North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 21 March 2024 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 25 January 2024 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Participatory Budgeting
Submit report by the Executive Director (Communities & Education) on
the ongoing development of small grants Participatory Budgeting (copy
enclosed). 
4 Council Plan Mid-Year Progress Report
Submit report by the Head of Service (Democratic) on the Council Plan
Mid-Year Progress Report 2023-24 (copy enclosed).  
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 2023/2024 Half Yearly Complaint Report
Submit report by the Head of Service (Democratic) on the Council's
complaint performance and the volumes and trends of complaints
received in the first six months of Financial Year 2023/24 (copy
enclosed). 
6 External Audit Plan 2023/24
Submit report by the Head of Service (Finance) to inform the Committee
of the External Audit Plan for 2023/24 (copy enclosed). 
7 Internal Audit Plan 2024/25
Submit report by the Head of Service (Finance) on the proposed internal
audit plan for 2024/25 (copy enclosed). 
8 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between January and February 2024 (copy
enclosed). 
9 Internal Audit and Corporate Fraud Action Plans: Quarter 3 update
Submit report by the Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 31 December 2023 (copy enclosed). 
10  Standing Item of Business: Consideration of future business for
scrutiny 
11  Urgent Items
Any other items which the Chair considers to be urgent. 
12  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

Audit and Scrutiny Committee
25 January 2024 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Cameron Inglis, Matthew McLean and John
Sweeney. 
Present (Remote Participation)
Tom Marshall and Donald L. Reid. 
In Attendance (Physical Participation)
A. Sutton, Executive Director, R. Leith, Head of Service (Connected Communities)
and A. McClelland, Head of Service (Education) (Communities and Education); R.
McCutcheon, Executive Director, Y. Baulk, Head of Service (Housing & Public
Protection) and T. Reaney, Head of Service (Neighbourhood Services) (Place); P.
Doak, Head of Service (Finance and Transformation) (Health and Social Care
Partnership); M. Boyd, Head of Service and L. Miller, Senior Manager (Audit, Fraud,
Safety and Risk) (Finance), B. Quigley, Senior Manager (ICT) (People and ICT), and
A. Craig, Head of Service, C. Stewart and S. Wilson, Committee Services Officers
(Democratic Services) (Chief Executive’s Service). 
Chair
Councillor Bell in the Chair. 
Apologies
Davina McTiernan. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Audit and Scrutiny Committee held on 14 November
2023 were confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973. 
3. Chair’s remarks 
The Chair, in terms of Standing Order 10.5, agreed to vary the order of business to
allow consideration of item 5 (HMIE Progress Review of Community Learning and
Development) before item 3 on the Agenda. 
Agenda Item 2
5

Page 6

4. HMIE Progress Review of Community Learning and Development 
Submitted report by the Executive Director (Communities & Education) informing of
the outcomes of the recent Progress Review of Community Learning and
Development (CLD) by HMIE.  The Community Learning and Development Progress
Visit Report North Ayrshire Council was attached at Appendix 1 to the report. 
The dedication and commitment of the Community Learning and Development team,
in respect of the work that they were doing for local communities in North Ayrshire,
was acknowledged by the Committee. 
The Committee agreed to (a) note the recent Progress Review carried out by HMIE
against the CLD Strategic Plan and the positive feedback from this; (b) approve the
actions planned as a result of the outcome of the review; and (c) note that the
progress review had been presented to the Cabinet at its meeting in December
2023. 
5. Annual Report – School and Early Learning and Childcare Inspections
2022-23 
Submitted report by the Executive Director (Communities & Education) informing of
the performance of North Ayrshire schools and early learning and childcare settings
in external inspections, with a focus on those published during session 2022-23. 
The Education Scotland inspection reports which highlighted a number of key
strengths common to several of the establishments they visited in North Ayrshire in
2022-23 were attached at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to:- 
• the methodology and criteria behind what type of inspection might be carried
out by Education Scotland, particularly when it concerned a full inspection;
• the improvement actions that would be put in place by the Service to address
any areas of concern, following due consideration of the inspection reports;
• support provided to partner nurseries;
• the inspection frequency for Treetops Nursery; and
• the good working relationship between the Service and Education Scotland
and the Care Inspectorate, in terms of addressing any areas of anxiety and/or
concern amongst Head Teachers and staff, during inspection of schools and
Early Learning and Childcare settings. 
The Committee agreed to (a) note the contents of the report; and (b) commend the
performance of schools and Early Learning and Childcare settings in inspections
conducted by Education Scotland and the Care Inspectorate. 
6. Education Authority Annual Plan 2023-24 
Submitted report by the Executive Director (Communities & Education) informing of
the content and requirement for publication of the Education Authority Annual Plan
for 2023-24. 
6

Page 7

The draft Education Authority annual plan for 2023-24 was attached at Appendix 1 to
the report. 
Members asked questions and were provided with further information in relation to:- 
• the use of some of the language contained in the report and whether this
represented a material change in terms of the previous reporting style;
• measures to improve attendance, which was one of the 5 priorities in the NAC
Education Service Improvement Plan 2023-26; and
• whether any analysis or evaluation had been undertaken on changing the
school week to make it shorter, which had been undertaken by a number of
other Education Authorities, but which was not proposed to be taken in North
Ayrshire. 
The Committee agreed to note the content of the Education Authority Annual Plan
for 2023-24 and its publication as required by the Education (Scotland) Act 2016. 
7. North Ayrshire Council’s Performance Strategy 2023-28 
Submitted report by the Head of Service (Democratic) advising of the Council’s
Performance Strategy 2023-28, including a new approach to self-assessment.  ‘Our
Performance Management Strategy 2023-28’, which combined learning from the
previous strategy with the Best Value Thematic Approach and initial draft results of
the audit, was attached at Appendix 1 to the report. 
A member asked a question and was provided with further information in relation to
the differences between the new strategy and the previous strategy. 
The Committee agreed to note (i) ‘Our Performance Management Strategy 2023-28’
and (ii) that it formed the basis of performance management within North Ayrshire
Council. 
8. Year End Performance Reporting: Council Plan Year End Progress
Report 2022-23; and Local Government Benchmarking Framework
Analysis of 2023 Data Release 
Submitted report by the Head of Service (Democratic) advising on progress of the
Council Plan priorities.  The Council Plan Year End Progress Report and supporting
performance measures were attached at Appendices 1, 2 and 3, respectively, to the
report.  Appendix 4 detailed the Council Plan Annual Performance Report with
Appendix Five, providing the status of the Council’s performance indicators within
the LGBF Analysis of 2023 Data Release. 
Members asked questions and were provided with further information in relation to:- 
• the new hybrid way of working of the Council and whether there had been any
adverse or improved performance trends amongst staff arising from this
changed model of working; and
• actions that were significantly adrift of target and the reasons for
underperformance within each action including efforts being made to rectify it.
7

Page 8

The Committee agreed to note (i) the Council Plan Year End Progress Report and
supporting performance measures as set out at Appendix One, Two and Three to
the report; (ii) the Council Plan Annual Performance Report as set out in Appendix
Four to the report; (iii) the status of the Council’s performance indicators within the
LGBF Analysis of 2023 Data Release at Appendix Five to the report; and (iv) that
officers would review the timescales involved in terms of performance reporting, with
a view to seeing whether they could be reduced in any way. 
9. North Ayrshire Council Plan 2023-28: Performance Management
Framework 
Submitted report by the Head of Service (Democratic) on the Council Plan 2023-28
Performance Management Framework, attached at Appendix 1 to the report. 
Noted. 
10. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed between November and December 2023.  The findings from two
audit assignments were detailed at Appendix 1 to the report, together with the
respective executive summaries and action plans. 
In response to a question by a Member concerning assurance of a contract already
let and constructed, and the management of such, it was agreed, having heard the
Chair, that a report on the subject matter, in general, would be submitted to a future
meeting of the Committee for Members’ consideration. 
Noted. 
11. Exclusion of the Public – Para 1 
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph 1 of Part 1
of Schedule 7A of the Act. 
12. Investigation Reports Issued (Exempt Item) 
Submitted report by the Head of Service (Finance) informing of investigation reports
finalised since the last meeting of the Committee. 
Noted. 
The meeting ended at 11.40 a.m.
8

Page 9

NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    Participatory Budgeting 
Purpose:  To update the Audit and Scrutiny Committee on the ongoing
development of small grants Participatory Budgeting. 
Recommendation:  That the Audit and Scrutiny Committee: 
a) Reviews the adaptations made to the small grants
Participatory Budgeting process in response to feedback; and
b) Notes the progress made in developing the small grants
programme within localities. 
1. Executive Summary 
1.1 The Community Empowerment (Scotland) Act 2015, Community Wealth Building
approaches and North Ayrshire Council’s own aspirations all support the greater
involvement of local people in democratic and community activities, increased
participation in local financial decision-making and, in particular, the increased use of
participatory budgeting (PB) approaches. 
1.2 Participatory budgeting is a democratic way for people to have a direct say on how
public money is spent.  A PB process gives people the opportunity to identify and
discuss what matters to them in their communities and to vote on their priorities. North
Ayrshire Council’s PB approaches have been recognised as sector-leading, with
successful engagement across small grant-making, thematic and mainstream PB, using
different approaches. PB in North Ayrshire is now mainstreamed into service design
and delivery, with community, elected member and partner support. 
1.3   An update was provided to the Audit and Scrutiny Committee in September 2022
regarding the engagement methods used for PB across North Ayrshire. The Committee
agreed to approve the recommended engagement methods for use in future
Participatory Budgeting events, as set out in the report. 
1.4 A request has been made for a further update detailing the progress around the locality
based small grants PB processes in particular, and changes made to these processes
in response to feedback provided by community members regarding previous rounds. 
Agenda Item 3
9

Page 10

2. Background 
2.1 The Community Empowerment (Scotland) Act 2015, Community Wealth Building and
the Scottish Government’s Open Government Action Plan all support the greater
involvement of local people in democratic and community activities, increased
participation in local financial decision-making and, in particular, the increased use of
participatory budgeting (PB) approaches.   
2.2 Locality Partnerships have been pivotal to North Ayrshire’s success in moving local
decision-making into communities. They have each established their own priorities in
relation to addressing local inequalities. Locality small grants PB has been in place
successfully for several years, helping support public understanding and confidence in
the implementation of mainstream PB within the Council’s budgets. Mainstream PB can
play a central role in collectively defining services which meet the changed (and
changing) needs of communities. 
2.3   The Council’s vision for PB is embedded in the vision for radical, participatory democracy
in which local people take decisions on the things which affect their lives. It is one of a
suite of tools which are used within North Ayrshire to encourage and support
participatory democracy. The small grants PB process puts the decision making as to
how the funds are spend locally directly into the hands of community members, with
local groups applying for funding of up to £1,000 and community members voting to
identify which are most important to them and should receive the funding. 
2.4 There are many benefits to the Council and the communities it serves in participatory
methods of working. These include: 
• Greater involvement in decision making across the Council;
• Improved transparency of decision making;
• The opportunity for a wider range of groups to be involved;
• Improved trust between Council & communities;
• Increased democratic participation;
• A greater sense of ownership and control; and  
• Real devolved power to Localities. 
2.5 North Ayrshire Council has long attracted national recognition for its sector-leading work
in PB, as noted in the 2020 Best Value Audit Report. The approach is recognised by
CoSLA, the Local Governance Review Team and the Scottish Government as good
practice and has previously received recognition nationally as a finalist in awards. North
Ayrshire Council’s Officers play an active role in national PB Working Groups and are
regarded as a source of expertise and advise by colleagues nationally. 
2.6 PB events have to strike a balance between tight deadlines, available resources, wide
participation and workload. PB is one of a range of tools used to support participation
and community empowerment, and the Locality Partnerships and Locality CLD Teams,
and the relationships they build within communities, are key to its success. The support
of community members in reviewing applications is an invaluable part of the process.
We realise that officers, community reviewers and community groups all have limited
time and resources available to them and a key consideration is ensuring the process is
as easy as possible for all involved, while remaining robust in nature, in order to make
the most of times and resources. 
10

Page 11

2.7 With regard to the small grants programme, public voting is one characteristic, however
the ability of local groups to bring forward their projects and to influence the decision-
making is a central component of the process. In the most recent 2023/24 cycle, 236
applications were made, with 184 projects receiving £198, 377 in total and 9,664 votes
being cast.
2.8 When designing this cycle, an intentional and focussed effort was made to ensure that
local people found it as accessible as possible through streamlined processes,
simplified language, new events and a fully hybrid experience that opened PB to a
diverse range of participants. The hybrid experience means that those who can are able
to use the online voting system provided through CONSUL, while recognising that not
all community members are able or comfortable making use of online tools and ensuring
an in person voting option through libraries is available to them.
2.9 The process used was developed in response to the feedback received from the
2022/23 cycle. The success of the 2023/24 cycle has been recognised by both CoSLA
and the Minister for Community Wealth and Public Finance as a national example of
good practice in co-design and the use of digital platforms to promote participation. 
2.10  A full report about the process and the learning has been produced and this is attached
as Appendix 1 for consideration. The key adaptations made to the process as a result
of the previous feedback are as follows: 
Issue You Said We Did
In-person
opportunities
lost during
COVID-19
pandemic
NAC needs to “raise
awareness of the PB process,
of the projects looking for
funding and also offer the
networking opportunity for
partnership working. It was
also clear from the
applications that some had
difficulty with the process
and this would be an
opportunity to
assist with this”
Developed the concept of PB launch
events using feedback from 2022-23
round and community engagement
responses, with one held in each
locality at the start of the
application process. The events
created space for support and advice
from NAC staff, in addition to
networking opportunities (e.g. for
partnership bids to the UKSPF PB).
Funding
criteria
Criteria needs to be reviewed
to identify opportunities to
tighten the language and make
the processes fairer for all. For
example, “multiple groups from
one place are applying.”
Drafted criteria based on 2022-23
feedback and presented for
comment and further
recommendations at Community
Engagement Event. Changes made
based on discussion and approved by
Senior Managers for 2023-24 round.
Application
process
Disproportionately long and
complexgiven the size of grant
available.
Potential barrier to applicants.
Application redesigned for CONSUL,
streamlining from 25 to 11 questions
and making language more
accessible. Ability to save and edit
introduced.
11

Page 12

Approving
applications
progressing
to public
vote
“Scoring mechanism required
to be
reviewed…ambiguous and
making
the low compliance score very
easy
to obtain”. Shortlisting panels
also
under significant pressure from
paperwork.
Complete redesign resulting in
applications being reviewed against
criteria (either eligible or ineligible to
proceed) rather than scoring,
streamlining paperwork. Volunteers
renamed ‘community reviewers’ to
better reflect the role they played in
the process and attract new faces.
Logging in
to CONSUL
Default option of MyGov.Scot
was
too confusing and complicated
and
posed a major barrier during
the
early voting in the 2022-23
round
Created a local login for CONSUL in
response to issues raised in 2022-23
round.
Retained this option and introduced
Facebook and Google login for 2023-
24 round, with no significant issues
raised in the 2023-24 process. 
2.11 It is vital to note that PB processes are by their nature an iterative process and will
continue to be refined in response to feedback as they progress. The changes which have
been made in the 2023- 24 round have been received positively, with no continued or
further issues raised since the 2022-23 round. 
3. Proposals 
3.1 
That the Audit and Scrutiny Committee: 
a) Reviews the adaptations made to the small grants Participatory Budgeting process in
response to feedback; and
b) Notes the progress made in the small grants programme within localities. 
4. Implications/Socio-economic Duty 
Financial 
4.1 PB funding is allocated within existing resources. 
Human Resources 
4.2  PB is resource-intensive and PB development has to be balanced with staff capacity
and resources within local groups and organisations to engage with PB. 
Legal 
4.3 None. 
Equality/Socio-economic
12

Page 13

4.4 The purpose of PB is to increase community involvement in local decision-making.
North Ayrshire Council has worked with Locality Partnerships and community  members
to develop its PB approach which will reduce inequalities, increase community cohesion
and advance community empowerment.   
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 Participatory Budgeting supports the North Ayrshire Council Plan strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• We will have active, inclusive and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7  PB increases democratic ownership of local financial decision-making and allocation
of resources. 
5. Consultation 
5.1 Co-production is at the heart of our relationship with communities.  Development of PB
processes as outlined within this paper has been created in line with ongoing feedback
from community members, groups and staff as to how the process could be improved
and streamlined. Continued engagement and evaluation will take place in future to
ensure processes remain as accessible as possible. 
Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Rhonda Leith, Head of Connected Communities,
on 01294 324415. 
Background Papers
Participation Budgeting Report 2023-24 
13

Page 14

Co-design, partnershipandparticipation
Participatory
Budgeting
20
23-24:
R
eview
14

Page 15

01
TABLE OF
CONTENTS
Introdction and
Executive
Summary
02 Background
03 Reshaping PB
04 How Did It Go?
05
You Said, We
Did: A Co-Design
Approach to PB
06
Reflections and
Recommendations
07
Reflections and
Recommendations:
COSLA Perspective
08 Reflections and
Recommendations:
Ministerial Recognition
15

Page 16

Executive Summary
Participatory Budgeting (PB) has a long history at North Ayrshire Council, which
has been nationally recognised as a leader in designing and implementing engaging
and impactful PB processes.
The 2023-24 cycle distributed £198,377 of funding through a community-driven
decision making process that gave North Ayrshire residents the say on the projects
and priorities that mattered most to them.
Of 236 applications submitted across Locality, Youth and the new UK Shared
Prosperity Fund (UKSPF) PB, a total of 184 projects received funding. 9,664 votes
were cast online, in libraries and in schools across North Ayrshire.
Local perspectives and experiences were central to the 2023-24 cycle, with feedback
and recommendations from past volunteers and participants shaping the process
from beginning to end. An intentional and focussed effort was made on ensuring
that local people could see themselves in the new cycle through streamlined
processes, simplified language, new events and a fully hybrid experience that opened
PB to a diverse range of participants.
The success of the cycle has been recognised by both COSLA and the Minister for
Community Wealth and Public Finance as a national example of good practice in
co-design and the use of digital platforms to promote participation.
Introduction
and
Executive
Sum
m
ary
pn
1
Introduction
This review has been undertaken by the Capacity and Empowerment Officer
and the Community Economic Development Officer to record the 2023-24
Participatory Budgeting (PB) cycle and provide recommendations for the future.
16

Page 17

Background
North Ayrshire Council has built a decade of experience of delivering
high quality, innovative PB opportunities for local people. This is often
through the provision of small-grant PB processes where Third Sector
organisations can apply for a small share of funding (around £1,000)
to support projects.
A total of £198,377 was available for the 2023-24 PB cycle:
£97,377 from the central PB fund
£20,000 from the Health and Social Care Partnership
£50,000 ringfenced for youth projects
£31,000 from the UK Shared Prosperity Fund (UKSPF)
In the 2023-24 round, Locality PB was run in parallel with Youth PB,
streamlining the administration and centralising PB for communities.
Locality and Youth PB were open to applications of up to £1,000. The
allocation of funding from the UKSPF award enabled the creation of
a new ‘pot’, opened to partnership applications from across North
Ayrshire for up to £5,000.
The split of funding for Locality and Youth PB is calculated based on
population in each area:
Locality Locality PB Allocation Youth PB Allocation
Arran £8,979 £4,971
Garnock Valley £15,232 £8,433
Irvine £29,841 £16,520
Kilwinning £11,978 £6,631
North Coast
and Cumbrae £17,621 £9,755
Three Towns £24,725 £13,689
pn
2
17

Page 18

A
PPLICATION
S
3
Reshaping PB
The 2023-24 PB was designed
based on the learning and
feedback gathered during the
previous round, which formed
the basis for the redesign of the
process. This included the use
of CONSUL to host all
applications to provide better
transparency and visibility; an
amended set of criteria; a
redesigned application review
process and the continuation of
a fully hybrid way of working.
A Community Engagement Event was held in June, with over 20 in
attendance including previous PB volunteers and participants who
signed up through our social media channels. A small number of North
Ayrshire Council staff who found the volunteer opportunity via News
In Brief also participated.  Those attending were key to guiding and
shaping decisions about the look and feel of the new cycle.
Launch events were held in each locality to provide support for
applicants and space to network and bring people together post-
pandemic.. The Capacity and Empowerment Team provided 1-2-1
support on the application form, voting and digital access if required.
As a result, a significant improvement in application quality could be
seen from those who attended the events.
Following the engagement sessions and launch events, new volunteers
were recruited as part of the shift from ‘shortlisting panels’ to
‘community reviewers’, ensuring local participation in checking
applications before public voting began. A new training session was
developed, along with refreshed guidance and review packs based on
the recommendations of previous participants who had found the time
invested in scoring to be disproportionate to the amount being applied
for. By shifting from ‘scoring’ to ‘reviewing eligibility against criteria’,
the transparency of the process was also increased for applicants.
To ensure access to everyone, parallel offline processes were developed
for each stage of the PB, including paper applications available from
libraries or by request, and a fully offline voting process also offered in
libraries.
SUBMITTED
236
Three Towns PB
Launch Event, 2023
Only 1% of
applications were
submitted offline
in the 2023-24
round!
Many groups
trypically seen to
be at risk of
digital exclusion,
such as older
people’s groups,
were able to
complete the
application online
with support,
building their IT
confidence and
skills.
18

Page 19

How Did It Go?
A total of 9,664 votes were cast by local people, who made the decision
on the 184 projects that benefitted from PB funding, Any underspend
from Locality PB funds was transferred into the Youth PB fund for that
area to boost the number of Youth projects supported, as recommended
by the community reviewers for this round.
With the addition of UKSPF PB funding there was opportunity for
partnership projects to benefit from up to £5,000 each, encouraging
collaboration and impact at a larger scale than would traditionally be
expected through small-grant PB. In a challenging external funding
landscape, this also gives local organisations experience in partnership
working that can be used in future applications, building their capacity
and potential to secure further funds.
One of the outcomes of running Locality and Youth PB together was a
reduction in the number of projects submitted to Locality PB overall, as
eligible projects could only apply to one fund. This suggests that the
previous approach of hosting Locality and Youth PB at different times
of year has ‘double funded’ several projects, potentially reducing the
overall number of initiatives being successful through PB. The issue of
potential 'double funding' was raised by participants in the previous
round, who were concerned that this limited the opportunities for
smaller, less well-known projects to secure funding through PB,
particularly where larger organisations running multiple projects could
mobilise a higher number of voters to support them. This can lead to
disengagement with the process and a feeling that PB is inherently
unfair on new groups or ideas. Future PB rounds should continue to look
at ways to engage smaller, grassroots organisations while balancing the
diverse needs and aspirations of North Ayrshire’s Third Sector in the
design of PB processes.
Funding awards were distributed to successful organisations from mid-
December. In previous rounds of PB, winners were not asked for a
formal report on spend until a year later, but moving forwards short
progress updates are expected on a quarterly basis. This aims to better
capture the progress of projects in ‘real time’, showing communities how
the initiatives they supported are evolving and making a difference.
This is the first step towards broadening the understanding of PB
beyond ‘funding’ and demonstrate the power that local people have to
decide what happens in their community in a tangible way.
4 19

Page 20

Issue You Said We Did
In-person
opportunities
lost during
COVID-19
pandemic
NAC needs to “raise awarneess of
the PB process, of the projects
looking for funding and also offer
the networking opportunity for
partnership working. It was also
clear from the applications that
some had difficulty with the process
and this would be an opportunity to
assist with this”
Developed the concept of PB launch
events using feedback from 2022-23
round and community engagement
responses, with one held in each
locality at the start of the
application process. The events
created space for support and advice
from NAC staff, in addition to
networking opportunities (e.g. for
partnership bids to the UKSPF PB).
Funding
criteria
Criteria needs to be reviewed to
identify opportunities to tighten the
language and make the processes
fairer for all. For example, “multiple
groups from one place are applying.”
Drafted criteria based on 2022-23
feedback and presented for
comment and further
recommendations at Community
Engagement Event. Changes made
based on discussion and approved by
Senior Managers for 2023-24 round.
Application
process
Disproportionately long and complex
given the size of grant available.
Potential barrier to applicants.
Application redesigned for CONSUL,
streamlining from 25 to 11 questions
and making language more
accessible. Ability to save and edit
introduced.
Approving
applications
progressing
to public
vote
“Scoring mechanism required to be
reviewed…ambiguous and making
the low compliance score very easy
to obtain”. Shortlisting panels also
under significant pressure from
paperwork.
Complete redesign resulting in
applications being reviewed against
criteria (either eligible or ineligible to
proceed) rather than scoring,
streamlining paperwork. Volunteers
renamed ‘community reviewers’ to
better reflect the role they played in
the process and attract new faces
Logging in
to CONSUL
Default option of MyGov.Scot  was
too confusing and complicated and
posed a major barrier during the
early voting in the 2022-23 round
Created a local login for CONSUL in
response to issues raised in 2022-23
round.
Retained this option and introduced
Facebook and Google login for 2023-
24 round, with no significant issues
raised in the 2023-24 process.
You Said, We Did: A Co-Design Approach to PB
5 20

Page 21

Reflections and Recommendations
The 2023-24 PB represents significant efforts to better design and
run a process that meets the expectations and aspirations of North
Ayrshire residents and build trust in the Council. All changes made
can be traced back to feedback collected from 2022 onwards, with
local people at the centre of the decisions and changes made.
1.
The new UKSPF PB proved extremely popular, with 21 eligible
projects competing to secure a share of £30,000. This
demonstrates the interest in larger pots of funding to be made
available to local projects through PB, and the potential to scale up
the process for larger amounts.
2.
The anecdotal feedback from applicants about the changes made
to the application form has been overwhelmingly positive,
particularly the ability to save and return to in-progress
applications, removing the pressure of ‘getting it all right first time’.
Participants also appreciated being able to see the other projects
in their area and find out what was going on in North Ayrshire, as
all applications were publicly viewable throughout the process.
3.
The investment of staff time in monitoring, supporting and
progressing PB is significant, even where a digital platform can
remove significant volumes of paperwork. High quality, responsive
and dedicated administrative support is crucial to manage the
granular details of a PB process, which can have significant
impacts if missed. Adequately resourcing the support required to
run PB will always be a challenge, but the structures and learning
created during the 2023=24 round in particular set up future staff
for success as far as possible. Handover packs and templates have
been made available centrally for staff to access in future.
4.
Further focus on reporting from grant winners is required, and
early discussions with COSLA indicate that CONSUL is being
developed to allow applicants to provide project updates on the
platform directly. This would greatly increase the transparency of
PB and provide the public with ‘real time’ updates about the
projects they supported.
5.
Additional time was required to create high quality content for
social media and local press linked to PB, such as capturing
success stories from previous rounds and collating images from
past winners. Staff working on future cycles should begin to
identify potential case studies as early as possible to create
engaging imagery promoting PB to encourage participation.
6.
6 21

Page 22

Reflections and Recommendations: COSLA Perspective
“North Ayrshire Council has now run two rounds of
Participatory Budgeting using the digital engagement
software CONSUL which is supported in Scotland by
COSLA.
The team at North Ayrshire has been ambitious in its use of
the CONSUL software enabling multi locality PB processes
to be carried out online. One of the strengths of the North
Ayrshire PB programme has been the engagement with the
community in designing the processes, providing alternative
participation channels for those not able to take part
digitally and in responding to feedback from users of the
service. It is also worth noting that by using a digital process
the staff were able to deploy their limited staff resource to
support and promote engagement rather than on
administering a paper-based system.
As a result, North Ayrshire now has a transparent, online
repository of project applications which can be analysed to
demonstrate community priorities and which can be further
updated to maintain a public record not only of the projects
but also the impact and outcomes of those projects.
The key staff involved have developed a high degree of
expertise in running digital PB processes and this could be
further exploited by other service areas within the council
both for PB and other forms of engagement. This is already
being demonstrated through good work being done in Arts &
Culture.
At COSLA we have been happy to share North Ayrshire’s
work as an example of good practice in this area.”
John Munro. PB Digital Participation Manager, COSLA
G
O
OD PRACTIC
E      
The CONSUL
platform acts as a
database of
community
initiatives, providing
the Council with a
snapshot of the
needs and priorities
of local people,
which can in turn
shape service
delivery.
Evidence of
initiatives such as
the Spike Wheat
Scots’ ‘Breaking
Bread, Building
Bonds: A Syrian
Culinary Journey’
and BABCA’s
‘Meet and Greet’ for
New Scots
showcase cross-
cultural
engagement and
community
building, described
as ‘political gold
dust’ by COSLA as
working examples of
integration and
inclusion. The
visibility of these
successes through a
platform like
CONSUL
demonstrates the
value of an online
presence to
showcase the work
of North Ayrshire’s
community groups.
7 22

Page 23

8
Reflections and Recommendations: Recognition of North
Ayrshire’s 2023-24 PB by Mr Tom Arthur, Minister for
Community Wealth and Public Finance
“1% Mainstream PB Target: COSLA are compiling this year’s
1% returns and early indications suggest these will be
positive. COSLA provided examples of the good work local
authorities are doing with PB, such as East Ayrshire
celebrating 10 years of inspiring communities; Aberdeen,
Angus, Shetland and the Borders embedding PB into their
budget process; Glasgow, East Lothian and Perth and
Kinross’ work using CONSUL and highlighted North
Ayrshire’s co-production with the community on how to run
PB processes. COSLA officials also noted specific projects in
Arran, where PB funding was used for a kids book festival
and in Kilwinning, where Syrian New Scots received PB
funding to celebrate their background and cuisines. The
Minister was impressed with this progress and commented
he would be interested to see how PB develops when it
becomes more recognised in communities.
Notes of Scottish Government and COSLA Participatory
Budgeting Meeting 12:30 – 13:30, 6 December 2023
G
O
OD PRACTIC
E
Recognition of our
sector-leading
approach to
meaningfully and
intentionally shape
participatory
processes in
partnership with
our community.
Our challenge
moving forwards is
to be more
ambitious about
what PB means for
North Ayrshire,
revisting
discussions about
mainstreaming and
wider participative
democratic
processes to
encourage local
people to get
involved in the
decisions that
affect their
communities.
Safeguarding high
quality PB
processes and
demonstrating that
a vote really makes
a difference is
central to creating
the space where
engaged and
informed citizens
can continue to
shape their future.
23

Page 24

24

Page 25

NORTH AYRSHIRE COUNCIL 
21st March 2024   
Audit and Scrutiny Committee 
Title:    Council Plan Mid-Year Progress Report 2023-24 
Purpose:  To consider the Council Plan Mid-Year Progress Report
2023-24. 
Recommendation:  The Audit and Scrutiny Committee agrees to note the
Council Plan Mid-Year Progress Report 2023-24 attached
at Appendix 1. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our Council and details
our Council’s strategic priorities.  We have a statutory duty to publish information
that enables effective scrutiny of our performance.
1.2 This report presents the progress made in delivering our new Council Plan 2023-
28 as at Mid-Year 2023/24 (30th September 2023).  The approach and layout
have been refreshed to reflect our new Council Plan as well as the results of our
Best Value Thematic Audit. Following Cabinet approval, our corporate
performance reports are published on our website www.north-
ayrshire.gov.uk/performance.
2 Background 
2.1 Under the Local Government (Scotland) Act 1992 and Local Government in
Scotland Act 2003 we have a duty to demonstrate Best Value.  To ensure we
support our residents, fulfil our statutory duties and invite scrutiny, we actively
manage performance and develop our reporting to make it accessible and
engaging.  
2.2 Our new Council Plan 2023-28 was approved by Council in June 2023 with the
Performance Management Framework (PMF) approved in August 2023.  Targets
were set for 2023/24, however due to the timing of the PMF development, mid-
year targets were not set for all indicators (it would not have been best practice
to set targets so close to the mid-year point).  This has been mitigated by
including a review of progress within the report, comparing performance to year
end targets.
Agenda Item 4
25

Page 26

2.3 In parallel to the approval of Our Council Plan, we undertook our Best Value
Thematic Audit focusing on “Leadership of the development of new local
strategic priorities”.  The outcomes of this Audit were extremely positive stating
we have a culture of continuous improvement.  
2.4 In addition, some areas could be improved further such as how we report on
audits, inspections and self-assessment activity.  This has been reflected in our
new report at Appendix 1, with the ‘Best In Class’ section of previous reports
refocused towards existing and completed audits, inspections and accreditations
– linking to the published reports where available.  This approach was discussed
with our External Auditors during the Best Value Thematic Audit, primarily as it
meant that context (such as reasons for and next steps) rather than purely a list
of audits would be available for our residents to scrutinise.
2.5 The use of the Inclusive Growth Dashboard was included in our report to Council
in June and is highlighted in the Best Value Thematic report.  This tool provides
a contextual overview of North Ayrshire, is currently being reviewed and will be
available in 2024/25 for use within our reporting.  However contextual indicators
as outlined in our PMF are included in the report.
3 Assessment of Performance 
3.1 The development of Our Council Plan leaned towards evolution rather than
revolution.  As a result, many areas are continuing to progress well from the
previous Council Plan and are detailed within the body of the report.  
3.2 There are 47 actions within Our Council Plan, with one reported directly through
the HSCP and therefore excluded from this report.  The remaining 46 actions are
all on target at mid-year.
3.3 There are 26 performance indicators within our framework.  At mid-year, the
status of 16 PIs were either unknown or data only, seven were on target and
three were slightly adrift of target (amber).  The status of the three indicators
slightly adrift of target (amber) were included in our previous Council Plan and
scrutinised at year end.
3.4 Though not all mid-year targets were available this period, our annual targets
give confidence that performance is on schedule, with some areas such as the
number of unemployed people progressing into employment already exceeding
their annual target at mid-year (652 against a target of 450).  Our Street
Cleanliness score shows we have performed better than expected at 90.1%
against a target of 87%.  Participatory Budgeting is currently showing 2.06% of
our Council budget to date, ahead of the 1.5% target for Quarter two and year
end.
3.5 Other areas include the number of empty properties brought back into use and
number of new build properties (all tenures) which are progressing at over 50%
of target at mid-year, though these may be subject to seasonal fluctuations later
in the year.  
26

Page 27

3.6 Key Highlights
• Our Council Plan 2023-28 was developed with our communities and approved
in June.
• We established our Financial Inclusion Partnership to increase access to
financial advice and support for our residents.
• Our £198,377 participatory budgeting grants programme was launched for
2023/24.
• 6,529 adults took part in adult learning and capacity building activities.
• Our Regeneration Development Plan’s action programme 2023-25 was
approved by Cabinet and includes £4million of funding.
• Several significant Ayrshire Growth Deal milestones were reached, including
contractor appointments at the Ardrossan Coastal Quarter site of Ardrossan
Campus, breaking ground on i3 in Irvine and further progress on the delivery
of Irvine Harbourside.
• We launched a £350k Community Net Zero Carbon Fund, enabling local
community groups to bid for funding to help with feasibility and/or installation
of renewable energy technologies on land or buildings they own.
• Over 100 tonnes of furniture and mattresses were collected to encourage the
reuse of items through our bulky waste partner.
3.7 Key Next Steps
• We will meet with the Improvement Service to push forward our data sharing
work following the outcome of our Scottish Government Child Poverty Practice
Accelerator Fund and Cash First Fund application.
• We will continue drafting our new Community Wealth Building strategy
following consideration by the Policy Advisory Panel and Cabinet.
• We will present a paper on treating Care Experienced as a protected
characteristic to Council in December.
• We will continue the development of the Participation Strategy and new
Community Planning Partnership website and Community Directory. 
• We will continue to plan for our 2024 Community Planning Conference, which
will focus on Democracy Matters Phase 2. 
• We will publish our new ‘Sustainable North Ayrshire’ and Energy Efficiency
Strategies.
• We will progress to construction stage for our new solar farm projects. 
• We will launch new energy efficiency measures offer as part of our Energy
Smart programme. 
• We will progress the procurement exercise for the new Ayrshire Electric
Vehicle Charging Infrastructure project. 
• We will progress with our fleet decarbonisation route map, including
exploration of a hydrogen production feasibility study. 
• We will continue the construction of the North Crescent Coastal Path Phase 1,
Ardrossan. 
27

Page 28

• We will review and implement any actions following our Best Value report due
to be published in November. 
• We will support our External Auditors in the audit of the next Best Value
Thematic Approach early in 2024, focussing on workforce innovation. 
• We will continue to engage with the Island Plan Delivery and Steering Groups
to shape the annual action plans for the Island Plans. 
4 Proposals 
4.1 The Audit and Scrutiny Committee agrees to note the Council Plan Mid-Year
Progress Report 2023-24 attached at Appendix 1.
5 Implications/Socio-economic Duty
Financial
5.1  There are no financial implications arising from this report.
Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 There are no legal implications arising from this report.
Equality/Socio-economic
5.4 There are no equality/socio-economic implications arising from this report.
Climate Change and Carbon
5.5 There are no climate change and carbon implications arising from this report.
Key Priorities
5.6 The Mid-Year Progress Report enables the effective scrutiny of the delivery of
our Council Plan strategic priorities.
Community Wealth Building
5.7 There are no Community Wealth Building implications arising from this report.
Consultation
5.8 The Executive Leadership Team (ELT) and North Ayrshire Council Cabinet
reviewed and scrutinised the report prior to submission to the Audit and Scrutiny
Committee. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Team Manager (Corporate
Policy and Performance), on 01294 324035 or email IslaHardy@north-
ayrshire.gov.uk.
28

Page 29

Our Council Plan
Mid-Year Progress
Report 2023-24
Appendix 1
29

Page 30

Contents
Our Performance at a Glance .................................................................................................................. 1
Wellbeing ................................................................................................................................................ 4
Key Ac�vi�es ....................................................................................................................................... 4
Next Steps ........................................................................................................................................... 9
Case Study ......................................................................................................................................... 10
Communi�es and Local Democracy ...................................................................................................... 11
Key Ac�vi�es ..................................................................................................................................... 11
Next Steps ......................................................................................................................................... 13
Case Study ......................................................................................................................................... 14
Climate Change ..................................................................................................................................... 15
Key Ac�vi�es ..................................................................................................................................... 15
Next Steps ......................................................................................................................................... 18
Case Study ......................................................................................................................................... 19
A Sustainable Council ............................................................................................................................ 20
Key Ac�vi�es ..................................................................................................................................... 20
Next Steps ......................................................................................................................................... 21
Case Study ......................................................................................................................................... 22
Audits, Inspec�ons and Accredita�ons ................................................................................................. 24
Performance Summary ......................................................................................................................... 25
Measures adri� of target .................................................................................................................. 25
Performance Indicators ..................................................................................................................... 26
Ac�on Tracker ................................................................................................................................... 29
30

Page 31

Our Council Plan Progress Update – Mid Year 2023-24  Page 1 of 33
Our Performance at a Glance
We established our
Financial Inclusion
Partnership to increase
access to financial advice
and support for residents.
Council approved Our
Council Plan 2023-28,
developed with our
communities.  Focus now
moves to delivery of this
contract with our residents.
1,300 residents
participated in ‘Take
Time on the Road’
roadshows focussing on
mental health and
wellbeing.
Our £198,377
participatory
budgeting grants
programme launched for
2023/24.
11,000 young people
accessed holiday
meals provisions during
the summer holidays.
6,529 adults took part
in adult learning and
capacity building
activities between April
and September.
Community Transport
Pathfinder approved
to explore transport needs
in our communities.
Our Regeneration
Development Plan’s
action programme 
2023-25 was approved by
Cabinet and includes £4m
of funding
28 Community Wishes
have been delivered, linking
the needs of communities to
our contracted businesses. 
61 have been granted since
launch in October 2021.
We launched a £350k
Community Net Zero
Carbon Fund, enabling local
community groups to bid
for funding to help with
feasibility and/or
installation of renewable
energy technologies on land
or buildings they own.
Over 100 tonnes of
furniture and
mattresses collected to
encourage the reuse of
items through our bulky
waste partner.
Several significant
Ayrshire Growth Deal
milestones reached
including contractor
appointments, breaking
ground on i3 and a move
towards the delivery of
Irvine Harbourside. 
31

Page 32

Our Council Plan Progress Update – Mid Year 2023-24  Page 2 of 33
Welcome
Welcome to our first Mid-Year Progress Report on Our Council Plan 2023-28.  Our Council Plan was
approved by Council in June 2023.  Our vision remains ‘A North Ayrshire that is fair for all’, and our
mission is ‘Working together to improve the lives of our people in North Ayrshire’.  We worked with
our communi�es to create our plan and iden�fy our four priori�es.  We view Our Council Plan as our
contract with our communi�es, ‘our’ plan.   It is more than a document, it is an ac�ve commitment
to support our residents and deliver on our joint priori�es.
Our four priori�es are Wellbeing, Communi�es and Local Democracy, Climate Change and A
Sustainable Council.  All of these four areas are interlinked and interdependent - they do not sit in
isola�on as the progress of each priority directly impacts the other three areas.  
Challenges for our residents and communi�es persist due to the cost of living crisis and suppor�ng
our residents is a significant role within our new Council Plan.  For example, through our Child
Poverty and Cost of Living Board, we are exploring different ways in which we can use informa�on to
iden�fy and address need in our communi�es.  Our colleagues in the Third and Voluntary sector
con�nue to work alongside us.
As part of our ambi�on to achieve net-zero by 2030 we con�nue to work with our communi�es
across a variety of projects.  This includes providing educa�onal opportuni�es such as the STEM trail
at Eglinton Park and suppor�ng the various volunteer groups who give their �me to help protect the
environment.  
Our communi�es drive the work that we do and as such, lived experience is a crucial element to our
decision-making process.  This can be seen through our work in implemen�ng the Ten-Year Island
Plans for Arran and Cumbrae.  This will prove crucial in forming the annual ac�on plans for the
islands.
Everything we do is achieved in the context of our environment.  Moving forward we will
demonstrate this through our ‘Inclusive Growth Dashboard’ which gives an overview of the status of
North Ayrshire.  This tool is currently being refreshed and will be available in 2024/25.  As an
overview, our key contextual indicators are shown below:
Population of North
Ayrshire:
134,220 (June 2021)
29% of our children live in
poverty after housing costs
(2021/22)
28% of our households live
in fuel poverty (2021/22)
72.1% of working age
population are in
employment (as at June
2023)
11.7% of people earn less
than the living wage
(2021/22)
Area wide CO2 emissions are
5.43kt CO2e 
Together we will create a North Ayrshire that is fair for all.
32

Page 33

Our Council Plan Progress Update – Mid Year 2023-24  Page 3 of 33
Our Priori�es 
Our Vision – A North Ayrshire that is fair for all. 
Our Mission – Working together to improve the
lives of our people in North Ayrshire. 
33

Page 34

Our Council Plan Progress Update – Mid Year 2023-24  Page 4 of 33
Wellbeing
Key Activities
Cost of Living
We are working alongside our residents to
iden�fy the areas that will make the greatest
impact when suppor�ng them financially.  The
Financial Inclusion Partnership, established in
May, will improve promo�on of and access to
advice services for our residents.  We are
implemen�ng a new case management
system.  This will enable us to see the journey
of each of our residents to provide joined up
support to meet their needs.   
To ensure residents are supported with help
around energy costs and health and wellbeing
services, we have referral pathways
established between North Ayrshire Welfare
Rights and Debt Advice Services and a number
of other services/agencies including CHAP,
Housing and Employability Services, and Citrus
Energy (Lemon Aid).   
Our Child Poverty and Cost of Living Board has
applied for funding from the Sco�sh
Government Child Poverty Prac�ce
Accelerator Fund and Cash First Fund.  If
approved this will fund a small team within
our Transforma�on Team to accelerate
progress on our ‘No Wrong Door’ ini�a�ve
including our Single Shared Assessment
ini�a�ve, which would help iden�fy the
support a resident and their family is en�tled
to more quickly. 
Full details of financial support we have
provided can be found in our six monthly Cost
of Living report.   
Lifelong Learning Opportuni�es
6,529 adults took part in adult learning and
capacity building ac�vi�es between April and
September.  This included 241 New Scots
adults who engaged in learning opportuni�es
suppor�ng their language and resetlement
needs over the summer.  Some of the
ac�vi�es included language cafes,
volunteering opportuni�es and speaking
clubs.  
We are delivering the Discovery Award.  This
helps people 50 or over to adopt an ac�ve and
healthy lifestyle by offering challenges to both
s�mulate and mo�vate.  
The “Mul�ply Project” funded by the UK
Shared Prosperity Fund has now officially
launched in North Ayrshire.  This project aims
to boost people’s ability to use maths in their
daily life, at home and work, targe�ng learners
who are 19+ that have not previously atained
a Level 2 SCQF, Level 5 or Higher Maths
qualifica�on.  
In the Garnock Valley, the North Ayrshire
Digital Network, is working in partnership with
the Sco�sh Council for Voluntary
Organisa�ons (SCVO), to deliver a Place-based
Digital Inclusion Project.  Place-based digital
inclusion builds sustainable solu�ons to digital
exclusion which take into considera�on the
assets, and needs, for a specific place.  Ac�on
is co-ordinated through strong and trusted
partnerships and informed by regular
communica�on with those who live there.   
Mental Health & Wellbeing
During the summer over 1,300 residents took
part in the ‘Take Time on the Road’ roadshow,
focusing on mental health and wellbeing. 
Atendees took part in gaming ac�vi�es,
wellbeing workshops, yoga and a ‘Therapet’
Pe�ng Zone.  Mental health and wellbeing is
a key focus in all of our youth voice, children’s
rights and youth work programmes.  All our
programmes are fully inclusive for all young
people and we specifically support Addi�onal
Support Needs (ASN), Mental
Health & Wellbeing, LGBT
and New Scots, focussing
on tackling inequali�es
and reducing barriers
to par�cipa�on.   
34

Page 35

Our Council Plan Progress Update – Mid Year 2023-24  Page 5 of 33
Our ‘Drama for Wellbeing’ programme took
place during the school holidays.  The
programme saw primary school pupils
working on mini plays while learning about
mindfulness and wellbeing.  Senior secondary
school pupils developed their stage presence
and delivery, presen�ng their own thought-
provoking play focused on the pressures of
modern teenage life.  This ended with a live
performance at the Harbour Arts Centre.
The Ac�ve Schools team has offered a wide
variety of extra-curricular opportuni�es on
offer to all primary, secondary and ASN
establishments.  The work of the Ac�ve
Schools and Communi�es Partnership Officers
has focussed on care experienced young
people and New Scots.  The Ac�ve Schools
Team has further enhanced leadership
opportuni�es to widen achievement by
introducing a new pathway in partnership
with KA Leisure and Ayrshire College.  The sole
focus is the Na�onal Progression Award (NPA)
Fitness Course at Level 6.
Over 11,000 young people accessed holiday
meals provisions over the 2023 summer
holiday period.  
The 2023/24 round of our Par�cipatory
Budge�ng grants programme offers four
separate funds for communi�es to make a
spending decision.  These are ‘Arts & Culture’,
‘Locality’, ‘Youth and UK Shared Prosperity
Communi�es’ and ‘Place’.  A total of £198,377
is available to local organisa�ons.  Full details
of the projects behind the applica�ons can be
found here.
We launched our Science, Technology,
Engineering, and Mathema�cs (STEM) Trail at
Eglinton Country Park to help children
discover and understand STEM concepts using
the outdoor environment as a s�mulus.  
Our North Ayrshire Wellbeing Alliance builds
on extensive exis�ng work to develop the
Wellbeing priority from the Community Plan. 
The work aims to tackle health inequali�es by
co-loca�ng services, delivering preventa�ve
ac�vi�es and strengthening the rela�onship
between health and leisure.  In order to
progress and develop our Wellbeing Alliance,
KA Leisure has been hos�ng a series of
workshops and working group mee�ngs. 
Through this work, a project has been
developed in the Garnock Valley to respond to
an iden�fied need around engaging hard to
reach young people.  
35

Page 36

Our Council Plan Progress Update – Mid Year 2023-24  Page 6 of 33
Public Spaces 
Our play facili�es programme of investment
con�nues to progress.  Building on the coastal
park installa�ons last year the focus has now
moved to inland facili�es with 14 facili�es
upgraded since June.  Officers atend the
Sco�sh Government Play Facili�es Working
Group.  Atending this group gives the service
confidence that play facility upgrades within
North Ayrshire are progressing well.  
We are con�nuing to make play accessible for
all children by installing communica�on
boards in parks.  The boards make a big
difference to youngsters with neurodivergent
condi�ons – including au�sm, dyslexia and
aten�on deficit hyperac�vity disorder (ADHD)
- by giving them images, symbols and paterns
to help them express themselves and
communicate.  They have been installed at
seven key parks and further rollout is being
considered.
This investment programme provides great
facili�es for families and visitors and helps
deliver facili�es that are more inclusive and
accessible.  
Our Enforcement Team worked in partnership
with Police Scotland, Network Rail, Coast
Watch, the Mari�me and Coastguard Agency
and Sco�sh Fire and Rescue to implement the
‘Safer Shores’ programme over the summer. 
This partnership allows visitors and residents
to enjoy our coastal loca�ons safely.  
We are working in partnership with
Strathclyde Partnership for Transport (SPT) on
the Strathclyde Regional Bus Strategy.  This
will undertake a study into rural transport
needs and an appraisal of bus opera�on
models.  We are also suppor�ng their regional
funding bid to Transport Scotland’s
Community Bus Fund to further develop the
strategy.  Access to effec�ve transport is key in
enabling our residents to work, access
facili�es and enjoy social opportuni�es.
In May 2023, Cabinet approved the next steps
for a new Community Transport pathfinder. 
This includes plans for detailed engagement
with local communi�es to understand their
transport needs, as well as explora�on of
poten�al delivery models.  We are working
with the Garnock Valley Locality Partnership
to develop a study that will iden�fy what the
travel challenges and barriers are within the
area, providing an evidence base for
interven�on and offering prac�cal and
realis�c recommenda�ons to help address
these challenges in the locality.  A North
Ayrshire survey will be undertaken to establish
the demand for community transport and
how this could be shaped to meet the needs
of the community.  A further update will be
provided to Cabinet in December 2023.
We have iden�fied improvements to bus stop
infrastructure as part of the recent £146,000
capital award under the Community Bus Fund. 
The fund aims to enable local transport
authori�es to improve local public transport,
with a focus on rural deprived areas where
lower popula�on density means bus services
can be less commercially viable.  These will be
delivered alongside the bus corridor
improvements funded under SPT’s Capital
Programme.
Our Streetscene Service has installed 41
wheelchair accessible picnic benches, 115
new benches and 51 large capacity Nexus
bins.  The picnic benches and benches are
galvanised steel and come with a 15-year
guarantee which helps futureproof our street
assets.  The larger capacity bins have been a
key element in allowing Streetscene to review
schedules for street cleaning, and this will
help balance resources between coastal and
residen�al areas to focus on
achieving improved Local
Environmental Audit and
Management System
(LEAMS) outcomes.  
We con�nue to
support the Bri�sh
36

Page 37

Our Council Plan Progress Update – Mid Year 2023-24  Page 7 of 33
Legion to ensure our war memorials are
presented in the best way possible.  In
par�cular this year, around the Ardrossan War
Memorial and the Dasher Memorial gardens.
Cabinet approved the Regenera�on Delivery
Plan ac�on programme for 2023/24 and
2024/25 alongside the 2023/24 funding
proposals.  This included over £4m funding
under the Place Based Investment
Programme, Cycling Walking and Safer Routes,
Vacant and Derelict Land Fund and SPT’s
Capital Programme.  Addi�onally, a report on
the B714 Upgrade was approved by Cabinet
on 29 August 2023 that approved the
realignment of £5m to support the project.
The Department for Levelling Up Housing and
Communi�es’ (DLUHC), Head of Scotland
Team and Regional Leads visited on 24th
August.  They viewed the projects funded
from the Community Renewal Fund, Shared
Prosperity Fund and Levelling Up Fund.  New
Area Leads are now in place from the
Department of Levelling Up Housing and
Communi�es with an introductory site visit
programme planned for 17th November.  The
third round of Levelling Up Fund (LUF) is s�ll
expected this year, with date to be confirmed.  
Ayrshire Growth Deal
We have reach significant milestones around
the Ayrshire Growth Deal.
A contractor has been appointed to undertake
remedia�on at the Ardrossan Coastal Quarter
site of the future Ardrossan Campus. This is a
key milestone in the wider regenera�on
proposals for the Ardrossan area, and cri�cal
to enabling the development of the Campus.
The i3 Ayrshire Growth Deal Flexible Space
programme has broken ground and
development is underway to provide the first
phase of the commercial advanced
manufacturing space.  This is one of the
leading projects in the Ayrshire Growth Deal
to have reached physical development stage
and will be important to local businesses
providing quality flexible space with low
carbon sustainable design to support high
value jobs in North Ayrshire.  Work has now
also commenced on the design for Phase 2, to
accelerate the programme of delivery.
The Ayrshire Growth Deal programme at
Irvine Harbourside has made significant
progress with the consulta�on on a
masterplan for the area complete and the
appointment of designers to complete a
technical design for the coastal hub playpark
to start on site in 2024.  This represents the
programme moving towards delivery stage,
which will ensure the loca�on maximises its
poten�al as a regional tourism des�na�on,
providing jobs, increased visitors and
improved facili�es.
The Ayrshire Skills Investment Fund has been
approved by the Sco�sh Government and is
now in the implementa�on stage.  An
employer grant scheme has been launched to
support local businesses develop their
workforce with skills for the future in key
sectors.  
A 2023 Visitor Management Plan was
approved, colla�ng the wider range of place-
based services offered throughout our Council
to support and enhance the visitor experience
in North Ayrshire, while minimising the impact
on communi�es.  This provides an overall
investment of over £2m in revenue and capital
investment to support the sector.
A cross-party member/officer working group –
the Tourism Forum – has been formed and
now meets quarterly to oversee strategic
development of programmes and ini�a�ves to
support the tourism sector in North Ayrshire.
Our Council renewed its partnership with the
Crown Estate Scotland to
support con�nued
partnership working to
support coastal
communi�es and
support the
37

Page 38

Our Council Plan Progress Update – Mid Year 2023-24  Page 8 of 33
advancement of Ayrshire Growth Deal marine
tourism projects.
Atainment
Significant work has been undertaken to
con�nue efforts to close the poverty related
atainment gap through finalising plans to
implement a new model for the Professional
Learning Academy.  This model commenced in
August 2023 and ini�al feedback from school
leadership teams highlighted how this is
providing targeted support to raise atainment
and achievement, with a specific focus on
those most impacted by poverty.  
We have gathered evidence on the impact of
planned interven�ons and ini�a�ves during
the 2022-23 academic year.  This is being used
to inform future approaches.  Full details are
available in the Educa�on Services report.
Employability
We currently have 11 Modern Appren�ces
studying for their SVQ Level 3 in Youth Work,
with on-the-job training being provided by our
Modern Appren�ce Co-ordinator.  Our Youth
Work Modern Appren�ce programme is part
of the regular HM Inspectors of Educa�on
(HMIE) Progress Review Visit of Community
Learning and Development which took place
in September.  Results are due in October.
We have con�nued to expand the use of the
Skills Development Scotland Data Hub, which
is leading to further improvements.  For
example, the recently published Annual
Par�cipa�on Measure for 16-19 year olds is
the highest on record for our Council and the
2nd highest increase across all 32 local
authori�es in Scotland.  This is a result of
increased partnership working with members
of the Local Employability Partnership
including Educa�on, Employability, Self-
Directed Support (SDS), Ayrshire College and
Third Sector partners to ensure posi�ve
des�na�ons for all school leavers.
Employability week was held in May 2023 and
the key highlights were:
• 1,000 people atended events across the
week.
• Almost 140 young people atended the
Modern Appren�ceship recruitment day. 
90 applica�ons for Modern
Appren�ceships were received
immediately a�er the event, with 249
applica�ons to date (an increase from last
year).  CEIS also received 30 applica�ons
on the day for their youth employment
support programme.
• The Department for Work and Pensions
(DWP) job fair atracted almost 500
people and, of these, eight people found
work, 34 interviews were arranged or
conducted and 141 job applica�ons were
filled in within the two hours of the event.  
• At the Parent Hub, more than 100 people
atended and four new parents registered
to get support in finding employment.
Community Wealth Building
We are developing a refreshed Community
Wealth Building (CWB) Strategy that focuses
on achieving a wellbeing economy.  This
reflects the significant change in the local,
regional and na�onal economy since the
original strategy was launched, including the
impacts of the Covid pandemic, war in
Ukraine and the cost of living crisis, alongside
a shi� in the na�onal policy environment
towards a wellbeing economy.  This will be
considered by Cabinet in early 2024.
We have led on the development and
approval of the Ayrshire Regional Economic
Strategy (RES) - Delivery Plan for Year One . 
This focuses on actions that can feasibly be
commenced and/or delivered
in Year One.  It recognises
the substantial level of
activity already
underway which
aligns with the
priorities of the RES
38

Page 39

Our Council Plan Progress Update – Mid Year 2023-24  Page 9 of 33
including projects delivered by the Ayrshire
Growth Deal and the pioneering work of the
Ayrshire Community Wealth Building
Commission.  It seeks to build on existing
work, add value and align to the RES priority
themes, in addition to identifying new activity
targeted to achieving the strategy’s long-term
ambitious priorities.  This will be led by the
RES Delivery Group to be formed later in the
year.
Care Experienced Children and Young
People
Following a Council mo�on in March that
agreed care experienced should be treated as
a protected characteris�c in North Ayrshire,
work has been ongoing on the defini�on of
care experienced for use within Equality
Impact Assessments (EIA’s) and Children's
Rights Impact Assessments.  An EIA on the
proposed policy will be presented to Council
later this year alongside an update on the
defini�on and work required to include it
within the EIA template for future policy
changes (including budget proposals).
Our Educa�on Service has increased the
capacity of their Care Experienced Tutor by
extending weekly contracted hours funded by
the Sco�sh Government's Care Experienced
Children and Young People Fund.  Ini�al
evidence of impact of this interven�on is
posi�ve.  
The work to review our Educa�on Quality
Improvement Framework and process for
Establishment Reviews for session 2023/24 is
complete.  There is a renewed focus on
iden�fied target groups including care
experienced learners.  The framework
supports effec�ve improvement planning and
evalua�on and is used to support the quality
improvement agenda in all educa�onal
establishments.  
Addi�onally, we have increased opportuni�es
to further develop mentoring rela�onships
and have plans to increase the use of
Mo�va�on, Commitment and Resilience
(MCR) Pathways next session.  We have
developed a planning document to help target
support and review and iden�fy effec�ve
prac�ce for care experienced learners.  
Wellbeing
Next Steps
• We will increase the use of Mo�va�on,
Commitment and Resilience (MCR)
Pathways next session.
• We will await the results of our Child
Poverty and Cost of Living Board
applica�ons for funding from the Sco�sh
Government Child Poverty Prac�ce
Accelerator Fund and Cash First Fund.  
• We will meet with the Improvement
Service to push forward our data sharing
work following the outcome of our
Sco�sh Government Child Poverty
Prac�ce Accelerator Fund and Cash First
Fund applica�on.
• We will con�nue dra�ing our new
Community Wealth Building strategy
following considera�on by the Policy
Advisory Panel and Cabinet 
• We will present a paper on trea�ng Care
Experienced as a protected characteris�c
to Council later this year.
• We will support SPT with their funding bid
to Transport Scotland to further develop
the Strathclyde Regional Bus Strategy.
• We will update Cabinet on progress on the
Community Transport pathfinder in
December 2023. 
39

Page 40

Council Plan Progress Update – Mid Year 2023-24  Page 10 of 33
Case Study – Townend Skills Hub
Greenwood Academy needed a space outside the school that could be used for learning
ac�vi�es for young people who find being in a school environment difficult.  School staff
approached our local Community Learning and Development team for support.  They
iden�fied Townend Community Centre in Dreghorn as a poten�al venue for a community
café.  This would link community groups, the community associa�on and the school.
In a pilot project before the
summer holidays, our young
people served around 40
customers.  The young people
involved were consulted on what
their expecta�ons would be of the
project and how they would
expect to benefit from it in terms
of preparing them for the world of
work.
At the end of the pilot an
evalua�on was undertaken with
our young people who were
involved.  All of them valued the
project and engaged really well –
more so than if it had been
delivered in the school.  
Some preferred it to the school environment because it was quieter, more approachable and
easier for them to engage with.  Several teachers from Greenwood Academy have visited the
space and there is excellent support from both them and the senior management team in
the school to con�nue the project.
Future plans include expanding the project to include provision for parents to atend adult
learning classes, provide volunteer
opportuni�es for people of all ages
and offer targeted support to 16 – 24
year olds who are not currently in
work.   Our Community, Learning and
Development team
con�nue to work
with the school
and
community
partners to
progress this.
40

Page 41

Our Council Plan Progress Update – Mid Year 2023-24  Page 11 of 33
Communi�es and
Local Democracy
Key Activities
Partnership Working
Our Officers have been engaging with The
Ayrshire Community Trust (TACT), and their
regional wider Ayrshire counterparts, to
ensure Third Sector representa�on on the
Regional Strategy Delivery Group which will
promote opportuni�es for community
organisa�ons to achieve their goals.
We have been working alongside the Third
and Voluntary Sector through the Child
Poverty and Cost of Living Board and
associated mini enquiries.  A Childcare Mini
Enquiry took place on 25th May 2023. 
Approximately 50 people from a variety of
community groups, Council services and
partner organisa�ons atended the event
which shared ideas and informa�on.  Groups
on the day held around the table discussions
on what is going well, what can be improved
and what gaps exist in provision.  Areas
discussed included:
• A need to improve the registra�on
process for Early Years services.
• A need to increase awareness of
en�tlement to early years provision.  
• A requirement for more breakfast
opportuni�es, ensuring they are
affordable and available across North
Ayrshire.
• A shortage of registered childminders.  
Several links are in place with North Ayrshire’s
Third Sector Interfaces (TSI) across the
Community Planning landscape.  The TSI is
currently Chair of the North Ayrshire
Community Engagement Network.   The Chief
Execu�ve of TACT has taken on the role of
Chair for the Community Planning Partnership
(CPP) Senior Officer’s Group.  
Ac�ve Involvement
We have recently relaunched our Housing
Services’ Customer Par�cipa�on Strategy for
2023 – 2028.  This will ensure that our
communi�es are involved in decision making
and are empowered to influence how we
deliver our Housing Service.  Three priori�es
have been iden�fied to ensure this happens.  
• ‘Engage and Inform,’ focuses on
communica�ng with, consul�ng and
including our customers. 
Ensuring there is two-
way communica�on
with our tenants
and customers
and providing
opportuni�es for
41

Page 42

Our Council Plan Progress Update – Mid Year 2023-24  Page 12 of 33
customers to take part in ways that meet
their needs.  
• ‘Empower and Influence,’ focuses on
building community capacity, encouraging
and suppor�ng customers to take part,
and helping them to influence decision
making.  
• ‘Evolve and Innovate’ focuses on the
con�nuous improvement and
development of our service to best meet
the needs of our customers.
We con�nue to work directly with island
communi�es to develop and facilitate the
implementa�on of the Ten Year Island Plans
for Arran and Cumbrae.  This has included
suppor�ng Arran to develop three theme
groups under an 'Island in Balance' approach
of Economy, Community and Environment. 
On Cumbrae, we have worked with the Island
Plan Steering Group to progress the ‘Carbon
Neutral Islands’ project in addi�on to
developing governance arrangements and
crea�ng a fortnightly island presence to
support opportuni�es for direct engagement.
Community Planning Partnership
The second phase of Democracy Maters will
give people across Scotland the opportunity
to come together in their communi�es to
imagine how new and inclusive democra�c
processes can best help their town, village or
neighbourhood.  Discussions on Democracy
Maters Phase 2 have already taken place at
the CPP Senior Officers Group and the North
Ayrshire Joint Youth Forum, with a further
session planned for the Community
Engagement Network.  
The June Community and Locality Planning
training session received posi�ve feedback
from par�cipants including community
members, partner organisa�ons and Elected
Members.  Several partner outreach sessions
have taken place this year, including Police
Scotland and Sco�sh Fire and Rescue
colleagues, KA Leisure and Public Health.  
There con�nues to be significant development
around the structure and content of our
Locality Partnership agendas to ensure
stronger links to partnership, reducing
inequali�es and addressing local priori�es.
The Community Plan (LOIP) for 2022-30 has
been refreshed to ensure it is clearer and
more engaging for our communi�es and
partners.  This has included a redesign and
update of data.  Engagement with young
people around the plan is in progress.  The
results of this will be used to inform our
approach to including young people
throughout the lifespan of the Community
Plan as well as a ‘Plan on a Page’ aimed
specifically at children and young people.  
Locality Planning con�nues to develop across
North Ayrshire with partners becoming even
more embedded in the locality model.  Six
refreshed Locality Plans have been co-
produced with Locality Teams and will be
approved by the Locality Partnerships at their
December 2023 mee�ngs.
Our Community Planning Twiter account
con�nues to grow with over 800 followers and
more than 14,000 impressions since the last
quarter.  
28 Community “wishes” have been delivered
in 2023 so far through the Community
Benefits Wishlist.  This links needs in
communi�es with businesses delivering
contracts and ensures community benefit is
directed in the way which makes the most
impact.  In total, 61 “wishes” have been
delivered since the Wishlist was launched in
October 2021.  
42

Page 43

Our Council Plan Progress Update – Mid Year 2023-24  Page 13 of 33
Communi�es and
Local Democracy
Next Steps
• We will con�nue the development of the
Par�cipa�on Strategy and new
Community Planning Partnership website
and Community Directory.  
• We will con�nue the development of the
new Community Planning website,
including a consulta�on list, events
calendar and online resources and
signpos�ng for staff, partners and
community members.
• We will con�nue to plan for our 2024
Community Planning Conference, which
will focus on Democracy Maters Phase 2.  
• We will hold mee�ngs in October and
November to provide feedback on our six
refreshed Locality Plans and seek approval
for the Plans at the December 2023
Partnership mee�ngs.
• We will con�nue our engagement with
young people around the Community Plan
(LOIP). 
• Will con�nue to develop our Performance
Management and Quality Assurance
Framework for our Advice Services.
• We will con�nue to develop our
consulta�on budget tool for the 2024/25
budget.
• We will con�nue to develop the online
Community Directory tool with a view to
launching in Winter 2023 along with the
new Community Planning website. 
43

Page 44

Our Council Plan Progress Update – Mid Year 2023-24  Page 14 of 33
Case Study – Irvine Tennis Club
Irvine Tennis Club had a vision to revamp tennis courts in Thornhouse Avenue.  Irvine
Locality Partnership worked with the tennis club for the club to take on ownership through
community asset transfer of the courts from our Council to the Club.  We also provided help
and support to access funding.
Our Irvine Locality Officer supported the organisa�on to submit an expression of interest to
their Locality Partnership.  Irvine Tennis Club was invited to progress to the next round to
submit a full applica�on and deliver a presenta�on to the Partnership of the proposals.
Support to access funding was made available to the club and they were successful in
achieving a range of funding:  
• Common Good Funding £25,000
• North Ayrshire Ventures Trust £30,000
• Community Investment Fund £100,000
• Sports Scotland £100,000
This funded the resurfacing and
development of addi�onal tennis
courts, fencing and flood lights to
allow access and con�nued use in
winter months.
Irvine Tennis Club intend to build a
new club house which will host a
social area, toilets and changing
area with showers.
The Club has reinvigorated the
tennis courts in Irvine to enable the
community to come together to
enjoy playing tennis and other
games within the refurbished tennis courts.  They are now of a standard to enable the club
to compete as well as enable their community to use a safe year-round facility.  
Irvine Tennis Club welcomed Judy Murray to open the courts on 11th September – video of
the moment can be viewed online here.  The commitee have all worked hard, coming
together to take ownership of a community asset and turn old red ash pitches into state-of-
the-art tennis facili�es for the whole community.
The Club opened the courts up for community use at the end of
summer and already have over 70 members.  The Club has formed
many partnerships with community groups who have all expressed an
interest in a variety of ac�vi�es on offer at Irvine Tennis Club.
44

Page 45

Our Council Plan Progress Update – Mid Year 2023-24  Page 15 of 33
Climate Change
Key Activities
Energy
Work con�nues on the installa�on of two new
solar farms at former landfill sites in Irvine and
Kilwinning.  The projects both reached the
final detailed design stages and are scheduled
to commence construc�on in early 2024.  The
new solar farms will make a major
contribu�on to renewable energy genera�on
and carbon reduc�on, as well as bringing
sterile land back into produc�ve use.  
A detailed feasibility study for further
renewable energy at the i3 site in Irvine was
also completed, and officers are working on
developing a detailed business case for
considera�on, aligned to wider investment
proposals at the site.  
A new £350k Community Net Zero Carbon
Fund was launched, enabling local community
groups to bid for funding to help with
feasibility and/or installa�on of renewable
energy technologies on land or buildings they
own.  Officers are assessing the ini�al tranche
of applica�ons.
As part of our annual investment programme,
residents from a total of 900 Council owned
homes are expected to benefit from the
adop�on of various energy efficiency
measures, including external wall insula�on
and solar panels, as we invest to meet the
new Energy Efficiency Standard for Social
Housing 2 (EESSH2).  
A study to understand the investment
requirements for decarbonisa�on of Council
buildings has been commissioned, and will
help set out the measures, funding and
�melines required to meet our own net zero
targets and wider, na�onal 2038 public sector
building decarbonisa�on commitment.  The
high-level results of the study are expected in
January 2024.
Finally, work to develop our Local Heat and
Energy Efficiency Strategy and Delivery Plan
(LHEES) is nearing finalisa�on, with the new
LHEES due for publica�on in January 2024. 
The LHEES is designed to be at the heart of a
place based, locally led and tailored approach
to the heat transi�on.  These local strategies
will cover all of Scotland and underpin an
area-based approach to heat and energy
efficiency planning and delivery. Since April,
Home Energy Scotland have supported 2,611
households with energy efficiency advice. 
Transport 
Officers con�nue to work in partnership with
the Ayrshire Roads Alliance to develop the
new Ayrshire Electric Vehicle Pathfinder which
is set to bring £5m public electric vehicle
charging investment into Ayrshire to deliver
300 new chargers, subject to external funding. 
This is an exci�ng next step in helping
residents and businesses transi�on to electric
vehicles, by providing a well-distributed,
affordable and reliable public charging
network.  
A new route map for the decarbonisa�on of
our Council vehicles has priori�sed how we
will reduce emissions across our fleet.  This
includes a commitment that we will not
purchase any new fossil fuel powered
passenger or Light Commercial Vehicles
(LGVs), two years ahead of the 2025 target set
out in the Programme for Government.  
We are commited to improving knowledge
and a�tudes about sustainable transport
choices through the Trinity Ac�ve Travel Hub
and our Travel Smart programme.  This
includes working with organisa�ons and
volunteers to provide ac�ve travel ac�vi�es
across the area and our workplace
engagement programme
working with local
employers.  Ac�vi�es
delivered, included
personalised travel
planning, bike
maintenance classes
45

Page 46

Our Council Plan Progress Update – Mid Year 2023-24  Page 16 of 33
and challenges such as ‘Cycle to Work
September’.  We con�nue to update and
promote our Ac�ve Travel Hub social media
pages to raise awareness.  
Regenera�on projects that have commenced
this year include: 
• Construc�on of the North Crescent
Coastal Path Phase 1, Ardrossan.  
• An op�ons appraisal study for the
Valefield Bridge, Kilbirnie to help re-
establish this important ac�ve travel link.  
• Fairlie Coastal Path Phase 3 with
construc�on expected to start in Q4.
• Detailed design stage for Largs Promenade
Ac�ve Travel Study.
• Feasibility study for Cumbrae Ac�ve Travel
Link.
• Design of Old Caledonian Railway Path
Phase 2.
The following projects have been completed:
• Upgrade of the Harbour Path, Ardrossan
linking between the town centre and ferry
terminal.
• Design of the North Crescent Coastal Path
Phase 2, Ardrossan with funding for
construc�on secured from Sustrans. 
• Improvements to five separate path links
in Ardrossan, Saltcoats and Stevenston.  
• Upgrade of Old Caledonian Railway
Cu�ng, Saltcoats (Phase 1).  
• Upgrades to bus stop shelters to promote
walking to public transport.
Environment
Our Streetscene Service con�nues to support
volunteering groups.  Following nomina�ons
from volunteer groups, Elected Members and
the general public, a recogni�on event was
held at Saltcoats Town Hall to recognise the
contribu�on of our volunteers, par�cularly
young environmental ambassadors.  There
were 64 atendees with five awards presented
to the young environmental ambassadors for
various ac�vi�es, such as liter picking and
making hor�cultural enhancements in their
local areas.  Through working with volunteers,
issues and solu�ons are iden�fied, such as
litering of disposable vapes.  We worked with
the Irvine Clean Up Crew to provide an
appropriate disposal solu�on.
Our Environmental Enforcement Team are
working on a ‘Sea Starts Here’ campaign to
educate our residents and raise awareness of
liter being placed into drains and waterways,
which ul�mately leads to pollu�on of our
waterways and coastal loca�ons.  
Our ‘Intermediate Labour Market’ (ILM)
ini�a�ve has provided extra capacity and
enabled a focus on the ensuring paths are
edged and encroachment is cut back on our
cycle network to enable our residents to
access zero carbon travel.  
Successful bids for ‘Food for Thought’ grants
were evaluated effec�vely by a number of
North Ayrshire schools.  They are individually
inves�ga�ng the adop�on of low carbon
behaviour change in their communi�es.  
Our Climate Ac�on Town Stevenston Project
launched a�er successful funding from the
Chartered Ins�tute of Library and Informa�on
Professionals in Scotland (CILIPS).  This will
offer a series of climate and environmental
themed ac�vi�es for schools, families and the
local community in the library and
surrounding area, including climate cinema
screenings, climate classroom, eco-learning
ac�vi�es and outdoor learning.  Our
Streetscene Service has been working with
the friends of Kirkton Hall Glen to further
enhance the biodiversity of the area and
involved the local primary school in seeding of
the wildflower meadow in prepara�on for the
2024 growing season.  This project
has helped to bring
biodiversity into the school
curriculum, suppor�ng
learning outcomes and
the biodiversity of the
local area.  
46

Page 47

Our Council Plan Progress Update – Mid Year 2023-24  Page 17 of 33
Our North Ayrshire 2030 Woodland Project is
progressing well with 35,627 new trees
planted.  The target is to plant 108,000 new
trees by 2030.
Reuse and Recycling
Waste Services worked alongside our
Economic Development team to outline
op�ons and recommenda�ons for a poten�al
‘remakery’ project to increase re-use and
repair across North Ayrshire.  The study
recommended op�ons to be progressed in
line with the new Shared Prosperity Fund
programme.  
Our Council's bulky waste reuse partner,
Cunninghame Furniture Recycling Company
(CFRC), collected 107 reusable matresses (1.3
tonnes) from April to September 2023, as part
of the ini�a�ve to promote opportuni�es for
their reuse along with 97.6 tonnes of
household furniture that would otherwise
have been disposed of.  
An Elected Members development session
took place on 20th April 2023 to discuss some
of the key drivers for increasing reuse and
recycling performance.  The Sco�sh
Government has published a dra� Circular
Economy (CE) Bill, which is expected to
become law by May 2024, with a further
consulta�on expected on their Waste Route
Map in the coming months.  The dra� CE Bill
and the Route Map consulta�on will be used
to inform the development of a new Zero
Waste Strategy.  We will schedule further
consulta�on sessions as part of the
development process.
Adapta�on
Our Council is undertaking Adapta�on
Scotland’s Capability Framework in order to
improve North Ayrshire’s resilience to climate
change.  The framework iden�fies four
capabili�es needed for an organisa�on’s
adapta�on journey.  The first internal self-
assessment was undertaken in a workshop
environment, with representa�ves from
services cross our Council and support from
Adapta�on Scotland.  The group iden�fied
evidence for the benchmarking tool, crea�ng
a baseline assessment of the current status.  A
proposed list of ac�ons was also iden�fied
which have been progressed over this period. 
The ac�ons are:
• Create and maintain a Council wide library
of climate change and adapta�on case
studies.
• Inves�gate poten�al of introducing a
climate change (adapta�on) risk
assessment template for strategic
organisa�onal risks.
• Raise awareness via a staff eLearning
module on climate change and
adapta�on.
47

Page 48

Our Council Plan Progress Update – Mid Year 2023-24  Page 18 of 33
• Build external capacity to share
understanding on climate change and
adapta�on.  
• Improve repor�ng by recording evidence
and measure outcomes in rela�on to
climate change and adapta�on.  
• Undertake annually the Adapta�on
Capability Framework and Benchmarking
Tool assessment to review Council wide
progress.
Suppor�ng Local Businesses
The Corporate Procurement Unit (CPU) work
closely with the Business Support and
Development Team, to iden�fy local suppliers
to invite them to quick quote.  We can now
confirm local spend for 2022/23 was £57.7
million (26% of total spend) and £2.7 million
worth of Quick Quotes were awarded locally.  
Our Business Development Team has
supported 83 businesses with a range of
ac�vi�es to reduce their environmental
impact including awareness raising,
consultancy support, green event hos�ng,
grant support and referrals to partner
organisa�ons.  We have also directly funded
17 businesses to par�cipate on the Net Zero
Accelerator programme.  This will seek to
provide the individual businesses with advice,
support and informa�on rela�ng to reducing
(and measuring) their environmental impact. 
It runs over a 12-month period and evalua�on
of the impacts will be undertaken during and
at the conclusion of the programme.  
The Communi�es and Place Fund was
approved by Cabinet on 30th May.  The Fund
was developed with input across services, the
Ayrshire Community Trust and Arran Council
for Voluntary Services and reviewed by the
Policy Advisory Panel.  It is comprised of a
compe��ve grant fund and Par�cipatory
Budge�ng (PB) fund.  The compe��ve grant
fund opened to applica�ons on 21st June. 
Nine awards were made to projects across
North Ayrshire, with a total value of £160,330. 
Unsuccessful applicants have been given
support and advice to beter posi�on their
applica�ons to reapply next year or pursue
alterna�ve funding sources.  The PB fund is
underway with awards being made later this
year.
Climate Change
Next Steps
• We will publish our new ‘Sustainable
North Ayrshire’ Strategy.
• We will publish our new Local Heat and
Energy Efficiency Strategy.
• We will progress to construc�on stage for
our new solar farm projects.
• We will launch new energy efficiency
measures offer as part of our Energy
Smart programme.
• We will con�nue the development of a
new Zero Waste Strategy.
• We will progress the procurement
exercise for the new Ayrshire Electric
Vehicle Charging Infrastructure project.  
• We will progress with our fleet
decarbonisa�on route map, including
explora�on of a hydrogen produc�on
feasibility study.  
• We will con�nue the construc�on of the
North Crescent Coastal Path Phase 1,
Ardrossan.  
• We will present our Local Transport and
Ac�ve Travel Strategy to Cabinet in
October.  It will provide a framework for
investment and decision-making in
transport for the benefit of our residents,
visitors and businesses up to 2028.  
• We will complete and submit our
statutory Biodiversity Duty report to the
Sco�sh Government in January.
48

Page 49

Council Plan Progress Update – Mid Year 2023-24  Page 19 of 33
Case Study – Ac�ve Travel
Several Ac�ve Travel projects took place during the summer months to encourage
sustainable travel.  Our Ac�ve Travel and Communica�ons Teams worked closely together to
promote the ac�vi�es, genera�ng significant interest from across our area.
Public Engagement on Ac�ve Travel Op�ons on
B777 between Beith and Kilbirnie 
In May this consulta�on on proposed
improvements to the B777 to provide walking,
cycling and wheeling opportuni�es, gained a
great deal of interest.   104 people took part in
the survey and there were 57,400 views of the
informa�on and 2,556 interac�ons on social
media.
Family Cycle Event at the Circuit
400 people atended this event at our newest
spor�ng and leisure facility in June following
significant promo�on through social media, press
releases, community radio, poster and leaflet
distribu�on as well as internally to our own
employees.  Held as part of the na�onwide
‘power of the bike’ campaign to promote the UCI
Cycling World Championships in Glasgow, the event enabled residents to try-a-bike, access
free safety checks and bike loans.  As a result, 400 people atended the event and there
were 22,000 views of the informa�on on our social media channels.
Cycle Maintenance Drop-In Sessions
38 people atended the sessions during August and September to help our communi�es get
their bikes ready for autumn.  Held across North Ayrshire, the sessions empowered residents
by teaching them how to care for and make minor repairs ‘on the go’ to their bicycles.  In
addi�on, accessible cycle routes and cycling sessions to build confidence were promoted. 
We received over 16,900 views of the informa�on and 283 interac�ons on social media.
Ayrshire Walking Fes�val
This pan-Ayrshire event was organised and promoted by our Ac�ve Travel Team.  186 people
atended events during the fes�val - an increase on the previous year despite a more
compact schedule. 
Through these ac�vi�es we can see that there is a
significant level of engagement with learning more about
ac�ve travel in North Ayrshire.  This is very posi�ve in
terms of working with our communi�es to deliver our
Climate Change priority.
49

Page 50

Our Council Plan Progress Update – Mid Year 2023-24  Page 20 of 33
A Sustainable
Council
Key Activities
Our Council Plan 2023-28
Our Council Plan 2023-28 was approved by
Council in June 2023.  Developed alongside
our communi�es, our Council Plan vision
remains ‘A North Ayrshire that is fair for all’. 
Our mission is ‘Working together to improve
the lives of our people in North Ayrshire’.  This
shows how we view our plan as a contract
with our communi�es, hence “our” plan.  It
aims to con�nue a culture of con�nuous
improvement by ensuring everyone working
in and alongside our Council is focussed on
improving the lives of the people we serve.
The first annual Best Value Thema�c Approach
Audit is in progress.  This approach replaces
the previous five-yearly audits.  The Best Value
theme for this year is “Leadership of the
development of new local strategic priori�es”,
focussing on the development of our new
Council Plan 2023-28.  The Best Value report
will be appended to the Annual Audit Report
and will be presented to our Audit and
Scru�ny Commitee in November.  
Tackling Digital Exclusion 
Our Council secured an award of £242,000
from the UK Government's Department for
Science, Innova�on and Technology (DSIT). 
This funding comes as part of the
commitment to advancing wireless
infrastructure and 5G technology.  We were
one of six successful local authori�es and the
only one in Scotland.  
A regional bid was submited to DSIT’s £40
million 5G Innova�on Regions (5GIR)
programme in September with South and East
Ayrshire Councils, with a decision from the UK
Government due at the end of October.  
The Digital Economy Skills Group: a sub-group
of the Ayrshire Skills Group con�nues to work
with partners and have agreed three priority
areas for 2024.  These are to: 
1) Develop a Digital Skills Collabora�on Pilot
with key stakeholders to help streamline
support and collec�vely understand and
address the challenges facing our digital
economy and align with the new Skills
Development Scotland Digital Economy
Skills Ac�on Plan (DESAP).
2) Undertake Digital Economy
Industry/School engagement.
3) Undertake Digital Skills Mapping.  
Effec�ve Financial Management
The budget process for 2024/25 has
commenced and includes a focus on the
alignment of strategic investment
opportuni�es linked to our Council’s key
priori�es outlined in our new Council Plan
2023-28.  For example, the Nethermains /
Shewalton solar investment linked to our
Council's focus on achieving Net Zero as well
as significant capital investment across flood
management and decarbonisa�on of our
Council fleet.  
There is ongoing discussions and progress
around various areas of financial flexibility
with the Sco�sh Government, including
poten�al changes to Council Tax through the
mul�plier and second homes levy. 
Discussions con�nue on the feasibility of a
tourist visitor levy and budget discussions on
the Verity House agreement, and what this
means within the context of budget
condi�ons.  
Further progress has been made with lease
income genera�on from commercial
proper�es and the non-
commercial property
por�olio will now focus
ini�ally on an Irvine
locality office
accommoda�on
50

Page 51

Our Council Plan Progress Update – Mid Year 2023-24  Page 21 of 33
review which is being managed through the
Transforma�on Board.  
In May 2023, Cabinet approved the
submission of two applica�ons to the Vacant
and Derelict Land Investment Programme.
Both applica�ons, Kyle Road and 36 Bank
Street were invited to submit Stage 2
applica�ons, due 17th November 2023.
Further feedback has been requested to
strengthen the Stage 2 submission.
Our Workforce
The Modern Appren�ceship recruitment
exercise has been undertaken and various
departments have welcomed these new
recruits to their teams.  In September a cohort
of Graduate Appren�ces from various
directorates across our Council started their
courses at the University of the West of
Scotland as part of our Council's workforce
development commitment.  
Cra� Appren�ceships con�nue to be
successful within our Council, with a new
annual intake commencing earlier in the year.
Six-monthly Workforce planning mee�ngs at a
Service level have been completed and plans
updated.  Methodology and tools to aid
analysis and review of data are embedded in
this process to inform decisions.  A PESTLE
analysis approach is u�lised to provide insight
into factors that will impact on workforce
planning.  
We launched a programme to reshape our
workforce in line with financial planning needs
in early May.  This will be concluded by March
2024.   
A Sustainable
Council
Next Steps
• We will review and implement any ac�ons
following our Best Value report due to be
published in November.
• We will support our External Auditors in
the audit of the next Best Value Thema�c
Approach early in 2024, focussing on
workforce innova�on.
• We will con�nue to engage with the Island
Plan Delivery and Steering Groups to
shape the annual ac�on plans for the
Island Plans.
• We will seek further feedback that has
been requested to strengthen the Stage 2
submissions for Kyle Road and 36 Bank
Street.
• We will await the third round of the
Levelling Up Fund.
• We will await the decision from the UK
Government on the regional bid
submited to DSIT’s 5G Innova�on Regions
(5GIR) programme with South and East
Ayrshire Councils.
• We will await the comple�on of The
Digital Connec�vity Maturity Assessment. 
51

Page 52

Our Council Plan Progress Update – Mid Year 2023-24  Page 22 of 33
Case Study – Our Council Plan 2023-28 
We developed Our Council Plan 2023-28 together, it is
our living contract with our communi�es, it is ‘our’
joint plan, ‘Our Council Plan’. 
Many of the challenges North Ayrshire experiences are
complex and longer-term solu�ons are required to
address them sustainably.  As a result, each Council
Plan is designed to build on the progress of the
previous plan, always with a focus on improving the
lives of our residents. 
Our aim remains to achieve ‘A North
Ayrshire that is fair for all’ and our
mission is ‘working together to
improve the lives of our people in North Ayrshire’. 
Consulta�on was at the heart of our developing our new Council Plan.  
In January 2023 the Leader of the Council, the Chief Execu�ve and Chief Officers held in-
depth discussions with community group representa�ves across all six locali�es to ensure
our Council Plan reflected the priori�es of local residents.  We also invited views through a
joint Council Plan and Budget 2023/24 survey, atrac�ng 1,400 responses.   We worked with
Communica�ons, the Customer Contact Centre, the Community Learning and Development
Team, the Educa�on Service, Library Service and specialist Engagement Officers within the
Council to ensure as many of our residents as possible had the opportunity to have their say.
We offered Bri�sh Sign Language interpreters on request at events, induc�on hearing loops
and informa�on in alterna�ve languages.
Real lived experience is the best way to
inform what we do.  Since October 2022 we
have held a series of mini enquiries directed
by our Child Poverty and Cost of
Living Board to discuss and
inform our approach to
addressing Child
Poverty.  These
events have included
public, private and
52

Page 53

Our Council Plan Progress Update – Mid Year 2023-24  Page 23 of 33
third sector partners, alongside representa�ves from our communi�es, enabling honest
conversa�ons about challenges and how they could be addressed.  These directly informed
both our recent Child Poverty Ac�on Plan and the Council Plan, par�cularly within the
‘Wellbeing’ and ‘Communi�es and Local Democracy’ priori�es. 
Internal consulta�on included Chief Officer Development Workshops as well as discussion at
the employee Leadership Conference and the Execu�ve Leadership Team mee�ngs.
All of this engagement was added to earlier consulta�ons that took place for the Community
Plan (Local Outcomes Improvement Plan), Health and Social Care Partnership Strategic Plan,
Locality Partnership Plans and Island Plans.  It was considered alongside the Strategic Needs
Assessment undertaken for the Health and Social Care Partnership Strategic Plan and the
People’s Panel Survey 2022.  This ensured we gathered as wide a range of views as possible
while minimising duplica�on.  
The views from the consulta�on exercises were used to shape our four priori�es (see image
below) which were therea�er shared with our Modern Appren�ces (aged 16 to 24 years) in
April 2023 for their comments.  They confirmed that the dra� priori�es are “the most
important and crucial” to them and were sa�sfied that
the language and layout of the plan is clear,
straigh�orward and easy to read.  They provided
very helpful guidance on providing effec�ve
and relevant feedback on progress and we
will con�nue to work with them. 
Our Council Plan has also been informed
by use of data including that rela�ng to
popula�on decrease and demographic
change, child poverty, the Sco�sh Index
of Mul�ple Depriva�on as well as data
on climate change. The financial
sustainability of the Council is essen�al to
the future delivery of services and due
regard is therefore paid to that as a priority
so we can con�nue to work in partnership to
meet the needs of our communi�es.   
Now Our Council Plan 2023-28 is approved, we are focussing
on delivering on our priori�es.  If you have any ques�ons or
comments, please contact the Corporate Policy,
Performance and Elec�ons Team on 01294 310000 or
email NorthAyrshirePerforms@north-ayrshire.gov.uk.
53

Page 54

Our Council Plan Progress Update – Mid Year 2023-24 Page 24 of 33
Audits, Inspec�ons and Accredita�ons 
Our Council's External Audit of the accounts and wider scope Audit is due to be presented at the
Audit and Scru�ny Commitee in November.  This includes the first in the new Best Value Thema�c
Approach audits, replacing previous five yearly audits.  Best Value is a statutory duty that ensures we
are always striving to improve, have effec�ve governance, strong leadership and work closely with
partners (in par�cular our communi�es) to inform decision making.  
In this new annual approach, each year the Accounts Commission will decide on a par�cular theme
to form the basis of the Best Value Thema�c Audit in all 32 Sco�sh local authori�es that year.  This
will enable effec�ve benchmarking and scru�ny of our performance by comparing our audit report to
other councils.  Previously audits were staggered, rather than synchronised, across local authori�es.
The Best Value theme for this year is “Leadership of the development of new local strategic
priori�es”, focussing primarily on the development of our new Council Plan 2023-28 and the
involvement of our communi�es in developing our priori�es.  Once published, we will consider any
recommenda�ons and develop an ac�on plan.
The Corporate Procurement Team is currently undertaking a Procurement and Commercial
Improvement Programme (PCIP) assessment with the outcome being determined later in the year.
Our Community Learning and Development services are currently undertaking their regular HM
Inspectors of Educa�on (HMIE) Progress Review Visit of Community Learning and Development. 
Results of the inspec�on are due to be published in October.
Schools are subject to periodic external evalua�on by the na�onal inspec�on agency, Educa�on
Scotland.  Early Learning and Childcare se�ngs are inspected by both Educa�on Scotland and the
Care Inspectorate.  Recently eight educa�onal establishments were inspected by Educa�on Scotland
and the Care Inspectorate, who found the very posi�ve performance within our schools and Early
Years centres.  Ac�on has been taken to celebrate strengths and address areas for improvement
iden�fied in the inspec�on reports.  Reports have been published on the Educa�on Scotland and
Care Inspectorate websites. 
Our Council is undertaking Adapta�on Scotland’s Capability Framework in order to improve North
Ayrshire’s resilience to climate change.  The framework iden�fies four capabili�es needed for an
organisa�on’s adapta�on journey.  The first internal self-assessment was undertaken in a workshop
environment, with representa�ves from services cross our Council and support from Adapta�on
Scotland.  Full details are included in our Climate Change sec�on above. 
54

Page 55

Our Council Plan Progress Update – Mid Year 2023-24 Page 25 of 33
Performance Summary 
There is a high number of performance indicators (16 PIs) where the current status is unknown.  This
is due to the �ming of the performance management framework in August following approval of the
Council Plan meaning se�ng targets, par�cularly for newer PIs, with only a month le� in the quarter
would not have been best prac�ce.  However, targets where appropriate were set for year-end (see
Performance Indicators sec�on below).  
Progress against the annual targets gives confidence that performance is on schedule, with some
areas such as the number of unemployed people progressing into employment already exceeding
their annual target at mid-year (652 against a target of 450).  Our Street Cleanliness score shows we
have performed better than expected at 90.1% against a target of 87%.  Participatory Budgeting is
currently sitting at 2.06% to date, ahead of the 1.5% target for Quarter two and year end.
Other areas include the number of empty properties brought back into use and number of new build
properties (all tenures) which are progressing at over 50% of target at mid-year, though these may
be subject to seasonal fluctuations later in the year. 
Measures adrift of target
This sec�on details the performance indicators adri� of target and the ac�on being taken to address
performance.  Due to expected data lags the most recent data may relate to previous �me periods
but may only now be available to report.  To avoid duplica�on, only data that has not previously been
reported to our Cabinet is included in this sec�on.
At mid-year, the statuses of all PIs within our new Council Plan are either on target (7) or have
previously been reported under our previous Council Plan at Year-End 2022-23.
On Target, 7,
27%
Slightly Adrift of
Target, 3, 11%
Data Only /
Status Unknown,
16, 62%
Performance Indicators
On Target Slightly Adrift of Target
Significantly Adrift of Target Data Only / Status Unknown
On Target,
46, 100%
Actions
On Target Slightly Adrift of Target Significantly Adrift of Target
55

Page 56

Our Council Plan Progress Update – Mid Year 2023-24  Page 26 of 33
Performance Indicators
The Council Plan Performance Management Framework was approved by Cabinet on 29th August 2023.  As a result, it wasn’t feasible to set meaningful targets for Quarter 2
(end of September) for some indicators.  The Annual 2023/24 target is included to help support scru�ny of performance.
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
Q2
2023/24
Value
Q2
2023/24
Target
Q2
2023/24
Status
2023/24
Target
CP_36 Number of residents participating in
community learning and development
activity including youth work*   
17,269   17,804   16,503   18,700
CP_04 Proportion of children meeting
developmental milestones (LGBF)** 82.2%   78.7%  
Data
Available
February
2024  
Measured
Annually   79%
CP_37 Average total tariff score of pupils
living in SIMD 20% most deprived areas 724   711  
Data
Available
March 2024  
Measured
Annually   714
CP_06 Average tariff score: All Leavers 912 900  905.6 880 
Data
Available
March 2024  
Measured
Annually   908
CP_38 Average total tariff for Care
Experienced Young People 448   457  
Data
Available
June 2024  
Measured
Annually   465
CP_07 Percentage of school leavers
entering positive destinations (LGBF) 95.2% 96.2%  96% 93.5% 
Data
Available
February
2024  
Measured
Annually   96.4%
CP_39 Number of unemployed people
progressing into employment 285 200  524 450  437   652   450
CP_10a Percentage of procurement spent
on local enterprises 21.39% 23.5%  22.93% 24%  26.04% 25%  Measured
Annually   26%
56

Page 57

Our Council Plan Progress Update – Mid Year 2023-24  Page 27 of 33
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
Q2
2023/24
Value
Q2
2023/24
Target
Q2
2023/24
Status
2023/24
Target
CP_40 Number of new build housing units
reaching completion (all tenures) (Actual
not cumulative)*      
562   223   295
CP_41 Number of empty homes brought
back into use (Actual)*** 122   335   120    180   200
CP_28 Hectares of vacant & derelict land in
North Ayrshire 1,204 1,194  1,198 1,144  Data
pending 1,094  Measured
Annually   1,094
CP_27 Street Cleanliness Index –
Percentage Clean (LGBF) 91.34 94  86.7 94  84.6 90  90.1%   87%
CP_20 Overall percentage of road network
that should be considered for maintenance
treatment
37.1% 38.1%  33.9% 37.5%  34.8% 33.8%  Measured
Annually   34.8%
CP_42 Provided floor space of
commercial/industrial space within our
Council portfolio (sq ft)*      
400,991   Measured
Annually   404,755
CP_02 Percentage of Council budget
directed via participatory methods 1.13% 1.2%  2.32% 1.1%  2.74% 1%  2.06% 1.5%  1.5%
CP_43 Number of Council assets under
community management (cumulative)*       49   51   54
CP_30 Total installed capacity of low carbon
heat and electricity generation across the
Council's estate
10,720 9,800  11,680 11,000  12,104 11,800  Measured
Annually   12,000
CP_29 Overall carbon emissions (tonnes)
(Non-domestic Council estate) 22,846 35,127  21,791 21,247  20,896 21,000  4,060   19,500
CP_44 Percentage of council dwellings that
are energy efficient 97.6%   97.7%  
Data
Available
February
2024  
Measured
Annually   98.1%
57

Page 58

Our Council Plan Progress Update – Mid Year 2023-24  Page 28 of 33
PI Code and Description 2020/21
Value
2020/21
Target
2020/21
Status
2021/22
Value
2021/22
Target
2021/22
Status
2022/23
Value
2022/23
Target
2022/23
Status
Q2
2023/24
Value
Q2
2023/24
Target
Q2
2023/24
Status
2023/24
Target
CP_45 Length of new or improved active
travel routes per annum (Metres)*       1,090   Measured
Annually   2,000
CP_46 Number of trees planted under the
North Ayrshire 2030 Tree Planting Strategy*       35,627   Measured
Annually   40,000
CP_19 Proportion of operational buildings
that are suitable for their current use (LGBF) 91.05% 93%  91.1% 93%  91.5% 93%  Measured
Annually   92.1%
CP_31 Percentage of total household waste
that is recycled (calendar year as per SEPA)
(LGBF)
52.1% 52.1%  56.3% 53.1%  55.3% 56.9%  61.3% 51%  57%
CP_25 Percentage of Council dwellings that
meet the Scottish Housing Quality Standard
(LGBF)
98.83% 99.5%  49.3% 99.5%  63.2%   Measured
Annually   72.5%
CP_47 Gross rent arrears (all tenants) as at
31 March each year as a percentage of rent
due for the reporting year (LGBF)
5.5%   6.6%   7.1%   Measured
Annually   6.5%
CP_48 Percentage of income due from
Council Tax received by the end of the year
(LGBF)
92.1%   93.3%   94.7%   Measured
Annually   94%
*These indicators have been newly introduced for the Council Plan 2023-28, historical data isn’t currently available for the greyed-out time periods.
**CP_04 Proportion of children meeting developmental milestones (LGBF) – This indicator has been renamed from ‘Percentage of children achieving their developmental
milestones at the time the child starts primary (LGBF)’ to fully align wording with the LGBF.  The measure is unchanged.
** CP_41 Number of empty homes brought back into use (Actual) – Due to a system issue the historical data for this PI has changed slightly.  2020/21 has been amended
from 121 to 122.  2021/22 has been amended from 334 to 335 and 2022/23 has been amended from 123 to 120.  This has been rectified for future reporting.
58

Page 59

Our Council Plan Progress Update – Mid Year 2023-24  Page 29 of 33
Action Tracker
Priority
Ref # Existing Overall Action
2023-24
2023-24
2023-24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28   
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 
CP01 Ensuring that wellbeing is at the heart of local life and
opportunities, with a focus on tackling inequalities. 
CP02 Developing a Community Wealth Building approach to a
wellbeing economy. 
CP03 Improving educational attainment and achievement and closing
the attainment gap. 
CP04 Improving outcomes for care experienced young people
including implementation of The Promise. 
CP05 Developing the Young Workforce and ensuring positive
destinations for school leavers. 
CP06 Providing lifelong learning opportunities for individuals and
organisations, including digital literacy. 
CP07 Maximising access to and uptake of benefits, entitlements and
financial advice. 
CP08
Ensuring that supports are available in communities to alleviate
cost-of-living pressures through community hubs and networks. 
CP09
Through our housebuilding programme and wider Housing
Investment provide homes for life that meet the needs of our
residents. 
59

Page 60

Our Council Plan Progress Update – Mid Year 2023-24  Page 30 of 33
Priority
Ref # Existing Overall Action
2023-24
2023-24
2023-24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28   
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 
CP10
Increase the number of homes in the area through a mix of
private and social developments and bringing empty buildings
back in to use. 
CP11 Exploration of models and the development of pilot schemes to
increase access to and use of public/community transport. 
CP12 Ensure our places and spaces where we live, work and visit are
well maintained and accessible. 
CP13 Developing infrastructure to support business growth. 
CP14 Support KA Leisure’s leadership of North Ayrshire’s Health and
Wellbeing Alliance. 
CP15
Through the Health and Social Care Partnership Strategic Plan
we will protect and provide care and support for those in
need.***                   
CP16
Developing strong relationships with communities and partners
based on trust and shared aspirations using their experiences to
inform service provision. 
CP17
Providing support for community organisations in achieving
their goals, including as Community Wealth Building anchor
organisations. 
CP18
Creating a participation and engagement framework which
ensures opportunities and support for all residents to take part
in influencing local democracy and Council and partner
strategies. 
60

Page 61

Our Council Plan Progress Update – Mid Year 2023-24  Page 31 of 33
Priority
Ref # Existing Overall Action
2023-24
2023-24
2023-24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28   
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 
CP19 Supporting participatory budgeting.                   
CP20 Supporting community asset transfer and community owned
and operated/managed assets. 
CP21 Supporting the Community Planning Partnership and the
Community Plan (LOIP). 
CP22 Developing partnerships with the third and voluntary sector. 
CP23
Placemaking, including creation of locality action plans based
on the Community Plan (LOIP) priorities and support the
delivery of Islands Plans. 
CP24 Ensuring an inclusive, fair, rights-based and asset-based
approach in our work. 
CP25 Accessible public services, both digitally and locally, ensuring a
‘No Wrong Door’ approach. 
CP26 Embedding our net-zero ambition in all democratic decision-
making. 
CP27
Reducing the carbon footprint of our estate through
rationalisation utilising a locality-based approach, and taking a
fabric first and low carbon energy generation approach to
homes and buildings. 
CP28
Improving resilience and reducing carbon by developing and
supporting supply chains where materials and goods are
sourced locally. 
61

Page 62

Our Council Plan Progress Update – Mid Year 2023-24  Page 32 of 33
Priority
Ref # Existing Overall Action
2023-24
2023-24
2023-24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28   
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 
CP29 Promoting new woodland creation and protecting our green
spaces to provide a natural resource for carbon sequestration. 
CP30 Supporting local businesses as they meet their climate change
obligations. 
CP31
Promoting a circular economy in North Ayrshire to reduce
consumption of raw materials and promote reuse, repair and
recycling, and generating energy from residual waste. 
CP32 Developing local Low Carbon energy generation schemes and
networks. 
CP33
Unlocking the potential of community owned energy
generation to bring new income streams into communities and
help them take direct action to combat climate change. 
CP34
Learning for Sustainability, and work with communities to
adopt low carbon behaviour change and encourage climate-
based volunteering activities. 
CP35 Improving communities’ preparedness to deal with the impacts
of climate change already locked-in. 
CP36 Working with communities to adopt low carbon behaviour
change and encourage climate-based volunteering activities. 
CP37 Taking a nature-based approach to protect our habitats and
species. 
CP38 Developing and promoting active travel infrastructure. 
62

Page 63

Our Council Plan Progress Update – Mid Year 2023-24  Page 33 of 33
***Delivery of this ac�on is managed through the Health and Social Care Partnership Strategic Plan.
Priority
Ref # Existing Overall Action
2023-24
2023-24
2023-24
2024/25
2024/25
2024/25
2024/25
2025/26
2025/26
2025/26
2025/26
2026/27
2026/27
2026/27
2026/27
2027/28
2027/28
2027/28
2027/28   
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 
CP39 Transitioning to low and zero carbon travel. 
CP40
Ensuring robust governance arrangements are in place to fulfil
the Council’s statutory duties, manage risk and support delivery
of key priorities.                   
CP41 Using dynamic data and lived experiences to inform decision-
making.                   
CP42 Working with partners nationally, regionally and locally to
secure investment and target resources towards our priorities.                   
CP43
Driving change and transformation, using technology where
appropriate, to deliver efficient and effective services and
support delivery of priorities.                   
CP44 Maximising financial flexibilities to help support delivery of
priorities.                   
CP45 Maximising value from the use of our assets.                   
CP46 Focusing our investment on priorities.                   
CP47 Effective workforce planning ensuring that we have the right
skills/resources to deliver priorities.                   
63

Page 64

Our Council Plan Progress Update – Mid Year 2023-24 
Page 34 of 33 
We strive to make our repor�ng as accessible as possible.  If you have
any ques�ons or require further informa�on on our Council’s
performance please contact:
The Corporate Policy, Performance and Elec�ons Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance 
64

Page 65

1,619 1,492
1,095
H1 2021 H1 2022 H1 2023
NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    2023/2024 Half Yearly Complaint Report 
Purpose:  To inform the Audit and Scrutiny Committee of the Council's
complaint performance and the volumes and trends of complaints
received in the first six months of Financial Year 2023/24. 
Recommendation:  That the Committee notes the report and the information
provided. 
1. Executive Summary 
1.1 This report details complaint handling performance relating to North Ayrshire Council
covering the period 1 April 2023 to 30 September 2023 and is referred to in the report
as H1 2023. 
1.2 To allow comparisons to be made, the report also details some complaint data relating
to previous years’ half yearly reports (H1 2021 and H1 2022). 
1.3 Performance is measured through a number of Scottish Public Services Ombudsman
(SPSO) performance indicators, some of which have national targets. 
2. Background 
2.1 This section contains statistical information and commentary on some of the key
complaint performance indicators.  More information relating to the indicators can be
found in the detailed half yearly report attached at Appendix 1. 
2.2 Volume of complaints received and closed 
2.2.1 A 27% decrease has been noted in complaints received/closed when compared to the
same period last year.
Agenda Item 5
65

Page 66

33%
11%16%
40%
Upheld Partially Upheld Not Upheld Resolved
13%
40%
45%
Upheld Partially Upheld Not Upheld Resolved (2%)
2.3 Complaints closed at each Stage 
H1 2023
Stage One 1012
Stage Two 83 
2.3.1 Whilst there is no national target for the number of complaints to be closed under each
Stage, the Council always seeks to maximise closure at Stage One as complainants
receive a quicker resolution compared to Stage Two, which reduces the impact on
complaint handler time and the possibility of SPSO referrals. 
2.4 Complaint outcomes 
Stage One         Stage Two                                                                   
2.4.1 Up to 31 March 2021, a complaint that meets our complaint criteria could be upheld,
partially upheld or not upheld. From 1 April 2021 a fourth outcome became available to
use called ‘Resolved’. Resolved complaints are where the Council has taken action to
address a problem or issue without making a decision on whether there were any failings
(this would happen where we agree a solution with the complainant at the outset without
needing to actually investigate the complaint). 
2.4.2 Analysis shows the majority of Resolved complaints related to missed bin collections,
where complainants simply wanted their bins collected.   
2.4.3 Many complaints not upheld related to policies, regulations or complaints that were
unfounded. 
2.5 Average time in working days for a full response at each Stage 
Stage One 
4.6 4.2 4.1
0
5
H1 2021 H1 2022 H1 2023
Average days to close National Target (5 days or less)
66

Page 67

84%
16%
Closed on time
Not closed on time
90%
10%
Closed on time
Not closed on time
Stage Two 
2.5.1 The average time in working days for a response under both Stages is better than the
SPSO target response timescales for the last three years. 
2.6 Complaints closed within timescale 
Stage One                                                  Stage Two             
2.6.1 The national target for complaints closed under Stage One is 80% or above. The Council’s
response was better than the national target set.  The national target for complaints closed
under Stage Two is 85% or above and again the Council’s response was better than the
set target. 
2.6.2 Further details of complaints not closed on time are contained in the attached report. 
2.7 Trends identified from upheld/partially upheld complaints 
2.7.1 Key complaint topics for upheld or partially upheld complaints are detailed on pages 9
and 10 of the attached report. 
2.8 Changes or Improvements made as a result of complaints 
2.8.1 Not all Services can implement improvements as a result of complaints due to a number
of factors, including the feasibility of making changes and resource/budget
considerations. That said, improvements were made in some Services as a result of
complaints received during the period and a selection are noted in page 14 of the
attached report. 
2.9  Compliments 
2.9.1 The Council received and recorded over 100 compliments during the period.  Some
praised specific individuals or teams, some related to more than one Service and some
14.4 15.4 16
0
20
H1 2021 H1 2022 H1 2023
Average days to close National  Target (20 days or less)
67

Page 68

were raised by employees complimenting other employees. A selection can be found
in page 15 of the attached report.
3. Proposals 
3.1 It is proposed the Committee approves the report and recognises the Council’s
complaint handling performance for the first six months of Financial Year 2023/2024. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Two Stage Complaint Handling Procedure supports the Council's key priority of
delivering more effective and efficient service provision. It demonstrates commitment
by identifying trends and focussing on service improvements whenever possible for
North Ayrshire residents, customers and visitors. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 None. 
Aileen Craig
Head of Service for Democratic Services 
For further information please contact Darren Miller, Complaint Manager, on (01294)
322988. 
68

Page 69

Background Papers
2023/24 Half Year Complaint Report
69

Page 70

Page | 1 
2023/24 Half Year
Complaint Report
70

Page 71

Page | 2 
Contents 
Page 
Introduction         3 
1 Volume of complaints closed      4 
2  Volume of complaints closed on time  at both Stages   7 
3 Volume of complaints not closed on time per Directorate     7 
4 Key complaint topics       9 
5 Average time in working days for a full response   10 
6  Extended complaints       12 
7 Complaint Outcomes                                                                    13 
8  Improvements made as a result of complaints                        14 
9 Compliments        15 
10 Glossary         16  
71

Page 72

Page | 3 
Introduction 
North Ayrshire Council always seeks to deliver the best services possible to its
customers and residents but it is recognised that dissatisfaction will sometimes occur. 
When it does, we want to know what went wrong, why it went wrong and what we can
do to make things right. 
The Council recognises valuable lessons can be learnt from complaints which are
defined as being expressions of dissatisfaction from members of the public about
actions, or lack of actions, or about the standard of service provided by or on behalf of
the Council.  
The Council’s complaint handling procedure (CHP) has two stages for handling
complaints from members of the public:- 
Stage One complaints (also known as Frontline Resolution) are
straightforward, non-complex complaints the Council can address at the
initial point of contact or as close to the point of service delivery as
possible.  The Council has up to 5 working days to handle these. 
Stage Two complaints (also known as Investigations) are complaints the
Council are typically unable to address at Stage One and require more
time to carry out further investigation.  This may be because the
complaint is complex, serious or high risk.  The Council has up to 20
working days to address these. 
This report details the Council’s complaint handling performance covering the first six
months of financial year 2023 (1 April to 30 September 2023) and is referred to in the
report as H1 2023.  Performance is measured via several Scottish Public Services
Ombudsman indicators (some of which have national targets) and complaint data
relating to previous years has been included in certain sections to allow comparisons
to be made. 
Reporting complaints is a statutory requirement and is monitored by Audit Scotland. 
1
2
72

Page 73

Page | 4 
63
92
54
876
Chief Executive's
Communities & Education
Health & Social Care Partnership
Multi-Service (10)
Place
1   Volume of complaints closed 
1,117 complaints were received during the period and 1,095 closed.  The chart below provides
a breakdown of the closed complaints per Directorate: 
The following tables highlight complaint volumes per Directorate under each Stage: 
Place  Stage One Stage Two
Building Services 136 6
Community Wealth Building - 1
Housing  59 8
Planning 1 2
Property Management & Investment 44 3
Protective Services 9 1
Regeneration - 1
Roads 24 2
Streetscene 68 1
Sustainability 1 2
Waste Services 503 4
Total 845 31 
Multi-Service Stage One Stage Two
Complaints involving more than one service 1 9
Total 1 9 
Health & Social Care Partnership Stage One Stage Two
Children, Families & Criminal Justice 12 2
Health & Community Care 22 6
Mental Health 3 5
Support Services 3 1
Total 40 14
73

Page 74

Page | 5 
1,619 1,492
1,095
H1 2021 H1 2022 H1 2023
Communities & Education Stage One Stage Two
Community Learning & Development 1 -
Education (HQ) 4 3
Education (Schools) 50 19
Facilities Management 9 -
Information & Culture 4 2
Total 68 24 
Chief Executive’s Stage One Stage Two
Chief Executive Office 1 -
Customer Services 49 4
Finance 1 -
IT 1 -
Legal 6 1
Total 58 5 
• Although there is no target for the volume of complaints handled under each Stage,
the Council seeks to maximise closure at Stage One wherever possible and 92% were
handled at this Stage during the period.   
• Some Services handled all their complaints at Stage One. 
• Whilst 46% of all complaints closed related to Waste Services (the majority relating
to missed collections), the Service empty over 102,000 household waste bins each
week.  As this equates to approximately 2.5 million collections during the period,
0.02% of these collections resulted in complaints being raised.  More information
regarding the Waste Services complaints can be found later in this report. 
• Multi-Service complaints have a table of their own as they are not attributed to one
Service. 
Year on Year comparison 
The graph below shows a comparison of the volume of complaints closed over the half year period
in the last three years: 
74

Page 75

Page | 6 
The table below shows the volume breakdown for each Directorate over the last three years: 
Directorate H1 2021 H1 2022 H1 2023 Variance
(2022 – 2023)
Chief Executive’s 172 103 63 -39%
Communities & Education 46 65 92 +41%
HSCP (Social Work complaints) 83 60 54 -10%
Place 1,306 1,259 876 -30%
Total 1,607* 1,487* 1,085* -27%
*Multi-service complaints have been excluded to allow true Directorate comparisons 
• There has been a significant decrease (27%) in complaints received/closed when
comparing H1 2023 with the previous year. 
75

Page 76

Page | 7 
• The national target for closing Stage One complaints on
time is 80% and above. 
• The volume closed on time includes extended
complaints that met their new due dates.  84%
16%
Closed on time
Not closed on time
90%
10%
Closed on time
Not closed on time
2   Volume of complaints closed on time at both Stages 
Stage One       
Stage Two       
3   Volume of complaints not closed on time per Directorate 
This section provides details of complaints not closed on time under each Stage and includes
extended complaints that did not meet their new timescales. 
Stage One                    
Notes
Chief Executive’s 
Communities & Education 
1
1
Legal Services
Finance
5
1
Education (schools)
Education (HQ)
• The national target for closing Stage Two complaints on
time is 85% and above. 
• The volume closed on time includes extended
complaints that met their new due dates. 
One Finance complaint did not meet timescale due to a
communication breakdown because an employee crucial to
the investigation was unavailable. 
The Legal Services complaint that did not meet timescale
was due to workload pressures.
These 6 complaints breached because complainants were
unavailable to assist with investigations and some were
received during the summer break.  Such complaints should
have been escalated to Stage Two and the due dates
extended appropriately.
76

Page 77

Page | 8 
HSCP (Social Work complaints) 
Place 
Waste Services complaints 
The first six months of Financial Year 2023 were challenging due to increased sickness absence
levels in Waste collections, which resulted in operational difficulties. Absence rates during the
summer period were particularly high and the service robustly managed this, resulting in
absence rates improving. 
A manufacturing issue affecting purple bins led to a high number of complaints during the
period.  This is an ongoing contractual issue and while the service have endeavoured to meet
purple bin lid replacement requests, this has unfortunately led to an increase in complaints. 
1
3
1
Mental Health
Health & Comm Care
Children & Families
119
1
16
1
1
2
4
Waste Services
Sustainability
Streetscene
Protective Services
PMI
Housing
Building Services
Complaints in Place that did not meet timescale was due to
a variety of reasons, including complaint handlers,
complainants and 3rd parties being unavailable to assist with
investigations, reduced resources and employee availability. 
Regarding Waste Services complaints that did not meet
timescale, additional information is below.
There were various reasons these complaints did not meet
timescale, including complaint handlers, employees and
complainants not being available to progress or assist with
investigations.
77

Page 78

Page | 9 
Stage Two 
Communities & Education 
HSCP (Social Work complaints) 
Place 
4   Key complaint topics 
Key topics for upheld and partially upheld complaints for Services are listed below.  Services
will not be listed if there were low complaint volumes that did not allow meaningful analysis. 
Chief Executives
Service Key complaint topic(s)
Customer Services • Council tax issues
• Employee actions (alleged or perceived) 
Communities & Education
Service Key complaint topic(s)
Education (HQ and Schools) • Sensitive issues relating to teachers
and/or pupils
• Service delivery/provision
• Employee actions (alleged or perceived) 
HSCP (Social Work complaints) 
Service Key complaint topic(s)
All Services (Children & Families, Health &
Community  Care, Mental Health)
• Service delivery/provision
• Employee actions (alleged or perceived) 
4Education (schools)
1Mental Health
1
2
Planning
Building Services
No reasons were provided as to why these 4 complaints
breached their response due dates. 
Whilst this complaint breached the 20-working day timescale
by a couple of days, no reason was provided as to why it was
not closed within timescale.
The Planning complaint breached timescale due to employee
availability. 
No reasons were provided as to why the 2 Building Services
complaints breached their response due dates. 
78

Page 79

Page | 10 
Place
Service Key complaint topic(s)
Building Services • Follow Up appointments
• Quality of work issues
Housing • Estate Management
PMI • Planned works for tenants
• Gas Central Heating issues
Streetscene • Grass/verge/hedge cutting issues
• Employee actions (alleged or perceived)
Waste Services • Employee actions (alleged or perceived)
• Issues with new bin deliveries
• Missed waste bin collections (all colours)
• Missed assisted bin collections (all
colours)
• Recycle scheme issues (shortage of food
waste bags etc.) 
5   Average time in working days for a full response 
The average time in working days to close complaints under both Stages during the period is
noted below.  Values for previous years have been included to allow comparisons to be made
and any complaints that had their timescales extended have been excluded from the
calculations. 
Stage One 
Stage Two 
4.6 4.2 4.1
0
5
H1 2021 H1 2022 H1 2023
Average days to close National Target (5 days or less)
14.4 15.4 16
0
20
H1 2021 H1 2022 H1 2023
Average days to close National  Target (20 days or less)
79

Page 80

Page | 11 
.
The bar charts below detail Services that did not meet the average time in working days for
a response under either Stage.  Services that met the target are not listed and any complaints
that had their timescales extended have been excluded from the calculations.   
Chief Executive’s 
Stage One 
Finance received and closed one complaint on working day 21.  The complaint
breached due to a communication breakdown because an employee crucial to the
investigation was unavailable. 
Health & Social Care Partnership 
Stage One 
A Mental Health complaint was closed on working day 15 due to the complainant and
an employee relevant to the investigation both being unavailable. 
21
Finance
Average days to close
National Target (5 days)
9.5
Mental Health
Average days to close
National Target (5 days)
80

Page 81

Page | 12 
Place 
Stage Two 
A Planning complaint was closed on working day 47 due to a key employee
instrumental in the complaint not being available. 
6   Extended complaints 
• 39 complaints had their timescales extended during the period (28 at Stage One and
11 at Stage Two).  The complaints related to multiple services across all Directorates. 
• There were numerous reasons for extending, including complainants and employees
being unavailable to assist with investigations and additional information having to
be sought to support investigation decisions. 
• Of the 39 complaints that had their timescales extended, 77% were closed within
their new timescales. 
26.5
Planning
Average days to close
National Target (5 days)
81

Page 82

Page | 13 
33%
11%16%
40%
Upheld Partially Upheld Not Upheld Resolved
13%
40%
45%
Upheld Partially Upheld Not Upheld Resolved (2%)
7   Complaint Outcomes 
Up until 31 March 2021, a complaint that meets our complaint criteria could be upheld,
partially upheld or not upheld. From 1 April 2021, a fourth outcome became available to use
called ‘Resolved’. Resolved complaints are where the Council has taken action to address the
problem/issue without making a decision on whether there were any failings (this would
happen where we agree a solution with a complainant at the outset without needing to
actually investigate the complaint). 
The charts below detail the number of complaints upheld, partially upheld, not upheld or
resolved under both Stages. 
Stage One 
Stage Two 
*Partially Upheld complaints are complaints that contain more than one complaint element and at least one of them is upheld
• Complaints that were upheld or partially upheld* related
to numerous services across all Directorates. 
• Complaints that were not upheld related to policies,
regulations or complaints that were poor
quality/unfounded. 
• Of all complaints upheld and partially upheld* at Stage
One, just over half related to Waste Services and in
particular waste bin collections.   
• Complaints closed as Resolved related to multiple
services across all Directorates, with over half relating to
Waste Services (again mainly missed waste bin
collections).  This indicates those complainants simply
wanted their bins collected without the need for any
investigation. 
• Complaints that were not upheld related to policies,
regulations or complaints that were poor quality or
unfounded.
82

Page 83

Page | 14 
8   Improvements made as a result of complaints 
Some improvements were made as a result of complaints received during the period and a
small selection is noted below. 
What happened? What we did
A trader encountered problems when
completing and return a paper application to
obtain a licence, including the incorrect fee
being paid as the fees listed on the Council’s
website were out of date.
An apology was offered for the inconvenience
caused, the application processed and licence
granted.  The Council is investigating placing the
application form online to help speed up the
process and the appropriate webpage has been
updated with the correct fees. 
A visitor to a Recycle Centre encountered
problems in terms of parking at the site due
to excessive public use of the site that day.
An apology was offered to the visitor for the
problems encountered.  The site has been
upgraded to accommodate a larger volume of
people wanting to recycle and a daily update was
placed on the internet regarding footfall at the
site to reduce disruption. 
A tenant encountered problems when
radiators were incorrectly fitted and
applying for a disturbance allowance
payment for the inconvenience.  
An apology was offered and the matters
addressed.  Discussions then took place between
the Council and the contractor regarding the
importance of replacing fixtures like for like as
far as is practical and to rectify errors in a
timeous manner. The processing of disturbance
allowance payments are also being monitored
more closely to minimise inconvenience to
tenants. 
A resident changed their bank details and
experienced problems trying to change
their Council Tax Direct Debit details to the
new account.
An apology was offered to the complainant and
the Direct Debt set up.  The complainant asked if
there could be an online option to amend the
bank details for Council Tax rather than just an
option to set up a new one each time.  The
service is currently considering this feedback. 
A complaint was received about grass
cutting where litter was not being removed
prior to cutting, which resulted in the litter
being shredded and distributed across the
park.
A refresher with the team responsible was
arranged to ensure they are aware of their
obligations in terms of litter removal and every
effort will be made in the future to ensure litter
is removed prior to any grass cutting activities. 
83

Page 84

Page | 15 
A resident was very happy with the
service provided by Roads in relation to
addressing a lighting fault
9   Compliments 
Over 100 compliments were recorded cross-Council during the period and whilst they cannot
all be highlighted in this report, a selection is noted below. 
“My family and I like (are fond of?) everything
your  Refugee Team does for us Ukrainians. Just
want to say big thank you for everything.
Incredible attitude towards us and everything is
easy and simple”
“Thank you to Waste Services for following up
on a complaint I made about my waste bins
being missed.  They have not been missed
since so thank you!” 
“I’ve had an issue regarding arranging a special
uplift and made a number of calls to your Contact
Centre. Every time I called your operators were
very helpful and considerate.  They’ve to be
commended because every time they answer a
call they don’t know what that call is going to be
about and have to rely on their considerable
knowledge to try and answer or resolve it” 
“To the staff at Bartonholm Recycling Centre,
every time I go there I see them out helping folk
get their discarded stuff away safely. And it’s
always done with a smile. It must be a tough job
in all weathers but they’re still so cheery and
polite! Good on you, guys.  You could deliver
lessons in customer care!”
“I just wanted to let you know how impressed
I am with the Recovery Development Worker.
Yesterday was the first time I spoke with him
and I was really struck by his high level of
motivation, honesty and very obviously
genuine desire to help and support people.  He
is like a breath of fresh air.  We don’t give
positive feedback often enough so wanted to
let you know”
Exceptional feedback received for the Universal
Early Years service which has resulted in an
employee being invited to present at a European
Conference on infant feeding.
“I recently made a complaint to your Property
Management department about some issues with
scaffolding. Just wanted to say it got fixed immediately
and you even fixed up the gate. Thank you to whoever
came out to fix it. Absolute brilliant job”
“I just want to highlight how fantastic the
team at Ardrossan Library are. They go
out of their way to show a welcoming,
friendly environment. The time and effort
they put in with kids (and adults alike) at
the Monday toddler club is just brilliant.
The kids look forward to it all week long”
A number of people have complimented the
Licensing Team regarding their help and support
regarding a short term let process for a number
of hosts
“I recently wrote to you regarding the little garden
area outside Largs station.  I was absolutely delighted
to see that the area has been cleared of weeds and
litter and bedding plants have been planted.  It all
looks really pretty so thank you to Streetscene who
carried out the planting  What a difference it makes”
84

Page 85

Page | 16 
10   Glossary 
Term     Explanation 
Stage One Stage One (aka Frontline Resolution) aims to resolve straightforward
customer complaints that require little or no investigation.  Any
employee may deal with complaints at this stage and they can be
resolved via any channel.  The main principle is to seek resolution at the
earliest opportunity and as close to the point of service delivery as
possible.  Stage One complaints must be responded to within 5 working
days unless an extension (a maximum of 5 additional working days or 10
if the complaint relates to Social Work) is requested and approved by a
senior manager.  The Council should, however, always aim to resolve
these types of complaints within 5 working days. 
Stage Two Not all complaints are suitable for Frontline Resolution and not all
complaints will be satisfactorily resolved at that stage.  Complaints
therefore handled at Stage Two (aka Investigation) typically require a
detailed examination before the Council can state its position.  These
complaints may already have been considered at Stage One, or they
may have been identified from the outset as being complex, serious or
high risk and needing immediate investigation.  The investigation under
a Stage Two should establish all the facts relevant to the points made in
the complaint and give the customer a full, objective and proportionate
response that represents our final position.  Stage Two complaints must
be responded to within 20 working days unless an extension is approved
by senior manager in conjunction with the customer.  Stage Two
complaints require a written response, signed by a senior manager. 
Complaint criteria 
When an expression of dissatisfaction is received the Council determines if the issue falls into one
of six complaint categories: 
• A service the Council should be providing is not being provided (or is not available)
• A request for a service was provided but not to an appropriate standard 
• A request for service has not been answered or actioned within the agreed timescale
• A Council employee was rude, unhelpful or unprofessional
• A Council employee did not attend an appointment or call-out on a date/time agreed
• The complaint relates to a policy (internal or external) 
If the issue being raised relates to one or more of the above, the matter is considered a complaint
and will be recorded and handled as such.  If not, the matter will be considered something else
and actioned accordingly. 
END OF REPORT
85

Page 86

86

Page 87

NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    External Audit Plan 2023/24 
Purpose:  To inform the Committee of the External Audit Plan for 2023/24. 
Recommendation:  That Committee notes the External Audit Plan for 2023/24. 
1. Executive Summary 
1.1 Audit Scotland are the Council’s external auditors for the period 2022/23 to 2027/28,
with 2023/243 being the second year of this appointment. 
1.2  This report provides the Audit and Scrutiny Committee with details of Audit Scotland’s
Annual Audit Plan for the 2023/24 audit. 
1.3  Following completion of the audit, Audit Scotland will present their annual audit report
to the Audit and Scrutiny Committee during Autumn 2024. 
2. Background 
2.1 Audit Scotland have been appointed as the Council’s external auditors for the period
2022/23 to 2027/28 with 2023/24 being the second year of this appointment. In addition,
Audit Scotland are the appointed auditors for the North Ayrshire Integration Joint Board
for the same period. 
2.2  Audit Scotland’s Annual Audit Plan for the 2023/24 audit is attached at Appendix 1. A
representative of Audit Scotland will be in attendance to present the plan to the
Committee. 
2.3  In planning the audit work, Audit Scotland have identified a number of key risks and
these will form the basis of their audit plans for the year. 
2.4 The Code of Audit Practice sets out four audit dimensions which set a common
framework for all public sector audits in Scotland. Audit Scotland will consider the
adequacy of the arrangements in place in relation to each of these, including: 
• Financial Management – consideration of the arrangements to secure sound
financial management; 
• Financial Sustainability – consideration of the appropriateness of the use of the
going concern basis;
Agenda Item 6
87

Page 88

• Vision, Leadership and Governance – review of the arrangements in place to deliver
the vision, strategy and priorities adopted by the Council; and 
• Use of Resources to Improve Outcomes – consideration of how the Council
demonstrates economy, efficiency and effectiveness. 
2.5  Other responsibilities will include: 
• Financial Sustainability – identified as an area of audit focus due to the challenging
financial environment in which the council is operating; and 
• Best Value – assessment over the period of the audit appointment. 
3. Proposals 
3.1 That Committee notes the External Audit Plan for 2023/24. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The fee which will be charged by Audit Scotland for the 2023/24 audit work will be
£377,760. This represents an increase of £21,370 (6.0%) against the 2022/23 fee. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities and focussing our investment on
priorities. 
Community Wealth Building 
4.7 None.
88

Page 89

5. Consultation 
5.1 Audit Scotland consulted with the Head of Service (Finance) in preparing their audit
plan. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
None
89

Page 90

Prepared for North Ayrshire Council  
March 2024
North Ayrshire
Council
Annual Audit Plan 2023/24 
90

Page 91

North Ayrshire Council Annual Audit Plan 2023/24 | 2
Contents 
Introduction 3
Annual Accounts audit planning 5
Wider Scope and Best Value Audit 13
Reporting arrangements, timetable, and audit fee 15
Other matters 18 
91

Page 92

Introduction | 3 
Introduction 
Audit Appointment
1.  Fiona Mitchell-Knight, Audit Scotland, has been appointed by the Accounts
Commission as external auditor of North Ayrshire Council for the period from
2022/23 until 2026/27. The 2023/24 financial year is therefore the second year of
the five-year audit appointment. 
Summary of planned audit work
2.  This document summarises the work plan for our 2023/24 external audit of
North Ayrshire Council (the council). The main elements of our work include:
• evaluation of the design and implementation of the key controls within the
main accounting systems
• an audit of the annual accounts, and provision of an independent
auditor’s report  
• an audit opinion on other statutory information published within the
annual accounts including the management commentary, the
governance statement, and the remuneration report 
• consideration of arrangements in relation to wider scope areas: financial
management; financial sustainability; vision, leadership, and governance;
and use of resources to improve outcomes 
• consideration of Best Value arrangements
• providing assurance on the Housing Benefit Subsidy Claim, Non-
Domestic Rates Return and the Whole of Government Accounts (WGA)
return
• review the council’s arrangements for preparing and publishing statutory
performance information.
Respective responsibilities of the auditor and the council 
3.  The Code of Audit Practice 2021 sets out in detail the respective responsibilities
of the auditor and the council. Key responsibilities are summarised below. 
Auditor responsibilities
4.  Our responsibilities as independent auditors are established by the Local
Government (Scotland) Act 1973 and the Code of Audit Practice (including
supplementary guidance) and guided by the Financial Reporting Council’s Ethical
Standard. 
92

Page 93

Introduction | 4 
5.  Auditors in the public sector give an independent opinion on the financial
statements and other information within the annual accounts. We also review and
report on the arrangements within the council to manage its performance and use
of resources. In doing this, we aim to support improvement and accountability.
The council’s responsibilities
6.  The council is responsible for maintaining accounting records and preparing
annual accounts that give a true and fair view. They are also required to produce
other reports in the annual accounts in accordance with statutory requirements.
7.  The council has the primary responsibility for ensuring the proper financial
stewardship of public funds, compliance with relevant legislation and establishing
effective arrangements for governance, propriety and regularity that enables it to
successfully deliver its objectives. 
Communication of fraud or suspected fraud
8.  In line with ISA (UK) 240 (The Auditor's Responsibilities Relating to Fraud in
an Audit of Financial Statements), in presenting this plan to the Audit and
Scrutiny Committee we seek confirmation from those charged with governance of
any instances of actual, suspected, or alleged fraud that should be brought to our
attention. During our audit, should members of the council have any such
knowledge or concerns relating to the risk of fraud within it, we invite them to
communicate this to us for our consideration.
Adding value
9.  We aim to add value to the council through our external audit work by being
constructive and forward looking, by identifying areas for improvement and by
recommending and encouraging good practice. In so doing, we will help the
council promote improved standards of governance, better management and
decision making and more effective use of resources. Additionally, we attend
meetings of the Audit and Scrutiny Committee and actively participate in
discussions. 
93

Page 94

Annual Accounts audit planning | 5 
Annual Accounts audit
planning 
Introduction
10.  The annual accounts are an essential part of demonstrating the council’s
stewardship of resources and its performance in the use of those resources.
11.  As appointed auditors we are required to perform an audit of the financial
statements, consider other information within the Annual Accounts, and express a
number of audit opinions in an Independent Auditor's Report in accordance with
International Standards on Auditing (ISAs) in the UK, Practice Note 10 from the
Public Audit Forum which interprets the ISAs for the public sector, and guidance
from Audit Scotland.
12.  We focus our work on the areas of highest risk. As part of our planning
process we prepare a risk assessment highlighting the audit risks relating to each
of the main financial systems relevant to the production of the financial
statements in the annual accounts. 
Materiality
13.  Materiality is an expression of the relative significance of a matter in the
context of the annual accounts. The concept of materiality is applied by auditors
in planning and performing the audit, and in evaluating the effect of any
uncorrected misstatements on the financial statements. We are required to plan
our audit to determine with reasonable confidence whether the annual accounts
are free from material misstatement. The assessment of what is material is a
matter of professional judgement over both the amount and the nature of the
misstatement. 
Materiality levels for the 2023/24 audit of the council and its group
14.  The materiality levels for the council and its group are set out in Exhibit 1. 
Exhibit 1
2023/24 materiality levels for the council and its group
Materiality Council Group
Planning materiality: This is the figure we calculate to assess the
overall impact of audit adjustments on the financial statements.
Materiality has been set based on our assessment of the needs of the
users of the financial statements and the nature of the council’s
£16.2
million
£19.8
million
94

Page 95

Annual Accounts audit planning | 6 
operations. It has been set at 2% of gross expenditure based on the
audited annual accounts for 2022/23. 
Performance materiality: This acts as a trigger point. If the aggregate
of errors identified during the annual accounts audit exceeds
performance materiality, this would indicate that further audit procedures
should be considered. Using our professional judgement, we have
assessed performance materiality at 70% of planning materiality.
£11.3
million 
£13.9
million
Reporting threshold: We are required to report to those charged with
governance on all unadjusted misstatements more than the ‘reporting
threshold' amount. We assessed the reporting threshold at 5% of
planning materiality, “capped” at £0.5 million using our professional
judgement.
£0.5
million 
£0.5
million 
Source: Audit Scotland
Significant risks of material misstatement to the annual
accounts
15.  Our risk assessment draws on our knowledge of the council, its major
transaction streams, key systems of internal control and risk management
processes. It is informed by our discussions with management and internal audit,
attendance at committees and a review of supporting information. 
16.  Audit risk assessment is an iterative and dynamic process. Our assessment of
risks set out in this plan may change as more information and evidence becomes
available during the progress of the audit. Where such changes occur, we will
advise management and where relevant, report them to those charged with
governance.
17.  Based on our risk assessment process, we identified the following significant
risks of material misstatement to the annual accounts. These risks have the
greatest impact on our planned audit procedures. Exhibit 2 summarises the nature
of the risks, the sources of assurance from management arrangements and the
further audit procedures we plan to perform to gain assurance over the risk. 
95

Page 96

Annual Accounts audit planning | 7 
Exhibit 2 
2022/23 significant risks of material misstatement to the annual accounts 
Significant risk of
material misstatement 
Sources of
management
assurance  
Planned audit response
1. Risk of material
misstatement due to
fraud caused by
management override of
controls 
As stated in ISA (UK) 240
(The Auditor's
Responsibilities Relating to
Fraud in an Audit of
Financial Statements),
management is in a unique
position to perpetrate fraud
because of their ability to
override controls that
otherwise appear to be
operating effectively. 
• Owing to the
nature of this
risk, assurances
from
management are
not applicable in
this instance.
• Assess the adequacy of controls in
place for identifying and disclosing
related party relationships and
transactions in the financial statements. 
• Assess the design and implementation
of controls over journal entry
processing.
• Make inquiries of individuals involved in
the financial reporting process about
inappropriate or unusual activity
relating to the processing of journal
entries and other adjustments.
• Test journals at the year-end and post-
closing entries and focus on significant
risk areas. 
• Evaluate significant transactions
outside the normal course of business.
• We will assess any changes to the
methods and underlying assumptions
used to prepare accounting estimates
compared to the prior year.
• Substantive testing of income and
expenditure transactions around the
year-end to confirm they are accounted
for in the correct financial year.
• Focussed testing of accounting
accruals and prepayments.
2. Significant estimation
and judgment: other land
and buildings, council
dwellings and schools
PPP valuations
The council held other land
and buildings, including its
council dwellings and
schools PPP estate, with a
• Revaluations
completed by
Royal Institute of
Chartered
Surveyors
(RICS) qualified
surveyors.
• Revaluations
carried out for all
• Review the information provided to the
valuer to assess for completeness.
• Evaluate the competence, capabilities,
and objectivity of the professional
valuer.
• Obtain an understanding of
management’s involvement in the
96

Page 97

Annual Accounts audit planning | 8 
Significant risk of
material misstatement 
Sources of
management
assurance  
Planned audit response
net book value of £1,042
million as at 31 March
2023. 
There is a significant
degree of subjectivity in
the valuation of land and
buildings. Valuations are
based on specialist and
management assumptions
and changes in these can
result in material changes
to valuations.
The assets are revalued
on a five-year rolling basis.
Values may also change
year on year, and it is
important that the council
ensures the financial
statements accurately
reflect the value of the
assets.
Risk: Valuations of these
assets are materially
misstated.
assets as part of
rolling
revaluation
programme.
• Detailed working
papers retained
to support asset
reviews and
impairments.
• An annual
impairment
review is
undertaken by
the registered
valuer and
reviewed by
management.
• Documentation
of the s95
officer’s
consideration of
the processes in
place to confirm
that the year-end
valuations are
free form
material
misstatement.
valuation process to assess if
appropriate oversight has occurred.
• Test the reconciliation between the
financial ledger and the asset register.
• Evaluate management’s assessment of
why it considers that the land and
buildings not revalued in 2023/24 are
not materially misstated. We will
critically assess the appropriateness of
any assumptions.
• Critically assess the adequacy of the
council’s disclosures regarding the
assumptions in relation to the valuation
of other land and buildings and council
dwellings.
Source: Audit Scotland
Other area of audit focus 
18.  As part of our assessment of audit risks, we have identified two other areas
where we consider there is also a risk of material misstatement to the financial
statements. Based on our assessment of the likelihood and magnitude of the
risks, we do not consider these to represent significant risks. We will keep these
areas under review as our audit progresses. 
19.  Other areas of specific audit focus are:
• Pension balance: This is an area of audit focus due to the material value and
significant assumptions used in the calculation of the asset or liability balance.
We will utilise the work of PwC as auditor expert in assessing the
reasonableness of the methodologies used and assumptions made by the
97

Page 98

Annual Accounts audit planning | 9 
Council’s actuary, Hymans Robertson LLP, in arriving at the IAS 19 pension
valuation as at 31 March 2024.
• Group consolidation adjustments: This is an area of audit focus due to
issues identified in our testing of group consolidation adjustments in the
2022/23 accounts.  We will carry out focussed substantive testing of group
transactions and consolidation adjustments, including assessing the
completeness of adjustments for intra-group balances.
Consideration of the risks of fraud in the recognition of revenue
and expenditure
20.  As set out in ISA (UK) 240 (The Auditor's Responsibilities Relating to Fraud
in an Audit of Financial Statements), there is a presumed risk of fraud over the
recognition of revenue. There is a risk that revenue income may be misstated
resulting in a material misstatement in the financial statements. We have rebutted
this presumed risk in 2023/24 as, while the possibility of fraud exists, we do not
judge it to be a significant risk due to the nature of the majority of the council’s
income streams, namely government funding and grants. 
21.  In line with Practice Note 10 (Audit of financial statements and regularity of
public sector bodies in the United Kingdom), as most public-sector bodies are net
spending bodies, the risk of material misstatement due to fraud related to
expenditure recognition may in some cases be greater than the risk relating to
revenue recognition. We have considered each of the council’s expenditure
streams, and based on our knowledge of the council, prior year considerations
and our risk assessment to date, we do not consider these to be susceptible to
material misstatement due to fraud. We also consider there to be limited
incentive and opportunity for the manipulation of expenditure recognition in the
financial statements. We have therefore rebutted the risk of material
misstatement due to fraud in expenditure recognition for 2023/24.
22.  We have not, therefore, incorporated specific work into our audit plan in
these areas over and above our standard audit procedures. 
Audit of the management commentary, annual governance
statement and remuneration report
23.  In addition to the appointed auditor’s opinion of the financial statements, the
Accounts Commission prescribes that the appointed auditor should provide
opinions as to whether the management commentary, annual governance
statement, and the audited part of the remuneration report, have been compiled
in accordance with the appropriate regulations and frameworks and are
consistent with the financial statements.
24.  To inform these opinions we will consider whether the disclosures within each
statement comply with the requirements of the applicable guidance, and confirm
that relevant information reflects the contents of the financial statements and
other supporting documentation, including:
• Management commentary: Consideration of performance information
reported to council committees and published during the year.
98

Page 99

Annual Accounts audit planning | 10 
• Annual governance statement: Reviewing the Local Code of Corporate
Governance, considering the annual assurance statements completed, and
prepared by Senior Officers to provide assurances to the Chief Executive, and
Internal Audit’s annual assurance statement.
• Remuneration report: Obtaining and reviewing payroll data and HR reports. 
25.  Based on our knowledge of the audit, and the established procedures in
place to produce these statements, we have not identified any specific risks to be
communicated to those charged with governance in relation to the audit of the
management commentary, annual governance statement, and audited part of the
remuneration report.
Group Consideration 
26.  As group auditors, we are required under ISA (UK) 600 (Audits of group
financial statements (including the work of component auditors)) to obtain
sufficient appropriate audit evidence on which to base our audit opinion on the
group accounts.
27.  The council has a group which comprises component entities including
subsidiaries, associates, and joint ventures. The audits of the financial
information of some of the components are performed by other auditors. We plan
to place reliance on the work of the component auditors. We will obtain sufficient
appropriate audit evidence in relation to the consolidation process and the
financial information of the components on which to base our group audit opinion.
28.  At this stage, it has been assessed that there are no other significant group
components, other than the council and Integration Joint Board (IJB). All non-
significant group components will be covered by an analytical review at the group
level. 
29.  We will obtain sufficient appropriate audit evidence in relation to the
consolidation process and the financial information of the components on which
to base our group audit opinion.
Audit of the trusts registered as Scottish charities 
30.  The 2006 Regulations require charities to prepare annual accounts and
require an accompanying auditor’s report where any legislation requires an audit.
The Local Government (Scotland) Act 1973 specifies the audit requirements for
any trust fund where some or all members of a council are the sole trustees.
Therefore, a full and separate audit and independent auditor’s report is required
for each registered charity where members of the council are sole trustees,
irrespective of the size of the charity.
31.  North Ayrshire Council administers eight such registered charities, disclosed
in a single set of annual accounts, with total assets of some £0.662 million. This
is in accordance with the connected charities rules. The preparation and audit of
annual accounts of registered charities is regulated by the Charities and Trustee
Investment (Scotland) Act 2005 and the Charities Accounts (Scotland)
Regulations 2006.
99

Page 100

Annual Accounts audit planning | 11 
32.  Other than a risk of management override of controls which has also been
identified as risks in respect of the council’s annual accounts, no specific
planning risks were identified in respect of the charity’s annual accounts. 
Materiality levels for the 2022/23 audit of trusts registered as Scottish charities
33.  Materiality levels for the various trusts are set out in exhibit 3.
Exhibit 3
2022/23 materiality levels for trusts registered as Scottish charities
Charitable trust Planning
Materiality
Performance
Materiality
Reporting
Threshold
Anderson Park Trust
(SC042136)
£1
(Based on 2% of
audited 2022/23 net
asset value; £1
minimum)
£1
(Based on 75% of
planning materiality;
£1 minimum)
£1
(Based on 5% of
overall materiality;
£1 minimum)
Douglas Sellers Trust
(SC042101)
£6
(Based on 2% of
audited 2022/23 net
asset value)
£5
(Based on 75% of
planning materiality)
£1 
(Based on 5% of
overall materiality;
£1 minimum)
Margaret Archibald
Bequest (SC042117)
£5,622
(Based on 2% of
audited 2022/23 net
asset value)
£4,216
(Based on 75% of
planning materiality)
£281
(Based on 5% of
overall materiality)
North Ayrshire Council
Charitable Trust
(SC025083)
£6,697
(Based on 2% of
audited 2022/23 net
asset value)
£5,023
(Based on 75% of
planning materiality)
£335
(Based on 5% of
overall materiality)
North Ayrshire Council
(Dalry) Charitable Trust
(SC043644)
£38
(Based on 2% of
audited 2022/23 net
asset value)
£29
(Based on 75% of
planning materiality)
£2
(Based on 5% of
overall materiality)
North Ayrshire Council
(Kilbirnie &
Glengarnock) Charitable
Trust (SC043600)
£60 
(Based on 2% of
audited 2022/23 net
asset value)
£45 
(Based on 75% of
planning materiality)
£3
(Based on 5% of
overall materiality)
100

Page 101

Annual Accounts audit planning | 12 
North Ayrshire Council
(Kilwinning) Charitable
Trust (SC043374)
£752
(Based on 2% of
audited 2022/23 net
asset value)
£564
(Based on 75% of
planning materiality)
£38
(Based on 5% of
overall materiality)
North Ayrshire Council
(Largs) Charitable Trust
(SC043494)
£67
(Based on 2% of
audited 2022/23 net
asset value)
£50
(Based on 75% of
planning materiality)
£3
(Based on 5% of
overall materiality)
Source: Audit Scotland
101

Page 102

Wider Scope and Best Value Audit | 13 
Wider Scope and Best Value Audit 
Introduction
34.  The Code of Audit Practice sets out the four areas that frame the wider scope
of public sector audit. The Code of Audit Practice requires auditors to consider
the adequacy of the arrangements in place for the wider scope areas in audited
bodies.
35.  In summary, the four wider scope areas cover the following:  
• Financial management: means having sound budgetary processes. We
will consider the arrangements to secure sound financial management
including the strength of the financial management culture,
accountability, and arrangements to prevent and detect fraud, error, and
other irregularities. This will include reviewing the council’s progress with
investigating the matches identified by the National Fraud Initiative
exercise.
• Financial sustainability: as auditors, we consider the appropriateness
of the use of the going concern basis of accounting as part of the annual
audit. We will also comment on financial sustainability in the longer term.
We define this as medium-term (two to five years) and longer-term
(longer than five years). 
• Vision, leadership, and governance: we conclude on the arrangements
in place to deliver the vision, strategy and priorities adopted by the
council. We also consider the effectiveness of the governance
arrangements to support delivery.
• Use of resources to improve outcomes: we will consider how the
council demonstrates economy, efficiency, and effectiveness through the
use of financial and other resources.  
Significant wider scope risks 
36.  Our planned work on the wider scope areas is risk based and proportionate.
Our risk assessment has not identified any significant risks in respect of the
above wider scope areas. 
Financial sustainability 
37.  Whilst not a significant audit risk, the challenging financial environment in
which the council, along with other public sector bodies, is operating in, financial
sustainability has been identified as an area of audit focus. There are challenges
to the medium and longer-term financial sustainability due to the uncertainty over
future Scottish Government funding allocations, the rising cost of inflation and the
cost of implementing future pay settlements. Our annual audit report will include
102

Page 103

Wider Scope and Best Value Audit | 14 
comment on the council’s 2023/24 financial outturn, 2024/25 budget, medium-
term financial plan and monitoring and reporting of financial resilience indicators.
Best Value 
38.  Under the 2021 Code of Audit Practice, the audit of Best Value in councils is
fully integrated within our annual audit work. Auditors are required to evaluate
and report on the performance of councils in meeting their Best Value duties.
39.  The arrangements to secure Best Value at North Ayrshire Council will be
assessed over the period of the audit appointment and will include an annual
evaluation of risks and improvement areas and public performance reporting. We
will also follow up findings reported previously on Best Value, including last year’s
work on leadership, to assess the pace and depth of improvement. This work will
be integrated with the wider scope audit areas discussed above.
40.  As part of our annual work on Best Value, we conduct thematic reviews as
directed by the Accounts Commission. In 2023/24, the thematic review across the
sector will be on workforce innovation and will consider how councils are
responding to the current workforce challenge through building capacity,
increasing productivity, and innovation. Our conclusions and judgements will be
reported in a separate report to management and summarised in our Annual
Audit Report.
41.  At least once every five years, the Controller of Audit will report to the
Accounts Commission on the council’s performance in meeting its Best Value
duties. The second year of the programme is from October 2023 to August 2024.
North Ayrshire Council is not included in the second year of the programme. 
103

Page 104

Reporting arrangements, timetable, and audit fee | 15 
Reporting arrangements,
timetable, and audit fee 
Reporting arrangements 
42.  Audit reporting is the visible output for the annual audit. All annual audit plans
and the outputs, as detailed in exhibit 4, and any other outputs on matters of public
interest will be published on our website: www.audit-scotland.gov.uk. 
43.  Matters arising from our audit will be reported on a timely basis and will include
agreed action plans. Draft reports will be issued to the relevant officers to confirm
factual accuracy. 
44.  We will provide an independent auditor’s report to North Ayrshire Council (the
council) and the Accounts Commission setting out our opinions on the annual
accounts. We will provide the council and Accounts Commission with an annual
report on the audit containing observations and recommendations on significant
matters which have arisen during the audit. 
45.  Exhibit 5 outlines the target dates for our audit outputs. 
Exhibit 5
2023/24 Audit outputs
Audit Output Latest date
Annual Audit Plan 31 March 2023
Best Value Thematic Report 30 September 2023
Independent Auditor's Report 30 September 2023
Annual Audit Report 30 September 2023
Source: Audit Scotland
Timetable
46.  To support an efficient audit, it is critical that the timetable for producing the
annual accounts for audit is achieved. We have included a proposed timetable for
the audit at Exhibit 6 that has been discussed and agreed with management. 
104

Page 105

Reporting arrangements, timetable, and audit fee | 16 
47.  We recognise that it is in the best interests of public accountability to get the
reporting of audited annual accounts back to pre-pandemic timelines. We are
identifying ways to work more efficiently to expedite the 2023/24 audits whilst at
the same time maintaining high standards of quality. In 2023/24 we may not meet
the target of concluding the audit and signing the accounts by 30 September, but
we hope to be as close to this as possible. We are currently planning for an
October completion.
48.  We intend to take a hybrid approach to the 2023/24 audit with a blend of
onsite and remote working. We will continue to work closely with management to
identify the most efficient approach and will keep timeframes for the completion
of the audit under review. Progress will be discussed with management over the
course of the audit. 
Exhibit 6
Proposed annual accounts timetable  
Key stage    Provisional Date
Consideration of the unaudited annual accounts by those charged
with governance (Audit and Scrutiny Committee)
30 June 2023
Latest submission date for the receipt of the unaudited accounts with
complete working papers package.
30 June 2023
Latest date for final clearance meeting with the Head of Service
(Finance), agreement of the audited and unsigned annual accounts
and the proposed annual audit report.
To be confirmed
Issue of proposed annual audit report, letter of management
representation and proposed independent auditor’s report to those
charged with governance. 
To be confirmed
Presentation of proposed annual audit report to those charged with
governance.
Approval of the North Ayrshire Council annual accounts by those
charged with governance, independent auditor’s report signed
electronically following this approval and the final annual audit report
issued. 
To be confirmed
Certified Non-Domestic Rates Return, Housing Benefit subsidy claim
and WGA assurance. 
To be confirmed
Source: Audit Scotland 
105

Page 106

Reporting arrangements, timetable, and audit fee | 17 
Audit fee  
49.  In setting the fee for 2023/24 we have assumed that the council has effective
governance arrangements and will prepare comprehensive and accurate annual
accounts for audit in line with the agreed timetable for the audit. The audit fee
assumes there will be no major change in respect of the scope of the audit during
the year and where our audit cannot proceed as planned, a supplementary fee
may be levied. The audit fee for 2023/24 is £377,760 (£356,390 in 2022/23).
There is a separate audit fee of £1,100 for the audit of the registered charities
administered by the council (£1,100 in 2022/23).
106

Page 107

Other matters | 18 
Other matters 
Internal audit
50.  It is the responsibility of the council to establish adequate internal audit
arrangements. The council’s internal audit function is provided by its internal
audit section led by the Senior Manager (Audit, Fraud, Safety & Risk). 
51.  While we are not planning to place formal reliance on the work of internal
audit in 2023/24, we will review internal audit reports and assess the impact of
the findings on our annual accounts and wider scope audit responsibilities. 
Independence and objectivity
52.  Auditors appointed by the Accounts Commission must comply with the Code
of Audit Practice and relevant supporting guidance. When auditing the annual
accounts, auditors must also comply with professional standards issued by the
Financial Reporting Council and those of the professional accountancy bodies.
These standards impose stringent rules to ensure the independence and
objectivity of auditors. 
53.  Audit Scotland has robust arrangements in place to ensure compliance with
these standards including an annual ‘fit and proper’ declaration for all members
of staff. The arrangements are overseen by the Executive Director of Innovation
and Quality, who serves as Audit Scotland’s Ethics Partner.
54.  The appointed auditor for North Ayrshire Council is Fiona Mitchell-Knight,
Audit Director.  David Jamieson, Senior Audit Manager is the appointed auditor of
the registered charities administered by the council. Auditing and ethical
standards require the appointed auditor to communicate any relationships that
may affect the independence and objectivity of audit staff. We are not aware of
any such relationships pertaining to the audit of the council or charitable trusts.
Audit Quality 
55.  Quality is at the core of public audit in Scotland and is the foundation for
building consistency and confidence across all audit work. High quality audits
provide assurance, add value, and can support public bodies to achieve their
objectives.
56.  Audit Scotland are committed to delivering high quality audits. The
foundation of our quality framework is our Audit Guide, which incorporates the
application of professional auditing, quality and ethical standards and the Code of
Audit Practice (and supplementary guidance) issued by Audit Scotland and
approved by the Auditor General for Scotland. To ensure that we achieve the
required quality standards, Audit Scotland conducts peer reviews and internal
quality reviews. Additionally, the Institute of Chartered Accountants of England
107

Page 108

Other matters | 19 
and Wales (ICAEW) have been commissioned to carry out external quality
reviews.
57.  As part of our commitment to quality and continuous improvement, Audit
Scotland will periodically seek your views on the quality of our service provision.
We welcome feedback at any time, and this may be directed to the engagement
lead. 
108

Page 109

Other matters | 20  
North Ayrshire Council
Annual Audit Plan 2023/24 
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh  EH3 9DN
Phone: 0131 625 1500  Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0 
109

Page 110

110

Page 111

NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    Internal Audit Plan 2024/25 
Purpose:  To inform the Committee of the proposed internal audit plan for
2024/25. 
Recommendation:  That the Committee approves the internal audit plan for
2024/25. 
1. Executive Summary 
1.1 Internal Audit provides an independent and objective opinion on the Council’s risk
management, governance and control environment by evaluating its effectiveness.
This report presents the proposed internal audit plan for 2024/25. 
1.2 Prior to the start of each financial year, internal audit in conjunction with senior
management, put together a proposed plan of audit work.  The objective of our
planning process and subsequent plan is to put us in a position to provide a well-
informed and comprehensive annual audit opinion, based on sufficient and
appropriate coverage of key business objectives, associated risks, and risk
management processes. 
2. Background 
Internal Audit Plan 2024/25 
2.1 The outcomes of each of the audits in our planned programme of work will provide
senior management and Members with assurance that the current risks faced by the
Council in these areas are adequately controlled and managed. 
2.2 A number of factors are considered when putting together the risk based internal audit
plan for 2024/25, including: 
• Consultation with senior management;
• Review of the Council’s key objectives and Council Plan 2023-2028;
• Review of the Council’s fundamental business processes and key services;
• Review of the Council's current risk management framework, processes and risk
management maturity;
• Review of the key risks featuring in the Council's risk registers;
• Internal Audit’s own risk assessment based on knowledge of the business and
incorporating findings from previous internal audit work; and
Agenda Item 7
111

Page 112

• Internal Audit’s awareness of emerging regional and national risk factors. 
2.3 The approach to the delivery of the internal audit plan will be for it to remain flexible
throughout the year to respond to new and emerging risks. 2024/25 will be the first
year of the adoption of a new ‘rolling’ internal audit plan which will remain agile and
can be reviewed and updated on a continual basis. To meet this need for increased
flexibility, confirmed work will cover a maximum of a six month period with a rolling
forward plan of possible areas for future consideration. Changes to the internal audit
plan will be presented to the Committee for information through newly established
quarterly progress reports. This approach is fully in line with the new global internal
audit standards which require the audit plan to be risk-based and dynamic, reflecting
timely adjustments in response to changes affecting the organisation. 
2.4 Internal Audit has strong working relationships with all Council services, with services
regularly requesting advice and insight from Internal Audit. It is important that the plan
also continues to flex to allow for this work, which ensures Internal Audit advice is
offered to services in a timely manner, when it will add the most significant value to the
business needs. 
2.5 The documented risk assessment is based on a risk universe which is maintained by
internal audit but used to document the consultation which takes place between
internal audit and senior management. Management are welcome to feed into the risk
universe to help ensure it is updated on a continuous basis.  The risk universe
documents risk factors such as: 
• Links to the strategic priorities within the Council Plan for 2023-2028;
• Links to strategic, corporate and operational risk registers;
• Whether the auditable area is a source of significant risk;
• Whether there is significant value to the Council in the audit being carried out;
• known risk factors arising from local and national issues; and
• risk factors arising from previous internal audit work and knowledge of the Council. 
2.6 An overall conclusion is reached from an assessment of each risk area, which
categorises audits into the following priorities: 
• Priority A – a ‘must do’ audit based on risk (very high risk);
• Priority B – a ‘should do’ audit, time permitting (high risk);
• Priority C – a ‘may do’ audit, time permitting (moderate risk); and
• Priority D – an audit where the result would not be of sufficient value to the Council
(low risk). 
2.7 Examples of the key risk factors which have influenced the early part of the 2024/25
internal audit plan are as follows: 
• Transformation and change management is identified as a strategic risk for the
Council. Internal audit will focus on the governance arrangements in place to take
forward a programme of transformational change.
• Climate change is highlighted not only as a strategic risk for the Council, but also
recognised as a global risk. Internal audit will continue to be involved in work in this
area in a consultancy capacity while the service develops appropriate
measurements to demonstrate and track the route to net zero.
112

Page 113

• Cyber resilience is identified as a strategic risk for the Council. Added to this, most
global risk literature continues to identify cyber security as the number one global
risk. The Scottish Government’s cyber resilience framework is intended to support
public sector organisations to develop and improve their cyber security
arrangements. Internal audit will continue to base the next phase of cyber
resilience audits on aspects of this framework.
• Aids & Adaptations were subject to a detailed review in 2020/21. The service have
implemented a number of new controls in response to the audit action plan, and a
full review will be carried out to assess the effectiveness of the new controls.
• Pupil Equity Funding (PEF) was originally scheduled for late 2023/24 but has been
deferred to early 2024/25. This is a result of changes that the service has made to
the year end reporting arrangements for PEF and a request to include that within
the audit scope.
• Agency staff and workers remains a high risk for the Council. There are financial
risks of non-compliance with IR35 legislation.
• Revised national guidance for child protection was updated in 2023 and sets out
the responsibilities and expectations for all involved in protecting children. The
guidance aims to support the care and protection of children, and therefore a
review of compliance with the updated guidance is timely and of significant value. 
2.8 The aim is to produce an agile, dynamic, risk-based internal audit plan containing key
areas of coverage. The overall objective of the work of internal audit is to enable the
Senior Manager to form an evidence based independent opinion at the end of the year
on the adequacy of the Council’s internal control, risk and governance arrangements.
This opinion forms part of the Annual Governance Statement for the year which is
included within the Council’s financial statements. 
2.9 The benefit of a rolling internal audit plan is to be able to continually update this as
new areas of work are agreed. New audits are risk assessed and added to the rolling
plan which may mean lower risk audits are delivered at a later date. If a new audit
area arises which is of such significant risk, this could lead to previously agreed work
being deferred. As noted above, any such changes will be presented back to the
Committee for information through newly established quarterly reports. 
2.10 Internal audit coverage can never be absolute, and responsibility for risk management,
governance and internal control arrangements will always remain fully with
management. As such, internal audit cannot provide complete assurance over any
area, and equally cannot provide any guarantee against material errors, loss or fraud. 
2.11 Appendix A contains the internal audit plan for quarters one and two of 2024/25. The
plan will be added to throughout the year, with a list of potential audit areas provided
at Appendix B. Audit titles and high level scopes are indicative at this stage for
planning our resources. At the start of each audit, detailed planning will be carried out
to agree the objectives and the scope of the work. The plan will therefore be subject to
change throughout the year, depending on a number of factors such as available
resources, time required to complete reviews, and unplanned work arising throughout
the year. 
2.12 The Senior Manager is required to ensure that internal audit resources are
appropriate, sufficient and effectively deployed to achieve the approved plan. The
Internal Audit Team currently comprises a Senior Manager, an Internal Audit Manager,
two Internal Auditors and a Computer Auditor.  All members of the team hold
113

Page 114

professional accountancy or audit qualifications and are suitably experienced. A
known vacancy will arise in 2024/25 which may impact on the internal audit activity for
the year. 
2.13 In addition to the programme of audit work to be carried out, time is also required to be
set aside throughout 2024/25 to support the following areas: 
• Consultancy – both ad hoc advice and project work
• Follow up of prior year internal audit action points
• Audit planning and monitoring
• Committee attendance and reporting
• Development of the internal audit service
• Self-assessments and external quality assessments against PSIAS
• Review of governance documents such as Codes of Financial Practice and the
Annual Governance Statement. 
2.14 A further fundamental development taking place during 2024/25 is the new global
internal audit standards. These were released in January 2024, with full
implementation due from January 2025. The changes to the global standards will have
a knock-on effect on the PSIAS. The Internal Audit Standards Advisory Board (IASAB)
will meet soon to discuss the impact on the PSIAS, with the aim of refreshing the
standards for implementation at the same time as the global standards in January
2025. This will potentially mean changes to processes, procedures and working
practices which will need to take priority during the year to ensure ongoing compliance
with the PSIAS. The volume of work this may entail is currently unknown. 
Internal Audit Performance 
2.15 As part of the new progress reporting regime, we will report on internal audit
performance. The following targets will be used to measure the performance of the
internal audit activity: 
Performance Measure Performance Target
Delivery of internal audit plan – percentage completed
at year end
>85%
Quality of audit work – overall client satisfaction >90%
Outcomes from audit work – value to the organisation >90% 
Conformance with the Public Sector Internal Audit Standards (PSIAS) 
2.16 The work of Internal Audit is governed by the requirements of the Public Sector
Internal Audit Standards (PSIAS) 2017. The standards, issued jointly by the Chartered
Institute of Public Finance & Accountancy (CIPFA) and the Chartered Institute of
Internal Auditors (IIA), require the Senior Manager (Audit, Fraud, Safety & Risk) to
establish a risk-based internal audit plan to determine the priorities of the internal audit
activity, consistent with the Council’s goals and objectives. 
2.17 Every five years, Internal Audit is subject to an External Quality Assessment (EQA)
covering the activity of the service. The last of these was carried out in July 2022, and
reported to the Committee in September 2022. The assessment confirmed
conformance with the PSIAS. A regular self-assessment process confirms ongoing
compliance.
114

Page 115

2.18 The Internal Audit Charter is a formal document which defines the internal audit
activity’s purpose, authority and position. The Senior Manager reviews the Internal
Audit Charter on an annual basis and presents any changes to the Audit and Scrutiny
Committee for approval. The Internal Audit Charter has been reviewed and there are
no material changes identified at this time. It is likely that a refreshed Internal Audit
Charter will be required in March 2025, to take account of the new internal audit
standards. 
3. Proposals 
3.1 It is proposed that the Committee approves the Internal Audit plan for 2024/25. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Consultation has taken place on an individual basis with the Executive Leadership
Team during the preparation of the Internal Audit plan. 
Mark Boyd
Head of Service (Finance) 
115

Page 116

For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None. 
116

Page 117

Internal Audit Plan 2024/25 Quarters 1 & 2 Appendix A
Audit Area to Deliver in Plan Directorate/Service Planned Quarter Priority Link to Council Plan Link to Risk Registers
Transformation and Change Management Corporate Q1 A
A Sustainable Council – a Community Wealth Building
Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities
Strategic Risk
ICT - Environmental and Physical Security People & ICT Q1 A
A Sustainable Council – a Community Wealth Building
Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities
Strategic Risk
ICT - Access Control People & ICT Q1 A
A Sustainable Council – a Community Wealth Building
Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities
Strategic Risk
Aids & Adaptations HSCP Q1 B Wellbeing – to transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people Operational Risk
Pupil Equity Funding Education Q1 A Wellbeing – to transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people Operational Risk
Accounts Payable Transaction Testing Finance Q1/Q2 A
A Sustainable Council – a Community Wealth Building
Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities
N/A
ICT - Information Security Management People & ICT Q2 A
A Sustainable Council – a Community Wealth Building
Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities
Strategic Risk
Locality Planning Communities & Housing Q2 B Communities and Local Democracy – we will have active,
inclusive and resilient communities Operational Risk
Community Care store HSCP Q2 A Wellbeing – to transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people N/A
Agency Staff & Workers People & ICT Q2 A N/A N/A
Child Protection HSCP Q2 A Wellbeing – to transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people Operational Risk
Tenants & Residents Associations Communities & Housing Ongoing D Communities and Local Democracy – we will have active,
inclusive and resilient communities N/A
Consultancy - Sustainability & Climate Change Place Ongoing A Climate Change – achieving net-zero by 2030 Strategic Risk
Consultancy - Waste Review Place Ongoing B Climate Change – achieving net-zero by 2030 N/A
117

Page 118

Rolling Internal Audit Plan Appendix B
Potential Future Audit Areas Directorate/Service Priority Link to Council Plan Link to Risk Registers
Corporate Performance All B All N/A
Advisory - Equalities Democratic B N/A Strategic Risk
Freedom of Information Democratic A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities
Corporate Risk and
Operational Risk
Capital Monitoring Finance B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Strategic Risk
Health & Safety Finance C N/A N/A
Absence Management People & ICT A N/A N/A
Community Based Support - Young People HSCP B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk
Procurement Finance B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Payroll Transaction Testing People & ICT A N/A N/A
Income Collection Finance A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Care Homes - sustainability HSCP B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
ICT - Asset Management People & ICT A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Strategic Risk
Fuel Controls Place B N/A N/A
Overtime Controls in Streetscene Place B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Flood Programme Place B Climate Change – achieving net-zero by 2030 Strategic Risk and
Operational Risk
Advisory - Decriminalised Parking Arrangements Place C N/A N/A
Ayrshire Growth Deal Place A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Operational Risk
Homelessness Communities &
Housing A Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Financial Assessments - non-residential HSCP C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Overtime controls in HSCP HSCP B N/A N/A
Social Care Establishments HSCP C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Integration Joint Board Audit Days IJB A N/A N/A
Shared Prosperity Fund Place C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Community Associations Communities &
Housing B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk
Stores Controls Communities &
Housing C N/A N/A
These reviews will form part of the rolling plan for 2024/25. The plan will continue to be adjusted as the year progresses to reflect current organisational risks and issues. Ongoing risk assessments will be
undertaken to determine the priority areas to include in the plan.
118

Page 119

NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports Issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed between January and February 2024. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed between January
and February 2024.  Internal control reviews have been completed in respect of the
areas detailed in Appendix 1 to this report. The aim of these reviews is to provide
assurance that the internal control framework within the areas examined is appropriate
and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit. 
2.3 The findings from four separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below:  
Agenda Item 8
119

Page 120

Audit Title Assurance Level
IJB Workforce Planning Substantial
Workforce Planning Substantial
Standalone Early Years Centres Reasonable
Community Resources Keyholding Substantial 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between January and February 2024. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
120

Page 121

Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None.
121

Page 122

IJB WORKFORCE PLANNING 
1 Background  
1.1 In March 2022 the Scottish Government (SG) published its ‘National Workforce
Strategy for Health and Social Care in Scotland’ strategy.  The aim was to support
the ‘recovery, growth and transformation’ of the Health and Social Care
workforce. 
1.2 As part of this strategy the SG required HSCPs to produce a 3 year workforce
plan.  These plans were intended to support HSCPs, but also the SG, in shaping
future workforces.  
1.3 In accordance with SG timescales, the HSCP’s Workforce Plan was submitted to
the SG in October 2022.   
2 Objectives and Scope  
2.1 The scope of this Audit was to ensure that:- 
• The Workforce Plan addresses the key questions set by the SG
• Consideration has been given to the workforce available via third party and
voluntary organisations
• The Plan aligns with local financial Plans and highlights any issues with
achieving the required future workforce
• There is robust evidence to support the information included within the
Plan 
3 Findings  
3.1 The key questions the SG requires to be addressed by the Workforce Plan are:-
• What are your current service demands (including recovery requirements
and projected Board/HSCP population health needs), and the workforce
requirements associated with these? 
• What is your current staffing profile (including quantitative detail)? 
• What is the establishment gap between projected service demand and your
current staffing profile? 
• What actions are you taking at a local level, in accordance with the 5 pillars
of workforce set out in the Strategy, to support service growth and
transformation, in line with your gap analysis?   
Question - What are your current service demands (including recovery
requirements and projected Board/HSCP population health needs), and the
workforce requirements associated with these? 
3.2 The HSCP’s Workforce Plan recognises the global and national pressures
currently affecting the HSCP.  Statistics highlighting:- 
• the current, and projected future demographics of North Ayrshire
• the current, and projected levels of health concerns for North Ayrshire
residents
122

Page 123

have been included in the Plan.  
3.3 Audit has agreed these statistics to robust sources. 
3.4 The Plan also details the workforce pressures facing services.  These pressures
were identified by issuing questionnaires to Senior Managers.  
3.5 Managers were asked to detail:-
• The key workforce challenges facing their service/team at that moment
• Current service gaps (including vacancies and newly required posts) within
their service/team at that moment  
3.6 Manager responses were made available to Audit.  
3.7 Manager responses were summarised for inclusion within the Plan.  Prior to the
Plan being submitted to the SG it was reviewed by both the PSMT and IJB.  Audit
has placed reliance on this review process providing assurance that no key points
have been lost during the summary process. 
Question - What is your current staffing profile (including quantitative
detail)? 
3.8 The Workforce Plan report contains statistics on the current workforce.  This
includes:-
• Employee numbers, FTE and contract type
• Employee composition – eg gender, age, disability, ethnicity
• Employee turnover and absence rates  
3.9 Audit was able to agree the above statistics to source documents.   
Question - What is the establishment gap between projected service
demand and your current staffing profile? 
3.10 Projections for the additional Social Workers, Social Work Assistants, Nursing
and Midwifery posts that will be required have been calculated and included in the
Workforce Plan report.  
3.11 At present there is no universal method of projection prescribed by the SG,
therefore HSCPs must apply the method they feel most appropriate.  The report
therefore details the method of calculation used for each post.  
3.12 Audit has confirmed the accuracy of the calculation – based on the method
chosen by the Project Team.  
3.13  In addition to the above projections, Senior Managers were asked to consider the
future establishment gaps within their service by responding to the following
questions within the Workforce Plan questionnaire:-
• goals/developments for service within the next 12-18 months
• staff required to achieve this
• risk if these developments are not achieved  
• goals/developments for service within the next 3 years
123

Page 124

• staff required to achieve this
• risk if these developments are not achieved.    
3.14 Manager responses were made available to Audit.  
3.15 The responses were summarised for the Plan and used to set out the direction
each service team hopes to take over the next 12 months and the next 3 years. 
In addition, a table showing the breakdown of current staff shortages, staff
required by 31 March 2023 and staff required by 31 March 2025 has been
included as an appendix.  
3.16 The report makes clear that the above projections and intentions are aspirational
as funding from the SG had not been confirmed for future years. 
Question - What actions are you taking at a local level, in accordance with
the 5 pillars of workforce set out in the Strategy, to support service growth
and transformation, in line with your gap analysis?  
3.17 The Workforce Plan report includes a detailed action plan which sets out the
HSCPs approach to building the workforce it needs over the next 3 years.  
3.18 The action plan contains 31 actions and is structured into 5 sections which align
with the ‘5 pillars of the workforce journey’ as defined by the SG (Plan, Attract,
Train, Employ, Nurture).  
3.19 The SG required a refresh of the action plan to be submitted by 31 October 23.    
3.20 To facilitate this refresh, Services were asked to:-
• Confirm the status of the action – eg Ongoing, Complete or to be Removed (if
it is no longer appropriate)
• Confirm if the action is being delivered as expected – with a traffic light system
used (red, amber, green) to measure the extent of delivery.
• A brief narrative update on the action, identifying progress to date and any
future developments to be undertaken. 
3.21 The HSCP missed the submission deadline due to issues with identifying
responsible officers for 5 of the actions (as of 6th November 23).  The Project
Team intends to take this issue to the Partnership Senior Management Team for
guidance. (action point a)  
3.22 The Project Team intend to submit the updated Action Plan to the IJB in due
course.   
Third Party and Voluntary Organisations  
3.23 These bodies have an important role in the overall provision of care in North
Ayrshire.    
3.24 To gain an understanding of the anticipated workforce of these parties in the next
3 years, questionnaires were sent out via TSI (Third Sector Interface North
Ayrshire).  
124

Page 125

3.25 The questionnaire asked the same key questions that were asked of HSCP
managers (as noted in 3.5 and 3.13 above).  
3.26 Responses were summarised by ACVS.  A detailed section highlighting the key
pressures and risks facing this sector was included within the report.     
Alignment with local financial plans  
3.27 Within the HSCP’s 2023-2026 MTFO (Medium Term Financial Outlook) there is a
section dedicated to recognising ‘Workforce Challenges’.  This references the 3
year Workforce Plan and Action Plan.  
3.28 The MTFO highlights there is uncertainty over SG settlements for 2024/25
onwards.  This uncertainty makes future recruitment plans aspirational.    
3.29 The HSCPs Strategic Commissioning Plan 2022-30 also makes reference to the
importance of workforce development and acknowledges that a Workforce Plan
was due to be prepared which would assist with this. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard the details presented
within the IJB Workforce Plan. 
4.2 The ability to deliver is dependent on a number of factors, not all of which are
within the control of the HSCP. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
125

Page 126

KEY FINDINGS AND ACTION PLAN
IJB WORKFORCE PLAN 
Action a
Finding Responsible Officers have not been appointed for some Plan
Actions.
Action Description Responsible Officers should be identified as soon as possible. 
Action updates should be sought in order to allow the Action
Plan refresh to be completed and submitted to the SG.
Risk Lack of ownership for Actions may result in them being
overlooked 
Priority (1, 2, 3) 2
Paragraph Reference  3.21
Managed by Paul Doak, Head of Service (Finance and Transformation)
Assigned to Seony Ross, Team Manager (Strategic Planning and
Equalities)
Due Date 29/02/2024
Management Comment Responsible officers will be identified for the 5 outstanding
actions to ensure that delivery of these is progressed. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
126

Page 127

WORKFORCE PLANNING 
1 Background  
1.1 Workforce planning is a tool that allows the Council to plan now for the workforce
that it requires in the future.  
1.2 The composition and key skills of the workforce are likely to change going forward
as the Council continues to adapt to factors such as the changing demographic of
residents, changes in technology, external pressures and financial shortfalls. 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure that:-
• the Council has guidance and procedures available to support services
• workforce plans are sufficiently detailed and reviewed regularly
• steps are being taken to maximise current staff retention
• current workforce decisions are being made with a view to future workforce
requirements 
3 Findings  
3.1 The responsibility for workforce planning lies with services. 
Guidance and Procedures  
3.2 The Council has a Workforce Strategy.  This sets out the Council’s approach to
workforce planning including the methodology, tools and processes to be used by
services. 
3.3 In addition, a number of documents are available to give services practical
information on how to tackle workforce planning.  These documents include case
studies, detailed examples, checklists and questions to consider during planning.  
3.4 Power BI reports are available to services.  These give data on workforce
composition such as headcount, contract types, age split of staff, grade, leavers,
new starts and grade progression.     
Service Plans  
3.5 A Workforce Plan template is used by all services.  This template is designed to
help services consider all factors, both internal and external to the Council, that are
likely to impact their ability to deliver services going forward.  
3.6 This template includes the following:-
• PESTLE analysis (Political, Economic, Social, Technological, Legal and
Environmental).  The likely impact of each of these on the Service must be
considered and documented.
• People Implications analysis.  This requires services to consider succession
planning, talent pipeline, composition of workforce/demographics, areas of
growth, areas of decline.  
127

Page 128

• Change Planner.  This records the anticipated benefit of changes as well as
the impact these will have on existing posts – including creations, deletions
and re-gradings.
• Action Plan.  This requires services to allocate ‘short’, ‘medium’ or ‘long-
term’ timescales to the key actions required to implement change.  
3.7 The Council’s Workforce Strategy requires services to update their workforce plans
6 monthly.  HR play an active role in supporting services with these updates.  
3.8 Audit reviewed the current plans for all services and confirmed that all had been
updated approximately 6 months after the previous version.    
3.9 ELT receive an annual summary of all workforce plans, at a Directorate level.   
Current Staff Retention  
3.10 The ability to retain skilled staff is key for workforce planning.  
3.11 Employees are more likely to stay with an employer if they feel that their needs are
being considered, and that they are valued.  The Council aims to create such an
environment by:-
• Providing opportunities for employees to upskill or retrain
• Offering work/life balance opportunities 
• Providing wellbeing services  
3.12 Upskilling and retraining opportunities include:-
• The Council’s Leadership Academy - which upskills employees for
management roles  
• Current employees having the opportunity to apply for modern, trade and
graduate apprenticeships
• retraining opportunities – these are targeted at areas where recruitment has
been historically difficult – such as teachers and social care 
• Creation of career paths – which provide employees with a clear career
progression route  
3.13 The Council’s Work Life Balance policy gives employees the opportunity to amend
their work patterns to give a better balance between their work and home life
requirements.    
3.14 A number of policies are in place to support employee wellbeing.  These include:-
• Staff benefits/perks
• Buying Annual Leave scheme
• Maternity, Adoption, Paternity and shared parental leave
• Special Leave
• Occupational Health
• Stress management/support (counselling)
• Wellbeing Warriors
• Bereavement leave
• Endometriosis support
• Livewell (health and wellbeing programme run by council staff)
128

Page 129

• Employee welfare guidance (on topics such as needlestick injuries,
addictions, domestic abuse etc)
• Travel Smart 
Future Workforce  
3.15 Vacancy management plays a key role in allowing the Council to realign its
workforce, whilst minimising the need for compulsory redundancies.  
3.16 The Council’s Vacancy Scrutiny Panel ensures that only vacancies in alignment
with workforce plans are filled.  A post cannot be advertised without the pre-
approval of this Panel (with the exception of posts on the exemption list).   
3.17 In addition to standard recruitment methods, the Council is looking to attract talent
by offering alternative routes into employment, using schemes such as:-
• Modern Apprenticeships
• Graduate Apprenticeships
• Skills for Life
• Streetscene Environment Skills Training Academy
• Developing the Young Workforce
• Care at Home Pilot 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard the Council’s approach to
Workforce Planning.  
4.2 The Council is taking steps now to ensure its workforce is equipped to deliver future
services. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.
129

Page 130

STANDALONE EARLY YEARS CENTRES 
1 Background  
1.1 The Council has 4 standalone early years centres (EYCs) – Castlepark, Dalry,
Largs and Springvale.  
1.2 Prior to August 2023 Kilwinning Early Years was also classed as a standalone
Centre.  In August the status of this Centre was changed to ‘early years class’
and is now under the leadership of Pennyburn Primary School.  Despite the
recent change of status, this location has been included within the scope of the
audit due to it being excluded from the primary school audit in 2022/23.  
1.3 This audit was performed by requiring all standalone centres to complete a self-
assessment questionnaire and provide supporting documentation.  Each
response was reviewed in detail and followed up as necessary.  In addition, a
sample of centres were visited to allow more detailed audit testing to be
performed. 
2 Objectives and Scope  
2.1 The questionnaire and detailed testing were designed to gain assurance that:- 
• Staff are aware of all relevant Council governance procedures.
• All cash is being held securely and is being properly managed.
• Cash withdrawals made via the Procurement Card are being used for
appropriate types of expenditure, and all transactions are being properly
recorded.
• A full audit trail exists for all toy fund (equivalent of school fund) income
and expenditure transactions.
• Detailed Inventory records are being maintained. 
3 Findings   
Governance  
3.1 Each Head of Centre was asked to confirm they were aware of a number of key
Council policies and had completed a number of key training courses.  2 Heads
were able to give full assurance.  Audit has requested the remaining 3 Heads
familiarise themselves with the policies and complete any outstanding training as
soon as possible.  
3.2 All Centres confirmed that the relevant staff have completed cash holding and fire
warden training.  
3.3 The Council’s Risk Assessment Guidance states that ‘if there are no accidents or
near misses relating to the work activity, no changes to personnel, environment,
procedures, equipment etc, then it is acceptable for a Low rated Risk Assessment
to be reviewed every 2 years. However, an annual risk assessment review is best
practice’.  
130

Page 131

3.4 Audit reviewed all Centres’ risk assessment registers, on the basis that no
assessments should exceed 2 years old.  Only 1 Centre has assessments
exceeding the 2-year maximum timescale.  This Centre has agreed to review all
assessments as a matter of urgency. 
Cash Holding  
3.5 All Centres have keyholder registers in place to formally record who has access
to cash storage locations.  
3.6 All Centres are aware of the maximum level of cash they are insured to store on
site.  
3.7 The only cash being held on site at all Centres relates to their Toy Fund.   
GPC cash  
3.8 Centres do not use GPC cash.  
3.9 Audit has confirmed with eProcurement that the cash withdrawal facility is
deactivated on all cards. 
Toy Fund  
3.10 The Kilwinning Centre Toy Fund was amalgamated with Pennyburn Primary’s
School Fund in August 2023.  School staff manage this Fund with no input from
Centre staff.  
3.11 The remaining 4 Centres all hold fund cash income on site and 2 hold petty cash
for small purchases.  
3.12 Audit has requested that Education give consideration to stopping the use of petty
cash in Centres.  The Centres not using petty cash provide an example of how
this can be achieved. (action point a)  
3.13 All Centres provided examples of the documentation used to record and authorise
Fund expenditure, however detailed testing did highlight instances where verbal
authorisation has been used.  Audit has raised this issue directly with the relevant
Centres.  
3.14 Instances of reconciliations not being formally documented were also identified
during testing.  Audit raised this directly with the relevant Centres.  
3.15 At the time of the Audit, Education was in the process of updating its procedure
for managing School Funds.  Education has confirmed this will be circulated to all
officers involved in the administration of the School and Toy Funds as soon as it
is finalised.   
Inventory  
3.16 Audit requested copies of inventory records from all Centres.  
131

Page 132

3.17 Detailed testing highlighted that not all records are up to date.  Audit has raised
this issue directly with the relevant Centre.  The Centre has agreed to review and
update its inventory records.   
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the areas covered by
this Audit. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
132

Page 133

KEY FINDINGS AND ACTION PLAN
STANDALONE EARLY YEARS CENTRES 
Action a
Finding Some Centres are using petty cash for Toy fund expenditure.
Action Description Centres should stop using petty cash for making payments. 
Risk Increased risk of theft or loss associated with holding cash
Priority (1, 2, 3) 2
Paragraph Reference  3.12
Managed by Andrew McClelland, Head of Service (Education)
Assigned to Lynn Taylor, Senior Manager Resources and Infrastructure
Due Date 28 June 2024
Management Comment Engagement with EBOs will take place to make arrangements
to stop using petty cash and transfer to on-line banking by the
end of this academic session. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
133

Page 134

COMMUNITY RESOURCES KEY HOLDING 
1 Background  
1.1 There is a requirement for local authorities to ensure:
• efficient use of buildings
• creative operations
• reducing costs
• encouraging community organisations 
1.2 The Community Resources Council Team’s mission statement is “To make
available safe, clean, comfortable and fit for purpose accommodation in which a
range of learning, recreation and wellbeing activities and events can take place.
Thus, enhancing the lives of the people living or visiting North Ayrshire.” 
1.3 There are 155 groups with 212 keyholders, 179 of whom are external keyholders.
These arrangements apply to the majority of the Community Facilities that the
Council operates. 
1.4 This audit is reviewing the current key holding processes in Community Halls. 
2 Objectives and Scope  
2.1 The objective of this audit was to assess the process surrounding the management
of keyholding of community halls transferred to Community Groups within North
Ayrshire to ensure:- 
• the client meets the requirements of NAC to make use of the community
asset.
• the process is open and transparent.
• maximising the assets use potential efficiently and producing savings.
• the asset remains secure, 
3 Findings 
Community Benefit  
3.1 The 2023 Community Risk Register identified 14 keys areas. Of these 8 directly
impacted on the running of community halls. Risks identified include budgetary,
asset sustainability, heath and safety, inability to meet expectations due to reduced
staffing, reduction of external grant funding and reduced building maintenance
leading to buildings becoming unusable. 
3.2 Mitigations for these risks have been identified and the Council’s Community
Resource Team are working with community groups to achieve these. The
Council’s policy is to assist local community to take over the running of centres
through security awareness, key training and basic site management. 
3.4 The role of the team is to make the most cost-efficient use of the community assets
by creating opportunities for Community Associations, by establishing confidence
134

Page 135

and empowering the community to take on the responsibility for running the lets
and achieving efficiency savings. 
3.5 The process for assessing, preparing, and guiding community groups to achieve
this is established and each request is reviewed on an individual basis. There are
a wide range of groups including community associations, health support groups,
arts and crafts, exercise clubs, music and pupil support, all meeting the needs of
the local community.   
Support 
3.6 The Community Resource Team have been using Microsoft Forms to efficiently
collate and record responses from their clients. In the case that the client doesn’t
have access to IT, the form is printed and manually completed. This document is
the basis of the Keyholding register and completion of client documentation and
training needs. The register also tracks actions by the team to ensure completion,
reducing replication of actions. 
3.7 Comprehensive risk assessments and fire evacuation plans have been completed
for each of the community halls. Every group are required to complete the
associated training. Surveys are issued every six months to keyholders, to ensure
they remain confident in building operations and safe systems of work, and to allow
for any potential improvements to be identified. These are reinforced by regular site
visits. 
3.8 All sites visited had current Liability Insurance certificates publicly displayed as well
as fire and maintenance records. Physical security of buildings is managed through
key safes controls which are updated annually. Risk assessment guidance relating
to potential security issues are documented and provided to the keyholders.  
3.9 A visit to Irvine Library identified the role of libraries in helping fill community gaps.
Examples included clubs, study groups and commercial access support for banking
services that are disappearing from the communities.   
Efficiencies 
3.10 Cost centre budget statements are reviewed regularly by the Team Manager. This
statement provides an overview spend for the year to date, previous year and
forecast over or under. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to keyholding
management of community halls. 
4.2 The proactive use of available IT for collating and recording and supporting
community is commendable.   
135

Page 136

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.
136

Page 137

1 
NORTH AYRSHIRE COUNCIL 
21 March 2024 
Audit and Scrutiny Committee 
Title:    Internal Audit and Corporate Fraud Action Plans: 
Quarter 3 update 
Purpose:  To advise the Audit and Scrutiny Committee on the
progress made by Council Services in implementing the
agreed actions from Internal Audit and Corporate Fraud
reports as at 31 December 2023. 
Recommendation:  That the Committee notes the current position with the
implementation of Internal Audit and Corporate Fraud
actions. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in
Scotland' highlights that Audit Committees should monitor and review the
progress made in implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented.  This provides
assurance that identified control weaknesses have been addressed and are
being managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action.  This enables
Internal Audit to monitor progress on a 'real-time' basis and address any delays
in implementation. 
1.4 This report details the position as at 31 December 2023. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 14 November 2023
highlighted that there were 11 actions outstanding at the end of September
2023: three that had not been started or were partially implemented, and eight
where the due date had not yet passed. 
2.2 In addition to these 11 carried forward actions, there have been 10 new actions
agreed, giving a total of 21 action points for review. 
Agenda Item 9
137

Page 138

2
2.3 Services have completed 12 actions since the last report.  All Council Services
are required to retain evidence of work carried out in completing their actions
and Internal Audit carries out 'spot-checks' on a sample of completed actions
on an ongoing basis. 
2.4 Of the remaining 9 actions, none of these are noted as overdue as they are all
due for completion after 31 December 2023. 
3. Proposals 
3.1 It is proposed that the Committee notes the current position with the
implementation of Internal Audit and Corporate Fraud actions. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud
actions helps to support the efficient delivery of the strategic priorities within the
Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
138

Page 139

3 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud,
Safety and Risk), on 01294 324524. 
Background Papers
None.
139