Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Tuesday, 31 January 2023 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 15 November 2022 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Elected Member Service Requests
Submit report by the Head of Democratic Services on the Elected
Member constituent services request process (copy enclosed). 
4 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between November and December 2022 (copy
enclosed). 
5 Urgent Items
Any other items which the Chair considers to be urgent.
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
6 Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
7 Internal Audit Report Issued (exempted item)
Submit report by the Head of Service (Finance) on the findings of an
Internal Audit review completed in November 2022 (copy enclosed).  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Ian Murdoch
John Sweeney 
Chair: 
Apologies: 
Attending: 
3

Page 4

4

Page 5

Audit and Scrutiny Committee
15 November 2022 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Matthew McLean, Davina McTiernan and
John Sweeney. 
Present (Remote Participation)
Tom Marshall. 
In Attendance (Physical Participation)
R. McCutcheon, Executive Director, Y. Baulk, D. Hammond, T. Reaney and C.
McAuley, Heads of Service, C. Dempster, Senior Manager and M. McNeil, Manager
(Place); Caroline Cameron, Director, and K. Logan, Senior Manager (HSCP); A.
McClelland and R. Arthur, Heads of Service (Communities); M. Boyd, F. Walker, and
A. Craig, Heads of Service, D. Forbes, L. Miller, and J. Hamilton, Senior Managers,
D. McCaw and H. Clancy, Committee Services Officers (Chief Executive’s Service). 
Also in Attendance (Physical Participation)
T. Biondi and G. Milliken (Petitioners, Kilwinning) and W Frew (Petitioner, Irvine). 
Also in Attendance (Remote Participation)
P. Kenny (Deloitte) and G. Houston (Petitioner, Saltcoats). 
Chair
Councillor Bell in the Chair. 
Apologies
Cameron Inglis and Ian Murdoch. 
1. Chair’s Remarks 
The Chair agreed, in terms of Standing Order 10.8, that two further petitions, on
Proposed Car Parking Charges: East Road, Kirkgate and West Road, Irvine and
Proposed Car Parking Charges: Saltcoats Town Centre and Surrounding Areas be
considered as urgent items and, in terms of Standing Order 10.5, further agreed to
vary the order of business to allow the urgent items to be considered at Agenda Item
4 (Petition: Proposed Car Parking Charges: Owenward East and Almswall Road Car
Parks, Kilwinning) as the terms of both Petitions were the same in essence as the
Kilwinning Petition. 
2. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
Agenda Item 2
5

Page 6

3. Minutes 
The Minutes of the Meeting of the Audit and Scrutiny Committee held on 27
September 2022 were confirmed and the Minutes signed in accordance with
Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland) Act 1973. 
4. Annual Report on the 2021/22 Audit 
Submitted report by the Head of Finance on the Annual Audit report for 2021/22 and
receive verbal report by the external auditor.  Appendix 1 to the report detailed
letters of representation to be signed by the Head of Finance as the responsible
officer for North Ayrshire Council. The External Auditor’s report, which summarised
the findings of their audit, was attached as Appendix 2 to the report. 
Pat Kenny of Deloitte provided a verbal report on the appendices to the report,
including highlighting quality indicators in terms of the impact on the execution of
their audit and also the two significant risk areas namely (1) Recognition of Covid-19
Related Income, and (2) Management Override of Controls which were both “green”
and satisfactory. 
The Committee agreed to (a) note the findings of the 2021/22 audit of the financial
statements as contained in the External Auditor’s annual report at Appendix 2; (b)
note the agreed Action Plan as outlined on Page 30 of the Final Report; and (c)
approve the audited Annual Accounts for signature. 
5. Accounts Commission’s Report: Scotland’s Financial Response to 
Covid-19  
Submitted a report by the Head of Service (Finance) on the findings of the recently
published Accounts Commission report.  A link to the full report was provided within
the Executive Summary which reflected on the impact of the Covid-19 pandemic on
the Scottish Government, Councils and other public sector bodies including fiscal
context in which these bodies operated and the ongoing development and
implementation of plans for financial recovery.   
Members asked a question and were provided with further information in relation to
processing and conditions concerning the allocation of business grants. 
The Committee agreed to note (i) the findings of the Accounts Commission report;
(ii) the recommendations contained in the report; and (iii) North Ayrshire’s approach
in relation to the recommendations. 
6. Year End Performance Reporting: Council Plan Year End Progress
Report 2021-22, Annual Performance Report 2021-22 and Local
Government Benchmarking Framework (LGBF) Report 2020-21  
Submitted report and received a presentation by the Head of Service (Democratic)
on progress with the Council Plan priorities.  The Council Plan Year End Progress
Report and supporting performance measures were set out in Appendices 1, 2 and
3 to the report.  Appendix 4 to the report detailed the Council Plan Annual
6

Page 7

Performance Report while Appendix 5 detailed the status of the Council’s
performance indicators within the 2020-21 LGBF. 
The Committee agreed to note (i) the Council Plan year End Progress Report and
supporting performance measures as set out at Appendices 1,2 and 3 to the report;
(ii) the Council Plan Annual Performance Report as set out at Appendix 4 to the
report; and (iii) the status of the Council’s performance indicators within the 2020-21
LGBF report as set out at Appendix 5 to the report. 
7. Petitions: Proposed Car Parking Charges 
Submitted three reports by the Head of Service (Democratic) on the terms of
petitions received in respect of car parking charges at (i) Oxenward East and
Almswall Road Car Parks, Kilwinning and requesting that the Council maintain free
parking in Kilwinning; (ii) East Road, Kirkgate and West Road, Irvine and requesting
that the Council maintain free parking in Irvine; and (iii) Saltcoats Town Centre and
surrounding areas and requesting that the Council maintain free parking in
Saltcoats. The reports outlined full details of each petition. 
The Head of Service Democratic) outlined the process for consideration of the
petitions, whereby each petition would be taken in turn, with petitioners allocated ten
minutes each to address the Committee and answer any questions.  The Head of
Service (Commercial) would then address the Committee in response to the three
petitions. 
(i) Owenward East and Almswall Road Car Parks, Kilwinning 
The principal spokespersons, Tom Biondi and Graham Milliken, outlined the
objections to the proposed car parking charges from shopkeepers and local
residents and highlighted various matters, including the following:- 
• the total number of signatures having risen to more than 2,900 written and
1,933 online;
• North Ayrshire’s Fair for All vision in terms of working together, engaging and
supporting local communities;
• the Town Centre Parking Strategy 2014-2020, which stated that parking would
be free;
• the lack of consultation on the introduction of parking charges;
• the creation of inequality, with parking charges not applicable for all towns in
North Ayrshire;
• the impact on local business income in Kilwinning;
• that Kilwinning and its surrounding areas were identified as a significant area of
deprivation within the Scottish Index of Multiple Deprivation;
• the ongoing struggle of local businesses and residents in terms of the cost-of-
living crisis and recovery from the Covid-19 pandemic; and
• existing customers having stated they would shop elsewhere if charges were to
be introduced. 
The spokespersons gave examples of how local residents would be affected by the
introduction of parking charges.
7

Page 8

The Committee then proceeded to hear the terms of the second petition. 
(ii)  East Road, Kirkgate and West Road, Irvine 
The principal spokesperson, William Frew, outlined the objections to the proposed
car parking charges from shopkeepers and local residents and highlighted various
matters, including the following:- 
• the ongoing struggle for small local businesses in the area;
• the disruption and lost business arising from the recent regeneration of the high
street area;
• the slow recovery for businesses following the Covid-19 pandemic;
• hardship in relation to the cost-of-living crisis;
• the increase in overheads for businesses;
• the unfair advantage to larger shops with free parking areas if charges were
introduced elsewhere in the town;
• the demise of the Kilmarnock and Ayr Town Centres following the introduction
of pay-and-display parking charges; and
• the lack of consultation with regard to the introduction of the parking charges. 
The Committee then proceeded to hear the terms of the third petition. 
(iii)  Saltcoats Town Centre and Surrounding Areas 
The principal spokesperson, Gerard Houston, outlined the objections to the
proposed car parking charges from shopkeepers and local residents and highlighted
various matters, including the following:- 
• the total number of written signatures having risen to more than 4000;
• the effect of the Covid-19 pandemic and the cost-of-living crisis on local
businesses;
• that access to short stay parking/pick ups would be essential to keep small
businesses running;
• that independent family-run businesses would be affected by the parking
charges and not larger businesses;
• the reliance on the car parks for staff parking, when staff were also struggling
with cost-of-living rises;
• the potential for encouraging parking in residential areas, which would cause
additional difficulties in the town;
• existing restrictions in Dockhead Street, Saltcoats and the extension of the
restricted vehicular access between 10am and 4pm, which already affected
footfall for local businesses; and
• the lack of consultation with local traders and the general public. 
The spokesperson provided details regarding a meeting to be held in the Argyle
Centre, Saltcoats for the general public and traders, with invitations being extended
to all local Councillors and MPs. 
8

Page 9

Members asked questions of all spokespersons and received responses in relation
to:- 
• the initial proposal approved in 2019 which was delayed due to the Covid-19
pandemic;
• the number of car parks in the local areas which were already short-stay and
time-limited; and
• whether petitioners considered that penalties should be imposed on those who
parked all day in short stay car parks or whether there should be no limitation
on any car park. 
Spokesperson responses additionally mentioned Kirkgate, Irvine parking being
utilised for school pickups, the use of the East Road car park, Irvine, for the Portal
and the view that the College in Kilwinning should have more adequate parking
provision for their specific use on campus. 
A briefing note by the Head of Service (Commercial) was detailed at Appendix 1 to
the report.  This provided background information on Decriminalised Parking
Enforcement (DPE) and the proposed introduction of car parking charges, a key
outcome of which would be improved regulation of traffic in town centres by directing
long-stay patrons to free parking slightly further out while providing chargeable and
short-stay parking close to retail and other town centre services.  The proposals
would also encourage alternative more active and sustainable modes of transport
and aimed to reduce the volume of traffic travelling through town centres by
facilitating the use of public transport.  Information was also provided in relation to
movement within car parks, where parking charges would help with vehicle turnover,
use of disabled parking bays, and the ban on pavement parking to be introduced in
late 2023. 
The Council meeting, at its meeting on 21 September 2022, agreed that, in the light
of the deepening financial crisis, a proposal be brought back to Cabinet to reconsider
the level of charges proposed in the 2022/23 budget.  This report would be submitted
to Cabinet in January 2023, following Elected Member Engagement Sessions in
December 2022. 
Members asked questions of the Head of Service (Commercial) in relation to:- 
• previous methods of consultation with Elected Members on charges to be
applied;
• the location of the one-hour free parking in Kilwinning where a response would
be provided to Members;
• monitoring of car park usage where charges were to be applied;
• Elected Member engagement sessions which would include information on
resident parking permit requirements;
• the feasibility study model and assumptions around fines and collection rates;
• the estimated costs in connection with Wardens (in the region of £120,000);
• a post pandemic review of town centre footfall which indicated more normal
parking behaviours;
• reports on all the car parks in terms of usage and capacity; and 
9

Page 10

• the current position regarding on street parking charges. 
Councillor Sweeney, seconded by Councillor McLean, moved that the Committee
accept the three petitions and ask Cabinet to note their content when considering the
report on the level of car parking charges at their meeting on 24 January 2023.  As
there was no amendment, the motion was declared carried. 
The Head of Service (Democratic) further clarified to the petitioners that, while
additional petition signatures could continue to be collected, the petition had been
accepted by the Audit and Scrutiny Committee and there would be no further
consideration of the petitions regardless of any increase in signatories. 
In terms of Standing Order 6.8, the Chair agreed that the meeting be adjourned at
11.30 a.m. for a short comfort break. The meeting reconvened at 11.40 a.m. with the
same Members and officers present and in attendance (as previously by remote
electronic means or in person). 
8. 2021-2022 Complaints Report 
Submitted report by the Head of Service (Democratic) on the Council’s complaint
performance and the volumes and trends of complaints received in Financial Year
2021-22.  The report detailed the volume of complaints received and closed,
complaints closed at each stage, complaint outcomes, the average time in working
days for a full response at each stage, complaints closed within timescale, complaint
timescale extensions, trends identified from upheld/partially upheld complaints and
changes or improvements made as a result of complaints.  The Corporate
Complaints Annual Report 2021/22 was attached as an Appendix to the report. 
Members asked questions and were provided with further information in relation to
the following:- 
• timescales on when a service request became a complaint and how these were
dealt with by the relevant Service;
• potential underestimation of complaints which could be attributed to the closure
of Council buildings throughout the pandemic;
• the prospect of a wider report on the operation of complaints input on the Lagan
system;
• the process in terms of a non-resolved stage 2 complaint proceeding to the
Ombudsman; and 
• a manufacturing fault with the purple wheelie bin lids, which had now been
resolved. 
The Head of Service (Democratic) undertook to prepare a report for submission to
the Audit and Scrutiny Committee on the operation of the Lagan system. 
The Committee agreed to note the information contained within the report. 
9. Workforce Absence 2019-2022 
10

Page 11

Submitted report by the Head of Service (People & ICT) providing a year-end
summary of sickness absence for the period 2019/20 to 2021/22.  The report
provided a summary of the sickness absence levels and associated productivity for
the three-year period from 2019-2022 to 2121-2022 and highlighted the policies,
procedures and proactive interventions to support the Council’s workforce. 
The Head of Service (People & ICT) undertook to provide a response to the
Committee in terms Councillor Marshall’s questions on (i) the Office of National
Statistics’ absence rate figure when compared to the Council figure; and (ii) the
difference between the absence rate figure and the loss of productivity figure. 
The Committee agreed to note the absence levels over the last three years and the
support provided to the workforce. 
10. Internal Audit and Corporate Fraud Action Plans: Quarter 2 Update  
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 30 September 2022.  Appendix 1 to the report provided full
details of one Internal Audit action which was not completed within the agreed
timescale. 
Members asked a question and were advised that work was ongoing with IT to
complete the Data Protection Impact Assessment in order to progress with the
upgrade and that this would completed by the end of December 2022. 
The Committee agreed to note (i) the current position with the implementation of the
Internal Audit and Corporate Fraud actions; and (ii) challenges which were faced by
those services which had not implemented actions within the previously agreed
timescales. 
11. Corporate Fraud Team Update Report 
Submitted report by Head of Service (Finance) on the work of the Corporate Fraud
Team between April and September 2022. 
The Senior Manager (Audit, Fraud, Safety and Insurance) highlighted investigations
which had been carried out across a range of areas, including employee related
matters, as well as Council Tax, Discretionary Housing Payments, Scottish Welfare
Fund, Blue Badges and Housing tenancy issues.  The Committee was advised that
joint working with the Department for Work and Pensions (DWP) had paused during
the Covid-19 pandemic but had since recommenced.  This formal joint working
arrangement was in place for cases where suspected frauds relate to both Housing
Benefit and Council Tax Reduction. 
The Senior Manager further advised that the International Fraud Awareness Week
would run from 13-19 November 2022, with events being held across North Ayrshire
to raise knowledge and awareness of the Corporate Fraud Team. 
Members asked questions and were provided with further information in relation to
11

Page 12

the following:- 
• the value assigned to a blue badge by the Cabinet Officer; and
• the 26 tenancies recovered by Housing and the Corporate Fraud Team. 
The Committee agreed to note the work carried out by the Corporate Fraud Team
between April and September 2022. 
12. Internal Audit Reports Issued  
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed between September and October 2022.  The findings from three
audit assignments were detailed at Appendix 1 to the report, together with the
respective executive summaries and action plans. 
The Committee agreed to note the outcomes from the Internal Audit work completed
as set out in the report. 
13. National Fraud Initiative (NFI) in Scotland 2022  
Submitted report by the Head of Service (Finance) providing an overview of the NFI
2020/21 exercise outcomes.  The Council’s financial recoveries from the 2020/21
exercise amounted to £0.091m.  External audit also assessed the Council’s planning
and progress in terms of the NFI with recommendations as appropriate. The National
Fraud Initiative (NFI) Report was detailed at Appendix 1 to the report. 
The Committee agreed to note the outcomes of the exercise. 
14. Urgent Items 
There were no further urgent items for consideration. 
15. Exclusion of the Public – Para 1 
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph 1 of Part 1
of Schedule 7A of the Act. 
16. Investigation Reports Issued 
Submitted report by the Head of Service (Finance) on investigation reports finalised
since the last meeting. 
Noted. 
The meeting ended at 12.30 p.m. 
12

Page 13

NORTH AYRSHIRE COUNCIL 
31 January 2023 
Audit & Scrutiny Committee 
Title:    Elected Member Service Requests 
Purpose:  To inform the Audit and Scrutiny Committee of the Elected
Member constituent service request/query process and
performance for the period 1st April to 30th September 2022. 
Recommendation:  That the Committee notes the report and the information
provided. 
1. Executive Summary 
1.1 This report details how Councillor service requests and queries logged on behalf of
constituents are classified and handled in the Council’s Customer Record
Management system EMPro (formerly called Lagan). 
1.2 The process for logging complaints is distinct from that relating to Councillor service
requests. 
1.3 Performance in terms of response times for the period 1st April to 20th September 2022
is highlighted for the information of Members and is subject to ongoing monitoring by
the Executive Leadership Team. 
2. Background 
2.1 The current system for handling Elected Member service requests was derived following
a workshop involving Councillors, Members Services and Council Officers with a view
to enhancing and streamlining the process some years ago. Several improvements
were identified and implemented as a result of the review, some of which reflected parts
of the Council’s Two Stage complaint handling procedure.  The process which is in place
is detailed below. 
2.2. Councillors are automatically provided with a unique NAC Member online account when
elected, allowing Members to log constituent requests and queries directly into EMPro
quickly, easily and at any time. Councillor service requests and queries raised on behalf
of constituents that require little investigation or are non-complex in nature will be
investigated, actioned (if applicable) and responded to by the relevant Service by no
later than 5 working days.  Such cases are known as Stage One cases and this mirrors
the terminology and timescale of a Stage One corporate complaint.  
Agenda Item 3
13

Page 14

2.3 Councillor requests and queries raised on behalf of constituents that require detailed
investigation, third party involvement or are complex in nature will be investigated,
actioned (if applicable) and responded to by the relevant service by no later than 20
working days.  Such cases are known as Stage Two cases and this also mirrors the
terminology and timescale of a Stage Two corporate complaint. 
2.4 All Councillor cases are logged with a default position of Stage One.  If the Service
investigating the matter determines it is complex or requires detailed investigation
before a response can be provided, the Service will update the case to Stage Two which
will automatically recalculate the due date to 20 workings days from the date the case
was first logged.  Again, this process mirrors the Stage One to Stage Two escalation
process within the Council’s Two Stage corporate complaint handling procedure. 
2.5 When cases are logged, notification of timescales are provided to Councillors and
updates provided in the event the status of a case changes from Stage One to Stage
Two. Services screen Councillor enquiries when they are logged to ensure that they are
escalated for urgent action in the event that this is required. 
2.6 Appendix 1 details the process flow followed when a constituent approaches a
Councillor with a request or a query which requires Council involvement.   
2.7   During the period from 1st April until 30th September 2022, 1,995 service requests were
logged on the EM Pro system, 1,703 of which were raised by Councillors.  The
remaining 292 service requests were enquiries from MPs or MSPs. 
93% of MP/MSP requests were closed on time and 89% of Councillor requests were
closed on time. Requests that did not meet timescales were due to multiple factors,
including: 
• operational pressures
• employee absence/annual leave
• reduced/lack of resources
• further information required to progress requests (including from third parties)
• request complexity including cross-service enquiries 
Whilst there is no national target for timescales to deal with Councillor enquiries, using
the analogy with the complaints process where the national target of 80% is set for
dealing with stage 1 complaints, the performance level for responding to stage 1
Councillor enquiries at 89% represents positive performance. 
2.8 Only one Councillor enquiry was treated at Stage 2 during the period. Several
enquiries would have qualified for consideration at Stage 2 of the process in view of
their complexity, which would in turn have affected the performance statistics by
reducing the number of cases breaching the target response time. 
Where requests breach (or are going to breach) their due dates, Services are advised
to keep Elected Members updated so they can manage their constituents’
expectations. 
2.9     Six monthly management team reviews monitor performance on an ongoing basis. The
reasons for Services breaching response times are detailed in paragraph 2.7.  It should
be noted that some Services were still facing challenges in the post Covid 19 period
14

Page 15

which has affected response times however the internal escalation processes in place
ensure that urgent enquiries requiring immediate service intervention are dealt with
quickly. 
2.10 Complaints follow a separate route under the Scottish Public Service Ombudsman
model complaint handling procedure.  Appendix 2 details the process for logging
complaints when a constituent approaches a Councillor wishing to raise a complaint
about the Council. 
3. Proposals 
3.1 It is proposed that the Committee review and note the report. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Two Stage Councillor Service Request Handling Process supports the Council's
key priority of delivering more effective and efficient service provision. It demonstrates
commitment through focussing on service improvement and delivery for North Ayrshire
residents, customers and visitors 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 None. 
15

Page 16

Aileen Craig
Head of Service (Democratic) 
For further information please contact Darren Miller, Information Governance, on (01294)
322988 or darrenmiller@north-ayrshire.gov.uk 
Background Papers
0
16

Page 17

Appendix 1: Process for when service requests/queries are received from constituents 
17

Page 18

Appendix 2: Process for when complaints are received from constituents 
Councillor raises complaint on behalf of the
constituent using one of the channels listed
above 
(If raised by the Councillor, the Councillor
must specify whether the complaint
response is to be sent to the Councillor, the
complainant or both) 
Follow process flow as per Appendix 1
Councillor asks constituent to raise their
complaint directly with the Council by either:
1. completing the online complaint form
found on the Council’s complaint
webpage here:
Make a complaint (north-ayrshire.gov.uk) 
2. calling the Council’s Contact Centre on
(01294) 310000 
OR
Councillor discusses issue with constituent
Yes
Is the issue being raised a
complaint about the
Council? (definition of a
complaint can be found
here)
No
18

Page 19

NORTH AYRSHIRE COUNCIL
31 January 2023                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit Reports issued
Purpose: To inform the Committee of the findings of Internal Audit work
completed between November and December 2022.
Recommendation: That the Committee considers the outcomes from the Internal
Audit work completed.
1. Executive Summary
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed.
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit.
2. Background
2.1 This report provides information on Internal Audit work completed between November
and December 2022.  Internal control reviews have been completed in respect of the
areas detailed in Appendix 1 to this report. The aim of these reviews is to provide
assurance that the internal control framework within the areas examined is appropriate
and operating effectively.
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit.
2.3 The findings from five separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below:
Agenda Item 4
19

Page 20

Audit Title Assurance Level
Facilities Management Procurement Substantial
Accounts Payable Transaction Testing Q2 Reasonable
Gifts and Hospitality Substantial
Transport – Journeys and Hires Substantial
Scottish Housing Regulator Annual Assurance Statement Substantial 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between November and December 2022. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
20

Page 21

Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.  
21

Page 22

FACILITIES MANAGEMENT PROCUREMENT 
1 Background  
1.1 Facilities Management (FM) procurement was last audited in 2017/18. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• FM are taking steps to minimise food waste in schools
• The environmental impact is considered when making food purchases
• The Council’s Standing Orders relating to Contracts are being applied
when procuring throughout FM (ie for Catering, Janitorial and Cleaning
purchases)
• GPC cards (procurement cards) are being used appropriately 
3 Findings   
Food Waste  
3.1 FM have confirmed they are taking the following steps to minimise food waste
within schools:-
• All primary school pupils must pre-order their lunches.  This means
Catering staff know exactly what meals they need to prepare.
• Secondary school pupils have the option to pre-order their meals.  Whilst
this is not mandatory, it does give some guidance to Catering staff.
• Software is used to analyse and report on popular menu choices and
analyse meal uptakes in secondary schools.  This supports Catering staff
in planning production quantities.
• Annual menu consultations are undertaken to ensure meal choices are
popular, which helps minimise food waste.  
3.2 The above confirms that FM are working to minimise food waste.     
Environmental Impact  
3.3 North Ayrshire Council has been awarded a Gold Food for Life Award from the
Soil Association for 106 of its sites.  All the Council's schools, except one
Academy which is a commercial kitchen, early learning centres and private early
learning centres supplied by FM catering feature on the Gold Award list.  
3.4 In order to obtain the gold award FM had to show its menus are healthy, ethical,
use lots of local ingredients, supports good animal welfare practices and
sustainable farming methods.  
3.5 The Soil Association annually audits the Council’s application prior to issuing an
award.  
3.6 Audit has placed reliance on the Soil Association’s assessment, and subsequent
award. 
Standing Orders
22

Page 23

3.7 Due to the high volume of catering purchases, FM have approval to use GPC
cards to pay for catering supplies, so long as the Council has a contract with the
supplier.   
3.8 Catering and janitorial purchases are invoiced and processed via Integra.  
3.9 Irrespective of the method of payment, the Council’s Standing Orders must be
applied to all purchases.  
3.10 Audit selected a sample of 19 suppliers paid via invoice, and 12 suppliers paid via
GPC card - with varying levels of actual spend - and reviewed the contract in
place to ensure if complied with Standing Orders.    
3.11 No issues were noted – appropriate contracts were identified for all 31 suppliers
tested, and only catering suppliers had been paid via GPC card. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard FM procurement. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
23

Page 24

ACCOUNTS PAYABLE TRANSACTION TESTING Q2 
1 Background  
1.1 This audit used computer audit software called IDEA (Interactive Data Extraction
and Analysis) to interrogate the Accounts Payable (AP) System and examined
any anomalies which arose.  
1.2 There were 4,161 active Trade Suppliers (for processing payments to standard
suppliers, individuals, and social services) and 479 Sundry Suppliers (for
processing one-off sundry payments) on Integra as at 01/07/22.    
1.3 There were 49,891 invoices paid to trade and sundry suppliers during the period
of the audit totalling just over £151 million.  
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• duplicate suppliers are identified and de-activated to minimise the risk of
duplicate invoices being paid.
• duplicate invoices have not gone undetected.
• advance payments have been reported to Financial Management for the
list of pre-payments at financial year-end.
• high value invoices have been properly authorised.
• invoices paid to employees are bona fide.  
2.2 The audit period was 1st January 2022 to 30th June 2022.  This audit will be
carried out again in quarter 4.    
3 Findings   
Supplier Tests  
3.1 Testing was carried out to identify duplicate trade suppliers on the system. 
Testing identified 28 duplicate suppliers either by supplier name or bank details. 
These were passed to the AP team to review and deactivate as appropriate. 
(Action a)  
3.2 Testing also highlighted 14 active suppliers with no bank details recorded on
Integra.  These were passed to the AP team for information purposes.   
Invoice Tests  
3.3 The auditor tested for duplicate invoices for payments to suppliers and identified
193 possible duplicates that were investigated further.  This confirmed that 65
were duplicates but had already been identified and action taken by the AP team. 
This testing therefore identified 8 potential duplicate invoices totalling £15,781.40,
which have not already been identified by the AP team.  The potential duplicates
have been passed to the AP team to check and arrange recovery.  (Action b)  
3.4 There were 104 invoices with a payment date before the invoice date.  Testing
was carried out on a sample of 10 and in 5 cases the invoice date was keyed
24

Page 25

incorrectly and in 5 cases the invoice date was keyed correctly and has been paid
in advance. However, it should be noted that most of them were paid a week or
less in advance.  
3.5 There were 320 invoices with a payment date more than 1 year after the invoice
date. Testing was carried out on a sample of 10 and in 6 cases the correct invoice
date was keyed and there was a significant delay in the receipt of invoice.  In one
case an invoice was dated 07/12/16 and was received 03/03/22.  The other 4 had
the dates wrongly keyed. Financial Management confirmed that there are no VAT
implications when paying invoices more than 1 year old.  However, it should be
noted that invoice date keying errors will impact the monitoring of paying invoices
on time.    
3.6 The Team Leader (Procurement) advised a reminder will be issued to users that
process invoices about the importance of accuracy when entering invoice dates.   
Advance Payment Tests  
3.7 The auditor tested for round sum amounts over £20,000 to help identify any
advance payments.  There were 40 invoices found meeting this criterion plus an
additional 10 payments over £20,000 were randomly selected that were not round
sum amounts.  This resulted in 22 being passed to Financial Management to
confirm the correct action had been taken ahead of the annual accounts being
closed.  The Financial Management review confirmed the correct action had been
taken and no adjustments were required.   
High Value Payment Tests  
3.8 There were 1,639 invoices between £10,000 and £100,000 and 15 were selected
for audit testing and the auditor noted the following:
• Testing found that 1 HSCP invoice for £64,783.80 had been approved by 4
different Care at Home Managers but 3 are not authorised signatories and one
approved above their approval limit.  The Business Support Officer will
arrange for the Care at Home Managers to be added to the authorised
signatory list.
• Testing found one Building Services invoice for £93,308.31 had been
approved by an authorised signatory but it was above their approval limit.  The
Senior Officer agreed to only authorise invoices within their approval limit. 
• There were 3 invoices with no payments over £10k report attached.  
3.9 There were 236 invoices over £100,000 totalling £72,444,332.32 and 15 were
selected for audit testing and the auditor noted the following:
• 1 invoice had no payments over £10k report attached.   
Creditors to Payroll Data Match  
3.10 The auditor tested for employees who have been paid via Integra.  There were 31
supplier bank details matching an employee’s bank details.  All invoices paid to
these suppliers were checked and there were no concerns to note.  
4 Internal Audit Opinion  
25

Page 26

4.1 Overall, reasonable assurance was obtained with regard to the controls around
the processing of invoices, in particular to preventing duplicate invoices being
processed as the number of potential duplicates identified is relatively low. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
26

Page 27

KEY FINDINGS AND ACTION PLAN
ACCOUNTS PAYABLE TRANSACTION TESTING Q2 
Action a
Finding Testing was carried out to identify duplicate trade suppliers on
the system.  Testing identified 28 duplicate suppliers either by
supplier name or bank details.  These were passed to the AP
team to review and deactivate as appropriate.  
Action Description Procurement should review the list of duplicate suppliers and
de-activate suppliers as appropriate.
Risk Duplicate invoices may be paid to the same supplier via
different supplier numbers.
Priority (1, 2, 3) 1
Paragraph Reference  3.1
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Quinn, Senior Manager (Corporate Procurement)
Due Date 30th November 2022
Management Comment The Accounts Payable Team will investigate the 28 potential
duplicate suppliers by 30/11/2022 and report findings and
action taken to remove to Internal Audit. 
Action b
Finding Testing identified 8 potential duplicate invoices totalling
£15,781.40, which have not already been identified by the AP
team.  
Action Description AP should review the potential duplicate invoices and arrange
for recovery of monies paid twice.
Risk The Council has paid the same invoice twice and the money
has not been recovered. 
Priority (1, 2, 3) 1
Paragraph Reference  3.3
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Quinn, Senior Manager (Corporate Procurement)
Due Date 30th November 2022
Management Comment The Accounts Payable Team will investigate the 8 potential
duplicate invoices totalling £15,781.40 by 30/11/2022 and
recover where appropriate or to notify Internal Audit why the
duplicate payment is legitimate. Recovery of funds can take
several months. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
27

Page 28

GIFTS AND HOSPITALITY 
1 Background  
1.1 Directorates are responsible for recording gifts and hospitality in compliance with
the Council’s guidance in the Employee Code of Conduct. 
1.2 The HR Operations team are accountable for the Employee Code of Conduct
document. 
1.3 Previous audit work completed in 2017 identified 6 actions in relation to
communicating and recording gifts and hospitality. 
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• All employees are made aware of the Employee Code of Conduct and
have access to an up-to-date copy
• Gifts and hospitality are being recorded by services as required in the
Employee Code of Conduct and that gifts and hospitality are only being
accepted as permitted by the code. 
3 Findings  
3.1 The Code of Conduct document is available to all employees with IT network
access. Copies for employees who do not have IT access should be provided by
the service. 
3.2 New starts receive the Code of Conduct via their offer of employment. 
3.3 The HR Operations team put reminders regarding the requirements of the Code
of Conduct in relation to Gifts and Hospitality in the “People Matters” newsletter,
which is distributed to all employees, in November 2019, December 2020 and
December 2022.  
3.4 Six current Gifts and Hospitality registers were provided by services. These follow
a standard format recorded on a mixture of Microsoft Word and Excel documents. 
3.5  A sample of records recorded in the registers indicated that there were no items
of substantial value recorded. Where required they have been appropriately
authorised. Some services have recorded all donations which ensures
transparency. Cash donations were returned to the donors with a covering letter. 
3.6 Education has issued guidance to parents and carers advising them to consider
not giving gifts to school staff. 
3.7  No potential conflict of interest or potential collusion with suppliers was identified
from the registers provided. 
3.8  No whistle blowing incidents were identified.  
28

Page 29

4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to compliance with the
Employee Code of Conduct in respect of Gifts and Hospitality. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
29

Page 30

TRANSPORT – JOURNEYS AND HIRES 
1 Background  
1.1 The Council’s Corporate Transport Hub manage and coordinate mainstream and
additional support needs (ASN) school transport. School transport is delivered in
partnership with Strathclyde Partnership for Transport (SPT), taxi contractors
and/or
parents/carers to ensure the most efficient, suitable and economical use of
resources
to support children and young people to access their educational entitlement.  
1.2 The Transport Hub also manage and coordinate transport for the Health and
Social Care Partnership (HSCP) which are requested for service users who are
eligible according to the HSCP Policy and Procedures document.  
1.3 A new IT system, Flexi Route, for managing journeys and hires, was implemented
in 2021. This system interfaces with Integra but the invoices paid via this interface
are stored in the Corporate Transport Hub’s shared drives.   
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• suitable policies and procedures are in place in relation to the provision of
transport to pupils and service users
• processes for appointment of contractors comply with the Council’s Standing
Orders for Contracts, are equitable and obtain value for money
• controls are in place to restrict access to personal and sensitive data and
adhere to the GDPR
• processes are in place to pay contractors promptly and accurately.  
2.2 The audit focussed on journeys provided by taxi contractors rather than those
provided by SPT.   
3 Findings   
Policies and Procedures  
3.1 Transport policy documents were provided by Education and HSCP and no
issues were noted.  
3.2 The Corporate Transport Hub are in the process of producing a suite of
procedure documents for staff, including screenshots from the Flexi Route
system.  The procedures were reviewed by the auditor. Feedback was provided
with some suggested minor improvements.     
Appointment of Contractors  
3.3 The Corporate Transport Hub provided a list of ledger codes they use to charge
invoices for transport contractors.  Details of invoices charged to these codes
30

Page 31

over a 12-month period were extracted from Integra and analysed to identify the
contractors.  This identified 58 suppliers, 9 of which were in receipt of over
£100,000.  
3.4 A sample of contractors from the analysis at 3.3 was selected for further testing. 
Contract and tender documentation was held either on the Corporate Transport
Hub’s shared drives or the Corporate Procurement Unit’s shared drive, depending
on the type of document.  All the sample contractors had been appointed as part
of a large procurement exercise run in co-operation between these two teams,
known as a Dynamic Purchasing System (DPS).  All the documentation required
for audit was available and no issues were identified.  
3.5 There isn’t a routine contract monitoring regime per se, but all vehicles are
subject to regular inspection by the Council’s Transport Garage. The Corporate
Transport Hub investigate any issues raised during these inspections or by
parents, carers and Council employees within their own team or others.  They
may request a face-to-face meeting with the contractor and have an escalation
process if contract terms and conditions have been breached, including warning
letters and eventual termination of contract.  They involve the Council’s Legal
team before issuing any written warnings.  
3.6 The Corporate Transport Hub hold a record of variations to contract in their
shared drive.  224 variations during a 12-month period were identified from review
of these records and a sample were selected for further testing.  If the variation
results in a change of less than 5 miles in a route, then the price paid to the
contractor doesn’t change.  No issues were identified from the review of the
sample variations.   
Data and IT Security  
3.7 Service User data is held in the Corporate Transport Hub shared drive, for which
access is restricted to the Transport Hub team, and the Flexi Route system,
which also has access restricted to the Transport Hub team and a small number
of users in client teams.  
3.8 At the time of audit testing, there were 29 users set up in Flexi Route and 16 of
them had admin access, which is a high proportion of the small number of users. 
This is because certain functions can only be completed with the admin access. 
The Team Manager confirmed that the user list is kept under review and certain
users would only have access for a limited time, such as Internal Audit and
Transformation team members.  
3.9 Sensitive data is transmitted to contractors to allow them to provide the required
service.  It is emailed to them in a protectively marked email or occasionally, if
they require hard copies, they must come into the Transport Hub to receive the
information in person.  All contractors are required to sign a Data Processing and
Sharing Agreement.  
3.10 All of the contractors in the sample at 3.4 had signed the Data Processing and
Sharing Agreement with the Council as part of the contract documentation.    
31

Page 32

Payment of Contractors  
3.11 A sample of payments to contractors was tested to ensure that the journeys and
pricing were in line with the contracts and correctly authorised and the invoices
were arithmetically correct, ledger postings were correct and VAT invoices
contained the required details.  No issues were noted.   
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the administration of
pupil and service user transport by the Corporate Transport Hub.   
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
32

Page 33

SCOTTISH HOUSING REGULATOR ANNUAL ASSURANCE STATEMENT 
1 Background  
1.1 The Scottish Housing Regulator (SHR) is responsible for monitoring, assessing,
and reporting on social landlords’ performance.  A regulatory framework is in
place to support the SHR with this task.  
1.2 This framework requires the Council to submit an Annual Assurance Statement
(AAS) stating whether all requirements of the regulations have been met.    
1.3 The Council’s Audit & Scrutiny Committee is responsible for approving the AAS
prior to its submission. 
2 Objectives and Scope  
2.1 The objective of this audit is to ensure there is sufficient evidence to support the
statements made in the Council’s 2021/22 AAS. 
3 Findings  
3.1 The Scottish Federation of Housing Associations (SFHA) has a self-assessment
toolkit to help social landlords assess their compliance with regulatory
requirements. 
3.2 Recording detailed responses to the questions in the toolkit helps provide
evidence of compliance by creating an audit trail of the Council’s decision making
process.  
3.3 Whilst this toolkit has been used by the Council in prior years, it wasn’t updated in
2021/22.  (action point a) 
3.4 There are 5 requirements covered within the SHR regulations for ‘Assurance and
Notification’.  Audit has asked Housing to provide evidence of compliance for
each of these.   
Requirement 1 of ‘Assurance and Notification’ regulation:- 
Prepare an Annual Assurance Statement in accordance with our published
guidance, submit it to us between April and the end of October each year, and
make it available to tenants and other service users.  
3.5 The Annual Assurance Statement for the financial year ending 31 March 2022
was presented to, and approved by, the Audit & Scrutiny Committee on 27th
September 2022 and submitted to the SHR later the same day. 
3.6 A copy of the 2021/22 Assurance Statement, along with a supporting evidence
document has been made available to tenants via the Council’s website.  
3.7 There is sufficient evidence to confirm compliance with Requirement 1.   
Requirement 2 of ‘Assurance and Notification’ regulation:-
33

Page 34

Notify us during the year of any material changes to the assurance in its
Assurance Statement.  
3.8 Housing confirmed that no material changes occurred during the year, therefore
no notifications were made to the SHR.  
3.9 Housing explained that any significant issues arising with the completion of
compliance testing ie gas safety testing, ensuring properties are EICR (Electrical
Installation Condition Reports) compliant and the installation of smoke detection
equipment would be highlighted immediately by PMI (who are responsible for
managing the testing programme)  
3.10 In addition, the progress of all capital programmes managed by PMI, including
compliance testing, are discussed at the Housing Asset Management Board
(HAMB) meetings, which are held every 2 months.    
3.11 Audit obtained copies of the most recent minutes from the HAMB and confirmed
there was evidence of compliance testing/housing programmes being discussed.  
3.12 Housing have demonstrated that any significant issues with compliance would be
highlighted by ongoing monitoring processes.  This would allow a timely
disclosure to the SHR.  Audit has accepted this as sufficient evidence of
compliance with Requirement 2.   
Requirement 3 of ‘Assurance and Notification’ regulation:-
Have assurance and evidence that it is meeting all of its legal obligations
associated with housing and homelessness services, equality and human rights,
and tenant and resident safety.  
3.13 Housing directed Audit to the Council’s 2020/21 Assurance Toolkit as evidence of
compliance.  
3.14 Housing has confirmed that a review of the 2020/21 toolkit was undertaken prior
to relying on it as evidence for 2021/22.  
3.15 Audit selected a sample of the evidence sources listed in the 2020/21 toolkit and
asked Housing to prove that these remain relevant in 2021/22.  
3.16 Policies and procedures help Housing ensure that legal requirements are being
met by providing Officers with a detailed framework within which to operate. 
Audit selected a sample of 3 of the policies/strategies noted in the toolkit and
confirmed these remain available to Council Officers during 2021/22.    
3.17 Performance monitoring helps Housing remain focussed on meeting its targets. 
Audit requested copies of the most recent minutes for 3 of the performance
monitoring groups noted in the toolkit – as evidence that these groups are still
meeting regularly.    
3.18 Whilst 2 of the 3 groups listed no longer meet, Housing were able to provide
minutes from 2 alternative groups that cover performance monitoring (action
point a).    
34

Page 35

3.19 In addition to the above, Audit asked for:-
• A copy of the annual report to the Scottish Government re the RRTP (rapid
re-housing transition plan) – as this confirms the monitoring of the
Council’s ongoing works and improvements in the area of homelessness
• A copy of the most recent Scottish Statistical Bulletin – as this would list
any incidences of the Council providing unsuitable temporary
accommodation.
• A copy of the most recent care inspectorate review covering the Council’s
support provider status for homeless applicants - as this shows the Council
has a robust process in place for such applications 
3.20 All of the above documents were provided by Housing.  
3.21 The Council declared it didn’t achieve all its compliance testing within the 2021/22
AAS – 360 gas safety checks were not completed during the year, 6090
properties were not EICR (Electrical Installation Condition Reports) compliant,
and 735 properties did not have the new smoke detection equipment installed. 
3.22 Audit obtained copies of the reports from PMI which confirmed the accuracy of
the above statistics.  
3.23 Audit has accepted the above as sufficient evidence of compliance with
Requirement 3.   
Requirement 4 of ‘Assurance and Notification’ regulation:-
Notify us of any tenant and resident safety matters which have been reported to
or are being investigated by the Health and Safety Executive, or reports from
regulatory or statutory authorities, or insurance providers, relating to safety
concerns.  
3.24 Housing has confirmed that no issues were reported to the Health and Safety
Executive in 2021/22.  
3.25 Regular meetings are held with the Council’s Health & Safety team which would
highlight any reported safety matters to the Housing team.  
3.26 Audit has accepted the explanation from Housing as sufficient evidence that
Requirement 4 has been met.   
Requirement 5 of ‘Assurance and Notification’ regulation:- 
Make its Engagement Plan easily available and accessible to its tenants and
service users, including online.  
3.27 Housing directed Audit to the ‘Tenant Participation’ section on the Council
website.    
3.28 This section provides a link to the SHR website through which users can access
the Council’s Engagement Plan.  
3.29 It also provides a link to the Council’s ‘Customer Connections Strategy’ and
makes it clear that this document takes into account the requirements of the
Scottish Social Housing Charter.
35

Page 36

3.30 Information for tenants such as the tenant handbook, annual performance
information, quarterly newsletters, and advice on how tenants can participate in
future decision making is also available.  
3.31 Audit has accepted the information available via the Council’s website as
sufficient to meet Requirement 5. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard the evidence to support
the Council’s 2021/22 AAS.  
4.2 The re-introduction of the Assurance Toolkit would provide a more concise audit
trail of the assurance decision reported in the AAS. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
36

Page 37

KEY FINDINGS AND ACTION PLAN
SCOTTISH HOUSING REGULATOR ANNUAL ASSURANCE STATEMENT 
Action a 
Finding The SFHA Assurance Toolkit wasn’t updated when
completing the 2021/22 Annual Assurance Statement.
Action Description The Assurance Toolkit should be updated each when
completing the Annual Assurance Statement.   
The toolkit should provide audit evidence of the current
processes and procedures within the Council.
Risk Prior year toolkits may not reflect current processes.
Priority (1, 2, 3) 3
Paragraph Reference  3.3; 3.18
Managed by Yvonne Baulk, Head of Service (Housing and Public
Protection)
Assigned to Fiona Ellis, Senior Manager (Housing Strategy &
Development)
Due Date 30th June 2023
Management Comment The aim for 2023 is to have the Annual Assurance Statement
presented to Audit & Scrutiny prior to the summer recess and
immediately after the ARC submission to the Scottish
Housing Regulator.  Therefore, the toolkit will be reviewed
and updated prior to the end of June 2023. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
37

Page 38

38