Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Tuesday, 28 March 2023 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 31 January 2023 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Petition: West Kilbride Glen Extension Grass Cutting
Submit report by the Head of Service (Democratic) on the terms of a
petition received in respect of grass cutting at the West Kilbride Glen
Extension (copy enclosed). 
4 Accounts Commission’s Report: Local Government in Scotland:
Financial Bulletin 2021-22
Submit report by the Head of Finance on the findings of the recent
Accounts Commission report (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 External Audit Plan 2022/23
Submit report by the Head of Finance on the External Audit Plan for
2022/23 (copy enclosed). 
6 Council Plan Mid-Year Progress Report 2022-23
Submit report by the Head of Service (Democratic) on progress with
Council Plan priorities (copy enclosed). 
7 Internal Audit Plan 2023/24
Submit report by the Head of Service (Finance) on the proposed Internal
Audit Plan for 2023/24 (copy enclosed). 
8 Internal Audit and Corporate Fraud Action Plans: Quarter 3 Update
Submit report by Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 31 December 2022 (copy enclosed). 
9 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between January and February 2023 (copy
enclosed). 
10  Internal Audit Charter 2023
Submit report by the Head of Service (Finance) on the updated Internal
Audit Charter (copy enclosed). 
11  Urgent Items
Any other items which the Chair considers to be urgent. 
12  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
13  Investigation Reports Issued
Submit report by the Head of Service (Finance) on investigation reports
finalised since the last meeting (copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Ian Murdoch
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

Audit and Scrutiny Committee
31 January 2023 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Cameron Inglis, Matthew McLean and John Sweeney. 
Present (Remote Participation)
Tom Marshall and Davina McTiernan. 
In Attendance (Physical Participation)
A. Sutton, Executive Director (Communities and Education); T. Reaney, Head of
Service (Neighbourhood Services) (Place); M. Boyd, Head of Service and L. Miller,
Senior Manager (Audit, Fraud, Safety and Risk) (Finance); F. Walker, Head of
Service and B. Quigley, Senior Manager (ICT) (People and ICT); and A. Craig, Head
of Service and D. McCaw, H. Clancy and S. Wilson, Committee Services Officers
(Democratic Services) (Chief Executive’s Service). 
Also in Attendance (Physical Participation)
Councillor Stewart Ferguson. 
Chair
Councillor Bell in the Chair. 
Apologies
Eleanor Collier and Ian Murdoch. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Audit and Scrutiny Committee held on 15 November
2022 were confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973. 
3. Elected Member Service Requests 
Submitted report by the Head of Service (Democratic) on the Elected Member
constituent services request/query process and performance for the period 1 April to
30 September 2022.  Appendix 1 to the report detailed the process when service
requests/queries were received from constituents, including information on Stage One
and Stage Two requests, with Appendix 2 detailing the process when constituent
complaints were received. 
Agenda Item 2
5

Page 6

Members asked questions and were provided with further information in relation to:- 
• any crossover between service requests and complaints;
• how service requests and complaints should be progressed by Elected
Members;
• the ability of Elected Members to contact Heads of Service in relation to any
constituent complaint;
• Officer responses advising Elected Members of a service request completion,
with the request then being closed off on the EMPro system; and
• the potential for a review of the EMPro system to reflect a two-stage process to
reflect closure of an initial request with a subsequent timescale prompt added
for completion of any resultant action required. 
The Committee agreed (a) to note the terms of the report and information provided;
(b) that the Head of Democratic Services bring a report on Elected Member service
requests via EMPro to a future meeting to coincide with the annual report on
corporate complaints; and (c) that the Head of Democratic Services review the
process for dealing with requests from Elected Members to consider the approach
required to ensure requests and resultant actions are fully closed off by Services,
and provide the Committee with an update in due course. 
4. Internal Audit Reports Issued  
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed between November and December 2022.  The findings from five
audit assignments were detailed at Appendix 1 to the report, together with the
respective executive summaries and action plans. 
Members asked questions and were provided with further information in relation to:- 
Facilities Management Procurement
• any restrictions on meal choices within schools;
• food waste arising from uncollected schools meals as a result of strike action;
• the provision of grab-and-go meals on strike days;
• unused food being shared with local community centres for distribution; and
• the trialing of a catering van to address picket line concerns. 
The Senior Manager (Audit, Fraud, Safety and Risk) undertook to contact Facilities
Management for an update on meal choices within schools. 
Accounts Payable Transaction Testing Q2
• the detection of duplicate invoices;
• further improvements in terms of suppliers on the system where no bank details
were provided; and
• occasions where supplier bank details matched a Council employee’s bank
details. 
Scottish Housing Regulator Annual Assurance Statement
• the updating of the self-assessment toolkit as part of the action points arising
6

Page 7

from the audit.
Members asked for further clarification regarding the slow implementation of fire
alarm legislation within Council homes and the Senior Manager (Audit, Fraud,
Safety and Risk) undertook to request an updated position from the Service. 
The Committee agreed to note the outcomes from the Internal Audit work completed
as set out in the report and detailed in Appendix 1 to the report. 
5. Exclusion of the Public – Para 1 
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph 1 of Part 1
of Schedule 7A of the Act. 
6. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) on the findings of an Internal
Audit review completed in November 2022. 
Noted. 
The meeting ended at 10.45 a.m. 
7

Page 8

8

Page 9

NORTH AYRSHIRE COUNCIL 
28  March 2023 
Audit and Scrutiny Committee 
Title:    Petition: West Kilbride Glen Extension Grass Cutting 
Purpose:  To advise the Committee of the terms of a petition with regard
to grass cutting at the West Kilbride Glen Extension. 
Recommendation:  That the Committee considers the terms of the petition and
agrees, or otherwise, to make a recommendation to Cabinet. 
1. Executive Summary 
1.1   In terms of the Scheme of Administration, the Audit and Scrutiny Committee has a remit: 
“To receive all petitions and deputations submitted to the Council except those relating
to the Council’s planning functions, which shall be considered by the Planning
Committee.  The arrangements for receiving petitions are as set out in Appendix B to
the Standing Orders relating to Meetings and Proceedings of the Council and
Committees”. 
1.2 This report sets out the background to the receipt by the Council of 251 individual letters
addressed to the Chief Executive in relation to grass cutting at the West Kilbride Glen
Extension which were acknowledged as equivalent to a petition in terms of the Council’s
Deputations and Petitions Procedure on 26 January 2023. 
2. Background  
2.1 The wording of each individual letter forming the petition is detailed below: 
“Would you please, for one final time, instruct your senior members of staff in
Streetscene to continue the 100% grass cutting schedule in the Glen Extension, as it
is their intention to begin another 50% cut in 2023 season. 
It is only 2 years since this was last attempted, with the result the whole field was in
such an unsightly/unacceptable state local residents no longer used the facility. 
It took over 150 letters of objection to address the issue.” 
Agenda Item 3
9

Page 10

2.2 In response to a request for supporting information, the lead petitioner has indicated
that a previous approach was made by West Kilbride Community Council in 2020 to
the Council’s Streetscene section to only cut paths through the extension, to allow
wild flowers to grow, but that, by Autumn of that year, the whole area was overgrown
with three foot high dock weeds, ragwort etc. This resulted in 150 letters of objection
being submitted.  The lead petitioner advises that they and another objector met with
the then Head of Service, who gave instruction to have the whole area cleared and
normal maintenance restored.  However, in Autumn 2022, the Council was again
intending to cut 50% and let wild flowers grow in uncut area, which prompted the
current petition. 
2.3    The Head of Service (Commercial) has provided a briefing note on the background to
this matter, which is detailed at Appendix 1 to the report. 
2.4 In terms of the procedure for petitions and deputations set out in Standing Orders,
representatives of the petitioners have been invited to attend the meeting to address
the Committee.  Spokespersons should be restricted to addressing the specific points
raised in their petition. 
2.5 The spokespersons have, collectively, 10 minutes to address the Committee.  This may
be extended at the discretion of the Chair. 
2.6 Once the Committee has heard from the spokespersons for the petitioners, the Chair
will invite Members of the Committee to ask questions of the spokespersons. 
2.7 While it is for the Chair to decide the stage at which officers should speak to their
briefing, previous Committee practice has been for the Cabinet Member or Officer to
speak to this after the Committee has heard from the petitioners.  The Cabinet
Member or Officer will then respond to any questions that Members of the Committee
may have. 
3. Proposals 
3.1 It is proposed that the Committee considers the terms of the petition and agrees, or
otherwise, to make a recommendation to Cabinet.
4. Implications/Socio-economic Duty 
Financial 
4.1 The Streetscene revenue budget has financial pressures and relaxed grass cutting
initiatives, in appropriate areas, will help mitigate against this. 
Human Resources 
4.2 None arising from this report. 
Legal 
4.3  None arising from this report. 
Equality/Socio-economic
10

Page 11

4.4 None arising from this report. 
Climate Change and Carbon 
4.5 None arising from this report. 
Key Priorities 
4.6 None arising from this report. 
Community Wealth Building 
4.7 None arising from this report. 
5. Consultation 
5.1 The Head of Service (Commercial) has been consulted and made aware of the terms
of the petition and has provided a briefing note which is attached as Appendix 1 to the
report. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Diane McCaw, Committee Services Officer, on
01294 324132 
Background Papers
Correspondence with lead petitioner 
11

Page 12

Briefing Note – West Kilbride Glen Extension
Background
Over a period of many years, West Kilbride has been divided on how the community wishes
to see the Glen maintained with Environmental Groups wishing to see more relaxed grass
cutting/re-wilding and others wanting the status quo to remain and grass being cut as usual. 
In June 2019, Streetscene and Connected Communities commenced a programme of
consultation as part of Participatory Budgeting (PB) and responses received for the locality
priorities were as follows: 
An initial trial of planting was undertaken during summer 2020 although the success of this
was curtailed by the COVID pandemic. 
During 2021 a wildflower meadow project was established in Lochshore which has been
very successful and well received. This data has been used to inform options for the Glen
Extension.   
Historic Maintenance duties at West Kilbride Glen
• Glen extension cut 
• Glen entrance down to 2nd bridge cut and strimmed 
• Grass at side of football pitch cut and strimmed 
• Kirktonhall house cut and strimmed 
• Swing park area litter picked and blown before cutting
• Shrubs cut (winter work)
• Railway bridge entrance path cut 
• Flail work on access road to football park
• Paths blown (winter work)
Kirkton Glen Meadow Makers 
The Kirkton Glen Meadow Makers are a local group with environmental interests. They
contacted the Head of Service (Commercial Services) in Autumn 2020. The group undertook
their own local consultation and provided evidence of 200 responses to their consultation.
The groups proposal was a compromise between a complete ‘rewilding’ of the area and
NORTH COAST LOCALITY Count
I would like to see more fruit trees or alternative food planting 20
We should encourage wildlife and provide environmental benefits through
relaxed grass cutting  29
North Ayrshire council should encourage and support litter picks in towns
and woodlands 41
I would like to see wild and native flowers introduced to selected areas 35
North Ayrshire council should make planters or bedding areas available to
adopt 8
Locality total 133
12

Page 13

continued utility for a wide range of local residents and visitors. The group provided a rough
sketch which is detailed below. The proposal was that two discrete areas of the field are
developed into wildflower meadows; additionally, the existing ‘desire paths’ around and
across the field would be widened and an additional East-West path cut between the two
meadow areas, allowing the easy passage of, for example, buggies and/or wheelchairs. 
Communication with those against the environmental proposals 
The Head of Service (Commercial Services) communicated with those against the
environmental proposals on 12 April 2021 and stated that he 'agreed to continue to maintain
the Extension area regularly this year', which was the summer season 2021. 
Furthermore, a review of the outcomes from the Lochshore Project would be used to
determine if a similar pilot could be undertaken at West Kilbride Glen. 
I have been in further communication with those opposed to the environmental proposals
and in October 2022, I informed them of the following: 
‘As it stands, Streetscene continues to bear the brunt of hearing both sides of the argument,
with parties contacting Streetscene requesting relaxed grass cutting and yourself and others
wanting the grass cut. Given the climate emergency and the drive towards biodiversity and
saving the plant, all large scale grass cutting has to be reviewed and evaluated to consider
its appropriateness and to see what more can be done to help the environment. 
There were similar arguments to the one you're now making when relaxed grass cutting was
proposed for Stevenston Shore. However, a compromise was reached whereby areas of flat
land used for football, kite flying etc were cut as usual and areas with hills/mounds left uncut. 
This has been really successful and has delivered environmental benefits thanks to the
compromise agreed from both sides of the argument. I'm not aware of any complaints since
this was implemented. 
13

Page 14

We have also established a successful wild meadow at Lochshore. Year 1 was a mix or
annual and perennial flowers to create an immediate impact, with the perennials being the
predominant species from year 2 onward. Streetscene are working with the local schools
around harvesting seeds and then sowing at the appropriate time and they are also working
towards the creation of information boards to educate the public on the type of plant and
wildlife they can expect to see and what the benefits are to the local environment. 
The plan therefore is for a pilot to be undertaken for the 2023 grass cutting season with
approximately 50% cut/uncut. This can be achieved by leaving kidney shaped areas uncut
with wildflowers on the hill and cutting the areas surrounding it. This will create nectar
corridors and natural habitats for wildlife and help meet our environmental ambitions. 
Following the summer season there will be an opportunity for review, feedback and
evaluation of the pilot.’ 
Note: The 50% cut/50% uncut is only for the hillside at the Glen, all other maintenance will
be delivered as per the existing schedules. 
Assessment from NAC Biodiversity Officer 
Currently we are faced with the twin reinforcing crises of declining biodiversity and the
ongoing climate crisis. The loss in biodiversity is driving climate change and in turn the
changing climate is accelerating the rate of biodiversity loss. In Scotland, the evidence
around the scale and nature of the biodiversity crisis is strong and continues to mount. This
evidence base points consistently to a natural environment that has already been heavily
degraded, with continued declines across much of our land and seascapes. The Biodiversity
Intactness Indicator indicates that Scotland has retained just over half of its historic land-
based biodiversity. Scotland ranks 28th from bottom in the Biodiversity Intactness Index
(BII), a global analysis of how much human activity has impacted nature. 
As an outcome of COP15, the connection between biodiversity loss and climate change has
been formally recognised and gives international recognition for the role of local government
in addressing the nature crisis and giving effect to the Edinburgh Declaration. In response to
the Edinburgh declaration the Scottish Government has published the draft of the Scottish
Biodiversity strategy to 2045. Biodiversity strategy to 2045: tackling the nature emergency -
gov.scot (www.gov.scot). 
The goals for the strategy are very ambitious with a 2030 milestone of halting biodiversity
loss and being Nature Positive. It sets out a vision that encapsulates three core ideas: 
• that urgent action is needed at scale across our land and seascapes.
• that we are looking to the future – regenerating biodiversity and building resilience to
climate change.
• and that people and communities are central to a nature positive future. 
The ambitions for the plan are for Scotland to be Nature Positive by 2030, and to have
restored and regenerated biodiversity across the country by 2045. The strategies vision is
set out as: 
• By 2045, Scotland will have restored and regenerated biodiversity across our land,
freshwater, and seas.
• Our natural environment, our habitats, ecosystems, and species, will be diverse,
thriving, resilient and adapting to climate change.
14

Page 15

• Regenerated biodiversity will drive a sustainable economy and support thriving
communities, and people will play their part in the stewardship of nature for future
generations. 
To deliver the Vision, the strategy has identified a detailed set of Outcomes which help to
define and understand what success will look like by 2045: 
• Across our land and seascapes
• On land
• In rivers, lochs, and wetlands
• In marine and coastal environments 
These Outcomes will be achieved through detailed actions set out in Delivery Plans. This
Strategy contains 26 of the most urgent Priority Actions which will aim to put Scotland on
track for halting the loss of biodiversity and being nature positive by 2030. All 26 of these
actions will have an impact on how North Ayrshire Council (NAC) delivers on biodiversity
and climate change, but the three that will have the most immediate effect are: 
• The introduction of statutory nature restoration targets.
• The introduction of a programme of ecosystem restoration.
• The increase and safeguarding of space for coastal habitat change. 
Currently there are no statutory targets for nature restoration and their introduction could
have far reaching consequences for our service delivery, and the way NAC would manage
its wider estate. A clue to what will be expected on NAC in the future is shown in the
continuation of the Strategy to 2045’s vision statement. It states that “Towns and cities will
include nature-rich environments close to all communities, contributing to Nature Networks
and measurable increases in urban biodiversity, and “Multi-functional urban nature-based
solutions will enable people and biodiversity to adapt to our changing climate by cooling the
urban environment and managing extreme rainfall events, with blue and green
infrastructure designed and managed to benefit biodiversity, provide habitats, and allow
wildlife to move through urban areas”. By 2045 the strategy expects that the target driven
approach will have delivered an urban environment in which: 
• Patches of species-rich grassland and wee forests have replaced short amenity
grassland, with an increase in insect populations benefitting bird species such as
blackbirds and robins. Grassland sown with native wildflowers and grass species is
not mown until the flowers have either set seed or been eaten by birds such as
house sparrows.
• Children enjoy the urban outdoors both as a place to play and an outdoor classroom.
New urban ponds and existing ponds are colonised by wild plants and animals such
as yellow iris and dragonflies. Gardens are enjoyed for flowers, wild birds, animals,
and insects which control pests, entertain, and pollinate. Community gardens allow
people to grow and pick their own food and connect with nature.
• Buildings incorporate nest boxes for swifts, house martins and bats; green walls and
roofs; rooftop gardens; and window boxes. Vertical rain gardens and ponds help
reduce flash flooding and make neighbourhoods more attractive. Green areas join up
to allow pollinators and larger animals such as hedgehogs and frogs to travel across
the urban environment.
• Trees and other plants help clean the air and provide shade reducing the urban heat
island effect. Impermeable surfaces have been replaced with species-rich grassland
and urban woodland to increase soil biodiversity and capture carbon within the soil.
People benefit from clean air and access to species-rich green or blue spaces. 
15

Page 16

The delivery of the proposed project at West Kilbride will help to meet NAC’s current
commitment to biodiversity action. NAC’s commitment to biodiversity action is laid out in the
Environmental Sustainability & Climate Change Strategy 2021-23. In the strategy NAC
acknowledges the threat posed by net biodiversity loss and confirms its commitment to have
a response to biodiversity loss. The primary vehicle intended for delivering on biodiversity in
North Ayrshire is the Local Biodiversity Action Plan (LBAP). The LBAP highlights high quality
public greenspace as being a key component of NACs biodiversity commitment. An aim of the
LBAP is to create Quality Greenspace for Health and Education Benefits. This is to be
delivered by the implementation of priority biodiversity actions from the current North Ayrshire
Open Space Strategy (2016 – 2026). The biodiversity aims of the Open Space Strategy are
expressed through two strategic objectives: 
• Strategic Objective 1: Open Space will be promoted as a resource for tourism and
recreation, economic development & biodiversity.
• Strategic Objective 6: Respond to climate change through the delivery of a connected
and integrated network, incorporating water management, woodland area, and
biodiversity benefits. 
To be able to meet the prospective targets being introduced and deliver “measurable
increases in urban biodiversity”, NAC will have to go far beyond the current levels of habitat
creation in its public green spaces and wider estate. Grassland sown with native wildflowers,
along with relaxed cutting, will have to become the standard way of managing green space
along with an array of other habitat creation methods. The creation of wildflower meadows
and the implementation of relaxed grass cutting regimes, such as the current project at West
Kilbride Glen, will need to be the cornerstone of NAC’s response to the Biodiversity Strategy
to 2045. They are the platform that all other NAC actions towards halting net nature loss in
North Ayrshire by 2030 and being nature positive by 2045, will be built on.” 
Summary 
This issue has been ongoing for many years with two strong sets of polarised opinion on this
matter. 
The PB exercise demonstrated support for relaxed grass cutting and for wild and native
flowers to be introduced to areas. The Kirkton Glen Meadow Makers had 200 consultees
supporting their proposal and the objectors to this have now delivered a number of letters
against the proposal. 
The proposal is a compromise as it is a pilot, for a lesser piece of land, only the hill area, and
offers a review of its success, or otherwise, at the end of the season. 
Relaxed grass cutting has been established successfully in Stevenston and Lochshore and
the plan is to increase this given the Climate Emergency and competing budget priorities. 
Thomas Reaney
Head of Service (Neighbourhood Services)
21 March 2023
16

Page 17

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    Accounts Commission’s Report: Local Government in
Scotland: Financial Bulletin 2021/22 
Purpose:  To inform the Audit and Scrutiny Committee of the findings of
the recently published report. 
Recommendation:  That the Committee i) notes the findings of the recent Accounts
Commission report, and (ii) notes the current position of North
Ayrshire Council in relation to the findings. 
1. Executive Summary 
1.1 The Accounts Commission published its 2021/22 local government finance bulletin in
January 2023. The report provides a high-level independent analysis of the financial
performance of local authorities during 2021/22 and sets out some of the longer term
financial challenges facing councils. A link to the report is attached below:   
Local Government in Scotland: Finance Bulletin 2021/22 
1.2  The report analyses the annual accounts produced by local authorities, together with
the reports of each body’s external auditors, to identify their relative performance,
highlight the challenges faced and assess their responses to these challenges. The
report has a summary of key findings with more detail provided in two parts; 
• Part 1 - Councils’ financial summary 2021/22; and
• Part 2 - Councils’ financial outlook. 
1.3  Appendix 1 provides Council relevant feedback on each of the key messages
identified. 
2. Background 
General Fund 
2.1 The report provides a high-level independent analysis of the financial performance of
local authorities during 2021/22 and their financial position at the end of that year. It
also sets out some of the longer term financial challenges facing councils. 
Agenda Item 4
17

Page 18

2.2  A summary of the key messages is provided within the report with further information
provided in 2 main sections: 
• Part 1 - Councils’ financial summary 2021/22; and
• Part 2 - Councils’ financial outlook. 
2.3 The key messages for Councils are summarised below: 
• Councils continued to face significant financial challenges during 2021/22 requiring
significant savings to deliver balanced budgets; 
• Councils’ savings performance continued to improve and total usable reserves
increased; 
• Scottish Government revenue funding to councils increased by 5.3% in real terms.
The first real terms increase since 2013/14; 
• 23% of local government funding is either formally ringfenced or provided with the
expectation that it will be spent on specific services, removing local discretion and
flexibility over how these funds can be used; and 
• Covid-19 and inflationary pressures are having an impact on capital projects,
presenting risks to councils’ capital programmes. 
2.4 In addition, the report identifies a number of issues in relation to the outlook for local
government finances, including: 
• The ongoing impacts of Covid-19, inflation and the cost of living crisis means that
councils will need to make increasingly difficult choices on spending priorities and
potential service reductions; and 
• 2/3’s of councils intend to use reserves to help bridge the 2022/23 budget gap.
However, this is not sustainable and recurring savings will be key to ensuring long
term financial sustainability. 
2.5 An update on the position for North Ayrshire Council is noted below: 
• In 2021/22 North Ayrshire Council’s total General Services budget gap was £7.7m,
2.1% of the gross expenditure budget. This was met through a combination of
savings and the use of reserves; 
• Although the majority of savings were delivered during 2021/22, some options,
including a planned reduction in external residential placements for children, were
impacted by the Covid-19 pandemic and were offset by alternative underspends
across the services; 
• Scottish Government revenue funding to North Ayrshire Council increased by 4.8%
in real terms during 2021/22. However, funding on a like for like basis experienced
a (1.6%) reduction; 
18

Page 19

• 22.5% of Scottish Government funding to North Ayrshire Council during 2021/22
was either formally ringfenced or was provided with the expectation that it would be
spent on specific services, including Health and Social Care, Support for Teachers,
Expansion of Early Learning and Childcare, Pupil Equity Funding, Child Bridging
Payments and the Council Tax freeze; 
• Significant cost risks have been identified across the Capital Investment
Programme which are impacting on contractor and material costs across a number
of projects. This has resulted a volatile tendering landscape affecting both delivery
timescales and tender costs.;   
• North Ayrshire Council’s Medium Term Financial Plan has identified key pressures
arising in relation to the legacy impact of the Covid-19 pandemic, high levels of
construction inflation, future pay settlements and other inflationary pressures
including utilities, fuel, food and contractual commitments linked to inflation indices.
The Council’s approach to addressing these financial challenges has been
developed in light of our key priorities, including addressing poverty and the cost of
living crisis, supporting communities and sustainability, and recognises that
investment in areas not aligned to these priorities may need to be reduced in future
years; and 
• North Ayrshire Council’s budget strategy includes the controlled, limited use of
reserves combined with the identification of further recurring sustainable savings to
enable a transition into a more sustainable financial position. In line with this
strategy, no reserves were utilised in achieving a balanced budget for 2022/23. 
3. Proposals 
3.1 It is proposed that the Committee i) notes the findings of the recent Accounts
Commission report, and (ii) notes the current position of North Ayrshire Council in
relation to the findings. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Accounts Commission report highlights the reliance of local government on
Scottish Government grant funding and the need for the development of robust
medium and longer term financial plans to develop sustainable solutions to bridge
anticipated future funding gaps. North Ayrshire Council develops medium term
financial plans on a three year rolling basis and Council has approved a Long Term
Financial Outlook covering the next 10 year period. The financial sustainability of the
Council is monitored regularly and reported to Cabinet throughout the year. 
Human Resources 
4.2 As part of a sustainable financial strategy the Council continues to actively manage the
size of its workforce. Regular communication and consultation takes place with the
workforce and Trade Unions. 
19

Page 20

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Equality impact assessment are carried out for all options identified as part of the
medium and long term financial plans. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 In addressing the financial challenges which it faces, the Council seeks to minimise the
impact on delivering its key priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Executive Directors are consulted in the development of the Medium and Long term
Financial plans and the development of investment and recovery and renewal
strategies. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
None
20

Page 21

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    External Audit Plan 2022/23 
Purpose:  To inform the Committee of the External Audit Plan for 2022/23. 
Recommendation:  That Committee notes the External Audit Plan for 2022/23. 
1. Executive Summary 
1.1 Audit Scotland are the Council’s external auditors for the period 2022/23 to 2027/28,
with 2022/23 being the first year of this appointment. 
1.2  This report provides the Audit and Scrutiny Committee with details of Audit Scotland’s
Annual Audit Plan for the 2022/23 audit. 
1.3  Following completion of the audit, Audit Scotland aims to present the annual audit
report to the Audit and Scrutiny Committee before 30 September 2023. 
2. Background 
2.1 Audit Scotland have been appointed as the Council’s external auditors for the period
2022/23 to 2027/28 with 2022/23 being the first year of this appointment. In addition,
Audit Scotland are the appointed auditors for the North Ayrshire Integration Joint Board
for the same period. 
2.2  Audit Scotland’s Annual Audit Plan for the 2022/23 audit is attached at Appendix 1. A
representative of Audit Scotland will be in attendance to present the plan to the
Committee. 
2.3  In planning the audit work, Audit Scotland has identified key risks in relation to
management override of controls and the valuation of non-current assets and further
audit procedures will be performed to gain assurance over these risks. In addition,
further areas of risk have been identified in relation to pension liabilities and the
accounting for service concession arrangements. Although not considered significant
risks, these areas will be kept under review. 
2.4 In relation to the consideration of the Council’s Group accounts, Audit Scotland have
reviewed the assessments of the group entities and have recommended that North
Ayrshire Leisure Limited should be classified as subsidiary of North Ayrshire Council
and should be consolidated within the 2022/23 Group accounts on that basis. 
Agenda Item 5
21

Page 22

2.5 The Code of Audit Practice sets out four audit dimensions which set a common
framework for all public sector audits in Scotland. Audit Scotland will consider the
adequacy of the arrangements in place in relation to each of these, including: 
• Financial Management – consideration of the arrangements to secure sound
financial management; 
• Financial Sustainability – consideration of the appropriateness of the use of the
going concern basis; 
• Vision, Leadership and Governance – review of the arrangements in place to deliver
the vision, strategy and priorities adopted by the Council; and 
• Use of Resources to Improve Outcomes – consideration of how the Council
demonstrates economy, efficiency and effectiveness. 
2.6  Other responsibilities will include: 
• National Fraud Initiative (NFI) – monitoring of the Council’s progress with investigating
matches identified; and 
• Best Value – assessment over the period of the audit appointment. 
3. Proposals 
3.1 That Committee notes the External Audit Plan for 2022/23. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The fee which will be charged by Audit Scotland for the 2022/23 audit work will be
£356,390. This represents an increase of £39,720 (12.5%) against the 2021/22 fee. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
22

Page 23

Key Priorities 
4.6 The external audit process directly supports the Council Plan 2019 to 2024 through the
maximisation of resources and provision of value for money to support financially
sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Audit Scotland consulted with the Head of Service (Finance) in preparing their audit
plan. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
None
23

Page 24

Prepared for North Ayrshire Council  
March 2023
North Ayrshire
Council
Annual Audit Plan 2022/23 
24

Page 25

North Ayrshire Council Annual Audit Plan 2022/23 | 3
Contents 
Introduction 3
Annual Accounts audit planning 5
Wider Scope and Best Value 13
Reporting arrangements, timetable, and audit fee 14
Other matters 19
Appendix 1. Your audit team 21
25

Page 26

Introduction | 3 
Introduction 
Summary of planned audit work
1.  This document summarises the work plan for our 2022/23 external audit of
North Ayrshire Council (the council). The main elements of our work include:
• evaluation of the key controls within the main accounting systems
• an audit of the annual accounts, and provision of an independent
auditor’s report  
• an audit opinion on other statutory information published within the
annual accounts including the management commentary, the
governance statement, and the remuneration report 
• consideration of arrangements in relation to wider scope areas: financial
management; financial sustainability; vision, leadership, and governance;
and use of resources to improve outcomes 
• consideration of Best Value arrangements
• providing assurance on the Housing Benefit Subsidy Claim, Non-
Domestic Rates Return and the Whole of Government Accounts (WGA)
return
• review the council’s arrangements for preparing and publishing statutory
performance information.
Audit Appointment
2.  We are pleased to be appointed as the external auditor of the council for the
period 2022/23 to 2027/28 inclusive. You can find a brief biography of your audit
team at appendix 1. 
3.  In the first year of the audit appointment, we invest significant time gaining an
understanding of your business and identifying and assessing the risks of
material misstatement to the financial statements. While we use our initial
assessment of risk to inform our planned audit approach, we keep our
assessment of risks under review as the audit progresses. We will inform you of
any significant changes in assessed risks and any resulting changes in our
planned audit work. 
4.  The audit team will actively engage with you over the course of the audit to
ensure our audit work continues to be focused on risk.
26

Page 27

Introduction | 4 
Adding value
5.  We aim to add value to the council through our external audit work by being
constructive and forward looking, by identifying areas for improvement and by
recommending and encouraging good practice. In so doing, we will help the council
promote improved standards of governance, better management and decision
making and more effective use of resources. Additionally, we attend meetings of the
Audit and Scrutiny Committee and actively participate in discussions.
Respective responsibilities of the auditor and the council 
6.  The Code of Audit Practice 2021 sets out in detail the respective responsibilities
of the auditor and the council. Key responsibilities are summarised below. 
Auditor responsibilities
7.  Our responsibilities as independent auditors are established by the Local
Government (Scotland) Act 1973 and the Code of Audit Practice (including
supplementary guidance) and guided by the Financial Reporting Council’s Ethical
Standard. 
8.  Auditors in the public sector give an independent opinion on the financial
statements and other information within the annual accounts. We also review and
report on the arrangements within the council to manage its performance and use
of resources. In doing this, we aim to support improvement and accountability.
The council’s responsibilities
9.  The council is responsible for maintaining accounting records and preparing
annual accounts that give a true and fair view. 
10.  The council has the primary responsibility for ensuring the proper financial
stewardship of public funds, compliance with relevant legislation and establishing
effective arrangements for governance, propriety and regularity that enables it to
successfully deliver its objectives. 
Communication of fraud or suspected fraud
11.  In line with ISA (UK) 240 (The Auditor's Responsibilities Relating to Fraud in
an Audit of Financial Statements), in presenting this plan to the Audit and
Scrutiny Committee we seek confirmation from those charged with governance of
any instances of actual, suspected, or alleged fraud that should be brought to our
attention. During our audit, should members of the council have any such
knowledge or concerns relating to the risk of fraud within it, we invite them to
communicate this to us for our consideration.
27

Page 28

Annual Accounts audit planning | 5 
Annual Accounts audit
planning 
Introduction
12.  The annual accounts are an essential part of demonstrating North Ayrshire
Council’s (the council) stewardship of resources and its performance in the use of
those resources.
13.  We focus our work on the areas of highest risk. As part of our planning
process we prepare a risk assessment highlighting the audit risks relating to each
of the main financial systems relevant to the production of the financial
statements in the annual accounts. 
Materiality
14.  Materiality is an expression of the relative significance of a matter in the
context of the annual accounts. The concept of materiality is applied by auditors
in planning and performing the audit, and in evaluating the effect of any
uncorrected misstatements on the financial statements. We are required to plan
our audit to determine with reasonable confidence whether the annual accounts
are free from material misstatement. The assessment of what is material is a
matter of professional judgement over both the amount and the nature of the
misstatement. 
Materiality levels for the 2022/23 audit of the council and its group
15.  The materiality levels for the council and its group are set out in exhibit 1. 
Exhibit 1
2022/23 materiality levels for the council and its group
Materiality Council Group
Planning materiality: This is the figure we calculate to assess the
overall impact of audit adjustments on the financial statements.
Materiality has been set based on our assessment of the needs of the
users of the financial statements and the nature of the council’s
operations. It has been set at 2% of gross expenditure based on the
latest audited annual accounts for 2021/22. 
£14.98
million
£14.99
million
28

Page 29

Annual Accounts audit planning | 6 
Performance materiality: This acts as a trigger point. If the aggregate
of errors identified during the annual accounts audit exceeds
performance materiality, this would indicate that further audit procedures
should be considered. Using our professional judgement, we have
assessed performance materiality at 70% of planning materiality.
£10.48
million 
£10.49
million
Reporting threshold: We are required to report to those charged with
governance on all unadjusted misstatements more than the ‘reporting
threshold' amount.
£0.25
million 
£0.25
million 
Source: Audit Scotland
Significant risks of material misstatement to the annual
accounts
16.  Our risk assessment draws on our knowledge of the council, its major
transaction streams, key systems of internal control and risk management
processes. It is informed by our discussions with management and internal audit,
attendance at committees and a review of supporting information. 
17.  Audit risk assessment is an iterative and dynamic process. Our assessment of
risks set out in this plan may change as more information and evidence becomes
available during the progress of the audit. Where such changes occur, we will
advise management and where relevant, report them to those charged with
governance.
18.  Based on our risk assessment process, we identified the following significant
risks of material misstatement to the annual accounts. These risks have the
greatest impact on our planned audit procedures. Exhibit 2 summarises the nature
of the risks, the sources of assurance from management arrangements and the
further audit procedures we plan to perform to gain assurance over the risk. 
29

Page 30

Annual Accounts audit planning | 7 
Exhibit 2 
2022/23 significant risks of material misstatement to the annual accounts 
Significant risk of
material misstatement 
Sources of
management
assurance  
Planned audit response
1. Risk of material
misstatement due to
fraud caused by
management override of
controls 
As stated in ISA (UK) 240
(The Auditor's
Responsibilities Relating to
Fraud in an Audit of
Financial Statements),
management is in a unique
position to perpetrate fraud
because of their ability to
override controls that
otherwise appear to be
operating effectively. 
• Owing to the
nature of this
risk, assurances
from
management are
not applicable in
this instance.
• Assess the adequacy of controls in
place for identifying and disclosing
related party relationship and
transactions in the financial statements. 
• Assess the design and implementation
of controls over journal entry
processing.
• Make inquiries of individuals involved in
the financial reporting process about
inappropriate or unusual activity
relating to the processing of journal
entries and other adjustments.
• Test journals at the year-end and post-
closing entries and focus on significant
risk areas. 
• Evaluate significant transactions
outside the normal course of business.
• We will assess any changes to the
methods and underlying assumptions
used to prepare accounting estimates
compared to the prior year.
• Substantive testing of income and
expenditure transactions around the
year-end to confirm they are accounted
for in the correct financial year.
• Focussed testing of accounting
accruals and prepayments.
2. Significant estimation
and judgment: other land
and buildings, council
dwellings and schools
PPP valuations
The council held other land
and buildings, including its
council dwellings and
school PPP estate, with a
net book value of more
than £1,050 million as at
31 March 2022. 
• Revaluations
completed by
Royal Institute of
Chartered
Surveyors
(RICS) qualified
surveyors.
• Revaluations
carried out for all
assets as part of
rolling
revaluation
programme.
• Review the information provided to the
valuer to assess for completeness.
• Evaluate the competence, capabilities,
and objectivity of the professional
valuer.
• Obtain an understanding of
management’s involvement in the
valuation process to assess if
appropriate oversight has occurred.
• Critically evaluate the approach the
council has adopted to assess the risk
that assets not subject to valuation are
30

Page 31

Annual Accounts audit planning | 8 
Significant risk of
material misstatement 
Sources of
management
assurance  
Planned audit response
There is a significant
degree of subjectivity in
the valuation of land and
buildings. Valuations are
based on specialist and
management assumptions
and changes in these can
result in material changes
to valuations.
The assets are revalued
on a five-year rolling basis.
Values may also change
year on year, and it is
important that the council
ensures the financial
statements accurately
reflect the value of the
assets.
Risk: Valuations of these
assets are materially
misstated.
• Detailed working
papers retained
to support asset
reviews and
impairments.
• An annual
impairment
review is
undertaken by
the registered
valuer and
reviewed by
management.
• Documentation
of the S95
officers
consideration of
the processes in
place to confirm
that the year end
valuations are
free form
material
misstatement.
materially misstated and consider the
robustness of that approach.
• Test the reconciliation between the
financial ledger and the asset register.
• Evaluate management’s assessment of
why it considers that the land and
buildings not revalued in 2022/23 are
not materially misstated. We will
critically assess the appropriateness of
any assumptions.
• Critically assess the adequacy of the
council’s disclosures regarding the
assumptions in relation to the valuation
of other land and buildings and council
dwellings.
Source: Audit Scotland
Other area of audit focus 
19.  As part of our assessment of audit risks, we have identified two  other areas
where we consider there is also a risk of material misstatement to the financial
statements. Based on our assessment of the likelihood and magnitude of the risk,
we do not consider this to represent a significant risk. We will keep this area
under review as our audit progresses. 
20.  Other areas of specific audit focus are:
• Pension liability: This is an area of audit focus due to the material value and
significant assumptions used in the calculation of the liability. We will review
the work of the actuary, including reviewing the appropriateness of actuarial
assumptions and management’s assessment of these.
• Service concession arrangements: In February 2023, the council approved
the adoption of the revised accounting arrangements under Local Government
Finance Circular 10/2022 for the recalculation of debt repayments arising from
the council’s service concession contracts aligned to the useful economic life
31

Page 32

Annual Accounts audit planning | 9 
of the assets under the contracts.  The application of financial flexibility on this
basis will result in a retrospective financial benefit to 31 March 2022 of
£21.546 million with an average annual reduction in charges to the General
Fund over the ten-year period to 2031/32 of £3.38 million per year.  We will
confirm that the council has complied with the relevant statutory guidance in
how this accounted for. 
Consideration of the risks of fraud in the recognition of revenue
and expenditure
21.  As set out in ISA (UK) 240 (The Auditor's Responsibilities Relating to Fraud
in an Audit of Financial Statements), there is a presumed risk of fraud over the
recognition of revenue. There is a risk that revenue income may be misstated
resulting in a material misstatement in the financial statements. We have rebutted
this presumed risk in 2022/23 as, while the possibility of fraud exists, we do not
judge it to be a significant risk due to the nature of the majority of the council’s
income streams, namely government funding and grants. 
22.  In line with Practice Note 10 (Audit of financial statements and regularity of
public sector bodies in the United Kingdom), as most public-sector bodies are net
spending bodies, the risk of material misstatement due to fraud related to
expenditure recognition may in some cases be greater than the risk relating to
revenue recognition. We have considered each of the council’s expenditure
streams, and based on our knowledge of the council, prior year considerations
and our risk assessment to date, we do not consider these to be susceptible to
material misstatement due to fraud. We also consider there to be limited
incentive and opportunity for the manipulation of expenditure recognition in the
financial statements. We have therefore rebutted the risk of material
misstatement due to fraud in expenditure recognition for 2022/23.
23.  We have not, therefore, incorporated specific work into our audit plan in
these areas over and above our standard audit procedures. 
Audit of the management commentary, annual governance
statement and remuneration report
24.  In addition to the appointed auditor’s opinion of the financial statements, the
Accounts Commission prescribes that the appointed auditor should provide
opinions as to whether the management commentary, annual governance
statement, and the audited part of the remuneration report, have been compiled
in accordance with the appropriate regulations and frameworks and are
consistent with the financial statements.
25.  To inform these opinions we will consider whether the disclosures within each
statement comply with the requirements of the applicable guidance, and confirm
that relevant information reflects the contents of the financial statements and
other supporting documentation, including:
• Management commentary: Consideration of performance information
reported to council committee’s and published during the year.
32

Page 33

Annual Accounts audit planning | 10 
• Annual governance statement: Reviewing the Local Code of Corporate
Governance, considering the annual assurance statements completed, and
prepared by Senior Officers to provide assurances to the Chief Executive, and
Internal Audit’s annual assurance statement.
• Remuneration report: Obtaining and reviewing payroll data and HR reports. 
26.  Based on our knowledge of the audit, and the established procedures in
place to produce these statements, we have not identified any specific risks to be
communicated to those charged with governance in relation to the audit of the
management commentary, annual governance statement, and audited part of the
remuneration report.
Group Consideration 
27.  As group auditors, we are required under ISA (UK) 600 (Audits of group
financial statements (including the work of component auditors)) to obtain
sufficient appropriate audit evidence on which to base our audit opinion on the
group accounts.
28.  The council has a group which comprises component entities including
subsidiaries, associates, and joint ventures. The audits of the financial
information of some of the components are performed by other auditors. We plan
to place reliance on the work of the component auditors. We will obtain sufficient
appropriate audit evidence in relation to the consolidation process and the
financial information of the components on which to base our group audit opinion.
29.  We have reviewed the assessment of North Ayrshire Leisure Limited’s
(NALL) current classification as an associate based on voting rights and
significance to the North Ayrshire Council Group.  In our opinion NALL should be
fully consolidated into the council’s group accounts as it meets the definition of a
subsidiary.  We will keep this area under review as our audit progresses.
30.  At this stage, it has been assessed that there are no other significant group
components, other than the council and Integration Joint Board (IJB). All non-
significant group components will be covered by an analytical review at the group
level. 
31.  We will obtain sufficient appropriate audit evidence in relation to the
consolidation process and the financial information of the components on which
to base our group audit opinion.
Audit of the trusts registered as Scottish charities 
32.  The 2006 Regulations require charities to prepare annual accounts and
require an accompanying auditor’s report where any legislation requires an audit.
The Local Government (Scotland) Act 1973 specifies the audit requirements for
any trust fund where some or all members of a council are the sole trustees.
Therefore, a full and separate audit and independent auditor’s report is required
for each registered charity where members of the council are sole trustees,
irrespective of the size of the charity.
33

Page 34

Annual Accounts audit planning | 11 
33.  North Ayrshire Council administers eight such registered charities, disclosed
in a single set of annual accounts, with total assets of some £0.660 million. This
is in accordance with the connected charities rules. The preparation and audit of
annual accounts of registered charities is regulated by the Charities and Trustee
Investment (Scotland) Act 2005 and the Charities Accounts (Scotland)
Regulations 2006.
34.  Other than a risk of management override of controls which has also been
identified as risks in respect of the council’s annual accounts, no specific
planning risks were identified in respect of the charity’s annual accounts. 
Materiality levels for the 2022/23 audit of trusts registered as Scottish charities
35.  Materiality levels for the various trusts are set out in exhibit 3.
Exhibit 3
2022/23 materiality levels for trusts registered as Scottish charities
Charitable trust Planning
Materiality
Performance
Materiality
Reporting
Threshold
Anderson Park Trust
(SC042136)
£3
(Based on 2% of
audited 2021/22 net
asset value)
£2
(Based on 75% of
planning materiality)
£1
(Based on 5% of
overall materiality;
£1 minimum)
Douglas Sellers Trust
(SC042101)
£9
(Based on 2% of
audited 2021/22 net
asset value)
£7
(Based on 75% of
planning materiality)
£1 
(Based on 5% of
overall materiality;
£1 minimum)
Margaret Archibald
Bequest (SC042117)
£5,667
(Based on 2% of
audited 2021/22 net
asset value)
£4,258
(Based on 75% of
planning materiality)
£284
(Based on 5% of
overall materiality;
£1 minimum)
North Ayrshire Council
Charitable Trust
(SC025083)
£6,588
(Based on 2% of
audited 2021/22 net
asset value)
£4,941
(Based on 75% of
planning materiality)
£329
(Based on 5% of
overall materiality;
£1 minimum)
North Ayrshire Council
(Dalry) Charitable Trust
(SC043644)
£40
(Based on 2% of
audited 2021/22 net
asset value)
£30
(Based on 75% of
planning materiality)
£2
(Based on 5% of
overall materiality;
£1 minimum)
34

Page 35

Annual Accounts audit planning | 12 
North Ayrshire Council
(Kilbirnie &
Glengarnock) Charitable
Trust (SC043600)
£62 
(Based on 2% of
audited 2021/22 net
asset value)
£47 
(Based on 75% of
planning materiality)
£3
(Based on 5% of
overall materiality;
£1 minimum)
North Ayrshire Council
(Kilwinning) Charitable
Trust (SC043374)
£747
(Based on 2% of
audited 2021/22 net
asset value)
£560
(Based on 75% of
planning materiality)
£37
(Based on 5% of
overall materiality;
£1 minimum)
North Ayrshire Council
(Largs) Charitable Trust
(SC043494)
£68
(Based on 2% of
audited 2021/22 net
asset value)
£51
(Based on 75% of
planning materiality)
£3
(Based on 5% of
overall materiality;
£1 minimum)
Source: Audit Scotland
35

Page 36

Wider Scope and Best Value Audit | 13 
Wider Scope and Best Value Audit 
Introduction
36.  The Code of Audit Practice sets out the four areas that frame the wider scope
of public sector audit. The Code of Audit Practice requires auditors to consider
the adequacy of the arrangements in place for the wider scope areas in audited
bodies.
37.  In summary, the four wider scope areas cover the following:  
• Financial management: means having sound budgetary processes. We
will consider the arrangements to secure sound financial management
including the strength of the financial management culture,
accountability, and arrangements to prevent and detect fraud, error, and
other irregularities. 
• Financial sustainability: as auditors, we consider the appropriateness
of the use of the going concern basis of accounting as part of the annual
audit. We will also comment on financial sustainability in the longer term.
We define this as medium-term (two to five years) and longer-term
(longer than five years). 
• Vision, leadership, and governance: we conclude on the arrangements
in place to deliver the vision, strategy and priorities adopted by the
council. We also consider the effectiveness of the governance
arrangements to support delivery.
• Use of resources to improve outcomes: we will consider how the
council demonstrates economy, efficiency, and effectiveness through the
use of financial and other resources.  
Significant wider scope risks 
38.  Our risk assessment has not identified any significant risks in respect of the
above wider scope areas.
Financial sustainability 
39.  Whilst not a significant audit risk, the challenging financial environment in
which the council, along with other public sector bodies, is operating in, financial
sustainability has been identified as an area of audit focus. There are challenges
to the medium and longer-term financial sustainability due to the uncertainty over
future Scottish Government funding allocations, the rising cost of inflation and the
cost of implementing future pay settlements. Our annual audit report will include
comment on the council’s 2022/23 financial outturn, 2023/24 budget, and its
medium-term financial plan.
36

Page 37

Wider Scope and Best Value Audit | 14 
40.  Our planned work on our wider scope responsibilities is risk based and
proportionate and in addition to local risks we consider challenges which are
impacting the public sector. In 2022/23 we will consider the council’s approach to
tackling climate change.
Climate Change 
41.  Tackling climate change is one of the greatest global challenges. The
Scottish Parliament has set a legally binding target of becoming net zero by 2045
and has interim targets including a 75% reduction in greenhouse gas emissions
by 2030. The public sector in Scotland has a key role to play in ensuring these
targets are met and in adapting to the impacts of climate change. The Auditor
General and Accounts Commission are developing a programme of work on
climate change.
42.  In 2022/23, as part of our Best Value work, we will gather information on the
council’s arrangements for responding to climate change covering areas such as
the development of climate change strategies and the monitoring and reporting of
progress against targets for reducing emissions. 
National Fraud Initiative (NFI)
43.  The council participates in the NFI in Scotland. We will monitor the council’s
progress with investigating the matches identified by this exercise.
Best Value 
44.  Under the 2021 Code of Audit Practice, the audit of Best Value in councils is
fully integrated within our annual audit work. 
45.  Best Value at the council will be assessed comprehensively over the period
of the audit appointment and will include an annual evaluation of the council’s
approach to demonstrating improvement in the effective use of resources and
public performance reporting. We will also follow up findings reported previously
in the council’s 2020 Best Value Assurance Report to assess the pace and depth
of improvement.
46.  In addition to our annual work on Best Value we will conduct thematic
reviews as directed by the Accounts Commission. In 2022/23 our focus will be on
the effectiveness of council leadership in developing new local strategic priorities
following the elections in May 2022. We will issue a separate management report
on this work. 
47.   At least once every five years, the Controller of Audit will report to the
Accounts Commission on the council’s performance in meeting its Best Value
duties. The programme of Controller reports will commence in October 2023. 
Between October 2023 and September 2024 the programme will cover the
councils listed in exhibit 4. 
37

Page 38

Wider Scope and Best Value Audit | 15 
Exhibit 4
2023 Controller of Audit reports 
Falkirk South Ayrshire
Moray Dumfries and Galloway
Clackmannanshire West Dunbartonshire
Orkney Islands City of Dundee
Source: Audit Scotland 
38

Page 39

Reporting arrangements, timetable, and audit fee | 16 
Reporting arrangements,
timetable, and audit fee 
Reporting arrangements 
48.  Audit reporting is the visible output for the annual audit. All annual audit plans
and the outputs, as detailed in exhibit 4, and any other outputs on matters of public
interest will be published on our website: www.audit-scotland.gov.uk. 
49.  Matters arising from our audit will be reported on a timely basis and will include
agreed action plans. Draft management reports will be issued to the relevant
officers to confirm factual accuracy. 
50.  We will provide an independent auditor’s report to North Ayrshire Council (the
council) and the Accounts Commission setting out our opinions on the annual
accounts. We will provide the council and Accounts Commission with an annual
report on the audit containing observations and recommendations on significant
matters which have arisen during the audit. 
51.  Exhibit 5 outlines the target dates for our audit outputs. Exhibit 5
2022/23 Audit outputs
Audit Output Latest date
Annual Audit Plan 31 March 2023
Best Value Management Report 30 September  2023
Independent Auditor's Report 30 September 2023
Annual Audit Report 30 September 2023
Source: Audit Scotland
Timetable
52.  To support an efficient audit, it is critical that the timetable for producing the
annual accounts for audit is achieved. We have included a proposed timetable for
the audit at exhibit 6that has been discussed and agreed with management. 
53.  Covid-19 has had a considerable impact on the conduct and timeliness of the
audit. We recognise that it is in the best interests of public accountability to get the
reporting of audited annual accounts back to pre-pandemic timelines. We are
identifying ways to work more efficiently to expedite the 2022/23 audits whilst at
39

Page 40

Reporting arrangements, timetable, and audit fee | 17 
the same time maintaining high standards of quality.  In 2022/23 we may not meet
the target of concluding the audit and signing the accounts by 30 September, but
we hope to be as close to this as possible.  We are currently planning for an
October completion.
54.  We intend to take a hybrid approach to the 2022/23 audit with a blend of onsite
and remote working. We will continue to work closely with management to identify
the most efficient approach as appropriate and will keep timeframes for the
completion of the audit under review. Progress will be discussed with management
over the course of the audit. 
Exhibit 6
Proposed annual accounts timetable  
Key stage    Provisional Date
Consideration of the unaudited annual accounts by those charged
with governance
21 June 2023
Latest submission date for the receipt of the unaudited accounts with
complete working papers package.
30 June 2023
Latest date for final clearance meeting with the Head of Service
(Finance), agreement of the audited and unsigned annual accounts
and the proposed annual audit report.
To be confirmed
Issue of proposed annual audit report, letter of management
representation and proposed independent auditor’s report to those
charged with governance. 
To be confirmed
Presentation of proposed annual audit report to those charged with
governance.
Approval of the North Ayrshire Council annual accounts by those
charged with governance, independent auditor’s report signed
electronically following this approval and the final annual audit report
issued. 
To be confirmed
Certified Non-Domestic Rates Return, Housing Benefit subsidy claim
and WGA assurance. 
To be confirmed
Source: Audit Scotland 
Audit fee
55.  In determining the audit fee, we have taken account of the risk exposure of the
council and the planned management assurances in place. The agreed audit fee
for 2022/23 is £356,390 (£316,670 in 2021/22).
40

Page 41

Reporting arrangements, timetable, and audit fee | 18 
56.  We have also agreed an audit fee of £1,100 (£1,200 in 2021/22) for the audit
of the registered charities administered by the council.
57.  Our fees have increased in 2022/23 and this reflects the current audit market
and the rising costs in delivering high quality audit work. There are increased
regulatory expectations and risks placed on audit and its quality, as well as a
widening in the scope of work audit must cover.  
58.  In setting the fee for 2022/23 we have assumed that the council has effective
governance arrangements and will prepare comprehensive and accurate annual
accounts for audit in line with the agreed timetable for the audit. The audit fee
assumes there will be no major change in respect of the scope of the audit during
the year and where our audit cannot proceed as planned, a supplementary fee
may be levied. 
41

Page 42

Other matters | 19 
Other matters 
Internal audit
59.  It is the responsibility of the council to establish adequate internal audit
arrangements. The council’s internal audit function is provided by its internal
audit section led by the Senior Manager (Audit, Fraud, Safety & Risk). 
60.  While we are not planning to place formal reliance on the work of internal
audit in 2022/23, we will review internal audit reports and assess the impact of
the findings on our annual accounts and wider scope audit responsibilities. 
Independence and objectivity
61.  Auditors appointed by the Accounts Commission must comply with the Code
of Audit Practice and relevant supporting guidance. When auditing the annual
accounts, auditors must also comply with professional standards issued by the
Financial Reporting Council and those of the professional accountancy bodies.
These standards impose stringent rules to ensure the independence and
objectivity of auditors. 
62.  Audit Scotland has robust arrangements in place to ensure compliance with
these standards including an annual ‘fit and proper’ declaration for all members
of staff. The arrangements are overseen by the Executive Director of Innovation
and Quality, who serves as Audit Scotland’s Ethics Partner.
63.  The appointed auditor for North Ayrshire Council is Fiona Mitchell-Knight,
Audit Director. David Jamieson, Senior Audit Manager is the appointed auditor of
the registered charities administered by the council. Auditing and ethical
standards require the appointed auditor to communicate any relationships that
may affect the independence and objectivity of audit staff. We are not aware of
any such relationships pertaining to the audit of the council or charitable trusts.
Audit Quality 
64.  Quality is at the core of public audit in Scotland and is the foundation for
building consistency and confidence across all audit work. High quality audits
provide assurance, add value, and can support public bodies to achieve their
objectives.
65.  Audit Scotland are committed to delivering high quality audits. The
foundation of our quality framework is our Audit Guide, which incorporates the
application of professional auditing, quality and ethical standards and the Code of
Audit Practice (and supplementary guidance) issued by Audit Scotland and
approved by the Auditor General for Scotland. To ensure that we achieve the
required quality standards, Audit Scotland conducts peer reviews and internal
quality reviews. Additionally, the Institute of Chartered Accountants of England
42

Page 43

Other matters | 20 
and Wales (ICAEW) have been commissioned to carry out external quality
reviews.
66.  As part of our commitment to quality and continuous improvement, Audit
Scotland will periodically seek your views on the quality of our service provision.
We welcome feedback at any time, and this may be directed to the engagement
lead.
43

Page 44

Appendix 1. Your audit team | 21 
Appendix 1. Your audit team 
67.  The core members of the audit team involved in the audit of North Ayrshire
Council are noted below. The audit team will be supplemented by additional staff
during peak times. 
Fiona Mitchell-Knight FCA
Audit Director
FMitchell-Knight@audit-
scotland.gov.uk 
Fiona is the engagement lead for the audit
of North Ayrshire Council and will sign off
the independent auditor’s report on the
council’s annual accounts. Fiona has 30
years’ experience of public sector audit
with Audit Scotland, covering local
government, health, and the further
education sector. 
David Jamieson CPFA
Senior Audit Manager
djamieson@audit-
scotland.gov.uk 
David has over 30 years of public sector
experience and has delivered external
audit services to a range of bodies
including local authorities, health boards
and central government bodies. David will
have overall control of the delivery and
quality of the audit including audit
engagement and ensuring the audit is
properly planned, resourced, and
executed. 
Carol Foster FCA
Senior Auditor
cfoster@audit-scotland.gov.uk 
Carol has considerable experience in
planning and delivering audits. Carol will
lead and be responsible for day-to-day
management of the audit and will be your
primary contact. 
68.  The local audit team is supported by a specialist technical accounting team,
all of whom have considerable experience of public bodies and work with
accounting regulatory bodies. 
44

Page 45

Appendix 1. Your audit team | 22  
North Ayrshire Council
Annual Audit Plan 2022/23 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh  EH3 9DN
Phone: 0131 625 1500  Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
45

Page 46

46

Page 47

NORTH AYRSHIRE COUNCIL 
28th March 2023 
Audit and Scrutiny Committee 
Title:   Council Plan Mid-Year Progress Report 2022-23 
Purpose: To advise the Audit and Scrutiny Committee on progress of our
Council Plan priorities. 
Recommendation:  That the Audit and Scrutiny Committee agrees to: a) Note the
Council Plan Progress Update Mid-Year 2022-23 as set out at
Appendix 1; and b) Note the status of the Council’s performance
indicators and actions at Appendices 2 and 3. 
1. Introduction
1.1. The Council Plan 2019-24 Progress Update (Mid-Year 2022-23) and accompanying
appendices provide detailed information on the progress being made towards our strategic
priority outcomes and includes key activities, areas of focus, case studies and best in class
examples.  It provides an overview of our Council’s performance in the six months up to 30th
September 2022. 
1.2. In addition, as sub-actions conclude in the supporting Council Plan Delivery Plan, the
Council Plan Progress Report at Appendix 1 includes recommendations on replacements
to ensure continuous performance management. 
2. Background
2.1. The Council Plan 2019-24 was approved by Council on 26 June 2019 and sets out our vision
and priorities for the next five years. 
2.2. The Council Plan 2019-24 Progress Update (Mid-Year 2022-23) provides details of our
progress for each of the priorities – Aspiring Communities, Inspiring Place and a Council for
the Future.  The update also provides key highlights, areas of focus, case studies and best
in class examples. 
2.3. In August 2021 the Council Plan Delivery Plan was approved by Cabinet which enabled
actions to be due at dates relating to the activity rather than financial year.   This means
their sub-actions are due to expire at various times throughout the year and replacements
are best captured and approved as part of our Council Plan Progress Reporting.  This report
therefore seeks approval for the replacement of completed sub-actions and amendments of
sub-actions which have been identified as ongoing / longer term. 
Agenda Item 6
47

Page 48

3. Performance Indicators
3.1. Appendix 2 details Performance Indicators from the Council Plan Performance Framework,
showing (where available) a traffic light (Red, Amber, Green) symbol to show whether:  The
target level of performance has been achieved (Green); is slightly adrift of target (Amber);
or is significantly adrift of target (Red).  Analysis of the indicators is outlined in Table 1 below.   
3.2. Where data is not available for Mid-Year 2022-23, the most recently available data up to the
annual figure for 2020-21 is used.  96% of indicators where the status is known are on target
or slightly adrift of target as at 30th September 2022.  This is higher than the same period
last year, when 83.9% of indicators where the status was known were either on or slightly
adrift of target.  However, only 25 indicators have a status available at Mid-Year 2022-23,
compared to 31 the previous year. 
Table 1
Summary of Performance Indicator Status
Traffic Light Mid-Year 
2022-23
Mid-Year 
2021-22      
On target 18 (72%*) 20 (64.5%*)        
Slightly adrift 6 (24%*) 6 (19.4%*)        
Significantly adrift 1 (4%*) 5 (16.1%*)
Status unknown or                        
data only
6 
(19.4% of all
Council Plan
indicators (31))
3 
(8.8% of all
Council Plan
indicators (34)) 
*Of the indicators where status is known 
3.3. As detailed in the Performance Indicator Amendments section below, three performance
indicators are currently not included in the Council Plan as at 30th September 2022. 
3.4. Performance Indicator Amendments
3.4.1. An important element of the Corporate Policy, Performance and Elections Team’s role is to
monitor the robustness of indicators and ensure the framework remains relevant to our
Council Plan priorities.  This ensures we are measuring the correct areas and have the
information we need to make decisions.  As a result, the following areas have been
highlighted. 
3.4.2. CP_01 % of population who are involved in local decision making (as a percentage of
the population) was introduced in 2019 in an attempt to quantify our communities'
participation in decision making.  However, it is not possible to fully exclude potential
duplication and as a result the figures could be misleading.  To ensure our measures are as
accurate as possible we are deactivating this indicator.  Participation is central to our Council
Plan and will continue to be managed through our Council Plan reporting, particularly via
sub action “CP-SUB-04 We will extend and mainstream our participatory approach to offer
communities, including young people, more opportunities to lead in local decision-making”. 
3.4.3. Following the removal of CP_12 Percentage of learning disability service users
accessing employment support activities (as detailed in the Year End Progress Report
and approved by Cabinet), we have identified two replacement indicators that capture our
supported employment activities.  CP_12a Number of unemployed disabled residents
supported and CP_12b Number of unemployed disabled residents supported into
employment will demonstrate the current support that is in place and the results of that
support in terms of enabling residents with additional needs to access employment.  
48

Page 49

3.4.4. As agreed by Cabinet in our 2021-22 Year End Council Plan Progress Update report, we
are currently working with the Health and Social Care Partnership (HSCP) to identify a
replacement for the discontinued indicator CP_13 Percentage of children with BMI
centile >91 at 27 month review.  This will now be detailed in our Year End Progress Update
report. 
3.4.5. CP_29 Overall carbon emissions (tonnes) – Provisional figures for 2021/22 have been
updated following more information being made available.  This has changed the year end
status of 2021/22 reported in our Year End Progress Report from significantly adrift of target
(red) to slightly adrift of target (amber).   
4. Actions
4.1. Appendix 3 details the actions from the Council Plan Delivery Plan.  There are 39 overall
actions within the Council Plan supported by sub-actions.  The status of the sub-actions
informs the overall action status. 
4.2. On 31st August 2021 Cabinet approved a method which ensured any sub-action slightly
adrift (amber) or significantly adrift (red) automatically set the overall action status, with red
taking priority.  However, this approach has led to less important adrift of target sub-actions
skewing the overall results and creating a false impression of performance. 
4.3. It is proposed that officers continue to provide an update on activity for each sub action and
an estimate of the current status (red, amber or green).  Discussions between the Corporate
Policy, Performance and Elections Team and the service, followed by constructive scrutiny
by the Executive Leadership Team, will then inform the status of the overall action. This is
the method used within this report and as a result, we are confident the statuses more
accurately reflect our position than the previous automatic approach.  
4.4. At Mid-Year 94.9% of actions are either on target or slightly adrift of target compared to
100% at Mid-Year 2021-22. 
Table 2
Summary of Overall Action Status
Traffic Light Mid-Year 2022-23 Mid-Year 2021-22   
On target 35 (89.74%) 39 (100%)   
Slightly adrift 2 (5.13%) 0   
Significantly adrift 2 (5.13%) 0 
4.5. The actions significantly adrift of target (red) relate to delays due to external factors.  The
educational estate new build and refurbishment projects are behind schedule due to the
Covid-19 pandemic and global economic factors, however every child entitled to a free
childcare place is currently being provided for (CP_05).  The second action is significantly
adrift as we are awaiting confirmation of funding from the Scottish Government to support
the introduction of Mental Health Practitioners in GP practices (CP_16). 
49

Page 50

4.6. Action Amendments
4.6.1. To ensure transparency, where the Corporate Policy, Performance and Elections Team in
partnership with services feel an alteration to an action may result in more effective
performance management, these recommendations are listed within Appendix 1 in detail. 
In summary, they relate to the following actions / sub-actions: 
• CP_06 - We will support our children and young people to become successful
learners, confident individuals, effective contributors and responsible citizens – New
proposed sub-actions sourced from Education Services Plan to replace completed sub-
actions.
• CP_07 - We will offer opportunities to our young people and their families to play a
more active role in school life and encourage more participation in learning
opportunities – New proposed sub-actions sourced from Education Services Plan to
replace completed sub-actions.
• CP_08 - We will work with our young people to build their resilience, supporting their
mental and physical wellbeing – New proposed sub-actions sourced from Education
Services Plan to replace completed sub-actions.
• CP_09 - We will work with schools, colleges, universities, businesses and partners to
deliver education, skills and training, helping people into work and sustaining
employment – New proposed sub-actions sourced from Education Services Plan to replace
completed sub-actions.
• CP_10 - We will make sure that everyone has the ability and knowledge to participate
in the digital world – New proposed sub-actions sourced from Education Services Plan to
replace completed sub-actions.
• CP-SUB-32 - Grow Care at Home Capacity – This is an ongoing action, therefore it is
proposed the end date is extended from 31st March 2022 to 31st March 2024. 
• CP-SUB-33 - Prioritise Day Services Model and Support for Carers – This is a longer
term action, therefore it is proposed the end date is extended from 31st March 2022 to 31st
March 2023. 
• CP-SUB-34 - Prioritise integrated island services, including unscheduled care –
Expected developments in this area mean extending this action from 31st March 2022 to
31st March 2023 will enable us to capture performance more effectively. 
• CP-SUB-35a - We will help individuals to have better choice and control of their
support at an early stage by reinvigorating Self-Directed Support – Following the
establishment of A Self-Directed Support (SDS) Learning Review Board in June 2022 and
resulting change in scope for this action, it is proposed this sub-action is extended from 31st
March 2022 to 31st March 2023. 
• CP-SUB-37 - We will work with Scottish Government as a trailblazer site for the whole
systems approach to diet and healthy weight (public health priority) – This work was
paused due to the involvement of Public Health partners in the pandemic and resulting
secondment of partners to other roles.  However, it has recently recommenced and we now
have a better understanding of the expected due date.  It is proposed this sub-action is
extended from 31st March 2022 to 31st March 2024. 
• CP-SUB-38 - Prioritisation of children and young people receiving support from Child
and Adolescent Mental Health Services – Expected developments including opportunities
to host services at West Road, Irvine, mean extending this sub-action’s due date form 31st
March 2022 to 30th September 2023 will better reflect performance. 
• CP-SUB-39 - Prioritise community mental health services supporting people within
their communities – This is an ongoing action, therefore it is proposed the end date is
extended from 31st March 2022 to 31st March 2024. 
• CP-SUB-42 Work closely with colleagues in Acute Services and Police Scotland to
address the levels of unscheduled care in mental health – It is proposed the end date is
extended from 31st March 2022 to 30th September 2023 to reflect the opening for the new
mental health hub at Woodland View, Irvine in the spring.
50

Page 51

5. Proposals 
5.1 That the Audit and Scrutiny Committee agrees to: a) Note the Council Plan Progress Update
Mid-Year 2022-23 as set out at Appendix 1; and b) Note the status of the Council’s performance
indicators and actions at Appendices 2 and 3. 
6. Implications/Socio-economic Duty 
Financial 
6.1. There are no financial implications. 
Human Resources 
6.2. There are no human resource implications. 
Legal 
6.3. This report confirms the arrangements for the Council’s compliance with its duties
under the Local Government Act 1992 and the Local Government in Scotland Act
2003 and commitment to improving public performance reporting. 
Equality/Socio-economic 
6.4. There are no equality/socio-economic implications. 
Environmental and Sustainability 
6.5. There are no environmental and sustainability implications. 
Key Priorities 
6.6. This report helps to demonstrate the Council’s delivery of its strategic priorities. 
Community Wealth Building 
6.7. There are no community wealth building implications. 
7. Consultation 
7.1. Feedback from the Executive Leadership Team (ELT) informed the content of this
report. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Team Manager (Policy and
Performance), email: IslaHardy@North-Ayrshire.gov.uk. 
Background Papers
Council Plan 2019-24
51

Page 52

Council Plan 2019-24 Progress Update
Mid-Year 2022-23 
Appendix 1
52

Page 53

Contents 
Our Performance at a Glance ............................................................................................. 1
Welcome ........................................................................................................................... 2 
Aspiring Communities - Key Activities ................................................................................ 3
Aspiring Communities – Case Study ................................................................................... 9
Aspiring Communities – Areas of Focus ............................................................................ 10 
Inspiring Place – Key Activities ......................................................................................... 11
Inspiring Place – Case Study ............................................................................................. 14
Inspiring Place - Areas of Focus  ....................................................................................... 15 
A Council for the Future – Key Activities ........................................................................... 16
A Council for the Future - Areas of Focus .......................................................................... 17 
Performance Summary .................................................................................................... 18
Best In Class .................................................................................................................... 27
What Our Customers Say ................................................................................................. 28 
The Corporate Policy, Performance and Elections Team welcome any feedback you may have.  We strive to make
our Council and reports as accessible as possible and appreciate opportunities to discuss how this can be achieved. 
For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 324648 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
53

Page 54

Page 1 of 43 
38 Modern
Apprentices
recruited to our
Council, of which 7
(18%) are care
experienced or
have a disability 
25 Community
Wishes delivered
through
procurement
contracts
16,050 
new trees 
planted
We established
our Child
Poverty and
Cost of Living 
Board
We launched our
Energy Smart
Programme
totalling £2.176m
of support to
vulnerable
households
£500,000 
allocated to 
help with basic
food provision
58% of lower value
procurement
contracts (Quick
Quotes) awarded to
local businesses
170 of our
Young People
attended our
Cost of the
School Day
Conference
Our Performance at a Glance 
£4.074m
allocated to
support families
with the cost of
living
Ayrshire Growth Deal
Community Wealth
Building project 
officially launched with
120 stakeholders in
attendance
We currently have 
2,603 tenants
on our Tenant
Panel 
16,378 
Free Bus Travel
Passes issued to
those under 22 years
54

Page 55

Page 2 of 43 
Welcome 
Though the first six months of 2022/23 have seen us return to a more normal way of life in terms of
Covid-19 restrictions, challenges relating to the cost of living are being felt by our communities across
North Ayrshire.  The increased cost of living is affecting all of our residents particularly our most
vulnerable.  We understand that as we try to recover from the impact of the Covid-19 coronavirus
pandemic, the impact of rising fuel and food costs is particularly challenging both financially as well
as for our mental health.  Tackling child poverty and the cost of living crisis is therefore an immediate
priority for our Council.  If you are in need of assistance, please visit www.north-ayrshire.gov.uk/cost-
of-living or call 01294 310000.
Throughout this update we provide information on how we are addressing immediate and longer
term needs in our communities.  Our ‘Tackling Child Poverty and the Cost of Living’ case study details
over £6.2million of support including £2.54million from the Scottish Government Covid Recovery
Fund and £4.074million from our Council budget.  This is already reaching local families, ranging
from £100 additional bridging payments for our eligible families, through to innovative energy
supports and food networks led by our community partners.  Our recently established Tackling Child
Poverty and Cost of Living Board, chaired by the Leader of our Council and supported by our
Community Planning Partners, will oversee our approach to ensure it is as effective as possible for
the people of North Ayrshire.  The way we are responding is attracting attention from other local
authorities across Scotland and our focus continues to be on improving the lives of the people we
serve - ensuring we achieve a North Ayrshire that is Fair For All. 
Our Vision
A North Ayrshire that is ‘Fair for All’ 
Our Mission
Working together to improve well-being, prosperity 
and equity in North Ayrshire 
Our Priorities
Aspiring Communities 
♦ Active and strong
communities 
♦ Children and young people
experience the best start in
life
♦ Inclusive, growing and
enterprising local economy 
♦ Residents and communities
enjoy life-long health and
well-being
♦ Residents and Communities
are safe
Inspiring Place 
♦ Well connected with
effective infrastructure 
♦ Homes the meet residents’
needs 
♦ Vibrant, welcoming and
attractive environment 
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that
puts residents and
communities at the heart of
what we do 
♦ An efficient Council that
maximises resources and
provides value for money
♦ A valued workforce that
delivers high quality services 
♦ A powerful and respected
voice
55

Page 56

Page 3 of 28 
Aspiring Communities - Key
Activities 
Active and Strong Communities 
Community Investment Fund
Cabinet approved £48,586 of the Community
Investment Fund for Ardrossan Community
Association (ACA) to support local residents address
the cost of living crisis.  Working alongside the Three
Towns Locality Partnership, the Health and Social Care
Partnership (HSCP) and other partners, they increase
access to food with dignity through Ardrossan
Community Centre, support wellbeing and help our
residents access employment.   
Beith Trust has received £15,812 from the Community
Investment fund to explore improvements at
Geilsland Estate.  The funding will be used to examine
the community space and provide Beith Trust with the
information to secure capital funding and take the
project to the next stage.  Entitled the ‘Courtyard
Project’, the aim is to ensure better, more energy
efficient community spaces for local groups who have
outgrown their current locations.  Beith Trust is also
planning to make the space more energy efficient by
investing in green technology.   
Island Plans 
Delivery Groups have been formed to achieve the
goals of the Isle of Cumbrae Local Island Plan and the
Arran Island Plan.  The Delivery Groups, consisting of
local residents, will play a key role in actioning the
plans as well as monitoring and reporting on their
progress.  Our Council worked closely with our
residents, Scottish Government and Highlands and
Islands Enterprise to establish the two 10-year Island
Plans covering Arran and the Isle of Cumbrae
respectively.  The plans address long-term issues
facing both islands and look to support the
community alongside the economic and
environmental wellbeing of our islands.   
Locality Partnerships
Community representatives have been recruited for
the refreshed Locality Partnerships following the
recent Local Government Elections.  ‘Getting to Know
You’ and action planning sessions are taking place to
bring together new Chairs, community
representatives and partners to consider and plan
how to best address priorities in each locality.
Tenant Participation
After meeting digitally through the pandemic, five of
our Tenant Residents groups are now meeting in-
person – the North Ayrshire Network, Inspection
Panel and Service Improvement continue to meet
online.  Consultation for the Tenant Participation
Strategy 2022 – 2027 is now complete and we were
awarded Gold Level re-accreditation in July 2022 by
the Tenant Participation Advisory Service Scotland
(TPAS) for our approach to customer engagement,
analysis of services and digital engagement.  Bronze,
silver, or gold accreditation is awarded to
organisations based on how well they engage with
tenants and is nationally recognised.  As at September
2022, we have 2,603 tenants on the Tenant Panel. 
Participatory Budgeting
Meetings were held with the successful 2022 Arts and
Culture Participatory Budgeting (PB) applicants to
provide support with their projects and help raise
their profile within North Ayrshire.  The support has
been beneficial and has resulted in new projects and
partnerships being formed.   
Community Hubs
To strengthen the Community Hub model, 14 sites
across North Ayrshire now have community larders
embedded within community facilities.  Supported by
the Fairer Food Network and community partners, the
larders were born during the pandemic with the goal
of ensuring access to good food with dignity.  Food
poverty has been heightened by the recent cost of
living crisis and the larders provide a dignified way for
our people who are struggling to afford their weekly
shop to source essential items.  The volunteers
assisting at the larders are able to provide our
residents in need with information about other
services which may be valuable, such as financial
advice and support.   
In May 2022, we reviewed our larders, considering
what we learned from the resilience hubs during the
pandemic.  The feedback from the review was very
positive but further highlighted the need to ensure
the network is as sustainable as possible especially
due to the cost of living.
56

Page 57

Page 4 of 28 
Community Asset Transfer
After a successful community asset transfer,
Thornhouse Avenue Tennis Courts are now owned
and fully utilised by Irvine Tennis Club.  The tennis
courts have been established for 70 years however
they needed upgrading.  Thanks to the Community
Asset Transfer, the Club can now attract external
funding to further develop the courts and create
opportunities for the local community - floodlights
and a clubhouse will be installed and the courts will be
brought up to competition standard. 
Children and Young People experience the
best start in life 
Education Standards and Quality Report 
September saw the release of our Education Service
Standards and Quality Report.  This report details
progress made towards our Service Improvement Plan
priorities from session 2021-22.  These priorities were
as follows: 
♦ Priority 1 – We will create the conditions for our
children and young people to access the highest
quality learning experiences from ages 3-18.
♦ Priority 2 – We will support our children and
young people to become successful learners,
confident individuals, effective contributors and
responsible citizens
♦ Priority 3 – We will offer opportunities to our
young people and their families to play a more
active role in school life and encourage more
participation in
learning.
♦ Priority 4 – We will
work with all young
people to build their
resilience supporting
their mental health and
physical wellbeing. 
Attainment
We have continued to make
good progress in our efforts
to reduce the poverty
related attainment gap and
inequality in schools. 
Strategic and operational
planning took place in
response to the Scottish
Government's publication
of a revised framework for recovery and accelerating
the Scottish Attainment Challenge in March 2022.   
A collaborative event with school leaders took place in
May to inform next steps.  Approximately 80
participants from our Education Service came
together to address progress so far and agree future
areas of focus.  For the 2022/23 academic year these
include:
♦ A review of professional learning.
♦ Embedding whole school nurture.
♦ Enhancing data literacy skills across the service. 
Our efforts to improve early learning and childcare
and the roll out of 1140 hours of childcare across
North Ayrshire have resulted in an increase in the
percentage of children reaching their early years
milestones by Primary One for 2022, bringing overall
performance back to pre-pandemic levels.  Our latest
data from 2022 indicates we had slightly more
children achieving their overall milestones than any
other year recorded. 
North Ayrshire’s Family Learning Team continues to
offer all schools across our local authority an
extensive programme of interventions, which focus on
enhancing family engagement during their child’s time
at school.  The Family Learning Team engaged with
1,013 families during 2021-22, with families
participating in 25 different interventions.
57

Page 58

Page 5 of 28 
Supporting Needs Review
Our Education Service led Supporting Needs Review
Board continues to take forward recommendations
outlined in the Morgan Review of Additional Support
for Learning.  Our work locally focuses on three key
areas, which are:  How we use our resources;
enhancement of universal and targeted services; and
streamlining systems and processes to ensure equity. 
One recent improvement has been the roll out of
Secondary Support Resources across all nine
secondary schools.  This model provides enhanced
support to our young people within their own school
community through inclusive and personalised
learning experiences. 
Cost of the School Day
Our Reducing the Cost of the School Day (COSD)
Conference was held in May and attended by 170 of
our young people, alongside parents, our employees,
Elected Members and Community Planning partners. 
The aim of the conference was to shape the next
steps in the COSD action plan through working with
our residents most closely affected by the cost of the
school day. 
Our Council’s commitment to nurture an equal society
where children and young people experience the best
start in life ensured the conference provided a
platform for our children and young people to voice
their experiences and those of their community.  It
also gave an opportunity for our young people to have
their say in prioritising spending on areas such as:
♦ School transport costs.
♦ Residential / general trips.
♦ Access to digital devices and Wi-Fi.
♦ Stationery.
♦ Access to healthy food during weekends and
holidays.
♦ Clothing. 
Free School Holiday Meals
We provided free holiday school meals during the
Easter and summer holidays for our children and
young people entitled to free school meals.  The
Holiday School Meals Programme was established for
those who are eligible for free school meals based on
low income, however, no child was turned away if
they wanted to participate and enjoy a lunch with
friends.  The programme was delivered by our
community partners including community centres and
KA Leisure.  The programme also provided low-
income families with a £10 grocery shopping voucher
per child per week when free meals couldn’t be
delivered.  The programme was very successful during
the summer break, with over 16,000 meals being
prepared and delivered.   
Free Bus Travel Scheme
With the introduction of the free bus travel scheme
for 5 to 21 year-olds living in Scotland, our schools and
Customer Services Team have supported families to
complete the application process for a National
Entitlement Card (NEC) or a Young Scot Card.  The
scheme aims to help our young people save money
while travelling more sustainably.  Applying through
our schools eliminates the need for an ID check
(required when applying directly for an NEC).  As at
September 2022, 16,378 of our children and young
people had applied for a travel card. 
Inclusive, growing, and enterprising local
economy
An Inclusive Economy  
The Ayrshire Growth Deal Community Wealth Building
(AGD CWB) programme was officially launched at an
online event in June with 120 attendees.  One-to-one
sessions, CWB focussed workshops and financial
assistance has been provided through local
enterprises recently and so far, the programme has
achieved the following goals: 
♦ 501 local enterprises supported.
♦ 101 local businesses are registered on Public
Contracts Scotland (a national website used to
advertise public sector procurement
opportunities).
♦ 107 local businesses attended procurement
workshops
♦ 156 local businesses accessed one-to-one
procurement support / consultancy.
♦ 16 local businesses attended 'fair work' related
workshops. 
To support the AGD CWB programme throughout
Ayrshire, two videos have been created and are
58

Page 59

Page 6 of 28 
available to view on YouTube, explaining the approach
and the impact on our young people.   
As a key organisation, Police Scotland signed the
Ayrshire Community Wealth Building Anchor Charter
in June 2022.  A total of 11 organisations have now
signed the Charter.   
Procurement
As part of our ongoing “Community Benefits Wishlist”
where community groups can request donations or
time from local suppliers, 25 wishes have been fully
delivered since the list was launched in October 2021
(11 wishes delivered since 1 April 2022).  Community
Groups can register ‘wishes’ for their communities via
the online Wishlist Portal.  As at September 2022,
there are: 
♦ 61 groups registered on the list.
♦ 123 wishes.
♦ 13 wishes in discussion.
Support given so far has included:
♦ Donations of garden equipment to West Kilbride
Community Sport Group.
♦ A donation towards new sports equipment at
Millport Town Hall.
♦ Food donations to Cranberry Moss Community
Larder in Kilwinning.
♦ A refresh of the car park and Easter Trail at
Fullarton Connexions.
♦ A roof survey of Barrmill Community Centre.
♦ Donation of an eight-yard skip of compost from
Lowmac to Eglinton Community Garden.
♦ Donation of time and materials to renovate the
dining area at Mungo Foundation by Muir Group.
♦ Donation of £250 from GMC Corsehill to
Pennyburn Community Association.   
We have revised our Quick Quote procurement
process to make it more accessible for local
businesses.  Quick Quotes are more straightforward
and less labour intensive to complete than tenders, so
will encourage our local businesses to quote to supply
goods, services and works to our Council.  As a result
of the Quick Quote process, the value of locally
awarded Quick Quotes has already increased by 21%
compared to last year with 58% of Quick Quotes being
awarded locally.   
Fair Work
Our Pan-Ayrshire Fair Work Ayrshire Team is fully
operational and has achieved the following this year:
♦ Engaged with 141 businesses.  
♦ Conducted 78 initial meetings and developed 78
action plans.  
♦ 31 Ayrshire businesses have been referred for
secure living wage accreditation.
♦ 34 Ayrshire businesses have been referred for
secure disability confident accreditation 
♦ 8 Ayrshire businesses have been signposted to
create Modern Apprenticeship opportunities 
Key Fair Work Ayrshire activities in the past six
months include: 
♦ Action planning with NHS Ayrshire and Arran,
North Ayrshire Health and Social Care Partnership,
Police Scotland, KA Leisure and Ayrshire College.  
♦ Supporting the North Ayrshire Job Fair and
promoting Fair Work to 30 businesses attending
and over 400 North Ayrshire residents.
♦ Working with Ayrshire College and key
stakeholders across Ayrshire to address gender
balance on particular courses and sectors e.g.,
care, construction, hair and beauty.  
♦ Delivering a Fair Work Workshop for employers in
partnership with Business Gateway.  
♦ Supporting our Health and Social Care Partnership
to deliver Fair Work support to care sector
providers. 
Developing the Young Workforce
To support pupils in the senior phase (S4-S6) of
secondary schools, we have recruited Developing the
Young Workforce (DYW) Coordinators.  DYW
Coordinators work collaboratively with a range of
post-school agencies, employers and internal services
to support all our school leavers to move into
education, training or employment.  Feedback from
schools indicates our DYW Coordinators are having a
positive impact in supporting learners.  
We have recruited 38 Modern Apprentices, of whom
seven of our new colleagues have a disability or are
care experienced young people.   
59

Page 60

Page 7 of 28 
Residents and communities, enjoy good, life-
long health and wellbeing 
In June our Cabinet approved the allocation of
£2.154m of Scottish Government Covid Recovery
Fund for a range of support to low-income households
and measures to stimulate our local economic
recovery.  In August £2.348m was approved to further
support our residents.  This is detailed in our case
study below. 
Better Off Programme (BONA)
This project delivers financial advice services,
adopting a person centred, holistic approach, through
a Public Social Partnership (PSP).  We have been
piloting the approach in the Three Towns (Ardrossan,
Saltcoats and Stevenston) and Arran to help deliver
our Better Off programme.  This is a voluntary
partnership between organisations from the public
and third sector which provides access to a range of
advice services.  The pilot will run until March 2023
and the PSP is currently being delivered by: 
♦ Community Housing Advocacy Project (CHAP) – a
charitable organisation offering financial advice.
♦ Citrus Energy – a social enterprise offering energy
efficiency advice and advocacy services, such as
fuel switching (once the market allows for this
again in the future) and debt management.  
♦ Our Money Matters Team.   
Community Care
Day Services have reopened in all the localities on the
mainland.  Although operating at a reduced capacity
due to recruitment needs, Day Services are providing
building-based services and outreach provision based
on priority to residents.  The service continues to
liaise with Alzheimer’s Scotland who recommenced
Day Services in 2021.   
Our Community Space was launched in May in Dalry,
Beith and Kilbirnie.  Our Community Space provides a
relaxed and informal social environment for residents. 
Teams are available to provide information and advice
including representatives from Turning Point -
Scotland’s Prevention, Early Intervention and
Recovery Service. 
Mental Health and Wellbeing Support
The new ‘See Me See Change’ approach to addressing
mental health in schools has been piloted by nine
secondary schools across North Ayrshire:
♦ St Matthews Academy, Saltcoats
♦ Arran High School
♦ Garnock Campus
♦ Ardrossan Academy
♦ Kilwinning Academy
♦ Irvine Royal Academy
♦ Auchenharvie Academy
♦ Largs Academy 
The approach is designed to break down barriers,
encourage open communication about mental health
and address stigma.  103 pupils and 25 employees
attended training sessions where they also provided
feedback to See Me staff on how the materials could
be used or adapted to benefit schools.  Our pupils and
school teams then collaborated on action plans for
their own schools. 
As part of Mental Health Awareness Week in May
community events were run in Irvine and Springside
with the aim of raising awareness and tackling
loneliness.  The events were established in
partnership with North Ayrshire Community Link
Workers, the Green Health Partnership, Irvine
Community Development Teams, KA Leisure, Impact
Arts, Children 1st and the Harbour Arts Centre. 
Work is continuing on a new Mental Health Hub due
to open by March 2023 within Woodland View,
Irvine.   The new assessment hub will be the first of its
kind in Scotland, providing unscheduled care
assessment for up to 72 hours. 
Our Mental Health and Wellbeing Delivery Officers
work to support young people aged 5-25 years with
their wellbeing, resilience and mental health through
a number of projects, events, activities and group
work sessions including: 
• Suicide Prevention Work.
• Family based Mental Health and Wellbeing
learning workshops.
• Targeted work around LGBT.
• Partnership working with Employability and
Ayrshire College.
60

Page 61

Page 8 of 28 
• Your Resilience eight-week programme. 
• Be-lnn Unity Accredited Training.
• Bee You Ambassadors and Mini Ambassadors. 
• Take Time Campaign. 
The team has been working across schools and
communities with strong partnerships with Education,
Family Learning, Police Scotland, Mental Health UK
and Be-Inn Unity.  Supporting family-based work,
ambassador programmes, peer mentoring and a
comprehensive mapping exercise, our youth-based
group work is accredited with SQA Qualifications and
Bounce Back Awards.  (Bounce Back is a multiple
award-winning approach to wellbeing, resilience and
social-emotional learning for primary school children).   
We delivered a Pedal Irvine event on 8th May in
association with Cycling Scotland and the Ayrshire
Community Trust (TACT).  This family event was free,
provided Dr Bike sessions to check equipment before
beginning the 6.2mile course and gave the
opportunity for some residents without a bike to
borrow one at no cost.  Over 300 people took part. 
Residents and communities are safe
Energy Support 
We are collaborating with the Energy Agency to assist
our residents with the financial challenges faced due
to the rising cost of energy over the coming months. 
The Energy Agency provides free advice on reducing
energy consumption and promoting sustainability to
help residents lower their energy bills.  Our Energy
Smart Scheme was allocated £1.726m in our 2022/23
budget, with an additional £450,000 approved in
August.   This offers:
♦ A dedicated helpline for energy efficiency and
other low carbon advice.
♦ The delivery of energy efficiency measures in
peoples’ homes to improve the affordability of
energy in homes across North Ayrshire.
♦ A £450,000 Emergency Support element to
provide direct payments to low income families
struggling to pay their energy bills. 
To support this, our Council are providing financial
assistance in the form of crisis payments to those in
most need. 
Our Homelessness and Community Safety Team
created four new posts to address income
maximisation and help reduce fuel poverty for Council
tenants.  These officers help tenants to reconnect
meters, address tenants’ debt and find sustainable
ways to pay their bills going forward.  A further two
Housing Officers will help maximise the uptake of
benefits for our residents living in Sheltered
Accommodation.  Our aim is to ensure all residents
can more easily heat their homes and includes Winter
Warm initiatives and interventions.   
Homelessness
We continue to implement our ‘Housing First’
approach in the provision of homelessness services. 
Since April, 18 Housing First tenancies out of a target
of 20 for the year have been created.  Working across
the Community Planning Partnership, the aim of
Housing First tenancies is to break the cycle of
homelessness for those suffering from addiction or
mental health problems, or for residents who present
offending behaviour.  The Housing First tenancy
sustainment success rate is as follows:
♦ Year 1 (2019/2020) 67%
♦ Year 2 (2020/2021) 91%
♦ Year 3 (2021/2022) 92% 
Community Safety
With the warmer weather over the summer, our
Streetscene team assessed all areas of open water
across North Ayrshire under our responsibility and
installed new safety equipment and signage.  Our
Water Safety Policy was updated and partner
organisations encouraged to promote water safety.   
The Ayrshire Safer Shores Campaign 2022 was
launched ahead of HM The Queen’s Platinum Jubilee
holiday this summer.  Working alongside partners
including NHS Ayrshire and Arran, Abellio Scotrail and
the British Transport Police, it aimed to maximise
public safety and people’s enjoyment of our shores
without the worry of antisocial behaviour or alcohol
related incidents.
61

Page 62

Page 9 of 28 
Aspiring Communities – Case Study
Tackling Child Poverty and the Cost of Living 
Tackling child poverty and the current cost of living
crisis is an immediate priority.  We have established a
new Child Poverty and Cost of Living Board, chaired by
the Leader of our Council and supported by our
Community Planning Partners.   The aim of the board is
to provide leadership in the development and delivery
of our Child Poverty Action Plan and our approach to
addressing the cost of living.   
Ensuring the voices of our residents are heard
underpins the work of the Board.  We have already
hosted a mini-public enquiry with a range of partner
organisations and residents from across North Ayrshire. 
Part of a rolling programme, the initial theme was to
identify ways of improving access to public services and
vital support through discussing ways to achieve a ‘No
Wrong Door’ approach – ensuring residents are
supported to access advice no matter how they contact
our Council or our partners.  The Board will continue to
have conversations with residents on themes such as
employability, food and childcare in the coming weeks.  
These important discussions will help to inform our Child Poverty Strategy 2023-26. 
In June, our Cabinet approved the allocation of £2.154m of the Scottish Government Covid Recovery Fund, to
provide a range of support to low-income households and measures to stimulate local economic recovery.  This
includes immediate support such as a £100 top up to the existing £130 Summer, October and December Child
Bridging Payments and is extended to families with children of pre-school age.  Approximately 3,300 families in
North Ayrshire (5,700 children) will be eligible to receive this support.  In addition, a public transport travel scheme
to support travel to work, support for the delivery of our Modern Apprentice programme, new Skills for Life work
placements, employer recruitment incentives and a Digital Growth Fund to assist local businesses will be funded. 
In August 2022, our Cabinet approved an investment of £2.348m in addition to the £1.726m already secured through
the 2022/23 budget for an Energy Smart Scheme Investment - a total of £4.074m to help our families with the cost
of living.  The Energy Smart Scheme will offer advice and support to help residents lower their energy bills, as well as
practical help to install energy-saving features in homes.  This support will be directed to our residents most in need.   
The approved funding in August also includes £500,000 to strengthen our existing community food network and
ensure essential food provision is available to anyone who requires this support.  These actions demonstrate our
commitment to creating a fairer and more equitable society in North Ayrshire.  
62

Page 63

Page 10 of 28 
Aspiring Communities – Areas of
Focus
Active and strong communities
♦ We will continue to tackle child poverty and the
cost of living by identifying immediate and
medium-term actions through community
workshops and mini enquiries.  
♦ We will continue to support our Fairer Food
Network, including our 14 community larders.
♦ We will develop our new Tenant Participation
Strategy 2022-2027.  
♦ We will refurbish Dreghorn and Fairlie libraries in
order to accommodate community partners,
strengthening our community hub approach. 
Children and young people experience the
best start in life 
♦ We will implement and embed our new learning,
teaching and assessment framework to maximise
the quality of educational experience for all
learners.
♦ We will develop a three-year Raising Attainment
Strategy to improve outcomes for all learners and
reduce inequity of outcomes, including a focus on
accelerating progress in the early stages of
primary and early learning settings.  
♦ We will implement our redesigned targeted
approaches to reducing the poverty-related
attainment gap. 
♦ We will refresh our supports and provision to
promote good mental health and wellbeing in our
children and young people.
♦ We will establish an enhanced range of flexible
child centred learning provisions, curriculum
options and delivery methods that support a wide
variety of needs.
♦ We will co-create with our children and young
people new ways to maximise learner
participation and voice.
♦ We will continue to actively progress and monitor
education new builds and refurbishments. 
Inclusive, growing, and enterprising economy 
♦ We will implement the Ayrshire Skills Investment
plan across Ayrshire to ensure the skills of our
residents meet the needs of local businesses in
order to support access to good quality jobs.  
♦ We will support digitally excluded residents
through our community hubs and spaces.  
♦ Through our new ‘Quick Quote’ process, we will
encourage more local small and medium
enterprises to apply for our supplier contracts,
further supporting Community Wealth Building.
♦ We will develop an Ayrshire Regional Economic
Strategy focussed on Community Wealth Building. 
Residents and communities, enjoy good, life-
long health and wellbeing 
♦ We will continue to deliver a combination of day
services and outreach provision.  
♦ We will continue to collaborate with North
Ayrshire Health and Social Care Partnership, NHS
Ayrshire and Arran, Third Sector Interface (TSI)
North Ayrshire and Scottish Care to instil the
foundations of ‘The Promise’ in North Ayrshire.
♦ We will review the way we offer period products
to ensure they are meeting the needs of our
communities. 
Residents and communities are safe 
♦ We will open our new Mental Health Hub,
Woodland View, Irvine, early in 2023.  
♦ We will continue to create Housing First tenancies
in order to alleviate homelessness and provide
settled accommodation for our residents as soon
as possible. 
63

Page 64

Page 11 of 28 
Inspiring Place – Key Activities
Well connected with effective Infrastructure
Lochshore
Completed at the end of summer, we are preparing to
open our Lochshore Park Hub on 4th October.  The
Hub will open with a free family fun day with activities
for people of all ages to take part in.  Our Active Travel
connection linking Lochshore Park to the National
Cycle Network (NCN7) is also complete with some
additional landscaping works to follow.  We began
construction on our 5km leisure route with
completion expected by the end of this year.   
Our woodland planting proposals are fully designed
and an application for funding is with Scottish Forestry
for approval, with ground preparation works
anticipated to start late 2022 with 17,632 new trees
planted early 2023.   
An application to the UK Government’s Levelling Up
Fund Round Two (‘Levelling Up Fund’) was submitted
in early August, with the outcome expected in the
autumn.  If approved, this will accelerate the delivery
of future phases.   
Ayrshire Growth Deal
Great Harbour - Our long-term planning document for
the Great Harbour Project is currently being finalised. 
Alongside this we are developing our delivery strategy
as well as detailing how the funding will be
distributed.  This will allow us to ensure the project
remains within budget.   
Ardrossan Harbour – Potential design revisions are
being informed by consultation events that were held
earlier this year.  More than 120 written responses
were received as part of the consultation process
while 60 people attended public events held in
Brodick and our library in Ardrossan. 
Ardrossan Marina – This project has progressed
through the preliminary design stage including the
exploration of available engineering options. 
Following a revised costing exercise and current
challenging construction market conditions, we are
reviewing this project alongside our partners.   
Ardrossan Campus Site - In response to the
challenges faced by construction projects across the
country as a result of global economic factors, a
revised delivery programme has now been developed
which aims to open the Ardrossan Community
Campus development in August 2026.   
Marine Tourism - Our Cumbrae Transit Marina
Outline Business Case is now in development.  We are
in the process of agreeing the project programme and
timeframes related to the Millport Coastal Flood
Protection Scheme.   
We are currently looking at identifying a suitable
location for our Arran Transit Marina.  Throughout
this process we are engaging with Caledonian
Maritime Assets Ltd.   
A programme of engagement and consultation has
been established with community steering groups on
both Arran and Cumbrae to further inform the most
appropriate marina operating model.   
I3 Digital Innovation Campus - Our Phase 1 Full
Business Case for the Digital Processing
Manufacturing Centre was approved by the Ayrshire
Joint Economic Committee, alongside the lease
agreement for the facility.  Works are expected to be
completed by mid-January 2023 and we are expecting
the Phase 1 facility to be launched prior to end of
March 2023.   
Our Flexible Business Space Unit tender process is
complete for Phase 1 with the industrial unit and costs
confirmed.  Our Full Business Case was prepared and
submitted to the Project Management Office, Scottish
Government and Cabinet for endorsement.  Approval
will be sought from the Ayrshire Economic Joint
Committee in early December, following which the
tender can be awarded.   
Electric Vehicles
We continue to invest in our public Electric Vehicle
(EV) charging infrastructure, with the following
publicly accessible EV charge point installations
commissioned:
64

Page 65

Page 12 of 28 
♦ Ship House car park in Arran - 2 x 7kW EV charge
points
♦ Beach Drive car park in Irvine - 2 x 7kW EV charge
points 
The following chargers are expected to be
commissioned later in 2022:
♦ Skelmorlie Community Centre - 1 x 50kW EV
charge point
♦ Arran Education Centre as part of the Island
Infrastructure Fund - 2 x 7kW EV charge points 
We are also working in partnership with East and
South Ayrshire Councils, supported by Scottish
Futures Trust, as part of a pathfinder project to deliver
additional EV charging infrastructure.   
Regeneration External Funding
The following Regeneration Funding Proposals for
2022/23 under the Regeneration Delivery Plan were
agreed by Cabinet, including: 
♦ £1.093m Place Based Investment Programme
proposals for 2022/23 and their subsequent
implementation.  
♦ £1.32m Vacant and Derelict Land Fund proposal
for 2022/23, the Local Delivery Plan’s submission
to Scottish Government and their subsequent
implementation.  
♦ £1.385m awards under Strathclyde Partnership
for Transport’s (SPT) Capital Programme for
2022/23 for active travel and public transport
improvements and their subsequent
implementation.
♦ £0.86m Cycling Walking and Safer Routes
proposals for 2022/23 and their subsequent
implementation.   
We have submitted the following applications for
external funding:
♦ Two applications to Round 2 of the Levelling Up
Fund were submitted for Lochshore Park and a
joint North and South Ayrshire Council
Commercial Estate Low Carbon Infrastructure
project.
♦ Two applications to the Scottish Government’s
Vacant and Derelict Land Investment Programme
for the King’s Arms Redevelopment and Town
Centre Living Pilot projects in Irvine.  The King’s
Arms has now progressed to a stage 2 application
to be submitted in November.  Feedback and
alternative funding options to support our Town
Centre Living pilots are being assessed. 
The following projects are ongoing: 
♦ Development of the B714 Upgrade project
utilising Levelling Up Fund monies and our
Council’s Investment Fund.  Landowner and
stakeholder consultation is informing
development of the next stage (the Outline
Business Case).  
♦ Delivery of the approved £0.259m Islands
Infrastructure Fund projects including Mountain
Rescue car park upgrade, layby upgrades and new
EV charging points (see EV charging (left)).  
♦ Delivery of the £1.96m Ardrossan Low Carbon
Hub and Ardrossan Connections projects in
partnership with Sustrans.  
♦ Delivery of the UK Government Community
Renewal Fund (CRF) funded projects to pilot a
Place Framework approach in our town centres
and the Islands Green Programme.  Both
proposals have involved extensive public and
stakeholder consultation and engagement.  
♦ Launch of the second round of the Repurposing
Property Grant Fund to support landowners and
communities to bring vacant land and properties
back into positive use.   
Road Assets
Our second phase of the implementation of our new
asset management system that will help us manage
the condition of our roads is progressing.  This will
include the introduction of mobile working for
operational teams providing a more effective and
efficient means of managing reactive and routine
works.   
Digital Connectivity
The current percentage of our properties with access
to superfast broadband in North Ayrshire is 97.44%
(Scotland-wide figure is 95.30%).  Whilst the
percentage of properties has not increased
significantly in the last 12 months, the average
available download and upload speed has improved
significantly.  The mean download speed has more
than doubled in a year and is now 88 Mbps.  The
mean upload speed has doubled to 15 Mbps.  Though
we cannot directly influence this rollout, we monitor it
as it impacts directly on our residents and local
businesses.   
65

Page 66

Page 13 of 28 
Public Wi-Fi is also now available in 23 of our
community venues and was accessed by 48,558 users
between April and September 2022. 
Homes that meet residents’ needs
We have completed 79 new homes at the unique St
Michael’s Wynd development site in Kilwinning,
bringing a diverse range of homes to the area.  This
development includes 43 homes (including nine
designed for residents with wheelchairs), 24 sheltered
houses, 10 supported accommodations with a 24-
hour employee base and two amenity bungalows.
The St Colm’s Sheltered Housing unit in Largs is
complete and will provide 29 new accessible homes
for older people.  Work has also commenced on the
nearby former Largs Police Office (Court Street) site. 
Our officers from Housing, Legal and Finance have
been working closely with Scottish Futures Trust (SFT)
around the financial modelling for the ‘HOME’
alternative affordable housing model and to establish
and mitigate the financial risk.  Costs have been
updated to reflect the current situation with regards
to inflation, which has made the scheme
unaffordable.  In addition, SFT worked with the
Scottish Government regarding the classification of
tenancy and ownership.  They have confirmed they
wouldn't recognise it as a shared ownership scheme. 
Further work is required to establish the most
appropriate way forward.   
Our Private Sector Team dealt with 136 property
condition complaints between April and September. 
61 of these cases have been resolved, with the
remainder of the owners and landlords working with
the Private Sector Team to bring the properties up to
standard.  11 of these private properties failed to
meet the tolerable standard (the basic level of repair
for a property to be fit to live in).   
Vibrant, welcoming and attractive
environment
We secured an additional £509,000 of grant funding
from the Scottish Government Islands Programme to
support the Phase 2 restoration of Millport Town Hall. 
This funding will help fund the creation of office and
community space, conservation centre, permanent
Men’s Shed and small community garden.  Phase 1 of
the restoration (£2.3m) is progressing well.   
As part of the same round of funding – aimed at
supporting islands-based projects relating to climate
change, population retention and tourism – the
Scottish Government committed £540,000, supported
by further funding of £60,000 from our Council, for
the redevelopment of island toilet buildings on both
Arran and Cumbrae.  These Island Pit Stops are eco-
designed buildings with landscaped outdoors space
offering visitors sustainable and efficient amenities. 
Consultation and engagement will be undertaken with
our local communities, stakeholders and Elected
Members on Arran and Cumbrae to help shape the
detailed development of the proposals.   
Our residents in Largs, Saltcoats and Kilwinning are
taking part in a pilot project to shape their towns
through a Place Framework.  This framework
identifies the priorities and projects needing
addressed in each area.  Funded by the UK
Government's Community Renewal Fund and the
Scottish Government's Place Based Investment
Programme, a series of emerging projects and ideas
have been identified through discussions with our
communities and stakeholders, including during our
public engagement events in the towns in May, June
and August 2022.   
A sustainable environment 
We continue to progress with delivery of our two
solar farm developments, initiating the procurement
process in July 2022 for a design and build contractor,
with a view to appointment in early 2023.  Following
allocation of budget from the Council’s Investment
Fund, we are developing a range of sustainability
projects for implementation, including proposals for
further energy efficiency investment in our building
estate for delivery in 2023/24.   
Our bulky waste reuse partner Cunninghame
Furniture Recycling Company (CFRC) is now collecting
and sanitising mattresses as part of a new initiative to
improve opportunities for their reuse, funded through
a successful bid to the Scottish Government’s
Recycling Improvement Fund. 
Two new local strategies are under development and
will be the subject of consultation in 2022, with final
recommendations and plans coming forward for
approval in early 2023.  The local Transport and Active
Travel Strategy and the Vacant and Derelict land
Strategy will be considered by Cabinet in Spring 2022.  
66

Page 67

Page 14 of 28 
Inspiring Place – Case Study
Making Waves Festival
The RAF Red Arrows, Del Amitri, Red
Hot Chilli Pipers and Twin Atlantic were
among the entertainment at our first
ever Making Waves Festival in Irvine on
23rd and 24th July.  As well as the
concerts, a range of free activities drew
crowds to the waterfront event which
was organised by North Ayrshire
Council, Event Scotland, the Scottish
Maritime Museum and local music
promotors Freckfest. 
The world-renowned RAF Red Arrows
took to the sky for a spectacular
aerobatic display, having last performed above Irvine in 1993 during a BBC Radio 1 Roadshow.   
Our Maritime Museum welcomed thousands for a fantastic Ayrshire Makers Market along with free entry to a Sea
Monsters exhibition and family fun fair. 
More fun on and off the water included fairground rides, paddleboarding and activity stalls which all ages could
enjoy.   
Our harbourside’s cafes and bars provided attendees with a great range of food and drink, some staying open for
extended hours over the weekend. 
The economic impact report on the event shows that over 25,000 people turned out to view the Red Arrows display,
enjoy the music and/or visit the Scottish Maritime Museum and other attractions along the Harbourside.  In
summary: 
♦ Gross Direct Spend £1.1m 
♦ North Ayrshire Net Direct Spend £0.7m 
♦ North Ayrshire Net Additional GVA £0.3m 
♦ Seven Net full time equivalent (FTE) jobs created 
Ratings for the Festival were overwhelmingly positive, particularly relating to the staff and volunteers and the live
music.  Some of the comments left on social media included: 
“Massive credit to North Ayrshire Council.  What a
set up.  What a line up.  What a great festival” 
“Fab day, great atmosphere and everybody just having fun…
lovely to see all the kids having a great time as well” 
“Brilliant I had two nine year olds with me they
absolutely loved it, danced the whole time”
67

Page 68

Page 15 of 28 
Inspiring Place - Areas of Focus 
Well connected with effective infrastructure
♦ We will explore an alternative route for the
Brodick to Corrie Cycle Path.
♦ We will commission electric vehicle charging
points in Skelmorlie and Arran.
♦ We will launch our Phase 1 facility at I3 Digital
Innovation Campus.
♦ We will formally launch the Lochshore Park Hub
with a community event.
♦ We will seek approval for the Flexible Business
Space Unit from the Ayrshire Economic Joint
Committee.
♦ We will complete the construction of the 5km
leisure route and play areas as part of our
Lochshore Regeneration Project. 
Homes that meet residents’ needs
♦ We will explore options for an alternative
affordable housing model. 
Vibrant, welcoming and attractive
environment
♦ We will finalise our Open Space Strategy update
and accompanying Open Space Asset
Management Plan.
♦ We will finalise our Litter, Fly Tipping and Dog
Fouling Prevention Strategy to align with the
Scottish Government’s updated national strategy.   
A sustainable environment
♦ We will progress the next steps of our ‘remakery’
project to increase the level of re-use and repair.
♦ We will continue to clarify and report
transparently on our emissions so that
the North Ayrshire emissions baseline is clearly
understood.  This will be outlined in our Public
Bodies Climate Change Duties Report and Review
of North Ayrshire Environmental Sustainability
and Climate Change Strategy 3 Report presented
to Cabinet in November. 
68

Page 69

Page 16 of 28 
A Council for the Future – Key
Activities
An accessible Council that puts residents and
communities at the heart of what we do
We successfully delivered the Local Government
Elections on Thursday 5 May 2022 with a turnout of
44%.  The votes cast were counted electronically at
the Portal, High Street, Irvine on Friday 6 May 2022
and returned 33 Councillors for our area.   
Our Accessing our Council programme is progressing. 
We are initially focusing on shifting many of our
services online, while being mindful of digital
exclusion and protecting non-digital access.  We are
working to rationalise contact details to make it easier
for our residents and partners to contact appropriate
services.  This work strongly links into the ‘No Wrong
Door’ approach of our Tackling Child Poverty and the
Cost-of-Living Board. 
We have developed a dedicated ‘Cost of Living
Support’ page on our website where residents can
immediately see support provided by our Council and
can directly access the information.   
The Scottish Public Services Ombudsman (SPSO) has
published their Annual Performance Report 2021-22
which highlights how public services are handling
complaints in their area.  For our Council, none of the
24 complaints sent to the SPSO were taken to the
investigation stage.  They were resolved at either the
‘advice’ or the ‘early resolution’ stage.  Of the 24
complaints, 17 were closed under the ‘early
resolution’ stage with nine (53%) categorised as good
complaint handling.  This demonstrates that we have
robust complaint handling procedures in place.   
An efficient Council that maximises resources
and provides value for money
Our procurement process has been revised to ensure
more local businesses are able to quote for lower
value goods and services through the Quick Quote
process.  Full details are available in the Procurement
section above. 
New mobile technology has been purchased for our
domestic refuse collection vehicles, which will
improve the service information that is available to
our Customer Contact Centre and our residents. 
Work is continuing to progress the Single Use Plastics
Waste Prevention Action Plan following the ban on
certain single-use plastics on 1st June.  A three-phase
communication plan which links to the Environmental
Sustainability and Climate Change Strategy is ongoing
to encourage our employees and residents to be
'Plastic Smart'.   
A valued workforce that delivers high quality
services
We continue to promote our employee wellbeing
programme ‘LiveWell’ which now includes a new
‘SaveWell’ theme providing advice on energy saving,
affordable loans, accessing affordable food, white
goods, housing support, financial pressures and
mental health advice.   
We have paid the Real Living Wage since 2011 and
have committed to paying the new rate of £10.90 per
hour seven months early to help support our
employees through the current cost of living crisis. 
This will benefit 961 employees in predominantly
frontline roles. 
We held our first in person Leadership Conference
since the Covid-19 lockdown.  The event in June raised
awareness of the symptoms and effects of child
poverty and aimed to identify key ways for our
services to work together and support some of our
most vulnerable young people and their families. 
In September, we achieved the Disability Confident:
Level Three Leader award.  This demonstrates our
commitment to our employees who have a disability. 
Disability Confident encourages employers to think
differently about disabilities and encourages them to
take action to improve how they recruit, retain and
develop employees with disabilities 
We committed to the Miscarriage Association’s
Pregnancy Loss Pledge, encouraging a supportive
workplace where people feel safe and can discuss
pregnancy and/or loss without fear of being
disadvantaged.  We are providing employees and
managers with a range of updated resources and
guides.
69

Page 70

Page 17 of 28 
A powerful and respected voice 
Equality and Inclusion
We jointly held the first ever Hate Crime Conference
in Ayrshire, which was delivered by the Ayrshire
Equality Partnership (AEP).  The AEP includes all three
Ayrshire Councils (North, East and South), NHS
Ayrshire and Arran, Police Scotland, Scottish Fire and
Rescue and the Procurator Fiscal.  The conference
allowed partners to come together to share their
experiences in tackling Hate Crime, sharing best
practice as well as resources that are available for
organisations to help them support victims of Hate
Crime.   
A Council for the Future - Areas
of Focus 
An accessible Council that puts residents and
communities at the heart of what we do 
♦ We will implement our new Customer Portal that
will be fully integrated with the National
MyAccount.  This will include upgrading Housing
Rent and Council Tax account access.  
♦ We will renew our Public Services Network
Compliance Certificate.  
♦ We will deliver our Accessibility Approach to all
Council Services to raise awareness of Digital
Accessibility, ensuring all our services are
accessible to our residents.  
♦ We will review our current hybrid system
provision for committees and improve the future
delivery of hybrid meetings.     
An efficient Council that maximises resources
and provides value for money 
♦ We will continue to progress our “Accessing Our
Council” project, to ensure our services are as
accessible as possible.  This includes reviewing
and streamlining our transactions, such as forms
and systems.   
A valued workforce that delivers high quality
services 
♦ We will produce and collate information on
Mental Health Awareness to ensure a single point
of contact and produce guides for employees.  
♦ We will continue to develop our LiveWell
Programme which offers employees a range of
Health and Wellbeing Activities.   
A powerful and respected voice 
♦ We will continue our work with the Improvement
Service, Social Security Scotland and Glasgow City
Council on a data sharing pilot to help address
poverty in our communities.
♦ We will strengthen our Business Continuity
Planning with services and trade unions.  
♦ In partnership with the Scottish Government and
other councils, we will take forward the
procurement and implementation of an externally
provided Security Operations Centre. 
70

Page 71

Page 18 of 28 
Performance Summary 
Where performance indicator information is pending, the most recent status up to
2020/21 year end is used.  Indicators and actions adrift of target and not previously
reported are detailed on the next page. 
Aspiring Communities
♦ Active and strong communities 
♦ Children and young people experience
the best start in life 
♦ Inclusive, growing and enterprising local
economy 
♦ Residents and communities enjoy good
life-long health and well-being 
♦ Residents and communities are safe 
Inspiring Place
♦ Well connected with effective
infrastructure
♦ Homes that meet residents’ needs
♦ A vibrant, welcoming and attractive
environment
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that puts residents
and communities at the heart of what we
do
♦ An efficient Council that maximises
resources and provides value for money
♦ A valued workforce that delivers high
quality services
♦ A powerful and respected voice
Legend 
On Target / Complete
Slightly Adrift of Target
Significantly Adrift of Target
Status Unknown / Data Only
1
33%
2
67%
Performance Indicators
4
80%
1
20%
Actions
11
73%
2
14%
2
13%
Performance Indicators
15
83%
1
6%
2
11%
Actions
6
46%
4
31%
1
8%
2
15%
Performance Indicators
16
100%
Actions
71

Page 72

Page 19 of 28 
Performance Indicators Adrift of Target
This section details the performance indicators adrift of target and the action being taken to address performance. 
Due to expected data lags the most recent data may relate to previous time periods but may only now be available
to report.  To avoid duplication, only data that has not previously been reported to our Cabinet is included in this
section.   
The current status of the following indicators is being reported for the first time, however the data relates to 2021/22:, 
CP_10a % of Procurement Spent on Local Enterprises
The 2021/22 local enterprise spend percentage was 22.93%, which is lower than the target of 24%, however
performance has improved over the past two years and this represents the highest percentage of spend with local
businesses since 2017/18 (when it was 23.04%).  2021/22 performance also represents the second highest
proportion of spend with local suppliers since we began recording this measure in 2015/16.  We continue to
embrace Community Wealth Building by supporting local suppliers, such as through our revised Quick Quote
procedures detailed above.   
CP_26 Tourism Visitor Numbers
This figure has become available since our Year End report and relates to the 2021 calendar year.  The number of
visitors to North Ayrshire has increased as Covid-19 restrictions eased during this period.  Due to the restrictions in
2021, it is still below pre-pandemic levels, however we have plans in place which include events to attract tourism
back to North Ayrshire.   
The current status of the following indicator relates to mid-year 2022-23: 
CP_27 Street Cleanliness Index - % Clean (LGBF) 
Performance has reduced from 91.34% in 2020/21 to 86.3% as at September 2022, however the most recent figure
is provisional as final figures are provided through the Local Government Benchmarking Framework (LGBF) in
February 2023.    To help address performance, we have ordered larger capacity street bins and an evaluation of our
existing street cleaning schedule has been completed.  A pilot is underway to target poor performing streets with an
increased frequency of cleaning backed up by litter educational campaigns in these areas. 
Performance Indicators - Additional Information 
CP_08 % of Children Living in Poverty (After Housing Costs)
The most recent child poverty figures from the Child Poverty Action Group were published on 12th July 2022 and
relate to 2020/21.  This most recent data release appears to show that the percentage of children in poverty in
North Ayrshire has reduced to 24.7% during 2020/21 compared to 27.9% the year before.  This would mean it is
close to levels in 2014/15, however there are concerns around the accuracy of the 2020/21 figure due to the
pandemic.  Therefore, it is appropriate to highlight this measure in this report despite it being seen as on target.
The decrease seems unusual due to the expected impact of the pandemic.  These figures are sourced from
Loughborough University and are based on the Department for Work and Pensions (DWP) figures which come with
a caveat that they are impacted by Covid-19 (whereas 2019-20 figures were unaffected).  Due to the pandemic, the
method for gathering this information changed from focus groups to telephone calls (meaning it wasn’t possible to
verify if actual documents such as payslips etc.  were referred to during discussions) and the sample size was also
affected.  As a result, the UK Government states “We recommend that all users consider using the caveat: ‘Data
collection for FYE 2021 was affected by the coronavirus (Covid-19) pandemic.  Figures for FYE 2021 are subject to
additional uncertainty and may not be strictly comparable with previous years.’”
72

Page 73

Page 20 of 28 
In addition, the figures on the UK Government website show we have the second highest proportion of children
aged under 16 years old in relative or absolute low income families (as at year end 2021), behind Glasgow City
Council.
Addressing child poverty is a key aim of our Council as detailed throughout this report.  In addition, we are
developing a suite of local indicators that will support decision making as part of our Child Poverty Action Plan 2023-
26. 
Performance Indicator Amendments
CP_01 % of population who are involved in local decision making (as a percentage of the population) was
introduced in 2019 as an attempt to quantify our communities' participation in decision making.  However, it is not
possible to fully exclude potential duplication and as a result the figures could be misleading.  To ensure our
measures are as accurate as possible we are deactivating this indicator.  Participation is central to our Council Plan
and will continue to be managed through our Council Plan reporting, particularly via sub action “CP-SUB-04 We will
extend and mainstream our participatory approach to offer communities, including young people, more
opportunities to lead in local decision-making”.
Following the removal of CP_12 Percentage of learning disability service users accessing employment support
activities (as detailed in the Year End Progress Report and approved by Cabinet), we have identified two
replacement indicators that capture our supported employment activities.  CP_12a Number of unemployed
residents with a disability supported, and CP_12b Number of unemployed residents with a disability supported
into employment will demonstrate the current support that is in place and the results of that support in terms of
enabling residents with additional needs to access employment.  
As agreed by Cabinet in our 2021-22 Year End Council Plan Progress Update report, we are currently working with
the HSCP to identify a replacement for the discontinued indicator CP_13 Percentage of children with BMI centile
>91 at 27 month review.  This will now be detailed in our Year End Progress Update report.
CP_29 Overall carbon emissions (tonnes) – Provisional figures for 2021/22 have been updated as more information
has been made available.  This has changed the year end status of 2021/22 reported in our Year End Progress Report
from significantly adrift of target (red) to slightly adrift of target (amber).   
73

Page 74

Page 21 of 28 
Actions Adrift of Target
Within our Council Plan Delivery Plan overall actions are supported by sub actions.  Officers provide an update on
activity for each sub action and an estimate of the current status (red, amber or green).  Discussions between the
Corporate Policy, Performance and Elections Team and the service, followed by constructive scrutiny by the
Executive Leadership Team, inform the status of the overall action.  As a result, we are confident the statuses
accurately reflect our position.  This section highlights the reasons for underperformance within each action and
efforts being made to remedy it.    An overview of action performance can be shown in appendix three of this report. 
CP_05 We will expand our learning and childcare estate, including ensuring all eligible children are able to access
1140 hours of free childcare each year 
CP-SUB-08 Deliver major educational
new build and refurbishment projects
aligned to Scotland’s Learning Estate
Strategy: “Connecting People, Places
and Learning”
Due Date 30th June 2022
All large scale capital projects across our Learning Estate have been
adversely affected by external factors including the Covid-19 pandemic and
global economic factors.  However, all eligible children in North Ayrshire are
currently receiving 1140 hours of free childcare. 
CP-SUB-09 Develop an Outdoor Play
Strategy to support Early Years
Practitioners to provide excellent
learning and developmental
opportunities 
(Complete – no remedial note required)   
CP_15 We will let people decide how best to manage their own care needs and support people to live in their own
homes for as long as possible. 
CP-SUB-32 Grow Care At Home
capacity
(Due 31st March 2022.  It is proposed
to extend due date to March 2024, see
“Action Amendments” section below.)
Our Care at Home recruitment campaign has been very effective in growing
the workforce, this has been facilitated through TV and radio advertising,
leaflet drops and social media campaigns.  For the year to September 2022,
57 events were held across North Ayrshire with 365 people offered
employment as a result.   Care at Home is an area of high turnover but
overall in North Ayrshire the workforce has grown over the period.  Work
remains ongoing to continue to grow the service to fully meet the demand
for care in the community. 
CP-SUB-33 Prioritise Day Services
Model and Support for Carers.
(Due 31st March 2022.  It is proposed
to extend due date to March 2023, see
“Action Amendments” section below.)
The Partnership’s inhouse Day Services commenced a careful phased period
of re-opening on 6 June 2022 and have re-opened Day Services in all of the
localities on the mainland.  The Day Services are now successfully delivering
a mix of day services and outreach provision.
There is a programme of work underway to improve carer identification,
information and support services in North Ayrshire in line with the Carers
Act.   A range of plans are in place to expand the reach of carers
information, assessment and support, how to involve more carers in
collaborative decision making and getting resources (both personnel and
financial) to carers more quickly.  Proposals which have been formed in
collaboration with the Carers Advisory Group include increasing staffing
capacity, payments to carers with completed assessments, a softer
approach to assessment and support, support for young carers in
partnership with KA Leisure and Active Schools, the service specification for
the future Carers Service and support for involving carers in discharge
planning. 
CP-SUB-34 Prioritise integrated Island
services, including unscheduled care.
Recruitment is ongoing to the new and enhanced integrated roles on the
island, staff accommodation remains a challenge, a solution to this is being
74

Page 75

Page 22 of 28 
(Due 31st March 2022.  It is proposed
to extend due date to March 2023, see
“Action Amendments” section below.)
progressed and expected to positively impact on recruitment and mainland
support to Arran services from February 2023. 
CP-SUB-35a We will help individuals to
have better choice and control of their
support at an early stage by
reinvigorating Self-Directed Support. 
(Due 31st March 2022.  It is proposed
to extend due date to March 2023, see
“Action Amendments” section below.)
Good progress is being driven by a Self-Directed Support (SDS) Learning
Review Board which was established in June 2022 and is led by senior
employees and external interested partner stakeholders.  The review was
commissioned by the Chief Officer and Chief Social Work Officer to explore
the implementation and delivery of SDS.   
The review will provide strategic guidance and oversight to co-ordinate
recommendations made as a result, by identifying and supporting
opportunities to:
• Increase Social Work capacity to meaningfully deliver self-directed
support.
• Maintain staff wellbeing, both physical and psychological.
• Provide assurance to legislative and regulatory bodies that safe
practice is supported by good governance.   
CP_16 We will work with individuals and communities to support positive lifestyle choices which improve health and
wellbeing. 
CP-SUB-36 We will provide
opportunities for people to be more
active more often, through the Active
Communities Strategy 
(On target – no remedial note required) 
CP-SUB-37 We will work with Scottish
Government as a trailblazer site for the
whole systems approach to diet and
healthy weight (public health priority) 
(Due 31st March 2022.  It is proposed
to extend due date to March 2024, see
“Action Amendments” section below.)
The work of the Trailblazer was paused at national level as employees in
Public Heath were focused on the pandemic response and seconded
elsewhere.  During this time Lead Officers have attended the regular Catch
Up and Skills Sharing events to keep abreast of developments across the
sector.  Work has now been reactivated and officers have been involved in
active discussions with partners.  
Since early July there has been engagement with KA Leisure, partners in the
Active Communities Strategy and the CPP Board to develop a North Ayrshire
Wellbeing Alliance.  The Alliance will be led KA Leisure and its responsibilities
will be to deliver the Wellbeing priority in the Local Outcomes Improvement
Plan.  Other work that has clear strategic links with a whole systems
approach to diet and healthy weight includes:  The development of North
Ayrshire’s Fairer Food Network of community larders; and the renewal of
the four year strategic partnership agreement between the Council, North
Ayrshire’s Active Schools and sportscotland, with an enhanced capacity to
support diversity and inclusion. 
CP-SUB-38 Prioritisation of children
and young people receiving support
from Child and Adolescent Mental
Health Services.
(Due 31st March 2022.  It is proposed
to extend due date to September 2023,
see “Action Amendments” section
below.)
The HSCP and wider partners are working together to improve access to
Child and Adolescent Mental Health Services (CAMHS) and alternative
community supports to improve access for assessment and treatment for
young people.  CAMHS, which is an NHS service, has seen referrals to
increase month on month with demand now having doubled, the vast
majority of these being for Neurodevelopmental Assessment and diagnosis.
Accommodation has been secured and supported by North Ayrshire Council
to host the CAMHS Neuro Service and Community Eating Disorders Service
at West Road in Irvine.  This is an exciting opportunity to redesign a facility
with the concept of neurodiversity in mind and the recommendations of the
National Review of Eating Disorders Services.
75

Page 76

Page 23 of 28 
CP-SUB-39 Prioritise community
mental health services supporting
people within their communities.
(Due 31st March 2022.  It is proposed
to extend due date to March 2024, see
“Action Amendments” section below.)
Demand and capacity continue to remain challenging across mental health
services.  The Community Mental Health Team has been supported with
funding for social work capacity to recruit to additional Mental Health
Officers (MHO), Social Work and Social Work assistant posts, this resource is
essential to meet the growing demand and complexity of need in our
communities. 
The Scottish Government allocated a Communities Mental Health and
Wellbeing Fund which was distributed by Third Sector Interfaces (TSIs) to
communities across Scotland.  This is to support adults through community
based initiatives to help address the impact of distress and mental ill health
caused by social isolation and loneliness, as well as addressing mental
health inequalities made worse by the Covid-19 pandemic.  The funding has
been critical to the recovery of local communities.   
CP-SUB-40 We will place Mental
Health Practitioners into GP practices
to offer triage calls, urgent and routine
face to face assessments as well as
directing patients to the most
appropriate support without
unnecessary referrals to mental health
services.
Due Date 31 March 2022
The expansion of Mental Health Practitioners into GP practices is currently
on hold pending confirmation of funding from the Scottish Government. 
This was anticipated as part of the £120m investment as part of the Mental
Health Recovery and Renewal Fund but has been paused given other
financial pressures.  Plans have been developed in anticipation of funding
being released. 
CP-SUB-41 We will improve emotional
and mental health and wellbeing
through physical and social
participation in community activities,
including for young people.
(On target – no remedial note required)   
CP_38 We will use technology to improve access to and delivery of our services 
CP-SUB-90 Implement cloud solutions
where appropriate giving consideration
to business need, solution availability,
viability of business cases, cyber
security and information governance.
(On target – no remedial note required) 
CP-SUB-92 Deliver Cyber Resilience
Digital Services to support
technological innovation and provide
confidence in the security of our
infrastructure, data management and
technology.
(On target – no remedial note required) 
CP-SUB-93 We will review, refresh and
re-launch the Digital Strategy taking
account of learning from the Covid-19
pandemic.
(Due Date 31st March 2022)
A draft updated strategy is being reviewed following engagement with
businesses, learners and tourism. 
CP-SUB-94 We will work collaboratively
with our communities to streamline the
benefits process – helping residents
maximise income opportunities and
build relationships to support them.
(On target – no remedial note required)
76

Page 77

Page 24 of 28 
Action Amendments
To ensure transparency, where the Corporate Policy, Performance and Elections Team in partnership with services
feel an alteration to an action may result in more effective performance management, these recommendations are
listed below.
Many of the actions relate to the Education Services Plan as it is revised during the summer (end of the academic
year) but links into our Council Plan.   It is therefore appropriate to update the Council Plan sub actions relating to
our Education Service in this mid-year report.
Proposed New Sub Actions – Education 
Overall Action:  CP_06 - We will support our children and young people to become successful learners, confident
individuals, effective contributors and responsible citizens.
New proposed sub-actions:
1. Extend play methods and teaching practices from early years into Primary One and Two, through a pilot
programme in identified schools.  (Due 30th June 2023)
2. Promote progressive and interdisciplinary outdoor learning experiences with a focus on sustainable
development goals, directly related to our Environmental Sustainability and Climate Change Strategy.  (Due
30th June 2023)
3. Deliver a range of facilitated programmes and bespoke sessions, to support the leadership development and
enhance skills in context of education practitioners across all sectors.  (Due 30th June 2023)
4. Develop a three-year Raising Attainment Strategy to improve outcomes for all learners and reduce inequity
of outcomes, including a focus on accelerating progress in early primary and Early Learning Centres following
implementation of 1140 hours of childcare.  (Due 30th June 2023)
5. Develop an improving outcomes strategy (and action plan) for care experienced learners.  (Due 30th June
2023)
6. Establish an enhanced range of flexible and child centred learning provisions, curriculum and delivery
methods to meet a wide variety of support needs.  (Due 30th June 2023)
7. Deliver our Education Service's capital project programme for the 2022-23 academic year to ensure high
quality learning environments for all learners.  (Due 30th June 2023) 
Overall Action:  CP_07 - We will offer opportunities to our young people and their families to play a more active
role in school life and encourage more participation in learning opportunities.
New proposed sub-actions:
1. Co-create with our children and young people new ways to maximise learner participation and voice, as well
as create a new Learner Participation Policy.  (Due 30th June 2023)
2. Implement locally the revised ‘Learning Together’ Scottish Government parental involvement and
engagement action plan.  (Due 30th June 2023)
3. Continue to work collaboratively with establishments through the Family Learning Team and offer a wide
range of opportunities that enhance family learning in establishments.  (Due 30th June 2023) 
Overall Action:  CP_08 - We will work with our young people to build their resilience, supporting their mental
and physical wellbeing.
New proposed sub-actions:
1. Assist education establishments to implement the national mental health and wellbeing Whole School
Approach, including curricular, professional learning and parental supports.  (Due 30th June 2023)
2. Review approaches to promoting positive relationships and whole school nurture and continue to adapt our
approaches based on an analysis of need.  (Due 30th June 2023)
3. Support a range of targeted nurturing approaches, including nurture groups that will continue to develop the
social and emotional skills of identified children and young people so that they are able to be included and
nurtured within their local community.  (Due 30th June 2023)
77

Page 78

Page 25 of 28 
Overall Action:  CP_09 - We will work with schools, colleges, universities, businesses and partners to deliver
education, skills and training, helping people into work and sustaining employment.
New proposed sub-actions:
1. Through Developing the Young Workforce (DYW) co-ordinators and other partners, embed approaches to
planning, supporting and tracking post-school destinations for all school leavers.  (Due 30th June 2023)
2. Refresh and strengthen the focus of the school-college partnership and provide enhanced opportunities for
achievement, e.g., through the Regional Improvement Collaborative, in the senior phase.  (Due 30th June
2023)
3. Design tailored programmes with partners to provide enhanced support for specific groups of school leavers,
including those with identified needs.  (Due 30th June 2023) 
Overall Action:  CP_10 - We will make sure that everyone has the ability and knowledge to participate in the
digital world.
New proposed sub-action:
• Develop an Education Digital Skills Strategy and support establishments to achieve Digital Schools status,
ensuring that digital technologies are a central component of our approaches to quality learning and
teaching.  (Due 30th June 2023) 
Sub-Action Amendments 
CP-SUB-32 - Grow Care at Home Capacity
This is an ongoing action, therefore it is proposed the end date is extended from 31st March 2022 to 31st March 2024. 
CP-SUB-33 - Prioritise Day Services Model and Support for Carers.
This is a longer term action, therefore it is proposed the end date is extended from 31st March 2022 to 31st March
2023. 
CP-SUB-34 - Prioritise integrated island services, including unscheduled care.
Expected developments in this area mean extending this action from 31st March 2022 to 31st March 2023 will better
reflect performance. 
CP-SUB-35a - We will help individuals to have better choice and control of their support at an early stage by
reinvigorating Self-Directed Support.
Following the establishment of A Self-Directed Support (SDS) Learning Review Board in June 2022 and resulting
change in scope for this action, it is proposed this sub-action is extended from 31st March 2022 to 31st March 2023. 
CP-SUB-37 - We will work with Scottish Government as a trailblazer site for the whole systems approach to
diet and healthy weight (public health priority).
This work was paused due to the involvement of Public Health partners in the pandemic and resulting secondment
of partners to other roles.  However, it has recently recommenced and we now have a better understanding of the
expected due date.  It is proposed this sub-action is extended from 31st March 2022 to 31st March 2024. 
CP-SUB-38 - Prioritisation of children and young people receiving support from Child and Adolescent Mental
Health Services.
Expected developments including opportunities to host services at West Road, Irvine, mean extending this sub-
action’s due date form 31st March 2022 to 30th September 2023 will better reflect performance. 
CP-SUB-39 - Prioritise community mental health services supporting people within their communities.
This is an ongoing action, therefore it is proposed the end date is extended from 31st March 2022 to 31st March 2024. 
CP-SUB-42 Work closely with colleagues in Acute Services and Police Scotland to address the levels of
unscheduled care in mental health.
It is proposed the end date is extended from 31st March 2022 to 30th September 2023 to reflect the opening for the
new mental health hub at Woodland View, Irvine in the spring.
78

Page 79

Page 26 of 28 
Trend Charts 
Key:  
0
100,000
200,000
300,000
400,000
500,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_15 Number of attendances at
indoor sports & leisure facilities
(Excluding Pools)
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_29 Overall Carbon Emissions
(Tonnes)
0%
1%
2%
3%
4%
5%
2019/20 2020/21 2021/22 2022/23
CP_02 % of Council budget directed
via participatory methods
0
10
20
30
40
50
60
2019/20 2020/21 2021/22 2022/23
CP_22 Number of electric vehicle
charging points publicly available
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_31 % of total household waste
that is recycled (Calendar Year as
per SEPA) (LGBF)
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_33 % of Self Service
Transactions
79

Page 80

Page 27 of 28 
Best In Class 
Our Senior Manager for Customer Services was invited
to present at a national webinar ‘Child Poverty and
the Cost of Living Crisis’ led by the Improvement
Service in September.  This included presenting our
approach to delivering top-up bridging payments of
£100 to low-income families.  
East Lothian Council have approached us to learn
more about our fuel poverty payments approved by
Cabinet in August.
We continue to contribute to both the national
UNCRC Implementation Network and Child Poverty
Peer Group led by the Improvement Service.    This
has led to becoming joint leads in a pilot to explore
data sharing with Social Security Scotland, with the
aim of ensuring some of our most vulnerable
residents are aware of support available to them. 
Working in partnership with the Improvement Service
and Glasgow City Council, if successful it could help
deliver better outcomes for residents locally and
nationally.
The North Ayrshire Council Strategic Community
Learning and Development Plan 2021-2024 was
developed through consultation and engagement with
communities.  Education Scotland undertook an
Aspect Review in May 2022, with a focus on Food with
Dignity and Community Food Networks.  As a result,
North Ayrshire Community Learning and Development
Service will feature in the report as a good practice
example.  
Our Corporate Policy, Performance and Election Team
provided support to Aberdeenshire Council on their
performance framework, strategy and Council Plan.
The Scottish Government have commended the
approach in North Ayrshire in delivering the Long-
Term Unemployed programme, exceeding the job
creation targets set for the area.
In addition, the Scottish Government gave very
positive feedback on the quality of the submissions to
the 2022/23 Islands Programme fund.
Neighbourhood Services performed well in the Best
Kept War Memorial national competition judged by
the British Legion.  The Saltcoats memorial won the
overall award and the Kilwinning memorial was
Champion of Champions, Stevenston and Ardrossan
memorials also received recognition.
Recently published SEPA recycling rates for 2021 show
we have the second highest recycling rate of the 32
Scottish local authorities.  
We were awarded gold level re-accreditation in July
2022 by the Tenant Participation Advisory Service
Scotland (TPAS) for our approach to customer
engagement, analysis of services and digital
engagement.  Bronze, silver, or gold accreditation is
awarded to organisations based on how well they
perform in regard to tenant participation services and
is nationally recognised for providing an impartial
report on performance.
Our Senior Manager for Waste and Streetscene
Strategy and Contracts is participating in the new
National Fly Tipping Forum and contributing to the
development of the revised National Litter and Fly
Tipping strategy, which will have a six-year lifespan. 
The strategy will outline actions under behaviour
change, services and infrastructure and enforcement.
One of our Building Services apprentices was
shortlisted for the UK Apprentice of the Year finalist. 
80

Page 81

Page 28 of 28 
“Can you thank the Streetscene team on my
behalf for the wonderful job they did cutting the
grass at Coldstream, West Kilbride, it’s much
appreciated.”
North Ayrshire Resident 
What Our Customers Say 
“I used the Bartonholm recycling centre.  I
want to compliment the council and staff at
the centre for doing a great job.  The staff
were polite and helpful and the centre was
neat and tidy and looked cared for.  The lady
that I spoke to was especially helpful and she
was busy with a broom keeping the place in
good shape and clearly has pride in her work. 
Long may this go on.”   
North Ayrshire Resident 
“Thank you for your recent classes at Beith
library, my son has enjoyed attending the
organised events and looks forward to Fridays’
Digi Dabble.  Absolutely amazing to have these
over the summer and all free.
The ladies are absolutely wonderful and the girl
who took the sewing class on Thursday was very
patient and amazing with the children, very fun
and engaging.
We look forward to all our future visits
especially the weekly Saturday Lego club which
is now very much part of our weekend routine.”
North Ayrshire Resident 
“I want to say how happy I am at the brilliant
service I have had from the Homeless team to
the housing allocation and Largs housing.  After
what was a terrible personal situation myself
and my children found ourselves, I reluctantly
reached out for help and to say I was
overwhelmed by the kindness of every person I
spoke to is an understatement!
I will always be very grateful for the support I
received.  And my children and I finally have a
safe place to call our home.  Many thanks
NAC!!”
North Ayrshire Resident 
“Hi, there are some faulty lamp posts
burning throughout the day.  Please can
someone investigate?”
North Ayrshire Resident
“Thank you for reporting this fault.  I can confirm
our electrician has attended and repaired the
timeclock within the lamp posts and they are now
not on during the day.”
North Ayrshire Council Representative
“The beach was beautiful today, lovely and clean with no
rubbish, excellent job done keeping it looking well
groomed.”
North Ayrshire Resident
81

Page 82

For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 324648 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
82

Page 83

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 1 of 6
Appendix 2 – Council Plan Performance Indicators 
Priority - Aspiring Communities 
1 This figure is provisional pending further data.
PI Status 
Significantly Adrift of Target 
Slightly Adrift of Target 
On Target 
Data Only 
Data Not Available
PI Code & Description
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_02 Percentage of Council budget
directed via participatory methods 1.11% 0.89%  1.13% 1.2%  2.32% 1.1%  1.76%1 1% 
CP_03 Percentage of residents who
agree they have access to
opportunities to participate in their
local community
47% 47%  47% 47%  - 47%  Measured Annually 
CP_04 Percentage of children
achieving their developmental
milestones at the time the child starts
primary school
N/A 79%  72% 80%  78.5% 78%  Measured Annually 
CP_05 Average total tariff score of
pupils living in SIMD 30% most
deprived areas
685.8 718  744.7 724 
Due
Feb
2023
710 
Measured annually, next
data release due February
2023.
83

Page 84

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 2 of 6 
2 CP_08 Children Living in Poverty (After housing costs):  Data collection for 2020/21 was affected by the coronavirus (Covid-19) pandemic.  Figures for FYE 2020/21 are subject to additional uncertainty
and may not be strictly comparable with previous years.  Please see ‘Performance Indicators - Additional Information’ section for more details.
PI Code & Description
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_06 Average tariff score: All
Leavers 857.4 895  912 900 
Due
Feb
2023
880 
Measured annually, next
data release due February
2023.
CP_07 Percentage of school leavers
entering positive destinations (LGBF) 92.5% 96%  95.2% 96.2% 
Due
Feb
2023
96.2% 
Measured annually, next
data release due February
2023.
CP_08 Percentage of children living
in poverty (after housing costs) 27.9% 26.5%  24.7%2 26.5% 
Due
July
2023
26.5%  Measured annually, next
data release due July 2023.
CP_09 Percentage of working age
population in employment 70.2% 70%  69% 64.7%  66.3% 70%  67.8% - 
CP_10a Percentage of procurement
spent on local enterprises 19.98% 23%  21.39% 23.5%  22.93% 24%  Measured Annually
CP_11 Percentage of people earning
less than the living wage (LGBF) 16% 24%  16.2% 23% 
Due
Feb
2023
22%  Measured Annually
CP_14 Percentage of households in
fuel poverty 28% 25.5%  28% 28% 
Due
Feb
2023
28%  Measured Annually
84

Page 85

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 3 of 6 
3 We are continuing to work closely with KA Leisure to support and promote their services.
PI Code & Description
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_15 Number of attendances at
indoor sports & leisure facilities
(excluding pools)
1,859,843 1,964,100  71,913 736,915  298,806  105.089
3 
CP_16 Percentage of people aged 65
and over with long-term care needs
who receiving personal care at home
(LGBF)
69.42% 66%  69.51% 66% 
Due
Feb
2023
66%  Measured Annually
CP_17 Emergency Admissions
(Number) 19,150 20,257  16,283 20,257  17,966 20,257  Measured Annually
CP_18 Percentage of new tenancies
to applicants who were assessed as
homeless sustained for more than a
year
84.07% 82%  92.48% 85%  86.92% 85%  Measured Annually
85

Page 86

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 4 of 6  
Priority - Inspiring Place 
Code & Short Name
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)
90.89% 93%  91.05% 93% 
Due
Feb
2023
93%  Measured Annually
CP_20 Overall percentage of road
network that should be considered
for maintenance treatment
37.3% 38.1%  37.1% 38.1%  33.9% 37.5%  Measured Annually
CP_21 Proportion of properties
receiving superfast broadband
(LGBF)
94.1% 97%  94.7% 97% 
Due
Feb
2023
97%  Measured Annually
CP_22 Number of electric vehicle
charging points publicly available 36 30  45 42  49 43  57
Not
possible
to set
quarterly
targets
due to
nature of
roll out of
EV points
with
private
partners 
CP_23 Number of new build
Council housing units reaching
completion (cumulative)
381 351  437 755  681 630  Measured Annually
CP_24 Number of empty homes
brought back into use (cumulative) 594 500  594 600  1,051 600  Measured Annually
86

Page 87

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 5 of 6   
4 CP_27 Street Cleanliness Index - Percentage Clean (LGBF) – This is a provisional figure based on an audit in late October 2021.  The final figure will be confirmed through the Local Government
Benchmarking Framework (LGBF) in February 2023.
5 CP_29 - As we continue to broaden the scope of what we measure within our carbon emissions, this indicator will evolve to capture elements such as carbon emissions resulting from our supply chains
as well as other areas.  This will ensure as accurate a picture as possible of our emissions but may mean years are not directly comparable depending on when additional information begins to be
captured.  Please see ‘Performance Indicator Amendments’ section for more details.
Code & Short Name
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_25  Percentage of Council
dwellings that meet the Scottish
Housing Quality Standard (LGBF)
99.36% 99.4%  98.83% 99.5% 
Due
Feb
2023
99.5%  Measured Annually
CP_26 Tourism Visitor Numbers 1,599,400 1,534,968  315,620 1,534,968  858,300 1,534,968  Measured Annually
CP_27 Street Cleanliness Index - 
Percentage Clean (LGBF) 94.6 94  91.34 94  89.54 94  86.3 90 
CP_28 Hectares of vacant &
derelict land in North Ayrshire 1,180 1,244  1,204 1,194  1,198 1,144  Measured Annually
CP_29 Overall carbon emissions
(tonnes)5 37,508 39,320  22,846 35,127  21,791 21,247  3,942 - 
CP_30 Total installed capacity of
low carbon heat and electricity
generation across the Council's
estate
9,700 9,700  10,720 9,800  11,680 11,000  Measured Annually
CP_31 Percentage of total
household waste that is recycled
(calendar year as per SEPA)
(LGBF)
56.3% 59%  52.1% 52.1%  56.4% 53.1%  58.8% 51% 
87

Page 88

Appendix 2 - Council Plan Performance Indicators  Mid-Year 2022-23 Page 6 of 6  
Priority - A Council for the Future 
Code & Short Name
2019/20 2020/21 2021/22 Q2 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_32 Percentage of
Customers delighted with the
overall Customer Service
81% 77%  Surveys suspended due to Covid-19 and due to resume in
2022/23. Measured Annually
CP_33 Percentage of Self-
Service Transactions 41.26% 40%  58% 45%  58.33% 50%  63% 50% 
CP_34 Employee Engagement
Level - Council Wide 70.67% 70%  No survey planned 
88

Page 89

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 1 of 6  
Appendix 3 - Council Plan Action Tracker 
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aspiring Communities 
What we’
ll do to make active and strong
communities
CP_01 We will build stronger relationships between the council,
communities and partners.                      
CP_02
We will co-produce a local charter with our communities
which sets out the things we jointly commit to do for each
other, to help each other create a better North Ayrshire.         
Complete 
CP_03
We will extend our participatory approach, offering
communities more opportunities to lead in local decision-
making.                      
CP_04 We will support communities to achieve what’s important to
them through strong local networks.                      
What we’
ll do to ensure our
children and young people
experience the best start in life
CP_05
We will expand our early learning and childcare provision to
make sure all eligible children are able to access 1140 hours of
free care each year.                 
CP_06
We will support our children and young people to become
successful learners, confident individuals, effective
contributors and responsible citizens.                     
CP_07
We will offer opportunities to our young people and their
families to play a more active role in school life and encourage
more participation in learning opportunities.                     
89

Page 90

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 2 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP_08
We will work with all young people to build their resilience,
supporting their mental health and physical well-being.           
What we’
ll do to have an inclusive, growing
and enterprising local economy
CP_09
We will work with schools, colleges, universities, businesses
and partners to deliver education, skills and training, helping
people into work and sustaining employment.                    
CP_10 We will make sure that everyone has the ability and
knowledge to participate in the digital world.                      
CP_11 We will support our local businesses to become more
innovative and competitive.                      
CP_12 We will promote fair employment practices.                      
CP_13 We will develop and implement a Community Wealth Building
(CWB) strategy.                      
What we’
ll do to make
sure North Ayrshire
residents and communities 
CP_14
We will continue our work with partners, including the
Scottish Government, to explore the feasibility of a Scottish
Basic Income Pilot.     
Complete
CP_15
We will let people decide how best to manage their own care
needs and support people to live in their own homes for as
long as possible.                      
CP_16 We will work with individuals and communities to support
positive lifestyle choices which improve health and wellbeing.                      
90

Page 91

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 3 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we will do
to ensure North
Ayrshire    CP_17 We will work with partners to support our vulnerable
residents and communities.                      
CP_18 We will extend the ‘Housing First’ pilot to address
homelessness.                      
Inspiring Place
What we’
ll do to make North Ayrshire well-connected with
effective infrastructure
CP_19
We will provide well-maintained, integrated travel and
transport networks, supporting alternative and sustainable
transport.                      
CP_20
We will work with partners to make sure there is sustained
investment in our roads, ports and harbour infrastructure to
ensure that travel is resilient and reliable.                      
CP_21 We will work with partners to extend public wi-fi and improve
our digital connectivity.                 
CP_22
We will provide an appropriately sized, fit for purpose,
energy-efficient and digital- enabled property portfolio,
including our schools.                      
CP_23
We will attract investment, through the Ayrshire Growth Deal
and other means, to support regeneration and job creation at
our key development sites of i3 Irvine, Hunterston, Lochshore,
Ardrossan Marine Quarter, and the Irvine Great Harbour.                      
CP_24
We will support our communities to maximise the use of
community assets (such as schools) and encourage
Community Asset Transfers.                      
CP_25
With our social landlord partners, we will build new, modern,
energy-efficient lifelong homes for life, tailored to the needs
of tenants.                      
91

Page 92

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 4 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we’
ll do to provide
our residents with homes
and houses that meet their 
CP_26 We will actively promote a mix of homes by facilitating private
housing development.                      
CP_27
We will work with property owners and landlords to make
sure our private housing is suitable for the needs of our
residents.                      
CP_28 We will form a partnership with other Councils to introduce a
low-cost energy offer.    
Off
Programme
No longer being pursued following a decision by Nottingham City
Council to sell their not-for-profit energy company to British Gas
following significant financial losses.
What we’
ll do to make North Ayrshire a
vibrant, welcoming and attractive environment
CP_29 We will provide well-kept public places and town centres
which will benefit our residents, visitors and businesses.                      
CP_30 We will, where possible, bring empty properties back into use.                      
CP_31 We will work with communities to improve the quality of the
local environment through a participatory approach.                      
CP_32 We will develop North Ayrshire as a coastal and island
destination, attracting tourism investment and visitors.                      
92

Page 93

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 5 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we'll do to make sure we all live in a
sustainable environment
CP_33 We will support a circular economy by re-using, recycling and
generating energy from the waste we manage.                      
CP_34 We will develop additional low carbon renewable energy
schemes and networks.                      
CP_35
We will protect our communities by delivering the Local Flood
Risk Management Plan, the Shoreline Management Plan and
the Millport and Upper Garnock Valley Flood Protection
Schemes.                      
A Council for the Future
An accessible Council that puts
residents and communities at
the heart of what we do CP_36
We will work with communities and key stakeholders to
radically review what we do and how we do it, to deliver cost
effective services.                      
CP_37 We will provide joined up services across the Council and with
partner agencies and communities.                      
CP_38 We will use technology to improve access to and delivery of
our services.                      
93

Page 94

Appendix 3 - Council Plan Actions  Mid-Year 2022-23 Page 6 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
A powerful and
respected voice
CP_39 We will make our case nationally, regionally and locally levels
to secure investment to support delivery of our priorities.                      
An efficient Council that
maximises resources and
provides value for money
CP_40 We will review what we do and how we do it to ensure we
deliver the best possible services.     
This action was removed as approved by Cabinet in August 2021 as
it duplicates CP_36 and CP_37.
A valued workforce
that delivers high
quality services
CP_41 We will empower and invest in our workforce to develop new
and innovative ways of working.                       
94

Page 95

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    Internal Audit Plan 2023/24 
Purpose:  To inform the Committee of the proposed Internal Audit plan for
2023/24. 
Recommendation:  That the Committee approves the Internal Audit plan for
2023/24. 
1. Executive Summary 
1.1 This report presents the proposed Internal Audit Plan for 2023/24. A review has been
carried out, including consultation with members of the Executive Leadership Team, to
identify areas which will be subject to audit review. 
1.2 The audit plan is risk-based and fully utilises the available resource of 647 audit days. 
2. Background 
2.1 The work of Internal Audit is governed by the requirements of the Public Sector
Internal Audit Standards (PSIAS) 2017. The standards, issued jointly by the Chartered
Institute of Public Finance & Accountancy (CIPFA) and the Chartered Institute of
Internal Auditors (IIA), require the Senior Manager (Audit, Fraud, Safety & Risk) to
establish a risk-based internal audit plan to determine the priorities of the internal audit
activity, consistent with the Council’s goals and objectives. 
2.2 In the development of the internal audit plan, the PSIAS requires the Senior Manager
to consult with senior management and obtain a thorough understanding of the
Council’s strategies, key business objectives, associated risks, and risk management
processes.  The audit plan also needs to be flexible, with the ability to adjust in
response to changes in the business, risks, operations, programmes, systems and
controls. 
2.3 The objective of the work of internal audit is to enable the Senior Manager to form an
evidence based independent opinion at the end of the year on the adequacy of the
Council’s internal control, risk and governance arrangements.  This opinion forms part
of the Annual Governance Statement for the year which is included within the
Council’s financial statements. 
Agenda Item 7
95

Page 96

2.4 The Internal Audit Charter is a formal document which defines the internal audit
activity’s purpose, authority and position. The Senior Manager reviews the Internal
Audit Charter on an annual basis and presents any changes to the Audit and Scrutiny
Committee for approval. The Internal Audit Charter has been reviewed and an
updated version is presented to this meeting of the Committee for reapproval. 
2.5 The Senior Manager is also required to ensure that internal audit resources are
appropriate, sufficient and effectively deployed to achieve the approved plan. The
Internal Audit Team currently comprises a Senior Manager, an Internal Audit Manager,
two Internal Auditors and a Computer Auditor.  All members of the team hold
professional accountancy or audit qualifications and are suitably experienced. 
2.6 The resources available to deliver the internal audit plan take into account an estimate
of the number of available working days per team member.  The total estimate for the
year is detailed as follows: 
Activity Planned Days
Audit reviews 462
Time allocated to the North Ayrshire Integration Joint
Board
15
Consultancy and contingency (including non-fraud
investigations)
55
Other planned audit days (e.g. follow up, audit planning,
reporting to Committee and internal audit development)
115
Total 647 
2.7 Appendix 1 contains the detailed audit plan for 2023/24 with an allocation of audit
days assigned to each assignment. It should be noted that these audit days are
indicative only. The plan may therefore be subject to change throughout the year,
depending on a number of factors such as available resources, time required to
complete reviews, and unplanned work arising throughout the year. 
2.8 The internal audit plan for 2023/24 is risk based, as required by the standards. A
number of sources of evidence are used to identify all potential auditable areas and to
assess the risk or significance of each one to ensure the plan adds the most value to
the Council. The process includes:
• maintaining an up-to-date audit universe of all potential auditable areas;
• consultation with members of the Executive Leadership Team (ELT);
• review of the Council’s operational, corporate and strategic risk registers;
• review of the Council Plan 2019-24;
• review of national publications from Audit Scotland, CIPFA and IIA; and
• knowledge of the business through previous audit assignments and internal
audit’s own risk assessment of those areas. 
2.9 Examples of the key risk factors which have influenced the 2023/24 internal audit plan
are as follows:
• The financial environment in which the Council is operating has been identified as
a strategic risk for the Council, and therefore a review of the financial viability and
resilience of the Council is included in the audit plan for 2023/24.
• In order to facilitate payment for low value transactions, Council services use
corporate procurement cards. The potential misuse of these cards is identified by
internal audit as a high risk and therefore further work will be carried out in
96

Page 97

2023/24 to assess the adequacy and effectiveness of arrangements that are in
place to ensure compliance with relevant policies and procedures.
• Transformation and change management is identified as a strategic risk for the
Council. Internal audit will focus on the governance arrangements in place to take
forward a programme of transformational change.
• European Structural and Investment Funds (ESIF) ended in December 2022 and
are being replaced by the UK Shared Prosperity Fund (SPF). With the final
drawdown of all funds to be completed by 31 December 2023, the internal audit
review will focus on the accuracy and completeness of claims to ensure all funds
due to the Council are drawn down in advance of this deadline.
• iPayImpact is a secure online payment platform for parents and carers to pay for
school meals, trips and events online. The system was introduced in 2021/22 and
a review will be carried out to ensure key policies and procedures exist for the
management of the system, and that adequate controls are in place for any
manual interventions.
• The cost of living crisis, including the rising costs in relation to construction, has
led to the addition of two reviews within the proposed audit plan – capital
monitoring, and rental income and arrears.
• Climate change is highlighted not only as a strategic risk for the Council, but also
recognised as a global risk.  Internal audit will be involved in a consultancy
capacity in the Council’s 4th iteration of the Environmental Sustainability &
Climate Change Strategy.
• Cyber resilience is identified as a strategic risk for the Council. Added to this,
most global risk literature continues to identify cyber security as the number one
global risk. The Scottish Government’s cyber resilience framework is intended to
support public sector organisations to develop and improve their cyber security
arrangements. Internal audit will base the next phase of cyber resilience audits on
aspects of this framework.
• Regular coverage of the Ayrshire Growth Deal (AGD) is required by the
governance arrangements for the programme. Audit work in 2023/24 will focus on
the AGD revenue projects. 
2.10 Progress against the internal audit plan will be reported quarterly to the Audit &
Scrutiny Committee. 
2.11 Training needs within the service are reviewed on an annual basis during the
Council’s Our Time to Talk process, as well as ad-hoc opportunities identified during
the year as events arise. The Senior Manager is an active member of the Scottish
Local Authorities Chief Internal Auditors Group (SLACIAG) and the IIA’s Local
Authority Forum.  The Computer Auditor is an active member of the Computer Audit
Sub-Group of SLACIAG (CASG).  All members of the internal audit team will be
attending the SLACIAG two-day conference in June 2023. 
3. Proposals 
3.1 It is proposed that the Committee approves the Internal Audit plan for 2023/24. 
97

Page 98

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Consultation has taken place on an individual basis with the Executive Leadership
Team during the preparation of the Internal Audit plan. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None. 
98

Page 99

APPENDIX 1
Key Corporate Systems Audit Objective
Total
Indicative
Days
Accounts payable Review controls in place within a sample of services around their use of Procurement Cards 15
Financial resilience and  viability Review the arrangements and assumptions around medium and long term financial plans and strategies, tested against the CIPFA Financial Management
Code 15
HR/Payroll systems Review the controls within the Education network for leavers and movers 15
TOTAL AUDIT DAYS 45
Other Systems Audit Objective
Total
Indicative
Days
Capital Monitoring Examine the effectiveness of the Council's capital monitoring arrangements 15
HR/Payroll policies and procedures Review the Council's workforce planning arrangements 15
Supply teachers Review new system and associated procedure notes for the management and booking of supply teachers 15
Pupil Equity Funding/ Closing the Attainment
Gap Review a sample of schools and ensure PEF spending is in accordance with plans, and there is a clear link between spend and closing the attainment gap 15
Transformation and Change Management Review the Council's approach to transformation and its progress with best value 20
Self-Directed Support Review the use of 'Self Directed Support' to provide assurance that appropriate controls are in place and operating effectively 15
Carers Act Review progress with the delivery of the requirements of the Carers (Scotland) Act 2016 15
Community based support - Adults Review controls in relation to Community based support, with a particular focus on Adults 15
Integration Joint Board audit days Carry out audit work as agreed by the Performance and Audit Committee of the North Ayrshire Integration Joint Board 15
Employability Review of European monies to ensure controls are in place for the full drawdown of ESF prior to the final closure of the programmes 15
iPayImpact Review the controls around the collection of income through the new iPayImpact online payment system for schools 15
Housing - rental income and arrears Examine a range of controls within Housing with a focus on the processes for the management of rent arrears 15
Property Asset Management Review the Council's property asset management arrangements focussing on the Property Lifecycle Investment fund 15
Waste Consultancy assignment - participation in an advisory capacity in the comprehensive review of Waste Management 10
Sustainability & Climate Change Consultancy assignment - provide real-time advice and feedback on the 4th Environmental Sustainability & Climate Change Strategy 15
TOTAL AUDIT DAYS 225
ICT Auditing Audit Objective
Total
Indicative
Days
ICT - information security management Utilising the Scottish Government's cyber resilience framework, review controls around information security management 20
ICT - access control Utilising the Scottish Government's cyber resilience framework, review controls around access 20
ICT - environmental and physical security Utilising the Scottish Government's cyber resilience framework, review controls around physical and environmental security 20
ICT - business continuity Utilising the Scottish Government's cyber resilience framework, review controls around business continuity in the event of a cyber incident 20
TOTAL AUDIT DAYS 80
Governance Audit Objective
Total
Indicative
Days
Code of Corporate Governance Review aspects of the Council's arrangements for completion of the Delivering Good Governance Framework 10
Ayrshire Growth Deal Review the arrangements in North Ayrshire Council in relation to the Ayrshire Growth Deal revenue projects 20
Community Planning Community keyholding arrangements 10
TOTAL AUDIT DAYS 40
INTERNAL AUDIT PLAN - April 2023 to March 2024
NORTH AYRSHIRE COUNCIL
[PUBLIC]99

Page 100

Regularity Audits Audit Objective
Total
Indicative
Days
Accounts Payable Transaction Testing Use data analysis software to interrogate the HR/Payroll system and examine any anomalies which arise. 15
Payroll Transaction Testing Use data analysis software to interrogate the Accounts Payable system and examine any anomalies which arise. 15
Early Years Centres Review financial and other controls within the Council's stand alone Early Years Centres 10
TOTAL AUDIT DAYS 40
Following the Public Pound Audit Objective
Total
Indicative
Days
Community Funding Examine the controls around funding support provided by the Council to a range of community groups 15
Regeneration Delivery Plan and Funding Review of Place-based investment programmes and funding streams 20
Community Councils Annual audit of Community Councils accounts' to ensure Council funding is used in accordance with the Council's Scheme of Administration. 10
Tenants and Residents Associations Annual audit of the accounts of various Tenants and Residents Associations 2
TOTAL AUDIT DAYS 47
Other Planned Audit Work Audit Objective
Total
Indicative
Days
Prior year audit work Finalising audits from the 2022-23 audit plan that were not fully complete by the end of March 2023 44
Audit consultancy: ad-hoc advice Providing advice to council services in response to ad-hoc queries 10
Audit consultancy: project work Participating in project work to support developments in other council services 25
Follow-up Follow up of previous audit reports to ensure that appropriate action has been taken 15
Audit planning and monitoring Preparing audit plans and monitoring progress and performance against plans 20
Audit and Scrutiny Committee Supporting the Council's Audit and Scrutiny Committee by preparing reports, attending meetings and delivering training for elected members as required 25
Governance documents Review of governance documents (e.g. Codes of Financial Practice) 2
Development of the Audit service Carry out developmental work to further enhance the efficiency of the audit section 5
Internal Audit self-assessment against PSIAS Undertake a quality assurance programme for Internal Audit in line with the requirements of the Public Sector Internal Audit Standards (PSIAS) 2
Annual Accounts Work in relation to the Council's annual accounts for preparing the Annual Governance Statement 2
TOTAL AUDIT DAYS 150
Contingencies & Investigations Audit Objective
Total
Indicative
Days
Non-Fraud Investigations Time allocated for unplanned non-fraud investigations arising during the year 20
TOTAL AUDIT DAYS 20
TOTAL AUDIT PLAN 2023-24 647
[PUBLIC]100

Page 101

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    Internal Audit and Corporate Fraud Action Plans: 
Quarter 3 update 
Purpose:  To advise the Audit and Scrutiny Committee on the progress
made by Council Services in implementing the agreed actions
from Internal Audit and Corporate Fraud reports as at 31
December 2022. 
Recommendation:  That the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions;
and (b) challenges those Services that have not implemented
actions within the previously agreed timescales. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in Scotland'
highlights that Audit Committees should monitor and review the progress made in
implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented.  This provides
assurance that identified control weaknesses have been addressed and are being
managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action.  This enables Internal
Audit to monitor progress on a 'real-time' basis and address any delays in
implementation. 
1.4 This report details the position at 31 December 2022. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 15 November 2022 highlighted
that there were 13 actions outstanding at the end of September 2022: one that had not
been started or were only partially implemented and 12 where the due date had not
yet passed. 
Agenda Item 8
101

Page 102

2.2 In addition to these 13 carried forward actions, there have been 12 new actions
agreed, giving a total of 25 action points for review. 
2.3 Services have completed 16 actions since the last report.  All Council Services are
required to retain evidence of work carried out in completing their actions and Internal
Audit carries out 'spot-checks' on a sample of completed actions on an ongoing basis. 
2.4 Of the remaining nine actions, eight were either not started or only partially complete
at 31 December 2022 and the remaining action was not due for completion until after
that date. 
2.5 Appendix 1 to this report provides the Committee with full details of the eight actions
that were not completed within the agreed timescales. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and (b) challenges
those Services that have not implemented actions within the previously agreed
timescales. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud actions
helps to support the efficient delivery of the strategic priorities within the Council Plan
2019-2024. 
102

Page 103

Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None.
103

Page 104

4
Actions due by 31st December 2022 but not started or partially complete 
Code CFT3120f Description
Audit Action: Education Service should consider routes to recover the embezzled
funds as recommended for any financial loss to the Council, through fraudulent
activity, in its Counter Fraud and Corruption Strategy. 
Audit Risk: Loss of council funds, No deterrent or consequences for wrongdoing or
breach of Council policy, procedures and regulations.  
Priority 1 Latest Note
Legal Services have advised the Service not to progress recovery until the outcome
of the court case is known, as the court may impose repayment on the subject. The
case is currently still pending at court. Next review date, as agreed with Audit, is 30
April 2023.
Progress Bar  Original Due Date 30-Apr-2022 Due Date 31-Oct-2022
Parent Code & Title CFT3120 Allegation against an Education Business Assistant (Early Years)
Managed By Lindsay Morris
Assigned To Lindsay Morris 
104

Page 105

5 
Code IA2017PA020b Description Data protection information awareness for schools training should be agreed and
implemented as soon as possible. 
Priority 1 Latest Note
There is only one school left to complete this training, which is Garnock Campus.
Sessions have been arranged at this school twice, in November 2022 and February
2023, and on both occasions these were cancelled at short notice due to trainer
availability.  The Head of Service (Democratic Services) has given a commitment that
the training will proceed at the next agreed date, which is 30th May 2023.
Progress Bar  Original Due Date 01-Jun-2018 Due Date 22-Nov-2022
Parent Code & Title IA2017PA020 Email Controls In Education
Managed By Andrew McClelland
Assigned To Susan Lauder 
Code IA2019IJB001d Description
HSCP Management should work with officers from East and South Ayrshire HSCP’s to
progress the fair share methodology at the earliest opportunity, including developing
detailed Directions with commissioning plans  
Priority 1 Latest Note
The pan Ayrshire work on Directions has recommenced and workstreams have been
agreed to take forward the elements in relation to - Integration Schemes, Set Aside, Joint
Commissioning Plans and Lead Partnership Arrangements. Expected completion date
31st March 2024.
Progress Bar  Original Due Date 31-Mar-2019 Due Date 31-Dec-2022
Parent Code & Title IA2019IJB001 IJB Lead Partnership Arrangements
Managed By Caroline Cameron
Assigned To Caroline Cameron 
105

Page 106

6
Code IA2020PA007a Description
Audit Action:  Carefirst should be considered as a storage location for holding all
relevant placement information – as a replacement to the current systems being
used. 
This would ensure that all data is held securely against each young person’s record,
whilst remaining accessible to those with appropriate system access rights. In
addition, Carefirst could be used to hold financial cost information on each placement.
This would reduce the reliance on spreadsheets. 
Audit Finding: Highly sensitive young person placement data is being kept in paper
files by Education, with no direct electronic equivalent being available. 
Risk: Data loss due to paper files not being backed up; inability to locate highly
confidential data; GDPR breaches  
Priority 1 Latest Note
We now have a secure filing system for all Psychological Service files - Fast Online
Referral Tracking (FORT) - we still need to complete archiving our paper files.
Archiving is expected to be complete by the end of June 2023. 
Progress Bar  Original Due Date 31-Dec-2019 Due Date 31-Dec-2022
Parent Code & Title IA2020PA007 External Residential and Education Placements
Managed By Caroline Amos
Assigned To Gail Nowek 
106

Page 107

7
Code IA2021PA009b Description
Audit Action: The team should liaise with the Transformation team to streamline this
part of the process and reduce the number of times the same information must be
keyed. 
Audit Finding: The admin team are required to update the budget monitoring
spreadsheet, an operational access database and the CareFirst system at each stage
of this process for all council tenant jobs. In addition, the access database is not
supported by IT Services.
Risk: Inefficient use of staff time and increased risk of keying errors.  
Priority 2 Latest Note
We are currently working with the Eclipse team to build the Community OT process
into the system.  We are hoping to capture reporting information within this process. 
Unfortunately there have to be no new developments to CareFirst therefore this will
be hopefully come into place by August 23.
We are also running our budget reports from Integra and validating the information
against our old process.  Once we are confident that this is accurate the database
and some of the fields in the spreadsheet can be reduced.  Validation will run for
approximately 3 months.
Progress Bar  Original Due Date 31-Dec-2021 Due Date 31-Dec-2022
Parent Code & Title IA2021PA009 Aids and Adaptations
Managed By David Thomson
Assigned To Lynn Kirkland  
107

Page 108

8
Code IA2022PA019b Description
Audit Action: A minimum technical standard for CCTV systems should be set for the
Council. A Council-wide audit of CCTV inventory should be carried out to assess
compliance of CCTV assets against the standards, which will give an indication of the
level of capital investment required to bring the Council’s CCTV systems up to an
appropriate standard and form the basis of a bid for capital.
An approval process should be introduced to ensure new CCTV purchases meet the
requirements of the standards.
Audit Finding: Audit were advised that there are various capital budgets in place
covering vehicles and property lifecycle investment. However, there is no formal
replacement programme for CCTV equipment.
Risk: Substandard systems that aren’t fit for the intended purpose. CCTV footage is
not available or not usable when required.  
Priority 2 Latest Note
The corporate asset register for all CCTV systems has been completed, however it is
evident that the data which has been returned by the services requires to be further
scrutinised in terms of both the DPIA’s and the physical assets reported. Work,
including cross checking with other council data sets, is underway to ensure that all
systems have been recorded and Protective Services are exploring the best method
of capturing the physical data. The options being explored for this are either
establishing an in-house team or utilising the existing the CCTV maintenance
contracts and a budget pressure bid of £40K has been submitted for 23/24 to
commence this work as soon as possible. Protective Services are, on request,
currently advising on the operational requirements for new or replacement systems to
ensure compliance for projects ongoing at the moment. This process will be finalised
and formally embedded once the quantity and quality of the physical assets has been
fully determined. The Corporate CCTV policy, published in August 2022 is being kept
under review to take account of industry best practice and developments. Work is
underway to rollout the I-Learn CCTV awareness course for those operating and
responsible for CCTV systems which is anticipated to “go-live” on 10th March 2023. 
Note that that this essentially forms phase 1 of a wider project to have fully compliant
council CCTV systems, subsequent phases being the physical asset surveys, then
the prioritised replacement/removal programme. The quantum on funding required
108

Page 109

9
will be established on completion of the physical surveys. Expected completion of
audit action by end of financial year 2023/24.  
Progress Bar  Original Due Date 30-Jun-2022 Due Date 31-Dec-2022
Parent Code & Title IA2022PA019 CCTV in Council Buildings and Vehicles
Managed By Aileen Craig
Assigned To Mark Boyd; Russell
McCutcheon 
Code IA2023PA006b(1) Description
Action Description: Services should revisit all agency staff transactions in 21/22 and
assess whether these could have fallen within the scope of IR35.  All decisions
should be evidenced, and if deemed within the scope of IR35 appropriate corrective
action should be taken.
Finding: IR35 is not being considered, evidenced, and applied consistently
throughout the Council.
Risk: Council faces fines and penalties from HMRC for not correctly applying IR35
legislation.
Priority 1 Latest Note
This has been progressing – we identified Lynne Ferguson (Business Support) and
Lee Thomson (Finance) to be the experts around IR35 and undertake the training,
who could then be a point of contact for managers who were looking at engaging
someone via an agency.  3 of the CFJ SMT have now completed the training.
New completion date: 31/3/23 
Progress Bar  Original Due Date 31-Oct-2022 Due Date 31-Oct-2022
Parent Code & Title IA2023PA006 Off Payroll Working (IR35)
Managed By Alison Sutherland
Assigned To Alison Sutherland
109

Page 110

10
Code IA2023PA006b(2) Description
Action Description: Services should revisit all agency staff transactions in 21/22 and
assess whether these could have fallen within the scope of IR35.  All decisions
should be evidenced, and if deemed within the scope of IR35 appropriate corrective
action should be taken.
Finding: IR35 is not being considered, evidenced, and applied consistently
throughout the Council.
Risk: Council faces fines and penalties from HMRC for not correctly applying IR35
legislation.
Priority 1 Latest Note
This has been progressing - we identified Lynne Ferguson (Business Support) and
Lee Thomson (Finance) to be the experts around IR35 and undertake the training,
who could then be a point of contact for managers who were looking at engaging
someone via an agency. 1 of the MH SMT has now completed the training
New completion date 31/3/23 
Progress Bar  Original Due Date 31-Oct-2022 Due Date 31-Oct-2022
Parent Code & Title IA2023PA006 Off Payroll Working (IR35)
Managed By Thelma Bowers
Assigned To Thelma Bowers 
110

Page 111

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed between January and February 2023. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed between January
and February 2023.  Internal control reviews have been completed in respect of the
areas detailed in Appendix 1 to this report. The aim of these reviews is to provide
assurance that the internal control framework within the areas examined is appropriate
and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit. 
2.3 The findings from two separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below:  
Agenda Item 9
111

Page 112

Audit Title Assurance Level
Financial Controls within ASN and Primary Schools Reasonable
Social Care Establishments Reasonable 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between January and February 2023. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
112

Page 113

Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None.  
113

Page 114

FINANCIAL CONTROLS WITHIN ASN AND PRIMARY SCHOOLS 
1 Background  
1.1 This audit was performed by requiring all schools to complete a self-assessment
questionnaire and provide supporting documentation.  Each response was
reviewed in detail and followed up as necessary.  In addition, a sample of schools
were visited to allow more detailed audit testing to be performed. 
2 Objectives and Scope  
2.1 The objective of this audit was to review financial controls within the Council’s
ASN and primary schools. 
The questionnaire and detailed testing were designed to gain assurance that:- 
• Staff are aware of all relevant Council governance procedures.
• All cash is being held securely and is being properly managed.
• Cash withdrawals made via the Procurement Card are being used for
appropriate types of expenditure, and all transactions are being properly
recorded.
• A full audit trail exists for all school fund income and expenditure
transactions.
• Processes are in place to ensure PEF spend is maximised. 
3 Findings   
Governance  
3.1 Head Teachers were asked to confirm they were aware of a number of key Council
policies and had completed a number of key training courses.  The majority of Head
Teachers gave full assurance. Those who didn’t were asked to familiarise
themselves with the policies and complete any outstanding training as soon as
possible.  
3.2 Schools were asked to confirm if all relevant officers have completed cash handling
training.  The majority of officers have, and those who haven’t are on the waiting list
for the training.  
3.3 Finally, schools were asked to confirm that all relevant officers have completed fire
warden training.  The majority of officers have completed the training.  Those who
haven’t have been directed to the Council’s online training course which is available
for immediate completion.   
Cash Holding  
3.4 A cashless catering system (iPayimpact) is in operation in all ASN and primary
schools.  Schools can also use this system to collect payments for other items such
as school trips, school uniform, fundraising etc.   
3.5 The ability to accept payments online has reduced, but not eliminated, cash in
schools.
114

Page 115

3.6 There is a risk associated with holding cash, therefore schools were asked to
confirm:-
• The arrangements in place for the safe storage of cash
• That they are aware of the maximum insurable value of cash held within the
school
• Keyholder registers are up to date.  Schools were also asked to provide
copies of these  
3.7 No issues were noted regarding cash storage locations, and schools confirmed they
were aware of insurable limits.  
3.8 Audit liaised with a number of schools to clarify and/or expand their keyholder
registers.  Updated registers have been provided by all these schools.   
GPC Cash Withdrawals  
3.9 Officers can withdraw cash using their procurement cards IF this facility has been
activated on their card.  
3.10 Only 5 schools have cardholders with this facility activated.    
3.11 Audit reviewed GPC cash expenditure from 1 April 22 to 31 December 22.  During
this period only 2 schools have used GPC cash – with transactions totalling £189.33.    
3.12 Audit reviewed the cash transactions to ensure the expenditure type seemed
reasonable – no issues were noted.  Due to the minimal volume and value of
transactions, no further detailed testing has been undertaken. 
School Funds  
3.13 Council procedures state that school fund accounts must be audited annually by an
independent party.  
3.14 These audit reports give assurance that detailed and accurate records are being
kept of school fund transactions.  
3.15 Schools must have accounts audited and a copy submitted to Education HQ by 30th
November.  As of 31 December 22, 3 schools have indicated that their accounts
have not yet been audited.  
3.16 Education HQ has confirmed that a direct instruction has been sent to those who
have failed to meet the deadline.  
3.17 During site visits it became evident that, at times, school fund expenditure is being
authorised verbally.  This means there is no audit trail available to confirm
who/when/if expenditure has been approved.  
3.18 Audit has spoken directly to the Head Teachers in the schools where this issue was
witnessed. (action point a)   
Inventory
115

Page 116

3.19 The Council’s Inventory procedure states that all establishments must maintain
detailed inventory records which are updated throughout the year to reflect
purchases, disposals and movements of assets.  Updates should not be restricted to
annually for the year end.  
3.20 Head Teachers complete an ‘Annual Inventory Certificate’ in which they confirm that
inventories are being maintained on a continuous basis.  Whilst Head Teachers were
instructed to return a copy of this certificate to Education HQ, not all complied.
(action point b)  
3.21 In addition to ensuring compliance with Council procedures, detailed inventory
records are essential for Insurance purposes – in order to prove an item is an
‘insurable asset’ it must be recorded on an establishment’s inventory record.    
3.22 Schools were asked to confirm the date that their inventories were last updated and
provide copies of all detailed inventory records.  
3.23 The information supplied highlighted that not all schools have updated their
inventories recently – with several quoting 2021 for the last update. (action point c)  
3.24 Audit noted that the level of detail being recorded for IT assets varies between
schools.  Not all IT records are sufficiently detailed to allow specific assets to be
clearly identified. (action point d)   
PEF  
3.25 Head Teachers are responsible for PEF spend.  
3.26 Audit obtained copies of the monthly PEF monitoring reports provided by Education
HQ to support Head Teachers in this role.    
3.27 These reports contain detailed staffing projections along with information on all other
actual spend to date.   
3.28 Audit deemed these reports sufficient to support Head Teachers. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard the areas of financial
control reviewed during the Audit. 
116

Page 117

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
117

Page 118

KEY FINDINGS AND ACTION PLAN
FINANCIAL CONTROLS WITHIN ASN AND PRIMARY SCHOOLS 
Action a
Finding Incomplete audit trail for school fund transactions.
Action Description Education HQ to remind all Head Teachers/Heads of Centres
of the importance of ensuring a detailed audit trail is available
for all school/early years fund transactions. 
There should always be clear written evidence of a
transaction having been authorised.
Risk Misappropriation of school funds; failure to comply with the
Council’s school funds procedures
Priority (1, 2, 3) 2
Paragraph Reference  3.18
Managed by Andrew Mcclelland, Head of Service
Assigned to Lynn Taylor, Senior Manager
Due Date 31 March 2023
Management Comment A reminder will be issued by the Head of Service to remind all
Head Teachers/Heads of Centres of the importance of
ensuring a detailed audit trail is available for all school fund
transactions. 
Action b
Finding The Council’s Inventory Procedure requires establishments to
submit signed copies of Annual Inventory Certificates to
Headquarters. 
These certificates then support the completion of the Annual
Composite Certificate for the Service. 
Whilst Primary School Head Teachers are completing the
Annual Certificates and retaining these on site, they are not
being required to submit these to Education HQ.
Action Description All Head Teachers should be instructed to submit signed
Annual Inventory Certificates to a nominated Education HQ
officer. 
This officer should ensure all schools submit returns
timeously.
Risk Non-compliance with Council Procedures
Priority (1, 2, 3) 2
Paragraph Reference  3.20
Managed by Andrew Mcclelland, Head of Service
Assigned to Lynn Taylor, Senior Manager
Due Date 31 March 2023
Management Comment A communication will be issued by the Head of Service to
remind Head Teacher/Heads of Centres to submit signed
Annual Inventory Certificates to a nominated Education HQ
officer. 
HQ will ensure all schools submit returns timeously.
118

Page 119

Action c
Finding Not all school inventories have been updated recently.
Action Description Education HQ to remind all Head Teachers of the importance
of updating inventory records as soon as a change in assets
occurs.  This ensures that the inventory remains an exact
reflection of every asset within the school. 
Regular spot checks should be undertaken by Education HQ
to ensure that inventory records are being maintained.  This
ensures all records are sufficient to support an Insurance
claim if required, but also ensures that Annual Inventory
Certificates are accurate.
Risk Loss or theft of assets going unnoticed due to schools losing
track of the movement of assets; insufficient records to make
a claim against the Council’s insurance policy.
Priority (1, 2, 3) 2
Paragraph Reference  3.23
Managed by Andrew Mcclelland, Head of Service
Assigned to Lynn Taylor, Senior Manager 
Due Date 31 March 2023
Management Comment A communication from the HOS will be sent to remind all
Head Teachers/Heads of Centres of the importance of
updating inventory records as soon as a change in assets
occurs.  This ensures that the inventory remains an exact
reflection of every asset within the school. 
Head Teachers/Heads of Centres will also be reminded of the
need for their establishment responsible officer to carry out
random, period checks of the inventory records.  This will
ensure all records are sufficient to support an Insurance claim
if required, but will also ensure that Annual Inventory
Certificates are accurate. 
119

Page 120

Action d
Finding Not all IT inventories contain sufficient information to allow
specific assets to be clearly identified.
Action Description Education HQ to remind all Head Teachers of the minimum
level of detail required to be included in all inventories, but in
particular IT inventories. 
Consideration should be given to providing templates for
schools to record inventories on.  This would ensure a
consistent approach with all schools recording the same level
of information for each category of asset.
Risk Loss or theft of assets going unnoticed due to schools losing
track of the movement of assets; insufficient records to make
a claim against the Council’s insurance policy.
Priority (1, 2, 3) 1
Paragraph Reference  3.24
Managed by Andrew Mcclelland, Head of Service
Assigned to Lynn Taylor, Senior Manager
Due Date 31 March 2023
Management Comment A communication will be sent to remind all Head
Teachers/Heads of Centre of the Inventory Template Forms
(IRF1) and (IRF2) that require to be maintained to provide
relevant details of all assets located within establishments. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
120

Page 121

SOCIAL CARE ESTABLISHMENTS 
1 Background  
1.1 This audit was conducted as part of the approved 2022/23 Internal Audit Plan and
reviewed financial and other controls within a sample of operational
establishments within the Health and Social Care Partnership (HSCP).  Five
HSCP establishments were visited as part of this audit namely, one of the
Children’s Houses, a Day Care and Resource Centre, Community Based
Services, a residential Care Home and an Area Team. 
1.2 Questionnaires were issued to 31 establishments providing a wider perspective of
financial and other controls. 
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure:
• All cash and income is properly accounted for and held securely;
• Income and expenditure relating to independent funds is recorded in line
with procedures;
• Petty cash purchases are valid, authorised and properly accounted for in
line with procedures;
• Service User accounts are properly accounted for in accordance with
departmental policy;
• Purchases made via procurement card or E-procurement are valid,
authorised and administered in line with procedures; 
• Staff are complying with the Council’s Financial Regulations and other
financial instructions;
• Asset management is properly conducted and administered in line with
procedures. 
3 Findings  
Policy and Procedures  
3.1 Policy-related questionnaire responses indicated a general awareness of key
financial and IT policies. This was confirmed at all locations visited. 
3.2 Questionnaire responses relating to awareness of contract policies, highlighted
gaps in awareness of the maximum amount of cash which may be held on their
premises, and attendance at the Council’s training courses on both financial
regulations and cash handling. This is reflective of considerable pressures
experienced by the service provision and change of management within individual
establishments.  (action a) 
Cash Holding and Security 
3.3 Two questionnaire responders confirmed that they had no cash on the premises,
other responses confirmed different sources of money were held separately and
access was restricted to those who had legitimate need. The typical amounts of
cash per premises ranged from £100 to £6,000 depending on client requirements.
121

Page 122

3.4 Site visits confirmed that cash was kept in a secure location with access restricted
to only those responsible for cash. Different funds were locked in separate cash
tins and client funds were kept in separate pouches. 
Cash Handling 
3.5 Depending on the site, cash reconciliations were completed on shift changeover,
or in offices which had no shift handover daily. 
3.6 A complete cash check of petty cash and client cash was carried out in each of
the establishments visited. No discrepancies were identified. 
3.7 Petty cash purchases were recorded on a Microsoft Excel template in 3 of the
establishments visited and on a manual card for 2 of the sites visited. In each
establishment, petty cash purchases were audited and confirmed to be accurately
recorded and valid with supporting receipts. 
3.8 One establishment visited provided shop vouchers for clients. These were
properly secured and accounted for.  
3.9 All third-party funds were accurately recorded and individually stored in individual
envelopes or pouches. In one establishment visited, staff reported a concern with
handing clients funds in a busy reception area. (action b)  
3.10 No bank books were located within the establishments visited. 
Inventories 
3.11 The questionnaire responses indicated that 16 establishments did not have an
up-to-date inventory. Lists of items under warranty are maintained by 4
establishments. Site visits confirmed that 2 establishments had up-to-date
inventory lists and the other 3 had inventories but had not kept them up-to-date.
(action c) 
GPC Cards 
3.12 All cards were reported to be secure in the questionnaire which was confirmed at
the site visits. 
3.13  All the cash handling establishments reported in the questionnaire that they used
the GPC card for withdrawing cash. Site visits confirmed the process for
collecting cash was carried out in a secure manner, including an irregular pattern. 
3.14 A random sample of GPC card transactions for each of the establishments visited
was tested for procurement compliance. No issues were identified.   
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to security and handling
cash.
122

Page 123

4.2 Lack of policy knowledge and attendance at financial and cash training courses is
reflective of change of managers and newness of some establishments. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
123

Page 124

KEY FINDINGS AND ACTION PLAN
SOCIAL CARE ESTABLISHMENTS 
Action a
Finding Not all managers have completed financial procedure and
cash handling training.
Action Description In light of current pressures, a guidance booklet be
established to provide guidance to new managers and a long-
term training strategy be established which ensure training is
completed in line with HSCP’s operational needs.
Risk Managers are unaware of their responsibilities and processes
become localised and inconsistent with NAC corporate policy. 
Priority (1, 2, 3) 1
Paragraph Reference  3.2
Managed by Julie Davis, Principal Manager (Business Administration)
Assigned to Lynne Ferguson, Business Admin Manager
Due Date 31/05/2023
Management Comment We will implement a process to ensure that all relevant staff
undertake financial regulations and cash handling training
where appropriate. This will involve running reports from the
e-learning system on a regular basis and liaising with senior
managers to ensure their staff complete the training. 
Action b
Finding Clients’ cash is distributed in a public domain 
Action Description In establishments where client cash is being distributed an
independent review of locations used is completed and a
procedure established.
Risk The potential risk of targeted fraud or theft.
Priority (1, 2, 3) 1
Paragraph Reference  3.9
Managed by Julie Davis, Principal Manager (Business Administration)
Assigned to June Mclennan, Centre Co-ordinator
Due Date Complete
Management Comment This has now been addressed at the location which was
visited by Internal Audit and a closed office has been
allocated for the distribution of cash to clients. At other
locations, cash is handled either behind screens or in a
closed office. 
124

Page 125

Action c
Finding Asset inventories are incomplete and not maintained to reflect
current estate.
Action Description Asset registers are to be brought up to date.
Risk Items are not properly valued, new items are not registered
and missing assets not identified.  Assets are not covered by
the Council’s insurance policy.
Priority (1, 2, 3) 1
Paragraph Reference  3.11
Managed by Julie Davis, Principal Manager (Business Administration)
Assigned to Julie Davis, Principal Manager (Business Administration)
Due Date 30/04/2023
Management Comment An email has been sent to all establishments instructing them
to bring their inventories up-to-date and this will be completed
and checked in line with financial year-end requirements. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
125

Page 126

126

Page 127

NORTH AYRSHIRE COUNCIL 
28 March 2023 
Audit and Scrutiny Committee 
Title:    Internal Audit Charter 2023 
Purpose:  To seek Committee approval of the updated Internal Audit
Charter. 
Recommendation:  That the Committee (a) approves the Internal Audit Charter
attached at Appendix 1 and (b) agrees that future
amendments to the Charter will be made where a need is
identified. 
1. Executive Summary 
1.1 Internal Audit operates in accordance with the requirements of the 'Public
Sector Internal Audit Standards (PSIAS)'. The Standards are designed to
ensure that common practices are followed across all public sector bodies. 
1.2 One requirement of the PSIAS is the preparation of an 'Internal Audit Charter'
which must be approved by the Audit and Scrutiny Committee. 
1.3 In May 2014 it was agreed that the Charter would be reviewed on a biennial
basis or at any other time if required by a material change to the terms of the
Charter. 
1.4 The existing Internal Audit Charter was approved by the Audit and Scrutiny
Committee in September 2020.  A revised Charter is attached at Appendix 1 for
approval. 
2. Background 
2.1 The Charter is a formal document that defines the purpose, authority and
responsibility of Internal Audit; the section's position within the organisation;
authorises access to records, personnel and physical properties relevant to the
performance of audit engagements; and defines the scope of Internal Audit
activities. 
2.2 It was agreed by the former Audit Committee that the Charter should be
reviewed on a biennial basis to ensure it remains current and brought to
Agenda Item 10
127

Page 128

Committee for approval. It is now proposed that an annual review of the Charter
will continue to be carried out by the Senior Manager as this is a requirement of
the PSIAS, however only where material changes occur would this result in a
change to the Charter and require reapproval by Committee.  Examples of such
circumstances would include: changes to internal structures or arrangements,
findings from an internal or external quality assessment, or changes to the
standards or guidance around internal audit charters or the requirements of
internal audit. 
2.3 The Internal Audit Charter has been reviewed and found to remain fit for
purpose. 
2.4 Minor changes have been required to the Charter to ensure it continues to reflect
the organisational structure of the Council and the requirements of the PSIAS: 
• Updates throughout the document to reflect changes to designations; and
• Definition of the mission of Internal Audit, which was a recommendation
raised by the external review team as part of the external quality
assessment. 
3. Proposals 
3.1 It is proposed that the Committee (a) approves the Internal Audit Charter
attached at Appendix 1 and (b) agrees that future amendments to the Charter
will be made where a need is identified. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
128

Page 129

Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultations have been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud,
Safety and Risk), on 01294 324524. 
Background Papers
None. 
129

Page 130

INTERNAL AUDIT CHARTER 
2023 
Version: Final
Date: 28/03/2023
Author: Laura Miller
Classification: Public 
130

Page 131

INTERNAL AUDIT CHARTER
2023 
1 Introduction  
1.1 North Ayrshire Council has adopted the definition of Internal Audit as given
in the Public Sector Internal Audit Standards (PSIAS):   
‘Internal Auditing is an independent, objective assurance and consulting
activity designed to add value and improve an organisation’s operations. It
helps an organisation accomplish its objectives by bringing a systematic,
disciplined approach to evaluate and improve the effectiveness of risk
management, control and governance processes.’  
1.2 PSIAS requires the Council to define its interpretation of the generic terms
‘Chief Audit Executive’, ‘Senior Management’ and ‘Board’.  
1.3 For the purposes of this Internal Audit Charter, the role of the ‘Chief Audit
Executive’ is fulfilled by the Senior Manager (Audit, Fraud, Safety & Risk),
hereafter referred to as the Senior Manager; the Chief Officers are defined
as ‘Senior Management’ and the ‘Board’ is deemed to be the Audit and
Scrutiny Committee.  
2 Responsibilities of Internal Audit  
2.1 The mission of internal audit is to enhance and protect organisational value
by providing risk-based and objective assurance, advice and insight.  
2.2 The scope of Internal Audit activity includes, but is not limited to, the
examination and evaluation of the adequacy and effectiveness of the
organisation’s governance, risk management and internal control
processes. This enables Internal Audit to provide the Audit and Scrutiny
Committee with assurance on the adequacy of these arrangements.  
2.3 Internal Audit does this by: 
• Providing high quality, independent audit services to the Council and
its Senior Management;
• Performing a systematic and continuous review of the Council’s
internal control, risk management and governance arrangements in
accordance with a risk-based annual plan approved by the Audit and
Scrutiny Committee;
• Highlighting opportunities to reduce costs through greater economy,
efficiency and effectiveness within existing internal controls
throughout the Council’s systems and activities;
• Advising on cost effective controls for new systems and activities;
• Providing an assurance statement and annual report to the Audit and
Scrutiny Committee on the adequacy of the Council’s internal control
and governance arrangements.  
131

Page 132

2.4 Internal Audit is responsible for reporting risk exposures and control risks to
the Audit and Scrutiny Committee and Senior Management.  
2.5 Internal Audit will consult with the Council’s external auditor and with other
relevant inspection and review bodies in order to co-ordinate effort and
avoid duplication.  
3 Standards and Ethics  
3.1 Internal Audit will carry out its work in accordance with: 
• Relevant standards and guidelines issued by the Chartered Institute
of Public Finance and Accountancy (CIPFA) and the Institute of
Internal Auditors (IIA);
• The Council’s ‘Local Code of Corporate Governance’;
• The section’s own Internal Audit Manual and Procedures.  
3.2 In particular, Internal Audit will adhere to the Public Sector Internal Audit
Standards (PSIAS) which were issued by CIPFA and the IIA and were most
recently updated in April 2017. The PSIAS incorporates the mandatory
elements of the IIA’s International Professional Practices Framework – the
definition of Internal Auditing (see 1.1 above), the Code of Ethics and the
International Standards for the Professional Practice of Internal Auditing.  
3.3 Internal Auditors will comply with appropriate professional ethics at all times.
These cover: 
• Integrity;
• Objectivity;
• Confidentiality;
• Competency.  
3.4 The Chief Audit Executive will hold a relevant professional qualification and
will be suitably experienced. Audit staff will adhere to the requirements of
the Council’s Employee Code of Conduct, the Seven Principles of Public
Life and the ethical standards of any professional institute of which they may
be a member. Staff will undertake Continuing Professional Development
(CPD) as required and will also keep their skills and knowledge current
through appropriate professional learning and the Council’s employee
development programme.  
4 Position of Internal Audit within the Council  
4.1 Internal Audit is an independent activity. It is not an extension of, or a
substitute for, the functions of line management and must remain free from
any undue influence or other pressure affecting its actions and reporting.  
4.2 At all times, the responsibilities of Senior Management across the Council
include: 
132

Page 133

• Maintaining proper internal controls in all processes for which they
have responsibility to ensure probity in systems and operations;
• Preventing and detecting fraud and irregularities within their service
areas and reporting any suspicions to the Senior Manager;
• Co-operating fully with Internal Audit to help ensure that Internal
Audit can properly fulfil its role;
• Considering and acting on Internal Audit findings and
recommendations or accepting responsibility for any resultant risk
from not doing so.  
4.3 In terms of the PSIAS, the status of Internal Audit should enable it to
function effectively, with recognition of the independence of the section
fundamental to its effectiveness. The Chief Audit Executive should have
sufficient status to facilitate the effective discussion of audit strategies,
plans, results and improvement plans with Senior Management.  
4.4 Within North Ayrshire Council, the Senior Manager will have unrestricted
access to the Section 95 Officer, the Monitoring Officer (the Head of
Democratic Services), the Chief Executive and the Chair of the Audit and
Scrutiny Committee.  
4.5 In addition, unrestricted access to all Chief Officers and employees of the
Council is afforded to the Senior Manager and all members of Internal Audit
staff in the course of carrying out their work.  
4.6 In terms of accountability and independence, the Senior Manager reports
functionally to the Audit and Scrutiny Committee; this means the Audit and
Scrutiny Committee will: 
• Approve the Internal Audit Charter;
• Approve the internal audit plan;
• Receive reports from the Senior Manager on the outcome of Internal
Audit work and any other matters the Senior Manager deems
necessary;
• Make enquiries to ensure that Internal Audit is adequately resourced
to meet its assurance and other key responsibilities;
• Receive periodic confirmation from the Senior Manager that Internal
Audit complies with the requirements of PSIAS.  
4.7 The Senior Manager reports administratively to the Section 95 Officer (the
Head of Service (Finance)). The administrative reporting line will be
managed in a manner that ensures: 
• The Senior Manager is accorded open and direct communication with
Senior Management across the Council;
• The Internal Audit function has an adequate and timely flow of
information concerning the activities, plans and initiatives of the
Council.  
133

Page 134

4.8 It is recognised that the administrative reporting line does not have authority
over the scope of reporting of results of Internal Audit activity. Ultimate
authority in this regard rests with the Senior Manager, who retains the final
right of edit over all Internal Audit reports.  
4.9 The Senior Manager also has managerial responsibility for the Council-wide
functions of risk management, insurance, business continuity planning and
health and safety. In order to ensure that Internal Audit independence and
objectivity is maintained, any audit work in these areas will be carried out by
other Internal Audit staff with the Senior Manager as the client. The Senior
Manager will have no involvement in the delivery or reporting of the audit
review and the report will be published by the Team Manager (Internal
Audit). 
5 Rights of Access  
5.1 In relation to audit work being carried out, the Senior Manager and any
member of the Internal Audit section has the authority to:
• Enter at all reasonable times and without notice any premises or land
of the Council, provided that where such premises or land are leased
to a third party the terms of the lease are observed;
• Have access to, and remove, all records (both paper and electronic),
documents and correspondence within the possession or control of
any officer of the Council, relating to any financial or other matters of
the Council;
• Be provided with a separate log-in to any computer system within the
Council and have full access to any system, network, personal
computer or other device in the ownership of the Council;
• Require and receive explanations concerning any matter under
examination from any employee, including Chief Officers, and
request such explanations from any Elected Member;
• Require any employee of the Council to produce cash, stores or any
other Council assets under their control.  
5.2 These rights of access are also embedded within the Council’s Financial
Regulations, which were last approved by the Council on 16th December
2020.  
6 Fraud-related Work  
6.1 As outlined at 4.2 above, responsibility for the prevention and detection of
fraud lies primarily with Senior Management across the Council, not with
Internal Audit. However, Internal Audit staff will be alert in all their work to
risks and exposures that could allow fraud or corruption. The Corporate
Fraud Team will also undertake proactive work to identify potentially
fraudulent activity.  
6.2 The Council’s ‘Defalcation Procedures’ require that any suspected fraud
against the Council will be reported to the Senior Manager.  
134

Page 135

6.3 The Corporate Fraud Team will investigate suspected instances of fraud
against the Council and report their findings to Senior Management, along
with any recommendations for action to rectify the situation. This may
include the recommendation that Senior Management should consider
investigating relevant members of staff under the Council’s Disciplinary
Policy.  
6.4 Senior Management will be responsible for acting on the recommendations
of Internal Audit, including carrying out any disciplinary reviews.  
6.5 Any contact with the Police or the Procurator Fiscal in relation to employee
fraud will be made only by the Chief Executive or by another officer acting
with the prior approval of the Chief Executive. 
7 Consultancy Work  
7.1 When invited by Senior Management, Internal Audit may provide advice and
consultancy services on: 
• Cost effective controls for new systems and activities;
• Opportunities to reduce costs through greater economy and efficiency
within processes or systems.  
7.2 Acceptance of any assignment will be dependent on available resources,
the nature of the assignment and any potential impact on future independent
assurances.  
7.3 Internal Audit will not accept any consultancy assignment where the Senior
Manager considers that staff do not have the necessary specialist
knowledge or skills.  
7.4 The role of Internal Audit in a consultancy assignment is to provide advice
and support to Senior Management, who retain the ultimate responsibility for
the decisions taken within the area under review.  
7.5 Internal Audit may in future carry out assurance work in service areas where
advice or consultancy services were previously provided. The objectivity of
individual audit staff will be managed in assigning any such assurance work.  
8 Audit Reporting  
8.1 After the completion of each assignment, Internal Audit will issue a draft
report to the relevant Head of Service, containing the findings of the audit
work, an action plan and an audit opinion on the area under review. Internal
Audit will aim to issue this draft report within 21 days of completion of the
audit fieldwork.  
8.2 Senior Management is expected to respond to Internal Audit with a
completed action plan within 21 days of the issue of the draft report. A
clearance meeting will be offered to the Head of Service during the 21 day
135

Page 136

period if they wish to discuss the findings and facilitate the completion of the
action plan.  
8.3 Following the return of the completed action plan, Internal Audit will aim to
finalise and publish the report within 14 days.  
8.4 Each final Internal Audit report will be issued to the relevant Executive
Director and Heads of Service. Copies will also be made available to the
Chief Executive and the Section 95 Officer.  
8.5 Once finalised, each Internal Audit report and action plan will be submitted
to the Audit and Scrutiny Committee.  
8.6 Internal Audit recognises that its responsibility does not cease at the point
when a report is published. Regular follow-up work will be carried out to
ensure that actions are in place and are effective.  
8.7 Failure by Senior Management to implement actions within the previously
agreed timescales will be reported to the Audit and Scrutiny Committee at
the first meeting following the end of the quarter in which the action was due
to be implemented.  
8.8 The Audit and Scrutiny Committee may call for explanations from Senior
Management around actions that have not been implemented and will have
responsibility for agreeing any extensions to timescales.  
8.9 The Senior Manager will prepare an annual report to the Audit and Scrutiny
Committee, confirming compliance with PSIAS, highlighting key findings
from audit work during the preceding audit year, and providing an opinion on
the internal control environment of the Council.  
8.10 The work of Internal Audit, including the opinion on the control environment,
will contribute to the Council’s review of its corporate governance
arrangements, the outcome of which will be published in the Annual
Governance Statement.  
9 Audit Resources and Prioritisation of Work  
9.1 Work will be prioritised according to risk, through the judgement of the
Senior Manager, and aligned to the Council’s risk registers. The Senior
Manager will consult with the Executive Leadership Team in making this
assessment.  
9.2 The Senior Manager will determine the actual deployment of available
resources and will do so within the framework of risk prioritisation used to
prepare the annual audit plan approved by the Audit and Scrutiny
Committee.  
9.3 The audit plan will have within it a provision of resources to address
unplanned work. These resources will be directed towards responding to
136

Page 137

specific control issues highlighted by Senior Management during the audit
year.  
9.4 In the event that the risk assessment within the audit plan identifies a need
for more audit work than there are resources available, the Senior Manager
will identify the shortfall and initially advise the Section 95 Officer followed by
the Audit and Scrutiny Committee as required.  
9.5 It will be for the Audit and Scrutiny Committee to decide whether to accept
the risks associated with the non-delivery of sufficient audit work or to
recommend to the Council that it identifies additional resources. 
10 Quality Assurance  
10.1 The Senior Manager will develop and maintain a Quality Assurance and
Improvement Programme that covers all aspects of the Internal Audit
activity. This will include both internal and external assessments.  
10.2 The internal assessments will include: 
• Ongoing monitoring of the performance of Internal Audit through the
use of performance indicators, staff supervision and team meetings;
• Periodic self-assessment of the Internal Audit function against the
requirements of the Public Sector Internal Audit Standards (PSIAS).  
10.3 External assessments will be conducted at least once every 5 years by a
qualified, independent assessor from outside the organisation.  
10.4 The external assessment may be a full external assessment or a self-
assessment with independent validation. The format will be agreed in
advance of each external assessment by the Section 95 Officer and the
Audit and Scrutiny Committee.  
10.5 The findings of each internal and external assessment will be reported to the
Audit and Scrutiny Committee along with a plan for any improvement action
that may be required.  
11 Approval of the Audit Charter  
11.1 This Internal Audit Charter was reported to and approved by the Audit and
Scrutiny Committee of North Ayrshire Council on 28th March 2023.  
11.2 The Charter will be subject to annual review by the Senior Manager. Where
any material changes are required to the Charter, this will be presented to
the Audit and Scrutiny Committee for their approval.   