Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Tuesday, 31 May 2022 at 10:00 to consider the undernoted business. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 External Audit Report on Audit Dimensions and Best Value for the
year ended 31 March 2022
Submit report by Head of Service (Finance) on the findings from the
External Audit report on Audit Dimensions and Best Value for 2021/22
(copy enclosed). 
3 Accounts Commission’s Report: Local Government in Scotland:
Financial Overview 2020/21
Submit report by the Head of Service (Finance) on the findings of the
recently published Accounts Commission report (copy enclosed). 
4 Internal Audit Annual Report 2021/22
Submit report by the Head of Service (Finance) on the work of Internal
Audit during 2021/22 and providing an opinion on the governance, risk
management and internal control environment of the Council (copy
enclosed). 
5 Annual Governance Statement 2021-22 
Submit a report by the Head of Service (Finance) on the Council’s Annual
Governance Statement for 2021-22 for inclusion within the draft Annual
Accounts (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
6 Accounting Policies 2021/22
Submit report by the Head of Service (Finance) on the accounting
policies which will be adopted in the preparation of the Council’s Annual
Accounts for the year to 31 March 2022 (copy enclosed). 
7 Corporate Fraud Team Annual Report 2021/22
Submit report by the Head of Service (Finance) on the work of the
Corporate Fraud Team during 2021/22 (copy enclosed). 
8 Internal Audit and Corporate Fraud Action Plans: Quarter 4 Update
Submit report by Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 31 March 2022 (copy enclosed). 
9 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between March and April 2022 (copy enclosed). 
10  Participatory Budgeting
Submit report by the Executive Director (Communities and Education)
providing an update on engagement methods used in Participatory
Budgeting events (copy enclosed). 
11  Urgent Items
Any other items which the Chair considers to be urgent. 
12  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 19 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
13  Investigation Reports Issued
Submit report by the Head of Service (Finance) on investigation reports
finalised since the last meeting (copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed for live and subsequent broadcast
via the Council’s internet site.  At the start of the meeting, the Chair will
confirm if all or part of the meeting is being live-streamed/webcast.  
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the live-stream/webcast will be
retained in accordance with the Council’s published policy, including, but
not limited to, for the purpose of keeping historical records and making
those records available via the Council’s internet site.   
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers and using the press or public seating
area, you are consenting to being filmed and consenting to the use and
storage of those images and sound recordings and any information
pertaining to you contained in them for webcasting or training purposes
and for the purpose of keeping historical records and making those records
available to the public. If you do not wish to participate in a recording, you
should leave the meeting at this point.  This will constitute your revocation
of consent.   
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Ian Murdoch
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    External Audit Report on Audit Dimensions and Best Value
for the year ended 31 March 2022 
Purpose:  To inform the Committee of the findings from the External Audit
report on Audit Dimensions and Best Value for 2021/22 
Recommendation:  That the Audit and Scrutiny Committee: 
(a) notes the findings contained in the external auditor’s Audit
Dimensions and Best Value report;
(b) notes the Sector Developments as outlined in the report;
and 
(c) considers the verbal Interim Report by the external auditor. 
1. Executive Summary 
1.1 Deloitte LLP has been designated as the Council's external auditors for the six year
period 2016-2022. 2021/22 is the final year of this appointment. 
1.2  This report on the Audit Dimensions and Best Value provides the Audit and Scrutiny
Committee with the external auditor’s findings across the four audit dimensions, within
the scope of the 2021/22 audit work, and the review of the arrangements made by the
Council for securing Best Value. 
1.3  The overall conclusions of the report state that the Council : 
• continues to have robust budget setting and monitoring arrangements in place;
• is financially sustainable in the short term;
• faces significant financial challenges over the medium and longer term;
• continues to have strong leadership and robust governance arrangements;
• has a clear and robust performance management framework; and
• has robust arrangements in place to secure Best Value. 
1.4  The unaudited accounts for 2021/22 are due to be presented to Council in June 2022
and to the Council's external auditors, Deloitte LLP, for audit. The external audit
Annual Report will be presented to the Audit and Scrutiny Committee in September
2022. 
Agenda Item 2
5

Page 6

2. Background 
2.1 Deloitte LLP has been designated as the Council's external auditors for the six year
period 2016-2022. Deloitte LLP has also been appointed as the auditors for the North
Ayrshire Integration Joint Board. 2021/22 is the final year of this appointment. 
2.2  A report on the Audit Dimensions and Best Value for 2021/22 has been prepared by
the external auditors and is included in appendix 1. This report provides the Audit and
Scrutiny Committee with the external audit findings across the four audit dimensions
within the scope of the 2020/21 audit work. They include: 
• Financial Management;
• Financial Sustainability;
• Governance and Transparency;
• Value for Money 
2.3  The report also incorporates a review of the arrangements made by the Council for
securing Best Value, including an update on the progress made against the
recommendations contained within the Best Value Assurance Report presented to
Council on 23 September 2020. 
2.4  In addition, the report examines North Ayrshire Council’s preparedness in relation to
the identified emerging issue of Climate Change and highlights the recently published
Audit Scotland report, Addressing Climate Change in Scotland, which sets out the key
improvements required to reach the Scottish public sector’s climate change ambitions. 
2.6  A summary of the key conclusions from the report include: 
Financial Management
The Council continues to have robust budget setting and monitoring arrangements in
place This is supported by an experienced finance team and a robust internal audit
function, as well as appropriate arrangements for the prevention and detection of fraud
and error. 
Financial Sustainability
The Council has set a balanced budget for 2022/23 and holds unearmarked reserves
at a level consistent with its Reserves Strategy, therefore is financially sustainable in
the short term. However, it continues to be faced with significant financial challenges
over the medium and longer term, projecting a funding gap of £19.514m over the next
two years, and a gap of £120m over a ten year period. 
It is positive to see the work progressing with the sustainable Change Programme,
with a comprehensive benefits tracker, and the commitment to invest in recovery and
renewal, however, progress continues to be impacted by the pandemic. It is critical
that this work is progressed at pace and scale to ensure that the planned benefits
(both financial and environmental) are realised. 
6

Page 7

Governance and Transparency
The Council continues to have strong leadership, which has been enhanced in the
year with the creation of additional capacity at Head of Service to focus on priorities.
The governance arrangements also continue to be robust with a comprehensive
review of the infrastructure to enable hybrid meetings and an effective Audit and
Scrutiny Committee. The Council continues to be open and transparent and
demonstrates a culture of continuous improvement, with the planned development of
the Participation Strategy. 
Value for Money
The Council continues to have a clear and robust performance management
framework in place which has been enhanced in the year with the Performance
Management Strategy and new Performance Dashboard. It has continued to report its
performance against the priorities within the Council Plan and also against the LGBF,
with clear actions in place to address indicators that are adrift of target. 
The Council also continues to have robust arrangements in place to comply with the
SPI Direction, including its public performance reporting requirements. 
Best Value
The Council has robust arrangements in place to secure best value and has a clear
understanding of areas which require further development. 
2.7  The unaudited accounts for 2021/22 are due to be presented to Council in June 2022
and to the Council's external auditors, Deloitte LLP, for audit. The external audit
Annual Report will be presented to the Audit and Scrutiny Committee in September
2022. 
3. Proposals 
3.1 It is proposed that the Audit and Scrutiny Committee: 
(a) notes the findings contained in the external auditor’s Audit Dimensions and Best
Value report;
(b) notes the Sector Developments as outlined in the report; and 
(c) considers the verbal Interim Report by the external auditor. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None.
7

Page 8

Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Deloitte LLP consulted with the Head of Service (Finance) in preparing their report 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
None
8

Page 9

Report to the Audit and Scrutiny Committee
on the ‘Audit Dimensions and Best Value’ for the year ended 31 March 2022
North Ayrshire Council
Issued on 13 May for the meeting on 31 May 2022 9

Page 10

2
Contents
01 Our report 02 Sector developments
Key messages 3
Audit dimensions and best value
Overview 5
Financial management 6
Financial sustainability 9
Governance and transparency 17
Value for money 20
Best value 24
Emerging issues – climate change 28
Purpose of our report and
responsibility statement 31
Local government in Scotland 33
The future of infrastructure: A survey
of infrastructure trends 35
10

Page 11

3
Financial management
The Council continues to have robust budget setting and
monitoring arrangements in place. This is supported by an
experienced finance team and a robust internal audit function,
as well as appropriate arrangements for the prevention and
detectionof fraudanderror.
Financial sustainability
The Council has set a balanced budget for 2022/23 and holds
unearmarked reserves at a level consistent with its Reserves
Strategy, therefore is financially sustainable in the short term.
However, it continues to be faced with significant financial
challenges over themedium andlonger-term.
It is positive to see the work progressing with the sustainable
Change Programme, incorporating a comprehensive benefits
tracker and a clear commitment to invest in recovery and
renewal. However, progress continues to be impacted by the
pandemic. It is critical that this work is progressed at pace and
scale to ensurethattheplannedbenefitsare realised.
Governance and transparency
The Council continues to have strong leadership, which has
been enhanced in the year with the creation of additional
capacity at Head of Service to focus on priorities. The
governance arrangements also continue to be robust, with a
comprehensive review of the infrastructure to enable hybrid
meetings and an effective Audit and Scrutiny Committee. The
Council continues to be open and transparent and demonstrates
a culture of continuous improvement, with the planned
developmentof a ParticipationStrategy.
Value for money
The Council continues to have a clear and robust performance
management framework in place which has been enhanced in
the year with the Performance Management Strategy and new
Performance Dashboard. It has continued to report its
performance against the priorities within the Council Plan and
also against the Local Government Benchmarking Framework
(LGBF) with clear actions in place to address indicators that are
adriftof target.
Key messages
As set out in our audit plan, the Code of Audit Practice sets out four audit dimensions which set a common framework for all public
sector audits in Scotland. Our audit work has considered how the Council is addressing these and our conclusions are set out within
this report.
Our responsibilities in relation to the Accounts Commission’s Strategic Audit Priorities (‘SAP’), the Statutory Performance
Information(‘SPI’) DirectionandBest Value (‘BV’)have all beenincorporatedintothis auditwork.
Best value - The Council has robust arrangements in place to secure best value and has a clear understanding of areas which
require further development.
11

Page 12

4
Added value
Our aim is to add value to the Council by providing insight into,
and offering foresight on, financial sustainability, risk and
performance by identifying areas for improvement and
recommending and encouraging good practice. In so doing, we
aim to help the Council promote improved standards of
governance, better management and decision making, and
more effectiveuse of resources.
This is provided throughout the report. In particular, we have
highlighted some specific areas to consider in relation to climate
change on pages 28-30 given the importance and urgency of
addressing this. We have also included our “sector
developments” on pages 33 to 35 where we have shared Audit
Scotland’s national reporting and our research and informed
perspective and best practice from our work across the wider
publicsector thatare specifically relevantto theCouncil.
Key messages (continued)
Pat Kenny
Audit Director
12

Page 13

55
Audit Dimensions and Best Value
Overview
This report is structured in accordance with the four audit dimensions, but also covers our specific audit requirements on Best Value,
theAccounts Commission’s StrategicAudit Priorities(SAPs) andtheStatutoryPerformanceInformation Direction.
In recognition of the demands on auditors’ time and the challenges of remote auditing, the Accounts Commission agreed that auditors
are not required to specifically consider and report on the SAPs as part of the 2021/22 audit. The SAPs continue to be important but
the work on the audit dimensions will be used to inform progress. We have therefore set out below how each SAP inter-relates to the
auditdimensions.
Financial
management
Financial
sustainability
The strategic appraisal of
options for reshape
services in line with
priorities. This should
consider good practice,
innovation and
collaborative working with
partners
Ensuring that members and
officers have the right
knowledge, skills and
support to design, develop
and deliver effective
services in the future
Governance and
transparency
Having clear priorities with
a focus on outcomes,
supported by effective
leadership and long-term
planning
Empowering local
communities and involving
them in the design and
delivery of local services
and planning for their local
area
Value for money
Reporting the council’s
performance in a way that
enhances accountability to
citizens and communities,
helping them contribute
better to the delivery of
improved outcomes
Statutory Performance
Indicators
Audit
dimension
Strategic
Audit
Priorities
Best Value
Other
requirements
13

Page 14

6
Is financial
management
effective?
Are budget setting and
monitoring processes
operating effectively?
Is there sufficient
financial capacity?
Financial Management
Significant risksidentified in Audit Plan
In previous years we have concluded that the Council had strong financial management arrangements
in place and a sufficiently qualified and experienced finance team. We therefore did not identify any
significant risks in relation to financial management during our planning. We have continued to review
thearrangementsin place as summarised on thefollowing pages.
Current year financial performance
The 2021/22 General Fund budget of £365.296m was approved by the Council on 4 March 2021. This
included use of unearmarked reserves of £0.862m which were released following a review of
corporate contingency funding. It has been updated throughout the year to include in-year
movements and the latest projected position is a net underspend of £1.208m (0.3%) after carrying
forward funds of £2.455m, i.e. a gross underspend of £3.663m. The Executive Leadership Team and
Councillors regularly review progress against budget throughout the year, with quarterly reporting to
the Cabinet for both revenue and capital expenditure. From review of the reporting throughout the
year, variances are clearlyreportedandexplained.
The main underspend has arisen in the Communities service, which has reported a £1.750m
underspend in the year which is largely in Early Years Education due to the revised programme for full
implementationof the expansionto 1140 hourswhich now expandsinto2022/23.
The budget incorporated planned savings of £2.842m, with the majority of these on target to be
delivered by 31 March 2022. The exception is the planned reduction in external residential placements
for children which have been impacted by the pandemic, along with other minor shortfalls in planned
savings resulted from the impact of the pandemic. These delayed savings have been offset by other
underspendsacross theservices.
As part of its ongoing monitoring, the Council has continued to identify a risk to the financial position
presentedbythe uncertaintyaroundtheprogress of, andrecoveryfrom, theCOVID-19 pandemic.
Financial management
14

Page 15

7
Current year financial performance (continued)
The 2021/22 Housing Revenue Account (HRA) budget, agreed
by the Council on 16 December 2020, is projecting an
underspend of £3.298m. This has been consistently reported to
members throughout the year as part of the normal reporting
cycle. The primary reason for the underspend is due to a review
of the profiling of a £2.5m contribution towards the £5m
sustainability and regeneration programme, resulting in an
underspendin propertycosts in the year.
The Council has an ambitious long-term 10-year investment
programme, as discussed further on page 12. Progress against
this planis reportedregularlyto Cabinet.
A summary of the original and revised budgets for the general
services and HRA capital investment programmes (“CIP”) for
2021/22 is providedin the tablebelow.
As can been seen from the above table, the significant changes
from the original budgets are due to having to re-profile a
significant portion of capital projects to future years due to the
COVID-19 restrictionsimpactingon theconstructionindustry.
The Council has recognised that the major risk for the capital
programme remains the uncertainty around the impact of the
COVID-19 pandemic and the EU withdrawal on contractors and
the cost of materials. Any significant increase in cost during the
tendering phase will have a negative impact on the deliverability
of both the General Fund and HRA capital programme for
2021/22 andbeyond.
In setting its 2021/22 budget, the Council highlighted the
continued engagement with the Convention of Scottish Local
Authorities (COSLA) and the Scottish Government around
additional support measures, including a range of financial
flexibilities, which may be applied to address the financial
impact of the pandemic. It concluded that, at the time of
approving the budget, the benefits to the Council were limited
but agreed to continue to monitor and approved the use of such
flexibility to meet COVID-19 related pressures should the need
arise through2021/22. No such needhas arisen during2021/22.
Finance capacity
The finance team has remained consistent throughout the year.
Whilst COVID-19 has created additional work for the team,
including the additional reporting requirements to the Scottish
Government and administering of the business support grants,
this is beingwell managed.
Financial management (continued)
General Services
(£’000)
HRA
(£’000)
Original budget 77,762 109,756
Changes to funding 7,000
Other revisions 13,070 - 2,006
Rephasing of projects (47,073) (64,324)
Revised budget 50,759 43,426
15

Page 16

8
Internal audit
We have assessed the internal audit function, including its
nature, organisational status and activities performed. We have
also carried out a review of the internal audit reports published
throughout 2021/22. The conclusions have helped inform our
audit work, although no specific reliance has been placed on
thiswork.
The 2021/22 Internal Audit Plan was approved by the Audit and
Scrutiny Committee in January 2021. Due to the impact of the
pandemic on the delivery of the 2020/21 audit plan, the
2021/22 plan covered the slightly extended period from
February2021 to March2022.
A mid-year update was provided to the Audit and Scrutiny
Committee in November 2021, with a number of changes
agreed due to a reduction in the number of available audit days
mainly as a result of a gap in resourcing and continuing to avoid
some audits which require physical site visits. As a result of this,
the Committee approved the deferral of seven internal audits to
2022/23. The deferred audits were lower risk areas therefore
notconsidereda significantrisk to theoverall auditopinion.
Good progress has been made in implementing internal audit
recommendations, with the most recent progress report
showing that of the 57 actions, 34 have been completed, 19 are
notyet due,leaving4 thathavenot started.
We will consider the work of internal audit as part of our audit
work on the Annual Governance Statement and report our
conclusions in our final report to the Audit and Scrutiny
Committee in September2022.
Standards of conduct for prevention and detection of fraud
and error
We have assessed the Council’s arrangements for the prevention
and detection of fraud and irregularities. This has included
specific considerations in response to the increased risk of fraud
as a result of COVID-19. Overall we found the Council’s
arrangementsto be designedandimplementedappropriately.
National Fraud Initiative (NFI)
All councils are participating in the most recent NFI exercise
which commenced in 2020/21. We have continued to monitor
the council’s participation and progress in the NFI during
2021/22 and submitted an assessment of the Council’s
participation to Audit Scotland in February 2022. The
information submitted will be used by Audit Scotland in its next
national NFI report which is due to be published in the summer
of 2022. We concluded that the Council was fully engaged in the
exercise.
Financial management (continued)
Deloitte view – financial management
The Council continues to have robust budget setting and
monitoring arrangements in place. This is supported by
an experienced finance team and a robust internal audit
function, as well as appropriate arrangements for the
preventionanddetection of fraudanderror.
16

Page 17

9
Significant risksidentified in Audit Plan
While the Council has historically achieved short term financial balance, there remains a risk that
robust medium-to-long term planning arrangements are not in place to ensure that the Council can
manage its finances sustainably and deliver services effectively. We have therefore considered the
2022/23 budget setting process and the work being done over the medium and longer-term including
thesustainablechange programme andrecovery andrenewalas summarised on thefollowing pages.
2022/23 budget setting
The Council approved a balanced budget of £380.710m for 2022/23 on 2 March 2022. This
incorporated an initial budget gap of £31,500 for which a detailed savings plan have been developed.
This is in addition to the savings of £3.087m previously approved. The 2022/23 budget assumes no
drawon unearmarkedreserves,an increase incore grantfundinganda 3% increase in Council Tax.
In setting its budget, the Council recognises that its financial framework is underpinned by strategic,
operational and project risk registers. The following key risks have been identified that are associated
with securing financialsustainability.
• FinancialEnvironment– fundingnot keepingpace with cost of service delivery;
• FinancialSustainabilityof theHealth andSocial Care Partnership(HSCP); and
• Deliveryof sustainablechange programme/transformation– to addressprojectedbudgetdeficit.
The Council, via COSLA, continues to have dialogue with Scottish Government across a range of areas
including fair funding, multi-year financial settlements, financial flexibility and the levels of funding
ring-fenced to meet policy commitments. It recognises that the delivery of financial savings through
a change and transformation programme, including the use of investment in “net zero” projects, is a
more sustainableapproachin addressingthefinancialchallenges in themediumandlong-term.
Financial sustainability
Can short term (current
and next year) financial
balance be achieved?
Is there a long-term (5-
10 years) financial
strategy?
Is investment effective?
Financial Sustainability
17

Page 18

10
2022/23 budget setting (continued)
Elected members were fully involved in the budget process in
advance of the formal budget setting meeting. This included
comprehensive budget sessions in November 2021 and
February 2022 with all elected members. As part of these
sessions, members were taken through the key planning
assumptions, the financial gaps and the options available to
close the gaps. The sessions not only covered the 2021/22
position, but also looked to the medium-term to 2024/25 and
considered the corresponding workforce and capital programme
implications.
The Council also carried out virtual community engagement
sessions on 20 January 2022 and 27 January 2022 with all
localities represented. Feedback from these sessions continue
to help inform the budget process and influence investment
proposals.
Reserves
At the time of approval of the 2022/23 budget on 2 March
2022, the Council carried out its annual review of its Reserve
and Fund Balances in line with good practice. This took into
account known commitments, potential liabilities and the risk
profile of the Council to provide flexibility to deal with
unforeseencircumstances.
The projected reserves position at 31 March 2022 is illustrated
below:
The unearmarked general fund reserve is projected to remain
consistent with 2021/22 at £11.315m. This represents 2.9% of
budgeted net expenditure and is in line with the Council’s
Reserves Strategy, albeit towards the lower end of the
recommended rangeof between 2 and4%.
Financial sustainability (continued)
0
20
40
60
80
100
120
Reserves balance (£m)
Capital and Other
Reserves
HRA Earmarked Reserve
HRA Unearmarked
Reserves
General Fund Earmarked
Reserves
General Fund
Unearmarked Reserves
18

Page 19

11
Reserves (continued)
The overall reserves position is projecting to continue to
increase from the 2020/21 position, however, the majority of
this is earmarked forspecific purposes,in particular:
• Project specific funds (£28.820m) – these will be carried
forward from 2021/22 to allow completion of specific
projects. This includes the sum of £2.476m to help mitigate
thelegacy financialimpact of thepandemic.
• Prudential Investment Fund (£7.307m) – these are resources
to smooth the revenue implications of loan charges
supportingthe CapitalInvestmentProgramme.
• Renewal Fund (£13.594m) – these are to support a range of
projects across key themes identified through the experience
from the pandemic.
• Investment Fund (£8.488m) – these are to support a number
of sustainability, infrastructure and Community Wealth
Buildingprojects.
Capital planning and treasurymanagement
The Council updates its 10-year Capital Investment Programme
(CIP) on an annual basis as part of its budget setting process. At
the same time, it refreshed its Treasury Management and
Investment Strategy. The latest long-term capital programme
covers thelong-termperiodof 2022/23 to 2030/31.
The graph below illustrates the projected CIP over the next 10
years, which again shows that the Council continues to have an
ambitious capital programme, particularly in the first 3 years of
theprogramme which totals£289m.
A total of £47m of planned expenditure from 2021/22 has been
re-profiled into 2022/23 to 2030/31 in line with updated project
delivery timelines (as discussed further on page 7). In addition,
to manage the risks associated with the consequences of the
pandemic referred to on page 77, specifically increased
contractor and material costs, an additional £10m investment
has been includedwithin thebudgetoverthenext fouryears.
.
Financial sustainability (continued)
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Capital Investment Programme (£'000)
19

Page 20

12
Capital planning and treasury management (continued)
The next major review of the capital programme is planned for
2023/24. The longer-term affordability of the current and future
programme requires incremental increases to the current
General Fund financing budget which has been included in the
indicative budgets for 2022/23 to 2025/26. As part of the
planned major review, the Council plans to review the available
financing budgets with a view to increasing the available
fundingto maintainthese programmes.
The HRA capital programme is also updated annually as part of
the annual report of the HRA Business Plan. In February 2022,
the Council approved £114.507m HRA capital expenditure for
2022/23 anda further£98.259m for futureyears.
Similar to the CIP, the 2021/22 HRA capital programme has
experienced delays due to the COVID-19 restrictions on the
construction industry. The 2022/23 programme has been
updated to reflect these delays. The Council and its Registered
Social Landlord (RSL) partners have been monitoring the impact
of both COVID-19 and Brexit on the Strategic Housing
Investment Plan and has reported that there is clear evidence of
both time and financial impacts due to national labour and
material shortages and an increase in material costs. A total of
1,625 new homes are targeted for completion by the Council by
31 March 2027, of which 632 were completed at 20 January
2022, with the total expected to increase to 695 by 31 March
2022.
Medium-to-long term financial planning
As reported in our 2020/21 audit report, the Council updated its
Long-Term Financial Outlook (LTFO) in December 2020, covering
the period 2021/22 to 2030/31. This establishes a sound basis
for the development of the Medium-Term Financial Outlook and
subsequent annual budgets. It identified a funding shortfall of
£120m over the next 10 years. This compared favourably to the
shortfall identified in the previous LTFO published in 2017,
where a gap of £156m over a 10-year period was identified, but
stillremains a significantchallenge.
Financial sustainability (continued)
0%
1%
2%
3%
4%
0
5
10
15
21/22 22/23 23/24 24/25 25/26 26/27 27/28 28/29 29/30 30/31
Long-Term Financial Outlook 2021 - 2031
Annual Gap £m % of Expenditure
20

Page 21

13
Medium-to-long term financial planning (continued)
The Medium-Term Financial Plan (MTFP), as updated in
February 2022 for the period 2022/23 to 2024/25, draws on the
same data and projections, with the exception being that the
2022/23 funding position was known at the time of drafting the
MTFP. This includes further one-off funding of £120m being
announced by the Scottish Government on 27 January 2022.
Based on current planning assumptions around financial
pressures, Scottish Government funding levels and Council tax
funding, this identified a gross funding gap of £38.998m over
thenext 3 years.
In setting its 2022/23 budget in March 2022, proposals were
included for future years in relation to the MTFP, resulting in a
balanced budget being set for 2022/23 and a remaining gap of
£10.729m and £8.785m for 2023/24 and 2024/25 respectively.
No specific plans have been defined yet to bridge the funding
gaps for 2023/24 and 2024/25. This is an increasing medium-
term gap when compared with that estimated as part of the
2021/22 budgetsettingprocess, as illustratedbelow.
We have considered the updated assumptions used, which have
resulted in the increased gap for 2023/24 to 2024/25 and
concluded they are reasonable and based on available data,
including:
• Rising inflation
• PredictedInterestRate Rise
• Higher Taxes
• The Scottish Landscape
In the updated MTFP, the Council has recognised that the
ongoing pandemic has resulted in significant costs to all local
authorities during 2020/21 and 2021/22. Through a
combination of financial recovery planning and funding support
from the Scottish Government, this position has been managed
within the overall resources available and has also supported
investment into recovery and renewal activities. The majority of
funding from Scottish Government ceases in 2021/22, however,
legacy financial pressures remain across a number of areas
including waste services, commercial and general income,
facilities management and North Ayrshire Leisure Ltd. The
Council has retained earmarked funds to help mitigate the
impact of these pressures, as summarised on page 11, however,
it is anticipatedthefundswill be utilisedby2023/24.
Financial sustainability (continued)
-
5,000
10,000
15,000
Year 2 Year 3
MTFP - Funding Gap (£'000)
2021/22 funding gap 2022/23 funding gap 21

Page 22

14
Sustainable change programme
The Council has reported that progress continues to be made in developing
its Sustainable Change Programme (SCP), aligned to the Council priorities
and the Council Transformation themes, and set within the context of the
Council Plan and Community Wealth Building Strategy. It has, however,
recognised that progress has been impacted by the pandemic, but is clear
that it remains vital that change is delivered at pace and scale to support
both the budget and the Community Wealth Building ambitions over the
mediumandlonger-termandto helpreduceimpact on communities.
The objective is to develop a pipeline of projects that will deliver improved
outcomes, meet the Council’s environmental ambitions, and deliver
financial efficiencies to help address the projected funding gaps over the
short,medium andlonger-term.
To support the delivery of the SCP, a revised governance framework is in
place, and includes programme development and monitoring through the
Council’s Transformation Board and Executive Leadership team. The current
projects, each of which has a Project Board and Project Team, is illustrated
opposite.
Each project is aligned to one of the following key themes, with digital
being an enabler across each of the themes:
• Sustainability
• Land and Property Assets
• Children, Young People and Communities
• Caring for People
• Transport and Travel
Financial sustainability (continued)
Transformation
Board/
Executive
Leadership
Team
Accessing our Council
Our Future Working
Environment
Transport and Travel
Commercial Property
Renewable Energy
Non-Commercial Land and
Property
22

Page 23

15
Sustainable change programme (continued)
A new monitoring framework has been developed to track
progress across the medium-to-longer term. The impact on how
each project addresses the anticipated budget gap is reflected
in the framework, as well as the workforce implications for
delivery, the full-time equivalent impact of any anticipated
savings andtheanticipatedkey outcomes.
The latest monitoring to the Transformation Board
demonstrates that the new monitoring framework is now being
used, with each project having a separate tracker to monitor key
information as summarized below, albeit a number of the
projects do notyet have estimated financialdata.
Recovery and Renewal Investment
Another key enabler to support the budget challenges that the
Council faces is from the use of investment, most notably
through the Council’s Investment Fund and Recovery and
Renewal Investment Programme. With total resources of over
£25m set aside, a key focus of this investment is to support
sustainability projects as part of the Council’s journey towards
net zero. In addition to the clear environmental benefits,
financial efficiencies through energy savings and returns on
investment will accrue to help address the financial challenges
over themedium-term.
The Cabinet has approved a range of investment proposals,
including:
• Shewalton Solar Photovoltaic Farm Development - £5.280m.
• Community Investment Fund - £3.000m.
• Levelling up Fund – 10% match – Transport B714 - £2.370m.
As a result of this investment, the UK Government has
confined an award of £23.693m to support this project,
subject to approvalof a fullbusiness care.
Financial sustainability (continued)
Benefits Tracker - content
High level project scope Key outcomes
Progress and achievement Upcoming milestones
Items for escalation Key risks and issues
Local authority research Strategic alignment
Whole system toolkit Financials (savings,
investment, cost avoidance)
23

Page 24

16
Workforce planning
The Best Value Assurance Report in 2020 concluded that the
Council had a coordinated approach to workforce planning and
was developing workforce plans to support transformational
change.
In our 2020/21 audit we highlighted the positive work that the
Council was doing to consider the impact COVID-19 has had on
theworkforce via theFutureWorkingEnvironmentproject.
Workforce planning discussions have recommenced in 2021 and
have been updated at six monthly intervals for the majority of
services. These meetings ensure that workforce planning is
aligned with challenges, service reviews and the transformation
agenda
.
Financial sustainability (continued)
Deloitte view – Financial sustainability
The Council has set a balanced budget for 2022/23 and holds
unearmarked reserves at a level consistent with its Reserves
Strategy, therefore is financially sustainable in the short term.
However, it continues to be faced with significant financial
challenges over the medium and longer-term, projecting a
funding gap of £19.514m over the next two years, and a gap
of £120m overa tenyear period.
It is positive to see the work progressing with the sustainable
Change Programme, with a comprehensive benefits tracker,
and the commitment to invest in recovery and renewal,
however, progress continues to be impacted by the
pandemic. It is critical that this work is progressed at pace
and scale to ensure that the planned benefits (both financial
andenvironmental)arerealised.
24

Page 25

17
Significant risksidentified in Audit Plan
In previous years we have concluded that the Council has strong leadership, and that the governance
arrangements continued to work effectively. We therefore did not identify any significant risks in
relation to governance and transparency during our planning. We have, however, continued to review
thework of theCouncil andits Committees, as summarised on the followingpages.
Leadership
The Executive Leadership Team has remained largely consistent with previous years, and has
continued to demonstrate strong leadership, working closely with partners. There continues to be a
positive andcollaborativeculture.
In our 2020/21 report we highlighted that the Council appointed a Head of Service (Recovery and
Renewal) in May 2020 for a period of 18 months in recognition of the significant work required in the
recovery and renewal stage of the COVID-19 pandemic. As the recovery period is essentially complete
and renewal focus is now embedded within the Council’s sustainable change agenda, this post has
beenremoved.
In December 2021, the Staffing and Recruitment Committee approved changes to the Chief Officer
structure. The Council has recognised the need for additional capacity at a senior level to ensure focus
on delivery in relation to climate change and sustainability. In addition, the pandemic has placed
additional pressures upon the local economy and the Council’s response. The key changes are as
follows:
• The teams within Recovery and Renewal (namely Risk Management and Transformation) will align
undertheHead of Service (Finance) portfolio.
• An additional permanent Head of Service post has been created within the Place Directorate, given
the increased focus on priorities on climate change, sustainability projects and Council’s use of land
andpropertyassets.
Governance and transparency
Is governance effective?
Is there effective
leadership?
Is decision making
transparent?
Is there transparent
reporting of financial
and performance
information?
Governance and
transparency
25

Page 26

18
Governance and scrutinyarrangements
We have reviewed meetings attendance from the past year and
confirm that there has been good attendance. In addition, from
attendance at meetings we can confirm that there is sufficient
scrutiny and challenge exercised by members during the
meetings.
As a result of COVID-19 and associated restrictions, meetings of
the Council and its committees have taken place on a wholly
remote basis via MS Teams since June 2020. Live streaming of
meetings ordinarily open to the public was introduced in
October 2020.
The Council has installed hybrid meeting equipment in the
Council Chamber to allow a combination of physical and remote
attendance and has piloted this during October and November
2021. The pilot was then paused whilst the implications of the
Omicron variant of COVID-19 was fully understood. The pilot
has since resumed in February 2022 and the Council expect that
meetings will revert to a physical format, along with the
provision of hybrid facilities for those who wish to access
remotely, with the start of the new Administration, guidance
and risk assessment permitting. A number of learning points
have been taken from the initial pilot in relation to reliability,
room temperature, confidentiality, staffing resource,
participationbyexternalpartiesandaddedvalue.
The Audit and Scrutiny Committee continues to be a key
element of the governance arrangements in place. Each year, it
now undertakes a self evaluation of its performance, which has
become a standard procedure following our recommendations.
The outcome of the 2021 self evaluation, which is consistent
with our understanding, was reported to the Committee in
September 2021 which concluded that it was performing as
expected in the majority of areas, with special strengths
identifiedas:
• A full induction programme is in place for new members, and
additional training is provided as part of the wider training
anddevelopmentprogramme of members;
• Attendance levels since the start of the current
Administrationrangefrom 71-94%; and
• Positive and constructive relationship with officers of the
Council andexternalauditors.
The development of an annual programme of scrutiny and
review work has been identified as an area for focus and
included as an improvement action by the Committee and will
be taken forward as part of the Committees work during
2022/23.
The Audit and Scrutiny Committee provide oversight and
scrutiny of the Strategic Risks through a mid-year update, which
was reportedto the Committeein November2021.
Governance and transparency
26

Page 27

19
Following the public pound
The statutory requirements to comply with the Following the
Public Pound Code, in conjunction with the wider statutory duty
to ensure Best Value, means that Councils should have
appropriate arrangements to approve, monitor and hold third
partiesaccountableforpublicfundingprovidedto them.
Within the Internal Audit plan there is specific time set aside to
review “Following the public pound”’ during the year as part of
thework performed.Thisincludes:
• an annual audit of Community Councils accounts' to ensure
Council funding is used in accordance with the Council's
Scheme of Administration;and
• an annual audit of the accounts of various Tenants and
Residents Associations.
We are therefore satisfied that the Council has appropriate
arrangements in place to comply with the Following the Public
PoundCode.
Governance and transparency
Deloitte view – Governance and transparency
The Council continues to have strong leadership, which has been enhanced in the year with the creation of additional capacity at
Head of Service to focus on priorities. The governance arrangements also continue to be robust, with a comprehensive review of
the infrastructure to enable hybrid meetings and an effective Audit and Scrutiny Committee. The Council continues to be open
and transparent and demonstrates a culture of continuous improvement, with the planned development of the Participation
Strategy.
Openness and transparency
The Council continues to stream full Council and Cabinet
meetings, and publishes all meeting agendas and minutes on
the Council website, thereby continues to demonstrate
openness and transparency of decision making and
performance information (which is considered further on page
21).
The Council has continued to engage with communities on plans
and decisions. This has included being one of the earliest pilots
for the “Consul” platform with COSLA which has been used to
engage in consultations and debates such as the future of halls,
centres and libraries, how the Council spend its budget and
climate change.
In February 2022, the Cabinet approved a “Participation Strategy
– Statement of Intent” which aims to develop a Participation
Strategy for Communities. The Statement of Intent summarises
the current main ways in which citizens can take part in local
governance. A community consultation will then follow to co-
design, co-develop and co-produce a Strategy to wider
democratic participation, seeking to reach new ways of
connectingwith citizens.
27

Page 28

20
Significant risksidentified in Audit Plan
The COVID-19 pandemic is expected to continue to have a substantial impact on performance
reporting. There therefore remains a risk that the Council is unable to demonstrate that resources are
being used effectively with a focus on continuous improvement. We have therefore reviewed the
performance reports presented at the Council to assess the extent of openness and transparency
duringthe year, as summarised on the followingpages.
Performancemanagement framework
The Council has a Performance Management Strategy covering 2021 – 2024 “Driving continuous
improvement for the people of North Ayrshire”. It sets out how the Councils’ performance
management supports a culture of continuous improvement and an overview of planned
developments.to ensure continuous improvement. It has considered the impact of the COVID-19
pandemic on certain elements of performance management such as team workload, an increase in
externalreportingandtheneedto consider howthe performancereportingis consumed.
During 2021/22, the Council has replaced its North Ayrshire Performs portal with a new Performance
Dashboard which was developed in-house. This provides a more user friendly and accessible way for
residents to access performance data. The Council has reported that due to the innovative way that it
is presenting its information, it has been approached by several Councils in Scotland and Northern
Irelandto providedemonstrationsandadvice.
Statutory performance indicators
The Accounts Commission has a statutory responsibility to define the performance information that
councils must publish. This responsibility links with the Commission’s Best Value (BV) audit
responsibilities. In turn, councils have their own responsibilities, under their BV duty, to report
performance to the public. The Accounts Commission Statutory Performance Information Direction
requiresa council to reporta range of informationin the areas listed on thefollowing page.
Value for money
Are resources being
used effectively?
Are services
improving?
Is Best Value
demonstrated?
Value for money
28

Page 29

21
Statutoryperformanceindicators (continued)
SPI 1: Improving local servicesand outcomes
• Performance in improving local public services provided by
(1) the Council itself and (2) by the council in conjunction
with its partnersandcommunities; and
• Progress againstdesiredoutcomes.
SPI 2: Demonstrating Best Value (BV)
• The Council’s assessment of how it is performing against its
duty of BV, and how it plans to improve against this
assessment;
• Audit assessments of how its performance against its Best
Value duty, and how it has responded to these assessments;
and
• In particular, how it (in conjunction with its partners as
appropriate) has engaged with and responded to its diverse
communities.
We have evaluated the effectiveness and appropriateness of the
arrangementsthattheCouncil has in place.
In view of the approach embedded within the Council for a
number of years, with performance monitored through the
Community Planning Partnership and Local Outcome
Improvement Plan, the requirement to report on performance
for both the Council and with its partner communities was
already embedded practice. As noted on page 20, the approach
has been enhanced with the development of the new
PerformanceDashboard.
Performance data
The Council has continued to report performance measures, in
particular:
1. A Mid-Year Progress Report 2021/22 against the Council
Plan was considered by the Audit and Scrutiny Committee in
March2022.
2. An analysis of the Council’s performance within the Local
Government Benchmarking Framework (LGBF) based on the
2019/20 data analysis was considered by the Cabinet in
November2021.
We have consideredeach of these below.
The Mid-Year Progress report 2021/22 has analysed the
performanceindicatorsfrom theCouncil Plan as follows.
Value for money
0.0% 20.0% 40.0% 60.0% 80.0% 100.0%
2017/18
2018/19
2019/20
2020/21
2021/22 (Q2)
Performance Indicators
On Target Slightly Adrift Significantly Adrift
29

Page 30

22
Value for money
Performance data (continued)
At a high level, the Performance Indicators are showing a slightly
better performance when comparing mid-year 2021/22 with the
year-end 2020/21. Clear actions are in place in relation to those
indicators thatare adriftof target.
The update also confirms that all actions from the Council’s
Delivery Plan are either on target or slightly adrift at the mid-
year point2021/22 comparedto 95.1% at year-end2020/21.
The layout of the mid-year report has been refreshed to
complement the Annual Performance Report layout to help
ensurethatit as readerfriendlyas possible.In addition:
• The “Key Highlights” sections are now named “Key Activities”
to incorporate updates on areas where teams are
experiencingchallenges as well as positive outcomes.
• Summaries of overall Council Plan actions are included in the
Performance Summary section. Sub-action detail is only
included where a sub-action is causing an action to adrift of
target.
• Summaries of Council Plan indicators and actions are
presentedas piecharts for clarity.
The LGBF 2019/20 Data Analysis, being the most recent data
that is available, provided benchmarking data on 97 indicators
covering a wide range of key service areas. Due to the large
scope of the LGBF, not all indicators are priority areas for the
Council so variationin performanceis to be expected.
The report provided to Cabinet provides a summary of
performance only as it was concluded that as the data relates to
a period prior to the pandemic, as well as the subsequent delay
in the release of the data, it would not be appropriate to detail
improvement activity based on the 2019/20 performance.
Directorates are using the information alongside learning from
the pandemic to look at individual improvements at service
level.
A summary of how North Ayrshire Council compares across all
local authorities is shown on the next page. In the short term,
22% of indicators have improved their quartile, with only 17%
declining. In the long-term, 84% of indicators have either
improvedor notchangedtheirquartile.
30

Page 31

23
Performance data (continued)
LGBF Performance
.
Value for money (continued)
Deloitte view – Value formoney
The Council continues to have a clear and robust
performance management framework in place
which has been enhanced in the year with the
Performance Management Strategy and new
Performance Dashboard. It has continued to
report its performance against the priorities
within the Council Plan and also against the LGBF,
with clear actions in place to address indicators
thatare adriftof target.
The Council also continues to have robust
arrangements in place to comply with the SPI
Direction, including its public performance
reportingrequirements.
31

Page 32

24
2021/22 is year six of the extended six-year approach to auditing BV in councils.
BV audit work is integrated with the annual audit and have worked closely with
Audit Scotland’s Performance Audit and Best Value (‘PABV’) team to plan, perform
andreporton theBV auditwork.
A key feature of the approach to auditing BV is the Controller of Audit providing a
Best Value Assurance Report (‘BVAR’) to the Accounts Commission for each
Council once over the audit appointment. The BVAR for North Ayrshire Council
was published in June 2020. This concluded that the Council has a number of
arrangements in place to secure best value. We have followed up on the progress
with the recommendations as part of the annual audit work, considering the pace
and depth of continuous improvement. A summary of the progress against each
recommendationis reportedon pages 25 to 28.
Our BV audit work is integrated into our audit approach, including our work on the
audit dimensions discussed on pages 5 to 23. Through our annual audit work,
discussed further within this report, the Council continues to have a number of
arrangements in place to secure best value, including an established governance
framework, strong leadership, and a comprehensive performance management
framework.
The Council recognises that it must deliver services within the financial resources
available and, as noted elsewhere in this report, and in common with other
councils, continued work will be required to deliver long-term financial
sustainability. it is positive to note that the development of the Sustainable
ChangeProgramme andtheRecovery andRenewal Investment.
It is the duty of the Council to secure Best Value as prescribed in Part 1 of the Local Government in Scotland Act 2003. We have a
statutorydutyto be satisfied thattheCouncil have made properarrangementsforsecuring BV.
Best value
Duty to secure Best Value
1. It is the duty of the Council to make
arrangements which secure Best Value.
2. Best Value is continuous improvement in the
performance of the Council’s functions.
3. In securing Best Value, the Council shall
maintain an appropriate balance among:
a) The quality of its performance of its
functions;
b) The cost to the Council of that
performance; AND
c) The cost to persons of any service
provided by the Council for them on a
wholly or partly rechargeable basis.
4. In maintaining that balance, the Council shall
have regard to:
a) Efficiency;
b) Effectiveness;
c) Economy; AND
d) The need to make the equal opportunity
requirements.
5. The Council shall discharge its duties in a way
that contributes to the achievement of
sustainable development.
6. In measuring the improvement of the
performance of an Council’s functions, regard
shall be had to the extent to which the
outcomes of that performance have improved.
Deloitteview – BestValue
The Council has robust arrangements in place to secure best value and
has a clear understandingof areaswhich requirefurtherdevelopment.32

Page 33

25
Best Value (continued)
Best Value Assurance Report
We have assessed the Council’s progress against each of the recommendations made, as summarised in the table below.
Recommendation – August 2020 2021/22 update
The Council should fully develop and deliver
detailed transformation plans to meet the
current estimated funding shortfall. To achieve
this, it shouldensure
sufficient arrangements are in place to
support, monitor and deliver the expected
outcomes. Thisincludes:
• developing the transformation themes into
projects and further developing the
governance arrangements to ensure the
council has theskills neededto;
• implement the next stage of transformation;
and
• developing a robust benefits realisation
tracker to assess whether the council has
achievedits aims.
The Transformation and Renewal Programme continues to be progressed. The
broad outline of the programme was included in the Budget report to Council on
4th March 2021. The Governance structure which supports the programme is in
place through Transformation Boards, aligned to the Council Plan themes of
Inspiring Place, Aspiring Communities and A Council for the Future, as well as
through the Executive Leadership Team. All the individual projects / activities have
been assigned to individual owners and a new Sustainable Change Programme for
2022/23 and beyond (rather than Transformation and Renewal programme) was
discussed by the ELT in November 2021 with further discussions in January 2022
priorto the startof thenew financialyear.
A new monitoring framework to track progress has been developed. This provides
a medium-to-long term (10 years) framework which is split across agreed budget
programme activity (approved on 4th March 2021) and budget pipeline activity i.e.
projects / activities which continue to be progressed and developed. The impact on
how this activity addresses the anticipated budget gap is also reflected in the
framework. Importantly, the framework also captures any workforce implications
for delivery and also the full time equivalent impact of any anticipated savings as
well as capturingtheanticipatedkey outcomes.
33

Page 34

26
Best Value (continued)
Best Value Assurance Report (continued)
Recommendation – August 2020 2021/22 update
The Council must evolve workforce planning
across all services, and clearly align service
workforce plans to the transformation
projects, in orderto:
• identify the numbers, cost and skills of
thecurrentanddesiredworkforce; and
• effectively facilitate the transition from
the current workforce composition to the
desiredworkforce.
Workforce planning discussions recommenced in 2021 and have been updated at six
monthly intervals for the majority of services. These meetings ensure that workforce
planning is aligned with challenges, service reviews and the transformation agenda. In
addition, the monitoring framework for transformation has been implemented and
includes workforce information linked to transformation activity. Heads of Service
have two workforce planning meetings, Workforce Plan and Workforce Costs. The
Workforce Plan covers the workforce demographics, transformation, PESTLE analysis
and service review activity which helps shape the desired future workforce. The
Workforce Costs meeting provides information on absence costs, overtime, vacancies
etc. as well as key information that Heads of Service need to inform their planning in
relationto theircurrentanddesiredfutureworkforce
The Council should work with locality
partnerships to make clear what the
intended impacts are of locality plans and
make thempubliclyavailable.
Extensive work was undertaken in 2020 and 2021 on the refresh of locality
partnership priorities. This led to five locality partnerships agreeing their ongoing
priorities at their June 2021 meetings. A focus of this work was devising priorities
which target local inequalities, as a result they are now clearer on the impact they
want to achieve, e.g. Kilwinning moving from “traffic and parking” to “alleviating
poverty and promoting equality of access to opportunities”. The Arran Locality
Priorities are being assessed on the recent islands plan and LOIP community
engagements.
Once the plans to support each locality’s priorities are agreed, these will be published
on the Community Planning website. This will add to the existing wide range of
locality partnership information available such as meeting papers which include local
progress updates,thecurrentlocality partnershipprioritiesandimpact summaries
34

Page 35

27
Best Value (continued)
Best Value Assurance Report (continued)
Recommendation 2021/22 update
The Council should review its Public
Reporting online portal, North Ayrshire
Performs, to make it more user friendly
andaccessible.
The Council has replaced its North Ayrshire Performs portal with a new Performance
Dashboard developed in-house by the Corporate Policy, Performance and Elections Team
andlaunchedon 28thFebruary2021.
The dashboard provides a much more user friendly and accessible way for our residents to
access our performance data. It reviewed the information available to ensure it is as
concise and relevant as possible; that it contains a link to the LGBF Benchmarking Tool; and
includes our contact details. It also ensured the layout is in line with our corporate and
AnnualPerformanceReportingbrandingandcan be updatedwith anychanges.
The dashboard is available from the performance pages within the North Ayrshire Council
website www.north-ayrshire.gov.uk/performance and linked to within the six monthly
Council Plan performancereports.
Due to the innovative way the council is presenting its information, it has been
approached by several councils in Scotland including Midlothian Council and
Aberdeenshire Council as well as Lisburn and Castlereagh City Council in Northern Ireland,
to provide demonstrations and advice. It has worked closely with the GIS and Analytics
Team to provide support on more technical areas such as Power BI licensing and
integrating Power BI with performance management systems. As the dashboard was
developed in-house the Council has full control of its evolution and will continue to make
improvements based on general feedback as well as learning from the informal network
beingestablishedthroughour demonstrations.
35

Page 36

28
Climate change
Emerging issues
Background
In our 2020/21 report, we set out a high level assessment of the work that the Council has done in relation to preparing for the
impact of climate change against our baseline expectations. This concluded that climate change is clearly on the Council’s agenda,
recognised as a strategic risk and the Environmental Sustainability and Climate Change Strategy has set key targets to achieve net-
zero carbonemissions across NorthAyrshire.
In March 2022, Audit Scotland published at report Addressing climate change in Scotland | Audit Scotland (audit-scotland.gov.uk)
drawing together the key themes identified across a range of published recommendations for Scotland and set out a high level
summary of the key improvements that need to be made across the public sector if Scotland is to reach its climate change ambitions
of a just transition to net zero and adapting to improve resilience to the effects of the global warming we are already experiencing.
We have summarised each of these key themes below, along with the suggested actions. We recommend that the Council carry out a
self assessment against each of these pointsanddevelopan action planto helpfocuson where furtherwork is required.
Key themes Suggested actions
Leadership – public bodies should make
responding to climate change a core value and
key outcome.
Public bodies can lead the way through developing procurement framework and
contracts with economic, social and environmental requirements and with
developingandmaintainingstandardsandregulations.
Governance – climate change plans need to
have robust governance arrangements to
ensure a clear approach to delivery which
allows collaboration and integration and can
address and resolve any conflicts between
partners, priorities and policies. It also needs
to support fast-paced changes to plans,
technologiesandpolicies.
Good governanceensuresaccountabilityandtransparency.It requires:
• Monitoring,evaluating,reportingandverifyingplanswith clear timeframes;
• Feedback mechanisms to review how things work as they are being
implemented;
• Processes for how projects will be upscaled and alternatives proposed where
projects are not deliveringwhat is expected; and
• Effective scrutiny, oversight and challenge by elected members and non-
executive boardmembers.
36

Page 37

29
Climate change (continued)
Emerging issues (continued)
Key themes Suggested actions
Community empowerment to develop local
solutions – actions to address climate change
could potentially have an unequal impact on
some people and communities. Climate
change should become a priority issue that
public bodies and their partners engage with
local communities on.
Incorporating climate resilience and net zero targets into existing local plans and
initiatives, such as city and regional deals and participatory budgeting, will make it
easier forpublicbodies to work with communities andsupportfasterprogress,
Behavioural change – clearer information on
the environmental impact of people’s choices
is needed for all of us to make informed
decisions, particularly around sustainable diet,
waste andtravel.
There is a need for clear plans to influence societal change and help people adapt to
climate change and smooth transition to net zero.. Greener options need to be
attractivein terms of qualityandaffordability.
Public bodies should make efforts to sustain some of the changes in behaviours
beneficial to emission reduction that emerged in the COVID-19 lockdowns, such as
remote working, replacing business travel with videoconferencing and online
collaboration,andbroaderlifestylechoices includingmore walking andcycling.
Alignment of policy and spend – the type of
leadership outlined on the previous page,
would support the alignment of all policy and
funding decisions. However, the challenge is
significant.
Policy alignment – all policies should be reviewed individually and holistically to
identify conflicts or incoherence with climate change ambitions and be amended as
required. The complex landscape, and sheer number of strategies and plans that
will play a part in delivering net zero and reducing the impacts of climate change
makes this challenge harderat all levels of publicsector.
Alignment of spend – budgets and spend (both capital and revenue) should align
with climate change ambitions. Public bodies will also need to ensure all future
funding and investment decisions are based on their contribution to climate change
ambitionsandan inclusive, net zero carboneconomy.
37

Page 38

30
Climate change (continued)
Emerging issues (continued)
Key themes Suggested actions
Robust planning for net zero, mitigation and
adaption – robust cross-sector plans are
essential, but experts recognise the challenge
is colossal.
As urgent action is required, climate change plans need innovative thinking to
address the inherent tensions between doing things thoroughly and doing things
quickly. Lessons could be learnt from the public sector’s response to the COVID-19
pandemic. Climate change planning needs to happen collaboratively, with a range of
private and public sector bodies, third sector organisations, and communities, as
well as simultaneously in different geographical areas. Climate experts should also
be involvedin planning.
Plans should provide clarity in delivery and implementation with sufficient detail
andclear timelines.
38

Page 39

31
Our report is designed to help you meet your governance duties
Purpose of our report and responsibility statement
What we report
Our report is designed to help the Audit and Scrutiny Committee
and the Council discharge their governance duties.
What we don’t report
As you will be aware, our audit was not designed to identify all
mattersthatmay be relevantto theCouncil.
Also, there will be further information you need to discharge
your governance responsibilities, such as matters reported on by
managementor byotherspecialist advisers.
Finally, our views on internal controls and business risk
assessment should not be taken as comprehensive or as an
opinion on effectiveness since they have been based solely on
the audit procedures performed in the audit of the financial
statements and the other procedures performed in fulfilling our
auditplan.
We welcome the opportunity to discuss our report with you and
receive your feedback.
The scope of our work
We described the scope of our work in our audit plan.
Use of this report
This report has been prepared for the Council, as a body, and we
therefore accept responsibility to you alone for its contents. We
accept no duty, responsibility or liability to any other parties,
since this report has not been prepared, and is not intended, for
any other purpose.
Pat Kenny, CPFA
For and on behalf of Deloitte LLP
Glasgow | 13 May 2022
39

Page 40

32
Sector developments
40

Page 41

33
Financial overview 2020/21
Local government in Scotland
Background and overview
The Accounts Commission published its Local government in Scotland financial overview 2020/21 in March 2022. This covers the
first full year that makes clear the impact of COVID-19. It also looks ahead to the medium-to-longer term financial outlooks for
Councils.
Key messages
Local governmentfinances 2020/21
• The Covid-19 pandemic persisted throughout 2020/21, with the Scottish Government increasing funding to councils by
£1.5 billionto supportthemin dealingwith the impacts of the pandemic.
• When Covid-19 funding is excluded, there has been a real terms underlyingreduction of 4.2 per cent in local government funding
since 2013/14.
• The underlying increase in Scottish Government funding of £358 million in 2020/21 was 1.1 per cent in real terms. But, over half
of this increase is due to specific grants. Ring-fenced funding helps support delivery of key Scottish Government policies but
constrains a proportion of the total funding and resources and removes any local discretion over how councils can use these
funds.
• Councils’ income from customers andclients was affectedbyCovid-19restrictionsandfellby£0.5 billion.
• In 2020/21, all councils reported surpluses and increased their usable reserves. The total increase in reserves was £1.2 billion
(46 per cent).Thisincrease was mainlydue to late Covid-19funding,which was unspentat 31 March2021.
• Councils administered a further £1.4 billion of Covid-19 grants on behalf of the Scottish Government in 2020/21, putting
additionalpressureon financestaffacross councils.
Mediumandlonger-termoutlook forlocal governmentfinances
• Scottish Governmentcapitalfundingto councils is expectedto fall again in 2021/22.
• Uncertainty over the amount of funding available for Covid-19 recovery at the end of 2020/21 led to difficulties in setting
budgets,andmanycouncils establishedupdatedCovid-19budgetsin autumn2021.
• Covid-19 resulted in revised medium-term financial plans, but longer-term planning will need to be updated as Covid-19
uncertaintydiminishes. 41

Page 42

34
Financial overview 2020/21 (continued)
Local government in Scotland (continued)
Key observations Audit Scotland Recommendations
Reserves – Most of the increase in the generalfund is committed
to Covid-19recovery.
Elements of Covid-19 funding that are being carried forward in
general earmarked and unearmarked reserves in the accounts
shouldbe clearly identified.
Financial management and transparency - Management
commentaries in councils accounts have improved, but many are
still not complying with previous recommendations on
transparency
We recommend again that councils review and improve how
they comply with these key expectations of transparency, in
particular:
• Is the outturn against budget position for the year clearly
shown, andare thereasons forsignificantvariances obvious?
• Is the outturn reported in the narrative reconciled to the
movement in the general fund contained in the financial
statements,andare major differencesexplained?
• Is progress against agreedsavings reported?
Budgets for 2021/22 - The uncertainty over the funding position
for Covid-19 at the end of 2020/21 led to issues in budget setting
andmanycouncils establishedCovid-19budgetsin autumn2021
We expect councils to agree spending plans and timescales for
Covid-19 recovery reserves with the relevant decision making
committee.
Medium and long-term financial planning - Covid-19 resulted in
revised medium-term financial plans, but longer-term planning
will needto be updatedas Covid-19uncertaintydiminishes.
All councils will now need to revise medium-term financial plans
to reflect additional financial pressures and updated funding
arrangements and to account for updated savings requirements
and financial assumptions. Councils should also review longer-
term planningas Covid-19uncertaintydiminishes.
Next steps
The Council should consider each of the above recommendations and incorporate into plans where not already considered. The
full report is available through the following link: Local government in Scotland: Financial overview 2020/21 | Audit Scotland
(audit-scotland.gov.uk) 42

Page 43

35
Deloitte insights
The future of infrastructure: A survey of infrastructure trends
Background and overview
A new economic reality calls for infrastructure reimagined: more digital, more sustainable, more equitable. From broadband to bike
lane’s, Deloitte centre for government insight has asked experts how infrastructure will change. Some of the key highlights are
summarised below, with thefullarticle availablehereFutureof infrastructure| DeloitteInsights
• Many respondents expect more work from home, more broadband, and more transportation options. 
However, only 4% believe that there will be fewer people living in cities.
The pandemic is shifting demand
• As government shift to more digital infrastructure, cyber risk becomes a concern. About 76% of global
infrastructure leaders expect greater focus on data security over the next three years.
Cybersecurity a top concern
• Many respondents expect artificial intelligence, cloud computing, and cybersecurity to reshape infrastructure –
a clear signal that infrastructure is going digital.
Technology will reshape infrastructure
• About 60% of respondents globally said that they plan to invest in urban places for walking, cycling, socialising
and eating.
Green infrastructure is in demand
• Interestingly, respondents see talent shortage as a bigger obstacle to executing infrastructure projects than
budget constraints or regulatory barriers.
Infrastructure’s biggest obstacle? Talent
43

Page 44

Deloitte LLP does not accept any liability for use of or reliance on the contents of this document by any person save by the
intended recipient(s) to the extent agreed in a Deloitte LLP engagement contract.
Deloitte LLP is a limited liability partnership registered in England and Wales with registered number OC303675 and its
registered office at 1 New Street Square, London, EC4A 3HQ, United Kingdom.
Deloitte LLP is the United Kingdom affiliate of Deloitte NSE LLP, a member firm of Deloitte Touche Tohmatsu Limited, a UK
private company limited by guarantee (“DTTL”). DTTL and each of its member firms are legally separate and independent
entities. DTTL and Deloitte NSE LLP do not provide services to clients. Please see www.deloitte.com/about to learn more
about our global network of member firms.
© 2022 Deloitte LLP. All rights reserved.
44

Page 45

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Accounts Commission’s Report: Local Government in
Scotland: Financial Overview 2020/21 
Purpose:  To inform the Audit and Scrutiny Committee of the findings of
the recently published report. 
Recommendation:  That the Committee i) notes the findings of the recent Accounts
Commission report, and (ii) notes the current position of North
Ayrshire Council in relation to the findings. 
1. Executive Summary 
1.1 The Accounts Commission published its 2020/21 financial overview of local
government in Scotland in March 2022. The report provides a high-level independent
analysis of the financial performance of local authorities during 2020/21. A link to the
report is attached below;  
Local Government Financial Overview Report 
1.2  The report analyses the annual accounts produced by local authorities, together with
the reports of each body’s external auditors, to identify their relative performance,
highlight the challenges faced and assess their responses to these challenges. The
report has a summary of key findings with more detail provided in four parts; 
• Part 1 - Councils’ income in 2020/21;
• Part 2 - Councils’ financial position in 2020/21; and
• Part 3 - Councils’ financial outlook. 
1.3  Appendix 1 provides Council relevant feedback on each of the key messages
identified. 
2. Background 
General Fund 
2.1 The report provides a high-level independent analysis of the financial performance of
local authorities during 2020/21 and their financial position at the end of that year 
Agenda Item 3
45

Page 46

2.2  A summary of the key messages is provided within the report with further information
provided in 3 main sections: 
• Part 1 - Councils’ income in 2020/21;
• Part 2 - Councils’ financial position in 2020/21; and
• Part 3 - Councils’ financial outlook. 
2.3 The key messages for Councils are summarised below: 
• Councils received an additional £1.5billion in Scottish Government funding to
address the impacts of the Covid-19 pandemic; 
• There has been an underlying real terms reduction in local government funding of
4.2% since 2013/14; 
• More than half of all additional funding received during 2020/21 was ringfenced to
support the delivery of Scottish Government policies, removing local discretion over
how these funds could be used; 
• Council income from customers and clients reduced by £0.5 billion as a result of
Covid-19 restrictions; 
• All Councils increased their usable reserves as a result of late Covid-19 funding
which was unspent at 31 March 2021; 
• Councils administered £1.4 billion of Covid-19 grants on behalf of the Scottish
Government, putting additional pressure on Council staff; 
• Capital expenditure reduced by more than 20% as a result of Covid-19 restrictions;
and 
• Covid-19 pressures contributed to greater and more frequent errors in Councils’
unaudited accounts. 
2.4 In addition, the report identifies a number of issues in relation to the medium and
longer term outlook for local government finances, including: 
• Scottish Government capital funding to Councils is expected to fall in 2021/22; 
• Uncertainty over Covid related funding during 2020/21 led to difficulties in setting
2021/22 budgets; and 
• Covid-19 resulted in revised medium term plans but longer term financial plans will
need to be updated as the uncertainties arising from Covid-19 diminish. 
2.5 An update on the position for North Ayrshire Council is noted below: 
• The impact of Scottish Government funding in relation to both the impact of Covid-
19 and underlying Council funding is summarised in part 1 of appendix 1; 
46

Page 47

• Council reported £66m of General Fund Usable Reserves at 31 March 2021. This
was an increase of £31.5m as detailed in part 2 of appendix 1; 
• During 2020/21 the Council administered £40m of business grants plus a further
£14.8m of Non Domestic Rates Covid related reliefs on behalf of the Scottish
Government; 
• The rephasing of £26.4m of Capital projects as a result of Covid related restrictions
was reported to Council during 2020/21; 
• The annual report of the Council’s external auditors was presented to the Audit and
Scrutiny Committee on 27 September 2021. This report identified no materials
issues or errors in the unaudited accounts;   
• Council approved the Capital Investment Programme 2022/23 to 2030/31 on 2
March 2022 which outlined the Council's investment plans and assumed levels of
capital funding for the next nine years. This included assumed General Capital
Grant funding of £9.8m each year; 
• Council approved the General Services Revenue Estimates 2022/23 to 2024/25 on
2 March 2022 which provided Members with an overview of the Council's
anticipated financial position on the General Fund revenue budget for the next
three financial years and confirmed an additional investment of £1.7m to develop
an energy based community support model to provide sustainable support to
residents; and 
• The Long Term Financial Outlook 2021/22 to 2030/31 was approved by Council on
16 December 2020 and provides the cornerstone of the Council’s strategic financial
framework and establishes a sound basis for the development of the Council’s
medium term financial plans and annual budgets. This is scheduled for a full review
during 2023/24. 
3. Proposals 
3.1 It is proposed that the Committee i) notes the findings of the recent Accounts
Commission report, and (ii) notes the current position of North Ayrshire Council in
relation to the findings. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Accounts Commission report highlights the reliance of local government on
Scottish Government grant funding and the need for the development of robust
medium and longer term financial plans to develop sustainable solutions to support
recovery following the Covid-19 pandemic and bridge the anticipated funding gap.
North Ayrshire Council develops medium term financial plans on a three year rolling
basis and Council has approved a Long Term Financial Outlook covering the next 10
year period. The financial sustainability of the Council, including the impact of the
Covid-19 pandemic, is monitored regularly and reported to Cabinet throughout the
year.
47

Page 48

Human Resources 
4.2 As part of a sustainable financial strategy the Council continues to actively manage the
size of its workforce. Regular communication and consultation takes place with the
workforce and Trade Unions. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Equality impact assessment are carried out for all options identified as part of the
medium and long term financial plans. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 In addressing the financial challenges which it faces, the Council seeks to minimise the
impact on delivering its key priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Executive Directors are consulted in the development of the Medium and Long term
Financial plans and the development of investment and recovery and renewal
strategies. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
None
48

Page 49

Appendix 1
Local Government in Scotland Financial Overview 2020/21 
Part 1 Councils’ Income on 2020/21 
Ref Key Message NAC Feedback
I1 The Covid-19 pandemic persisted throughout 2020/21, with
the Scottish Government increasing funding to councils by
£1.5 billion to support them in dealing with the impacts of
the pandemic. 
In 2020/21 NAC received £29.4m additional General
Revenue funding and £4.5m additional specific revenue
grants in relation to Covid pressures.
I2 The underlying increase in Scottish Government funding to
councils of £358 million in 2020/21 was 1.1 per cent in real
terms. But, over half of this increase is due to specific
grants, which are now £710 million. Ring-fenced funding
helps support delivery of key Scottish Government policies,
such as expanding early learning and childcare services,
but constrains a proportion of the total funding and
resources and removes any local discretion over how these
funds can be used by councils. 
During 2020/21 the level of non Covid related Scottish
Government funding received by NAC increased by £15.9m,
equivalent to a 1.0% reduction in real terms. £5.6m of this
increase was due to additional specific grants, primarily in
relation to the expansion of Early Learning and Childcare.
I3 When Covid-19 funding is excluded, there has been a real
terms underlying reduction in local government funding of
4.2 per cent since 2013/14.
Between 2013/14 and 2020/21 the level of non Covid
related Scottish Government funding received by NAC
increased by £34.3m. This was equivalent to a 4.1%
reduction in real terms 
49

Page 50

Part 2 Councils’ financial position in 2020/21 
Ref Key Message NAC Feedback
P1 Savings plans were mostly delivered across councils, but
with significant variation.
The 2020/21 General Services Revenue Estimates
included savings targets of £4.439m across all services.
Although the majority of savings were delivered in year,
several were impacted by the Covid-19 pandemic. These
were offset by other underspends within the services and
will be further developed once all restrictions are lifted. 
The impacted savings included: Review of Facilities
Management in Schools £0.155m; Property Rationalisation
£0.140m; increased fee income linked to the Capital
Programme £0.093m; increased factoring income
£0.119m; and other minor savings £0.097m.
P2 All councils increased their usable revenue reserves,
mainly due to late Covid-19 funding which was unspent at
31 March 2021. The total increase was £1.2 billion
Total General Fund Reserves increased by £31.5m
between 2019/20 and 2020/21, including £17.9m of Covid
related funding, £8.0m of commitments delayed because
of Covid related restrictions and £2.5m of agreed
investment in recovery and renewal programmes.
P3 Capital expenditure reduced by more than 20 per cent in
2020/21 due to Covid-19
The total value of General Fund capital projects rephased
during 2020/21 as a result of Covid restrictions was
£26.4m, 33% of the original planned expenditure.
P4 Councils administered a further £1.4 billion of Covid-19
grants on behalf of the Scottish Government. The need to
administer payment of these grants quickly to support the
local economy put additional pressure on finance staff
across councils.
NAC administered £40m of business grants during
2020/21, plus a further £14.8m of Non Domestic Rates
Covid related reliefs. 
Several sections across the Council were involved in the
administration of these grants, including Revenues, Legal
and Business Development. Where additional funding for
administration was provided by the Scottish Government,
the timescales involved did not allow for the recruitment or
training of additional staff. 
50

Page 51

P5 Covid-19 pressures contributed to greater and more
frequent errors in councils’ unaudited accounts. Auditors
also reported wider issues relating to Covid-19, including
the slowing of progress in some councils’ transformation
plans, the impact of reduced income on arm’s-length
external organisations (ALEOs) and what that means for
their financial sustainability, identified weaknesses in
internal control systems, and adverse impacts on long-
term planning and capacity.
No material errors were reported in the NAC annual
accounts for 2020/21 which were completed and audited
within statutory timescales. However, a number of
adjustments were required to the accounts during the audit
phase as a result of late or incomplete guidance from the
Scottish Government and Audit Scotland in relation to the
treatment of Covid related issues including mobilisation
funds provided to the IJB and PPE provided to the Council
by the NHS. 
KA Leisure reported significant reductions in income for
the year resulting a trading deficit of £1.9m. A detailed
financial recovery plan, including the provision of additional
cash flow support from NAC, was approved by Cabinet in
February 2021. 
P6 In line with the recovery in global stock markets, pension
fund investments performed well. In addition, the triennial
funding position improved
Although the value of returns on pension scheme assets
increased during 2020/21, this was offset by an increase in
the value of pension liabilities linked to inflation
assumptions. This resulted in a net increase in NAC’s
share of the Scheme’s liabilities of £58.5m for the year. 
Part 3 Councils’ Financial Outlook 
Ref Key Message NAC Feedback
O1 Uncertainty over the amount of funding available for Covid-
19 recovery at the end of 2020/21 led to difficulties in
setting budgets, and many councils established updated
Covid-19 budgets in autumn 2021.
.
£16.9m of additional Covid related funding was confirmed
on 18 March 2021, after Council had approved the
2021/22 budget. These funds were not recurring and
would not have been available to offset savings
requirements. However, the majority of funds could not be
expended before the end of the financial year and were
51

Page 52

earmarked to support ongoing Covid Recovery and
Renewal and Investment activities in 2021/22 and beyond. 
O2 Initial Scottish Government revenue funding in 2021/22
has increased by 1.1 per cent in real terms
Following confirmation of funding in relation to the Council
Tax freeze in 2021/22, the level of Scottish Government
funding for NAC increased by £7.2m, 2.4%. However, the
increase in core funding, excluding specific grants and
Scottish Government policy commitments was only £2.5m,
0.9%. 
O3 Covid-19 resulted in revised medium-term financial plans,
but longer-term planning will need to be updated as Covid-
19 uncertainty diminishes
NAC’s Long Term Financial Outlook was presented to
Council in December 2020. This is the cornerstone of the
Council’s strategic financial framework and identified an
estimated funding shortfall of £120m over the next ten
years based on best estimates with sensitivity analysis
highlighting the implications of changes to the underlying
assumptions. 
The Long Term Financial Outlook is scheduled for a full
review during 2023/24. 
O4 Scottish Government capital funding in 2021/22 is
expected to fall again. This may have a significant adverse
impact on councils’ investment plans
Excluding ringfenced funding in relation to Flooding
projects, NAC’s General Capital Grant was reduced by
£0.140m, 1%, in 2021/22 and a further £0.022m in
2022/23. 
However, this has been offset by additional ringfenced
capital funding linked to Scottish Government manifesto
commitments including Play Park Renewal and Local
Bridge Maintenance. 
52

Page 53

O5 The long-term funding position for councils remains
uncertain, 
with significant challenges ahead as councils continue to
manage and respond to the impact of Covid-19 on their
services, finances and communities.
NAC approved the 2022/23 to 2024/25 Medium Term
Financial Plan on 2 March 2022. This identified indicative
budget gaps for 2023/24 and 2024/25 of £10.7m and
£8.8m respectively. 
The Long Term Financial Outlook 2021 -2031 has
identified an estimated shortfall of £69m over the period
2025/26 to 2030-31. This is scheduled for a full review
during 2023/24. 
Additional funding received as a result of Covid-19 has
been retained for investment across Education, KA
Leisure, the HSCP and the general Recovery and Renewal
programme to address the long term impact of Covid-19
on the Council and our communities. 
O6 In the longer term, uncertainty creates challenges for
councils as they seek to address cost and demand
pressures that existed before the impact of Covid-19, as
well as develop long-term plans with their partners to
address complex issues such as child poverty and
inequalities, to improve economic growth and to deliver
Scotland’s net zero ambitions
Work continues across NAC to develop the Council’s long
term plans. This is supported by earmarked reserves and
investment funds approved by Council in relation to
financial insecurity, recovery and renewal and
sustainability, including a £1.7m non-recurring investment
approved by Council to develop an energy based
community support model to provide sustainable support
to residents. 
53

Page 54

54

Page 55

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Internal Audit Annual Report 2021/22 
Purpose:  To provide the Committee with an annual report on the work of
Internal Audit during 2021/22 and provide an opinion on the
governance, risk management and internal control environment
of the Council. 
Recommendation:  The Committee is asked to note the content of the annual report
and the opinion of the Senior Manager on the Council’s
governance, risk management and internal control environment. 
1. Executive Summary 
1.1 The Internal Audit Annual Report attached at Appendix 1 provides information on the
work carried out during the period of the 2021/22 audit plan. The plan covered a 14-
month period from 1 February 2021 – 31 March 2022. 
1.2 It is the opinion of the Senior Manager (Audit, Fraud, Safety and Insurance) that
reasonable assurance can continue to be placed on the adequacy and effectiveness
of the Council’s systems of governance, risk management and internal control. 
2. Background 
2.1 The Public Sector Internal Audit Standards (PSIAS) require that the Chief Internal
Auditor prepares an annual report on the activities of Internal Audit and that the report
should contain a view on the adequacy of the Council’s governance, risk management
and internal control frameworks. The annual report for 2021/22 is attached at
Appendix 1 and outlines the role of Internal Audit, the performance of the section
during the year and the key audit findings. It also contains the annual internal audit
opinion. 
2.2 The report gives information on the actual performance against the agreed plan.
Overall, 752 days of audit work took place, which was 63 days less than budgeted.
Section 2 of the annual report provides more information on the reasons for the
shortfall and the corrective action which was taken to amend the audit plan. 
2.3 Section 3 of the report provides information on the assurance level given for each
audit and some of the most significant findings. All audit reports published were
reported to the Audit and Scrutiny Committee.
Agenda Item 4
55

Page 56

2.4 All audit findings during the year support and inform the objective opinion of the Senior
Manager (Audit, Fraud, Safety and Insurance) on the adequacy of the Council’s
governance, risk management and internal control environment. The assurance
category given to each individual audit informs the overall level of assurance. The
annual audit opinion required by PSIAS is included in the attached annual report. 
2.5 The annual internal audit opinion also contributes to the Annual Governance
Statement which is published as part of the Council’s annual accounts and is included
under separate cover in this Audit and Scrutiny Committee agenda for approval. 
2.6 Based on the audit work carried out, the opinion of the Senior Manager (Audit, Fraud,
Safety and Insurance) is that reasonable assurance can continue to be placed on the
adequacy and effectiveness of the Council’s systems of governance, risk
management and internal control. 
3. Proposals 
3.1 It is proposed that the Committee notes the content of the annual report and the
opinion of the Senior Manager on the Council’s governance, risk management and
internal control environment. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building
56

Page 57

4.7 None. 
5. Consultation 
5.1 Council Services are consulted on the findings of Internal Audit throughout the year.
No specific consultations have taken place in relation to this annual report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.  
57

Page 58

INTERNAL AUDIT
ANNUAL REPORT 
2021/22 
58

Page 59

INTERNAL AUDIT ANNUAL REPORT
2021/22 
1 Introduction  
1.1 The Council’s Section 95 Officer has overall responsibility for Internal Audit in North
Ayrshire Council. The Senior Manager (Audit, Fraud, Safety and Insurance) reports
to the Section 95 Officer, with the right of access to the Chief Executive and the
Chair of the Audit and Scrutiny Committee on any audit matter. These rights of
access help ensure the organisational independence of Internal Audit.  
1.2 During 2021/22, the section operated in conformance with the ‘Public Sector Internal
Audit Standards (PSIAS)’. The standards define the way in which the Internal Audit
section should be established and undertake its functions. The section complied with
the PSIAS requirement for an external assessment every five-years; this was last
undertaken by Falkirk Council in 2017 through the peer-to-peer review network of the
Scottish Local Authorities Chief Internal Auditors Group (SLACIAG). The current
external assessment is being carried out by West Dunbartonshire Council and is a
work in progress at the time of writing. The outcome from that review, and any
associated quality assurance and improvement programme, will be reported at a
future meeting of the Audit and Scrutiny Committee.  
1.3 The Internal Audit section also operated under an ‘Internal Audit Charter’ which was
most recently approved by the Audit and Scrutiny Committee in September 2020.  
1.4 One of the requirements of the PSIAS is the publication of an annual report. The aim
of this annual report is to give an overview of the work carried out during 2021/22.
Some information is provided on the resources available to Internal Audit and the
performance of the section.  
1.5 Finally, the report provides an opinion on the overall adequacy and effectiveness of
the Council’s governance, risk management and internal control frameworks. 
2 Planned and Actual Activity during 2021/22  
2.1 The internal audit plan approved by the Audit and Scrutiny Committee in January
2021 and covering a 14-month period from 1 February 2021 – 31 March 2022,
included a plan for 815 audit days.  710 days (87%) were budgeted as ‘productive’
and allocated for carrying out audit work. A further 105 days (13%) were budgeted for
‘non-productive’ time: management and strategy, attendance at meetings,
administration and staff training and development. Time is determined as ‘productive’
or ‘non-productive’ in line with definitions produced by CIPFA. 
2.2 A mid-year review of the internal audit plan was approved by the Audit and Scrutiny
Committee in November 2021.  The revised plan included a total of 780 planned audit
days. 644 days (83%) were budgeted as ‘productive’ and a further 136 days (17%)
were budgeted as ‘non-productive’.  The following audits were removed from the plan
and deferred to the 2022/23 internal audit plan which was approved by the Audit and
Scrutiny Committee in March 2022: 
• Museums and Heritage
59

Page 60

• Agency staff and workers
• Transport Journeys and Hires
• Building Services Procurement
• Facilities Management Procurement
• Workforce Planning
• Social Care establishments.  
2.3 During 2021/22, 752 workdays took place; this was 63 days below the original audit
plan target and 28 days below the revised mid-year target. There are three main
reasons for the reduction:
• The former Senior Manager (Audit, Fraud, Safety and Insurance) was
promoted to another post within the Council on 7 June 2021. The newly
appointed Senior Manager came into post on 19 August 2021.  In the interim,
the Audit Manager took on the role of Acting Senior Manager for Internal Audit
and Corporate Fraud.  This had an impact on the audit days available.
• An extension to the temporary change in the Council structure meant that
additional time was spent on directly line managing the Insurance Team. This
remained the case until March 2022 when the Risk and Insurance Manager
returned from secondment.
• Higher than anticipated sickness absence levels were experienced by the
Internal Audit Team in February and March 2022.  
2.3 There were 615 actual ‘productive’ days during 2021/22 and 138 ‘non-productive’
days. At 82% of total actual days, this meant productive days were around 5% below
the original percentage target but consistent with the revised mid-year estimate.  
2.4 In line with the Council’s defalcation procedures, all instances of suspected fraud and
irregularity should be reported to Internal Audit. These are investigated by the
specialist Corporate Fraud Team and are not included within this annual report. 
3 Audit Findings  
3.1 All audit reports which were finalised during 2021/22 were reported to meetings of the
Audit and Scrutiny Committee in September and November 2021, and January,
March and May 2022.  
3.2 The assurance levels from each of the audits were as follows:   
September 2021 Committee 
Audit Title Assurance Level
IJB Governance Substantial
Supply Teachers Reasonable
Sustainability Substantial
Temporary Posts and Contracts Substantial/Limited
Waste Management  Substantial
Sustainability Payments to Care Providers Substantial
Aids and Adaptations Limited
Procurement Cards Limited 
60

Page 61

November 2021 Committee 
Audit Title Assurance Level
Community Alarms Substantial 
January 2022 Committee  
Audit Title Assurance Level
Payroll Transaction Testing Reasonable
Procurement of Educational Supplies Reasonable/Limited
Benefits Substantial
CCTV in Council Buildings and Vehicles Limited
Accounts Payable Transaction Testing Reasonable 
March 2022 Committee   
Audit Title Assurance Level
Facilities Management Overtime Controls Limited
Procurement Card Follow Up Reasonable
Performance Indicators Substantial/Reasonable/Limited 
May 2022 Committee  
Audit Title Assurance Level
General Ledger System Reasonable
Health and Social Care Partnership Procurement Substantial
Ayrshire Growth Deal Governance Reasonable
Secondary Schools Substantial 
3.3 The definitions of the assurance levels used by Internal Audit are as follows: 
Substantial The framework of governance, risk management and control is
adequate and effective.
Reasonable
Some improvements are required to enhance the adequacy and
effectiveness of the framework of governance, risk management
and control.
Limited
There are significant weaknesses in the framework of governance,
risk management and control such that it could be or could become
inadequate and ineffective.
None
There are fundamental weaknesses in the framework of
governance, risk management and control such that it is
inadequate and ineffective or is likely to fail. 
3.4 Detailed below are the most significant findings from the audit work finalised during
2021/22:  
3.6 In respect of the audit of Aids and Adaptations, nine actions points were raised in the
report with the key audit concern relating to the delay in follow-ups being carried out
and the lack of evidence that follow-ups had been carried out. Eight of the nine audit
61

Page 62

actions have now been completed with the final action due for completion in June
2022.  
3.7 In respect of the audit of Procurement Cards, four action points were raised with a
view to improving general controls around the use of procurement cards.  This
included training, analysis of spend, and review and approval of transactions.  The
findings from this audit assignment were followed up by Internal Audit during the year. 
All actions were found to be implemented, or in the process of being implemented. 
No further actions were raised by Internal Audit and the revised assurance level was
concluded as Reasonable.  
3.8 Regarding CCTV in Council Buildings and Vehicles, there is a general recognition
across the Council that CCTV images are personal data that require protection,
however there is a requirement to harmonise practices across the Council to ensure a
consistent approach to recording, storing and accessing CCTV images.  Work has
already commenced in the form of a cross service working group to take forward
issues relating to CCTV, including the three actions arising from the internal audit.  
3.9 Finally, for Overtime Controls in Facilities Management, a number of keying errors
were identified as a result of changed notification processes due to COVID-19. It has
been recommended that a longer-term solution to overtime is explored to ensure it is
claimed, authorised and paid correctly. The service has now commenced this work in
the form of a short life working group.  
3.9 These findings, together with those from other audits carried out and the individual
assurance levels detailed above, contribute to the annual internal audit opinion in
section 6 of this report. 
4 Audit Resources  
4.1 The Internal Audit section is directly managed by the Team Manager (Internal Audit),
who reports to the Senior Manager (Audit, Fraud, Safety and Insurance). The Senior
Manager is responsible for Internal Audit, as well as the Corporate Fraud Team, the
Risk and Insurance Team and the Corporate Health and Safety Team.  
4.2 As well as the Team Manager, the Internal Audit team consisted of two part-time
Internal Auditors as well as a part-time Computer Auditor.  
4.3 All staff within the section hold a relevant qualification, either through an institute
which is part of the CCAB (Consultative Committee of Accountancy Bodies) or the IIA
(Institute of Internal Auditors). 
5 Performance  
5.1 During 2021/22, Internal Audit provided regular updates on work carried out to the
Council’s Audit and Scrutiny Committee. Elected Members had the opportunity to
discuss all Internal Audit reports and question either the Senior Manager or relevant
officers from Council services.  
62

Page 63

5.2 The Council’s performance management system, Pentana, is utilised to follow-up on
audit recommendations. Officers with responsibility for implementing recommendations
are required to update the Pentana system and updates are provided to the Audit and
Scrutiny Committee on a quarterly basis. Where actions are overdue, officers may be
required to attend the Committee to update Elected Members on plans to ensure that
actions are implemented.  
5.3 A range of performance indicators are used to monitor performance within the section,
and these are detailed in the table below, along with the two previous years’ actual
figures. These are tracked by the Team Manager on a quarterly basis and are
discussed with audit staff to review performance and identify opportunities for
development.    
2019/20
Actual
2020/21
Actual 
2021/22
Target
2021/22
Actual
% of auditor time spent
productively
87% 82%  87% 82%
Training days per auditor 3.5 days 4.2 days  3.6 days 5.8 days
Final reports issued 27 22  n/a 22
Audits completed within
budgeted days
46% 24%  75% 23%
Draft reports issued within 21
days of fieldwork completion
85% 83%  100% 81%
Final reports issued within 14
days of return of action plan
100% 95%  100% 100%
Actions implemented on time by
Council services
80% 68%  80% 83%
Ad-hoc requests for advice from
Council services
47
requests
63
requests 
n/a 27
requests 
5.4 The ‘percentage of auditor time spent productively’ remains below the annual target but
consisted with the position last year.  Due to ongoing COVID-19 restrictions during
2021/22, this position is as expected.  The 82% actual remains close to the revised
expectations set out in the mid-year review, which estimated a revised actual of 83%.  
5.5 ‘Training days per auditor’ is higher than target.  While 18 days of training was budgeted
for the year, the actual number of days training was 29. This was across all members of
the Internal Audit team. The reason for the difference was due to staff development in
the use of Power BI.  
5.6 Actual performance against the ‘audits complete in budgeted days’ indicator remains
significantly below target and not yet back to pre-pandemic levels. This reflects the
completion of individual audit assignments rather than the audit plan as a whole. Most
audits which were over budget only exceeded the target by one or two days; those
audits which were more considerably over target was due to wider scope than
anticipated (Aids and Adaptations, Procurement Cards, CCTV, and Procurement of
Educational Supplies).  
5.7 Ad-hoc requests for advice are outwith the control of Internal Audit however are noted
to be lower than in previous years.  The previous year of 2020/21 was significantly
higher as a result of more advice arising around changed processes and procedures
relating to covid arrangements in light of new working practices.  In May 2022,
63

Page 64

International Internal Audit Awareness Month, communications have been utilised to
further remind services of the availability of Internal Audit for advice and consultancy.  
5.8 The Internal Audit section also calculates 2 annual performance indicators which are
required by the CIPFA Directors of Finance group. These are as follows:    
2019/20 2020/21 2021/22 
Productive days achieved per audit plan 96.72% 86.47% 85.36% 
Cost of Internal Audit per £1m of net expenditure £510.97 £529.51 £tbc  
5.9 It should be noted that the figures in the table at 5.8 are for the financial year 2021/22.
This differs from the audit plan year which covered a 14-month period.  The figures at
table 5.6 are therefore pro-rated to bring them into line with the financial year for the
CIPFA return.  
5.10 The ‘productive days achieved per audit plan’ remain considerably lower than pre-covid
levels; the reasons for this are outlined at 2.3 above.  It should be noted that this
indicator reflects back to the original internal audit plan as the base point.  If the
productive days were compared with the mid-year plan, the percentage of productive
days achieved per the audit plan is 94.71%.  
5.11 The ‘cost of Internal Audit per £1m of Council net expenditure’ was £529.51 in 2020/21,
a slight increase from £510.97 in 2019/20 but still well below the target of £850. The
2021/22 figure cannot be calculated until the closure of the Council’s draft annual
accounts and will be reported at a later date. 
6 Opinion  
6.1 This statement on the adequacy and effectiveness of the framework of governance, risk
management and internal control is based on the audit work performed during 2021/22
as reported above. It also draws on the experience of audit work carried out in earlier
years as well as assurances received from management and external audit findings.  
6.2 Internal Audit staff have carried out work, both on a corporate basis and within each of
the Service groups and, subject to the comments in section 3 above, the conclusion
drawn from that work was that most of the anticipated governance, risk management
and internal control frameworks were in place and operating effectively.  
6.3 Where Internal Audit identified opportunities for improvement, the responses received
from managers continued to be positive and there was commitment to implementing
Internal Audit's recommendations. 
6.4 On this basis, it is my opinion that reasonable assurance can be placed on the adequacy
and effectiveness of the Council’s systems of governance, risk management and internal
control. 
Laura Miller
Senior Manager (Audit, Fraud, Safety and Insurance)
31 May 2022
64

Page 65

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Annual Governance Statement 2021-22 
Purpose:  To seek approval of the Council’s Annual Governance
Statement for 2021-22 which will be included within the draft
Annual Accounts. 
Recommendation:  That the Committee approves the draft Annual Governance
Statement which is attached at Appendix 1. 
1. Executive Summary 
1.1 The Council’s Annual Governance Statement outlines the governance framework
which is in place and changes which have been made to strengthen the framework
during 2021-22. 
1.2 Approval of the Statement will ensure that the Council complies with the requirements
of the Local Authority Accounts (Scotland) Regulations 2014. 
2. Background 
2.1 North Ayrshire Council is responsible for ensuring that its business is conducted in
accordance with the law and proper standards, and that public money is safeguarded
and properly accounted for and used economically, efficiently, and effectively to
achieve Best Value. 
2.2 The Council is also responsible for putting in place proper arrangements for the
governance of its affairs and facilitating the effective exercise of its functions, which
includes arrangements for the management of risk. 
2.3 The Council has approved and adopted a Code of Corporate Governance, which is
consistent with the principles of the CIPFA/SOLACE framework ‘Delivering Good
Governance in Local Government’. 
2.4 The Local Authority Accounts (Scotland) Regulations 2014 require that local
authorities prepare an Annual Governance Statement, in accordance with proper
practices in relation to internal control, and that this Statement should be approved by
the Audit Committee or equivalent. 
Agenda Item 5
65

Page 66

2.5 Following approval of the Annual Governance Statement, it requires to be signed by
the Leader of the Council and the Chief Executive prior to its inclusion within the
Council’s draft annual accounts. 
2.6 The Annual Governance Statement, which is attached in full at Appendix 1 to this
report, explains how the Council complies with the Code of Corporate Governance. It
identifies the main components of the Corporate Governance Framework which are in
place, including the system of internal control, and details the changes which have
taken place to the framework during 2021-22. 
2.7 The Statement also identifies improvement actions which are planned to the
governance framework during 2022-23. It concludes with an assurance statement by
the Leader of the Council and the Chief Executive. 
3. Proposals 
3.1 It is proposed that the Committee approves the draft Annual Governance Statement
which is attached at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 Approval of the Annual Governance Statement will ensure that the Council complies
with the requirements of the Local Authority Accounts (Scotland) Regulations 2014. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Good governance arrangements help to underpin the delivery of the Council’s key
priorities. 
Community Wealth Building 
4.7 None.
66

Page 67

5. Consultation 
5.1 No consultation has been required during the preparation of the Annual Governance
Statement. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
67

Page 68

Scope of Responsibility
North Ayrshire Council is responsible for ensuring that its business
is conducted in accordance with the law and proper standards,
and that public money is safeguarded and properly accounted for
and used economically, efficiently and effectively to achieve Best
Value.  
The Council is also responsible for putting in place proper
arrangements for the governance of its affairs and facilitating the
effective exercise of its functions, which includes arrangements for
the management of risk.
The Council has approved and adopted a Local Code of Corporate
Governance, which is consistent with the principles of the
CIPFA/SOLACE Framework ‘Delivering Good Governance in Local
Government’ (2016).  A copy of the local code is available on the
Council’s website, or a copy can be obtained from the Chief Executive’s
Service, North Ayrshire Council, Cunninghame House, Irvine KA12 8EE.
This statement explains how North Ayrshire Council complies with the Code of Corporate Governance
and meets the requirements of the ‘Code of Practice for Local Authority Accounting in the UK: A
Statement of Recommended Practice’, in relation to the Statement on the System of Internal Financial
Control. 
The Purpose of the Governance Framework
The governance framework comprises the systems and processes, and culture and values by which
the authority is directed and controlled.  It enables the authority to monitor the achievement of its
strategic objectives and to consider whether those objectives have led to the delivery of appropriate,
cost-effective services and the achievement of key outcomes.
The system of internal control is a significant part of that framework and is designed to manage risk to
a reasonable level.  The system of internal control is based on an ongoing process designed to
identify and prioritise the risks to the achievement of the Council’s objectives, to evaluate the
likelihood of those risks being realised and the impact should they be realised, and to manage them
effectively. 
The Governance Framework
The Council’s Framework is built around the seven core principles and 21 sub-principles that set out
the key building blocks of good governance:
Core Principle Sub Principles
A. Behaving with integrity, demonstrating
strong commitment to ethical values and
respecting the rule of law
 Behaving with integrity
 Demonstrating strong commitment to ethical
values
 Respecting the rule of law
B. Ensuring openness and comprehensive
stakeholder engagement
 Openness
 Engaging comprehensively with institutional
stakeholders
 Engaging with individual citizens and service
users effectively
C. Defining outcomes in terms of sustainable
economic, social, and environmental benefits
 Defining outcomes
 Sustainable economic, social and
environmental benefits
D. Determining the interventions necessary to
optimise the achievement of the intended
outcomes
 Determining interventions
 Planning interventions
 Optimising achievement of intended
outcomes
E. Developing the entity’s capacity, including
the capability of its leadership and the
individuals within it
 Developing the entity’s capacity
 Developing the capability of the entity’s
leadership and other individuals
Annual
Governance
Statement 
68

Page 69

Core Principle Sub Principles
F. Managing risks and performance through
robust internal control and strong public
financial management
 Managing risk
 Managing performance
 Robust internal control
 Managing data
 Strong public financial management
G. Implementing good practices in
transparency, reporting and audit to deliver
effective accountability
 Implementing good practice in transparency
 Implementing good practices in reporting
 Assurance and effective accountability 
The Code of Corporate Governance Statement 2021/22 was approved by the Audit and Scrutiny
Committee on 19 January 2022.  It aligns to the framework and demonstrates how the Council is
ensuring good governance and transparent accountability.
The key features of the governance framework that was in place during 2021/22 are below:
 The Cabinet was the key decision-making Committee, comprising the Leader of the Council,
the Depute Leader and members of the Administration, each with a specific portfolio of duties.
An Education Cabinet comprised the same members and included church and teaching
profession representatives. The Audit and Scrutiny Committee, which is chaired by an
opposition member, was in place to consider all matters in relation to Internal and External
Audit, Risk Management, Scrutiny and Performance, as well as receiving reports on the
findings of external scrutiny bodies. A ‘Policy Advisory Panel’ consisting of all elected
members assisted in the preparation of policy proposals for consideration and approval by
Cabinet.
 Strategic decision-making is governed by the Council’s key constitutional documents
including standing orders, scheme of administration, scheme of delegation to officers and
financial regulations and associated codes of financial practice.
 The Council has six Locality Partnerships, covering Irvine, Kilwinning, the Three Towns,
Arran, the North Coast and the Garnock Valley. Chaired by a local Elected Member, the
Partnerships provide the opportunity for Elected Members, Community Planning Partners and
local community representatives to consider the priorities for each area.
 The Council, together with NHS Ayrshire and Arran, established an integrated Health and
Social Care Partnership (HSCP), which has been in place since April 2015. The HSCP has
established a governance framework and an integrated senior management structure to
support delivery of its key objectives. 
 The Council’s mission, vision and key priorities are outlined in the Council Plan 2019-2024
which is underpinned by a delivery plan and a range of performance indicators. Regular
interim reports are provided on progress towards meeting the Council Plan priorities.
 A ‘People Strategy’ entitled ‘Our People Connect’ is in place to support the delivery of the
Council Plan and its strategic priorities by focussing on developing the right culture and
helping the Council transform to be a leaner, more efficient and higher performing
organisation where people can develop and thrive.
 The Performance Management Strategy 2021-24 focuses firmly on embedding a performance
management culture throughout the Council. Regular reporting to Elected Members takes
place and a wide range of performance information is available on the North Ayrshire
Performance Dashboard.
 The Council has adopted a ‘Code of Conduct’ for all its employees. Elected Members adhere
to the national ‘Code of Conduct for Councillors’ and a register of interests is in place.
 The approach to risk management is set out in the Risk Management Strategy: “Risk Focus”.
The Council’s strategic risk register is refreshed annually and for 2021/22 was approved by
Cabinet in February 2021.  A mid-year update was provided to the Audit and Scrutiny
Committee in November 2021.
 Each Head of Service has a Workforce Plan in place for their portfolio of services which
considers challenges and issues, the transformation agenda and to support career
development and succession planning.
 The Council has in place a development programme for all Elected Members. Leadership and
Development programmes are also established for strategic leaders and first line and middle
69

Page 70

managers across the Council, through the Leadership Academy approach.  A full Member’s
induction programme took place during May 2022 for all recently elected Members.
 The ‘Our Time to Talk’ approach is in place to ensure that managers and employees take
time to discuss how each employee is getting on at work; this focusses on the employee’s
contribution to the team, their wellbeing and any development needs that contribute towards
meeting the team’s objectives or the employee’s career aspirations.
 The ICT Asset Management Approach 2021-2024 supersedes the previous 2018-2021 plan. 
The approach is linked to the ICT Technology Strategy and depicts the impact on hardware,
software and application assets.  The Council’s approach to asset management planning is
based on CIPFA guidance which covers six core classes of assets: property, open space,
housing, roads, fleet, and ICT.
 A Capital Programme and Assets Group (CPAG), consisting of senior officers from across
Council services and chaired by the Head of Finance, is in place. This group monitors the
delivery of the Council’s capital programme, helping to ensure that projects are delivered on
time and within budget. The work of this group is supported by Service Project Boards.
 The Council has a long-term financial outlook, which covers the period 2021/22 to 2030/31.
This sets out the scale of the potential financial challenge and the approach to pro-actively
address it, ensuring financial sustainability of the Council.
 The Council has Internal Audit and Corporate Fraud teams to carry out independent and
objective reviews of governance and internal control arrangements and investigate allegations
of fraud and error both within and against the authority.
 An Information Governance framework is in place which complies with the General Data
Protection Regulation (GDPR), supported by a central team of staff within Democratic
Services. A corporate training module is in place to support ongoing training, development
and awareness.
 The Council has a robust Corporate Health, Safety and Wellbeing Policy to help ensure it
complies with health and safety legislation.
 An annual report is prepared for Cabinet by the Council’s statutory Chief Social Work Officer.
 The Council has a two-stage Complaints Procedure, which provides a transparent and
standardised process for customers who wish to complain and enables the Council to
manage complaints more effectively and to identify any service improvements which may be
required. 
The governance framework has been in place at North Ayrshire Council throughout the year ended
31st March 2022. 
The System of Internal Financial Control
The system of internal financial control is based on a framework of regular management information,
financial regulations, administrative procedures (including segregation of duties), management
supervision, and a system of delegation and accountability.  Development and maintenance of the
system is undertaken by Chief Officers within the Council.  In particular, the system includes:
 Financial regulations and codes of financial practice.
 Comprehensive budgeting systems.
 Regular reviews of periodic and annual financial reports that indicate financial performance
against the forecasts.
 Setting targets to measure financial and other performance.
 Clearly defined capital expenditure guidelines.
 Formal project management disciplines.
The Council’s financial management arrangements conform to the governance requirements of the
CIPFA statement on ‘The Role of the Chief Financial Officer in Local Government (2016)’.
Regarding the entities incorporated into the Group Accounts, the Council is not aware of any
weaknesses within their internal control systems and has placed reliance on the individual Statements
of Internal Financial Control where appropriate.
70

Page 71

Review of Effectiveness of the Governance Framework
North Ayrshire Council has responsibility for conducting, at least annually, a review of the
effectiveness of its governance framework including the system of internal control. The review of the
effectiveness of the framework is informed by the work of the Executive Leadership Team who have
responsibility for development and maintenance of the governance environment, the annual report by
the Senior Manager (Audit, Fraud, Safety and Insurance) and reports from the Council’s external
auditors Deloitte LLP, Audit Scotland and other review agencies.
The Section 95 Officer has overall responsibility for Internal Audit in North Ayrshire Council.  The
Senior Manager (Audit, Fraud, Safety and Insurance) is responsible for the management of the
section and reports directly to the Section 95 Officer on all audit matters, with the right of access to
the Chief Executive and Chair of the Audit and Scrutiny Committee. The Internal Audit section is fully
resourced to deliver its strategic audit plan and complies with the Public Sector Internal Audit
Standards (PSIAS) in conducting its audit work. Regular reports were made to the Council’s Audit and
Scrutiny Committee throughout 2021/22.
As detailed in the ‘Internal Audit Charter’ that has been adopted by the Council, the Internal Audit
function has independent responsibility for examining, evaluating, and reporting on the adequacy of
internal control.  The Senior Manager (Audit, Fraud, Safety and Insurance) prepares an annual report,
including an assurance statement containing a view on the adequacy and effectiveness of the
governance, risk management and internal control frameworks. This was reported to the Audit and
Scrutiny Committee on 31 May 2022.
The Internal Audit Annual Report 2021/22 highlights a number of findings by the Council’s Internal
Audit section which indicate some weaknesses in the internal control environment. Action plans are
put in place to address control weaknesses on conclusion of each audit and implementation of audit
actions is tracked on a quarterly basis by the Council’s Audit and Scrutiny Committee. None of these
are considered material enough to have a significant impact on the overall control environment and it
is the opinion of the Senior Manager (Audit, Fraud, Safety and Insurance) that the Council’s systems
of internal control continue to provide reasonable assurance against loss.
The Council’s internal audit arrangements conform to the governance requirements of the CIPFA
statement on ‘The Role of the Head of Internal Audit (2019)’. 
Significant Governance Developments during 2021/22
A Best Value Audit Review was conducted by Audit Scotland and Deloitte LLP in January and
February 2020. The report was presented to the Accounts Commission in June 2020 and to the
meeting of North Ayrshire Council in September 2020.  The report was extremely positive and
provided significant assurance that the Council complies with its statutory duty to secure Best Value. 
In March 2022, progress against the best value audit recommendations was reported to the meetings
of both North Ayrshire Council and the Audit and Scrutiny Committee.  The reports identify that the
four recommended actions are now complete.
A management restructure was carried out in the Place Directorate in December 2021 to better align
the Council’s structure to support the delivery of key transformational change in the areas of Land and
Property and sustainability and climate change, as set out in the Council’s ambitious Environmental
Sustainability and Climate Change Strategy 2021-2023.
Children’s Services Planning includes the Children’s Rights Report and the Child Poverty Action Plan,
all of which have been redeveloped for the three years 2020-23.
A Long-term Financial Outlook (covering the period 2021/22 to 2030/31) was approved by the Council
in December 2020.  This is underpinned by a Medium-term Financial Outlook which is updated
annually.  The most recent medium-term financial outlook, covering 2022/23-2024/25, was approved
by the Council in February 2022. These documents note the scale of the financial challenge which the
Council faces and underpin the development of a balanced budget. The Revenue Estimates 2022/23-
2024/25 and Capital Investment Programme 2022/23-2030/31 were approved by Council in March
2022.
To ensure ongoing compliance with Sections 193 and 194 of the Local Government (Scotland) Act
1973, the Council appointed the incoming Head of Democratic Services as its Proper Officer following
the retirement of the previous postholder.  The Head of Democratic Services was also appointed as
the Council’s Monitoring Officer in terms of Section 5 of the Local Government and Housing Act 1989. 
These appointments were effective from 19 July 2021.
71

Page 72

In terms of Section 3 of the Social Work (Scotland) Act 1968, and following the retirement of the
previous postholder, a new Chief Social Work Officer was appointed for the Council effective from 22
December 2021.
The Audit and Scrutiny Committee carried out a self-evaluation in August 2021, using best practice
frameworks and a toolkit prepared by officers to facilitate the process.  The actions arising from the
first self-evaluation in August 2019 were found to have been implemented. A small number of
improvement actions were identified during the 2021 process, which will now be conducted on an
annual basis.
The Growth and Investment Team was established within North Ayrshire Council in 2019 as part of an
organisational restructure to maximise the potential of major programmes of investments in North
Ayrshire, including capital projects funded through the Ayrshire Growth Deal.  A Growth and
Investment Governance Framework was approved by the Audit and Scrutiny Committee in June
2021. The framework sets out the arrangements to support internal programme and project
management procedures, and to provide robust and effective programme and project delivery
mechanisms.  As part of the annual monitoring of progress in delivering the Ayrshire Growth Deal, the
process will also consider any issues arising which may give rise to a need to update the governance
arrangements.
Extensive work took place with locality planning partnerships in 2021/22 to refresh locality partnership
priorities.  This led to the five mainland locality partnerships agreeing their ongoing priorities. Work on
the refresh of the Arran locality priorities is ongoing as this will consider the development of the Island
Plan approved by Cabinet in February 2022.
A Community Learning and Development Plan for 2021-2024 was approved by Cabinet in September
2021.  The plan sets out the governance arrangements to ensure the voices, needs and aspirations of
communities informs the operational delivery and targeting of resources.  The plan fits within the
landscape of Community and Locality Planning and in acknowledgement of these interdependencies
the governance arrangements include reporting to Community Planning and Locality Partnerships.
Under the Equalities Act 2010 and the Specific Duties (Scotland) Regulations 2012, the Council has a
duty to produce Equality Outcomes at least every four years. As part of the Council’s four-year review
of outcomes, Cabinet approved the Equality Outcomes for 2021-2025.
In November 2021, Cabinet approved the Council’s response to “A National Care Service for Scotland
– Consultation”.  The consultation followed on from a Scottish Government commissioned
Independent Review of Adult Social Care (IRASC) which proposed the creation of a national care
service (NCS) for Scotland. The Council’s consultation response was provided to the Scottish
Government on 2 November 2021 following engagement with Elected Members. 
Covid-19 Governance Arrangements
Council Committees continued to meet virtually throughout 2021/22. To ensure full public
transparency remained in place during this period, meetings were either broadcast live or recorded
and uploaded to allow the public to view proceedings while Covid-19 restrictions prevented physical
meetings with public attendance.
Throughout the pandemic the Emergency Management Team (EMT), chaired by the Chief Executive,
and attended by Executive Directors and Heads of Service, continued to meet. The Leader of the
Council attended these meetings as an observer.  The frequency of meetings reflected the needs of
Council services and partner organisations at various stages and pressure points during the
pandemic. 
Planned Actions for 2022/23
The Council has a number of planned actions for 2022/23 which will help to further strengthen the
governance framework:
 Progress the workstreams in the new Sustainable Change Programme for 2022/23 and
monitor and govern progress through the Transformation Board, chaired by the Chief
Executive.
 Developing and implementing processes and software which will enable ‘hybrid’ Committee
meetings to be held utilising both physical and remote attendance.
 With the local Council elections on 5 May 2022, formation of the new Council and elected
members. This will include a review of Council committee structures and elected member
representation.
72

Page 73

 Formation of a Vacancy Scrutiny Panel including the Executive Directors of Place and
Communities and the Head of Finance and Head of People and ICT. The main purpose is to
strengthen current workforce planning arrangements. 
Assurance
Subject to the above, and based on the assurances provided, we consider the governance and
internal control environment operating during 2021/22 to provide reasonable and objective assurance
that any significant risks impacting on the achievement of our actions will be identified and actions
taken to avoid or mitigate their impact. Systems are in place to continually review and improve the
governance and internal control environment and action plans are in place to address identified areas
for improvement. 
Craig Hatton Councillor Marie Burns
Chief Executive Leader of the Council
May 2022 May 2022 
73

Page 74

74

Page 75

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Accounting Policies 2021/22 
Purpose:  To seek the Audit and Scrutiny Committee’s approval of the
accounting policies which will be adopted in the preparation of
the Council’s annual accounts for the year to 31 March 2022. 
Recommendation:  That the Audit and Scrutiny Committee approves the accounting
policies as detailed in Appendix 1. 
1. Executive Summary 
1.1 The annual accounts for the 2021/22 financial year summarise the Council
transactions during the year and its position at the year end of 31 March 2022. Under
the Local Authority Accounts (Scotland) Regulations 2014, the Council is required to
prepare an annual Statement of Accounts and Section 12 of the Local Government in
Scotland Act 2003 requires that these accounts are prepared in accordance with the
proper accounting practices. 
1.2 These practices primarily comprise the Code of Practice on Local Authority
Accounting in the United Kingdom 2021/22 (“the Code”), supported by International
Financial Reporting Standards (IFRS). These are issued jointly by the Chartered
Institute of Public Finance and Accountancy (CIPFA) and the Local Authority
(Scotland) Accounts Advisory Committee (LASAAC) and are designed to give a “true
and fair view” of the financial performance of the Council. 
1.3 The accounting policies to be adopted by North Ayrshire Council are reviewed on an
annual basis in line with the CIPFA Code and submitted to the Audit and Scrutiny
Committee for review in advance of the financial statements being prepared. 
1.4 There have been no material changes to the accounting policies for 2021/22. 
1.5 Pending confirmation of revised guidance from CIPFA / LASAAC, it is proposed that 
the preparations for the adoption of IFRS 16 Leases proceed with a view to
implementing the required changes from 1 April 2022. 
Agenda Item 6
75

Page 76

2. Background 
2.1 Accounting policies are defined in paragraph 3.3.2.1 of the Code as ‘the specific
principles, bases, conventions, rules and practices applied by an authority in preparing
and presenting financial statements’. 
2.2  Councils are required to select accounting policies and apply changes to accounting
policies in accordance with International Accounting Standard 8 - Accounting Policies. 
2.3  The Council is required to adopt the accounting policies most appropriate to its
particular circumstances for the purpose of giving a true and fair view. The accounting
policies adopted should be reviewed regularly to ensure that they remain appropriate
and consider the required treatment of any new policies relevant to the Council’s
particular circumstances. Sufficient information should be disclosed in the financial
statements to enable users to understand the accounting policies adopted and how
they have been implemented. 
2.4  The draft accounting policies proposed for adoption are detailed in Appendix 1. 
2.5 CIPFA / LASAAC had previously announced changes to the treatment of leases and
similar arrangements in line with International Financial Reporting Standard (IFRS) 16
Leases with effect from 1 April 2022. In response to concerns raised in relation to
issues arising in England and Wales, CIPFA / LASAAC has announced that the
mandatory adoption of this standard will be postponed until 1 April 2024. However
draft guidance has suggested that local authorities are encouraged to adopt this
standard early, where appropriate. Pending confirmation of the final guidance from
CIPFA / LASAAC, it is proposed that North Ayrshire Council continues with its ongoing
preparations for the adoption of this standard from 1 April 2022. 
2.6 IFRS 16 introduces a single lessee accounting model which seeks to improve
comparability between leased and purchased assets operated by Councils. Under the
new standard, the Council is required to recognise all right of use assets and lease
liabilities, with the exception of short-term (less than 12 months) and low value leases
(less than £10,000), on the balance sheet. 
2.7 IFRS 16 will be adopted without retrospective restatement: this means that when it is
implemented in 2022/23, the Council will recognise the cumulative impact of applying
the standard as at 1 April 2022, with all adjustments to opening balances at that date
taken through the General Fund. Officers are in the process of quantifying the
implications of this standard. However, North Ayrshire Council’s operating lease
obligations are not extensive and the adjustments to the opening balances are not
expected to be material. 
3. Proposals 
3.1 It is proposed that the Audit and Scrutiny Committee approves the accounting policies
as detailed in Appendix 1 
76

Page 77

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by maximising resources
and providing value for money to support financially sustainable delivery models. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation was required in the preparation of this report. 
Mark Boyd
Head of Service (Finance 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
None
77

Page 78

Appendix 1 
Accounting Policies 2021-22 
General Principles 
The Accounts summarise the Council’s transactions for the 2021-22 financial year and its position at
the year-end of 31 March 2022.  The Council is required to prepare an annual Statement of Accounts
by the Local Authority Accounts (Scotland) Regulations 2014 and Section 12 of the Local Government
in Scotland Act 2003 requires that they are prepared in accordance with proper accounting practices. 
These practices under Section 21 of the 2003 Act primarily comprise the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22, supported by International Financial Reporting
Standards (IFRS) and statutory guidance under Section 12 of the 2003 Act. 
The accounting convention adopted in the financial statements is principally historical cost, modified
by the revaluation of certain categories of non-current assets and financial instruments. 
A Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are made or
received. In particular: 
• Revenue from contracts with service recipients, whether for services or the provision of goods, is
recognised when (or as) the goods or services are transferred to the service recipient in
accordance with the performance obligations of the contract.
• Supplies are recorded as expenditure when they are consumed. Where there is a gap between the
date supplies are received and their consumption, they are carried as inventories on the Balance
Sheet.
• Expenses in relation to services received (including services provided by employees) are recorded
as expenditure when the services are received rather than when payments are made.
• Interest payable on borrowings and receivable on investments is accounted for on the basis of the
effective interest rate for the relevant financial instrument rather than the cash flows fixed or
determined by the contract. 
• Suppliers’ invoices paid in the two weeks following the year-end have been included together with
specific accruals in respect of further material items, provided the goods and services were
received prior to 31 March. 
• Where revenue and expenditure have been recognised but cash has not been received or paid, a
debtor or creditor for the relevant amount is recorded in the Balance Sheet.  The de minimis level
for recognition of such transactions has been agreed at £5,000, therefore all known transactions of
£5,000 or above have been included. 
• Where debts may not be settled, the balance of debtors is written down and a charge made to
revenue for the income that might not be collected. 
B  Allocation of Central Support Costs and Recharges to Capital
A proportion of net central support services is allocated to services outwith the general fund. The
balance of the net central support services is reported on the basis of how the services are structured
and how the Council operates, monitors and manages financial performance. 
C Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty
on notice of not more than 24 hours.  Cash equivalents are investments that mature in three months
or less from the date of acquisition and that are readily convertible to known amounts of cash with
insignificant risk of change in value. 
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are
repayable on demand and form an integral part of the Council’s cash management. 
D Prior Period Adjustments, Changes in Accounting Policies and Estimates and Errors
Prior period adjustments may arise as a result of a change in accounting policies or to correct a
material error. Changes in accounting estimates are accounted for prospectively, i.e. in the current
and future years affected by the change and do not give rise to a prior period adjustment. 
78

Page 79

Appendix 1 
Changes in accounting policies are only made when required by proper accounting practices or the
change provides more reliable or relevant information about the effect of transactions, other events
and conditions on the Council’s financial position or performance. When a change is made, it is
applied retrospectively (unless otherwise stated) by adjusting opening balances and comparative
amounts for the prior period as if the new policy had always been applied. 
Material errors discovered in prior years are corrected retrospectively by amending opening balances
and comparative amounts for the prior period. 
E Charges to Revenue for Non-Current Assets
Services are charged with the following amounts to record the cost of holding non-current assets
during the year: 
• Depreciation attributable to the assets used by the relevant service;
• Revaluation and impairment losses on assets used by the service where there are no accumulated
gains in the Revaluation Reserve against which the losses can be written off; and 
• Amortisation of intangible fixed assets attributable to the service. 
The Council is not required to raise council tax to cover depreciation, revaluation and impairments
losses or amortisation. However, it is required to make an annual contribution from revenue towards
the reduction in its overall borrowing requirement, equal to an amount calculated on a prudent basis
determined by the Council in accordance with the Statutory Repayment of Loans Fund Advances.
This is known as the Loans Fund Principal Repayment. Depreciation, revaluation and impairment
losses and amortisation are replaced by the Loans Fund Principal Repayments in the General Fund
Balance by way of an adjusting transaction within the Capital Adjustment Account in the Movement in
Reserves Statement for the difference between the two. 
F Employee Benefits 
Benefits Payable during Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the year end.
They include such benefits as salaries, wages, overtime and paid annual leave for current employees
and are recognised as an expense in the year in which employees render service to the Council.  All
salaries and wages earned up to 31 March are included in the financial statements irrespective of
when the payment was made. An accrual is made for the cost of holiday entitlements earned by
employees but not taken before the year-end and which employees can carry forward into the next
financial year.  The accrual is made at the wage and salary rates applicable in the following year,
being the period in which the benefits will be taken. Such accruals are required, under statute, to be
reversed out of the General Fund Balance by a credit to the Accumulating Compensated Absences
Adjustment Account in the Movement in Reserves Statement. 
Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an
officer’s employment before the normal retirement date or an officer’s decision to accept voluntary
redundancy. They are charged on an accruals basis to the relevant services line in the CIES at the
point when the offer of termination can no longer be withdrawn by the Council. Where termination
benefits include the enhancement of pensions, the General Fund balance is charged with the amount
payable by the Council to the pension fund or pensioner in the year. 
Post-Employment Benefits
The Council participates in two separate pension schemes: 
• The Scottish Teachers’ Pension Scheme administered by the Scottish Government; and
• The Local Government (Scotland) Pension Scheme administered by the Strathclyde Pension
Fund.  
79

Page 80

Appendix 1 
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned
while employees work for the Council.  However, the arrangements for the teachers’ scheme mean
that liabilities for these benefits cannot be identified specifically to the Council.  The scheme is
therefore accounted for as if it were a defined contributions scheme.  No liability for future payments
of benefits is recognised in the Balance Sheet and the Education and Youth Employment services line
in the CIES is charged with the employer’s contributions payable to the Teachers’ Pension Scheme in
the year. 
The Local Government Pension Scheme
The Local Government Pension Scheme (LGPS) is accounted for as a defined benefits scheme. 
The liabilities of Strathclyde Pension Fund attributable to the Council are included in the Balance
Sheet on an actuarial basis using the ‘projected credit unit method’, i.e. an assessment of the future
payments that will be made in relation to retirement benefits earned to date by employees, based on
assumptions about mortality rates, employee turnover rates, etc., and projected earnings for current
employees. 
Liabilities are discounted to their value at current prices, using a discount rate as advised by the
actuaries, Hymans Robertson. 
The assets of Strathclyde Pension Fund attributable to North Ayrshire Council are included in the
Balance Sheet at their fair value: 
• Quoted securities – current bid price;
• Unquoted securities – professional estimate;
• Unitised securities – current bid price; and 
• Property – market value. 
The change in the net pension liability is analysed into the following components: 
Service Costs:
• Current service cost – the increase in liabilities as a result of service earned by employees this
year. This is allocated in the CIES to the services for which the employees worked.
• Past service cost (including curtailments) – the increase in liabilities as a result changes to the
scheme, including amendments or curtailments, where the changes impact on the service earned
by employees in previous years. These costs are charged to the Surplus or Deficit on the Provision
of Services in the CIES. 
• Net interest on the net defined benefit liability (asset), i.e. net interest expense for the Council – the
change during the period in the net defined benefit liability or asset that arises from the passage of
time. This is charged to the Financing and Investment Income and Expenditure line in the CIES,
calculated by applying the discount rate used to measurement the defined benefit obligation at the
beginning of the period – taking into account any changes in the net defined benefit liability or
asset during the period as a result of contribution and benefit payments. 
Remeasurements:
• Return on plan assets – excludes amounts included in net interest on the net defined liability
(asset). This is charged to the Pensions Reserve as Other Comprehensive Income and
Expenditure.
• Actuarial gains and losses – changes in the net pensions liability that arise because events have
not coincided with assumptions made at the last actuarial valuation or because the actuaries have
updated their assumptions. This is charged to the Pensions Reserve as Other Comprehensive
Income and Expenditure.
• Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s contributions to the
pension fund in settlement of liabilities. This is not accounted for as an expense. 
80

Page 81

Appendix 1 
Statutory provisions require the General Fund balance to be charged with the amount payable by the
Council to the pension fund or directly to pensioners in the year, not the amount calculated according
to the relevant accounting standards.  In the Movement in Reserves Statement, this means that there
are transfers to and from the Pensions Reserve to remove the notional debits and credits for
retirement or pension enhancement termination benefits and replace them with charges for the cash
paid to the pension fund and pensioners and any such amounts payable but unpaid at the year-end. 
The negative balance that arises on the Pensions Reserve thereby measures the beneficial impact on
the General Fund of being required to account for retirement benefits on the basis of cash flows rather
than as benefits earned by employees. 
Discretionary Benefits
The Council also has restricted powers to make discretionary awards to retirement benefits in the
event of early retirements. Any liabilities estimated to arise as a result of an award to any member of
staff, including teachers, are accrued in the year of the decision to make the award and accounted for
using the same policies as are applied to the Local Government Pension Scheme. 
G Events After the Reporting Period 
These are events, both favourable and unfavourable, that occur between the end of the reporting
period (31 March) and the date when the financial statements are authorised for issue.   
The Statement of Accounts are adjusted to reflect events where they provide evidence of conditions
that existed at the end of the reporting period. 
Where events indicate conditions, which arose after the reporting period, which would have had a
material effect, the Statement of Accounts are not adjusted but a disclosure is made in the notes of
the nature of the event and the estimated financial effect. 
Events taking place after the date of authorisation for issue are not reflected in the Statement of
Accounts. 
H Financial Instruments
Financial Liabilities
Financial liabilities are recognised on the balance sheet when the Council becomes party to the
contractual provisions of a financial liability. Liabilities are initially measured at fair value and then
carried at amortised cost.  Annual charges to the Financing and Investment Income and Expenditure
line in the CIES for interest payable are based on the carrying amount of the liability, multiplied by the
effective interest rate of the instrument. The effective interest rate is the rate that exactly discounts
estimated future cash payments over the life of the instrument to the amount at which it was originally
recognised. 
For most of the borrowings that the Council has, this means that the amount presented in the balance
sheet is the outstanding principal repayable (plus accrued interest) and interest charged to the CIES
is the amount payable for the year according to the loan agreement. 
Costs associated with debt restructuring (premiums and discounts) are charged to the Financing and
Investment Income and Expenditure line in the CIES in the year of repayment of the original debt in
accordance with accounting regulations. 
Where premiums and discounts have been charged to the CIES, regulations permit the costs of
restructuring to be released to revenue over the period of the replacement loan.  The reconciliation of
amounts charged to the CIES to the net charge required against the General Fund balance is
managed by a transfer to or from the Financial Instruments Adjustment Account in the Movement in
Reserves Statement. 
Financial Assets
Financial assets are classified and measured based on the reasons, or business model, for holding
the financial assets and the characteristics of the anticipated cash flows. There are three main
classes of financial assets measured at: 
81

Page 82

Appendix 1 
• Amortised cost;
• Fair value through profit or loss (FVPL); and
• Fair value through other comprehensive income (FVOCI). 
The Council’s business model is to hold assets to collect contractual cash flows and our financial
assets are therefore classified as amortised cost. 
Financial Assets Measured at Amortised Cost
Financial assets measured at amortised costs are recognised on the Balance Sheet when the Council
becomes party to the contractual provisions of a financial asset and are initially measured at fair value
and then carried at amortised cost. Annual credits to the Financing and Investment Income and
Expenditure line in the CIES for interest receivable are based on the carrying amount of the asset
multiplied by the effective rate of interest for the instrument. For most of the financial assets held by
the Council, this means that the amount presented in the Balance Sheet is the outstanding principal
receivable (plus accrued interest) and interest credited to the CIES is the amount receivable for the
year in the loan agreement. 
However, the Council has made a loan to a charitable body at less than market rates (soft loan).
When a soft loan is made, a loss is recorded in the CIES (charged to the appropriate service) for the
present value of the interest that will be foregone over the life of the loan, resulting in a lower
amortised cost than the outstanding principal. The value of the interest foregone is then added back
amortised back to the amortised cost of the loan on the Balance Sheet and credited to the Financing
and Investment Income and Expenditure line in the CIES on an annual basis until the loan is repaid. 
Any gains or losses which arise on the derecognition of an asset are credited or debited to the
Financing and Investment Income and Expenditure line in the CIES. 
Expected Credit Loss Model
Potential impairment losses on Financial Assets Measured at Amortised Cost are determined using
the Expected Credit Loss Model. 
Impairment losses are calculated to reflect the expectation that the future cash flows may not take
place because the borrower may default on their obligations. Credit risk plays a crucial part in
assessing the potential losses. Where risk has increased significantly since an asset was recognised,
losses are assessed on a lifetime basis. Where risk has not increased significantly or remains low,
losses are assessed on the basis of 12-month expected losses. 
The Council recognises expected credit losses on all of its financial assets held at amortised cost,
either on a 12-month or lifetime basis. Only lifetime losses are recognised for trade receivables
(debtors). 
For any identified impairment losses, a charge is made to the Financing and Investment Income and
Expenditure line in the CIES.   
Financial Assets Measured at Fair Value through Profit and Loss
Financial Assets that are measured at FVPL are recognised on the Balance Sheet when the Council
becomes party to the contractual provisions of a financial asset and are initially measured and carried
at fair value. Fair value gains and losses are recognised in the Surplus or Deficit on the Provision of
Services as they emerge. 
Fair value measurements of the financial assets are based on the following techniques: 
• Instrument with quoted market process – the market price; and
• Other instruments with fixed and determinable payments – discounted cash flow analysis. 
Any gains and losses which arise on the derecognition of the asset are credited or debited to the
Financing and Investment Income and Expenditure line in the CIES. 
The Council does not currently have any Financial Assets measured at Fair value through Profit and
Loss.
82

Page 83

Appendix 1 
I Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party
contributions and donations are recognised as due to the Council when there is reasonable
assurance that: 
• The Council will comply with the conditions attached to the payments, and
• The grants or contributions will be received. 
Amounts recognised as due to the Council are not credited to the CIES until conditions attached to
the grant have been satisfied. 
Monies advanced as grants and contributions for which conditions have not been satisfied are carried
in the Balance Sheet as creditors.  When conditions are satisfied, the grant or contribution is credited
to the relevant service line (for revenue grants) or Taxation and Non-Specific Grant Income (for non-
ring-fenced revenue grants and all capital grants). 
Capital grants are then reversed out of the General Fund Balance in the Movement in Reserves
Statement. Where the grant has yet to be used to finance capital expenditure, it is posted to the
Capital Grants Unapplied Account.   
Capital grants which are used and amounts previously posted to the Capital Grants Unapplied
Account which have now been applied, are transferred to the Capital Adjustment Account. 
J  Heritage Assets 
A heritage asset is defined as a tangible asset with historical, artistic, scientific, technological,
geophysical or environmental qualities that is held and maintained principally for its contribution to
knowledge and culture. 
The Council holds heritage assets consisting of civic regalia and silverware, historical artefacts, fine
art and public artworks. The assets are held at valuation and no depreciation is charged on the
assets. Expenditure to maintain the assets is written off to the Comprehensive Income and
Expenditure Statement (CIES) in the year of expenditure. Donated heritage assets are reflected in the
balance sheet at valuation with a gain equivalent to the value of the asset reported in the CIES in the
year of donation. 
Measurement
The Council’s heritage assets are recognised on the Balance Sheet at values determined by
specialist external valuers and by experienced officers within the Connected Communities service. 
Valuations have been largely undertaken on an insurance basis at retail level.  Only items deemed to
have a value of £10,000 and above have been disclosed in the Balance Sheet.   
Disclosure
Not all of the Council’s identified heritage assets will be disclosed in the Balance Sheet.  It is not
deemed practicable to obtain external valuations for all items defined as heritage assets.  These
include: Museum and Gallery items with a value of less than £10,000; Castles; Monuments and War
Memorials. 
K Intangible Assets 
Expenditure on non-monetary assets that do not have physical substance but are controlled by the
Council as a result of past events (e.g. software licences) is capitalised when it is expected that it will
bring benefits to the Council for more than twelve months. Intangible assets are measured initially at
cost.  Amounts are not revalued, as the fair value of the assets held by the Council cannot be
determined by reference to an active market.  The depreciable amount of an intangible asset is
amortised over its useful life (generally between 5 and 10 years) to the relevant service line(s) in the
CIES.   
L  Interest in Companies and Other Entities
The Council has interests in companies and other entities which have the nature of subsidiaries,
associates and joint ventures and require it to prepare group accounts. In the Council’s single entity
accounts, these interests are recorded as financial assets at cost, less any provision for losses.
83

Page 84

Appendix 1 
M  Internal Transactions
Internal transactions between operational segments of the Council are included within the
management accounts for budgetary control purposes only. All internal transactions between services
have been excluded from the service expenditure analysis within the Comprehensive Income and
Expenditure Statement resulting in reductions in both the gross expenditure and gross income
reported, with no overall net impact. 
N Inventories 
Inventories include consumable stock and work-in-progress and are recognised in the Balance Sheet
at the lower of cost and net realisable value. The valuation of work-in-progress has been made at cost
plus an appropriate proportion of overheads, together with attributable profits and allowances for
foreseeable losses. 
O Investment Properties 
Investment properties are those that are used solely to earn rentals and/or for capital appreciation.
Investment properties are measured initially at cost and subsequently at fair value, being the price
that would be received to sell such an asset in an orderly transaction between market participants at
the measurement date. As a non-financial asset, investment properties are measured at highest and
best use. Properties are not depreciated but reviewed annually and revalued regularly to ensure their
carrying value reflects market conditions at the year-end.   
P Leases 
Leases are classified as finance leases where the terms of the lease transfer substantially all the risks
and rewards incidental to ownership of the property from the lessor to the lessee.  All other leases are
classified as operating leases. Where a lease covers both land and buildings, the land and buildings
elements are considered separately for classification. 
The Council as Lessee
North Ayrshire Council currently has no finance leases where the Council is the lessee. 
Rentals paid under operating leases, for vehicles and plant, are charged to the appropriate service
account in the CIES as an expense of the services benefiting for use of the leased equipment. 
The Council as Lessor
North Ayrshire Council has no finance leases where the Council is the lessor.   
The Council rents out property on cancellable operating leases only.  Where the Council grants an
operating lease over a property or an item of plant or equipment, the asset is retained in the Balance
Sheet.   
Q Property, Plant and Equipment 
Assets that have physical substance and are held for use in the supply of services, for rental to
others, or for administrative purposes and that are expected to be used during more than one
financial year are classified as Property, Plant and Equipment. 
All valuations of land and buildings are carried out by Royal Institution of Chartered Surveyors (RICS)
qualified valuers, with the exception of valuations of council dwellings which are based on beacon
values calculated by the District Valuer. Both valuations are in accordance with the methodologies
and bases of estimation as set out in the professional standards of RICS. 
Recognition
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is
capitalised on an accruals basis. Expenditure that merely maintains the condition of an asset (i.e.
repairs and maintenance) is charged as an expense when it is incurred.   
The Council has a de minimis level of £10,000 for expenditure to be classed as capital.  Land and
Buildings with a valuation below £10,000 are not recognised on the Council Balance Sheet. 
Measurement
Assets are initially measured at cost, comprising:
84

Page 85

Appendix 1 
• The purchase price; and 
• Any costs attributable to bringing the asset to the location and condition necessary for it to be
capable of operating in the manner intended. 
The Council does not capitalise borrowing costs incurred whilst assets are under construction. 
The cost of assets acquired other than by purchase is deemed to be its fair value. 
Assets are carried on the Balance Sheet using the following measurement bases: 
• Council Dwellings - Fair value, determined using the basis of existing use value for social housing
(EUV-SH);
• Other Land and Buildings - Fair value, determined by the amount that would be paid for the asset
in its existing use (existing use value - EUV).  
• Vehicles, Plant and Equipment - depreciated historical cost
• Infrastructure Assets - depreciated historical cost
• Community Assets - depreciated historical cost
• Surplus Assets - fair value based on market value in highest and best use
• Assets Under Construction - historical cost
• Investment Properties (Common Good and Trusts only) - fair value based on market value in
highest and best use 
Where there is no market-based evidence of fair value because of the specialist nature of an asset,
depreciated replacement cost is used as an estimate of fair value.
Assets included in the Balance Sheet at fair value are revalued on a rolling 5-year programme, with
the exception of Surplus Assets and Investment Properties which are revalued annually.  Increases in
valuations are matched by credits to the Revaluation Reserve to recognise unrealised gains. 
Where decreases in value are identified, the revaluation loss is accounted for as follows: 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains);
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the CIES. 
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of
its formal implementation.  Gains arising before that date have been consolidated into the Capital
Adjustment Account. 
Impairment
Assets are assessed at each year-end to establish whether there is any indication that an asset may
be impaired.  Where indications exist, and any possible differences are estimated to be material, the
recoverable amount of the asset is estimated and, where this is less than the carrying amount of the
asset, an impairment loss is recognised for the shortfall. 
Where impairment losses are identified, they are accounted for as follows: 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains);
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the CIES.
Where an impairment loss is subsequently reversed, the reversal is credited to the relevant service
line(s) in the CIES, up to the amount of the original loss, adjusted for depreciation that would have
been charged if the loss had not been recognised. 
85

Page 86

Appendix 1 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets. An exception is made for
assets without a determinable finite useful life (i.e. freehold land and certain Community Assets) and
assets that are not yet available for use (i.e. assets under construction).  Investment Properties and
Assets Held for Sale are not subject to depreciation. 
Depreciation is charged on a straight-line basis over the useful life of the assets (as advised by a
suitably qualified officer).  Depreciation is charged in the year of acquisition but not in the year of sale. 
Where a Property, Plant and Equipment asset has major components whose cost is significant in
relation to the total cost of the item, the components are depreciated separately. For the purposes of
component accounting the Council considers significant components being those with a cost that is at
least 20% of the overall cost of the asset.  Individual assets shall be disregarded for component
accounting where their carrying value is below £2m. 
Revaluation gains are also depreciated, with an amount equal to the difference between current value
depreciation charged on assets and the depreciation that would have been chargeable based on their
historical cost being transferred each year from the Revaluation Reserve to the Capital Adjustment
Account. 
Disposals
When it becomes probable that the carrying amount of an asset will be recovered principally through
a sale transaction rather than through its continuing use, it is reclassified as an Asset Held for Sale. 
The asset is revalued immediately before reclassification and then carried at the lower of this amount
and fair value less costs to sell.  Where there is a subsequent decrease to fair value less costs to sell,
the loss is posted to the Other Operating Expenditure line in the CIES.  Gains in fair value are
recognised only up to the amount of any previously recognised losses.  Depreciation is not charged
on Assets Held for Sale. 
Property, land and buildings are classified as ‘held for sale’ when the following criteria are met: 
• The property is available for sale in its present condition;
• The sale is highly probable;
• The asset is being actively marketed for sale at a price that is reasonable in relation to its current
fair value;
• The sale is expected to qualify for recognition as a completed sale within one year. 
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance
Sheet is written off to the Other Operating Expenditure line in the CIES as part of the gain or loss on
disposal.  Receipts from disposals are credited to the same line in the CIES as part of the gain or loss
on disposal.  Any revaluation gains accumulated for the asset in the Revaluation Reserve are
transferred to the Capital Adjustment Account. 
To comply with statutory guidance, this gain or loss is excluded when determining the General Fund
balance within the Movement in Reserves Statement. 
R Public Private Partnership (PPP) / NPD and similar contracts 
PPP / NPD and similar contracts are agreements to receive services, where the responsibility for
making available the property, plant and equipment needed to provide the services passes to the PPP
/ NPD contractor.  As the Council is deemed to control the services that are provided under its PPP /
NPD schemes and as ownership of the property, plant and equipment will pass to the Council at the
end of the contracts for no additional charge, the Council carries the assets used under the contracts
on its Balance Sheet as part of Property, Plant and Equipment. 
The original recognition of these assets at fair value (based on the cost to purchase the property,
plant and equipment) was balanced by the recognition of a liability for amounts due to the scheme
operator to pay for the capital investment.  For North Ayrshire Council Schools PPP contract, the
liability was written down by an initial capital contribution of £1.743 million. 
The amounts payable to the PPP/ NPD operators each year are analysed into four elements:
86

Page 87

Appendix 1 
• Service charges and lifecycle replacement costs – value of services including cleaning and
janitorial services, repairs and maintenance, energy, non domestic rates and insurances debited to
the relevant service in the CIES;
• Interest payments – the interest charge on the outstanding Balance Sheet liability, debited to the
Financing and Investment Income and Expenditure line in the CIES;
• Contingent rent – increases in the amount to be paid for the property arising during the contract,
debited to the Financing and Investment Income and Expenditure line in the CIES;
• Liability repayment– repayment of the principal owed to the PPP operator, applied to write down
the Balance Sheet liability. 
S Provisions, Contingent Liabilities and Contingent Assets 
Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential,
and a reliable estimate can be made of the amount of the obligation.  For instance, the Council may
be involved in a court case that could eventually result in the making of a settlement or the payment of
compensation. 
Provisions are charged as an expense to the appropriate service line in the CIES in the year that the
Council becomes aware of the obligation, and measured at the best estimate, at the balance sheet
date, of the expenditure required to settle the obligation, taking into account relevant risks and
uncertainties. 
When payments are eventually made, they are charged to the provision carried in the balance sheet. 
Estimated settlements are reviewed at the end of each financial year; where it becomes less than
probable that a transfer of economic benefits will be required (or a lower settlement than anticipated is
made); the provision is reversed and credited back to the relevant service. 
Where some or all of the payment required to settle a provision is expected to be recovered from
another party (e.g. from an insurance claim), this is only recognised as income for the relevant service
if it is virtually certain that reimbursement will be received if the Council settles the obligation. 
Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible
obligation, whose existence will only be confirmed by the occurrence or otherwise of uncertain future
events not wholly within the control of the Council.  Contingent liabilities also arise in circumstances
where a provision would otherwise be made but either it is not definite that an outflow of resources will
be required, or the amount of the obligation cannot be measured reliably. 
Contingent liabilities are not recognised in the balance sheet but disclosed in a note to the accounts. 
Contingent Assets
A contingent asset arises where an event has taken place that gives the Council a possible asset
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council. 
Contingent assets are not recognised in the balance sheet but disclosed in a note to the accounts
where it is probable that there will be an inflow of economic benefits or service potential. 
T Reserves 
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in
Reserves Statement.  When expenditure to be financed from a reserve is incurred, it is charged to the
appropriate service in that year to score against the Surplus/Deficit on the Provision of Services in the
CIES.  The reserve is then appropriated back into the General Fund Balance in the Movement in
Reserves Statement so that there is no net charge against council tax for the expenditure. 
Certain reserves are kept to manage the accounting processes for non-current assets, financial
instruments and retirement benefits and do not represent usable resources for the Council; these
reserves are explained in the relevant notes. 
87

Page 88

Appendix 1 
U Revenue Expenditure Funded from Capital Under Statute 
Expenditure incurred during the year that may be capitalised under statutory provisions but does not
result in the creation of a non-current asset is charged as expenditure to the relevant service in the
CIES in the year.  Where the Council has determined to meet the cost of this expenditure from
existing capital resources or by borrowing, a transfer in the Movement in Reserves Statement from
the General Fund Balance to the Capital Adjustment Account then reverses out the amounts charged
so that there is no impact on the level of council tax. 
V VAT 
All income and expenditure excludes amounts relating to VAT, as all VAT collected is payable to HM
Revenue and Customs and net VAT paid is fully recoverable by the Council. 
W Fair Value Measurement 
The Council values some of its non-financial assets, such as Surplus Assets and Investment
Properties (Common Good Funds and Trusts only), and some of its financial instruments at Fair
Value.  Fair Value is the price that would be received either on the sale of an asset or to transfer a
liability in an orderly transaction between market participants at the measurement date.  The Fair
Value measurement assumes that the transaction to sell the asset or transfer the liability takes place
either: 
• In the principal market for the asset; or
• In the absence of a principal market, in the most advantageous market for the asset. 
The Council measures the Fair Value of an asset or liability using the assumptions that market
participants would use when pricing the asset or liability, assuming that market participants act in their
economic best interest. 
When measuring the Fair Value of a non-financial asset, the Council takes into account a market
participant’s ability to generate economic benefits by using the asset in its highest and best use or by
selling it to another market participant that would use the asset in its highest and best use. The
Council uses valuation techniques that are appropriate in the circumstances and for which sufficient
data is available, maximising the use of relevant observable inputs and minimising the use of
unobservable inputs. 
Inputs to the valuation techniques in respect of assets and liabilities for which Fair Value is measured
or disclosed in the Council’s financial statements are categorised within the fair value hierarchy, as
follows: 
• Level 1 – quoted prices (unadjusted) in active markets for identical assets or liabilities that the
Council can access at the measurement date;
• Level 2 – inputs other than quoted prices included within Level 1 that are observable for the asset
or liability, either directly or indirectly
• Level 3 – unobservable inputs for the asset or liability. 
88

Page 89

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Corporate Fraud Team Annual Report 2021/22 
Purpose:  To provide the Audit and Scrutiny Committee with an update
report on the work of the Corporate Fraud Team during
2021/22. 
Recommendation:  That the Committee notes the work carried out by the Corporate
Fraud Team. 
1. Executive Summary 
1.1 The Corporate Fraud Team provides the Council with the capacity to investigate fraud
both within and against the organisation. 
1.2 Committee receives bi-annual updates on the work of the team. A mid-year update for
2021/22 was provided in November 2021 and this report provides an overview of the
key achievements during the full year. 
2. Background 
Investigation Work 
2.1 Referrals for investigation have been made to the team from a number of different
sources, including Revenues and Benefits and Housing, members of the public and
other agencies and local authorities. The publicity used by the team, including posters
and leaflets, advertising on Council vans and contact information on the Council
website, continues to be successful in generating a stream of referrals. 
2.2 Investigations have been carried out across a range of areas including employee-
related matters as well as Council Tax, Discretionary Housing Payments, Scottish
Welfare Fund, Blue Badges and Housing tenancy issues. Although responsibility for
investigating Housing Benefit fraud now lies with the DWP Single Fraud Investigation
Service (SFIS), issues may be identified by the Corporate Fraud Team which can
result in changes being made to benefits in payment. Joint working with the DWP
paused during the COVID-19 pandemic, however DWP have intimated that they will
be looking to recommence this work.  This formal joint working arrangement is in place
for cases where there are suspected frauds relating to both DWP benefits and Council
Tax Reduction. 
Agenda Item 7
89

Page 90

2.3 The team investigates all tenancy abandonments which are referred by Housing.
While Housing focus on recovering the tenancy, the Corporate Fraud Team can add
value by locating the missing tenant, which can often lead to changes to benefits or
discounts in payment elsewhere, as well as enabling Housing to recover costs
associated with house clearances and cleaning. 
2.4 Employee-related investigations are the subject of a separate report to the appropriate
Service and the findings are also reported to the Audit and Scrutiny Committee as
each investigation is finalised. 
Outcomes 2021/22 
2.5 The team received 280 referrals for investigation during 2021/22 (2020/21: 265
referrals). All referrals made to the team are investigated although many can
subsequently prove unfounded. 
2.6 Like many Council Services, the Corporate Fraud Team continued to work in different
ways throughout 2021/22. Property visits were suspended for the full year, and face-
to-face interviews were only carried out in the most exceptional cases. 
2.7 Despite this, 284 cases were closed during 2021/22 (2020/21: 287 cases). These can
be categorised as follows: 
Outcome Number of Cases
Closed with no issues identified 128
Referred to another agency (including SFIS) or Council
Service for investigation
74
Closed with results achieved (fraud, error or other
recovery/action)
82
TOTAL 284 
2.8 Fraud and error totalling £0.175m were identified and are categorised in the table
below: 
Category Value (£000)
Housing Benefit 14
Council Tax (including CTR, Single Person Discount
and other recoveries)
59
Covid-19 grants 16
Discretionary Housing Payments 2
Non-Domestic Rates 2
Housing 28
Procurement/Accounts Payable 40
Other 14
TOTAL 175 
2.9 In addition to the financial outcomes noted above, other outcomes/benefits were noted
as follows: 
• 32 tenancies were recovered by Housing with assistance from the Corporate Fraud
Team. Associated financial recoveries are included within the table at 2.8 above.
90

Page 91

• Six warning letters were issued for blue badge misuse, with two of these badges
being recovered.
• Two cases were referred to the Crown Office and Procurator Fiscal Service
(COPFS) for them to consider prosecution. 
Pro-active Work 
2.10 Two data matching exercises are currently underway using data from the council tax
and payroll systems, the aim of which is to identify any anomalies in the council tax
accounts of council employees. 
2.11 Some work from these exercises is still in progress, however the results at the end of
2021/22 were as follows:
• four cases of council tax arrears where recovery has commenced (£0.004m)
• 28 cases with single person’s discount anomalies (£0.026m). 
National Fraud Initiative (NFI) 
2.12 The latest biennial National Fraud Initiative (NFI) commenced in October 2020 with
the submission of data sets to the Cabinet Office. The team co-ordinates the Council’s
participation in the NFI. Data matches were received between February and
September 2021 and passed to the appropriate teams for further investigation. 
2.13 This exercise was completed on time by the due date of March 2022 and the
outcomes will be reported to a future meeting of the Audit and Scrutiny Committee
once Audit Scotland publish their 2020/21 outcomes report in summer 2022. 
3. Proposals 
3.1 It is proposed that the Committee notes the work carried out by the Corporate Fraud
Team. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
91

Page 92

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of the Corporate Fraud Team helps to support the efficient delivery of the
strategic priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation has been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None
92

Page 93

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Internal Audit and Corporate Fraud Action Plans: 
Quarter 4 update 
Purpose:  To advise the Audit and Scrutiny Committee on the progress
made by Council Services in implementing the agreed actions
from Internal Audit and Corporate Fraud reports as at 31 March
2022. 
Recommendation:  That the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions;
and (b) challenges those Services that have not implemented
actions within the previously agreed timescales. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in Scotland'
highlights that Audit Committees should monitor and review the progress made in
implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented.  This provides
assurance that identified control weaknesses have been addressed and are being
managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action.  This enables Internal
Audit to monitor progress on a 'real-time' basis and address any delays in
implementation. 
1.4 This report details the position at 31 March 2022. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 8 March 2022 highlighted that
there were 23 actions outstanding at the end of December 2021: four that had not
been started or were only partially implemented and 19 where the due date had not
yet passed. 
Agenda Item 8
93

Page 94

2.2 In addition to these 23 carried forward actions, there have been 12 new actions
agreed, giving a total of 35 action points for review. 
2.3 Services have completed 17 actions since the last report.  All Council Services are
required to retain evidence of work carried out in completing their actions and Internal
Audit carries out 'spot-checks' on a sample of completed actions on an ongoing basis. 
2.4 Of the remaining 18 actions, five were either not started or only partially complete at
31 March and the remaining 13 were not due for completion until after that date. 
2.5 Appendix 1 to this report provides the Committee with full details of the five actions
that were not complete within the agreed timescales. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and (b) challenges
those Services that have not implemented actions within the previously agreed
timescales. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud actions
helps to support the efficient delivery of the strategic priorities within the Council Plan
2019-2024. 
Community Wealth Building 
94

Page 95

4.7 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.
95

Page 96

Actions due by 31st March but not started or partially complete 
Code IA2019IJB001c Description HSCP Management should work with officers from East and South Ayrshire
HSCPs to progress the risk sharing arrangements at the earliest opportunity  
Priority 1 Latest Note
The pan Ayrshire work on Directions, including lead partnership arrangements is
still paused as a result of service pressures from COVID.   The plan is to now
have these embedded in by December 2022.
Progress Bar  Original Due Date 30-Sep-2019 Due Date 31-Mar-2022
Parent Code & Title IA2019IJB001 IJB Lead Partnership Arrangements
Managed By Caroline Cameron
Assigned To Caroline Cameron  
Code IA2019IJB001d Description
HSCP Management should work with officers from East and South Ayrshire
HSCP’s to progress the fair share methodology at the earliest opportunity,
including developing detailed Directions with commissioning plans  
Priority 1 Latest Note
The Pan Ayrshire work on Directions, including fair shares and set aside,
remains paused due to service pressures arising from the pandemic.   This and
other elements of the Directions work will be completed by December 2022.
Progress Bar  Original Due Date 31-Mar-2019 Due Date 31-Mar-2022
Parent Code & Title IA2019IJB001 IJB Lead Partnership Arrangements
Managed By Caroline Cameron
Assigned To Caroline Cameron 
96

Page 97

Code IA2020PA032a Description
Audit Action: Arran should be aligned with the mainland’s processes and
procedures.
Audit Finding: Staff on the mainland and Cumbrae are managing the interment
process electronically, whilst staff on Arran continue to use manual records.
Risk: Business continuity issues due to operating a completely separate system
on Arran; manual records are not backed-up in the same way that electronic
records are.  
Priority 2 Latest Note
We have a quote now from the software provider to upgrade the software to the
remote option.  We have passed the quote to IT to check it suits requirements
and what paperwork is required from them regarding data protection etc.  Arran
will be included in this. Fiona Porter has requested an update from IT regarding
the suitability and requirements of the quote from the software provider.  Target
date for completion is 31st July 2022.
Progress Bar  Original Due Date 31-Mar-2021 Due Date 31-Mar-2022
Parent Code & Title IA2020PA032 Bereavement and Burial Services
Managed By Thomas Reaney
Assigned To Mark McNeil 
97

Page 98

Code IA2021PA009b Description
Audit Action: The team should liaise with the Transformation team to streamline
this part of the process and reduce the number of times the same information
must be keyed.
Audit Finding: The admin team are required to update the budget monitoring
spreadsheet, an operational access database and the CareFirst system at each
stage of this process for all council tenant jobs. In addition, the access database
is not supported by IT Services.
Risk: Inefficient use of staff time and increased risk of keying errors.  
Priority 2 Latest Note A draft standard operational spreadsheet has been created and is now being
tested.  It is planned to complete the action by 6th June 2022.
Progress Bar  Original Due Date 31-Dec-2021 Due Date 31-Mar-2022
Parent Code & Title IA2021PA009 Aids and Adaptations
Managed By David Thomson
Assigned To Lynn Kirkland 
98

Page 99

Code IA2021PA013a Description
Audit Action: The current user manuals/training documents for the key areas
should be reviewed and adapted to include the Council’s internal process to
provide a compete user manual. 
Audit Finding: User manuals have not been updated since 2014/15 or no date
is noted. Also, although these documents provide a basic step by step flow of
system processes, they have not been adapted to include the Council’s internal
processes. 
Risk: Manual is out of date and incomplete.  
Priority 2 Latest Note
Significant work has been carried out in the quarter of 2021/22 to ensure a
timeline is in place to complete the action by Sept 30th 2022.
Internal Audit have been made aware of the slippage and agreed an extension.
This action will be completed by 30th Sept 2022 or before. 
Progress Bar  Original Due Date 31-Mar-2022 Due Date 31-Mar-2022
Parent Code & Title IA2021PA013 Building Services Systems
Managed By Yvonne Baulk
Assigned To Leigh-Ann Mitchell; Jim
Smith 
99

Page 100

100

Page 101

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed between March and April 2022. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed between March and
April 2022.  Internal control reviews have been completed in respect of the areas
detailed in Appendix 1 to this report. The aim of these reviews is to provide assurance
that the internal control framework within the areas examined is appropriate and
operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit. 
2.3 The findings from four separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below: 
Agenda Item 9
101

Page 102

Audit Title Assurance Level
General Ledger System Reasonable
Health and Social Care Partnership Procurement Substantial
Ayrshire Growth Deal Governance Reasonable
Secondary Schools Substantial 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between March and April 2022. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2019-2024. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
102

Page 103

Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Insurance), on 01294 324524. 
Background Papers
None.  
103

Page 104

GENERAL LEDGER SYSTEM 
1 Background  
1.1 An audit of the general ledger in 2018/19 focussed on feeder systems,
suspense/holding accounts and bank reconciliations.   A number of action points
were raised, and these have been followed up as part of this audit.  
1.2 In addition, a review of current Integra log-ins has been undertaken. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• All management actions raised during the 2018/19 Audit have been
completed to a satisfactory level
• Risks associated with the migration of Integra to the Cloud have been
identified and addressed
• Integra is being timeously updated to remove access rights from leavers. 
3 Findings   
Follow-up of previous Audit actions  
3.1 The action descriptions from the 2018/19 audit were as follows:-  
3.2 Action Action Description from 2018/19 report
a IT Services System Admin should contact Capita to request a solution
to either prevent the same feeder file being processed or, at the very
least, give a warning to the user that this file has already been
processed.
b An overarching procedure note for the suspense reconciliation
checklist spreadsheet should be produced.  Relevant staff should
familiarise themselves with such procedure notes, to ensure the
spreadsheet is properly completed.  The checklist should be reviewed
on a regular basis and any issues escalated promptly.
c There should be evidence that reconciliations have been
independently reviewed in a timely manner.
d Consideration should be given to closing the Creditors Grants bank
account if it is determined that it is no longer required and the balance
is suitably transferred.
e The Housing Advances bank account should be reviewed and the
reconciliations should recommence if this account is still being used.
f A decision should be made on the historical unreconciled Payroll
transactions as per the Payroll bank reconciliation to ensure they are
not continually carried forward.  
g Outstanding cheques from Masterpiece should be cancelled and a
process put in place for cancelling outstanding cheques since Integra
went live. 
3.3 ICT and Financial Management were able to demonstrate that all the above
issues have been addressed, therefore no further action is required.  
104

Page 105

Migration of Integra to the Cloud  
3.4 Capita hosts Integra on behalf of the Council.  
3.5 In November 2021 Capita migrated Integra from their own datacentre to a
Microsoft Azure cloud datacentre. Microsoft Azure has been used by the Council
for several years to host Office 365 and its Active Directory.  
3.6 In order to confirm that Capita is taking sufficient steps to ensure the security of
the Council’s data, Audit obtained a copy of Capita’s Integra Security
Management Plan.    
3.7 This plan confirms that it should be read in conjunction with:-
• National Cyber Security Centre (NCSC) Cloud Security Guidance
• General Data Protection Regulation (GDPR)
• UK Government Documentation, namely Information Security Standards
and Security Policy Framework (including ISO 27001 & ISO 9001 cross
reference) 
The above indicates that the principles set by the NCSC have been imbedded in
Capita’s security approach.   
Review of Integra users  
3.8 Audit obtained a list of all general ledger users from the Integra Systems Access
Team.  
3.9 This showed that whilst there are 2,685 general ledger users on Integra, 1,932 of
these have never logged on.  
3.10 The Systems Access Team confirmed that they were asked by eProcurement to
ensure all employees with a corporate AD (active directory) account were set up
in Integra.  This resulted in a high number of new accounts having to be created.  
3.11 To date, the new Integra function that required the additional users to be set up
hasn’t been implemented. (action point a)  
3.12 The Integra Systems Access Team receive a monthly leavers report from the
CHRIS payroll system.  Detailed audit testing identified 140 general ledger user
accounts that relate to employees who have left the Council.  This list has been
passed to the Systems Access Team for action.  (action point b)  
3.13 Integra can only be accessed from within the Council’s system.  There is a
separate internal audit of leavers’ and movers’ IT access currently ongoing. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained in the areas of the general ledger
covered by this Audit. 
105

Page 106

Definitions of Assurance Levels: 
Substantial The framework of governance, risk management and control is
adequate and effective.
Reasonable
Some improvements are required to enhance the adequacy and
effectiveness of the framework of governance, risk management and
control.
Limited
There are significant weaknesses in the framework of governance, risk
management and control such that it could be or could become
inadequate and ineffective.
None
There are fundamental weaknesses in the framework of governance,
risk management and control such that it is inadequate and ineffective or
is likely to fail. 
NB The level of assurance given is at the discretion of Internal Audit.  
106

Page 107

KEY FINDINGS AND ACTION PLAN
GENERAL LEDGER SYSTEM 
Action a
Finding A high number of general ledger users have never logged into the
system.
Action
Description
The Integra System Access Team should liaise with the eProcurement
Team to confirm if, and when, the new function is being added to
Integra. 
If it is not going ahead, the System Access Team should stop
automatically adding new corporate employees on to Integra and
deactivate all users who have had a log-in for more than a defined
number of days but have never used it.
Risk Resources are being used setting up Integra accounts that aren’t
needed or used; system access is not limited to those who need it.
Priority (1, 2, 3) 2
Paragraph
Reference 
3.11
Managed by Fiona Walker, Head of Service (People & ICT) & Mark Boyd, Head of
Service (Finance)
Assigned to Brendan Quigley (Senior Manager, ICT); Suzanne Quinn (Senior
Manager, Procurement)
Due Date 31 July 2022
Management
Comment
Agreement has been reached with Finance/Procurement that the
process of adding new corporate employees to Integra will cease and
the unused accounts will be removed. 
Action b
Finding Not all leavers’ accounts have been deactivated on Integra.
Action
Description
Integra System Administration should review the list of leavers
identified during the Audit and deactivate the relevant accounts on
Integra. 
Monthly leavers reports should be actioned timeously.
Risk Unauthorised individuals have access to Integra.
Priority (1, 2, 3) 1
Paragraph
Reference 
3.12
Managed by Fiona Walker, Head of Service (People & ICT)
Assigned to Brendan Quigley (Senior Manager, ICT)
Due Date Complete
Management
Comment
As a consequence of this Audit, this highlighted a bug in the system
that resulted in notifications of reports not being received by system
admin.  This has now been resolved and report notifications are being
received, and reports are dealt with on a regular basis.   All accounts
highlighted by this audit have been deactivated.   
107

Page 108

Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
108

Page 109

HSCP PROCUREMENT 
1 Background  
1.1 This audit was undertaken in line with the 2021/22 Audit Plan. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• Employees with a personal interest in a Council contract are being
identified and excluded from the contract award process
• Contractual arrangements are in line with the Council’s ‘Standing Orders
Relating to Contracts’
• Spend processed via Carefirst is being approved prior to its transfer to
Integra
• Procurement card spend is appropriate 
3 Findings   
Employees with a personal Interest in contracts  
3.1 As per the Council’s Employee Code of Conduct:-
“Any employee, or employees, involved in the decision making process must
notify their Head of Service by submitting a Declaration of Interests Form if it
comes to their knowledge that a contract in which they have a personal or
financial interest, whether direct or indirect, has been or is about to be entered
into by the Council.”  
3.2 Reliance is placed on employees highlighting a personal interest, however there
is a reminder of the need to confirm any conflicts included within the Request for
Procurement Action (RPA) form, which is completed for all procurements over
£10k.  
3.3 Audit asked to review the declaration of interest forms that have been submitted. 
The Service has confirmed that no forms have been lodged to date.   
Standing Orders relating to Contracts  
3.4 The Council’s Standing Orders relating to Contracts sets out the process for
awarding a contract, depending on the anticipated level of spend.  
3.5 Audit selected a sample of 15 suppliers with varying levels of actual spend and
reviewed the contract in place to ensure if complied with Standing Orders.  
3.6 Only 1 contract was not available for inspection during the Audit.  HSCP
Contracts & Commissioning were already aware of this issue and were working
on correcting it. No other issues were identified from this testing.   
Spending approved via Carefirst  
3.7 Approximately half of HSCP spend is imported into Integra via Carefirst feeders.  
109

Page 110

3.8 An initial review highlighted that processing and authorising methods within
Carefirst vary depending upon the service area, as does the supporting
information transferred into Integra.  
3.9 A detailed review of the processes within Carefirst was not feasible within the
budget of this audit, however it has been noted as an area for consideration
within future audit plans.   
Procurement card spend  
3.10 Approximately £740k has been spent by HSCP staff on procurement cards
between 1 April 21 and 3 March 22.  £135k of this total was cash withdrawals.  
3.11 Audit reviewed a sample of transactions looking for evidence of:-
• Disaggregation of expenditure to avoid card transaction limits, or Standing
Orders
• Inappropriate purchases being made via the card eg computer equipment
being bought via cards rather than through the Council’s IT team
• Cash being used for transactions that should be paid for by either invoice
or procurement card  
3.12 1 instance of cash being withdrawn to pay an invoice was noted during testing. 
Audit has highlighted this error with the cardholder and management.  No other
issues were noted.  
3.13 Audit also reviewed the level of cash withdrawn, but not yet spent - to ensure that
excessive amounts aren’t being held in Council premises.  Cash to the value of
approximately 1 months’ cash expenditure is being held, which seems
reasonable.   
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the areas covered by
this Audit. 
110

Page 111

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
111

Page 112

AYRSHIRE GROWTH DEAL 
1 Background  
1.1 The Ayrshire Growth Deal consists of a programme of 19 high-profile major
development projects across Ayrshire involving public, private and 3rd sector
partners and attracting funding from both Scottish and UK governments.  East
Ayrshire Council acts as the lead partner for the deal overall and hosts the Project
Management Office (PMO).  North Ayrshire Council is the lead partner for 9 of the
19 projects (6 capital, 3 revenue).  
1.2 The 6 capital projects are managed by the Growth and Investment Directorate. 
The 3 revenue projects are managed by the Economic Development and
Regeneration Service within the Place Directorate. The revenue projects are
Ayrshire-wide projects where North Ayrshire Council is the lead partner.  
1.3 Audit Scotland published a report on Scotland’s City Region and Growth Deals in
January 2020, making recommendations for improvements to governance
arrangements for these deals.   
2 Objectives and Scope  
2.1 The scope of this audit was limited to North Ayrshire Council’s role in the projects. 
It focused on the governance structures across the Council’s participation in the
deal rather than individual projects.  
2.2 The main objectives of the audit were to ensure that:
• governance structures and roles and responsibilities of officers and elected
members within North Ayrshire Council, in relation to the Ayrshire Growth Deal
are clearly defined and communicated in order to enable good governance
and strong accountability
• North Ayrshire Council has adequate risk management arrangements in place
in relation to the Ayrshire Growth Deal
• suitable arrangements are in place to monitor the progress of the Ayrshire
Growth Deal programmes within North Ayrshire, including appropriate
reporting and scrutiny arrangements
• there are adequate arrangements in place to ensure that North Ayrshire
Council is fulfilling the requirements of the Project Management Office and
external funding providers.   
3 Findings   
Governance Structures, Roles and Responsibilities  
3.1 Governance structures for decision-making and monitoring, both for individual
projects and the overall Ayrshire Growth Deal programme within North Ayrshire
Council, have been established and roles and responsibilities have been defined.   
112

Page 113

3.2 A Governance Framework for the capital projects managed by Growth and
Investment lays out the roles and responsibilities of the parties involved in these
projects.  Two of the revenue projects, Community Wealth Building and Working
for a Healthy Economy, have also documented the roles and responsibilities.  The
third revenue project, Ayrshire Skills Investment Fund, was at an early stage of
development at the time of audit work and these have not yet been fully
developed.     
Risk Management  
3.3 Risk Registers for all 9 projects have been prepared and input to Pentana.  They
are reviewed quarterly and presented to Programme Boards, Project Boards and
the Council’s Executive Leadership Team as well as being included in quarterly
submissions to the Scottish Government.  
3.4 All the risks aside from 3 (out of 190) have at least one mitigating action identified
under the heading “Internal Control” in Pentana.  It was also noted that a few of
the items listed under this heading were possible consequences of the risk
occurring (e.g. “reputational damage”) rather than mitigating actions to prevent or
reduce the impact of the risk. All the risks with missing or unsuitable mitigating
actions related to capital projects.  (Action a)   
Accountability, Scrutiny and Monitoring  
3.5 All the projects must report progress monthly to the PMO.  The PMO collates the
monitoring information each month and distributes a monitoring report to officers
across the 3 Ayrshire councils, including the Chief Executives, Section 95 Officers
and Chief Auditors.  The Pentana performance management system is being
used across the 3 councils to monitor progress against key milestones for all the
projects.  
3.6 The Growth and Investment projects report regularly to the Council’s Executive
Leadership Team.  Reports have also been taken to Cabinet at key stages of
some projects and reports on both the overall AGD programme and some
individual projects have been presented to the Ayrshire Economic Joint
Committee, which includes elected members from all the Ayrshire Councils. 
3.7 All the projects have regular monitoring meetings of their own steering groups,
other than the Ayrshire Skills Investment Fund, which is still at an early stage of
development.  
3.8 The projects are required to comply with HM Treasury Green Book project
management methodology.  The Green Book requirements include stakeholder
engagement and consultation.  6/9 of the projects have undertaken or are
planning to undertake some stakeholder engagement and consultation activities,
but some of them have not yet reached the stage where this is appropriate. 
3.9 The PMO has recently developed a Benefits Realisation Plan, which identifies the
outcomes, outputs and targets the projects want to achieve.  This plan stipulates
the data needed to monitor them, the method of data collection and the regularity
113

Page 114

of monitoring and reporting which will have to be incorporated into the projects’
monitoring and reported arrangements.       
Requirements of PMO and Funding Organisations  
3.10 The Ayrshire Growth Deal Agreement with the UK and Scottish Governments
imposes a number of conditions of grant upon the Councils.  Furthermore, the 3
Councils have signed a Memorandum of Understanding which places conditions
on the parties.  
3.11 The Council was found to have suitable arrangements in place to meet all the
requirements of the UK and Scottish Governments. For the revenue projects
where North Ayrshire is the lead partner, clarification is required regarding the
responsibilities of each partner and Internal Audit will be working with Economic
Development and Regeneration to obtain this clarification.  
3.12 Overall, North Ayrshire Council was found to have arrangements in place to meet
the requirements of the Memorandum of Understanding.  However, this document
requires a specific process for dealing with Freedom of Information requests
whereby relevant requests would be brought to the attention of the Ayrshire
Growth Deal Strategic Manager at the PMO.  Only the 2 Employability projects
stated that they had suitable arrangements in place to meet these requirements.
(Action b)  
3.13 Hitherto, none of the other funding bodies or partners have imposed any
additional conditions on the projects.  The projects gave assurance that if any
future funding body or partner does impose additional conditions, they will
develop arrangements to comply with these conditions.   
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the governance
arrangements for the Ayrshire Growth Deal within North Ayrshire Council.  Overall
good governance arrangements are in place, but some of the projects are still at
an early stage of development and therefore it has not been appropriate to fully
develop the governance arrangements yet.     
114

Page 115

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
115

Page 116

KEY FINDINGS AND ACTION PLAN
AYRSHIRE GROWTH DEAL 
Action a
Finding All the risks aside from 3 (out of 190) have at least one
mitigating action identified under the heading “Internal
Control” in Pentana.  It was also noted that a few of the items
listed under this heading were possible consequences of the
risk occurring (e.g. “reputational damage”) rather than
mitigating actions to prevent or reduce the impact of the risk.
All the risks with missing or inappropriate mitigating actions
related to capital projects.  
Action Description Project Managers should be reminded to ensure that they
complete the “Internal Control” field when adding risks to the
risk register in Pentana.  They should be reminded of the type
of information to be included in this field i.e. mitigating actions
to reduce the likelihood or impact of the risk.
Risk Actions to mitigate the risk are not identified and undertaken,
or it is not possible to monitor whether they are being
undertaken because they haven’t been recorded.
Priority (1, 2, 3) 2
Paragraph Reference  3.4
Managed by Karen Yeomans, Director (Growth and Investment)
Assigned to Lisa Jamieson, Strategy and Programme Manager
Due Date 30th April 2022
Management Comment Currently working on Risk Registers as part of the
Implementation Plan review (due to AGD PMO 07/04/2022). 
These will be reconciled to ensure Pentana is up to date and
mitigating factors identified by IA (3 missing and few with
inappropriate mitigation factors) will be checked to have been
updated.  An email will then be circulated, following on from
email issued on 29 Nov 2021 regarding importance of Risk
Registers, to remind Project Leads to ensure Internal Control
field is completed with suitable narrative.   
Action b(1)
Finding The Memorandum of Understanding with East and South
Ayrshire Councils requires a specific process for dealing with
Freedom of Information (FoI) requests whereby relevant
requests would be brought to the attention of the Ayrshire
Growth Deal Strategic Manager at the PMO.  Only the 2
Employability projects stated that they had suitable
arrangements in place to meet these requirements
Action Description Projects should ensure that they have suitable arrangements
to identify relevant FoI requests and bring them to the
attention of the AGD Strategic Manager.
Risk Failure to comply with the conditions of the Memorandum of
Understanding.
Priority (1, 2, 3) 2
Paragraph Reference  3.12
Managed by Karen Yeomans, Director (Growth and Investment)
116

Page 117

Assigned to Lisa Jamieson, Strategy and Programme Manager
Due Date 30th June 2022
Management Comment Currently follow NAC FoI procedures but have not
documented how we will report to the PMO regarding and FoI
for AGD projects.  The G&I Governance Document is
currently under review (yearly requirement) and will be
updated to include a FoI section aligning with MoU agreement
for FoI requests.  The Governance Document will be
circulated to all officers to ensure compliance with the MoU
between all three Ayrshire Councils.   
Action b(2)
Finding The Memorandum of Understanding with East and South
Ayrshire Councils requires a specific process for dealing with
Freedom of Information (FoI) requests whereby relevant
requests would be brought to the attention of the Ayrshire
Growth Deal Strategic Manager at the PMO.  Only the 2
Employability projects stated that they had suitable
arrangements in place to meet these requirements
Action Description Projects should ensure that they have suitable arrangements
to identify relevant FoI requests and bring them to the
attention of the AGD Strategic Manager.
Risk Failure to comply with the conditions of the Memorandum of
Understanding.
Priority (1, 2, 3) 2
Paragraph Reference  3.12
Managed by Caitriona McAuley, Head of Service (Economic Development
& Regeneration)
Assigned to Jude King, CWB Project Manager
Due Date Complete
Management Comment In the event that an FOI relating to the delivery of the AGD
CWB project is received by any of the project delivery teams
in North, East or South Ayrshire, this will be brought to the
attention of the CWB Programme Manager at North Ayrshire
Council.  This will subsequently be brought to the attention of
the PMO for discussion on a response to the FOI.  This was
raised on the agenda at the Steering Group meeting for the
project (20th April 2022) and responsibilities noted in the
action points of the meeting minutes which are circulated to
all attendees. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
117

Page 118

SECONDARY SCHOOLS 
1 Background  
1.1 Secondary schools were last audited in 2017/18.  
1.2 The ongoing risk of coronavirus has meant that this audit has been undertaken
remotely – no schools have been physically visited.  However, schools have been
asked to complete a detailed questionnaire, return various documents and
engage in further discussions with Audit where necessary. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• Staff are aware of all relevant Council governance procedures.
• All cash is being held securely.
• Cash withdrawals made via the Procurement Card are being used for
appropriate types of expenditure, and all transactions are being properly
recorded.
• school fund income and expenditure is being monitored and reconciled.
• Accurate inventory records are being kept.
• Pupil Equity Funding (PEF) spend is being maximised. 
3 Findings   
Governance  
3.1 Headteachers were asked to confirm they were aware of the following
procedures: 
Procedures
• Financial Regulations
• Code of Financial Practice
• Standing Orders relating to Contracts
• Defalcation Procedure
• Acceptable Computer Use Policy
• Procurement card policies 
and have completed the following training courses:- 
Training courses
• Financial Regulations
• Standing Orders relating to Contracts
• Cyber Security Essentials
• GDPR  
3.2 Not all Headteachers were aware of all of the above.  Audit has contacted each
Headteacher who has yet to familiarise themselves with procedures, or complete
training courses to request these are completed as soon as possible.  All
Headteachers have agreed to this request.  
118

Page 119

3.3 Schools were also asked to confirm that all relevant staff have completed cash
handling training.  All schools have confirmed that staff have completed training,
with a few members of staff awaiting slots on the training course.   
Cash Holding  
3.4 The level of cash being held in schools had decreased over the last few years.    
3.5 A cashless catering system operates within schools. Schools can also use this
system to allow for cashless payment of school trips, uniform purchases etc.    
3.6 All schools were asked to detail how cash is stored both during the school day
and overnight.  They were also asked to provide copies of keyholder registers.  
3.7 No issues were noted in the responses.  Based on the information supplied, all
cash is being stored securely.   
GPC Cash Withdrawals  
3.8 All schools withdraw cash via their procurement cards to pay for small incidental
items.  Cash should only be used when there is no alternative method of payment
available, such as invoice or credit card.  GPC cash use within schools was found
to be low.    
3.9 Cardholders complete cash spreadsheets detailing how cash has been spent. 
These spreadsheets should be loaded onto SDOL.  Audit found that not all
spreadsheets had been uploaded, although they were available directly from the
cardholder.  A review of these spreadsheets highlighted no inappropriate cash
expenditure.  
3.10 During the course of the Audit, Education HQ agreed to email all cardholders
reminding them of their responsibility to upload cash spreadsheets onto SDOL.   
School Fund  
3.11 Schools were asked a number of questions surrounding their management of
school fund income and expenditure in order to confirm that:-
• School funds are being kept separate from core school funds
• An audit trail of all income and expenditure is being maintained via receipts
• All funds are being accounted for via frequent reconciliations of cash and
bank balances 
3.12 All schools confirmed they are carrying out monthly reconciliations of school fund
balances.  Schools are normally required to submit copies of independently
audited school fund accounts to Education HQ annually – however a number of
schools highlighted issues with achieving the submission deadline in 20/21 due to
coronavirus.  All schools have confirmed that 21/22 accounts will be audited and
submitted timeously.  
3.13 No other issues were noted during testing.    
119

Page 120

Inventory records  
3.14 Coronavirus related legislation (such as the need for distancing, keeping pupils in
‘bubbles’) is likely to have resulted in the realignment of classrooms, resources
and equipment.    
3.15 Whilst some schools have highlighted issues in undertaking detailed inventory
checks in 20/21 due to coronavirus, all have confirmed that records will be
updated for 21/22.   
Pupil Equity Fund (PEF)  
3.16 All schools were anticipating an underspend of PEF funding as at 31st March 22. 
The impact of coronavirus on the availability of staff, and lead times on resources
(particularly IT items) have contributed to this underspend. 
3.17 Underspends can be rolled forward and used up to the end of the school term
(end of June 22).  
3.18 Audit requested details on how PEF spend is monitored during the year.    
3.19 Education HQ confirmed that all schools submit a forecast spend at the start of
the financial year.  Education HQ sends out monthly spend information comparing
this forecast to:-
• actual spend to date 
• payroll projections based on staff currently in post, adjusted to reflect any
known new starts and/or leavers.    
3.20 The above monitoring should allow early identification of any over or
underspends, thereby allowing schools to adjust their spending plans. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard the areas covered by this
audit. 
120

Page 121

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
121

Page 122

122

Page 123

NORTH AYRSHIRE COUNCIL 
31 May 2022 
Audit and Scrutiny Committee 
Title:    Participatory Budgeting 
Purpose:  To update the Audit and Scrutiny Committee on engagement
methods used in Participatory Budgeting events. 
Recommendation:  That the Audit and Scrutiny Committee: 
a) Reviews the engagement methods used in recent Participatory
Budgeting events; and
b) Approves the recommended engagement methods for use in
future events. 
1. Executive Summary 
1.1 The Community Empowerment (Scotland) Act 2015, Community Wealth Building and
the Scottish Government’s Open Government Action Plan all support the greater
involvement of local people in democratic and community activities, increased
participation in local financial decision-making and, in particular, the increased use of
participatory budgeting (PB) approaches. 
1.2 Participatory budgeting is a democratic way for people to have a direct say on how
public money is spent.  A PB process gives people the opportunity to identify and
discuss what matters to them in their communities and to vote on their priorities. North
Ayrshire Council’s PB approaches have been recognised as sector-leading awarding,
with successful engagement across grant-making, thematic and mainstream PB, using
different approaches. PB has been the successful lead into mainstreaming PB, securing
community, elected member and partner support. 
1.3   Concerns were expressed at the meeting of the Audit and Scrutiny Committee on 14th
September 2021 in relation to the impact of the Covid-19 pandemic as in-person
community engagement and voting procedures could not be carried out in the normal
way. This report provides an update on engagement methods to be taken now that
restrictions have eased. 
2. Background 
2.1 The Community Empowerment (Scotland) Act 2015, Community Wealth Building and
the Scottish Government’s Open Government Action Plan all support the greater
involvement of local people in democratic and community activities, increased
participation in local financial decision-making and, in particular, the increased use of
Agenda Item 10
123

Page 124

participatory budgeting (PB) approaches. The Council’s Statement of Intent to develop
a Participation Strategy and Scottish Government’s ‘Report of the Institutionalising 
Participatory and Deliberative Democracy Working Group’ are both committed to
developing PB further. 
2.2 Participatory Budgeting is all about giving local people a say. Participatory Budgeting
(PB) helps the Council to provide equal opportunities for communities to participate and
have their voices heard in service choices which affect them. PB developed in Brazil
and is widely used in many countries. In the UK, PB is developing from small scale
community grant allocations. Voting is a characteristic of PB and the Council has
previously used in-person voting and young people have used digital voting via the
Young Scot website. However, the public engagement in both the development of the
ideas and expressing views regarding the final outcome is as important. 
2.3 Locality Partnerships have been pivotal to North Ayrshire’s success in moving local
decision-making into communities. They have each established their own priorities in
relation to addressing local inequalities. Grant awarding PB has been the successful
lead into mainstreaming PB, securing community, elected member and partner support.
Mainstream PB can play a central role in collectively defining services, post pandemic,
which meet the changed (and changing) needs of communities. 
2.4   The Council’s vision for PB is embedded in the vision for radical, participatory democracy
in which local people take decisions on the things which affect their lives. Participatory
budgeting is part of a range of participatory approaches to share municipal power and
influence, including: 
• Increasing transfer of financial decisions, ownership of assets, and power to
communities;
• Setting priorities and delegating the resources of £3m Community Investment Fund,
recently topped up with further £3m, to Locality Partnerships;
• Working collaboratively with Young People through the Joint Cabinet;
• Partnership working with Older People’s Forums and Tennant’s Participation Forum;
• Opening up local government to a wider process of continuous participation; and
• PB is identified as one of 3 CLD Strategic Plan Priorities. 
2.5 The benefits to using participatory methods include: 
• Much greater involvement in decision making across the Council;
• Much more transparent;
• Reach wider range of groups;
• Improved trust between Council & communities;
• Increased democratic participation; and
• Greater sense of ownership and control  
• Real devolved power to Localities. 
2.6 North Ayrshire Council has attracted national recognition for its sector-leading work in
Locality, Youth and Mainstreaming PB, as noted in the 2020 Best Value Audit Report.
It is the only Council in Scotland which achieved the Scottish government target of
allocating 1% of its mainstream resources through participatory methods. 
• The percentage of Council budget directed via participatory methods during 2020/21
was 1.13% which is £4,044,679.
124

Page 125

• Thematic PB events have included – Alcohol and Drugs Related Death, Community
Food and Growing, Tourism, Grounds Maintenance, Roads, Street Lighting and Street
Cleaning. PB methods have been used in Capital Programmes such as Lochshore
and the HRA Revenue Fund involves tenants in determining aspects of budgets for
Housing (Tenant-led) Maintenance, Infrastructure and Repairs.
• Mainstream PB has included £1.2m libraries and community facilities and £750,000
grounds maintenance budget to participatory budgeting.
• Different approaches to engage with the public have included a ‘Dragon’s Den’
approach, marketplace presentation, and digital and paper-based voting. In -person
events attracted large public support, however, this has not been possible when
restrictions on large gatherings were in place.
• In February 2020, the Cabinet approved a recommendation to allocate all future Youth
and Community grants by PB via Locality Partnerships (£154,185).
• In November 2021, 4,726 young people aged 8-25, cast 14,178 votes for nearly 100
projects for young people, sharing £97,500 across North Ayrshire localities.
• In the last round of Locality and Arts and Culture PB, in February 2022,  £164,000 was
allocated to 153 local groups and organisations and 33 local people were involved in
short-listing the applications. 
2.7 Approach is recognised by COSLA, the Local Governance Review Team and the
Scottish Government as good practice and earned the council a place in the finals in
the 2017 APSE awards. 
2.8 North Ayrshire Council’s Officers play an active role in national PB Working Groups. 
2.9 The Covid-19 Pandemic presented challenges in how best to engage with the public in
the light of restrictions, staff shortages and building closures. During the pandemic,
mainstream PB moved online with increased use of digital channels. It was more
difficult. 
2.10 As discussed in paragraph 2.2, public voting is one characteristic of PB, however the
ability of the public to bring forward their projects and to influence the decision-making
is a central component of the process. During the 2020/21 PB round referred to by the
Audit and Scrutiny Committee the following public participation took place: 
• Youth PB: 3500 young people voted;
• Locality PB: 26 local people took part in the steering group and, (no public vote took
place because there was sufficient funding to meet all projects); 
• Locality PB - 107 community groups took part by applying for funding; and
• Alcohol and Drugs Partnership Thematic PB - 206 people voted, with 616 unique
votes. 
2.11 PB events have to strike a balance between tight deadlines, available resources, wide
participation and workload. PB can’t be seen as a stand-alone approach and needs to
be built into wider approaches; and the Locality Partnerships and Locality Team hare
pivotal. As restrictions ease, there are more opportunities to resume in-person events
and embed PB in regular service delivery. Digital channels have provided alternatives
but are not always inclusive. A further challenge is sustaining public interest in PB and
motivating engagement by local groups and organisations, as their resource for PB
applications is completing with the variety of external covid-recovery funding. 
125

Page 126

2.12 In future PB events it is recommended that the Council uses a diverse range of
approaches: 
• Combine PB events and seek partners, where possible, to create larger funding
opportunities and streamline process - making the best use of staff resources and
avoiding duplication of effort by groups and organisations and improving processes;
• Pre-engagement stakeholder groups to shape the PB engagement;
• Community stakeholder reference group to steer the process;
• Work closely with stakeholder reference groups and partners to make the best use of
collective marketing and communication opportunities;
• Informal, local chit-chat sessions with communities, with a mix of in-person and digital;
• Engagement with hard to reach through regular community activities like Redburn
Breakfast Club or community food larders;
• Improved use of CONSUL (an online platform used by the Council and supported by
CoSLA), Office 365 tools like MS Forms for auto-generated analysis and ranking tools,
Young Scot online platform, focus groups and steering groups on zoom and Facebook
and Facebook Live;
• Alerts on Council Tax Billing and e-billing, use of press releases and telephone call-
backs;
• Hard copy in public buildings, community setting like libraries; and
• Partnerships with community groups to extend reach. 
2.13 Officers have been increasing partnership working and awareness raising with Finance,
Council’s Senior Leadership with sessions for elected members, Chief Officers and
Senior Managers. A PB awareness session has been launched within the Council’s
Connected Leadership OD programme. 
2.14 Mainstream PB can play a central role in collectively defining services, post pandemic,
which meet the changed (and changing) needs of communities. Locality Partnerships
have all reviewed their priorities and continue to work closely with communities to
ensure their priorities are at the heart of PB. Islands have had an additional chance to
review and consolidate previous work on local needs to support the development of
Island Local Action Plans through a post-pandemic lens. The forthcoming Participation
Strategy will identify further ideas for developing PB in its consultation and these will be
integrated into future provision.   
3. Proposals 
3.1 That the Audit and Scrutiny Committee: 
a) Reviews the engagement methods used in recent Participatory Budgeting events; and
b) Approves the recommended engagement methods for use in future events. 
4. Implications/Socio-economic Duty 
Financial 
4.1 PB funding is allocated within existing resources. 
126

Page 127

Human Resources 
4.2  PB is resource-intensive and PB development has to be balanced with staff capacity
and resources within local group and organisations to engage with PB. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The purpose of PB is increase community involvement in local decision-making. North
Ayrshire Council has worked with Locality Partnerships to develop its PB approach
which will reduce inequalities, increase community cohesion and advance community
empowerment.   
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 The proposals contained within the report support the North Ayrshire Council Plan
priorities: 
•  Active and strong communities
•  Inclusive, growing and enterprising local economy
•  People enjoy good life-long health and wellbeing. 
Community Wealth Building 
4.7  PB increases democratic ownership of local financial decision-making and allocation
of resources. 
5. Consultation 
5.1 The PB proposals contained within this report have been developed with Locality Teams
and through various PB events designed with Locality Partnerships, partners and local
people, including young people. 
Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Rhona Arthur, Head of Connected Communities,
on 01294 324415. 
Background Papers
Click here to enter text. 