North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee
A Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
will be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Monday, 15 June 2026 at 10:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.   Where possible, the meeting will be live-streamed
and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Call In: Revenue Budget 2025/26: Financial Performance to 31 March
2026
Submit report by the Head of Democratic Services to consider a call-in
request in respect of the decision taken by Cabinet at its meeting on
Tuesday 2 June 2026 advising of the financial performance for the
Council for 2025/26 (copy enclosed).
3 Call In: North Ayrshire Housing Acquisition Strategy
Submit report by the Head of Democratic Services to consider a call-in
request in respect of the decision taken by Cabinet at its meeting on
Tuesday 2 June 2026 on the proposed Housing Acquisition Strategy
2026-2031 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
4 Call In: Ardrossan Campus Project Update
Submit report by the Head of Democratic Services to consider a call-in
request in respect of the decision taken by Cabinet at its meeting on
Tuesday 2 June 2026 to note the current progress of the Ardrossan
Campus project, including current projections in relation to costs and
programme (copy enclosed).
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home,where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact  dataprotectionofficer@north-ayrshire.gov.uk
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee Sederunt
John Bell (Chair)
Donald Reid (Vice Chair)
Cameron Inglis
Shaun Macaulay
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney
Chair:
Apologies:
Attending:
3

Page 4

4

Page 5

NORTH AYRSHIRE COUNCIL 
15 June 2026 
Audit and Scrutiny Committee 
Title:    Call In: Revenue Budget 2025/26: Financial Performance to
31 March 2026 
Purpose:  To allow the Committee to consider a call-in request in respect
of the decision taken by Cabinet at its meeting on Tuesday 2
June 2026 advising of the financial performance for the Council
for 2025/26. 
Recommendation:  That the Committee considers the terms of the call-in and agrees,
or otherwise, to make a recommendation to Cabinet. 
1. Executive Summary 
1.1    In terms of the Scheme of Administration (Section 5), the Audit and Scrutiny Committee
has a remit to consider call-in requests and invite at least one of the Members who has
requested the reference to call-in to attend the Committee to explain the request. 
1.2 This report sets out the background to a call-in request in respect of the decision
taken by Cabinet at its meeting on 2 June 2026 in relation to the report on the
financial performance for the Council 2025/26. 
2. Background 
2.1 The Cabinet, at its meeting on 2 June 2026, considered a report on the financial
performance for Council 2025/26. Cabinet amended the recommendation to the report
by determining to allocate £1.496m of underspend to the 26/27 revenue budget with
the funds to be used to create an Our Places, Our Communities fund designed to
benefit all North Ayrshire communities with details of the fund being brought to council
on the 24th of June for debate and approval. 
2.2 A request was received in terms of the call-in procedure set out in the Council's
Scheme of Administration and Standing Orders, that the Audit and Scrutiny
Committee examine the decision taken by the Cabinet. 
2.3 The call-in request, which was signed by Councillors Cullinane, Foster and
Montgomerie is in the following terms: - 
Reason for call-in 
“In passing its budget, the Council set Council Tax bands at a level required to fund its
Agenda Item 2
5

Page 6

expenditure requirements, including prioritising investment in areas such as education
and roads. 
The £1.496million underspend should therefore not be spent on another of the
administrations pet projects, particularly when the evidence of the last four years
shows that these pots of money are not used in a timeous manner. 
Instead, the underspend should be returned to council taxpayers.” 
Desired Outcome 
“That the £1.496million allocated to an ‘Our Places, Our Communities fund’ be re-
allocated to provide a Council Tax rebate, reflecting the fact that our expenditure
requirements for 2026/27 have already been funded. 
Although this outcome proposes a Council Tax rebate, we acknowledge officers'
advice that as matters relating to setting Council Tax levels are reserved to Council
and that for this outcome to be implemented it will require a decision of Full Council,
including the suspension of 15.5 and 25.1 of Standing Orders Relating to Meetings
and Proceedings of the Council, as Council Tax was set within the last six months.
The Audit & Scrutiny Committee is asked to accept the call in and recommend that the
matter is referred by Cabinet to Council for further consideration and determination.” 
2.4 A copy of the original report presented to Cabinet on 2 June 2026 and the relevant
extract of the minute are attached as Appendix 1 to this report. A briefing note has
been provided by the Head of Service (Finance) and is attached at Appendix 2. 
2.5 The call-in request is valid for consideration by the Committee. The request was
received within the appropriate timescale, it was requested by three Elected Members
and details were provided on both the reason for the call-in and the desired outcome. 
2.6 The Elected Members who have submitted the call-in will be invited to address the
Committee to explain the respective call-in request.  The appropriate Cabinet Member
will then be invited to clarify the reasons for the decision. The relevant senior officer
will also be present to provide information on the report presented to Cabinet and on
issues raised by the call-in received. The Committee will have an opportunity to ask
questions of both parties and of those officers in attendance. 
2.7 The Committee will then debate the call-in request and decide whether or not it agrees
with the decision of the Cabinet. 
2.8    The Audit and Scrutiny Committee:- 
i) decides if it agrees or not with the decision of the Cabinet; and
ii) if it does not agree with the decision, considers what alternative action the
Committee would recommend to the Cabinet. 
2.9   If the Committee supports the decision of Cabinet and does not accept the call-in, the
original decision of Cabinet remains in effect, and no further procedure is required. 
6

Page 7

2.10 If the Committee accepts the call-in, the matter is referred to Cabinet with a
recommendation. When the matter is considered by the Cabinet, the Chairperson or
another member of the Audit and Scrutiny Committee will have the right to attend the
Cabinet and speak in support of any recommendation. 
2.11 In the event that Cabinet declines to accept the recommendation from the Audit and
Scrutiny Committee, the matter will be referred to Council for determination. The
decision of the Council will be final. 
3. Proposals 
3.1 It is proposed that the Committee considers the call-in request. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are outlined in the Revenue Budget 2025/26: Financial
Performance to 31 March 2026 report attached at Appendix 1. 
Human Resources 
4.2 The human resource implications are outlined in the Revenue Budget 2025/26:
Financial Performance to 31 March 2026 report attached at Appendix 1. 
Legal 
4.3 The legal implications are outlined in the Revenue Budget 2025/26: Financial
Performance to 31 March 2026 report attached at Appendix 1. 
Equality/Socio-economic 
4.4 The equality/social-economic implications are outlined in the Revenue Budget
2025/26: Financial Performance to 31 March 2026 report attached at Appendix 1. 
Climate Change and Carbon 
4.5 The climate change and carbon implications are outlined in the Revenue Budget
2025/26: Financial Performance to 31 March 2026 report attached at Appendix 1. 
Key Priorities 
4.6 The key priorities are outlined in the Revenue Budget 2025/26: Financial Performance
to 31 March 2026 report attached at Appendix 1. 
Community Wealth Building 
4.7 Any community wealth building implications are outlined in the Revenue Budget
2025/26: Financial Performance to 31 March 2026 report attached at Appendix 1. 
7

Page 8

Islands Communities Impact Assessment (ICIA) 
4.8 Any ICIA implications are outlined in the Revenue Budget 2025/26: Financial
Performance to 31 March 2026 report attached at Appendix 1. 
United Nations Rights of the Child (UNCRC) 
4.9 Any UNCRC implications are outlined in the Revenue Budget 2025/26: Financial
Performance to 31 March 2026 report attached at Appendix 1. 
Consumer Duty 
4.10 Any consumer duty implications are outlined in the Revenue Budget 2025/26:
Financial Performance to 31 March 2026 report attached at Appendix 1. 
5. Consultation 
5.1 None concerning this report. 
Craig Hatton
Chief Executive 
For further information please contact Shannon Wilson, Committee Services Officer, on
shannonwilson@north-ayrshire.gov.uk. 
Background Papers 
N/A
8

Page 9

NORTH AYRSHIRE COUNCIL
2 June 2026                                                                                  
Cabinet
Title: Revenue Budget 2025/26 : Financial Performance to 31
March 2026
Purpose: To advise Cabinet of the financial performance for the Council
for 2025/26.
Recommendation: That Cabinet agrees to:
(a) note the information and financial outturn position outlined
in the report;
(b) approve the earmarking of £7.691m identified at 2.4 to
meet future year commitments in accordance with funding
requirements;
(c) note the financial performance for the Health and Social
Care Partnership highlighted at 2.5; and
(d) approve the virements detailed in Appendix 8.
1. Executive Summary
1.1 The General Services Revenue Estimates for 2025/26 were approved by Council on
26 February 2025. The Housing Revenue Account (HRA) Revenue Budget for
2025/26 was approved by Council on 12 February 2025.
1.2  As part of the monitoring procedures to keep the Cabinet informed of the financial
performance of the Council, financial performance reports are presented on a regular
basis. This is the fourth report for 2025/26 and covers the period to the end of March
2026 (Period 12). Projections have been made to the year-end. This is the final
financial performance information on which the annual accounts for the Council will be
prepared.
1.3  At Period 12 the General Fund is reporting a net in-year underspend of (£2.014m),
(0.4%), after transferring resources to/from earmarked reserves This is an
improvement of (£0.334m) from that reported at Period 10 and is primarily related to
additional income, lower than anticipated employee costs within the Facilities
Management and Streetscene linked to staff turnover levels and lower than
anticipated utilisation of inflationary related provisions during the year. In recognising
that there continues to be volatility across certain areas of spend, linked to current
global events, this improved position has been partially offset by additional requests
for earmarking to meet anticipated cost pressures in 2026/27. The underspend will be
added to the General Fund Unearmarked Reserves which would increase the
Appendix 1
9

Page 10

available balance to 2.3% the revised General Services Revenue Budget which is
within the recommended range of 2 – 4%.  From the underspend, a total of £0.518m
is required to ensure unearmarked reserves are retained at a minimum level of 2%
within this range. Whilst the current level of unearmarked reserves remains at the
lower end of good practice, this still reflects a prudent position to help address areas
of significant risk to the Council through 2026/27, most notably through the financial
performance of the HSCP.
1.4  The Housing Revenue Account is reporting a net in-year underspend of (£3.943m),
(6.0%). This is a movement of (£1.617m) from the previously reported underspend at
Period 10. The movement is primarily related to reduced expenditure on property
costs and increased income. The underspend will be added to the HRA earmarked
balances to support service delivery in future years.
1.5  Work is ongoing to confirm the final Health and Social Care Partnership out-turn
position for the year, and the final confirmation of the NHS budget outturn is awaited.
The final outturn for the Council services element has been confirmed as an
underspend of £1.818m.  From this, £1.359m will be earmarked to meet future costs.
This leaves a £0.459m surplus to be added to the HSCP’s unearmarked reserves
bringing the reported position to a net break-even position. This is an improvement
of £1.941m from the previously reported Council services position.  A further report
will follow from the HSCP in the new year.
1.6 Management action is ongoing to address absence levels across services. However,
employee absence rates remain above targets, and there has been a marginal 0.9%
increase in days lost during the period when compared to the same period last year.
2. Background
General Fund
2.1   The Council set a balanced budget for 2025/26. In addition to the budget approved on
26 February 2025, earmarked funds of £85.088m were carried forward from 2024/25
for service expenditure in 2025/26 and beyond. These funds are reflected in the
figures within the 2025/26 financial performance reports as they are drawn down.
2.2 A net in-year underspend of £2.014m is reported, net of transfers to/from reserves.
The undernoted table details the final position on a service-by-service basis.
Service Expenditure
App
No.
Annual
Budget
£ million
Actual
Expenditure
to 31 March
2026
£ million
Variance
for year
(Fav)/Adv
£ million
Requests
for Carry
Forwards
£ million
Variance
after
Carry
Forward
(Fav)/Adv
£ million Note
Corporate Services 1 22.748 21.767 (0.981) 0.186 (0.795) (i)
Education 2 191.980 192.050 0.070 (0.193) (0.123) (ii)
Place 3 60.889 58.371 (2.518) 3.363 0.845 (iii)
Communities &
Housing 4 17.116 16.344 (0.772) 0.233 (0.539) (iv)
Other Corporate Items 5 15.971 10.781 (5.190) 3.357 (1.833) (v)
Sub Total 308.704 299.313 (9.391) 6.946 (2.445)
10

Page 11

Health and Social
Care Partnership 9 142.676 140.858 (1.818) 1.818 0.000
Balance for Services 451.380 440.171 (11.209) 8.764 (2.445)
Financing Charges 6 13.751 13.751 0.000 0.000 0.000
Contribution to Loans
Fund Reserve 6 10.187 10.187 0.000 1.500 1.500 (vi)
Total Planned
Expenditure 475.318 464.109 (11.209) 10.264 (0.945)
Aggregate External
Finance 6 (394.613) (394.637) (0.024) 0.000 (0.024)
Council Tax 6 (71.939) (72.984) (1.045) 0.000 (1.045) (vii)
Use of Earmarked
Funds 6 (8.766) (8.766) 0.000 0.000 0.000
Total Planned
Income (475.318) (476.387) (1.069) 0.000 (1.069)
Net Expenditure/
(Income) 0.000 (12.278) (12.278) 10.264 (2.014)
2.3 The reported Aggregate External Finance within Planned Income includes several
adjustments to Scottish Government funding from that reported at Period 10, as
detailed in the following table:
Movements on Planned Income
General
Revenue
Grant
£ million
Non
Domestic
Rates
£ million
Specific
Grants
£ million
TOTAL
AEF
£ million
Revised Budget at P10 (342.866) (42.606) (8.101) (393.573)
Pupil Equity Fund C/F 0.655 0.655
Discretionary Housing Payment
Undistributed (0.781) (0.781)
Teacher Pay Award (0.756) (0.756)
CSC Pay Uplift Adjustment 0.083 0.083
Revised Planned Income (344.320) (42.606) (7.446) (394.372)
2.4 Commentary on Significant Movements from Period 10
The Council's overall financial forecast against the revised budget is an improvement
of (£0.334m) from the previously reported position. A brief explanation of the
significant movements at a service level are outlined as follows:
(i) Corporate Services – underspend of (£0.795m), an improvement of
(£0.200m) from the previously reported underspend
The movement is primarily related to:
• Vacancy management across the services;
• Revisions to Statutory additions (£0.070m);
• Lower than anticipated ICT contract costs in-year (£0.067m).; and
• Underspend in Election costs (£0.081m)
11

Page 12

This has been offset by a request to Earmark £0.283m in relation to anticipated
ICT contract inflation in 26/27 (£0.138m), resources to support the outcome of a
Service review (£0.060m) and the carry forward of Election resources to support
the democratic process (£0.085m).
(ii) Education – underspend of £0.123m, a favourable movement of (£0.724m)
from the previously reported position
The movements are primarily related to:
• Increase in the underspend within Facilities management of £0.679m primarily
relating to vacancy management and reduced expenditure across supplies and
services.
• Reduction in the overspend within ASN of £0.402m as a result of reduced day
placement costs and a reduction in external residential placement numbers and
associated costs, through the work of the Brighter Pathways programme.
This has been offset by increased teacher costs across Primary and Secondary
Schools.
It is requested that £0.010m is earmarked to meet costs in relation to Furniture and
updated equipment for the Visual Impairment team in ASN.
(iii) Place – overspend of £0.845m, an increase of £0.434m from the previously
reported overspend
The movement is primarily related to:
• Funds received from the Extended Producer Responsibility Payment
(£1.087m) in accordance with the payment schedule.
• Increased underspend within Transport of £0.310m due to reduced
expenditure on repairs and maintenance, fuel and additional income.
• A favourable movement within Streetscene of £0.196m largely due to a
reduction in staff costs and increased income
• An over-recovery of Largs car park income as a result of the new pricing
structure.
This is offset by requests to earmark £1.939m, further to the £1.424m previously
approved, to support anticipated additional expenditure during 2026/27 in relation
to:
• Waste pressures and investments in accordance with Extended Producer
Responsibility funding requirements, £0.950m
• Programme of Fire risk Assessments and essential works, £0.400m
• Programme of Water Quality Assessments and essential works, £0.100m
• Largs Car Park income to be retained in Largs Car Park Fund, £0.104m
• Anticipated Fuel cost pressures in view of current global events, £0.274m
• Investment in Car parking infrastructure, £0.076m
• Provision for the Making Waves Festival, £0.035m
12

Page 13

Virements in relation to the realignment of budgets within Roads and
Employability have been included within Appendix 8.
(iv) Communities and Housing – underspend of £0.539m, an improvement of
(£0.139m) from the previously reported underspend
The movement is primarily related to:
• Increase in the underspend within Housing of £0.197m largely relating to
reduced Bad debt provision and write off costs.
• Reduced expenditure within connected communities of £0.261m relating to
lower than anticipated storm damage costs and service management of
budget lines to offset the impact of delay in implementing previously approved
libraries savings.
• Additional income within protective services of £0.255m
• Reduced expenditure on employee costs due to ongoing service redesign of
£0.094m
• An underspend due to the reprofiling of the local development plan into 2026-
27
• A surplus of £0.057m within Building services.
This has been partially offset by :
• An overspend of £0.314m in relation to demolition costs as a result of
significant fire damage at the Forum Centre Irvine.
• Requests to earmark £0.463m to support anticipated additional expenditure
during 2026/27 in relation to:
 Further anticipated costs in relation to the demolition of the Forum
centre following the major fire damage, £0.400m
 Local Development Plan, £0.043m
 Holiday Playschemes and Activities budget as part of a delivery
programme of activities in Summer 2026, £0.020m
(v) Other Corporate Items – underspend of £1.833m, an increase of (£0.757m)
from the previously reported underspend
The movement is primarily related to:
• Centrally held provisions not drawndown during the year, including pay
inflation, energy sustainability funding and energy cost provisions which have
been subject to ongoing volatility, even after allowing for a proportion of
advanced purchasing arrangements, (£2.041m)
• Workforce Planning cost provisions not required in year including Severance
costs and Equal pay £1.257m
• Funding to support ongoing Transformation activity secured as part of the
2025/26 Budget, not utilised in year £0.750m
This is offset by :
13

Page 14

• An overspend on insurance reflecting high level of excesses largely relating to
storm damage. £1.106m
• Requests to earmark £3.496m to support anticipated additional expenditure
during 2026/27 in relation to:
o Equal Pay Provision required to help address future risks, £0.494m
o Workforce Planning and Transformation resources required to
support ongoing programme £1.732m
o Property – Energy sustainability funding to address current volatility,
£0.500m
o DWP Housing Benefit Accuracy award, £0.018m
o Rapid Rehousing Transition Plan rolling programme £0.024m
o SG Resettlement programme funding £0.095m
o SG Nature Restoration funding £0.073m
o SG Island support funding £0.288m
o On-going Service re-design costs £0.031m
o SG NDR Empty Property Relief funding £0.241m
(vi) Contribution to Loans Fund Reserve – Overspend of £1.500m, an increase of
£1.500m from the previously reported position
In view of the current conflict in the middle east and the anticipated inflationary
impacts, the Bank of England forecast for interest rates now reflects an increase
from the current base rate of 3.75% up to 5.25% potentially during 2026/27. In
order to address the impact this will have on borrowing costs through 2026/27, it
is requested that £1.500m is earmarked and transferred to the Loans Fund
reserve.
(vii)Council Tax – over-recovery of (£1.045m), an increase of £0.448m from the
previously reported over-recovery
The movement reflects growth in the Council Tax base from additional new builds,
properties previously registered as self-catering holiday units for NDR purposes
that have come onto the Council tax register, and the impact of the application of
100% premium on Council tax for second homes when measured against the
original financial planning assumptions.
Health and Social Care Partnership
2.5 The final HSCP financial performance report for the year will be presented to the
Integration Joint Board on 18 June 2026 and will outline the 2025/26 financial
performance in more detail. Work is ongoing to confirm the final outturn position for
the year and the HSCP is awaiting final confirmation of the NHS budget outturn. The
final outturn for the Council services element has been confirmed as an underspend
of £1.818m.  £1.359m is to be earmarked to meet costs in relation to ADP, Whole
Family Wellbeing Fund, Community alarms, Magic Notes and Adult Social work
Restructure costs. This leaves a £0.459m surplus which is to be added to the
HSCP’s unearmarked reserves bringing the reported position to a net break-even
position.  This is an improvement of £1.941m from the previously reported Council
services position. A further report will follow from the HSCP in the new year.
14

Page 15

Absence Management 
2.6 The programme of work to monitor absence levels and effectively implement relevant
policies has been ongoing and initially resulted in a significant reduction in reported
absence levels across the Council. However, the year-end position shows a marginal
increase in days lost during 2025/26 when compared to 2024/25 i.e. 12.87 days lost
compared to 12.76 in 2024/25. The absence levels for the year exceed the target of
10.22 days. Within the Education Service, the number of days lost for teaching staff
has reduced by almost 8% when compared to the previous year (5.78 days compared
to 6.25 last year). The HSCP and the Communities and Housing directorate’s number
of days lost have increased by 20% and 4% respectively, with the Place directorate
showing a 14% improvement for the period. 
Risks 
2.7 Due to the anticipated outturn position of the HSCP in 2025/26, from the Council
services element, the level of HSCP unearmarked reserves will increase by £0.459m.
Moving forward into 2026/27, under the terms of the Health and Social Care
Integration Scheme, a recovery plan is required in order to address any projected
shortfalls in future years. There is a risk that, if the recovery plan is not successful, this
would have an impact on the level of financial contributions from the funding parties.
In such a circumstance the Council would be asked to make interim funds available.
The funding could be made available for repayment by the HSCP across a period of
future years or as an additional contribution. This HSCP position will continue to be
monitored through 2026/27, however, in view of the level of pressures faced by the
HSCP and the scale of savings required in 2026/27 to operate within available
resources, there is a risk that spend will exceed available resources. It is recognised
the Council’s underspend position 2025/26 will help provide a level of financial
mitigation to this risk. The other main risks are linked to current global events and the
potential impacts on inflation and interest rates through 2026/27. Again, to address
these, further mitigations through the earmarking of financial resources have been
included in the year end position. 
Housing Revenue Account 
2.8  The Housing Revenue Account budgeted for a breakeven position in 2025/26.  An
underspend of (£3.942m), net of transfers to/from reserves, has been reported. This is
an improvement of (£1.617m) from the previously reported position and is
summarised in the following table with further details provided in Appendix 7. The
underspend will be added to the HRA earmarked balances to support delivery of the
HRA Business Plan. 
15

Page 16

2.9 Commentary on Significant Movements from Period 10 
A brief explanation of the significant movements from the previous forecasts is
outlined as follows: 
(i) Property Costs – underspend of £1.092m, a favourable movement of 
(£1.250m) from the previously reported position
The movement is primarily related to reduced expenditure on Aids and
Adaptation, (£0.191m), Void Repairs (£0.276m), Planned and Cyclical
Maintenance (£0.466m) and Other Property Costs (£0.293m). 
(ii) Administration Costs – underspend of £0.212m, a movement of (£0.208m)
from the previously reported position 
The movement is primarily related to reduced expenditure on legal fees
(£0.103m), Central Recharges (£0.053m) and Insurances (£0.025m) 
(iii) Third Party Payments – underspend of £0.061m, a favourable movement of
(£0.122m) from the previously reported position
The movement is primarily related to reduced recharges from other Council
departments. 
(iv) Transfer payments – underspend of £0.053m, a movement of (£0.053m) from
the previously reported position
The movement is due to an underspend in disturbance allowances. 
(v) Other Expenditure – overspend of £0.398m, a movement of £0.398m from
the previously reported position
Housing Revenue
Account
Annual
Budget
£ million
Actual
Expenditure
to  31 March
2026
£ million
Variance for
year
(Fav)/Adv
£ million
Projected
Variance at
P10 
(Fav)/Adv
£ million Movement Note
Employee Costs 5.294 5.294 0.000 0.002 (0.002)
Property Costs 25.628 24.536 (1.092) 0.158 (1.250) (i)
Supplies and Services 2.145 2.130 (0.015) (0.006) (0.009) (ii)
Transport and Plant Costs 0.016 0.015 (0.001) 0.000 (0.001)
Administration Costs 2.114 1.902 (0.212) (0.004) (0.208) (iii)
Third Party Payments 3.832 3.771 (0.061) 0.061 (0.122) (iv)
Transfer Payments 0.177 0.124 (0.053) 0.000 (0.053)
Other Expenditure 0.550 0.948 0.398 0.000 0.398 (v)
Capital Financing 26.270 23.834 (2.436) (2.372) (0.064) (vi)
Gross Expenditure 66.026 62.554 (3.472) (2.161) (1.311)
Income (66.026) (66.496) (0.470) (0.164) (0.306) (vii)
Net Expenditure 0.000 (3.942) (3.942) (2.325) (1.617)
16

Page 17

The movement is due to an increase in the bad debt provision. 
(vi) Capital Financing Costs – underspend of £2.436m, a movement of (£0.064m)
from the previously reported position 
The movement is primarily related to revised loan charges reflecting the revised
profile of capital project delivery, leading to a lower level of in-year borrowing.
These funds will be required to support the HRA capital programme in future
years. 
(vii) Income – over recovery of £0.470m, a movement of (£0.306m) from the
previously reported position 
The movement is primarily related to an over-recovery in Council House rents
(£0.147m) and other income (£0.157m). 
3. Proposals 
3.1 It is proposed that Cabinet agrees to: 
(a) note the information and financial outturn position outlined in the report; 
(b) approve the earmarking of £7.691m identified at 2.4 to meet future year
commitments in accordance with funding requirements;
(c) note the financial performance for the Health and Social Care Partnership
highlighted at 2.5; and
(d) approve the virements detailed in Appendix 8. 
4. Implications/Socio-economic Duty 
Financial 
4.1 General Services
The final outturn position for the year is a net underspend of (£2.014m) after transfers
to and from earmarked reserves. 
Housing Revenue Account
The final outturn position for the year is a net underspend of (£3.942m). 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None.
17

Page 18

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Progress as outlined in this report has been approved by Executive Directors. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Service (Finance), on 01294
324560. 
Background Papers
Revenue Budget 2025/26: Financial Performance to 31 January 2026 – Cabinet 17 March
2026
18

Page 19

Appendix 1
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Chief Executive's Office
Chief Executive's Office 197 214 17 9%
Total for Chief Executive's  Office 197 214 17
Financial Services
Change Programme 283 283 0 0%
Audit, Fraud, Safety & Insurance 701 688 (13) -2%
Corporate Procurement 815 566 (249) -31% 1        
Financial Services 1,749 1,634 (115) -7% 2        
Revenues (459) (546) (87) 19% 3        
Transformation 795 817 22 3%
Total for Financial Services 3,884 3,442 (442)
People & ICT
Employee Services 946 865 (81) -9% 4        
HR & Organisational Development 1,229 1,193 (36) -3% 5        
ICT 5,605 5,431 (174) -3% 6        
Business Support 1,594 1,554 (40) -3% 7        
Customer Services 4,759 4,700 (59) -1% 8        
Total for People & ICT 14,133 13,743 (390)
Democratic Services
Legal & Licensing 791 823 32 4%
Policy, Performance & Democracy 539 516 (23) -4%
Communications 503 507 4 1%
Civil Contingencies 60 59 (1) -2%
Committee Services 443 372 (71) -16% 9        
Member Services 1,560 1,528 (32) -2%
Information Governance 577 524 (53) -9% 10      
Ayrshire Area Support Team 61 39 (22) -36%
Total for Democratic Services 4,534 4,368 (166)
Net Totals 22,748 21,767 (981) -4%
Transfer to/ (from) Earmarked Reserves 97 283 186
Net Total 22,845 22,050 (795) -3%
19

Page 20

Appendix 1
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
£000  £000  £000
Employee Costs 18,290         17,858         (432)               -2%
Property Costs 85                118              33                  39%
Supplies and Services 3,462           3,174           (288)               -8%
Transport and Plant Costs 23                13                (10)                 -43%
Administration Costs 1,653           1,569           (84)                 -5%
Other Agencies & Bodies 2,274           2,209           (65)                 -3%
Transfer Payments 867              866              (1)                   0%
Other Expenditure -                   -                   -                     -
Capital Financing -                   -                   -                     -
Gross Expenditure 26,654         25,807         (847)               -3%
Income (3,906)          (4,040)          (134)               3%
Net Expenditure 22,748         21,767         (981)               -4%
20

Page 21

Appendix 1a
CORPORATE SERVICES
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Finance - Corporate Procurement
Movement: There has been a favourable movement of (£0.091m) since P10 mainly due to continued forecasted
underspends in employee costs and overrecovery of income.
815 (167)              -20% Employee costs: There is an underspend of £0.167m due to vacancy management.
(100) (60)                -7% Income: £0.060m overrecovery of income from Procurement cards and rebates from Scotland Excel contracts.
(22)                -3% Other minor movements.
(249)             
Note 2 Finance - Financial Services
Movement: There has been a favourable movement of (£0.066m) since P10 mainly due to an over recovery of
£0.052m in staff recharges.
1,456 (45)                -3% Employee Costs: Underspend of £0.045m mainly due to vacancy management.
(108) (53)                Income: £0.053m over recovery of staff recharges.
(17)                Other minor movements.
(115)             
Note 3 Finance - Revenues
Movement: There has been a favourable movement of (£0.070m) since P10 largely due to revisions to statutory
additions.
(1,385) (48)                3% Income: There is an overall increase in statutory additions of £0.048m.
(39)                Other minor movements.
(87)               
Note 4 People & ICT - Employee Services
Movement: There has been a favourable movement of (£0.010m) since P10 due to vacancy management.
900 (78)                -9% Employee Costs: There is an underspend of £0.078m due to vacancy management.
(3)                  Other minor movements.
(81)               
Note 5 People & ICT - HR & Organisational Development
Movement: There has been no significant movement from P10.
413 (35)                -8% Third Party Payments: There is an underspend of £0.035m due to Occupational Health charges.
(1)                  Other minor movements.
(36)               
Note 6 People & ICT - ICT
Movement: There has been a favourable movement of (0.067m) since P10 due to contract costs being less, Co-
Pilot trial being funded from change fund and Wi-Fi support not being completed.
5,605 (179)              -3%
Supplies and Services: There is an underspend of £0.205m due to contract costs being less than expected, Wi-Fi
support not completed in September due to negotiations of new product offset with a £0.010m overspend in WAN
cicuits due to increase in contract prices and £0.016m overspend in other supplies in services due to no computer
disposals.
5                   Other minor movements.
It is requested to earmark £0.138m underspend in software licenses and support. This funding would be used to
offset the unforeseen and significant increase in charges under the current WAN contract, estimated at £0.138m.
Earmarking these underspends will allow the service to manage this in-year budget pressure within existing ICT
resources, while progressing the planned procurement of a replacement WAN contract
(174)             
21

Page 22

Appendix 1a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 7 People & ICT - Business Support
Movement: There has been no significant movement from P10.
1,583 (36)                -2% Employee Costs: There is an underspend of £0.036m due to vacancy management.
(4)                  Other minor movements.
(40)               
Note 8 People & ICT - Customer Services
Movement: There has been no significant movement from P10.
3,069 (78)                -3% Employee Costs: There is an underspend of £0.078m due to vacancy management.
19                  Other minor movements.
It is requested to earmark £0.060m for service review costs in 2026/27.
(59)               
Note 9 Democratic Services - Committee Services
Movement: There has been a favourable movement of (£0.081m) since P10 mainly due to underspend in Election
Costs.
443 (85)                -19% Election Costs: There is an underspend of £0.085m in relation to Election Costs for 2025/26.
14                  3% Other minor movements.
It is requested to earmark  £0.085m for future Election commitments.
(71)               
Note 10 Democratic Services - Information Governance
Movement: There has been a small favourable movement of (£0.007m) from P10.
571 (60)                -11% Employee Costs: Underspend of £0.060m due to vacancy management.
7                   Other minor movements.
(53)               
22

Page 23

Appendix 2
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Final Year
End Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
Note
No
£000 £000 £000
Early Years Education 21,528           20,868           (660)              -3% 1
Primary Education 55,635           56,447           812               1% 2
Secondary Education 67,948           69,278           1,330            2% 3
Additional Support Needs 17,754           18,725           971               5% 4
Central Education 4,980             4,581             (399)              -8% 5
Scottish Equity Fund 152                152                -                    0%
Pupil Equity Fund 4,074             4,074             -                    0%
Facilities Management 19,909           17,925           (1,984)           -10% 6
191,980         192,050         70                
Transfer to/(from) Earmarked Reserves 203                10                  (193)             
Net Total 192,183         192,060         (123)             
Subjective Summary
Annual
Budget
Final Year
End Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs - Teachers 108,021         109,763         1,742            2%
Employee Costs - Non Teachers 53,190           51,976           (1,214)           -2%
Property Costs 1,921             1,803             (118)              -6%
Supplies and Services 25,328           24,797           (531)              -2%
Transport and Plant Costs 160                187                27                 17%
Administration Costs 827                845                18                 2%
Other Agencies & Bodies 10,017           11,059           1,042            10%
Transfer Payments 580                426                (154)              -27%
Other Expenditure 1                    1                    -                    0%
Capital Financing 71                  84                  13                 18%
Gross Expenditure 200,116         200,941         825               0%
Income (8,136)           (8,891)           (755)              9%
Net Expenditure 191,980         192,050         70                 0%
-                    -                    -                   
23

Page 24

Appendix 2a
EDUCATION
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance
as % of
budget Section
Note 1 Early Years Education
Movement : There has been an unfavourable movement of £0.041m since P10 mainly due to an increase of £0.058m in
employee costs.
15,895 (485) -3% Employee Costs: Overall an underspend of (£0.544m).
- Teachers:- underspend of (£0.055m.)
- Non Teachers:- underspend of (£0.430m) as a result of vacancy management after accounting for budgeted turnover.
5,341 (151) -3%
Third Party Payments: There are underspends of (£0.165m) in payments to funded providers due to a lower than
forecasted uptake of hours and a change in the charging model for cross boundary costs, partially offset by an
overspend of £0.024m in Speech Therapy costs.
(24) Other minor movements
(660)
Note 2 Primary Education
Movement : There has been an unfavourable movement of £0.162m since P10 mainly due to increased teacher costs
53,155 784 1%
Employee Costs : Overall an overspend of £0.784m
- Teachers:- overspend of £0.758m   Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- underspend of (£0.027m) after accounting for budgeted turnover.
28 Other minor movements.
812
Note 3 Secondary Education
Movement : There has been a unfavourable movement of £0.219m since P10 mainly due to increased teacher costs
51,940 1,412 3%
Employee Costs : Overall an overspend of £1.412m
- Teachers:- overspend of £1.289m. Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- overspend of £0.123m after accounting for budgeted turnover.
15,834 (109) -1% Supplies and Services: forecasted underspend in PPP unitary charge mostly due to a reduction in energy costs
27 Other minor movements.
1,330
Note 4 ASN
Movement: There has been a favourable movement of (£0.402m) since P10. (£0.207m) of this favourable movement is
in Day Placements as a result of the level of assessed needs varying for some young people, transport costs were less
than projected and rates for one provider were lower than projected. There has been a (£0.117m) favourable movement
in Residential Placements as there are less children in Residential Placements compared to P10, and there has been a
decrease in rates from P10 projection. There has also been a favourable movement of (£0.067m) in Employee Costs.
16,034 (321) -2%
Employee Costs :  Overall underspend of (£0.321m)
- Teachers:- underspend of (£0.246m). Pressures on this line include teacher absence cover, budgeted turnover and
teacher salary pay levels
- Non Teachers:- underspend of (£0.075m) reflecting the level of turnover within the service.
268 (32) -12% There is an underspend of (£0.032m) on payments to Other Local Authorities due to a reduction in the number of NAC
children accessing placements in their establishments.
1,310 (83) -6% Underspend of (£0.083m) on external day placements. Currently there are 31 children in day placement provision. This
service will continue to be monitored as options for alternative service provision are developed.
24

Page 25

Appendix 2a
Budget
£000
Projected
Variance
£000
Variance
as % of
budget Section
499 1,414 283%
There is an overspend of £1.414m on external specialist residential placements. Currently there are 9 children in
accommodation. Increased pressures on internal care settings, as well as changing needs of children and young people,
have resulted in an increase in the need for external residential settings. Joint working is ongoing with HSCP on the
Brighter Pathways Programme to ensure that all options are fully explored to retain young people within their local
community where possible. Where this is not possible, a forum has been set up to further discuss those young people
who will require care and education provision to support them appropriately.
(7) Other minor movements.
It is requested to earmark £0.010m to purchase furniture and updated equipment for the Visual Impairment team.
971
Note 5 Central Education
Movement:  There has been a favourable movement of (£0.075m) since P10.
4,015 40 1% Employee Costs: There is an overspend of £0.040m mainly due to unachieved turnover.
(1,407) (431) 31% Income:  There is an over-recovery of PPP insurance rebate of (£0.285m) and PPP deductions of (£0.156m) in excess of
budget.
(8) Other minor movements
(399)
Note 6 Facilities Management
Movement: There has been a favourable movement of (£0.679m) since P10.  This is mainly due to further employee
cost underspends and further underspends across supplies and services lines
15,642 (901) -6% Employee Costs: There is an underspend of (£1.232m) primarily due to previous vacancy management, offset by a
budgeted turnover target of £0.331m resulting in a net underspend of (£0.901m)
1,612 (58) -4% Property Costs: There is an underspend of (£0.058m) across cleaning materials budget lines
5,434 (445) -8%
Supplies and services: There is an underspend of (£0.445m). This comprises of underspends in kitchen equipment of
(£0.376m) and other supplies and services of (£0.160m) which is offset slightly by an overspend on food costs of
£0.138m.
2,892 (625) -22%
Income: There is an over recovery in Commercial Catering of (£0.191m). A targeted approach over the last few years
has seen this outturn position change from a significant under recovery in income to the favourable position shown this
year. Over recovery in Cleaning/janitorial income of (£0.218m) and school meals income of (£0.215m) linked to an
uptake in paid meals within secondary schools
45 Other minor movements
(1,984)
Note 7 General
Teacher absence levels are subject to regular review across the service and appropriate actions are being taken to
maximise attendance. Average days lost per FTE is 8.82 for the period April-March.  Average days lost per FTE for same
period last year was 9.33.  This reflects an improved position for the year.
25

Page 26

Appendix 3
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Objective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Directorate and Support 995 836             (159)              (16%) 1    
Neighbourhood Services
Roads 8,109 8,034          (75) (1%) 2    
Streetscene 5,875 5,753          (122)              (2%) 3    
Waste Resources 8,199 6,545          (1,654)           (20%) 4    
Municipalisation Advertising (73)             (29)              44 (60%)
Total for Neighbourhood Services 22,110       20,303        (1,807)          
Economic Development, Growth & Regeneration
Economic Policy 337 261             (76) (23%) 5    
Employability and Skills 2,274 2,274          - 0%
Regeneration 702 703             1 0%
Business 954 556             (398)              (42%) 6    
Growth & Investment 287 277             (10) (3%) 7    
Total for Economic Development, Growth &
Regeneration 4,554 4,071          (483)             
Sustainability, Transport and Corporate Property
Property Management & Investment 2,129 2,132          3 0% 8    
Housing Assets & Investment 95 - (95) (100%) 9    
Property Maintenance 4,709 4,848          139 3% 10  
Property Running Costs 6,653 7,287          634 10% 11  
Energy and Sustainability 7,679 7,679          - 0%
Internal Transport 11,965       11,215        (750)              (6%) 12  
Total for Sustainability, Transport and Corporate
Property 33,230       33,161        (69)
Net Total 60,889       58,371        (2,518)           (4%)
Transfer to Earmarked Reserves 3,363          3,363           
Net Total 60,889       61,734        845
26

Page 27

Appendix 3
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 31,558       32,297        739 2%
Property Costs 24,583       24,722        139 1%
Supplies and Services 4,548 4,634          86 2%
Transport and Plant Costs 10,638       10,997        359 3%
Administration Costs 703 933             230 33%
Other Agencies & Bodies 21,044       19,834        (1,210)           (6%)
Transfer Payments - - - 0%
Other Expenditure 78 90 12 15%
Capital Financing 26 26 - 0%
Gross Expenditure 93,178       93,533        355 0%
Income (32,289)      (35,162)       (2,873)           9%
Net Expenditure 60,889       58,371        (2,518)           (4%)
27

Page 28

Appendix 3a
PLACE
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Directorate and Support
Movement: There has been a favourable movement of (£0.104m) since P10. This relates to Largs Car Park, with
increased income and a decrease in operating costs.
981 (56) (6%) Employee Costs: There is an underspend due to vacancy management.
(212) (85) 40% Income: £0.085m over recovery of income in Largs Car Park, as a new pricing structure was introduced in 2025/26.
(18) Other minor movements.
There is an underspend of £0.104m in Largs Car Park and this will be retained for the Largs Car Park fund, to be used in
future years.
(159)
Note 2 Roads
Movement: There has been a favourable movement of (£0.075m) since P10 primarily due to a reduction in forecasted
winter and energy costs within supplies and services of £0.108m and additional over recovery of income of £0.181m. This
is partially offset by an adverse movement of £0.138m in third party costs due to reactive emergency unplanned
maintenance costs and £0.093m in employee costs.
4,877 58 1% Employee Costs: £0.058m overspend due to additional overtime.
31 91 294% Transport Costs: £0.090m overspend mainly due to hire charges in particular of a gully unit.
2,828 (115) (4%) Supplies & Services: Underspends of £0.100m in winter salt/grit costs and £0.052m in electrical power, partially offest by
overspends of £0.026m in materials and £0.017m in software licence costs.
1,070 144 13% Third Party Payments: overspend of £0.091m within Engineering Services due to reactive emergency unplanned costs
together with £0.040m Winter overspend due to weighbridge replacement costs and Millport gritting contract.
(1,631) (226) 14% Income: £0.163m over recovery of design fees income mainly due to project management fees for Road Safety
Improvement Funds and 20mph projects and £0.076m over recovery in Decriminalised Parking Enforcement income.
(27) Other minor movements.
It is requested to earmark £0.076m, the DPE net income, which will be reinvested in the car parking infrastructure.
(75)
Note 3 Streetscene
Movement: There has been a favourable movement of (£0.196m) since P10. Vacant posts and a reduction in overtime and
casual staff costs have contributed to a favourable movement of £0.130m in Employee Costs. Income has seen a
favourable movement of £0.052m, with increased income from other departments, interment and memorial permit income.
There has also been a favourable movement of £0.012m in Supplies and Services.
7,712 (285) (4%) Employee Costs: £0.285m underspend due to vacancy management. Management are currently recruiting to fill vacant
posts in 2026/27.
455 66 15% Supplies and Services: £0.066m overspend includes £0.041m for storm rectification works, £0.011m overspend on tools
and machinery and £0.014m overspend on PPE.
(2,886) 77 (3%) Income: £0.077m under recovery of income, which includes £0.050m under recovery of interment income and £0.022m
under recovery of memorial permit income.
20 Other minor movements.
(122)
28

Page 29

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 4 Waste Services
Movement: There has been a favourable movement of (£0.951m) since P10 due to £1.087m of funds received from the
Extended Producer Responsibility payment, partially offset by additional costs within supplies & services of £0.127m which
includes £0.082m of trade effluent costs.
5,616            799 14%
Employee costs: Current sickness absence rates for April 2025 to March 2026 are 20.26 days per employee, a reduction of
10.15 days per employee when compared to the same period last year. A robust absence monitoring process is in place
and a dedicated resource has been recruited to monitor and review the absence management process in Waste, through
assisting supervisors with absence management meetings, referrals to occupational health etc and to support employees
return to work. The statutory nature of the service requires additional resources and/or overtime to cover unforeseen
absences resulting in additional costs. To help mitigate against this, resources out-with Waste Collections have received
HGV training to help provide cover for collections.  An overall review of the Waste service in light of legislative changes
and current service demands is ongoing. The absence rates reflect an improving position, however they are still above
target rates.
245            368 150% Transport Costs: Additional vehicles are currently in place to deal with ongoing pressures and demands.  Transport needs
are continuously under review and flexed depending on the operational needs of the service.
671 10 1%
Supplies & Services: Overspends in trade effluent of £0.082m, software and computer equipment costs of £0.018m, and
materials/tools and implements of £0.011m have been partially offset by underspends in refuse containers of £0.055m and
leachate of £0.052m.
6,896          (125) (2%)
Third Party Payments: Underspends mainly from diverted waste of £0.114m due to a reduction in tonnages as a result of
the implementation of the HWRC booking system, the recyclables contract of £0.046m, the organics contract of £0.048m,
and the Clyde Valley Contract of £0.025m, this is partially offset by an overspend in Special Uplift processing costs of
£0.093m due to increased costs for POPs waste.
(5,413)        (2,679) 49%
Income:  Income from the Extended Producer Responsibility (£4.350m) for packaging funds currently exceeds the amount
included in the Budget by £2.843m. These funds were received in 3 tranches from November 2025 and have been
allocated to cover chargeable disposal costs. In 2025/26 these funds helped address the pressures faced by the service
and supported further investment to meet operational needs and deliver service improvements. These funds together with
an over recovery in special uplifts income of £0.077m, sale of scrap of £0.023m, and the sale of vouchers of £0.019m, is
partially offset by an under-recovery in purple bin contract income of £0.175m due to reductions in recyclate market prices,
commercial refuse charges of £0.074m and sale of bins of £0.035m.
(27) Other minor movements.
A further request to earmark funds of £0.950m is made to the P10 request of £0.703m (total £1.653m), these funds will be
utilised to support waste pressures and investments in accordance with EPR funding requirements.
29

Page 30

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
(1,654)
Note 5 Economic Policy
Movement: There has been a favourable movement of (£0.021m) since P10.
347 (84) (24%) Employee Costs: Underspend of £0.084m due to vacancy management and maximising available external funding.
8 Other minor movements.
(76)
Note 6 Business
Movement: There has been an unfavourable movement of £0.012m since P10.
975 (400) (41%) Income: £0.400m received from Business Loans Scotland for contributions to the West Of Scotland Loans Fund.
2 0% Other minor movements.
(398)
Note 7 Growth & Investment
Movement: There has been a favourable movement of (£0.010m) since P10.
193 (10) (5%) Third Party Payments: Underspend of £0.010m in budget for Events.
It is requested to earmark £0.035m to support the Making Waves festival 2027 to support an event of sufficient scale and
quality to promote the Great Harbour programme.
(10)
Note 8 Property Management and Investment
Movement: There has been adverse movement of £0.120m since largely due to an under recovery in project income
(£0.171m), partially offset by an increase in the employee costs underspend (£0.081m) due to vacancy management.
2,733 (253) (9%) Employee Costs: There is an underspend of £0.253m primarily due to vacancy management.
(1,263) 211           (17%) Income: There is an under-recovery of fee income of £0.211m which is primarily related to projects.
45             Other minor movements.
3
Note 9 Housing Assets and Investments
Movement: There has been a favourable movement of (£0.095m) since P10 mainly due to increased income offset by
increased employee costs. This is now reported as on budget.
(2,204) (86) 4% Income: Increased income from HRA.
(9) Other minor movements
(95)
Note 10 Property Maintenance
Movement: There has been an adverse movement of £0.139m since P10 mainly due to insurance works (£0.272m),
partially offset by a reduction in spend in relation to security costs and Rationalisation.
0 272 Administration Costs: An overspend of £0.272m in relation to insurance works.
8,071 (92) (1%) Property Costs: An underspend of £0.092m largely relating to lower than anticipated security costs and reduced
expenditure within the rationalisation budget.
(41) Other minor movements.
It is requested to earmark £0.500m to undertake programmes of Fire and Water Quality Risk Assessments and essential
works which arise from these assessments.
139
30

Page 31

Appendix 3a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 11 Property Running Costs
Movement: There has been a minor favourable movement of (£0.019m) since P10 due to a reduction in under-recovery of
income £0.101m, partially offset by increased overspends within property costs in relation to service charges and condition
surveys.
7,975 253 3%
Property Costs: Overspend of £0.100m due to Non Domestic Rates costs relating to the following properties: Moorpark
Primary which is scheduled for demolition, and Annickbank Innovation Campus which now has a lease agreed. The NDR
liability for Annickbank relates to the period it is unoccupied. There are also £0.058m of additional costs due to condition
surveys for the commercial estate and higher service charges of £0.072m.
(1,907) 376 (20%)
Income: Under-recovery of income £0.375m largely related to rental property income linked to market pressures, the
commercial property review is ongoing and we anticipate improvement in this position through recently agreed leases
which will fully come into effect in 2026/27 along with anticipated future pipeline of income from the capital investment
programme. 
5 Other minor movements.
634
Note 12 Internal Transport
Movement: There has been a favourable movement of (£0.310m) since P10, this is mainly due to an increased
underspend in Fuel of £0.076m, lower than projected costs for Software Licences of £0.026m, lower than projected Hires
costs of £0.019m, lower than projected overspend in Repairs and maintenance of £0.053m, an increase in Internal Pool
Vehicle Income of £0.042m and an increase in projected Bus Income of £0.060m.
1,714 (274) (16%)
Fuel: There is an underspend in fuel of £0.274m due to the current mix in fleet; HVO roll out, Electric Vehicles being
operated and fuel price volatility
5,513 (302) (5%)
Pupil Transport:  There is an underspend of £0.302m this was mainly due to changes from SPT as a result of expired
contracts with no renewal and savings on renewed contracts, linked to reduced levels of inflation, as well as in-house
operational efficiencies.
630 (61) (10%)
External Hires: There is a projected underspend in Roads Plant Hire of £0.103m due to works being allocated to capital. 
This is partially offset by an overspend of £0.061m mainly within Care at Home due to replacement vehicles to cover
extensive Vehicle Off Road time due to age of the current fleet and not having suitable zero emission alternatives readily
available. 
1,363 172 13%
Repairs & Maintenance: There is an overspend of £0.172m due to additional repairs being outsourced as a result of
difficulties recruiting Motor Mechanics (now resolved) during the first two quarters of the year along with maximising the life
of assets due to the availability of suitable replacements.  Automotive parts and third party labour cost continues to
increase.
(170) (241) 142%
Income: There is an over-recovery of £0.144m in bus transport income and an over-recovery of £0.121m in hire of pool
vehicle income which will support overspends in repairs and maintenance as end of life vehicles in pool are being retained
for longer, offset with a previously reported under recovery in Enterprise Cars Income.
(44) Other minor movements.
It is requested to earmark £0.274m in view of current global events to help address fuel cost pressures in 2026/27.
(750)
31

Page 32

Appendix 4
COMMUNITIES AND HOUSING
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Objective Summary
Annual
Budget
Projected 
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
Variance
Note
No
£000 £000 £000
Directorate and Support 262            249             (13)                (5%)
Housing and Public Protection
Building Services (2,565)        (2,622)         (57)                2% 1    
Works Scoping and Quality Assurance -                 -                  -                    0%
Property Governance -                 -                  -                    0%
Planning Services 257            112             (145)              (56%) 2    
Protective Services 2,167         2,008          (159)              (7%) 3    
Other Housing 2,790         2,501          (289)              (10%) 4    
Total for Housing and Public Protection 2,649         1,999          (650)             
Connected Communities 14,205       14,096        (109)              (1%) 5    
Net Total 17,116       16,344        (772)              (0)          
Transfer to/ (from) Earmarked Reserves 230            463             233              
Net Total 17,346       16,807        (539)             
Subjective Summary
Annual
Budget
Year End
Outturn
Annual
Variance
Adverse or
(Favourable)
%
variance
£000  £000  £000
Employee Costs 26,854       28,360        1,506            6%
Property Costs 4,603         5,129          526               11%
Supplies and Services 7,051         6,335          (716)              (10%)
Transport and Plant Costs 969            1,070          101               10%
Administration Costs 332            278             (54)                (16%)
Other Agencies & Bodies 12,527       12,531        4                   0%
Transfer Payments -                 -                  -                    0%
Other Expenditure 286            67               (219)              (77%)
Capital Financing -                 -                  -                    0%
Gross Expenditure 52,622       53,770        1,148            2%
Income (35,506)      (37,426)       (1,920)           5%
Net Expenditure 17,116       16,344        (772)              (5%)
32

Page 33

Appendix 4a
COMMUNITIES AND HOUSING
FINANCIAL PERFORMANCE 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 1 Building Services
Movement: There has been a favourable movement of £0.057m since Period 10.
10,792 (329) (3%)
Employees: an underspend in employee costs of £0.379m. This is due to vacancy management.
4,584 (570) (12%) Supplies & Services: an underspend in supplies and services of £0.570m. This is primarily as a result of an underspend in
materials due to changes in the income profile detailed below.
884 80 9% Transport: an overspend of £0.080m in transport costs primarily due to scaffolding costs linked to increased number of
factoring jobs received and some additional transport related costs.
3,287 184 6%
Third party payments: an overspend in third party payments of £0.184m. This is due to an overspend in payment to
contractors of £0.220m as a result of a carry forward of storm damage works from the previous financial year. This is partially
offset by an underspend of £0.036m in Agency costs.
(23,265) 614 -3%
Income: an under recovery in income of £0.614m. This is due to a reduction of £0.425m in voids works and £0.599m in
Projects, mainly due to a reduction in demand for replacement bathrooms and wetrooms at void stage as well as a reduction
in buybacks and the separation of communal windows from the window programme. There is also a reduction of £0.276m in
Aids & Adaptations. This is partially offset by an increase in Responsive Repairs income of £0.240m as a result of an
increase in storm damage works carried forward from last financial year partially offset by a reduction in other responsive
repairs and a 5% productivity efficiency. There is also an increase of £0.358m in Planned repairs due to increased timber and
damp works and an additional £0.096m in income mainly due to additional Estates Based Regeneration Programme fencing
works.
(36) Other minor movements
(57)
Note 2 Planning Services
Movement: There has been a favourable movement of (£0.031m) since Period 10, this is mainly due to underspend in Other
Supplies and Services of £0.043m.
100 (42) Supplies & Services: There is an underspend in Supplies & Services of £0.042m, mainly due to reprofiling of the  Local
Development Plan into 2026-27.
(684) (83) 12% Income: There is an over-recovery of £0.083m for additional planning fee application income.
(20) Other minor movements
It is requested to Earmark £0.043m of underspends which relate to the Local Development Plan
(145)
Note 3 Protective Services
Movement: There has been a favourable movement of (£0.043m) since P10, this is mainly due to a reduction in projected
emp costs of £0.094m due to ongoing service redesign, an increase in the over-recovery of Building Warrant income of
£0.155m and an over-recovery of income from HRA of £0.100m, offset with an overspend in Property costs of £0.314m due
to Forum fire
2,731 (189) (7%) Employee Costs:  There is an underspend of £0.180m, this is primarily due to a delayed implementation in the Scheme of
Delegation.
247 315 128% Property Costs:  There is an overspend of £0.314m, this is due to costs associated with making site safe following the Forum
fire of £0.300m and other minor variances
(1,233) (337) 27% Income: There is an over-recovery of £0.195m for additional Building Warrant income, an over-recovery of £0.100m in
income from HRA and other minor variances
52 Other minor movements
It is requested to Earmark £0.400m for further costs in relation to the demolition of the Forum Centre following the major fire
damage.
(159)
33

Page 34

Appendix 4a
Budget
£000
Projected
Variance
£000
Variance as
% of budget Section
Note 4 Other Housing
Movement: There has been a favourable movement of (£0.197m) since P10. This is mainly due to due to lower than
anticipated bad debt provision and write off costs.
3,524 (169) (5%) Employee Costs: There is an underspend of £0.169m due to vacancy management.
3,350 111 3%
Property Costs: An overspend of £0.166m mainly due to additional maintenance costs to be addressed at the void stage in
relation to homeless furnished units, partially offset by undersend in property repair costs of £0.027m and small variances
across other property costs.
55 (40) (73%) Administration Costs: Underspend due to lower staff training costs of £0.018m and legal expenses of £0.018m.
286 (220) (77%) Other Expenditure: underspend of £0.220m due to lower than anticipated bad debt provision and write off costs.
(7,016) 61 (1%) Income: There is an under-recovery mainly due to temporary furnished accomodation and hostel rents.
(32) Other minor movements
(289)
Note 5 Connected Communities
Movement: There has been favourable movement of (£0.261m) since P10.  This is due to a favourable movement of
£0.119m in property costs following less than anticipated costs in relation to Storm Eowyn and service management of
budget lines to offset the impact of revised programming of implementation of the libraries 20% reduction efficiencies target.
7,508 (5) (0%)
Employee Costs: There is a projected overspend of £0.098m related to the revised programming of implementation of the
approved saving for the libraries 20% reduction efficiencies target with work ongoing as part of the Land and Property review.
This is offset by management of other lines to reduce the impact, including an underspend of £0.103m across the service
primarily due to vacancy management.
767 66 9% Property Costs: An overspend of £0.106m due to storm damage repairs at Eglinton Country Park offset against an
underspend of £0.045m in library fixtures and fittings.
890 (70) (8%) Supplies and Services: There was an underspend of £0.070m primarily due to reduced spend within libraries.
(2,205) (95) 4% Income: There was an over recovery of Harbour Arts Centre income of £0.049m and Arran Outdoor income of £0.044m.
(5) Other minor movements.
It is requested that we earmark the Holiday Playschemes and Activites budget of £0.020m as part of delivery of a programme
of activities in summer 2026.
(109)
34

Page 35

Appendix 5
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 12 MONTHS TO 31 MARCH 2026
Objective Summary Annual Budget Final Outturn
Annual
Variance
Adverse or
(Favourable) % Variance Note No
£000 £000 £000
Strathclyde Passenger Transport 2,261 2,254 (7) 0%
SPT Concessionary Fares 291 291 - 0%
Ayrshire Joint Valuation Board 1,002 1,002 - 0%
3,554 3,547 (7) 0% 1               
Other Corporate Costs
Pension Costs 2,157 2,157 - 0%
Central Telephones 133 133 - 0%
Other Corporate Items (incl Transformation Costs, Bad
Debt Provision, External Audit fees and other centrally
held funding.)
7,509 1,024 (6,485)              -86% 2               
Insurance Account -1033 73 1,106               -107% 3               
Housing Benefit 3,651 3,847 196 5% 4               
-
Net Total 15,971 10,781 (5,190)              (32%)
Transfer to/ (from) Earmarked Reserves 139 3,496 3,357              
Net Total 16,110 14,277 (1,833) (11%)
35

Page 36

Appendix 5a
OTHER CORPORATE ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE 12 MONTHS TO 31 MARCH 2026
Budget
£000
Outturn
Variance
£000
Variance as
% of budget Section
Note 1 Joint Boards
No signficant movements since P10
3,554             (7) 0% Projected underspend of (£0.008m) due tp confirmation of annual requisitions and applicable refunds.
(7)                 
Note 2 Other Corporate Items
There has been an favourable movement of £6.485m since P10 primarily related to centrally held inflationary and othe budget
pressures not required in year.
7,268             (6,244)          (86%) An underspend of £6.485m in relation to centrally held inflationary and other budget pressures not required to be drawndown in
year.
(6,244)
Note 3 Insurance
There has been an adverse movement of £1.106m since P10 as a result of year end allocations of Insurance premiums and Excesses
(1,033)            1,106           -107% An overspend on insurance reflecting high level of excesses largely relating to recent storm damages.
1,106          
Note 4 Housing benefit
There has been a favourable movement of (£0.094m) since Period 10 in relation to the year end Housing Benefit submission to the
DWP.
3,651 196               5% Overspend of £0.040m due to the provision of Housing Benefits, reduced Bad Debt Provisions and additional overpayment recovery
196
36

Page 37

Appendix 6
MISCELLANEOUS ITEMS
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS TO 31 MARCH 2026
Objective Summary
Annual
Budget
Projected
Outturn
Annual
Variance
Adverse or
(Favourable) % variance Note No
£000 £000 £000
Financing Charges 13,751 13,751 - -
Contribution to Loans Fund Reserve 10,187 10,187 - -
Scottish Government Funding (394,613) (394,637) (24) 0%
Council Tax (71,939) (72,984) (1,045) 1% 1
Use of Earmarked Funds (8,766) (8,766) - -
Net Total (451,380) (452,449) (1,069) 0%
Transfer toEarmarked Reserves 1,500 1,500                   2
Net Total (451,380) (450,949) 431 (0%)
Note 2 Transfer to Earmarked Reserves
In view of the current conflict in the middle east and the anticipated inflationary impacts, the Bank of England
forecast for interest rates now reflects an increase from the current base rate of 3.75% up to potentially 5.25%
during 2026/27. In order to address the impact this will have on borrowing costs through 2026/27, it is requested
that £1.500m is earmarked and transferred to the Loans Fund reserve. 
The projected over recovery reflects growth in the Council Tax base from additional new builds, properties
previously registered as self-catering holiday units for NDR purposes that have come onto the Council tax register,
and the impact of the application of 100% premium on Council tax for second homes which has exceeded original
financial planning assumptions.
Note 1 Council Tax
There has been a favourable movement of £1.045m since P10 due to updated Council tax projections.
37

Page 38

Appendix 7
HOUSING REVENUE ACCOUNT
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget P12 outturn
Year End
variance
%
Variance Note No
£  £  £
Employee Costs 5,294 5,294 0 0%
Property Costs
Responsive Repairs 7,406 6,714 (692) (9%)
Void Repairs 4,656 4,348 (309) (7%)
Planned and Cyclical Maintenance 6,047 6,197 150 2%
Aids and Adaptions 1,792 1,342 (450) (25%)
Other property costs 5,726 5,935 209 4%
Total for Property Costs 25,627 24,536 (1,092) (4%) 1
Supplies & Services 2,145 2,130 (15) (1%)
Transport Costs 16 15 (1) (6%)
Administration Costs 2,114 1,902 (211) (10%) 2
Third Party Payments 3,832 3,771 (61) (2%) 3
Transfer Payments 177 124 (53) (30%) 4
Other Expenditure 550 948 398 72% 5
Capital Financing Costs 26,270 23,834 (2,437) (9%) 6
Gross Expenditure 66,026 62,555 (3,472) (5%)
Income
Council House Rents (62,592) (62,740) (147) 0%
Other Rents (541) (358) 183 (34%)
Recharges (1,212) (1,505) (292) 24%
Other Income (959) (1,174) (214) 22%
Transfer from HRA Balances (722) (722) 0 0%
Total Income (66,026) (66,497) (470) 1% 7
Net Expenditure (0) (3,942)           (3,942)          
38

Page 39

Appendix 7a
HRA
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
Budget
£000
Variance
£000 Variance as % of budget
Note 1
25,627 (1,092) -4%
(1,092)
Note 2
2,114 (211) -10%
(211)
Note 3
3,832 (61) -2%
(61)
Note 4
177 (53) -30%
(53)
Note 5
550 398 72%
398
Note 6
26,270 (2,437) -9%
(2,437)
Note 7
(66,026) (470) 0.7%
(470)
An over-recovery in income of £0.469m due to an over-recovery of £0.147m in Council House Rents, £0.292m in
Recharges primarily due to insurance recoveries and £0.214m in other income in relation to additional grants. This is
partially offset by an under-recovery of £0.184m in Other Rents as result of rent refunds and ex tenant arrears.
Income
Movement: There has been a favourable movement of £0.306m since Period 10.
Capital Financing Costs
Movement: there has been a favourable movement of £0.065m since Period 10.
An underspend of £2.437m in capital financing costs which reflects a continuing strategy to delay new external borrowing
by utilising cash balances, resulting in savings on external interest costs, changes in the profile of the capital programme
and projected investment income returns.
An underspend of £0.053m in Transfer payments due to a lower volume of disturbance allowances than anticipated when
the budget was set.
Other Expenditure
Movement: there has been an adverse movement of £0.398m since Period 10.
An overspend of £0.398m in Other Expenditure due to a review of the level/ methodology for calculation of the bad debt
provision.
Movement: there has been a favourable movement of £0.122m since Period 10.
An underspend of £0.061m in Third party payments due to an underspend in internal recharges.
Transfer Payments
Movement: there has been a favourable movement of £0.053m since Period 10.
Administration costs
Movement: there has been a favourable movement of £0.207m since Period 10.
An underspend of £0.211m in Administration costs. This is primarily due to lower than anticipated expenditure on external
legal fees (£0.103m), central recharges (£0.053m) and insurances (£0.025m).
Third Party Payments
Section
Property Costs
Movement: there has been a favourable movement of £1.250m since period 10. This is due to favourable movements of
£0.191m in Aids and Adaptations, £0.024m in Responsive Repairs, £0.276m in Void Repairs, £0.466m in Planned and
Cyclical Maintenance, and £0.293 in Other Property costs
An underspend of £1.092m in Property costs. This is due to an underspend of £0.692m in Responsive Repairs, primarily
as a result of an underspend of £0.162m in Emergency Repairs, £0.436m in Planned Repairs and £0.177m in RTR, an
underspend in Void Repairs of £0.309m and £0.450m in Aids & Adaptations. An element of the Voids and Aids and
Adaptations underspends, in particular, are attributable to the ongoing Housing Transformation Programme. These
underspends are partially offset by an overspend of £0.150m in Planned and Cyclical Maintenance and £0.209m in other
Property costs due to void rent loss.
39

Page 40

Appendix 7a
HRA
BUDGETARY CONTROL 2025/26
REPORT FOR THE TWELVE MONTHS ENDED 31 MARCH 2026
B/fwd from
2024/25
Transfer to /
from
Reserves
Use of
Earmarked
Sums
Earmarking of in
year surplus
Funding of
Capital Projects Reallocation
Balance at
31/03/26
£m £m £m £m £m £m
13.213 3.942 (0.227) 16.928
5.000 (0.495) 4.505
2.000 (0.213) 1.787
Unearmarked 1.758 0.170 1.928
0.170 (0.170) -
22.141 - - 3.729 (0.722) - 25.148
Housing Services Transformation Programme
Tenant led budget
Council House Building Fund
Sustainability Fund
HRA reserves and balances
40

Page 41

Appendix 8
Place
Employability - Employee Costs T 0.405
Employability - Income T 0.245
Employability - Transport Costs T 0.004
Employability - Third Party Payments T -0.612
Employability - Supplies and Services T -0.022
Employability - Admin Costs T -0.020
Roads - Employee Costs T -0.027
Roads - Supplies & Services T -0.073
Roads - Third Party Payments T 0.376
Roads - Income T -0.276
0.000
Perm (P) /
Temp(T)
Virement £m
Directorate
Total £m
Budget Management - 31 March 2026
Virement/Budget Adjustment Requests
2025/26
41

Page 42

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Cabinet
2 June 2026
At a Meeting of the Cabinet of North Ayrshire Council at 2.30 p.m. involving a
combination of participation by remote electronic means and physical attendance within
the Council Chambers, Irvine
Present (Physical Participation)
Tony Gurney, Christina Larsen, Eleanor Collier, Alan Hill, Margaret Johnson, and for
consideration of Education Authority Business Elizabeth Turbet and Jacqui MacKenzie.
Present (Remote Participation)
Chloé Robertson.
In Attendance
C. Hatton, Chief Executive; S. Anson, Executive Director, A. McClelland, Head of
Service and L. Kayes, Policy Officer (Child Poverty); R. McCutcheon, Executive
Director, L. Cree, Head of Service (Sustainability, Transport and Corporate Property), L.
Kirk, Director (Regional Economy), D. McDowall, Head of Service (Ayrshire Growth
Deal) and S. Baird, Senior Officer (Islands) (Place); D. Hammond, Executive Director, Y.
Baulk, Head of Service (Housing and Public Protection), F. Ellis, Senior Manager
(Housing Strategy & Development), L. Forsyth, Senior Manager (Information and
Culture), J. Greenlees, Senior Manager (Connected Communities) and S. McKenzie,
Senior Manager (Protective Services) (Communities and Housing); C. Cameron,
Director (Health and Social Care Partnership); M. Boyd, Head of Service (Finance); F.
Walker, Head of Service (People & ICT); R. Lynch, Senior Manager (Legal Services), J.
Hutcheson, Senior Communications Officer (Media and Internal Communications) and
C. Stewart, Committee Services Officer (Democratic Services) (Corporate Services).
Chair
Tony Gurney in the Chair.
1. Declarations of Interest
There were no declarations of interest by Members in terms of Standing Order 11 and
Section 5 of the Code of Conduct for Councillors.
2. Minutes
The Minutes of the Meeting of the Cabinet held on 28 April 2026 were confirmed and
the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973.
3. Planned temporary closure of educational provisions
Submitted a report by the Executive Director (Education) outlining a standardised
procedure in connection with the planned temporary closure of educational provisions,
compliant with updated Scottish Government Guidance, attached at Appendix 1 to the
report.
42

Page 43

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Officers responded to Members’ questions and the Cabinet agreed (a) to note the
decisions taken, which resulted in the temporary closure of two early years’ classes for
session 2026-27; (b) to approve the adoption of the proposed policy for future
temporary closures, in line with updated Scottish Government Guidance subject to the
addition of “trade unions” in Section 3.2 of the policy and (c) to the submission of an
annual report to Cabinet summarising any proposed temporary closures for future
sessions.
4. Review of ELC Sustainable Rates for Funded Providers
Submitted a report by the Executive Director (Education) seeking approval from Cabinet
to increase the sustainable rate of payment to funded providers of early learning and
childcare (ELC) in North Ayrshire who are contracted by the Council to deliver funded
ELC to eligible 2-5-year-olds. 
Officers responded to Members’ questions and the Cabinet agreed (a) an increase of
6.2% in the current hourly rate paid by the Council to funded providers, backdated to 1
April 2026; (b) to an increase to all funded providers (including childminders) in the
amount paid per meal to £3.22, and for this to be backdated to 1 April 2026; and (c) to
receive a further report at the time of the next annual review of the sustainable rate for
funded providers.
5. School Leavers’ Attainment and Achievement 2025
Submitted a report by the Executive Director (Education) on the overall performance of
the 2024-25 cohort of North Ayrshire Council school leavers. The glossary of key terms
used in the report was attached at Appendix 1.
Officers responded to Members’ questions and the Cabinet agreed to (a) note the
content of the report, including the achievements of school leavers in qualifications in
2025; and (b) note the measures being taken to make further improvements to
attainment and achievement levels across NAC Secondary schools.
6. Care Experienced School Leavers’ Attainment and Achievement2024-25
Submitted a report by the Executive Director (Education) on the overall performance of
the 2024-25 cohort of care experienced school leavers in North Ayrshire. The glossary
of key terms used in the report was attached at Appendix 1.
Officers responded to Members’ questions and the Cabinet agreed (a) to note the
content of the report, including the achievements of care experienced school leavers in
qualifications in 2025; and (b) to note the continued focus on improving outcomes for
care experienced learners in North Ayrshire.
7. School Holiday Calendar – Academic Session 2027-28
Submitted a report by the Executive Director (Education) informing Cabinet of changes
to the school holiday calendar from academic session 2027-28, attached at Appendix 1
to the report. It was noted that there had been a correction, in the version of the
calendar that had been issued, and the revised calendar had been uploaded to the
Council’s website.
43

Page 44

OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Cabinet agreed (a) to note the significant level of engagement and consultation
with key stakeholders; and (b) to note the resultant agreed changes to the school
holiday calendar, to be implemented from session 2027-28 onwards.
8. Child Poverty Action Plan Progress Report 2025-26
Submitted a report by the Executive Director (Education) requesting approval of the
Child Poverty Action Plan Progress Report 2025-26, attached at Appendix 1 to the
report.
Officers responded to Members’ questions and the Cabinet agreed to publication of
the Child Poverty Action Plan Progress Report 2025-26 provided at Appendix 1 to the
report and its submission to the Scottish Government. 
9. Children’s Services Performance Report 2025/26
Submitted a report by the Director (HSCP) seeking approval for the North Ayrshire
Children’s Services Plan Performance Report 2025/26. The Children’s Services Plan
Action Update 2025-26 and the Children’s Services Plan Performance Indicators 2025-
26 were attached at Appendices 1 and 2, respectively, to the report.
The Cabinet agreed (a) to approve the North Ayrshire Children’s Services Plan
Performance Report 2024/26; and (b) to note the update in relation to the new Children
and Families Plan 2026-2029.
The following item is subject to the call-in procedure per the Council's Scheme of
Administration and will be considered at a Special meeting of Audit & Scrutiny
Committee.
10. Revenue Budget 2025/26: Financial Performance to 31 March 2026
Submitted a report by the Head of Finance advising Cabinet of the financial
performance for the Council for 2025/26.
Officers responded to Members’ questions and Councillor Larsen, seconded by
Councillor Gurney, moved as follows:
“That the Cabinet supports the recommendations set out in the report, subject to the
amendment below:
Approve subject to the movement of £1.496m of underspend to the 26/27 revenue
budget. These funds to be used to create an Our Places, Our Communities fund
designed to benefit all North Ayrshire communities. The administration will bring details
of this fund to council on the 24th of June for debate and approval.”
There being no amendment, the motion was declared carried.
Accordingly, the Cabinet agreed as follows:
44

Page 45

OFFICIAL INFORMATION
OFFICIAL INFORMATION
To (a) note (i) the information and financial outturn position outlined in the report; (ii) the
financial performance for the Health and Social Care Partnership highlighted at 2.5 of
the report; and (b) approve (i) the earmarking of £7.691m identified at 2.4 of the report
to meet future year commitments in accordance with funding requirements; and (ii) the
virements detailed in Appendix 8 to the report.
Approve subject to the movement of £1.496m of underspend to the 26/27 revenue
budget. These funds to be used to create an Our Places, Our Communities fund
designed to benefit all North Ayrshire communities. The administration will bring details
of this fund to council on the 24th of June for debate and approval.
11. Capital Programme Performance to 31 March 2026
Submitted a report by the Head of Finance advising Cabinet of progress in delivering
the Capital Investment Programme 2025/26.
Officers responded to Members’ questions and the Cabinet agreed (a) to approve the
virement proposal noted within the HRA programme detailed in Appendix 2 to the
report; (b) note (i) the revisions to budgets outlined in the report; (ii) the General
Services and HRA revised budgets at 31 March 2026; and (iii) the net expenditure to 31
March 2026.
12. Community Asset Transfer – Blacklands Hall, Kilwinning
Submitted a report by the Executive Director (Communities and Housing) seeking
approval for the transfer of ownership of Blacklands Hall (and adjacent land), Abbots
Avenue, Kilwinning to the Kilwinning Community Shed. The location plan was attached
at Appendix 1 to the report.
Officers responded to Members’ questions and Cabinet agreed (a) to the asset transfer
of Blacklands Hall and the adjacent land from North Ayrshire Council to the Kilwinning
Community Shed; (b) to approve the recommended terms of transfer on this occasion at
5% of the property valuation of £85,000 (totalling £4,250); and (c) to authorise officers to
conclude the associated legal and community asset transfer processes for Blacklands
Hall and adjacent land.
13. Community Asset Transfer – Auld Dirrans Resource Centre, Kilwinning
Submitted a report by the Executive Director (Communities and Housing) seeking
approval for the transfer of ownership of Auld Dirrans Resource Centre, 70 Dirrans
Terrace, Kilwinning to Irvine Elite Boxing Club. It was noted that a revised copy of the
location plan, attached at Appendix 1 to the report, had been uploaded to the Council’s
website showing the correct location.
Officers responded to Members’ questions and Cabinet agreed (a) to the asset transfer
of Auld Dirrans Resource Centre from North Ayrshire Council to Irvine Elite Boxing Club;
(b) to approve the recommended terms of transfer on this occasion at 5% of the
property valuation of £85,000 (totalling £4,250); and (c) to authorise officers to conclude
the associated legal and community asset transfer processes for Auld Dirrans Resource
Centre.
45

Page 46

OFFICIAL INFORMATION
OFFICIAL INFORMATION
14. Proposals for Community Investment Fund (CIF) Expenditure
Submitted a report by the Executive Director (Communities and Housing) to determine
applications by Locality Partnerships to allocate CIF funding to proposed projects. The
application from Dalry Community Sports Club was attached at Appendix 1 to the report.
Officers responded to Members’ questions and the Cabinet (a) reviewed the application
from Garnock Valley Locality Partnership in line with CIF criteria; and (b) agreed to
approve the CIF application in relation to Dalry Community Sports Club (Appendix 1 to
the report).
15. Use of Animals at Public Events
Submitted a report by the Executive Director (Communities and Housing) seeking
Cabinet approval of Guidelines and Policy relating to the use of animals at public
events, attached at Appendix 1 to the report.
The Cabinet agreed to approve the Guidelines and Policy relating to the use of animals
at public events detailed in Appendix 1 to the report.
The following item is subject to the call-in procedure per the Council's Scheme of
Administration and will be considered at a Special meeting of Audit & Scrutiny
Committee.
16. North Ayrshire Housing Acquisition Strategy
Submitted a report by the Executive Director (Communities and Housing) seeking
Cabinet approval of the proposed Housing Acquisition Strategy 2026-2031, attached at
Appendix 1 to the report.
Officers responded to Members’ questions and Cabinet agreed to approve the proposed
North Ayrshire Housing Acquisition Strategy detailed in Appendix 1 to the report.
The following item is subject to the call-in procedure per the Council's Scheme of
Administration and will be considered at a Special meeting of Audit & Scrutiny
Committee.
17. Ardrossan Campus - Project Update
Submitted a report by the Executive Director (Place) providing Cabinet with an update
on the current progress of the Ardrossan Campus project, including current projections
in relation to costs and programme.
Officers responded to Members’ questions and Cabinet agreed (a) to note the content of
this report, including the current progress of work on site; (b) to note the revised project
completion date of 26 May 2028, with anticipated occupation from August 2028; and (c)
to note the additional estimated cost of £9.97 million (8.74%) associated with
addressing the contamination will be met from approved capital flexibility funding.
46

Page 47

OFFICIAL INFORMATION
OFFICIAL INFORMATION
18. Ayrshire Growth Deal: International Marine Science and Environment
Progress (IMSE) Update
Submitted a report by the Executive Director (Place) on progress on the International
Marine Science and Environment project and seeking approval for the strategic direction
and to note the development of a Collaboration Agreement with partners Field Studies
Council and Community of Arran Seabed Trust to support the further development of
the project.
The Cabinet agreed to (a) note the progress to date and approves the strategic direction
for the International Marine Science and Environment project; (b) notes the
development of a Collaboration Agreement with the Field Studies Council and the
Community of Arran Seabed Trust to progress the project and develop the full business
case; and (c) notes the progression of the change management requirements and
Outline Business Case for the project, informed by feedback from the Scottish and UK
Governments.
19. Flexible Advanced Manufacturing Space, i3 Irvine: Phase 2, Full Business
Case
Submitted a report by the Executive Director (Place) seeking endorsement of the Full
Business Case for Phase 2 of the Flexible Advanced Manufacturing Space Project at i3,
Irvine, attached at Appendix 1 to the report.
The Cabinet agreed (a) to endorse the Full Business Case for Phase 2 of the Flexible
Advanced Manufacturing Space project at i3, Irvine, subject to feedback from Scottish
and UK Governments and the successful outcome of the tender process; (b) that
authority be delegated to the Executive Director (Place) to update the Full Business
Case to reflect the feedback and outcome of the tender process; and (c) to approve the
submission of the Full Business Case to the Ayrshire Economic Joint Committee. 
20. National Islands Plan and North Ayrshire Islands Programme Update
Submitted a report by the Executive Director (Place) on the North Ayrshire Islands
Programme and the new National Islands Plan and outlining proposed next steps. The
North Ayrshire Islands Programme Achievements 2022 to 2025 was attached at
Appendix 1 to the report.
Officers responded to Members’ questions and Cabinet agreed (a) to note (i) the
progress of the North Ayrshire Islands Programme and achievements to date, (ii) the 
publication of the National Islands Plan 2026 to 2031 and associated investment in
2026/27; (b) to the refresh and refinement of the current Local Island Plans and
associated delivery plans and their intended reporting; and (c) to the finalisation and
submission of the proposed funding applications to the Scottish Government’s Islands
Programme.
47

Page 48

OFFICIAL INFORMATION
OFFICIAL INFORMATION
21. Regeneration Delivery Plan Funding Proposals Update 2026/27
Submit a report by the Executive Director (Place) on progress of the Regeneration
Delivery Plan and seeking approval for proposed funding allocations in 2026/27. The
Regeneration Funding Proposals and the Project Updates were set out in Appendices 1
and 2, respectively, to the report.
The Cabinet agreed (a) to approve (i) the Regeneration funding proposals as detailed at
Appendix 1 to the report; and (ii) the proposed delegated authority changes following
service restructure; (b) to note (i) the progress made on the implementation of the
Regeneration Delivery Plan; and (ii) the update on previously secured or applied for
funds provided at Appendix 2 to the report; and (c) that delegated authority be granted
to the Executive Director (Housing and Communities) to agree changes to the funding
allocations in Appendices 1 and 2 in the report, in consultation with the Portfolio Lead as
required.
22. Fleet Decarbonisation
Submitted a report by the Executive Director (Place) on progress made to date with
decarbonisation of the Council Fleet and providing details of the further proposed
decarbonisation-first approach work going forward.
Officers responded to Members’ questions and Cabinet agreed (a) the decarbonisation-
first approach for fleet replacement outlined at paragraph 2.17 of the report; (b) note (i)
the progress made to date in decarbonising the fleet, and against the actions set out in
the May 2023 Cabinet paper, and (ii) that the Council’s current fleet decarbonisation
actions would continue to evolve to reflect the Scottish Government’s refreshed Climate
Change Plan 2026-2040 and the awaited public sector fleet decarbonisation action plan.
23. Urgent Items
There were no urgent items.
The meeting ended at 4.45 p.m.
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home
48

Page 49

Revenue Budget 2025/26: Financial Performance to 31 March 2026
Briefing Note:-
Mark Boyd (Head of Service – Finance)
The Revenue Budget report to the 31 March 2026 was presented at Cabinet on 2 June
2026 and outlined the final reported position for the 2025/26 financial year. This position
will be reflected in the Council’s Unaudited accounts due for presentation at Council on
the 24 June 2026.
The General Fund reported a net in-year underspend of £2.014m for the year. This is the
net position after transferring resources to and from earmarked reserves. This is an
improvement of £0.334m from that reported at period 10. This underspend will be
added to the General Fund Unearmarked reserves which would increase the available
balance to 2.3% of the General Services Revenue Budget which is within the
recommended range of 2% to 4%. The level of General Fund Unearmarked Reserves at
31 March 2026 is £11.195m. This is £1.496m above the 2% lowest Reserves threshold of
£9.699m. Whilst the current level of Unearmarked Reserves remains at the lower end of
good practice, this still reflects a prudent position to help address areas of significant
risk to the Council through 2026/27, most notably through the financial performance of
the HSCP, this being set within the context of the savings the HSCP require to deliver to
remain within available resources during 2026/27.
The report also references the improved position of the Health and Social Care
Partnership (HSCP) for the year 2025/26 i.e. the final outturn for the Council Services
element of the HSCP is a net underspend of £0.459m after earmarking resources. This
is an improvement of £1.941m from that reported at period 10. The £0.459m will be
added to the HSCP’s Unearmarked Reserves. This will help address pressures through
2026/27, however, as referenced above the HSCP requires to make significant savings
through 2026/27.
An Amendment was made to this report as follows:-
That the Cabinet supports the recommendations set out in the report, subject to the
amendment below:-
“Approve subject to the movement of £1.496m of underspend to the 26/27 revenue
budget. These funds to be used to create an Our Places, Our Communities fund
designed to benefit all North Ayrshire communities. The administration will bring details
of this fund to council on the 24th of June for debate and approval.”
The financial effect of this Amendment is to utilise, in 2026/27, the level of
Unearmarked reserves, being the difference between 2.3% reserves and 2%
Unearmarked reserves for the stated purpose. Whilst this is still within the Council’s
reserves policy, it is at the lowest end. Further, as the utilisation of reserves relates to
Appendix 2
49

Page 50

2026/27, this does not change the Council’s reported out-turn or reserves position at 31
March 2026, therefore the Council’s unaudited Accounts are unaffected and will be
submitted to Council for approval on 24 June 2026 as planned.   
50

Page 51

NORTH AYRSHIRE COUNCIL 
15 June 2026 
Audit and Scrutiny Committee 
Title:    Call In: North Ayrshire Housing Acquisition Strategy 
Purpose:  To allow the Committee to consider a call-in request in respect
of the decision taken by Cabinet at its meeting on Tuesday 2
June 2026 on the proposed Housing Acquisition Strategy 2026-
2031. 
Recommendation:  That the Committee considers the terms of the call-in and agrees,
or otherwise, to make a recommendation to Cabinet. 
1. Executive Summary 
1.1    In terms of the Scheme of Administration (Section 5), the Audit and Scrutiny Committee
has a remit to consider call-in requests and invite at least one of the Members who has
requested the reference to call-in to attend the Committee to explain the request. 
1.2 This report sets out the background to a call-in request in respect of the decision
taken by Cabinet at its meeting on 2 June 2026 in relation to the report on the
proposed Housing Acquisition Strategy 2026-2031. 
2. Background 
2.1 The Cabinet, at its meeting on 2 June 2026, considered a report on the proposed
Housing Acquisition Strategy 2026-2031. 
2.2 A request was received in terms of the call-in procedure set out in the Council's
Scheme of Administration and Standing Orders, that the Audit and Scrutiny
Committee examine the decision taken by the Cabinet. 
2.3 The call-in request, which was signed by Councillors Cullinane, Foster and
Montgomerie is in the following terms: - 
Reason for call-in 
“It is wrong to suggest this policy will have no impact on the Council’s Community
Wealth Building (CWB) strategy. A key component of the strategy is to increase
procurement spend with North Ayrshire, and Ayrshire, businesses creating
economic and socio benefits from investing in the local economy. The fact that
Ayrshire based companies have won our council house building contracts has
made a significant contribution to us achieving the initial procurement targets set
Agenda Item 3
51

Page 52

out in the first CWB strategy published in 2020. 
This policy is the opposite of this approach. It will see a significant proportion of
our investment in Council housing, the majority of which comes from the Council
with the rest from Holyrood, be transferred to private housing developers, many
of which are large national developers. It will see that investment extracted from
the Ayrshire economy. 
We remain as committed to Community Wealth Building as were in 2020. We
therefore reject this policy.” 
Desired Outcome 
“That the Council reaffirms its commitment to Community Wealth Building by
rejecting this policy and redoubling our efforts to ensure that Ayrshire based
companies can bid for, and win, the contracts to build the next generation of
Council houses in North Ayrshire.” 
2.4 A copy of the original report presented to Cabinet on 2 June 2026 is attached as
Appendix 1 to this report.  A briefing note has been provided by the Executive Director
(Communities and Housing) and is attached at Appendix 2. 
2.5 The call-in request is valid for consideration by the Committee. The request was
received within the appropriate timescale, it was requested by three Elected Members
and details were provided on both the reason for the call-in and the desired outcome. 
2.6 The Elected Members who have submitted the call-in will be invited to address the
Committee to explain the respective call-in request.  The appropriate Cabinet Member
will then be invited to clarify the reasons for the decision. The relevant senior officer
will also be present to provide information on the report presented to Cabinet and on
issues raised by the call-in received. The Committee will have an opportunity to ask
questions of both parties and of those officers in attendance. 
2.7 The Committee will then debate the call-in request and decide whether or not it agrees
with the decision of the Cabinet. 
2.8    The Audit and Scrutiny Committee:- 
i) decides if it agrees or not with the decision of the Cabinet; and
ii) if it does not agree with the decision, considers what alternative action the
Committee would recommend to the Cabinet. 
2.9   If the Committee supports the decision of Cabinet and does not accept the call-in, the
original decision of Cabinet remains in effect, and no further procedure is required. 
2.10 If the Committee accepts the call-in, the matter is referred to Cabinet with a
recommendation. When the matter is considered by the Cabinet, the Chairperson or
another member of the Audit and Scrutiny Committee will have the right to attend the
Cabinet and speak in support of any recommendation. 
52

Page 53

2.11 In the event that Cabinet declines to accept the recommendation from the Audit and
Scrutiny Committee, the matter will be referred to Council for determination. The
decision of the Council will be final.
3. Proposals
3.1 It is proposed that the Committee considers the call-in request.
4. Implications/Socio-economic Duty
Financial
4.1 The financial implications are outlined in the North Ayrshire Housing Acquisition
Strategy report attached at Appendix 1.
Human Resources
4.2 The human resource implications are outlined in the North Ayrshire Housing
Acquisition Strategy report attached at Appendix 1.
Legal
4.3 The legal implications are outlined in the North Ayrshire Housing Acquisition Strategy
report attached at Appendix 1.
Equality/Socio-economic
4.4 The equality/social-economic implications are outlined in the North Ayrshire Housing
Acquisition Strategy report attached at Appendix 1.
Climate Change and Carbon
4.5 The climate change and carbon implications are outlined in the North Ayrshire
Housing Acquisition Strategy report attached at Appendix 1.
Key Priorities
4.6 The key priorities are outlined in the North Ayrshire Housing Acquisition Strategy
report attached at Appendix 1.
Community Wealth Building
4.7 This is the subject of the call-in.
Islands Communities Impact Assessment (ICIA)
4.8 Any ICIA implications are outlined in the North Ayrshire Housing Acquisition Strategy
report attached at Appendix 1.
53

Page 54

United Nations Rights of the Child (UNCRC) 
4.9 Any UNCRC implications are outlined in the North Ayrshire Housing Acquisition
Strategy report attached at Appendix 1. 
Consumer Duty 
4.10 Any consumer duty implications are outlined in the North Ayrshire Housing Acquisition
Strategy report attached at Appendix 1. 
5. Consultation 
5.1 None concerning this report. 
Craig Hatton
Chief Executive 
For further information please contact Shannon Wilson, Committee Services Officer, on
shannonwilson@north-ayrshire.gov.uk. 
Background Papers 
N/A
54

Page 55

NORTH AYRSHIRE COUNCIL
2 June 2026
Cabinet
Title: North Ayrshire Housing Acquisition Strategy
Purpose: To seek Cabinet’s approval of the proposed Housing
Acquisition Strategy 2026-2031.
Recommendation: It is proposed that Cabinet approves the proposed North
Ayrshire Housing Acquisition Strategy at Appendix 1.
1. Executive Summary
1.1  Housing to 2040 continues to be the Scottish Government’s overarching
strategy that sets out their vision and roadmap for ensuring everyone has a
safe, good quality and affordable home that meets their needs, in the place
they want to be, by 2040.
1.2  The Scottish Government declared a national housing emergency in May 2024.
In September 2025, the Scottish Government released their Housing
Emergency Action Plan which comprises new, enhanced, and accelerated
actions, reflecting their determination to go further and faster in their
commitment to tackling the housing emergency during the remainder of this
Parliament and beyond.
1.3  The proposed North Ayrshire Housing Acquisition Strategy will support the
Scottish Government’s objective of expanding the scale of acquisitions to
increase overall housing supply. 
1.4  The Strategic Housing Investment Plan (SHIP) 2026-2031 sets out the priorities
and locations for affordable housing investment by the Council and registered
social landlords in North Ayrshire over the five-year period, to support the
outcomes in the Local Housing Strategy.
1.5  The Strategic Housing Investment Plan 2026–2031 aims to secure investment
for the delivery of a total of 1,038 properties – 741 by the Council and 297 by its
RSL partners - providing sustainable, affordable, accessible, and high-quality
homes which will contribute to the wider regeneration aims for the area.
1.6  The North Ayrshire Local Housing Strategy 2023-2028 was approved by
Cabinet on 13 June 2023 and sets out the strategic ambition for Housing in
North Ayrshire: “we want all our people to live in the right homes, in great
places, with access to any support services they need”. Four overarching
outcomes were developed to achieve this ambition, which align to our Council
Appendix 1
55

Page 56

Plan and the four key strategies in the Scottish Government’s ‘Housing to 2040’
vision. 
1.7  The proposed North Ayrshire Housing Acquisition Strategy will support the
following LHS actions: 
• Deliver 1,666 new units of social housing
• Consider opportunities to provide homes in and around our town centres 
• Support the Scottish Government's target to deliver 110,000 new affordable
homes by 2032 by delivering the projects set out within the Strategic
Housing Investment Plan
• Increase the social housing supply by buying back former social housing 
• Bring empty homes back into use through the buyback scheme
• Ensure that the Strategic Housing Investment Plan addresses current and
future demographic needs. 
1.8  The Housing Acquisition Strategy will contribute to the SHIP, helping to achieve
the Council Plan priorities and strategic aims by: 
• Through our housebuilding programme and wider housing investment,
providing homes for life that meet the needs of our residents
• Increasing the number of homes in the area through a mix of private and
social developments and bringing empty buildings back into use 
• Ensuring our places and spaces where we live, work and visit are well
maintained and accessible
• Reducing the carbon footprint of our estate through rationalisation utilising
a locality-based approach and taking a fabric first and low carbon energy
generation approach to homes and buildings 
2. Background 
2.1  It is recognised that purchasing ex-local authority stock is an effective way to
increase social housing stock and provide value for money for the investment
made, and the SHIP 2025-2030 increased the Council’s buyback scheme to 60
properties by 31 March 2030. The Council’s developing Registered Social
Landlord partners have also included buyback programmes within the SHIP,
aiming to acquire a further 29 new homes. 
2.2  Five former social housing properties were purchased by the Council in
2023/24 to increase the affordable housing supply through the SHIP 2024-2029
buyback scheme, achieving our target of purchasing five properties during that
year. 33 properties were also acquired for Ukrainian Displaced Persons in the
last quarter of 2023/24, which were fully funded by the Scottish Government.
The Council and its partners acquired three buybacks utilising SHIP funding
during 2024/25; the Council purchased two homes for the Council’s buyback
programme and Cairn, in partnership with ANCHO, bought back one home.
Trust Housing Association also acquired two homes on Arran in 2024/25 and
three in 2025/26 utilising the Scottish Government’s Rural Affordable Homes for
56

Page 57

Key Workers Fund, and they are actively pursuing another six on the island at
the start of 2026/27. 
2.3  The revised North Ayrshire’s Resource Planning Assumption for 2025/26 was
£16.125m. During March 2026, the Scottish Government provided Resource
Planning Assumption figures for the next four years to 2029-2030 as follows: 
• £16.889m for 2026/27
• £17.396m for 2027/28 
• £17.918m for 2028/29 
• £18.455m for 2029/30 
£2.647m of the total RPA has been allocated for second hand and empty home
acquisitions over the five years to 2031. 
2.4  The Affordable Housing Supply Programme can support the following types of
purchase where there is a strategic housing need, as identified and agreed by
the local authority: 
• Open market purchases with vacant possession
• Off-market purchases with vacant possession
• Purchases where an owner occupier cannot afford the required
maintenance or refurbishment of their home and wishes to sell and remain
in the home as a tenant in the social rented sector
• ‘Off the shelf’ purchases from developers
• Properties from landlords leaving the private rented sector with a tenant in
situ, where this meets a clear strategic purpose and where the tenant is at
risk of homelessness 
2.5  Private housing (owned by individuals or private landlords) forms 73% of all
homes in the area, with the remaining 27% being owned and rented by North
Ayrshire Council and local Registered Social Landlords (RSLs). The cost of
buying a home in North Ayrshire is significantly lower than the national average. 
2.6  As at April 2026, there were currently 6,155 applicants on the North Ayrshire
Housing Register, with 3,401 assessed as having a housing need. 
2.7  The current pace of the second-hand property market means that it has proven
difficult to acquire homes from the private market to meet our buyback scheme
as set out in the SHIP. To address this challenge, we identified the need to
develop an acquisition strategy and review our internal procedures. 
2.8  The Scottish Government supports acquisitions to bring existing homes into
use more quickly, increase affordable supply, and make efficient use of public
investment. 
2.9  The North Ayrshire Acquisition Strategy has been developed to ensure that the
Council continues to meet affordable housing need and demand across North
Ayrshire by increasing the availability of permanent social rented homes, and to
57

Page 58

ensure funding is maximised and value for money is demonstrated across
various 
funding streams. The new strategy has identified the opportunity to consider
“Off the-shelf” acquisitions which can be a strategic tool to rapidly increase the
supply of social homes and meet urgent local housing needs, including
reducing the use of costly temporary accommodation, and can offer value for
money compared to other housing delivery options. 
2.10  To be considered for acquisition, properties must support one or more of the
objectives of the strategy and must meet one or more of the criteria of the
strategy. 
2.11 Objectives 
• Help achieve the strategic outcomes set out in the Local Housing Strategy:
• More homes at the heart of great places
• Affordability & choice
• Affordable warmth & zero emissions
• Improving the quality of our homes
• Meet demand in the highest need areas, as identified through the Housing
Needs and Demand Assessment (HNDA) and ongoing demand analysis. 
• Assist in delivering the Strategic Housing Investment Plan, which sets out
the affordable housing investment priorities within North Ayrshire 
• Utilise opportunities to acquire properties on the open market or through
speculative approaches from owners, where this supports strategic housing
need
• Increase the number of long-term empty properties brought back into use,
through effective collaboration with the Council’s Private Sector Housing
Advice Team.
• Continue to assess any opportunities for acquisition that arise in suitable
housing supply influenced through the impact of the application of the
100% premium in Council tax for second homes, across the mainland and
both island communities.
• Enhance block sustainability and support future maintenance by increasing
Council ownership in partially factored blocks through proactive
engagement with private owners.
• Support the reduction of homelessness by ensuring, where appropriate,
that acquired properties contribute to meeting the housing needs of
households in temporary accommodation. 
2.12 Criteria 
A property must meet specific requirements to demonstrate best value for
money and alignment to the need and demand in North Ayrshire. Therefore, to
be considered by North Ayrshire Council for acquisition, properties will form
part of the overall social rented stock once purchased and must - in addition to
being of a property type or size with an evidenced need or demand - meet one
or more of the criteria below, in addition to any other criteria specified:
58

Page 59

• Ex-local authority stock, within North Ayrshire Council estates, which will
facilitate effective and efficient housing management
• Located in an area identified as having an affordable housing shortfall
• Long term empty properties, where the purchase would allow for greater
local amenity and contribute to the Council’s statutory duties and strategic
objectives
• ‘Off the shelf’ purchases from developers 
• Purchase will be less than the development costs of building a comparable
property. Properties which cost more than this will be considered on a
case-by-case basis, e.g., if the property is highly adapted and meets the
requirements of an applicant with an accessible housing need
• The purchase price is equal to, or a reduction of, the actual market value as
assessed by the Council’s valuation report/ home report valuation.
Properties which cost more than this will be considered on a case-by-case
basis, e.g., projects in regeneration areas; remote, rural or island areas; or
involving housing for people with particular/ specialist needs
• The property will be able to achieve and be maintained to a standard
acceptable to the Council, e.g. to the SHQS and EESSH2/ SHNZS
• Of standard construction only (due to the legal and cost implications they
could incur if otherwise). 
2.13 Any decision to acquire a property is at the discretion of North Ayrshire Council
and is subject to the availability of relevant funding. If purchased, properties will
be improved to meet the Scottish Housing Quality Standard (SHQS) and the
Energy Efficiency Standard for Social Housing (EESSH2)/ Social Housing Net
Zero Standard (SHNZS). 
2.14 Four acquisition workstreams are currently being utilised in North Ayrshire: 
• Strategic Housing Investment Plan (SHIP) 
• Affordable Housing Initiative for Key Workers 
• Estate Based Regeneration Programme 
• Void and Acquisition Fund 
2.15 SHIP: The SHIP 2026 to 2031 makes provision for empty and second home buy
backs, with the Council’s Private Sector Advice Team providing advice and
assistance on empty homes. As at 1 April 2026, there are 582 empty homes
subject to the Council Tax levy in North Ayrshire. Additionally, there are
approximately 1,500 second homes in North Ayrshire, the majority of which are
located on the islands of Arran and Cumbrae. 
2.16 Bringing former social housing stock into ownership can assist with housing
management, maintenance issues, and increase housing available through the
North Ayrshire Housing Register. Over the past four financial years the Council
has acquired four empty homes, using funding from the Affordable Housing
Supply Programme, which have been brought back into use as Council stock. 
59

Page 60

2.17 North Ayrshire Council may purchase properties for the use of specific applicant
needs where no suitable Council or RSL property exists and where the cost of
purchasing the property would be more cost effective than making adaptations
and alterations to existing stock. Properties should be purchased with vacant
possession however North Ayrshire Council may consider purchasing private
rented or owner-occupied properties where the tenancy or ownership is at risk,
and the property has been substantially adapted in a major, permanent way to
meet the needs of the tenant or household. The tenant or owner should have a
live North Ayrshire Housing Register application and there should be no
suitable Council or RSL property which meets the needs of the applicant
(including consideration of the costs of adapting existing stock). 
2.18 ‘Off-the-shelf’ property acquisitions have been included in the Acquisition
Strategy to allow consideration, should suitable developments come forward
that provide good value for money compared to the average costs of
developing our own new build properties from scratch. This strategic approach
can rapidly increase the supply of social homes and meet urgent local housing
needs, including reducing the use of costly temporary accommodation. Key
considerations for OTS property acquisitions include development availability
and timing, location compared to where our need and demand assessments
have identified, house type and layout compared to our needs within that
location, specification the developer will build to, cost per unit, and future
maintenance and estate management requirements. This is a new area under
active consideration by officers to identify any viable opportunities within North
Ayrshire. Should a viable opportunity be identified, this will be presented to
Cabinet for approval. 
2.19 The Rural Affordable Homes for Key Workers Fund, previously known as
the Rural Key Workers Housing Fund, provides up to £25 million nationally
through to March 2028 to help local authorities identify affordable homes for
key workers in rural communities. This funding is made available from the
Affordable Housing Supply Programme and therefore is only accessible to local
authorities and RSLs. Key workers can include public sector and emergency
service workers; however, the definition of a key worker is determined on an
individual basis by local authorities according to their local priorities. In North
Ayrshire, the Arran Local Lettings Initiative provides an example of a definition
of key workers, taking a tiered approach. 
2.20 Guidance provided by the Scottish Government on the Rural and Key Workers
Housing Fund outlines that local authorities and RSLs can use the fund to
purchase existing suitable properties in rural areas, which can be rented
directly or leased to employers to provide affordable homes for key workers.
This can include: 
• Bringing empty properties back into use, or 
• Acquiring properties on the open market to increase the available supply of
affordable homes for key workers. 
2.21 Void and Acquisition Fund: The Scottish Government agreed to invest at least
£60 million through the Affordable Housing Supply Programme (AHSP) in 2023
60

Page 61

to 2024 to support a National Acquisition Programme. Building on the National
Acquisition Programme, the Scottish Government announced in April 2024 that
£80 million would be added to the Affordable Housing Supply Programme over
2024 to 2025 (£40 million) and 2025 to 2026 (£40 million). Resultantly, in
September 2024, the Scottish Government increased North Ayrshire Council’s
Resource Planning Assumption. This uplift was to be directed towards: 
• Acquisitions to help address temporary accommodation pressures, or 
• To bring long term voids back into use. 
2.22 In 2024/25, one property was bought using this fund and in 2025/26, five
properties were bought using this fund. 
There is no separate funding for acquisitions for 2026/27 and beyond; this
reflects the Scottish Government’s aim of giving flexibility to local authorities to
determine their appropriate priorities between new builds and second-hand
acquisitions. If any such fund becomes available, North Ayrshire Council will
engage with the Scottish Government and stakeholders to make the most
effective use of any funding that may become available for North Ayrshire. 
2.23  Estate Based Regeneration Programme (EBRP): In January 2019, the
Council’s 10-year, £10 million EBRP was approved. The aim of the EBRP is to
improve Council-owned housing estates across North Ayrshire by addressing
low demand stock, antisocial behaviour, external appearance, parking
provision, road and footpath condition, fencing, landscaping, and general
grounds maintenance issues. The Housing Regeneration Team will acquire
properties identified in the EBRP for the purposes of: 
• Demolition
• Refurbishment
• Purchasing four-in-a-block flats where this would result in the Council’s
majority ownership in the block 
2.24 The SHIP 2026 to 2031 includes for the provision of funding for 249 units to
assist the delivery of Housing’s Estate Based Regeneration Programme. This
investment programme aims to provide new homes to replace any stock which
requires to be demolished or reconfigured as part of the EBRP. 
2.25 The proposed approach allows North Ayrshire Council to ensure they are
maximising the funding streams available whilst targeting properties that meet
the strategic needs for the areas through a range of acquisition opportunities.
Acquisitions will sit within the Housing Strategy Team to ensure that our
housing acquisitions meet the strategic needs identified through the Local
Housing Strategy, Housing Need and Demand Assessment, Strategic Housing
Investment Plan, Local Housing Plans, Scheme of Assistance, and the
Homeless Prevention Strategy. 
2.26 The ECRIA screening has been conducted, and it has determined that a full
assessment is not required for this strategy. A full ECRIA has been completed
for the Local Housing Strategy, which includes acquisitions.
61

Page 62

3. Proposals 
3.1  That Cabinet approves the North Ayrshire Housing Acquisition Strategy 2026 -
2031 at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial
4.1  The financial implications arising from targeted housing acquisitions are
accounted for within existing 2026-2031 HRA budgets. Business cases will be
developed to support any new initiatives, as required. 
Human Resources 
4.2  None. 
Legal
4.3  Housing Services will continue to liaise with Legal Services, where required, to
facilitate housing acquisitions. 
Equality/Socio-economic
4.4  The Housing Acquisition Strategy will have a positive impact by aiming to
increase the availability of permanent homes to meet the affordable housing
need and demand in North Ayrshire. An ECRIA screening has been conducted
for the Housing Acquisition Strategy, and it has determined that a full
assessment is not required. A full ECRIA was completed for the Local Housing
Strategy 2023-2028, which includes acquisitions. 
Climate Change and Carbon
4.5  The Housing Acquisition Strategy will support the Sustainable North Ayrshire
Strategy 2024 - 2027, which aims to eradicate fuel poverty and achieve net-
zero carbon status by 2030, by ensuring that homes acquired by the Council
are brought up to appropriate sustainability standards. 
Key Priorities 
4.6  The Housing Acquisition Strategy will support the Council Plan strategic
priorities: ‘Wellbeing;’ ‘Climate Change;’ ‘A Sustainable Council;’ and
‘Communities and Local Democracy.’ by increasing the number of affordable
homes in North Ayrshire that meet residents’ needs. 
Community Wealth Building
4.7  None
62

Page 63

Islands Communities Impact Assessment (ICIA)
4.8 The Housing Acquisition Strategy does not identify unique impacts faced
specifically by our islands. Whilst the strategy covers the whole of North Ayrshire,
it is fully recognised that delivering homes on islands can be more complex and
expensive than on the mainland. Under existing arrangements, NAC Housing
services work closely with the Registered Social Landlords (RSLs) on our islands
and provide support where required. This can include supporting applications to
the Scottish Government for additional funding to help the RSL make a housing
acquisition where property prices are higher than they would be on the mainland.
United Nations Rights of the Child (UNCRC)
4.9  It is anticipated that the Housing Acquisition Strategy will lead to positive impacts
on children and young people, as more children will have access to safe and
well-maintained housing through an increase in the availability of permanent
homes to meet the affordable housing need and demand in North Ayrshire.
Consumer Duty
4.10 Acquiring housing and improving it to the standards required helps to improve
overall housing condition, increases social/affordable housing stock, and helps
to bridge some of the gap between supply and demand in relation to new build
programmes. The acquisition of housing can further assist our island and rural
communities through additional provision of affordable housing for e.g., key
workers in areas where there is identified need. Housing acquisitions are also
usually quicker to complete sales on and for a lower cost than that of new build
housing.  This in turn means that, through property acquisitions, our consumers
e.g., those on the Common Housing Register, will be positively impacted through
increased stock, in turn improving their chances of getting a new affordable
home.
5. Consultation
5.1 Prior to development of the strategy, cross-service meetings were held to
determine key objectives and criteria, with attendees from Building Services,
the Private Sector Housing Team, Homeless & Community Safety, Housing
Strategy, Business Improvement, Business Planning, Affordable Housing &
Regeneration, and Governance.
David W. Hammond
Executive Director (Communities & Housing)
For further information please contact Fiona Ellis, Senior Manager (Housing
Strategy & Development), on 01294 324031. 
Background Papers
63

Page 64

Local Housing Strategy 2023 to 2028
Strategic Housing Investment Plan 2026 to 2031 
64

Page 65

Appendix 1
NORTH AYRSHIRE
Housing Acquisition Strategy
2026 to 2031
65

Page 66

1 
Contents 
1. Introduction ......................................................................................................................................... 2
Background to the Strategy ................................................................................................ 2
Affordable Housing Supply Programme ............................................................................... 2
Aim of the Strategy ............................................................................................................. 2
Objectives of the Strategy ............................................................................................................ 2
Criteria and Value for Money ........................................................................................................ 3
2. Acquisition Programmes ..................................................................................................................... 4
Strategic Housing Investment Plan ...................................................................................... 4
Empty Homes & Second Homes .................................................................................................. 4
Adaptations .................................................................................................................................... 5
Affordable Housing Initiative for Key Workers ............................. Error! Bookmark not defined.
Void and Acquisition Fund ......................................................... Error! Bookmark not defined.
Estate Based Regeneration Programme .............................................................................. 6
3. Further Information .............................................................................................................................. 7
Budget ............................................................................................................................... 7
Resources .......................................................................................................................... 8
Equal Opportunities ............................................................................................................ 8
Review ............................................................................................................................... 8 
66

Page 67

2 
1. Introduction 
Background to the Strategy
North Ayrshire Council’s Local Housing Strategy 2023 to 2028 commits to increasing the social
housing supply by buying back former social housing stock and bringing empty homes back into
use through buy backs. However, in line with the aim of the strategy, North Ayrshire Council will
explore other viable solutions, particularly where properties in demand have not been built by
North Ayrshire Council or other social housing providers. This will include purchasing homes
from the open market, developers, and off-the-shelf purchases. To target acquisitions that will
have the most effective impact, the Council will take a comprehensive approach by comparing
current need and demand to current supply and stock turnover. 
For more information on the Local Housing Strategy 2023 to 2028, visit the Local Housing
Strategy page on the North Ayrshire Council website. 
Affordable Housing Supply Programme
The Affordable Housing Supply Programme comprises a range of funding mechanisms to enable
affordable housing providers to deliver homes for social rent, mid-market rent, and low-cost
home ownership in communities across Scotland to support local authorities’ Local Housing
Strategies.
The Affordable Housing Supply Programme can support the following types of purchase where
there is a strategic housing need, as identified and agreed by the local authority:
• Open market purchases with vacant possession
• Off market purchases with vacant possession
• Purchases where an owner occupier cannot afford the required maintenance or
refurbishment of their home and wishes to sell and remain in the home as a tenant in the
social rented sector
• “Off the shelf” purchases from developers
• Properties from landlords leaving the private rented sector with a tenant in situ, where
this meets a clear strategic purpose and where the tenant is at risk of homelessness
For more information on the guidance, visit the Acquisition Programme: information page on the
Scottish Government website.
Aim of the Strategy
The aim of this strategy is to increase the availability of permanent homes to meet the affordable
housing need and demand in North Ayrshire. 
To be considered for acquisition, properties must support one or more of the objectives of the
strategy and must meet one or more of the criteria of the strategy. 
Objectives of the Strategy
• Meet demand in the highest‑need areas, as identified through the Housing Needs and
Demand Assessment (HNDA) and ongoing demand analysis.
• Assist in delivering the Strategic Housing Investment Plan, which sets out the affordable
housing investment priorities within North Ayrshire
• Help achieve the strategic outcomes set out in the Local Housing Strategy:
o More homes at the heart of great places
67

Page 68

3 
o Affordability & Choice
o Affordable Warmth & Zero Emissions
o Improving the quality of our homes
• Identify opportunities to acquire properties on the open market or through speculative
approaches from owners where this supports strategic housing need
• Increase the number of long‑term empty properties brought back into use through
effective collaboration with the Council’s Private Sector Housing Advice Team.
• Continue to assess any opportunities for acquisition that arise in suitable housing supply
influenced through the impact of the application of the 100% premium in Council tax for
second homes, across the mainland and both island communities.
• Enhance block sustainability and support future maintenance by increasing Council
ownership in partially factored blocks through proactive engagement with private
owners.
• Support the reduction of homelessness by ensuring, where appropriate, that acquired
properties contribute to meeting the housing needs of households in temporary
accommodation.
Criteria and Value for Money 
A property must meet specific requirements to demonstrate best value for money. Therefore, to
be considered by North Ayrshire Council for acquisition, properties will form part of the overall
social rented stock once purchased and must – in addition to being of a property type or size with
a recognised need or demand - meet one or more of the criteria below, in addition to any other
criteria specified:
• Ex-local authority stock, within North Ayrshire Council estates, which will facilitate
effective and efficient housing management.
• “Off the shelf” purchases from developers
• Located in an area identified as having an affordable housing shortfall.
• Purchase price will be less than the development costs of building a comparable
property. Properties which cost more than this will be considered on a case-by-case
basis, e.g., if the property is highly adapted and meets the requirements of an applicant
with an accessible housing need. 
• Long term empty properties, where the purchase would allow for greater local amenity
and contribute to the Council’s statutory duties and strategic objectives. 
• The property will be able to achieve and be maintained to a standard acceptable to the
Council, e.g. to the SHQS and EESSH2/ SHNZS. 
• The purchase price is equal to, or a reduction of, the actual market value as assessed by
the Council’s valuation report/ Home report valuation. This will not prevent higher cost
projects from proceeding (including projects in regeneration areas, remote, rural and
island areas, and those involving housing for people with particular needs).
• Of standard construction only (due to the legal and cost implications they could incur if
otherwise).
Any decision to acquire a property is at the discretion of North Ayrshire Council and is subject
to the availability of relevant funding. If purchased, properties will be improved to meet the
Scottish Housing Quality Standard (SHQS) and the Energy Efficiency Standard for Social
Housing (EESSH2)/ Social Housing Net Zero Standard (SHNZS). 
68

Page 69

4 
2. Acquisition Programmes
Four acquisition programmes are currently being utilised in North Ayrshire. 
Strategic Housing Investment Plan  
The Strategic Housing Investment Programme 2026 to 2031 (SHIP) includes provision for 65
Council acquisitions between April 2024 and March 2031, as well as 37 acquisitions by
developing Registered Social Landlord (RSL) partners, subject to the availability of grant funding.
Both North Ayrshire Council’s and RSLs’ acquisition programmes aim to increase affordable
housing in the area, as well as contribute to wider regeneration and estate management. 
For more information, the Council’s Strategic Housing Investment Programme 2026 to 2031 can
be accessed online. 
Empty Homes & Second Homes
As at 1 April 2026, there are 582 empty homes subject to the Council Tax levy in North Ayrshire.
Additionally, there are approximately 1,300 second homes in North Ayrshire, the majority of
which are located on the islands of Arran and Cumbrae. The SHIP 2026 to 2031 makes provision
for empty and second home buy backs, with the Council’s Private Sector Advice Team providing
advice and assistance on empty homes.
Further information on the Council’s Private Sector Advice Team can be found on the Private
Sector Advice Service webpage.. 
Bringing former social housing stock into ownership can assist with housing management,
maintenance issues, and increase housing available through the North Ayrshire Housing
Register. Over the past five financial years the Council has acquired five empty homes, using
funding from the Affordable Housing Supply Programme, which have been brought back into use
as Council stock. 
A compulsory purchase order (CPO) can be made when we need to acquire land for purposes
that are in the public interest, where we cannot reach an agreement to acquire the land, or the
owner cannot be traced. A CPO may be used to bring empty homes back into use or to regenerate
an area. When we make a CPO, we must apply to the Scottish Government for confirmation of
the order.
Further information on CPOs in North Ayrshire can be found at Compulsory purchase orders
webpage.
Strategic Housing
Investment Plan 
Rural Affordable Homes
for Key Workers
Void and Acquisition
Fund
Estate Based
Regeneration Programme 
69

Page 70

5
Adaptations
North Ayrshire Council may purchase properties for the use of specific applicant needs where no
suitable Council or RSL property exists and where the cost of purchasing the property would be
more cost effective than making adaptations and alterations to existing stock. Properties should
be purchased with vacant possession. 
North Ayrshire Council may consider purchasing private rented or owner-occupied properties
where the tenancy or ownership is at risk, and the property has been substantially adapted in a
major, permanent way to meet the needs of the tenant or household. The tenant or owner should
have a live North Ayrshire Housing Register application and there should be no suitable Council
or RSL property which meets the needs of the applicant (including consideration of the costs of
adapting existing stock).
“Off-the-shelf"
"Off-the-shelf" (OTS) property acquisitions in social housing refer to the purchase of already
completed new build/ or proposed, or newly refurbished properties from a developer or private
owner, ready for immediate occupation by social housing tenants. 
This approach is a strategic tool used by councils and housing associations, and, in the right
circumstances, can:
• Rapidly increase the supply of social homes and meet urgent local housing needs,
including reducing the use of costly temporary accommodation.
• Offer value for money compared to other housing delivery options.
Key considerations for OTS property acquisitions include development availability and timing, location
compared to where our need and demand assessments have identified, house type and layout
compared to our needs within that location, specification the developer will build to, cost per unit,
and future maintenance and estate management requirements. This is a new area under active
consideration by officers to identify any viable opportunities within North Ayrshire. 
Property Identification
There are a number of ways the Council identifies a pipeline of opportunities. This includes but
is not limited to:
• Officers regularly review properties that are for sale on the open market and have
established relationships with local estate agents who identify potential opportunities.
• Direct contact has been made by owners interested in selling their properties to the
Council. Through the implementation of this strategy, a new process will be developed to
make it easier for owners to provide their property information.
• The Private Sector Advice Team identify empty homes that meet the Council’s criteria for
acquisition and will actively contact owners to discuss their interest in bringing their
property back into use via the Council or and RSL purchasing the property.
• Properties are identified by the Factoring Team where a block can be brought back into
full Council ownership.
Rural Affordable Homes for Key Workers
The Rural Affordable Homes for Key Workers Fund provides up to £25 million nationally through
to 2028 to help local authorities identify affordable homes for key workers in rural communities.
This funding is made available from the Affordable Housing Supply Programme and therefore is
70

Page 71

6 
only accessible to local authorities and RSLs. The fund focuses on making available underused
or empty properties for key workers and others in need. 
Much of North Ayrshire is classified as Accessible-Rural under the Scottish Government’s Urban
Rural 6-fold Classification, with the islands of Arran and Cumbrae classified as Remote Rural.
Key workers can include public sector and emergency service workers; however, the definition
of a key worker will be determined on an individual basis by local authorities according to their
local priorities. In North Ayrshire, the Arran Local Lettings Initiative provides an example of a
definition of key workers, taking a tiered approach.
For more information, please see the Housing Allocation Policy.
Guidance provided by the Scottish Government on the Rural Affordable Homes for Key Workers
Fund outlines that local authorities and RSLs can use the fund to purchase existing suitable
properties in rural areas, which can be rented directly or leased to employers to provide
affordable homes for key workers. This can include:
• Bringing empty properties back into use, or 
• Acquiring properties on the open market to increase the available supply of affordable
homes for key workers.
In line with the Scottish Government’s guidance, North Ayrshire Council will engage with a range
of organisations to develop proposals for use of the fund for consideration by the More Homes
Division, including:
• Public sector employers
• Key agencies, including Highlands and Islands Enterprise
• Local businesses, and 
• Registered Social Landlords
For more information, the guidance on the approach to the Rural Affordable Homes for Key
Workers can be found on the Scottish Government website. 
Properties acquired using the Rural Affordable Homes for Key Workers Fund are acquired in
addition to the properties outlined for acquisition in the SHIP 2026 to 2031. From 2023/24, seven
properties were acquired on Arran by Trust Housing Association using this funding stream. The
SHIP 2026 to 2031 highlights that there are no current projects being considered for the Rural
Affordable Homes for Key Workers in North Ayrshire beyond acquisitions being progressed by
Trust Housing Association. The Arran Housing Task Force will continue to work collaboratively to
identify and discuss potential opportunities to further use the fund to provide affordable housing
for key workers in rural areas, where appropriate.
Estate Based Regeneration Programme
In January 2019, the Council’s 10-year, £10 million Estate Based Regeneration Programme
(EBRP) was approved. The aim of the EBRP is to improve Council-owned housing estates across
North Ayrshire by addressing low demand stock, antisocial behaviour, external appearance,
parking provision, road and footpath condition, fencing, landscaping, and general grounds
maintenance issues. The Regeneration Team will acquire properties identified in the EBRP for the
purposes of:
• Demolition 
• Refurbishment
71

Page 72

7 
• Purchasing four-in-a-block flats where this would result in the Council’s majority
ownership in the block
The SHIP 2026 to 2031 includes for the provision of funding for 249 units to assist the delivery of
Housing’s Estate Based Regeneration Programme. This investment programme aims to provide
new homes to replace any stock which requires to be demolished or reconfigured as part of the
EBRP. As of 1 April 2026, a total of 17 properties have been acquired under the EBRP across North
Ayrshire in the areas of Ardrossan, Stevenston, Saltcoats, Irvine, and Kilwinning. 
Void and Acquisition Fund
The Homelessness Prevention and Strategy Group, co-chaired by Scottish Ministers and the
Convention of Scottish Local Authorities (COSLA), established the Temporary Accommodation
Task and Finish Group to advise on the short-term measures needed to address the increasing
use of temporary accommodation. Thereafter, the Scottish Government agreed to invest at least
£60 million through the Affordable Housing Supply Programme (AHSP) in 2023 to 2024 to support
a National Acquisition Programme. 
Building on the National Acquisition Programme, the Scottish Government announced in April
2024 that £80 million would be added to the Affordable Housing Supply Programme over 2024 to
2025 (£40 million) and 2025 to 2026 (£40 million). Resultantly, in September 2024, the Scottish
Government increased North Ayrshire Council’s 2024 to 2025 Resource Planning Assumption.
This uplift was to be directed towards:
• Acquisitions to help address temporary accommodation pressures, or 
• To bring long term voids back into use. 
Acquisitions were to be existing properties or new build properties off the shelf but were required
to be a permanent structure and available in perpetuity. In line with the guidance, any homes
purchased using this funding were allocated in line with the legal framework for allocations and
in accordance with North Ayrshire Council’s Allocation Policy. In September 2025, the Scottish
Government published its Housing Emergency Action Plan, which led to funding for the targeted
voids and acquisition fund increasing further. In 2024/25, one property was bought using this
fund and in 2025/26, four properties were bought using this fund.
For more information, further detail can be found on the Scottish Government website.
There is no specific funding for acquisitions announced for 2026/27 and beyond; this recognises
Scottish Government’s commitment to providing flexibility to local authorities to determine their
appropriate priorities between new builds and second-hand acquisitions. If any such fund
becomes available, North Ayrshire Council will engage with the Scottish Government and
stakeholders to make the most effective use of any funding that may become available for North
Ayrshire. 
3. Further Information
Budget
The Senior Manager (Housing Strategy & Development) is responsible for the Housing Revenue
Account Capital Budget to finance the purchase of private properties. The Team Manager
(Affordable Housing and Regeneration) will maintain a budget monitor for each funding stream.
72

Page 73

8
Resources
This strategy will be supported and implemented by staff from Housing Services, Building
Services, Property Management & Investment, Legal Services, and Finance. 
Equal Opportunities
The provision of new social housing, including through housing acquisitions, will have a positive
impact on those who require specialist accommodation, older people, those who are homeless,
or at risk of homelessness, and those for whom purchasing a home is not an affordable option.
The benefits of new build housing in relation to health, wellbeing, and educational attainment are
well documented. New housing will also support our island communities and their economies.
A reduction in new build completions will have a negative impact on these groups.
Review
This strategy will be reviewed on an annual basis in line with the Strategic Housing Investment
Plan, or on such a basis as is required to ensure the accuracy of all criteria and funding
information.
73

Page 74

9
Comments and views about any aspect of this
document are welcomed. We also take the
opportunity to encourage local people to
become involved in the planning and delivery of
housing solutions. To get in touch, please
contact:
Local Housing Strategy
North Ayrshire Council
Housing & Public Protection
FREEPOST SCO2742
Irvine 
KA12 8BRT: 
Developmentandstrategy@north-ayrshire.gov.uk
This document is available in other formats
such as audio tape, CD, Braille, large print, and
other languages on request.
74

Page 75

Version: 7.0
North Ayrshire Council
Equality & Children’s Rights Impact Assessment
(Screening Form)
Please Note: Before you begin, is this version the most up to date?  You can
download the most recent version on Connects. Screenings and ECRIAs should be
included with relevant Committee Reports and may be published on our website.
This screening form encompasses key pieces of legislation which the Council needs to
assess its activities against. This form should assist in deciding whether a full impact
assessment is required.
• The Public Sector Equality Duty requires that we demonstrate that we are making
decisions in a fair, transparent and accountable way. The Council must show that it
has considered the needs and rights of people with protected characteristics.
• Where decisions affect young people, we must consider the ‘Rights of the Child’,
under the United Nations Convention on the Rights of the Child (UNCRC).
• We must consider the Socio-Economic Impact under the Fairer Scotland Duty.
• We need to consider whether any of our Islands may be impacted differently from
the mainland under the Island’s Act.
• We also need to consider whether ‘consumers’ of our Services will be impacted
under the Consumer Duty.
The various duties require the Council to assess the ‘impact’ of proposals thoroughly
before any decisions are taken. This should be proportionate to the decision that is being
made and should be carried out as early as possible in the process. It can then be
repeated as the policy/proposal is progressed. Further Guidance on carrying out an
impact assessment can be found in our Equalities pages on Connects.
1. Proposal
Title: Housing Acquisition Strategy
Budget reference number and heading if appropriate (or not applicable):
n/a
Amount (£) of saving if appropriate (or not applicable):
n/a
Service: Housing and Communities
Lead officer: Fiona Ellis
List of participants in the assessment: n/a
Date completed: 13/04/2026
75

Page 76

Version: 7.0
2. What are the main aims of the proposal?
The aim of this strategy is to increase the availability of permanent homes
to meet the affordable housing need and demand in North Ayrshire.  
The proposed North Ayrshire Housing Acquisition Strategy will support the following
Local Housing Strategy (LHS) actions:
• Deliver 1,666 new units of social housing
• Consider opportunities to provide homes in and around our town centres
• Support the Scottish Government's target to deliver 110,000 new
affordable homes by 2032 by delivering the projects set out within the
Strategic Housing Investment Plan
• Increase the social housing supply by buying back former social housing
• Bring empty homes back into use through the buyback scheme
• Ensure that the Strategic Housing Investment Plan addresses current and
future demographic needs. 
The Housing Acquisition Strategy will contribute to the Strategic Housing Investment
Plan (SHIP), helping to achieve the Council Plan priorities and strategic aims by:
• Through our housebuilding programme and wider housing investment,
providing homes for life that meet the needs of our residents
• Increasing the number of homes in the area through a mix of private
and social developments and bringing empty buildings back in to use
• Ensuring our places and spaces where we live, work and visit are well
maintained and accessible
• Reducing the carbon footprint of our estate through rationalisation
utilising a locality-based approach and taking a fabric first and low
carbon energy generation approach to homes and buildings
3. What data, research or other evidence was used for this
screening?
The function of buy backs/acquisitions has been ongoing for a number of years and
included as part of the Local Housing Strategy (LHS). The only change is the
creation of a standalone strategy. 
4. Screening questions
Does the proposal affect service users, employees or the wider community –
particularly services that are known to be important to protected groups?
Please delete whichever statement is not applicable from the text below:
Yes, the proposal does affect service users, employees or the wider community and
specifically to services that are known to being important to particular protected
groups.
76

Page 77

Version: 7.0
Is it a major proposal, significantly affecting how services are delivered or how
other organisations operate?
Please delete whichever statement is not applicable from the text below:
No, it is not a major proposal, significantly affecting how services are delivered or
how other organisations operate.
Does it relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes? 
Please delete whichever statement is not applicable from the text below:
Yes, it does relate to an area where there are known inequalities or has significant
potential for reducing inequalities or improving outcomes.
77

Page 78

Version: 7.0
5. Impact
Are there any impacts on the following groups?
Age (young/old people); Disability (physical and learning disabilities); Gender Re-
assignment; Pregnancy and Maternity; Race and Ethnic Origin; Religion or Belief;
Sex; Sexual Orientation; Marriage and Civil Partnership; Care Experienced; Fairer
Scotland Duty; Human Rights; Other (Homelessness, rural, carers, part-time
workers, etc)
Yes – The provision of new social housing, has a positive impact on those who
require specialist accommodation, older people, those who are homeless, or at risk
of homelessness, and those for whom purchasing a home is not an affordable
option.  The benefits of new build housing in relation to health, wellbeing, and
educational attainment are well documented. New housing also supports
our island communities and their economies. 
If yes or unsure, you should consider carrying out a full impact assessment.
Click or tap here to enter text.
6. The Fairer Scotland Duty – (reducing the socio-economic
impact of our policies, strategies and budget decisions)
Does the proposal have any negative (or potential) positive impacts
that need to be explored in more detail? (Please provide a brief
summary)
The Housing Acquisition Strategy has a positive impact by aiming to increase the
availability of permanent homes to meet the affordable housing need and
demand in North Ayrshire.  
Low income/poverty – the Housing Acquisition Strategy does not include any
proposals to assist people who cannot afford to maintain regular payments
such as bills, food, and clothing. However, any person that benefited from a
tenancy in a home that was purchased under the scheme would have access to
assistance / support as a social housing tenant.
Low/no wealth - The Housing Acquisition Strategy has the potential to have
positive impacts on people who have low incomes and low wealth, e.g., through
provision of increased volume of good quality affordable homes.  
Material deprivation – Through increased social/affordable housing stock, we
would be able to help more of our residents affected by material deprivation
through an increased number of good quality, affordable homes.  
78

Page 79

Version: 7.0
7. Children’s Rights (UNCRC)
Does the proposal have any impact in relation to the UNCRC articles for
Children’s Rights?
Yes – the Housing Acquisitions Strategy would have a positive impact on Article
27 whereby more children would have access to safe and well-maintained
housing through an increase in the availability of permanent homes to meet the
affordable housing need and demand in North Ayrshire.
8. Island Proofing
Are there any special considerations for the island communities
within North Ayrshire?
Whilst the strategy covers the whole of North Ayrshire, it is fully recognised that
delivering homes on islands can be more complex and expensive than on the
mainland.  Whilst the strategy itself doesn’t specify any special considerations
for our island communities, there is a focus on them through the working
process.  NAC Housing services work closely with the Registered Social
Landlords (RSLs) on our islands and provide support where required.  This can
include supporting applications to the Scottish Government for additional
funding to help the RSL make a housing acquisition where property prices are
higher than they would be on the mainland.
9. Consumer Duty
Is your proposal a decision that will impact on consumers? (The
definition of consumer is ‘an individual or a small business that
purchases, uses or receives goods or services in Scotland, that are
supplied either by a business or a public body’.  Please see What is
the Consumer Duty for more details)
Yes - Acquiring housing and bringing it up the standards required helps to
improve overall housing condition, increases social/affordable housing stock and
helps to bridge some of the gap between supply and demand in relation to new
build programmes.  The acquisition of housing can further assist our island and
rural communities through additional provision of affordable housing for e.g. key
workers in areas where there is identified need.  Housing acquisitions are also
usually quicker to complete sales on and for a lower cost than that of new build
housing.  This in turn means that through property acquisitions our consumers
e.g. those on the Common Housing Register, will be positively impacted through
increased stock/in turn improving chances of getting a new affordable home.
79

Page 80

Version: 7.0
10. Have any cross-cutting impacts been identified from other
Council Services or Partner Agencies (such as discrimination
across multiple groups or accumulated effects of multiple
proposals on a single group)?
no
11. Has there been any engagement or consultation on the
proposal with any groups, services or partner organisations
that could help inform the impact assessment?
n/a
12. What are the monitoring and review arrangements?
This strategy will be reviewed on an annual basis in line with the
Strategic Housing Investment Plan, or on such a basis as is required to ensure
the accuracy of all criteria and funding information.
13. Considering this Equality Screening in its entirety, what is your
recommended next step? (Please explain your decision.)
Screening Only no further assessment is required.  (Your explanation must
include how this decision will be monitored and reviewed as the policy /
decision is implemented.)
No further assessment required.  This strategy will be reviewed on an annual
basis in line with the Strategic Housing Investment Plan, or on such a
basis as is required to ensure the accuracy of all criteria and funding
information.  
14. Authorisation
Policy Lead/Manager: Click or tap here to enter text.
Date: Click or tap to enter a date.
Head of Service: Click or tap here to enter text.
Date: Click or tap to enter a date.
80

Page 81

Briefing Note: Audit & Scrutiny Committee 15th June 2026
Housing Acquisition Strategy
Introduction 
The Housing Acquisition Strategy has been developed to establish the principles of the
Council’s long-standing approach to acquiring homes for social housing stock. The
acquisition of existing properties is designed to increase the supply of affordable
housing available for North Ayrshire Housing Register applicants and complement the
Council’s housebuilding programme.
Considerations
The Strategy sets out a versatile approach to increasing affordable housing supply
through a range of means. As the Cabinet report notes at paragraph 2.18, ‘off-the-shelf’
(OTS) property acquisitions are a new area under active consideration by officers. Any
viable OTS opportunities identified would be the subject of future Cabinet approval,
including appropriate consideration of community wealth building implications. 
Anticipated Benefits of OTS
A selective and strategic approach to OTS property acquisitions would allow the Council
to rapidly increase the supply of affordable housing, meet urgent local housing needs,
and reduce the use of costly temporary accommodation. 
Any OTS scheme progressed would primarily be intended to complement the Council’s
housebuilding programme. It should be noted that the Council’s housebuilding
programme is subject to competitive tender through the procurement process and does
not guarantee contract award to a locally-based builder. 
The Council would be able to negotiate Community Wealth Building clauses as part of
any contract for OTS which would be aligned to the Council’s Community Wealth
Building strategy and principles. In addition, it is understood that private developers are
generally committed to creating local employment and economic growth opportunities
both directly and indirectly through sub-contractors and the wider supply chain. 
Alongside community wealth building considerations, any OTS scheme proposed would
be carefully reviewed with reference to:
• Development availability (what and where schemes are available)
• Delivery timescales (when the completed homes would become available)
• Availability of Scottish Government grant funding (either scope within the
Strategic Housing Investment Plan to accommodate schemes or slippage
funding from other local authority area programmes)
• Housing need and demand (demand for housing in the locality proposed)
Appendix 2
81

Page 82

• House type and layout 
• Property specifications 
• Affordability and value for money
• Estate management requirements (future maintenance considerations)
Over the past ten financial years the Council has been able to claim an additional
£7.273m above our annual Resource Planning Assumptions commitments from
slippage in other local authority programmes. 
Progressing with OTS acquisitions may assist the Council in accessing any available
programme slippage from other local authority areas and ensure that any slippage
experienced from the Council’s or our local Registered Social Landlord partners main
development programmes could be mitigated. This provides an opportunity to
maximise investment potential within North Ayrshire.
As of 1 June 2026, there were a total of 6,160 applications on the North Ayrshire Housing
Register (NAHR). Due to the number of people on our housing register, this necessitates
a diversified approach and maximisation of opportunities to increasing our housing
supply. OTS has the potential to increase our housing supply at pace as it can provide
early delivery options that meet the needs of our current and future applicants in North
Ayrshire by bringing private assets into public ownership.
Increasing housing supply also creates a sustained pipeline of opportunities for
apprenticeships and long-term employment within Building and Housing Services. As
new homes are built and existing stock expands, there is a corresponding rise in
demand for skilled trades and technical specialists needed to ensure properties remain
safe, compliant, and energy efficient over their lifecycle. This growth enables
investment in apprenticeship programmes, providing entry routes for young people
while addressing skills shortages in critical areas. Overall, expanding housing stock not
only helps meets housing demand but also acts as a catalyst for workforce
development and economic growth within the local community.
Practice Elsewhere
OTS purchases are being utilised by local authorities across Scotland with support from
the Scottish Government, including most recently in Fife and North Lanarkshire
Councils. 
82

Page 83

NORTH AYRSHIRE COUNCIL
15 June 2026                                                                                                                                                            
Audit and Scrutiny Committee
Title: Call In: Ardrossan Campus Project Update
Purpose: To allow the Committee to consider a call-in request in respect
of the decision taken by Cabinet at its meeting on Tuesday 2
June 2026 to note the current progress of the Ardrossan
Campus project, including current projections in relation to costs
and programme.
Recommendation: That the Committee considers the terms of the call-in and agrees,
or otherwise, to make a recommendation to Cabinet.
1. Executive Summary
1.1    In terms of the Scheme of Administration (Section 5), the Audit and Scrutiny Committee
has a remit to consider call-in requests and invite at least one of the Members who has
requested the reference to call-in to attend the Committee to explain the request.
1.2 This report sets out the background to a call-in request in respect of the decision
taken by Cabinet at its meeting on 2 June 2026 in relation to the report on the current
progress of the Ardrossan Campus project, including current projections in relation to
costs and programme.
2. Background
2.1 The Cabinet, at its meeting on 2 June 2026, considered a report on the current
progress of the Ardrossan Campus project, including current projections in relation to
costs and programme.
2.2 A request was received in terms of the call-in procedure set out in the Council's
Scheme of Administration and Standing Orders, that the Audit and Scrutiny
Committee examine the decision taken by the Cabinet.
2.3 The call-in request, which was signed by Councillors Stalker, Murdoch and Stephen is
in the following terms: -
Reason for call-in
“This decision is being called in because there are some real concerns about how
the Ardrossan Campus project is progressing. The report shows a significant cost
increase of around £10 million, along with delays pushing completion back to May
Agenda Item 4
83

Page 84

2028. 
There are also questions about how risks have been handled, especially around
ground contamination and the challenges of building on a contaminated site. It’s
not clear if these issues were fully understood early on, or if more could have
been done to avoid the impact they have had. On top of that, using additional
capital funding to cover the extra costs raises concerns about what this means
for and the overall budget of the campus and what more flexibility funding will be
made available in future budgets. 
Overall, this call-in is about getting reassurance that the project is still under
control, that risks are being properly managed, and that it continues to represent
good value for the Council and local communities.” 
Desired Outcome 
“To provide assurance on and seek greater information on the cost,
programme, risk management, governance and wider capital implications of the
Ardrossan Campus project, ensuring it remains deliverable, financially
sustainable and represents value for money.” 
2.4 A copy of the original report, prepared by the Executive Director of Place and
presented to Cabinet on 2 June 2026 is attached as Appendix 1 to this report. 
2.5 The call-in request is valid for consideration by the Committee. The request was
received within the appropriate timescale, it was requested by three Elected Members
and details were provided on both the reason for the call-in and the desired outcome. 
2.6 The Elected Members who have submitted the call-in will be invited to address the
Committee to explain the respective call-in request.  The appropriate Cabinet Member
will then be invited to clarify the reasons for the decision. The relevant senior officer
will also be present to provide information on the report presented to Cabinet and on
issues raised by the call-in received. The Committee will have an opportunity to ask
questions of both parties and of those officers in attendance. 
2.7 The Committee will then debate the call-in request and decide whether or not it agrees
with the decision of the Cabinet. 
2.8    The Audit and Scrutiny Committee:- 
i) decides if it agrees or not with the decision of the Cabinet; and
ii) if it does not agree with the decision, considers what alternative action the
Committee would recommend to the Cabinet. 
2.9   If the Committee supports the decision of Cabinet and does not accept the call-in, the
original decision of Cabinet remains in effect and no further procedure is required. 
2.10 If the Committee accepts the call-in, the matter is referred to Cabinet with a
recommendation. When the matter is considered by the Cabinet, the Chairperson or
another member of the Audit and Scrutiny Committee will have the right to attend the
Cabinet and speak in support of any recommendation. 
84

Page 85

2.11 In the event that Cabinet declines to accept the recommendation from the Audit and
Scrutiny Committee, the matter will be referred to Council for determination. The
decision of the Council will be final. 
3. Proposals 
3.1 It is proposed that the Committee considers the call-in request. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are outlined in the Ardrossan Campus Project Update report
attached at Appendix 1. 
Human Resources 
4.2 The human resource implications are outlined in the Ardrossan Campus Project
Update report attached at Appendix 1. 
Legal 
4.3 The legal implications are outlined in the Ardrossan Campus Project Update report
attached at Appendix 1. 
Equality/Socio-economic 
4.4 The equality/social-economic implications are outlined in the Ardrossan Campus
Project Update report attached at Appendix 1. 
Climate Change and Carbon 
4.5 The climate change and carbon implications are outlined in the Ardrossan Campus
Project Update report attached at Appendix 1. 
Key Priorities 
4.6 The key priorities are outlined in the Ardrossan Campus Project Update report
attached at Appendix 1. 
Community Wealth Building 
4.7 Any community wealth building implications are outlined in the Ardrossan Campus
Project Update report attached at Appendix 1. 
Islands Communities Impact Assessment (ICIA) 
4.8 Any ICIA implications are outlined in the Ardrossan Campus Project Update report
attached at Appendix 1. 
85

Page 86

United Nations Rights of the Child (UNCRC)
4.9 Any UNCRC implications are outlined in the Ardrossan Campus Project Update report
attached at Appendix 1.
Consumer Duty
4.10 Any consumer duty implications are outlined in the Ardrossan Campus Project Update
report attached at Appendix 1.
5. Consultation
5.1 None concerning this report.
Craig Hatton
Chief Executive
For further information please contact Shannon Wilson, Committee Services Officer, on
shannonwilson@north-ayrshire.gov.uk.
Background Papers
N/A
86

Page 87

NORTH AYRSHIRE COUNCIL
2 June 2026
Cabinet
Title: Ardrossan Campus – Project Update
Purpose: To provide Cabinet with an update on the current progress of
the Ardrossan Campus project, including current projections in
relation to costs and programme.
Recommendation: Cabinet is asked to:
1. Note the content of this report, including the current progress
of work on site.
2. Note the revised project completion date of 26 May 2028,
with anticipated occupation from August 2028.
3. Note the additional estimated cost of £9.97 million (8.74%)
associated with addressing the contamination will be met
from approved capital flexibility funding.
1. Executive Summary
1.1 The Ardrossan Coastal Quarter programme represents a transformational vision for
the area which includes the provision of new housing and commercial uses, providing
ambitious transformational regeneration of a vacant and derelict site on land within
one of North Ayrshire’s most deprived communities. A key component of this vision is
a new educational and community campus. 
1.2 The contract to construct the new Ardrossan Campus Project commenced on site in
July 2025, with the first stage focusing on the excavation of foundations and the
swimming pool tank. In September 2025, asbestos and hydrocarbon contamination
was identified during construction. Appropriate Safe Systems of Work were then
implemented by the main contractor (Morgan Sindall), with an independent review
confirming these measures to be proportionate and compliant.
1.3 The contractual and programme implications were subsequently assessed by our cost
consultant, resulting in an additional cost of £9.97 million (8.74%) and an extension of
the completion date to 26 May 2028.
1.4 The overall Campus project budget will therefore increase to £124,558,600, with the
additional funding to be met from the Council’s capital flexibility fund approved in
February 2026.
Appendix 1
87

Page 88

1.5 An independent external review of the enabling works has been commissioned, with
an initial assessment received and currently under consideration. 
1.6 The safe systems of work which have been required since encountering the
contamination have now ceased. Works are progressing unhindered by these
additional measures and the project has now reached a significant milestone on the
construction process as steel work is now rapidly being erected on-site. 
1.7 Stakeholder engagement will now be undertaken to communicate the revised delivery
arrangements and support appropriate mitigation of the impacts arising from the
extended programme. 
2. Background 
2.1 Two separate contracts relating to the delivery of the Ardrossan Coastal Quarter
were undertaken commencing in June 2023 and January 2024 respectively. The
purpose of these projects was to deliver a new revetment (Sea-Wall) coastal
defence, an extension of the coastal path, remediate contamination and to install
site-wide infrastructure to enable future development. 
2.2 Remediation strategy involved treating contaminated soil on location, removing
hydrocarbons, and reusing suitable treated material in the works. The strategy also
included installing 600mm stone cap across the site to provide a protective barrier as
all contamination would not be removed. The remediation was independently
monitored and verified to ensure it met all required standards. 
2.3 Subsequent to that, construction work on the new Ardrossan Campus commenced in
July 2025, with initial works focusing on the formation of foundations and excavation
of the swimming pool. 
2.4 As works progressed on site, an in accordance with the agreed methodology for
progressing the works, testing of excavated materials continued in order to ensure
all health and safety standards were maintained. In September 2025, asbestos and
hydrocarbon contamination was identified as a result of that testing. Appropriate
Safe Systems of Work were immediately implemented by the main contractor
(Morgan Sindall), with an independent review confirming these measures to be
proportionate and compliant
Programme Development
2.5 The Ardrossan Coastal Quarter site was selected in 2018-2019 as the preferred
location for the new Campus, reflecting its capacity, regeneration potential, and
alignment with the Council’s Local Development Plan priorities. The wider vision
includes residential and commercial development to support regeneration and align
with the Local Development Plan.
2.6 The “Ardrossan North Shore Development Framework”, prepared by external
consultants (Stallan Brand), was approved in April 2021 and set the strategic context
for redevelopment. Subsequently, In June 2021, the Council agreed remediation and
88

Page 89

site infrastructure works to achieve economies of scale and improve the site’s
attractiveness for future investment. 
2.7 In the prevailing market conditions, a single contract for the complete programme of
work was not considered the most deliverable option, and the chosen approach
provided a practical route to securing progress. Market feedback indicated that
including the Campus within those packages would have been less attractive to
bidders. This was reaffirmed when the subsequent Campus tender process only
attracted two bids.
2.8 Following market engagement on the enabling works tender issued in November
2021, the procurement approach was refined in response to no compliant bids being
received through the original process, with the works restructured into two packages
and successfully retendered in 2023 and 2024. 
2.9 Due to the phasing of the separate projects, the enabling works were more
advanced than the Campus design, and the revetment had to be completed first. In
the context of a volatile market, maintaining separate elements of delivery helped
support programme progress and provided a more manageable basis for pricing. 
2.10 It should be noted that the enabling works, as separate contracts with different
contractors, were not the first stage of the construction contract to deliver the
Campus. These were discrete pieces of work, intended to enable development
across the wider Ardrossan Coastal Quarter site. Although the advance enabling and
remediation works provided an appropriate and proactive route to delivery, the use
of three separate contracts meant that interface risks were recorded and remained
an inherent feature of the overall programme.
2.11 The Campus design was successfully finalised while the advance works were
progressing, with the projects coordinated to support overall delivery. Although the
advance works project was not intended to deliver Campus construction works, this
approach helped maintain progress, while market feedback confirmed that separate
contractual responsibilities remained the more practical route. 
2.12 Recognising the challenges being experienced in delivering the wider programme of
works, with a focus on ensuring the Campus could be delivered as soon as possible,
a review was conducted with the support of external consultants (Ironside Farrar) in
February 2024. This confirmed the inherent risks of brownfield remediation, buried
structures, coastal conditions and sequential working, with further contamination
assessed at that stage as an amber risk.
2.13 As Morgan Sindall had no control over the enabling works contract, it confirmed prior
to Financial Close that it would not accept contamination risk within the Campus
contract, the contract therefore acknowledged this risk and relied on the contingency
allocation to address any arising issues. 
2.14 A report was submitted to Council on 26 June 25, confirming the revised budget and
programme for the project. A number of key remaining risks were also highlighted in
the report. Included within those was the potential to discover contaminated material
89

Page 90

in the deep excavations below the remediated level, and the impact this could have
on costs and programme.
2.15 To estimate the potential cost, prior to entering the construction contract the
assessment associated with this risk estimated that around 13,280m³ of excavation
would extend below the 3.5m remediation depth. Utilising market rates for disposal,
a potential worst case disposal exposure of £6.64m was assessed. Because overlap
between known contamination and deep excavations appeared limited, an overall £5
million contingency was considered realistic and included within the project budget.
2.16 The Scottish Futures Trust (SFT) have worked in partnership with the Council
throughout the development phases of the project, including providing financial
support thought the Scottish Government’s Learning Estate Investment Programme.
The project allocation was increased to reflect the challenging conditions around the
delivery of the project. 
2.17 Verification reports in respect of the enabling works contract were received,
satisfying the Planning Conditions required to allow works to commence on site.
Campus Construction Phase
2.18 In September 2025, asbestos and hydrocarbon contamination was encountered
during deep excavations. Elected Members and the local community were
proactively informed shortly thereafter. 
2.19 As a result of this, and to ensure works could progress in a safe manner, Morgan
Sindall introduced Safe Systems of Work, including exclusion zones and specialist
controls.
2.20 An external specialist engineering advisor independently reviewed the Safe Systems
of Work on the Council’s behalf and found them to be both proportionate and
compliant.
2.21 Our cost consultants, Atkins Realis, have assessed the contractual impact of the
appropriate treatment of the contaminants via the safe system of work as an
additional £9.97 million. The programme impact has also resulted in an extension of
time to the contract to 26 May 2028. This has been formally confirmed through the
contractual change control process. 
2.22 This figure represents a significant betterment than the original proposal by the
contractor following robust review and challenge by the Campus project team and
external advisors. 
2.23 Addressing the contamination issue will result in the Campus project budget rising to
£124,558,600. This increase will be addressed through the Council’s capital flexibility
fund approved by Council in February 2026.
2.24 A report by independent specialist engineers has been commissioned, with input
from the appropriate consultant teams, to ensure the reasons for the current issues
are properly understood. An initial assessment has been provided and is being
reviewed to determine the next steps. 
90

Page 91

2.25 Separate delivery of the enabling works and the Campus has also required ongoing
management of wider interface risks; however, these matters are being actively
managed through cross-service coordination to ensure that appropriate mitigation
measures are identified and allocated. 
2.26 Under the NEC4 contract, the Council’s exposure to additional cost arising from
systemic supply chain issues arising from the current conflict in the Middle East is
limited, with broader liability arising mainly where contract terms or future legislative
changes require it.
2.27 As the cost and programme implications arising from encountering contamination are
now understood, the overall construction programme has been updated, and the
Project Team will undertake stakeholder engagement to advise on the new
timetable. This engagement will include: elected members; the school community;
neighbours and the Ardrossan community; and Scottish Futures Trust. 
2.28 The negative impacts of the delay will be most keenly felt by the by the school
community being unable to access the new facility when planned and the
neighbouring properties experiencing direct disruption caused by construction
activities. 
2.29 Stakeholder engagement will recognise these negative impacts, and the project team
will continue to explore practical mitigations to the issues posed by the extended
programme. 
2.30 With the safe systems of work around contamination removal now being complete,
works are progressing unhindered by these additional measures and the project has
now reached a significant milestone on the construction process as steel work is now
rapidly being erected on-site and concrete floor slabs are being poured. 
3. Proposals 
3.1 It is proposed that Cabinet:
• Notes the content of this report, including the current progress of works on site.
• Notes the revised completion date of 26 May 2028, with anticipated occupation from
August 2028. 
• Notes the additional estimated cost of £9.97 million (8.74%) associated with
addressing the contamination will be met from approved capital flexibility and
borrowing. 
4. Implications/Socio-economic Duty 
Financial 
4.1 An additional £9.97 million (8.74%) has been identified as necessary to address the
contamination issues associated with Compensation Events relating to the
contamination as outlined in this report. This requirement will be met through the
approved capital flexibility budget agreed by Council on 25 February 2026. 
91

Page 92

It is anticipated that additional contingency funding may be required to address any
remaining risks which arise during the remainder of the construction period. 
In parallel, a further review of the Council’s Capital Investment Programme will be
undertaken covering the period 2026/27 to 2033/34, to ensure that the revised
programme remains prudent, affordable and sustainable. This review will include long-
term projections of borrowing and interest rate assumptions, assessment of
expenditure profiles, capital receipt forecasts, anticipated capital grant funding, and
the planned use of the loans fund reserve.
Scottish Futures Trust has been approached to explore whether any additional
support may be available. However, the Scottish Government has confirmed, that in
accordance with the agreed LEIP funding principles, the inflationary risk associated
with project delays rests with the local authority.
Human Resources
4.2 None
Legal
4.3 Legal Services will be asked to comment on the report noted at item 2.24.
Equality/Socio-economic
4.4 The construction of the new Campus, as a key component of the wider
transformational regeneration of the Ardrossan Coastal Quarter will have significant
direct and wider socio-economic benefits.
Climate Change and Carbon
4.5 Ardrossan Campus has been designed to be highly energy-efficient and to meet the
LEIP in-use energy requirements of between 67-83KWh/m²/annum. The contract
design shows a predicted attainment of 71KWh/m²/annum. A sustainability
responsibility matrix has been developed and incorporated into the contractual
agreement to deliver facilities that will contribute to the Council’s climate change
priorities.
Key Priorities 
4.6 The project supports the following Council priorities:
Wellbeing
• Developing appropriate skills for the local and regional economy
• Using our assets to support wellbeing in local communities Improving educational
attainment and achievement and closing the attainment gap
• Developing the young workforce and ensuring positive destinations for school
leavers
• Providing lifelong learning opportunities for individuals and organisations including
digital literacy
92

Page 93

• Improving outcomes for care-experienced young people including implementation
of The Promise
• Ensure our places and spaces where we live, work and visit are well maintained
and accessible.
• Support KA Leisure’s leadership of North Ayrshire’s Health and Wellbeing Alliance
• Through the Health and Social Care Partnership Strategic Plan we will protect and
provide care and support for those in need.
Communities and Local Democracy
• Developing partnerships with the third and voluntary sector
• Placemaking, including creation of locality action plans.
• Accessible public services, both digitally and locally.
Climate Change
• Embedding our net-zero ambition in all democratic decision-making.
• Reducing the carbon footprint of our estate and taking a fabric first and low carbon
energy generation approach to homes and buildings
• Promoting new woodland creation and protecting our green spaces to provide a
natural resource for carbon sequestration.
Community Wealth Building
4.7 A suite of community benefits has been developed through the design and
construction phases of the project. The commitments from Morgan Sindall which are
defined in the SCAPE framework agreement have been incorporated into the
contractual requirements for the project.
Islands Communities Impact Assessment (ICIA)
4.8 None
United Nations Rights of the Child (UNCRC)
4.9 The development of the Campus fully supports these rights.
Consumer Duty
4.10 The project will deliver on these through the Stakeholder Reference Group and Client
Planning workstreams.
5. Consultation
5.1 Consultation has been undertaken with Education, Economic Development Growth &
Regeneration, and Finance.
RUSSELL McCUTCHEON
Executive Director (Place)
For further information please contact Laurence Cree, Head of Service Sustainability,
Transport & Corporate Property, on 01292 324514. 
93

Page 94

Background Papers
0 
94