
Benefits Realisation Strategy & Plan,
and Customer Service Strategy. 
A Programme Plan has been
developed which illustrates key
activities, team, timing, milestones,
and delivery of products. 
Incorporate unplanned work within
Programme Plan and minimise
impact on delivery of products
through parallel processes when
feasible 
Programme co-ordination and
communication conducted in
accordance with Programme
governance structure 
Support resources and delivery
schedule developed from robust
Programme Plan and previous
experience of similar Programmes 
Programme conflicts recorded in
Issues Log and progressed in
accordance with reporting
arrangements for project team 
Escalation of Programme costs
addressed through appropriate and
applicable corrective actions and
control measures. 
1 4  4 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Managed Risk 
19/5/25
80

Page 81

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
inflation of a project’s
scope beyond initial remit 
Unanticipated delays in
Programme timescale as
a result of uncontrolled
changes or continuous
inflation of a project’s
scope beyond initial remit 
Communication Strategy
to engage public
awareness not planned
on a joint Ayrshire basis 
Priorities change on
existing service delivery. 
Affordability of future
service payments. 
Councils withdraw or
cannot provide sufficient
support, or agreed level of
input is not provided
resulting in Programme
delays 
Delay of Programme timescale
addressed through appropriate and
applicable corrective actions and
control measures. 
Ensure that a robust Communication
Strategy and response network is
developed during planning stages of
Programme which incorporates
sufficient key review stages to ensure
effective communication of key
messages regarding deliverables and
progress 
Ensure that changes on existing
service delivery are communicated in
accordance with the existing Service
Level Agreement 
Ensure that East Ayrshire Council
and South Ayrshire Council are fully
aware of the budgetary implications
required to meet the on-going cost of
service provision, as detailed in the
DBC, and have fully committed
sufficient financial resources
following Business Case sign-off. 
Early identification of problems, and
dialogue with Council.  The Ayrshire
Roads Alliance is developing a
module to project manage work
requests received by other Service
providers with East and South
Ayrshire Councils. 
15 Health & Safety /
Risk & Insurance
Insufficient investment,
resources and on-going
maintenance to resolve
issues identified in Health
& Safety surveys of
depots are on-going. This
also includes ensuring
security is adequate. New
harbour facility was
constructed along with
Issues identified in Health and Safety
Surveys are recorded on Issues Log
along with corrective actions to rectify
/ bring up to the required standard.
To ensure that Health and Safety
processes are always followed, this
is a standing agenda item held at
monthly management meetings.  In
addition to a separate H&S group 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
South Ayrshire Council
continues to have ownership
for and maintenance of
depots/harbour within their
area.  Responsibility of
funding the various mitigation
actions identified in the
Issues Log sits solely within
the control of South Ayrshire
Council.  East Ayrshire 
19/5/25
81

Page 82

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
additional fencing, gates
and stillage for timber. 
Dredging is carried out bi-
annually.  Works have
been completed at
lifeboat station and new
sheet piling to be installed
along timber jetty. The
Ayrshire Roads Alliance
operates from and
manage risk of
enforcement action and
penalties should HSE
become involved.
that meets on a quarterly basis with
the H&S Officer.  Risk assessments
and safe systems of work have also
been developed and are in place with
H&S assistance.
Council has ownership and
responsibility for their depots. 
16
Development
Control – Road
Bonds
Inadequate coupon
values of Road Bonds
exposes the Roads
Authority to a potential
shortfall if the roads works
have to be completed by
them in the event that a
developer defaults.
The coupon value of Road Bonds
that are more than three years old
are reviewed to determine their
adequacy.  Where a shortfall is
identified, the developer will be
advised to increase the value of the
Road Bond held when an application
is made for an extension to the Road
Construction Consent (RCC), which
is normally valid for three years. 
2 4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
If the road authority is
required to complete a
development road then only
the cost up to the value of
the Road Bond can be
recovered from the provider. 
Any shortfall has to be met
by the roads authority.  A
complete review of the
process of delivering road
bonds has been completed 
19/5/25 
17
Bridges and
Structures
Inadequate inspection
and maintenance of
structures, bridges and
culverts due to aging,
increased live loads,
cracking corrosion,
environmental effects
(freeze and thaw cycles)
and fatigue
Rolling programme of repair,
rehabilitation or replacement (for
weak bridges) through Council
Capital Budgets. 
2 4  8 [C]
Bridges & Design
Manager
Head of Roads
– Ayrshire
Roads Alliance
Bridges and culverts are
defined as structures with a
span in excess of 900mm.  19/5/25 
18 
Flooding Receipt of less Grant
Aided Expenditure
funding than anticipated
for flooding mitigation
schemes administered by
SEPA.
Potential lack of sufficient
funding for flooding
mitigation schemes if cost
of schemes exceeds
Grant Aided Expenditure
(GAE) due to Relief
Events or Force Majeure.
Seek capital funding from Council(s)
to bridge funding gap for flooding
mitigation schemes declared in Flood
Risk Management Plan. 
2 4  8 [C]
Bridges & Design
Manager
Head of Roads
– Ayrshire
Roads Alliance
The Councils have a legal
duty under the Flood Risk
Management (Scotland) Act
2009 to implement flooding
mitigation schemes declared
in the Flood Risk
Management Plan. 
Only 80% of principal funding
for flooding mitigation
scheme.  However increased
costs due to relief events or
force majeure is not funded 
19/5/25 
19
Financial Potential swift decline in
value of Pound Sterling
due to Force Majeure or
material adverse change
Mitigation measures would be put in
place to prioritise front line services
as detailed in the specific Business  2  4  8 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk.  The impact
of the United Kingdom exit
from the European Union has
still to be evaluated.  On-
19/5/25
82

Page 83

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
resulting in increased
costs in terms of fuel
prices, interest rates and
insurance premiums.
Continuity Plans for office, depot and
harbour, as applicable
going discussions with
Transport Scotland, COSLA
and Ayrshire Roads Alliance
on the impacts on the
transport network. 
20
Contractual
Agreement
Potential swift decline in
value of Pound Sterling
followed by market
volatility over the short to
medium term resulting in
suppliers and contractors
terminating agreements
due to Force Majeure or
material adverse change.
Mitigation measures would be put in
place to prioritise front line services
as detailed in the specific Business
Continuity Plans for office, deport
and harbour, as applicable. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk.  The impact
of the United Kingdom exit
from the European Union has
still to be evaluated.  On-
going discussions with
Transport Scotland, COSLA
and Ayrshire Roads Alliance
on the impacts on the
transport network. 
19/5/25 
21
GDPR  The existing Data
Protection Act 2018 was
brought about by the
General Data Protection
Regulation (GDPR) which
is an EU Regulation that
sets out the changes that
the UK will implement in a
new Data Protection Act.
Follow Corporate Procedures 
3 3  9 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
22
Presence of Coal
Tar within the
carriageway
network
Coal Tar is a known
material used in the
construction of
carriageways until the
mid-80s and is now
known as a carcinogen
and hazardous waste
material.
Reduce the level of risk by coring all
works prior to design.
Ensure an appropriate solution within
the design is prepared which is either
to retain in-situ and record presence,
or remove and dispose of in
accordance with current guidelines. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed Risk; Ayrshire
Roads Alliance has a duty of
care to all employees in
accordance with the Health
and Safety at Work Act
1974,Construction Design
and Management
Regulations 2015 and the
disposal of hazardous waste. 
19/5/25 
23
Service The impact of the United
Kingdom exit from the
European Union
Mitigation measures are in place to
prioritise front line services as
detailed in the specific Business
Continuity Plans for office, depot and
harbour as applicable. 
4 3  12 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance
Managed risk.  Ongoing
discussions with Transport
Scotland, COSLA and
Ayrshire Roads Alliance on
the impacts on the transport
network. 
19/5/25 
24
Transport Increased cost of vehicle
maintenance due to lack
of investment in fleet
replacement
To mitigate the risk of increased
maintenance costs through lack of
fleet investment a comprehensive
maintenance programme is in place
for all vehicles in addition to a vehicle
replacement programme developed
to identify the optimum life cycle for
fleet. 
3 3  9 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   
19/5/25 
25
Transport Loss of operational base
for any reason
(Crookedholm Depot)
To mitigate the impact of the loss of
the transport depot and garage,
business contingency plans have
been developed that highlight how
and where office based staff will work
in addition to the steps to ensure that 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   
19/5/25
83

Page 84

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
maintenance is undertaken, which
would be to activate external
maintenance frameworks. 
26
Transport Loss of public utilities for
an extended time
including electricity and
water.
Business continuity plans are in
place to allow for the whole service to
continue to function in the case that
utilities are lost for an extended
period of time. 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
27
Transport Loss of confidential
information and
appropriate handling of
information will lead to
breaches of data
protection and potential
significant financial
penalties being incurred
by the Council
All staff that handle personal details
have undertaken e-learning to advise
of appropriate data protection steps
required and where appropriate
electronic systems are in place for
recording and management of
personal data to avoid paper being
lost or misplaced. 
1 4  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
28
Transport Passenger transport –
late / non-attendance /
vehicle breakdown by pick
up vehicle – Failure of
service as Service as user
would miss Transport link
connection / arrives late at
destination activity / part
activity
The delivery of passenger transport
is managed on the Council’s behalf
by SPT.
If there is an issue where there is a
failure in service provision SPT would
be required to organise a
replacement service, working in
conjunction with Officer locally within
EAC. 
2 2  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
29
Transport Passenger transport –
escort not in attendance
ASN contracts / Council
owned vehicles service
failure.  Service not able
to be provided until escort
arrives.  Server user
misses activity / part
activity  
Should an escort not be available
H&SC services would arrange to
provide another responsible
individual available to ensure that the
service can be delivered.
In the unlikely case this cannot be
accommodated, the parent would be
notified and alternative arrangements
made for the transport of the child to
the school. 
1 4  4 [T]
Strategic      
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
30
Transport No driver available to
deliver service due to
annual leave / sickness
absence. Service not able
to be provided service
user misses activity / part
activity 
Any shortage of driver would result in
arranging for an alternative qualified
individual within transport services to
drive, or to work with Coalfield
Community Transport to deliver the
service. 
1 3  3 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
31
Transport Passenger transport :
Emergency closure of
schools and contractors
unable to provide
Should schools need to close
unexpectedly, all parents will be
contacted to request that children are
collected ASAP.  Teachers will
remain with children until the last one  1  4  4 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25
84

Page 85

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
transport within relevant
timescales - 
has been collected safely by a
parent. 
32
Transport Passenger Transport:
Documentation out of
date risk to service users. 
Potentially inappropriate
individuals, inappropriate
vehicles used being used
to provide service 
Documentation is reviewed and
approved on an annual basis to
ensure that the correct data is held
for pupils, parents, schools and
transport operator information.  1  5  5 [T]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25 
33
Transport Passenger Transport:
Contractor unable to fulfil
obligations due to
bankruptcy etc.  Service
failure not able to be
provided until alternative
arrangements made. 
Server user misses
activity / part activity
SPT manage all transport on behalf
of EAC.  In the case of a contractor
going out of business, an alternative
contractor will be sought.  Where this
cannot be provided, parents will be
contacted and alternative
arrangements may need to be made
for the provision of transporting
school children such as providing a
mileage allowance to parents until an
alternative solution can be
implemented. 
1 4  4 [C]
Strategic   
Manager
Head of Roads
– Ayrshire
Roads Alliance   19/5/25
34 EV Charging Tariff Negative feedback to both
authorities
On approval by Cabinets a full
programme of public communication
to be issued
2 3 6[R] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   16/2/24
35 Material Shortages
and Price Increases
Steel products, timber,
electrical equipment and
aggregates have seen a
price increase with
aggregates prices falling
back in the spring.
This is as a result of
market cost increase of
raw material affecting
suppliers, supply chains,
shipping, transportation
and Construction costs. 
Increased admin at UK
ports due to EU Trade
Cooperation has resulted
in increased
transportation costs, raw
materials and surcharges.
Where there are problems we are
working with supplier to optimise
deliveries to get procure best value
under the circumstances.
4 3 12 [C] Strategic
Manager
Head of Service
– Ayrshire
Roads Alliance
This will be under constant
review with contractors. 
19/5/25
36 Storage Related
Risks
Theft / Damage of Stores Risk is very low as there are many
measures that have been put in
place.  For example – CCTV
cameras, secure entry to the depots,
insurance covers all depots for theft /
1 4 4 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   
19/5/25
85

Page 86

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
damage, robust store person / key
holder procedures in place
37 Ash Die Back Potential for death or
injury as a result of ash
dieback related accidents,
both to professionals
working on trees, and to
the general public
Increased safety issues
due to declining ash trees
on roads, owned and
managed land such as in
county parks, housing,
estates, schools, routes to
school, active travel
routes and other well-
used paths
Risks to statutory
functions or service
delivery such as retaining
safe schools, public open
spaces or roads
Risks to staff and
community from trees on
adjacent land falling into
your estate
Ash Trees within the public network
with a fall range will be inspected and
prioritised.
P1 Immediate Felling
P2 Monitor and Fell if moved to P1
P3 Monitor and Fell if moved to P1
Private landowners will be advised of
any trees within their land which
could impact on the public network.
Under Road Scotland Act 1984 ARA
have the authority to pursue
landowners and remove diseased
trees and recharge
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   
19/5/25
38 Ukrainian Crisis /
Middle East Crisis
Increasing cost of bitumen
and the potential of short
supply due to Russian
sanctions and increased
costs.  May also result in
rising fuel and delivery
costs
Pre-programming with suppliers and
contractors as well as monitoring
through revenue period reviews.
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   19/5/25
39 Fuel - Red Diesel  No longer permitted to
use red diesel within
construction vehicles.
This has an impact on
project costs and the
overall programme.
Reviewing alternative forms of fleet,
however, this brings additional cost.
4 3 12 [C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   19/5/25
40 EV Charging
concession contract
Failure to attract a private
partner
Robust and detailed tender package
to be issued through the procurement
process
2 3 6[T] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance   19/5/25
41 Energy Costs
fluctuation
Impact on revenue
budgets
Robust period review of energy costs
for lighting and EV chargers.
3 3 9[C] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance 
19/5/25
86

Page 87

APPENDIX 1: AYRSHIRE ROADS ALLIANCE RISK REGISTER                                                                                                                                                                                                                                                                       
Official
Risk ID Risk Category Risk Description Risk Mitigation Actions Likelihood Severity Risk Rating after
Mitigation measures
Responsible for
managing the risk
Risk Owner Additional Comments Date of last
review
42 Land acquisition
and other legal
resource
requirement
Lack of available
resources resulting in
delays to projects
Triage projects at regular update
meetings. Consider outsourcing
Legal work.
4 3 12 [T&R] Strategic
Manager
Head of Service
Ayrshire Roads
Alliance 
19/05/25
43 Procurement Scotland Excel Contract
Framework delays
Review alternative Frameworks to
procure Material and Services  5  3  15 [C]
Service Managers Head of Roads
– Ayrshire
Roads Alliance
Alternative Framework
documentation would be
significantly different from
SXL.  Additional staff time
may be require to complete. 
19/5/25
44 United States
Trade Agreement 
This is as a result of
market cost increase of
raw material affecting
suppliers, supply chains,
shipping, transportation
and Construction costs. 
Where there are problems we are
working with supplier to optimise
deliveries to get procure best value
under the circumstances.
4 3 12 [C] Strategic
Manager
Head of Service
– Ayrshire
Roads Alliance
This will be under constant
review with contractors.  19/5/25 
87

Page 88

88

Page 89

Official
AYRSHIRE SHARED SERVICE JOINT COMMITTEE 
06 June 2025 
Report by the Head of Ayrshire Roads Alliance
______________________________________________________________ 
SUBJECT: ROADWORKS PROGRAMME 2025/26
______________________________________________________________ 
Purpose of report 
1. The purpose of this report is to advise the Joint Committee on the progress of
work through the roads improvement programmes within East Ayrshire and
South Ayrshire for financial year 2025 to 2026. 
Recommendations 
2. It is recommended that Joint Committee: 
(i) Notes, the Ayrshire Roads Alliance programmed works 2025/26
(ii) Otherwise, notes the contents of this Report.  
Background 
3. The budget allocation for East and South Ayrshire Councils Roads Investment
Programme for FY 2025/26 can be seen in tables 1 and 2 below respectively. 
Table 1: East Ayrshire Council Roads Investment Programme 2025/26 
Programme Area Budget (£m)
Carriageway Resurfacing 2.305
Footway Resurfacing 0.150
Street Lighting 0.215
Traffic & Transportation incl. road safety 0.330 
Active Travel 0.050
School Streets 0.050
Bridge and Culvert Strengthening 
(incl. road slips)
3.500
Car Parks incl. Multi-storey demolition 0.820
Fleet 0.600
Total  £8.020
External Funding (Confirmed) 
SPT – Behaviour Change £0.385
Transport Scotland – Behaviour Change £0.116
ATIF - Tier 1  £0.758
Developer Contributions/Route Action
Plans
£0.396
SG – EV Infrastructure Fund £2.800
Total £4.455
Agenda Item 7
89

Page 90

Official
External Funding (To be Confirmed) 
Sustrans – Annick Valley Stage 2 £0.175 (Tbc.)
ATIF Tier 2 - Design £2.405 (Tbc.)
Road Safety Improvement Fund £0.270 (Tbc)
SPT General Bus Infrastructure £0.270 (Tbc)
Total £3.120 (Tbc.) 
Table 2: South Ayrshire Council Roads Investment Programme 2025/26 
Programme Area Budget (£m)
Carriageway & Footway Resurfacing 1.581
Street Lighting 0.150
Bridges Capital 0.881
Millennium and Craigholm Bridges 0.145
C12 Dunure slope stabilisation 0.130
Vehicle restraint barriers 0.073
Cattle grid renewal 0.033
Girvan Harbour Jetty repairs 0.504
Local Flood Risk Plan 0.153
Ayr Depot 0.250
Climate Changes St Ninians Park 0.255
EV Charging Infrastructure 0.281
Total £4.436
External Funding (Confirmed) 
SPT – Behaviour Change £0.170
Transport Scotland £0.116
Tier 1 – Active Travel Funding £0.737
ATIF–Tier 2(Dundonald – Barassie) £2.500
Ayrshire Growth Deal £0.857
Levelling Up Fund (Active Travel) £4.000
Total £8.380
External Funding (To be Confirmed) 
Levelling Up Fund (Burns Statue) £15.000 (Tbc.
Sustrans £2.788 (Tbc.)
ATIF Tier 2 - Design £1.626 (Tbc.)
Road Safety Improvement Fund £0.270 (Tbc.)
SPT – Bus Infrastructure Improvements £0.100 (Tbc.)
Total £18.870 (Tbc.) 
Note: Several funding applications have still to be confirmed. The affected areas
of potential funding are denoted by the use of “£Tbc.” in Tables 1 and 2 above. 
Main report/main issues 
4. Surfacing programmes for FY 2025/26 are contained within Appendices One and
Two. 
90

Page 91

Official
Capital Resurfacing 
5. In East Ayrshire 1% of the carriageway resurfacing programme has been
completed with some delays with the programming of the remaining works due
to the need to re-tender the contract for coal tar testing which must be carried
out ahead of any works. It is anticipated that this new testing contract will be
issued within the next month which will allow works to be programmed and
completed before the end of the financial year.   
6. In South Ayrshire we have completed 20% of the carriageway programme with
an anticipated completion date of October 2025.  Footway resurfacing
programme commences in September 2025 and with an anticipated completion
date of November 2025.  There has been several carriageways and footways
that have tested positive for coal tar which required additional control measures
to be put in place.  Some locations identified for 2025/26 have been carried
forward and rescheduled to 2026/27 programme. 
East Ayrshire Council residential road and footway repairs (Additional Revenue
Funding) 
7. At Cabinet on 13 March 2025, East Ayrshire Members Initiatives approved £800k
revenue funding for residential and footway repairs with locations identified
detailed within Appendix 2 of this report. 
South Ayrshire Council Ward Investment Programme 2025/26 
8. Officers within our engineering disciplines continue to develop work schemes
identified by Ward Members under the South Ayrshire Council Ward Investment
Programme for 2025/26 as detailed within Appendix 4 of the report.  Note:  Sites
will be further added as discussions progress with Officers and Ward Members. 
Timber Transport 
9. Two grant funded locations in South Ayrshire for 2024/25 are now complete. 
10. 5no. locations in the East and 2no. locations in the South were submitted by
Officers for Timber Transport funding.  All have been ranked just below the
threshold limits and consequently were unsuccessful to secure funding for
2025/26.  A meeting will be arranged to review our application process for when
the window opens for 2026/27 applications. 
Street Lighting 
11. Street lighting column and cable replacement programme of works which
incorporates LED lanterns is detailed in Appendix 1 and 2. 
12. Ayrshire Roads Alliance is actively exploring alternative procurement routes due
to a further delay of Scotland Excel Street Lighting Material Framework which is
hampering the completion of the LED project in the East.
91

Page 92

Official 
Electric Vehicle Infrastructure 
13. The Electric Vehicle Infrastructure Fund (EVIF) programme with the number of
public chargers installed to date is listed within Appendix 3 for South and East
Ayrshire respectively. 
14. East Ayrshire Council is the lead authority for the PAN Ayrshire Public Electric
Vehicle Charging Strategy. The project has secured a grant of £2.8million and
work continues on the procurement phase. Following the previously approved
business case, further papers have been presented to the cabinet regarding the
introduction of an EV charging tariff, which has been implemented across all
three Ayrshires as of 1st January 2025. A further increase to tariff will be
implemented on 1st July 2025. This tariff aims to establish a sustainable funding
model and attract private investment. 
15. Work continues on the tender documentation for the Pan Ayrshire concession
contract with the appointment of Mott MacDonald as consultants to assist with
the collation of the relevant documents required for tender. The Single
Procurement Document (SPD) was issued on 3rd March 2025 for the initial stage
of tendering, followed which we received numerous bids. The evaluation is
currently ongoing, with the Invitation to Tender (ITT) to be published in June 2025
for the shortlisted bidders, followed by contract award in October 2025. 
16. All Rapid Chargers are required under the Public Charge point regulations 2023
legislation to be able to accept contactless payment by 24th November 2024. 
Ayrshire Roads Alliance has secured funding from Transport Scotland
Contactless Compliance Grant Funding to replace/activate/retrofit eligible CPS
rapid chargers to incorporate contactless payment. Works have been carried out
to replace the non-compatible units and to activate contactless terminals on
compatible rapid chargers. 
17. Replacement of 22kW charger at Troon Swimming Pool is approved by SAC to
come from their capital fund. Replacement of 50kW chargers at Burns Statue
Square, Ayr and Girvan Harbour are funded by the Contactless Compliance
Funding. 
Structures 
18. Land acquisition and/or access agreements alongside environmental license
requirements continue to cause delays to a number of projects. ARA are working
closely with EAC Legal/Estates and relevant stakeholders to progress these
issues. 
19. Appendix 2 details East Ayrshire Council Bridges Capital programme for
2025/26. Seven works contracts are near tender ready. 
20. A Consultant has been appointed to carry out Principal Inspections on 437 EAC
structures. These are ongoing and should be complete by end of May 2025. The
internal Principal Inspection program for 2025 is underway. 
92

Page 93

Official 
21. A713 Polnessan Upper Bridge - ARA have erected temporary traffic signals due
to subsidence in the carriageway. Traffic lights will remain in place until the slope
has been stabilised. There has been some disruption to Windfarms and Sub-
stations in the area and ARA working closely with developers to find alternative
routes for their abnormal load movements. A consultant has been appointed and
discussions are ongoing regarding a permanent solution. 
22. B741 Coal Glen Embankments works have been awarded; however, the works
have been postponed due to issues with a 132kV SPEN cable in the carriageway.
ARA are in ongoing discussions with SPEN, the contractor, legal services and
insurance to find a solution, works are now not likely to be completed until
2025/26. 
23. B713 near Sorn road slip sheet piling works are ongoing. Works going well,
programmed to be complete beginning of July 2025 
24. ARA are working with EAC Legal/Estates to acquire land at West Clerkland
Bridge through a Compulsory Purchase Order. The bridge has been shut to
vehicular traffic since 2012 and shut to both pedestrians and vehicular traffic
since 2021. 
25. 3no. bridges on the A71 between the Bellfield Interchange and Moorfield
Roundabout need replacement expansion joints. A consultant was appointed to
explore options in removing the joints and making the structures semi/fully
integral. It has been decided that in the meantime 2 joints that are repeatedly
failing will be replaced with asphaltic plug joints. 
26. B730/10 Littlemill Bridge land acquisition complete after years of negotiation.
Tender documents to be reviewed and works put out to tender with a view to start
on site in Spring 26. 
27. The South Pier Quay at Girvan Harbour has been assessed to have a load
carrying capacity of 0.5 tonnes per square metre. Following dive surveys
undertaken earlier this year the option chosen to extend the life of the structure
is steel plate repairs to the existing sheet piles and grouting of the voids. All
technical contract documentation has been completed and the tender process is
ongoing. It is anticipated that tenders will be issued in June with works
commencing on site in August/September. 
28. The detailed design of the Girvan Harbour Timber Jetty works are progressing
again now that the South Pier Quay design work has been completed. 
Submission of the contract documentation for review is expected in July 2025
followed by the tender process in August 2025 led by East Ayrshire Council
procurement. 
29. The A79/30 Victoria Bridge Concrete Repairs and Painting on site work is
currently paused.  The Marine Licence 28 day consultation process is ongoing
93

Page 94

Official
and will be concluded on the 21st May 2025. It is expected that determination of
the Marine Licence will take place soon afterwards, allowing the work to continue.   
30. Girvan Harbour dredging. Funding has been secured from SAC to carry out the
first phase of dredging in 2025/26to re-establish full operational status for the
RNLI lifeboat.  Dredging will be carried out in two areas to ensure the RNLI
lifeboat can operate at all tides. Area 1 is in the main channel where a 15m wide
x 181m long dredge will take place to 1.5m below chart datum. Area 2 is at the
RNLI Pontoon where a 15m wide x 43m long dredge will take place to 1.5m below
chart datum. All dredge material will be taken on shore and disposed at landfill.
Discussions are ongoing with SEPA and Marine Scotland to establish if any
works can be carried out prior to the end of the bathing restrictions in mid
September. 
31. Ayr South Pier. In May 2022 ARA and South Ayrshire Council agreed a
procedure for the inspection of Ayr South Pier as there did not appear to be an
inspection regime in place for this significant piece of Ayr Common Good
infrastructure. A key element of the procedure is that : 
“South Ayrshire Council, Asset Management and Community Asset Transfer –
Housing, Operations and Development Directorate are the owner of the asset,
responsible for liaison with the Ayrshire Roads Alliance and funding / carrying
out repairs” 
32. A key type of inspection detailed in the procedure is underwater inspection by
divers and to this end a 2024/25 Business Case submitted for Capital funding to
employ a consultant to carry out an underwater dive survey and structural
assessment was submitted. This was not accepted as the asset was Ayr
Common Good. A dive survey and assessment requires to be carried out soon
and we need to find a way of making this happen. No alternative method of
funding has been identified which is a matter of concern. 
33. On the 3rd February 2025 a sink hole was reported which had developed at the
land end of the South Pier in a verge area. Emergency repairs were required
immediately and follow up repairs are needed highlighting the importance of a
dive survey and assessment. Funding is being sought for this.   
Traffic & Transportation 
34. Active Travel Infrastructure Tier 1 grant funding has been received from
Transport Scotland.  Active Travel projects using the Tier 1 funding is currently
in development, and will be implemented over the course of the current financial
year. 
35. There was a reported underspend in EAC of £170k in 24/25 which has been
carried forward and the associated delayed projects have been included in this
years project list contained in Appendix 2. 
36. Confirmation of the Road Safety Improvement Fund grant allocations is pending
but it is anticipated that this years allocation for EAC will be in the region of £300k
94

Page 95

Official
and for SAC £219k. Schemes are currently being identified and prioritised and
the schemes listed in the appendices may be subject to change pending
Transport Scotland approval. 
37. The Kilmarnock Bus Station refurbishment programme is now complete and a
new cleaning and inspection regime has been implemented. Additional funding
has been allocated this year for upgrades to Cumnock Bus Station which include
changes to materials and the installation of a public address system. 
Ayrshire Growth Deal (AGD) Roads Projects 
38. The three Ayrshire Councils have worked in partnership with other agencies,
communities and businesses to secure the first Regional Growth Deal in
Scotland. This will see £251.5 million of investment in key assets and key sectors
across Ayrshire. 
39. There are currently no transport projects within the Ayrshire Growth Deal
proposed for East Ayrshire Council however the Ayrshire Roads Alliance
recognise the strategic importance of Bellfield Interchange and will continue to
work with colleagues to secure the improvements required. 
40. By carrying out extensive modelling of the existing road network around Glasgow
Prestwick Airport/Ayrshire Growth Deal cluster and building on the LDP2 no net
detriment approach the Ayrshire Roads Alliance was able to stress-test the road
network and identify the following improvements which will reduce peak
congestion, build capacity into the network to facilitate future growth, improve
road safety and journey time reliability. 
Project Location
1 Sandyford Toll Roundabout capacity improvements
2 Dutch House Roundabout capacity improvements
3 Monktonhead Roundabout capacity improvements 
4 A79/Station Road Roundabout capacity improvements
5 Shawfarm Road Roundabout capacity improvements
6 Shaw Road/Shawfarm Road junction re-alignment/improvements
7 Active Travel links from existing network to AGD Commercial Build
8 Public Transport Infrastructure improvements 
41. Project 7 & 8 compliment the project currently being progressed under the de-
carbonisation of the road network being developed by the Ayrshire Roads
Alliance and funded by the successful Levelling Up Fund round 3 award. 
42. A Case for Change has been submitted to Scottish & UK Governments seeking
approval of the changes noted above and also the Prestwick Proposition, the
Ayrshire Roads Alliance will assist in the delivery of all these projects for South
Ayrshire Council. 
95

Page 96

Official
Levelling Up Fund
43. South Ayrshire Council successfully secured £20million of funding from the
Levelling Up Fund (LUF) round 3, £16million of this funding will be utilised to
redevelop Burns Statue Square with the remaining £4million allocated to Active
Travel. East Ayrshire Council were unsuccessful in securing funding in round 3
to improve the Bellfield Interchange. 
44. Burns Statue Square is a key initiative emerging from the Town Centre
Framework, it is a priority project to support placemaking and make the town a
more successful place to live, work, visit and enjoy. The project’s purpose is to
reshape the southern entrance to the town centre as a new attractive and
appealing gateway, involving rationalisation/ realignment of road carriageways
to create opportunity for more useable, connected, pedestrian friendly, high
quality public realm space and arrival point. 
The Ayrshire Roads Alliance procurement are exploring the potential of usingthe
SCAPE Framework to direct appoint Balfour Beattie to deliver the project on a
Design & Build basis due to the fixed budget and completion deadline of 31st
March 2027. 
45. The Ayrshire Roads Alliance will construct a new Active Travel Route linking
Dundonald to Barassie Station & improve the existing NCN7 from Prestwick to
Barassie railway stations. These improvements, which are being funded by
Active Travel Infrastructure Tier 2 funding will compliment further active travel
routes which will be delivered as part of the Ayrshire Growth Deal. 
Active Travel 
46. ARA submitted several applications to the Active Travel Infrastructure Fund
2025/26, £5.7m of construction funding in East Ayrshire & £2.878m of
construction funding in South Ayrshire was unsuccessful. We await a decision
on the remaining applications for design funding. 
47. A total of £787,000 has been secured for SPT & TS to deliver a behaviour change
programme in both South & East Ayrshire, projects including the re-
establishment of the Active Travel Hub in South Ayrshire, phase 1 construction
of an active travel innovation centre in East Ayrshire and support to the Cumnock
EV Car share project. 
Ash Dieback 
48. Following reports to Cabinets in East Ayrshire and South Ayrshire, surveys and
works are ongoing with 28-day notices being issued to owners and any
objections received referred to legal service. A detailed update report will be
presented to Joint Committee later in the year. 
96

Page 97

Official
Implications 
49. 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning x  50 & 51
2. Governance x  52
3. Human Resources x  53
4. Equality and Fairer Scotland Duty  x 54
5. Financial x  3, 55 &
Appendix 1, 2
and 4
6. Risk x  56 & 57
7. Community Wealth Building x  58
8. Net Zero x  59 
Policy/strategic planning implications 
50. A well-maintained road network will contribute to achieving the 2015-2030
Community Plan objectives and associated 2021-2024 Delivery Plans 
51. The matters referred to in this report contribute to Priority 1 of the South Ayrshire   
Council Plan: Spaces and Places/ Moving around and the environment
(Outcome 1). 
Governance implications 
52. By virtue of the relevant statutory provisions, principally detailed within the Roads
(Scotland) Act 1984, the Council as local roads authority is required to manage
and maintain all publicly adopted roads within its area other than those which are
maintained and managed by the Scottish Ministers. 
Human resources implications 
53. The work programmes have direct impact on human resources and the Alliance  
will ensure all works are suitably resourced to maintain satisfactory progress. 
Equality impact and Fairer Scotland duty implications 
54. Equality Impact and Fairer Scotland Duty screening assessments will be
undertaken annually as required during the planning stage prior to the delivery of
the programme of works. 
Financial implications 
55. The Ayrshire Roads Alliance will deliver the strategic and local services as stated
in the Service Plan. The budget is provided by East Ayrshire Council, South
97

Page 98

Official
Ayrshire Council, and other external organisations. Appropriate scrutiny
arrangements are in place to manage these budgets. 
Risk implications 
56. The Ayrshire Roads Alliance Risk Register is reviewed and presented at every 
Joint Committee. 
57. The Works Programmes, Service Plan and the Risk Register do not expose
either Council to an increased risk as they have been developed from existing
budgets and existing service commitment. 
Community Wealth Building implications 
58. The works programme provides economic levers to develop resilient, inclusive
local economies with more local spend and fair employment, as well as ensuring
that wealth is more locally owned and benefits local people. 
Net zero implications 
59. The Ayrshire Roads Alliance Service Plan and Carbon Strategy supports and
links to East Ayrshire Climate Strategy Themes 
Theme 2: Transport
Theme 4: Natural Environment 
Appendices 
Appendix 1 - South Ayrshire Council Programme of Works 2024/26 
Appendix 2 - East Ayrshire Council Programme of Works 2025/26
Appendix 3 – EV Public Chargers
Appendix 4 - South Ayrshire Council Ward Investment Programme 2025/26 
Background papers 
• East Ayrshire Council – 2025/26 Road Asset Management Plan.  Investment
and Programme
• South Ayrshire Council – Road Improvement Plan 2025 - 2026 
Person to contact. 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No. 01563 503164  
E-mail. jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Craig Knape, Strategic Manager - Ayrshire Roads Alliance
Tel No. 01563 503164 
E-mail. craig.knape@ayrshireroadsalliance.org
98

Page 99

Official
Appendix 1 
South Ayrshire Council – Programme of Works 2024/26 
Ayrshire Roads Alliance - Carriageway Structural Maintenance Programme over two years 2024 to 2026  
[Works carried forward from 2023/24] 
Route
No
Town Road Name Works
Description
Sch
eme
Sco
re
Estimated
Cost
Cost to
Date
Variance
+/-
Comments
B734 Old Dailly Barr Old Dailly Old Dailly to Penkill
+ drainage
improvements
N/A £150,813 £163,932  -£13,119 Complete 
B7035 By Girvan Glendoune Houdston
Road (Coalpots)
Braetoll South + S
Power shut down
N/A £200,000 £206,251 -£6,251 Complete 
B743 By Mossblown Ayr / Mossblown? West from
Brocklehill Farm
53 £249,002 £249,239 -£237 Complete
C37 Auchincruive Barrackhall Gibbsyard  48 £123,861 123,873 -£12 Complete
Uncl Tarbolton Springfield Road Garden Street to No
50
46 £54,275 £53,851 +£424 Complete
B742 By Coylton B742 Council Boundary -
A70/Hillhead, Coylton
By Holebogs, S bend 59 £445,000 £440,506 +£4,494 Complete
B742 By Coylton B742 Council Boundary -
A70/Hillhead, Coylton
From A70 at
Hillhead south to
C21 Craigs Road
junction
56
B742 By Coylton B742 A70 Hillhead - B744
Jcn N Of Annbank, Coylton
From Meadowhead
Depot entrance
south-wards
55 Complete
B742 By Coylton B742 A70 Hillhead - B744
Jcn N Of Annbank, Coylton
Bridge of Coyle to
C2
52
B744 Annbank Weston Brae Full Length 53 £152,000 £207,822 -£55,822 Complete
B744 Annbank Browns Crescent 
Weston Avenue
Full Length
Craighall Way to
101 Weston Avenue
53
56
U77 By Coylton Hole Road Full Length 46 £82,867 £83,064 -£197 Complete 
B7023 Maybole Crosshill Road Full Length 56 £74,687 £72,215 +£2,472 Complete
Complete
Complete 
B7023 Maybole St Cuthbert's Road Full Length 53 £30,669 £41,792 -£11,123
B7024 Maybole Alloway Road Redbrae to Bypass 51 £55,922 £96,288 -£40,366
99

Page 100

Official
C122 By Maybole  C122 Gardenrose
Path/Maybole - School
Road/Minishant, Maybole 
C122 Gardenrose
Path/Maybole - School
Road/Minishant, Maybole
School to new
Bypass 
Ladycross to new
Bypass
50  £58,095 £58,097 -£2 Complete
B7023 Maybole Ballochbroe to Crosshill Dalhowan to C58  £275,435 £362,350 -£86,915 Complete
A719
PH 2
By Maidens 
By Dunure
Pennyglen/B7023 -
Kirkoswald Road/Maidens,
Maidens 
A719 Smithy
Bridge/Dunure - Croy
Brae, Dunure
B7023 Enoch Lodge
-Caravan Park 
Cemetery to
Drumshang
67 £281,669 £326,746 -£45,077 Complete 
Complete A719
PH 1
By Maidens  Pennyglen/B7023 -
Kirkoswald Rd & 
Turnberry Rd /Maidens,
Turnberry 
Morriston Farm to
Jct Blawearie 
Maidens to
Turnberry
56  £441,666 £540,857 -£99,191
Uncl Maybole Ashgrove Avenue Full Length  £88,954 £102,985 -£14,031 Complete 
Ayrshire Roads Alliance - Carriageway Structural Maintenance Programme – New Sites identified for 2024 to 2026 
B749 Troon Monktonhill Road Southwood jct to
Isle of Pin
59 £210,000 £265,328  -£55,328 Complete.
after excavation, additional
material was required to regulate
due to sand & soft spots localised
to lots of areas in Troon 
B749 Troon Craigend Road Fullarton Drive
railway bridge to
South Beach
48 £167,500 £201,706  -£34,206  Complete
Overspend same as Monktonhill Rd
100

Page 101

Official
B749 Troon South Beach  Lochend Road to
Academy Street jct
54 £200,000 £307,540  -£107,540  Complete.
Overspend same as Monktonhill
and Craigend. 
C44 Dailly Dailly to Turnberry Farden 500m
towards Drummock
39 £112,560 £71,137  +£41,422  Complete 
B7027 Barr Knowe Road Lochtonmill
southwards 
£63,000 £53,406.44 +£9,593  Complete 
B734 Colmonell Colmonell to the A77   £106,560 £150,273  -£43,713  Complete 
B7023 Maybole C58 to Cemetary   £297,606 £271,503  +£26,102  Complete 
A70 
C39
Coylton 
Ayr
Joppa 
Doonholm Road
Hole Road jct to
Pharmacy
Alloway to The
Loaning
35 
43
£179,321  £155,377  +£23,944  Complete
C145 Ayr Hillfoot Road Holmston Rd to
Holmston Dr
54 £91,875 £123,733 -£31,858  Complete
Uncl Maybole Queens Terrace/Chesney
Grove/Kincraig Avenue
Full Road 33
33
£166,275  £174,448  -£8,173  Complete
Uncl Maybole Cargill Road Full Road 47 £46,900 £48,224 -£1,324  Complete 
C1
(STTS)
Straiton Newton Stewart Road U8 towards Straiton
to U57
44 £120,400 £119.293  +£1,107  Complete 
B7045
(STTS)
Maybole Cassilis to Kirkmichael Rd Crorieshill Farm
northwards for
360m
44 £46,750  £51,700 -£4,950 Complete
Uncl Ayr Saltpans Road North from Glebe
Road
46 £112,249 £118,940 -£6,691  Complete 
Uncl Prestwick Morris Road Full Road 43 £55,000 £107,345 -£52,345  Complete
(positive for coal tar increased
costs)
Uncl Ayr Green Street Waggon Road to
Crown Street
42 £130,000 £214,584 -£84,584  Complete
(positive for coal tar increased
costs)
Uncl Prestwick Craigie Street Full length 39 £30,000 £36,725 -£6,725  Complete
101

Page 102

Official
B744 By Annbank B744 Belston/A70 -
Weston Avenue/Annbank,
Ayr
Auchincruive
Junction to
Glenview
52 £120,000  £139,872  -£19,872  Complete 
B742 By Maybole Dalrymple to Barnford
Farm
Dalrymple Road 46 £130,000  £138,058 -£8,058  Complete
Uncl Maybole Hicks Avenue Full cway & fway 30 £104,000 £133,263 -£29,263 Complete
Increased estimate due to
combining footway, kerbing,
carriageway resurfacing
C59 Colmonell Craigneil Road B734 to Bridge  £67,000 £53,129 +£13,871 Complete 
Uncl Ayr Peggieshill (PH1) Dalmilling Rd to
Nursery Rd
44 £92,000 £99,038 -£7,038  Complete 
Uncl Ayr Kincaidston (PH1) Marigold Sq to
Honeysuckle Park
52 £185,000 £181,768 +£3,232  Complete
Uncl Girvan Louisa Drive Knockcushion St to
Duncan St 
£103,640 £91,410 +£12,230 Complete
Uncl Ayr Peggieshill Rd (PH2) Nursery Rd to
Fenwickland Ave
44 £100,000 £33,739  Complete
Awaiting final measure
C74 By Ayr MacNairston Rd C105 to B742
junction
52 £97,608 £22,467  Complete
Awaiting final measure
B742 By Maybole Nether Culzean Dalrymple
Rd
Barnford farm to
Nether Culzean
42 £135,000 £20,084  Complete
Awaiting final measure
Uncl Ayr Ellisland Square (Contains
Coal Tar)
Full Length 42 £125,000  2nd-13th June ‘25
Uncl Ayr Kincaidston Drive (PH2) Honeysuckle Park to
Dalmellington Rd
52 £300,000   30th June – 25th July ‘25 
Mossblown Sandyford Road From a point 180
metres east of A719
junction eastwards
for 680m
53 £140,700   19th – 30th May ‘25
Uncl Ayr Dalmilling Road (Contains
Coal Tar)
Harthall to
Mainholm Rd
37 £275,000  28th July – 16th Aug ‘25
Uncl Prestwick Bellevue Road (TO BE TESTED) From Main Street to
Adamton Road 
£38,039   8th Sept – 3rd Oct ‘25
Uncl Girvan Todd Street (TO BE TESTED) Full length 31 £32,894   28th July – 8th Aug ‘25
Uncl Girvan Fauldribbon Road (TO BE
TESTED)
Full length 34 £31,813   11th-22nd Aug ‘25
Uncl Girvan B741 Linfern Road (TO BE
TESTED)
NO.79 to no.3 near
Main Street
29 £100,517   22nd Sept – 6th Oct ‘25
Uncl Maybole Carrick Street (TO BE TESTED) Ladyland Rd  to B77 33 £26,130   25th Aug – 8th Sept ‘25
102

Page 103

Official
Uncl Maybole Wellington Street (TO BE
TESTED)
Ladyland Rd to
Carrick St
30 £18,090   1st-15th Sept ‘25
Uncl Maybole Manse Street (TO BE TESTED) Drumellan St to
Abbott St 
£20,100   8th-22nd Sept ‘25
Uncl Girvan Hamilton Street (TO BE
TESTED)
Church Sq to Bridge
St
46 £49,655.55   13th-24th Oct ‘25
Uncl Ayr Chapel Park Road Full length 40 £55,984   2026/27
Uncl Prestwick St Cuthbert’s Rd St Andrew’s Ave to
Kirklandholm 
£38,587   2026/27 
Ayrshire Roads Alliance - Footway Structural Maintenance Programme over two years 2024 to 2026
[Works carried forward from 2023/24] 
C17 Tarbolton Westport Footway North side 28 £17,370 £24,984 -£7,644 Complete 
Uncl Prestwick Hunters Avenue South from
Heathfield Road,
west side
23 £7,500 £5,393 +£2,107  Complete
Uncl Troon Morven Drive Cessnock Rd to
Dundonald Rd
(Northside) 
£15,072 £28,820 -£13,748 Complete
C151 Dailly Woodside Both sides from
Back St and
Hadyard Terr
30 £20,400 £17,147 +£3,253 Complete 
Uncl Crosshill Newton Street Church Side of road 30 £15,795 £14,440 +£1,355 Complete
Uncl Dailly Hadyard Terrace Inside footway +
part outer section
28 £54,400 £20,110 +£34,290 Complete 
Ayrshire Roads Alliance - Footway Structural Maintenance Programme – sites identified for 2024 to 2026 
Uncl Mossblown Martin Avenue Mossblown 28 £28,300 £30,829 -£2,529 Complete 
B744 Annbank Weston Brae Full Length 28 £10,700 £5,761 +£4,939 Complete
B730 Dundonald Drybridge Road Bowling Green to
Kilnford Dr
28 £19,223   18TH Aug – 5th Sept ‘25
Uncl Ayr Bellevue Crescent Full Length 34 £37,800   TBC - tree inspection required
Uncl Maidens Ardlochan Road Full Length 30 £21,000   24th-31st Oct ‘25
Uncl Dailly Church Crecent Odd numbers full
length
30 £16,800   3rd-21st Nov ‘25
103

Page 104

Official
Ayrshire Roads Alliance - Footway Structural Maintenance Programme – sites identified for future budget allocation 
B743 Mossblown Mauchline Road Fourways to railway
bridge north side
28 £15,300   2026/27
Uncl Ayr Lochpark Slab replacement 23 £20,425   2026/27 
Ayrshire Roads Alliance - Lighting Programme 2025/26 
Town Location Work Type No of
columns
Estimated
Programme Cost
Comments Variance +/-
Ayr Ayr - Old Hillfoot Road, Hillfoot
Crescent & Souter Place
Old steel columns &
unreliable 5th Core 5 £30,000 Remedial works to
complete 
Ayr Cunningham Crescent & Area Unreliable 5th Core
Supplies 16 £40,000 Final Measure to
complete 
Troon Concrete Column
Replacements Ph3
Old deteriorated concrete
columns 43 £55,000      
£125,000   
Ayrshire Roads Alliance - Traffic, Transportation and Road Safety Programmes 2025/26
(i) Road Safety Programme 
Town/Route Location Proposed Scheme Progress
Various Various locations   Various schemes (TBC), anticipated to
include:
• Route Action Plan for the
B743 at St Quivox;
• B743 review at Failford
Bridge;
• Speed reduction measures at
Coalpots Road at The
Avenue;
• Bradan Road, Troon –
enhanced crossing points;
Development of a finalised
programme for the current financial
year will follow confirmation of any
grant award from Transport
Scotland’s Road Safety Improvement
Fund (RSIF).
104

Page 105

Official 
(ii) Safer Neighborhoods 
Town Location Proposed Scheme Progress
Phase 4 20mph schemes Various roads (TBC) 20mph speed limit schemes Discussion with SAC required to
identify appropriate settlements for
inclusion in Phase 4.
Various Various locations Vehicle activated signs upgrade Pending implementation of new
contract, and extents of upgrades will
be subject to budget. 
(iii) Rural Route Action Plans 
Route Location Proposed Scheme Progress
B743  Between the A77(T) and Auchincruive (St
Quivox)
TBC Listed under RSIF schemes above –
subject to confirmation of funding. 
(iv) Active Travel Infrastructure – ATIF & Sustrans 
Town Location Proposed Scheme Progress
Various Various locations • Various smaller schemes
under Tier 1 funding, details
TBC.   
The ARA are currently developing a
package of schemes to be progressed
during the current financial year
making use of the Tier 1 grant award.
Loans From Buchan Road to the A759 Loans to Troon Phase 3 Funding application unsuccessful, new
application submitted to ATIF for
2025/26
Loans From Dundonald Road to Buchan Road Loans to Troon Phase 2 £24,500 received to install permanent
monitoring equipment
Dundonald To the northern side of the A759 Dundonald to Barassie Phase 1 Award received to treat Japanese
Knotweed on-site, full construction
• Road Safety scheme, Links
Road, Prestwick.  
105

Page 106

Official
funding application submitted to ATIF
for 2025/26.
Various Various Various Funding application unsuccessful, new
application submitted to ATIF for
2025/26
Girvan  Quay to Grangeston Girvan to Grangeston £27,378 received to complete RIBA
Stage 1, 
Ayr Town Centre Accessible Ayr £778,780 received to complete RIBA
Stage 4 of Route 1 Phase 1
Ayr-Girvan Ayr to Girvan Culzean Way £47,755 received to complete RIBA
Stage 1
Coylton Coylton Primary Access for All – Coylton £27,378 received to install permanent
monitoring equipment
Ayr, Prestwick & Troon NCN7 NCN Barrier Removal £113,500 received to remove barriers
from the NCN7 in Ayr Prestwick &
Troon to make the route inclusive.
Prestwick, Troon & Barassie NCN7 from Prestick Station to A759 Barassie Prestwick to Barassie £82,979 received to complete RIBA
Stage 2
Dundonald Junction of A759/B730 Dundonald Cross £80,000 received to install signals at
the junction of the A759/B730 
Ayrshire Roads Alliance - Structures Capital Programme 2025/26 [Includes works carried forward from 2023/24/25] 
Description   Work Type Estimated
Programme Cost 
Comments Variance +/-
A79-30 Victoria Bridge Concrete Repairs and Painting 
£432,776
Ongoing   
-£432,776
A79-40  John Street, Ayr, Railway Bridge Parapets  £362,000 Design Phase.  
-£294,580
FB.AYR-70 River Doon Cycleway Footbridge (Millenium Br)
Refurbishment
£145,000 Design Phase -£145,000
U740-10 Barbieston Bridge Replacement Design  £86,820.00 Design Phase 50% - 50% EAC / SAC funded
project as this is a boundary bridge.
-£86,820.00 
Various Locations
Vehicle Restraint Barrier Renewal £50,000  Design Phase 
+£50,000
Various Locations Cattle Grid Renewal Programme £33,600 Design Phase £-33,600
106

Page 107

Official
C12 Dunure Station Road Dunure, Slope Stabilisation 
£130,000
Design Ongoing, Construction Planned
2023/24.  A 70m long gravity retaining wall
option has been selected as the most
optimum solution. Detailed design and
contract preparation is currently underway,
however the capital budget currently
available for this project is insufficient for the
proposed solution. An additional funding
solution has been identified but has not been
presented to or approved by SAC Panel. 
-£130,000
Girvan Harbour Girvan Harbour South Pier Repairs £136,000 The South Pier Quay has been assessed to
have a load carrying capacity of 0.5 tonnes
per square metre. Following dive surveys
undertaken earlier this year the option
chosen to extend the life of the structure is
steel plate repairs to the existing sheet piles
and grouting of the voids.   
Completion and submission of the contract
documentation was delayed in order that the
significant damage caused to the South Pier
Quay by the Q-Varl boat, when it broke its
moorings in a storm, could be assessed and
any repairs required could be included in the
contract documents. The contract
documentation has been completed and it is
anticipated that tenders will be issued in
June with works commencing on site in
August/September 2025. 
-£120,759
Girvan Harbour Girvan Harbour Timber Jetty Sheet Piles 
£504,887
The sediment transfer model has been
completed including options to deal with the
defective sheet piling. The recommended
option is to remove all existing sheet piling
then replace only that on the curved section
from the lifeboat station. The design and
contract preparation is progressing on this
basis and is programmed to be completed by
July with the tender process commencing in
August 2025. 
-£504,887  
£1,881,083  
107

Page 108

Official 
Appendix 2 
East Ayrshire Council 
Ayrshire Roads Alliance – Carriageway Structural Maintenance Programme 2025/26 incl works carried over from 2024/25 
ROAD LOCATION Estimated
Cost
Cost to Date variance +/- Comment
A71 Dual Carriageway  From Moorfield Roundabout – Target Worst Sections
£300,000.00  
Programmed to
commence on
02/08/25
A736/U20 Junction
Contribution to North
Ayrshire to complete
EAC section
Junction Contribution to North Ayrshire to complete
EAC section
£15,000.00 
To be programmed
A735  From Lochridge House North Entrance to Windmill
factory Farm £182,354.25  
To be programmed
A735 Rigg Street
Stewarton From B778 to Brown Street £60,606.00 
To be programmed
B7046 Skares From Junction Newfield Rd to Recycling Centre
Additional section into Skares £116,000.00 
Programmed to
commence on
16/06/25
B769 Stewarton  From Stewarton to North Ayrshire Boundary £219,375.00   To be programmed
B743 Mauchline High
Street From A76 to Loans (School) £52,680.60  
To be programmed
B7037 Titchfield
Street Galston From Mini Roundabout to Orchard Street £97,500.00  
To be programmed
B7038 Kilmarnock
Campbell Street From: Fire Station AC / To: Willock Street                   £41,595.40  
To be programmed
C3 Barskimming Road
Mauchline From Loudoun Street to StationRoad £74,074.00  
To be programmed
C108 Stewarton From Greensland to Boundary £114,750.00   To be programmed
C22 Coal Road
Auchinleck From Railway bridge to Barbieston Road £35,612.50  
To be programmed
U55 Galston  From U56 approx 1000m Westwards £78,750.00  
Complete - final
measure
Kilmarnock New Mill
Road From Chapmans Terrace to end £45,584.00  
To be programmed
108

Page 109

Official
Kilmarnock Whatriggs
Road From Tinto Avenue to Haining Avenue £35,612.50  
To be programmed
Kilmarnock East Shaw
Street From Lidle to and around mini roundabout £37,814.00  
To be programmed
Kilmarnock Bentink
Street On Approach to Mini roundabout £20,797.70  
To be programmed
Kilmarnock Bellsland
Grove Full Length £19,080.00  
To be programmed
Kimarnock Beech
Avenue From Portland Road to Larch Place £84,501.40  
To be programmed
Kilmarnock Pine Road Full Length £42,022.75   To be programmed
Kilmarnock Old Irvine
Road From Lindsay Street to Grange Street £37,464.35  
To be programmed
Kilmarnock
Brackenhill Avenue Full Length  £32,323.20  
To be programmed
Kilmarnock Arran
Avenue  Full length  £36,182.30  
To be programmed
Kilmarnock Lainshaw
Avenue One Section £71,225.00  
To be programmed
Kilmarnock Townend Full Length £27,065.50   To be programmed
Stewarton Avenue
Square Access Road into car park £11,396.00  
To be programmed
Kilmaurs East Park
Crescent Full Length £34,045.55  
To be programmed
Galston Western
Road Outside Primary School £29,487.15  
To be programmed
Hurlford Mayfield
Avenue Full Length £57,855.42  
To be programmed
Fenwick Skernieland
Road From Old A77 Slip to Rysland Terrace £44,053.31  
To be programmed
Cumnock Hearth
Road Full length £89,909.25  
To be programmed
Drongan Lane
Crescent Full Length £27,195.00  
To be programmed
Bellsbank Corserene
Terrace Full Length £29,526.00  
To be programmed
Dalmellington
Gateside Road Broomknowe to B741 £31,080.00  
To be programmed
109

Page 110

Official
Dalrymple Cedar
Terrace  Full Length £15,540.00  
To be programmed
Drongan Mill o Shield
Road From Coyle Avenue and Garrowhill Drive £37,749.25  
To be programmed 
Ayrshire Roads Alliance – Footway Structural Maintenance Programme 2025/26 incl works carried over from 2024/25 
Ayrshire Roads Alliance - £800k Residential Carriageway/Footway Improvement Programme 2025/26 
WARD Location Estimated
Costs
Cost to Date Variance +/- Comment 
1
Carriageway - Stewarton Dornie Close  £9,120.00   To be programmed
1 Carriageway - Stewarton Braemore Road £11,310.00   To be programmed
1 Carriageway - Stewarton Kirkmuir Drive £54,000.00   To be programmed
FOOTWAY LOCATION Estimated Cost Cost to Date variance +/- Comment
Catrine - Newton
Street Outside School £7,290.00  
To be programmed
Auchinleck - Main
Street From Surgery to Council Car Park £21,870.00  
To be programmed
Cumnock -
Glaisnock Road Outside Cemetery £19,044.00  
To be programmed
Kilmarnock -
Dundonald Road Outside School £16,200.00  
To be programmed
Kilmarnock -
Gilmour Street Various Locations £21,060.00  
To be programmed
Stewarton - High
Street From Old Bank to Church £16,200.00  
To be programmed
Stewarton -
Lainshaw Street Standalane to Sainsbury’s Rear Entrance £19,260.00  
To be programmed
Fenwick - Skerniland
Road Both Sides £22,680.00  
To be programmed
Galston - A719
Opposite Loudoun
Academy From Nursing Home to Barriered Section £8,100.00 
To be programmed
110

Page 111

Official
2 Carriageway - Kilmarnock Tourhill Road £5,580.00   Complete – final measure
2 Carriageway - KilmarnockAuchencar Drive £15,120.00   Complete – final measure
2 Carriageway - KilmarnockWardneuk Drive £6,165.00   Complete – final measure
3 Carriageway - Kilmarnock Woodside Avenue  £60,000.00  
To be programmed
4
Carriageway - Kilmarnock - Anderson Place/Bannerman
Drive and Drummond Place
£46,200.00   To be programmed
4 Carriageway - Kilmarnock Sparrow Gardens £12,960.00   To be programmed
5 Carriageway - Kilmarnock Simonsburn Road £9,225.00   To be programmed
5 Carriageway - Kilmarnock Elderslie Crescent/Ayr Road £13,500.00   To be programmed
6 Carriageway - Newmilns Sheilds Road £28,050.00   To be programmed
6 Carriageway - Darvel West Donnington Street £16,800.00   To be programmed
6 Carriageway - Darvel Jaimieson Road £17,400.00   To be programmed
7 Carriageway - Mauchline Clarinda Crescent £23,100.00   To be programmed
7 Carriageway - Mauchline East Park Avenue £25,560.00   To be programmed
7 Carriageway - Mauchline Southpark Avenue £7,800.00   To be programmed
7 Carriageway - Mauchline Welton Road £19,950.00   To be programmed
7 Carriageway - Mauchline Mansfield Road £43,500.00   To be programmed
8 Carriageway - Cumnock Latta Crescent £20,010.00   To be programmed
8 Carriageway - Cumnock Nans Terrace £16,500.00   To be programmed
8 Carriageway - Cumnock Lorimer Crescent £44,550.00   To be programmed
8 Carriageway - Cumnock Hearth Place £24,000.00   To be programmed
8 Carriageway - Cumnock Bank Avenue £21,420.00   To be programmed
8 Carriageway - Logan Holmhead Crescent £36,600.00   To be programmed
8 Carriageway - Logan Dixton Avenue £21,690.00   To be programmed
9 Carriageway - New Cumnock Castlemains Avenue £42,000.00   To be programmed
9
Carriageway - Dalmellington Church Hill/Melling
Terrace £36,330.00   To be programmed
9 Carriageway - Dalmellington Knowehead £41,820.00   To be programmed
9 Carriageway - Ochiltree Gallowlee Avenue £20,490.00   To be programmed
4 Footway – Hurlford Furnace Court £15,750.00   To be programmed
6 Footway – Galston Bridge Street £3,750.00   To be programmed
6 Footway – Darvel Glen Crescent £17,500.00   To be programmed 
111

Page 112

Official 
Ayrshire Roads Alliance - Lighting Capital Programme 2025/26 
Town Location Work Type No of
columns
Estimated
Programme Cost
Comments Variance +/-
Dalmellington Riecawr Ave, Area. Unreliable 5th Core. 22 £65,000 Scheduled
12 May 2025 
Galston Maxwood Road.
Unreliable 5th
Core/Concrete
columns.
10 £30,000 Scheduled
23 Jun 2025 
New Cumnock Highpark Ave, Area.
Unreliable 5th
Core/Concrete
columns.
19 £60,000  
Stewarton Lothian Rd, Area. Unreliable 5th Core 23 £60,000    
£215,000 
Ayrshire Roads Alliance - LED Lighting Programme Update 2025/26 [Works carried over from 2024/25] 
Town Lantern
Amount Status
Delivery /
start
install
Install
complete
by
Kilmarnock - Central 1400 In progress Mar 2024 Mar 2026
East Ayrshire - Decorative 350 75% complete 
tender to be awarded for next stage  Mar 2026 
Ayrshire Roads Alliance - LED Lighting Programme 2025/26 
Programme completed conversions to date 15,267 Replacement programme 97% complete
Overall LED units completed 20,910 LEDs now 98% of total EAC inventory 
112

Page 113

Official
Ayrshire Roads Alliance - Bridge and Culvert Strengthening Programme 2025/26 
Structure
Reference
Structure Name Proposed Works 2025/26
Estimate
Comments
Bridge Strengthening and Replacement    
A71/280 C80 Mathews Burn Culvert
West Donnington St,
Darvel
Slab Replacement £250,000 Internal design ongoing.
U751/10 Crossflats Bridge Replacement £40,000 Awarded to consultant to design replacement.
Temporary bridge will be required during the works.
U760/00 C93 Glenhead Bridge Replacement £60,000 Internal design ongoing, near tender ready.
U740/10 Barbieston Bridge Replacement £60,000 SAC leading design. Award to consultant.
Road Slips  
B713 South of Sorn  £400,000 Works ongoing. Programmed completion 4th July 25.
B741 Coal Glen Embankment Slip Remediation Works £690,000 Discussions ongoing with contractor and SPEN.
U13 Aitket Road Slip Remediation Works £500,000 Near tender ready. Site clearance complete.
A713/60 C61 Polnessan Upper Bridge Culvert Extension £500,000 Detailed design ongoing.
Upgrade Works Identified from Inspections  
B705/10 C91 Cowan Place Culvert Part Replacement/Scour
Repairs
£60,000 Near tender ready.
A70/130
W31
Thornwood Wall, Lugar Replacement £500,000 Near tender ready. Discussion regarding requirement for
road closure ongoing.
A736/60 C84 Lochridge Culvert Masonry and Drainage
Repairs
£70,000 Near tender ready.
A71 Riccarton Viaduct Refurbish - expansion joint
removal/replacement
£100,000 Design ongoing to replace 1 failing expansion joint with
asphaltic plug joints. Works to be carried out ASAP.
113

Page 114

Official
A71 River Irvine Bridge Refurbish - expansion joint
removal/replacement 
Design ongoing to replace 1 failing expansion joint with
asphaltic plug joints. Works to be carried out ASAP.
C85/10 Fenwick Bridge Masonry Refurbishment £40,000 Award to consultant to progress with assessment and
detailed design.
U729/00 C64 Hayholm Bridge Masonry and Scour Repairs £60,000 Internal design ongoing.
C95/10 Furnace Road Bridge Arch Stregthening £100,000 Awaiting PI report from consultant. Internal design
ongoing.
Parapet Upgrades  
A70/110 Causeyhead Bridge Parapet Repairs £60,000 Discussions ongoing regarding options to reduce
disruption at Dumfries House.
A736/50 Bloak Road Bridge Parapet Repairs £30,000 NAC/EAC boundary, EAC progressing design.
Other  
Various Investigative Works Topographical Survey, Paint
Inspection etc
£8,000 Annual cost of surveys/inspections. 
Principal Inspection Consultant Fees £100,000 Consultant fees for 24/25 PI’s
Various Low Bridge Signage  Sign Upgrades £40,000 Upgrades to signage at 6 bridges with low head room. 
Ayrshire Roads Alliance - Traffic, Transportation and Road Safety Programmes 2025/26
Funding Source Project
ID
Location Project Description Detail Progress Allocation
EAC Capital Road Safety
Budget: £200,000
(£198,000 Road Safety +
£2,000 Safer Neigh.)
22.23 A71 / Campbell Street
Off Slip, Kilmarnock
Junction
signalisation
Installation of new
traffic signals, stopping
up of Willock Street
and new carriageway
layout to improve
capacity
Final junction
designs from
traffic lights
contractor still
pending.
Implementation
pushed back to
Jul/Aug 25.
£105,000
114

Page 115

Official
22.50 B741 Dalmellington to
New Cumnock
Road safety
review
General route review
to identify safety
measures
Driven survey
along rural
section to be
completed.
Ongoing. 
£2,000
22.38 Glaisnock Street,
Cumnock
Traffic calming Speed
reduction/traffic
calming measures
Design works
started - Late
25/26 for
completion
£15,000
22.15 VAS signs, various
location
Upgrades and
new installations
New contract to be
implemented
In progress £10,000
23.09 B769 Kingsford Speed limit and
traffic calming
Appraisal Late 25 for
construction
works
£25,000
24.05 Various Traffic calming Speed surveys Ongoing £10,000
25.03
/
25.16
Various Road safety
improvements
HFS Schemes Ongoing £33,000
Road Safety
Improvement Fund
Budget: £300,000 (TBC)      
24.20 B751 - Kilmaurs to
Fenwick 
Route Review General route review,
VAS improvements,
Road Markings and
Signage, Studs
Ongoing design
works with
Construction
expected Sept 25
£125,000
25.11 A71 – Priestland Safer system
improvements
Vehicle restraint
barriers
Design work
ongoing with
Construction
expected early 26
£75,000
25.13 Waterside Road Safety
improvements
VAS improvements ,
HFS and carriageway
studs
Design work
ongoing with
Construction
expected early 26
£50,000
25.17 A70 – Dumfries House Road Safety
improvements
VAS improvements ,
HFS and carriageway
studs
Design work
ongoing with
Construction
expected early 26
£50,000
Rural Route Action Plans
Budget: £359,000
£134,000 (EAC) + £225,000
(Dev. Contributions)
22.08 B778 Stewarton to
Fenwick
Road alignment
improvements at
three key
locations
Agreement to proceed
with site 1
improvements
Process started £359,000
115

Page 116

Official
Tier 1
Budget: £758,000 
22.13 Grougar Road,
Crookedholm
Pedestrian
crossing and road
widening
Installation of new
crossing and layby
Start date
pushed back to
Spring 25
£90,000
23.07 Strawberrybank Road,
Kilmarnock
Pedestrian
crossing
Appraisal for new
crossing point
Ped counts low
so project
reduced to
consideration of
ped refuge island
£10,000
23.10 St Germain Street,
Catrine
Pedestrian safety
improvements
Installation of bollards
and TRO
In progress £10,000
N/A Kilmarnock Green
Infinity Loop
Cycling
Infrastructure
Route 1 & 2, Sturrock
St and MSCP
Route 1 & 2
design placed on
hold due to lack
of funding, MSCP
site
redevelopment
application
submitted to
ATIF 2025/26.
Sturrock St
modelling
completed.
£100,000
24.18 A759 West of
Gatehead
Pedestrian
improvements
Footway designs and
build out
Design work
ongoing with
Construction
expected early 26
£30,000
25.15 B751 Pedestrian
improvements
Footway
improvements
Design work
ongoing with
Construction
expected early 26
£30,000
24.28 Kilmarnock Pedestrian
improvements
Footway designs and
buildouts
Onsite
consultation to
be completed
prior to design
work with
Construction
expected early 26
£30,000
23.12 A713 Traffic calming 1 x speed table Construction
expected June 25
£10,000
116

Page 117

Official 
Appendix 3 
Ayrshire Roads Alliance - EV Public Chargers 
EAST AYRSHIRE 
CPS ID Type Make Location
51171 7kw eVolt Queens Street Car Park, Queen Street, Kilmarnock, KA1 1LU
50821 22kw eVolt Foregate Noth Car Park, Kilmarnock, KA1 1LU
51324 22kw eVolt Titchfield Street Car Park, Kilmarnock, KA1 1PH
52474 22kw eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52470 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52471 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
25.12 A71 Priestland Traffic Calming and
pedestrian crossing
Design work
ongoing with
Construction
expected early 26
£50,000 
Irvine Road Kilmaurs Pedestrian
improvements
Design work
ongoing with
Construction
expected late 25
£35,000 
Various location Various Unallocated  £363,000
EAC Bus Infrastructure
Budget: £40,000
22.51 Onthank Terminus,
Kilmarnock
Upgrades to
existing
infrastructure
Improve crossing and
boarding points
Drawings
complete to be
paired with
Stewarton
Terminus 
£20,000
22.52 Stewarton Terminus,
Stewarton
Upgrades to
existing
infrastructure
Improve turning circle
and boarding points
Design stage in
progress
£20,000
EAC Active Travel
Budget £50,000
24.03 School Streets
Programme
Introduction of
trial sites
Three further schools
to be trialled with
further trials to be
developed
Trials have
commenced at
Bellsbank and
Dalrymple.
Further sites to
progress.
£50,000
117

Page 118

Official
52472 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52473 Rapid eVolt Ayrshire Athletics Arena EV Hub, Queens Drive, Kilmarnock, KA1 1HU
52020 Rapid eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52021 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52022 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
52023 7kw eVolt East George Street Car Park, Kilmarnock, KA1 1GB
51233 22kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52035 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52036 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52037 7kw eVolt EAC Headquarters, London Road, Kilmarnock, KA3 7BU
52026 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52027 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52028 7kw eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
52025 Rapid eVolt Waterside Street Car Park, Kilmarnock, KA1 1RJ
50819 22kw eVolt Beechwood Avenue Car Park, Beechwood Avenue, Auchinleck, KA18 2AW
TBC Rapid eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
50507 22kw eVolt Avenue Square Car Park, Stewarton, KA3 5AP
60301 Rapid eVolt Castle Car Park, New Cumnock, KA18 4AR
52024 Rapid eVolt Ranouldcoup Road, Darvel, KA17 0JU
52042 Rapid eVolt Loudoun Street Car Park, Mauchline, KA5 5BE
52018 Rapid eVolt Tanyard Car Park, Cumnock, KA18 1BG
52034 22kw eVolt Glaisnock Street Car Park, Cumnock, KA18 1JS
52017 Rapid eVolt Mill Bank Car Park, Mill Bank, Cumnock, KA18 1AB
52039 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
52040 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
52041 7kw eVolt Townhead Street Car Park, Cumnock, KA18 1LY
51792 22kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52966 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52967 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52968 7kw eVolt Area Office, 33 Main Street, Dalmellington, KA6 7QL
52972 7kw eVolt Saint Germain Street Car Park, Catrine, KA5 6RQ
52969 22kw eVolt Dean Castle Country Park, Dean Road, Kilmarnock, KA3 1XB
52970 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ
118

Page 119

Official
52971 7kw eVolt Fenwick Road Car Park, Fenwick Road, Kilmaurs, KA3 2RQ
52953 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52954 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52955 7kw eVolt Northwest Area Centre, Western Road, Kilmarnock, KA3 1NQ
52956 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52957 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52958 7kw eVolt Rothesay House, Greenholm Road, Cumnock, KA18 1LH
52965 22kw eVolt Morton Place Car Park, Morton Place, Kilmarnock, KA1 2AY
53778 Rapid eVolt Main Street Car Park, Muirkirk
53775 22kw eVolt Rose Reilly Sports Centre, Stewarton
53776 7kw eVolt Standalane Car Park, Stewarton
60786 7kW eVolt Academy Street, Hurlford
60792 22kW eVolt Drongan Centre car park, Mill of Shield Road
51210 22kW eVolt Carnshalloch Avenue car park, Patna
60950 22kW eVolt New Cumnock Outdoor Swimming Pool car park
60954 22kW eVolt Gatehead Road car park, Crosshouse
61021 7kW eVolt East Ayrshire Community Hospital, Cumnock
61022 7kW eVolt East Ayrshire Community Hospital, Cumnock
61983 7kW eVolt Morton Place car park, Kilmarnock
61984 7kW eVolt Morton Place car park, Kilmarnock
61985 7kW eVolt Morton Place car park, Kilmarnock
62184 7kW eVolt Browns Road car park, Newmilns
61886 22kW eVolt Sturrock Street, Kilmarnock
62938 7kW eVolt New London Road car park, Kilmarnock
SOUTH AYRSHIRE
CPS ID Type Make Location
51930 7kw eVolt Barns Crescent Car Park, Ayr, KA7 2BW
51793 7kw eVolt Mill Brae Car Park, Ayr, KA7 2HU
TBC Rapid eVolt Burns Statue Square, Ayr, KA7 UT
52029 22kw eVolt Belleisle Park, Ayr, KA7 4BN
52030 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
52031 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
119

Page 120

Official
52032 7kw eVolt Castlehill Road Car Park, Ayr, KA7 2HT
51325 22kw eVolt Cromwell Road Car Park, Ayr, KA7 1DY
50818 22kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
50817 22kw eVolt Jubilee Road, Troon Swimming Pool, Troon, KA10 6XQ
50290 22kw eVolt South Beach Road Car Park, Troon, KA10 6EF
52033 22kw eVolt Girvan Harbour, Girvan, KA26 9AG
TBC Rapid eVolt Girvan Harbour, Girvan, KA26 9AG
52038 22kw eVolt Harbour Road Car Park, Maidens, KA26 9NR
52019 Rapid eVolt The Vennel, Ballantrae, KA26 0NH
52975 Rapid eVolt Mill Brae Car Park, Ayr, KA7 2HU
52974 7kw eVolt New Road Car Park, New Road, Ayr, KA8 8HE
52973 Rapid eVolt New Road Car Park, New Road, Ayr, KA8 8HE
52959 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52960 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52961 7kw eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
53555 Rapid eVolt Bellevue Car Park, Bellevue Road, Prestwick, KA9 1NW
52976 Rapid eVolt Coylton Activity Centre, Hole Road, Coylton, KA6 6JL
53774 Rapid eVolt Academy Street, Troon
53773 Rapid eVolt Lodge Road Car Park, Turnberry
53777 22kw eVolt Burnside Road, Monkton
60793 22kw eVolt Dailly Activity Centre, Victory Crescent, Dailly
60081 22kw eVolt Inches Close car park, Maybole
61982 22kw eVolt Tarbolton Community Campus car park, Tarbolton
61986 22kw eVolt Dundonald Primary School car park, Dundonald
60086 22kw eVolt Mossblown Activity Centre car park, Mossblown
60082 22kw eVolt Kirkoswald Main Street car park, Kirkoswald
61979 7kW eVolt Chalmers Arcade car park, Girvan
61980 7kW eVolt Chalmers Arcade car park, Girvan
61981 7kW eVolt Chalmers Arcade car park, Girvan
62000 22kW eVolt Barrhill Community car park, Main Street, Barrhill 
120

Page 121

Official
Appendix 4 South Ayrshire Ward Investment Programme 2025/26 
Roads Maintenance Unit
LOCATION Description PO Value  Cost to Date variance +/- Comment
Troon Emergency repairs to Troon Esplanade. £40,000.00  
Complete – Final measure
Troon Resurfacing of Troon Esplanade (Ph.2). £220,000.00   
Complete – Final measure
Prestwick Repair / renew steps to Boydfield Gardens    Measuring works up on
site
Ayr North Provision of Bike Shelter at Lochside Community Centre    With Procurement
Ayr East Glencairn Park – footpath upgrade    Feasibility study ongoing
Ayr East Car parking provision Peggieshill Road    Feasibility study ongoing
Ayr West  Promenade raised footway works   
Feasibility study ongoing
with Professional Design
Services
Kyle Annbank Park – upgrade footpath    Feasibility study ongoing
Kyle  Construction of new footpath on Southern edge of
Collenan reservoir, 
£22,000.00  Feasibility study ongoing
Design and Flooding Section
Troon  Shore Defence Structural Stabilisation £10,000.00   On site
Citadel Footbridge
Refurbishment
Remove and renew timber deck parapet elements. 
Surface prepare and paint.  Remove or repair lighting £140,000.00   Complete – Final measure
Girvan Boating Pond
Refurbishment 
Install new stainless steel reinforced concrete base slab to
reduce water leakage. £175,000.00 
Complete – Final measure
Dunure Castle
Footbridge
Replacement 
Replace existing small span concrete footbridge with a
larger footbridge with a view and good aesthetics    £230,000.00  Ongoing.
Lighting Section
Ayr East  Glencairn Park – Install footpath lighting    Measuring works up on
site
Ayr West New Bridge & Auld Brig.  Design fees for installation of
architectural floodlighting to structures £50,000.00   Design Fee 
121

Page 122

Official 
122

Page 123

East Ayrshire Council 
AYRSHIRE SHARED SERVICES JOINT COMMITTEE
6 June 2025 
Report by the Head of Ayrshire Roads Alliance 
DEVELOPMENT CONTROL UPDATE - ROAD BONDS 
Purpose of report 
1. The purpose of this Report is to update the Joint Committee on the current
position regarding road bonds held by the Ayrshire Roads Alliance on behalf of
East Ayrshire and South Ayrshire Councils. 
Recommendations 
2. It is recommended that the Joint Committee: 
(i) Notes the position regarding road bonds currently held by the Ayrshire
Roads Alliance on behalf of East Ayrshire Council and South Ayrshire
Council; 
(ii) Agrees that progress updates are provided to future meetings of the
Joint Committee on an annual basis; 
(iii) Otherwise, notes the content of this report. 
Background 
3. The Roads (Scotland) Act 1984 requires that, for any road not constructed by a
roads authority, the appropriate consent from the local roads authority is
obtained to undertake this work.  This is generally referred to as the Road
Construction Consent (RCC).  The Ayrshire Roads Alliance maintains a register
of all RCCs under the remit of the Ayrshire Roads Alliance. 
4. Where new roads are being constructed for private housing, the developers are
required to provide the roads authority with security to cover the cost of
constructing the roads should the developer default.  The provisions are set out
in the Security for Private Road Works (Scotland) Regulations 1985, as
amended.  This security may take the form of a cash deposit, but it is generally
in the form of a road bond.  The security is retained by the Roads Authority until
completion of the consented works, although the value may be reduced as the
works progress. Road bonds are not required for local authority or housing
association developments.
Agenda Item 8
123

Page 124

5. The Joint Committee, at its meeting on 23 May 2014, remitted the Head of
Roads to undertake a review of road bonds more than three years old and
report to a future meeting of the Joint Committee. An annual report is now
presented to the Joint Committee summarising the road bond position and
providing other updates on the development control process as required. 
Current Residential Bonds 
6. A list of all RCCs and their associated road bonds for each Council area is
shown in Appendix 1.  As of 23 May 2025, ARA manages 33 road bonds with a
current value of £10,549,846 in East Ayrshire, and 27 road bonds with a current
value of £3,129,149 in South Ayrshire. 
7. Appendix 2 provides details of completed road bonds and road adoptions since
the previous report to Joint Committee on 6 September 2024, and Appendix 3
shows new bonds received since the previous report. 
8. The current review has found that the value of the road bonds held in Appendix
1 is adequate to complete the outstanding road works on each development
site across both East Ayrshire and South Ayrshire for which RCC has been
issued. 
Construction Taking Place Without RCC and Road Bonds 
9. There are no developments being constructed within either East Ayrshire
Council or South Ayrshire Council areas without an RCC and Road Bond in
place. 
Other Development Matters 
Corton, Ayr – Allanvale Residential 
10. Allanvale Residential have previously submitted a total of nine RCC
applications, eight for the Corton development in Ayr and one for Auchincruive.
None of the nine RCCs are listed in Appendix 1 as consent has yet to be
issued. Six of the Allanvale RCC applications have been reviewed by the ARA,
with subsequent requests for road bonds totalling £3.3 million and associated
inspection fees of £120,000 issued in June 2020, inspection fees have been
received. In accordance with ARA procedures, RCC will not be granted until the
road bonds are lodged with the Council. The remaining three RCC applications
(not yet reviewed by the ARA) involve a further £4.5 million in road bonds and
£175,000 in inspection fees, however these have yet to be requested. It should
be noted that no development is currently taking place associated with any of
the nine RCC applications, and therefore there is no breach of the regulations. 
Bonds Called-In 
11. In the EAC area the ARA are in the process of calling in a Road Bond
associated with a site in Galston where the owner of the development company
has passed away. The bonds being called in are as follows:
• EAC/CC/02/007 – Manse Gardens, Galston: £110,270;
The bonds listed above are sufficient in value to cover the cost of completing
the outstanding works, with ARA currently undertaking a final measure of
works.
124

Page 125

12. In the SAC area the ARA are in the process of calling in a total of three Road
Bonds associated with sites in development by Stewart Milne, who have cone
into receivership. All three bonds are associated with RCC consents in their
maintenance period, and ARA will complete the required snagging works to
allow the associated development roads to be formally adopted. The bonds
being called in are as follows:
• SAC/133/05/12 – NE Troon Phase 1, Troon: £94,400;
• SAC/135/07/12 – NE Troon Housing 1, Troon - £123,402;
• SAC/162/01/18 – NE Troon, Phase 4 - £75,187
The bonds listed above are sufficient in value to cover the cost of snagging
works to Council, with ARA officers currently finalising a bill of quantities
associated with the outstanding snagging items. 
Non-Residential Road Bonds 
13. Roads authorities have a general power under section 96 of the Roads
(Scotland) Act 1984 to recover maintenance costs arising from damage caused
by excessively heavy, or other extraordinary, vehicles or traffic. The type of
development where this applies are Wind Farms or major infrastructure
projects. 
14. The status of non-residential bonds and financial guarantees is set out in the
table below. In each case the bond value held has been assessed as being
sufficient to cover the cost of potential works arising from extraordinary damage
to roads infrastructure. 
15. The Greenburn OCC is in its restoration phase and work on the reinstatement
of the U720 road and use of the haul road bridge as part of the realigned public
road is now complete and the road has been reopened to traffic. Formal
adoption of the new section of road and the bridge has still to be concluded. 
Council Area Site Developer Agreement Bond Value
East Ayrshire Greenburn
Open Cast
Coal
Keir Mining Parent
Company
Guarantee
£0.025M
East Ayrshire Afton Wind
Farm
Afton Wind
Farm Ltd
Section 96 of
Roads
(Scotland) Act
£1.150M
South
Ayrshire
Assel Valley
Wind Farm
Assel Valley
Wind Energy
Ltd
Section 96 of
Roads
(Scotland) Act
£0.107M 
Implications 
Implications  Yes  No
Paragraph
number in
report
1. Policy/Strategic Planning  X 16
2. Governance X  17
3. Human Resources  X 18
4. Equality and Fairer Scotland Duty  X 19
5. Financial X  20
125

Page 126

6. Risk X  21
7. Community Wealth Building X  22
8. Net Zero  X 23 
Policy/strategic planning implications 
16. None. 
Governance implications 
17. The work to manage RCCs and road bonds is carried out in accordance with the
Roads (Scotland) Act 1984 and its associated statutory instruments. 
Human resources implications 
18. The management of the development control function and continued review of road
bonds will be undertaken within existing staff resources. 
Equality impact and Fairer Scotland duty implications 
19. None. 
Financial implications 
20. The road bonds currently held by the Alliance on behalf of both East Ayrshire
Council and South Ayrshire Council are sufficient to complete the outstanding
roadworks on each development site for which RCC has been issued.   
Risk implications 
21. Inadequate road bond values expose the roads authority to a potential financial
shortfall if the roadworks have to be completed by them should the developer
default.  An RCC is valid for three years and the developer may ask the roads
authority for an extension if the site is incomplete after this period.  The value of
road bonds that are more than three years old will therefore continue to be
reviewed to determine their adequacy to complete the outstanding works required
to comply with the RCC. Where a shortfall is identified the developer will be advised
to increase the value of the road bond held when an application is made for an
extension to the RCC. 
Community Wealth Building implications 
22. New Development provides economic levers to develop resilient, inclusive local
economies with more local spend and fair employment, as well as ensuring that
wealth is more locally owned and benefits local people. 
126

Page 127

Net zero implications 
23. None. 
Appendices 
Appendix 1 - Register of Road Bonds Held at 23 May 2025
Appendix 2 - Completed Road Bonds and Road Adoptions since September 2024
Appendix 3 - New Bonds received since September 2024 
Background papers 
Development Control Update - Road Bonds - 23 May 2014
Development Control Update - Road Bonds - 21 August 2014
Development Control Update - Road Bonds - 6 November 2015
Development Control Update - Road Bonds - 17 February 2017
Development Control Update - Road Bonds - 16 February 2018
Development Control Update - Road Bonds - 25 April 2019
Non-Residential Road Bonds - 29 August 2019
Development Control Update - Road Bonds – 4 June 2021
Development Control Update - Road Bonds – 10 June 2022
Development Control Update – Road Bonds – 01 September 2023
Development Control Update – Road Bonds – 06 September 2024 
Person to contact 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No.   01563 503164
E-mail:   jane.corrie@ayrshireroadsalliance.org 
Implementation Officer 
Jane Corrie, Head of Roads - Ayrshire Roads Alliance 
Tel No.   01563 503164
E-mail:   jane.corrie@ayrshireroadsalliance.org 
127

Page 128

Appendix 1 - Road Bonds Held at 23 May 2025 
East Ayrshire 
RCC Ref Developer Site Bond Provider Original Bond
Value
Current Bond
Value Status
EAC/CC/02/007
EXT
KG Building and
Civil Eng Ltd
Manse Gardens,
Brewlands Street,
Galston
NHBC £110,270 £110,270 Bond called in - currently undertaking final measure.
EAC/CC/08/013 McTaggart
Construction Ltd
Dunlop House,
Dunlop
MD Insurance
Services Ltd £353,682 £353,682 Site currently abandoned. Awaiting new application from
developer, Bond remains unchanged.
EAC/CC/16/004
Mooncatcher
Ltd/Campbell
Homes
Rigg Road,
Cumnock, Phase 1 Cash Deposit £193,844 £168,830
Site currently being developed. Remaining cash bond of
£168,830 from EAC/CC/16/004 covers outstanding value
of roadworks for Phases 1 – 4. Site Completion
Estimated June 25.
EAC/CC/16/009 ARH Homes Ltd Riverside Gardens,
Cronberry Cash Deposit £130,929 £66,860 Site on going. 
EAC/CC/17/003
EXT PHASES
1&2
Auberne Homes
Former Holmhead
hospital site,
Cumnock, Phases
1&2
Acasta European £145,818.50 £29,164 Site completed, on maintenance period since 01/08/23.
Lighting remedial work required before full adoption.
EAC/CC/18/010 Mooncatcher/
Campbell Homes
Rigg Road,
Cumnock, Phase 2 Cash Deposit £58,404 See status
Site currently being developed. Remaining cash bond of
£168,830 from EAC/CC/16/004 covers outstanding value
of roadworks for Phases 1 – 4. Site completion estimated
June 25.
EAC/CC/18/013 Valley Homes
(Scotland) Ltd
John Street,
Catrine, Phase 1A Cash Deposit £29,641 £2,964.11 Site completed, on maintenance period since 06/03/24.
Adoption paperwork to be processed.
EAC/CC/18/015
Phase 1
Auberne
Homes/Viga Homes
Main Street,
Auchinleck (Phase
1)
Acasta International £55,498 £55,498
Site currently being developed. Bond total for Phase 1 &
2 £110,996. Roadworks to be completed Oct 2024 Road
bond will be reduced thereafter to 90%. Developer given
final opportunity to complete works by June 25.
EAC/CC/18/015
Phase 2
Auberne
Homes/Viga Homes
Main Street,
Auchinleck (Phase
2)
Acasta International £55,498 £55,498
Site currently being developed. Bond total for Phase 1 &
2 £110,996. Roadworks to be completed Oct 2024 Road
bond will be reduced thereafter to 90%. Developer given
final opportunity to complete works by June 25.
EAC/CC/19/003 Campbell Homes Rigg Road,
Cumnock, Phase 3 Cash Deposit £81,401 See status
Site currently being developed. Remaining cash bond of
£168,830 from EAC/CC/16/004 covers outstanding value
of roadworks for Phases 1 – 4. Site completion estimated
June 25.
128

Page 129

EAC/CC/19/005 Campbell Homes Rigg Road,
Cumnock, Phase 4 Cash Deposit £49,718 See status
Site currently being developed. Remaining cash bond of
£168,830 from EAC/CC/16/004 covers outstanding value
of roadworks for Phases 1 – 4. Site completion estimated
June 25.
EAC/CC/19/013 Campbell Homes Rigg Road,
Cumnock, Phase 5 Cash Deposit £65,114.84 £65,114.84
Site currently being developed. LODGED AS CASH
BOND 5,6&7 TOTAL £170,807.79. Site completion
estimated June 25.
EAC/CC/21/005 Campbell Homes Rigg Road,
Cumnock, Phase 6 Cash Deposit £61,114.61 £61,114.61
Site currently being developed. LODGED AS CASH
BOND 5,6&7 TOTAL £170,807.79. Site completion
estimated June 25.
EAC/CC/21/006 Campbell Homes Rigg Road,
Cumnock, Phase 7 Cash Deposit £44,578.34 £44,578.34
Site currently being developed. LODGED AS CASH
BOND 5,6&7 TOTAL £170,807.79. Site completion
estimated June 25.
EAC/CC/21/009 Campbell Homes Rigg Road,
Cumnock, Phase 8 Cash Deposit £99,888.44 99,888.44 Site currently being developed. Site completion
estimated June 25.
EAC/CC/22/008 Campbell Homes Rigg Road,
Cumnock.  Phase 9 Cash Deposit As per Ph 1> Ph 8 As per Ph 1> Ph 8
Site currently being developed. Cash Bond for Ph 1 > Ph
8 now covers Ph 9 > Ph 11 also. Site completion
estimated June 25.
EAC/CC/23/001 Campbell Homes
Rigg Road,
Cumnock.  Phase
10
Cash Deposit As per Ph 1> Ph 8 As per Ph 1> Ph 8
Site currently being developed. Cash Bond for Ph 1 > Ph
8 now covers Ph 9 > Ph 11 also. Site completion
estimated June 25.
EAC/CC/23/002 Campbell Homes
Rigg Road,
Cumnock.  Phase
11
Cash Deposit As per Ph 1> Ph 8 As per Ph 1> Ph 8
Site currently being developed. Cash Bond for Ph 1 > Ph
8 now covers Ph 9 > Ph 11 also. Site completion
estimated June 25.
EAC/CC/19/009 Bellway Homes Ltd
Fardalehill,
Kilmarnock, Phase
3
NHBC £1,018,084.00 £101,808.38 Site currently being developed. Bond reduced to 10% on
12/06/2023.
EAC/CC/22/005 Bellway Homes Fardalehill Phase 4 HCC International £768,653.35 £768,653.35 Site currently being developed.
EAC/CC/22/010 Bellway Homes Fardalehill Phase 6 HCC International £2,814,044.00 £2,814,044.00 Site currently being developed.
EAC/CC/20/001 Kukoon Homes Thorntoun Estate,
Crosshouse
Casualty and
General Insurance £181,388.00 £181,388.00 Work ongoing
EAC/CC/20/002
Phases 1 - 4
Hayhill
Developments
Hillhead Road,
Mauchline, Phases
1 - 4
Cash Deposit £656,704.71 £6,567.05
Site completed, on maintenance period since 02/08/23.
Site on further maintenance period due to failed
manholes.
EAC/20/004B Murdoch Properties
Glebe Road,
Galston. Phase 2,
North, Road 2.
(Adoptable)
Cash Deposit £44,215.84 £44,215.84
Site currently going through process to be added to
maintenance period. If successful bond will be reduced to
the 10%
EAC/CC/20/007 Avant Homes
(Scotland)
Loudoun Street,
Draffen, Stewarton NHBC £2,125,456 £1,062,728 Site currently being developed
EAC/CC/21/003 Milestone Homes BALLOCHMYLE, Evolution Insurance £85,092.00 £8,509.20 Site complete. Adoption paperwork to be processed.
129

Page 130

PHASE 3
EAC/CC/21/011 J. Campbell, New
Cumnock
Muirkirk Road,
Lugar AVIVA £108,370.21 £10,837.02 Site completed, on maintenance period since 05/04/23.
Adoption paperwork to be processed.
EAC/CC/21/007 Miller Homes Ltd Irvine Road,
Kilmaurs NHBC £1,743,070.61 £174,307.06 Maintenance period commenced 27/06/24. 
EAC/CC/22/004 Barratt Homes Northcraigs Spine
Road, Kilmarnock NHBC £1,115,089.00 £557,544.50 Work ongoing – bond reduced to 50% (£557,544.50)
EAC/CC/23/004 Barratt Homes Northcraigs Phase
1, Kilmarnock NHBC £1,695,800.00 £847,900.00 Work ongoing – bond reduced to 50% (£847,900.00)
EAC/CC/23/009 Bellway Homes Dumfries Drive,
Kilmarnock NHBC £1,169,078.39 £1,169,078.39 Work Ongoing
EAC/CC/24/003 Taylor Wimpey
West
Northcraigs
Wimpey NHBC £1,660,961.16 £1,660,961.16 Work Ongoing
EAC/CC/25/001 Advanced
Construction Dareduff Quarry Cash Deposit £27,841.38 £27,841.38 Work Ongoing 
130

Page 131

South Ayrshire 
RCC Ref Developer Site Bond Provider Original Bond
Value
Current Bond
Value Status
SAC/133/05/12 Stewart Milne NE Troon Phase 1,
Troon NHBC £849,603.00 £94,400.00 Bond in the process of being called in to allow snagging
works to be completed (site was in maintenance period)
SAC/135/07/12 Stewart Milne NE Troon Housing
1, Troon NHBC £1,110,614.00 £123,402.00 Bond in the process of being called in to allow snagging
works to be completed (site was in maintenance period)
SAC/162/01/18 Stewart Milne N E Troon, Phase 4 NHBC £676,681.87 £75,187.00 Bond in the process of being called in to allow snagging
works to be completed (site was in maintenance period)
SAC/134/06/12 Taylor Wimpey
N E Troon
Distributor Road,
Phase 2A
NHBC £576,486.63 £57,649.00 In maintenance period from 20/12/24
SAC/166/05/18 Taylor Wimpey
N E Troon
Distributor Road,
Phase 2B
NHBC £576,486,63 £57,649.00 In maintenance period from 20/12/24
SAC/167/06/18 Taylor Wimpey
N E Troon
Distributor Road,
Phase 2C
NHBC £576,486,63 £57,649.00 In maintenance period from 20/12/24
SAC/161/04/17 Taylor Wimpey N E Troon, Phase 3 NHBC £584,889.22 £58,489.00 In maintenance period from 20/12/24
SAC/168/07/18 Taylor Wimpey N E Troon, Phase 5 NHBC £346,121.63 £34,612.00 In maintenance period from 20/12/24
SAC/176/01/20 Taylor Wimpey N E Troon phase 6 NHBC £329,369.00 £32,937.00 In maintenance period from 20/12/24
SAC//187/12/20 Taylor Wimpey N E Troon, Phase 7 NHBC £395,682.75 £197,841.00 Work ongoing
SAC/192/17/20 Taylor Wimpey N E Troon, phase 8 NHBC £797,174.00 £79,717.00 In maintenance period from 20/12/24
SAC/138/03/14 Bellway Homes Ltd  Kilmarnock Road,
Brassie NHBC £508,825.00 £56,536.00 In maintenance period 
SAC/147/04/15 Bellway Homes Ltd  Kilmarnock Road,
Phase 2, Troon NHBC £424,252.00 £47,139.00 In maintenance period
SAC/142/06/14 Mactaggart &
Mickel 
Greenan, Phase II,
Ayr NHBC £1,970,572.00 £197,057.20 In maintenance period
SAC/163/02/18 Mactaggart &
Mickel
Greenan, Ayr
Phase 3 NHBC £67,181.00 £67,181.00 Work ongoing
SAC/193/01/21 Mactaggart &
Mickel Greenan, Phase 4 NHBC £661,142.00 £66,114.19 In maintenance period
SAC171/02/19 Cala Homes Greenan Phase 6 NHBC £963,940.94 £96,394.00 In maintenance period
SAC/199/07/21 Cala Homes Greenan, Phase 8 NHBC £372,104.00 £37,210.00 In maintenance period
SAC/159/02/17 Mactaggart &
Mickel
Townend Brae,
Symington Phase 3 NHBC £610,581.00 £30,529.00 In maintenance period
131

Page 132

SAC/170/01/19 Milestone
Developments
West Parish,
Maybole Cash Deposit £10,933.00 £10,933.00 Work ongoing
SAC/175/06/19 Westpoint Homes Seafield Hospital NHBC £577,447.62 £57,744.76 In maintenance period
SAC/177/02/20 Persimmon Homes Tarbolton Road,
Monkton, Phase 1 NHBC £509,382.85 £509,382.00 Work ongoing – Appendix 1 issued 
SAC/178/03/20 Persimmon Homes Tarbolton Road,
Monkton phase 2 NHBC £707,634.85 £707,634.00 Work ongoing – Appendix 1 issued
SAC/201/09/21 Persimmon Homes Monkton, Phase 6 NHBC £432,257.00 £216,128.00 Work ongoing
SAC/194/02/21 Milestone
Developments
Tunnoch Farm,
Phase 1B Evo Surety £540,000.00 £54,000.00 In maintenance period
SAC/194/02/21 Milestone
Developments
Tunnoch Farm,
Phase 1B Evo Surety £540,000.00 £54,000.00 In maintenance period
SAC/206/01/22 Milestone
Developments
Tunnoch Farm
Phase 2 Evo Surety £516,249.00 £51,634.90 In maintenance period from 28/11/24 
132

Page 133

Appendix 2 - Completed Road Bonds and Road Adoptions since September 2024 
East Ayrshire 
RCC Ref Developer Site Bond Release Date Adoption Date Comments
EAC/CC/15/003 Murdoch Property
Development Ladeside, Newmilns 07/02/2025 07/02/2025 None
EAC/CC/20/006 Glencairn Estates One Recreation Road,
Cumnock 14/08/2023 07/02/2025 None
EAC/CC/21/001 Milestone Homes BALLOCHMYLE,
PHASE 1 12/06/2024 12/06/2024 None
EAC/CC/16/003
Phase 1 Persimmon Homes Dunlop Road,
Stewarton, Phase 1 08/10/2024 08/10/2024 None
EAC/CC/16/003
Phase 2 Persimmon Homes Dunlop Road,
Stewarton, Phase 2 08/10/2024 08/10/2024 None
EAC/CC/16/003
Phase 3  Persimmon Homes Dunlop Road,
Stewarton, Phase 3 08/10/2024 08/10/2024 None
EAC/CC/16/003
Phase 4 Persimmon Homes Dunlop Road,
Stewarton, Phase 4 08/10/2024 08/10/2024 None
EAC/CC/16/003
Phase 5 Persimmon Homes Dunlop Road,
Stewarton, Phase 5 08/10/2024 08/10/2024 None
EAC/CC/17/008 Barratt Homes Northcraigs,
Kilmarnock, 29/01/2025 29/01/2025
Note: this covers a separate section of development road
separate section to that covered by EAC/CC/23/004 (in Appendix
1)
EAC/CC/19/008 Barratt Homes West
Former Kilmarnock
College, Holehouse
Road, Kilmarnock
29/01/2025 29/01/2025 None 
South Ayrshire 
RCC Ref Developer Site Bond Release Date Adoption Date Comments
SAC/158/01/17 Tom Bennet/Hiltech
Design
Culzean Road,
Maybole 17/02/2021 17/02/2021 Site was adopted some time ago, but was incorrectly shown as
live in previous report 
133

Page 134

Appendix 3 - New Bonds received since September 2024 
East Ayrshire 
RCC Ref Developer Site Bond Provider Bond Value Status
N/A     No new bonds received since September
2024 for EAC sites; however, several are
currently being processed and will require
road bonds/cash bonds to be in place prior to
the issue of RCC consent. 
South Ayrshire 
RCC Ref Developer Site Bond Provider Bond Value Status
N/A     No new bonds received since September
2024 for SAC sites; however, several are
currently being processed and will require
road bonds/cash bonds to be in place prior to
the issue of RCC consent. 
End.