MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 21 AUGUST 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Peter Wallace 
Attending: David Logan, Head of Legal and Regulatory Support
Shona Barton, Governance Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Bryn Bowker, Area Team Leader
David Moore, Senior Planning Officer
Stuart Ramsay, Senior Planning Officer
Lesley Cuthbertson, Planning Officer
Emma Shaw, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey and Dougie
Philand. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 17
June 2024 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 19
June 2024 at 11.00 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 19
June 2024 at 2.00 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 19
June 2024 at 3.00 pm was approved as a correct record. 
e) The Minute of the Planning, Protective Services and Licensing Committee held on 19
June 2024 at 4.00 pm was approved as a correct record. 
f) The Minute of the Planning, Protective Services and Licensing Committee held on 26
June 2024 was approved as a correct record.

Page 2

g) The Minute of the Planning, Protective Services and Licensing Committee held on 6
August 2024 at 10.00 am was approved as a correct record. 
h) The Minute of the Planning, Protective Services and Licensing Committee held on 6
August 2024 at 11.00 am was approved as a correct record. 
i) The Minute of the Planning, Protective Services and Licensing Committee held on 6
August 2024 at 2.00 pm was approved as a correct record. 
4. ROCKHILL FARM LTD: PROPOSED REDEVELOPMENT OF BARN AND
FARMHOUSE TO FORM SELF-CATERING TOURIST ACCOMMODATION
TOGETHER WITH ERECTION OF SELF-CATERING TOURIST
ACCOMMODATION (3 UNITS), INSTALLATION OF FLOATING JETTY,
LANDSCAPING AND ASSOCIATED INFRASTRUCTURE WORKS:
ROCKHILL, ARDBRECKNISH, DALMALLY (REF: 21/02265/PP) 
The Planning Officer spoke to the terms of the report.  This application site lies within an
area identified as ‘Countryside Area’ where Policy 02 of LDP2 gives a presumption in
favour of sustainable development where it is of an appropriate scale, design, siting and
use for its countryside location, as set out in the relevant sustainable siting and design
policies of LDP2. 
The site lies within a designated Local Landscape Area (formerly Area of Panoramic
Quality) where LDP2 seeks to promote a flexible approach to small scale development in
the Countryside through Policies 02 and 71. 
A total of 44 objections and 6 expressions of support have been received in respect of this
application. There have been no objections received from statutory consultees.  The main
concerns raised by objectors relate to biodiversity, water and drainage, noise and light
emanating from the site and construction vehicles entering the site.  It is the opinion of
Planning Officers that a suite of safeguarding conditions can address these concerns
raised.  It is not considered that the objections raise any complex or technical issues that
have not been addressed in the report of handling and it is not considered that a
discretionary hearing would add value to the planning process. 
The proposed development is considered to be consistent with the provisions of both the
adopted National and Local Policy and it was recommended that planning permission be
granted subject to the conditions and reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development

Page 3

The development shall be implemented in accordance with the details specified on the
application form dated 25.10.2021; supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Site Plan As
Existing
10/010 Rev A 18.03.2024
Site Plan as
Proposed
20/001 Rev E 18.03.2024
Site Plan as
Proposed 1:500
20/001  
Site Plan as
Proposed 1:5000
20/001 Rev E 18.03.2024
Farmhouse &
Barn Plan As
Existing
20/001 Rev B 18.03.2024
Farmhouse &
Barn Elevations
As Existing
20/001 Rev A 01.12.2021
Farm
Guesthouse 
Barn Elevations
as Proposed
20/001 Rev C 18.03.2024
Farmhouse &
Barn Plan as
Proposed
20/001 Rev C 18.03.2024
Drainage and
water supply
layout
21-017-20 Rev C 18.03.2024
Landscape
Planting Plan  
18.03.2024
Cottage A1
Elevation as
Proposed
20/001 Rev A 18.03.2024
Cottage A1, Plan
as Proposed
20/001 Rev A 18.03.2024
Cottage A2
Elevations as
Proposed
20/001 Rev A 18.03.2024
Cottage A2 Plan
as Proposed
20/001 Rev A 18.03.2024
Cottage C
Elevations as
Proposed
20/001 Rev A 18.03.2024
Cottage C Plan
as Proposed 
20/001 Rev A 18.03.2024
Section as
Proposed
20/001 Rev E 18.03.2024
Rendered
Visualisations  
18.03.2024

Page 4

Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Vehicular Access 
No development shall commence until plans and particulars of the means of vehicular
access to serve the development have been submitted to and approved by the
Planning Authority in consultation with the Roads Authority. Such details shall
incorporate:   
i) Details of upgrades to the existing private access track (within ownership control of
the applicant) with intervisible passing places required at intervals of no more than
150m.Track width to be a minimum of 3.7m. Level 2m verge/step off on one side of
track required; 
ii) Total length of unpaved access track (within ownership control of the applicant)
surface requires upgrade including grading/leveling of surface, voids, potholes,
rutting to be filled, levelled and compacted, using bituminous bound material and
regularly maintained as required;
iii) Details of parking and turning for two vehicles for each of the proposed self catering
units; parking and turning for three vehicles for the farmhouse and 2 for the barn
conversion:
iv) Details of a turning head to Figure 18 of the Roads Development Guide to be
provided within the farm yard area 
The upgrades to the existing private access track (within ownership control of the
applicant) shall be completed prior to the development first being brought into use. 
Reason: In the interests of road safety. 
3. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until
details of the intended means of surface water drainage to serve the development
have been submitted to and approved in writing by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
Regard should be had to SEPA’s consultation comments in relation to the proposed
development. 
4. PP – Landscaping Scheme and Biodiversity Enhancement Measures 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the

Page 5

Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained; Details shall include
tree protection measures to ensure that the trees which are located along the
boundary of the eastern side of plot 7 are retained and maintained in perpetuity. 
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
v) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance;
vi) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity and in order to comply with the requirements of NPF4 Policy 3. 
Note to Applicant 
The applicant is advised to observe the content of the consultation response which has
been received from the Councils Biodiversity Officer. 
5. PP – Finishing Materials 
Notwithstanding the effect of Condition 1, no development shall commence until written
details of the proposed external finishing materials to be used in the construction of the
proposed development including details of the proposed decking have been submitted
to and approved in writing by the Planning Authority. The development shall thereafter
be completed using the approved materials or such alternatives as may be agreed in
writing with the Planning Authority.

Page 6

Reason: In order to integrate the development into its surroundings. 
6. PP – Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
Regulatory requirements for private water supplies should be discussed with the
Council’s Environmental Health Officers in the first instance. 
7. PP – Outdoor Access Plan 
No development shall commence until a detailed Outdoor Access Plan of public
access across the site (as existing, during construction and following completion) has
been submitted to, and approved in writing by, the Planning Authority. The plan shall
include details showing:  
i) All existing access points, paths, core paths, tracks, rights of way and other routes
(whether on land or inland water), and any areas currently outwith or excluded from
statutory access rights under Part One of the Land Reform (Scotland) Act 2003,
within and adjacent to the application site; 
ii) Any areas proposed for exclusion from statutory access rights, for reasons of
privacy, disturbance or effect on curtilage related to proposed buildings or
structures; 
iii) All proposed paths, tracks and other routes for use by walkers, riders, cyclists, all-
abilities users, etc. and any other relevant outdoor access enhancement (including
construction specifications, signage, information leaflets, proposals for on-going
maintenance etc.); 
iv) Any diversion of paths, tracks or other routes temporary or permanent, proposed as
part of the development (including details of mitigation measures, diversion works,
duration and signage).

Page 7

The approved Outdoor Access Plan, and any associated works, shall be implemented
in full prior to the first occupation of the development or as otherwise may be agreed
within the approved plan. 
Reason: In order to safeguard public access both during and after the construction
phase of the development. 
Note to Applicant: 
The applicant is advised to observe the consultation response which has been
received from the Council’s Access Manager. 
8. PP – Contaminated Land 
No development shall commence until an assessment of the condition of the land has
been undertaken, submitted and approved in writing by the Planning Authority.  The
assessment shall determine the nature and extent of any contamination on the site and
identify any potential risks to human health, the water environment, property or
designated ecological sites. 
Where contamination is identified, then a detailed remediation scheme to bring the site
to a condition suitable for the intended use must be prepared and be subject to the
approval in writing of the Planning Authority. The scheme must include all works to be
undertaken, proposed remediation objectives and remediation criteria. The scheme
must ensure that the site will not qualify as contaminated land under Part 2A of the
Environmental Protection Act 1990 in relation to the intended use of the land after
remediation. 
Any approved remediation scheme must be carried out in accordance with its terms
prior to the commencement of development with the exception of those actions
required to carry out remediation unless otherwise agreed in writing by the Planning
Authority. Following completion of measures identified in the approved remediation
scheme, a verification report that demonstrates the effectiveness of the remediation
must be produced, and is subject to the approval in writing of the Planning Authority. 
Reason:  In order to ensure that contamination issues on the site have been fully
investigated and remediated. 
Note to Applicant: 
Regulatory requirements for land contamination issues should be discussed with the
Council’s Environmental Health Officers in the first instance. 
The floating jetty shall be used solely for recreational purposes by the residents of
Rockhill Farm Estate and for no commercial purposes. 
Reason:  To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
9. That the Farm Guesthouse (1) and Barn Conversion (4), as annotated on Drawing No
20/001, Rev E – Site Plan As proposed, shall not be subdivided and used solely for the
provision of 2 separate self catering holiday letting units.

Page 8

Reason:  To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
10. PP– Short Term Residential Accommodation (e.g. Holiday Letting) 
Notwithstanding the provisions of Class 9 of the Town and Country Planning (Use
Classes) (Scotland) Order 1997 the residential accommodation hereby approved shall
be used for short term holiday occupancy only and not as a main residence and shall
not be occupied by any family, group or individual for a cumulative period of more than
three calendar months in any one year. A register showing dates of arrivals and
departures shall be maintained at the premises and shall be available at all reasonable
times for inspection by the Planning Authority. 
Reason: To define the permission on the basis of the Planning Authority’s assessment
of the use applied for. 
Note to Applicant: 
• For the avoidance of doubt this permission only provides for the occupation of the
premises on a short term basis on the grounds that the development is unsuited to
full time residential occupation. Specifically the occupation of the premises as a
dwelling shall require the benefit of a separate planning permission. 
11. PP – Site Waste Management Plan 
No development shall commence until a detailed Site Waste Management Plan
(SWMP) during construction has been submitted to, and approved in writing by, the
Planning Authority. The plan shall include details for the management of pollution
prevention monitoring and mitigation measures for all construction activities 
The approved SWMP shall be implemented in full prior to the first occupation of the
development or as otherwise may be agreed within the approved plan. 
Reason:  In order to ensure that effective provision for waste/recycling is provided. 
12. No development shall commence until full details of any external lighting to be used
within the site has been submitted to and approved in writing by the Planning Authority.
Such details shall include the location, type, angle of direction and wattage of each
light which shall be so positioned and angled to prevent any glare or light spillage
outwith the site boundary. 
No external lighting shall be installed except in accordance with the duly approved
scheme. 
Reason: In order to avoid light pollution in the interest of amenity. 
Note to Applicant: 
All external lighting should be designed in accordance with the Scottish Government’s
Guidance Note “Controlling Light Pollution and Reducing Light Energy Consumption”
2007, Annexes A and B. Site specific advice may be obtained by contacting the
Council’s Environmental Health Officers.

Page 9

13. Notwithstanding the provisions of Condition 1, co construction plant and/or machinery
shall be operated on the site outwith the following times: 
• Monday to Friday: 08:00-18:00
• Saturday: 08:00-13:00
• Sunday: No noisy work to be carried out at any time 
Reason: In order to protect the amenity of the area in terms of nuisance. 
(Reference: Report by Head of Development and Economic Growth dated 7 August 2024,
submitted) 
Councillor Mark Irvine left the meeting during consideration of the foregoing item. 
5. CALA MANAGEMENT LIMITED:  APPROVAL OF MATTERS SPECIFIED IN
CONDITIONS 2, 3, 6, 7, 8, 9, 11, 12, 13, 15, 16 AND 17 OF CONSENT
18/01444/PP (PPA-130-2071):  ERECTION OF RESIDENTIAL
DEVELOPMENT WITH ASSOCIATED ACCESS, INFRASTRUCTURE,
OPEN SPACE, LANDSCAPING AND MISCELLANEOUS WORKS:  LAND
NORTH OF CARDROSS PRIMARY SCHOOL, BARRS ROAD, CARDROSS: 
(REF: 23/00144/AMSC) 
This application was considered at a discretionary hearing on 17 June 2024 where the
Committee agreed to continue consideration to allow Members to seek advice of Officers
on the preparation of a competent Motion. 
It was noted that only those Members present today that attended the discretionary
hearing could take part in the determination of the application. 
Councillors John Armour and Audrey Forrest left the meeting at this point. 
Motion 
To agree that the AMSC permission be approved as per Officer recommendation within
the main report, with the minor correction that the referenced drainage strategy within the
approved supporting documents is amended to the Issue 5 drainage strategy submission
dated 10.6.24. 
Moved by Councillor Gordon Blair, seconded by Councillor Liz McCabe. 
Amendment 
The Planning, Protective Services and Licensing Committee; 
• Notes that satisfactory operation of the proposed drainage scheme relies on
attenuation provided by an existing pond located on third party land to the south-west
of the application site. 
• Considers the pond is an integral component of the overall drainage solution for the
site as water discharged from the development will pass through this existing water
feature prior to entering the Geilston Burn.

Page 10

• Recognises that the developer has put forward a competent Surface Water Drainage
(SuDS) Scheme, as required by condition 12, but further notes that the proposal also
includes for the redirection and the discharge of unattenuated surface water flow from
the existing housing development at Kilmahew Avenue, Grove and Court into this pond
that will increase flows into the pond. 
• Finds that insufficient technical details have been submitted to confirm the attenuation
properties of the pond and its capacity to accommodate the additional surface water
discharge. 
• Finds that insufficient technical details have been submitted to demonstrate that the
proposed drainage scheme will not give rise to unacceptable harm through flooding to
the residential property known as ‘The Glen’ should the combined discharges lead to
the pond overtopping its sidewalls. 
• Therefore finds that condition 11 has not been satisfied, and consequently refuses the
Approval of Matters the subject of Conditions (AMSC) permission. 
Moved by Councillor Kieron Green, seconded by Councillor Paul Kennedy. 
A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Blair  Councillor Brown
Councillor Kain  Councillor Green
Councillor McCabe  Councillor Hardie
Councillor Wallace  Councillor Howard    
Councillor Kennedy 
The Amendment was carried by 5 votes to 4 and the Committee resolved accordingly. 
Decision 
The Planning, Protective Services and Licensing Committee; 
• Noted that satisfactory operation of the proposed drainage scheme relied on
attenuation provided by an existing pond located on third party land to the south-west
of the application site. 
• Considered the pond was an integral component of the overall drainage solution for
the site as water discharged from the development would pass through this existing
water feature prior to entering the Geilston Burn. 
• Recognised that the developer had put forward a competent Surface Water Drainage
(SuDS) Scheme, as required by condition 12, but further noted that the proposal also
included for the redirection and the discharge of unattenuated surface water flow from
the existing housing development at Kilmahew Avenue, Grove and Court into this pond
that would increase flows into the pond. 
• Found that insufficient technical details had been submitted to confirm the attenuation
properties of the pond and its capacity to accommodate the additional surface water
discharge.

Page 11

• Found that insufficient technical details had been submitted to demonstrate that the
proposed drainage scheme would not give rise to unacceptable harm through flooding
to the residential property known as ‘The Glen’ should the combined discharges lead
to the pond overtopping its sidewalls. 
• Therefore found that condition 11 had not been satisfied, and consequently refused the
Approval of Matters the subject of Conditions (AMSC) permission. 
(Reference: Report by Head of Development and Economic Growth dated 7 March 2024
and supplementary report number 1 dated 13 June 2024, submitted) 
Councillors John Armour and Audrey Forrest returned to the meeting. 
6. TORLOISK ESTATE: CONVERSION AND EXTENSION OF STONE BARN
TO FORM DWELLINGHOUSE, INSTALLATION OF SEPTIC TANK AND
FORMATION OF VEHICULAR ACCESS: LAND WEST OF LAGGANULVA
FARM, ULVA FERRY, ISLE OF MULL (REF: 23/00185/PP) 
The Planning Officer spoke to the terms of the report.  This application was presented to
the PPSL Committee on 22 May 2024 and the Committee agreed to request from
Planning Officers information on what impact this proposed development would have on
access to, and operation of, the remaining agricultural land in terms of Police 83 of LDP2
– Safeguarding Agricultural and Croft Land. 
Planning Officers have sought further information from both the Applicant and the tenant
farmer and a request was made to continue consideration of the application to the PPSL
Committee meeting on 18 September 2024 to allow for the requested information to be
prepared. 
Decision 
The Committee agreed to note the content of the report and continue consideration of the
application to the meeting of the PPSL Committee on 18 September 2024 to allow for the
requested information to be prepared. 
(Reference: Report by Head of Development and Economic Growth dated 8 May 2024,
supplementary report number 21 May 2024, supplementary report number 2 dated 10
June 2024 and supplementary report number 3 dated 12 August 2024, submitted) 
7. MRS HELEN TOMOLILLO: CHANGE OF USE OF FORMER CHURCH TO
FORM DWELLINGHOUSE, FORMATION OF VEHICULAR ACCESS AND
DRIVEWAY, ERECTION OF GARAGE/CARPORT, FORMATION OF
OPENING IN BOUNDARY WALL TO PROVIDE PEDESTRIAN ACCESS
AND ASSOCIATED WORKS: KILMICHAEL GLASSARY PARISH CHURCH
(REF: 23/01367/PP) 
The Area Team Leader spoke to the terms of the report.  Before proceeding with the
presentation he pointed out a couple of minor errors in the report which did not have a
material bearing on the recommendation before Members.  The first being at section A(1)
– he confirmed that it was a change of use from Church Class 10 to Dwellinghouse Class
9, and not Class 4.  The second being at Section 7 of Appendix A – reference is made to a
private treatment plant.  It was confirmed it was a private sewage pump. The intention of
the Applicant was to connect to Scottish Water’s waste water treatment works.

Page 12

A Listed Building Consent Application reference no 23/01369/LIB) has been submitted in
association with this planning application and a separate report is also before Members. 
The listed building application considers in greater detail the physical alterations proposed
to the listed Parish Church and Churchyard wall. 
In terms of the Local Development Plan 2 (LDP2) the site’s location straddles
Kilmichael/Bridgend village within a Settlement Area and Countryside Area.   
Officers are of the view that the physical alterations to the listed building and listed wall
would preserve the special interest of both listed structures.  However, Officers consider
that the adjoining graveyard forms a key part of the setting of the Listed Parish Church,
making a significant and positive contribution to its sense of place, understanding,
experience and appreciation.  It is considered that the proposed change of use of the
church to a residential dwelling would significantly alter the relationship the Parish Church
would have with its graveyard, to the extent that the proposed development would have an
adverse impact on the setting of the listed building. 
Officers are also of the view that the proximity of the proposed dwelling to an existing
publicly accessible graveyard are land uses that would be incompatible with one another,
with resultant harm to the privacy of future occupants of the proposed dwelling, and the
privacy and quiet use of the graveyard by the public. 
It is acknowledged that a number of representations, both in support and in objection,
have been received in response to this proposal.  However, this is a local application that
conflicts with the Development Plan and it is considered that the proposal does not raise
complex or novel issues that require discussion by way of a hearing.  As such, it is
considered unlikely that a pre-determination hearing would add value to the decision
making process. 
It was recommended that planning permission be refused for the reasons detailed in the
report 
Decision 
The Committee agreed to refuse planning permission for the following reasons: 
1. Kilmichael Glassary Parish Church is a Category B Listed Building and its associated
adjoining graveyard forms part a key part of its setting, making a significant and
positive contribution to its sense of place, understanding, experience and appreciation. 
The proposed change of use of the former parish church to a residential dwelling
would significantly alter the relationship the Category B Listed Building Parish Church
would have with its associated graveyard, to the extent that the proposed development
would have an unacceptable adverse impact on the setting of the listed building. 
2. The operational graveyard adjoining the proposed dwelling is accessible to the public
and attracts visitors who would have a reasonable expectation to move freely around
the public space at any time during night and day. Noting the proximity of the
graveyard to the proposed dwelling, it is considered that the privacy of future
occupants of the dwelling would be unacceptably harmed 
In addition, by nature of the change of use proposed, future occupants of the proposed
dwelling would overlook the adjoining graveyard, and likely generate noise and

Page 13

disturbance within close proximity of the graveyard. The loss of privacy, and high
likelihood of noise and disturbance would have a materially harmful impact on the
general public using this space, who would have a reasonable expectation of the
operational graveyard being a quiet and private place for reflection and contemplation 
As such, it is considered that the proposed residential conversion of the vacant church
would be incompatible with the existing adjoining use of an open and operational
graveyard, with reference to the resultant identified harm to the amenity of future
residents and users of the publically accessible graveyard. As such, the proposal
would be contrary to LDP2 policies 01, 05, 08,14, 66c) and NPF4 Policy 14c). 
3. With reference to comments received from the West of Scotland Archaeology Service,
the site has a long history and, if confirmed, the presence of highly significant buried
remains could result for a recommendation of refusal.  It is noted that excavation works
to install infrastructure required to facilitate the proposed change of use would be
within the graveyard. In the absence of any archaeological evaluation works
undertaken prior to the determination of the planning application, there is significant
uncertainty regarding the effect of the proposal in archaeological terms. Therefore the
proposed development is considered to be contrary with NPF4 Policy, 7(o) and ABC
LDP2 Policy 21, Sites of Archaeological Importance.   
(Reference: Report by Head of Development and Economic Growth dated 7 August 2024,
submitted) 
8. MRS HELEN TOMOLILLO: EXTERNAL AND INTERNAL ALTERATIONS
TO FORMER CHURCH TO FORM DWELLINGHOUSE INCLUDING
FORMATION OF OPENING IN BOUNDARY WALL TO PROVIDE
PEDESTRIAN ACCESS AND ASSOCIATED WORKS: KILMICHAEL
GLASSARY PARISH CHURCH (REF: 23/01369/LIB) 
The Area Team Leader spoke to the terms of the report.  Listed building consent is sought
for a number of external and internal alterations to Kilmichael Glassary Parish Church
(Category B Listed) and Churchyard Wall (also Category B Listed) as part of the
conversion of the church to a dwellinghouse. 
While the proposed change of land use to a dwellinghouse requires planning permission,
it does not require listed building consent.  As such, the assessment of the proposed
change of land use is contained with the report of handling for planning application
reference 23/01367/PP which was also before Members today. 
It is noted that a significant proportion of the representations received in response to this
listed building application raise points more relevant to the accompanying planning
application rather than this proposal. 
This application for listed building consent relates solely to the physical changes proposed
to the Church and Churchyard wall.  For the reasons set out in Appendix A of the report, it
is considered the physical alterations proposed to both the listed Churchyard Wall and
Parish Church building would preserve the special interest of both listed
building/structures and its setting.   
On this basis, subject to conditions, Officers consider that the proposal would meet the
requirements of Section 14 of the Act and relevant policies and it was recommended that
listed building consent be granted for the proposed alterations.

Page 14

Decision 
The Committee agreed to grant listed building consent subject to the following conditions
and reasons and agreed to delegate authority to Officers to include an additional condition
(no 3) to ensure access to the churchyard was maintained for the public during the
construction process: 
Standard Time Limit Condition  (as defined by Regulation) 
Additional Conditions 
1. LIB - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 13.07.2024, supporting information, and the approved drawings
listed in the table below. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan  2906/103  14.07.2024
Existing Floor
Plan
2906/103  14.07.2024
Existing North
Elevation
2906/106  14.07.2024
Existing South
Elevation
2906/104  14.07.2024
Existing West
Elevation
2906/105  14.07.2024
Existing East
Elevation 
2906/107  14.07.2024
External Stair
Sections A-A
Existing and
Proposed 
2906/117  27.07.2024
Proposed North
Elevation
2906/112  20.07.2024
Proposed South
Elevation
2906/110  20.07.2024
Proposed West
Elevation
2906/111  20.07.2024
Proposed East
Elevation 
2906/113  20.07.2024
Proposed
Ground Floor
Plan
2906/108  14.07.2024
Proposed First
Floor Plan 
2906/109  14.07.2024
Proposed Site
Plan 
2906/102  20.07.2024
Rooflight Detail  CR_CRSF_LS_B  20.07.2024
Rooflight
Technical Data
Form QD349  20.07.2024

Page 15

Sheet
Window Details,
Heritage System
Data Sheet
BR_IS25 Rev G  20.07.2024
Window
Schedule 1-2
2906/118  20.07.2024
Window
Schedule 2-2
2906/119  20.07.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
This consent will last only for three years from the date of this decision notice, unless
the development has been started within that period [See section 16 of the Planning
(Listed Building and Conservation Areas) (Scotland) Act 1997 (as amended).] 
2. The proposed works shall not commence until a detailed scheme to demonstrate how
the existing pulpit and pews are to be incorporated into the proposal has been
submitted to and approved in writing by the Planning Authority.   
Thereafter the proposal shall be completed in accordance with the approved details. 
Reason: In order to safeguard the special interest of the Category B Listed Parish
Church. 
(Reference: Report by Head of Development and Economic Growth dated 7 August 2024,
submitted) 
The Chair ruled, and the Committee agreed, to take a 15 minute break at this point. 
The Committee reconvened at 1.35 pm with all Members present as per the sederunt with
the exception of Councillor Mark Irvine.

Page 16

9. LINK GROUP LTD: PROPOSAL OF APPLICATION NOTICE FOR MIXED
USE DEVELOPMENT COMPRISING RETAIL UNITS (CLASS 1);
FINANCIAL, PROFESSIONAL & OTHER SERVICES UNITS (CLASS 2);
FOOD & DRINK UNITS (CLASS 3) INCLUDING DRIVE THROUGHS, HOT
FOOD TAKEAWAYS & PUBLIC HOUSE; BUSINESS UNITS (CLASS 4)
INCLUDING OFFICES AND LIGHT INDUSTRY; STORAGE &
DISTRIBUTION UNITS (CLASS 6); HOTEL (CLASS 7); RESIDENTIAL
DEVELOPMENT (DUNBEG PHASE 4) (CLASS 9 HOUSES & SUI GENERIS
FLATS) INCL. SOCIAL HOUSING, PRIVATE HOUSING, STUDENT
ACCOMMODATION & RETIREMENT ACCOMMODATION WITH SHARED
COMMUNITY SPACE, ASSEMBLY & LEISURE (CLASS 11); SITE FOR
PARK & RIDE FACILITY; EV CHARGING POINTS; NEW ROUNDABOUT
ON A85, DISTRIBUTOR ROAD & OTHER ROADS, PARKING & SERVICING
AREAS; GROUND REMODELLING; ABOVE & BELOW GROUND
INFRASTRUCTURE INCLUDING SUDS; OPEN SPACE & LANDSCAPING
INCLUDING BIODIVERSITY ENHANCEMENT; MODIFICATION TO CORE
PATH NETWORK; PEAT MANAGEMENT & RESTORATION: LAND WEST
OF DUNSTAFFNAGE MAINS FARM, DUNBEG (REF: 24/01214/PAN) 
The Senior Planning Officer spoke to the terms of the report.  Three separate Proposal of
Application Notices (PANs) have been submitted for future development at Dunbeg.  All of
the PANs relate to the next phases of development for residential, commercial, community
facilities and roads infrastructure associated with the approved Masterplan (reference
16/03368/MPLAN) and LDP2 Allocations and Objectives. 
This PAN seeks to include all proposed development associated with the future
development of Dunbeg (Phase 4).  The wider site is a mixture of primarily south facing
hillside and outcrops, undulating land and lower flat land nearer the A85 which has some
deep peat deposits within it, particularly in respect of the area of land identified for the
commercial use and access road next to the proposed “halfway” roundabout.  The area is
also subject to flooding. 
The site is bisected by National cycle route C198 between Ganavan and Dunbeg and
there are many informal paths on the northern parts of the site on the hillsides which are
used for recreational purposes by residents and visitors.  Core Path C163 also traverses
the northern edge of the larger site. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that the following matter be
given consideration in finalising any future planning application submission –

Page 17

• Opportunities for allowing access to commercial areas via sustainable public transport
and minimising use of cars would be welcome. 
(Reference: Report by Head of Development and Economic Growth dated 21 August
2024, submitted) 
10. LINK GROUP LTD: PROPOSAL OF APPLICATION NOTICE FOR
PROPOSED MIXED USE DEVELOPMENT COMPRISING RETAIL UNITS
(CLASS 1); RESIDENTIAL DEVELOPMENT (DUNBEG PHASE 4) (CLASS 9
HOUSES AND SUI GENERIS FLATS) INCLUDING SOCIAL HOUSING,
PRIVATE HOUSING, STUDENT ACCOMMODATION AND RETIREMENT
ACCOMMODATION WITH SHARED COMMUNITY SPACE, ASSEMBLY
AND LEISURE (CLASS 11); EV CHARGING POINTS; NEW ROUNDABOUT
ON A85, DISTRIBUTOR ROAD AND OTHER ROADS, PARKING AND
SERVICING AREAS; GROUND REMODELLING; ABOVE GROUND AND
BELOW GROUND INFRASTRUCTURE INCLUDING SUDS; OPEN SPACE
AND LANDSCAPING INCLUDING BIODIVERSITY ENHANCEMENT;
MODIFICATION TO CORE PATH NETWORK; AND PEAT MANAGEMENT
AND RESTORATION: LAND WEST OF DUNSTAFFNAGE MAINS FARM,
DUNBEG (REF: 24/01212/PAN) 
The Senior Planning Officer spoke to the terms of the report.  This Proposal of Application
Notice (PAN) relates primarily to intended future residential development, associated
community facilities, and other necessary infrastructure and restoration/landscaping
works. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that the following matter be
given consideration in finalising any future planning application submission – 
• Opportunities for allowing access to commercial areas via sustainable public transport
and minimising use of cars would be welcome. 
(Reference: Report by Head of Development and Economic Growth dated 21 August
2024, submitted)

Page 18

11. LINK GROUP LTD: PROPOSAL OF APPLICATION NOTICE FOR MIXED
USE DEVELOPMENT COMPRISING RETAIL UNITS (CLASS 1);
FINANCIAL, PROFESSIONAL AND OTHER SERVICES UNITS (CLASS 2);
FOOD AND DRINK UNITS (CLASS 3) INCLUDING DRIVE THROUGHS,
HOT FOOD TAKEAWAYS AND PUBLIC HOUSE; BUSINESS UNITS
(CLASS 4) INCLUDING OFFICES AND LIGHT INDUSTRY; STORAGE AND
DISTRIBUTION UNITS (CLASS 6); HOTEL (CLASS 7); SITE FOR PARK
AND RIDE FACILITY; EV CHARGING POINTS; NEW ROUNDABOUT ON
A85, DISTRIBUTOR ROAD AND OTHER ROADS, PARKING AND
SERVICING AREAS; GROUND REMODELLING; ABOVE GROUND AND
BELOW GROUND INFRASTRUCTURE INCLUDING SUDS; OPEN SPACE
AND LANDSCAPING INCLUDING BIODIVERSITY ENHANCEMENT;
MODIFICATION TO CORE PATH NETWORK; AND PEAT MANAGEMENT
AND RESTORATION: LAND WEST OF DUNSTAFFNAGE MAINS FARM,
DUNBEG (REF: 24/01213/PAN) 
The Senior Planning Officer spoke to the terms of the report.  This Proposal of Application
Notice (PAN) relates primarily to intended future mixed commercial development and
other necessary infrastructure and restoration/landscaping works. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that the following matter be
given consideration in finalising any future planning application submission – 
• Opportunities for allowing access to commercial areas via sustainable public transport
and minimising use of cars would be welcome. 
(Reference: Report by Head of Development and Economic Growth dated 21 August
2024, submitted) 
12. TAYLOR WIMPEY: PROPOSAL OF APPLICATION NOTICE FOR
RESIDENTIAL DEVELOPMENT TO INCLUDE ACCESS, ROADS, OPEN
SPACE, LANDSCAPING, DRAINAGE AND OTHER ASSOCIATED WORKS:
LAND AT GEILSTON FARM, CARDROSS ROAD/A814, CARDROSS (REF:
24/01391/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed site is located
on open farmland set on the western edge of the village of Cardross, to the south of the
main A814 road.  In terms of the adopted Local Development Plan 2 (2024), the site is
located within the designated Helensburgh and Lomond green belt and in terms of spatial
strategy, is within the Helensburgh and Lomond Growth area.  The proposed site bounds
the Cardross settlement area to the east.  The site itself if not subject to any additional

Page 19

constraints, although the woodland area to the immediate east of the site, Geilston Burn,
is a designated SSSI (Site of Special Scientific Interest) and an area of ancient woodland. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that the following matters be
given consideration in finalising any future planning application submission – 
• Land prone to flooding.  Demonstrate through not just the production of surface water
drainage and attenuation for land being built on but also for land elsewhere to prevent
flooding to neighbouring properties and land eg railway line. 
• Capacity of Scottish Water infrastructure to cope with additional connections to
sewage treatment works. 
• Capacity of local primary school. 
• Consider housing needs of area itself in terms of size of houses.   
• Consider more than 25% affordable housing. 
• Capacity of road through the village of Cardross to accommodate additional traffic and
construction traffic. 
(Reference: Report by Head of Development and Economic Growth dated 1 August 2024,
submitted) 
Councillor Peter Wallace left during consideration of the foregoing item. 
13. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ1 2024/25 
A report providing an update on the performance of the Development Management
Service for the reporting period FA1 2024/25 was considered. 
Decision 
The Committee considered and noted the content of the report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 1 August 2024, submitted)

Page 20

14. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
A report summarising a recent decision by Scottish Ministers in relation to a Local Review
Board appeal decision (reference 23/0003/LRB) which was called in for Ministers
determination was before the Committee for information. 
Decision 
The Committee noted the content of the report. 
(Reference: Report by Head of Development and Economic Growth dated 21 August
2024, submitted)