North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 25 January 2024 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 14 November 2023 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Annual Report – School and Early Learning and Childcare
Inspections 2022-23
Submit report by the Executive Director (Communities & Education)
informing of the performance of North Ayrshire schools and early learning
and childcare settings in external inspections, with a focus on those
published during session 2022-23 (copy enclosed). 
4 Education Authority Annual Plan 2023-24
Submit report by the Executive Director (Communities & Education)
seeking approval for the publication of the Education Authority Annual
Plan for 2023-24 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 HMIe Progress Review of Community Learning and Development
Submit report by the Executive Director (Communities & Education)
informing of the outcomes of the recent Progress Review of Community
Learning and Development by HMIE (copy enclosed). 
6 North Ayrshire Council’s Performance Strategy 2023-28
Submit report by the Head of Service (Democratic) advising of the
Council’s Performance Strategy 2023-28, including a new approach to
self-assessment (copy enclosed). 
7 Year End Performance Reporting: Council Plan Year End Progress
Report 2022-23; and Local Government Benchmarking Framework
Analysis of 2023 Data Release
Submit report by the Head of Service (Democratic) advising on progress
of the Council Plan priorities (copy enclosed). 
8 North Ayrshire Council Plan 2023-28: Performance Management
Framework
Submit report by the Head of Service (Democratic) on the Council Plan
2023-28 Performance Management Framework, attached at Appendix 1
to the report (copy enclosed). 
9 Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed between November and December 2023 (copy
enclosed). 
10  Urgent Items
Any other items which the Chair considers to be urgent. 
11  Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland)
Act 1973, to exclude from the Meeting the press and the public for the
following item of business on the grounds indicated in terms of Paragraph
1 of Part 1 of Schedule 7A  of the Act.  
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer. 
12  Investigation Reports Issued (Exempt Item)
Submit report by the Head of Service (Finance) informing of investigation
reports finalised since the last meeting of the Committee (copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However,
by entering the Council Chambers, using the press or public seating area
or (by invitation) participating remotely in this meeting, you are consenting
to being filmed and consenting to the use and storage of those images and
sound recordings and any information pertaining to you contained in them
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. If you
do not wish to participate in a recording, you should leave the
meeting.  This will constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely
to cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

Audit and Scrutiny Committee
14 November 2023 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Davina McTiernan, Donald L. Reid and John
Sweeney. 
Present (Remote Participation)
Tom Marshall. 
In Attendance 
C. Hatton, Chief Executive; P. Doak, Head of Service (Finance and Transformation)
(Health and Social Care Partnership); A. McClelland, Head of Service (Education)
(Communities & Education); M. Boyd, Head of Service (Finance), D. Forbes, Senior
Manager (Financial Management), A.M. Fenton, Team Manager (Internal Audit) and
K. Gray, Team Manager (Corporate Fraud) (Finance), T. Reaney, Head of Service
(Neighbourhood Services) (Place); F. Walker, Head of Service and B. Quigley,
Senior Manager (People & ICT), and A. Craig, Head of Service (Democratic), I.
Hardy, Team Manager (Corporate Policy and Performance), C. Stewart and S.
Wilson, Committee Services Officers (Chief Executive’s Service). 
Also in Attendance 
F.M. Knight and D. Jamieson, Audit Scotland. 
Chair
Councillor Bell in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors 
2. Minutes 
The Minutes of (i) the Ordinary Meeting of the Audit and Scrutiny Committee held on
5 September 2023; and (ii) the Special Meeting held on 12 September 2023 were
confirmed and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7
of the Local Government (Scotland) Act 1973. 
3. Elected Member Development 
Submitted report by the Head of Service (Democratic) providing information and
seeking views on the development sessions provided to Elected Members over the
13 months from May 2022 to 30 June 2023, and on future planned developments.
Agenda Item 2
5

Page 6

Members asked questions and were provided with further information in relation to
the following:- 
• the turnout of some of the development sessions, including timing issues, and
the suggestion that there should be a number of events on the same day in
order to promote/enhance attendance; and
• the request by Strathclyde Fire and Rescue to hold a development session
with Elected Members which would be followed up by officers, as appropriate. 
The Committee agreed (a) to note the feedback provided on (i) the Elected Member
Development sessions held in the period May 2022 to June 2023 (ii) means to
support Elected Member attendance, (iii) how future programmes might be improved
and (iv) possible additional topics for the next year; and (b) otherwise, to note the
content of the report. 
Councillor McTiernan joined the meeting during consideration of this item. 
4. 2022/23 Elected Member Requests Report 
Submitted report by the Head of Service (Democratic) informing of the Council’s
performance and the volumes and trends of Elected Member requests handled in
Financial Year 2022/23. 
Members asked questions and were provided with further information in relation to
the following:- 
• discussion on the increased number of requests and the reason(s) behind this;
• the nature and resilience of the EM Pro (Lagan) system particularly regarding
logging requests, and some issues surrounding reliability and downtime (particularly
over weekends);
• clarification on the treatment of multiple requests logged relating to the same issue
and whether they were logged as individual and separate request(s); and
• the nature of some requests and the general approach to recording email
enquiries some of these, subsequently, becoming Lagan reports (EM Pro) once
received. 
Noted. 
5. 2022/23 Complaint Report 
Submitted a report by the Head of Service (Democratic) informing of the Council’s
complaint performance and the volumes and trends of complaints received in
Financial Year 2022/23. The report detailed the volume of complaints received and
closed, complaints closed at each stage, complaint outcomes, the average time in
working days for a full response at each stage, complaints closed within timescale,
complaint timescale extensions, trends identified from upheld/partially upheld
complaints and changes or improvements made as a result of complaints and
compliments received. 
6

Page 7

Members asked questions and were provided with further information in relation to:- 
• the action plan that had been put in place by Waste Services, in order to be as
proactive, as possible, in terms of mitigating the risk of complaints being raised;
• email updates to Elected Members on missed bins; and
• the improved performance of the Waste Service. 
Noted. 
6. Audit and Scrutiny Committee Self-Evaluation 2023 
Submitted report by the Head of Service (Democratic) on the outcome of the annual
self-evaluation of the Audit and Scrutiny Committee. The findings arising from the
self-evaluation, together with improvement actions, were detailed in Appendices 1
and 2, respectively, to the report. 
Members asked questions and were provided with further information in relation to
the more proactive approach being adopted by Members of the Committee and the
suggestion that external training for Members could be beneficial to Members in
terms of enhancing their audit and scrutiny role. 
The Committee agreed to (a) note the findings of the self-evaluation as detailed in
Appendix 1 to the report; (b) approve the improvement actions identified in Appendix
2 to the report; and (c) to repeat the self-evaluation exercise on an annual basis. 
7. External Audit Reports on the 2022/23 Audit and Best Value Thematic
Work 
Submitted report by the Head of Service (Finance) on the annual audit report and the
Best Value Thematic Work reports for 2022/23 and to consider verbal reports by the
external auditor. Appendix 1 to the report detailed letters of representation to be
signed by the Head of Finance as the responsible officer for North Ayrshire Council.
The External Auditor’s report, which summarised the findings of their audit, was
attached as Appendix 2 to the report. 
Fiona Mitchell-Knight and David Jamieson of Audit Scotland provided a verbal report
on the appendices to the report, including highlighting key aspects in relation to the
findings of their audit. 
Members asked questions and were provided with further information in relation to:- 
• The timing of the issuing of the audit report;
• the action plans that would be drawn up by Services in relation to the external
audit findings including dormant accounts; and
• the accounting arrangements, including consolidation, of North Ayrshire Council
Leisure (KA Leisure) accounts, together with an explanation on the heritage
assets valuation. 
7

Page 8

The Committee agreed to (a) note (i) the findings of the 2022/23 audit of the financial
statements as contained in the external auditor’s annual report at Appendix 2 to the
officer’s report, (ii) the findings of the external auditor’s Best Value Thematic Work
report, (iii) the agreed Action Plan as outlined in Appendix 1 to each of the Reports
and (iv) that the action plan would be brought to the Committee for review; and (b)
approve the audited Annual Accounts for signature. 
8. External Audit Report on Best Value Thematic Work 2022-23 
Submitted report by Audit Scotland on Best Value Thematic Work 2022-23 which
included key messages and information on the scope of the audit. 
Noted. 
9. Internal Audit Annual Update Report – North Ayrshire Integration Joint
Board (IJB) 
Submitted report by the Head of Service (Finance) informing of the IJB’s annual
report for 2022/23 and the approved internal audit plan for 2023/24. 
Noted. 
10. Internal Audit Plan 2023/24: Mid-year Update 
Submitted report by the Head of Service (Finance) providing an update on progress
made in delivering the 2023/24 Internal Audit Plan. Appendix 1 to the report detailed
the approved Audit Plan for 2023/24. 
Members asked questions and were provided with further information in relation to
the following: 
• the reasons for the changes being made to the audit plan;
• the learning review of Self-Directed Support; and
• a request for information in terms of how many people were in receipt of Self-
Directed Support funding, including how many were currently on the waiting list
for Self-Directed Support funding. 
The Committee agreed (a) to note the current position with the 2023/24 internal audit
plan; (b) to approve the inclusion of one additional audit review in 2023/24; (c)
approve the deletion or deferral of four audits for consideration as part of the
2024/25 Internal Audit Plan; and (d) that Members of the Committee would be sent
information on how many people were in receipt of Self-Directed Support funding
including how many were currently on the waiting list for Self-Directed Support
funding. 
11. Corporate Fraud Team update report 
Submitted report by the Head of Service (Finance) on the work of the Corporate
Fraud Team between April and September 2023.  
8

Page 9

Members asked questions and were provided with further information in relation to
the very low numbers of Blue Badge misuse and the possible reason(s) behind this,
and whether new parking attendants might impact on misuse of Blue Badges. 
Noted. 
12. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) on the findings of the Internal
Audit work completed between August and October 2023. 
Members asked questions and were provided with further information in relation to
the following:- 
IJB Community Engagement 
• Closure of this action following publication on the HSCP website. 
Accounts Payable Transaction Testing Q2 
• How invoices were dealt with and whether automation would reduce errors. 
Carers (Scotland) Act 2016 
• The publication of updated guidance on the website. 
Early Years Provision 
• The availability of eligibility criteria, which could be shared with Elected
Members. 
Noted. 
13. Internal Audit and Corporate Fraud Action Plans: Quarter 2 update 
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 30 September 2023. Appendix 1 to the report provided full details
of three Internal Audit actions which were not completed within the agreed timescale. 
Members asked questions and were provided with further information in relation to
the reasons for the slight slippage in respect of the Glow Internal Audit action and
the expected completion date of this action. 
The Committee agreed to note (i) the current position with the implementation of the
Internal Audit and Corporate Fraud actions; and (ii) challenges which were faced by
those services which have not implemented actions within the previously agreed
timescales. 
9

Page 10

14. Strategic Risk Register 2023/24: Mid-year Update 
Submitted report by the Head of Service (Finance) providing an update on progress
with actions related to the Strategic Risk Register. The Strategic Risk Register
Report 2023/24, with detailed actions, was provided at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to
the following:- 
• the Financial sustainability scoring of the Council and that of the Health and
Social Care Partnership (HSCP) and the reasons behind the variance in terms
of the scoring between the Council and the HSCP;
• the future management structure, including governance arrangements, of the
HSCP (National Care Service); and
• Business continuity and resilience. 
Noted. 
15. Exclusion of the Public – Para 14 
The Committee resolved in terms of Section 50(A)4 of the Local Government
(Scotland) Act 1973, to exclude from the Meeting the press and the public for the
following items of business on the grounds indicated in terms of Paragraph 14 of
Part 1 of Schedule 7A of the Act. 
16. Briefing on Cyber Security 
The Committee received a Briefing on Cyber Security by the Senior Manager (ICT). 
Noted. 
The meeting ended at 12.30 p.m.
10

Page 11

NORTH AYRSHIRE COUNCIL 
25 January 2024 
Audit and Scrutiny Committee 
Title:    Annual Report – School and Early Learning and Childcare
Inspections 2022-23 
Purpose:  To inform the committee of the performance of North Ayrshire
schools and early learning and childcare settings in external
inspections, with a focus on those published during session
2022-23. 
Recommendation:  It is recommended that the committee: 
(a) Notes the contents of this report; and
(b) Commends the performance of schools and ELC settings in
inspections conducted by Education Scotland and the Care
Inspectorate. 
1. Executive Summary 
1.1 Education Scotland published inspection reports on eight educational establishments in
North Ayrshire in session 2022-23. The overall performance of our schools and centres
was very positive. 
1.2 The Care Inspectorate published inspection reports on seven local authority early
learning and childcare establishments in North Ayrshire in session 2022-23.  The
performance of these establishments was positive. 
1.3 Action has been taken by individual schools and early years establishments, supported
by the education service, to celebrate strengths and to address areas for improvement
identified in the inspection reports. 
2. Background 
2.1 Schools are subject to periodic external evaluation by the national inspection agency,
Education Scotland.  Early Learning and Childcare settings are inspected by both
Education Scotland and the Care Inspectorate. 
2.2 Education Scotland reports on the quality of school and early years provision under the
following quality indicators, taken from the self-evaluation framework How good is our
school? (4th edition): 
• Leadership of change
• Learning, teaching and assessment
Agenda Item 3
11

Page 12

• Ensuring wellbeing, equality, and inclusion
• Raising attainment and achievement (primary, secondary, ASN schools)
• Securing children’s progress (Early learning & childcare settings). 
2.3 In 2022, the Care Inspectorate introduced a new quality framework for daycare of
children, childminding and school-aged childcare. This quality framework is structured
around the following key questions: 
• How good is our care, play and learning?
• How good is our setting?
• How good is our leadership?
• How good is our staff team? 
2.4  All inspections focus on at least two quality indicators.  In session 2022-23, Education
Scotland carried out eight school inspections in North Ayrshire as part of a national
sample size of 250 schools. 
2.5 Education Scotland uses a six-point scale to report on the performance of the
educational establishment in each of the assessed quality indicators.  The categories of
the six-point scale are: excellent, very good, good, satisfactory, weak, and
unsatisfactory.  Further detail on the meaning of the six-point scale is included at
Appendix 2. 
2.6 In session 2022-23, the Education Scotland inspection outcomes in North Ayrshire
schools were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Raising
attainment and
achievement
Ardeer Primary
School 07/03/2023 [Not assessed] Good [Not assessed] Very Good
Beith Primary
School 28/03/2023 Very Good Very Good Very Good Very Good
Greenwood
Academy 25/04/2023 Good Satisfactory Satisfactory Good
Auchenharvie
Academy 09/05/2023 [Not assessed] Very Good [Not assessed] Very Good
Glebe Primary
School 16/05/2023 Very Good Very Good Excellent Very Good
Skelmorlie
Primary School 16/05/2023 [Not assessed] Good [Not assessed] Good
Corrie Primary
School 29/08/2023 [Not assessed] Good [Not assessed] Good
Shiskine
Primary School 29/08/2023 [Not assessed] Good [Not assessed] Good 
2.7 In session 2022-23, the Education Scotland inspection outcomes in North Ayrshire early
years classes were as follows: 
School Inspection
Report
Date
1.3 Leadership
of change
2.3 Learning,
teaching and
assessment
3.1 Ensuring
wellbeing,
equality and
inclusion
3.2 Raising
attainment and
achievement
Ardeer Primary
Early Years 07/03/2023 [Not assessed] Very Good Not assessed Very Good
Beith Primary
Early Years 28/03/2023 Very Good Very Good Very Good Very Good
12

Page 13

Corrie Primary
Early Years 29/08/2023 [Not assessed] Good [Not assessed] Good
Shiskine
Primary Early
Years
29/08/2023 [Not assessed] Good [Not assessed] Good 
2.8 Since the introduction of the current inspection framework “How Good is our School?
(4th edition)” in session 2016-2017, there has been a total of 26 inspections by Education
Scotland across North Ayrshire’s schools and early years classes. Over that time frame,
the performance of North Ayrshire schools in Education Scotland inspections has been
positive overall.  By way of comparison in the table below, each grade has been
assigned a numerical value to show our average performance against the regional and
national performance.  The higher the value, the better the performance.   
Average grade assigned through Education Scotland inspection 2016-2023
(schools only):
Quality Indicator NAC 
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 4.45 3.85 3.75
Learning, teaching and assessment 4.21 3.82 3.69
Ensuring wellbeing, equality and inclusion 4.45 4.00 3.92
Raising attainment and achievement 4.17 3.78 3.67
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
Average grade assigned through Education Scotland inspection 2016-2023 (early
learning and childcare settings only (authority provision)):
Quality Indicator NAC
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 4.13 3.78 3.63
Learning, teaching and assessment 4.33 3.95 3.67
Ensuring wellbeing, equality and inclusion 4.25 4.10 3.96
Securing children’s progress 4.33 4.03 3.77
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.9 A further indicator of quality of educational provision overall is the percentage of school/
early learning and childcare inspections by Education Scotland which resulted in an
evaluation of “good” or better.  Data has been analysed since the introduction of the
current inspection framework in 2016-17 to the end of session 2022-23. Again, this
demonstrates a strong performance in North Ayrshire: 
Percentage of inspections resulting in an evaluation of “good” or better 2016-23
(schools only):
Quality Indicator NAC 
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 82% 64% 60%
Learning, teaching and assessment 88% 71% 62%
Ensuring wellbeing, equality and inclusion 82% 70% 69%
Raising attainment and achievement 83% 70% 61% 
13

Page 14

Percentage of inspections resulting in an evaluation of “good” or better 2016-23
(early learning and childcare settings only): 
Quality Indicator NAC
2016-23*
Regional
2016-23
(SWEIC)*
National
2016-23*
Leadership of change 75% 66% 59%
Learning, teaching and assessment 83% 72% 59%
Ensuring wellbeing, equality and inclusion 75% 73% 74%
Securing children’s progress 83% 75% 65% 
2.10 The Education Scotland inspection reports (at Appendix 1) highlight a number of key
strengths common to several of the establishments they visited in North Ayrshire in
2022-23.  Notable strengths have been identified in the following areas: 
• Positive professional culture and staff commitment, working well as a team.
• Positive relationships 
• Strong leadership of senior leaders
• Nurturing and inclusive learning environments
• Engaged and motivated learners
• Learning experiences which are meeting needs and reducing barriers to learning  
• Improved learning outcomes / attainment. 
2.11 Areas for improvement in North Ayrshire were identified through the inspection reports.
All reports always have at least one identified area for improvement. The improvement
actions frequently include the wording “continue to” or “further develop”, demonstrating
that establishments are already beginning to take steps to address these points. 
2.12 In session 2022-23 the performance of North Ayrshire Early Learning and Childcare
centres and classes in Care Inspectorate inspections was positive. Care Inspectorate
reports can all be accessed via the website.  A total of seven Local Authority Early Years
centres and classes and seven partner nurseries were inspected, the evaluations for
which are summarised in the tables below: 
Early Learning
and Childcare
Setting (NAC)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Mayfield Primary
School Nursery
Class
20/09/2022 Very Good Very Good Very Good Very Good
Caledonia
Primary School
Nursery Class
12/10/2022 Good Very Good Good Very Good
Blacklands
Primary School
Nursery Class
18/01/2023 Good Good Good Good
St Peter’s
Primary School
Nursery Class
27/02/2023 Adequate Good Good Adequate
St Mark’s
Primary School
Nursery Class
17/03/2023 Good Good Good Good
St Bridget’s
Primary School
Nursery Class
30/03/2023 Good Very Good Good Good
14

Page 15

Winton Primary
School Nursery
Class
16/05/2023 Good Good Good Very Good 
Early Learning
and Childcare
Setting (partners)
Inspection
Report
Date
KQ1: How good
is our care, play
and learning?
KQ2: How good
is our setting?
KQ3: How good
is our
leadership?
KQ4: How good
is our staff
team?
Treetops
Nursery (Irvine) 26/08/2022 Good Adequate Good Adequate
Bright
Beginnings Early
Years Centre
12/09/2022 Good Good Good Good
Treetops Too
(Saltcoats) 03/11/2022 Adequate Adequate Adequate Adequate
Rainbow
Childcare 23/11/2022 Very Good Very Good Very Good Very Good
Summerlea
House Nursery 21/03/2023 Good Good Good Good
Burnside House
Nursery 07/06/2023 Adequate Good Adequate Adequate
Treetops
Nursery (Irvine) 15/06/2023 Good Adequate Good Good 
2.13  The Care Inspectorate have recently updated their framework of quality indicators.
Nevertheless, in order to mirror the approach above (for Education Scotland
inspections) to providing trend information over several years, a calculation has enabled
average performances to be shown, covering the period 2016-23, both for North
Ayrshire’s local authority early learning and childcare settings, as well as for the South
West regional improvement collaborative.   
Average grade assigned through Care Inspectorate inspections in Early Learning
and Childcare (NAC settings):
New Quality Indicator
(from 2022-23)
Previous Quality
Indicator (before
August 2022)
North Ayrshire
Average
Performance 
2016-23*
SWEIC 
Average
Performance 
2016-23*
Quality of care, play and
learning 
Quality of care and
support 4.80 4.56
Quality of setting Quality of environment 4.69 4.42
Quality of leadership  Quality of management
and leadership 4.37 4.28
Quality of staff team  Quality of staffing 4.61 4.49
* 6 = Excellent; 5 = Very Good; 4 = Good; 3 = Satisfactory; 2 = Weak; 1 = Unsatisfactory 
2.14 Common strengths from the Care Inspectorate reports on early learning and childcare
settings in North Ayrshire in 2022-23 are: 
• Children are happy, settled, confident and motivated
• Children are having fun playing with their friends
• The staff are kind, caring, compassionate and nurturing towards the children
• Warm and welcoming environments are provided where children are supported with
their learning. 
2.15 Care Inspectorate reports included three areas for improvement in total for early
learning and childcare establishments in North Ayrshire in 2022-23.  Plans are in place
to address these. Similarly, for the two areas for improvement identified through
15

Page 16

previous inspections, the Care Inspectorate confirmed that improvements had been
made. 
2.16 As part of the service’s commitment to continuous improvement, inspection outcomes
have been used alongside feedback and engagement sessions with head teachers and
other senior officers, to feed into an evaluation of the service’s Quality Improvement
Framework, which has been refreshed and updated for session 2023-24. There is an
increased flexibility in approach, agreed at individual establishment level. The Quality
Improvement Framework is designed to give establishments, the service and elected
members assurance that self-evaluation is a key aspect of the work of our
establishments and that this leads consistently to planned improvements, based on
local contexts. 
3. Proposals 
3.1 It is recommended that the committee: 
(a) Notes the contents of this report; and
b) Commends the performance of schools and ELC settings in inspections conducted
by Education Scotland and the Care Inspectorate. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Council priorities: 
The external inspection activity confirms the focus of the Education Service is to align with
the Council Plan 2023-28 strategic aim to “transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people” and more specifically “improving
educational attainment and achievement and closing the attainment gap” activities.   
16

Page 17

Community Wealth Building 
4.7 Better educational outcomes for children young people and adults, as well as increased
capacity building and resilience in communities are required to underpin a strong local
economy. North Ayrshire works in partnership with local early learning and childcare
providers (local businesses) to ensure the provision of care is a shared endeavour. 
5. Consultation 
5.1 There has been no specific consultation on the contents of this report. 
Audrey Sutton
Executive Director 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294 324413. 
Background Papers
0
17

Page 18

1   |    Ardeer Primary School and Nursery Class, North Ayrshire Council, 8214123 © Crown Copyright
7 March 2023
Dear Parent/Carer
In December 2022, a team of inspectors from Education Scotland visited Ardeer Primary School
and Nursery Class. During our visit, we talked to parents/carers and children and worked
closely with the headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The effective teamwork across the school and nursery to support all children to achieve
the best possible outcomes in their learning.
• The highly effective use of data to inform planning and measure the effectiveness of
the strategies used to raise attainment in literacy and numeracy.
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council.
• Continue to support children across the school to become more independent in their
learning by providing more experiences that promote curiosity, independence, and
confidence.
• Review the process used to plan learning across the school to enable staff to develop
further creative teaching approaches.
Appendix 1
18

Page 19

2   |    Ardeer Primary School and Nursery Class, North Ayrshire Council, 8214123 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?. Quality
indicators help schools, local authorities and inspectors to judge what is working well and what
needs to be improved. Following the inspection of each school, the Scottish Government
gathers details of our evaluations to keep track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Ardeer Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Pamela Adamson
HM Inspector
19

Page 20

1   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
28 March 2023
Dear Parent/Carer 
In January 2023, a team of inspectors from Education Scotland visited Beith Primary School
and Nursery Class. During our visit, we talked to parents/carers and children and worked
closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work.
• Positive relationships are a strength of the school and nursery. Staff’s passion for and
commitment to children’s rights and wellbeing underpins their work. This is leading to
children who are confident, secure and happy in the school and nursery.
• The headteacher demonstrates strong and strategic leadership. She has created a
climate of continuous improvement which is developing leadership at all levels. 
• Teachers and practitioners have a strong collegiate approach to professional learning.
They work well together to improve children’s experiences which ensures children are
motivated and eager to learn.
• Senior leaders’ and staff’s effective use of data allows them to identify and plan the
correct interventions for children. They deliver well-planned support which is helping
children to experience success. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• In the nursery, continue to develop approaches to support children to talk about their
wellbeing through the focus on children’s rights. This will support the planned work on
improving children’s opportunities to explore diversity.
• In the school, as planned, continue to develop approaches to assess children's learning
and track their progress across all curricular areas.
• In the school and nursery, continue to help children to identify and talk about the skills
they are developing through the range of experiences they take part in. 
20

Page 21

2   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Beith Primary School
and Nursery Class 
Quality indicators for the primary stages Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion very good
Securing children’s progress very good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: 
Reports page | Inspection reports | Education Scotland
21

Page 22

3   |   Beith Primary School and Nursery Class, North Ayrshire Council, 8210829 © Crown Copyright
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Gillian Frew
HM Inspector 
22

Page 23

25 April 2023
Dear Parent/Carer
In February 2023, a team of inspectors from Education Scotland visited Greenwood
Academy. During our visit, we talked to parents/carers and young people and worked closely
with the headteacher and staff.
The inspection team found the following strengths in the school’s work.
• The leadership of the headteacher, supported by the leadership team have worked well
with staff to bring a sharper focus to school improvement and professional learning.
• Approaches to monitoring and tracking young people’s progress are used well to inform
school based interventions. The extended leadership team and staff are working well
together to drive forward school improvement, share practice and initiate change.
• Strong partnership working with the local college and local business is impacting
positively on learners’ experiences, supporting strong levels of personal development and
valuable qualifications.
• A strengthened focus on literacy and numeracy is leading to improved attainment for
young people throughout the school.
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• More consistently high expectations of all young people and high-quality learning
experiences are required across the school to support, motivate and engage young
people.
• Continue to work together with young people, parents and staff to promote positive
relationships across the school. The school should also review their approaches to
wellbeing, equality and inclusion to ensure that all young people feel valued, included and
respected in the life and work of the school.
• Improve the quality of passes in National Qualifications and support more young people to
be ambitious and to achieve qualifications at the highest level.
1 | Greenwood Academy, North Ayrshire Council, 8215030 © Crown Copyright
23

Page 24

Here are Education Scotland’s  evaluations for Greenwood Academy 
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing.
Quality indicators Evaluation
Leadership of change good
Learning, teaching and assessment satisfactory
Ensuring wellbeing, equality and inclusion satisfactory
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools.
Teri McIntosh
HM Inspector
2 | Greenwood Academy, North Ayrshire Council, 8215030 © Crown Copyright
24

Page 25

1   |   Auchenharvie Academy, North Ayrshire Council, 8216134 © Crown Copyright 
9 May 2023 
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Auchenharvie
Academy. During our visit, we talked to parents/carers and young people and worked
closely with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
 The headteacher, senior leaders and staff have very successfully developed and maintained
a supportive, safe and positive environment for learning. Young people are eager
participants in their learning and demonstrate high levels of engagement. 
 Staff have a very strong understanding of the needs of all young people in their community.
They promote equity successfully by having high aspirations for all young people. This has
resulted in nearly all young people moving on to positive destinations, such as university,
college or work. 
 Young people are very aware of the skills they are developing and are well motivated to
learn across different contexts.   
 The headteacher and senior leaders have led effectively a positive and sustained approach
to improving the attainment and achievements for all young people. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
 Senior leaders and staff should continue to work together to increase further the consistency
of high-quality learning and teaching across the school. 
 Teachers should improve further their approaches to meeting the learning needs of all young
people, including the most able. 
25

Page 26

2   |   Auchenharvie Academy, North Ayrshire Council, 8216134 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Auchenharvie Academy 
Quality indicators Evaluation
Learning, teaching and assessment very good
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale. 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Stuart Cathro
HM Inspector
26

Page 27

1   |   Glebe Primary School, North Ayrshire Council, 8211922 © Crown Copyright
16 May 2023
Dear Parent/Carer 
In February 2023, a team of inspectors from Education Scotland visited Glebe Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
headteacher and staff.  
The inspection team found the following strengths in the school’s work.
• The outstanding leadership of the headteacher in driving forward improvement. She has
developed successfully an aspirational learning community. She empowers children and
staff to lead and make genuine and valuable contributions to the life of the school and
beyond. 
• The significant impact of approaches to nurture, promoting positive relationships and
improving wellbeing. This results in a highly supportive and inclusive learning environment
where children thrive.
• Articulate children who are motivated, resilient and keen to do their very best. They are
confident, responsible and respectful, showing kindness, care and understanding towards
each other. 
• The very strong approaches of all staff to meeting the needs of children who face barriers
to their learning. Led very effectively by the depute headteacher, all staff are highly
responsive to the needs and changing circumstances of children and their families. 
• The commitment and dedication of all staff in ensuring all children benefit from a broad
range of quality learning experiences. This results in very strong attainment and high
achievement for children. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from North Ayrshire Council.
• Continue to take forward priorities for improvement, including promoting creativity and
innovation in learning, as planned. 
27

Page 28

2   |   Glebe Primary School, North Ayrshire Council, 8211922 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Glebe Primary School 
Quality indicators Evaluation
Leadership of change  very good
Learning, teaching and assessment very good
Ensuring wellbeing, equality and inclusion excellent
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Susie Smith
HM Inspector
28

Page 29

1   |    Skelmorlie Primary School, North Ayrshire Council, 8213925 © Crown Copyright
16 May 2023
Dear Parent/Carer 
In March 2023, a team of inspectors from Education Scotland visited Skelmorlie Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• Children who are confident, articulate and proud of their school. They experience
positive relationships with all staff and their peers. 
• The effective teamwork across the school to plan and deliver targeted support. All staff
work well together to support children with barriers to their learning. Children are well
supported in class and make good progress. 
• Children benefit from learning in a range of motivating learning spaces and through
increasingly relevant contexts. This supports children well to understand how their
learning in the classroom links to their life beyond school. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council 
• Continue to develop approaches to planning learning across the curriculum. Ensure all
learning builds on what children already know and is appropriately challenging. 
• Continue to develop approaches to tracking and monitoring children’s progress and
attainment. Ensure all staff use tracking information effectively to identify next steps in
learning for all children. 
29

Page 30

2   |    Skelmorlie Primary School, North Ayrshire Council, 8213925 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Skelmorlie Primary
School 
Quality indicators Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Marion Carlton
HM Inspector 
30

Page 31

1   |    Corrie Primary School and Nursery Class, North Ayrshire Council, 8200327 © Crown Copyright
29 August 2023
Dear Parent/Carer
In May 2023, a team of inspectors from Education Scotland visited Corrie Primary School and
Nursery Class. During our visit, we talked to parents/carers and children and worked closely
with the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• The headteacher has created a positive, nurturing and inclusive culture with a strong sense
of belonging across the school and nursery. Staff support children well which is resulting in
children who are motivated, engaged and confident in their learning. 
• In the nursery, the quality of the environments and learning experiences support children
well to make choices and to lead their play. 
• In the school, teachers plan well activities and experiences that meet the needs of all
children. This results in children making good progress in reading, listening and talking and
numeracy. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• In the nursery, develop further approaches to planning and assessing children’s learning to
increase levels of challenge. This should support children to make the best possible
progress. 
• In the school, teachers should continue to improve children’s progress in writing. They
should plan more regular learning opportunities for children to write at length and apply skills
to a wider range of contexts and audiences. 
31

Page 32

2   |    Corrie Primary School and Nursery Class, North Ayrshire Council, 8200327 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?. Quality
indicators help schools, local authorities and inspectors to judge what is working well and what
needs to be improved. Following the inspection of each school, the Scottish Government
gathers details of our evaluations to keep track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Corrie Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Gillian Frew
HM Inspector 
32

Page 33

1   |    Shiskine Primary School and Nursery Class, North Ayrshire Council, 8200629 © Crown Copyright
29 August 2023
Dear Parent/Carer
In May 2023, a team of inspectors from Education Scotland visited Shiskine Primary School and
Nursery Class. During our visit, we talked to parents/carers and children and worked closely
with the headteacher and staff.
The inspection team found the following strengths in the school’s work. 
• The headteacher has successfully created a professional culture where all staff learn
together to improve outcomes for children. Across the school and nursery, all staff work
very well together as a committed team. 
• The wide range of interesting experiences that children enjoy within the school, nursery
and in the community. These are developing children’s confidence and social skills
successfully. 
• The very positive, nurturing relationships between adults and children across the
school and nursery. Children are confident, engaged and enthusiastic learners who are
proud of their school community. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from North Ayrshire Council. 
• Continue to improve approaches to assessing and tracking children’s progress and
achievement in the school and nursery. 
• As planned, continue to develop approaches to planning, learning and teaching across all
curricular areas in the school and nursery. This should ensure that all children, including
those requiring additional support, receive the right level of support and challenge in their
learning.  
33

Page 34

2   |    Shiskine Primary School and Nursery Class, North Ayrshire Council, 8200629 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition) and How good is our early learning and childcare?.
Quality indicators help schools, local authorities and inspectors to judge what is working well
and what needs to be improved. Following the inspection of each school, the Scottish
Government gathers details of our evaluations to keep track of how well Scottish schools are
doing. 
Here are Education Scotland’s evaluations for Shiskine Primary School
and Nursery Class 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
Quality indicators for the nursery class Evaluation
Learning, teaching and assessment good
Securing children’s progress good
Descriptions of the evaluations are available from:
How good is our early learning and childcare? Appendix 1: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
https://education.gov.scot/inspection-and-review/find-an-inspection-report/find-an-inspection-
report/details?id=4351 
What happens next?
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. North Ayrshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Helen Mulholland
HM Inspector
34

Page 35

How good is our school?
Appendix 3: The six-point scale
The six-point scale is a tool for grading the quality indicators. It is mainly used
by Education Scotland, local authorities and other governing bodies for the
purpose of national and/or local benchmarking across a number of establishments.
It is not necessary for individual schools to measure themselves against the
six-point scale although they may choose to do so. It should be noted that, when
a grading is applied, it is for the whole quality indicator. Individual themes
should not be graded. In education, an evaluation can be arrived at in a range
of contexts. We need to bear in mind that awarding levels using a quality scale
will always be more of a professional skill than a technical process. However,
the following general guidelines should be consistently applied.
Excellent An evaluation of excellent means that this aspect of the school’s work
is outstanding and sector-leading. The experiences and achievements
of all children and young people are of a very high quality. An evaluation
of excellent represents an outstanding standard of provision which
exemplifies very best practice, based on achieving equity and inclusion
and a deep professional understanding which is being shared beyond
the school to support system-wide improvement. It implies that very
high levels of performance are sustainable and will be maintained.
Very good An evaluation of very good means that there are major strengths in
this aspect of the school’s work. There are very few areas for
improvement and any that do exist do not significantly diminish
learners’ experiences. An evaluation of very good represents a high
standard of provision for all children and young people and is a
standard that should be achievable by all. There is an expectation that
the school will make continued use of self-evaluation to plan further
improvements and will work towards improving provision and
performance to excellent.
Good An evaluation of good means that there are important strengths within
the school’s work yet there remains some aspects which require
improvement. The strengths have a significantly positive impact on
almost all children and young people. The quality of learners’
experiences is diminished in some way by aspects in which
improvement is required. It implies that the school should seek to
improve further the areas of important strength, and also take action to
address the areas for improvement.
Satisfactory An evaluation of satisfactory means that the strengths within this
aspect of the school’s work just outweigh the weaknesses. It indicates
that learners have access to a basic level of provision. It represents a
standard where the strengths have a positive impact on learners’
experiences. While the weaknesses are not important enough to have
a substantially adverse impact, they do constrain the overall quality of
learners’ experiences. The school needs to take action to address
areas of weakness by building on its strengths.
Weak An evaluation of weak means that there are important weaknesses
within this aspect of the school’s work. While there may be some
strength, the important weaknesses, either individually or collectively,
are sufficient to diminish learners’ experiences in substantial ways. It
implies the need for prompt, structured and planned action on the part
of the school.
Unsatisfactory An evaluation of unsatisfactory means there are major weaknesses
within this aspect of the school’s work which require immediate
remedial action. Learners’ experiences are at risk in significant
respects. In almost all cases, this will require support from senior
managers in planning and carrying out the necessary actions to effect
improvement. This will usually involve working alongside staff in other
schools or agencies.
62 6335

Page 36

36

Page 37

NORTH AYRSHIRE COUNCIL 
25 January 2024   
Audit and Scrutiny Committee 
Title:    Education Authority Annual Plan 2023-24 
Purpose:  To inform the committee about the content of the statutory annual
Education Authority Annual Plan for 2023-24. 
Recommendation:  That the committee:
(a) Notes the content of the Education Authority Annual Plan for
2023-24 and its publication as required by the Education
(Scotland) Act 2016. 
1. Executive Summary 
1.1 The Education Authority Annual Plan sets out how North Ayrshire Council will deliver
the strategic priorities of the National Improvement Framework. In addition, the plan
sets out the expected educational benefits of the improvement activities and how
success will be measured. 
1.2 The Education Authority Annual Plan primarily aligns with the Council Plan 2023-28
strategic aim to “transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people” and more specifically operationalises activities to improve
educational attainment and achievement and reduce the attainment gap. This plan
outlines an ambitious programme for how the Education Service will deliver better
outcomes for children, young people, and communities in North Ayrshire. 
2. Background 
2.1 The Education (Scotland) Act 2016, which amended the Standards in Scotland’s
Schools Act 2000, introduced the National Improvement Framework (NIF) for education
and includes a requirement on education authorities to produce annual plans and
reports in pursuance of the National Improvement Framework priorities. Annual plans
and reports should demonstrate progress and set out expected education benefits as
well as how success will be measured. 
2.2 The National Improvement Framework for Scottish Education 2023 was published in
December 2022 and set out the Scottish Government’s vision for Scotland’s children 
and young people’s progress in learning through excellence and equity. All schools and
education authorities have developed annual plans which focus on delivering: 
Agenda Item 4
37

Page 38

2.2.1 Excellence through raising attainment and improving outcomes: ensuring that
every child and young person achieves the highest standards in literacy and
numeracy, as well as the values, attitudes, knowledge, and skills necessary to
shape a sustainable future as successful learners, confident individuals,
responsible citizens, and effective contributors; and 
2.2.2 Achieving equity: ensuring every child and young person has the same
opportunity to succeed, no matter their background or shared protected
characteristics, with a particular focus on closing the poverty related attainment
gap. 
2.3 The key priorities set out in the National Improvement Framework for 2023 are: 
• Placing the human rights and needs of every child and young person at the centre
of education;
• Improvement in children and young people’s health and wellbeing;
• Closing the attainment gap between the most and least disadvantaged children and
young people;
• Improvement in skills and sustained, positive school-leaver destinations for all young
people; and
• Improvement in attainment, particularly in literacy and numeracy. 
2.4 The draft Education Authority annual plan for 2023-24, attached at Appendix 1, aligns
both to the national improvement priorities and sets these in the context of North
Ayrshire Council Plan 2023-28 strategic aim to “transition to a wellbeing economy,
delivering prosperity, wellbeing and resilience for local people.” 
2.5 In particular, this annual plan will operationalise and support the Council Plan activities
linked to “improving educational attainment and achievement and closing the attainment
gap.” 
2.6 This plan also aligns with North Ayrshire Children’s Service’s Plan and is underpinned
by transformation activity within the Education Service, undertaken through the Scottish
Attainment Challenge, Supporting Needs, and Expansion of Early Learning and
Childcare, to improve outcomes for children and young people. 
2.7 This plan contains stretch aims which articulate the service’s ambition to improve a
range of learner outcomes by 2026. The requirement to include three-year stretch aims
within this plan was introduced by Scottish Government in its updated Framework for
Recovery and Accelerating Progress, published in May 2023. 
2.8 Once approved, the education authority annual plan must be published. A copy has also
been sent to Scottish Ministers for reference. 
3. Proposals 
3.1 It is proposed that the committee: 
(a) Notes the content of the Education Authority Annual Plan for 2023-24 and its
publication as required by the Education (Scotland) Act 2016. 
38

Page 39

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 The production of an Education Authority annual plan is a requirement under the 
Education (Scotland) Act 2016. 
Equality/Socio-economic 
4.4 The Education Authority annual plan sets out specific improvement actions designed to 
improve educational outcomes for all, and also to reduce the impact of poverty on 
educational attainment. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This Service Plan aligns with the Council Plan 2023-28 strategic aim to “transition to a
wellbeing economy, delivering prosperity, wellbeing and resilience for local people” and
more specifically “improving educational attainment and achievement and closing the
attainment gap” activities.   
Community Wealth Building 
4.7 North Ayrshire’s Education Authority Annual Plan supports North Ayrshire’s Community
Wealth Building aspirations through providing high quality skilled workers who can
contribute to the local economy. In addition, initiatives outlined in the Education
Authority Annual Plan provide a wealth of opportunities for local businesses and people
seeking employment in North Ayrshire. 
5. Consultation 
5.1 The content of the Education Authority annual plan for 2023-24 has been agreed across 
the education service following rigorous self-evaluation in schools and across the
service of the progress towards the previous year’s plan. The process of arriving at the
service level priorities and strategic actions included engagement of Head Teacher and
the service leadership team. At school level, priorities are identified through
engagement with pupils, staff, parents/carers and key partners. 
39

Page 40

Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Andrew McClelland, Head of Service (Education),
on 01294324413. 
Background Papers
1 – Appendix 1
40

Page 41

North Ayrshire Council
Education
Service
Improvement
Plan
2023-26
Includes Action Plan for 2023-24
41

Page 42

2 North Ayrshire Council
42

Page 43

Contents
Introduction 2
The National context 4
The Local context 5
Improving as a Service 9
North Ayrshire Council Education 
Service Improvement Plan 2023-26 10
Improving outcomes for learners – 
our stretch aims 12
Priority 1 16
Priority 2 18
Priority 3 20
Priority 4 22
Priority 5 24
Strategic support: Ensuring excellent 
educational experiences 26
43

Page 44

Andrew McClelland
Head of Service (Education)
Introduction
2 North Ayrshire Council
We have no poverty of
expectation, opportunity or
aspiration for our children,
young people and their families.
As a result, our over-riding
aim is to improve the educational
outcomes for all learners,
particularly those most
disadvantaged learners.
In almost all aspects of learning there
has been a consistent improving trend
of achievement across the last decade in
North Ayrshire. Throughout, our schools and
early learning and childcare settings have
had a clear focus on raising attainment and
reducing the poverty-related attainment
gap, in line with local and national
priorities. Nevertheless, the arrival of the
coronavirus pandemic in 2020 brought with
it significant challenges for our families
and communities. National lockdowns,
interrupted learning and significant changes
in personal circumstances have impacted on
the outcomes achieved by our children and
young people.
To mitigate this, we diverted significant
resources. We invested in supporting our
children and young people and maintaining
a determination to make further progress in
achievement for all learners. I am pleased
to report that we are beginning to see the
recovery take effect, with improvements in a
range of areas last session.
As part of our ongoing process of self-
evaluation, we have scrutinised how well we
are doing as a service in supporting recovery
and further improvement and we have used
this evidence to shape the content of this
Education Service Improvement Plan for
2023-26. You will read in the forthcoming
pages our priorities for the next three
years, which are aligned to North Ayrshire’s
Council Plan and the National Improvement
Framework for Education. This document
gives an overview of our priorities for the
next three years and also summarises what
we will do specifically in session 2023-24,
what we aim to improve and how we will
measure success.
44

Page 45

This plan is ambitious yet achievable
for our children and young people. We
are confident that outcomes for our
learners will continue throughout the
life of this three-year plan and beyond.
To demonstrate our sustained aspirations
for and commitment to the children and
young people we serve, we have included
stretch aims for improvement over the next
three years.
All educational establishments have created
their own improvement plans, aligned to
the broad priorities and themes within this
plan, and tailored to the individual contexts
and needs of learners in each school
community. These plans are available from
individual establishments and are accessible
electronically on their websites.
This plan builds on the excellent teamwork
across our directorate. It reaffirms our
commitment to continuous improvement
and to delivering for the children and young
people of North Ayrshire.
We are confident that outcomes
for our learners will continue
throughout the life of this
three-year plan and beyond.
To demonstrate our sustained
aspirations for and commitment
to the children and young
people we serve, we have included
stretch aims for improvement
over the next three years.
Education Service Improvement Plan 2023-26 3
45

Page 46

The National Context
This plan is aligned to the priorities of the 2023 National Improvement Framework (NIF)
and is designed to deliver the dual aims of excellence and equity in education for North
Ayrshire’s children and young people. Our five priorities for the three years from 2023-26
are as follows:
National 
Improvement
Framework Priorities
Improvement 
in attainment,
particularly in literacy
and numeracy
Closing the
attainment gap
between the most and
least disadvantaged
children and
young people.
Improvement 
in skills 
and sustained,
positive school-leaver
destinations 
for all young 
people.
Improvement 
in children and young
people’s health
and wellbeing.
Placing human 
rights and needs of
every child and young
person at the centre 
of education.
In the creation of this plan, we have built on a robust evaluation of our local context and
the progress we have made to date in the improvement of educational outcomes for young
people. We have taken account of a range of key national drivers of change which will
affect education provision in North Ayrshire, including:
● The current national programme of
educational reform
● The ongoing national review of the
curriculum
● The ongoing national review
of supporting needs
● The priorities and drivers of the National
Improvement Framework
● The refreshed Attainment Scotland Fund
● The national Child Poverty Delivery Plan
● The ongoing work to embed the articles of
the UNCRC
● The Promise and its associated delivery plan
● Revised Child Protection Guidelines
● The national Mental Health and Wellbeing
Strategy
4 North Ayrshire Council
46

Page 47

The Local Context
The Education Service in North Ayrshire Council is responsible for the education of
18,061 pupils across the authority’s primary, secondary and additional support needs
schools. A further 2,064 children attend early learning and childcare settings in
North Ayrshire.
46% of our Children
and young people live in
postcodes in the most
deprived areas of Scotland
according to SIMD.
29% of our Children and
young people are living in
relative poverty, according to
UK government statistics.
6,135 of our Children and
young people are registered
for school footwear and
clothing grants.
Education Service Improvement Plan 2023-26 5
47

Page 48

Council Priorities
North Ayrshire Council’s current priorities are:
Wellbeing
Communities
and Local
Democracy
Climate Change
A
Sustainable
Council
To transition to a
wellbeing economy,
delivering prosperity,
wellbeing and resilience
for local people.
We will have active,
inclusive and resilient
communities.
To achieve net-zero
by 2030.
A community wealth
building council that is
efficient and accessible,
maximising investment
and focusing resources
towards our priorities.
6 North Ayrshire Council
48

Page 49

The education service is part of North Ayrshire Council’s Communities and Education
Directorate, which works towards developing a society where everyone, has the same life
chances to grow, prosper and have fulfilling and healthy lives. The education service has a
central role in removing barriers and supporting delivery of the priority outcome to ensure
North Ayrshire’s children and young people have the best start in life.
Education in North Ayrshire is delivered through:
48
Primary Schools 14
Partnership early learning
and childcare settings
8
Secondary Schools 17,691
Pupils
1
Through School 1,434
Teachers
1
Specialist ASN Campus
387
Early learning and 
childcare staff
41
Council-managed early 
learning and 
childcare settings 12,700
Support staff hours
This plan should be read in the context of these associated local plans:
North Ayrshire Council
Plan 2019-24
North Ayrshire Children
Services Plan 2020/2023
North Ayrshire Child Poverty
Report 2021-22 and Action
Plan 2022-23
SWEIC – Regional
Improvement Plan 2022-23
Education Service Improvement Plan 2023-26 7
49

Page 50

8 North Ayrshire Council
50

Page 51

Improving as a Service
Our commitment to continuous improvement permeates the work of the service. Our
establishments work very closely together with each other and our central team in a culture
of positive support and challenge. Our overarching approach can be summarised as follows:
We strive to be a learning organisation.
We support the principles of subsidiarity and empowerment of
our head teachers and school communities.
We evaluate the impact of the central education team
in supporting consistency of improvement across our
educational establishments.
We work closely in partnership with colleagues across our
Regional Improvement Collaborative and nationally.
We are investing in the quality of our teachers, practitioners
and support staff.
We are investing in our learning environments to ensure they
maximise opportunities for engagement and achievement
for all.
We are developing the leaders of tomorrow through our
innovative leadership and facilitation programmes.
9Education Service Improvement Plan 2022-23
51

Page 52

North Ayrshire Council Education
Service Improvement Plan 2023-26
For the three years from 2023-26, the NAC Education Service Improvement Plan will focus
on a stable and consistent set of priorities. Under each of the five priorities, we will undertake
improvement activities grouped together under key themes. These will remain consistent
across the three years. Each academic year, we will update the specific actions we will take
forward during that school year in pursuit of these priorities.
The high-level priorities and themes of our Education Service Improvement Plan for 2023-26
are as follows:
PRIORITY 01
Improvement in attainment,
particularly in literacy and
numeracy.
THEMES:
• High quality learning,
teaching and assessment
• Raising attainment and
achievement
PRIORITY 02
Closing the attainment gap
between the most and least
disadvantaged children and
young people.
THEMES:
• Interventions to
reduce gaps
• Specific focus on
identified target
groups, including care
experienced learners
PRIORITY 03
Improvement in skills and
sustained, positive school-
leaver destinations for all
young people.
THEMES:
• Improving skills
• Partnerships to improve
post-school learner
outcomes
PRIORITY 04
Improvement in children
and young people’s health
and wellbeing.
THEMES:
• Improving attendance
• Supporting mental health
and wellbeing
• Supporting physical
health and wellbeing
• Supporting social and
emotional wellbeing
PRIORITY 05
Placing human rights and
needs of every child and
young person at the centre
of education.
THEMES:
• Supporting
children’s needs
• Maximising learner voice
and participation
• Maximising parent/
carer involvement and
engagement
The work of the Service
Improvement Plan will be
enhanced through a focus on
STRATEGIC SUPPORT themes
as follows:
• Policies and operating
procedures
• Creating inspiring learning
environments
• Investing in leadership
• Workforce planning
10 North Ayrshire Council Education Service Improvement Plan 2023-26 11
52

Page 53

Improving outcomes for learners – our stretch aims
Below are the key core outcomes for learners we are working to improve by 2026, based 
on the most recently available cohort and performance information.
CORE OUTCOMES FOR IMPROVEMENT Performance up to 2023 Stretch Aim 
(by August
2026)
Actual Progress Summary 
(updated annually)
Description of improvement Performance
Measure
2019 2020 2021 2022 2023 2024 2025 2026
Core Stretch Aim 1
The proportion of learners in North Ayrshire who
achieve the expected levels of attainment in literacy 
at P1, P4 and P7 will increase.
All learners 74% n/a 59% 67% 68% 75% – – –
Q1 67% n/a 49% 60% 63% 72% – – –
Q2-5 79% n/a 67% 74% 74% 80% – – –
Gap 1 (Q1 vv Q2-5) -12pp n/a -18pp -14pp -11pp -8pp – – –
Core Stretch Aim 2
The proportion of learners in North Ayrshire who
achieve the expected levels of attainment in numeracy
at P1, P4 and P7 will increase.
All learners 79% n/a 67% 75% 76% 81% – – –
Q1 74% n/a 58% 69% 71% 78% – – –
Q2-5 84% n/a 75% 81% 80% 86% – – –
Gap 1 (Q1 vv Q2-5) -10pp n/a -17pp -12pp -9pp -8pp – – –
Core Stretch Aim 3
The proportion of school leavers who achieve 1 or
more awards at SCQF level 5 or better will increase.
All learners 87% 86% 90% 89% n/a 92% – – –
Q1 80% 79% 83% 82% n/a 89% – – –
Q2-5 93% 92% 95% 93% n/a 95% – – –
Gap 1 (Q1 vv Q2-5) -13pp -13pp -12pp -11pp n/a -6pp – – –
Core Stretch Aim 4
The proportion of school leavers who achieve 1 or
more passes at SCQF level 6 (grades A-C) or better 
will increase.
All learners 65% 67% 71% 68% n/a 74% – – –
Q1 52% 55% 61% 56% n/a 62% – – –
Q2-5 75% 76% 78% 77% n/a 80% – – –
Gap 1 (Q1 vv Q2-5) -23pp -21pp -17pp -21pp n/a -18pp – – –
Core Stretch Aim 5
The proportion of 16-19 year-olds who are
participating in education, employment or training 
will increase.
All learners 90.5% 90.6% 90.1% 90.8% 93.9% 95% – – –
Q1 87.8% 86.9% 85.3% 88.0% 90.6% 92.5% – – –
Q2-5 92.4% 93.5% 93.9% 93.0% 96.2% 97.5% – – –
Gap 1 (Q1 vv Q2-5) -4.6pp -6.6pp -8.6pp -5pp -5.6pp -5pp – – –
Core Stretch Aim 6
School attendance levels will increase.
All learners 92.1% 91.6% 91.4% 89.4% 88.8% 93% – – –
Q1 90.7% 90.1% 89.9% 87.7% 86.7% 92% – – –
Q2-5 93.2% 92.8% 92.8% 90.8% 90.5% 94% – – –
Gap 1 (Q1 vv Q2-5) -2.5pp -2.7pp -2.9pp -3.1pp -3.8pp -2pp – – –
12 North Ayrshire Council Education Service Improvement Plan 2023-26 13
53

Page 54

Improving outcomes for learners – our stretch aims (cont.)
Below are the additional outcomes for learners we are working to improve by 2026.
ADDITIONAL OUTCOMES FOR IMPROVEMENT Performance up to 2023 Stretch Aim 
(by August
2026)
Actual Progress Summary 
(updated annually)
Description of improvement Performance
Measure
2019 2020 2021 2022 2023 2024 2025 2026
Additional Stretch Aim 1
The proportion of children achieving local early
learning milestones by the start of P1 will increase.
All learners 78.2% n/a 72.0% 78.5% 81.4% 83% – – –
Q1 75.3% n/a 61.8% 75.6% 75.1% 79.5% – – –
Q2-5 80.7% n/a 80.8% 81.4% 86.8% 86% – – –
Gap 1 (Q1 vv Q2-5) -5.4pp n/a -19pp -5.8pp -11.7pp -6.5pp – – –
Additional Stretch Aim 2
The proportion of school leavers achieving literacy at
SCQF Level 5 or better will increase.
All learners 83.8% 81.5% 85.0% 83.8% n/a 85.5% – – –
Q1 75.0% 73.3% 78.7% 76.4% n/a 79% – – –
Q2-5 90.8% 87.5% 90.0% 89.0% n/a 90.5% – – –
Gap 1 (Q1 vv Q2-5) -15.8pp -14.2pp -11.3pp -12.6pp n/a -11.5pp – – –
Additional Stretch Aim 3
The proportion of school leavers achieving numeracy
at SCQF Level 5 or better will increase.
All learners 69.3% 70.8% 72.3% 71.4% n/a 74% – – –
Q1 58.5% 59.3% 64.0% 60.6% n/a 65% – – –
Q2-5 77.7% 79.1% 78.6% 79.1% n/a 81% – – –
Gap 1 (Q1 vv Q2-5) -19.1pp -19.8pp -14.6pp -18.5pp n/a -16pp – – –
Additional Stretch Aim 4
The average “complementary tariff score” of school
leavers’ best five qualifications will increase.
All learners 599 643 665 643 n/a 675 – – –
Q1 465 495 539 508 n/a 570 – – –
Q2-5 703 751 765 740 n/a 775 – – –
Gap 1 (Q1 vv Q2-5) -238pts -256pts -226pts -232pts n/a -205pts – – –
Additional Stretch Aim 5
The proportion of care experienced school leavers
who achieve 1 or more awards at SCQF levels 4, 5 and
6 will increase.
1+ Level 4 or better 84.7% 77.2% 86.1% 90.3% n/a 92.5% – – –
1+ Level 5 or better 50.6% 53.2% 62.4% 67.7% n/a 69.5% – – –
1+ Level 6 or better 27.1% 29.1% 40.6% 34.4% n/a 36.5% – – –
Additional Stretch Aim 6
The proportion of care experienced school leavers
who achieve literacy and numeracy qualifications at
SCQF levels 4 and 5 or better will increase.
Lit L4 or better 75.5% 74.4% 71.7% 81.6% n/a 84% – – –
Lit L5 or better 39.6% 53.9% 40.0% 51.0% n/a 55% – – –
Num L4 or better 64.2% 69.2% 55.0% 79.6% n/a 84% – – –
Num L5 or better 26.4% 38.5% 33.3% 32.7% n/a 45% – – –
14 North Ayrshire Council Education Service Improvement Plan 2023-26 15
54

Page 55

Appendix: Specific improvement actions for session 2023-24
Priority 1: Improvement in attainment, particularly 
in literacy and numeracy
Theme 1: High quality learning, teaching and assessment
What we will do What we aim to improve How we will measure success
Develop a partnership approach to our new model of professional learning to support improved quality
of learning and teaching in the classroom, and include additional investment in high quality professional
learning for support staff and early years practitioners.
Improve consistency and quality of learning,
teaching and assessment across all establishments.
Quality of learning, teaching and assessment
will be evaluated as good or better in all
establishments. (HGIOS 2.3/HGIOELC 2.3/QIF/
School Reviews)
Extend play pedagogy in the early stages of primary following a review of the pilot programme and
work in partnership to increase outdoor active play in primary school settings.
Improve the cognitive, physical, social, and
emotional well-being of children, and support the
development of early level skills required for study,
work and relationships.
The proportion of children achieving NAC early
learning milestones by the end of ELC and early
level by the end of P1 will increase.
(Milestones data/ACEL/stretch aim)
Review, update and implement authority-wide frameworks for learning to support high quality learning
and teaching across all schools and EYCs – including: Literacy; Outdoor learning/STEM; Early learning;
Health & Wellbeing
Improve consistency of quality and build on and
extend existing good practice.
Quality of learning, teaching and assessment
will be evaluated as good or better in all
establishments. (HGIOS 2.3/HGIOELC 2.3/QIF/
School Reviews)
Support establishments to achieve Digital Schools status, ensuring that digital technologies are a
central component of our approaches to quality learning and teaching.
Improve the effective use of digital technologies to
enhance learning in all establishments.
The number of schools achieving Digital Schools
status will increase. (Digital Schools award/QIF/
HGIOS 2.3, 3.3 HGIOELC 2.3, 3.3)
Theme 2: Raising attainment and achievement
What we will do What we aim to improve How we will measure success
Further enhance approaches to supporting and challenging schools/EYCs to make effective use of
performance data to plan for further improvements in attainment. This will be supported through the
development of new data visualisation resources.
Improve learner attainment and achievement at
all levels.
Raising attainment and achievement
will be evaluated as good or better in all
establishments. (HGIOS 3.2 HGIOELC 3.2/QIF)
The percentage of children and young
people achieving the expected Curriculum
for Excellence levels will increase (ACEL data)
(stretch aims)
The percentage of school leavers achieving
literacy and numeracy qualifications will
increase. (Insight national benchmarks L4,5,6)
The overall levels of achievement of school
leavers will increase. (Insight attainment for all
20/60/20)
Implement further target setting arrangements to raise attainment and achievement for all. Improve the quality of monitoring progress
in learning and the effective use of targeted
interventions.
Support primary schools to raise attainment in literacy through evidence-based improvement
approaches to developing aspects of listening and talking skills in the early stages of primary and
writing in the middle stages of primary.
Improve attainment levels in specific focus areas of
literacy across a range of establishments.
16 North Ayrshire Council Education Service Improvement Plan 2023-26 17
55

Page 56

Priority 2: Closing the attainment gap between the most and 
least disadvantaged children and young people
Theme 1: Interventions to reduce gaps
What we will do What we aim to improve How we will measure success
Increase coherence between SEF and PEF interventions and support schools to improve the impact of
PEF investments on target groups of learners.
Improve the effectiveness of targeted interventions
in reducing the attainment gap.
The gap between the achievement levels of
the most and least disadvantaged learners
will reduce. (ACEL data/Insight attainment vv
deprivation) (stretch aims)
With a specific focus on early learning, enhance the work of our Excellence and Equity Leads team to
support the further reduction of the poverty-related achievement gap.
Improve early years outcomes for all children,
particularly those most disadvantaged.
The gap between the early learning milestones
data of the most and least disadvantaged
learners will reduce.
(Milestones Data) (stretch aims)
Continue to work closely across North Ayrshire services and third sector partners to reduce the cost of
the school day and mitigate the impact of child poverty.
Improve the extent to which our schools and
Early Years centres can mitigate the impact of
child poverty.
The number of schools demonstrating a poverty
aware approach to mitigating the impact of child
poverty will increase. (QIF/COSD Toolkit evaluative
framework)
Theme 2: Specific focus on identified target groups, including care experienced learners
18 North Ayrshire Council Education Service Improvement Plan 2023-26 19
What we will do What we aim to improve How we will measure success
Continue to implement the strategic actions of the Promise, through:
•  further enhancing supports for care experienced children and young people, including mentoring 
services, that enable them to attain and achieve in line with their peers.
•  expanding MCR Pathways programme to involve all mainland secondary schools.
Improve the attendance, engagement and
achievement of care experienced children and
young people.
Attendance levels will improve and exclusion
levels will reduce for all care experienced
learners. (Seemis attendance/exclusion data)
Achievement levels will improve for care
experienced learners. (ACEL data/Insight average
complementary tariff scores)
The gap specifically between the achievement
levels of care experienced learners and all other
learners will reduce. (Milestone Data/ACEL data/
Insight average complementary tariff scores)
56

Page 57

Priority 3: Improvement in skills and sustained, positive
school-leaver destinations for all young people
Theme 1: Improved skills
What we will do What we aim to improve How we will measure success
Commence a review of the curriculum across secondary schools. Improve the shared understanding of the purpose
and design of the curriculum in order to increase
opportunities to maximise the successes and
achievements of all our learners.
The number and quality of successful student
presentations across all SCQF qualifications will
increase. (Insight breadth and depth/Insight average
complementary tariff scores)
Increase direct links within the curriculum to the Ayrshire Growth Deal and design further opportunities
for skills development in a range of contexts.
Improve the articulation between curriculum and
skills development through an increased knowledge
and understanding of the Ayrshire Growth Deal.
The number of secondary schools engaging with
Ayrshire College Innovation Bursts will increase.
(College participation data)
The senior phase curriculum offer will be
broadened to recognise the 5 key programmes
within the Ayrshire Growth Deal:
Aerospace and Space/Communities/Economic
Infrastructure/Energy, Circular Economy, and
Environment/Tourism
(Qualifications data)
Theme 2: Partnerships to improve learner outcomes post-school
What we will do What we aim to improve How we will measure success
Through DYW co-ordinators and other partners, embed approaches to planning, supporting and
tracking post-school destinations for all school leavers.
Improve the levels of sustained positive
destinations for our young people.
The proportion of young people entering and
sustaining positive destinations will increase.
(Insight positive destinations data)
Strengthen partnership work with the NAC Local Employability Partnership, Skills Development
Scotland and Ayrshire college to support sustained, positive participation in education, training or work
for all young people up to the age of 19.
Improve participation levels for all young
people up to the age of 19, through enhanced
partnership working.
The proportion of young people positively
participating in education, training or work will
increase. (Annual Participation Measure)
20 North Ayrshire Council Education Service Improvement Plan 2023-26 21
57

Page 58

Priority 4: Improvement in children and young people’s
health and wellbeing
Theme 1: Supporting mental health and wellbeing
What we will do What we aim to improve How we will measure success
Implement and evaluate the revised school counselling service across all schools. Improve the targeting of the counselling resource
to support the mental health & wellbeing needs of
identified learners.
Children/young people will report increased
engagement, satisfaction, and improved
wellbeing following counselling and access
to other wellbeing supports. (CORE/SDQ/ crisis
counselling measures)
Continue to embed whole school approaches to supporting children’s mental health and wellbeing,
ensuring integration with community mental health and wellbeing approaches.
Improve early access for children and families to a
wide range of high quality universal and targeted
activities that will support positive mental health
and wellbeing.
An increased number of children/young people
will report having their mental health and
wellbeing needs met. (Pupil Focus Groups, PASS,
LIAM Measures, CYP CMHWB Supports and Services
Reporting and Evaluations)
Support establishments to develop evidence-based staff wellbeing approaches around the key themes
of autonomy, agency and affiliation for staff.
Improve the range of supports available to staff to
support their mental health and wellbeing.
The proportion of staff reporting concerns
about their mental health and wellbeing 
will decrease. (OH reports/staff absence data 
staff survey)
Theme 2: Supporting social and emotional wellbeing
What we will do What we aim to improve How we will measure success
Establish whole school nurturing approaches in all establishments, including the designation of whole
school nurture leads, the implementation of a comprehensive training programme for staff and the
establishment of benchmarks to support self-evaluation and consistency of practice.
Improve the consistency of pupil experience of
whole school nurturing approaches through the
increased staff knowledge and application of these
approaches in practice.
Staff knowledge and confidence in applying
whole school nurture and relationship based
approaches will improve and pupil outcomes
will improve. (Nurture staff survey/QIF /QI3.1
evaluations/SDQ/Exclusion data)
Theme 3: Improving attendance
22 North Ayrshire Council Education Service Improvement Plan 2023-26 23
What we will do What we aim to improve How we will measure success
Develop further universal supports to ensure improved school attendance for all, including updated
processes and guidance.
Improve attendance through enhanced approaches
to monitoring and the creation of agreed
interventions to maximise engagement.
Attendance levels will improve, late coming
will reduce and exclusion levels will reduce for
all learners. (Seemis attendance/exclusion data/
PASS data)
Develop targeted approaches to support improved school attendance for individuals and identified
groups of children and young people, including care experienced learners.
Improve access to an increased range of approaches
and services to support better attendance.
Attendance levels will improve, late coming
will reduce and exclusion levels will reduce for
specific groups of learners, including those with
attendance of below 50%/between 80-90%.
(Seemis attendance/exclusion data/PASS data)
58

Page 59

Priority 5: Placing human rights and needs of every child
and young person at the centre of education
Theme 1: Supporting needs
What we will do What we aim to improve How we will measure success
Implement the recommendations of the Supporting Needs review including the review of governance,
processes and practices to support placements, and the revised Staged Intervention policy.
Improve systems and processes governing the
provision of support to learners.
The number of referrals to the inclusion group
seeking alternative provision will reduce.
(Inclusion Group data)
Establishment evaluations about various
aspects of the new processes/policies will be
positive. (internal data)
Working in partnership with other services, engage with children, young people and their families to
collaborate and co-create a communication strategy around how needs are supported in North Ayrshire.
Improve understanding among all stakeholders. Stakeholder evaluations will demonstrate
improved knowledge and increased satisfaction.
(Focus groups/surveys)
Review support services and teams, including outreach services, classroom assistants and teaching
support, and enhance professional learning programmes.
Improve the quality, interconnectedness and
flexibility of the support resources available to
support learners’ needs.
Learner outcomes data will improve (attainment
data/stretch aims/wellbeing data)
Staff evaluations will demonstrate improved skills.
Refresh and redesign advice and guidance around best practice in curriculum approaches which offer
flexible and bespoke learning experiences for young people.
Improve the flexibility of the secondary school
curriculum shaped around learner needs.
The number of requests for external curricular
provision will reduce. (IG data)
Theme 2: Maximising learner participation and voice
What we will do What we aim to improve How we will measure success
Complete and implement a new Learner Participation Policy and increase opportunities for children and
young people to play a meaningful role in shaping education and Council policy and practice.
Improve learner participation and voice in the four
arenas of participation.
Learners will participate more meaningfully in
all areas of school life. (QIF/HGIOURS/SI)
The Service Improvement Group for Learner
Participation will monitor and evaluate North
Ayrshire’s learner participation strategy.
Theme 3: Maximising parent/carer involvement and engagement
24 North Ayrshire Council Education Service Improvement Plan 2023-26 25
What we will do What we aim to improve How we will measure success
Implement locally the revised ‘Learning Together’ Scottish Government parental involvement
and engagement action plan and use the Strategic Framework for Parental Involvement, Parental
Engagement, Family Learning and Learning at home to evaluate and plan for next steps at school and
authority level.
Improve the range and quality of opportunities for
parental engagement and involvement.
Parent/carer evaluations of their opportunities
for involvement in decision making at school
level will increase. 
(PIE survey/HGIOS 2.7/HGIOURS 2.7)
Evaluation and feedback from families and
schools on a range of aspects of family learning
will improve. 
(FL data/school impact reports)
59

Page 60

Strategic support: Ensuring excellent educational experiences
Theme 1: Policies and operating procedures
What we will do What we aim to improve How we will measure success
Continue the programme to replace Standard Circulars with new Policies and
Operating Procedures.
Improve clarity of policy and consistency of
implementation across establishments, leading to
improved outcomes for schools and their children/
young people.
Policy and practice inconsistencies
will reduce. (QIF/complaint records)
Satisfaction levels will increase.
(Annual stakeholder surveys)
Theme 2: Creating inspiring learning environments
What we will do What we aim to improve How we will measure success
Ensure the efficient and effective delivery of the learning estate in terms of condition, suitability
and sufficiency through the delivery of key projects, including: Marress House Early Learning Centre;
replacement Moorpark Primary School; Ardrossan Community Campus; New Primary School for
Irvine East (Montgomerie Park); expansion of dining facilities at West Kilbride PS, Glebe PS, Loudoun-
Montgomery PS.
Improve learning environments to ensure we:
provide creative and engaging lifelong learning
and teaching opportunities; are environmentally
efficient; are digitally enabled; and meet the
needs of all current and future learners within
North Ayrshire.
The strategic objectives of each project
will be met. (Project objective measures/
stakeholder evaluation)
Theme 3: Investing in leadership
What we will do What we aim to improve How we will measure success
Design programmes to support the professional development of our staff – including phase 2 of the
New Heads Induction Programme, the embedding of the DHT professional learning networks, and the
partnership delivery of the SWEIC leadership development programme.
Improve the professional learning offer and
leadership development pipeline for leaders at
a range of levels across the system, leading to
strengthened leadership of our establishments.
The number of participants in masters level
learning will increase. The quality of leadership
in our establishments will be further enhanced.
(Into Headship participants/QI 1.3 evaluations/
applicants for leadership posts)
Theme 4: Workforce Planning
26 North Ayrshire Council Education Service Improvement Plan 2023-26 27
What we will do What we aim to improve How we will measure success
Support service redesign across various education teams to ensure the efficient and effective
deployment of resource to deliver high quality service.
Improve the service redesign process through
enhanced understanding of the service objective,
people and financial implications of proposals.
Service objectives will continue to be met
successfully within the policy and financial
context. (Budget monitoring/service self-
evaluation/workforce planning data)
60

Page 61

28 North Ayrshire Council
61

Page 62

62

Page 63

63

Page 64

64

Page 65

NORTH AYRSHIRE COUNCIL 
25 January 2024 
Audit & Scrutiny 
Title:    HMIe Progress Review of Community Learning and
Development 
Purpose:  To advise Audit and Scrutiny of the outcomes of the recent
Progress Review of Community Learning and Development by
HMIE 
Recommendation:  a) That the Committee notes the recent Progress Review
carried out by HMIE against the CLD Strategic Plan and the
positive feedback from this; and 
b) That the Committee approves the actions planned as a
result of the outcome of the review.
c) That the Committee notes progress review has been
presented at Cabinet in December 2023. 
1. Executive Summary 
1.1    Education Scotland HM Inspectors of Education (HMIE) evaluate and report on the quality of
Community Learning and Development (CLD) provision within local authorities, in line
with The Requirements for Community Learning and Development (Scotland) Regulations
2013 and associated guidance for local authorities. This is also in line with the evaluation and
reporting which HMIE carries out on other sectors of education provision, such as schools and
early years centres. 
HM Inspectors have developed interim arrangements for inspection from academic
year 2023-24 to support improvement and provide external assurance of the quality of
CLD provision in Scotland. 
HM Inspectors are undertaking progress visits (PVs) to local authorities, commencing
in September 2023. During PVs, HM Inspectors will take account of the extent to
which local authorities are fulfilling their statutory duties in relation to CLD. HM
Inspectors will evaluate the progress local authorities and their CLD partners are
making to improve the quality of provision and services. 
1.2 North Ayrshire was one of the earliest progress visits undertaken, with HM Inspectors
visiting in the week of 18th September 2023. The report on the findings of the visit was
published on 31st October. 
2. Background 
Agenda Item 5
65

Page 66

2.1 Between 2016 and 2019, HM Inspectors undertook inspections of CLD provision in all
32 local authorities in Scotland. A summary of the inspection findings was published in
January 2020. The report highlighted key strengths and aspects for improvement in
the leadership and delivery of CLD provision. In March 2020, HM Inspectors
recognised that local authorities and CLD partners faced challenges in adapting to the
pandemic. As a result, the routine programme of inspections of CLD planning and
delivery by local authorities was suspended. HM Inspectors have now resumed
external evaluation of CLD in autumn 2023. 
2.2 Progress Visits will help to provide an overview of the current quality and improvement
in CLD leadership and governance across Scotland. They will also inform any future
Scottish Government review of the CLD Regulations and Community Empowerment
legislation and the implementation of CLD national strategies. The findings will also
inform future approaches to inspection of CLD provision in Scotland. 
2.3 The visits evaluate the effectiveness of local authority CLD partnerships’ approach to
self-evaluation and planning for improvement, and consider progress made against
identified priorities in their CLD plans. As with previous inspections, the starting point
was the CLD plan and the local authority and partners’ self-evaluation. The focus was
on the following high-level questions: 
• How effective is the leadership of the local authority and their CLD partners in
outcomes? 
• How well does the performance of the local authority and their CLD partners
demonstrate positive impact? 
In answering these questions, a range of quality indicators from the CLD quality
framework: How good is our community learning and development? were used and
the HM Inspection team undertook a range of activities such as reviewing
documentation, meeting strategic leaders and holding focus groups with partners and
learners. 
Progress visits are not graded using the evaluative grade scale for full inspections;
however the inspection team makes an overall judgement on the progress that the
local authority and their partners are making with the CLD plan and produce a
statement of confidence. 
The progress visit to North Ayrshire took place in the week of 18th September. A wide
range of staff, partners and learners were involved in the activities which took place,
and we would like to thank them once again for their support and engagement. At the
end of the process the inspection team evaluated the progress locally as being of the
level of the highest statement of confidence used, namely “The local authority and
their CLD partners are making sufficient progress with their CLD plan and have the
capacity to continue to improve.” 
This is testament to the robust planning and governance processes within North
Ayrshire and the quality of delivery and evaluation undertaken by the Council and its
CLD partners. Key areas of positive progress were identified as being: 
• The value placed upon CLD across the CLS Partnership in North Ayrshire;
• Leadership of CLD in North Ayrshire: and 
• Clear links from the CLD Plan to the Council Plan and the LOIP;
66

Page 67

• A clear focus on inclusion and reducing barriers to participation;
• Effective support for learners, community activists and volunteers to gain skills that
match their aims and ambitions. 
In particular, the Modern Apprentice programme within Youth Services was
highlighted as an example of highly effective practice and we have been asked to
share this more widely as a case study, which is being developed for publication. 
The process and report highlighted adult learner voice as an area for further
development, and this is already being developed and will continue to be progressed.
The ongoing development of the use of data in planning and of building capacity within
colleagues to work with communities are the other areas of development identified.
This aligns with the work already underway to continue to embed locality planning and
delivery models working alongside communities within all parts of the Council and
Community Planning Partnership. Next steps will be to implement a participation
structure for adult learner voice, and to work with colleagues to support the ongoing
development of locality planning and community empowerment. 
The full report which has been published is attached as Appendix 1 for consideration. 
3. Proposals 
3.1 Committee is asked to: 
a) Note the recent Progress Review carried out by HMIE against the CLD Strategic
Plan and the positive feedback from this; and 
b) Approve the actions planned as a result of the outcome of the review. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 None 
Equality/Socio-economic 
4.4 The values base of CLD work includes valuing equality of both opportunity and
outcome, and challenging discriminatory practice. The work of NAC staff and partners
on the CLD plan helps to address inequalities across communities and empower them
to have their place within the design and delivery of services.  It helps to ensure
resources are targeted to those in most need and where they will make the greatest
impact on outcomes, while ensuring there is also a universal offer of learning
opportunities and activities.  Through working with communities and with partners, the
voices, needs and aspirations of the communities inform the operational delivery and
67

Page 68

targeting of resources. It is foreseeable that the escalating cost-of-living crisis will put
pressure on individuals and communities and work with the community larder network
and partners who provide energy, financial and mental health advice will intensify. The
delivery of the plan focuses on building capacity and optimising opportunities so that
efforts to address poverty and inequalities are strengthened. 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The activities contained within the CLD Strategic Plan 2021-2024 support the North
Ayrshire Council Plan strategic aims: 
• To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience
for local people.
• We will have active, inclusive and resilient communities.
• A Community Wealth Building Council that is efficient and accessible, maximising
investment and focusing resources towards our priorities. 
Community Wealth Building 
4.7 The activities contained within the CLD Strategic Plan 2021-2024 support the
following
pillars of community wealth building: 
• Creating volunteering and skills development opportunities;
• Sustaining local employment through skills development;
• Advancing community enterprises, such as food pantries, community centre
ownership and community sports clubs; and
• Advancing local ownership of underused land and buildings. 
5. Consultation 
5.1 No consultation was required for the purpose of this report. 
Audrey Sutton
Executive Director of Communities and Education 
For further information please contact Rhonda Leith, Head of Service (Connected
Communities), on 01294 324415. 
Background Papers
Appendix 1:  Community Learning and Development Progress Visit Report North Ayrshire
Council
68

Page 69

for Scotland’s learners with Scotland’s educators
do luchd-ionnsachaidh na h-Alba le luchd-foghlaim Alba 
Community Learning and Development
Progress Visit Report 
North Ayrshire Council 
31 October 2023 
69

Page 70

2   | Community Learning and Development Progress Visit Report - North Ayrshire Council  
© Crown Copyright 
1. Context 
HM Inspectors visited North Ayrshire Council to undertake a community learning and development
(CLD) progress visit during September 2023. During the visit, we talked to learners and community
representatives, CLD leaders, managers, staff, and volunteers, and other key stakeholders. HM
Inspectors evaluated the effectiveness of the local authority CLD partnerships’ approach to self-
evaluation and planning for improvement, and considered progress made against identified
priorities in their CLD plans. 
2. Findings from the progress visit 
How effective is the leadership of the local authority and their CLD partners in improving
outcomes? 
Areas of positive progress 
CLD practices and principles are embedded within the work of the North Ayrshire Council and
the Community Planning Partnership (CPP). CLD is highly valued. Leadership of CLD is
effective and supported by well-established reporting structures. The CLD plan reflects both
council and local outcome improvement plan priorities. Staff understand their role well in
delivering against CLD plan priorities. Shared aims and objectives are evident in partnership
groups such as Locality Planning Partnerships (LPPs) and work is driven by council, CPP and
local priorities. Senior leaders, the CLD service and partners have a clear commitment to
partnership working with the communities they serve. Young people and community
representatives are actively involved in a range of forums and meetings and their views are
influential in shaping priorities and action plans. Third sector and community representatives are
well represented across community planning structures and feel heard and valued. This
supports services to understand the needs of communities. LPPs drive the delivery of CLD at
area level, ensuring that services are responsive to locally identified need. 
Effective evaluation and planning structures are in place. These support a continued focus on
improvement at all levels. Council CLD staff review their progress against locality and North
Ayrshire priorities. Staff at all levels are trusted and are empowered to make decisions about
their work and undertake regular self-evaluation. This supports their capacity to reflect on their
practice and work towards strong outcomes for learners and communities. The range of
purposeful partnership groups, which include community members, supports the collective
capacity to improve outcomes. The strong partnership between CLD and education colleagues
is helping to embed the engagement and empowerment of young people in their education.
Increasingly, CLD partners are coming together to discuss the impact of their work. This is
helping to ensure resources are targeted appropriately on existing and emerging needs.
Community organisations value the regular and useful communication they have with, and
training provided by, CLD practitioners. CLD partners are effective in supporting the drawdown
of significant additional funding by organisations across the local authority. North Ayrshire
Council CLD has developed an effective ‘grow your own’ culture. This supports the service to
maintain staffing levels in order to continue improving outcomes. 
70

Page 71

3   | Community Learning and Development Progress Visit Report - North Ayrshire Council  
© Crown Copyright
Areas for development 
Community members are well represented on community planning structures. However, there is
scope to increase the role of community members in decision making about CLD planning at a
strategic level. There is a need for the council and its CLD and education partners to further
consider how adult learners can contribute to and influence CLD planning. Continuing to grow
and develop approaches to self-evaluation between partners would enable senior leaders to
better capture and understand the impact of CLD across North Ayrshire. Senior leaders are
aware of the risk of CLD practitioners being viewed as key to the delivery of most work with
communities. Senior leaders within the CPP and the council now need to consider how to grow
the capacity of all services to work with communities to improve sustainability. 
How well does the performance of the local authority and their CLD partners demonstrate
positive impact? 
Areas of positive progress 
Senior leaders, managers and partners use both demographic and performance data effectively
to inform the allocation of resources. For example, they identified unmet need in CLD provision
for older adults when developing their 2021-24 CLD plan. Since then, they have successfully
allocated and attracted funding to enhance this provision. Since the start of 2023, Discovery
Award groups have been developed across the local authority. Participants are increasing their
skills, contributing to their communities as volunteers, and building social networks. The CLD
service has a systematic approach to the gathering of performance data. CLD service staff are
supported well to undertake quarterly reviews of their individual work. These reviews help
practitioners to ensure their practice is based on what learners and community members need.
The high degree of trust between practitioners and organisations means partners are confident
to share data. Doing so supports them in deciding which services to take forward. 
CLD partners have a clear focus on inclusion and reducing barriers to participation. They work
together very effectively to support individuals and families who are experiencing additional
challenges, to progress and achieve. The Additional Support Needs youth group helps young
people with a range of abilities and neurodiversity to socialise and develop communication and
life skills. New Scots enjoy meeting, sharing food, and developing language skills together at the
refugee-led Spike Wheat Scots Group. Currently, 14 community-run food larders operate across
North Ayrshire. They network with each other well to support innovation and share resources. In
addition to helping to address food poverty, they each provide bespoke support to individuals
and families to address wider issues in their lives. In many cases this support is life changing for
their members, and for some lifesaving. Ambitious community organisations and committed
volunteers provide a wide range of services and programmes that support community members
very effectively. They are instrumental in taking forward essential, needs-focused provision in
many local areas. They support local people well on a wide range of issues including poverty,
mental health, and addiction. Garnock Valley men’s shed is helping to tackle social isolation and
developing the skills of its members.  
CLD partners are effective in supporting learners, community activists and volunteers to gain
skills that match their aims and ambitions. Young people gain a wide range of skills, develop
confidence, and progress towards their career aims through the CLD Modern Apprenticeship
programme. Modern Apprentices (MAs) support young people from across North Ayrshire well
to be heard, respected and influential, including through Joint Cabinets. At each Joint Cabinet
120 young people from schools across North Ayrshire make sure their voices are heard and
their lived experience is taken into account as decisions are made. CLD service staff support
71

Page 72

4   | Community Learning and Development Progress Visit Report - North Ayrshire Council  
© Crown Copyright
community organisations effectively to engage with local people to design services. ‘Doon The
Beach’ community café is a strong example of a local partnership that has enhanced the local
environment, creating a local business with employment and volunteering opportunities. 
Areas for development 
CLD partners should now consider how they can use the data and other information they each
gather to better demonstrate their collective impact and progress over time. The CLD service
should continue work to create approaches to extend data sharing, analysis, and reporting
across all CLD partners. This would help to provide a clearer picture of the difference CLD is
making in North Ayrshire for senior leaders, funders, staff, and volunteers. Whilst there are
areas of strength within adult learning provision, overall this is less well developed and
coordinated across partners than other aspects of CLD. There is now a need for partners to
work together to ensure that prospective and current adult learners are clear about the
programmes and pathways available to them. 
3. Practice worth sharing more widely 
The MA programme run by North Ayrshire CLD service has a significant impact on the young
people who participate, the learners and communities they support as apprentices, and on the
CLD service. Apprentices contribute to and run a wide range of CLD programmes across the
local authority. They are key to the development of young people’s empowerment and
involvement in influencing decisions. They are instrumental in running the Joint Cabinets
between young people and elected members. Young people on the programme gain a wide
range of skills and gain confidence. Whilst the staff provide clear leadership and support to the
apprentices, the apprentices themselves also influence the CLD service. The input from MAs is
helping the service be innovative and remain responsive to learners’ changing needs, especially
for children and young people. 
4. What happens next? 
The local authority and their CLD partners are making sufficient progress with their CLD plan
and have the capacity to continue to improve. As a result, HM Inspectors will take no further
action in relation to this progress visit. During the inspection, we identified an aspect of highly
effective practice which we would like to explore further. 
Alona Murray
HM Inspector
31 October 2023 
72

Page 73

NORTH AYRSHIRE COUNCIL 
25 January 2024 
Audit and Scrutiny Committee 
Title:    Our Performance Strategy 2023-28 
Purpose:  To advise the Audit and Scrutiny Committee of Our
Performance Strategy 2023-28, including a new approach
to self-assessment. 
Recommendation:  The Audit and Scrutiny Committee notes Our Performance
Management Strategy and that it forms the basis of
performance management within our Council. 
1. Executive Summary 
1.1. This paper presents Our Performance Management Strategy 2023-28 and
proposed systematic approach to self-assessment.  Our Performance
Management Strategy has been updated following the approval of Our Council
Plan 2023-28 by Council in June 2023.  It reflects the Accounts Commission
Statutory Performance Information Direction 2021, learning from the previous
strategy and includes key findings from the initial Best Value Thematic Audit.
2. Background 
2.1. The Accounts Commission Statutory Performance Information Direction 2021
was published in December 2021.  This Direction, effective from April 2022 until
March 2025, has a stronger emphasis on self-assessment (as well as other key
areas) than the previous Direction.
2.2. In January 2022 the Executive Leadership Team (ELT) discussed the Direction
and agreed a revised Performance Management Strategy and new approach to
self-assessment should be considered.  It was decided the new approach to
self-assessment would be included within the revised Performance
Management Strategy 2023-28 following approval of Our Council Plan.  This
also provided the opportunity to gain more insight into the new Best Value
Thematic Approach introduced during 2022-23 which directly drives the design
and implementation of performance management across our Council.   
2.3. Our Performance Management Strategy 2023-28, attached at Appendix 1,
combines learning from the previous strategy with the Best Value Thematic
Approach and initial draft results of the audit.
Agenda Item 6
73

Page 74

2.4. Though intended to be valid throughout the lifetime of Our Council Plan 2023-
28, it will need to be reviewed following any statutory or national policy changes
such as a new Direction (due December 2024) or changes in the National
Performance Framework (currently being consulted on).
2.5. Self-Assessment
2.6. Our proposed approach to self-assessment is summarised on page 17 of
Appendix 1. How we self-assess will evolve as we gather feedback on the
process and continually adapt and improve.  For this reason, it is purposefully a
summary within the strategy.  Further details on the proposed approach are
below.
2.7. During discussions at ELT in January 2021 it was suggested the self-
assessment approach could be used to allocate resources effectively across
teams/services and identify potential areas of transformation.  Following the
development of Our Council Plan in June 2023 and release of the 2023 Public
Service Improvement Framework (PSIF) for self-assessment in November, it is
proposed that North Ayrshire Council adopts the 2023 PSIF approach to self-
assessment.  
2.8. It is acknowledged that some approaches to self-assessment can be resource
intensive, however we would alter our approach based on the ‘risk’ of a
particular team and the depth of assessment would be tailored accordingly. 
The 2023 PSIF includes ‘red threads’, these are versions of the framework
tailored to particular areas to ensure an efficient and effective process. In
addition, the framework provides an opportunity to tailor it further to the needs
of each area.
2.9. Prioritisation would be based on the statutory and corporate risk, impact on our
communities, financial risk (investment in that team/service), potential
reputational damage and whether any external scrutiny of that team/service
had recently taken place.  The findings of these investigations/audits would
allow a decision on whether further assessment is necessary at this time.  The
approach would link with the Service Reviews process being undertaken by
Financial Services.
2.10. Discussions have taken place with other local authorities via national groups,
with many re-establishing scheduled self-assessments and using risk to
prioritise services.
2.11. Next Steps
2.12. Following approval of the self-assessment approach, officers will identify
planned audits and inspections across our Council to help inform a timetable.
2.13. A medium-term programme of the teams/services prioritised for self-
assessment would be agreed with ELT and Heads of Service.  Following this,
the Corporate Policy, Performance and Elections team would work with the
team/service to utilise the PSIF.  The Improvement Service has agreed to
support the initial PSIF self-assessment and train relevant officers in self-
assessment.  Self-assessment would involve consideration of the following:
74

Page 75

• PSIF self-assessment questionnaire.
• Recent audits, inspections and accreditations.
• Operational Plans (service outputs and outcomes).
• Benchmarking opportunities.
• People statistics such as employee absence, additional costs, health and
safety, complaint handling, compliments and request response times (for
example Elected Member, MP and MSP requests and FOIs etc.) to gain a full
understanding of the performance and ‘health’ of a team.
• Financial management.
• Reputational management (communications and consultations).
• Discussion of results with relevant Senior Managers and Heads of Service prior
to final report development and peer review.
• Capturing ideas for innovation or cross service working to improve performance
and inform transformation. 
2.14. An operational report would be produced and reviewed by a peer review group,
similar to the approach undertaken prior to 2020 for Directorate Plan reports. A
summary of this report would be published on our website in line with the
Direction.  Following self-assessment, we would develop work around peer
review with other local authorities where appropriate, again with the support of
the Improvement Service.
2.15. This approach would be in addition to any scrutiny already existing through
public consultations or self-assessment of committees.
3. Proposals 
3.1. It is recommended that the Audit and Scrutiny Committee notes Our
Performance Management Strategy and that it forms the basis of performance
management within our Council. 
4. Implications/Socio-economic Duty 
Financial
4.1. The Executive Leadership Team are considering how resources can be
provided to help support self-assessment.
Human Resources
4.2. The Executive Leadership Team are considering how resources can be
provided to help support self-assessment.
Legal
4.3. We have a statutory duty to demonstrate Best Value.  Our Performance
Management Strategy and self-assessment approach support this.  
75

Page 76

Equality/Socio-economic
4.4. There are no equality or socio-economic implications. 
Climate Change and Carbon
4.5 There are no climate change and carbon implications.
Key Priorities
4.6 Our Performance Management Strategy directly supports the management of
Our Council Plan 2023-28.  It is particularly focused on the priority ‘A
Sustainable Council’.
Community Wealth Building
4.7 There are no climate change and carbon implications. 
5. Consultation 
5.1 Consultation was undertaken with the Executive Leadership Team. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Team Manager (Corporate
Policy and Performance), on 01294 324035 or email IslaHardy@north-
ayrshire.gov.uk.
76

Page 77

Our Performance
Management Strategy
2023-28
“Driving continuous improvement
for the people of North Ayrshire”
Appendix 1
77

Page 78

Page 1 of 18
Contents
Welcome ........................................................................................................................................................................... 2
Key Objectives ............................................................................................................................................................... 2
Statutory Duty and National Context ............................................................................................................................... 3
Best Value ..................................................................................................................................................................... 3
Direction 2021 ............................................................................................................................................................... 3
National Performance Framework ............................................................................................................................... 5
The Local Government Benchmarking Framework ...................................................................................................... 5
Local Context ..................................................................................................................................................................... 6
The Community Plan ..................................................................................................................................................... 6
Our Council Plan 2023-28 ............................................................................................................................................. 6
Operational and Team Plans ......................................................................................................................................... 6
Personal Development Reviews ................................................................................................................................... 7
Our Staff Values ........................................................................................................................................................ 7
Strategic Risks ............................................................................................................................................................... 7
Performance Management ............................................................................................................................................... 8
The “Golden Thread” .................................................................................................................................................... 8
Key Policies .................................................................................................................................................................... 8
Roles ............................................................................................................................................................................ 10
The Continuous Improvement Cycle - Plan Do Learn Act ........................................................................................... 11
Benchmarking ............................................................................................................................................................. 12
Performance Reporting and Scrutiny .......................................................................................................................... 12
Actions..................................................................................................................................................................... 13
Performance Indicators........................................................................................................................................... 14
Performance Status (RAG Status) ........................................................................................................................... 14
Schedule of Corporate Reporting ........................................................................................................................... 15
Planned Improvements ................................................................................................................................................... 16
The Council Plan Performance Management Framework .......................................................................................... 16
Tell Us Once ................................................................................................................................................................ 16
Best Value Thematic Approach ................................................................................................................................... 16
Pentana Risk ................................................................................................................................................................ 16
Self-Assessment .......................................................................................................................................................... 17
Benchmarking ............................................................................................................................................................. 17
Quarterly Performance Update Deadlines ................................................................................................................. 17
Format of Public Facing Reports ................................................................................................................................. 18
Publication of Reports and General Information ........................................................................................................ 18
Power BI ...................................................................................................................................................................... 18
Training ....................................................................................................................................................................... 18
Learning From Our Services ........................................................................................................................................ 18
Support to Embed Continuous Improvement............................................................................................................. 18
Managing Strategy Effectiveness ................................................................................................................................ 18 
78

Page 79

Page 2 of 18
Welcome 
The core purpose of effective performance management is to improve the lives of the people we serve by
using high quality information to make decisions.  
We believe the impact our services have on our residents, employees, businesses and visitors cannot be
demonstrated through charts alone.  It requires a balance of quantitative and qualitative information such as real
lived experiences and case studies to measure impact, provide context and effectively inform decision making.  This
approach relies on excellent communication between all teams to share information and is supported by both the
Accounts Commission’s Direction 2021 and the Scottish Government’s National Performance Framework.  
This strategy outlines how our performance management supports a culture of continuous improvement within our
Council to support our priorities and so provide the best outcomes for our people.  It provides an overview of
statutory context and our current performance management arrangements.
Secondly, it includes an overview of planned developments to ensure continuous improvement within our
performance management up until 31st March 2028 (coinciding with the lifespan of our current Council Plan). 
Innovation to ensure effective and transparent performance management will be central to our activities.  We
reviewed the outcomes of our previous Performance Management Strategy and these have informed our approach.
Finally, this strategy does not attempt to list the vast range of improvement activities currently underway in our
Council.  These are already covered through existing strategies published on our website.  Similarly, this strategy
excludes Health and Social Care Partnership performance, which is managed separately.
This strategy is managed by the Corporate Policy, Performance and Elections Team and we would welcome any
feedback you may have.  We are constantly striving to make our Council and reports as accessible as possible and
welcome opportunities to discuss how this can be achieved.  For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
Key Objectives
Empower and support
teams to embed
continuous improvement
throughout our Council
Establish an effective
dynamic performance
management framework
that reflects our services
Develop perception of
performance as driving
continuous improvement
for the people we serve
Focus on efficient,
transparent and robust
performance
management, minimising
duplication and embracing
innovation
Enhance accessibility
through relevant, clearly
understood publications,
available through a variety
of channels for our
residents and stakeholders
Collaborate with and learn
from teams across our
Council and beyond
Encourage and support
effective scrutiny at all
levels within our Council as
well as by external
stakeholders
Establish the Corporate
Policy, Performance and
Elections Team as key
point of contact for
performance management
79

Page 80

Page 3 of 18 
Statutory Duty and National Context
This section outlines the statutory duty of Best Value and the national context that needs to
be considered within Our Performance Management Strategy.   
Best Value 
Best Value is a statutory duty as set out in the Local Government (Scotland) Act 2003 and applies to all public bodies
in Scotland.   Its core purpose is to ensure good governance, effective use of resources and continuous improvement
in order to deliver better outcomes for our people.
A new approach to auditing Best Value within Scottish councils came into effect during 2022/23.  (Note:  This
approach relates to councils only.  The Accounts Commission decided in 2021 not to proceed with Best Value audits of
Integrated Joint Boards (IJBs) following a pilot and national policy developments.  Broad local and national audits of
IJBs will be used instead.)
The new annual Best Value Thematic Approach explores a particular area of Best Value each year.  The theme
covered reflects local government risks and challenges and is determined by the Accounts Commission each year.  
All 32 local authorities will be audited on the selected theme by their external auditors. 
The results of the audit will be integrated into the Annual Audit of each council in the
autumn.  In addition, a national thematic report will be produced to show a Scotland-
wide view of performance.
At least once every five years a council’s report will be highlighted to the Accounts
Commission by the Controller of Audit through a section 102 report.  The current
programme of Best Value reporting is due to be published in October 2023, with final
reports in August 2027.
At time of writing our most recent Best Value Audit Assurance Report was published in
June 2020 and is available by clicking on the image to the right.  We are currently
undertaking the Best Value Thematic Approach for 2022/23, the results will be included
in the Annual Audit expected to be published in November 2023.
Where the audit identifies areas for improvement, these will form part of an action plan
managed by the Corporate Policy, Performance and Elections Team on behalf of the Executive Leadership Team.   
Actions are expected to be monitored within the audit year by the appointed external auditors on behalf of the
Accounts Commission.  Updates on Best Value actions will be reported regularly to Cabinet, Council and the Audit
and Scrutiny Committee as appropriate.
Direction 2021
The Accounts Commission has the statutory power to determine the performance information that must be
published by local authorities.  The Accounts Commission’s Direction 2021 on Public Performance Reporting came
into effect in April 2022 and defines how local authorities should demonstrate they are achieving Best Value for their
residents up to March 2025.
The Direction gives flexibility in determining which performance indicators (PIs) meet the requirements of Best
Value.  Central to this is demonstrating continuous improvement and self-awareness in terms of our strengths and
80

Page 81

Page 4 of 18
areas for improvement.  The Accounts Commission expects us to ensure balanced reporting as timeously as is
practical. 
Our strategy will be immediately refreshed following any new Direction from the Accounts Commission.
An extract from the 2021 Account Commission Direction showing the two Statutory Performance Indicators (SPIs) is
below: 
“Each council will report on a range of information covered by the following two indicators (including in combination
if desired):
Statutory Performance Indicator 1: Improving local services and local outcomes 
• Its performance in improving local public services, both provided by itself and in conjunction with its partners
and communities. 
• Progress against the desired outcomes agreed with its partners and communities. 
The Commission expects the council to report such information to allow comparison (i) over time and (ii) with other
similar bodies (thus drawing upon information published by the Local Government Benchmarking Framework and
from other benchmarking activities). 
The Commission expects the council to, in agreeing its outcomes with its partners and communities, report on how it
has engaged with, responded to and helped to empower its communities, including those who require greater
support. 
Statutory Performance Indicator 2: Demonstrating Best Value 
• Its assessment of how it is performing against its duty of Best Value, including self-assessments and service
review activity, and how it has responded to this assessment. 
• Audit assessments (including those in the annual audit) of its performance against its Best Value duty, and
how it has responded to these assessments.
• Assessments from other scrutiny and inspection bodies, and how it has responded to these assessments. 
In satisfying the requirements set out in this schedule, the Commission expects the council to take cognisance of
current statutory guidance on Best Value requirements, and in particular to ensure: 
• Balance in reporting areas of improvement that have been achieved and not achieved. 
• This is undertaken in a timely manner. 
• Easy access to its performance information for all of its citizens and communities, with such information
presented in an accessible style.” 
The 2021 Direction is the core focus of our Performance Management Strategy.  Key changes between 2018 and
2021 Direction include greater focus on:
• Self-assessment and evidencing how this is used to improve services. (SPI 1)
• Assessments and inspections and how we have used this information to improve. (SPI 2)
• Empowering communities, particularly those requiring additional support, to set priorities and scrutinise
performance in an accessible way. (SPI 1 and 2)
• Supporting the new annual Best Value Thematic Approach. (SPI 2) 
81

Page 82

Page 5 of 18
National Performance Framework
The Scottish Government’s National Performance Framework aims to
create a more successful country with more opportunities and better
wellbeing for the people of Scotland.  It looks to create sustainable and
inclusive growth and reduce inequalities by giving equal importance to
economic, environmental and social progress and aligns to the United
Nations’ Sustainable Development Goals. 
The National Performance Framework directly influences the outcomes
within our Council Plan.  Further information is available by clicking the
image to the right.
At time of writing a review of the National Outcomes is taking place. 
Following this review our Performance Management Strategy will be
updated with any amendments. 
The Local Government Benchmarking Framework
The Local Government Benchmarking Framework (LGBF) is administered by the Improvement Service in partnership
with SOLACE.  It is highlighted within the Direction 2021 and provides an opportunity to benchmark our performance
with other local authorities in Scotland.  As a result, many of the indicators are used within our Council Plan.  
By recording the same indicators as other local authorities across a wide
range of themes we can identify opportunities to learn from each other. 
The Direction 2021 gives scope to focus on the LGBF indicators that
directly link to our Council Plan priorities.  South Lanarkshire Council took
this approach as highlighted by the Accounts Commission in the Local
Government in Scotland Overview 2023.  As a result, we have adopted this
approach in 2023.
Local authorities with similar traits such as type of geography and levels of deprivation are categorised into “family
groups” to enable as close as a like for like comparison as possible.  Performance can be explored through the LGBF
online tool by clicking the image above and further information is contained in the Benchmarking section of this
strategy. 
82

Page 83

Page 6 of 18
Performance Management 
Local Context
This section outlines local context that needs to be considered within Our Performance Management
Strategy.   
The Community Plan
The Community Plan (Local Outcome Improvement Plan), is administered by our North Ayrshire Community Planning
Partnership which consists of public, private and voluntary organisations and groups working together with
communities through our six Locality Partnerships to make North Ayrshire a better place to live.  The Community
Plan has three themes: 
• Wellbeing – Health and Wellbeing – Reducing inequalities by targeted
support to improve individual, family and community wellbeing.
• Work – Economy and Skills – Addressing the causes and effects of poverty
through a strong local economy and skills base.
• World – Climate Change – Working more closely and effectively together
to reduce carbon emissions and mitigate the impacts of climate change. 
Locality Plans
Locality Plans are created by each of the six Locality Partnerships in North Ayrshire.  Though supported by
officers within our Council, the priorities and plans are led by our communities.  As such, priorities vary by
locality. 
Our Council Plan 2023-28
Our Council Plan 2023-28 is the main strategy for our Council for the next five years.  Our vision ‘A North Ayrshire
that is fair for all’ is shared with The Community Plan.   Our mission ‘Working together to improve the lives of our
people in North Ayrshire’ demonstrates how continuous improvement is embedded within our culture. 
Our Council Plan outlines our priorities created in partnership with our residents and is aligned to The Community
Plan.  It is the core basis of our statutory performance reporting as outlined in the Accounts Commission Direction
2021.  All plans that sit underneath Our Council Plan must align to it.  Our Council Plan has four interlinked priorities: 
• Wellbeing – To transition to a wellbeing economy, delivering
prosperity, wellbeing and resilience for local people.
• Communities and Local Democracy – We will have active, inclusive and
resilient communities.
• Climate Change – To achieve net-zero by 2030.
• A Sustainable Council – A community Wealth Building Council that is
efficient and accessible, maximising investment and focusing resources
towards our priorities. 
For more details, please click the image on the right. 
Operational and Team Plans
Operational and Team Plans are not reported in the public domain, however they are critical in providing the detail
needed to deliver Our Council Plan priorities.  Operational Plans inform Team Plans, which in turn are more detailed. 
Both Operational Plans and Team Plans are crucial in supporting self-assessment. 
83

Page 84

Page 7 of 18
Performance Management
Personal Development Reviews
Personal Development Reviews are key to ensuring all employees are aware of how their actions contribute to the
Council Plan priorities.  They should take place at least once per year in addition to regular discussions about
personal and team performance with line managers.  Personal Development Reviews are also known as “Our Time
To Talk” for all non-teaching employees, “Personal Review and Development” for teaching employees and
psychologists and “Participant Quarterly Progress Reviews” for Modern Apprentices. 
Our Staff Values
Our Staff Values support a culture of continuous improvement by providing key guidance on how employees
are expected to approach their activities.  They are central
to our recruitment and employee development.  For further
details please click on the image to the right. 
Strategic Risks
We are risk aware, not risk averse.  To ensure effective risk management many activities taken to mitigate strategic
risks can be found within our Council Plan and Operational Plans. 
84

Page 85

Page 8 of 18
Performance Management
Performance Management
The “Golden Thread”
Every task of every employee within our Council contributes to achieving better outcomes for the people of North
Ayrshire.  This link is referred to as the “Golden Thread”.  An overview is shown below:
Best Value Duty
National Performance
Framework
Community Plan (LOIP)
Council Plan
Operational Plans
Personal Development
Reviews 
“Our Time to Talk”, “Personal
Review and Development” or
“Participant Quarterly Progress
Reviews” depending on role.
Locality Plans
Strategic Risks
Our Staff Values
Focus
Passion
Inspiration
Key Policies 
(See section below)
85

Page 86

Page 9 of 18
Performance Management
Key Policies
The policy landscape is summarised below:
National Themes / Policies 
• Best Value and continuous improvement
• Community Empowerment (Scotland) Act 2015
• Best Start Bright Futures Tackling Child Poverty
Plan 2022-26
• The United Nations Convention on the Rights of
the Child (UNCRC) 
• The Promise
• Getting it Right for Every Child (GIRFEC)
• Islands (Scotland) Act 2018
• Human Rights Based Approach
• Fairer Scotland Duty
• Equality Act 2010
• Climate Change (Emissions Reduction Targets)
(Scotland) Act 2019 – Net Zero Scotland by 2045
• Placemaking Approach
• National Strategy for Economic Transformation
(NSET)
• Green recovery and renewal 
Local Strategies
• Community Wealth Building Strategy
• The Regional Economic Strategy
• Community Plan (LOIP)
• Health and Social Care Partnership Strategic
Plan
• Education Service Improvement Plan
• Child Poverty Action Plan
• Children’s Services Plan
• Children’s Rights Report
• Youth Participation and Citizenship Strategy
• Island Plans
• Regeneration Delivery Plan
• Local Housing Strategy
• Strategic Housing Investment Plan (SHIP)
• Local Development Plan
• Environmental Sustainability and Climate
Change Strategy
• KA Leisure (North Ayrshire Leisure Limited)
Business Plan  
86

Page 87

Page 10 of 18
Performance Management
Roles
Everyone is responsible for performance, every task undertaken in the working day contributes to our “bigger
picture” outlined by Our Council Plan (as detailed in the “Golden Thread” section above).  However, roles have
specific responsibilities in terms of performance management.
The Accounts Commission is the independent public watchdog for local government, they
report directly to our residents.Accounts Commission
North Ayrshire Council is responsible for approving the Council plan which sets out our vision
and direction for five years.North Ayrshire Council
The Audit and Scrutiny Committee has oversight of a range of functions including the
preparation of a strategy for performance review; ensuring that Chief Officers establish and
implement arrangements for reviewing service performance against objectives; monitoring the
performance of the Council towards achieving policy objectives and priorities; and reviewing
the implementation of Our Council Plan.
North Ayrshire
Council's  Audit and
Scrutiny Committee
Cabinet is the main decision making body within our Council.  It is responsible for the setting of
the vision and direction of our Council, scrutiny of performance and approving the submission
of performance reports to the Audit and Scrutiny Committee.
North Ayrshire Council
Cabinet
The Executive Leadership Team has strategic responsibility for our Council Plan, scrutinising
performance and agreeing action and resources to address areas of underperformance.
Executive Leadership
Team (ELT)
Executive Directors are responsible for the strategic direction of their directorate and ensuring
it is inline with Our Council Plan. They have overall responsibility for the performance of their
directorate.  In addition they are directly involved in finalising the priorities and content of Our
Council Plan.
Executive Directors
Heads of Service are responsible for managing and scrutinising the performance of their teams
through Council Plan reporting and Operational Plans.  In addition they scrutinise and approve
the release of information to external regulators. They also identify opportunities to learn by
benchmarking performance with others (not limited to other local authorities).
Heads of Service
The Corporate Policy, Performance and Elections Team leads the delivery of the statutory duty
to demonstrate Best Value as set out in the Local Government (Scotland) Act 2003.  This
includes supporting the Executive Leadership Team in the creation, management and reporting
of Our Council Plan and other performance frameworks, contributing to national performance
networks and collaborating with all teams within our Council to achieve continuous
improvement.
Corporate Policy,
Performance and
Elections Team
Managers are responsible for managing the performance of their team and supporting their
team to deliver overall objectives in Our Council Plan.  In addition Senior Managers are
responsible for Operational Plan creation including setting objectives and targets and may be
involved in updating Council Plan performance.  They also identify opportunities to learn by
benchmarking performance with others (not limited to other local authorities).
Senior Managers and
Team Managers
We all contribute to Our Council Plan through delivering the tasks agreed in our team plans and
personal development reviews.  As a result we all contribute to improving outcomes for the
people we serve.All Employees
87

Page 88

Page 11 of 18
Performance Management
The Continuous Improvement Cycle - Plan Do Learn Act
Performance management and performance reporting are very different things.  Performance management is using
the information available to us to effectively plan, undertake activities and learn from the results.  We then act on
this learning to inform future planning to meet the needs of the people of North Ayrshire.  This is known as “The
Continuous Improvement Cycle” or “Plan, Do, Learn, Act”.   Performance reporting is a method within the “Learn”
part of this cycle to show what has been achieved so progress can be effectively scrutinised and any changes to the
approach made (in the “Act” and “Plan” stages).   
This really is a continuous improvement cycle with its complexity and timescales tailored to the strategic level, scale
or risk of a plan, project or activity.  It is key to effective performance management throughout North Ayrshire
Council.  
Be SMART:  SMART objectives and indicators* are: 
Specific  Precise in what we are trying to measure.  
Measurable Realistic in terms of how we can measure the indicator and how practical it is to source this
data when needed.  If the effort of sourcing the data outweighs its value, then an alternative
measure could be a better choice.
Achievable Ambitious but realistic targets.
Relevant The measure relates to our priorities, will tell us what we need to know to make a decision and
relates to the overall aim.
Time-bound  There are timeframes for achieving goals. 
*It is important to make a distinction between SMART indicators and other sources of information such as real lived
experiences which are invaluable in informing policy and demonstrating impact. 
Focus on:  The outcomes we are wanting to achieve;
Who else we can potentially compare to and learn
from (benchmarking); Resources available and how
we will undertake activity; How we measure progress
and effectiveness using SMART indicators such as
performance indicators and actions; and target
setting.
Use the results of the “Act” stage to inform future
approaches to achieving outcomes.
Carry out the activity.
• Report and scrutinise the outcomes of the activity by
using the indicators.  Did we achieve what we set out
to?  (Target setting at the “Plan” stage is essential to
answer this question and provide the evidence needed
for effective scrutiny.)  
• Has anyone else achieved better outcomes and could
we learn from a better performing team / authority /
organisation (benchmarking)? 
Use the insight generated at
the “Learn” stage to
determine what we should do
differently; what we should
do again and how we could
develop further. 
The Continuous
Improvement
Cycle
88

Page 89

Page 12 of 18
Performance Management
For further details about the “Continuous Improvement Cycle”, creating performance measures and setting targets
to effectively manage performance, please contact the Corporate Policy, Performance and Elections Team.  Further
information on benchmarking can be found in the next section.
Benchmarking
Benchmarking is comparing our performance to others (not only the public sector or within the UK) and learning
how to improve as a result.  This is not limited to comparing performance indicators, we actively benchmark by
comparing different approaches to address the same issue or achieve similar outcomes.  
We are one of 32 Scottish local authorities utilising the Local Government Benchmarking Framework (LGBF),
coordinated by the Improvement Service and SOLACE.  This framework enables us to compare our performance
across a wide range of themes with other local authorities in Scotland.  In addition, to provide as close a comparison
as possible, councils with similar traits are grouped into “family groups”.  This gives us access to a wide range of
comparable data on as close to a like for like basis as possible.  Further details on the LGBF can be found above.
We compare performance through several routes, many of which are specialised such as APSE.   
Performance Reporting and Scrutiny 
We have a statutory duty to report our performance in a balanced and timeous way.  In addition, the process of
reporting our performance ensures effective scrutiny by peers, Elected Members and ultimately our residents.  An
overview of the process is shown below. 
In addition, there is a good deal of checking data, ensuring notes explain performance and provide context, sourcing
qualitative information around the impact we are having such as case studies and ensuring our reports are accessible
and relevant to the people of North Ayrshire.  This includes the use of Power BI as the basis of our North Ayrshire
Performance Dashboard.
Updates added
to Pentana Risk
Data checks and
additional
information
sought
Report drafted
Report
reviewed
by Heads
of Service
Report reviewed
by Executive
Directors
Report
finalised
Report
scrutinised and
approved by
Executive
Leadership Team
(Q2 and Q4 only)
Report scrutinised
and approved by
Cabinet (now in
public domain)
Report scrutinised
and approved by
the Audit and
Scrutiny
Committee
Report published
on our website
and promoted via
social media.
89

Page 90

Page 13 of 18
Performance Management
As a result, effective time management is crucial to ensure reports are scrutinised and in the public domain while the
data is still as relevant as possible.  We work with teams to ensure good quality timeous information. 
Actions 
Actions represent an update on planned activity over a certain time period.  For this reason, action updates are
explanations of performance, including what is going well and, if an activity is behind schedule, what is being done to
address this.  
The actions within Our Council Plan summarise activity undertaken through existing key strategies.  The status of an
action is determined in one of two ways:
1. If the action has not yet reached its due date, an informed decision is made by the action owner on whether
they consider the action to be on target, slightly adrift or significantly adrift of where it should be at that
time.  This can be informed by project plans and milestones held within teams.  
2. If an action is not complete at its due date, it is automatically set as significantly adrift of target.  Due dates
can only be extended where there is a reasonable explanation to do so.  The amended timescales are then
presented to Cabinet for full transparency and approval.
Actions form the basis of the narrative within Council Plan Progress Reports.  A visual Action Status Tracker is
included in the reports to enable any action trends to be identified.
Action Timescales
Traditionally corporate performance management and reporting coincided with financial years, however with long-
term developments such as the Ayrshire Growth Deal as well as recognising that some services, for example
Education, work to different reporting frequencies and timescales such as academic years, this was reviewed as part
of our previous strategy.
In April 2021 we introduced a more dynamic form of performance management that reflects the activity rather than
the financial or academic year.  This ensures:
• Education performance is captured using term time frequencies and academic years where appropriate
within our corporate reporting.  (I.e. Academic year end is captured in Quarter Two / Mid-Year Council Plan
reporting.)
• Large scale projects are reported at a level where the full project, or relevant milestones (rather than small
elements), are reported – preserving the context and providing a holistic view of performance and impact.
As actions for specific areas end, potential replacement actions are identified.  These are approved by the Executive
Leadership Team and Cabinet when public facing performance reporting is presented for scrutiny and approval (at
Quarters Two and Four).  Rationale for any replacement actions is on a case-by-case basis based on priorities and
operating environment rather than like for like replacements.
The corporate Annual Performance Report remains aligned to financial years and captures all performance progress
within that year. 
90

Page 91

Page 14 of 18
Performance Management
Performance Indicators
Performance Indicators (PIs) are numerical measures such as ‘number of’, ‘percentage of’ and so on.  We set targets
where possible and appropriate to do so.  This informs the status of the PI at each reporting period (see below). 
Where practical to do so, PI reporting frequencies should be quarterly or half yearly within Our Council Plan in
addition to annual reporting, with a minimal lead in time.   
Performance Status (RAG Status)  
The performance status is also known as RAG status due to colour coding used to show progress (red, amber or
green).  Within our performance reporting the status of a PI or action is determined as follows: 
Status Description 
On target 
Slightly adrift of target (typically this represents a variance ≥ 1% and < 5% from the target). 
Significantly adrift of target (typically this represents a variance ≥ 5% from the target). 
Data only (PIs only) – this is where a target has intentionally not been set, usually due to the
indicator being a new indicator or where we can only partly contribute to the outcome. 
Data not available / status unknown - (PIs only) the status is not available either due to data not
being available or no target being set. 
When calculating the percentage of indicators with each status, the most recent available status is used up to the
previous financial year end.  For example, Quarter Two 2023-24 uses statuses up to 31st March 2023.  This ensures
any data with a time lag is reported, yet information older than this is given the status of “data not available” for this
calculation to ensure past performance does not impact on the scrutiny of current performance.  
Indicators set as data only or with no data available are excluded.  For example: 
Red status percentage = Number with red status X 100 
Number of red + amber + green status 
Positive and negative trends are shown within our reporting.  In terms of Our Council Plan these are defined as:
• Short-term Trend:  Comparison with previous year.
• Medium-term Trend:  Comparison with three years previously.
• Long-term Trend:  Comparison with more than three years previously.
91

Page 92

Page 15 of 18
Schedule of Corporate Reporting 
Quarter 1
(April to June)
Quarter 2
(July to September)
Quarter 3
(October to December)
Quarter 4
(January to March)
Annual
Council Plan
Light touch summary
presented to the
Executive Leadership
Team.
Full six-monthly progress
report produced for
scrutiny by the Executive
Leadership Team,
Cabinet and the Audit
and Scrutiny Committee. 
Published on our
website.
Light touch summary
presented to the
Executive Leadership
Team.
Full six-monthly
progress report
produced for scrutiny
by the Executive
Leadership Team,
Cabinet and the Audit
and Scrutiny
Committee. 
Published on our
website.
Full year Annual Performance
Report produced for scrutiny by
the Executive Leadership Team,
Cabinet and the Audit and
Scrutiny Committee. 
Published on our website. 
Public facing North Ayrshire
Performance Dashboard
updated.
Local
Government
Benchmarking
Framework
(LGBF)    
LGBF report produced for
scrutiny by the Executive
Leadership Team, Cabinet and
the Audit and Scrutiny
Committee. 
Published on our website.
Operational
Plans
Operational Plans are supported by the Corporate Policy, Performance and Elections Team.  They are reported within Services and
Directorates but are not in the public domain. 
In addition to corporate reporting, many directorates have specialised reporting to the Scottish Government, external regulators and groups. 
92

Page 93

Page 16 of 18
Planned Improvements
We have a duty to ensure balanced reporting and effective scrutiny.  This can only be achieved through
working alongside teams to address any issues and provide support where it is needed.  This section shows
how this will be achieved, alongside planned improvements to strengthen our compliance with the
Direction 2021.
The Council Plan Performance Management Framework
Within our previous Council Plan 2019-24 sub actions were introduced and sourced from existing strategies.  Though
intended to strengthen the golden thread between the Council Plan and teams, this resulted in approximately 100
specific actions within our Council Plan making effective scrutiny challenging.
Our Council Plan 2023-28 Performance Management Framework takes a more strategic approach, where actions are
higher level but mapped to existing strategies.  More than one team may be assigned an action.  Relevant teams are
then able to provide a fuller update, focussing on the performance of that strategy as well as associated activity. 
This should support more effective scrutiny and cross team working, promoting a whole system approach to our
delivery for the benefit of our residents.
Tell Us Once
Following a successful pilot during the Quarter Two 2020-21 reporting period, the Corporate Policy, Performance
and Elections Team adopted a “tell us once” approach, sourcing qualitative information from existing sources as far
as possible to minimise the duplication of effort within teams.  This was especially important due to frontline
services addressing immediate need due to the Covid-19 pandemic.  Though there is still scope to reuse information
held corporately, the extent of this approach will be scaled back.  This is to ensure teams can regain effective
ownership of their performance and a more strategic update can be produced in collaboration with Heads of Service. 
A proposal will be developed and presented to the Chief Officers Leadership Team (COLT) in January 2024.  
Best Value Thematic Approach
We will support the Best Value Thematic Approach across our Council.  This includes supporting the audit and
ensuring any actions are managed and reported as appropriate to the ELT, Cabinet, Council or Audit and Scrutiny
Committee as appropriate.
Pentana Risk
Pentana Risk is our corporate performance management system.  We will engage with services to improve how we
use Pentana to support effective and timeous updates of performance information.  
Deadlines for the year will be published in the North Ayrshire Council Pentana homepage alongside information on
additional support and links to final Progress Reports to help strengthen the reporting cycle.
We will enhance our use of portals (online viewing) to:
• Ensure users can view their own Council Plan actions and PIs, so there is a clear definition between statutory
Council Plan measures and internal reporting.
• Enable teams to run Operational Plan reports on demand as required, providing greater flexibility for non-
corporate updates within teams.
We will ensure corporately reported data is hosted centrally where appropriate.  However, we understand other
systems are in use for good reasons.  Therefore, we will not require the data to be transferred / duplicated onto
Pentana Risk other than for Corporate Reporting such as for our Council Plan or The Community Plan (LOIP).
We will ensure our performance management systems across our Council are supporting rather than defining our
performance management approach due to historic or other reasons.
93

Page 94

Page 17 of 18
Self-Assessment
A new approach to self-assessment will be introduced using the Public Services Improvement Framework (PSIF)
tailored to teams and services.  We will work with the Improvement Service to initiate the approach.  Key principles
will be:
• Use of PSIF tailored to risks and capacity of teams and services.
• Reporting to a ‘peer review’ group consisting of members of the Executive Leadership Team to invite
scrutiny and inform resource allocation.
• Reporting summaries on our website and within Council Plan progress reports as appropriate.
Information used to inform the assessment will include:
• PSIF self-assessment questionnaire.
• Recent audits, inspections and accreditations.
• Operational Plans (service outputs and outcomes including benchmarking opportunities).
• People statistics such as employee absence, additional costs, health and safety, complaint handling,
compliments, request response times (for example Elected Member, MP and MSP requests, FOIs etc.) to
gain a full understanding of the performance and ‘health’ of a team (balanced scorecard).
• Financial management.
• Reputational management (communications and consultations).
• Discussion of results with Senior Manager and Head of Service prior to peer review.
This is in addition to scrutiny provided through public consultations and self-assessment of committees.
Benchmarking
Benchmarking information such as data within the Local Government Benchmarking Framework was heavily
impacted by the Covid-19 pandemic.  This has meant the value of comparisons over recent years has been limited. 
As the data stabilises and is more reflective of Council performance, we will improve our approach to benchmarking
through:
• Ensuring benchmarked data relates directly to Our Council Plan priorities.
• Utilising Power BI to illustrate trends in a clearer way.
• Approach councils within our family group (or other councils performing particularly well) to understand our
relative performance and seek improvements.
Quarterly Performance Update Deadlines
Within the 2021-24 Performance Strategy we recognised competing demands on teams at quarter end and aimed to
resolve issues through:
• Extending corporate deadlines from two to three weeks after quarter end to accommodate associated
demands including gathering information from remote teams and data checking within secondary
performance management systems.  It also addressed capacity issues due to school holiday periods
coinciding with quarter ends.
• Extending deadlines only when agreed with the Corporate Policy, Performance and Elections Team under
certain circumstances, such as data source availability, data validation or team capacity issues.
• Educating teams in the need for deadlines to be met in order to produce reports that contain relevant
timeous information that can be effectively scrutinised, highlighting the impact of delayed reporting.
• Training to ensure where no update is available, a note will be provided by the team assigned the measure
to explain the reason and when the information will become available.
Deadlines are now three weeks after quarter end, however the other elements require further action and will
continue within the 2023-28 Performance Management Strategy.
94

Page 95

Page 18 of 18
Format of Public Facing Reports
We will continue to:
• Produce engaging “magazine” format performance reporting tailored for our residents.  
• Share reports directly with our own teams as well as community groups following publication.
• Work with teams to better engage with our young people.
• Encourage feedback and use this to further improve our reporting.
• Use consistent branding across all corporate performance documents.
• Engage more with residents through social media using the #NorthAyrshirePerforms.
• Ensure our reporting is accessible. 
In addition, we will capture recent audits, inspections and accreditations and associated improvement activity within
our Council Plan progress reports, linking to published reports where possible.
Publication of Reports and General Information
We will improve how our reporting is published both within our Council and externally through working with our
Communications Team to develop a regular schedule.  We will review our webpages and ensure all information is
relevant and timeous.
Power BI
We will continue to use Power BI to provide greater insights from the data we hold.  This includes people statistics
within Operational Plans, LGBF analysis and the North Ayrshire Performance Dashboard.
Training
Corporate training will be refreshed for performance management, scrutiny and Pentana.  The approach will be
based on feedback from teams across our Council.
Learning From Our Services
Performance should not be a desk-based exercise.  To enable effective reporting, it is important Policy and
Performance Officers have first-hand experience of many of the areas reported on.  As a result, representatives from
the Corporate Policy, Performance and Elections Team will be encouraged to attend events such as Locality
Partnerships and community forums, as well as other activities, to increase our understanding of how to report and
reach our residents more effectively.
Support to Embed Continuous Improvement
We will support teams to embed continuous improvement throughout our Council by offering a range of support as
listed below.   
• Benchmarking support – Not only output/data based, but outcome based.
• Scrutiny support – Develop training for officers and Elected Members on effective scrutiny of our performance.
• Signposting to data for policy creation – The Corporate Policy, Performance and Elections Team has knowledge
of, or access to, various sources of local and national data and information.
• Collaboration with other teams – Working closely with teams to make performance reporting as effective and
efficient as possible.
• Corporate data returns – coordinating key cross service data returns such as the LGBF return.
• Continued professional development of our team and those we support.
Managing Strategy Effectiveness
The above activities will be monitored through the Corporate Policy, Performance and Elections Operational Plan. 
Key activities will be included within Council Plan Progress Reporting where appropriate.
95

Page 96

Page 19 of 18 
For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000   Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
96

Page 97

NORTH AYRSHIRE COUNCIL
25th January 2024
Audit and Scrutiny Committee
Title: Year End Performance Reporting:  Council Plan Year
End Progress Report 2022-23; Annual Performance
Report 2022-23; and Local Government Benchmarking
Framework Analysis of 2023 Data Release
Purpose: To advise the Audit and Scrutiny Committee on progress of
our Council Plan priorities.
Recommendation: That the Audit and Scrutiny Committee agrees to: a) Note
the Council Plan Year End Progress Report and supporting
performance measures as set out at Appendix One, Two
and Three; b) Note the Council Plan Annual Performance
Report as set out in Appendix Four; and c) Note
the status of the Council’s performance indicators
within the LGBF Analysis of 2023 Data Release at
Appendix Five.
1. Introduction
1.1. Under the Local Government (Scotland) Act 1992 and Local Government in Scotland
Act 2003 we have a duty to demonstrate Best Value.  To ensure we are supporting
our residents, fulfilling our statutory duties and invite scrutiny, we actively manage
performance and develop our reporting to make it accessible.  Following Cabinet
approval, our corporate performance reports are published on our website www.north-
ayrshire.gov.uk/performance.
1.2. This report combines three key Council Plan and corporate performance reports:
• Our six-monthly Council Plan 2019-24 Progress Update (Year End 2022-23)
• Our Annual Performance Report 2022-23
• The Local Government Benchmarking Framework (LGBF) - Analysis of 2023
Data Release
2. Background
2.1. Our Council Plan 2019-24 was approved by Council in June 2019.  As our new Council
Plan 2023-28 was approved in June 2023, this 2022-23 year-end reporting cycle
marks the final reporting period for the 2019-24 Council Plan.  
2.2. The Council Plan 2019-24 Progress Update (Year End 2022-23) and accompanying
appendices provide detailed information on the progress made towards our strategic
priority outcomes.  The report includes key activities and case studies from across our
Council in a magazine style format.  It provides an overview of performance in the six
months up to 31st March 2023.  Areas of focus (next steps) are not included in this
report as these are reflected in our new Council Plan 2023-28.
Agenda Item 7
97

Page 98

2.3. Our Annual Performance Report 2022-23 summarises our performance across the
entire financial year.  As in 2021-22, to reduce duplication the Annual Performance
Report is a high-level summary with links to our more detailed six-monthly Council
Plan Progress Reports.  
2.4. The Local Government Benchmarking Framework (LGBF) Analysis of 2023 Data
Release provides information on how we compare to similar councils.  The LGBF is a
national framework collating performance information from across all 32 local
authorities and is specifically referenced within the Accounts Commission Strategic
Performance Information Direction. The Improvement Service, who administer the
LGBF, is currently exploring how to publish data more timeously, therefore though this
report mainly covers 2021-22 data as released during 2023, some information may
relate to more recent periods. Data is as downloaded in September 2023 unless
otherwise stated.
3. Performance Summary
3.1. Key Activities (October to March 2023)
• £434million Capital Investment Programme was approved by Cabinet.  This will be
key to the economic recovery of North Ayrshire in response to the cost of living
crisis.
• £3.3million was allocated to minimise the increase in council tax to support our
residents.
• A £1.4million Early Intervention Fund was established to help address child poverty
and the cost of living.
• Public mini enquiries were introduced to capture real lived experience and inform
our Child Poverty Action Plan.
• We held the first Annual Promise Conference in November, the first in Scotland
attracting 130 attendees and chaired by two of our care-experienced young people.
• 18,962 National Entitlement Cards have been used by our young people, providing
free bus travel.
• We awarded the tender for two Council owned solar farms on former landfill sites
at Nethermains, Kilwinning and Shewalton, Irvine.
• The formal opening of the £4.2million Lochshore Hub took place in October 2023.
• The first year of roundabout advertising has been successful.  28 locations have
been granted planning consent, generating £20,000 per year.
• 1,400 residents and 37 community groups from across all six localities contributed
to our budget consultation in January.
• Accessing Our Council, a key element of our ‘No Wrong Door’ approach is
progressing well.  Contact details have been rationalised to help direct our residents
to the support they need.
• Our Council has been recognised by Carers Scotland as a Carer Positive
‘Exemplary’ employer in Scotland. The award demonstrates the support our
Council provides for its employees who are working carers.
98

Page 99

3.2. Council Plan Performance Indicators
3.2.1. Appendix 2 details Performance Indicators from the Council Plan Performance
Framework, showing (where available) targets and a traffic light (Red, Amber,
Green) symbol to show whether:  The target level of performance has been
achieved (Green); is slightly adrift of target (Amber); or is significantly adrift of
target (Red).
3.2.2. Analysis of the indicators is outlined in Table 1 below.  Where data is not available
for Year End 2022-23, the most recently available data up to the annual figure for
2021-22 is used.  85.7% of indicators where the status is known are on target or
slightly adrift of target as at 31st March 2023.  This greater than last year, when
79.3% of indicators had this status.  The two-year period covered below reflects
the impact of the gradual easing of restrictions during 2021-22.
Table 1
Summary of Performance Indicator Status
Traffic Light Year End 2022-23 Year End 2021-22   
on target 17 (60.7%*) 18 (62.1%**)
slightly adrift 7 (25%*) 5 (17.2%**) 
significantly adrift 4 (14.3%*) 6 (20.7%**)
status unknown or
data only
5 (15.1% of all Council
Plan indicators)
5 (14.7% of all Council
Plan indicators)
* Of the 28 indicators where status is known
** Of the 29 indicators where status is known
3.3. Council Plan Delivery Plan
3.3.1. Appendix 3 details the 39 actions from the Council Plan Delivery Plan.  The status
of sub-actions informs the overall action status.
3.3.2. At Year End 2022-23, 87.2% of actions are either on target or slightly adrift of target
compared to 94.9% at Year End 2021-22.
Table 2
Summary of Overall Action Status
Traffic Light Year End 2022-23 Year End 2021-22 
on target 33 (84.6%) 32 (82.1%) 
slightly adrift 1 (2.6%) 5 (12.8%) 
significantly adrift 5 (12.8%) 2 (5.1%)
3.3.3. Following the approval of the new Council Plan 2023-28 any incomplete actions
relating to our new priorities were either absorbed into the new Council Plan
actions or included in Operational Plans as appropriate.  Any actions not directly
related to the new priorities were closed.
99

Page 100

4. Local Government Benchmarking Framework
4.1. In line with the Accounts Commission Strategic Performance Information Direction
2021, the PIs analysed within the LGBF framework directly relate to our priorities.  As
this report was produced in the transition period between the final reporting on the
Council Plan 2019-24 (when this performance was delivered) and our new Council
Plan 2023-28, the report includes measures included within both plans.  
4.2. In total 32 PIs closely relate to our priorities and are analysed within the report.  To
provide as close to a like for like comparison as possible, local authorities are grouped
based on similar levels of deprivation or rurality for each measure.  Trend information
is shown relating to the relevant family group alongside an explanation of performance.
4.3. The Improvement Service states that as this dataset covers the second year of the
pandemic, most of the information relates to 2021-22, the data should be interpreted
within this context.  
4.4. The analysis clearly shows the impact of the pandemic across the majority of
indicators.  Though we continue to face significant challenges in North Ayrshire in
areas such as child poverty, rent arrears and business startups; there are also signs
of recovery and / or consistently good performance such as in employability support,
proportion of people earning the living wage, energy efficiency of our homes, the
percentage of invoices sampled paid within 30 days and the speed of crisis grant
decisions.  This demonstrates how we are actively working to support our residents.
5. Proposals
5.1. That the Audit and Scrutiny Committee agrees to: a) Note the Council Plan Year End
Progress Report and supporting performance measures as set out at Appendix One,
Two and Three; b) Note the Council Plan Annual Performance Report as set out in
Appendix Four; and c) Note the status of the Council’s performance indicators within
the LGBF Analysis of 2023 Data Release at Appendix Five.
6. Implications/Socio-economic Duty
Financial
6.1. None
Human Resources
6.2. None
Legal
6.3. This report confirms the arrangements for the Council’s compliance with its duties
under the Local Government (Scotland) Act 1992 and the Local Government in
Scotland Act 2003 and our commitment to improving public performance reporting.
Equality/Socio-economic
6.4. None
100

Page 101

Environmental and Sustainability
6.5. None
Climate Change and Carbon
6.6. None
Key Priorities 
6.7. This report helps to demonstrate our Council’s delivery of our strategic priorities.
Community Wealth Building
6.8. There are no community wealth building implications.
7. Consultation
7.1. Feedback from the Executive Leadership Team (ELT) informed the content of this
report.
Aileen Craig
Head of Service (Democratic)
For further information please contact Isla Hardy, Team Manager (Corporate Policy and
Performance), email: IslaHardy@North-Ayrshire.gov.uk. 
Background Papers
Council Plan 2019-24
101

Page 102

Council Plan 2019-24 Progress Update
Year End 2022-23
Appendix 1
102

Page 103

Contents 
Our Performance at a Glance ............................................................................................. 1
Welcome ........................................................................................................................... 2
Our Council Plan 2019 - 2024 ............................................................................................. 3
Aspiring Communities – Key Activities................................................................................ 4
Aspiring Communities – Case Study ................................................................................... 8
Inspiring Place – Key Activities ........................................................................................... 9
Inspiring Place – Case Study ............................................................................................. 12
A Council for the Future – Key Activities ........................................................................... 13
Performance Summary .................................................................................................... 16 
The Corporate Policy, Performance and Elections Team welcome any feedback you may have.  We strive to make
our Council and reports as accessible as possible and appreciate opportunities to discuss how this can be achieved. 
For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
103

Page 104

Page 1 of 38 
20% our Modern
Apprenticeships
ringfenced for
those with a
disability or who
are care-
experienced
172 community and
partner
representatives
attended our
Tackling Child
Poverty mini
enquiries
Over 35,000 
new trees 
planted
£1.4m
Early
Intervention
Fund
established
Our two new
council-owned
Solar PV farms in
Shewalton and
Nethermains are at
the design phase
with the tender
awarded
£80,000 to develop
the skills of our
residents in Arran
and Cumbrae 
Electric Vehicle
charging
infrastructure
expanding
£3.3million to
support our
residents by
minimising the
increase of council
tax 
Our Performance at a Glance 
£434 million
Capital
Investment
Programme
approved for next
10 years
Community
Renewable Energy
Generation Funding
Scheme established 
New 
Financial Inclusion
Strategy 2023-28 
launched
Almost 19,000 Free
Bus Travel Passes
issued to those under
22 years of age 
104

Page 105

Page 2 of 38 
Welcome 
Welcome to the Year End Progress Report on our Council Plan.  This report covers the last six
months of 2022/23 and, following the approval of our new Council Plan 2023-28 by North Ayrshire
Council in June 2023, concludes our Council Plan 2019-24.
Challenges continue to be felt by our residents and communities in relation to the cost of living and
supporting our residents with these challenges remains a key area for our Council.  We delivered a
balanced budget, approved by Council on 1st March 2023 focussing on supporting our residents. This
included ensuring North Ayrshire’s council tax increase was lower than inflation.  We also allocated
£1.4m to our Child Poverty and Cost of Living Board to directly address the causes of poverty and
help our most vulnerable residents find a sustainable route out of poverty.
If you are in need of assistance with the cost of living, please visit this link to the North Ayrshire
Council Cost of Living Support webpage or call 01294 310000.
Our Strategic Housing Investment Plan (SHIP) continues to deliver a range of homes across all our
localities.  This includes general needs housing, wheelchair accessible and supported housing, with
831 homes (including employee units) delivered over the lifetime of our Council Plan 2019-2023.  
Our new SHIP 2023-2028 was approved by Cabinet in November 2022 and supports the Scottish
Government’s Affordable Housing Supply Programme.  This will see the further development of
homes for our residents across North Ayrshire.
Mitigating the impact of climate change is always at the heart of our projects.  This will be
increasingly evident over the next few years as our £434million Capital Investment Programme is
rolled out focussing on more sustainable developments and the longevity of our environment
including the creation of two new solar farms in North Ayrshire.  
Next steps and areas of focus are not included within this report as, following the approval by
Council of our new Council Plan 2023-28, it contains details on our new priority areas.
Together we can create a North Ayrshire that is Fair For All.   
105

Page 106

Page 3 of 38 
Our Council Plan 2019 - 2024 
Our Vision
A North Ayrshire that is ‘Fair for All’ 
Our Mission
Working together to improve wellbeing, prosperity
and equity in North Ayrshire 
Our Priorities
Aspiring Communities
♦ Active and strong
communities
♦ Children and young people
experience the best start in
life
♦ Inclusive, growing and
enterprising local economy
♦ Residents and communities
enjoy life-long health and
wellbeing
♦ Residents and Communities
are safe
Inspiring Place
♦ Well connected with
effective infrastructure
♦ Homes the meet residents’
needs
♦ Vibrant, welcoming and
attractive environment
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that
puts residents and
communities at the heart of
what we do
♦ An efficient Council that
maximises resources and
provides value for money
♦ A valued workforce that
delivers high quality services
♦ A powerful and respected
voice   
106

Page 107

Page 4 of 22 
Aspiring Communities – Key
Activities
Active and strong communities
Community Investment Fund
Cabinet approved the award of £45,000 of the
Community Investment Fund (CIF) to the Three Towns
Locality Partnership in conjunction the Community
Housing Advocacy Project (CHAP).  The award will
support the recruitment of a new community
outreach worker to support access to financial
services and advice to those residing in the Three
Towns who are struggling with the cost of living.  
£100,000 of funding was approved by Cabinet to
support a £600,000 3G football pitch at Winton Park
in Ardrossan through the Ardrossan Community
Sports Hub (ACSH).  The funding will help secure
further investment in the project.   
Participatory Budgeting
Funding bids for the two streams of participatory
budgeting closed in February.  Local groups across
North Ayrshire could apply for funding for locality
projects (up to £1,000 per project), or arts and culture
projects (up to £400 per project) with decisions made
by the community.
9,357 votes were received from across all six localities
and 128 community groups were successful in their
bids.  Each will receive a share of £109,777 provided
jointly by our Council and the Health and Social Care
Partnership.  A summary of the participatory
budgeting results can be found on our website.
Our Young People’s Participatory Budgeting Initiative
in December 2022 ensured 4,131 young people cast
three votes each for projects across our localities via
the online Young Scot’s voting platform or through
our schools and youth centres.  This resulted in nearly
100 youth projects receiving a proportion of £56,000. 
A full list of the winning projects can be found on our
website. 
Community Planning
The Community and Locality Planning Conference
took place on Saturday 28th January 2023 – the first
held since the Covid-19 pandemic.  Focussing on
community impact and placemaking, it attracted 70
attendees and positive feedback.   
To support a new approach to Locality Partnership
meetings, workshops have taken place with Elected
Members and senior officers to progress new
guidance and agenda formats.   
Islands Recovery and Renewal Pilot project
Significant progress has been made on the delivery of
the ten year local Island Plans launched in March
2022.  Developed with and for our island
communities, these aim to drive the development of
community, economic and environmental wellbeing. 
This includes: 
• Formation of Island Plan Delivery Working Group;
• Development of the North Ayrshire Islands Skills
Initiative Fund;
• Establishment of the Arran Housing Task Force;
• Delivery of the Cost Of Living Crisis Emergency
Fund; and
• Securing funding to support the delivery of Island
Plan actions with partners. 
Children and young people experience the
best start in life 
Child Poverty and Cost of Living Board
Our £1.4 Early Intervention Fund was approved by
Council in March 2023.  This consolidates some
previous funding such as the Cost of the School Day
Fund to more effectively deliver the work of the Child
Poverty and Cost of Living Board.  
Our Child Poverty and Cost of Living Board introduced
mini enquiries to inform how we address child poverty
in North Ayrshire.  Between October and March
representatives from our communities and
Community Planning Partners shared real lived
experience which directly informed our Child Poverty
Action Plan 2023-26 and Council Plan 2023-28.  These
will continue to inform the delivery of the Early
Intervention Fund.   
Tackling child poverty themes covered so far include:
• No Wrong Door Mini Public Enquiry - 5th October
2022 at the Redburn Community Centre, Irvine.  
107

Page 108

Page 5 of 22 
• Employability Mini Public Enquiry - 28th
November 2022 at Whitlees Community Centre,
Ardrossan.
• Food Mini Public Enquiry - 11th January 2023 at
the Volunteer Rooms, Irvine.  
• Islands – Arran Mini Public Enquiry - 13th
February 2023 at the Ormidale Pavilion, Brodick
and Cumbrae Mini Public Enquiry - 20th February
2023 in Garrison House, Cumbrae.  
Due to the varying challenges our islands face, over
£60,000 has been awarded to North Ayrshire through
the Scottish Government’s Island Cost Crisis
Emergency Fund.  It has been identified that those in
our island communities are facing steeper price rises
than those living on the mainland.  The award will be
available as follows:
♦ £30,000 to support third and voluntary sector
work on Arran and Cumbrae.
♦ £15,000 for additional study support for pupils in
Arran and Cumbrae and Largs Academy.  This
funding will also go towards family support
initiatives and visiting specialists to ensure that
children receive well-rounded and meaningful
experiences.
♦ £10,000 will support our Council’s Energy Smart
initiative helping support the improvement of
energy efficiency in homes and ultimately,
reducing the cost to our residents.
♦ £10,000 to support the Money Matters Service in
assisting access to benefits for our residents.   
The Promise
Our first Annual Promise Conference with Care-
Experienced Young People, senior leaders from across
the Community Planning Partnership, Scottish
Government officials including the Minister for
Children and Young People, and the Chief Executive
Officers of The Promise Scotland and Children’s First
was held on 4th November 2022.  This was the first
conference of this kind in Scotland.  130 people
including 23 carers and care-experienced young
people attended the conference.  The event was
chaired by two of our care-experienced young people. 
The themes of the conference were Relationships,
Voice and the United Nations Convention on the
Rights of the Child (UNCRC), and Whole Family
Support. 
Lockhart Campus Official Opening
Lockhart Campus held an official opening day on 27th
January 2023.  The new £20million Additional Support
Needs (ASN) School opened in August 2021 however,
due to the COVID-19 pandemic, no celebration to
mark the opening took place at that time.  Our young
people and teams delivered a music-filled afternoon
for invitees. 
Holiday Meal Programme
At the beginning of March, Cabinet approved a plan to
provide residents eligible for free school meals with a
direct cash payment rather than vouchers over the
Easter Holidays.  It was arranged for families to
receive the cash payment directly into their bank
account and was the equivalent of the cost of a school
meal per day.  We introduced the cash first approach
to provide families with more flexibility and better
value for money.  It also provides a more consistent
method for parents and carers where other supports
are already processed in this way.  Community
volunteers agreed to support an extensive food and
activity programme. 
108

Page 109

Page 6 of 22 
Free Bus Travel Scheme
18,962 National Entitlement Cards (NEC) and Young
Scot NECs have now been used to take part in the
national free bus travel scheme across North Ayrshire
- the third highest uptake across all 32 Scottish local
authorities.  Anyone aged between five and 21 years
old living in Scotland is eligible to use the scheme. 
Outdoor Learning
After the success of our outdoor literacy project ‘Go
Wild!’, the project has been extended to a further six
schools (12 schools participate in total).  Developed in
partnership with our Council’s Literacy Officer, the
aim of the project was to provide a programme of
outdoor learning opportunities encompassing literacy
that can be delivered by teachers.  Twilight ‘Go Wild’
sessions have been delivered by the Ranger Service
with another scheduled for May 2023.  A full day
session was delivered at Whiting Bay Primary School.  
An additional 13 schools are now looking to take part
in the project over the 2023/24 academic year.   
Inclusive, growing and enterprising local
economy
Community Wealth Building
We held Scotland’s first Community Wealth Building
(CWB) conference at Saltcoats Town Hall in October
2022 where over 100 stakeholders from across
Scotland attended including the Minister for
Community Wealth and Public Finance.
In February 2023, a Regional Economic Strategy for
Ayrshire with a CWB approach was approved by the
Ayrshire Economic Joint Committee.  
In March 2023, the CWB Commission was attended by
the Minister for Community Wealth and Public
Finance to discuss the Scottish Government’s CWB
Legislation Consultation
Also in March 2023, the first in-person meeting was
held for the Ayrshire Growth Deal CWB programme at
Ayrshire College, Kilmarnock.  100 attended and a
range of speakers presented including Ayrshire
businesses who have been supported by the
programme.   
Visitor Economy
Throughout 2022/23 we continued to support the
visitor economy sector to manage the impact of the
post Covid domestic tourism increase.  We
implemented our 2022 Visitor Management Plan for
the peak tourism season through coordinating and
increasing our focus on management of place assets
to maximise the experience for our visitors.  This
ensures our businesses get the benefit from increased
domestic tourism, while minimising impacts on
communities. This delivered over £2m investment in
support tourism. 
Procurement
Since October 2022, 20 Community Benefit wishes
have been delivered as part of our ongoing
“Community Benefits Wishlist”.  Community groups
can request donations or time from local suppliers
and can register ‘wishes’ for their communities via 
the online Wishlist Portal.  As at March 2023, there
are:
♦ 43 groups registered on the list.
♦ 91 wishes live.
♦ 2 wishes in discussion.
♦ 4 wishes in progress. 
Employability and Skills
During 2022/23, Employability and Skills ‘Step into
Business’ programme enabled 11 parents to complete
a PC Passport qualification leading to paid work
experience and the opportunity to complete an SVQ
Level II in Business Administration within an anchor
institution such as NHS Ayrshire and Arran, Ayrshire
College, Scottish Fire and Rescue and The Adolescent
and Children’s Trust (TACT).
To target school and college leavers, a careers event
attracted 30 employers and 400 young people.
Our Council embarked on a partnership with Ayrshire
College and the University of the West of Scotland
offering employees the opportunity to complete
qualifications whilst in work.  20 employees are being
supported to complete qualifications ranging from
SVQ Level II to degree level.
To support income from employment as a key driver
out of poverty, an Employability Child Poverty Action
Plan was created in order to help support parents in
109

Page 110

Page 7 of 22 
increasing their household income via gaining
employment or progressing with existing
employment.
The North Ayrshire Local Employability Partnership
launched a Corporate Parenting Action Plan to
increase fair work outcomes for care-experienced
young people.
To date, 36 people have been recruited to the
Streetscene Environment Skills Training Academy all
of whom are supported to gain qualifications while
working and earning the Living Wage as an employee
of North Ayrshire Council. 
Fair Employment
During 2022/23, the Fair Work Ayrshire Team has
engaged with 236 businesses. With 44 Ayrshire
businesses referred to secure real living wage
accreditation, 54 referred to secure disability
confident accreditation, and 43 referrals to Carer
Positive Scotland.   
Equal Programme Jobs Fair
Along with the Local Employability Partnership and
supported by Your Next Move - Working North
Ayrshire, the Equal Supported Employment
Programme arranged a jobs fair with a difference at
Lockhart Campus in February 2023.  Rather than a
traditional arrangement where jobseekers enter a
room of employers arranged in tables to see what
jobs are available, the aim was more of a ‘talent
showcase’ where employers toured the room of
potential candidates, gaining the opportunity to have
a coffee and more informal discussion.  At the fair, 20
residents with disabilities discussed their skills and
experienced with potential employers which resulted
in nine formal interviews, five work trials and three
job offers. 
Residents and communities enjoy good,
life-long health and wellbeing 
Active Schools
In partnership with North Ayrshire Young Carers
Team, Active Schools provided a variety of sport and
physical activity for young people and their families
attending the Young Carers Event.  This provided a
forum for discussion on barriers to participation in
sport where resources could be best focused.  
A Care Experience Event was also held in partnership
with the Corporate Parenting Team where Active
Schools delivered sport and physical activities that
young people could participate in with their parent or
carers.  This was another opportunity to provide
support and remove barriers to participation in sport
and physical activity across North Ayrshire.
Residents and communities are safe
Flood Risk Management
The second Ayrshire Flood Risk Management Plan has
been published.  The plan highlights areas across
Ayrshire that may be more susceptible to flooding.
The plan details the responses needed now to
alleviate future problems and empowers residents
with the knowledge to better protect themselves and
their properties.   
Millport Coastal Flood Protection Scheme
Work to start the £48million coastal flood protection
scheme for Millport has begun, with 80% funded by
the Scottish Government.  The project became
operational in 2021 when the detailed design
development started, with construction commencing
in March 2023.  The project end date is estimated to
be Autumn 2024.   Sheltered waters provided by the
completion of the offshore breakwaters will allow for
the construction of a step ashore marina. 
110

Page 111

Page 8 of 22 
Aspiring Communities – Case Study
North Ayrshire Island Skills Initiative (NAISI)
Arran and Cumbrae now have their own 10-year Strategic Local Island Plans and a dedicated Senior Islands Officer to
test new ways of working across stakeholders, whilst contributing to the delivery of the strategic objectives of the
Scottish Government’s National Islands Plan and principles of Community Wealth Building.  Through ongoing
engagement with our island communities on the Isles of Arran and Cumbrae, the following areas were repeatedly
highlighted as areas of concern:
♦ Economic growth, investment, and sustainability
♦ Community capacity and empowerment
♦ Education and skills and retention of young people
♦ Population and depopulation
♦ Recruitment and retention of employees 
We secured £80,000 of Scottish Government funding to develop and deliver a small-scale pilot and bespoke ‘North
Ayrshire Islands Skills Initiative’ (NAISI) project to support education and skills interventions on the islands of both
Arran and Cumbrae.  
The North Ayrshire Islands Skills Initiative (NAISI) ran from January – March 2023.  The fund was open to individuals,
up to the value of £1,500 and groups, businesses and partnerships up to the value of £10,000.  A grants application
process distributed skills development grants to seven island-based individuals and 19 island-based business in Arran
as well as six island-based businesses in Cumbrae, supporting a total of 32 skills initiatives.
The successful applications included a range of training interventions retaining young people and services on the
island.  This included training in veterinary nursing, paddleboarding, accountancy and MOT testing.
Feedback from skills fund beneficiaries include:
“It has helped by retaining a school age leaver and enabled him to develop further skills that not only allow our
business to explore new growth opportunities but also provided this individual with skills for life which he can use in
future employment.  This has resulted in the individual remaining on the island as appose to leaving to seek
employment on the mainland”.  
“This improves the likelihood of a vet surgery on Arran which is essential to community and island economy”.
“The good news is he passed his MOT Testing with flying colours!!  This gives us more flexibility within the business
and helps us to retain a young member of staff who appreciates the chance to receive this extra skill and deliver this
service on the island”.
This initiative supported the resilience of the island’s economy post-pandemic, whilst driving economic growth for
the future.
It is anticipated that this pilot will contribute to the sustainability of our islands.  The outcomes from this exclusive,
island pilot will inform the wider Ayrshire Growth Deal investment and Ayrshire Skills Investment Fund.  These have
inclusive economic growth as the key driver to tackle inequality, grow local talent, create new connections and
provide new opportunities and employment for people across our region including rural and island localities. 
111

Page 112

Page 9 of 22 
Inspiring Place – Key Activities
Well connected with effective
Infrastructure
Local Development Plan
The third Local Development Plan (LDP3) process
began in March, with a new online hub developed to
support the plan’s creation.  The hub outlines the
process involved in the creation of LDP3 and provides
the opportunity for residents to voice their views on
the future of their surroundings.  The first phase of
developing the plan runs until June 2023 and we aim
to adopt the plan in Summer 2026.  LPD3 will be the
framework from which all planning applications are
assessed for the following decade. 
B714 Upgrade
Following confirmation of the £23.7m award in
October 2021 from the UK Government's Levelling Up
Fund, we have continued to progress the design and
business case for the project.  Extensive consultation
has been undertaken with landowners and a broad
range of stakeholders. This included a public
consultation and exhibition in November and
December 2022 on the preferred option. Detailed
ground investigations and surveys including
environmental and ecological surveys are also
underway. The feedback and information obtained
from this process will inform the Business Case and
design development. Targeting submission to the UK
Government for approval in Autumn 2023. This
project is match funded by a £3m award from our
Council's Investment Fund. 
Ayrshire Growth Deal 
We have made progress on several of our Ayrshire
Growth Deal Projects. We have: 
• Completed our full business case for the i3
Flexible Space and Digital Process Manufacturing
Centre at i3 Irvine.
• Made our Digital Process Manufacturing Centre
building suitable for occupation.
• Secured partnership of National Manufacturing
Institute Scotland and University of Strathclyde as
having a presence as lead operator of a national
innovation centre for manufacturing.
• Launched consultation on the Irvine Harbourside
masterplan, which is key moving into delivery of
the Ayrshire Growth Deal (note in current
financial year we have appointed designers for the
regional play park/coastal hub which will be the
first delivery phase).
• Developed academic partnerships with University
of Stirling to support our blue economy ambitions
through the International Marine Science Centre
project and Hunterston.
• Continued development of our partnership with
Crown Estate Scotland, particularly to support
development of marine tourism projects.
Homes that meet residents’ needs
Strategic Housing Investment Plan
Our Council Strategic Housing Investment Plan (SHIP)
2023-2028 was approved by Cabinet in November
2022 and supports the Scottish Government’s
Affordable Housing Supply Programme (AHSP).  Both
the SHIP and AHSPs aims are to deliver affordable
housing for rent for our residents across North
Ayrshire and support our Council’s Regeneration
Delivery Plan to implement regeneration across sites
including town centres.  
At the beginning of 2023, work began on a new
housing development at Afton Court, Stevenston.  The
£1.3million development - with £600,000 of Scottish
Government funding - is expected to be completed by
late summer 2023 and will create six new amenity
bungalows delivered by a modular construction
method.  The bungalows will be built in a controlled
factory environment using sustainable practices
reducing waste and energy required.  Kitchens,
bathrooms, plumbing and electrics will all be installed
in the factory before the bungalows are transported
to site and moved into position.  Tenants of the
bungalows will benefit from the modern, energy-
efficient homes owing to the ultra-insulated building
envelope and the installation of air-source heat
pumps and photovoltaic (PV) panels.  
14 new homes will be built at sites as part of our
Estates Based Regeneration Programme.  The draft
plans were available online for our residents to
comment on and a consultation event was held in
Kilbirnie in February.    
112

Page 113

Page 10 of 22 
Irvine & Kilwinning
35 of the 71 units at Irvine Harbourside were
complete as at 31 March 2023 with the remaining 36
homes due to be provided to tenants during April
2023.   
The 79 homes at St Michael’s Wynd in Kilwinning
were completed during September 2022.  These
include general needs, amenity, wheelchair user
housing, sheltered housing and supported
accommodation. 
Arran Housing Task Force
In March we established our Arran Housing Task Force
as part of our Arran Island Plan commitment which
incorporates a wide range of partners aiming to find a
long-term resolution to the island’s housing
challenges.  Details of the demand for affordable
housing on the island – both location and type - will
be identified, as well as barriers to economic
sustainability and growth.
Vibrant, welcoming and attractive
environment
Moorings
We have agreed a three-year contract to install,
maintain and repair the visitor moorings at Arran and
Cumbrae.  Available throughout the season (April –
October) and located at Millport, Brodick, Lochranza,
Pirnmill and Whiting Bay, visitors can berth for up to
three nights on a visitor mooring at these locations,
with longer stays available at Lamlash, Largs, Fairley
Quay and Clyde Marina.  The development will attract
tourism to our island communities throughout the
warmer months and will enable visitors to stay and
enjoy our area.   
Millport Town Hall  
Renovation works to improve and restore the 144-
year-old Millport Town Hall building have begun. 
Funding for the project for Phase One was secured in
2021 with £1.865 million sourced from the Scottish
Government's Regeneration Capital Grant Fund
(RCGF), and a further £200,000 in Community
Investment Funding awarded by our Council and the
North Coast and Cumbraes Locality Partnership in
addition to £15,000 from the North Ayrshire Ventures
Trust (NAVT).   A further award of £0.509m was
secured from the Scottish Government's Islands
Programme for Phase Two of the project.  The
Millport Town Hall Charity has also raised £537,710
over the lifespan of the project which is a key example
of a locally led regeneration project.   
Capital Investment Programme
A £434million Capital Investment Programme has
been approved by Cabinet and will play a key role in
the economic recovery of North Ayrshire in response
to the cost of living crisis.  The investment will be
delivered over the next decade and the projects
covered by the investment will include:
♦ The Millport Flood Protection Scheme.
♦ Expansion of universal free meals in schools.
♦ The upgrade of the B714.
♦ Ardrossan Community Campus.
♦ Montgomerie Park Primary School.
♦ The solar PV farms at Shewalton and Nethermains
in Irvine.
♦ The decarbonisation of our Council’s transport
fleet.
♦ Street lighting.
♦ Playparks.
♦ Our cycling, walking, and safer routes programme. 
Inflation and increased costs have made it challenging
to manage the capital budget.  All projects are
approached with a focus on protecting the
environment and supporting our goal of becoming a
carbon-neutral council.     
Regeneration Delivery Plan
We developed and delivered Year Two of our
Regeneration Delivery Plan, focusing on the delivery
of physical regeneration across North Ayrshire
through an ambitious project based rolling action
programme. This was delivered using funding secured
from a range of sources including: 
• Scottish Government’s Place Based Investment
Programme: £1.093m 
• Scottish Government’s Vacant and Derelict Land
Fund: £1.32m 
• Scottish Government’s Vacant and Derelict Land
Investment Programme: £0.4m 
• Scottish Government’s Cycling Walking and Safer
Routes: £0.86m
• Strathclyde Partnership for Transport Capital
Programme: £1.385m
• Scottish Government's Islands Programme
£1.229m
113

Page 114

Page 11 of 22 
A sustainable environment  
Solar PV Farms
We have awarded the tender to deliver two Council-
owned solar farms.  The £12.8million project will see
the former landfill sites at Nethermains in Kilwinning,
and Shewalton in Irvine transformed into two solar
farms.  The detailed design phase is underway and
works are scheduled to start on-site early in the new
year.   The transformation to a source of green energy
use as part of our Council’s Environmental
Sustainability and Climate Change Strategy will see
sterile land brought back into productive use and
provide a significant amount of energy and income
that can be reinvested in the area.   
Community Renewable Energy Generation Funding
Scheme
We have established a Community Renewable Energy
Generation Funding Scheme (CREGFS).  The scheme
empowers communities to undertake renewable
energy initiatives.  It will enable community groups to
contribute to the net zero emissions by our 2030
commitment and accelerates community benefit from
local renewable energy generation.   
Lochshore Hub
The formal opening of our £4.2million Lochshore Hub
took place in October 2022, attracting approximately
1,000 attendees with a free family fun day.  The Hub
was funded by a range of sources including Scottish
Enterprise, Garnock Rugby Club, the Nuclear
Decommissioning Authority, the Scottish
Government’s Regeneration Capital Grant Fund and
Vacant and Derelict Land Fund. 
The preparation for planting 12 hectares of new
woodland at Lochshore, Kilbirnie, began in February
2023.  Following extensive groundworks, 17,000 trees
will be planted with the species being informed by the
ground conditions at the planting site.  A community
woodland area will be created, planted and managed
by the community.  The entire project aligns with our
Council’s ambition to achieve net zero carbon
emissions by 2030 which includes planting over
100,000 trees across North Ayrshire (over 35,000 new
trees have been planted to date).   
Electric Vehicle (EV) Charging Infrastructure
From October 2022 to March 2023 the following
publicly accessible charge points were installed:
♦ Skelmorlie Community Centre – 1 x 50Kw EV
Charge Point.
♦ Lockhart Additional Support Needs Campus – 1 x
7Kw EV Charge point.
♦ Clockhouse Car Park, Lamlash – 1 x 50 kw EV
Charge point.
♦ Arran Outdoor Education Centre – 2 x 7Kw EV
Charge points.
In addition, Cabinet approved the progression of an
Inter-Authority Agreement with East and South
Ayrshire to oversee and implement the expansion of
the public vehicle charging network across Ayrshire. 
The project will involve private sector investment and
grant funding from the Scottish Government to
deliver a total of 433 charging points across Ayrshire –
150 in North Ayrshire alone.   
114

Page 115

Page 12 of 22 
Inspiring Place – Case Study – Regeneration Delivery Plan 
The Regeneration Delivery Plan approved in March 2021 is informed by stakeholder consultation and community
priorities.  It aims to address local priorities, support changes within communities and deliver a wellbeing economy.
The Plan focusses on the delivery of physical regeneration across North Ayrshire and informs our priorities for
securing and delivering against external funding sources including Scottish and UK Government funds.  Action in
2022/23 focussed on maximising the impact and leverage of investment and accelerate delivery.  This includes
funding to support community led delivery.
The Action Programme is aligned to the four themes of the Delivery Plan which align with and deliver across our
Council Plan priorities. Key successes include:
Strengthening Communities
• Approval of the local delivery plans for the £1.32m annual allocation from the Scottish Government’s Vacant and
Derelict Land Fund (VDLF).
• Launch of the Repurposing Property Grant Fund to support landowners and communities to bring vacant and
derelict land and properties into positive management including two rounds of awards. 
• Conclusion of the sale of Sites A and B at Montgomerie Park, Irvine to enable the delivery of the Simplified
Planning Zone and commencement of construction.  Commencement of next phases including proposals for
neighbourhood retail site development.
Placemaking
• Approval of the delivery plan for the £1.096m allocation from the PBIP including implementation of the Place
Framework pilots in Kilwinning, Largs, Saltcoats and Lochshore Park. 
• Working in partnership with Ardrossan Community Development Trust to successfully secure £0.749m from the
Regeneration Capital Grant Fund (RCGF) for Ardrossan Promenade. 
• Completion and launch of key Phase 1 projects for the Lochshore Park Masterplan including the Hub building
and active travel route.  Commenced construction on the 5km loop and play at the Hub and secured £0.1m
funding from Forestry and Land Scotland for the delivery of new woodland.
Inclusive and Green Economy
• Design development and tender of Phase Three of Pavilion development at Annickbank, Irvine including securing
£0.25m from North Ayrshire Ventures Trust and £0.4m from the Scottish Government’s Vacant and Derelict Land
Investment Programme (VDLIP) towards the construction.
• Design development for the next phase of industrial unit development at Kyle Road, Irvine.
• Securing £0.509m from the Scottish Government Islands Programme for Phase Two of Millport Town Hall and
£0.540m for the Islands Pit Stop project.
Enabling Infrastructure
• Securing £1.385m from Strathclyde Partnership for Transport’s (SPT) Capital Programme for the delivery of a
range of active travel and transport projects across North Ayrshire.
• Securing £0.124m from the Smarter Choices Smarter Places for the continued delivery of the Trinity Active Travel
Hub and Travel Smart programme.
• Development and delivery of a £0.86m programme of active travel design and works under the Scottish
Government’s Cycling, Walking and Safer Routes programme.
A draft action programme is being prepared for 2023/24 and 2024/25 to align priorities with resource. This will be
informed by an assessment of progress to date, local priorities, project deliverability and funding. The
implementation of action programme projects aligned to competitive funding sources will however be dependent on
the success of the funding applications.
115

Page 116

Page 13 of 22 
A Council for the Future – Key
Activities
An accessible Council that puts residents
and communities at the heart of what we
do
Budget and Council Plan Consultations
1,400 residents completed the 2023/24 Budget
Engagement Survey in January 2023 in addition to in-
person events held across North Ayrshire’s six
localities attracting 37 community groups.  Our
residents were asked to rate services in order of
importance, provide their views on schools and
nurseries and offer opinions about our towns and
surrounding areas.  
These consultations informed our budget and the
development of our Council Plan 2023-28 priorities,
alongside real lived experience captured through the
Child Poverty and Cost of Living mini-enquiries and
other recent consultations for areas such as our
Community Plan and HSCP Strategic Plan.
Accessing Our Council and No Wrong Door
Our Accessing Our Council programme has continued
to progress.  Focus has been on our digital services,
with the review of our frequently used online
processes to identify and implement improvements
ensuring a streamlined customer journey across
services.  Phase One which rationalised the contact
details for our Council is complete, resulting in a
significant reduction in public facing telephone
numbers and email addresses on our website.  
The next phase of the project is focusing on the
implementation of the new Customer Services Digital
Team, the launch of the new Contact Us process for
contacting Council services, the new My NAC online
account and progressing our locality-based in-person
service provision.  
Accessing our Council contributes to a wider area of
work around ‘No Wrong Door’ where no matter how a
person contacts our Council, they are guided to
relevant support.  This approach is currently in
development, with an awareness raising campaign
due to begin in June 2023.  It has been directly
informed by the real lived experiences of our
residents and information from partners through our
No Wrong Door Mini Enquiry in October 2022. 
An efficient Council that maximises
resources and provides value for money
Council approved our budget on 1st March which has a
clear focus on ways to mitigate the impact of the cost
of living for our residents.  It was agreed that
£3.3million would be used to reduce the impact of the
rising cost of living for our residents by capping the
increase on council tax and making this significantly
lower than inflation.   In addition, our Council will
further invest in its Energy Smart Programme.  The
programme was put in place to help residents source
assistance with lowering their energy bills during the
winter (see Aspiring Communities section above).
Roundabout Advertising
The first year of advertising on roundabouts across
North Ayrshire has been positive.  Of the 24
roundabout locations initially granted planning
consent, 23 locations were sold within one week of
release.  £20,000 of income per year is generated by
this initiative.  28 locations have now been granted
planning consent.  The initial agreement period
extends to September 2024.
A valued workforce that delivers high
quality services
Best Value Thematic Approach
We have been supporting our annual Best Value
Thematic Approach Audit.  This is a new approach to
auditing Best Value and replaces the five yearly Best
Value Assurance Audit.  This thematic approach
focusses on a specific area each year in addition to our
standard annual audit by our external auditors, Audit
Scotland, on behalf of the Accounts Commission. 
2022/23 is being audited on the theme ‘Leadership of
the development of new local strategic priorities’ and
is looking at the development of our new Council Plan
2023-28 following the Local Government elections in
May 2022.  A report on findings is expected in
November 2023.
Education Scotland Inspection
Ardeer Primary and Early Years Establishment
received a positive report with ‘effective teamwork’ in
place to support staff and children at the
establishment praised.  The inspection was carried out
116

Page 117

Page 14 of 22 
by Education Scotland in December 2022 and found
many strengths within the school and early years
classes in their approach to raising attainment.  It was
noted that Pupil Equity Funding (PEF) was effectively
utilised to support pupils at all levels across the school
allowing gaps in learning to reduce and progress to be
made on prior levels of attainment.  The inspection
report can be read here.  
Modern Apprenticeship Programme
Our Council has been delivering its Modern
Apprenticeship Programme, one of the largest local
authority modern apprenticeship programmes in
Scotland, for 12 years.  The programme has
undergone a review to determine its future scale and
funding.  The review has provided an opportunity to
consider a wider range of apprenticeships such as
Foundation Apprenticeships, Modern Apprenticeships
and Graduate Apprenticeships all supporting
vocational based learning (Scottish Vocational
Qualifications up to SCQF Level 9) with the framework
being used to develop the existing workforce. Updates
to the programme will be implemented from April
2023.  
Our ambition is to continue to provide and recruit 50
apprenticeships each year which comprises of new
and existing employees, with 20% of places on the
Modern Apprenticeship Programme ringfenced for
residents with a disability or who are care-
experienced.  The programme is developed in
conjunction with Ayrshire College.   
For existing employees, Graduate Apprenticeships will
support workforce development in partnership with
the University of the West of Scotland as a pilot and
will focus on the qualifications of BA (Hons) Business
Management, BEng (Hons) Civil Engineering, BA Early
Learning & Childcare, BEng (Hons) Engineering Design
& Manufacture, BSc (Hons) IT: Software Development. 
Foundation Apprenticeships will be developed
alongside Education, Ayrshire College and local
businesses.  
Equality and Inclusion
In March 2023, we completed our Equality
Mainstreaming Report 2020-22 and Outcomes 2021-
25 Mid-Term Report which was approved by Cabinet
in May 2023.  Local Authorities are required to
produce equality information once every two years
under the Equality Act 2010.  A selection of the key
highlights for 2020-22 are:
♦ British Sign Language video landing page on our
Council’s website.
♦ The creation of a Black and Minority Ethnic
(BAME) pan-Ayrshire Employee Forum.
♦ New guidance on Menopause in the Workplace.
♦ Introduction of an online Equality and Children’s
Rights Impact Assessment training module.
117

Page 118

Page 15 of 22 
♦ Our overall mean Gender Pay Gap has reduced to
0.22% (1.19% in 2021).
♦ Connected Communities successful achievement
of the Silver LGBT Charter Mark.
Pregnancy Loss
To provide an environment where colleagues can
discuss and be supported with pregnancy loss, we
signed up to the Pregnancy Loss Pledge and
introduced our new Pregnancy Loss guidance in
October.  This guide will help our managers provide
practical and emotional support to all our employees
affected by all forms of pregnancy loss.
Gambling Charter
Our Council has signed up to the Gambling Charter so
that it can best support and help our workforce to
manage issues caused by gambling.  The Gambling
Workplace Charter was developed by Trade Unions as
a way of helping support those facing difficulties
caused by gambling.  Our Council already provides
employees with a variety of health and wellbeing
support through its LiveWell programme and this will
add another element of support to those struggling
and who may have found it difficult to reach out for
help with gambling.   
Our Gambling Related Harms in the Workplace Guide
provides information on support available, including,
but not limited to, our ‘Wellbeing Warriors’ who are
available to talk things through with employees and
the Money Matters team who can provide financial
advice.
Recruit with Conviction
Our Council has received Recruit with Conviction
Ambassador status.  In association with ‘Recruit with
Conviction’, the Ambassador status acknowledges our
efforts to provide safe and sustainable employment
for those with current or historical criminal
convictions.  It ensures our applicable policies and
procedures are current and proportionate and do not
exclude the best candidates from gaining employment
with us. 
A powerful and respected voice 
Carers
Our Council has been recognised by Carers Scotland as
a Carer Positive ‘Exemplary’ employer in Scotland. The
award demonstrates the support our Council provides
for its employees who are working carers, through a
combination of practical support and policy,
awareness raising, training and an active Carers
Network. 
The ‘Exemplary’ Level Three Award is the highest
accolade given to organisations who go above and
beyond in their caring commitments to colleagues and
who demonstrate innovative and creative approaches
to supporting and involving carers across their
organisation. 
The Carer Positive initiative fits with aspirations to
promote fairer working practices and is highlighted as
an example of best practice. It enables the Council to
self-assess working practices against the principles
and criteria of creating a healthy and safe
environment, where an individual’s wellbeing is
actively supported, enabling a good work-life balance
as well as creating a more diverse and inclusive
workforce.
118

Page 119

Page 16 of 22 
Performance Summary 
Where performance indicator information is pending, the most recent status up to
2021/22 year end is used.  Indicators and actions adrift of target and not previously
reported are detailed on the next page. 
Aspiring Communities
♦ Active and strong communities 
♦ Children and young people
experience the best start in life 
♦ Inclusive, growing and
enterprising local economy 
♦ Residents and communities
enjoy good life-long health and
well-being 
♦ Residents and communities are
safe 
Inspiring Place
♦ Well connected with effective
infrastructure
♦ Homes that meet residents’ needs
♦ A vibrant, welcoming and attractive
environment
♦ A sustainable environment 
A Council for the Future
♦ An accessible Council that puts
residents and communities at
the heart of what we do
♦ An efficient Council that
maximises resources and
provides value for money
♦ A valued workforce that delivers
high quality services
♦ A powerful and respected voice
Legend 
On Target / Complete
Slightly Adrift of Target
Significantly Adrift of Target
Status Unknown / Data Only
1
33%
2
67%
Performance Indicators
5
100%
Actions
15
83%
1
6%
2
11%
Actions
13
76%
1
6%
3
18%
Performance Indicators
13
81%
3
19%
Actions
3
23%
7
54%
3
23%
Performance Indicators
119

Page 120

Page 17 of 22 
Performance Indicators Adrift of Target
This section details the performance indicators adrift of target and the action being taken to address performance. 
Due to expected data lags the most recent data may relate to previous time periods but may only now be available
to report.  To avoid duplication, only data that has not previously been reported to Cabinet is included in this
section.  
Significantly Adrift of Target - CP_03 % of residents who agree they have access to opportunities to participate in
their local community.
The percentage of residents who agree they have access to opportunities to participate in their community from the
2022/23 People’s Panel survey is 36%.  This is below the target of 47%.  It should be noted that the People’s Panel is
used to collect data around a small representative group of resident’s opinions and experiences. However, from
supplementary data we know that in the final quarter of 2022/23 5,169 adults engaged in Community Learning and
Development activity with locality and thematic teams.  Activities delivered and supported includes Men's Shed,
adult literacy/numeracy/employability support, recovery/addiction groups, café solace, environmental groups,
mental health and wellbeing groups, fairer food groups, New Scots community hubs, community-based organisation
boards/committees, ESOL delivery, Community Councils, Community Associations, groups to support the voice of
older people and Gaelic. In addition, there has been a wide variety of group work activity with 2,628 young people
participating in activities including youth council, transition work, junior youth groups, Arran Outdoor group work
and work around mental health and wellbeing. The Council and partners, including the Third Sector Interface,
continue to ensure engagement with and support for residents and communities to become involved in local
activities. 
Significantly Adrift of Target - CP_25 % of Council dwellings that meet the Scottish Housing Quality Standard
(LGBF)
The change in regulations which reduced the testing period for electrical testing from every 10 years to every five
years has impacted on the reportable Scottish Housing Quality Standard (SHQS) figures.  Prior to this change we
were reporting an SHQS figure of 97.4% in reporting year 2020/21.   This dropped to 49.3% in 2021/22 due to the
number of properties which immediately fell outside the five-year testing period as a result of the reduced targets
when introduced.  An action plan has been developed and we have implemented several measures to meet the new
targets to ensure we progress towards 100% compliance in this area. 
Significantly Adrift of Target - CP_26 Tourism Visitor Numbers
A regional approach to the Tourism/Visitor Economy has recently been agreed at the Ayrshire Regional Economic
Joint Committee, which together with the established North Ayrshire Local Tourism Forum, will work towards
improving tourism visitor numbers as we continue to recover from the impacts of the pandemic. 
Significantly Adrift of Target - CP_27 Street Cleanliness Index - % Clean (LGBF) 
The Street Cleaning Index score decreased from 2021/22 to 2022/23 (86.7% to 84.6%). Changing demands  on the
service continue to be reflected in adjusted operational arrangements to improve street cleanliness scores.  (Note: 
Previous figure of 89.5% for 2021/22 was a provisional figure based on an audit in late October 2021.  The revised
2021/22 figure of 86.7% is from the most recent Local Government Benchmarking Framework (LGBF) data release. 
However, most recently our Street Cleanliness index is 84.6% as at 2022/23.)
Slightly Adrift of Target - CP_19 Proportion of operational buildings that are suitable for their current use (LGBF)
Projects which will contribute to improving our performance in this area are underway, including the replacement
Moorpark Primary School and forthcoming Ardrossan Community Campus. In addition, rationalisation opportunities
continue to be explored, and it is anticipated that there will be further improvement in the performance of the
operational building estate ahead of the next reporting period. 
120

Page 121

Page 18 of 22 
Slightly Adrift of Target - CP_20 Overall percentage of road network that should be considered for maintenance
treatment
There has been a marginal deterioration in overall road condition with an increase of 0.9% in the percentage of the
road network that should be considered for maintenance treatment.  This is reflective of inflationary pressures
impacting on material and contractor costs. The continued road investment programme is developed to optimise
investment and prioritise works across the network to maintain current road condition.   The approved additional
investment in 2022/23 and 2023/24 will assist in improving the road network performance indicator. 
Slightly Adrift of Target - CP_21 Proportion of properties receiving superfast broadband (LGBF)
LGBF data confirms 94.9% of properties in North Ayrshire are receiving superfast broadband.  This is an increase
from 94.7% in 2020/21.  Though we monitor this indicator, we do not have direct influence over the rollout of
broadband as this sits with the national R100 programme. 
Slightly Adrift of Target - CP_22 Number of electric vehicle charging points publicly available.
This indicator is only one EV charge point from reaching the target (59 against a target of 60) due to elongated 
community engagement to agree an appropriate location. 
The number of publicly available EV charge points within North Ayrshire is 59 (35 owned by our Council and 24
privately owned).  The following new charge points were added: 
• 1 x 50kW at Skelmorlie Community Centre
• 1 x 7Kw at Lockhart ASN Campus, Stevenston
• 1 x 50kW at Clockhouse Car Park, Lamlash
• 2 x 7Kw at Arran Outdoor Education Centre, Lamlash 
Slightly Adrift of Target - CP_23 Number of new build Council housing units reaching completion (cumulative)
The SHIP 2023 – 2028 was approved by Cabinet on 1 November 2022.  As at 31 March 2023, a total of 831 new
Council units have been completed since our development programme commenced. 
We have been monitoring the impact of COVID-19 and inflationary pressures on the SHIP, all of which have created
time and financial impacts, due to labour and material shortages and an increase in material costs.   
Slightly Adrift of Target - CP_31 % of total household waste that is recycled (calendar year as per SEPA) (LGBF)
The household waste recycling rate for the calendar year 2022 was 55.3% compared to a target of 56.9%. As people
continue to work from home, the composition and quantities of domestic waste generated continue to fluctuate.
North Ayrshire Council is one of the highest performing for recycling in Scotland and continuously strives to improve
performance in this area.  A new Zero Waste Strategy is currently being developed, which will include a wide range
of actions to assist in improving performance against this indicator.  
121

Page 122

Page 19 of 22 
Actions Adrift of Target
Within our Council Plan Delivery Plan overall actions are supported by sub actions.  Officers provide an update on
activity and an estimate of the current status (red, amber or green).  Where a sub action is adrift of target (amber or
red) this sets the status of the overall target so that any off-target performance can be highlighted, with significantly
adrift (red) statuses taking priority.  This section highlights the reasons for underperformance within each action and
efforts being made to remedy it.    An overview of action performance can be shown in appendix three of this report. 
CP_05 We will expand our learning and childcare estate, including ensuring all eligible children are able to access 1140
hours of free childcare each year 
CP-SUB-08 Deliver major educational
new build and refurbishment projects
aligned to Scotland’s Learning Estate
Strategy: "Connecting People, Places
and Learning”.
Significant challenges within the construction industry persist, including
programme and budgetary pressures arising from inflation, borrowing costs
and access to labour and materials. This has led to delays on several projects
including Ardrossan Community Campus, Moorpark Primary School and
Marress Early Years Centre. Officers continue to work to keep all stakeholders
updated timeously, mitigate delays as far as possible and complete projects in
line with revised programmes.
All children entitled to 1140 hours of free childcare continue to be successfully
placed within Council and partner provision. 
CP-SUB-09 Develop an Outdoor Play
Strategy to support Early Years
Practitioners to provide excellent
learning and developmental
opportunities.
(Complete – no remedial note required)   
CP_15 We will let people decide how best to manage their own care needs and support people to live in their own
homes for as long as possible 
CP-SUB-31 Re-design Older People's
Services - Home First approach (Complete – no remedial note required) 
CP-SUB-32 Grow Care At Home capacity (On Target – no remedial note required) 
CP-SUB-33 Prioritise Day Services Model
and Support for Carers. (On Target – no remedial note required) 
CP-SUB-34 Prioritise integrated Island
services, including unscheduled care. (On Target – no remedial note required) 
CP-SUB-35 We will help individuals to
have better choice and control of their
support at an early stage by
reinvigorating the HSCP charging policy.
(Complete – no remedial note required) 
CP-SUB-35a We will help individuals to
have better choice and control of their
support at an early stage by
reinvigorating Self-Directed Support.
Phase one of the Self-Directed Support (SDS) Review is complete.  A set of
collective recommendations and actions have been agreed at the final SDS
Learning review Board. Proposals and recommendations have been grouped
under nine themes, a number of actions are in progress as a result and
further engagement is being undertaken with the Partnership Senior
Management Team to consider the priority actions to be taken forward and
resourced into Phase Two.   
122

Page 123

Page 20 of 22 
CP_16 We will work with individuals and communities to support positive lifestyle choices which improve health and
wellbeing. 
CP-SUB-36 We will provide
opportunities for people to be more
active more often, through the Active
Communities Strategy
(Complete – no remedial note required) 
CP-SUB-37 We will work with Scottish
Government as a trailblazer site for the
whole systems approach to diet and
healthy weight (public health priority)
(Complete – no remedial note required) 
CP-SUB-38 Prioritisation of children and
young people receiving support from
Child and Adolescent Mental Health
Services.
(On Target – no remedial note required) 
CP-SUB-39 Prioritise community mental
health services supporting people within
their communities.
(On Target – no remedial note required) 
CP-SUB-40 We will place Mental Health
Practitioners into GP practices to offer
triage calls, urgent and routine face to
face assessments as well as directing
patients to the most appropriate
support without unnecessary referrals
to mental health services.
A Mental Health and Wellbeing in Primary Care Business Case has been
developed.  We cannot progress further until anticipated Scottish
Government funding is allocated.   The service is recognising that funding
may be unlikely to come in the near future and planning for such will need to
be considered.   
CP-SUB-41 We will improve emotional
and mental health and wellbeing
through physical and social
participation in community activities,
including for young people
(Complete – no remedial note required)   
CP_19 We will provide well-maintained, integrated travel and transport networks, supporting alternative and
sustainable transport. 
CP-SUB-50 We will support the
development of the Ayrshire Regional
Transport Appraisal.
Transport Scotland (TS) previously confirmed that the Regional Transport
Appraisal (RTA) would be part of the Strategic Transport Projects Review 2
(STPR2) process.  At this stage, there remains no clarity on the approach to
regionally significant projects. Our response on STPR2 was prepared and
submitted to Transport Scotland in April 2022 which reinforced the points
raised previously, in particular, the Council’s disappointment in the lack of
any North Ayrshire specific interventions and the lack of clarity on the RTA
approach.   
123

Page 124

Page 21 of 22 
CP_26 We will actively promote a mix of homes by facilitating private housing development. 
CP-SUB-67 We will deliver an alternative
affordable housing model – HOME – in
one of our most pressured localities
The financial viability of the HOME model continues to be assessed during
the currently volatile house construction market. A report will be presented
to Cabinet to consider the current position.     
CP_29 We will provide well-kept public places and town centres which will benefit our residents, visitors and businesses. 
CP-SUB-69 We will seek opportunities to
develop affordable housing in our town
centres through our Strategic Housing
Investment Plan
(On target – no remedial note required) 
CP-SUB-70 We will deliver the actions
arising from the Open Space Strategy
and the Litter, Fly Tipping and Dog
Fouling Prevention Strategy.
(On target – no remedial note required) 
CP-SUB-71 We will develop
Decriminalised Parking Enforcement to
manage town centre traffic.
The final Decriminalised Parking Enforcement (DPE) application was
submitted to Scottish Government in line with the formal statutory process
with an anticipated outcome expected to allow the transfer of powers to
North Ayrshire Council in November 2023.   
124

Page 125

Page 22 of 22 
Trend Charts 
Key: 
0
100,000
200,000
300,000
400,000
500,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_15 Number of attendances at
indoor sports & leisure facilities
(Excluding Pools)
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2018/19 2019/20 2020/21 2021/22 2022/23
CP_29 Overall Carbon Emissions
(Tonnes)
0%
1%
2%
3%
4%
5%
2019/20 2020/21 2021/22 2022/23
CP_02 % of Council budget directed
via participatory methods
0
10
20
30
40
50
60
70
2019/20 2020/21 2021/22 2022/23
CP_22 Number of electric vehicle
charging points publicly available
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_31 % of total household waste
that is recycled (Calendar Year as
per SEPA) (LGBF)
0%
10%
20%
30%
40%
50%
60%
70%
2018/19 2019/20 2020/21 2021/22 2022/23
CP_33 % of Self Service
Transactions
125

Page 126

For further information please contact: 
The Corporate Policy, Performance and Elections Team 
Tel: 01294 310000 
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
126

Page 127

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 1 of 6 
Appendix 2 – Council Plan Performance Indicators 
Priority - Aspiring Communities
PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_02 Percentage of
Council budget directed via
participatory methods
1.11% 0.89%  1.13% 1.2%  2.32% 1.1%  2.74% 1% 
CP_03 Percentage of
residents who agree they
have access to opportunities
to participate in their local
community
47% 47%  47% 47%   47%  36% 47% 
CP_04 Percentage of
children achieving their
developmental milestones at
the time the child starts
primary school
N/A 79%  72% 80%  78.5% 78% 
Data
available
in July
2024  
PI Status 
Significantly Adrift of Target 
Slightly Adrift of Target 
On Target 
Data Only 
Data Not Available
127

Page 128

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_05 Average total tariff
score of pupils living in SIMD
30% most deprived areas
685.8 718  744.7 724  720 710 
Data
available
in Feb
2024
TBC 
CP_06 Average tariff score:
All Leavers 857.4 895  912 900  905.6 880 
Data
available
in Feb
2024
TBC 
CP_07 Percentage of school
leavers entering positive
destinations (LGBF)
92.5% 96%  95.2% 96.2%  96% 93.5% 
Data
available
in Feb
2024
TBC 
CP_08 Percentage of
children living in poverty
(after housing costs)
27.9% 26.5%  24.7%* 26.5%  29%  
Data
available
June
2024  
CP_09 Percentage of
working age population in
employment
70.2% 70%  69% 64.7%  66.3% 70%  71.3% 68% 
CP_10a Percentage of
procurement spent on local
enterprises
19.98% 23%  21.39% 23.5%  22.93% 24%  26.04% 25% 
128

Page 129

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_11 Percentage of people
earning less than the living
wage (LGBF)
16% 24%  16.2% 23%  11.7% 22% 
Data
available
in Feb
2024
TBC 
CP_12a Cumulative Number
of unemployed disabled
residents supported
109 100  114 80  135 120  135 120 
CP_12b Cumulative number
of unemployed disabled
residents supported into
employment
18 20  18 16  34 20  36 20 
CP_14 Percentage of
households in fuel poverty 28% 25.5%  28% 28% 
Data
available
2024
28% 
Data
available
2025
TBC 
CP_15 Number of
attendances at indoor sports
& leisure facilities (excluding
pools)
1,859,843 1,964,100  71,913 736,915  298,806   445,115  
CP_16 Percentage of people
aged 65 and over with long-
term care needs who
receiving personal care at
home (LGBF)
69.42% 66%  69.51% 66%  69.6% 66% 
Data
available
in May
2024
TBC 
129

Page 130

PI Code & Description
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_17 Emergency
Admissions (Number) 19,150 20,257  16,283 20,257  17,966 20,257  17,273 20,000 
CP_18 Percentage of new
tenancies to applicants who
were assessed as homeless
sustained for more than a
year
84.07% 82%  92.48% 85%  86.92% 85%  88.38% 86% 
130

Page 131

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 5 of 7  
Priority - Inspiring Place 
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)
90.89% 93%  91.05% 93%  91.1% 93% 
Data
available
in May
2024
TBC 
CP_20 Overall percentage of road
network that should be considered
for maintenance treatment
37.3% 38.1%  37.1% 38.1%  33.9% 37.5%  34.8% 33.8% 
CP_21 Proportion of properties
receiving superfast broadband
(LGBF)
94.1% 97%  94.7% 97%  94.9% 97% 
Data
available
in May
2024
100% 
CP_22 Number of electric vehicle
charging points publicly available 36 30  45 42  49 43 
59 (As at
Q3
(calendar
year))
60 (As at
Q3
(calendar
year)) 
CP_23 Number of new build
Council housing units reaching
completion (cumulative)
381 351  437 755  681 630  831 866 
CP_24 Number of empty homes
brought back into use (cumulative)* 603 500  724 600  1,058 600  1,181 600 
131

Page 132

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 6 of 7  
*CP_24 Number of empty properties brought back into use (cumulative) – An error was found in the 2019-2023 calculations for this PI.  This has been rectified as at
September 2023.  This has resulted in an increase in the number of empty properties recorded within this measure and a change in status for previous years to on
target (green).
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_25 Percentage of Council
dwellings that meet the Scottish
Housing Quality Standard (LGBF)
99.36% 99.4%  98.83% 99.5%  49.3% 99.5% 
Data
available
in May
2024
TBC 
CP_26 Tourism Visitor Numbers 1,599,40
0
1,534,96
8 315,620 1,534,96
8 858,300 1,534,96
8 
1,403,0
20
1,600,0
00 
CP_27 Street Cleanliness Index - 
Percentage Clean (LGBF) 94.6% 94%  91.34% 94%  86.7% 94%  84.6% 90% 
CP_28 Hectares of vacant &
derelict land in North Ayrshire 1,180 1,244  1,204 1,194  1,198 1,144  Data
pending 1,094 
CP_29 Overall carbon emissions
(tonnes)*** 37,508 39,320  22,846 35,127  21,791 21,247  20,896 21,000 
CP_30 Total installed capacity of
low carbon heat and electricity
generation across the Council's
estate
9,700 9,700  10,720 9,800  11,680 11,000  Data
pending 11,800 
CP_31 Percentage of total
household waste that is recycled
(calendar year as per SEPA)
(LGBF)
56.3% 59%  52.1% 52.1%  56.3% 53.1%  55.3% 56.9% 
132

Page 133

Appendix 2 - Council Plan Performance Indicators  Year End 2022-23 Page 7 of 7  
Priority - A Council for the Future 
Code & Short Name
2019/20 2020/21 2021/22 2022/23
Value Target Status Value Target Status Value Target Status Value Target Status
CP_32 Percentage of Customers
delighted with the overall Customer
Service
81% 77%  Surveys suspended due to COVID-19 and due to resume in 2023/24.
CP_33 % of Self Service Transactions 41.26% 40%  58% 45%  58.33% 50%  60.07% 50% 
CP_34 Employee Engagement Level -
Council Wide 70.67% 70%  No Survey Planned 
133

Page 134

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 1 of 6   
Appendix 3 - Council Plan Action Tracker 
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Aspiring Communities 
What we’
ll do to make active and strong
communities
CP_01 We will build stronger relationships between the council,
communities and partners.             
CP_02
We will co-produce a local charter with our communities
which sets out the things we jointly commit to do for each
other, to help each other create a better North Ayrshire.         
Complete 
CP_03
We will extend our participatory approach, offering
communities more opportunities to lead in local decision-
making.             
Complete 
CP_04 We will support communities to achieve what’s important to
them through strong local networks.             
What we’
ll do to
ensure our children
and young people    CP_05
We will expand our early learning and childcare provision to
make sure all eligible children are able to access 1140 hours of
free care each year.                
CP_06
We will support our children and young people to become
successful learners, confident individuals, effective
contributors and responsible citizens.                
134

Page 135

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 2 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP_07
We will offer opportunities to our young people and their
families to play a more active role in school life and encourage
more participation in learning opportunities.                
CP_08
We will work with all young people to build their resilience,
supporting their mental health and physical wellbeing.       
What we’
ll do to have an inclusive, growing
and enterprising local economy
CP_09
We will work with schools, colleges, universities, businesses
and partners to deliver education, skills and training, helping
people into work and sustaining employment.                
CP_10 We will make sure that everyone has the ability and
knowledge to participate in the digital world.                
CP_11 We will support our local businesses to become more
innovative and competitive.                
CP_12 We will promote fair employment practices.                
CP_13 We will develop and implement a Community Wealth Building
(CWB) strategy.                
What we’
ll do
to make sure
North Ayrshire    CP_14
We will continue our work with partners, including the
Scottish Government, to explore the feasibility of a Scottish
Basic Income Pilot.     
Complete
CP_15
We will let people decide how best to manage their own care
needs and support people to live in their own homes for as
long as possible.                
135

Page 136

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 3 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP_16 We will work with individuals and communities to support
positive lifestyle choices which improve health and wellbeing.                
What we will do
to ensure North
Ayrshire    CP_17 We will work with partners to support our vulnerable
residents and communities.                
CP_18 We will extend the ‘Housing First’ pilot to address
homelessness.                
Inspiring Place
What we’
ll do to make North Ayrshire well-connected with
effective infrastructure
CP_19
We will provide well-maintained, integrated travel and
transport networks, supporting alternative and sustainable
transport.                
CP_20
We will work with partners to make sure there is sustained
investment in our roads, ports and harbour infrastructure to
ensure that travel is resilient and reliable.             
Complete 
CP_21 We will work with partners to extend public wi-fi and improve
our digital connectivity.                 
CP_22
We will provide an appropriately sized, fit for purpose,
energy-efficient and digital- enabled property portfolio,
including our schools.                
CP_23
We will attract investment, through the Ayrshire Growth Deal
and other means, to support regeneration and job creation at
our key development sites of i3 Irvine, Hunterston, Lochshore,
Ardrossan Marine Quarter, and the Irvine Great Harbour.                
CP_24
We will support our communities to maximise the use of
community assets (such as schools) and encourage
Community Asset Transfers.             
Complete 
136

Page 137

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 4 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we’
ll do to provide our
residents with homes and houses that
meet their needs
CP_25
With our social landlord partners, we will build new, modern,
energy-efficient lifelong homes for life, tailored to the needs
of tenants.             
Complete 
CP_26 We will actively promote a mix of homes by facilitating private
housing development.                
CP_27
We will work with property owners and landlords to make
sure our private housing is suitable for the needs of our
residents.             
Complete 
CP_28 We will form a partnership with other Councils to introduce a
low-cost energy offer.    
Off
Programme
No longer being pursued following a decision by Nottingham City
Council to sell their not-for-profit energy company to British Gas
following significant financial losses.
What we’
ll do to make North Ayrshire a
vibrant, welcoming and attractive environment
CP_29 We will provide well-kept public places and town centres
which will benefit our residents, visitors and businesses.                
CP_30 We will, where possible, bring empty properties back into use.                
CP_31 We will work with communities to improve the quality of the
local environment through a participatory approach.              Complete 
CP_32 We will develop North Ayrshire as a coastal and island
destination, attracting tourism investment and visitors.                
137

Page 138

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 5 of 6   
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End 
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
What we'll do to make sure we all live in a
sustainable environment
CP_33 We will support a circular economy by re-using, recycling and
generating energy from the waste we manage.            Complete 
CP_34 We will develop additional low carbon renewable energy
schemes and networks.                
CP_35
We will protect our communities by delivering the Local Flood
Risk Management Plan, the Shoreline Management Plan and
the Millport and Upper Garnock Valley Flood Protection
Schemes.                
A Council for the Future
An accessible Council that puts
residents and communities at
the heart of what we do CP_36
We will work with communities and key stakeholders to
radically review what we do and how we do it, to deliver cost
effective services.                
CP_37 We will provide joined up services across the Council and with
partner agencies and communities.                
CP_38 We will use technology to improve access to and delivery of
our services.                
138

Page 139

Appendix 3 - Council Plan Actions  Year End 2022-23 Page 6 of 6
*2021 status based on information available rather than specific sub-actions.
**Council Plan Delivery Plan was in development during Q1. 2019-20 2020-21* 2021-22 2022-23 2023-24
Priority
Outcome
Ref # Existing Overall Action Q1 Q2 Q3 Q4 Year End
Estimate Q1** Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
A powerful and
respected voice
CP_39 We will make our case nationally, regionally and locally levels
to secure investment to support delivery of our priorities. Complete
An efficient Council that
maximises resources and
provides value for money
CP_40 We will review what we do and how we do it to ensure we
deliver the best possible services.
This action was removed as approved by Cabinet in August 2021 as
it duplicates CP_36 and CP_37.
A valued workforce
that delivers high
quality services
CP_41 We will empower and invest in our workforce to develop new
and innovative ways of working.
139

Page 140

North Ayrshire Council
Annual Performance Report 2022-23
Appendix 4
140

Page 141

Welcome to our Annual Performance Report 2022-23
This report provides an at a glance summary of how we’ve supported
our residents of North Ayrshire over the past year. You can find full
details in our magazine style Council Plan Progress Reports published
on our website (https://www.north-ayrshire.gov.uk/performance).
In June 2023, our new Council Plan 2023-28 was approved by
Council.  As a result, this Annual Performance Report is the final
annual report relating to our 2019-24 plan and our vision remains to
achieve a North Ayrshire that is fair for all.
We are proud to serve our people of North Ayrshire and would like
to say thank you to everyone who has supported the delivery of our
services including our communities, Third Sector, public and private
partnerships and of course our employees. 
Councillor Marie Burns
Leader of the Council
Craig Hatton
Chief Executive
141

Page 142

About Us 
Elected Members 
• 12 Scottish National Party (SNP) 
• 10 Scottish Conservative and Unionist 
• 6 Scottish Labour Party
• 3 Labour and Co-Operative Party
• 2 Independent 
Employees 
• 6,249.29 Full Time Equivalent employees
• 72% Female 
• 28% Male 
Key Facts
• 134,220
• Life Expectancy:
o Female:  79.7 years
o Male:  74.4 years
• 19,669 children and young people attend our
schools and early years centres (including
partner early years centres)
• 22.7% of children are looked after by our
Council (14% at Scotland level) 
• 29% of children in North Ayrshire live in
poverty (after housing costs)
• 28% of households are in fuel poverty
• 71.2% of residents are in employment
• 40.9% of our residents live in the most
deprived Scottish Index of Multiple
Deprivation areas
Key assets include: 
• 42 Local Authority Early Years Provisions
• 14 Partner Early Years Provisions
• 48 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School 
• 1 Through School (Early Learning Centre,
Primary & Secondary School combined) 
• 13,135 Council Homes
• 1,044km carriageway 
• 1,020km footpaths
• 23,735 streetlights
• 16 beaches (including 3 Sites of Special
Scientific Interest (SSSI))
• 275 Hectares of woodland
• 11,680kW Total installed capacity of low
carbon heat and electricity generation across
our Council’s estate 
142

Page 143

Financial Overview 
Scottish
Government
General Grant,
£290.711, 71%
Scottish
Government
Specific Grant,
£20.742, 5%
Non Domestic
Rates, £37.497,
9%
Council Tax,
£61.989, 15%
Funding (£000's)
Chief
Executive's,
£26.378 , 6%
Communities &
Education,
£170.353 , 42%
Place, £55.157 ,
13%
Health and
Social Care
Partnership,
£120.549 , 29%
Other Corporate
Items, £10.837 ,
3%
Financing Costs,
£27.665 , 7%
Allocation (£000's)
143

Page 144

Our Council Plan
Our Council Plan is our commitment to our communities.  It underpins everything we do for our
people in North Ayrshire.
The Council Plan 2019-24 has three priorities: ‘Aspiring Communities’, ‘Inspiring Place’ and ‘A Council
for the Future’.  
Aspiring Communities
• Our Child Poverty and Cost of Living Board was established in June 2022, with a £1.4m Early
Intervention Fund allocated to the Board in March 2023.
• We held five mini public enquiries which have informed our Child Poverty Action Plan and
Council Plan.
• Our Energy Smart Scheme was allocated £1.726m in our 2022/23 budget, with an additional
£450,000 approved in August.
• 18,962 National Entitlement Cards and Young Scot NECs have been used to date – the third
highest in Scotland.
• 128 community groups were successful in their participatory budgeting bids. Each group will
receive a share of £109,777.
• To strengthen the Community Hub model, 14 sites across North Ayrshire now have Fairer Food
community larders embedded within community facilities.
• Our first Annual Promise Conference welcomed 130 people.
• 170 people attended our Reducing the Cost of the School Day conference.
• 100 stakeholders from across Scotland attended our first Community Wealth Building
conference.
• During 2022/23, the Fair Work Ayrshire Team engaged with 236 businesses.
• 3,642 inclusive Active School sessions were delivered to 5,976 of our young people.
• Cabinet approved the allocated of £2.154m of Scottish Government Covid Recovery Fund for a
range of support to low-income households.
• A £434million Capital Investment Programme has been approved by Cabinet.
• Work on the £48million flood protection scheme for Millport has begun.
Inspiring Place
• The formal opening of our £4.2million Lochshore Hub took place in September 2022, attracting
approximately 1,000 attendees with a free family fun day.
• We held our first ever Making Waves Festival in Irvine on 23rd and 24th of July.
• We have awarded the tender to deliver two Council-owned solar farms.  The £12.8million
project will see the former landfill sites at Nethermains in Kilwinning, and Shewalton in Irvine
transformed into two solar farms.
• We have established a Community Renewable Energy Generation Funding Scheme.  The
scheme empowers communities to undertake renewable energy initiatives.
• The first year of advertising on roundabouts across North Ayrshire has been positive.  Of the 24
roundabouts locations initially granted planning consent, 23 locations were sold within one
week of release.
144

Page 145

• Secured partnership of National Manufacturing Institute Scotland and University of
Strathclyde as having a presence as lead operator of a national innovation centre for
manufacturing.
• Developed academic partnerships with University of Stirling to support our blue economy
ambitions through the International Marine Science Centre project and Hunterston.
• Our Council Strategic Housing Investment Plan (SHIP) 2023-2028 has been finalised which
supports the Scottish Government’s Affordable Housing Supply Programme (AHSP). A total of
831 new Council units have been completed since our development programme commenced.
• Renovation works to improve and restore the 144-year-old Millport Town Hall building have
begun.
A Council for the Future
• We successfully delivered the Local Government Elections on Thursday 5 May 2022 with a
turnout of 44%
• 1,400 people completed the 2023/24 Budget and Council Plan Engagement Survey, in addition
to 37 community representatives across six locality events.
• Our procurement process has been revised to ensure more local businesses are able to quote
for lower value goods and services through the Quick Quote process.
• We have received Recruit with Conviction Ambassador status.
• We jointly held the first ever Hate Crime Conference in Ayrshire, which was delivered by the
Ayrshire Equality Partnership (AEP)
• We achieved the Disability Confident: Level Three Leader Award.
• We committed to the Miscarriage Association’s Pregnancy Loss Pledge.
• We have signed up to the Gambling Charter so that we can best support and help our workforce
to manage issues caused by gambling.
How do we compare?
You can see how our performance compares to other Scottish local
authorities through the national Local Government Benchmarking
Framework online tool.   
The Corporate Policy, Performance and Elections Team welcome any feedback you may have.  We strive to make
our Council and reports as accessible as possible and appreciate opportunities to discuss how this can be achieved. 
For further information please contact: 
The Corporate Policy, Performance and Elections Team
Tel: 01294 310000
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
145

Page 146

Local Government Benchmarking Framework
Analysis of 2023 Data Release
(Includes 2021-22 and specific data for 2022-23)
September 2023
Appendix 5
146

Page 147

Local Government Benchmarking Framework – September 2023 Analysis Page 1 of 24
Contents
Introduc�on ............................................................................................................................................ 2
Our Approach .......................................................................................................................................... 3
Analysis ................................................................................................................................................... 5
People Services ................................................................................................................................... 5
Propor�on of children living in poverty (a�er housing costs) ........................................................ 6
Gross rent arrears (all tenants) as a percentage of rent due for the year ...................................... 7
Propor�on of children mee�ng developmental milestones ........................................................... 7
Propor�on of pupils entering posi�ve des�na�ons........................................................................ 8
Propor�on of council dwellings mee�ng the Sco�sh Housing Quality Standards ......................... 8
Propor�on of council dwellings that are energy efficient ............................................................... 9
Percentage of people aged 65 years and over with long-term health needs who are receiving
personal care at home .................................................................................................................. 10
Other Services ................................................................................................................................... 10
CO2 emissions area wide per capita (tonnes) ............................................................................... 11
CO2 emissions area wide: emissions within scope of local authority per capita (tonnes) ........... 11
Claimant count as a percentage of working age popula�on ........................................................ 12
Claimant count as a percentage of popula�on aged 16 to 24 years ............................................. 12
Propor�on of people earning less than the living wage ............................................................... 13
Percentage of unemployed people assisted into work from Council programmes ...................... 13
Gross Value Added (GVA) per capita ............................................................................................. 14
Immediately available employment land as a percentage of total land allocated for employment
purposes ........................................................................................................................................ 15
Propor�on of procurement spent on local enterprises ................................................................ 16
Number of business gateway start-ups per 10,000 popula�on .................................................... 17
Town Vacancy Rates ...................................................................................................................... 18
Propor�on of proper�es receiving Superfast Broadband ............................................................. 18
Street Cleanliness Score ................................................................................................................ 19
Propor�on of total household waste arising that is recycled ....................................................... 19
Propor�on of the highest paid 5% of employees who are women .............................................. 21
Gender pay gap ............................................................................................................................. 21
Percentage of income due from Council Tax recevied by the end of the year ............................. 22
Percentage of invoices sampled that were paid within 30 days ................................................... 22
Percentage of Sco�sh Welfare Fund Crisis Grant decisions made within one day ...................... 23
Percentage of Sco�sh Welfare Fund Community Care Grant decisions made within 15 days .... 24
Percentage of opera�onal buildings suitable for their current use .............................................. 24
147

Page 148

Local Government Benchmarking Framework – September 2023 Analysis Page 2 of 24
Introduc�on
The Local Government Benchmarking Framework (LGBF) provides an opportunity to benchmark our
performance with other local authori�es in Scotland.  It is administered by the Improvement Service
in partnership with the Society of Local Authority Chief Execu�ves (SOLACE) and highlighted within
the Accounts Commission’s Statutory Performance Informa�on Direc�on 2021 which defines how
local authori�es should demonstrate they are achieving Best Value for the people they serve.  As a
result, many of the indicators are used within both our previous 2019-24 and current 2023-28
Council Plans. 
The 2021-22 data is s�ll caveated due to the impact of the pandemic.  The Improvement Service
states: “This dataset covers the 2nd year of the Covid pandemic. The Impact of Covid has altered the
core opera�ng and delivery landscapes for local authori�es, and the performance and expenditure
data within the LGBF will need to be interpreted against this context. This will be important to
consider both for comparison with previous years, and also comparison across councils.” 
The impact of the pandemic can certainly be seen in the trend charts contained in this report.  As a
result, though this report details our performance as at 2021-22 compared with similar local
authori�es, it is s�ll rela�vely light touch with improvements planned for future repor�ng.
The LGBF brings together a range of 105 performance indicators covering nine key themes:
• Adult Social Care
• Children’s Services
• Corporate Services
• Culture and Leisure
• Economic Development
• Environmental Services
• Financial Sustainability
• Housing
• Tackling Climate Change
These can be explored in full using the LGBF Dashboard.
148

Page 149

Local Government Benchmarking Framework – September 2023 Analysis Page 3 of 24
Our Approach
The Direc�on 2021 Statutory Performance Indicator 1 includes a requirement for our Council to
report informa�on that demonstrates how we are improving local services and local outcomes.  This
par�cularly relates to using the LGBF to enable comparison with similar bodies and over �me, linked
to the desired outcomes agreed with our partners and communi�es.  As such, the Direc�on 2021
gives scope to iden�fy the key LGBF measures that relate directly to our Council Plan priori�es to
help inform decision making.  South Lanarkshire Council took this approach and was highlighted by
the Accounts Commission in the Local Government in Scotland Overview 2023.  
The following PIs have been iden�fied by the Corporate Policy, Performance and Elec�ons Team as
rela�ng directly to our current Council Plan 2023-28 priori�es.  These are listed in addi�on to those
directly included our Council Plan Performance Management Framework and our Council Plan 2019-
24, which was ac�ve during this 2021-22 repor�ng period.  
LGBF
Indicator
Group
PI Code Description
Council
Plan 
2019-23
Framework
Council
Plan 
2023-28
Framework
Children’s
Services CHN11 Percentage of pupils entering positive destinations Yes Yes
Children’s
Services CHN17 Percentage of children meeting developmental
milestones  Yes
Children’s
Services CHN24 Percentage of children living in poverty (after
housing costs)  Yes
Adult Social
Care* SW3a
Percentage of people aged 65 years or over with
long-term care needs receiving personal care at
home
Yes 
Tackling
Climate
Change
CLIM1 CO2 emissions area wide per capita  Yes
Tackling
Climate
Change
CLIM2 CO2 emissions area wide: emissions within scope of
LA per capita  
Economic
Development ECON1
Percentage of unemployed people assisted into
work from council operated / funded employability
programmes  
Economic
Development ECON10
Immediately available employment land as a
percentage of total land allocated for employment
purposes in the local development plan  
Economic
Development ECON11 Gross Value Added (GVA) per capita  
Economic
Development ECON12a Claimant Count as a percentage of Working Age
Population  
Economic
Development ECON12b Claimant Count as a percentage of population aged
between 16 and 24 years  
Economic
Development ECON4 Percentage of procurement spend spent on local
enterprises  
Economic
Development ECON5 Number of business gateway start-ups per 10,000
population  
149

Page 150

Local Government Benchmarking Framework – September 2023 Analysis Page 4 of 24
LGBF
Indicator
Group
PI Code Description
Council
Plan 
2019-23
Framework
Council
Plan 
2023-28
Framework
Economic
Development ECON7 Proportion of people earning less than the real
living wage Yes Yes
Economic
Development ECON9 Town Vacancy Rates  
Environmental
Services ENV3c Street Cleanliness Score Yes Yes
Environmental
Services ENV4b Percentage of A class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4c Percentage of B class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4d Percentage of C class roads that should be
considered for maintenance treatment  
Environmental
Services ENV4e Percentage of unclassified roads that should be
considered for maintenance treatment  
Environmental
Services ENV6 Percentage of total household waste arising that is
recycled Yes Yes
Housing
Services HSN1b
Gross rent arrears (all tenants) as at 31 March each
year as a percentage of rent due for the reporting
year 
Yes
Housing
Services HSN3 Percentage of council dwellings meeting Scottish
Housing Standards Yes Yes
Housing
Services HSN5a Percentage of council dwellings that are energy
efficient  Yes
Economic
Development* ECON8 Proportion of properties receiving superfast
broadband Yes 
Corporate
Services CORP 3b Percentage of the highest paid 5% of employees
who are women  
Corporate
Services CORP 3c The gender pay gap (%)  
Corporate
Services CORP 7 Percentage of income due from council tax received
by the end of the year  Yes
Corporate
Services CORP 8 Percentage of invoices sampled that were paid
within 30 days  
Corporate
Services CORP 9 Percentage of Scottish Welfare Fund Crisis Grant
decisions within one day  
Corporate
Services CORP 10 Percentage of Scottish Welfare Fund Community
Care Grant decisions in 15 days  
Corporate
Asset
CORP-
ASSET1
Percentage of operational buildings that are
suitable for their current use Yes Yes 
*Please note, the list above includes two LGBF PIs that were included in the Council Plan 2019-24
Performance Management Framework for completeness.   Adult Social Care is reported through the
Health and Social Care Partnership.  Superfast Broadband is part of the na�onal R100 programme
and we cannot directly impact on progress.   These two indicators will not be included in future
repor�ng.
150

Page 151

Local Government Benchmarking Framework – September 2023 Analysis Page 5 of 24 
Analysis
Family groups enable local authori�es to make as close to a like for like comparison as possible with
other councils by grouping those with similar traits depending on the type of indicator.  Grouping is
based on levels of depriva�on (people services) or rurality (other services).  Following a review of
previous repor�ng, a more visual chart-based approach and analysis focussing on family groups is
taken for this report.  This more in-depth considera�on of each indicator is made possible by
focussing on the indicators directly linking to our priori�es, in line with the Direc�on 2021.
On the following charts, North Ayrshire Council’s performance is indicated by a thick dark blue line. 
For ease of viewing, only the data labels rela�ng to North Ayrshire Council are included in the
graphs.  Full details, including the meta data behind each measure which explains how it is captured,
is available through the LGBF Dashboard.
The Improvement Service is currently exploring how to publish data more �meously, therefore
though this report intends to cover 2021-22 data as released during 2023, some informa�on may
relate to more recent periods.  Data is as downloaded in September 2023 unless otherwise stated. 
People Services
This sec�on provides an overview of North Ayrshire’s performance within our ‘People Services’
Family Group.  This includes our priority indicators rela�ng to Children, Social Work and Housing. 
Local authori�es included in this comparison are:
• North Ayrshire Council
• Comhairle nan Eilean Siar 
• Dundee City Council 
• East Ayrshire Council 
• North Lanarkshire Council 
• Inverclyde Council 
• West Dunbartonshire Council 
• Glasgow City Council 
151

Page 152

Local Government Benchmarking Framework – September 2023 Analysis Page 6 of 24
Propor�on of children living in poverty (a�er housing costs)
(Please note, the axis of this chart is 15- 35% for clarity.)
Despite 2020-21 figures appearing to show a decrease in child poverty, unfortunately this due to a
change in methodology during the lockdown periods as detailed in our Council Plan Mid-Year 2022-
23 report “These figures are sourced from Loughborough University and are based on the
Department for Work and Pensions (DWP) figures which come with a caveat that they are impacted
by Covid-19 (whereas 2019-20 figures were unaffected). Due to the pandemic, the method for
gathering this information changed from focus groups to telephone calls (meaning it wasn’t possible
to verify if actual documents such as payslips etc. were referred to during discussions) and the sample
size was also affected. As a result, the UK Government states “We recommend that all users consider
using the caveat: ‘Data collection for FYE 2021 was affected by the coronavirus (Covid-19) pandemic.
Figures for FYE 2021 are subject to additional uncertainty and may not be strictly comparable with
previous years.’””
Data released in 2023, rela�ng to 2021-22, shows an increase from 24.7% to 29% of children living in
poverty (though the figures are not directly comparable due to methodology).  North Ayrshire
Council established our Child Poverty and Cost of Living Board in June 2022 and published our North
Ayrshire Child Poverty Ac�on Plan 2023-26 in June 2023.  In addi�on, Wellbeing is at the heart of our
new Council Plan 2023-28.
We are working closely with our communi�es and partners to address the drivers of poverty and
help find a sustainable route out of poverty for our most vulnerable families.  This will be reported in
our six-monthly Council Plan Progress Reports and annual Child Poverty Plan Reports. 
152

Page 153

Local Government Benchmarking Framework – September 2023 Analysis Page 7 of 24
Gross rent arrears (all tenants) as a percentage of rent due for the year 
(Please note the axis for this chart is 0-10% for clarity.)  There has been an increase in the percentage
of rent due.  There was a slight increase prior to the ini�al lockdown period of March 2020, but has
increased by three percentage points over two years to 6.63%.  This is lower than other family group
members (where informa�on is available) and in line with the trend for East Ayrshire and Dundee
City Councils.
Propor�on of children mee�ng developmental milestones 
This indicator relates to the propor�on of children mee�ng developmental milestones as reported by
our Health and Social Care Partnership.  The chart axis shows 70-90% for clarity.  Overall
153

Page 154

Local Government Benchmarking Framework – September 2023 Analysis Page 8 of 24
performance appears to be in line with the majority of our family group, with only East Ayrshire and
Dundee City Councils maintaining performance into 2021-22, rather than declining.
Propor�on of pupils entering posi�ve des�na�ons
Though performance has varied over the past decade, the overall trend is posi�ve.  Though 2019-20
may appear to predate the pandemic, this �me period relates to academic years.  As such, it would
have been deeply affected by the lockdown periods.
Data is sourced from Sco�sh Government School Leaver Atainment and Ini�al Des�na�ons
informa�on.  Though data is included for 11 years, the source data notes state due to changes in the
curriculum over the past five years, trends over �me may not be comparable.
Propor�on of council dwellings mee�ng the Sco�sh Housing Quality Standards
154

Page 155

Local Government Benchmarking Framework – September 2023 Analysis Page 9 of 24
The energy efficient elements of the Sco�sh Housing Quality Standards were replaced by the Energy
Efficiency Standard for Social Housing (EESSH) that had to be met by landlords by 2020.  The sudden
drop in performance can be seen na�onally with a sharp decline in the Sco�sh average from 90.3%
in 2020-21 to 68.5% in 2021-22.  
The Improvement Service states:
“The covid pandemic has had a significant impact on councils’ ability to deliver housing services as
normal.  The pandemic affected landlords’ ability to deliver core services such as repairing homes,
letting empty homes, assisting people experiencing homelessness and a range of other services. 
Landlords have had to curtail their planned investment programmes, including those to build new
homes and to achieve the Scottish Housing Quality Standard and the Energy Efficiency Standard in
Social Housing.”
Propor�on of council dwellings that are energy efficient 
North Ayrshire Council is performing well compared to other local authori�es in our family group. 
East Ayrshire has slightly beter performance at 99.53%.  We are significantly higher than the Sco�sh
average of 87.6% and are currently ranked 4th in Scotland for 2021-22.  Though this represents a
slight decrease in ranking as we have been ranked 1st or 2nd since 2016-17, our performance is
consistent.  
155

Page 156

Local Government Benchmarking Framework – September 2023 Analysis Page 10 of 24
Percentage of people aged 65 years and over with long-term health needs who are receiving
personal care at home 
This measure was included in our previous Council Plan 2019-23.  North Ayrshire Council is
con�nuing to improve performance in this area, providing the third best performance in our family
group a�er West Dunbartonshire and East Ayrshire Councils (72.9% and 71.13% respec�vely).  It
should be noted, that due to data completeness issues, some data for this indicator has been
modelled by the Improvement Service. 
Other Services
This sec�on provides an overview of North Ayrshire’s performance within our ‘Other Services’ Family
Group.  This includes indicators rela�ng to Corporate Services, Culture & Leisure, Economic
Development, Environmental Services, Financial Sustainability and Tackling Climate Change.  Local
authori�es included in this comparison are: 
• North Ayrshire Council
• Perth and Kinross Council 
• S�rling Council 
• Moray Council 
• South Ayrshire Council 
• East Ayrshire Council 
• East Lothian Council 
• Fife Council 
156

Page 157

Local Government Benchmarking Framework – September 2023 Analysis Page 11 of 24
CO2 emissions area wide per capita (tonnes)
This measure looks at the CO2 emissions that are area-wide, not only in the scope of North Ayrshire
Council.  It is useful for context.  Lockdown periods did impact emissions in areas such as transport
during 2020-21.
CO2 emissions area wide: emissions within scope of local authority per capita (tonnes)
This measure shows the emissions within the control of North Ayrshire Council.  There has been a
strong decrease in emissions over the past 11 years na�onally across all 32 local authori�es.  North
Ayrshire Council has a commitment to be Net Zero by 2030, this has recently been reiterated within
our new Council Plan 2023-28, with Climate Change being one of our four priori�es for the next five
years.
157

Page 158

Local Government Benchmarking Framework – September 2023 Analysis Page 12 of 24
Claimant count as a percentage of working age popula�on 
This data is based on informa�on available as at July 2023.  North Ayrshire had the highest claimant
count rates as a percentage of working age popula�on within our family group 2021-22.  A rise due
to the pandemic is clearly visible in 2020-21.  2021-22 levels are also higher than the Sco�sh
Average (4.5%).  During the first months of 2023-24, North Ayrshire’s claimant count was 4.6%,
compared to an average of 4% for our family group and 3.2% at Scotland level.  This is related to a
decrease in the number of claimants (a reduc�on of around 3,100 claimants between 2020-21 and
2022-23), rather than an increase in the working age popula�on.
Claimant count as a percentage of popula�on aged 16 to 24 years 
The claimant count for our young people aged 16 to 24 years is slightly higher at 2021-22 than for
the overall claimant count.  Most recent figures available show an improvement to 5.5%, though
158

Page 159

Local Government Benchmarking Framework – September 2023 Analysis Page 13 of 24
higher than the family group average of 4.6% and Sco�sh average of 3.6%.  Again, this is related to a
reduc�on in the number of claimants rather than an increase in popula�on (approximately 1,400
claimants in 2020-21, reducing to approximately 700 in 2023-24).
Propor�on of people earning less than the living wage 
The propor�on of people earning less than the living wage is con�nuing to decrease in North
Ayrshire.  Currently only East Ayrshire Council is performing beter within our family group (9.20%). 
At 11.7% for 2021-22, we are performing beter than the Sco�sh average of 14.4%.  We are currently
ranked 5th across all Sco�sh local authori�es in this area, an improvement from 12th in 2020-21, 9th
in 2019-20 and 19th in 2018-19 which appears to show real progress in this area.
Percentage of unemployed people assisted into work from Council programmes 
159

Page 160

Local Government Benchmarking Framework – September 2023 Analysis Page 14 of 24
The percentage of unemployed people assisted into work from our employability programmes has an
overall posi�ve long-term trend.  This measure can be impacted by how far an individual is from
gaining the skills required to obtain employment, as well as the current unemployment rate.  2020-
21 performance was impacted by a slight increase in the employment rate and a decrease in the
ability to help residents into work due to the pandemic.  During 2021-22, the number of unemployed
people reduced from 3,400 to 2,300 and the performance of our Employability and Skills Team
recovered following the pandemic, with 555 people helped into employment.  This combina�on is
shown as a spike in the chart above.
Gross Value Added (GVA) per capita 
Gross Value Added (GVA) is something we can help influence as a local authority, however it relies on
all industry within North Ayrshire and is monitored for context.  Currently North Ayrshire has a GVA
of £17,553, below the Sco�sh average of £25,758 however, it shows a slight long term posi�ve
trend.  Significant work is ongoing around our Ayrshire Growth Deal and Community Wealth Building
Strategy which should con�nue to influence this.
160

Page 161

Local Government Benchmarking Framework – September 2023 Analysis Page 15 of 24
Immediately available employment land as a percentage of total land allocated for
employment purposes 
As well as ensuring our residents have the skills for good quality jobs available in North Ayrshire, we
also work to ensure there is suitable employment land for businesses wishing to grow or invest in our
area.  We have a greater amount of currently available employment land as a percentage of total
allocated employment than other local authori�es in our family group and the Sco�sh average
(27.2%).  We need to maintain a balance between having enough good quality employment space
available for demand, without crea�ng an excess.  
It is difficult from this data alone to determine whether performance is currently posi�ve.  In
addi�on, it should be noted, that due to data availability issues, some data for this indicator has been
modelled by the Improvement Service. 
161

Page 162

Local Government Benchmarking Framework – September 2023 Analysis Page 16 of 24
Propor�on of procurement spent on local enterprises
This indicator is a useful comparison for benchmarking purposes, however it does not capture all
spend as detailed in our 2020-21 Mid-Year Council Plan Progress Report.  “The LGBF calcula�on
excludes certain spend, most notably it excludes all supplier spend below £1,000 and excludes all
suppliers not categorised as core trade organisa�ons. This is therefore not an accurate reflec�on of
the economic ac�vity within North Ayrshire. As we have access to the source data used by the LGBF
we are able to capture all spend data and refine the calcula�on at a local level to beter capture our
spend with local enterprises and shorten the �me delay in repor�ng.” 
Our in-house local procurement spend measure (CP_10a) shows an increase from 22.93% at 2021-22
to 26.04% at 2022-23.  Embracing Community Wealth Building through providing addi�onal support
for local suppliers including a revised Quick Quote process for lower value procurement is suppor�ng
this area.
162

Page 163

Local Government Benchmarking Framework – September 2023 Analysis Page 17 of 24
Number of business gateway start-ups per 10,000 popula�on 
The number of business gateway start-ups per 10,000 popula�on has decreased during the
pandemic and had not recovered as at 2021-22.  2022-23 figures (not included above) show 11 start-
ups per 10,000 popula�on for North Ayrshire, compared to a family group average of 16.2 and
Sco�sh average of 14.3.  Popula�on can affect this indicator but has remained constant during the
past two years.  The increase in 2022-23 is due to an increase in the number of start-ups from 114 in
2020-21 to 148 in 2022-23.  There is s�ll some work required to return to pre-pandemic levels of 293
start-ups in 2019-20, however the current cost of living crisis is having a detrimental impact on
businesses across the UK.
163

Page 164

Local Government Benchmarking Framework – September 2023 Analysis Page 18 of 24
Town Vacancy Rates 
Town vacancy rates have remained rela�vely consistent.  It has been higher than the Sco�sh average
since 2019-20, though only slightly so in 2021-22 (North Ayrshire vacancy rate is 12.2% compared to
11.4% at Scotland level).  It should be noted, that due to data completeness issues, some data for
this indicator has been modelled by the Improvement Service.
Propor�on of proper�es receiving Superfast Broadband 
This measure is directly linked to the na�onal R100 programme.  It was included in our Council Plan
2019-24 for context but is not directly influenced by North Ayrshire Council.
164

Page 165

Local Government Benchmarking Framework – September 2023 Analysis Page 19 of 24
Street Cleanliness Score 
Street cleanliness was impacted by the pandemic as resources were diverted to other services such
as waste collec�on.  Work is ongoing to recover performance and had reached 86.3% as at
September 2022.  To help address performance, larger capacity street bins and an evalua�on of our
exis�ng street cleaning schedule has been completed, as detailed in our 2022-23 Mid-Year Progress
Report.  A pilot is underway to target poorer performing streets with an increase in the frequency of
cleaning supported by liter educa�onal campaigns in these areas.
Propor�on of total household waste arising that is recycled 
North Ayrshire Council con�nues to perform well in this area, most recent local data shows
performance at 55.3% for 2022-23.  We were one of the few local authori�es to maintain collec�ons
throughout the pandemic. 
165

Page 166

Local Government Benchmarking Framework – September 2023 Analysis Page 20 of 24
Percentage of roads considered for maintenance treatment
166

Page 167

Local Government Benchmarking Framework – September 2023 Analysis Page 21 of 24
The percentage of roads to be considered for maintenance treatment is shown in the four charts on
the previous page and reflects the mixture of rural and urban areas in North Ayrshire.  Most recent
informa�on, from 2022-23 and used as a baseline within our new Council Plan 2023-28, shows 34.8%
of our road network overall should be considered for maintenance treatment.
Propor�on of the highest paid 5% of employees who are women
There is overall a long-term posi�ve trend in this area, increasing from 46.4% in 2010-11 to 61.17% in
2021-22.  
Gender pay gap
167

Page 168

Local Government Benchmarking Framework – September 2023 Analysis Page 22 of 24
Our Equality Mainstreaming report 2020-22 detailed how we are working to reduce horizontal and
ver�cal segrega�on in our workplace.  This also showed a reduc�on in our gender pay gap to 0.22%
in December 2022.
Percentage of income due from Council Tax received by the end of the year 
(Please note:  For clarity the chart axis range is 95% - 100%.)  North Ayrshire Council is performing
least well within our family group.  Perth and Kinross Council has the strongest performance with
97.7% of income due from Council Tax received by the end of the year compared to 93.34% for North
Ayrshire.  This represents £58.5million out of £62.7million (excluding relief and rebates) of Council
Tax owed in 2021-22.  We are currently ranked 31st out of the 32 local authori�es.
Percentage of invoices sampled that were paid within 30 days 
168

Page 169

Local Government Benchmarking Framework – September 2023 Analysis Page 23 of 24
(Please note:  For clarity the chart axis range is 75% to 100%.)  North Ayrshire Council has the
strongest performance within our family group.  This is also higher than the Sco�sh average of
92.2% for Scotland compared to 95.77% for North Ayrshire Council.  We are currently ranked 4th in
Scotland for the speed of our payments.
Percentage of Sco�sh Welfare Fund Crisis Grant decisions made within one day 
The Improvement Service is developing the LGBF to ensure more �meous data is available.  Most
recent data relates to the end of March 2023, when 99.5% of Sco�sh Welfare Fund Crisis Grant
decisions were made within one day, only behind East Ayrshire Council with 99.5% in our family
group.  This is above the Sco�sh average of 91.8%.  This shows strong performance and our
commitment to helping our most vulnerable residents in North Ayrshire.   
169

Page 170

Local Government Benchmarking Framework – September 2023 Analysis Page 24 of 24
Percentage of Sco�sh Welfare Fund Community Care Grant decisions made within 15 days 
As at the end of March 2023, 99.49% of Sco�sh Welfare Fund Community Care Grant decisions were
made within 15 days, second in our family group behind East Ayrshire with 100%.  This performance
has been consistent since 2018-19 and is above the Sco�sh average of 87.3%.  We are currently
ranked joint 4th with Inverclyde Council.
Percentage of opera�onal buildings suitable for their current use 
In North Ayrshire Council, 91.09% of our opera�onal buildings are suitable for their current use.  This
is higher than the family group average of 90.1% and the Sco�sh average of 85.3%.  The number of
opera�onal buildings within North Ayrshire Council has decreased from 334 in 2010-11, to 258 in
2021-22.  Moray Council, who are performing strongest in this area, have considerably fewer
opera�onal buildings, 165 as at 2021-22.
170

Page 171

NORTH AYRSHIRE COUNCIL 
25th January 2024   
Audit and Scrutiny Committee 
Title:    North Ayrshire Council Plan 2023-28:  
Performance Management Framework 
Purpose:  To consider the Council Plan 2023 – 2028 Performance
Management Framework. 
Recommendation:  The Audit and Scrutiny Committee notes the Council Plan
2023-28 Performance Management Framework attached at
Appendix 1. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our Council and details
our Council’s strategic priorities.  We have a statutory duty to publish information
that enables effective scrutiny of our performance.
1.2 This report asks the Audit and Scrutiny Committee to consider the Council Plan
2023-28 Performance Management Framework (PMF) (Appendix 1).  This will
be used alongside updates on actions (listed in our Council Plan), case studies,
contextual information and priority Local Government Benchmarking Framework
(LGBF) indicators to demonstrate progress against our Council Plan priorities in
our six monthly Progress Reports.
2 Background 
2.1 Our Council Plan is our Council’s most important strategic document setting out
our vision of ‘a North Ayrshire that is fair for all’ and key priorities.  Our new
Council Plan 2023-28 was approved by Council on 21st June 2023.  It was agreed
that the supporting framework would be developed and presented to Cabinet for
approval following the summer recess. 
2.2 Many of the challenges North Ayrshire experiences are complex and longer-term
solutions are required to address them sustainably.  As a result, each Council
Plan is designed to build on the progress of the previous plan and a degree of
continuity can be identified in each.  In consideration of this, 13 indicators remain
relevant and continue from the previous Council Plan.  
Agenda Item 8
171

Page 172

3 Our Performance Management Framework
3.1 Actively managing performance through the collection of accurate and relevant
information and setting informed targets is crucial to the successful delivery of
our Council Plan and demonstrating Best Value.  The Statutory Performance
Information Direction 2021 states local authorities must publish information that
compares with previous years as well as with other local authorities in order to
demonstrate Best Value.  Information must be presented in an accessible style
for all of our citizens and communities.  
3.2 As agreed at Council, performance will be measured through regular reporting
to Cabinet and the Audit and Scrutiny Committee.  
3.3 The framework measures are included at Appendix 1 alongside current
baselines and targets.  It contains a range of 26 performance indicators directly
linked to our priorities and our Council’s performance.  However, our Council
does not operate in isolation, and impact cannot be shown through numerical
measures alone.  Therefore the framework is part of a suite of information
provided through our Council Plan reporting to allow effective scrutiny of our
delivery.  This includes:
• The Inclusive Growth Dashboard Summary – A locally developed tool that
provides contextual data on trends within North Ayrshire and is independent of
the Council Plan PMF.  This includes indicators such as child poverty rates,
employability and area-wide climate measures.  A summary will be provided in
reporting to provide context to our performance.
• LGBF Priority Indicators – LGBF measures that directly link to our priorities. 
Ten are included directly in the PMF and a benchmarking report is provided on
all priority LGBF indicators annually.
• Action Updates – Published within our Council Plan and linked directly to the
delivery of our strategies throughout our Council, these provide qualitative
updates on progress and impact on our residents.
• Case Studies – Capturing real lived experience to help show the impact of our
Council, including through partnership working.
3.4 We will review our Performance Framework regularly to ensure the information
continues to be relevant and takes account of any external changes or
opportunities.  
3.5 In summary, the aim has been to produce a Council Plan Performance
Management Framework which is strategic, transparent and has the potential to
evolve over the lifetime of the Council Plan.  Most importantly it will help
demonstrate how we are working together to improve the lives of our people in
North Ayrshire and deliver a North Ayrshire that is fair for all.
4 Proposals 
4.1 The Audit and Scrutiny Committee agrees to approve the Council Plan 2023-28
Performance Management Framework attached at Appendix 1.
172

Page 173

5 Implications/Socio-economic Duty 
Financial
5.1  There are no financial implications arising from this report.
Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 There are no legal implications arising from this report.
Equality/Socio-economic
4.4. There are no equality/socio-economic implications arising from this report. 
Climate Change and Carbon
5.4 There are no climate change and carbon implications arising from this report.
Key Priorities
5.5 The Performance Management Framework provides a robust basis for
scrutinising the delivery of our Council Plan strategic priorities for the next five
years.
Community Wealth Building
5.6 There are no Community Wealth Building implications arising from this report.
6. Consultation 
6.1 Consultation was undertaken with Chief Officers. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Team Manager (Corporate
Policy and Performance), on 01294 324035 or email IslaHardy@north-
ayrshire.gov.uk.
173

Page 174

Our Council Plan
Performance Management
Framework 
August 2023
Appendix 1
174

Page 175

Contextual Indicators
These indicators provide context to the environment in which we operate.  They form part of the
Inclusive Growth Dashboard which will be summarised in Council Plan 2023-28 repor�ng.
Description LGBF
Baseline
2022/23 
(or most
recent) Ambition
Popula�on No
134,220
(June
2021)
Increase
% of Children living in poverty a�er housing costs (LGBF) Yes 29%
(2021/22) Decrease
% of Households in Fuel Poverty No 28%
(2020/21) Decrease
% of working age popula�on in employment No
73.6%
(December
2022)
Increase
Propor�on of people earning less than the living wage
(LGBF) Yes 11.7%
(2021/22) Decrease
Area-wide CO2 Emissions (LGBF) Yes 5.43%
(2020/21) Decrease 
Council Plan Performance Indicators
These performance indicators are directly influenced by the work of our Council.  When considered
alongside the contextual indicators, ac�ons and case studies within repor�ng, they form a clear basis
for effec�ve scru�ny.
Description LGBF
Baseline
2022/23 
(or most
recent)
Target
2023/24
Target
2027/28
Number of residents participating in community learning
and development activity including youth work No 17,804 18,700 20,600
Percentage of children achieving their developmental
milestones at the time the child starts primary (LGBF) Yes 78.5%
(2021/22) 79% 80%
Average total tariff score of pupils living in the 20% most
deprived SIMD areas No 711
(2021/22) 714 TBD*
175

Page 176

Description LGBF
Baseline
2022/23
(or most
recent)
Target
2023/24
Target
2027/28
Overall average total tariff (Average tariff score: All Leavers) No 905
(2021/22) 908 TBD*
Average total tariff for Care Experienced Young People No 457 465 TBD*
Percentage of school leavers entering positive destinations
(LGBF) Yes 96%
(2021/22) 96.4% 97.5%
Number of unemployed people progressing into
employment supported by our Employability Service No 437 450 550
Percentage of procurement spent on local enterprises No 22.93%
(2021/22) 26% 27%
Number of new build housing units reaching completion (all
tenures) (Actual not cumulative) No 562 295 530
Number of empty homes brought back into use (Actual) No 123 200 200
Hectares of vacant and derelict land in North Ayrshire No 1,198
(2021/22) 1,094 1,000
Street Cleanliness (Street Cleanliness Index - percentage
clean) (LGBF) Yes 84.6% 87% 87%
(Overall) % of road network that should be considered for
maintenance treatment No 34.8% 34.8% 34.8%
Provided floor space of commercial/industrial space within
our Council portfolio (sq ft) No 400,991 404,755 435,600
Percentage of Council budget directed via participatory
methods No 2.74% 1.5% 2.5%
Number of Council assets under community management
(cumulative) No 49 54 65
Total installed capacity of low carbon heat and electricity
generation across the Council's estate (kW) (cumulative)
(LGBF)
Yes 11,680
(2021/22) 12,000 25,000
176

Page 177

Description LGBF
Baseline
2022/23 
(or most
recent)
Target
2023/24
Target
2027/28
Overall carbon emissions (tonnes) No 20,896 19,500 15,300
Proportion of council dwellings that are energy efficient
(LGBF) Yes 97.7%
(2021/22) 98.1%  99 % 
Length of new or improved active travel routes per annum
(metres) No 1,090 2,000 2,000
Number of trees planted under the North Ayrshire 2030
Tree Planting Strategy No 35,627 40,000 80,000
Proportion of operational buildings that are suitable for
their current use (LGBF) Yes 91.09%
(2021/22) 92.1%  92.5% 
Percentage of total household waste that is recycled
(calendar year as per SEPA) (LGBF) Yes 56.3%
(2021/22) 57% 57%
Percentage of Council dwellings that meet the Scottish
Housing Standards (LGBF) Yes 49.28%
(2021/22) 72.5%  99% 
Gross rent arrears (all tenants) as at 31 March each year as a
percentage of rent due for the reporting year (LGBF) Yes 7.14% 6.5% 4.5%
Percentage of income due from council tax received by the
end of the year (LGBF) Yes 93.34%
(2021/22) 94% 94% 
*The 2027/28 indicator and targets will be confirmed in response to the outcomes of the current
independent review of qualifica�ons and assessment. 
177

Page 178

178

Page 179

NORTH AYRSHIRE COUNCIL 
25 January 2024 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports Issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed between November and December 2023. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to
be put in place for the objective review of risk management and internal control. 
Internal Audit is an important element in this framework as it reviews internal controls
and offers Elected Members and officers an objective and independent appraisal of
how effectively resources are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal
Audit activity.  The submission and consideration of regular reports assists the
Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed between November
and December 2023.  Internal control reviews have been completed in respect of the
areas detailed in Appendix 1 to this report. The aim of these reviews is to provide
assurance that the internal control framework within the areas examined is appropriate
and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included
an action plan with recommendations for improving internal control.  Appendix 1
includes the report and action plan from each audit. 
2.3 The findings from two separate audit assignments are detailed at Appendix 1 to this
report and the levels of assurance for each are noted in the table below:  
Agenda Item 9
179

Page 180

Audit Title Assurance Level
Employee Services HR Payroll System
and Processes
Payroll Administration – Reasonable
Service Administration – Limited
ICT Supplier Management Reasonable 
2.4 With regard to the HR Payroll review, limited assurance was provided around
operational service administration. This is as a result of errors identified in the
recording of absence information by services, as well as the volume of overpayments
and manual corrections made by Employee Services as a result of delayed payroll
notifications from services. Testing was carried out across all services, and as there
was no pattern or particular services identified where this is causing an issue, an
action has been raised for Employee Services to issue reminders generally to all
services to ensure the timely and accurate provision of information. Automated
process are being implemented to assist with these weaknesses, including weekly
absence reports to help highlight where there may be errors in the recording of
absence, and regular reporting to Heads of Service to highlight overpayments in their
service areas. 
3. Proposals 
3.1 It is proposed that the Committee considers the outcomes from the Internal Audit work
completed between November and December 2023. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2023-2028.
180

Page 181

Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Laura Miller, Senior Manager (Audit, Fraud, Safety
and Risk), on 01294 324524. 
Background Papers
None.  
181

Page 182

EMPLOYEE SERVICES - HR/PAYROLL SYSTEM AND PROCESSES 
1 Background  
1.1 CHRIS21 is the HR Payroll system used by North Ayrshire Council. The
software is supplied by Frontier. 
1.2 Regular payroll transaction testing is carried out annually, therefore these
have been omitted from this audit. 
1.3 Employee Services are responsible for running payruns based on information
provided by Services. The onus is for managers to provide Payroll with timely
and accurate information and it is employees’ responsibility to ensure that they
have been paid the correct amount. 
1.4 As of October 2023, there were 7,584 employees on the payroll system. 
2 Objectives and Scope  
2.1 The objective of this audit was to establish:
• coverage of CHRIS 21 
• contract details of service levels and data protection
• segregation of duties and access controls
• security of sensitive data, and 
• ensure change requests are timely and accurate. 
3 Findings   
COVERAGE 
3.1 There are nine modules currently in use within the HR Payroll system. These
relate to HR information, payroll, fleet management, self-service and Public
Sector returns. 
3.2 Every NAC employee with corporate IT access has access to their own basic
information and their payslip via the HR21 self-service module. Employees
without IT access submit requests in writing by either email or post. 
CONTRACT  
3.3 The Frontier system was upgraded in November 2018. Due to the complex
nature of the Council’s Terms and Conditions of employment, there are few
alternative software providers who provide a capable and affordable system.
As a result, there is no plan to replace the HR Payroll system at this time. 
3.4 The contract is listed on the Licences Subscriptions Software Support Register
(LSSS Register). LSSS contract referencing is no longer used in procurement,
however at the time the Contract was placed on the Register, this was
acceptable.  A STAR will be required to remove the Contract from the Register,
and this is currently being completed by the Service.  (Action a)  
182

Page 183

3.5  There are 19 Frontier invoices on Integra related to the CHRIS 21 system
covering training, maintenance and consultancy costs. Maintenance costs are
linked to the Retail Price Index (RPI) either at 2% or the actual if higher.
Maintenance costs have increased from 3 years at 2% to 5% for the year
ending 2023, and 10% for year ending 2024. With current inflation fluctuations
this cost will continue to increase. 
ACCESS CONTROLS AND SECURITY 
3.6 At the time of the audit there were 475 CHRIS users with access to the HR21
self-service module, where they can view their payslips and P60’s . 
3.7 Policies and user guidance on the different CHRIS modules are available on
Connects. A user guide for the HR21 self-service module is available via the
HR21 homepage.  
3.8 IT CHRIS user report analysis identified two security levels: level 5 ‘all other
staff’, and level 9 ‘executive staff’ with a default user allocation of level 5. This
is to ensure that there is an appropriate hierarchal access control to system
records.  There are 865 forms available on CHRIS; at the time of the audit it
was confirmed that the Workforce Systems team are creating a screen tracker
document to allow them to track what screens are in use. The purpose of this
development is to enhance system security, eradicate screen duplication,
support customisation requests, and ensure only active screens are within user
profiles. 
3.9 During the audit the software provider issued an update to user passwords to
strengthen security controls. The new password settings are compliant with the
Council’s password configuration standards. 
3.10  Access is assigned based on job roles, however there are two generic logins
that could not be matched with active employees. (Action b) 
CHANGE REQUESTS  
3.11 Contractual changes are undertaken solely by the Employee Services team
within CHRIS. 
3.12 Employees with access to HR21 can update personal information such as
home address, emergency contact and bank details directly. Employees
without IT access are required to place their request in writing via email or by
post to the Employee Services team.  
3.13 Absences are recorded within the HR Payroll System. Managers are required
to complete an online form which is routed to either the Employee Services
team, (Place and Chief Executives) or the relevant Service admin team. Audit
testing of a sample of absence records identified errors in dates such as
incorrect start of the sickness absence and incomplete return dates. (Action c) 
3.14 Employee Services track and manage absence related amendments through
system reports.  
183

Page 184

3.15 There were 220 overpayments recorded in 2022/23 financial year with a
recorded value of £231,780.  The main cause of overpayments is late
information relating to sickness absence, termination of employment and
contractual changes. As a result, debtors invoices are raised and other retrieval
costs are incurred by NAC.  From a sample of 10 overpayments, 6 were due to
late notification by the Service and a further 4 by clerical errors from the
Service. Carrying out pay corrections can be resource intensive for the Payroll
team and can require escalation to senior team members to seek advice and
guidance on the best approach where cases are complex. In addition to the
impact to the Payroll team, additional teams with Financial Management are
required to take action. From the sample 1 case required 3 Employee Service
staff to intervene. (Action d) 
3.17 As a result of incorrect information being provided, the Employee Services
team require to process supplementary payments to employees where
contractual earnings have not been received. For the financial year 2022/23
there were 417 supplementary payments produced with a value of £327,033. 
3.18 A cross service sample of 26 supplementary payments identified that 10 were
because of the Service not completing the employee absence records. A
further 9 were new start pay advances, which can be requested as a support
when starting a new job and are recovered over their next 2 pays. In 1 case
there was a software error which is being monitored, 2 were Service errors and
4 were Employee Services errors, which after review resulted in changes of
procedure to prevent reoccurrence. 
3.19 The administration of these payroll corrections is time consuming and labour
intensive. On average the samples tested took 17 days to resolve, dependent
on how quickly information is returned - a complicated maternity correction
taking 58 days to resolve required 5 employee services staff’s intervention.
(Action d) 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to administration of
payroll processes. Where issues have been identified processes have been
amended to mitigate risks. 
Limited assurance was obtained to the timely administration by services to
provide accurate and timeous information to ensure the efficient and accurate
payroll runs.   
184

Page 185

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
185

Page 186

KEY FINDINGS AND ACTION PLAN
EMPLOYEE SERVICES - HR/PAYROLL SYSTEM AND PROCESSES 
Action a
Finding A STAR is required to remove the Contract from the, now out
of date, LSSS Register. 
Action Description Complete a Single Tender Action Request (STAR) and
provided to the  Procurement Team.
Risk Continued use of this programme is non-compliant with NAC
procurement standards.
Priority (1, 2, 3) 1
Paragraph Reference  3.4
Managed by Fiona Walker, Head of Service (People and ICT)
Assigned to Jackie Hamilton
Due Date 31/03/2024
Management Comment A STAR is currently being prepared to remove the Contact
from the LSSS register and ensure a contractual arrangement
is in place with Frontier for another term. 
Action b
Finding Generic accounts unassigned to individuals were identified.
Action Description Investigate generic accounts and ascertain requirement for
them to continue. Ensure Frontier user account is compliant
with NAC identification processes.
Risk Noncompliance with the Council’s IT and GDPR policies.
Priority (1, 2, 3) 2
Paragraph Reference  3.10
Managed by Fiona Walker, Head of Service (People and ICT)
Assigned to Jackie Hamilton
Due Date Complete
Management Comment There are two generic logon IDs, which are required by both
the Software provider and the Payroll Team.  The Software
provider's logon ID is locked unless they request access to it. 
The Payroll Team's logon on ID is view only to allow them to
interrogate payroll records for previous financial years.  A
generic view only logon ID is used to avoid any corruption to
the historical data. Based on the purpose of these logons
there is limited risk to the Council’s IT and GDPR policies. 
186

Page 187

Action c
Finding Inaccurate absence information recorded on CHRIS
Action Description Managers should be reminded of the requirement to record
absences completely and accurately.
Risk Pay entitlements may be impacted by erroneous information
resulting in both over and under payments of earnings. 
Additional officer time processing corrections.
Priority (1, 2, 3) 1
Paragraph Reference  3.13
Managed by Fiona Walker, Head of Service (People and ICT)
Assigned to Jackie Hamilton
Due Date Complete
Management Comment Senior Managers & Heads of Service are issued with an
automated report on a weekly basis providing details of
absences within their area. Senior Managers should review
the data within the report and where they identify any issues
advise the relevant admin team of required correction.
The Employee Service team have created a report to check
for errors in dates entered within the HR Payroll System. The
report is run on a weekly basis, where discrepancies are
found the error will be directed to the relevant service
responsible for data entry to correct. 
Action d
Finding 637 payroll overpayments and manual corrections, with a
value of £558,813, were identified by Employee Services in
the 2022/23 financial year.
Action Description Employee Services should use information records to report
to Heads of Service on performance annually/bi-annually to
improve standard of payroll notifications.
Risk • Overpayments are incurred and not recovered.
• Additional time is required to correct errors, including
complicated manual calculations
• Additional recovery costs are incurred.
Priority (1, 2, 3) 1
Paragraph Reference  3.15 and 3.19
Managed by Fiona Walker, Head of Service (People and ICT)
Assigned to Jackie Hamilton
Due Date 31/3/2024
Management Comment A screen is being developed in the HR Payroll system to
record details of overpayments (currently recorded within a
spreadsheet). This development will allow for an automated
report to be issued to Heads of Service on a 6-monthly basis
providing details of overpayments within their Service
including the reason and amount. Heads of Services will be
advised in advance of this process commencing and
requested to reinforce the importance to their managers of
submitting timely and accurate information. 
187

Page 188

Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
188

Page 189

ICT SUPPLIER MANAGEMENT 
1 Background  
1.1 The audit program was based on the Public Sector Cyber Resilience Framework
refresh document.  Section 3 of this framework covers Supplier Management, the
main objective being to ensure the Council understands and manages security
risks that arise as a result of dependencies on external suppliers and third party
services.   
1.2 The audit included 3rd party suppliers that IT Services are responsible for
managing and also a small sample of recent contracts for cloud-based systems. 
1.3 The audit involved testing within IT Services and Procurement.  
1.4 The Procurement Manual provides clarity on how NAC should procure its goods,
works and services to ensure best value is achieved.  The manual must be used
by all staff involved in the Procurement process.  A list of NAC contracts and
framework agreements are detailed within NAC’s corporate contract register.  A
framework agreement is a general term for agreements with suppliers that set out
terms and conditions under which specific purchases (call-offs) can be made
throughout the term of the agreement. 
1.5 The Senior Manager (Corporate Procurement) advised a Terms and Conditions of
Contract for Information Communication Technology (ICT) Services has recently
been finalised and is now available on the Conditions of Contract Procurement
page of Connects.  This is based on the Scottish Government ICT Terms and
Conditions. 
2 Objectives and Scope  
2.1 The objectives of the audit were to ensure that:
• The Council has defined the respective duties and responsibilities of third-
party suppliers and the supply chain and these are understood and agreed by
all parties.
• There is visibility and control on third-party users that can access Council
systems, services and information data and these are appropriately verified,
authenticated and authorised.
• The Council has security embedded within procurement procedures.
• The Council has security embedded in cloud-based services.  
2.2 The supply chain assurance section of the Cyber Resilience Framework for ICT
Supplier Management will be included in an upcoming Business Continuity audit.    
3 Findings   
Roles and Responsibilities  
3.1 The Terms and Conditions of Contract for ICT Services has recently been
finalised and is now available on the Conditions of Contract Procurement page of
Connects.  This will be issued for all relevant contracts involving ICT Services that
189

Page 190

are not part of a framework agreement.  The Terms and Conditions of Contract
for ICT Services is based on the Scottish Government ICT Terms and Conditions
and adequately covers the requirements of the cyber resilience framework for
ensuring the roles and responsibilities of each party are included as part of the
contract.   
Access Control  
3.2 During the audit, IT Services updated their documented process for third parties
requiring temporary access to Council systems and servers to support our IT
operations.  This access is granted via a Virtual Private Network (VPN)
connection which needs to be set up by IT Services.  Access is restricted to the
minimum access necessary.  Once set up the third party will need to request the
VPN connection is opened and unless additional time is requested, the
connection will be automatically closed at 6pm the same day. VPN connections
are decommissioned when no longer required.  All such requests are now on
Hornbill, the IT Services Portal.  
3.3 The initial request to set up a VPN connection requires the third party to sign the
third Party Acceptable Use Policy.  IT Services provided a list of current VPN third
party users and advised most of them were historically set up and may not be
able to provide evidence they have signed the 3rd party Acceptable Use Policy
(AUP).  Internal Audit and IT Services agreed that all current suppliers on the
VPN list would be asked to sign up to the third party AUP to ensure this evidence
was up to date and available.  A Microsoft Form is now completed for such
purposes which provides an electronic audit trail of who has signed this form and
when.  There are 29 suppliers on the VPN list and 11 of them have at least 1 user
that has signed this policy and 18 of them have no users that have signed this
policy.  IT Services are actively chasing suppliers to ensure their users sign up to
the third party AUP.  
3.4 There are a number of non-Council employees that require permanent access to
the Council network and systems and as such, an active directory account is set
up which grants network access.  A request to set up an active directory account
is logged on Hornbill and the Hornbill reference number is logged against the
active directory account along with the email address of the person who
requested the account to be set up.  This ensures there is an adequate audit trail
for such accounts. 
3.5 IT Services advised that the relevant NAC manager is responsible for notifying
when a non-NAC active directory account is no longer required.  IT Services also
have an automatic process in place to disable active directory accounts that have
not been used within 90 days.  IT Services provided an active directory report of
all non-NAC users and their last logged on date.  This testing found 1 Care at
Home (CAH) user who only has email on a mobile phone and never logs onto a
NAC device that has not used their email within the last 90 days.  IT Services are
looking into an automated process to remove CAH leavers.   
Security in Procurement  
3.6 The auditor reviewed the Procurement Manual which specifies which
procurement process to follow depending on the procurement value.  Although it
190

Page 191

covers procurement exercises that are below an estimated contract value of
£10,000, the Procurement Manual does not refer to the Information Governance
Procurement Framework (IGPF) for such low value procurements to ensure
information governance and IT, cyber and information security requirements are
considered. (action a) 
3.7 For procurement exercises that are above an estimated contracted value of
£10,000, the Procurement Manual requires a Request for Procurement Action
(RPA) form to be completed.  Section 5 of the RPA incorporates the Information
Governance and ICT Security requirements of the IGPF.  If Information
Governance implications are identified, the IGPF must be completed.  If ICT
security implications are identified, an IT, Cyber and Information Security
Schedule should be included in the procurement exercise.  This schedule
ensures the supplier declares compliance with baseline security standards and
obligations. If the supplier has identified any areas of non-compliance, the
Council’s ICT Security Officer will undertake a risk assessment where detailed
mitigating controls and evidence have been provided.  
3.8 There is no version control on the IGPF so it is unclear when it was last updated. 
Although it is called the Information Governance Procurement Framework,
section 1 covers Information Governance, section 2 covers IT, Cyber and
Information Security and section 3 covers Information Technology Considerations
so the title does not refer to the ICT cyber security considerations.  The IGPF
should be reviewed in consultation with Corporate Procurement and updated to
ensure it is still fit for purpose.  This update should incorporate who to contact for
help or advice when completing this framework.  Consideration should also be
given to renaming the framework.  (action b)  
3.9  There is a risk that services purchasing IT related services and data hosting
solutions as well as enhancements or upgrades to existing provisions do not
follow the proper procurement process and the IGPF is not followed which could
result in information governance and IT, Cyber and Information Security
requirements not being considered.  As more IT systems move to cloud-based
services, there is a greater need to consider information governance and ICT
cyber security requirements.  The IGPF is only available on the Procurement
pages of Connects and is not included in the IT Services or Information
Governance Connects pages.  Once the IGPF is refreshed, services should be
reminded that for all purchases, regardless of value, there is a requirement to
complete the IGPF.  Internal Audit recommends this should be done via News in
Brief and a MetaCompliance message. (action c)  
3.10 Information Governance advised they started a review of the IGPF in October
2023 which will review the current process by removing duplication and adding
further guidance to signpost services to the relevant teams, contacts and
processes.  An action plan has been produced after an initial meeting with
Procurement.  The findings of this audit will be incorporated into this review.   
3.11 There were 2 IT contracts selected for audit testing and neither had a completed
IT, Cyber and Information Security Schedule in the Procurement folder.  The
Information Governance Procurement Framework states “where a supplier has
not received this schedule as part of a procurement exercise it may be included
within the contractual arrangements.”  Both contracts were mini competitions from
191

Page 192

the Crown Commercial Services Frameworks and IT Services and Procurement
advised that IT security requirements were included within the contractual
arrangements and this schedule was not required.  Although the proper
procurement process was followed, there was no evidence in the Procurement
folder to note why this schedule was not included in the tender documentation.  It
is recommended the IGPF checklist is updated to include a section to record
where the IT, Cyber and Information Security Schedule is not required and the
reason for this.   (action b)     
Security in Cloud Services  
3.12 The auditor selected 2 contracts for the provision of cloud-based systems, and
both were a Crown Commercial Service G-Cloud 13 Call-Off Contract.  The
supplier had completed the IT Cyber Information Security Schedule which
confirmed compliance with the NCSC’s 14 principles of the Cyber Security
Requirements for Cloud Service providers.  In addition, the call-off contract
ensures compliance with the same cloud security principles.  
3.13 The Public Sector Cyber Resilience Framework recommends the Cloud Service
Provider should specify and document the physical geographic locations of data,
including any locations in which data is processed or backed up.  It should be
noted that the 2 call-off contracts in the sample do not record the location of the
data being processed and backed up in the contract documentation.  (action b) 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the testing carried out
for ICT supplier management.  The biggest risk is the Information Governance
Framework not being followed which could result in data security and ICT cyber
security requirements not being considered. Implementation of the audit actions
should strengthen the controls around this process.    
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for
improvement were identified which may put at risk the achievement of
objectives in the area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives
in the area audited.
None Immediate action is required to address fundamental gaps, weaknesses
or non-compliance identified. The system of governance, risk
192

Page 193

management and control is inadequate to effectively manage risks to the
achievement of objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
193

Page 194

KEY FINDINGS AND ACTION PLAN
ICT SUPPLIER MANAGEMENT 
Action a
Finding The Procurement Manual does not refer to the Information
Governance Procurement Framework (IGPF) for
procurements with an estimated value of under £10,000 to
ensure information governance and IT, cyber and information
security requirements are considered.
Action Description Once the IGPF has been updated, the Procurement manual
should be updated to signpost the refreshed framework for all
procurements, the RPA should be updated to reflect the
refreshed framework and the Procurement page on Connects
should be updated to signpost the refreshed framework for all
purchases regardless of value. 
Risk Data security and ICT cyber security requirements have not
been considered which could result in a data breach or a
cyber security breach. 
Priority (1, 2, 3) 2
Paragraph Reference  3.6
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Quinn, Senior Manager (Corporate Procurement)
Due Date 07/05/24
Management Comment The Corporate Procurement Unit will update The
Procurement Manual, RPA and relevant information on the
procurement Connects page to refer to the updated IGPF one
week after the IGPF has been refreshed. 
Action b
Finding There is no version control on the IGPF so it is unclear when
it was last updated.  Although it is called the Information
Governance Procurement Framework, section 1 covers
Information Governance, section 2 covers IT, Cyber and
Information Security and section 3 covers Information
Technology Considerations, so the title does not refer to the
ICT cyber security considerations.  The Public Sector Cyber
Resilience Framework recommends the Cloud Service
Provider should specify and document the physical
geographical location of data, including any locations in which
data is processed or backed up.  It should be noted that the 2
call-off contracts in the sample do not record the location of
the data being processed and backed up.  
Action Description The IGPF should be reviewed in consultation with Corporate
Procurement and updated to ensure it is still fit for purpose. 
This update should incorporate who to contact for help or
advice when completing this framework. The update should
also prompt the user to only consider suppliers where the
geographical location is compliant with GDPR regulations of
data and ensure this information is captured during the
procurement process.   Consideration should also be given to
renaming the framework.  The IGPF checklist should be
194

Page 195

updated to include a reason if the IT, Cyber and Information
Security Schedule is not required.  
Risk Services do not know who to contact for advice from the
experts.  The jurisdiction where the data is stored is not
known and may not have adequate protections for personal
data.  
Priority (1, 2, 3) 2
Paragraph Reference  3.8, 3.11, 3.13
Managed by Aileen Craig, Head of Service (Democratic) and Fiona Walker,
Head of Service (People & ICT)
Assigned to Brendan Quigley, Senior Manager (IT Services) and Lauren
Lewis, Information Governance & Data Protection Manager
Due Date 30/04/2024
Management Comment IT Services and Information Governance will work together
with the Corporate Procurement Unit to review and update the
IGPF. 
Action c
Finding There is a risk that services purchasing IT related services
and data hosting solutions as well as enhancements or
upgrades to existing provisions do not follow the proper
procurement process and the IGPF is not followed which
could result in information governance and IT, Cyber and
Information Security requirements not being considered.  As
more IT systems move to cloud-based services, there is a
greater need to consider information governance and ICT
cyber security requirements.  The IGPF is only available on
the Procurement pages of Connects and is not included in the
IT Services or Information Governance Connects pages.  
Action Description Once the IGPF is refreshed, services should be reminded that
for all purchases, regardless of value, there is a requirement
to complete the IGPF.  Internal Audit recommends this could
be done via News in Brief and a MetaCompliance message. 
In addition, a link to the IGPF should be added to the IT
Services and Information Governance pages on Connects.
Risk Data security and ICT cyber security requirements have not
been considered which could result in a data breach or a
cyber security breach. 
Priority (1, 2, 3) 2
Paragraph Reference  3.9
Managed by Aileen Craig, Head of Service (Democratic) and Fiona Walker,
Head of Service (People & ICT)
Assigned to Brendan Quigley, Senior Manager (IT Services) and Lauren
Lewis, Information Governance & Data Protection Manager
Due Date 30/04/2024
Management Comment IT Services and Information Governance will work together
with the Corporate Procurement Unit to issue communication
in relation to the updated IGPF and to remind services that
the IGPF should be completed for all purchases, regardless of
value. 
195

Page 196

A link to the IGPF will be added to the IT Services and
Information Governance pages on Connects. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement
of the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no
material impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
196