Agenda Document Pack - Audit and Scrutiny Committee - 20/11/2025

North Ayrshire Council · 20 November 2025
Back to Audit and Scrutiny Committee — 20 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 20 November 2025 at 10:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of (a) the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 28 August 2025 and (b) the Minutes of the Special
Meeting of the Audit and Scrutiny Committee held on 23 September 2025
will be confirmed and the Minutes signed in accordance with Paragraph 7
(1) of Schedule 7 of the Local Government (Scotland) Act 1973 (copy
enclosed).
3 Audit and Scrutiny Committee Self-Evaluation 2025
Submit report by the Head of Democratic Services to report on the
outcome of the annual self-evaluation of the Audit & Scrutiny Committee
(copy enclosed).
4 Corporate Fraud Team Mid-Year Update
Submit report by the Head of Finance to provide an update on the work of
the Corporate Fraud Team between April and September 2025 (copy
enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
5 Internal Audit and Corporate Fraud Action Plans : Quarter 2 Update
Submit report by the Head of Finance to advise on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 September 2025 (copy enclosed).
6 Internal Audit Plan 2025/26 : Mid-Year Update
Submit report by the Head of Finance to advise on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 September 2025 (copy enclosed).
7 Strategic Risk Register 2025/26 : Mid-year Update
Submit report by the Head of Finance to provide an update on the
progress with actions related to the Strategic Risk Register (copy
enclosed).
8 IJB Annual Report 2024/25 and Audit Plan 2025/26
Submit report by the Head of Finance to inform of the IJB’s annual report
for 2024/25 and the approved internal audit plan for 2025/26 (copy
enclosed).
9 Internal Audit Reports Issued
Submit report by the Head of Finance to inform the Committee of the
findings of Internal Audit work completed since August 2025 (copy
enclosed).
10 Standing Item of Business: Consideration of future business for
scrutiny
11 Urgent Items
Any other items which the Chair considers to be urgent.
Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following
item of business on the grounds indicated in terms of Paragraph 1 of Part
1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
12 Internal Audit Reports Issued
Submit report by the Head of Finance to inform the Committee of the
findings of Internal Audit work completed since August 2025.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee Sederunt
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney
Chair:
Apologies:
Attending:
4

Page 5

Audit and Scrutiny Committee
28 August 2025 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 2.00
p.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Eleanor Collier, Cameron Inglis and Donald L. Reid. 
Present (Remote Participation)
Davina McTiernan 
In Attendance (Physical Participation)
R. McCutcheon, Executive Director (Place); M. Boyd, Head of Service, J. McCallum,
Senior Manager (Audit, Fraud, Safety and Risk) (Finance); F. Walker, Head of
Service (People and ICT); R. Leith, Head of Service (Connected Communities); A.
McClelland, Head of Service (Education); E. Currie, Principal Manager (Finance)
(Health and Social Care Partnership); Raymond Lynch, Senior Manager (Legal
Services), C. Cheung, Digital, Media and Marketing Analyst (Communications) and
H. Young, Senior Committee Services Officer (Democratic Services) (Corporate
Services). 
Chair
Councillor Bell in the Chair. 
Apologies
Tom Marshall and John Sweeney. 
Due to a technical issue with the remote meeting platform, Councillor McTiernan was
unable to participate in meeting. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The accuracy of the Minutes of (a) the Meeting of the Audit and Scrutiny Committee
held on 29 May 2025 and (b) the Special Meeting of the Audit and Scrutiny
Committee held on 19 June 2025 will be confirmed and the Minutes signed in
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973. 
3. 2024/25 Elected Member Requests Report 
Submitted report by the Head of Democratic Services informing of the Council's
performance relating to Elected Member requests handled in Financial Year
2024/25. 
Agenda Item 2
5

Page 6

Officers responded to Members’ questions and the Committee agreed to note the
report and the information provided. 
4. 2024/25 Complaint Report 
Submitted report by the Head of Democratic Services informing of the Council's
complaint performance and volumes and trends of complaints received in Financial
Year 2024/25. The North Ayrshire Council Annual Complaint Report 2024 to 2025
was attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Committee agreed to note the
report and the information provided. 
5. Elected Member Development 
Submitted report by the Head of Democratic Services providing information and
seeking views on the development sessions provided to Elected Members over the
12 months from September 2024 to August 2025, and on future planned
development sessions. 
Officers responded to Members’ questions and the Committee noted the report and
provided feedback (a) on the Elected Member Development sessions held in the
period September 2024 to August 2025; (b) on means to support Elected Member
attendance; (c) on how future programmes might be improved; (d) the future
development sessions scheduled to date; and (e) to suggest additional topics for
the next year. 
6. Accounts Commission’s Briefing: Local Government Budgets 2025/26 
Submitted report by the Head of Finance informing of the key messages identified
within the recently published briefing. The Local Government Budgets 2025/26 was
attached at Appendix 1 to the report. 
Officers responded to Members’ questions and the Committee noted (a) the key
messages within the recent Accounts Commission briefing; and (b) the current
position of North Ayrshire Council in relation to the key messages. 
7. Internal Audits Reports Issued 
Submitted report by the Head of Finance informing of the findings of Internal Audit
work completed since May 2025. 
Officers responded to Members’ questions and the Committee noted the outcomes
from the Internal Audit work completed. 
8. Internal Audit and Corporate Fraud Action Plans: Quarter 1 Update 
Submitted report by the Head of Finance advising on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 30 June 2025. 
Agenda Item 2
6

Page 7

Officers responded to Members’ questions and the Committee agreed to (a) note the
current position with the implementation of Internal Audit and Corporate Fraud
actions; and (b) challenge those Services that have not implemented actions within
the previously agreed timescales. 
9. Urgent Items 
There were no urgent items. 
Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland) Act1973, to
exclude from the Meeting the press and the public for the following item of business
on the grounds indicated in terms of Paragraph 1 of Part1 of Schedule 7A of the Act. 
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information contained
within the following report is confidential information within the meaning of Section
50A of the 1973 Act and shall not be disclosed to any person by any Member or
Officer. 
10. Investigation Reports Issued 
Submitted report by the Head of Finance informing of investigation reports finalised
since the last meeting. 
Officers responded to Members’ questions and the Committee agreed to (a) note the
outcomes from the investigations carried out. 
The meeting ended at 11:25 a.m. 
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home
Agenda Item 2
7

Page 8

Audit and Scrutiny Committee
23 September 2025 
At a Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
at 10.00 a.m. within the Council Chambers, Irvine. 
Present
John Bell, Eleanor Collier, Davina McTiernan, Donald L. Reid and John Sweeney. 
In Attendance 
D. Hammond, Executive Director; Y. Baulk, Head of Housing and Public Protection;
and K. Henderson, Team Manager (Business Planning) (Housing and Public
Protection) (Communities and Housing); M. Boyd, Head of Finance, D. Forbes,
Senior Manager (Strategic Business Partner); and N. Graham, Team Manager
(Financial Management and Revenues) (Finance); F. Walker, Head of People and
ICT; R. Lynch, Senior Manager (Legal), S. Wilson, Committee Services Officer, and
M. Sugden, Communications Officer (Media and Internal Communications)
(Democratic Services) (Corporate Services). 
Also in Attendance 
F.M. Knight and D. Jamieson, Audit Scotland. 
Chair
Councillor Bell in the Chair. 
Apologies
Tom Marshall 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors 
2. Annual Assurance Statement to the Scottish Housing Regulator 2024/25 
Submitted report by the Executive Director (Communities and Housing) advising of
the Council’s Annual Return on the Charter 2024/25 submission and seeking
approval for its submission to the Scottish Housing Regulator. The North Ayrshire
Council Annual Assurance Statement 2024/25 (unsigned), Supporting evidence
document 2024/25 and Data corrections spreadsheet - North Ayrshire Council -
2023/24 were attached at Appendices 1-3, respectively, to the report. 
Officers responded to Members’ questions and the Committee agreed to (a) note (i)
the Annual Return on the Charter submission 2024/25, (ii) the supporting evidence
provided to demonstrate compliance with the regulatory framework and relevant
legislation, (iii) the Council’s areas of non- compliance detailed at paragraphs 2.26-
2.30 and (iv) the amendments which have been made to the Annual Return on the
Charter 2023/24 and submitted to the Scottish Housing Regulator; and (b) authorise
the Chair to sign the Annual Assurance Statement 2024/25 attached at Appendix 1
to the report, for submission to the Scottish Housing Regulator.
Agenda Item 2
8

Page 9

3. Our Council Plan Year End Progress Reporting including LGBF Analysis 
Submitted a report by the Head of Democratic Services for consideration and
approval of Our Council Plan Year End Progress Reporting including LGBF Analysis.
The Local Government Benchmarking Framework (LGBF) - Analysis of June 2025
Data Release, the six-monthly Council Plan 2023-28 Progress Update, Year End
2024/25 and the Annual Performance Report 2024/25 were attached at Appendices
1-3, respectively, to the report. 
The Chair requested a further report on the process for gathering data in terms of
young people’s developmental milestones and the Service's action plan to assist
those who are not meeting these milestones be brought to a future meeting of the
Audit and Scrutiny Committee. 
Further information was requested regarding Education performance, whether there
is a link between positive destinations and claimant count, Business Gateway start-
ups performance relative to other local authorities and the relatively low numbers of
people being supported into employment. 
Officers responded to Members’ questions and the Committee agreed to (a) note (i)
progress within the LGBF Report as at June 2025 attached at Appendix 1 to the
report, and (ii) that Cabinet approval related to the content of the report, not the
layout or media used to ensure future flexibility for production of accessible format
reports; and (b) note (i) Our Council Plan Six Monthly Progress Report 1 October to
31 March 2025 attached at Appendix 2 to the report, and (ii) Our Council Plan
Annual Performance Report attached at Appendix 3 to the report. 
4. External Audit Report on the 2024/25 Audit and Best Value Work 
Submitted report by the Head of Finance on the Annual Audit and Best Value report
for 2024/25 and to consider the verbal report by the external auditor. Appendix 1 to
the report included letters of representation to be signed by the Head of Finance as
the responsible officer for North Ayrshire Council. The External Auditor’s report,
which summarised the findings of their audit, was attached as Appendix 2 to the
report. 
Fiona Mitchell-Knight and David Jamieson of Audit Scotland provided a verbal report
on the appendices to the report, including highlighting key aspects in relation to the
findings of their audit, and also responded to Members’ questions in relation to their
report. 
Officers responded to Members’ questions and the Committee agreed to (a) note (i)
the findings of the 2024/25 audit of the financial statements as contained in the
external auditor’s Annual Audit Report at Appendix 2 to the officer’s report, (ii) the
agreed Action Plans as outlined in Appendix 1 to the Report; and (b) approve the
audited Annual Accounts for signature. 
Councillor Bell, Chair, thanked the Head of Finance and his team, along with the
external audit team, for all their hard work and diligence in terms of this year’s audit
process.
Agenda Item 2
9

Page 10

The meeting ended at 10.50 a.m. 
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home
Agenda Item 2
10

Page 11

NORTH AYRSHIRE COUNCIL
20 November 2025 
Audit and Scrutiny Committee 
Title:  Audit and Scrutiny Committee Self-Evaluation 2025
Purpose: To report on the outcome of the annual self-evaluation of the
Audit and Scrutiny Committee. 
Recommendation: That the Committee (a) notes the findings of the self-evaluation,
as set out at Appendix 1; and (b) agrees to repeat the self-
evaluation exercise on an annual basis. 
1. Executive Summary 
1.1 The Audit and Scrutiny Committee’s self-assessment process for the financial
year 24/25 which was undertaken on 29th October 2025. 
1.2 The findings of the self-evaluation are set out at Appendix 1. 
2. Background 
2.1 Self-evaluation assessment forms part of the standard operating procedures of the
Audit & Scrutiny Committee. 
2.2 The current evaluation form is based on the CIPFA publication “Audit Committees:
Practical Guidance for Local Authorities and Police – 2022 Edition”, with the
evaluation carried out with specific reference to Appendix E “Self Assessment of
Good Practice”. The checklist was added to, in order to ensure coverage of the
scrutiny element as this relates to the remit of the Audit and Scrutiny Committee.
Prior to the next self-evaluation exercise, the evaluation form will be further reviewed
to remove elements of duplication and will be further informed by best practice. 
2.3 The self-evaluation toolkit set out at Appendix 1 comprises 52 questions covering all
aspects of the committee’s work under the broad headings of:
• Audit Committee Purpose and Governance
• Functions of the Committee
• Membership and Support
• Effectiveness of the Committee
Agenda Item 3
11

Page 12

2.4 Members of the Audit and Scrutiny Committee were invited to consider the self-
evaluation questions independently in the first instance, before coming together for a
discussion session, facilitated by the Head of Service (Democratic) on 29th October
2025.
2.5 Appendix 1 to the report sets out the outcome of the discussion sessions, in terms of
collating consensus responses to the toolkit questions. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the findings of the self-evaluation, as set
out at Appendix 1; and (b) agrees to repeat the self-evaluation exercise on an annual
basis. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Sustainable Council.  The self-evaluation process ensures review of the operation of the
main scrutiny committee within the Council for assurance that there are robust
arrangements in place for ensuring proper governance and risk management. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
Agenda Item 3
12

Page 13

United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 All Members of the Audit and Scrutiny Committee were invited to contribute to the self-
evaluation. 
Aileen Craig
Head of Service (Democratic)
For further information please contact Aileen Craig, Head of Service (Democratic), on
01294 324125.
Background Papers
None 
Agenda Item 3
13

Page 14

1 
Audit and Scrutiny Committee Self-Evaluation 2025                                                                                                                       Appendix 1 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions 
Role of Audit & Scrutiny Cttee Members
1. Does the committee have written terms of reference
which are subject to periodic review? 
X  The terms of reference are set out in
the Council’s Scheme of
Administration (SOA), which is
subject to annual review by the
Council. 
2. Is the role and purpose of the committee understood and
accepted across the Council? 
X  The SOA forms part of the Elected
Member induction programme for
new Members. The SOA is published
on the Council’s website
and is accessible to Members,
officers and the public. 
3. Do the committee members clearly understand their
roles and responsibilities? 
X  The SOA forms part of the Elected
Member induction programme.
Members have exhibited a keen
awareness of their role as Committee
Members. 
4. Do committee members bring an independent
mindset to their role? 
X  No party whip has been declared at
any meetings of the committee and
its members are able to bring
an independent mindset to their role. 
5. Does the composition of the committee adequately
reflect the political make-up of the Council? Are the
majority of its members from outwith the
Administration? 
X  The committee comprises 7
Members: 3 from the main Labour
Opposition Group, 2 from the
Conservative Group,1 from the
Reform UK Group, 1 Independent
Member and 2 from the minority SNP
Administration. The latter are not
members of the Cabinet.
The membership reflects the political
make-up of the Council,
with a majority of Members coming
from outwith the Administration. 
Agenda Item 3
14

Page 15

2 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
6. Is the committee’s remit clearly defined in
respect of the following?
• performance
• value for money
• good governance
• assurance
• risk management and internal control
• internal audit
• external audit
• financial reporting
• scrutiny 
X  All of the elements mentioned are
included within the committee’s
terms of reference, as set out in the
Scheme of Administration. 
Skills and Expertise
7. Is an induction programme provided for new committee
members, covering the role of the committee, its terms
of reference and the key risk and issues facing the
Council, as well as specialised areas such as treasury
management?  
X  New Members receive a full induction
programme which includes the remit
of the Audit and Scrutiny Committee.
Additional training is also available on
specific areas such as cyber security.
A number of other relevant topics are
delivered to all Members as part of
the wider training and development
programme.
Further external training through the
Improvement Service is being
considered. 
Agenda Item 3
15

Page 16

3 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
8. Are the ongoing training requirements of committee
members agreed each year according to their specific
needs and developments arising? 
X  Members have the opportunity to
undertake a PPD exercise annually to
identify training and development
needs. There is also scope for
Members to participate in 360-degree
appraisal, as well as
one-to-one feedback. 
The Committee also receives an
annual report on Member training
which reviews past training, consults
on ways to improve and looks for
suggestions for any necessary
training. 
9. Do members feel they can request training if they
consider this would help them in their role? 
X  Members have the opportunity to
undertake a PPD exercise annually to
identify training and development
needs. There is also scope for
Members to participate in 360-degree
appraisal, as well as one-to-one
feedback. In addition, Members can
contact the Monitoring Officer or s95
Officer for any specific assistance they
require. The Committee also receives
an annual report on Member training
which reviews past training, consults
on ways to improve and looks for
suggestions for any necessary
training. 
Agenda Item 3
16

Page 17

4 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
10. Does the Chair have appropriate knowledge and skills?  X  The Chair is the Depute Leader of the
Labour Group and is experienced in
chairing this and other meetings.
Members of the committee agree
that he is knowledgeable and capable
in his role as Chair. 
Behavioural and Operational Aspects
11. Is the number of meetings sufficient to meet the
committee’s role and responsibilities (and not fewer
than three per year)? 
X  Five ordinary meetings a year are
scheduled and there is provision for
Special Meetings to be arranged, as
required to consider call in requests
and to allow more time to consider
performance reporting. Over the
previous year a number of Special
Meetings have been arranged to
consider Call-in requests and
petitions. 
12. Are committee meetings scheduled in good time in
respect of important decisions and financial deadlines?
And are the meetings are held to coincide with key dates
within the financial reporting and audit cycle? Is there
are clear plan for the year to ensure all matters within
the committee’s remit are covered? 
X  The calendar of meetings is agreed
following consultation with officers
and Members, and to accord with key
audit dates. The forward planner of
committee business ensures that
business is scheduled appropriately.
In instances where the volume of
business is likely to be onerous, there
is provision to arrange additional
meetings.
Following an improvement action
identified in 2019, meetings are no
longer scheduled in the same
week as a Council meeting. This
ensures that Members have time to
fully consider the reports before the
Committee. 
Agenda Item 3
17

Page 18

5 
13. Does the Agenda allow for flexibility, or for further
meetings to be held where appropriate, should the
committee need to spend additional time on issues?    
X Yes. See above. 
14. Are meetings of the committee well-
attended, with the majority of committee members
present at each meeting? 
X  Attendance levels since the start of
the current Administration range
from 67-100% 
15. Are all the committee members fully engaged and
participative in meeting discussions? Do members
participate in active discussion and debate around key
agenda items, with appropriate contribution from each
member? Do members ask questions, including ‘tough’
questions?  
X Members of the committee
proactively engage and ask questions
of officers and others attending the
committee, and can ask for further
clarification or reports, as required. All
Members of the Committee are fully
engaged with the remit of the
Committee. 
16. Has each committee member declared their business
interests? Is the register of interests checked on a regular
basis? Is the register easily accessible? 
X  Members have declared their
business interests, which are
published on the Council’s website.
A quarterly reminder to update the
register of interests is issued. 
Agenda Item 3
18

Page 19

6 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
17. Does the committee have good working relations with
key people and organisations, including external audit,
internal audit and the chief financial officer?  
X The committee has a positive and
constructive relationship with
officers of the Council and the
Council’s external auditors. Both
attend committee to present their
reports and are available to meet
with the Chair outwith meetings. This
has been recognised as a strength. 
18. Does the committee hold periodic private discussions with
the chief internal auditor and also with the external
auditor? 
X  Discussion with the internal and
external auditors take place. These
discussions tend to be in public, in
the course of committee meetings.
In addition, however, the Chair holds
Pre-Agenda meetings with officers in
private and there is also provision for
the chief internal auditor to meet
with the Chair if required. 
19. Does the committee have clear criteria for assessing its
effectiveness to inform their annual assessment?  
X  The current self-evaluation
process offers an opportunity and
mechanism for the committee to
assess its effectiveness.
Given the level of business before the
Committee in the financial year
24/25 and the positive way in which
all Members were engaging with the
Committee an evaluation was not
undertaken. The exercise will now
take place on an annual basis as was
previous practice with the exception
of the first year of an Administration
where time is required to enable the
Committee to gain experience. 
Agenda Item 3
19

Page 20

7 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions 
Information and Support 
20. Do the clerking arrangements for the committee
ensure that the members’ time is used effectively? For
example:
• is there a good reason for each item being on the
agenda?
• are all papers circulated sufficiently in advance (and
none tabled) and distributed in sufficient time for
members to give them due consideration?
• do the reports prepared for the audit committee
members make it clear what they are being asked to
do/agree? 
X  The draft Agenda is discussed in
detail with the Chair/Vice-Chair at a
Pre-Agenda meeting and the
finalised Agenda then issued at least
three clear days prior to the meeting.
Papers are circulated in advance of
the meeting as part of the Agenda.
The standard report template
includes sections setting out the
proposals and detailed
recommendations. 
21. Does the committee have a mechanism to keep it aware
of topical legal and regulatory issues and institutional
developments, for example, by receiving
circulars, training or briefing papers? Is the
committee briefed on significant changes?  
X  The committee can receive ad hoc
briefings and updates in respect of
topical matters. 
Agenda Item 3
20

Page 21

8 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
22. Do the committee members receive reports that are
comprehensive but concise and tailored to their needs?
Is the information they receive robust and objective? 
X  The volume of business considered
can be extensive. However, the
format of reporting keeps the reports
as concise as possible, with key points
highlighted and further information
provided via appendices/links to
external material/reference to
background papers. The provision of
electronic Agendas (with Search
functionality) has assisted in ensuring
that Members have the salient
information and as well as access to
further reading.
The appendices to some performance
reports are, by necessity, lengthy,
although the covering report does
identify key messages and highlights. 
23. Are Minutes taken and appropriately circulated to all
committee members in a timely manner, with actions
arising noted and their resolution tracked? 
X  Minutes include the purpose of the
report, the committee’s decision and
how it is to be implemented.
Committee Services publish the
Minute within five working days of
the meeting and Members receive an
electronic link to the Minute. The
recorded meeting is also available on
the website for reference which
contains the full detail of the
discussion rather than simply a
minute.
Committee Services issue action
notes to officers responsible for
implementation as well as reminders
about outstanding actions. A
summary of overdue actions is also
sent periodically to Executive
Directors and Heads of Service. 
Agenda Item 3
21

Page 22

9 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions 
Activities and Functions:
Performance
24. Does the committee receive regular detailed reports on
the performance of services? 
X  Council Plan progress reports are
submitted annually and detailed
reports on Service performance
are considered twice yearly. 
25. Is the committee involved in setting the strategy for
performance review? 
X  The committee does review 
performance, but it is the Council as a
whole which takes responsibility for
setting the strategy via the Council
Plan.
Any concerns may, however, be
raised via the committee. 
Activities and Functions:
Governance
26. Does the committee provide support to the Council in
meeting the requirements of good governance? 
X  The committee receives an annual
Governance Statement prepared by
the Senior  Manager (Internal Audit,
Risk and Fraud) and is able to
question/challenge its contents. The
Code of Corporate Governance
prepared by the Head of Democratic
Services is also prepared on an annual
basis. Ad hoc advice is provided to the
Committee if required at the meeting
by the relevant officers. 
27. Does the committee oversee an assessment of the
governance arrangements of the Council and advise on
their effectiveness? 
X  See above. 
28. Does the committee consider reports and
recommendations from external audit and
regulators/agencies as appropriate and their
implications for governance, risk management and
control? 
X  The committee does receive regular
reports from the internal and external
audit functions and wider regulatory
and inspection agencies. 
Agenda Item 3
22

Page 23

10 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
29. Does the committee monitor arrangements for
ensuring value for money and for managing
exposure to the risk of fraud and corruption? 
X  The committee receives regular
reports on managing fraud and
corruption, including an annual
corporate fraud report, quarterly
updates on corporate fraud action
reports and regular reports on the
outcome of investigations by
Internal Audit and the Corporate
Fraud team. 
30. Does the committee scrutinise and challenge the
finance committee (Cabinet) effectively? 
X  The committee does hold the Cabinet
to account, including via the call-in
process. The committee has
considered a number of call-in
requests in the past year. The
Committee has in previous years
recommended to Cabinet,  on
occasion, that it reconsiders its
decision.   
Agenda Item 3
23

Page 24

11 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
31. Is the committee’s role in relation to whistle blowing
clear? Does the committee review the arrangements by
which staff may, in confidence, raise concerns about
possible improprieties in matters of financial reporting or
other matters? 
X  The Council has a whistle-blowing
policy and updated March 2023
version is available online at
northayrshirecouncil.sharepoint.com
/sites/EmployeeConduct/Shared
Documents/Forms/AllItems.aspx?id=
%2Fsites%2FEmployeeConduct%2FS
hared Documents%2FWhistleblowing
Policy %26
Procedure%2Epdf&parent=%2Fsites
%2FEmployeeConduct%2FShared
Documents
The committee, therefore, has
assurance that the processes are in
place. 
32. Is the committee’s role in relation to the Council’s
fraud and corruption procedures clear? 
X  The committee receives regular
reports on corporate fraud
investigations undertaken by the
Council’s internal audit function. It
also receives a quarterly update on the
implementation of actions identified
as a result of investigations
undertaken and is invited to
challenge Services which have not
implemented
actions within the agreed timescales. 
Activities and Functions:
Assurance
33. Does the committee seek to ensure that assurance is
planned and delivered? 
X  The Senior Manager (Internal Audit,
Risk and Fraud) prepares an Annual
Governance Statement which is
included within the annual accounts
and explains how the
Council complies with the Code of
Governance Framework. 
Agenda Item 3
24

Page 25

12 
34. Does the committee understand what assurance is
available to support the annual governance statement? 
X  The Council’s internal audit service 
carry out specific audits on the Code
of Corporate Governance every 3-4
years and the outcome is reported to
the committee.
Also the wider programme of Internal
Audit work, as defined in the Annual
Audit Plan, all feeds into the
assurance available to support the
AGS, as well as some other sources of
assurance, most notably the work of
External Audit.  The output from
Internal and External Audit’s work
(i.e. audit reports) are presented to
the committee at the next available
meeting after publication 
35. Does the committee seek clarity regarding what
assurance is required? 
X  Yes.   
36. Does the committee gain assurance that the Council’s
risk management, control and governance
arrangements are adequate and effective? 
X  Yes. See above. 
Activities and Functions: Risk
Management
37. Does the committee keep risk management on its
agenda throughout the year?  
X  The committee receives an annual
report on Strategic Risk Register
together with a Mid-Year report.
These are standard agenda items for
the consideration of the committee. 
38. Does the committee monitor how the Council
assesses risk? Does it review the
Council’s risk register on a regular basis? 
X  The Cabinet approves the
Council’s Risk  Management
Strategy. However, the committee
does receive an annual report on 
the Risk Register and is able to
question/challenge its contents.
The committee receives reports on
specific areas of risk, including cyber
security. 
Agenda Item 3
25

Page 26

13 
39. Is the nature, source, format and frequency of
information on risk management and internal control
submitted to the committee fit for purpose? 
X  Yes. See above. 
40. Is the committee aware of the Council’s cyber risk
activity? Does it receive regular updates on
management and mitigation of cyber risk? Has it
received appropriate training to meet its
responsibilities? 
X  Updates on Cyber Security are
provided. 
Members have also received
specific briefings on cyber
security.
It is proposed that further ongoing IT
Security Training and briefings are
provided to Elected Members. 
Activities and Functions:
Internal Audit
41. Does the committee monitor and review the
effectiveness of internal audit? 
X  The committee receives an annual
audit report, together with reports
on the outcome of audits and is,
therefore, able to question the work
of the team. The Chair also meets
with the Senior Manager (Internal
Audit, Risk and Fraud) out with the
formal meeting at pre-agenda
meetings or ad hoc as required. 
42. Does the committee approve, annually and in detail, the
internal audit strategic and annual plans? Does it
ensure that the internal audit plan is aligned to the key
risks of the business? 
X  The committee approves the Internal
Audit plan and agrees the indicators
and targets set out in the report. 
43. Does the committee consider the actions management have
taken to implement the recommendations of
internal audit? Are follow up audits by internal audit
monitored by the committee? 
X  Yes. These are the subject of
quarterly reports. 
44. Does the committee receive regular progress reports from
the internal audit service summarising internal audit
activity? 
X  The committee receives regular
reports on internal audit reports
issued. These include the key findings
of audits undertaken and
the management response.
There is also a mid-year update on
progress delivering the Annual Audit
Plan and the Annual Report reviewing
the year’s work. 
Agenda Item 3
26

Page 27

14 
45. Is the internal audit plan sufficiently flexible and dynamic
to help identify and address new risks and
promptly meet the emerging needs of the audit
committee? 
X  The indicative programme of work is
reviewed each year and
may change to reflect the priorities at
that time.
The plan always has a contingency of
time set aside for flexibility such as
emerging risks.  Proposed changes to
the plan may be brought to the
Committee at the mid-year update.   
46. How does the committee ensure that a professional
relationship is maintained between internal and
external audit? 
X  The Chair can meet separately with
internal and external audit
representatives. 
47. Does the committee review the adequacy of internal
audit staffing and other resources? 
X  The committee receives information
on audit staffing as part of the audit
plan and the audit annual report. 
48. Does the committee, in conjunction with the internal
audit service and management, have a role in
establishing and maintaining appropriate performance
indicators to measure the work of the
internal audit service? 
X  The annual audit plan which is
reported to committee includes
performance indicators. 
Activities and Functions: External
Audit
49. Are follow up audits by external audit monitored by the
committee? 
X  The Committee receives progress
reports on action plans arising
from external audit. 
50. Does the committee consider the adequacy of
implementation of external audit recommendations? 
X  The external auditors include in their
current report information on the
action which has been undertaken by
the Council to implement
recommendations from the previous
audit and this is duly presented to the
committee. Additional meetings with
the external auditor can be arranged
as required. 
51. Do the external auditors present their audit plans and
strategy to the committee for review? 
X  The committee receives an annual
report on the External Audit plan. 
52. Does the committee assess the performance of
external audit? 
X  External auditors attend the
committee to present their reports
and are, therefore, open to
questions and challenge. 
Agenda Item 3
27

Page 28

15 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
53. Is the committee clear regarding its role in the rare
event of external audit qualifying the Council’s financial
statements? 
X  If the Council’s accounts were
qualified, the committee would
require a further report and would
undertake a review of areas qualified
to ensure adequate improvement
actions had been put
in place. 
Activities and Functions: Financial
Reporting
54. Does the committee monitor the integrity of financial
statements and announcements and review significant
financial reporting judgements? 
X  In addition to the reports initiated by
officers, the committee may also raise
any other significant
matters. 
55. Does the committee review the financial statements,
external auditor’s opinion and reports to members, and
monitor management action in response to the issues
raised by external audit? 
X  This information is presented to
committee for consideration. 
56. Does the committee consider significant accounting
policies and any changes to them? Does it at least
annually assess whether the Council has adopted
appropriate accounting policies? 
X  The committee approves Accounting
Policies annually. 
57. Does the committee consider whether the financial
statements satisfy all statutory and regulatory
requirements to which the Council is subject? 
X  The external auditors annual report
provides assurance on the financial
statement’s compliance with all
statutory and
regulatory requirements.
The committee is guided by the
professional advice of the officers
presenting these reports and is able
to question/scrutinise as
appropriate. 
Agenda Item 3
28

Page 29

16 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions 
Activities and Function:
Scrutiny
58. Does the committee consider key matters of their own
initiative rather than relying solely on the work of the
internal/external auditor or responding to call-in
requests? 
X  There is a standing agenda item to
enable Members to raise matters of
their own volition for consideration
at future meetings. The Committee
has initiated over the period a
number of requests for reports to
scrutinise aspects of Council
business.  Over the financial year
24/25 the following reports were
brought to the Committee at its own
instigation:
• the Community Asset
Transfer process 
• the Council’s Climate
Change target and
associated policies
• statistical data in respect of
staffing levels and costs of
the Council, by Department,
over the last 3 years.
• the nature of housing
tenancies and fraud.
• To receive a report on
supplier and quality issues
of purple bin lids and the
replacement process. 
Agenda Item 3
29

Page 30

17 
Area for focus? Performing as
Expected?
Special Strength? Evidence for assessment Improvement Actions
59. Does the committee agree an annual programme of
scrutiny and review activity? 
X  A number of standing reports are
timetabled to the Audit & Scrutiny
Committee as a matter of practice
e.g. Complaints Report, Council Plan
update and performance reports. 
The standing agenda item for other
areas for scrutiny enables Members
to bring forward any pertinent
matters they wish to have addressed. 
60. Does the committee have sufficient resources to
undertake investigations or review work? 
X  The committee has received an
assurance that the necessary
resources would be made available to
it in order to conduct reviews. 
Review
61. Does the committee assess its performance and
effectiveness on a regular basis? Do members assess
how they could carry out their business more effectively,
e.g. timetabling of business? 
X  The committee conduct self-
evaluation work See previous
comment. 
62. Are there KPIs in place against which committee
members can assess their performance? 
X  The committee does not consider
that KPIs are necessary given that the
external auditor’s interim and final
reports, internal audit reports
and best value reports provide
necessary assurance. 
Agenda Item 3
30

Page 31

18 
Area for
focus?
Performing as
Expected?
Special
Strength? Evidence for assessment Improvement Actions
63. Has the committee evaluated whether and how it is
adding value to the Council? 
X  The committee has not sought to
evaluate the value it adds to the
Council. It is not clear how such an
evaluation might be undertaken. 
64. Does the committee produce an annual report and
have an action plan to improve any areas of
weakness? 
X  The committee does not produce an
annual report or action plan.
Members consider that to do so
would represent duplication, in that
its Minutes set out all of the business
which has been transacted and this
information is placed in the public
domain. 
65. Has the committee obtained feedback on its
performance from those interacting with the committee
or relying on its work? 
X  The committee has not formally
sought feedback on its performance.
Members feel it would be difficult to
establish  who would  be  surveyed 
and  how the outcome might be
usefully interpreted. For instance, a
petitioner attending a meeting of the
Audit and Scrutiny Committee to
speak to their petition, or an Elected
Member attending to present a call-in
request, might be satisfied with the
committee’s work if they achieve
their desired outcome, but this in
itself will not necessarily be an
effective gauge of the committee’s
effectiveness. 
Agenda Item 3
31

Page 32

Agenda Item 3
32

Page 33

NORTH AYRSHIRE COUNCIL 
20 November 2025 
Audit and Scrutiny Committee 
Title:    Corporate Fraud Team: Mid-year Update 
Purpose:  To provide the Audit and Scrutiny Committee with an update
report on the work of the Corporate Fraud Team between April
and September 2025. 
Recommendation:  That the Committee notes the work carried out by the Corporate
Fraud Team. 
1. Executive Summary 
1.1 The Corporate Fraud Team provides the Council with the capacity to investigate fraud
both within and against the organisation. 
1.2 Committee receives bi-annual updates on the work of the team. This report provides an
overview of the activity of the team between April and September 2025. 
2. Background 
Referrals 
2.1 Referrals for investigation have been made to the team from a number of different
sources, including Revenues and Benefits and Housing, members of the public and other
agencies and local authorities. The publicity used by the team, including posters and
leaflets, advertising on Council vans and contact information on the Council website,
continues to be successful in generating a stream of referrals. 
2.2 Investigations have been carried out across a range of areas including employee- related
matters as well as Council Tax, Discretionary Housing Payments, Scottish Welfare Fund,
Blue Badges and Housing tenancy issues. Although responsibility for investigating
Housing Benefit fraud now lies with the DWP Single Fraud Investigation Service (SFIS),
issues may be identified by the Corporate Fraud Team which can result in changes being
made to benefits in payment. Joint working arrangements are in place with the DWP for
cases where there are suspected frauds relating to both DWP benefits and Council Tax
Reduction. 
2.3 The team investigates all tenancy abandonments which are referred by Housing. While
Housing focus on recovering the tenancy, the Corporate Fraud Team can add value by
locating the missing tenant, which can often lead to changes to benefits or discounts in
payment elsewhere, as well as enabling Housing to recover costs associated with house
clearances and cleaning. 
Agenda Item 4
33

Page 34

2.4 Employee-related investigations are the subject of a separate report to the appropriate
Service and the findings are also reported to the Audit and Scrutiny Committee as each
investigation is finalised. 
Financial outcomes for April to September 2025 
2.5  The team received 165 referrals for investigation during the first half of 2025/26 (2024/25:
162 referrals). Analysis of these referrals shows that 119 referrals were received from
internal sources (e.g. internal & external colleagues, or a by-product from another case)
and 46 from external sources (i.e. members of the public). 
2.6 The team investigates 100% of referrals made. During the period, 155 cases were closed
(2024/25: 191 cases). These can be categorised as follows: 
Category Number of Cases
Closed with no issues identified 78
Referred to another agency (including SFIS) or Council
Service for investigation
30
Closed with results achieved (fraud, error or other
recovery/action)
47
TOTAL 155 
2.7 Of the 155 referrals received, almost half of these (76) related to tenancy cases, with 69
cases of suspected abandonment, 1 relating to tenancy succession with 6 other housing
related cases (including 3 referrals from the Private Sector Housing Team). 
2.8 Fraud and error totalling £0.036m were identified and are categorised in the table below:  
Category Value (£000)
Council Tax (including CTR, Single Person Discount
and other recoveries)
6.5
Business Rates (including the recovery of arrears) 27
Other (including employee investigations) 2.5
TOTAL 36 
Non-financial outcomes for April to September 2025 
2.9 In addition to the financial outcomes noted above, other outcomes/benefits were noted as
follows: 
• 23 tenancies were recovered by Housing with some assistance from the Corporate
Fraud Team.
• 8 blue badges were recovered and a further 4 warning letters were issued for blue
badge misuse. 2 blue badge cases were reported to the Procurator Fiscal for
prosecution. One badge was cancelled which was no longer required. 8 verbal warnings
were also issued, where appropriate.
• One employee investigation has been undertaken by the Corporate Fraud Team which
resulted in a report with actions.  This also included conduct / disciplinary issues.
• 9 corrections and updates to records have been made to ensure record keeping is up
to date. 
Agenda Item 4
34

Page 35

International Fraud Awareness Week 
2.10 International Fraud Awareness Week (IFAW) takes place from 16 – 22 November 2025.
This year awareness will be through the promotion and sharing of fraud related social
media posts, from across the UK public sector. 
National Fraud Initiative (NFI) 
2.11 The NFI is a long-established exercise which takes place across the UK every two years
and involves the matching of relevant datasets across public bodies to identify possible
fraud or error for further investigation. 
2.12 The Corporate Fraud Team coordinates the exercise for the Council and the 2024/25
National Exercise is now underway. Data sets for the exercise were submitted to the
Cabinet Office in the Autumn of 2024 and matches have been released at various points
since December 2024 and throughout early 2025.   
2.13 The matches received thus far have been passed out to services for review and this is
progressing well.  Services have until March 2026 to complete their review of these
matches, and the Corporate Fraud Team will continue to monitor progress throughout the
exercise. 
2.14 Data was uploaded as part of the non-mandatory ReCheck exercise in January of 2025,
with matches being released back almost instantly.  The review of these matches is in
progress. 
2.15 Adult Social Care data has been the subject of a legislative reform order and will now be
extracted from Council Systems at the end of October 2025 and uploaded to the Cabinet
Office, which will generate a further match release. 
2.16 Progress updates will be provided at future Audit and Scrutiny Committee meetings, with
the final outcomes expected to be reported by Audit Scotland in Summer 2026. 
3. Proposals 
3.1 It is proposed that the Committee notes the work carried out by the Corporate Fraud Team. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Agenda Item 4
35

Page 36

Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of the Corporate Fraud Team helps to support the efficient delivery of the
strategic priorities within the Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 No consultation has been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Karen Gray, Team Manager (Corporate Fraud), on
01294 324594. 
Background Papers
None.
Agenda Item 4
36

Page 37

1 
NORTH AYRSHIRE COUNCIL 
20 November 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit and Corporate Fraud Action Plans:
Quarter 2 Update 
Purpose:  To advise the Audit and Scrutiny Committee on the
progress made by Council Services in implementing the
agreed actions from Internal Audit and Corporate Fraud
reports as at 30 September 2025. 
Recommendation:  That the Committee notes the current position with the
implementation of Internal Audit and Corporate Fraud
actions. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in
Scotland' highlights that Audit Committees should monitor and review the
progress made in implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from
Internal Audit and Corporate Fraud reviews are implemented. This provides
assurance that identified control weaknesses have been addressed and are
being managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action. This enables
Internal Audit to monitor progress on a 'real-time' basis and address any delays
in implementation. 
1.4 This report details the position as at 30 September 2025. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 28 August 2025
highlighted that there were 14 actions outstanding at the end of June 2025 and
all but one actions had not yet passed their due date. 
2.2 In addition to these 14 carried forward actions, there have been 19 new actions
agreed, giving a total of 33 action points for review. 
2.3 Services have completed 26 actions since the last report. All Council Services
are required to retain evidence of work carried out in completing their actions
Agenda Item 5
37

Page 38

2
and Internal Audit carries out 'spot-checks' on a sample of completed actions
on an ongoing basis. 
2.4 Of the remaining 7 actions, 3 were only partially completed as at 30 September
2025 and the remaining 4 actions were not due for completion until after that
date. 
2.5 Appendix 1 to this report provides the Committee with full details of the 3
actions that were not completed within the agreed timescales. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and (b) challenges
those Services that have not implemented actions within the previously agreed
timescales. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud
actions helps to support the efficient delivery of the strategic priorities within the
Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
Agenda Item 5
38

Page 39

3
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and
Corporate Fraud review and have also provided updates on progress made in
implementing action points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Anne-Marie Fenton, Interim Senior Manager
(Internal Audit), on afenton@north-ayrshire.gov.uk. 
Background Papers
None.  
Agenda Item 5
39

Page 40

4
Appendix 1 - Actions due by 30 September 2025 but not started or partially completed
Code IA2025PA005b Description
Action Description:
Management should investigate the feasibility of streamlining the end-to-end process
as part of the transition to Eclipse to minimise the number of instances where data
input is required, where possible.
In the meantime, management should ensure that the access database (DB) is
restricted to a limited number of authorised users only and that the DB is suitably
protected (e.g. by way of strong password) until such time as the new system has
been implemented.  
Finding:
The admin team currently update the budget monitoring spreadsheet, an operational
access database and the CareFirst system at each stage of the process for all
Council tenant jobs.  All serve a different purpose. This is very time consuming for
staff and increases the risk of keying errors being made.  In addition, the access
database is not supported by IT Services.  
Risk:
Inefficient use of staff time and increased risk of keying errors.
Priority 2 Latest Note
Current trial of reporting via Eclipse with a view to eliminating the need for the Access
Database from process.  Target date for removal of Access Database 30th November
2025. 
This action will streamline and remove the requirement for admin duplicate
information across platforms.  The spreadsheet and Eclipse data input will remain.
Progress Bar  Original Due Date 30-Sep-2025 Due Date 30-Sep-2025
Parent Code & Title IA2025PA005 Aids and Adaptations
Managed By
Head of Service (Housing &
Public Protection); AHP
Senior Manager &
Professional Lead 
Assigned To Team Manager (Housing);
Team Manager OT  
Agenda Item 5
40

Page 41

5
Code IA2025PA010a Description
Audit Action: The revised Terms of Reference should be presented to the
Transformation Board for approval. 
Audit Finding: It was noted that the Terms of Reference stated that action notes
from the Board meetings would be shared at each IJB via the Director’s report, but
this has not been done in practice, at the request of the IJB. However, the IJB have
received 6-monthly updates on the progress of the Transformation Plan. The Senior
Manager (Strategic Planning and Transformation) prepared a revised Terms of
Reference to reflect the reporting arrangements to be presented to the
Transformation Board in July 2025. 
Risk: The arrangements for reporting the progress against the Transformation Plan
to the IJB are not compliant with the Terms of Reference of the Transformation
Board.  
Priority 3 Latest Note
The next meeting of the Transformation Board is scheduled to take place on the 5th
December 2025 (3pm). The Terms of Reference will be addressed at this meeting
due to the scheduled meeting for the 22nd of October 2025 being cancelled. 
Progress Bar  Original Due Date 20-Aug-2025 Due Date 20-Aug-2025
Parent Code & Title IA2025PA010 IJB Transformation Managed By Director of Health & Social
Care
Assigned To Chief Social Work Officer  
Agenda Item 5
41

Page 42

6
Code IA2025SI003a Description
Action description: Review the SHR guidance and audit recommendations to
ensure Data Dictionaries are fully completed and issued to appropriate staff prior to
24/25 SHR ARC return being completed. This will ensure consistency in data
collection from year to year. Data Dictionaries should also make reference to what
evidence is required to be kept, which format is used to present it and where this
should be centrally filed. 
Audit finding: No formal internal procedure notes are in place to ensure that
Regulator guidance is followed and updated as required for the period tested -
23/24. Incomplete Data Dictionaries have been provided and are intended for use
for 24/25, however there are currently in draft form. It was also noted that some staff
responsible for collating the data for the ARC were not aware of the Data
Dictionaries. 
Risk: Inaccurate reporting to ARC as required by SHR, due to inconsistent data
collection. Lack of consistency reduces comparability of PIs and therefore
usefulness for management decision-making. Lack of clear instructions for new staff
if those who currently prepare the PIs are unavailable in the future.  
Priority 1 Latest Note
Work has taken place on the ARC indicators to gather the data on a monthly basis. 
The Business Improvement Team are currently working on the new reports which
will form part of the data dictionaries.  This will allow teams to understand where the
data is being pulled from and the inclusions, exclusions set out by the Scottish
Housing Regulator. 
Work will be done to complete a 6 month return, which will enable the data
dictionaries to be completed.  The work will be completed by the 31st October 2025.
Progress Bar  Original Due Date 30-Sep-2025 Due Date 30-Sep-2025
Parent Code & Title IA2025SI003 Housing Indicators
Managed By Head of Service (Housing
& Public Protection);
Assigned To Team Manager
(Performance) 
Agenda Item 5
42

Page 43

NORTH AYRSHIRE COUNCIL 
20 November 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit Plan 25/26: Mid-year Update 
Purpose:  To provide an update on progress made in delivering the
2025/26 Internal Audit Plan. 
Recommendation:  That the Committee notes the current position with the
2025/26 internal audit plan and approves the inclusion of eight
additional audit reviews in 2025/26. 
1. Executive Summary 
1.1 The current Internal Audit Plan for 2025/26 was approved by the Audit and Scrutiny
Committee in March 2025.  The plan sets out the areas of work which Internal Audit
intends to cover during the year. 
1.2 The Global Internal Audit Standards (GIAS) recognise that it is good practice to regularly
review and adjust the plan, as necessary, in response to changes in the organisation’s
business, risks, operations, programmes, systems and controls. 
1.3 Additions to the internal audit plan have been agreed in consultation with Chief Officers
across the Council’s directorates for 2025/26 and these are detailed within the report at
Appendix B. 
1.4 Appendix C outlines the audits listed within the rolling plan which will be drawn from
during the year, if resource capacity allows. 
2. Background  
2.1 Appendix A to this report is the approved audit plan for 2025/26. For each audit
additional information has been provided to show the actual activity to 30 September
2025. 
2.2 In line with good practice, the plan should be reviewed during the year in light of
experience gained from audit work carried out, emerging risks to the Council and the
changing environment in which audit work is carried out. 
2.3 Using a risk-based approach and in consultation with Chief Officers in each of the Council’s
directorates, eight additions to the audit plan, for completion during Q3 & Q4, are noted in
Appendix B. These have been selected from the rolling long list of audits that were
presented to the committee in March 2025. An updated copy of the rolling long list of audits
is in included at Appendix C and future audits will be drawn down from this where capacity
allows. 
Agenda Item 6
43

Page 44

2.4 Any further material updates to the Audit Plan will be brought to the committee for
consideration as the financial year progresses. 
3. Proposals 
3.1 It is proposed that the Committee notes the current position of the 2025/26 internal audit
plan, as specified in Appendix A and approves the inclusion of the eight additional audit
reviews noted in Appendix B in 2025/26. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within the Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
Agenda Item 6
44

Page 45

5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. Services have also been consulted on the proposed changes to the
internal audit plan. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Anne-Marie Fenton, Interim Senior Manager (Internal
Audit) on afenton@north-ayrshire.gov.uk . 
Background Papers
None.  
Agenda Item 6
45

Page 46

Internal Audit Plan 2025/26 Quarters 1 & 2 Appendix A 
Audit Area to Deliver in Plan Directorate /
Service
Planned
Quarter
Priority Link to Council Plan Link to Risk Registers Progress to Date
HSCP - Overtime Controls HSCP Q1 B
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
Operational Risk Complete
CT / NDR Refunds Finance/
People & ICT Q1 B
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
N/A Fieldwork Ongoing
School Funds Education Q1 B N/A N/A Fieldwork Ongoing
ICT - Asset Management People & ICT Q1 A Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people Strategic Risk To Start
Buildings and Estate
Maintenance Place Q1 B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people Operational Risk To Start
Social Care Establishments HSCP Q2 A Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people Strategic Risk To Start
Capital Monitoring Finance Q2 B
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
Corporate Risk Fieldwork Ongoing
Accounts Payable Transactions People & ICT Q2 A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities 
N/A Fieldwork Complete
ELC Payments to Partner
Nurseries Education Q2 B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people N/A To Start
Absence Management Corporate Q2 A Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing
and resilience for local people Operational Risk To Start
Tenants & Residents
Associations
Communities
& Housing Ongoing D Communities and Local Democracy – we will have active, inclusive and resilient
communities N/A Complete
Consultancy - Grant Compliance Place Ongoing B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk Ad Hoc 
Agenda Item 6
46

Page 47

Additions to the Internal Audit Plan 2025/26 for Quarters 3 & 4 Appendix B 
Audit Area to Deliver in Plan Directorate/Service Planned
Quarter
Priority Link to Council Plan Link to Risk Registers
Grants Compliance Communities & Housing Q4 B Communities and Local Democracy – we will have active, inclusive and
resilient communities Operational Risk
School Inventory Management Education Q4 B
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
N/A
HSCP - Business Continuity
Planning HSCP Q4 B Wellbeing – to transition to a wellbeing economy, delivering prosperity,
wellbeing and resilience for local people
Corporate Risk and Operational
Risk
Payroll Transaction Testing People & ICT Q3 A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
N/A
Neighbourhood Services -
Overtime Controls Place Q4 B
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
Operational Risk
Ayrshire Growth Deal Place Q4 A Wellbeing – to transition to a wellbeing economy, delivering prosperity,
wellbeing and resilience for local people Operational Risk
IJB Financial Sustainability IJB Q3 A
A Sustainable Council – a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources towards our
priorities
Strategic Risk
ICT Incident Detection People & ICT Q4 A N/A Strategic Risk 
Agenda Item 6
47

Page 48

Rolling Internal Audit Plan Appendix C 
These reviews will form part of the rolling plan for future audits. The plan will continue to be adjusted as the year progresses to reflect current organisational risks and issues. Ongoing risk assessments will be
undertaken to determine the priority areas to include in the plan. 
Potential Future Audit Areas Directorate/Service Priority Link to Council Plan Link to Risk Registers
Corporate - Performance All B All N/A
Corporate - Business Continuity
Planning All C A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Corporate Risk and Operational Risk
Stores Controls Communities &
Housing C A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Community Associations Communities &
Housing B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk
ARC Compliance Testing Communities &
Housing / Place B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Operational Risk
Advisory - Equalities Democratic B N/A Strategic Risk
Freedom of Information Democratic A A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Corporate Risk and Operational Risk
Residential Placements Education B Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk
Child Poverty Policy Education C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Education - Handling of Medication Education C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
General Ledger Finance D N/A N/A
Community Based Support - Young
People HSCP B Communities and Local Democracy – we will have active, inclusive and resilient
communities Operational Risk
Financial Assessments - non-
residential HSCP C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people N/A
Care Home Sustainability HSCP B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities Strategic Risk
Review of HSCP Charging Policy HSCP C A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Agency Staff & Workers (IR35) People & ICT B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Payroll – Non-standard payments /
allowances People & ICT B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Fuel Controls Place B A Sustainable Council – a Community Wealth Building Council that is efficient and
accessible, maximising investment and focusing resources towards our priorities N/A
Flood Programme Place C Climate Change – achieving net-zero by 2030 Strategic Risk and Operational Risk
Advisory - Decriminalised Parking
Arrangements Place C N/A N/A
Shared Prosperity Fund Place C Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people Operational Risk 
Agenda Item 6
48

Page 49

NORTH AYRSHIRE COUNCIL 
20 November 2025 
Audit and Scrutiny Committee 
Title:    Strategic Risk Register 2025/26: Mid-year Update 
Purpose:  To provide the Audit and Scrutiny Committee with an update on
the progress with actions related to the Strategic Risk Register. 
Recommendation:  That the Committee notes the mid-year update on the 2025/26
Strategic Risk Register. 
1. Executive Summary 
1.1 The Council’s most significant risks are identified through the Strategic Risk Register, which
is refreshed annually and was last approved by Cabinet in March 2025. 
1.2 This report, together with Appendix 1, demonstrates progress made by the Council in
mitigating against the potential impact of the strategic risks. 
2. Background 
2.1 The Council’s most significant risks are identified through the Strategic Risk Register,
recognising the challenges facing the Council within the current financial year and
demonstrating the arrangements in place for managing those risks. 
2.2 The Strategic Risk Register is refreshed annually and was last approved by Cabinet in
March 2025; thereafter it was reported to the Audit and Scrutiny Committee in May as this
Committee has a remit for monitoring key risks. 
2.3 The register is attached at Appendix 1 and provides an update on that approved by Cabinet
in March. The next full refresh of the risk register will take place early in the new year, to
be taken to Cabinet for approval in March 2026 and thereafter reported to the Audit and
Scrutiny Committee. 
2.4 Where relevant, key actions from the Council Plan have been linked to the risks and
progress shown at the end of September. These actions are more strategic in nature. Some
risks are managed as ‘Business as Usual’, through the appropriate operational plans within
Services or through current controls. 
Very High Risks 
2.6 There are five strategic risks classed as ‘Very High’ (scoring 17-25):
Financial Environment (risk score 20) – this risk reflects the ongoing financial challenge
faced by the Council. 
Agenda Item 7
49

Page 50

Inequalities (risk score 20) – this highlights the socio-economic inequalities faced in North
Ayrshire. 
Financial Sustainability of the Health and Social Care Partnership (risk score 25) –
this reflects the significant ongoing financial challenges faced by the Partnership and the
risk these present to the Council which are increasing. This matter is currently being
addressed by the Council through current financial performance reporting governance and
through the recent Budget setting process for 2025/26 and future years. However it should
be stressed that this position continues to present significant challenges for the financial
sustainability of the Council. 
Property Asset Risk (risk score 20) – This reflects the impact of long-term restricted
budgets on the Council’s ability to maintain these to a good standard. 
Community Capacity Building and Empowerment (risk score 20) – this highlights the
challenges associated with delivering the Community Empowerment Act. 
High Risks 
2.7 There are three strategic risks classed as ‘High’ (scoring 10-16):
Cyber Security (risk score 16) – this reflects the ongoing risk from external cyber-
attack which is being faced by all organisations.
Climate Change (risk score 16) – this risk has been on the Strategic Risk Register
following the declaration by the Council of a Climate Change Emergency during 2019. 
Transformation (risk score 12) – this reflects the wider risks associated with delivering
the current Transformation Programme and developing a pipeline of future initiatives. 
Longer-term risks and horizon scanning 
2.8 The Strategic Risk Register identifies the most significant risks which the Council faces at
the present time. 
2.9 The Corporate Risk Management Group identifies any new relevant risks though internal
reviews and external horizon scanning utilising a number of sources. 
3. Proposals 
3.1 It is proposed that the Committee notes the mid-year update on the 2025/26 Strategic Risk
Register. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Council continues to have a robust long and medium-term financial planning
framework. Key strands include development of key transformation themes and the
establishment of an Investment Fund that will generate future savings alongside delivery
of a number of key Council priorities. 
Human Resources 
4.2 None.
Agenda Item 7
50

Page 51

Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The risk to the Council is that North Ayrshire residents, and in particular certain groups, will
experience increasing levels of poverty and its effects. Current control measures fall into
two categories - measures to address the root causes of socio-economic inequalities -
income through employment or benefits – and mitigation measures to minimise the impacts
of poverty. 
Climate Change and Carbon 
4.5 The Council has declared a climate change emergency and has in place an Environmental
Sustainability and Climate Change Strategy. Significant work to help mitigate the risk of
flooding is included within the Capital Plan. The Council is undertaking an ambitious
renewable energy programme. 
Key Priorities 
4.6 A successful risk management framework helps to underpin the delivery of the Council’s
strategic priorities in the Council Plan 2023-2028. 
Community Wealth Building 
4.7 The Council has an ongoing commitment to community empowerment and locality
partnerships, together with an enabling approach with community partners and support
with third sector interface to build capacity and identify opportunities for growth and
sustainability. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Strategic Risk Register has been reviewed in consultation with the Executive
Leadership Team. 
Mark Boyd
Head of Service (Finance) 
Agenda Item 7
51

Page 52

For further information please contact Alex Fitzharris, Team Manager (Risk & Insurance),
on 01294 324415. 
Background Papers
None.  
Agenda Item 7
52

Page 53

Appendix 1 - Strategic Risk Report – Mid Year Update 2025/26 
Risk Code SRR2526_R01 Risk Title Financial Sustainability Latest Note Date 16-Sep-2025
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The risk is that the level of funding from Scottish Government
to local government falls significantly below the level required
to operate services effectively. This will require the Council to
take increasingly difficult and challenging decisions. The
revised 2025/26 local government settlement represents an
increase in core funding of £7.254m (2.05%). This is against a
backdrop of significant inflationary cost increases and risks,
including and anticipated shortfall in funding for employer
national insurance contributions for direct staff of £2.647m. 
The North Ayrshire position is further affected by a reducing
overall population demographic and a growing elderly
population. This will further impact the Council’s share of
funding across the short, medium and long term. 
Although there is a commitment through the Verity House
agreement for Councils and Scottish Government to work
together there continues to be challenges around the level of
flexibility the Council has on key areas of Budget, most notable
in areas like HSCP funding and funding for teachers and
support staff, where conditions remain.  Cost pressures across
the Council’s General Fund and the Health and Social Care
Partnership present a significant risk to the sustainability of the
Council’s finances. 
Scottish Government funding to support the Council’s capital
programme has also not kept pace with rising costs. Set
against high inflationary driven construction costs there is a
risk that the 10-year capital programme will be unaffordable.
This could require projects to be reduced in scale or even
ceased.
Funding not keeping pace with demand
and inflationary cost pressures means that
there will be a reduction in some service
areas potentially resulting in higher risks
for service users. The future delivery of
balanced budgets will become increasingly
challenging. The capital programme could
also be significantly impacted leading to
reduced levels of capital investment.
Robust monitoring of the Council’s revenue and
capital budgets is in place as well as regular
reporting of financial performance of the IJB to
Cabinet and Audit and Scrutiny.
To assist financial planning The Medium and Long-
Term Financial Outlook (LTFO) to 2033/34 was
approved at Council on 13 December 2023 – this is
the cornerstone of the Council's financial planning in
the medium to long term. 
The annual budget process for the General Fund
revenue and Capital Programmes and financial
performance monitoring process will continue to
provide the framework from which control measures
will continue in addressing the financial position. 
Delivery of the Council’s Change Programme is also
vital in addressing the Budget challenges and this is
being progressed by the Council’s Transformation
Board, which is chaired by the Chief Executive. 
Utilising the Council’s available statutory powers is
another important area in addressing the financial
challenges. 
4 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Increasing Risk 20
Agenda Item 7
53

Page 54

Strategic Risk Action Plan Date Updated 16-Sep-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG
Regular financial monitoring of Revenue and Capital Budgets. 
26 February 2025:
Recent finance reports trending towards break-even position for the Council’s
general fund. Major challenges remain however regarding the financial
performance of the IJB. The Council will require to make interim funds
available to the IJB in 2024/25 and this will be on the basis of repayment in
future years. This will be considered by Cabinet. 
16 September 2025:
Early indications for 25/26 position projects a net break-even or even a
trending underspend. This position however does not include the HSCP
position which could have funding implications for the Council. 
31-Mar-2026  Mark Boyd 
Maintain Financial Governance Arrangements for IJB. 
26 February 2025:
The Finance Working group continues to progress transformation and
recovery actions, however it is unlikely it will achieve financial balance in
2024/25. Information continues to be reported through to the Council’s
Cabinet 
31-Mar-2026  Mark Boyd 
Progress dialogue via COSLA with Scottish Government on a range of
areas including fair funding, multi-year settlements, reduction in levels of
ring-fenced resources, true costs of SG policy areas, financial flexibilities
and a New Deal partnership with SG and local government.
26 February 2025:
Further progress made in this area as part of the Local Government
settlement through reduced levels of ring-fencing, however, further progress
needs to be made as conditions remain around teacher numbers and HSCP
funding. Financial flexibilities have been progressed by the Council through
approval of 100% premium for second home-owners council tax and through
a review of non-domestic rates empty property relief
31-Mar-2025 Mark Boyd 
Develop the 2026/27 to 2028/29 revenue budget (medium-term financial
strategy) and capital programme taking account of all pressures and
savings via Directorates and Transformation programme. 
16 September 2025:
The 2026/27 Budget process has commenced. Early budget engagement with
elected members scheduled for 8th October 2025 and the Medium-Term
financial Outlook planned for Council on 5 November 2025. 
26-Feb-2026  Mark Boyd 
Agenda Item 7
54

Page 55

Risk Code SRR2526_R02 Risk Title Inequalities Latest Note Date 12-Sep-2025
Risk Owner Caroline Cameron; Sam Anson; David Hammond
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
North Ayrshire residents, and
in particular certain excluded
groups, will experience
increasing levels of poverty
and its effects, as a result
both of the economic
situation and further public
sector funding challenges.
Health inequality is closely
linked to poverty,
employment and people's
earliest experiences as
children, and will increase. 
The population of North
Ayrshire is projected to fall
over the next 10 years but
there will also be a larger
proportion of the population
considered dependent (not
economically active).
The impact on specific risk
groups is greatest for our
children, young people and
families, unemployed people
and those in in- work poverty
and people exposed to the risks
of drug and alcohol addiction.
Demand for HSCP and Council
Services will increase. 
As reductions in resources
increase, early intervention and
prevention activities are at risk,
thus increasing the potential for
an increase in costly crisis
interventions. 
The local economy will be
impacted by reduced spending
power by economically inactive
residents.
The Collaboration for Health Equity in Scotland (CHES) is an innovative two-year partnership between
Public Health Scotland, the Institute for Health Equity and to improve healthy life expectancy and reduce
health inequalities. The CHES programme was officially launched in Saltcoats Townhall in February 2025.
This work has resulted in establishing three workstreams which will provide an enhanced focus on the
marmot principles below in identified geographic areas: 
Marmot principle 1 – Give every child the best start in life (Irvine Fullarton / Castlepark / Bourtreehill)
Marmot principle 3 – Fair employment and good work (Three Towns, Saltcoats Central / Ardrossan
Central / Stevenston Hayocks)
Marmot principle 6 – Strengthen the role of ill health prevention (Garnock Valley) 
The aims of CHES are to answer two fundamental questions: 
1) What are the most impactful areas for intervention in Scotland to make meaningful progress in closing
inequities in healthy life expectancy, and 
2) how can national and local organisations work more effectively to close the gap between policy intent
and impact in these areas? 
One of the key priorities in the HSCPs current strategic plan is ‘Tackling Inequalities’, and over the
previous year has continued to deliver actions aimed at reducing inequalities. For example, our social
work teams continue to host events during the year at critical times, such as back to school and
Christmas, to get children supplies they need and participation in social events. 
The Money Smart service continues to offer advice and support for financial inclusion, with self-referrals to
the Welfare Reform Advice team doubling between 2023 and 2024. A new financial advice strategy has
been developed this year and once published will outline plans for further support to offer the community.
The team is also engaged in a two-year initiative to implement Welfare Rights services within eleven GP
practices throughout North Ayrshire. Since the project's inception, three Income Advisers have secured
nearly £4 million in benefits for local patients and residents. 
The Justic Service Unpaid Work Teams Employability Mentors work with people with convictions that may
face stigma or inequality associated with declaring a criminal record, or an unwillingness by some
employers to provide those with criminal convictions with job opportunities. The mentors assist service
users involved with the Justice system to obtain skills that will enable them to gain employment and
training opportunities to support reintegration into the community. 
The HSCP is currently revising its Strategic Plan where it aims to move towards focussing on health
improvement and long-term planning to meet the changing needs of the population within more efficient
systems. 
It outlines 3 Strategic Priorities that aim do address some of the causes of poor health and respond to the
inequalities within the population: 
1. Supporting the Improvement of Population Health 
2. Addressing the Changing Needs of an Ageing Population
3. Tackling the Root Causes of Health and Care Inequality 
Over the 3 year period following approval of the new approach, the HSCP aims to research and identify
whether any changes to service delivery could lead to improved health and care outcomes. 
The HSCP also developed new Equality Outcomes in 2025, which aims to reduce inequalities when
accessing health and care services for protected characteristics. A set of aims have been developed which
include improving support for carers with additional barriers, such as ageing carers or those with
disabilities, and improving accessibility for those with cultural or language barriers.
5 4
Agenda Item 7
55

Page 56

Investment in early intervention teams and approaches in Children’s Services to support vulnerable
families, including in Child Protection and Whole Family Support. The Council considers reducing
inequalities to be at the heart of its work. 
The Communities & Housing Directorate leads the Community Planning Partnership for the Council, and
the CPP’s Local Outcomes Improvement Plan has a central purpose of reducing inequalities. Locality
Planning priorities and Community Investment Fund funded initiatives are also focused on a range of
inequalities, including poverty, age-related inequalities and digital inequalities. Recent CIF-funded projects
have focused on employability, addictions and community food. A recent review of locality planning has
refocused activity on addressing inequalities. Communities staff support a range of community led projects
which address poverty within their areas, such as the organisations who are part of the NA Fairer Food
Network. 
Sam Anson, Executive Director (Education) and David Hammond, Executive Director (Communities &
Housing) led the work of the Child Poverty and Cost of Living Board, chaired by the Council Leader. The
five strategic themes of the Board were:
• No Wrong Door – access to services
• Employability
• Food
• Islands
• Childcare 
This work has now been mainstreamed by the Community Planning Partnership (CPP) to ensure greater
partner visibility and impact. The work of the Partnership’s Wellbeing Alliance is also increasingly focused
on the impact of child poverty and how this can be mitigated.
Work to address child poverty and the Cost-of-Living crisis includes a range of employability initiatives to
support parents and people with disabilities, each of whom are Scottish Government priority groups.
Progress has been made with partners to undertake a review of the Child Poverty & Cost of Living
approach, with recommendations being finalised for consideration by the Board. This is supported by the
data and Single Shared Assessment projects being developed by the Transformation team, to provide
holistic support for residents who need it most. 
The Child Poverty Early Intervention Fund is being used to address gaps in current planning and
provision. Previous funding decisions were made as a consequence of the mini-enquiries to support
employability and travel, childcare developments and support for care experienced young people and
families. Further allocations are currently being developed and have been approved by the CPP Senior
Officers Group. 
Through the Scottish Government’s Fairer Futures Partnership we have established a Child Poverty
Strategy Team, who came into post in January 2025. This team are providing a key oversight role in
collectively delivering holistic support, alongside the transition to a wellbeing economy, in reducing child
poverty rates in North Ayrshire. 
The Scottish Government has provided a third year of funding to address inequalities on the islands. This
has been used to fund energy support, welfare advice and support, third sector interventions and school
activities. 
The commitment to reducing inequalities is also reflected in the following plans:
• The Educational Service Improvement Plan
• Connected Communities strategic plans and
• Facilities Management plans. 
Examples of actions to reduce inequalities:
• Deployment of Scottish Attainment Challenge funding to reduce the poverty related attainment
gap in schools
Agenda Item 7
56

Page 57

• Use of the Pupil Equity Fund to ensure equity of pupil experience in schools, at the discretion of
head teachers
• Cost of the School Day actions to reduce, for example, the cost of school uniforms and clothing,
food and outings
• Support for care experienced young people, both in schools and through youth services
• Additional national and local investment in Active Schools to focus on inequalities and equity
• The mainstreaming of community buildings as warm spaces and events to mitigate energy use and
social isolation
• Work to support “New Scots,” in schools, with families and in community settings through language
support and capacity building, including women’s groups
• LGBT support groups for young people and those over 18
• Mentoring support for young people in secondary schools through a partnership with MCR Pathways. 
Work is in hand with the Third Sector Chief Officers Group to co-design expenditure proposals from the
Child Poverty & Early Intervention Fund on three priorities relating to child poverty, namely childcare,
support in employability and financial inclusion. 
Funding for the final proposal of a collaborative approach by third sector organisations was agreed in June
2025 and work is progressing. 
In addition to the above, the HSCP re-affirmed its commitment to tackling Inequalities by continuing to
consider it a key priority with the Partnership’s Strategic Plan.
Through the HSCP strategic plan, the Partnership sets out actions to tackle inequality through its
Partnership Pledge and across its strategic priorities. Tackling inequalities is addressed across HSCP
service areas. An example of actions to help address local inequalities include: 
Establishing the Money Matters service in 9 GP practices and 7 local schools in the more deprived areas
of North Ayrshire. This will improve accessibility of the service to those who would benefit most. Building
on this approach through the launch of the Financial Inclusion Partnership bringing a range of key
partners and stakeholders together to improve access and support for the most vulnerable NA residents. 
Increase the number of employability mentors in Justice Services, to support those with experience
of the justice service into meaningful employment or training opportunities and to help divert away
from criminal behaviours. 
Working closely with Housing colleagues to support transitions from care and ensuring care
experienced young people can access a positive and stable housing destination. 
In our Drug and Alcohol Services, we are implementing actions to reduce the number of local drug and
alcohol related harms and deaths. This includes implementing the national MAT (Medicated Assisted
Treatment) standards and increasing the number of ABIs (Alcohol Brief Interventions) delivered across
North Ayrshire. 
Through the Caring for Ayrshire programme, we have set out a phased approach to improve local primary
care premises (GP Practices and Health Centres). This will improve overall professional capacity within
GP practices for Multi-Disciplinary Teams, ensuring the right support is available for local people with
health concerns. 
Investment in early intervention teams and approaches in Children’s Services to support vulnerable
families, including in Child Protection and Whole Family Support. 
A range of strategies are in place to ensure our strategies and investment are informed by as wide a range
of views as possible. The recent incorporation of the UNCRC has ensured that children and young
people’s right to participate is upheld by all services.
Agenda Item 7
57

Page 58

Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 20
Agenda Item 7
58

Page 59

Strategic Risk Action Plan Date Updated 12-Sep-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG 
Global and national conditions which affect the cost-of-living and poverty continue
to undermine the effectiveness of local control measures. Substantial work
continues to mitigate inequalities but child poverty data, for example, continues to
show an increase. National data collection methodologies have changed which
explains the change in part, but North Ayrshire continues to have c. 29% of
children living in poverty. 
Although unemployment has reduced, it continues to be a driver of poverty, with
in-work poverty a key factor.
Access to benefits is a key driver of poverty and the range of strategies described
above continues to ensure we are maximising access to entitlements. The Single
Shared Assessment work will improve this. 
20 February 2025:
The work of the CPCOL board has been mainstreamed* as a
workstream of the CPP board following discussion with both
groups and in recognition of the importance of the work as a core
function of the partnership. This improves visibility and
governance. 
Work is being developed around the codesigned use of an
allocation of the Child Poverty and Early Intervention Fund along
with the Third Sector Chief Officers Group. This will improve
capacity for change across third sector initiatives delivering on
child poverty outcomes. 
The recent review of Locality Partnerships has resulted in a series
of recommendations designed to refocus the work of the
partnerships on their prime driver of reducing inequality. 
12 September 2025 
The CPP Board continues to focus its strategic activity on CPCOL
and the reduction of inequalities.  Locality planning has a
renewed focus on inequalities within areas and driving forward
change at locality level. 
The Third Sector Chief Officers Group have begun implementing
the project which was collaboratively proposed with a view to
increasing their capacity and tackling child poverty outcomes. 
We are working on the delivery of the action plan around
childcare which is associated with child poverty work. 
We continue to work to build and support capacity in community
and voluntary organisations which mitigate the impacts of poverty. 
Work has begun on the new Active Communities strategy which
will have a focus on reducing health inequalities through
supporting activity across North Ayrshire. 
The Wellbeing Alliance has refined its approach to focus on the
impacts of child poverty over the next three years and will deliver
a range of targeted projects. 
A locality mapping exercise is under way to share information and
gather a full picture of all supports available in each area. 
Continued support for the Fairer Food Network, including the
allocation of additional funding from the CPEIF, ensures
continued access to dignified food provision. 
We are working in collaboration with the Island Plan Delivery
Groups to ensure effective spend of funding to address island
related inequalities. 
31-Mar-2025*  Caroline Cameron 
Agenda Item 7
59

Page 60

Access to support and information around other interventions is
made available through the library service. Agenda Item 7
60

Page 61

Risk Code SRR2526_R03 Risk Title Financial Sustainability of the Health and Social Care Partnership Latest Note Date 11-Sep-2025
Risk Owner Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Resources have not kept pace with the demand for and
cost of social care services.  Financial modelling
suggests significant ongoing challenges across the
medium-term with 2026/27 being particularly challenging
as the superannuation increase will cost £7m approx
and this is prior to considering other pressures. There is
no certainty around future funding against growing
demand, increasing costs and demographic pressures,
with one-year budget settlements remaining in place.
The ongoing work to review the Integration Scheme and
to develop new risk-sharing arrangements between the
Council and Health Board in relation to the acute set
aside and primary care prescribing present a financial
risk to the Partnership and Council. 
Unearmarked reserves are depleted, there is no scope to
absorb in-year variances, with any overspends requiring
additional funding from partners. 
The wider system financial challenges and impact across
the whole system, for example the financial position of
NHS AA and the decisions taken to reduce the Board’s
deficit may have impacts on other parts of the health and
care system. 
The Partnership is projecting an overspend of £5.2m in
2025/26, reduced from the £1.2m if the approved
recovery plan is fully delivered. 
The financial position throughout  2025/26 and into
2026/27 remains challenging for the IJB.
Funding levels could result in
savings being made that are not
in alignment with the strategic
plan. This could impact on the
future demand levels e.g.
reduction in early intervention
and prevention means that
future demand is increased. 
An in-year overspend position
poses a financial risk to the
Council and NHS Board as
funding bodies. 
Funding levels increase the
requirement to transform
services at scale and pace.
The IJB actively monitors the financial position with regular detailed
reporting. Directors of Finance of the Council and Health Board have
oversight, and regular updates are provided to the Council's Cabinet.
There is an integrated approach to managing the totality of NHS and
Council resources delegated to the IJB. A three-year Medium-term
Financial Outlook is updated on a rolling basis each year. 
Previous financial settlements have seen both partners meet the
Scottish Government settlement conditions with any additional
resources passed to the IJB. 
The Partnership has developed a new 3-year Transformation Plan
2024-2027 which will be approved by the IJB in March 2024. 
There is £0.780mof earmarked reserves set aside to support
service change and re-design. This is fully committed and any
slippage at the year-end will be drawn down in-year to support the
financial position. 
Services will continue to work towards implementing the recovery
plan to deliver cost reduction targets while carefully managing the
level of risk. The management actions and governance framework
agreed in 2024/25 will continue throughout 2025/26.  
Additional actions approved for 2025/26:
• Recruitment delay – there will be a recruitment drag with vacancy
scrutiny approved vacancies being held for four weeks before they
are advertised to create more payroll turnover.  This will be for all
vacancies except clinical or registered services vacancies or those
which will incur cover costs.
• High-cost care package group – the remit of this group will be
expanded to include care packages for children with a disability and
all UNPACs placement requests.
• Oversight group for looked after and accommodated children in
residential care – this group meets fortnightly to actively review all
placements 
5 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
Remains at 25  Treat
Increasing risk 25
Agenda Item 7
61

Page 62

Strategic Risk Action Plan Date Updated 11-Sep-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG 
Budget Monitoring - Regular budget monitoring reports to IJB are effective. 
16 January 2025:
The capacity of the NHS finance team to provide up to date
monitoring information has been raised and discussions are
ongoing to ensure accurate and timely information is provided to
the IJB. 
11 September 2025:
A pan Ayrshire reporting template is being developed for all Lead
Partnership services to ensure consistent reporting across the
Ayrshire HSCPs. 
31-Mar-2025  Caroline
Cameron 
Corrective Action – Transformation Board is effective 
16 January 2025:
The transformation board has a themes-based agenda e.g.
children & families, community care & health etc. This has
allowed a stronger focus on each area. Regular updates have
been presented to the IJB on progress. 
11 September 2025:
A recent internal audit report on IJB Transformation reported
substantial assurance with regard to the governance of the
HSCP’s Transformation Plan. It stated ‘The current governance
arrangements include clear reporting lines and involve senior
managers at an appropriate level.  The Transformation Board
meets regularly and has a good overview of the projects,
including access to a tracker which is summarised in a 1-page
dashboard’. 
31-Mar-2025  Caroline
Cameron 
Enhanced Financial Controls 
6 March 2025:
The Finance Working Group has now met 6 times and covered a
range of areas to support increased oversight and scrutiny of the
financial position and transformation programme and to support
detailed budget planning for future years. This has supported
proposals for the 2025/26 budget coming forward before March
2025 for approval and an improved understanding of the scale of
the financial challenge and the difficult decisions required to
manage this.
The Financial Recovery Plan is estimated to deliver £4m of
benefit in-year, with the forecast outturn reported to be £5m, a
reduction from the £6.5m reported in August 2024. Some of the
benefit of the plan has been eroded by unexpected financial
pressures in-year.
11 September 2025
Continued operation of the Finance Working Group.
In preparation for the 2026/27 budget there are meetings
ongoing with every senior manager with their Head of Service,
Chief Officer and Chief Finance Officer to review their budget
and services provided. 
31-Mar-2025 
Caroline
Cameron 
Agenda Item 7
62

Page 63

Sessions with the extended PSMT to outline the financial
landscape. 
National Influence/Escalation 
6 March 2025:
Through the NA Chief Officer, the IJB have raised concerns
nationally with Scottish Government, with Civil Servants and
Politically re the impact of the financial position aligned to
performance, for example the priority of the Delayed Discharge
Mission. Scottish Government plans to publish an NHS Renewal
plan at the end of March 2025 which will describe how the £200m
funding set out as part of the budget will be deployed to improve
performance. As part of this, and through NHS Boards, HSCPs
were requested to submit costed improvement plans. North
Ayrshire HSCP submitted a request for £9.5m of additional
funding of which the majority of funding is for social care, the
HSCP await feedback following submission by all Boards to
Scottish Government. 
Concerns have also been raised nationally by Audit Scotland
through their Finance Bulletin on IJBs published on 6th March and
by Chief Officers as a collective, Chief Officers shared the national
scale of financial challenge with Scottish Government officials and
politicians on 5th March with a request that IJB requests for
funding are prioritised. 
11 September 2025:
Continued representation at the Chief Officers and CFO networks. 
31-Mar-2026  Caroline Cameron 
Agenda Item 7
63

Page 64

Risk Code SRR2526_R04 Risk Title Cyber Security Latest Note Date 18 Sept 25
Risk Owner Fiona Walker
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The potential compromise of business operations or a
data breach orchestrated via either digital channels or
the IT infrastructure. This can include targeting of the
user base. Risk derives from both Council operations
and those of its supply chain.
The increasing importance of delivering services
through digital channels and maximising efficiency
through effective and secure use of technology. This
includes a growing adoption of cloud-based computing
resources which extend processing capabilities, and
associated risks, beyond the Council’s network. 
Hybrid remote and mobile working is now the normal
working practice for over 3,000 staff. Such a distributed
work force increases the complexity of protecting
against cyber and data protection risks.
Failure by Services to adopt and comply with
strategies, policies and procedures may
result in a failure to adequately ensure the
desired levels of cyber-security required to
maintain and protect council systems and
data.
There may be a significant impact on the
authority through the release of personal
and/or sensitive information resulting in a loss
of public confidence and significant financial
loss incurred through fines and service
disruption. 
A successful cyber-attack (malicious external
or internal action) on the Council’s IT
environments could also result in significant
service disruption, loss of income streams
and possible data loss/exposure.
Impacts of a cyber-attack could include
economic (i.e. inability to collect online
payments), societal disruption (i.e. loss of
diaries and client appointments), and
reputational damage (i.e. loss of public
confidence in digital services).
It is recognised that it is not possible for any
organisation to expect to be completely protected
against continually evolving cyber threats. A threat
actor with sufficient motivation, resource and capability
will be able to compromise the most secure system.
The Council takes a sociotechnical approach to
reducing risk by continually developing protective
measures through technical, organisational and
people-focused controls. 
Technical controls are implemented in areas such as
network defences, secure configuration of systems,
user authentication, malware protection, and
vulnerability management. These are based on best
practice and independently tested on an annual basis
to confirm their effectiveness in accordance with
compliance schemes. 
The Council employ a fully managed Security
Operations Centre (SOC) service which provides
advanced monitoring, detection and response
capabilities on a 24 hours a day, 365 days a year
basis. 
The Council maintains a comprehensive set of policies,
standards, guidelines, metrics and reporting
mechanisms as part of its information security
governance structure. A comprehensive training and
awareness programme is delivered to nurture a cyber-
aware workforce and culture.
Recent high profile cyber incidents affecting both the
UK retail and public sectors demonstrate a continued
increase in the sophistication and severity of
cybercrime. However, the bolstering of the Council’s
Cyber Security programme through additional resource,
technology and improved processes alongside wider
efforts in improving the Council’s resilience mean that
the overall risk severity score remains stable. The cyber
security landscape continues to evolve rapidly, and this
position will be routinely monitored and reviewed. 
4 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Stable 16
Agenda Item 7
64

Page 65

Strategic Risk Action Plan Date Updated 18-Sep-25
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Incident Detection and Response – Recent cyber-attacks on public
sector organisations highlight the need for robust incident detection
and response procedures and technologies. The current response
procedures been shown to be effective based on incidents
experienced so far, however detection capabilities will need to be
reviewed and improved. 
15 January 2025:
Following a process of market consultation and vendor engagement, the Council
have recently procured a Managed Security Operations Centre (SOC) service for
an initial period of three years. The project is currently in the implementation
phase, and we anticipate the service being fully operational by the end of February
2025. 
18 September 2025:
The Council’s Managed Security Operations Centre (SOC) service is fully
operational. The deadline for completion of this activity has been achieved.  This
will however remain on the SRR as tuning and refinement are required to ensure
effective detection and response capabilities. 
31-Mar-2025 –
achieved. 
Ongoing 
Fiona Walker 
Training and Awareness
15 January 2025:
The mandatory Cyber Security Essentials E-Learning course remains our training
initiative with the greatest reach. This course has been fully re-written and is now
live for all employees to complete annually.
The mandatory E-Learning course is being supplemented by a range of further
initiatives to include all-staff webinars, awareness raising news posts and other
communications, this approach aims to ensure messaging is kept current and
reflects the rapidly evolving threat landscape.
Phishing simulations continue to be used to validate effectiveness of training and
awareness initiatives. 
18 September 2025:
Cyber Security awareness raising initiatives continue to be delivered. The newly
revamped Cyber Security Essentials iLearn module has been launched and the
effectiveness of this can be seen from the most recent phishing simulation exercise
which demonstrates a continuation of the clear downward trend in terms of staff
interactions alongside an increase in those reporting suspicious messages for
further analysis. 
A phishing specific iLearn module is being scoped for development and those staff
who interact with phishing simulation messages will be required to complete this. 
Targeted engagement with Education is underway to ensure school based staff
have the opportunity to attend Cyber Security awareness raising events and
initiatives. 
Ongoing  Fiona Walker 
Agenda Item 7
65

Page 66

Risk Code SRR2526_R05 Risk Title Transformation Latest Note Date 16-Sep-2025
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact 
There is a risk that transformation and change
activities, which are core to the future delivery
models and long-term financial sustainability of
both the Council and Health and Social Care
Partnership, fail to deliver at the level of scale
and pace required.
Failure to deliver transformational change
will impact on the Council’s financial
sustainability, effectiveness of service
delivery and delivery of the outcomes set
out in the Council Plan 2023-28 and the
Local Outcome Improvement Plan
(LOIP).
Failure to deliver the HSCP
Transformation programmes across the
Partnership, involving North Ayrshire
Council (NAC) and NHS Ayrshire & Arran
(NHSAA) services may lead to the
identified outcomes not being delivered;
resulting in financial instability, reduced
performance, deteriorating patient
outcomes, and reputational damage
within North Ayrshire Health and Social
Care Partnership (NAHSCP). 
Failure to embed cultural transformation
activities may lead to difficulties in
building future workforce capacity and in
ensuring we have an engaged, skilled
and knowledgeable workforce to meet
service demand.
The transformation programme aligns to the Council Plan and is
monitored via the Transformation Board. The Board is chaired by
the Chief Executive. 
Workstreams have been developed across Transport and Travel,
Digital, Land and Property assets, Sustainability, Financial Inclusion
as well as ongoing reviews across Waste Services, ELC, Learning
Resources and Housing.
HSCP have an established Transformation Board to closely monitor
progress with plans, regular updates on programme to the IJB and
regular meetings with the Chief Executive and S95 Officer to review
progress and mitigation plans. Cultural transformation activities
continue to evolve to support the Council’s transformation and
improve effectiveness and capability. This includes sharing learning
and skills, engagement, design experiments and a whole systems
approach to transformation and change. 
Our workforce planning approach utilises a variety of tools and
techniques, such as career development, succession planning,
vacancy management, redeployment and early release schemes to
ensure our workforce requirements for the future, in terms of skills
and capabilities, are planned. Each Head of Service has a workforce
plan, and these are monitored six-monthly with continued HR
support and guidance to ensure service review and redesign of the
workforce is on track. 
3 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 12
Agenda Item 7
66

Page 67

Strategic Risk Action Plan Date Updated 11-Sep-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Existing project level governance and controls remain effective and are
constantly reviewed. 
25 February 2025:
Scoping has commenced to inform the next stages of a further
property transformation workstream, focusing maximising the
benefits that can be derived from the property estate (i.e., capital
receipts, community wealth building, net-zero, etc). 
11 September 2025:
A recent internal audit report on IJB Transformation reported
substantial assurance with regard to the governance of the HSCP’s
Transformation Plan.  It stated ‘The current governance
arrangements include clear reporting lines and involve senior
managers at an appropriate level.  The Transformation Board meets
regularly and has a good overview of the projects, including access
to a tracker which is summarised in a 1-page dashboard’. 
Quarterly 
Mark Boyd / Chief
Executive and
Executive Directors 
Review current governance arrangements and project delivery in view of
land and property workstream to seek optimal delivery aligned to the
council’s net zero ambitions. 
25 February 2025:
Regional Land and Assets workstream being further developed with
NAC as lead organisation. 
Work to deliver the Irvine Locality Workstream, approved by Cabinet
in March 2024, is well progressed with the majority of staff now
occupying Cunninghame House. 
26-Feb-2025 
Mark Boyd / Chief
Executive and
Executive Directors 
Agenda Item 7
67

Page 68

Risk Code SRR2526_R06 Risk Title Climate Change Latest Note Date 11-Sep-2025 
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Climate change is expected to continue and
worsen in the future if no action is taken,
with increases to mean global temperatures,
sea level rises and the increasing frequency
and severity of weather events such as
floods, heatwaves, droughts and storms.
More frequent and intense heavy rainfall
events increase the risk of soil erosion and
flooding.
Rises in mean sea level increases risks of
coastal erosion, flooding, saltwater intrusion
and soil salinisation (risk to agricultural land
and freshwater habitats). 
Severe weather is already affecting public
services across Scotland, with operational,
reputational, financial and legal
consequences.
There is also an ongoing impact of severe
winter weather including snowfall and
freezing temperatures which impact service
delivery and the integrity of our roads open
space and buildings infrastructure. This shift
in weather patterns caused by climate
change is also affecting biodiversity across
Scotland.
Increased frequency of severe weather
conditions and flooding events may lead to
more instances of damage to Council
infrastructure and property, interruptions to
service delivery and increased demands
on services, often with little notice.
Risk to life, transport disruption and
pollution to the local environment, as well
as impact adversely on the local economy
if businesses are unable to operate. 
Council requirement to provide immediate
response and manage the adverse effects
of more frequent and severe weather
emergency situations, including support to
local communities and businesses. 
The Council is required to comply with the
‘Public Bodies Climate Change Duties’
under the Climate Change (Scotland) Act
2009. These duties require the Council to
assess the risks, threats and opportunities
associated with climate change and
identify actions to increase resilience to
climate change.
North Ayrshire Council declared a Climate Emergency in June 2019, committing
to act on climate change and reduce carbon emissions. In January 2020 the
Council approved the target to become net-zero carbon by 2030, for both Council
estate emissions and area-wide emissions.
Following implementation of the Council’s third Environmental Sustainability and
Climate Change Strategy (2021-23), Cabinet approved the new Sustainable North
Ayrshire Strategy (2024-27) in December 2023. This strategy provides a road
map to achieve the net zero carbon emissions by 2030 target. 
There are 5 workstreams within the Sustainable North Ayrshire strategy, namely
Energy, Nature, Transport, Waste and Adaptation. We continue to utilise
Adaptation Scotland’s Capability Framework to ensure North Ayrshire takes a
strong, proactive approach to adapting to climate change. Officers are
participating in the Sustainable Scotland Network’s ‘Adaptation Scotland
Benchmarking Group’ to learn and share best practice with other local authorities. 
Adaptation actions are identified within the Ayrshire Flood Risk Management Plan
(2021), the Ayrshire Local Flood Risk Management Plan (2022), the Ayrshire
Shoreline Management Plan and in the Adaptation Capability Framework.
Flood studies are undertaken to help the Council identify areas that are at risk of
flooding and to appraise options to reduce flood risk to communities and
infrastructure.
In addition, actions to mitigate Climate Change risk are held within strategies such
as the Local Transport and Active Travel Strategy, Local Biodiversity Action Plan,
Vacant and Derelict Land Strategy and Weather and Winter Emergencies Plan.
Asset management plans are in place which are regularly reviewed for our
Roads, Fleet, Housing, Property and Open Spaces.
Furthermore, through the Ayrshire Civil Contingencies Team there are emergency
planning arrangements in place in the event of severe weather and flooding
conditions causing major disruption and damage to the area or to individual
communities within it. 
4 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Stable 16
Agenda Item 7
68

Page 69

Strategic Risk Action Plan Date Updated 11-Sep-2025 
Analysis of Effectiveness of Controls  Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG 
Reducing Carbon Emissions:
North Ayrshire Council declared a Climate Emergency in June
2019, committing to act on climate change and reduce carbon
emissions. In January 2020 the Council approved the target to
become net-zero carbon by 2030, for both Council estate
emissions and area-wide emissions. 
The Council has taken action against climate change since our
first Carbon Management Plan in 2006/07, by working to reduce
emissions associated with Council services, and using the
baseline year of 2005/06 from which to measure progress. 
Since the baseline year of 2005/06, Council estate emissions
have reduced by 67%, from 63,334 tonnes of carbon dioxide
equivalent (tCO2e) to 20,745 tCO2e. Area-wide emissions are
published by BEIS. Current records show total emissions have
reduced across North Ayrshire by 42.6%, from 1,454 kilo-tonnes
of carbon dioxide (ktCO2) in 2005 to 835 ktCO2 in 2019. 
To ensure North Ayrshire Council can develop a leading, cross-
sector and community led approach we established a Climate
Change Steering Group (CCSG) in 2021. The CCSG is chaired
by the Cabinet Member for Green Environment and Economy,
and brings together young people, local businesses and
community organisations from across North Ayrshire. 
Existing controls remain effective and are under review as our
response to climate change develops and we progress towards
achieving net zero by the 2030 target. 
24 February 2025
Business and Sustainability Fund agreed through 2024/25 budget in delivery including
appointment of Programme Manager and development of Islands Net Zero Accelerator
(NZA) and Phase Two Mainland NZA programmes. Islands NZA Programme supported by
£25k funding from Zero Waste Scotland. 
Wider Place strategy updates continue to be provided through Pentana and governed
through the Place Project Board. 
11 September 2025
Following delays in the testing and energisation of the Solar Farms, these will now be
connected to the grid and generating clean electricity (and income to the Council) in the
Autumn of 2025. 
A recent SALIX recycling funding application has secured £184k, to be match funded by the
Council. This will assist us in our on-going work to decarbonise the estate. 
Reporting to ELT of energy use and site-by-site performance across the Council now takes
place. 
A programme of 14 Electric Vehicle Charge point installation is underway. In addition, work
continues in partnership with the Ayrshire Roads Alliance to deliver 307 charge points
across Ayrshire. It is anticipated a contractor will be appointed for this work in Q1 2026. 
31-Mar-2027  Russell
McCutcheon 
Agenda Item 7
69

Page 70

Strategic Risk Action Plan Date Updated 11-Sep-2025 
Analysis of Effectiveness of Controls  Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG 
Flood Risk Management Plan:
Cycle 2 of the Ayrshire Local Flood Risk Management Plan has
been developed and was published on 31st December 2022.
Studies and modelling will be undertaken to identify and prioritise
vulnerable areas where financial damage and risk to life are most
likely. 
There is an ongoing programme of monthly inspections of debris
screens which have been installed to prevent vulnerable culverts
from blocking and causing flooding. CCTV inspections of culverts
are also undertaken to identify blockages and deterioration of
assets that might cause flooding. This has been effective in
reducing flooding, although there are capacity issues h that this
process cannot address. 
The Upper Garnock Valley FPS has been completed and is
currently providing flood protection. 
Ayrshire Shoreline Management Plan:
The Ayrshire Shoreline Management Plan will be replaced with a
Coastal Change Adaptation Plan. The adaptation plan will enable
the Council and other stakeholders to effectively plan our future
actions whilst allowing for flexibility in response to future changes.
It will incorporate recent international and UK advances in
adaptation and shoreline management planning to allow for local
interpretation and involvement. 
24 February 2025:
1. The construction of the Millport Coastal Flood Protection Scheme is complete. The
scheme performed well during Storm Éowyn and no significant reports of coastal flooding
in Millport were received. A pre-tender notification for the Millport Mill Burn Flood
Protection Scheme was issued in January 2025. It is anticipated that the contract will be
awarded in Autumn 2025, that construction will commence in late 2025, and that
completion will be in 2026.
2. The first stage of the Three Towns Flood Study was completed in February 2025 and the
scope has been agreed for the second stage. 
3. The scheduled clearance and repair work continues to be implemented to help reduce
flood impacts to people and property. 
4. Following completion of the coastal management studies for Stevenston & Irvine,
progress is being made to develop local Coastal Change adaptation plans for the study
areas. A site investigation is planned to confirm the presence of contaminated spoil and
how exposed this material could be to future coastal erosion. 
5. Following completion of the Upper Garnock Flood Protection Scheme and an update of
the Lower River Irvine hydraulic model, a consultant has been appointed to update the
relevant parts of the Council’s flood resilience plan, including measures at Cunninghame
House and Marress House. 
11 September 2025: 
No Further update at this time. 
30-Jun-2028  Thomas Reaney 
Agenda Item 7
70

Page 71

Risk Code SRR2526_R07 Risk Title Community Capacity Building and Empowerment Latest Note Date 16-Sep-2025
Risk Owner Rhonda Leith
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Unrealistic timescales for progressing of aspects of
legislation of the Community Empowerment Act
(Scotland) 2015, such as Community Asset
Transfer. 
Potential changes to national legislation and
unintended consequences that impact upon our
local community structures and support. Pressure
to support community capacity building and the
variation of needs within a reducing workforce. 
Duplication of effort across HSCP and Locality
Partnerships to foster community participation and
deliver engagement activities. 
Complying with the complex and resource
intensive consultation legislation in service
redesign. 
Rising energy and utility costs relating to property
management.
Budget savings and pressure on property
maintenance budgets.
Where the risk is not managed effectively the
potential benefits of community capacity building
and empowerment may be lost. 
Widening inequality gap between those
communities where levels of capacity and
engagement with the empowerment agenda are
high and those with less social capital where
interest remains low, which constrains the ability
to influence the planning and delivery service.
Any disconnect between the Council’s
aspirations, community appetite for increasing
ownership of assets and what communities
themselves feel able and prepared to commit to
can result in community assets reverting back to
Council. 
Accelerating asset transfer risks losing services
and facilities and risks the ability to plan, connect
and deliver strategic services.
Over-engagement carries disengagement and
engagement fatigue.
Increased property costs can be a deterrent for
organisations engaging and completing the CAT
process. 
Lack of budget to undertake proactive
maintenance is resulting in NAC buildings falling
into disrepair detracting organisations from
progressing to lease and or ownership of NAC
assets.
Ongoing commitment to community empowerment and
locality partnerships from CPP. 
Six locality partnerships and alignment with HSCP
locality arrangements.
Leadership of the CPP Senior Officers’ Group. 
Enabling approach with community partners and support
with third sector interface to build capacity and identify
opportunities for growth and sustainability. 
Reviewed guidance and processes relating to
community empowerment functions.
Participatory budgeting approach local grants,
commitment to PB with partners and leading practice in
mainstreaming participatory approaches. 
External funding bid help for groups through regular
meetings with third sector, funders and funding officer. 
Joint support for training with Scottish Community
Development Centre. 
Investment from Community Asset Transfer Start Up
Fund, prioritising additional staffing capacity to
support CAT in TACT. 
A collaboration and shared resource approach across
Connected Communities Teams will be taken to ensure
the Service deliver on this priority. 
Community Engagement Network supports staff across
the Council and partners to implement the National
Standards for Community Engagement in their work. 
Careful monitoring of staffing capacity to ensure
legislation is met. Standing item at Senior Manager
Meetings to assess impact
Progress discussions with key stakeholders re
dependencies on the progress and impact of delays. 
5 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Increasing 20
Agenda Item 7
71

Page 72

Strategic Risk Action Plan  16-Sep-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Implementation of Community Empowerment Act:
Existing controls remain effective and are kept under review. 
16 September 2025
6-month progress report completed and scrutinised by CPP Board; annual update
underway. 
31-Mar-2025  Rhonda Leith 
16 September 2025
No further changes – work still continuing as above.  31-Dec-2024  Rhonda Leith 
Staff capacity:
Existing controls remain effective however forthcoming VER
structure changes will result in a reduction of CLD professional
staff and risks further pressures on staff to deliver effectively to
key outcomes. 
20 February 2025:
Ongoing discussions being held with key stakeholders re capacity across Council services
and impact on timescales. 
16 September 2025
Capacity remains a concern. Ongoing monitoring taking place. 
31-Dec-2024  Rhonda Leith 
Duplication of effort:
Clearly defined roles and lean processes are reviewed and
maintained to avoid duplication of effort and minimise time and
resource wastage. The team foster open communication
channels with both staff and key stakeholders. 
16 September 2025
Consideration of admin functions still ongoing.  31-Dec-2024  Rhonda Leith 
Consultation:
Existing controls remain effective. Existing controls remain
effective and hybrid engagement models have been
implemented post covid to encourage and provide greater
access to participation. 
20 February 2025:
An extensive programme of budget engagement took place between 10 October and 25
November 2024 including surveys across six main themes as well as in person and online
focus groups. The approach was designed to support our residents to contribute their
views, make the surveys more accessible and avoid digital exclusion. This has resulted in
4,461 responses and almost 40 community conversations across the six budget themes,
more detailed feedback on proposals and considerable engagement with community
groups across North Ayrshire. The engagement has also enabled our residents to bring
petitions on specific options to the Audit and Scrutiny Committee and Cabinet,
demonstrating a high level of engagement with democracy within our communities 
16 September 2025
Work on the 2026/27 budget engagement exercise is about to commence. Further
consultation on various service design decisions are under way. Joint training with Scottish
Community Development Centre is being planned following the Connected Leadership
programme on Communities and Local Democracy. 
31-Mar-2025  Rhonda Leith 
Agenda Item 7
72

Page 73

Increased property costs and lack of investment in community
assets. 
20 February 2025:
Strategic plan for use of CAT investment funds in place. ELT oversight continues of plan
and spend. Horizon scanning for other potential investment opportunities carried out on an
ongoing basis. 
16 September 2025
Strategic plan continues to be delivered with ELT oversight. Connected Communities and
PMI staff meet regularly to prioritise work. External funding routes are being explored and
maximised on an ongoing basis. 
31-Mar 2025  Rhonda Leith 
Agenda Item 7
73

Page 74

Risk Code SRR2526_R08 Risk Title Property Asset Risk Latest Note Date 11-Sep-2025 
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact 
The long-term impact of restricted budget
availability for investment in the Council’s property
assets means these assets are in declining
condition and have greater long term investment
needs.
Systemic building safety issues have been
evidenced by issues such as national high profile
safety issues, and the presence of RAAC through
the public sector property portfolio. These have
highlighted the substantial increasing burden of
property asset management. 
There have been a number of near misses or
critical failures of aging heating plant and
equipment which the council cannot afford to
replace on a programmed basis. 
Inflationary pressures, and on-going volatility in the
construction & related activities sphere, place
further difficulties in the ability of restricted budgets
to address all priorities. 
Maintenance issues and failure of building
components are increasingly likely to result in
disruption to service delivery. There is also an
increasing risk of health and safety and statutory
compliance obligations not being achieved. 
Property events requiring significant interventions
leading to service disruption, closure of facilities,
decant etc. are in increasing in frequency and
often over-lapping (often coinciding with weather
events).
Property condition information is gathered and recorded
within the Council’s electronic asset management
system, providing a baseline to measure building
element lifecycle replacement requirements across the
corporate estate.
The limited investment available is therefore targeted on
priorities. 
Reactive maintenance, and statutory compliance are
also undertaken corporately by PMI, by appropriately
trained / experienced staff. 
There is an on-going Transformation programme
workstream focusing on property rationalisation as a
means of reducing the financial burden of the estate
through reducing overall area occupied (aligned to
carbon reductions). 
Post Incident reviews and lessons learned exercises
with actions undertaken where feasible to do so. 
Risk based property reviews are underway to examine,
on a property by property basis, where property risks
have the potential to impact service delivery. The
information gathered influences both investment plans
and business continuity plans. This work is on-going in
respect of the school estate and is being rolled-out to
other services’ assets. 
An additional £0.5m has been allocated in the 25/26
budget to the Property Lifecycle Budget to address
condition issues within the corporate estate. 
In addition, £0.5m has been allocated to undertake
energy efficiency measures in the property estate and a
joint Sustainability / PMI working group has been
established to identify and progress relevant investment.
This will be coordinated to ensure optimal benefit for
both energy efficiency and property condition. 
Business Continuity Planning, taking cognisance of the
risks posed by potential building unavailability is also
being strengthened. 
4 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 20
Agenda Item 7
74

Page 75

Strategic Risk Action Plan Date Updated 11-Sep-2025 
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
CC&M team within PMI managing reactive maintenance and
statutory compliance.
Team resources stretched; however, restricted budgets are principal risk. 
21 February 2025:
Although previous vacancies were successfully filled, further staff departure now requires
recruitment process – continuing to stretch resources. 
11 September 2025
Vacancies in the team have now been filled; however, a further post will become available
in October 2025 due to retirement. 
Ongoing  Russell
McCutcheon 
Asset management team within PMI collecting asset condition
information and leading prioritisation of lifecycle investment.
Improved asset management system is being investigated; however, restricted budgets
are principal risk. 
11 September 2025
Scoping for a new asset management system is well advance, and a pressure bid has
been prepared to secure funding to take this forward. 
Ongoing  Russell
McCutcheon 
Property rationalisation programme
Locality based property review work currently underway to increase scale and pace of
implementation. 
21 February 2025:
The programme of accommodation moves flowing from the Irvine Property Review is well
advanced and scoping has commenced for further review of the Council’s estate across all
localities. 
Ongoing  Russell
McCutcheon 
Risk based property review process
Requires up to date property information, including client information and cross service
buy-in to be effective. 
21 February 2025
In addition to the estate review meetings noted above, Business Continuity Planning,
taking cognisance of the risks posed by potential building unavailability is also being
strengthened. 
11 September 2025
Review of the Communities Estate has been undertaken, and on-going quarterly
meetings have also been established, following the same process as established in
respect of Education. 
Ongoing  Russell
McCutcheon 
Agenda Item 7
75

Page 76

Agenda Item 7
76

Page 77

NORTH AYRSHIRE COUNCIL
20 November 2025                                                                                                                                                            
Audit and Scrutiny Committee
Title: IJB Annual Report 2024/25 and Audit Plan 2025/26 
Purpose: To inform the Committee of the IJB’s annual report for 2024/25
and the approved internal audit plan for 2025/26.
Recommendation: That the Committee notes the IJB annual report and approved
internal audit plan.
1. Executive Summary
1.1 Section 21.7 of the North Ayrshire Integration Joint Board’s Financial Regulations states:
“The Integration Joint Board Chief Internal Auditor will submit an annual audit report of
the Internal Audit function to the Chief Officer and the Performance and Audit Committee
indicating the extent of audit cover achieved and providing a summary of audit activity
during the year. As a minimum the annual audit report and Chief Internal Auditor’s
opinion will also be reported to the Audit Committees of the NHS Ayrshire & Arran Board
and North Ayrshire Council”.
1.2 The remit of the IJB’s Performance and Audit Committee (PAC) includes the review of the
overall internal control arrangements of NAIJB. The IJB annual report for 2024/25 and the
proposed internal audit plan for 2025/26 were provided to the PAC on 27 June 2025.
1.3 The annual report and audit plan will also be provided for information to the Audit and
Risk Committee of NHS Ayrshire and Arran on 20 November 2025.
2. Background
Annual Report 2024/25
2.1 The 2024/25 IJB internal audit plan was approved by the PAC in August 2024 and
included a review of the IJB’s Transformation Plan.  The audit has been finalised and
overall, substantial assurance was obtained in relation to the arrangements for monitoring
progress against the Plan and for ensuring that issues are escalated in a timely and
effective manner.
2.2 The opinion on the control environment of the IJB is also influenced by the audit findings
relating to the key systems of North Ayrshire Council and NHS Ayrshire and Arran and by
relevant audit work within service areas that are part of the Health and Social Care
Partnership. The annual report on audit work within North Ayrshire Council was
presented to the Audit and Scrutiny Committee of the Council on 29 May 2025. The
annual report for NHS Ayrshire and Arran was presented to the Audit and Risk
Committee of the NHS on 24 June 2025.
Agenda Item 8
77

Page 78

2.3 Based on the audit work carried out in the IJB and relevant work carried out in the parent
bodies, my opinion is that reasonable assurance can continue to be placed on the
adequacy and effectiveness of the IJB’s systems of governance, risk and internal control. 
Internal Audit Plan 2025/26 
2.4 The internal audit plan for 2025/26 was approved by the PAC on 27 June 2025. The IJB
has its own audit plan which includes 25 days drawn from the Internal Audit service of North
Ayrshire Council – 15 days being utilised to carry out the approved audit assignment for
the year. 
2.5 A further 10 days have been set aside to fulfil the IJB Chief Internal Auditor role; this will
include preparing reports for the IJB, attending meetings and providing training and support
to members of the IJB Performance and Audit Committee. 
2.6 It was agreed that the 15 days will focus on the IJB’s arrangements for ensuring its ongoing
financial sustainability.  This follows on from the Audit Commission report ‘Integration Joint
Boards – Finance Bulletin 2023/24’ (released in March 2025) which highlights the local and
national financial challenges facing IJBs. 
2.7 NHS Ayrshire and Arran (NHSAAA) has contracted out the delivery of Internal Audit
services to Azets. 
3. Proposals 
3.1 It is proposed that the Committee notes the North Ayrshire Integration Joint Board annual
report for 2024/25 and the approved internal audit plan for 2025/26. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
Agenda Item 8
78

Page 79

4.6 The work of Internal Audit helps to support the efficient delivery of the IJB’s strategic
priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 In preparing the draft IJB audit plan, consultation has taken place with the Director and the
Chief Finance and Transformation Officer of the North Ayrshire IJB and with the internal
auditors of the East and South Ayrshire Integration Joint Boards. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Anne-Marie Fenton, Interim Senior Manager (Internal
Audit), on afenton@north-ayrshire.gov.uk. 
Background Papers
None.
Agenda Item 8
79

Page 80

Agenda Item 8
80

Page 81

NORTH AYRSHIRE COUNCIL 
20 November 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports Issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed since August 2025. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to be
put in place for the objective review of risk management and internal control.  Internal Audit
is an important element in this framework as it reviews internal controls and offers Elected
Members and officers an objective and independent appraisal of how effectively resources
are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal Audit
activity.  The submission of regular reports assists the Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed since August 2025. 
Internal control reviews have been completed in respect of the areas detailed in Appendix
A to this report. The aim of these reviews is to provide assurance that the internal control
framework within the areas examined is appropriate and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of Service
on the completion of each assignment.  Where appropriate, this has included an action
plan with recommendations for improving internal control.  Appendix A includes the report
and action plan from each audit. 
2.3 The findings from 5 separate audit assignments are detailed at Appendix A to this report
and the levels of assurance for each are noted in the table below: 
Audit Title Assurance Level
Housing Indicators Reasonable / Limited
IJB Transformation Substantial
HSCP – Overtime Controls Reasonable
HSCP – Child Protection Substantial
Accounts Payable Transaction Testing Reasonable 
Agenda Item 9
81

Page 82

3. Proposals 
3.1 It is proposed that the Committee notes the outcomes from the Internal Audit work
completed since August 2025. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic priorities
within Our Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment.
Agenda Item 9
82

Page 83

Mark Boyd
Head of Service (Finance) 
For further information please contact Anne-Marie Fenton, Interim Senior Manager (Internal
Audit), on afenton@north-ayrshire.gov.uk. 
Background Papers
None.  
Agenda Item 9
83

Page 84

Appendix A 
Housing Indicators
2023-2024 
1 Background  
1.1    The function of this Audit was to validate a sample of Performance Indicators
submitted via the Annual Return on the Charter (ARC) for the period 2023-2024.  This
is a Scottish Housing Regulator (SHR) requirement for social landlords to demonstrate
how they are achieving the outcomes and standards contained within the charter.  
There are no targets set by the Regulator of what they would expect the Landlord to
achieve. 
1.2  A potential consequence of incorrect reporting and/or missing evidence could be the
requirement to re-calculate and submit data to the SHR.  There could also be more
regular engagement required between the Landlord and Regulator going forward, with
a possibility of validation checks being carried out by the Regulator.  
1.3 The Auditor was provided with a list of all indicators which were contained within the
ARC, and this was reduced to only include those which had not already been
previously validated via the Scottish Housing Network.  The final sample of 5 was
decided after identifying the themes covered by each to ensure it covered a range of
PI’s. 
The 5 Performance Indicators (PIs) tested were as follows:- 
Indicator 
6 – 6.1 – 6.2.2
% of stock meeting SHQS (Scottish Housing Quality
Standard)
Indicator 12
% of tenants who have had a repairs or maintenance
carried out in last 12 months satisfied with the repairs
and maintenance service
Indicator 15 % of anti-social behaviour cases reported in the last
year which were resolved
Indicator 21 Average length of time to complete adaptations
Indicator 24 % of homeless households referred to RSLs under
section 5 and through other referral routes 
1.4 We received further information to advise which teams were responsible for gathering
the data for the return from the Senior Manager (Governance/Building Services) 
Performance Indicator Team Responsible
Collating Data Housing
6 Property Management & Investments (PMI)
12 Building Services
15 Housing
21 Health & Social Care Partnership (HSCP)
24 Housing 
Agenda Item 9
84

Page 85

2 Objectives and Scope  
2.1 The objectives of the audit were as follows:- 
Obtain a list of Return on the Charter Performance Indicators and select a sample of
5 for detailed testing.  From the sample selected conduct the following tests:- 
• Obtain any guidance from the regulator regarding definitions of the PIs and how
they should be calculated.
• Obtain any internal procedure notes describing how the PIs will be calculated and
what processes are in place to ensure these are routinely reviewed and kept up to
date, especially when national PI’s change.
• Review the process for obtaining data for the PI calculation and check for
procedures to ensure consistency.
• Receive back up evidence for recently published PI’s and confirm calculations are
arithmetically correct 
3 Findings  
Applicable to all Performance Indicators 
3.1 A copy of the most recent SHR Guidance (2023) was provided and the service stated
that any changes to this are advised by the regulator, usually by means of a meeting
between the regulator and Landlord/Local Authorities.  Any amendments would be
provided in PDF format and cascaded to relevant departments and staff members
involved in preparing data for ARC.  
3.2 There are no formal internal procedure notes in place to ensure the regulator guidance
was adhered to for 23/24 or updated where necessary.  The auditor was provided with
Data Dictionaries (by the Team Manager – Performance – Housing & Public Protect)
which are to be used for 24/25.  However, these are in draft form and incomplete,
therefore it was not possible to review them in full as part of this audit.  The Technical
Definition (Regulator Guidance) section was completed for all PI Data Dictionaries,
however it was noted that some data was missing.  Staff responsible for data gathering
for each PI were unaware of the Data Dictionaries being a work in progress and
intended for use for 24/25.  Recommendations for improvement have been advised
by email to the Senior Manager (Governance/Building Services) in relation to the
internal procedures (Data Dictionaries).  (action a)  
PI 6 - Percentage of stock meeting SHQS  
3.3 The following is the final submission figures for Indicator 6.  The overall percentage
figure for both testing period and projected for following year has been correctly
calculated based on the figures below. 
Agenda Item 9
85

Page 86

3.4 PMI did not provide an internal procedure note for this indicator.  PMI were able to
provide verbal guidance and show how the figure was calculated for 6.1.1 - The total
number of properties within the scope of the SHQS using the Apex system and Iworld. 
This also included guidance on how properties outwith the scope were excluded.  The
figure matched what was reported - 13329.  The verbal guidance should be included
in the Data Dictionaries going forward. (action a)  
3.5 It was noted during testing that the figure for 6.1.1 included properties classed as “in
abeyance”, which appears to contradict the SHR guidance for the PI.  However, the
figures in PI6 are not input directly to the return, but pulled through from the figures
input to the contextual PI C9.  The guidance for C9 does not state that properties
subject to abeyance or exemption should be excluded.  Officers from PMI contacted
the SHR for clarification and they confirmed that the current approach (including
properties in abeyance) was correct.  Therefore, there is an issue with the guidance
document from the SHR which appears to contradict itself regarding the issue of
properties subject to exemption or abeyance in these 2 PIs, which should be the same,
due to the fact that only one of them is input by the landlord and the other is calculated
automatically from that data.   (action b). 
3.6 PMI were able to provide verbal guidance on how the data was collated however not
how the final figure was calculated for 6.1.2, 6.2.1 or 6.2.2.   In the absence of internal
procedure notes or evidence to support the Auditor was unable to recalculate.  Limited
assurance is provided for PI 6.  (action a)   
PI 12 – Percentage of tenants who have had repairs or maintenance carried out
in the last 12 months satisfied with the repairs and maintenance service  
3.7 The following are the final submission figures for Indicator 12.  The overall percentage
figure has been correctly calculated based on the figures below. 
Agenda Item 9
86

Page 87

3.8 Building Services were able to provide verbal guidance and show how the figures were
calculated for the indicator.  A step-by-step guide of the process and systems used
(Rocc) was provided, however this requires to be expanded to ensure regulator
guidance is followed and updated as required and should form part of the Data
Dictionaries going forward.  (action a)  
3.9 The auditor was satisfied that the surveys were carried out within the correct testing
period following the regulator guidance.  A total of 1564 tenants took part in the survey
which was request by the contractor using a handheld device at the end of the repair
works.  The evidence provided was summarised into response categories using a
Pivot which was re-tested by the auditor confirming the figures submitted were correct
for each response.  The auditor recalculated the total and percentage satisfied with
the repairs service and agreed with the figures in the submission.  
3.10 The Guide to Surveying Tenants states the following with regards to PI 12:- 
“SHR permits landlords to submit existing performance data on repairs and
maintenance rather than collect it via the survey. Landlords wishing to use existing
performance data should:- 
(a) ensure the question used in their regular performance monitoring matches the
wording of indicator 12. 
(b) inform the SHR of their intention to use performance rather than survey data. 
(c) ensure their submission includes details of the time period covered, number of
feedback requests issued and the number of returns on which results are
based." 
The auditor found that the SHR had not been advised reporting was via performance
data rather than survey for 23/24 and the additional information required (noted in
point c) had also not been provided. (action c)   
3.11 It was found by the auditor that the wording for the available answers was not as
advised within the SHR guidance.  It currently reads Satisfied and Dissatisfied (within
the Rocc Mobile application) should have read Fairly Satisfied and Fairly Dissatisfied
in the survey available answers as per the ARC.  This does not have a material impact
on the overall percentage reported.  It is however suggested the wording is amended
Agenda Item 9
87

Page 88

within the Rocc survey to reflect that of the regulator guidance going forward. 
Reasonable assurance is provided for PI 12.   (action c)   
PI 15 – Percentage of anti-social behaviour cases reported in the last year which
were resolved  
3.12 The following are the final submission figures for Indicator 15.  The overall
percentage figure has been correctly calculated based on the figures below. 
3.13 Housing (Local Housing Offices and ASBIT) were able to provide verbal guidance and
show how the figures were calculated for the indicator.  A step-by-step guide of the
process/systems used (Access) was provided by ASBIT only - this requires to be
expanded to ensure regulator guidance is followed and updated as required and
should form part of the Data Dictionaries going forward.  (action a)  
3.14 The evidence provided for PI 15 does not match what was reported for 15.1 – The
number of cases of anti-social behaviour reported in the last year.  961 were reported
to the ARC however the total from the evidence was 1030.  The discrepancy was
identified within the Local Office figures for Irvine with 69 cases not included in the
count between the months of January 24 - March 24.  The service believes this to
have been caused by a typing error.  The Data Dictionaries should be updated to
ensure that there is a data validation process in place prior to submission to ARC.
(action a)  
3.15 The evidence provided for PI 15 does not match what was reported for 15.2 – of those
at 15.1, the number of cases resolved in the last year.  882 cases were reported
resolved to the ARC and the total from the evidence was 891.  The discrepancies were
identified as follows: 
• Irvine reported 253, evidence suggests 254
• Kilwinning reported 68, evidence suggests 69
• Three Towns reported 177, evidence suggests 178
• Kilbirnie reported 42, evidence suggests 48 
If the overall percentage were to be re-calculated for this PI it would change to 86.50%,
meaning the reported figure has been overstated by 5.28 percentage points.  (action
d) 
3.16 The local offices had not retained the required evidence for 15.2 at original report
dates (23/24).  The report was re-produced in March 2025.  If any of the original cases
were edited this could provide a reason for the differences.  The auditor is unable to
confirm this.  Limited assurance is provided for PI 15. (action d)    
Agenda Item 9
88

Page 89

PI 21 – The average time to complete adaptations  
3.17 The following is the final submission figures for Indicator 21.  The overall percentage
figure has been correctly calculated based on the figures below. 
3.18 HSCP did not provide an internal procedure note for this indicator.  HSCP were able
to provide verbal guidance and show how the figure was calculated for both 21.1 and
21.2.  In the absence of a procedure note it was unclear as to which date should be
used as the starting point.  The auditor was verbally advised it should be date
approved by Occupational Therapy (OT) however calculations have been based on
date assessed by OT.  In most cases these dates are the same, but not always.  A full
procedure note should be created and added to the Data Dictionaries, referring to
SHR guidance. (action a)  
3.19 The auditor agreed the total adaptations for 23/24 were 860 (2.12).  However, it was
noted that due to incorrect completion dates being input into the spreadsheet some
adaptation days to complete had a negative figure.  The reported figure of 77905 is
therefore inaccurate.  There are a total of 5 negative figures within this data.  The
service were advised and corrected the 5 identified as errors and a new total of 78387
days was obtained.  This would then change the final figure for average time to
complete adaptations to 91.15 days.  There is also a risk of further keying errors
affecting the rest of the data, which are not as easily identified.  Limited assurance can
be provided for PI 21 (action e) 
PI 24 – The percentage of homeless households referred to RSLs under
section 5 and other referral routes  
3.20 The following is the final submission figures for Indicator 24.  The overall percentage
figure has been correctly calculated based on the figures below. 
3.21 Homelessness Prevention and Housing Advice were unable to provide an internal
procedure note for PI 24.  However, we were verbally advised that reports are run
Agenda Item 9
89

Page 90

from Civica and figures are collated by the Co-ordinator - Performance – Housing and
Public Protect prior to ARC submission.  A pivot is created to summarise results.  The
auditor assessed the data and re-ran the pivot tables using the evidence provided and
it was found to match what was reported.  The Data Dictionaries should be updated
to provide staff with a step-by-step procedure note, making reference to the SHR
guidance for definition, inclusions and exclusions.  Reasonable assurance can be
provided for PI 24.   (action a) 
4 Internal Audit Opinion  
4.1 An overall Audit opinion was provided as follows for each Performance Indicator:-   
Performance Indicator 06 -    Limited 
Performance Indicator 12 -    Reasonable 
Performance Indicator 15 -    Limited 
Performance Indicator 21 -    Limited 
Performance Indicator 24 -    Reasonable 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
Agenda Item 9
90

Page 91

KEY FINDINGS AND ACTION PLAN
Housing Indicators
2023-2024 
Action a
Finding No formal internal procedure notes are in place to ensure that
Regulator guidance is followed and updated as required for the
period tested - 23/24. 
Incomplete Data Dictionaries have been provided and are
intended for use for 24/25, however there are currently in draft
form. 
It was also noted that some staff responsible for collating the data
for the ARC were not aware of the Data Dictionaries.
Action Description Review the SHR guidance and audit recommendations to ensure
Data Dictionaries are fully completed and issued to appropriate
staff prior to 24/25 SHR ARC return being completed.   
This will ensure consistency in data collection from year to year.   
Data Dictionaries should also make reference to what evidence is
required to be kept, which format is used to present it and where
this should be centrally filed. 
Risk Inaccurate reporting to ARC as required by SHR, due to
inconsistent data collection.  Lack of consistency reduces
comparability of PIs and therefore usefulness for management
decision-making.  Lack of clear instructions for new staff if those
who currently prepare the PIs are unavailable in the future.
Priority (1, 2, 3) 1
Paragraph Reference  3.2, 3.4, 3.6, 3.8, 3.13, 3.14, 3.18, 3.21
Managed by Head of Service (Housing & Public Protection)
Assigned to Team Manager (Performance)
Due Date 30th September 2025
Management Comment Draft data dictionaries will be updated to reflect comments within
the audit report.  The Performance Team in HPP will ensure that
all indicators have a data dictionary and that these are completed
and signed off by the appropriate service. 
Agenda Item 9
91

Page 92

Action b
Finding It was noted during testing that the figure for 6.1.1 included
properties classed as “in abeyance”, which appears to contradict
the SHR guidance for the PI.  However, the figures in PI6 are not
input directly to the return, but pulled through from the figures
input to the contextual PI C9.  The guidance for C9 does not state
that properties subject to abeyance or exemption should be
excluded.  Officers from PMI contacted the SHR for clarification
and they confirmed that the current approach (including
properties in abeyance) was correct.  Therefore there is an issue
with the guidance document from the SHR which appears to
contradict itself regarding the issue of properties subject to
exemption or abeyance in these 2 PIs, which should be the same
due to the fact that only one of them is input by the landlord and
the other is calculated automatically from that data. 
Action Description Management should consider writing to the SHR to formally raise
the issue that there is inconsistency in their guidance document
regarding the inclusion of properties subject to exemption or
abeyance in the PIs 6 and C9.
Risk Different landlords, or officers preparing the return in different
years, will interpret the guidance differently, detracting from the
usefulness of the PI for comparison over time or between
organisations.  
Priority (1, 2, 3) 3
Paragraph Reference  3.5
Managed by Head of Service (Housing & Public Protection), Head of Service
(Sustainability, Transport & Corporate Property)
Assigned to Head of Service (Housing & Public Protection)
Due Date 30th June 2025
Management Comment Although the SHR have confirmed NAC’s current interpretation of
the guidance is accurate, Housing Services will approach the
SHR to discuss the ambiguity in the wording of the guidance. This
will form part of a scheduled meeting on 11 June and any follow-
up actions agreed with the SHR at that time will be progressed in
liaison with PMI.   
Agenda Item 9
92

Page 93

Action c
Finding For PI 12, the wording for the available answers “Satisfied” and
“Dissatisfied” should have read “Fairly Satisfied” and “Fairly
Dissatisfied” in the survey available answers as per the SHR
Guidelines and ARC submission. 
SHR had not been advised reporting is via performance data
rather than survey for 23/24 and the additional information
required had also not been provided (as per the guide to
surveying tenants)
Action Description The available options for the stand-alone questionnaire provided
to tenants for reactive repairs via the Rocc Mobile Application
should be amended to reflect the SHR guidelines, by adding the
word “fairly” as follows (words to be added underlined);- 
Very Satisfied
Fairly Satisfied
Neither satisfied or dissatisfied
Fairly Dissatisfied
Very Dissatisfied 
Going forward Data Dictionaries should be updated with
procedures to ensure SHR are advised of the use of performance
data rather than survey and provide additional information they
require when using performance data as per the guide to
surveying tenants.
Risk We are not following the structured wording for the survey as per
current SHR guidelines.  There is a very small chance that some
respondents might have answered differently given the different
wording.  We have also not followed the procedure set out by SHR
when using performance data rather than survey.
Priority (1, 2, 3) 3
Paragraph Reference  3.10, 3.11
Managed by Head of Service (Housing & Public Protection)
Assigned to Senior Officer (Systems & Intelligence)
Due Date Complete
Management Comment System has been updated to reflect changes.  In the submission
of the 2024/25 ARC the following was added to the Comments
(Housing quality and maintenance) section: "...Tenant satisfaction
with reactive repairs is gathered using transactional surveys
throughout the reporting period to ensure feedback is captured
timeously and appropriate action taken to address any areas of
concern." 
Agenda Item 9
93

Page 94

Action d
Finding For PI 15, incorrect data has been reported to the ARC for 15.1 &
15.2. 
Action Description ASBIT and Local Housing Offices should review the SHR
requirements and ensure data validation checks are in place.  Any
evidence used in calculations should be retained. This procedure
should be contained within the Data Dictionaries.
Risk Inaccurate reporting to ARC due to data not being verified prior to
submission.  
Priority (1, 2, 3) 1
Paragraph Reference  3.15, 3.16
Managed by Head of Service (Housing & Public Protection)
Assigned to Senior Manager (Housing Operations)
Due Date 31st July 2025
Management Comment Monthly ARC reporting will be undertaken, and records will be
validated at this point to prevent errors - this will be documented
within the data dictionaries. 
Action e
Finding For PI 21, incorrect data has been reported to the ARC due to an
error in the data manually typed into the ‘Adaptations Completed’
spreadsheet for 23/24.
Action Description Additional quality control checks should be introduced to ensure
the start/end dates input to the ‘Adaptations Completed’
spreadsheet are correct, as this affects the overall data reported
to ARC.
Risk Inaccurate reporting to ARC due to data not being verified prior to
submission.
Priority (1, 2, 3) 1
Paragraph Reference  3.19
Managed by AHP Senior Manager & Professional Lead  
Assigned to Service Manager (Community Occupational Therapy,
Adaptations and Dirrans Centre)
Due Date 30th September 2025
Management Comment Quality checks will be undertaken prior to the information being
submitted, ensuring data can be validated and dates are reflective
of the work undertaken. This will include an ARC reporting SOP.
Data dictionaries will also be updated to note this. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of
the control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
Agenda Item 9
94

Page 95

IJB TRANSFORMATION 
1 Background  
1.1 North Ayrshire Health & Social Care Partnership (HSCP) is subject to a significant
budget challenge and a recovery plan was agreed in June 2024.  It has a large and
complex Transformation Plan which aims to achieve significant cost reductions as well
as improvements to services.  
1.2 In March 2024, a new Transformation Plan covering the period 2024-27 was agreed
by the IJB (Integration Joint Board).  At the time of this renewal of the plan, the
governance arrangements for the Transformation Plan were also reviewed.  The
projects cover all areas of the HSCP and include large workstreams and small
individual projects, and governance arrangements are adjusted according to the scale
of the activities.   
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• there are adequate governance arrangements in place for transformation
workstreams
• adequate financial monitoring arrangements are in place for the transformation
workstreams
• that there are adequate programme management arrangements in place for
transformation workstreams.   
3 Findings   
Governance Arrangements  
3.1 All projects are allocated to a Planning Manager in the HSCP’s Transformation team. 
The team use a tracker in Microsoft Lists which details all of the projects (79 at the
time of audit testing) and can be accessed by all members of the Transformation
Board.  The fields recorded in the tracker include ownership, anticipated savings,
quarterly updates and deliverables and a RAG status.  The Planning Managers update
the tracker at least once a quarter.    
3.2 The information on the tracker is used to produce a one-page dashboard to give a
high-level indication of the progress of the Transformation Plan.  The dashboard can
also be filtered to show information for a particular service.   The dashboard is still
being refined and some small discrepancies in classification of projects were noted,
which the Senior Manager (Strategic Planning and Transformation) stated she would
investigate and discuss with the Planning Managers.  However, in general the
dashboard is a very useful tool for giving an overall impression of the progress being
made against the Transformation Plan as a whole.  It was agreed during the audit
period that the tracker would be presented to the Transformation Board as a standing
item on a quarterly basis.  
3.3 The Transformation Board meets approximately monthly and is chaired by the Director
of the HSCP, or in her absence the Chief Social Work Officer. Agendas and minutes
were reviewed by the auditor. It is regularly attended by all of the Partnership’s Senior
Management Team, relevant managers from the partnership and other Council
Agenda Item 9
95

Page 96

services involved in the projects, and members of the Transformation team.  It has an
agreed Terms of Reference document which outlines the membership, purpose, remit
and reporting lines.  It was noted that the Terms of Reference stated that action notes
from the Board meetings would be shared at each IJB via the Director’s report, but this
has not been done in practice, at the request of the IJB.  However, the IJB have
received 6-monthly updates on the progress of the Transformation Plan, including a
copy of the dashboard mentioned at 3.2.  The Senior Manager (Strategic Planning and
Transformation) prepared a revised Terms of Reference to reflect the reporting
arrangements to be presented to the Transformation Board in July 2025. (action a)  
3.4 The Transformation team have developed a suite of template documents for use in
project management, including a Project Request Form, Project Initiation Document
(PID), Exception Report and Project Closure Report.  These documents are required
since the governance arrangements were reviewed in March 2024, but they were not
required in retrospect for projects that had already commenced.  There are too many
projects for the Transformation Board to receive an update every time, so reporting is
by exception.  They receive a PID for every project and receive reports on issues and
exceptions.  
3.5 The template documents are generally of a high standard, laying out clearly all the
information required at the appropriate stage of projects.  However, it was noted that
in the PID template, the risk section consisted of a standard paragraph referring to the
HSCP’s risk approach and stating that “Risks and issues are regularly reviewed and
updated as part of project monitoring.”  The auditor suggested that it would be
appropriate for the PID stage that the risks identified up to that point in the project
should be included in the information presented to the board and the Senior Manager
(Strategic Planning and Transformation) agreed to add this in.   
Financial Monitoring  
3.6 The Section 95 Officer for the IJB is usually the Head of Service for both Finance and
Transformation, although the post is currently vacant and therefore the Principal
Manager (Finance) is the interim Section 95 Officer.  The Head of Service and the
Principal Manager (Finance) are both members of the Transformation Board.  Savings
attached to the transformation projects are monitored through the tracker. 
Achievement of savings are also reported to the IJB regularly as part of the budget
monitoring reports.  The budget monitoring reports do not focus on the Transformation
projects or separate them out from other projects and activities.  However, the reports
are timely and clearly laid out and any variance significant enough to affect the overall
outlook of the HSCP would clearly be highlighted given the format and parameters of
the reports.  
3.7 Each project or programme manages their own budget and any significant deviation
would be reported by exception to the Transformation Board.  Any that impacted the
overall position of the HSCP would also be reported to the IJB as mentioned at 3.4. 
No significant budgetary divergences have occurred but the processes to be followed
are clear.  The frequency of reporting and membership of the groups ensure that
divergences would be highlighted to senior managers and IJB members in a timely
manner.   
Programme Management  
3.8 A sample of 3 projects was selected for review of project management arrangements:
Brighter Pathways, Blue Badges and Trakcare.  These projects cover different
services and are of different sizes, therefore they had different governance
Agenda Item 9
96

Page 97

arrangements appropriate to the size.  Further details of this testing is outlined at
paragraphs 3.10-3.20 below.  
3.9 Further to the sample projects, Internal Audit noted during the review of
Transformation Board papers discussions relating to the Magic Notes project, which
involves use of AI-based software and is expected to bring significant financial savings
and improve recruitment and retention of social workers.  However, the Council’s
Information Governance and IT Customer Teams sent out emails in September 2024
and February 2025 respectively that stated that services must not implement any AI-
based solutions without involving the Information Governance and Cyber Security
teams at the outset.  Assurance was obtained that these teams had been involved and
that Data Protection Impact Assessment and corporate procurement processes were
being followed.     
Brighter Pathways  
3.10 Brighter Pathways is a large workstream consisting of 7 projects relating to
remodelling children and young people’s care options. The Council’s Housing,
Education and HR services are involved in some of the projects, alongside the HSCP. 
The workstream has its own programme board and the individual projects also have
project boards. 
3.11  The programme has a well-structured risk register, including named responsible
officers and mitigating actions.  The risk register is reviewed monthly at the
Programme Board meeting.  A risk was highlighted to the Transformation Board in
February 2025 regarding poor attendance, which had led to Programme and Project
Board meetings being cancelled.  The Planning Manager for the workstream gave
assurance that attendance has improved since this exception was highlighted.  
3.12 The Head of Service (Children, Families & Justice) is the main budget holder for this
workstream.  There is a Senior Accountant in the HSCP’s Finance team with
responsibility for that service and she provides financial monitoring information to the
Head of Service and other managers as part of the routine budget monitoring.  She
regularly meets with the senior managers in the service to review and discuss the
financial position as this is a high-risk area (low volume / high-cost services areas e.g.
Children’s residential placements).  She regularly prepares projections based on
assumed discharge dates etc.  She provides the project managers with any costings
required for the Brighter Pathways work.   
Blue Badge Service  
3.13 The Blue Badge Service project consisted of a review of the Blue Badge Policy and
processes for the administration of blue badges.  The project commenced before the
current governance structures for the Transformation Plan were in place, but it
followed the PRINCE2 project management methodology. The project was completed
in November 2024 and a closure report was presented to the Transformation Board in
January 2025.  
3.14 A risk register was prepared for the project and reviewed regularly by the Planning
Manager and the project lead, the Service Manager (Community Occupational
Therapy, Adaptations and Dirrans Centre).  Only 1 risk was identified.  This risk was
the subject of an exception report to the Transformation Board and was subsequently
resolved.  
Agenda Item 9
97

Page 98

3.15 The project was completed within existing resources and did not have any savings
targets attached to it; therefore no specific financial monitoring was undertaken.   
Trakcare  
3.16 Trakcare is an IT system for the management of appointments and performance
reporting, which is being rolled out to all Mental Health services in North, South and
East Ayrshire.  The project initially commenced in 2020 but has faced delays due to a
variety of factors including the complex governance arrangements of working across
the different organisations, the complexity of implementing the system in the numerous
different specialities and teams within Mental Health, changes of personnel and
sickness and maternity leave within the project team.  There are 28 teams expected
to move over to the system, of which 18 had gone live at 2nd June 2025.  The remaining
teams are expected to go live by March 2026.  
3.17 The project has a project board with a large membership.  There were some issues
with attendance, which led to a number of meetings being cancelled in the later part
of 2024.  The frequency of the meetings has been reduced since, but this has ensured
that they went ahead as planned.  The Planning Manager maintains a project plan
spreadsheet to monitor progress of the rollout and produces monthly highlight reports
which are shared with the project board.  
3.18 The project has a risk register which includes ownership and mitigating actions. Live
risks are included in the highlight reports and discussed at the project board meetings. 
The auditor queried a particular mitigating action which had been uncompleted for
several months, as it required sign-off from a specific Clinical Governance Group
within NHS Ayrshire & Arran.  The planning manager stated that there had been a
number of barriers but that a short life working group was being pulled together to
ensure that it would be signed off.  
3.19 There has been an issue with benefit realisation as the required development of
reports in Trakcare, which would allow other databases to be shut down, thus
improving the efficiency of administrative processes, has not been as quick as hoped,
but this was raised at the Transformation Board and meetings are being held to
address the issue.  
3.20 There are no savings targets attached to this project and it is generally being managed
within existing resources, other than a one-off investment to pay for staff overtime to
migrate patient records and appointments.  Therefore, there is no specific financial
monitoring for the project.   
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the governance of the
HSCP’s Transformation Plan.  The current governance arrangements include clear
reporting lines and involve senior managers at an appropriate level.  The
Transformation Board meets regularly and has a good overview of the projects,
including access to a tracker which is summarised in a 1-page dashboard. A low
priority action has been recommended to correct a discrepancy in the Terms of
Reference for the Board.    
4.2 Projects have governance arrangements which are appropriate to their size.  The
documentation required for the projects is clearly laid out and includes the requisite
elements to give managers and sponsors the information they require for decision-
Agenda Item 9
98

Page 99

making. Risk registers are maintained for the projects and regularly reviewed. 
Exceptions are escalated and appropriate actions put in place.  Financial monitoring
arrangements are in place that would highlight any significant divergences from
budget.   
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
Agenda Item 9
99

Page 100

KEY FINDINGS AND ACTION PLAN
IJB TRANSFORMATION 
Action a
Finding It was noted that the Terms of Reference stated that action notes
from the Board meetings would be shared at each IJB via the
Director’s report, but this has not been done in practice, at the
request of the IJB.  However, the IJB have received 6-monthly
updates on the progress of the Transformation Plan.  The Senior
Manager (Strategic Planning and Transformation) prepared a
revised Terms of Reference to reflect the reporting arrangements
to be presented to the Transformation Board in July 2025.
Action Description The revised Terms of Reference should be presented to the
Transformation Board for approval.
Risk The arrangements for reporting the progress against the
Transformation Plan to the IJB are not compliant with the Terms
of Reference of the Transformation Board.
Priority (1, 2, 3) 3
Paragraph Reference  3.3
Managed by Director (HSCP)
Assigned to Chief Social Work Officer
Due Date 20th August 2025
Management Comment The Transformation Board in July was cancelled due to leave, the
Terms of Reference is on the agenda for the next meeting on 20th
August.   At which point this action will be complete. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
Agenda Item 9
100

Page 101

HSCP OVERTIME CONTROLS 
1 Background  
1.1 Following the finalisation of the 2024/25 outturn position, the Integration Joint Board (IJB)
agreed some initial recovery actions at the meeting in June 2024. In line with the
requirements of the integration scheme, work has continued to develop the financial
recovery plan and identify further targets for financial improvements until the year-end. 
1.2 
1.3 
To strengthen the on-going financial recovery plan to deliver cost reduction targets, it is
important to review the controls put in place by HSCP to restrict all but essential overtime
working by carrying out control testing against the overtime process. 
Consequently, the review focussed on the arrangements in place for ensuring that
controls around the authorisation and payment of overtime across HSCP are compliant
with internal governance and conform with the recovery plan to deliver cost reduction
targets, while carefully managing the level of risk.  
1.4 A trend analysis of HSCP overtime payments was carried out to compare the cost of
overtime over the last two financial years. There has been an overall decrease of 14.92%
across both care at home and non-care at home, which amounts to £229k as shown in
the table below. 
Description £ Care At Home Non- Care At Home
Overtime amount 23/24 1,537,620.03 1,008,689.67 528,930.36
Overtime amount 24/25 1,308,185.74 955,877.53 352,308.21
Difference 229,434.29 52,812.14 176,622.15
% Decrease 14.92% 5.24% 33.39% 
1.5 The drivers for the large expenditure on overtime across the services are reported by
HSCP managers to be sickness, staff absence, training issues, safer staffing levels,
unforeseen events, vacancies, retirement, to complete short notice court reports and to
support children and families in crisis at weekends. 
2 Objectives and Scope  
2.1 The main objective of the audit was to carry out a detailed review of controls around the
authorisation and payment of overtime across HSCP to: 
• Ensure documented procedures are in place to cover the process of arranging,
recording, approving and paying overtime. 
• Ensure overtime payments are valid, properly authorised and no duplicate
overtime payments have been made.  
2.2       The period covered by the audit is 1st April 2024 to 31st March 2025      
Agenda Item 9
101

Page 102

3 Findings 
Procedures and Reports    
3.1  Care at Home (CAHs) and non-Care at Home (NCAH) overtime process documents
relating to arranging, recording, approving and paying overtime were reviewed.  
3.2  The review of the most current process notes and operating procedures for HSCP
overtime found that they did not incorporate the following, to aid better understanding
of the activities involved in overtime processing:
• A brief description of each of the activities e.g Transaction upload process, Bank
report, Additional time report, Community alarm, Contracted staff etc.
• The objective of each activity in the overtime process or procedural documents 
• Brief descriptions of the systems or applications for capturing overtime activities
e.g CM (care management) system, CHRIS (Comprehensive Human Resource
Integrated Solution) 
• An overview of the periodic reporting arrangements e.g. the report type and
frequency.
• The process for dealing with excess overtime payments in conjunction with
finance debt recovery team. (action a)   
HSCP Overtime Process, Authorisation and Payment  
3.3 A sample of 20 overtime payments consisting of Care at Home (CAHs) and non-Care at
Home (NCAH) across the HSCP within the last 12 months were reviewed to assess if
overtime payments complied with the Overtime Payment procedures.  
3.4       The overtime payments generally complied with the HSCP Overtime Control process.
However, some issues with adequacy of some individual documents were identified and
are summarised below:
• Reason stated on a timesheet for overtime was not valid or detailed as only
office/visits was captured as reason for some overtime payment totalling £1,019.67.
(NB Subsequent to the audit fieldwork, this was highlighted as a potential
overpayment and has been referred to the Corporate Fraud Team for further
investigation.)
• The reasons for 2 overtime payments were not indicated on the timesheets or
supporting documents amounting to £1,400.76
• An amendment of the overtime hours on a timesheet was not signed off by the
supervisor or authorised signatory to authenticate the amendment. (action b)  
3.5    Through a review of the potential overtime duplicate reports, we found that 30 overtime
payments, totalling £3,639.28, were overpaid to employees of which 14 payments have
been resolved while 16 payments, amounting to £2,397.51, were unresolved but have
now been transferred to the finance debt recovery team for recovery.  This included 13
overpayments amounting to £2,082.49 to a single employee between August and
October 2024 which had been marked as passed to debtors by the team, but had actually
been missed and had not been passed to debt recovery.  This was passed to debt
recovery when highlighted by the auditor. Payment recovery is currently in progress for
all the unresolved overpayments and legal proceedings had commenced on one of the
debtors.  (actions c, d)  
Agenda Item 9
102

Page 103

3.6  We observed that HSCP overtime payments especially non-CAH and Senior Care at
Home are still being processed manually by inputting overtime hours from timesheets
into CHRIS. This partly accounted for the duplicate overtime payments and use of
incorrect rate or hours in the overtime calculations. The majority of the payments have
been recovered from the affected employees. (action c) 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the overtime control
process. The overtime payments generally complied with the HSCP Overtime Control
process. However, some issues with adequacy of some individual documents were
identified to improve the quality of compliance with procedures.  An oversight had led
to a significant overpayment not being followed up.     
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
Agenda Item 9
103

Page 104

KEY FINDINGS AND ACTION PLAN
OVERTIME CONTROLS PROCESS 
Action a
Finding We have reviewed the most current process notes and operating
procedures for HSCP Overtime Controls and observed that the
procedures did not adequately incorporate all of the activities of
the HSCP Overtime Controls process. 
Action Description The process notes or operating procedure should be updated to
include all activities to aid better understanding of the HSCP
Overtime Controls processes. For example, these should be
updated to include: 
• A brief description of each of the activities e.g Transaction
upload process, Bank report, Additional time report,
Community alarm, Contracted staff etc.
• The objective of each activity in the Overtime process or
procedural documents 
• Brief descriptions of the systems or applications for
capturing overtime activities e.g CM, CHRIS 
• An overview of the periodic reporting arrangements e.g.
the report type and frequency.
• The process for guiding excess overtime payments in
conjunction with finance debt recovery team 
Risk Inconsistent approach by staff, possible key tasks not being
carried out and lack of business continuity if staff familiar with the
process are not available.
Priority (1, 2, 3) 2
Paragraph Reference  3.2
Managed by Director (HSCP)
Assigned to Principal Manager (Business Support) 
Due Date Complete
Management Comment HSCP Overtime Controls processes have been updated to reflect
the above clarification 
Action b
Finding The overtime payments generally complied with the HSCP
Overtime Control process. However, some issues relating to the
adequacy of some individual documents were identified such as,
the reasons for overtime stated on timesheets were not
sufficiently detailed and the amendment of overtime hours on a
timesheet was not signed off.
Action Description HSCP Admin should always challenge service teams when
instances of non-compliance relating to inadequacy of overtime
documentations are identified.
Risk Non-compliance with process notes or procedures are not
identified and corrected which can lead to errors in overtime
payments.   Poor use of officer time correcting errors.
Priority (1, 2, 3) 2
Paragraph Reference  3.4
Managed by Director (HSCP)
Assigned to Principal Manager (Business Support) 
Due Date Complete
Agenda Item 9
104

Page 105

Management Comment All HSCP employees have been emailed reminder as to how the
overtime claim form should be completed and to ensure the
reason for overtime is detailed. 
HSCP Resourcing team have been reminded to ensure the
reasons for overtime are adequately detailed and if not, return the
form. Any amendment of overtime hours on a timesheet will be
signed off by Administrative Officer. 
Action c
Finding Through a review of the potential overtime duplicate reports, we
found that 30 overtime payments totalling £3,639.28 were
overpaid to employees of which 14 payments have been
resolved, while 16 payments amounting to £2,397.51 were
unresolved but had now been transferred to the finance debt
recovery team for recovery. 
We observed that HSCP overtime payments especially non-CAH
and Senior Care at Home are still being processed manually by
inputting overtime hours from timesheets into CHRIS. This partly
accounted for the duplicate overtime payments, use of incorrect
rate or hours in the overtime calculations.
Action Description The HSCP Business Admin Manager should remind the team to
always check the accuracy of payments when they are
processing claims to prevent errors.  
Risk Loss of funds due to errors leading to overtime overpayments.
Poor use of officer time correcting errors.
Priority (1, 2, 3) 2
Paragraph Reference  3.5, 3.6
Managed by Director (HSCP)
Assigned to Principal Manager (Business Support) 
Due Date Complete
Management Comment HSCP Resourcing team have been reminded to always check the
accuracy of payments when they are processing claims to prevent
errors - once calculated a second staff member checks the claim
for accuracy.  Once the claim is keyed to CHRIS the Admin Officer
checks the keying for accuracy. 
Action d
Finding Through a review of the potential overtime duplicate reports, we
found that 30 overtime payments, totalling £3,639.28, were
overpaid to employees of which 14 payments have been resolved
while 16 payments, amounting to £2,397.51, were unresolved but
had now been transferred to the finance debt recovery team for
recovery. This included 13 overpayments amounting to £2,082.49
to a single employee between August and October 2024 which
had been marked as passed to debtors by the team, but had
actually been missed and had not been passed to debt recovery.
Action Description HSCP Business Admin should periodically review the
overpayments passed to debt recovery to obtain an updated
position on progress of the recovery. 
Risk Overpayments are not recovered in a timely manner. 
Priority (1, 2, 3) 2
Paragraph Reference  3.5 
Agenda Item 9
105

Page 106

Managed by Director (HSCP)
Assigned to Principal Manager (Business Support)
Due Date Complete
Management Comment HSCP Business Admin will undertake a 6-8 weekly check with
Debt Recovery to ensure that all overpayments are in progress. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
Agenda Item 9
106

Page 107

GOVERNANCE OF CHILD PROTECTION 
1 Background  
1.1 Chief Officers (defined by the Scottish Government (SG) as the Chief Constable, Chief
Executive of Health Boards and Chief Executive of Local Authorities) are responsible
for ensuring their agencies, both individually and collectively, work to protect children
and young people.  
1.2 The Child Protection Committee (CPC) is the local strategic planning partnership
through which Chief Officers discharge this responsibility.  The CPC is responsible for
developing and implementing child protection policy and strategy across and between
agencies.  
1.3 The SG published an updated version of the ‘National Guidance for Child Protection
in Scotland’ in August 2023.   
2 Objectives and Scope  
2.1 The objective of this audit was to ensure HSCP can evidence it:-
• considered the SG Guidance update and made any necessary changes to
procedures and working practices
• Clearly communicated any updates to staff
• Continues to monitor the impact of North Ayrshire’s approach to child protection to
ensure it remains aligned with the aspirations of the Scottish Government guidance 
2.2 This audit has focussed on reviewing the governance structure around child protection
in North Ayrshire. Individual child protection cases were not considered, or assessed,
as part of this Audit.   
3 Findings   
Guidance  
3.1 In response to the updated SG Guidance, the Child Protection Lead Officer from each
of the 3 Ayrshire councils came together to produce the ‘Ayrshire Multi-Agency Child
Protection Practitioner Procedures’.    
3.2 These procedures condense information from the SG guidance, but also include:-
• key information boxes – to highlight the changes from earlier guidance
• practice notes – which give examples of the application of the guidance
• flowcharts – to aid understanding of processes  
3.3 North Ayrshire’s CPC supplemented the Pan-Ayrshire procedures with briefing notes.
These were produced by a short-life multi-agency implementation sub-group set up
for this specific task. 
3.4 By September 2023, 6 briefings had been produced.  These were:-
• Child Protection Risk Factors Briefing
• Contextual safeguarding 7 minute brief
• CP Guidance Risk Factors
Agenda Item 9
107

Page 108

• Interim Safety Plan Briefing
• Inter-Agency Referral Discussion (IRD) Briefing
• Open IRD Process Briefing  
3.5 The Service confirmed that briefing notes continue to be produced as necessary.  This
was evidenced by the Child Protection Lead Officer being involved in the production
of guidance on working with 16-17 year olds in May 2024.  
3.6 The Head of Service (Children, Families & Justice) confirmed to CPC that the new
national guidance was implemented by North Ayrshire in September 2023.   
Communication  
3.7 Each member of the CPC implementation sub-group was responsible for distributing
briefings within their own agency.  
3.8 Within NAHSCP, briefings were shared with all Team and Senior Managers within
Social Work, for further dissemination to relevant officers.  Emails were provided by
the Service to evidence this.  
3.9 There is no central storage location for child protection procedures within HSCP. 
(action point a) 
Monitoring  
3.10 In order to assess how CPCs were implementing the Child Protection National
Guidance, the SG required all CPCs to complete a self-evaluation toolkit and submit
their findings.    
3.11 This toolkit required CPCs to look at 8 key areas in the Guidance – answer direct
questions on implementation with either ‘in full’, ‘in part’ or ‘yet to start’, and then
provide narrative responses detailing progress, success and challenges relating to the
implementation.    
3.12 North Ayrshire’s submission was reviewed by the CPC prior to submission.   The
Service has confirmed that areas for improvement highlighted by the assessment were
incorporated into the CPC Improvement Plan and the related sub-group action plans.  
3.13 The ongoing application and impact of child protection procedures across North
Ayrshire is monitored in a number of ways:-   
Pan-Ayrshire  
3.14 The CPC Chair, Child Protection Lead Officer and Chief Social Work Officer from each
of the 3 Ayrshires meet regularly.  This provides an opportunity to share findings,
issues etc.   
CPC  
3.15 The CPC maintains an overview of child protection across North Ayrshire agencies via
its quarterly meetings.  
3.16 As standard, these meetings include:-
• updates from Services – (Education, Child Protection Health Team, Children,
Families & Justice Services, SCRA, Police Scotland) on current workloads
Agenda Item 9
108

Page 109

and emerging issues 
• updates from CPC sub-groups on current tasks  
3.17 The update from the Management Information sub-group includes a quarterly data
report on child protection activity in North Ayrshire.  This report includes:- 
• standard indicators set by the Centre for Excellence for Children’s Care and
Protection (CELCIS).  These have been designed to help CPCs consistently
collect, analyse, and report on child protection data.
• Additional indicators requested by the CPC to support them with identifying
trends within North Ayrshire.  
3.18 The above ensures the CPC has timeous information on what is happening across all
partner agencies in North Ayrshire and is aware of any areas of concern.  
3.19 In addition to the routine monitoring noted above, the CPC also monitors its strategic
direction via its 3 year Improvement Plan (2023-2026).  This Plan comprises detailed
actions for each of its 3 key priorities.  Each action in the Plan has monitoring criteria
such as how performance will be monitored, reporting frequency and RAG status.  All
actions are allocated to 1 of the 5 CPC sub-groups for action.     
HSCP  
3.20 Monitoring within HSCP is primarily via professional supervision by a more senior
manager.    
3.21 Audit has placed reliance on managers having regular updates with their teams. 
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to North Ayrshire’s overall
governance approach to child protection.    
4.2 No opinion has been formed on the detail included in procedures, briefing notes or the
accuracy of CPC findings as these are specialist in nature, and therefore outwith the
knowledge base of the Internal Audit Team. 
Agenda Item 9
109

Page 110

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
Agenda Item 9
110

Page 111

KEY FINDINGS AND ACTION PLAN
GOVERNANCE OF CHILD PROTECTION IN NORTH AYRSHIRE 
Action a
Finding There is no central storage location for child protection
procedures within HSCP.
Action Description Consideration should be given to creating a central ‘library’ of
procedures and guidance notes – accessible by all officers with a
role in child protection.
Risk Officers are unaware of procedures; officers are using an
outdated version of a procedure
Priority (1, 2, 3) 2
Paragraph Reference  3.9
Managed by Head of Service (Children, Families & Justice)
Assigned to Head of Service (Children, Families & Justice)
Due Date 22/12/25
Management Comment We are currently exploring the feasibility of establishing a
centralised repository to house all child protection policies and
guidelines, with the aim of enabling the workforce to access them
more efficiently and with greater ease. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
Agenda Item 9
111

Page 112

ACCOUNTS PAYABLE TRANSACTION TESTING 
1 Background  
1.1 This audit was conducted as part of the approved 2025/26 Internal Audit Plan and
used data analytics to interrogate the Accounts Payable (AP) system on Integra and
the procurement card system and examine any anomalies which arose.  
1.2 There were 4,672 active Trade Suppliers (for processing payments to standard
suppliers, individuals, and social services) and 931 Sundry Suppliers (for processing
one-off sundry payments) on Integra as at 8th May 2025.  
1.3 There were 100,708 invoices paid to trade and sundry suppliers from 1st July 2024 to
30th April 2025, totalling just over £354.4 million.  
1.4 There were 19,110 procurement card transactions made during the period of the audit
totalling just under £4.5 million.  The SDOL system is the Royal Bank of Scotland
Smart Data Online system used to record and manage procurement card transactions.    
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• duplicate suppliers are identified and de-activated to minimise the risk of
duplicate invoices being paid.
• duplicate invoices have not gone undetected.
• advance payments have been reported to Financial Management for the list of
pre-payments at financial year-end.
• high value invoices have been properly authorised.
• invoices paid to employees are bona fide.
• card purchases are in line with the policy and there is adequate separation of
duties.  
2.2 The audit period was 1st July 2024 to 30th April 2025.    
3 Findings   
Supplier Testing  
3.1 Testing was carried out to identify duplicate trade suppliers on Integra. Testing
identified 43 duplicate suppliers either by name or bank details. These were passed
to the AP team to review and deactivate as appropriate.  (action a)   
Invoice Testing  
3.2 The auditor tested for duplicate payments to suppliers, including sundry suppliers, and
identified possible duplicates that were investigated further. This check confirmed 126
were duplicates that had already been identified and action taken by the AP team by
either processing a reversal, keying a credit or requesting a BACS recall. This testing
identified a further 14 potential duplicate invoices totalling £162,301.71 which had not
already been identified by the AP team. The potential duplicates have been passed to
the AP team to check and arrange recovery.  (action b)  
Agenda Item 9
112

Page 113

3.3 The auditor tested for purchase orders that have been requisitioned and approved by
the same person and none were found. There were 2 users with requisitioner and
approver roles, but there was a separation of duties in all such cases. E-Procurement
has since confirmed the users no longer have both roles.  
3.4 There were 12 invoices paid before the invoice date and there were 285 invoices paid
more than 1 year after the invoice date. All were checked and there were no findings
to note. 
Advance Payment Testing  
3.5 The auditor extracted all payments over £20,000 and tested a sample of 50. There
were 26 invoices passed to Financial Management to confirm the payments have been
posted to the correct financial year end before the accounts are finalised.  The
remaining 24 were checked by the auditor and found to be correctly accounted for. 
Financial Management advised that an invoice totalling £57,217.50 was accrued in
error and a reversal was processed to correct it.   
High Value Payment Testing  
3.6 The auditor selected a sample of 10 invoices between £10,000 and £100,000. There
were 5 PO invoices and 5 non-PO invoices checked. There were 2 non-PO invoices
where the authorised signatory was copied into the email to AP for processing rather
than AP being provided with explicit approval from the authorised signatory.  (action
c)   
3.7 The auditor tested a sample of 20 invoices over £100,000.  There were 10 PO invoices
and 10 non-PO invoices checked. There were 2 non-PO invoices where the authorised
signatory was copied into the email to AP for processing rather than AP being provided
with explicit approval from the authorised signatory.  (action c)   
Payments to Employees Testing  
3.8 The auditor tested for sundry payments to employees. This testing found a £7,000
payment was made to an employee for an Alcohol and Drugs Partnership (ADP) grant
for 2024/25 instead of being paid to the Irvine Youth Legacy Centre. The employee
took corrective action the same day the money was received by transferring the £7,000
to the group’s bank account as evidenced by the bank statements provided. 
3.9 The auditor investigated the circumstances which resulted in such a payment being
made. The proper process was not followed by the ADP team within HSCP as the
sundry payment request form was sent to AP without any evidence of bank details.
AP contacted the (ADP) team to request the missing evidence. On receipt of the
evidence, AP did not carry out a check on bank details in line with their process, as
the payment was processed even though the bank details on the sundry payment
request form differed from the bank statement provided as evidence. If the ADP team
and the AP team had carried out checks on the bank details in line with their individual
processes, this error would have been avoided. (action d)  
3.10 The employee, who works in a different team within the HSCP and volunteers with this
group, was asked by the ADP team to complete the details of payment section on the
sundry payment request form which includes the bank details. The employee was
unable to explain why they completed their personal bank details instead of the groups
bank details. In addition, the employee did not notify the ADP team of this error and
the corrective action taken.
Agenda Item 9
113

Page 114

3.11 The Lead Officer (ADP) confirmed that the ADP team has been advised to return to
sending out a form for organisations to complete their bank details, which will be used
by the ADP team to complete the sundry payment request form independently of the
organisation.  
3.12 The auditor found an employee on sick leave with the Council but still receiving
payments as a supplier on Integra for providing a service. This has been passed to
the Service to investigate further. The Service has also been advised to take action to
ensure the employee’s declared interest is properly recorded in line with the Employee
Code of Conduct.   
Procurement Card Testing  
3.13 The procurement card report listed 19,110 transactions between 1 July 2024 and 30th
April 2025.  As at 13th May 2025, there were 142 card transactions totalling £11,966.95
that had not been reviewed or approved and there were 180 card transactions totalling
£15,017.23 that had been reviewed but not approved.  As per the procurement card
policy and procedure, all transactions must be reviewed and approved by 28th of each
month and must be checked 48 hours after to ensure all transactions are reviewed
and approved before the statement is paid.  (action e)  
3.14 The card transactions not reviewed and approved have been analysed by Service. 
Service
Number of
Cardholders
Number of
Card
Transactions
Communities & Housing 8 46
Corporate Service 3 5
Education 13 43
HSCP 14 37
Place 4 11
TOTALS 42 142 
The card transactions reviewed but not approved have been analysed by Service. 
Service
Number of
Cardholders
Number of
Card
Transactions
Communities & Housing 10 37
Corporate Service 1 1
Education 17 45
HSCP 15 92
Place 3 5
TOTALS 46 180 
3.15 There are 6 users that are cardholders and approvers, which agreed to the list held by
e-Procurement.  Transactions by users with this dual role were checked and there
were no findings to note.  There are small number of exceptions which require a user
to have dual roles and a valid reason for this needs to be provided.  
3.16 There were 3 transactions reviewed and approved by the same user although the
cardholder was different. E-Procurement confirmed that an email was sent to the user
Agenda Item 9
114

Page 115

reminding them that transactions should not be reviewed and approved by the same
person and there have been no further instances since the reminder email.  
3.17 The auditor tested for potential duplicate card transactions.  There was a duplicate
transaction for £244.12, and the cardholder is contacting the supplier to arrange a
refund. There was a duplicate transaction for £147.02, and the cardholder is liaising
with the supplier to arrange a refund.  
3.18 There were 7 cardholders with transactions above their single transaction limit when
compared to the user information report provided by e-Procurement. Further
investigation showed that the single transaction limit was higher on SDOL which meant
no transactions were made above the single transaction limit. However, the user
information report maintained by e-Procurement had not been updated when the
procurement card limit amendment e-form was received. E-Procurement has since
updated the e-form to include a checkbox to update the user information report to
reduce the risk of this happening again. 
3.19 There was a cardholder with 1 transaction above the e-Procurement single transaction
limit however when SDOL was checked we found that the user had an unlimited single
transaction limit, which is the default amount set by the Royal Bank of Scotland when
processing a card application (unless otherwise specified). This should have been
manually change by e-Procurement as part of the new cardholder process. Although
the single transaction limit was not changed at this time, the monthly limit was set to
£5,000. This was immediately rectified, and e-Procurement checked all single card
transaction limits on SDOL and confirmed that no other cardholder has an unlimited
limit.  
3.20 The auditor tested for instances of orders being split to bring the purchase below the
single transaction limit which is against the procurement card policy and procedure. 
The auditor found 9 instances where this has happened and related to 6 different
cardholders. The cardholders have been contacted and been advised to speak to their
line manager to review their single transaction limit or to request a temporary increase
to allow for the purchase of one-off high value orders. (action f)  
3.21 The auditor noted that £3,336.06 card transactions paid to Amazon were not
purchased via an Amazon Business account; however, Procurement advised that
Amazon monitors this and contacts users to request they join the Business account. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the controls around the
processing of invoices and card payments. Although a number of findings were
identified during the audit, the financial impact of these is not material when compared
to the total number and overall value of transactions.   
Agenda Item 9
115

Page 116

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
Agenda Item 9
116

Page 117

KEY FINDINGS AND ACTION PLAN
ACCOUNTS PAYABLE TRANSACTION TESTING 
Action a
Finding Testing was carried out to identify duplicate trade suppliers on
Integra. Testing identified 43 duplicate suppliers either by name
or bank details. These were passed to the AP team to review and
deactivate as appropriate.  
Action Description The AP team should review the list of duplicate suppliers and
deactivate suppliers as appropriate. The AP team should be
reminded to check if the supplier is already on the system before
they are added again.
Risk Duplicate invoices may be paid to the same supplier via different
supplier numbers.
Priority (1, 2, 3) 1
Paragraph Reference  3.1
Managed by Head of Service (People & ICT)
Assigned to Team Manager (Customer Services) 
Due Date 31/12/2025
Management Comment AP team will review the list and deactivate duplicate suppliers
identified. 
Action b
Finding Duplicate testing identified 14 potential duplicate invoices totalling
£162,301.71 which had not already been identified by the AP
team. The potential duplicates have been passed to the AP team
to check and arrange recovery.  
Action Description The AP team should review the potential duplicate payments and
arrange for recovery of monies paid twice.
Risk The Council has paid the same invoice twice and the money has
not been recovered.
Priority (1, 2, 3) 1
Paragraph Reference  3.2
Managed by Head of Service (People & ICT)
Assigned to Team Manager (Customer Services)
Due Date 28/02/2026
Management Comment AP team will review the list of duplicate invoices and take
necessary action to recover these from suppliers. 
Action c
Finding Approval testing found 4 non-PO invoices where the authorised
signatory was copied into the email to AP for processing rather
than AP being provided with explicit approval from the authorised
signatory.
Action Description AP should advise all approvers that they must specifically state
within the email to AP that they approve an invoice for payment.
The AP team should be advised only to accept emails with explicit
approval from the authorised signatory and should not accept
instances where the approver is copied into the email.
Risk Authorised signatory may not check email before payment is
made resulting in an unauthorised payment; lack of proper audit
trail for the approval of invoices.
Priority (1, 2, 3) 1
Paragraph Reference  3.6, 3.7
Agenda Item 9
117

Page 118

Managed by Head of Service (People & ICT)
Assigned to Senior Manager (Customer Services)
Due Date Complete
Management Comment AP have now implemented a new process which states that an
email must be sent directly from the approving manager
authorising payment. An email has been issued to all services
advising payment will not be processed until this has been
received. 
Action d
Finding The auditor investigated the circumstances which resulted in an
ADP grant being paid to an employee instead of being paid to the
Irvine Youth Legacy Centre, which the employee volunteers with. 
The proper process was not followed by the ADP team within
HSCP as the sundry payment request form was sent to AP
without any evidence of bank details. AP contacted the ADP team
to request the missing evidence. On receipt of the evidence, AP
did not carry out a check on bank details in line with their process,
as the payment was processed even though the bank details on
the sundry payment request form differed from the bank
statement provided as evidence. If the ADP team and the AP
team had carried out checks on the bank details in line with their
individual processes, this error would have been avoided.
Action Description The AP team should be reminded to check evidence of bank
details provided matches bank details on the sundry payment
request form.
Risk Payment is made to the incorrect recipient which may not be
recoverable.
Priority (1, 2, 3) 2
Paragraph Reference  3.9
Managed by Head of Service (People & ICT)
Assigned to Senior Manager (Customer Services)
Due Date Complete
Management Comment AP team have put in additional checks to tighten up this area and
ensure bank details are correct before payment is processed. 
Action e
Finding The procurement card report listed all transactions up to 30th April
2025.  As at 13th May 2025, there were 132 card transactions
totalling £11,966.95 that had not been reviewed or approved and
there were 174 card transactions totalling £15,017.23 that had
been reviewed but not approved.  As per the procurement card
policy and procedure, all transactions must be reviewed and
approved by 28th of each month and must be checked 48 hours
after to ensure all transactions are reviewed and approved before
the statement is paid.  
Action Description Cardholders and approvers should be reminded to review and
approve transactions by the 28th of each month in line with the
Procurement Card Policy and Procedure. There should be an
escalation process in place if transactions continue not to be
reviewed and approved.
Risk Purchases are paid before they have been reviewed and
approved. Delayed transfer of transactions to the general ledger
which impacts budget monitoring.
Agenda Item 9
118

Page 119

Priority (1, 2, 3) 2
Paragraph Reference  3.13
Managed by Head of Service (People & ICT)
Assigned to Senior Manager (Customer Services)
Due Date Complete
Management Comment A system generated email is currently issued 3 times per week to
all SDOL users to remind them to review and approved
transactions.   A quarterly report is issued to Senior Managers
which highlights those that are outstanding for action.  Emails
issued advise that access will be removed from users who are
persistently late in reviewing / approving.   
Action f
Finding The auditor tested for instances of orders being split to bring the
purchase below the single transaction limit which is against the
procurement card policy and procedure.  The auditor found 9
instances where this has happened and related to 6 different
cardholders. The cardholders have been contacted and been
advised to speak to their line manager to review their single
transaction limit or to request a temporary increase to allow for
the purchase of one-off high value orders. 
Action Description e-Procurement should issue a reminder to cardholders that
transactions should not split to bring the purchase below the
single transaction limit which is against the procurement card
policy and procedure. If such cardholders need the single limit to
be amended, the cardholder should complete the amend a limit
form and get the appropriate approval for such a change.
Risk Non-compliance with the procurement card policy and procedure;
circumventing authorised limit. 
Priority (1, 2, 3) 2
Paragraph Reference  3.20
Managed by Head of Service (People & ICT)
Assigned to Senior Manager (Customer Services)
Due Date Complete
Management Comment Further to the last audit where this same issue was picked up and
an email issued to users to remind them that this is against the
policy, another reminder email has been issued. Staff across
services are responsible for ensuring that they comply with the
policy. 
Agenda Item 9
119

Page 120

Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
Agenda Item 9
120