Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
16 October 2024 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 23 OCTOBER 2024 at 11:00 AM, which you
are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 18
September 2024 at 10.30 am (Pages 3 - 22)  
(b) Planning, Protective Services and Licensing Committee held on 18
September 2024 at 2.00 pm (Pages 23 - 26)  
(c) Planning, Protective Services and Licensing Committee held on 18
September 2024 at 3.00 pm (Pages 27 - 28)  
(d) Planning, Protective Services and Licensing Committee held on 18
September 2024 at 4.00 pm (Pages 29 - 32)  
(e) Planning, Protective Services and Licensing Committee held on 20
September 2024 (Pages 33 - 36) 
4. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI FARE SCALE REVIEW
(Pages 37 - 40)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
5. TORLOISK ESTATE: CONVERSION AND EXTENSION OF STONE BARN TO
FORM DWELLINGHOUSE, INSTALLATION OF SEPTIC TANK AND FORMATION
OF VEHICULAR ACCESS: LAND WEST OF LAGGANULVA FARM, ULVA FERRY,
ISLE OF MULL (REF: 23/00185/PP) (Pages 41 - 106)  
Report by Head of Development and Economic Growth
Public Document Pack

Page 2

6. YLEM ENERGY LTD: CONSTRUCTION AND OPERATION OF A BATTERY
ENERGY STORAGE SYSTEM (BESS) WITH ANCILLARY INFRASTRUCTURE:
ARDENCAPLE FARM, RHU, HELENSBURGH (REF: 23/02472/PP) (Pages 107 -
136)  
Report by Head of Development and Economic Growth 
7. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: SECTION 42 APPLICATION
FOR REMOVAL OF CONDITION 11 RELATIVE TO PLANNING PERMISSION
REFERENCE 22/00782/PP (TO CONSTRUCT AND OPERATE A 132/275
KILOVOLT (KV) GIS SUBSTATION AND ASSOCIATED INFRASTRUCTURE THAT
WILL CONNECT THE EXISTING 132 KV OVERHEAD LINE (OHL) FROM
TAYNUILT TO INVERARAY TO A PROPOSED 275 KV OHL TO DALMALLY:
LAND APPROXIMATELY 2.5 KM SOUTHWEST OF CLADICH (REF: 24/00260/PP)
(Pages 137 - 154)  
Report by Head of Development and Economic Growth 
8. MASTERPLAN REPORT: DUNOON & KILBRIDE HILL STRATEGIC
MASTERPLAN (24/00604/MPLAN) (Pages 155 - 174)  
Report by Head of Development and Economic Growth 
9. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: SECTION 42 APPLICATION
FOR VARIATION OF CONDITION 7 RELATIVE TO PLANNING PERMISSION
REFERENCE 23/00382/PP (ERECTION OF HIGH VOLTAGE ELECTRICITY
SUBSTATION AND FORMATION OF ASSOCIATED ACCESS, LANDSCAPING,
DRAINAGE AND MEANS OF ENCLOSURE AND PLATFORM EXTENSION): LAND
ADJACENT TO CROSSAIG SUB STATION, SKIPNESS (REF: 24/01098/PP)
(Pages 175 - 194)  
Report by Head of Development and Economic Growth 
10. GOVERNMENT CONSULTATIONS: BUILDING REGULATIONS: DETERMINING
THE PRINCIPLES FOR A SCOTTISH EQUIVALENT TO THE PASSIVHAUS
STANDARD: STAGE 1 CONSULTATION (Pages 195 - 200)  
Report by Executive Director with responsibility for Development and Economic
Growth 
11. REGULATORY SERVICES PERFORMANCE REPORT 2023-2024 (Pages 201 -
220)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair (Vice-Chair)
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie
Councillor Fiona Howard 
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Fergus Murray, Head of Development and Economic Growth
Stuart McLean, Committee Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Kirsty Sweeney, Area Team Leader (Bute, Cowal, Helensburgh and
Lomond)
Tim Williams, Area Team Leader (Oban, Lorn and the Isles)
Stuart Ramsay, Senior Planning Officer
Emma Shaw, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey and Mark Irvine. 
2. DECLARATIONS OF INTEREST 
Councillor Dougie Philand declared a non-financial interest in planning application
reference 23/00185/PP as he was a personal friend of the leaseholder of the land. 
Councillor Dougie Philand also declared a non-financial interest in planning application
reference 24/00564/PP as he was appointed to the Fyne Homes Management Board by
the Council.   He confirmed that he would leave the meeting and take no part in the
consideration of both these applications which were dealt with at items 5 and 7 of this
Minute. 
Councillor Graham Hardie declared a non-financial interest in Enforcement Case
Reference 15/00051/ENAMEN as he was a personal friend of the landowner.  He
confirmed that he would leave the meeting and take no part in the consideration of this
case which was dealt with at item 15 of this Minute. 
Councillor Peter Wallace also declared a non-financial interest in planning application
reference 24/00565/PP dealt with at item 7 of this Minute.  Having taken note of the
Standards Commission Guidance in relation to declarations (issued on 7 December
2021), with specific reference to section 5.4(c), he did not consider that he had a relevant
connection and as such would remain in the meeting. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 21
August 2024 at 11.00 am was approved as a correct record.
Page 3 Agenda Item 3a

Page 4

b) The Minute of the Planning, Protective Services and Licensing Committee held on 21
August 2024 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 29
August 2024 was approved as a correct record. 
4. BEATON AND MCMURCHY ARCHITECTS LTD: SITE FOR THE ERECTION
OF DWELLINGHOUSE: LAND NORTH OF LYNBURN, ROWAN ROAD,
OBAN (REF: 22/01986/PPP) 
The Planning Officer spoke to the terms of the report.  This application was presented to
the PPSL Committee on 21 February 2024 and was granted subject to conditions and the
conclusion of a Section 75 Agreement. 
A supplementary report advised Members of a change in circumstances regarding the
legal control over the relevant section of land that negates the requirement for a Section
75 Agreement. 
Members were asked to note the content of this report, which did not introduce any new
information that had not already been addressed in the original report of handling.  It was
also recommended that planning permission be granted subject to the conditions and
reasons appended to this report. 
Decision 
The Committee noted the contents of the report and agreed to grant planning permission
subject to the following conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in Conditions 3, 4, 5, 7, 8 and 9 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details.  
Reason: In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended). 
2. PPP - Approved Details 
The development shall be implemented in accordance with the details specified on the
application form dated 30.09.2022 supporting information and, the approved drawings
listed in the table below. 
Page 4

Page 5

Plan Title. Plan Ref. No. Version Date Received
Site Plan &
Section 
2034 02 B 13.10.2022
Site & Location
Plans 
2034 03 B 13.10.2022
Cross Sections 2034 04   01.12.2022
Site & Location
Plans Road
Improvements
Proposals 
2034 07 A 06.02.2024
Junction Site
Plan as
Proposed 
2034 11   06.02.2024 
Reason: To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013. 
3. Timescale to be Agreed for Completion 
Pursuant to condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and
approved by the Planning Authority. Thereafter, the development shall be implemented
in accordance with the duly approved timescale for completion unless an alternative
timescale for completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
4. Vehicular Access, Parking and Turning 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the means of vehicular access and parking/turning arrangements to serve the
development have been submitted to and approved by the Planning Authority. Such
details shall incorporate: 
i) The upgrade of the existing access at the connection with the public road in
accordance with the Council’s Roads Standard Detail Drawing SD08/002a with
visibility splays measuring 2.4 metres to point X by 25 metres to point Y; 
ii) The provision of a parking and turning area in accordance with the requirements
of Policy LDP 11 and Supplementary Guidance SG LDP TRAN 6 of the adopted
‘Argyll and Bute Local Development Plan’ 2015; 
iii) The provision of a footway to be provided over the total length of the private
road; 
iv) A road carriageway with a minimum width of 3 metres; 
v) The provision of passing places in accordance with Operational Services
Drawing 08/003a at locations approximately 50m, 90m and 180m from the
junction with the public road; 
Page 5

Page 6

vi) The provision of a turning head in accordance with Figure 18 of The Roads
Development Guide to be provided at the location where the private road
separates to serve the dwellings leading to ‘Toriskay’ and the dwellings leading
to ‘High Acres’ / ‘Rowan Hill’, with a bin storage area to the rear of the turning
head; 
vii) The provision of street lighting ducting to be installed from the junction with the
public road to the location where the private road separates to serve the
dwellings leading to ‘Toriskay’ and the dwellings leading to ‘High Acres’ /
‘Rowan Hill’; 
Prior to any work starting on site, the visibility splays shall be cleared of all obstructions
such that nothing shall disrupt visibility from a point 0.6m above the road carriageway
at point Y and the visibility splays shall be maintained clear of all obstructions
thereafter. 
The approved scheme of road improvement works shall be fully implemented prior to
any works commencing in relation to the construction of the dwelling. The developer
shall provide written notification to the planning authority upon completion of the
approved road improvement works and shall not proceed with any further development
within the application site boundary until such time as written confirmation has been
received from the planning authority, in consultation with the Council’s Roads
Engineers, that the completed road improvements are satisfactory. 
Reason: In the interests of road safety. 
Note to applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers prior to the formation/alteration of a junction
with the public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
5. PPP – Availability of Connection to Public Water Supply 
Pursuant to Condition 1 - no development shall commence on site until authorisation
has been given by Scottish Water for connection to the public water supply.
Confirmation of authorisation to connect shall be provided in writing to the Planning
Authority before commencement of development. 
Reason: To ensure that the development is adequately served by a public water
supply. 
Note to Applicant: 
• In the event that a public water supply connection cannot be obtained an alternative
private water supply would constitute a material amendment requiring the
submission of a further planning application. 
Page 6

Page 7

6. Sustainable Drainage System 
Notwithstanding the provisions of Condition 2, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter.  
Reason:  To ensure the provision of an adequate surface water drainage system and
to prevent flooding.    
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk . 
7. Design and Finishes 
Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the dwellinghouse has been
submitted to and approved by the Planning Authority. These details shall incorporate: 
i) A statement addressing the Action Checklist for developing design contained
within the Argyll and Bute Sustainable Design Guide 2006;  
ii) A statement addressing how the proposed development has been designed to
be consistent with the six qualities of successful places, as defined within Policy
14 of NPF4;  
iii) Local vernacular design; 
iv) Maximum of one and three quarter storey in design;  
v) Rectangular footprint with traditional gable ends;  
vi) Symmetrically pitched roof angled between 35 and 42 degrees finished in
natural slate or good quality artificial slate;  
vii) External walls finished in white wet dash roughcast, white smooth render,
natural stone, timber cladding or a mixture of these finishes;  
viii) Details of finished ground floor levels relative to an identifiable fixed datum
located outwith the application site, along with details of the existing and
proposed site levels shown in the form of section drawings, contour plans, site
level surveys, or a combination of these;  
ix) Windows with a vertical emphasis; and 
x) Details of an area within the application site for the placement of
refuse/recycling bins. 
Page 7

Page 8

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surroundings. 
8. Landscaping and Biodiversity Enhancement 
Pursuant to Condition 1 - no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by
the Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;  
ii) Surface treatment of proposed means of access and hardstanding areas;  
iii) Any proposed re-contouring of the site by means of existing and proposed
ground levels;  
iv) Proposed hard and soft landscape works; and  
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme.  
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use.  
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority.  
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.  
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
9. Pre-commencement Survey 
Pursuant to Condition 1 - no development or other work shall be carried out on the site
until a pre-commencement survey for the presence of nesting birds has been carried
out by an appropriately qualified person and has been submitted for the written
approval of the Planning Authority. In circumstances where species of interest are
identified as being present, or at risk from construction works, the survey shall further
provide suggested avoidance and or mitigation measures, including timing constraints,
Page 8

Page 9

to address such presence or risk. The development shall be implemented in
accordance with the measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
(Reference: Supplementary Report Number 2 dated 4 September 2024, submitted) 
Having previously declared an interest in the following item, Councillor Dougie Philand left
the meeting at this point. 
5. TORLOISK ESTATE: CONVERSION AND EXTENSION OF STONE BARN
TO FORM DWELLINGHOUSE, INSTALLATION OF SEPTIC TANK AND
FORMATION OF VEHICULAR ACCESS: LAND WEST OF LAGGANULVA
FARM, ULVA FERRY, ISLE OF MULL (REF: 23/00185/PP) 
The Planning Officer spoke to the terms of the supplementary report number 4.  This
application was presented to the Committee on 22 May 2024 and the Committee agreed
to request from Planning Officers information on what impact this proposed development
would have on access to, and operation of, the remaining agricultural land in terms of
Policy 83 of LDP2 – Safeguarding Agricultural and Croft Land. 
Planning Officers sought further information from both the Applicant and the tenant farmer
and this has now been received.  A request was made to continue consideration of the
application until the information received could be assessed. 
Decision 
The Committee agreed to note the content of the report and continue consideration of this
application until the information received had been assessed. 
(Reference: Report by Head of Development and Economic Growth dated 8 May 2024,
supplementary report number 1 dated 21 May 2024, supplementary report number 2
dated 10 June 2024, supplementary report number 3 dated 12 August 2024 and
supplementary report number 4 dated 4 September 2024, submitted) 
Councillor Philand returned to the meeting. 
6. BAKKAFROST SCOTLAND LTD: FORMATION OF FISH FARM (ATLANTIC
SALMON) INCORPORATING 8 X 160M CIRCUMFERENCE CIRCULAR
CAGES AND SITING OF FEED BARGE: WEST OF ISLE OF GIGHA (REF:
23/01758/MFF) 
The Major Applications Team Leader spoke to the terms of the report and to
supplementary report number 1 which advised of an error in paragraph 4.2 of the main
report of handling and late representations received.  This application is for the installation
of a new marine fish farm for the farming of Atlantic salmon in the Sound of Jura
approximately 450 m west of the Isle of Gigha.  The site would comprise 8 x 160 m
circumference pens in a 2 x 4 formation along with a 600 tonne feed barge which would
be located at the centre of the group on the shore side.  The site would be serviced from
the Company’s existing shore base located on the north east side of the Isle of Gigha. 
Page 9

Page 10

The proposal has attracted 31 objections and 16 expressions of support.  An objection has
also been raised by Gigha Community Council in their capacity as statutory consultee and
they have requested that Members visit the site. 
Given the level of interest in the application and the complexity of the issues raised, it was
recommended that Members give consideration to holding a pre-determination hearing in
advance of determining this application. 
Decision 
The Committee agreed:- 
1. to hold a discretionary pre determination hearing at the earliest opportunity on a hybrid
basis within the Council Chamber, Kilmory, Lochgilphead and by Microsoft Teams; and 
2. to hold a site visit in advance of the date of the hearing. 
(Reference: Report by Head of Development and Economic Growth dated 5 September
2024 and supplementary report number 1 dated 17 September 2024, submitted) 
Having previously declared an interest in the following item, Councillor Dougie Philand left
the meeting at this point. 
7. FYNE HOMES: ERECTION OF EIGHT AFFORDABLE DWELLINGHOUSES
AND FORMATION OF VEHICULAR ACCESSES: VACANT LAND AT
JUNCTION OF BALLOCHGOY ROAD AND BLAIN TERRACE, ROTHESAY,
ISLE OF BUTE (REF: 24/00564/PP) 
The Area Team Leader spoke to the terms of the report.  Planning permission is sought
for the erection of eight dwellinghouses on a grassed area of land measuring 0.23
hectares in Rothesay, Isle of Bute.  The proposal comprises four dwellinghouses (two
semi-detached blocks) along the Ballochgoy Road frontage and four dwelling houses (two
detached blocks and semi-detached block) along the Prospect Terrace frontage. 
The site is located within the ‘Main Town’ of Rothesay as identified in the adopted Argyll
and Bute Local Development Plan (LDP2) and given that it was previously occupied by
flatted blocks but is now grass, it represents brownfield land that has become naturalised. 
A sixteen signature petition objecting to the application has been submitted and a
representation has also been received, which neither advances support nor expresses
objection. 
Planning Officers consider the proposal to be consistent with the relevant provisions of the
Development Plan and there are no other material considerations of sufficient significance
to indicate that it would be appropriate to withhold planning permission. 
It was recommended that planning permission be granted subject to the conditions,
reasons and information notes detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions,
reasons and informative notes:
Page 10

Page 11

Standard Time Limit Condition for Planning Permission (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. Unless otherwise directed by any of the conditions below, the development shall be
implemented in accordance with the details specified on the application form dated
22nd March 2024; the Addendum dated 3rd April 2024; supporting information; and the
approved drawings listed in the table below unless the prior written approval of the
Planning Authority is obtained for an amendment to the approved details under Section
64 of the Town and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received
Location Plan  Drawing No. 7860/LOC   -  28.03.2024
Existing Site Plan Drawing No. 7860/01 B  04.04.2024
Proposed Site
Plan 
Drawing No. 7860/02 F 22.08.2024
House Type B   Drawing No. 7860/03 D 28.03.2024
House Type E   Drawing No. 7860/04 D 04.04.2024
Street Elevations
as Proposed  
Drawing No. 7860/05 A 25.03.2024
Existing Below
Ground Drainage
Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00030
P01 25.03.2024
Existing Below
Ground Drainage
Layout
(Remediation) 
Drawing No. 312115-
HAH-XX-XX-D-C-00031
P02 25.03.2024
Proposed Below
Ground Drainage
Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00032
P03 25.03.2024
Proposed External
Levels Layout 
Drawing No. 312115-
HAH-XX-XX-D-C-00040
P04 25.03.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Page 11

Page 12

2. Parking Spaces and Dropped Footways 
Unless otherwise agreed in writing with the Planning Authority, prior to the
development first being occupied, the following works shall be completed in
accordance with the details shown on the approved Drawing No. 7860/02 Rev F
‘Proposed Site Plan’: 
• The parking areas within the curtilage of each dwellinghouse and the visitor parking
spaces shown as V1 and V2 shall be laid out and surfaced and shall thereafter be
maintained clear of obstruction for the parking and manoeuvring of vehicles 
• The entire length of the footway along Ballochgoy Road between the westernmost
parking bay at Plot 8 and the easternmost parking bay at Plot 5 shall be dropped 
• The entire length of the footway along Prospect Terrace between the northernmost
parking bay at Plot 1 and the southernmost parking bay at Plot 4 shall be dropped 
Reason: In the interests of road and pedestrian safety. 
3. Visibility Splays 
Prior to the occupation of each individual dwellinghouse, sightlines of 42 metres in both
directions, measured from a distance of 2.4 metres back from the edge of the public
road at the centre point of the two in-curtilage parking spaces, shall be cleared of all
obstructions above a height of 1.05 metres from the level of the road and thereafter
maintained as such in perpetuity. 
Reason: In the interests of road and pedestrian safety. 
4. Removal of PD Rights - Dwellinghouses 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Class 1D and 2B of the
aforementioned Schedule, as summarised below:  
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to its
roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Reason: To prevent the formation of additional window/door openings or dormer
windows which may give rise to a loss of privacy to adjoining property without prior
assessment on application by the Planning Authority; which would otherwise be
capable of being carried out under Article 2(4) of the Town and Country Planning
(General Permitted Development) (Scotland) Order 1992 (as amended).   
Page 12

Page 13

5. Secure Affordability by Restricting Development to RSL 
The development hereby permitted shall only be implemented by a Registered Social
Landlord (a body registered under part 3 chapter 1 of the Housing (Scotland) Act 2001,
or any equivalent provision in the event of the revocation and re-enactment thereof,
with or without modification) and shall not enure for the benefit of any other person,
company or organisation. 
Reason: To ensure the provision of affordable housing to the standard required by the
development plan in the absence of any other agreed means of securing such
provision. 
6. Timescale to be Agreed for Completion 
Prior to development commencing, details of the proposed timescale for completion of
the approved development shall be submitted to and agreed in writing with the
Planning Authority. Thereafter, the development shall be implemented in accordance
with the duly approved timescale for completion unless an alternative timescale for
completion is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
7. Electric Vehicle Charging 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in
writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed.  
The approved charging point or, where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority.  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
8. Surface Water Drainage 
No development shall commence on the site until written evidence has been submitted
to the Planning Authority that Scottish Water (or any of its successors as the
organisation responsible for the public waste water treatment system) has authorised
the connection of surface water drainage from the site into the combined sewer. Such
evidence shall include full details of the design of the surface water drainage system
that has been agreed with Scottish Water and the approved arrangements shall be
fully installed prior to the occupation of the dwellinghouses. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Page 13

Page 14

9. Landscape/Surface/Boundary Treatment and Biodiversity Enhancement 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates;
ii) Surface treatment of proposed means of access and hardstanding areas;
iii) Any proposed re-contouring of the site by means of existing and proposed ground
levels;
iv) Proposed hard and soft landscape works including the details of the retaining walls;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary treatment,
surface treatment and any re-contouring works have been completed in accordance
with the duly approved scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
10. Construction hours 
In order to minimise, as far as necessary, the level of noise and/or vibration to which
nearby existing residents will be exposed during the erection of the dwellinghouses,
the hours of working in relation to the construction of the development on the site
should be restricted to 08.00 to 18:30 Monday to Friday and 08.00 to 13.00 on
Saturdays. There should be no operations on Sundays or Bank Holidays. All
operations should be undertaken in compliance with best practicable means for noise
and vibration control as documented in BS 5228- 1:2009+A1:2014 and BS 5228-
2:2009+A1:2014. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
11. Provision of Screening to Prevent Interlooking Between Habitable Room
Windows 
Prior to the occupation of the dwellinghouses identified on the approved plans as Plot
Numbers 7 and 8, details of those screening measures that are to be implemented
along the boundary of the site as it meets with the southernmost curtilage of No. 2
Blain Terrace shall be submitted to and approved in writing by the Planning Authority. 
Such details shall identify the provision of a fence (or similar means of boundary
treatment) that shall ensure there is no direct unobstructed line of sight between the
window on the south-facing elevation of No. 2 Blain Terrace and the windows of any
Page 14

Page 15

habitable rooms on the north-facing elevations of the dwellinghouses on Plot Numbers
7 and 8. 
The screening measures shall be fully installed in accordance with the approved
details prior to the occupation of the subject dwellinghouses and shall be maintained in
a safe and tidy condition thereafter unless the prior written consent of the Planning
Authority is obtained for variation. 
Reason: In the interests of the privacy and amenity of the existing and proposed
dwellinghouses having regard to the relevant provisions of NPF4 and the Argyll and
Bute Local Development Plan 2 and its related Technical Notes. 
12. Installation of Air Source Heat Pump 
Prior to the installation of any air source heat pumps within the development site, full
details of their location and specification shall be submitted to and approved in writing
by the Planning Authority. The noise level from the operation of any air source heat
pumps that are installed must not exceed 42dB LAeq (5 min) at 1 metre from the
window of a habitable room on the façade of any neighbouring residential property. 
If, in the opinion of the Planning Authority, any air source heat pump results in a noise
nuisance to the occupant of any neighbouring dwelling, the Applicant shall install noise
mitigation measures in agreement with the Planning Authority. 
Reason: In order to avoid sources of nuisance in the interest of amenity. 
13. Waste Storage 
Prior to the occupation of the dwellings hereby approved, a detailed specification of the
containers to be used to store waste materials and recyclable materials produced by
the dwelling houses as well as specific details of the areas where such containers are
to be located shall be submitted to and approved in writing by the Planning Authority. 
Unless otherwise agreed in writing with the Planning Authority, the storage of waste
and recyclable materials shall be fully installed in accordance with the approved details
prior to the occupation of each dwellinghouse. 
Reason: In the interest of visual amenity; to ensure that there is adequate storage for
recycling of waste; and to protect the amenity of the immediate area by preventing the
creation of nuisance due to odours, insects, rodents or birds. 
14. Construction Management Plan 
Prior to the commencement of the development hereby approved, a Construction
Management Plan shall be submitted to and approved in writing by the Planning
Authority. The plan shall include the following: 
o Contact details for the contractor 
o The proposed route of construction traffic
o The turning areas and wheel washing areas
o The provision of appropriate signage
o The location of the site compound (if any) and the parking area for vehicles
belonging to site operatives and visitors 
Page 15

Page 16

o The location of the storage area (if any) for plant and materials used in the
construction the development 
o The method of working and the measures to be implemented to control the
emission of dust during construction. Such details shall be in accordance with the
methodology outlined in the IAQM guidance on the assessment of dust from
demolition and construction 2014 (version 1.1) 
o The location of the security fencing 
Thereafter, all works shall be carried out in accordance with the agreed Construction
Management Plan. 
Reason: In order to avoid sources of nuisance in the interests of amenity. 
INFORMATIVE NOTES 
1. The attention of the applicant/developer is drawn to the contents of the letter from
Scottish Water dated 17th April 2024, which is available for inspection on the Council’s
web site. 
With specific regard to Condition 8 above, it should be noted that Scottish Water have
stated that, other than in limited exceptional circumstances, they will not accept any
surface water connections into their combined sewer system for reasons of
sustainability and to protect existing customers from flooding. In order to depart from
this position on surface water connections, Scottish Water require significant
justification to be prepared and submitted by the applicant/developer. 
It will be for the developer and their engineers to submit their case to Scottish Water. If
this is found to be an unacceptable arrangement, an amended development may have
to be designed or a different surface water drainage system may have to be
formulated. The details of such a scheme will be expected to comply with SuDS and
will be considered by the Planning Authority’s Flood Risk Adviser as required. 
2. Those works to be undertaken on or adjacent to the public road will require a Road
Opening Permit (S56) in advance of being carried out and it will also be necessary for
positive drainage measures to be incorporated into the design of each individual
access to ensure that surface water drainage will not pass on to the footway or
carriageway. The applicant/developer is advised to contact Roads and Amenity
Services on 01546 605514 or to use the following link to the Council's website:
https://www.argyll-bute.gov.uk/licences/road-opening-permit 
(Reference: Report by Head of Development and Economic Growth dated 30 August
2024, submitted) 
Councillor Philand returned to the meeting. 
8. MS LIZ MAXWELL: DEMOLITON OF EXISTING DWELLINGHOUSE AND
ERECTION OF REPLACEMENT DWELLINGHOUSE AND ASSOCIATED
WORKS: COMRAICH, MANNAL, ISLE OF TIREE (REF: 24/01153/PP) 
The Area Team Leader spoke to the terms of the report.  In terms of the Settlement
Strategy set out in the adopted LDP2, the site is identified as being within the defined
Settlement Area of Balemartine on the proposals maps where LDP2 Policy 01 states that
development will normally be acceptable subject to a number of criteria.
Page 16

Page 17

The proposal is seeking to secure planning permission for the demolition of the existing
dwellinghouse, ‘Comraich’ to allow for the redevelopment of the site with a purpose built
dwellinghouse. 
The proposal has elicited 25 objections and 14 expressions of support.  The main thrust of
objection relates to the scale, design and finishes of the proposed development. 
It is the opinion of Planning Officers that the design proposed for the replacement
dwellinghouse pays appropriate regard to the characteristics of the area and the proposal
is considered to accord with the provisions of the current Development Plan and with
national planning policy. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 19/06/24, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location
Plan 
CH1087 – AECO – XX – ZZ – DR
– A – 2000
05 20/06/24
Site Plan
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2001
07 20/06/24 
Site Plan
as Existing 
CH1087 – AECO – XX – ZZ – DR
– A – 2002
05  20/06/24 
Floor Plans
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2004
07 20/06/24 
Elevations
as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2005 
02  20/06/24
Street
Elevation
CH1087 – AECO – XX – ZZ – DR
– A – 2006 
03  20/06/24
Page 17

Page 18

as
Proposed 
Sections as
Proposed 
CH1087 – AECO – XX – ZZ – DR
– A – 2007
02  20/06/24 
Design
Statement
– 10 Pages 
20/06/24 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. PP – Sustainable Drainage System 
Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition.  The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk 
4. PP – Submission of Sample Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
samples of the proposed roofing materials to be used in the proposed development
have been submitted to and approved in writing by the Planning Authority. The
development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
5. PP - Electric Vehicle Charging – Residential with off street parking 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in
Page 18

Page 19

writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed.  
The approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
6. PP – Biodiversity Statement 
No development shall commence until a biodiversity statement demonstrating how the
proposal will contribute to conservation/restoration/enhancement of biodiversity, and
how these benefits will be maintained for the lifetime of the development has been
submitted and agreed in writing with the Planning Authority. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To comply with the requirements of NPF4 Policy 3. 
(Reference: Report by Head of Development and Economic Growth dated 4 September
2024, submitted) 
9. CLAN CAMPBELL (WHISKY) LTD: PROPOSAL OF APPLICATION NOTICE
FOR WHISKY DISTILLERY, DUNNAGE WAREHOUSE, VISITOR
EXPERIENCE AND ASSOCIATED INFRASTRUCTURE: INVERARAY
CASTLE ESTATE, INVERARAY (REF: 24/01438/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed site is located
partly within and partly adjacent to a listed walled garden, first constructed between 1752
and 1755, all set within the historic designated garden and designed landscape of
Inveraray Castle.  In terms of the adopted Local Development Plan (LDP2), the site is
located within the designated Countryside Area. 
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Page 19

Page 20

Decision 
The Committee noted the content of the report and requested that the following matters be
given consideration in finalising any future planning application submission – 
• The Committee welcomed the economic benefit to the area; 
• The Committee asked that consideration be given to using the existing access to the
south of the estate as it had good visibility splays at that location; and 
• The Committee asked that consideration be given to the Applicant supporting the
upkeep and maintenance of the Inveraray-Dalmally road. 
(Reference: Report by Head of Development and Economic Growth dated 30 August
2024, submitted) 
10. DEVELOPMENT MANAGEMENT SERVICE PLAN 2024 - 2026 
A report seeking the endorsement of the Development Management Service 2024 – 2026
attached as Appendix A was considered. 
The Service Plan provides an overview of the Development Management Service and its
main duties and seeks to outline how the Service can operate to underpin the corporate
objectives of the Council. 
Decision 
The Committee agreed to approve and endorse the Development Management Services
Plan 2024 – 2026 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Development Management Service Plan
2024 – 2026, submitted) 
11. DEVELOPMENT MANAGEMENT CHARTER 2024 
A report seeking the endorsement of the Development Management Charter attached as
Appendix A was considered. 
The Development Charter is intended to inform customer expectations by providing an
overview of the Development Management Service, the Development Management
Process, and to set out the standard of service that customers should expect in terms of
both performance and the manner in which a service is provided. 
Decision 
The Committee agreed to approve and endorse the Development Management Charter
2024 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Development Management Charter
2024, submitted) 
Page 20

Page 21

12. UPDATED PLANNING ENFORCEMENT AND MONITORING CHARTER
2024 
A report seeking the endorsement of an updated Argyll and Bute Enforcement and
Monitoring Charter contained at Appendix A was considered. 
Enforcement Charters should be reviewed every 2 years and they must outline what
service is provided to customers and complainants in relation to breaches and alleged
breaches of planning control. 
Decision 
The Committee agreed to approve and endorse the updated Enforcement and Monitoring
Charter 2024 attached at Appendix A of the submitted report. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 10 September 2024 and Planning Enforcement and Monitoring
Charter 2024, submitted) 
The Chair ruled, and the Committee agreed, to take a short comfort break at this point. 
The Committee reconvened at 12.35 pm with all those present as per the sederunt with
the exception of Councillor Liz McCabe. 
13. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISION 
A report summarising a recent decision by Scottish Ministers following an appeal in
respect of planning application reference 21/01583/PP, was before the Committee for
information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted) 
14. UPDATE ON RECENT SCOTTISH MINISTERS SECTION 37 DECISION 
A report summarising the decision made by Scottish Ministers to approve Section 37
consent and deemed planning permission in respect of the proposed 275KV Transmission
line from Dalmally to Creag Dhubh, was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 5 September
2024, submitted) 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following 2 items of business on the
grounds that they were likely to involve the disclosure of exempt information as defined in
Page 21

Page 22

Paragraph 13 respectively of Part 1 of Schedule 7A to the Local Government (Scotland)
Act 1973. 
Councillor Graham Hardie, having declared an interest in the following item, left the
meeting at this point. 
15. ENFORCEMENT REPORT - REFERENCE 15/00051/ENAMEN 
The Committee considered enforcement case reference 15/00051/ENAMEN. 
Decision 
The Committee agreed to continue consideration of this case for a period of 6 months to
allow Planning Officers to make further investigations and consult with other agencies. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted) 
Councillor Hardie returned to the meeting. 
16. REQUEST FOR A TREE PRESERVATION ORDER 
The Committee considered a request for a Tree Preservation Order. 
Decision 
The Committee agreed the recommendations detailed in the report. 
(Reference: Report by Head of Development and Economic Growth dated 18 September
2024, submitted)
Page 22

Page 23

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown 
Councillor Graham Hardie
Councillor Fiona Howard
Councillor Andrew Kain 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
Heather Shephard, Applicant
Sergeant Ben Rushden, Police Scotland 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey, Mark Irvine, Paul Kennedy, Liz McCabe, Dougie Philand and Peter
Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
RENEWAL OF A TAXI DRIVERS LICENCE (H SHEPHARD, TAYNUILT) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of video
call and Ms Shephard joined the meeting by MS Teams. 
Police Scotland opted to proceed by way of audio call and Sergeant Ben Rushden joined
the meeting by telephone. 
The Chair outlined the procedure that would be followed and invited the Applicant to
speak in support of her application. 
APPLICANT 
Ms Shephard advised that she has been a taxi driver for nearly 10 years.  She first worked
for Tower Taxis and then Mid Argyll Taxis.  She confirmed that she now worked for herself
as it allowed her to be more flexible.  She apologised for the incident that had taken place. 
She said that she relied on her taxi job as her source of income to provide for herself and
her family.  She said that she had never had any incidents, nor even small bumps, apart
from this incident.  She added that she had never had any incidents when working.  She
advised that this had happened out with her working hours and was not in the car that she
uses as a taxi and was unrelated to work in any way.  She confirmed that she appreciated
the seriousness of the incident and the need for this hearing.  She apologised for not
notifying the Council earlier of the incident.  She said she was in complete turmoil about
Page 23 Agenda Item 3b

Page 24

the whole thing and that she had not intended to hide anything and that she was sorry for
that. 
QUESTIONS FROM POLICE SCOTLAND 
Sergeant Rushden confirmed that he had no questions. 
POLICE SCOTLAND 
Sergeant Rushden referred to a letter of representation dated 30 May 2024 from the
Divisional Commander which advised that the Applicant had been convicted of a road
traffic offence on 9 October 2023.  She received a fine, a victim surcharge and had her
licence endorsed as a result of an incident which had taken place on 15 May 2022. 
QUESTIONS FROM APPLICANT 
Ms Shephard confirmed that she had no questions. 
MEMBERS’ QUESTIONS 
Councillor Brown sought and received confirmation from Ms Shephard that she had been
driving for about 7 years prior to being a taxi driver. 
Councillor Brown asked Ms Shephard if she could explain what happened at the time of
the incident.  Ms Shephard advised that she was coming along the road and felt the back
wheels skid.  She said that she had never been in a skid before and did not know what to
do.  She advised that she tried to control the car which went onto the road verge.  She
managed to bring the car back onto the road but it started to skid again and she lost
control of the car and it spun round. 
Councillor Brown asked Ms Shephard if she had thought about undertaking any additional
training courses on how to react when a car went into a skid.  Ms Shephard confirmed that
she had phoned the local driving instructor but they had been unable to assist.  She said
she tried to get in touch with Driving Skills Scotland but had not received a reply.  She
confirmed that if there was something available like that she would like to do this. 
Councillor Hardie sought and received confirmation from the Applicant that she had been
driving at about 55 mph when the incident occurred.  She said she did not think it was
about speed and advised that she was driving on a straight bit of road.  She said she did
not know what caused the wheels to spin.  She pointed out that the car was new to her
and that may have been a factor.  She said she was not sure if it was working properly at
the time but advised that was no excuse. 
Councillor Green sought and received confirmation from Sergeant Rushden that the
offence under Section 3 of the Road Traffic Act related to careless driving.  Sergeant
Rusden advised that in general terms careless driving ranged from ‘without causing
serious injury’ at the lower end, which generally resulted in a fine with endorsement of
points on a driving licence.  It was noted that the Applicant had received 8 penalty points
on her licence. 
Councillor Blair sought and received confirmation from Sergeant Rushden that there
would have been an option for the Sheriff to instruct Ms Shephard to undertake a further
driving assessment.  He advised that from reading the report this was not done.  Sergeant
Page 24

Page 25

Rushden also advised that it was specialist Road Police Officers that attended the scene
and they would have been in the best position to make such a recommendation.  He
confirmed that no such recommendation was made. 
Councillor Blair questioned whether there were other incidents that had occurred on that
stretch of road around the same time.  Sergeant Rushden said he did not have any
specific details.  He pointed out that the area of road in question was notorious for having
serious accidents which tended to be down to driving too fast for the road conditions.  He
advised that at that section of road the corner was very tight, was surrounded by trees,
and, at points, narrow. 
Councillor Hardie commented that 8 points on a licence for an incident seemed quite a lot. 
He asked Sergeant Rushden if this reflected the severity of the incident.  Sergeant
Rushden said it suggested that the Sheriff had taken it seriously based on what was
presented in the report.  He advised that final comments in the report advised of careless
driving and that it was only luck they were not dealing with a more serious incident. 
SUMMING UP 
Police Scotland 
Sergeant Rushden advised that he had nothing further to add. 
Applicant 
Ms Shephard advised that she had passed Strone Point when the accident happened. 
She said that she was on a straight bit of the road when driving at 55 mph.  She said she
was not driving too fast going round the corner and that she did not know what had
caused the accident.  She pointed out that although it had not been a long time since
passing her test, she had done a lot of driving as part of her job.  She said that she had
panicked on that occasion. 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
Councillor Kain said he was minded to say yes to this.  He commented that there had
been a huge degree of honesty from the Applicant.  He said that anyone that has been
driving for a long time would know that there can be road conditions that would confound
you.  He noted that Police Scotland were not saying Ms Shephard was an unfit driver and
that he was minded to approve the application. 
Councillor Brown said that she had no reservations in approving this application.  She
advised that she appreciated that Police Scotland had to bring this information to the
Committee’s attention.  She said that she felt the Applicant had been open and honest
about what had happened and she confirmed that she would like to approve the
application. 
Councillor Hardie said that he thought this was a one off incident and that the Applicant
had been very honest about that.   He confirmed that he would have no problem with
approving this application. 
Page 25

Page 26

Councillor Green said that he agreed with Councillor Kain in terms of people driving for a
while and said he knew this type of accident could happen as it had happened to him.  He
advised that he could see this had shaken the Applicant and that she understood the
seriousness of the situation.  He confirmed that he would be happy to grant the
application. 
Councillor Blair agreed with his colleagues.  He referred to being a member of advanced
motorists and said that he still made mistakes while driving.  He asked if the Applicant
could reassure him that, under her own validation, she would take some sort of additional
driving assessment.  He said that would give reassurance to her passengers that she had
done something to ensure this type of incident did not happen again. 
Councillor Green pointed out that there was no opportunity in the procedure for the
Applicant to respond to Councillor Blair. 
Councillor Armour said he agreed with colleagues.  He said that this looked like a one off
and that everyone had probably been there.  He said that he thought the severity of points
and the fine showed that it was pretty serious and, as the Police Officer had said, it was
only pure luck that it was not more serious.  He said that he thought everyone could
accept that, and that he was sure that Ms Shephard also accepted that.  He advised that
like Councillor Blair he thought if Ms Shephard undertook an advanced driving
assessment this would do no harm and that he hoped that she would consider that. 
Councillor Howard agreed with all that had been said.  She said she was quite sure that
anyone in an accident like that would become a much better driver and be more aware of
what was going on.  She said she would be happy to grant the application. 
DECISION 
The Committee unanimously agreed to grant the renewal of Ms Shephard’s taxi driver
licence and noted that she would receive written notification of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 26

Page 27

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Dougie Philand 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
David Brown, Applicant
Sergeant Ben Rushden, Police Scotland 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey, Mark Irvine, Paul Kennedy, Liz McCabe and Peter Wallace. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
RENEWAL OF A TAXI DRIVERS LICENCE (D BROWN, DUNOON) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of audio
call and Mr Brown joined the meeting by telephone. 
Police Scotland also opted to proceed by way of audio call and Sergeant Ben Rushden
joined the meeting by telephone. 
The hearing procedure was followed with the Committee hearing from both the Applicant
and Police Scotland and receiving responses to their various questions. 
Motion 
To agree to continue consideration of this application and hold a fresh hearing in 3 months
time to give the Applicant the opportunity to reflect on concerns raised by the Committee
at this meeting. 
Moved by Councillor Gordon Blair, seconded by Councillor John Armour. 
Amendment 
To refuse to grant the renewal of the taxi driver licence on the grounds that the Applicant
was not a fit and proper person to hold the licence. 
Moved by Councillor Kieron Green, seconded by Councillor Graham Hardie.
Page 27 Agenda Item 3c

Page 28

A vote was taken by calling the roll. 
Motion   Amendment 
Councillor Armour  Councillor Green
Councillor Blair  Councillor Hardie
Councillor Brown
Councillor Howard
Councillor Kain
Councillor Philand 
The Motion was carried by 6 votes to 2 and the Committee resolved according. 
DECISION 
The Committee agreed to continue consideration of this application and hold a fresh
hearing in 3 months time to allow the Applicant to reflect on concerns raised by the
Committee at this meeting. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 28

Page 29

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 18 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Andrew Kain
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Stuart Mclean, Committee Manager
Fiona Macdonald, Solicitor
Mohammad Asif Nazir, Applicant 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Daniel Hampsey, Mark Irvine, Paul Kennedy and Liz McCabe. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: APPLICATION FOR
GRANT OF A TAXI CAR LICENCE (M A NAZIR, ROCHDALE) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant opted to proceed by way of audio
call and Mr Nazir joined the meeting by telephone. 
The Objector, Mr George Finlay, had advised that he would not be attending the hearing. 
He had asked that the Committee take into consideration his comments which were
contained within the Agenda pack for this meeting and these were duly noted during the
deliberations. 
The Chair outlined the procedure that would be followed and invited the Applicant to
speak in support of his application. 
APPLICANT 
Mr Nazir said he was grateful for the opportunity to discuss his application.  He advised
that the reason he was relocating was to be closer to his family.  He said that his mother
had passed away and that his Aunt lived in Cardross.   He said that he wanted to live near
his Aunt to give her emotional support and allow them to become closer as a family. 
He said that he and his wife were truly captivated by the area which had left a lasting
impression on them.  He said that the neighbourhood was very welcoming and friendly
towards them and supportive of their position.   
He advised that he had a cousin in Cardross who was a taxi driver and that he could see
the demand was there for more drivers in the area.  As part of his transition, he needed to
Page 29 Agenda Item 3d

Page 30

work and was looking for employment opportunities that would support his skills and
education.   He advised that he has worked as a private hire driver around Manchester for
almost 10 years and that he planned to continue this profession as he enjoyed being a taxi
driver and providing a sense of positivity to the community.  He said that he enjoyed the
flexibility of the work and the opportunity to connect with different people on a daily basis. 
He said that he was positive that this move would benefit him both personally and
professionally. 
He referred to the objection made to this application and advised that he totally
understood this.  He acknowledged there were a number of new taxis since the survey
was carried out.  He pointed out that demand was growing in the area and he expected it
to continue to rise.  He said that more people were returning to offices.  He advised that
customers wanted the convenience of time efficient transport which taxis provided. 
MEMBERS’ QUESTIONS 
Councillor Green sought and received confirmation from the Council’s Solicitor that there
were currently 49 taxis in the Helensburgh and Lomond area. 
SUMMING UP 
Applicant 
Mr Nazir said he looked forward to becoming an active and positive member of the
transport sector and he confirmed that he had received a fair hearing. 
DEBATE 
Councillor Brown said she had noted what Ms McDonald said about the current number of
taxis in Helensburgh and Lomond area not changing since last month.  She referred to a
hearing held in August when the Committee agreed to refuse a taxi car licence application
as it was felt that there was enough taxis in Helensburgh and to wait until the new survey
was carried out.  She asked if the Committee would be justified in allowing this one or
would they have to wait until the new survey was done before issuing anymore licences. 
She said that she thought Mr Nazir sounded like a great person and that she had no issue
with his application.  She sought clarification on whether this application would have to be
refused because the Committee had already taken a decision that there were enough
taxis.   
Ms McDonald advised that she was not in attendance at the last hearing Councillor Brown
was referring to.  She pointed out that a decision was made by the Committee back in
March to disregard the LVSA survey until a new survey was undertaken.  She said that
every case should be considered on its own facts and circumstances.  She advised that
the survey was not going to be carried out any time soon.  She confirmed that the advice
she would give the Committee today would be to consider the application on its own facts
and circumstances and decide whether to grant or not. 
Councillor Howard sought and received confirmation from Ms McDonald that no timescale
had been set for when a new survey would be carried out and that this was largely down
to capacity.  Ms McDonald advised that she would be concerned if the Committee agreed
not to issue any more taxi car licences until the survey was undertaken. 
Page 30

Page 31

Councillor Green said that he believed the decision taken at the previous hearing was in
regard to that particular application. 
Councillor Hardie said that he would be happy to grant the application due to the
expanding nature of Helensburgh and the likely expansion of Faslane Naval Base. 
Councillor Howard sought and received confirmation from Mr Nazir that he would be
working as an independent driver. 
Councillor Green advised that, taking account of the previous decision made, he had been
minded to refuse this application.  However, taking account of comments from Councillor
Hardie and Councillor Howard he thought there was a case for granting this application. 
Councillor Armour confirmed that he supported what Councillor Hardie had said and that
he would be happy to grant the application. 
Councillor Wallace asked if it would be better not to include the LVSA survey in future
agenda packs if the Committee have agreed not to take it into account.  Ms McDonald
said she would not disagree with that.  She said if Members wanted to move forward and
not have it included in future packs this may aid in any ongoing confusion around the
survey.  She said she would have no difficulty with having it removed.   
Councillor Wallace said it would be more useful to have it removed until such times as
there was a new document.  Councillor Green advised that he was minded to agree and
was sure that Officers would note that. 
DECISION 
The Committee unanimously agreed to grant a taxi car licence to Mr Nazir and noted that
he would receive written confirmation of this within 7 days. 
(Reference: Report by Head of Legal and Regulatory Support, submitted)
Page 31

Page 32

This page is intentionally left blank

Page 33

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS 
on FRIDAY, 20 SEPTEMBER 2024 
Present: Councillor Kieron Green (Chair) 
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Daniel Hampsey 
Councillor Graham Hardie
Councillor Fiona Howard 
Attending: Stuart McLean, Committee Manager
Alison MacLeod, Licensing Standards Officer
David Walker, Solicitor
Jennifer Shannon, Applicant
Greig Cavanagh, Applicant 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors John Armour, Gordon Blair,
Amanda Hampsey, Mark Irvine, Paul Kennedy, Dougie Philand and Peter Wallace. 
2. DECLARATIONS OF INTEREST 
Councillor Fiona Howard declared a non-financial interest in the application for grant of a
Short-Term Let License (G Cavanagh & J Shannon, Flat 1/3, 67 East Princes Street,
Helensburgh, G84 7DG) as she was a personal friend of the objector.  She confirmed that
she would leave the meeting and take no part the consideration of this application which
was dealt with at item 3 of this Minute. 
Councillor Fiona Howard, having declared an interest in the following item, left the meeting
at this point. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: THE CIVIC GOVERNMENT
(SCOTLAND) ACT 1982 (LICENSING OF SHORT-TERM LETS) ORDER 2022:
APPLICATION FOR GRANT OF A SHORT-TERM LET LICENCE (G CAVANAGH
& J SHANNON, FLAT 1/3, 67 EAST PRINCES STREET, HELENSBURGH, G84
7DG) 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicants had opted to proceed by way of
video call and Greig Cavanagh and Jennifer Shannon joined the meeting by MS Teams. 
Sue Smith, Objector, had opted to proceed by way of written submission. A copy of this
was contained within the agenda pack and was considered by Members as part of their
deliberations. 
The Chair invited the Licensing Standards Officer to speak to the terms of the report. 
Page 33 Agenda Item 3e

Page 34

Thereafter the procedure set out in Appendix 5 of the report was followed and the Chair
invited the Applicants to speak in support for their application. 
APPLICANT 
Ms Shannon spoke on behalf of herself and Mr Cavanagh.  She thanked the Committee
for taking the time to review the application. 
She addressed the concerns raised by the Objector and stated that Sue Smith had
acknowledged that the inspection report was satisfactory.  She advised that following the
objections that were raised they had fitted carpets in the living area, hall and bedroom but
felt it was unreasonable to be asked to carpet the kitchen. 
In respect of the objection raised about the bins she stated that the objection was the first
they had been told that the location of the bins was not suitable and that they had been
sited in the same location since they bought the property in November 2023.  She advised
they had moved the bins to beside the outdoor staircase but this had not resolved the
objection. She advised that they had asked the Objector where she would like the bins to
be located but she had offered no recommendations.  The Objector had suggested they
install a black bottle bin, which they had, and all bins had been clearly labelled with the flat
number. 
Ms Shannon stated that the parking for the property was on a main road with no double
yellow lines and since purchasing the property they had not experienced any issues with
parking.  Due to the size of the property they would only expect 1 or 2 cars to require
parking at any one time. 
She advised that they had employed a Property Management Company to ensure the
smooth operation of the Short-Term Let.  Under their guidance they had produced a guest
handbook and installed a Ring doorbell camera.  The camera would allow them to monitor
the occupancy numbers and view all activity on the external staircase at the entrance to
the property. 
She stated that guests would be given the telephone number of the Property Management
Company along with her own mobile number.  Due to her close proximity to the property
she would be able to attend in person within 5 minutes should any issues arise. 
Ms Shannon advised that the Objectors flat had previously been used as a commercial
property but upon changing the use to residential the Objector had designed the layout to
have the bedroom beside the external staircase.  As well as the window beside the
staircase there was another which looks directly on to the main street. 
She advised that the Objector had acknowledged that the Applicants had greatly improved
the interior of the property.  In respect of the exterior issues such as roughcasting and
guttering, the Objector had indicated that the condition had deteriorated over a number of
years.  She stated that she had obtained a quote to improve the roughcasting but the
Objector had been unwilling to split the cost of the work to the areas which were shared
responsibility. 
She stated that she was aware that another property in the block had applied for a Short-
Term Let Licence and had not received any objections despite also having access to the
shared garden and walkway. 
Page 34

Page 35

Ms Shannon stated that they had tried to address all the concerns which were raised but it
had not made any difference and she felt the Objector was using the application to make
them pay for the totality of the exterior works. 
MEMBERS’ QUESTIONS 
Councillor Brown asked what restrictions they were prepared to place on the use of the
shared garden.  Ms Shannon advised that initially they were prepared to surrender their
use of the garden but as the other Short-Term Let property had access they did not now
feel that was a fair solution. 
Councillor Hardie asked if their relationship with the neighbour was cordial.  Ms Shannon
advised that they had previously had a very good relationship but it had deteriorated when
they asked her to contribute to the cost of the roughcasting, and that was when the
objection had been submitted. 
Councillor Green asked if the kitchen and dining area still had hard flooring.  Ms Shannon
advised that the living area, kitchen and dining area were open plan and they had been
carpeted up to the kitchen units but she felt it was unreasonable to ask for the kitchen to
be carpeted where there would be food preparation.  She stated that it was a small portion
of the area above the Objectors bedroom that had hard flooring and that the Objector had
previously advised that her bed was situated under the living area which had been
carpeted. 
SUMMING UP 
Applicant 
Ms Shannon advised that they were happy to contribute to the upkeep of the exterior of
the building and that their main focus was looking after the property and their guests. 
Councillor Green asked the Applicants if they felt they had received a fair hearing to which
both confirmed they had. 
DEBATE 
Councillor Hardie stated he felt the applicant had been responsible in addressing all the
issues that had been raised and he was happy to grant the licence. 
Councillor Hampsey stated he agreed with Councillor Hardie and was minded to grant the
licence. 
Councillor Forrest stated that as the Applicant had addressed every objection she was
happy to grant the licence. 
Councillor Brown said that as the Applicant had taken on board all of the issues raised she
was happy to grant the licence. 
Councillor Green stated that as he lived in a close he had some sympathy with the issues
raised relating to noise and the external staircase, however, it was clear that the Applicant
had addressed all concerns are far as was practically possible and he was therefore
happy to grant the licence. 
Page 35

Page 36

DECISION 
The Committee agreed to grant a Short-Term Let Licence subject the inclusion of
additional conditions in respect of Antisocial Behaviour; Privacy and Security; Noise
Control in Flatted Premises and Littering and Waste Disposal. 
(Reference: Report by Head of Legal and Regulatory Support, submitted) 
Page 36

Page 37

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE          
SERVICES AND LICENSING
COMMITTEE 
LEGAL AND REGULATORY
SUPPORT 
23 OCTOBER 2024
CIVIC GOVERNMENT (SCOTLAND) ACT 1982
TAXI FARE SCALE REVIEW 
1.0 EXECUTIVE SUMMARY             
In terms of Section 17 of the Civic Government (Scotland) Act 1982, the Local Authority
requires to fix maximum fares and other charges in connection with the hire of taxis
operating in their area and to review the scales for taxi fares and other charges on a
regular basis.  The fares were last reviewed by members on 21st June 2023 and took
effect on 22nd October 2023.   
A letter will be issued to all taxi operators on week commencing 28th October 2024
inviting their comments by 2nd December 2024.  A further report will be placed before
the Committee at their meeting on 18th December 2024 detailing the comments
received from the taxi operators. 
2.0  RECOMMENDATIONS 
The Committee are asked to: 
a) Agree to commence the review of fares in order that this can be completed within the
18 months required in terms of the Act.   
b) Agree that the consultation required in terms of the Act will be in writing.  
Page 37 Agenda Item 4

Page 38

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE          
SERVICES AND LICENSING
COMMITTEE 
LEGAL AND REGULATORY
SUPPORT 
23 OCTOBER 2024  
CIVIC GOVERNMENT (SCOTLAND) ACT 1982
TAXI FARE SCALE REVIEW 
1. 
1.1 
1.2 
2. 
2.1 
3.  
3.1 
SUMMARY 
In terms of Section 17 of the Civic Government (Scotland) Act 1982, the
Local Authority requires to fix maximum fares and other charges in
connection with the hire of taxis operating in their area and to review the
scales for taxi fares and other charges on a regular basis.  The fares were
last reviewed by members on 21st June 2023 and took effect on 22nd 
October 2023 
A letter will be issued to all taxi operators week commencing on 28th
October 2024 inviting their comments by 2nd December 2024.  A further
report will be placed before the Committee at their meeting on 18th
December 2024 detailing the comments received from the trade. 
RECOMMENDATIONS 
The Committee are asked to 
a) Agree to commence the review of fares in order that this can be 
completed within the 18 months required in terms of the Act.   
b) Agree that the consultation required in terms of the Act will be in 
writing.   
DETAIL 
Section 17 of the Civic Government (Scotland) Act 1982 states that 
“the licensing authority must fix scales for the fares and other charges
within 18 months beginning with the date on which the scales came into
effect”.  In terms of the last review the fares came into force on 22nd
Page 38

Page 39

3.2 
3.3 
3.4 
October 2023.  The next fares scale will need to come into force in April
2025.  Therefore the review process would require to commence in
October 2024. 
At the meeting on 21st June 2023 the committee agreed that there be no
change to the existing scales and that this will take effect from 22 October
2023; 
In terms of Section 17 of the Act in carrying out a review of taxi fares, the
licensing authority must –
a) Consult with persons or organisations appearing to it to be, or to be
representative of, the operators of taxis operating within its area.
b) Following the consultation –
(i) Review the existing scales
(ii) Propose new scales (whether at altered rates or the same
rates. 
The Act does not stipulate how the consultation should be effected. 
4. 
4.1 
A) 
B) 
5.
CONCLUSION 
Members are invited to agree that; 
The next taxi fare review should commence in order that it can be
completed within 18 months as required by the 1982 Act. 
and 
Agree that the consultation required in terms of the Act will be in writing. 
IMPLICATIONS 
5.1 Policy- None 
5.2 Financial -none
5.3 Legal – The Council require to review taxi fares in terms of the Civic 
Government (Scotland) Act 1982
5.4 HR -none
5.5 Fairer Scotland Duty:-none
Page 39

Page 40

5.5.1 Equalities - protected characteristics-none
5.5.2 Socio-economic Duty-none
5.5.3 Islands -none
5.6 Climate Change-none
5.7 Risk-none
5.8 Customer Service-none 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
Policy Lead: Cllr Kieron Green 
For further information contact: Sheila MacFadyen, Senior Solicitor
Tel: 01546 604265 Email Sheila.macfadyen@argyll-bute.gov.uk 
Page 40

Page 41

Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West Of Lagganulva Farm, Ulva Ferry, Isle of Mull 
SUPPLEMENTARY REPORT NO. 5 
(A)  INTRODUCTION 
This application was presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024, where the Committee agreed to continue
consideration of the application to the meeting of the PPSL Committee on 19 June
2024. Supplementary Reports were presented to the Planning, Protective Services
and Licensing (PPSL) Committee on 19 June 2024, 21 August 2024 and 18
September. 
The purpose of this current Supplementary Report is to bring Member’s attention to
late representations received regarding the proposed development and to update
Members on the submission of the further information requested in relation to Policy
83 of Local Development Plan 2, as addressed in Section B below. 
(B) REPRESENTATIONS     
Late Representations 
Three late objections and two late representations have been received to the
application. 
Objections have been received from: 
Mr Tim McDowell, Corkamull Cottage, Ulva Ferry, Isle of Mull, PA73 6LY (12.06.2024)
Christopher Nicholson of Scottish Tenant Farmers Association, Kidsdale Farm,
Whithorn, Wigtownshire, DG8 8JU (18.06.2024)
Mrs Philippa Lanteri, Langamull, Calgary, Isle of Mull, PA75 6QY (24.06.2024) 
Representations have been received from: 
Page 41 Agenda Item 5

Page 42

Classification: OFFICIAL
Moray Finch of Mull and Iona Community Trust, An Roth Community Enterprise
Centre, Craignure, Isle of Mull, PA65 6AY (18.06.2024)
John Maughan of Mull Community Council, The Shieling, Croggan, Isle of Mull, PA63
6AH (20.08.2024) 
Summary of Issues Raised 
• The existing barn and adjacent land is strategically important to the operation
of the farm due to its use as an isolation unit for bio-security purposes for stock.
The land and buildings are separated from the main farm buildings and are
therefore suited to use as an isolation unit. Farming operations would be
negatively impacted by the loss of strategically important land and buildings.
The existing barn is in good repair and is being used for its original purpose.
The land adjacent to the barn is better quality land and as there is very limited
amounts of better land, it should be protected for agriculture. The farm steading
is an example of 19th Century architecture remaining in its original use. This is
a rare and irreplaceable asset and is historically important. 
Comment: The barn the subject of this planning application is not listed or
protected in any way. Neither is it located within a conservation area. It could,
therefore, be demolished at any time without reference to the planning
authority. In addition, none of the land surrounding the building and proposed
to be included within its curtilage is classed as ‘prime agricultural land’. The
ceasing of the agricultural use of the existing barn does not form a material
planning consideration, however, the applicant submitted a prior notification
application to erect a building as 'agricultural permitted development' on land
to the north of Lagganulva Farm (our reference 24/00259/PNAGRI). The
application was determined as permitted development in terms of Class 18 of
the Town and Country Planning (General Permitted Development) (Scotland)
Order 1992 as amended. Given the limited scale of the proposed development
and as it would not impact upon prime agricultural land as defined within
National Planning Policy, and with due consideration to the significant extent of
the wider agricultural landholding, the proposed development is, subject to a
condition to secure the exact details of a reduced residential curtilage,
considered to adhere to stipulations of NPF4 Policy 5 and LDP2 Policy 83. 
• The proposed development should be assessed against LDP2 Policy 11. 
Comment: The existing barn would be retained as part of the development
proposal. It is proposed to repair and repoint the existing stone walls of the barn
and make use of the existing tiled roof. The alterations to the existing barn
would be limited to repairs to the walls and roof, the installation of windows and
doors, and downtakings to facilitate the adjoining of the proposed extension. In
this way, the proposed development would largely preserve the existing
building, thereby retaining its character and appearance in accordance with the
provisions of Policy 32. 
• Mature oak trees will come under development pressure during the proposed
build and during the operational phase of the development. These trees are
rare and a Tree Preservation Order is a reasonable and minimum mitigation to
prevent their loss. 
Comment: The proposed extension to the existing barn would be sited towards
the southeast corner of the application site, away from the mature trees which
Page 42

Page 43

Classification: OFFICIAL
are sited adjacent to the northwest of the existing barn. The submitted
information advises that any excavation works in the area adjacent to the tree
protection zone would be excavated by hand. The application does not propose
any works to the trees on site. However, given the presence of established
mature trees at the site, a suitable condition is required to secure the provision
of a scheme for the retention and safeguarding of trees during construction
work, to include detail of any proposed tree works and a programme of
measures for the protection of trees during construction works. 
• Given the proximity to a working farmyard, the proposed development has the
potential to cause conflict due to the noise and workings of a farmyard. The
proposed development may undermine the viability of an existing business and
limit the ability of the business to diversify in future. 
Comment: The application site is located southwest of the existing farm. Whilst
the application site and the proposed development would be located in
proximity to the agricultural business, the proposed development would be
sited at a sufficient distance to ensure that there would be no impact upon
neighbour amenity with regard to overlooking, visual intrusion or shading. In
terms of ‘bad neighbour’ development, the application site would be physically
separate from the established farm, which is sited on the opposite side of the
public road. The proposed development would be well contained within the
application site and would not share access with the farm, nor would the
application site be functionally associated with the agricultural business. The
proposed development would be sufficiently distinct from the farm and its
associated activity such that it is not considered that there would be any
adverse impacts upon the sensitive receptor of the dwellinghouse with regard
to noise disturbance, odour pollution or light pollution. Any future applications
for diversification of the farm business will be assessed on their own merits. 
• The agricultural tenant is the interested party most affected by the proposed
development. The tenant should be allowed to represent themselves to the
Planning Committee. 
Comment: Both the applicant and the tenant farmer have had opportunity to
submit information to address the impact of the proposed development in
relation to LDP2 Policy 83. The loss of the agricultural use of the existing barn
is not, in itself, a material planning consideration as it is a privately owned
building that is not afforded any protection status. Whilst officers have every
sympathy with the tenant farmer, the applicant has, at the request of the
planning authority, addressed this concern through the provision of a
replacement agricultural building, as detailed within application reference
24/00259/PNAGRI. The applicant has also agreed to reduce the amount of the
surrounding land to be given over to residential curtilage. Appropriate
conditions will secure the provision of a replacement barn and will secure the
exact details of a reduced curtilage to be associated with the proposed
dwellinghouse. 
• The development would become a holiday home or holiday rental. The building
would be renovated for use as a short term let rather than much needed
affordable housing. A Rural Housing Burden should be imposed. 
Comment: The proposal the subject of this planning application is seeking to
secure planning permission for the conversion of and extension to the existing
Page 43

Page 44

Classification: OFFICIAL
stone barn to form a dwellinghouse. The Planning Authority is satisfied that the
existing barn, and the application site, is able to successfully accommodate a
suitably sited, scaled and designed extension which would facilitate the
conversion of the existing stone barn to form a dwellinghouse which would
relate to the established appearance of the surrounding area. The application
relates to the provision of a dwellinghouse and does not relate to short term let
accommodation. Whilst it is acknowledged that the future occupancy or tenure
of the dwellinghouse is unknown, the Council currently has no planning policies
that could control this and, in that regard, this is not considered a planning issue
of any overriding material significance. 
• A modern replacement farm building would have a landscape impact upon the
scenic setting. 
Comment: The applicant submitted a prior notification application to erect a
building as 'agricultural permitted development' on land to the north of
Lagganulva Farm (our reference 24/00259/PNAGRI). The application was
determined as permitted development in terms of Class 18 of the Town and
Country Planning (General Permitted Development) (Scotland) Order 1992 as
amended. The report accompanying application 24/00259/PNAGRI considered
that the erection of an agricultural building within the holding would have no
materially negative visual impact on the environment or the wider landscape
including the National Scenic Area. The replacement agricultural building is to
be sensitively sited within the existing farm complex where it would be largely
screened from the public realm by existing built development. The replacement
agricultural building would instead relate both visually and functionally to
existing buildings associated with the agricultural business and the scale of the
replacement agricultural building would be commensurate with the functional
need for the building and its setting in the landscape. 
(C)       REQUESTED INFORMATION 
The proposal the subject of this planning application is seeking to secure planning
permission for the conversion of, and extension to, an existing barn to form a
dwellinghouse, along with associated access and infrastructure works. 
Further information has been requested from both the applicant and the tenant farmer
in relation to the impact of the proposed development with regards to the provisions of
LDP2 Policy 83 – Safeguarding Agricultural and Croft Land.   
LDP2 Policy 83 relates to Safeguarding Agricultural and Croft Land and requires the
applicant to demonstrate that new development proposals minimise the loss of
agricultural land including in-bye land and croft land. The Policy states that new
development proposals will not be supported where this would result in: 
a) the loss of agricultural land where it weakens the viability of the agricultural/croft
unit;
b) the fragmentation of field systems and the integrity of the farm unit;
c) the loss of access to field systems. 
The Policy further states that if development proposals involve any of the foregoing,
they will only be deemed acceptable where the applicant can adequately demonstrate
that: 
Page 44

Page 45

Classification: OFFICIAL
d) there exists a proven and justified significant economic, environmental or social
wider community interest to allow the development to proceed; and
e) there is no alternative viable land outwith the agricultural or croft land concerned
for the development to proceed. 
The development proposed by the current application seeks to develop a rough area
of ground adjacent to the existing barn. The total extent of the red line site boundary
comprises approximately 0.4 hectares, and the wider farm extent extends to
approximately 1190 hectares. 
A specialist Agricultural Report has been submitted on behalf of the applicant to assess
the potential impact of the development on the ongoing viability of the tenant’s farming
business. The information within the submitted Agricultural Report is summarised as
follows: 
• The land at the farm contains land classifications ranging from ‘5.2 – Land
capable as use as improved grassland. Few problems with pasture
establishment but may be difficult to maintain’ to ‘6.3 Land capable of use as
rough grazing with low quality plants’. 
• The land is managed for grazing with some of the lower-ground fields being of
better quality, improved grasslands. The remainder of the farm is formed by
rough hill grazings with some native woodlands. 
• The existing barn is used as an isolation unit for animals brought onto the farm,
required for biosecurity and animal health purposes. The farm includes other
buildings on the same side of the road as the farmhouse which could be used
for the same purpose if required. 
• The applicant proposes to provide a new, larger replacement building for the
tenant; the proposed building would be of a scale that could accommodate an
isolation pen. The new building would be sited on the same side of the road as
the existing farmhouse and other associated buildings, and would be more
suited to modern agriculture. 
• The area of land forming part of the proposal to facilitate the development
extends to approximately 1 acre. Whilst the land comprises in-bye land, the
area does not have a field boundary and is open to the foreshore and road.
The ground conditions comprise bracken and other long, dense vegetation
offering limited, if any, grazing of any quality. The proposed curtilage area
would represent 0.04% of the entire farm area. The proposed replacement
agricultural building, as approved as 'agricultural permitted development',
would offer the farming business the potential for time savings, more efficient
handling of stock and therefore the potential to enhance farm viability. 
• Given the above, the Report concludes that the proposed development does
minimise the loss of agricultural land as required by Policy 83 and would not
weaken the viability of the agricultural unit. The site does not form part of a field
unit and is sited separately from the main farmstead such that the proposal
would not fragment the integrity of the unit. There would be no loss of access
to field systems as the majority of the site does not form an enclosure. 
A Farm Impact Report has been submitted on behalf of the tenant farmer, an objector
to the development. The report provides an assessment of the impact of the proposed
Page 45

Page 46

Classification: OFFICIAL
development on farm economics and operations with reference to relevant planning
policy. The information within the submitted Farm Impact Report is summarised as
follows: 
• The proposed development would introduce a sensitive receptor which would
prevent the adjacent land being used for current forms of production and
constrain future opportunities such that it is considered to amount to the loss of
agricultural land and the weakening of the viability of the agricultural unit. 
• The siting of the proposed development in proximity to the existing agricultural
activity would have an adverse impact upon neighbour amenity where the
presence of a new dwelling would compromise existing and constrain future
operations. 
• The proposed replacement agricultural building is unsuitable in terms of scale
and location. 
• The boundary of the curtilage of the proposed dwelling should be of a solid
construction to form a visual barrier to reduce the likelihood of activity within
the curtilage of the proposed dwelling from disturbing livestock. 
• The information submitted by the applicant discusses an area of land which
does not form part of the current application. The loss of this area may present
a different set of operational considerations. 
• The farm has 22 hectares of improved in-bye land. 
• The tenant has not agreed to the replacement agricultural building and the
remainder of the steading is currently in use such that they could not be used
to replace the barn the subject of this current planning application. 
• The farm struggles to maintain stock due to the low quality of its unimproved
land and any reduction in improved land would be detrimental to farm output.
Topography and tree cover provide the field with more shelter than the farms
other in-bye land. A public road isolates the field and barn from the rest of the
steading; these characteristics make the field economically important and
uniquely suited to uses where separation is advantageous or essential. This
facility improves farm business efficiency and flexibility. 
• The loss of the field would require flock size to be reduced and as a result the
tenant would lose associated support payments and would suffer reduced
productivity. 
• The proximity of the proposed dwelling to the field would not allow for the field
to remain in full agricultural production or allow it to be used without constraint
as livestock management practices would impact the sensitive receptor of the
proposed dwellinghouse. This would effectively amount to a loss of land. 
• There are alternative locations where poorer quality land could be developed.
There are also a number of unused buildings falling into disrepair that could be
converted. 
• The existing building is a key asset in the operation of the farm and is suitable
for the purposes for which it is used. 
Page 46

Page 47

Classification: OFFICIAL 
• The location proposed by the applicant for the replacement barn is currently in
use and a building would displace existing vehicle parking and impinge on
manoeuvring space for vehicles. The proposed replacement shed would not be
sufficient to fulfil the purpose of providing replacement livestock housing along
with machinery and feed storage. 
• The presence of a dwellinghouse in proximity to the existing farm could hinder
future diversification development. Pig and poultry enterprises could be
constrained by a near neighbour. 
• The proposed dwelling would be located adjacent to a farmyard with
machinery, workshop, livestock accommodation kennelled dogs and a poultry
flock. Noise disturbance arising from the farm and livestock activity would
adversely impact upon the amenity of the occupants of the proposed dwelling.
Livestock and farm activities would occur immediately adjacent to the proposed
dwelling and this would present the tenant with health and safety management
concerns. 
• The economic viability of the farm could be affected by a close neighbour
constraining current use and future diversifications of the farm. 
The supporting information of Local Development Plan 2 Policy 83 advises that Argyll
and Bute has a significant area of agricultural land which is predominantly rough and
hill grazing, with a very limited amount of good quality land. The national scale land
capability for agriculture map provides information on the types of crops that may be
grown in different areas dependent on environmental and soil characteristics. In this
instance, the development proposed by the application seeks to develop an existing
barn and a rough area of adjacent ground where the application site falls within Class
5.2.  The land within this Class is defined as being capable of use as improved
grassland, where pasture establishment may be difficult to maintain. For planning
purposes, National Planning Framework 4 Policy 5 sets out ‘Prime Agricultural Land’
as being Class 1, 2 or 3.1 in the land capability classification for agriculture. Given that
the application site falls within Class 5.2, the proposed development would not
therefore impact upon prime agricultural land as set out within National Planning
Policy. 
Notwithstanding the above and given the concerns raised by the tenant farmer, it is
proposed to include a condition to secure the exact details of a reduced residential
curtilage for the proposed dwellinghouse, to be submitted to and approved by the
Planning Authority prior to the commencement of development. 
Local Development Plan Policy 83 expects applicants to demonstrate that new
development proposals minimise the loss of agricultural land including in-bye land and
croft land. In this instance, subject to the inclusion of the aforementioned condition, it
is considered that sufficient measures have been taken to minimise the loss of
agricultural land. The proposed development relates to the change of use, and
extension to, an existing barn. LDP2 Policy 83 does not relate to buildings and instead
seeks to safeguard agricultural and croft land. The consideration of the conversion of
the existing barn would not therefore fall within the scope of NPF4 Policy 5 or LDP2
Policy 83. Sufficient and commensurate provision has been made to address the terms
of LDP2 Policy 83 through the inclusion of a planning condition to define the exact
extent of a reduced residential curtilage. Given the limited scale of the proposed
Page 47

Page 48

Classification: OFFICIAL
development and as it would not impact upon prime agricultural land as defined within
National Planning Policy, and with due consideration to the significant extent of the
wider agricultural landholding, the proposed development is, subject to appropriate
conditions, considered to adhere to stipulations of NPF4 Policy 5 and LDP2 Policy 83. 
The ceasing of the agricultural use of the existing barn does not form a material
planning consideration, however, the applicant submitted a prior notification
application to erect a building as 'agricultural permitted development' on land to the
north of Lagganulva Farm (our reference 24/00259/PNAGRI). The application was
determined as permitted development in terms of Class 18 of the Town and Country
Planning (General Permitted Development) (Scotland) Order 1992 as amended. The
report accompanying application 24/00259/PNAGRI considered that the erection of an
agricultural building within the holding would have no materially negative visual impact
on the environment or the wider landscape including the National Scenic Area. The
replacement agricultural building is to be sensitively sited within the existing farm
complex where it would be largely screened from the public realm by existing built
development. The replacement agricultural building would instead relate both visually
and functionally to existing buildings associated with the agricultural business and the
scale of the replacement agricultural building would be commensurate with the
functional need for the building and its setting in the landscape. 
Provision has therefore been made for an alternative building for use by the tenant
farmer on land within the farm steading and closer to the existing buildings than the
barn the subject of this application. The provision of the alternative agricultural building
can be secured through the use of a suitable planning condition which would require it
to be available for use by the tenant farmer before any works on the conversion of the
existing barn commence. The terms of Condition 15 – Phasing of Development,
relative to the application have been amended to allow for increased flexibility for an
alternative scheme for the provision of the replacement barn. 
The full list of conditions, to include the amendment to the terms of Condition 15 and
the inclusion of a condition to secure the exact details of the residential curtilage, is
appended to this report. 
_________________________________________________________________________ 
(D) RECOMMENDATION   
That Members note the content of this report which provides a further detailed
assessment of the proposed development in relation to NPF4 Policy 5 and LDP2 Policy
83. 
The recommendation of the Planning Authority remains that planning permission be
granted subject to the conditions and reasons appended to Supplementary Report No.
5. 
_________________________________________________________________________ 
Author of Report: Emma Shaw   Date: 03.10.2024 
Reviewing Officer:    Tim Williams               Date: 03.10.2024  
Fergus Murray 
Head of Development and Economic Growth 
Page 48

Page 49

Classification: OFFICIAL
APPENDIX A – CONDITIONS AND REASONS RELATIVE TO APPLICATION NO.
23/00185/PP. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00185/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 01.02.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Drawings
1 (downtakings in
red)
PL_003  02.02.2023
Existing Drawings
2 (downtakings in
red)
PL_004  02.02.2023
Proposed
Elevations
PL_008  02.02.2023
Proposed Plan PL_006  02.02.2023
Proposed Section
A-A South
Elevation and
Section B-B
PL_007  02.02.2023
Proposed Renders PL_009  02.02.2023
Proposed Interior
Renders 
PL_010  02.02.2023
Existing Site Plan PL_002  27.02.2023
Proposed Site Plan PL_005  27.02.2023
Proposed Plan PL_006  27.02.2023
Location Plan PL_001  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
Page 49

Page 50

Classification: OFFICIAL
3. Sustainable Drainage System 
Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small
Scale Development – www.sepa.org.uk .  
4. Landscaping and Biodiversity Enhancement 
No development shall commence until a scheme of biodiversity protection and
enhancement, boundary treatment, surface treatment and landscaping has been
submitted to and approved by the Planning Authority. The scheme shall include details
of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding
areas; 
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels; 
iv) Proposed hard and soft landscape works; and 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate.
Page 50

Page 51

Classification: OFFICIAL 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
5. Junction with Public Road 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD08/004a and shall
include visibility splays of 2.4 metres to point X by 75 metres to point Y from the centre
line of the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the formation/alteration
of a junction with the public road. 
• The access shall be constructed and drained to ensure that no surface water
is discharged onto the public road.  
6. Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety.  
7.  Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Page 51

Page 52

Classification: OFFICIAL 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
• Regulatory requirements for private water supplies should be discussed with
the Council’s Environmental Health Officers in the first instance.  
8. Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
roof coverings and external walls have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the Planning
Authority. 
Reason: In order to integrate the development into its surroundings.  
9. PP - Removal of PD Rights – Dwellinghouse 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1D, 2B, 3A,
3B, 3C, 3D and 3E of the aforementioned Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse. 
Page 52

Page 53

Classification: OFFICIAL
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission. 
Reason: To maintain the integrity and architectural value of this bespoke
dwellinghouse and to protect it and its immediate setting against inharmonious
additions and accretions and to protect the sensitive area and the setting of the
proposed dwellinghouse in the interest of visual amenity and public health, from
unsympathetic siting and design of developments normally carried out without
planning permission; these normally being permitted under Article 2(4) of the Town
and Country Planning (General Permitted Development) (Scotland) Order 1992 (as
amended).  
11. Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of nesting birds has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority. In circumstances where species of interest are identified as being
present, or at risk from construction works, the survey shall further provide suggested
avoidance and or mitigation measures, including timing constraints, to address such
presence or risk. The development shall be implemented in accordance with the
measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation.  
12.  Implement/Operate Development in Accordance with Identified Mitigation
Measures 
Notwithstanding the provisions of Condition 1, the development shall be undertaken
in accordance with the mitigation measures set out in the documents titled ‘Preliminary
Ecological Appraisal’ dated August 2022 and ‘Otter & Bat Surveys Report’ dated
September 2022.   
Reason: In order to protect natural heritage assets in the interest of nature
conservation.  
13. Contaminated Land 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on site, a scheme will be submitted by the Developer
(at their expense) to identify and assess potential contamination on site.  No
Page 53

Page 54

Classification: OFFICIAL
construction work shall commence until the scheme has been submitted to, and
approved, by the Planning Authority, and is thereafter implemented in accordance with
the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including PAN 33 (2000) and BS10175:2011 or,
in the event of these being superseded or supplemented, the most up-to-date
version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope
and method of recommended further investigations shall be agreed with the
Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken
in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents. 
c) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works, and proposed
verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
14.  Tree Retention and Protection 
No development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location and canopy spread of
trees to be retained as part of the development; 
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread of each tree in accordance with BS 5837:2005 “Trees in Relation to
Construction”. 
Page 54

Page 55

Classification: OFFICIAL 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation.  
15.  Phasing of Development 
No development shall commence until such time as the associated replacement
agricultural building (either as granted under prior notification ref. 24/00259/PNAGRI;
or subsequently renewed/amended, or an alternative scheme for the provision of a
replacement building that has been acknowledged as such in writing by the planning
authority) has been erected and made available for agricultural use in the management
of Lagganulva Farm. 
Reason: In order to ensure that the development of the existing barn the subject of
this current planning permission is delivered in accordance with the stated
management and development of the remainder of the agricultural holding. 
16. Restricted Curtilage 
No development shall commence until details of a reduced residential curtilage for the
proposed dwellinghouse has been submitted to and approved by the Planning
Authority. The development shall thereafter be completed in strict accordance with
such details as are approved. 
Reason: To assist with the integration of the proposal and to safeguard agricultural
land. 
Page 55

Page 56

This page is intentionally left blank

Page 57

Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West of Lagganulva Farm, Ulva Ferry, Isle of Mull
_________________________________________________________________________
SUPPLEMENTARY REPORT NO. 4 
(A)  INTRODUCTION 
This application was presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024, where the Committee agreed to continue
consideration of the application to the meeting of the PPSL Committee on 19 June
2024. Supplementary Reports were presented to the Planning, Protective Services
and Licensing (PPSL) Committee on 19 June 2024 and 21 August 2024. 
The purpose of this current Supplementary Report is to update Members on the status
of the further information requested in relation to Policy 83 of Local Development Plan
2, as addressed in Section B below. 
(B) REQUESTED INFORMATION 
Further information has been requested from both the applicant and the tenant farmer
in relation to the impact of the proposed development with regards to the provisions of
LDP2 Policy 83 – Safeguarding Agricultural and Croft Land.  Additional time is required
to gain the requested information from the relevant parties and to subsequently assess
the information with regards to the provisions of LDP2 Policy 83. 
_________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report and continue consideration of this
application when the requested information has been received and assessed. 
______________________________________________________________________ 
Author of Report: Emma Shaw   Date: 04.09.2024 
Reviewing Officer: Kirsty Sweeney           Date: 04.09.2024  
Fergus Murray 
Head of Development and Economic Growth 
Page 57

Page 58

This page is intentionally left blank

Page 59

Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West of Lagganulva Farm, Ulva Ferry, Isle of Mull
_________________________________________________________________________
SUPPLEMENTARY REPORT NO. 3 
(A)  INTRODUCTION 
This application was presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024, where the Committee agreed to continue
consideration of the application to the meeting of the PPSL Committee on 19 June
2024. A Supplementary Report was presented to the Planning, Protective Services
and Licensing (PPSL) Committee on 19 June 2024. 
The purpose of this current Supplementary Report is to update Members on the status
of the further information requested in relation to Policy 83 of Local Development Plan
2, as addressed in Section B below. 
(B) REQUESTED INFORMATION 
Further information has been requested from both the applicant and the tenant farmer
in relation to the impact of the proposed development with regards to the provisions of
LDP2 Policy 83 – Safeguarding Agricultural and Croft Land. 
Additional time is required to gain the requested information from the relevant parties.  
_________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report and continue consideration of this
application to the meeting of the PPSL Committee on 18 September 2024 to allow for
the requested information to be prepared. 
______________________________________________________________________ 
Author of Report: Emma Shaw   Date: 12.08.2024 
Reviewing Officer: Sandra Davies           Date: 12.08.2024  
Fergus Murray, Head of Development and Economic Growth 
Page 59

Page 60

This page is intentionally left blank

Page 61

Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West of Lagganulva Farm, Ulva Ferry, Isle of Mull
_________________________________________________________________________
SUPPLEMENTARY REPORT NO. 2 
(A)  INTRODUCTION 
This application was presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024, where the Committee agreed to continue
consideration of the application to the meeting of the PPSL Committee on 19 June
2024. 
The purpose of this Supplementary Report is to update Members on the status of the
further information requested in relation to Policy 83 of Local Development Plan 2, as
addressed in Section B below. 
(B) REQUESTED INFORMATION 
Further information has been requested from both the applicant and the tenant farmer
in relation to the impact of the proposed development with regards to the provisions of
LDP2 Policy 83 – Safeguarding Agricultural and Croft Land. 
Additional time is required to gain the requested information from the relevant parties.  
_________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report and continue consideration of this
application to the meeting of the PPSL Committee on 21 August 2024 to allow for the
requested information to be prepared. 
______________________________________________________________________ 
Author of Report: Emma Shaw   Date: 10.06.2024 
Reviewing Officer: Tim Williams               Date:  10.06.2024  
Fergus Murray 
Head of Development and Economic Growth 
Page 61

Page 62

This page is intentionally left blank

Page 63

Argyll and Bute Council
Development & Economic Growth   
Delegated or Committee Planning Application Report and Report of handling as required
by Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle
____________________________________________________________________________ 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West Of Lagganulva Farm, Ulva Ferry, Isle of Mull
____________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
(A)  INTRODUCTION 
This application is to be presented to the Planning, Protective Services and Licensing
(PPSL) Committee on 22 May 2024. 
The purpose of this Supplementary Report is to bring Member’s attention to late
representations received regarding the proposed development which is addressed in
Section B below.  
______________________________________________________________________ 
(B) REPRESENTATIONS     
A late representation has been received from Cllr Willie Hume, local member for Oban
South and the Isles (received 21st May 2024) raising the following issues: 
“I have been contacted by one of my constitutions, all be it very late in the day regarding
Planning Application 23/00185/PP. 
A few points I would like to highlight before tomorrows meeting. 
1 The application states that the house will connect to a public water supply, there is no
public water supply in that area.
2 The electricity supply is on the opposite side of the road, the application does not state
if the supply will be overhead or underground. If it is poles and overhead wires this will
impact the surrounding landscape.
3 The proposed development is contrary to polices LDP Strat 1 and LPD 9 of the local
development plan, I would strongly recommend a SITE VIST before any decision is made.” 
Comment: It is noted that the application is to be served by a private water supply, this
matter is detailed in the main report of handling. It is noted that the provision of a
connection to the electricity network is not a matter that requires express planning
permission. The reference to LDP STRAT 1 and LDP 9 is unclear and it is assumed is
made with reference to the now superseded Argyll and Bute Local Development Plan
2015. It is noted that there is no obvious conflict in respect of the intentions of LDP STRAT
1 which promotes the concept of sustainable development which is now looked at more
extensively under the provisions of LDP2; it is also noted that the provisions of LDP 9
Page 63

Page 64

related to development setting, layout and design – again matters which are all reflected
in detail within the updated context of LDP2 and against which officers have set out their
assessment of the proposal and a recommendation that the current application is in
accordance with these requirements. It is noted that officers have undertaken a site visit
in their own assessment of the proposal and will include site photographs in their
presentation to PPSL; it would be up to members to determine if a further site appraisal
would add value to their own consideration of this matter. 
A further late issue has been conveyed as a verbal representation (further to her original
written representation) from Kirsty Leitch to the Planning Authority, advising that the
replacement agricultural building, as detailed within application reference
24/00259/PNAGRI, would not be suitable for the agricultural activities associated with the
farm. 
Comment: The comments regarding the replacement agricultural building are noted. It is
proposed to amend Condition 15 – Phasing of Development, relative to the application to
allow for increased flexibility for an alternative scheme for the provision of the replacement
barn. 
A late representation has been received, by email only, from Helen Mackay, dated
21.05.2024. The representation is summarised as: 
The replacement agricultural building is unsuitable, in practical terms, for the required
agricultural purposes. The field forming part of the application site for the new house is
part of the farm’s in-bye land and is classified as improved grassland. The field is used for
holding hoggs on their return from away-wintering and at this time all other in-bye land is
used to capacity. If allocating another field for these purposes, flock size would have to be
reduced, losing support payments and productivity. This would be contrary to LDP2 Policy
83 where this would result in this loss of agricultural land where it weakens the viability of
the agricultural unit. Housing hoggs elsewhere would be costly and an additional building
would have visual impacts. 
Comment: The development proposed by the current application seeks to develop an
existing barn and a rough area of adjacent ground. In terms of the land capability for
agriculture, the application site falls within Class 5.2 where the land is capable of use as
improved grassland, where pasture establishment may be difficult to maintain. NPF 4
Policy 5, sets out ‘Prime Agricultural Land’ as being Class 1, 2 or 3.1 in the land capability
classification for agriculture. The proposed development would be of a location that it
would not impact upon prime agricultural land, and its limited scale is such that it would
not impact significantly upon land of lesser quality that is culturally or locally important for
primary use, with due consideration to the extent of the wider agricultural landholding. 
The full list of conditions, to include the amendment to Condition 15, is appended to this
report. 
____________________________________________________________________________ 
(C) RECOMMENDATION   
That Members note the content of this report which does not introduce any new
information that has not already been addressed in the original Report of Handling. 
The recommendation of the Planning Authority remains that planning permission be
granted subject to the conditions and reasons appended to Supplementary Report No. 1. 
______________________________________________________________________ 
Author of Report: Emma Shaw   Date: 21.05.2024 
Page 64

Page 65

Reviewing Officer: Peter Bain                   Date: 21.05.2024  
Fergus Murray 
Head of Development and Economic Growth 
Page 65

Page 66

APPENDIX A – CONDITIONS AND REASONS RELATIVE TO APPLICATION NO.
23/00185/PP, TO INCLUDE AN AMENDMENT TO CONDITION 15, PHASING OF
DEVELOPMENT. 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00185/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 01.02.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Drawings
1 (downtakings in
red)
PL_003  02.02.2023
Existing Drawings
2 (downtakings in
red)
PL_004  02.02.2023
Proposed
Elevations
PL_008  02.02.2023
Proposed Plan PL_006  02.02.2023
Proposed Section
A-A South
Elevation and
Section B-B
PL_007  02.02.2023
Proposed Renders PL_009  02.02.2023
Proposed Interior
Renders 
PL_010  02.02.2023
Existing Site Plan PL_002  27.02.2023
Proposed Site Plan PL_005  27.02.2023
Proposed Plan PL_006  27.02.2023
Location Plan PL_001  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
3. Sustainable Drainage System 
Page 66

Page 67

Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small
Scale Development – www.sepa.org.uk .  
4. Landscaping and Biodiversity Enhancement 
No development shall commence until a scheme of biodiversity protection and
enhancement, boundary treatment, surface treatment and landscaping has been
submitted to and approved by the Planning Authority. The scheme shall include details
of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding
areas; 
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels; 
iv) Proposed hard and soft landscape works; and 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Page 67

Page 68

Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
5. Junction with Public Road 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD08/004a and shall
include visibility splays of 2.4 metres to point X by 75 metres to point Y from the centre
line of the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the formation/alteration
of a junction with the public road. 
• The access shall be constructed and drained to ensure that no surface water
is discharged onto the public road.  
6. Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety.  
7.  Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Page 68

Page 69

Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
• Regulatory requirements for private water supplies should be discussed with
the Council’s Environmental Health Officers in the first instance.  
8. Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
roof coverings and external walls have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the Planning
Authority. 
Reason: In order to integrate the development into its surroundings.  
9. PP - Removal of PD Rights – Dwellinghouse 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1D, 2B, 3A,
3B, 3C, 3D and 3E of the aforementioned Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse. 
Page 69

Page 70

Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission. 
Reason: To maintain the integrity and architectural value of this bespoke
dwellinghouse and to protect it and its immediate setting against inharmonious
additions and accretions and to protect the sensitive area and the setting of the
proposed dwellinghouse in the interest of visual amenity and public health, from
unsympathetic siting and design of developments normally carried out without
planning permission; these normally being permitted under Article 2(4) of the Town
and Country Planning (General Permitted Development) (Scotland) Order 1992 (as
amended).  
11. Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of nesting birds has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority. In circumstances where species of interest are identified as being
present, or at risk from construction works, the survey shall further provide suggested
avoidance and or mitigation measures, including timing constraints, to address such
presence or risk. The development shall be implemented in accordance with the
measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation.  
12.  Implement/Operate Development in Accordance with Identified Mitigation
Measures 
Notwithstanding the provisions of Condition 1, the development shall be undertaken
in accordance with the mitigation measures set out in the documents titled ‘Preliminary
Ecological Appraisal’ dated August 2022 and ‘Otter & Bat Surveys Report’ dated
September 2022.   
Reason: In order to protect natural heritage assets in the interest of nature
conservation.  
13. Contaminated Land 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on site, a scheme will be submitted by the Developer
(at their expense) to identify and assess potential contamination on site.  No
construction work shall commence until the scheme has been submitted to, and
Page 70

Page 71

approved, by the Planning Authority, and is thereafter implemented in accordance with
the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including PAN 33 (2000) and BS10175:2011 or,
in the event of these being superseded or supplemented, the most up-to-date
version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope
and method of recommended further investigations shall be agreed with the
Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken
in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents. 
c) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works, and proposed
verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
14.  Tree Retention and Protection 
No development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location and canopy spread of
trees to be retained as part of the development; 
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread of each tree in accordance with BS 5837:2005 “Trees in Relation to
Construction”. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
Page 71

Page 72

or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation.  
15.  Phasing of Development 
No development shall commence until such time as the associated replacement
agricultural building (either as granted under prior notification ref. 24/00259/PNAGRI;
or subsequently renewed/amended, or an alternative scheme for the provision of a
replacement building that has been acknowledged as such in writing by the planning
authority) has been erected and made available for agricultural use in the management
of Lagganulva Farm. 
Reason: In order to ensure that the development of the existing barn the subject of
this current planning permission is delivered in accordance with the stated
management and development of the remainder of the agricultural holding. 
Page 72

Page 73

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/00185/PP
Planning Hierarchy: Local Development 
Applicant: Torloisk Estate
Proposal: Conversion and extension of stone barn to form dwellinghouse,
installation of septic tank and formation of vehicular access
Site Address:  Land West of Lagganulva Farm    
DECISION ROUTE 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Conversion and extension of barn to form dwellinghouse
• Installation of private drainage system 
• Formation of vehicular access
• Connection to private water supply 
(ii) Other specified operations
• None 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be granted subject to the conditions and
reasons appended to this report. 
(C) CONSULTATIONS:   
Argyll and Bute Council – Roads Authority
Report dated 14.03.2023 advising of no objections to the application subject to
conditions relating to the formation of the access at the junction with the public road,
the clearance and maintenance of visibility splays, the provision of a system of
surface water drainage, and the provision of a parking and turning area. The report
further advises that the required sightlines are achievable within the public road
corridor. 
Scottish Water
Letter dated 14.03.2023 advising of no objections to the application.
Page 73

Page 74

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
NatureScot
Letter dated 04.04.2023 advising that the proposed development lies within the
Lagganulva Woodland Site of Special Scientific Interest and within the Loch na Keal
National Scenic Area. The letter advises that the proposed development is unlikely
to have a significant effect on the qualifying interests of these sites either directly or
indirectly. The letter further advises that European Protected Species, such as bats
and otters, may be present on the site. 
Argyll and Bute Council – Environmental Health Service
Report dated 27.03.2023 advising that the application appears to be proposing the
redevelopment of land where there is an indication of previous use which may be
contaminative. The response recommends the inclusion of a planning condition
relating to a site investigation and risk assessment. 
Local Biodiversity Officer
Email dated 19.04.2023 advising of agreement with the submitted Preliminary
Ecological Appraisal and requesting further surveys to identify the presence of otters,
bats and nesting birds, and requesting the provision of a Tree Protection and
Management Plan. Upon the submission of an Otter and Bat Survey Report, the
Local Biodiversity Officer was re-consulted and, in an email dated 26.06.2023,
advised that works should be carried out in accordance with the submitted Report. 
The above represents a summary of the issues raised.  Full details of the consultation
responses are available to view via the Public Access section of the Council’s
website. 
(D) HISTORY:   
24/00259/PNAGRI
Erection of agricultural shed
Prior Approval Not Required and permission therefore granted – Decision Issued
10.04.2024 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 18.04.2023. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
22 objections have been received to the application. 
OBJECTIONS 
Mr Daniel Brooks, Sapling Cottage, Ulva Ferry, Isle of Mull, PA73 6LY (14.04.2023)
Mr Rhuri Munro, Ferry House, Ulva, Isle of Mull, PA73 6LZ (17.04.2023)
Christine Leach (15.04.2023 and 17.04.2023) 
Celia Royce, Kellan Old Farm, Aros, Isle of Mull, PA72 6JY – by email only
(17.04.2023) 
Page 74

Page 75

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Kirsty Leitch – by email only (17.04.2023) 
Miss Hilary Sutton, The Bothy, Tigh-Na-Caora, B8073 North of Ulva Ferry, from
Grouse Cottage to C44 Ulva Ferry Road, Ulva Ferry, Isle of Mull, PA73 6LT
(18.04.2023)
Ms Irene Anderson, Burnedge, Bridge of Eam, Perth, PH2 9BP (18.04.2023)
Ms Elizabeth Wood, 9 Lochmill Holding, Milton of Campsie, Glasgow, G66 8AG
(18.04.2023)
Mr Michael Hogan, 29 Coltpark Woods, Hamsterley Colliery, Newcastle Upon Tyne,
NE17 7SP (18.04.2023) 
Mr Kieran Murray, Craighead Cottage, Braco, Dunblane, FK15 9LP (18.04.2023)
E Wood – by email only (17.04.2023) 
Nick Mawhinney (14.04.2023) 
Sarah Mawhinney – by email only (17.04.2023) 
Dr Robert Stewart, Killiemore Garden Caravan, Killiechronan, Isle of Mull, PA72 6JZ
(18.04.2023) 
Ms Helen Stace, Scoor Cottage, Ulva Ferry, Isle of Mull, PA73 6LX (four
representations dated 18.04.2023)
Tim Dixon, Scoor Cottage, Croft 3, Fanmore (18.04.2023)
North West Mull Community Woodland Company Ltd, Penmore Mill, Dervaig, Isle of
Mull, PA75 6QS (17.04.2023)
Lauren Worrell, NFU Scotland, Rural Centre – West Mains, Ingliston, Newbridge,
Midlothian, EH28 8LT (18.03.2024) 
Representations are published in full on the planning application file and are available
to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
OBJECTION 
Conversion of existing barn 
• The existing barn is of historic and visual interest. 
• The tenant farmers still use the barn and have done so for a long time. The
existing building remains in use for agricultural purposes. The building is not
redundant and is part of a local enterprise. A replacement building would be
required and is unlikely to be of a similarly traditional appearance. 
• If the existing barn building were to be removed from its current use, a
replacement building would be required. The replacement building would not
be in keeping with the setting. 
• Steading buildings that are maintained and in use on Mull are rare. 
Officer Comment: The barn the subject of this planning application is not listed or
protected in any way. Neither is it located within a conservation area. It could,
therefore, be demolished at any time without reference to the planning authority. The
agent has advised that the existing barn, on the opposite side of the public road to
the established farm steading, is unsuitable in terms of its siting, scale and form, and
is not suitable for current agricultural use or machinery storage and does not provide
an efficient space for such uses. The barn as existing is unable to accommodate
agricultural machinery, meaning that machinery is kept outside. The ceasing of the
agricultural use of the existing barn does not form a material planning consideration,
Page 75

Page 76

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
however, the applicant submitted a prior notification application to erect a building
as 'agricultural permitted development' on land to the north of Lagganulva Farm (our
reference 24/00259/PNAGRI). The application was determined as permitted
development in terms of Class 18 of the Town and Country Planning (General
Permitted Development) (Scotland) Order 1992 as amended. The report
accompanying application 24/00259/PNAGRI considered that the erection of an
agricultural building within the holding would have no materially negative visual
impact on the environment or the wider landscape including the National Scenic
Area. The replacement agricultural building is to be sensitively sited within the
existing farm complex where it would be largely screened from the public realm by
existing built development. The replacement agricultural building would instead
relate both visually and functionally to existing buildings associated with the
agricultural business and the scale of the replacement agricultural building would be
commensurate with the functional need for the building and its setting in the
landscape. 
Provision has therefore been made for an alternative building for use by the tenant
farmer on land within the farm steading and closer to the existing buildings than the
barn the subject of this application. The provision of the alternative agricultural
building can be secured through the use of a suitable planning condition which would
require it to be available for use by the tenant farmer before any works on the
conversion of the existing barn commence. 
The existing barn would be retained as part of the development proposal. It is
proposed to repair and repoint the existing stone walls of the barn and make use of
the existing tiled roof. The alterations to the existing barn would be limited to repairs
to the walls and roof, the installation of windows and doors, and downtakings to
facilitate the adjoining of the proposed extension. In this way, the proposed
development would largely preserve the existing building, thereby retaining its
character and appearance. 
Biodiversity 
• The existing barn and the wider application site hosts bats, birds and otters. 
• Otters, bats and barn owls are present on and around the application site. 
• The submitted information does not  demonstrate how the development
would benefit biodiversity. 
Officer Comment: The application has been submitted with a Preliminary
Ecological Appraisal and an Otter and Bat Survey Report. The Council’s Biodiversity
Officer was consulted on the application and confirmed agreement with the
submitted information, stating that a pre-commencement survey is required to
identify bird nests within the application site. The Council’s Biodiversity Officer
confirmed agreement with the proposed mitigation measures in relation to the impact
of the proposed development upon otters, bats and nesting birds. Suitable conditions
are required to ensure that the proposed development is carried out in accordance
with the mitigation measures outlined within the submitted Preliminary Ecological
Appraisal and the Otter and Bat Survey Report, and to secure the provision of a pre-
commencement nesting bird survey to ensure that no bird species are compromised. 
NPF4 Policy 3(c) requires development proposals to include appropriate measures
to conserve, restore and enhance biodiversity. The information submitted with the
Page 76

Page 77

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
application has demonstrated that the development proposal would conserve
biodiversity. With regard to biodiversity enhancement, adequate and proportionate
measures for biodiversity enhancement and protection can be delivered by planning
condition, to be secured prior to the commencement of development. The condition
will secure the provision of biodiversity enhancement measures prior to the
occupation of the development. 
Landscape and visual impact 
• The installation of windows into the existing barn would have a detrimental
impact upon the character and appearance of the National Scenic Area,
increasing the prominence of the building. The existing development at
Lagganulva is a focal point and the existing house and steadings are
important local landmarks. The proposed extension would be harmful to the
location which is highly valuable in terms of scenic beauty. 
• The development would be sited within the Loch na Keal National Scenic
Area. The Landscape Capacity Study specifically identifies the existing
Lagganulva setting for special consideration. 
• The nearest electricity supply is on the opposite side of the road. No
information has been provided as to whether the connecting cable would run
underground or result in additional unsightly poles and lines. 
• No information has been provided regarding landscaping and boundary
treatments. 
Officer Comment: The proposed windows are considered to be suitable to the scale
of the existing barn and would have a negligible impact upon the appearance of the
existing building. The application proposes to retain the scale and form of the
existing barn, to include the repair of the existing stone walls and slate roof, and in
this regard the development would retain the character and appearance of the
existing barn without any material harm to the character and appearance of the
National Scenic Area. 
The proposed extension would be modest in scale, occupying a total external
footprint of 56 square metres. The proposed extension would have a simple and
traditional narrow, linear form and a single storey dual-pitched roof, ensuring that it
would not appear as unduly prominent. The proposed timber finishing materials
would assist in providing the proposed extension with a simple appearance, ensuring
that it would integrate with the appearance of the rural surroundings. The extension
would be sited sensitively on land between the existing barn and the public road,
ensuring that it would not encroach into more open and undeveloped areas of the
site. 
The application proposes to retain the existing development at the site through the
repair and conversion of the existing stone barn. In this regard, the site would remain
a focal point within the landscape. Given the small scale and appropriate form,
design and appearance of the proposed extension, the visual composition of the site
would not be adversely impacted and the proposal would not therefore disrupt the
visual focus. 
Page 77

Page 78

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
A scheme for boundary treatment, surface treatment and landscaping is to be
secured via planning condition, to include the submission of details any proposed
walls, fences and gates; surface treatment; and hard and soft landscaping works. 
Proposed use 
• The area does not need short term holiday letting properties; the area instead
requires long term affordable accommodation. 
• Granting planning permission for a development of this nature would set a
precedent for the use of agricultural buildings as short-term holiday letting
accommodation where agricultural buildings are already in scarce supply.   
Officer Comment: The proposal the subject of this planning application is seeking
to secure planning permission for the conversion of and extension to the existing
stone barn to form a dwellinghouse. This is by no means an unusual type of
development. The Planning Authority is satisfied that the existing barn, and the
application site, is able to successfully accommodate a suitably sited, scaled and
designed extension which would facilitate the conversion of the existing stone barn
to form a dwellinghouse which would relate to the established appearance of the
surrounding area. The application relates to the provision of a dwellinghouse and
does not relate to short term let accommodation. Whilst it is acknowledged that the
future occupancy or tenure of the dwellinghouse is unknown, the Council currently
has no planning policies that could control this and, in that regard, this is not
considered a planning issue of any overriding material significance. 
Water supply and drainage 
• The application indicates a connection to the public water supply, however
no such supply is available and no details have been submitted regarding
the private water supply. 
• All existing water supplies are barely adequate and demand from another
development could not be sustained. 
• The proposed arrangement for sewage disposal is not satisfactory; the
discharge would be to Laggan Bay which is within a designated Shellfish
Waters Protected Area and that must be safeguarded.   
• The application has not been submitted with a technical report for foul water
drainage. This is relevant as the building is adjacent to a watercourse and
the proposed soakaway would be adjacent to a well and on an area of ground
which is waterlogged all year round. 
Officer Comment: The agent has confirmed that the proposed development would
be served by a private water supply. A suitable pre-commencement condition is
required to secure an appraisal of the wholesomeness and sufficiency of the
intended private water supply and the system required to serve the development to
ensure that an adequate private water supply in terms of both wholesomeness and
sufficiency can be provided to meet the requirements of the proposed development
and without compromising the interests of other users of the same or nearby private
water supplies. 
Page 78

Page 79

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The application proposes the installation of a private drainage system and a
soakaway. The Council’s Building Standards Service will apply sufficient control over
the treatment plant arrangements at Building Warrant stage. The proposed drainage
system would be regulated under the building standards to ensure that it is capable
of being provided to a safe, effective and appropriate technical standard. Any
discharge to the water environment would be regulated by SEPA under the Water
Environment (Controlled Activities) (Scotland) Regulations 2011 (as amended). It is
the responsibility of the installer and owner to ensure that the drainage system is
installed and maintained correctly. Pollution enforcement is the responsibility of
SEPA and as the proposed development is not located within a Waste Water
Drainage Consultation Area there is no reason to assume that a safe and effective
private wastewater system cannot be utilised. 
Additionally, the area of the marine environment within the vicinity of the proposed
development site is not within either a Marine Protected Area or a Marine
Consultation Area. 
Trees 
• No works should occur within the root protection area or tree protection zone.
The site features veteran trees and the application describes felling, limbing,
crown reduction and pollarding, which would significantly impact upon the
appearance of the area. 
• The submitted tree report fails to recognise the age and significance of the
trees and fails to take into account elder trees on the roadside boundary. 
• The clearance of visibility splays for the access may result in the loss of
roadside trees and walls. 
• The trees provide a food source for insects. 
Officer Comment: The proposed extension to the existing barn would be sited
towards the southeast corner of the application site, away from the mature trees
which are sited adjacent to the northwest of the existing barn. The submitted
information advises that any excavation works in the area adjacent to the tree
protection zone would be excavated by hand. The application does not propose any
works to the trees on site. However, given the presence of established mature trees
at the site, a suitable condition is required to secure the provision of a scheme for
the retention and safeguarding of trees during construction work, to include detail of
any proposed tree works and a programme of measures for the protection of trees
during construction works. 
The proposed development would not harm the Lagganulva Wood Site of Special
Scientific Interest. 
Suitability of the site 
• The application has been submitted with insufficient information with regard
to biodiversity, landscape impact, sustainability, water supply, the proposed
use of the site, and the impact upon the Site of Special Scientific Interest
designation. 
Page 79

Page 80

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• The steading proposed for conversion is part of a working farmyard with
characteristic noises created by animals and machinery. This may create
conflict between neighbours. 
• The Torloisk Estate already has properties which have been moved into the
self-catering market. 
• A house in this location is invasive of privacy. The location and design of the
proposed development would negatively impact upon the residents of
Lagganulva Farm and the surrounding landscape. 
• The barn is not a suitable site for the development proposed. 
• Protection is required for agricultural land which is good quality and locally
important. The field associated with the steading is valuable in this location. 
Officer Comment: The information submitted with the application, in the form of the
Preliminary Ecological Appraisal, photomontages, Tree Report, Otter and Bat
Report, Design Statement, and ‘Six Qualities of Successful Places’ Statement have
satisfactorily demonstrated that, in this instance, the proposed development site
would represent an appropriate opportunity for development with a sensitively sited
extension which would be of an acceptable scale, design and finish that would
integrate with the application site and its wider setting within the landscape. 
The application site is located southwest of the existing farm. Whilst the application
site and the proposed development would be located in proximity to the agricultural
business, the proposed development would be sited at a sufficient distance to
ensure that there would be no impact upon neighbour amenity with regard to
overlooking, visual intrusion or shading. In terms of ‘bad neighbour’ development,
the application site would be physically separate from the established farm, which is
sited on the opposite side of the public road. The proposed development would be
well contained within the application site and would not share access with the farm,
nor would the application site be functionally associated with the agricultural
business. The proposed development would be sufficiently distinct from the farm
and its associated activity such that it is not considered that there would be any
adverse impacts upon the sensitive receptor of the dwellinghouse with regard to
noise disturbance, odour pollution or light pollution. 
The development proposed by the current application seeks to develop a rough area
of ground adjacent to the existing barn. In terms of the land capability for agriculture,
the application site falls within Class 5.2 where the land is capable of use as
improved grassland, where pasture establishment may be difficult to maintain. The
proposed development would be of a small scale and would not impact upon prime
agricultural land, or land of lesser quality that is culturally or locally important for
primary use, with due consideration to the extent of the wider agricultural
landholding. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No  
Page 80

Page 81

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No  
(iii) A Design or Design/Access statement:    ☒Yes ☐No 
A Design Statement has
been submitted with the
application.  
(iv) A Sustainability Checklist 
(with reference to the requirements of LDP2
Policy 04) 
☐Yes ☒No 
The application was
submitted prior to the
adoption of the LDP2
and has been submitted
with a Preliminary
Ecological Appraisal,
photomontages, a Tree
Report, an Otter and Bat
Report, a detailed
Design Statement, and
a ‘Six Qualities of
Successful Places’
Statement, which
together with the site
visits undertaken, has
demonstrated that there
would be no significant
adverse effect on
landscape and visual
amenity resulting from
the development of the
site with the conversion
of, and extension to, the
existing barn and
therefore, in this
instance, it is not
considered that any
further landscape/visual
information is required
to allow a decision on
the proposal to be
made. 
(v) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No
Page 81

Page 82

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 17 – Rural Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 11 – Design – Conversions and Change of Use
Policy 14 – Bad Neighbour Development 
Connected Places
Page 82

Page 83

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road 
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 58 – Private Water Supplies and Water Conservation
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People 
Policy 67 – Provision of Housing to Meet Local Needs Including Affordable Housing 
High Quality Environment 
Policy 70 – Development Impact on National Scenic Areas (NSA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 75 – Development Impact of Sites on Sites of Special Scientific Interest
(SSSIs)
Policy 77 – Forestry, Woodland and Trees
Policy 79 – Protection of Soil and Peat Resources
Policy 82 – Contaminated Land
Policy 83 – Safeguarding Agricultural and Croft Land 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC draft Technical Note – Argyll and Bute Windows (April 2018) 
• ABC Landscape Studies
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
Page 83

Page 84

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
Whilst there has been considerable objection raised, it is noted that only approximately half
of those objections are from the local area. In addition, the representations relate largely to
the conversion of the existing barn to form a dwellinghouse and the resultant loss of its
existing use for agricultural purposes. The loss of the agricultural use of the existing barn is
not, in itself, a material planning consideration as it is a privately owned building that is not
afforded any protection status. Whilst officers have every sympathy with the tenant farmer,
the applicant has, at the insistence of the planning authority, addressed this concern through
the provision of a replacement agricultural building, as detailed within application reference
24/00259/PNAGRI. With regard to objections raised in terms of biodiversity, landscape,
servicing, infrastructure and access, the Officer’s recommendation is aligned with the
consultation responses received on the application and as such it is not considered that a
pre-determination hearing would add value to the decision making process. 
(O)(i) Key Constraints/Designations Affected by the Development:
• Loch na Keal National Scenic Area
• Lagganulva Wood Site of Special Scientific Interest 
(O)(ii) Soils
Agricultural Land Classification:  Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒Class 5
☐N/A
Peat Depth Classification: 1 metre 
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A 
The application site falls within Class 5.2
where the land is capable of use as
improved grassland, where pasture
establishment may be difficult to maintain.
The proposed development would be of a
small scale such that it is considered that
the proposed development would not
impact upon prime agricultural land, or land
of lesser quality that is culturally or locally
important for primary use, with due
consideration to the extent of the wider
agricultural landholding. 
(O)(iii) Woodland  
Page 84

Page 85

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Will the proposal result in loss of
trees/woodland? 
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  ☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP2 Settlement Strategy 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
The proposal the subject of this planning application is seeking to secure planning
permission for the conversion of, and extension to, an existing barn to form a
dwellinghouse, and the installation of a septic tank and the formation of a vehicular
access. 
In terms of the adopted LDP2 the site is defined as ‘Outwith Settlement Areas’ within
an area identified as ‘Countryside Area' where Policy 02 of LDP2 gives a presumption
in favour of sustainable development where it is of an appropriate scale, design,
siting and use for its countryside location, as set out in the relevant sustainable siting
and design policies of LDP2. 
Policy 02 further states that certain development will be supported, generally without
the need for detailed environmental assessments, with these comprising, infill,
redevelopment opportunities of clusters; or previously developed sites. In
Countryside Areas, where there are nature conservation or landscape designations
in place, Policy 02 details that development proposals will have to demonstrate that
they are compatible with the designation interests. 
The application site comprises an irregular plot of land located on the northern edge
of Laggan Bay, immediately to the west of the B8073 public road. To the northeast
of the application site, to the east of the public road, there is a farmhouse and
associated outbuildings. The application site features an existing ‘L’ shaped stone
barn with a hipped slate roof, set within the southeast corner of the plot. There are a
number of mature trees within the site boundary. 
This application is seeking to secure planning permission for the conversion of, and
extension to, the existing stone barn at the site to form a dwellinghouse, and the
installation of a septic tank and the formation of a vehicular access. The existing
stone walls of the barn would be repaired and repointed as necessary, and the slate
roof would be retained. The proposed extension to the barn would be sited upon the
Page 85

Page 86

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
eastern elevation and would take a linear form, orientated parallel to the public road,
with a dual-pitched roof and gable ends. 
The application proposes the upgrade of an existing vehicular access to serve the
proposed development, with the formation of a turning area and parking provision for
two vehicles. The water supply would be via connection to a private supply and the
foul drainage would be by way of a private system comprising a septic tank and
soakaway due to the lack of public infrastructure within the vicinity of the application
site. 
The proposal has elicited 22 objections.   
The main considerations relate to whether or not the conversion of, and extension
to, the existing stone barn at the application site to form a dwellinghouse is
appropriate in terms of scale, design, siting and use for its countryside location;
whether the servicing, infrastructure and access arrangements are suitable; whether
the proposal is acceptable in terms of biodiversity and landscape impacts; and
whether it is consistent with the provisions of adopted National and Local Planning
Policy.   
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan and National Planning Framework 4 and there are no other
material considerations of sufficient significance, including issues raised by third
parties, to indicate that it would be appropriate to withhold planning permission
having regard to Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Emma Shaw Date: 08.05.2024 
Reviewing Officer: Tim Williams Date: 08.05.2024 
Fergus Murray
Head of Development & Economic Growth 
Page 86

Page 87

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00185/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 01.02.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Drawings
1 (downtakings in
red)
PL_003  02.02.2023
Existing Drawings
2 (downtakings in
red)
PL_004  02.02.2023
Proposed
Elevations
PL_008  02.02.2023
Proposed Plan PL_006  02.02.2023
Proposed Section
A-A South
Elevation and
Section B-B
PL_007  02.02.2023
Proposed Renders PL_009  02.02.2023
Proposed Interior
Renders 
PL_010  02.02.2023
Existing Site Plan PL_002  27.02.2023
Proposed Site Plan PL_005  27.02.2023
Proposed Plan PL_006  27.02.2023
Location Plan PL_001  27.02.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
3. Sustainable Drainage System 
Page 87

Page 88

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Notwithstanding the effect of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition. The requisite surface water
drainage shall be operational prior to the development being brought into use and shall
be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small
Scale Development – www.sepa.org.uk .  
4. Landscaping and Biodiversity Enhancement 
No development shall commence until a scheme of biodiversity protection and
enhancement, boundary treatment, surface treatment and landscaping has been
submitted to and approved by the Planning Authority. The scheme shall include details
of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding
areas; 
iii) Any proposed re-contouring of the site by means of existing and
proposed ground levels; 
iv) Proposed hard and soft landscape works; and 
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity, and how
these benefits will be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the physical biodiversity
enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife ponds, bat and
insect boxes, hedgehog homes etc), the boundary treatment, surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Page 88

Page 89

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity.  
5. Junction with Public Road 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD08/004a and shall
include visibility splays of 2.4 metres to point X by 75 metres to point Y from the centre
line of the proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall disrupt
visibility from a point 1.05 metres above the access at point X to a point 0.6 metres
above the public road carriageway at point Y. The final wearing surface on the access
shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
Note to Applicant: 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be
obtained from the Council’s Roads Engineers prior to the formation/alteration
of a junction with the public road. 
• The access shall be constructed and drained to ensure that no surface water
is discharged onto the public road.  
6. Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. 
Reason: In the interest of road safety.  
7.  Private Water Supply 
No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved in writing by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist and shall include a risk
assessment having regard to the requirements of Schedule 4 of the Private Water
Supplies (Scotland) Regulations 2006 which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Page 89

Page 90

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
Note to Applicant: 
• Regulatory requirements for private water supplies should be discussed with
the Council’s Environmental Health Officers in the first instance.  
8. Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until
written details of the type and colour of materials to be used in the construction of the
roof coverings and external walls have been submitted to and approved in writing by
the Planning Authority. The development shall thereafter be completed using the
approved materials or such alternatives as may be agreed in writing with the Planning
Authority. 
Reason: In order to integrate the development into its surroundings.  
9. PP - Removal of PD Rights – Dwellinghouse 
Notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re-
enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the
Schedule to that Order, shall operate so as to permit, within the area subject of this
permission, any development referred to in Part 1 and Classes 1A, 1B, 1D, 2B, 3A,
3B, 3C, 3D and 3E of the aforementioned Schedule, as summarised below: 
PART 1: DEVELOPMENT WITHIN THE CURTILAGE OF A DWELLINGHOUSE 
Class 1A: Any enlargement of a dwellinghouse by way of a single storey ground floor
extension, including any alteration to the roof required for the purpose of the
enlargement. 
Class 1B: Any enlargement of a dwellinghouse by way of a ground floor extension
consisting of more than one storey, including any alteration to the roof required for the
purpose of the enlargement. 
Class 1D: Any enlargement of a dwellinghouse by way of an addition or alteration to
its roof. 
Class 2B: Any improvement, addition or other alteration to the external appearance of
a dwellinghouse that is not an enlargement. 
Class 3A: The provision within the curtilage of a dwellinghouse of a building for any
purpose incidental to the enjoyment of that dwellinghouse or the alteration,
maintenance or improvement of such a building. 
Class 3B: The carrying out of any building, engineering, installation or other operation
within the curtilage of a dwellinghouse for any purpose incidental to the enjoyment of
the dwellinghouse. 
Page 90

Page 91

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Class 3C: The provision within the curtilage of a dwellinghouse of a hard surface for
any purpose incidental to the enjoyment of that dwellinghouse or the replacement in
whole or in part of such a surface. 
Class 3D: The erection, construction, maintenance, improvement or alteration of any
deck or other raised platform within the curtilage of a dwellinghouse for any purpose
incidental to the enjoyment of that dwellinghouse. 
Class 3E: The erection, construction, maintenance, improvement or alteration of any
gate, fence, wall or other means of enclosure any part of which would be within or
would bound the curtilage of a dwellinghouse. 
No such development shall be carried out at any time within this Part and these
Classes without the express grant of planning permission. 
Reason: To maintain the integrity and architectural value of this bespoke
dwellinghouse and to protect it and its immediate setting against inharmonious
additions and accretions and to protect the sensitive area and the setting of the
proposed dwellinghouse in the interest of visual amenity and public health, from
unsympathetic siting and design of developments normally carried out without
planning permission; these normally being permitted under Article 2(4) of the Town
and Country Planning (General Permitted Development) (Scotland) Order 1992 (as
amended).
10. Electric Vehicle Charging 
Notwithstanding Condition 1, Prior to the commencement of development, details of
the provision of supply cabling suitable for electric vehicle charge points shall first be
submitted and approved in writing by the Local Planning Authority. Thereafter the
electric vehicle charge points must be available for use in the development hereby
approved. 
Reason: In order to ensure compliance with LDP2 Policy 34.   
11. Pre-commencement Survey 
No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of nesting birds has been carried out by an
appropriately qualified person and has been submitted for the written approval of the
Planning Authority. In circumstances where species of interest are identified as being
present, or at risk from construction works, the survey shall further provide suggested
avoidance and or mitigation measures, including timing constraints, to address such
presence or risk. The development shall be implemented in accordance with the
measures identified in the duly approved scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation.  
12.  Implement/Operate Development in Accordance with Identified Mitigation
Measures 
Notwithstanding the provisions of Condition 1, the development shall be undertaken
in accordance with the mitigation measures set out in the documents titled ‘Preliminary
Page 91

Page 92

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Ecological Appraisal’ dated August 2022 and ‘Otter & Bat Surveys Report’ dated
September 2022.   
Reason: In order to protect natural heritage assets in the interest of nature
conservation.  
13. Contaminated Land 
Unless otherwise agreed in writing and in advance by the Planning Authority, prior to
any development commencing on site, a scheme will be submitted by the Developer
(at their expense) to identify and assess potential contamination on site.  No
construction work shall commence until the scheme has been submitted to, and
approved, by the Planning Authority, and is thereafter implemented in accordance with
the scheme so approved.   
The scheme shall be undertaken by a competent person or persons in accordance
with relevant authoritative guidance including PAN 33 (2000) and BS10175:2011 or,
in the event of these being superseded or supplemented, the most up-to-date
version(s) of any subsequent revision(s) of, and/or supplement(s) to, these
documents. This scheme should contain details of proposals to investigate and
remediate potential contamination to the satisfaction of the Planning Authority, and
must include:- 
a) A desk study and development of a conceptual site model including (where
necessary) a detailed site investigation strategy. The desk study and the scope
and method of recommended further investigations shall be agreed with the
Council prior to addressing parts b, c, and d of this condition. 
Should the desk study show the need for further assessment this will be undertaken
in the following sequence: 
b) A detailed investigation of the nature and extent of contamination on site, and
assessment of the risks such contamination presents. 
c) Development and agreement of a remedial strategy (if required) to treat/
remove contamination ensuring the site is made suitable for its proposed use
(this shall include a method statement, programme of works, and proposed
verification plan). 
d) Submission of a verification report for any agreed remedial actions detailing
and evidencing the completion of these works. 
Written confirmation from the Planning Authority, that the scheme has been
implemented and completed shall be required by the Developer before any
development hereby approved commences. Where remedial measures are required
as part of the development construction detail, commencement must be agreed in
writing with the Planning Authority. 
Reason: To ensure that the potential risks to human health, the water environment,
property, and, ecological systems arising from any identified land contamination have
been adequately addressed. 
14.  Tree Retention and Protection 
Page 92

Page 93

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
No development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location and canopy spread of
trees to be retained as part of the development; 
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread of each tree in accordance with BS 5837:2005 “Trees in Relation to
Construction”. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation.  
15.  Phasing of Development 
Notwithstanding the provisions of Condition 1, prior to the commencement of any
development on site, the associated replacement agricultural building, as granted
under application 24/00259/PNAGRI, shall be erected and available for use. 
Reason: In order to ensure that the development of the existing barn the subject of
this current planning permission is delivered in accordance with the stated
management and development of the remainder of the agricultural holding. 
Page 93

Page 94

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/00185/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission for
the conversion of, and extension to, an existing stone barn to form a dwellinghouse, the
installation of a private drainage system and the formation of a vehicular access. 
2. Location of Proposed Development 
2.1. The application site comprises an irregular plot of land located on the northern edge of
Laggan Bay, immediately to the west of the B8073 public road. 
2.2. To the northeast of the application site, to the east of the public road, there is a farmhouse
and associated outbuildings. The application site features an existing ‘L’ shaped stone
barn with a hipped slate roof, set within the southeast corner of the plot. There are a
number of mature trees within the site boundary. 
3. Settlement Strategy 
3.1. In terms of the Settlement Strategy set out in the adopted LDP2, the application site is
situated ‘Outwith Settlements’ in the designated ‘Countryside Area’ where Policy 02 of
LDP2 gives a presumption in favour of sustainable development where it is of an
appropriate scale, design, siting and use for its countryside location, as set out in the
relevant sustainable siting and design policies of LDP2. Policy 02 further states that
certain development will be supported, generally without the need for detailed
environmental assessments, with these comprising, infill, redevelopment opportunities of
clusters; or previously developed sites. In Countryside Areas, where there are nature
conservation or landscape designations in place, Policy 02 details that development
proposals will have to demonstrate that they are compatible with the designation interests. 
In order to address the determining issues, the key considerations in this application are: 
3.1.1. Compliance with the Development Plan and other relevant planning policy.
3.1.2. Whether the conversion of, and extension to, the existing stone barn at the
application site to form a dwellinghouse is appropriate in terms of scale, design,
siting and use for its countryside location. 
3.1.3. The suitability of the proposed servicing, access and infrastructure
arrangements. 
3.1.4. Any other material considerations. 
4. Proposal 
4.1. The proposal is seeking to secure planning permission for the conversion of, and
extension to, the existing stone barn to form a dwellinghouse, and the installation of a
private drainage system and the formation of a vehicular access. 
4.2. The proposal relates to the refurbishment of and extension to an existing stone barn to
form a dwellinghouse. The existing barn, which has an ‘L’ shaped footprint covering an
area of approximately 89 square metres, is constructed of stone walls with a hipped slate
Page 94

Page 95

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
roof. The proposal would involve repairing and repointing the existing stone walls. The
proposed extension would adjoin the east elevation of the existing barn and would take a
narrow linear form with a small linking corridor, occupying a total footprint of 56 square
metres. The extension would have a dual-pitched roof set at a height of 4.7 metres with
an eaves height of 2.5 metres. The linking corridor set between the exiting barn and the
proposed extension, would have a flat roof at a height of 2.4 metres, set below the eaves
height of the existing barn. The proposed extension would feature large single windows
within the south, north and west elevations, and there would be two rooflights within the
east elevation roofslope. Windows would be inserted within each elevation of the existing
barn. An appropriate condition is required to secure the exact details of the proposed
facing and roofing materials so as to ensure that the proposed development integrates
into its surroundings. 
4.3. The existing vehicular access into the site, positioned to the north of the existing barn,
would be upgraded and a parking and turning area would be formed. The application
includes the installation of a private drainage system and connection to a private water
supply. 
5. Compliance with National Policy 
5.1. NPF4 Policy 1 – Tackling the Climate and Nature Crises 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it requires
to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for, or
against a proposal on the basis of its positive or negative contribution to climate and
nature crises. 
5.2. NPF4 Policy 2 – Climate, Mitigation and Adaption 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited
and designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis is on
minimising emissions as far as possible, rather than eliminating emissions. The Spatial
Settlement Strategy set out within LDP2 seeks to deliver sustainable levels of growth by
steering the majority of development to our existing settlements as these are where the
most of our current infrastructure, services, employment opportunities, housing and
community facilities are to be found, however LDP2 recognises that there are instances
where a different approach to significant development has to be taken particularly where
existing infrastructure or services are at capacity and where a more sustainable option
would be to provide new facilities elsewhere. 
5.3. NPF4 Policy 3 – Biodiversity 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver positive
effects from development and strengthen nature networks. 
The application has been submitted with a Preliminary Ecological Appraisal, which sought
to establish the potential for the application site to support protected species known to
inhabit the area, namely otters, nesting birds, bats, reptiles, and butterflies/day flying
Page 95

Page 96

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
moths and bats. The Preliminary Ecological Appraisal also sought to map the habitats
within the site boundary to identify the presence of any priority habitats or flora. The
existing barn was classed as having ‘Moderate’ bat roost potential and four trees within
the application site boundary were found to have the potential to support bats, classed as
‘Low’ potential. No notable or rare plant species or habitats were identified on the site. No
evidence was discovered to suggest the presence of otters within the application site. 
The Council’s Biodiversity Officer has been consulted on the application and confirmed
agreement that additional surveys were required with regard to the impact of the proposed
development upon otters and bats. The consultation response from the Council’s
Biodiversity Officer confirmed agreement that a pre-commencement survey is required to
identify bird nests within the application site and a Tree Protection and Management Plan
is provided so as to protect the existing trees within the application site during the
clearance and construction phases of the proposed development. 
An Otter and Bat Survey Report was subsequently submitted following the findings and
recommendations of the Preliminary Ecological Appraisal. The Report stated that an otter
survey undertaken concluded that is unlikely that there is an otter holt close enough to the
development site as to be at risk of disturbance and therefore no European Protected
Species Licence need be sought in respect of otters. However, at least one otter utilises
the burn adjacent to the site and therefore mitigation measures should be adhered to. The
two trees adjacent to the existing barn were subject to activity surveys however were not
found to contain bat roosts and therefore no further survey work would be required. The
Report states that the proposed development of the existing barn would result in the
destruction of two summer roosting non-maternity Soprano pipistrelle roosts impacting on
up to three Soprano pipistrelle bats and one summer roosting Brown Long-eared roost
impacting on up to five Brown Long-eared bats. A European Protected Species Licence
for bats would be required and mitigation measures adhered to. The Report further states
that due to the nature of the habitat present and the identification of several nests within
the site boundary and within the barn itself, should the development be planned to take
place during the breeding bird season, pre-construction checks for nests would be
required. Following the submission of the Otter and Bat Survey Report, the Council’s
Biodiversity Officer was re-consulted and confirmed agreement with the proposed
mitigation measures in relation to the impact of the proposed development upon otters,
bats and nesting birds. Subject to relevant conditions to ensure that the proposed
development is carried out in accordance with the mitigation measures outlined within the
submitted Preliminary Ecological Appraisal and the Otter and Bat Survey Report and to
secure the provision of a pre-commencement nesting bird survey to ensure that no bird
species are compromised, the proposal would adhere to the requirements of NPF4 Policy
3(d). 
Whilst no specific proposals for biodiversity improvements have been submitted it is
considered that adequate and proportionate measures for biodiversity enhancement and
protection can be delivered by planning condition. Such a condition will be attached to this
permission. With a condition to secure adequate and proportionate biodiversity
enhancement and protection measures within the development, the proposal aligns with
the broad aims of NPF4 Policy 3 and is consistent with the requirements of LDP2 Policy
73, Development Impact on Habitats, Species and Biodiversity. 
5.4. NPF4 Policy 4 – Natural Places 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
Page 96

Page 97

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
NPF4 Policy 4(a) states that development proposals which by virtue of type, location or
scale will have an unacceptable impact on the natural environment, will not be supported.
In this instance, the proposed development relates to the addition of a small scale
extension to an existing building to facilitate the conversion of the building to form a
dwellinghouse. The proposal would make use of an existing building and its setting, and
the proposed extension would be of a small scale such that there would be no adverse
impact upon the surrounding environment. 
The application site lies within the Loch na Keal National Scenic Area, designated for its
coastal scenery, expansive seascape and interior mountain peaks. The application site
lies within the Outer Loch na Keal Area, which comprises relatively level terrain and
alluvial deposits. The development would be set against the backdrop of rugged steeper
slopes and would make use of an existing building to ensure that the development would
not encroach upon undeveloped sites or impact upon key views. The consultation
response received from NatureScot advised that the proposed development would be
sited within the Loch na Keal National Scenic Area, however given the size and scale of
the proposed development and with regard to previous developments within the
application site, the integrity of the National Scenic Area or the qualities for which it has
been designated, would not be adversely affected. It is therefore the considered opinion
of the Planning Authority that the proposal would not result in any significant adverse
effects on the integrity of the area. 
The proposed development is sited within the Lagganulva Wood Site of Special Scientific
Interest, designated for its geological interest and upland oak woodland habitat. The
proposed development would have no ecological connectivity to the site’s qualifying
interests and would not therefore undermine the conservation of the qualifying interests.
In line with the consultee response received from NatureScot, the proposal would not
have a significant effect on the natural heritage interests of national importance due to the
proposed development being sited away from the features for which the site has been
designated. In this regard, the proposal would be compliant with NPF4 Policy 4 and LDP2
Policies 70 and 75. 
Notwithstanding the above, the proposed development is not within any designated
European site of natural environment conservation or protection, it is not located within a
National Park, a RAMSAR site, or a National Nature Reserve. Neither is it located within
a site designated as a local nature conservation site or landscape area or within an area
identified as wild land. 
5.5. NPF4 Policy 5 – Soils 
NPF4 Policy 5 seeks to protect carbon-rich soils, to restore peatlands and to minimise
disturbance to soils from development. 
The development proposed by the current application seeks to develop a rough area of
ground adjacent to the existing barn. In terms of the land capability for agriculture, the
application site falls within Class 5.2 where the land is capable of use as improved
grassland, where pasture establishment may be difficult to maintain. The proposed
development would be of a small scale such that the proposed development would not
impact upon prime agricultural land, or land of lesser quality that is culturally or locally
important for primary use, with due consideration to the extent of the wider agricultural
landholding. 
The application site is located within an area designated as Class 5 Carbon and Peatland,
where no peatland habitat has been recorded. The proposed development would not
therefore adversely impact upon peatland, carbon-rich soils or priority peatland habitat.
Page 97

Page 98

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The development proposed is therefore considered to be in accordance with NPF4 Policy
5 and Policies 79 and 83 of LDP2. 
5.6. NPF4 Policy 6 – Forestry, Woodland and Trees 
NPF4 Policy 6 seeks to protect and expand forests, woodland and trees. 
The application site features a number of large Sycamore trees which are long-established
and are exposed to the prevailing south westerly wind. The application has been submitted
with a Tree Report detailing a general description of the trees present at the application
site, the dimensions and details of the individual trees, and options for their management.
The information submitted with the application indicates that there is a small overlap of the
tree protection zone in the location where the existing barn is sited. The information
submitted with the application advises that any excavation inside the existing barn in this
location would be limited and carried out by hand. The submitted information further
advises that any excavation works in the area adjacent to the tree protection zone would
be excavated by hand. The proposed extension to the existing barn would be sited towards
the southeast corner of the application site, away from the mature trees which are sited
adjacent to the northwest of the existing barn. 
Given the presence of establish mature trees at the site, a suitable condition is required to
secure the provision of a scheme for the retention and safeguarding of trees during
construction work, to include detail on any proposed tree works and a programme of
measures for the protection of trees during construction works. The proposed development
would not adversely impact ancient woodland, veteran trees or native woodland and the
proposed development would not lead to the fragmentation of woodland habitats. Subject
to a suitable condition to secure appropriate tree protection measures, the proposed
development would adhere to the requirements of NPF4 Policy 6 and the provisions of
LDP2 Policy 77. 
5.7. NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings, and to help reduce the need for greenfield
development. 
NPF4 Policy 9(d) provides support for development proposals for the reuse of existing
buildings, taking into account their suitability for conversion to other uses. Given the need
to conserve embodied energy, demolition will be regarded as the least preferred option.
The development the subject of this current application proposes to convert and extend
the existing stone barn at the application site to form a dwellinghouse. The development
proposal would retain the existing stone barn, with repairs to the existing stone walls
undertaken as necessary. It is considered that the conversion of the existing stone barn
would constitute an appropriate redevelopment opportunity whereby the character and
appearance of the existing barn would be retained without the need for significant
alterations. 
The proposed extension would be sited immediately adjacent to the existing barn and in
this regard is considered to be brownfield site and accordingly the use of the land for the
proposed extension is considered to represent the sustainable reuse of brownfield land
which is afforded direct support under NPF4 Policy 9(a). 
The application site lies ‘Outwith Settlement Areas’ in the designated ‘Countryside Area’.
LDP2 Policy 02, Outwith Settlement Areas, seeks to promote a more flexible approach to
development in areas identified as Countryside Area, with Part A of Policy 02 giving a
Page 98

Page 99

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
presumption in favour of sustainable development where it is of an appropriate scale,
design, siting and use for its countryside location, as detailed in the relevant sustainable
siting and design policies. In this instance, the proposal involves the conversion of an
existing barn and the addition of an appropriately scaled and designed extension to form
a dwellinghouse. The scale of the proposed development would be appropriate to the size
of the wider application site and its setting within the landscape. The proposed design
would be of a simple form, respecting local architectural styles and the siting would be
such that it would not appear as obtrusive within the landscape, making use of the existing
built development at the site. 
In this instance, the site is considered to represent an appropriate opportunity for the
conversion, redevelopment and extension to the existing barn to form a dwellinghouse
within the Countryside Area which has been specifically designed with due regard to the
context of the site in terms of its character and appearance and in this regard would be
consistent with NPF4 Policy 9 which does not conflict with the spatial and settlement
strategy set out in LDP2 Policy 02. 
The Council’s Environmental Health Service have been consulted on the application with
regard to previous, potentially contaminative, uses of the site. NPF4 Policy 9(c) states that
where land is known or suspected to be unstable or contaminated, development proposals
will demonstrate that the land is, or can be made, safe and suitable for the proposed new
use. An appropriate planning condition is required to ensure that, prior to the
commencement of development, a phased site investigation and risk assessment is
carried out to identify and assess potential contamination on site. Subject to such a
condition, the proposed development would adhere to the requirements of NPF4 Policy
9(c) and LDP2 Policy 82. 
5.8. NPF4 Policy 12 – Zero Waste 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is consistent
with the waste hierarchy as defined within the policy document. 
The development the subject of this planning application seeks to secure permission for
the conversion of an extension to an existing building to form a new single dwellinghouse.
Whilst this is a development likely to generate waste when operational, it would benefit
from regular waste uplifts by the Council and would be expected to comply with our
adopted and enforced recycling and reuse strategy. In this regard, the proposed
development is considered to be in compliance with NPF4 Policy 12 and does not conflict
with the requirements of LDP2 Policy 63, Waste Related Development and Waste
Management, which seek to ensure that effective provision for waste and recycling are
provided within developments. 
5.9. NPF4 Policy 13 – Sustainable Transport 
This application is seeking to secure permission for a single dwellinghouse which is not
considered to be a significant travel generating use or a proposal where it is considered
important to monitor travel patterns resulting from the development. 
The application site as existing features a vehicular access from the B8073 public road. It
is proposed within this application to upgrade the existing vehicular access into the site
and provide a parking and turning area within the application site, to be sited immediately
to the north of the existing barn. 
The Council’s Area Roads Authority have been consulted on the application and have
raised no objections subject to conditions relating to the construction of the access at the
Page 99

Page 100

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
junction with the public road, the clearance and maintenance of visibility splays, the
provision of a system of surface water drainage, and the provision of a parking and turning
area for two vehicles. 
Subject to the required conditions, the proposed development is consistent with the broad
aims of NPF4 Policy 13 and is consistent with the requirements of LDP2 Policies 35, 37,
39 and 40 which collectively seek to ensure that proposed developments are served by a
suitable and safe access regime and provide appropriate parking provision commensurate
with the scale of the development proposed. 
5.10. NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development
that makes successful places by taking a design-led approach and applying the ‘Place
Principle’. 
The proposed conversion of the existing barn would be undertaken with minimal works to
the existing external appearance of the barn, with works limited to repairs to the existing
stone walls and slate roof, and the installation of windows. It is considered that the siting
of the proposed extension in the existing vacant area between the existing barn and the
public road would ensure that the proposal would not encroach into more undeveloped
areas of the site, thereby reducing its visual impact upon the landscape. New built
development at the site would be limited to the proposed extension, which would have a
modest footprint and an appropriately simple form and appearance. The narrow linear form
would respect local architectural styles and would readily integrate into the application site.
The proposed finishing materials would comprise natural timber cladding, which would
contrast appropriately with the stone walls of the existing barn, giving the proposed
extension a suitably subservient appearance that would read clearly as a later addition.
The use of natural timber cladding would assist in integrating the proposed extension into
the landscape. The proposed extension would be a contemporary addition that would have
a different character to the existing barn, however it would be of a sympathetic design and
appropriately sited such that it would respect the application site and its wider rural context. 
The siting of the access to the north of the existing building ensures that it would be
screened from view when approaching the application site from the south. The proposed
parking and turning area would be facilitated within the courtyard that would result from
the ‘U’ shaped built development at the site. A condition is proposed to remove permitted
development rights normally associated with residential properties in order to protect the
setting of the proposed dwellinghouse from inappropriate development. 
The proposed development is considered to be designed to an appropriate standard to
ensure compliance with the six qualities of successful places set out in NPF4 Policy 14 as
follows. Healthy: being situated within a quiet rural setting but within proximity to an
existing community; Pleasant: being an attractively designed and finished development
that would contribute to the character of the area; Connected: situated immediately
adjacent to the public road, connecting the development to larger settlements; Distinctive:
the design of the development would be of a distinct, high quality design which would
respond to its unique setting whilst respecting the surrounding natural landscape;
Sustainable: the dwelling would utilise appropriately proportioned and designed
fenestration which would maximise potential for natural light; Adaptable: the development
would be of a high quality design that would be capable of adaption for accessibility and
for alternative future uses. 
NPF4 Policy 14(c) states that development proposals that are detrimental to the amenity
of the area will not be supported. ‘Bad neighbour uses’ are uses that can result in a
Page 100

Page 101

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
negative impact upon neighbouring amenity and proposals for development can also
introduce the reverse situation by proposing a sensitive receptor, including housing, in
close proximity to existing operations or land uses where the introduction of sensitive
receptors into these situations could compromise the existing operations. In this instance,
the proposed conversion of and extension to the existing barn to form a dwellinghouse is
not considered to be a ‘bad neighbour’ development given that the application site is sited
at a sufficient distance from the established farm, on the opposite side of the public road.
The proposed development would be well contained within the application site and would
be adequately separate from the farm both physically and visually. The proposed
development would be sufficiently distinct from the farm and its associated activity such
that it is not considered that there would be any adverse impacts upon the sensitive
receptor of the dwellinghouse with regard to noise disturbance, odour pollution or light
pollution that may result from the use of the nearby land for agricultural activity. 
The development the subject of this planning application is considered to be in accordance
with the broad aims of NPF4 Policy 14 and does not conflict with the sustainable siting and
design policies of LDP2 namely Policy 5, Design and Placemaking, Policy 08, Sustainable
Siting, Policy 09, Sustainable Design and Policy 10, Design: all policies which, in summary,
collectively seek to ensure that developments are compatible with surrounding land uses,
are sited sensitively within the landscape making use of existing infrastructure, are of an
appropriate scale, sustainable design and finishes for their site, and ensure that no
adverse visual or amenity impacts arise. 
5.11. NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods 
NPF4 Policy 15 seeks to encourage, promote and facilitate the application of the ‘Place
Principle’ and create connected and compact neighbourhoods where people can meet the
majority of their daily needs within a reasonable distance of their home, preferably by
walking, wheeling or cycling or using sustainable transport options. 
In terms of our adopted settlement strategy, the site of the proposed dwellinghouse is in
an area identified as being Outwith Settlement Areas where LDP2 Policy 02 seeks to
promote a more flexible approach to development in areas identified as Countryside Area,
within which the site is situated, with Part A of Policy 02  giving a presumption in favour of
sustainable development where it is of an appropriate scale, design, siting and use for its
countryside location, as detailed in the relevant sustainable siting and design policies.   
In this instance, it is considered that the small scale of the proposed development, and its
rural location, would reasonably comply with Policy 15 of NPF4 given the existing
dispersed geographical scale of the environment within which the development is to be
located, and given its compliance with the existing settlement pattern and the level and
quality of interconnectivity of the proposed development with the surrounding area where
people can reasonably meet the majority of their daily needs within a reasonable distance
of their home. 
The proposed development aligns with NPF4 and there is no conflict with LDP2 Policy 02. 
5.12. NPF4 Policy 16 – Quality Homes 
NPF4 Policy 16 seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable homes in the right locations and providing choice of
tenure to meet diverse housing needs. 
Policy 16(c) supports development proposals for new homes that improve affordability and
choice by being adaptable to changing and diverse needs, and which address identified
Page 101

Page 102

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
gaps in provision, including ‘self-provided homes’ of which the proposed development
represents. 
With regards to Part (f) of Policy 16(i) an agreed timescale for build-out will be covered
through the use of a planning condition; 16(ii), whilst the development proposed by this
planning application is not on land actively allocated for housing in the LDP2, it would
wholly accord with the adopted settlement strategy and would accord with the principles
of ‘local living’ and ’20 minute neighbourhoods’; 16(iii) the proposal is consistent with NPF4
Policy 17, Rural Homes, being a suitable site which is in keeping with the landscape
character of the area. 
The proposed development is deemed to be consistent with NPF4 Policy 16 and there is
no conflict with LDP 2 Policy 02, Outwith Settlement due to the proposed development
being of an appropriate scale, design and use for its countryside location.   
5.13. NPF4 Policy 17 – Rural Homes 
NPF4 Policy 17 seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable rural homes in the right locations. 
Policy 17(a) supports development proposals for new homes in rural areas where the
development is suitably scaled, sited and designed to be in keeping with the character of
the area. It has been demonstrated at NPF4 Policies 9 and 14 above that the proposed
dwellinghouse is of a suitable scale and design for its countryside location. 
Policy 17(b) requires proposals for new homes in rural areas to consider how the
development will contribute towards local living and take into account identified local
housing needs. It is has already been seen at NPF4 Policy 15 above that the proposed
development is consistent with our adopted settlement strategy policies and that it would
have no materially harmful access or environmental impact. The proposed development
seeks the introduction of a single dwellinghouse through the conversion of and extension
to an existing barn, which would accord with the Council’s key planning policies aims of
supporting and sustaining fragile rural communities by contributing to actions to reverse
our falling rural populations and supporting the local economy. 
Policy 17(c) offers support to new homes in remote rural areas where such proposals (i)
support and sustain existing fragile communities; (ii) support identified local housing
outcomes; and (iii) are suitable in terms of location, access and environmental impact. 
The development proposed accords with the broad aims of NPF4 Policy 17 and does not
conflict with LDP2 Policy 09, Sustainable Development, Policy 10, Design all
Development, and Policy 67, Provision of Housing to Meet Local Needs. 
5.14. NPF4 Policy 18 – Infrastructure First 
NPF4 Policy 18 seeks to encourage, promote and facilitate an infrastructure first approach
to land use, which puts infrastructure considerations at the heart of placemaking. 
Due to the lack of public water or drainage infrastructure within the vicinity of the site, as
was confirmed within the consultation response from Scottish Water, the application
proposes private arrangements comprising a private water supply and a private drainage
system. A condition is required to secure a report on the proposed private water supply to
ensure that it is sufficient to serve the proposed development and does not impact on
existing users of the same supply or adjacent supplies. The Council’s Building Standards
Page 102

Page 103

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Service will apply sufficient control over the septic tank arrangements at Building Warrant
stage. 
With a condition to secure a report on the proposed private water supply, the proposed
development aligns with NPF4 Policy 18 and is in accordance with LDP2 Policy 04,
Sustainable Development, Policy 58, Private Water Supplies and Water Conservation and
Policy 60, Private Sewage Treatment Plants and Wastewater Drainage Systems which
seek to ensure that suitable infrastructure is available to serve proposed developments
and give support to private water supply and drainage arrangements where connection to
the public systems is not available. 
5.15. NPF4 Policy 22 – Flood Risk and Water Management 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
As detailed at NPF4 Policy 18 above, the development the subject of this planning
application proposes a private water supply, the details of which will be sought by planning
condition.   
With regards to the management of rain and surface water at the site, this will be controlled
thorough a condition imposed on the grant of permission to secure a suitable sustainable
drainage system for the site. The proposal aligns with NPF4 Policy 22 and LDP2 Policy
61, Sustainable Drainage Systems. 
6. Other Considerations 
6.1. Public Representation 
The application has been subject to 22 objections.   
The determining factor in the assessment of this application is whether the conversion of
and extension to the existing stone barn to form a dwellinghouse at the site the subject of
this application is consistent with the Development Plan which comprise National
Planning Framework 4 and Local Development Plan 2 and whether the issues raised by
third parties raise material considerations of sufficient significance to withhold planning
permission. 
In this instance, as detailed above, the proposed development would represent a suitable
opportunity for the conversion of, and extension to, an existing barn to form a
dwellinghouse where the development would be of an appropriate scale and design for
its setting. The proposed development would involve the sustainable reuse of the existing
built development at the site, with an appropriately scaled, sited and designed extension,
to form a dwellinghouse. The applicant has addressed the needs of the tenant farmer
through the provision of a replacement agricultural building, as detailed within application
24/00259/PNAGRI, where the replacement agricultural building is of a scale that is
commensurate with the need and its setting within the landscape, is related physically
and functionally to existing buildings associated with the agricultural business, and is
sensitively sited. The information submitted with the application has satisfactorily
demonstrated that, subject to appropriate conditions, there would be no adverse impacts
on biodiversity, nature networks or the natural environment. No objections have been
received from consultees with regards to the proposed infrastructure to serve the
proposed development. 
7. Conclusion 
Page 103

Page 104

LDP2 format template Feb 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
7.1. The detailed information submitted with the application, in the form of the Preliminary
Ecological Appraisal, photomontages, Tree Report, Otter and Bat Report, Design
Statement, and ‘Six Qualities of Successful Places’ Statement have satisfactorily
demonstrated that, in this instance, the proposed development site would represent an
appropriate opportunity for the conversion of and extension to the existing stone barn to
form a sensitively sited and designed dwellinghouse that would be of an acceptable scale,
design and finish that would integrate with the application site and its wider setting within
the landscape. The above assessment has concluded that appropriate servicing and
infrastructure arrangements can be provided to serve a dwellinghouse on the site.
Accordingly, the application is recommended for approval subject to conditions. 
Page 104

Page 105

Reproduced from the Ordnance Survey map with the permission of the Controller of Her Majesty's Stationery Office (C) Crown Copyright 2005
Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or Civil Proceedings.
OS License No. XYZ123ABC
Location Plan Relative to Planning Application: 23/00185/PP
O
1:1,250
Application Site
Page 105

Page 106

This page is intentionally left blank

Page 107

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/02472/PP
Planning Hierarchy: Major Application
Applicant: Ylem Energy Ltd
Proposal: Construction and operation of a battery energy storage system
(BESS) with ancillary infrastructure
Site Address:  Ardencaple Farm, Rhu, Helensburgh  
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• 49.9MW of modular battery units with ancillary equipment (6.1m x 2.5m x
2.9m finished in a matt off white).
• Inverters (9.8m x 5.0m x 2.3m finished in matt off white).
• DNO substation (7.5m x 2.8m x 3.2m finished in matt dark green).
• Switchroom (12.3m x 3.3m x 3.4m raised on 1m stilts finished in matt dark
green).
• Site and welfare office (7.5m x 2.3m x 2.9m finished in matt dark green).
• Site transformer (3.3m x 2.3m x 3.2m finished in matt dark grey).
• Provision of 2 No. on site water towers 
(ii) Other specified operations
• Formation of internal access road 
• Provision of passing places and works to external access road
• Landscaping 
(B) RECOMMENDATION: 
That Planning Permission be refused for the reasons detailed in this report. 
(C) CONSULTATIONS:   
A&B Roads :  Dated (27.03.24, 23.04.24 & 30.08.24):  Objection.
A&B Environmental Health: (Dated 24.09.2024):  Holding Objection. (Lack of  
information on noise generation characteristics of actual plant to be installed within
submitted Noise Report)
A&B Biodiversity Officer: Dated (26.09.24). No objection subject to conditions.
A&B Emergency Planning:     No response
Page 107 Agenda Item 6

Page 108

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
A&B Flooding and Drainage:  Dated ( 27.03.24) No Objection
SEPA : No response
NatureScot :                   Dated (08.03.24) No Comment Offered
Scottish Fire and Rescue : Dated (27.03.24) No Objection. (technical
requirements)
Rhu and Shandon CC :  Dated  (23.04.24) Objection
Helensburgh CC :           Dated (29.07.24) Objection
Network Rail : Dated (11.04.24 & 08.05.24) No Objection subject to conditions 
(D) HISTORY:  Y
23/01276/PAN :  Installation of 50Mw Battery Energy  Storage System
24/00674/SCREEN : Installation of 50Mw Battery Energy  Storage System . No EIA
required. 
(E) PUBLICITY:  Yes 
Reg 20  Press Notice. Expired 04.04.24 
(F) REPRESENTATIONS:  Yes 
The application at time of writing has received 63 Objections, One submission in support
and three representations. A petition with 36 signatures objecting to the proposals has also
been submitted. A full list of these is contained at Appendix B of this Report .  All third party
submissions are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website. 
Members are requested to note that Jackie Baillie MSP forwarded a number of objection
letters on behalf of her constituents. All of these have been recorded as objections and are
Public Access at the link above. For clarity, no objection by Jackie Baillie MSP has been
lodged.
(i) Summary of matters in Submission of Support
• Proposal should be fully supported if we want to have a greener future
•  Battery Energy Storage an essential part of green energy delivery 
(ii) Summary of objections raised: 
• Alternative Site Assessment exercise is flawed in omitting any land in the National
Park. No reason to exclude land in national park within 3km radius site search as
there is no presumption against BESS proposals in National Parks. No compelling
argument has been made to justify why the development needs to be located inside
the greenbelt and so close to a site with specific ecological designations. 
• No evidence provided to show major local landowners in area were not willing to
accommodate the BESS proposals on other land. Landowners/Estates have already
shown willing to accommodate BESS proposals on their land and no evidence to
show they were not willing to engage on their land provided in site selection
justification submissions. Glen Fruin or beside the recycling centre at Blackhill would
be a better location for this use.
• This is not an acceptable use within the Green Belt and is contrary to Planning Policy
in relation to acceptable uses in the greenbelt.
• No clarification on how connection will be made to Substation at Glen Fruin.
Understood from consultation that a cable will be laid along Paterson Drive, Duchess
Street, Queen Drive, Queen Street and Sinclair Street. This will cause significant
disruption. Actual linkage distance is over 3km so site not viable by applicants own
site selection criteria.
Page 108

Page 109

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Submissions by applicant accept Green Belt and visual impact will not be mitigated
by trees which will take 10-15 yrs to have any significant impact
• Industrial scale development will detract from enjoyment of Duchess Wood and hum
from the operation of the BESS even when not in use will have an adverse impact
on the ability to enjoy the woodland for wellbeing and also disturb wildlife, particularly
Bats in the woods which are European Protected Species.
• Proposed access arrangements appear unsatisfactory after Patterson Drive ends.
Access proposed does not follow draft guidance in National Fire Chief’s Council
recommendations on access arrangements for BESS facilities. 
• Any fire at the battery scheme would require the closure of the railway line due to its
proximity and be harmful to the economy as this is a main line connection. Also the
nearest mains connection is some 1 km away in Paterson Drive to supplement the
water to be stored on site in the water tank
• Construction Traffic Management Plan fails to adequately address potential hazards
associated with the local access regime with insufficient passing places to allow
construction vehicles to safely interact with walkers, horse riders, cyclists etc who
regularly use the access track.  It also fails to reference the core path status of the
access track from Peterson Drive. Access track wholly unsuitable for construction
traffic and parking associated with construction workers likely to cause disruption to
residents and danger for children
• Construction of site will leave the area an eyesore due to machinery churning up
access and roads and will be a safety hazard to school children and other residents.
• BESS will be visible from core path network in Duchess Woods. The woods are
widely used by residents, schools for nature studies and Nursery school nature trips. 
The BESS proposals will adversely impact on the enjoyment of the woods.
• Proposals would destroy the local landscape
• Batteries likely to need replaced at end of operational life. Concerns over
environmentally sound method of disposal.
• Some of the documents are classified as preliminary/outline/proposed and are not
specific on what is being installed and what the risks are. These details are to be
determined at construction stage. This gives “remarkable” freedom to developer.
Concerned. It is also stated that further noise assessments will be needed as the
actual technology to be used not specified in the noise report.
• Concerned about the noise this proposal will generate. Particularly at nighttime.
Concerned the submitted Noise Report underplays impact that noise will have on
residents using their gardens and those using the core path to the north of Duchess
Woods. Unit will give out a constant hum detrimental to the amenity of the area and
enjoyment of Duchess Woods. Train noise comes and goes the BESS will always
be making a noise.
• Proposals fails to provide any local community benefits as required under NPF 4
Policy 11 (c) related to Energy Developments
• Facility, including the battery units, switch room and lighting columns will all be
visible from within Duchess Woods to the detriment of its natural setting and amenity
• Additional noise measurements should be taken from the footpath below the
proposed development within Duchess Woods. 
• Friends of Duchess Woods Confirm that there are Bats within the adjoining
woodlands which could be adversely impacted by the operation of the development.
• Borehole data is old and it is unclear if the proposed drainage mitigation measures
will cope and be able to contain all water within the site and not adversely impact on
watercourses and footpaths below the site. Fresh surveys and information on these
matters should be submitted.
• Lighting and noise from use proposed could adversely impact upon wildlife in the
area. ( reference to lighting/motion sensors and bats in adjoining woodland)
Page 109

Page 110

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Does not comply with policies of development plan and adverse impacts are not
outweighed by national need and in principle support for renewables which have
zero benefits for the local community.
• Concerns that Biodiversity net gain not addressed (Officer Note* Additional
submissions were made on this matter by applicant after objection lodged).
Officer Comment : The objections as set out above are considered capable of being material
planning considerations and these matters are addressed in the Officer report. However,
the following matters raised are not considered to material planning considerations which
should be given weight in the determination of the proposals as set out below;
• There is a fire risk and health and safety issue due to toxic gasses released in the
event of a fire with such developments which should not be near residential
properties.
• Network Rail have raised issues over access being allowed under the rail bridge for
the use proposed.
• A full EIA is required to properly evaluate the proposal.
• Treatments to maintain landscaping could adversely impact through washout from
the site and adversely impact upon Duchess Woods which is a Local Nature
Reserve
• Use of Lithium Batteries will create an unacceptable risk to trains and those who use
footpaths in the area.
• Concerns over the PAN commitments not being adhered to, and residents not being
consulted with a 750m Radius of the site. (Officers note that the party involved
attended one of the PAC consultation events).
• The proposal is speculative and ill considered. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact
Assessment Report:
☐Yes ☒No 
(ii) An Appropriate Assessment
under the Conservation (Natural
Habitats) Regulations 1994:   
☐Yes ☒No 
(iii) A Design or Design/Access
statement:   
☒Yes ☐No 
Green belt Location
Access to Site
Scale and Nature of Proposals  
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability
Checklist
TN07 Sustainable
Buildings Checklist
☒Yes ☐No
☐Yes ☒No  
(v) A report on the impact of the
proposed development e.g.
Retail impact, transport impact,
☒Yes ☐No 
Page 110

Page 111

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
noise impact, flood risk,
drainage impact etc:  
• Planning Statement (including
Design and Access
Statement)
• Pre-Application Consultation
report (PAC)
• Landscape and Visual
Appraisal (LVIA)
• Green Belt Justification
• Heritage Assessment
• Lighting Assessment
• Noise Assessment
• Ecological Appraisal Report
• Outline Construction
Environment Management
Plan
• Outline Construction Traffic
Management Plan
• Battery Safety Report
• Outline Battery Safety
Management Plan
• Heat Flux Study
• Drainage Assessment
• Flood Risk Assessment
• Alternative Site Assessment
• Economic Benefits Statement 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application. 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 3 – Biodiversity
Page 111

Page 112

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 8 – Greenbelts
NPF4 Policy 11 – Energy 
Liveable Places
NPF4 Policy 23 – Health and Safety (Criteria e - Noise) 
Productive Places
NPF4 Policy 25 – Community Wealth Building 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 02 – Outwith Settlement Areas (Part C Helensburgh Greenbelt) 
High Quality Places
Policy 06 – Green and Blue Infrastructure
Policy 08 – Sustainable Siting
Policy 10 – Design – All Development
Policy 14 – Bad Neighbour Development 
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment 
Diverse and Sustainable Economy
Policy 30 – The Sustainable Growth of Renewables 
Connected Places
Policy 35 - – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private        
Road
Policy 39 – Construction Standards for Private Access 
Sustainable Communities
Policy 55 – Flooding
Policy 59 -  Water Quality and the Environment
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 62 – Drainage Impact Assessments 
High Quality Environment
Policy 73 – Development Impact on Habitats, Species and Biodiversity.
Policy 76 – Development Impact on Local Nature Conservation Sites (LNCS) 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Scottish Energy Strategy: The future of energy in Scotland (“the Energy
Strategy”) Draft Scottish Energy Strategy and Just Transition Plan 2023
• Scottish Government Climate Change Plan 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☒Yes  24/00674/SCREEN. No EIA required.  
Page 112

Page 113

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL  
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☒Yes   
PAC Report Submitted with application. Report states main issues identified through
Community Consultation exercise were: 
• Location: including within Green Belt, open countryside, available            
alternatives, closer to the electricity substation.
• Access: including passing through residential area, the low railway bridge,
steep track and use of track by other users such as walkers and horses.
• Grid connection: how will this be achieved and impact on local residents.
• Wildlife: including noise, visual, impact on Duchess Wood.
• Safety both in terms of construction safety and operational safety and how
will an emergency be dealt with. 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
This application has attracted 63 letters of objection. In addition, both Helensburgh
and Rhu and Shandon Community Councils have objected to this application. 
Whilst, there is strong policy support within NPF 4 Policy 11 and LDP 2 Policy 30 for
energy related proposals such as this BESS scheme to be supported, officers
consider that there are three reasons for the refusal of this application relating to the
lack of justification for this greenbelt location and the adverse landscape and visual
impacts on the greenbelt, the lack of a suitable vehicular access to the site and
insufficient information relating to noise impacts. 
It is considered that Members have sufficient information within the report to enable
them to determine this application.  In these circumstances it is not considered that
a pre-determination Hearing would add value to the process. 
(O)(i) Key Constraints/Designations Affected by the Development:
• Helensburgh Green Belt
• Duchess Woods Local Nature Conservation Area
(O)(ii) Soils
Agricultural Land Classification:  Class  4.2 Grazing Land
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification:  N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☒No ☐N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☒No ☐N/A
Page 113

Page 114

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☐Yes
☒No 
Does the proposal include any replacement or
compensatory planting?
☒Yes Landscaping Mitigation Plan with
Biodiversity Enhancement 
☐No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☐Countryside Area
☐Remote Countryside Area
☒Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Summary assessment and summary of determining issues and material
considerations
The application submission has in the opinion of officers failed to demonstrate that a
greenbelt location is essential for the location of the development due to the exclusion of all
greenfield land within the Loch Lomond and the Trossachs National Park Area at an early
stage in the site search exercise. This has resulted in the identification of a site, within a
sensitive greenbelt location some 2.7km from the required substation connection point on
the edge of the settlement of Helensburgh. Officers therefore consider insufficient
justification to prove the need to locate the development within the Helensburgh Greenbelt
has been provided by the applicant.   
In addition, the field within which the development is proposed to be located, forms an
integral and important part of the greenbelt at this point, framing the settlement of
Helensburgh and providing an open context for attractive and important views of the town
and beyond to the Clyde Estuary. Officers consider the quality of this view to be extremely
high and therefore its sensitivity to adverse impact is also high. The proposed development
would unacceptably undermine the function and openness of the greenbelt at this point by
introducing industrial scale development. 
The application fails to provide either a private access road to the site, or an access track
within the site to the BESS facility to an acceptable and safe standard for emergency
services access. The Area Roads engineer considers that the proposed access
arrangements are unacceptable and contrary to LDP 2 Policies 35, 37 and 39 of Argyll and
Bute Local Development Plan 2. In addition, the proposed access arrangements fail to meet
the desired guidelines and standards of the Scottish Fire and Rescue Services to access
such facilities as set out in their consultation response to this application. 
The submitted noise report fails to provide sufficient confidence to  Environmental Protection
Officers that there will not be any adverse noise impacts on surrounding area which includes
Page 114

Page 115

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
residential properties.  Adequate details have not been provided within the submitted Noise
Impact Assessment. The proposals are therefore considered to be contrary to LDP 2 Policy
14 amenity safeguarding objectives in respect of potential noise impacts. 
However, given that the proposal is for essential energy infrastructure which contributes to
addressing the Climate emergency and the objectives of NPF4 Policy 1, it must be
acknowledged in the decision-making process that there is strong policy support for such
proposals. As this recommendation to refuse the current application is a matter of officers
balancing competing policy objectives, it is essential that the strong policy support for such
proposals is also considered as set out in LDP2 Policy 30 and NPF 4 Policy 11 in coming
to a Planning decision in this case. This is not in Officers opinion a clear-cut matter, and the
significance of the contended and potential adverse impact, non-compliance with roads
Standards and inadequate noise information submission,  must be considered in the
balance against this strong Energy Policy support for such proposals.   
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Refused: 
Unacceptable Adverse Impact on Helensburgh Green Belt. 
1. The proposed development by nature of its scale. appearance and location will introduce
development of an industrial character and appearance into a sensitive and important
greenbelt location. contrary to LDP 2 Policies  02 and 30, and NPF 4 Policies 8 and 11.   
More particularly,
a) The application submission has failed to demonstrate that a greenbelt location is
essential for the location of the development due to the exclusion of all greenfield
land within the Loch Lomond and the Trossachs National Park Area at an early stage
in the site search exercise. This has resulted in the identification of a site, within a
sensitive greenbelt location some 2.7km from the required substation connection
point on the edge of the settlement of Helensburgh. Officers therefore consider
insufficient justification to locate the development within the Helensburgh Greenbelt
has been provided by the applicant.  
b) In addition, the field within which the development is proposed to be located,  forms
an integral and important part of the greenbelt in framing the settlement of
Helensburgh and providing an open context for attractive and important views of the
town and beyond to the Clyde Estuary. Officers consider the quality of this view to
be extremely high and therefore its sensitivity to adverse impact is also high. The
proposed development would unacceptably undermine the function and openness of
the greenbelt at this point by introducing industrial scale development. 
By nature of the above matters set out at (a) and  (b) the proposal is considered to
be contrary to NPF 4 Policy 8 and LDP 2 Policy 02. 
Substandard Access  Roads and Site Access Road for Emergency Service
Vehicles 
2. The application fails to provide either a private access road to the site, or an access track
within the site to the BESS facility to an acceptable and safe standard for emergency
Page 115

Page 116

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
services access. The Area Roads Engineer considers that the proposed access
arrangements are unacceptable due to the unsatisfactory intervisibility and width of the
private access road to the site, and unacceptable gradients on the proposed internal
access road within the site contrary to LDP 2 Policies  35, 37 and 39 of Argyll and Bute
Local Development Plan 2. 
In addition, the proposed access arrangements fail to meet the desired guidelines  and
standards of the Scottish Fire and Rescue Services to access such facilities as set out
in their consultation response to this application. More particularly the proposals fail to
provide at least two separate access points to the site to account for opposite wind
conditions/directions, a perimeter road or roads with passing places for fire service
vehicles to an adequate standard, or access arrangements with no extremes of gradient. 
Noise Generation and Potential Amenity Impacts 
3..The submitted noise report fails to provide sufficient confidence to Environmental
Protection Officers that there will not be any adverse noise Impacts on surrounding area
which includes residential properties.  Adequate details have not been provided within
the submitted Noise Impact Assessment. The proposals are therefore considered to be
contrary to LDP 2 Policy 14  amenity safeguarding objectives in respect of potential noise
impacts. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: David Moore Date: 07.10.2024 
Reviewing Officer: Sandra Davies Date: 09.10.2024 
Fergus Murray
Head of Development & Economic Growth 
Page 116

Page 117

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
REASONS FOR REFUSAL RELATIVE TO APPLICATION REF. NO. 23/02472/PP 
1. Unacceptable Adverse Impact on Helensburgh Green Belt. 
The proposed development by nature of its scale. appearance and location will
introduce development of an industrial character and appearance into a sensitive and
important greenbelt location. contrary to LDP 2 Policies  02 and 30, and NPF 4 Policies
8 and 11.  
More particularly,
a) The application submission has failed to demonstrate that a greenbelt location
is essential for the location of the development due to the exclusion of all
greenfield land within the Loch Lomond and the Trossachs National Park Area
at an early stage in the site search exercise. This has resulted in the
identification of a site, within a sensitive greenbelt location some 2.7km from
the required substation connection point on the edge of the settlement of
Helensburgh. Insufficient justification to locate the development within the
Helensburgh Greenbelt has been provided by the applicant.  
b) In addition, the field within which it  the development is proposed to be located, 
forms an integral and important part of the greenbelt in framing the settlement
of Helensburgh and providing an open context for attractive and important
views of the town and beyond to the Clyde Estuary. The quality of this view is
considered to be extremely  high and therefore its sensitivity to adverse impact
is also high. The proposed development would unacceptably undermine the
function and openness of the greenbelt at this point by introducing industrial
scale development. 
By nature of the above matters set out at (a) and (b) the proposal is considered to be
contrary to NPF 4 Policy 8 and LDP 2 Policy 02. 
2. Substandard Access Roads and Site Access Road for Emergency Service
Vehicles 
The application has failed to provide either a private access road to the site, or an
access track within the site to the BESS facility to an acceptable and safe standard
for emergency services access. The proposed access arrangements are
unacceptable due to the unsatisfactory intervisibility and width of the private access
road to the site, and unacceptable gradients on the proposed internal access road
within the site contrary to LDP 2 Policies  35, 37 and 39 of Argyll and Bute Local
Development Plan 2. 
In addition, the proposed access arrangements fail to meet the desired guidelines 
and standards of the Scottish Fire and Rescue Services to access such facilities
as set out in their consultation response to this application. More particularly the
proposals fail to provide at least two separate access points to the site to account
for opposite wind conditions/directions, a perimeter road or roads with passing
places for fire service vehicles to an adequate standard, or access arrangements
with no extremes of gradient. 
3. Noise Generation and Potential Amenity Impacts 
The applicant has failed to provide sufficient information to satisfy the planning
authority that there will not be any adverse noise Impacts on the surrounding area
which includes residential properties.  Adequate details have not been provided within
Page 117

Page 118

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
the submitted Noise Impact Assessment. The proposals are therefore considered to
be contrary to LDP 2 Policy 14  amenity safeguarding objectives in respect of potential
noise impacts.  
Page 118

Page 119

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  REF: 23/02472/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Settlement Strategy 
1.1. The application site is situated within the Helensburgh Green Belt where stricter controls
over both the type of development which is allowed is exercised as per LDP 2 Policy 02
and NPF 4 Policy 8. These policies also clarify the need to ensure that where a
development is acceptable on point of principle within a greenbelt location, there requires
to be a justification as to why the development has to locate in the greenbelt and further
that where this has been demonstrated that no unacceptable impacts upon the greenbelt
will occur. It is considered helpful to refer to the main elements of both policies at this
point for ease of reference and to assist in the settlement strategy policy evaluation
process for such proposals within a greenbelt location. 
1.2. The starting point for the evaluation of the proposals in respect of their greenbelt context
is to ask whether the proposals are “essential infrastructure” which can be located within
the greenbelt as a point of principle. It is perhaps useful to provide some context as to
how BESS proposals should be regarded in terms of their role in meeting climate change
objectives and therefore be regarded as essential infrastructure. 
1.3. A recent S36 decision of the Scottish Ministers on a  BESS proposal usefully clarifies the
role BESS can  make to addressing the climate emergency and achieving net zero targets
as set out in NPF 4 Policy 1; 
The generation of electricity from batteries is not in itself a renewable source of energy;
Scottish Ministers do however regard the proposed Development as essential
infrastructure. The proposed Development, through provision of energy storage, adds
flexibility and resilience necessary to maintain secure and reliable supplies of energy to
all of our homes and businesses as our energy transition takes place. Scottish Ministers
conclude that the proposed Development is supported by the Energy Strategy… The Draft
Scottish Energy Strategy and Just Transition Plan 2023 signals that strong support from
the Scottish Government for battery storage remains. 
1.4. Therefore, although officers consider that BESS proposals can properly be regarded as
essential infrastructure related to facilitating the important objectives addressing climate
change and achieving net zero objectives, it is also necessary to ensure compliance with
LDP Policy 02 and NPF 4 Policy 8 in respect of greenbelt development. 
1.5. Both NPF 4 and LDP 2 policies require that application proposals within the greenbelt
demonstrate a need to be located within the greenbelt. NPF 4 Policy 8 clarifies that as
well as comprising essential infrastructure (which is accepted by officers) proposals must
also ensure 
ii) the following requirements are met: 
• reasons are provided as to why a green belt location is essential and why it
cannot be located on an alternative site outwith the greenbelt; 
Page 119

Page 120

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
1.6. LDP 2 Policy 02 also clarifies that: 
Within the Helensburgh and Lomond Green Belt development will only be supported
where this is appropriately designed, located and landscaped and comprises. 
• Development directly supporting the provision of essential infrastructure with a
demonstrable need to be located within the Green Belt. 
1.7. In order to justify the location of the BESS proposal within Helensburgh Green Belt
additional submissions clarifying why the current greenbelt site was chosen have been
submitted by the applicant and a sequential alternative site assessment report dated July
2024 has been provided. Page 8 of the submitted supporting statement confirms that “In
this case it was identified that the Helensburgh Grid Supply Point, located roughly 2700m
North-East of the Proposed Development Site, had the capacity to support a 50MW
connection. 
1.8. Officers note from this submission that all greenfield land within the Loch Lomond and the
Trossachs National Park  was excluded on point of principle from the search parameters,
and an area of land on the edge of the greenbelt some 2.7km away has been identified
as the best location for the BESS facility by this evaluation approach. It is the opinion of
officers that this site search information does not provide sufficient justification on the
need for a  greenbelt location for this development in accordance with policy requirements
as all greenfield land within the National park has been excluded. No evidence as to why
this is a justified approach has been provided. 
1.9. There is no policy presumption against BESS proposals within a National Park as shown
by the approval of such a scheme by Cairngorms National Park Authority of Detailed
Planning Permission 2022/0069/DET (22/00601/FUL)  for Construction of battery energy
storage facility (49.9MW), control building, switch room, battery storage containers,
inverter containers, landscaping and associated works. 
1.10. Officers do not seek to compare the merits or the detailed evaluation of the current
proposal and the approved proposal. However, this approval does raise fundamental
questions as to why all greenfield land within the National Park, which is in closer proximity
to the required substation connection point, and would appear to be less sensitive, was
excluded from the search parameters at such an early stage in the sequential evaluation
exercise. 
1.11. Added to this omission, the sensitivity and importance of the greenbelt location proposed,
with its proximity to a Local Nature Conservation Site and substandard access
arrangement, appear from the alternative site evaluation submissions not to have been
given sufficient weighting in choosing the current site, despite these clearly being criteria
which should have been considered under the applicant’s own site search and evaluation
exercise. 
1.12. Therefore, Officers do not consider that a convincing case has been made as to why the
BESS facility must be located on the greenbelt site proposed. Where there are concerns
over adverse impacts this is a material consideration, in the view of officers, which counts
against the approval of the proposals. Potentially less sensitive sites within the National
Park have not been properly evaluated, and even if in principle such proposals can be
acceptable in the greenbelt , they are required in respect of both NPF 4 Policy 8 and LDP
2 Policy 02  to demonstrate a need to locate within the Helensburgh Greenbelt. The
submissions fail to satisfy officers on this point.
Page 120

Page 121

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
1.13. Had the need to locate within the greenbelt been justified as required to the satisfaction
of officers, there are also further requirements to evaluate the impact of the development
on the greenbelt which relate to site specific considerations. More detailed evaluation of
the potential impacts of the development upon the greenbelt and its character and function
at this point is provided at Section 3 of this report. 
2. Location, Nature and Design of Proposed Development 
2.1. The proposed site is located at Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute
approximately 1km North-East of Rhu, on approximately 0.5ha of agricultural land
currently used for pasture. The site is bounded by a combination of vegetation and rail
fencing with the railway line running along the southern boundary. The nearest residential
properties, are identified in submissions as being located approximately 450m to the
south east on McLeod Crescent and Paterson Drive. 
2.2. Beyond the railway line to the South lies Duchess Woods a designated Local Nature
Conservation Area and an extremely valuable community facility which is well used by
local residents as an amenity resource. 
2.3. The purpose of the Proposed Development would be to install a Battery Energy Storage
System (BESS) which would provide standby, emergency electricity for National Grid in
times of high electricity demand or when renewable energy projects are unable to fulfil
demand. This would be for the installation of: 
• 49.9MW of modular battery units with ancillary equipment (6.1m x 2.5m x
• 2.9m finished in a matt off white).
• Inverters (9.8m x 5.0m x 2.3m finished in matt off white).
• DNO substation (7.5m x 2.8m x 3.2m finished in matt dark green).
• Switchroom (12.3m x 3.3m x 3.4m raised on 1m stilts finished in matt dark
• green).
• Site and welfare office (7.5m x 2.3m x 2.9m finished in matt dark green).
• Site transformer (3.3m x 2.3m x 3.2m finished in matt dark grey).
• Erection of acoustic barrier Fence along Southern Boundary 
2.4. In order to account for the topography, the application proposes to create a two-tiered
site. All equipment would be sited on individual concrete slabs and the site made suitable
for servicing by commercial vehicles as shown in submitted Appendix A2: Site Layout
Plan. An access road would be provided utilising the existing Ardencaple Farm access
road off Paterson Drive and entering the site from the north. 
2.5. The battery containers and ancillary equipment would be painted in a muted green colour
to be agreed with the Local Planning Authority. The development would be secured by a
2.4 metre high mesh welded security fence, with the western and southern boundary
being a 3.0m wooden acoustic fence. 
2.6. Additional landscaping details in the form of tree and shrub planting has been proposed
by the applicant to both assist screening as assimilation of the development into the
landscape and to ensure a biodiversity net gain associated with the proposals. 
2.7.  It is worth noting at this point that the applicant’s own submissions indicate that the
equipment proposed is not fixed, and a conditional approval to allow changes to the actual
plant/machinery to be installed has been suggested in submissions. This matter is
Page 121

Page 122

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
addressed in more detail at section 4 which evaluates the potential noise characteristics
of the development. 
3.  Greenbelt and Landscape Evaluation 
3.1. As has been set out at Section 1 of this report, the application seeks to locate a BESS
facility on a site within Helensburgh greenbelt. The development will therefore require to
address the policies which apply to greenbelt development in their entirety. As has been
set out at Section 1, even if the location of the development within the greenbelt had been
satisfactorily justified, there are also a number of other relevant policy requirements which
development proposals must satisfy. Relevant extracts of these policies are set out below. 
3.2. LDP 2 Policy 02 clarifies, inter alia, that applications : 
will also be required to demonstrate that there will be no unacceptable adverse effects
(either individually or cumulatively) on natural heritage resources, built and/or cultural
heritage resources, and landscape and visual amenity..... 
3.3. ....Within the Helensburgh and Lomond Green Belt development will only be supported
where this is appropriately designed, located and landscaped 
3.4.  LDP 2 Policy 04 which relates to sustainable development requires that; 
In preparing new development proposals, developers should seek to demonstrate the
following sustainable development principles, which the planning authority will also use
in deciding whether or not to grant planning permission... 
i) Respect the landscape character of an area and the setting and character of
settlements; 
3.5.  LDP 2 Policy 08 in respect of sustainable siting states 
Each of the following will apply when assessing any proposal for development...... 
• The development should integrate into the landscape or existing built form to minimise
detrimental effects on the environment. Particularly careful attention should be given to
hilltop, skyline or ridge locations, where development will only be acceptable if such a
location cannot be avoided and any significant adverse landscape and visual effects are
clearly outweighed by social, environmental or economic benefits of community wide
importance arising from the development proposal, and have been sufficiently mitigated
through an environmental impact assessment or landscape and visual impact
assessment.
.
3.6. LDP 2 Policy 10, which sets out the design principles applicable to all development,
requires that; 
The design of any development must: 
• Demonstrate an understanding of and appropriate response to the proposed
development site and wider context including consideration of character and, where
applicable, urban grain;.... 
Page 122

Page 123

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
3.7. NPF 4 Policy 8 also requires that for development in the greenbelt, where is locational
need is justified, that 
The character, landscape, natural setting and identity of settlements is protected and
enhanced. 
3.8. Officers are aware of the strong support for BESS proposals given within both NPF4 and
LDP 2 Energy Related Policies and these will also be evaluated at a later stage in the
report.  The proposed site for this industrial scale BESS development, in Officers view, is
on an integral and important component part of the greenbelt at this point. Although it is
accepted that views are constrained along the access road to the site by hedges and that
the greenbelt compartment is formed by boundary hedgerows to the east and west , these
do not form part of the application site and are not within the control of the applicant to
secure their retention. Therefore their screening role cannot be guaranteed for the future. 
Importantly, this is a well-used access road for residential, business and recreational
users and there is an important viewpoint over the site at the site entrance opposite Cherry
Wood stables.  From this well used vantage, the field within which the application is
proposed, forms an important and open compartment of the greenbelt where the open
views are an important contributor to the open character of the greenbelt at this point. 
3.9. The field where the application is proposed, in the opinion of officers, forms a critical
element in defining the openness of the greenbelt at this point, and contextualising and
framing the setting of the settlement of Helensburgh in an attractive manner. The field
both frames the settlement and also provides the desirable open context for longer range
views of Helensburgh and the Clyde Estuary beyond. The quality of this view and the vital
role this field plays in facilitating open and attractive vistas within the greenbelt is, in
officer’s opinion, of clear importance. The proposed development would, in Officers
opinion, unacceptably harm and undermine the greenbelt at this point by introducing a
large industrial scale development into an important greenbelt compartment to the
detriment of the greenbelt and its role at this point. The proposals are therefore considered
to be contrary to LDP 02 Policies 02, 04, 08 and 10 objectives and also NPF 4 Policy 8
requirements. 
3.10. However , given that the proposal is related to the delivery of a renewable energy based
system which supports addressing the roll out of renewable grid infrastructure in
accordance with NPF 4 and wider Government climate change objectives, it is also
necessary to balance any conflicts with the above policies with the  extremely supportive
policies within LDP 2 and NPF 4 for energy related development (as well as other climate
change related Scottish Government advice as set out in the material considerations
section of this report). Further policy evaluation related to these supportive energy policies
is set out below. 
NPF 4 and LDP 2 Energy Policy Evaluation 
3.11. Given that the proposal is for essential energy infrastructure which contributes to
addressing the Climate emergency and the objectives of NPF4 Policy 1, it must be
acknowledged in the decision making process that there is strong policy support for such
proposals. As this recommendation to refuse the current application is a matter of officers
balancing competing policy objectives, it is essential that Members in coming to a planning
judgement, also take into account the strong policy support for such proposals set out in
LDP2 Policy 30 and NPF 4 Policy 11 in coming to a Planning decision in this case. This
is not, in Officers opinion, a clear-cut matter, and the significance of the contended and
potential adverse impact, non-compliance with roads standards and inadequate noise
information submission, must be considered in the balance against this strong Energy
Policy support for such proposals as referenced. LDP 2 policy 30 states;
Page 123

Page 124

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
The Council will support renewable energy developments where these are consistent
with the principles of sustainable development and it can be adequately demonstrated
that there would be no unacceptable environmental effects, whether individual or
cumulative, on local communities, natural and historic environments, landscape
character and visual amenity, and that the proposals would be compatible with adjacent
land uses….In assessing any application the Council will additionally have regard to the
opportunities for energy storage, local energy networks, and long term environmental
management of the site. 
3.12. NPF 4 Policy 11 clarifies that: 
a) Development proposals for all forms of renewable, low-carbon and zero emissions
technologies will be supported. These include: 
iii. energy storage, such as battery storage and pumped storage hydro; 
3.13. Notwithstanding these energy policies and other policy advice which strongly support the
approval of BESS proposals, and which the council is supportive of, there are specific
locational and site constraint issues associated with this particular proposal which officers
consider are unacceptable and outweigh the policy support in principle for such
developments as set out in this report. 
4. Noise and Amenity 
4.1. The submitted Noise Report confirms that the ‘discharge’ process is when noise emissions
are at their maximum, with the cooling systems to all of the plant operating at a much higher
capacity (and thus noisier level) during discharge compared to the majority of the day/night
when energy is being drawn/stored. The discharge hours would be dictated by the demands
of the National Grid, but would likely occur between around 07:30 and 20:30, not for this
whole period, but typically for up to 2 hours at a time. Officers note that the submitted Noise
Report states: 
…. that should planning permission be granted, that this would include a planning condition
which requires a further assessment to be submitted prior to construction / once the design
has been finalised and the exact manufacturers/model numbers of all of the plant are
known, given that the design could conceivably change. 
The Council’s Environmental Protection officer has evaluated the submitted noise report
which seeks to address noise concerns expressed by residents. In his response dated
24.09.24 the Environmental Health Officer confirms that; 
With regards to the Noise Impact Assessment submitted in connection with the above
planning application, although the methodology of the assessment was competent, it is
fully acknowledged that it was based on an assumed variety of equipment that may be in
place on the BESS site. In order that we can be satisfied that the amenity of the local
residents could be protected, we would need to see an assessment based on date of the
actual equipment to be used as there will likely be variation in terms of both general
sound level and frequency spectra. Any controls noted thereof would have to be in
relation to the assessment of sound produced from the actual equipment to be installed.
We would also need to see information on “tick over” sound levels and any impact on
start up/shut down between tick-over and fully operational as it is these changes of noise
states that are more attractive to any listener. 
Page 124

Page 125

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
4.2. The above response clarifies that the methodology of the report is agreed, but failing to
commit to the actual plant/machinery to be installed on the site, and suggesting that a
suspensive condition would be expected to cover this, leaves any evaluation of resultant
nose levels at sensitive receptor locations and changes in noise levels without the
necessary certainty to ensure this matter is properly addressed. In an addendum response
to this above (dated 04.10.24) the Environmental protection officer further comments that; 
I note that there was no vibration assessment undertaken for the initial BESS submission.
We would require this to be undertaken and mitigations identified as required. 
4.3. In respect of the objections raised about the potential noise disturbance to users of Duchess
Woods, which is a well-used and high-quality amenity area rich in wildlife (designated as a
Local Nature Conservations Site and Local Nature Reserve). Officers note: 
• the failure to clearly commit to the exact type of equipment to be installed and its noise
output and vibration characteristics, 
• the lack of clarity on 24 hr operational noise output characteristics of that equipment, 
• the lack of detail on predicted noise impact on the core path route within Duchess
Woods at its closest point to the development, 
4.4. All these matters in Officers’ opinion represent a deficiency of the application submissions.
Had this been a less sensitive adjoining use, such matters would be less material to the
determination, however Duchess Woods is a highly regarded and valued Local Nature
Reserve formally identified in the Statutory Plan and a Local Nature Conservation Site
where members of the public  should legitimately expect (subject to train noise incidents)
they can enjoy nature. It is therefore considered to be a sensitive receiving environment by
Officers. 
4.5.  For clarity, Officers do not contend, as a matter of certainty, that the proposals will result
in unacceptable noise impacts on the amenity value and enjoyment of Duchess Woods.
However, the lack of certainty on this matter on the level of any noise which would be
audible from the woodland is a further material consideration in concluding that the current
submissions do not adequately address the issue of noise, and potential amenity impacts
to the satisfaction of Officers. 
4.6. Had officers been minded to approve this development, a revised noise survey, accurate
in respect of the proposed equipment and its noise and vibration generating characteristic
over a full 24hr operational period would have been required. Given the fundamental
importance of these matters to the proposed location of the BESS being acceptable,
Officers do not consider the use of a suspensive condition would adequately address these
matters in this particular case. 
4.7. For the reasons set out above it is considered that the proposal fail to provide sufficient
detail in respect of potential noise impacts upon surrounding sensitive receptors and land
contrary to the objectives of LDP 2 Policy 14. 
5. Network, Parking and Associated Transport Matters. 
5.1. The applicants confirm by submission that they would utilise the existing Ardencaple Farm
access track off Paterson Drive, and thereafter would propose to enter the site from the
north via a new private access track to the BESS. The management of access during the
construction phase set out in the submitted Construction Traffic Management Plan (CTMP).
The lack of adequate and safe access for both construction, operational and emergency
service access is a concern which a considerable number of objectors have raised. The
Page 125

Page 126

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Area Roads Engineer has recommended refusal of the application over inadequate and
substandard access arrangements being submitted. In his response dated 07.08.24 he
comments that, 
On review, having attempted to access the site in a vehicle, it has become apparent that
the route does not offer the necessary intervisibility between vehicles and pedestrians,
nor the available width for vehicles access or pedestrian ‘step-off’ due to the extents of
vegetation growth. 
Additionally, access to the proposed site from the existing access route/ road covers a
significant change in elevation. Stated within the submission, the access road will be
installed at a ratio of 1:5 (20%), Argyll and Bute design guidance states that access roads
must be installed no greater than 1:20 (5%). Any solutions to lessen the gradient would
require significantly more area than that which has been identified within the applicant’s
red line boundary. 
In conclusion, the combined access issues and access gradient issue require
improvement to reach the minimum design guidance set out with Argyll and Bute standard
details and design guidance. As the commensurate improvements to achieve these
standards appears to be out with the applicant’s gift, Roads refuse the proposed on the
grounds of road safety. 
5.2. Members should note that discussions were entered into with the applicant to seek to
provide adequate intervisibility and passing places and revised proposals were provided by
the applicant to seek to address access to the site. However, the applicant has failed to
provide reassurance to the Area Roads Engineer that the proposals could be delivered due
to constraints over the land they have control of and given the extent of necessary
improvements. 
5.3. Further consideration of the proposals also raised concerns in relation to the gradients
proposed for the private access road to the site and the internal access road within the site
in respect of not meeting necessary roads standards for emergency vehicle access.
Officers consider that the ability to provide safe and acceptable access to the site for
emergency service vehicles is a fundamental matter to the suitability of the site for a BESS
development. This is therefore considered to be a matter which requires to be resolved at
application submission to the satisfaction of the Area Roads Engineer and is not an
appropriate matter for the use of a suspensive condition. 
5.4. In the consultation response dated 27.03.24 from the Scottish Fire and Rescue Service
(SFRS) they have clarified a number of access and other technical requirements for BESS
proposals. Of most relevant to access requirements is the following extract: 
Suitable facilities for safely accessing and egressing the site should be provided. Designs
should be developed in close liaison with the local FRS as specific requirements may
apply due to variations in vehicles and equipment. 
This should include: 
At least 2 separate access points to the site to account for opposite wind
conditions/direction. 
Roads/hard standing capable of accommodating fire service vehicles in all weather
conditions. As such there should be no extremes of grade. 
A perimeter road or roads with passing places suitable for fire service vehicles. 
Page 126

Page 127

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
5.5. It is considered that the failure of the proposal to meet these SFRS requirements is a further
material consideration, reinforcing the objection of the Area Roads Engineer in respect of
the proposed site and access arrangement roads being substandard to ensure acceptable
emergency service vehicle access to site. This again suggests that insufficient weight has
been given to these constraints within what was in officers opinion a flawed site search
approach as has been previously referenced at Section 1 of this report. 
5.6. Given the above the proposals are considered to be contrary to requirements of LDP 2
Policies 35, 37 and 39. 
6. Other Key Policy Matters 
6.1 Flooding and Drainage 
The Councils Flooding advisor has raised no objection to the proposals and has
commented that: 
The site lies outwith the indicative limits of fluvial and coastal flooding, as per the SEPA
Future Flood Maps. A small, localised region of surface water flooding overlaps with the
southern boundary of the site, however, depths are recorded to be less than 30cm, and
extends over a small surface area. The proposed development is outwith the surface water
flood extent. The small watercourses to the west and east of the site have catchment areas
of less than 3km2 and hence haven’t been accounted for in the SEPA Fluvial flood map.
Flood risk from these watercourses has not been quantified in the Flood Risk and Hydrology
/ Drainage Impact Assessment. However, as the site plans show a stand-off distance
between the watercourse and the proposed development and the site is outside of the
indicative surface water extent, the proposals are considered to be acceptable regarding
flood risk 
A Drainage Impact Assessment includes a drainage plan and drainage calculations for the
site, and the following comments are made: 
• The Drainage layout shows that surface water run-off will be routed to storm cells and
attenuated within the site before discharge to the small watercourse to the west of the
site. Flow exceedance routes are included in the drainage plan.
• The Drainage calculations show that the drainage capacity of the storm cell system (345
m3) will accommodate rainfall events up to and including the 200-year event plus an
allowance for climate change. This is acceptable. 
It is noted that the proposals have water tank provision on site as part of a proposed fire
suppression system and that further technical requirements in terms of water suppression
requirements have been provided in the consultation response from the SFRS. Should the
need arise for water suppression of a fire on the site, the water will be required to be
retained on the site and not allowed to discharge in a similar manner to surface water as
there will be contaminants in the water associated with the materials the batteries are made
of. 
Officers are of the opinion that had the recommendation been to approve the current
proposal, a condition requiring a fire safety and site drainage and pollution containment
plan would have been required to ensure both the capability of the system and the ability
to meet the requirements of the SFRS. It would also be essential to ensure any external
fire service related water used in combination with on-site water tank use, would not
discharge from the site on a worst case scenario given the North to South slope, and
proximity of the Local Nature Conservation Site. 
Page 127

Page 128

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
It not considered that these concerns would in themselves form a reason to refuse the
application and a suspensive condition requiring further submissions on these matters
could have been imposed had the recommendation been to approve the proposals. 
6.2 Biodiversity and Natural Environment 
The Council’s Biodiversity Officer has evaluated the application submissions, and in particular
the details contained within submitted Landscape Mitigation plan. In her response she clarifies
that: 
Comments from the Ecology Report:
I agree with the proposed mitigation measures:
• Installation of noise fence during construction phase
• Works to be completed outwith the breeding bird season
• Pre-works check for reptiles, amphibians, water vole, breeding birds
• Good practice carried out on site
• Delivery of ToolBox Talk prior to works 
I also agree with the recommendations for general biodiversity enhancement. 
The Biodiversity Officer has had regard to the fact that it is likely that bats from the surrounding
woodland will overfly the site when hunting and has therefore referenced the need for lighting
to be properly controlled in any grant of planning permission in accordance with good practice
(reference is made to the advice within the Bat Conservation Trust Guidelines on lighting and
Pages 29-30 as a useful reference). 
In respect of any necessary future information on submissions which should be conditioned
had an approval been proposed. She clarifies: 
Recommendations:
• I would suggest a bat survey be conducted prior to works commencing due
to the potential for ongoing disturbance to bats from potential light and noise
pollution. There is moderate value habitat present for bat commuting and
foraging. Limitations of the survey included trees to the east of the site that
were only able to be surveyed for potential bat roosting features from the
ground level due to the canopy layer of leaves during the survey. 
• A programme of tree / flower planting should be included to show species,
location, timings and methods of implementation, and on-going monitoring and
maintenance. This will ensure all new vegetation is protected until such a time it
becomes established and ensure biodiversity enhancement. 
Officers accept and acknowledge that the enhanced landscaping proposals which have been
submitted, on balance of probability, achieve biodiversity net gain given the current low
biodiversity/habitat value of the site. Officers also accept that the planting proposals would in
the longer term assist in both biodiversity enhancement objectives and assist in reducing the
visual impact of the proposals on the greenbelt at this point. It is considered that, had it been
officer recommendation to approve the current proposal, a suspensive condition requiring
Page 128

Page 129

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
further submissions to demonstrate biodiversity net gain has been achieved could adequately
address these matters in this particular instance. 
Given the above, it is considered that the proposals can be considered in general adherence
NPF Policy 3 and LDP 2 Policy 73 objectives. 
6.3 NPF Policy 11 (c) and 25 and LDP 2 Policy 11 Economic Benefits 
The policy framework against which proposals for energy development proposals must be
evaluated also includes the following policy matters: 
NPF 4 Policy 11(c) states that: 
“Development proposals will only be supported where they maximise net economic
impact, including local and community socio-economic benefits such as employment,
associated business and supply chain opportunities.” 
Policy 25(a) of the NPF4 states: 
“Development proposals which contribute to local or regional community wealth
building strategies and are consistent with local economic priorities will be supported.
This could include for example improving community resilience and reducing
inequalities; increasing spending within communities; ensuring the use of local supply
chains and services; local job creation; supporting community led proposals,
including creation of new local firms and enabling community led ownership of
buildings and assets.” 
LDP 2 Policy 11 requires energy related proposals to be assessed against a number of criteria
, including: 
Net economic impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities.” 
The applicant has submitted an Economic Benefits Statement as Appendix M to the proposal.
This clarifies that: 
• Battery development projects create employment opportunities particularly during
construction phase. Wherever possible, the Applicant will seek to utilise local
employment for the civil engineering aspect. Furthermore, these projects can
stimulate local economies and generate revenue for the community, both through
direct employment and indirect benefits to local businesses and services.
Furthermore, they can attract investment and foster innovation in Scotland's growing
green energy sector. 
• Opportunities for indirect benefits include utilising local labourer workforce
(~£500/week), and using locally owned accommodation to house external workforce
(i.e. 4 nights a week at ~£100 per night). In addition, sustenance costs for workforces
spent in local shops (~£20/day) 
• It is anticipated there would be an average of 10 labourers per site at any given time,
with project build time of 12 months = ~£240,000 contribution to local economy.
20 Battery storage facilities require enhanced grid reliability and resilience, reducing the
risk of local power outages. This would include the introduction of fibre
communication networks and replacing outdated or overtaxed electrical infrastructure
Page 129

Page 130

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
at the substation. As with all infrastructure networks, these would be owned by the
operator and would therefore be available to local businesses and residents. In times
of natural disasters, extreme weather events, or unforeseen grid disturbances,
battery storage facilities can provide a critical, temporary, source of backup power,
supporting essential services, hospitals, and emergency response units. 
• During the initial project phase, a project of this kind can bring in excess of £1,000,000
of direct investment into a local area by using local companies to undertake the civil
engineering element of the project. At the point of tender, the Applicant will engage
with appropriate local businesses invite them to submit tenders for the civil
engineering element of the project. Also, there will be additional local benefits
through hiring of equipment and sourcing incidental materials. The installation and
commissioning process is likely to be undertaken by the equipment suppliers and
involves highly specialised, qualified and experienced personnel. It is acknowledged
that this is unlikely to be from local companies. However, secondary benefits of the
technical installation and commissioning process (likely to be for a 12 month period)
would be for local businesses to benefit by providing accommodation and hospitality
services during the construction period. 
• Longer term, battery energy storage projects create high skill employment
opportunities with transferrable skills. The energy sector is the largest direct employer
in Scotland outside of the public sector. (source: The Economic Impact of Scotland's
Renewable Energy Sector). The Applicant would explore opportunities to upskill local
tradesmen to undertake this work. 
• The project will be subject to a high band of business rates, contributing an estimated
£225,000 each year to the local authority to fund public services for the full 25-30
year project life. 
Officers consider that the matters set out above are satisfactory to address the policy
requirements of this particular proposal, although further details on the mechanisms to deliver
the desired outcomes would be required to provide additional reassurance. Officers are
content that such matters could be resolved through the use of a suspensive condition
requiring further details on how these commitments would be adhered to and delivered (such
as commitment to hold open days for suppliers and to explore training or education
opportunities associated with the proposals) 
6.4 Restoration Bond and Site Restoration Plan (to include waste management and
disposal plan for any potentially contaminating materials) 
Had it been the recommendation of officers to approve this application, a suspensive condition
requiring a site decommissioning Plan and Waste Management Plan would have been
required This would also require the provision of an appropriate financial mechanism (the sum
and indexing mechanism to be independently verified), to ensure any costs associated with
site restoration were adequately covered in a similar manner to a minerals restoration
requirement. The need for a waste management element reflects the know needs associated
with the proper removal and disposal of BESS units. In accordance with established practice
the use of a suspensive condition could, in the opinion of Officers, adequately address these
matters. 
6.5 Workers Housing Strategy 
Discussions with relevant policy officers has confirmed that a workers housing strategy
condition would not be required for development sites within daily commuting distance from
Page 130

Page 131

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
the central belt area.  Therefore, in this particular instance, no suspensive condition on this
matter would be imposed by officers had the recommendation been to approve the
development. 
6.6 Cultural Heritage 
The applicants have submitted a heritage statement dated October 2023 in respect of  these
matters as part of the application submission package. Designated Heritage assets in the
surrounding area are identified at Figure 1. The Conservation Area Boundary is identified at
Figure 2 and non-designated assets are identified at Figure 3. The report concludes at Section
5 that: 
a range of heritage assets in accordance with best practice as provided by Scottish Natural
Heritage Good Practice Advice. It has shown that the Proposed Development Site would not
impact on any designated or undesignated heritage assets and therefore accords with NPF4
and the Local Plan. 
Officers are in agreement with this conclusion and the proposals are considered to be in
accordance with the requirements of NPF 4 Policy 7 and LDP 2 Policy 15. 
6.7 Network Rail Suspensive Conditions 
Officers note that Network Rail in their consultation response have also confirmed the need
for the imposition of suspensive conditions on any grant of planning permission to safeguard
their interests. 
Officers are uncertain as to whether all the Network Rail conditional requirements could be
satisfactorily addressed by the applicants.  However, as the Officer recommendation is to
refuse the application, the need to examine these matters in more detail at this stage is not
required. 
Page 131

Page 132

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Appendix B Representations in relation to 23/02472/PP 
Objection  
Adam McLean 3 Paterson Drive Helensburgh Argyll And Bute G84 9QY 
Aimee Woolfries No Address Given    
Albert Barclay Carbeth House Torwoodhill Road Rhu Helensburgh Argyll And Bute 
Alistair Stewart 61 Macleod Drive Helensburgh Argyll And Bute G84 9PS 
Allan Naismith 44 Queen Street Helensburgh Argyll And Bute G84 9PT 
Antonio Lopez Jordan 10 Macleod Crescent Helensburgh Argyll And Bute G84 9QX 
Audrey Baird No Address Given    
Brian McCutcheon     
Caroline Strugnell 22 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Cathryn Silverthorne 3 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Catriona Davies Suite A3 Stirling Agricultural Centre Stirling FK9 4RN 
Craig Fyffe 18 Paterson Drive Helensburgh Argyll And Bute G84 9QY 
David Anderson Ashton Rhu Road Higher Helensburgh Argyll And Bute 
David Cantello 35 Redclyffe Gardens Helensburgh Argyll And Bute G84 9JJ 
David Fox 49 Charlotte Street Helensburgh G84 7SE  
David Lewin 36 Queen Street Helensburgh Argyll And Bute G84 9PU 
David McNaught 38 MacLeod Drive Helensburgh  G84 9QU  
Dawn Archard No Address Given    
Fiona Baker Hillcroft Station Road Rhu Helensburgh 
Fiona Young Edward Drive Helensburgh   
Helen Ratcliffe 65 Macleod Drive G849PS   
Hilary Stuart Dunaivon Armadale Road Rhu Helensburgh Argyll And Bute 
Iain MacLaren Twiga Glenoran Road Helensburgh Argyll And Bute 
Jackie Baillie MSP Constituency Office 11 Castle Street Dumbarton G82 1QS 
James Scullion No Address Given    
James Silverthorne 3 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Jean McFarlane 38 MacLeod Drive Helensburgh G84 9QU  
Joe McIntyre 46 Macleod Drive Helensburgh Argyll And Bute G84 9QU 
John Allwood 10 Macleod Drive Helensburgh Argyll And Bute G84 9QS 
John Thompson Full Address Not Given    
Jonathan Sutton No Address Given    
Keith And Elaine Ferguson     
Lewis Martin 7 Lower Sutherland Crescent Helensburgh Argyll And Bute G84 9PG 
Lois Nicolson     
Louise Syme Willow Bank Garelochhead Helensburgh Argyll And Bute 
Lucy Scullion Cherryhill Stables Helensburgh Argyll And Bute G84 9QG 
Lynn Harper 67 Macleod Drive Helensburgh Argyll And Bute G84 9PS 
Martin Grafton 17 Queens Point Shandon Helensburgh Argyll And Bute 
Mary Kingshott 46 Queen Street Helensburgh Argyll And Bute G84 9PT 
Michaela Mather 9 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Michelle McCutcheon No Address Provided    
Morag Young 73A West King Street Helensburgh Argyll And Bute G84 8EE 
Natasha Watkiss 20 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Nicky Brownrigg Ardentigh Glenoran Road Helensburgh Argyll And Bute 
Noble Macpherson 31 Kennedy Drive Helensburgh Helensburgh Argyll And Bute 
Nora Morocza Flat 2/1 27 John Street Helensburgh Argyll And Bute 
Paula McIntosh 66A Colquhoun Street Helensburgh Argyll And Bute G84 9JP 
Penny Ward 25 Laggary Road Rhu Helensburgh Argyll And Bute 
Peter Davies 66 James Street Helensburgh Argyll And Bute G84 9LF 
Rachel Black 26 Ardencaple Drive Helensburgh Argyll And Bute G84 8PS 
Page 132

Page 133

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Rob Stuart Dunaivon Armadale Road Rhu G84 8LG 
Roger And Ruth Scullion     
Roger Scullion Cherrytree Stables Paterson Drive Helensburgh  
Ross Mather 9 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Sally Butt Upper Flat 2A West Lennox Drive Helensburgh Argyll And Bute 
Seonag Bates Redwood Glenarn Road Rhu Helensburgh 
Suzanne Hamilton No Address Given    
Terence Brownrigg No Address Given    
Thomas Carruthers 4 Paterson Drive Helensburgh Argyll And Bute G84 9QY 
Vivien Monteith 5 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Xanne Janssen 22 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Xanne Janssen 22 Duchess Drive Helensburgh Argyll And Bute G84 9PR 
Nigel Millar     
Support  
James Rae 104 West King Street Helensburgh Argyll And Bute G84 8EQ 
Representation  
Jackie Baillie Constituency Office 11 Castle Street Dumbarton G82 1QS 
Martin Grafton No Address Given    
Friends Of Duchess Wood     
Page 133

Page 134

This page is intentionally left blank

Page 135

Page 135

Page 136

This page is intentionally left blank

Page 137

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 24/00260/PP
Planning Hierarchy: National
Applicant: Scottish Hydro Electric Transmission Plc
Proposal: Section 42 application for the removal of condition 11 relative
to planning permission reference 22/00782/PP (To construct
and operate a 132/275 kilovolt (kV) GIS substation and
associated infrastructure that will connect the existing 132 kV
overhead line (OHL) from Taynuilt to Inveraray to a proposed
275 kV OHL to Dalmally. The works will comprise cut and fill
to tie the platform into the existing ground level, landscaping,
Sustainable Drainage Systems (SuDS) basins, new
permanent access and upgrades to existing tracks) 
Site Address:  Land Approximately 2.5 Km Southwest of Cladich, 
Argyll And Bute    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Deletion of condition 11 relative to planning permission reference
22/00782/PP – to remove the requirement to raise the finished ground
floor levels of all buildings to 0.3 metre above the surrounding ground
level.  
• Construction of substation platform (190m x 225m) to accommodate Gas
Insulated Switchgear (GIS) 
• Erection of buildings, installation of electrical plant and erection of
perimeter security fencing 
• Widening of existing forestry tracks (1,895m in length) and upgrading of
existing culverted watercourse crossing the River Aray 
• Construction of 323m of new access track, comprising 108m connecting
the existing forest track to the substation site and 215m of access track
continuing around the substation site on the south east and north east
aspects 
• Landscape planting 
• SUDs, comprising four basins to the east of the substation platform 
Page 137 Agenda Item 7

Page 138

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
• Peat restoration on-site by way of dressing of substation platform slopes
and access tracks, as well as ditches and other cut areas 
(ii) Other specified operations 
• Temporary site laydown area approximately 200m south east of the
substation site  
• 3.55ha of management felling to the northwest of substation site which
forms part of long-term forest plan for the area 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission be granted, in accordance with Section
42 of the Town and Country Planning (Scotland) Act 1997, subject to the conditions
and reasons detailed in this report.   
(C) CONSULTATIONS:   
Scottish Environmental Protection Agency (SEPA) (16th February 2024) – have
no adverse comments or objections to the deletion of the condition, stating in their
response that they did not request that the condition to require the applicant to raise
the finished floor levels be placed on the original application. 
NatureScot (15th February 2024) – confirm that the proposals continue to fall outwith
their consultation threshold and as such have no specific comments. 
Historic Environment Scotland (22nd February 2024) – have no adverse
comments or objections to the proposals. 
Transport Scotland – no response to the consultation request. 
Scottish Rights of Way and Access Society – no response to the consultation
request. 
West of Scotland Archaeological Service (WOSAS) – no response to the
consultation request. 
Glenorchy and Innishail Community Council – no response to the consultation
request. 
ARGYLL AND BUTE COUNCIL INTERNAL CONSULTATION RESPONSES 
Environmental Health (9th April 2024) – state that they have no remit regarding
condition 11. 
Flood Risk Management Advisor (7th March 2024) – refer to their consultation
response on the original application, dated 8th September 2022, in which they stated
“The supplied elevations do not list FFLs to mAOD, though they do appear to be
slightly elevated above ground level. Given the pluvial flood risk to the site it is
recommended that FFLs be elevated 0.3 metre above surrounding ground level, if
practicable”. They further note that no additional info on FFL’s has been submitted
Page 138

Page 139

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
with the current application, however state that as the raising of the FFLs by 0.3
metre was only a recommendation on the original application, have no objections to
the removal/deletion of the actual condition. 
Local Biodiversity Officer – no response to the consultation request. 
Area Roads Oban – no response to the consultation request. 
Core Paths Officer – no response to the consultation request.     
The above represents a summary of the issues raised.  Full details of the
consultation responses are available to view via the Public Access section of the
Council’s website.   
(D) HISTORY:   
Specific to the site: 
21/01230/PAN - Proposal of Application Notice for the erection of electricity
substation comprising platform area, control building, associated plant and
infrastructure, ancillary facilities, access track(s), laydown area(s) and landscape
works. Land East of Creag Dhubh, Cladich, Argyll and Bute. Opinion Issued 18
August 2021. 
21/02348/SCREEN - Screening Opinion for the installation of 132/275kV substation
and associated works. Creag Dhubh Substation. Screening opinion issued on 16
March 2022. 
22/00782/PP – The original planning application for the proposed GIS Substation
and associated infrastructure on the site. Granted conditional planning permission
by the Council on 16 February 2023.   
Of relevance: 
21/00286/SCOPE - Scoping request for proposed Section 37 application for the
proposed Creag Dhubh to Dalmally 275 kV connection. Scoping opinion issued on
30 June 2021. 
22/02305/S37 - Section 37 Application for Creag Dhubh to Inveraray 275kV
Overhead Line. Creag Dhubh To Inveraray Overhead Line, Inveraray Estate
Woodland, Inveraray, Argyll and Bute. Granted conditional approval by the Scottish
Government Energy Consent Unit on the 21 August 2024.   
(E)      PUBLICITY:   
MREG20 – Regulation 20 Major Application Advert, Expired 21 March 2024 
(F) REPRESENTATIONS:   
(i) Representations received: None received. 
Page 139

Page 140

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No  
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No  
(iii) A Design or Design/Access statement:    ☐Yes ☒No  
(iv) Sustainability Checklists (with reference to the requirements of LDP2
Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☐Yes ☒No
☐Yes ☒No  
(v) A report on the impact of the proposed
development eg. Retail impact, transport impact,
noise impact, flood risk, drainage impact etc:  
☐Yes ☒No   
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No    
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy
Page 140

Page 141

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy 
Policy 30 – The Sustainable Growth of Renewables 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 39 – Construction Standards for Private Accesses 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Page 141

Page 142

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Planning Advice Notes & Web-based Renewables Guidance 
• Renewable energy and climate change framework 
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017) and position Update dated 16.3.21 
• Scotland’s Draft Energy Strategy and Just Transition Plan: Ministerial statement
(Dated 10.1.23) 
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• Views of statutory and other consultees,
• Planning history of the site 
• Legitimate public concern or support expressed on relevant planning matters 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No    
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
The opportunity to attend a pre-determination hearing is required to be offered in     
relation to applications for planning permission for major developments which are
significant departures from the development plan, and for all national developments.
Their purpose is to allow the views of applicants and those who have made
representations to be heard before a planning decision is taken. The Planning
Authority has discretion over how hearings will operate in its area. The applicant and
consultees have confirmed that they do not wish to be heard, and therefore a
Hearing will not be required.   
(O)(i) Key Constraints/Designations Affected by the Development: 
• Peat 
• Forestry Removal 
(O)(ii) Soils 
Agricultural Land Classification:  Class 6.3 – Rough Grazing
Peatland/Carbon Rich Soils
Classification:
☐Class 1 
☐Class 2 
Page 142

Page 143

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
☐Class 3 
☒N/A 
Class 5 indicated on Council Maps. 
Peat Depth Classification:   N/A      
Does the development relate to croft
land? 
☐Yes ☒No 
Would the development restrict access
to croft or better quality agricultural
land? 
☐Yes ☐No ☒N/A 
Would the development result in
fragmentation of croft / better quality
agricultural land? 
☐Yes ☐No ☒N/A 
(O)(iii) Woodland 
Will the proposal result in loss of
trees/woodland? 
(If yes, detail in summary assessment) 
Yes  - the development has commenced and the
trees have already been removed. 
Does the proposal include any
replacement or compensatory planting? 
☒Yes 
☒No details to be secured by condition 
☐N/A 
(O)(iv) Land Status / LDP Settlement Strategy 
Status of Land within the Application 
(tick all relevant boxes) 
☐Brownfield 
☐Brownfield Reclaimed by Nature 
☒Greenfield 
ABC LDP2 Settlement Strategy 
(tick all relevant boxes) 
☐Settlement Area 
☒Countryside Area 
☐Remote Countryside Area 
☐Helensburgh & Lomond Greenbelt 
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Assessment and summary of determining issues and material considerations                                     
A Section 42 application is an application for a new planning permission for a
development, but with different conditions from those attached to a previous
permission for that same development. In determining such an application, the
Planning Authority can only consider the changes to the conditions on the previous
permission. The principle of development is not under consideration and the original
permission remains live. 
(i) Principle of Development
Planning Permission (ref. 22/00728/PP), to construct and operate a 132/275 kilovolt
(kV) GIS electrical substation and associated infrastructure, with works comprising
of cut and fill to tie the compound platform into the existing ground level, landscaping,
Page 143

Page 144

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Sustainable Drainage Systems (SuDS) basins, new permanent access and
upgrades to existing tracks was originally granted on 16th February 2023. It should
be noted that works have now commenced on site, and these works are progressing
in accordance with the original approval.   
(ii) Proposed Development 
The current application has been made under Section 42 of the Town and Country
Planning (Scotland) Act 1997, as the applicant wishes to delete a planning condition
(Condition 11) attached to the original consent, 22/00728/PP, requiring that the
finished floor levels of all the previously approved buildings on the site are elevated
0.3 metre above the surrounding ground levels. 
Condition 11 of 22/00728/PP states:           
“Notwithstanding the provisions of condition 1, the finished ground floor levels of the
buildings of the development shall be elevated to 0.3 metre above surrounding
ground level, unless otherwise agreed in writing by the Planning Authority.” 
This requirement was added as a planning condition to the original approval following
a consultation response received from the Flood Risk Management Advisor (JBA
Consulting, dated 8th September 2022), in which they stated “The supplied
elevations do not list FFLs to mAOD, though they do appear to be slightly elevated
above ground level. Given the pluvial flood risk to the site it is recommended that
FFLs be elevated 0.3 metre above surrounding ground level, if practicable”. As
stated above, following consultation on the current application, they further note that
no additional info on FFL’s has been submitted with the current application, however
state that as the raising of the FFLs by 0.3 metre was only a recommendation on the
original application, have no objections to the removal/deletion of the actual
condition. Prior to submitting the current application, the applicant contacted the
flooding consultee direct to discuss the reasoning for the requirement for the 0.3
metre raising of the FFL. In response, the consultee stated that the 0.3 metre
increase to FFLs was “more a note to the applicant that it may be a mitigation
measure they wish to consider, however did not intend for it to be added as a formal
condition.” In response to this statement, the applicant advised that their intention
was to follow their standard specifications for such projects, with the substation
platform designed and constructed to be free draining, set 0.15 metre above FFL
and for an up to a 1 in 1000 year rainfall event. In addition, raising all FFLs to 0.3
metre above ground levels would add further complexities to the construction of the
project, including additional ramps and hardstanding areas. 
In view of the above, the flooding consultee and the Council concur that it is not
practical for the applicant to incorporate raising the FFLs for all buildings proposed
within the site by 0.3 metres, noting the applicant’s intention to raise all FFLs by 0.15
metre, and therefore it is considered acceptable to delete condition 11. 
As physical works have now commenced on site the Council considers that it is also
necessary to reword a number of pre start and enduring planning conditions attached
to the original consent for the project, under ref: 22/00782/PP, conditions that
required to be discharged or part discharged prior to works commencing on site. The
relevant conditions affected that require to be reworded are conditions 2 (CEMP), 3
(CTMP), 4 (WOSAS WSI), 5 (Construction Worker’s Housing Strategy), 6 (Private
water supply), 7 (CNMP), 8 (PMP), 9 (CPP and LTFMP) and 10 (Vehicle wheel
cleansing facilities). The remaining, enduring planning conditions attached to the
original consent, conditions 12 to 17, are proposed to be carried over in their existing
worded form. 
Page 144

Page 145

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL            
If successful, the effect of a Section 42 application to modify or delete a planning
condition or conditions is to grant a further planning permission for the whole
development but with the amended condition or conditions replacing those that were
previously issued, or (if appropriate) with conditions removed if required.  All other
conditions, if relevant, are also required to be attached to any new planning
permission.  If the proposed changes to the condition or conditions are deemed
unacceptable, then Section 42 of the Act requires the application to be refused.  Any
refusal of an application under Section 42 of the Act does not have any effect on the
original planning permission which remains intact.     
Following a detailed assessment and noting the responses from the consultees, the
proposal is considered to be consistent with policies in both the National Planning
Framework 4 (NPF4) and the Argyll and Bute Local Development Plan 2. Therefore,
it is recommended that the application to delete condition 11 attached to planning
permission 22/00782/PP is granted, which effectively renews that planning
permission for a further three years.   
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
All relevant matters have been taken into account when assessing this further
application. It is considered that the proposal accords with the principles and policies
contained within both the adopted National Planning Framework 4 and the adopted
Argyll and Bute Local Development Plan 2. The Section 42 application to delete the
planning condition is considered acceptable, subject to the retention and
amendment of the remaining planning conditions in terms of all other applicable
material considerations. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan   
Not applicable 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Stuart Ramsay Date: 24.09.2024 
Reviewing Officer: Sandra Davies Date: 07.10.2024 
Fergus Murray
Head of Development & Economic Growth  
Page 145

Page 146

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/00260/PP 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 09/02/2024, supporting information, including the
Environmental Appraisal for application 22/00782/PP (April 2022), and the approved
drawings listed in the table below, unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of
the Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location
Plan
R170_3673_Fig1_1_RedlineBoundarySite_C C 12/02/24
Proposed
A819 Site
Access
Design
Location
Plan
LT29_CRDH_0804_0010 B 12/02/24
Location
of septic
tank,
borehole
water
supply
and
SUDS
R170_3673_Fig1_SepticTank_BHWS_SUDS_D D 12/02/24 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.   
2.  The development shall proceed in accordance with the approved Finalised
Construction Environmental Management Document (CEMD) for the site, as approved
under application 22/00782/PP, unless otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure protection of surrounding environmental interests and general
amenity.  
3.  The development shall be implemented and proceed in accordance with the approved
Construction Traffic Management Plan (CTMP) and Phased Delivery Plan, as
approved under application 22/00782/PP. 
Page 146

Page 147

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
4. 
5. 
6. 
7. 
8. 
9. 
Reason: To minimise interference with the safety and free flow of the traffic on the
trunk road, to ensure the safety of pedestrians and cycle users using the trunk road
and adjacent facilities and to be consistent with current guidance and best practice. 
The development shall be implemented in accordance with the duly approved details
of the proposed archaeological works contained with the approved written scheme of
investigation, with the suitably qualified person being afforded access at all reasonable
times during ground disturbance works. 
Reason: In order to protect archaeological resources. 
Prior to the end of February 2025, further details of a continuing strategy for housing
incoming construction workers shall be submitted to and approved in writing by the
Planning Authority. Thereafter the development shall continue to be carried out in
accordance with the further approved details submitted and approved. 
Reason: In order to ensure that any potential adverse impacts on the functioning of
the local housing market and tourist accommodation to the detriment of the interests
of the local community are identified and mitigated in accordance with the
requirements of NPF4, and in particular Policy 11C and Policy 25 Objectives. 
The development shall not be brought into use or occupied until the required private
water supply system has been installed in accordance with the agreed specification,
as approved under application 22/00782/PP, and is operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
The development shall progress in accordance with the approved Construction Noise
Management Plan (CNMP), as approved under application 22/00782/PP, with all
approved mitigation measures to be in place prior to the commencement of
development, or as otherwise agreed in writing by the Planning Authority. 
Reason: In the interest of safeguarding residential amenity. 
The development shall progress in accordance with the approved Peat Management
Plan (PMP), as approved under application 22/00782/PP. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reuse
and management of peat. 
Prior to the energising of the development hereby approved, a detailed Compensatory
Planting Plan (CPP) and Long Term Forestry Management Plan (LTFMP) shall be
submitted to and approved in writing by the Planning Authority, in consultation with
Scottish Forestry. The approved CPP and LTFMP shall be implemented in full and in
accordance with the approved timing, unless otherwise agreed in writing by the
Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal.
Page 147

Page 148

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
10. 
11. 
12. 
13. 
14. 
15. 
16.
The development shall not become operational until the vehicle wheel cleansing
facilities, as approved under application 22/00782/PP, have been installed and
brought into operation on the site. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
Watercourse crossings hereby permitted shall be designed to at least the capacity of
the existing channel, and to the 1 in 200 years plus climate change flow, and an
allowance for freeboard, unless otherwise agreed in writing by the Planning Authority.
This includes the replacement of the existing River Array watercourse crossing with a
new oversized box culvert, or bottomless traditional style bridge to accommodate the
1 in 200 year flood event without constriction. 
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk. 
The development shall not include for the provision of walls, fences or hedges within
2.0 metres of the carriageway of the public road, and any gates shall open inwards,
away from the public road. 
Reason: In the interest of road safety. 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Operational Services Drawing No SD08/001a; and visibility splays
of 160 metres x 2.4 metres shall be cleared of all obstructions such that nothing shall
disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6
metres above the public road carriageway at point Y. The final wearing surface on the
access shall be completed prior to the development first being brought into use and
the visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of
the lighting units to be installed shall be specified, and any duly approved lighting shall
be installed in a manner which minimises illumination and glare outwith the boundary
of the application site. The site shall not be illuminated other than in the event of staff
being present on site. 
Reason: In order to avoid unnecessary visual intrusion, in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
All vehicles transporting construction material to and from the proposed development
shall be sheeted. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
Any blasting for the development hereby permitted shall not exceed vibration levels at
the nearest Noise Sensitive Receptors (NSR) of the guideline limits presented in BS
7385-2: 19937 and BS 6472-2: 20088. 
Reason: In the interests of protecting amenity of neighbouring land use occupiers. 
Page 148

Page 149

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
ADDITIONAL NOTES TO APPLICANT 
• Guidance on the submission of a request for a NMA is available online. Guidance Note
(argyll-bute.gov.uk) 
• Regard should be had to the advice to the applicant supplied by SEPA in their
consultation responses, copies of which can be viewed on the planning pages of the
Council's Website. Please note that in respect of condition 2 above SEPA advises that
the finalised peat management and restoration proposals should adhere to their advice
as included within their part 4 of their consultation comments. 
• Regulatory requirements for private water supplies should be discussed with the
Council's Environmental Health Officers in the first instance. 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from
the Council's Roads Engineers prior to the formation/alteration of a junction with the
public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
Page 149

Page 150

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/00260/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1.  Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission
under Section 42 of the Town and Country Planning (Scotland) Act 1997 to delete a
planning condition (Condition 11) attached to the original consent for an electrical
substation, requiring that the finished floor levels of all the previously approved
buildings on the site are elevated 0.3 metre above the surrounding ground levels. 
1.2 The proposed development is located 2.5km south west of Cladich on the eastern
slopes of Cruach na Gearrchoise within the River Aray catchment. The site is located
within a large commercial conifer plantation which is in the process of being harvested.
The surrounding land is a mix of regenerating moorland, conifers and a small number
of large trees. The application site has been fully harvested and now comprises of a
clear felled area of ground, with some mature trees retained along the western
boundary. The site selection process for the substation was detailed in the
Environmental Appraisal (Section 4.2: Site Selection) submitted with the original
planning application, 22/00728/PP.  This explained that the aim of the process was to
identify a proposed site which is technically feasible and economically efficient, and
which causes the least disturbance to the environment; and to those living in it, visiting
it or using it for recreation. Of the eight sites originally considered, two were selected
as preferred sites, with subsequent investigations identifying the presence of
significant volumes of environmentally sensitive and technically challenging peatland
at both preferred sites. This resulted in further survey work and micro-siting to
determine the site with the least amount of peat disturbance, which in turn became the
land occupied by the current application site. 
1.3 The proposal itself comprises the creation of a substation platform of approximately
4.2ha to accommodate the Gas Insulated Switchgear (GIS) for the proposed
substation. This would be created using cut and fill to create a level platform at 208m
AOD, cutting some land within the site area down from 220m AOD. One side of the
substation will comprise a 275kV double busbar Gas Insulated Switchgear (GIS),
housed in the larger of two main buildings (approximately 22m x 14m x 20m) and will
include connection of two 275kV overhead line bays. The other side will consist of a
132kV double busbar GIS, housed in the smaller of the two buildings (approximately
22m x 14m x 20m) and will include four 132kV overhead line bays and a possible grid
transformer bay. Both sets of GIS will have two bays to connect to the centrally located
super grid transformers which sit between the two buildings. The 275/132kV super grid
transformers (SGT) will be rated at 480 MVA. The substation includes a single storey
building to house the site services and control equipment. A private bore hole is
proposed to provide a private water supply to the development with the requirement
for toilet facilities, a shower and sink for the maintenance staff as the converter station
will not be permanently manned. 
2.  Settlement Strategy 
2.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires planning
applications to be determined in accordance with the development plan unless material
planning considerations indicate otherwise. The principle of development has been
Page 150

Page 151

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
established under the original permission and consequently, it is not necessary to
revisit whether or not it is compliant with the settlement strategy. This is an application
to delete the requirements of the condition on an existing permission. In order to
address the determining issues, the key considerations are therefore: 
1. Compliance with the adopted Development Plan and other planning policy 
2. Deletion of condition 11; and 
3. Any other material considerations. 
3.  Compliance with the Development Plan 
3.1 The Development Plan has changed since the determination of the original application.
The Development Plan now comprises the adopted National Planning Framework 4
[NPF4], in addition to the adopted Argyll and Bute Council Local Development Plan 2,
2024 [LDP] and all statutory and supplementary guidance. Notwithstanding this, it
should be noted that the original application report of handling also considered the
application against the policies of the draft NPF4 document, which have effectively
been replicated in the adopted NPF4, as set out below. As approval of this current
application would grant a fresh planning permission for the proposals, it is necessary
to address the relevant policy framework for the application where the framework
differs from that of the previous LDP, in addition to addressing any relevant matters
raised by the request to delete Condition 11 and amend other relevant conditions. 
3.2 As the proposals involve an amendment to an existing live consent, there is no
opportunity for the Planning Authority to revisit the principle of the development, or any
facets of the original permission that do not form part of the proposed amendments. 
Therefore, in this instance, the assessment of the proposals relates solely to
consideration of any impacts that may arise from the deletion of condition 11, which
required all buildings to be constructed 300mm above the adjacent ground levels. The
main matters for the Council’s consideration are, therefore, whether the development
would continue to comply with the Development Plan based on the new suite of
conditions.   
4.  National Planning Framework 4 
4.1 National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for
Scotland.  It sets out spatial principles, regional priorities, national developments, and
national planning policy.  NPF4 supports the planning and delivery of sustainable
places, liveable places, and productive places. As the proposal continues to seek
permission for an electrical substation to facilitate the transmission of existing and
future renewable energy projects within this part of Argyll and Bute, helping to tackle
issues of climate change, it is considered that the amended proposals continue to
accord with the relevant policies of NPF4. Of particular relevance is assessment
against NPF4 Policy 22 – Flood Risk and Water Management, which seeks to reduce
the vulnerability of existing and future development to flooding. In this respect, noting
that the Council’s flooding consultee has no objection to the removal of the condition
requiring finished floor levels 0.3 metre above the adjacent ground levels, and that the
applicant would be seeking to construct all proposed buildings 0.15 metre above
existing ground levels, the amended application is considered to comply with NPF4
Policy 22. 
5.  Argyll and Bute Local Development 2 
5.1 The original application was assessed against the policies of the draft Argyll and Bute
Local Development Plan 2, in addition to those of the adopted Argyll and Bute Local
Page 151

Page 152

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Development Plan 2015. In terms of the minor changes to the previously approved
scheme, consideration has been given to whether the proposals continue to comply
with the provisions of the current adopted Local Development Plan.  Following a
detailed assessment of the application against the relevant policies of the adopted
Argyll and Bute Local Development Plan 2, in particular Policy 55 – Flooding, which
requires all development proposals to demonstrate that all risks of flooding are
understood and addressed, and that the development would remain safe and
operational during floods, and noting the relevant consultee responses advising no
objections to the removal of condition 11, it is considered that the amended proposals
are acceptable.   
5.2 The detailed assessment of the application has fully considered impacts on
international, national and local designations, impacts on carbon rich soils, deep peat
and priority peatland habitat, economic benefits, contributions to renewable energy
targets, effects on natural heritage and ecology, landscape and visual impacts,
cumulative impacts, public access, the historic environment, tourism and recreation,
road safety and traffic, hydrology, water environment and flood risk, and environmental
protection.               
6.  Public Representation 
6.1 No representations to the amended application have been received. 
7.  Conclusion 
7.1 Permission is sought under Section 42 of the Planning Act to delete condition 11 of the
original permission, 22/00782/PP, a condition requiring that the finished ground floor
levels of all buildings on the site are elevated to 0.3 metre above surrounding ground
levels. As stated above, the effect of granting a Section 42 application Permission is
such that a new permission exists for the development with different or no conditions
attached. Planning Authorities should attach to the new permission all of those
conditions from the previous permission, where applicable, and amended/reworded as
necessary. All relevant matters have been taken into account when appraising the
application, including the likelihood of significant adverse effects likely to occur as a
result of not requiring all buildings to incorporate raised finished floor levels of 0.3
metre. The Council is supportive of renewable energy projects in line with National
Policy. The impact of a new electrical substation has been deemed acceptable in this
location and the development is under way on site. There have been no objections
raised in respect of this further application from third parties or statutory consultees.
All relevant matters have been taken into account when appraising this application. 
7.2 The proposed development remains exactly the same as that approved and currently
under construction under the original Planning Permission ref. 22/00782/PP with no
changes to the site layout, proposed buildings, infrastructure or access arrangements.
Full details of the proposed development originally approved are contained in the
Report of Handling for permission ref: 22/00782/PP.     
7.3 On the basis of all of the above, the proposal is considered to be consistent with
policies in both the National Planning Framework 4 (NPF4) and the Argyll and Bute
Local Development Plan 2. Therefore, it is recommended that the application to delete
condition 11 attached to planning permission 22/00782/PP is granted, which effectively
renews that planning permission for a further three years.   
Page 152

Page 153

Page 153

Page 154

This page is intentionally left blank

Page 155

Classifcation: Official 
ARGYLL AND BUTE COUNCIL 
DEVELOPMENT AND ECONOMIC GROWTH
____________________________________________________________________________ 
MASTERPLAN REPORT 24/00604/MPLAN 
DUNOON & KILBRIDE HILL STRATEGIC MASTERPLAN
____________________________________________________________________________  
(A)  INTRODUCTION 
The Dunoon Project Limited is a registered community-based charity that has produced a
strategic masterplan, in consultation with the local community and key stakeholders to
guide the development of a new tourist and recreation attraction on Kilbride Hill, Dunoon
(also to be known as ‘The Dunoon Project’). The Strategic Masterplan identifies a set of
broad and overarching development principles to deliver the vision of creating: “The place
for nature-based world class adventures, attracting visitors to our thriving community
connected to an outstanding environment”. 
The long-term aim of The Dunoon Project is to guide the development of a sustainable,
world-class outdoor activities hub on the surrounding hills and forests to re-establish
Dunoon as one of Scotland’s premier tourism destinations. The objective is to increase
tourism by attracting new visitors to the area and persuading those visitors who usually
pass through Dunoon on their way to other destinations in Argyll and Bute (and beyond)
to stay in the town. This will boost the local economy by increasing local tourism spend,
supporting business development and job creation opportunities. To achieve these
objectives, the indicative proposals for the Dunoon Project to be developed incrementally
over a period of 20 years include:
• A new ‘gondola’ style cable car from the site of the former Glenmorag Hotel to the
summit of Kilbride Hill where a ‘Top Station’ will be located;
• A ‘zip wire’ facility that will travel down the hill, passing alongside Bishops Glenn
Reservoir where educational and community facilities will be located (alongside
potential hydro-power);
• Extensive new trail works comprising of c.40km of new designated mountain biking
and walking routes and upgrades to pre-existing trails;
• Potential new range of zero carbon accommodation including tent pitches and eco-
camping pods / woodland cabins;
• The potential for the use of hydro-power/ renewable energy to power the gondola
system; and
• Potential large-scale re-wilding including the protection and enhancement of
existing peat land environments.
The areas of Bishop’s Glen Reservoir and Kilbride Hill are currently used for recreational
and leisure purposes, hosting a variety of local groups. In addition, Active Argyll note that
Page 155 Agenda Item 8

Page 156

Classifcation: Official 
there are currently 14 mapped mountain bike trails on the hills totalling to c.8.7km of
mountain bike specific trails. Of these, 12 are marked as 'Black or Expert Grade' and two
are marked as 'Blue or Moderate' cycling trails. Two of the black-graded trails lie north of
the site and are outwith the indicative strategic masterplan boundary.
Land ownership and finance model
In terms of ownership, the masterplan details that both land acquisition and land
agreements will be required to deliver the project. The former Glenmorag Hotel site and
the adjacent ‘Fairy Glen’ site have been acquired to deliver the Glenmorag Base Station
and some of the proposed new accommodation and site parking. The Dunoon Project
Limited is in negotiation with local land owners to agree options to enable the project to
gain access to further required land parcels on Kilbride Hill. The largest landowner within
the area is Forestry Land Scotland (FLS), who support the proposals in principle and are
exploring options for the long-term lease of the Corlarach Forest for The Dunoon Project.
This would provide the major parcel needed for to deliver the route of the gondola and
potential new trails within the area, in addition to providing the land to separate existing
commercial forestry operations from recreational use.
The ambitious nature and scale of the project means that not all the required funding
(estimated at c.£50m) has yet been secured and significant future investment from public
and commercial partners will be required to enable delivery, most likely in a phased
approach. The project has been financed in its initial stages by grants from Highlands and
Islands Enterprise and the UK Government Community Renewal Fund and Community
Led Local Development Funds (administered by Argyll and Bute Council). In the long-term,
the project intends to create a financial vehicle to manage ongoing investment and
community profit sharing (which will occur via a grant system to be managed and
distributed locally on an annual basis by the Dunoon Project Limited). The Dunoon project
also intends to use social impact and sustainability targets which extend beyond the
financial measures of success, which is supported in line with the community wealth policy
of NPF4.
Community and stakeholder engagement 
The Dunoon Project Ltd has undertaken several phases of community engagement since
2017 when the initial ‘charette’ was held to discuss the potential for the project. Further
events have included:
• Four stakeholder workshops on 9th, 10th March 2022
• Two public open days at Queens Hall on 14th and 15th September 2022 with over
500 visitors, where questionnaires were made available for deposit 2 weeks after
the event and 263 completed questionnaires were received. 
The proposals have been developed in response to the comments received from local
community and key stakeholders. These comments suggested: the creation of a new hub
at Glenmorag; variation in accommodation offer; extending and connecting the town;
creating an extensive trail network and creating a planet positive development with an
educational element. Further consultation would be undertaken at the detailed design
stage for each of the key sites as part of the planning process. There is potential for future
planning applications to be major applications (as defined by the Town and Country
Planning (Hierarchy of Developments) (Scotland) Regulations 2009), if this is the case,
Pre-Application Consultation (PAC) and Proposal of Application Notice (PAN) reports will
also be required. 
Page 156

Page 157

Classifcation: Official 
Form of the masterplan 
The Scottish Government defines Masterplans as: 
‘a plan that describes and maps an overall development concept, including present and
future land use, urban design and landscaping, built form, infrastructure, circulation and
service provision. It is based upon an understanding of place and it is intended to provide
a structured approach to creating a clear and consistent framework for development’ (PAN
83). 
The Scottish Government endorses the use of Masterplanning in general, but considers
that it is especially useful for large sites and in areas/sites which are going to undergo
substantial change, have multiple uses, or are sensitive in environmental or landscape
terms. Given the spatial and temporal scales of the proposed project and the woodland
and hillside location, which although not statutorily protected, is more environmentally
sensitive than an urban location, a masterplan approach is welcome. 
Argyll and Bute Council Technical Note 01: Masterplanning (TN01, June 2016) requires
masterplans within identified Strategic Masterplan Areas in the Local Development Plan
to enable co-ordinated delivery of large scale, multi-phased and strategically important
developments. Although this site is not identified in Local Development Plan 2, it has
potential to support the Dunoon Regeneration and Area for Action (A1004). It is also a
‘large scale proposal’ with mixed use proposals and complex issues and a masterplan
approach is therefore appropriate to demonstrate how the proposed development will
relate to the wider area and how the project would be phased. The TN01 sets out that a
masterplan approach is necessary for “Proposals outwith an allocation or PDA which
propose a phased approach or involve complex issues and which may impact on the
identified issues highlighted in the SMA schedule or Action Programme”.
The submitted Dunoon and Kilbride Hill Strategic Masterplan comprises a series of
illustrative plans and accompanying written text describing how the project will develop. It
demonstrates a clear understanding of place and it is intended to provide a structured
approach to creating a clear and consistent framework for future development in this
location based on a set of key principles:
• Landscape and Marine Gateways: Establish 6 identified marine or landscape
gateways to the site which link into public transport networks. The core Marine
Gateways are: Dunoon Pier, The Glenmorag Hotel and the Western Ferries
Terminal. These are all connected by the coastal link of the A815. The key
landscape gateways include fire road network accesses as follows: to the South at
Bullwood Road, centrally at the entrance to the Glenmorag Reservoir and to the
North, a path at Alexander Street (this gateway provides the most direct
relationship to Dunoon town centre).
• Safety Separation and Integration: New development must mitigate the
identified potential 'collision points' (p.63) between users through safety
mechanisms such as early warning systems, trail design, clear signage and
information strategy across the site, which displays relevant safety information, trail
grading information and reinforces good etiquette for all users. Clear sign posting
also facilitates way finding. 
Page 157

Page 158

Classifcation: Official 
• Landmarks and Nodes: Glenmorag Base Station and Kilbride Hill Top Station
should be viewed as landscape nodes and new hubs/multifunction mixed-used
areas with accessible public realm providing core facilities essential for outdoor
activities. Any development should be architecturally significant, recognisable and
of high design quality. 
• Access for All: The Gondola style uplift facilitates equal access for all to Kilbride
Hill. Future trail designs will incorporate accessibility measures such as enhanced 
trail widths and safe, well located rest stops.
• Opportunities for Accommodation: Incorporated within the masterplan to
support the project and meet an identified need for variation in the local
accommodation offer for camping, caravan hook-up and luxury eco-camping pods. 
• Biodiversity Enhancements: The majority of Kilbride Hill is used for commercial
forestry purposes with regular felling of large areas. However, there is significant
potential for c.9.7ha peatland renewal in addition to rewilding of a c.8.2ha felled
site which is closely linked to existing and potential trail locations.
Key Sites
The Strategic Masterplan identifies three key sites, providing indicative designs for these
to demonstrate potential options for the quantum of development, the zoning and
circulation and development blocks and built form. The intention is that these form an
illustrative base on which more detailed proposals can be developed in the future as
funding is secured and land agreements finalised. These designs feature four phased
‘options’ for each site which will allow the proposals to grow and develop incrementally,
with planning applications likely to be required as each site moves through temporary to
permanent future development proposals:
• Glenmorag Base Station - with core facilities (ticket office, tourist information,
showers changing and wash stations) as well potential commercial, cafe, retail and
mixed-use space. The base station will also contain the final finishing point for the
zipline and a ‘pump track’ and feature an activated ‘plaza’ and links to existing
features in West Bay (e.g. ABC car park and West Bay Play Area).
• Bishops Glen Reservoir – zip line, hydro power station, WC and changing facilities
education centre and nature watching structures. 
• Kilbride Top Station – zipline, gondola top station (including potential for café and
viewing platform, WC/changing facilities, workshop for bike repair) biodiversity
enhancements.
Other components of the masterplan include:
• Public Transport Strategy
• Public Realm Strategy
• Wayfinding Strategy and Public Art
• Trail Structure
The Dunoon and Kilbride Hill Strategic Masterplan has been prepared to support the
progress of The Dunoon Project, which will require significant future financial investment
to enable delivery.  The Strategic Masterplan provides an appropriate framework for
Page 158

Page 159

Classifcation: Official 
delivery of development in a flexible, phased format which the Council can consider and
endorse as a further material consideration in the determination of future planning
applications for the site. As future planning applications come forward, further detailed
site-wide supporting information will be required in relation to transport and parking, flood
risk and drainage, biodiversity, servicing (including utilities and waste management) and
community benefit as highlighted in Section F of this report.
__________________________________________________________________________ 
(B) RECOMMENDATION 
It is considered that the components of the proposed Strategic Masterplan including the
vision, principles and indicative site designs are appropriate for the sustainable
development of the site area. The indicative site designs provide a framework to guide
more detailed future planning applications. 
It is recommended that the strategic masterplan be endorsed and shall form a material
consideration in the determination of future planning applications. Given the outline nature,
the strategic masterplan should be updated as developments are approved at the site in
conformity with the masterplan which prove to have implications for the delivery of
development within the remainder of the site. 
____________________________________________________________________________ 
(C) CONSULTATIONS   
Area Roads Authority 
While the Area Roads team is generally supportive of the proposal, further detail  is
required on the locations that are to connect to the adopted road network and in particular,
the main centre at the West Bay on the former Glenmorag Hotel site. This would include,
but not be limited to, carriageway junction layout, footway access details,  sightlines,
drainage proposals, off-street parking capacities and public utility connections to existing
or for new i.e. electricity, gas, phone, water and sewage. 
Before any planning application is submitted, a transport management plan should be
undertaken which details how the site will be accessed by all transport modes and how
parking will be managed in and around the site. Detailed information should be provided
on the proposals in the ‘temporary’ phases of the masterplan delivery to utilise vehicular
uplift to the summit of  Kilbride Hill, particularly where this will require upgrades to existing
single-lane roads and forestry tracks. This assessment should include the ‘worst case’ or
‘maximum’ impact scenario as a result of the proposals. 
Flood risk and drainage 
Elevations at the site range between approx. 500m AOD at Bishop’s Hill in the west and
5m AOD at the A815 road in the east. A number of small water courses flow through the
site, including Balgaidh Burn, Badd Burn and Morag’s Fairy Glen. The site is partially
overlain by the indicative limits of fluvial flooding, as per the SEPA Future Flooding Maps,
with extents overlying the channels of the Balgaidh Burn watercourse and the Bishops
Glenn reservoir. The proposed building station for one of the zip wires is located within
this fluvial flood extent. It is recommended that this be relocated so that it is outside of the
flood extent, ideally at least 12m from the Balgaidh Burn. All other watercourses within the
Page 159

Page 160

Classifcation: Official 
site have catchment areas of less than 3km and are not accounted for in the SEPA Fluvial
Maps. The indicative limits of surface water flooding overlay with the lower-laying channels
of the Badd Burn, Berry Burn and Fairy Glen, as well as at a number of small areas around
the site. It is noted that the proposed ground for the proposed campsite and buildings for
gondola infrastructure are not overlain by the surface water flood extents which is
welcome. 
The proposed mountain bike trails cross over the watercourses in a number of places.
These should be designed in a way so as not to reduce the existing capacity of the
channel, and if possible be designed to convey the 200 year plus climate change flow. 
No drainage design plans have been provided. The creation of mountain bike trails could
increase the surface water run-off from the hillside. Therefore, it is recommended that
drainage water is designed in line with CIRIA C753. At the campsite, surface water
drainage should be designed such that post-development surface water runoff does not
exceed the pre-development surface water. Email response dated Friday 7th June 2024. 
Public Protection 
Environmental Health have advised that they can provide advice relating to licensing, food
hygiene and health and safety. They have not raised any objections regarding any of the
specified developments. Standard planning conditions are likely to be required to ensure
the quantity and quality of private water supplies serving the developments at the planning
application stage. Email responses dated 8th July 2024. 
Core Paths Team 
Supportive of the strategic masterplan as the proposals could be a great asset for the
area. Provide clarification that other than on designated Downhill Mountain Bike Routes,
the Land Reform Scotland Act 2003 provides the public with a legal right of responsible,
non-motorised access to most land, including the existing forestry roads and paths within
the proposed masterplan area. In addition, there are a number of Core Paths within the
proposed masterplan area including: C210(b) Dunoon to Bishop’s Glen loop, C229(a)
Berry Burn to Bishop’s Glen, C228(a) Corlarach loop trail to Bishop’s Glen and C306(c)
(b) Morag’s Fairy Glen. The proposed base station would also be within joining distance
of the C207 Sandbank to Toward path. The proposals should protect and where possible,
enhance these routes and work to improve wider connections through additional link
implementation, signage and path improvements. 
The Core Paths team will be happy to provide more detailed feedback on the site-specific
planning applications. Email response dated 3rd July 2024. 
ABC Estates and Land 
The Council’s Estates team supports this ambitious project for the boost it would provide
to the Dunoon area. However, it is noted that there are Council land holdings within the
proposed masterplan area and the process of acquisition or leasing, granting rights or
oversailing requires early engagement with the estates team. The Council’s assets can
also be subject to existing tenancies, agreements or wayleaves and for complex projects
such as this we would suggest allowing a minimum of 12 months for any new proposals
to be considered, approved and formalised. Email response dated 29th August 2024. 
Page 160

Page 161

Classifcation: Official 
Officer note: The endorsement of this masterplan is without prejudice to any land
acquisition or leasing arrangements which would proceed separately and independently
of the planning process. 
West of Scotland Archaeology Service 
The proposals would appear to raise only minor archaeological issues depending on the
scale of developments that are ultimately proposed. There are a few recorded sites within
the area to be avoided and a ground survey would be required at an initial stage to
determine whether unrecorded remains are present. Larger areas of proposed ground
disturbance would require intrusive evaluation in advance of any development. Planning
conditions could be used to deal with these matters when the planning applications come
forward for the individual sites. Email response dated 7th June 2024. 
SEPA 
No objection and provide further detail for scoping of individual issues such as peat and
peatland impacts, Outline Peat Management Plan, water environment, flood risk,
Groundwater Dependent Terrestrial Ecosystems, Forest removal and forest waste,
Pollution prevention and environmental management. Emailed letter dated 23rd May 2024. 
NatureScot 
Do not offer formal comment as the Proposal falls below threshold as it is not located
within the range of national or international designations. Instead offers advice on wider
countryside issues relating to ornithology, other protected species, peatland and
biodiversity enhancements. Emailed letter dated 11th July 2024. 
RSPB 
Support the dynamic and inspiring masterplan but disappointed that it lacks focus on
nature-based outcomes to enhance well-being. Most of the site is currently managed for
commercial forestry and there are many opportunities to improve habitats for biodiversity
such as the creation/restoration of peatland, open ground and native woodland, scrubland
within and beyond the site. There is potential for this site to impact on golden eagles and
the masterplan should employ a suitable consultant and engage with the Argyll Raptor
Study Group and NatureScot to ensure the proposals do not impact on these protected
species. The masterplan should also incorporate proposals for the biodiversity
enhancement in line with NPF4 Policy 3 and there are opportunities for Native Atlantic
rainforest restoration within the area, requiring rhododendron removal. Emailed letter
dated 12th July 2024. 
Scottish Forestry 
No objection but require ongoing engagement as proposals are developed due to the
impact on the woodland asset. Scottish Government policy (NPF4 Policy 6) only supports
woodland removal where it would achieve significant and clearly defined additional public
benefits and where this is accepted; a package of compensatory planting may form part
of this balance. The removal of large areas of woodland will not be supported and forest
design guides will need to be considered for any parts of the proposals which will pass
through existing forestry. There is an overlap in consenting processes for development
within a forest. Ongoing consultation and discussion should ensure a clear consenting
route for any proposals.
Page 161

Page 162

Classifcation: Official 
The appropriate consenting route for the management felling required to accommodate
construction of the Development would be managed through the planning system.
However, there may be knock on effects in design planning resulting from the
development in the wider forest area and any felling and restocking, not directly required
for the development should follow the usual consenting routes under the Forestry and
Land Management (Scotland) Act 2018. Emailed letter dated 22nd August 2024. 
South Cowal Community Council (4.7.2024) 
South Cowal Community Council fully supports this application and feel that the project
should be a tremendous boost for the local economy. 
Dunoon Community Council 
No response received.  
____________________________________________________________________________ 
(D) PUBLICITY   
The masterplan has been advertised in the Dunoon Observer – publication date 24st May
2024, expiry date 21stJune 2024. One letter of support has been received. 
(E) REPRESENTATIONS   
One expression of support has been received from Alan Stewart, 4th July 2024 which is
summarised as follows: 
South Cowal Community Council fully supports this application and feel that the project
should be a tremendous boost for the local economy. 
Comment: Noted. 
Full details of this representation can be view on the Council’s website www.argyll-
bute.gov.uk
_________________________________________________________________________ 
(F) ASSESSMENT 
1. List of all Development Plan Policy considerations taken into account in
assessment of the masterplan 
PAN 83 - Masterplanning 
National Planning Framework 4 (NPF4) (Adopted 13th February 2023) 
NPF4 Policy 1 – Tackling the climate and nature crises
NPF4 Policy 2 – Climate mitigation and adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural places
NPF4 Policy 9 – Brownfield, vacant and derelict land and empty buildings
NPF4 Policy 11 – Energy
Page 162

Page 163

Classifcation: Official 
NPF4 Policy 14 Design, quality and space
NPF4 Policy 13 – Sustainable transport
NPF4 Policy 20 – Blue and green infrastructure
NPF4 Policy 22 – Flood risk and water management
NPF4 Policy 25 – Community wealth building
NPF4 Policy 26 – Business and industry
NPF4 Policy 29 – Rural development
NPF4 Policy 30 – Tourism 
Argyll and Bute Local Development Plan 2 (LDP2) (adopted 28th Feb 2024) 
LDP2 Policy 02 – Outwith Settlement Areas
LDP2 Policy 04 – Sustainable Development
LDP2 Policy 05 – Design and Placemaking
LDP2 Policy 06 – Green and Blue Infrastructure
LDP2 Policy 08 – Sustainable Siting
LDP2 Policy 09 – Sustainable Design
LDP2 Policy 10 – Design: All Development
LDP2 Policy 14 – Bad Neighbour Development
LDP2 Policy 21 – Sites of Archaeological Importance
LDP2 Policy 22 – Economic Development
LDP2 Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
LDP2 Policy 32 – Active Travel
LDP2 Policy 34 – Electric Vehicle Charging
LDP2 Policy 35 – Design of New and Existing, Public Roads and Private Access
LDP2 Policy 37 – Development Utilising an Existing Private Access or Private Road
LDP2 Policy 38 – Construction Standards for Public Roads
LDP2 Policy 39 – Construction Standards for Private Access
LDP2 Policy 40 – Vehicle Parking Provision
LDP2 Policy 41 – Off Site Highway Improvements
LDP2 Policy 55 – Flooding
LDP2 Policy 59 – Water Quality and the Environment
LDP2 Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
LDP2 Policy 61 – Sustainable Drainage Systems (Suds)
LDP2 Policy 62 – Drainage Impact Assessments
LDP2 Policy 63 – Waste Related Development and Waste Management
LDP2 Policy 73 – Development Impact on Habitats, Species and Biodiversity 
Land Use Designations in LDP2:
• Zoned as Settlement and Countryside Area
• Within Dunoon Regeneration Area (Diagram 1)
• Area for Action 1004 Dunoon – Town Centre/Waterfront/West Bay
• Strategic Economic Investment Location (Diagram 5: Economy)
• Dunoon Tourism Development Opportunity (Diagram 6: Tourism) 
Other Relevant Policy Considerations: 
• ABC Technical Note 01 – Masterplanning (2016)
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC Technical Note 06 Sustainability Technical Notes and Checklist
• ABC Technical Note 07 Sustainable Buildings Checklist
• Argyll & Bute Council Economic Strategy Refresh (2024-2034)
Page 163

Page 164

Classifcation: Official 
2. Settlement Strategy 
The proposed masterplan site lies partly within the Dunoon Settlement Area (where the
Glenmorag Base Station is proposed) with the remainder of the masterplan area and
strategic sites (including Bishop’s Glenn Reservoir and Kilbride Hill Top Station) located
within the Countryside Area as defined in LDP2. 
The proposed development of the Base Station within the Settlement Area on the site and
grounds of the now demolished Glenmorag Hotel, would broadly comply with LDP2 Policy
01 – Settlement Areas, which makes provision for redevelopment of brownfield sites which
are compatible with surrounding uses; provides access, service areas,  infrastructure for
existing, proposed or potential future development; is of an appropriate scale and fit for
the size of settlement in which it is proposed; and, respects the character and appearance
of the surrounding townscape in terms of density, scale, massing, design, external finishes
and access arrangements. 
The principle of development for eco-tourism and leisure uses on the Bishops Glen and
Kilbride Hill Top Station key sites is likely to be acceptable in a countryside location
provided any future planning application effectively demonstrates that it is “sustainable
development… of an appropriate scale, design, siting and use for its countryside location”
in accordance with LDP2 Policy 02 Part A (parts B and C are not applicable). As the
strategic masterplan is outline in nature and the proposals for the key sites provide only
indicative siting and floorplans, further detail will be required on all proposed aspects of
development as the key sites come forward to allow assessment against LDP2 Policy 02. 
LDP2 also requires all new development proposals to be assessed against Policy 04 -
Sustainable Development policy which states that developer should demonstrate
compliance with the following principles: 
a) Maximise the opportunity for local community benefit, including the creation of district
(renewable) heat networks, where viable; 
b) Make efficient use of vacant and/or derelict land including appropriate buildings; 
c) Support existing communities and maximise the use of existing infrastructure and
services; 
d) Maximise the opportunities for sustainable forms of design including minimising waste,
reducing our carbon footprint, increasing energy efficiency, solar panels, ground, water
and air source heat pumps and other forms of renewable energy generation; 
e) Avoid the use of locally important good quality agricultural land; 
f) Utilise public transport corridors and active travel networks; 
g) Avoid the loss of important recreational and amenity open space; 
h) Conserve and enhance the natural and built environment and avoid significant adverse
impacts on biodiversity, natural and heritage assets; 
i) Respect the landscape character of an area and the setting and character of
settlements; 
j) Avoid places with significant risk of flooding, tidal inundation, coastal erosion or ground
instability; and 
k) Avoid having significant adverse impacts on land, air and water environment. 
Any future applications that come forward within the Strategic Masterplan area will be
required to complete the sustainability checklists in the technical notes which accompany
the plan (See LDP2 TN06 Technical Note: Sustainability Checklist and LDP2 TN07
Sustainable Buildings).
Page 164

Page 165

Classifcation: Official 
3. Location, Nature and Design of Proposed Development 
Dunoon is the largest settlement on the Cowal Peninsula adjoined by Sandbank and Kirn
to the north. To the south, lie the smaller linear settlements of Innellan and Toward. All
settlements on the Cowal Peninsula are connected by the coastal road A815. Dunoon
fronts onto the Clyde Estuary and has both passenger (Calmac) and vehicular ferries
(Western Ferries) services to Gourock and Greenock. 
There are a number of walking routes and informal mountain biking trails that are currently
being improved by Active Argyll on the Kilbride Hill and around Bishop’s Glenn Reservoir.
These lie to the north of the proposed Glenmorag Base Station and within the wider
strategic masterplan area. Kilbride Hill and Bishop’s seat are the tallest points on the
Cowal Peninsula and are within walking distance of Dunoon. There are areas of
commercial forestry including Bishop’s Glen Forest and Corlarach Forest (managed by
Forestry Land Scotland on behalf of Scottish Ministers) within the northern area of the
Strategic Masterplan and a number of existing forestry tracks and fire access routes
through the forested area on the hill are proposed to be included within the network of
trails. 
Adjacent to the proposed Glenmorag Base Station there is an Argyll and Bute Council car
park (including the only long stay HGV and coach parking for the town), opposite the West
Bay waterside playspace. Further discussions will be required at the detailed application
stage to ensure the ongoing functionality of these spaces and integration with the
proposed development. 
Dunoon is designated in LDP2 as a Regeneration Area, Strategic Investment Area,
Tourism Development Opportunity and LDP2 Area for Action 1004 recognises the need
for community and tourism-based activity around the Dunoon Town
centre/Waterfront/West Bay area. The ambition to develop a world class tourism facility at
the southern end of Dunoon is supported in line with the economic regeneration objectives
of Argyll and Bute LDP2 and the adopted Argyll and Bute Economic Strategy (2024) which
notes the importance of tourism as a key growth sector for the area. The proposals for a
‘planet positive’ resort which include a hydro-electricity generation plant are particularly
welcome in line with NPF4 Policy 1 ‘Tackling the climate and nature crises’ and NPF4
Policy 2 ‘Climate mitigation and adaptation’. 
Indicative Site Designs/Phasing ‘Options’
The Strategic Masterplan identifies three key sites and provides indicative design ‘options’
to form an illustrative base on which more detailed future proposals can be developed.
Each indicative site masterplan features 4 flexible phased options (not timescale-specific)
including outline building and infrastructure footprints which will allow the proposals to
grow and develop incrementally from temporary to permanent structures as the resort
develops. 
• Glenmorag Base Station: Option 1 includes temporary, moveable structures with
a temporary ‘pump track’ and an initial vehicular uplift to Kilbride Hill towards more
permanent, land mark structures (including the landing structures for the zipline
and gondola uplift) and public realm to create an activated pedestrianised
streetscape in Options 2 and 3. By Option 4, accommodation has been added and
Page 165

Page 166

Classifcation: Official 
the potential for wider integration of the site with adjacent land has been
incorporated.
• Bishops Glen Reservoir: Option 1 explores how vehicle uplift would function in
the absence of the Gondola uplift and zipline, with temporary structures provided
on the southern edge for outdoor learning. Option 2 explores the integration of a
building to provide hydro power for the gondola with incorporated education space
and potential for lookouts/hide structures on the south bank of the reservoir and
other changing facilities/wc and community use structures. Option 3 adds the
zipline and gondola infrastructure and Option 4 incorporates eco-accommodation
around the reservoir.
• Kilbride Top Station: Option 1 would focus on laying the base trail works to the
hill, including upgrades to existing trails and small-scale installation of
signage/information boards and temporary seating and shelters. Option 2 would
integrate permanent small-scale buildings with core facilities (WC, bike repair and
café) which would meet the temporary vehicular drop from the fire road. Option 3
would entail the installation of an ambitious major building at the ‘Top Station’ and
associated infrastructure for the gondola and zipwire. Option 4 seeks to introduce
additional biodiversity measures.
• New trail network of c.40km to offer a wider range of trails and routes, catering
for all abilities to ensure an inclusive experience. Trails would include walking,
running and mountain biking routes. Safety issues and management of conflicts
with commercial forestry operations will need to be carefully considered through a
appropriate Recreational and Forestry Management Plans.
Given the indicative nature of the proposals, a number of further detailed supporting
studies will be required to support future planning applications. It will be necessary to
undertake landscape impact evaluations of the proposals for Bishop’s Glen Reservoir
and Kilbride Top Station as these come forward to fully assess the landscape impacts,
however, it is noted that the proposal does not lie within a designated landscape area.
It is considered that the wider economic growth and regeneration aims may constitute
an appropriate ‘exceptional case’ argument for any localised landscape impacts,
provided the proposals are of an exceptional design quality. It is also noted that all
biodiversity enhancements should be front-loaded into any future planning
applications which should be accompanied by detailed Biodiversity Mitigation and
Enhancement Strategy. 
Materials 
The Strategic Masterplan sets out an indicative building materials palette of timber
cladding, stone and masonry, metal cladding, gravel and compact aggregates, stone
tiles, timber walkways and platforms and green and living walls all of which would be
appropriate in the proposed setting. In terms of architectural strategy, the detailed
design of all proposed buildings and structures will be tailored to the specific location
in compliance with the design policies in LDP2 however, the principles of Life Cycle
Assessments, quality landmark buildings and a modern vernacular style are all
welcome. 
Developments for each of the indicative site designs will require the submission and
proper assessment of planning applications with adequate supporting material.
Page 166

Page 167

Classifcation: Official 
However, it is recommended that this Strategic Masterplan be endorsed and given
material weighting to be used in the assessment of such planning applications. 
4. Economic Development, Tourism and Community Benefit. 
Paragraph 5.10 of Argyll and Bute LDP2 notes the important contribution made by
tourism to the local economy and that the future sustainable growth of tourism has the
potential to support local services and facilities, transport infrastructure, as well as
cultural and heritage events and facilities. Sustainable growth in the visitor economy
is one of the key planks of the National Tourism Strategy and the National Tourism
Framework, the aim of which is to support the increased sustainable growth in the
visitor economy at national and local level. 
LDP2 Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities
establishes that there is a presumption in favour of new or improved tourist facilities
and accommodation where: 
• The development is in a form scale and location which is consistent with its
surroundings; and 
• The proposals respect and integrate well with the landscape/townscape character
and amenity of the surrounding area; and 
• They are located in accessible locations, taking into account the scale and nature
of the proposed development, and include proposals to widen the options for
sustainable travel to access them (including public transport, cycling or on foot); and 
• They are well related to the existing built form of settlement areas or the existing
development pattern outwith the settlement areas and avoid dispersed pattern of
development unless the developer has demonstrated a locational requirement based
upon the need to be near to the specific tourist interest being exploited and that the
proposed development will not undermine these interests. 
The masterplan area is not designated for tourism uses, however, LDP2 sets out clear
recognition of the role played by windfall development to support the economy of our
rural and island areas. This is due in part to the nature of many industries in Argyll
and Bute, which are closely related to a natural or localised resource e.g. aquaculture,
renewables, distilleries, tourism and in part due to the nature of our remote rural area
(para 5.3). It is noted in LDP2 that a flexible approach to Regeneration Areas is
required and this proposal would clearly support the Dunoon Tourism Development
Opportunity and Area for Action 1004 which references West Bay – the site of the
Glenmorag Base Station. 
LDP2 Policy 25 – Tourism Development Opportunities and LDP2 identifies Dunoon in
Diagram 6 as having significant potential for the sustainable growth of the Argyll and
Bute tourism industry. The policy notes that priority will be given to those
developments which make use of previously developed sites, locations which are
accessible by a variety of means of transport, where there is existing infrastructure
capacity, and /or where a proposal will fill a recognised gap in the identified tourism
network. It is considered that the proposed masterplan would meet these policy
requirements. 
Furthermore, LD2 Policy 26 – Informal Public Outdoor Recreation and Leisure
Related Development supports Development which provides for enhanced informal
public outdoor recreation and leisure facilities and attractions or provides improved
opportunities for outdoor access. Particularly, where an identifiable shortfall is
addressed or a positive contribution to the tourism network and visitor experience can
Page 167

Page 168

Classifcation: Official 
be made. The Strategic Masterplan with its proposed improvements to wider walking
and cycling routes throughout and beyond the master plan sites would comply with
the spirit of LDP2 Policy 26. However, given the outline nature of the masterplan,
further detailed information will be required at the planning application stage to ensure
that the proposal can be satisfactorily integrated into the landscape with no adverse
landscape, environmental, access, or servicing impacts. 
NPF4 Policy 25 – ‘Community Wealth building’ supports development proposals
linked to community ownership and management of land. Future planning applications
should be supported by a Community Wealth Building Strategy, which clearly
establishes the role of the local community in the development and ongoing
management of the proposals, as well as any ‘profit sharing’ mechanisms. 
5. Biodiversity and woodland removal 
Given the strategic nature of the overarching masterplan and the indicative nature of
the proposals for the three identified ‘strategic sites’, the comments provided by
statutory consultees will need to be considered in detail and addressed in any future
iterations of the masterplan/site specific briefs and should be fully addressed in any
future planning applications to progress the masterplan proposals. 
In particular, the strategic masterplan makes reference to ‘biodiversity improvements’
and identifies 9.7ha area of peatland on Kilbride Hill as a potential peatland restoration
project in addition to 8/2 ha of felled area to the south of the site which could offer a
large-scale biodiversity enhancement including native species planting. NatureScot
note that the Proposal lies within the temperate rainforest/’oceanic zone’ and as such
habitat creation favouring rainforest biodiversity such as lichens and bryophytes could
be beneficial (e.g. ravine/riparian woodland expansion). 
These proposals are supported in principle and should be further developed to
strengthen the biodiversity offering of the overall project in line with the requirements
of NPF4 Policy 3 and LDP2 Policy 76. In preparing future planning applications, the
applicants should ensure that the proposals comply with LDP2 Policies 77 and 78
relating to the loss of woodland by demonstrating that any necessary felling to create
trails or other areas will be mitigated in line with the sequential approach. In addition,
advice provided by Scottish Forestry on consenting procedures should be taken into
account. 
NatureScot and RSPB have indicated the presence (or potential presence) of a legally
protected species, and this would be an important consideration in decisions on future
planning applications. If there is evidence to suggest that a protected species is
present on site or may be affected by a proposed development, appropriate steps
must be taken to identify, assess and, where appropriate, mitigate the development
impact upon such concerns. The level of protection afforded by legislation must be
factored into the planning and design of the development and any impacts must be
fully considered prior to the determination of any planning applications. 
The detailed advice provided by NatureScot, SEPA and RSPB should therefore be
considered and all appropriate further surveys and assessments provided to support
any future planning applications including:
• Peat surveys
Page 168

Page 169

Classifcation: Official 
• Ornithology surveys i.e. Schedule 1A/A1 species (golden eagle, hen harrier)
and the potential for cumulative impacts from proposed developments in the
wider landscape.
• Biodiversity mitigation and enhancement proposals. 
While the principles of the masterplan are supported, further information on
biodiversity impacts will be required to progress the masterplan to the detailed design
stage. Further detailed discussions on scheme design are recommended with
NatureScot, SEPA and RSPB prior to the submission of any detailed planning
permission to ensure the masterplan delivers the maximum biodiversity
enhancements in line with National Planning Policy. As a general point, future planning
applications associated with the Strategic Masterplan should demonstrate the earliest
consideration and delivery of biodiversity enhancements. 
6. Flooding, drainage and risk assessments 
A number of small water courses flow through the site, including Balgaidh Burn, Badd
Burn and Morag’s Fairy Glen. The site is partially overlain by fluvial flooding, as per
the SEPA Future Flooding Maps, with extents overlying the channels of the Balgaidh
Burn watercourse and the Bishops Glenn reservoir. The proposed building station for
one of the zip wires is located within this fluvial flood extent. It is recommended that
this be relocated ideally at least 12m from the Balgaidh Burn. All other watercourses
within the site have catchment areas of less than 3km and are not accounted for in the
SEPA Fluvial Maps. The indicative limits of surface water flooding overlay with the
lower-laying channels of the Badd Burn, Berry Burn and Fairy Glen, as well as at a
number of small areas around the site. The construction of additional trail systems and
any further development should control and mitigate surface water run-off from the hill
and it will be important to ensure that where trails cross water courses, these are not
narrowed. A detailed drainage and flood risk strategy is needed in line with LDP2
Policy 62 – Drainage Impact Assessment to ensure any additional surface water does
not create further loading on the reservoir or the area of potential adverse flood risk
found at Blagdaigh Burn. 
Given the outline nature of the Strategic Masterplan, little detail is provided on water
supply or waste waster servicing. LDP2 Policy 60 - Private Sewage Treatment Plants
and Wastewater Drainage Systems specifies the requirement for development to
connect to public sewers unless a connection is not feasible. 
Any future proposals will be regulated under the building standards to ensure that they
are capable of being provided to a safe, effective and appropriate technical standard.
SEPA are responsible for authorising and regulating discharges to watercourses and
they will assess and control pollution, including any possible cumulative impact. At this
stage there is no indication that any of the proposal will have a significant adverse
impact on the environment with regards flood risk or drainage. Consideration should
also be given to peat landslide risk within the masterplan area in line with LDP2 Policy
51. 
The proposals within the Strategic Masterplan are not considered to raise material
issues with regard to LDP2 - Policy 55 ‘Flood Rish’ as well as NPF4 – Policy 22 ‘Flood
risk and water management’. These matters can be adequately addressed at the
detailed application stage. 
Page 169

Page 170

Classifcation: Official 
7. Road Network, Parking and Associated Transport Matters 
The core network of fire roads and trails within the area of Kilbride Hill is relatively well
established. The fire road network has 3 key access points, 1 from Kilbride or Crochan
Road, via Bishop’s Glen Reservoir, which is the most direct access within the site.
There is also an access point to the North of the site, via the A885 near Ferry Road
and the South from Bullwood Road passing Ardhallow Battery. There is also a large
area of woodland currently under commercial forestry operations, which is accessed
via the fire road network. 
Access to the site for vehicles is limited by Kilbride Road, and internally within the
Glenmorag site by a short steep single-track access. This may require improvements
or upgrades to accommodate vehicle traffic. The existing Argyll and Bute Council
Glenmorag Car Park accessed off Kilbride Road has the potential to serve or be linked
to the project – although this site is currently the only long stay coach and HGV parking
facility in the town and this function will need to be protected. Proposals for accessing
the site should take consideration of LDP2 Policy 35 – Design of New and Existing,
Public Roads and Private Access, LDP2 Policy 37 – Development Utilising an Existing
Private Access or Private Road, LDP2 Policy 38 – Construction Standards for Public
Roads and LDP2 Policy 39 – Construction Standards for Private Access. 
Dunoon has a well-established road network, but additional private motor vehicle
movements due to increased visitors to The Dunoon Project may be challenging to
accommodate. Any early stages of the project reliant on vehicular uplift to Kilbride Hill
will require impact assessments (particularly where neighbouring properties may be
impacted). Parking management will be an important consideration – both on and off
site and any future proposals should consider the requirements of LDP2 Policy 40 –
Vehicle Parking Provision and LDP2 Policy 41 – Off Site Highway Improvements. 
However, the project aspires to deliver active travel and the draft public transportation
strategy encourages users to cycle / walk directly from the ferry to the project, or use
local bus services to gain access to destinations. All future proposals should
incorporate active travel measures in line with LDP2 Policy 32. 
The area roads engineer has been consulted and initial comments have been
provided. They have advised that the situation will be continually reviewed as each of
the phases/planning applications are brought forward with regard to the capacity of
the exiting road network and available parking spaces within Dunoon. A Traffic
Management Plan and Waste Management/Servicing Plan will also be required to
support any future planning applications. 
8. Bad Neighbour Development 
Some of the proposals, such as the campsite and gondola have the potential to cause
odour or noise nuisance. Public Safety can offer the applicants advice on this as well
as licencing, food hygiene and health and safety matters. The principle of a tourism
facility is considered to be acceptable and there is no indication that this stage that
such a use would be incompatible with the surrounding area, provided careful
consideration is given to managing potential conflicts at the detailed design stage.
Planning applications would be subject to consultation with Public Safety and
assessment under LDP2 Policy 14 – Bad Neighbour Development. 
9. Phasing
Page 170

Page 171

Classifcation: Official 
The Strategic Masterplan sets out a ‘Long term phasing strategy’ which is outcome-
related (the indicative site designs provide non-timescale specific development
phases):
• Phase 1 2023/24: Strategic masterplan developed, submitted and possible
temporary planning permissions sought.
• Phase 2 2024/2027: Core infrastructure installed (gondola, uplift, trail
improvements and new accommodation), applications for further development
submitted, public transport improvements to support increasing visitor
numbers.
• Phase 3 2027/2035: Project well established, opportunities to improve trail and
accommodation offer.
• Phase 4 2035/37: Trails begin to expand further to western side of the
Peninsula along Loch Striven, biodiversity enhancements established and
widened, Ferry and integrated transport hub at Gourock operational.
• Phase 5 2037/42: Dunoon recognised as a Marine Gateway to Loch Lomond
and the Trossachs National Park 
This proposed phasing is indicative, given the dynamic nature of the overall proposals
and the uncertainties surrounding funding. While the flexible approach to phasing is
noted, it is expected that required supporting infrastructure improvements are likely to
need to be carried out commensurately with the scale of development as each
phase/strategic site progresses. Some element of whole-site planning (including a
number of supporting studies) will be required at the outset to support any future
planning applications for this proposed masterplan area. 
____________________________________________________________________________ 
(G) CONCLUSION 
The vision of the Dunoon and Kilbride Hill Strategic Masterplan to deliver a world-class
outdoor recreation and tourism attraction is supported. The Strategic Masterplan
considers how the proposal would develop incrementally and integrate within the town and
wider area. The Strategic Masterplan gives appropriate consideration to settlement
strategy policy, access requirements, landscape, infrastructure and compatibility between
existing and potential future uses. 
A full assessment of the siting, massing, building design, landscaping, access, water
supply, drainage arrangements for developments within the masterplan area will be
assessed via future application(s) for planning permission. A number of plans will be
required to address forestry and recreational management, transport impacts, biodiversity
mitigation and enhancement and community benefit to support any future planning briefs
or planning applications for the key sites. 
There are no objections from consultees and no objections have been submitted following
the requisite public consultation period for the masterplan. 
It is therefore concluded that the Strategic Masterplan document should be endorsed. 
____________________________________________________________________________ 
(I) IMPLICATIONS 
Page 171

Page 172

Classifcation: Official 
Policy: None 
Financial: None 
Personnel: None 
Equal Opportunities: None 
____________________________________________________________________________ 
Author of Report:   Shelley Gould  Date: 09.10.2024 
Reviewing Officer:   Sandra Davies  Date:  09.10.2024 
Fergus Murray
Head of Development and Economic Growth 
Page 172

Page 173

Page 173

Page 174

This page is intentionally left blank

Page 175

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the Town
and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
relative to applications for Planning Permission or Planning Permission in Principle 
Reference No: 24/01098/PP
Planning Hierarchy: National Application
Applicant: Scottish Hydro Electric Transmission Plc
Proposal: Section 42 Application for variation of condition 7 relative to planning
permission reference 23/00382/PP (Erection of high voltage electricity
substation and formation of associated access, landscaping, drainage and
means of enclosure and platform extension
Site Address:  Land Adjacent To Crossaig Sub Station, Skipness    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• A substation platform extending approximately to 2.4 ha for the new Crossaig North  
substation;
• A 275 kV Gas Insulated Switchgear (GIS) Building, maximum height 16m;
• A 132 kV Gas Insulated Switchgear (GIS) Building, maximum height 16m;
• Installation of two 275/132 kV supergrid transformers (SGT), rated at 480 MVA, each located
in a ventilated building of maximum height 18m;
• Installation of two gantries and electrical equipment to connect the OHL and the proposed
substation;
• A temporary works area (TWA) adjacent to the substation site, of approximately 3 ha and
areas for temporary peat storage;
• Diesel Generator and 2 automatic voltage regulators;
• Borehole for water and septic tank;
• Turning and parking areas;
• Use of existing forestry access tracks (those being the existing Cross Kintyre Haul Road and
Cour Estate track), approximately 25 km in length to enable access to the existing Crossaig
substation. Ongoing maintenance of this track will be required;
• Construction of a section of permanent access track, approximately 660 m in length between
the existing Crossaig substation and the proposed Crossaig North substation and for access
to the SuDS pond;
• A 2.4 m high security fence of palisade construction around the substation perimeter; and
• Foul and surface water drainage (Sustainable Drainage System (SuDS) pond and outfall
pipe);
• An extension to the south of the substation platform at the existing Crossaig substation of
approximately 0.13 ha to support electrical equipment and associated access 
Page 175 Agenda Item 9

Page 176

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
(ii) Other specified operations
• Tree felling and compensatory planting 
Works are also required within the existing Crossaig substation platform to which Permitted
Development rights apply. Those include: 
• construction of a single storey building extension to accommodate expansion of
the existing protection room
• Installation of underground 132kv interconnector cables between existing
substation and proposed substation. 
(B) RECOMMENDATION:
Having due regard to the relevant policies within  LDP 2, NPF 4 and all other material
considerations, it is recommended that planning permission be granted, in accordance with
Section 42 of the Town and Country Planning (Scotland) Act 1997, subject to the conditions
and reasons detailed in this report.   
(C) CONSULTATIONS:   
SEPA – (Dated 24.07.24) -  No objection to rewording of condition 07
Nature Scotland – (Dated 19.07.24) - No comment Offered.
Transport Scotland Dated 26.07.24 -  No objection
WoSAS (Dated 22.07.24) – No Comment as archaeology condition submissions on original               
consent already approved by WoSAS
Area Roads Engineer (Dated 01.08.24)  – No comments 
Tarbert and Skipness Community Council – No response
Environmental Protection – No Response
Biodiversity Officer – No Response
HESS – No response
Access Manager – No response 
(Officer Note* As all details in respect of approval 23/00382/PP remain the same the critical consultee
response in respect of rewording condition 07 relating to peat management proposals is from SEPA 
who requested the wording used in the condition. They have responded with no objection) 
(D) HISTORY: 
21/001884/PAN – Proposal of Application Notice for the erection of electricity substation Opinion
issued on 17.11.21. 
21/01642/SCREEN – Screening opinion for the erection of a 275kV gas insulated switchgear
substation. Opinion issued on 21.3.22 
23/00382/PP – Erection of high voltage electricity substation and formation of associated access,
landscaping, drainage and means of enclosure and platform extension Approve subject to conditions
27.06.23 
(E)      PUBLICITY:   
MREG20 – Regulation 20 Major Application Advert, Expired 23rd August 2024 
Page 176

Page 177

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
(F) REPRESENTATIONS:  No Representations Received 
(G) SUPPORTING INFORMATION:
• Habitat Management Environmental Plan
• Peat Management Plan 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the Conservation (Natural
Habitats) Regulations 1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) Sustainability Checklists (with reference to the requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☐Yes ☒No
☐Yes ☒No  
(v) A report on the impact
of the proposed
development eg. Retail
impact, transport
impact, noise impact,
flood risk, drainage
impact etc:  
☒Yes ☐No 
• Peat Management Plan
• Habitat Management Environmental Plan 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or 32: 
☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations over
and above those listed above which have been taken into account in the assessment
of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024)
Spatial and Settlement Strategy
Page 177

Page 178

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy 
Policy 30 – The Sustainable Growth of Renewables 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private Road
Policy 39 – Construction Standards for Private Accesses 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation 
High Quality Environment
Page 178

Page 179

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular 3/2013. 
• Planning Advice Notes & Web-based Renewables Guidance 
• Renewable energy and climate change framework 
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017) and position Update dated 16.3.21 
• Scotland’s Draft Energy Strategy and Just Transition Plan: Ministerial statement (Dated
10.1.23) 
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• Views of statutory and other consultees,
• Planning history of the site 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation (PAC): 
☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
The opportunity to attend a pre-determination hearing is required to be offered in
relation to applications for planning permission for major developments which are
significant departures from the development plan and for all National Developments.
Their purpose is to allow the views of applicants and those who have made
representations to be heard before a planning decision is taken. The Planning
Authority has discretion over how hearings will operate in its area. The applicant and
consultee(s) who have offered response have confirmed that they do not wish to be
heard, therefore a Hearing will not be required. 
(O)(i) Key Constraints/Designations Affected by the Development:
• Peat
• Forestry Removal 
(O)(ii) Soils
Page 179

Page 180

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Agricultural Land Classification:  Class ? / Unclassified Land / Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Class 4 indicated on Council Maps. Further site
specific information within submitted  Peat
Management Plan 
Peat Depth Classification:  N/A  : Refer to Fig 2.1 of Peat   Management Plan  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment) 
☐No 
Does the proposal include any replacement or
compensatory planting?
☒Yes
☒No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Summary assessment and summary of determining issues and material considerations
A Section 42 application is an application for a new planning permission for a development, but with
different conditions from those attached to a previous permission for that same development. In
determining such an application, the Planning Authority can only consider the changes to the
conditions on the previous permission. The principle of development is not under consideration and
the original permission under 23/00382/PP remains live. 
(i) Principle of Development
Planning Permission (ref. 23/00382/PP), to construct and operate a 132/275 kilovolt (kV) GIS
electrical substation and associated infrastructure, was originally granted on 21.06.2023. It should be
noted that works have now commenced on site, and these works are progressing in accordance with
the original approval and conditions to allow commencement of development have been discharged. 
Page 180

Page 181

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(ii) Proposed Development
The current application has been made under Section 42 of the Town and Country Planning
(Scotland) Act 1997, as the applicant wishes to amend the wording of condition 07 of the original
permission. 
Condition 7 was a condition required the submission of a Peat Management Plan to be discharged
in consultation with SEPA. SEPA have previously approved the proposed peat management plan
and the plan itself remains unchanged from the details that SEPA have already approved. The
condition is listed in full below. The wording that SSEN wish to amend by means of this S42
Application are highlighted in bold and underlined for ease of reference. 
7. No development shall commence until a detailed peat management and reinstatement plan has
been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to the
intended commencement of development date and include details of: 
The written consent of all landowners whose land is to be utilised. 
Methodology and volume of extraction, 
Phasing/timing of any works impacting peat. 
Quality/classification of Peat to be extracted. 
Details of any onsite peat re-instatement and /or enhancement 
Details of storage and transportation 
Details of the location, area, and condition of onsite or offsite peatland to be improved. 
Details of peat enhancement measures on this land 
Details of peatland restoration outcomes to be achieved. 
Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of approved
peatland management plan and retained in perpetuity unless with the written agreement of the
Planning Authority in consultation with SEPA. 
The restored area shall not be subject to any works or operations in the future to undermine the
objectives of the restoration objectives contained in the approved Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the objectives of the
necessary habitat and management plan set out at condition 08 below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement, reuse
and management of peat in accordance with NPF 4 Policy 5 (c) objectives. 
The proposed revised wording of Condition 07 is to 
7. No development shall commence until a detailed peat management and reinstatement plan has
been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to the
intended commencement of development date and include details of: 
This shall include details of: 
The written consent of all landowners whose land is to be utilised. 
Methodology and volume of extraction, 
Phasing/timing of any works impacting peat. 
Quality/classification of Peat to be extracted. 
Page 181

Page 182

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Details of any onsite peat re-instatement and /or enhancement 
Details of storage and transportation 
Details of the location, area, and condition of onsite or offsite peatland to be improved. 
Details of peat enhancement measures on this land 
Details of peatland restoration outcomes to be achieved. 
Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of approved
peatland management plan. The restored peatland shall be maintained in accordance with the
terms of the approved peat management plan for a period of 15 years, from commencement
of works under approved peat management plan. 
The restored area shall not be subject to any works or operations for a period of 15 years, from
commencement of works under approved peat management plan which would undermine the
objectives of the restoration objectives contained in the approved Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the objectives of the
necessary habitat and management plan set out at condition 08 below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement, reuse
and management of peat in accordance with NPF 4 Policy 5 (c) objectives. 
All relevant matters have been taken into account when assessing this further application. It is
considered that the proposal accords with the principles and policies contained within both the
adopted National Planning Framework 4 and the adopted Argyll and Bute Local Development Plan
2. The Section 42 application to amend the planning condition is considered acceptable, subject to
the retention and amendment of the remaining planning conditions in terms of all other applicable
material considerations. 
Taking account of the above, it is recommended that planning permission be approved subject to the
revised condition 07 as per the S42 application. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should be
Granted: 
All relevant matters have been taken into account when assessing this further application. It is
considered that the proposal accords with the principles and policies contained within both the
adopted National Planning Framework 4 and the adopted Argyll and Bute Local Development Plan
2. 
All matters directly related to the variation sought are therefore considered to have been properly
addressed.  Taking account of the above and all relevant material considerations, it is recommended
that planning permission be approved subject to the revised condition 07 as per the terms of the
submitted S42 application. 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
N/A 
Page 182

Page 183

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland: ☐Yes ☒
No 
Author of Report: David Moore Date:07.10.24 
Reviewing Officer: Sandra Davies Date: 08.10.24 
Fergus Murray
Head of Development & Economic Growth 
Page 183

Page 184

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01098/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development
The development shall be implemented in accordance with the details specified on the
application form dated 14.12.22; the Environmental Appraisal (December 2022),
supporting information and, the approved drawings listed in the table below unless the
prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act
1997.
Plan Title.                                                                        Version         Date Received
Site Location Plan (1:75000)                                                                 24.02.23
Red Line Boundary Plan (Fig 1.1)                                                         24.02.23
Revised Site Layout Plan 4534d-DR-P-0017                     Rev 5          26.05.23
Existing Substation Layout and
proposed Extension Plan       4543d-DR-P-0027                                  24.02.23
Septic Tank and Borehole Plan ( Fig
13) (1:2500) 31.03.23
Substation Compound Layout and
Electrical Section Locations 4534d-DR-P-0004                   Rev.2          24.2.23
275Kv Control Building Layout 4534d-DR-P0005                Rev 2          24.2.23
275kv Control Building Elevations 4534d-DR-P-0006          Rev.2         24.2.23
132kv Control Building Elevations 4534d-DR-P-0023          Rev.1         24.2.23
132kv Control Building Layout 4534d-DR-P-0022                Rev.1         24.2.23
Transformer Building Layout 4534d-DR-P-0020                   Rev.1         24.2.23
Transformer Building Elevations 4534d-DR-P-0019             Rev.1         24.2.23
Generator Building Elevations and Floor
Plan 4534d-DR-P-0009                                                         Rev.2         24.2.23
Electrical Layout Elevations 01 4534d-DR-P-0011               Rev.1         24.2.23
Typical Deer Fence and Gate 4534d-DR-P-0016 -                                 24.2.23
2.5m High Security Palisade Fencing
Details CE/34/2015                                                                Rev. E       24.2.23
Site Access Details 4534d-DR-P-0008                                  Rev.2         24.2.23
Proposed Site Access Profiles 4534d-DR-P-0021                 Rev.1        24.2.23
Proposed Site Profiles 4534d-DR-P-0018 Rev.1 24.2.23 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. No construction works shall be commenced until a Finalised Construction
Environmental Management Plan [CEMP] has been submitted to and approved in
writing by the Planning Authority, in consultation with SEPA and other consultees, as
appropriate. The development shall then proceed in accordance with the approved
CEMP unless otherwise agreed in writing by the Planning Authority. The CEMP shall
include:
a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b) Processes to control/ action changes from the agreed SM;
Page 184

Page 185

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
c) Construction Environmental Management Plans (CEMPs) for the construction
phase covering:
i) Habitat and species protection, including ECoW Details, surveys and species
protection plans;
ii) Landscape and Mitigation Restoration Plan including compensatory planting (refer
to Condition 9);
iii) Pollution prevention and control;
iv) Dust management, including construction activity and vehicle movements;
v) Construction noise and vibration
vi) Temporary site lighting;
vii) Watercourse crossings;
viii) Site waste management
ix) Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of high flow
or high rainfall; and a programme of water quality monitoring;
x) Mapping of borrow pits and associated habitats identified for restoration;
xi) Invasive Non-Native Species Management Plan
xii) Emergency Response Plans;
xiii) Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and
xiv) Other relevant environmental management as may be relevant to the development
d) A statement of responsibility to 'stop the job/ activity' if a breach or potential breach
of mitigation or legislation occurs; and
e) Methods of monitoring, auditing, reporting and the communication of environmental
management on site and with client, Planning Authority, and other relevant parties. 
Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management Plan
(CTMP)and Phased Delivery Plan have been prepared and approved in writing by the
Planning Authority and Transport Scotland as the trunk roads Authority. The Plan shall
include details of: 
a) Approved access routes,
• All HGV construction traffic to use the Cross Kintyre Haul Route.
• The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road must not be used by HGV's.
• The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road may be used by LGV related to these works
b) Agreed operational practises (including avoidance of convoy movements,
specifying conduct in use of passing places, identification of turning areas, information
of wheel cleansing facilities, signage to be installed on the A83 warning of construction
traffic, signage or temporary traffic control measures to include for larger or abnormal
loads, reporting of verge damage);
c) The provision of an appropriate Code of Practice to drivers of construction and
delivery vehicles.
d) Abnormal load route surveys and finalised plan (including any accommodation
measures required including the removal of street furniture, junction widening, traffic
management). 
The development shall be implemented in accordance with the duly approved Traffic
Management Plan
Page 185

Page 186

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Reason: To minimise the interference with the safety and free flow of traffic on the
trunk road and to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk or local road network. 
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably
qualified person and shall provide for the recording, recovery and reporting of items of
interest or finds within the application site. Thereafter the development shall be
implemented in accordance with the duly approved details with the suitably qualified
person being afforded access at all reasonable times during ground disturbance
works. 
Reason: In order to protect archaeological resources 
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority.
Thereafter the development shall be carried out in accordance with the approved
details. 
Reason: In order to ensure that any potential adverse impacts on the functioning of
the local housing market and tourist accommodation to the detriment of the interests
of the local community are identified and mitigated in accordance with the
requirements of NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
7. No development shall commence until a detailed peat management and reinstatement
plan has been submitted to and approved by the Planning Authority in consultation
with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months
prior to the intended commencement of development date and include details of: 
Page 186

Page 187

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL  
(i) The written consent of all landowners whose land is to be utilised. 
(ii) Methodology and volume of extraction, 
(iii) Phasing/timing of any works impacting peat. 
(iv) Quality/classification of Peat to be extracted. 
(v) Details of any onsite peat re-instatement and /or enhancement 
(vi) Details of storage and transportation 
(vii) Details of the location, area, and condition of onsite or offsite peatland to be
improved. 
(viii) Details of peat enhancement measures on this land 
(ix) Details of peatland restoration outcomes to be achieved. 
(x) Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of
approved peatland management plan. The restored peatland shall be maintained in
accordance with the terms of the approved peat management plan for a period of 15
years, from commencement of works under approved peat management plan 
The restored area shall not be subject to any works or operations for a period of 15
years, from commencement of works under approved peat management plan which
would undermine the objectives of the restoration objectives contained in the approved
Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the
objectives of the necessary habitat and management plan set out at condition 08
below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate
reinstatement, reuse and management of peat in accordance with NPF 4 Policy 5 (c)
objectives. 
8. No works to excavate any peat on the site shall be undertaken until a Habitat
Management and Enhancement Plan has been submitted to and approved by the
Planning Authority in consultation with its biodiversity advisor. 
Reason: To ensure that works result in habitat enhancement works being undertaken
in accordance with NPF 4 and LDP Objectives. 
9. No development shall commence until a detailed Compensatory Planting Plan (CPP)
and Long Term Forestry Management Plan (LTFMP) are submitted to and approved
in writing by the Planning Authority, in consultation with Scottish Forestry. The
approved CPP and LTFMP shall be implemented in full and in accordance with the
approved timing, unless otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal. 
10. No development shall commence, until a revised Landscape Planting Plan and
Maintenance Plan in accordance with BS EN ISO 11091:1999 has been submitted to
and approved in writing by the Planning Authority. The revised plans must include: 
a) A plan showing numbers and locations of each tree and shrub species;
b) Planting schedule to show for each species, the total number, type and size at
planting;
Page 187

Page 188

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
c) Specification for planting to include ground preparation, planting operations and
protection from herbivores;
d) Compensatory planting scheme for tree loss
e) Schedule of implementation and phasing; 
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained
in accordance with the approved details. Any plant losses within the first five years will
be replaced at the next planting season. 
Reason: To ensure the development conserves and enhances the landscape
character and biodiversity interests of the area. 
11. Any watercourse crossings, hereby permitted, shall be designed to at least the
capacity of the existing channel and to the 1 in 200 year plus climate change flow and
an allowance for freeboard, unless otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk. 
12. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of
the lighting units to be installed shall be specified, and any duly approved lighting shall
be installed in a manner which minimises illumination and glare outwith the boundary
of the application site. The completed site shall not be illuminated other than in the
event of staff being present on site. 
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
13. No development shall take place outside the following hours: 
07.00hrs and 19.00hrs Mon to Friday (inclusive)
07.00hrs and 18.00hrs Saturday 
No construction works shall take place on Sundays or Scottish Bank Holidays unless
as otherwise may be agreed in writing with Environmental Protection Officers in
advance of the operations 
Non-construction work and switching works can be carried out on Sundays and
Scottish Bank Holidays between the hours of 08.00 and 13.00. 
Reason: To minimise the impact of noise, generated by construction activities, on
occupiers of residential properties. 
Page 188

Page 189

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/01098/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1.   Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission
under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary a
planning condition (Condition 07) attached to the original consent for an electrical
substation, seeking a change to the wording of the condition 07 as set out in the main
report. 
1.2. The Approved Development under 23/00382/PP consists of the substation buildings and
electrical infrastructure, and associated works required to accommodate construction and
access. The development footprint for the proposed substation site once completed,
includes the substation platform, cut/fill embankments, access road, associated culverts,
Sustainable Urban Drainage System (SUDS) and OHL connecting down-leads and
towers. 
1.3. The site is located approximately 8 km southwest of the village of Claonaig in Argyll and
Bute, West Scotland and is 1 km from the Firth of Clyde. The Project would be accessed
from the A83 using existing private tracks known as the Cross Kintyre Haul Road and the
Cour Estate track. The Proposed Development is in an area of commercial forestry with
low conservation value, as well as an area of semi-natural broadleaved woodland with
higher ecological importance. It is situated approximately 1 km from the Firth of Clyde,
and approximately 500 m from the B842. 
1.4. Buildings will comprise steel portal frames with metal cladding and roof. There would be
some un-housed electrical switchgear and plant located within the platform area. The
substation would not be illuminated at night during normal operational activities.
Conditions will be imposed to ensure that appropriate materials and colouring are used in
respect of these buildings and other infrastructure. Flood lights would be installed but
would only be used in the event of a fault during the hours of darkness; or during the over-
run of planning works; or when sensor activated as security lighting for night-time access.
Details of any proposed floodlighting are subject to a condition. 
1.5. No physical or operational aspects of the previous application already approved by
Members will be altered by this S42 application which relates only to the wording of
condition 07. 
2. Consideration of Proposal 
2.1. Section 25 of the Town and Country Planning (Scotland) Act 1997 requires planning
applications to be determined in accordance with the development plan unless material
planning considerations indicate otherwise. The principle of development has been
established under the original permission and consequently, it is not necessary or
appropriate to revisit whether or not it is compliant with the settlement strategy. This is an
application to amend the requirements of the condition on an existing permission. In order
to address the determining issues, the key considerations are therefore: 
1. Compliance with the adopted Development Plan (s) and other planning policy 
Page 189

Page 190

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
2. Variation of the wording of condition 07 as proposed; and 
3. Any other material considerations 
3. Compliance with the Development Plan (comprising NPF 4 and LDP 2) 
3.1. The Development Plan has changed since the determination of the original application.
The Development Plan now comprises the adopted National Planning Framework 4
[NPF4], in addition to the adopted Argyll and Bute Council Local Development Plan 2,
2024 [LDP] and all statutory and supplementary guidance. 
3.2.  Although NPF 4 was formally adopted in Feb 2023 before the approval of 23/00382/PP
for the original scheme, LDP 2 was formally adopted in Feb 2024, since the proposal was
approved on 21.06.23.  Notwithstanding this, it should be noted that the original
application report of handling also considered the application against the policies of the
draft LDP 2 document, which have effectively been replicated in the adopted LDP 2 in
respect of the relevant policies. As approval of this current application would grant a fresh
planning permission for the proposals, it is necessary to address the relevant policy
framework for the application where the framework  differs from that of the previous NPF
4 and draft LDP 2 policy evaluation , in addition to addressing any relevant matters raised
by the  S42 application to amend Condition 07 and amend other relevant conditions which
the Planning Authority considers is necessary. 
3.3. As the proposals involve an amendment to an existing live consent, which has been
partially implemented at time of writing, there is no opportunity for the Planning Authority
to revisit the principle of the development, or any facets of the original permission that do
not form part of the proposed amendments.  Therefore, in this instance, the assessment
of the proposals relates solely to consideration of revisions to the wording of condition 07
as previously set out at Section P of this report. 
3.4. The main matters for the Council’s consideration are, therefore, whether the development
would continue to comply with the Development Plan (NPF 4 and LDP 2 policies) based
on the new suite of conditions.   
4.  National Planning Framework 4 
4.1 National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for Scotland. 
It sets out spatial principles, regional priorities, national developments, and national
planning policy.  NPF4 supports the planning and delivery of sustainable places, liveable
places, and productive places. As the proposal continues to seek permission for an
electrical substation to facilitate the transmission of existing and future renewable energy
projects within this part of Argyll and Bute, helping to tackle issues of climate change, it is
considered that the amended proposals continue to accord with the relevant policies of
NPF4. Of particular relevance is assessment against NPF4 Policy 5 – Soils, which includes
details on the approach required where development proposals would impact upon peat.
The amended application is considered to comply with NPF4 Policy 5. And importantly the
statutory consultee who requested the wording of condition 07 have raised no objection to
the proposed changes. The proposals therefore continue to comply with NPF 4 policy
requirements. 
5.  Argyll and Bute Local Development 2 
5.1. The original application was assessed against the policies of the draft Argyll and Bute
Local Development Plan 2, in addition to those of the adopted Argyll and Bute Local
Development Plan 2015. In terms of the minor changes to the previously approved and
conditioned scheme, consideration has been given to whether the proposals continue
Page 190

Page 191

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
to comply with the provisions of the current adopted Local Development Plan.  Following
a detailed assessment of the application against the relevant policies of the adopted
Argyll and Bute Local Development Plan 2, and in particular Policy 79 - Protection of
Soil and Peat Resources, it is considered that the amended proposals are acceptable. 
5.2. The detailed assessment of the S42 application has fully considered impacts on
international, national and local designations, impacts on carbon rich soils, deep peat
and priority peatland habitat, economic benefits, contributions to renewable energy
targets, effects on natural heritage and ecology, landscape and visual impacts,
cumulative impacts, public access, the historic environment, tourism and recreation,
road safety and traffic, hydrology, water environment and flood risk, and environmental
protection.   
6.0      Conclusions 
6.1  The proposed development remains exactly the same as that approved and currently
under construction under the original Planning Permission, with no changes to the site
layout, proposed buildings, infrastructure or access arrangements. Full details of the
proposed development originally approved are contained in the Report of Handling for
permission ref: 23/00382/PP and available on the public access system.     
6.2  On the basis of all of the above, the proposal is considered to be consistent with policies
in both the National Planning Framework 4 (NPF4) and the Argyll and Bute Local
Development Plan 2. Therefore, it is recommended that the application to vary condition
07 attached to planning permission 23/00382/PP is granted, which effectively renews
that planning permission for a further three years.   
Page 191

Page 192

This page is intentionally left blank

Page 193

Page 193

Page 194

This page is intentionally left blank

Page 195

ARGYLL AND BUTE COUNCIL                           PLANNING, PROTECTIIVE SERVICES AND
LICENSING COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH    23 OCTOBER 2024 
Government Consultations:  Building Regulations: Determining the principles for a
Scottish equivalent to the Passivhaus standard: Stage 1 consultation   
1.0 HEADLINES 
1.1 This report provides members of the Planning, Protective Services and Licensing
Committee with comments on a current Scottish Government consultation “Building
Regulations: Determining the principles for a Scottish equivalent to the
Passivhaus standard: Stage 1 consultation “ and seeks approval of a formal
submission 
1.2 The Scottish building regulations set minimum standards applicable to new buildings and
to new work to existing buildings. In December 2022, the then Minister for Zero Carbon
Buildings, Active Travel and Tenants’ Rights confirmed that, in response to Alex Rowley
MSP’s Proposed Domestic Building Environmental Standards (Scotland) Bill, the Scottish
Government would make subordinate legislation by 14 December 2024 to give effect to Mr
Rowley’s final proposal. The proposal was “to introduce new minimum environmental
design standards for all new build housing to meet a Scottish equivalent to the Passivhaus
standard, in order to improve energy efficiency and thermal performance”. 
1.3 This report provides a response to the consultation for consideration by members, prior 
to submission to the Scottish Government by the 23 October 2024 deadline. 
2.0     RECOMMENDATIONS 
2.1 It is recommended that members of the Planning, Protective Services and Licensing 
Committee consider the report and approve the response outlined in Appendix 1 
3.0      DETAIL 
3.1 The consultation is the first of two which will consider the technical, commercial, and wider
policy implications of improvements to building regulations in the context of broader action
by the Scottish Government on climate change, to further our ambition of becoming a net-
zero society by 2045. It does not set out the details of proposed new standards or
performance targets. That will be set out in a further consultation in summer 2025. Instead,
this consultation seeks views on the form and approach that a Scottish equivalent to the
Passivhaus standard, implemented through building regulations, should adopt 
3.2 The consultation seeks detailed responses on specific questions on the concept of a
Scottish equivalent and issues around specification and calculation tools. In summary,
Passivhaus seeks very high and assured levels of energy efficiency and a healthy and
comfortable indoor environment all year round. It encourages a design-led approach to
optimise built form to limit energy demand and meet the standard 
3.3 The proposed response (see Appendix 1) does not propose to answer the questions but
addresses the key issues in Argyll and Bute, namely the impact on affordability,
development costs and skills shortages, which are further exacerbated in rural and island
communities. 
3.4 A Passivhaus standard will increase building and development costs, requires specifically
skilled architects, developers, builders and contractors and the potential to hinder
Page 195 Agenda Item 10

Page 196

development. This will adversely impact on communities within Argyll and Bute, particular
our rural and island communities where previous studies (Stantec report “Argyll & Bute
Island Housing Market Study-  May 2024) have identified: 
(a) Local house prices exceed local household incomes, particularly on the
islands, and a high level of house sales are mode by non-residents as market
prices are unaffordable to local residents.
(b) The percentage of local people in our island communities unable to afford
average house prices ranges from 62% on Coll to 93% on Jura.
(c) The Scottish Government identifies an affordable house as no more than 3.5
times the annual incomes of an individual household. The ratio is significant
higher in Argyll and Bute, with the average house prices being between 4 and
5 times individual household incomes.
(d) In the 7 islands in the STATEC study over 50% of all residents were unable to
affords the average house prices and this is particularly acute in Jura and
Colonsay where only 1 in 10 have sufficient funds to purchase a residential
property on the island.
(e) The costs of building in Argyll and Bute are the highest on mainland Scotland
(only exceeded by Shetland) and building costs are 30-40% higher on the
islands. 
(f) Public sector investment is required to provide new high quality and energy
efficient houses, to address fuel poverty on the island. 
4.0 CONCLUSION 
4.1 Recognising the benefits of Passivhaus construction, the proposal for an absolute requirement
for all new developments will adversely impact development in Argyll and Bute and our rural
and island communities. This is at a time of a housing emergency, the proposals are likely to
hinder development, increase development and building costs and exacerbate our skills
shortages. Scottish Government should consider that if Passivhaus standards are absolute
standard additional financial support is required to support the higher development costs in
rural or islands communities. Without this, a relaxed standard must be developed as an
alternative, particularly for rural and island communities and for retrofits. 
5.0   IMPLICATIONS 
5.1 Policy – consistent with Council policies 
5.2 Financial – Proposals will increase development costs in Argyll and bute
5.3 Legal – None
5.4 HR – none.
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, 
5.5.1 Equalities – N/A
5.5.2 Socio-economic Duty – N/A
5.5.3 Islands – included in response
5.6 Climate Change – supports principles of climate change and energy efficiency 
5.7 Risk – Proposals may hinder delivery of Councils emergency housing action plan
5.8 Customer Service – N?A
5.9 Rights of the Child (UNCRC) – none 
Executive Director with overall responsibility for Development and Economic Growth: 
Kirsty Flanagan 
Policy Lead for Regulatory Services: Councillor Green. 
25/09/2024 
For further information contact: 
Alan Morrison, Regulatory Services and Building Standards Manager alan.morrison@argyll-
bute.gov.uk.
Fergus Murray, Head of Development and Economic Growth: fergus.murray@argyll-bute.gov.uk. 
APPENDICES – Appendix 1: Draft consultation response
Page 196

Page 197

Appendix 1 
Government Consultations:  Building Regulations: Determining the principles for a Scottish
equivalent to the Passivhaus standard: Stage 1 consultation   
1 Name of Consultation
Building Regulations: Determining the principles for a Scottish equivalent to the
Passivhaus standard: Stage 1 consultation  
2 Open date
31 July 2024
3 Closing date
23 October 2024
4 What is the consultation? 
Scottish building regulations set minimum standards applicable to new buildings and to
new work to existing buildings. In December 2022, the then Minister for Zero Carbon
Buildings, Active Travel and Tenants’ Rights confirmed that, in response to Alex Rowley
MSP’s Proposed Domestic Building Environmental Standards (Scotland) Bill, the Scottish
Government would make subordinate legislation by 14 December 2024 to give effect to Mr
Rowley’s final proposal. The proposal was “to introduce new minimum environmental
design standards for all new build housing to meet a Scottish equivalent to the Passivhaus
standard, in order to improve energy efficiency and thermal performance” 
This consultation is the first of two which will consider the technical, commercial, and wider
policy implications of improvements to building regulations in the context of broader action
by the Scottish Government on climate change, to further our ambition of becoming a net-
zero society by 2045. 
This consultation does not set out the details of proposed new standards or performance
targets. That will be set out in a further consultation in summer 2025. Instead, this
consultation seeks views on the form and approach that a Scottish equivalent to the
Passivhaus standard, implemented through building regulations, should adopt 
5 Why are they consulting?
This stage 1 consultation seeks views on the form and approach that a Scottish equivalent
to the Passivhaus standard, implemented through building regulations, should adopt. It
also seeks information on the implementation of the 2023 energy standards to inform the
development of a stage 2 consultation in 2025, which will set out the details of proposed
new standards or performance targets
6 Officers consideration and recommendations 
The consultation asks detailed questions on the concept of a Scottish equivalent and
specific issues around the specification and calculation tools. The concept is. 
“In summary, Passivhaus seeks very high and assured levels of energy efficiency and a
healthy and comfortable indoor environment all year round. It encourages a design-led
approach to optimise built form to limit energy demand and meet the standard 
Proposed response: 
The consultation asks very specific questions and rather than focusing on these, due
consideration has been given to identify potential issues and risks associated with
introducing a Passivhaus equivalent standard to developments within Argyll and Bute 
In developing this consultation response, reference is made to the Stantec report “Argyll &
Bute Island Housing Market Study- May 24” and the following evidence: 
Page 197

Page 198

(a) Affordability’ Local house prices exceed local household incomes,
particularly on the islands, and a high level of house sales are mode
by non-residents as market prices are unaffordable to local
residents.
(b) The percentage of local people in our island communities unable to
afford average house prices ranges from 62% on Coll to 93% on
Jura.
(c) The Scottish Government identifies an affordable house as no more
than 3.5 times the annual incomes of an individual household. The
ratio is significant higher in Argyll and Bute, with the average house
prices being between 4 and 5 times individual household incomes.
(d) In the 7 islands in the STATEC study over 50% of all residents were
unable to affords the average house prices and this is particularly
acute in Jura and Colonsay where only 1 in 10 have sufficient funds
to purchase a residential property on the island.
(e) The costs of building in Argyll and Bute are the highest on mainland
Scotland (only exceeded by Shetland) and building costs are 30-
40% higher on the islands. 
(f) Public sector investment is required to provide new high quality and
energy efficient houses, to address fuel poverty on the island. 
General:
1. In general terms, the principles for a Scottish equivalent to the Passivhaus standard
are sensible from sustainability and climate change perspectives, However, it’s
important to recognise the potential negative impact to rural areas, in terms of
development costs, particular where building costs are presently significantly higher in
Argyll and Bute, and more so in island communities, and unaffordable to many local
residents.
2. Energy efficient properties are critical, but the consultation should consider whether the
Passivhaus standard is appropriate standards to apply to all new buildings and
propose other alternatives, rather than it being an absolute requirement.
3. Passivehaus approach does offer opportunities in areas of electricity grid
restrictions.  There are many places where it is currently very challenging to get a grid
connection due to lack of capacity.  In these circumstances, Passivhaus may offer an
opportunity to reduce impact on the grid, subject to discussion with network
suppliers.  In circumstances where this is required, consideration should be given for
grant funding to achieve this. 
Costs: 
4. The proposal to introduce a Passivhaus standards to all new developments will result
in a significant cost burden on all housing within the Argyll and Bute area and in
particular, remote and rural communities as evidenced in the STANTEC report . The
cost implications of achieving this as a minimum standard must be carefully
considered, particularly in a time of housing emergency In Argyll and Bute.   
5. The proposals are likely to adversely impact development and further assessment is
required on the impact in Argyll and Bute, particularly where building costs in Argyll and
Bute are the highest on mainland Scotland and are only higher in Shetland. 
6. The infiltration rate of 0.6 air changes per hour far exceeds the current air changes that
are currently achieved, will require a greater level of site supervision, contractor
experience, and attention to detail, which comes at additional cost for the client. The
entire design through to the completion phase appears to be far more onerous than
current construction practice, which again will have significant cost implications on the
client for all members of the design team and construction professionals involved in the
project. 
Skills and expertise
Page 198

Page 199

7. The Passivhaus is not a building that can be designed by an agent with no credentials
in this type of building and thus requires a professional with experience of Passive
House Planning Package (PHPP) and over seen by a Passivhaus certifier. 
8. We raise concerns over the level of competence that would be required by the
professionals required to undertake the design, construct and carry out site supervision
in complying with a Passivhaus design. Such skills shortage will hinder developments
and increase costs. These will be amplified in remote rural area 
9. Ventilation and heat exchange systems need maintenance and available contractors to
do this in remote rural areas at reasonable cost and in reasonable time. As an
example. There are already issues accessing gas safety and electrical safety
engineers in rural authorities. 
Changing behaviours
10. Passivhaus Buildings work efficiently when occupiers are bought in to the concept and
behave and utilise the building in an appropriate way. Education of occupiers is critical
as people may override the design by installing additional heating or not use the
mechanical ventilation system. 
Other 
11. Further consideration is required on how this proposed standard impacts on the drive
to District Heating and LHEES. The benefits of a cost effective heat network for new
developments will not be required to the same extent if the Passivehaus standards are
applied universally to all developments.  Will this not be a long term disincentive to
pursuing heat networks in contrast to other SG policy and now Local Heat and Energy
Efficiency Strategies (LHEES).
12. Whatever standards are chosen they should not be different dependent on tenure, ie:
social housing should be at the same standard as private, not higher or lower.
13. The Stage 2 consultation should consider if this standard is more appropriate as an
option rather than an absolute standard, and identify suitable alternatives which would
still meet the drive for energy efficiency in new developments. 
7 Recommendations 
The consultation recognises that the costs of Passivhaus are higher in rural areas and
states “Passivhaus is a significant upgrade on the current carbon emitting criteria of our
existing buildings, but this comes at a significant cost to the client and in particular those
that live in more rural and remote areas where travelling and a lack of suitably qualified
and experienced professionals, will incur additional costs as opposed to the central belt”. 
Argyll and Bute raise concerns over these proposals as , without significant public sector
development and support grants, the proposals exacerbate the existing issues of lack of
affordable housing to residents, high building costs and skill shortages, particularly within
our rural and island communities 
Scottish Government should consider that if Passivhaus standards are absolute standard
additional financial support is required to support the higher development costs in rural or
islands communities. Without this, a relaxed standard must be developed as an alternative,
particularly for rural and island communities and for retrofits. 
Page 199

Page 200

This page is intentionally left blank

Page 201

ARGYLL AND BUTE COUNCIL                           PLANNING, PROTECTIIVE SERVICES AND
LICENSING COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH    23 OCTOBER 2024 
REGULATORY SERVICES PERFROMANCE REPORT 2023-24 
1.0 HEADLINES 
1.1 This paper updates members of the Planning, Protective Services and Licensing Committee on
the progress which has been made to deliver the Regulatory Services Service Plan 2023/25,
highlighting achievements and performance in 2023-24, and identifying additional priorities for
the forthcoming year. The Regulatory Services- Service Plan 2023-24 was approved by PPSL
Committee on the 21 June 2023 
1.2 Regulatory Services consists of the multifaceted areas of environmental health, animal health
and welfare, licensing standards, private landlord registration and short-term let licensing. These
statutory services aim to protect public health and public safety and secure compliance with
legislation and standards. Environmental Health is the branch of public health which deals with
all aspects of the natural and built environment that may affect public health, together with animal
welfare and licensing duties. 
1.3 Regulatory Services is significantly under resourced and there is a national shortage of qualified
environmental health professionals. For much of the reporting period (1 April 23 to 31 March
2024), there were up to 9 vacancies across the service including 4 Environmental Health Officers,
and another 3 operational staff. As a result, the service has had to focus resources on higher
priority areas of work, at the expense of lower priority and other work that we are unable to deliver
and undertook a demand reduction exercise to manage our reactive workload more effectively, 
Notwithstanding, there has been good progress in delivering the service plan priorities and our
key performance measures although the plans do not include all the statutory work that is
expected of Regulatory Services. Special recognition should be given to the team for carrying
out this work, under extreme pressure. 
2.0     RECOMMENDATIONS 
2.1 It is recommended that Members of the Planning, Protective Services and Licensing
Committee:  
(a) Consider and note the achievements and performance by Regulatory Services in
2023/24.
(b) note the Service is operating circumstances and recruitment difficulties, the continued
need to direct resources to high priority activities, and to secure appropriate resources 
3.0      REGULATORY SERVICES- SERVICE PLAN 2023-25 
3.1    Regulatory Services is an enforcement service aimed at ensuring that the legislative standards
are met by businesses and the public, as appropriate, across a wide range of disciplines. Our
enforcement ethos is to work with others to secure these improvements through the provision of
advice and information. Any enforcement is risk-based and proportionate to the risk to public
health or safety, the risk of consumer detriment, non-compliance with statutory notices or where
there is evidence of non-cooperation in meeting statutory requirements. 
Page 201 Agenda Item 11

Page 202

3.2    The Regulatory Service Work plan 2023-25 details the wide remit of the service, challenges and        
priorities and key performance targets for this period. Delivery of this overarching plan is            
dependent upon available resource and references a range of statutory plans including the Food 
Law Enforcement Plan, Health and Safety Law Enforcement Plan; Animal Health and Welfare        
Plan and NHS Highland/Argyll and Bute Council/Highland Council Joint Health Protection Plan. 
3.3   Recruitment issues and operating with up to 20% of our qualified Environmental Health Officer
resource for 23/24, has affected our performance and resulted in high risk priorities being targeted
in the first instance. Due to the excellent work of the Regulatory Services team and their ongoing
commitment, in difficult circumstances, there have been some significant achievements in 23/24,
against the Regulatory Services- Service Plan 2023-24. Appendix 2 provides a summary of
progress against the plan activities. 
3.4   We have not delivered all aspects of the plan, due to a high reactive workload, including an increase
in service requests and incidents. As a result, resources have been redirected to respond to the
reactive workload, at the expense of planned activities. However, it’s worthy to highlight the
following achievements 
i. Performance measures. Good performance against our key measures. 
Key National  Performance Measure 2023/24
Target 
2023/24
Actual 
Percentage of service requests resolved within 20 days- EH 75% 73%
Percentage of service requests resolved within 20 days-
Regulatory Services
75% 88%
Percentage of planned high risk visits (e.g. food safety, animal
health and welfare, licensing standards) completed
90% 90% 
ii. We have introduced a new management team, which is working well. 
iii. Service design. Completed and implemented a service redesign to address a 
range of issues with the previous operating model. It has reflected changes to 
service demands, new legislation, working practices (post COVID) and outcomes 
from staff engagement. It also future proofs the service embracing opportunities for
new working arrangements and the use of technology. A new structure, which 
included minor changes to management arrangements, and the creation of a 
new Principal Officer role (replacing existing Lead Officer Roles), is in place and 
good progress is being made to provide a range of measures intended to deliver the 
review outcomes. The review was undertaken within the existing revenue budget. 
iv. Completed a demand reduction exercise to identify whether there are more efficient
ways of responding to specific service requests and in some cases, find alternatives,
and also not responding where the issue is low risk or outwith our remit, whilst
providing appropriate information to enquirers. Reactive work detracts the team from
planned activities and across the whole of Regulatory Services last year, we received
in 4412 requests for service (excluding short-term let licensing and private landlord
registration). This compares to 4555 for the same period in 23/24, although there was
a 48% reduction in export health certificate requests and a 12% increase in the more
resource intensive general environmental health service requests. 
v. Despite considerable efforts to recruit suitably qualified Environmental Health Officers
to fill vacant posts, the Council have been unable to fill vacant posts, with some posts
being vacant for 12-18 months. This situation is exacerbated by the national shortage
of Environmental Health Officers in Scotland, increased competition to recruit to
vacancies by other local authorities (some of which offer higher salaries) and a
reducing number of young people entering the profession. Whilst we are actively
participating in national work with the Society of Chief Officers of Environmental
Health in Scotland, Royal Environmental Health Institute of Scotland (REHIS),
Page 202

Page 203

Scottish Government and educational establishments, any outcomes are unlikely to
be evident in the short-term. 
vi. Given the national shortage of qualified Environmental Health officers and inability to
recruit, we developed a new career pathway for environmental health. This enables
individuals, with suitable training, to be appointed and to undergo a structured training
program/qualifications to progress from Graduate to Regulatory Services Officer to
Environmental Health Officer, whilst carrying out an operational workload. We have
recruited 2 new employees through this route as Regulatory Services Officer and
discussions are ongoing with an existing employee to embark on this career pathway. 
vii. Food Safety. Reinstated a food control program focussing resources on the approved
sector (i.e. manufacturers and exporters) and premises that serve vulnerable groups
such as schools, hospitals and care homes. However, we have not restarted food
interventions to general food premises 
viii. Health and Safety, Proactive inspection programme in three areas: bather safety in
swimming pools; the risk of infection from animal contact establishments; and a
sample of 20 spa pools and hot tubs. Seven enforcement notices have been served
to address non-compliance. 
ix. Public Health, work continues in reviewing the National Guidance for investigating
lead failures in relation to water supplies and implementing any changes required. We
have reviewed and replaced as necessary, all signs and advice regarding Blue Green
algae blooms in inland lochs. Recent appointment of the Principle EHO Public Health
to the vacant post we enable us to review and prioritise actions from the Joint Health
Protection Plan, investigations into cases of infectious disease in conjunction with
NHS Highland. 
x. Private Water supplies: Implemented our PWS Improvement Action Plan and
completed 129 risk assessments and carried out monitoring and sampling visits
across 449 of our 764 regulated private water supplies (increase in regulated supplies
from 562). These visits led to 308 investigations where results failed to meet
prescribed drinking water quality standards.  The number of monitoring visits has
fallen this year slightly (from 500 in 2022) as we targeted an increase in risk
assessments from 10% to 18%, but performance was affected by due to staff illness
and absence. 
xi. Housing related activities. Resources in the Landlord Registration team were reduced
to 50% despite repeated attempts to recruit. We continued to process registration and
Houses in Multiple Occupation Licence applications. Area teams continue to respond
to potential Statutory Nuisances as they relate to Housing conditions. In addition
recent changes to the Repairing Standard in relation to lead pipework in contact with
water supplies has meant increases in enquiries. 
xii. Animal Health and Welfare; Completed the review of the Animal Health Disease Plans
and implemented appropriate measures locally, in response to the national avian
influenza outbreak. Promotion of the new Scottish Kept Bird Register, which came
into place on 1/9/2024 and required all keepers of birds with access to the outside
environment to register their keeping of birds, irrespective of numbers kept. 
xiii. Licensing Standards. Completed 100% of their high risk inspection program of
licensed liquor premises, responded to 777 occasional and extended licence
applications, issued 144 welcome packs to new licensees, and responded to 1781
service requests 
xiv. Short–term let licensing. The tourism sector is critical to the economy of Argyll and
Bute and this has led to a large volume of short-term let licences. Implementation of
the Scottish Government scheme has been difficult and this has involved the reaction
Page 203

Page 204

of a new team and given the temporary nature of this work, recruitment has been
problematic. At the time of writing the report, there are over 3200 applications and the
team have carried out excellent work, with 1013 licences issued. 
xv. Incidents: Responded to a variety of incidents including the investigation of a fatality
at a leisure centre, major injury to an employee, hazardous substance consent,
contaminated land issues and the national avian influenza outbreak affecting wild and
domesticated birds. In Argyll and Bute, there were no reported outbreaks associated
with domestic or commercial poultry 
xvi. Growing our own: Developed a new career pathway to Environmental Health whereby
suitably qualified officers can be recruited into a Regulatory Services role and
provided with appropriate training to become an Environmental Health Officer. Been
successful in establishing a new EH management team in 2024 with the internal
promotion to the Environmental Health Manager (West) post, and other employees
taking up promoted, different or acting-up, posts within Regulatory Services.
However, our recruitment difficulties are demonstrated by our inability to attract a
suitably qualified candidate for the post of Graduate Environmental Health Officer,
with a starting salary of £31,990 and a commitment to provide support and specialist
training to attain the professional REHIS post graduate Diploma in Environmental
Health, to become a qualified EHO 
3.5 Challenges and issues facing Regulatory Services for 2024/25 are: 
3.5.1 The service is not adequately resourced to undertake all its statutory responsibilities and work is
assessed in a risk-based, proportionate approach having regard to public health. This is
reflected in the service plans and priorities, exacerbated by recruitment difficulties in attracting
qualified officers and high levels of vacancies, and external audits (Food Standards Scotland
2016, Scottish Government Drinking Water Quality Regulator 2022). 
3.5.2  Managing risks: Regulatory Services continues to be under-resourced to deliver the Councils
full statutory duties across environmental health and animal health and welfare. Our
enforcement policy targets resources on high risk priorities, and intelligence-directed
activities and this will continue.  Whilst, a pragmatic approach to protecting public health, it
does expose the Council to reputational damage as there is statutory work not being carried out
and this potentially increases the risks of non-compliance and incidents, places a greater
emphasis on businesses to manage their businesses safely, and public concerns that
environmental health no longer respond to various issues, with an expectation that they consider
their own civil actions. External audits will identify that the Council have insufficient resource to
deliver statutory duties across Regulatory Services 
3.5.3 Recruitment and resources: 
Our aim is to recruit to our vacant posts and achieve a full staffing complement. We have
implemented a new career structure, redesigned posts and are working with our HR
colleagues, to identify innovative ways of tacking this historic issue. 
Work is planned to identify the resource gap that exists between the current service and an
appropriately resourced service, as this is unknown. In food safety(which is currently under-
resourced by 3 FTE), we have calculated that we require an additional 5.5 FTE professional
posts, above our current full complement and budget, Review existing vacancies and identify
whether there is an alternative way of delivering services within the existing budget. For
example, in private water supplies, appointment of new officers at a lower level post to
complete training for risk assessment work; appointing an additional temporary member of
staff to assist in addressing the increase in supplies funded from an increase in income 
Page 204

Page 205

3.5.4 Service redesign: To continue to work towards delivering all actions identified through service
redesign and meet the 11 outcomes. This includes actions relating to communication, bedding
in the new management and Principal Officer remits. Better use of digital systems and
identifying ways of finding additional capacity, through improving our effectiveness through new
ways of working and use of digital technology 
3.5.5 National shortage. Participate in national discussions to address the shortage of qualified
environmental health professionals and support local and national initiatives to promote
environmental health as “a career of choice”. This includes promotion within schools and
recruitment of a Student EHO, subject to the availability of a degree course, and internal
resources to train them during their period of workplace attendance. 
The decision by the University of the West of Scotland not to accept new students into Year 1
of the BSc (Hons) degree course in Environmental Health (the only one in Scotland) in
2024/25 and 25/26 poses a significant risk to the profession and has delayed our ability to
recruit a Student EHO, from the local community, that we could sponsor and support to
become an EHO in the future. 
3.5.6 Short-term let licensing: There are considerable challenges in assessing more than 3200
applications, due to resourcing difficulties and workload. All applications not determined within
12 months, are deemed granted, and the service is presently developing its strategy to deal
with deemed licences and have communicated with the sector that applicants can continue
operating meantime. Specific actions include the review our STL policy to take account of
revisions to legislation, the deemed grant process and continue to determine the remaining, and
new, applications for licence. Further work requires to be carried out to develop an enforcement
program for licensed premises and to participate in consideration of potential Short-term let
Planning Control Areas 
4.0 CONCLUSION 
4.1 The Council’s Regulatory Service continues to deliver its statutory duties with a continued focus
on high risk work and intelligence- led interventions, at the expense of other statutory work. This
manages public health risks but risks placing a greater emphasis on businesses to manage their
businesses safely, and public concerns that environmental health no longer respond to various
issues. Improvements can only be achieved through recruitment to vacant posts and additional
funding. 
4.2 The team worked hard in 2023/24 to deliver service priorities, as well as responding to high levels  
of unplanned work, and carrying out a service review 
5.0   IMPLICATIONS 
5.1 Policy – consistent with Council policies for protecting public heathy, better regulation and safer
communities
5.2 Financial – Service operating within budget
5.3 Legal – statutory service under the Building (Scotland) Act 2003 and associated legislation.
5.4 HR – there are significant recruitment issues affecting the service at a local and national context. 
5.5 Fairer Scotland Duty - the Fairer Scotland Duty, 
5.5.1 Equalities - all activities comply with all Equal Opportunities/Fairer Scotland Duty
policies and obligations.
5.5.2 Socio-economic Duty - all activities have complied with the council’s socio-economic
duty.
5.5.3 Islands – interventions have been delivered across the Argyll and Bute area, including
island communities.
5.6 Climate Change – work of service supports climate change and net zero 
5.7 Risk – Council is not meeting its full range of Regulatory Services statutory duties and is
Page 205

Page 206

managed in a risk-based targeted, proportionate approach. This increases the risk of external
government audits identifying that the services are not fully resourced, reputational damage,
and responding to incidents, rather than prevention
5.8 Customer Service – service seeks to meet the Councils customer standards is a front-facing
regulatory service
5.9 Rights of the Child (UNCRC) – none 
Executive Director with overall responsibility for Development and Economic Growth: 
Kirsty Flanagan 
Policy Leads for Regulatory Services: Councillor Green. 
02/10/2024 
For further information contact: 
Alan Morrison, Regulatory Services and Building Standards Manager alan.morrison@argyll-bute.gov.uk.
Fergus Murray, Head of Development and Economic Growth: fergus.murray@argyll-bute.gov.uk. 
APPENDICES
Appendix 1: Key achievements and service activities
Appendix 2:  Progress report against Regulatory Services Service Plan 2023-25
Page 206

Page 207

Appendix 1: Key achievements and service activities 
Page 207

Page 208

Appendix 2:  Progress report against Regulatory Services Service Plan 2023-25   
Priority Progress report August 2024 Status
1 General management 
Continue general review of approach to work to improve
effectiveness and efficiency (redesign). Including: 
Positive progress being made to deliver this outcome 
Service Management: To recruit an Environmental Health
Manager (West) and build a new management team. 
Recruited to Environmental Health Manager (West) post and new management
team working well 
Recruiting to vacant posts Significant issues recruiting qualified EHO’s, not assisted by national shortage (3
EHO vacancies with one since April 2023) 
Workforce planning: Continued focus on workforce
planning and how to recruit, retain and develop our own
workforce to combat the national shortage of
environmental health and other regulatory professional
staff. 
Introduced new career pathway to Environmental Health Officer to reflect national
shortage of Environmental Health Officers through recruitment of suitable qualified
candidates to Regulatory Services Officer post and career development to EHO.
Presently 2 new employees employed in this route. Continued resourcing and
recruitment issues. 
Good evidence of “growing our own” in all posts, with exception of EHO 
Service redesign. Complete the redesign of regulatory
services to provide a service reflecting available
resources, support succession planning, workforce
development; demand management, and appropriate to
meet future challenges
Service redesign complete and Implementation Plan in place. Revised structure in
place as of 12 August 2024 
Performance: Review and develop improved methods of
monitoring performance across all areas of work as part
of the development of the performance framework, linked
to resources;
Performance review ongoing but model agreed to review and prioritise workload
across the service 
Supporting Procedures: Clear & consistent work
procedures to improve efficiency and avoid duplication of
effort;
Revised procedures to be taken forward in 24/25 as part of new arrangements,
post service review 
ICT & Business Support: Continual improvement in use of
digital technology to reduce administrative burdens and
free up officer resources (e.g. MS365; 
remote inspections will reduce travelling etc) through
better use of digital technology. Specific projects include
the migration of electronic document management
system, better use of MS365, continued transfer from
paper-based or site-specific files to electronic documents; 
Electronic Document Management program and transition of MS365 ongoing.
Linked to office rationalisation, data cleansing work ongoing. Introduced new
Enterprise system to support officers manage their workloads more effectively. 
Page 208

Page 209

Officer Development: build capacity by improving learning
and development process for officers; and the successful
training of graduate environmental health officers and
authorised food safety officers 
New career conversation process introduced to support professional and personal
development across Regulatory Services. Recruitment difficulties in recruiting
graduate EHO/Food Safety Officer but to be pursued in 24/25 
Outcomes: Continue to demonstrate benefits and improve
profile of work undertaken with greater use of
opportunities of case management system reporting. 
Ongoing but outcomes not yet achieved due to delays in EDMS project 
Savings & Income: Increase income & identify further
commercial opportunities and savings as part of Councils
financial strategy 
Post EU Exit, there has been a significant reduction in Export Health Certificate
work, and income, because of businesses changing their operating models.
Shortfall of £100K annually.  Benchmarking of fee and charges planned for 24/25
as part of budget process 
Where resource permits, work with other Council teams
and external housing organisations/partners (e.g. Under
One Roof, Shelter, Building Standards, Housing etc) to
provide opportunities to engage with homeowners and
landlords on housing standards and signpost to available
support    
Lack of resource to develop this but this matter is incorporated within the Councils
Housing Emergency Action Plan 
2 Health & Safety at Work Enforcement   
To develop and deliver our Health and Safety Law
Enforcement Workplan 2023-25. 
Health and Safety Law Enforcement Plan 23-25 approved by PPSL Committee on
23/09/2023 meets the requirements of LAC67/2 (rev 12), tailored around our
available resource. Work in progress to develop the plan 
To devise and deliver a programme of health and safety
interventions based upon Local Authority Circular
(LAC67/2) (rev12), and the list of national priorities
published by the HSE.  The programme shall consist of
work to deliver those national priorities set by HSE, work
to deliver local priorities and an inspection programme
that meets the requirements of the National Local
Authority Enforcement Code. All pro-active health and
safety work is targeted in accordance with the HSE
priorities or where local intelligence identifies any health
and safety related issue.   
Certain work-related incidents are reportable under the Reporting of Incidents,
Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR). Reports are
screened according to approved criteria and those occasioning serious harm or
indicating a significant breach of duty are selected for investigation. In 2023-2024
there were 23 reports received, of which 5 were selected for investigation. 
To resource and provide an effective response to serious
work-related incidents, including, where necessary,
preparing and submitting reports to the Crown Office
Procurator Fiscal Service
Work-related deaths are also investigated by Police Scotland, and our inspectors
work closely with the Police and the Crown Office from the outset in these cases.
One report was submitted to the COPFS in the period to date, relating to a
workplace transport incident. The outcome of that report is not yet known.
Incidents currently under investigation include: a fatality at a leisure centre; and a 
Page 209

Page 210

fatality involving an off-road vehicle. 
To provide appropriate advice and information to
employers and other duty-holders on securing the health,
safety, and welfare at work of their employees and the
health and safety of other persons affected by the conduct
of their undertakings. 
Advice on health and safety at work is provided on the Council’s website.2 b)
Inspectors respond to requests for advice from employers and other duty-holders.
c) On 17th August 2019, 24-year-old Kieran Cowan died after the unsafe boat
hired to him capsized in previously forecast strong winds and high waves on Loch
Awe. In January 2023, Clifford Davies and Janet Lightbown, the partners in Loch
Awe Boats, were jointly fined £10,000 when they pled guilty to a breach of section
3(1) of the 1974 Act resulting in the death of Mr Cowan.3 The investigation by
Argyll and Bute Council found that customers had been exposed to risks through
hiring out a boat which failed to comply with the stability and safety requirements
of the Hire Boat Code. Because of this incident, health and safety inspectors have
been scrutinising safety documents and procedures submitted with boat hire
licence applications and providing advice to the Licensing team to improve the
protection of boat-hirers, most of whom will be unfamiliar with boats. Particular
attention is being paid to the suitability and use of personal flotation devices
provided to members of the public. 
To maintain the competence of the appointed health and
safety inspectors to identify and intervene on matters of
evident concern when undertaking other regulatory visits
to premises. 
Key projects include: 
• Building safety hazards arising from fragile roofs and
unsafe shop signs; 
• Infection hazards from animal contact in the
commercial leisure sector; 
• Safety of inflatable amusement devices; 
• Gas safety in catering premises; 
• Carbon monoxide from solid fuel catering appliances;
and 
• Legionella control in spa pools in commercial use. 
Regular in-house training is provided to inspectors, and they can attend external
courses and webinars which are appropriate to their duties. An emphasis is put on
the skills required for criminal investigations and reporting to the Crown Office.
Inspectors are expected to deal with matters of evident concern relating to
workplace health and safety when conducting other duties in premises for which
the Council is the enforcing authority. Examples of cases dealt with include: 
a. exposed 415V electrical conductors in linen cupboards in an hotel
exposing employees to the risk of electric shock, burns and
electrocution; 
b.  damaged asbestos pipe lagging in an hotel basement exposing
employees to asbestos fibres;
c. an unguarded industrial fan used to ventilate a shop exposing
members of the public, and particularly children, to the risk of
amputation; 
d. unguarded planetary mixers in a catering premises exposing
workers to the risk of serious personal injury;
e. failure to maintain gas installations in a safe condition in catering
premises, exposing employees to the risk of exposure to carbon
monoxide.
16 improvement notices, 5 immediate prohibition notices, and 2 deferred
prohibition notices were served in the period to August 2024. 1 prohibition and 1
improvement notice remain under appeal to the Employment Tribunal. 
Page 210

Page 211

3. Licensing enforcement and administration   
To deliver the licensing scheme for short term let
accommodation. 
hort term let licensing regime is in place, together with STL Policy, which was
revised by Council in September 2023. New team in place to deliver this scheme,
although there have been resourcing issues in recruiting suitable qualified staff to
these roles. Significant challenge to process and determine more than 3020
applications. 
To review the arrangements for maintain a public register
for all licences administered by Regulatory Services and
develop a new suite of on-line public registers for all such
licences 
New in-house Oracle information management system in place to support the STL
regime and to produce the statutory public register which is available via the
website. An initial review of all licences issued by Regulatory Services and public
registers is planned in Q3/4 of 24/25. Public Registers of Licences issued by
Environmental Health and Animal Health are available on the Councils Website. 
To complete the review of all Council licensing functions
with the aim of improving their effectiveness and identify
any efficiencies
Review of licensing functions across Regulatory Services has been
reprogrammed for 25/26, given significant challenges in meeting demand from
STL licensing regime 
4, Private Water Supplies 
Review the charging fees for private water supply related
work. 
Fees and charges to be reviewed in 2024/25 on recruitment of the Principal EHO
post, which has been vacant for 12 months pending outcome of service redesign 
Continue to use a risk-based system approach to the
prioritising of the PWS monitoring and refocusing our risk
assessment programme on regulated /commercial
supplies. 
Risk assessment program has been focussed on regulated/commercial supplies
but progress in delivering the plan has been delayed due to staff absence and
vacancies. One existing part time post has been provided with additional hours
and two new Regulatory Services Officers have been recently appointed, training
is ongoing, and this will improve performance over 24/25 
Deliver the PWS Improvement Action plan which was
developed to address the outcomes of the DWQR
Supervisory visit in 2022
This plan was developed and resulted in an increase to completed risk
assessments from 55 (total up to 2022) to 129 (total to July 2023) this is a
significant increase over the year but was accompanied by a reduction in sampling
work (96% of supplies (500/552 supplies) in 2022, and 58% (449/764 supplies) in
2024. It should also be noted that the total number of supplies also increased in
2023 from 552 to 764 regulated supplies. Positive progress agreed with DWQR,
and plan extended for 24/26 regarding RA activity at expense of sampling. 
The impact of legislative changes in 2017 and statutory
obligations on the Council to monitor and regulate private
water supplies is its area has placed additional workload
and resource requirements on the team. A review of
workload and resources to be completed in 2024 to
identify the resources needed to meet our obligations and
provide a sustainable workforce going forward. 
Additional temporary, sampling post agreed for 2024/5 to progress sampling as
well as enable continued focus on risk assessments, following absences in wider
team. Further review planned for 25/26 to consider routine workload following
additional supplies being identified to cover both long-term lets and an increase in
STL’s notified due to licensing requirements. 
Page 211

Page 212

Continue to work in partnership with NHS Highlands
concerning reports of illness with links to PWS. 
Effective arrangements are in place between Council and NHS Highland, through
our Joint Health Protection Plan 24/26 
Advise, educate, and promote the private water supply
grant funding scheme so that supplies are improved to
provider safer drinking water. 
This work is ongoing and continues although uptake has slowed. In 2023/4 25
grant applications were received for carrying out improvements, 9 applications
were approved to go ahead and 6 were paid out. Since 2006 over £2.2m has been
paid for improvement to PWS within Argyll and Bute. 
Review the Council’s PWS Grant Policy to look at the
eligibility criteria for hardship and consider enhanced
funding for supplies that experience prolonged water
scarcity and/or lead contamination
This work has been delayed due to vacant lead officer post. Successful
recruitment was carried out in August 24 and the work will be reprogrammed into
work plan for 24/25 
Complete digitisation of all PWS paper files onto the
environmental health electronic document management
system. Review the existing PWS registers to enable
production of a single Register, and update PWS layers
on GIS to reflect properties served and NGR types
Digitation of PWS files is ongoing as is the review of the public register.
Identification of a suitable scanning company is required and had been anticipated
to take place at some offices that had undergone our modern workspace changes,
but this has not yet occurred 
5 Food Control   
To secure Committee approval for our Food Law
Enforcement Workplan for 2023-2025 and implement
measures to deliver it. 
Food Control Law Enforcement Plan 2023-25 approved by PPSL Committee on
18/10/2023. Work in progress to develop the plan 
Continue to work with Food Standards Scotland on the
review of the approach to Food Control following the
pandemic. The Service is also engaged in an emergent
national Scottish Authorities Food Enforcement Rebuild
(SAFER) project to redesign the approach to Food
Control applying limited resources to maximum effect and
in the longer term to provide assurance in public health
protection, with sufficient and sustainable resources to
deliver the required work. The review may include a novel
approach to publication of inspection information
Scottish Local authorities, including Argyll and Bute Council, continue to work with
Food Standards Scotland to support work on the Scottish Authorities Food
Enforcement Rebuild (SAFER) project. There is no update to provide meantime
and FSS continue to lead this project 
Review demand from export food business for export
health certification and attestations to identify resourcing
requirements and the financial implications from new
business trading models which are focussing on
commercial hubs established post EU Exit. 
Demand for export health certificates has fallen significantly post EU Exit as
businesses have changed their operating models. The larger export companies
are using the benefits from commercial hubs rather than seeking certificate from
each local authority. The impact from Argyll and Bute has been exacerbated by
Loch Fyne Oysters decision to move their smokery process outwith the area. To
illustrate this situation, in 2021/22, Argyll and Bute issued 1470 export health
certificates with total income of £137,817.70. For the same period in 23/24, 433
export health certificates were issued with an income to the Council of £40,639.20 
Page 212

Page 213

Food Control – Inspection Priorities 
It must be noted that investigations, or enforcement
action, significant to public health will take priority over the
targets specified below.   
Priority 1: High Risk Food Program 
To undertake Official Control Verification completing
verification of all *Critical Control Points, *Operational
Prerequisite Programmes, *Traceability, *Authenticity and
*Integrity arrangements within all Approved and other
High-Risk Food Business Operators. (Target 95%)   
Priority 1: High Risk Food Program 
We have implemented in a programme of visits to all premises requiring official
controls, and in addition have commenced a programme of high-risk premises
serving the most vulnerable groups. This project started in March 2024 and is
planned to finish September. There was a delay due to loss of some resources
however, posts have been advertised and are in the process of being filled/filled. 
Approved Food
Premises
(Priority 1)
Other High Risk Food Premises
(Vulnerable Group Project and other
intelligence lead inspections
No of high risks
interventions
planned 
49 27
No carried out 39 27 
Priority 2: Mid-range Risk Food Program (Intelligence
Informed) 
To establish based on intelligence an inspection
programme applied to medium risk Food Business
operators which may require a formal intervention and
integrate them into an inspection program to be carried
out by authorised officers of the Council or appointed
contractor. 
Priority 2: Interventions work ongoing but limited due to resourcing, to food
businesses providing to vulnerable groups (schools and residential homes for eth
elderly) work ongoing but limited due to resourcing, to food businesses providing
to vulnerable groups (schools and residential homes for the elderly) 
Priority 3 Mid-Range Food Programme (Assurance
Informed) 
To establish based on representative and randomised
sampling an inspection programme applied to medium
risk Food Business Operators which may require a formal
intervention and to integrate them into an inspection
program to be carried out by authorised officers of the
Council or appointed contractors and which will provide
on the basis of a sample of FBOs an indication of the
state of compliance of all FBOs under the Council’s
jurisdiction. 
Priority 3 - this work has not yet commenced but remains in the programme for
Q4 2024, Q1 2025 
Priority 4: Low Risk & Unrated Food Business
Operators (Intelligence Driven) 
Ensure that all low risk and unrated or new food hygiene
premises are allocated with an appropriate risk and
intervention
Priority 4 - This work remains ongoing; procedures have been agreed for desktop
assessments as appropriate and to amend administrative processes to enable
more efficient processing of registration forms. This process we allow officers to
target interventions as necessary more effectively. There remains approx. 500
unrated FLRS premises, distributed equally over the last 5 years the project to
reduce this number had reduced the historic ones but resource issues have meant
recent numbers have increased. 
Page 213

Page 214

Continue to engage with partners in Scottish Government
and Industry to ensure EH Service is structured and
financed to best facilitate the needs of the export market
and appropriate arrangements are in place for imported
food. 
Ongoing, including participating in a Scottish wide time recording exercise for food
control, discussions on the SAFER project, chairing the OCV Working Group,   
Deliver a Food Sampling plan focussed upon the Official
verification of High Risk FBOs
Food sampling plan commenced in 2023 and continues into 2024. We also
participation in the national FSS priority sampling topics. Samples that highlight
results indicating non-compliance issues are followed up with the originating
business with actions taken as appropriate. 
6 General Public Health Protection   
Implement and deliver the priorities defined in the Joint
Health Protection Plan 23/25, working in conjunction with
other partners and through our statutory work
Health Protection Plan was approved by Argyll and Bute Council on the 19 April
2023. Plan also approved by Highland Council and NHS Highland 
Assess the adequacy of public health controls at airports
and ports across Argyll and Bute   
Review of port and airport health arrangements delayed due to vacancy. Review
to be progress in 24/25 
Review the Councils temporary mortuary arrangements in
Tiree to identify whether there is a continued need to
provide this facility 
Review of temporary mortuary facilities in Tiree to be undertaken in 24/25 
Review and update of all risk assessments in regard of
Blue Green Algae (BGA) affected water bodies and
update as appropriate. Review of effectiveness of the
2022 project that used semi-permanent signage as a
route to inform the public more widely of issues relating to
BGA   
Review of blue-green algae arrangements delayed pending national review of
standards. Work to be progressed early 2025 but operational response in place to
respond to any blue-green algae incidents, and semi-permanent signage in place
at high-risk lochs across Argyll and Bute. All signage for 2024 reviewed and
replaced as necessary and notifications recorded for risk assessment, with
additional temporary signage provided as appropriate. 
7 Environmental Protection 
Local Air Quality Management: Continue to monitor and
review nitrogen dioxide levels at locations where
members of the public might be regularly exposed and
where there is the potential for poor air quality because of
traffic emissions   
Prepare and submit the Annual Progress Report to the
Scottish Government 
Local Air Quality progress report submitted to Scottish Government in June 2024
and concluded that air quality in Argyll and Bute remains good. 
Page 214

Page 215

Establish a strategic approach to LAQM Strategic AQR Group to be convened late 2024 
Respond to concerns and enquiries regarding local air
quality impacts 
Arrangements in place to highlight local air quality issues relating to planning
applications. 
Review Air Quality impact reports submitted to support
planning applications 
Continue to highlight potential air quality impact within Planning and Development
control 
Participate in National initiatives to improve air quality Ongoing 
Land Contamination   
a) Continue to liaise within Development Management to
ensure land contamination issues are appropriately
considered. 
Ongoing liaison with development management colleagues and weekly planning
lists regularly reviewed 
b) Review weekly planning lists for developments with
potential land contamination issues. 
Site investigation reports are reviewed as part of assessment to determine
whether investigations are adequate to discharge planning conditions. There is
currently a backlog of investigations to assess.  Given the extent of this work, the
Council have had to outsource this work to an external consultant, to meet
demand. This option is unsustainable as the costs are unbudgeted and options
are being considered. 
c) Review land contamination investigation and
assessment reports submitted to support
redevelopment. 
Project ongoing to digitise historic land uses through a Temporary Environmental
Protection Information Officer. Project on target to be completed by 30/10/24 and
funded jointly by environmental health and development management. 
d) Update and improve information on historic land use;
creation of a potentially contaminated land database
(GIS layer)
Ongoing liaison with developers at an early pre-planning application stage 
e) Liaise with developers or their agents regarding
potential land contamination as early in the
development process as possible 
Ongoing liaison between SEPA and Council  
Page 215

Page 216

f) Continue to liaise with SEPA regarding water
environment impact and assessment 
Ongoing investigations into a potentially contaminated site within our area. 
a) Respond to concerns and enquiries regarding land 
contamination 
Ongoing 
b) Consider potential land contamination concerns in
terms of formal Part IIA investigation  
Ongoing 
g) Review the Council’s Contaminated Land Strategy Review of contaminated land strategy planned for February 2025 
h) Maintain the Council’s Contaminated Land Register Councils Part IIA register is maintained and there are no properties or sites
currently on the register. 
General Environmental Protection 
Liaise with and support environmental health on issues
such as burning, environmental noise, vibration, dust,
vapours   
a) Measures in place to respond to issues and support teams. 
b) Demand reduction exercise undertaken to review our response to service
enquiry types and free-up resources from this resource-heavy reactive work. 
Total
(1/4/23-
31/3/24)
% responded
to within 20
working days
(target is 75%)
% responded
to and
completed
Number of service
requests received 
2335 73% 99% 
Support Service Management Team on National
environmental issues such as relevant National
consultations and preparation of briefing notes on
National initiatives (e.g. Deposit return scheme) 
Ongoing 
Support Service Management Team on local
environmental issues such as Health Protection, Energy
and Renewables, Pollution incidents  
Ongoing 
Liaise with GSS and SEPA on the investigation and
monitoring of pollution incidents and complaints (e.g.
vapour, fumes, and fuel leaks) 
Ongoing 
8 Short-term let licencing Note: There are considerable challenges in assessing more than 3200
applications, due to resourcing difficulties and workload. All applications
not determined within 12 months, are deemed granted, and the service is
presently developing its strategy to deal with deemed licences. 
Page 216

Page 217

Notwithstanding this, they require formally assessment, but the “deemed”
process allows hosts to continue operating this business. 
a) Deliver and promote the short-term let licensing
scheme across Argyll and Bute Council and
determine all applications for licence 
a) Arrangements in place to deliver the short-term let licensing regime. To date,
there has been 3200 applications received by the Council and 1032 granted 
b) Review and develop procedures and systems relating
to the licensing scheme   
b) Policies and procedures have been reviewed. Formal review of STL Policy
approved by Council in September 2023. 
A  further review is ongoing to reflect changes to legislation and the deemed
grant policy 
c) Effective engagement with hosts, consultee,
stakeholders, and other agencies (e.g. Association of
Scottish Self Caterers, Wild Argyll etc.)   
c) There is ongoing liaison with other agencies and the sector 
d) Support the work of the Council and Loch Lomond
and the Trossachs National Park to consider the need
for Short Term Let Planning Control Areas.
d) All STL applications have been digitised and are available to planning
authorities in assessing the appropriateness or necessity for short term let
planning control areas. 
9 Private landlord registration   
a) To determine applications for renewal or new private
landlord registration applications 
Arrangement in place to determine registrations for renewals or new landlords or
let properties. There are presently 3349 private landlords (that are either
registered or have submitted an application to renew) and 235 new landlord
applications providing just under 5000 properties for let across Argyll and Bute
(some landlord jointly own a property and others have multiple properties) 
b) To provide advice and assistance to landlords
seeking to register, and tenants raising concerns, in
respect of the operation of the scheme and signpost
to additional assistance as appropriate. 
This work is ongoing 
c) Develop a procedure for ensuring complaints
regarding private lets are investigated and actioned
appropriately including the ability to make reports to
the first-tier tribunal and design of a tenant's
information pack/leaflet for circumstances where our
direct intervention is not appropriate
Advice is provided to those who contact the team, signposting to other
departments is also carried out. Delay in tenants' information pack production due
to vacant post.   
Page 217

Page 218

d) Investigate unregistered landlords and those with
incomplete registrations to ensure compliance. Take
enforcement action as appropriate against those who
are non-compliant, including refusal of registration
application 
referrals to Housing and Property Chamber. 
The service has been unable to recruit a Registration Assistant for 12 months
despite repeated attempts. As a result, this action has been paused meantime,
unless their intelligence identifies the need for urgent intervention. Tacit approval
of longstanding applications that contain <3 premises has commenced, given
landlords are entitled to let premises unless a decision is made and a suggested
tacit approval at 1 year exists, but has not yet been commenced. These are
marked in our system pending further intelligence 
10 Licensing Standards (Liquor)   
a) To deliver the Argyll and Bute Councils Licensing
Standards Workplan for 23-25 
b) Service plan for 23/24 achieved and 24/25 plan in place   
c) Take appropriate action(s) in response of service
requests and applications for new licences, renewals
and for occasion and extended hours. 
a) This work is inbuilt into the work program for licensing standards officers and
over the year, a total of 112 licensed premises were inspected, 777
applications for occasional and extended licences were considered together
with 1781 service requests responded to 
d) Support the work of Safety Advisory Groups to secure
safe and successful events. 
b) Licensing Standards Officers continue to support events and the work of the
Safety Advisory Groups, for the larger events 
11 Animal Health and Welfare 
a) The proportionate and effectiveness enforcement of
animal health and welfare across Argyll and Bute to
secure compliance. 
This is an inherent part of the animal health and welfare services enforcement
policy 
b) Working with stakeholders, deliver the Councils
Animal Health and Welfare Framework Service Plan
for 23-25 
Animal Health and Welfare Framework Service Plan 23/25 was approved by PPL
Committee on the 20/09/2023 and measures are in place to deliver this, including
liaison with other agencies including Animal Health and Plant Agency. 
c) Continue to maintain an overview of the potential
impact of the proposed new Scottish Veterinary
Service on animal health and welfare services within
local authorities. 
The Scottish Government have confirmed that they will not be progressing with
the Scottish Veterinary Service at this time. 
d) Provide support, through advice and enforcement, to
agricultural industry and wider communities on animal
disease issues, including avian influenza 
Ongoing provision of support and enforcement actions   
e) Review the Councils animal health disease outbreak
plans and arrangements to improve our level of
preparedness.
The review of the Councils animal health disease plan and specific plans is
complete (e.g. avian influenza, blue tongue etc) to align them to the West of
Scotland Regional Resilience animal disease plans. 
Page 218

Page 219

Note: The mobile anthrax incinerator which we provided for our use, and
for other local authorities, has been decommissioned as it has not been
possible to source a gas safety engineer qualified to assess the
incinerator. 
Page 219

Page 220

This page is intentionally left blank