North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 31 October 2024 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 29 August 2024 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Call In: Household Waste Recycling Centre (HWRC) Digital Booking
System
Submit report by the Head of Service (Democratic) on two call-in request
received in respect of a decision taken by Cabinet on 1 October 2024 to
approve the proposal to procure and implement a digital booking system
within all Household Waste Recycling Centres (HWRCs) on the mainland
and the Isle of Arran (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
4 Elected Member Development
Submit report by the Head of Service (Democratic) providing information
and seeking views on the development sessions provided to Elected
Members over the 13 months from August 2023 to August 2024, and on
future planned development sessions (copy enclosed). 
5 Year End Performance Reporting 2023-24
Submit report by the Head of Service (Democratic) advising of progress
on Council Plan priorities and the Council Plan Year End Performance
Reporting (copy enclosed). 
6 Carbon and Scope 3 Emissions        
Submit report by the Executive Director (Place) providing an update to the
Committee on what was included in the Council’s carbon emission
reporting, and ongoing work to understand and reduce scope 3 emissions
(copy enclosed). 
7 Community Asset Transfer Process        
Submit report by the Executive Director (Communities & Housing)
providing an update on the process for Community Asset Transfer
applications (copy enclosed). 
8 Annual Assurance Statement to the Scottish Housing Regulator
2023/24
Submit report by the Executive Director (Communities & Housing)
advising of the Council's Annual Return on the Charter 2023/24
submission and requesting endorsement of the Annual Assurance
Statement to be submitted to the Scottish Housing Regulator (copy
enclosed).   
9 National Fraud Initiative (NFI) in Scotland 2024        
Submit report by the Head of Service (Finance) providing an overview of
the NFI 2022/23 exercise outcomes (copy enclosed). 
10  Internal Audit Annual Update Report – North Ayrshire Integration
Joint Board (IJB)        
Submit report by the Head of Service (Finance) informing of the IJB’s
annual report for 2023/24 and the approved internal audit plan for
2024/25 (copy enclosed). 
11  Internal Audit Plan 2024/25: Mid-year Update        
Submit report by the Head of Service (Finance) providing an update on
progress made in delivering the 2024/25 Internal Audit Plan (copy
enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
12  Corporate Fraud Team update report        
Submit report by the Head of Service (Finance) providing an update
report on the work of the Corporate Fraud Team between April and
September 2024 (copy enclosed). 
13  Internal Audit Reports Issued        
Submit report by the Head of Service (Finance) informing of the findings
of Internal Audit work completed between August and September 2024
(copy enclosed). 
14  Internal Audit and Corporate Fraud Action Plans Quarter 2 update        
Submit report by the Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 September 2024 (copy enclosed). 
15  Strategic Risk Register 2024/25: Mid-year Update        
Submit report by the Head of Service (Finance) providing an update on
the progress with actions related to the Strategic Risk Register (copy
enclosed). 
16  Standing Item of Business: Consideration of future business for
scrutiny 
17  Urgent Items        
Any other items which the Chair considers to be urgent. 
18  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following items of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following reports are confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
19  Investigation Reports Issued
Submit report by the Head of Service (Finance) informing of investigative
reports finalised since the last meeting (copy enclosed). 
20  Internal Audit Reports Issued
Submit report by the Head of Service (Finance) informing of the findings
of Internal Audit work completed between August and September 2024
(copy enclosed).
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-
ayrshire.public-i.tv/core/portal/home, where it will be capable of repeated
viewing. At the start of the meeting, the Provost/Chair will confirm if all or
part of the meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018. Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those
records available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering
the Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining
to you contained in the video and oral recording of the meeting will be
used for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which
is necessary for the performance of a task carried out in the public
interest. 
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk 
4

Page 5

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney 
Chair: 
Apologies: 
Attending: 
5

Page 6

6

Page 7

Audit and Scrutiny Committee
29 August 2024
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine.
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Cameron Inglis, Matthew McLean, *Davina
McTiernan and Donald L. Reid.
*Attended later in the meeting.
Present (Remote Participation)
Tom Marshall.
In Attendance (Physical Participation)
C. Hatton, Chief Executive; D. Hammond, Executive Director (Communities and
Housing); L. Cree, Head of Service (Sustainability, Transport and Corporate
Property); A. McClelland, Head of Service (Education); P. Doak, Head of Service
(Finance and Transformation) (Health and Social Care Partnership); M. Boyd, Head
of Service, D. Forbes, Senior Manager (Strategic Business Partner), J. McCallum,
Senior Manager, G. McMaster, Fraud Investigator (Audit, Fraud, Safety and Risk)
(Finance); F. Walker, Head of Service and J. Smillie, Senior Manager (People
Services) (People and ICT); and A. Craig, Head of Service, C. Stewart, Committee
Services Officer and H. Clancy, Senior Committee Services Officer (Democratic)
(Corporate Services).
Also in Attendance (Physical Participation)
D. Jamieson, Audit Scotland.
Chair
Councillor Bell in the Chair.
Apologies
John Sweeney.
1. Declarations of Interest
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors.
2. Minutes
The Minutes of the Meeting of the Audit and Scrutiny Committee held on 30 May 2024
were confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973.
Agenda Item 2
7

Page 8

3. Internal Audit Reports Issued
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed between May and July 2024. The Internal control reviews which
have been completed in respect of the areas detailed were attached as Appendix 1
to the report.
Officers were heard in response to Members’ questions and the Committee agreed
to note the outcomes from the Internal Audit work completed as set out in the report
and detailed in Appendix 1 to the report.
Note: Councillor McTiernan entered the meeting during consideration of the above
item.
4. Internal Audit and Corporate Fraud Action Plans: Quarter 1 Update
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 30 June 2024.
The Committee agreed to note the current position with the implementation of
Internal Audit and Corporate Fraud actions.
5. Best Value Thematic Work in North Ayrshire Council 2023-24
Submitted report by the Head of Service (Finance) requesting the Committee to note
the Best Value Thematic Work reports for 2023/24 and to consider a verbal report by
the external auditor. The Improvement Action Plan was attached at Appendix 1 to
the report.
Members considered the verbal report provided by the external auditor and officers
were heard in response to Members’ questions. The Committee agreed to (a) note
the findings of the external auditor’s Best Value Thematic Work report; and (b) note
the Improvement Action Plan outlined in Appendix 1 to the Report.
6. Climate Change Target & Associated Policies
Submitted report by the Executive Director (Place) on the Council’s progress of the
Sustainable North Ayrshire Strategy (2024-27).
Officers were heard in response to Members’ questions and agreed to bring a further
report back to a future Committee on what was incorporated in terms of carbon
emissions (i.e. Council estate assets including office rationalisation, KA Leisure,
Council housing and fleet operations), and the wider work which was ongoing across
the Council concerning wider (indirect) emissions, commonly known as Scope 3
emissions and how best to capture this.
The Committee noted the report and agreed that a further report be brought to a
future Committee on what was incorporated in terms of carbon emissions (i.e.
Council estate assets including office rationalisation, KA Leisure, Council housing
8

Page 9

and fleet operations), and the wider work which was ongoing across the Council
concerning wider (indirect) emissions, commonly known as Scope 3 emissions and
how best to capture this.
7. Standing Item of Business: Consideration of Future Business for
Scrutiny
Members were invited to consider potential items of scrutiny business for future
meetings.
In relation to a request from Councillor Marshall, the Committee agreed to receive a
report to a future meeting on statistical data in respect of staffing levels and costs
of the Council, by Department, over the last 3 years.
8. Urgent Items
There were no urgent items.
9. Exclusion of the Public – Para 1
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following items of business on the grounds indicated in terms of Paragraph 1 of Part
1 of Schedule 7A of the Act.
10. Investigation Reports Issued
Submitted report by the Head of Service (Finance) on investigation reports finalised
since the last meeting.
Following questions and discussion, the Committee agreed to note the outcomes
from the investigations carried out.
The meeting ended at 11.25 a.m.
9

Page 10

10

Page 11

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee 
Title:    Call In: Household Waste Recycling Centre (HWRC) Digital
Booking System 
Purpose:  To allow the Committee to consider two call-in requests in
respect of the decision taken by Cabinet at its meeting on 1
October 2024 to approve the proposal to procure and implement
a digital booking system within all Household Waste Recycling
Centres (HWRCs) on the mainland and the Isle of Arran. 
Recommendation:  That the Committee considers the terms of the call-in requests
set out at Appendices 1A and 1B and agrees, or otherwise, to
make a recommendation to the Cabinet. 
1. Executive Summary 
1.1    In terms of the Scheme of Administration (Section 5), the Audit and Scrutiny Committee
has a remit to consider call-in requests and invite at least one of the Members who has
requested the reference to call-in to attend the Committee to explain the request. 
1.2 This report sets out the background to two call-in requests in respect of the decision
taken by Cabinet at its meeting on 1 October 2024 in relation to the report on
Household Waste Recycling Centre (HWRC) Digital Booking System. 
2. Background 
2.1 The Cabinet, at its meeting on 1 October 2024, considered a report by the Head of
Neighbourhood Services seeking approval to implement a digital Household Waste
Recycling Centre (HWRC) booking system at all sites. 
2.2 Two call-in requests have been received in terms of the call-in procedure set out in the
Council's Scheme of Administration and Standing Orders, that the Audit and Scrutiny
Committee examine the decision taken by the Cabinet. These are presented (in the
order received) at Appendices 1A and 1B: 
Appendix 1A – Call-in request signed by Councillors Stalker, S. Ferguson and T.
Ferguson 
Appendix 1B – Call-in request signed by Councillors McDonald, Currie and Cullinane 
Agenda Item 3
11

Page 12

The desired outcome of both call-in requests is that the proposal to implement and
procure a digital booking system at all Household Waste Recycling Centres on the
mainland and on the Isle of Arran does not proceed. 
2.3 A copy of the original report presented to Cabinet on 1 October 2024 is attached as
Appendix 2 to the report.  A briefing note has been provided by the Head of Service
(Neighbourhood Services) and is attached at Appendix 3. 
2.5 Both call-in requests are valid for consideration by the Committee.  The requests were
received within the appropriate timescale, signed by three Elected Members
respectively and, in both cases, details were provided on both the reason for the call-
in and the desired outcome. 
2.6 The Elected Members who have submitted the call-in will be invited to address the
Committee to explain the respective call-in requests.  The appropriate Cabinet
Member, will then be invited to clarify the reasons for the decision. The relevant senior
officer will also be present to provide information on the report presented to Cabinet
and on issues raised by the call-ins received. The Committee will have an opportunity
to ask questions of both parties and of those officers in attendance. 
2.7 The Committee will then debate the call-in requests and decide whether or not it
agrees with the decision of the Cabinet. 
2.8 The Audit and Scrutiny Committee therefore has to:- 
i)  decide if it agrees or not with the decision of the Cabinet; and
ii) consider what alternative action the Committee would recommend to the
Cabinet if it does not agree with the decision. 
2.9 If the Audit and Scrutiny Committee does not agree with the Cabinet decision and
recommends alternative action to Cabinet, the Chairperson or another member of the
Audit and Scrutiny Committee will have the right to attend the Cabinet and speak in
support of any recommendation. 
2.10 In the event the Cabinet declines to accept the recommendation from the Audit and
Scrutiny Committee, the matter will be referred to Council for determination.  The
decision of the Council will be final.  
3. Proposals 
3.1 It is proposed that the Committee considers the call-in request set out at Appendices
1A and 1B.
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are outlined in the Household Waste Recycling Centre
(HWRC) Digital Booking System report attached at Appendix 2. 
12

Page 13

Human Resources 
4.2 The human resource implications are outlined in the Household Waste Recycling
Centre (HWRC) Digital Booking System report attached at Appendix 2. 
Legal 
4.3 The legal implications are outlined are outlined in the Household Waste Recycling
Centre (HWRC) Digital Booking System report attached at Appendix 2. 
Equality/Socio-economic 
4.4 The equality/social-economic implications are outlined in the Household Waste
Recycling Centre (HWRC) Digital Booking System report attached at Appendix 2. 
Climate Change and Carbon 
4.5 The climate change and carbon implications are outlined in the Household Waste
Recycling Centre (HWRC) Digital Booking System report attached at Appendix 2. 
Key Priorities 
4.6 The key priorities are outlined in the are outlined in the Household Waste Recycling
Centre (HWRC) Digital Booking System report attached at Appendix 2. 
Community Wealth Building 
4.7 The community wealth building implications are outlined in the Household Waste
Recycling Centre (HWRC) Digital Booking System report attached at Appendix 2. 
5. Consultation 
5.1 No formal consultation has been undertaken at this stage. 
Craig Hatton
Chief Executive 
For further information please contact Craig Stewart, Committee Services Officer, on 
01294 324130 
Background Papers 
N/A
13

Page 14

Appendix 1A 
Call In Request by Councillors Stalker, S. Ferguson and T. Ferguson 
Reason for Call In 
“1. The process of the booking system did not include a consultation or public
engagement period 
2. It is not required as the HRWC sites are not busy, this does not require a
booking system to be implemented 
3. It will lead to an increase in fly-tipping as many people will not use the system
and in so will dump rubbish in public areas”. 
Desired Outcome 
Not to proceed with the proposal to procure and implement a digital booking system
within all Household Waste Recycling Centres (HWRCs) on the mainland and the
Isle of Arran.
14

Page 15

Appendix 1B 
Call In Request by Councillors McDonald, Currie and Cullinane 
Reason for Call In 
“the current system isn’t broken. Changing to a digital booking system could
result in an increase in fly-tipping and impact our waste performance”. 
Desired Outcome 
Not to proceed with the proposal to procure and implement a digital booking system
within all Household Waste Recycling Centres (HWRCs) on the mainland and the
Isle of Arran. 
15

Page 16

NORTH AYRSHIRE COUNCIL
1 October 2024
Cabinet
Title: HOUSEHOLD WASTE RECYCLING CENTRE (HWRC)
DIGITAL BOOKING SYSTEM
Purpose: To seek approval from Cabinet to implement a digital Household
Waste Recycling Centre (HWRC) booking system at all sites.
Recommendation: That Cabinet approves the proposal to procure and implement a
digital booking system within all Household Waste Recycling
Centres (HWRCs) on the mainland and the Isle of Arran. 
1. Executive Summary
1.1   The Council operates four Household Waste Recycling Centres (HWRCs) located in
Irvine, Kilbirnie, Largs and at Brodick on the Isle of Arran.
1.2 A HWRC permit system has operated since August 2011 at the mainland HWRCs for
vans and trailers, with height restriction barriers being installed. A pre-paid permit
system is in place at Brodick for commercial vehicles.
1.3 The Council approved a saving in February 2024 of £75,000 to reduce HWRC Opening
Hours. The implementation of a digital booking system will support the budget decision
for reduced operating hours/days and help minimise the impact on our customers.
1.4 The procurement and implementation of a digital booking system at HWRCs will
provide a range of benefits, which are detailed in paragraph 2.5. The system will allow
customers to book slots at HWRC sites at a time convenient to them and this will
enable the appropriate support to offload their household waste safely and correctly,
minimising contamination and improving recycling.
1.5 An outline of the key aspects of how the digital booking system will operate are detailed
at paragraph 2.7.
2. Background
2.1 The Council operates four Household Waste Recycling Centres (HWRCs), three on the
mainland, located in Irvine, Kilbirnie and Largs and one in Brodick on the Island of
Arran.
2.2 A HWRC permit system for vans and trailers was implemented in August 2011 on the
mainland, which included the installation of vehicle height restriction barriers. The
Appendix 2
16

Page 17

permits allow 12 visits per annum per household, however if residents wish to use a
HWRC more frequently for the reuse/recycling or disposal of household waste only,
additional permits may be issued where justified. A pre-paid permit process is in place
at Brodick HWRC for the deposit of commercial waste only, as alternative disposal
facilities on Arran are limited. 
2.3 The Council approved a saving in February 2024 of £75,000 to reduce HWRC opening
hours, based on closing the sites for some days and we will no longer operate 7 days
per week. This will likely result in longer than usual waiting times at peak periods, as
well as on the day after sites re-open. The implementation of a digital booking system
will support delivery of the budget decision for reduced operating hours/days, while
minimising the associated impact on our customers. 
2.4 The Corporate Transformation Team and officers from the Waste Service have
engaged with a range of councils that have already implemented a digital HWRC
booking system and identified best practice from them to support the implementation of
a system within North Ayrshire’s HWRCs. The feedback received from some of the
Councils included: 
• East Renfrewshire Council - received minimal complaints regarding the introduction
of the booking system.
• South Ayrshire Council - since the implementation of the booking system they have
not had to review any incidents at their Ayr site and from a safety point of view, it
has been a great improvement. Customers commented on how much safer they
felt when visiting their sites.
• Hampshire County Council - HWRC tonnages decreased by 70,000 which equates
to a 37% reduction and only 3% of bookings are being made over the phone, with
the rest being made online.
• Kent County Council – site staff have reported an increase in job satisfaction.
• North Lanarkshire Council - during a pilot in 2023/24 at one HWRC, 59,000
bookings were made and 98.6% were online, with positive feedback from site staff
and customers. Following the successful pilot this is now being implemented at all
their sites.
• Research has shown that councils who have implemented a booking system have
not experienced a visible increase in fly tipping following its inception. 
2.5 The system will focus on allowing customers to be able to book a time slot at HWRC
sites at a time convenient to them and this will enable the provision of appropriate
support to offload their household waste safely and correctly, minimising contamination
and improving recycling. The key benefits of implementing a digital HWRC booking
system include: 
• Customer Experience
o Avoidance of long queues at sites, particularly at peak times and providing
certainty of access to the site at the time and date booked, while reducing
customer waiting/lost time.
o Reduced vehicle idling when queuing, reducing vehicle emissions and the
associated fuel costs for customers.
o Freeing up staff to assist with customers and encourage reuse/recycling.  
17

Page 18

o Ability to send booking reminders and bulk notifications to customers e.g. for
emergency site closures/ training.
o Supporting the ability to book the same day will be a key element of the
system.
o Providing a simple and standardised booking experience, which will support
the incorporation of the existing HWRC permit access system and policy for
vans, trailers and oversize vehicles, standardising the application process
and streamlining the approach for customers.
o Provides an opportunity to close off booking times at individual sites for small
periods as required to allow the delivery of essential staff training.
o Supports the ‘Meet and Greet’ approach to ensure customers have booked
and to ascertain what wastes customers have for deposit at the site. 
• Health and Safety
o Reduced traffic at the sites ensures a safer site for the customer and
employees, particularly at peak times. 
o It will reduce the risk of violence and aggression towards staff.
o It will prevent Police Scotland having to visit the sites during extremely busy
periods to deal with traffic congestion and reduce queue jumping incidents
and the associated customer and staff issues in respect of this. 
• Site Misuse
o Ability to monitor the level of customer visits / flag up unusual visit patterns,
helping to identify and prevent site misuse.
o Discourage commercial businesses from misusing the sites. 
o Ensure no hazardous waste enters sites e.g. asbestos and supports the
provision of waste related information to customers in advance of their visit
(waste packing advice, waste disposal guidance etc).
o Avoidance of fly-tipping near HWRCs, due to certainty of access and never
having to leave a site with a full vehicle. 
• Analysis
o Allows the understanding of patterns/trends for site usage through bookings
and the type of materials that are being presented for reuse, recycling or
disposal.
o Supports engagement with frequent site users to ascertain whether
additional support is required e.g. help with recycling at home. 
• Financial
o It will improve staff vigilance which will help to reduce contamination and the
associated contamination contractual charges levied on the Council.
o Improved staff vigilance will help to increase reuse/recycling and reduce
waste disposal costs.
o It will help to reduce the overall disposal costs due to reduced tonnages,
through avoiding waste from residents of neighbouring councils and
improved commercial waste controls.  
18

Page 19

2.6 The system will focus on allowing customers to be able to book slots at HWRC sites at
a time convenient to them and this will enable the appropriate support to offload their
household waste safely and correctly, minimising contamination and improving reuse
and recycling. 
2.7 The key aspects of how the digital booking system will operate are included below: 
• Customers will still be able to call to book slots via the contact centre without
signing up to MyNAC, however it is expected the vast majority will book on-line.
• Should a customer present at a site without a booking then a ‘one time’ pass will be
issued, which will be recorded against the car registration number.
• An extensive communication campaign will be carried out ensuring the new system
is widely publicised via multiple communications channels. 
• A number of same day booking slots will be made available via the system, to
accommodate unexpected demands, subject to availability.
• The system will also support the digital delivery and management of the existing
permit system and policy for householders seeking access with vans and small
trailers, as well as facilitate the review and digitisation of the commercial permit
system on Arran.
• The system will be configured to support family members to be able to deposit
household waste on behalf of elderly NAC residents.
• The system will be implemented as soon as practically possible taking account of
the communication required and the procurement of the system. 
2.8 A one-off implementation cost is estimated to be around £6,500 for tablets and system.
Recurring costs are estimated to be around £5,000 for hosting, licences etc and will be
met from the existing Waste Service revenue budget through savings in waste disposal
costs. 
2.9 The estimated implementation date is 1 April 2025 which will provide sufficient time for
the procurement of the system, configuration and testing of the system, alignment with
MyNac & the Customer Relationship Management (CRM) system and an extensive
communications campaign.   
2.10 An implementation and communication plan will be developed which includes: 
• A cross-service implementation group will ensure that all services and stakeholders
are considered in the implementation strategy and within the communication plan.
This will include Customer Services, Communications, Financial Services,
Procurement, IT, Transformation and the Waste Service.
• A marketing campaign will be undertaken in advance to advise residents of the
implementation of the new digital booking system.
• Providing clear guidance on the implementation of the new digital booking system,
including step by step guidance on how to book using the online system, or through
the Customer Contact Centre for those residents without digital access. 
• New signage will be installed at the gates of each HWRC to advise residents of the
implementation of the new booking system.
• The council’s website will be updated prior to implementation with the details of the
booking system, including a detailed section to answer frequently asked questions.  
19

Page 20

3. Proposals 
3.1  That Cabinet approved the proposal to implement the HWRC Booking System at all
sites on the mainland and on the Isle of Arran. 
4. Implications/Socio-economic Duty
Financial 
4.1 An estimated initial investment cost of £6,500 will be required for the purchase and
installation of the system with ongoing revenue costs of £5,000 per annum. 
Human Resources 
4.2 There are no direct implications for human resources. 
Legal 
4.3 Household Waste Recycling Centres are only licensed for the acceptance of specific
types of household waste. The implementation of a digital HWRC booking system will
assist the council in ensuring compliance with the site waste management licences,
which are issued and regulated by SEPA. 
Equality/Socio-economic 
4.4  The proposal will ensure that HWRCs are equally accessible for all customers. 
Environmental and Sustainability 
4.5  The implementation of a HWRC booking system will support the promotion of a
circular economy in North Ayrshire to reduce consumption of raw materials and
promote reuse and recycling. 
Key Priorities 
4.6  The proposal supports the Council Plan strategic priority to be a sustainable council,
through supporting the effective governance and management of resources. 
Community Wealth Building 
4.7  The implementation of the HWRC booking system contributes to being a Community
Wealth Building Council that is efficient and accessible, maximising investment and
focusing resources towards our priorities, and by supporting the reuse and recycling
of waste, helping to reduce carbon emissions and contributing to the mitigation of
climate change.  
20

Page 21

5. Consultation
5.1 Consultation has taken place with Customer Services, Transformation, IT and
Procurement. A report was taken to the Policy Advisory Panel on 10 September 2024
and feedback was positive.
RUSSELL McCUTCHEON 
Executive Director (Place)
For further information please contact Thomas Reaney, Head of Service (Neighbourhood
Services), on 01294 324570. 
Background Papers
0
21

Page 22

Page 1 of 6
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
Audit and Scrutiny Committee 
Household Waste Recycling Centre Digital Booking System
Overview
A proposal to implement a digital Household Waste Recycling Centre (HWRC) booking system
at all sites was approved by Cabinet on 1st October 2024. The council operates three sites on
the mainland (Irvine, Kilbirnie and Largs) and one on the Isle of Arran in Brodick. 
The proposal had previously been presented to the Policy Advisory Panel on 10 September 2024
and members present were broadly satisfied with the proposal.
Proposal
The proposal sought approval to implement a digital Household Waste Recycling Centre
(HWRC) booking system at all sites (Irvine, Kilbirnie, Largs and Brodick) from April 2025. 
Householders will be able to book online via the Council’s website or, if this is not possible, by
telephoning the Customer Contact Centre, or in person at the local offices in Irvine, Largs,
Saltcoats and Arran. 
How will it operate?
A digital booking system will allow customers to book slots at HWRC sites at a time convenient
to them and this will enable staff to help offload their household waste safely and correctly,
minimising contamination and improving reuse and recycling, while avoiding queues at peak
times.
Booking systems have already proved successful in a number of other local authority areas in
Scotland, including at both South and East Ayrshire, and are widely used throughout the UK to
assist in making visits to the sites smoother and quicker. 22 of the 32 Scottish Councils (approx.
69%) have a type of booking system in place within their HWRCs. The extent of the use of
booking systems can vary by individual sites and can be used and applied to vans, trailers and
all cars.
The Corporate Transformation Team conducted research with 5 Scottish and 2 English councils
that have already implemented digital HWRC booking systems to identify best practice to
support the implementation of a digital booking system within North Ayrshire’s HWRCs. 
The digital booking system proposal aims to ensure that the HWRCs can still be easily accessed
by householders, while improving traffic management and employee and visitor safety,
enhancing the customer experience, reducing pollution from vehicle queuing/idling, increasing
operational efficiency, preventing access to visitors from neighbouring local authority areas,
ensuring legal compliance with waste management licences by deterring businesses from
depositing their commercial waste illegally in the household waste recycling centres and
avoiding any unnecessary waste disposal costs.
A comprehensive and extensive communication and marketing campaign will be carried out
prior to implementation to ensure that the new system is widely publicised via multiple
communications channels. Comprehensive, clear, step-by-step guidance on the use of the new
digital booking system, including how to book using the system, or through the Customer
Contact Centre and local offices for those residents without digital access. 
To avoid any customers being turned away who are not aware of the new system, if
householders presented at a HWRC without a booking, then a ‘one time’ pass will be issued and
Appendix 3
22

Page 23

Page 2 of 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
recorded against their car registration number and they would still be able to deposit their waste
at the site, allowing guidance and information leaflets to be provided to support their future
access.
A number of same day booking slots will also be made available via the system, to
accommodate unexpected demands (on a first come first served basis) and the system will be
configured to support family members to be able to book and deposit household waste on
behalf of elderly/disabled NAC residents.
Consultation and Engagement
Consultation has taken place with the relevant internal council services, including Customer
Services, Transformation, IT, Communications and Procurement. 
Discussions also took place with employees from the service and the full time Trade Union
officials, who are supportive the proposal particularly as it reduces the risk of violence and
aggression incidents. 
The consultation and engagement process included presentations to the Council’s
Transformation Board, a report to the Council’s Executive Leadership Team (ELT), a report to the
Council’s cross-party Policy Advisory Panel on 10th September 2024, a presentation to Trade
Unions on 5th September 2024 prior to being presented to Cabinet on 1st October 2024.
The Cabinet report of 1st October 2024 describes how an extensive communication campaign
would be carried out ensuring the new system is widely publicised via multiple communications
channels, to ensure that all householders are aware of the implementation of the new system.
Research conducted by the Corporate Transformation Team with councils who had
implemented a booking system, suggests that high levels of customers use the online booking
service, with some councils reporting that over 95% book online with low percentages opting to
book through either phoning Customer Contact Centres or visiting local offices.  During
engagement on the development and implementation of the Council’s Digital Strategy, 95% of
all respondents indicated they had access to the internet and emails and the preferred method
of receiving information was through digital.
Other Councils advised that no public consultation was carried out prior to implementation of a
digital HWRC booking system, however customer satisfaction surveys took place after
implementation to support improvements in the use of the booking system. It is proposed that
North Ayrshire Council adopt a similar approach to ensure the booking system is continually
optimised to take cognisance of site-specific circumstances and learn from customer
experience and feedback.
South Lanarkshire Council reported that the booking system for Carluke HWRC continues to
receive positive feedback from site users. A review of the responses received during 2023/2024
showed that over 95% were satisfied with their experience of using the site, 97% were satisfied
with availability of slots; and more than 98% of respondents rated the booking system easy to
use. South Lanarkshire Council have now implemented at all their sites given the positive
feedback. 
Customer Satisfaction
During 2023/24, several customer complaints were received regarding the HWRC’s being
closed, which can occur as a result of emergency issues, or to allow for the delivery of essential
staff training.
23

Page 24

Page 3 of 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
The implementation of a digital booking system would provide the ability to send bulk
notifications and reminders to customers regarding emergency site closures, and to allow for
the closing of booking times for short durations at individual sites during quieter periods, to
allow for the delivery of essential staff training, therefore avoiding customers turning up at sites
during essential closures.
Since the proposal to implement the digital booking system was announced, Customer
Services has reported that only a small number of complaints have been received objecting to
the proposal. 
It should be noted that when South Lanarkshire Council piloted a booking system at one site
and then decided to roll out across South Lanarkshire, the feedback from users of the system
was positive whilst feedback from those who hadn’t used the system yet was negative. 
Traffic Management / Health & Safety
Traffic congestion can cause concerns over the volume of vehicle movements within sites, at
the HWRC sites at peak times, particularly at Bartonholm in Irvine, which is the largest and most
used site. 
HWRC staff at the Bartonholm site have reported that they regularly record queues of between
30 and 40 cars at the site at weekends and on occasions as many as 50 to 60 cars queuing.
A Waste Technical Officer reviewed CCTV footage from Sunday 13th October 2024, which
recorded a non-stop stream of 186 cars approximately between 12:25pm and 14:05pm. 
Unfortunately, when large queues form it can result in violence and aggression incidents
towards employees and also amongst members of the public who try to skip the queue. Some
of the employees’ comments on the introduction of a digital booking system are as follows:
‘When there’s queues, we have to deal with traffic management and irate customers – with
a booking system this would be controlled due to a certain number only accessing the site
at one time.’
‘It’s difficult to maintain the machinery when you don’t know the volume of customers
attending the site each day, if customers were booking in advance, we could pre-plan
maintenance of certain machines. The maintenance and upkeep of the machines is really
important to stay operational.’
‘It would also allow more time to sort out tv’s, fridges etc which goes towards improving
the recycling figures for NAC.’
‘I think the booking system would help deal with the abuse we get because customers
would be told when booking, what waste was acceptable and what wasn’t. Not everyone
checks the website for this information however when booking online all the info will be
there.’
The GMB Trade Union Rep and Site Attendant also commented ‘All in all, I feel this a positive
step and I really hope this gets taken forward.’ 
Police Scotland have also visited Bartonholm HWRC during busy periods, as cars have been
causing traffic congestion and blocking the road. 
The booking system would be configured to maximise the number of visitor slots that can be
safely managed at each site, without requiring cars to queue at peak times, and the experience
24

Page 25

Page 4 of 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
shared from other councils is that the level of visitors balance out once introduced, particularly
at peak times.
Fly-tipping
The Department for Environment, Food and Rural Affairs (DEFRA) commissioned detailed
research in November 2022 to explore the ‘possible links between Household Waste Recycling
Centre booking systems and incidents of flytipping - EV04102’, which can be found online at
https://randd.defra.gov.uk/ProjectDetails?ProjectId=21149.
The research surveyed 54 English Local Authorities who have implemented HWRC booking
systems and noted that 43% of LA’s in England have some form of booking system in place. The
research suggests that based on the data available, that there is no indication that a link
between a booking system and increased fly-tipping exists. 
The Corporate Transformation Team and the Waste Service carried out research with both
Scottish and English councils that have implemented a booking system at their HWRCs.
Research has shown that councils who have implemented a booking system have not
experienced a visible increase in fly tipping following its inception.
Under the current process at North Ayrshire, the smaller sites are required to close when the
skips are full and require to be serviced, particularly at peak times, which can lead to fly tipping
at the gates, or in remote locations near to the sites. The implementation of a digital booking
system would even out the number of visits and the associated tonnages over the opening
hours. This will enable the Council to schedule skip servicing and thereby reduce the need to
close sites due to skips being full. 
The implementation of a digital booking system could support the avoidance of fly-tipping near
HWRCs, due to certainty of access for the public at the times booked, meaning customers
would never have to leave a site with a vehicle full of waste.
The proposed HWRC booking system includes the provision of a ‘one time’ pass, should a
customer present at a site without a booking, which will be recorded against their car
registration number and this process will allow the customer to deposit their waste. The
inclusion of a ‘one time’ pass will provide flexibility for householders when visiting the HWRCs
and support their transition to the new system, and therefore mitigate the likelihood of any
household waste being fly-tipped. 
The proposal includes continual and close monitoring of all reported fly tipping cases by the
Streetscene Environmental Enforcement Team, to ensure that cases are recorded, duly
investigated and enforcement action taken where necessary. The fixed penalty for fly-tipping
increased to £500 from 1st January 2024 and the Circular Economy (Scotland) Act 2024 also
introduces additional measures for local authorities to address fly-tipping, which includes the
ability to seize vehicles. A new UK wide Digital Waste Tracking System is scheduled to be
introduced on 1st April 2025, which will record waste movements and help identify
discrepancies to regulatory bodies including SEPA, particularly from rogue traders. The
combination of these new measures is expected to help combat those that fly-tip their waste. 
HWRC Performance & Compliance
Of the 5 Scottish councils contacted who have implemented a booking system within their
HWRCs, none of them advised that their recycling performance has been negatively affected
following implementation of the booking system. Both English councils spoken to advised that
25

Page 26

Page 5 of 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
although the total waste tonnages reduced, improvements were observed in their recycling
rates at their sites.
North Ayrshire collected approximately 11,114 tonnes of waste from the four recycling centres
in 2023/24. Of these 5,694 tonnes of waste (51.2%) was source segregated at the sites, with the
remaining 5,420 tonnes of waste (48.8%) being deposited in the mixed residual waste skips and
requiring further mechanical sorting, indicating that there is significant scope for improving the
source segregated reuse and recycling performance at the recycling centres. 
The total waste arisings collected from the four household waste recycling centres over the past
two years has increased by 3.8% from 10,702 tonnes in 2022/23 to 11,114 tonnes in 2023/24
(+412 tonnes).  
Residents from neighbouring authorities may also potentially utilise the recycling centres, as
the Kilbirnie HWRC is closer for residents just inside the Renfrewshire boundary, than visiting
their nearest site in Johnstone. 
South Ayrshire Council introduced their HWRC booking system in July 2022 and East Ayrshire
Council extended their existing HWRC booking system in June 2020 to include all vehicles
during the Covid-19 pandemic. The operation of the booking systems for all vehicles at
neighbouring Ayrshire authorities may have been a contributory factor to the increase in HWRC
arisings at North Ayrshire’s sites since 2022/23. Since the North Ayrshire Digital Booking System
was approved by Cabinet and reported in the press, there has been social media posts
indicating East Ayrshire residents who don’t book a slot at their local HWRC and travel to North
Ayrshire HWRCs which incurs an unnecessary cost for North Ayrshire Council.
A HWRC booking system can be used to support householders in the separation of their waste
for reuse and recycling by providing them with information regarding the waste types that can be
accepted and separately collected at each site in advance of their visit, with an electronic
layout map of the relevant site to aid packing of their vehicles in the correct order, therefore
helping them to source separate their waste prior to their visit. 
The HWRC site attendants would have more time during busy periods to provide help and
advice to residents, to ensure that the materials go in the right skip etc, as well as being able to
avoid contamination, such as preventing items that should not be deposited in the sites, and
which can contaminate a whole skip of recyclable material, such as asbestos, paint, oils etc. 
There will also be an option for anyone requiring assistance to indicate this when booking a slot,
this will enable a member of staff to look out for and assist the resident. This isn’t always
possible at peak periods. 
Household Waste Recycling Centres are only licensed for the deposit and acceptance of
specific types of household waste, in accordance with a specific waste management licence
that is issued for each site by the Scottish Environment Protection Agency (SEPA). The
implementation of a digital HWRC booking system will assist the council in ensuring
compliance with its’ statutory duty to comply with the site waste management licences, as well
as helping to prevent waste types entering the sites which are not compliant with the existing
licences (asbestos, commercial waste etc.). 
Conclusion
The proposed introduction of a digital Household Waste Recycling Centre booking system
would provide a range of benefits including improving traffic management and employee/visitor
safety, reducing the risk of violence and aggression incidents and enhancing the customer
26

Page 27

Page 6 of 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
experience and reducing pollution from vehicle queuing/idling. A system would help to increase
operational efficiency while preventing unauthorised access from visitors from neighbouring
local authorities and businesses, ensuring the Council is compliant with the site waste
management licences regulated by the Scottish Environment Protection Agency (SEPA). 
The digital booking system proposal aims to ensure that the HWRCs can still be easily
accessed, facilitated through a simple and easy-to-use booking system, which includes
providing a number of same day booking slots to accommodate unexpected visitor demand
with the system being configured to support family members to be able to book and deposit
household waste on behalf of elderly NAC residents. If anyone doesn’t wish to use the digital
method or can’t use the digital method then a booking can still be made through telephoning
the Customer Contact Centre or by visiting a local office.
Streetscene’s Environmental Enforcement Team will continue to closely monitor fly tipping
cases, duly investigating them and taking the necessary enforcement action where appropriate.
Implementation of the system would be supported by a comprehensive and extensive
communication and marketing campaign, with clear step-by-step guidance made available to
residents on the use of the new system in advance of implementation. Easy to follow guidance
leaflets would also be made available to support any householders that may attend the sites
without having made a prior booking during the implementation period. 
There is also an unintended consequence if this proposal is not progressed in terms of staff
morale and the health, safety and wellbeing of employees. 
Thomas Reaney
Head of Neighbourhood Services
21 October 2024 
27

Page 28

28

Page 29

- 
NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee 
Title:    Elected Member Development 
Purpose:  To provide information and seek views on the development
sessions provided to Elected Members over the 13 months from
August 2023 to August 2024, and on future planned
development sessions. 
Recommendation:  The Committee is recommended to (a) note the report on the
Elected Member Development sessions held in the period
August 2023 to August 2024; (b) note the future development
sessions scheduled to date; and provide feedback on (c) the
means to support Elected Member attendance; (d) how future
programmes might be improved and (e) to suggest additional
topics for the next year. 
1. Executive Summary 
1.1   This report provides information on development support provided to Elected Members
during the period August 2023 - August 2024, on attendance rates, feedback from
current activities and on future planned development. 
2. Background 
2.1  An annual report is provided to Audit & Scrutiny which details the Council's learning
events programme for Elected Members and individual Elected Member attendance
figures.  This report provides information for the period August 2023 until Aug 2024
inclusive. 
2.2 The Audit Commission report on “Roles and Working Relationships - Are you still
getting it right?” emphasised that Councillors need the skills and tools to carry out
their role. This includes training in relation to both Council and ALEO responsibilities,
as well as scrutiny, audit and financial decision making. Finally, it noted that training
and development should be an ongoing process, not a one-off induction.   
2.3 North Ayrshire Council has continued to offer a full training programme for Members
in addition to e-learning and the opportunity to attend Improvement Service events
and webinars. The number of internal development sessions from Aug 23 – Aug 24
was 10 sessions, with an average attendance of 8 Members per session. Individual
Agenda Item 4
29

Page 30

Member attendance from Aug 2023 to Aug 2024 varied between attendance at 8
sessions to attendance at none. 
2.4 Appendix 1 contains details of the development that has taken place between Aug 23
and Aug 24 and includes the internal sessions plus any e-learning that Elected
Members completed.   
2.5 Overall there were 79 separate Member attendances at development sessions
between Aug 23 and Aug 24. These figures include those aimed at specific committee
members (i.e. Appeals Committee).   
2.6   The Council offers members an annual 1-2-1 PDP discussion to discuss their
development needs.  This was offered as part of a Member’s development survey but
there was no take up.  Take up for this is historically low and indeed there was no
interest the last time it was offered. 
2.7 Council previously agreed that all Members who sit on the Appeals Committee should
receive training before they sit on the Committee. An externally facilitated session was
held in August 2024 with two Members attending. 
2.8 Members can provide feedback by electronic means on sessions attended. For the
period Aug 23 – Aug 24 the feedback response rate was 26%. The sessions are rated
1-5 by respondents on content, handouts, presentation, friendliness of tutor, relevance
and overall service provided.  The feedback is primarily positive with only two ratings
of 3 and everything else a 4 or 5. Generally training is well received with Members
confirming that their skills/knowledge has increased by attending the training. A
breakdown of the evaluations received for all sessions for this 13 month period is
included in Appendix 2. 
2.9 In addition to this there is learning available from the Improvement Service (IS) in the
form of Briefing notes, masterclasses, newsletters and more recently webinars.  Our
own intranet Connects site also hosts information, such as the slides from learning
events. There is also e-learning available through iLearn. This is shown on the table in
Appendix 1. 
2.10 Further to Audit and Scrutiny feedback in 2023 a short survey was issued to Elected
Members.  Five responses were received.  Questions primarily related to the format of
development events, timings, pace, etc.  Based on the feedback received, Members
considered that the ideal session would be face-to-face on a Monday or Wednesday
morning lasting under 2 hours.  Some feedback was also received on potential topics
for development and these will be actioned with the appropriate person where
appropriate.  It is not possible to find dates that suit every Member but when any
session is arranged face-to-face with a hybrid option is the preferred option and
diaries are always checked and the most suitable date selected based on maximum
Elected Member availability. 
2.11 Members and Officers are consulted on future training topics and any views from the
Committee are also welcome. The Elected Member Learning and Development Event
Schedule for the first half of 2025 will be published in due course.  The schedule for
the remainder of 2024 (Sep – Dec) is included in Appendix 3. 
30

Page 31

2.12 In conclusion, whilst the Council continues to offer an extensive development
programme for Members, it is important that the Committee has the opportunity to
review the current development arrangements and offer suggestions. 
3. Proposals 
3.1   The Committee is recommended to note the report a) on the Member Development
sessions held in the period August 2023 to August 2024, b) the future development
sessions scheduled to date; and provide feedback on c) the means to support
Member attendance d) how future programmes might be improved and e) to suggest
additional topics for the next year. 
4. Implications/Socio-economic Duty 
Financial 
4.1  Investment in development produces more informed decisions and better outcomes. As
this supports good governance and better decision making, Elected Member
development continues to be an area of focus in terms of Best Value activity. 
Human Resources 
4.2   Effective development is key to keeping North Ayrshire Council as a high performing
Council. 
Legal 
4.3  Effective development is a key component of good governance, leading to better
decisions. 
Equality/Socio-economic 
4.4  Effective equalities training is essential for Members. Training in equalities assists
Members to develop policy and inform decision making processes whilst ensuring that
appropriate equalities impacts are taken into account. 
Climate Change and Carbon 
4.5  No Implications.  
A session on Environmental Sustainability and Climate Change is planned for next year.
Key Priorities 
4.6  Sharing of information and knowledge through briefings and development sessions with
Elected Members supports the delivery of all priorities outlined in the Council Plan. 
Community Wealth Building 
31

Page 32

4.7  There are no direct community wealth building impacts although trained and skilled
Members will be better placed to support their communities. A session on the
Community Wealth Building refresh is planned for next year. 
5. Consultation 
5.1 The Learning and Organisational development team have been involved in the
preparation of this report. All sessions have been evaluated. 
Aileen Craig
Head of Democratic Services 
For further information please contact Paul Houston, Learning and Organisational
Development Adviser, by email on phouston@north-ayrshire.gov.uk 
Background Papers
None 
32

Page 33

Appendix 1 - Learning & Development Attendance Aug 23 - Aug 24  
  
SFRS Prevention &
Engagement
Strategy, Operational Response 
Tree Planting Strategy
Digital Connectivity Update
Cyber Security Update 
Housing Services Update 
Building Services Update
Cyber Security Update
Next Steps for Community W
ealth
Building 
Appeals Committee 
Remodelling Care Options 
Trauma Informed Practice e-
learning
Cyber Security Essentils e-learning
  
Alan Hill      Y        1
Amanda Kerr              0
Angela Stephen              0 
Anthea Dickson  Y  Y  Y  Y   Y   5 
Anthony Gurney    Y Y Y        3 
Cameron Inglis  Y Y  Y  Y Y Y Y Y   8 
Chloe Robertson    Y  Y        2 
Christina Larsen   Y Y  Y  Y      4 
Davina McTiernan   Y Y  Y  Y Y  Y   6 
Donald L Reid  Y  Y Y Y Y Y   Y Y  8 
Donald Reid   Y   Y Y Y   Y   5 
Eleanor Collier   Y   Y   Y    Y 4 
Ian Murdoch         Y  Y   2 
Jean McClung      Y        1 
Jim Montgomerie              0 
Joe Cullinane              0 
John Bell   Y Y Y Y  Y Y  Y   7 
John Sweeney  Y  Y  Y Y Y      5 
Louise McLaughlan              0 
Margaret Johnson  Y Y  Y Y  Y   Y   6 
Marie Burns      Y     Y   2 
Matthew McLean         Y Y    2 
Nairn McDonald  Y            1 
Robert Foster              0 
Ronnie Stalker   Y           1 
Scott Davidson              0 
Scott Gallacher              0 
Shaun Macaulay              0 
Stewart Ferguson  Y   Y Y Y       4 
Timothy Billings      Y Y       2 
Todd Ferguson              0 
Tom Marshall              0 
Totals  7 8  8  6  16  6  9  6  2 9 1 1 79 
33

Page 34

Appendix 2 – Evaluation Feedback from Aug 2023 – Aug 2024 
Note
The scale runs from 1 (Dissatisfied) to 5 (Satisfied) on all of these ratings, with the
exception being Overall which is presented as 1 (Dissatisfied) to 5 (Delighted).
Development Session Content
Handouts and
presentations
Presentation
of the session Tutor Relevance Overall
Has the
session
increased your
knowledge
and/or skills?
20 Nov 2023 - Digital Connectivity Update 5 4 5 5 5 5 Yes
20 May 2024 - Housing Update 4 3 4 4 4 4 Yes
20 May 2024 - Housing Update 5 5 5 5 5 5 Yes
20 May 2024 - Housing Update 5 5 5 5 5 5 Yes
20 May 2024 - Housing Update 5 5 5 5 5 5 Yes
23 May 2024 - Building Services 5 5 5 5 5 5 Yes
23 May 2024 - Building Services 5 4 4 5 4 4 Yes
23 May 2024 - Building Services 5 5 5 5 5 5 Yes
23 May 2024 - Building Services 5 5 5 5 5 5 Yes
29 May 2024 - Cyber Update 5 5 5 5 5 Yes
29 May 2024 - Cyber Update 4 4 4 4 3 5 Yes
26 Aug 2024 - Re-modelling Care Options 5 5 5 5 5 5 Yes
26 Aug 2024 - Re-modelling Care Options 4 4 4 5 4 4 Yes
26 Aug 2024 - Re-modelling Care Options 5 5 5 5 5 5 Yes
26 Aug 2024 - Re-modelling Care Options 5 5 5 5 5 5 Yes
26 Aug 2024 - Re-modelling Care Options 5 5 5 5 5 5 Yes
26 Aug 2024 - Re-modelling Care Options 5 5 5 5 5 5 Yes
2 Sept 2024 - Procurement Overview 5 5 5 5 5 5 Yes
2 Sept 2024 - Procurement Overview 5 5 5 5 5 5 Yes
2 Sept 2024 - Procurement Overview 5 5 5 5 5 5 Yes
34

Page 35

Appendix 3 – Elected Member Development Schedule Sep – Dec 2024 
Date Topic Delivered by  Lead Comments     
2 Sept 2024
(11am – 12noon) 
(Teams)
Procurement Overview & Activity  Suzanne Quinn  Mark Boyd   This procurement presentation gives a high-level overview of
procurement. It includes information relating to the
procurement procedures most commonly used, it details the
procurement process itself, and it outlines the internal and
external governance that surrounds public sector procurement.
The presentation will also provide detail of procurement activity
for the last financial year, which includes the volume of
procurement exercises carried out, the total spend by category
(including local and anchor spend) and the volume and types of
community benefit delivered. 
16 Sept 2024
(9:30am – 12:30pm) 
(In person)
Launch of New Members Account
& overview of MyNAC and Online
Forms
Craig
Valentine/Elaine
Nixon
Fiona Walker On 1 October we will be launching a new Member's Account
using MyNAC. This session is to introduce you to the new
account and show you how easy it is to set up and use. The new
account will work in a similar way to the old one, but with a
more modern look and feel.
We will also demonstrate the customer MyNAC account and
some of the new online forms we have launched over the last
couple of years. This includes forms for Waste, Streetscene,
Licensing, Housing and Council Tax. Not only are these forms
better for the customer, but they make it easier for the service
to receive, manage and process saving the Council time and
money.
35

Page 36

Date Topic Delivered by  Lead Comments
30th Sept 2024
(10:00am – 12noon) 
(Hybrid) 
Community Asset Transfer Lesley Forsyth  Rhonda Leith  This session will focus on Community Asset Transfer within
North Ayrshire, including the legislation, process and support
available for community groups as well as how CAT fits into the
wider community empowerment agenda. 
25th Nov 2024
(9:30 – 10:30) 
(Teams)
Cyber Security Awareness Gavin Alston /
Fraser
Cunninghamme /
Stephen Quigley /
James McNeil
Fiona Walker In this session the Cyber Security Team will provide an update
on the current cyber security threat landscape and how it
affects the Council. The update will incorporate real world
examples and give advice on how we can all better protect
ourselves and the Council against the ever-present threat of
cyber-attack. 
26th Nov 2024
(9:30 – 10:30) 
(Hybrid)
Councillor Code of Conduct Aileen Craig Aileen Craig This session will provide an update on guidance changes to the
Councillor Code of Conduct and recent cases considered by the
Standards Commission.
11th Dec 2024
(9:30 – 10:30) 
(Hybrid)
Planning Allan Finlayson
(Senior Manager
(Planning) /
Raymond Lynch
(Senior Manager
(Legal)
David
Hammond
This session is for Planning Committee and LRB Members only. 
Course content to be confirmed
36

Page 37

Date Topic Delivered by  Lead Comments
17th Dec 2024
(9:30 – 10:30) 
(Hybrid)
Planning Allan Finlayson
(Senior Manager
(Planning) /
Raymond Lynch
(Senior Manager
(Legal)
David
Hammond
This session is open to all Members.  Course Content TBC 
37

Page 38

38

Page 39

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee
Title: Year End Performance Reporting 2023-24
Purpose: To advise the Audit & Scrutiny Committee of progress on
Council Plan priorities and the Council Plan Year End
Performance Reporting
Recommendation: Audit and Scrutiny agrees to note: (i) Our Council Plan Six
Monthly Progress Report attached at Appendix 1; (ii) the
Council Plan Annual Performance Report as set out in
Appendix 2 and (iii) the status of the council’s performance
within the LGBF Analysis of 2024 Data Release at
Appendix 3. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our council and details
our council’s strategic priorities. We have a statutory duty to publish information
that enables effective scrutiny of our performance. A report on progress with
Council Plan priorities and Council Plan performance reporting was presented to
Cabinet on 27th August 2024. Cabinet approved the report and agreed that it be
referred to the Audit & Scrutiny Committee for further consideration.
1.2 This report combines three key Council Plan and corporate performance reports:
• Our Council Plan Six Monthly Progress Report (1st October to 31st March
2024)
• Our Annual Performance Report 2023/24
• The Local Government Benchmarking Framework (LGBF) - Analysis of April
2024 Data Release 
2 Background 
2.1 Under the Local Government (Scotland) Act 1992 and Local Government in
Scotland Act 2003 we have a duty to demonstrate Best Value. To ensure we
support our residents, fulfil our statutory duties and invite scrutiny, we actively
manage performance and develop our reporting to make it accessible and
engaging.
Agenda Item 5
39

Page 40

2.2 Our new Council Plan 2023-28 was approved by Council in June 2023.
2.3 Our Council Plan Six Monthly Progress Report (1st October to 31st March
2024) and accompanying appendices provide detailed information on the
progress made towards our strategic priorities. The report includes key activities
and case studies from across our council in a magazine style format. It provides
an overview of performance over the six months ending 31st March 2024 as well
as our next steps.
2.4 Our Annual Performance Report 2023/24 summarises our performance across
the full financial year. The Annual Performance Report is a high-level summary
with links to our more detailed six-monthly Council Plan Progress Reports to
avoid duplication.
2.5 The Local Government Benchmarking Framework (LGBF) Analysis of 2024
Data Release provides information on how we compare to similar councils. The
LGBF is a national framework collating performance information from across all
32 local authorities and is specifically referenced within the Accounts
Commission Strategic Performance Information Direction. This report mainly
covers 2022/23 data as released during 2024, some information may relate to
more recent periods. Data is as downloaded in April 2024 unless otherwise
stated.
2.6 The Inclusive Growth Dashboard provides a contextual overview of North
Ayrshire, it is currently being reviewed and will be available in 2024/25 for use
within our reporting. However contextual indicators as outlined in our Council
Plan Performance Management Framework are included in the report.
3 Assessment of Performance 
3.1 There are 47 actions within Our Council Plan, with one reported directly through
the HSCP and therefore excluded from this report. One action “CP_29 Promoting
new woodland creation and protecting our green spaces to provide a natural
resource for carbon sequestration” is slightly adrift of target (see 3.2 below for
related performance indicator commentary), the remaining 45 actions are all on
target at Year End.
3.2 There are 26 performance indicators (PIs) within our framework. At Year End
88.2% of indicators where data is known were either on or only slightly adrift of
target (17 indicators). Two indicators were significantly adrift of target, these are:
• CP_29 Overall carbon emissions (tonnes) (Non-domestic Council estate)
For 2023/24, the total carbon emission figure is 20,745tCO2e against a target
of 19,500tCO2e. However, this is a 0.72% reduction from 2022/23 emissions,
and 69.4% reduction from our 2005/06 baseline year. When calculating our
council’s carbon emissions, we consider fossil fuel usage from employee
travel, fleet transport, waste, street lighting, KA Leisure buildings and our non-
domestic estate (including PPP schools).
40

Page 41

There is an increase in emissions associated with our non-domestic estate
when compared with the previous year, specifically caused by heating fuels.
We will analyse our properties with excessive energy demand to determine
the best approach.
Following increased capacity within the Sustainability Team, energy
management practices will be reinvigorated to scrutinise energy use, instil
behaviour change and deliver carbon reduction projects. Behaviour change
will be encouraged through an employee energy awareness campaign which
includes utilising our Leadership Programme, other internal communication
channels and a new training module prior to the heating season beginning in
September.
• CP_46 Number of trees planted under the North Ayrshire 2030 Tree
Planting Strategy
The total number of trees planted at the end of 2023/24 was 36,366, which is
slightly lower than the projected target of 40,000, however the total number of
trees planted within the first three years of the strategy is on track to achieve
the overall target of 108,000 trees to be planted by 2030, with six years of the
strategy remaining. We have made a conscious decision to defer planting at
one of our larger key planting sites to allow for the regrading of soil from
another area of the same development site, which will reduce the associated
development costs to the council. The planting at the site will commence after
the soil regrading works are complete.
The level of response from the Woodland Grant Fund applications in 2023/24
was not as high as expected, so we will be looking to do more publicity
around the grant funding this year to hopefully improve the level of uptake in
the next round. The 2024/25 Woodland Grant Fund will be opened and
widely advertised in the autumn, which will support local tree planting projects
including the creation of new community orchards. The Streetscene Service
is also currently reviewing several potential planting sites for developing new
tree planting proposals for the 2024/25 tree planting season.
3.3 Overall the first year of Our Council Plan 2023-28 performance appears strong.
Key highlights are detailed in the following section.
3.4 Within the LGBF Analysis of April 2024 Data Release the majority of PI data
relates to 2023/24. The analysis focusses on 33 LGBF measures that directly
link to our priorities. These include LGBF indicators included in our Council Plan
Performance Management Framework and additional indicators that relate to our
priorities. It should be noted this April 2024 data release relates to a time period
prior to the current Council Plan, however the plan builds on progress made
during the previous Council Plan to drive immediate and longer-term sustainable
improvements for our residents. As a result, the analysis of these PIs is still valid
for this time period.
3.5 Of the 33 LGBF priority indicators, 25 have data for 2022/23. During 2022/23
eight priority PIs were within the top quartile (32%) and six were within the
41

Page 42

second quartile (24%). Top quartile performance includes areas such as crisis
grant payments, proportion of pupils entering positive destinations, household
waste recycling and rent arrears.
3.6 68% of our LGBF priority indicators demonstrate improved performance in the
short term (one year comparison of 25 PIs with data) and 4% remain unchanged.
For the same number of PIs over the medium term (three years), 60% have
improved and 4% remain unchanged. Long term (10 years) 93.75% of indicators
have improved (based on 16 PIs with comparable data).
3.7 This LGBF analysis supports the Council Plan Progress Report findings that our
council performance against our priorities appears strong. The information from
the LGBF is being used by teams to improve and maintain our performance.
3.8 Key Highlights
• We established a Financial Inclusion Partnership to increase access to
financial advice and support for our residents. For example, our Debt Advice
service which commenced in summer 2023, has exceeded its referral target of
245 as at 31st March 2024.
• We are funding two additional School Welfare Rights Officers providing
financial advice and assistance to parents and carers. This is based on strong
evidence, with our current School Welfare Rights Officer obtaining £560,509
for secondary school parents during 2023/24. This is an average of £5,387
per referral.
• We agreed to provide a £50 clothing grant to all eligible three and four year
olds in Early Years during the 2024/25 school year to help with the cost of
living.
• We were awarded £79,181 to proactively support residents in accessing the
support they are eligible for following a successful grant application to the
Scottish Government Child Poverty Practice Accelerator Fund (CPAF).
• All eight mainland Secondary Schools now have access to mentoring services
following the successful recruitment of MCR Pathway Co-ordinators with
discussions in progress to deliver the service to Arran High School.
• Our council approved a definition to enable care experienced to be treated as
a protected characteristic within our Equality and Children’s Rights Impact
Assessments (ECRIAs).
• 378 empty homes have been brought back into use during 2023/24, this is
significantly above the annual target of 200.
• 384 new building housing units are reaching completion, again significantly
above the annual target of 295.
• 2.05% of council budget is directed via participatory budgeting methods,
higher than our target of 1.5% and national target of 1%.
• Our Community Investment Fund has approved funding for 13 applications
over the year, totalling £721,912.
• To date, 53 council assets have been transferred to community management.
• Our Local Heat and Energy Efficiency Strategy (LHEES) and accompanying
Local Heat and Energy Efficiency Strategy - Delivery Plan were approved by
Cabinet on 23rd January 2024.
42

Page 43

• We launched a £350k Community Net Zero Carbon Fund, enabling local
community groups to bid for funding to help with feasibility and / or renewable
energy technologies on land or buildings they own.
• Our council's solar PV farm developments have progressed to construction
stage. Both Nethermains and Shewalton site clearances have been
completed, with fencing being installed and consideration being given to
provision of mammal gates to support biodiversity on the sites.
• Our council continues to support wider action on climate change. Four
community renewable projects have been awarded funding through the
Community Renewable Energy Generation Fund, totalling approx. £130,000.
• 2,015 households were assisted to furnish their homes in North Ayrshire due
to our bulky waste reuse partner Cunninghame Furniture Recycling Company
collecting and processing reusable items such as mattresses and furniture.
• 36,366 trees have been planted to date across North Ayrshire through various
projects and by community partners.
• 209 businesses were supported to reduce their environmental impact.
• Our Council Plan 2023-28 was approved by Council in June 2023. Developed
with our communities, our Council Plan is our contract with our residents.
• Our first Best Value Thematic Audit on ‘Leadership of the Development of the
Council’s Strategic Priorities’ showed our council “continued to demonstrate a
strong culture of continuous improvement”. Engagement with our
communities in jointly creating our Council Plan 2023-28 was also highlighted.
• As part of our ‘No Wrong Door’ approach, we have created a new streamlined
customer referral process. This new process will ensure that customers only
share their information with us once and are directed to the most appropriate
service provider (internal council services and external support services).
• Our council secured an award of £242,000 from the UK Government's
Department for Science, Innovation and Technology (DSIT) to advance
wireless infrastructure and 5G technology. We were one of six successful
local authorities and the only one in Scotland.
• Council approved a balance budget for 2024/25. 
3.9 Key Next Steps
These next steps were as at 31st March 2024 and at time of writing these areas will be
progressing or may be complete. Details of our performance will be included in our
Mid-Year report.
• We will progress our Single Shared Assessment approach which enables
consent to be obtained from our residents which will allow us to actively assess
the support available.
• We will publish our British Sign Language Plan.
• We will refresh our strategic approach to tackling poverty through the work of
our Child Poverty and Cost of Living Board.
• We will develop a Pathfinder project with the Scottish Government which will
focus on a place based, person centred approach to tackling child poverty.
43

Page 44

• We will continue making our play areas more accessible and inclusive by
extending regeneration works to 15 additional sites.
• We will work with our third sector and other partners to ensure our Participation
Strategy meets the needs of our communities.
• We will continue to develop our locality planning model as the central way for
residents to be involved in local decision-making including working with
communities to develop their six locality action plans for 2024/25.
• We will continue to work with communities to co-design and deliver our
participatory budgeting processes.
• We will develop streamlined ways for communities to find information about
support, including funding available for our residents.
• We will continue to provide support for communities interested in making
greater use of council assets, including through the Community Asset Transfer
process, and use feedback to make processes as easy as possible for our
residents.
• We will undertake additional awareness raising activity to increase the uptake
of the Community Renewable Energy Generation Fund.
• We will continue to work with Keep Scotland Beautiful, to support free energy
resources for Secondary Schools.
• We will implement our Local Transport and Active Travel Strategy.
• We will continue to review the current bulky uplift service to align with the new
SEPA guidance.
• We aim to complete the construction of our Fairlie Coastal Path.
• We will continue to embed and evolve our Workforce Planning approach
meetings.
• We will continue to support the Audit Scotland Best Value Thematic Work.
• We will launch a project to develop and improve the quality of Children's Rights
Impact Assessments.
• Awards will be made under the Communities and Place Fund.
• The Participatory Budgeting funding through UKSPF Communities and Place
Fund will take place later in 2024, with a budget of £31,000 available. 
4 Proposals 
4.1 Audit and Scrutiny agrees to note: (i) Our Council Plan Six Monthly Progress
Report attached at Appendix 1; (ii) the Council Plan Annual Performance Report
as set out in Appendix 2 (iii) the status of the council’s performance within the
LGBF Analysis of 2024 Data Release at Appendix 3.
5 Implications/Socio-economic Duty 
Financial
5.1 There are no financial implications arising from this report.
44

Page 45

Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 This report confirms the arrangements for the Council’s compliance with its
duties under the Local Government (Scotland) Act 1992 and Local Government
in Scotland Act 2003 and our commitment to improving public performance
reporting.
Equality/Socio-economic
5.4 There are no equality/socio-economic implications arising from this report.
Climate Change and Carbon
5.5 There are no climate change and carbon implications arising from this report.
Key Priorities
5.6 The Year End Progress Reports enable the effective scrutiny of the delivery of
our Council Plan strategic priorities.
Community Wealth Building
5.7 There are no Community Wealth Building implications arising from this report.
Consultation
5.8 The Executive Leadership Team (ELT) reviewed and scrutinised the report prior
to submission to Cabinet.
Aileen Craig
Head of Service (Democratic)
For further information please contact Isla Hardy, Senior Manager (Policy,
Performance and Democracy), on 01294 324035 or email IslaHardy@north-
ayrshire.gov.uk.
45

Page 46

Our Council Plan 
Six Monthly Progress Report
1 October to 31 March 2024
Appendix 1
46

Page 47

Contents
Our Performance at a Glance ................................................................................................. 1
Welcome ................................................................................................................................. 2
Our Priori�es .......................................................................................................................... 3
Wellbeing ................................................................................................................................ 4
Key Ac�vi�es ....................................................................................................................... 4
Next Steps ........................................................................................................................... 9
Case Study – Welfare Rights Officers ................................................................................ 10
Communi�es and Local Democracy ..................................................................................... 11
Key Ac�vi�es ..................................................................................................................... 11
Next Steps ......................................................................................................................... 12
Case Study – Over 50’s Ac�vity Group.............................................................................. 13
Climate Change..................................................................................................................... 14
Key Ac�vi�es ..................................................................................................................... 14
A Sustainable Council ........................................................................................................... 20
Key Ac�vi�es ..................................................................................................................... 20
Next Steps ......................................................................................................................... 23
Case Study – No Wrong Door ........................................................................................... 24
Audits, Inspec�ons and Accredita�ons ................................................................................ 25
Performance Summary ......................................................................................................... 28
Measures Adri� of Target ................................................................................................. 28
Ac�ons Adri� of Target ..................................................................................................... 30
Indicator Amendments and Recommenda�ons ............................................................... 30
Performance Indicators .................................................................................................... 31
Ac�on Tracker ................................................................................................................... 34
47

Page 48

Our Council Plan Progress Update – Year End 2023-24 Page 1 of 39
Our Performance at a Glance
248 adults engaged
with our Multiply
Projects between
January and March
£160k awarded to
nine projects under
the Communities and
Place Fund
£108,086 awarded to
local community
groups through our
Community
Investment Fund
245 referrals to our
new Debt Advice
Service exceeding the
expected target as at
31st March 2024
£130,000 funding
awarded to four
community renewable
projects through the
Community
Renewable Energy
Generation Fund
Local Heat and
Energy Efficiency
Strategy (LHEES)
approved by Cabinet
in January 2024
209 local businesses
supported to help
reduce their
environmental
impact
52 climate change
and energy lessons
delivered to 22
primary schools
36,366 trees have
been planted as part
of our 2030
Woodland: A Tree
Planting Strategy
2,015 households
assisted to furnish
their homes via our
bulky waste recycling
partner
£79,181 funding
secured from Scottish
Government Child
Poverty Accelerator
Fund
£560,509 in financial
gains delivered to
parents through our
School Welfare Rights
Officer (over £1.6m since
the project began)
48

Page 49

Our Council Plan Progress Update – Year End 2023-24 Page 2 of 39
Welcome
Welcome to our Six Monthly Progress Report on Our Council Plan 2023-28.  This report covers
the period 1 October to 31 March 2024.  We view Our Council Plan as our contract with our
communi�es, ‘our’ plan.  It is an ac�ve commitment to support our residents and deliver on
our joint priori�es.  Our four priori�es are Wellbeing, Communi�es and Local Democracy,
Climate Change and A Sustainable Council.  
Overall, our delivery of our Council Plan is making good progress.  At year end 88.2% of our
indicators with data and 100% of our ac�ons are either on target or only slightly adri�.  We
benchmark with other local authori�es through the Local Government Benchmarking
Framework (LGBF).  This is detailed in our annual LGBF Report.
The cost of living crisis con�nues to impact the lives of our residents and communi�es as we
strive to find ways to support those who are most vulnerable.  For example, we have been
working towards the extension of free school meals provision to ensure children have access
to healthy and regular meals.  We are addressing inequali�es within our communi�es that can
heighten the impact felt by the cost of living crisis by ensuring our young people have access
to appropriate support such as the MCR mentoring programme and advice services when
seeking further educa�on.  Our School Welfare Rights Officer has successfully supported
families to access £560,509 of financial support during 2023/24, with over £1.6m since the
project began.
We con�nue to build on strong exis�ng rela�onships with our communi�es and partners by
developing online resources that provide informa�on on what support is available for our
residents.  If you are in need of cost of living support please visit www.north-ayrshire.gov.uk
or call 01294 310000.   
In order to address the ongoing climate crisis we have planted 36,366 trees through various
projects and with community partners we con�nue to educate our young people on the
impact of climate change and what they and their communi�es can do to help.  We have
con�nued our extensive recycling and reuse programme with items such as old matresses
and furniture being collected and prepared for poten�al future use.  
Everything we do is achieved in the context of our environment.  Moving forward we will
demonstrate this through our ‘Inclusive Growth Dashboard’ which gives an overview of the
status of North Ayrshire and is currently under review.  Our key contextual indicators are
shown below:
Population of North
Ayrshire:
133,490 (June 2022)
29.2% of our children live
in poverty after housing
costs (2022/23)
28% of our households live
in fuel poverty (2021/22)
70.3% of working age
population are in
employment
(December 2023)
10.4% of people earn less
than the living wage
(2023)
Area wide CO2 emissions
are 682kt CO2 (July 2023)
Employee Headcount
7,690
(March 2024)
Number of Full Time
Equivalent Employees
6,561
(March 2024)
49

Page 50

Our Council Plan Progress Update – Year End 2023-24  Page 3 of 39
Our Priori�es 
Our Vision – A North Ayrshire that is fair for all. 
Our Mission – Working together to improve the
lives of our people in North Ayrshire. 
50

Page 51

Our Council Plan Progress Update – Year End 2023-24  Page 4 of 39
Wellbeing
Key Ac�vi�es
Cost of Living
As part of our budget discussions, our
Council approved £160,000 to fund two
addi�onal Welfare Rights Officers for two
years.  These Welfare Rights Officers will
be based in schools and provide financial
advice and assistance to parents and
carers.  Results from our current School
Welfare Rights Officer show an impact is
being made.  106 referrals to our Money
Maters team have resulted in:
• £560,509 in financial gains for
secondary school parents during
2023/24.  An average of £5,387 per
referral.
• £1,067,328 gained by secondary
school parents since the project
began.
The Child Poverty and Cost of Living Board
were successful in obtaining a grant from
the Scottish Government’s Child Poverty
Practice Accelerator Fund (CPAF). 
£79,181 was awarded to the council to
assist with the development of a
streamlined process for residents to
access support.  The process will route the
person to the appropriate service or team
to gain access to all entitlements and
support(s).  
We met with parents of our young people
accessing free school meals and clothing
grants.  The outcome of the discussions
will inform the redesign process of
accessing these benefits.  This forms part
of our No Wrong Door approach and aims
to get consent from parents to automate
the availability of these essential services
in the future.
In March 2024, Cabinet approved the
extension of our free school meals
programme.  This will provide a healthy
mid-morning snack for all primary school
children and ensure availability of ambient
food on a temporary basis during
2024/25.  This covers the period up to the
next phase of the na�onal expansion of
free school meals to those pupils in P6 and
P7 who are eligible for the Sco�sh Child
Payment (expected in February 2025). 
The Sco�sh Government’s most recent
Programme for Government stated that
na�onal universal expansion would then
follow during 2026.  
This approval also saw the extension of
the Winter Warmer Breakfast ini�a�ve
that provides breakfasts to all secondary
school pupils.  This will be available again
between November 2024 and March
2025.  
To further help with the cost of living
crisis, we will provide a £50 clothing grant
to all eligible three and four year-olds in
Early Years during the 2024/25 School
Year.
Financial Inclusion
Our North Ayrshire Financial Inclusion
Strategy is being implemented and is on
target.  The North Ayrshire Financial
Inclusion Partnership includes
representa�on from financial inclusions
service providers and key stakeholders
such as advice services, 1st
Alliance Community
Bank, fuel poverty
advice services,
employability,
educa�on and
housing services,
51

Page 52

Our Council Plan Progress Update – Year End 2023-24  Page 5 of 39
housing associa�ons, community link
workers, the food bank and the Alcohol
and Drugs Partnership.  It was established
in 2023 with an aim to improve referral
pathways and promo�on of services for
our residents.  
For example, our Debt Advice service
which commenced in summer 2023, has
exceeded its referral target of 245 as at
31st March 2024.  Later this year a review
of our Debt Advice service provision will
be undertaken to inform decision making
for the longer term.
We remain commited to ensuring advice
services are available in communi�es
through GP surgeries, schools, foodbanks
and local housing offices.  We are also
expanding our services within Educa�on
to include primary schools and early years. 
To ensure people get access to the
services they require we have established
referral pathways between our Welfare
Rights and Debt Advice Services and a
range other services such as Housing and
Employability.
A communica�ons plan for our Financial
Inclusion Partnership will be developed
later in 2024.  
Our Community Banking Hub in Kilwinning
has been opera�onal from 4th March
2024 and has been well-received by the
local community, with 199 contacts
including transac�ons from our residents
and local businesses.  Our Banking Hub
provides residents and businesses with
access to cash, banking facili�es and in
person services.  This is vital for those who
rely on face-to-face banking.  A review will
take place in May 2024 regarding
extending the opening hours.
Through the Whole Family Wellbeing
Fund, third sector organisa�ons have been
engaged in the transforma�onal ac�vity
required to support holis�c family
support, shi� focus to early interven�on
and preven�on and work towards the
aspira�ons of The Promise.  More info can
be found in our North Ayrshire Children's
Services Performance Update 2023-24
Tackling Inequali�es
We have con�nued to work with partners,
including the lead organisa�on KA Leisure,
to develop our Wellbeing Alliance as we
work together to ensure everyone is given
an opportunity to enjoy life and cope with
challenges.  A successful pilot working
with young people in the Garnock Valley
area has helped shape thinking around
how the Alliance operates to promote
equality and reduce health inequali�es.  
Our council approved a defini�on for Care
Experienced to be treated as a protected
characteris�c within our Equality and
Children’s Rights Impact Assessments
(ECRIAs).  These new assessments were
used immediately for our council budget
discussions in February to ensure the
poten�al impact of any decisions rela�ng
to our care experienced young people
were considered in full.
We have recruited addi�onal MCR
Pathways Coordinators to ensure mentors
are available for our young people who
may benefit from this extra support.  Our
young people con�nue to rate the
programme highly and reports suggest the
interven�on of an MCR Mentor is having a
posi�ve impact on atainment.  Our young
people have requested
access to their mentor
over the school
holidays and
discussions are
progressing to
52

Page 53

Our Council Plan Progress Update – Year End 2023-24  Page 6 of 39
ensure consistency of this support across
North Ayrshire.  Addi�onal mentor
recruitment campaigns are planned over
the coming months.
Work has commenced on u�lising the
“One Good Adult” role profile.  This profile
focusses on providing kind and reliable
rela�onships with “One Good Adult”
offering support and mentoring to the
young person.  This work began a�er
young people indicated that improved
rela�onships support their learning.
To ensure sustained posi�ve des�na�ons
for our young people leaving school, work
is underway with our partners in Ayrshire
College to iden�fy those who are planning
early entry to further educa�on.  This will
allow more targeted transi�on mee�ngs
to take place and ensure young people
have applied for a course which aligns well
with their needs and aspira�ons.
Our young parents’ group was launched in
January 2024 and has seen 15 young
parents regularly engage in weekly
ac�vi�es.  This group has been developed
by and for young parents under the age of
25 to increase their confidence and
support improvement in the physical,
mental, emo�onal and rela�onal
wellbeing of them and their children.
On 23rd February 2024, at Ardeer
Community Centre, we welcomed 70
young people from across secondary
schools in North Ayrshire to take part in
the first Alcohol and Drug Partnership
(ADP) Young Person’s event.  The event’s
aim was to engage with our young people
and listen to their experience of alcohol
and drugs educa�on and how it can be
improved.  The event was facilitated by
mul�-agency partners and included
speakers with lived experience as well as
ac�ve workshops to develop knowledge
and capture views.
Our New Scots community recently
worked with other crea�ve young people
from across North Ayrshire to produce a
short film.  The film follows the character
Stephen (played by Ukrainian, Oleksandr)
as he makes his way to a university open
day and demonstrates the various issues
that are commonly experienced by New
Scots.  The project was a collabora�on
between North Ayrshire Council, The
Ayrshire Community Trust and Vertex
Visions and was filmed in parts of North
Ayrshire and other loca�ons in Scotland. 
The film was premiered at an event in
January.  You can view the  “Different
Ways” short film together with a behind
the scenes stye short documentary ‘The
Making of Different Ways’.  
The Litle Free Library was launched at
Lochshore Park, with environmental-
themed books for children, young people
and adults to use on site or borrow as part
of the Out and About project in the
Garnock Valley.  As part of this project,
families iden�fied by our Family Care
Workers have also benefited from KA
Leisure memberships being provided and
taking part in events to support them get
ac�ve.  This includes being gi�ed
experience kits which include a range of
items and ac�vity ideas for families to
enjoy both indoors and outdoors.
A pan Ayrshire Bri�sh Sign Language (BSL)
plan is currently being finalised alongside
East and South Ayrshire
Councils, East, South and
North Ayrshire Health
and Social Care
Partnerships, NHS
Ayrshire and Arran
and Ayrshire
53

Page 54

Our Council Plan Progress Update – Year End 2023-24  Page 7 of 39
College.  This plan will ensure that people
whose first or preferred language is BSL
will be fully involved in daily and public
life, as ac�ve, healthy residents and will be
able to make informed choices about
every aspect of their lives.  
Life Long Learning Opportuni�es
The Discovery Award, which is delivered in
Irvine, Kilwinning, Garnock Valley and
Three Towns locali�es as well as with a
New Scots group, has seen almost 60
adults par�cipate in bronze and silver
award ac�vi�es.  The Discovery Award is
aimed at people over 50 years of age, to
help promote an ac�ve and healthy
lifestyle by offering challenges to both
s�mulate and mo�vate.
Our Mul�ply Projects have engaged with
248 adults between January and March. 
These projects provide numeracy support
in the community including a partnership
with Ayrshire College, and University of
Highlands and Islands for Arran residents,
allowing us to provide access to
accredita�on.
Housing
Our council recognises that access to good
quality affordable housing and outdoor
green space is a key asset in addressing
child poverty, and poverty overall and has
a posi�ve and las�ng impact on public
health.  All new build council family homes
being built as part of our Strategic Housing
Investment Plan (SHIP) have study space
and private gardens built into their design.
Despite the affordability challenges being
faced, 136 new homes were delivered by
our council and our partner Registered
Social Landlords (RSLs) during 2023/24. 
Our council delivery included 36 homes at
Harbourside in Irvine; 6 amenity
bungalows at A�on Court in Stevenston;
and 12 amenity flats at the former police
sta�on in Largs.  Riverside completed 31
homes at Tarryholme in Irvine. 
Cunninghame Housing Associa�on
delivered 27 homes at West Byrehill in
Kilwinning and 24 amenity flats in Green
Street, Saltcoats. 
Our council bought five proper�es during
2023/24 and have increased our
programme to purchase 15 proper�es
during 2024/25.  We also acquired 33 new
homes across five locali�es between 1
October 2023 and 31 March 2024 to
support Ukrainian displaced households.
There were no new build comple�ons by
our council or our Registered Social
Landlord (RSL) partners from 1 October
2023 to 31 March 2024. We are con�nuing
to build new homes throughout North
Ayrshire to address current demand for
housing and a summary of new build site
starts and ongoing development projects
for the six months ending 31st March are
noted below:  
Arran
Trust Housing Associa�on acquired two
second-hand market homes on Arran for
RSL rent. Construc�on work con�nues at
Arran Development Trust’s Rowarden site,
which is supported by the Sco�sh
Government’s Rural and Islands Housing
fund, providing 18 homes for private rent.
Garnock Valley
During January 2024 works commenced
on site to deliver seven council homes at
Laburnum Avenue, Beith and a further
seven council homes at
Newhouse Drive in
Kilbirnie. Both
development sites
formed part of our
council’s Estate
54

Page 55

Our Council Plan Progress Update – Year End 2023-24 Page 8 of 39
Based Regenera�on Programme. Low
demand flated accommoda�on was
regenerated and will be replaced with
general needs houses and amenity
bungalows.
Irvine
Works commenced on the site of the
former Stanecastle School in Irvine during
March 2024. The site will deliver 31 units
(29 homes) for council rent.
Kilwinning
There were no new site starts or
comple�ons in Kilwinning from 1 October
2023 to 31 March 2024.
North Coast
The site of the former St Mary’s primary
school in Largs is being redeveloped to
provide 26 new homes for council rent.
Works commenced on site during January
2024.
Three Towns
Works commenced on site at the former
James McFarlane school in Ardrossan
during March 2024. The site will provide
19 homes for council rent. Work con�nues
at Cunninghame Housing Associa�on’s 20
unit Garven Road, Stevenston site. The
works commenced during September
2023 and are an�cipated to complete
during late 2024.
Community Wealth Building
Our refreshed Community Wealth Building
(CWB) Strategy, approved by Cabinet in
February, aims to work towards achieving
a wellbeing economy for North Ayrshire. 
We will progress the delivery of the
ac�ons in the refreshed strategy which
includes commissioning research into
op�ons for delivering a locality-based
approach.
We have a lead role in delivering the
Ayrshire Regional Economic Strategy. 
While all Ayrshire Regional Economic
Strategy themes aim to develop
infrastructure to support business growth,
North Ayrshire Council also has the lead
on the “Support for Enterprise” theme.  
This focusses on crea�ng a region where
businesses can grow and
entrepreneurship and crea�vity can
flourish.  The development of a Regional
Economic Strategy website is underway to
support this theme.  Our Business Support
team has concluded a series of mini
enquiries with local businesses to help
develop the website which will host
informa�on on support available.
We have made an investment of £300,000
in developing our approach to CWB with
our communi�es.  This will allow us to
work with third sector and community
partners to support new and innova�ve
ownership models and income genera�on
ideas that bring money into and keep it
within our communi�es.
Commercial Estate Developments
Our new business pavilion within
Annickbank Innova�on Campus in Irvine is
now complete.  The building is low carbon
and energy efficient with an Energy
Performance Cer�ficate (EPC) ra�ng of A+. 
It is hoped that the pavilion will support
the growth of local businesses.  As part of
our provisional award for the Levelling Up
for Ayrshire: Commercial and Low Carbon
Infrastructure project, we have appointed
a design team to prepare
designs for new
industrial space on the
site.
Phase Two of our
commercial space
55

Page 56

Our Council Plan Progress Update – Year End 2023-24  Page 9 of 39
development on Kyle Road is currently
awai�ng the confirma�on of funding,
following which a tender will be issued.  
Public Spaces
Our Streetscene service is responsible for
ensuring the places we live, work and visit
are well maintained and accessible.  To
support this the service has con�nued the
roll out of street assets such as bins, seats
and wheelchair-accessible picnic benches. 
For example, 25 new seats and benches
have been installed in parts of Eglinton
Country Park.  Our Street Cleanliness
Score has also showed a significant
improvement this year rising from 84.6%
to 89.1%.
Our employees are using digital
technology to streamline the recording
and repor�ng of assets that require
maintenance, allowing a quicker response
which provides a beter experience for our
residents.  We have also begun the
regenera�on of all of our 95 play facili�es.  
We have improved bus stop infrastructure
across North Ayrshire through the
£146,000 capital award under the
Community Bus Fund.  The fund aims to
enable local transport authori�es to
improve local public transport, with a
focus on rural areas of depriva�on where
lower popula�on density means bus
services can be less commercially viable. 
These were delivered alongside the bus
corridor improvements funded under
SPT’s Capital Programme.
We have implemented the Regenera�on
Delivery Plan Ac�on programme for
2023/24.  This has been supported by over
£4m funding under the Place Based
Investment Programme, Cycling Walking
and Safer Routes, Vacant and Derelict
Land Fund and SPT’s Capital Programme.  
We have con�nued work on our
Community Transport study establishing
where community transport is in demand
and types of community transport within
North Ayrshire.  From this, public and
stakeholder consulta�on exercises are
underway to help iden�fy the level of
need for community transport across the
area.  
Next Steps
• We will progress our Single Shared
Assessment approach which enables
consent to be obtained from our
residents which will allow us to
ac�vely assess the support available.  
• We will con�nue to deliver our
Mul�ply Projects providing numeracy
support in the community including
access to accredita�on.  
• We will publish our Bri�sh Sign
Language Plan.
• We will refresh our strategic approach
to tackling poverty through the work
of our Child Poverty and Cost of Living
Board 
• We will develop a Pathfinder project
with the Sco�sh Government which
will focus on a place based, person
centred approach to tackling child
poverty.
• We will con�nue making our play
areas more accessible and inclusive by
extending regenera�on works to 15
addi�onal sites.  
• We will undertake a review of our
Debt Advice service.  
56

Page 57

Council Plan Progress Update – Mid Year 2023-24  Page 10 of 39
Case Study – Welfare Rights Officers
School Welfare Rights Officers provide confiden�al advice and assistance to parents and
carers to enable them to access all benefits they are en�tled to.  They also offer advice when
circumstances change, provide support to challenge any sanc�ons and offer representa�on
at appeals.  Through being based in schools it is hoped any s�gma is lessened and parents
and carers feel more confident in approaching officers for assistance as it is a trusted space.  
Key results from our current School Welfare Rights Officer show an impact is being made. 
From 106 referrals to our Money Maters team:
• £560,509 in financial gains for secondary school parents during 2023/24.  An average
of £5,387 per referral.
• £1,067,328 gained by secondary school parents since the project began.
In addi�on to schools, we partner with the Food Bank and have a Welfare Rights Officer
funded by the Trussell Trust taking referrals from all Food Banks and holding drop-in
surgeries as required.  We also have advisers in GP surgeries, Addic�on Services, Jus�ce
Service and Children and Families Teams and get regular referrals to our services such as
Financial Inclusion.
Next Steps
As at 2023/24 we have one Welfare Rights Officer based in our Secondary schools, with
funding met by the Educa�on Service and the Financial Inclusion Partnership.  In February as
part of the budget discussions, Council agreed to fund £160k for School Welfare Rights
Officers.  
The agreed funding will enable recruitment of an addi�onal two Welfare Rights Officers for
two years, extending the current programme to March 2025.  It is intended that the school
clusters will be placed into three sec�ons with one Welfare Rights Officer in each.  This will
keep the links between Early Years, Primary and Secondary, meaning that if a family has
children of various ages, the family is s�ll supported by the same officer.  
Performance management of the School Welfare Rights Officers emphasises wellbeing as
well as financial improvement.  As a result, case studies will be used to manage performance
in addi�on to quan�ta�ve informa�on.  Baselines will be taken to be able to show
improvement.  
With the addi�onal funding
we aim to replicate this
across our schools.  All three
School Welfare Officers will
be in posi�on a�er the
summer to help support our
families during the 2024/25
academic year.
I just wanted to drop a wee email to say thank you so much for
all the assistance in finding what we were en�tled to...  …The
gain isn't just about finances (which is a wonderful help and a
huge weight off my mind) ….  [I] no longer stress and panic over
trying to cover school holidays, sick days etc.  I am much happier
and less stressed as I'm here fully for all three children now
which has made the kids all feel happier.  
The service you offer is wonderful and I'm very grateful to have
been offered your assistance.
57

Page 58

Our Council Plan Progress Update – Year End 2023-24 Page 11 of 39
Communi�es and
Local Democracy
Key Ac�vi�es
Community Planning Partnership
Our Community and Locality Planning
Conference was held in February 2024 and
was supported by representa�ves from
Sco�sh Government who are leading on
Democracy Maters 2.  Democracy Maters
2 is part of the Local Governance Review
which looks at how power, responsibility
and resources are shared with local
government and different communi�es in
Scotland.  It was the main theme for the
Conference.  Over 60 delegates were in
atendance from partner agencies, third
sector organisa�ons, council services and
community members.  
February also saw the launch of the
Community Directory tool  together with
the new Community Planning website. 
Our Community Directory tool allows
residents to find services, groups and
ac�vi�es for health and wellbeing across
Scotland.  Our new Community Planning
website provides all the important
informa�on about our Community
Planning Partnership including community
empowerment, advice on the Cost of
Living crisis and community engagement. 
The Community Planning X account
(formally called Twiter) con�nues to grow
with over 860 followers and over 7,500
impressions since late 2023.
The first of two planned Community and
Locality Planning training sessions took
place online in March 2024 with 16
par�cipants in atendance including
community members, partner
organisa�ons and internal colleagues.  The
next session is scheduled to take place in
November 2024. 
We con�nue to offer training and
outreach sessions regularly to third sector
and voluntary colleagues through the
Community Engagement Network and
atendance at Community Planning
training.  Links will be further
strengthened through development of the
Par�cipa�on Strategy and new
Community Planning Partnership website
and Community Directory.  We will be
engaging with our Third Sector Interface
colleagues at The Ayrshire Community
Trust and Arran CVS to support and
finalise the new strategy so we can be
certain it meets the needs of our council
and our partners.
We engaged with our Joint Youth Forum
and Youth Council around our Community
Plan (our Local Outcomes Improvement
Plan (LOIP)).  These results will be used to
inform our inclusive approach with young
people throughout the lifespan of the
Community Plan.
Community Grant Funding
Our commitment to Community
Investment Funding has supported three
successful grant applica�ons approved by
Locality Partnerships and Cabinet resul�ng
in a total of £108,086 being awarded to
local community organisa�ons.  Our
Communi�es and Place Fund as part of
our Shared Prosperity Fund Investment
Plan has provided £160,000 of
funding to nine
community projects.
58

Page 59

Our Council Plan Progress Update – Year End 2023-24 Page 12 of 39
Islands 
On Arran, we con�nue to support the
three theme groups that feed into the
Island Plan Delivery Group.  This has
involved taking forward the findings of the
North Ayrshire Island Skills Ini�a�ve to
support and fund an Arran Skills
Coordinator which will support individuals
to remain on Arran.  This is a direct result
of responding to needs iden�fied by
research into island challenges through
lived experience.  
On Cumbrae, we have con�nued to
support the Carbon Neutral Islands
programme which, over the year to March
2024, has advanced key energy projects to
reduce greenhouse gas emissions and
tackle fuel poverty, again demonstrated
through lived experiences.  Over £0.95m
of funding was secured through the
Sco�sh Government’s Islands Programme
to support community led regenera�on
projects at Dyemill Bike Park, Lamlash and
Garrison House, Millport.  
Next Steps
• We will work with our third sector and
other partners to ensure our
Par�cipa�on Strategy meets the needs
of our communi�es.
• We will con�nue to develop our
locality planning model as the central
way for residents to be involved in
local decision-making including
working with communi�es to develop
their six locality ac�on plans for
2024/25.
• We will con�nue to work with
communi�es to co-design and deliver
our par�cipatory budge�ng processes.
• We will develop streamlined ways for
communi�es to find informa�on about
support, including funding available to
them.
• We will con�nue to provide support
for communi�es interested in making
greater use of council assets, including
through the Community Asset Transfer
process, and use feedback to make
processes as easy as possible for our
residents.
59

Page 60

Our Council Plan Progress Update – Mid Year 2023-24 Page 13 of 39
Case Study – Over 50’s Ac�vity Group
Social isola�on within the older community in North Ayrshire increased drama�cally during
the Covid-19 Pandemic and remains a significant challenge.  Our Discovery Group has been
successful in addressing the needs of those aged over 50 years within the Irvine Locality.  
The Irvine Library Ac�vity Group was created to address the social and wellbeing needs of
the over 50’s demographic within the Irvine Locality.  The aims and objec�ves of the Over
50’s Library Ac�vity Group are to:
• Provide peer support and reduce social isola�on in the over 50 age group in the Irvine
Locality.
• Provide par�cipants with the opportunity to try a wide variety of new ac�vi�es, which
will be guided by the needs and interests of the group members.
• To improve the health and wellbeing of par�cipants by providing them with the
opportunity to meet new people, share skills and experiences and try new ac�vi�es.
• Provide a forum for informal informa�on sharing and signpos�ng for par�cipants to
access a variety of opportuni�es within the wider community.
The group was adver�sed throughout the Irvine Locality via social media, local shops/venues
and through posters, leaflets and conversa�ons with regular customers.  Weekly sessions of
the Over 50’s Ac�vity Group are planned and developed in partnership with the par�cipants. 
A vital part of every weekly session is the �me built in for the par�cipants to connect and
build rela�onships through an informal coffee and chat.  Weekly sessions also provide
opportuni�es for par�cipants to try new ac�vi�es, share hobbies and interests, work with
partner agencies and explore opportuni�es in the wider community.
At the beginning of the group participants highlighted the various reasons why individuals
chose to join: 
• ‘To help my mental health and find new friends.’
• ‘To keep active, to meet new people and have fun.’
• ‘I have a lot of health problems and I want to meet new people and get help with my
computer.’
Over the past few months, the group has been involved in a wide variety of activities
including: 
• Tai Chi Taster.
• Police and Trading Standards Talk and Information sharing.
• Board games afternoon.
• Group members sharing hobbies and interests.
• Halloween quiz and activities.
• Murder Mystery afternoon.
• Computer class with Input.
• Calligraphy taster session.
60

Page 61

Our Council Plan Progress Update – Year End 2023-24 Page 14 of 39
Climate Change
Key Ac�vi�es
Energy
The Local Heat and Energy Efficiency
Strategy (LHEES) was approved by Cabinet
on 23rd January 2024 and has been
published alongside the Local Heat and
Energy Efficiency Strategy - Delivery Plan. 
As well as the forthcoming Pan Ayrshire
Energy Masterplan, the crea�on of our
Local Heat and Energy Efficiency Strategy
is an example of work that has been
undertaken to beter understand the
current energy use status and
opportuni�es for ac�on.  A revised
Renewable Energy Strategy in 2024 and
building asset decarbonisa�on model will
provide further opportunities to support
decision making for future actions.
Our Council's solar PV farm developments
have progressed to construction stage. 
Both Nethermains and Shewalton site
clearances have been completed, with
fencing being installed and consideration
given to provision of mammal gates to
support biodiversity on the sites.  We are
developing a battery storage pilot scheme
to maximise the use of existing roof
mounted solar PV on non-domestic
buildings to support local energy
networks.
A feasibility study for wind and solar on
the i3 site in Irvine has been completed
and further works are being undertaken
to understand the options available for
low carbon energy generation schemes
for the site.
Our council continues to support wider
action on climate change beyond our own
estate.  Four community renewable
projects have been awarded funding
through the Community Renewable
Energy Generation Fund, totalling
approximately £130,000.  Additional
awareness raising activity is underway to
increase the uptake of the available
funding.
Our Sustainability Team has delivered 52
climate change and energy lessons to 22
primary schools to date, with 10 schools
visited between January and March 2024. 
The lessons support awareness of action
on climate change and encourage action
within schools through their climate
action plans.  A further 12 schools have
signed up for lessons in the new term. 
We continue to work with Keep Scotland
Beautiful to support free energy resources
for Secondary Schools and are developing
a community carbon literacy training pack
for smaller community groups.
Our Business Development team has
supported 209 businesses to help reduce
their environmental impact.  A large focus
of this work has been through
collaboration and delivery of support
including Net Zero Accelerator
programmes and financial aid to adopt
new technology.
Biodiversity
36,366 trees have been planted to date
across North Ayrshire through various
projects and by community partners.  Our
2030 Woodland: A Tree Plan�ng Strategy
con�nues to be a key driver, with support
being provided to local community groups
and the assessment of suitable plan�ng
sites con�nuing.  A working group has
been established to create a new ‘Tree
Plan�ng Webapp’ – a GIS
system that overlays
various relevant layers
to help iden�fy
poten�al sites for
tree plan�ng.
61

Page 62

Our Council Plan Progress Update – Year End 2023-24  Page 15 of 39
All applica�ons submited to the council's
Woodland Grant Fund (2023/24 season)
were assessed in early 2024 and five local
organisa�ons and groups were successful
in receiving a grant to enable them to
deliver their community tree plan�ng
projects.  A total of 3,344 trees will be
planted during 2024 through the
Woodland Grant Fund.  Ongoing
communica�on with all the groups is in
place to ensure that the projects are
progressing well.  
The four successful applicants from last
year’s Woodland Grant Fund (2022/23
season) submited their evalua�on reports
for their projects for the trees they
planted during 2023.  These reports will
now be reviewed, and the informa�on
provided will be used to improve future
rounds of the Woodland Grant Fund.  The
2024/25 Woodland Grant Fund will be
opened and adver�sed in the autumn. 
The fund will support local tree plan�ng
projects, including the crea�on of
community orchards.  
Our Streetscene team con�nues to work
with the volunteer network and local
schools to promote areas of wildflowers to
support biodiversity in North Ayrshire. 
Funding opportuni�es are being explored
to purchase equipment that will help the
service deliver an improved wildflower
meadow management plan.
Our Bourtreehill Park volunteers cleared
around 225m of paths and removed
approximately.  181m2 of Invasive species
(Rhododendron Pon�cum) to improve
accessibility and enjoyment for residents
in an area that had become inaccessible
due to vegeta�on encroachment.  
Three Junior Rangers sessions took place
in early 2024.  These sessions were
atended by 30 young people and
supported by six young leaders and four
volunteers.  During a session in January, a
trip to Haylie Brae Cairn took place to
assist Archaeology Scotland to maintain
the heritage asset and to contribute
towards the crea�on of a new resource
currently being developed by Forestry and
Land Scotland.  Their efforts were
rewarded with 12 of our young people
receiving a Heritage Hero Award.
Our Pupils at St John Ogilvie’s primary
school have been involved in a
consulta�on to inform the crea�on of a
public learning trail in Bourtreehill that
will focus on Science Technology
Engineering and Mathema�cs (STEM) and
local biodiversity.  Schools are being
supported to use a range of biodiversity
monitoring equipment as part of the
curriculum including wildlife cameras and
sampling equipment such as quadrats,
field iden�fica�on guides, soil moisture
and pH probes.  
The Sco�sh Government Biodiversity
Strategy to 2045 (SBS) states that local
authori�es will deliver a Scotland wide
Nature Network.  In response we are
developing a Nature Network strategy to
support a network that connects nature-
rich sites, restora�on areas and other
environmental projects through a series of
areas of suitable habitat, habitat corridors
and stepping-stones.  The North Ayrshire
Nature Network will help to halt
biodiversity loss by 2030 and achieve
nature posi�vity by 2045.  
Our statutory
Biodiversity Duty
report 2022/23 was
submited to the
Sco�sh
62

Page 63

Our Council Plan Progress Update – Year End 2023-24  Page 16 of 39
Government in January 2024.  It must be
completed once every three years and all
council services and arm’s length bodies
must submit returns to the report.  
A working group has been established
with other councils from across Scotland
to develop the content of an e-learn
module to increase awareness and
understanding of our Biodiversity du�es.  
Our first North Ayrshire Learning for
Sustainability (LfS) Partnership group met
in November.  It aims to provide council
services and local STEM and biodiversity
partners with opportuni�es to connect
and iden�fy projects that can be shared
widely across schools and the community,
or projects that will benefit from
collabora�on.  
Transport 
We have made significant progress on
local travel and ac�ve transport including
the adop�on of our Local Transport and
Ac�ve Travel Strategy.  We have raised
awareness of sustainable transport
choices through our Travel Smart
programme and the Trinity Ac�ve Travel
Hub, our social media and working with
workplaces, organisa�ons and volunteers
to provide ac�ve travel ac�vi�es across
the area.  
We have helped people develop more
posi�ve a�tudes towards sustainable
transport choices by con�nuing with
workplace engagement including crea�on
of travel plans and bike maintenance
classes.  
As part of the Electric Vehicle
Infrastructure Fund (EVIF) pathfinder
project, we are working in partnership
with East Ayrshire and South Ayrshire
Council to seek funding to install an
addi�onal 307 electric vehicle charge
points across Ayrshire, to support a just
transi�on to electric vehicles.
We have con�nued the construc�on of
the Links to Eglinton, Kilwinning Ac�ve
Travel Route.  We have also completed the
construc�on of the B714 links at Sharphill,
Saltcoats Ac�ve Travel Route.  
The North Crescent Coastal Path Phase
One in Ardrossan is now complete. 
Construc�on has commenced on the next
phase of Fairlie Coastal Path and is
programmed for comple�on in summer
2024.  We have also completed
construc�on of the Lover’s Walk, Dalry
Ac�ve Travel Route.  
Reuse and Recycling
Our council's bulky waste reuse partner
Cunninghame Furniture Recycling
Company (CFRC) collected 232 reusable
matresses (4.8 tonnes) from January to
March 2024.  783 (18.8 tonnes) of
matresses were collected in total during
the 2023/24 financial year, as part of the
ini�a�ve to promote opportuni�es for
their reuse.
CFRC also collected and reused 58 tonnes
of household furniture and assisted 497
households during January to March
2024.  A total of 200 tonnes of household
furniture was collected for reuse and
2,015 households were assisted to furnish
their homes in North Ayrshire during the
financial year 2023/24.
Our council con�nues to be one
of the highest performing
for household waste
recycling in Scotland
with a recycling rate
of 55.3% achieved in
2022, making the
63

Page 64

Our Council Plan Progress Update – Year End 2023-24 Page 17 of 39
council the 4th highest performing in
Scotland.  The average recycling rate in
Scotland for 2022 was 43.3%.  The dra�
calcula�ons for the 2023 recycling
performance have been submited to The
Sco�sh Environment Protec�on Agency
(SEPA), which will now be subject to
verifica�on checks prior to publishing later
in 2024.  The es�mated household waste
recycling performance for the calendar
year 2023 has improved to 56.1% (subject
to verifica�on).
SEPA published new guidance at the end
of 2023 regarding the management of
Persistent Organic Pollutants (POPs) in
Waste Upholstered Domestic Seating
(WUDS), which has required changes to be
made to separate the material (for
incineration only) at our council's
Household Waste Recycling Centres
(HWRCs) and from fly tipped waste
uplifted by the Streetscene Service.  Work
is ongoing to review the current bulky
uplift service to align with the new SEPA
guidance.
The Scottish Government published a
draft Circular Economy Bill which is
progressing through parliament and is
expected to become law during 2024. 
Officers are working closely with COSLA,
SOLACE and Scottish Government through
a co-design process to develop the key
policy and actions to be taken forward
within a new Waste Route Map for
Scotland.  The Circular Economy Bill and
the Route Map once finalised will be used
to inform the development of our
council's new Zero Waste Strategy, which
will explore the options for further
improving performance in this area.  
We support volunteering groups through
the ongoing distribu�on of volunteering
packs.  Recently a new online process has
been established for volunteers to request
the upli� of liter picking bags. 
Streetscene in partnership with the
volunteering community, has supported
Keep Scotland Beau�ful's Spring liter
picking campaign through issuing liter
pickers and collec�ng liter picked
materials.  
64

Page 65

Our Council Plan Progress Update – Year End 2023-24  Page 18 of 39
Adapta�on
Our council undertook our second climate
Adaptation Capability Assessment in
February 2024, with a cross-service
workshop.  We u�lised the Public Sector
Adapta�on Capability Framework and
Benchmarking Tool.  The framework has
four capabili�es and four maturity levels
for organisa�ons to track their adapta�on
journey and how they can develop each
capability.  Progress of the five ac�ons
from the first assessment were reviewed. 
The second assessment iden�fied five
ac�ons:
• Establish a formal Adapta�on Working
Group within the Council which will
include key stakeholders.  
• Ensure any adapta�on self-
assessments are captured within
Procurement’s Flexible Framework
annual assessment and Financial
Services annual Audit Scotland report.  
• Launch the Introduc�on to Adapta�on
learning module for employees.  
• Create local climate risk maps from
exis�ng publicly available GIS and
na�onal maps including, coastal
erosion, rainfall, wind and heat in
partnership with our council’s
Analy�cs Team.  
• Develop further the internal
partnership working between the
Sustainability and Flood Teams on
council flooding ini�a�ves and ac�ons.  
Our council has flood protec�on schemes
to reduce the impact of climate change on
our communi�es.  The severity and
frequency of flooding is expected to
increase as a result of climate change. 
Ongoing protec�on schemes include the
Millport Flood Protec�on Scheme, coastal
erosion works on Cumbrae and the
comple�on of the Upper Garnock Valley
Flood Protec�on Scheme with the
65

Page 66

Our Council Plan Progress Update – Year End 2023-24 Page 19 of 39
crea�on of a dam.  Flooding scheme
works have also been completed in
Kilbirnie and Dalry.  
North and South Ayrshire Councils are
replacing the Ayrshire Shoreline
Management Plan with a Coastal
Adapta�on Plan during 2024.  Two scoping
reports have been produced for Irvine Bay
and Stevenston Beach to iden�fy methods
to manage coastal erosion and safeguard
access to the beach.  
Net Zero Ambi�ons
A priority ac�on within the Sustainable
North Ayrshire Strategy is to develop
Community Climate Ac�on Plans for each
locality, building on the Climate Ac�on
Town Stevenston project.  Ini�al
development of this programme by the
Sustainability Team has progressed during
early 2024 with support from our
Connected Communi�es Service and APSE
Energy.  A community focused carbon
literacy module is in development to be
made available to community groups
throughout North Ayrshire by the summer.
We are planning to arrange a second
round of volunteering at Eglinton Park to
support the ongoing biodiversity works. 
This ac�vity was well received by
members of the team last year and has
helped to share the opportuni�es to
volunteer first-hand within our local
communi�es.
Next Steps
• We will revise our Renewable Energy
Strategy and build an asset
decarbonisa�on model.
• We will undertake addi�onal
awareness raising ac�vity to increase
the uptake of the Community
Renewable Energy Genera�on Fund.
• We will increase capacity to support
the ac�ons associated within our
LHEES strategy.
• We will con�nue to work with Keep
Scotland Beau�ful, to support free
energy resources for Secondary
Schools.
• We will implement our Local Transport
and Ac�ve Travel Strategy.
• We will con�nue to deliver our Travel
Smart programme.
• We will con�nue to review the current
bulky upli� service to align with the
new SEPA guidance.
• Our North Ayrshire Learning for
Sustainability (LfS) Partnership will
have its second mee�ng in May.
• We aim to complete the construc�on
of our Fairlie Coastal Path.
• We will develop a community focussed
carbon literacy module that will be
made available to community groups.
66

Page 67

Our Council Plan Progress Update – Year End 2023-24 Page 20 of 39
A Sustainable Council
Key Ac�vi�es
Our Workforce
In March, Audit Scotland commenced our
Best Value Thema�c Audit – ‘Workforce
Innova�on’ on behalf of the Accounts
Commission.  The outcome of this audit is
expected in the autumn.
The outcome of our Best Value Thema�c
Audit – ‘Leadership of the Development of
the Council’s Strategic Priori�es’ was
presented to the Audit and Scru�ny
Commitee in November.  More detail on
these audits can be found in the “Audits,
Inspec�ons and Accredita�ons” sec�on
below.
A Voluntary Early Release (VER)
programme provided an opportunity for
employees to volunteer to leave the
council.  An assessment on the impact on
service delivery and associated costs of
exit were considered and 85 employees
le� the council at the end of March 2024. 
As a result of our VER programme, a
number of service re-designs were
approved.  These will take affect from
April 2024.
Our council is now in its 14th year of
delivering a successful Modern
Appren�ceship programme across our
services.  This supports our
Appren�ceship Charter, confirms our
ongoing commitment to our young people
and provides a key element of our
workforce planning approach.  The
Modern Appren�ceship programme
creates a diverse range of opportuni�es
with ringfenced places for young people
with a disability and / or care experience. 
It u�lises over 20 different frameworks
including Ac�ve Leisure, Business
Administra�on, Civil Engineering,
Hor�culture, Housing, Social Sciences and
youthwork.  There have been many
posi�ve outcomes for our Modern
Appren�ces over the last five years with
over 100 young people progressing into
promoted posts within our council.  Our
programme is also highlighted as an
example of good prac�ce by Educa�on
Scotland who stated in their Community
Learning and Development Progress Visit
Report in October that “…the input from
MAs [Modern Appren�ces] is helping the
service be innova�ve and remain
responsive to learners’ changing needs,
especially for children and young people.”
and as a result is progress worth sharing
more widely.
Our council’s Leadership Academy
provides a series of development
interven�ons to our leaders at all levels of
their career.  During 2023/24, 896
delegates days have been delivered with
506 employees ac�vely engaging in these
development solu�ons to enhance their
skills and knowledge.
1,274 referrals have been made to our
Occupa�onal Health Service to provide
support in rela�on to areas such as health
and fitness, Counselling, Cogni�ve
Behavioural Therapy, Physiotherapy and
health advice.  This is also complimented
with training for managers and online
informa�on.  
Our Livewell programme
which is designed and
led by our workforce
for our workforce,
has hosted
ini�a�ves such as
67

Page 68

Our Council Plan Progress Update – Year End 2023-24 Page 21 of 39
healthy ea�ng, weight management,
mental health, financial wellbeing, health
checks, mindfulness and media�on.  This
has led to 3,487 interac�ons from our
employees across our council.  
Effec�ve use of resources
As part of our ‘No Wrong Door’ approach,
our Transforma�on team has worked with
key stakeholders to create a new
streamlined customer referral process. 
This new process will ensure that
customers only share their informa�on
with us once, before direc�ng them to the
most appropriate service provider.  This
includes both internal council services and
external support services.  It is hoped that
this new process will ensure a dignified
customer journey and allow the relevant
service or partner to act as quickly and
efficiently as possible.
Levelling Up Fund
As part of the Levelling Up Fund, we are
an�cipa�ng further guidance on the
recent £20 million alloca�on for Irvine
under the Long-Term Plan for Towns.  This
will include advice on developing the
Town Board required as part of the fund. 
The Department for Levelling Up, Housing
and Communi�es has advised that the
Area Leads and the UK Government’s
Towns Unit and High Streets Taskforce will
work with our council to develop the Town
Plan and provide ongoing support as the
funding is delivered.
On 20 November 2023 the UK
Government announced that 55 projects
had been provisionally selected to receive
funding from the Levelling Up Fund Round
Three.  This includes £122 million for six
projects in Scotland, including £17.54m
towards the North Ayrshire element of
Levelling Up for Ayrshire: Commercial and
Low Carbon Infrastructure proposal
submited by North and South Ayrshire
Councils.
This project seeks to deliver new energy
efficient commercial property and
associated access, ac�ve travel and
electric vehicle charging infrastructure at
key employment loca�ons across Ayrshire. 
This was comprised of two office pavilions
and two specula�ve flexible industrial
units at three sites in Irvine.  The three
Irvine sites proposed were Annickbank,
Kyle Road and i3.
Digital Renewal
As previously noted in our mid-year
report, North Ayrshire Council, in
partnership with South and East Ayrshire
Councils, submited a regional bid to the
Department for Science, Innova�on, and
Technology's (DSIT) £40 million 5G
Innova�on Regions (5GIR) programme. 
This ini�a�ve is designed to significantly
enhance the deployment of 5G
technology across the region, thereby
boos�ng digital connec�vity.  Ayrshire has
been successfully awarded funding
through this ini�a�ve, marking a major
advancement in our commitment to
improving digital connec�vity and
fostering technological innova�on
throughout the area.  
The funding will support five pivotal
projects alongside ecosystem
development, each tailored to harness
advanced 5G technologies to
meet specific regional
needs and
opportuni�es.
68

Page 69

Our Council Plan Progress Update – Year End 2023-24 Page 22 of 39
The five projects are:
1. Digital Processing Manufacturing
Centre: U�lising advanced
manufacturing technologies to
enhance efficiency and precision.
2. Aerospace Innova�on Hub: Applying
5G solu�ons to transform aerospace
design and manufacturing processes.
3. Small to Medium Enterprise Internet
of Things (SME IoT) Adop�on Project
at Moorfield: Empowering SMEs in
sectors such as food, drink,
manufacturing, and engineering with
IoT technologies for improved data
management.
4. Tourism Events Project: Boos�ng
visitor experiences at local events
through reliable, high-speed 5G
connec�vity.
5. Skills and Immersive Learning Project:
Employing virtual and augmented
reality to improve educa�onal
outcomes and prepare students for
future digital challenges.
Central to Ayrshire's digital strategy, the
Ecosystem Development cross-cu�ng
theme aims to foster a robust network of
innova�on through strategic partnerships. 
Key partners include the University of the
West of Scotland, Ayrshire College, the
Na�onal Manufacturing Ins�tute Scotland
(NMIS), and Scotland 5G Centre, all
collabora�ng to integrate cu�ng-edge
digital solu�ons across regional industries
and educa�onal ins�tu�ons.  
The project aligns with our strategic focus
on innova�on, skills development, and
community engagement as outlined in the
Regional Economic Strategy.
Digital Maturity Assessment Update 
Following the successful funding
acquisi�on, the Digital Connec�vity
Maturity Assessment was conducted to
gauge our current digital infrastructure
and plan future enhancements effec�vely. 
This comprehensive evalua�on, along with
extensive stakeholder engagement,
provided deep insights into our exis�ng
infrastructure, pinpoin�ng areas needing
improvement and iden�fying
69

Page 70

Our Council Plan Progress Update – Year End 2023-24  Page 23 of 39
opportuni�es to leverage both local and
na�onal government investments in
digital connec�vity, as well as private
sector investments in full-fibre broadband.
This assessment has laid a solid
founda�on for North Ayrshire’s
progression towards becoming a digitally
inclusive, economically vibrant and smart-
connected community.  By exploring the
iden�fied challenges and recommended
strategies, we are poised to significantly
enhance digital connec�vity and
readiness, paving the way for a flourishing
future in North Ayrshire.
Robust Governance
Prior to our mee�ng of Council to discuss
the 2024/25 budget, Equali�es and
Children's Rights Impact Assessments
(ECRIAs) screenings or assessments were
completed for all budget proposals.  A
project is due to commence to develop
these further and improve the quality of
updates through training and revision of
the templates.  This is being informed by
na�onal Childrens Rights Impact
Assessments (CRIAs).
To ensure good governance and clear
accountability for delivering the desired
outcomes for service users and
communi�es, we are upda�ng our Code of
Corporate Governance on an annual basis.
Shared Prosperity Fund (SPF)
The second round of our Communi�es
and Place Fund obtained Cabinet approval
in February.  The Fund is now closed with
53 applica�ons under review.  The People
and Skills and Suppor�ng Local Business
Shared Prosperity Fund (SPF) priority
ac�vi�es are ongoing, with UK SPF
(UKSPF) replacing the European Social
Fund (ESF) funding for Employability and
Skills.
The Par�cipatory Budge�ng funding
through UKSPF will take place later in
2024, with a budget of £31,000 available.
Next Steps
• We will con�nue to embed and evolve
our Workforce Planning approach
mee�ngs.
• We will con�nue to support the Audit
Scotland Best Value Thema�c Work.
• We will launch a project to develop
and improve the quality of Children's
Rights Impact Assessments.
• Awards will be made under the
Communi�es and Place Fund.
• The Par�cipatory Budge�ng funding
through UKSPF Communi�es and Place
Fund will take place later in 2024, with
a budget of £31,000 available.
70

Page 71

Our Council Plan Progress Update – Year End 2023-24 Page 24 of 39
Case Study – No Wrong Door
Historically, our services needed to rely on our residents to contact various services
themselves and the services didn’t have visibility of any other teams our residents were
involved in.  
To tackle this our No Wrong Door ini�a�ve aims to ensure our residents can always access
the informa�on and support they need from our council and Community Planning Partners. 
It is strongly supported by the Child Poverty and Cost of Living Board and key to our Council
Plan and Digital Strategy 2023-28.  It ensures people are at the centre of innova�on and no
one is le� behind to prevent digital exclusion.
There are two main elements to our No Wrong Door approach, ‘Corporate Referral’ and
‘Single Shared Assessment”.  
Our new Corporate Referral process is now live.  As a result of the review, our residents only
need to provide their informa�on once and will be directly routed to the services that best
meet their needs.  In addi�on, services are no�fied immediately when a request for support
is submited via the online form on our website.  This form is also used by our Customer
Services team when residents call or visit our offices, ensuring that those without internet
access are not digitally excluded and s�ll receive the same high level of support.
Following the no�fica�on, services contact the resident to complete an assessment of their
needs allowing us to route the referral to the appropriate services or external partners to
provide the best support.  These services or partners then make direct contact with the
resident, reducing cost and the poten�ally overwhelming task for residents to contact
mul�ple services and partners.  
Our emerging Single Shared Assessment approach will inform decision making and provide
residents with assistance more quickly through a whole system approach offering immediate
and longer-term support to li� people out of the cycle of poverty.  This will be achieved by
asking residents at the point of applica�on for their consent to use their details to assess
eligibility for all benefits, grants and support available across our council in one applica�on. 
This ul�mately will create a ‘golden record’ to proac�vely help residents access the support
they are en�tled to.
71

Page 72

Our Council Plan Progress Update – Year End 2023-24 Page 25 of 39
Audits, Inspec�ons and Accredita�ons
Best Value Thema�c Approach – Leadership of the Development of the Council’s
Strategic Priori�es
The results of our Best Value Thema�c Audit on the leadership of the development of the
council’s strategic priori�es was presented to the Audit and Scru�ny Commitee in
November.  The results were very posi�ve, sta�ng our council “con�nued to demonstrate a
strong culture of con�nuous improvement”.  The engagement with our communi�es in
jointly crea�ng our priori�es within our Council Plan 2023-28 was also highlighted.  How we
report to ensure effec�ve scru�ny was posi�vely received.  Further good progress has been
made since our Best Value Assurance Audit in June 2020.
The following recommenda�ons were highlighted within the report with progress reported
directly to our Audit and Scru�ny Commitee.  
Recommendation Agreed Management Action
The council should conclude its website
review and make its improvements as soon as
possible.  This will bring many benefits to
users, including raising more awareness of its
vision and priorities.
The website redesign project is currently
progressing at pace and the aim is to have a
Beta version live by Summer 2024 and the full
version live by Autumn 2024.  To improve the
visibility of the Council Plan and priorities, the
home page will be revised to include reference
to our Council Plan 2023-28.
The council should ensure that all the
performance information published on its
website is up-to-date, performance reports
are as timely as possible and audit and
inspection information is easily accessible and
includes how the council is responding to
recommendations.
The website will be reviewed to remove or
replace out of date information.  Audits and
inspections will be including in six monthly
Council Plan Progress reports (these reports)
published on our website.
The council should update all locality
planning information and corresponding links
as soon as possible.
The Community Planning Partnership (CPP)
website will be reviewed to ensure all locality
planning information and links are up to date.
The CPP website will be refreshed with new
Locality Partnership pages.
The council should consider including more
information on its website about what it is
doing to address climate change and the
progress it is making.
The council’s website will be updated to include
more information on what we are doing to
address climate change and progress we are
making, including publication of a dedicated
public facing climate change webpage.  
Options for a social media page dedicated to
climate change will be investigated.
Source:  Leadership of the development of the council’s strategic priorities.  Best Value
Thematic Work in North Ayrshire Council 2022-23.
72

Page 73

Our Council Plan Progress Update – Year End 2023-24 Page 26 of 39
A further update on progress against these recommenda�ons is due to be presented to the
Audit and Scru�ny Commitee in May 2024.  Audit Scotland is expected to publish a na�onal
report on this specific theme in the summer which will enable benchmarking of approaches
with other local authori�es.
Best Value Thema�c Approach – Workforce Innova�on
In March, Audit Scotland commenced the Best Value Thema�c Audit – Workforce Planning
on behalf of the Accounts Commission.  
This focused on the following areas:
• How effec�vely our council’s workforce plans are integrated with its strategic plans and
priori�es.  
• How effec�vely digital technology has been used to support workforce produc�vity and
improve service quality and outcomes.  
• What innova�ve prac�ce our council is using to develop its future workforce capacity
and skills needs and manage staff reduc�ons in line with its priori�es.
• What progress our council has made with sharing roles or func�ons across its services
and/or with other councils and partners.
• How effec�vely our council is measuring the impact of its workforce planning approach.
Next year Audit Scotland will release a na�onal report on Workforce Innova�on to share
good prac�ce.
The results of the audit will be presented to the Audit and Scru�ny Commitee in the
autumn and any resul�ng ac�ons will be considered.  Developments for Workforce
Innova�on include:
• Con�nua�on of Workforce Planning mee�ngs to further embed and evolve the
approach.
• Con�nue support to Audit Scotland Best Value Thema�c Work between April and June.
• Host Learning Events to increase knowledge in rela�on to the applica�on of policies and
procedures.
• Con�nue to evolve and increase our use of digital interven�ons.  
Internal Audit – Council’s Workforce Planning
January 2024 - An Internal Audit report on Workforce Planning was completed and granted
an assurance level of “Substan�al”.  This was prior to the Audit Scotland Best Value Thema�c
Audit detailed above.  No ac�ons were required as detailed in the report to our Audit and
Scru�ny Commitee.
Cyber Security – Public Services Network
In January 2024, we received no�fica�on from the Sco�sh Government Cabinet Office that
the council’s annual Code of Connec�on applica�on successfully passed assessment.  
The Public Services Network (PSN) was established to allow public service organisa�ons to
share informa�on and services in a secure environment.  Before an organisa�on can connect
to the PSN there is a requirement to pass the PSN compliance process and demonstrate that
73

Page 74

Our Council Plan Progress Update – Year End 2023-24 Page 27 of 39
our infrastructure is sufficiently secure.  For the first �me since the PSN was fully established
over 10 years ago this was achieved without the requirement of further clarifica�ons or
remedia�ons being sought.
HMIE – Community Learning and Development
In a recent HMIE report our Community Learning and Development teams have been
recognised as making a significant posi�ve impact on our communi�es in terms of inclusion
and reducing barriers.  
Health and Social Care Partnership 
Our Health and Social Care Partnership (HSCP) performance is reported separately through
the HSCP.  Our HSCP works closely with independent care providers to ensure that the care
and support provided is being delivered in line with peoples’ outcomes, offers best value,
meets regulatory requirements and keeps people healthy and well.  
Care services provided by our partnership teams undergo external inspec�ons and are
subject to rigorous review and inspec�on.  Full details are available within the Health and
Social Care Partnership’s Annual Performance Report.
74

Page 75

Our Council Plan Progress Update – Year End 2023-24 Page 28 of 39
Performance Summary
Measures Adri� of Target
This sec�on details the performance indicators adri� of target and the ac�on being taken to
address performance.  Due to expected data lags the most recent data may relate to
previous �me periods but may only now be available to report.  To avoid duplica�on, only
data that has not previously been reported to our Cabinet is included in this sec�on.
CP_29 Overall carbon emissions (tonnes) (Non-domes�c Council estate)  - Significantly Adri�
of Target
For 2023/24, the total carbon emission figure is 20,745tCO2e.  This is a 0.72% reduc�on
from 2022/23 emissions, and 69.4% reduc�on from our 2005/06 baseline year.  When
calcula�ng our council’s carbon emissions, we consider fossil fuel usage from employee
travel, fleet transport, waste, street ligh�ng, KA Leisure buildings and our non-domes�c
estate (including PPP schools). 
There is an increase in emissions associated with our non-domes�c estate when compared
with the previous year, specifically caused by hea�ng fuels.  We will analyse our proper�es
with excessive energy demand to determine the best approach.
Following increased capacity within the Sustainability Team, energy management prac�ces
will be reinvigorated to scru�nise energy use, ins�l behaviour change and deliver carbon
reduc�on projects.  Behaviour change will be encouraged through an employee energy
awareness campaign which includes u�lising our Leadership Programme, other internal
communica�on channels and a new training module prior to the hea�ng season beginning
in September.  
On Target, 13,
50%
Slightly Adrift of
Target, 2, 8%
Significantly
Adrift of Target,
2, 8%
Data Only /
Status Unknown,
9, 34%
Performance Indicators
On Target
Slightly Adrift of Target
Significantly Adrift of Target
Data Only / Status Unknown
On Target, 45,
98% Slightly Adrift of
Target, 1, 2%
Actions
On Target
Slightly Adrift of Target
Significantly Adrift of Target
75

Page 76

Our Council Plan Progress Update – Year End 2023-24 Page 29 of 39
CP_46 Number of trees planted under the North Ayrshire 2030 Tree Plan�ng Strategy  -
Significantly Adri� of Target
The total number of trees planted at the end of 2023/24 was 36,366, which is slightly lower
than the projected target of 40,000, however the total number of trees planted within the
first three years of the strategy is on track to achieve the overall target of 108,000 trees to
be planted by 2030, with six years of the strategy remaining.  We have made a conscious
decision to defer plan�ng one of our larger key plan�ng sites to allow for the regrading of
soil from another area of the same development site, which will reduce the associated
development costs to the council.  The plan�ng at the site will commence a�er the soil
regrading works are complete.
The level of response from the Woodland Grant Fund applica�ons in 2023/24 was not as
high as expected, so we will be looking to do more publicity around the grant funding this
year to hopefully improve the level of uptake in the next round.  The 2024/25 Woodland
Grant Fund will be opened and widely adver�sed in the autumn, which will support local
tree plan�ng projects including the crea�on of new community orchards.  The Streetscene
Service is also currently reviewing several poten�al plan�ng sites for developing new tree
plan�ng proposals for the 2024/25 tree plan�ng season.
CP_43 Number of council assets under community management (cumula�ve)  - Slightly Adri�
of Target
The number of council assets under community management for 2023/24 was 53.  This is
one fewer than the 54 target.  A Community Asset Transfer was due to conclude prior to the
year end, unfortunately external factors caused a delay in the final stages of the process. 
However, this is expected to be resolved by April 2024.   
CP_31 Percentage of total household waste that is recycled (calendar year as per SEPA)
(LGBF)  - Slightly Adri� of Target
This is a provisional figure as the dra� calcula�ons for the 2023 recycling performance have
been submited to SEPA and will now be subjected to verifica�on checks.  As a result, they
may change prior to issuing in September or October 2024.  The es�mated household waste
recycling performance for the calendar year 2023 is es�mated to be 56.1%.  This is under the
57% target but an improvement on last year’s performance (55.3%).
A new Zero Waste Strategy is being developed during 2024 to explore the poten�al
opportuni�es for improving reuse and recycling performance.  
76

Page 77

Our Council Plan Progress Update – Year End 2023-24 Page 30 of 39
Ac�ons Adri� of Target
CP_29 Promo�ng new woodland crea�on and protec�ng our green spaces to provide a
natural resource for carbon sequestra�on  - Slightly Adri� of Target
Our tree plan�ng work contributes to this ac�on and as detailed above (CP_46), we didn’t
meet our tree plan�ng target for 2023/24.  We will look to increase publicity around the
Woodland Grant Fund this year to hopefully improve the level of uptake in the next round. 
The 2024/25 Woodland Grant Fund will be opened and widely adver�sed in the autumn,
which will support local tree plan�ng projects, including the crea�on of new community
orchards.  The Streetscene Service is also currently reviewing several poten�al plan�ng sites
for developing new tree plan�ng proposals for the 2024/25 tree plan�ng season.
Indicator Amendments and Recommenda�ons
CP_06 Average tariff score: All Leavers
Following a refresh of data within the na�onal Insight system, the 2020/21 annual figure has
changed from 912 to 908.5 and the 2021/22 figure has changed from 905.6 to 899.5.  These
changes do not impact on the status of this �me periods.  
CP_38 Average total tariff for Care Experienced Young People
Following a refresh of data within the na�onal Insight system, the 2021/22 annual figure has
changed from 457 to 413.8 and the 2022/23 figure has also changed from 430 to 413.8.  This
change did not impact on the status of these �me periods.  
CP_39 Number of unemployed people progressing into employment (since 1st April)
The Quarter Two figure of 652 has been amended to 215.  A cumula�ve figure combining
the Quarter Four 2022/23 and Quarter One 2023/24 figures was used in error.  This indicator
is cumula�ve from the beginning of each financial year, but not across years.  Appropriate
changes to the indicator descrip�on have been made on the performance management
system to avoid this in future.  
However, to align with na�onal repor�ng it is recommended that this performance indicator
is replaced with the “Number of unemployed people that have progressed to employment
as a result of par�cipa�on in council funded or operated employability ac�vi�es”.  This figure
is calculated for the official SLAED release and gives scope to include job outcomes which,
under the current indicator, are not included un�l the subsidy ends.  
CP_19 Propor�on of opera�onal buildings that are suitable for their current use (LGBF)
The Quarter Two figure of 91.5% was incorrect and has been corrected to 95.1%.  This was
due to a data entry error.  As a result, the status of this indicator has changed to on target
(green).
77

Page 78

Our Council Plan Progress Update – Year End 2023-24 Page 31 of 39
Performance Indicators
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_36 Number of residents
participating in community learning and
development activity including youth
work
17,269 17,804 23,503 18,700 19,500
CP_04 Proportion of children meeting
developmental milestones (LGBF) 82.2% 78.7% 79.5%
Data
Available
April 2025
79% 79%
CP_37 Average total tariff score of
pupils living in SIMD 20% most deprived
areas
724 711 670.2
Data
Available
March
2025
714 720
CP_06 Average tariff score: All Leavers* 908.5 900 899.5 880 847.2
Data
Available
March
2025
908 910
CP_38 Average total tariff for Care
Experienced Young People 448 413.8 413.8
Data
Available
June 2025
465 470
CP_07 Percentage of school leavers
entering positive destinations (LGBF)* 95.2% 96.2% 96% 93.5% 96.5%
Data
Available
April 2025
96.4% 96.8%
CP_39 Number of unemployed people
progressing into employment (since 1st
April)
285 200 524 450 437 475 450 475
PI Status
Significantly Adrift of Target
Slightly Adrift of Target
On Target
Data Not Available
Data Only
78

Page 79

Our Council Plan Progress Update – Year End 2023-24 Page 32 of 39
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_10a Percentage of procurement
spent on local enterprises 21.39% 23.5% 22.93% 24% 26.04% 25% Data
Pending 26% 27%
CP_40 Number of new build housing
units reaching completion (all tenures)
(Actual not cumulative)
562 384 295 396
CP_41 Number of empty homes brought
back into use (Actual) 122 335 120 378 200 300
CP_28 Hectares of vacant & derelict
land in North Ayrshire 1,204 1,194 1,198 1,144 1,130.43 1,094 951.51 1,094 925
CP_27 Street Cleanliness Index –
Percentage Clean (LGBF) 91.34% 94% 86.7% 94% 84.6% 90  89.1%** 87% 87%
CP_20 Overall percentage of road
network that should be considered for
maintenance treatment
37.1% 38.1% 33.9% 37.5% 34.8% 33.8% 32.5% 34.8% 32.5%
CP_42 Provided floor space of
commercial/industrial space within our
Council portfolio (sq ft)
400,991 404,897 404,755 423,077
CP_02 Percentage of Council budget
directed via participatory methods 1.13% 1.2% 2.32% 1.1% 2.74% 1% 2.05% 1.5% 1.5%
CP_43 Number of Council assets under
community management (cumulative) 49 53 54 56
CP_30 Total installed capacity of low
carbon heat and electricity generation
across the Council's estate
10,720 9,800 11,680 11,000 12,104 11,800 15,992 12,000 28,499
CP_29 Overall carbon emissions
(tonnes) (Non-domestic Council estate) 22,846 35,127 21,791 21,247 20,896 21,000 20,745 19,500 19,953
79

Page 80

Our Council Plan Progress Update – Year End 2023-24 Page 33 of 39
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
2023/24
Value
2023/24
Target
2023/24
Status
2024/25
Target
CP_44 Percentage of council dwellings
that are energy efficient (LGBF)* 97.6% 97.7% Data
Pending
Data
Pending 98.1% 98.5%
CP_45 Length of new or improved active
travel routes per annum (Metres) 1,090 3,900 2,000 2,000
CP_46 Number of trees planted under
the North Ayrshire 2030 Tree Planting
Strategy
35,627 36,366 40,000 47,000
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)
91.05% 93% 91.1% 93% 95.1% 93%
Data
Available
Oct 2024
92.1% 93%
CP_31 Percentage of total household
waste that is recycled (calendar year as
per SEPA) (LGBF)
52.1% 52.1% 56.3% 53.1% 55.3% 56.9% 56.1%**
* 57% 56%
CP_25 Percentage of Council dwellings
that meet the Scottish Housing Quality
Standard (LGBF)
98.83% 99.5% 49.3% 99.5% 63.2%
Data
Available
Oct 2024
72.5% 97.4%
CP_47 Gross rent arrears (all tenants) as
at 31 March each year as a percentage
of rent due for the reporting year (LGBF)
5.5% 6.6% 7.1% 5.88%** 6.5% TBC
CP_48 Percentage of income due from
Council Tax received by the end of the
year (LGBF)
92.1% 93.3% 94.7%
Data
Available
Oct 2024
94% 98%
*No target provided for 2022/23 as the reporting period was underway when the indicators were approved within the Performance Management Framework
**Annual figure is based on local data.  This figure is subject to change after future data releases.
***This figure is provisional data.
80

Page 81

Our Council Plan Progress Update – Year End 2023-24 Page 34 of 39
Ac�on Tracker
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP01 Ensuring that wellbeing is at the heart of local life and
opportunities, with a focus on tackling inequalities.
CP02 Developing a Community Wealth Building approach to a
wellbeing economy.
CP03 Improving educational attainment and achievement and
closing the attainment gap.
CP04 Improving outcomes for care experienced young people
including implementation of The Promise.
CP05 Developing the Young Workforce and ensuring positive
destinations for school leavers.
CP06 Providing lifelong learning opportunities for individuals
and organisations, including digital literacy.
CP07 Maximising access to and uptake of benefits, entitlements
and financial advice.
CP08
Ensuring that supports are available in communities to
alleviate cost-of-living pressures through community hubs
and networks.
81

Page 82

Our Council Plan Progress Update – Year End 2023-24 Page 35 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP09
Through our housebuilding programme and wider Housing
Investment provide homes for life that meet the needs of
our residents.
CP10
Increase the number of homes in the area through a mix
of private and social developments and bringing empty
buildings back in to use.
CP11
Exploration of models and the development of pilot
schemes to increase access to and use of
public/community transport.
CP12 Ensure our places and spaces where we live, work and
visit are well maintained and accessible.
CP13 Developing infrastructure to support business growth.
CP14 Support KA Leisure’s leadership of North Ayrshire’s Health
and Wellbeing Alliance.
CP15
Through the Health and Social Care Partnership Strategic
Plan we will protect and provide care and support for
those in need.****
CP16
Developing strong relationships with communities and
partners based on trust and shared aspirations using their
experiences to inform service provision.
CP17
Providing support for community organisations in
achieving their goals, including as Community Wealth
Building anchor organisations.
82

Page 83

Our Council Plan Progress Update – Year End 2023-24 Page 36 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP18
Creating a participation and engagement framework
which ensures opportunities and support for all residents
to take part in influencing local democracy and council
and partner strategies.
CP19 Supporting participatory budgeting.
CP20 Supporting community asset transfer and community
owned and operated/managed assets.
CP21 Supporting the Community Planning Partnership and the
Community Plan (LOIP).
CP22 Developing partnerships with the third and voluntary
sector.
CP23
Placemaking, including creation of locality action plans
based on the Community Plan (LOIP) priorities and
support the delivery of Islands Plans.
CP24 Ensuring an inclusive, fair, rights-based and asset-based
approach in our work.
CP25 Accessible public services, both digitally and locally,
ensuring a ‘No Wrong Door’ approach.
CP26 Embedding our net-zero ambition in all democratic
decision-making.
CP27 Reducing the carbon footprint of our estate through
rationalisation utilising a locality-based approach and
83

Page 84

Our Council Plan Progress Update – Year End 2023-24 Page 37 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
taking a fabric first and low carbon energy generation
approach to homes and buildings.
CP28
Improving resilience and reducing carbon by developing
and supporting supply chains where materials and goods
are sourced locally.
CP29
Promoting new woodland creation and protecting our
green spaces to provide a natural resource for carbon
sequestration.
CP30 Supporting local businesses as they meet their climate
change obligations.
CP31
Promoting a circular economy in North Ayrshire to reduce
consumption of raw materials and promote reuse, repair
and recycling, and generating energy from residual waste.
CP32 Developing local low carbon energy generation schemes
and networks.
CP33
Unlocking the potential of community owned energy
generation to bring new income streams into
communities and help them take direct action to combat
climate change.
CP34
Learning for Sustainability, and work with communities to
adopt low carbon behaviour change and encourage
climate-based volunteering activities.
CP35 Improving communities’ preparedness to deal with the
impacts of climate change already locked-in.
84

Page 85

Our Council Plan Progress Update – Year End 2023-24 Page 38 of 39
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP36
Working with communities to adopt low carbon behaviour
change and encourage climate-based volunteering
activities.
CP37 Taking a nature-based approach to protect our habitats
and species.
CP38 Developing and promoting active travel infrastructure.
CP39 Transitioning to low and zero carbon travel.
CP40
Ensuring robust governance arrangements are in place to
fulfil the council’s statutory duties, manage risk and
support delivery of key priorities.
CP41 Using dynamic data and lived experiences to inform
decision-making.
CP42
Working with partners nationally, regionally and locally to
secure investment and target resources towards our
priorities.
CP43
Driving change and transformation, using technology
where appropriate, to deliver efficient and effective
services and support delivery of priorities.
CP44 Maximising financial flexibilities to help support delivery
of priorities.
85

Page 86

Our Council Plan Progress Update – Year End 2023-24 Page 39 of 39
****Delivery of this ac�on is managed through the Health and Social Care Partnership Strategic Plan.
Priority
Ref # Existing Overall Action
2023/24
2023/24
2023/24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP45 Maximising value from the use of our assets.
CP46 Focusing our investment on priorities.
CP47 Effective workforce planning ensuring that we have the
right skills/resources to deliver priorities.
86

Page 87

Our Council Plan Progress Update – Year End 2023-24
Page 40 of 39
We strive to make our repor�ng as accessible as possible.  If you have any
ques�ons or require further informa�on on our council’s performance
please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance
87

Page 88

North Ayrshire Council
Annual Performance Report
2023 to 2024
Appendix 2
88

Page 89

Welcome to our Annual Performance
Report 2023 to 2024
This Annual Performance Report is the first annual report relating to our new Council Plan.  Our
Council Plan 2023 to 2028 was approved by Council in June 2023 following consultation with our
residents.  It is our joint plan, our contract with our communities, Our Council Plan.  
This report provides an at a glance summary of how we’ve supported our residents of North
Ayrshire during 2023 to 2024.  You can find full details in our magazine style Council Plan Progress
Reports published on our website (https://www.north-ayrshire.gov.uk/performance).
We are proud to serve our people of North Ayrshire and would like to say thank you to everyone
who has supported the delivery of our services including our communities, third sector, public and
private partnerships and of course our employees. 
Councillor Marie Burns
Leader of the Council
Craig Hatton
Chief Executive
Our Vision – A North Ayrshire that is fair for all.
Our Mission – Working together to improve the lives of our people in
North Ayrshire.
Our four Council Plan priorities are interlinked and interdependent.  They are:
89

Page 90

2023 to 2024 About Us 
Elected Members 
• 12 Scottish National Party (SNP) 
• 10 Scottish Conservative and Unionist 
• 6 Scottish Labour Party
• 3 Labour and Co-operative Party
• 2 Independent 
Employees 
• 7,690 employees
• 6,561 full time equivalent (FTE) employees
• 1,129 part-time employees
• 75.5% female 
• 24.5% male 
Key Facts
• Population:  133,490
• Life Expectancy:
o Female:  79.7 years
o Male:  74.4 years
• 19,617 children and young people attend our
schools and early years centres (including
partner early years centres). 
• 29.2% of children in North Ayrshire live in
poverty (after housing costs)
• 70.3%% of residents are in employment.
• 40.9% of our residents live in the most
deprived Scottish Index of Multiple
Deprivation areas.
Key assets include: 
• 42 Local Authority Early Years Provisions
• 14 Partner Early Years Provisions
• 48 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School 
• 1 Through School (Early Learning Centre,
Primary and Secondary School combined) 
• 13,163 council homes
• 1,118 km carriageway 
• 3,900mm footpaths
• Approx.  23,750 streetlights
• 16 beaches (including three Sites of Special
Scientific Interest (SSSI)
• More than 275 Hectares of woodland
• 15,992kW Total installed capacity of low
carbon heat and electricity generation across
our council’s estate 
90

Page 91

Financial Overview 
Chief Executive's
Service, £22.365 ,
5%
Communities
and Education,
£182.795 , 43%
Place, £59.961 ,
14%
Health and
Social Care
Partnership,
£124.933 , 30%
Other Corporate
Items, £11.681 , 3%
Financing Costs,
£20.360 , 5%
Allocation (£000's)
Chief Executive's Service Communities and Education
Place Health and Social Care Partnership
Other Corporate Items Financing Costs
Scottish
Government
General Grant,
£294.729, 70%
Scottish
Government
Specific Grant,
£19.673, 5%
Non Domestic
Rates, £42.175,
10%
Council Tax,
£65.518, 15%
Funding (£000's)
91

Page 92

Our Performance
This section highlights key areas we have delivered under each of the four priorities: ‘Wellbeing’,
‘Communities and Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’.  Full details can be
found in our six monthly Council Plan Progress Reports on our website www.north-ayrshire.gov.uk. 
Wellbeing
• We established a Financial Inclusion Partnership to increase access to financial advice and
support for our residents.
• We are funding two additional School Welfare Rights Officers providing financial
advice and assistance to parents and carers.
• We agreed to provide a £50 clothing grant to all eligible three and four
year olds in Early Years during the 2024/25 school year to help with the
cost of living.
• We were awarded £79,181 to proactively support residents in
accessing the support they are eligible for following a successful
grant application to the Scottish Government Child Poverty
Practice Accelerator Fund (CPAF).
• Cabinet approved the extension of our free school meals
programme.  This will provide a healthy mid-morning snack for
all primary school children and availability of ambient food
during 2024/25.
• The Winter Warmer Breakfast initiative has been extended
providing breakfasts to Secondary School pupils from November
2024 to March 2025.
• All eight mainland Secondary Schools now have access to mentoring
services following the successful recruitment of MCR Pathway Co-
ordinators with discussions in progress to deliver the service to Arran
High School.
• Our council approved a definition to enable care experienced to be treated
as a protected characteristic within our Equality and Children’s Rights Impact
Assessments (ECRIAs).
• Our young parents’ group was launched in January 2024 with 15 young parents under the
age of 25 regularly engaging in weekly activities to increase their confidence and support improvement
in their and their children’s physical, mental, emotional and relational wellbeing.
• Our refreshed Community Wealth Building Strategy was approved by Cabinet in February and aims to
work towards achieving a wellbeing economy for North Ayrshire.
• 378 empty homes have been brought back into use during 2023/24.  
• 384 new building housing units are reaching completion.  
92

Page 93

Communities and Local Democracy
• 2.05% of Council budget is directed via participatory budgeting methods,
higher than our target of 1.5% and national target of 1%.
• Our Community Investment Fund has approved funding for 13
applications over the year, totalling £721,912.
• We relaunched our Housing Services’ Customer Participation Strategy
for 2023 – 2028. This will ensure that our communities are involved in
decision making and are empowered to influence how we deliver our
Housing Service.
• We successfully launched the Community Directory tool  together with
the new Community Planning website.
• To date, 53 council assets have been transferred to community
management.
Climate Change
• Our Local Heat and Energy Efficiency Strategy (LHEES) and accompanying Local Heat
and Energy Efficiency Strategy - Delivery Plan were approved by Cabinet on 23rd January
2024.
• We launched a £350k Community Net Zero Carbon Fund, enabling local community groups to bid for
funding to help with feasibility and / or renewable energy technologies on land or buildings they own.
• Our council's solar PV farm developments have progressed to construction stage.  Both Nethermains
and Shewalton site clearances have been completed, with fencing being installed and consideration
being given to provision of mammal gates to support biodiversity on the sites.
• A feasibility study for wind and solar on the i3 site in Irvine has been completed and further works are
being undertaken to understand the options available for low carbon energy generation schemes for
the site.
• Our council continues to support wider action on climate change.  Four community
renewable projects have been awarded funding through the Community
Renewable Energy Generation Fund, totalling approx. £130,000.
• 2,015 households were assisted to furnish their homes in North
Ayrshire due to our bulky waste reuse partner Cunninghame
Furniture Recycling Company (CFRC) collecting and processing
reusable items such as mattresses and furniture.
• 36,366 trees have been planted to date across North
Ayrshire through various projects and by community
partners.
• 209 businesses were supported to reduce their
environmental impact.
93

Page 94

A Sustainable Council
• Our Council Plan 2023-28 was approved by Council in June 2023.
Developed with our communities, our Council Plan is our
contract with our residents.
• Our first Best Value Thematic Audit on ‘Leadership of the
Development of the Council’s Strategic Priorities’ results
showed our council “continued to demonstrate a strong
culture of continuous improvement”.  Engagement with
our communities in jointly creating our Council Plan
2023-28 was also highlighted.
• As part of our ‘No Wrong Door’ approach, we have
created a new streamlined customer referral process.
This new process will ensure that customers only share
their information with us once and are directed to the
most appropriate service provider (internal council
services and external support services).
• Our council secured an award of £242,000 from the UK
Government's Department for Science, Innovation and
Technology (DSIT) to advance wireless infrastructure and 5G
technology. We were one of six successful local authorities and the
only one in Scotland.
• Council approved a balance budget for 2024/25.
Areas of Focus
Areas of focus for the next six months are included in our six monthly Council Plan Progress Reports on our
website www.north-ayrshire.gov.uk.
How do we compare?
You can discover how our performance
compares to other Scottish local authorities
through the national Local Government
Benchmarking Framework online tool or
through our LGBF Report published within our
Year End reporting on our website www.north-
ayrshire.gov.uk.
94

Page 95

We strive to make our reporting as accessible as possible.  If you
have any questions or require further information on our
council’s performance please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance
95

Page 96

Local Government
Benchmarking Framework
Analysis of April 2024
Data Release
Appendix 3
96

Page 97

Contents
Introduc�on ............................................................................................................................... 1
Our Approach ............................................................................................................................. 1
Analysis ...................................................................................................................................... 3
Family Groups ......................................................................................................................... 4
People Services ................................................................................................................... 5
Proportion of children living in poverty (after housing costs) ....................................... 5
Gross rent arrears (all tenants) as a percentage of rent due for the year .................... 6
Proportion of children meeting developmental milestones ......................................... 7
Proportion of pupils entering positive destinations ...................................................... 7
Proportion of council dwellings meeting the Scottish Housing Quality Standards ....... 8
Proportion of council dwellings that are energy efficient ............................................. 9
Other Services ................................................................................................................... 10
CO2 emissions area wide per capita (tonnes) ............................................................. 10
CO2 emissions area wide emissions within scope of local authority per capita
(tonnes) ........................................................................................................................ 11
CO2 emissions from Transport per capita ................................................................... 12
CO2 emissions from electricity per capita ................................................................... 13
CO2 emissions from Natural Gas per capita ................................................................ 13
Claimant count as a percentage of working age population ....................................... 14
Claimant count as a percentage of populations aged 16 to 24 years ......................... 14
Proportion of people earning less than the living wage .............................................. 15
Percentage of unemployed people assisted into work from Council programmes .... 16
Gross Value Added (GVA) per capita ........................................................................... 16
Immediately available employment land as a percentage of total land allocated for
employment purposes ................................................................................................. 17
Proportion of procurement spent on local enterprises .............................................. 17
Number of business gateway start-ups per 10,000 population .................................. 18
Town Vacancy Rates .................................................................................................... 19
Percentage of roads that should be considered for maintenance treatment ............ 20
Street Cleanliness Score ............................................................................................... 21
Proportion of total household waste arising that is recycled ..................................... 22
Proportion of the highest paid 5% of employees who are women ............................. 23
Gender Pay Gap ........................................................................................................... 23
Percentage of income due from Council Tax received by the end of year ................. 24
Percentage of invoices sampled that were paid within 30 days ................................. 24
Percentage of Scottish Welfare Fund Crisis Grant decisions made within one day .... 25
Percentage of Scottish Welfare Community Care Grant decisions made within 15
days .............................................................................................................................. 26
Percentage of operational buildings suitable for their current use ............................ 26
97

Page 98

Local Government Benchmarking Framework – April 2024 Analysis Page 1 of 26
Introduction
The Local Government Benchmarking Framework (LGBF) provides an opportunity to
benchmark our performance with other local authorities in Scotland.  It is administered by
the Improvement Service in partnership with the Society of Local Authority Chief Executives
(SOLACE) and highlighted within the Accounts Commission’s Statutory Performance
Information Direction 2021 which defines how local authorities should demonstrate they are
achieving Best Value for the people they serve.  As a result, several of the indicators are used
within our current 2023-28 Council Plan.  This report details our performance as at the data
released in April 2024, most of which relates to 2022/23.  
The LGBF brings together a range of 108 performance indicators covering nine key themes:
• Adult Social Care
• Children’s Services
• Corporate Services
• Culture and Leisure
• Economic Development
• Environmental Services
• Financial Sustainability
• Housing
• Tackling Climate Change
These can be explored in full using the LGBF Dashboard.
Our Approach
The Direction 2021 Statutory Performance Indicator 1 includes a requirement for our council
to report information that demonstrates how we are improving local services and local
outcomes.  This particularly relates to using the LGBF to enable comparison with similar
bodies and over time, linked to the desired outcomes agreed with our partners and
communities.  As such, the Direction 2021 gives scope to identify the key LGBF measures that
relate directly to our Council Plan priorities to help inform decision making.  Our Council Plan
2023-28 priorities are:
98

Page 99

Local Government Benchmarking Framework – April 2024 Analysis Page 2 of 26
The following LGBF PIs have been identified by the Corporate Policy and Performance Team
as relating directly to our Council Plan priorities.  This list is wider than the range of LGBF PIs
directly included in our Performance Management Framework (PMF) as they serve a slightly
different purpose.  The PMF function is to manage performance on a six-monthly basis using
frequent and immediate data.  The LGBF suite provides as close to a like for like comparison
as possible so is used to benchmark our performance and learn from others.
LGBF
Indicator
Group
PI Code Description Use
Children’s
Services CHN11 Percentage of pupils entering positive
destinations PMF
Children’s
Services CHN17 Percentage of children meeting developmental
milestones PMF
Children’s
Services CHN24 Percentage of children living in poverty (after
housing costs) PMF
Tackling
Climate
Change
CLIM1 CO2 emissions area wide per capita PMF
Tackling
Climate
Change
CLIM2 CO2 emissions area wide: emissions within
scope of LA per capita Benchmarking
Tackling
Climate
Change
CLIM3 CO2 emissions from Transport per capita Benchmarking
Tackling
Climate
Change
CLIM4 CO2 emissions from electricity per capita Benchmarking
Tackling
Climate
Change
CLIM5 CO2 emissions from Natural Gas per capita Benchmarking
Economic
Development ECON1
Percentage of unemployed people assisted into
work from council operated / funded
employability programmes
Benchmarking
Economic
Development ECON10
Immediately available employment land as a
percentage of total land allocated for
employment purposes in the local development
plan
Benchmarking
Economic
Development ECON11 Gross Value Added (GVA) per capita Benchmarking
Economic
Development ECON12a Claimant Count as a percentage of Working Age
Population Benchmarking
Economic
Development ECON12b Claimant Count as a percentage of population
aged between 16 and 24 years Benchmarking
Economic
Development ECON4 Percentage of procurement spend spent on
local enterprises Benchmarking
Economic
Development ECON5 Number of business gateway start-ups per
10,000 population Benchmarking
99

Page 100

Local Government Benchmarking Framework – April 2024 Analysis Page 3 of 26
LGBF
Indicator
Group
PI Code Description Use
Economic
Development ECON7 Proportion of people earning less than the real
living wage PMF
Economic
Development ECON9 Town Vacancy Rates Benchmarking
Environmental
Services ENV3c Street Cleanliness Score PMF
Environmental
Services ENV4b Percentage of A class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4c Percentage of B class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4d Percentage of C class roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV4e Percentage of unclassified roads that should be
considered for maintenance treatment Benchmarking
Environmental
Services ENV6 Percentage of total household waste arising
that is recycled PMF
Housing
Services HSN1b
Gross rent arrears (all tenants) as at 31 March
each year as a percentage of rent due for the
reporting year
PMF
Housing
Services HSN3 Percentage of council dwellings meeting
Scottish Housing Standards PMF
Housing
Services HSN5a Percentage of council dwellings that are energy
efficient PMF
Corporate
Services CORP 3b Percentage of the highest paid 5% of
employees who are women Benchmarking
Corporate
Services CORP 3c The gender pay gap (%) Benchmarking
Corporate
Services CORP 7 Percentage of income due from council tax
received by the end of the year PMF
Corporate
Services CORP 8 Percentage of invoices sampled that were paid
within 30 days Benchmarking
Corporate
Services CORP 9 Percentage of Scottish Welfare Fund Crisis
Grant decisions within one day Benchmarking
Corporate
Services CORP 10 Percentage of Scottish Welfare Fund
Community Care Grant decisions in 15 days Benchmarking
Corporate
Asset
CORP-
ASSET1
Percentage of operational buildings that are
suitable for their current use PMF
Analysis
Of the 33 LGBF PIs directly linked to our Council Plan 2023-2028 priorities, 25 have data for
2022/23.  It should be noted this April 2024 data release relates to a time period prior to the
current Council Plan, however the plan builds on progress made during the previous Council
Plan to drive immediate and longer-term sustainable improvements for our residents.  As a
result, the analysis of these PIs is still valid for this time period.
100

Page 101

Local Government Benchmarking Framework – April 2024 Analysis Page 4 of 26
During 2022/23 eight priority PIs were within the top quartile (32%) and six were within the
second quartile (24%).  Top quartile performance includes areas such as crisis grant
payments, proportion of pupils entering positive destinations, household waste recycling
and rent arrears.
Of the indicators with data 68% of our priority indicators demonstrate improved
performance in the short term (one year comparison of 25 PIs with data) and 4% remain
unchanged.  For the same number of PIs over the medium term (three years), 60% have
improved and 4% remain unchanged.  Long term (10 years) 93.75% of indicators have
improved (based on 16 PIs with comparable data).
Rank is naturally affected by other local authority performance and though useful as an
indication of relative performance, it cannot be viewed in isolation.  Over the short term, of
the 25 PIs with data, 52% have improved rank and 12 % have maintained their position.  For
the same number of PIs over the medium term, 64% have improved and 4% have
maintained their position.  Over the long term, where data is available for 16 of the PIs,
62.5% have improved and 6.25% have maintained their position.
Family Groups
Family groups enable local authorities to make as close to a like for like comparison as possible
with other councils by grouping those within similar traits depending on the indicator. 
Grouping is based on levels of deprivation (people services) or rurality (other services). 
Following a review in 2022/23 of previous LGBF reporting 2022/23, a more visual chart-based
approach and analysis focussing on family groups was adopted.  This more in-depth
consideration of each indicator is made possible by focussing on the indicators directly linking
to our priorities.
We will be using this information to actively benchmark through approaching other local
authorities to learn from their performance and/or gain context to their results.  In addition,
the Improvement Service is exploring the potential of a peer review system to support this
approach in future.
In the following charts, North Ayrshire Council’s performance is indicated by a thick dark blue
line.  For ease of viewing, only the data labels relating to North Ayrshire Council are included
in the graphs.  To support accessibility, a summary analysis is provided for each chart.  
Full details, including the meta data behind each measure which explains how it is captured,
is available through the LGBF Dashboard.
101

Page 102

Local Government Benchmarking Framework – April 2024 Analysis Page 5 of 26
People Services
This section provides an overview of North Ayrshire’s performance within our ‘People
Services’ Family Group.  This includes our priority indicators relating to Children, Social Work
and Housing.  Local authorities included in this comparison are:
• North Ayrshire Council
• Comhairle nan Eilean Siar 
• Dundee City Council 
• East Ayrshire Council 
• North Lanarkshire Council 
• Inverclyde Council 
• West Dunbartonshire Council 
• Glasgow City Council 
Proportion of children living in poverty (after housing costs) 
(Please note, the axis of this chart is 15% to 35% for clarity.)
Most recent child poverty statistics were released by Loughborough University and End Child
Poverty in June 2024 and are not covered in the LGBF data release (in the chart above).  The
June data states 29.2% of children are in poverty after housing costs (as at 2022/23) which is
0.2 percentage points higher than in 2021/22 and we remain second highest behind Glasgow
City Council (32.9%).  
The LGBF data release in the chart above relates to 2021/22 and shows an increase from
24.7% to 28.9% of children living in poverty.  However, due to changes in the methodology in
gathering this information during the Covid-19 pandemic, 2020/21 isn’t directly comparable
to other years.  
29.2% (2022/23) means approximately 7,181 of our children, young people and their families
may be struggling every day to access essentials such as food, sanitary products, clothing and
transport.  
102

Page 103

Local Government Benchmarking Framework – April 2024 Analysis Page 6 of 26
Our Child Poverty and Cost of Living Board Chaired by the Leader of our council implements
our Child Poverty Strategy 2023-26.  The Board continues to coordinate whole systems
approaches where possible across our council, Health and Social Care Partnership, NHS
Ayrshire and Arran, third sector partners and our communities.  
Gross rent arrears (all tenants) as a percentage of rent due for the year
(Please note the axis for this chart is 0% - 10% for clarity)
The percentage of rent due for the year has increased from 6.63% in 2021-22 to 7.14% in
2022-23.  This is lower than other family group members, however the increasing trend has
continued since 2018-2019 and may be related to the cost-of-living crisis.  Only North
Lanarkshire is seeing a decrease in rent arrears during 2022-23.  Cost of living support is
available on our website (www.north-ayrshire.gov.uk) and is being supported across our
partners, led by our Child Poverty and Cost of Living Board.
103

Page 104

Local Government Benchmarking Framework – April 2024 Analysis Page 7 of 26
Proportion of children meeting developmental milestones
(Please note the axis for this chart is 70% - 90% for clarity)
This indicator relates to the proportion of children meeting developmental milestones as
reported by our Health and Social Care Partnership.  Along with East Ayrshire, Inverclyde and
North Lanarkshire within the family group, our performance has improved slightly from 2021-
22 moving from 78.73% to 79.53%.  Our Health and Social Care Partnership has lead
responsibility for Child Health services (including child immunisation and infant feeding). 
Details of the work undertaken by our Health and Social Care Partnership around child health
can be found in the North Ayrshire Health and Social Partnership's Annual Performance
Report 2022-2023.  
Proportion of pupils entering positive destinations
(Please note the axis for this chart is 90% - 100% for clarity)
104

Page 105

Local Government Benchmarking Framework – April 2024 Analysis Page 8 of 26
Data is sourced from Scottish Government School Leaver Attainment and Initial Destinations
information.  Though data is included for 11 years, the source data notes state due to changes
in the curriculum, trends over time may not be comparable.  
As detailed within our Education Service Improvement Plan we are designing tailored
programmes with partners to provide enhanced support for specific groups of school leavers,
including our young people with additional needs.  This will improve opportunities for
targeted learners to achieve and maintain an appropriate positive post-school destination.  
Proportion of council dwellings meeting the Scottish Housing Quality Standards
The energy efficient elements of the Scottish Housing Quality Standards were replaced by the
Energy Efficiency Standard for Social Housing (EESSH) that had to be met by landlords by 2020. 
The change in regulations reduced the testing period for electrical testing from every 10 years
to every five years and impacted on the reportable Scottish Housing Quality Standard (SHQS)
figures in 2021/22.  
Prior to this change we were reporting an SHQS figure of 97.36% in reporting year 2020/21. 
This reduced to 49.3% in 2021/22 due to the number of properties which immediately fell
outside the five-year testing period as a result of the targets when introduced.  An action plan
was developed and we have implemented several measures to meet the new targets to
ensure we progress towards 100% compliance in this area.  Our own performance is
improving at a faster rate than the national average, from 49.28% in 2021/22 to 63.24% in
2022/23 compared to the Scottish average of 68.5% and 70.9% respectively so progress is
being made in this area.
105

Page 106

Local Government Benchmarking Framework – April 2024 Analysis Page 9 of 26
Proportion of council dwellings that are energy efficient 
(Please note the axis for this chart is 60% - 100% for clarity) 
The proportion of council dwellings that are energy efficient remains high, with performance
improving slightly from 97.58% in 2020-21 to 97.66% in 2021-22.  This is the best performance
in our family group and higher than the Scottish average of 87.6%.    
106

Page 107

Local Government Benchmarking Framework – April 2024 Analysis Page 10 of 26
Other Services
This section provides an overview of North Ayrshire’s performance within our ‘Other Services’
Family Group.  This includes indicators relating to Corporate Services, Culture and Leisure,
Economic Development, Environmental Services, Financial Sustainability and Tackling Climate
Change.  Local authorities included in this comparison are:
• North Ayrshire Council
• Perth and Kinross Council 
• S�rling Council 
• Moray Council 
• South Ayrshire Council 
• East Ayrshire Council 
• East Lothian Council 
• Fife Council 
CO2 emissions area wide per capita (tonnes) 
This measure looks at the CO2 emissions that are area-wide, not only in the scope of North
Ayrshire Council.  It is a contextual indicator that helps inform our approaches, however we
seek to lead where possible.  Tackling Climate Change a priority for our Council, with the aim
to become net zero by 2030.  
Four community renewable projects have been awarded funding through the Community
Renewable Energy Generation Fund, totalling approximately £130,000.  Additional awareness
raising activity is underway to increase the uptake of the available funding.
Education programmes for our young people in our schools and communities are ongoing. 
Our Sustainability Team has delivered 52 climate change and energy lessons to 22 primary
schools to date, with 10 schools visited between January and March 2024.  The lessons
support awareness of action on climate change and encourage action within schools through
their climate action plans.
107

Page 108

Local Government Benchmarking Framework – April 2024 Analysis Page 11 of 26
We also work with local businesses to support their just transition to net zero.  Our Business
Development team has supported 209 businesses during 2023/24 to help reduce their
environmental impact.  A large focus of this work has been through collaboration and delivery
of support including Net Zero Accelerator programmes and financial aid to adopt new
technology.  
CO2 emissions area wide emissions within scope of local authority per capita (tonnes) 
This measure shows the emissions within the control of North Ayrshire Council.  Over the long
term, all 32 local authorities have reduced their emissions over the past 11 years.  However
there has been an increase in CO2 emissions from 2020/21 to 2021/22 due to the Covid-19
restrictions easing and colder temperatures increasing the use of heating in buildings during
this period.  This is a UK wide trend.  
Locally, our Sustainable North Ayrshire Strategy 2024-27 was approved by Cabinet in
December, building on the significant progress made from the former strategy as listed in the
attached report.   Our Local Heat and Energy Efficiency Strategy and Delivery Plan were
published in January 2024 following approval by Cabinet.  These strategies provide a full
analysis and actions to reduce emissions in North Ayrshire.
Details of the range of activities being undertaken can be found in our Council Plan Year End
Progress Report 2023-24 accompanying this report. 
108

Page 109

Local Government Benchmarking Framework – April 2024 Analysis Page 12 of 26
CO2 emissions from Transport per capita 
This indicator records the annual carbon dioxide emissions from Transport per capita (in
tonnes) in the local authority area.  It should be noted in this release of data (April 2024) due
to the use of inconsistent population estimates National Records Scotland (NRS) have advised
that the mid-2022 estimates should not be compared to years prior to 2021.  NRS are
undertaking work to revise mid-2011 to mid-2021 estimates to ensure comparability between
mid-2022 estimates and previous years.
North Ayrshire currently sits above the national average of 26.81 tonnes.  Only Moray Council
is higher with 35.31 tonnes in our family group.  We remain committed to helping our
residents and businesses transition to active travel with the adoption of our Local Transport
and Active Travel Strategy.  3,900m of active travel routes have been created or improved
during 2023/24.  We are also exploring community transport needs through our Community
Transport study.  
Our council is implementing our Fleet Decarbonisation Strategy to rationalise our fleet,
converting to lower carbon alternatives and avoiding travel where possible.  As at December
2023, we had 31 electric vehicles across our fleet.  We are also encouraging the use of electric
vehicles as we continue to develop the new Ayrshire Electric Vehicle Infrastructure Fund
pathfinder project which aims to bring £5 million public electric vehicle charging investment
into Ayrshire to deliver an additional 307 new electric vehicle chargers.   
109

Page 110

Local Government Benchmarking Framework – April 2024 Analysis Page 13 of 26
CO2 emissions from electricity per capita 
This indicator records the annual carbon dioxide emissions from electricity per capita (in
tonnes) in the local authority area.  As detailed above, there is work ongoing to make the
population figures used for this indicator consistent to support trend analysis.
North Ayrshire currently sits above national average of 46.05 tonnes, recording 48 tonnes,
with only Fife Council higher in our family group with 49.48 tonnes. 
CO2 emissions from Natural Gas per capita 
This indicator records the annual carbon dioxide emissions per capita (in tonnes) in the local
authority area.  As detailed above, there is work ongoing to make the population figures used
for this indicator consistent to support trend analysis.
North Ayrshire currently sits above the national average of 57.22 tonnes.  We currently have
the highest natural gas emissions within our family group.
110

Page 111

Local Government Benchmarking Framework – April 2024 Analysis Page 14 of 26 
Claimant count as a percentage of working age population 
North Ayrshire had the highest claimant count rates as a percentage of working age
population within our family group 2023-24.  From 2020/21 we have seen an improvement
as we emerge from the pandemic.  This decline in claimant counts from 2020/21 can be seen
across the family group although the rate of improvement is beginning to reduce to pre
pandemic levels.  This measure is contextual and wider than the impact our council alone can
influence.  However, our Employability Service continues to support people into work with
475 people supported during 2023/24.  We also work with anchor institutions through our
Community Wealth Building Strategy to improve employment opportunities in North
Ayrshire.  More specific initiatives aimed at the younger workforce are detailed below.
Claimant count as a percentage of populations aged 16 to 24 years 
111

Page 112

Local Government Benchmarking Framework – April 2024 Analysis Page 15 of 26
North Ayrshire had the highest claimant count as a percentage of population aged 16 to 24
years within our family group.  Similar to claimant count rates as a percentage of working age
population, performance has improved since the lock down periods of the Covid-19 pandemic
in 2020/21, however from 2022/23, there has been an increase from 5.33% to 5.59%.  This is
more in line with pre-pandemic figures.  Though this indicator is much wider than our
council’s sphere of influence, work continues on our Modern Apprenticeship and Skills for Life
programmes which support those aged up to 24 years into employment.   
Proportion of people earning less than the living wage 
(Please note the axis for this chart is 0% - 30% for clarity) 
The proportion of people earning less than the living wage is continuing to decrease in North
Ayrshire.  Currently only East Ayrshire Council is performing better within our family group
(9.20%).  At 11.7% for 2021-22, we are performing better than the Scottish average of 14.4%. 
We are currently ranked 5th across all Scottish local authorities in this area.  As detailed above,
the implementation of our Community Wealth Building Strategy is key to working with
partners to improve performance in this area and directly links to addressing child poverty in
North Ayrshire. 
112

Page 113

Local Government Benchmarking Framework – April 2024 Analysis Page 16 of 26
Percentage of unemployed people assisted into work from Council programmes 
(Please note the axis for this chart is 0% - 30% for clarity) 
The percentage of unemployed people assisted into work from our employability
programmes has decreased from 24.13% to 19.41% from 2021-22 to 2022-23.  This measure
can be impacted by how far an individual is from gaining skills required to obtain employment,
as well as the current unemployment rate.  
Gross Value Added (GVA) per capita 
Gross Value Added (GVA) is something we can help influence as a local authority; however, it
relies on all industry within North Ayrshire and is monitored for context.  Currently North
Ayrshire has a GVA of £18,127 which is an improvement from 2021-22 and part of a long-term
positive trend.  This is below the family group average of £20,886 and the national average of
£27,039.
113

Page 114

Local Government Benchmarking Framework – April 2024 Analysis Page 17 of 26
Immediately available employment land as a percentage of total land allocated for
employment purposes 
In North Ayrshire, we have a greater amount of currently available employment land as a
percentage of total allocated employment than other local authorities in our family group
(15.3%) and the Scottish Average (22.8%).  It is important to balance the amount of land
available with demand, by having immediate availability it gives greater opportunities for
inward investment.  We are currently have the 7th highest availability in Scotland.
Proportion of procurement spent on local enterprises 
(Please note the axis for this chart is 0% - 40% for clarity) 
This indicator is a useful comparison for benchmarking purposes; however, it does not
capture all spend as detailed in our 2020/21 Mid-Year Council Plan Progress Report.  “The
LGBF calculation excludes certain spend, most notably it excludes all suppliers spend below
£1,000 and excludes all suppliers not categorised as core trade organisations.  This is
therefore not an accurate reflection of the economic activity within North Ayrshire.  As we
have access to the source data used by the LGBF we are able to capture all spend data and
114

Page 115

Local Government Benchmarking Framework – April 2024 Analysis Page 18 of 26
refine the calculation at a local level to better capture our spend with local enterprises and
shorten the time delay in reporting.”
Performance has improved over recent years, with 24.1% of procurement spend on local
enterprises according to LGBF calculations.  Local calculations show procurement spend is
26.04% as at 2022/23, with 2023/24 results expected in July.
Number of business gateway start-ups per 10,000 population 
The most recent data available as at September 2023 shows the number of business gateway
start-ups per 10,000 population is seven.  Though this is a decrease on the previous year, it is
a trend reflected elsewhere due to economic conditions.  Though business startups are
welcomed, it is the sustainability of these businesses that is important to maintain
employment and support our economy.    
115

Page 116

Local Government Benchmarking Framework – April 2024 Analysis Page 19 of 26
Town Vacancy Rates 
Town vacancy rates have reduced to 7% which is the lowest in our family group and below
the national average of 12%.  This is the first time we have performed below the national
average since 2017/18.  Town vacancy rates are a measure of the performance of our town
centres and cannot be viewed in isolation.  A suitable mix of various retail and service
organisations in our towns is crucial to support ongoing regeneration.
116

Page 117

Local Government Benchmarking Framework – April 2024 Analysis Page 20 of 26
Percentage of roads that should be considered for maintenance treatment
117

Page 118

Local Government Benchmarking Framework – April 2024 Analysis Page 21 of 26
The percentage of roads that should be considered for maintenance treatment is shown in
the four charts on the previous page and reflects the mixture of rural and urban areas in North
Ayrshire.  The requirement for maintenance remained relatively constant over the past there
years.  Please note, these are two-year rolling averages.  Most recent information from our
Council Plan Year End Progress Report 2023-24 shows 32.5% of our road network overall
should be considered for maintenance treatment, slightly lower than previous years and
within the target of 34.8%.  
Street Cleanliness Score 
(Please note the axis for this chart is 60% - 100% for clarity) 
Street cleanliness was impacted by the pandemic as resources were diverted to other services
such as waste collection.  Most recent data available within our Council Plan Year End Progress
Report 2023/24 shows this has improved, with a provisional figure of 89.1%, above our year
end target of 87% as at 2023/24.
118

Page 119

Local Government Benchmarking Framework – April 2024 Analysis Page 22 of 26
Proportion of total household waste arising that is recycled 
(Please note the axis for this chart is 60% - 100% for clarity) 
The draft calculations for the 2023 recycling performance have been submitted to SEPA and
are subject to verification so may change prior to issuing in October 2024.  The estimated
household waste recycling performance for the calendar year 2023 is estimated to be 56.1%,
an improvement on the published 2022/23 figure of 55%.  A new Zero Waste Strategy is being
developed during 2024 to explore the potential opportunities for improving reuse and
recycling performance.
We participate in the Clyde Valley Residual Waste Contract.  Our council and four partnering
councils (East Dunbartonshire, East Renfrewshire, North Lanarkshire and Renfrewshire) are
converting non-recyclable / residual waste into energy.  More details can be found in this
video Turning waste into energy - North Ayrshire Council - YouTube 
119

Page 120

Local Government Benchmarking Framework – April 2024 Analysis Page 23 of 26
Proportion of the highest paid 5% of employees who are women 
(Please note the axis for this chart is 60% - 100% for clarity) 
There is an overall long-term positive trend in this area, increasing from 61.17% to 61.30%
over the last reporting period.  
Gender Pay Gap 
Our Gender Pay Gap has continued its gradual decline from 2018/19 reducing from 2.81% to
1.09%.  Work continues to minimise horizontal and vertical segregation in our workplace.
120

Page 121

Local Government Benchmarking Framework – April 2024 Analysis Page 24 of 26
Percentage of income due from Council Tax received by the end of year 
North Ayrshire Council continues to perform least well within our family group, with Perth
and Kinross Council having the strongest performance with 98.40% of income due from
Council Tax received by the end of year compared to 94.74% for North Ayrshire.  However,
performance has improved since 2021/22 (93.34%).  This represents £61.3 million out of
£64.7 million (excluding relief and rebates) of Council Tax owed in 2022/23.  We are currently
ranked 29th out of the 32 local authorities.  
Percentage of invoices sampled that were paid within 30 days 
121

Page 122

Local Government Benchmarking Framework – April 2024 Analysis Page 25 of 26
North Ayrshire Council has the second strongest performance within our family group with
93.31% invoices sampled paid within 30 days.  The highest performing was South Ayrshire
with 94.45%.  We are currently ranked 11th in Scotland for the speed of our payments.  
Percentage of Scottish Welfare Fund Crisis Grant decisions made within one day 
The most recent data related to the end of September 2023 when 99% of Scottish Welfare
Fund Crisis Grant decisions were made within one day.  This is equal to East Ayrshire, Fife and
Perth and Kinross councils.  This is above the Scottish average of 93.5%.  We are currently 7th
in Scotland.  
During 2022/23, 3,605 crisis grants were paid to our residents.  Work is ongoing through the
Council Plan and Child Poverty Action Plan alongside our partners in the public, private and
third sector to support our residents to obtain more stable financial support through
employment, maximising income and reducing household costs.   
122

Page 123

Local Government Benchmarking Framework – April 2024 Analysis Page 26 of 26
Percentage of Scottish Welfare Community Care Grant decisions made within 15 days 
The most recent data related to the end of September 2023 when 99% of Scottish Welfare
Fund Community Care Grant decisions were made within 15 days.  This is the third highest
within our Family Group behind only East Ayrshire and East Lothian.  This is above the Scottish
average of 86%.  We are currently ranked 10th in Scotland.  
Percentage of operational buildings suitable for their current use 
95.1% of our operational buildings are suitable for their current use.  This is higher than the
family group average of 89.9% and the Scottish average of 86.1%.  Moray Council continues
to perform the strongest in this area likely due to having considerably fewer operational
buildings, 160 as at 2022/23.  Whereas the number of operational buildings in North Ayrshire
is 247. 
123

Page 124

Local Government Benchmarking Framework – April 2024 Analysis Page 27 of 26 
We strive to make our reporting as accessible as possible.  If you have any
questions or require further information on our council’s performance please
contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance 
124

Page 125

NORTH AYRSHIRE COUNCIL  
31 October 2024 
Audit and Scrutiny
Title: Carbon and Scope 3 Emissions
Purpose: To update the Audit and Scrutiny Committee on what is included
in the Council’s carbon emission reporting, and ongoing work to
understand and reduce scope 3 emissions.
Recommendation: It is proposed that the committee note the progress and ongoing
action to reduce carbon emissions in North Ayrshire and expand
on emissions sources reported both internally and externally. 
1. Executive Summary 
1.1 North Ayrshire Council declared a climate emergency in June 2019, setting a net zero
emissions target for 2030.  Carbon emissions have been recorded since the Council’s
first carbon management plan in 2006, and have evolved to include more sources of
emissions.
1.2 Emissions are classed by the Greenhouse Gas Protocol into ‘scopes.’  The Council
reports both internally and externally on these scope emissions, and are considering
methods to increase scope 3 emissions, in line with the Public Bodies Climate Change
Duties Report.
1.3 An update report on the ‘Climate Change Target and Associated Policies’ was
presented to Audit and Scrutiny Committee on 29th August.  Members requested a
further report be presented to detail what was incorporated in carbon emissions (i.e.
Council estate assets including office rationalisation, KA Leisure, Council housing and
fleet operations), and note the wider work which was ongoing across the Council
concerning wider (indirect) emissions, and how best to capture this information in terms
of reporting. 
2. Background 
2.1 In 2018, the Intergovernmental Panel on Climate Change (IPCC) report warned that we
have until 2030 to keep global temperatures from rising more than 1.5°C above pre-
industrial levels before damage to the planet is irreversible.  In response, the Council
declared a Climate Emergency in June 2019 and set an area-wide ambition to achieve
net zero carbon emissions by 2030, in line with the IPCC report.
2.2 Carbon emission reporting has been undertaken by the Council since the first Carbon
Management Plan in 2006, using a 2005/06 baseline year.  As the Council’s strategies
for carbon reduction have evolved, culminating in the most recent Sustainable North
Ayrshire Strategy (2024-27), so too have the emissions calculations to include more
emission sources.  Council emissions are reported internally through the corporate
performance management system, Pentana. 
Agenda Item 6
125

Page 126

2.3 Public bodies have statutory climate change duties under the Climate Change
(Scotland) Act 2009 to cut greenhouse gas emissions, prepare for the impacts of
climate change and to act sustainably.  The Climate Change (Duties of Public Bodies:
Reporting Requirements) (Scotland) Order 2015, requires local authorities to report on
their emissions annually. This is achieved by completing the Sustainable Scotland
Network (SSN) Public Bodies Climate Change Duty (PBCCD) reporting template, for
reporting to the Scottish Government.  Within this template, emissions sources are
categorised within three ‘scopes’ and these emission sources are also mirrored within
the Council’s internal estate emission reporting.
2.4 Scope emissions were established through the Greenhouse Gas Protocol, as a way of
measuring emissions arising from different sources.
• Scope 1 emissions are direct emissions from activities owned or controlled by
the Council for example fuel use for heating and fleet vehicles.
• Scope 2 emissions are indirect emissions from the consumption of purchased
electricity, heat, steam and cooling.
• Scope 3 emissions are all other indirect emissions (not included in scope 2),
arising from the procurement of goods and services from a third party or
contractor, for example business travel in staff cars, waste, water use and
procured goods or services. 
Table 1 below identifies the sources of emissions reported, the fuel used and the scope
in which the arising emissions are classified:
Table1 – North Ayrshire Council reported emissions. 
2.5 Internal emissions are calculated by converting fuel used into tonnes of carbon dioxide
equivalent (tCO2e), using conversion factors published by the Department for Energy
Security and Net Zero.  These same conversion factors are used for PBCCD reporting.
For 2023/24 the final outturn of internal emissions was 20,745tCO2e.  This was
calculated from the sources noted in Table 2 below:
126

Page 127

Table 2 – 2023/24 final outturn of annual emissions from Council estate.
2.6 Graph 1 below is a representation of the Council’s carbon emission journey since the
baseline year of 2005/06. Through carbon reduction projects and policies, emissions
have reduced across buildings, waste, street lighting, staff travel and transport by
69.4% since 2005/06.  This is a reduction of 46,974tCO2e. 
Graph 1 – Council estate emissions in tonnes of carbon dioxide equivalent (tCO2e) 
2.7 In December 2023, Cabinet approved the Sustainable North Ayrshire (SNA) Strategy
2024-2027, which aims to tackle both the climate and nature crisis. One of the actions
within the SNA Strategy is to develop a Carbon Project Register, to identify carbon
reduction projects and monitor the emissions reduction associated with each project. 
Committing to carbon reduction projects in this way will better support annual
projections.  The Carbon Project Register is in development and will be initiated prior to
the end of the year.
2.8 One example of a project to be recorded would be the Irvine Locality Property Review. 
It is anticipated that approximately 286tCO2e/year will be saved through property
rationalisation in Phase 1 and 2.  Investigation into the decarbonisation of the non-
domestic estate and decarbonisation of fleet is well underway, with anticipated carbon
savings to be considered once all data has been collated and business cases
developed. 
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30Council Emissions (tCO
2e)
Year
Council Estate Emissions (tCO2e)
Forward Projection to 2030
127

Page 128

2.9 In order to progress with area-wide emission reduction, where the Council leads by
example and provides support to local businesses, community organisation and
households, officers are participating in the development of the Scottish Climate
Intelligence Service (SCIS).  The aim of this Scottish Government funded initiative is to
create a capacity-building programme with both a national digital platform and a
support service co-designed with stakeholders. The platform will collate area-wide
emissions data to build a baseline of emissions and calculate the emission reductions
of the actions and projects local authorities undertake in order to deliver the area-wide
emissions reduction strategies.
2.10 In addition to the ongoing works to reduce area-wide emissions, officers are
participants in the Ayrshire Climate Hub Community Forum, where we aim to utilise the
expertise within the group to support the implementation of Community Climate Action
Plans for each locality.
2.11 Furthermore, with the proposed Climate Change (Emissions Reduction) (Scotland) Bill
being laid before Parliament, it is anticipated that carbon budgeting will be the new
focus for reporting in future years.  A Scottish carbon budget will be a number of tCO2e
prescribed for a given period, and the target will be to not exceed the given budget. 
Progress through Parliament will be closely monitored by officers to better understand
the implications to the Council.
Scope 3 emissions
2.12 As noted previously, the Council does report on several scope 3 emissions, both
internally and through the mandatory annual reporting to Scottish Government in the
PBCCD report. For this year’s report (considering 2023/24 emissions) to be submitted
in November 2024, public bodies have been requested to ensure any “all emissions”
targets be clear on what is included and excluded in terms of scope emissions.  If the
public body has a net zero by 2030 target, an explanation must now be included as to
which scopes are included or not.
2.13 Public bodies have also been encouraged, to set and manage scope 3 targets more
effectively by splitting them into category or source e.g. waste, business travel,
procurement etc, rather than being grouped together as one target. Presently, the
Council report on overall carbon emissions and do not have separate targets for scope
1, 2 or 3 emissions. This will be actioned for the upcoming report.
2.14 Commuting, home working and procurement are noted to be currently under-reported
by the majority of public bodies.  This is due to difficulties in capturing and accessing
accurate data which would provide meaningful information. However, we aim to include
Scope 3 emissions on homeworking sources within the 2023/24 report. 
2.15 Corporate Procurement use the Flexible Framework Tool on an annual basis, which is
a self-assessment process that allows the Council to measure and monitor their
progress on sustainable procurement. Progress updates are provided in the annual
reporting, to evidence the Council’s consideration of scope 3 emissions. 
3. Proposals 
3.1 It is proposed that the committee note the progress and ongoing action to reduce
carbon emissions in North Ayrshire and expand on emissions sources reported both
internally and externally.  
128

Page 129

4. Implications/Socio-economic Duty
Financial
4.1 Delivery of the Sustainable North Ayrshire Strategy is not fully funded and
consideration will be required at future budget setting Council meetings regarding the
prioritisation of spend. Exploration of external funding opportunities and innovative
partnership models will also be critical in order to maximise investment and meet our
objectives. The financial implications for decarbonising the non-domestic estate are
anticipated to be positive as making buildings more energy efficient reduces the
financial burden on utility spend for the Council.  Investment Funding will be utilised to
implement the recommendations from the recent decarbonisation study.  Resource
has been committed to the fleet decarbonisation route map. 
Human Resources 
4.2 Previously vacant posts within the Sustainability service have been filled following a
robust recruitment exercise, and external funding is being maximised to support
temporary posts to deliver strategic projects, such as the Local Heat and Energy
Efficiency Strategy. 
Legal 
4.3 Under the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019, all
public bodies in Scotland have a duty to contribute to the delivery of the net zero
emissions target. The recently proposed Climate Change (Emissions Reduction)
(Scotland) Bill will introduce carbon budgeting instead of an emissions reduction
target. 
Equality/Socio-economic 
4.4 The ambition to decarbonise heating systems and improve energy efficiency in all
buildings contributes to our socio-economic duty by ensuring our homes and buildings
are well insulated and energy efficient, making them cheaper to heat and reducing
their emissions. 
Climate Change and Carbon 
4.5 This update provides progress on the Council’s net zero ambition and aspiration to
tackle the issue of ‘heat and fleet’ whilst also addressing area-wide emissions and
future scope 3 reporting. 
Key Priorities 
4.6 The works undertaken are in keeping with the aim ‘To achieve net-zero by 2030’
within the Council Plan 2023-28. 
129

Page 130

Community Wealth Building 
4.7 Community Wealth Building is at the heart of the Climate Change Steering Group, key
stakeholders in the development and delivery of the SNA, with opportunities to work
collaboratively are sought out and implemented. 
5. Consultation 
5.1 Progress updates have been provided from across various services for this report. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Laurence Cree, Head of Sustainability, Transport
and Corporate Property, on (01294) 324514. 
Background Papers
0
130

Page 131

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee 
Title:    Community Asset Transfer Process 
Purpose:  To provide the Committee with an update on the process for
Community Asset Transfer applications. 
Recommendation:  That the Committee:
a) notes the legal requirements around Community Asset
Transfer (CAT);
b) notes the North Ayrshire process for supporting Community
Asset Transfer requests in line with these requirements as
outlined in Appendices 1 and 2;
c) notes that CAT is one of a range of tools used to support
communities in North Ayrshire; and
d) notes the ongoing programme of work aligned to the CAT
application and delivery process. 
1. Executive Summary 
1.1 Community Asset Transfers were introduced as part of the Community Empowerment
(Scotland) Act 2015. The Act enshrined a right for community bodies to make requests
to all local authorities, Scottish Ministers and a range of other public bodies for any land
or buildings they feel they could make better use of. They can request ownership, lease
or other rights as they wish. 
1.2 Within North Ayrshire, we work closely with our community bodies to facilitate their
ambitions, including the use of Community Asset Transfer (CAT) where appropriate.
This is part of a range of supports we offer and an area of work where we continue to
learn and develop our processes over time. This paper follows a request by the Audit &
Scrutiny Committee, at its meeting of 21st March 2024, for an update on the CAT
process. The report outlines the legal process we are required to follow, the supports
we offer our community bodies around this, and the programme of work aligned to the
application and delivery process. 
2. Background 
2.1 The Community Empowerment (Scotland) Act 2015 introduced a right for community
bodies to make requests to all local authorities, Scottish Ministers and a range of other
public bodies for any land or buildings they feel they could make better use of. They can
request ownership, lease or other rights as they wish.
Agenda Item 7
131

Page 132

2.2 At the core of a Community Asset Transfer is the right to take over a public asset and
use it to better serve the local community. A key benefit to the community body is that
the costs associated with the transfer or lease will usually be considerably less than
market value.  The CAT process allows the Council to consider the social value of the
proposed use of the asset and offer a reduction on market value based on that, while
still fulfilling their responsibility of maintaining Best Value on the use of public assets. 
2.3 North Ayrshire Council had an Asset Transfer Policy in place prior to the enactment of
the legislation and has been actively supporting our communities to develop their social
capital and organisational capacity, including to undertake the management of
community facilities, for many years. The Community Empowerment Act and its
subsequent guidance provided an endorsement of our policy of individual and
community capacity building, leading to more active, resilient and responsible
communities where people provide a wide range of services to meet people’s expressed
need. 
2.4 To date, eight CATs have been fully completed. 11 are currently progressing through
the full application stage and a further 12 Expressions of Interest are being supported.
We are also aware of a further four groups considering making a formal approach. All
of these groups are provided with appropriate support as detailed below. An example
of a completed CAT is Irvine Tennis Club’s redevelopment of local tennis facilities.
Securing this community asset transfer provided the required legal status for the Club
to attract external funding, including £100,000 from SportScotland, which was invested
to develop the courts and deliver a range of opportunities to the local community. 
2.5 The use of Asset Transfer can have many benefits for communities, such as:
• To help meet a group's aspirations in the provision of services to the local community 
• It can support a group's development and business planning
• A group may be able to use an asset it in a more creative way that better meets
community needs
• Owning or long-term leasing an asset might allow a group to access funding for other
projects
• Providing the opportunity for an under-utilised Council asset which a group could
invest in for their community
• Ownership of an asset can develop a sense of pride in place and support sustainability
within communities 
2.6 Community Asset Transfer is one of many tools which the Council use to support
community groups to fulfil their aspirations. The approach supports the Council Plan
priority of Communities and Local Democracy by placing greater control in the hands of
communities. Community Asset Transfers are requested by a community group,
meaning that the control over the speed of the process, and whether or not it proceeds
to completion, often sits with the group. The process involved in a CAT itself can form
an important component of a group’s capacity building and helps them develop the skills
needed to run a community asset. 
2.7 The Act means that the Council must consider any requests made. Some assets are
exempt, such as castles and graveyards. Assets that are needed for the delivery of
critical Council services can be deemed unavailable, for example those where key
services are delivered. Assets which are in the process of being marketed can also be
deemed unavailable.
132

Page 133

2.8 Groups have to meet the legal definition of a community body as set out within the Act.
This means they must meet minimum standards of membership and have a constitution
which is compliant with the requirements of the Act before they can be considered for a
formal CAT. 
2.9 The delivery of the CAT process requires support across a range of Council services
and partners. This includes Connected Communities, Estates, Legal, Finance, the
Business Support Team, Streetscene, Property Management and Investment (PMI) and
the Third Sector Interface (TACT). Other services will also be involved as required e.g.
Housing where there is an implication for that service area. A Community Asset Transfer
Working Group meets regularly to review and update progress against live CAT interest
and to ensure that any learning is captured and the process adapted to reflect this. 
2.10 Not all CAT interests will proceed in the same manner. As explained above, much of
the control over the speed of the process is dependent on the group’s desire and
capacity to proceed. In addition, some assets are more complicated than others, for
example those which sit in the Common Good require an additional legal process to
obtain Sherriff Court approval to alienate them in order for a CAT to be concluded. The
process for assets which are part of the Council’s general fund assets is shown at
Appendix 1, and the process for those which are Common Good is detailed in Appendix
2 for information. 
2.11 Groups who are interested in a CAT are required to have robust business planning and
plans for their future sustainability in place.  There is a range of support which is
available to them to help with this and to help navigate the process. Across the
Connected Communities Team there is experience and advice on capacity building and
what they might need and expect if they decide to undertake an application. Once an
Expression of Interest is received, they will be allocated a Single Point of Contact in the
service to route their queries and communication. This will be someone who has local
knowledge of the area they are operating in and potentially experience of their sector,
for example the Active Schools Team supporting interest in sporting facilities. 
2.12 External and independent support is also available to groups and signposted as
required. TACT have an officer funded through the Council who is a source of advice
and expertise on CAT for all groups. DTAS (Development Trust Association Scotland)
have a local advisor through their Community Ownership Support Service who can also
offer independent advice as well as a range of resources which groups can use. The
Scottish Government offer a range of guidance including a model constitution which
groups are encouraged to adopt.  Thematic and umbrella organisations, for example
sports governing bodies or the Scottish Mens’ Shed Association, can be another source
of support. Finally, it is recommended that all groups appoint their own legal
representative to support them through the process and ensure they have impartial
advice. 
2.13  Learning from previous CAT applications has been adopted and the progress adapted
to reflect this. The first piece of learning is to always explore options as a CAT may not
always be the best for a group. Understanding what the group wants to achieve can at
times lead to a more suitable and sustainable solution which does not require either
party to undertake the extensive process associated with a formal CAT. 
133

Page 134

2.14 Full applications can only be considered once the applicant is a "community body" and
meets the definition as per the Scottish Government in relation to a CAT. This means,
along with other considerations, that their constitution must meet certain requirements
before the application can be progressed. Validation letters will only be issued once the
application form and all supporting documents have been received in order to complete
the assessment. This helps manage expectations regarding timescales for all parties
and ensures that the groups are in a position to proceed without additional delays should
the assessment be positive. 
2.15 Where an asset is more complex, for example those held in trust by the Council or those
belonging to the Housing Revenue Account or Common Good, we undertake greater
internal due diligence before inviting a full application. This means that we know the
asset can be released and can also advise the group of the additional process that will
need to be undertaken to do so and what this might mean for any timescales. 
2.16 At their meeting of 15 June 2021, the Cabinet approved the creation of a £1 million fund
to support the CAT process. This CAT Start Up Fund has enabled a post to be created
within The Ayrshire Community Trust (TACT), part of the North Ayrshire Third Sector
Interface, to work with groups on their applications and plans. It has also enabled a
series of improvement works on assets to ensure they are in a suitable condition for the
group to be able to operate. In many cases groups have been able to secure match
funding or in kind support to supplement the demand on this Fund. An example of this
is the recent work carried out by Building Services Modern Apprentices using materials
purchased through the Fund to support a group to meet Building Regulations and
progress to full ownership of an asset. Other examples are a new boiler fitted prior to
handover at Almswall Park as the existing boiler was at a the end of its useful life, and
support to Ardrossan Community Development Trust to have a new power supply fitted
when the asset was disconnected from the NAC supply on the prom. To date, 12 groups
have been supported directly via the fund. In addition, the fund supports preparatory
work such as checking Title Deeds of assets, securing external legal advice as and
when required and the costs of the Sheriff Court process of alienation in the case of
Common Good assets. 
2.17  A programme of work is being delivered jointly by Connected Communities and PMI
staff to identify the best use of the remaining uncommitted funds. This includes condition
survey work on assets where there is live CAT interest and the identification of priorities
for the best use of the remainder of the fund. 
Future Programme of Work 
2.18 Each group which makes a CAT application and each asset itself are different and the
process will vary as a result of this. This means that the support and the journey for
each application will differ and the services involved need to ensure they are agile in
their approach while still meeting all of the legal and due diligence requirements
involved. Nonethless, there is a programme of ongoing work in place to ensure that our
CAT process continues to evolve and reflects our Council Plan priority of Communities
& Local Democracy, in particular the aim of ‘supporting community asset transfer and
community owned and operated/managed assets’ alongside our Community Wealth
Building ambitions. 
134

Page 135

2.19 Key areas of focus include:
• Continuing the extensive programme of work associated with expenditure of the CAT
Fund noted at paragraph 2.16 and 2.17 above
• Evaluation of the impending outcome of the review of the Community Empowerment
(Scotland) Act which the Scottish Government is currently undertaking and then
implementing any necessary changes as a result of this
• Continued monitoring of developments through national networks and corresponding
updating of processes, particularly for assets held in trusts, Common Good and
Housing Revenue Accounts to see where good practice can be shared
• Building capacity and resilience across the Council by having a wider group of officers
who are experienced in the CAT process, with associated time to upskill and embed
the new approach. This is an important part of our workforce planning approach
following changes in personnel as part of the Council’'s reduced resource envelope 
3. Proposals 
3.1 That the Committee:
a) notes the legal requirements around Community Asset Transfer (CAT):
b) notes the North Ayrshire process for supporting Community Asset Transfer requests in
line with these requirements as outlined in Appendices 1 and 2;
c) notes that CAT is one of a range of tools used to support communities in North Ayrshire;
and
d) notes the ongoing programme of work aligned to the CAT application and delivery
process. 
4. Implications/Socio-economic Duty 
Financial 
4.1 CAT lease or sale can assist the Council in reducing ongoing costs for buildings and
assets while maintaining their continued use for communities, however this is not the
main driver of the process. 
Human Resources 
4.2 None. 
Legal 
4.3 CAT processes follow the requirements of the Community Empowerment (Scotland)
Act 2015. 
Equality/Socio-economic 
4.4 The use of CAT can give greater control and opportunities to communities facing
inequalities. 
135

Page 136

Climate Change and Carbon 
4.5 Community bodies making CAT proposals are given advice on climate friendly
resources and funding available to them by the Council’s Sustainability team to assist
them in the future running of their asset should it proceed. 
Key Priorities 
4.6 This work supports the Council Plan priority of Communities & Local Democracy, in
particular the aim of ‘supporting community asset transfer and community owned and
operated/managed assets’ 
Community Wealth Building 
4.7 Community Asset Transfer has a direct impact upon the Community Wealth Building
pillar of making the best use of assets by allowing local control and access to public
sector assets which can then be utilised more effectively for the needs of the
community. 
5. Consultation 
5.1 Each CAT requires consultation with the local community to ensure support for the
proposal made by the community body. 
David W. Hammond
Executive Director, Communities and Housing 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1 – CAT process map
Appendix 2 – Common Good Assets CAT process map 
136

Page 137

North Ayrshire Council - Community Asset Transfer Applicant Form Process
Expression of Interest (EOI)
Send EOI form to Applicant
Completed form received
from Applicant. 
NAC to acknowledge receipt
of form 
Asset Suitability
• Is the asset available?
• Is the Applicant a
compliant body?
Send Asset Suitability form together with links to EOI form and plan to
Estates. Form to be returned within 7 days.
Asset not available for transfer Asset available for transfer
Send Asset Suitability form together with links to EOI form, plan
and constitution to Legal. Form to be returned within 7 days.
Send Full Application to Applicant.   
A Single Point of Contact (SPOC) will be
appointed from NAC to support Applicant.
Do not support application Support application
ESTATES ASSESSMENT
Plan and Constitution must be returned with this form. 
Applicant to be notified giving reasons.
Applicant to be notified giving reasons.
Go to Legal
LEGAL ASSESSMENT
Appendix 1
137

Page 138

Full Application (FA)
Completed form and supporting documents received from Applicant. 
Applicant
Public Notice and Validation
letter sent to Applicant.
NAC – CAT -Website
Public Notice and redacted FA
published on website for
representations.  After 20
working days of notification,
both documents are removed
from website and any
representations are copied to
Applicant. 
Applicant has 20 working days to
comment on any
representations.
CAT Officer’s Assessment
FA assessments sent to
SPOC/Estates/Legal/Finance/
Business Team (Officers’ have 8
weeks to complete). 
Collate Officer’s assessments
and review at CAT Officer’s
meeting. 
Approved Not Approved
Public Notice displayed on asset
by Applicant for 20 working
Go to Cabinet SPOC to inform the
Applicant and offer
support to
strengthen the
application for
resubmission where
appropriate.
138

Page 139

Not Approved Approved
Cabinet
Decision notice sent to applicant. The
Applicant can appeal within 20 working days.
Decision notice sent to applicant.
NAC Legal will develop a draft offer.  The
offer will be issued to the Applicant’s
Solicitor.  Negotiations take place between
solicitors to reach a mutually agreeable
decision.
Contract concluded between NAC Solicitor
and Applicant Solicitor.
Final arrangements are made for handover.
Transfer takes place.
139

Page 140

North Ayrshire Council - Community Asset Transfer Applicant Form Process
Common Good 
Expression of Interest (EOI)
Send EOI form to Applicant
Completed form received
from Applicant. 
NAC to acknowledge receipt
of form 
Asset Suitability
• Is the asset available?
• Is the Applicant a
compliant body? Send Asset Suitability form together with links to EOI form and plan to
Estates. Form to be returned within 7 days.
Asset not available for transfer Asset available for transfer
Send Asset Suitability form together with links to EOI form, plan
and constitution to Legal. Form to be returned within 7 days.
Send Full Application to Applicant.   
A Single Point of Contact (SPOC) will be
appointed from NAC to support Applicant.
Do not support application Support application
ESTATES ASSESSMENT
Plan and Constitution must be returned with this form. 
Applicant to be notified giving reasons.
Applicant to be notified giving reasons.
Go to Legal
LEGAL ASSESSMENT
Appendix 2
140

Page 141

Full Application (FA)
Completed form and supporting documents received from Applicant. 
Public Notice and Validation
letter sent to Applicant.
Public Notice displayed on
asset in public buildings by
NAC for 40 working days
and local press.
CAT Officer’s Assessment
FA assessments sent to
SPOC/Estates/Legal/Finance/
Business Team (Officers’ have 8
weeks to complete). 
Collate Officer’s assessments
and review at CAT Officer’s
meeting. 
Public Notice displayed on
asset by Applicant for 40
working days.
Public Notice
Public Notice and plan sent
to Community Council.
Approved Not Approved
Go to Cabinet SPOC to inform the Applicant and
offer support to strengthen the
application for resubmission
where appropriate. 
Public Notice and redacted FA
published on NAC website for
representations.  After 40
working days of notification,
both documents are removed
from website and any
representations are copied to
Applicant. 
Applicant has 20 working days to
comment on any
representations.
141

Page 142

Not Approved Approved
Cabinet
Decision notice sent to applicant. The
Applicant can appeal within 20 working days. 
Legal to go to court for alienation.
NAC Legal will develop a draft offer.  The
offer will be issued to the Applicant’s
Solicitor.  Negotiations take place between
solicitors to reach a mutually agreeable
decision. 
Contract concluded between NAC Solicitor
and Applicant Solicitor.
Final arrangements are made for handover. 
Transfer takes place. 
Decision notice sent to applicant. 
142

Page 143

NORTH AYRSHIRE COUNCIL
31 October 2024                                                                                                                                                            
Audit & Scrutiny Committee
Title: Annual Assurance Statement to the Scottish Housing
Regulator 2023/24
Purpose: To advise the Committee of the Council’s Annual Return on the
Charter 2023/24 submission and request endorsement of the
Annual Assurance Statement to be submitted to the Scottish
Housing Regulator.
Recommendation: That the Committee: (i) notes the Annual Return on the Charter
submission 2023/24; (ii) notes the supporting evidence provided
to demonstrate compliance with the regulatory framework and
relevant legislation; (iii) notes the Council’s areas of non-
compliance detailed at paragraphs 2.24-29; and (iv) authorises
the Chair to sign the Annual Assurance Statement at Appendix
1.
1. Executive Summary
1.1 The Scottish Housing Regulator’s framework for the regulation of social housing in
Scotland includes the requirement for an Annual Assurance Statement to be
submitted alongside the Annual Return on the Charter (ARC). The statement must be
approved by the appropriate Committee within the organisation prior to submission to
the Scottish Housing Regulator (SHR) by 31st October 2024. A copy of this year’s
statement is provided at Appendix 1.
1.2 This report provides information on the performance reported in the ARC, highlighting
areas of high or improving performance, areas requiring improvement, and areas of
non-compliance. The report also provides information at Appendix 2 on how the
Council gains assurance that it is compliant with the regulatory framework.
1.3 Endorsement of the Annual Assurance Statement will ensure that the Council
complies with regulatory requirements set out in the Housing (Scotland) Act 2010.
2. Background
2.1 The Housing (Scotland) Act 2010 sets out the statutory objectives, functions, duties,
and powers of the SHR, a non-ministerial department responsible for regulating social
housing in Scotland.
Agenda Item 8
143

Page 144

2.2 In 2012, the Scottish Government’s Social Housing Charter was established. It sets
out the standards and outcomes that tenants, homeless people, homeowners, and
gypsy/travellers can expect from social landlords. This is monitored via landlords’
annual ARC submissions to the SHR. 
2.3 In February 2019, the Scottish Housing Regulator issued a revised framework for the
regulation of social housing in Scotland. The new framework includes the requirement
for landlords to submit an Annual Assurance Statement which has been agreed by a
Board or Committee within the organisation. The Council must provide assurance that
it complies with the relevant requirements of Chapter 3 of the Regulatory Framework. 
2.4 The Assurance Statement is confirmation that, as a landlord, the Council: 
• meets all legal duties and responsibilities, and adheres to relevant guidance and
the requirements of other regulators
• meets its statutory duties to prevent and alleviate homelessness
• adheres to statutory guidance from the Scottish Housing Regulator
• takes account of regulatory advice from the Scottish Housing Regulator and from
other regulators
• complies with all regulatory requirements 
The Council must also confirm plans to address any instances where there is a
material non-compliance and notify the SHR about any material changes in their level
of assurance during the year. 
2.5 North Ayrshire Council’s 2023/24 ARC was submitted to the SHR on 31 May 2024.
The return provided details of the Council’s performance across a range of indicators
within the Charter outcomes. Prior to submission of the ARC, a meeting was held on
29 May 2024 with the North Ayrshire Network (NAN), which is our tenant group with
representation from local Tenants and Residents Associations (TARAs).  At the
meeting a range of indicators were discussed, with information on levels of
performance and a comparison with 2022/23 data provided to the NAN members. 
2.6 The SHR requires landlords to provide assurance in their Statement that they have
developed an effective approach to the collection of equalities information and that
they have considered how they can adopt a human rights approach in their work. 
2.7 As a landlord, North Ayrshire Council collects data relating to each of the protected
characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who are at risk of homelessness and service users on
our Gypsy/ Traveller site. A systems review is currently being undertaken alongside
our partner landlords within the North Ayrshire Housing Register, which incorporates
further development of our approach to collation of equalities data within the brief for
the review. Access to good quality housing is recognised as a basic human right and
providing this to everyone in North Ayrshire is a key priority, including ensuring
accommodation is provided to homeless households, tenancy sustainment, dedicated
site to meet the needs of Gypsy/ Travellers, standards of Council-owned
accommodation are well maintained and continuing to deliver our new house building
programme. 
144

Page 145

Performance 
2.8 Comparative information from other local authorities for the 2023/24 ARC is not yet
available. The 2022/23 comparisons from the Scottish Social Housing Charter show
that North Ayrshire Council remains a high performing local authority housing service.
Of the 37 indicators reported in 2022/23, ranked against other Scottish local
authorities North Ayrshire is in: 
• The top quartile for 16 indicators (44%)
• The second quartile for 6 indicators (16%)
• The third quartile for 9 indicators (24%)
• The bottom quartile for 6 indicators (16%) 
2.9 When the 2023/24 comparisons are published, indicators will be scrutinised and plans
developed to sustain areas of high performance and to address areas for
improvement. 
2.10 Housing Services has implemented a Performance Management Framework which
ensures monthly monitoring is in place with regards to future ARC returns and other
performance related data required for the SHR and internal scrutiny.  A Housing
Transformation Board continues to monitor improvement workstreams to increase
performance in areas such as rent arrears, aids & adaptations, void management,
repairs policy and homeless prevention. 
2.11 The areas highlighted below identify key areas of high or improving performance as
reported in our ARC return for 2023/24, alongside areas where there has been a
decline, or where improvement is required.  
Areas of high or improving performance 
2.12 Tenant satisfaction is high in terms of overall services as a landlord (88.74%), and
opportunities for tenants to participate and keep informed about services (85.49%)
and decisions (91.88%). Performance in this area is based on our tri-annual tenant
satisfaction survey, which took place during summer 2021 to provide an updated
position for the 2021/22 ARC submission. The next survey is scheduled to take place
during quarter three of 2024/25 which will inform the position for the 2024/25 ARC
submission. 
2.13 The average length of time taken to complete emergency repairs decreased from 2.64
hours in 2022/23 to 2.12 hours, and from 8.42 to 7.60 days for non-emergency
repairs. The increase in performance is due to the introduction of a new ‘Handyman’
post which allow Building Services to complete a higher volume of routine multi-trade
jobs and allow more time for qualified operatives to undertake more complex, trade
specific works. The move to this planned approach to works has improved the
average response times for both emergency and non-emergency repairs.  We
continue to remain well within our four-hour target for emergencies as per North
Ayrshire Council’s Housing Repairs Policy. 
2.14 Satisfaction levels of tenants who had repairs or maintenance carried out in the last
12 months has increased from 86.16% to 97.51% since 2022/23. This is based on
1,564 responses received during 2023/24. The increase is due to tenants now having
the ability to complete a satisfaction survey in real time on the tradesperson’s
145

Page 146

electronic device. This new approach commenced during September 2023. Despite
this improvement, work is continuing to ascertain the most appropriate method of
collating this performance information to support continuous improvement in the
number of responses received.
2.15 There has been an improvement in performance relating to the adaptations process,
with the number of households waiting on an adaptation to their home decreasing
from 465 in 2022/23 to 302 in 2023/24. The average number of days to complete an
approved adaptation also decreased from 92.38 to 90.59 days. A joint improvement
group, with membership from the Health and Social Care Partnership, Housing,
Building Services and Property Management and Investment continue to review
demand for adapted properties and existing processes to consider ways to achieve
the best possible outcome for tenants and demonstrate best value for their rent.
2.16 Gross rent arrears as a percentage of rent due decreased from 7.14% in 2022/23 to
5.88% in 2023/24. Housing Operations staff have been undertaking our escalation
process to recover rent arrears where possible and have re-started court action for
rent arrears over £2,250.  We continue to take a welfare-based approach, contacting
tenants and offering general advice/assistance on welfare benefits, income
maximisation and alternative ways to pay rent due to the impact of the pandemic and
the cost-of-living crisis. This support alongside rent arrears recovery action has
resulted in improved performance in this area. 
Areas with a decline in performance or requiring improvement
2.17 The percentage of antisocial behaviour cases resolved during 2023/24 was 91.78%, a
slight decrease of 1.04% on last year’s performance of 92.82%.  However, our
performance against locally agreed targets is 100% of cases resolved within agreed
timescales, against a target of 94%.
2.18 Approaches for homeless assistance in North Ayrshire increased by 6% in 2023/24
compared to the previous year. The annual national performance statistics published
by the Scottish Government has reported that homelessness is at the highest level
since 2011/12, with the number of open homelessness applications and households in
temporary accommodation reaching the highest on record. The main reason for
homelessness in North Ayrshire during 2023/24 was as a result of a relationship
breakdown, accounting for 254 approaches (21.78%). This is followed by people being
asked to leave the family home, which accounted for 219 (18.78%) approaches.  
2.19 Whilst there is increasing pressure on the housing system locally in North Ayrshire, a
range of measures are in hand to respond to this, including increasing housing supply,
ensuring our empty properties are turned around as quickly as possible for re-let, and
managing the demand from homeless people by way of temporary and the supply of
permanent accommodation. We have changed the service delivery model within
Housing/Homelessness services to enable prevention activities to be undertaken at a
locality level with newly integrated teams working to identify the service priorities
within each locality.  This is to ensure that there is a joined-up response to our tenants
and residents by resolving any issues as they arise at a local level. The
Homelessness Task Force that we have in place comprises of a range of stakeholders
who are working to analyse the variety of datasets we have at our disposal.  The
purpose of this is to understand the changing dynamics of the homelessness system
and risk factors.  The work of the task force includes preparation of a new Prevention
146

Page 147

Strategy, which will consider all of the levers at our disposal to balance the system
and will also be aligned to the new Housing (Scotland) Bill 2024. In addition, a key
component of our current allocations policy review is to understand the impact of
increased lets to homeless households and the options available for mitigation. 
2.20 The average time taken to re-let properties increased slightly from 23.99 days in
2022/23 to 26.86 days in 2023/24. During 2023/24 void performance was impacted
due to issues with utility meters. This issue is recognised nationally and has been
escalated to the Scottish Government for action. Housing Services are working
closely with Building Services to review the current void processes as part of the
Housing Transformation Board workstream. The aim of the project is to ensure the
delivery of an effective and efficient service that not only creates efficiencies but also
assists to futureproof the housing stock. 
2.21 The percentage of tenancy offers refused during the year increased slightly from
37.24% to 42.45%. This is attributable to an increase in refusals from tenants on the
housing waiting list who have an identified accessible housing need who are looking to
transfer from an existing tenancy.  We do not impose any penalties to applicants for
refusing offers of housing that are made via the North Ayrshire Housing Allocation
Policy.  This could have led to applicants receiving multiple offers of housing and
refusals being made, therefore the decline in performance may not be a true
reflection.  Also, through local knowledge and feedback, we have been made aware
that applicants' expectations are for housing or re-housing in our new build
developments. In order to evidence the impact a detailed analysis of refusals will be
carried out as part of the review of the allocation policy during 2024/2025.   
2.22 For 2023/24 the number of court actions resulting in eviction decreased from 100% in
2022/23 (based on one case for antisocial behaviour) to 11.22%. 10 evictions were
due to rent arrears over £2,250 and one was due to antisocial behaviour. The Scottish
Government removed the ban for court action for arrears cases at any level on 31
March 2024, therefore the number of evictions during 2024/25 is expected to increase
further.
2.23 Rent arrears in 2023/24 for tenants in receipt of Universal credit saw a larger increase
than in previous years. Rent arrears attributed from tenants in receipt of Universal
Credit has increased by 9.2%, in comparison to an increase of 4.5% the previous
year. The Welfare Reform Team continue to support tenants with Universal Credit
claims. Many high rent arrears cases are generally more complex to manage and
require intensive support from the team. Financial Inclusion Officers are responsible
for supporting our most vulnerable tenants, or those with complex needs with claiming
and maintaining Universal Credit claims. This support will become more valuable as
more tenants move to Universal Credit through the managed migration process. Our
performance in relation to rent arrears is monitored by the Housing Services
leadership team on a monthly basis with detailed information provided at a local level. 
Area of non-compliance
2.24 Our two areas of non-compliance relate to gas safety and Electrical Installation
Condition Reporting (EICR). In early 2023, a cross-service working group was
established to address our performance in this area. An improvement plan was
developed and implemented which has delivered a sustained increase in performance
as noted below. However, our target is 100% compliance and efforts continue to close
147

Page 148

the remaining gap. As part of our improvement plan, a dedicated Compliance Team
within PMI has been created, supported by additional resources. An update on gas
safety and EICR is provided below. 
Gas Safety 
2.25 During 2023/24, 25 properties did not receive their annual gas safety check within the
statutory timescales. We have faced challenges over the reporting year due to system
issues and gaining access to properties to carry out statutory compliance works
following persistent and unprecedented levels of access refusals post pandemic. The
number of failures in 2022/23 was 106, representing a 75% reduction from the
previous year. In the year to date, 1 failure has been recorded, a further significant
improvement and evidence that the actions taken continue to have the desired effect. 
2.26 All efforts were made to ensure compliance at the earliest opportunity and appropriate
records were kept.  All 25 of the properties which failed compliance during 2023/24
were completed by 31 March 2024. 
Electrical Testing 
2.27 In April 2020 new legislation was introduced which reduced the statutory inspection
regime for electrical installations from ten to five years with a target compliance date
of 31 March 2022. The pandemic interrupted the testing programme which resumed
during 2021. At the end of 2023/24, 2,821 properties were non-compliant, 21.29% of
our total housing stock. 
2.28 Property Management & Investment engaged two contractors during 2021 to
undertake the testing programme to try and achieve compliance by the 31 March
2022 deadline. As noted above, while accessing properties remains a challenge,
performance has continued to improve with the pass rate increasing from 2022/2023
to 79.02% in 2023/24. The Council’s access policy has been extended to enable
electrical inspections to be undertaken, similar to the arrangements already in place
for gas compliance checks. This commenced during August 2023. 
2.29 All efforts were made to ensure compliance at the earliest opportunity and appropriate
records were kept; we have considered this a material non-compliance and the SHR
was informed during 2023/24 of the expected outcome. Property Management and
Investment have been providing monthly updates to the SHR since January 2023.  
Assurance 
2.30 The overall performance of the Housing Service is continuously reviewed by the Head
of Service and Housing Senior Management Team on a monthly basis, with key
performance information and action plans presented to the North Ayrshire Network,
Housing Business Plan Group and Council’s Cabinet regularly during each year. 
2.31 Some ARC indicators also form part of the corporate performance monitoring
framework, scrutinised by Chief Officers and elected members. 
2.32 The Scottish Federation of Housing Associations (SFHA) Self Assurance Toolkit has
also been utilised as a further method of self-assessment. The toolkit provides
guidance to social landlords on gathering evidence to demonstrate compliance with
148

Page 149

regulatory requirements and standard and focuses on questions that governing bodies
should ask to gain assurance that this is being achieved. 
2.33 Housing Services commissioned the Scottish Housing Network to independently
validate our 2023/24 ARC submission during October 2024 to scrutinise performance
and to highlight any further areas for improvement. The report has identified the need
for a review of the approach to a number of indicators. An action plan has been
created to take forward this exercise in advance of the 2024/25 ARC.  A report will be
brought to a future Audit & Scrutiny meeting to provide an update on the outcome of
the review work.  The SHR are aware of this approach and supportive of the validation
exercise.   
2.34 The ARC 2023/24, which can be accessed at Annual Return on the Charter (north-
ayrshire.gov.uk), demonstrates the Council’s performance against the outcomes in the
Scottish Social Housing Charter. 
2.35 Supporting evidence to demonstrate compliance with the regulatory framework and
relevant legislation is attached at Appendix 2. 
2.36 The Annual Assurance Statement, which is attached at Appendix 1, confirms that the
Council has complied with the regulatory framework, all standards, and outcomes. It
highlights North Ayrshire’s non-compliance with our legal responsibilities around gas
and electrical safety. It also confirms the equalities data currently captured, and how
North Ayrshire adopts a human rights approach in our work. This Statement will be
made available to tenants as part of the Council’s performance reporting process. 
3. Proposals 
3.1 It is proposed that the Committee (i) notes the Annual Return on the Charter
submission 2023/24; (ii) notes the supporting evidence provided to demonstrate
compliance with the regulatory framework and relevant legislation; (iii) notes the
Council’s areas of non-compliance detailed at paragraphs 2.24-29; and (iv) authorises
the Chair to sign the Annual Assurance Statement at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 Approval of the Annual Return on the Charter submission 2023/24 and supporting
evidence, and signature of the Annual Assurance Statement, will ensure that the
Council complies with regulatory requirements set out in the Housing (Scotland) Act
2010. 
149

Page 150

Equality/Socio-economic
4.4 As a landlord, data is collated relating to each of the protected characteristics for
existing tenants, new tenants, people on waiting lists, governing body members, staff,
people who apply to us as homeless and service users on our Gypsy/Traveller site. 
This data is used to inform decision making, policy making and day to day service
delivery. 
Environmental and Sustainability
4.5 None.
Key Priorities 
4.6 The matters referred to in this report contribute to all four of the Council Plan priorities;
Wellbeing, Climate Change, A Sustainable Council and Communities and Local
Democracy by ensuring our housing stock is well maintained, energy efficient and
compliant with all statutory duties. Housing Services ensure housing stock investment
and compliance are consulted with and reported to our North Ayrshire Network (NAN)
tenants group and other affected services.
Community Wealth Building
4.7 None.
5. Consultation
5.1 Consultation has taken place with Services within Housing and Public Protection;
Sustainability, Transport and Corporate Property; Corporate Performance; the Health
and Social Care Partnership; Tenant representatives and the Scottish Housing
Regulator during the preparation of the Annual Return on the Charter and Annual
Assurance Statement.
David W. Hammond
Executive Director (Communities & Housing)
For further information please contact Fiona Ellis, Senior Manager (Housing Strategy &
Development, on 01294 324031. 
Background Papers
Appendix 1 - Annual Assurance Statement
Appendix 2 - Supporting Evidence Document
150

Page 151

Appendix 1
North Ayrshire Council
Annual Assurance Statement
2023/24
North Ayrshire Council complies with the requirements set out in Chapter 3 of the
Regulatory Framework. North Ayrshire Council is assured that we:
 Adhere to relevant guidance and the requirements of other regulators;
 Meet our statutory duties to prevent and alleviate homelessness;
 Adhere to statutory guidance from the Scottish Housing Regulator;
 Take account of regulatory advice from the Scottish Housing Regulator and from
other regulators; and
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance.
We did not meet our legal obligations around tenant and resident safety as we did not
comply with gas safety legislation for 25 properties and electrical testing for 2,821
properties during 2023/24.  The most significant challenge during 2023/24 has been
gaining access to properties to carry out statutory compliance works following
persistent and unprecedented access refusal rates post pandemic.  All efforts were
made to ensure compliance at the earliest opportunity and appropriate records were
kept. The Scottish Housing Regulator was notified of this expected outcome at the
earliest opportunity and was provided with monthly updates during 2023/24. 
As a landlord, we collect data relating to protected characteristics for existing tenants,
new tenants, people on waiting lists, governing body members, staff, people who apply
to us as homeless and service users on our Gypsy/Traveller site.  A systems review
is currently being undertaken alongside our partner landlords within the North Ayrshire
Housing Register, which incorporates further development of our approach to collation
of equalities data within the brief for the review.  We recognise that the right to housing
is a human right and providing this to everyone in North Ayrshire is of the highest
priority with work already taking place across a range of activities.
North Ayrshire Council’s Audit and Scrutiny Committee has considered sufficient
evidence to give this assurance.  The Annual Assurance Statement was approved by
Audit and Scrutiny Committee on 31 October 2024.
Authorised by:________________________
Chairperson of the Committee
Printed name: ________________________
Date:_______________________________
151

Page 152

Appendix 2
North Ayrshire Council
Housing Services
Annual Assurance Statement
2023/24
Supporting Evidence
October 2024
152

Page 153

Appendix 2
Introduction
In February 2019, the Scottish Housing Regulator (SHR) issued a revised framework for the regulation of social housing in Scotland.  The new
framework includes the requirement for landlords to submit an Annual Assurance Statement which has been agreed by a Board or Committee within
the organisation.  We must provide assurance that the organisation complies with the relevant requirements of Chapter 3 of the Regulatory Framework.
This document provides evidence to support our Statement that North Ayrshire Council is assured that we:
 Adhere to relevant guidance and the requirements of other regulators;
 Meet our statutory duties to prevent and alleviate homelessness;
 Adhere to statutory guidance from the Scottish Housing Regulator;
 Take account of regulatory advice from the Scottish Housing Regulator and from other regulators; and
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Tenant and resident safety
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance.
As a landlord, we are also required to meet all legal duties and responsibilities.  During 2023/24 we were unable to do this, as some properties did
not have an annual gas safety check carried out or an electrical safety certificate in place within the legal timescales due primarily to issues in gaining
access to tenants’ homes.  We have provided information on this non-compliance in our Annual Assurance Statement and further detail in this
supporting evidence.
The Scottish Housing Regulator contacted all local authorities and RSLs in March 2024 to ask landlords to include further assurance around tenant
and resident safety in their 2023/24 Annual Assurance Statement, in particular:
• Gas safety
• Electrical safety
• Water safety
• Fire safety
• Asbestos
• Dampness and mould
153

Page 154

Appendix 2 
• Lift safety 
The Scottish Housing Regulator has requested that landlords provide assurance in their Statement that they have appropriate plans to implement an
effective approach to the collection of equalities information and that they have started to consider how they can adopt a human rights approach in
their work. 
Regulatory Requirements 
Assurance and notification
We prepare an Annual Assurance Statement in accordance with guidance and submit it to the Scottish Housing Regulator (SHR) annually.  The
statement is available to tenants and other service users.  We will notify the SHR during the year of any material changes to our assurance as set out
in the Statement.   
We can evidence that we meet all legal obligations associated with housing and homelessness services, and equality and human rights. 
We have not met our legal obligations around tenant and resident safety as we did not comply with gas safety legislation for 25 properties during
2023/24.  Due to new legislation introduced during 2021/22 regarding electrical testing, 2,821 properties were non-compliant with regards to having
an electrical installation condition report (EICR) in place during 2023/24. There continues to be an ongoing reluctance by some tenants to grant access
to their property; this is an issue we are working to address alongside system issues. In early 2023, a cross-service working group was established
to address our performance in this area.  An improvement plan was developed and implemented which has delivered a sustained increase in
performance from 2022/23. As part of our improvement plan, a dedicated Compliance Team within PMI has been created, supported by additional
resources. We have considered this a material non-compliance and informed the SHR during 2023/24 of this expected outcome and continued to
provide them with monthly updates.   
We notify the SHR of any tenant and resident safety matters involving the Health and Safety Executive or reports from other regulatory bodies relating
to safety concerns.  There were no issues to report during 2023/24. 
‘Customer Connections’, our Customer Participation Strategy, is available to tenants and service users on the Council website.  
Customer Connections Strategy (north-ayrshire.gov.uk) 
Tenant and service user redress
Information on how to report any concerns around significant performance failures is available to tenants.  Further information is contained in the
Scottish Housing Regulator leaflet. 
North Ayrshire Council’s Complaints Handling Procedure is readily available to tenants and other service users.  It sets out the information they need
to exercise their right to complain and seek redress.  Responses are provided within timescales set out in the procedure, in accordance with guidance
154

Page 155

Appendix 2 
from the Scottish Public Services Ombudsman (SPSO).  We have mechanisms in place to learn from complaints and other tenant and service user
feedback, in accordance with SPSO guidance. 
Whistleblowing
North Ayrshire Council has a policy and procedure in line with the Public Interest Disclosure Act 1998 for whistleblowing by staff and elected members.  This is readily available
on the Council website and promoted through staff bulletins.  Equalities and human rights
Equality is one of North Ayrshire Council's core values.   The principles of equality and fairness are central to all council activities.  Our Equality and
Children’s Rights Impact Assessment process for all policies, procedures and proposals ensures we meet legislative requirements.  All decisions
made by the Council’s committees include an assessment of equalities implications. 
As a landlord, we collect data relating to each of the protected characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who apply to us as homeless and service users on our Gypsy/Traveller site.  We use this data to inform decision making,
policy making and day to day service delivery. We provide a diverse range of services, and we want to ensure everyone has the same opportunity to
access services and that they meet the needs and value the diversity for all our customers. We are currently undergoing a system review alongside
our partner landlords within the North Ayrshire Housing Register and have incorporated equalities data into the brief to further develop our approach. 
We recognise that access to good quality housing is a basic human right and providing this to everyone in North Ayrshire is of the highest priority. 
Work already takes place across a range of activities: ensuring that accommodation is provided to homeless households when needed; housing
support services are provided to council tenants and homeless households to help sustain tenancies; there is a dedicated site to meet the needs of
Gypsy/ Travellers; standards of Council-owned accommodation are well maintained and align to the Scottish Housing Quality Standard (SHQS); and
we carry out adaptations to properties to make them more accessible for households with disabilities. 
Scottish Social Housing Charter Performance
We submit an Annual Return on the Charter to the Scottish Housing Regulator annually in accordance with published guidance.  We have agreed our
approach to this through the North Ayrshire Network (NAN), a group of representatives from the various Registered Tenant Organisations in North
Ayrshire.  You can read about our approach in ‘Customer Connections’, our Customer Participation Strategy 2023 - 2028. 
Each year, we report on performance in our autumn edition of Tenancy Matters.  The NAN work with us to agree the content of the report, which
includes comparisons with previous years, other landlords and national performance.  Within this report we identify how we will address areas for
improvement and ask for feedback on our approach. 
Standard 1 – The customer / landlord relationship 
155

Page 156

Appendix 2 
Outcomes: 
Equalities 
We promote equality and embrace diversity in all parts of Housing Services.  All the information we produce is in line with the Council’s
Communications Strategy. All leaflets, and a number of documents, are published in plain English and can be made available in large print, braille,
tape or CD, and can be translated on request. 
Communication 
Housing Services provide a comprehensive range of information which is made available in leaflets, on the Council website and on social media.  The
Tenant Editorial Panel approves all leaflets prior to issue to ensure they are fit for purpose and easy to understand. Our ‘tenant approved’ logo shows
tenants have endorsed our publications. In recent years we have developed a social media profile through Facebook and Twitter to encourage digital
engagement with a wider and more diverse customer base.   
We commission an independent organisation to undertake a tenant satisfaction survey at least every three years.  The results of these surveys help
us to focus our efforts in improving communication and participation and understand what is important to our customers.  Our next survey is scheduled
take place during quarter three of 2024/25. 
Participation 
The North Ayrshire Network (NAN) customer group has responsibility for ensuring that we continually improve the way we deliver services to tenants
and customers. Part of their role is to challenge our performance against the indicators, outcomes, and standards in the Charter.  To do this, Housing
Services report to the Network through presenting on performance both mid-year and prior to submitting the Charter annually, working together on
developing our annual report to tenants and communicating any changes from the Scottish Housing Regulator directly to the group. 
Our Tenant Inspection Panel scrutinise one area of service per year. They can decide this independently through review of our performance
information, or with support from Officers. Scrutiny provides an opportunity for tenants to drive improvement in the services most important to them.   
We have reviewed/ relaunched our Customer Participation Strategy for 2023 - 2028 which encompasses the requirements of the Scottish Social
Housing Charter and relevant Council Plan priorities. Collectively these three documents emphasise the importance of supporting our communities’
tenants and residents to grow and develop opportunities for active engagement and participation for all citizens by listening to local needs and
aspirations. 
156

Page 157

Appendix 2 
Alongside developing the Customer Participation Strategy for 2023 – 2028 we received gold level accreditation from Tenant Information Service (TIS
Scotland) in August 2022 for Excellence in Scrutiny and Charter Performance for 2023 –2025.  In addition, we received gold level re-accreditation
from Tenant Participation Advisory Service (TPAS Scotland) in November 2022 for Excellence in Tenant Participation for 2023 - 2025. 
Our latest tenant satisfaction survey told us that 92% of tenants are satisfied with the opportunities given to them to participate in our decision-making
processes. 
Standard 2 – Housing quality and maintenance 
Outcomes: 
Quality of housing 
Our housing stock is in very good condition and is well maintained. We take a proactive approach to housing asset management and target
improvements to ensure that our properties are SHQS and EESSH compliant. Properties are refurbished to ensure they remain attractive, meet
energy efficiency targets, meet modern requirements, and tenant expectations. We have a range of planned maintenance programmes which are
designed to: optimise investment by replacing major element components before they would otherwise require responsive repairs; anticipate changes
in minimum acceptable standards; reduce future requirements for cyclical maintenance; and future proof properties to ensure sustainability measures
being introduced can be met.   
A self-assessment of asset management processes and data has been undertaken to develop our approach. This is to enable the delivery of the
Housing Asset Management Plan (HAMP) and takes cognisance of the recommended practice on Integrated Asset Management published by the
Scottish Housing Regulator (SHR) in February 2023. The workstream is reported to the Housing Asset Management Board and has an action plan
developed and monitored to ensure delivery. Alongside property lifecycle data, the outcomes from the action plan will inform future capital investment
needs and identify properties where investment required is not economically viable and other solutions may be preferable, such as demolition.  
We have not met our legal obligations around tenant and resident safety during 2023/24 as we did not comply with gas safety legislation for 25
properties.  Due to new legislation introduced during 2021/22 regarding the frequency of electrical testing and the installation of smoke detection
equipment, 2,821 properties were non-compliant with regards to having an up to date EICR during 2023/24.  There continues to be an ongoing
reluctance by some tenants to grant access to their property; this is an issue we are working to address alongside system issues.  Additional contracts
were put in place to try and achieve this by the date given, however supply chain and labour shortages for contractors have also impacted the
programme.  In early 2023, a cross-service working group was established to address our performance in this area. An improvement plan was
developed and implemented which has delivered a sustained increase in performance from 2022/23. As part of our improvement plan, a dedicated
Compliance Team within PMI has been created, supported by additional resources. We aim to be 100% compliant and efforts continue to close the
157

Page 158

Appendix 2 
remaining gap. However, completing the EICR programme in the context of continuing tenant refusal makes this extremely challenging. Resorting to
forcing access using our Access Policy is also extremely resource intensive for both the Council and our contractors. 
We have a dedicated Contracts, Compliance and Maintenance team within our Property Management and Investment service who ensure all statutory
compliance requirements are met with regards to lift maintenance and legionella.  We also have a dedicated asbestos compliance officer who works
with all officers conducting any form of refurbishment or alteration to buildings to ensure compliance with legislation in all instances.   
Condensation, Dampness & Mould
North Ayrshire Council has a robust approach to dealing with cases where dampness and mould are reported. A strategy - which encompasses our
approach to both Council homes and the private sector - and an improved proactive “end to end” process is in place.
A comprehensive process map has been developed that sets out the process and ensures issues with damp and mould are effectively addressed.
The core of this process is in place and further elements, such as an expansion in the use of electronic monitoring, are also under consideration. 
Our Building Services Inspection Officers, who inspect instances of dampness and mould, are all from a building trade background and are qualified
to HNC in Construction standard as a minimum. Further specialist training in dampness, mould, and timber decay has been undertaken by two
officers who have achieved the industry recognised qualification of Certificated Surveyor of Timber and Dampness in Buildings (CSTDB).
Tenant engagement has also been increased, with regular information provided via the digital Tenant Chat channel.
Repairs, maintenance and improvements 
North Ayrshire Council is committed to delivering a high quality, efficient and effective reactive and planned maintenance service to all our tenants and
factored owners in a manner which maintains high customer satisfaction.  Our Repairs Policy sets out the service provided by the Council for repairs
and maintenance and aims to ensure the needs of our current and future tenants are met in relation to the provision of high-quality housing. The
policy is currently under review as part of the Housing Transformation Board workstream and will be developed in consultation with tenant
representatives. 
The average length of time taken to complete emergency repairs decreased from 2.64 in 2022/23 to 2.12 hours in 2023/24, and from 8.42 to 7.60
days for non-emergency repairs. The increase in performance is due to the introduction of a new ‘Handyman’ post which allow Building Services to
complete a higher volume of routine multi-trade jobs and allow more time for qualified operatives to undertake more complex, trade specific works.
The move to this planned approach to works has improved the average response times for both emergency and non-emergency repairs.  We continue
to remain within our four-hour target for emergencies as per our housing repairs policy. 
158

Page 159

Appendix 2 
Satisfaction levels of tenants who had repairs or maintenance carried out in the last 12 months increased from 86.16% to 97.51% during the same
period.  This is based on responses from 1,564 tenants received during 2023/24.   
An efficient and effective void repairs service provides a quick turnaround on empty properties, which helps to accelerate the repairs process and
reduce void rent loss.  Void performance is affected by the additional time taken to rehouse tenants affected by our regeneration projects. A general
increase in the number of properties requiring major works such as central heating, rewiring and full decoration has also impacted on performance. 
The average time taken to re-let properties has increased slightly from 23.99 days in 2022/23 to 26.86 days in 2023/24.  For 2023/24 void performance
was also affected due to issues with utility meters, which is recognised nationally as a significant issue and has been escalated to the Scottish
Government for action.  Housing Services are working with Building Services to review the current void process as part of the Housing Transformation
Board workstream to ensure the delivery of an effective and efficient service for tenants and to assist in future proofing our housing stock. Despite the
slight increase in the number of days taken to re-let voids we are still ranked first within our SHN benchmarking peer group for 2023/24 and second
across all other local authorities. 
Standard 3 – Neighbourhood and community 
Outcome: 
Estate management, antisocial behaviour, neighbour nuisance and tenancy disputes 
Estate Management covers a broad range of situations and activities such as new tenant visits, permissions for garages and driveways in garden
ground, abandoned tenancies, untidy gardens, neighbour disputes, problems with pets, abandoned vehicles, tackling graffiti and illegal dumping/fly-
tipping.  We have a comprehensive Estate Management procedure manual to ensure we meet our responsibilities as a landlord, and to support
tenants to meet their responsibilities as detailed within their Tenancy Agreement. Every effort is made to support tenants to address any breach of the
tenancy agreement, however if a tenant is consistently unwilling to do adhere to the tenancy agreement, the Council will pursue appropriate and
proportionate action.   
In May 2024 a new integrated delivery model was implemented with housing, homelessness, advice, support and anti-social behaviour officers located
within locality-based housing offices.  Teams are working to identify the service priorities within each town to ensure there is a joined-up response to
delivering an improved service to our tenants and residents by resolving any issues as they arise at local level. 
During 2023/24 the remit of the Estate Caretaker post was reviewed and evaluated which resulted in the regrading and redesignation of the post to
become an Estate Officer.  The remit is to provide a more proactive rather than reactive service for our tenants and residents. 
The Safer North Ayrshire Partnership (SNAP) is a multi-agency group who work together with local communities and key stakeholders to prevent
crime and antisocial behaviour, responding quickly and proportionately to arising issues. 
159

Page 160

Appendix 2 
We experienced a 1.5% decrease in reports of ASB during 2023/24 compared to the previous year. The Council has locally agreed targets for the
closure of ASB cases, which are based on the complexity and level of investigation required to resolve them.  Our performance against the locally
agreed targets during 2023/24 was 100% of cases resolved within agreed timescales, against a target of 94%. 
Our last tenant satisfaction survey was carried out during 2021, therefore there has been no change to the satisfaction levels reported in the previous
AAS which detailed a decrease of 12% in tenants satisfied with the management of the neighbourhood they live in compared to the previous survey
carried out in 2018. 
Standard 4 – Access to housing and support 
Outcomes: 
Housing options and access to social housing
We, alongside our RSL partners, are currently reviewing our Housing Allocation Policy with implementation expected during 2025.  This review is
looking at key themes that have emerged from our last review in 2019 and any upcoming legislation that could impact housing allocations.  We
introduced an Arran Local Letting Initiative in April 2021, which allows island residents and key/ essential workers to be given additional priority for
housing on the Island. Trust Housing Association will be joining the North Ayrshire Housing Register (NAHR) during 2024/25 and will adopt the Arran
Local Letting Initiative. 
In relation to our void processes, timescales are mutually agreed by the Housing Officer and Building Services supervisor, based on the amount of
work required. Although the average time taken to re-let properties increased slightly from 23.99 days in 2022/23 to 26.86 days in 2023/24.  For
2023/24 void performance was also affected due to issues with utility meters, which is recognised nationally as a significant issue and has been
escalated to the Scottish Government for action.  We have established a cross-service working group to review and analyse our void processes. The
group will scrutinise current working practices to identify opportunities to improve our void processes, turnover performance and to create efficiencies. 
Housing management and our Building Services team (who carry out the majority of works in Council dwellings) have periodic meetings with officers
from North Ayrshire Health and Social Care Partnership (NAHSCP) who – in accordance with the Integration Scheme - manage the process for aids
and adaptations.  This allows us to understand demand and agree, set, and monitor performance in relation to expenditure.  NAHSCP have a formal
Adaptations Criteria and Policy for staff to adhere to; this ensures a consistent and high-quality adaptations assessment process. Joint complex case
reviews are held monthly between NAHSCP and Housing professionals to agree the scope of the works to be undertaken. OT staff have been trained
to explore the housing options of housing applicants with long term health conditions, to ensure that accessible housing needs are met where
adaptations are not appropriate. These tiers of governance provide a formal procedure for all decision making, ensuring resources are targeted to
those most in need of adaptations.   
160

Page 161

Appendix 2 
There has been a decrease in the number of households waiting for an adaptation to their home, decreasing from 465 in 2022/23 to 302 in 2023/24. 
The average number of days to complete an approved adaptation has also decreased from 92.40 to 90.59 days.  The joint improvement group
comprising of Housing Services, Building Services, Property Management and Investment and the Health and Social Care Partnership continue to
review demand and current work processes, in order to deliver the best outcome and value for money for tenants. 
Homeless people 
Approaches for homeless assistance 
Approaches for homeless assistance in North Ayrshire increased by 6% during 2023/24 compared to the previous year, resulting in rising pressure
on the demand for temporary accommodation.  The annual national performance statistics published by the Scottish Government has reported that
homelessness is at the highest level since 2011/12, with the number of open homelessness applications and households in temporary accommodation
reaching the highest in the time series (back to 2003 and 2002 respectively).. 
Whilst there is increasing pressure on the housing system locally in North Ayrshire, a range of measures are in hand to respond to this, including
increasing housing supply, ensuring our empty properties are turned around as quickly as possible for re-let, and managing the demand from homeless
people by way of temporary and the supply of permanent accommodation. We have changed the service delivery model within Housing/Homelessness
services to enable prevention activities to be undertaken at a locality level with newly integrated teams working to identify the service priorities within
each locality. The Homelessness Task Force that we have in place comprises of a range of stakeholders who are working to analyse the variety of
datasets we have at our disposal.  The purpose of this is to understand the changing dynamics of the homelessness system and risk factors.  The
work of the task force includes preparation of a new Prevention Strategy, which will consider all of the levers at our disposal to balance the system
and will also be aligned to the new Housing (Scotland) Bill 2024. In addition, a key component of our current allocations policy review is to understand
the impact of increased lets to homeless households and the options available for mitigation.  
Reasons for approach for homeless assistance
The main reason for homelessness in North Ayrshire during 2023/24 was as a result of a relationship breakdown, accounting for 254 approaches
(21.78%); this is followed by people being asked to leave the family home, which accounted for 219 (18.78%) approaches. 
Applications from households fleeing domestic abuse accounts for 168 homeless approaches (14.4%) during 2023/24, compared to 152 approaches
(14%) in 2022/23. 
We have had no breaches of the Unsuitable Accommodation Order and have ensured that temporary accommodation continues to be available for
anyone who needs it.  We have continued the delivery of the Rapid Rehousing Transition Plan (RRTP) and met the year five target to deliver 100
Housing First tenancies for the most vulnerable homeless households in North Ayrshire by 31 March 2024.
161

Page 162

Appendix 2 
The North Ayrshire Homelessness Task Force has reviewed the above performance to inform our homeless prevention strategy moving forward. 
Standard 5 – Getting good value from rents and service charges  
Outcomes: 
Value for money
Our robust Housing Revenue Account Business Plan provides clear strategic direction, ensuring that effective short, medium, and long-term financial
planning is undertaken.  This clearly details how we will plan for, and deliver, key priorities such as compliance with the Scottish Housing Quality
Standard, investment in our current stock, our Council house building programme and rent setting. 
The Business Plan was developed by a cross stakeholder working group which included representation from elected members, tenant representatives
and officers from within Housing, Property Management and Investment, Building Services and Finance.  This approach ensured balanced decision-
making that can stand up to both internal and external scrutiny. 
In addition to the business plan, we have an effective budget and performance management reporting framework that makes certain that we continue
to provide value for money services to our tenants and, at the same time, keep rents at affordable levels.  This is achieved while recognising that we
are currently operating within an extremely challenging and evolving economic environment which requires sufficient flexibility to be able to change
and adapt investment plans. 
The Business Plan is easily accessible to stakeholders.  It provides information to demonstrate that the Council has a clear picture of its strategic
direction and the associated financial position of the service to deliver this, over the 30-year planning period.  This plan is reviewed annually, and we
are focused on providing value for money through a number of measures, such as operating robust financial management processes, implementing
value for money principles, exploring efficiency opportunities, and managing competitive contractual arrangements.   
During our last tenant satisfaction survey 89.47% of tenants confirmed they felt that the rent for their property represents good value for money. 
Rents and service charges
Our rent levels remain in line with the national average, whilst continuing to invest in our existing stock and new house building programme. Our
plans takes account of the strategic context, such as: the prevailing economic situation and expectations/ forecasts for the time horizon of the
business plan; the broader context for tenants and other service users such as rent affordability, cost of living, welfare policy and how the labour
market is performing; and the broader context for landlords such as cost pressures in repairs, maintenance and development, supply chain issues,
162

Page 163

Appendix 2 
investment decisions in meeting net zero obligations and tackling homelessness.  We manage these pressures and are committed to delivering
services in new, improved and more cost-effective ways. 
Standard 6 – Other customers  
Outcomes: 
Gypsy/travellers
North Ayrshire Council provides services, advice and assistance to Gypsy/Travellers who live permanently in North Ayrshire and to those who visit
on a temporary basis.  North Ayrshire manages one permanent site at Redburn Grove, Irvine.  The site has 16 pitches, and each pitch has its own
amenity block with separate kitchen, shower, toilet facilities and utility room.  A community room is available on site for partner services to meet
tenants and their children within a safe and comfortable environment.  The room is used by several services, including Education, the Welfare Reform
Advice team, Tenancy Support, the Community Link team, and a regular GP surgery.  Our Tenant Participation Team also support Redburn Grove
tenants to hold regular tenants’ meetings. The meetings allow tenants the opportunity to work in partnership with Council staff as we consider the
options for current and future service provision. 
In 2016 the Scottish Government introduced minimum standards for Gypsy Traveller Sites across Scotland.  North Ayrshire Council achieved the
minimum standards at Redburn Grove; however, we recognise that significant capital investment is required to ensure that it continues to meet
expected standards. Following consultation with current tenants in April 2023, future improvement proposals for the Redburn site are being developed
reflecting on feedback gathered in relation to their preferences for future housing. 
The Scottish Government has developed a draft design guide for Gypsy/Traveller sites to be used for new sites or major refurbishments of existing
sites.  The design guide has been provided to give advice on what good quality, culturally appropriate accommodation should look like.  The Scottish
Government previously had a capital fund available for five years from 2021-25 with criteria clearly outlined for the fund, including how residents and
travelling community members would be involved, together with a process for project selection. However, this was put on hold due to funding
constraints. During August 2024 the Scottish Government wrote to all local authorities to advise them that the fund will be reintroduced from 2026-27
onwards. The Scottish Government will work with CoSLA and relevant colleagues to ascertain how the fund will be utilised using the information
gathered from the demonstration projects completed through the previous fund. 
Our response to unauthorised encampments fully complies with Scottish Government policy.  Our Gypsy/Traveller Encampment Officer works to build
relationships with visiting families to assess their needs.  Where necessary they make referrals to partner organisations and provide advice on housing
options, if required. The Officer also works closely with other landowners and members of the settled community and provides advice and assistance
regarding the rights and responsibilities of Gypsy/Travellers who visit North Ayrshire. 
163

Page 164

Appendix 2 
Refugees
North Ayrshire Council is fully committed to supporting the UK Humanitarian programmes in place to accommodate and support refugees. This work
is coordinated by our inter-agency Refugee Task Force comprising of senior officers from across the Community Planning Partnership (CPP) including
Housing, the Health and Social Care Partnership, Education, Department of Work and Pensions, Police Scotland, and voluntary organisations. 
Our Refugee Support Team work together with the CPP partners to deliver robust resettlement support to assist families to integrate into the local
communities and access vital services to meet their individual needs. 
During 2023/24, the Council and community planning partners have supported 145 Ukrainian households, comprising of 347 individuals, to resettle
in North Ayrshire across the different Scottish Government sponsorship schemes. To support the schemes, 33 properties were bought during 2023/24
using our buy back approach and allocated to Ukrainian households. 
We have provided 120 units of social housing stock to provide long term accommodation for households. We previously supported a Welcome Hub
which was set up within a local hotel to provide interim emergency accommodation and support to a number of individuals and families while they
awaited a more appropriate housing solution. The transition of all guests to permanent housing was successfully completed by September 2023. 
In the last 12 months, in partnership with the Scottish Government, we have redeveloped a large vacant property to provide temporary accommodation
for a further three Ukrainian families. We have also purchased 33 ex-local authority properties throughout North Ayrshire to support the Ukrainian
resettlement programme. The 33 properties were fully funded by the Scottish Government with the condition that they are utilised for Ukrainian
Displaced Persons (UKDPs) for the first three years.  Thereafter, they can be utilised for mainstream housing allocations. 
Housing Services are monitoring resettlement provision carefully to ensure we continue to meet our statutory responsibilities in relation to other priority
groups including homeless people. 
164

Page 165

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee 
Title:    National Fraud Initiative (NFI) in Scotland 2024 
Purpose:  To provide the Committee with an overview of the NFI 2022/23
exercise outcomes. 
Recommendation:  That the Committee notes the outcomes of the exercise. 
1. Executive Summary 
1.1 Audit Scotland has published its most recent biennial National Fraud Initiative (NFI)
report. The report is provided in full at Appendix 1. 
1.2 North Ayrshire Council’s participation in the NFI exercise is coordinated by the
Corporate Fraud Team, with matches investigated by appropriate teams across the
Council. 
1.3 Investigation of the 2022/23 data matches was concluded earlier in 2024. 
2. Background 
2.1 The NFI is a major counter fraud exercise carried out across the UK every two years.
Participating bodies provide sets of data and, following matching of data provided by
various public sector bodies, anomalies in the data are provided for investigation. 
2.2  The exercise is coordinated across the UK by the Cabinet Office, and in Scotland is
delegated to Audit Scotland through the powers in the Criminal Justice and Licensing
(Scotland) Act 2010 and incorporated in Part 2A of the Public Finance and
Accountability (Scotland) Act 2000. 
2.3  The NFI exercise in Scotland is well established and remains the most comprehensive
detective and preventative scheme in which vast amounts of data across numerous
public bodies can be compared and matched using dedicated software. A data match
does not necessarily mean there is fraud or error present, but highlights that further
investigation is required in order to make a determination. Outcomes are recorded on
the system and collated for each public body in order to arrive at a total value of
recoveries across the whole of Scotland. 
2.4  110 public bodies across Scotland participated in the 2022/23 NFI exercise, and
matches are recommended for investigation across the country. Most matches are
Agenda Item 9
165

Page 166

OFFICIAL INFORMATION
OFFICIAL INFORMATION
categorised into risk priority to enable resources to be focussed on the matches with the
most likely outcomes and recoveries. 
2.5  The value of fraud and error identified across Scotland in 2022/23 was £21.5m, resulting
in cumulative outcomes of £180m since the NFI first launched in 2006/07. 
2.6 The majority of the NFI results arise from the following key match areas:
• Payroll
• Council tax discounts
• Blue badges
• Pensions
• Housing benefit
• Housing tenancy
• Council tax reduction
• Housing waiting lists
• Creditors 
2.7 Whilst the national report does not include the outcomes of each individual body
included in the exercise, consultation with Audit Scotland confirmed that for North
Ayrshire Council NFI outcomes totalled £0.474m.  It should be noted however that this
includes a notional saving of £0.342m relating to 526 Blue Badge matches, where the
badge holder has been identified as deceased.  These badges have since been
cancelled. 
2.8 External audit also carried out an assessment of the Council’s planning and progress
with the NFI and makes recommendations for improvement where appropriate. North
Ayrshire Council was assessed as Satisfactory. 
2.9 Audit Scotland continues to work with the Cabinet Office in developing new ways to
prevent and detect fraud. This includes piloting new data matching opportunities, and
where pilots achieve matches that demonstrate a significant level of success these are
extended nationally and included in the main NFI exercise going forward. 
3. Proposals 
3.1 It is proposed that the Committee notes the content of the Audit Scotland report on the
National Fraud Initiative in Scotland 2024. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
166

Page 167

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of the Corporate Fraud Team, including participation in the NFI, helps to
support the efficient delivery of the strategic priorities within the Council Plan 2023-
2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation has been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk and Insurance, on 01294 324607. 
Background Papers
None. 
167

Page 168

Prepared by Audit Scotland
August 2024
The National Fraud
Initiative in
Scotland 2024
168

Page 169

2The National Fraud Initiative in Scotland 2024
Contents
Key messages 3
Recommendations 4
1. Introduction 5
2. Overall outcomes  7
3. NFI delivery 11
4. Specific match areas 14
5. Pilot exercises and future developments 25
Appendix 26
Accessibility
You can find out more and read this report using assistive
technology on our website www.audit.scot/accessibility.
Audit team
The core audit team
consisted of: 
Tim Bridle, under the
direction of Cornilius
Chikwama.
169

Page 170

3Key messages
Key messages
Key messages
Key messages
1 Fraud against the public sector costs the taxpayer money and
can undermine both confidence in government and the delivery
of public services. The proactive detection and prevention of
fraud using the National Fraud Initiative (NFI) remains vitally
important to public sector financial management as public bodies
continue to recover from Covid-19 and to deal with the impact of
the cost-of-living crisis.
2 NFI savings and outcomes have increased from £14.9 million
in 2020/21 to £21.5 million in 2022/23, with increases across
most data match areas. However, savings from council tax single
person discounts are slightly reduced and additional outcomes
in some areas are attributable to changes in estimation
methodologies. Overall, it is not clear whether underlying levels
of fraud have increased since 2020/21.
3 NFI governance and follow-up arrangements remained sound
for most participating bodies over the period covered by the
2022/23 exercise. However, when compared to previous
exercises, fewer bodies have been assessed by their auditors as
having fully satisfactory arrangements, and there remains scope
for some bodies to follow up on data matches more effectively.
170

Page 171

4Recommendations
Recommendations
Participating bodies should:
• Ensure that an appropriate level of resource is available to deliver NFI
follow-up activities in an efficient and effective manner, in line with
local priorities.
• Use the NFI Self-Appraisal Checklist as part of planning for the 2024/25
exercise.
• Put in place arrangements for monitoring follow-up activity, and where
it is necessary seek to understand reasons for low or nil outcomes.
171

Page 172

5
1.
1. Introduction
1. Introduction
The proactive detection and prevention of fraud using the
National Fraud Initiative (NFI) remains vitally important to
public sector financial management as public bodies
continue to recover from the Covid-19 pandemic and to deal
with the impact of the cost-of-living crisis.
1. Fraud against the public sector costs the taxpayer and can undermine
both confidence in government and the delivery of public services.
The National Fraud Initiative (NFI) is a proactive data matching exercise
designed to identify and prevent fraud. It remains vitally important during
a time of ongoing financial pressure as public bodies continue to recover
from the Covid-19 pandemic and to deal with the impact of the cost-of-
living crisis.
2. The Public Sector Fraud Authority (PSFA) oversees the NFI across
the UK, and Audit Scotland leads the exercise in Scotland, working with a
range of Scottish public bodies and their external auditors. The NFI takes
place every two years, and this report considers the outcomes from the
2022/23 exercise.
Statutory basis for NFI
3. We carry out the NFI under powers introduced by the Criminal
Justice and Licensing (Scotland) Act 2010 and incorporated in Part 2A
of the Public Finance and Accountability (Scotland) Act 2000. It is
important for all parties involved that this exercise is properly controlled,
and that data is handled in accordance with the law. The Audit Scotland
Code of Data Matching Practice includes a summary of the key
legislation and controls governing the NFI data matching exercise.
Participating bodies
4. In 2022/23, 110 public sector bodies in Scotland participated in
the NFI, submitting data and following up on matches. The Scottish
Government also submitted data for another 17 central government
bodies who share their systems for payroll and/or creditors. Many
councils also submit payroll data for their Arm’s-Length External
Organisations (ALEOs). Across the UK there are over 1,100 participating
bodies and data matching takes place across them all.
172

Page 173

1. Introduction 6
Main data match areas in 2022/23
5. The main data match areas for the 2022/23 NFI exercise were:
• Payroll
• Creditor payments
• Council Tax (Single Person Discounts and Reduction Scheme
reliefs)
• Pensions
• Housing Benefit
• Housing Tenancy and waiting lists
• Blue Badges (disabled parking)
• Adult concessionary bus travel (new in 2022/23 exercise).
6. The 2022/23 NFI exercise matched new data from His Majesty’s
Revenue and Customs (HMRC) using powers under the Digital Economy
Act (2017).
7. Non-Domestic Rates Small Business Bonus Scheme (NDR SBBS)
matching was postponed for the 2022/23 exercise due to the national
NDR revaluation exercise in 2023. Results will be reported as part of the
2024/25 exercise.
Basis for reported outcomes
8. All monetary outcomes included in this report are on a cash basis,
prior year totals have not been adjusted to reflect inflation or changes in
estimation methodologies since amounts were originally reported. Details
of estimate methodologies used can be found at Appendix.
173

Page 174

72. Overall outcomes
2. Overall outcomes
Overall outcomes from the NFI have increased from 
£14.9 million in 2020/21 to £21.5 million in 2022/23.
Overall outcomes by type
9. The value of outcomes from the NFI, recorded since our last report,
total £21.5 million (up from the £14.9 million in 2022). The cumulative
value of outcomes from the NFI in Scotland since participation started
in 2006/07 now stands at around £180 million. Exhibit 1 shows NFI
outcomes by type for 2022/23 and the previous three exercises.
Exhibit 1. 
NFI outcomes by exercise and type, 2016/17 to 2022/23
Reported outcomes have increased to £21.5 million in 2022/23.
Source: Audit Scotland analysis of NFI outcomes
0
10
25
2022/232020/212018/192016/17
£ million
£17.8m 
£15.3m  £14.9m 
£21.5m
3.1
2.7 4.2
6.8
9.2 7.0
6.2
8.9
5.5 5.6 4.5 5.7
Actual savings:
overpayments and
additional income
Forward savings
estimates: from
overpayments,
additional income and
prevented fraud
Notional outcome
estimates: not directly
linked to actual
overpayments or
additional income, eg
blue badges, housing
tenancy and waiting lists
10. Increased outcomes reported in 2022/23 partly reflect improvement
in recording of results as bodies continue to recover from Covid-19. There
have also been changes to estimation methodologies which contribute to
higher outcomes in some areas (details of methodologies can be found
in the Appendix). It is not possible to extrapolate from these figures that
underlying levels of fraud have increased.
174

Page 175

2. Overall outcomes 8
Outcomes by data match area
11. Most monetary outcomes from the NFI accrue to councils, the Scottish
Public Pensions Agency and the Department for Work and Pensions (DWP)
in the form of savings arising from council tax, pensions and housing
benefits matches.
12. Many participating bodies only submit payroll and creditors datasets
for matching, and this limits the monetary outcomes available to them.
However, overpayments associated with duplicate creditor payments and
payroll matches are not insignificant. NFI outcomes analysed by main data
match area, are shown for the last three exercises in Exhibit 2 (page 9).
175

Page 176

2. Overall outcomes 9
Exhibit 2. 
NFI outcomes by area and exercise
Most savings arise from Council Tax, Pensions and Housing Benefits matches.
Notional outcome
estimates
Forward savings
estimates
Overpayments and
additional income
£ Million
0 1 2 3 4 5 6
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
Care Home Payments
Payroll
Concessionary Bus Travel
Creditors
Housing waiting lists
Council Tax Reduction Scheme
Housing Tenancy
Housing Benefit
Pensions
Non-Domestic Rates
Blue Badges
Council Tax SPD
£ million
2020/21
2018/19
2022/23
176

Page 177

2. Overall outcomes 10
Notes:
1.  Non-Domestic Rates Small Business Bonus Scheme data was first submitted for the 2020/21
exercise but did not form part of the 2022/23 exercise due to the revaluation exercise taking place
in 2023.
2.  Care home payments have not been matched since 2018/19 due to legislative constraints.
3.  Adult concessionary bus travel was a pilot exercise in 2020/21 and has been mainstreamed in
2022/23.
Source: Audit Scotland analysis of NFI outcomes
Wider benefits of NFI
13. The NFI also delivers benefits which are more difficult to quantify.
These include its fraud deterrent effect and the financial governance
assurance it provides to bodies where no issues are identified (Exhibit 3).
Exhibit 3. 
Non-monetary benefits of NFI
Source: Audit Scotland
Acts as a deterrent to 
potential fraudsters
Can provide assurance that
systems are operating well
Can identify where system
improvements are required
177

Page 178

113. NFI delivery
3. NFI delivery
NFI governance and follow-up arrangements remain sound
for most participating bodies. However, when compared to
previous exercises, appointed auditors assessed fewer
bodies as having fully satisfactory arrangements.
Auditor assessments
14. NFI governance and follow-up arrangements remain sound for most
of the 110 bodies in Scotland that participated in the 2022/23 exercise.
However, several bodies have struggled with delivery and there remains
some scope for improvement.
15. We asked auditors to assess participating body NFI arrangements,
and rate them as Green (satisfactory), Amber (mostly adequate) or
Red (unsatisfactory). Auditor returns for 2022/23 included an increased
number of amber and red ratings Exhibit 4 (page 12).
16. In most cases amber or red assessments reflect deficiencies with
follow-up activity. Participating bodies routinely cited the lack of 
adequate resources as the main reason for delay or lack of progress 
with follow-up activity.
17. Our NFI Self-Appraisal Checklist includes requirements for
participating bodies to consider Leadership, Commitment and
Communication. The checklist also asks NFI key contacts and users
to consider potential improvements to the efficiency and effectiveness
of follow-up activity. The checklist can be found on our Counter Fraud
webpage and has been updated for the 2024/25 exercise.
178

Page 179

3. NFI delivery 12
Exhibit 4. 
Auditor assessments of NFI delivery arrangements
More bodies received amber and red assessments in 2022/23.
Source: Audit Scotland analysis of Auditor Returns
Percentage
Satisfactory
Mostly adequate
Unsatisfactory
0 10 20 30 40 50 60 70 80 90 100
Colleges 2022/23
Colleges 2020/21
Colleges 2018/19
CG 2022/23
CG 2020/21
CG 2018/19
NHS 2022/23
NHS 2020/21
NHS 2018/19
LG 2022/23
LG 2020/21
LG 2018/19
179

Page 180

3. NFI delivery 13
18. Exhibit 5 shows the main determinants of successful NFI delivery that
participating bodies should be focusing on to strengthen their arrangements.
Exhibit 5. 
NFI participation – main determinants of success
Successful delivery of NFI requires a clear commitment to a well-thought-out
approach that optimises the use of available resources to follow up matches
appropriately.
Source: Audit Scotland
19. Audit Scotland will continue to work with bodies to support effective
and efficient delivery of NFI through its ongoing engagement activities.
Knowledge Resources
Leadership
Effective
NFI delivery
180

Page 181

144. Specific match areas
4. Specific match areas
NFI outcomes have increased in most data match areas in
2022/23. However, savings from council tax single person
discounts decreased slightly, and increases in some areas
are partly due to changes in estimation methodologies.
Payroll
20. The number of payroll and multi-contract working frauds identified
as a result of the NFI has increased. There were 12 cases identified in
2022/23. This is the highest number since 2016/17, which is the last
exercise for which immigration data was matched. Overpayments and
case numbers for the 2022/23 exercise are shown alongside those for
the three previous exercises at Exhibit 6.
Exhibit 6. 
Payroll outcomes and case numbers by NFI exercise
There has been an increase in the level of identified fraud in 2022/23.
Note. Notional outcomes of £5,685 per case are allocated where staff resign or have been 
dismissed (Appendix).
Source: NFI management information
0
80
140
2022/232020/212018/192016/17
0
8
16
24
2022/232020/212018/192016/17
Number of cases
Overpayments
£ thousand
Cases
13
8
3
12
£20,000
£129,000
£27,000
£100,000
Notional outcomes
181

Page 182

4. Specific match areas 15
Creditor payments
21. Participating bodies submit details of payments made to people or
organisations supplying them with goods and services. Data is matched
by the NFI to identify potential duplicate payments. Bodies identifying
duplicate payments often refresh procedures and tighten controls to
reduce future risk.
22. In 2022/23 outcomes worth £0.75 million were identified from 146
duplicate payments across 31 bodies. This is broadly in line with previous
exercises as shown in Exhibit 7.
Exhibit 7. 
Duplicate creditor payment savings and case numbers by NFI exercise
£0.75 million of recoverable duplicate creditor payments was identified in 2022/23.
Source: NFI management information
0
0.6
1.2
2022/232020/212018/192016/17
Number of duplicate
payments
Overpayments
£ million
168
147 144 146
£0.6m
£1.1m
£0.5m
£0.75m
130
150
170
2022/232020/212018/192016/17
182

Page 183

4. Specific match areas 16
Adult Concessionary Bus Travel
23. Following a successful pilot exercise in 2020/21, adult concessionary
bus travel mortality screening was rolled out to councils in 2023. The
National Entitlement Card Project Office, working in partnership with
councils, submitted details of all live travel passes for matching.
24. The NFI identified 99,600 travel passes that belonged to holders who
had died. Transport Scotland was able to check usage of these passes
and identified that 1,075 had been used after the date of death.
25. The full fare value of fraudulent bus trips associated with these
passes amounted to £0.31 million, with a cost to Transport Scotland of 
around £0.18 million, based on the applicable reimbursement rates to 
bus companies.
26. The cancellation of these passes will prevent future fraudulent use
with an estimated value of £0.45 million (based on £420 per travel pass
used fraudulently, see Appendix (page 26). The resultant saving to
Transport Scotland is estimated at around £0.25 million based on current
reimbursement rates.1
Council Tax Single Person Discounts
27. People living on their own, or in some cases with adults who can
be ‘disregarded’, are eligible for a 25 per cent single person discount
(SPD) on their annual council tax bill. The NFI matches SPD recipients to
the electoral register and to other datasets to identify where other adult
residents have not been declared on applications, have subsequently
turned 18 or have moved in.
28. Councils withdrew £1.8 million worth of SPDs because of the NFI.
The additional income, based on a forward projection of annual savings
for two years, in line with the Cabinet Office methodology, equates to an
additional £2.7 million. These amounts are shown together and alongside
savings for the previous three exercises in Exhibit 8 (page 17).
29. Only 19 councils recorded NFI activity in relation to SPDs, as more
councils are now making use of third party providers for data matching
and follow-up. Seven councils using third-party providers now record no
NFI outcomes (an increase of two from the previous exercise).
1   Total outcomes for this area (Exhibit 2) includes a notional amount
of £0.91 million relating to the pilot exercise in 2020/21 (based on the
Cabinet Office methodology at the time which applied £550 to each
travel pass cancelled).
183

Page 184

4. Specific match areas 17
Exhibit 8. 
Council Tax SPD savings and case numbers by NFI exercise
Case numbers and savings from single person discounts decreased in 2022/23.
Source: NFI management information
Thousand
4,846 4,588
3,720 3,419
1.8
2.6 2.7
Case numbers0
3
6
2022/232020/21 2018/19 2016/17 
0
3
6
2022/232020/212018/192016/17
£4.4m 
£4.9m 
£4.6m  £4.5m
3.1
1.8
2.8
1.5
2.9
1.7
2.7
1.8
Forward savings estimate
Discounts removed
£ million
Council Tax Reduction Scheme (CTRS)
30. Council tax reduction is available to low-income households in
Scotland. The NFI matches CTRS data to other datasets, such as payroll
and pensions, for example, to identify undeclared income.
31. In 2022/23, additional council tax income of £0.92 million was
identified because of follow-up on NFI matches (up from £0.65 million
in 2020/21). Savings and case numbers are shown alongside those from
the previous three NFI exercises in Exhibit 9 (page 18).
184

Page 185

4. Specific match areas 18
32. Actual additional income from the removal of council tax reductions
has increased, as have forward savings estimates. The forward savings
estimate methodology has, however, changed with savings now based
on 33 weeks, compared to the 21 weeks previously used.
Exhibit 9. 
Council Tax Reduction Scheme savings and case numbers by NFI exercise
Total potential savings from CTRS have increased to £0.92 million in 2022/23.
Source: NFI management information
115
280
772
395
Case numbers0
400
800
2022/23 2020/212018/192016/17
395
772
280
115
2022/23
2020/21
2018/19
2016/17
0.0
0.5
1.0
2022/232020/212018/192016/17
£0.48m 
£0.30m 
£0.65m 
£0.92m
0.08
0.23
0.09
0.38
0.12
0.53
0.23
0.69
Forward savings estimate
Reductions removed
£ million
33. Only 18 councils identified savings from CTRS, with most savings
arising from matches to pensions (around 40 per cent) and payroll (around
30 per cent), where income had not been declared.
185

Page 186

4. Specific match areas 19
Housing Benefits
34. Housing benefits (HB) help people on low incomes pay their rent.
HBs in payment continues to decrease as more benefit recipients move
on to universal credit.
35. The DWP’s Verify Earnings and Pensions alerts service has also
impacted HB savings from NFI as alerts are sent directly to councils for
investigation, allowing them to follow up outside the NFI process. We no
longer match HB to payroll and pension as part of the NFI.
36. There has, however, been an increase in reported savings in
2022/23 due to the inclusion of late DWP savings from the 2020/21
exercise which was affected by Covid-19. Exhibit 10 shows the HB
overpayments and forward savings reported for the current and previous
three NFI exercises.
Exhibit 10. 
Housing Benefit savings by NFI exercise
2022/23 includes significant late DWP savings from the 2020/21 exercise.
Source: NFI management information
0.0
1.5
3.0
2022/232020/212018/192016/17
£2.1m
£2.8m 
£1.2m
£2.2m
2.1
0.7
1.4
0.7
0.3
0.9
0.4
1.8
Forward savings estimate
Overpayments
£ million
37. HB matches involving suspected fraud are referred to the DWP for
investigation and resultant savings are not attributed back to councils.
In 2022/23 almost £2 million of savings arose from these referrals. £0.2
million of savings was identified locally by 17 councils, largely from the
follow-up of matches to student loans.
186

Page 187

4. Specific match areas 20
Exhibit 11.
Pensions savings by NFI exercise
Follow-up activity and recording of outcomes in 2020/21 was impacted by Covid 19.
Source: NFI management information
0
3
6
2022/232020/212018/192016/17
£5.4m
£3.2m 
£1.5m
£5.6m
2.8
0.40.7
4.8
0.1
1.4
5.1
0.5
Estimated forward savings
Actual overpayments
£ million
Pensions
38. The NFI is an efficient and effective way for the Scottish Public
Pensions Agency (SPPA) and councils that administer pensions to check
that they are only paying pensions to people who are alive.
39. The follow-up of matches has led to the identification of actual
overpayments of £0.5 million as at 31 March 2024, with projected
forward savings amounting to a further £5.1 million. These savings are
shown along with those reported for previous exercises in Exhibit 11.
40. Forward savings are estimated based on a potential payment period
from the date overpayments are identified until the date the deceased
pensioner would have reached the age of 85 (consistent with actuarial
assumptions used to value public sector pension schemes).
41. In 2022/23 we have seen improved follow-up of pensions matches.
However, not all overpayments identified had been recorded by 31 March
2024. Late savings will be reported as part of the 2024/25 exercise as 
a result.
187

Page 188

4. Specific match areas 21
Exhibit 12.
Blue Badges outcomes and case numbers by NFI exercise
There have been higher levels of recorded cancellation in 2022/23 than for 
recent exercises.
Source: NFI management information
0.0
2.0
4.0
2022/232020/212018/192016/17
Badges cancelled
Notional outcomes
£ million
Thousand
4,505
3,215
4,616 5,140
£1.8m
£2.6m £2.7m
£3.3m
0
3
6
2022/232020/212018/192016/17
Blue Badges
42. The Blue Badge scheme allows individuals with mobility problems
to park for free at on-street parking meters, in ‘pay and display’ bays, in
designated Blue Badge spaces, and on single or double yellow lines in
certain circumstances. Badges are sometimes used by unauthorised
persons after the badge holder has died. Not only is this an offence under
the Disabled Persons’ Parking Badges (Scotland) Act 2014, but it may also
result in parking spaces being denied to people who legitimately use the
Blue Badge scheme.
43. The NFI matches Blue Badges issued to records of deaths, enabling
badges to be cancelled. The number of badges cancelled in 2022/23 has
gone up to 5,140, as shown at Exhibit 12.
188

Page 189

4. Specific match areas 22
44. The increased number of cancellations, together with a new estimate
multiplier, has resulted in a higher notional outcome value. The Cabinet
Office estimation methodology now applies £650 per badge cancelled
(compared to £575 per badge in 2020/21).
Housing Tenancy
45. With reported housing shortages and high levels of homelessness,
tenancy fraud is increasingly an issue for councils. Where fraudulent
subletting exists, it means that properties are not available to house
people who are in most need and this can be costly to councils.
46. The NFI uses council housing tenancy data to identify possible cases
where tenants may have sublet their property. It also helps identify cases
where the tenant has died, and the property is either empty or has other
individuals living in it.
47. As a result of the 2022/23 exercise, councils were able to identify and
recover ten properties. A housing association property was also identified
and made available for social housing. The numbers of properties
recovered along with the notional outcome estimates for the last four
exercises are shown at Exhibit 13 (page 23).
48. Notional outcomes of £78,300 are allocated per property recovered
(£93,000 in 2020/21). This is based on an average four-year fraudulent
tenancy and includes estimated costs of temporary accommodation for
genuine applicants; legal costs to recover property; re-let cost; and rent
foregone during the void period between tenancies.
49. In addition to recovery of properties, NFI has enabled several councils
to update tenancy details where there has been legitimate succession
following a bereavement.
189

Page 190

4. Specific match areas 23
Exhibit 13.
Housing Tenancy outcomes and case numbers by NFI exercise
Tenancies recovered as a result of NFI have remained in double figures in 2022/23.
Source: NFI management information
0.00
0.50
1.00
2022/232020/212018/192016/17
£ million
2 1
10 11
£0.09m
£0.19m
£0.93m £0.86m
Notional outcomes
Tenancies recovered0
6
12
2022/232020/212018/192016/17
Housing Waiting Lists
50. Councils maintain waiting lists for council housing, and in some
cases for all social housing in their area. The NFI matches waiting list
data to housing tenancy data and other data sets, enabling undisclosed
changes in circumstances to be picked up. This enables removal of
ineligible applicants from the waiting list, stops inappropriate allocations,
and accelerates allocations to people in genuine need of social housing.
51. In 2022/23 we have seen an increase in the number of applicants
removed from waiting lists as a result of NFI. Notional outcomes have
also increased as shown in Exhibit 14 (page 24).
190

Page 191

4. Specific match areas 24
52. Notional outcomes are attributed to applicants removed from the
waiting list on the basis that social housing could have been allocated
inappropriately. The estimation methodology allocates £4,283 per case
removed from the waiting list (an increase from £3,240 per application in
2020/21).
Exhibit 14.
Housing Waiting List outcomes and case numbers by NFI exercise
More applicants have been removed from the waiting list in 2022/23 than in 
previous exercises.
Source: NFI management information
0.0
0.8
1.4
2022/232020/212018/192016/17
£ million
90
230
187
280
£0.7m
£0.3m
£0.6m
£1.2m
Notional outcomes
Applicants removed
from waiting list0
150
300
2022/232020/212018/192016/17
191

Page 192

255. Pilot exercises and future developments
5. Pilot exercises and future
developments
Social Security Scotland took part in a pilot data-matching
exercise which identified limited fraud and error. We 
are also exploring the possibility of involving wider 
public sector bodies in the 2024/25 NFI exercise on a
voluntary basis.
Social Security Scotland – benefits pilot 2022
53. In 2022 a pilot exercise was undertaken with Social Security Scotland
(SSS) to identify any instances where claimants received support but
were not residing in Scotland, or where claimants appear to have claimed
benefits more than once (eg, from more than one Scottish address). The
pilot exercise included payments made in the three-month period from
April to June 2021.
54. Around 45,000 lines of data relating to benefit payments were
submitted for matching, resulting in the identification of 367 claimants
who appeared to be residing outwith Scotland. Following review and
corroboration of addresses by SSS there were just 17 cases where
claimants were not entitled to benefits. Overpaid benefits of £16,450
were identified, a further £20,000 could have been paid out in relation to
these claims, over the remaining eligibility periods.
55. Despite the identification of fraud and error, the number and value
of cases was not deemed sufficient to justify the inclusion of this match
type in the main biennial NFI exercise in 2022/23. The intention is to
run another pilot in 2024/25 which may also include Adult Disability
Payments for the first time.
Inclusion of bodies on a voluntary basis
56. There are potential benefits from expanding the NFI to include 
more public sector bodies in Scotland. We invited Scottish housing
associations and universities to participate in the 2024/25 NFI on a
voluntary pilot basis.
57. While no universities have volunteered for participation, we are
working with several interested housing associations. At this time, it is
unclear how many of those interested will actually participate.
192

Page 193

26Appendix
Appendix
Estimated outcomes methodologies
In some cases NFI outcomes include an estimated
element for forward savings or for where no
monetary value can be recovered
The NFI uses the term ‘outcomes’ to refer to the financial value of fraud,
error and overpayment that can be attributed to NFI data matching. In
some cases NFI outcomes include an estimated element which seeks 
to capture:
• The value of loss from a fraud or error detected because of an NFI
match, in instances where no monetary value can be recovered -
such as the value of recovering a property from a tenant who has
fraudulently obtained that tenancy. We have called these ‘notional
outcome estimates’ in our report.
• The value of any future losses that may have been incurred without
intervention as a result of an NFI match. For example, the value
of future overpayments prevented through detecting and stopping
a fraudulent or erroneous housing benefit claim. We have called
these ‘forward savings’ in our report.
Most NFI datasets have a methodology to calculate estimated outcomes.
These methodologies account for:
• data relevant to the fraud problem, including national published data
and data from previous NFI cases
• the policy context relative to the fraud problem
• any regional variances that may result in the generation of estimate
methodologies specific to a region or area
• alignment where possible with relevant estimated savings
methodologies used in other central government departments.
All methodologies are reviewed prior to the start of each new NFI
exercise. Any changes are reviewed by the Cabinet Office NFI
Governance Board and approved by the Cabinet Office Fraud Prevention
Panel. This panel consists of cross government counter fraud experts
(including representatives from DWP, HMRC, NHS, MOD, BEIS, DFID,
NAO, etc.) who review and challenge, where necessary, methodologies
for calculating the estimated value of fraud prevention initiatives across
government departments.
193

Page 194

Appendix 27
Once approved, these methodologies are built into the NFI web
application to enable the estimated outcomes element to be
automatically generated.
A summary of the outcomes methodology calculations applied to NFI
datasets is set out in the following table:
Data match 
Basis of calculation of forward savings and 
estimated outcomes 
Council tax single 
person discount 
Forward savings – Annual value of the discount cancelled
multiplied by two years. 
Council tax 
reduction scheme
Forward savings – Weekly change in council tax discount
multiplied by 33 weeks (increased from 21 weeks in 2020/21).
Housing benefit  Forward savings – Weekly benefit reduction multiplied by 
21 weeks. 
Pensions  Forward savings – Annual pension multiplied by the number of
years until the pensioner would have reached the age of 85.
Housing Tenancy Notional outcomes – £78,300 per property recovered, based
on average four–year fraudulent tenancy. Includes: temporary
accommodation for genuine applicants; legal costs to recover
property; re–let cost; and rent foregone during the void period
between tenancies (reduced from £93,000 in 2020/21).
Housing waiting lists Notional outcomes – £4,283 for each case based on the annual
estimated cost of housing a family in temporary accommodation,
the duration a fraud may continue undetected and the likelihood a
waiting list applicant would be provided a property (increased from
£3,240 in 2020/21).
Blue Badges  Notional outcomes – Number of badge holders confirmed
as having died multiplied by £650 to reflect lost parking and
congestion charge revenue (increased from £575 in 2020/21).
Concessionary bus travel Forward savings – Number of bus passes used fraudulently
multiplied by £420. Based on average fraudulent use and
reflecting two years forward use.
Payroll   Notional outcomes – £5,685 for each employee dismissed or
resigns as a result of NFI matching. (up from £5000 in 2020/21).
194

Page 195

The National Fraud
Initiative in Scotland
2024
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot
ISBN 978 1 915839 46 6 
195

Page 196

196

Page 197

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee
Title: Internal Audit Annual Update Report – North Ayrshire
Integration Joint Board (IJB)
Purpose: To inform the Committee of the IJB’s annual report for 2023/24
and the approved internal audit plan for 2024/25.
Recommendation: That the Committee notes the IJB annual report and approved
internal audit plan. 
1. Executive Summary 
1.1 Section 21.7 of the North Ayrshire Integration Joint Board’s Financial Regulations
states: “The Integration Joint Board Chief Internal Auditor will submit an annual audit
report of the Internal Audit function to the Chief Officer and the Performance and Audit
Committee indicating the extent of audit cover achieved and providing a summary of
audit activity during the year. As a minimum the annual audit report and Chief Internal
Auditor’s opinion will also be reported to the Audit Committees of the NHS Ayrshire &
Arran Board and North Ayrshire Council”. 
1.2 The remit of the IJB’s Performance and Audit Committee (PAC) includes the review of
the overall internal control arrangements of NAIJB. The IJB annual report for 2023/24
and the proposed internal audit plan for 2024/25 were provided to the PAC on 30
August 2024. 
1.3 The annual report and audit plan will also be provided for information to the Audit and
Risk Committee of NHS Ayrshire and Arran on 18 November 2024. 
2. Background 
Annual Report 2023/24 
2.1 The 2023/24 IJB internal audit plan was approved by the PAC in June 2023 and
included a review of the IJB’s workforce planning arrangements. This audit has
been finalised and the findings were reported to the committee in March 2024.
Overall, substantial assurance was obtained with regard the details presented within 
the IJB Workforce Plan. However, it was acknowledged that the ability to deliver is
dependent on several factors, not all of which are within the control of the HSCP.
Agenda Item 10
197

Page 198

2.2 The opinion on the control environment of the IJB is also influenced by the audit
findings relating to the key systems of North Ayrshire Council and NHS Ayrshire and
Arran and by relevant audit work within service areas that are part of the Health and
Social Care Partnership. The annual report on audit work within North Ayrshire
Council was presented to the Audit and Scrutiny Committee of the Council on 30 May
2024. The annual report for NHS Ayrshire and Arran was presented to the Audit and
Risk Committee of the NHS on 16 May 2024. 
2.3 Based on the audit work carried out in the IJB and relevant work carried out in the
parent bodies, my opinion is that reasonable assurance can continue to be placed on
the adequacy and effectiveness of the IJB’s systems of governance, risk and internal
control. 
Internal Audit Plan 2024/25 
2.4 The internal audit plan for 2024/25 was approved by the PAC on 30 August 2024.
The IJB has its own audit plan which includes 25 days drawn from the Internal Audit
service of North Ayrshire Council – 15 days being utilised to carry out the approved
audit assignment for the year. 
2.6 A further 10 days have been set aside to fulfil the IJB Chief Internal Auditor role; this
will include preparing reports for the IJB, attending meetings and providing training
and support to members of the IJB Performance and Audit Committee. 
2.7 It was agreed that the 15 days will focus on the IJB’s transformation programme
given the refreshed focus of the transformation plan for the next three years. 
2.8 NHS Ayrshire and Arran (NHSAAA) has contracted out the delivery of Internal
Audit services to Azets. 
3. Proposals 
3.1 It is proposed that the Committee notes the North Ayrshire Integration Joint Board
annual report for 2023/24 and the approved internal audit plan for 2024/25. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None.
198

Page 199

Equality/Socio-economic
4.4 None.
Climate Change and Carbon
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the IJB’s strategic
priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 In preparing the draft IJB audit plan, consultation has taken place with the Director and
the Chief Finance and Transformation Officer of the North Ayrshire IJB and with the
internal auditors of the East and South Ayrshire Integration Joint Boards. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.
199

Page 200

200

Page 201

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee 
Title:    Internal Audit Plan 2024/25: Mid-year Update 
Purpose:  To provide an update on progress made in delivering the
2024/25 Internal Audit Plan. 
Recommendation:  That the Committee (a) notes the current position with the
2024/25 internal audit plan, (b) approves the inclusion of seven
additional audit review in 2024/25, and (c) approves the deletion
or deferral of two audits for consideration as part of the 2025/26
internal audit plan. 
1. Executive Summary 
1.1 The current Internal Audit Plan for 2024/25 was approved by the Audit and Scrutiny
Committee in March 2024. The plan sets out the areas of work which Internal Audit
intends to cover during the year. 
1.2 The Public Sector Internal Audit Standards (PSIAS) recognise that it is good practice
to regularly review and adjust the plan, as necessary, in response to changes in the
organisation’s business, risks, operations, programmes, systems and controls. 
1.3 Some amendments are proposed to the internal audit plan for 2024/25 and these are
detailed within this report and Appendices B and C. 
2. Background 
2.1 Appendix A to this report is the approved audit plan for 2024/25. For each audit
additional information has been provided to show the actual activity to 30 September
2024. 
2.2  In line with good practice, the plan should be reviewed during the year in light of
experience gained from audit work carried out, emerging risks to the Council and the
changing environment in which audit work is carried out. 
2.3  With Committee approval, the following audits will be deleted or deferred for
consideration as part of the 2025/26 plan (Appendix B):
• Agency Staff and Workers – Originally intended for Q2 of 2024, this audit was
planned to review the Council’s compliance with IR35 procedures.  However
following consultation with People and ICT, and in order to prioritise audit resources,
Agenda Item 11
201

Page 202

it is proposed that this audit is delayed until the new financial year, so that key risk
areas around payroll and ICT can audited within the current financial year.
• Community Associations – This audit was included in the long list of audits agreed
by the Committee in March 2024, however work in this area was brought forward
and completed as part of the 23/24 audit plan. 
2.4  Using a risk-based approach and in consultation with Chief Officers in each of the
Council’s directorates, seven additions to the audit plan, for completion during Q3 & Q4,
are noted in Appendix C. These have been selected from the rolling long list of audits
that were presented to the committee in March 2024. An updated copy of the rolling
long list of audits is in included at Appendix D and future audits will be drawn down from
this where capacity allows. 
2.5  It should be noted that the first two quarters have been challenging due various factors,
including staff turnover, sickness absence within the team and a higher-than-normal
volume of unplanned audit investigations. Any further amendments to the audit plan will
need to be considered within the context of available resources. 
2.6 A further progress update, along with any proposed audit plan amendments will be
brought to the committee for consideration in January 2025. 
3. Proposals 
3.1 It is proposed that the Committee: 
(a) notes the current position with the 2024/25 internal audit plan, as specified in
Appendix A, 
(b) approves the deletion or deferral of two audit for consideration as part of the 2025/26
internal audit plan, and, 
(c) approves the inclusion of the seven additional audit reviews noted in Appendix C in
2024/25. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
202

Page 203

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2023-2028 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. Services have also been consulted on the proposed changes to the
internal audit plan. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk and Insurance, on 01294 324607. 
Background Papers
None.  
203

Page 204

Internal Audit Plan 2024/25 Quarters 1 & 2                                                                      Appendix A 
Audit Area to Deliver in Plan Directorate /
Service
Planned
Quarter
Priority Link to Council Plan Link to Risk Registers Progress to Date 
Transformation and Change
Management 
Corporate  Q1  A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
Strategic Risk  Fieldwork Ongoing 
ICT - Environmental and Physical
Security 
People & ICT  Q1  A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
Strategic Risk  Fieldwork Ongoing 
ICT - Access Control  People & ICT  Q1  A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
Strategic Risk  To Start 
Aids & Adaptations  HSCP  Q1  B
Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people  Operational Risk  To Start 
Pupil Equity Funding  Education  Q1  A
Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people  Operational Risk  Fieldwork Ongoing 
Accounts Payable Transaction
Testing 
Finance  Q1/Q2  A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
N/A  Fieldwork Ongoing 
ICT - Information Security
Management 
People & ICT  Q2  A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
Strategic Risk  To Start 
Locality Planning  Communities
& Housing 
Q2  B
Communities and Local Democracy – we will have active, inclusive and resilient
communities  Operational Risk  To Start 
Community Care store  HSCP  Q2  A
Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people  N/A  To Start 
Agency Staff & Workers  People & ICT  Q2  A  N/A  N/A
Proposed deferral
to 25/26 – See
Appendix B 
Child Protection  HSCP  Q2  A
Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people  Operational Risk  To Start 
Tenants & Residents
Associations 
Communities
& Housing 
Ongoing  D  Communities and Local Democracy – we will have active, inclusive and resilient
communities 
N/A  Complete
Consultancy - Sustainability &
Climate Change
Place Ongoing A Climate Change – achieving net-zero by 2030 Strategic Risk Ad Hoc
Consultancy - Waste Review Place Ongoing B Climate Change – achieving net-zero by 2030 N/A Ad Hoc
204

Page 205

Proposed Deletions / Deferrals from the Audit Plan              Appendix B 
Audit Area to Deliver in Plan Directorate /
Service
Planned
Quarter
Priority Summary Explanation
Agency Staff & Workers People & ICT Q2 A Originally intended for Q2 of 2024, this audit was planned to review the Council’s compliance with IR35 procedures. 
However following consultation with People and ICT, and in order to prioritise audit resources, it is proposed that this
audit is delayed until the new financial year, so that key risk areas around payroll and ICT can audited within the current
financial year.  It is proposed that this will now be considered for inclusion as part of the 25/26 audit plan.
Community Associations Communities
& Housing
N/A B This audit was included in the long list of audits agreed by the Committee in March 2024, however work in this area was
brought forward and completed as part of the 23/24 audit plan.  Propose the removal of this audit from the current rolling
long list but will be considered for future audit plans, following a risk assessment. 
Additions to the Internal Audit Plan 2024/25 for Quarters 3 & 4             Appendix C 
Audit Area to Deliver in Plan Directorate/Service Planned
Quarter
Priority Link to Council Plan Link to Risk Registers
Income Collection Finance Q4 A A Sustainable Council – a Community Wealth Building Council that is
efficient and accessible, maximising investment and focusing resources
towards our priorities
N/A
Procurement Finance Q4 B A Sustainable Council – a Community Wealth Building Council that is
efficient and accessible, maximising investment and focusing resources
towards our priorities
N/A
Payroll Transaction Testing People & ICT Q3 A N/A N/A
ICT Asset Management People & ICT Q4 A A Sustainable Council – a Community Wealth Building Council that is
efficient and accessible, maximising investment and focusing resources
towards our priorities
Strategic Risk
IJB - Transformation HSCP Q3 A N/A N/A
Homelessness Communities & Housing Q4 A Wellbeing – to transition to a wellbeing economy, delivering prosperity,
wellbeing and resilience for local people
Operational Risk
Ayrshire Growth Deal Place Q4 A A Sustainable Council – a Community Wealth Building Council that is
efficient and accessible, maximising investment and focusing resources
towards our priorities
Operational Risk  
205

Page 206

Rolling Internal Audit Plan                                                                               Appendix D 
These reviews will form part of the rolling plan for future audits. The plan will continue to be adjusted as the year progresses to reflect current organisational risks and issues. Ongoing risk assessments will be
undertaken to determine the priority areas to include in the plan. 
Potential Future Audit Areas Directorate/Service Priority Link to Council Plan Link to Risk Registers
Corporate Performance All B All N/A
Advisory - Equalities Democratic B N/A Strategic Risk
Freedom of Information Democratic B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities
Corporate Risk and 
Operational Risk
Subject Access Requests Democratic B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities
Corporate Risk and 
Operational Risk
Capital Monitoring Finance B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Strategic Risk
Health & Safety Finance C N/A N/A
Absence Management People & ICT A N/A N/A
Agency Staff & Workers People & ICT A N/A N/A
Fuel Controls Place B N/A N/A
Overtime Controls in Streetscene Place B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Flood Programme Place C Climate Change – achieving net-zero by 2030 Strategic Risk and
Operational Risk
Advisory - Decriminalised Parking
Arrangements
Place C N/A N/A
Shared Prosperity Fund Place C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Waste Operations – Absence &
Overtime Controls
Place A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Operational Risk
Community Based Support -
Young People
HSCP B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk
Care Homes - sustainability HSCP B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Financial Assessments - non-
residential
HSCP C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Overtime controls in HSCP HSCP B N/A N/A
Social Care Establishments HSCP C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Stores Controls Communities &
Housing C N/A N/A
Community Associations Communities &
Housing B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk 
206

Page 207

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee
Title: Corporate Fraud Team update report
Purpose: To provide the Audit and Scrutiny Committee with an update
report on the work of the Corporate Fraud Team between April
and September 2024.
Recommendation: That the Committee notes the work carried out by the Corporate
Fraud Team. 
1. Executive Summary 
1.1 The Corporate Fraud Team provides the Council with the capacity to investigate fraud
both within and against the organisation. 
1.2 Committee receives bi-annual updates on the work of the team. This report provides
an overview of the activity of the team between April and September 2024. 
2. Background 
Referrals 
2.1 Referrals for investigation have been made to the team from a number of different
sources, including Revenues and Benefits and Housing, members of the public and
other agencies and local authorities. The publicity used by the team, including posters
and leaflets, advertising on Council vans and contact information on the Council
website, continues to be successful in generating a stream of referrals. 
2.2 Investigations have been carried out across a range of areas including employee-
related matters as well as Council Tax, Discretionary Housing Payments, Scottish
Welfare Fund, Blue Badges and Housing tenancy issues. Although responsibility for
investigating Housing Benefit fraud now lies with the DWP Single Fraud Investigation
Service (SFIS), issues may be identified by the Corporate Fraud Team which can
result in changes being made to benefits in payment. Joint working arrangements are
in place with the DWP for cases where there are suspected frauds relating to both
DWP benefits and Council Tax Reduction. 
2.3 The team investigates all tenancy abandonments which are referred by Housing.
While Housing focus on recovering the tenancy, the Corporate Fraud Team can add
value by locating the missing tenant, which can often lead to changes to benefits or
Agenda Item 12
207

Page 208

discounts in payment elsewhere, as well as enabling Housing to recover costs
associated with house clearances and cleaning.
2.4 Employee-related investigations are the subject of a separate report to the appropriate
Service and the findings are also reported to the Audit and Scrutiny Committee as
each investigation is finalised.
Financial outcomes for April to September 2024
2.5 The team received 162 referrals for investigation during the first half of 2024/25
(2023/24: 181 referrals). Analysis of these referrals shows that 109 referrals were
received from internal sources, and 53 from external sources.
2.6 The team investigates 100% of referrals made. During the period, 191 cases were
closed (2023/24: 193 cases). These can be categorised as follows:
Category Number of Cases
Closed with no issues identified 88
Referred to another agency (including SFIS) or Council
Service for investigation
48
Closed with results achieved (fraud, error or other
recovery/action)
55
TOTAL 191
2.7 Fraud and error totalling £0.037m were identified and are categorised in the table
below:
Category Value (£000)
Housing Benefit 0
Council Tax (including CTR, Single Person Discount
and other recoveries)
24
Housing 4
Other (including employee investigations) 9
TOTAL 37
Non-financial outcomes for April to September 2024
2.8 In addition to the financial outcomes noted above, other outcomes/benefits were noted
as follows:
• Thirty tenancies were recovered by Housing with some assistance from the
Corporate Fraud Team;
• Nine warning letters were issued for blue badge misuse, with a further badge
being recovered for misuse.
• Three employee investigations have been undertaken which have resulted in
reports with actions and of those, two included conduct / disciplinary issues.
• Six corrections and updates to records have been made to ensure record
keeping is up to date.
208

Page 209

International Fraud Awareness Week
2.9  International Fraud Awareness Week (IFAW) takes place from 17 – 23 November
2024. This year awareness will be through the promotion and sharing of fraud related
social media posts, from across the UK public sector.
National Fraud Initiative (NFI)
2.10 The NFI is a long-established exercise which takes place across the UK every two
years and involves the matching of relevant datasets across public bodies to identify
possible fraud or error for further investigation.
2.11 The Corporate Fraud Team coordinates the exercise for the Council and the
2024/25 National Exercise is now underway. Data sets for the exercise require to
be submitted to the Cabinet Office between 1st and 25th October. When all data
sets are received they will be quality checked, matched and reports containing
matches will be released to participating organisations for investigation.  It is
expected that match reports will start being released in December 2024.  The
investigation of match reports is carried out by relevant Services, co-ordinated by
the Key Contact, and participants will have until 31st March 2026 to complete this
piece of work.
2.12 Progress updates will be provided at future Audit and Scrutiny Committee
meetings, with the final outcomes being reported by Audit Scotland in Summer
2026.
3. Proposals
3.1 It is proposed that the Committee notes the work carried out by the Corporate Fraud
Team.
4. Implications/Socio-economic Duty
Financial
4.1 None.
Human Resources
4.2 None.
Legal
4.3 None.
Equality/Socio-economic
4.4 None.
Climate Change and Carbon
4.5 None.
209

Page 210

Key Priorities 
4.6 The work of the Corporate Fraud Team helps to support the efficient delivery of the
strategic priorities within the Council Plan 2023-2028. 
Community Wealth Building
4.7 None.
5. Consultation
5.1 No consultation has been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None
210

Page 211

PUBLIC INFORMATION
PUBLIC INFORMATION 
NORTH AYRSHIRE COUNCIL
31 October 2024                                                                                                                                                            
Audit and Scrutiny Committee
Title: Internal Audit Reports issued
Purpose: To inform the Committee of the findings of Internal Audit work
completed between August and September 2024.
Recommendation: That the Committee notes the outcomes from the Internal Audit
work completed.
1. Executive Summary
1.1 The Council's local Code of Corporate Governance requires effective arrangements to be
put in place for the objective review of risk management and internal control.  Internal Audit
is an important element in this framework as it reviews internal controls and offers Elected
Members and officers an objective and independent appraisal of how effectively resources
are being managed.
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal Audit
activity.  The submission of regular reports assists the Committee in fulfilling this
remit.
2. Background
2.1 This report provides information on Internal Audit work completed between August and
September 2024.  Internal control reviews have been completed in respect of the areas
detailed in Appendix 1 to this report. The aim of these reviews is to provide assurance that
the internal control framework within the areas examined is appropriate and operating
effectively.
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of Service
on the completion of each assignment.  Where appropriate, this has included an action plan
with recommendations for improving internal control.  Appendix 1 includes the report and
action plan from each audit.
2.3 The findings from 3 separate audit assignments are detailed at Appendix 1 to this report
and the levels of assurance for each are noted in the table below:
Agenda Item 13
211

Page 212

PUBLIC INFORMATION
PUBLIC INFORMATION 
Audit Title Assurance Level
Leavers and Movers Limited
Property Asset Management Reasonable
Housing Rent Arrears Substantial
3. Proposals
3.1 It is proposed that the Committee notes the outcomes from the Internal Audit work
completed between August and September 2024.
4. Implications/Socio-economic Duty
Financial
4.1 None.
Human Resources
4.2 None.
Legal
4.3 None.
Equality/Socio-economic
4.4 None.
Climate Change and Carbon
4.5 None.
Key Priorities
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic priorities
within Our Council Plan 2023-2028.
Community Wealth Building
4.7 None.
5. Consultation
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment.
212

Page 213

PUBLIC INFORMATION
PUBLIC INFORMATION 
Mark Boyd
Head of Service (Finance)
For further information please contact John McCallum, Senior Manager (Audit, Fraud, Safety,
Risk & Insurance), on 01294 324607. 
Background Papers
None.
213

Page 214

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT
LEAVERS AND MOVERS PROCESS
IN EDUCATION
Assurance Level: Limited
Version: Final
Date: 21st August 2024
Author: Yvonne Trundle
File Ref: 2024-PA-003
Classification: Public
214

Page 215

PUBLIC INFORMATION
PUBLIC INFORMATION 
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2
2.1 
LEAVERS AND MOVERS PROCESS IN EDUCATION
Background
The audit reviewed the controls around employees in Education who move jobs within
the Council as well as employees who leave the Council, with a particular focus on
access to personal and sensitive information.  The audit focussed on the IT process
but it incorporated the HR process to ensure the process is clear for Head Teachers. 
A similar audit was carried out on the Corporate network and the final report was
issued in June 2022. 
This audit was restricted to the 9 secondary schools as each secondary school has an
ICT Technician who is responsible for the new start and leaver process in active
directory which allows users access to the resources on the Education network drives.
Primary schools and Lockhart are supported via corporate ICT Technicians.
There are a number of different types of users that need network access and
potentially need access to the IT systems used in the schools.  There are employees
with permanent, temporary or casual contracts.  Employees with casual contracts are
supply staff that could be in a school for a varied length of time (e.g. a day, a week, a
month, up to a maximum of 12 weeks) and often no prior notice is given for such
employees starting.  There are employees that work in a school, but as per the position
details on the Payroll system are located to a central location rather than a specific
school.  Examples of such employees are Active Schools Coordinators, Library
staff, School Counsellors, Music Instructors etc.  There are users that are not
employees, for example, Campus Police Officers, Careers Officers, School
Nurses and Student Teachers. 
There are a number of IT systems used in the schools.  This audit included a review
of users with access to SEEMIS which is an Education Management Information
System offering a range of modules to support pupil and staff record management and
an app called Xpressions which is used to send communication to parents.  In addition,
key staff in each school have an Outlook account for sending personal and sensitive
data.
All employees have a work record within SEEMIS and if they need access to the
SEEMIS system, they are also given a user profile.  When an employee leaves the
school, the work record is closed, and the access is removed.  If an employee moves
within the school, the access may need to be amended.
The Service advised that a census exercise was carried out just prior to the audit which
resulted in the SEEMIS users being reviewed and updated in line with current staff.
This exercise highlighted issues with SEEMIS not being timeously updated when a
user leaves.  The findings carried out on SEEMIS users as part of this audit reflects
this exercise.  
Objectives and Scope
The main objectives of this audit were to ensure that:
• Appropriate policies and procedures are in place covering the process for removing
IT access for leavers and amending IT access for movers.
• Network access has been deactivated or amended in a timely manner for leavers
and movers.
215

Page 216

PUBLIC INFORMATION
PUBLIC INFORMATION 
• System access has been deactivated or amended in a timely manner for leavers
and movers.
• Processes are in place to remove or amend access to Corporate Office 365 for
leavers and movers and there are proper controls in place over shared mailboxes.
2.2 The scope of the audit covered the controls in relation to the Education network only.
The audit focussed on secondary school staff only and excluded pupils.  
3 Findings
Leavers and Movers Process for Network Access
3.1 Each of the ICT Technicians were contacted to ask how they are notified that a staff
member is leaving.  This highlighted that there is an informal process in place with
some being notified by email or word of mouth.  Most are notified by the Education
Business Officer (EBO).  There is no documented formal process of how the ICT
Technicians should be informed a member of staff is leaving to allow the Active
Directory (AD) account to be deleted.  (action a)
3.2 The auditor tested the ICT Guidance Leavers Procedure that was implemented as part
of a previous internal audit.  This test highlighted that 6 out of 9 ICT Technicians
provided the sample of leavers forms.  However, in 2 cases the leavers forms were
either completed and/or approved by the Head Teacher retrospectively. In another
case the leavers forms did not record the leaving date or record when the AD account
was deleted.  One of the ICT Technicians had not previously completed the leavers
form but will now start using them.  The other 2 ICT Technicians did not reply or provide
the requested information due to being on sick leave. (action b)
3.3 IT Services are planning to replicate the Corporate automated movers and leavers
process in Education.  If the ICT Technician is not notified of a leaver or mover, the
automated process will ensure the AD account is deleted when an employee leaves
or amended if an employee moves.  In order for this to work, the new start process
needs to capture mandatory information including employee number and email
address. IT Services carried out a cleansing exercise to ensure missing employee
numbers for historic users was captured.
IT services developed an AD user creation tool to be used by the ICT Technicians
when adding a new start to AD.  In January 2024 and after discussions with the ICT
Technicians, the Technology Officer requested the ICT Technicians use this tool to
ensure the employee number is captured at the AD account creation stage.  In June
2024, the Technology Officer advised not all ICT Technicians are using the new user
creation tool resulting in accounts being created manually that are missing the
employee number.  IT Services have drafted an email that will be issued by the Senior
Manager to advise the ICT Technicians that it is mandatory to use this app.
The ICT Technicians advised one of the issues with using the new app is that they are
not always notified in advance of a new start and are not always provided with the
employee number and email address. This was discussed with the Service as there is
no formal process in place to ensure the ICT Technician is notified of a new start in
advance and to ensure the mandatory information is provided to allow the AD user
creation tool to be used. (action c)
216

Page 217

PUBLIC INFORMATION
PUBLIC INFORMATION 
3.4 There were 1,114 active AD users on a report provided by IT Services which were
matched to the Payroll system.  This test identified 34 leavers.  IT Services were
contacting the ICT Technicians to clean up AD at the time of writing.   
3.5 The data match identified 28 generic AD accounts that should be reviewed and
removed if no longer needed. (action d)
3.6 The data match identified 24 AD accounts that were passed to IT Services as the
employee number on AD has been recorded incorrectly, to allow the correct employee
number to be recorded. 
3.7 There were 49 leavers from secondary schools as per the Payroll system report from
April 2023 to November 2024 and 4 of them were overpaid by 2 weeks but this has
been identified and rectified by the Payroll team. 
3.8 There were 20 secondary school staff members that moved within Education between
March and September 2023 as per the IT movers and leavers report.  A sample of 5
were selected to check the movers AD access had been amended and there were no
findings to report.
3.9 There were 3 secondary school staff members that moved from Education to
Corporate between March and September 2023, as per the IT movers and leavers
report, and 1 of them still had AD access in the school they previously worked in but
this has been deleted by the relevant ICT Technician.  
3.10 There have been discussions with IT and Education regarding how the AD access for
supply staff should be controlled.  Further discussion is required to agree the best
approach for removing this access, giving consideration to time spent adding and
removing such users as well as ensuring access is not retained for longer than
necessary. 
Leavers and Movers Process for System Access
3.11 Each of the EBOs were contacted about the leavers process for the SEEMIS system
and all of them confirmed they will close the work records and remove the access for
leavers.  The majority are informed by the Head Teacher but some did not specify who
informs them.  Some also receive the resignation letters and are involved in the
recruitment process for the leaver’s replacement.  Some advised the leavers are
confirmed via email or verbally.  There is no formal documented process in place for
the leavers process to ensure work records are closed and access is removed. (action
e)
3.12 Each of the EBOs were contacted about the movers process for the SEEMIS system
and all confirmed once they are informed of a change in post, they would amend the
SEEMIS access, where necessary.  Only four of the schools advised they are involved
in the recruitment process, which is how they are informed of movers and 1 advised
they are usually informed via email or in person.  There is no formal documented
process in place for the movers process to ensure access is appropriate for the new
job role, particularly when a promoted post ends and additional access should be
removed.  (action f)
3.13 Each of the EBOs were contacted to ask if they carry out periodic reviews of SEEMIS
users.  Only 1 school confirmed they did not carry out such a review and the other
responses varied from once a year to every 8 weeks.  The new formal documented
217

Page 218

PUBLIC INFORMATION
PUBLIC INFORMATION 
process should advise that a full review should be carried out at least twice per year.
(action g)
3.14 There were 1,089 SEEMIS users and a data match was carried out to the Payroll
system.  This data match resulted in 146 queries being passed to the EBOs to
investigate and included users that could not be traced to the Payroll system, users
that had left, and users with a different school location as per the Payroll system.  The
EBOs reviewed the queries and took appropriate action.  Action taken included
removing access to 21 leavers, removing access to 5 movers and changing the access
profile for 9 users.  This data match also identified 2 external users.
3.15 The data match identified that non-teaching staff such as Active Schools Coordinators,
Library staff, School Counsellors, Music Instructors have access to SEEMIS.  The
data match also identified non-council employees such as Campus Cops, Careers
Officers and School Nurses have access to SEEMIS.  Education should review
such users to decide whether these users should have access to this system or
whether relevant information should be sought from pastoral/guidance staff.
3.16 The data match identified 50 duplicate usernames at the same school and 12 duplicate
usernames at different schools.  The EBOs reviewed the duplicate usernames and 22
work records were closed as a result of this check.  There are genuine reasons why a
user would need more than 1 work record including a teacher that works at different
schools or have more than 1 post at the same school.
3.17 The auditor summarised the users per user profile which determines the level of
access they have.  There are 43 user profiles being used.  The auditor selected
a sample of user profiles selected to test – Counsellor, Pastoral, Principal Teacher,
Office and Security.  There were 307 users with the selected user profiles that were
reviewed by the EBOs which resulted in action being taken to amend 21 user
access profiles and to remove access for 14 users.  In addition, Auchenharvie
and Greenwood Academies have a high number of users with the Security and/or
Office-Security user profiles.  (action h)
3.18 The auditor carried out testing on Groupcall Xpressions which is used to communicate
with parents and 8 out of the 9 secondary schools use this application.  This testing
highlighted that the number of users varies per school and ranges from 11 to 32 users. 
Testing identified 1 leaver and 4 movers that still had access and the relevant EBO
has since removed this access. 
3.19 The Groupcall Xpressions testing also identified 7 users with personal email
addresses set up and 1 user with a generic school email address set up.  The relevant
EBOs agreed to amend the email addresses to their Glow email account. 
Shared Mailboxes
3.20 The auditor discussed the use of shared mailboxes and in the school they are set up
via Glow.  Each school has a general shared school email account that parents can
use to contact the school.  Access to these accounts is via a shared login and
password.  (action i)
3.21 The schools have other shared mailboxes set up via Glow that are controlled via
distribution lists so if a user is added to the distribution list, they will receive that email
via their own email login and password so shared logins and passwords are not being
used.
218

Page 219

PUBLIC INFORMATION
PUBLIC INFORMATION 
4 Internal Audit Opinion  
4.1 Overall, limited assurance was obtained with regard to the leavers and movers process
in Education.  There are no formal documented processes in place for the removal of
leavers from the IT systems reviewed as part of this audit or for the amendment of IT
access for movers.  Although there is a documented leavers process for AD, this was
not always being followed by all ICT Technicians.    
4.2 It is vital that the new start application developed by IT Services is used by the ICT
Technicians when a new start needs to be set up with AD access and that the relevant
information is provided to the ICT Technicians, preferably in advance of the start date. 
This will allow the automated leavers and movers process to be implemented to
capture any leavers and movers not dealt with via the school leavers and movers
process. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
219

Page 220

PUBLIC INFORMATION
PUBLIC INFORMATION 
KEY FINDINGS AND ACTION PLAN
LEAVERS AND MOVERS PROCESS IN EDUCATION 
Action a
Finding Each of the ICT Technicians were contacted to ask how they are
notified that a staff member is leaving.  This highlighted that there
is an informal process in place with some being notified by email
or word of mouth.  Most are notified by the Education Business
Officer (EBO).  There is no documented formal process of how
the ICT Technicians should be informed a member of staff is
leaving to allow the Active Directory (AD) account to be deleted.  
Action Description A formal procedure document should be prepared documenting
how the ICT Technicians are notified of leavers to allow the AD
account to be deleted on a timely basis and all relevant staff
should be notified of the new process to ensure it is followed.
Risk Leavers continue to have IT access.
Priority (1, 2, 3) 1
Paragraph Reference  3.1
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been instructed to develop a procedure that will be
consistent across all secondary schools to be implemented for the
new session. 
Action b
Finding The auditor tested the ICT Guidance Leavers Procedure that was
implemented as part of a previous internal audit.  This test
highlighted that 6 out of 9 ICT Technicians provided the sample
of leavers forms.  However, in 2 cases the leavers forms were
either completed and/or approved by the Head Teacher
retrospectively. In another case the leavers forms do not record
the leaving date or record when the AD account was deleted.  One
of ICT technicians has not previously completed the leavers form
but will now start using them.  The other 2 ICT Technicians did
not reply or provide the requested information due to being off
sick.
Action Description The ICT Technicians should be reminded to follow the ICT
Guidance Leavers Procedure and to ensure all relevant
information is captured and recorded.
Risk Leavers continue to have IT access. IT access is withdrawn at the
wrong date or from the wrong person causing operational issues
and additional work.
Priority (1, 2, 3) 2
Paragraph Reference  3.2
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Stewart Reid, ICT Coordinator
Due Date 31 August 2024
Management Comment A communication will be issued reminding ICT Technicians to
follow the ICT Guidance Leavers Procedure and to ensure all
relevant information is captured and recorded. 
220

Page 221

PUBLIC INFORMATION
PUBLIC INFORMATION 
Action c
Finding There is no formal process in place to ensure the ICT Technician
is notified of a new start in advance and to ensure the mandatory
information is provided to allow the AD user creation tool to be
used.
Action Description A formal process should be introduced to ensure the ICT
Technicians are notified on a timely basis of all new starts to allow
the AD user creation tool to be used which will ensure the
mandatory information is captured at onboarding stage.
Risk The AD user creation tool cannot be used to set up a new user,
therefore the automated movers and leavers process cannot be
used for that user.
Priority (1, 2, 3) 2
Paragraph Reference  3.3
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been instructed to develop a procedure that will be
consistent across all secondary schools to be implemented for the
new session. 
Action d
Finding The data match identified 28 generic AD accounts.
Action Description The generic AD accounts should be reviewed and deleted where
appropriate. 
Risk Unnecessary generic accounts could be used for unauthorised
access; there is lack of accountability for user actions; there is an
inability to detect who has carried out fraudulent actions.
Priority (1, 2, 3) 2
Paragraph Reference  3.5
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs will be instructed to review and delete, where appropriate,
all generic AD accounts for the new session. 
Action e
Finding Each of the EBOs were contacted about the leavers process for
the SEEMIS system and all of them confirmed they will close the
work records and remove the access for leavers.  The majority
are informed by the Head Teacher and a couple did not specify
who informs them.  Some also receive the resignation letters and
are involved in the recruitment process for the leavers
replacement.  Some advised the leavers are confirmed via email
or verbally.  
Action Description A formal documented procedure should be introduced for the
leavers process to cover how EBOs are notified of leavers to
ensure the work record is closed and access is removed in a
timely manner.  
Risk User access and work records are not updated promptly.
Priority (1, 2, 3) 1
221

Page 222

PUBLIC INFORMATION
PUBLIC INFORMATION 
Paragraph Reference  3.11
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been instructed to develop a procedure that will be
consistent across all secondary schools to be implemented for the
new session. 
Action f
Finding Each of the EBOs were contacted about the movers process for
the SEEMIS system and all confirmed once they are informed of
a change in post, they would amend the SEEMIS access, where
necessary.  Only four of the schools advised they are involved in
the recruitment process which is how they are informed of movers
and 1 advised they are usually informed via email or in person.  
Action Description A formal documented procedure should be introduced for the
movers process to cover how EBOs are notified of movers to
ensure access is amended in a timely manner, particularly when
a promoted post ends and additional access should be removed.  
Risk Access is not appropriate for the new job role; user retains
additional access no longer required.
Priority (1, 2, 3) 1
Paragraph Reference  3.12
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been instructed to develop a procedure that will be
consistent across all secondary schools to be implemented for the
new session. 
Action g
Finding Each of the EBOs were contacted to ask if they carry out periodic
reviews of SEEMIS users.  Only 1 school confirmed they did not
carry out such a review and the other responses varied from once
a year to every 8 weeks.  
Action Description The new formal documented process should advise that a full
review should be carried out at least twice per year.  
Risk Movers or leavers have inappropriate access to SEEMIS.
Priority (1, 2, 3) 2
Paragraph Reference  3.13
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been instructed to develop a procedure that will be
consistent across all secondary schools to be implemented for the
new session. 
222

Page 223

PUBLIC INFORMATION
PUBLIC INFORMATION 
Action h
Finding Auchenharvie and Greenwood Academies have a high number of
users with the Security and/or Office-Security user profiles. 
Action Description Auchenharvie and Greenwood Academies should review the
number of users with Security and/or Office-Security user profiles
to ensure this is restricted to a small number of key staff.
Risk Users have inappropriate access to sensitive data or to make
changes.
Priority (1, 2, 3) 2
Paragraph Reference  3.16
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Carlyn Jamison (Education Business Officer, Auchenharvie and
Lynne Murdoch (Education Business Officer, Greenwood)
Due Date 31 August 2024
Management Comment The EBOs at Auchenharvie and Greenwood Academies have
been instructed to review the number of users with Security and/or
Office-Security user profiles to ensure this is restricted to a small
number of key staff. 
Action i
Finding The auditor discussed the use of shared mailboxes and in the
school they are set up via Glow.  Each school has a general
shared school email account that parents can use to contact the
school.  Access to these accounts is via a shared login and
password.  
Action Description Education should investigate amending access to the schools’
shared mailboxes so that users are not sharing a login and
password.  Individual logins and passwords should be used.
Risk Leavers or movers continue to have access to shared mailboxes
Priority (1, 2, 3) 2
Paragraph Reference  3.19
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager (Resources & Infrastructure)
Due Date 31 August 2024
Management Comment EBOs have been asked to investigate amending access to the
schools’ shared mailboxes so that users are not sharing a login
and password.  Individual logins and passwords should be used. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
223

Page 224

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
PROPERTY ASSET MANAGEMENT 
Assurance Level: Reasonable
Version: Final 
Date: 10th September 2024
Author: Gordon Swinburne
File Ref: 2024-PA-016
Classification: Public
224

Page 225

PUBLIC INFORMATION
PUBLIC INFORMATION 
PROPERTY ASSET MANAGEMENT 
1 Background  
1.1 Property Management and Investment (PMI) manage the Council’s asset portfolio. 
1.2 Scottish councils are required to maintain transparency regarding their assets. The
Community Empowerment (Scotland) Act 2015 mandates that local authorities must
provide information about their land and buildings upon request.  Additionally, following
the 2007 Asset Management Review, all Scottish Government organisations are
required to lodge an Asset Management Plan (AMP) with Facilities and Estates
Services (FES).  These plans should outline the organisation’s office requirements and
aspirations over a 10-year period. 
1.3 The Scottish Public Finance Manual, published by the Scottish Government, stipulates
that asset registers are a crucial part of financial management systems and must meet
the accounting requirements of the HM Treasury Government Financial Reporting
Manual.  This ensures that there is a clear record of all assets, which is accessible for
audit and public scrutiny.   
2 Objectives and Scope  
2.1 The objective of this audit was to assess the process surrounding the management of
property assets to ensure:
• an appropriate control strategy is clearly defined by the Council which is
approved and supported by appropriate staffing and budgets
• that all assets are recorded and maintenance planning is centrally recorded and
monitored
• maintenance of properties maximises lifespan of property assets
• asset disposal achieves maximum value of property 
3 Findings  
CONTROLS 
3.1 Asset management policy documents are current.  The Property Asset Management
Plan (PAMP) 2023 to 2028 is the key public policy document relating to assets.  
3.2 The Computer Aided Facility Management Tribal K2 system records assets.  This
system is currently being replaced. 
3.3 The Service risk register identifies several risks including maintenance compliance,
staffing capability, failure to rationalise assets creating a drain on budgets and lack of
investment in asset management.  To support the management in mitigating these
risks, the service uses a monthly budgeting report, using real time financial information
to measure all related property running costs. 
3.4 The service reports that it hasn’t had a high turnover of staff which supports a more
efficient and consistent approach to maintenance and management of assets. 
225

Page 226

PUBLIC INFORMATION
PUBLIC INFORMATION 
ASSET RECORDS  
3.5 Complementing the PAMP property list, 3 other asset lists were obtained during the
course of the audit. Property services provided a Property Inspection Schedule/Asset
list.  Another copy of the Asset Register was obtained online, and the risk management
team provided their asset insurance spreadsheet.  Cross referencing the data between
all 4 was difficult due to different referencing to index the assets.  (Action a)  
3.6 The PAMP identified 523 property assets by their Uniclass categorisation.  These
categories including historic buildings, offices, educational resources, care,
cemeteries, commercial sports and traveller sites, public conveniences, 7 of which are
Common Good assets.  Housing assets are not included in this list.     
3.7 Cross referencing the Insurance Assets Uniclass categorisation index there was a
considerable difference in assets listed on both registers. A further 8 assets were
identified on the Insurance index that were not listed on the PAMP, 1 of which was a
Common Good asset. (Action b)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      
3.8 The property maintenance asset register identified 1,121 properties not including
housing stock. 
3.9 The insurance register is more comprehensive and in addition to the maintenance
register and the PAMP also covers 13,347 housing properties.  Cross referencing the
information, gaps were identified. 
3.10 Each property on the register should be referenced with a variety of unique identifiers. 
The Unique Property Reference Number (UPRN) is assigned to every address in
Scotland was missing from the registers reviewed.  Additional information including
geographical northing and eastings settings was incomplete.  The service
maintenance and asset register had incomplete property index references assigned
to assets.     
MAINTENANCE PLANNING  
3.11 Maintenance is tracked on an Excel spreadsheet.  Following the COVID period, there
is a backlog on completing property inspection schedules.  Last inspection dates on
the register were incomplete for 861 properties, therefore maintenance compliance
cannot be determined from the information provided. (Action c)  
3.12 The service manages a range of property performance management risks, including
environmental challenges, upgrading and replacing current building stock and plant,
and identifying the need to use external consultants.   
ASSET DISPOSAL 
3.13 Properties for sale are advertised on the internet. At the time of the audit, 2 properties
were for sale and a further 3 development sites were advertised of which 2 were under
offer. 
3.14 There were 78 properties identified as surplus.  These did not include properties
identified in the recent office rationalisation review undertaken by the Council. 
226

Page 227

PUBLIC INFORMATION
PUBLIC INFORMATION 
3.15 Independent third-party overview relating to the disposal of assets is provided by Legal
Services. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to property asset
management with improvements required to the administration supporting
maintenance planning. 
4.2 Prior to moving to the replacement IT system, all existing records are required to be
updated in order for the service to obtain maximum value and usage of the assets and
identify cost effective mitigation of older and failing equipment rendering the asset
unusable.     
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
227

Page 228

PUBLIC INFORMATION
PUBLIC INFORMATION 
KEY FINDINGS AND ACTION PLAN
PROPERTY ASSET MANAGEMENT 
Action a
Finding Inconsistent refencing of data is used within different registers.
Action Description A consistent referencing format be adopted which allows the
service to provide accurate information to all reports that it and
other users require. 
This will also support further extension of the real time information
currently provided by the PMI budget monitoring report.
Risk The services using the data are unable to get accurate information
which may have operational and financial impact on their budgets.
Priority (1, 2, 3) 2
Paragraph Reference  3.5
Managed by Laurence Cree, Head of Service (Sustainability, Transport &
Corporate Property)
Assigned to David Oliver, Team Manager (Assets & Property Rationalisation)
Due Date 31st March 2025
Management Comment A review of all property asset lists currently in circulation will be
undertaken, which will cross-reference the data and update as
required to ensure all asset registers are correct and consistent. 
Action b
Finding Inconsistent register of assets across different reports. 
Action Description Prior to migration of asset data to the new IT system a data
cleansing exercise should be undertaken.  If resources are not
available to achieve this prior to migration, a planned audit of
assets should be timetabled to ensure accuracy of asset register.
Risk Gaps in information will lead to inconsistent use of the data over
different areas of the Council.
Use of data for business information systems will be inaccurate
and lead to poor decision planning.
Priority (1, 2, 3) 2
Paragraph Reference  3.7, 3.10
Managed by Laurence Cree, Head of Service (Sustainability, Transport &
Corporate Property)
Assigned to David Oliver, Team Manager (Assets & Property Rationalisation)
Due Date 31st March 2025
Management Comment As noted above in Action (a), a review of all asset registers will be
completed which will include a full data cleanse exercise to ensure
the information held is correct and consistent. 
228

Page 229

PUBLIC INFORMATION
PUBLIC INFORMATION 
Action c
Finding Maintenance spreadsheet highlights a high number of
outstanding property inspections. 
Action Description Ensure if maintenance inspections have been completed, that
they are recorded on the spreadsheet, if gaps remain then a
prioritised regime is introduced to manage the inspection backlog.
Risk Failure to maintain a regular inspection regime will impact in the
identification of property issues, preventative maintenance and
possible long-term loss of the use of the property.
Priority (1, 2, 3) 1
Paragraph Reference  3.11
Managed by Laurence Cree, Head of Service (Sustainability, Transport &
Corporate Property)
Assigned to David Oliver, Team Manager (Assets & Property Rationalisation)
Due Date 31st January 2025
Management Comment The Property Inspection Schedule is an in-service document
which had been used to monitor all property-related maintenance
activities when the document was first introduced. The processes
have now evolved, including the creation of a new condition
survey programme and so a lot of the information held in the
document is no longer relevant or required. As part of the asset
register review and data cleanse, the Property Inspection
Schedule will be revised to reflect current practices and avoid
reporting inaccurate information. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
229

Page 230

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
HOUSING RENTAL ARREARS 
Assurance Level: Substantial
Version: Final
Date: 18th September 2024
Author: Gordon Swinburne
File Ref: 2024-PA-015
Classification: Public 
230

Page 231

PUBLIC INFORMATION  
PUBLIC INFORMATION 
HOUSING RENTAL ARREARS 
1 Background
1.1 North Ayrshire Council had 13,329 rental properties at 31st March 2024.
1.2 Failure to pay rent on a property can result in eviction from the property. During the
COVID pandemic there was a moratorium on evictions, and with other cost of living
increases creating cashflow issues, some clients failed to keep up with their rent
payments, creating a rental backlog debt to the Council. 
2 Objectives and Scope
2.1 The main objectives of the audit were to ensure that:
• changes in the legal and operational environment are managed.
• financial risks to the council are identified.
• recovery processes are managed.
• legal processes are timely. 
3 Findings 
HOUSING ENVIRONMENT
3.1 An updated version of guidance documents relating to housing rent arrears are
currently being worked on, reflecting current changes in procedure and updated
screens in the Northgate system. (Action a) 
ACTUAL AND TRENDS
3.2 Sample testing on rent arrears was carried out for the financial year periods 2021
through to 2024. No issues were identified.
3.3 The average 2023/24 weekly rent for North Ayrshire is £82.78 compared to the
Scottish average of £84.31.
3.4 Arrears in many cases had increased due to a suspension of evictions during the
COVID period, aligned with cost-of-living increases; many chose to avoid paying rent
to meet other costs. 
ARREARS RECOVERY
3.5 Rent is collected on a fortnightly basis which allows at-risk accounts to be identified
early and interventions to be made. A wide range of guidance regarding rent arrears
and support available is provided in various media both printed and online.
3.6 Housing officers report that contacting clients is, at times, difficult and they are
currently trialing the use of texts in the Three Towns Housing Office.
231

Page 232

PUBLIC INFORMATION  
PUBLIC INFORMATION 
LEGAL INTERVENTIONS
3.7 Legal Services are instructed by Housing Services, if no repayment plan can be
agreed or adhered to, to process evictions through the Sheriff Court. Tracking
information is shared between both services using a dedicated Teams group and
SharePoint site.
3.8 Considerable changes in the court processes since COVID mean that these processes
are now more time consuming. Cases are now submitted to the court on an individual
basis whereas prior practice was paper based and allowed multiple applications to be
submitted at the same time. The submitting of cases and all subsequent
correspondence with the court is via email.
3.9 Value for money of the recovery process requires some cut off limits to be set. The
maximum amount that a social landlord can recover through the Summary Cause
Recovery of Heritable Property process is £5,000 plus expenses/outlays (if granted by
the Sheriff) and any arrears under 4 weeks are not submitted for recovery via the
Sheriff Court. 
4 Internal Audit Opinion
4.1 Overall, substantial assurance was obtained with regard to management of rent
arrears.
4.2 Cost of living costs will continue to impact on renters and early interventions to support
them to maintain their homes will be important. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited. 
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited. 
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited. 
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.
232

Page 233

PUBLIC INFORMATION  
PUBLIC INFORMATION 
KEY FINDINGS AND ACTION PLAN
HOUSING RENTAL ARREARS
Action a
Finding Guidance procedure documents are out of date and currently
being updated.
Action Description The service should ensure that updates to guidance procedure
documents are completed timeously.
Risk Localised practices can be established and used to train new
starts thereby correct procedural processes are not followed and
mitigating remedial action is delayed.
Priority (1, 2, 3) 2
Paragraph Reference 3.1
Managed by Yvonne Baulk, Head of Service (Housing and Public Protection)
Assigned to Craig Leitch, Area Housing Manager
Due Date 31st October 2024
Management Comment The updates to the guidance procedure are in progress and will
be completed by 31 October 2024. The guidance procedure will
be monitored and reviewed regularly through the rent arrears
working group. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
233

Page 234

234

Page 235

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee
Title: Internal Audit and Corporate Fraud Action Plans:
Quarter 2 update
Purpose: To advise the Audit and Scrutiny Committee on the progress
made by Council Services in implementing the agreed actions
from Internal Audit and Corporate Fraud reports as at 30
September 2024.
Recommendation: That the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions;
and (b) challenges those Services that have not implemented
actions within the previously agreed timescales. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in Scotland'
highlights that Audit Committees should monitor and review the progress made in
implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented. This provides
assurance that identified control weaknesses have been addressed and are being
managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action. This enables Internal
Audit to monitor progress on a 'real-time' basis and address any delays in
implementation. 
1.4 This report details the position as at 30 September 2024. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 29 August 2024 highlighted
that there were eight actions outstanding at the end of June 2024: in all eight cases
the due date had not yet passed.
Agenda Item 14
235

Page 236

2.2 In addition to these eight carried forward actions, there have been 24 new
actions agreed, giving a total of 32 action points for review.
2.3 Services have completed 20 actions since the last report. All Council Services are
required to retain evidence of work carried out in completing their actions and Internal
Audit carries out 'spot-checks' on a sample of completed actions on an ongoing basis. 
2.4 Of the remaining 12 actions, one had either not started or was only partially complete
at 30 September 2024 and the remaining 11 actions were not due for completion until
after that date. 
2.5 Appendix 1 to this report provides the Committee with full details of the one action
that was not completed within the agreed timescales. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and (b) challenges
those Services that have not implemented actions within the previously agreed
timescales. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud actions
helps to support the efficient delivery of the strategic priorities within the Council Plan
2023-2028.
236

Page 237

Community Wealth Building
4.7 None.
5. Consultation
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.
237

Page 238

4 
Appendix 1 - Actions due by 30th September 2024 but not started or partially complete 
Code CFT5457B Description
Action Description - A management control should be put in place to check the
approved funded placements to prevent any being awarded under incorrect
circumstances. 
Risk - No segregation of duties; Errors, incorrect awards and refusals occurring without
detection; Reputational risk to the Council; Lack of control and accountability over the
use of public funds. 
Priority 2 Latest Note
The Early Years Senior Manager is undertaking work to explore the possibility of using
current systems within the Council. This will be decided in the next month and if unable
to use the same systems, there is a plan for an Early Years system to be put in place
which ensures that there are stringent Quality Assurance checks and controls at all
steps of the process. Expected completion date 30/11/24.    
Progress Bar  Original Due Date 31-Jul-2024 Due Date 31-Jul-2024
Parent Code & Title CFT5457 Falsifying Documents To Obtain A Funded Placement For An Eligible 2 Year
Old
Managed By Andrew McClelland
Assigned To Kathleen McCormick 
238

Page 239

NORTH AYRSHIRE COUNCIL 
31 October 2024 
Audit and Scrutiny Committee
Title: Strategic Risk Register 2024/25: Mid-year Update
Purpose: To provide the Audit and Scrutiny Committee with an
update on the progress with actions related to the Strategic
Risk Register.
Recommendation: That the Committee notes the mid-year update on the
2024/25 Strategic Risk Register. 
1. Executive Summary 
1.1 The Council’s most significant risks are identified through the Strategic Risk
Register, which is refreshed annually and was last approved by Cabinet in
March 2024. 
1.2 This report, together with Appendix 1, demonstrates progress made by the
Council in mitigating against the potential impact of the strategic risks. 
2. Background 
2.1 The Council’s most significant risks are identified through the Strategic Risk
Register, recognising the challenges facing the Council within the current
financial year and demonstrating the arrangements in place for managing those
risks. 
2.2 The Strategic Risk Register is refreshed annually and was last approved by
Cabinet in March 2024; thereafter it was reported to the Audit and Scrutiny
Committee in May as this Committee has a remit for monitoring key risks. 
2.3 The register is attached at Appendix 1 and provides an update on that approved
by Cabinet in March. The next full refresh of the risk register will take place
early in the new year, to be taken to Cabinet for approval in March 2025 and
thereafter reported to the Audit and Scrutiny Committee. 
2.4 Where relevant, key actions from the Council Plan have been linked to the risks
and progress shown at the end of September. These actions are more strategic
in nature. Some risks are managed as ‘Business as Usual’, through the
appropriate operational plans within Services or through current controls. 
2.5 Of the eight strategic risks presented to Cabinet in March two have increased
in scoring. Inequalities has increased from 16 to 20 due to increasing risk
proximity factors around Community Asset Transfer.  Financial Sustainability of
the Health and Social Care Partnership has also increased from 16 to 20 as a
result of increasing financial pressures on the partnership. 
Agenda Item 15
239

Page 240

Very High Risks 
2.6 There are five strategic risks classed as ‘Very High’ (scoring 17-25):
Financial Environment (risk score 20) – this risk reflects the ongoing financial
challenge faced by the Council. 
Inequalities (risk score 20) – this highlights the socio-economic inequalities
faced in North Ayrshire. 
Financial Sustainability of the Health and Social Care Partnership – this
reflects the ongoing financial challenges faced by the Partnership and the risk
these present to the Council (risk score 20 - up from 16 in March 2024). 
Property Asset Risk – This reflects the impact of long-term restricted budgets
on the Councils ability to maintain these to a good standard (risk score 20). 
Community Capacity Building and Empowerment – this highlights the
challenges associated with community empowerment (risk score 20 – up from 16
in March 2024). 
High Risks
2.7 There are three strategic risks classed as ‘High’ (scoring 10-16):
Cyber Security (risk score 16) – this reflects the ongoing risk from external
cyber-attack which is being faced by all organisations.
Climate Change (risk score 16) – this risk has been on the Strategic Risk
Register following the declaration by the Council of a Climate Change
Emergency during 2019. 
Transformation (risk score 12) – this reflects the wider risks associated with
delivering the current Transformation Programme and developing a pipeline of
future initiatives. 
Longer-term risks and horizon scanning
2.8 The Strategic Risk Register identifies the most significant risks which the
Council faces at the present time. 
2.9 The Corporate Risk Management Group identifies any new relevant risks
though internal reviews and external horizon scanning utilising a number of
sources. 
3. Proposals 
3.1 It is proposed that the Committee notes the mid-year update on the 2024/25
Strategic Risk Register. 
4. Implications/Socio-economic Duty
Financial
4.1 The Council continues to have a robust long and medium-term financial
planning framework. Key strands include development of key transformation 240

Page 241

themes and the establishment of an Investment Fund that will generate future
savings alongside delivery of a number of key Council priorities.
Human Resources 
4.2 None. 
Legal
4.3 None.
Equality/Socio-economic
4.4 The risk to the Council is that North Ayrshire residents, and in particular certain
groups, will experience increasing levels of poverty and its effects. Current
control measures fall into two categories - measures to address the root causes
of socio-economic inequalities - income through employment or benefits – and
mitigation measures to minimise the impacts of poverty. 
Climate Change and Carbon 
4.5 The Council has declared a climate change emergency and has in place an
Environmental Sustainability and Climate Change Strategy. Significant work to
help mitigate the risk of flooding is included within the Capital Plan. The Council
is undertaking an ambitious renewable energy programme. 
Key Priorities 
4.6 A successful risk management framework helps to underpin the delivery of the
Council’s strategic priorities in the Council Plan 2023-2028.
Community Wealth Building
4.7 The Council has an ongoing commitment to community empowerment and
locality partnerships, together with an enabling approach with community
partners and support with third sector interface to build capacity and identify
opportunities for growth and sustainability. 
5. Consultation 
5.1 The Strategic Risk Register has been reviewed in consultation with the
Executive Leadership Team. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit,
Fraud, Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None
241

Page 242

Appendix 1 - Strategic Risk Report 2024/25 
Risk Code SRR2425_R01 Risk Title Financial Sustainability Latest Note Date 11-Sep-2024
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The risk is that the level of funding from Scottish Government
to local government falls significantly below the level required
to operate services effectively. This will require the Council to
take increasingly difficult and challenging decisions. The
revised 2024/25 local government settlement represents a
reduction in core funding of £0.5m (0.15%). This is against a
backdrop of significant inflationary cost increases and risks. 
The North Ayrshire position is further affected by a reducing
overall population demographic and a growing elderly
population. This will further impact the Council’s share of
funding across the short, medium and long term.
Although there is a commitment through the Verity House
agreement for Councils and Scottish Government to work
together there continues to be challenges around the level of
flexibility the Council has on key areas of Budget, most notable
in areas like HSCP funding and funding for teachers and
support staff, where conditions remain. In 2024/25 in-year cost
pressures across the Council’s General Fund and the Health
and Social Care Partnership present a significant risk to the
sustainability of the Council’s finances. The General fund
currently projects an in-year overspend of £2m and the HSCP
projects a £6.5m overspend. The Scottish Government has
passed legislation to give Councils powers to charge additional
council tax for second homes. This is an area the Council will
consider within the context of local circumstances and island
communities.
Scottish Government funding to support the Council’s capital
programme has also been reduced by almost 10% in the
Budget settlement for 2024/25. Set against high inflationary
driven construction costs there is a risk that the 10-year capital
programme will be unaffordable. This could require projects to
be reduced in scale or even ceased.
Funding not keeping pace with demand
and inflationary cost pressures means that
there will be a reduction in some service
areas potentially resulting in higher risks for
service users. The future delivery of
balanced budgets will become increasingly
challenging. The capital programme could
also be significantly impacted leading to
reduced levels of capital investment.
Robust monitoring of the Council’s revenue and
capital budgets is in place as well as regular
reporting of financial performance of the IJB to
Cabinet and Audit and Scrutiny. 
To assist financial planning The Medium and Long-
Term Financial Outlook (LTFO) to 2033/34 was
approved at Council on 13 December 2023 – this is
the cornerstone of the Council's financial planning in
the medium to long term. 
The annual budget process for the General Fund
revenue and Capital Programmes and financial
performance monitoring process will continue to
provide the framework from which control measures
will continue in addressing the financial position.
Delivery of the Council’s Change Programme is also
vital in addressing the Budget challenges and this is
being progressed by the Council’s Transformation
Board, which is chaired by the Chief Executive.
Utilising the Council’s available statutory powers is
another important area in addressing the financial
challenges.
4 5
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Increasing Risk 20 
242

Page 243

Strategic Risk Action Plan Date Updated 11-Sep-2024
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
Regular financial monitoring of Revenue and Capital Budgets.
09 February 2024:
Ongoing monitoring. 
11 September 2024:
Ongoing financial monitoring process across capital and revenue, including
identification of measures to address in-year position
31-Mar-2025 Mark Boyd 
Maintain Financial Governance Arrangements for IJB.
09 February 2024:
Under ongoing review.
11 September 2024:
New Finance Working Group set up to address in-year and medium-term
pressures. Includes representation from the HSCP, Health and the Council,
Main focus is on development of a finance recovery plan.  
31-Mar-2025 Mark Boyd 
Progress dialogue via COSLA with Scottish Government on a range of
areas including fair funding, multi-year settlements, reduction in levels of
ring-fenced resources, true costs of SG policy areas, financial flexibilities
and a New Deal partnership with SG and local government.
09 February 2024:
Ongoing discussions via COSLA around the Verity House Agreement and the
need for maximum financial flexibility for Councils.
11 September 2024:
Discussions ongoing, however, SG have just announced £0.5Billion of cuts
Further dialogue being progressed around teacher number restrictions and
areas of revenue generation. 
31-Mar-2025 Mark Boyd 
Develop the 2025/26 to 2027/28 revenue budget (medium-term financial
strategy) and capital programme taking account of all pressures and
savings via Directorates and Transformation programme.
09 February 2024:
Options to address the £16m Budget gap for 2024/25 have been developed
for elected member consideration at Council Meeting on 28 February 2024.
Following this, require to develop a more detailed programme of options to
address the structural funding challenges over the medium and long-term.
11 September 2024:
The 2025/26 Budget process has commenced earlier, in view of the current
financial challenges. Special Council meeting arranged for 9 October, 2024 to
set out the financial outlook and outline initial proposals as part of a
community engagement programme to commence from 10 October, 2024.
26-Feb-2025 Mark Boyd 
243

Page 244

Risk Code SRR2425_R02 Risk Title Inequalities Latest Note Date 19-Sep-2024
Risk Owner Caroline Cameron; Sam Anson; David Hammond
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
North Ayrshire residents, and in
particular certain excluded
groups, will experience
increasing levels of poverty and
its effects, as a result both of the
economic situation and further
public sector funding
challenges.
Health inequality is closely
linked to poverty, employment
and people's earliest
experiences as children, and will
increase.
The population of North Ayrshire
is projected to fall over the next
10 years but there will also be a
larger proportion of the
population considered
dependent (not economically
active).
The impact on specific risk
groups is greatest for our
children, young people and
families, unemployed people
and those in in-work poverty
and people exposed to the
risks of drug and alcohol
addiction.
Demand for HSCP and
Council Services will
increase.
As reductions in resources
increase, early intervention
and prevention activities are
at risk, thus increasing the
potential for an increase in
costly crisis interventions.
The local economy will be
impacted by reduced
spending power by
economically inactive
residents.
The HSCP re-affirmed its commitment to Tackling Inequalities by continuing to consider it a key priority with the
Partnership’s Strategic Plan.
Through the HSCP strategic plan, the Partnership sets out actions to tackle inequality through its Partnership Pledge and
across its strategic priorities. Tackling inequalities is addressed across HSCP service areas. An example of actions to
help address local inequalities include:
Establishing the Money Matters service in 9 GP practices and 7 local schools in the more deprived areas of North
Ayrshire. This will improve accessibility of the service to those who would benefit most. Building on this approach through
the launch of the Financial Inclusion Partnership bringing a range of key partners and stakeholders together to improve
access and support for the most vulnerable NA residents.
Increase the number of employability mentors in Justice Services, to support those with experience of the justice service
into meaningful employment or training opportunities and to help divert away from criminal behaviours.
Working closely with Housing colleagues to support transitions from care and ensuring care experienced young people
can access a positive and stable housing destination.
In our Drug and Alcohol Services, we are implementing actions to reduce the number of local drug and alcohol related
harms and deaths. This includes implementing the national MAT (Medicated Assisted Treatment) standards and
increasing the number of ABIs (Alcohol Brief Interventions) delivered across North Ayrshire.
Through the Caring for Ayrshire programme, we have set out a phased approach to improve local primary care premises
(GP Practices and Health Centres). This will improve overall professional capacity within GP practices for Multi-
Disciplinary Teams, ensuring the right support is available for local people with health concerns.
Investment in early intervention teams and approaches in Children’s Services to support vulnerable families, including in
Child Protection and Whole Family Support.
The Council considers reducing inequalities to be at the heart of its work.
The Communities & Housing Directorate leads the Community Planning Partnership for the Council and the CPP has
recently developed a new Local Outcomes Improvement Plan, the purpose of which is reducing inequalities. The themes
are Wellbeing, Work and World, the latter addressing climate change and fuel poverty. Locality Planning priorities and
Community Investment Fund funded initiatives are also focused on a range of inequalities, including poverty, age-related
inequalities and digital inequalities. Recent CIF-funded projects have focused on employability, addictions and community
food.
Sam Anson, Executive Director (Education) and David Hammond, Executive Director (Communities & Housing) lead the
work of the Child Poverty and Cost of Living Board, chaired by the Council Leader. The five strategic themes of the Board
to date have been:
• No Wrong Door – access to services
• Employability
• Food
• Islands
• Childcare 
Work to address child poverty and the Cost-of-Living crisis includes a range of employability initiatives to support parents
and people with disabilities, each of whom are Scottish Government priority groups.
Progress has been made with partners to undertake a review of the Child Poverty & Cost of Living approach, with
recommendations being finalised for consideration by the Board.. This is supported by the data and Single Shared
Assessment projects being developed by the Transformation team, to provide holistic support for residents who need it
most. Confirmation was received in September 2024 that the Council will be supported with additional Scottish
Government funding for Fairer Futures project funding which will enable the creation of three additional posts to provide
strategy capacity to support the CPCOL Board.
The Child Poverty Early Intervention Fund is being used to address gaps in current planning and provision. Recent
funding decisions have been made, as a consequence of the mini-enquiries - to support employability and travel,
childcare developments and support for care experienced young people and families. Further allocations are currently
under consideration with the Board. 
The Scottish Government has provided a second year of funding to address inequalities on the islands. This has been
used to fund energy support, welfare advice and support, third sector interventions and school activities.
The commitment to reducing inequalities is also reflected in the following plans:
5 4
244

Page 245

• The Educational Service Improvement Plan
• Connected Communities strategic plans and
• Facilities Management plans.
Examples of actions to reduce inequalities:
• Deployment of Scottish Attainment Challenge funding to reduce the poverty related attainment gap in schools
• Use of the Pupil Equity Fund to ensure equity of pupil experience in schools, at the discretion of head teachers
• Cost of the School Day actions to reduce, for example, the cost of school uniforms and clothing, food and outings
• Support for care experienced young people, both in schools and through youth services
• Additional national and local investment in Active Schools to focus on inequalities and equity
• The Fairer Food Network, with 14 community larders which support the needs of individual communities
• A network of warm spaces and events to mitigate energy use and social isolation
• Work to support “New Scots,” in schools, with families and in community settings through language support and
capacity building, including women’s groups
• LGBT support groups for young people and those over 18
• Mentoring support for young people in secondary schools through a partnership with MCR Pathways
Participation strategies for children and young people and adults to ensure our strategies and investment are informed by
as wide a range of views as possible.
Status Risk Score
Heat Map 
Change in Score Approach
No Change Treat
Stable 20 
245

Page 246

Strategic Risk Action Plan Date Updated 19-Sep-2024 
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG
Global and national conditions which affect the cost-of-living and poverty continue
to undermine the effectiveness of local control measures. Substantial work
continues to mitigate inequalities but child poverty data, for example, continues to
show an increase. National data collection methodologies have changed which
explains the change in part, but North Ayrshire continues to have c. 29% of
children living in poverty.
Although unemployment has reduced, it continues to be a driver of poverty, with
in-work poverty a key factor.
Access to benefits is a key driver of poverty and the range of strategies described
above continues to ensure we are maximising access to entitlements. The Single
Shared Assessment work will improve this.
19 September 2024:
The wide range of strategies and initiatives described above,
being further developed and implemented, is anticipated to make
a significant contribution to a range of inequalities. The review of
the CPCOL Board, Child Poverty & Early Intervention Fund, Fairer
Futures funding, and single shared assessment project are
designed to help ‘shift’ the dial in tackling inequalities.  
Actions are being progressed and remain within the target dates
for completion.  
31-Mar-2025  Caroline Cameron 
246

Page 247

Risk Code SRR2425_R03 Risk Title Financial Sustainability of the Health and Social Care Partnership Latest Note Date 18-Sep-2024 
Risk Owner Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Resources have not kept pace with the demand for and
cost of social care services. The budget settlement for
2024-25 is extremely challenging with a gap of over
£10m across the IJB. Financial modelling suggests
significant ongoing challenges across the medium-term.
There is no certainty around future funding against
growing demand, increasing costs and demographic
pressures, with one-year budget settlements remaining
in place.
The ongoing work to review the Integration Scheme and
to develop new risk-sharing arrangements between the
Council and Health Board in relation to the acute set
aside and primary care prescribing present a financial
risk to the Partnership.
The Partnership is projecting an overspend of £6.7m in
2024/25, reduced to £3m following the identification of
cost reduction measures and the utilisation of the
remaining general balance of £0.357m.
Funding levels could result in
savings being made that are not
in alignment with the strategic
plan. This could impact on the
future demand levels e.g.
reduction in early intervention
and prevention means that
future demand is increased. 
An in-year overspend position
impacts on financial reserves
and ultimately poses a financial
risk to the Council and NHS
Board as funding bodies. 
Funding levels increase the
requirement to transform
services at scale and pace.
The IJB actively monitors the financial position with regular detailed
reporting. Directors of Finance of the Council and Health Board have
oversight and regular updates are provided to the Council's Cabinet.
There is an integrated approach to managing the totality of NHS and
Council resources delegated to the IJB. A three-year Medium-term
Financial Outlook is updated on a rolling basis each year.
Previous financial settlements have seen both partners meet the
Scottish Government settlement conditions with any additional
resources passed to the IJB.
The Partnership has developed a new 3-year Transformation Plan
2024-2027 which will be approved by the IJB in March 2024. There is
£2.2m of earmarked reserves set aside to support service change and
re-design.
4 5
Status Risk Score
Heat Map 
Change in Score Approach
Increase from 16 to 20 Treat
Increasing risk 20 
247

Page 248

Strategic Risk Action Plan Date Updated 18 Sep-2024 
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG
Budget Monitoring - Regular budget monitoring reports to IJB are effective. 
06 February 2024:
Budgets are closely monitoring by the finance team in conjunction
with budget holders to enable corrective action to be taken and
regular in-year budget monitoring reports are presented to the
IJB.
18 September 2024:
Strengthen support from Finance Team to front line services and
increased engagement with Heads of Service and Senior
Management Teams, including line by line reviews of all budget
areas. Review and enhancement of frequency and level of
financial information provided to support oversight and decision
making in line with financial constraints, with an added focus on
areas of underspend to maximise opportunities to delay or stop
spend and contribute to the overall financial challenge.
31-Mar-2025
Caroline
Cameron;
Paul Doak 
Corrective Action – Transformation Board is effective  
06 February 2024:
A three-year Transformation Plan covering the period 2024-2027
will be approved by the IJB in March 2024. This focusses on
addressing the future financial challenge in a sustainable way, as
well as reviewing service delivery models and implementing local
and national priorities.
18 September 2024:
A three-year Transformation Plan covering the period 2024-2027
was approved by the IJB in March 2024. This focusses on
addressing the future financial challenge in a sustainable way, as
well as reviewing service delivery models and implementing local
and national priorities. 
31-Mar-2025
Caroline
Cameron;
Paul Doak 
Enhanced Financial Controls
18 September 2024:
Establishment of a Budget Working Group to facilitate increased
oversight and scrutiny of the financial position and transformation
programme as well as detailed budget planning for future financial
years. The first meeting took place on 9th September.
Review of expenditure authorisation levels across the Partnership
and escalate specific decisions to senior officers.
Staff communication in relation to discretionary/non-essential
spend.
Review of temporary posts and robust vacancy
management/approval – only essential frontline posts will be
approved for recruitment.
Strengthen across services the existing approval and prioritisation
approaches for new care requests, which will be approved in line
with resource availability. A new group has been established to
sign off all higher value care packages (Over £40k)
31-Mar-2025
Caroline
Cameron;
Paul Doak 
248

Page 249

Risk Code SRR2425_R04 Risk Title Cyber Security Latest Note Date 13-Sep-2024 
Risk Owner Fiona Walker
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The potential compromise of business operations or a
data breach orchestrated via either digital channels or
the IT infrastructure. This can include targeting of the
user base. Risk derives from both Council operations
and those of its supply chain. 
The increasing importance of delivering services through
digital channels and maximising efficiency through
effective and secure use of technology. This includes a
growing adoption of cloud-based computing resources
which extend processing capabilities, and associated
risks, beyond the Council’s network. 
Hybrid remote and mobile working is now the normal
working practice for over 3,000 staff. Such a distributed
work force increases the complexity of protecting against
cyber and data protection risks. 
Failure by Services to adopt and comply with
strategies, policies and procedures may result
in a failure to adequately ensure the desired
levels of cyber-security required to maintain
and protect council systems and data. 
There may be a significant impact on the
authority through the release of personal
and/or sensitive information resulting in a loss
of public confidence and significant financial
loss incurred through fines and service
disruption. 
A successful cyber-attack (malicious external
or internal action) on the Council’s IT
environments could also result in significant
service disruption, loss of income streams
and possible data loss/exposure. 
Impacts of a cyber-attack could include
economic (i.e. inability to collect online
payments), societal disruption (i.e. loss of
diaries and client appointments), and
reputational damage (i.e. loss of public
confidence in digital services).
It is recognised that it is not possible for any
organisation to expect to be completely protected
against continually evolving cyber threats. A threat
actor with sufficient motivation, resource and capability
will be able to compromise the most secure system. 
The Council takes a sociotechnical approach to
reducing risk by continually developing protective
measures through technical, organisational and
people-focused controls. 
Technical controls are implemented in areas such as
network defences, secure configuration of systems,
user authentication, malware protection, and
vulnerability management. These are based on best
practice and independently tested on an annual basis
to confirm their effectiveness in accordance with
compliance schemes. 
The Council maintains a comprehensive set of policies,
standards, guidelines, metrics and reporting
mechanisms as part of its information security
governance structure. A comprehensive training and
awareness programme is delivered to nurture a cyber-
aware workforce and culture.
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
249

Page 250

Strategic Risk Action Plan Date Updated 13-Sep-2024
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
Incident Detection and Response – Recent cyber-attacks on public
sector organisations highlight the need for robust incident detection and
response procedures and technologies. The current response
procedures been shown to be effective based on incidents experienced
so far, however detection capabilities will need to be reviewed and
improved.
17 January 2024:
A joint procurement of a Managed Security Operation Centre (SOC) service with
other local authorities is being taken forward by the Digital Office.  This has
however been delayed due to resource challenges and to date no procurement
timescales have been set.
Given the delays to the national SOC procurement project, the Council will consider
other SOC alternatives and Manage Detect & Response (MDR) services.
13 September 2024:
Progress on the Digital Office joint procurement exercise has remained extremely
slow, as a result the Council have opted to procure a SOC/MDR service
independently.  The procurement exercise is now progressing. 
31-Mar-2025 Fiona Walker 
Training and Awareness
17 January 2024:
Cyber Security in person training has resumed with multiple sessions being
organised to tackle the backlog incurred due to the pandemic.
The Cyber Security Essentials E-Learning course is a mandatory training
requirement for all staff with access to Council digital resources. Staff are also
encouraged to complete this annually. In addition, the course has been converted
into a briefing to provide as a toolbox talk to reach all of our workforce.
Phishing simulations continued to be hosted to test the effectiveness of training and
raise awareness.
13 September 2024:
Cyber Security training continues to be delivered; however this is now a Teams
delivered course to maximise the attendance numbers.  The Cyber Security
Essentials E-Learning course continues to be available for 2024 and is undergoing
a full re-write for 2025 to ensure this remains current. This training is being
supplemented with a programme of awareness raising initiatives including
educational staff news items and webinars. 
Phishing simulations have continued in order to assess the effectiveness of existing
training and further increase awareness.
Ongoing Fiona Walker 
250

Page 251

Risk Code SRR2425_R05 Risk Title Transformation Latest Note Date 11-Sep-2024
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
There is a risk that transformation and change
activities, which are core to the future delivery
models and long-term financial sustainability of
both the Council and Health and Social Care
Partnership, fail to deliver at the level of scale
and pace required.
Failure to deliver transformational change
will impact on the Council’s financial
sustainability, effectiveness of service
delivery and delivery of the outcomes set
out in the Council Plan 2023-28 and the
Local Outcome Improvement Plan (LOIP). 
Failure to deliver the HSCP
Transformation programmes across the
Partnership, involving North Ayrshire
Council (NAC) and NHS Ayrshire & Arran
(NHSAA) services may lead to the
identified outcomes not being delivered;
resulting in financial instability, reduced
performance, deteriorating patient
outcomes, and reputational damage
within North Ayrshire Health and Social
Care Partnership (NAHSCP). 
Failure to embed cultural transformation
activities may lead to difficulties in
building future workforce capacity and in
ensuring we have an engaged, skilled
and knowledgeable workforce to meet
service demand.
The transformation programme aligns to the Council Plan and is
monitored via the Transformation Board. The Board is chaired by the
Chief Executive.
Workstreams have been developed across Transport and Travel,
Digital, Land and Property assets, Sustainability, Financial Inclusion
as well as ongoing reviews across Waste Services, ELC, Learning
Resources and Housing. 
HSCP have an established Transformation Board to closely monitor
progress with plans, regular updates on programme to the IJB and
regular meetings with the Chief Executive and S95 Officer to review
progress and mitigation plans. Cultural transformation activities
continue to evolve to support the Council’s transformation and
improve effectiveness and capability. This includes sharing learning
and skills, engagement, design experiments and a whole systems
approach to transformation and change. 
Our workforce planning approach utilises a variety of tools and
techniques, such as career development, succession planning,
vacancy management, redeployment and early release schemes to
ensure our workforce requirements for the future, in terms of skills
and capabilities, are planned. Each Head of Service has a workforce
plan, and these are monitored six-monthly with continued HR
support and guidance to ensure service review and redesign of the
workforce is on track.
3 4
Status Risk Score
Heat Map  
Change in Score Approach
No Change Treat
Stable 12 
251

Page 252

Strategic Risk Action Plan Date Updated 11-Sep-2024
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
Existing project level governance and controls remain effective and are
constantly reviewed.
25 January 2024: 
Progress on Transformation projects continues to be governed and
monitored via the Transformation Board which is chaired by the
Chief Executive. Meetings held quarterly Workstreams have been
fully developed and progress and all actions tracked. Financial
efficiencies across commercial property, waste review, learning
resource review, ELC review and the sustainability programme have
been fed into the Council’s Budget programme for 2024/25 to
2026/27.
11 September 2024:
Programme continues to be developed and work being progressed
to feed a pipeline of financial efficiencies into the Budget programme
for 2025/26.
Quarterly
Mark Boyd / Chief
Executive and
Executive Directors 
Review current governance arrangements and project delivery in view of
land and property workstream to seek optimal delivery aligned to the
council’s net zero ambitions.
25 January 2024:
Key progress made around Irvine Based locality property Review.
Next stages to present Cabinet Paper in March 2024 to consider
plans. 
11 September 2024:
Governance arrangements in place and property programme being
progressed. This will feed into the 2025/26 Budget programme.
26-Feb-2025
Mark Boyd / Chief
Executive and
Executive Directors 
252

Page 253

Risk Code SRR2425_R06 Risk Title Climate Change Latest Note Date 20-Sep-2024
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Climate change is expected to continue and
worsen in the future if no action is taken,
with increases to mean global temperatures,
sea level rises and the increasing frequency
and severity of weather events such as
floods, heatwaves, droughts and storms. 
More frequent and intense heavy rainfall
events increase the risk of soil erosion and
flooding. 
Rises in mean sea level increases risks of
coastal erosion, flooding, saltwater intrusion
and soil salinisation (risk to agricultural land
and freshwater habitats). 
Severe weather is already affecting public
services across Scotland, with operational,
reputational, financial and legal
consequences. 
There is also an ongoing impact of severe
winter weather including snowfall and
freezing temperatures which impact service
delivery and the integrity of our roads open
space and buildings infrastructure. This shift
in weather patterns caused by climate
change is also affecting biodiversity across
Scotland.
Increased frequency of severe weather
conditions and flooding events may lead to
more instances of damage to Council
infrastructure and property, interruptions to
service delivery and increased demands on
services, often with little notice. 
Risk to life, transport disruption and
pollution to the local environment, as well
as impact adversely on the local economy
if businesses are unable to operate. 
Council requirement to provide immediate
response and manage the adverse effects
of more frequent and severe weather
emergency situations, including support to
local communities and businesses. 
The Council is required to comply with the
‘Public Bodies Climate Change Duties’
under the Climate Change (Scotland) Act
2009. These duties require the Council to
assess the risks, threats and opportunities
associated with climate change and identify
actions to increase resilience to climate
change.
North Ayrshire Council declared a Climate Emergency in June 2019, committing
to act on climate change and reduce carbon emissions. In January 2020 the
Council approved the target to become net-zero carbon by 2030, for both Council
estate emissions and area-wide emissions.
Following implementation of the Council’s third Environmental Sustainability and
Climate Change Strategy (2021-23), Cabinet approved the new Sustainable North
Ayrshire Strategy (2024-27) in December 2023. This strategy provides a road map
to achieve the net zero carbon emissions by 2030 target. 
There are 5 workstreams within the Sustainable North Ayrshire strategy, namely
Energy, Nature, Transport, Waste and Adaptation. We continue to utilise
Adaptation Scotland’s Capability Framework to ensure North Ayrshire takes a
strong, proactive approach to adapting to climate change.  Officers are
participating in the Sustainable Scotland Network’s ‘Adaptation Scotland
Benchmarking Group’ to learn and share best practice with other local authorities.
Adaptation actions are identified within the Ayrshire Flood Risk Management Plan
(2021), the Ayrshire Local Flood Risk Management Plan (2022), the Ayrshire
Shoreline Management Plan and in the Adaptation Capability Framework.
Flood studies are undertaken to help the Council identify areas that are at risk of
flooding and to appraise options to reduce flood risk to communities and
infrastructure.
In addition, actions to mitigate Climate Change risk are held within strategies such
as the Core Paths Plan, Outdoor Access Strategy, Local Biodiversity Action Plan,
and Weather and Winter Emergencies Plan. Asset management plans are in
place which are regularly reviewed for our Roads, Fleet, Housing, Property and
Open Spaces. 
Furthermore, through the Ayrshire Civil Contingencies Team there are emergency
planning arrangements in place in the event of severe weather and flooding
conditions causing major disruption and damage to the area or to individual
communities within it.
4 4
Status Risk Score
Heat Map 
Change in Score Approach
No change Treat
Stable 16 
253

Page 254

Strategic Risk Action Plan Date Updated 20-Sep-2024
Analysis of Effectiveness of Controls Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG
Reducing Carbon Emissions:
North Ayrshire Council declared a Climate Emergency in June
2019, committing to act on climate change and reduce carbon
emissions. In January 2020 the Council approved the target to
become net-zero carbon by 2030, for both Council estate
emissions and area-wide emissions.
The Council has taken action against climate change since our
first Carbon Management Plan in 2006/07, by working to reduce
emissions associated with Council services, and using the
baseline year of 2005/06 from which to measure progress.
Since the baseline year of 2005/06, Council estate emissions
have reduced by 67%, from 63,334 tonnes of carbon dioxide
equivalent (tCO2e) to 20,745 tCO2e. Area-wide emissions are
published by BEIS. Current records show total emissions have
reduced across North Ayrshire by 42.6%, from 1,454 kilo-tonnes
of carbon dioxide (ktCO2) in 2005 to 835 ktCO2 in 2019.
To ensure North Ayrshire Council can develop a leading, cross-
sector and community led approach we established a Climate
Change Steering Group (CCSG) in 2021. The CCSG is chaired
by the Cabinet Member for Green Environment and Economy,
and brings together young people, local businesses and
community organisations from across North Ayrshire.
Existing controls remain effective and are under review as our
response to climate change develops and we progress towards
achieving net zero by the 2030 target. 
8th February 2024:
Implementation of the Sustainable North Ayrshire strategy, which includes 9 strategic
principles and 46 actions under the 5 workstreams of Energy, Nature, Transport, Waste and
Adaptation. The 9 strategic principles which are being implemented are:
1.We will take a whole system approach (including behaviour change) to tackling climate
change as far as possible, including identification of optimal approaches to achieve social
and economic benefits alongside environmental ones.
2.We will continue to clarify and report transparently on our emissions so that the North
Ayrshire emissions baseline is clearly understood.
3.We will complete a Local Heat and Energy Efficiency Strategy to help understand where
efforts to reducing emissions and reducing fuel poverty are best focused.
4.We will prioritise actions in relation to two of the biggest emissions sources where have
the most influence, commonly referred to as ‘heat and fleet’, including through project
pathfinder approaches for decarbonisation of domestic and non-domestic buildings and
vehicles to bring scale and pace to emissions reduction.
5.We will work with stakeholders, including the Scottish Government, to articulate the
potential costs and skills requirements to meet our net-zero aspirations.
6.We will expand on the need for adaptation measures, recognising mitigation alone will not
combat the impacts of climate changes on communities.
7.We will identify opportunities for expansion of carbon sinks and other carbon capture
technologies, which are expected to be an essential element of our net-zero strategy to
mitigate residual emissions by 2030.
8.We will seek to expand the remit and membership of the CCSG to enable us to work more
closely with communities, taking account of outcomes from recent projects such as Climate
Action Towns and Carbon Neutral Islands.
9.We will explore the potential for carbon accounting, including carbon budgets for Council
services, to support our journey to net-zero.
Updates on progress are provided through the Council’s performance reporting system,
Pentana, on a quarterly basis, and governed through the Sustainability Board. Actions are
designed to be directly and indirectly responsible for carbon reduction and deliver other
socio-economic benefits.
20 September 2024:
Actions detailed within the Sustainable North Ayrshire Strategy continue to be implemented,
with progress monitored through the Council’s corporate performance management system
for example: 
• Participation in the Scottish Climate Intelligence Service to expand action on and
monitor area-wide emissions.
• Publication of North Ayrshire’s first Local Heat and Energy Efficiency Strategy
(LHEES) and progression of initial actions from Delivery Plan. 
• Development of two solar PV farms on former landfill sites. 
• Completion of feasibility study for the decarbonisation of built assets. 
• Progression of green hydrogen generation study. 
• Development of North Ayrshire Nature Network strategy to address statutory
requirements to tackle the nature crisis.
• Partnership working with Ayrshire Roads Alliance to undertake Electric Vehicle
Infrastructure project
31-Mar-2027 Russell
McCutcheon 
254

Page 255

Strategic Risk Action Plan Date Updated 20-Sep-2024
Analysis of Effectiveness of Controls Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG
• Successful realisation of £725,998 external funding for domestic energy efficiency
measures through ECO4 Flex partnership. 
Flood Risk Management Plan:
Cycle 2 of the Ayrshire Local Flood Risk Management Plan has
been developed and was published on 31st December 2022.
Studies and modelling will be undertaken to identify and prioritise
vulnerable areas where financial damage and risk to life are most
likely.
There is an ongoing programme of monthly inspections of debris
screens which have been installed to prevent vulnerable culverts
from blocking and causing flooding. CCTV inspections of culverts
are also undertaken to identify blockages and deterioration of
assets that might cause flooding. This has been effective in
reducing flooding, although there are capacity issues h that this
process cannot address.
The Upper Garnock Valley FPS has been completed and is
currently providing flood protection.
Ayrshire Shoreline Management Plan:
The Ayrshire Shoreline Management Plan will be replaced with a
Coastal Change Adaptation Plan. The adaptation plan will enable
the Council and other stakeholders to effectively plan our future
22 February 2024:
1. We will undertake the actions outlined in cycle 2 of the Ayrshire Local Flood Risk
Management Plan. 
2. We will continue to look for opportunities to implement Natural Flood Management and we
will develop a range of further flood protection measures, which can be put forward as
schemes for inclusion in cycle 3 of the Ayrshire Flood Risk Management Plan and the
Ayrshire Local Flood Risk Management Plan.
3. We will complete the Millport Coastal FPS and the Mill Burn FPS.
4. We will continue to Inspect culverts, screens and watercourses for clearance and repair
work in accordance with the published schedule and prioritise maintenance works that would
substantially reduce flood risk. Efforts will be made to continue to identify unknown culverts
and add these assets to the ongoing inspection and maintenance process.
5. We will develop the Ayrshire Coastal Change Adaptation Plan in partnership with South
Ayrshire Council and other stakeholders.
20 September 2024:
1. The Millport Coastal Flood Protection Scheme is 99% complete and we will commence a
further flood protection scheme at the Mill Burn, also in Millport.
2. The Three Towns flood study is underway. This study will confirm flood risk from the
Stevenston Burn & the Stanley Burn. The impacts of climate change will be evaluated.
30-Jun-2028 Thomas Reaney 
255

Page 256

Strategic Risk Action Plan Date Updated 20-Sep-2024
Analysis of Effectiveness of Controls Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG
actions whilst allowing for flexibility in response to future changes.
It will incorporate recent international and UK advances in
adaptation and shoreline management planning to allow for local
interpretation and involvement.
Where flood risk is confirmed, scoping of the next steps will be completed and this will
inform the second stage of the study.
3. The North Ayrshire Water Body Clearance & Repair Schedule has been updated to
include details of the planned assessment of various water bodies. Where these
assessments find that the condition of the water bodies would or could contribute to
significant flood risk, then the necessary clearance and repair work will be scheduled and
completed.
4. Storm Gerrit brought widespread flooding to North Ayrshire on the 27 December 2023.
Emergency repairs to culverts in Millport and Kilbirnie have now been completed.
5. In April 2024, a blockage in the Minister’s Cast culvert increased flood risk to roads and
properties in Irvine including The Circuit leisure facility and Woodlands Primary School. The
clearance and repair framework was used to commission emergency works that restored the
performance of the culvert. 
6. A draft coastal management study at Irvine & Stevenson is complete and was subject to
public consultation in September 2024. When finalised, the study will help to inform a local
Coastal Change Adaptation Plan. This plan will set out triggers for when the coastal erosion
and flood risk adaptations identified in the management study should be implemented. 
256

Page 257

Risk Code SRR2425_R07 Risk Title Community Capacity Building and Empowerment Latest Note Date  19 Sept 24
Risk Owner Rhonda Leith
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Unrealistic timescales for progressing of aspects of
legislation of the Community Empowerment Act
(Scotland) 2015, such as Community Asset
Transfer. 
Pressure to support community capacity building
and the variation of needs within a reducing
workforce. 
Duplication of effort across HSCP and Locality
Partnerships to foster community participation and
deliver engagement activities.
Complying with the complex and resource
intensive consultation legislation in service
redesign.
Rising energy and utility costs relating to property
management.
Budget savings and pressure on property
maintenance budgets.
Where the risk is not managed effectively the
potential benefits of community capacity building
and empowerment may be lost. 
Widening inequality gap between those
communities where levels of capacity and
engagement with the empowerment agenda are
high and those with less social capital where
interest remains low, which constrains the ability
to influence the planning and delivery service. 
Any disconnect between the Council’s
aspirations, community appetite for increasing
ownership of assets and what communities
themselves feel able and prepared to commit to
can result in community assets reverting back to
Council. 
Accelerating asset transfer risks losing services
and facilities and risks the ability to plan, connect
and deliver strategic services. 
Over-engagement carries disengagement and
engagement fatigue.
Increased property costs can be a deterrent for
organisations engaging and completing the CAT
process.
Lack of budget to undertake proactive
maintenance is resulting in NAC buildings falling
into disrepair detracting organisations from
progressing to lease and or ownership of NAC
assets.
Ongoing commitment to community empowerment and
locality partnerships from CPP. 
Six locality partnerships and alignment with HSCP
locality arrangements. 
Leadership of the CPP Senior Officers’ Group. 
Enabling approach with community partners and support
with third sector interface to build capacity and identify
opportunities for growth and sustainability. 
Reviewed guidance and processes relating to
community empowerment functions. 
Participatory budgeting approach local grants,
commitment to PB with partners and leading practice in
mainstreaming participatory approaches 
External funding bid help for groups through regular
meetings with third sector, funders and funding officer. 
Membership of The Consultation Institute.
Investment from Community Asset Transfer Start Up
Fund, prioritising additional staffing capacity to support
CAT in TACT.
A collaboration and shared resource approach across
Connected Communities Teams will be taken to ensure
the Service deliver on this priority.
5 4
Status Risk Score
Heat Map 
Change in Score Approach
Increase from 16 to 20 Treat 
Increasing  20 
257

Page 258

Strategic Risk Action Plan  19-Sept-24
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
Implementation of Community Empowerment Act: 
Existing controls remain effective and are kept under review.  
05 February 2024: 
Strategic CLD Plan 2021-2024 identifies priorities for capacity building and the programme
of community support is addressing needs. No further update at this time.
19 September 2024:
New Strategic CLD Plan 2024 – 2027 in final stages of development and continues to
identify priorities and support available.
31-Mar-2025 Rhonda Leith 
05 February 2024: 
Post implementation the plan will be monitored and reported as per statutory timescales.
19 September 2024:
Linking with National partners i.e. Scottish Government to ensure timely communication to
any changes relating to national legislation and allow preparations to be in place.
31-Dec-2024 Rhonda Leith 
Staff capacity: 
Existing controls remain effective however forthcoming VER
structure changes will result in a reduction of CLD professional
staff and risks further pressures on staff to deliver effectively to
key outcomes.
05 February 2024: 
CLD service redesign will be implemented from 1st of April with a 6-month review date. The
redesign in light of VER impacts has resulted in the loss of the Capacity and Empowerment
Team, all key priorities of the team will be embedded in the newly formed localities Contact
agreement established with key 3rd Sector organisations This will mitigate the impact on
developments of the key outcomes as detailed in the CLD plan. The CLD plan review will
commence in April, following guidance due to be issued by the Scottish Government which
will be informed by the National Review Of CLD.
19 September 2024:
Function review within the CLD team underway to assess capacities and impact following
the service redesign. Focus will be on assigning resource to key priorities.
31-Dec-2024 Rhonda Leith 
Duplication of effort:
Clearly defined roles and lean processes are reviewed and
maintained to avoid duplication of effort and minimise time and
resource wastage. The team foster open communication
channels with both staff and key stakeholders.
05 February 2024:
Existing controls are effective but remain under proactive review.
19 September 2024:
The aim is to capture and address issues through the review of functions underway within
the CLD team.
31-Dec-2024 Rhonda Leith 
Consultation:
Existing controls remain effective. Existing controls remain
effective and hybrid engagement models have been
implemented post covid to encourage and provide greater
access to participation.
05 February 2024:  Proactive review 6 months post VER restructure to assess the
effectiveness of CLD support for community engagement and consultation.
No further update at this time.
19 September 2024:
Cross Service support for consultation and engagement is being further developed with the
promotion of existing tools and supports across all Council services to encourage
ownership over service engagement.
31-Mar-2025 Rhonda Leith 
Increased property costs and lack of investment in community
assets.
05 February 2024
A collaborative approach involving PMI and CC is being used to survey and evaluate
community buildings that require investment. CAT funds have been identified for corrective
actions, which will involve incorporating green investments to support future CAT and
Service development initiatives.
19 September 2024:
Matter escalated through a range of mechanisms including Health & Safety, PMI/Risk
meetings and reporting systems as well as more frequent management on-site building
visits to assess building condition and escalate accordingly.
A strategic plan is in the early stages of development to address identified condition issues
in buildings earmarked for potential Community Asset Transfer (CAT). Specific investment
funds have been allocated to support this initiative.
31-Mar 2025 Rhonda Leith 
258

Page 259

Risk Code SRR2425_R08 Risk Title Property Asset Risk Latest Note Date  13-Sep-2024
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The long-term impact of restricted budget
availability for investment in the Council’s property
assets means these assets are in declining
condition and have greater long term investment
needs. 
Systemic building safety issues have been
evidenced by issues such as national high profile
safety issues, and the presence of RAAC through
the public sector property portfolio. These have
highlighted the substantial increasing burden of
property asset management.
There have been a number of near misses or
critical failures of aging heating plant and
equipment which the council cannot afford to
replace on a programmed basis.
Inflationary pressures, and on-going volatility in the
construction & related activities sphere, place
further difficulties in the ability of restricted budgets
to address all priorities. 
Maintenance issues and failure of building
components are increasingly likely to result in
disruption to service delivery. There is also an
increasing risk of health and safety and statutory
compliance obligations not being achieved. 
Property events requiring significant interventions
leading to service disruption, closure of facilities,
decant etc. are in increasing in frequency and
often over-lapping (often coinciding with weather
events).
Property condition information is gathered and recorded
within the Council’s electronic asset management
system, providing a baseline to measure building
element lifecycle replacement requirements across the
corporate estate.
The limited investment available is therefore targeted on
priorities. 
Reactive maintenance, and statutory compliance are
also undertaken corporately by PMI, by appropriately
trained / experienced staff. 
There is an on-going Transformation programme
workstream focusing on property rationalisation as a
means of reducing the financial burden of the estate
through reducing overall area occupied (aligned to
carbon reductions). 
Post Incident reviews and lessons learned exercises
with actions undertaken where feasible to do so.
Risk based property reviews are underway to examine,
on a property by property basis, where property risks
have the potential to impact service delivery. The
information gathered influences both investment plans
and business continuity plans. This work is on-going in
respect of the school estate and is being rolled-out to
other services’ assets.
4 5
Status Risk Score
Heat Map 
Change in Score Approach
No Change Treat
Stable 20 
259

Page 260

Strategic Risk Action Plan Date Updated 13-Sep-2024
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
CC&M team within PMI managing reactive maintenance and
statutory compliance.
Team resources stretched; however, restricted budgets are principal risk. 
13 September 2024:
Team resources remain stretched, presently exacerbated by recent staff departure,
recruitment exercise currently on-going.  
Ongoing Russell
McCutcheon 
Asset management team within PMI collecting asset condition
information and leading prioritisation of lifecycle investment.
Improved asset management system is being investigated; however, restricted budgets are
principal risk. 
13 September 2024:
Work continues in relation to the new asset management system, including bench-marking
and information sharing with other authorities.  
Ongoing Russell
McCutcheon 
Property rationalisation programme
Locality based property review work currently underway to increase scale and pace of
implementation. 
13 September 2024:
The Irvine Property Accommodation programme received Cabinet approval in March 24
and is progressing to programme. 
Ongoing Russell
McCutcheon 
Risk based property review process
Requires up to date property information, including client information and cross service
buy-in to be effective. 
13 September 2024:
The Education Estate has been reviewed in its entirety and quarterly meetings have been
established to continue this work on a priority-basis. 
The approach has also been utilised in respect of the communities estate. 
Ongoing Russell
McCutcheon 
260