Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Ayrshire Economic Joint Committee 
A Special Meeting of the Ayrshire Economic Joint Committee of North Ayrshire
Council will be held remotely on Monday, 15 January 2024 at 14:30 to consider the
undernoted business. 
Meeting Arrangements - Fully Remote
This meeting will be held remotely in accordance with the provisions of
the Local Government (Scotland) Act 2003.  Where possible, the meeting
will be live-streamed and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.  In the event that live-streaming is not possible, a
recording of the meeting will instead be available to view at this location. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Ayrshire Growth Deal (AGD) Community Wealth Building Change
Request
Submit report by the Executive Director (Place) (North Ayrshire Council)
on the summary mid term review of the Ayrshire Growth Deal (AGD)
Community Wealth Building (CWB) Programme and seeking approval to
extend the programme by one year (copy enclosed). 
3 Ayrshire Skills Investment Fund (ASIF) Governance
Submit report by the Chief Executive (North Ayrshire Council) seeking
approval of the detailed governance arrangements for the Ayrshire Skills
and Investment (ASIF) sub-committee of the Ayrshire Economic Joint
Committee (AEJC) including the Terms of Reference and Standing
Orders (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Ayrshire Economic Joint Committee Sederunt 
North Ayrshire Council
Councillor Marie Burns
Councillor Joe Cullinane
Councillor Anthony Gurney
Craig Hatton
Russell McCutcheon
Neale McIlvanney
Louise Kirk  
East Ayrshire Council
Councillor Douglas Reid
Councillor Iain Linton
Councillor Maureen McKay
Councillor Stephen Canning (sub)
Councillor Barry Douglas (sub)
Councillor William Lennox (sub)
Eddie Fraser
David McDowall
Graham Saunders  
South Ayrshire Council
Councillor Martin Dowey
Councillor William Grant
Councillor Bob Pollock
George Hunter
Theo Leijser
Mike Newall  
Others
Simon Fraser, Spirit Aerosystems
Jane Martin, Scottish Enterprise
Angela Cox, Ayrshire College
Paul Zealey, Skills Development Scotland   
Chair: 
Apologies: 
Attending: 
3

Page 4

4

Page 5

AYRSHIRE ECONOMIC JOINT COMMITTEE
MEETING – 15 JANUARY 2024
Report by North Ayrshire Council
AYRSHIRE GROWTH DEAL COMMUNITY WEALTH BUILDING PROGRAMME
PURPOSE
1. To present the summary mid term review of the Ayrshire Growth Deal (AGD)
Community Wealth Building (CWB) Programme and to seek approval to extend the
programme by one year.
RECOMMENDATIONS
2. It is recommended that the Ayrshire Economic Joint Committee:
(i) Approves the project change request proposal to extend the programme by
one year, noting that the proposal has been supported by the Scottish
Government.
BACKGROUND
3. The aim of the AGD CWB Programme is ‘to develop an Ayrshire approach to
Community Wealth Building that enhances wealth, ensures fair and meaningful
work, and creates successful places throughout the region’.  The programme seeks
to develop resilient, inclusive local economies, with more local employment and a
large and more diverse business base.  The programme focuses on support to
businesses around the themes of procurement, employment, ownership and
assets.
4. The programme has three key elements to support achievement of the aim:
• CWB Business Locality Officers: based within each local authority who work
with local enterprises to facilitate CWB across the region;
• CWB Fund: a £1 million fund to support place-based activity and the work of
the CWB Business Locality Officers;
• Fair Work Ayrshire: a dedicated service that works across the Ayrshire region
to support employers to adopt Fair Work principles.
5. The programme commenced in April 2021 with an original timescale of three years
and an anticipated completion date of March 2024.  The overall programme budget
is £3 million, funded entirely by the Scottish Government.  Two thirds of the budget
supports employing a total of thirteen members of staff to deliver the programme.
This includes a Programme Manager, Fair Work Ayrshire (FWA) Programme
Agenda Item 2
5

Page 6

Manager and two FWA Delivery Officers, in addition to the nine Business Locality
Officers.  Project management is provided by North Ayrshire Council as lead
authority. The Programme Manager is based within the Economic Policy Team
with lead officer oversight provided by the Senior Manager for Economic Policy.
Associated financial and HR services are resourced within the wider Council.  In
addition, the Fair Work Ayrshire Programme is also hosted by the Council’s
Employability Team. 
6. The programme aligns with existing resources within the three local authorities,
including business development teams, employability programmes and economic
development services.  Business Locality Officers are based within the Economic
Development Service of each local authority.  This allows the AGD CWB service
provided to enterprises to be aligned with the wider business support offer and for
cross-referral of businesses to add value.  A programme Steering Group,
comprising regional Business Support leads from across the three Authorities,
meets monthly to discuss progress. 
7. The programme is currently performing well against the targets set out in the
approved Full Business Case and in some cases exceeding the key outputs. 
However, there have been challenges in achieving all outputs and outcomes
mainly due to delays in recruitment in the early stages of delivery.  The full staffing
complement was not realised until April 2022, one year after the original intended
start date.  This condensed the delivery period of the programme, resulting in an
underspend in terms of salary costs and grant funding for businesses. 
8. A summary mid-term review document has been prepared by the Programme
Manager.  This has been approved by the AGD CWB Programme Steering Group
and is attached as Appendix 1.  This outlines the achievements of the programme.
It highlights that real momentum and confidence has been gained within the
delivery team and more widely amongst the regional business community. The
underpinning recommendations within the review for a one-year extension aim to
enable all outputs and outcomes to be realised. 
9. The Programme Manager has worked closely with members of the Steering Group
to develop a fully funded extension proposal that uses existing regional funding to
extend the contracts of eight of the Business Locality Officers until March 2025. 
The post extensions are being funded through alternative sources including the
Shared Prosperity Fund. This, combined with the underspend from the programme,
will allow for a full year’s extension without the need for additional resource from
the AGD.  The underspend will support the extension of the Programme Manager
and one FWA Delivery Officer.  The FWA Programme Manager has already been
aligned to the ADG Ayrshire Skills Investment Programme.   
10. The Ayrshire Regional Economic Strategy (RES), launched in October 2023,
recognises the impacts made by the AGD CWB Programme to date.  The RES is
underpinned by a cross-cutting theme of CWB and recognises that taking this
approach to regional economic development is essential to deliver a wellbeing
economy for future generations.  There are actions aligned to the AGD CWB
programme within the RES, including a commitment to considering a
mainstreaming approach to delivering CWB-focused enterprise support.  A one
6

Page 7

year extension to the programme would allow for this to be fully considered as part
of a wider review of regional economic development. 
11. Furthermore, the Scottish Government is fully supportive of the extension proposal,
having identified that there are no financial implications for the AGD with the ability
for funding to be drawn down from other sources, as set out in the review. 
Confirmation of this support was received on 18 December 2023.   
PROPOSALS 
12. That the Ayrshire Economic Joint Committee: 
(ii) Approves the project change request proposal to extend the programme by
one year, noting that the proposal has been supported by the Scottish
Government.   
FINANCIAL IMPLICATIONS 
13. As set out in the summary mid-term review, each local authority has aligned
funding from other programmes to allow for extended delivery of the programme
by extending staff contracts.  By extending the programme by one year, this will
allow for the programme underspend to support these posts in addition to allowing
all authorities to maximise spend under the business grant programme.  This will
have financial implications for North Ayrshire Council in terms of extending the
period of time required for lead authority management of the programme and the
costs associated with this. 
HUMAN RESOURCE IMPLICATIONS 
14. Each local authority has already aligned alternative external funding sources to
extend the contracts of the Business Locality Officers.  A one-year extension of the
programme would allow for the extension of contracts for the Programme Manager
and FWA Delivery Officer posts to be full covered trough the AGD CWB
underspend.  The Fair Work Ayrshire Programme Manager has already been
aligned to the Ayrshire Skills Investment Fund programme with that funding
supporting the continuation of that post.   
LEGAL IMPLICATIONS 
15. There are no legal implications.   
EQUALITY IMPACT ASSESSMENT 
16. The original Full Business Case was subject to an Equality Impact Assessment
which remains relevant.  
7

Page 8

CONCLUSION 
17. The AGD CWB programme has been successful in raising awareness of a CWB
approach to enterprises across the region.  It has taken a regional approach to
economic development and has been showcased as an example of best practice
in this regard by the Scottish Government.  A one year extension would allow the
outputs and outcomes to be fully achieved and for the business grant funding to be
fully disbursed.  It would also align with proposals in the Ayrshire Regional
Economic Strategy to consider a mainstreaming approach post March 2025 which
would contribute towards achieving a wellbeing economy for Ayrshire. 
Persons to contact: Emma McMullen (Senior Manager, Economic Policy,
North Ayrshire Council) 
Tel: 07956 461806 
Email: emmamcmullen@north-ayrshire.gov.uk 
Louise Kirk (Interim Head of Service Economic
Development and Regeneration) 
Tel: 01294 324766 
Email: lkirk@north-ayrshire.gov.uk 
8

Page 9

Ayrshire Growth Deal
Community Wealth Building
Programme Review
Report
A summary of programme development, progress and next steps
October 2023
9

Page 10

PROGRAMME AIM:
The Programme review:
This report details the impact of the Ayrshire Growth Deal (AGD)
Community Wealth Building (CWB) Programme to date, and provides
analysis and insight from key delivery stakeholders and Fund beneficiaries
to underpin decisions to be made regarding the programme’s 
underspend utilisation.
Key areas of purpose for the programme review report are as follows:
Improve project outcomes: The review of the programme allows
stakeholders to consider opportunities for improvement. By examining
the project's performance, identifying areas of underperformance, the
programme can enhance outcomes and deliver better results for CWB
in the Ayrshire region.
1.
Maximise resource utilisation: Allocating underspend for best value for
money ensures that project resources are utilised optimally. By
reviewing the project and identifying areas where funds can be
redirected, the programme can avoid wastage and make the most
efficient use of available resources.
2.
Adapt to changing circumstances: Programme requirements and
priorities have been subject to change; the review will detail this with
specific reference to both internal and external factors.
3.
Enhance stakeholder satisfaction: By reviewing the programme, the
team can ensure that stakeholders’ CWB needs are being met and
that they have benefitted as originally intended. This, in turn, can
contribute a continued raised profile of CWB in the region and to wider
transformational change.
4.
Additionality: The review will identify potential areas where existing and
additional funds could lead to further progression of CWB in Ayrshire.
5.
‘To develop an Ayrshire
approach to Community
Wealth Building that
enhances wealth, ensures
fair and meaningful work,
and creates successful
places throughout the
region.’
10

Page 11

Programme Overview:
The AGD CWB Programme seeks to develop resilient, inclusive
local economies, with more local employment and a large and
more diverse business base. Specifically, this project advances
activities within the procurement, employment, ownership and
asset pillars of CWB.
The project has three key elements to achieve this:
CWB Business Locality Officers – working with local
organisations to facilitate CWB activities across the region;
CWB Fund – a fund to support place-based CWB activity, and
the work of CWB locality officers;
Fair Work Ayrshire - a dedicated service that works with
employers to implement Fair Work in workplaces across the
Ayrshire region.
Timescales:
The programme was agreed to take place across three years,
from March 2021-2024.
Budget
The total value of the project is £3million, with spending allocated
as below. The full £3million is from Scottish Government.
CWB Officers
45.5%
CWB Support Fund
33.3%
Fair Work Ayrshire
14.6%
Programme Management
6%
Governance:
The project is managed by North Ayrshire Council as lead authority,
with overarching governance by a AGD CWB Programme Steering
Group comprising the three Ayrshire local authorities.
The project aligns with local authority existing resource, including
business development teams, employability programmes,
regeneration activities, community development and locality/area
partnerships, as well as Enterprise Agency resource with Scottish
Enterprise, Cooperative Development Scotland and Skills
Development Scotland.
The Regional Economic Partnership (REP) and the Ayrshire CWB
Commission receive regular project updates, outlining project
highlights, performance and opportunities for wider collaboration.
The programme’s organisational structure can be seen below, the
roles that are coded in purple are funded through the Ayrshire
Growth Deal:
NAC
Fair Work
Programme
Manager EAC SAC
Fair Work
Officers x 2
CWB
Officers x 3
CWB
Officers x 3
Lead Manager
NAC Senior Manager (Economic
Policy) Programme Lead
AGD CWB
Programme
Manager
CWB
Officers x 3
Lead & Team
Manager
NAC Senior Manager
(Employability)
Ayrshire organisations embedding CWB pillars through financial and advisory support
Ayrshire
REP & EJC
Ayrshire CWB
Commission
Management/Chief
Executives Group
Ayrshire Growth
Deal PMO
Key Delivery Bodies 
(e.g. SDS, SE)
Lead Manager
Team Manager Team Manager
Summary of the programme:
11

Page 12

This logo was evolved
from the original North
Ayrshire CWB branding.
It takes colours
representing the three
Ayrshires to show the
united approach to
economic development
Why Community Wealth Building?
Community Wealth Building
Community Wealth Building (CWB) is an economic development
approach that seeks to create sustainable and inclusive local
economies. It aims to build wealth and improve well-being within a
community by prioritising local ownership, cooperation, and social
value over traditional economic models focused solely on
maximising financial returns.
CWB for Ayrshire
The case for the Ayrshire region to benefit from a dedicated CWB
programme was supported by an analysis conducted by the
Scottish Government for the Advisory Group on Economic Recovery
and the Inclusive Growth Diagnostic. Key reasons include:
Addressing Economic Challenges and Vulnerabilities:
The Inclusive Growth Diagnostic highlighted specific economic
challenges faced by the Ayrshire region, such as low productivity,
unemployment, disparities in income and wealth distribution.
The analysis identified vulnerabilities in the Ayrshire region's economy
and showed that North Ayrshire and East Ayrshire have the least
resilient economies in Scotland, with South Ayrshire below the
Scottish average.  The programme was developed to help diversify
the economy, foster fair work practices, create new opportunities,
and build resilience to external shocks. By focusing on local assets,
capabilities, and collaboration, the programme is supporting
enterprises in the region to develop a more resilient and sustainable
economic foundation.
Leveraging Local Resources:
Key stakeholders realise the potential of untapped local
resources and sectors across Ayrshire that can be harnessed for
economic prosperity. Key outputs assigned to the programme
such as supporting new enterprises, and broader land and asset
& procurement related activities enable exploration of this.
CWB emphasises local ownership and cooperation, allowing
the Ayrshire region to leverage its unique assets and strengths.
By promoting local entrepreneurship, innovation, and
investment, the programme is helping the region unlock its
potential for inclusive and sustainable economic development.
Inclusive Growth:
The programme realises the importance of inclusive growth,
where economic prosperity is shared by all members of society.
Practically, the programme deliveries on this objective by
prioritising plural ownership transitions, fair work practices,
reducing inequalities, and fostering social inclusion. The
programme works with enterprises and key stakeholders
towards an economy that benefits everyone and ensures that
no one is left behind.
BTS FACT:
12

Page 13

Current Status:
The programme is performing well against targets set in
the Full Business Case and in some cases, exceeding key
outputs assigned.
This has not been without challenges especially in early
stages of delivery which will be detailed in the review;
however, the programme can see that real momentum
and confidence has been gained, underpinning
recommendations within the review for CWB work to
continue beyond the 3-year time-frame in order to
continue strengthening Ayrshire’s local economic
realisation.
In the recent round up of progress, pan-Ayrshire outputs
show that over 900 enterprises have been supported by
the programme in CWB. Based on an assured start and
progression through Year 3 of the programme, it is likely
that this headline target will be exceeded by some
distance.
956
unique enterprises
supported through the
programme
245
Enterprises receiving
financial assistance
through grant or
consultancy support
136
New enterprises
supported
(<12 months old)
233
Enterprises registered
on Public Contract
Scotland
387
Enterprises attending
CWB pillar specific
workshops
222
Businesses supported
by Fair Work Ayrshire
with Fair Work Action
Plans
22
Entities supported in
the creation or
transition  to
employee ownership
or Co-Operatives
1,027
Jobs safeguarded
through CWB
interventions and
support
262
Enterprises receiving
121 procurement or
consultancy support
3
large, pan-Ayrshire
CWB events featuring
industry leaders, public
sector executives and
economic expertsHeadline
achievements
to date:
1,035
local people
attending
Fair Work Job Fairs in
partnership with DYW
4
videos produced to
raise awareness
around the issues
tackled through CWB
13

Page 14

June 2021
Programme sign off and governance finalised
Recruitment commenced
Processes begin to be put in place
Aug 2021
CWB officers recruited in each Ayrshire local
authority
Fair Work Programme Manager recruited
60% of programme team in place
Commencement of enterprise support activity
Nov 2021
Programme Manager recruited
Monthly Programme Steering Group
meetings commence
Jan 2021
Mar 2022
June 2022
Official programme launch | pan-Ayrshire CWB video
produced and screened
123 attendees
Aug 2022
Fair Work Ayrshire Referrals commence
Pan-Ayrshire monthly officer meetings start
Scottish Government (SG) Ministerial visit from Tom Arthur MSP
Programme presentation to Scottish Government Director of
Economy Louise McDonald
Programme presentation at SURF’s Annual Conference
Final, successful recruitment push for a complete
programme team to be in place for the new financial
year
Timeline highlights:
14

Page 15

Oct 2022
Over 500 enterprises supported by the CWB programme
(achieved 6 months ahead of target)
Programme Manager supported Scotland’s First
Community Wealth Building Conference hosted by North
Ayrshire Council | Economic Policy Team
Produced the “A day in the life of a young person in North
Ayrshire” video
Financial assistance provided to 100 enterprises through
the £1m business fund
Mar 2023
April 2023
Sept 2023
Oct 2023
East Ayrshire CWB video produced
North Ayrshire Fair Work Job Fair - 420 attendees
pan-Ayrshire CWB Gathering hosted in East Ayrshire
South Ayrshire Fair Work Job Fair - 230 attendees
Programme surveys, review & options appraisal
development
The programme extended its benefits realisation to include
jobs and leveraged finance - over 1000 jobs safeguarded,
and £700k private investment leveraged
Timeline highlights:
Pan-Ayrshire Gathering hosted in South Ayrshire
South Ayrshire CWB video production
East Ayrshire Meet the Buyer event - 160 attendees
East Ayrshire Fair Work Job Fair - 380 attendees
Ayrshire Chamber Awards – first ever CWB Category
Headline target of supporting 900 unique enterprises surpassed
Protocols for programme extension to 2025 underway
160
attendees
135
attendees
15

Page 16

Events Impact Overview:
This year has seen the programme host two pan-Ayrshire CWB
Gathering events, the first held in East Ayrshire in March, and the
second most recently held in South Ayrshire at the end of September.
The purpose of these events are to build on the momentum from the
previous year with the official programme launch event, and
Scotland’s first CWB Conference hosted by North Ayrshire Council.
Each event has added gravitas to the progression of the programme
as well as showing the unique takes on the development of CWB
within each Local Authority area across the Ayrshire region.
A number of benefits have been realised through the events, such as
a majority increase in attendees knowledge and commitment to
CWB, and more tangible outputs such as collaboration opportunities
through networking, raised engagement with the opportunities of
procurement and land and assets pillars for example.
The most recent event in South Ayrshire welcomed over 160  key
stakeholders that held a great balance across public, private and
third sectors as well as across the Ayrshire region.
With 60 responses to the feedback survey, what people appreciated
most about the event was the quality of speakers and the networking
opportunities that were enabled:
The event included speakers from three Ayrshire businesses,
sharing their CWB journeys and the support they have received
through the programme. The event held dedicated
presentations on procurement and land and assets pillars, as
well as a forward thinking discussion around Artificial Intelligence
and how it intersects with CWB. A round up from Scottish
Enterprise representative Brian Connolly, gives good insight into
the day: here.
Survey responses further indicate that the event generated a
variety of opportunities in strengthening relationships, exploring
support offered, gaining insights into different projects and
initiatives, and identifying future opportunities and partnerships.
The programme’s
pan-Ayrshire
events have
received a high
level of interest
from key
stakeholders
across Ayrshire
16

Page 17

Events Impact Overview:
Feedback further reveals that people were inspired to think more
collaboratively across sectors, while some attendees express a greater
interest in AI and a desire to explore its applications further, potentially
in their own work. Others aim to engage more with the local
community and Ayrshire councils, and to support and promote the
Ayrshire economy. The event has encouraged attendees to become
more involved in various initiatives, such as local procurement,
consortium cooperatives and asset transfers, and to consider the
culture and values of their organisations in alignment with CWB
principles.
Overall, the event motivated individuals to take action in different
ways, from learning about new topics relating to CWB which will help
improve work practices and further economic realisation in Ayrshire.
Attendees vote ‘best
practice CWB presentations’
as most desired for future
programme engagements. 
Vanessa Good of the Good Travel Company
presenting on her CWB approach in business
and the coordination of Ayr’s first consortium co-
operative
Key stakeholders engaging with Ayrshire’s first CWB Marketplace
17

Page 18

Challenges & Solutions
The programme experienced key headline challenges
which will be summarised in the next pages of the
review, alongside some of the solutions exercised.
18

Page 19

Challenge: More broadly in wider Ayrshire when the
programme commenced in 2021, the concept of CWB was
somewhat unfamiliar. From the offset, the programme
understood that lack of understanding and awareness about
the principles and benefits of Community Wealth Building would
hinder its adoption. Therefore, education and outreach efforts
have been at the forefront of programme delivery, ensuring
that local stakeholders understand the value of CWB.
Solution: The programme overcame CWB education and
awareness challenges through several approaches:
‘Boots on the Ground’ - daily officer engagement with local
stakeholders, predominantly recipients of programme
support
Workshops and event engagement
An Ayrshire CWB video series - shared below
Other online resources such as press releases, and in some
cases, businesses and partner organisation themselves
creating blog articles with some examples of this listed
below:
Utopia Computers: CWB Story | Craig Hume - Director
CWB: Building Sustainable & Inclusive Economies in
Ayrshire | Martin Avila - Chief Executive CEIS
North Ayrshire
Education and Awareness
Challenge: Translating the theory of Community Wealth Building to
practice within the local region has been a complex challenge.
Community is at the heart of CWB, but often stakeholders have
mistaken the community oriented terminology to mean
community/third sector exclusive development instead of all-
encompassing economic development.
Solution: Officers were able to address this through explanations as
well as using local wealth building as an alternative term which
many stakeholders found easier to understand. Discussions and
training amongst officers enabled consistency in understanding and
articulation.
Challenge: CWB is a transferrable economic development tool but
any approach is relative to the subject/context/circumstances that
it is being applied to.
Solution: Where the programme officers have been able to bring
great value is through using their knowledge, experience, skills and
tools to tailor  the meaning of CWB to individual enterprises and
local contexts.  Often this has taken shape in the form of action
plans or support in developing applications for funding.
pan-Ayrshire East Ayrshire South AyrshireTo help improve
understanding of CWB
and the programme,
the team produced a
short video series:
19

Page 20

Resource Limitations
Broadly speaking, crises have forced many economic stakeholders,
particularly SMEs, to be reactive instead of proactive, hindering this
key approach required for successful community wealth building. The
cost crisis, especially in regards to energy costs for businesses is a
crucial challenge and the project is limited in the resource that it can
offer. In some cases, the programme officers rely on third parties to
support, and as the need for energy interventions heighten, third
party capacity to meet demand has decreased.
Rising costs have also had an impact on Fair Work uptake, where
employers have limited resource to invest in their workforce, such as
paying the Real Living Wage (RLW) or enabling staff training
opportunities.
Community Wealth Building often involves long-term strategies that
may not show immediate economic benefits. Communities may face
pressure to prioritise short-term gains, making it challenging to stay
committed to the CWB approach.
Done properly, CWB requires significant resource to deliver as an all-
encompassing approach with long-term gain for local economies
and communities. It is time intensive to connect the daily activity of
the programme to wider strategies and it makes the case for
upcoming potential CWB legislation to come with adequate
resource.
Ayrshire has well-documented economic challenges, and with that,
often local communities and enterprises have limited resources to
invest in the necessary infrastructure and initiatives required for
Community Wealth Building. This is where the CWB Business Support
fund is valuable in building capacity and implementing new
strategies.
CWB management leads were asked if they felt that there has
been enough resource to deliver key CWB outputs for the
programme. All agreed or were neutral on information, materials
and capital funding being sufficient. The majority agreed people
resource was sufficient with one lead in disagreement, but
predominantly, stakeholders highlighted that time resource had
been lacking:
In qualitative feedback, the key theme running through 
comments reiterated the need for extended or longer
programme durations. Respondents believe that the current
project timelines are insufficient to achieve the desired outcomes
effectively, arguing for more time and resources to be allocated
in order to engage a wider audience, sustain the activities,
oversee the programme more effectively, and allow for
substantial changes to be implemented by enterprises.
“To fully realise the benefits in relation to
leverage and fuller economic development
benefits the programme would have
benefited from being longer.”
AGD CWB Programme Steering Group Representative
20

Page 21

Staffing
Recruitment has affected budgets and consistency of
programme delivery significantly. Especially in the first year of
programme as things were set up and developed without the
Programme Manager in post. Suitable candidates for the CWB
officer posts were difficult to attract. One solution used to
overcome this challenge was to rename the officer posts as it
was realised the term Community Wealth Building Locality
Officer required explanation and therefore was a potential
barrier. This solution was effective.
The temporary nature of the roles has seen officers leave to take
up permanent employment, and others mentioning need for
more security amid cost of living and other challenges. It is likely
that further departures are imminent as the programme has
entered its final set year of delivery. It is unlikely that the space
will be filled in the timeframe remaining in programme funding
period, affecting targets met and general financial
management. The options appraisal informed by the review
seeks to address these issues.
Pan Ayrshire Approach
There is great strength in the pan-Ayrshire approach to CWB, but
there are also challenges due to each local authority being at
different stages, and having unique and differing issues to
tackle. This has been an ongoing aspect to monitor and
manage and a clear solution is yet to be determined. This has
been especially stark in the distribution of the CWB Fund. The
criteria agreed in early stages by the steering group has allowed
each LA to adapt and this has meant that differences. For
example, one authority initially had a £5k cap on grants and
mandatory match funding, whilst another has operated without
any of these restrictions.
Internal & External Alignment
As this is a new economic approach for the Ayrshire region that
requires collaboration from key economic influencers and
practitioners, the programme officers have had to take time to build
trust and relationships with council services and wider anchor
organisations, and this could have perhaps been initially
underestimated. This is an ongoing process, and more is being done
to strengthen inter-service connections as well as work with anchor
institutions specifically in areas such as local procurement.
Strategically, there is opportunity for the programme to join up
activity more prominently with regional anchor CWB interventions as
well as in anticipation of wider AGD capital projects. This has
happened naturally in areas of procurement, but more could be
done to maximise resource and impact from the programme at all
levels.
The local and national initiatives, frameworks, policies, economic
models and overall efforts to tackle the economic, social and
environmental challenges faced across Ayrshire and Scotland are
countless.
With many approaches and programmes in delivery, there is the risk
of duplication of efforts, misalignment, and a disjointed outcome. As
the programme works with key stakeholders, it seeks to enhance, not
duplicate, existing council service delivery, and on a wider scale,
seeks to collaborate rather than compete, wherever possible.
This alignment strengthens the gravitas of measures set to tackle
shared crises and challenges, bringing Ayrshire closer to local
resilience, wealth and prosperity. Alignment with key partners under
the pillars of CWB can be seen on the following page:21

Page 22

Strategic Partners
Procurement Fair Work Land and Assets Plural Ownership Financial Power
National
Regional
CW
B
22

Page 23

Internal
Stakeholder
Analyses
The programme has engaged with key internal stakeholders to enable
insight into the programme and shape plans going forward. PESTEL
and SWOT analyses were applied to enable thorough understanding
23

Page 24

PESTEL Analysis
Relating to the macro impacts mentioned previously,
management stakeholders were asked to grade PESTEL impacts,
as detailed below, to explore how external factors have
impacted the programme's progression.
The results can be seen in the graph below:
1.Economic and Financial Challenges: The cost of living is mentioned
as a significant hurdle for enterprises, making it difficult to increase
wages and sustain operations. Rising overheads and the need to
compete for staff with attractive pay and benefits are cited as
factors that hinder financial viability. However, the cost-of-living crisis
is seen as a catalyst for enterprises to consider different approaches
and strategies to navigate the challenging economic environment.
This recognition has led to an increased uptake of support services.
An example of where the programme has responded to the financial
challenges in business is where flexibility was enabled with match
funding, and as a result, far more businesses have been able to
benefit from the fund.
2.Political Perception and Pragmatism: There is a mention of the
change in leadership administration impacting the perception and
structure of the CWB programme, with initial associations to specific
political agendas. The comment suggests the need to emphasise the
pragmatic aspects of CWB that can transcend political ideologies.
3.Limited Collaboration: The comment highlights the challenges
arising from collaboration among three different local authorities at
varying stages of understanding. Limited collaboration is seen as a
hindrance to achieving optimal CWB outcomes for the region.
4. Interplay between Political Changes and Cost of Living: Another
comment suggests that political changes, followed closely by the
cost-of-living challenges, have created a complex landscape for
businesses. These external factors are likely intertwined and can
impact business operations and decision-making.
four key qualitative themes:
“Cost of living makes it difficult to
encourage business to increase wages
when overheads are increasing, also some
businesses just have to cease due to cost.
Availability of staff is low so then employers
have to be more competitive with pay and
benefits and leads to struggle to operate in
a financially viable way.
- AGD CWB Steering Group Representative
24

Page 25

SWOT Analyses
Both management and delivery officers took time to analyse
strengths, weaknesses, opportunities and threats in regards to the
programme. The delivery officers undertook the analysis in Aug ’22
but many observations are still relevant at the time of writing. The
management team shared insights more recently (May ‘23) for a
more updated take on the programme’s status.
CWB team management leads were asked to highlight any strengths
and weaknesses which took shape in comments revolving around
staff and programme management, as well as the need for
relatability and inclusivity. These can be broken down into four key
points:
Promotion and Empowerment: The successful promotion of Ayrshire
and the desire for everyone to feel empowered and have a stake in
the future of the region was highlighted in the comments. This
emphasised the importance of making initiatives relatable and
inclusive for residents of all ages and backgrounds.
Challenges in Programme Management: One comment mentioned
challenges faced by the NAC in mainstreaming CWB with specific
challenges including difficulty in reporting, multiple requests for
information, and a lack of synergy between the three local authority
approaches.
Strength of the Staff: Another comment identified the staff as the
internal strength of the programme. It acknowledged leadership,
enthusiasm from the Programme Manager, alongside commitment
demonstrated by the Locality Officers, which has contributed to the
programme's success. The additional value brought by the FWA staff
team is also mentioned.
Weakness of Programme Length: Comments reiterated the
weakness related to the programme's length. There is concern
that the lack of succession funding may lead to the possibility of
losing staff, highlighting the importance of securing adequate
funding to sustain the programme and its positive impacts for
CWB across the region.
“The internal strength of the programme is
the staff. There is excellent leadership and
enthusiasm from the Programme Manager
and the commitment demonstrated by the
Locality Officers has made the programme
a widespread success. Having the
additional FWA staff team has also added
significant value to the programme.”
AGD CWB Programme Steering Group Representative
Programme Delivery Officer SWOT Analysis:
25

Page 26

CWB Enterprise Feedback
The programme manager has worked with the CWB leads
and delivery team to survey programme support recipients.
The summaries below are gathered from surveys completed
by 125 enterprises feedback across the three local authorities.
26

Page 27

General Feedback:
Overall, the financial assistance and consultancy support provided
by the CWB Fund have had a significant positive impact on
enterprises. It has facilitated business growth, job creation,
streamlined processes, strategic planning, skill development, and
sustainability, ultimately leading to increased turnover, improved
productivity, and expanded opportunities.
6 key benefits to enterprises
receiving financial assistance or
consultancy support from the
CWB Fund:
1.Increased Business Opportunities:
Financial support enabled enterprises to upgrade their websites,
advertise vacancies, and improve online presence. This led to an
increase in companies contacting them for services and a higher
number of candidates seeking job placements, ultimately boosting
business growth and job creation.
2.Expansion and Growth:
Enterprises received grants for equipment purchases, premises
relocation, and marketing strategies, enabling them to expand
their operations, sustain growth, and hire additional staff. The
support facilitated skills development, improved project
management, and enhanced the overall offering to clients,
contributing to business sustainability and competitiveness.
3.Environmental Sustainability:
Financial assistance helped businesses reduce their carbon
footprint and utility usage through energy-efficient upgrades,
such as LED lighting, insulated doors, and equipment for recycling
and using recycled materials. This aligns with wider sustainability
goals and net zero ambitions.
4.Increased Productivity and Efficiency:
Investments in digital workflows, updated laptops, and storage
systems allowed for remote work, flexibility, and improved
productivity. Streamlined processes, secure file storage, and
sharing systems facilitated collaboration and enhanced overall
operational efficiency.
5.Enhanced Marketing and Visibility:
Financial support enabled enterprises to revamp their business
identities, improve marketing strategies, and enhance online
presence through social media and website development. This
raised awareness of their products and services, attracted new
customers, and contributed to job security.
6.Cost Savings and Financial Stability:
Support for energy efficiency measures, lower utility bills, and
reduced operating costs allowed businesses to reinvest the saved
funds into company growth, innovation, and development.
Financial stability is enhanced, allowing businesses to navigate
economic challenges.
27

Page 28

The CWB Pillars
The headline achievements highlight specific support
associated with the pillars of CWB. This next section will
give examples and insight to progress that has been
made through the programme
28

Page 29

CWB Pillar Focus
The pillar focus is largely what sets the programme apart from other
business support services within local authorities.
Responses to the question: ‘Community Wealth Building has
enabled a more focussed and enhanced approach to
business/organisational support from my Local Authority’, can be
seen below:
The survey responses above show that the majority agree that CWB
has enabled a more focussed and enhanced approach to
business support from Local Authorities. Further information
provided by enterprises on the above question follow five themes:
1.Knowledge, advice and enthusiasm:
The survey responses above show that the majority agree that CWB
has enabled a more focussed and enhanced approach to
business support from Local Authorities.
2.Networking & Introductions:
Many respondents mentioned the importance of officers
connecting them with relevant individuals, organisations, and
teams. Introductions to other businesses, funding organisations, and
local authorities were seen as valuable support in establishing
partnerships, accessing resources, and expanding their networks.
3.Grant support and equipment upgrade:
The provision of grants for equipment upgrades was appreciated
by the respondents. This financial assistance enabled them to
improve their operations and efficiency. Several respondents
mentioned the support provided by specific officers who have
gone above and beyond expectations, in helping them secure
funding for their businesses or projects. This support was highly
appreciated and considered instrumental in their success.
4.Support for community initiatives: 
Officers were commended for their involvement in community
initiatives and projects. Their enthusiasm, single- mindedness, and
dedication in supporting and promoting local businesses and
organisations were highly valued.
5.Practical assistance and problem-solving:
Officers were praised for their hands-on support, such as helping
with the application process, providing practical suggestions,
and going above and beyond to find local suppliers or
alternative solutions to meet specific needs.
Overall, the respondents valued the tangible and intangible
support provided by the officers, including funding assistance,
knowledge sharing, networking opportunities, and practical
problem-solving.
“Had heard of NAC CWB programme generally but this enables me to see
the practical benefits as relevant to my business. As a result of this I have
been highlighted by the "Made in Scotland" programme and at the last
Trade Fair secured an export contract and expanded my stockists across
Scotland. The grant programme has been crucial to these developments.”
RCO Furniture29

Page 30

Procurement
233
Enterprises registered
on Public Contract
Scotland
387
Enterprises attending
CWB pillar specific
workshops
262
Enterprises receiving
121 procurement or
consultancy support
The programme has found that procurement is a catalyst for other CWB
pillar delivery.  Key outputs shared above, focus support on raising
organisations chances of success with public contract tenders. This
could be delivered through workshops, sometimes delivered through
partner organisations such as the Supplier Development Programme, or
121 or consultancy support.
Survey feedback highlights difficulties local enterprises face within
procurement. For those seeking to win contracts with anchor institutions
such as local authorities, the NHS, Police Scotland and higher
educational institutions, tender experience stands as the biggest
barrier, followed by time, capacity and confidence. The programme is
focussed on supporting local organisations in tackling this barriers.
The procurement pillar of Community Wealth Building centers on
intentionally directing institutional and governmental purchasing power
toward supporting local economies, small businesses, and sustainable
practices to foster community development and economic equity.
There are three key output areas for the programme that relate directly
to procurement:
For organisations looking to source and procure locally, cost,
options and availability are suggested to be the most
significant prohibitors.  Additionally, there is a need for better
information access and comparisons, as well as more
consideration for other criteria that can improve the
changes of sustainable local procurement in funding
applications.
The programme addresses these issues through events that
engage these enterprises with wider strategies and initiatives,
as well as alignment with the work of the Ayrshire CWB
Commission, the Ayrshire Regional Economic Strategy and
wider Ayrshire Growth Deal programmes which have more
strategic influence on positive progress in these areas. This
partnership working underpins the promising insights that see
an increase in local spend in each of the three Ayrshire local
authorities:
North Ayrshire East Ayrshire
South Ayrshire
SAC lead on the pan-Ayrshire
procurement workstream as
part of the CWB Commission,
supporting delivery through
innovative mapping tools
showcased in this presentation
by David Alexander of SAC.
30

Page 31

Land and Assets
No key outputs were  assigned in programme when
terms were agreed but progress has been achieved.
The land and asset pillar of Community Wealth Building involves
leveraging publicly owned land and assets to generate local
benefits. A large proportion of focus within the land and assets pillar
has been directed towards net zero ambitions that public, private
and third sectors are required to play a role in. By guiding
businesses to embrace this pillar, the programme has been able to
support stakeholders to reclaim control over their built environment.
Encouraging enterprises to invest in locally owned land and assets
has helped cultivate a sense of ownership, stability, and
interconnectedness. Businesses have found that this pillar not only
prevents capital leakage but also ensures that resources circulate
within the community, amplifying the positive impacts.
When businesses were asked what one thing they would change
about their business was, the answer was largely focussed on Land
and Assets, emphasising the need for continued support around
this pillar:
The programme has no direct outputs aligned to the pillar but
has successfully been able to help organisations relocate,
expand and and improve their premises.
Community Asset Transfers have also formed a theme within
programme support, specifically in South Ayrshire where the
programme has supported the likes of Dundonald Castle, and
other fantastic organisations to own land and assets through a
transfer from the local authority. The video below gives an
example of this support with the feature of Dr Kirsteen Croll of
Dundonald Castle:
“We want to bring people together to give them a sense of
ownership, of their castle and a pride in their heritage and we
couldn't have done it without the support of the Community
Wealth Building team at South Ayrshire Council.”
Dr Kirsteen Croll, Dundonald Castle
31

Page 32

Plural Ownership
136
New enterprises
supported
(<12 months old)
387
Enterprises attending
CWB pillar specific
workshops and 38
enterprises accessing
121 plural ownership
support
22
Entities supported in
the creation or
transition  to
employee ownership
or Co-Operative
The plural ownership pillar of Community Wealth Building focuses on
expanding community ownership models, such as cooperatives and
employee-owned businesses, to democratise wealth, empower local
communities, and create more equitable economic structures.
There are three key output areas for the programme that relate directly
to plural ownership:
The programme has supported a number of organisations to explore
and transition to employee ownership models, social enterprise and co-
operative models.  Though targets are being met, the plural ownership
pillar has been most challenging to deliver on thus far.  It is thought that
this is due to a lack of understanding and contextual relevance of
plural ownership to local organisations, as well as the culture,
willingness, motivation and circumstantial alignment needed to enable
the sometimes radical transitions. The programme has addressed these
challenges through awareness raising at events, case study examples,
online content development, 121 and consultancy support.
It is common for these interventions to come about in tandem with
owners succession planning, and many instances of support have
included partnership working with organisations such as Co-operative
Development Scotland of Scottish Enterprise.
Some plural ownership examples are still in development, for
example within the North Ayrshire CWB team is supporting a
business that has seen rapid growth trajectory and recently
purchased a competitor. One of the main directors has a
partner who is ill and they are looking to make sure business is
able to continue if director needs to stand back. This is where
the programme gave them ideas around plural ownership and
they are developing themselves as an Employee Ownership
Trust.
The programme has been able to support the creation of a
consortium cooperative built of business leaders occupying
New Market Street in Ayr. This consortium cooperative is called
New Market Street Traders. This is a result of CWB awareness and
support of the programme, paired with their vision is to
regenerate the town centre, have a collective approach to
procurement for shared benefits and more.
The programme’s CWB team in South Ayrshire is working
specifically with Vanessa, the director of The Good Travel
Company who is supporting the coordination with businesses
that occupy New Market Street. The programme has so far
supported with consultancy support and the cooperative is in
early stages of being operational. Vanessa gave inspiring insight
into NMST at The Ayrshire Gathering, held in Troon in Sept ‘23.
The programme is also focussed on supporting organisations
who have already made the shift to plural ownership, for
example. supporting Shuttle Busses in North Ayrshire with Fair
Work, and Microtech in East Ayrshire with decarbonisation
efforts, offering financial assistance with the upgrading of all
lighting systems to LED.
32

Page 33

Fair Work
1,035
local people
attending
Fair Work Job Fairs
hosted by FWA
245 136
222
Businesses supported
by Fair Work Ayrshire
with Fair Work Action
Plans
1,027
Jobs safeguarded
through CWB
interventions and
support
The Fair Work pillar of Community Wealth Building in Scotland prioritises
the implementation of equitable labour standards, encompassing fair
wages, inclusive employment practices, and workplace democracy, to
foster thriving and sustainable local economies.
In addition to the key outputs shared above, the dedicated Fair Work
Ayrshire Team have achieved the following since being fully operation
from April 2022:
Engaged with 236 businesses.
Conducted 174 initial meetings and developed 174 action plans.
Completed Fair Work Ayrshire action plans 119.
44 Ayrshire businesses have been referred to secure real living
wage for accreditation.
54 Ayrshire businesses have been referred to secure disability
confident accreditation.
43 referrals to Working for a Healthy Economy (AGD) SALUS
13 referrals for Carer Positive scheme Scotland (following
engagement with MSPs in Jan 23)
13 Ayrshire businesses have been signposted to create a Modern
Apprenticeship opportunities.
22 Ayrshire business have been signposted to learning &
development opportunities.
Key Highlights from Fair Work Ayrshire from April 2022 – March
2023 are:
Working strategically with CWB Fair Employment workstream
and supporting development of subgroup action plans.
Presented Fair Work and Fair Employment plans to Tom
Arthur MSP at Ministerial Visit on 31/08/22.
Presented to MSPs conducting Parliamentary Inquiry into
Parental Employment on 13/01/23.
Hosted visits for NAC Council Leader Marie Burns to Fair Work
employers in NAC on 27/1/23.
Attended Ayrshire College Equalities steering group with key
stakeholders across Ayrshire to address gender balance on
particular courses and sectors.
Delivered in partnership with Business Gateway a Fair Work
Workshop for employers.
Completed research and reviewed job vacancies and
online platforms to evaluate scope of current fair work job
opportunities.
Working in partnership with NAC HSCP to deliver Fair Work
Academy to care sector providers delivering 7 workshops to
enable them to embed fair work practices in their
workplaces (Jan 23 -May 23) 18 providers attending.
First NAC Fair Work Job Fair 21/03/23 in partnership with DWP
attended by 26 businesses and organisations and 425 job
seekers.
Working with Digital Renewal Manager shaping Digital
Economy Skills Group to identify gaps for employers and in
learning and the community.
These achievements are supporting the ambition to make
Ayrshire the first Fair Work region in Scotland.
33

Page 34

Forward Planning
The purpose of the review to: (1) enhance project outcomes;  (2) maximise
resource utilisation; (3) adapt to changing circumstances; (4) enhance
stakeholder satisfaction; (5) explore additionality. To activate the learnings
from the review, an options appraisal was carried out with the programme
steering group. This final section will give an overview of this.
34

Page 35

The programme continues momentum into an additional year to build on the
delivery of outcomes and success.
This option gives the best opportunity to tailor underspend of the programme
for best value for money, allowing to capitalise on areas of success such as
procurement support and fund distribution, with further additionality potential,
for example linkage to CWB themes within the wider Ayrshire Regional
Economic Strategy
Option 4 enables further time to overcome challenges described by internal
stakeholders in SWOT and PESTEL analyses
Possibility of additionality in roles to support CWB to be further embedded into
AGD capital projects
Options Appraisal
To activate the learnings from the review, an options appraisal was
carried out with the programme steering group. It took into
consideration the findings of research shared in this report, and sought
to find the best way forward of maximising the underspend and
continuing the positive work of the programme across Ayrshire. The
options considered were as follows:
Option 1: Extend the programme based on original FBC approved
budget profiles
Option 2: Extend programme by 6 months - Align all officer dates to
the end of September 2024
Option 3: Extend programme by 1 year - Align all officer dates to
the end of March 2025
Option 4: Extend the programme by 1 year and continue
specific/partial aspects of the funding beyond March 2024, based
on need and consideration of review
Option 5: Each Local Authority takes responsibility for the
continuation or discontinuation of CWB programme
Through careful consideration, Option 4 has been decided as the
preferred option. Budget and programme review considerations
underpinned this decision. The benefits of this option outlined below:
Therefore, the Programme Steering Group proposes that the
programme be extended by one year, utilising the
underspend accumulated through a delayed start as well as
additional funding allocated through Shared Prosperity and
other reserve funding to enable a full years extension.
The programme’s underspend will be able to cover the
majority of the cost for an additional year of operation:
Through consideration of the review, the Programme
Steering Group has agreed that Option 4 is the preferred
way forward for the AGD CWB Programme. The Programme
Lead and Manager are working with the PMO to progress
through change management and other necessary
protocols to support the implementation of this option.
Options Appraisal Action:
35

Page 36

Conclusion
In conclusion, the AGD CWB Programme Review Report provides a comprehensive analysis of the current status of the programme and
associated benefits for stakeholders.
The review highlights the economic challenges faced by the Ayrshire region and ongoing challenges that have impacted the
programme. It is clear that the programme has made progress towards its milestones, but there are still challenges which aim to be
addressed through further collaboration, and the progression of Option 4 (extending the programme by 1 year) in the options appraisal
forming part of the review. Overall, the AGD CWB Programme Review Report provides valuable insights into the programme's strengths,
weaknesses, and opportunities for improvement for key stakeholders to consider and progress.
We would like to extend our gratitude to the Scottish Government for their pivotal role as funders of the Ayrshire Growth Deal
Community Wealth Building Programme. The guidance and oversight from the Ayrshire Growth Deal PMO have been greatly
appreciated, offering support and direction especially as the programme looks forward to extension and mainstreaming possibilities.
Thank you to the dedication of Elected Members and key officers in each Ayrshire local authority, whose diligent efforts and
commitment have been integral to the effective implementation and delivery of this programme to date.
Most importantly, thanks to the enterprise leaders and residents of Ayrshire whose active engagement have supported the
advancement of Community Wealth Building across our region.
As we reflect on the achievements thus far, we recognise the significant potential for so much more to be achieved through
Community Wealth Building and we hope that this review can support a continuation of this ambition.
Thank you
36

Page 37

AYRSHIRE ECONOMIC JOINT COMMITTEE       
Meeting – 15th January 2024
REPORT BY THE CHIEF EXECUTIVE, NORTH AYRSHIRE COUNCIL
SUBJECT: AYRSHIRE REGIONAL REVENUE PROJECT 
AYRSHIRE SKILLS INVESTMENT FUND
PURPOSE OF REPORT
1. This report seeks approval of the detailed governance arrangements for the
Ayrshire Skills and Investment (ASIF) sub-committee of the Ayrshire
Economic Joint Committee(AEJC) including the Terms of Reference and
Standing Orders.
RECOMMENDATIONS
2. The Joint Committee is asked to:
i. Consider and approve the Terms of Reference for the Ayrshire
Economic Joint Committee Ayrshire Skills Investment Fund Sub
Committee.
ii. Note that the agreed governance arrangements have been
implemented, creating the AEJC, Ayrshire Skills and Investment Sub-
Committee, with delegated authority to award the fund.
iii. Ratify the appointment of Councillor Marie Burns as Chair and appoint
a Vice Chair to the Ayrshire Skills and Investment Fund sub-committee
(ASIF sub-committee)
iv. Note the grant funding approved at the meeting of the ASIF sub-
committee on  November 2023 as detailed in Appendix 3 in
accordance with the general delegation granted by the AEJC on 20
June 2022 and ratify the delegation for approval of grant funding
awarded.
v. Agree that an update is provided every 6 months on funding awards
and achievements.
BACKGROUND
3. The Ayrshire Skills Investment Fund (ASIF) has secured £3.5 million to deliver
a range of skills interventions to address skills gaps across the region and
equip people with the skills to compete effectively in the labour market and
ensure people have the skills required for the future.
Agenda Item 3
37

Page 38

Since the ASIF committee is a subcommittee of the AEJC, this report has not
required to be considered by the AEPB. 
DESCRIPTION OF PROJECT 
4. The ASIF will provide a flexible and responsive skills fund for Ayrshire’s
businesses and residents.  The fund will be strategically aligned to the
Regional Skills Investment Plan (RSIP) and the Regional Economic Strategy
(RES) and will support inclusive growth and community wealth building
principles.  It is aimed at helping employers grow and develop their
employees and increase skills for Ayrshire residents, linking them to growth
sectors and employment opportunities, with the objectives of reducing
unemployment and increasing productivity.   The fund supports skills
development, where funding currently does not exist, closing funding gaps in
the skills system and contributing to the development of skills needed to
support regional, inclusive, economic growth. 
IMPLEMENTATION PLAN 
5. Following the decision of the AEJC on 20 June 2022, the AEJC Sub-Committee
was established in January 2023 with delegated authority to: 
• Consider the output of the Regional Skills Investment Plan and the Regional
Economic Strategy
• Identify and prioritise skills gaps on an ongoing basis.
• Determine and implement the most appropriate means of administering the
ASIF to meet identified skills gaps.
• Invite and evaluate ASIF Grant applications
• Award grants from the ASIF; and
• Develop and establish a suitable procurement process to ensure sufficient
training provision is secured to meet identified skills gaps. 
6. The Sub-committee has been operating to date based on the general
delegation granted by the AEJC on 20 June 2022 and on the draft Terms of
Reference and Standing Orders, presented to the AEJC for approval.    
7. The ASIF sub-committee includes representatives from:
North Ayrshire Council,  East Ayrshire Council, South Ayrshire Council,
Scottish Enterprise, Skills Development Scotland, Ayrshire Growth Deal PMO,
GMB, Unison and Unite Trade Unions with Ayrshire College and the
University of the West of Scotland participating in an advisory capacity where
appropriate. 
8. A grants programme will identify suitable training and an open procurement
framework will be established to create a flexible and responsive skills
programme. 
38

Page 39

GOVERNANCE 
8. The ASIF Sub Committee is formed in terms of section 56(1) of the Local
Government (Scotland) Act 1973, the draft Terms of Reference (ToR) are
included within Appendix 1 of this report. 
9. The ToR is aligned to the Standing Orders, included within Appendix 2 of this
report, which sets the framework for the conduct of  meetings. 
10. The Chair of the ASIF Sub Committee is Councillor Marie Burns, appointed by
the Ayrshire Economic Joint Committee, in accordance with the ToR and
Standing Orders.  A Vice Chair should also be appointed, from the elected
members already appointed to the sub-committee, who will chair the meetings
in the absence of the appointed chair.     
11. The Minutes of the meetings of the sub-committee held since its
establishment are included within Appendix 3 of this report. The grant funding
agreed by the sub-committee is detailed in the Minutes of the meeting of 20th
November 2023 and in relation to which ratification is sought from the AEJC
prior to formal offer of funding.       
LEGAL IMPLICATIONS 
12.  The ASIF project requires robust governance to ensure that its objectives are
achieved in accordance legal requirements. 
13. The governance has been developed in consultation with all 3 Ayrshire local
authorities who have all contributed to the development of the ToR and the
Standing Orders. 
HUMAN RESOURCES IMPLICATIONS  
14.  The Fair Work and Skills Ayrshire team are in place to deliver the fund,
supporting people and employers across the region ensuring the necessary
interventions are available to support the skills development needs for the
region. 
EQUALITY IMPACT ASSESSMENT 
15. An Equality Impact Assessment has been completed and has identified
generally positive impacts arising from the fund, due to its strategic purpose.
The fund was created to address inequality and improve socio-economic
outcomes for disadvantaged groups in Ayrshire.  The aim of this fund is to
develop skills and increase local training capacity to develop future skills to
achieve inclusive growth and increase productivity across the region delivering
a direct impact on social-economic outcomes.   
39

Page 40

CONSULTATIONS 
16. The project board through the Local Authority Employability and Business
Development leads have been consulted throughout development. 
17. This has been considered by the 3 Local Authority Legal teams and they agree
with the content of the ToR and the Standing Orders. 
Background Papers: 
Heads of Terms, signed by the UK Government and the Scottish Government
and Ayrshire’s Councils on 8 March 2019 
Deal Document, signed by both the UK Government and Scottish Government
and Ayrshire’s Councils on 19 November 2020 
Person to Contact:  Laura Neill (Senior Manager, Employability & Skills,
North Ayrshire Council) 
Tel: 01294 324802  
Email:  lauraneill@north-ayrshire.gov.uk 
Neale McIlvanney (Interim Head of Service 
Growth, Investment, Employability)  
Email: nealemcilvanney@north-ayrshire.gov.uk 
40

Page 41

Appendix 1
Ayrshire Economic Joint Committee 
Ayrshire Skills Investment Fund Sub Committee 
Terms of Reference
Draft V6
January 2024 
Introduction 
The Ayrshire Economic Joint Committee (“AEJC”) has established a sub-committee
with delegated authority to create, implement and approve awards from the Ayrshire
Skills Investment Fund (“ASIF”).   
The ASIF is an Ayrshire Growth Deal project designed to fund skills development
and training in priority sectors, when existing provision is not available, flexible or
responsive. 
Constitution
The ASIF Sub Committee is formed in terms of section 56(1) of the Local
Government (Scotland) Act 1973. It shall comprise a maximum of [22] members in
terms of its Standing Orders, being: 
(a) [three] representatives (one Councillor and two Officers) nominated by each
of North, East and South Ayrshire Councils.
(b) [one] representative nominated by each of Skills Development Scotland and
Scottish Enterprise; and
(c) [one] representative nominated by each of GMB Union, Unite Union and
Unison Union. 
The ASIF Sub Committee may also co-opt up to [three] additional members on the
basis of experience or skills, whether from existing members, from other
organisations or individuals. 
[Named substitutes are permitted to attend in place of any nominated member.] 
The ASIF Sub Committee may also appoint up to [three] advisors from the Higher or
Further Education sectors on the basis of experience or skills. 
Chair
The Chair and Vice Chair shall be appointed by the AEJC. 
Quorum
A quorum of the ASIF Sub Committee shall be six, with at least one nominee from
each of the Ayrshire Councils present. 
Standing Orders and Meetings
The Standing Orders of the ASIF Sub Committee shall be as detailed in the
Appendix. The ASIF Sub Committee shall meet every six weeks and the Chair may
convene additional meetings as required. 
41

Page 42

Delegated Powers
The ASIF Sub Committee has delegated powers to implement its functions, except
as otherwise provided herein. 
Functions Referred
The following functions of the AEJC will stand referred to the ASIF Sub Committee: 
1. To consider the output of the Regional Skills Investment Plan. 
2. To identify and prioritise skills gaps on an ongoing basis. 
3. To determine and implement the most appropriate means of administering the
ASIF to meet identified skills gaps. 
4. To invite and evaluate ASIF Grant applications, including conducting a
subsidy control assessment in respect of each application. 
5. To award grants from the ASIF; and 
6. To develop and establish a suitable procurement process to ensure sufficient
training provision is secured to meet identified skills gaps. 
42

Page 43

Appendix 2 
Ayrshire Economic Joint Committee 
Ayrshire Skills Investment Fund Sub Committee 
Standing Orders for the Conduct of Meetings
Draft V1
January 2024 
COMMENCEMENT 
These standing orders will apply and have effect from the date approved by the
Ayrshire Economic Joint Committee. 
DEFINITIONS 
In these Standing Orders the following words and expressions have the following
meaning as shown below:- 
“Constituent Authority” means any of the East, North or South Ayrshire Councils; and 
“ASIF Sub Committee” means the Ayrshire Skills Investment Fund sub-committee
formed under Sections 56 and 57 of the Local Government (Scotland) Act 1973 for the
purposes of regulating the shared discharge of the functions of the Constituent
Authorities. 
MEETING ARRANGEMENTS 
Dates of Meetings 
1. The ASIF Sub Committee shall meet at least every six weeks or more often as
is required to conduct its business, dates of meetings to be agreed by the ASIF
Sub Committee. 
2. A special meeting of the ASIF Sub Committee may be called at any time: 
(a) by the incumbent Chair; or 
(b) if at least one quarter of the total number of members request a meeting in
writing specifying the business to be transacted.  The requisition shall be
submitted to the Chief Executive of the incumbent Chair’s Council and shall
be included in the notice and summons of the meeting.  The Chief Executive
will determine the time and venue of the meeting, which shall be held within
14 days of the receipt by the Chief Executive of the requisition. 
Place, Time and Notice of Meetings 
43

Page 44

3.1 Except in the case of urgency (when the incumbent Chair may direct accordingly)
three clear days at least before a meeting of the ASIF Sub Committee. 
i. Notice of the time and place of the intended meeting shall be published by
the Chief Executive of the incumbent Chair’s Council or an appropriate
officer of that council, responsible for the administrative support of the ASIF
Sub-Committee, at that Council’s principal office and, where practical, at
the place where the meeting will be held if the meeting is to be held outwith
that Council’s principal office; and 
ii. A summons to attend the meeting, specifying the business to be transacted
shall be emailed to the last known email address, or left at or sent by post
to the usual place of residence, of every Member of the ASIF Sub
Committee as appropriate, or to such other address as the Member may
notify in writing to the Chief Executive of the incumbent Chair’s Council. 
LACK OF NOTICE 
4. Want of service of a summons on any Member of the ASIF Sub Committee shall
not affect the validity of any meeting. 
QUORUM 
5. The quorum for the ASIF Joint Committee shall be six, with at least one nominee
from each of the Constituent Authorities present. 
No business shall be transacted at any meeting of the ASIF Sub Committee
unless a quorum is present. 
If, 10 minutes after the time appointed for a meeting a quorum of Members is not
then present, the meeting shall stand adjourned and it shall be minuted that
“owing to the want of a quorum, no business was transacted”. 
CHAIR
6. The Chair of the ASIF Sub Committee shall be appointed by the Ayrshire
Economic Joint Committee.           
The Chair shall preside.  In the event of the incumbent Chair either being absent
or withdrawing from a meeting, the vice-Chair shall so preside or in their absence
another elected  member serving on the sub-committee as agreed by the sub-
committee members present shall assume the Chair for that meeting or part
thereof.   
POWERS AND DUTIES OF CHAIR 
7. Deference shall at all times be paid to the authority of the Chair.   When the Chair
indicates a wish to speak, any Member who may be addressing the meeting shall
give way.   The Chair shall:-
44

Page 45

(i) preserve order and ensure that every member of the ASIF Sub Committee
shall have a fair hearing. 
(ii) decide all matters of order, competency and relevancy and the ruling of the
Chair shall be final and shall not be open to discussion. 
(iii) decide between two or more members of the meeting indicating that they
wish to speak by calling on the member who has first caught the attention
of the Chair. 
(iv) ensure that due and sufficient opportunity is given to members who wish to
speak to express their views on the subject under discussion. 
(v) be entitled, in the event of disorder arising, to adjourn the meeting to a time
he or she may then, or afterwards, fix and his or her leaving the Chair shall
indicate the meeting is adjourned; and 
(vi) the Chair shall, at his or her discretion, determine all questions of procedure
for which no express provision is made under these Standing Orders with
regard to the regulation of the proceedings and business of the ASIF Sub
Committee meetings. 
BUSINESS AT MEETINGS 
8. At a meeting of the ASIF Sub Committee, no business other than that specified
in the summons shall be considered. 
URGENT BUSINESS 
9. Business which has not been specified in the summons may be considered
where the Chair determines that the matter is one of urgency.   It shall be at the
sole discretion of the Chair to decide whether any business not specified on the
agenda for the meeting, by reason of special circumstances, be considered at
the meeting as a matter of urgency, and such special circumstances must be
specified in the Minute of the meeting. 
ORDER OF BUSINESS 
10. The business at any meeting shall (unless as otherwise directed by the Chair
who may, at his or her discretion, alter the order of business at any stage)
proceed in the following order:- 
(i) the Sederunt shall be taken; the names of the members present at the
meeting shall be recorded with the Chair at the head followed by the
remaining Members. 
(ii) Minutes of the previous ASIF Sub Committee shall be submitted, held as
read and be formally moved and be held to be approved, unless objection
45

Page 46

is taken to any portion thereof when so submitted.  Any Member may
request information on an item within a Minute that is before the meeting;
and 
(iii) Any other competent business detailed in the agenda or urgent business
raised at the discretion of the Chair. 
ORDER OF DEBATE 
Motions/Amendments 
11.1 A member of the ASIF Sub Committee when speaking shall address the Chair
and direct all remarks to the matter before the meeting by proposing, seconding
or speaking to the motion or any amendment relative thereto, or to a point of
order, or to propose or second a motion to adjourn the proceedings. 
11.2 Every motion or amendment shall be moved and seconded.   The terms of all
motions or amendments shall always precede any remarks to be made by their
proposers.   No member shall speak supporting the motion or any amendment
until the same shall be seconded. 
11.3 The terms of a motion or amendment not seconded, or which may be withdrawn
or altered after being seconded shall not be recorded in the Minutes of
proceedings. 
11.4 Any member who has moved a motion or amendment and has failed to find a
seconder may request that his or her dissent in regard to the decision in question
be recorded and that dissent will be recorded in the Minutes. 
Procedure on Point of Order 
11.5 A member may speak upon a matter of order and on doing so shall make a short
statement precisely detailing the terms of the point of order.   If the Chair decides
that the question raised by the speaker is not a ‘point or order’, the member who
raised the point of order shall thereupon accept the decision as final.  No other
member shall be entitled to speak to that point of order.   A member who is
addressing the meeting when a question of order is raised shall give way until
the question of order has been decided by the Chair. 
MOTION FOR ADJOURNMENT OF MEETING 
12.1 A motion for the adjournment of the meeting for a specified period of time may
be put at the conclusion of any speech and shall have precedence over all other
motions.   It must be moved and seconded without a speech and shall at once
be put by the Chair in the form of “For Adjournment” or “Against Adjournment”. 
12.2 A second motion for the adjournment of the meeting shall not be made within a
period of 30 minutes unless it is moved by the Chair, when it shall be dealt with
as in the immediately preceding standing order.
46

Page 47

VOTING 
Method of Voting on Motion and Amendment 
13. The method of voting on motions and amendments shall be as follows :- 
(i) When a motion and one amendment only are before the meeting, a vote
shall be taken between the motion and the amendment. 
(ii) When a motion and two or more amendments are before the meeting, the
vote shall be taken upon all the proposals, each member having one vote.  
If a proposal receives the support of a majority of the members taking part
in the vote, it shall be declared to be the decision of the meeting, but, in the
event of none of the proposals receiving the support of such a majority, the
proposal which has received the least support shall be dropped and the
vote shall be taken anew upon the remaining proposals and so on until one
proposals has received the support of such a majority whereupon it shall
be declared to be the decision of the meeting; and 
(iii) In the event of the votes for two or more proposals being equal the Chair
shall decide which of them shall be dropped. 
DECISIONS OF THE ASIF SUB-COMMITTEE
14. Subject to Standing Order 15, all decisions before the ASIF Sub Committee shall
be decided by a majority of the Members of the meeting present and voting
thereon. 
CASTING VOTE 
15. In the case of an equality of votes, the Chair shall have a second or casting vote,
except where the matter which is the subject of the vote relates to the
appointment of a member of the ASIF Sub-Committee to any particular office, in
which case the decision shall be by lot. 
ATTENDANCE BY MEMBERS AND ADVISORS WHO ARE NOT A MEMBER OF
THE ASIF SUB COMMITTEE 
16. Members of the Constituent Authorities and Advisors who are not members of
the ASIF Sub Committee may be invited by the Chair of the ASIF Sub Committee
to attend the meeting of the ASIF Sub Committee while there is under discussion
any item in which those members have a local or other special interest.   Such
members and advisors shall be entitled to participate in the discussion on that
item but shall not be entitled to vote. 
47

Page 48

ATTENDANCE BY MEMBERS OF THE PUBLIC 
17. Members of the public may, subject to any limitation on numbers that may be
required due to Health and Safety considerations or availability of space or
seating in the meeting room, attend any part of the meeting of the ASIF Sub
Committee except during an item of business where the meeting has resolved,
in terms of the Local Government (Scotland) Act 1973 (as amended), that the
matter should be discussed in private session.  
48

Page 49

Appendix 3
Ayrshire Economic Joint Committee 
Ayrshire Skills Investment Fund Sub Committee 
Minutes of Meetings
25th January 2023
20th March 2023
11th September 2023
9th October 2023
20th November 2023 
Ayrshire Economic Joint Committee Sub Committee 
Ayrshire Skills Investment Fund  
20th March 2.00pm – 3.30pm 
Location: MS Team 
In attendance
Laura Neill     North Ayrshire Council (Chair)
Councillor Burns    Leader of North Ayrshire Council
Juliet Dempster    North Ayrshire Council
Emma McMullen    North Ayrshire Council
Helen Noble    Scottish Enterprise
Anne Campbell    Ayrshire College
Stuart Millar     Ayrshire College
Paul Zealey     Skills Development Scotland
Bethany Handysides McKechnie Skills Development Scotland
Councillor Reid    East Ayrshire Council 
Cat Hester     East Ayrshire Council 
Ian Burgoyne    East Ayrshire Council 
Councillor Pollock    South Ayrshire Council 
Heather Anderson    South Ayrshire Council 
Graham Saunders    PMO, Ayrshire Growth Deal
Chris Kennedy   GMB   
Apologies
Jamie Tait     South Ayrshire Council
Louise McDaid    Unison
Andy Macfarlane    Unite 
1.  Welcome & Introductions  
Laura welcomed all in attendance to the Ayrshire Economic Joint Committee Sub
Committee: Ayrshire Skills Investment Fund meeting.  This is the first meeting of the
Sub Committee who has delegated authority to create and implement the Ayrshire
Skills Investment Fund (ASIF) 
2.  Ayrshire Skills Investment Fund 
Presentation from Laura Neill NAC
Action 
49

Page 50

ASIF Presentation
250123.pptx
The Outline Business Case (OBC) is not approved, yet, by the
Scottish Government. 
Cllr Pollok asked is there a limited number of applications: the
financial profile is £3.5million with £500,000 to deliver the fund and
£3million to fund training interventions for 1000 people.
Anne Campbell highlighted the importance of mapping existing
provision, mechanisms and funding streams to avoid duplication and
enrich the existing offers, emphasising this fund will support training
where a funding gap exists. 
Graham Saunders highlighted the importance to capitalise on this
funding and what it can do to hook additional funding in future. 
Awaiting
Approval
from SG for
OBC – keep
updated on
progress. 
Mapping
exercise to
identify
existing funds
with report
back to the
next meeting 
3.  Ayrshire Skills Investment Plan 
Presentation from Paul Zealey SDS on the Plan
Ayrshire RSIP 
– the plan is published on the SDS Website
https://www.skillsdevelopmentscotland.co.uk/media/49339/ayrshire-
regional-skills-investment-plan.pdf 
Action 
4.  Regional Skills Assessment 
Bethany Handysides McKechnie, SDS, presented the Regional skills
Assessment for Ayrshire:
PowerPoint Presentation (skillsdevelopmentscotland.co.uk) 
Questions & points raised
Councillor Pollok highlighted the importance of linking future skills
requirement back to schools and curriculum to ensure we have future
talent for these roles e.g., Aerospace 
Councillor Burns highlighted importance of Community Wealth
Building across region and sectors currently struggling to recruit
including NHS and HSCP. 
Cat Hester asked about the 500 aerospace jobs and importance of
training for all levels to allow local people to access these jobs. 
Heather Anderson stated her team has requested a specific
breakdown of the Aerospace/Space vacancies and skills levels
required. 
Action 
Identify Gaps
in skills
provision
along with
flexibility of
existing
funding. 
50

Page 51

Ian Burgoyne provided an overview of the work with Ayrshire College
to increase access for young people through use of foundation
apprenticeships and similar models to support key specialisms e.g.,
Loudon Academy, Food & Drink. 
Anne Campbell detailed the importance of involvement in our
conversations from Directors of Education, Scotland’s Colleges,
Scottish Government and SSSC to ensure success of the offer.
Graham Saunders stated it was important that local people should
benefit from AGD and CWB indicators and measures that are linked
to skills. 
5.  Regional Economic Strategy 
Emma McMullen presented on the RES 
Regional Economic
Strategy Ayrshire 
Action 
6.  AEJC Sub Committee 
• ASIF Terms of Reference 
• Timescales 
• Implementation plan 
Action 
To be
approved at
next mtg 
7.  Any Other Business 
Catherine Hester highlighted importance of considering also NOLB
projects along with Shared Prosperity Fund implementation and
consider opportunities to positively impact child poverty with
opportunities for parents. 
Action 
Include
NOLB
Delivery
Plans in
funds and
skills
development
mapping 
8.  Date of next meeting  
20th March 2023 at 2.00pm on MS Teams 
Action 
51

Page 52

Ayrshire Economic Joint Committee Sub Committee 
Ayrshire Skills Investment Fund 
20th March 2.00pm – 3.30pm
Location: MS Team
In attendance
Laura Neill     North Ayrshire Council (Chair)
Councillor Burns    Leader of North Ayrshire Council
Councillor Reid    East Ayrshire Council 
Helen Noble    Scottish Enterprise
Anne Campbell    Ayrshire College
Paul Zealey     Skills Development Scotland
Allan Swan    South Ayrshire Council 
Graham Saunders    PMO, Ayrshire Growth Deal
Chris Kennedy   GMB  
Apologies
Juliet Dempster    North Ayrshire Council
Emma McMullen    North Ayrshire Council
Councillor Pollock    South Ayrshire Council 
Jamie Tait     South Ayrshire Council
Heather Anderson    South Ayrshire Council 
1.  Welcome & Introductions  
Laura welcomed all in attendance to the Ayrshire Economic Joint Committee Sub
Committee: Ayrshire Skills Investment Fund meeting. 
2.  Minutes of the Last Meeting and Matters Arising  
The Minutes were approved as an accurate record of the meeting. 
Laura provided an update that the Outline Business Case (OBC) is
not approved by the Scottish Government.
Action 
LN: Continue
to progress
OBC
approval 
3.  Terms of Reference  
The draft version of the ToR was shared and discussed.  
Anne Campbell requested reference to the Skills Working Group be
included, links to the 6 x workstreams and an emphasis on priority
sectors not growth sector where existing provision is not available
adding or flexible or responsive.
Action 
LN: Update
ToR as Draft
V2 for
approval at
the next
meeting 
4.  Ayrshire Skills Investment Fund Update 
The forecast financial profile was shared showing the planned outputs
and budget from 2023/24 – 2027/28.   The budget will fund
staff/resources to deliver up to £500,000 and a £3million fund to
support the skills development of 1000 people, the unit cost of training
is £3,000 per person. 
Action 
52

Page 53

5.  Mapping Existing Funds
A mapping exercise to identify existing skills development funds and
opportunities has commenced and will continue to ensure this is
comprehensive
Action 
LN: Continue
Mapping 
6.  Island Skills Fund Grant Programme Model  
Laura provided an overview on the North Ayrshire Island Skills
Initiative, a recent Grants programme with an open process, aligned
with the Island Plan which approved 26 awards to support skills
development for individuals, employers and training providers. 
Helen highlighted Scottish Enterprise’s Innovation Fund which awards
£5,000 per applicant – Helen agreed to share criteria/documentation
for this fund 
Anne Campbell highlighted the need to prioritise/maximise this
investment, clear criteria with expectations is required to provide a
framework for decision making.   
It was agreed Laura, Anne and Paul would meet to develop a draft
framework. 
Councillor Burns highlighted unemployment is falling, vacancies are
increasing, this must be considered as part of the fund development. 
Action 
To be
approved at
next mtg 
HN: Share
Innovation
Fund details 
AC, PZ, LN to
develop
assessment
framework 
7.  Any Other Business 
No other business was raised 
Action 
8.  Date of next meeting  
To be arranged 
Action 
LN: arrange
meeting
dates 
53

Page 54

Ayrshire Economic Joint Committee Sub Committee: ASIF
11th September 2.00pm – 3.30pm
Location: MS Teams
In attendance
Laura Neill     North Ayrshire Council (Chair)
Councillor Burns    Leader of North Ayrshire Council
Neale McIlvanney   North Ayrshire Council
Matt Strachan   North Ayrshire Council
Emma McMullen    North Ayrshire Council
Juliet Dempster    North Ayrshire Council
Anne Marie McCabe  Scottish Enterprise
Anne Campbell    Ayrshire College
Paul Zealey     Skills Development Scotland
Councillor Pollock    South Ayrshire Council 
Heather Anderson    South Ayrshire Council
Apologies
Jamie Tait     South Ayrshire Council
Councillor Reid    East Ayrshire Council 
Ian Burgoyne    East Ayrshire Council 
Mags Watson    East Ayrshire Council 
Graham Saunders    PMO, Ayrshire Growth Deal
Chris Kennedy   GMB
Louise McDaid    Unison 
Andy McFarlane   Unite 
Milan Radosavlijevic  UWS
Jonny Mone    UWS
Stuart Millar     Ayrshire College 
Bethany Handysides McKechnie Skills Development Scotland 
1.  Welcome & Introductions  
Laura welcomed all in attendance to meeting. 
2.  Minutes of the Last Meeting 
The Minutes were approved as an accurate record of the meeting. 
3.  Matters Arising 
Laura reported the OBC and FBC was now approved by the Scottish Government
and the Ayrshire Economic Joint Committee. 
4.  Terms of Reference
The draft version of the ToR was shared, discussed and approved.  It
was later agreed during the meeting there was a requirement to
ensure representative of elected members was required across all 3
councils and the ToR would be updated accordingly following legal
advice.    A revised version will be presented at the next meeting. 
Action 
LN: revised
version
presented to
next meeting. 
5.  Ayrshire Skills Investment Fund Delivery Model  Action 
54

Page 55

A paper was circulated in advance, setting out a proposed ASIF
Delivery Model to include 3 lots targeting priority sectors and priority
groups.    
ASIF Delivery Model
Report 110923
Laura shared a presentation providing further detail on the proposed
Delivery Model.
AGD Delivery Model
110923
The key aspects include 3 Lots:
1. Training Grants: Ayrshire College, UWS and in the future to
consider further training providers (Implement 2023)
2. Open Procured Framework (ITT: November 2023, Implement
2024)
3. Employer Grants (Implement 2023) 
The priority sectors, which may change in the future, are proposed as:
• Engineering
• Digital 
• Visitor Economy 
• Clean Growth 
The priority groups have been identified through the inclusive growth
diagnostic to be supported are:
• Young people 
• Females
• People with long term health conditions
• People in low paid employment 
The financial profile includes a significant investment for 23/24, delays
to approval now reduce time to deliver/spend, this will need to be
monitored closely to reduce risk of losing these funds, a reprofiling
request may be required. 
Following the presentation there was a discussion and the following
points were raised:
MS: asked questions on restrictions, SMEs, larger companies and
inward investment opportunities.  This will all be considered as part of
the Employer Grants guidance and shared for consideration and
approval  at the next meeting. 
Cllr Pollock: Noted the budget of £40,000 for research and highlighted
the need to ensure ongoing research to ensure the right people are
targeted.  Councillor Pollock discussed the need within the Aviation
Industry to ensure people have numeracy skills and the previous 
LN to send
presentation 
LN: Monitor
financial
profile closely
and report to
sub
committee 
LN: Develop
guidance for
approval at
next meeting 
Ongoing
research
process
required 
55

Page 56

Skypath programme targeting long term unemployed people did not
meet the needs of employers. 
EMcM: Reported the Community Wealth Building AGD Project is
completing a mid-term review, the end date for this project is 31st
March 2024 and confirmed support for the Fair Work Ayrshire aspect
to be continued delivering Fair Work and Skills, with future funds from
ASIF staff budget.  This links to the Regional Economic Strategy
(RES) with the RES Delivery Plan being considered by the AEJC. 
NMc: Noted Legal have provided advice on Subsidy Control, this will
be considered on a case-by-case basis with Grantees self-declaring. 
Neale also reported an initial conversation had been held with EKOS
to consider a research proposal to consider all capital investment and
to ensure skills are considered to maximise opportunities arising from
AGD and other capital investments noting skills are key to landing big
investments. 
Cllr Burns: Highlighted need to ensure people can access pathways
to learning, they need to get a foot on the path, and we need to use
learning from previous employability programmes. 
AC: Reported Ayrshire College have recently recruited 50 new
aerospace Apprentices with 28 of these people progressing from
pathway programmes, highlighting the need for pre-readiness
programme on clusters. 
NMc: Highlighted the important of ensuring a strong Communications
Plan to support the implementation of ASIF was necessary.  It was
agreed Michele McColm, Senior Manager, Communications, North
Ayrshire Council would be invited to the next meeting. 
The Delivery Model, including the delivery model, priority sectors and
target groups were agreed by the ASIF Sub Committee, with no
objections.  Guidance and processes will be considered at the next
meeting to enable the ASIF to be launched. 
Explore
EKOS
proposal
further 
Ensure
learning from
previous
programmes
to enable
access 
LN: Comms
to be
included as
an agenda
item at next
meeting 
6.  Mapping Existing Funds
Mapping of existing provision continues to ensure this is in place to
ensure the ASIF supports gaps in current provisions.  Laura reported
this is extensive and there are a lot of training interventions currently
available, however there remains lots of gaps in skills which do result
in loss of productivity. 
AC shared an example of an employer in the Engineering sector who
lost 8 employees to a larger employer which resulted in the loss of
£1million of business.  Availability of people and skills is essential to
maximise productivity and the Ayrshire economy.
Action 
LN: Continue
Mapping 
56

Page 57

7.  Any Other Business  
None 
Action 
8.  Date of next meeting  
9th October at 2.00pm on MS Teams 
Action 
57

Page 58

Ayrshire Economic Joint Committee Sub Committee: ASIF
9th October 3.00pm – 4.30pm
Location: MS Teams
In attendance
Laura Neill     North Ayrshire Council (Chair)
Matt Strachan   North Ayrshire Council
Juliet Dempster    North Ayrshire Council
Anne Marie McCabe  Scottish Enterprise
Anne Campbell    Ayrshire College
Paul Zealey     Skills Development Scotland
Councillor Pollock    South Ayrshire Council 
Heather Anderson    South Ayrshire Council
Mags Watson    East Ayrshire Council 
Graham Saunders    PMO, Ayrshire Growth Deal
Milan Radosavlijevic  UWS
Suzanne McQuade   UWS
Michele McColm   North Ayrshire Council 
Apologies
Councillor Burns    Leader of North Ayrshire Council
Neale McIlvanney   North Ayrshire Council
Emma McMullen    North Ayrshire Council
Ian Burgoyne    East Ayrshire Council 
Jamie Tait     South Ayrshire Council
Councillor Reid    East Ayrshire Council 
Chris Kennedy   GMB
Louise McDaid    Unison 
Andy McFarlane   Unite 
Jonny Mone    UWS
Stuart Millar     Ayrshire College 
Bethany Handysides McKechnie Skills Development Scotland 
1.  Welcome & Introductions  
Laura welcomed all in attendance to meeting. 
2.  Minutes of the Last Meeting 
The Minutes were approved as an accurate record of the meeting. 
3.  Matters Arising 
No matters arising. 
4.  Communications Strategy
Michele McColm from NAC had drafted a detailed ASIF Comms Plan
and detailed activity and timeline.  The group agreed to take this
forward and found it very comprehensive and fit for purpose. 
Michele mentioned recent discussions have highlighted the
importance of involving education/schools to ensure
Action 
LN: to share
comms plan 
58

Page 59

pupils/teachers/parent understand the key sectors for employment in
Ayrshire and build strong foundations to grow local talent. 
Graham Saunders - reinforced this from an Ayrshire Growth Deal
perspective as schools make requests to gain more AGD knowledge. 
Next meeting could include employer case studies to show clear
career pathways for S3 pupils. 
Anne Campbell – requested that any school/AGD enquiries are
directed to Ayrshire Skills Group so needs can be reflected in CIAG
and skills plan. 
5.  Terms of Reference
Laura explained that the ToR will be redrafted to include a Quorum for
decision making where a requirement to ensure representative of
elected members was required across all 3 councils and the ToR
would be updated accordingly following legal advice.   In addition to
this trade unions, Scottish Enterprise and SDS would attend.  FE and
HE partners would attend in advisory capacity only with no voting
rights on fund allocation.
Action 
LN: revised
version
presented to
next meeting. 
6a.  Ayrshire Skills Investment Fund Delivery Model 
The delivery model was agreed at last meeting.
AGD Delivery Model
110923
ASIF Delivery Model
Report 110923
The key aspects include 3 Lots:
4. Training Grants: Ayrshire College, UWS and in the future to
consider further training providers (Implement 2023)
5. Open Procured Framework (ITT: November 2023, Implement
2024)
6. Employer Grants (Implement 2023) 
The priority sectors, which may change in the future, are proposed as:
• Engineering
• Digital 
• Visitor Economy 
• Clean Growth 
The priority groups have been identified through the inclusive growth
diagnostic to be supported are:
• Young people 
• Females
• People with long term health conditions
• People in low paid employment 
Action 
59

Page 60

The financial profile includes a significant investment for 23/24, delays
to approval now reduce time to deliver/spend, this will need to be
monitored closely to reduce risk of losing these funds, a reprofiling
request may be required.
Anne Campbell from Ayrshire College discussed an outline proposal
delivery model for Lot 1
This includes.
• Engineering – focus on the aerospace cluster in first instance and
will expanding to include XL-CC and manufacturing in East
Ayrshire.
• Digital
• Food & Drink
• Clean Growth
The engineering discipline will include.
• Aerospace
• Welding
• Manufacturing
• Robotics
There will be 15 cohorts offering 180-200 places running Jan 2024 to
June 2025.  Aimed at upskilling the economically inactive with hand
skills, economically inactive without skills and new candidates,
Work placements will key within this opportunity and would welcome
employers to come forward.  A proposal for Digital could also be
confirmed at next meeting.  It was agreed Ayrshire College will
present the proposal at the next meeting detailing skills requirements
for engineering sector and value of fund request. 
Cllr Pollok – mentioned that many companies are moving from the
apprenticeship model to trusteeships and traineeships with inhouse
training programmes. 
David McDowall – mentioned that it would be beneficial to develop
the food & drink proposal as the challenges in this sector are
increasing. 
Laura mentioned that the proposals will be raised in Ayrshire Skills
Group to make sure sector needs are met. 
Milan Radosavljevic - mentioned he agrees with the proposal and in
the case of clean growth we need to look at the short term needs of
the sector and local area, skills planning. 
Mags Watson – mentioned she is currently working on a digital
collaboration pilot and agreed with the importance of increasing the
attractiveness of the region. 
Laura – keen to consider UWS proposal Suzanne and Milan to try to
develop proposal for next meeting after they have energy master plan
draft from consultants. 
AC to present
delivery
model at next
meeting. 
60

Page 61

Suzanne McQuade – agreed to look at year 1 proposal. 
6b. Employer grants guidance discussed, and dates /meetings
/approvals agreed. 
Milan – mentioned the geography might cause employers or
candidates to miss out. Laura explained it had to focus on Ayrshire
residents and businesses as a commitment to Ayrshire Growth Deal. 
Laura detailed there will be a steering group and representation from
across the three business development teams would be considered. 
Mags Watson – will share her learnings on the EAC training grant to
prevent any duplication. 
Anne Marie McCabe – mentioned MFA disclosure and is also willing
to review form and guidance. Once launched will also share with
employers who could apply for funding. 
LN: To share
Lot 3
employer
form and
guidance with
business
development
teams for
review and
comments. 
7.  Research Proposal 
EKOS research has shown is that industry and schools and
connected so information is fed back into the education system. 
Laura detailed it is so important right skills get to the right people and
skills gaps are reduced.  Ayrshire College, SDS and EKOS will look at
proposal with education to clearly identify the career pathways of the
future that AGD investment will create. 
Action 
8.  Any Other Business  
None 
Action 
9.  Date of next meeting  
20th November at 3.00pm on MS Teams 
Action 
61

Page 62

Ayrshire Economic Joint Committee Sub Committee: ASIF
20th November 3.30pm – 5.00pm
Location: MS Teams
Present 
Laura Neill     North Ayrshire Council (Chair)
Councillor Burns    Leader of North Ayrshire Council
Juliet Dempster    North Ayrshire Council
Emma McMullen    North Ayrshire Council
Councillor Reid    East Ayrshire Council
David McDowall   East Ayrshire Council
Ian Burgoyne    East Ayrshire Council 
Councillor Pollock    South Ayrshire Council 
Allan Swan    South Ayrshire Council
Graham Saunders    PMO, Ayrshire Growth Deal
Anne Marie McCabe  Scottish Enterprise
Anne Campbell    Ayrshire College
Suzanne McQuade   UWS 
In Attendance 
Alison Cairns    EKOS
Chris Kelly    EKOS
Gemma Donnelly   EKOS
Michael Dunn    EKOS
Avril Thompson   NMIS    
Apologies
Matt Strachan   North Ayrshire Council
Neale McIlvanney   North Ayrshire Council
Paul Zealey     Skills Development Scotland
Mags Watson    East Ayrshire Council 
Heather Anderson    South Ayrshire Council
Jamie Tait     South Ayrshire Council
Stuart Millar     Ayrshire College 
Milan Radosavlijevic  UWS
Jonny Mone    UWS
Chris Kennedy   GMB
Louise McDaid    Unison 
Andy McFarlane   Unite 
1.  Welcome & Introductions  
Laura welcomed all in attendance to meeting. 
2.  Minutes of the Last Meeting 
The Minutes were approved with an amendment to attendance to include David
McDowall, East Ayrshire Council who attended. 
3.  Matters Arising 
No matters arising. 
62

Page 63

4.  EKOS Research Findings
Michael Dunn, Gemma Donnelly, and Alison Cairns presented EKOS
research.  Slides supplied for reference:
Ayrshire Skills
Mapping
Action 
LN: to share
EKOS slides 
5.  Terms of Reference
Laura explained that the ToR has been updated to reflect the need for
a Quorum for decision making and final approval.  Will share in
advance of next meeting to allow for legal approval from all
attendees. 
Action 
LN: to share
updated ToR
in advance of
next meeting. 
6.  Ayrshire Skills Investment Fund Proposals for Consideration
for funding 
This section of the meeting was moved to the start of the agenda to
ensure quorum for fair decision-making process.  Laura provided
overview of activity to date on fund activity. 
a) Training Providers Grants: Ayrshire College Full Proposal 
Anne Campbell for Ayrshire College had provided a fully detailed
written proposal prior to the meeting and Laura had circulated in
advance for consideration.  Anne provided an overview of the
proposal:
• Courses would have full campus coverage where possible.
• Courses would run from Feb 2024 to June 2025
• Engineering focus on CNC, Aerospace and Welding
• Clean Growth would have a net zero focus
• Digital courses would have pathways to support further study at
UWS 
David McDowall – asked for clarification on locations to ensure that
those in more rural Ayrshire have the chance to access the
opportunities. Will discuss at LEP to see if assistance to these
candidates is available.  Anne happy to discuss with LEPs. 
Ian Burgoyne – asked about selection criteria and economically
inactive terminology.  Anne confirmed unemployed candidates within
target groups will be eligible.  Anne detailed that there will be inclusive
support to potential candidates with interview/entry conversations to
match to opportunities, but engineering could be more challenging
due to specialisms. 
Decision – Funding of £693,000 for the Ayrshire College
proposal with £60,600 from 23/24 allocation was approved with
Councillors Burns, Reid and Pollok confirming agreement. 
Action 
63

Page 64

b) Employer Grants Programme: Evaluation Panel
Recommendations for approval
Juliet shared an overview of all proposed employer grants by local
authority area to support the report previously circulated.  No
questions were raised, members noted a good variety of
applications had been received. 
Decision – Funding of £60,180 for the employer grant requests
for 23/24 was approved Councillors Burns, Reid and Pollok
confirming agreement.   
Employers will not be informed until the 24th of November, details of
decisions are confidential until this announcement.  These approvals
are all subject to subsidy control assessments and fair work
conditionality. 
7.  Ayrshire Skills Investment Fund – Outline Proposals
a) University of West of Scotland
Susanne McQuade presented an outline proposal from UWS,
targeting economically inactive/unemployed individuals and also 
businesses to explore existing talent and upskill staff.  Delivery
would start early next year with 11 cohorts across 4 areas to
support 130-165 individuals at a cost of £400,000. 
Allan Swan – asked about how it could attract applicants out with the
region. It was confirmed there would be selection process, but the
eligibility criteria are people supported must all live in Ayrshire. 
David McDowall is interested to see more detail on the offer at next
meeting. 
It was agreed UWS would present a detailed proposal at the next
meeting. 
b) NMIS
Avril Thompson, Head of Skills at NMIS presented and slide
included a suite of both free and costed training opportunities
covering, engineering, digital and clean growth target sectors,
including internships.  It is designed in the form of employer
vouchers to a maximum of £3000 for Ayrshire employers only.  
Blended delivery of online and f2f with 3 price bands up to £3000. 
A free skills consultation can be offered to employers to assess
need. 
Action 
Share UWS
presentation 
UWS ASIF
Framework - slide.pdf 
Susanne to
supply
detailed
proposal in
advance of
next meeting 
NMIS
Proposal
NMIS
ASIFvouchermenu 
Complete
mapping of
current LA
offers
64

Page 65

David McDowall – expressed that the offers need to be mapped in
line with existing opportunities in each of the LA’s and that pricing is
consistent across the board.  Laura agreed and a mapping exercise
will be done before next meeting. 
8.  Any Other Business  
No other business.
Laura reminded the group that grant decisions are not yet public and
will be subject to Subsidy Control and Fair Work First conditionality
being confirmed by Scottish Government. 
Action 
9.  Date of next meeting  
12th February 2024 at 3.00pm on MS Teams, it is noted this date may
be subject to change as the meeting must have a quorum in
attendance to enable decisions to be taken. 
Action 
Confirm date
is suitable for
all   
65

Page 66

66