Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
will be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Tuesday, 27 September 2022 at 10:00 to consider the undernoted
business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of (i) the Ordinary Meeting of the Audit and
Scrutiny Committee held on 31 May 2022; and (ii) the Special Meeting
held on 30 June 2022 will be confirmed and the Minutes signed in
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government
(Scotland) Act 1973 (copy enclosed). 
3 External Quality Assessment of Internal Audit by West
Dunbartonshire Council 
Submit report by the Head of Service (Finance) on the findings of the
recent external review of Internal Audit carried out by West
Dunbartonshire Council  (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Accounts Commission’s Report: Local Government in Scotland:
Overview 2022
Submit a report by the Head of Service (Finance) on the findings of the
Local Government in Scotland Overview 2022 report by the Accounts
Commission (copy enclosed). 
5 Internal Audit Annual Update Report: North Ayrshire Integration Joint
Board (IJB)
Submit report by the Head of Service (Finance) on the IJBs Annual
Report for 2021/22 and the approved internal audit plan for 2022/23
(copy enclosed). 
6 Strategic Risk Register 2022/23
Submit report by the Head of Service (Finance) on the Council’s agreed
Strategic Risk Register for 2022/23 (copy enclosed). 
7 Internal Audit and Corporate Fraud Action Plans: Quarter 1 Update
Submit report by the Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 June 2022 (copy enclosed). 
8 Internal Audit Plan 2022/23: Mid-Year Update
Submit report by Head of Service (Finance) on progress made in
delivering the 2022/23 Internal Audit Plan (copy enclosed). 
9 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between May and August 2022 (copy enclosed). 
10  Counter Fraud and Corruption Strategy
Submit report by the Head of Service (Finance) on the refresh of the
Council’s Counter Fraud and Corruption Strategy (copy enclosed). 
11  Annual Assurance Statement to the Scottish Housing Regulator
2021/22
Submit report by the Executive Director (Place) on the Council’s Annual
Return on the Charter 2021/22 submission and on endorsement of the
Annual Assurance Statement for submission to the Scottish Housing
Regulator (copy enclosed). 
12  Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
13  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
14  Investigation Reports Issued
Submit report by the Head of Service (Finance) on investigation reports
finalised since the last meeting (copy enclosed). 
15  Internal Audit and Corporate Fraud Action Plans: Quarter 1 Update
(exempted items)
Submit report by the Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 June 2022 (copy enclosed).  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Ian Murdoch
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

Audit and Scrutiny Committee
31 May 2022 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Cameron Inglis, Tom Marshall and Matthew
McLean. 
In Attendance (Physical Participation)
A. Sutton, Executive Director and A. McClelland, Head of Service (Education)
(Communities and Education); M. Boyd, Head of Service, D. Forbes, Senior
Manager (Strategic Business Partner), L. Miller, Senior Manager (Audit, Fraud
Safety and Insurance) (Finance), A. Craig, Head of Service (Democratic), H. Clancy
and D. McCaw, Committee Services Officers (Chief Executive’s Service). 
In Attendance (Remote Electronic Participation)
C. Cameron, Director (Health and Social Care Partnership); R. Arthur, Head of
Service (Connected Communities) (Communities and Education); M. Anderson,
Senior Manager, Committee and Member Services and A. Little, Committee Services
Officer (Chief Executive’s Service). 
Also in Attendance (Physical Participation)
Beth Griffin and Lynn Kirkland (NHS Ayrshire and Arran). 
Also in Attendance (Remote Electronic Participation)
P. Kenny (Deloitte). 
Chair
Councillor Bell in the Chair. 
Apologies
Davina McTiernan, Ian Murdoch and John Sweeney. 
1. Chair’s Remarks 
The Chair agreed, in terms of Standing Order 10.5, to vary the order of business to
allow consideration of Agenda Item 3: External Audit Report on Audit Dimensions
and Best Value for the year ended 31 March 2022, immediately following Agenda
Item 10: Participatory Budgeting, to allow remote attendance by the External Auditor. 
2. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
Agenda Item 2
5

Page 6

3. Accounts Commission’s Report: Local Government in Scotland: Financial
Overview 2020/21 
Submitted report by the Head of Service (Finance) on the findings of the recently
published Accounts Commission report on the Financial Overview 2020/21 of Local
Government in Scotland. The report analysed the annual accounts produced by
Local Authorities together with the reports of each body’s external auditors, to
identify relative performance, highlight challenges faced and assess responses to
those challenges. The relevant feedback on each of the key messages, across 3
main categories identified, was detailed in Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• Covid-19 related funding which could not be spent in the last financial year and
which was, therefore, identified as earmarked reserves in the current financial
year for the specified set-aside purpose; and 
• section 2.3 of the report being relative to the national position across Scotland
with Section 2.5 specific to North Ayrshire. 
The Committee agreed to note (i) the findings of the recent Accounts Commission
report; and (ii) the current position regarding North Ayrshire in relation to the findings. 
4. Internal Audit Annual Report 2021/22 
Submitted report by the Head of Service (Finance) on the work of Internal Audit
during 2021/22, covering the 14-month period from 1 February 2021 – 31 March
2022, and detailing an opinion on the governance, risk management and internal
control environment of the Council.  The full report was attached at Appendix 1 to the
report. 
Members asked questions and were provided with further information in relation to: 
• the potential to reduce the number of procurement cards in operation
throughout North Ayrshire in order to mitigate misuse;
• the rationale for the allocation of Procurement Cards to more than one person
within a service;
• the retrospective procurement card transaction authorisation process by a
designated approver;
• delays between the purchase of goods/services and approval of transactions;
and
• spending level analysis information which could be provided to the Committee. 
The Head of Finance undertook to confirm the current number of Procurement Cards
in operation across North Ayrshire, together with options for rationalising the number
being utilised, and to provide spending level analysis information to the Committee. 
The Committee agreed to note (i) the content of the annual report detailed at
Appendix 1 to the report and (ii) the opinion of the Senior Manager on the Council’s
governance, risk management and internal control environment. 
6

Page 7

5. Annual Governance Statement 2021-22 
Submitted report by the Head of Service (Finance) on the Council’s Annual
Governance Statement for 2021-22 for inclusion within the draft Annual Accounts. 
The Annual Governance Statement, detailed at Appendix 1 to the report, outlined the
governance framework in place and changes which had been made to strengthen
the framework during 2021-22. 
The Committee agreed to approve the draft Annual Governance Statement as
detailed at Appendix 1 to the report. 
6. Accounting Policies 2021/22 
Submitted report by the Head of Service (Finance) on the accounting policies which
would be adopted in the preparation of the Council’s Annual Accounts for the year to
31 March 2022.  The draft Accounting Policies proposed for adoption were detailed
at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• the number of leases currently held by North Ayrshire Council;
• the benefit of utilising loans to buy assets outright as opposed to leasing in the
current financial climate; and
• termination benefit information being provided to the Committee on a service
basis. 
The Senior Manager (Strategic Business Partner) undertook to provide termination
benefit information to the Committee on a service basis. 
The Committee agreed to approve the Accounting Policies as detailed in Appendix 1
to the report. 
7. Corporate Fraud Team Annual Report 2021/22 
Submitted report by the Head of Service (Finance) on the work of the Corporate
Fraud Team during 2021/22, where 280 referrals for investigation had been
received. 
The Senior Manager (Internal Audit, Risk and Fraud) highlighted investigations which
had been carried out across a range of areas including employee-related matters as
well as Council Tax, Discretionary Housing Payments, Scottish Welfare Fund, Blue
Badges and Housing tenancy issues.  The Committee was advised that joint working
with the DWP Single Fraud Investigation Service (SFIS) in cases where there were
suspected frauds relating to both DWP Benefits and Council Tax Reduction, had
been suspended during the Pandemic, but the DWP had intimated that this work
would recommence.  It was further highlighted that the increase in referrals was not
yet back to pre Covid-19 levels. 
Members asked questions and were provided with further information in relation to: 
• whether ‘scammers’ were still an issue across North Ayrshire; and
7

Page 8

• the slight reduction in the number of blue badge misuse warning letters issued
given that the Corporate Fraud Team investigated 100% of the referrals made
to the Team. 
Noted. 
8. Internal Audit and Corporate Fraud Action Plans: Quarter 4 Update 
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 31 March 2022.  Appendix 1 to the report provided full details of
the actions which were not completed within the agreed timescale, including the
most recent update information. 
Members asked questions and were provided with further information in relation to: 
• progress with the first 2 HSCP actions on page 96 of the report Appendix, with
delays being attributed jointly to the 3 Ayrshire Councils and the NHS Board;
and
• the establishment of a short-life working group to progress both HSCP actions
with estimated completion by December 2022 
The Committee agreed to note (i) the current position with the implementation of
Internal Audit and Corporate Fraud actions; and (ii) that those Services which had
not implemented actions within the previously agreed timescales would be
challenged. 
9. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed between March and April 2022.  The findings from four audit
assignments were detailed at Appendix 1 to the report, together with the respective
executive summaries and action plans. 
Members asked questions and were provided with further information in relation to: 
Secondary Schools
• self-assessments carried out by secondary schools due to the Covid-19
pandemic;
• the audit planning process focussing primarily on Primary Schools in the
current year; and
• the use of any surplus time gained once planned audit work had been
completed, to allow a focus on Secondary Schools. 
Noted. 
10. Participatory Budgeting 
Submitted report by the Executive Director (Communities and Education) providing
an update on engagement methods used in Participatory Budgeting events and on
future engagement approaches following the easing of restrictions in terms of
Covid-19.
8

Page 9

The Committee agreed to approve the recommended engagement methods for use
in future Participatory Budgeting events, as set out in the report. 
11. External Audit Report on Audit Dimensions and Best Value for the year
ended 31 March 2022 
Submitted report by Head of Service (Finance), and received a verbal report by the
External Auditor, on the findings from the External Audit report on Audit Dimensions
and Best Value for 2021/22 which summarised the external auditor’s conclusions
across four audit dimensions within the scope of the 2021/22 audit work, and the
review of arrangements made by the Council for securing Best Value. The full
External Audit Report was attached at Appendix 1 to the report. 
The Committee agreed (a) to note (i) the findings contained in the External Auditor’s
very positive Audit Dimensions and Best Value report detailed at Appendix 1 to the
report; and (ii) the sector developments as outlined in the report; and (b) to receive
the External Auditor’s Annual Report on the accounts to the meeting to be held on 27
September 2022. 
12. Exclusion of the Public – Para 1 
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph 1 of Part 1
of Schedule 7A of the Act. 
13. Investigation Reports Issued 
Submitted report by the Head of Service (Finance) on investigation reports finalised
since the last meeting. 
Noted. 
The meeting ended at 11.05 a.m. 
9

Page 10

Audit and Scrutiny Committee
30 June 2022 
At a Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
at 10.00 a.m. involving participation by remote electronic means, 
Present
John Bell, Eleanor Collier, Cameron Inglis, Tom Marshall, Matthew McLean, Ian
Murdoch and John Sweeney. 
Also Present
Joe Cullinane, Scott Davidson, Todd Ferguson, Robert Foster, Tony Gurney, Alan
Hill, Christina Larsen and Nairn McDonald. 
In Attendance
A. Sutton, Executive Director (Communities and Education); C. McAuley, Head of
Service (Economic Development and Regeneration) and L. Kirk, Senior Manager
(Regeneration) (Place); M. Boyd, Head of Service (Finance), A. Craig, Head of
Service (Democratic), C. Stewart and H. Clancy, Committee Services Officers (Chief
Executive’s Service). 
Chair
Councillor Bell in the Chair. 
Apologies
Davina McTiernan and Donald Reid. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Call-In: Revenue Budget 2021/22: Financial Performance to 31 March 2022 
Submitted report by the Chief Executive on a call-in request received in respect of
a decision taken by Cabinet on 7 June 2022 on the financial performance of the
Council at 31 March 2022. The report to Cabinet, with various appendices,
attached at Appendix 1 to the report, contained detailed explanations of the
significant variances in service expenditure compared to the approved budgets,
together with information on funding to be carried forward to support expenditure
during 2022/23, a full list of the proposed carry forward of earmarked funds and
information in respect of the Housing Revenue Account (HRA). An updated briefing
note had been provided by the Head of Service (Finance) and was attached at
Appendix 2 to the report. 
The Cabinet agreed (a) to note (i) the information and financial performance outlined
in the report and its associated appendices, (ii) the transfer of the net in-year
underspend of £3.073m to supplement the Investment Fund, (iii) the financial
performance of the Health and Social Care Partnership at paragraph 2.7 of the
report and (iv) the IJB cumulative deficit position of £2.320m at 31 March 2022; and
10

Page 11

(b) to approve the additional earmarking of £11.833m identified at section 2.5 of the
report to meet future year commitments.
Subsequently, a call-in request was received from Councillors Foster, McDonald
and Cullinane in the following terms:- 
Reason for Call-In 
“To provide more support to residents struggling with the cost-of-living crisis.” 
Desired Outcome 
“• Remove Contribution to the Loans Fund 
• Remove Provision for additional non-contractual inflationary pressures (with it to be met
by existing unearmarked reserves 
Reallocate to: 
• £500,000 pre-payment meter fund to support low-income families on pre-payment
meters 
• £750,000 to reinstate £4 per eligible child per day voucher scheme during the school
holidays for the remainder of 2022/23. 
• Additional £1,000,000 the Community Based Energy Support (check name) for energy-
efficiency grants 
• £300,000 to provide a £50 winter top-up to the school clothing grant in 2022/23 
• Additional £200,000 for Cost of the School Day activity win 2022/23 to address the rising
cost of living 
• £641,000 to widen access to the Better Off financial inclusion service.” 
Prior to consideration of this matter, the Head of Democratic Services summarised
the procedure for considering the call-in requests in terms of Standing Orders and
referred to the Cabinet decision. 
Thereafter, the Members who had requested the call-in were invited to speak.
Councillor McDonald advised that he would speak to this call - in request along
with the two others on the agenda, with Councillors Cullinane and Foster being
available to answer any questions, if required. He then addressed the Committee in
support of the call-in request. 
The Chair then invited Councillor Larsen, as the Cabinet Member for Finance, to
address the meeting. She explained the reasoning for the Cabinet decision and
referred to an updated briefing note from the Head of Service (Finance) provided at
Appendix 2 to the report. 
The Head of Service (Finance) was also heard in relation to the report presented to
Cabinet and on issues raised by the call-in, reference being made to the briefing
note at Appendix 2. 
Members asked questions of Councillors McDonald, Larsen and the Head of Service
(Finance) and were provided with further information in relation to: 
• Anticipated inflationary increases, since the Council had set its budget for the
current financial year;
• Inflation and the cost of living; and
11

Page 12

• The position on Reserves, in view of the anticipated inflationary increase, and
potential pressure on budgets.
Councillor Marshall, seconded by Councillor Inglis, moved that the Committee agree
not to support the call-in request and that the previous decision of Cabinet should
stand. 
As an amendment, Councillor Sweeney, seconded by Councillor Bell, moved to
accept the terms of the call-in request. 
Thereafter, on a division and a roll call vote, there voted for the amendment,
Councillors Bell and Sweeney (2) and for the motion, Councillors Collier, Inglis,
Marshall, McLean and Murdoch (5), and the motion was declared carried. 
Accordingly, the Committee agreed not to support the call-in request. 
3. Call In: Regeneration Delivery Plan Funding Proposals 2022/23 
Submitted report by the Chief Executive on a call-in request received in respect of a
decision taken by Cabinet on 7 June 2022 on the Regeneration Delivery Plan
Funding Proposals for 2022/23. The report to Cabinet, attached as an Appendix to
the report, sought approval for the 2022/23 Regeneration Delivery Plan funding
proposals. An updated briefing note had been provided by the Executive Director
(Place) and was attached at Appendix 2 to the report. 
The Cabinet agreed (a) to approve the Regeneration Delivery Plan funding
proposals for 2022/23 provided at Appendix 1 to the report; (b) that delegated
authority be granted to the Executive Director (Place) to agree changes to the
funding allocations in consultation with the Portfolio Lead, as required; and (c) to
note the update on the previously agreed Levelling Up Fund (LUF) bid for the
‘Gateway to the West Coast and Clyde Islands strategic regeneration package’ and
that this LUF bid would now be solely based on the development of Lochshore. 
Subsequently, a Call In request was received from Councillors Foster, McDonald
and Cullinane in the following terms:- 
Reason for Call In 
“To tackle privately owned vacant and derelict sites in North Ayrshire with a fund to
bring the sites into council or community ownership.” 
Desired Outcome 
“Remove the following from the Placed based projects: 
Saltcoats Place Framework £70,000
Largs Place Framework £70,000
Kilwinning Place Framework £70,000
Future Years Project Development £40,000 
Reduce the following in the VDLF: 
Development work to £160,000
12

Page 13

Replace with:
£410,000 (£250,000 Placed Based and £160,000 VDLF) to create a new High Street
Buyout Fund to deliver a Community Wealth Building approach to town centre
regeneration, aimed at bringing privately owned derelict sites into Council or
community ownership to be repurposed for the benefit of the community. This fund
would act as a delivery arm of the Place Frameworks and build on the projects
supported through the Repurposing Property Grant with further funding in future
years.” 
Thereafter, the Members who had requested the call-in were invited to speak.
Councillor McDonald advised that he would speak to this call-in request, with
Councillors Cullinane and Foster being available to answer any questions, if
required. He then addressed the Committee in support of the call-in request. 
The Chair then invited Councillor Gurney, as the Cabinet Member for Economy &
Climate Change, to address the meeting. He explained the reasoning for the
Cabinet decision and addressed matters raised by the call-in. 
The Senior Manager (Regeneration) referred to an updated briefing note from the
Executive Director (Place), provided at Appendix 2 to the report. 
Members asked questions of Councillors McDonald, Gurney and the Senior
Manager (Regeneration) and were provided with further information in relation to: 
• The reasons for seeking the change since the budget was agreed in March;
• Mechanisms for achieving owners to sell properties;
• The number of Compulsory Purchase Orders (CPOs) that had been carried
out in North Ayrshire during the last 10-year period; 
• The strict parameters and requirements that required to be met regarding
CPOs to allow them to be progressed in appropriate and specific
circumstances
• Delivery proposals; and
• The qualifying criteria for Vacant and Derelict Land Funding. 
Councillor Marshall, seconded by Councillor Collier, moved that the Committee
agree not to support the call-in request and that the previous decision of Cabinet
should stand. 
As an amendment, Councillor Sweeney, seconded by Councillor Bell, moved to
accept the terms of the call-in request. 
Thereafter, on a division and a roll call vote, there voted for the amendment,
Councillors Bell and Sweeney (2) and for the motion, Councillors Collier, Inglis,
Marshall, McLean and Murdoch (5), and the motion was declared carried. 
Accordingly, the Committee agreed not to support the call-in request. 
4. Call-In: North Ayrshire Covid Recovery Fund 
Submitted report by the Chief Executive on a call-in request received in respect of a
decision taken by Cabinet on 7 June 2022 on the North Ayrshire Covid Recovery
13

Page 14

Fund. The report to Cabinet, attached at Appendix 1 to the report, sought agreement
for the proposed North Ayrshire Economic COVID Recovery Fund Investment Plan.
An updated briefing note had been provided by the Executive Director (Place) and
was attached at Appendix 2 to the report. 
The Cabinet agreed to (a) note the Scottish Government’s recently announced
Economic Covid Recovery Fund, which would see an allocation of £2.154m for North
Ayrshire; and (b) approve the proposed North Ayrshire Economic COVID Recovery
Fund Investment Plan 
Subsequently, a call-in request was received from Councillors Foster, McDonald
and Cullinane in the following terms:- 
Reason for Call In 
“Given their dominance of the local bus market, the “Public Transport Travel
Scheme” is effectively a public subsidy for Stagecoach at a time when they are
cutting local services.” 
Desired Outcome 
“That we send a very strong public message to Stagecoach that the Council will not
accept their cuts to local bus services and therefore the £20,000 for the “Public
Transport Travel Scheme” be reallocated to support the North Ayrshire Fairer Food
Network.” 
Thereafter, the Members who had requested the call-in were invited to speak.
Councillor McDonald advised that he would speak to this call-in request, with
Councillors Cullinane and Foster being available to answer any questions, if
required. He then addressed the Committee in support of the call-in request. 
The Chair then invited Councillor Gurney, as the Cabinet Member for Economy &
Climate Change, to address the meeting. He explained the reasoning for the
Cabinet decision and addressed matters raised by the call-in. 
The Head of Service (Economic Development and Regeneration) referred to an
updated briefing note from the Executive Director (Place), provided at Appendix 2
to the report. 
Members asked questions of Councillors McDonald, Gurney and the Head of
Service (Economic Development and Regeneration)  and were provided with further
information in relation to: 
• The operation of the proposed scheme including identification of recipients
and providers;
• Other types of support available from third sector organisations including
assistance with travel; and
• Availability of supplies for foodbanks. 
Councillor McLean, seconded by Councillor Collier, moved that the Committee agree
not to support the call-in request and that the previous decision of Cabinet should
stand.
14

Page 15

As an amendment, Councillor Sweeney, seconded by Councillor Bell, moved to
accept the terms of the call-in request. 
Thereafter, on a division and a roll call vote, there voted for the amendment,
Councillors Bell and Sweeney (2) and for the motion, Councillors Collier, Marshall,
McLean and Murdoch (4), and the motion was declared carried. Due to a technical
issue, Councillor Inglis left the meeting prior to the roll call vote taking place. 
Accordingly, the Committee agreed not to support the call-in request. 
The meeting ended at 11.25 a.m. 
15

Page 16

16

Page 17

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: External Quality Assessment of Internal Audit by West
Dunbartonshire Council
Purpose: To inform the Committee of the findings of the recent external
review of Internal Audit carried out by West Dunbartonshire
Council.
Recommendation: It is proposed that the Committee: (a) notes the findings and
action plan from the review of Internal Audit; (b) notes the
positive nature of the assessment; and (c) records its thanks to
West Dunbartonshire Council Internal Audit for carrying out the
review.
1. Executive Summary
1.1 Internal Audit operates in accordance with the requirements of the 'Public Sector
Internal Audit Standards (PSIAS)'. The standards are designed to ensure that
common standards and practices are followed across all public sector bodies.
1.2 One requirement of the PSIAS is that the Internal Audit service should undergo an
external quality assessment, at least every 5 years.  The first assessment was
undertaken by Falkirk Council in 2017.
1.3 The second assessment has recently been undertaken by West Dunbartonshire
Council Internal Audit and this report presents the key findings and action plan.
2. Background
2.1 The PSIAS was introduced in April 2013 and requires all Internal Audit teams to
undergo an external quality assessment at least every 5 years; this can be either a full
external assessment or a self-assessment with independent validation.
2.2 The Scottish Local Authorities Chief Internal Auditors Group (SLACIAG) has
developed an external review network, where each participating Council Internal Audit
team will carry out a review of another authority, and will in turn be reviewed by
another, different Council.
Agenda Item 3
17

Page 18

2.3 The benefits of joining this network are the opportunity to share good operational
practice from elsewhere, both through being reviewed by another Council and by
carrying out a review elsewhere, and the absence of any financial cost. 
2.4 A review of the Council's Internal Audit team has recently been completed by the
Shared Service Manager (Audit & Fraud) from West Dunbartonshire Council and her
report is attached in full at Appendix 1. 
2.5 The review assessed the compliance of the Council's Internal Audit team with the 14
sections of the PSIAS and notes that the team fully conforms with 13 of the standards
and generally conforms with one. Overall the assessor has been able to provide
assurance that the Council's Internal Audit team complies with the requirements of the
PSIAS. 
2.6 The assessment is a very positive one. There are four low priority ‘routine’ actions for
implementation which will further improve compliance. The action plan is included
within Appendix 1. One action has already been completed. 
2.7 The Shared Service Manager (Audit & Fraud) will attend the Audit and Scrutiny
Committee to report on her findings. 
3. Proposals 
3.1 It is proposed that the Audit and Scrutiny Committee: (a) notes the findings and action
plan from the review of Internal Audit, (b) notes the positive nature of the assessment,
and (c) records its thanks to West Dunbartonshire Council Internal Audit for carrying
out the review. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
18

Page 19

Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation was required as part of this review. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
19

Page 20

June 2022 Page 1 
EXTERNAL QUALITY
ASSESSMENT 2
OF 
NORTH AYRSHIRE COUNCIL’S
INTERNAL AUDIT JULY 2022 
Final Report Recipients: 
Laura Miller, Senior Manager Audit, Fraud, Safety and Insurance (Chief
Audit Executive) 
20

Page 21

EXECUTIVE SUMMARY 
2
1.  INTRODUCTION 
1.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published initially in
April 2013 and updated most recently in March 2017, apply to all internal audit service
providers in the UK public sector, whether in-house, provided via a shared service
arrangement or outsourced. To supplement the PSIAS, and provide specific guidance
surrounding its application within a local government setting, the Chartered Institute of
Public Finance and Accountancy (CIPFA) compiled a Local Government Application
Note, which was last updated in 2019. 
1.2 The objectives of the PSIAS are to define the nature of internal auditing within the UK
public sector; set out basic principles for carrying out internal audit; establish a
framework for providing internal audit services, which add value to the organisation,
leading to improved organisational processes and operations; establish the basis for the
evaluation of internal audit performance and drive improvement planning. 
1.3 The PSIAS require the Chief Audit Executive (the Senior Manager, Audit, Fraud, Safety
and Insurance in North Ayrshire Council) to develop and maintain a quality assurance
and improvement programme (QAIP) that covers all aspects of the internal audit activity. 
The QAIP must include both periodic internal self-assessments and five-yearly external
assessments, carried out by a qualified, independent assessor from outwith the
organisation, and enable evaluation of the internal audit activity’s (Internal Audit service
in North Ayrshire Council) conformance with the PSIAS, including the Mission of Internal
Audit, Definition of Internal Auditing and Code of Ethics. In addition, the QAIP should
also assess the efficiency and effectiveness of the internal audit activity and identify
opportunities for improvement. 
1.4 To assist its members to meet the five-yearly external assessment requirement, the
Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG) established a
collaborative system of formal peer reviews.  This approach not only assists with
ensuring that independent assessors, and their teams, have appropriate knowledge and
experience of the local government internal audit environment but also removes the
financial burden from councils, associated with procuring these services externally.  The
allocation of assessors / assessment teams to councils participating in the peer review
process was undertaken autonomously, ensuring that, amongst other governing
principles, local authorities with perceived / known conflicts of interest could not review
one another.  At the outset, assessors were required to formally declare any interests
so that these could be appropriately addressed during the allocation process.  West
Dunbartonshire Council was selected to carry out the external assessment for North
Ayrshire Council.   
1.5 To support the peer review process, SLACIAG developed a comprehensive External
Quality Assessment (EQA) framework, including an EQA Checklist for Assessing
Conformance with the PSIAS and the Local Government Application Note (EQA
Checklist) and a key Stakeholder Questionnaire proforma. The external assessment of
North Ayrshire Council’s Internal Audit service has been carried out by West
Dunbartonshire Council’s Shared Service Manager – Audit & Fraud utilising this
framework.   
1.6 This report provides a high level summary of requirements for each standard per the
PSIAS and CIPFA Local Government Application Note and sets out the findings,
conclusions and recommendations from the external assessment, which involved
discussions with key members of staff, including the Chief Audit Executive, review of the
most recent self-assessment carried out utilising the EQA Checklist and consideration
of other relevant supporting documentation / information (Evidence Pack) including
working paper files and completed stakeholder questionnaires. A comprehensive list of
supporting documentation / information and completed stakeholder questionnaires
considered as part of the assessment can be found at appendices B and C respectively.
21

Page 22

June 2022 Page 1 
2.  OVERALL CONCLUSION
2.1 The overall conclusion of the external assessment is that North Ayrshire Council’s
Internal Audit service fully conforms with 13 areas of the Public Sector Internal Audit
Standards and generally conforms in relation to one area.  There were no areas
assessed as partial or non-conformance.  A summary of totals is set out in the
undernoted table and a full summary of assessment, by assessment area can be found
at Appendix A:   
Fully
Conforms     
Generally
Conforms     
Partially
Conforms     
Does Not
Conform   
TOTALS 13 1 0 0 
2.2 The main areas for improvement highlighted in the report are as follows: 
• The Internal Audit Charter could be enhanced to provide specific reference to the
Mission of Internal Audit.
• The Chief Audit Executive has recognised the need to improve the documentation of
the audit risk assessment process and the overall assurance process.  Consideration
should also be given to inclusion of the risk factors which have influenced the audit
plan in relation to the risk-based audit assurance work in the covering report.
• The Chief Audit Executive has recognised the need for referencing audit work to the
strategic and service risk registers within the audit programme.
• The Chief Audit Executive has recognised the need to include a specific section on
exclusions within the audit programme.  Consideration should also be given to
including exclusions where identified within the draft and final reports to management. 
2.3 Full details of the assessment recommendations and management responses can be
found in the Action Plan at Appendix D.  
3.  SECTION A – MISSION OF INTERNAL AUDIT AND CORE PRINCIPLES 
The PSIAS state that the Mission of Internal Audit articulates what internal audit aspires
to accomplish within an organisation, which is ‘to enhance and protect organisational
value by providing risk-based and objective assurance, advice and insight’.   
Taken as a whole, the Core Principles for the Professional Practice of Internal Auditing,
as set out in the PSIAS, articulate internal audit effectiveness.  For an internal audit
function to be considered effective, all Core Principles should be present and operating
effectively.  Failure to achieve any of the Core Principles would imply that an internal
audit activity was not as effective as it could be in achieving the Mission of Internal Audit. 
3.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used, along with specific consideration surrounding the achievement of the Core
Principles, to conclude that the Internal Audit service at North Ayrshire Council fully
conforms with accomplishing the Mission of Internal Audit as detailed above. 
4. SECTION B – DEFINITION OF INTERNAL AUDITING 
The PSIAS state that internal auditing is an independent, objective assurance and
consulting activity designed to add value and improve an organisation’s operations. It
helps an organisation accomplish its objectives by bringing a systematic, disciplined
approach to evaluate and improve the effectiveness of risk management, control and
governance processes. 
22

Page 23

4 
4.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used to conclude that the Internal Audit service at North Ayrshire Council fully
conforms with the definition of Internal Auditing as detailed above.   
5.  SECTION C – CODE OF ETHICS 
The PSIAS state that the purpose of the Institute of Internal Auditor’s Code of Ethics is
to promote an ethical culture in the profession of internal auditing. A code of ethics is
necessary and appropriate for the profession of internal auditing, founded as it is on the
trust placed in its objective assurance about risk management, control and governance. 
Internal auditors in UK public sector organisations must conform to the Code of Ethics
as set out in the PSIAS. If individual internal auditors have membership of another
professional body then he or she must also comply with the relevant requirements of
that organisation. 
5.1 Evidence obtained from assessing conformance with other standards in the PSIAS, in
particular the Attribute Standards 1000 – Purpose Authority and Responsibility, 1100 –
Independence and Objectivity, 1200 – Proficiency and Due Professional Care and
Professional Standards 2000 – Managing the Internal Audit Activity and 2300 –
Performing the Engagement, has been used to conclude that North Ayrshire Council’s
Internal Audit service fully conforms with the requirement to comply with the Code of
Ethics.   
6. SECTION D – ATTRIBUTE STANDARDS 
Attribute Standards apply to organisations and individual internal auditors
providing the internal audit services in a local authority. 
6.1 1000 - Purpose, Authority, and Responsibility 
The PSIAS state that the purpose, authority and responsibility of the internal audit
activity must be formally defined in an Internal Audit Charter, consistent with the Mission
of Internal Audit and the mandatory elements of the International Professional Practices
Framework.  The chief audit executive must periodically review the internal audit charter
and present it to senior management and the board for approval.  The internal audit
charter must also: 
• define the terms ‘board’ and ‘senior management’ for the purposes of internal audit
activity;
• cover the arrangements for appropriate resourcing; 
• define the role of internal audit in any fraud-related work; and 
• describe safeguards to limit impairments of independence or objectivity if internal
audit or the chief audit executive undertakes non-audit activities. 
6.1.1 North Ayrshire Council’s Internal Audit Charter is periodically reviewed with the most
recent review taking place in September 2020.  The Internal Audit Charter was approved
by the Audit & Scrutiny Committee on 29 September 2020. 
6.1.2 The internal self-assessment by the Chief Audit Executive at North Ayrshire Council
recognised that the current Internal Audit Charter does not specifically reference the
Mission of Internal Audit “To enhance and protect organisational value by providing risk-
based and objective assurance, advice and insight”.  However, this external assessment
considers that this is covered by the detail included at section 2 Responsibilities of
Internal Audit of the Internal Audit Charter. 
6.1.3 The Chief Audit Executive has already considered, as an enhancement, the inclusion of
specific reference to the Mission of Internal Audit when the Internal Audit Charter is next
reviewed. 
23

Page 24

5 
6.1.4 Having considered the findings above, it has been concluded that the Internal Audit
service at North Ayrshire Council fully conforms with Standard 1000 on Purpose,
Authority and Responsibility. 
6.2 1100 - Independence and Objectivity 
The internal audit activity must be independent and internal auditors must be objective
in performing their work.  Various aspects of independence and objectivity are covered
in this standard as well as 1200, including reporting functional lines of the CAE, the
relationship between the CAE and the board and any impairment to individual internal
auditors’ objectivity or independence. Reporting and management arrangements must
be put in place that preserve the CAE’s independence and objectivity, in particular with
regard to the principle that the CAE must be independent of the audited activities. 
6.2.1 The Chief Audit Executive reports functionally to the Audit & Scrutiny Committee and
administratively to the Head of Finance, who is a member of the Council’s Executive
Leadership Team.  The Chief Audit Executive has direct and unrestricted access to the
Chief Executive and the Chair of the Audit & Scrutiny Committee and this has been
confirmed through the Terms of Reference for the Audit & Scrutiny Committee.  These
reporting/access arrangements are clearly defined in the Internal Audit Charter as are
safeguards to limit impairment of independence or objectivity.   
6.2.2 In support of organisational independence, the Chief Audit Executive attends Audit &
Scrutiny Committee meetings to present all internal audit reports (including, for example,
the Internal Audit Charter, Annual Report, Internal Audit Plan and reports / executive
summaries from the planned audits) to Elected Members.  The reports are all submitted 
in the Head of Service’s name with the Chief Audit Executive’s information listed as a
contact for further information.  Through observation of Audit & Scrutiny Committee
meetings held via webcast during 2021/22 it was noted that the Chief Audit Executive
attends each Audit & Scrutiny Committee and presented all internal audit reports at the
meeting. 
6.2.3 The Chief Audit Executive has operational responsibility for some activities subject to
audit and this is communicated to stakeholders via the Internal Audit Charter which sets
out the procedure whereby the Chief Audit Executive is the client and the Team Manager
is responsible for the oversight and reporting of the audit work to mitigate any
impairments.   
6.2.4 All staff within the Internal Audit service are required to complete a register of interests
form on an annual basis.   
6.2.5 North Ayrshire Council’s Internal Audit service fully conforms with Standard 1100 on
Independence and Objectivity. 
6.3 1200 - Proficiency and Due Professional Care 
The CAE must be professionally qualified, suitably experienced and responsible, in
accordance with the organisation’s human resources processes, for recruiting
appropriate staff.  He or she is responsible for ensuring that up-to-date job descriptions
exist, reflecting roles and responsibilities, and that person specifications define the
required qualifications, competencies, skills, experience and personal attributes. 
The CAE should periodically assess individual auditors’ skills and competencies against
those set out in the relevant job descriptions and person specifications. Any training or
development needs identified should be included in an appropriate ongoing
development programme that is recorded and regularly reviewed and monitored. In
addition, all internal auditors have a personal responsibility to undertake a programme
of continuing professional development (CPD) to maintain and develop their
competence. This may be fulfilled through requirements set by professional bodies or
24

Page 25

6 
through the organisation’s own appraisal and development programme. Auditors should
maintain a record of such professional training and development activities. 
The internal audit activity should be appropriately resourced to meet its objectives. It
should have appropriate numbers of staff in terms of grades, qualifications, personal
attributes and experience or have access to appropriate resources in order to meet its
objectives and to comply with these standards. The PSIAS states that the CAE must
obtain competent advice and assistance if the activity is unable to perform all or part of
an engagement. 
6.3.1 The Chief Audit Executive holds a relevant professional qualification (ACCA) and is
suitably experienced, with 14 years internal audit experience within a Scottish local
government environment.  The Chief Audit Executive is a member of SLACIAG (or
otherwise) and regularly attends and contributes to meetings.  In relation to the two
SLACIAG Sub-groups, the Computer Audit Sub-Group (CASG) and the Scottish Local
Authorities Investigators Group (SLAIG), North Ayrshire Council’s Internal Audit service
is represented on both.   
6.3.2 To support the Chief Audit Executive in North Ayrshire Council’s Internal Audit service,
a Team Manager is in place for Internal Audit, a Team Supervisor for Fraud, a Team
Manager for Safety, and a Team Manager for Risk & Insurance.  There are a total of 18
members of staff in the Internal Audit service, including the Chief Audit Executive, Team
Managers/Supervisors.  The Internal Audit service delivers internal audit services to
North Ayrshire Council and North Ayrshire Integration Joint Board.  The team has
dedicated IT audit and fraud resources.       
6.3.3 The Internal Audit service has an appraisal process “Our Time to Talk” which is a
corporate process.  This is carried out on an annual basis and in in place for Internal
audit staff.     
6.3.4 The Internal Audit service is represented on a number of corporate groups, including the
Municipalisation Working Group, Chris21 HR/Payroll System Project Board, and the
O365 Information and Collaboration Project Board. 
6.3.5 The Chief Audit Executive and all members of the Internal Audit service have specific
CPD requirements to adhere to.  Staff training records are maintained on the corporate
HR system.     
6.3.6 Throughout 2021-22, Audit & Scrutiny meetings were subject to live webcasting.  These
webcasts are also available as archive webcasts which were reviewed as part of the
external quality assessment where it was observed that the Chief Audit Executive
demonstrated sufficient knowledge and experience and that all members of the Internal
Audit service had exercised due professional care.   
6.3.7 North Ayrshire Council’s Internal Audit service fully conforms with standard 1200 on
Proficiency and Due Professional Care. 
6.4 1300 - Quality Assurance and Improvement Programme 
The PSIAS state that the Chief Audit Executive must develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the internal
audit activity. 
The QAIP must include both periodic internal self-assessments and five-yearly external
assessments, carried out by a qualified, independent assessor from outside the
organisation, and enable evaluation of the internal audit activity’s conformance with the
PSIAS, including the Definition of Internal Auditing and Code of Ethics. In addition, the
QAIP should also assess the efficiency and effectiveness of the internal audit activity
and identify opportunities for improvement. 
25

Page 26

7 
The public sector requirement in the PSIAS states that results of the QAIP and progress
against any improvement plans must be reported in the annual report. 
6.4.1 Internal audit reports are reviewed by the Chief Audit Executive prior to issue and
working papers are, in general, reviewed by the Chief Audit Executive or Audit Manager. 
Where the assignment is carried out by the Audit Manager, the Chief Audit Executive
will review the working paper file.   
6.4.2 Client feedback is actively pursued by the Internal Audit service for assignments carried
out within North Ayrshire Council. 
6.4.3 A range of performance measures are in place for the Internal Audit service which aligns
to balanced scorecard reporting of performance by the Institute of Internal Auditors. 
These are formally reported to the Audit & Scrutiny Committee on an annual basis as
part of the Internal Audit Annual Report. 
6.4.4 A formal self-assessment of conformance with the PSIAS was carried out in September
2021, using the EQA Checklist.  This was used by West Dunbartonshire Council as the
baseline for the external quality assessment in 2022. 
6.4.5 North Ayrshire Council’s Internal Audit service fully conforms with Standard 1300 on
Quality Assurance and Improvement Programme. 
7. SECTION E – PERFORMANCE STANDARDS 
Performance Standards describe the nature of the internal audit services being
provided and provide criteria against which the performance of an internal audit
function can be measured. 
7.1 2000 - Managing the Internal Audit Activity 
The chief audit executive must effectively manage the internal audit activity to ensure it
adds value to the organisation.  The internal audit activity is effectively managed when
it achieves the purpose and responsibility included in the internal audit charter, it
conforms with the PSIAS, its individual members conform with the Code of Ethics and
the PSIAS and it considers trends and emerging issues that could impact the
organisation.  The internal audit activity adds value to the organisation and its
stakeholders when it considers strategies, objectives and risks; strives to offer ways to
enhance governance, risk management, and control processes; and objectively
provides relevant assurance. 
7.1.1 An annual Internal Audit Plan is compiled by the Chief Audit Executive outlining the
planned programme of work to be undertaken.  The planning process includes
consultation with members of the Executive Leadership Team on planned audit areas,
a review of strategic and service risk registers, discussions with external audit to
minimise duplication and maximise audit coverage for the Council and review of other
local authority internal audit plans through wider discussion groups.   
7.1.2 The annual Internal Audit Plan is presented to the Audit and Scrutiny Committee for
approval. 
7.1.3 Progress towards completion of the Internal Audit Plan, and the individual audits
contained within it is reported to Audit & Scrutiny Committee as an update to each
meeting of the Committee. 
7.1.4 The Internal Audit Plan for 2021-22 was presented to the January 2021 meeting of the
Audit & Scrutiny Committee and good engagement was observed by the Committee
Members in discharging their scrutiny role of the proposed audit coverage.
26

Page 27

8 
7.1.5 Through review of the Internal Audit Plan for 2021-22 an area for improvement was
identified in relation to including the risk factors which have influenced the scope of the
areas subject to risk-based audit assurance work within the covering report.  The Chief
Audit Executive also recognised that the documentation of audit risk assessment and
overall assurance mapping process could be improved. 
7.1.6 It is recommended that consideration is given to include the risk factors which have
influenced the scope of the risk-based plan within the covering report relating to the
Annual Audit Plan.  It is also recognised that the Chief Audit Executive plans to improve
the documented audit risk assessment and assurance mapping process. 
7.1.7 North Ayrshire Council’s Internal Audit service generally conforms with Standard 2000
on Managing the Internal Audit Activity. 
7.2 2100 - Nature of Work 
The internal audit activity must evaluate and contribute to the improvement of the
organisation’s governance, risk management, and control processes using a systematic,
disciplined, and risk-based approach. Internal audit credibility and value are enhanced
when auditors are proactive and their evaluations offer new insights and consider future
impact. 
More specifically, the internal audit activity must assess and make appropriate
recommendations to improve the organisation’s governance processes, evaluate the
effectiveness and contribute to the improvement of risk management processes and
assist the organisation in maintaining effective controls by evaluating their efficiency and
effectiveness and promoting continuous improvement. 
7.2.1 It was recognised that the Chief Audit Executive plans to enhance the audit planning
process by specifically referencing audit work to strategic and service risk registers. 
7.2.2 North Ayrshire Council’s Internal Audit fully conforms with Standard 2100 on Nature of
Work. 
7.3 2200 - Engagement Planning 
Internal auditors must develop and document a plan for each engagement, including the
engagement’s objectives, scope, timing and resource allocations. The plan must
consider the organisation’s strategies, objectives and risks relevant to the engagement. 
The CIPFA Local Government Application note states that for each engagement, a brief
should be prepared, discussed and agreed with relevant managers. The brief should
establish the objectives, scope and timing for the assignment and its resource and
reporting requirements. Audit work should be undertaken using a risk-based audit
approach. 
7.3.1 A standard methodology is in place for Internal Audit engagement planning which
includes an audit programme which sets out the background to the area being audited,
the risks, the timing of the audit, the audit resource, the report distribution, the audit test
objectives and conclusions reached. 
7.3.2 North Ayrshire Council’s Internal Audit service fully conforms with Standard 2200 on
Engagement Planning. 
7.4 2300 - Performing the Engagement 
Internal auditors must identify, analyse, evaluate and document sufficient information to
achieve the engagement’s objectives. 
At each stage of the audit, auditors should consider what specific work needs to be
conducted and evidence needs to be gathered to achieve the engagement objectives
and support an independent and objective audit opinion.  Systems should be in place to
27

Page 28

9 
ensure that auditors obtain and record, within the working papers, sufficient evidence to
support their conclusions, professional judgements and recommendations.  Working
papers should always be sufficiently complete and detailed to enable an experienced
internal auditor with no previous connection with the audit to ascertain what work was
performed, re-perform it if necessary and support the conclusions reached.  The CAE
should also specify how long all audit documentation should be retained, whether held
on paper or electronically.  All audit work should be subject to an appropriate internal
quality review process. 
Internal auditors must be alert to the possibility of intentional wrongdoing, errors and
omissions, poor value for money, failure to comply with management policy and conflicts
of interest when performing their individual audits. They must also have sufficient
knowledge to identify indicators that fraud or corruption may have been committed. 
7.4.1 Internal Audit Manual sets out the procedure in relation to undertaking a planned audit,
including preparing working papers and setting up working paper files.  In addition, the
manual also includes standard procedures in place for dealing with other types of work
e.g. advice and consultancy and investigating fraud and irregularity.   
7.4.2 Standard working papers are used at each stage of the audit.  Templates are referenced
within the Internal Audit Manual.   
7.4.3 During the course of each audit, regular discussions take place between the team
carrying out the assignment and the Chief Audit Executive or Team Manager. This
ensures that any significant issues are escalated appropriately and that the audit is on
track to be delivered on time and within budget. 
7.4.4 All working papers are subject to review by either the Chief Audit Executive or the Audit
Manager.  This quality control process ensures that the risks and objectives of the
assignment have been met and that conclusions are suitably evidenced. 
7.4.5 A records retention and disposal schedule is in place for Internal Audit files which sets
out the legal basis for retention and the timescales.           
7.4.6 North Ayrshire Council’s Internal Audit service fully conforms with Standard 2300 on
Performing the Engagement. 
7.5 2400 - Communicating Results 
The basic aims of every internal audit report should be to: 
• give an opinion on the risk and controls of the area under review, building up to the
annual opinion on the overall adequacy and effectiveness of the organisation’s
framework of governance, risk management and control;
• prompt management to implement the agreed actions for change leading to
improvement in the control environment and performance; and
• provide a formal record of points arising from the audit and, where appropriate, of
agreements reached with management, together with appropriate timescales. 
Each report should include the scope and purpose of the audit to help the reader to
understand the extent, or limitations, of the assurance(s) provided by the report.  During
the course of the audit, key issues should be brought to the attention of the relevant
manager to enable them to take corrective action and to avoid surprises at the closure
stage.  Before issuing the final report, the internal auditor should normally discuss the
contents with the appropriate levels of management to confirm the factual accuracy, to
seek comments and to confirm the agreed management actions. A draft report is useful
for this purpose.  Recommendations should be prioritised according to risk. The
recommendations and the resultant management action plans should be agreed prior to
the issue of the final report.  Any areas of disagreement between the internal auditor and
management that cannot be resolved by discussion should be recorded in the action
28

Page 29

10 
plan and the residual risk highlighted.  Those weaknesses giving rise to significant risks
that are not agreed should be brought to the attention of a more senior level of
management and the board. 
As set out in the PSIAS, the CAE must deliver an annual internal audit opinion and report
that can be used by the organisation to inform its annual governance statement. This
must include the annual internal audit opinion concluding on the overall adequacy and
effectiveness of the organisation’s governance, risk and control framework, a summary
of the audit work from which the opinion is derived (including reliance placed on work by
other assurance bodies); and a statement of conformance with the PSIAS and the
results of the internal audit QAIP. 
7.5.1 A standard report template is used for all audit assignments.  The report includes
background to the area being audited, the objectives and scope of the audit, the findings
and agreed actions together with responsible owners and implementation dates.  The
audit report also sets out the overall opinion on the level of assurance that is being
provided.   
7.5.2 Draft reports are discussed with the client service to agree factual accuracy as well as
allow the client to respond to recommendations with implementation dates and details
of responsible officers. 
7.5.3 The overall level of assurance for the audit area is included in the overall Internal Audit
Annual Report which allows the Chief Audit Executive to provide an overall opinion on
the adequacy and effectiveness of the Council’s governance, risk management and
control processes for that year.     
7.5.4 The Chief Audit Executive through the self-assessment exercise identified that
exclusions to the scope of the audit assignment could be more explicit within the audit
programme.  We would also recommend that any exclusions are also included in the
draft and final reports to management.   
7.5.5 Through observation of Audit & Scrutiny Committee meetings held via webcasting it was
demonstrated that senior management value the work of Internal Audit and are
committed to improving the control environment through the implementation of internal
audit actions. 
7.5.6 North Ayrshire Council’s Internal Audit fully conforms with Standard 2400 on
Communicating Results. 
7.6 2500 - Monitoring Progress 
The PSIAS place responsibility for monitoring progress with the CAE to ensure that
management actions have been effectively implemented or, if not, that senior
management have accepted the risk of not taking action.  The CAE must, therefore,
implement a follow-up process for ensuring the effective implementation of audit results
or ensuring senior management are aware of the consequences of not implementing an
action point and are prepared to accept the risk of such consequences occurring. The
results of this process should be communicated to the board.  The CAE should develop
escalation procedures for cases where agreed actions have not been effectively
implemented by the date agreed. These procedures should ensure that the risks of not
taking action have been understood and accepted at a sufficiently senior management
level. The effective involvement of the board in the follow-up process is critical to
ensuring that it works. The CAE should consider revising the internal audit opinion in
light of findings from the follow-up process.  The findings of follow-up reviews should
inform the planning of future audit work. 
7.6.1 The Internal Audit Manual sets out the process for audit follow up.  The completed action
plan for each audit is monitored for completion through the Council’s performance
29

Page 30

11 
management system Pentana.   As part of the quarterly reporting to the Audit & Scrutiny
Committee, information is provided on actions which have not been completed within
the agreed timescales.  Evidence obtained by Internal Audit in relation to audit follow up
is retained on the shared drive in accordance with relevant retention and disposal
timescales. 
7.6.2 Through observation of Audit & Scrutiny Committee meetings held via webcasting, it
was demonstrated that there is effective challenge and scrutiny by Elected Members in
relation to progress in implementing Internal Audit action plans. 
7.6.3 North Ayrshire Council’s Internal Audit service fully conforms with Standard 2500 on
Monitoring Progress. 
7.7 2600 - Communicating the Acceptance of Risks 
When the chief audit executive concludes that management has accepted a level of risk
that may be unacceptable to the organisation, they must discuss the matter with senior
management. If the chief audit executive determines that the matter has not been
resolved, they must communicate the matter to the board. It is not the responsibility of
the chief audit executive to resolve the risk. 
7.7.1 Management comments are added to each finding and where no action is proposed this
is included within the action plan. 
7.7.2 Where the Chief Audit Executive determines any risk to be significant, this would be
raised with the Chief Executive, S95 Officer and the Chair of the Audit & Scrutiny
Committee.   
7.7.3 The Internal Audit Annual Report for 2021-22 fully sets out the scope of internal audit
responsibilities to provide an opinion on the Council’s governance, risk management
and control procedures.  The report did not highlight any concerns regarding
management’s acceptance of risk which required to be brought to the attention of the
Committee. 
7.7.4 North Ayrshire Council’s Internal Audit service fully conforms to the Standard on
Communicating the Acceptance of Risk. 
Andi Priestman
Shared Service Manager – Audit & Fraud
West Dunbartonshire Council
July 2022
30

Page 31

12 
APPENDIX A – SUMMARY OF ASSESSMENT 
REF PAGE
No. ASSESSMENT AREA
Fully
Conforms 
Generally
Conforms 
Partially
Conforms 
Does Not
Conform 
Section A  Mission of Internal Audit and Core Principles    
Section B  Definition of Internal Auditing    
Section C  Code of Ethics    
Section D  ATTRIBUTE STANDARDS 
1000  Purpose, Authority and Responsibility    
1100  Independence and Objectivity    
1200  Proficiency and Due Professional Care    
1300  Quality Assurance and Improvement Programme    
Section E  PERFORMANCE STANDARDS 
2000  Managing the internal Audit Activity    
2100  Nature of Work    
2200  Engagement Planning    
2300  Performing the Engagement    
2400  Communicating Results    
2500  Monitoring Progress    
2600  Communicating the Acceptance of Risks    
TOTALS 13 1  
31

Page 32

13 
APPENDIX B – EVIDENCE PACK
• North Ayrshire Council PSIAS Self-Assessment 2021-22
• Internal Audit Charter 2020-22
• Financial Regulations December 2020
• Minutes of Audit & Scrutiny Committee September 2020
• Minutes of Audit & Scrutiny Committee 
• Scheme of Administration June 2021
• Internal Audit Structure Chart
• Internal Audit Job Descriptions
• Internal Audit Professional Qualifications
• Internal Audit Training Records
• Internal Audit Annual Reports 2020-21 and 2021-22
• NAC Recruitment Policy
• NAC Disciplinary Policy
• NAC Performance Appraisal Process
• NAC Code of Conduct for Employees
• Staff Register of Interests
• NAC Information Security Policy
• NAC Data Protection Policy
• NAC Whistleblowing Policy
• NAC Defalcation Procedures
• NAC Counter Fraud and Corruption Strategy
• Internal Audit Manual 2021/22
• Internal Audit Annual Audit Plan 2021/22
• Mid-Year review of Internal Audit Annual Audit Plan 2021/22
• Budget Monitoring Report example
• 6-monthly survey process
• EQA 1
• Annual Governance Statement 2020-21
• IJB PAC Minutes June 2021
• Audit Universe
• Audit File Checklist
• Audit Programme Template
• Draft Report Template
• File Review Template
• Retention Schedule
• Audit Actions Follow Up Report 
32

Page 33

14 
APPENDIX C – STAKEHOLDER QUESTIONNAIRES
Due to the ongoing Coronavirus restrictions, stakeholder engagement was considered through
reviewing archived webcasting of Audit & Scrutiny Committees meetings held during 2021 to
2022 where it was observed that there is good engagement and challenge and also
recognition of the support and value that is added to the organisation by the Internal Audit
service by both Elected Members and senior management.
33

Page 34

15 
APPENDIX D – ACTION PLAN
No.  Para  Recommendation  Management Response  Responsible Officer
/ Agreed
Completion Date 
1
6.1.3 The Internal Audit Charter should be enhanced to provide
specific reference to the “Mission of Internal Audit” at its next
review.
This will be incorporated into the next iteration of the Internal
Audit Charter, which is due for review at the next audit planning
round for 2023/24.
Laura Miller, CAE 
31 March 2023
2
7.1.5 The Chief Audit Executive has recognised the need to
improve the documentation of the audit risk assessment
process and the overall assurance process. 
Consideration should also be given to the inclusion of the risk
factors which have influenced the audit plan in relation to the
risk-based audit assurance work in the covering report.
Work commenced to improve the documentation of the risk
assessment at the 2022/23 audit planning process. In addition,
the overall assurance process was also more fully
documented at the time the annual internal audit report and
opinion for 2021/22 was produced. 
Further action will also be taken during the 2023/24 internal
audit planning process to document the risk factors which have
influenced the audit plan and ensuring these are referenced
within the covering report.
Laura Miller, CAE 
31 March 2023
3
7.2.1 The Chief Audit Executive has recognised the need for
referencing audit work to the strategic and service risk
registers within the audit planning process.
The audit universe was amended for the 2022/23 audit
planning process to include reference to the strategic and
service risk registers.
Laura Miller, CAE 
Complete
4
7.5.4 The Chief Audit Executive has recognised the need to
include a specific section on exclusions within the audit
programme. 
It is recommended that where exclusions are identified that
these are also included in the draft and final reports issued
to management.
Standard templates relating to the audit engagement (the audit
programme and the audit report) will be amended to capture
the need to document exclusions from the scope of the audit. 
This will also be reflected in the Audit Manual.
Laura Miller, CAE 
30 September 2022 
Critical 
Significant 
Routine 
34

Page 35

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Accounts Commission’s Report: Local Government in
Scotland: Overview 2022
Purpose: To inform the Audit and Scrutiny Committee of the findings of
the recently published report.
Recommendation: That the Committee (i) notes the findings of the Accounts
Commission report, (ii) notes the recommendation contained
therein; and (iii) notes North Ayrshire Council’s current
approach in relation to each.
1. Executive Summary
1.1 The Accounts Commission recently published its national report ‘Local Government in
Scotland: Overview 2022’. This report reflects on the evolving and long-term nature of
the impact of the Covid-19 pandemic, considers the second year of the pandemic,
building on last year’s review of the initial response of Councils to the challenges, and
assesses the ongoing impact of Covid-19 and Councils’ progress towards recovery
and renewal. A link to the full report is attached as follows:
Local Government in Scotland 2022
1.2  Throughout the report, the Accounts Commissions has identified a number of key
messages in relation to Councils’ response to the pandemic and made
recommendations on future actions for Council leadership in relation to “Organising
the Council” and “Meeting local needs”.
2. Background
2.1 The Accounts Commission has published a national report, ‘Local Government in
Scotland: Overview 2022’, which reflects on the impact of the Covid-19 pandemic and
assesses Councils’ progress towards recovery and renewal. 
2.2 The Local Government in Scotland: Overview 2022 is based on evidence gathered
from a range of local and national audit work carried out throughout the year and
includes data and information to the end of February 2022. 
Agenda Item 4
35

Page 36

2.3  The report identifies a number of key messages in relation to Councils’ response to
the pandemic, including: 
• Councils have had a very difficult year:
Alongside the ongoing response to the pandemic, councils have faced challenges in
recovering services, dealing with increased demand and backlogs, and meeting
community needs and expectations. This has taken place against a backdrop of
long-standing pressures such as increased demand from an ageing population and
rising poverty. 
• The challenging context means collaborative leadership is more important
than ever:
Councils are operating in a difficult and uncertain strategic context and face longer-
term financial pressures, a lack of certainty and flexibility over long-term funding, and
the prospect of major service reforms. This challenging context needs local
government leaders skilled in effective strategic thinking, decision-making and
collaborative working, and able to learn lessons from new ways of working.
Collaborative leadership is more important than ever as councils work with partners,
communities, and citizens to support recovery and improve outcomes. 
• Pressures on the local government workforce continues:
Councils are continuing to experience high absence levels. Impacts on staff
wellbeing and skills shortages, particularly in front-line workers, have also been
noted. A resilient workforce is critical to the ongoing response to Covid-19 and the
recovery of services. Workforce plans will need to be updated, considering lessons
learned from new ways of working. Wellbeing support for the workforce must also
continue. 
• The impact of the pandemic and service disruption have been felt most
strongly by those already experiencing inequality:
Councils have worked hard and adapted to maintain service delivery but not all
services are back at pre-pandemic levels so those most in need of support are still
being affected. Councils must evaluate these impacts so that recovery and renewal
supports those most affected and addresses inequalities. Recovery and renewal
should also reflect the wider ambitions of the public service reform agenda. 
• The early response showed what could be achieved by working closely with
communities and the voluntary sector:
This momentum may be lost if communities and the voluntary sector are not involved
in shaping recovery. Flexible governance and decision-making structures will be
needed, as will opportunities for more local participation. 
• Improvements are needed in data availability, tools and skills to support
performance monitoring, strategic decision-making and planning service
improvements:
Data has been important in guiding the response to the pandemic but there are key
areas where a lack of data could hamper recovery, such as unmet needs, service
demands and backlogs. Data is a key tool in tackling inequality but there are gaps in
equality data, particularly at a local level. 
36

Page 37

2.4 The report makes a number of recommendations in relation to Council organisation,
including:  
Recommendation North Ayrshire Council Response
Councils together with their partners and
communities should revise their strategic
plans, including Local Outcomes
Improvement Plans to realign priorities
and provide a roadmap for recovery and
renewal. They should also consider how
this contributes to the national recovery
strategy set out by the Scottish
Government.
The 2019-24 Council Plan was approved
in June 2019. The Plan describes our
vision, mission and priorities and sets
out a strategic approach which is
focused on making North Ayrshire a
fairer and more equal society. 
Regular Council Plan progress reports
are considered by members and include
detailed updates on Covid-19 recovery
and renewal support activity. 
The Council Plan aligns with the Local
Outcomes Improvement Plan, which
sets out how we will work with other
public, private and voluntary
organisations and groups to achieve our
key priorities. 
Work on the new Council Plan has
already started and will include
extensive consultation with communities
and agencies. The Council’s
Administration has identified initial key
priorities across Poverty and cost of
living, Communities and climate change. 
Elected members and senior managers
need to work together to drive change,
make decisions and deliver recovery and
renewal. 
The Council’s strong leadership, which
was demonstrated in the collaborative
response to Covid-19, has been
recognised by our external auditors in
their annual audit reports and the Best
Value Assurance Report. Recovery and
Renewal Investment of £14.744m was
approved in June 2021. 
Councils should consider the leadership
skills needed for now and in future. This
includes clear succession planning
arrangements and a structured
programme of induction for new elected
members.
Our workforce planning approach
utilises a variety of tools and techniques,
including succession planning and
strategic leadership development
programmes. 
A development programme is in place
for all Elected Members and a full
Member’s induction programme took
place during May 2022 for all recently
elected Members. 
37

Page 38

Councils’ governance arrangements
should ensure that their elected
members have sufficient information to
support the scrutiny and decision-making
needed for recovery and renewal.
The Council’s Scheme of Administration,
Standing Orders Relating to Meetings,
Scheme of Delegation and Other Key
Governance documents were reviewed 
and approved by Council in May 2022.
The Council also undertakes self-
evaluation through toolkits and this has
been evidenced through the Audit and
Scrutiny Committee. 
Councils need to clearly set out how they
are evaluating new service models and
learning lessons from the response to
Covid-19.
We have developed our Sustainable
Change Programme, aligned to the
Council priorities and the Council
Transformation themes and set within
the context of the Council Plan and
Community Wealth Building Strategy,
with the objective of developing a
pipeline of projects that will deliver
improved outcomes, meet the Council’s
environmental ambitions, and deliver
financial efficiencies. 
Councils should have a clear plan for
developing the use of data in their
councils, this includes data skills, data
standards and data tools.
The Council’s Performance
Management Strategy 2021-24 outlines
how the Council’s performance
management supports a culture of
continuous improvement in order to
achieve the best outcomes for the
people of North Ayrshire. Our Annual
Performance Reports detail progress
against our Council Plan Performance
Framework and Delivery Plan. 
Councils must ensure that financial plans
and overarching recovery strategies and
actions are clearly aligned, including
funding to deliver on their duty to
address inequalities.
Our Recovery & Renewal Strategy sets
out a series of key principles and
themes to enable North Ayrshire Council
to recover and renew its services in a
prioritised way, ensuring they meet
resident needs. 
As part of our Financial Recovery Plan,
our Recovery and Renewal Fund
identified £14.744m to address
economic recovery, environmental
initiatives, support for vulnerable
families, citizens and communities,
sustainable investment on infrastructure
and open spaces and investment in
mental health and wellbeing. This
included a £3m contribution to our
Community Investment Fund to support
38

Page 39

recovery and renewal across our
communities. 
Our Economic Recovery and Renewal
Approach was agreed in September
2020 to support businesses and social
enterprises to rebuild, diversify and
become more resilient, green and
inclusive. 
Councils must have clear plans for
management of reserves.
Our utilisation of reserves, both
earmarked and unearmarked are
reported to elected members throughout
the financial year with an annual review
of appropriate reserves levels reported
to members as part of the annual budget
setting and annual accounts processes. 
Councils should update their workforce
plans to build on lessons learned,
address skills gaps and build a resilient
workforce for the future. This will include
monitoring the wellbeing of the
workforce, and the effectiveness of
health and wellbeing initiatives.
Our workforce planning approach
utilises a variety of tools and techniques
to ensure our workforce requirements for
the future, in terms of skills and
capabilities, are planned. Each Head of
Service has a workforce plan, and these
are monitored six-monthly with
continued HR support and guidance to
ensure service review and redesign of
the workforce is on track. 
2.5 The Accounts Commission report also makes several recommendations in relation to
“Meeting local needs”, including: 
Recommendation North Ayrshire Council Response
While some progress has been made in
improving the use of data in decision-
making, councils need to have a clear
sense of where increased demand and
service backlogs exist so that they can
identify areas of high risk and direct
resources accordingly. This information
also needs to be more transparent and
publicly available.
Our Annual Performance Reports detail
progress against our Council Plan which
is supported by 34 performance
indicators and 41 actions. More detailed
information is provided through half
yearly Council Pan Progress reports and
our North Ayrshire Performance
Dashboard, which is publicly available
on  our website and includes details of
our nationally comparable LGBF
indicators. 
A key priority for councils’ recovery and
renewal is assessing the impact of the
pandemic and service disruption on the
most vulnerable and learning from this to
inform how they support those most
affected and address inequalities. This
Community engagement sessions,
carried out to support the development
of our annual budget programme, have
been used to help shape our
Transformation and Renewal
programme and will continue to
39

Page 40

will need better local data to improve
understanding.
influence the structure of current and
future service delivery. 
The North Ayrshire Community
Engagement Toolkit/ Hub has been
developed to support and promote
effective community engagement
practice carried out across North
Ayrshire by the Community Planning
Partnership (CPP), the Health and
Social Care Partnership (HSCP), and
their respective Locality Partnerships
and Locality Forums. 
Where councils plan to continue with the
changes made to services during the
pandemic, they need to conduct impact
assessments and consult the
community. With the expansion of digital
services, councils need to assess and
mitigate the impacts of digital exclusion.
Our Community Learning and
Development Plan for 2021-24 was
approved in September 2021 and sets
out how we will support each of our
localities by providing digital learning
and career support, address poverty
including food insecurity and, by doing
so, improve the life chances of our
residents. 
This has been further supported by the
allocation of £0.250m of investment to
support the recruitment of a Digital
Officer to support the digital strategy
review following the pandemic. 
Councils need to ensure that partnership
working forged in the pandemic with their
communities, partners and the voluntary
sector remains in place. They also need
to learn what made it work and harness
this to transform future engagement. The
momentum and energy from
communities may be lost if public bodies
don’t capitalise on what has been
achieved.
Throughout our Recovery & Renewal
Strategy is the key theme that
communities need to be at the heart of
what we do. This is an opportunity to
build on the strong partnership working
already in place with our communities
and to continue to actively involve them
in the design of new service delivery
models. 
This will be achieved through an
increase in the use of participatory
approaches, including Participatory
Budgeting, and through Design
Experiments. Key to the ongoing
success in community engagement is
through maintaining the locality based
community hub support model of
approach which has been key in
supporting communities. 
40

Page 41

3. Proposals 
3.1 It is proposed that the Committee (i) notes the findings of the Accounts Commission
report, (ii) notes the recommendation contained therein; and (iii) notes North Ayrshire
Council’s current approach in relation to each.
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation has been required in the preparation of this report 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
Accounts Commission’s Report: Local Government in Scotland: Overview 2021, Audit and
Scrutiny Committee, 16 November 2021
41

Page 42

42

Page 43

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit Annual Update Report – North Ayrshire
Integration Joint Board (IJB)
Purpose: To inform the Committee of the IJB’s annual report for 2021/22
and the approved internal audit plan for 2022/23.
Recommendation: That the Committee notes the IJB annual report and approved
internal audit plan.
1. Executive Summary
1.1 Section 21.7 of the North Ayrshire Integration Joint Board’s Financial Regulations
states: “The Integration Joint Board Chief Internal Auditor will submit an annual audit
report of the Internal Audit function to the Chief Officer and the Performance and Audit
Committee indicating the extent of audit cover achieved and providing a summary of
audit activity during the year. As a minimum the annual audit report and Chief Internal
Auditor’s opinion will also be reported to the Audit Committees of the NHS Ayrshire &
Arran Board and North Ayrshire Council”.
1.2 The remit of the IJB’s Performance and Audit Committee (PAC) includes the review of
the overall internal control arrangements of NAIJB.  The IJB annual report for 2021/22
and the proposed internal audit plan for 2022/23 were provided to the PAC on 24 June
2022.
1.3 The annual report and audit plan will also be provided for information to the Audit and
Risk Committee of NHS Ayrshire and Arran on 23 November 2022.
2. Background
Annual Report 2021/22
2.1 The 2021/22 IJB internal audit plan was approved by the PAC in September 2021 and
included a review of compliance with the CIPFA financial management code.  This
audit has been finalised and the findings are reported elsewhere on the agenda for
this meeting.  Substantial assurance was provided over the arrangements in place,
and no areas for improvement were identified during the review.
2.2 The opinion on the control environment of the IJB is also influenced by the audit
findings relating to the key systems of North Ayrshire Council and NHS Ayrshire and
Agenda Item 5
43

Page 44

Arran and by relevant audit work within service areas that are part of the Health and
Social Care Partnership.  The annual report on audit work within North Ayrshire
Council was presented to the Audit and Scrutiny Committee of the Council on 31 May
2022. The annual report for NHS Ayrshire and Arran was presented to the Audit and
Risk Committee of the NHS on 27 June 2022. 
2.3 Based on the audit work carried out in the IJB and relevant work carried out in the
parent bodies, my opinion is that reasonable assurance can continue to be placed on
the adequacy and effectiveness of the IJB’s systems of governance, risk and internal
control. 
Internal Audit Plan 2022/23 
2.4 The internal audit plan for 2022/23 was approved by the PAC on 24 June 2022.  The
IJB has its own audit plan which includes 25 days drawn from the Internal Audit
service of North Ayrshire Council and 10 days from NHS Ayrshire and Arran. 
2.6 Within the 25 days allocated by North Ayrshire Council, 10 days have been set aside
to fulfil the IJB Chief Internal Auditor role; this will include preparing reports for the IJB,
attending meetings and providing training and support to members of the IJB
Performance and Audit Committee. 
2.7 The remaining 15 days were left unallocated, for the approval of the PAC. It was
agreed that the 15 days will focus on the IJB’s arrangements towards community
engagement. 
3. Proposals 
3.1 It is proposed that the Committee notes the North Ayrshire Integration Joint Board
annual report for 2021/22 and the approved internal audit plan for 2022/23. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon
44

Page 45

4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the IJB’s strategic
priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 In preparing the draft IJB audit plan, consultation has taken place with the Director and
the Chief Finance and Transformation Officer of the North Ayrshire IJB and with the
internal auditors of the East and South Ayrshire Integration Joint Boards. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.   
45

Page 46

46

Page 47

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Strategic Risk Register 2022/23
Purpose: To inform the Committee of the Council’s agreed Strategic Risk
Register for 2022/23.
Recommendation: That Committee notes the Strategic Risk Register.
1. Executive Summary
1.1 The Strategic Risk Register has been reviewed and updated for 2022/23.
1.2 Six of the eight previous risks remain on the Strategic Risk Register at their existing risk
scores and titles – Financial Environment, Inequalities, Cyber Security, Transformation,
Climate Change and Community Capacity Building & Empowerment.
1.3 Financial Sustainability of the Health and Social Care Partnership has reduced in risk
score from 16 to 12 as a result of further positive corrective actions improving the
partnerships financial position.
1.4 A risk relating to the impact of Covid-19 was tabled at Cabinet in March 2020 as the
pandemic emerged. This risk has been renamed ‘Operating Environment’ and updated
to take account of the challenges of recovery and the uncertain operating environment.
1.5 The Strategic Risk Register was agreed by Cabinet on 7 June 2022.
1.6 It is noted that there are emerging risks associated with the creation of a National Care
Service and officers are currently working to incorporate this into the next update to the
Strategic Risk Register.
2. Background
2.1 North Ayrshire Council is committed to ensuring that it is proactive in identifying and
managing the risks impacting on the authority. The Council recognises that a certain
amount of risk is inevitable if the organisation is to achieve its objectives.
2.2 The aim of risk management is to reduce the likelihood and/or impact of risk by
identifying and controlling risks to the Council.  If risk is to be managed appropriately,
and Services are aware of these risks, risk management can contribute positively
Agenda Item 6
47

Page 48

towards the organisation's decision-making processes, making the Council more
innovative and effective in its approach to service delivery. 
2.3 The most significant risks are identified through the Council's Strategic Risk Register
(SRR), recognising the challenges facing the Council and demonstrating the
arrangements in place to manage these risks. 
2.4 The Strategic Risk Register has been reviewed and updated for 2022/23 and is
attached at Appendix 1 to this report.  For each of the risks detailed within the register
a number of components are identified: 
• Risk proximity factors.
• Risk score.
• Potential effect on the Council's priorities.
• Internal controls currently in place.
• Assessment of controls, and
• Additional actions identified. 
2.5 To assist in the assessment of each risk, the Council’s agreed risk matrix was used to
ensure consistency. This is used to assess the likelihood of occurrence (on a scale from
1 to 5) and the significance of the impact of the risk should it occur (on a scale from 1
to 5). The risk score is the product of likelihood multiplied by impact. Only those risks
rated as high or very high (10 or above) will feature on the SRR to ensure a focus on
managing the most significant risks. 
2.6 Six risks remain on the Strategic Risk Register at their existing risk scores – Financial
Environment, Inequalities, Cyber Security, Transformation, Climate Change and
Community Capacity Building and Empowerment. 
2.7 Financial Sustainability of the Health and Social Care Partnership has reduced risk
score from 16 to 12 which is a continuous line of improvement following a reduction
from 20 to 16 in 2021/22. 
2.8 A risk relating to the impact of Covid-19 was tabled at Cabinet in March 2020 as the
pandemic emerged and wording subsequently formulated. This risk has now been
renamed ‘Operating Environment’ and updated to consider the challenging emerging
risks. This considers a number of proximate and relevant risks such as recovery, living
with covid, Inflation impacts - cost of living and supply chain/construction inflation. 
2.9 Very High Risks  
• Financial Environment - this risk reflects the ongoing financial challenge faced
by the Council. (risk score 20)
• Inequalities - this highlights the socio-economic inequalities faced in North
Ayrshire. (risk score 20)
• Emergent Operating Environment – this risk reflects the challenges the
Council and its partners are facing as we move out of a covid control
environment requiring agile strategy. (risk score 20) 
High Risks 
48

Page 49

• Cyber Security – this reflects the ongoing risk from external cyber-attack which
is being faced by all organisations. (risk score 16)
• Transformation - this reflects the wider risks associated with delivering the
current Transformation Programme and developing a pipeline of future
initiatives. (risk score 16)
• Climate Change – this risk has been on the Strategic Risk Register following the
declaration by the Council of a Climate Change Emergency during 2019 (risk
score 16).
• Financial Sustainability of the Health and Social Care Partnership - this
reflects the ongoing financial challenges faced by the Partnership and the risk
these present to the Council. (risk score 12 – reduced from 16)
• Community Capacity Building and Empowerment - this highlights the
challenges associated with community empowerment (risk score 12). 
2.10 Council Services have identified high level strategic actions within their planning for
2022/23 to help the Council mitigate against its strategic risks. These actions are
detailed in summary format in the Risk Management Action Plans following each Risk
within Appendix 1.  These actions will assist with performance monitoring and reporting
on the strategic risks. 
2.11 The Council’s Internal Audit Plan 2022/23 was approved at the Audit and Scrutiny
Committee on 8 March 2022 and is risk-based with clear links in place between the
audit plan and key risks the Council faces. 
3. Proposals 
3.1 Committee is requested to note the Strategic Risk Register 2022/23. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Council continues to have a robust long- and medium-term financial planning
framework. Key strands include development of key transformation themes and the
establishment of an Investment Fund that will generate future savings alongside
delivery of a number of key Council priorities. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The risk to the Council is that North Ayrshire residents, and in particular certain
groups, will experience increasing levels of poverty and its effects. Current control
measures fall into two categories - measures to address the root causes of socio-
49

Page 50

economic inequalities - income through employment or benefits – and mitigation
measures to minimise the impacts of poverty. 
Climate Change and Carbon 
4.5 The Council has declared a climate change emergency and has in place an
Environmental Sustainability and Climate Change Strategy. Significant work to help
mitigate the risk of flooding is included within the Capital Plan. The Council is
undertaking an ambitious renewable energy programme. 
Key Priorities 
4.6 A successful risk management framework helps to underpin the delivery of the Council’s
strategic priorities in the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The Strategic Risk Register has been reviewed and updated in consultation with the
Executive Leadership Team and the Corporate Risk Management Group and approved
by Cabinet. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294-324524. 
Background Papers
None.
50

Page 51

Appendix 1 - Strategic Risk Report 2022/23
Risk Code SRR2223_R01 Risk Title Financial Environment Latest Note Date 20-Feb-2022 
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The risk is that the level of funding from
Scottish Government to local government
will require the Council to take increasingly
difficult and challenging decisions,
potentially operating with increased levels of
risk to ensure service delivery and
investment in assets align with available
resources. Although the 2022/23 local
government settlement represents an
increase of 0.90% in core grant funding, this
has to continue to be looked at within the
context of financial pressures facing the
council including pay, contractual and
demographic pressures over the short,
medium and long term and more recently
through the significant inflationary pressures
faced by the council. The continuation of
single year settlements makes effective
medium and long term financial planning
challenging. It is recommended that
following the settlement and within the wider
financial pressure context, the risk score
remains unchanged at this time. Any
consideration to change this will only occur
following a sustained period of annual
growth in core revenue funding.
The Council is exposed to financial risk as a
result of underlying cost pressures within the
IJB; more detail on this is set out at risk
SRR03.  
Funding not keeping pace with demand and
cost means that there will be a reduction in
some service areas potentially resulting in
higher risks for service users.  
Robust monitoring of the Council’s revenue and capital
budgets is in place as well as regular reporting of
financial performance of the IJB to Cabinet and Audit
and Scrutiny. 
To assist financial planning The Long Term Financial
Outlook (LTFO) to 2030/31 was approved at Council
on 16 December 2020 - this is the cornerstone of the
Council's financial planning in the medium to long
term. 
The Council approved a balanced budget for 2022/23
on  2 March 2022. Further funding of £3.209m was
announced by SG on 27 January 2022, taking the
settlement to a 0.90% increase from last year. A range
of additional finance pressures have been identified
including additional national insurance contributions,
energy cost inflation, contractual commitments as well
as significant construction inflation coming through the
capital programme. 
Based on the outturn position in 2021/22 for the IJB,
the annual debt repayment to the Council of £1.497m
will again be achieved and it anticipated the debt will
reduce from £3.807m to £2.310m at 31 March 2022.
This position is further supported by the creation of an
unearmarked reserve currently sitting at over £4m.
4 5
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 20 
51

Page 52

Strategic Risk Action Plan Date Updated 20-Feb-2022
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Regular financial monitoring of Revenue and
Capital Budgets  
20 February 2022: 
Bi-monthly monitoring  
31-Mar-2024 Mark Boyd 
Deliver balanced Budget for 2022/23
20 February 2022:
Budget delivered for 2022
02-Mar-2022 Mark Boyd 
Maintain Financial Governance
Arrangements for IJB  
20 February 2022:
Bi-monthly monitoring.  
31-Mar-2024 Mark Boyd 
Progress dialogue via COSLA with Scottish
Government on a range of areas including
fair funding, multi-year settlements,
reduction in levels of ring-fenced resources,
true costs of SG policy areas and financial
flexibilities
20 February 2022:
Regular engagement through Directors of finance group
31-Mar-2024 Mark Boyd 
52

Page 53

Risk Code SRR2223_R02 Risk Title Inequalities Latest Note Date 16-Feb-2022
Risk Owner Audrey Sutton/Caroline Amos
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
North Ayrshire residents, and in particular
certain excluded groups, will experience
increasing levels of poverty and its effects,
as a result both of the economic situation
and Covid-19. 
Health inequality is closely linked to poverty,
employment and people's earliest
experiences as children, and will increase. 
The population of North Ayrshire is
projected to fall over the next 10 years but
there will also be a larger proportion of the
population considered dependent (not
economically active).  
The impact on specific risk groups is
greatest for our children, young people and
families, unemployed people and those in
in-work poverty and people exposed to the
risks of drug and alcohol addiction. 
Demand for HSCP and Council Services
will increase. 
As reductions in resources increase, early
intervention and prevention activities are at
risk, thus increasing the potential for an
increase in costly crisis interventions. 
The local economy will be impacted by
reduced spending power by economically
inactive residents.  
Tackling inequalities is a strategic priority of the Community
Planning Partnership (CPP), the Council and the HSCP. 
Current poverty-related controls fall into two categories:
measures to address the root causes of socio-economic
inequalities – income through employment or benefits – and
mitigation measures to minimise the impacts of poverty. A
range of strategies are in place: Fair for All, Children’s
Services Plan, the Child Poverty Action Plan, Economic
Renewal Strategy, Community Wealth Building, the
Ayrshire Growth Deal. 
The HSCP tackles inequalities in areas of economy, health
and community. Through the HSCP strategic plan, the
Partnership sets out actions to tackle inequality through its
Partnership Pledge and across its strategic priorities. 
The Alcohol and Drug Partnership has a focus on drug and
alcohol misuse, with a focus on reducing the numbers of
drug related deaths. 
The ‘Housing First’ programme provides tenancies for the
most vulnerable homeless people in North Ayrshire, initially
targeting households with addiction and mental health
issues on discharge from prison. 
Through Covid-19 responses a whole system approach is
being developed to support residents through a place
based model of locality hubs and multi-agency locality
working. 
We continue to progress work to fulfil our commitment in
equality of opportunity in employment for all our employees.
The Council’s pioneering Community Wealth Building
Strategy focuses on five pillars to reduce inequalities and
work is well underway on procurement, land and assets
and fair employment.  
5 4
Status Risk Score
Heat Map 
Change in Score Approach
No Change Treat
Increasing 20 
53

Page 54

Strategic Risk Action Plan Date Updated 11-Feb-2022 
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Many of the current controls are in early to
medium stages of implementation: 
Fair for All (ongoing) 
Children’s Services Plan (new plan) 
Child Poverty Action Plan (new annual plan) 
HSCP Strategic Plan (new plan) 
Economic Renewal Strategy (new strategy) 
Community Wealth Building (in delivery) 
Ayrshire Growth Deal (launched and
underway)  
New Ayrshire Regional Economic Strategy
under development underpinned by a CWB
approach to create an inclusive economy
Recovery & Renewal Strategy 
11 February 2022:
Each of these strategies, taken together, and further developed and
implemented, should make a significant contribution to inequalities. 
Actions are being progressed and remain within the Target date for
completion.  
Commissioning commenced in Feb 22.
31-Mar-2024 Audrey Sutton/Caroline
Amos; Caroline Cameron 
54

Page 55

Risk Code SRR2223_R03 Risk Title Financial Sustainability of the Health and Social Care Partnership Latest Note Date 08-Feb-2022 
Risk Owner Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Uncertainty of future funding against
growing demand and demographic
pressures.
Resources have not kept pace with the
demand for and cost of social care services. 
There remains uncertainty around Covid-
related costs and how these ongoing costs
will be funded in the longer-term.
In earlier years, the HSCP did not manage
to contain spend within the delegated
budget, but surpluses were achieved in 20-
21 and 21-22. Outstanding debt to the
Council is currently £2.321m following
repayments 20/21 and 21/22. A further
repayment of £1.486m will be made at the
end of 22/23.
Current Scottish Government proposals to
introduce a National Care Service (NCS) by
2026 will significantly impact on the IJB. A
consultation on the NCS closed in
November 2021 and legislation will be
developed by Summer 2022.
Significant inflationary pressures across
employee pay and contractual costs will
increase the financial challenges for the
Partnership.
Funding levels could result in savings being
made that are not in alignment with the
strategic plan. This could impact on the
future demand levels e.g. reduction in early
intervention and prevention means that
future demand is increased. 
Funding levels increase the requirement to
transform services at scale and pace.
In 2020-21 and 2021-22, the Partnership
was in an underspend position.
The impact of the National Care Service will
become clearer as legislation is progressed.
The IJB actively monitors the financial position with
regular detailed reporting. Directors of Finance of the
Council and Health Board have oversight and regular
updates are provided to the Council's Cabinet.
There is an integrated approach to managing the
totality of NHS and Council resources delegated to the
IJB. The Medium-Term Financial Plan for 2022-25 has
been presented to the March 2022 IJB. Previous
financial settlements have seen both partners meet
the Scottish Government settlement conditions with
any additional resources passed to the IJB.
The IJB had uncommitted reserves of £4.151m (at
01/04/21) and this position is expected to improve at
the end of 21/22. It is anticipated that uncommitted
reserves will be towards the lower end of the good
practice target of 2%-4%.
Significant funding has been provided to IJBs for the
Covid-19 response, supported by regular financial
returns to the Scottish Government. Costs were fully
funded in 20/21 and 21/22 and funding was received
late in 21/22 which has been carried forward into
22/23 to support ongoing Covid-related costs.
The Scottish Government recently announced
additional funding for the areas below which support
the sustainability of the HSCP:
: Enhanced Care at Home capacity
: Interim Care
: Multi-Disciplinary Teams; and
: Mental Health Recovery and Renewal 
The Partnership has a Transformation Board
overseeing the programme of service re-design.
3 4
Status Risk Score
Heat Map 
Change in Score Approach
Reduced from 16 to 12 Tolerate
Reducing 12 
55

Page 56

Strategic Risk Action Plan Date Updated 08-Feb-2022 
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Budget Monitoring - Regular budget
monitoring reports to IJB are effective.  
8 February 2022:
No additional actions planned at this time but will keep under review
31-Mar-2024
Caroline Cameron;
Paul Doak 
Corrective Action – Transformation Board is
effective  
8 February 2022:
No additional actions planned at this time but will keep under review.
31-Mar-2024
Caroline Cameron;
Paul Doak 
56

Page 57

Risk Code SRR2223_R04 Risk Title Cyber Security Latest Note Date 03-Feb-2022 
Risk Owner Fiona Walker
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The potential compromise of business
operations or a data breach orchestrated via
either digital channels or the IT
infrastructure. This can include targeting of
the user base. Risk derives from both
Council operations and those of its supply
chain. 
The increasing importance of delivering
services through digital channels and
maximising efficiency through effective and
secure use of technology. This includes a
growing adoption of cloud-based computing
resources which extend processing
capabilities, and associated risks, beyond
the Council’s network. 
The ongoing response to the Covid-19
pandemic has resulted in the remote and
mobile working by staff as effectively being
the normal working practice. This is likely to
continue as a hybrid approach becomes the
new normal.  Such a distributed work force
increases the complexity of protecting
against cyber and data protection risks.  
Failure by Services to adopt and comply
with strategies, policies and procedures
may result in a failure to adequately ensure
the desired levels of cyber-security required
to maintain and protect council systems and
data. 
There may be a significant impact on the
authority through the release of personal
and/or sensitive information resulting in a
loss of public confidence and significant
financial loss incurred through fines and
service disruption. 
A successful cyber-attack (malicious
external or internal action) on the Council’s
IT environments could also result in
significant service disruption, loss of income
streams and possible data loss/exposure. 
Impacts of a cyber-attack could include
economic (i.e. inability to collect online
payments), societal disruption (i.e. loss of
diaries and client appointments), and
reputational damage (i.e. loss of public
confidence in digital services).  
It is recognised that it is not possible for any
organisation to expect to be completely protected
against continually evolving cyber threats. A threat
actor with sufficient motivation, resource and capability
will be able to compromise the most secure system. 
The Council takes a sociotechnical approach to
reducing risk by continually developing protective
measures through technical, organisational and
people-focused controls. 
Technical controls are implemented in areas such as
network defences, secure configuration of systems,
user authentication, malware protection, and
vulnerability management. These are based on best
practice and independently tested on an annual basis
to confirm their effectiveness in accordance with
compliance schemes. 
The Council maintains a comprehensive set of
policies, standards, guidelines, metrics and reporting
mechanisms as part of its information security
governance structure. A comprehensive training and
awareness programme is delivered to nurture a cyber-
aware workforce and culture.
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16  
57

Page 58

Strategic Risk Action Plan Date Updated 03-Feb-2022
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Incident Detection and Response – Recent
cyber-attacks on public sector organisations
highlight the need for robust incident
detection and response procedures and
technologies. The current response
procedures been shown to be effective
based on incidents experienced so far,
however detection capabilities will need to
be reviewed and improved.  
3 February 2022:
In progress – Documenting and embedding of specific response
procedures has still to be completed. Revised target date of 31st
December 2022 taking cognisance of ongoing recruitment process for
a replacement cyber security lead.
31-Dec-2022 Fiona Walker 
3 February 2022:
In progress – A joint procurement of a Managed Security Operations
Centre (SOC) service with other local authorities is being taken
forward by the Digital Office.  The intention is to have this agreed by
April 2022 and implemented by the end of 2022. 
31-Dec-2022 Fiona Walker 
3 February 2022:
In progress – The investigation of potential options and quotes is still
underway with Aon.  The risk assessment is complete and will now be
used in discussions to establish whether it is possible to broker for
quotes.  Revised target date of 31st December 2022 taking
cognisance of ongoing recruitment process for a replacement cyber
security lead.
31-Dec-2022 Fiona Walker 
Training and Awareness – The pandemic
has impacted on the cyber training
programme with the long-term cancellation
of all classroom-based training. However, a
new online course was launched to
compensate for this.  
3 February 2022:
In progress – Review of effectiveness still to be undertaken. Revised
target date of 31st December 2022 taking cognisance of ongoing
recruitment process for a replacement cyber security lead.
31-Dec-2022 Fiona Walker 
58

Page 59

Risk Code SRR2223_R05 Risk Title Transformation Latest Note Date 20-Feb-2022
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
There is an overarching risk that
transformation and change management
activities, which are core to the future
delivery models and long-term financial
sustainability of both the Council and Health
and Social Care Partnership, fail to deliver.  
Failure to deliver transformational change
will impact on the Council’s financial
sustainability, effectiveness of service
delivery and delivery of the outcomes set
out in the Council Plan 2019-24 and the
Local Outcome Improvement Plan (LOIP). 
Failure to deliver the HSCP Transformation
programmes across the Partnership,
involving North Ayrshire Council (NAC) and
NHS Ayrshire & Arran (NHSAA) services
may lead to the identified outcomes not
being delivered; resulting in financial
instability, reduced performance,
deteriorating patient outcomes, and
reputational damage within North Ayrshire
Health and Social Care Partnership
(NAHSCP). 
Failure to embed cultural transformation
activities may lead to difficulties in building
future workforce capacity and in ensuring
we have an engaged, skilled and
knowledgeable workforce to meet service
demand.  
The transformation programme aligns to the Council Plan and is
monitored via the Executive Leadership Team (ELT) and the
Transformation Board.
Workstreams have been developed across Transport and Travel,
Accessing our Council, Land and Property, Our Future Working
Environment and Sustainable energy. 
A Benefits Tracking monitoring tool is being developed to ensure
financial and wider outcomes, aligned to our Transformation plan, are
captured. 
HSCP have an established Transformation Board to closely monitor
progress with plans, regular updates on programme to the IJB and
regular meetings with the Chief Executive and S95 Officer to review
progress and mitigation plans. IJB will approve budget and Strategic
Plan for 2022-23 which will align financial plans with transformational
strategic change ambitions. 
Cultural transformation activities continue to evolve to support the
Council’s transformation and improve effectiveness and capability.
This includes sharing learning and skills, engagement, design
experiments and a whole systems approach to transformation and
change. 
Our workforce planning approach utilises a variety of tools and
techniques, such as career development, succession planning,
vacancy management, redeployment and early release schemes to
ensure our workforce requirements for the future, in terms of skills and
capabilities, are planned. Each Head of Service has a workforce plan,
and these are monitored six-monthly with continued HR support and
guidance to ensure service review and redesign of the workforce is on
track. 
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
59

Page 60

Strategic Risk Action Plan Date Updated 20-Feb-2022
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Existing project level governance and
controls remain effective and are constantly
reviewed. 
20 February 2022:
Transformation has recently moved to the Finance Service and
continues to progress existing plans as well as integrating into the
service and associated workstreams.   
Mark Boyd 
60

Page 61

Risk Code SRR2122_R06 Risk Title Climate Change Latest Note Date 22-Feb-2022
Risk Owner David Hammond
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Climate change is expected to continue and
worsen in the future if no action is taken,
with increases to mean global temperatures,
sea level rise and the increasing frequency
and severity of weather events such as
floods, heatwaves, droughts and storms. 
More frequent and intense heavy rainfall
events increase the risk of soil erosion and
flooding. 
Rises in mean sea level increases risks of
coastal erosion, flooding, saltwater intrusion
and soil salinisation (risk to agricultural land
and freshwater habitats). 
Severe weather is already affecting public
services across Scotland, with operational,
reputational, financial and legal
consequences. 
There is also an ongoing impact of severe
winter weather including snowfall and
freezing temperatures which impact service
delivery and the integrity of our roads open
space and buildings infrastructure. This shift
in weather patterns caused by climate
change is also affecting biodiversity across
Scotland.  
Increased frequency of severe weather
conditions and flooding events may lead to
more instances of damage to Council
infrastructure and property, interruptions to
service delivery and increased demands on
services, often with little notice. 
Risk to life, transport disruption and
pollution to the local environment, as well as
impact adversely on the local economy if
businesses are unable to operate. 
Council requirement to provide immediate
response and manage the adverse effects
of more frequent and severe weather
emergency situations, including support to
local communities and businesses. 
The Council is required to comply with the
‘Public Bodies Climate Change Duties’
under the Climate Change (Scotland) Act
2009. These duties require the Council to
assess the risks, threats and opportunities
associated with climate change and identify
actions to increase resilience to climate
change.  
North Ayrshire Council declared a Climate Emergency
in June 2019, committing to act on climate change and
reduce carbon emissions. In January 2020 the Council
approved the target to become net-zero carbon by
2030. 
The third iteration of the Environmental Sustainability
& Climate Change Strategy was approved by Cabinet
in May 2021, providing a road map to achieve the net
zero carbon emissions by 2030 target.  Climate
Change Adaptation has been included as a
workstream within the new strategy, utilising
Adaptation Scotland’s Capability Framework to ensure
North Ayrshire takes a strong, proactive approach to
adapting to climate change.  Officers are participating
in the Sustainable Scotland Network’s ‘Adaptation
Scotland Benchmarking Group’ to learn and share
best practice with other local authorities.
The Flood Risk Management Strategy has been
developed into a 6-year plan which began in 2016. A
second plan, which will follow on, is in development. 
In addition, actions to mitigate Climate Change risk are
held within strategies such as the Core Paths Plan,
Outdoor Access Strategy, Local Biodiversity Action
Plan, and Weather and Winter Emergencies Plan.
Asset management plans are in place which are
regularly reviewed for our Roads, Fleet, Housing,
Property and Open Spaces. 
Furthermore, through the Ayrshire Civil Contingencies
Team there are emergency planning arrangements in
place in the event of severe weather and flooding
conditions causing major disruption and damage to the
area or to individual communities within it. 
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16
61

Page 62

Strategic Risk Action Plan Date Updated 22-Feb-2022
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Reducing Carbon Emissions:
North Ayrshire Council declared a Climate
Emergency in June 2019, committing to act
on climate change and reduce carbon
emissions. In January 2020 the Council
approved the target to become net-zero
carbon by 2030. 
We have seen a reduction in overall carbon
emissions in the first half of 2021/2022 from
9,918tCO2 to 9,706 tCO2.
Existing controls remain effective and are
under review as our response to climate
change develops and we progress towards
achieving net zero by the 2030 target.  
22 February 2022:
Continuing the Implementation of the 3rd Environmental
Sustainability & Climate Change Strategy, which Includes a
Roadmap with actions towards achieving the target. The ESCCS 3
contains workstreams: 
• Affordable Warmth 
• Green Economy 
• Transport and Travel 
• Natural Environment 
• Sustainable Operations 
• Carbon Absorption 
• Climate Change Adaptation, which follows Adaptation Scotland’s
Capability Framework, to build a climate resilient North Ayrshire. 
Significant progress has been made in 2021/22 and this will be built
on in 2022/23.  Actions are being progressed and remain within the
Target date for completion.   
31-Mar-2023 David Hammond 
The Flood Risk Management Strategy: 
This has been developed into a multi-year
plan which began in 2016. The strategy
involves taking a proactive approach to flood
protection, using modelling to identify
vulnerable assets. Assets will then be
protected on a prioritised basis taking
financial damages and other impacts such
as danger to life and disruption into account. 
Existing controls remain effective and are
under review as our response to climate
change develops and we progress towards
achieving net zero by 2030 target.  
22 February 2022:
We will continue the implementation of the flood risk management
strategy and develop the next flood risk plans. Adaptation to the
impacts of climate change can be seen in the Flood Protection
Schemes being developed and delivered in the Upper Garnock
Valley and Millport. This is a continuous risk based and cyclical
process. 
31-02-2024 David Hammond 
62

Page 63

Risk Code SRR2122_R07 Risk Title Community Capacity Building and Empowerment Latest Note Date 20-Feb-2022
Risk Owner Rhona Arthur
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Unrealistic timescales for implementation of
aspects of legislation of the Community
Empowerment Act (Scotland) 2015, such as
Community Asset Transfer. 
Pressure to support community capacity
building and the variation of needs within a
reducing workforce. 
Duplication of effort across HSCP and
Locality Partnerships to foster community
participation and deliver engagement
activities.
Complying with the complex consultation
legislation in service redesign.  
Where the risk is not managed effectively
the potential benefits of community capacity
building and empowerment may be lost. 
Widening inequality gap between those
communities where levels of capacity and
engagement with the empowerment agenda
are high and those with less social capital
where interest remains low, which
constrains the ability to influence the
planning and delivery service. 
Any disconnect between the Council’s
aspirations, community appetite for
increasing ownership of assets and what
communities themselves feel able and
prepared to commit to can result in
community assets reverting back to Council. 
Accelerating asset transfer risks losing
services and facilities. 
Over-engagement carries disengagement
and engagement fatigue.  
Ongoing commitment to community empowerment
and locality partnerships from CPP. 
Six locality partnerships and alignment with HSCP
locality arrangements. 
Leadership of the CPP Senior Officers’ Group. 
Enabling approach with community partners and
support with third sector interface to build capacity and
identify opportunities for growth and sustainability. 
Reviewed guidance and processes relating to asset
transfer, allotment and Community Councils. 
Participatory budgeting approach local grants,
commitment to PB with partners and leading practice
in mainstreaming participatory approaches 
External funding bid help for groups through regular
meetings with third sector, funders and funding
officers. 
Membership of The Consultation Institute.  
Additional investment of £1m for a Community Asset
Transfer Start Up Fund, prioritising additional staffing
capacity to support CAT in Connected Communities
and TACT.  
3 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Tolerate
Stable 12 
63

Page 64

Strategic Risk Action Plan Date Updated 20-Feb-2022
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
Implementation of CEA: 
Existing controls remain effective and are
keep under review to monitor the impact of
Covid-19.  
22 February 2022:
Strategic CLD Plan 2021-2024 identifies priorities for capacity
building and the programme of community support is addressing
needs. New larders and Community Cafes are being supported by
the NA Food System. All other actions are being progressed and
remain within the Target date for completions.
31-Mar-2024 Rhona Arthur 
Implementation of CEA:
Existing controls remain effective and are
keep under review to monitor the impact of
Covid-19.  
20 February 2022:
Action ongoing to test current community priorities with recent
consultation on the Local Outcome Improvements Plan.
30-Mar-2022 Rhona Arthur 
Staff capacity: 
Existing controls remain effective and are
keep under review to monitor the impact of
Covid-19. 
20 February 2022:
Staffing capacity increased with CAT Start Up Fund June 2021.
31-Mar-2024 Rhona Arthur 
Alignment of engagement:
Existing controls remain effective and are
adapting to respond to the impact of Covid-
19.  
20 February 2022:
Actions are being progressed and remain within the Target date for
completion.
31-Mar-2024 Rhona Arthur 
Consultation: 
Existing controls remain effective and are
adapting to respond to the impact of Covid-
19.  
20 February 2022:
Actions are being progressed and remain within the Target date for
completion.
31-Mar-2024 Rhona Arthur 
64

Page 65

Risk Code SRR2223_R08 Risk Title Operating Environment Latest Note Date 24-Feb-2022 
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Residual societal impacts from ongoing
‘background’ waves of the pandemic and
new strains emerging. As the population
mixes again dormant infections such as
norovirus outbreaks will rise. 
There are ongoing and interrelated strategic
risks caused or exacerbated by the
pandemic ranging from increased
technology/cyber risk, financial (multiple
impacts), supply chain – particularly ICT and
specialist equipment, inequalities to how this
affects our transformation ambitions. 
The war in Ukraine is having indirect costs
and affecting market confidence. It is also
causing supply chain issues.  
A significant risk is inflation which is
affecting the cost of living and construction
projects.  Partly accelerated by factors
including Brexit and Covid, as well as
general inflationary pressures, there is a
significant risk of construction cost inflation
impacting on capital investment plans,
including the Ayrshire Growth Deal.
Other factors may increase constriction cost,
such as low carbon development solutions.
Concurrent’ resilience risks such as Cyber
Security and ‘Blackstart’ power resilience
risks add a layer of complexity. 
Delays to key plans, objectives and
projects. 
Consequences from this period including
financial loss, backlogs, socioeconomic,
health and mental health impacts on our
staff and communities. 
The disruption to proactive work in the
community has been detrimental to
inequalities, poverty, socio-economic and
health workstreams.  
The impact of construction cost inflation is
starting to materialise and project
development is requiring to adapt and often
descope to this.
Largely the issue will be a future issue that
will impact on construction projects that do
not have a completed build tender process
in place to restrict movement of material
price.
Strategic, tactical and operational response groups formed. 
Effective internal and external digital communication strategy in
place. 
Established but developing hub model North Ayrshire and
Anchor Community Partners. 
The ’North Ayrshire Food System’ has been developed to
ensure enhanced resilience. 
Ongoing interpretation of guidance, involvement with national
and local resilience partners and horizon scanning. 
Increased work on concurrent resilience risk planning. 
Refreshing the approach to Business Continuity Management. 
Redesigning project scope to reduce what can be delivered to
meet inflated costs
Identification of additional budget to support Business Continuity
measures
Negotiation with funders to seek either of the above, where
applicable.
Robust financial planning through the Medium term financial
Plan and 10 Year Capital programme to recognise impact of
inflation on budgets.
5 4
Status Risk Score
Heat Map 
Change in Score Approach
Revised risk Treat
Uncertain 20
65

Page 66

Strategic Risk Action Plan Date Updated 24-Feb-2022 
Analysis of Effectiveness of Controls Further Action Required Target Date for Completion Officers Responsible Current Status: RAG
There is ongoing work to develop business
continuity processes and ensure constant
horizon scanning for emerging risks. 
The Capital Programme Asset Group and
Ayrshire Growth Deal Governance board will
continue to assess this emerging
environment. 
24 February 22:
This risk will be monitored as the Council emerges from covid related
controls through the period of increasing inflation and update on
relevant actions at mid-year update.
- - 
66

Page 67

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit and Corporate Fraud Action Plans:
Quarter 1 update
Purpose: To advise the Audit and Scrutiny Committee on the progress
made by Council Services in implementing the agreed actions
from Internal Audit and Corporate Fraud reports as at 30 June
2022.
Recommendation: That the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions;
and (b) challenges those Services that have not implemented
actions within the previously agreed timescales.
1. Executive Summary
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in Scotland'
highlights that Audit Committees should monitor and review the progress made in
implementing audit recommendations.
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented.  This provides
assurance that identified control weaknesses have been addressed and are being
managed effectively.
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action.  This enables Internal
Audit to monitor progress on a 'real-time' basis and address any delays in
implementation.
1.4 This report details the position at 30 June 2022.
2. Background
2.1 The last report to the Audit and Scrutiny Committee on 31 May 2022 highlighted that
there were 18 actions outstanding at the end of March 2022: five that had not been
started or were only partially implemented and 13 where the due date had not yet
passed.
Agenda Item 7
67

Page 68

2.2 In addition to these 18 carried forward actions, there have been 22 new actions
agreed, giving a total of 40 action points for review. 
2.3 Services have completed 12 actions since the last report.  All Council Services are
required to retain evidence of work carried out in completing their actions and Internal
Audit carries out 'spot-checks' on a sample of completed actions on an ongoing basis. 
2.4 Of the remaining 28 actions, nine were either not started or only partially complete at
30 June 2022 and the remaining 19 were not due for completion until after that date. 
2.5 Appendix 1 to this report provides the Committee with full details of seven of the
actions that were not complete within the agreed timescales. In terms of Section 50
(A) 4 of the Local Government (Scotland) Act 1973, two of the outstanding action
points are exempted from public inspection, on the grounds indicated in terms of
Paragraph 1 of Part 1 of Schedule 7A of the Act. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and (b) challenges
those Services that have not implemented actions within the previously agreed
timescales. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud actions
helps to support the efficient delivery of the strategic priorities within the Council Plan
2019-2024.
68

Page 69

Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
69

Page 70

Actions due by 30th June but not started or partially complete 
Code IA2017PA020b Description Data protection information awareness for schools training should be agreed and
implemented as soon as possible.
Priority 1 Latest Note A data protection talk for Garnock Academy has been arranged for 22nd November
so the action will be complete then, as all other schools have completed this training.
Progress Bar  Original Due Date 01-Jun-2018 Due Date 30-Apr-2022
Parent Code & Title IA2017PA020 Email Controls In Education
Managed By Andrew McClelland
Assigned To Rosslyn Lee 
Code IA2021PA009a Description
Audit Action: The admin team should ensure that all areas of this process are
documented in standard operating procedures and issued to all relevant members of
the team.
Audit Finding: The admin team are currently working on standard operating
procedures to cover the full process for Council tenants and those completed during
the audit were provided to the auditor for review.
Risk: Inconsistent approach by staff, possible key tasks not being carried out and
lack of business continuity if staff familiar with the process are not available.
Priority 2 Latest Note
The team are continually working with the Transformation team to streamline our
processes and use systems to produce reports for information rather than
spreadsheets.  Our standing operating procedures will continually be updated to
reflect any changes that are made.  Proposed new end date 30th September 2022.
Progress Bar  Original Due Date 31-Dec-2021 Due Date 30-Jun-2022
Parent Code & Title IA2021PA009 Aids and Adaptations Managed By David Thomson
70

Page 71

Assigned To Lynn Kirkland
Code IA2021PA009b Description
Audit Action: The team should liaise with the Transformation team to streamline this
part of the process and reduce the number of times the same information must be
keyed.
Audit Finding: The admin team are required to update the budget monitoring
spreadsheet, an operational access database and the CareFirst system at each stage
of this process for all council tenant jobs. In addition, the access database is not
supported by IT Services.
Risk: Inefficient use of staff time and increased risk of keying errors.
Priority 2 Latest Note
This is currently ongoing with the Transformation team and also with the work that is
being done at the moment with the new Eclipse system we are hoping that when
developing the system for Comm OT and adaptations that we will be capture the data
on this system to produce scheduled Business Object Reports.  This will be ongoing
with the transformation team until the end of the year.
Progress Bar  Original Due Date 31-Dec-2021 Due Date 06-Jun-2022
Parent Code & Title IA2021PA009 Aids and Adaptations
Managed By David Thomson
Assigned To Lynn Kirkland 
71

Page 72

Code IA2021PA013b Description
Audit Action Building Services should progress with the interface between the URM
system and Integra to prevent double keying.
Audit Finding There has been no progress made in an invoice interface between the
URM system and Integra. As a result, Building Services staff are having to double key
invoices.
Risk Increased risk of keying errors and inefficient use of staff time.
Priority 3 Latest Note
In order to implement the Creditors interface some work had to be undertaken on the
general ledger.   This work was complete in December 2021 and involved a mapping
exercise to ensure ROCC’s financial coding was in line with the Councils Integra
system, this involved removing the translation table that changed the old financial
codes to the current codes that are in use.
Following this there was some discussions re the best route to take to remove any
duplicate keying and the options reviewed were a creditors interface, e-invoicing or
both.  It has been decided that introducing the creditors interface would be the
preferred option initially.  IT suppliers have been contacted and a cross service
working group has been set up to progress this action, with supplier forms received
and a mapping exercise across systems to match suppliers due to commence.
The new date for this action is January 2023 and is reliant on external suppliers
meeting our deadlines.
Progress Bar  Original Due Date 31-Dec-2021 Due Date 31-Dec-2021
Parent Code & Title IA2021PA013 Building Services Systems
Managed By Yvonne Baulk
Assigned To Leigh-Ann Mitchell; Jim
Smith 
72

Page 73

Code IA2022PA019b Description
Audit Action: A minimum technical standard for CCTV systems should be set for the
Council. A Council-wide audit of CCTV inventory should be carried out to assess
compliance of CCTV assets against the standards, which will give an indication of the
level of capital investment required to bring the Council’s CCTV systems up to an
appropriate standard and form the basis of a bid for capital. 
An approval process should be introduced to ensure new CCTV purchases meet the
requirements of the standards.
Audit Finding: Audit were advised that there are various capital budgets in place
covering vehicles and property lifecycle investment. However, there is no formal
replacement programme for CCTV equipment. 
Risk: Substandard systems that aren’t fit for the intended purpose. CCTV footage is
not available or not usable when required.  
Priority 2 Latest Note
The CCTV Asset Register is in the process of finalisation and all CCTV assets have
been identified. A process is being undertaken to review these assets including
undertaking Data Protection Impact Assessments.  These will come for review and
services have been advised to get those to the Information Governance team by 31st
August.  This will help to inform whether the CCTV asset is still required, its age and
condition and whether it meets acceptable technical standards. If the asset is no
longer required, it will be decommissioned in accordance with identified processes.  If
upgrading is required, a process has been embedded into the corporate CCTV policy
for agreeing upgrades.  The anticipated completion date is 31st December 2022.
Progress Bar  Original Due Date 30-Jun-2022 Due Date 30-Jun-2022
Parent Code & Title IA2022PA019 CCTV in Council Buildings and Vehicles
Managed By Aileen Craig
Assigned To Lorraine Barr; Mark Boyd;
Russell McCutcheon
73

Page 74

Code IA2022PA027a(1) Description
Audit Action: Written procedures on the calculation of PIs should be produced.
Audit Finding: There are no written procedures detailing the methodology for
the calculation of PI CP_12.
Risk: Inaccurate and/or inconsistent PI figures being published due to errors in
calculations; business continuity implications
Priority 1 Latest Note
We have identified an alternative means of collecting information to support this
PI which would be relevant to service activity and meet requirements as regards
accuracy/consistency of reporting.  There is still some work to be done to confirm
this as the best route forward, and create relevant written procedures to support
it, which we hope to have complete by end of September 2022.
Progress Bar  Original Due Date 30-Jun-2022 Due Date 30-Jun-2022
Parent Code & Title IA2022PA027 Performance Indicators
Managed By Thelma Bowers
Assigned To Dominic Jarrett 
74

Page 75

Code IA2022PA027b Description
Audit Action: HSCP to identify more useful PIs to be considered for inclusion in
the upcoming Council Plan update.
Audit Finding: The current PI [PI CP_12] might not provide the most useful
information to the public and Council Officers.
Risk: The public and managers are missing out on more useful information due
to the current PIs.
Priority 2 Latest Note
The Learning Disability Service has been exploring a range of possible indicators
as part of its ongoing development of Trindlemoss and other aspects of the
service, as well as considering other developments due to come on-stream later
this year (primarily the establishment of a new Intensive Support Team).  Our
consideration of Performance Indicators is being informed by our ongoing
involvement in a learning collaborative with Healthcare Improvement Scotland;
we have also linked with Healthcare Improvement Scotland around their
promotion of Human Learning Systems, and the new perspectives on measuring
outcomes/performance which this encourages.  We hope to have established a
relevant range of indicators by end October 2022.
Progress Bar  Original Due Date 30-Jun-2022 Due Date 30-Jun-2022
Parent Code & Title IA2022PA027 Performance Indicators
Managed By Thelma Bowers
Assigned To Dominic Jarrett 
75

Page 76

76

Page 77

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit Plan 2022/23: Mid-year Update
Purpose: To provide an update on progress made in delivering the
2022/23 Internal Audit Plan.
Recommendation: That the Committee (a) notes the current position, (b) approves
the inclusion of two additional audit reviews in 2022/23, and (c)
approves the deferral of five audits for consideration as part of
the 2023/24 internal audit plan.
1. Executive Summary
1.1 The current Internal Audit Plan, covering the period April 2022 to March 2023, was
approved by the Audit and Scrutiny Committee in March 2022. The plan sets out the
areas of work which Internal Audit intends to cover during the year.
1.2 The Public Sector Internal Audit Standards recognise that it is good practice to
regularly review and adjust the plan, as necessary, in response to changes in the
organisation’s business, risks, operations, programmes, systems and controls.
1.3 Some amendments are proposed to the internal audit plan for 2022/23 and these are
detailed within this report and Appendix 1.
2. Background
2.1 Appendix 1 to this report is the approved audit plan for 2022/2023. For each audit,
additional information has been provided to show the actual activity to 30 June 2022
and for competed audits, dates when the final report was published and reported to
the Audit and Scrutiny Committee.
2.2 Twelve reports have been published in 2022/2023 to date; 11 of these were from the
2021/22 plan and one completed from the current year plan.
2.3 In line with good practice, the plan should be reviewed during the year in light of
experience gained from audit work carried out, emerging risks to the Council and the
changing environment in which audit work is carried out.
2.4 In May 2022, CIPFA published their “internal audit: untapped potential” report
highlighting the vital role that internal audit has to play in supporting public sector
Agenda Item 8
77

Page 78

organisations to achieve their goals.  The revisions to this audit plan, and the planning
for 2023/24, will take into account this publication and its recommendations for
coverage in the coming years, while also balancing this with the specific risks
emerging for the Council. 
2.5 A significant priority in the coming three years will be an increased audit coverage of
cyber security arrangements. There is technical knowledge required to meet this need
and the Council is fortunate to have that expertise in-house through a dedicated
Computer Auditor. 
2.6 With Committee approval, the following additional audits are proposed for inclusion in
the 2022/23 plan: 
• ICT supplier management, with focus on the Scottish Government’s cyber
resilience framework.  Two existing ICT audits will remain in the audit plan as
originally planned but will also focus on the cyber resilience framework for the
scope of work – ICT assets and ICT network controls.
• ASN provision – during the consultation process for the mid-year review, the
service highlighted a risk around their budget monitoring arrangements for ASN
provision which are highly complex and internal audit could add value by
reviewing current processes and identifying potential areas for improvement. 
2.7 With Committee approval, and in order to align audit days with available resources,
the following audits will be deferred for consideration as part of the 2023/24 plan: 
• Transformation – due to the timing of the Recovery & Renewal Team disbanding
and responsibilities transferring to Finance and Place, it is considered reasonable to
allow for arrangements to be developed and working groups sufficiently established
prior to an audit review commencing.  Given the recent best value review carried out
by external audit, this is considered to be a low risk decision.
• Risk management – as above, due to the timing of the Recovery & Renewal Team
disbanding and responsibility for risk management transferring to Finance, it is
considered reasonable to allow time for all risk management processes to be
brought up to date prior to an audit review.
• Social care clients financial assessments – a recent audit assignment on care
home admissions (which is currently at draft report stage) included a review of
residential financial assessments and therefore there is no requirement to
duplicate this work.
• Locality Planning/CPP – the service is currently working on a number of areas
within this category and audit work at this time may not be helpful. Further work will
be required to map out risks and auditable areas to identify where internal audit
can add the most value.
• Residential Placements – while a previous audit review in this area identified some
areas with limited assurance, it is acknowledged that this area was last reviewed in
2019/20 and due to resource constraints can be deferred while still being covered
again in a reasonable timeframe. 
2.8 Due to limited resource and capacity within the team to accommodate any additional
reviews, further amendments will need to be considered within the context of available
resources. 
78

Page 79

3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position, (b) approves the
inclusion of two additional audit reviews in 2022/23, and (b) approves the deferral of
five audits for consideration as part of the 2023/24 internal audit plan. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. Services have also been consulted on the proposed changes to the
internal audit plan. 
Mark Boyd
Head of Service (Finance) 
79

Page 80

For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
80

Page 81

NORTH AYRSHIRE COUNCIL
INTERNAL AUDIT PLAN 2022-23
PROGRESS REPORT at Quarter 1
PRODUCTIVE TIME - AUDIT PLAN
Key Corporate Systems Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Final Report
issued
Report to
Audit and
Scrutiny
Income collection
Carry out a review of the controls within the new Civica Pay income
collection system. 20 0 20 20 Scheduled Q4
Employee Services - HR/Payroll system
and processes Review a range of controls relating to the CHRIS21 payroll system. 30 0 30 30 Scheduled Q3
TOTAL AUDIT DAYS 50 0 50 50
Other Systems Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Final Report
issued
Report to
Audit and
Scrutiny
Museums and Heritage
Review the effectiveness of a range of controls within the Museums and
Heritage service. 15 0 15 15 Scheduled Q3
Early years provision Review the service arrangements for payments to private nurseries 15 0 15 15 Scheduled Q3
Glow
Review the Council's compliance with Education Scotland Guidance on the
use of Glow 15 0 15 15 Scheduled Q4
ASN provision
Review the budget monitoring arrangements in place for managing the ASN
provision 0 0 0 15
Proposed adding to the
plan and schedule Q4
Agency staff and workers Examine the Council's use of agency staff and workers. 15 17 -2 17 Complete 02/08/2022 13/09/2022
Transformation
Review the Council's approach to transformation and its progress with best
value 20 0 20 0
Propose to defer for
consideration in 23/24
Residential placements
(HSCP/Education)
Review the use of placements within other authorities, residential schools or
private educational establishments. 15 0 15 0
Propose to defer for
consideration in 23/24
Social Services Clients - financial
assessments
Consider the financial assessment process carried out for Health and Social
Care Partnership clients by the Finance team. 15 0 15 0
Propose to defer for
consideration in 24/25
Integration Joint Board audit days
Carry out audit work as agreed by the Performance and Audit Committee of
the Integration Joint Board. 15 0 15 15 Scheduled Q4
Roads - stores control Examine the controls within the Roads materials store. 15 0 15 15 Scheduled Q2
Transport - Journeys and Hires
Review controls in the Transport Hub in relation to transportation, with a
particular focus on the use of taxis. 15 4 11 15 Work in progress
Building Services - procurement (inc.
sub-conts and materials) Review controls around procurement within Building Services. 15 8 7 15 Work in progress
Facilities Management - Procurement Review controls around procurement within Facilities Management. 15 0 15 15 Scheduled Q2
Scottish Housing Regulator
Review the governance arrangements around the Annual Assurance
Statement 15 1 14 15 Scheduled Q2
PMI - commercial and industrial rents
Review the governance arrangements and processes around commercial
and industrial property rentals. 20 0 20 20 Scheduled Q2
TOTAL AUDIT DAYS 220 30 190 187
81

Page 82

ICT Auditing Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Final Report
issued
Report to
Audit and
Scrutiny
ICT network controls Review a range of controls within the corporate network 20 3 17 20 Work in progress
ICT assets Review controls over a range of ICT assets. 20 0 20 20 Scheduled Q3
ICT supplier management Review controls over ICT supplier management 0 0 0 20
Proposed adding to the
plan and schedule Q4
TOTAL AUDIT DAYS 40 3 37 60
Governance Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Final Report
issued
Report to
Audit and
Scrutiny
Risk management Review the Council's approach to risk management and risk control 15 0 15 0
Propose to defer for
consideration in 23/24
HR - Workforce Planning (inc. VER/VR
schemes) Review the Council's workforce planning arrangements. 15 0 15 15 Scheduled Q4
Gifts and hospitality
Examine compliance with the Council's guidance on Gifts and Hospitality
within the Employee Code of Conduct. 10 0 10 10 Work in progress
Locality Planning/CPP Review the Council's approach to locality planning 15 0 15 0
Propose to defer for
consideration in 23/24
TOTAL AUDIT DAYS 55 0 55 25
Regularity Audits Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Final Report
issued
Report to
Audit and
Scrutiny
Accounts Payable transaction testing
Use data analysis software to interrogate the HR/Payroll system and
examine any anomolies which arise. 15 1 14 15 Work in progress
Payroll transaction testing
Use data analysis software to interrogate the Accounts Payable system and
examine any anomolies which arise. 15 5 10 15 Work in progress
Primary Schools (incl ASN School)
Review financial controls within the Council's primary and ASN schools
using self-assessment audit questionnaires and investigate any concerns
which arise. 30 0 30 30 Scheduled Q3
Social Care establishments
Review financial and other controls within a range of operational
establishments managed by the Health and Social Care Partnership. 20 0 20 20 Scheduled Q2
TOTAL AUDIT DAYS 80 6 74 80
Following the Public Pound Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Community Councils
Annual audit of Community Councils accounts' to ensure Council funding is
used in accordance with the Council's Scheme of Administration. 10 4 6 10 As required.
Tenants and Residents Associations
Annual audit of the accounts of various Tenants and Residents
Associations. 2 0 2 2 As required.
TOTAL AUDIT DAYS 12 4 8 12
82

Page 83

Other Work Audit Objective
Planned
Audit Days
Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Prior year audit work
Completing audits from the previous year's audit plan that were not fully
complete by the end of March 2017 or starting audits early from the 2018/19
audit plan. 20 62 -42 62 As required.
Audit consultancy: ad-hoc advice Providing advice to council services in response to ad-hoc queries 10 3 7 10 As required.
Audit consultancy: project work
Participating in project work to support developments in other council
services. 25 3 22 25 As required.
Follow-up
Follow up of previous audit reports to ensure that appropriate action has
been taken. 15 3 12 18 As required.
Audit planning and monitoring
Preparing audit plans and monitoring progress and performance against
plans. 20 7 13 20 As required.
Audit and Scrutiny Committee
Supporting the Council's Audit and Scrutiny Committee by preparing reports,
attending meetings and delivering training for elected members as required. 25 10 15 25 As required.
Governance documents Review of governance documents 2 1 1 2 As required.
Development of the Audit service
Carry out developmental work to further enhance the efficiency of the audit
section. 5 0 5 5 As required.
Internal Audit self-assessment against
PSIAS
Undertake a quality assurance programme for Internal Audit in line with the
requirements of the Public Sector Internal Audit Standards (PSIAS). 2 0 2 0 As required.
Internal Audit EQA (assess or being
assessed)
Participate in the Scottish Local Authorities Chief Internal Auditors Group
(SLACIAG) review network for the external quality assessment programme. 10 0 10 10 As required.
Grant claims
Certification of expenditure funded by specific grants from external funding
bodies 2 0 2 2 As required.
Annual Accounts
Work in relation to the Council's annual accounts, including stock counts,
reviewing imprests and preparing the Annual Governance Statement. 2 1 1 2 As required.
TOTAL AUDIT DAYS 138 90 48 181
TOTAL PRODUCTIVE TIME - AUDIT PLAN 595 133 462 595
PRODUCTIVE TIME - CONTINGENCIES AND INVESTIGATIONS
Contingencies & Investigations Audit Objective Days Actual Days
@ 30/06/22
Variance
Fav / (Adv)
Proposed
revised plan
Current Progress @
30/06/22
Non-Fraud Investigations 20 10 10 20 As required.
TOTAL AUDIT PLAN 2022-23 615 143 472 615
83

Page 84

84

Page 85

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit Reports issued
Purpose: To inform the Committee of the findings of Internal Audit work
completed between May and August 2022.
Recommendation: That the Committee considers the outcomes from the Internal
Audit work completed.
1. Executive Summary
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed.
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit.
2. Background
2.1 This report provides information on Internal Audit work completed between March and
April 2022.  Internal control reviews have been completed in respect of the areas
detailed in Appendix 1 to this report. The aim of these reviews is to provide assurance
that the internal control framework within the areas examined is appropriate and
operating effectively.
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit.
2.3 The findings from eight separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below:
Agenda Item 9
85

Page 86

Audit Title Assurance Level
IJB Compliance with the CIPFA Financial Management
Code
Substantial
Accounts Payable Transaction Testing Q4 Reasonable
Leavers & Movers Processes Reasonable
Social Media Substantial
VAT Reasonable
Off-Payroll Working (IR35) Substantial/Limited
CM2000 Substantial
Funding Support to Businesses Reasonable 
2.4 The key findings are as follows: 
• In respect of off-payroll working (IR35), substantial assurance was obtained around
the Employee Services’ provision of procedures and guidance to Council Services. 
Information and support is available to Services and reliance is placed on Services
making use of these resources.  Limited assurance was obtained with regard to the
application of IR35 within Services.  It is noted that Building Services were able to
demonstrate some consideration and application of IR35 in 2021/22. 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between May and August 2022. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
86

Page 87

4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
87

Page 88

IJB COMPLIANCE WITH CIPFA FINANCIAL MANAGEMENT CODE 
1 Background  
1.1 The CIPFA Financial Management Code (the FM Code) was published in October
2019.  It applies to IJBs in Scotland as well as Local Government Bodies in
Scotland, England, Wales and Northern Ireland.  The purpose of the FM Code is to
“support good practice in financial management and to assist local authorities
[including IJBs] in demonstrating their financial sustainability.”  The FM Code
consists of 17 standards presented across 7 thematic sections.  
1.2 Lasts year’s IJB audit related to Governance and is taken to largely cover sections
2 (Governance and Financial Management Style) and 5 (Stakeholder Engagement
and Business Cases) of the Code.  It is expected that the work of the IJB’s External
Auditor will cover section 7 (External Financial Reporting) of the Code.  The IJB
does not have a capital programme, so Standard H is not relevant to the
organisation.  
1.3 The FM Code states that the “Leadership Team includes Executive
Committees…and other Key Committees of the Authority and Senior Officers”,
therefore in applying it to North Ayrshire IJB, it is taken to mean the IJB and senior
officers. 
2 Objectives and Scope  
2.1 The audit tested the IJB’s compliance with the following sections of the FM Code:
• Section 1 The Responsibilities of the Chief Finance Officer and Leadership
Team
• Section 3 Medium to Long-Term Financial Management (excluding Standard H)
• Section 4 The Annual Budget
• Section 6 Performance Monitoring  
2.2 The main objectives of the audit were to ensure that:
• the Chief Finance Officer and Leadership Team are fulfilling their Financial
Management responsibilities.
• the IJB has adequate arrangements in place to plan its finances in the medium
to long term.
• the IJB has adequate arrangements in place to set a sustainable and robust
annual budget.
• the IJB has adequate arrangements in place to monitor its financial
performance. 
3 Findings   
Responsibilities of the Chief Finance Officer and Leadership Team  
3.1 The IJB ensures it is obtaining value for money through its budget setting and
budget monitoring processes.  North Ayrshire Council and NHS Ayrshire and Arran
both have procurement strategies to ensure that they are obtaining value for
money.  The IJB also receives assurance on value for money from the work of
internal and external audit.
88

Page 89

3.2 The Chief Finance Officer was found to comply with the CIPFA Statement on the
Role of the Chief Financial Officer in Local Government.  This statement covers:
• role in the Leadership Team
• involvement in business decisions
• promotion of good financial management
• finance function
• qualifications and experience   
Medium to Long-Term Financial Management  
3.3 The Annual Budget 2022-23 and Medium Term Financial Outlook 2022-25 (MTFO)
were approved by the IJB in March 2022.  They consider financial risks to the IJB
and the MTFO considers a variety of funding and cost pressures and risks, with
different possible scenarios and sensitivity analysis.    
3.4 The Budget and MTFO consider the IJB’s prospects for financial sustainability and
although they focus on the next 3 years, they consider factors affecting the IJB’s
financial position further into the future, such as government proposals covering
the term of the Scottish Parliament and demographic changes.  
3.5 The MTFO constitutes a rolling multi-year medium-term financial plan.  The Budget
gives more detail for the 1st year of this 3-year period, where funding is known with
more certainty. The MTFO links into the IJB’s 10-year Strategy to ensure that the
resources are targeted towards strategic priorities.   
The Annual Budget  
3.6 The IJB’s Integration Scheme is approved by Scottish Ministers and lays out how
the IJB will set an annual budget for the resources provided by the partner
organisations.  The IJB has set a balanced budget for 2022-23 to fulfil this
requirement.      
3.7 In the Budget papers, the Chief Finance Officer states that “The estimates are
based on a robust understanding of the additional resources available, the risks
and challenges faced by the Partnership and the anticipated budget pressures.” 
The resources, risks, challenges and budget pressures are described in more detail
throughout the report.  
3.8 With regard to the adequacy of reserves, the paper states that the optimum value
of reserves held uncommitted in contingency is 2-4% of net expenditure, and that
the estimated value is 2.2%, therefore at the lower end of the target.  Furthermore,
one of the anticipated outcomes of the budget is listed as “The level of free general
fund reserves and earmarked resources for service investment provides
confidence re the financial sustainability of the IJB.”   
Monitoring Financial Performance  
3.9 The IJB receives regular budget monitoring reports which highlight key risks and
actions being taken to monitor and mitigate them.  The Strategic Risk Register
identifies Financial Sustainability as a strategic risk for the IJB, and several other
strategic risks which have the potential to impact the IJB’s budget strategy and
89

Page 90

financial sustainability.  The most recent review of the Strategic Risk Register was
approved by the IJB in March and identifies existing and new mitigating actions for
these risks. The Strategic Risk Register is reviewed annually as a minimum.  
3.10 As at the Annual Accounts 2020/21, the only balance sheet items for the IJB were
short term debtors, long term creditors and Usable Reserve: General Fund.  The
debtor balances represent the value of reserves held by partners supporting the
earmarked element of the General Fund balance.  The creditor relates to an
outstanding debt to North Ayrshire Council which the IJB has been paying back in
stages over a number of years.  The budget monitoring reports include
consideration of the position in relation to reserves, including the debt to North
Ayrshire Council. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the IJB’s compliance
with the CIPFA Financial Management Code. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
90

Page 91

ACCOUNTS PAYABLE TRANSACTION TESTING Q4 
1 Background  
1.1 This audit used computer audit software called IDEA (Interactive Data Extraction
and Analysis) to interrogate the Accounts Payable (AP) System and examined any
anomalies which arose.  
1.2 There were 45,241 invoices paid to trade and sundry suppliers during the period of
the audit totalling just under £160 million.  
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• duplicate invoices have not gone undetected.
• invoices paid to employees are bona fide.  
2.2 The audit period was 1st July 2021 to 31st December 2021. 
3 Findings   
Invoice Tests  
3.1 The auditor tested for duplicate invoices for payments to suppliers and identified
176 possible duplicates that were investigated further.  This confirmed that 79 were
duplicates but had already been identified and action taken by the AP team.  This
testing eventually identified 13 potential duplicate invoices totalling £9,441.24, and
2 potential credit notes totalling £943.98 which have not already been identified by
the AP team.  The potential duplicates have been passed to the AP team to check
and arrange recovery.  (action a)   
Payments Made to Employees Tests  
3.2 The auditor tested for employees who have been paid via Integra.  This highlighted
44 supplier bank details matching an employee’s bank details which received
payments via Integra.  All invoices to these suppliers were checked and the majority
were in relation to kinship/fostering/ adoption payments.  There were 3 purchases
with a value between £4,000 and £7,000 that were investigated further, and
assurance was obtained that proper procurement processes were followed.  
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the controls around the
processing of invoices, in particular to preventing duplicate invoices being
processed as the number of potential duplicates identified is relatively low.   
91

Page 92

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
92

Page 93

KEY FINDINGS AND ACTION PLAN
ACCOUNTS PAYABLE TRANSACTION TESTING Q4 
Action a
Finding Testing identified 13 potential duplicate invoices totalling
£9,441.24 and 2 potential credit notes totalling £943.98, which
have not already been identified by the AP team.  
Action Description AP should review the potential duplicate invoices and, where
necessary, arrange for recovery of monies paid twice.
Risk The Council has paid the same invoice twice and the money
has not been recovered. 
Priority (1, 2, 3) 1
Paragraph Reference  3.1
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Quinn, Senior Manager (Corporate Procurement)
Due Date 31/05/22
Management Comment The Accounts Payable Team will investigate the 13 potential
duplicate invoices by 31/05/22 and recover where appropriate
or 
notify Internal Audit, why duplicate payment is legitimate. 
Recovery of funds can take several months. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
93

Page 94

LEAVERS AND MOVERS PROCESSES 
1 Background  
1.1 The audit reviewed the controls around employees who move jobs within the
Council as well as employees who leave the Council, with a particular focus on
access to personal and sensitive information.  The audit focused on the IT process
but it incorporated the HR process to ensure the process is clear for managers. 
The scope of the audit covered the controls in relation to the Corporate network
only.  The Education network was not included.    
1.2 A movers process audit report was issued in January 2019 and this audit
incorporated a follow-up of the actions identified in this audit.  A leavers process
audit was issued in March 2017.  
1.3 As a result of the previous movers audit, IT Services introduced an Active Directory
(AD) Chris movers process which involved a script being developed which links to
the Payroll system and removes all bar default network groups on the employee’s
moving day.  The new line manager will have to request the correct network access
via the IT Portal.  This is to ensure the previous job’s network access is not retained
if the new line manager does not request new access in advance of the move.  If
the manager does request new access, IT Services developed an app which logs
all such requests.  This ensures any changes requested via the IT portal and
actioned by IT are not removed when the IT script runs otherwise the new access
will be wiped and access returned to default network groups only.    
1.4 IT Services also introduced a monthly leavers and movers report which is
generated from the Payroll system and emailed to key system administrators to
take action to remove access to IT systems.  
1.5 The Council uses Office 365 which includes access to Teams sites and SharePoint
sites.  There is an ongoing project to move network files/folders to SharePoint sites.  
1.6 The auditor was advised during the audit that IT Services are replacing the current
IT Portal for logging jobs with IT.      
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• Appropriate procedures are in place to advise managers of their responsibilities
for employees leaving the Council or moving posts.
• Network access has been deactivated or amended in a timely manner for
employees who have left the Council or moved jobs within the Council.
• System access has been deactivated or amended in a timely manner for
employees who have left the Council or moved jobs within the Council.
• Processes are in place to remove or amend access to SharePoint and Team
sites for employees who have left the Council or moved jobs within the Council.
• Leavers and movers processes are operating as expected and access has been
deactivated or amended correctly.  
94

Page 95

3 Findings   
Leavers Process for Network Access  
3.1 There is clear HR guidance for managers to follow when an employee leaves the
Council, particularly with the employee journey and managers checklist.  This
process also refers to the IT process.  However, the managers checklist does not
request a review of SharePoint or Teams sites to ensure the leaver is removed. 
The IT leavers process will remove IT access and prevent access to SharePoint
and Teams sites, however, the Senior Manager (HR&OD) was advised to update
the checklist as a housekeeping issue for site owners and this has been done.  
3.2 It should also be noted that the HR/Payroll leavers process and the IT leavers
process requires a manager to complete 2 separate forms resulting in 2 separate
processes that are not linked in any way.  
3.3 There is clear guidance on the IT portal for an employee leaving the Council. 
Movers Process for Network Access  
3.4 There is no separate process in the employee journey for employees moving posts
and there is no managers’ checklist for this process linking to the IT movers
process.  The employee journey for leavers does advise the termination/transfer
form should be completed and the termination reason should be recorded as
‘Transfer within NAC’.  This will notify Payroll that the employee is not leaving NAC
and a contract amendment form is to follow from the new service.  (action a)  
3.5 There is no clear guidance on the IT portal for an employee that is moving.  The IT
leavers form advises this form should only be completed if the employee is
completely leaving NAC and refers to an employee moving role or department
within the Council form that should be completed for movers.  However, this form
was deactivated in 2021.  The ‘Announcements’ section on the IT portal advises
movers should complete the ‘Access to files or folder’ request form to request new
network access.  There is an option to select ‘Yes’ if this access is required because
the user has just moved or is moving post within the next month.  However, this
form does not ask for the new post start date to ensure existing access is retained
until this date when the new access should be set up.  (action a)   
Leavers and Movers Process for System Access  
3.6 IT email a list of movers and leavers from the Payroll system on a monthly basis to
a number of key system administrators asking for the lists to be reviewed against
the users for their System and update as appropriate.  Internal Audit recommended
the wording of this email should be amended specifically state the action that
should be taken for leavers and movers.  The wording of the email was amended
during the audit. 
3.7 The auditor requested a list of all current users for the Payroll system, the EM Pro
customer relationship management system (formerly Lagan) and the Housing
system to carry out user testing.  There were no findings to report on the current
users for the Payroll system.
95

Page 96

3.8 The following findings were noted for the EM Pro system and were discussed with
IT staff who are administrators for this system and action has been taken to rectify
the findings:
• There were 8 users that could not be traced to the Payroll system or the email
system.  System admin confirmed all users were identified as duplicates or past
SPS Doorguard users and all were removed.
• There were 9 usernames that related to test or train accounts.  System admin
confirmed all test and train accounts have been removed and all testing will be
carried out on the training environment.
• There were no duplicate user IDs but there were 2 users with more than 1
username.  System admin confirmed all duplicate accounts have been
removed.
• There were 16 generic user IDs which were last logged on in 2021.  System
admin provided explanations for the purpose of each account.
• There were 33 external usernames identified, including 30 users that work for
SPS Doorguard.  System admin confirmed all SPS Doorguard users were
removed and the other accounts are required for system purposes.
• There were 31 leavers that still had access.  System admin confirmed all leavers
have been removed.  
3.9 The following findings were noted for the Housing system and were discussed with
the Team Manager/Housing Strategy & Dev and action has been taken to rectify
the findings:
• there were no duplicate user IDs but there were 12 users with more than 1
username.  The Team Manager advised that all have been contacted to find out
if both are required and will disable any that are not required.
• There were 3 generic usernames or user IDs.  The Team Manager advised one
has been disabled and the other 2 are required for system purposes.
• There were 119 leavers that still has access.  The Team Manager advised that
all leavers accounts have been locked.  
3.10 The auditor advised the Team Manager that the Housing system was not in receipt
of the IT monthly movers and leavers report and were not one of the IT systems
listed on the HR/Payroll Termination form.  The auditor requested via IT Services
that the Housing system and the Housing Abritas system are added to both
processes to ensure they are notified of movers and leavers to ensure leavers’ and
movers’ access is promptly removed.  This was rectified during the audit.   
Leavers and Movers Process for Office 365  
3.11 With the move to Office 365, employees may have access to SharePoint or Teams
sites as well as Outlook.  IT have amended the script in the AD Chris movers
process to link to O365 groups so the group owner will automatically be emailed
asking if the employee still needs access to groups they belong to.  No detailed
testing of this process was carried out due to budget constraints, however it has
been noted as an area for consideration within future audit plans.   
Sample Testing  
3.12 The auditor selected a sample of 10 leavers and all had completed the HR/Payroll
Termination forms before the leaving date.  However, only 3 out of 10 had
96

Page 97

completed the IT leavers form.  It should be noted that 1 of the IT leavers form was
completed after the leaving date.  
3.13 The auditor selected a sample of 10 movers and found the following:
• 5 previous managers completed the HR/Payroll Termination form with the
termination reason noted as transfer within NAC, 1 of which was completed
after the moving date
• All new managers completed the amendment form although 1 of these was
completed after the moving date.
• 1 of the amendment forms was not approved by an authorised signatory.
• There was 1 mover that could not be traced to a job on the IT portal requesting
new network access
• 5 of the movers had logged a job correctly via the folder access request form. 
The others were logged under employee starters, employee leaving, new start
and advised to update Chris record.
• There was 1 mover who had completed a folder access request form on
27/10/21, the employee moved on 08/11/21 and the employee advised IT on
11/11/21 their new network access had been removed so it had to be set up
again.
• There was one mover who completed the correct form but when IT queried the
specific folder access required, the line manager asked for the mover to be
cloned with another employee in the team.  Cloning of access is not
recommended due to the risk of including unnecessary additional access.
• There were 3 movers for whom the auditor queried the current network access
with the current line manager and in 2 cases they advised the mover should not
have access to all network groups listed. Therefore, the auditor advised they
contact IT to arrange for this access to be removed.
(action a)    
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the leavers and movers
processes.  There is clear guidance from HR and IT on the leavers process
although testing showed that managers are not completing the IT leavers form. 
There is no clear guidance from HR and IT on the movers process.  The AD Chris
movers process implemented as a result of a previous movers audit has improved
this process by ensuring network access removes all bar default network access
for movers who have not requested new network access via the IT Portal.    
97

Page 98

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
98

Page 99

KEY FINDINGS AND ACTION PLAN
MOVERS AND LEAVERS PROCESSES 
Action a
Finding There is no clear guidance on the IT portal for an employee that
is moving.  The IT leavers form advises this form should only
be completed in the employee is completely leaving NAC and
refers to an employee moving role or department within the
Council form that should be completed for movers.  However,
this form was deactivated in 2021.  The ‘Announcements’
section on the IT portal advises movers should complete the
‘Access to files or folder’ request form to request new network
access.  There is an option to select yes if this access is
required because the user has just moved or is moving post
within the next month.  However, this form does not ask for the
new post start date to ensure existing access is retained until
this date when the new access should be set up.  
Action Description IT Services should introduce a clear movers process for
managers to follow and should notify HR to allow the employee
journey to be updated accordingly.
Risk It is unclear what action managers should take and may result
in no action being taken. Inappropriate access may not be
removed or access may be removed while it is still required. 
Priority (1, 2, 3) 1
Paragraph Reference  3.4, 3.5, 3.13
Managed by Fiona Walker, Head of Service (People & ICT)
Assigned to Damien Lynn, Senior Customer Officer (ICT)
Due Date 31 October 2022
Management Comment IT Services will introduce new movers process on Hornbill
ITSM. IT Services will also work with HR to allow the employee
journey to be updated accordingly. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
99

Page 100

SOCIAL MEDIA 
1 Background  
1.1 This area was last audited in the 2017/18 audit year.  The action plan resulted in
the formation of a short-life working group to complete several of the actions.    
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• previous audit actions have been fully implemented.
• social media sites are set up in line with corporate policies and procedures and
adequate training is provided.
• there are appropriate controls in place to manage the Council’s Twitter &
Facebook accounts and access is restricted.
• adequate access controls are in place for other social media sites and relevant
information is available on the site.
• employees’ access to social media is restricted, training has been given for
investigation purposes and GDPR requirements regarding consent are being
adhered to.
• adequate advice has been issued to employees for personal use of social
media.    
3 Findings   
Implementation of Previous Audit Actions  
3.1 The 10 actions from the previous audit of Social Media in 2017/18 were followed
up.  All were found to have been implemented as agreed by the relevant services. 
As part of this implementation, an HR Social Media Guide was circulated to all
employees in June 2019.   
Compliance with Social Media Policies  
3.2 The Council has a Social Media Implementation Strategy which was updated in
February 2021 and is available on the Intranet, Connects.  The Council also has
Social Media Guidelines for customers which are published on the external website
together with a Digital Engagement Register which lists the Council’s Facebook
and Twitter pages.  There is employee guidance for setting up and managing social
media accounts and an e-learning module that supports this guidance.  
3.3 A sample of social media pages set up in the last 2 years were tested to ensure
that they had been set up according to the set procedure and all had followed the
procedure.  
3.4 During the audit 1 Instagram account for an HSCP service and 9 Twitter accounts
for schools were identified that had not been authorised, as well as a further school
Twitter account which had been set up despite the Head of Service declining to
authorise it.  Corporate Communications are liaising with the HSCP service to
ensure that the Instagram account meets the Council’s requirements and arrange
100

Page 101

retrospective authorisation.  Education were already aware that there was an issue
with schools setting up unauthorised Twitter accounts and details of the accounts
identified were passed to management for action.  Education are in the process of
preparing their own Digital Strategy which includes social media and have set up a
working party on social media. 
Controls around the Corporate Facebook and Twitter Accounts  
3.5 The Corporate Communications team provided information regarding the controls
over the corporate social media accounts.  No issues were identified.   
Social Media Use by the Council  
3.6 The sample of social media pages at 3.3 above were asked about user access
controls and the content of the pages.  No issues were identified concerning access
controls.  3 accounts had not included the Council’s Social Media Guidelines and
3 did not include their monitoring hours, but all committed to adding this information. 
No other issues were identified.  
3.7 A sample of school Twitter accounts was reviewed and the schools were asked to
complete a questionnaire.  One school had used a Gmail account in the school’s
name to set up the Twitter account.  They were advised to change this to a North
Ayrshire Council or Glow account and to close the Gmail account.  No other issues
were identified.   
Social Media Use by Employees for Work Purposes  
3.8 All IT users have read-only access to social media.  Read-write access needs to
be requested via the IT helpdesk with approval from the employee’s line manager. 
This access controls whether users can post from within the Council’s network, but
they can still access the social media sites outwith the Council’s network if they
know the credentials and therefore make posts.  Therefore the usefulness of this
control is very limited. 
3.9 IT provided a list of users with read-write access to social media.  This listed 432
users.  These were matched to current employees in the CHRIS payroll system. 
281 current employees were identified from this match and subsequent
investigation.  2 leavers were identified, although 1 was very recent.  IT arranged
to remove this access.  140 accounts belonged to NHS users.  5 accounts which
were never or no longer used were disabled, 1 account was required for election
software and 3 accounts were left with IT for further investigation.  
3.10 The data match exercise highlighted the large number of accounts allocated to
NHS users.  There is not a reliable mechanism for IT to be notified when NHS users
leave their posts.  This is a risk that has been highlighted in this test but it is not
appropriate to explore in further detail in the scope and budget of this audit. 
Therefore it will be explored in a future separate audit exercise.  
3.11 A sample of employees from the data match were sent a survey about how they
use the access.  None of the users surveyed used their access for investigation
activities which would be subject to Regulation of Investigatory Powers (Scotland)
Act (RIPSA) requirements. 
101

Page 102

3.12 The Council has arrangements in place to ensure that any officers using social
media for investigation purposes comply with RIPSA requirements.  
3.13 The Council has arrangements in place to ensure that GDPR requirements relating
to posting photos on social media are complied with.  All of the sample of social
media pages at 3.3 and the sample of schools at 3.7 confirmed that they obtain
consent before posting any photographs of individuals.   
Social Media Use by Employees for Personal Use  
3.14 Guidance has been issued to all employees regarding use of social media, as well
as specific guidance for Education and HSCP employees.    
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to social media use
throughout the Council.  Several unauthorised school social media accounts were
identified.  Education have already established a working group to review schools’
use of social media.  
4.2 140 NHS users with read-write access to social media were identified.  There is not
a reliable mechanism for IT to be notified when NHS users leave their posts.  It was
not appropriate to explore this issue in further detail within the scope and budget of
this audit.  Therefore it will be explored in a future separate audit exercise. 
Definitions of Assurance Levels: 
Substantial The framework of governance, risk management and control is
adequate and effective.
Reasonable
Some improvements are required to enhance the adequacy and
effectiveness of the framework of governance, risk management and
control.
Limited
There are significant weaknesses in the framework of governance, risk
management and control such that it could be or could become
inadequate and ineffective.
None
There are fundamental weaknesses in the framework of governance,
risk management and control such that it is inadequate and ineffective or
is likely to fail. 
NB The level of assurance given is at the discretion of Internal Audit.  
102

Page 103

VAT 
1 Background  
1.1 The Council incurs more input VAT (VAT on purchases) than it collects via output
VAT (VAT on charges for services) and is therefore in a net position of having paid
out tax that it is able to recover from HMRC.    
1.2 Monthly VAT returns allows the Council to recoup this cash timeously.  
1.3 HMRC can impose significant penalties on the Council if they believe any
inaccuracies in these returns are the result of carelessness, are deliberate or are
deliberate and concealed. 
2 Objectives and Scope  
2.1 The objective of this audit is to ensure:-
• Training and procedures are available to ensure staff understand the
Council’s VAT position 
• VAT returns are being submitted accurately and timeously
• The Council’s de minimis calculation is being reviewed regularly
• Input VAT in being correctly recorded within Integra 
3 Findings   
Training  
3.1 In order to ensure the correct classification and treatment of VAT on transactions,
it is important that officers understand the Council’s VAT status and what that
means, in addition to knowing how to process transactions within Integra. 
3.2 Audit reviewed the resources available to Officers and found those noted in
paragraphs 3.3 – 3.6 below.  
3.3 The Council has a VAT manual which covers general information such as:- 
• VAT classifications, 
• how to calculate VAT, 
• what constitutes a VAT invoice
• Tax points
• Accounting for VAT errors
• The importance of VAT planning 
but also looks at the specific transactions being undertaken by services and the
VAT treatment and implications of these.  
3.4 Supplementary information is circulated as necessary eg guidance notes on how
to deal with VAT charged by EU suppliers and VAT Planning for Land and
Property Transactions have been provided to staff.  
3.5 An online VAT awareness training course has recently been added to ILearn.  
103

Page 104

3.6 The mechanics of recording VAT is covered within system specific procedures. 
VAT returns  
3.7 Audit confirmed that all monthly VAT returns in 2021/22 were submitted timeously.  
3.8 The Council must make a voluntary disclosure to HMRC of any VAT correction
required that is greater than £50,000.  Financial Management have confirmed that
no such disclosures have been made during 2021/22.  
3.9 Minor VAT corrections can be made via monthly returns.  Audit reviewed all returns
in 2021/21 and only found 2 instances of minor adjustments having been made. 
These adjustments totalled £2,736 net.  
3.10 Audit also confirmed that the Council’s VAT suspense account is being reconciled
monthly.   
De Minimis Calculation  
3.11 The Council provides a number of services that are VAT exempt.  Normally no VAT
is chargeable on an exempt supply, and input VAT cannot be recovered.  
3.12 However, section 33 of the VAT Act 1994 allows the Council to recover this input
VAT so long as its value is deemed insignificant as compared to the Council’s
overall input VAT value.  
3.13 The de minimis calculation sets the maximum value of input tax relating to exempt
supplies that can be incurred (and reclaimed) whilst staying within the parameter
of ‘insignificant’.  
3.14 Should the Council exceed this maximum value then it would lose the ability to
reclaim all VAT incurred providing exempt services – not just the element that
exceeds the threshold.  
3.15 It is therefore important that the Council plans and monitors its exempt activities.  
3.16 The Council’s main exempt supply relates to the lease of properties and hall lets. 
Any significant transactions relating to such properties - such as purchases,
refurbishment or sales could have a significant impact on the total value of exempt
transactions.  
3.17 Financial Management have issued a document to all senior managers highlighting
the impact of land and property transactions on the Council’s overall VAT position. 
They have requested to be notified of all potential transactions and have issued a
‘VAT consideration form’ for completion. 
3.18 Financial Management have confirmed that the de minimis calculation is revisited
annually – with the latest recalculation being undertaken in September 21.   
Input VAT  
3.19 VAT can only be recovered if a valid VAT invoice is received and retained.
104

Page 105

3.20 Audit selected a sample of 24 invoices and 6 procurement card transactions to
verify that:-
• A valid VAT invoice is available in all instances where VAT has been
reclaimed
• Any VAT on invoices has been accurately reflected in Integra or SDOL  
3.21 No issues were noted during testing of the 24 invoices.  
3.22 Of the 6 procurement card transactions tested:-
• 2 transactions were found to have appropriate invoices, and had been
correctly coded in SDOL
• 1 transaction was found to have a VAT invoice, but the VAT hadn’t been
recorded in SDOL.  This means VAT of £132.47 has not been reclaimed by
the Council.  
• The card surcharge on one invoice had been incorrectly treated as VATable
by the cardholder.  As a result, the Council has incorrectly reclaimed £6.79
of VAT.
• 1 transaction was found to have no VAT invoice.  At the request of Audit, the
cardholder obtained a VAT invoice from the company which confirmed the
VAT on the transaction had been correctly recorded in SDOL. 
• 1 transaction was found to have no VAT invoice.  At the request of Audit, the
cardholder was able to obtain a VAT invoice from the company.  This invoice
included VAT, however the VAT element had not been recorded in SDOL. 
This means VAT of £36.66 has not been reclaimed by the Council. 
(action point a)  
3.23 Audit has also raised the above errors with relevant cardholders and their line
managers.  
3.24 Audit has liaised with Financial Management to ensure the above errors are
corrected via the Council’s next VAT return. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regards the Council’s treatment
of VAT transactions.  
4.2 Invoices being processed via Integra are being recorded properly, however some
issues with the identification and processing of VAT on procurement card
transactions is evident from Audit testing. 
105

Page 106

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
106

Page 107

KEY FINDINGS AND ACTION PLAN
VAT 
Action a
Finding VAT invoices are not always being obtained and/or recorded
correctly in SDOL for procurement card purchases.
Action Description Procurement card holders to be reminded of the importance of
obtaining VAT invoices for all purchases, and then reflecting
these accurately in SDOL.
Risk The Council is missing the opportunity to reclaim VAT that it is
entitled to. Evidence required by HMRC to support VAT being
reclaimed has not been retained.
Priority (1, 2, 3) 1
Paragraph Reference  3.22
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Quinn, Senior Manager (Corporate Procurement)
Due Date Completed
Management Comment An email was sent to all card holders from the Head of
Finance, stressing the importance of the treatment of VAT in
Pcard transactions and reminding all users to obtain a VAT
invoice and to upload the VAT invoice and complete the
relevant VAT information on the SDOL system. The email
also stressed that any continued incorrect recording of VAT in
Pcard transactions could result in removal of this facility. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
107

Page 108

OFF PAYROLL WORKING (IR35) 
1 Background  
1.1 IR35 (Off payroll working) was introduced by HMRC to tackle the issue of
individuals providing ‘employee type’ services to a company but doing so via a
Personal Service Company (PSC) so as to avoid having to pay PAYE and NI. 
1.2 Updates to the legislation in 2021 made it clear that the company receiving the
service is responsible for assessing whether an engagement lies within the scope
of IR35 and deducting the correct PAYE and NI if necessary.  
1.3 Fines and penalties can be imposed by HMRC if assessments are not carried out
or a lack of care and/or negligence results in incorrect assessments being made. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure council officers are aware of IR35 rules
and are taking steps to identify off payroll working. 
3 Findings  
3.1 Payroll maintains a separate payrun through which any tax deducted from PSCs is
processed.  Payroll have confirmed that no transactions have been processed
through this payrun in 2021/22.   
Procedures and processes  
3.2 HMRC looks for evidence of ‘reasonable care’ when assessing whether the Council
has fulfilled its responsibilities surrounding off payroll working.  
3.3 ‘Reasonable care’ can be evidenced, in part, by having robust procedures and
processes in place to support Council Officers.  
3.4 Audit reviewed the procedures and processes available to Officers and found:-
• The Council’s ‘Codes of Financial Practice’ document has been updated to
reference IR35.
• HR has a procedure called ‘Engaging Agency Workers and Personal
Service Companies’ which sets out Service roles and responsibilities,
explains how to assess engagements and gives worked examples and
flowcharts to support Officers.
• An online training course on off payroll working is available on ILearn. 
Senior Managers have been instructed to ensure all relevant staff have
completed this course.
• From December 2021, Corporate Procurement has added prompts to its
processes to remind Services to consider IR35 when procuring new
contracts.   
Engaging workers via Agencies  
3.5 When engaging workers via agencies, it is important to establish if the worker is a
direct employee of the agency (in which case the agency is responsible for dealing
108

Page 109

with PAYE and NI) or if the agency is simply acting as an intermediary to match up
independent workers with those seeking their services (in which case the Council
needs to consider if IR35 is applicable).  
3.6 The HR procedure sets out 6 questions to help assess whether each engagement
is within the scope of IR35.  It also directs officers to the HMRC assessment tool if
the 6 questions do not give a conclusive answer.  
3.7 IR35 requires the Council to send out a Status Determination Statement (SDS) to
the agency and worker to confirm the outcome of the assessment.  (action point
a)  
3.8 Audit analysed all expenditure coded to ‘Agency costs’ in 2021/22 and found that
the following services had used agency staff:-
• HSCP – Children, Families & Justice
• HSCP – Mental Health
• Building Services
• Waste  
3.9 Audit asked the above services to confirm that they had completed all the
requirements of IR35 prior to engaging agency staff.  
3.10 HSCP – Children, Families & Justice were unable to confirm whether or not IR35
had been considered prior to engaging staff.  (action point b)  
3.11 HSCP – Mental Health team did not consider IR35 prior to engaging staff. (action
point b)  
3.12 HSCP – Learning Disabilities team were unable to confirm whether or not IR35 had
been considered prior to engaging staff.  (action point b)  
3.13 Building Services – have a process in place where all agency appointments are
managed by a single officer.  A review of this process highlighted that whilst
elements of IR35 have been applied, not all requirements have been met. (action
point b)  
3.14 Waste – did not consider IR35 prior to engaging staff. (action point b)  
3.15 The above findings prompted Audit to review who has completed the online IR35
training.  This highlighted that not all officers who are dealing with potential IR35
transactions have completed the training. (action point c)   
Direct Engagement of PSC  
3.16 Services could also have contracted directly with a PSC i.e. not via an agency.  
3.17 Audit looked for evidence of such transactions by:-
• Reviewing a sample of 10 invoices coded to consultants fees
• Reviewing transactions with 5 local suppliers whose contract type and
company name might indicate a PSC.  
3.18 No issues were noted during testing.
109

Page 110

4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard Employee Services’
provision of procedures and guidance to Council Services.  Information and support
is available to Services and reliance is placed on Services making use of these
resources.  
4.2 Overall, limited assurance was obtained with regard to the application of IR35 within
Services. 
4.3 Building Services were the only Service using agency workers who could
demonstrate some consideration and application of IR35 in 21/22. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
110

Page 111

KEY FINDINGS AND ACTION PLAN
OFF PAYROLL WOKING (IR35) 
Action a
Finding The Council does not have its own Status Determination
Statement (SDS) template at present (although there is one
available on the HMRC website).
Action Description Employee Services to add a Status Determination Statement
(SDS) template to the HR ‘Engaging Agency Workers and
Personal Service Companies’ procedure
Risk Inconsistent communication with agencies/PSCs
Priority (1, 2, 3) 3
Paragraph Reference  3.7
Managed by Fiona Walker, Head of Service (People & ICT)
Assigned to Jackie Hamilton, Senior Manager (Employee Services)
Due Date 31 August 2022
Management Comment HMRC’s template will be added to the HR ‘Engaging Agency
Workers and Personal Service Companies’ procedure 
Action b(1)
Finding IR35 is not being considered, evidenced, and applied
consistently throughout the Council.
Action Description Services should revisit all agency staff transactions in 21/22
and assess whether these could have fallen within the scope
of IR35.  All decisions should be evidenced, and if deemed
within the scope of IR35 appropriate corrective action should
be taken.
Risk Council faces fines and penalties from HMRC for not correctly
applying IR35 legislation.
Priority (1, 2, 3) 1
Paragraph Reference  3.10
Managed by Alison Sutherland, Head of Service (Children, Families &
Justice)  
Assigned to Alison Sutherland, Head of Service (Children, Families &
Justice)  
Due Date 31 October 2022
Management Comment Children, Families & Justice (CFJ) accept the findings in the
report. 
The Head of Service will contact Internal Audit to identify
individuals/companies this audit refers to in order to revisit the
transactions from last year and assess against IR35 criteria to
ensure the process is applied consistently and evidenced. 
CFJ senior managers will complete the training module and
HoS will make IR35 an agenda item at an extended team
manager meeting to raise awareness. 
111

Page 112

HSCP will review our processes and change procedures to
identify one person in the partnership who will be responsible
for the IR35 checklist to make sure this does not happen again. 
Action b(2)
Finding IR35 is not being considered, evidenced, and applied
consistently throughout the Council.
Action Description Services should revisit all agency staff transactions in 21/22
and assess whether these could have fallen within the scope
of IR35.  All decisions should be evidenced, and if deemed
within the scope of IR35 appropriate corrective action should
be taken.
Risk Council faces fines and penalties from HMRC for not correctly
applying IR35 legislation.
Priority (1, 2, 3) 1
Paragraph Reference  3.11, 3.12
Managed by Thelma Bowers, Head of Service (Mental Health)
Assigned to Thelma Bowers, Head of Service (Mental Health)
Due Date 31 October 2022
Management Comment A review of practice has been undertaken within the service
which has identified a gap in knowledge regarding these
standing financial requirements. A programme of training will
be implemented to ensure compliance in this area of financial
management and all staff with this area of financial
responsibility have been made aware of the audit outcome.   
Action b(3)
Finding IR35 is not being considered, evidenced, and applied
consistently throughout the Council.
Action Description Services should revisit all agency staff transactions in 21/22
and assess whether these could have fallen within the scope
of IR35.  All decisions should be evidenced, and if deemed
within the scope of IR35 appropriate corrective action should
be taken.
Risk Council faces fines and penalties from HMRC for not correctly
applying IR35 legislation.
Priority (1, 2, 3) 1
Paragraph Reference  3.13
Managed by Yvonne Baulk, Head of Service (Housing & Public Protection)
Assigned to Leigh-Ann Mitchell (Senior Manager, Building Services
Governance)
Due Date 30 September 2022
Management Comment When recruiting agency workers Building Services have been
asking the 6 questions as set out by the HR procedure.  The
one requirement still outstanding relates to completion of the
Status Determination Statement, which is currently being
developed by HR.  Once this is made available Building
Services will complete this retrospectively for all agency
appointments from 2021/22.
112

Page 113

Action b(4)
Finding IR35 is not being considered, evidenced, and applied
consistently throughout the Council.
Action Description Services should revisit all agency staff transactions in 21/22
and assess whether these could have fallen within the scope
of IR35.  All decisions should be evidenced, and if deemed
within the scope of IR35 appropriate corrective action should
be taken.
Risk Council faces fines and penalties from HMRC for not correctly
applying IR35 legislation.
Priority (1, 2, 3) 1
Paragraph Reference  3.14
Managed by Thomas Reaney, Head of Service (Commercial)
Assigned to Wallace Turpie (Senior Manager Waste & Streetscene)
Due Date Complete
Management Comment Waste Services employed one agency driver for one period
for holiday cover. The agency has been contacted and
confirmed that they paid tax for this worker.  Head of Service
can confirm that agency labour will no longer be used in this
service area. 
Action c
Finding IR35 training hasn’t been completed by all relevant Officers.
Action Description Employee Services to remind all Heads of Service of the
importance of ensuring relevant staff have completed the
online IR35 training. 
A list of all staff who have completed the training course to be
circulated alongside the above communication.
Risk Council faces fines and penalties from HMRC for not correctly
applying IR35 legislation.
Priority (1, 2, 3) 1
Paragraph Reference  3.15
Managed by Fiona Walker, Head of Service (People & ICT)
Assigned to Jackie Hamilton, Senior Manager (Employee Services)
Due Date 31 August 2022
Management Comment Communications are scheduled on a 6 monthly cycle to remind
Services of the importance of adhering to IR35 regulations,
sign posting to the guide and training module. The next update
will be brought forward and will also include details of those
who have undertaken the training. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
113

Page 114

CM2000 SYSTEM 
1 Background  
1.1 The CM2000 system is a care management system used by HSCP. It is a
scheduling and monitoring system which allows visits to service users to be
scheduled, recorded and monitored. 
1.2 The Care at Home team use this system to schedule, record and manage care at
home visits that have been assessed and approved.  There are also 2 external
providers that use the CM2000 system for this purpose.  It is also used for
Community Alarms but this is a reactive service rather than a planned service.  
1.3 When a new service user is set up on CM2000 system, a CM2000 disc is set up
which links to mobile phones which have been allocated to Care at Home staff.  A
CM2000 tag is set up in the service user’s home.  This allows the rota to be provided
to Care at Home staff via the mobile device and will allow them to clock in and out
of the service user’s home to allow the time spent at each visit to be recorded on
the system. 
1.4 The Adult Services team do not key to the CM2000 system, but they have access
to the system to allow reports to be run for the external providers that carry out
approved visits to adults.   
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• There is a robust process in place for users that move post or leave the
Council and appropriate password controls are in place.
• Access permissions are appropriate to the job role ensuring segregation of
duties and high-risk areas are adequately restricted to key staff.
• Adequate controls are in place for interfaces to and from the CM2000 system
and accurate reports are produced.
• Adequate access controls are in place to protect personal/sensitive data on
mobile devices and the allocation and return of mobile devices is controlled.    
3 Findings   
System Access Controls  
3.1 The Business Support Officer advised that password security settings were set by
NAC but were passed to the provider to set up.  Password controls did not enforce
the need for an uppercase character and a special character; however, this was
rectified during the audit.  
3.2 The CM2000 system admin team do not receive the monthly leavers and movers
report emailed by IT.  This was rectified during the audit.   
System Users Controls  
114

Page 115

3.3 The auditor carried out testing on users of the system.  There were no leavers
identified, all were current employees with relevant permissions to the system.  
3.4 The user roles called ‘Super User’ and ‘Team Manager’ have very similar
permissions and system administrator duties should be restricted to Super Users
only.  There are 4 Super Users and 7 Team Managers that can reset passwords,
access system administration, and set up and maintain user accounts.  (action a)   
Interfaces and Reports  
3.5 The auditor reviewed the invoice checking process for Adult Services and tested a
sample of 5 invoices.  Although there were no findings to report from this testing, it
should be noted that the current invoice reconciliation process is manual and
resource intensive.  The provider invoice is manually reconciled to the CSV file
which is a file generated from the CM2000 system.  The CSV file is then checked
against the projections spreadsheet which details the service level agreements in
place as per the CareFirst system to ensure the correct charge has been invoiced. 
The team will investigate any overcharges.  (action b)  
3.6 The auditor reviewed the invoice checking process for Care at Home and tested a
sample of 5 invoices.  There were no findings to report from the invoice testing
process for the Care at Home team.   
Use of Mobile Devices  
3.7 Mobile phones are allocated to Care at Home Assistants to allow them to access
their daily rota and to clock in and out of each service users home.  There is a
record of who has been allocated a mobile phone and the mobile phones are
secured with a pin number to access the device, a password to access the NAC
company portal and an additional password to access the CM2000 app. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the system controls for
the CM2000 system.     
115

Page 116

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
116

Page 117

KEY FINDINGS AND ACTION PLAN
CM2000 SYSTEM 
Action a
Finding The user roles called ‘Super User’ and ‘Team Manager’ have
very similar permissions and system administrator duties
should be restricted to Super Users only.  Both groups can
reset passwords, access system administration, and set up
and maintain user accounts.  
Action Description System administrator functions should be restricted to ‘Super
User’ roles only.
Risk A user with too much access can manipulate the system to their
own benefit and avoid detection.
Priority (1, 2, 3) 2
Paragraph Reference  3.4
Managed by David Thomson, Head of Service (Health and Community
Care)
Assigned to Kerry Logan, Senior Manager (HSCP)
Due Date Complete
Management Comment The Team Manager user role has been amended to remove
access to system administrator permissions. 
Action b
Finding The current reconciliation process is manual and resource
intensive.  The provider invoice is manually reconciled to the
CSV file which is a file generated from the CM2000 system. 
The CSV file is then checked against the projections
spreadsheet which details the service level agreements in
place as per the CareFirst system to ensure the correct charge
has been invoiced and investigate any overcharges.  
Action Description Consideration should be given to investigating the use of a
more automated invoice checking process that would allow
overcharges to be highlighted and investigated.
Risk Manual checking process is more prone to human error which
could result in an overpayment.  Inefficient use of staff time.
Priority (1, 2, 3) 3
Paragraph Reference  3.5
Managed by Paul Doak, Head of Service (HSCP Finance and Transform)
Assigned to Eleanor Currie, Principal Manager - Finance
Due Date 31st August 2022
Management Comment A new process has been drafted and is being tested using the
July data.   Following testing, the adult finance team will be
trained and the process applied to the August data onwards. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
117

Page 118

FUNDING SUPPORT TO BUSINESSES 
1 Background  
1.1 On 16 March 2020, Health Secretary Matt Hancock announced to the House of
Commons all unnecessary social contact should cease. On 23 March 2020, the
first lockdown was announced, the Chancellor announced the Coronavirus Job
Retention Scheme for furloughed workers and a programme of funding support to
businesses was announced at various stages during the pandemic. This scheme
was devolved to the Scottish Parliament and local councils managed the
distribution.   
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• guidance issued by the Scottish Government is accurately relayed to staff
issuing grants
• systems were in place to distribute grant and that guidance was complied
with
• grants were issued to clients in a timeous and secure manner
• lessons learned from this experience are being built into future plans
including Business Continuity Plans (BCP) 
3 Findings   
Guidance  
3.1 The Scottish Government issued guidance relating to the grant funding schemes
announced on 18th March 2020. This guidance was continuously updated via the
Strategic Framework Funds Issues Log; by January, there were 114 responses to
requests made by local Authorities.  
3.2 In March 2020, small business grant fund and retail, hospitality and leisure grant
fund guidance were issued relating to two grants funding schemes:
• A one-off £10,000 small business grant to the ratepayers of properties with
specified uses in receipt of the Small Business Bonus Scheme (SBBS) or
Rural Relief, or eligible for SBBS but in receipt of Nursery Relief, Disabled
Relief, the Business Growth Accelerator Relief or Fresh Start. Certain
property uses are excluded.
• A one-off £25,000 grant to the ratepayers of properties in the retail,
hospitality and leisure sectors. Certain property uses are excluded. 
3.3 In total there were 20 different schemes administered by 4 different teams who
were best placed to access the relevant information to make decisions on grants.
Distribution teams had to be set up quickly. Revenues, who administrate rates for
the council, and Business Support, who had developed relationships with local
Businesses, administered the main tranches of grants. Growth and Development
administered hospitality grants, and Legal Services manage an administration team
for all the taxi applications to the council. 
3.4 Support process guidance to staff was clearly mapped on a flowchart.
118

Page 119

3.5 NAC used social media and its website to provide public advice. Staff were
available to provide guidance and support via the phone, using social media
accounts Twitter, Facebook, Linked in and YouTube. Publicity was maximised
using the Council’s website and social media. Applications were to be completed
online and grant specific links were created which all fed to unique mail boxes. 
Compliance  
3.6 In the 2020-21 financial year, the Scottish Government issued £1,806,663,060 in
support. North Ayrshire Council received £74,780,641 (2.3%). The distribution
process was negotiated by the Scottish Government and COSLA with local
authorities being deemed best placed to facilitate grant applications. 
3.7 Applications were to be made online and submitted via email. Each application was
submitted to a dedicated email address, allowing the application to be identified
and handled by the correct team. This also allows, in the event of one of the team
members becoming ill, access to the applications by the rest of the team. 
3.8 Internal audit examined two of the email  accounts: Business Grants and Taxi and
Private Hire Driver Grants (TPHD). 
3.9 The Business Grants account was the most sought-after support grant. In the
period March 2021 to December 2021 there were 3,098 emails posted on this
account. 
3.10 Taxi drivers were approached by NAC directly. 
3.11 A four-step escalation plan was put in place to resolve enquiries and any appeals.
Email evidence indicates that many enquiries were resolved at stage one with a
few at stage two. 
Payments 
3.12 Internal audit identified 2,222 applications for Business grant support and the
instruction to pay £2,287,500 for the period 1st April 2020 to 27th October 2020. Taxi
payments for 344 claims were paid with a value of £88,400. A sample of 25
business and 10 taxi grants were randomly selected and tested for completeness
of information. 
3.13 Business grant applicants submitted their application by email. 
3.14 The application form comprised of seven sections:-
1. Applications for grant of £10,000
2. Applications for grant of £25,000
3. About your business
4. Business details
5. Bank details
6. State Aid
7. Term and conditions 
119

Page 120

From the responses sampled some of the applicants had difficulty completing
sections 1 and 2 - from 3 questions, four didn’t provide a response and one
provided a response that made their application ineligible. Section 3 responses, to
five questions posed, were also incomplete – the lowest level of compliance related
to providing the business rates reference number and purpose of business at 79%.
In general, the other sections were complete. 
3.15 Taxi application responses were almost 100% complete with only a couple of
questions not responded to, for example two applicants did not provide postcode. 
3.16 Testing identified 78 potential duplicate payments, however further investigation
identified that these were either applications by the same company in different
locations, or by individuals with the same name. The reason they were highlighted
was the twelve-digit reference used for Integra postings were the first details of the
applicant’s name. Other checks into potential fraudulent claims are being
investigated independently through the Scottish Local Authority Investigators
Group. 
3.17 All the sample tested received appropriate grant payments. 
Future Planning 
3.17  Business Continuity Plans (BCP) reviewed included scenarios faced during the
pandemic. 
3.18 Audit Scotland issued a report “Principals for community empowerment” in July
2019, which identified what councils would need to achieve following the pandemic.
On 28th October 2021, an update report was issued, which identified the
disproportional effect of the pandemic on parts of the population and the role that
third party organisations had to play at this time. The report included a case study
for the Three Towns Hub, which has identified a concrete strategy for community
empowerment moving forward. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained regarding administration and
allocation of support grants during the COVID period. 
120

Page 121

Definitions of Assurance Levels: 
Substantial The framework of governance, risk management and control is
adequate and effective.
Reasonable
Some improvements are required to enhance the adequacy and
effectiveness of the framework of governance, risk management and
control.
Limited
There are significant weaknesses in the framework of governance, risk
management and control such that it could be or could become
inadequate and ineffective.
None
There are fundamental weaknesses in the framework of governance,
risk management and control such that it is inadequate and ineffective or
is likely to fail. 
NB The level of assurance given is at the discretion of Internal Audit.
121

Page 122

122

Page 123

NORTH AYRSHIRE COUNCIL
27 September 2022                                                                                                                                                            
Audit and Scrutiny Committee
Title: Counter Fraud and Corruption Strategy
Purpose: To advise the Audit and Scrutiny Committee of the Council’s
Counter Fraud and Corruption Strategy, which has recently
been refreshed to ensure it remains current.
Recommendation: That the Committee notes the refreshed Counter Fraud and
Corruption Strategy.
1. Executive Summary
1.1 In January 2015, Cabinet approved the Counter Fraud and Corruption Strategy,
setting out the Council's zero-tolerance approach towards fraud and corruption.
1.2 The Strategy was refreshed in 2016, in particular to make reference to the role of the
Corporate Fraud Team, which was not yet established when the Strategy was
approved in 2015.
1.3 The Strategy has been further refreshed to ensure it remains current.  The refreshed
Counter Fraud and Corruption Strategy is attached at Appendix 1.  Minor changes
have been incorporated throughout the Strategy; the most notable change is the
inclusion of Section 7 on Reporting.
2. Background
2.1 Those responsible for the conduct of public business and the handling of public money
will be held fully accountable for their conduct in accordance with the law and proper
standards. It is essential that public money is handled with absolute integrity,
safeguarded and properly accounted for and used economically, efficiently and
effectively.
2.2 To discharge its accountability to the local community, the Council has established
and will maintain proper arrangements for the governance of its affairs and the public
money at its disposal. The Council is committed to ensuring openness and
transparency in the provision of all its services.
2.3 The Council recognises that its resources may be the target of fraudsters, either
working outwith or inside the organisation. This Counter Fraud and Corruption
Strategy sets out how the Council aims to address the fraud risk it faces.
Agenda Item 10
123

Page 124

2.4 The Strategy highlights the areas of the Council's operations that are viewed as being
at greatest risk of fraud and corruption. These include: 
• employees
• information and cyber security
• procurement and contracts
• finance
• physical security of assets
• licensing
• planning
• housing tenancy
• council tax. 
2.5 The Strategy outlines a number of danger signs or 'red flags' to which the Council
must be alert in order to maximise the opportunity to identify potential frauds. 
2.6 The Council will follow 5 key steps in managing its approach to tackling fraud and
corruption. The approach covers proactive steps, aiming to prevent fraud and
corruption occurring, and reactive steps when suspected instances are identified.
These are: 
• deter
• prevent
• detect
• investigate
• enforce. 
2.7 In enforcing action, the Council will always pursue a triple-track response to any
instances of fraud or corruption which are found to be proven: 
• Disciplinary action
• Criminal proceedings
• Recovery action. 
2.8 In addition to this Strategy, the Council has a range of related policies and procedures
which staff and elected members are required to adhere to; these include the financial
regulations, codes of financial practice, standing orders relating to contracts,
'whistleblowing' policy and defalcation procedures. 
2.9 The responsibility for creating a strong anti-fraud culture lies both with Elected
Members, in particular the Cabinet and the Audit and Scrutiny Committee, and the
Extended Leadership Team. All members of staff must remain vigilant to the threat of
fraudulent activity and take the appropriate action if suspicions arise. 
3. Proposals 
3.1 It is proposed that the Committee notes the refreshed Counter Fraud and Corruption
Strategy. 
124

Page 125

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Counter fraud activity helps support the efficient delivery of the strategic priorities
within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation was required in refreshing the Strategy. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
125

Page 126

North Ayrshire Council 
Counter Fraud and 
Corruption Strategy 
Version: Final
Date: 13/09/2022
Author: Laura Miller
Classification: Public
126

Page 127

29/08/2022 Page 2 of 8 [PUBLIC]  
COUNTER FRAUD AND CORRUPTION STRATEGY 
1 Key Messages  
1.1 North Ayrshire Council has a zero-tolerance approach to fraudulent or corrupt activity,
whether perpetrated by employees, Elected Members, partner organisations,
suppliers or service users.  
1.2 All parties should remain vigilant to the threat of fraudulent or corrupt activity and
should alert the Council when suspicions arise.  
1.3 The Council will always investigate allegations of fraud by referring them to the
Corporate Fraud Team and thereafter, where appropriate, to the Crown Office and
Procurator Fiscal Service (COPFS).  
1.4 The Council can pursue a triple-track response to any instances of fraud or corruption
which are found to be proven: 
• Disciplinary action – any fraudulent or corrupt activity by employees will be
regarded as ‘gross misconduct’ and appropriate action will be taken under the
Council’s disciplinary procedures.
• Criminal proceedings – following the conclusion of any Corporate Fraud Team
investigation, fraudulent or corrupt activity may be referred on to Police
Scotland or reported directly to COPFS for their consideration of criminal
prosecution (with the approval of the Chief Executive).
• Recovery action – the Council will seek to recover any financial loss it has
suffered through fraudulent or corrupt activity, either through court proceedings
or by pursuing civil action. 
2 Introduction  
2.1 Those responsible for the conduct of public business and the handling of public money
will be held fully accountable for their conduct in accordance with the law and proper
standards. It is essential that public money is handled with absolute integrity,
safeguarded and properly accounted for and used economically, efficiently and
effectively.  
2.2 To discharge its accountability to the local community, the Council has established
and will maintain proper arrangements for the governance of its affairs and the public
money at its disposal. The Council is committed to ensuring openness and
transparency in the provision of all its services.  
2.3 The Council has adopted a zero-tolerance approach to fraud and corruption and will
always refer any allegations for investigation through the Corporate Fraud Team. The
Council may report findings to the COPFS where appropriate and will seek to recover
any losses due to fraud or other corrupt practices.  
2.4 The Council recognises that its resources may be the target of fraudsters, either
working outwith or inside the organisation. This Counter Fraud and Corruption Strategy
sets out how the Council aims to address the fraud risk it faces.  
127

Page 128

29/08/2022 Page 3 of 8 [PUBLIC] 
2.5 In addition to this strategy, the Council has a range of policies and procedures which
staff and Elected Members are required to adhere to and these are referred to
throughout this document.  
2.6 The responsibility for creating a strong anti-fraud culture lies both with Elected
Members, in particular the Cabinet and the Audit and Scrutiny Committee, and the
Executive Leadership Team. All members of staff must remain vigilant to the threat of
fraudulent activity and take the appropriate action if suspicions arise. 
3 Definitions  
3.1 A number of specialist terms are used throughout this strategy and general definitions
(which are not exhaustive) are provided below:  
3.2 Fraud – the provision of false or misleading information, the intentional distortion or
attempted distortion of statements and records and/or the misappropriation of assets
involving deception to obtain an unjust and illegal financial or other advantage.  
3.3 Corruption – the offering, giving, soliciting or acceptance of an inducement or reward
that may influence the actions taken by the Council, its Committees, Elected Members
or officers.  
3.4 Embezzlement – theft or misappropriation of funds placed in one’s trust or belonging
to one’s employer.  
3.5 Bribery – giving, soliciting, or receiving a financial or other advantage in connection
with the "improper performance" of a position of trust, or a function that is expected to
be performed impartially or in good faith. A bribe may be offered directly to an officer
to influence their actions or it may be given to another officer to influence the actions
of someone else.  
3.6 Money Laundering – the process in which the proceeds of crime are transformed into
what appears to be legitimate money or other assets.  
3.7 Theft – the dishonest appropriation of property belonging to another (including the
Council) with the intention of permanently depriving the other of it. 
4 Awareness of Fraud and Corruption Challenge  
4.1 The criminal threat presented by fraud is not a new one but the ways in which
fraudsters operate has developed significantly and is becoming ever more
sophisticated.  
4.2 Criminals are more organised than ever and their activities rely on significant levels of
planning and organising. Fraudsters share information online and build criminal
organisations across the UK and overseas. Tactics are constantly changing as
criminals respond to the intervention of organisations and take advantage of new
opportunities.  
128

Page 129

29/08/2022 Page 4 of 8 [PUBLIC]
4.3 In taking advantage of new opportunities, criminals exploit the latest technology. They
steal personal and financial data, both from individuals and organisations. They use
social networking to build trust with potential victims who either unwittingly or are
coerced into providing information to fraudsters.  
4.4 Fraud can be a primary activity for organised crime groups or it can provide funding
for other serious crimes. The organisers of fraud networks are often violent criminals
who are doing harm to communities, public services and businesses.  
4.5 However, not all frauds are perpetrated by organised crime gangs. There are a variety
of opportunistic frauds and those which require a degree of sophisticated planning –
often coupled with insider knowledge and access. Opportunistic frauds are facilitated
by dishonesty; a culture that tolerates fraudulent behaviour and does not always
acknowledge it as criminal; weak procedures, systems and controls; and lack of
information sharing between organisations.  
4.6 Fraud can cause significant damage to those affected. The annual fraud indicator
2017, which provides the last set of government sanctioned estimates, indicates that
identified and hidden fraud against the UK public sector amounts to an estimated £40.3
billion per year. An estimated £7.3 billion of this amount was in the local government
sector1.  
4.7 Losses on this scale have huge implications for already constrained budgets within
public bodies and undermine the effective provision of public services.  
4.8 Public sector bodies are an attractive target for fraudsters, who look to abuse the tax,
benefits and grants systems for personal gain. Furthermore, the public sector, like all
organisations, is subject to fraud risks against day-to-day business functions. A
number of the main service areas which have been identified as being at significant
risk of fraud are detailed below.  
4.9 Employees – any employee can perpetrate fraud against their employer. Types of
employee fraud are wide-ranging and can include misuse of time and resources,
fraudulent claims for allowances and expenses, failure to declare conflicts of interest
or the acceptance of gifts and hospitality, as well as the manipulation of finance and
payroll systems. One of the strongest defences against employee fraud is ensuring
that proper vetting takes place prior to employment. NAC has a range of relevant
policies that must be adhered to, including the Recruitment and Selection Policy,
Protection of Vulnerable Groups (PVG) Policy and Recruitment of Ex-Offenders Policy.
All members of staff are required to comply with the Employee Code of Conduct. It is
also essential that senior management ensures that clear internal controls and
segregation of duties are in place across the Council.  
4.10 Information and Cyber Security – this is an area of increasing public focus with a
number of recent high-profile incidents and attacks across the public sector. 
Councils hold a range of personal and sensitive information about individuals and
organisations which would be of interest to fraudsters. It is vitally important that the
Council has robust arrangements in place to protect the integrity of its data and
systems. Any loss brings the risk of reputational and financial damage to the Council
plus the adverse personal impact on those individuals affected by the cyber-enabled
fraud. 
1 https://www.cipfa.org/-/media/files/services/ccfc/cipfa-fraud-and-corruption-tracker-national-report-2020.pdf
129

Page 130

29/08/2022 Page 5 of 8 [PUBLIC] 
North Ayrshire has a range of information and cyber security policies, procedures, and
guidelines in place to help manage the risks related to data loss and cyber-attacks.
These include an Acceptable Use of ICT Policy, which all staff are required to sign up
to, Data Sharing Guidelines, Information Classification Guidelines, Cyber Incident
Response Plans and Data Protection Policy. 
The Council has both an Information Governance Team and a Cyber Security Team
to manage the information and cyber risks, implement controls which protect data and
systems, and respond rapidly to any reported incidents or attacks.  
4.11 Procurement and Contracts – procurement fraud covers the entire procure-to-pay
lifecycle, including fraud in the bidder selection and contract award stages (such as
illicit cartel activity or the bribery of an official to influence the tendering process) as
well as fraud occurring during the life of the contract (for example, false or duplicate
invoicing). The Council has a centralised procurement function for all non-social care
procurement and a dedicated social care commissioning team within the Health and
Social Care Partnership; both operate in accordance with the Council’s Standing
Orders Relating to Contracts and the procurement manual. The Corporate
Procurement Unit has a data-sharing protocol in place with Police Scotland and staff
are required to declare any conflicts of interest they may have.  
4.12 Finance – the Head of Service (Finance) has a responsibility to ensure that the
Council’s financial resources are used in accordance with agreed policy. A range of
monitoring and reporting processes are in place, in particular over the Council’s
revenue and capital budgets. The Council has financial regulations and codes of
financial practice, to which all staff are required to adhere, as well as approved treasury
management practices.  
4.13 Physical security of assets – Council assets (particularly buildings, cash, safes,
stores and computer systems) may be at risk through weaknesses in physical security.
Each Council building has a maintained alarm system, linked to an out-of-hours call
centre. Should any alarm be activated, the stand-by security contractor will arrange to
attend the property and undertake a security check. The police will be contacted if it is
deemed necessary.  
4.14 Licensing – many of the businesses that require licensing are those identified by
Police Scotland as being most commonly associated with organised crime gangs. The
Council operates a range of policies in relation to the various licences that are
available; these policies are made available to the public through the Council website.
A Licensing Board and Licensing Committee are in place to determine applications
and will make decisions in accordance with appropriate legislation based on
information provided by applicants and statutory consultees, including Police Scotland.  
4.15 Planning – legislation requires the determination of applications to be made in
accordance with the Development Plan, unless material considerations indicate
otherwise. The Development Plan has to be submitted to the Scottish Government
prior to adoption. The planning system has a series of checks for conformity with
national and local plans, together with an open and transparent procedure, through
the need for consultation and publicity at every stage of the decision-making process.
Offers of community benefit are not a material planning consideration and it is
important that decision makers are not induced to grant an otherwise unacceptable
consent through the promise of community benefits. Within NAC, there is democratic
130

Page 131

29/08/2022 Page 6 of 8 [PUBLIC]
accountability through the Committee structures in terms of the Local Development
Plan Committee, Planning Committee and Local Review Body, and the full Council
when required. Management structures within the service negate the possibility of
influence over an individual officer. The Councillors’ Code of Conduct has been
updated to clarify that community benefits are not a material consideration when
determining Planning applications. Community benefits are not managed within the
Planning Service and are dealt with entirely separately from and without reference to
the planning process. 
4.16 Housing tenancy – this can cover a wide range of fraud such as the provision of false
information to obtain social housing, unlawful sub-letting, false homeless applications
and false successions. Unlawful occupation of social housing results in reduced
availability of housing stock to legitimate applicants. The Council carries out a range
of identity checks on applicants for housing to help reduce the risk of tenancy fraud.  
4.17 Council tax – Council tax is a target for fraudsters, particularly through false claiming
of single person discount, vacant property relief or student occupancy or through the
Council Tax Reduction scheme. The Council participates in data matching initiatives
to identify potential fraud cases and these are investigated by the fraud team.  
4.18 The above list is not exhaustive and, as noted at 4.2, the tactics used by fraudsters
change over time and new fraud risks will continue to emerge. Increasing financial
constraints and changes to the way in which Councils deliver and manage their
services can all increase the risk of fraud. For example, the transfer of assets to
community groups could result in local authorities losing control of how assets and
funding are managed; with small organisations being less experienced in managing
public funds, the risk of financial mismanagement and abuse of funds could increase.
The Council must remain alert to such emerging fraud risks and ensure that good
governance structures and controls are in place to counter these.  
4.19 There are a number of danger signs or ‘red flags’ to which the Council must be alert in
order to maximise the opportunity to identify potential frauds. These include: 
• Significant changes in behaviour
• Individuals with large personal debts and a desire for personal gain
• Audit findings deemed to be errors or irregularities
• Transactions taking place at odd times, odd frequencies, involving unusual
amounts or to odd recipients
• Internal controls that are not enforced or often compromised by higher
authorities
• Discrepancies in accounting records or unexplained items on reconciliations
• Missing documents or only photocopies available
• Inconsistent, vague or implausible responses to enquiries
• Missing inventory or physical assets
• Common names or addresses of payees or customers
• Alterations on documents such as back-dating
• Duplications such as duplicate payments
• Collusion among employees, where there is little or no supervision
• Situations where one employee has control of a process from start to finish with
no or inadequate segregation of duties.  
131

Page 132

29/08/2022 Page 7 of 8 [PUBLIC]
5 North Ayrshire Council Approach  
5.1 The Council will follow 5 key steps in managing its approach to tackling fraud and
corruption. The approach covers proactive steps, aiming to prevent fraud and
corruption occurring, and reactive steps when suspected instances are identified.  
5.2 Deter – the Council will seek to maximise publicity around successful detection and
prosecution activity in order to deter potential fraudsters.  
5.3 Prevent – the Council will seek to prevent fraud by implementing strong internal
controls in all activities across the organisation. Heads of Service are responsible for
implementing and testing robust control mechanisms, which will also be subject to
periodic review by Internal Audit in line with the approved audit plan. The Council will
also seek to prevent fraudulent activity by raising awareness of this Strategy, along
with other key policies.  
5.4 Detect – the Council will actively seek to detect fraudulent activity through a number
of means. This will include: data sharing with key partners, such as through the
National Fraud Initiative (NFI); pro-active data matching between different systems
and data sets; encouraging whistleblowing by employees or members of the public;
regular management checks on the adequacy of internal controls, and reviews by
Internal Audit.  
5.5 Investigate – allegations of fraudulent activity will always be reviewed by senior
management and referred to the Corporate Fraud Team for investigation where
appropriate. This will be done in line with the Council’s approved defalcation
procedures. As well as recommendations for enforcement actions, an investigation by
the Corporate Fraud Team will result in a range of recommendations to tighten controls
to help prevent a future reoccurrence.  
5.6 Enforce – the Council will always pursue a triple-track response to any instances of
fraud or corruption which are found to be proven: 
• Disciplinary action – any fraudulent or corrupt activity by employees will be
regarded as ‘gross misconduct’ and appropriate action will be taken under the
Council’s disciplinary procedures.
• Criminal proceedings – following the conclusion of any Corporate Fraud Team
investigation, fraudulent or corrupt activity may be referred on to Police
Scotland or reported directly to COPFS for their consideration of criminal
prosecution (with the approval of the Chief Executive).
• Recovery action – the Council will seek to recover any financial loss it has
suffered through fraudulent or corrupt activity, either through court proceedings
or by pursuing civil action. 
6 Key Partners  
6.1 The Council will maintain arrangements with other public agencies to encourage the
exchange of information about fraud and corruption. Any exchange of data is
undertaken in accordance with the principles of the Data Protection Act 2018 and
UKGDPR.  
6.2 These agencies include:
132

Page 133

29/08/2022 Page 8 of 8 [PUBLIC]
• Police Scotland – both at local level and through the national Public Sector
Counter Corruption Unit (PSCCU).
• Crown Office and Procurator Fiscal Service (COPFS)
• Other local authorities
• Local and national Internal Audit and Corporate Fraud networks
• The National Anti-Fraud Network (NAFN)
• Audit Scotland
• Department of Work and Pensions (DWP)
• Chartered Institute of Public Finance and Accountancy (CIPFA)
• The Council’s insurers, currently Zurich Municipal.  
6.3 The Council also participates in the UK-wide National Fraud Initiative (NFI), which
allows the secure sharing of data between public bodies and highlights potential
fraudulent activity for further investigation. The Cabinet Office processes the data
provided by the participating organisations. 
7 Reporting  
7.1 This strategy reinforces the Council’s approach to dealing with fraud by setting out the
way in which members of the public can report their concerns around suspected fraud.  
7.2 The Council wants to know about fraud, corruption, embezzlement, bribery, money
laundering and theft as generally defined at paragraphs 3.2 – 3.7 above.  
7.3 Employees and Elected Members are expected to raise any concerns they have,
without fear of recrimination.  The Council also encourages members of the public who
suspect fraud in the Council to contact North Ayrshire Council.  The following reporting
mechanisms are in place: 
By telephone to the Corporate
Fraud Team
01294 324585
01294 324586
By email to the Corporate
Fraud Team
corporatefraud@north-ayrshire.gov.uk
By writing to the Corporate
Fraud Team
North Ayrshire Council Corporate Fraud Team,
2nd Floor,
Cunninghame House,
Irvine,
KA12 8EE.
Twitter @NAC_CorpFraud
Facebook Corporate Fraud Team, North & East Ayrshire
Councils 
7.4 Further information on the Corporate Fraud Team can be found on our website at
www.north-ayrshire.gov.uk/council/fraud-against-the-council.aspx  
7.5 For suspected Housing Benefit fraud, the Department for Work and Pensions (DWP)
should be contacted via https://www.gov.uk/report-benefit-fraud 
133

Page 134

134

Page 135

NORTH AYRSHIRE COUNCIL
27 September 2022
Audit & Scrutiny Committee
Title: Annual Assurance Statement to the Scottish Housing
Regulator 2021/22
Purpose: To advise the Committee of the Council’s Annual Return on the
Charter 2021/22 submission, and request endorsement of the
Annual Assurance Statement to be submitted to the Scottish
Housing Regulator.
Recommendation: That the Committee: (i) notes the Annual Return on the Charter
submission 2021/22; (ii) notes the supporting evidence provided
to demonstrate compliance with the regulatory framework; (iii)
notes the Council’s Covid related non-compliance with our gas,
electrical and fire safety legal responsibilities, but also notes
that all outstanding gas safety checks for 2021/22 have now
been carried out; and (iv) authorises the Chair to sign the
Annual Assurance Statement at Appendix 1.
1. Executive Summary
1.1 The Scottish Housing Regulator’s framework for the regulation of social housing in
Scotland includes the requirement for an Annual Assurance Statement to be
submitted alongside the Annual Return on the Charter (ARC). The statement must be
approved by the appropriate Committee within the organisation prior to submission.
1.2 This report provides information on performance reported in the ARC, highlighting
areas of high or improving performance, declining performance, or requiring
improvement, and areas of non-compliance attributable to the COVID-19 pandemic
and supply chain issues. The report also provides information on how the Council
gains assurance that it is compliant with the Regulatory Framework.
1.3 Endorsement of the Annual Assurance Statement will ensure that the Council
complies with regulatory requirements set out in the Housing (Scotland) Act 2010.
2. Background
2.1 The Housing (Scotland) Act 2010 sets out the statutory objectives, functions, duties
and powers of the Scottish Housing Regulator (SHR), a non-ministerial department
responsible for regulating social housing in Scotland.
Agenda Item 11
135

Page 136

2.2 In 2012, the Scottish Government’s Social Housing Charter was established. It sets
out the standards and outcomes that tenants, homeless people, homeowners, and
gypsy/travellers can expect from social landlords. This is monitored via landlords’ ARC
submissions to the SHR. 
2.3 In February 2019, the Scottish Housing Regulator issued a revised framework for the
regulation of social housing in Scotland. The new framework includes the requirement
for landlords to submit an Annual Assurance Statement which has been agreed by a
Board or Committee within the organisation. The Council must provide assurance that
it complies with the relevant requirements of Chapter 3 of the Regulatory Framework. 
2.4 The Assurance Statement is confirmation that, as a landlord, the Council: 
• meets all legal duties and responsibilities, and adheres to relevant guidance and
the requirements of other regulators
• meets its statutory duties to prevent and alleviate homelessness
• adheres to statutory guidance from the Scottish Housing Regulator
• takes account of regulatory advice from the Scottish Housing Regulator and from
other regulators
• complies with all regulatory requirements 
The Council must also confirm plans to fix any instances where there is a material
non-compliance and notify the SHR about any material changes in their level of
assurance during the year. 
2.5 The SHR has requested that landlords provide assurance in their Statement that they
have appropriate plans to implement an effective approach to the collection of
equalities information and that they have started to consider how they can adopt a
human rights approach in their work. 
2.6 As a landlord, we collect data relating to each of the protected characteristics for
existing tenants, new tenants, people on waiting lists, governing body members, staff,
people who apply to us as homeless and service users on our Gypsy/ Traveller site.
We are currently undergoing a system review alongside our partner landlords within
the North Ayrshire Housing Register and have incorporated equalities data into the
brief for the review to further develop our approach. We have also begun to consider
how we can adopt a human rights approach in our work. Guidance issued by the
Scottish Housing Regulator in 2021 will further inform this strategy. 
Performance 
2.7 The revised performance framework issued in early 2019 resulted in the removal of
some historical indicators, introduction of new performance measures and changes in
some methods of calculation. 
2.8 Whilst comparative information from other local authorities for the 2021/22 ARC is not
yet available, the 2020/21 comparisons from the Scottish Social Housing Charter
show that North Ayrshire Council remains a high performing local authority housing
service. Of the 43 indicators reported in 2021/22 ranked against other Scottish local
authorities, North Ayrshire is in: 
136

Page 137

• The top quartile for 24 indicators (60%)
• The second quartile for 4 indicators (10%)
• The third quartile for 4 indicators (10%)
• The bottom quartile for 8 indicators (20%) 
2.9 It was reported in the 2020/21 Annual Assurance Statement report that levels of
performance were unlikely to be maintained or improved in the 2021/22 ARC return,
due to the ongoing impact of the COVID-19 pandemic. This position should, however,
be reflected nationally. When the 2021/22 comparisons are published, indicators will
be scrutinised to determine areas where this is not the case, and improvement plans
developed. 
2.10 The areas highlighted below identify key areas of high/improving performance and
areas where there has been a decline or improvement is required. 
Areas of high or improving performance 
2.11 Tenant satisfaction is high in terms of overall services as a landlord, and opportunities
for tenants to participate and keep informed about services and decisions.
Performance in this area is based on our tri-annual tenant satisfaction survey, which
took place during summer 2021 to provide an updated position for the 2021/22 ARC
submission. 
2.12 The average length of time taken to complete emergency repairs reduced from 3.45
hours in 2020/21 to 2.61 hours, and from 9.75 to 7.66 days for non-emergency
repairs. The increase in performance is more in line with pre-pandemic figures whilst
Building Services continued to comply with COVID-19 guidance and the shortage of
materials and labour. 
2.13 The average time taken to re-let properties decreased from 27.13 days in 2020/21 to
22.38 days in 2021/22. Void turnaround times are returning to pre-pandemic
performance levels. A review of the void process is ongoing to identify further
improvements. 
2.14 The percentage of antisocial behaviour cases resolved during 2021/22 was 84.24%,
which is slightly higher than the previous year’s performance of 82.97%. The method
of calculation for the ARC does not consider that cases may open close to the end of
the reporting year, or may be complex, and are therefore not closed in the same
reporting year. Our internal performance reporting confirms that 99.3% of cases were
resolved within target during 2021/22. There has been a 17% decrease in reported
antisocial behaviour since 2020/21. 
2.15 Whilst the number of court actions resulting in eviction has significantly decreased
from 33.33% in 2020/21 to 0% in 2021/22, this is because, in line with COVID-19
guidance, no court actions were initiated, for rent arrears, antisocial behaviour, or
other reasons. 
137

Page 138

Areas with a decline in performance or requiring improvement 
2.16 There has been a decline in performance relating to the adaptations process, with the
number of households waiting on an adaptation to their home increasing from 12 in
2020/21 to 142 in 2021/22. The average number of days to complete an approved
adaptation also increased from 54.79 to 74.33.  A joint improvement group with
membership from the Health and Social Care Partnership, Housing, Building Services
and Property Management and Investment has been reviewing this process to
consider ways to achieve the best possible outcome for tenants. 
2.17 The percentage of tenancy offers refused during the year increased slightly from
32.99% to 34.76%. This may be attributable to an overall increase in lets and a
reduction in lets to homeless customers. 
2.18 Satisfaction levels of tenants who had repairs or maintenance carried out in the last
12 months has decreased from 86.73% to 85.71% since 2020/21. This is based on
responses from 98 tenants in 2020/21 and 2021/22 – an unusually low number due to
the survey process being affected by the pandemic. 
2.19 Gross rent arrears as a percentage of rent due increased from 5.46% in 2020/21 to
6.63% in 2021/22 despite ongoing communication with, and support to, tenants in
arrears throughout the pandemic. Although a slightly improved position has been
observed in recent months, rent arrears accrued during the pandemic are at a level
where it will be extremely difficult for many households in North Ayrshire to recover
from, given the impact COVID-19 has had on the economy and employment
prospects. 
2.20 Homelessness applications have increased by 14% in the last 12 months compared to
a national average of 3%. There continues to be a significant proportion of households
being asked to leave their home by either family or friends; in addition, we have seen
an increase in action taken by landlords to recover their tenancy. 
2.21 During 2021/22 there was a 10% decrease in tenants claiming Universal Credit. This
decrease is broadly similar to the national reduction in those in receipt of Universal
Credit and is due to recovery from the COVID-19 pandemic. The arrears attributed to
these tenants (with technical arrears removed) has decreased by 15%, in comparison
to an increase of 108% the previous year. A review of our welfare rights and debt
advice cases indicates that tenants are experiencing significant financial difficulty due
to pandemic, which is expected to worsen with the cost of living rising over the winter
months. 
Area of non-compliance 
2.22 During 2021/22, 360 properties did not receive their annual gas safety check within
the statutory timescales. There is still ongoing reluctance by some tenants to grant
access to their property due to their concerns about risk of COVID-19 transmission.
During 2021 we implemented our access policy, which enabled forced entries to
recommence, however whenever a tenant cited COVID-19 this process was halted,
with an alternative later date agreed with the tenant. 
138

Page 139

2.23 Under normal circumstances, this level of non-compliance would be deemed material
and merit a notification to the Regulator. As this non-compliance was a direct result of
the COVID-19 pandemic and all efforts were made to ensure compliance at the
earliest opportunity, it is not considered material.  All outstanding gas safety checks
from 2021/22 have now been carried out. 
2.24 During 2021/22 new legislation was introduced which reduced the statutory inspection
regime for electrical installations from ten to five years. Despite engaging two
contractors, 6,090 properties were non-compliant at the end of 2021/22. 
2.25 Our Property Management & Investment team have procured a third contract to
accelerate the testing programme. However, accessing properties remains a
challenge, with a 50% average access rate. Our Building Services team have
commenced working at weekends to assist in reducing the number of outstanding
inspections. During 2022 PMI have implemented the Council’s access policy to enable
electrical inspections to be undertaken, similar to the arrangements already in place
for gas compliance checks. It is anticipated that all outstanding properties will be
compliant by the end of March 2023. 
2.26 Also during 2021/22, new legislation was introduced with regards to smoke detection
equipment. At the end 2021/22, 735 of our properties were non-compliant due to
access issues. 
2.27 During 2022 the Council’s access policy was again implemented for this area of
compliance. It is anticipated that all outstanding properties will be compliant by the
end of March 2023. 
Assurance 
2.28 The overall performance of the Housing Service is continuously reviewed by the Head
of Service and Housing Senior Management Team, with key performance information
and action plans presented to the North Ayrshire Network, Housing Business Plan
Group and Council’s Cabinet regularly during each year. 
2.29 Some ARC indicators also form part of the corporate performance monitoring
framework, scrutinised by Chief Officers and elected members. 
2.30 The Scottish Federation of Housing Associations (SFHA) Self Assurance Toolkit has
also been utilised as a further method of self-assessment. The toolkit provides
guidance to social landlords on gathering evidence to demonstrate compliance with
regulatory requirements and standard and focuses on questions that governing bodies
should ask to gain assurance that this is being achieved. 
2.31 The ARC 2021/22, which can be accessed at Annual Return on the Charter (north-
ayrshire.gov.uk), demonstrates the Council’s performance against the outcomes in the
Scottish Social Housing Charter. 
2.32 Supporting evidence to demonstrate compliance with the regulatory framework and
relevant legislation can be accessed at AAS Supporting Evidence (north-
ayrshire.gov.uk). 
139

Page 140

2.33 The Annual Assurance Statement, which is attached at Appendix 1, confirms that the
Council has complied with the regulatory framework, all standards, and outcomes. It
highlights North Ayrshire’s non-compliance with our legal responsibilities around gas,
electrical and fire safety. It also confirms the equalities data currently captured, and
that North Ayrshire is considering how to adopt an increased human rights approach
in our work. This Statement will be made available to tenants as part of the Council’s
performance reporting process. 
3. Proposals 
3.1 It is proposed that the Committee (i) notes the Annual Return on the Charter
submission 2021/22; (ii) notes the supporting evidence provided to demonstrate
compliance with the regulatory framework and relevant legislation; (iii) notes the
Council’s Covid related non-compliance with our legal gas, electrical and fire safety
responsibilities due to the COVID-19 pandemic, but also notes that all outstanding gas
safety checks for 2021/22 have now been carried out ; and (iv) authorises the Chair to
sign the Annual Assurance Statement at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 Approval of the Annual Return on the Charter submission 2021/22 and supporting
evidence, and signature of the Annual Assurance Statement, will ensure that the
Council complies with regulatory requirements set out in the Housing (Scotland) Act
2010. 
Equality/Socio-economic 
4.4 None 
Environmental and Sustainability 
4.5 None 
Key Priorities 
4.6 None 
Community Wealth Building 
4.7 None 
140

Page 141

5. Consultation 
5.1 Consultation has taken place with Services within Housing and Public Protection;
Sustainability, Transport and Corporate Property; Corporate Performance; the Health
and Social Care Partnership; and the Scottish Housing Regulator during the
preparation of the Annual Return on the Charter and Annual Assurance Statement. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Fiona Ellis, Senior Manager (Housing Strategy &
Development, on 07795 805570. 
Background Papers
0
141

Page 142

North Ayrshire Council
Annual Assurance Statement 
2021/22 
North Ayrshire Council complies with the requirements set out in Chapter 3 of the
Regulatory Framework. North Ayrshire Council is assured that we: 
 Adhere to relevant guidance and the requirements of other regulators;
 Meet our statutory duties to prevent and alleviate homelessness;
 Adhere to statutory guidance from the Scottish Housing Regulator;
 Take account of regulatory advice from the Scottish Housing Regulator and from
other regulators; and
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance. 
We did not meet our legal obligations around tenant and resident safety as we did not
comply with gas safety legislation for 360 properties during 2020/21.  Due to new
legislation introduced during 2021/22 regarding electrical testing and smoke detection
equipment, 6,090 properties were non-compliant with regards to having an EICR and
735 for not having the new smoke detection equipment installed.  There is an ongoing
reluctance by some tenants to grant access to their property due to their concerns
about risk of COVID-19 transmission.  Labour shortages within the electrical industry
affected the testing programme alongside access issues.  All efforts were made to
ensure compliance at the earliest opportunity and appropriate records were kept. 
As a landlord, we collect data relating to protected characteristics for existing tenants,
new tenants, people on waiting lists, governing body members, staff, people who apply
to us as homeless and service users on our Gypsy/Traveller site.  We are currently
undergoing a system review alongside our partner landlords within the North Ayrshire
Housing Register and have incorporated equalities data into the brief to further
develop our approach.  We have also begun to consider how we can adopt a human
rights approach in our work.  Guidance issued by the Scottish Housing Regulator in
2021 will further inform this strategy. 
North Ayrshire Council’s Audit and Scrutiny Committee has considered sufficient
evidence to give this assurance.  The Annual Assurance Statement was approved by
Audit and Scrutiny Committee on 27 September 2022. 
Authorised by:________________________ 
Chairperson of the Committee 
Printed name: ________________________ 
Date:_______________________________
142

Page 143

North Ayrshire Council
Housing Services 
Annual Assurance Statement
2021/22 
Supporting Evidence
September 2022
143

Page 144

Introduction 
In February 2019, the Scottish Housing Regulator (SHR) issued a revised framework for the regulation of social housing in Scotland.  The new
framework includes the requirement for landlords to submit an Annual Assurance Statement which has been agreed by a Board or Committee within
the organisation.  We must provide assurance that the organisation complies with the relevant requirements of Chapter 3 of the Regulatory Framework. 
This document provides evidence to support our Statement that North Ayrshire Council is assured that we:
✓ Adhere to relevant guidance and the requirements of other regulators;
✓ Meet our statutory duties to prevent and alleviate homelessness;
✓ Adhere to statutory guidance from the Scottish Housing Regulator;
✓ Take account of regulatory advice from the Scottish Housing Regulator and from other regulators; and
✓ Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance. 
As a landlord, we are also required to meet all legal duties and responsibilities.  During 2021/22 we were unable to do this, as some properties did
not have an annual gas safety check, electrical safety certificate or installation of the new smoke detection equipment within the legal timescales due
to the continued impact of COVID-19 on gaining access to tenants’ homes.  We have provided information on this non-compliance in our Annual
Assurance Statement and further detail in this supporting evidence. 
In August 2020, the Scottish Housing Regulator published advisory guidance to assist landlords to adapt their approach to the submission of the AAS
to reflect the impact of the pandemic.  They requested that landlords include their position in relation to equalities and human rights in the 2021 Annual
Assurance Statement. At that time, it was anticipated that the guidance on equalities data collection would have been available to landlords, however,
the impact of the COVID-19 pandemic has slowed the production of that guidance, which became available following the 2021 submission.   
In recognition of this position, the SHR has requested that landlords provide assurance in their Statement that they have appropriate plans to implement
an effective approach to the collection of equalities information and that they have started to consider how they can adopt a human rights approach
in their work. 
144

Page 145

Regulatory Requirements 
Assurance and notification
We prepare an Annual Assurance Statement in accordance with guidance and submit it to the Scottish Housing Regulator (SHR) annually.  The
statement is available to tenants and other service users.  We will notify the SHR during the year of any material changes to our assurance as set out
in the Statement.   
We can evidence that we meet all legal obligations associated with housing and homelessness services, and equality and human rights. 
We have not met our legal obligations around tenant and resident safety as we did not comply with gas safety legislation for 360 properties during
2021/22.  Due to new legislation introduced during 2021/22 regarding electrical testing and smoke detection, 6,090 properties were non-compliant
with regards to having an EICR and 735 for smoke detection There continues to be an ongoing reluctance by some tenants to grant access to their
property due to their concerns about the risk of COVID-19 transmission.  All efforts were made to ensure compliance at the earliest opportunity and
appropriate records were kept, we have not considered this a material non-compliance.   
We notify the SHR of any tenant and resident safety matters involving the Health and Safety Executive or reports from other regulatory bodies relating
to safety concerns.  There were no issues to report during 2021/22. 
‘Customer Connections’, our Tenant Participation Strategy, is available to tenants and service users on the Council website.  
Customer Connections Strategy (north-ayrshire.gov.uk) 
Tenant and service user redress
Information on how to report any concerns around significant performance failures is available to tenants.  Further information is contained in the
Scottish Housing Regulator leaflet. 
North Ayrshire Council’s Complaints Handling Procedure is readily available to tenants and other service users.  It sets out the information they need
to exercise their right to complain and seek redress.  Responses are provided within timescales set out in the Procedure, in accordance with guidance
from the Scottish Public Services Ombudsman (SPSO).  We have mechanisms in place to learn from complaints and other tenant and service user
feedback, in accordance with SPSO guidance. 
Whistleblowing
North Ayrshire Council has a policy and procedure in line with the Public Interest Disclosure Act 1998 for whistleblowing by staff and elected members. 
This is readily available on the Council website and promoted through staff bulletins.   
145

Page 146

Equalities and human rights
Equality is one of the North Ayrshire Council's core values.   The principles of equality and fairness are central to all council activities.  Our Equality
and Children’s Rights Impact Assessment process for all policies, procedures and proposals ensures we meet legislative requirements.  All decisions
made by the Council’s committees include an assessment of equalities implications. 
As a landlord, we collect data relating to each of the protected characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who apply to us as homeless and service users on our Gypsy/Traveller site.  We are currently undergoing a system
review alongside our partner landlords within the North Ayrshire Housing Register and have incorporated equalities data into the brief to further
develop our approach. 
We have also begun to consider how we can adopt a human rights approach in our work.  Guidance issued by the Scottish Housing Regulator in
2021 will further inform this strategy. 
Scottish Social Housing Charter Performance
We submit an Annual Return on the Charter to the Scottish Housing Regulator annually in accordance with published guidance.  We have agreed our
approach to this through the North Ayrshire Network (NAN), a group of representatives from the various Registered Tenant Organisations in North
Ayrshire.  You can read about our approach in Customer Connections, our Tenant Participation Strategy 2017-22. 
Each year, we report on performance in our autumn edition of Tenancy Matters.  The NAN work with us to agree the content of the report, which
includes comparisons with previous years, other landlords and national performance.  Within this report we identify how we will address areas for
improvement and ask for feedback on our approach. 
146

Page 147

Standard 1 – The customer / landlord relationship 
Outcomes: 
Equalities
We promote equality and embrace diversity in all parts of Housing Services.  All the information we produce is in line with the Council’s
Communications Strategy. All leaflets, and a number of documents, are published in Plain English and can be made available in large print, braille,
tape or CD, and can be translated on request. 
Communication 
Housing Services provide a comprehensive range of information available in some leaflets, on the Council website and on social media.  The Tenant
Editorial Panel approves all leaflets prior to issue to ensure they are fit for purpose and easy to understand. Our ‘tenant approved’ logo shows tenants
have endorsed our publications. In recent years we have developed a social media profile through Facebook and Twitter to encourage digital
engagement with a wider and more diverse customer base.   
We commission an independent organisation to undertake a tenant satisfaction survey at least every three years.  The results of this help us to focus
our efforts in improving communication and participation and understand what is important to our customers.  We carried out our survey during
summer 2021 with the next one scheduled for summer 2024. 
Participation
The North Ayrshire Network (NAN) customer group has responsibility for ensuring that we continually improve the way we deliver services to tenants
and customers. Part of their role is to challenge our performance against the indicators, outcomes and standards in the Charter.  To do this, Housing
Services report to the Network through presenting on performance both mid-year and prior to submitting the Charter annually, working together on
developing our annual report to tenants and communicating any changes from the Scottish Housing Regulator directly to the group. 
Our Tenant Inspection Panel scrutinise one area of service per year. They can decide this independently through review of our performance
information, or with support from Officers. Scrutiny provides an opportunity for tenants to drive improvement in the services most important to them. 
This process continued virtually during the pandemic. 
Customer Connections, our Tenant Participation Strategy for 2017 – 2022 encompasses and reflects the requirements of the Scottish Social Housing
Charter and the Council’s priorities. These support communities’ tenants and residents to grow and develop opportunities for active engagement and
participation for all citizens by listening to local needs and aspirations. 
147

Page 148

Our latest tenant satisfaction survey told us that 92% of tenants are satisfied with the opportunities given to them to participate in our decision-making
processes. 
Standard 2 – Housing quality and maintenance 
Outcomes: 
Quality of housing
Our housing stock is in very good condition and is well maintained. We take a proactive approach to housing asset management and target
improvements to ensure that our properties are SHQS and EESSH compliant. Properties are refurbished to ensure they remain attractive, meet
modern requirements and tenant expectations. We have a range of planned maintenance programmes which are designed to achieve economies by
replacing major element components just before they would otherwise require responsive repairs; anticipate changes in minimum acceptable
standards; and reduce future requirements for cyclical maintenance.   
We have not met our legal obligations around tenant and resident safety during 2021/22 as we did not comply with gas safety legislation for 360
properties.  Due to new legislation introduced during 2021/22 regarding electrical testing and smoke detection, 6,090 properties were non-compliant
with regards to having an EICR and 735 for smoke detection.  There is still ongoing reluctance by some tenants to grant access to their property due
to their concerns about risk of COVID-19 transmission.  Additional contracts were put in place to try and achieve this by the date given, however
supply chain and labour shortages for contractors impacted the programme.  All efforts were made to ensure compliance at the earliest opportunity
and appropriate records were kept. We aim to have all EICRs and outstanding smoke detection by end of March 2023. 
Our ambitious Estate Based Regeneration Programme was approved in 2019 and makes financial provision for investment in our housing estates
over a ten-year period. This includes a tenant led budget offering a participatory budgetary approach. 
Repairs, maintenance and improvements
North Ayrshire Council is committed to delivering a high quality, efficient and effective reactive and planned maintenance service to all our tenants and
factored owners in a manner which maintains high customer satisfaction.  Our Repairs Policy sets out the service provided by the Council for repairs
and maintenance and aims to ensure the needs of our current and future tenants are met in relation to the provision of high-quality housing. The
policy was developed in consultation with tenant representatives. 
The average length of time taken to complete emergency repairs reduced from 3.45 in 2020/21 to 2.61 hours in 2021/22, and from 9.75 to 7.66 days
for non-emergency repairs.  The increase in performance is more in line with pre-pandemic figures whilst Building Services continued to comply with
COVID-19 guidance and the shortage of materials and labour. 
148

Page 149

Satisfaction levels of tenants who had repairs or maintenance carried out in the last 12 months decreased from 86.73% to 85.71% during the same
period.  This is based on responses from 98 tenants in 2021/22, which is the same amount as the previous year due to the survey process being
impacted during the pandemic.   
An efficient and effective void repairs service provides a quick turnaround on empty properties, which helps to speed the repairs process and reduce
void rent loss.  Void performance is affected by the additional time taken to rehouse tenants from our regeneration projects. The Council agreed to
demolish a number of blocks of flats and rehouse all tenants, with an enhanced package of works carried out in tenants’ new homes. A general
increase in the number of properties requiring major works such as central heating, rewiring and full decoration has also impacted on performance. 
The average time taken to re-let properties has reduced from 27.13 days in 2020/21 to 22.38 days in 2021/22, with figures returning to pre-pandemic
performance levels.  A review of the void process is ongoing to identify further improvements. 
Standard 3 – Neighbourhood and community 
Outcome: 
Estate management, antisocial behaviour, neighbour nuisance and tenancy disputes 
Estate Management covers a broad range of situations and activities such as new tenant visits, permissions for garages and driveways in garden
ground, abandoned tenancies, untidy gardens, neighbour disputes, problems with pets, abandoned vehicles, tackling graffiti and illegal dumping/fly-
tipping.  We have a comprehensive procedure manual to ensure we meet our responsibilities as landlord, and to support tenants to meet their
responsibilities detailed in their Tenancy Agreement. Every effort is made to support tenants to address breaches of tenancy, however if a tenant is
unwilling to do so, the Council will pursue appropriate legal action.   
The Safer North Ayrshire Partnership (SNAP), comprising of a range of community planning partners, works together to deliver the multi-agency
SNAP strategy which includes how we work together to tackle antisocial behaviour (ASB) and low-level crime. 
We experienced an 17% decrease in reports of ASB during 2021/22.   This was a 1.27% improvement in performance - as measured in line with the
ARC indicator - compared to the previous year.    The Council has locally agreed targets for the closure of cases, which are based on the complexity
and level of investigation required to resolve them.  Our performance against locally agreed targets is 99.3% of cases resolved within agreed
timescales, against a target of 94%. 
Our last tenant satisfaction survey saw a decrease of 12% in tenants satisfied with the management of the neighbourhood they live in compared to
the previous survey carried out in 2018. 
149

Page 150

Standard 4 – Access to housing and support 
Outcomes: 
Housing options and access to social housing
A pilot voids project commenced in January 2022, which saw mandatory void targets being replaced by timescales mutually agreed by the Housing
Officer and Building Services supervisor, based on the amount of work required. Initial reports are very positive, and performance has improved
significantly. The pilot will be rolled out across the whole of our stock and following a successful review, it is expected that the new processes will be
implemented later in 2022. 
Housing management have periodic meetings with officers from North Ayrshire Health and Social Care Partnership (NAHSCP), who manage the
process for aids and adaptations, and our Building Services team who carry out the majority of works in Council dwellings.  This allows us to monitor
performance and expenditure.  To ensure ongoing improvement and quality of service provision, Occupational Therapy (OT) assessments are
reviewed by Senior Occupational Therapists.  NAHSCP has a formal Adaptations Criteria and Policy for all staff to adhere to whilst assessing
adaptations. Joint complex case reviews are held monthly, with Partnership and Housing representation, before any complex adaptation is agreed.
OT staff have been trained to explore housing options with all services for housing applicants who have long term conditions, to ensure that accessible
housing needs are met where adaptations are not appropriate. These tiers of governance provide a formal procedure for all decision making, ensuring
resources are targeted to those most in need of adaptations.  Processes have, at times, been adapted in line with government and national policy
updates arising from COVID-19. 
There has been a decline in adaptations performance, with the number of households waiting for an adaptation to their home increasing from 12 in
2020/21 to 142 in 2021/22.  The average number of days to complete an approved adaptation has also increased from 54.79 to 74.33.  A joint
improvement group involving Housing, Building and Property Management and Investment and the Health and Social Care Partnership continues to
review this process to consider ways to achieve the best outcome for tenants. 
Homeless people
We experienced a 14% increase in homelessness during 2021/22 - this is a 4% increase on pre-pandemic homeless approaches.  The most significant
increase relates to relationship breakdown within family households. We also continue to experience high levels of homelessness as a result of
domestic violence and people being asked to leave the family home. 
In partnership with Community Planning partners, we have undertaken a significant amount of work in relation to violence against women to tackle
domestic violence. We have:
• launched a Domestic Abuse Policy for North Ayrshire Tenants and Residents
150

Page 151

• launched a staff Domestic Abuse Policy
• developed and implemented a Multi-Agency Risk Assessment Conference (MARAC) across the three Ayrshire Local Authorities and NHS
Ayrshire and Arran
• developed and implemented a safe contact initiative
• undertaken a range of work across schools in North Ayrshire to highlight and tackle gender-based violence, including coercive behaviour 
We did not lose contact with any households during 2021/22 and we experienced a 17% reduction in withdrawn applications. Whilst there has been
an increase of 35% in applications being resolved prior to assessment, we have determined that this is as a result of people returning to the family
home; the ability to do this had reduced significantly during the pandemic. The proportion of applications assessed as ‘not homeless’ has increased
by 26% and remains significantly higher than pre-pandemic levels.  Analysis has determined that, in the main, this was as a result of households
approaching the Council following a dispute with people within the wider community (74% of not homeless cases). Whilst they were deemed not
homeless following investigation, these households were provided with appropriate advice and support, enabling them to return home or source
alternative accommodation. 
We have continued to prioritise lets to homeless people during 2021/22, with 45% of all North Ayrshire Council allocations being made to this group.
This has resulted in an increase of households being housed into settled accommodation of 12%. These figures do not include allocations made to
households threatened with homelessness, who are awarded insecurity of tenure points within our allocation policy which, when added to the above,
takes the level of households resettled into a council tenancy to 47%.   
Our duration of homelessness has decreased from 28 weeks (196 days) pre-pandemic to 23 weeks (161 days) during 2021/22. Again this is as a
result of increased lets to homeless. 
We have had no breaches of the Unsuitable Accommodation Order and have ensured that temporary accommodation continues to be available for
anyone who needs it.  Our inter-agency Rapid Rehousing Transition Plan (RRTP) details our ambitious targets for allocations to homeless households
over five years, based on robust independent modelling. It also details our approach to Housing First and temporary accommodation provision. 
During 2021/22 we: 
➢ Continued with the implementation of our Housing First Plan - we now have 60 tenancies created for our most complex households;
➢ Worked with national partners, including health colleagues, to identify further opportunities to prevent homelessness across North Ayrshire;
➢ Undertook renovations to our short stay hostel, improving the quality of accommodation available;
➢ Prioritised lets to homeless households and reduced the duration of homelessness. 
Standard 5 – Getting good value from rents and service charges  
Outcomes:
151

Page 152

Value for money
Our robust Housing Revenue Account Business Plan provides clear strategic direction, ensuring that effective short, medium and long-term financial
planning is undertaken.  This clearly details how we will plan for, and deliver, key priorities such as compliance with the Scottish Housing Quality
Standard and EESSH, investment in our current stock, our Council house building programme and rent setting. 
The Business Plan was developed by a cross stakeholder working group which included representation from elected members, tenant representatives
and officers from within Housing, Property Management and Investment and Financial Services.  This approach ensured balanced decision-making
that can stand up to both internal and external scrutiny. 
The Plan provides a platform to develop an effective performance management and reporting framework that makes certain that we continue to
provide value for money services to our tenants and, at the same time, keep rents at affordable levels.  This is achieved while recognising that we are
currently operating within an ever-changing and evolving economic environment that requires the flexibility to change and adapt. 
The plan is easily accessible to stakeholders.  It provides information to demonstrate that the Council has a clear picture of its strategic direction and
the associated financial position of the service to deliver this, over the 30-year planning period.  This plan is reviewed annually, and we are focused
on providing value for money through a number of measures, such as operating robust financial management processes, implementing value for
money principles, exploring efficiency opportunities, and managing competitive contractual arrangements.   
89% of tenants felt that the rent for their property represents good value for money during our last tenant satisfaction survey. 
Rents and service charges
Our rent levels remain lower than the national average, however we continue to invest significantly in our existing stock and new house building
programme. We face challenges in, for example, changes to welfare reform, demographics and the housing stock profile. We are committed to
delivering services in new, improved and more cost-effective ways. 
Standard 6 – Other customers  
Outcomes: 
Gypsy/travellers
North Ayrshire Council provides services, advice and assistance to Gypsy/Travellers who live permanently in North Ayrshire and to those who visit
on a temporary basis.  North Ayrshire manages one permanent site at Redburn Grove, Irvine.  The site has 16 pitches, and each pitch has its own
amenity block with separate kitchen, shower, toilet facilities and utility room.  A community room is available on site for partner services to meet
tenants and their children within a safe and comfortable environment.  The room is used by several Services, including: Education, the Welfare Reform
152

Page 153

Advice team, Tenancy Support, the Community Link team and a regular GP surgery.  Our Tenant Participation Team also support Redburn Grove
tenants to hold regular tenants’ meetings. The meetings allow tenants the opportunity to work in partnership with Council staff as we consider the
options for current and future service provision. Six of the families who were digitally excluded were issued with Chromebooks and Wi-Fi access for
two years as part of the Connecting Scotland initiative. This will help these low-income households with employment support, attendance at virtual
tenant meetings, and with engagement more generally.   
In 2016 the Scottish Government introduced minimum standards for Gypsy Traveller Sites across Scotland.  North Ayrshire Council achieved the
minimum standards at Redburn Grove; however we recognise that significant capital investment is required to ensure that it continues to meet
expected standards.  Work to replace kitchens within each amenity unit was completed in June 2021.  This was the first phase of expenditure from
the Council’s £0.074m share of the Scottish Government’s £2m capital investment fund. The second phase of the project included the installation of
gates to every pitch, door replacement in the amenity units and the resurfacing of pitches. These projects were highlighted by the tenants as their
priority for improvements on the site. 
The Scottish Government has developed a draft design guide for Gypsy/Traveller sites to be used for new sites or major refurbishments of existing
sites.  The design guide has been provided to give advice on what good quality, culturally appropriate accommodation should look like.  The Scottish
Government have also made available a new capital fund to run for five years from 2021-25. In October 2020, Scottish Government/COSLA sought
views on likely future investment needs over the next five years. NAC responded that approximately £2.5m funding would be required in year three
for Redburn Grove. The Scottish Government has outlined the criteria for the fund, including how residents and travelling community members must
be involved, together with a process for project selection. Future improvement proposals for the Redburn site will follow on the completion of our
engagement with current tenants, to confirm their preferences for future housing. 
Our response to unauthorised encampments is consistent and in line with the policy issued by the Scottish Government.  Our Gypsy/Traveller
Encampment Officer works to build relationships with visiting families to assess their needs.  Where necessary they make referrals to partner
organisations and provide advice on housing options, if required. The Officer also works closely with other landowners and members of the settled
community and provides advice and assistance regarding the rights and responsibilities of Gypsy/Travellers who visit North Ayrshire. 
Refugees
In 2015, North Ayrshire Council pledged a commitment to participate in the UK Government’s Syrian Resettlement Programme. The Council agreed
to resettle 160 vulnerable Syrian refugees over a four-year period and to coordinate the programme, a Refugee Support Team was introduced to
deliver the required objectives. This service, along with input from Community Planning Partners such as the Health and Social Care Partnership,
Education, Department of Work and Pensions, Police Scotland and voluntary organisations, delivers robust resettlement packages to assist families
to integrate into the local area and access vital services to meet their individual needs. The Council has fully participated in the Syrian Resettlement
Programme and, due to meeting its initial target numbers earlier than expected, increased its pledge on two further occasions, taking the overall total
to 211 refugees (43 families). 
The Council agreed to continue its humanitarian commitment and to participate in a new global resettlement programme, with the aim of resettling a
further 30 refugees throughout 2020/21. This was paused due to COVID-19 restrictions on movement both overseas and in the UK. The programme
recommenced; however, plans to resettle the 30 refugees by March 2022 have been interrupted by our response to the conflict in Ukraine.
153

Page 154

We have also provided support for families fleeing the conflict in Afghanistan, following the withdrawal of American and NATO forces in August 2021.
We will continue to support these resettlement programmes and add to the 36 Afghan nationals (8 families) who have already arrived. 
More recently, the Council has responded to the humanitarian crisis created as a result of the conflict in Ukraine. We have pledged a significant
number of Council properties to be used to provide accommodation for people fleeing the conflict. We are also providing support, advice, and
assistance to those who have settled within the homes of North Ayrshire residents. We have set up a Welcome Hub within a local hotel to provide
interim emergency accommodation and support to individuals and families while they await a more appropriate housing option. We will continue to
monitor the situation in Ukraine and will increase our pledge of assistance, should that be required. 
154