Ayrshire Economic Partnership Board
A Special Meeting of the Ayrshire Economic Partnership Board of North Ayrshire
Council will be held remotely on Monday, 18 September 2023 at 10:00 to consider
the undernoted business.
Meeting Arrangements ­ Fully Remote 
This meeting will be held remotely in accordance with the provisions of 
the Local Government (Scotland) Act 2003.  Where possible, the meeting
will be live­streamed and available to view at https://north­ayrshire.public­
i.tv/core/portal/home.  In the event that live­streaming is not possible, a 
recording of the meeting will instead be available to view at this location.
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Ayrshire Regional Economic Strategy Delivery Plan
Submit report by the Executive Director, Place (North Ayrshire Council) 
requesting the Partnership Board to: (a) endorse the draft Year One 
Delivery Plan provided at Appendix One to the report; (b) agree to the 
submission of the Delivery Plan to the Ayrshire Economic Joint 
Committee for approval; and (c) receive further reports for future years of 
the Delivery Plan (copy enclosed).
Webcasting
Please note: this meeting may be filmed/recorded/live­streamed to the
Council's internet site and available to view at https://north­ayrshire.public­
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live­streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for  webcasting  or  training  purposes  and  for  the  purpose  of  keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the meeting. 
This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north­ayrshire.gov.uk.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Ayrshire Economic Partnership Board Sederunt
North Ayrshire Council
Councillor Marie Burns
Councillor Joe Cullinane
Councillor Anthony Gurney
Craig Hatton
Russell McCutcheon
Neale McIlvanney
Louise Kirk
 
East Ayrshire Council
Councillor Douglas Reid
Councillor Iain Linton
Councillor Maureen McKay
Councillor Stephen Canning (sub)
Councillor Barry Douglas (sub)
Councillor William Lennox (sub)
Eddie Fraser
David McDowall
Graham Saunders
 
South Ayrshire Council
Councillor Martin Dowey
Councillor William Grant
Councillor Bob Pollock
George Hunter
Theo Leijser
Eileen Howat
 
Others
Simon Fraser, Spirit Aerosystems
Derek McCrindle, Scottish Enterprise
Angela Cox, Ayrshire College
Paul Zealey, Skills Development Scotland
Claire Baird, Ayrshire Chamber of Commerce
Alastair Dobson, Taste of Arran
Gillian Docherty, University of Strathclyde
Morag Goodfellow, Highland and Islands Enterprise
Craig Hume, Utopia Computer
Rachel Phillips, Scottish Government
Christine Johnstone, Scottish Government
Kevin Kane, Strathclyde University
Hisashi Kuboyama, Federation of Small Businesses
Johnny Mone, University of West of Scotland
Chair:
Apologies:
Attending:
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Milan Radosavljevic, University of West of Scotland
Malcolm Roughead, Visit Scotland
Ian Welsh, Third Sector
 
4

Page 5

NORTH AYRSHIRE COUNCIL 
18 September 2023 
Ayrshire Economic Partnership Board 
Title:    Ayrshire Regional Economic Strategy Delivery Plan 
Purpose:  The purpose of this report is to present the draft Year One
Ayrshire Regional Economic Strategy Delivery Plan for
endorsement and to seek authorisation for submission to the
Ayrshire Economic Partnership Board. 
Recommendation:  That the Partnership Board: 
a) Endorses the draft Year One Delivery Plan provided at
Appendix One; 
b) Agrees to the submission of the Delivery Plan to the Ayrshire
Economic Joint Committee for approval; and 
c) Agrees to receive further reports for future years of the
Delivery Plan. 
1. Executive Summary 
1.1 The Ayrshire Economic Joint Committee approved the Ayrshire Regional Economic
Strategy on 20 February 2023. The Regional Strategy Working Group has developed
an accompanying draft Year One Delivery Plan. This report seeks the Partnership
Board’s endorsement of the draft Plan and authorisation for submission to the Ayrshire
Economic Partnership Board for approval. 
2. Background 
2.1  The Ayrshire Regional Economic Strategy (RES) was approved by the Joint
Committee on 20 February 2023. Formally launched on 19 June 2023, the Strategy
was developed by the industry-led Regional Economic Strategy Working Group and
identifies the vision of building wealth for everyone in Ayrshire by 2033. 
2.2 The Strategy was informed by engagement with a wide range of stakeholders
including private and third sector enterprises, and young people. The Working Group
built on this engagement to inform the development of the accompanying draft
Delivery Plan for which this report seeks endorsement and authorisation to submit to
the Ayrshire Economic Joint Committee for approval. This has included workshops led
by the Centre for Local Economic Strategies (CLES) and Ayrshire Chamber of
Commerce to engage with local enterprises and Third Sector and partner
organisations. The Working Group has also been supported by the Economic
Recovery Group.
Agenda Item 2
5

Page 6

2.3 The draft Delivery Plan focuses on actions that can feasibly be commenced and/or
delivered in Year One, 2023/24. It recognises the substantial level of activity already
underway which aligns with the priorities of the RES including projects delivered by
the Ayrshire Growth Deal and the pioneering work of the Ayrshire Community Wealth
Building Commission. It seeks to build on existing work, add value and align to the
RES priority themes, in addition to identifying new activity targeted to achieving the
strategy’s long-term ambitious priorities. 
2.4 The draft Delivery Plan provided at Appendix One outlines the range of proposed
actions in Year One. These are aligned to the six priority themes, with the Working
Group prioritising the action under the first three themes for delivery in Year One: 
• Support for Enterprise
• Fair Work
• Innovation
• Good Health and Wellbeing
• Stronger Places and Communities
• Enhancing Natural Capital 
2.5 The priority theme actions are complemented and supported by actions under the
Culture of Delivery theme, which will directly support delivery of the RES, alongside
Cross-Cutting Actions under the themes of Community Wealth Building, Skills and
Digital. Key sub actions, links to the priority outcomes, links to other priorities, key
delivery partners and timescales are provided for each action. The actions also
identify where external funding and resources are required to support delivery. 
2.6 Year 1 delivery also seeks to inform and develop medium- and longer-term actions
under all six priority themes. A mapping exercise across all the themes aims to
determine existing activity, reduce the potential for duplication and ensure a
coordinated approach to delivery. The output from this will inform the development of
future years’ actions. 
2.7 The draft actions propose the formation of an Ayrshire Regional Economic Strategy
Delivery Group with representation from local enterprises, NHS Ayrshire and Arran
and the Third Sector. This approach aims to build on the progress made by the
Working Group whilst broadening representation. Other key actions include the
creation of a dedicated website to host the strategy alongside information on
enterprise support, Ayrshire Growth Deal delivery and implementation of the RES. 
2.8 The Scottish Government is currently exploring the establishment of Intelligence Hubs
across all regions in Scotland. These aim to build sustained expertise within regions to
carry out novel and creative economic analysis, providing a deeper and broader
understanding of specific and nuanced regional strengths and challenges.
Consideration is also being given to the provision of resource to support RES delivery.
Actions have therefore been identified to investigate the potential to secure such
resource for Ayrshire. 
2.9 Subject to approval, it is envisaged that delivery will commence in October 2023, with
the launch of the Delivery Plan at Ayrshire Business Week 2023. It is recognised that
some actions, particularly those under the Culture of Delivery theme, are already
underway.
6

Page 7

3. Proposals 
3.1 That the Partnership Board: 
a) Endorses the draft Year One Delivery Plan provided at Appendix One; 
b) Agrees to the submission of the Delivery Plan to the Ayrshire Economic Joint
Committee for approval; and 
c) Agrees to receive further reports for future years of the Delivery Plan 
4. Implications/Socio-economic Duty 
Financial 
4.1 There are no financial implications directly arising from this report, as the identified
actions will be undertaken using existing resources or delivery will be subject to
securing external funding. For example Scottish Government funding to support the
development of a Regional Intelligence Hub. As the action planning and
delivery/governance process continues, an assessment of available and required
resources and financial implications will be undertaken. 
Human Resources 
4.2 None arising from this report. 
Legal 
4.3 Any legal implications arising from the Delivery Plan actions will be considered and
addressed as appropriate through their development. 
Equality/Socio-economic 
4.4 The Regional Economic Strategy aims to tackle disadvantage, reduce inequalities at a
regional level and promote inclusion, through the creation of a wellbeing economy. An
initial equalities impact screening will be undertaken to establish if an Equality Impact
Assessment is required for the identified actions. 
Climate Change and Carbon 
4.5 The Regional Economic Strategy aims to preserve and enhance Ayrshire’s natural
capital, meeting Scotland’s commitments to net zero and protection of biodiversity.  Its
key outcomes include supporting a just transition to Net Zero. The draft Delivery Plan
identifies Year One actions to support these ambitions. 
Key Priorities 
4.6 The Regional Economic Strategy aims to address the key challenges facing the
Ayrshire Economy: delivering a wellbeing economy, enhancing economic activity and
improving physical infrastructure.  Its vision and the six key priority themes on which
the strategy and Deliver Plan are based align with the key priorities of the Regional
Strategy Working Group partners.
7

Page 8

Community Wealth Building 
4.7 The Regional Economic Strategy is the first in Scotland to feature Community Wealth
Building as a founding principle throughout. It is viewed as central to enabling partners
to achieve the strategy’s vision. The draft Delivery Plan identifies Community Wealth
Building as a Cross-Cutting theme and identifies a range of Year One actions to
support these ambitions. 
5. Consultation 
5.1 The draft Delivery Plan was informed by consultation and engagement through the
Regional Economic Strategy Working Group. This has included workshops with a
broad range of stakeholders including local enterprises and Third Sector
organisations. 
Russell McCutcheon
Executive Director (Place) 
For further information please contact Emma McMullen, Senior Manager Economic
Development, on MS Teams or via email: emmamcmullen@north-ayrshire.gov.uk 
Background Papers
Ayrshire Regional Economic Strategy, 2023
8

Page 9

Ayrshire Regional Economic Strategy
Building Wealth for Everyone in Ayrshire- Our Vision for Ayrshire 2033
Year 1 Delivery Plan (2023-2024)
September 2023
Draft version 1.5  
9

Page 10

Ayrshire Regional Economic Strategy: Building Wealth for Everyone in Ayrshire- Our Vision for Ayrshire 2033          Delivery Plan
2
Foreword
Our Ayrshire Regional Economic Strategy (RES) was launched on 19 June 2023, developed in partnership by the Regional Strategy Working
Group of the Ayrshire Economic Partnership Board and approved by the Ayrshire Economic Joint Committee. The RES has ambitions to build
wealth for everyone in Ayrshire by creating opportunities for those who want to live, work, learn and invest in the region. 
The RES signifies the partnership effort in creating a shared vision for our region, indicating where we want to be by 2033. Whilst the RES itself
represents an important step towards working regionally to deliver an improved economy for Ayrshire, the delivery of actions that help us
achieve our desired outcomes is of greater importance. Our Delivery Plan therefore sets out what we need to do to achieve our strategic vision
and recognises the challenges to overcome in the immediate future to allow for the delivery of actions over the medium and longer term.
Our Year 1 Delivery Plan focuses on priorities for this first year of delivery, including a review of regional governance, considerations around
resourcing the delivery of the RES and mapping out baseline evidence to support future delivery and measurement of success. In addition,
three of the priority themes have been identified for particular focus during Year 1: Support for Enterprise, Fair Work and Innovation.
The partnership working of the Regional Strategy Working Group has resulted in the delivery of a robust RES and a shared economic vision for
the first time in Ayrshire. As we move into the delivery stage, the Working Group will change focus and take on the form of a Delivery Group,
with additional members to bring renewed focus and flexibility. This will allow for representation from the third sector, NHS Ayrshire and
Arran, and enhanced representation from the private sector. As a partnership we look forward to working with our communities, enterprises
and wider stakeholders to build wealth for all across Ayrshire. 
The RES Delivery Plan has been developed by the Ayrshire Regional Strategy Working Group on behalf of the Ayrshire Economic Joint
Committee with support from the Economic Recovery Group.
10

Page 11

3 
CONTENTS
Foreword 
1. Our Regional Economic Strategy               4
2. Our Economic Focus: Inclusive, Ambitious, Achieving            6
3. Delivering Our Strategy                8
4. Priority Theme 1: Support for Enterprise              10
5. Priority Theme 2: Fair Work               13
6. Priority Theme 3: Innovation               16
7. Priority Theme 4: Good Health and Wellbeing             20
8. Priority Theme 5: Stronger Places and Communities            23
9. Priority Theme 6: Enhancing Natural Capital             26
10. Culture of Delivery                29
11. Cross-Cutting Themes                32
12. Delivery Framework and Action Plan: Year 1             37
13. Review and Refresh                38 
Appendix 1: Delivery Framework               39
Appendix 2: Indicative Year 1 Programme             42  
11

Page 12

4 
1.0 OUR REGIONAL ECONOMIC STRATEGY
The Ayrshire region offers a wealth of opportunities, with strengths in sectors of national significance and a stunning natural landscape. Our
regional vision has been shaped by the key partners driving forward the strategy, in engagement with wider stakeholders. It captures these
strengths and our ambitions to make Ayrshire a unique destination in which to live, work, invest and visit. Our Regional Economic Strategy (RES)
addresses the key challenges facing our economy. It is externally positioned within a national policy context at Scottish and UK levels, including
the National Strategy for Economic Transformation (NSET) and the Levelling Up White Paper. It reflects the desire of Ayrshire to take a different
approach to regional economic development; an inclusive approach based on the principles of Community Wealth Building (CWB), to achieve a
wellbeing economy by 2033. 
Our RES faces our key challenges head on:
• Delivering a wellbeing economy: addressing high incidences of deprivation and child poverty by connecting communities to opportunities,
whilst achieving a just transition to net zero. 
• Enhancing economic activity and productivity: addressing low economic activity rates, high unemployment rates and skills mismatch/
shortages to make the most of inward investment opportunities. 
• Improving physical infrastructure: addressing poor road linkages, reduced and unreliable public transport, high levels of vacant and derelict
land and island and rural specific challenges, whilst capitalising on significant blue economy/marine environment opportunities. 
By building on the significant strengths we have as a region to help us address these challenges:
• A strong foundational economy
• An entrepreneurial culture
• Sectors of national significance including aerospace, tourism and food and drink
• A rich array of natural capital
• A strong sense of identity amongst businesses and residents
• Existing strong regional governance including a pioneering Community Wealth Building approach to economic development. 
12

Page 13

5 
With a ten-year timeframe, to 2033, the RES promotes a step change away from traditional economic development approaches to one that
adopts the principles of CWB and delivers a region where wealth is shared fairly, where residents can live full and healthy lives, where our
region is attractive to investors and visitors and where we prioritise and protect our natural wealth and culture.  
13

Page 14

6 
2.0 OUR ECONOMIC FOCUS: INCLUSIVE, AMBITIOUS, ACHIEVING
The Ayrshire RES shared vision is:
Ayrshire will be a region where wealth is shared fairly, to enable people of all ages to live full and healthy lives. Our region will be
outward looking, attractive to investors and visitors, making a major contribution to Scotland’s economic development. We will also
prioritise the protection of our natural wealth and culture. This is how our residents, communities, institutions and enterprises will
rise to the opportunities and adapt to the challenges of the future.
OUR PRINCIPLES
Our principles focus on delivering economic renewal by embracing an inclusive CWB approach to economic wellbeing:
• Building wealth for the benefit of local communities
• Inclusive yet targeted
• Collaborative yet respectful
• Evidence based yet imaginative
• Ambitious yet responsive
• Place based yet speaking powerfully with one voice.
PRIORITY THEMES
In order to achieve our vision, we have developed a series of six key priority themes. These themes have been developed through extensive
engagement and through the delivery of activity aligned to each theme, the vision for Ayrshire 2033 will be achieved. Themes 1 to 3 have been
identified as immediate priorities for this Year 1 Delivery Plan, with the focus for actions under Themes 4 to 6 being developed during this initial
year for delivery in future years. This is reflective of the opportunities to achieve immediate progress under some actions in Themes 1 to 3, due
to initial work already underway; in addition to an acknowledgement that groundwork must be set for Themes 4 to 6 during Year 1 to inform
the development and enable progress of actions in future years. Actions are also identified under the Culture of Delivery theme and three Cross
Cutting Themes.
14

Page 15

7 
-Skills
15

Page 16

8 
3.0 DELIVERING OUR STRATEGY
Our RES is ambitious. We have a vision for Ayrshire by 2033 and outcomes that we want to achieve. In order for us to chart progress over the
next ten years and know that what we are doing is working, we have set a series of ambitious long-term strategic priorities that are aligned to
our priority themes and outcomes.  These have been developed with reference to our Ayrshire Inclusive Growth Diagnostic and the Scottish
Government’s Wellbeing Economy Toolkit. Our actions already developed and under development will sit under each of these long-term
priorities to allow us to work towards achieving these.
We are committed to developing a wellbeing economy in Ayrshire which generates: 
16

Page 17

9 
YEAR 1: 2023-24
This Year 1 Delivery Plan focuses on actions that can feasibly be commenced and/or delivered in the year 2023-24. A considerable amount of
activity is already underway that aligns to the priorities of the RES, including by the six Regional Recovery and Renewal Workstreams, through
projects delivered by the Ayrshire Growth Deal, through the pioneering work of the Ayrshire Community Wealth Building Commission, Anchor
Charter and Anchor Network, and by the Ayrshire Economic Partnership Board, by unlocking funding made available by the Scottish and UK
Governments.  This Delivery Plan seeks to build on existing work, add value, and align to the RES priority themes, in addition to enhancing with
new activity targeted towards achieving our long-term ambitious priorities. 
Acknowledging the scale of the task ahead, the Regional Strategy Working Group has prioritised three key themes of Support for Enterprise, Fair
Work and Innovation, under which some initial actions will kick start year 1 delivery.  Development and delivery of actions under these three
themes will be complemented and supported by actions under the Culture of Delivery theme, which will directly support delivery of the RES, in
addition to Cross-Cutting Actions under the themes of Digital and Community Wealth Building. In addition, Year 1 will seek to develop medium-
and longer-term actions under all six priority themes.
A common action running across all six priority themes in year 1 is a mapping exercise to determine existing activity and ensure a coordinated
approach to the delivery of the RES. Ultimately, the RES will sit as an umbrella strategy for the region, with other strategic economic activity
such as the Ayrshire Growth Deal and Community Wealth Building Commission and Anchor Charter reporting to the RES governance structures. 
A mapping process for each theme including a SWOT analysis, horizon scanning and review of existing actions will assist with a streamlined and
consistent approach to delivery. This will link into the governance review to be conducted under the Culture of Delivery theme which will seek
to identify lead organisations to ensure actions are progressed. In addition, the Regional Strategy Working Group (RSWG) will be developed into
the Regional Strategy Delivery Group (RSDG) with additional representation on the group sought from the third sector, NHS Ayrshire & Arran
and the private sector.  This will strengthen the existing group for the delivery phase and will maximise stakeholder input. 
The following sections of the Delivery Plan set out the actions, identify the key partners to be involved and the proposed initial timescales. Year
1 delivery will commence in October 2023, with the launch of the RES Delivery Plan at Ayrshire Business Week 2023. It is recognised that some
actions, particularly those under the Culture of Delivery theme, are already underway. 
17

Page 18

10 
4.0 THEME 1: SUPPORT FOR ENTERPRISE
“A region where businesses can grow, entrepreneurship and creativity can flourish.”
Theme Outcomes:
SE01 Improved digital infrastructure for our region, encouraging new residents, new business start-ups and new investment. 
SE02 Enhanced business support services that focus on domestic and global growth, innovation and procurement support to help retain wealth
locally. 
SE03 Improved quantity and quality of business space provision to meet evidenced demand, particularly for SMEs. 
SE04 Improved support for the third sector to deliver community wealth, through support, training and capacity building.  
Ayrshire has a number of strong industries including manufacturing and engineering and the visitor economy, all of which have a unique set of
attributes. Businesses across Ayrshire make a valuable contribution to the wider Scottish and UK economy, but there is an opportunity to grow
and develop business development further. This requires adequate support that is easily accessible and guaranteed to help create businesses
that align with the future of the Ayrshire economy. This can be achieved by embedding the objectives of the RES into current work of partners
delivering business support.
Aligned with a more proactive approach to assisting newly formed businesses, Ayrshire can become an area known for its strong support and
clear strategy on business development. The work of Scottish Development International in positioning Ayrshire as a regionally and nationally
significant inward investment destination can be built upon, in collaboration with Scottish Enterprise. Alongside this, more business support
specifically tailored for social enterprises and community groups is required, so they are equipped to take a more active role in the economy,
with particular reference to bidding for public contracts.
A series of Year 1 short-term actions has been developed under the Support for Enterprise theme. In addition, there is a commitment to
developing the medium- and long-term actions over the coming years. Actions are presented linked to outcomes and with key partners
identified. 
18

Page 19

11 
Action 1.1 Action 1.2 Action 1.3 Action 1.4
Develop a support matrix to address key
issues raised by businesses which
integrates with other agencies, linked to
the new RES website.
Undertake a mapping exercise to
determine existing activity and ensure a
co-ordinated approach to RES delivery. 
This should cross-reference with actions
under Culture of Delivery.
Support the mid-term review and
evaluation of the AGD CWB business
support programme with consideration
of future options. 
Identify priorities and opportunities to
develop actions to support communities
and landowners to bring vacant and
derelict assets into positive use, taking
on board initial work from the CWB
Lead Officer Working Group. 
Sub Actions
1. Review the best and most effective
delivery approach for this theme in
line with overall governance review.
2. Engage across the three Authorities,
Chamber, SE and TSIs to develop
support matrix.
3. Provision of information for RES
website.
4. Test resulting support with RSDG. 
Sub Actions
1. SWOT analysis.
2. Horizon scanning.
3. Review of existing actions in theme
area being delivered outwith the
RES.
4. Assessment of RES Support for
Enterprise actions to add value and
avoid duplication. 
Sub Actions
1. RSDG to engage with NAC as AGD
CWB project lead to support the
mid-term review and programme
evaluation. 
Sub Actions
1. Undertake audit of vacant and
derelict land and assets across
authority areas using existing data.
2. Complete the land and assets GIS
mapping exercise.
3. Undertake constraints exercise of
assets to understand any other
factors constraining development.
4. Identify opportunities to enhance or
expand the support currently
available, including funding
opportunities. 
Links to Outcomes
SE02
Links to Outcomes
No specific outcome link
Links to Outcomes
SE02
Links to Outcomes
SE03
Key Partners
Chamber of Commerce, local
authorities, Scottish Enterprise, Third
Sector Interfaces, local enterprises
Key Partners
RSDG members, local enterprises 
Key Partners
RSDG, Local authorities, PMO
Key Partners
Local Authorities, Scottish Enterprise
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Timescale
Medium-term
Links to Priorities
SP02, SP03, SP04, SP07
Links to Priorities
No specific priority link
Links to Priorities
SP02, SP03, SP07
Links to Priorities
SP06 
19

Page 20

12 
Action 1.5 Action 1.6
Provide improved support for social enterprise activity with strong partnership
between Councils, Chamber of Commerce and TSIs. 
Identify funding opportunities and secure funding to improve capacity and build
resilience of third sector enterprises.
Sub Actions
1. Link with Culture of Delivery action 7.5 for engagement with TSIs in launch of
RES Delivery Plan and third sector enterprise membership on business panel.
2. RSDG to assess support available to third sector enterprises for incorporation
into support matrix (Action 1.1).
Sub Actions
1. RSDG to prepare a brief for a feasibility study into funding opportunities for
improving capacity and building resilience of third sector enterprises in the
region.
2. Commission recognised consultants/think tanks with CWB and third sector
expertise, through competitive tender, to undertake research.
3. Use findings of research to develop future sub actions under this medium-term
action, supporting action 1.5.  
Links to Outcomes
SE04
Links to Outcomes
SE04
Key Partners
Chamber of Commerce, local authorities, Third Sector Interfaces, local enterprises
Key Partners
Local authorities, TSIs
Timescale
Short-term
Timescale
Medium-term
Links to Priorities
SP2, SP3, SP4, SP7
Links to Priorities
SP2, SP3, SP4, SP5  
20

Page 21

13 
5.0 THEME 2: FAIR WORK
“A region which offers all individuals an effective voice, opportunity, security, fulfilment, and respect in work.”
Theme Outcomes:
FW01 Improved access to jobs and fair employment opportunities by addressing barriers faced by different groups. 
FW02 Improved access to training and lifelong learning, enabling the workforce to adapt to changing requirements. 
FW03 Employers in the region have adopted Fair Work principles, for example paying the living wage, offering secure employment                                                      
contracts and jobs that are fulfilling and offer progression. 
FW04 Public sector Anchor Institutions spend and employ progressively, setting a benchmark for other Ayrshire businesses to follow.
Across Ayrshire there is an existing and predicted future labour market shortage and skills gap. This causes concern for future growth and
resilience of the local economy. There are several successful initiatives that are working to tackle these issues and to create a skilled workforce
accessing employment opportunities that are paid the real living wage and offer secure futures and routes for progression. We need to build on
the work already being done with Anchors through the Community Wealth Building Commission Fair Work Workstream. In addition, the
Ayrshire Skills Plan, Ayrshire Skills Investment Fund and Fair Work Ayrshire project are all new initiatives that will ensure the region is prepared
for the economy, jobs, and skills of the future. These take into consideration broader trends and requirements such as the long-term decline in
manufacturing, increasing demand from the health and social care sector, and opportunities emerging from efforts to transition to a Net Zero
economy.
A mapping exercise, covering skills shortages and labour market gaps now and in the future with emerging opportunities in the green and digital
economies, is an important piece of work that can be achieved through forthcoming priorities for the skills workstream. Closer partnership
working is required between schools, Business Support and employability, Ayrshire College, organisations such as Skills Development Scotland,
Scottish Enterprise, the University of the West of Scotland, and local businesses to deliver priority actions under the Fair Work theme.
A series of Year 1 short-term actions has been developed under the Fair Work theme. In addition, there is a commitment to developing the
medium- and long-term actions over the coming years. Actions are presented linked to outcomes and with key partners identified. 
21

Page 22

14 
Action 2.1 Action 2.2 Action 2.3
Undertake a mapping exercise to determine
existing activity and ensure a co-ordinated
approach to RES delivery. 
This should cross-reference with actions under
Culture of Delivery.
Support Local Employability Partnerships (LEPs) in
the development and implementation of pathways
into employment for those clients who are
currently furthest from the labour market, in
partnership with the CWB Commission Fair
Employment workstream.
Work with learning providers to maximise uptake of
National Entitlement Card (NEC) scheme for young
people under 22 years to reduce travel related
barriers to employment. 
Sub Actions
1. SWOT analysis.
2. Horizon scanning.
3. Review of existing actions in theme area being
delivered outwith the RES.
4. Assessment of RES Fair Work actions to add
value and avoid duplication. 
Sub Actions
1. Review the best and most effective delivery
approach for this theme in line with overall
governance review. 
2. RSDG to build on CWB Commission work to
map out sectoral and regional skills gaps and
identify current pre-work training activity
aligned to these skills gaps for client groups
experiencing barriers to employment.
3. RSDG to develop a cross-cutting pan-Ayrshire
model based on findings.
4. Commence delivery of pre-work training
programme. 
Sub Actions
1. Devise a proposal to work with schools and
employability partners to maximise the uptake
of NEC for young people aged under 22 years.
2. Consider transitional support for DWP clients
who may be eligible after securing
employment.
3. Investigate opportunities for support for other
age groups, directly engaging with
SPT/Stagecoach to discuss options for support. 
4. Implementation of options.
Links to Outcomes
No specific outcome link
Links to Outcomes
FW01, HW03
Links to Outcomes
FW01
Key Partners
LEPs, local enterprises, TSI members
Key Partners
LEPs, Ayrshire College, UWS, SDS, local enterprises
Key Partners
LEPs, Ayrshire College, SDS, local enterprises,
transport providers
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Links to Priorities
No specific priority link
Links to Priorities
SP01, SP02, SP03, SP04
Links to Priorities
SP01, SP02, SP03 
22

Page 23

15 
Action 2.4 Action 2.5 Action 2.6
Support consideration of the future of the Fair
Work Ayrshire (FWA) element of the AGD CWB
programme. 
Linked to Action 1.3.  
Support the adoption of the Real National Living
Wage across public bodies and the private sector,
linking to the progress made by Fair Work Ayrshire
in promoting adoption of the RNLW across
Ayrshire.
Identify and appoint Fair Work Champions in
Anchor Organisations and enterprises across
Ayrshire.
Sub Actions
1. RSDG to support the AGD CWB programme
mid-term review and evaluation to ensure RES
outcomes are considered.
2. RSDG to consider outcomes and opportunities
for extension of FWA.
Sub Actions
1. Following on from Action 2.4, RSDG to take
forward progress made by FWA programme
and develop actions around this for Year 2
onwards. 
Sub Actions
1. RSDG to develop a role profile for FW
Champion.
2. RSDG to work with FWA to identify Champions
in Anchor Organisations and enterprises.
3. RSDG to appoint Champions.
4. Champions promote Fair Work within their
organisations.
Links to Outcomes
FW03
Links to Outcomes
FW03
Links to Outcomes
FW04
Key Partners
Local authorities, PMO, local enterprises
Key Partners
LEPs, local enterprises
Key Partners
LEPs, local enterprises
Timescale
Short-term
Timescale
Medium-term
Timescale
Medium-term
Links to Priorities
SP02
Links to Priorities
SP02
Links to Priorities
SP02 
23

Page 24

16 
6.0 THEME 3: INNOVATION
“A region where enterprises and the public sector adopt innovative solutions to address economic problems.”
Theme Outcomes:
IN01 Adoption and utilisation of innovation assets created through successful delivery of Ayrshire Growth Deal projects.  
IN02 Development of effective partnerships across public, private and academic sectors with a view to fully enabling the transfer of knowledge
and technology, stimulating economic opportunity and leveraging additional investment around innovation activity.
IN03 Increased levels of R&D (encompassing Business, Higher Education, Government and Private Non-Profit) within Ayrshire, maximising specific
sectoral opportunities and the development of Innovative Places. 
IN04 Continued use of CWB as a mechanism to embrace new economic development practice and addressing where innovative public sector
activity can support wider wellbeing outcomes. 
It has long been recognised that there are significant economic benefits to stimulating innovation activity within Ayrshire. Bodies such as SE,
SDS, SFC, Innovate UK and UKTI all evidence the significant difference innovation can make in stimulating economic opportunity e.g. innovative
firms grow twice as fast as those which do not. Innovation is seen as the engine of long-term economic development and has underpinned
much of the UK’s historic productivity growth. Yet as a region, business expenditure on R&D (BERD) across all local authorities in Ayrshire is well
below the Scottish average. At present, BERD for Ayrshire is £73 per head of population, compared to £263 nationally. 
One of the priorities for the Ayrshire Growth Deal is the introduction of innovation through the transfer of good practice, the development and
use of benchmarks and the adoption of new processes. Yet to fully embrace the benefits of the economic assets created through the AGD, there
is a need for collaboration across partners both regionally and nationally, building strong relationships between the public and private sector,
while embracing the role academia can play in furthering knowledge transfer and technology development. There is also a need to develop
innovative capacity and capability within businesses, enabling them to embrace the opportunities that come through the introduction of new
processes or equipment. The introduction of CWB within Ayrshire demonstrates the public sector seeking to introduce new systems to address
long standing inequalities across communities, while offering tangible solutions to business e.g. through procurement practices. 
24

Page 25

17 
A series of Year 1 short-term actions has been developed under the Innovation theme. In addition, there is a commitment to developing the
medium- and long-term actions over the coming years. Actions are presented linked to outcomes and with key partners identified. 
25

Page 26

18 
Action 3.1 Action 3.2 Action 3.3 Action 3.4
Undertake a mapping exercise to
determine existing activity and
ensure a co-ordinated approach to
RES delivery. 
This should cross-reference with
actions under Culture of Delivery.
Map the innovation landscape in
Ayrshire aligned to key
opportunities, identifying
partnership approach in areas such
as policy (making and
implementation), knowledge
(creation and exploitation), skills
and physical infrastructure.
Assess requirements for innovation
centres, using information gathered
under Action 3.1.   
Undertake a review of our key
sectors (and where cluster
development may be possible in
areas such as Aerospace/Space or
Life Sciences) to recognise which are
more likely to drive R&D and
address where spend can be
targeted. Linked to action 3.1.  
Sub Actions
1. SWOT analysis.
2. Horizon scanning.
3. Review of existing actions in
theme area being delivered
outwith the RES.
4. Assessment of RES Innovation
actions to add value and avoid
duplication.
Sub Actions
1. Scottish Enterprise to agree
commitment of time to deliver
this mapping exercise.
2. RSDG to work with SE
Innovation Systems team to
maximise benefits across the
partnership and beyond to
utilise new and existing
innovation assets e.g. Prestwick.
Sub Actions
1. Inform the national innovation
centres of local requirements
following mapping exercise.
2. Develop local capacity. 
Sub Actions
1. Review work started with HALO,
DPMC and Ayrshire College.
2. Undertake further research and
review- responsibility of SE.
3. Use research findings to support
development of action(s) for
Year 2 onwards around
targeting spend for R&D.
Links to Outcomes
No specific outcome link
Links to Outcomes
IN01
Links to Outcomes
IN01
Links to Outcomes
IN03
Key Partners
RSDG members, local enterprises
Key Partners
SE
Key Partners
SE, local authorities, Ayrshire
College, UWS
Key Partners
SE, local authorities, PMO, Ayrshire
College, NMIS
Timescale
Short-term
Timescale
Short-term
Timescale
Medium-term 
Timescale
Short-term
Links to Priorities
No specific priority link
Links to Priorities
SP02, SP04
Links to Priorities
No specific priority link 
Links to Priorities
SP02, SP04 
26

Page 27

19 
Action 3.5 Action 3.6
Based on identified needs, adopt the established approach of projects like
the EV pathfinder/ Core/ 9cc/ Hagshaw, encouraging private sector
investment in low carbon/ renewable projects and engagement with HE
and FE partners, supporting transition to net zero and removing fuel
poverty. 
Use Ayrshire as a test bed for developing consortium models to enable
private and third sector organisations to work together collectively to bid
for and deliver public service contracts. 
Sub Actions
1. Communications subgroup to work with the Business Panel and
partners to bring together case study examples to showcase success.
2. Publish case study examples on RES website.
3. Develop action(s) for Year 2 onwards reflecting on success to stimulate
new projects of this nature. 
Sub Actions
1. Commission feasibility/research to uncover worldwide best practice on
the development of consortium models.
2. Build action(s) on the back of this research.
Links to Outcomes
IN03
Links to Outcomes
IN04
Key Partners
Communications subgroup, SE, UWS, Ayrshire College, Innovate UK
Key Partners
Local authorities, SE (CDS)
Timescale
Medium-term
Timescale
Medium-term
Links to Priorities
SP02, SP03, SP04
Links to Priorities
SP04 
27

Page 28

20 
7.0 THEME 4: GOOD HEALTH AND WELLBEING
“A region where people of all ages have the access to resources to live a healthy, full and purposeful life.”
Theme Outcomes:
HW01 Strengthened partnership working between agencies including NHS Ayrshire and Arran, to ensure a holistic and person-centred approach
to support people to fully contribute to the local economy. 
HW02 Improved access to childcare, transport and local jobs, to improve quality of life and allow for individuals’ increased participation in the
local economy. 
HW03 More inclusive approach to recruitment by key employers in our region, to support those experiencing health related barriers to
employment to enter or re-enter the labour market. 
A stronger and more inclusive economy will bring significant health benefits to Ayrshire residents. Inactivity rates in our region are high and of
concern. This relates to people not in employment but not seeking work due to ill health. The mismatch between available employment and
available workforce must be addressed, and this links to Priority Theme 2: Fair Work. The Ayrshire Growth Deal project, Working for a Healthy
Economy, is already making progress in this area and this regional approach to economic inactivity should continue. In addition, NHS Ayrshire and
Arran must become key partners in our RES and work with partners to maximise the economic, social and environmental outputs.  NHS Ayrshire
and Arran is already operating as a CWB Anchor Institution and has appointed an NHS Community Wealth Building Officer. Future enhanced joint
working could involve close collaboration with our Ayrshire authorities to ensure economic decision making is interlinked with health problems
to address the deep-rooted issues that exist in many Ayrshire communities. In addition, the RES should take cognisance of Caring for Ayrshire
which will act as a catalyst for alternative service delivery in healthcare and will offer significant opportunities for the region. 
Actions under the Good Health & Wellbeing theme are focused on the medium and long term, with a commitment to developing detail around
these during year 1. 
28

Page 29

21 
Action 4.1 Action 4.2 Action 4.3 Action 4.4
Undertake a mapping exercise to
determine existing activity and
ensure a co-ordinated approach to
RES delivery. 
This should cross-reference with
actions under Culture of Delivery.
Engage NHS Ayrshire & Arran, Public
Health Scotland and Health and
Social Care Partnerships in Regional
Strategy Working Group to develop
health related actions.
Investigate opportunities to support
transport operators to transition to
low emission fleets. 
Commission research during Year 1
to investigate opportunities for
supporting communities to improve
and deliver community transport.
Sub Actions
1. SWOT analysis.
2. Horizon scanning.
3. Review of existing actions in
theme area being delivered
outwith the RES.
4. Assessment of RES Good Health
& Wellbeing actions to add
value and avoid duplication. 
Sub Actions
1. Engage with colleagues from
NHS, PHS and the HSCPs to
agree a health representative to
join the Regional Strategy
Working Group.
2. Participation of representative
in action planning sessions and
discussions throughout Year 1.
3. Develop action/actions for Year
2 onwards. 
Sub Actions
1. Engage with Strathclyde
Partnership for Transport.
2. Engage with transport operators
to establish current position on
fleet and low emission transition
plans.
3. Develop action(s) for future
year(s) implementation. 
Sub Actions
1. Identify and secure funding for
research.
2. Write brief, taking account of
pilot projects underway.
3. Commission research to identify
what are the community needs,
aspirations to deliver
community transport,
consideration of examples from
elsewhere and identification of
funding opportunities. 
4. Develop follow on actions for
Year 2 onwards.
Links to Outcomes
No specific outcome link
Links to Outcomes
HW01
Links to Outcomes
HW02
Links to Outcomes
HW02
Key Partners
RSDG, NHS AA, local authorities,
local enterprises
Key Partners
NHS Ayrshire & Arran, Public Health
Scotland, HSCPs
Key Partners
SPT
Key Partners
Local authorities, local communities
Timescale
Short-term
Timescale
Short-term
Timescale
Medium-term
Timescale
Short-term
Links to Priorities
No specific priority link
Links to Priorities
SP08
Links to Priorities
SP08
Links to Priorities
SP03 
29

Page 30

22 
Action 4.5 Action 4.6
Consider unique support required to island
communities regarding improving access to
childcare, transport and local jobs.
Develop and strengthen our wider understanding
of inward and outward migration in Ayrshire and
the quality of housing to support the population
and reduce fuel poverty.
Sub Actions
1. Liaise with Senior Officer - Islands at NAC to
understand from the Island Plans what the
needs are in terms of access to childcare,
transport and local jobs.
2. Use this evidence to map out need and
engage with the island communities through
the Island Plan Steering Groups to capture
the unique support required.
3. Create a follow-on island specific action.
Sub Actions
1. Task the Regional Intelligence Hub with
providing the data required and
interpretation of data to aid understanding.
2. Develop medium-term actions for Year 2
onwards. 
Links to Outcomes
HW02
Links to Outcomes
No specific outcome link
Key Partners
NAC, island communities
Key Partners
Regional Intelligence Hub
Timescale
Short-term
Timescale
Medium-term
Links to Priorities
SP03
Links to Priorities
SP08 
30

Page 31

23 
8.0 THEME 5: STRONGER PLACES AND COMMUNITIES
“A region where local economies can sustain thriving communities and deliver good public and private services to residents and visitors.”
Theme Outcomes:
PC01 Improved infrastructure within our towns and villages, with consideration of 20-minute neighbourhoods. 
PC02 Improved cultural and social infrastructure which boosts existing cultural and heritage assets, helps to improve regional identity and pride
in place and contributes to growth in the visitor economy. 
PC03 Empowerment for our residents and communities to have a stake in improving their place. 
PC04 Improved public transport for rural communities. 
The pandemic saw an enormous response from our communities in the form of volunteering and mutual aid. People responded to the crisis, and
in doing so developed new relationships and connections, whilst making use of local assets. There is a desire amongst communities and community
groups to build on this and become involved in CWB and the wellbeing economy. Some examples of how this may happen include community-led
regeneration, participatory budgeting and community asset transfer. However, at present many are unaware of how exactly they can do this. This
requires collaboration between community groups, Community Planning Partnerships and our local authorities to initially understand the capacity
building needs of these groups. This process can be supported by the three Third Sector Interfaces operating across our region. Any future work
in this area should be informed by the outcome of the ongoing review of the Community Empowerment Act, which will have a particular focus on
community ownership and strengthening decision-making to improve outcomes for the local community. In addition, there are a number of
challenges faced by our communities in relation to public transport and rural inequalities affordability, withdrawal of services, limited provision
in rural areas and issues with connections to centres of employment. There is a requirement for the RES to address this.   
Actions under the Stronger Places & Communities theme are focused on the medium and long term, with a commitment to developing detail
around these during year 1. 
31

Page 32

24 
Action 5.1 Action 5.2 Action 5.3 Action 5.4
Undertake a mapping exercise to
determine existing activity and
ensure a co-ordinated approach to
RES delivery. 
This should cross-reference with
actions under Culture of Delivery.
Review of environments for town
centre living given decline in retail
activity- town centre living pilot
project. Implement Regional Spatial
Strategy and NPF4 and LDP for town
centre living and 20-minute
neighbourhoods.
Stimulate business start-ups linked to
20 Minute Neighbourhood needs and
requirements.
Develop a regional cultural and
heritage strategy.
Sub Actions
1. SWOT analysis.
2. Horizon scanning
3. Review of existing actions in
theme area being delivered
outwith the RES.
4. Assessment of RES Stronger
Places & Communities actions to
add value and avoid duplication.
Sub Actions
1. Develop proposals to design
specific town centre health check
related to town centre living with
one pilot selected per council. 
2. Include CWB elements e.g.
diverse owned shops, alternative
use of land and assets, proposals
for VDL and do key business
owners pay the RLW.
3. Appraisal of pilot and roll out.
4. Development of Year 2 onwards
actions to link with
implementation of RSS and link
to NPF4 and local LDPs. 
Sub Actions
1. Undertake an audit of needs of
businesses to respond to Scottish
Government’s 20 Minute
Neighbourhoods proposals.
2. Use results of audit to develop
medium term actions for Year 2
onwards.
Sub Actions
1. Each local authority to undertake
an audit of cultural and heritage
assets in their council area.
2. Using this baseline, commission a
regional cultural heritage strategy
in Year 2.
3. Develop medium to long term
actions as a result of the strategy.
Links to Outcomes
No specific outcome link
Links to Outcomes
PC01
Links to Outcomes
PC01
Links to Outcomes
PC02
Key Partners
RSDG members, NHS AA, local
enterprises
Key Partners
Local authorities
Key Partners
Local authorities
Key Partners
Local authorities
Timescale
Short-term
Timescale
Medium-term
Timescale
Short-term
Timescale
Medium-term
Links to Priorities
No specific priority link
Links to Priorities
SP03, SP06
Links to Priorities
SP04
Links to Priorities
SP07 
32

Page 33

25 
Action 5.5 Action 5.6 Action 5.7
Engage with the delivery of the Arran and
Cumbrae Ten Year Island Plans to ensure
alignment with RES ambitions.
Adopt a joined-up regional approach to external
funds where appropriate to support place-based
investment, for example through UK Shared
Prosperity Fund and Levelling Up Fund. 
Consider how to best utilise developer contributions
to deliver improved infrastructure. 
Sub Actions
1. RSDG to engage with the governance
structures for the Arran and Cumbrae plans
to ensure that actions are aligned to the
RES and the strategies are mutually
beneficial. Link to action 4.5.  
Sub Actions
1. Participate in SLAED External Funding Group.
2. Consider the need to establish a regional
external funding group to consider future
regional funding opportunities for place-based
investment, such as UKSPF, Levelling Up Fund
and Scottish Government regional funding. 
3. Develop future actions around coordinated
regional submissions to these funds. 
Sub Actions
1. In Year 2, undertake research into the
opportunity for a regional approach to
developer contributions in relevant
circumstances. 
2. Development of longer-term actions in response
to research findings. 
Links to Outcomes
PC03
Links to Outcomes
PC04
Links to Outcomes
PC04
Key Partners
North Ayrshire Council, island delivery plan
groups
Key Partners
Local authorities, Scottish and UK Governments
Key Partners
Local authorities
Timescale
Short-term
Timescale
Short-term
Timescale
Medium-term
Links to Priorities
SP01, SP07, SP08
Links to Priorities
SP06
Links to Priorities
No specific priority link 
33

Page 34

26 
9.0 THEME 6: ENHANCING NATURAL CAPITAL
“A region where Ayrshire’s natural capital is preserved and enhanced, meeting Scotland’s commitments to Net Zero and protection of
biodiversity.”
Theme Outcomes:
NC01 Better understanding of the natural capital that exists across our region, with proposals to enhance this for visitor use whilst preserving for
future generations. 
NC02 Development of a regional energy masterplan with a focus on meeting Net Zero targets.
NC03 Supporting a just transition to Net Zero. 
Ayrshire has a rich natural landscape, and in order to preserve and continue to improve it, a clear understanding of what natural capital exists at
a regional level is needed. This will allow for specific interventions where they are needed most. A visitor management strategy would identify
where infrastructure and facility investment are required over long term. As our region moves towards Net Zero targets, its natural assets will
continue to underpin CWB. Alongside this clearer understanding of the natural capital there also needs to be the development of an energy
masterplan. Without this, a clear plan on how Ayrshire will reach its Net Zero targets will not be possible. Community benefits deriving from green
energy projects should be prioritised. Collaboration is needed between the local authorities, academics from the University of the West of Scotland
and Scottish Government land bodies to develop the plan and then build on the recommendations. 
Actions under the Enhancing Natural Capital theme are focused on the medium and long term, with a commitment to developing detail around
these during year 1. 
34

Page 35

27 
Action 6.1 Action 6.2 Action 6.3 Action 6.4
Undertake a mapping exercise to
determine existing activity and
ensure a co-ordinated approach to
RES delivery. 
This should cross-reference with
actions under Culture of Delivery.
Support the delivery of the pan-
Ayrshire Energy Masterplan.
Identify opportunities for regional
delivery under the three Ayrshire
Authorities’ Sustainability Strategies.
Investigate the potential for regional
delivery of natural capital projects
under UK Gov and SG funding
sources including the Rural Tourism
and Infrastructure Fund.
The following sub actions will
support this action:
1. SWOT analysis.
2. Horizon scanning.
3. Review of existing actions in
theme area being delivered
outwith the RES.
4. Assessment of RES Enhancing
Natural Capital actions to add
value and avoid duplication.
The following sub actions will
support this action:
1. Coordinate on approach to
LHEES and consider jointly, cross
boundary sites and issues.
2. Consider scope for regional
schemes to incentivise uptake of
net zero technologies, linked to
net zero accelerator scheme. 
The following sub actions will
support this action:
1. Review strategy priorities and
actions to identify regional
linkages and opportunities.
The following sub actions will
support this action:
1. Review strategy priorities and
actions to identify regional
linkages and opportunities. 
Links to Outcomes
No specific outcome link
Links to Outcomes
NC02 
Links to Outcomes
NC03
Links to Outcomes
NC01, NC03
Key Partners
RSDG members, local enterprises
Key Partners
Local authorities
UK and Scot Gov, SE
Key Partners
Local authorities
Key Partners
Local authorities, SG 
Timescale
Short-term
Timescale
Medium-term
Timescale
Short-term
Timescale
Short to Medium term
Links to Priorities
No specific priority link
Links to Priorities
No specific priority link
Links to Priorities
SP01, SP02, SP03
Links to Priorities
SP07 
35

Page 36

28 
Action 6.5 Action 6.6
Support the delivery of the EV Pathfinder project. Investigate the potential to develop a regional Mobility as a Service (MaaS)
project. 
The following sub actions will support this action:
Support the three Authorities, informed by outcome of Business Case
proposal from Transport Scotland to:
1. Undertaken final public consultation on locations.
2. Issue tender documentation.
3. Implement the project. 
The following sub actions will support this action:
1. Consider recommendations of Islands Connectivity Study report MaaS
recommendations.
2. Identify opportunities for delivery with Strathclyde Partnership for
Transport (SPT). 
Links to Outcomes
NC03
Links to Outcomes
NC01, NC03
Key Partners
Local authorities
Key Partners
Local authorities and Strathclyde Partnership for Transport
Timescale
Short to Medium term
Timescale
Short-term
Links to Priorities
SP07
Links to Priorities
SP03  
36

Page 37

29 
10.0  CULTURE OF DELIVERY
The Culture of Delivery theme is essential to the successful delivery of the RES. We already have strong regional partnerships in Ayrshire,
evidenced through the CWB Commission and work of Anchor Institutions, the Ayrshire Growth Deal, the regional recovery and renewal
workstreams, and the Regional Economic Partnership Board. These are highlighted as our enablers in our strategy framework (pp. 54-55 of the
RES). However, an emerging theme from the consultation with stakeholders in producing the RES highlighted the opportunity for a regional
governance review to enable streamlined and joined up delivery. The shared challenges and ambition we have requires partners to pioneer new
and innovative forms of joint working and associated governance.
Successful delivery of this strategy will demand a culture of delivery and accountability in which objectives are shared and responsibilities are
clearly allocated and accepted across the public, private and third sector. Part of the regional governance review must consider the work of the
current Recovery and Renewal Workstreams and the operational and future projects of the Ayrshire Growth Deal, on order to map across
activity to ensure synergy, most appropriate and efficient use of resources and most importantly avoid duplication of effort.
Some of the Culture of Delivery actions are already underway with more due online in advance of the launch of the RES Delivery Plan. All are
short-term actions, designed to create effective progression routes for the RES. As such, there is no linkage to the outcomes and priorities
highlighted.
For all the themed actions, it will be important to conduct mapping exercises to take forward the actions from the outset. However, this needs
to avoid duplication and needs to incorporate/work with the following: Recovery & Renewal Workstreams, Commission Workstreams, PMO/
AGD projects, LEPs. The governance review should, as a matter of urgency, map out existing activity and set out proposals for streamlining and
delivery. For example, some of the actions proposed under the Fair Work theme are similar to actions underway by the Commission Fair Work
workstream. In addition, it will be important to build in the work of the PMO as current managers of a regional programme that manages
business case development, facilitates regional discussion and liaises directly with Scottish and UK Governments.   Regional activity should sit
under the RES as an umbrella strategy and the picture should be joined up and coordinated to maximise impact from existing as well as new
resources, including a potential regional intelligence hub.  
37

Page 38

30 
Action 7.1 Action 7.2 Action 7.3 Action 7.4
Transform the Regional Strategy
Working Group (RSWG) into a
Regional Strategy Delivery Group
(RSDG) with additional
representation sought from local
enterprises, NHS and third sector. 
Review and establish a revised
regional governance structure to
support the delivery of the RES.
Create a dedicated RES website to
host the Strategy, information on
enterprise support (link to Action
1.1), communications on
implementation of the RES and
information on the AGD, to include
data from the Regional Intelligence
Hub.
Work with Scottish Government to
establish and resource a Regional
Intelligence Hub for Ayrshire. 
The following sub actions will
support this action:
1. Approach local enterprises to
nominate members.
2. Identify NHS representative.
3. Work with Ayrshire TSIs to
identify third sector
representative.
4. Revise Terms of Reference to
reflect move to delivery group. 
The following sub actions will
support this action:
1. Agree remit/role of partners in
supporting governance review.
2. Undertake regional governance
review informed by legislative
requirements best practice from
elsewhere.
3. Review of existing regional
workstream activity and map
across. 
4. Review the best and most
effective delivery approach for
each priority theme. 
5. Obtain approval from the
AEPB/AEJC. 
The following sub actions will
support this action:
1. Agree funding mechanism
including lead partner
maintenance arrangements to
create brief for web developer.
2. Work with partners to
determine best structure and
content for website.
3. Appoint web developer.
4. Launch regional website.
5. Link with Regional Intelligence
Hub over longer term.
6. Regular review and update of
website. 
The following sub actions will
support this action:
1. Meet with Scottish Government
to determine options.
2. Engage with Glasgow
Intelligence Hub to understand
what best practice looks like and
where it could be adopted.
3. Agree hosting of Hub with
partner organisations.
4. Create costed proposal for
support from Hub from Scottish
Government.
5. Recruit for and launch Hub. 
Key Partners
All RWSG, local enterprises, NHS,
TSIs
Key Partners
Three local authorities, ERG, RSDG
members.
Key Partners
Three local authorities, Chamber of
Commerce, Scottish Enterprise,
private sector, Scottish Government.
Key Partners
Three local authorities, PMO,
Scottish Enterprise, Scottish
Government, Glasgow Intelligence
Hub, NHS, UWS, Ayrshire College.
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
38

Page 39

31 
Action 7.5 Action 7.6 Action 7.7 Action 7.8
Establish requirements for and
create a dedicated resource to lead
on delivery of the RES, linked to the
Regional Intelligence Hub.
Prepare and implement a
Communications Strategy through
establishment of a RES
Communications subgroup.
Host the first annual State of the
Ayrshire Economy event. 
Develop a measurement
framework, review and refresh of
Year 1 Delivery Plan for Year 2
onwards.
The following sub actions will
support this action:
1. Discuss with Scottish
Government as part of Hub
discussions on options.
2. Draw up staffing proposals for
discussion with partners.
3. Agree resource leads and
responsibilities and appoint
staff. 
The following sub actions will
support this action:
1. NAC Communications service to
lead on establishment of a RES
communications subgroup.
2. Creation of a Communications
Strategy encompassing the RES
launch at Business Week,
ongoing RES messaging and
delivery of the RES.
3. Subgroup to advise and input on
development of RES website.
4. Regular review and update of
Communications Strategy. 
The following sub actions will
support this action:
1. Identify members for short-
term working group to develop
State of the Ayrshire Economy
event to take place in June
2024.
2. Agree financial support for
event, including through
discussions with Scottish
Government.
3. With support from ERG, develop
content for 2024 event.
4. Appoint event management
company for 2024 event.
5. Deliver 2024 event. 
The following sub actions will
support this action:
1. RSDG partners and regional lead
(staff resource) to develop a
measurement framework,
building on alignment of
priorities, outcomes and actions
in Appendix 1.
2. RSDG to review and refresh the
Delivery Plan beyond Year 1, for
launch in October 2024. 
Key Partners
Three local authorities, Scottish
Government, UWS
Key Partners
All RSDG partners. 
Key Partners
All RSDG partners, ERG, Scottish
Government.
Key Partners
Regional lead (staff resource), all
RSDG partners.
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term 
39

Page 40

32 
11.0  CROSS-CUTTING THEMES
COMMUNITY WEALTH BUILDING- AT THE HEART OF OUR STRATEGY
Community Wealth Building (CWB) is an overarching theme of our strategy and something that we see as central to enabling partners to achieve
our vision. This reflects the lead role that Ayrshire has had at the forefront of CWB in Scotland, challenging traditional models of economic
development and recognising that the status quo is not working. A set of short-term cross-cutting CWB actions has been developed with the
intention to continue to embed these throughout the work of the RES going forward. 
SKILLS
Skills has been identified as a second cross-cutting theme across the strategy. The three priority themes of Support for Enterprise, Fair Work and
Innovation are all underpinned by skills. There are identified current and predicted future skills gaps across Ayrshire in key industries, and an
immediate need to work in partnership with local industry, further and higher education institutions and our local secondary schools to equip
young people with the skills that are in demand in our region. This will create a skilled local workforce capable of meeting need in key local
industries and growth sectors, in turn creating an attractive environment for inward investment. Recognising this importance, a set of short-
term cross-cutting skills actions has been developed as a priority in year 1. 
DIGITAL
Digital is increasingly becoming a key theme for economic development within the region, with a recognition that the region must be fully
equipped digitally for actions under the key priority themes of Support for Enterprise, Fair Work and Innovation. Similar to CWB and Skills, a set
of Digital cross-cutting actions has been developed to recognise the importance of this theme in year 1.   
40

Page 41

33 
COMMUNITY WEALTH BUILDING ACTIONS
Action 8.1 Action 8.2 Action 8.3 Action 8.4
Review CWB work across Ayrshire
including the CWB Commission and
AGD CWB Programme to support
regional delivery of CWB and the
RES 
Develop options for an Ayrshire
Anchor Network to support regional
delivery of CWB
Respond to requirements of any
forthcoming Scottish Government
legislation on CWB
Refresh the CWB Anchor Charter
and promote adoption of pledges
within Ayrshire Anchor Institutions
The following sub actions will
support this action: 
1. As part of Action 7.1 to review
existing regional workstream
activity, undertake a review of
the CWB Commission workplan
and workstreams.
2. Review of AGD CWB
Programme. 
The following sub actions will
support this action: 
1. Seek input from the CWB
Commission on the
requirements and scope of an
Ayrshire Anchor Network.
2. Consider options for resourcing
the Ayrshire Anchor Network.
3. Develop Terms of Reference for
the Ayrshire Anchor Network. 
The following sub actions will
support this action: 
1. Await outcome of Scottish
Government consultation on
CWB (cross reference with
Innovation).
2. Review implications and
requirements of legislation. 
The following sub actions will
support this action: 
1. Undertake a review of the CWB
Anchor Charter and pledges.
2. Ensure review is undertaken in
alignment with review of CWB
Commission and development
of an Ayrshire Anchor Network.
3. Promote the refreshed CWB
Anchor Charter. 
Links to Outcomes
SE04, FW03, FW04, IN04, HW03,
PC01
Links to Outcomes
SE04, FW03, FW04, IN04, HW03,
PC01
Links to Outcomes
No specific outcome link
Links to Outcomes
FW04
Key Partners
Ayrshire CWB Commission
Key Partners
Ayrshire CWB Commission
Key Partners
Ayrshire CWB Commission, Scottish
Government
Key Partners
Ayrshire CWB Commission
Timescale
Short-term
Timescale
Medium-term
Timescale
Medium-term
Timescale
Short-term
Links to Priorities
SP01, SP02, SP03, SP05, SP06
Links to Priorities
SP01, SP02, SP03, SP05, SP06
Links to Priorities
No specific priority link
Links to Priorities
SP02, SP05
41

Page 42

34 
SKILLS ACTIONS
Action 8.5 Action 8.6 Action 8.7 Action 8.8
Undertake a whole skills mapping
exercise to determine existing and
predicted future skills gaps and
prioritise sectors, linked to education
and training.
Improve access to training and
lifelong learning, with particular
emphasis on industries experiencing
current and predicted skills gaps,
enabling the workforce to adapt to
changing requirements.
Develop training courses around low
carbon skills and other key areas with
skills gaps (Ayrshire College, UWS)
starting at school level and working
with businesses.
Develop frameworks that align
directly to the aspiration of
future skills needs and skills
gaps in FW02, in order to
develop in-work learning
opportunities including
internships and apprenticeship
programmes. 
The following sub actions will support
this action:
1. Create a short-term skills working
group, including local authority
Directors of Education, Ayrshire
College, UWS, SDS, relevant
members of the RSDG and local
enterprises.
2. Undertake a mapping exercise,
with support from external
consultants if required, to
determine the gaps.
3. Make recommendations on
education and training
opportunities to meet the skills
gaps. 
4. Development of skills actions for
Year 2 onwards. 
The following sub actions will support
this action:
1. Develop a Digital Skills for Growth
CWB Pilot in partnership with
SDS, Ayrshire college, UWS,
Microsoft
2. Raise awareness of the Digital
Skills offer including AI and
automation to enhance
employability and ensure
individuals are prepared for the
evolving job landscape.
3. Improve collaboration and
simplify engagement. 
The following sub actions will support
this action:
1. Review current and predicted
skills gaps in the region from
existing research, working with
the ASIP and ASIF. 
2. Convene follow up meeting with
secondary school head teachers
to gain buy-in from schools. 
3. Ayrshire College and UWS to
develop training courses around
low carbon skills, digital and AI
and other sectors with skills gaps. 
4. Engagement with businesses,
Ayrshire College, UWS and
schools to provide training
opportunities linked to
employment in these industries.
The following sub actions will
support this action:
1. RSDG to assess existing in-
work learning
opportunities through
Ayrshire College and the
three local authorities. 
2. Partners to work to
develop new and enhance
existing opportunities to
ensure a consistent offer
directly linked to the
aspiration of future skills
needs and to address skills
gaps.
Links to Outcomes
FW02
Links to Outcomes
FW02
Links to Outcomes
FW02
Links to Outcomes
FW02
Key Partners Key Partners Key Partners Key Partners
42

Page 43

35 
RSDG members, NHS AA local
enterprises
SDS, Ayrshire College, UWS, Microsoft Ayrshire College, UWS, local schools,
LEPs, SDS
LEPs, Ayrshire College
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Timescale
Short-term
Links to Priorities
No specific priority link
Links to Priorities
SP02, SP03, SP04
Links to Priorities
SP01, SP02, SP03
Links to Priorities
SP01, SP03 
43

Page 44

36 
DIGITAL ACTIONS    
Action 8.9 Action 8.10
Develop and deliver a Regional Digital Economy
Masterplan 
Support funding submission(s) to UK Government
for emergent telecommunication technologies
and 5G coverage across the region. 
The following sub actions will support this action:
1. Develop an Ayrshire Digital Economy
Framework. 
2. Stakeholder Engagement and Expansion.
3. Establish a Digital Economy Champion
Network.
4. Establish a baseline.
5. Develop an outline Digital Economy
Masterplan. 
6. Developing a Regional Digital Impact
Assessment Tool. 
7. Develop a Telecoms Industry Engagement
Pilot. 
The following sub actions will support this action:
1. RSDG to work with Digital Economy
Workstream to identify and progress
potential funding opportunities.
2. Support the development of an initial bid to
the UK Government’s 5G Innovation Regions
programme.
Links to Outcomes
SE01
Links to Outcomes
SE01
Key Partners
Digital Economy Workstream,
RSDG, enterprises and industry 
Key Partners
Digital Economy Workstream, Chamber of
Commerce, local authorities, local enterprises
Timescale
Short to Medium term
Timescale
Short-term
Links to Priorities
SP01
Links to Priorities
SP01, SP03, SP04, SP07
44

Page 45

37 
12.0  DELIVERY FRAMEWORK AND ACTION PLAN: YEAR 1
As set out under Culture of Delivery, we will use the first year of our Delivery Plan to develop activity, actions and a governance structure that allows for the
structured delivery of RES actions, backed up by accurate data that allows us to establish baselines and measure the impact of our actions. This includes
supporting the development of a dedicated staffing resource alongside a Regional Intelligence Hub, working with the Scottish Government to secure funding
to allow for both opportunities to be progressed. As part of these actions, the RSDG will develop a robust measurement framework. Table 1 in Appendix 1
sets out an alignment of actions, priorities and outcomes, to allow for cross-referencing. This will be used to develop a measurement framework.
In addition to a governance and resourcing review, Year 1 will involve delivery of some initial actions and baseline mapping to support the development of
future actions over the medium and longer term. An indicative Year 1 programme has been developed, presented in Appendix 2. 
45

Page 46

38 
13.0  REVIEW AND REFRESH
The Ayrshire Regional Economic Strategy was officially launched in June 2023, with the launch of the Year 1 Delivery Plan in October 2023. The
first year of delivery will allow for partnership working to develop and mature and for a governance review to take place that builds on the success
of the Regional Strategy Working Group and becomes a Regional Strategy Delivery Group with additional representation.
Year 1 of delivery will see a series of mapping exercises delivered, under the six priority themes, in order to identify current activity and propose
delivery workstreams that enhance rather than duplicate existing regional activity. In addition, a number of short-term actions will be prioritised
for delivery under the themes of Support for Enterprise, Fair Work and Innovation. Year 1 will also serve as an interim planning year where more
detail is added to the medium- and longer-term actions planned for Year 2 onwards and to allow for these to be refined in accordance with
evidence gathered during the mapping process. 
The intention of the Regional Strategy Working Group is that the RES is adaptive to change and capable of building on progress and opportunities
that arise during the ten-year timeframe. There is a commitment to ensuring an annual review and refresh process is undertaken, which will allow
for current actions to be refined, new actions to be developed and completed actions to be removed. This process will also allow for a review of
the outcomes under the priority themes, to ensure that the RES and the Delivery Plan remain fit for purpose. The refresh of both documents will
be subject to the agreed approval process by the Ayrshire Economic Joint Committee. 
46

Page 47

39 
APPENDIX 1: DELIVERY FRAMEWORK
Table 1: Alignment of Actions, Priorities and Outcomes
Outcome Actions Priorities
Theme: Support for Enterprise
SE01
Improved digital infrastructure for our region, encouraging new residents, new business start-
ups and new investment. 8.9, 8.10, 8.11 SP01, SP03, SP04, SP07
SE02
Enhanced business support services that focus on domestic and global growth, innovation and
procurement support to help retain wealth locally.  1.1, 1.3 SP02, SP03, SP04, SP07
SE03
Improved quantity and quality of business space provision to meet evidenced demand,
particularly for SMEs. 1.4 SP06
SE04
Improved support for the third sector to deliver community wealth, through support, training
and capacity building.  1.5, 1.6, 8.1, 8.2 SP02, SP03, SP04, SP05, SP07
Theme: Fair Work
FW01
Improved access to jobs and fair employment opportunities by addressing barriers faced by
different groups.  2.2, 2.2 SP01, SP02, SP03, SP04
FW02
Improved access to training and lifelong learning, with particular emphasis on industries
experiencing current and predicted skills gaps, enabling the workforce to adapt to changing
requirements.  8.5, 8.6, 8.7, 8.8 SP01, SP02, SP03, SP04
FW03
Employers in the region have adopted Fair Work principles, for example paying the living wage,
offering secure employment contracts and jobs that are fulfilling and offer progression.  2.4, 2.5, 8.1, 8.2 SP02
FW04
Public sector Anchor Institutions spend and employ progressively, setting a benchmark for other
Ayrshire businesses to follow. 2.6, 8.1, 8.2, 8.4 SP02 
47

Page 48

40 
Outcome Actions Priorities
Theme: Innovation
IN01
Adoption and utilisation of innovation assets created through successful delivery of Ayrshire
Growth Deal projects.  3.2, 3.3 SP02, SP04
INO2
Development of effective partnerships across public, private and academic sectors with a view
to fully enabling the transfer of knowledge and technology, stimulating economic opportunity
and leveraging additional investment around innovation activity.   
INO3
Increased levels of R&D (encompassing Business, Higher Education, Government and Private
Non-Profit) within Ayrshire, maximising specific sectoral opportunities and the development of
Innovative Places. 3.4, 3.5 SP02, SP03, SP04
INO4
Continued use of CWB as a mechanism to embrace new economic development practice and
addressing where innovative public sector activity can support wider wellbeing outcomes. 3.6, 8.1, 8.2 SP04
Theme: Good Health & Wellbeing
HW01
Strengthened partnership working between agencies including NHS Ayrshire and Arran, to
ensure a holistic and person-centred approach to support people to fully contribute to the local
economy.   4.2 SP08
HW02
Improved access to childcare, transport and local jobs, to improve quality of life and allow for
individuals’ increased participation in the local economy.  4.3, 4.4, 4.5 SP03, SP08
HW03
More inclusive approach to recruitment by key employers in our region, to support those
experiencing health related barriers to employment to enter or re-enter the labour market.  2.2, 8.1, 8.2 SP02, SP03 
48

Page 49

41 
Outcome Actions Priorities
Theme: Stronger Places & Communities
PC01
Improved infrastructure within our towns and villages, with consideration of 20-minute
neighbourhoods.  5.2, 5.3, 8.1, 8.2 SP03, SP04, SP06
PC02
Improved cultural and social infrastructure which boosts existing cultural and heritage assets,
helps to improve regional identity and pride in place and contributes to growth in the visitor
economy.  5.4 SP07
PC03 Empowerment for our residents and communities to have a stake in improving their place.  5.5 SP01, SP07, SP08
PC04
Improved road infrastructure, better connecting the region with areas of opportunity, and
improved public transport for rural communities. 5.6, 5.7 SP06
Theme: Enhancing Natural Capital
NC01
Better understanding of the natural capital that exists across our region, with proposals to
enhance this for visitor use whilst preserving for future generations.  6.4, 6.6 SP07, SP03
NC02 Development of a regional energy masterplan with a focus on meeting Net Zero targets. 6.2 
NC03 Supporting a just transition to Net Zero.  6.3, 6.4, 6.5, 6.6 SP01, SP02, SP03, SP07 
49

Page 50

42 
APPENDIX 2: INDICATIVE YEAR 1 PROGRAMME
To be finalised on approval of draft Delivery Plan.
50