Scottish Hydro Electric Transmission Plc: Section 42 Application for Variation of Condition 7 Relative to Planning Permission Reference 23/00382/Pp (Erection of High Voltage Electricity Substation and Formation of Associated Access, Landscaping, Drainage and Means of Enclosure and Platform Extension): Land Adjacent to Crossaig Sub Station, Skipness (Ref: 24/01098/Pp)

Argyll and Bute Council · 23 October 2024
Back to Planning, Protective Services and Licensing Committee — 23 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the Town
and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
relative to applications for Planning Permission or Planning Permission in Principle 
Reference No: 24/01098/PP
Planning Hierarchy: National Application
Applicant: Scottish Hydro Electric Transmission Plc
Proposal: Section 42 Application for variation of condition 7 relative to planning
permission reference 23/00382/PP (Erection of high voltage electricity
substation and formation of associated access, landscaping, drainage and
means of enclosure and platform extension
Site Address:  Land Adjacent To Crossaig Sub Station, Skipness    
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• A substation platform extending approximately to 2.4 ha for the new Crossaig North  
substation;
• A 275 kV Gas Insulated Switchgear (GIS) Building, maximum height 16m;
• A 132 kV Gas Insulated Switchgear (GIS) Building, maximum height 16m;
• Installation of two 275/132 kV supergrid transformers (SGT), rated at 480 MVA, each located
in a ventilated building of maximum height 18m;
• Installation of two gantries and electrical equipment to connect the OHL and the proposed
substation;
• A temporary works area (TWA) adjacent to the substation site, of approximately 3 ha and
areas for temporary peat storage;
• Diesel Generator and 2 automatic voltage regulators;
• Borehole for water and septic tank;
• Turning and parking areas;
• Use of existing forestry access tracks (those being the existing Cross Kintyre Haul Road and
Cour Estate track), approximately 25 km in length to enable access to the existing Crossaig
substation. Ongoing maintenance of this track will be required;
• Construction of a section of permanent access track, approximately 660 m in length between
the existing Crossaig substation and the proposed Crossaig North substation and for access
to the SuDS pond;
• A 2.4 m high security fence of palisade construction around the substation perimeter; and
• Foul and surface water drainage (Sustainable Drainage System (SuDS) pond and outfall
pipe);
• An extension to the south of the substation platform at the existing Crossaig substation of
approximately 0.13 ha to support electrical equipment and associated access

Page 2

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
(ii) Other specified operations
• Tree felling and compensatory planting 
Works are also required within the existing Crossaig substation platform to which Permitted
Development rights apply. Those include: 
• construction of a single storey building extension to accommodate expansion of
the existing protection room
• Installation of underground 132kv interconnector cables between existing
substation and proposed substation. 
(B) RECOMMENDATION:
Having due regard to the relevant policies within  LDP 2, NPF 4 and all other material
considerations, it is recommended that planning permission be granted, in accordance with
Section 42 of the Town and Country Planning (Scotland) Act 1997, subject to the conditions
and reasons detailed in this report.   
(C) CONSULTATIONS:   
SEPA – (Dated 24.07.24) -  No objection to rewording of condition 07
Nature Scotland – (Dated 19.07.24) - No comment Offered.
Transport Scotland Dated 26.07.24 -  No objection
WoSAS (Dated 22.07.24) – No Comment as archaeology condition submissions on original               
consent already approved by WoSAS
Area Roads Engineer (Dated 01.08.24)  – No comments 
Tarbert and Skipness Community Council – No response
Environmental Protection – No Response
Biodiversity Officer – No Response
HESS – No response
Access Manager – No response 
(Officer Note* As all details in respect of approval 23/00382/PP remain the same the critical consultee
response in respect of rewording condition 07 relating to peat management proposals is from SEPA 
who requested the wording used in the condition. They have responded with no objection) 
(D) HISTORY: 
21/001884/PAN – Proposal of Application Notice for the erection of electricity substation Opinion
issued on 17.11.21. 
21/01642/SCREEN – Screening opinion for the erection of a 275kV gas insulated switchgear
substation. Opinion issued on 21.3.22 
23/00382/PP – Erection of high voltage electricity substation and formation of associated access,
landscaping, drainage and means of enclosure and platform extension Approve subject to conditions
27.06.23 
(E)      PUBLICITY:   
MREG20 – Regulation 20 Major Application Advert, Expired 23rd August 2024

Page 3

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
(F) REPRESENTATIONS:  No Representations Received 
(G) SUPPORTING INFORMATION:
• Habitat Management Environmental Plan
• Peat Management Plan 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the Conservation (Natural
Habitats) Regulations 1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) Sustainability Checklists (with reference to the requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
☐Yes ☒No
☐Yes ☒No  
(v) A report on the impact
of the proposed
development eg. Retail
impact, transport
impact, noise impact,
flood risk, drainage
impact etc:  
☒Yes ☐No 
• Peat Management Plan
• Habitat Management Environmental Plan 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30, 31 or 32: 
☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations over
and above those listed above which have been taken into account in the assessment
of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024)
Spatial and Settlement Strategy

Page 4

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 29 – Rural Development 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy 
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic Environment
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy 
Policy 30 – The Sustainable Growth of Renewables 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 37 – Development Utilising an Existing Private Access or Existing Private Road
Policy 39 – Construction Standards for Private Accesses 
Sustainable Communities 
Policy 55 – Flooding
Policy 58 – Private Water Supplies and Water Conservation 
High Quality Environment

Page 5

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular 3/2013. 
• Planning Advice Notes & Web-based Renewables Guidance 
• Renewable energy and climate change framework 
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017) and position Update dated 16.3.21 
• Scotland’s Draft Energy Strategy and Just Transition Plan: Ministerial statement (Dated
10.1.23) 
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• Views of statutory and other consultees,
• Planning history of the site 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental Impact
Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation (PAC): 
☐Yes ☒No 
(M) Does the Council have an interest in the site:  ☐Yes ☒No 
(N) Requirement for a pre-determination hearing: ☐Yes ☒No 
The opportunity to attend a pre-determination hearing is required to be offered in
relation to applications for planning permission for major developments which are
significant departures from the development plan and for all National Developments.
Their purpose is to allow the views of applicants and those who have made
representations to be heard before a planning decision is taken. The Planning
Authority has discretion over how hearings will operate in its area. The applicant and
consultee(s) who have offered response have confirmed that they do not wish to be
heard, therefore a Hearing will not be required. 
(O)(i) Key Constraints/Designations Affected by the Development:
• Peat
• Forestry Removal 
(O)(ii) Soils

Page 6

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Agricultural Land Classification:  Class ? / Unclassified Land / Built Up Area
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Class 4 indicated on Council Maps. Further site
specific information within submitted  Peat
Management Plan 
Peat Depth Classification:  N/A  : Refer to Fig 2.1 of Peat   Management Plan  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(O)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment) 
☐No 
Does the proposal include any replacement or
compensatory planting?
☒Yes
☒No details to be secured by condition
☐N/A  
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP2 Settlement Strategy
(tick all relevant boxes) 
☐Settlement Area
☒Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP2 Allocations/PDAs/AFAs etc: 
N/A 
(P) Summary assessment and summary of determining issues and material considerations
A Section 42 application is an application for a new planning permission for a development, but with
different conditions from those attached to a previous permission for that same development. In
determining such an application, the Planning Authority can only consider the changes to the
conditions on the previous permission. The principle of development is not under consideration and
the original permission under 23/00382/PP remains live. 
(i) Principle of Development
Planning Permission (ref. 23/00382/PP), to construct and operate a 132/275 kilovolt (kV) GIS
electrical substation and associated infrastructure, was originally granted on 21.06.2023. It should be
noted that works have now commenced on site, and these works are progressing in accordance with
the original approval and conditions to allow commencement of development have been discharged.

Page 7

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(ii) Proposed Development
The current application has been made under Section 42 of the Town and Country Planning
(Scotland) Act 1997, as the applicant wishes to amend the wording of condition 07 of the original
permission. 
Condition 7 was a condition required the submission of a Peat Management Plan to be discharged
in consultation with SEPA. SEPA have previously approved the proposed peat management plan
and the plan itself remains unchanged from the details that SEPA have already approved. The
condition is listed in full below. The wording that SSEN wish to amend by means of this S42
Application are highlighted in bold and underlined for ease of reference. 
7. No development shall commence until a detailed peat management and reinstatement plan has
been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to the
intended commencement of development date and include details of: 
The written consent of all landowners whose land is to be utilised. 
Methodology and volume of extraction, 
Phasing/timing of any works impacting peat. 
Quality/classification of Peat to be extracted. 
Details of any onsite peat re-instatement and /or enhancement 
Details of storage and transportation 
Details of the location, area, and condition of onsite or offsite peatland to be improved. 
Details of peat enhancement measures on this land 
Details of peatland restoration outcomes to be achieved. 
Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of approved
peatland management plan and retained in perpetuity unless with the written agreement of the
Planning Authority in consultation with SEPA. 
The restored area shall not be subject to any works or operations in the future to undermine the
objectives of the restoration objectives contained in the approved Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the objectives of the
necessary habitat and management plan set out at condition 08 below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement, reuse
and management of peat in accordance with NPF 4 Policy 5 (c) objectives. 
The proposed revised wording of Condition 07 is to 
7. No development shall commence until a detailed peat management and reinstatement plan has
been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to the
intended commencement of development date and include details of: 
This shall include details of: 
The written consent of all landowners whose land is to be utilised. 
Methodology and volume of extraction, 
Phasing/timing of any works impacting peat. 
Quality/classification of Peat to be extracted.

Page 8

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Details of any onsite peat re-instatement and /or enhancement 
Details of storage and transportation 
Details of the location, area, and condition of onsite or offsite peatland to be improved. 
Details of peat enhancement measures on this land 
Details of peatland restoration outcomes to be achieved. 
Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of approved
peatland management plan. The restored peatland shall be maintained in accordance with the
terms of the approved peat management plan for a period of 15 years, from commencement
of works under approved peat management plan. 
The restored area shall not be subject to any works or operations for a period of 15 years, from
commencement of works under approved peat management plan which would undermine the
objectives of the restoration objectives contained in the approved Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the objectives of the
necessary habitat and management plan set out at condition 08 below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement, reuse
and management of peat in accordance with NPF 4 Policy 5 (c) objectives. 
All relevant matters have been taken into account when assessing this further application. It is
considered that the proposal accords with the principles and policies contained within both the
adopted National Planning Framework 4 and the adopted Argyll and Bute Local Development Plan
2. The Section 42 application to amend the planning condition is considered acceptable, subject to
the retention and amendment of the remaining planning conditions in terms of all other applicable
material considerations. 
Taking account of the above, it is recommended that planning permission be approved subject to the
revised condition 07 as per the S42 application. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission or Planning Permission in Principle Should be
Granted: 
All relevant matters have been taken into account when assessing this further application. It is
considered that the proposal accords with the principles and policies contained within both the
adopted National Planning Framework 4 and the adopted Argyll and Bute Local Development Plan
2. 
All matters directly related to the variation sought are therefore considered to have been properly
addressed.  Taking account of the above and all relevant material considerations, it is recommended
that planning permission be approved subject to the revised condition 07 as per the terms of the
submitted S42 application. 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
N/A

Page 9

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland: ☐Yes ☒
No 
Author of Report: David Moore Date:07.10.24 
Reviewing Officer: Sandra Davies Date: 08.10.24 
Fergus Murray
Head of Development & Economic Growth

Page 10

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 24/01098/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development
The development shall be implemented in accordance with the details specified on the
application form dated 14.12.22; the Environmental Appraisal (December 2022),
supporting information and, the approved drawings listed in the table below unless the
prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act
1997.
Plan Title.                                                                        Version         Date Received
Site Location Plan (1:75000)                                                                 24.02.23
Red Line Boundary Plan (Fig 1.1)                                                         24.02.23
Revised Site Layout Plan 4534d-DR-P-0017                     Rev 5          26.05.23
Existing Substation Layout and
proposed Extension Plan       4543d-DR-P-0027                                  24.02.23
Septic Tank and Borehole Plan ( Fig
13) (1:2500) 31.03.23
Substation Compound Layout and
Electrical Section Locations 4534d-DR-P-0004                   Rev.2          24.2.23
275Kv Control Building Layout 4534d-DR-P0005                Rev 2          24.2.23
275kv Control Building Elevations 4534d-DR-P-0006          Rev.2         24.2.23
132kv Control Building Elevations 4534d-DR-P-0023          Rev.1         24.2.23
132kv Control Building Layout 4534d-DR-P-0022                Rev.1         24.2.23
Transformer Building Layout 4534d-DR-P-0020                   Rev.1         24.2.23
Transformer Building Elevations 4534d-DR-P-0019             Rev.1         24.2.23
Generator Building Elevations and Floor
Plan 4534d-DR-P-0009                                                         Rev.2         24.2.23
Electrical Layout Elevations 01 4534d-DR-P-0011               Rev.1         24.2.23
Typical Deer Fence and Gate 4534d-DR-P-0016 -                                 24.2.23
2.5m High Security Palisade Fencing
Details CE/34/2015                                                                Rev. E       24.2.23
Site Access Details 4534d-DR-P-0008                                  Rev.2         24.2.23
Proposed Site Access Profiles 4534d-DR-P-0021                 Rev.1        24.2.23
Proposed Site Profiles 4534d-DR-P-0018 Rev.1 24.2.23 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. No construction works shall be commenced until a Finalised Construction
Environmental Management Plan [CEMP] has been submitted to and approved in
writing by the Planning Authority, in consultation with SEPA and other consultees, as
appropriate. The development shall then proceed in accordance with the approved
CEMP unless otherwise agreed in writing by the Planning Authority. The CEMP shall
include:
a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b) Processes to control/ action changes from the agreed SM;

Page 11

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
c) Construction Environmental Management Plans (CEMPs) for the construction
phase covering:
i) Habitat and species protection, including ECoW Details, surveys and species
protection plans;
ii) Landscape and Mitigation Restoration Plan including compensatory planting (refer
to Condition 9);
iii) Pollution prevention and control;
iv) Dust management, including construction activity and vehicle movements;
v) Construction noise and vibration
vi) Temporary site lighting;
vii) Watercourse crossings;
viii) Site waste management
ix) Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of high flow
or high rainfall; and a programme of water quality monitoring;
x) Mapping of borrow pits and associated habitats identified for restoration;
xi) Invasive Non-Native Species Management Plan
xii) Emergency Response Plans;
xiii) Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and
xiv) Other relevant environmental management as may be relevant to the development
d) A statement of responsibility to 'stop the job/ activity' if a breach or potential breach
of mitigation or legislation occurs; and
e) Methods of monitoring, auditing, reporting and the communication of environmental
management on site and with client, Planning Authority, and other relevant parties. 
Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management Plan
(CTMP)and Phased Delivery Plan have been prepared and approved in writing by the
Planning Authority and Transport Scotland as the trunk roads Authority. The Plan shall
include details of: 
a) Approved access routes,
• All HGV construction traffic to use the Cross Kintyre Haul Route.
• The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road must not be used by HGV's.
• The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road may be used by LGV related to these works
b) Agreed operational practises (including avoidance of convoy movements,
specifying conduct in use of passing places, identification of turning areas, information
of wheel cleansing facilities, signage to be installed on the A83 warning of construction
traffic, signage or temporary traffic control measures to include for larger or abnormal
loads, reporting of verge damage);
c) The provision of an appropriate Code of Practice to drivers of construction and
delivery vehicles.
d) Abnormal load route surveys and finalised plan (including any accommodation
measures required including the removal of street furniture, junction widening, traffic
management). 
The development shall be implemented in accordance with the duly approved Traffic
Management Plan

Page 12

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
Reason: To minimise the interference with the safety and free flow of traffic on the
trunk road and to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk or local road network. 
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably
qualified person and shall provide for the recording, recovery and reporting of items of
interest or finds within the application site. Thereafter the development shall be
implemented in accordance with the duly approved details with the suitably qualified
person being afforded access at all reasonable times during ground disturbance
works. 
Reason: In order to protect archaeological resources 
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority.
Thereafter the development shall be carried out in accordance with the approved
details. 
Reason: In order to ensure that any potential adverse impacts on the functioning of
the local housing market and tourist accommodation to the detriment of the interests
of the local community are identified and mitigated in accordance with the
requirements of NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
7. No development shall commence until a detailed peat management and reinstatement
plan has been submitted to and approved by the Planning Authority in consultation
with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months
prior to the intended commencement of development date and include details of:

Page 13

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL  
(i) The written consent of all landowners whose land is to be utilised. 
(ii) Methodology and volume of extraction, 
(iii) Phasing/timing of any works impacting peat. 
(iv) Quality/classification of Peat to be extracted. 
(v) Details of any onsite peat re-instatement and /or enhancement 
(vi) Details of storage and transportation 
(vii) Details of the location, area, and condition of onsite or offsite peatland to be
improved. 
(viii) Details of peat enhancement measures on this land 
(ix) Details of peatland restoration outcomes to be achieved. 
(x) Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of
approved peatland management plan. The restored peatland shall be maintained in
accordance with the terms of the approved peat management plan for a period of 15
years, from commencement of works under approved peat management plan 
The restored area shall not be subject to any works or operations for a period of 15
years, from commencement of works under approved peat management plan which
would undermine the objectives of the restoration objectives contained in the approved
Peat Management Plan. 
The peat improvement works shall also be undertaken in accordance with the
objectives of the necessary habitat and management plan set out at condition 08
below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate
reinstatement, reuse and management of peat in accordance with NPF 4 Policy 5 (c)
objectives. 
8. No works to excavate any peat on the site shall be undertaken until a Habitat
Management and Enhancement Plan has been submitted to and approved by the
Planning Authority in consultation with its biodiversity advisor. 
Reason: To ensure that works result in habitat enhancement works being undertaken
in accordance with NPF 4 and LDP Objectives. 
9. No development shall commence until a detailed Compensatory Planting Plan (CPP)
and Long Term Forestry Management Plan (LTFMP) are submitted to and approved
in writing by the Planning Authority, in consultation with Scottish Forestry. The
approved CPP and LTFMP shall be implemented in full and in accordance with the
approved timing, unless otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal. 
10. No development shall commence, until a revised Landscape Planting Plan and
Maintenance Plan in accordance with BS EN ISO 11091:1999 has been submitted to
and approved in writing by the Planning Authority. The revised plans must include: 
a) A plan showing numbers and locations of each tree and shrub species;
b) Planting schedule to show for each species, the total number, type and size at
planting;

Page 14

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
c) Specification for planting to include ground preparation, planting operations and
protection from herbivores;
d) Compensatory planting scheme for tree loss
e) Schedule of implementation and phasing; 
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained
in accordance with the approved details. Any plant losses within the first five years will
be replaced at the next planting season. 
Reason: To ensure the development conserves and enhances the landscape
character and biodiversity interests of the area. 
11. Any watercourse crossings, hereby permitted, shall be designed to at least the
capacity of the existing channel and to the 1 in 200 year plus climate change flow and
an allowance for freeboard, unless otherwise agreed in writing by the Planning
Authority. 
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk. 
12. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of
the lighting units to be installed shall be specified, and any duly approved lighting shall
be installed in a manner which minimises illumination and glare outwith the boundary
of the application site. The completed site shall not be illuminated other than in the
event of staff being present on site. 
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
13. No development shall take place outside the following hours: 
07.00hrs and 19.00hrs Mon to Friday (inclusive)
07.00hrs and 18.00hrs Saturday 
No construction works shall take place on Sundays or Scottish Bank Holidays unless
as otherwise may be agreed in writing with Environmental Protection Officers in
advance of the operations 
Non-construction work and switching works can be carried out on Sundays and
Scottish Bank Holidays between the hours of 08.00 and 13.00. 
Reason: To minimise the impact of noise, generated by construction activities, on
occupiers of residential properties.

Page 15

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  24/01098/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1.   Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission
under Section 42 of the Town and Country Planning (Scotland) Act 1997 to vary a
planning condition (Condition 07) attached to the original consent for an electrical
substation, seeking a change to the wording of the condition 07 as set out in the main
report. 
1.2. The Approved Development under 23/00382/PP consists of the substation buildings and
electrical infrastructure, and associated works required to accommodate construction and
access. The development footprint for the proposed substation site once completed,
includes the substation platform, cut/fill embankments, access road, associated culverts,
Sustainable Urban Drainage System (SUDS) and OHL connecting down-leads and
towers. 
1.3. The site is located approximately 8 km southwest of the village of Claonaig in Argyll and
Bute, West Scotland and is 1 km from the Firth of Clyde. The Project would be accessed
from the A83 using existing private tracks known as the Cross Kintyre Haul Road and the
Cour Estate track. The Proposed Development is in an area of commercial forestry with
low conservation value, as well as an area of semi-natural broadleaved woodland with
higher ecological importance. It is situated approximately 1 km from the Firth of Clyde,
and approximately 500 m from the B842. 
1.4. Buildings will comprise steel portal frames with metal cladding and roof. There would be
some un-housed electrical switchgear and plant located within the platform area. The
substation would not be illuminated at night during normal operational activities.
Conditions will be imposed to ensure that appropriate materials and colouring are used in
respect of these buildings and other infrastructure. Flood lights would be installed but
would only be used in the event of a fault during the hours of darkness; or during the over-
run of planning works; or when sensor activated as security lighting for night-time access.
Details of any proposed floodlighting are subject to a condition. 
1.5. No physical or operational aspects of the previous application already approved by
Members will be altered by this S42 application which relates only to the wording of
condition 07. 
2. Consideration of Proposal 
2.1. Section 25 of the Town and Country Planning (Scotland) Act 1997 requires planning
applications to be determined in accordance with the development plan unless material
planning considerations indicate otherwise. The principle of development has been
established under the original permission and consequently, it is not necessary or
appropriate to revisit whether or not it is compliant with the settlement strategy. This is an
application to amend the requirements of the condition on an existing permission. In order
to address the determining issues, the key considerations are therefore: 
1. Compliance with the adopted Development Plan (s) and other planning policy

Page 16

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
2. Variation of the wording of condition 07 as proposed; and 
3. Any other material considerations 
3. Compliance with the Development Plan (comprising NPF 4 and LDP 2) 
3.1. The Development Plan has changed since the determination of the original application.
The Development Plan now comprises the adopted National Planning Framework 4
[NPF4], in addition to the adopted Argyll and Bute Council Local Development Plan 2,
2024 [LDP] and all statutory and supplementary guidance. 
3.2.  Although NPF 4 was formally adopted in Feb 2023 before the approval of 23/00382/PP
for the original scheme, LDP 2 was formally adopted in Feb 2024, since the proposal was
approved on 21.06.23.  Notwithstanding this, it should be noted that the original
application report of handling also considered the application against the policies of the
draft LDP 2 document, which have effectively been replicated in the adopted LDP 2 in
respect of the relevant policies. As approval of this current application would grant a fresh
planning permission for the proposals, it is necessary to address the relevant policy
framework for the application where the framework  differs from that of the previous NPF
4 and draft LDP 2 policy evaluation , in addition to addressing any relevant matters raised
by the  S42 application to amend Condition 07 and amend other relevant conditions which
the Planning Authority considers is necessary. 
3.3. As the proposals involve an amendment to an existing live consent, which has been
partially implemented at time of writing, there is no opportunity for the Planning Authority
to revisit the principle of the development, or any facets of the original permission that do
not form part of the proposed amendments.  Therefore, in this instance, the assessment
of the proposals relates solely to consideration of revisions to the wording of condition 07
as previously set out at Section P of this report. 
3.4. The main matters for the Council’s consideration are, therefore, whether the development
would continue to comply with the Development Plan (NPF 4 and LDP 2 policies) based
on the new suite of conditions.   
4.  National Planning Framework 4 
4.1 National Planning Framework 4 (NPF4) is Scotland’s national spatial strategy for Scotland. 
It sets out spatial principles, regional priorities, national developments, and national
planning policy.  NPF4 supports the planning and delivery of sustainable places, liveable
places, and productive places. As the proposal continues to seek permission for an
electrical substation to facilitate the transmission of existing and future renewable energy
projects within this part of Argyll and Bute, helping to tackle issues of climate change, it is
considered that the amended proposals continue to accord with the relevant policies of
NPF4. Of particular relevance is assessment against NPF4 Policy 5 – Soils, which includes
details on the approach required where development proposals would impact upon peat.
The amended application is considered to comply with NPF4 Policy 5. And importantly the
statutory consultee who requested the wording of condition 07 have raised no objection to
the proposed changes. The proposals therefore continue to comply with NPF 4 policy
requirements. 
5.  Argyll and Bute Local Development 2 
5.1. The original application was assessed against the policies of the draft Argyll and Bute
Local Development Plan 2, in addition to those of the adopted Argyll and Bute Local
Development Plan 2015. In terms of the minor changes to the previously approved and
conditioned scheme, consideration has been given to whether the proposals continue

Page 17

LDP2 format template March 4th 2024
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Classification: OFFICIAL
to comply with the provisions of the current adopted Local Development Plan.  Following
a detailed assessment of the application against the relevant policies of the adopted
Argyll and Bute Local Development Plan 2, and in particular Policy 79 - Protection of
Soil and Peat Resources, it is considered that the amended proposals are acceptable. 
5.2. The detailed assessment of the S42 application has fully considered impacts on
international, national and local designations, impacts on carbon rich soils, deep peat
and priority peatland habitat, economic benefits, contributions to renewable energy
targets, effects on natural heritage and ecology, landscape and visual impacts,
cumulative impacts, public access, the historic environment, tourism and recreation,
road safety and traffic, hydrology, water environment and flood risk, and environmental
protection.   
6.0      Conclusions 
6.1  The proposed development remains exactly the same as that approved and currently
under construction under the original Planning Permission, with no changes to the site
layout, proposed buildings, infrastructure or access arrangements. Full details of the
proposed development originally approved are contained in the Report of Handling for
permission ref: 23/00382/PP and available on the public access system.     
6.2  On the basis of all of the above, the proposal is considered to be consistent with policies
in both the National Planning Framework 4 (NPF4) and the Argyll and Bute Local
Development Plan 2. Therefore, it is recommended that the application to vary condition
07 attached to planning permission 23/00382/PP is granted, which effectively renews
that planning permission for a further three years.