Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee
A Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
will be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Tuesday, 23 September 2025 at 10:00 to consider the undernoted
business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Annual Assurance Statement to the Scottish Housing Regulator
2024/25
Submit report by the Executive Director (Communities and Housing)
advising of the Council’s Annual Return on the Charter 2024/25
submission and to seek approval for its submission to the Scottish
Housing Regulator (copy enclosed).
3 Our Council Plan Year End Progress Reporting including LGBF
Analysis
Submit report by the Head of Service (Democratic) on Our Council Plan
Year End Reporting including LGBF Analysis (copy enclosed).
4 External Audit Report on the 2024/25 Audit
Submit report by the Head of Service (Finance) inviting the Committee to
note the Annual Audit report for 2024/25 and to consider the verbal report
by the external auditor (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee Sederunt
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney
Chair:
Apologies:
Attending:
3

Page 4

4

Page 5

NORTH AYRSHIRE COUNCIL 
23 September 2025 
Audit & Scrutiny Committee 
Title: Annual Assurance Statement to the Scottish Housing
Regulator 2024/25 
Purpose: To advise the Committee of the Council’s Annual Return on the
Charter 2024/25 submission and to seek approval for its
submission to the Scottish Housing Regulator. 
Recommendation: That the Committee: (i) notes the Annual Return on the Charter
submission 2024/25; (ii) notes the supporting evidence provided
to demonstrate compliance with the regulatory framework and
relevant legislation; (iii) notes the Council’s areas of non-
compliance detailed at paragraphs 2.26-2.30; (iv) notes the
amendments which have been made to the Annual Return on
the Charter 2023/24 and submitted to the Scottish Housing
Regulator; and (v) authorises the Chair to sign the Annual
Assurance Statement 2024/25 at Appendix 1 for submission to
the Scottish Housing Regulator. 
1. Executive Summary
1.1 The Scottish Housing Regulator’s framework for the regulation of social housing in
Scotland includes the requirement for an Annual Assurance Statement to be submitted
alongside the Annual Return on the Charter (ARC). The Statement must be approved
by the appropriate Committee within the organisation, prior to submission to the
Scottish Housing Regulator (SHR) by 31 October of each year. A copy of this year’s
statement is provided at Appendix 1.
1.2 The 2024/2025 ARC was submitted to the Regulator on 30 May 2025. This committee
report provides information on the performance reported in the ARC 2024/25,
highlighting areas of high or improving performance, areas requiring improvement, and
areas of non-compliance. The report also provides information at Appendix 2 on how
the Council gains assurance that it is compliant with the regulatory framework. 
1.3 Endorsement of the Annual Assurance Statement 2024/25 will ensure that the Council
complies with regulatory requirements set out in the Housing (Scotland) Act 2010. 
1.4 The Annual Assurance Statement 2023/24 report, presented to Audit and Scrutiny
Committee on 31 October 2024, advised that Housing Services had recently
commissioned an independent consultant to validate the 2023/ 24 ARC submission
Agenda Item 2
5

Page 6

and enable any improvements to data collection and reporting to be addressed prior to
the preparation of the 2024/25 ARC. 
1.5 The external validation exercise was undertaken in October 2024 and concentrated
on 17 key indicators. The Council’s Internal Audit Service was requested to undertake
further validation on some of the remaining indicators. This audit was completed in
March 2025 and concentrated on five indicators. As a final measure, a further analysis
of the technical guidance was undertaken during the 2024/2025 ARC process, which
highlighted some additional changes to the 2023/2024 indicators. 
1.6 The findings from the internal and external validation work showed that North Ayrshire
Council required to restate 15 indicators for 2023/2024, using the SHR Data Correction
Policy. Appendix 3 details the 2023/24 indicators which required to be amended and
submitted to the SHR, along with an explanation of the backround and corrective action
which has been implemented. As a measure of good practice Housing Services are
currently taking steps to further strengthen their processes around the ARC. 
1.7 In October 2024, the Regulator was advised that a validation exercise was being
undertaken and that any corrections would be reported in due course. A further
update was provided by the Head of Service at a meeting with the Regulator on 11
June 2025, prior to the data corrections being formally submitted on 28 August 2025.
2. Background 
2.1 The Housing (Scotland) Act 2010 sets out the statutory objectives, functions, duties,
and powers of the SHR, a non-ministerial department responsible for regulating social
housing in Scotland. 
2.2 In 2012, the Scottish Government’s Social Housing Charter was established. It sets
out the standards and outcomes that tenants, homeless people, homeowners, and
gypsy/travellers can expect from social landlords. This is monitored via landlords’
Annual Return on the Charter submissions to the SHR.
2.3 In February 2019, the Scottish Housing Regulator issued a revised framework for the
regulation of social housing in Scotland. The new framework includes the requirement
for landlords to submit an Annual Assurance Statement which has been agreed by a
Board or Committee within the organisation. The Council must provide assurance that it
complies with the relevant requirements of Chapter 3 of the Regulatory Framework. 
2.4 The Annual Assurance Statement is confirmation that, as a landlord, the Council: 
• meets all legal duties and responsibilities, and adheres to relevant guidance and
the requirements of other regulators
• meets its statutory duties to prevent and alleviate homelessness
• adheres to statutory guidance from the Scottish Housing Regulator
• takes account of regulatory advice from the Scottish Housing Regulator and from
other regulators
• complies with all regulatory requirements
6

Page 7

The Council must also confirm plans to address any instances where there is a
material non-compliance and notify the SHR about any material changes in their level
of assurance during the year. 
2.5 North Ayrshire Council’s ARC 2024/25 was submitted to the SHR on 30 May 2025.
The return provides details of the Council’s performance across a range of indicators
within the Charter outcomes. Prior to submission of the ARC, a meeting was held on
27 May 2025 with the North Ayrshire Network (NAN), which is our tenant group with
representation from local Tenants and Residents Associations (TARAs). At the
meeting a range of indicators were discussed, with information on levels of
performance and a comparison with 2023/24 data provided to the NAN members. 
2.6 The SHR requires landlords to provide assurance in their Statement that they have
developed an effective approach to the collection of equalities information and that
they have considered how they can adopt a human rights approach in their work. 
2.7 As a landlord, North Ayrshire Council collects data relating to each of the protected
characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who are at risk of homelessness and service users on
our Gypsy/ Traveller site. A systems review is currently being undertaken alongside
our partner landlords within the North Ayrshire Housing Register, which incorporates
further development of our approach to collation of equalities data within the brief for
the review. 
2.8 Access to good quality housing is recognised as a basic human right and providing
this to everyone in North Ayrshire is a key priority, including ensuring accommodation
is provided to homeless households, tenancy sustainment, a dedicated site to meet
the needs of Gypsy/ Travellers, standards of Council-owned accommodation are well
maintained and continuing to deliver our new house building programme. 
Performance 
2.9 The Scottish Housing Regulator published their National Report on social landlords’
performance against the standards and outcomes of the Scottish Social Housing
Charter for 2024/25 on 29 August 2025. Initial analysis of the 2024/25 national
performance information shows that North Ayrshire Council remains a high performing
local authority housing service. Of the 35 indicators reported in 2024/25, ranked against
other Scottish local authorities North Ayrshire is in: 
• The top quartile for 17 indicators (49%)
• The second quartile for 7 indicators (20%)
• The third quartile for 3 indicators (9%)
• The bottom quartile for 8 indicators (22%)
2.10 Performance against each of the indicators is being scrutinised to enable plans to be
developed to sustain areas of high performance and address areas for improvement. 
2.11 Housing Services has a well-developed Performance Management Framework in
place, which ensures the monthly scrutiny of performance information with regards to
the SHR/ ARC, Council Plan and other key performance-related data.
7

Page 8

2.12 In addition, the Housing Transformation Board continues to monitor improvement
workstreams to increase performance in areas such as rent arrears, aids and
adaptations, voids management, the housing repairs policy and homelessness
prevention. 
2.13 The information provided below identifies key areas of high or improving performance
as reported in our ARC return for 2024/25, alongside areas where there has been a
decline, or where improvement is required. 
Areas of high or improving performance 
2.14 Tenant satisfaction has improved in terms of our overall services as a landlord (91.8%
in 2024/25 vs 88.7% in 2021), tenants feeling we are good at keeping them informed
about our services and decisions (86.8% in 2024/25 vs 85.5% in 2021), and remains
high in relation to opportunities given to tenants to participate in decisions (89.7% vs
91.9% 2023/24). Performance in this area is based on our tri-annual tenant satisfaction
survey, which took place during 2024/25 to provide an updated position for the 2024/25
ARC submission. 
2.15 The average length of time taken to complete non-emergency repairs decreased from
6.76 days in 2023/24 to 6.60 days and is below the Council’s 7-day average target.
The increase in performance is mainly due to the introduction of a new ‘handyman’
multi-trade role which allows Building Services to complete a higher volume of routine
multi-trade jobs more quickly and create capacity for qualified operatives to undertake
more complex, trade-specific works. Our policies and processes in relation to repairs
and maintenance are an area of focus within the Housing transformation programme. 
2.16 There has been a significant improvement in performance relating to adaptations
work, with the number of households waiting for an adaptation to their home decreasing
from 302 on 31 March 2024 to 232 on 31 March 2025. The average number of days to
complete an approved adaptation also decreased significantly, from
90.08 days in 2023/24 to 57.25 days in 2024/25. As part of the transformation
programme, a joint improvement group, with representation from the Health and Social
Care Partnership, Housing, Building Services and Property Management and
Investment, continues to review demand for adapted properties, alongside existing
processes, to ensure the best possible service outcome for tenants and best value for
their rent. 
2.17 The average time taken to re-let properties decreased from 31.93 days in 2023/24 to
27.89 days in 2024/25. Void performance continues to be impacted by delays in
resolving meter issues with utility suppliers. This matter has been recognised nationally
and has been escalated to the Scottish Government for action. Notwithstanding the
improvement in void performance, Housing Services are currently working closely with
Building Services to review the current void processes, as part of the Housing
Transformation Board work programme. The aim of the workstream is to ensure the
delivery of an effective and efficient service that not only creates efficiencies but also
assists in futureproofing the housing stock by increasing the number of accessible
homes across North Ayrshire. 
2.18 The number of court actions resulting in eviction increased from 11.22% in 2023/24 to
13.37% in 2024/25. Of the 172 court actions resulting in 23 evictions in 2024/25, 21
were due to rent arrears and two were due to antisocial behaviour.
8

Page 9

Areas with a decline in performance or requiring improvement 
2.19 The average length of time taken to complete emergency repairs increased from 2.29
hours in 2023/24 to 2.72 hours in 2024/25. Despite the slight decrease in performance,
we continue to out-perform our four-hour target for emergencies, as set out in North
Ayrshire Council’s Housing Repairs Policy. 
2.20 The percentage of antisocial behaviour cases resolved during 2024/25 was 85.65%, a
slight decrease against last year’s performance of 86.50%. However, our performance
against locally agreed targets is 96.3% of cases resolved within agreed timescales,
which exceeds the target of 94%. 
2.21 Satisfaction levels of tenants who had repairs or maintenance carried out in the last
12 months has decreased from 97.51% to 86.78% since 2023/24. This is based on
1,490 responses received during 2024/25. Since September 2023, tenants have been
able to complete a satisfaction survey in real time on the tradesperson’s electronic
device. Work is continuing to ascertain the most appropriate method of collating this
performance information to support continuous improvement in the number of
responses received. 
2.22 Gross rent arrears as a percentage of rent due increased from 7.48% in 2023/24 to
8.03% in 2024/25. Rent arrears continue to remain a focus for Housing Services and is
a priority workstream for the Housing Transformation Board, which is overseeing work
to prepare a new Income Collection Strategy. Housing Operations staff follow the
Council’s arrears escalation process to recover rent arrears where possible, and
proceed with court action for rent arrears over £2,250. Dedicated housing support and
welfare rights teams are in place to help maximise income for tenants. The teams
continue to prioritise prevention, early intervention and take a person-centred approach
to arrears management, recognising the financial challenges many tenants are facing.
Our overall performance in relation to rent arrears is monitored by the Housing
Services leadership team on a monthly basis, with detailed information provided at a
local housing office/ patch level. 
2.23 Approaches for homeless assistance in North Ayrshire increased by 8.29% in 2024/25
compared to the previous year. The national performance statistics published annually
by the Scottish Government highlight that homelessness is at the highest level
nationally since 2011/12, with the number of open homelessness applications and
households in temporary accommodation reaching the highest on record. The main
reason for homelessness in North Ayrshire during 2024/25 was as a result of a
relationship breakdown, accounting for 266 approaches (22.47%). This is followed by
people being asked to leave the family home, which accounted for 217 (18.33%)
approaches. 
2.24 Whilst there is increasing pressure on the housing system locally in North Ayrshire, a
range of measures are in place to respond to this, including increasing housing supply
through new builds and acquisitions, ensuring our void properties are turned around as
quickly as possible for re-let, and managing housing demand from homeless people
through our supply of temporary and permanent accommodation. The service delivery
model within Housing Operations/Homelessness Services was revised in May 2024 to
enable prevention activities to be undertaken at a locality level, with newly integrated
teams working to identify and address service priorities within each locality.
9

Page 10

This approach ensures that there is a joined-up response to tenants and residents by
resolving any issues as they arise at a local level. The Council’s Homelessness Task
Force comprises of a range of internal and partner stakeholders who are working
together to analyse a range of available datasets to understand the changing
dynamics of the homelessness system and associated risk factors. The work of the
Task Force includes preparation of a new Homelessness Prevention Strategy, which
will consider all levers at partners’ disposal to balance the homelessness system, and
will be aligned to the Housing (Scotland) Bill 2024. 
2.25 The percentage of tenancy offers refused during the year increased slightly from
42.45% to 43.45%. This is largely attributable to an increase in refusals from tenants
on the housing waiting list who have an identified accessible housing need and are
looking to transfer from an existing tenancy. The Council and its Common Housing
Register partner landlords do not impose any penalties on applicants for refusing offers
of housing that are made via the North Ayrshire Housing Allocation Policy. This may
have led to applicants receiving multiple offers of housing and refusals being made,
therefore the headline decline in performance may not be a true reflection. A further
contributory factor to the increase in refusals may be that applicants have expectations
of being housed or re-housed in our new build developments. We intend to review our
Suspension Policy as part of the future work programme associated with the
forthcoming revised Allocations Policy which will be considered by Cabinet on 30
September 2025. 
Area of non-compliance 
2.26 Similar to 2023/24, our two areas of non-compliance relate to gas safety and Electrical
Installation Condition Reporting (EICR). In early 2023, a cross-service working group
was established to address performance in this area. An improvement plan was
developed and implemented, which has delivered a sustained increase in performance.
However, our target is 100% compliance, and efforts are ongoing to close the small
remaining gap. As part of our improvement plan, a dedicated Compliance Team within
PMI was created in 2023, supported by additional resources. An update on gas safety
and EICR is provided below. 
Gas Safety 
2.27 During 2024/25, one property did not receive its annual gas safety check within the
statutory timescales (compared to 106 in 2022/23 and 25 in 2023/24). The omission in
2024/25 was due to a system administration error, where the property was erroneously
removed from the database following demolition of a neighbouring block. 
2.28 All efforts were made to ensure compliance at the earliest opportunity and appropriate
records were kept. The one property which failed its 12-month compliance check
during 2024/25 was completed by 31 March 2025. During 2025/26 to date, no failures
have been recorded. 
Electrical Testing 
2.29 At the end of 2024/25, 305 properties were non-compliant due to not having an EICR
certificate in place, representing 2.27% of our total housing stock. The Council’s access
policy was extended in August 2023 to enable electrical inspections to be
10

Page 11

undertaken, similar to the arrangements already in place for gas compliance checks
which has assisted in improving performance in that area. 
2.30 All efforts were made to ensure electrical safety compliance at the earliest opportunity
and appropriate records were kept; officers have assessed this a material non-
compliance and the SHR was informed during 2024/25 of the expected outcome.
Property Management and Investment have been providing monthly updates to the
SHR in relation to both gas and electrical safety compliance since January 2023. For
2025/26, the EICR compliance figure as at end June 2025 was 98.21%. 
2023/24 ARC data validation 
2.31 The Annual Assurance Statement 2023/24 report, presented to Audit and Scrutiny
Committee on 31 October 2024, advised that Housing Services had recently
commissioned an independent consultant to validate the 2023/ 24 ARC submission
and enable any improvements to data collection and reporting to be addressed prior
to the preparation of the 2024/25 ARC. 
2.32 The external validation exercise was undertaken in October 2024 and concentrated
on 17 key indicators. The Council’s Internal Audit Service was requested to undertake
further validation on some of the remaining indicators. This audit was completed in
March 2025 and concentrated on five indicators. As a final measure, a further analysis
of the technical guidance was undertaken during the 2024/2025 ARC process, which
highlighted some additional changes to the 2023/2024 indicators. 
2.33 The findings from the internal and external validation work showed that North Ayrshire
Council required to restate 15 indicators for 2023/2024, using the SHR Data Correction
Policy. Appendix 3 details the 2023/24 indicators which have been amended and
submitted to the SHR, and includes explanations and corrective actions taken. 
2.34 In October 2024, the Regulator was advised that a validation exercise was being
undertaken and that any corrections would be reported in due course. A further
update was provided by the Head of Service at a meeting with the Regulator on 11
June 2025, prior to the data corrections being formally submitted on 28 August 2025. 
2.35 As a measure of good practice Housing Services are currently taking steps to further
strengthen their processes around the ARC, including: 
• Preparation of clear and prescriptive data for all indicators within the ARC
• Monthly monitoring and validation of indicators
• Procurement of external support to carry out a ‘level one’ desktop ARC
validationexercise, with a full ARC validation every three to five years. 
2.36 Housing Services has a long established and strong performance culture. The
validation work that has been undertaken during 2024/25 reflects a spirit of continuous
improvement and self-assessment, aligned to the SHR’s Regulatory Framework. 
Assurance 
2.37 The overall performance of the Housing Service is continuously reviewed by the Head
of Service and Housing Senior Management Team on a monthly basis, with key
11

Page 12

performance information and action plans presented to the North Ayrshire Network,
Housing Business Plan Group and Council’s Cabinet regularly during each year. 
2.38 Several ARC indicators also form part of the corporate performance monitoring
framework, scrutinised by Chief Officers and elected members. 
2.39 The Scottish Federation of Housing Associations (SFHA) Self Assurance Toolkit has
also been utilised as a further method of self-assessment. The toolkit provides
guidance to social landlords on gathering evidence to demonstrate compliance with
regulatory requirements and standard and focuses on questions that governing bodies
should ask to gain assurance that this is being achieved. 
2.40 The ARC 2024/25, which can be accessed at North Ayrshire Council | Scottish
Housing Regulator demonstrates the Council’s performance against the outcomes in
the Scottish Social Housing Charter. 
2.41 Supporting evidence to demonstrate compliance with the regulatory framework and
relevant legislation is attached at Appendix 2. 
2.42 The Annual Assurance Statement, which is attached at Appendix 1, confirms that the
Council has complied with the regulatory framework, all standards, and outcomes. It
highlights North Ayrshire’s non-compliance with our legal responsibilities around gas
and electrical safety. It also confirms the equalities data currently captured, and how
North Ayrshire adopts a human rights approach in our work. This Statement will be
made available to tenants as part of the Council’s performance reporting process. 
3. Proposals 
3.1 It is proposed that the Committee (i) notes the Annual Return on the Charter
submission 2024/25; (ii) notes the supporting evidence provided to demonstrate
compliance with the regulatory framework and relevant legislation; (iii) notes the
Council’s areas of non-compliance detailed at paragraphs 2.24-28; (iv) notes the
amendments which have been made to the Annual Return on the Charter 2023/24 and
submitted to the Scottish Housing Regulator; and (v) authorises the Chair to sign the
Annual Assurance Statement at Appendix 1 for submission to the Scottish Housing
Regulator. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 Approval of the Annual Return on the Charter submission 2024/25 and supporting
evidence, and signature of the Annual Assurance Statement, will ensure that the
12

Page 13

Council complies with regulatory requirements set out in the Housing (Scotland) Act
2010. 
Equality/Socio-economic 
4.4 As a landlord, data is collated relating to each of the protected characteristics for
existing tenants, new tenants, people on waiting lists, governing body members, staff,
people who apply to us as homeless and service users on our Gypsy/Traveller site.
This data is used to inform decision making, policy making and day to day service
delivery. 
Climate Change and Carbon
4.5 None. 
Key Priorities 
4.6 The matters referred to in this report contribute to all four of the Council Plan priorities;
Wellbeing, Climate Change, A Sustainable Council and Communities and Local
Democracy by ensuring our housing stock is well maintained, energy efficient and
compliant with all statutory duties. Housing Services ensure matters relating to housing
stock investment and compliance are consulted with and reported to our North Ayrshire
Network (NAN) tenants group and other affected services. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Consultation has taken place with tenant representatives, and relevant senior officers
within: Housing and Public Protection; Sustainability, Transport and Corporate
Property; Corporate Performance; Health and Social Care Partnership; and the
Scottish Housing Regulator during the preparation of the Annual Return on the
Charter and Annual Assurance Statement. 
David W. Hammond
Executive Director (Communities & Housing) 
For further information please contact Yvonne Baulk, Head of Service (Housing and
Public Protection), on 01294 324542. 
13

Page 14

Background Papers
Appendix 1: North Ayrshire Council Annual Assurance Statement 2024/25 (unsigned)
Appendix 2: Supporting evidence document 2024/25
Appendix 3: Data corrections spreadsheet - North Ayrshire Council - 2023/24 
14

Page 15

Appendix 1 
North Ayrshire Council
Annual Assurance Statement 
2024/25 
North Ayrshire Council complies with the requirements set out in Chapter 3 of the
Regulatory Framework. North Ayrshire Council is assured that we:
 Adhere to relevant guidance and the requirements of other regulators
 Meet our statutory duties to prevent and alleviate homelessness
 Adhere to statutory guidance from the Scottish Housing Regulator
 Take account of regulatory advice from the Scottish Housing Regulator and from
other regulators
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance. 
We did not meet our legal obligations around tenant and resident safety as we did not
comply with gas safety legislation for one property, and electrical testing for 305
properties during 2024/25.  The most significant challenge during 2024/25 has been
gaining access to properties to carry out statutory compliance works.  All efforts were
made to ensure compliance at the earliest opportunity and appropriate records were
kept. The Scottish Housing Regulator was notified of this expected outcome at the
earliest opportunity and was provided with monthly updates during 2024/25. 
As a landlord, we collect data relating to protected characteristics for existing tenants,
new tenants, people on waiting lists, governing body members, staff, people who apply
to us as homeless and service users on our Gypsy/Traveller site.  A systems review
is currently being undertaken alongside our partner landlords within the North Ayrshire
Housing Register, which incorporates further development of our approach to collation
of equalities data within the brief for the review.  We recognise that the right to housing
is a human right and providing this to everyone in North Ayrshire is of the highest
priority with work already taking place across a range of activities. 
North Ayrshire Council’s Audit and Scrutiny Committee has considered sufficient
evidence to give this assurance.  The Annual Assurance Statement was approved by
Audit and Scrutiny Committee on 23 September 2025. 
Authorised by: ________________________ 
Chairperson of the Committee 
Printed name:  ________________________ 
Date:   ________________________
15

Page 16

Appendix 2 
North Ayrshire Council
Housing Services 
Annual Assurance Statement
2024/25 
Supporting Evidence
September 2025
16

Page 17

Appendix 2 
Introduction 
In February 2019, the Scottish Housing Regulator (SHR) issued a revised framework for the regulation of social housing in Scotland. The new
framework includes the requirement for landlords to submit an Annual Assurance Statement which has been agreed by a Board or Committee within
the organisation. We must provide assurance that the organisation complies with the relevant requirements of Chapter 3 of the Regulatory Framework. 
This document provides evidence to support our Statement that North Ayrshire Council is assured that we:
 Adhere to relevant guidance and the requirements of other regulators;
 Meet our statutory duties to prevent and alleviate homelessness;
 Adhere to statutory guidance from the Scottish Housing Regulator;
 Take account of regulatory advice from the Scottish Housing Regulator and from other regulators; and
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Tenant and resident safety
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance. 
As a landlord, we are also required to meet all legal duties and responsibilities. During 2024/25 we were unable to do this, as some properties did not
have an annual gas safety check carried out or an electrical safety certificate in place within the legal timescales due primarily to issues in gaining
access to tenants’ homes. We have provided information on this non-compliance in our Annual Assurance Statement and further detail in this
supporting evidence. 
The Scottish Housing Regulator contacted all local authorities and RSLs in March 2025 to ask landlords to continue to include further assurance
around tenant and resident safety in their 2024/25 Annual Assurance Statement, in particular:
• Gas safety
• Electrical safety
• Water safety
• Fire safety
• Asbestos
• Dampness and mould
• Lift safety 
17

Page 18

Appendix 2 
In January 2025, the Scottish Housing Regulator published new indicators on fire and electrical safety and damp and mould which landlords will be
required to submit by the end of May 2026 as part of the ARC submission. Measures have been put in place to ensure we are collating this additional
information to inform the ARC return as required. 
The Scottish Housing Regulator has requested that landlords provide assurance in their Statement that they have appropriate plans to implement an
effective approach to the collection of equalities information and that they have started to consider how they can adopt a human rights approach in
their work. 
Regulatory Requirements 
Assurance and notification
We prepare an Annual Assurance Statement in accordance with guidance and submit it to the Scottish Housing Regulator (SHR) annually. The
statement is available to tenants and other service users. We will notify the SHR during the year of any material changes to our assurance as set out
in the Statement. 
We can evidence that we meet all legal obligations associated with housing and homelessness services, and equality and human rights. 
We have not met our legal obligations around tenant and resident safety as we did not comply with gas safety legislation for one property during
2024/25. Due to new legislation introduced during 2021/22 regarding electrical testing, 305 properties were non-compliant with regards to having an
electrical installation condition report (EICR) in place during 2024/25. There continues to be an ongoing reluctance by some tenants to grant access
to their property; this is an issue we are working to address alongside system issues. In early 2023, a cross-service working group was established
to address our performance in this area. An improvement plan was developed and implemented which has delivered a sustained increase in
performance from 2022/23 and 2023/24. As part of our improvement plan, a dedicated Compliance Team within PMI was created in 2023, supported
by additional resources. We have considered this a material non-compliance and informed the SHR during 2024/25 of this expected outcome and
continued to provide them with monthly updates. 
We notify the SHR of any tenant and resident safety matters involving the Health and Safety Executive or reports from other regulatory bodies relating
to safety concerns. There were no issues to report during 2024/25. 
‘Customer Connections,’ our Customer Participation Strategy, is available to tenants and service users on the Council website. 
Customer Connections Strategy (north-ayrshire.gov.uk) 
Tenant and service user redress
Information on how to report any concerns around significant performance failures is available to tenants. Further information is contained in the
Scottish Housing Regulator leaflet. 
18

Page 19

Appendix 2 
North Ayrshire Council’s Complaints Handling Procedure is readily available to tenants and other service users.  It sets out the information they need
to exercise their right to complain and seek redress. Responses are provided within timescales set out in the procedure, in accordance with guidance
from the Scottish Public Services Ombudsman (SPSO). We have mechanisms in place to learn from complaints and other tenant and service user
feedback, in accordance with SPSO guidance. 
Whistleblowing
North Ayrshire Council has a policy and procedure in line with the Public Interest Disclosure Act 1998 for whistleblowing by staff and elected members.
This is readily available on the Council website and promoted through staff bulletins.   
Equalities and human rights
Equality is one of North Ayrshire Council's core values.  The principles of equality and fairness are central to all council activities. Our Equality and
Children’s Rights Impact Assessment process for all policies, procedures and proposals ensures we meet legislative requirements. All decisions made
by the Council’s committees include an assessment of equalities implications. 
As a landlord, we collect data relating to each of the protected characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who apply to us as homeless and service users on our Gypsy/Traveller site. We use this data to inform decision making,
policy making and day to day service delivery. We provide a diverse range of services, and we want to ensure everyone has the same opportunity to
access services and that they meet the needs and value the diversity for all our customers. We are currently undergoing a system review alongside
our partner landlords within the North Ayrshire Housing Register and have incorporated equalities data into the brief to further develop our approach. 
We recognise that access to good quality housing is a basic human right and providing this to everyone in North Ayrshire is of the highest priority.
Work already takes place across a range of activities: ensuring that accommodation is provided to homeless households when needed; housing
support services are provided to council tenants and homeless households to help sustain tenancies; there is a dedicated site to meet the needs of
Gypsy/ Travellers; standards of Council-owned accommodation are well maintained and align to the Scottish Housing Quality Standard (SHQS); and
we carry out adaptations to properties to make them more accessible for households with disabilities. 
Scottish Social Housing Charter Performance
We submit an Annual Return on the Charter to the Scottish Housing Regulator annually in accordance with published guidance. We have agreed our
approach to this through the North Ayrshire Network (NAN), a group of representatives from the various Registered Tenant Organisations in North
Ayrshire. You can read about our approach in ‘Customer Connections,’ our Customer Participation Strategy 2023 - 2028. 
Each year, we report on performance in our autumn edition of Tenancy Matters. The NAN work with us to agree the content of the report, which
includes comparisons with previous years, other landlords and national performance. Within this report we identify how we will address areas for
improvement and ask for feedback on our approach. 
19

Page 20

Appendix 2 
Standard 1 – The customer / landlord relationship 
Outcomes: 
Equalities 
We promote equality and embrace diversity in all parts of Housing Services. All the information we produce is in line with the Council’s Communications
Strategy. All leaflets, and a number of documents, are published in plain English and can be made available in large print, braille, tape, or CD, and
can be translated on request. 
Communication 
Housing Services provide a comprehensive range of information which is made available in leaflets, on the Council website and on social media. The
Tenant Editorial Panel approves all leaflets prior to issue to ensure they are fit for purpose and easy to understand. Our ‘tenant approved’ logo shows
tenants have endorsed our publications. In recent years we have developed a social media profile through Facebook and Twitter to encourage digital
engagement with a wider and more diverse customer base. 
We commission an independent organisation to undertake a tenant satisfaction survey at least every three years. The results of these surveys help
us to focus our efforts in improving communication and participation and understand what is important to our customers. Our last took place during
quarter three of 2024/25. 
Participation 
The North Ayrshire Network (NAN) has responsibility for ensuring that we continually improve the way we deliver services to tenants and customers.
Part of their role is to challenge our performance against the indicators, outcomes, and standards in the Charter. To do this, Housing Services report
to the Network through presenting on performance both mid-year and prior to submitting the Charter annually, working together on developing our
annual report to tenants and communicating any changes from the Scottish Housing Regulator directly to the group. A recent review of the NAN’s
membership has successfully resulted in an equalities-led approach to recruitment and representation of North Ayrshire’s communities. 
We are committed to tenant-led scrutiny of housing services to ensure that we continue to meet our tenants' needs and aspirations. Each year our
Tenant Inspection Panel identify one service area to scrutinise and independently review performance, policy and processes and customer experience
with support from Officers. Scrutiny provides an opportunity for tenants to drive improvement in the services most important to them. 
We have reviewed/ relaunched our Customer Participation Strategy for 2023 - 28 which encompasses the requirements of the Scottish Social Housing
Charter and relevant Council Plan priorities. Collectively these three documents emphasise the importance of supporting our communities’ tenants
and residents to grow and develop opportunities for active engagement and participation for all citizens by listening to local needs and aspirations. 
20

Page 21

Appendix 2 
Alongside developing the Customer Participation Strategy 2023 – 28 we received gold level accreditation from Tenant Information Service (TIS
Scotland) in August 2022 for Excellence in Scrutiny and Charter Performance for 2023 –25. In addition, we received gold level re-accreditation from
Tenant Participation Advisory Service (TPAS Scotland) in November 2022 for Excellence in Tenant Participation for 2023 - 25. 
Our latest tenant satisfaction survey told us that opportunities to take part in decision-making processes has fallen slightly to 90%, from 92% in 2021
but remains high in comparison to the council housing average of 82% (Knowledge Partnership 2025). The survey found that 9% of survey
respondents would prefer to participate and share their views via survey, whereas 77% have stated they are not interested in tenant participation
activities. This will be addressed through the delivery of the Customer Participation Strategy, by reviewing our tenant participation structures through
an equalities-led approach to increase participation and satisfaction. 
Standard 2 – Housing quality and maintenance 
Outcomes: 
Quality of housing 
Our housing stock is in very good condition and is well maintained. We take a proactive approach to housing asset management and target
improvements to ensure that our properties are SHQS and EESSH compliant. Properties are refurbished to ensure they remain attractive, meet
energy efficiency targets, meet modern requirements, and tenant expectations. We have a range of planned maintenance programmes which are
designed to: optimise investment by replacing major element components before they would otherwise require responsive repairs; anticipate changes
in minimum acceptable standards; reduce future requirements for cyclical maintenance; and future proof properties to ensure sustainability measures
being introduced can be met.   
A self-assessment of asset management processes and data has been undertaken to develop our approach. This is to enable the delivery of the
Housing Asset Management Plan (HAMP) and takes cognisance of the recommended practice on Integrated Asset Management published by the
Scottish Housing Regulator (SHR) in February 2023. The workstream is reported to the Housing Asset Management Board and has an action plan
developed and monitored to ensure delivery. Alongside property lifecycle data, the outcomes from the action plan will inform future capital investment
needs and identify properties where investment required is not economically viable and other solutions may be preferable, such as demolition. 
We have not met our legal obligations around tenant and resident safety during 2024/25 as we did not comply with gas safety legislation for one
property. Due to new legislation introduced during 2021/22 regarding the frequency of electrical testing and the installation of smoke detection
equipment, 305 properties were non-compliant with regards to having an up-to-date EICR during 2024/25. There continues to be an ongoing
reluctance by some tenants to grant access to their property; this is an issue we are working to address alongside system issues. Additional contracts
were put in place to try and achieve this by the date given, however supply chain and labour shortages for contractors have also impacted the
21

Page 22

Appendix 2 
programme. In early 2023, a cross-service working group was established to address our performance in this area. An improvement plan was
developed and implemented which has delivered a sustained increase in performance in 2023/24 and 2024/25. We aim to be 100% compliant and
efforts continue to close the remaining gap. However, completing the EICR programme in the context of continuing tenant refusal makes this extremely
challenging. Resorting to forcing access using our Access Policy is also extremely resource intensive for both the Council and our contractors. 
We have a dedicated Contracts, Compliance and Maintenance team within our Property Management and Investment service who ensure all statutory
compliance requirements are met with regards to lift maintenance and legionella. We also have a dedicated asbestos compliance officer who works
with all officers conducting any form of refurbishment or alteration to buildings to ensure compliance with legislation in all instances. 
Condensation, Dampness & Mould
North Ayrshire Council has a robust approach to dealing with cases where dampness and mould are reported. A strategy - which encompasses our
approach to both Council homes and the private sector - and an improved proactive “end to end” process is in place.
A comprehensive process map has been developed that sets out the process and ensures issues with damp and mould are effectively addressed.
This includes a prioritised work stream where health concerns are present and involves joint service working towards positive outcomes. An
anniversary inspection visit has been introduced to measure the effectiveness of earlier interventions and statistics are reviewed per property type
to feed into longer term asset management objectives. The core of this process is in place and further elements, such as an expansion in the use of
electronic monitoring, are also under consideration. To improve ventilation provision, a humidity tracking fan, instead of a standard extractor fan, is
now being installed as a minimum standard in all Projects, Void, and Repair works.
Our Building Services Inspection Officers, who inspect instances of dampness and mould, are all from a building trade background and are qualified
to HNC in Construction standard as a minimum. Further specialist training in dampness, mould, and timber decay has been undertaken by two
officers who have achieved the industry recognised qualification of Certificated Surveyor of Timber and Dampness in Buildings (CSTDB).
Tenant engagement has also been increased, with regular information provided via the digital Tenant Chat and social media channels.
Close attention is being paid to the implementation of Awaab’s Law in England (October 2025) and consideration is being given to the implications
of this being adopted by the Scottish Government.
Repairs, maintenance, and improvements 
North Ayrshire Council is committed to delivering a high quality, efficient and effective reactive and planned maintenance service to all our tenants and
factored owners in a manner which maintains high customer satisfaction. Our Repairs Policy sets out the service provided by the Council for repairs
and maintenance and aims to ensure the needs of our current and future tenants are met in relation to the provision of high-quality housing. The
22

Page 23

Appendix 2 
policy is currently under review as part of the Housing Transformation Board workstream and will be developed in consultation with tenant
representatives. 
The average length of time taken to complete emergency repairs increased slightly from 2.29 in 2023/24 to 2.72 hours in 2024/25 and decreased
from 6.76 to 6.60 days for non-emergency repairs. Despite the slight decrease in performance to respond to emergency repairs, we continue to remain
within our four-hour target for emergencies, as set out in our housing repairs policy. The increase in performance for non-emergency repairs is due
to the introduction of a new ‘handyman’ post which enables Building Services to complete a higher volume of routine multi-trade jobs more quickly
and creates capacity for qualified operatives to undertake more complex, trade specific works. 
Satisfaction levels of tenants who had repairs or maintenance carried out in the last 12 months decreased from 97.51% to 86.78% during 2024/25.
This is based on responses from 1,490 tenants received. 
An efficient and effective void repairs service provides a quick turnaround on empty properties, which helps to accelerate the repairs process and
reduce void rent loss. Void performance is affected by the additional time taken to rehouse tenants affected by our regeneration projects. A general
increase in the number of properties requiring major works such as central heating, rewiring and full decoration has also impacted on performance.
The average time taken to re-let properties has decreased from 31.93 days in 2023/24 to 27.89 days in 2024/25. Void performance continues to be
affected due to issues with utility meters, which is recognised nationally as a significant issue and has been escalated to the Scottish Government for
action. Housing Services are working with Building Services to review the current void process as part of the Housing Transformation Board
workstream, to ensure the delivery of an effective and efficient service for tenants and to assist in future proofing our housing stock. Despite the slight
increase in the number of days taken to re-let voids we are still ranked a top performer within our SHN benchmarking peer group for 2024/25 and
second across all local authorities. 
Standard 3 – Neighbourhood and community 
Outcome: 
Estate management, antisocial behaviour, neighbour nuisance, and tenancy disputes 
Estate Management covers a broad range of situations and activities such as new tenant visits, permissions for garages and driveways in garden
ground, abandoned tenancies, untidy gardens, neighbour disputes, problems with pets, abandoned vehicles, tackling graffiti and illegal dumping/fly-
tipping. We have a comprehensive Estate Management procedure manual to ensure we meet our responsibilities as a landlord, and to support tenants
to meet their responsibilities as detailed within their Tenancy Agreement. Every effort is made to support tenants to address any breach of the tenancy
agreement, however if a tenant is consistently unwilling to do adhere to the tenancy agreement, the Council will pursue appropriate and proportionate
action. 
23

Page 24

Appendix 2 
In May 2024, a new integrated service delivery model was implemented, with housing, homelessness, advice, support and anti-social behaviour
officers located within locality-based housing offices.  Teams are working to identify the service priorities within each town to ensure there is a joined-
up response to delivering an improved service to our tenants and residents by resolving any issues as they arise at local level. 
During 2023/24 the remit of the Estate Caretaker post was reviewed and redesignated as an Estate Officer, with the focus on providing a more
proactive, rather than reactive, service for our tenants and residents. 
The Safer North Ayrshire Partnership (SNAP) is a multi-agency group who work together with local communities and key stakeholders to prevent
crime and antisocial behaviour, responding quickly and proportionately to arising issues. 
We experienced a 13.4% decrease in reports of ASB during 2024/25 compared to the previous year. The Council has locally agreed targets for the
closure of ASB cases, which are based on the complexity and level of investigation required to resolve them.  Our performance against the locally
agreed targets during 2024/25 was 96.3% of cases resolved within agreed timescales, against a target of 94%. 
Our last tenant satisfaction survey was carried out during 2024/25, with 91.3% of tenants responding that they were satisfied with the management
of the neighbourhood they live in. This reflects is a significant improvement to the previous survey, which showed an 80% satisfaction level. 
Standard 4 – Access to housing and support 
Outcomes: 
Housing options and access to social housing
We are currently reviewing our Housing Allocation Policy alongside our RSL partners, with implementation expected in November 2025.  This review
is examining key themes that have emerged from our last review in 2019 and any upcoming legislation that could impact housing allocations.  We
introduced an Arran Local Letting Initiative in April 2021, which allows island residents and key/ essential workers to be given additional priority for
housing on the Island. Trust Housing Association joined the North Ayrshire Housing Register (NAHR) in April 2025 and have adopted the Arran Local
Letting Initiative. 
In relation to our void processes, timescales are mutually agreed by the Housing Officer and Building Services supervisor, based on the amount of
work required. The average time taken to re-let properties reduced from 31.93 days in 2023/24 to 27.89 days in 2024/25. Our 2024/25 void
performance was affected by issues with utility meters, which is recognised nationally as a significant issue and has been escalated to the Scottish
Government for action. We have established a cross-service working group to review and analyse our void processes. The group will scrutinise current
working practices to identify opportunities to improve our void processes, turnover performance and to create efficiencies. 
24

Page 25

Appendix 2 
Senior officers from Housing and Building Services (who carry out the majority of works in Council dwellings) have periodic meetings with officers
from North Ayrshire Health and Social Care Partnership (NAHSCP) who – in accordance with the Integration Scheme - manage the process for aids
and adaptations. This allows us to understand demand and agree, set, and monitor performance in relation to expenditure. NAHSCP have a formal
Adaptations Criteria and Policy for staff to adhere to; this ensures a consistent and high-quality adaptations assessment process. Joint complex case
reviews are held monthly between NAHSCP and Housing professionals to agree the scope of the works to be undertaken. OT staff have been trained
to explore the housing options of housing applicants with long term health conditions, to ensure that accessible housing needs are met where
adaptations are not appropriate. These tiers of governance provide a formal procedure for all decision making, ensuring resources are targeted to
those most in need of adaptations.   
There has been a decrease in the number of households waiting for an adaptation to their home, decreasing from 302 in 2023/24 to 232 in 2024/25. 
The average number of days to complete an approved adaptation has also significantly decreased from 90.08 to 57.25 days.  The joint improvement
group comprising of Housing Services, Building Services, Property Management and Investment and the Health and Social Care Partnership continue
to review demand and current work processes, in order to deliver the best service outcome and value for money for tenants. 
Homeless people 
Approaches for homelessness assistance 
Approaches for homelessness assistance in North Ayrshire increased by 8.29% during 2024/25 compared to the previous year, resulting in rising
pressure on the demand for temporary accommodation.  The national performance statistics published annually by the Scottish Government have
highlighted that homelessness is at its highest level since 2011/12, with the number of open homelessness applications and households in temporary
accommodation reaching the highest in the time series (back to 2003 and 2002 respectively). 
Whilst there is increasing pressure on the housing system locally in North Ayrshire, a range of measures are in hand to respond to this, including
increasing housing supply, ensuring our void properties are turned around as quickly as possible for re-let, and managing the demand from homeless
people by using our supply of temporary and permanent accommodation. We have changed the service delivery model within Housing
Operations/Homelessness services to enable prevention activities to be undertaken at a locality level, with newly integrated teams working to identify
the service priorities within each locality. The Homelessness Task Force that we have in place comprises of a range of stakeholders who are working
to analyse the variety of datasets we have at our disposal.  The purpose of this is to understand the changing dynamics of the homelessness system
and risk factors.  The work of the task force includes preparation of a new Homelessness Prevention Strategy, which will consider all of the levers at
our disposal to balance the system and will also be aligned to the new Housing (Scotland) Bill 2024. In addition, a key component of our current
allocations policy review is to understand the impact of increased lets to homeless households and the options available for mitigation.  
Reasons for approach for homeless assistance
25

Page 26

Appendix 2 
The main reason for homelessness in North Ayrshire during 2024/25 was as a result of a relationship breakdown, accounting for 266 approaches
(22.47%); this is followed by people being asked to leave the family home, which accounted for 217 (18.33%) approaches. 
Applications from households fleeing domestic abuse accounts for 171 homeless approaches (14.4%) during 2023/24, compared to 170 approaches
(15%) in 2023/24. 
We have had no breaches of the Unsuitable Accommodation Order and have ensured that temporary accommodation continues to be available for
anyone who needs it.  We have continued the delivery of the Rapid Rehousing Transition Plan (RRTP) and met the year five target to deliver 100
Housing First tenancies for the most vulnerable homeless households in North Ayrshire by 31 March 2024; as at 31 March 2025 we had created 123
tenancies. 
The North Ayrshire Homelessness Task Force has reviewed the above performance to inform our Homelessness Prevention Strategy moving forward. 
Standard 5 – Getting good value from rents and service charges  
Outcomes: 
Value for money
Our robust Housing Revenue Account 30-year Business Plan provides clear strategic direction, ensuring that effective short, medium, and long-term
financial planning is undertaken.  This clearly details how we will plan for, and deliver, key priorities such as compliance with the Scottish Housing
Quality Standard, investment in our current stock, our Council house building programme and rent setting. 
The Business Plan was developed by a cross stakeholder working group which included representation from elected members, tenant representatives
and officers from within Housing, Property Management and Investment, Building Services and Finance.  This approach ensured balanced decision-
making that can stand up to both internal and external scrutiny. 
In addition to the business plan, we have an effective budget and performance management reporting framework that makes certain that we continue
to provide value for money services to our tenants and, at the same time, keep rents at affordable levels.  This is achieved while recognising that we
are currently operating within an extremely challenging and evolving economic environment which requires sufficient flexibility to be able to change
and adapt investment plans. 
The Business Plan is easily accessible to stakeholders.  It provides information to demonstrate that the Council has a clear picture of its strategic
direction and the associated financial position of the service to deliver this, over the 30-year planning period.  This plan is reviewed annually, and we
are focused on providing value for money through a number of measures, such as operating robust financial management processes, implementing
value for money principles, exploring efficiency opportunities, and managing competitive contractual arrangements.  
26

Page 27

Appendix 2 
The HRA Capital Investment Programme, Revenue Budget and Rent Levels report for 2023/24 highlighted that the HRA was facing affordability
challenges, primarily due to higher rates of inflation and increased borrowing rates. In order to minimise the risk of these challenges and keep rent
increases sustainable, savings and efficiencies were identified, and a Housing Transformation Programme was created. However, during rent setting
for 2025/26 it was identified that further work is required to establish efficiencies as it highlighted that there remains a significant risk to the HRA
Business Plan and its long-term sustainability, therefore four key projects have therefore been prioritised within Housing’s wider Transformation
Programme: 
• Income maximisation
• Repairs & maintenance
• Void works
• Aids & adaptations 
During our last tenant satisfaction survey 89.87% of tenants confirmed they felt that the rent for their property represents good value for money. 
Rents and service charges
Our rent levels remain in line with the national average, whilst continuing to invest in our existing stock and new house building programme. Our
plans takes account of the strategic context, such as: the prevailing economic situation and expectations/ forecasts for the time horizon of the
business plan; the broader context for tenants and other service users such as rent affordability, cost of living, welfare policy and how the labour
market is performing; and the broader context for landlords such as cost pressures in repairs, maintenance and development, supply chain issues,
investment decisions in meeting net zero obligations and tackling homelessness.  We manage these pressures and are committed to delivering
services in new, improved and more cost-effective ways. 
Standard 6 – Other customers  
Outcomes: 
Gypsy/travellers
North Ayrshire Council recognises Gypsy/Travellers to be a minority ethnic community, as set out by Scottish Government guidelines. As a council
we:
• recognise Gypsy/Travellers' right to a nomadic life;
• respect that they may wish to maintain a travelling way of life as part of their cultural identity. 
There should be no discrimination against Gypsy/Travellers because of their way of life or culture.
27

Page 28

Appendix 2 
We provide services, advice and assistance to Gypsy/Travellers living permanently in North Ayrshire and additionally to those who visit on a temporary
basis. North Ayrshire Council manages one permanent site at Redburn Grove in Irvine. The site has 16 pitches, and each pitch has its own amenity
block with separate kitchen, shower, toilet facilities and utility room. The site is monitored and supported through our Gypsy/Traveller Coordinator. A
community room is available on site for partner services to meet tenants and their children within a safe and comfortable environment. The room is
used by several services, including Education, the Welfare Reform Advice team, Tenancy Support, the Community Link team, and a regular GP
surgery. Our Tenant Participation Team also support Redburn Grove tenants to hold regular tenants’ meetings. The meetings allow tenants the
opportunity to work in partnership with Council staff as we consider options for current and future service provision. 
In 2016 the Scottish Government introduced minimum standards for Gypsy Traveller Sites across Scotland. North Ayrshire Council achieved the
minimum standards at Redburn Grove; however, we recognise that significant capital investment is required to ensure that it continues to meet
expected standards. Following consultation with current tenants in April 2023, future improvement proposals for the Redburn site have been
developed, reflecting on feedback gathered in relation to their preferences for future housing. The proposed development will form part of our Strategic
Housing Investment Plan (SHIP) submission for 2026-2031. 
The Scottish Government has developed a draft design guide for Gypsy/Traveller sites to be used for new sites or major refurbishments of existing
sites. The design guide has been provided to give advice on what good quality; culturally appropriate accommodation should look like. The Scottish
Government previously had a capital fund available for five years from 2021-25, with criteria clearly outlined for the fund, including how residents and
travelling community members would be involved, together with a process for project selection. However, this was put on hold due to funding
constraints. During August 2024, the Scottish Government wrote to all local authorities to advise them that the fund will be reintroduced from 2026-
27 onwards. The Scottish Government will work with COSLA and relevant colleagues to ascertain how the fund will be utilised using the information
gathered from the demonstration projects completed through the previous fund. 
Our response to supporting and managing unauthorised encampments fully complies with Scottish Government policy. Our Gypsy/Traveller
Coordinator works to build relationships with visiting families to assess their needs. Where necessary they make referrals to partner organisations
and provide advice on housing options, if required. The Officer also works closely with private landowners and members of the wider community and
provides advice and assistance regarding the rights and responsibilities of Gypsy/Travellers who visit North Ayrshire. We are represented on COSLA’s
Gypsy/Traveller Lead Officers Group and their Negotiated Stopping Pilot Working Group. 
Our latest satisfaction survey carried out during 2024/25 highlighted that 27.3% of the 16 tenants in Redburn Grove are satisfied with the landlord’s
management of the site. We instructed a separate in-depth independent Gypsy/Traveller site survey to be conducted alongside our wider tenant
satisfaction survey; this has indicated a low level of satisfaction and has provided a greater understanding of the issues. Dissatisfaction with the
management of the site is largely in relation to the condition of the site, which has been impacted by availability of funding. Findings from the
independent report will inform and influence our investment proposals for the site. 
Refugees
28

Page 29

Appendix 2 
North Ayrshire Council is fully committed to supporting the UK Humanitarian programmes in place to accommodate and support refugees. This work
is coordinated by our inter-agency Refugee Task Force comprising of senior officers from across the Community Planning Partnership (CPP) including
Housing, the Health and Social Care Partnership, Education, Department of Work and Pensions, Police Scotland, and voluntary organisations. 
Our Refugee Support Team work together with the CPP partners to deliver robust resettlement support to assist families to integrate into the local
communities and access vital services to meet their individual needs. 
During 2024/25, the Council and community planning partners have supported 145 Ukrainian households, comprising of 347 individuals, to resettle
in North Ayrshire across the different Scottish Government sponsorship schemes. To support the schemes, 33 properties were bought during 2023/24
using our buy-back approach, and allocated to Ukrainian households. 
In total we have provided 120 units of social housing stock to provide long term accommodation for households. We previously supported a Welcome
Hub which was set up within a local hotel to provide interim emergency accommodation and support to a number of individuals and families while
they awaited a more appropriate housing solution. The transition of all guests to permanent housing was successfully completed by September 2023. 
In the last 12 months, in partnership with the Scottish Government, we have redeveloped a large vacant property to provide temporary accommodation
for a further three Ukrainian families. We have also purchased 33 ex-local authority properties throughout North Ayrshire to support the Ukrainian
resettlement programme. The 33 properties were fully funded by the Scottish Government with the condition that they are utilised for Ukrainian
Displaced Persons (UKDPs) for the first three years. Thereafter, they can be utilised for mainstream housing allocations. 
Housing Services are monitoring resettlement provision carefully to ensure we continue to meet our statutory responsibilities in relation to other priority
groups including homeless people. 
29

Page 30

Appendix 3
Data corrections - North Ayrshire Council - 2023/24
Original Return Updated Return
C2 The number of lets during the reporting year by source of let
C2.1 The number of lets to existing tenants 139 160 148
C2.2 The number of lets to housing list applicants 328 310 435
C2.3 The number of mutual exchanges 127 117 110
C2.4 The number of lets from other sources 0 0 110
C2.5 The number of lets to homeless applicants 522 525 457
C2.6 Total number of lets excluding exchanges 989 995 1,040
C3
C3.1 The number of ‘general needs’ lets during the reporting year 755 758 780
C3.2 The number of ‘supported housing’ lets during the reporting year 234 237 260
Total 989 995 1,040
15
15.1 The number of cases of anti-social behaviour reported in the last year 961 1030 892
15.2 The number of cases resolved in the last year 882 891 764
Percentage of anti-social behaviour cases reported in the last year
which were resolved. 91.78% 86.5% 85.65%
C6
C6.1 The number of households the landlord received housing costs
directly for during the reporting year 9,303 9,308 9,467
C6.2 The value of direct housing cost payments received during the
reporting year £33,549,048.00 £34,066,609.00 £35,461,809
C7
C7.1 The total value of former tenant arrears at year end £1,408,785.00 £1,393,572.14 £1,905,950
C7.2 The total value of former tenant arrears written off at year end £214,705.00 £282,732.26 £708,780
% of former tenant rent arrears written off at the year end 15.24% 20.29% 37.19%
18
18.1 The total amount of rent due for the reporting year £55,954,535.00 £57,883,644.58 £60,150,591
18.2 The total amount of rent lost through properties being empty during
the reporting year £226,193.00 £415,263.29 £335,788
% of rent due lost through properties being empty during the last yea 0.40% 0.72% 0.56%
Indicator Title 2023/24 Annual Return 2024/25 Annual
Return Explanation
Partially validated by CDC. Issues with
interface between Civica and Northgate
identifying some transfer tenants as
housing list applicants.
Partially validated by CDC. Inappropriate
categorisation of some void periods as
protracted voids impacting rent due and
void rent loss.
Guidance on exclusions updated and
circulated. New process in place for
recording excluded periods and quality
assurance checks undertaken monthly.
Performance has improved for 2024/25.
Corrective Action
Interface updated to ensure data is being
transferred from Civica to Northgate as
required.
No corrective action required.
Data collation process now updated to
reduce/eliminate risk of administrative
error.
Data collation process now updated to
reduce/eliminate risk of administrative
error.
Number of households for which landlords are paid housing costs directly and the total value of the payments received in the reporting year
Percentage of anti-social behaviour cases reported in the last year which  were resolved
Number of lets during the reporting year, split between 'general needs' and 'supported housing'
Annual Return on the Charter (ARC)
Amount and percentage of former tenant rent arrears written off at the year end
Percentage of rent due lost through homes being empty during the last  year
Partially validated by CDC. Administrative
error.
Not  validated by CDC. Inappropriate
categorisation of some void periods as
protracted voids impacting rent due and
void rent loss.
Originally validated by CDC.
Consequence of change to C2.
Internal audit finding. Administrative error -
69 cases excluded due to a filter being
applied to data.
Guidance on exclusions updated and
circulated. New process in place for
recording excluded periods and quality
assurance checks undertaken monthly.
30

Page 31

Original Return Updated ReturnIndicator Title 2023/24 Annual Return 2024/25 Annual
Return Explanation Corrective Action
26
26.1 The total amount of rent collected in the reporting year £55,823,549.00 £55,117,307.69 £61,073,526
26.2 The total amount of rent due to be collected in the reporting year
(annual rent debit) £55,954,534.00 £57,464,478.29 £60,479,757
Rent collected as percentage of total rent due in the reporting year 99.77% 95.92% 100.98%
27
27.1 The total value (£) of gross rent arrears as at the end of the reporting
year £3,288,727 £4,327,533 £4,831,586
27.2 The total rent due for the reporting year £55,954,535 £57,883,645 £60,150,591
Gross rent arrears (all tenants) as at 31 March each year as a
percentage  of rent due for the reporting year 5.88% 7.48% 8.03%
30
30.1 The total number of properties re-let in the reporting year 919 934 979
30.2 The total number of calendar days properties were empty                             24,686 29,827                            27,305
Average time to re-let properties in the last year 26.86 31.93 27.89
16
16.1.1 Number of tenancies in previous year: Existing Tenants 113 134 139
16.2.1 Number of tenants remaining in their tenancy: Existing Tenants 112 123 133
% of tenancies sustained: Existing Tenants 99.12% 91.79% 95.68%
16.1.2 Number of tenancies in previous year: Homeless 482 487 522
16.2.2 Number of tenants remaining in their tenancy: Homeless 405 409 452
% of tenancies sustained: Homeless 84.02% 83.98% 86.59%
16.1.3 Number of tenancies in previous year: Housing List 473 569 328
16.2.3 Number of tenants remaining in their tenancy: Housing List 440 504 307
% of tenancies sustained:  Housing List 93.02% 88.58% 93.60%
16.1.4 Number of tenancies in previous year: Other 0 0 0
16.2.4 Number of tenants remaining in their tenancy: Other 0 0 0
% of tenancies sustained: Other 0 0 0
Partially validated by CDC. Inappropriate
exclusion of void period following the death
of a tenant and categorisation of properties
subject to major works.
Originally on-line for validation by CDC,
however figures subsequently changed.
Inappropriate categorisation of some void
periods as protracted voids impacting rent
due and void rent loss.
Guidance on exclusions updated and
circulated. New process in place for
recording excluded periods and quality
assurance checks undertaken monthly.
Performance has improved for 2024/25.
Guidance on exclusions updated and
circulated. New process in place for
recording excluded periods and quality
assurance checks undertaken monthly.
This is a key focus of the Housing
Transformation programme and an Income
Collection Strategy is currently being
developed.
Guidance on exclusions updated and
circulated. New process in place for
recording excluded periods and quality
assurance checks undertaken monthly.
Performance has improved for 2024/25.
Unable to validate by CDC. Issues with
interface between Civica and Northgate
transferring information on the source of
let.
Not validated by CDC. Inappropriate
categorisation of some void periods as
protracted voids impacting rent due and
void rent loss.
Interface updated to ensure data is being
transferred from Civica to Northgate as
required. Performance has improved for
2024/25.
Rent collected as percentage of total rent due in the reporting year
Gross rent arrears (all tenants) as at 31 March each year as a percentage  of rent due for the reporting year
Average length of time taken to re-let homes in the last year
Percentage of new tenancies sustained for more than a year, by source of  let
31

Page 32

Original Return Updated ReturnIndicator Title 2023/24 Annual Return 2024/25 Annual
Return Explanation Corrective Action
8
8.1 The total number of emergency repairs completed in the reporting year 12,765 19,043                            20,675
8.2 The total number of hours taken to complete emergency repairs 27,079 43,626                            56,246
Average length of time taken to complete emergency repairs 2.12 2.29 2.72
9
9.1  The total number of non-emergency repairs completed in the
reporting year 12,738 15,305 16,330
9.2 The total number of working days taken to complete non-emergency
repairs 96,801 103,491 107,745
Average length of time taken to complete non-emergency repairs 7.6 6.76 6.6
10
10.1 The number of reactive repairs completed right first time during the
reporting year 10,961 13,803 14,733
10.2 The total number of reactive repairs completed during the reporting
year 11,202 13,362 15,379
Percentage of reactive repairs carried out in the last year completed
right first time 97.85% 96.81% 95.80%
21
21.1 The total number of days taken to complete all adaptations 77,905                            74,317                            55,362
21.2 The total number of adaptations made during the reporting year 860 825 967
The average time to complete adaptations (days) 90.59 90.08 57.25
11
11.1 The number of times you did not meet your statutory duty to complete
a gas safety check 27                                      25                                      1 Unable to validate by CDC. Administrative
error.
Data collation process now updated to
reduce/eliminate risk of administrative
error. Performance has improved for
2024/25.
Internal audit finding. Administrative error
due to inclusion of public holidays and
some non-relevant works.
Percentage of reactive repairs carried out in the last year completed right  first time
The average time to complete adaptations
Average length of time taken to complete non-emergency repairs
Partially validated by CDC. Repairs
completed by gas maintenance contractor
omitted from original return, and incorrect
treatment of non-HRA and communal
repairs.
Partially validated by CDC. Repairs
completed by gas maintenance contractor
omitted from original return, and incorrect
treatment of non-HRA and communal
repairs.
Partially validated by CDC. Repairs
completed by gas maintenance contractor
omitted from original return, and incorrect
treatment of non-HRA and communal
repairs.
How many times in the reporting year did not meet your statutory duty to complete a gas safety check
Average length of time taken to complete emergency repairs
Data collation process now updated to
ensure relevant data is included.
Data collation process now updated to
ensure relevant data is included.
Performance has improved for 2024/25.
Data collation process now updated to
ensure relevant data is included.
Data collation process now updated to
reduce/eliminate risk of administrative
error. Performance has improved for
2024/25.
32

Page 33

NORTH AYRSHIRE COUNCIL 
23rd September 2025   
Audit and Scrutiny Committee 
Title:    Our Council Plan Year End Progress Reporting including
LGBF Analysis 
Purpose:  To consider and approve Our Council Plan Year End
Reporting including LGBF Analysis 
Recommendation:  The Audit and Scrutiny Committee agrees to: 
(i) Consider progress within the LGBF Report as at June
2025 (Appendix 1). 
(ii) Consider Our Council Plan Six Monthly Progress Report
1 October to 31 March 2025 (Appendix 2).
(iii) Consider Our Council Plan Annual Performance Report
(Appendix 3).
(iv) Note Cabinet approval relates to the content of the
report, not the layout or media used to ensure future
flexibility for production of accessible format reports. 
1 Executive Summary 
1.1 Our Council Plan 2023-28 is the overarching strategy of our council and details
our council’s strategic priorities.  We have a statutory duty to publish information
that enables effective scrutiny of our performance.
1.2 This report presents the progress made in delivering Our Council Plan 2023-
2028 as at Year-End 2024-2025. As a result, this report combines three key
Council Plan and corporate performance reports: 
• The Local Government Benchmarking Framework (LGBF) - Analysis of June
2025 Data Release. (Appendix 1)
• Our six-monthly Council Plan 2023-28 Progress Update, Year End 2024/25
(Appendix 2)
• Our Annual Performance Report 2024/25 (Appendix 3) 
1.3 As a continuation of the approach at Mid-Year and following Best Value Thematic
Audit recommendations, the report includes further details on:
Agenda Item 3
33

Page 34

• Transformation workstreams.
• Workforce Planning. 
1.4 To adhere to the Statutory Performance Information Direction 2024 Cabinet
agreed to note that approval of the report is considered as approval of the content
of the PDF report.  The report formatting may be changed following Cabinet
approval to enable publication in more accessible formats such as html on our
website and other media.  In addition, summaries may be produced for easy read
and child friendly versions as appropriate.
1.5 Following Cabinet approval, our corporate performance reports are published on
our website www.north-ayrshire.gov.uk/performance.
2 Background 
2.1 Under the Local Government (Scotland) Act 1992 and Local Government in
Scotland Act 2003 we have a duty to demonstrate Best Value.  To ensure we
support our residents, fulfil our statutory duties and invite scrutiny, we actively
manage performance and develop our reporting to make it accessible and
engaging.
2.2 How we demonstrate our performance is defined in the Statutory Performance
Information (SPI) Direction 2021 for up to year ending 31 March 2025.  The
Statutory Performance Information Direction 2024 takes effect on reporting of
activity that takes place from 1st April 2025 for reporting year 2025-26 for
approximately three years.  Though outside the scope of Direction 2024,
elements from it have been considered within this report.
2.3 One key area for consideration is the need to ensure our reports are both
“technically accessible” and “non-technically accessible”.  The Direction
Guidance refers to “technically accessible” as adhering to accessibility
regulations including the use of language, layout of the report, contrast and use
of image alternative text.  “Non-technically accessible” refers to ensuring our
performance is easily understood and engaging, such as the magazine style
used for our six-monthly reports.  To adapt our reporting effectively to adhere to
our statutory obligations and explore the use of html, easy read and child friendly
versions while ensuring effective governance, Cabinet agreed to note that
approval of the report is considered as being for the content of the PDF reports
and that specific wording, layout, format or media used may be adapted to make
it suitable for other audiences, such as our young people under the UNCRC
(Incorporation) (Scotland) Act 2024, while keeping our performance fully
transparent.
2.4 We have embedded key contextual indicators from the Wellbeing Economy
Dashboard - which outlines our council’s Wellbeing Economy journey. We will
continue to work with the Economic Policy Team to further embed this approach
as the new Wellbeing Economy Dashboard becomes established.  
34

Page 35

3 Assessment of Performance 
Performance Indicators
3.1 There are 26 performance indicators within our framework. As at Year End, 18
(75%) of our indicators where the status is known are either on target or just
slightly adrift of target and 6 (25%) are significantly adrift of target.  A comparison
to our position at the same period last year is shown below when 88.9% of
indicators were on or slightly adrift of target.
Status Year End 2023/24 Year End 2024/25
On Target (Green) 14 (77.8%*) 13 (54.2%*)
Slightly Adrift of Target
(Amber) 2 (11.1%*) 5 (20.8%*)
Significantly Adrift of
Target (Red) 2 (11.1%*) 6 (25%*)
Data Only / Status
Unknown 8 2
(* Of PIs where status is known)
3.2 The status of a PI is determined by the following tolerances:
Status Description 
On target 
Slightly adrift of target (typically this represents a variance ≥ 1% and < 5% from the
target). 
Significantly adrift of target (typically this represents a variance ≥ 5% from the target). 
Data only (PIs only) – this is where a target has intentionally not been set, usually due
to the indicator being a new indicator or where we can only partly contribute to the
outcome. 
Data not available / status unknown - (PIs only) the status is not available either due to
data not being available or no target being set.
(Source:  Our Performance Management Strategy 2023/2028)
3.3 Of the eight PIs where the status was either data only (target intentionally not
set) or status unknown at year end in 2023/24, their status was finalised in this
reporting period as three red, one amber and four green.  The three red and one
amber relate to CP37 (average total tariff score of pupils living in SIMD 20% most
deprived areas), CP_06 (average tariff score, all leavers), CP_38 (average total
tariff for care experienced young people) and CP_04 (proportion of children
meeting developmental milestones) respectively.    
35

Page 36

3.4 For these PIs, the status was set to data only (i.e. target intentionally not set) for
2022/23, and stretch targets were set for several for 2023/24 (see paragraph
3.35 below).  The most recent data relates to 2023/24 academic years and has
been released recently.  As a result, these statuses are reported for the first time
within this year end 2024/25 progress report.
3.5 Though this position makes it difficult to determine conclusively whether our
overall performance status based on PIs has improved during the year, the
individual PI progress is detailed below and despite being adrift of target, shows
consistent progress in many areas.
3.6 Context for the PIs adrift of target and not previously reported in our performance
reporting are detailed in Appendix 2 and listed below:
3.7 CP_37 Average total tariff score of pupils living in SIMD 20% most deprived
areas (Red)
3.8 Actual is 664.3 against a target of 714 for 2023/24 (most recent data available). 
The average total tariff score gained from all qualifications by 2024 school
leavers from the 20% most deprived SIMD data zones has marginally decreased
from the previous year.  The endeavour to offer candidates a wider breadth of
learning experiences has included more courses (or units of courses) from a
wider vocational range of courses and awards that sometimes are graded at the
same SCQF level as National Qualifications courses but amass a smaller
number of tariff points in the Insight scale. However, these courses can provide
learners with a more suitable set of skills and knowledge to prepare them for
work, training or further education. 
3.9 Though this PI records the total tariff score for SIMD Quintile 1 of S4-6 pupils
who left school in 2023/24, the LGBF has a similar measure based on the cohort
of young people who would have reached the end of S6 in 2023/24, irrespective
of their leaving year.  For the same period, 2023/24, the equivalent LGBF
measure shows a total tariff score of 685, above both the family group average
of 660 and the Scottish average of 658 and leading to our council being ranked
6th in Scotland. 
3.10 CP_06 Average tariff score: All Leavers (Red)
3.11 Actual is 840.8 against a target of 908 for 2023/24 (most recent data available). 
The average total tariff score gained from all qualifications by school leavers has
marginally decreased from the previous year but is in line with pre-pandemic as
well as recent years’ performance. The 2019/2020 and 2020/2021 results are not
comparable with other academic years, as SQA has employed the Alternative
Certification Model (ACM) instead of exam-based evaluation for awarding
qualifications at SCQF level 5 and above. Advice provided by Scottish
Government colleagues emphasises direct comparison to alternative certification
years should not be made without further evidence and the impact of these
approaches. For all SIMD deciles except SIMD 10 (for which we have a very low
number of learners), we continue to outperform national figures. 
3.12 Though this PI records the total tariff score of S4-6 pupils who left school in
2023/24, the LGBF has a similar measure based on the cohort of young people
who would have reached the end of S6 in 2023/24, irrespective of their leaving
36

Page 37

year.  For the same period, 2023/24, this measure shows a total tariff score of
845, above the family group average of 829 but below the Scottish average of
917 and ranked 26th in Scotland. 
3.13 Closer examination of the LGBF highlights the strong influence that deprivation
has on this indicator. When disaggregated by SIMD quintile, our council
outperforms both the national figures and the family group for each of SIMD
quintiles 1 to 4 and also outperforms the family group for SIMD quintile 5. Despite
this strong performance, we know it is important to maintain our holistic, cross-
service commitment to our Wellbeing priority in order to reflect this at an absolute
level. 
3.14 CP_38 Average total tariff for care experienced Young People (Red)
3.15 Actual is 355 against a target of 465.  The average total tariff score (ATTS)
achieved by North Ayrshire care experienced leavers was lower in 2023/2024,
at 355 tariff points, than the general trend over the last five years. A slightly higher
proportion than average of care experienced learners left before the end of S6 in
2023/2024, which has contributed in part to the lower average total tariff score. 
3.16 Schools have analysed the data locally and have a clear narrative for individual
circumstances. The service will continue to focus on improving this benchmark
of achievement for care experienced learners.  Attainment of care experienced
learners is specifically referenced within the Education Service Plan. Quality
Improvement visits and attainment discussions with senior school leaders will
include a focus on the attainment and achievement of this group of learners to
ensure consistency of delivery of interventions with a positive impact.
3.17 CP_40 Number of new build housing units reaching completion (all
tenures) (actual not cumulative) (Red)
3.18 Actual 371 against a target of 396.  We achieved our target for 2024/2025 with
regards to new build social housing and have limited influence over the delivery
of new build housing constructed by private housing developers to meet the total
396 homes target. The 25 new homes unable to be delivered during 2024/2025
were across a number of sites throughout North Ayrshire. We exceeded our
target for bringing empty homes back into use and intend to review this
performance indicator and continue to focus on improving performance in the
forthcoming year. (This indicator is linked to action CP_10 detailed below).
3.19 CP_30 Total installed capacity of low carbon heat and electricity generation
across the council's estate (Red)
3.20 Actual is 17,630 against a target of 28,499.  Our council had aimed to have both
solar PV farms energised in December 2024, however this has not been possible
due to extended development time required by the Distribution Network
Operator.  The solar farms have been built and are due to be commissioned in
the summer.  
3.21 CP_31 % of total household waste that is recycled (calendar year as per
SEPA) (LGBF) (Red)
3.22 Actual is 52.8% against a target of 56%.  The provisional household waste
recycling figure for the calendar year 2024 is 52.8%, subject to verification by
SEPA. This has reduced since 2023 as a result of the introduction of the new
37

Page 38

SEPA guidance regarding the requirement for Waste Upholstered Domestic
Seating (WUDS) to only be sent for incineration, which has negatively affected
the amount of bulky waste that can be recycled (this affects all councils).  In
addition, more wood is being deposited at recycling centres suitable only for
biomass recovery rather than recycling. 
3.23 For context, LGBF benchmarking information for 2023/24 (2023 calendar year)
released in June showed we were ranked third in Scotland.  Though our
provisional data shows a reduction for 2024/25, as the new SEPA guidance
affects all councils we will closely monitor our relative position when comparative
data is released over the coming months.
3.24 CP_04 Proportion of children meeting developmental milestones (LGBF)
(Amber)
3.25 Actual is 77.5% against a target of 79% for 2023/24 (most recent data available). 
At the most recent data release for data for 2023/2024, the proportion of children
meeting developmental milestones is 77.50%, slightly below the target of 79%. 
We are working to ensure there is more robust data gathering and analysis within
Early Years and are moving towards using CfE levels with inbuilt milestones. 
This will help improve accuracy and consistency of data as well as improved
progression pathways to primary.  Roles and remits for Excellence and Equality
Leads (EELs) developed this academic session will support this work.
3.26 The challenges we are experiencing in North Ayrshire are reflected in the LGBF
comparisons with other local authorities.  We are below the family group average
of 79.8% and the Scottish Average of 83.3%. As a result we are currently ranked
31 out of the 32 local authorities for our children meeting developmental
milestones. This is an area that we know will need specific focus within wider
principles of prevention and early intervention, including through the
Collaboration for Health Equity in Scotland. 
3.27 CP_28 Hectares of vacant and derelict land in North Ayrshire (Amber)
3.28 Actual is 942ha against a target of 925ha.  The majority of vacant and derelict
land sites are within private ownership, therefore their condition or development
timescales to inform if they are added or removed from the register is out with
the control of our council. However, we utilise the Repurposing Property Grant
Fund to help support landowners and community groups to bring back vacant
land and properties to use. Furthermore, in 2024/2025, several of the key
external regeneration funds which support the redevelopment of such land,
including the national Vacant and Derelict Land Investment Programme, were
paused which reduced the potential to regenerate sites.  Funding has now been
confirmed and works will commence in 2025/2026.
3.29 CP_43 Number of council assets under community management
(cumulative) (Amber)
3.30 Actual is 55 against a target of 56.  One Community Asset Transfer was delayed
until Q1 2025 due to some minor administrative issues within the community
group which took longer to resolve than expected. We continue to publicise the
range of offers available for management and ownership of assets to our
community groups and are currently engaged with around 30 groups at various
stages of the CAT process.
38

Page 39

3.31 CP_29 Overall carbon emissions (tonnes) (Non-domestic council estate)
(Amber) 
3.32 Actual is 20,333tCO2e against a target of 19,953tCO2e.  This figure is an
estimate and will be confirmed at the next data release.  Though slightly adrift of
target the overall trend is a steady decrease in emissions.  
3.33 CP_25 % of Council dwellings that meet the Scottish Housing Quality
Standard (LGBF) (Amber)
3.34 Actual is 94% against a target of 97.4%.  The target of 97.4% was set as part of
last year’s ARC completion. This pass rate is based on a combination of many
different compliance criteria for each individual property, including EICR
(Electrical Installation Condition Report). When the 97.4% compliance target was
set, it was based on 100% compliance regarding the EICR element; however
with issues accessing properties, we were unable to achieve this (the EICR
compliance outturn figure for 2024/25 was 97.71)%) which has resulted in the
slightly lower overall SHQS compliance of 94% against the 97.4% target.
3.35 Education Performance Targets
3.36 As mentioned above several of the education targets are linked directly to the
stretch aims previously agreed with the Scottish Government and show figures
that are significantly above the attainment levels achieved during the Covid
period when the Alternative Certification Model was deployed. 
3.37 It is not recommended to draw comparison between these periods. Therefor
while we recognise the merits of being aspirational and are committed to
delivering ongoing improvement over time, we believe it would be sensible to
reconsider the level of these targets to align them more closely to performance
in the post-Covid period. This is something we intend to do through appropriate
engagement and as part of the process of developing the next three-year service
plan due in 2026.  Cabinet approval will be sought through the new Education
Service Plan in 2026 or Council Plan Progress Reporting as appropriate.
Actions
One action is currently adrift of target:
3.38 CP10 Increase the number of homes in the area through a mix of private
and social developments and bringing empty buildings back into use
(Wellbeing Priority). (Amber)
3.39 This action is linked to the indicator “CP_40 Number of new build housing units
reaching completion (all tenures) (actual not cumulative)” which is currently
significantly adrift of target (red) (see above).  We achieved our target for
2024/2025 for new build social housing and we have limited influence over the
delivery of new build housing constructed by private housing developers. The 25
new homes unable to be delivered during 2024/2025 were across a number of
sites throughout North Ayrshire. We exceeded our target for bringing empty
homes back into use and intend to focus on improving performance in the
forthcoming year.  
39

Page 40

Local Government Benchmarking Framework
3.40 LGBF performance is viewed in short, medium or long-term trends in terms of
our actual performance as well as our position relative to other councils.  In
addition, the range of indicators contains those directly reflecting council
performance, those where performance is weighted by our demographics (per
10,000 population for example) or contextual (Gross Value Added and area wide
CO2 emissions) to reflect our operating environment.  This complex landscape
means it is difficult to summarise effectively across all 33 priority indicators within
this covering report.  Some key messages are noted below, however it is
demonstrated more fully in the tables from page 4 of Appendix 1.  
3.41 As at June 2025, 17 of our 33 priority indicators were in the top two quartiles.
Top quartile performance includes areas such as proportion of the highest paid
5% of employees who are women, gender pay gap, percentage of invoices
sampled that were paid within 30 days, proportion of total household waste
arising that is recycled, percentage of operational buildings that are suitable for
their current use and town vacancy rates. 
3.42 In the short term (most recent one year period available), 23 of our 33 priority
indicators have shown improvement in performance, whereas ten have
demonstrated a reduction in performance.  In terms of improvement, data shows
our council’s commitment to investment in the road infrastructure is displaying
positive impacts with an improving Road Condition Index across all
classifications.
3.43 In comparison with other councils, eight indicators have improved their quartile,
19 have maintained quartile (nine remaining in the top two quartiles and six in
the 4th quartile) and six have declined.
3.44 The information contained within the LGBF is being used to inform delivery
across our services.
3.45 Key Highlights
• Recent statistics published by the End Child Poverty Coalition showed that child
poverty within North Ayrshire decreased from 29.2% in 2022/23 to 24.3% in
2023/24. This reduction of 4.9 percentage points was the largest in Scotland over
this time period.
• Following a competitive application process, we have been selected as one of
three places to engage in the Collaboration for Health Equity in Scotland (CHES)
programme. Over the next two years, we will work in partnership with Public
Health Scotland and the Institute for Health Equity to reduce health inequity in
North Ayrshire through improving the conditions people live and work in. The
ultimate goal is to enable people to live longer, healthier lives by addressing the
root causes of health inequalities and preventing illness before it starts.
• During 2024/2025, our Money Matters team received 5,842 referrals and secured
£21.5 million in financial gains through income maximisation for service users.
• Our council was successful in becoming one of Scotland’s Fairer Future
Partnerships (FFP).  This £350,000 investment enabled our new Child Poverty
Strategy Team (CPST) to be established in January. It will work with partners to
40

Page 41

test ways of mitigating poverty, through addressing the specific needs of our
communities. In preparation, the team has appointed the Centre of Excellence for
Children’s Care and Protection (CELCIS) as a learning partner
• We published our new Participation Strategy which will focus on raising
awareness of participation processes including locality partnerships and enhance
our budget consultation. 
• Locality Plans were approved at Locality Partnership meetings in September. 
• We have expanded our capacity to support Community Asset Transfers (CATs)
through engaging with our Active Schools team. Our Community Asset Transfer
Team has received 17 expressions of interest during 2024/2025, with 56 council
assets under community management to date.
• Our Financial Inclusion Partnership is developing a communications plan to help
promote services to island residents, our gypsy traveller community, those who
are digitally excluded and residents with disabilities.
• Installation of our council’s two new solar photovoltaic (PV) farms is now
complete with the next phase being the connection to the electricity network and
commissioning works. They are expected to generate £400,000 of revenue per
year over 25 years as well as reduce our carbon footprint.
• 15 households on Cumbrae and 25 in Kilwinning have been identified for
improvements via the Energy Efficient Scotland: Area Based Scheme. This will
help address the impact of energy costs and address fuel poverty. 
• A £17.4m award from the Levelling Up Fund Round 3 was secured from the UK
Government.  This will support Levelling Up for Ayrshire, Commercial and Low
Carbon Infrastructure.
• Cabinet approved the proposal to vacate Bridgegate House in Irvine and consider
future uses as part of the Irvine town centre regeneration work and establishment
of the Irvine Town Board.
• Our most recent Best Value Thematic Audit focusing on Workforce Innovation
was positive, showing how our council is responding to current challenges by
building capacity, increasing productivity and innovation.
• Our Transformation Programme continues to progress, with key milestones
reached within the Digital Workstream, Irvine Property Review as well as the
Nethermains and Shewalton Solar PV Farm detailed above.
• The Transformation Board is overseeing service reviews across the Learning
Resource; Housing Service; Financial Inclusion Services; External Residential
Placements; Economic Development, Growth and Regeneration; and Waste
Services.
• The Irvine Locality Review is progressing to align our operational property estate
to complement modern ways of working.   To date we have:
o Relocated Genealogy from Irvine Townhouse to Irvine Library resulting in
increased footfall. 
o Relocated 255 colleagues to Cunninghame House. 
o Relocated the Eglington Trophy to the Heritage Centre. 
o Approved a £300,000 investment in a Community Wealth Building Initiative to
support the exploration of a wellbeing enterprise hub at the current
Greenwood Conference Centre site.
41

Page 42

3.46 Key Next Steps
We will:
• Through our new Child Poverty Strategy Team – and liaising through the CPP
and CPP Senior Officers Group - continue to bring a more systematic approach
to addressing child poverty in North Ayrshire. This will include the co-design of
mitigations based on the needs of our communities with partners from the third
sector.
• Establish our local priorities and areas for action as part of the Collaboration for
Health Equity in Scotland programme. 
• Consolidate our financial inclusion services and rebrand as “Money Smart”.
• Reach Financial Close on the new state-of-the-art Ardrossan Community
Campus and start the construction process. 
• Review research commissioned by our council into the potential options for
developing Community Wealth Building approaches at a locality level including
consideration of unique island contexts.  
• Explore a debt advice resource for non-council tenants to enable a seamless
internal pathway to debt advice.
• Make progress on the priorities identified through the Community Asset Transfer
Start-up Fund review.
• Complete our comprehensive approach to application, assessment, award and
compliance in relation to community funds and grants.
• Continue to work with the Third Sector Chief Officers Group to codesign solutions
to develop our strategic understanding and the sector’s capacity. These projects
focus on two areas which our council has earmarked funds to support, Child
Poverty and the Cost of Living as well as developing our Community Wealth
Building aims within our communities. 
• Launch our new digital Household Waste Recycling Centre booking system.
• Continue to develop Community Climate Action Plans for our six localities. 
• Continue to develop a Renewable Energy Strategy and identify projects which
may be suitable for investment.
• Deliver the North Ayrshire Network Strategy, aligned with the Scottish
Government’s Biodiversity Strategy.
• Continue to progress recommendations arising from the Audit Scotland Best
Value Thematic Work.
• Continue to progress property rationalisation.
• Commence preparations for our budget engagement for 2026 to 2027.
• Continue to carry out essential works at both Nethermains and Shewalton Solar
PV Farms. 
42

Page 43

4 Proposals 
4.1 Cabinet agrees to: 
The Audit and Scrutiny Committee agrees to: 
i. Consider progress within the LGBF Report as at June 2025 (Appendix 1). 
ii. Consider Our Council Plan Six Monthly Progress Report 1 October to 31
March 2025 (Appendix 2).
iii. Consider Our Council Plan Annual Performance Report (Appendix 3).
iv. Note Cabinet approval relates to the content of the report, not the layout or
media used to ensure future flexibility for production of accessible format
reports. 
5 Implications/Socio-economic Duty
Financial
5.1 There are no financial implications arising from this report.
Human Resources
5.2 There are no human resource implications arising from this report.
Legal
5.3 There are no legal implications arising from this report.
Equality/Socio-economic
5.4 There are no equality/socio-economic implications arising from this report.
Climate Change and Carbon
5.5 There are no climate change and carbon implications arising from this report.
Key Priorities
5.6 The Progress Report enables the effective scrutiny of the delivery of our Council
Plan strategic priorities.
Community Wealth Building
5.7 There are no Community Wealth Building implications arising from this report.
Islands Communities Impact Assessment (ICIA)
5.8 There are no island communities implications arising from this report.
United Nations Rights of the Child (UNCRC)
5.9 The Audit and Scrutiny Committee is asked to note that the Cabinet approval of
the report relates to the content only, this enables us to explore child friendly
reporting in line with the UNCRC (Incorporation) (Scotland) Act 2024 while
ensuring effective governance.  
43

Page 44

Consumer Duty
5.10 There are no consumer duty implications arising from this report.
6 Consultation
6.1 The Executive Leadership Team (ELT) and Cabinet reviewed and scrutinised the
report prior to submission to the Audit and Scrutiny Committee. 
Aileen Craig
Head of Service (Democratic)
For further information please contact Isla Cruickshanks, Senior Manager (Policy,
Performance and Democracy) on 01294 324035 or email IslaCruickshanks@north-
ayrshire.gov.uk.
44

Page 45

Local Government
Benchmarking Framework
Analysis of June 2025
Data Release
Appendix 1
45

Page 46

LGBF Analysis of June 2025 Data Release Page 1 of 32
Contents
Introduc�on ................................................................................................................................... 2
LGBF Priority Indicators .................................................................................................................. 3
People Services ........................................................................................................................................... 8
CHN11 – Proportion of pupils entering positive destinations .............................................................................. 11
CHN17 – Percentage of children meeting development milestones (27-30 month Review) ............................... 12
CHN24 – Proportion of Children Living in Poverty After Housing Costs ............................................................... 12
ECON1 – Percentage of Unemployed People Assisted into work from Council Programmes ............................. 13
ECON12a – Claimant Count as a percentage of working age population ............................................................. 14
ECON12b - Claimant Count as a percentage of 16-24 population........................................................................ 14
ECON7 – Proportion of people earning less than the living wage ........................................................................ 15
ECON9 – Town Vacancy Rates .............................................................................................................................. 16
ENV3c – Street Cleanliness Score ......................................................................................................................... 16
HSN1b – Gross Rent Arrears (All Tenants) as a Percentage of rent due for the year ........................................... 17
HSN3 – Proportion of Council dwellings meeting Scottish Housing Quality Standards ....................................... 17
HSN5a – Proportion of council dwellings that are energy efficient ..................................................................... 18
CORP7 – Percentage of income due from Council Tax received by the end of the year ...................................... 18
CORP9 – Percentage of Scottish Welfare Fund Crisis Grant decisions within one day ........................................ 19
CORP10 – Percentage of Scottish Welfare Fund Community Care Grant decisions in 15 days ........................... 19
Other Services ........................................................................................................................................... 20
CLIM1 – CO2 emissions area wide per capita ....................................................................................................... 24
CLIM2 – CO2 emissions area wide: emissions within scope of Local Authority per capita .................................. 24
CLIM3 -CO2 emissions from transport per 1000 population ................................................................................ 25
CLIM4 – CO2 emissions from electricity per 1000 population ............................................................................. 25
CLIM5 – CO2 emissions from natural gas per 1000 population ........................................................................... 26
ECON10 – Immediate available employment land as percentage of total land allocated for employment
purposes................................................................................................................................................................ 26
ECON11 – Gross value added (GVA) per capita .................................................................................................... 27
ECON5 – No of business gateway start–ups per 10,000 population .................................................................... 27
ECON4 – Proportion of procurement spent on local enterprises ......................................................................... 28
ENV4b - Percentage of A class roads considered for maintenance treatment .................................................... 30
ENV4c - Percentage of B class roads considered for maintenance treatment ..................................................... 30
ENV4d - Percentage of C class roads considered for maintenance treatment..................................................... 30
ENV4e - Percentage of unclassified roads considered for maintenance treatment ............................................ 30
ENV6 – Percentage of total household waste arising that is recycled ................................................................. 30
CORP3b – Percentage of the highest paid 5% of employees who are women .................................................... 31
CORP3c – Gender Pay Gap .................................................................................................................................... 31
CORP8 – Percentage of invoices sampled that were paid within 30 days ............................................................ 32
CORP-ASSET1 – Percentage of operational buildings that are suitable for their current use .............................. 32
46

Page 47

LGBF Analysis of June 2025 Data Release Page 2 of 32
Introduction
The Local Government Benchmarking Framework (LGBF) provides an opportunity to benchmark our
performance with other local authorities in Scotland. It is administered by the Improvement Service
in partnership with the Society of Local Authority Chief Executives (SOLACE) and highlighted within
the Accounts Commission’s Statutory Performance Information Direction 2021 which defines how
local authorities should demonstrate they are achieving Best Value for the people they serve. 
We have identified 33 indicators that closely link to the priorities within our Council Plan. Data for
these indicators is released in phases during the year. Areas such as CO2 emissions, Gross Value
Added and claimant count are included as priority indicators as they are monitored by our council to
reflect our operating environment, though we have limited influence on these areas directly. This
section demonstrates our relative performance for these indicators as at the June 2025 data release.
This information alongside the LGBF Dashboard enables us to learn from others to improve services
for our residents.
LGBF performance is viewed in short, medium or long-term trends in terms of our actual
performance as well as our position relative to other councils.  In addition, the range of indicators
contains those directly reflecting council performance, those where performance is weighted by our
demographics (per 10,000 population for example) or contextual (Gross Value Added and area wide
CO2 emissions) to reflect our operating environment.  This complex landscape means it is difficult to
summarise effectively across all 33 priority indicators within this introduction.  Some key messages
are noted below, however it is demonstrated more fully in the following pages.
As at June 2025, 17 of our 33 priority indicators are in the top two quartiles. Top quartile
performance includes areas such as proportion of the highest paid 5% of employees who are women,
percentage of invoices sampled that were paid within 30 days, proportion of total household waste
arising that is recycled, percentage of operational buildings that are suitable for their current use and
town vacancy rates.
In the short term (most recent one year period available), 23 of our 33 priority indicators have shown
improvement in performance, whereas ten have demonstrated a reduction in performance. Some of
the indicators which have improved are proportion of children living in poverty (after housing costs),
proportion of Scottish Welfare Fund (SWF) Community Care Grant decisions within 15 days and
street cleanliness score.  In terms of improvement, data shows our council’s commitment to
investment in the road infrastructure is displaying positive impacts with an improving Road Condition
Index across all classifications.
The following is a breakdown of the priority indicators within the context of family groups. Family
groups enable local authorities to make as close to a like for like comparison as possible with other
councils by grouping those with similar traits depending on the indicator. Grouping is based on levels
of deprivation (people services) or rurality (other services).  We align our LGBF analysis to the family
groups used within the LGBF Dashboard.  These are: 
Peoples Services (Deprivation)
• North Ayrshire Council
• Comhairle nan Eilean Siar
• Dundee City Council
• East Ayrshire Council
• North Lanarkshire Council
• Inverclyde Council
• West Dunbartonshire Council
• Glasgow City Council
Other Services (Rurality)
• North Ayrshire Council
• Perth and Kinross
• S�rling Council
• Moray Council
• South Ayrshire Council
• East Ayrshire Council
• East Lothian Council
• Fife Council
47

Page 48

LGBF Analysis of June 2025 Data Release Page 3 of 32
LGBF Priority Indicators
The table below displays the short term (or prior year) comparison of the performance, rank and quartile for the 33 priority LGBF indicators. To assess
performance, the terms ‘improved’ or ‘declined’ are used in this report. This terminology is used as for some indicators a value increasing is improved
performance however for other indicators, a value increasing is declining performance. Each indicator listed is an active html link to the chart further in this
document that provides more information on trends, relative performance and comments on performance.
In summary, of the 33 indicators over the short term:
• Performance has improved for 23 (69.7%) and declined for 10 (30.3%)
• Rank has improved for 18 (54.5%), declined for 11 (33.3%), and stayed the same for 4 (12.1%)
• Quar�le has improved for 8 (24.2%), declined for 6 18.2%), and stayed the same for 19 (57.6%)
Key
Performance has improved
Performance has stayed the same
Performance has declined
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CHN11 - Proportion of pupils
entering positive destinations
(CP_07)
2023-24 96.50% 95.60% 8 19 1 3
CHN – 17 Proportion of Children
meeting developmental
milestones (CP_04)
2023-24 79.50% 77.50% 26 31 4 4
48

Page 49

LGBF Analysis of June 2025 Data Release Page 4 of 32
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CHN24 - Proportion of children
living in poverty (after housing
costs)
2023-24 29.20% 24.30% 31 24 4 3
CLIM01 - CO2 emissions area
wide per capita 2022-23 4.95 4.64 20 18 3 3
CLIM02 - CO2 emissions area
wide: emissions within scope of
LA per capita
2022-23 5.29 4.97 22 21 3 3
CLIM03 - CO2 emissions from
Transport per capita 2023-24 30.92 29.54 25 22 4 3
CLIM04 - CO2 emissions from
electricity per capita 2023-24 45.16 45.83 23 16 3 2
CLIM05 - CO2 emissions from
natural gas per capita 2023-24 71.75 72.2 24 25 3 4
CORP03b - Proportion of the
highest paid 5% of employees
who are women
2023-24 61.3% 64.7% 10 3 2 1
CORP3c – Gender Pay Gap 2023-24 1.10%% 0.0% 11 7 2 1
CORP07 - Percentage of income
due from Council Tax received
by the end of the year (CP_48)
2023-24 94.7% 93.6% 29 30 4 4
CORP08 - Percentage of invoices
sampled that were paid within
30 days
2023-24 93.3% 95.8% 11 7 2 1
49

Page 50

LGBF Analysis of June 2025 Data Release Page 5 of 32
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CORP09 - Proportion of SWF
Crisis Grant decisions within 1
day
2024-25 99.0% 99.3% 8 8 1 1
CORP10 - Proportion of SWF
Community Care Grant decisions
within 15 days
2024-25 99.0% 99.1% 10 11 2 2
CORP-ASSET01 - % of
operational buildings that are
suitable for their current use
(CP_19)
2023-24 95.1% 95.2% 6 6 1 1
ECON01 - Percentage of
Unemployed People Assisted
into work from Council
Programmes
2023-24 21.4% 19.8% 7 10 1 2
ECON04 - Proportion of
procurement spent on local
enterprises
2023-24 24.1% 23.8% 20 19 3 3
ECON05 - No of business
gateway start-ups per 10,000
population
2024-25 12.4 8.1 20 32 3 4
ECON07 - Proportion of people
earning less than the living wage 2023-24 11.7% 10.7% 5 9 1 2
ECON09 - Town Vacancy Rates 2023-24 7.4% 7.8% 7 6 1 1
ECON10 - Immediate available
employment land as a % of total
land allocated for employment
purposes
2023-24 46.3% 42.7% 7 9 1 2
50

Page 51

LGBF Analysis of June 2025 Data Release Page 6 of 32
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
ECON11 - Gross Value Added
(GVA) per capital 2023-24 £20,301 £20,910 26 25 4 4
ECON12a - Claimant Count as a
% of Working Age Population 2024-25 4.4% 4.3% 30 31 4 4
ECON12b - Claimant Count as %
of 16-24 Population 2024-25 5.9% 5.8% 32 32 4 4
ENV03c - Street Cleanliness
Score (CP_27) 2024-25 89.1% 90.3% 24 20 3 3
ENV04b - Percentage of A class
roads considered for
maintenance treatment
2022-24 30.70% 28.9% 27 21 4 3
ENV04c - Percentage of B class
roads considered for
maintenance treatment
2022-24 28.90% 27.4% 19 13 3 2
ENV04d - Percentage of C class
roads considered for
maintenance treatment
2022-24 39.90% 38.50% 27 26 4 4
ENV04e - Percentage of
unclassified roads considered for
maintenance treatment
2020-24 35.40% 32.40% 16 11 2 2
ENV06 - Proportion of total
household waste arising that is
recycled (CP_31)
2023-24 55.3% 56.1% 4 3 1 1
HSN01b - Gross rent arrears (all
tenants) as a percentage of rent
due for the year (CP_47)
2023-24 7.1% 5.9% 6 4 1 1
51

Page 52

LGBF Analysis of June 2025 Data Release Page 7 of 32
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
HSN03 - Proportion of council
dwellings meeting Scottish
Housing Quality Standards
(CP_25)
2023-24 63.2% 76.9% 16 16 2 2
HSN05a - Proportion of council
dwellings that are energy
efficient (CP_44)
2021-22 97.6% 97.7% 2 4 1 1
52

Page 53

LGBF Analysis of June 2025 Data Release Page 8 of 32
People Services
The table below displays the short term, medium term and long term comparisons against our current year for our 15 priority indicators within the People
Services family group. Where a 10 year (long term) trend is not available, the most historical figure has been used for the long term comparison. Each
indicator is linked to a chart in the following pages for more information.
In summary, of the 15 indicators our over the short, medium and long term.
• Short Term Family Group Rank – Improved 3 (20%), declined 5 (33.33%) and stayed the same 7 (46.66%)
• Medium Term Family Group Rank – Improved 7 (46.66%), declined 2 (13.33%) and stayed the same 6 (40%)
• Long Term Family Group Rank – Improved 1 (6.66%), declined 10 (66.66%) and stayed the same 4 (26.66%)
Short Term, Medium Term and Long Term
Comparisons for our People Services Family
Group
Current Year Short Term Comparison Medium Term Comparison Long term Comparison
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
CHN11 - Proportion of pupils entering
positive destinations 2023-24 4 2022-23 3 2020-21 5 2013-14 2
CHN17 - Percentage of children meeting
development milestones 2023-24 7 2022-23 4 2020-21 4 2013-14 1
CHN24 - Proportion of Children Living in
Poverty After Housing Costs 2023-24 4 2022-23 7 2020-21 7 2014-15 7
53

Page 54

LGBF Analysis of June 2025 Data Release  Page 9 of 32
Short Term, Medium Term and Long Term
Comparisons for our People Services Family
Group 
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
ECON1 - Percentage of Unemployed People
Assisted into work from Council
Programmes
2023-24 5 2022-23 4  2020-21 6  2013-14 4 
ECON12a - Claimant Count as a percentage
of working age population 2024-25 2 2023-24 2  2021-22 3  2014-15 1 
ECON12b - Claimant Count as a percentage
of 16-24 population 2024-25 1 2023-24 1  2021-22 1  2014-15 1 
ECON7 - Proportion of people earning less
than the living wage 2023-24 3 2021-22 4  2019-20 3  2012-13 5 
ECON9 - Town Vacancy Rates 2023-24 3 2022-23 2  2020-21 4  2014-15 2 
ENV3c - Street Cleanliness Score 2024-25 4 2023-24 4  2021-22 5  2014-15 6 
54

Page 55

LGBF Analysis of June 2025 Data Release  Page 10 of 32
Short Term, Medium Term and Long Term
Comparisons for our People Services Family
Group 
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
HSN1b - Gross Rent Arrears (All Tenants) as
a Percentage of rent due for the year 2023-24 1 2022-23 1  2020-21 1  2013-14 1 
HSN3 - Proportion of Council dwellings
meeting Scottish Housing Quality Standards 2023-24 4 2022-23 4  2020-21 2  2013-14 1 
HSN5a - Proportion of council dwellings that
are energy efficient 2021-22 2 2020-21 2  2018-19 1  2015-16 1 
CORP7 - Percentage of income due from
Council Tax received by the end of the year 2023-24 7 2022-23 7  2020-21 8  2013-14 2 
CORP9 - Percentage of Scottish Welfare
Fund Crisis Grant decisions within one day 2024-25 4 2023-24 3  2021-22 4  2018-19 3 
CORP10 - Percentage of Scottish Welfare
Fund Community Care Grant decisions in 15
days
2024-25 2 2023-24 4  2021-22 3  2018-19 2 
55

Page 56

LGBF Analysis of June 2025 Data Release Page 11 of 32
(Please note, axis scales used within the following charts vary to ensure trends are visible.)
CHN11 – Proportion of pupils entering positive destinations
The current proportion of pupils entering positive destinations is 95.6% for 2023 to 2024. Despite a
slight decrease from 2022 to 2023 (which represented our highest figure on record), our
performance on this indicator is consistently strong, with the only local authorities that are currently
higher in terms of pupils entering positive destinations being Glasgow City (95.7%), West
Dunbartonshire (96%) and Eilean Siar Councils (97.8%). 
Data for this indicator is published by the Scottish Government in its ‘School leaver initial destinations
and attainment survey’, which collects information on the destination of school leavers (from publicly
funded mainstream schools) in September. A school leaver is defined as a young person of school
leaving age, who left school during or at the end of the school year. The school year runs from 1
August to 31 July. Data on initial destinations of school leavers is based on approximately three
months after the end of the school term and their post review (previously post appeal) attainment
information. This publication covers school leavers from all stages of secondary school. For most
young people, S4 (15 to 16 year olds) is the last compulsory year of school, but the majority choose
to stay on and complete S5 (16 to 17 year olds) and S6 (17 to 18 year olds). School leavers who
moved away from Scotland are not included in the results.
56

Page 57

LGBF Analysis of June 2025 Data Release Page 12 of 32
CHN17 – Percentage of children meeting development milestones (27-30 month
Review)
Currently 77.5% (2023 to 2024) of children are meeting developmental milestones which is a decline
from 79.5% (2022/2023) with only one authority, East Ayrshire 77.3% performing less well within our
family group (and nationally). We currently sit lower than both our Family Group Average (79.8%)
and the National Average (83.3%) and remain in the 4th Quartile. We are working to ensure there is
more robust data gathering and analysis within Early Years and are moving towards using CfE levels
with inbuilt milestones.  This will help improve accuracy and consistency of data as well as improved
progression pathways to primary.  Roles and remits for Excellence and Equality Leads (EELs)
developed this academic session will support this work. This is an area that we also know will need
specific focus within wider principles of prevention and early intervention, including through the
Collaboration for Health Equity in Scotland.      
CHN24 – Proportion of Children Living in Poverty After Housing Costs
The most recent data release shows 24.3% of our children in North Ayrshire are living in poverty
(after housing costs) – a decrease of 4.9 percentage points since the previous year - this is below the
57

Page 58

LGBF Analysis of June 2025 Data Release Page 13 of 32
family group average of 25.3% and is the largest decrease of all Scottish councils. Four councils within
our family group have a higher proportion of children living in poverty (after housing costs): Glasgow
City (36.1%), Dundee City (26.1%), North Lanarkshire (24.9%) and West Dunbartonshire (25.2%)
Councils. At a national level, the introduction of the Scottish Child Payment is thought to have been
significant.  Whilst further analysis is required to determine what has been most impactful in
reducing child poverty at a local level across North Ayrshire, our council is continually working to
address barriers to employment as well as ensuring families are aware of, and can access, the
support they are entitled to.
ECON1 – Percentage of Unemployed People Assisted into work from Council Programmes
Currently 19.8% (2023 to 2024) of unemployed people are assisted into work from council
programmes. Within our family group, Eilean Siar (30.8%), Inverclyde (24.2%), North Lanarkshire
(22.7%) and West Dunbartonshire (29.3%) Councils are all currently reporting a higher percentage of
unemployed people assisted into work, however for context North Ayrshire has the second highest
claimant count as a percentage of working population and the highest for those aged 16 to 24 years
(see charts below). In 2023 to 2024, the family group average was 20.1% and the national average
was 12.1%. Addressing the level of unemployment and the delivery of such support and programmes
remains a priority. This also includes a focus on the maximisation of job opportunities available
within local enterprises and through new inward investment.
58

Page 59

LGBF Analysis of June 2025 Data Release Page 14 of 32
ECON12a – Claimant Count as a percentage of working age population
North Ayrshire had the second highest claimant count rates as a percentage of working age
population within our family group for 2024 to 2025 at 4.3%. Only Glasgow City Council with 5% has a
higher claimant count. Through the work of the Employability and Skills Team, the Local
Employability Partnership (LEP) and the extensive network of working relationships the focus on
working age employment will continue to improve the outcomes and reduce the claimant count.
ECON12b - Claimant Count as a percentage of 16-24 population
North Ayrshire had the highest claimant count as a percentage of population aged 16 to 24 years
within our family group at 5.8%. North Ayrshire continues to have the highest level across Scotland
but maintains a sharp focus on engaging and supporting young people into employment. The
Employability Team recently launched youth hubs working in partnership with the Department for
Work and Pensions (DWP) and Skills Development Scotland to support our young people. A
59

Page 60

LGBF Analysis of June 2025 Data Release Page 15 of 32
participant recruitment incentive has supported those we are supporting into employment by
adopting targeting interventions to open opportunities for our young people who are disadvantaged
in the labour market. The team has increased their focus on youth transitions, progression and
tracking and will continue this to improve outcomes for our young people. Through the keyworker
support, they continue to provide in work support to improve employment retention.  Through the
work of the Employability and Skills Team, the LEP and the extensive network of working
relationships this focus on youth employment will continue to improve the outcomes and reduce the
youth claimant count
ECON7 – Proportion of people earning less than the living wage
We currently have 10.7% (2023 to 2024) of people earning less than the living wage. Currently we are
ranked 3rd in our family group (behind Glasgow City and Dundee City Councils). 2023 to 2024 data is
not available for Argyll and Bute, East Renfrewshire, Eilean Siar, Midlothian, Orkney Islands and
Shetland Islands Councils. The national average is currently 10.2% and the Family Group Average is
11.4%. North Ayrshire Council is performing strongly in supporting employers to pay the Real Living
Wage. This has been supported by the work led by Employability Team through Fair Work and Skills
and aligning fair work to the continuing Ayrshire Skills Investment Fund to support more employers
to pay the Real Living Wage (RLW).
60

Page 61

LGBF Analysis of June 2025 Data Release  Page 16 of 32
ECON9 – Town Vacancy Rates 
Town Vacancy rates have increased from 7.4% in 2022 to 2023 to 7.8% in 2023 to 2024. Town
vacancy rates are a measure of the performance of our town centres and cannot be viewed in
isolation. A suitable mix of various retail and service organisations in our towns is crucial to support
ongoing regeneration. Although we have seen a slight increase, we are still currently below the family
group average of 11.2% and the national average of 12.3%. Town centres remain a priority and focus
for the Regeneration Team and for national funding opportunities including the Place Based
Investment Programme and the Plan for Neighbourhoods, formerly the Long-Term Plan for Towns.
Programmes such as the Repurposing Property Grant Fund aim to contribute to further improving
the vacancy rates alongside our Business Support and Development activities.
ENV3c – Street Cleanliness Score 
Our Street Cleanliness Score for 2024 to 2025 was 90.3% which is improved from 89.1% in 2023
to2024, this has resulted in an improvement in rank and quartile, moving our council from the 4th to
the 3rd quartile. In 2024 to 2025 we performed higher than our family group average (88.9%) but
slightly lower than the national average (91.7%).  East Ayrshire (92.6%), Eilean Siar (92.4%) and
Inverclyde (91.1%) Councils are the only authorities within our family group that have a higher street
cleanliness score.
61

Page 62

LGBF Analysis of June 2025 Data Release Page 17 of 32
HSN1b – Gross Rent Arrears (All Tenants) as a Percentage of rent due for the year
The gross rent arrears (all tenants) as a percentage of rent due for the year was 5.9%. This is lower
than the family group average of 8.3% as we are the strongest performing local authority in our
family group. Between 2022 and 2024 we have risen in rank from 6th to 4th. We remain in the 1st
quartile. Our most recent local data shows that the estimated percentage for 2024 to 2025 is 8.03%.
HSN3 – Proportion of Council dwellings meeting Scottish Housing Quality Standards
The proportion of Council dwellings meeting Scottish Housing Quality Standard (SHQS) for the
reporting period was 76.9%, in comparison only West Dunbartonshire Council reported a lower
compliance rate which was 51.2%. The SHQS incorporates the Energy Efficiency Standard for Social
Housing (EESSH), along with another 54 tests that must be satisfied prior to a property passing. The
main challenge for North Ayrshire has been gaining access to properties to carry out statutory
compliance works (EICR).  However, this has improved throughout 2024 to 2025 and the updated
local figure for 2024 to 25 is 94%.
62

Page 63

LGBF Analysis of June 2025 Data Release  Page 18 of 32
HSN5a – Proportion of council dwellings that are energy efficient 
The proportion of council dwellings that are energy efficient remains high, with performance
improving slightly from 97.6% in 2020 to 2021 to 97.7% in 2021 to 2022. This is the second strongest
performance in our family group behind East Ayrshire Council and higher than the Scottish average of
87.6%. To improve the relevance of this measure, the basis on which it is calculated was changed in
2019 to 2020. It is now based on progress towards meeting the Energy Efficiency Standard for Social
Housing (EESSH). Data for this indicator for 2022 to 2023 onwards has not been collected or
published due to the Scottish Government review of EESSH2.  (As reported in our Mid-Year report).
However, we can confirm our locally recorded figures for 2022 to 2023 was 98.2%, for 2023 to 2024
it was 98.01% and for 2024 to 2025 it was 97.66%
CORP7 – Percentage of income due from Council Tax received by the end of the year 
The most recent data release shows that 93.6% of income due from Council Tax was received by the
end of the year compared to the family group average of 94.2%. We remain in the 4th quartile as we
have declined from 29th to 30th in the rankings. We are currently performing less strongly than our
family group with only West Dunbartonshire Council having a lower percentage of income due by the
end of the year (93.2%).
63

Page 64

LGBF Analysis of June 2025 Data Release Page 19 of 32
CORP9 – Percentage of Scottish Welfare Fund Crisis Grant decisions within one day
The most recent data shows that 99.3% of Scottish Welfare Fund Crisis Grant decisions were made
within one day. Only Eilean Siar and Inverclyde Councils had a higher percentage with both
authorities reaching 100%. 
CORP10 – Percentage of Scottish Welfare Fund Community Care Grant decisions in 15 days
The percentage of Scottish Welfare Fund Community Care Grant decisions in 15 days was 99.1%.
Only Eilean Siar (94.3%) and Inverclyde (99.4%) Councils currently have a higher percentage of
Scottish Welfare Fund Community Care Grant decisions in 15 days
64

Page 65

LGBF Analysis of June 2025 Data Release Page 20 of 32
Other Services
The table below displays the short term, medium term and long term comparisons against our current year for 18 priority indicators within our Other Services
family group. Where a 10 year (long term) trend is not available, the most historical figure has been used for the long term comparison. Each indicator is
linked to a chart in the following pages for more information.
In summary, of the 18 indicators our over the short, medium and long term.
• Short Term Family Group Rank – Improved 8 (44.44%), declined 4 (22.22%) and stayed the same 6 (33.33%)
• Medium Term Family Group Rank – Improved 9 (50%), declined 4 (22.22%) and stayed the same 5 (27.77%)
• Long Term Family Group Rank – Improved 9 (50%), declined 1 (6.66%) and stayed the same 8 (44.44%)
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison Medium Term Comparison Long term Comparison
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
CLIM1 – CO2 emissions area wide per capita 2022-23 4 2021-22 5 2019-20 5 2012-13 5
CLIM2 – CO2 emissions area wide: emissions
within scope of Local Authority per 2022-23 4 2021-22 4 2019-20 4 2012-13 5
CLIM3 -CO2 emissions from transport per
1000 population 2023-24 6 2022-23 6 2020-21 6 2017-18 6
65

Page 66

LGBF Analysis of June 2025 Data Release  Page 21 of 32
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CLIM4 – CO2 emissions from electricity per
1000 population 2023-24 3 2022-23 7  2020-21 7  2017-18 6 
CLIM5 – CO2 emissions from natural gas per
1000 population 2023-24 8 2022-23 8  2020-21 7  2017-18 8 
ECON10 – Immediate available employment
land as percentage of total land allocated for
employment purposes
2023-24 2 2022-23 1  2020-21 3  2014-15 7 
ECON11 – Gross value added (GVA) per
capita 2023-24 6 2022-23 6  2020-21 6  2013-14 6 
ECON5 – No of business gateway start – ups
per 10,000 population 2024-25 8 2023-24 6  2021-22 7  2014-15 5 
ECON4 – Proportion of procurement spent
on local enterprises 2023-24 6 2022-23 5  2020-21 7  2013-14 6 
66

Page 67

LGBF Analysis of June 2025 Data Release Page 22 of 32
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison Medium Term Comparison Long term Comparison
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
ENV4b - Percentage of A class roads
considered for maintenance treatment 2022-24 6 2021-23 7 2019-21 7 2012-14 6
ENV4c - Percentage of B class roads
considered for maintenance treatment 2022-24 3 2021-23 3 2019-21 4 2012-14 7
ENV4d - Percentage of C class roads
considered for maintenance treatment 2022-24 8 2021-23 7 2019-21 8 2012-14 8
ENV4e - Percentage of unclassified roads
considered for maintenance treatment 2020-24 3 2019-23 4 2017-21 4 2010-14 5
ENV6 – Percentage of total household waste
arising that is recycled 2023-24 1 2022-23 2 2020-21 4 2013-14 1
CORP3b – Percentage of the highest paid 5%
of employees who are women 2023-24 1 2022-23 3 2020-21 1 2013-14 1
67

Page 68

LGBF Analysis of June 2025 Data Release  Page 23 of 32
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CORP3c – Gender Pay Gap 2023-24 2 2022-23 3  2020-21 3  2015-16 5 
CORP8 – Percentage of invoices sampled
that were paid within 30 days 2023-24 2 2022-23 3  2021-22 1  2014-15 3 
CORP-ASSET1 – Percentage of operational
buildings that are suitable for their current
use
2023-24 3 2022-23 3  2020-21 2  2013-14 4 
68

Page 69

LGBF Analysis of June 2025 Data Release  Page 24 of 32 
(Please note, axis scales used within the following charts vary to ensure trends are visible.)
CLIM1 – CO2 emissions area wide per capita 
Currently our CO2 Emissions Area wide per Capita is 4.64tCO2e. Perth and Kinross (4.68), Fife (7.81)
and East Lothian (10.02) Councils currently rank higher in our family group. In the production of the
2022 estimates, new data was introduced, together with some improvements to the underlying
methodology. To ensure that the data for 2005 to 2021 is consistent with the data now available for
2022, the estimates for these years have been revised to incorporate both the new data and the
improvements in the underlying methodology. For some local authorities, these revisions have
resulted in noticeable changes to the emissions estimates in historic years, with only slight changes
for North Ayrshire.
CLIM2 – CO2 emissions area wide: emissions within scope of Local Authority per capita 
Currently our CO2 emissions area wide: emissions within scope of local authority per capita is
4.97tCO2e compared to Perth & Kinross (5.90), South Ayrshire (5.11) Stirling (5.74) and Moray (6.94)
Councils. In the production of the 2022 estimates, new data was introduced, together with some
improvements to the underlying methodology. To ensure that the data for 2005 to 2021 is consistent
69

Page 70

LGBF Analysis of June 2025 Data Release Page 25 of 32
with the data now available for 2022, the estimates for these years have been revised to incorporate
both the new data and the improvements in the underlying methodology. For some local authorities,
these revisions have resulted in noticeable changes to the emissions estimates in historic years, with
only slight changes for North Ayrshire.
CLIM3 -CO2 emissions from transport per 1000 population
Currently our CO2 emissions from transport per capita is 29.54tCO2e for 2023 to 2024. Only Moray
and Fife Councils have higher emissions from transport per capita with 38.64 and 32.67 respectively.
CLIM4 – CO2 emissions from electricity per 1000 population
Currently our CO2 emissions from electricity per capita is 45.83tCO2e for 2023 to 2024. Only Perth
and Moray Councils currently have lower CO2 emissions per capita from electricity with 33.70 and
32.61 respectively.
70

Page 71

LGBF Analysis of June 2025 Data Release  Page 26 of 32
CLIM5 – CO2 emissions from natural gas per 1000 population 
Currently our CO2 emissions from natural gas per capita is 72.20tCO2e. We have the highest
emissions within our family group by a significant margin.
ECON10 – Immediate available employment land as percentage of total land allocated for
employment purposes 
In North Ayrshire, immediately available employment land as a percentage of total land allocated for
employment purposes is 42.7%. Only East Ayrshire Council has a higher percentage with 42.8%.
Attracting and securing inward investment opportunities remains a priority.
71

Page 72

LGBF Analysis of June 2025 Data Release Page 27 of 32
ECON11 – Gross value added (GVA) per capita
Gross Value Added (GVA) is something we can help influence as a local authority; however, it relies
on all industry within North Ayrshire and is monitored for context.
ECON5 – No of business gateway start–ups per 10,000 population
At year end 2024 to 2025, we had 8.1 business gateway start-ups per 10,000 population. Data for this
indicator is available on a monthly basis. The yearly values represent an average of the monthly
values. The ongoing review of Economic Development Growth and Regeneration services will provide
greater focus on business start-up activity.
72

Page 73

LGBF Analysis of June 2025 Data Release  Page 28 of 32
ECON4 – Proportion of procurement spent on local enterprises 
This indicator is a useful comparison for benchmarking purposes; however, it does not capture all
spend as detailed in our 2020 to 2021 Mid-Year Council Plan Progress Report. “The LGBF calculation
excludes certain spend, most notably it excludes all suppliers spend below £1,000 and excludes all
suppliers not categorised as core trade organisations. This is Local Government Benchmarking
Framework is therefore not an accurate reflection of the economic activity within North Ayrshire. As
we have access to the source data used by the LGBF we are able to capture all spend data and refine
the calculation at a local level to better capture our spend with local enterprises and shorten the time
delay in reporting.” Our local figure for 2023 to 2024 was 24.48% which, though not a direct
comparison with the LGBF measure, would put us ranked 4th in our family group and 19th nationally.”
Our most recent local figure is 26.8% for 2024 to 25. 
73

Page 74

LGBF Analysis of June 2025 Data Release Page 29 of 32
Percentage of A Class Roads Considered for Maintenance Treatment   Percentage of B Class Roads Considered for Maintenance Treatment
Percentage of C Class Roads Considered for Maintenance Treatment  Percentage of Unclassified Roads Considered for Maintenance Treatment
74

Page 75

LGBF Analysis of June 2025 Data Release  Page 30 of 32  
ENV4b - Percentage of A class roads considered for maintenance treatment
Within North Ayrshire the Percentage of A class roads considered for maintenance treatment is
28.9%. This indicates improvement of 1.8% from figures reported in 2023 and is equal to the Scottish
Average for A class roads. (Chart on previous page.)
ENV4c - Percentage of B class roads considered for maintenance treatment
Within North Ayrshire the Percentage of B class roads considered for maintenance treatment is
27.4%. This indicates an improvement of 1.5% and is below the Scottish average of 32.5% (Chart on
previous page.)
ENV4d - Percentage of C class roads considered for maintenance treatment
Within North Ayrshire the Percentage of C class roads considered for maintenance treatment is
38.5%. This indicates an improvement of 1.4%. (Chart on previous page.)
ENV4e - Percentage of unclassified roads considered for maintenance treatment
Within North Ayrshire the Percentage of unclassified roads considered for maintenance treatment is
32.4%. This indicates an improvement of 3% and is below the Scottish average of 36.2% (Chart on
previous page.)
Overall, data shows our council’s commitment to investment in the road infrastructure is displaying
positive impacts with an improving Road Condition index across all classifications.
ENV6 – Percentage of total household waste arising that is recycled 
The most recent percentage of total house waste arising that is recycled was 56.1% and our family
group average was 52.3%. This is the strongest performance within our family group. The estimated
household waste recycling figure for the calendar year 2024 is 52.8%, subject to verification by SEPA.
This has reduced from 2023 as a result of the introduction of the new SEPA guidance regarding the
requirement for Waste Upholstered Domestic Seating (WUDS) to only be sent for incineration, which
has negatively affected the amount of bulky waste that can be recycled (this will affect all Councils),
as well as increased contamination levels within the purple bin for glass, cans and plastics. A
reduction in organic waste arisings in 2024 and increased contamination has also contributed to the
reduction in performance, as well as more wood being deposited at recycling centres that was only
suitable for biomass recovery and not for recycling.
75

Page 76

LGBF Analysis of June 2025 Data Release  Page 31 of 32  
CORP3b – Percentage of the highest paid 5% of employees who are women 
64.7% of our highest paid 5% of employees are women. This is the highest in our family group. 
CORP3c – Gender Pay Gap 
The most recent figures reported for North Ayrshire Council show that the average hourly rates for
women and men are identical, indicating no gender pay gap for 2023-24. This is below both the
national (2.5%) and family group (2.1%) average. 
76

Page 77

LGBF Analysis of June 2025 Data Release Page 32 of 32
CORP8 – Percentage of invoices sampled that were paid within 30 days
The percentage of invoices sampled that were paid within 30 days was 95.8%, compared to the
89.5% family group average. We are currently second highest in our family group with only Fife
Council (96.4%) having a higher percentage.
CORP-ASSET1 – Percentage of operational buildings that are suitable for their current use
The percentage of operational buildings that are suitable for their current use is currently 95.2%. This
is the third highest with Perth and Kinross (96%) and Moray (97.4%) Councils having stronger
performance.
77

Page 78

Local Government Benchmarking Framework – June 2025 Analysis Page 33 of 24
We strive to make our reporting as accessible as possible.  If you have any
questions or require further information on our Council’s performance please
contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance
78

Page 79

Our Council Plan
Six Monthly
Progress Report
1 October 2024 to
31 March 2025 
Appendix 2
79

Page 80

Contents
Our Performance at a Glance ................................................................................................. 1
Welcome ................................................................................................................................. 2
Wellbeing ....................................................................................................................... 4
Communi�es and Local Democracy ............................................................................. 14
Climate Change ............................................................................................................ 23
A Sustainable Council ................................................................................................... 30
Our Transforma�on Programme .................................................................................. 32
Audits, Inspec�ons and Accredita�ons ........................................................................ 37
Performance Summary ......................................................................................................... 43
Performance Indicators Adri� of Target ....................................................................... 43
Indicator Amendments and Recommenda�ons .......................................................... 46
Ac�ons Adri� of target ................................................................................................. 46
Performance Indicators ........................................................................................................ 47
Ac�on Tracker ....................................................................................................................... 51
80

Page 81

Our Council Plan Progress Update – Year End 2024 to 2025 Page 1 of 56
Our Performance at a Glance
£21.5 million income
secured for our
residents through
5,842 Money Matters
referrals
Free school meals
extended to eligible
Primary 6 and Primary
7 Pupils
£171,377 of
Participatory
Budgeting Funding
awarded to 190
groups
423,077sq.ft of
commercial/industrial
floor space within our
council portfolio
Our new Digital
Learning Strategy for
our young people was
launched
Our Strategic Housing
Investment Plan
2025-2030 was
approved
90 climate change
and energy lessons
delivered to 29
primary schools to
date
ECO4 Flex Scheme
Funding of £902,809 has
supported 32 North
Ayrshire households to
improve the energy
efficiency of their homes
Our Local Heat and
Energy Efficiency
Strategy procurement
framework was
launched
56.1% of our
household waste is
recycled
Over 4,400 responses
to our 2025-2026
Budget Consultation
81 Skills for Life
Placements created in
2024-2025
81

Page 82

Our Council Plan Progress Update – Year End 2024 to 2025 Page 2 of 56
Welcome
Welcome to our Year-End Progress Report on our Council Plan 2023 to 2028. This report
covers the period 1 October 2024 to 31 March 2025. Our Council Plan is our contract with
our residents and details how we are progressing our four priori�es of Wellbeing,
Communi�es and Local Democracy, Climate Change, and A Sustainable Council:
Our Vision: A North Ayrshire that is fair for all
Our Mission: Working together to improve the
lives of our people in North Ayrshire
Delivery of our Council Plan is progressing posi�vely with 69% of our indicators where the
status is known are either on target or just slightly adri� of target, and 98% of our ac�ons
are on target or just slightly adri� of target. We regularly compare our performance to other
local authori�es with similar demographic traits through the Local Government
Benchmarking Framework (LGBF) and include informa�on on this within our Council Plan
repor�ng. There are 33 LGBF indicators that link closely with our Council Plan priori�es and
of these 33 indicators, 17 are in the top two quar�les. 
We commenced our 2025 to 2026 Budget Consulta�on in October 2024 and received over
4,400 responses from our residents and community groups. Learning from previous
consulta�ons, we adapted and tailored our approach in order to reach more of our
communi�es enabling our residents to comment on the areas which matered most to
them. The increased response rate shows that our approach to consulta�on is improving.
Our Money Maters team received 5,842 referrals in 2024 to 2025 and maximised the
income of our residents by £21.5m. This is in addi�on to Welfare Reform Advice who
received 1,899 referrals for welfare rights and debt advice, resul�ng in £5.7m of financial
82

Page 83

Our Council Plan Progress Update – Year End 2024 to 2025 Page 3 of 56
support being accessed by our tenants. In order to deliver accessible welfare rights and
money advice services for our more vulnerable residents, our Money Maters and Welfare
Reform Advice Team will be rebranded as “Money Smart” and will be accessible via a single
access point. These changes will maximise our resources and capacity to deliver these
services. 
Advancing on the exis�ng provision of Free School Meals for all Primary One to Primary Five
pupils, we are now also offering free school meals to Primary Six and Primary Seven pupils in
receipt of the Sco�sh Child Payment. 
Enabling our residents to par�cipate in local decision making, our 2024 to 2025 Par�cipatory
Budge�ng (PB) round was held both on and offline. This ensured that individuals and groups
who may face barriers to online par�cipa�on could s�ll contribute and have their say. As a
result, 15,882 votes were cast across North Ayrshire.
We have supported 32 households with the installa�on of over 134 energy saving measures
to improve home energy efficiency. This was a part of our ECO4 Flex scheme which looks at
funding for energy efficiency improvements in homes, primarily targe�ng low-income and
vulnerable households. The scheme, part of the wider Energy Company Obliga�on (ECO)
program, offers financial assistance for measures like insula�on, hea�ng upgrades and
renewable energy installa�ons.
To give context to the environment in which we deliver our services, some key measures are
highlighted below:
Together we will ensure a North Ayrshire that is fair for all.
Population of North Ayrshire:
133,570 (2023)
24.3% of our children live in
poverty after housing costs
(2023-24)
28% of our households live in
fuel poverty (2021-22)
65.2% of working age
population is in employment
(June 2024)
10.4% of people earn less than
the living wage (2023)
Area wide CO2 emissions are
682kt CO2 (July 2023)
83

Page 84

Our Council Plan Progress Update – Year End 2024 to 2025 Page 4 of 56
Wellbeing
To transi�on to a wellbeing
economy, delivering prosperity,
wellbeing and resilience for local
people.
Key Ac�vi�es
Child Poverty
A North Ayrshire that is fair for all requires
every child to have the same
opportuni�es in life. Recent sta�s�cs
published by the End Child Poverty
Coali�on showed that child poverty within
North Ayrshire decreased from 29.2% in
2022-23 to 24.3% in 2023-24. This
reduc�on of 4.9 percentage points was
the largest in Scotland over this �me
period.  Many ac�ons within our Council
Plan help address child poverty including
mi�ga�ng barriers to employment as well
as ensuring families are aware of, and can
access, the support they are en�tled to. At
a na�onal level, the introduc�on of the
Sco�sh Child Payment is thought to have
had a posi�ve impact on our most
vulnerable families. 
However, no child should be living in
poverty, and we s�ll have a lot of work
ahead of us. As part of the Fairer Futures
Partnership (FFP) with the Sco�sh
Government, our new Child Poverty
Strategy Team (CPST) was established in
January 2025. A key part of the CPST
ac�vity will be undertaking a co-designed
place-based test of change. In
prepara�on, the team has appointed the
Centre of Excellence for Children’s Care
and Protec�on (CELCIS) as a learning
partner. Our Third Sector Interface
partners are suppor�ng this work and
£45,000 has been allocated to The
Ayrshire Community Trust. This will enable
third sector organisa�ons to be funded as
co-design partners and support the
involvement of residents with lived
experience.
Health Equity
Across the UK, there are marked regional
differences in life expectancy, par�cularly
among people living in areas of high
depriva�on. Following a compe��ve
applica�on process, we have been
84

Page 85

Our Council Plan Progress Update – Year End 2024 to 2025 Page 5 of 56
selected as one of three areas to engage
in the Collabora�on for Health Equity in
Scotland (CHES) programme. Over the
next two years, we will work in
partnership with Public Health Scotland
and the Ins�tute for Health Equity – led by
Professor Sir Michael Marmot - to reduce
health inequity in North Ayrshire through
improving the condi�ons people live and
work in. The programme was officially
launched in February 2025 with over 70
delegates from our partners. A local
steering group has been established to
support iden�fica�on of local priori�es,
which will be informed by local data and
community engagement. The ul�mate
goal is to enable people to live longer,
healthier lives by addressing the root
causes of health inequali�es and prevent
illness before it starts. By crea�ng
condi�ons where communi�es can thrive,
the ini�a�ve aims to create las�ng
posi�ve change.
Money Maters
Welfare advice provides a range of
benefits by helping individuals navigate
complex social security systems and
access the financial support they are
en�tled to. During 2024 to 2025, our
Money Maters team received 5,842
referrals and secured £21.5 million in
financial gains through income
maximisa�on for local residents. These
figures are slightly higher than 2023 to
2024 but are provisional following the use
of a new case management system in
September - the actual totals may be
higher.
In addi�on, our Welfare Reform Advice
team received a total of 1,899 referrals for
welfare rights and debt advice for council
tenants, an increase of 28% compared to
2023 to 2024. The total financial gain for
North Ayrshire tenants was £5.7million, up
from £3.8 million in 2023 to 2024. In
addi�on, the Financial Inclusion Officers:
• Undertook 507 ‘pre-tenancy visits’ for
new tenants and tenancies to ensure
tenants understand changes to their
benefits due to taking on a tenancy,
and their responsibili�es to help them
sustain their tenancy - for example:
priority bills, support with accessing
grants and furnishings for their new
home, and support to claim all their
en�tlements.
• Assisted Universal Credit claims for
2,334 tenants who were also taken
through a support plan ‘matrix’ to
iden�fy and ac�on wider needs.
Our advice services con�nue to be
available throughout our communi�es in
nine priority GP surgeries, schools,
foodbanks and larders and local housing
offices. Macmillan Cancer Research also
provides funding to support advisers to
ensure people living with cancer receive
welfare rights advice and support. Our
Money Maters advisers are also
embedded within Health and Social Care
Partnership services including Children
and Families, Addic�ons and Community
Jus�ce services.
The Welfare Rights Officers in Schools
team now cover Early Years Centres and
primary schools.
Community Wealth Building
Community Wealth Building (CWB) is
about working with communi�es and
businesses to build a strong, fair and
sustainable local economy.
Our Economic Policy
team has supported
the forma�on of the
CWB Prac��oners
85

Page 86

Our Council Plan Progress Update – Year End 2024 to 2025 Page 6 of 56
Network with support from the
Improvement Service. The Network
provides opportuni�es for knowledge-
sharing and collabora�on on common
challenges across local authori�es. It also
seeks to deliver a comprehensive and up-
to-date overview of CWB implementa�on
across Scotland while strengthening
connec�ons between CWB and other
policy areas. 
We have refreshed the Wellbeing
Economy Dashboard – a suite of socio-
economic indicators which are used to
monitor progress towards the delivery of a
Wellbeing Economy in North Ayrshire and
provide context within our Council Plan
Progress Reports.
Employability and Skills
Skills enable people to par�cipate in the
labour market and lead more fulfilling
lives. We con�nued to deliver our broad
‘Your Next Move, Working North Ayrshire’
programme with partners including our
successful Modern Appren�ceship and
Skills for Life programmes. Available to
residents across our six locali�es, the
programme is delivered in partnership
with the Youth Services team who are a
pivotal part of our council’s Community
Learning and Development team,
delivering in excess of 2,000 youth groups
and ac�vi�es across the locali�es of North
Ayrshire. 
We delivered a range of awareness-raising
and recruitment events with partners to
showcase the opportuni�es available
across North Ayrshire. We are also
planning for our next Employability Week
in May 2025.
We created a Disability Employment Hub
at Lochshore Park to provide a range of
training opportuni�es for grounds
maintenance work, allowing trainees to
gain the skills and experience to complete
their hor�culture qualifica�ons, while
improving the public area too.  A
programme of tree plan�ng and
environmental improvements will be
developed with the stakeholders including
Streetscene, Friends of Lochshore and
Conserva�on Volunteers, providing added
value for all involved.  Work to further
progress the Hub will con�nue in 2025 to
2026.
Atainment
The overriding aim of our Educa�on
Service remains to improve the
educa�onal outcomes for all learners,
par�cularly those most disadvantaged
learners. To support this, we are
strengthening the strategic use of data to
drive con�nuous improvement and raise
atainment across our schools. Innova�ve
approaches include analysing Insight
leavers data to iden�fy strengths and
development areas, which will shape
priori�es in the Service Improvement Plan
2025 to 2026. Senior Leaders par�cipated
in a data clinic to enhance their use of
data for improvement and, together with
our Data Service Improvement Group, we
have launched a pilot exploring new
tracking and monitoring tools for literacy
and numeracy. The group is also
evalua�ng these tools to establish
effec�ve metrics for measuring progress
and achievement.
Our Digital Learning Strategy was
launched in March for young people aged
from two years old to 18. The strategy was
created collabora�vely by
our Educa�on Service,
teachers and early
years employees.  It
aims to develop
86

Page 87

Our Council Plan Progress Update – Year End 2024 to 2025 Page 7 of 56
learners’ digital skills in prepara�on for an
increasingly complex world.  It will ensure
our young people are confidently able to
use a range of digital technologies to
deliver exci�ng, suppor�ve, relevant and
engaging learning experiences.
All of our educa�onal establishments will
adopt the strategy from 2025 to 2026
onwards as part of the approach to raising
atainment.
Members of our Educa�on Execu�ve Team
met with the Associa�on of Directors of
Educa�on in Scotland (ADES) Quads group
(Dundee, North Ayrshire, Glasgow City
and North Lanarkshire Council) to iden�fy
areas of common improvement for the
next academic session. Senior Managers
will visit Dundee to gather informa�on
around their improvements in
Achievement of Curriculum for Excellence
Levels for Literacy Primary One, Primary
Four, and Primary Seven in May 2025.
Our Cyber Explorers programme focuses
on enhancing the cyber skills of our young
people aged 11 to 14 years old. The
ini�a�ve is designed to engage young
people with cyber security concepts,
digital skills and poten�al career
opportuni�es in the field of technology.
With educa�on increasingly integra�ng
digital tools, Cyber Explorers presents a
unique opportunity for our young people.
Delivery of the programme began in late
2024 in Greenwood Academy with Second
Year pupils. The programme was delivered
during �metabled compu�ng classes and
was carried out as a group to ensure
everyone could proceed at the same pace.
Some of the comments from par�cipants
included: 
“I will take compu�ng a�er doing this, I
love gaming.” 
“I thought this was really fun, and I
learned a few things from it, coding is my
favourite.”  
Free School Meals
There is strong evidence of the posi�ve
impact that a nutri�ous meal can have on
a pupil’s learning and achievement in
school as well as on their health
outcomes. Free school meals (FSM) also
save North Ayrshire families who take up
the offer almost £400 per eligible child per
year. The latest phase of the expansion of
FSM launched on 24th February. This
phase will encourage families of Primary
Six and Primary Seven pupils in receipt of
the Sco�sh Child Payment to register.
Lifelong Learning Opportuni�es
The Mul�ply project focused on
suppor�ng maths skills and qualifica�ons
in adults. To deliver Mul�ply we worked
with partners including CHAP, TACT,
University of Highlands and Islands,
Ayrshire College and 15 community
organisa�ons. Throughout the year
Mul�ply delivered 521 ac�vi�es including
one to one support, group work,
community based programmes and
support drop-in sessions. 2,339 adults
par�cipated with 505 achieving
qualifica�ons. Referrals over the project
were received from a wide range of
services, including Neighbourhood
Networks Ltd, the Church of Scotland,
Social Services, the NHS, Employability,
Financial Inclusion, Customer Services, the
Department for Work and Pensions
(DWP), Turning Point and HSCP services.  
Working with local third sector
and na�onal organisa�ons
we con�nue to provide
access to learning
opportuni�es. The
adult learning
87

Page 88

Our Council Plan Progress Update – Year End 2024 to 2025 Page 8 of 56
programme supports increased
confidence, progression into further
learning, training or employment, reduced
social isola�on and enhanced community
engagement.
Mental Health & Wellbeing
A key focus for our Community Learning
and Development team has been
suppor�ng schools by delivering our
‘Bounce Back Your Resilience’ youth work
programme. This programme is delivered
by our young people in local primary
schools, is tailored to empower Primary
Six and Seven pupils across North Ayrshire
and helps our Youth Work Modern
Appren�ces to gain experiences in
suppor�ng emo�onal awareness. Upon
comple�on of the six-week programme,
pupils become ‘BeeYou Mental Health
Ambassadors’ for peers in their primary
school. The interac�ve sessions have
raised our children and young people’s
knowledge on:
• What is mental health
• Resilience
• Social Networks
• Friendships and bullying
• Making decisions
• Self-Care
Feedback from pupils has been posi�ve:
“You all helped me realise not to care so
much about what others think.” 
“The youth workers were all amazing
there was nothing I didn’t like.” 
“I have learned to believe in myself and
try to stop doub�ng myself if I fail.” 
Our annual Youth Forum was held at
Ardeer Community Centre on Saturday
22nd February, which brought 50 young
people aged between 12 and 25 years
together to network, share their ideas and
influence local decision making. The day
had a series of workshops including
Money and Mental Health with training
provided by Change Mental Health and
Mental Health UK. Youth groups and
representa�ves in atendance included
North Ayrshire Ac�ve Schools (NAAS)
team, Kilwinning Youth Forum, North
Coast Youth Forum, Garnock Valley Youth
Forum, our council’s Youth Execu�ve (with
pupils from across North Ayrshire
secondary schools), Garnock Valley Youth
Synergy, the Umbrella Club and Members
of Sco�sh Youth Parliament (MSYPs).
Feedback on the day was encouraging
with our young people sharing:
“It was good to develop tools to help us in
the future with managing money and also
overcome the hurdle of speaking about
money openly.”
“I’m excited about my ideas being shared
with people in the council so that I can do
my part to make a difference in other
schools.”
“I feel really good and it felt brilliant to be
actually listened to.” 
Equali�es
Our Ayrshire Shared Bri�sh Sign Language
(BSL) Local Plan 2018 to 2024 Final Report
and Ayrshire Shared BSL Opera�onal Plan
2024 to 2030 was approved by Cabinet in
January 2025. This plan con�nues to align
to the key aims within the Sco�sh
Government strategy and support our BSL
community across East, South and North
Ayrshire.
Care Experienced Young
People
We are commited to
keeping the promise
88

Page 89

Our Council Plan Progress Update – Year End 2024 to 2025 Page 9 of 56
and ensuring all care-experienced children
grow up loved, safe and respected,
enabling them to reach their full poten�al.
In October, our council took part in our
‘Care Experienced Week Celebra�on’. The
purpose of the event was to celebrate the
work of North Ayrshire-wide Corporate
Parents and the achievements of our Care
Experienced young people over the past
year.  We highlighted the development of
the Champions Board and Promise
Champions Network. This Included a
feature on employability support, an
introduc�on from our Promise Delivery
Partner and an on-stage discussion with
Corporate Parents from Mo�va�on,
Commitment and Resilience (MCR)
Pathways, Ac�ve Schools, Educa�onal
Psychology, Dance Therapy and the
English for Speakers of Other Languages
(ESOL) Hub based in Auchenharvie
Academy. 
The event was atended by 61 adults and
young people with engagement from
Corporate Parents and our young people.
Atendees commented on a good balance
of content between our work, North
Ayrshire-wide ac�vi�es and our young
people’s work. 
This event was very important in terms of
our Youth Work and Community Learning
and Development Strategic Plan Priori�es
to:
• Highlight posi�ve des�na�ons that our
young people can and have accessed.
• Share young people’s experiences in a
non-s�gma�sing way.
• Promote and celebrate our young
people’s health, wellbeing, atainment
and achievement.
• Showcase the ways we are reducing
poverty and inequality for our Care
Experienced young people.
• Provide feedback to our young people
about what has happened over the
past year in response to what they
have said they wanted to see improve
or con�nue.
Ayrshire Area Support Team
Our Ayrshire Area Support Team (AST) is
responsible for helping administer the
opera�ons of Children’s Hearings Scotland
(CHS).  In December they welcomed the
Na�onal Convenor of Children’s Hearings
89

Page 90

Our Council Plan Progress Update – Year End 2024 to 2025  Page 10 of 56
Scotland to celebrate the first anniversary
of the new ‘Tribunal Support Model’
which was rolled out across Scotland in
December 2023. At the mee�ng, the AST
was praised for its achievements over the
past year.  This included strong leadership,
sharing best prac�ce and innova�on, and
commending the AST for being a high
achieving region where the Clerking team
has a strong reputa�on across the county
for hard work and support of its
volunteers, par�cularly with their
wellbeing. Partnership working with
colleagues across the Health and Social
care Partnership, Educa�on, Champions
Boards and advocacy providers was also
highlighted.
The North Ayrshire Wellbeing Alliance
As part of The North Ayrshire Wellbeing
Alliance‘s focus on ensuring everyone is
given an opportunity to enjoy life and
cope with challenges, a pilot with the
Local Employability Partnership (LEP) in
Blacklands, Kilwinning, has been designed.
This pilot will look at holding a series of
family fun and drop-in events in April to
bring the community together in an
engaging and informal way via:
• Fun ac�vi�es for all ages with
refreshments.
• Free wellbeing checks.
• Opportuni�es to connect with local
services.
• Informa�on on volunteering, health,
lifestyle, training and employment
support.
Leisure Facili�es
In March 2025, Auchenharvie Leisure
Centre hosted the World Wheelchair
Curling Championships. We worked
closely with colleagues from KA Leisure,
Curling Scotland and other na�onal bodies
to deliver this event at short no�ce. It is
the only Olympic or Paralympic Qualifying
Event which will be held in the United
Kingdom during 2025.
The Duke of Edinburgh atended the event
as Patron of the Bri�sh Paralympic
Associa�on. He also visited the Doon the
Beach project in Stevenston, one of the
many examples of community led ac�vity
within North Ayrshire which offers
employability support and leisure
ac�vi�es as well as a café facility. In
recogni�on of the contribu�on they make
the Duke met with some of the volunteers
to learn more about the projects. 
Housing
Our Strategic Housing Investment Plan
2025 to 2030 was approved in December
2024 and submited to the Sco�sh
Government. The Strategic Housing
Investment Plan (SHIP) is reviewed
annually and sets out the priori�es and
loca�ons for affordable housing
investment by our council and registered
social landlords in North Ayrshire for a
five-year period. The focus of our plan is
to deliver the Sco�sh Government’s
Affordable Housing Supply Programme
(AHSP) to ensure affordable housing in
North Ayrshire. The provision of new build
housing has many benefits, including
helping to regenerate the area, providing
sustainable housing solu�ons which help
address fuel poverty and support
educa�onal atainment. It also assists our
ageing popula�on and people with
addi�onal needs to live more
independently. During 2024 to 2025 we
delivered 71 new homes at the following
loca�ons across North
Ayrshire:
• Former St Mary’s
Primary school
site, Largs.
90

Page 91

Our Council Plan Progress Update – Year End 2024 to 2025 Page 11 of 56
• Former Stanecastle School site, Irvine.
• James McFarlane School site,
Ardrossan.
• Newhouse Drive site, Kilbirnie.
• Laburnum Avenue site, Beith.
• Ayrshire Central Hospital Site, Irvine.
• Garnock Academy site, Kilbirnie.
• Former Kings Arms Hotel, Irvine.
Our Local Housing Strategy 2023 to
2028 annual update was approved at
Cabinet in January 2025. We included a
new ac�on that supports the work
undertaken by the Arran Housing Task
Force established in 2023.  This involves a
wide range of partners to assess the
demand for affordable housing on Arran
and iden�fy issues that may be limi�ng
economic sustainability and growth. A
survey commissioned by the task force is
ongoing to seek opinions on the current
housing provision on the island as well as
future aspira�ons. The survey is open to
homeowners and tenants, landlords,
second homeowners, business owners,
anyone living and working on the island as
well as those considering moving to Arran.
The Sheltered Housing Reprovisioning
Programme con�nues to be implemented.
The next phase planned for refurbishment
includes Laigh Court in Beith and
Vineburgh Court in Irvine.
We con�nue to invest in and maintain our
current housing stock and our estates. We
are proac�vely installing sustainability
measures to ensure they are as thermally
efficient as possible to reduce fuel bills for
tenants. Measures include installing
external wall insula�on and solar
photovoltaic (PV) technology to suitable
proper�es. We are also undertaking a
pathfinder project to explore a 'whole
house' retrofit approach to our exis�ng
homes. This will inform future asset
investment for different property types to
achieve our energy efficiency targets and
reduce fuel costs for our tenants.
Wellbeing Hub
A non-recurring investment of £300,000
was approved by Council in February to
support the explora�on of a new
wellbeing enterprise hub at the former
Greenwood Academy conference centre.
The hub will support the co-loca�on and
development of local third sector
organisa�ons focused on various aspects
of wellness alongside learning
opportuni�es for our young people. A
feasibility study to explore the viability of
a hub and poten�al opera�ng model will
be progressed during 2025.
Great Harbour, Irvine
Our Great Harbour project con�nues with
construc�on on site at Irvine Beach Park.
Our Coastal Hub Play Park is due for
comple�on by the end of September
2025, followed by a new skate park and
pump track and improvements to
connec�ons to the area and around the
Grade B listed Pilot House building. 
When complete, the Coastal Hub area will
provide improved outdoor space and
facili�es for a range of ages and abili�es.
The naming of the play park was discussed
with schools and local groups and an
event has been arranged involving local
schools to announce the chosen name in
June 2025. Design work for Phase 2, the
Mari�me Mile, along Harbour Street, will
commence in June 2025 with stakeholder
engagement taking place as part
of the development work. 
91

Page 92

Our Council Plan Progress Update – Year End 2024 to 2025  Page 12 of 56
Next Steps
• Through our new Child Poverty
Strategy Team – and liaising through
the Community Planning Partnership
(CPP) and CPP Senior Officers’ Group -
we will con�nue to bring a more
systema�c approach to addressing
child poverty in North Ayrshire. This
will include the co-design of place-
based tests of change with partners
from the third sector.
• We will establish our local priori�es
and areas for ac�on as part of the
Collabora�on for Health Equity in
Scotland programme. 
• We will consolidate our financial
inclusion services and rebrand as
“Money Smart”.
• We will explore a debt advice resource
for non-council tenants to enable a
seamless internal pathway to debt
advice. 
• We will roll out the Performing
Engineering Opera�ons (PEO) course
currently available at Ardrossan
Academy to all secondary schools from
August 2025. This course provides
fundamental engineering skills, o�en
for beginners in the field.
• We will review research commissioned
by our council into the poten�al
op�ons for developing CWB
approaches at a locality level including
considera�on of unique island
contexts.
• We will work with anchor ins�tu�ons
to deliver CWB across Ayrshire through
the CWB Commission, Regional
Economic Strategy Delivery Group and
CWB Anchor Charter.
• We will progress the delivery of our
Levelling Up Fund Round 3
Commercial and Low Carbon
Infrastructure project. 
• We will con�nue to provide support
for local enterprise through the
Business Recovery and Sustainability
Fund.
• We will reach Financial Close on the
new Ardrossan Community Campus
and start the construc�on process.
This transforma�onal redevelopment
will bring significant investment to one
of our most deprived communi�es.
• Our Tenant Inspec�on Panel will
scru�nise our Aids and Adapta�ons
provision.
• We will con�nue to deliver new build
housing and regenera�on programmes
to deliver sustainable housing
solu�ons.
• We will progress the review of our
North Ayrshire Housing Register
Alloca�ons Policy.
• We will further develop the Disability
Employment Hub at Lochshore Park.
• We will seek the approval of the Irvine
Neighbourhood Plan by winter 2025.
• We will further consult and engage to
inform the development of the
investment plan in rela�on to the Plan
for Neighbourhoods.
• We will support the delivery of the
Ayrshire Regional Economic Strategy
and Highlands and Islands Economic
Strategy.
• We will work with island stakeholders
to influence the development of the
new Na�onal Islands Plan for Scotland
due for publica�on in late 2025.
• We will review the Arran Task
Force Survey assessing
the demand for
affordable
housing on
Arran.
92

Page 93

Our Council Plan Progress Update – Year End 2024 to 2025 Page 13 of 56
Case Study - Winter Warmer Breakfast
The Winter Warmer Breakfast returned for a third year offering free breakfasts across all
nine secondary schools and Lockhart Campus.
During Winter 2024 to 2025, the free breakfast was available from the beginning of
November 2024 and ran un�l the end of March 2025. 
A range of hot and cold breakfast items were available for all secondary school pupils
designed as a ‘grab and go’ service.  Each year the catering teams have refined the service to
ensure it con�nues to meet the needs of our young people.  The winter of 2024 to 2025 saw
the highest uptake of this service over the three years it has been running, with an average
of 1,200 items being served every school day and a total of over 100,000 breakfast items
being distributed over five months.
A posi�ve unintended consequence of this provision has been an increase in pupils eligible
for free school meals not using their lunch credit at morning break.  They are instead using
their credit at lunch�me to access a full lunch as intended. 
Hidden hunger is an issue in secondary schools as pupils are free to leave the school grounds
at breaks, therefore there is no way of knowing if pupils are accessing food if they are not
atending the school dining facility.  This service helps to address the issue of hidden hunger
even if just in a small way, by offering dignified free food provision at breakfast.
School breakfast provision is intended to address classroom hunger and strengthen
academic performance by improving children’s energy, concentra�on, behaviour and overall
readiness to learn.
93

Page 94

Our Council Plan Progress Update – Year End 2024 to 2025 Page 14 of 56
Communi�es and Local
Democracy
We will have ac�ve, inclusive and
resilient communi�es.
Key Ac�vi�es
Community Learning and Development
Youth Work 
In the final six months of 2024 to 2025
youth work programmes and ini�a�ves
reached 5,164 young people aged under
12 years old and 6,582 young people over
12 years old.
Key areas of focus and achievement
include:
• Early Interven�on and Founda�onal
Skills (Under 12s): Programmes
focused on building founda�onal
social skills, promo�ng healthy
lifestyles, fostering crea�vity, and
encouraging early engagement in
community ac�vi�es.
• Empowerment and Future Pathways
(Over 12s): Ini�a�ves concentrated on
developing leadership skills, enhancing
employability, promo�ng mental and
physical well-being, and facilita�ng
ac�ve par�cipa�on in local decision-
making.
• Community Cohesion and Partnership
Working: We con�nued to strengthen
our partnerships with schools, local
community groups, third-sector
organisa�ons, and other council
services.
Youth work is having a posi�ve impact on
our young people such as:
• Improved Mental Health and
Wellbeing: Through targeted
interven�ons and suppor�ve
environments, we contributed to
improved mental, physical, and
emo�onal well-being with 6,971
par�cipants.
• Equality in Community Connec�ons:
Our programmes fostered a sense of
belonging and encouraged ac�ve
par�cipa�on in community life,
including work with 189 New Scots
young people, targeted work with our
care experienced young people and
the crea�on of our equali�es youth
network.
• Cyber Resilience: This year has seen
the roll out of our Cyber Explorers
work, with our young people achieving
their SCQF Level four and five,
equipping them with cyber skills for
life and future employment, with 704
accounts ac�vated, 139 comple�ng
SCQF Level four and 53 achieving SCQF
Level 5.
Members of the Sco�sh Youth Parliament
Our local Members of the Sco�sh Youth
Parliament (MSYPs) atended the na�onal
si�ng of the Sco�sh Youth Parliament in
October. As part of the Youth Parliament,
they were involved in delivering their
mo�ons in the deba�ng chamber at
Holyrood. There were 15 mo�ons raised
covering a range of issues including an�-
social behaviour, broadband for rural
areas, global climate reputa�on,
protec�ng university funding, cost of living
educa�on, xenophobia and racism,
training for transport
workers, vaping adverts,
Gaelic educa�on,
mental health in
curriculum,
94

Page 95

Our Council Plan Progress Update – Year End 2024 to 2025 Page 15 of 56
femicide, student and appren�ce support,
period products and including Bri�sh Sign
Language in the curriculum. 
Our MSYPs really enjoyed the event. As
well as mee�ng other MSYPs, they had the
opportunity to meet Members of the
Sco�sh Parliament at a parliamentary
recep�on. This meant they could discuss
their roles and the work they are involved
in locally. They felt immensely proud of
their opportunity to sit in the deba�ng
chamber that would normally be filled
with MSP’s and represent not only their
local communi�es but young people from
across Scotland. 
Duke of Edinburgh Awards
Record numbers of our young people
par�cipated in the Duke of Edinburgh
Award scheme in North Ayrshire this year.
The numbers of par�cipants at each level
were: Bronze: 696, Silver: 252, Gold: 58.
An awards ceremony was held at St
Mathews Academy in March to recognise
the achievement of our young people
comple�ng their awards, where 182
received a bronze award, 59 Silver and 11
Gold.
Older People 
Our Community Learning and
Development teams, in partnership with
Locality Workers and residents across
North Ayrshire, hosted an Older People’s
Conference at Saltcoats Town Hall in
February as part of our Older People’s
Voice Par�cipa�on Strategy. The event
welcomed over 60 atendees.
With a focus on ensuring older voices are
heard, respected and acted upon,
especially around issues like local service
delivery and the impact of climate change,
the conference promoted meaningful
dialogue and collabora�on. Atendees
learned about local ini�a�ves addressing
social isola�on and felt more confident
about accessing and par�cipa�ng in these
opportuni�es. New connec�ons were
made across our locali�es. The promo�on
of Discovery Groups, a learning award for
those aged over 50 years, led to increased
registra�ons and a wide range of skills
being shared. One recent newcomer to
the area discovered local ac�vi�es
through the event and has since been
elected secretary for her local community
associa�on. 
New Scots
Our Community Learning and
Development team hosted the first
mee�ng of Afghan women from across
North Ayrshire at the Towerlands
Community Centre. This ini�al mee�ng
was in recogni�on of several new Afghan
families who are geographically diverse
and isolated. All of the women were
invited to an ini�al mee�ng to discuss
whether group ac�vi�es would be helpful
and what they would like to be involved
in. The group has agreed to meet monthly
to con�nue to develop friendships,
networks and reduce isola�on. They also
requested opportuni�es for men and
children to meet and network, so in
partnership with the Health and Social
Care Partnership an Afghan Family fun day
is planned for early April. 
Community Grants and Funding
Par�cipatory Budge�ng (PB) enables
communi�es to have a say in how council
budgets are used. Our 2024 to 2025 small
grants PB saw 15,882 votes cast
across North Ayrshire. To
make sure that as many
residents as possible
were able to have
their say in the
95

Page 96

Our Council Plan Progress Update – Year End 2024 to 2025 Page 16 of 56
process, we not only used our online
Consul pla�orm for vo�ng but also offered
paper-based vo�ng opportuni�es
alongside Consul. This ensured that
individuals and groups who don’t have
digital access or may find using online
tools difficult could s�ll contribute and
have their say. Our young people also took
part in both Youth and Locality PB
processes, using the Consul online
pla�orm to vote and give their views. 
£171,377 was awarded to 190 groups
across North Ayrshire through the small
grants PB process. This funding enabled a
wide range of community-led projects and
ini�a�ves to address local needs. A diverse
range of projects were funded which
focused on youth services, community
wellbeing, environmental improvements,
and support for vulnerable groups. 
8,620 young people contributed to Youth
PB by ac�vely par�cipa�ng in online
vo�ng, deciding on how local money was
spent to enhance or create new projects
for our young people. Our digital approach
to PB, par�cularly around Youth PB, was
included as an example of good prac�ce at
the interna�onal Consul Conference in
February. 
We reviewed how well small grants PB
worked during 2024. This review collected
feedback and recommenda�ons from our
community PB Champions, and our
employees including Modern Appren�ces
who are involved in its delivery. We used
this feedback to create an in-person
session which will help to develop the
approach for the next round of PB.
Community reviewers will also be invited
to provide their feedback and
recommenda�ons on the last cycle.  
Our Community Investment Fund (CIF)
con�nued to support locality-based
projects which contribute to delivering our
priori�es. Locality Partnerships awarded
funding to a range of groups across North
Ayrshire including:
• £41,000 for Beith Hive to support
transport connec�vity for childcare in
the Garnock Valley.
• £49,500 for Irvine Cricket Club to
improve and expand their facili�es to
allow more par�cipa�on in the sport
from local families.
• £25,000 for Corsehill Community
Associa�on to progress with
redevelopment of the local play park.
• £92,685 for Largs Development Trust
to develop a local community hub and
associated ac�vi�es including
community radio.
• £100,000 for Winton Rovers to renew
their stand roof as part of a major
redevelopment package aimed at
improving the facili�es on offer to the
community.
Our Connected Communi�es teams,
together with colleagues from the Third
Sector Interface, con�nue to provide
support and informa�on to local groups
about the funding opportuni�es available
to them. 
Our Communi�es and Place Fund and
Repurposing Property Grant Fund
con�nued to support local community
organisa�ons to deliver a broad range of
projects and develop proposals to bring
vacant and derelict land and property into
posi�ve use. 
96

Page 97

Our Council Plan Progress Update – Year End 2024 to 2025 Page 17 of 56
Community Planning Partnership
Developing our work remains a key
feature in how our Community Planning
Partnership (CPP) func�ons. We have now
embedded our Child Poverty and Cost of
Living programme of work as part of our
main CPP ac�vi�es, in recogni�on of the
need for a partnership approach and the
centrality of the work to our priori�es.
Our focus is on understanding where we
can work together as partners, including
our residents, to use our resources most
effec�vely and improve the lives of our
children, families and communi�es. 
Our ongoing development work with the
Third Sector Chief Officers Group, which
brings together key stakeholders from the
third sector within North Ayrshire, has
been codesigning projects to develop our
strategic understanding and the sector’s
capacity. These projects focus on two
areas which our council has earmarked
funds to support, firstly Child Poverty and
the Cost of Living and secondly,
developing our Community Wealth
Building aims within our communi�es. 
During the year we undertook a review of
our Locality Planning arrangements.
Locality Planning is a way of bringing
together communi�es, council
services and partners to address local
priori�es and reduce inequali�es.
With support from our community
members and partners, we iden�fied
improvements including a more
interac�ve approach to Locality
Partnership mee�ngs, a renewed focus
on our Locality Plans and stronger
leadership to support the Partnerships
in their work.  The recommenda�ons
have been approved by Cabinet and a
programme of work to implement
them is now underway.
Community and Voluntary Sector
The Third Sector Chief Officers Group
con�nues to go from strength to
strength. We are transforming our
partnership with the community and
voluntary sector, recognising the vital
role they play in delivering lifeline
services and support to many
vulnerable people. The
group has co-designed
a programme of
work, including
considera�on of
how we
97

Page 98

Our Council Plan Progress Update – Year End 2024 to 2025 Page 18 of 56
strengthen community wealth building at
a locality level. The group has also
collaborated to develop a number of
innova�ve proposals to be supported
through our council’s Child Poverty and
Early Interven�on Fund.
Community Asset Transfer
Community Asset Transfer (CAT) involves
the transfer of responsibility for an asset
from our council to any suitably qualified
community, voluntary or social enterprise
group. For context, assets may include
public halls and community centres, public
conveniences, parks, sports facili�es and
play areas. In the previous 12 months, our
CAT team has received 17 expressions of
interest - ini�al enquiries that allow us to
ascertain if the asset is available and if the
group is a compliant applicant.  
Earlier this year, our Cabinet agreed to
approve the asset transfer of the Brisbane
Centre to Clyde Coast and Cumbraes
Men’s Shed at the recommended terms of
transfer of 5% of the property valua�on of
£74,000 (totalling £3,700). The Clyde
Coast and Cumbraes Men’s Shed moved
into the Brisbane Centre in October 2022.
Since then, they have been delivering a
valuable service and successfully
opera�ng the facility in the heart of the
local community. Further developments
include: 
• Enhancing the facility to meet the
specific needs of the Men’s Shed -
allowing the club and its members to
expand and grow.
• Increasing membership, thus widening
involvement with the local community
and deepening the impact of their
work.
• Providing stability and a strong base
from which to operate and deliver
events to support the wider
community. 
Plan for Neighbourhoods
Irvine is one of fi�y-five towns benefi�ng
from up to £20 million of investment
through endowment style funding over a
10-year period. The Irvine Neighbourhood
Board is collabora�ng with our council to
develop the objec�ves and projects for
the ini�al four-year neighbourhood plan.
The Plan for Neighbourhoods, previously
known as Long-Term Plan for Towns, seeks
to place communi�es at the heart of the
decision-making process and to provide
the funding to support delivery.
The programme requires a partnership
approach between our council, the
Neighbourhood Board and the
community. A ten-year vision for the town
and more detailed four-year investment
plan must be approved by UK Government
prior to implementa�on by winter 2025.
Further consulta�on and engagement are
planned in 2025 to 2026 to inform the
development of the investment plan.
Tenant Sa�sfac�on 
Overall service sa�sfac�on among North
Ayrshire Council tenants has risen to 92%,
marking an improvement on the previous
result for 2021 of 88.74%. Our three
yearly tenant sa�sfac�on survey ran from
November 2024 to January 2025, with
1,490 responses represen�ng 40% of all
our sampled tenants.  
As part of our ongoing commitment to
consulta�on and improvement, the survey
covered several important
issues rela�ng to our
tenant’s homes, the
service we provide
and their local
neighbourhood.  An
98

Page 99

Our Council Plan Progress Update – Year End 2024 to 2025 Page 19 of 56
ac�on plan is currently being developed to
further improve our service. 
Islands 
North Ayrshire Islands Programme was a
finalist in COSLA’s Excellence Awards in
the category of ‘Strengthening
Communi�es and Local Democracy’, in
recogni�on of the unique partnership
approach taken. We con�nue to work
closely, posi�vely and progressively with
partners to ensure the Island Plan
priori�es are front and centre of local
decision making where possible. 
We have been ac�ve in the development
of the new Highlands and Islands Regional
Economic Strategy, led by Highlands and
Islands Enterprise (HIE) with collabora�on
and input from across the Regional
Economic Partnership membership. 
It outlines the strategic approach to
economic development for the Highlands
and Islands region, including the islands of
Arran and Cumbrae and sets out the
collabora�ve opportuni�es and ac�ons for
the Highlands and Islands Regional
Economic Partnership. This includes a
range of policy areas such as Housing,
Popula�on Atrac�on and Reten�on, Skills,
Childcare, Local Visitor Levy, Community
Wealth Building and Community Benefit.
99

Page 100

Our Council Plan Progress Update – Year End 2024 to 2025 Page 20 of 56
Next Steps
• We will implement the recommenda�ons
of our review of Locality Planning with our
communi�es and partners.
• We will further embed our locality-based
approaches to service delivery and
decision making within our council.
• We will hold dedicated network mee�ngs
and informa�on days for older people as
well as pop up informa�on sessions.
• We will deliver our essen�al skills adult
learning programme with support from UK
Shared Prosperity Funding.
• We will develop a coordinated partnership
approach to recrui�ng, suppor�ng and
recognising our volunteers in North
Ayrshire.
• We will work with the University of the
West of Scotland to promote qualifica�ons
and support upskilling our employees and
volunteers in Community Educa�on.
• We will make progress on the priori�es
iden�fied through the Community Asset
Transfer Start-up Fund review.
• Well will complete our comprehensive
approach to applica�on, assessment
award and compliance in rela�on to
community funds and grants.
• We will con�nue to work with the Third
Sector Chief Officers Group to codesign
solu�ons.
• We will con�nue to develop our new
virtual Community Directory for
community members in crisis.
• We will prepare our CPP Project Plan for
2026 to 2027.
• We will carry out Community and Locality
Planning training sessions for partners and
community representa�ves.
• We will test our streamlined Council Tax
process with our Lived Experience Group
in November.
• We will refresh our Local Island Plans
following the review of Locality
Partnerships and the launch of the new
Na�onal Islands Plan for Scotland.
• We will work in partnership with our
island communi�es to maximise the
opportuni�es from the Sco�sh
Government Islands Programme, Cost of
Living Crisis Emergency Fund (COLCEF) and
Carbon Neutral Islands Capital Fund.
• We will contribute to an inaugural Islands
Economy Showcase at the Sco�sh
Parliament in April.
100

Page 101

Our Council Plan Progress Update – Year End 2024 to 2025 Page 21 of 56
Case Study – Towerlands Graffi� Mural
In response to a recent surge in vandalism at Towerlands Local Community Hub, Irvine, a
unique restora�ve project was created in partnership with the Irvine Locality Partnership
and Locality Team, our Council, Police Scotland and commitee members from Towerlands
Community Centre. 
Five young people were involved in a mural project established as part of the Locality Ac�on
Plan for a targeted group of Greenwood Academy pupils who had played their part in recent
an�-social behaviour. With the help of local graffi� ar�st, Tragic O’Hara, the pupils
par�cipated in six restora�ve youth work sessions at Towerlands Community Centre. 
The aim of the Cyber Explorers mural project is for our young people to create a historic
graffi�-inspired design where they can come together to celebrate the value of their local
community centre and give something back. The group collaborated to map out a design
with key elements celebra�ng community groups such as the kni�ng club, Irvine Pipe Band
and the Dachshund Group who all operate out of the hub.
Engaging with commitee members from Bourtreehill and Broomlands Community
Associa�on (BABCA), the next phase will see the crea�on of a mural to promote the centre
to passers-by. This will depict the history of the community centre, celebrate what the
vibrant community hub offers and how the hub sets its sights on the digital age. 
This work symbolises regenera�on and resilience and offers the young par�cipants an
opportunity to be responsible, crea�ve, collaborate and demonstrate how shared ar�s�c
engagement can help strengthen and rebuild community rela�onships.
Police Constable, Irvine Locality Policing Team:
“Working with our partners and youngsters in the local area, we’ve been
able to emphasise the importance of facili�es like this and try to prevent
criminal ac�vity. We’ve developed an understanding with these teens,
which is helping to improve rela�ons between groups of youths and police
in the area and will benefit the whole community going forward. This
project has also allowed youngsters to channel their energy and learn skills
which they can use for their future”
101

Page 102

Our Council Plan Progress Update – Year End 2024 to 2025 Page 22 of 56
Case Study – Storm Eowyn
When Storm Eowyn swept across Scotland in March, bringing gale force winds of up to
100mph and widespread flooding, North Ayrshire experienced some of the storm’s most
intense effects, triggering an immediate and determined response to protect residents and
keep cri�cal services running.
As weather warnings intensified, Roads crews were mobilised allowing fallen trees and
debris to be cleared quickly and efficiently ensuring emergency access and restoring key
transport links.
To protect residents and staff, we made the early decision to close council buildings for the
dura�on of the storm. Our council priori�sed support for vulnerable individuals, carrying out
welfare checks through our care networks, as well as delivery of food parcels. Temporary
drop in hubs were made available across several of our community facili�es where
prolonged outages were iden�fied. Addi�onally, our Building Services Repairs Team
responded to emergency repairs.
People were kept informed through regular updates on our social media channels and our
customer services helpline was available to provide advice, support and emergency referrals,
handling almost 3,000 calls within the first 72 hours.
There were 917,371 social media impressions (number of �mes people had the opportunity
to view our posts on their social feeds). These included posts shared from other accounts
and pages such as Sco�sh Fire and Rescue, Transport Scotland, Police Scotland and the Met
Office. Addi�onally, we kept our employees informed through our own internal
communica�ons. In the wake of the storm, we launched a review into storm resilience,
focusing on infrastructure investment, flood mi�ga�on and strengthening community
preparedness.
Storm Eowyn tested our resilience but the response from council services, mul�-agency
partners and volunteers demonstrated what is possible when communi�es come together.
102

Page 103

Our Council Plan Progress Update – Year End 2024 to 2025 Page 23 of 56
Climate Change
To achieve net-zero by 2030.
Key Ac�vi�es
Energy
The ECO4 Flex scheme provides funding
for energy efficiency improvements in
homes, primarily targe�ng low–income
and vulnerable households. The scheme,
part of the wider Energy Company
Obliga�on (ECO) program, offers financial
assistance for measures like insula�on,
hea�ng upgrades and renewable energy
installa�ons. Our funding of £902,809 has
supported 32 households with the
installa�on of over 134 energy saving
measures to improve home energy
efficiency.
Our Local Heat and Energy Efficiency
Strategy (LHEES) is a long-term plan,
developed in line with Sco�sh
Government guidance, to address heat
demand, decarbonise hea�ng and
improve energy efficiency in both
domes�c and non-domes�c buildings.
Since it was launched, we have
established our LHEES Working Group and
engaged with other local authori�es and
distribu�on network operators. In March,
we launched our LHEES procurement
framework to undertake feasibility work
to inves�gate heat network zones and
explore our role in localised heat networks
to support low carbon affordable warmth.
Biodiversity
In response to the Global Climate and the
Nature Emergency, the Sco�sh
Government launched its Sco�sh
Biodiversity Strategy to 2045 which states
local authori�es will be responsible for
delivering a Nature Network in their own
area. In response, our Cabinet approved
our North Ayrshire Nature Network
(NANN) strategy in March 2025. The
delivery of this strategy will involve
considerable community buy in,
partnership working and
interdepartmental coopera�on. The
inten�on is to establish:
• An explana�on of what Nature
Networks are and what they will
deliver.
• The na�onal and local policy context.
• A methodology for developing a
Nature Network for North Ayrshire,
following the NatureScot Nature
Network delivery guidance.
• An ac�on plan for the implementa�on
and delivery of the NANN.
49,026 trees have been planted in line
with our 2030 Woodland: A Tree Plan�ng
Strategy through various projects and by
community partners. This remains a key
focus, with support being provided to
local community groups and the
assessment of suitable plan�ng sites and
species for our council's tree plan�ng
con�nuing.  A proposal to plant a further
5,500 trees in the Annick Valley Park has
been well received with plan�ng
scheduled for Autumn 2025. 
Plan�ng of an addi�onal 2,420 mixed
species of trees at Milgarholm in Irvine
has now been completed. A new grounds
maintenance management plan for
Lochshore Park in Kilbirnie is being
implemented. This will include a habitat
management plan which is being created
jointly between our council and the
Friends of Lochshore volunteer group. We
have also assisted in facilita�ng plan�ng of
120 fruit trees by the Friends of
Stevenston Conserva�on
Group, in
Auchenharvie,
Stevenston.  
103

Page 104

Our Council Plan Progress Update – Year End 2024 to 2025 Page 24 of 56
Net Zero Accelerator
The Net Zero Accelerator (NZA)
programme which helps businesses
increase sustainability, reduce their
carbon footprint and work towards
elimina�ng greenhouse gas emissions, has
progressed with a number of projects
being developed to reflect our business
base. As part of phase one, cohorts have
been developed with Net Zero Na�on and
partners. We have also further developed
phase two with an aim to embed and
develop enhanced green adop�on and
skills development for those businesses
seeking to enhance their sustainability
opportuni�es.
Other NZA workstreams developed and
supported include:
• Locally Owned Energy Projects:
Collabora�ve buying consor�um.
• Carbon Assistants Training
Programme:  Upskilling employees to
develop skills in Carbon Accoun�ng.
• Solar Funding Challenges to support
energy cost saving.
• Circular Economy – Suppor�ng waste
reduc�on and new product
development.
The first of its kind islands NZA has been
developed, specifically aimed at the
unique needs and challenges of island
based businesses. 16 small and medium
sized enterprises (SME) enrolled from the
Isles of Arran and Cumbrae. Part funded
by Zero Waste Scotland, collabora�ve
projects are emerging. 
Waste and Recycling
During the 2024 to 2025 financial year, our
bulky waste reuse partner, Cunninghame
Furniture Recycling Company, collected
902 matresses (24 tonnes) and 212
tonnes of household furniture as part of
an ini�a�ve to promote opportuni�es for
their reuse, assis�ng 1,787 households to
furnish their homes whilst also employing
17 staff within North Ayrshire.
As part of a new Circular Economy and
Waste Route Map for Scotland, our
officers are working closely with COSLA,
SOLACE and the Sco�sh Government
through a co-design process, to develop a
revised statutory Code of Prac�ce for
Household Waste Recycling and key policy
ac�ons. The Route Map and the revised
Code of Prac�ce (expected late 2026) will
be key in informing the development of
our council's Zero Waste Strategy to
explore further opportuni�es for
improving reuse and recycling
performance.
In partnership with deep cleaning
specialists and the volunteering network,
a gum removal ini�a�ve was carried out
addressing chewing gum removal and
preven�on. This involved deep cleaning of
our pavements and use of signage to
encourage proper disposal.
The 'Sea Starts Here' campaign with the
Irvine Clean Up Crew to raise awareness of
the impact of marine liter is ongoing. A
key method of raising awareness has been
the use of semi-permanent stencilling on
our pavements, displaying messages such
as, “Please Don’t Liter” and “The Sea
Starts Here”. 
The pilot of our 'LiterLoto' liter
campaign has now concluded and has
proved to be extremely successful since its
introduc�on in April 2024. Data is showing
an increase in those disposing of liter
appropriately. In January 2025, 583 items
of liter were binned responsibly by app
users in North Ayrshire and in February
2025 this number increased to
24,089, increasing
further to 24,742 in
March. 
104

Page 105

Our Council Plan Progress Update – Year End 2024 to 2025 Page 25 of 56
The booking system for our four
Household Waste Recycling Centres
(HWRC’s) was approved by Cabinet in
October. The new system will make visits
smoother and quicker, enabling residents
to book slots at recycling sites at a �me
convenient to them.
In addi�on, the change will enable staff to
assist customers to dispose of their
household waste safely and correctly,
minimising contamina�on and improving
recycling. 
Renewable Energy
Our Council con�nues to support wider
ac�on on climate change out with our
own estate. The Community Renewable
Energy Genera�on Fund (a scheme which
offers funding to community organisa�ons
for renewable energy projects) is
promoted during the Community Climate
Ac�on Plan visits with local communi�es.
Four community renewable projects have
been awarded funding through this fund,
totalling approximately £130,000. 
Addi�onal awareness raising ac�vity is
underway to increase the uptake of the
available funding with support from
Connected Communi�es. The
appointment of a new Energy Awareness
Officer will help to promote and engage
with communi�es further in 2025 to 2026.
Our work con�nues at the Solar PV farm
developments at our former landfill sites
of Nethermains and Shewalton. The
installa�on of these is now complete and
the next phase will see the connec�on to
the electricity network and commissioning
works undertaken.
Decarbonisa�on of the Fleet
A Decarbonisa�on of the Fleet Board has
been established to help progress the
wider roll-out of electric vehicles and the
possibility of other fossil fuel alterna�ves.
We have switched 36 refuse collec�on
vehicles from diesel fuel to Hydrotreated
Vegetable Oil (HVO).  HVO, otherwise
known as ‘renewable diesel’, is produced
from waste cooking oil, animal fat and
forestry materials that are saturated with
hydrogen at a high temperature and
pressure in a process known as
hydrotreatment. 
It can be used in vehicles or equipment
designed for standard diesel, without any
changes to the engine or infrastructure,
and can reduce CO2 emissions by up to
90%. Over a 12-month period, there is
poten�al for our council to save around
2,529 tonnes of carbon emissions. 
Work on the next phase of our Electric
Vehicle Workplace charging network has
progressed to procurement stage. This will
support wider electrifica�on of our
council’s fleet. 
Sustainability
Our Sustainability Team has delivered 90
climate change and energy lessons to 29
primary schools to date. The lessons
support awareness of ac�on on climate
change and encourages ac�on within
schools through their climate ac�on plans.
In partnership with Keep Scotland
Beau�ful, we con�nue to support free
energy resources for Secondary Schools.
Development is also underway on a
community carbon literacy training pack
for small community groups in
conjunc�on with APSE Energy for 2025 to
2026.
As part of our Sustainable North Ayrshire
Strategy, a key priority is the crea�on of
Community Climate Ac�on Plans for each
locality. Building on the
momentum of the
Climate Ac�on Town
Stevenston ini�a�ve,
we have engaged
with local groups by
105

Page 106

Our Council Plan Progress Update – Year End 2024 to 2025 Page 26 of 56
atending community events to explore
poten�al climate ini�a�ves and
understand the barriers they face. The
next phase will see the delivery of three
interac�ve workshops in each locality, co-
designed with community members. 
These sessions will be supported by the
Ayrshire Climate Hub.
In partnership with the Ayrshire Nectar
Network, a project led by the Sco�sh
Wildlife Trust (in partnership with East and
South Ayrshire Councils), we have
supported the establishment of new
wildflower meadows. The ambi�on of this
project is to create pollen rich habitats in
response to the decline of pollinators. We
have provided support to the Friends of
Stevenston Shore and the Friends of
Lochshore.
In partnership with Nature Scotland, we
con�nue our work to implement areas of
naturalised open space to create habitats
for wildlife and encourage bees and
insects through diverse seeding in our wild
meadows. This includes allowing tree
debris to be le� on site (where safe to do
so), to help promote natural habits. We
con�nue to be a key and ac�ve member in
the North Ayrshire Biodiversity
Partnership. A funding applica�on has
been submited for reconstruc�on works
on the banking of Shewalton pond to both
improve access while protec�ng valuable
habitats for flora and fauna.
In November 2024, the third and final
stage of the Fairlie Coastal Path was
completed with the opening of a new,
improved and safer access to the coastline
for residents and visitors to the area (see
case study below). This phase has
completed the link between Bay Street
and the Fairlie Viewpoint path, crea�ng
800m of a con�nuous, traffic free walking,
wheeling and cycling path for people of all
abili�es. 
Travel Smart
Our council’s Travel Smart Behaviour
Change programme con�nues to provide
informa�on and ac�vi�es to the public
and workplaces promo�ng ac�ve travel
and suppor�ng behaviour change.
Through a broad programme of ac�vi�es
aimed to raise awareness and build
confidence, people are encouraged to
walk and cycle more for short journeys.
Short group walks take place across North
Ayrshire enabling par�cipants to increase
their stamina and confidence and develop
a beter knowledge of routes. New and
less confident cyclists receive training to
improve both their on and off-road cycling
skills. Further training is provided for
those wishing to develop their bike
maintenance skills. 
We con�nue to work with Paths for All,
providing walk leader training for people
wan�ng to support exis�ng groups or
develop new walking opportuni�es. We
provide informa�on stalls at libraries,
workplaces and other venues. Since
October 2024 we have delivered over 213
ac�vi�es with over 2,100 people taking
part.
Next Steps
• We will launch our new digital HWRC
booking system.
• We will con�nue to develop
Community Climate Ac�on Plans for
our six locali�es.
• We will con�nue to develop a
Renewable Energy Strategy and
iden�fy projects which may be
suitable for investment.
• We will deliver the North Ayrshire
Network Strategy, aligned
with the Sco�sh
Government’s
Biodiversity
Strategy.
106

Page 107

Our Council Plan Progress Update – Year End 2024 to 2025 Page 27 of 56
• We will con�nue to work with our
partners at South and East Ayrshire
Councils to procure a concession
contract for the delivery of 307 EV
charge points across the area.
• We will install a new permanent self-
led sustainability trail at Eglinton Park.
• We will con�nue to develop projects
for future Ac�ve Travel and
Infrastructure funding opportuni�es.
• We will con�nue to deliver our Travel
Smart behaviour change programme.
107

Page 108

Our Council Plan Progress Update – Year End 2024 to 2025 Page 28 of 56
Case Study – Fairlie Coastal Path
In November 2024, the village of Fairlie
celebrated the official opening of the
Fairlie Coastal Path, an accessible
walkway designed to enhance local
connec�vity, encourage outdoor ac�vity
and boost tourism, represen�ng a
significant step forward in sustainable
local development and community
wellbeing.
Forming part of the wider Ayrshire
Coastal Path, the Fairlie Coastal Path is a
1 km route linking key parts of the village
with the nearby shoreline and natural
reserves ensuring a con�nuous traffic-
free walking, wheeling and cycling path
along the waterfront for people of all
abili�es. Developed in close collabora�on with local residents and marine engineers, the
£633,084 project was funded by the Sco�sh Government and designed and delivered
through a partnership between our council and Sustrans.  The path priori�ses accessibility
and includes viewing points, rest areas and safe access to coastal features.
Community consulta�on was central to this project with local residents contribu�ng ideas
for the path’s layout and features through surveys and planning sessions. The strong sense
of community ownership has been key to the project’s success. 
Since its opening, the path has become a popular des�na�on for walkers, cyclists, families
and nature enthusiasts. It has strengthened connec�ons between people and place, offering
a safe welcoming space for recrea�on, learning and social interac�on. Early feedback
indicates increased local foo�all and interest from visitors, providing poten�al extra foo�all
for nearby businesses.
The Fairlie Coastal Path demonstrates how small-scale infrastructure can have a big impact
when rooted in community collabora�on and respect for the natural environment. It not
only improves access and wellbeing but also preserves the unique character of Fairlie’s
coastal landscape for future genera�ons.
Head of Na�onal Cycle Network at Sustrans Scotland:
“We are delighted to see work finish on this phase of the Fairlie Coastal Path project.  When
we make it easier and safer for people to walk, wheel and cycle, we save lives.
This new route has created a vital traffic-free space, enabling residents and
visitors to travel ac�vely along the waterfront away from busy roads,
while accessing key services and the local coastline.”
108

Page 109

Our Council Plan Progress Update – Year End 2024 to 2025 Page 29 of 56
Case Study – Community Renewable Energy Genera�on Fund
Our council launched the Community Renewable Energy Genera�on Fund (CREGF) in 2023
to support community-led renewable energy projects. CREGF is a compe��ve council fund,
where approved applica�ons are agreed on merit. Funding available for projects is £350k
from our council’s Investment Fund as part of a par�cipatory budge�ng approach to enable
crowdfunding for environmental works. The fund supports our council’s Climate Change
priority, achieving net-zero carbon emissions by 2030. 
The aim of CREGF is to provide one-off funding for projects to increase the level of
community owned renewable energy genera�on opportuni�es and accelerate community
benefits from local renewable energy. To be eligible, applica�ons had to be from cons�tuted
North Ayrshire community groups. Applica�ons from na�onal organisa�ons were also
accepted if their project demonstrated direct benefits to the communi�es of North Ayrshire.
Projects were required, where possible, to include match funding from other non-council
funding sources.
Renewable energy genera�on projects could include solar photovoltaic (PV), wind turbines,
hydropower, heat pumps or green hydrogen. The funding was available for different stages
of projects including feasibility, business case, planning, development or installa�on. It is
expected that any surplus, profit or reduced energy costs delivered by the scheme will be
used en�rely for the benefit of the community group and/or wider community.
So far funding of £128,939 has been awarded to projects within the Garnock Valley, Three
Towns and Arran locali�es. Awards have been granted for the development of a solar PV
farm, wind turbine, air source heat pump and batery storage. Beith Community
Development Trust installed Solar PV on their roof, combined with a batery storage facility
in December 2024. This enabled them to reduce energy use and costs while genera�ng
green renewable electricity. 
CREGF con�nues to be promoted amongst community groups as part of the ongoing work to
develop Community Climate Ac�on Plans (CCAPs). The overall aim of the CCAPs is to lower
the area-wide carbon emissions of North Ayrshire. The CCAPs will contain the climate views
of our communi�es and help to iden�fy climate ac�ons which also support the local
priori�es of each of the six locali�es. These ac�ons can be taken by community groups and
supported by our council. An applica�on to the CREGF can then be made to support the
climate ini�a�ves. 
Our council will con�nue to provide financial assistance by promo�ng the CREGF to support
community-based ac�on. This is a key outcome within the Council Plan Climate Change
priority, where the fund aims to unlock the poten�al of community owned energy
genera�on to bring new income streams into communi�es and help them take direct ac�on
to combat climate change. The Sustainable North Ayrshire Strategy 2024-27
supports the vision of a sustainable, climate ready North Ayrshire where we
all play our part, whether as a local authority, business, school,
community group or individual.
109

Page 110

Our Council Plan Progress Update – Year End 2024 to 2025 Page 30 of 56
A Sustainable Council
To transi�on to a wellbeing economy,
delivering prosperity, wellbeing and
resilience for local people.
Key Ac�vi�es
Modern Appren�ce Employability
Programme
Five of our modern appren�ces completed
their 18-month Youth Work Modern
Appren�ceship accredita�on. They gained
a SCQF7 Youth Work qualifica�on, the
equivalent to an Advanced Higher, a
Higher Na�onal Cer�ficate or the first year
of a degree programme. In addi�on, they
gained accredita�on for First Aid, Mental
Health Resilience, An�-Sectarianism and
Mental Health Awareness. One Modern
Appren�ce stated:
“Since star�ng in 2023, I have gained a
tremendous amount of confidence and
social skills. I am much beter at talking to
new people and engaging in
conversa�ons. Also, I have improved my
�me management, reading, wri�ng, and
decision-making skills. I am so happy I
decided to apply. It has truly been the best
decision I’ve made.”
Skills for Life Programme
In 2024 to 2025, 81 Skills for Life
placements were created in partnership
with the following services and
organisa�ons: Streetscene; Facili�es;
Clerical (various departments); Pupil
Support Assistants; Third Sector; Step Into
Sustainable Business; as well as Care At
Home and Stores through the Health and
Social Care Partnership. 51 of the
placements were across other council
services. 
Accessibility
Our Customer Services, IT and
Transforma�on teams have been ensuring
our public services, both digitally and
locally, are accessible. This includes raising
awareness of our “No Wrong Door”
approach, which aims to ensure residents
are directed to support no mater which
service they ini�ally contact. This has
included employee Drop-In Sessions
across locali�es which were well received.
These are being followed by employee
awareness sessions targeted at front line
colleagues.
The Web Team has been working steadily
to improve the accessibility of our online
content and services, ensuring our
website meets recognised accessibility
standards.
We con�nue to explore how we can, with
our residents’ consent, use the
informa�on we hold to proac�vely offer
them the support they are en�tled to. This
is part of our Single Shared Assessment
model.  Progress is being made within our
Benefits team. Workshops are underway
to review the current customer facing
processes, how we can streamline
applica�ons for benefits and then iden�fy
how these can link to a wider Single
Shared Assessment model. 
Using Data to Inform Decisions
Our tackling poverty dashboard has been
tested, and the data is available for use by
relevant services. U�lising this provides an
understanding of child poverty priority
groups and helps to iden�fy ways to target
unmet need, supported by
the Child Poverty
Strategy and Customer
Service teams. 
110

Page 111

Our Council Plan Progress Update – Year End 2024 to 2025 Page 31 of 56
Agile Workstyle Wellbeing Survey
In December 2024 we hosted an Agile
Workstyle Wellbeing Survey and invited all
1,987 employees who were deemed as
agile workstyle to take part. Key insights
were gathered from the 947 responses
received on how the agile workstyle
impacted on recruitment and reten�on,
work-life balance, benefits to employees,
engagement and collabora�on and the
uptake of wellbeing ini�a�ves. A summary
of the results is below:
Recruitment and Reten�on:  27% of
respondents had joined the Council within
the past four years, with feedback
indica�ng that the agile workstyle
posi�vely influences recruitment and
reten�on.
Engagement and Collabora�on:  89.4% felt
that the amount of �me spent with their
manager (for work/task related issues)
was suitable.  86% felt that the amount of
�me with their manager (to discuss
wellbeing, career growth) was suitable.
80.9% felt that the amount of �me to
collaborate with colleagues in other teams
was suitable.  85.2% felt that the amount
of �me spent on online team mee�ngs
was suitable and 80.3% felt that the
amount of �me spent on in person team
mee�ngs was suitable.
Benefits of agile working:  80% of
respondents felt that agile working
increased the quality of their work and/or
produc�vity. 62% said that agile working
increased their job sa�sfac�on.
79% said that agile working improved
their work life balance with 72% stated
reduced travel �me supported their health
and wellbeing.  66% said agile working
reduced their travel costs.
48% stated that agile working helped
improve their health and wellbeing
rela�ng to caring responsibili�es.
Overall, the survey responses showed that
employees view agile working posi�vely
and would like this to con�nue. They felt
agile working benefits them as individuals,
and teams, improves produc�vity and the
quality of their output.  There is evidence
that agile working has had a posi�ve
impact on recruitment, widening the pool
of candidates who are able to apply for
posts. Most respondents feel agile
working is a factor in retaining them
within our council. This shows workstyle
has a posi�ve impact on atrac�ng and
retaining talent.  An ac�on plan has been
created to support improvements.
Digital Skills Development 
To support the development of a digitally
confident and capable workforce, our
council conducted a Digital Skills Survey in
November 2024. The survey, open to all
employees, received 717 responses and
aimed to provide an evidence-based
understanding of current digital skills and
areas for development.
The findings indicate a high level of
proficiency in core digital tasks, including
device use, communica�on, and
informa�on handling. In response, a
targeted Digital Skills Ac�on Plan has been
developed. This plan will priori�se
improving access to training, increasing
awareness of available resources, and
promo�ng peer support opportuni�es.
The overall aim is to ensure our workforce
can work efficiently, securely,
and confidently in an
increasingly digital
environment.
111

Page 112

Our Council Plan Progress Update – Year End 2024 to 2025 Page 32 of 56
Our Transforma�on Programme
Our current Transforma�on Programme was approved in 2023 and developed alongside our
Council Plan 2023-28. The programme being delivered by our Council has been progressed
around the key priori�es within our Council Plan, driving change and transforma�on, using
technology and innova�on where possible to deliver efficient services to help address the
financial challenges facing our council. Through embedding a culture of con�nuous
improvement, crucially the delivery of our Transforma�on programme can protect the
services we provide to our residents. 
As part of our council’s annual audit arrangements, the focus of the Accounts Commission
this year has been on how councils are responding to the financial challenges through
transforma�on and redesign of services. Audit Scotland recently completed this Best Value
Thema�c Audit for our council. The findings of the audit will be presented to our Audit and
Scru�ny Commitee in May 2025. 
Our Transforma�on programme con�nues to be progressed at scale and pace. This sec�on
provides a summary of progress across our main Transforma�on themes and areas of service
review.
Digital Workstream
Our Transforma�on Board agreed in August 2024 to create a new Digital workstream,
incorpora�ng the principles and aims of the Accessing Our Council programme, to progress
our council’s digital journey. In such a fast-paced landscape the new workstream will capture
progress on digital ini�a�ves across our council, ensuring they are aligned to our Digital
Strategy, as well as tes�ng new areas of innova�on, including Ar�ficial Intelligence (AI), and
ensuring North Ayrshire supports na�onal ini�a�ves through the Sco�sh Government,
Digital Office, Improvement Service (IS) and SOLACE. To date the following progress has been
made:
• A na�onal planner of digital ac�vi�es and projects has been shared with the Digital
Working Group to ensure appropriate updates and representa�on.
• Mee�ngs have been held with the Improvement Service and Digital Office to explore
opportuni�es to be involved in the IS and SOLACE Transforma�on Programme and Digital
Office Na�onal Digital Strategy Refresh.
• At the March 2025 Transforma�on Board, a pipeline of projects was agreed, these include
AI Policy and inves�ga�on of products (Magic Notes, M365 CoPilot proof of concept),
na�onal opportuni�es such as Parents Portal, which is being taken forward by Educa�on
and Digital Economy and how best to u�lise the investment in Digital Infrastructure and
Connec�vity being led by Economic Development, Growth and Regenera�on.
• A Purchase to Pay service review is underway which will review the end-to-
end procurement process across our council, consider the op�mal
process for delivery and further progress supplier e-invoicing.
112

Page 113

Our Council Plan Progress Update – Year End 2024 to 2025 Page 33 of 56
Following the launch of our new council website, more customers are shi�ing towards digital
as their channel of choice to access our services. We recognise that our digital services are
key to suppor�ng this change in behaviour and embedding digital opportuni�es across our
organisa�on, whilst also recognising residents will con�nue to be supported through more
tradi�onal access routes. The newly established Digital Workstream repor�ng into the
Transforma�on Board and Digital Working Group will drive our digital journey.
Irvine Locality Property Review
The Irvine Locality Property Review con�nues to be progressed as part of the Land and
Property workstream. The main purpose of the review is to align our opera�onal property
estate to complement modern ways of working, leading to a carefully managed
ra�onalisa�on of our property estate and to support Community Wealth Building ambi�ons
through greater community use of council owned property. This programme aligns closely to
our strategic priori�es. The focus of the first phase of the property review has been Irvine
which has our most significant concentra�on of property assets, taking a whole locality
approach.
Extensive feasibility work, alongside several service engagement sessions with key
stakeholders, was completed to develop the property ra�onalisa�on concept, generate
op�ons and assess costs, benefits and risks. The informa�on gathered from this work led to
the iden�fica�on of a set of recommenda�ons for our property estate within Irvine for
implementa�on on a phased basis and was approved by Cabinet in March 2024:
• Vacate and subsequently market property assets including Quarry Road, Trinity Church
and Galt House to consolidate opera�ons within, and op�mise u�lisa�on of,
Cunninghame House.
• Vacate Bridgegate House and consider future uses as part of the Irvine town centre
regenera�on work and establishment of the Irvine Town Board, aligned to the Irvine
Town Board Plan for Neighbourhoods.
Work completed to date includes:
• Reloca�on of Genealogy from Irvine Townhouse to Irvine Library resul�ng in increased
foo�all.
• A contract awarded for the Training Suite and Customer Services Centre at
Cunninghame House, Irvine with a start date of June 2025.
• A procurement exercise is underway for construc�on changes at Quarry Road.
• 255 employees relocated to Cunninghame House.
• Reloca�on of the Eglington Trophy to the Heritage Centre.
• Approval of a £300,000 investment in a Community Wealth Building Ini�a�ve to support
the explora�on of a wellbeing enterprise hub at the current Greenwood
Conference Centre site.
113

Page 114

Our Council Plan Progress Update – Year End 2024 to 2025 Page 34 of 56
The employee moves from buildings noted above are expected to be complete by May 2026
with ra�onalisa�on providing the following benefits:
• Op�misa�on of under-u�lised property assets.
• Reduc�on of carbon emissions by an es�mated 286tCO2e.
• Reduc�on of property running costs and property maintenance costs, with combined
es�mated poten�al revenue savings of up to £0.357m per annum.
• Genera�on of poten�al capital receipts or revenue income through leasing
arrangements following marke�ng of the surplus buildings.
Nethermains and Shewalton Solar PV Farm
Construc�on work is complete on the two new solar PV farms at the former Nethermains
landfill site in Kilwinning and the former Shewalton landfill site in Irvine. The new solar farms
will make a major contribu�on to renewable energy genera�on and carbon reduc�on, as
well as bringing sterile land back into produc�ve use, whilst also providing funding for
community ini�a�ves through the renewable energy community benefits scheme. 
The projects are scheduled for energisa�on by mid-2025. The programme of works carried
out in the final 6 months of 2024 to 2025 included:
• Comple�on of moun�ng structure at both sites.
• Comple�on of substa�on works at both sites.
• Comple�on of the grid connec�on works by SP Energy Networks (SPEN).
• Compound area and road installa�on at the Nethermains site.
Commercial Property
The Commercial Property workstream’s vision is of a more efficient property por�olio across
three themes.  Progress across each workstream includes: 
1. Maximise occupancy from the current estate por�olio
Income of £886,199 was generated for 2024 to 2025, which was below expecta�ons due to a
number of factors, including the financial resilience of tenants leading to rent arrears and
even business closures. It is also recognised that the progress being made in the Irvine
Locality Review has had a consequen�al impact on the availability of commercial proper�es.
A detailed review including commercial property performance and associated marked
condi�ons is being prepared for the Transforma�on Board and will inform next steps for
2025 to 2026.
The Irvine Property Board agreed works to maintain the marketable value of Galt House for
disposal funded under the Sco�sh Government’s Place Based Investment Programme
(PBIP). Works include external improvements and roof repairs.  The wider poten�al
for the property will be considered in partnership with the Irvine
Neighbourhood Board in developing the Plan for Neighbourhoods
Investment Plan.
114

Page 115

Our Council Plan Progress Update – Year End 2024 to 2025 Page 35 of 56
2. Maximise opportuni�es from Economic Development, Growth and Regenera�on
(EDG&R) and Ayrshire Growth Deal (AGD) investment (exis�ng projects)
The following ac�vi�es have been progressed during this period to maximise the
opportuni�es from investment: 
• Annickbank Pavilion Phase 3 – Following comple�on of the project in March 2024, a
closing date was set for July 2024, with a preferred tenant iden�fied for the ground
floor. A subsequent closing date was set for February 2025 to enable bidders to consider
the service charge implica�ons of par�al occupancy. Discussions are currently ongoing
with the preferred bidder.
• Montgomerie Park Retail Phase 1 – The property was successfully marketed for sale,
with a preferred bidder iden�fied. The sale is subject to condi�ons, with a planning
applica�on submited by the bidder in July 2024.
• Montgomerie Park Sites E to G – Following a successful marke�ng strategy, a preferred
bidder has been iden�fied for all three sites. Heads of Terms are currently being dra�ed,
with the sale subject to condi�ons and considera�on by Cabinet for approval in June
2025.
• i3 Flexible Space, Irvine: The Ayrshire Growth Deal programme has provided modern
commercial industrial property with the comple�on of one 18,180 sq. � (1,689m2) unit
as part of the i3 Flexible Space project in Irvine. The unit is currently being marketed for
occupa�on.
• Portland Rd. Land Sale - Marke�ng of the vacant industrial land, formerly occupied by
NACCO, at Portland Road, Irvine recommenced December 2024, with a closing date set
in April 2025. A review of offers will then be carried out.
3. Develop proposals for new investment and securing Return On Investment (future
projects)
• An award for the Levelling Up for Ayrshire – Commercial and Low Carbon Infrastructure
under the Levelling Up Fund (LUF) Round 3 of £17.4m was secured from the UK
Government.
• Informed by market feedback, the North Ayrshire proposal aims to address market
failure in the delivery of new energy efficient commercial property alongside the
provision of associated low carbon infrastructure at key employment areas in Irvine. The
Irvine investment concentrates on Kyle Road, Annickbank and i3 sites, the following
progress has been made to date:
− Kyle Rd Phase 2, Irvine: Delivery of 1200m² of new Class 4/5/6 business space
capable of sub-division located at Irvine Industrial Estate, building upon the success
of Kyle Road Phase 1. The proposed design is complimentary to the Phase 1
development. The proposal provides a Gross Internal Area (GIA) of
1137m2 that is subdivided into nine units, eight with an area
between 70m2 and 120m2, and one larger unit on the internal
corner with an area of 265m2.
115

Page 116

Our Council Plan Progress Update – Year End 2024 to 2025 Page 36 of 56
− Annickbank Innova�on Campus, Irvine: Delivery of three 500m² new Class 4/5/6
business spaces located at Annickbank Innova�on Campus, Irvine, to complement
the exis�ng provision.
− i3 Flexible Space Phase 2: Design work is currently being finalised to support a
tender issue in Autumn 2025 for the construc�on of a new industrial building
c.1,700m2.
− Ac�ve travel routes are being designed to improve east/west connec�ons between
the commercial development areas including investment at Heatherhouse Road,
Long Drive, Riverside Way and along the River Irvine at i3 Enterprise Area. The
project will progress to implementa�on in 2025/26, subject to the necessary
permissions and approvals.
Service Reviews
As part of the budget se�ng process, it was agreed that there would be a comprehensive
review of the Waste Service during 2023 to 2025. 
The key elements of the Waste Service
are mainly statutory, however there is an
opportunity within the statutory
provision element to review service
demand, collec�on frequencies and
technology that may help to track and
capture data or provide solu�ons to
current issues.
The Waste Service Review has focused
on several projects across the service. 
During 2024 to 2025 the work detailed
below has been successfully delivered:
• Implementa�on of a Household
Waste Recycling Centre booking system.
• A comprehensive review of opera�onal arrangements and supervisory/management
arrangements, leading to service produc�vity improvements.
• Streamlining of the current Assisted Collec�ons process with recommenda�ons for
improvements.
• Implementa�on of a streamlined three weekly collec�on frequency for Absorbent
Hygiene Products.
• Review and streamlining of the payment process for Commercial Waste customers,
introducing a digital payment process.
Extensive benchmarking and feasibility work with mul�ple other local
authori�es was undertaken as part of this delivery, supported by regular
service engagement and consulta�on mee�ngs with several poten�al
system suppliers. 
116

Page 117

Our Council Plan Progress Update – Year End 2024 to 2025 Page 37 of 56
Audits, Inspec�ons and Accredita�ons 
Best Value Thema�c Approach – Workforce Innova�on
The Best Value Thema�c Audit on Workforce Innova�on was presented to the Audit and
Scru�ny Commitee in August 2024 demonstra�ng how our council is responding to current
workforce challenges through building capacity, increasing produc�vity and innova�on.
The recommended ac�ons arising from the audit including progress updates are below: 
Recommendation Agreed Management
Action
Action
The council should
establish corporate
workforce planning
priorities and develop a
SMART action plan to
allow progress in
delivering these priorities
to be measured.
The Workforce Strategy
will be updated to
include corporate
workforce planning
priorities and an action
plan to allow progress
to be measured.
The Workforce Strategy has been fully updated
to align with internal and external factors,
workforce challenges, Council Plan priorities
and other key strategies and plans. An Action
Plan and Corporate Performance Indicators
have also been included to allow progress to be
measured.  This refreshed Strategy was agreed
at Cabinet on 18th March 2025. 
The council’s workforce
strategy should be
updated to align with all
four Council Plan 2023 to
2028 priorities and with
other key strategies and
plans. It should include an
analysis of council-wide
workforce data and set
out what the required
skills, learning and
development needs of its
staff are.
The Workforce Strategy
will be updated to
ensure alignment to all
Council Plan priorities,
other key strategies and
plans and include an
extract of council-wide
workforce data.
The Workforce Strategy has been fully updated
to align with internal and external factors,
workforce challenges, Council Plan priorities
and other key strategies and plans. The Strategy
has also been updated to include an extract of
council wide workforce data. This refreshed
Strategy was agreed at Cabinet on 18th March
2025. 
The council should build
on the work it has done to
date to demonstrate and
quantify what workforce
benefits and productivity
gains have been made
through its use of digital
technology.
Further work will be
undertaken to capture
and quantify efficiencies
from digital
improvements and for
this work to be
incorporated within our
council’s Medium Term
Financial Planning.
Complementing the Accessing Our Council
workstream the Transformation Board
recently approved the creation of a new
Digital Programme workstream. The intention
is that this will allow digital activities to be
monitored against the Council’s Digital
Strategy. 
To provide some initial evidence of progress,
the Council’s Budget on the 26th February
117

Page 118

Our Council Plan Progress Update – Year End 2024 to 2025 Page 38 of 56
Recommendation Agreed Management
Action
Action
2025 included savings associated with the
Channel shift to digital solutions of £100,000
per year for 2025 to 2026 and 2026 to 2027.
Two posts were identified in 2025 to 2026
(through non-filling of vacant posts), and
further posts will be identified for 2026 to
2027 as part of the Council’s Purchase to Pay
project which aims to centralise the accounts
payable process and further advance e-
invoicing.
Reporting progress through the new digital
workstream provides the framework to capture
and monitor the workforce benefits.
The council should
consider conducting
another digital skills
survey to inform the
support it provides for
improving the digital skills
and knowledge of its
workforce.
A digital skills survey will
be conducted to inform
future development
interventions.
The Digital Skills survey was conducted during
November and December 2024 and was open
to all North Ayrshire Council employees. 
The survey focused on key themes designed to
assess digital confidence and competence
across a range of everyday and work-related
tasks. 
Completion of this survey has captured a
comprehensive picture of digital skills that are
relevant both in the workplace and in personal
life to inform future development intervention. 
An Action Plan has been created to monitor the
progress of interventions. 
The council should
consider gathering further
feedback from staff on
the impact of agile
working on wellbeing and
productivity.
Further feedback will be
gathered from those
employees who are
deemed an agile
workstyle to gauge
continued benefits on
wellbeing and
productivity.
The Agile Working wellbeing survey was
conducted during December 2024 and was
open to all council employees deemed as an
agile workstyle. 
The survey focused on key themes designed to
assess how people viewed agile working, their
productivity, work-life balance and wellbeing. 
An Action Plan has been developed in line with
key themes arising from the results. Chief
Officers have also received specific results in
relation to their directorate and service to allow
any local action to be considered and
progressed. 
118

Page 119

Our Council Plan Progress Update – Year End 2024 to 2025 Page 39 of 56
Recommendation Agreed Management
Action
Action
The council should
explore further where it
can work together with
partners to share services
and increase
collaboration.
The Medium-Term
Financial Planning
process for 2025 to
2026 and 2027 to 2028
will include the
exploration of further
opportunities for
sharing services and
collaboration across
partner organisations.
Collaborative opportunities continue to be
explored with South and East Ayrshire Councils
on options around sharing services on a regional
basis. The work to date has been led by the
three Ayrshire Chief Executives. 
A recent £500,000 bid was submitted to the
Scottish Government Public Sector Reform Fund
to further develop opportunities on a spend to
save basis. 
It is anticipated that, should the bid be
successful, this work will form part of the
SOLACE transformation programme.
In addition to providing
general workforce
planning updates, the
council should regularly
report its progress against
its workforce planning
priorities to Elected
Members through its
Council Plan updates or
other means.
Workforce planning
updates and progress
against priorities will be
regularly reported
through Council Plan
Progress Reports and
other means.
The Action Plan aligned to the Workforce
Strategy has been agreed and set up on
Pentana. Lead officers will provide regular
updates which will be included in the regular
reporting of the Council Plan (these reports).  In
addition, an update will be provided on a
regular basis to the 1st Tier JCC. 
The council should
develop a performance
dashboard to provide a
user-friendly overview of
the impact of its
workforce planning. This
could help to inform
future workforce
planning.
A performance
dashboard will be
developed to monitor
and inform future
workforce planning.
A performance dashboard has been scoped in
line with the Performance Indicators agreed as
part of the Workforce Strategy. This dashboard
is currently in design stage and on track for
completion by the end of September 2025.
Next Steps
• We will con�nue to progress recommenda�ons arising from the Audit Scotland Best
Value Thema�c Work.
• We will con�nue to progress property ra�onalisa�on.
• We will commence prepara�ons for our budget engagement for 2026 to 2027.
• We will carry out full site tes�ng and energisa�on of both of our Solar PV Farms and
progress with an Agreement of Purchase Power Agreement (PPA) for the
sale of energy produced at Nethermains and Shewalton.
119

Page 120

Our Council Plan Progress Update – Year End 2024 to 2025 Page 40 of 56
Case Study – Budget Consulta�on 2025 to 2026
To inform our budget se�ng process, we launched a comprehensive public consulta�on in
October to help shape the 2025 to 2026 budget. Due to the scale of the projected £15.7
million funding gap, our aim was to ensure transparency and collabora�on with our
communi�es and gain insight from their views.
Using collabora�ve methods, a wide-ranging budget engagement exercise was undertaken.
The aim of our approach was to ensure we gained a high number of informa�ve responses
from across our diverse communi�es in North Ayrshire. This was achieved through online,
paper and supported survey comple�on via telephone (through our Customer Contact
Centre) as well as in person engagement. We used a cross-service joined up approach to
improve on previous consulta�ons, develop the surveys and engage our communi�es.
The consulta�on was publicised through our website, press releases and on social media. Of
the 68 posts on social media, we received 81,891 impressions, 211 reac�ons, 178 comments
and 256 shares. 
The surveys were divided into six themes to improve the quality and range of responses.
• Addi�onal Council Tax Levy on Second Homes (507 responses)
• Community Facili�es and Car Parking (1,850 responses)
• Schools and Related Services for Children and Young People (714 responses)
• Service Delivery (254 responses)
• Taxes and Levies (398 responses)
• Waste Services (738 responses)
Specifically, this was to:
• Minimise survey fa�gue as respondents could select the areas they wanted to respond
to quickly.
• Improve accessibility, as it was easier to support paper and telephone responses through
our frontline services and Customer Contact Centre.
• Ensure a more balanced range of responses across each survey and a higher comple�on
rate. (A single survey may have led to the ini�al ques�ons being answered fully with less
detailed or par�al responses for later ques�ons.)
We consulted with a range of community groups across North Ayrshire, some on mul�ple
occasions and at various loca�ons across our area. We reached as broad a range of
community groups as possible. Most of the community engagement was in person, however
there were opportuni�es for video calling to ensure as many people as possible could
contribute their views.
This resulted in an increased response. Whereas in 2024 we received 200
responses through our Budget Challenge tool for the 2024 to 2025 budget
engagement in addi�on to substan�al engagement with our community
groups, this year we received 4,461 responses in addi�on to
community discussions.
120

Page 121

Our Council Plan Progress Update – Year End 2024 to 2025 Page 41 of 56
(It is important to note that the 4,461 responses do not equate to the same number of
respondents, as more than one survey is likely to have been completed by several
individuals.)
In addi�on, several pe��ons have been considered by the Audit and Scru�ny Commitee and
were referred to Cabinet rela�ng to some of the proposals including:
• Saltcoats and Ardrossan Libraries
• Parking charge enforcement in Kilwinning
• Dreghorn Library
• Beith Library
• Eglinton Park
This informa�on was examined by Officers in order to develop proposals for considera�on
by Elected Members in se�ng the budget. In parallel, as we asked for demographic
informa�on within the surveys, it was used to inform the Equality and Children’s Rights
Impact Assessments (ECRIAs) at each stage to ensure we fully considered the impact of
proposals on our residents and communi�es. The outcome of the engagement was
presented to Elected Members at Council on 12th February ahead of the final budget
decision. On 26th February 2025, Council approved a £459 million budget for 2025 to 2026
which includes measures to support residents and maintain frontline services.
We will con�nue to learn and improve our approaches and would like to thank everyone
who contributed to the budget consulta�on process.
121

Page 122

Our Council Plan Progress Update – Year End 2024 to 2025 Page 42 of 56
Case Study – Skills for Life
Jane* was eager to return to employment.   A single mother, she had been out of work since
2020 and faced significant barriers such as childcare costs and availability as well as a lack of
confidence a�er years away from a working environment.  A conversa�on with her health
visitor led her to the We Work for Families project.
Upon joining the project, Jane completed a detailed Needs Assessment and Ac�on Plan. Her
goals were clear - regain confidence, upskill and find sustainable employment. Our
Employability team enrolled her in confidence-building and job-readiness courses,
supported her with childcare costs and provided “beter off in work” calcula�ons to help her
plan financially.
Through the Skills for Life Clerical Programme with our council she secured a 26-week paid
placement in their Parental Employment Team. With on-the-job experience and a suppor�ve
team, she quickly setled into the role, gaining valuable skills and confidence.
Jane received tailored In-Work Support, including CV building, interview prepara�on and job
applica�on guidance. She applied for mul�ple roles, fine-tuned her interview skills and
con�nued to receive help naviga�ng childcare solu�ons.
Her efforts paid off as she went on to secure a permanent part-�me clerical posi�on with
our council with flexible hours that suit her family’s needs.
"Skills for Life gave me the confidence to get back into the workplace. The In-Work Support
helped me build my CV and perfect my interview responses. I finally feel like I’m building a
stable future for me and my son."
(*Name has been changed)
122

Page 123

Our Council Plan Progress Update – Year End 2024 to 2025 Page 43 of 56
Performance Summary
Performance Indicators Adri� of Target
This sec�on details the performance indicators adri� of target and the ac�on being taken to address
performance. Due to expected data lags, the most recent data may relate to previous �me periods
but may only now be available to report. To avoid duplica�on, only data that has not previously been
reported to our Cabinet through Council Plan progress repor�ng is included in this sec�on. Further
details can be found in the Performance Indicators sec�on within this report.
CP_37 Average total tariff score of pupils living in SIMD 20% most deprived areas (Red)
Actual is 664.3 against a target of 714 for 2023 to 2024 (most recent data available).  The average
total tariff score gained from all qualifica�ons by 2024 school leavers from the 20% most deprived
SIMD data zones has marginally decreased from the previous year.  The endeavour to offer candidates
a wider breadth of learning experiences has included more courses (or units of courses) from a wider
voca�onal range of courses and awards that some�mes are graded at the same SCQF level as
Na�onal Qualifica�ons courses but amass a smaller number of tariff points in the Insight scale.
However, these courses can provide learners with a more suitable set of skills and knowledge to
prepare them for work, training or further educa�on. 
Though this PI records the total tariff score for SIMD Quin�le 1 of S4-6 pupils who le� school in 2023
to 2024, the LGBF has a similar measure based on the cohort of young people who would have
reached the end of S6 in 2023 to 2024, irrespec�ve of their leaving year.  For the same period, 2023
to 2024, the equivalent LGBF measure shows a total tariff score of 685, above both the family group
average of 660 and the Sco�sh average of 658 and leading to our council being ranked 6th in
Scotland. 
CP_06 Average tariff score: All Leavers (Red)
Actual is 840.8 against a target of 908 for 2023 to 2024 (most recent data available).  The average
total tariff score gained from all qualifica�ons by school leavers has marginally decreased from the
previous year but is in line with pre-pandemic as well as recent years’ performance. The 2019 to 2020
On Target,
45, 98%
Slightly Adrift
of Target, 1,
2%
Actions
On Target,
13, 50%
Slightly Adrift of
Target, 5, 19%
Significantly Adrift
of Target, 6, 23%
Data Only, 2,
8%
Performance Indicators
123

Page 124

Our Council Plan Progress Update – Year End 2024 to 2025 Page 44 of 56
and 2020 to 2021 results are not comparable with other academic years, as SQA has employed the
Alterna�ve Cer�fica�on Model (ACM) instead of exam-based evalua�on for awarding qualifica�ons at
SCQF level 5 and above. Advice provided by Sco�sh Government colleagues emphasises direct
comparison to alterna�ve cer�fica�on years should not be made without further evidence and the
impact of these approaches. For all SIMD deciles except SIMD 10 (for which we have a very low
number of learners), we con�nue to outperform na�onal figures. 
Though this PI records the total tariff score of S4-6 pupils who le� school in 2023 to 2024, the LGBF
has a similar measure based on the cohort of young people who would have reached the end of S6 in
2023 to 2024, irrespec�ve of their leaving year.  For the same period, 2023 to 2024, this measure
shows a total tariff score of 845, above the family group average of 829 but below the Sco�sh
average of 917 and ranked 26th in Scotland. 
Closer examina�on of the LGBF highlights the strong influence that depriva�on has on this indicator.
When disaggregated by SIMD quin�le, our council outperforms both the na�onal figures and the
family group for each of SIMD quin�les 1 to 4 and also outperforms the family group for SIMD quin�le
5. Despite this strong performance, we know it is important to maintain our holis�c, cross-service
commitment to our Wellbeing priority in order to reflect this at an absolute level.
CP_38 Average total tariff for care experienced Young People (Red)
Actual is 355 against a target of 465.  The average total tariff score (ATTS) achieved by North Ayrshire
care experienced leavers was lower in 2023 to 2024, at 355 tariff points, than the general trend over
the last five years. A slightly higher propor�on than average of care experienced learners le� before
the end of S6 in 2023 to 2024, which has contributed in part to the lower average total tariff score. 
Schools have analysed the data locally and have a clear narra�ve for individual circumstances. The
service will con�nue to focus on improving this benchmark of achievement for care experienced
learners.  Atainment of care experienced learners is specifically referenced within the Educa�on
Service Plan. Quality Improvement visits and atainment discussions with senior school leaders will
include a focus on the atainment and achievement of this group of learners to ensure consistency of
delivery of interven�ons with a posi�ve impact.
CP_40 Number of new build housing units reaching comple�on (all tenures) (actual not cumula�ve)
(Red)
Actual 371 against a target of 396.  We achieved our target for 2024 to 2025 with regards to new
build social housing and have limited influence over the delivery of new build housing constructed by
private housing developers to meet the total 396 homes target. The 25 new homes unable to be
delivered during 2024 to 2025 were across a number of sites throughout North Ayrshire. We
exceeded our target for bringing empty homes back into use and intend to review this performance
indicator and con�nue to focus on improving performance in the forthcoming year. (This indicator is
linked to ac�on CP_10 detailed below).
CP_30 Total installed capacity of low carbon heat and electricity genera�on across the council's estate
(Red)
Actual is 17,630 against a target of 28,499.  Our council had aimed to have both solar PV farms
energised in December of 2024, however this has not been possible due to extended development
�me required by the Distribu�on Network Operator.  The solar farms have been built and are due to
be commissioned in the summer.  
124

Page 125

Our Council Plan Progress Update – Year End 2024 to 2025 Page 45 of 56
CP_31 % of total household waste that is recycled (calendar year as per SEPA) (LGBF) (Red)
Actual is 52.8% against a target of 56%.  The provisional household waste recycling figure for the
calendar year 2024 is 52.8%, subject to verifica�on by SEPA. This has reduced since 2023 as a result of
the introduc�on of the new SEPA guidance regarding the requirement for Waste Upholstered
Domes�c Sea�ng (WUDS) to only be sent for incinera�on, which has nega�vely affected the amount
of bulky waste that can be recycled (this affects all councils).  In addi�on, more wood is being
deposited at recycling centres suitable only for biomass recovery rather than recycling. 
For context, LGBF benchmarking informa�on for 2023 to 2024 (2023 calendar year) released in June
showed we were ranked third in Scotland.  Though our provisional data shows a reduc�on for 2024 to
2025, as the new SEPA guidance affects all councils we will closely monitor our rela�ve posi�on when
compara�ve data is released over the coming months. 
CP_04 Propor�on of children mee�ng developmental milestones (LGBF) (Amber)
Actual is 77.5% against a target of 79% for 2023/24 (most recent data available).  At the most recent
data release for data for 2023 to 2024, the propor�on of children mee�ng developmental milestones
is 77.50%, slightly below the target of 79%.  We are working to ensure there is more robust data
gathering and analysis within Early Years and are moving towards using CfE levels with inbuilt
milestones.  This will help improve accuracy and consistency of data as well as improved progression
pathways to primary.  Roles and remits for Excellence and Equality Leads (EELs) developed this
academic session will support this work.
The challenges we are experiencing in North Ayrshire are reflected in the LGBF comparisons with
other local authori�es.  We are below the family group average of 79.8% and the Sco�sh Average of
83.3%. As a result we are currently ranked 31 out of the 32 local authori�es for our children mee�ng
developmental milestones. This is an area that we know will need specific focus within wider
principles of preven�on and early interven�on, including through the Collabora�on for Health Equity
in Scotland.
CP_28 Hectares of vacant and derelict land in North Ayrshire (Amber)
Actual is 942ha against a target of 925ha.  The majority of vacant and derelict land sites are within
private ownership, therefore their condi�on or development �mescales to inform if they are added or
removed from the register is out with the control of our council. However, we u�lise the Repurposing
Property Grant Fund to help support landowners and community groups to bring back vacant land
and proper�es to use. Furthermore, in 2024 to 2025, several of the key regenera�on funds which
support the redevelopment of such land, including the Vacant and Derelict Land Investment
Programme, were paused which reduced the poten�al to regenerate sites.  Funding has now been
confirmed and works will commence in 2025 to 2026.
CP_43 Number of council assets under community management (cumula�ve) (Amber)
Actual is 55 against a target of 56.  One Community Asset Transfer was delayed un�l Q1 2025 due to
some minor administra�ve issues within the community group which took longer than expected. We
con�nue to publicise the range of offers available for management and ownership of assets to our
community groups and are currently engaged with around 30 groups at various stages of the CAT
process.
125

Page 126

Our Council Plan Progress Update – Year End 2024 to 2025 Page 46 of 56
CP_29 Overall carbon emissions (tonnes) (Non-domes�c council estate) (Amber) 
Actual is 20,333tCO2e against a target of 19,953tCO2e.  This figure is an es�mate and will be
confirmed at the next data release.  Though slightly adri� of target the overall trend is a steady
decrease in emissions.  
CP_25 % of Council dwellings that meet the Sco�sh Housing Quality Standard (LGBF) (Amber)
Actual is 94% against a target of 97.4%.  The target of 97.4% was a set as part of last year’s ARC
comple�on. This pass rate is based on a combina�on of many different compliance criteria for each
individual property, including EICR (Electrical Installa�on Condi�on Report). When the 97.4%
compliance target was set, it was based on 100% compliance regarding the EICR element; however
with issues accessing proper�es, we were unable to achieve this (the EICR compliance outurn figure
for 2024 to 2025 was 97.71)%) which has resulted in the slightly lower overall SHQS compliance of
94% against the 97.4% target.
Indicator Amendments and Recommendations
CP_44a % of council dwellings that are energy efficient (Formerly known as SHSN05a) 
Originally sourced from the LGBF, due to the Energy Efficiency in Social Housing (EESH) regula�ons
being updated from EESH1 (recorded in LGBF) to poten�ally more stringent EESH2 requirements, the
Improvement Service (who administer the LGBF) has paused data recording of this indicator.  EESH2 is
being established na�onally and to ensure we remain transparent in our performance in this area, it
is recommended we con�nue to monitor EESH1 within a new PI (CP_44a).  This will contain all the
historical informa�on from the original LGBF but present local data, consistent with historical data,
from 2022 to 2023 to avoid gaps in our performance informa�on.  This approach will be reviewed
once the LGBF recommences recording of this area.
Educa�on Performance Targets
The educa�on targets in the above indicators are linked directly to the stretch aims previously agreed
with the Sco�sh Government and show figures that are significantly above the atainment levels
achieved during the Covid period when the Alterna�ve Cer�fica�on Model was deployed. 
It is not recommended to draw comparison between these periods. Therefor while we recognise the
merits of being aspira�onal and are commited to delivering ongoing improvement over �me, we
believe it would be sensible to reconsider the level of these targets to align them more closely to
performance in the post-Covid period. This is something we intend to do through appropriate
engagement and as part of the process of developing the next three-year service plan due in 2026.  
Ac�ons Adri� of target
This sec�on details ac�ons adri� of target and the measures being taken to address performance.
Further details can be found in the Ac�on Tracker sec�on within this document.
CP10 Increase the number of homes in the area through a mix of private and social developments
and bringing empty buildings back into use (Wellbeing Priority). (Amber) 
This ac�on is linked to the indicator “CP_40 Number of new build housing units reaching comple�on
(all tenures) (actual not cumula�ve)” which is currently significantly adri� of target (red) (see above). 
We achieved our target for 2024 to 2025 for new build social housing and we have limited influence
over the delivery of new build housing constructed by private housing developers. The 25 new homes
unable to be delivered during 2024 to 2025 were across a number of sites throughout North Ayrshire.
We exceeded our target for bringing empty homes back into use and intend to focus on improving
performance in the forthcoming year.
126

Page 127

Our Council Plan Progress Update – Year End 2024 to 2025 Page 47 of 56
Performance Indicators
PI Code and Descrip�on
2021-
22
Value
2021-
22
Target
2021-
22
Status
2022-
23
Value
2022-
23
Target
2022-
23
Status
2023-
24
Value
2023-
24
Target
2023-24
Status
2024-25
Value
2024-
25
Target
2024-
25
Status
2025-
26
Target
CP_36 Number of residents par�cipa�ng in
community learning and development
ac�vity including youth work
No
data
No
data
No
data 17,804 23,503 18,700 28,102 19,500 23,500
CP_04 Propor�on of children mee�ng
developmental milestones (LGBF) 78.7% 79.5% 77.50% 79%
Data
Available
May 2026
79% 79%
CP_37 Average total tariff score of pupils
living in SIMD 20% most deprived areas 704.8 670.2 664.3 714
Data
Available
March 2026
720 720
CP_06 Average tariff score: All Leavers 905.6 880 847.2 840.8 908
Data
Available
February
2026
910 910
CP_38 Average total tariff for care
experienced Young People 450.3 411.5 355 465
Data
Available
March 2026
470 470
CP_07 % of school leavers entering posi�ve
des�na�ons (LGBF) 96% 93.5% 96.5% 95.6% 96.4%
Data
Available
February
2026
96.8% 96.8%
PI Status
Significantly Adrift of Target
Slightly Adrift of Target
On Target
Data Not Available
Data Only
127

Page 128

Our Council Plan Progress Update – Year End 2024 to 2025 Page 48 of 56
PI Code and Descrip�on
2021-
22
Value
2021-
22
Target
2021-
22
Status
2022-
23
Value
2022-
23
Target
2022-
23
Status
2023-
24
Value
2023-
24
Target
2023-24
Status
2024-25
Value
2024-
25
Target
2024-
25
Status
2025-
26
Target
CP_39b Number of unemployed people that
have progressed to employment as a result
of par�cipa�on in council funded or
operated employability ac�vi�es
555 427 475
Data
Available
November
2025
475 450
CP_10a % of procurement spend on local
enterprises 22.93% 24% 26.04% 25% 24.48% 26% 26.8% 27% 27%
CP_40 Number of new build housing units
reaching comple�on (all tenures) (actual not
cumula�ve)
No
data
No
data
No
data 562 384 295 371 396 436
CP_41 Number of empty homes brought
back into use (actual) 335 120 378 200 375 300 350
CP_28 Hectares of vacant and derelict land
in North Ayrshire 1,198 1,144 1,130 1,094 951 1,094 942 925 925
CP_27 Street Cleanliness Index - % Clean
(LGBF)1 86.7 94 84.6 90 89.1 87 90.3% 87 89
CP_20 Overall percentage of road network
that should be considered for maintenance
treatment
33.9% 37.5% 34.8% 33.8% 32.5% 34.8%
Data
Available
September
2025
32.5% 32%
CP_42 Provided floor space of
commercial/industrial space within our
council por�olio (sq. �)
No
data
No
data
No
data 400,991 404,897 404,755 423,077 423,077 423,077
1 *Sourced from the Local Environmental Audit and Management System (LEAMS) audit conducted by Keep Scotland Beau�ful.
128

Page 129

Our Council Plan Progress Update – Year End 2024 to 2025 Page 49 of 56
PI Code and Descrip�on
2021-
22
Value
2021-
22
Target
2021-
22
Status
2022-
23
Value
2022-
23
Target
2022-
23
Status
2023-
24
Value
2023-
24
Target
2023-24
Status
2024-25
Value
2024-
25
Target
2024-
25
Status
2025-
26
Target
CP_02 % of council budget directed via
par�cipatory methods 2.32% 1.1% 2.74% 1% 2.05% 1.5% 1.97%. 1.5% 1.5%
CP_43 Number of council assets under
community management (cumula�ve)
No
data
No
data
No
data 49 53 54 55 56 57
CP_30 Total installed capacity of low carbon
heat and electricity genera�on across the
council's estate
11,680 11,000 12,104 11,800 15,992 12,000 17,630 28,499 30,137
CP_29 Overall carbon emissions (tonnes)
(Non-domes�c council estate)2 21,791 21,247 20,896 21,000 20,745 19,500 20,333 19,953 19,824
CP_44a % of council dwellings that are
energy efficient (Formerly known as
SHSN05a) (LGBF)3
97.7 98.2 98.01% 98.1 97.66% 98.5 98.7%
CP_45 Length of new or improved ac�ve
travel routes per annum (Metres)
No
data
No
data
No
data 1,090 3,900 2,000 2,500 2,000 2,000
CP_46 Number of trees planted under the
North Ayrshire 2030 Tree Plan�ng Strategy
No
data
No
data
No
data No data No
data
No
data 36,531 40,000 49,026 47,000 60,000
CP_19 Propor�on of opera�onal buildings
that are suitable for their current use (LGBF) 91.1% 93% 95.1% 93% 95.2% 92.1% 95.4% 93% 93%
2 This 2024-25 value is a provisional figure and will be confirmed in the next data release.
3 LGBF repor�ng has paused on this indicator whilst EESSH2 is established therefore the values from 2022-23 onwards are provisional and sourced locally. 
(See Indicator Amendments and Recommenda�ons above.) 
129

Page 130

Our Council Plan Progress Update – Year End 2024 to 2025 Page 50 of 56
PI Code and Descrip�on
2021-
22
Value
2021-
22
Target
2021-
22
Status
2022-
23
Value
2022-
23
Target
2022-
23
Status
2023-
24
Value
2023-
24
Target
2023-24
Status
2024-25
Value
2024-
25
Target
2024-
25
Status
2025-
26
Target
CP_31 % of total household waste that is
recycled (calendar year as per SEPA) (LGBF)4 56.3% 53.1% 55.3% 56.9% 56.1% 57% 52.8% 56% 53%
CP_25 % of council dwellings that meet the
Sco�sh Housing Quality Standard (LGBF)5 49.3% 99.5% 63.2% 76.9% 72.5% 94% 97.4% 97.57%
CP_47 Gross rent arrears (all tenants) as at
31 March each year as a percentage of rent
due for the repor�ng year (LGBF)6
6.6% 7.1% 5.9% 6.5% 8.03% 7.0%
CP_48 % of income due from council tax
received by the end of the year (LGBF) 93.34% 94.7% 93.6% 94%
Data
Available
September
2025
98% 94%
4 The 2024-25 value is a provisional figure and will be updated in the LGBF data release in October 2025.
5 The 2024-25 value is a provisional figure and will be updated in the LGBF data release in September 2025.
6 The 2024-25 value is a provisional figure and will be updated in the LGBF data release in September 2025.
130

Page 131

Our Council Plan Progress Update – Year End 2024 to 2025 Page 51 of 56
Ac�on Tracker
Action Status
Significantly Adrift of Target
Slightly Adrift of Target
On Target
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP01
Ensuring that wellbeing is at the heart of local life and
opportunities, with a focus on tackling inequalities
(Wellbeing Priority).
- - - - - - - - - - - -
CP02 Developing a Community Wealth Building approach to a
wellbeing economy (Wellbeing Priority). - - - - - - - - - - - -
CP03 Improving educational attainment and achievement and
closing the attainment gap (Wellbeing Priority). - - - - - - - - - - - -
CP04
Improving outcomes for care experienced young people
including implementation of The Promise (Wellbeing
Priority).
- - - - - - - - - - - -
CP05 Developing the Young Workforce and ensuring positive
destinations for school leavers (Wellbeing Priority). - - - - - - - - - - - -
CP06
Providing lifelong learning opportunities for individuals
and organisations, including digital literacy (Wellbeing
Priority).
- - - - - - - - - - - -
CP07 Maximising access to and uptake of benefits,
entitlements and financial advice (Wellbeing Priority). - - - - - - - - - - - -
CP08
Ensuring that supports are available in communities to
alleviate cost-of-living pressures through community
hubs and networks (Wellbeing Priority).
- - - - - - - - - - - -
CP09
Through our housebuilding programme and wider
Housing Investment provide homes for life that meet the
needs of our residents (Wellbeing Priority).
- - - - - - - - - - - -
131

Page 132

Our Council Plan Progress Update – Year End 2024 to 2025 Page 52 of 56
7 Delivery of this ac�on is managed through the Health and Social Care Partnership Strategic Plan
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP10
Increase the number of homes in the area through a mix
of private and social developments and bringing empty
buildings back in to use (Wellbeing Priority).
- - - - - - - - - - - -
CP11
Exploration of models and the development of pilot
schemes to increase access to and use of
public/community transport (Wellbeing Priority).
- - - - - - - - - - - -
CP12
Ensure our places and spaces where we live, work and
visit are well maintained and accessible (Wellbeing
Priority).
- - - - - - - - - - - -
CP13 Developing infrastructure to support business growth
(Wellbeing Priority). - - - - - - - - - - - -
CP14 Support KA Leisure’s leadership of North Ayrshire’s
Health and Wellbeing Alliance (Wellbeing Priority). - - - - - - - - - - - -
CP15
Through the Health and Social Care Partnership Strategic
Plan we will protect and provide care and support for
those in need (Wellbeing Priority).7
- - - - - - - - - - - - - - - - - - -
CP16
Developing strong relationships with communities and
partners based on trust and shared aspirations using
their experiences to inform service provision
(Communities and Local Democracy Priority).
- - - - - - - - - - - -
CP17
Providing support for community organisations in
achieving their goals, including as Community Wealth
Building anchor organisations (Communities and Local
Democracy Priority).
- - - - - - - - - - - -
132

Page 133

Our Council Plan Progress Update – Year End 2024 to 2025       Page 53 of 56  
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28  
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP18
Creating a participation and engagement framework
which ensures opportunities and support for all residents
to take part in influencing local democracy and council
and partner strategies (Communities and Local
Democracy Priority).       
- - - - - - - - - - - -
CP19 Supporting participatory budgeting (Communities and
Local Democracy Priority).        - - - - - - - - - - - -
CP20
Supporting community asset transfer and community
owned and operated/managed assets (Communities and
Local Democracy Priority).       
- - - - - - - - - - - -
CP21
Supporting the Community Planning Partnership and the
Community Plan (LOIP) (Communities and Local
Democracy Priority).       
- - - - - - - - - - - -
CP22 Developing partnerships with the third and voluntary
sector (Communities and Local Democracy Priority).        - - - - - - - - - - - -
CP23
Placemaking, including creation of locality action plans
based on the Community Plan (LOIP) priorities and
support the delivery of Islands Plans (Communities and
Local Democracy Priority).       
- - - - - - - - - - - -
CP24
Ensuring an inclusive, fair, rights-based and asset-based
approach in our work (Communities and Local Democracy
Priority).       
- - - - - - - - - - - -
CP25
Accessible public services, both digitally and locally,
ensuring a ‘No Wrong Door’ approach (Communities and
Local Democracy Priority).       
- - - - - - - - - - - -
CP26 Embedding our net-zero ambition in all democratic
decision-making (Climate Change Priority).        - - - - - - - - - - - -
133

Page 134

Our Council Plan Progress Update – Year End 2024 to 2025 Page 54 of 56
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP27
Reducing the carbon footprint of our estate through
rationalisation utilising a locality-based approach and
taking a fabric first and low carbon energy generation
approach to homes and buildings (Climate Change
Priority).
- - - - - - - - - - - -
CP28
Improving resilience and reducing carbon by developing
and supporting supply chains where materials and goods
are sourced locally (Climate Change Priority).
- - - - - - - - - - - -
CP29
Promoting new woodland creation and protecting our
green spaces to provide a natural resource for carbon
sequestration (Climate Change Priority).
- - - - - - - - - - - -
CP30 Supporting local businesses as they meet their climate
change obligations (Climate Change Priority). - - - - - - - - - - - -
CP31
Promoting a circular economy in North Ayrshire to
reduce consumption of raw materials and promote
reuse, repair and recycling, and generating energy from
residual waste (Climate Change Priority).
- - - - - - - - - - - -
CP32 Developing local low carbon energy generation schemes
and networks (Climate Change Priority). - - - - - - - - - - - -
CP33
Unlocking the potential of community owned energy
generation to bring new income streams into
communities and help them take direct action to combat
climate change (Climate Change Priority).
- - - - - - - - - - - -
CP34
Learning for sustainability, and work with communities to
adopt low carbon behaviour change and encourage
climate-based volunteering activities (Climate Change
Priority).
- - - - - - - - - - - -
134

Page 135

Our Council Plan Progress Update – Year End 2024 to 2025       Page 55 of 56  
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28  
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP35
Improving communities’ preparedness to deal with the
impacts of climate change already locked-in (Climate
Change Priority).       
- - - - - - - - - - - -
CP36
Working with communities to adopt low carbon
behaviour change and encourage climate-based
volunteering activities (Climate Change Priority).       
- - - - - - - - - - - -
CP37 Taking a nature-based approach to protect our habitats
and species (Climate Change Priority).        - - - - - - - - - - - -
CP38 Developing and promoting active travel infrastructure
(Climate Change Priority).        - - - - - - - - - - - -
CP39 Transitioning to low and zero carbon travel (Climate
Change Priority).        - - - - - - - - - - - -
CP40
Ensuring robust governance arrangements are in place to
fulfil the council’s statutory duties, manage risk and
support delivery of key priorities (A Sustainable Council
Priority).       
- - - - - - - - - - - -
CP41 Using dynamic data and lived experiences to inform
decision-making (A Sustainable Council Priority).        - - - - - - - - - - - -
CP42
Working with partners nationally, regionally and locally
to secure investment and target resources towards our
priorities (A Sustainable Council Priority).       
- - - - - - - - - - - -
CP43
Driving change and transformation, using technology
where appropriate, to deliver efficient and effective
services and support delivery of priorities (A Sustainable
Council Priority).       
- - - - - - - - - - - -
135

Page 136

Our Council Plan Progress Update – Year End 2024 to 2025 Page 56 of 56
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP44 Maximising financial flexibilities to help support delivery
of priorities (A Sustainable Council Priority). - - - - - - - - - - - -
CP45 Maximising value from the use of our assets (A
Sustainable Council Priority). - - - - - - - - - - - -
CP46 Focusing our investment on priorities (A Sustainable
Council Priority). - - - - - - - - - - - -
CP47
Effective workforce planning ensuring that we have the
right skills/resources to deliver priorities (A Sustainable
Council Priority).
- - - - - - - - - - - -
136

Page 137

Our Council Plan Progress Update – Year End 2024 to 2025
Page 57 of 56
For further informa�on on this report please contact:
Corporate Policy and Performance
North Ayrshire Council
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Tel:  01294 310000
137

Page 138

North Ayrshire Council
Annual Performance
Report 2024 to 2025
Appendix 3
138

Page 139

Welcome to our Annual Performance
Report 2024 to 2025
This Annual Performance Report is the second annual report relating to Our Council Plan.  Our
Council Plan 2023-28 was approved by Council in June 2023 following consultation with our
residents.  It is our joint plan, our contract with our communities, Our Council Plan.  
This report provides an at a glance summary of how we’ve supported our residents of North
Ayrshire during 2024 to 2025. You can find full details in our magazine style Council Plan Progress
Reports published on our website (Council performance (north-ayrshire.gov.uk)).
We are proud to serve our people of North Ayrshire and would like to say thank you to everyone
who has supported the delivery of our services including our communities, third sector, public and
private partnerships and of course our employees.
Our Vision – A North Ayrshire that is fair for all.
Our Mission – Working together to improve the lives of our people in
North Ayrshire.
Our four Council Plan priorities are interlinked and interdependent.
139

Page 140

2024 to 2025 About us
Elected Members
• 12 Scottish National Party (SNP)
• 11 Labour Group Members (8 Scottish Labour Party and 3 Labour and Co-operative Party)
• 6 Scottish Conservative and Unionist
• 2 Reform UK
• 2 Independent
Employees
• 6,406.64 Full Time Equivalent employees
• 7,578 employees
• 76% female
• 24% male
Key facts
• Population:  133,570
• 64,633 households
• Life Expectancy:
o Female:  79.3 years
o Male:  74.9 years
• 19,208 children and young people
attend our schools and early years centres
(including partner early years centres)
• 24.3% of children in North Ayrshire live in poverty
(after housing costs)
• 70.3% of residents are in employment
• 40.9% of our residents live in the most deprived Scottish Index
of Multiple Deprivation areas
Key assets include:
• North Ayrshire is 886 sq.km (mainland is 441 sq.km and our islands are
445sq.km)
• 225km coastline with 16 beaches (including three Sites of Special Scientific Interest (SSSI)
• 44 Local Authority Early Years Provisions
• 15 Partner Early Years Provisions
• 49 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School
• 1 Through School (Early Learning Centre, Primary and Secondary School combined)
• 13,315 council homes
• 1,118 km carriageway
• 3,900mm footpaths
• Approximately 23,750 streetlights
• Over 275 Hectares of woodland
• 15,992kW installed capacity of low carbon heat and
electricity generation across our council’s estate
140

Page 141

Financial Overview
Chief Executive's ,
£20.782, 5%
Education,
£170.791 , 39%
Communities &
Housing, £11.865 ,
2%
Place, £57.815, 13% Health and Social
Care Partnership,
£135.243, 31%
Other Corporate
Items, £9.573, 2%
Financing Costs,
£34.445, 8%
Allocation (£000's)
Scottish
Government
General Grant,
£326.331, 74%
Scottish
Government
Specific Grant,
£6.664, 2%
Non Domestic
Rates, £41.38,
9%
Council Tax,
£66.139, 15%
Funding (£000's)
141

Page 142

Our Performance
This section highlights key areas we have delivered under each of the four priorities: ‘Wellbeing’,
‘Communities and Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’.  Full details can
be found in our six monthly Council Plan Progress Reports on our website Council performance
(north-ayrshire.gov.uk)
Wellbeing
• Recent statistics published by the End Child Poverty Coalition showed
that child poverty within North Ayrshire decreased from 29.2% in
2022-23 to 24.3% in 2023-24. This reduction of 4.9 percentage
points was the largest in Scotland over this time period.
• We have been selected as one of three places to engage in the
Collaboration for Health Equity in Scotland (CHES) programme.
Over the next two years, we will work in partnership with Public
Health Scotland and the Institute for Health Equity to reduce
health inequity in North Ayrshire through improving the
conditions people live and work in. The ultimate aim is to enable
people to live longer, healthier lives by addressing the root causes of
health inequalities and preventing illness before it starts.
• During 2024 to 2025, our Money Matters team received 5,842 referrals
and secured £21.5 million in financial gains through income maximisation for
service users.
• Our council was successful in becoming one of Scotland’s Fairer Future Partnerships (FFP).  This
£350,000 investment enabled our new Child Poverty Strategy Team to be established in
January. It will enhance a systematic approach to addressing child poverty in North Ayrshire.
• We have implemented our Strategic Housing Investment Plan 2024 to 2029, including starting
on-site at Ayrshire Central Hospital in Irvine and at the former Garnock Academy site in
Kilbirnie and completion of sheltered housing refurbishment projects at Cheviot Court, Irvine
and Barnett Court, Saltcoats.
• Montgomerie Park Primary School, Moorpark Primary School and Marress Early Years Centre
all opened in the second half of 2024. Montgomerie Park Primary is the first Passivhaus school
in the region, which means the school has been built to a standard which provides a high level
of comfort for pupils and employees while using very little energy for heating and cooling.
• Almost £2.1 million in external funding has been secured to advance the Local Transport and
Active Travel Strategy.
• We commissioned a study into opportunities for Community Transport, specifically examining
the existing public transport provision on Arran and in the Garnock Valley.
• A key focus for our Community Learning and Development Team has been supporting schools
by delivering our ‘Bounce Back Your Resilience’ youth work programme. This programme is
delivered by young people in local primary schools and is tailored to empower Primary Six and
Seven pupils across North Ayrshire.  Our young people said:
“You all helped me realise not to care so much about what others think.”
“The youth workers were all amazing there was nothing I didn’t like.”
“I have learned to believe in myself and try to stop doubting myself if I fail.”
• During 2024 to 2025 we delivered 71 new homes across North Ayrshire.
142

Page 143

Communities and Local Democracy
• We completed a review of our locality planning framework, agreeing a number of
recommendations informed by feedback from participants, which will further strengthen local
democracy
• We published our new Participation Strategy which will focus on raising awareness of
participation processes including locality partnerships and enhance our budget consultation.
• Our Community Investment Fund continued to support our priorities through community
groups.  This included £41,000 for Beith Hive to support transport connectivity for childcare in
the Garnock Valley.
• Our Community Asset Transfer Team has received 17 expressions of interest during 2024 to
2025, with 56 council assets under community management to date. We have expanded our
capacity to support Community Asset Transfers (CATs) through engaging with our Active
Schools team.
• A number of activities were delivered for our care experienced young people through our
Corporate Parenting Summer Programme, as well as Active Schools and Community
Partnership Officers working closely with our Health and Social Care Partnership. 638 of our
young people took part, with 71% supported into longer term extra-curricular activity. Over
65% of attendees felt safer, that they were achieving more and/or felt more respected.
• Our council services delivered a coordinated approach to protect our residents and keep
critical services running during Storm Eowyn.
• Our Financial Inclusion Partnership is developing a communications plan to help promote
services to island residents, our gypsy traveller community, those who are digitally excluded
and residents with disabilities
• The Multiply project focused on supporting maths skills and qualifications in adults. To deliver
Multiply we worked with partners including CHAP, TACT, University of Highlands and Islands,
Ayrshire College and 15 community organisations. Throughout the year Multiply delivered 521
activities, 2,339 adults participated with 505 achieving qualifications.
• Our 2024 to 2025 small grants participatory budgeting saw 15,882 votes cast across North
Ayrshire, with £171,377 awarded to 190 groups across North Ayrshire
• 8,620 young people contributed to youth participatory budgeting through online voting and
deciding how local money could be sent of projects to benefit our young people.  Our digital
approach was included as an example of good practice at the international Consul Conference
in February.
• Overall service satisfaction among North Ayrshire Council tenants
has risen to 92%, marking an improvement on the previous result
for 2021 of 88.74%. Our three yearly tenant satisfaction survey
ran from November 2024 to January 2025, with 1,490
responses representing 40% of all our sampled tenants.
• Our North Ayrshire Islands Programme was a finalist in
COSLA’s Excellence Awards in the category of
‘Strengthening Communities and Local Democracy’, in
recognition of the unique partnership approach taken.
We continue to work closely, positively and
progressively with partners to ensure the Island Plan
priorities are front and centre of local decision making
where possible.
143

Page 144

Climate Change
• Installation of our council’s two new solar photovoltaic (PV) farms is now complete with the
next phase being the connection to the electricity network and commissioning works. They are
expected to generate £400,000 of revenue per year over 25 years as well as reduce our carbon
footprint whilst also providing funding for community initiatives through the renewable energy
community benefits scheme.
• A £17.4m award from the Levelling Up Fund Round 3 was secured from the UK Government.
This will support Levelling Up for Ayrshire, Commercial and Low Carbon Infrastructure.
• 15 households on Cumbrae and 25 in Kilwinning have been identified for improvements via the
Energy Efficient Scotland: Area Based Scheme. This will help address the impact of energy costs
and address fuel poverty.
• Four community renewable projects have been awarded £130,000 in funding through the
Community Renewable Energy Generation Fund.
• The ECO4 Flex scheme provides funding for energy efficiency improvements in homes,
primarily targeting low income and vulnerable households.  Our funding of £902,809 has
supported 32 households with the installation of over 134 energy saving measures to improve
home energy efficiency.
• 16 small and medium sized enterprises (SMEs) have enrolled for a first of its kind islands Net
Zero Accelerator programme.  This helps businesses increase sustainability, reduce their
carbon footprint and work towards eliminating greenhouse gas emissions.  Part
funded by Zero Waste Scotland, collaborative projects are emerging.
• Over the year our bulky waste reuse partner, Cunninghame Furniture
Recycling Company, collected 902 mattresses (24 tonnes) and 212
tonnes of household furniture as part of an initiative to promote
opportunities for their reuse, assisting 1,787 households to furnish
their homes whilst also employing 17 people within North
Ayrshire.
• We have switched 36 refuse collection vehicles from diesel fuel
to Hydrotreated Vegetable Oil (HVO).
• In November 2024, the third and final stage of the Fairlie
Coastal Path was completed with the opening of a new,
improved and safer access to the coastline for residents and
visitors to the area.
144

Page 145

A Sustainable Council
• Our most recent Best Value Thematic Audit focusing on Workforce Innovation was positive,
showing how our council is responding to current challenges by building capacity, increasing
productivity and innovation.
• Our Transformation Programme continues to progress, with key milestones reached within the
Digital Workstream, Irvine Property Review as well as the Nethermains and Shewalton Solar PV
Farm detailed above.
• The Transformation Board is overseeing service reviews across the Learning Resource; Housing
Service; Financial Inclusion Services; External Residential Placements; Economic Development,
Growth and Regeneration; and Waste Services.
• The Irvine Locality Review is progressing to align our operational property estate to the
changing workstyles of our workforce.  To date we have:
o Relocated Genealogy from Irvine Townhouse to
Irvine Library resulting in increased footfall.
o Relocated 255 colleagues to
Cunninghame House.
o Relocated the Eglington Trophy to
the Heritage Centre.
o Approved a £300,000
investment in a Community
Wealth Building Initiative to
support the exploration of a
wellbeing enterprise hub at
the current Greenwood
Conference Centre site.
• We have generated £886,199 in
income from our commercial property
estate.
• £17.4m was secured from the UK
Government via the Levelling Up Fund.
• In 2024 to 2025, 81 Skills for Life placements
were created in partnership with the following
services and organisations: Streetscene; Facilities;
Clerical in various departments; Pupil Support Assistants;
Third Sector; Step Into Sustainable Business; Care At Home and the Stores through the Health
and Social Care Partnership.  51 of the placements were across other council services.
• We delivered a comprehensive public engagement exercise to inform our budget setting
process for 2025 to 2026.  The revised approach generated increased engagement from our
communities, with 4,461 responses received in addition to community group feedback.
145

Page 146

Next Steps
Next steps for the next six months are included in our six-monthly 
Council Plan Progress Reports on our website www.north-ayrshire.gov.uk.
How do we compare?
You can discover how our
performance compares to
other Scottish local authorities
through the national Local
Government Benchmarking
Framework online tool or
through our LGBF Report
published within our Year End
reporting on our website
www.north-ayrshire.gov.uk. 
146

Page 147

We strive to make our reporting as accessible as possible.  If you
have any questions or require further information on our
council’s performance please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at: Council performance (north-ayrshire.gov.uk)
147

Page 148

148

Page 149

NORTH AYRSHIRE COUNCIL 
23 September 2025 
Audit & Scrutiny Committee 
Title:    External Audit Report on the 2024/25 Audit 
Purpose:  To invite Committee to note the Annual Audit Report for 2024/25
and to consider the verbal report by the external auditor. 
Recommendation:  That Committee: 
(a) Notes the findings of the 2024/25 audit of the financial 
statements as contained in the external auditor’s Annual
Audit Report at Appendix 2; 
(b) Considers the verbal report by the external auditor;
(c) Notes the agreed Action Plans as outlined in Appendix 1 to
the Report; and
(d) Approves the audited Annual Accounts for signature. 
1. Executive Summary 
1.1 As part of the external audit for 2024/25, Audit Scotland have produced the attached
Annual Audit Report which includes an opinion on the Council’s financial statements
and reports on progress in delivering Best Value over the same period. 
1.2  The unaudited accounts for the year to 31 March 2025 were approved by Council on
25 June 2025 and submitted to the Council’s external auditor, Audit Scotland, for
audit. The Audit Director for Audit Scotland has now issued their proposed 
Independent Auditor’s Report on the financial statements which is free from
qualification and confirms that the accounts give a true and fair view of the state of
affairs of the Council, its group and the Council’s charitable trusts as at 31 March
2024. 
1.3 The Annual Audit and Best Value report also provide the Audit and Scrutiny
Committee with the external auditor’s findings in relation to the arrangements for
securing best value and the audit dimensions. 
Agenda Item 4
149

Page 150

1.4  The overall conclusions of the reports state that the Council: 
• The Council continues to demonstrate a strong culture of continuous improvement;
• The Council’s transformation programme planning and programme management
arrangements are clear;
• The Council actively works with partners to identify better ways of delivering its
ambitions;
• The Council systematically measures and reports on its performance across its
strategic priorities
• Financial management is effective;
• The Council has appropriate governance and decision-making arrangements; and 
• The Council’s performance, taken from national benchmarking data, shows an
improving position year on year. 
1.5  As detailed in Section 1 of the Annual Audit Report, a number of adjustments have
been identified during the audit process. However, these adjustments  are in relation
to the valuation of non-current assets and the introduction of revised accounting
requirements in relation to leases and do not impact on the reported balance of
Unearmarked Reserves which remain unchanged at £9.181 million. 
1.6  Audit Scotland’s report includes action plans in relation to the recommendations for
improvement identified during the course of the audit. Full details of these and the
proposed management actions are included in appendix 1 to the report. 
2. Background 
2.1 The 2024/25 audit of the Council’s accounts was conducted by Audit Scotland, the third
of a five-year cycle as the Council’s appointed external auditors. 
2.2  Appendix 1 includes letters of representation to be signed by the Head of Finance as
the responsible officer for North Ayrshire Council. Audit Scotland’s annual report to
members, which summarises the findings of their audit, is attached at Appendix 2. In
addition, this report details Audit Scotland’s conclusions on the Council’s performance
in meeting its Best Value duties and the wider scope areas of: 
• Financial Management; 
• Financial Sustainability;
• Vision, Leadership and Governance; and
• Use of Resources to Improve Outcomes. 
2.3  The Council’s accounts for the year to 31 March 2025 were submitted to Audit
Scotland by the deadline of 30 June 2025. The external auditor is required to report
on certain matters arising to those charged with governance in sufficient time to
enable appropriate action to be taken before the financial statements are approved
and certified. Audit Scotland has issued an unmodified report on the accounts of the
Council and its charitable trusts confirming that they show a true and fair view of the
financial position. 
150

Page 151

2.4  During the audit, Audit Scotland and Council officers identified a number of significant
errors and adjustments relating to the valuation of the Council’s assets and the
introduction of revised accounting arrangements for leased assets, including the
schools constructed under PPP and DBFM arrangements. The total value of these
errors and adjustments was £82.374m. These have been corrected in the Audited
Annual Accounts. 
2.5 In addition, Audit Scotland has identified a historical error in the calculations for the
valuation of Council Dwellings. A review of the methodology has been carried out and
the value of Council Dwellings previously reported during 2023/24 has been adjusted
by £33.673m. 
2.6  The overall level of unusable reserves has not been impacted by any of these
adjustments, and the reported balance of Unearmarked Reserves has remained
unchanged at £9.181 million.
2.7 In relation to the Council’s charitable trusts, Audit Scotland have issued an unqualified
opinion in relation to the charitable trust accounts.
2.8  The report notes that the auditor has received a statutory objection to the accounts
relating to the Common Good and Trust Funds and has met with the objector to
consider the issues and evidence provided. The auditor has concluded that the issues
raised are not material to their opinion.
2.9  As well as auditing the financial statements, Audit Scotland considered the Council’s
arrangements in relation to Best Value and the audit dimensions. A summary of the
key conclusions from the report include:
Best Value
• The Council has continued to demonstrate a strong culture of continuous
improvement;
• The Council’s transformation programme planning and programme management
arrangements are clear;
• The Council systematically measures and reports on its performance across its
strategic priorities; 
• The Council actively works with partners to identify better ways of delivering its
ambitions for North Ayrshire; and
• The Council complies with the requirements of the Statutory Performance
Information Direction.
Financial Management
• Financial management is effective
• The Council reported a service underspend of £17.0 million against its 2024/25
budget and there was a £3.489 million increase in usable reserves;
• There is a planned use of reserves over the medium term to mitigate funding gaps;
• A new General Fund Capital Investment Programme 2024/25 to 2033/34 is used to
inform capital investment and support Council Plan priorities;
• Long-term borrowing levels has increased in support of the council’s capital
programme;
• Financial systems of internal control were effective and internal audit provided a
reasonable level of assurance over the Council’s framework of governance, risk
management and control arrangements.
151

Page 152

Financial Sustainability 
• The Council approved a balanced budget for 2025/26, but only after planning to
utilise £5.0 million of reserves, non-recurring savings of £9.5 million for reduced
pension contributions and further savings of £4.8 million across Directorates;
• Significant risks exist to achieving financial balance in 2024/25.;
• The latest MTFO which covers the three-year period to 2027/28 has identified a
structural funding gap of £46.7 million;
• In 2024/25 the council released 85 staff which delivered approximately £2.5 million
recurring savings. A further 45 staff reductions are anticipated in 2025/26;
• Discussions are also currently ongoing on how efficiencies could be realised
through delivering council services differently in partnership with others. Elected
members will need to make difficult decisions on how the use of resources is
prioritised going forward, within its recurring funding; and
• High absence rates continue to be reported in areas which require cover
arrangements, specifically teachers and waste collection incurring additional costs
of £2.6 million.
Vision, Leadership and Governance
• There is openness and transparency within the council together with appropriate
governance and decision-making arrangements;
• There are appropriate governance and decision-making arrangements in place at
the council; and
• The council offers a training programme for members in addition to e-learning and
the opportunity to attend Improvement Service events and webinars.
Use of Resources to Improve Outcomes
• There has been regular reporting of the council’s progress with its Council Plan
priorities, with good progress made in completing actions for year two of the plan;
• The council’s performance, taken from national benchmarking data, shows an
improving position year-on year, but overall performance relative to other councils
has remained constant; and
• HMIe reported positively on how the council supports schools to improve the quality
of education.
2.10  The recommended actions arising from the audit are detailed in Appendix 1 to the
report, including: 
• A review of capital accounting processes and procedures;
• An impairment review should be conducted whenever there is an indication that an
asset might be impaired; and 
• The Council needs to set out in advance what criteria have to be met for an ‘on
target’ judgement to be made for each action in the Council Plan.
2.11  A link to the final audited accounts will be issued to all members for their information.
2.12  Representatives from Audit Scotland will be in attendance at Committee and will
present a verbal report highlighting the main findings of the 2024/25 report. 
152

Page 153

3. Proposals 
3.1 It is proposed that Committee: 
(a)  Notes the findings of the 2024/25 audit of the financial statements as contained in
the external auditor’s Annual Audit Report at Appendix 2; 
(b) Considers the verbal report by the external auditor;
(c) Notes the agreed Action Plans as outlined in Appendix 1 to the Report; and
(d) Approves the audited Annual Accounts for signature. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. 
Human Resources 
4.2 None. 
Legal 
4.3 Under the Local Authority Accounts (Scotland) Regulations 2014 the Council is required
to approve the audited Annual Accounts for signature by 30 September 2025. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
153

Page 154

5. Consultation 
5.1 The Chief Executive, Executive Directors and other appropriate officers have been
consulted as part of the audit process. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
North Ayrshire Council Unaudited Accounts 2024/25 –Council, 25 June 2025; 
North Ayrshire Council Charitable Trusts: Unaudited Trustees’ Annual Report 2024/25 –
Council, 25 June 2025   
154

Page 155

HEAD OF FINANCE:  Mark Boyd
Cunninghame House, Irvine KA12 8EE
Tel: 01294 310000  
www.north-ayrshire.gov.uk   
Your Ref:  Our Ref:  
If telephoning please ask for:  Mark Boyd  01294 324560 
23 September 2025 
Fiona Mitchell-Knight FCA 
Audit Scotland 
4th Floor, The Athenaeum Building
8 Nelson Mandela Place 
Glasgow 
G2 1BT 
Dear Fiona, 
North Ayrshire Council Annual Accounts 2024/25
This representation letter is provided in connection with your audit of the annual report and
accounts of North Ayrshire Council and its group, for the year ended 31 March 2025 for
the purpose of expressing an opinion as to whether the financial statements give a true
and fair view and have been properly prepared, and for expressing other opinions on the
Remuneration Report, Management Commentary, and Annual Governance Statement.
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your
audit of North Ayrshire Council’s annual accounts for the year ended 31 March 2025.
General
I have fulfilled my responsibilities for the preparation of the 2024/25 annual accounts as
set out in your 2024/25 Annual Audit Plan. All the accounting records, documentation, and
other matters which I am aware are relevant to the preparation of the annual accounts
have been made available to you for the purposes of your audit. All transactions
undertaken by North Ayrshire Council have been recorded in the accounting records and
are properly reflected in the financial statements. 
I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. As you have reported, there are no
uncorrected misstatements. 
Financial Reporting Framework 
The annual accounts have been prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2024/25 (2024/25 Code) and the
requirements of the Local Government (Scotland) Act 1973, the Local Government in
Scotland Act 2003, and the Local Authority Accounts (Scotland) Regulations 2014. 
In accordance with the Local Authority Accounts (Scotland) Regulations 2014, I have
ensured that the financial statements give a true and fair view of the financial position of
North Ayrshire Council and its group at 31 March 2025 and the transactions for 2024/25. 
155

Page 156

Accounting Policies and Estimates 
All material accounting policies applied are as shown in the note included in the financial
statements. The accounting policies are determined by the 2024/25 Code, where
applicable. Where the 2024/25 Code does not specifically apply, I have used judgement in
developing and applying an accounting policy that results in information that is relevant
and reliable. All accounting policies applied are appropriate to North Ayrshire Council’s
circumstances and have been consistently applied. 
The methodology, significant assumptions, and data used in making accounting estimates
are reasonable, and have been properly reflected and disclosed in the financial statements
in accordance with the 2024/25 Code. Judgements made in making estimates have been
based on the latest available and reliable information. Estimates have been revised where
there are changes in the circumstances on which the original estimate was based or as a
result of new information or experience. 
Going Concern Basis of Accounting 
I have assessed North Ayrshire Council’s ability to continue to use the going concern basis
of accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on North Ayrshire Council’s ability to continue
to adopt the going concern basis of accounting. 
Assets 
All assets at 31 March 2025 of which I am aware have been reported in the financial
statements. 
Where a rolling programme of asset valuations has been used, I have satisfied myself that
the carrying amount of assets at 31 March 2025 does not differ materially from that which
would be determined if a revaluation had been carried out at that date. 
I carried out an assessment at 31 March 2025 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified in the
financial statements. 
I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2025. 
There are no plans or intentions that are likely to affect the carrying value or classification
of the assets recognised in the financial statements. 
Owned assets are free from any lien, encumbrance, or charge, except as disclosed in the
financial statements.
Liabilities 
All liabilities at 31 March 2025 of which I am aware have been reported in the financial
statements. 
Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2025 of which I am aware where the conditions specified in
IAS 37, as adapted by the 2024/25 Code, have been met. The amount recognised as a
provision is the best estimate of the expenditure likely to be required to settle the obligation
at 31 March 2025. Where the effect of the time value of money is material, the amount of
the provision has been discounted to the present value of the expected payments. 
Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2025, or to reflect material changes in
the assumptions underlying the calculations of the provisions. 
156

Page 157

The accrual recognised in the financial statements for annual leave untaken by 31 March
2025 has been estimated on a reasonable basis. 
There are no plans or intentions that are likely to affect the carrying value or classification
of the liabilities recognised in the financial statements. 
Contingent Liabilities 
There are no significant contingent liabilities, other than those disclosed in Note 33 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the financial statements. All known contingent liabilities have been
fully and properly disclosed in accordance with IAS 37, as adopted by the 2024/25 Code. 
With specific reference to equal pay claims, I can confirm that it is not possible to quantify
the contingent liability. 
Litigation and Claims 
All known actual or possible legal claims have been disclosed to you and have been
accounted for and disclosed in the financial statements in accordance with the 2024/25
Code. 
Fraud 
I understand my responsibilities for the design, implementation, and maintenance of
internal control to prevent fraud and I believe I have appropriately fulfilled those
responsibilities. 
I have provided you with all information in relation to: 
• my assessment of the risk that the financial statements may be materially misstated as
a result of fraud, 
• any allegations of fraud or suspected fraud affecting the financial statements, and 
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
Laws and Regulations 
I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements. 
Related Party Transactions 
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the
2024/25 Code. I have made available to you the identity of all of North Ayrshire Council’s
related parties and all the related party transactions of which I am aware. 
Remuneration Report 
The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Regulations 2014, and all required information of which I am aware
has been provided to you. 
Management Commentary 
I confirm that the Management Commentary has been prepared in accordance with
statutory guidance, and the information is consistent with the financial statements. 
157

Page 158

Corporate Governance 
I confirm North Ayrshire Council has undertaken a review of the system of internal control
during 2024/25 to establish the extent to which it complies with proper practices set out in
Delivering Good Governance in Local Government: Framework 2016. I have disclosed to
you all deficiencies in internal control identified from this review or of which I am otherwise
aware. 
I confirm that the Annual Governance Statement has been prepared in accordance with
the Delivering Good Governance in Local Government: Framework 2016 and the
information is consistent with the financial statements. There have been no changes in the
corporate governance arrangements, or issues identified, since 31 March 2025 which
require to be reflected in the Annual Governance Statement or annual accounts. 
Group Accounts 
I have identified all the other entities in which North Ayrshire Council has an interest and
have classified and accounted for them in accordance with the 2024/25 Code. Any
significant issues, including those related to fraud and any qualified audit opinions, in
relation to the financial statements of group entities, have been provided to you. Any
significant issues identified by you as group auditor have been communicated to
management of group components, where relevant to those components. 
Common Good Fund 
I confirm, to the best of my ability, that all material common good assets have been
identified and correctly accounted for within the common good financial statements and,
where appropriate, common good assets in use by the Council have been assessed and
accounted for in line with appropriate accounting standards. 
Events Subsequent to the Date of the Balance Sheet 
All events subsequent to 31 March 2025 for which IAS 10, as adopted by the 2024/25
Code, requires adjustment or disclosure have been adjusted or disclosed.
Other representations 
I confirm that the prior year adjustment in relation to the valuation of council houses has
been appropriately accounted for and disclosed in the financial statements in accordance
with ISA (UK) 710. 
Yours sincerely 
Mark Boyd
Chief Financial Officer and Head of Finance
North Ayrshire Council
158

Page 159

HEAD OF FINANCE:  Mark Boyd
Cunninghame House, Irvine KA12 8EE
Tel: 01294 310000  
www.north-ayrshire.gov.uk   
Your Ref:  Our Ref:  
If telephoning please ask for:  Mark Boyd  01294 324560 
23 September 2025 
David Jamieson 
Audit Scotland 
4th Floor, The Athenaeum Building
8 Nelson Mandela Place 
Glasgow 
G2 1BT 
Dear David, 
North Ayrshire Council Trust Funds 
Anderson Park Trust  SC042136 
Douglas Sellers Trust  SC042101 
Margaret Archibald Bequest  SC042117 
North Ayrshire Council Trust  SC025083 
Dalry Trust  SC043644 
Kilbirnie & Glengarnock Trust  SC043600 
Kilwinning Trust  SC043374 
Largs Trust  SC043494 
Annual accounts 2024/25 
This representation letter is provided in connection with your audit of the annual report and
financial statements of North Ayrshire Council Trust Funds, for the year ended 31 March
2025 for the purpose of expressing an opinion as to whether the financial statements give
a true and fair view and have been properly prepared, and for expressing other opinions
on the Trustees Report. 
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your
audit of North Ayrshire Council Trust Funds Annual Report and Financial Statements for
the year ended 31 March 2025. 
General 
I acknowledge my responsibility and that of North Ayrshire Council, as the administering
authority, for the preparation of the 2024/25 financial statements on behalf of the trustees.
All the accounting records requested have been made available to you for the purposes of
your audit. All material agreements and transactions undertaken by the registered
charitable trusts have been properly reflected in the financial statements. All other records
and information have been made available to you, including minutes of all management
and other meetings. 
159

Page 160

The information given in the Trustees’ Annual Reports presents a balanced picture of each
charity and is consistent with the financial statements. 
I am not aware of any uncorrected misstatements.
Financial Reporting Framework 
The annual accounts have been prepared in accordance with the Charities and Trustee
Investment (Scotland) Act 2005, and regulations 9(1), (2) and (3) of the Charities Accounts
(Scotland) Regulations 2006. 
In accordance with the 2006 Regulations, I have ensured that the financial statements
properly present the receipts and payments of the charities for the year ended 31 March
2025 and the transactions for 2024/25. 
Accounting Policies and Estimates 
All material accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2024/25 accounting code
where applicable. All accounting policies applied are appropriate to North Ayrshire Council
Trusts’ circumstances and have been consistently applied. 
Going Concern Basis of Accounting 
I have assessed North Ayrshire Council Trusts’ ability to continue to use the going concern
basis of accounting and have concluded that it is appropriate. I am not aware of any
material uncertainties that may cast significant doubt on North Ayrshire Council Trusts’
ability to continue as a going concern. 
Assets 
The cash fund, land and buildings and investments shown in the Statement of Balances at
31 March 2025 were owned by the registered charities. Assets are free from any lien,
encumbrance, or charge except as disclosed in the financial statements. There are no
plans or intentions that are likely to affect the carrying value of classification of the assets
within the financial statements. 
Liabilities
As reflected in the financial statements there are no liabilities at 31 March 2025 of which I
am aware.
Fraud
I understand my responsibilities for the design, implementation, and maintenance of
internal control to prevent fraud and I believe I have appropriately fulfilled those
responsibilities.
I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated as
a result of fraud,
• any allegations of fraud or suspected fraud affecting the financial statements, and
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements. 
160

Page 161

Laws and Regulations
I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the
2024/25 Code. I have made available to you the identity of all of North Ayrshire Council
Trusts’ related parties and all the related party transactions of which I am aware.
Corporate Governance
I confirm North Ayrshire Council (administering authority) has undertaken a review of the
system of internal control during 2024/25 to establish the extent to which it complies with
proper practices set out in Delivering Good Governance in Local Government: Framework
2016. I have disclosed to you all deficiencies in internal control identified from this review
or of which I am otherwise aware.
Events Subsequent to the Date of the Balance Sheet
All events subsequent to 31 March 2025 for which IAS 10, as adopted by the 2024/25
Code, requires adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Mark Boyd 
Head of Finance, 
North Ayrshire Council, for and on behalf of the trustees of the charities administered by
North Ayrshire Council.
161

Page 162

North Ayrshire
Council
2024/25 Annual Audit Report 
Prepared for North Ayrshire Council and the Controller of Audit 
September 2025
162

Page 163

North Ayrshire Council: 2024/25 Annual Audit Report | 2 
Contents 
Key messages 3
Introduction 6
1. Audit of 2024/25 Annual Accounts 8
2. Best Value audit 24
3. Financial management 32
4. Financial sustainability 46
5. Vision, leadership and governance 54
6. Use of resources to improve outcomes 57
Appendix 1 64
Appendix 2 71 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
163

Page 164

Key messages | 3 
Key messages 
Audit of the annual accounts
1 An unmodified independent auditor’s report has been issued for the 2024/25
Annual Accounts of the council and its group and the eight section 106
charities administered by the council. 
2 The financial statements now give a true and fair view of the financial position
of the council and were properly prepared in accordance with the financial
reporting framework. However a number of significant amendments have
been required to the draft accounts to ensure in particular the non-current
asset figures are fairly stated.  These amendments do not change the
reported outturn position or the usable reserves of the council. 
Best Value
3 The council has continued to demonstrate a strong culture of continuous
improvement.  It has robust arrangements in place to secure Best Value.  The
council has made good progress with prior year Best Value
recommendations.  
4 The council’s transformation programme planning and programme
management arrangements are clear. 
5 Officers are clear that future recurring savings will not be sufficient from
transformation and workforce changes, cuts in services, and council tax and
fees and charges increases are also needed.  In 2024/25 the council released
85 staff which delivered approximately £2.5 million recurring savings. A
further 45 staff reductions are anticipated in 2025/26.  
6 The council actively works with partners to identify better ways of delivering
its ambitions for North Ayrshire
7 The council is systematically measuring and reporting on its performance
across its strategic priorities. 
Financial management
8 Financial management is effective.  The council reported a service
underspend of £17.0 million against its 2024/25 budget and there was a net
increase of £3.489 million in the council’s usable reserves to £129.829
164

Page 165

Key messages | 4 
million. There is planned use of reserves over the medium term to close
funding gaps.
9 A new General Fund Capital Investment Programme 2024/25 to 2033/34 is
used to inform capital investment and support Council Plan priorities. Cost
risks have been identified across a number of projects. 
10 Long term borrowing has increased in support of the council’s capital
programme. The council understands the future revenue implications of
servicing this debt. 
Financial sustainability
11 The council approved a balanced budget for 2025/26, which included a
council tax increase of seven per cent (£5.0m) and the use of £4.0 million of
reserves, non-recurring savings of £9.5 million from reduced pension
contributions and further savings of £4.8 million across directorates. An
extensive programme of engagement and consultation with communities was
undertaken that helped shape the 2025/26 budget.  
12 Risks to delivery of the 2025/26 budget include pay awards in excess of the
budgeted contribution and the financial challenges facing the IJB. 
13 The latest Medium Term Financial Outlook to 2027/28 has identified a
structural funding gap of £46.7 million. While the council currently has
reserves to support the fundings gaps, the reserves can only be spent once. 
The cost base is not sustainable and there is a risk to the longer term
financial sustainability of council services. Elected members will need to
make difficult decisions on how the use of resources is prioritised going
forward, within its recurring funding.  
14 Discussions are also currently ongoing on how greater efficiencies could be
realised through delivering council services differently in partnership with
others. 
Vision, leadership and governance 
15 There is openness and transparency within the council together with
appropriate governance and decision-making arrangements.
16 The council offers a training programme for members in addition to e-learning
and the opportunity to attend Improvement Service events and webinars.
165

Page 166

Key messages | 5 
Use of resources to improve outcomes
17 There has been regular reporting of the council’s progress with its Council
Plan priorities. Good progress has been made in completing actions for year
two of the plan however the council does not set out in advance what criteria
have to be met for an ‘on target’ judgement to be made for each action.  
18 Of the 33 Local Government Benchmarking Framework Performance
Indicators (PIs) directly linked to Council Plan 2023-2028 priorities, seventeen
priority PIs (52%) were within the top two quartiles for 2023/24. 
19 The council’s performance, taken from national benchmarking data, shows an
improving position year-on year, but overall performance relative to other
councils remains constant. 
20 HMIe reported positively on how the council supports schools to improve the
quality of education. 
166

Page 167

Introduction | 6 
Introduction 
1.  Fiona Mitchell-Knight (Audit Director) has been appointed by the
Accounts Commission as auditor of North Ayrshire Council for the period
from 2022/23 until 2026/27. The 2024/25 financial year was the third of her
five-year appointment. Her appointment coincides with the Code of Audit
Practice which was introduced for financial years commencing on or after
1 April 2022.
2.  We would like to thank councillors, senior management, and other staff,
particularly those in finance, for their cooperation and assistance this year.
3.  This report summarises the findings from the 2024/25 annual audit of
North Ayrshire Council (the council). The scope of the audit was set out in
our Annual Audit Plan presented to the 13 March 2025 meeting of the
Audit and Scrutiny Committee. This Annual Audit Report comprises:
• significant matters arising from an audit of the council’s Annual
Accounts. 
• conclusions on the council’s performance in meeting its Best Value
duties.
• conclusions on the following wider scope areas that frame public
audit as set out in the Code of Audit Practice 2021:
− Financial Management 
− Financial Sustainability 
− Vision, Leadership, and Governance
− Use of Resources to Improve Outcomes.
4.  This report is addressed to the members of council and the Controller of
Audit and will be published on Audit Scotland's website www.audit-
scotland.gov.uk in due course.
Responsibilities and reporting
5.   The council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing Annual Accounts that
are in accordance with proper accounting practices. The council is also
responsible for compliance with legislation and putting arrangements in
place for governance and propriety that enable it to successfully deliver its
objectives.
167

Page 168

Introduction | 7 
6.  The responsibilities of the independent auditor are established by the
Local Government (Scotland) Act 1973 and the Code of Audit Practice
2021, and supplementary guidance and International Standards on
Auditing in the UK. 
7.  Weaknesses or risks identified are only those which have come to our
attention during our normal audit work and may not be all that exist.
Communicating these does not absolve management of the council from
its responsibility to address the issues we raise and to maintain adequate
systems of control.
8.  This report contains an agreed action plan at Appendix 1. It sets out
specific recommendations, the responsible officers, and dates for
implementation. 
Communication of fraud or suspected fraud.
9.  In line with ISA (UK) 240 (The Auditor's Responsibilities Relating to
Fraud in an Audit of Financial Statements), in presenting this report to the
Audit and Governance Panel we seek confirmation from those charged
with governance of any instances of actual, suspected, or alleged fraud
that should be brought to our attention. Should members have any such
knowledge or concerns relating to the risk of fraud within the council, we
invite them to communicate this to the appointed auditor for consideration
prior to the Annual Accounts being certified. 
Auditor Independence
10.  We can confirm that we comply with the Financial Reporting Council’s
Ethical Standard. We can also confirm that we have not undertaken any
non-audit related services and we are not aware of any relationships that
could compromise our objectivity and independence.
11.  We add value to the council by:
• Identifying and providing insight on significant risks and making
clear and relevant recommendations. 
• Providing clear and focused conclusions on the appropriateness,
effectiveness and impact of corporate governance, arrangements to
ensure the best use of resources and financial sustainability.
• Sharing intelligence and good practice identified. 
168

Page 169

1. Audit of 2024/25 Annual Accounts | 8 
1. Audit of 2024/25 Annual
Accounts
The council is required to prepare Annual Accounts comprising financial
statements and other related reports. These are principal means of
accounting for the stewardship public funds. 
Main judgement
An unmodified independent auditor’s report has been issued
for the 2024/25 Annual Accounts of the council and its group
and the eight section 106 charities administered by the
council. 
The financial statements now give a true and fair view and
were properly prepared in accordance with the financial
reporting framework. However a number of significant
amendments have been required to the draft accounts to
ensure in particular the non-current asset figures are fairly
stated.   
Identified misstatements of £82.374 million , were adjusted for
in the Annual Accounts and we have a number of significant
findings to report. These adjustments to not change the
reported outturn position or the usable reserves of the council.
The audited part of the Management Commentary, Annual
Governance Statement and Remuneration Report were all
consistent with the financial statements and properly prepared
in accordance with the relevant regulations and guidance.
Audit opinions on the Annual Accounts of the council and
its group are unmodified. 
12.  The Annual Accounts for the council and its group for the year ended
31 March 2025 were approved by the Audit and Scrutiny Committee on 23
September 2025. As reported in the independent auditor’s report:
• The financial statements give a true and fair view and were properly
prepared in accordance with the financial reporting framework.
169

Page 170

1. Audit of 2024/25 Annual Accounts | 9 
• The audited part of the Management Commentary, Annual
Governance Statement and Remuneration Report were all
consistent with the financial statements and properly prepared in
accordance with the relevant regulations and guidance.
13.  We concluded that there were no matters upon which we are required
to report, by exception, to the Accounts Commission.
The unaudited Annual Accounts were received in line with
the agreed audit timetable.
14.  The unaudited Annual Accounts were received in line with our agreed
audit timetable on 25 June 2025. The Annual Accounts submitted for audit
were of a good standard and supporting working papers were reasonable.
Finance staff provided good support to the audit team which helped
ensure the final accounts audit process ran smoothly.
Audit Fee
15.  The audit fee for the 2024/25 audit was reported in the Annual Audit
Plan and was set at £384,980. We have also agreed an audit fee of
£1,100 for the audit of the registered charities administered by the council. 
There have been no developments that impact on planned audit work
required, therefore the audit fee reported in the Annual Audit Plan remains
unchanged.  
Our audit testing reflected the calculated materiality levels.
16.  Broadly, the concept of materiality is applied by auditors to determine
whether misstatements identified during the audit could reasonably be
expected to influence the economic decisions of users of the financial
statements, and hence impact their opinion set out in the independent
auditor’s report. Auditors set a monetary threshold when considering
materiality, although some issues may be considered material by their
nature. It is ultimately a matter of the auditor’s professional judgement.
17.  Our initial assessment of materiality was carried out during the risk
assessment and planning phase of the audit. This was reviewed on receipt
of the unaudited Annual Accounts and is summarised in exhibit 1. 
Exhibit 1
Materiality values for the council and its group 
Materiality Council Group
Overall materiality: This is the figure we calculate to assess the overall
impact of audit adjustments on the financial statements. Materiality has
been set based on our assessment of the needs of the users of the
£16.5
million
£20.4
million
170

Page 171

1. Audit of 2024/25 Annual Accounts | 10 
financial statements and the nature of the council’s operations. It has
been set at 2 per cent of gross expenditure as at 31 March 2025.
Performance materiality: This acts as a trigger point. If the aggregate
of errors identified during the Annual Accounts audit exceeds
performance materiality, this would indicate that further audit
procedures should be considered. Using our professional judgement,
we have assessed performance materiality at 65 per cent of overall
materiality.
£11.5
million
£14.3
million
Reporting threshold: We are required to report to those charged with
governance on all unadjusted misstatements more than the ‘reporting
threshold' amount.
£0.500
million
£1.0
million
Source: Audit Scotland
Identified misstatements of £82.374 million were adjusted
in the 2024/25 accounts.
18.  We identified misstatements of £82.374 million in the unaudited
Annual Accounts. These arose as a result of classification and valuation of
Property, Plant and Equipment.  Management have adjusted the Annual
Accounts to correct the identified issues. In addition a prior year
adjustment resulted in a reduction of £33.673 million in the valuation of the
council’s housing stock in 2023/24.
19.  Further details of these adjustments are included in Exhibit 2.
We have significant findings to report on our audit of the
Annual Accounts.  A number of significant amendments
have been required to ensure in particular the non-current
asset figures are fairly stated.   
20.  Under ISA (UK) 260 (Communication with Those Charged with
Governance), we communicate significant findings from the audit to
members, including our view about the qualitative aspects of the council’s
accounting practices.
21.  The Code of Audit Practice also requires all auditors to communicate
key audit matters within the Annual Audit Report under ISA (UK) 701
(Communicating key audit matters in the Independent Auditor’s Report).
These are matters that we judged to be of most significance in our audit of
the financial statements. Our significant findings are detailed in exhibit 2.
Where a finding has resulted in a recommendation to management, a
cross reference to the action plan in Appendix 1 has been included.
22.  The qualitative aspects of the council’s accounting practices,
accounting policies, accounting estimates and accounts disclosures are
satisfactory and appropriate. In accordance with normal audit practice, a
171

Page 172

1. Audit of 2024/25 Annual Accounts | 11 
few presentational and disclosure amendments were discussed and
agreed with management. The disclosure changes were satisfactory.
Exhibit 2
Significant findings and key audit matters from the audit of the Annual Accounts 
Issue Resolution 
1. Application of International Financial
Reporting Standard (IFRS) 16
IFRS 16 Leases applied for the first time in 2024/25
and we identified this as an area where there was a
significant risk of material misstatement. 
Through our audit procedures, we identified
significant errors in the methodology adopted to
apply IFRS 16: 
• On transition to IFRS 16, the council discounted
the existing lease liability. This accounts for the
concept of time value of money and the principle
that money today is worth more than the same
amount in the future. Under the previous accounting
standard that applied, International Accounting
Standard (IAS) 17, the leases had already been
discounted. The council discounted the lease liability
again in error resulting in a £24.861 million
understatement of the council’s lease liability.
• IFRS 16 states that the lease liability should be
remeasured when changes due to indexation take
effect in the cash flows. The council’s service
concession contracts all increase on the 1 April in
line with changes in the RPI index. The increase in
the council’s lease payments due to changes in the
RPI index were inaccurately applied resulting in an
overstatement of the council’s lease liability. 
Correction for this is included in the overall
remeasurement of £24.861 million above.
• Clyde Valley Waste is a Private Financial
Initiative (PFI) contract which the council has a 17%
share in. The council had not initially applied IFRS
16 to this contract. After discussion with other local
authorities, the council judged that IFRS 16 should
apply to this agreement. We agree with this view.
This resulted in a £0.692 million understatement of
the council’s lease liability.
The council have amended the
2024/25 accounts.  
The value of the council’s lease liability
has increased by £25.553 million. 
Recommendation 1 – Appendix 1
Action Plan 
172

Page 173

1. Audit of 2024/25 Annual Accounts | 12 
Issue Resolution 
2. i3 Strategic Investment Campus
In 2024/25, the council agreed to sell the i3
Strategic Investment Campus in Irvine. 
In error, on putting the asset up for sale, the council
created a new asset and did not re-classify the
existing asset on its asset register. This resulted in
the asset being double counted on the Balance
Sheet. 
The council have amended the
2024/25 accounts. 
The value of Property, Plant and
Equipment on the Balance Sheet has
reduced by £7.281 million. In addition,
the revaluation reserve has reduced by
£4.1 million and impairments
recognised in the Comprehensive
Income and Expenditure Statement
have increased by £3.181 million.
Recommendation 1 – Appendix 1
Action Plan 
3. Garages and Lockups
The council own 203 lock-up garages and 1,217
garage sites which were all valued in 2024/25. 
In error, the council included the £0.880 million
value of these sites in both council dwellings and
land and buildings. This resulted in the asset being
double counted on the Balance Sheet.  
The council have amended the
2024/25 accounts. 
The value of Property, Plant and
Equipment on the Balance Sheet has
reduced by £0.880 million. 
Recommendation 1 – Appendix 1
Action Plan 
4. Moorpark Primary School
The newly built Moorpark Primary School was
operational in October 2024. At this point, the old
school was no longer being used and should have
been classified as a surplus asset. 
In the 2024/25 unaudited accounts, we identified
that the council were in error still classifying the old
school building as an operational asset. We have
been advised the old school is due to be demolished
in 2025/26. 
The council have amended the
2024/25 accounts. 
Confirmation of classification as a
surplus asset resulted in a reduction in
value of £1.250 million. 
Recommendation 1 – Appendix 1
Action Plan 
5. Assets Held for Sale
Accounting standards prescribe assets should only
be classified as held for sale if it is expected the
assets will be disposed of in the next 12 months. 
We identified two assets where the council had
estimated that the assets would be sold in 2026/27.
As this is over the 12 month period, both assets
should have been classified as surplus assets rather
than assets held for sale. 
The council have amended the
2024/25 accounts. 
Surplus assets have increased by
£4.742 million and assets held for sale
have reduced by the same amount. 
Recommendation 1 – Appendix 1
Action Plan 
6. External Works 
A significant proportion by value of the council’s
assets are valued on a Depreciated Replacement
Cost (DRC) basis.  For DRC valuations, we would
The council have amended the
2024/25 accounts.
173

Page 174

1. Audit of 2024/25 Annual Accounts | 13 
Issue Resolution 
normally expect an external works value to be
added to the base calculation to include costs of
paving, lighting and fencing for example. In the DRC
valuations undertaken in 2024/25, there was no
value added for external works. 
Following discussion with the council’s valuers, it
was agreed that an external works percentage of
5% should be added to schools revalued in 2024/25
which in the valuers’ professional opinion is a
reasonable estimate across the asset class.  For
other DRC assets revalued during 2024/25 we
agreed that no external works value required to be
added, as costs for external works were considered
minimal. 
The value of Property, Plant and
Equipment on the Balance Sheet has
increased by £2.037 million.  
Recommendation 1 – Appendix 1
Action Plan 
7. Valuation of Assets, Differs Materially
In Note 40 to the unaudited accounts ‘Assumptions
Made About the Future and Other Major Sources of
estimation uncertainty’, the council noted that a
materiality threshold of £15.8 million, per asset
group, was set in order to determine if the value of
assets (with a valuation date other than 31 March
2025) was materially different from their carrying
values as at 31 March 2025.  The note also
explained that when applied to the value of
Depreciated Replacement Cost assets which had
not been valued in 2024/25, this indicated that the
closing value of this asset group may have been
£24.4 million lower than their reported value if they
had been revalued in 2024/25.
In accordance with agreed procedures, a more
detailed review was undertaken by Royal Institute of
Chartered Surveyors (RICS) qualified staff to assess
the impact on values of all other assets within the
DRC category of assets.  The review raised
significant concerns relating to the basis of valuation
used in the 2022/23 external valuation of school
properties and the valuation team completed a
desktop exercise to estimate the potential decrease
in value of all those properties impacted. This
resulted in a reduction in the valuation of £49.447
million for those schools which has been adjusted
for in the 2024/25 accounts.  A prior year
restatement was not required.  This will be
supplemented by a full valuation exercise for all
impacted school properties during 2025/26. 
The council have amended the
2024/25 accounts.
The value of Property, Plant and
Equipment on the Balance Sheet has
reduced by £49.447 million
We are satisfied that the assets
covered by this year’s valuation
programme, together with the further
work undertaken and the adjustments
made to the 2024/25 accounts, have
provided sufficient evidence that there
is no further indication of material
movements with those assets not
subject to revaluation in 2024/25.
Recommendation 1 – Appendix 1
Action Plan 
174

Page 175

1. Audit of 2024/25 Annual Accounts | 14 
Issue Resolution 
8. Prior year adjustment to valuation of council
houses
In previous years the average rent figure used in the
valuations of the council’s stock incorrectly included
properties used for temporary accommodation at a
significantly higher weekly rent.  The council
excluded these from the 2024/25 valuation but did
not apply a retrospective adjustment to the 2023/24
valuation as required by accounting standards.   
The council have amended the
2023/24 accounts.
The value of Property, Plant and
Equipment on the Balance Sheet has
reduced by £33.673 million.   
9. Pension balance
The funded pension balance represents the
difference between expected future payments to
pensioners and the underlying value of pension fund
assets available to meet this liability. 
The council is a member of Strathclyde Pension
Fund. Valuation of pension fund assets and
liabilities is assessed by an independent firm of
actuaries (Hymans Robertson LLP). Pension assets
and liabilities are calculated annually for each
individual member body, by the actuary, for
inclusion in the Annual Accounts. Annual valuations
are dependent on a number of external variables,
including projected rates of return on assets,
projected rates of price and pay inflation, interest
rates, and mortality estimates. 
As required by accounting standards, the amount
that can be recognised as an asset is limited to the
estimated future service cost less the minimum
contribution required, otherwise known as the asset
ceiling.
The asset shown in the council’s Balance Sheet has
been limited to £0 for 2024/25 (2023/24 asset of £0). 
Additionally, the council’s Balance Sheet includes
an amount for discretionary enhancements to
retirement benefits e.g. payments for early
retirement. These are referred to as unfunded
liabilities as they are paid by the council rather than
the pension fund. Although they are treated the
same way as retirement benefit costs as explained
above, the council does not have a right to set off
the unfunded liability against a pension asset. The
unfunded liability recognised in the council’s
Balance Sheet is £20.067 million (2023/24: £23.183
million). 
We are satisfied that the council’s
disclosure, and accounting treatment,
of its pension balance complies with
required accounting practices. 
175

Page 176

1. Audit of 2024/25 Annual Accounts | 15 
Source: Audit Scotland
Other matters identified from our audit of the Annual
Accounts
23.  In addition to our findings in exhibit 2 above, the following was
identified through our audit testing:
• Impairment of non-current assets: Accounting standards require
the council to assess at the end of each financial year whether
there are any indications an asset is impaired. Most assets are
valued at least every five years and generally when valued, each
asset is subject to a physical inspection. There are however some
assets that are never revalued. The council’s impairment review is
largely limited to assets revalued and should be made more robust
and comprehensive. In our opinion that has not resulted in a
material misstatement of the assets at 31 March 2025. 
Recommendation 2
In order to prevent overstatement of asset values, an
impairment review should be conducted whenever there
is an indication that an asset might be impaired such as
physical damage, obsolescence or restructuring. The
existence of an impairment indicator may also suggest
that the remaining useful life needs to be adjusted even if
no impairment loss is recognised.  
24.  The council’s 2024/25 Management Commentary provides a fair and
balanced picture of its performance and operational activity for the year.
25.  The Annual Governance Statement provides an appropriate level of
disclosure on the council’s governance arrangements during 2024/25. 
26.  The audited part of the Remuneration Report was consistent with the
Annual Accounts and has been prepared in accordance with applicable
regulations.
Our audit work responded to the risks of material
misstatement we identified in the Annual Accounts.
27.  We have obtained audit assurances over the identified significant risks
of material misstatement in the Annual Accounts. Exhibit 3 sets out the
significant risks of material misstatement to the financial statements we
identified in our 2024/25 Annual Audit Plan. It also summarises the further
176

Page 177

1. Audit of 2024/25 Annual Accounts | 16 
audit procedures we performed during the year to obtain assurances over
these risks and the conclusions from the work completed. 
Exhibit 3
Significant risks of material misstatement in the Annual Accounts 
Audit risk  Assurance procedure Results and conclusions
1. Risk of material
misstatement due to fraud
caused by management
override of controls 
As stated in ISA (UK) 240
(The Auditor's
Responsibilities Relating to
Fraud in an Audit of
Financial Statements),
management is in a unique
position to perpetrate fraud
because of their ability to
override controls that
otherwise appear to be
operating effectively. 
Assess the adequacy of controls
in place for identifying and
disclosing related party
relationship and transactions in
the financial statements. 
Assess the design and
implementation of controls over
journal entry processing.
Make inquiries of individuals
involved in the financial
reporting process about
inappropriate or unusual activity
relating to the processing of
journal entries and other
adjustments.
Test journals at the year-end
and post-closing entries and
focus on significant risk areas. 
Evaluate significant transactions
outside the normal course of
business.
We will assess any changes to
the methods and underlying
assumptions used to prepare
accounting estimates compared
to the prior year.
Substantive testing of income
and expenditure transactions
around the year-end to confirm
they are accounted for in the
correct financial year.
Focussed testing of accounting
accruals and prepayments.  
Results: Our critical
assessment of the council’s
arrangements for identifying
and disclosing related party
transactions found
arrangements in place were
satisfactory.
We assessed the design and
implementation of controls
over journal entry processing.
No issues were identified. 
Journal adjustments were
tested, and no indication of
management override of
controls were found. 
We reviewed transactions
during the year - no issues
were identified with significant
transactions outside the
normal course of business. 
Judgements and estimations
applied were tested to
confirm they were appropriate
and reasonable. 
We tested accruals and
prepayments and confirmed
that income and expenditure
was properly accounted for in
the financial year. 
Conclusion: No instances of
management override of
controls were identified. 
2. Valuation of Property,
Plant and Equipment 
North Ayrshire Council
held £1,313.3 million of
Review the information provided
to the valuer to assess for
completeness.
Results: We did not identify
any issues with the
information provided to the
valuer. However our review
identified a number of issues
177

Page 178

1. Audit of 2024/25 Annual Accounts | 17 
Audit risk  Assurance procedure Results and conclusions
property, plant, and
equipment (PPE) at 31
March 2024, of which
£1,052.4 million was land
and building assets. North
Ayrshire Council is
required to value land and
building assets at existing
use value where an active
market exists for these
assets. Where there is no
active market, these
assets are valued on a
depreciated cost
replacement (DRC) basis.
As a result, there is a
significant degree of
subjectivity in these
valuations which are
based on specialist
assumptions, and changes
in the assumptions can
result in material changes
to valuations.
Risk: Valuations of these
assets are materially
misstated.
Evaluate the competence,
capabilities, and objectivity of
the professional valuer.
Obtain an understanding of
management’s involvement in
the valuation process to assess
if appropriate oversight has
occurred.
Critically evaluate the approach
the council has adopted to
assess the risk that assets not
subject to valuation are
materially misstated and
consider the robustness of that
approach.
Test the reconciliation between
the financial ledger and the
asset register.
Evaluate management’s
assessment of why it considers
that the land and buildings not
revalued in 2024/25 are not
materially misstated. We will
critically assess the
appropriateness of any
assumptions.
Critically assess the adequacy
of the council’s disclosures
regarding the assumptions in
relation to the valuation of other
land and buildings and council
dwellings.
relating to the classification
and valuation of PPE.
Our review of the council’s
valuation team’s work, and
the current external valuer,
identified that External Works
had been incorrectly
excluded from valuations of
DRC properties undertaken
during 2024/25. We did not
identify any further non-
compliance with RICS
guidance.
An internal review raised
significant concerns relating
to the basis of valuation used
in the 2022/23 external
valuation of school
properties.    
We found that management
have an appropriate level of
involvement and oversight of
the valuation process.
We did not identify any issues
with the reconciliation
between the financial ledger
and the property asset
register. 
We found that appropriate
disclosures have been made
regarding the assumptions in
relation to the valuation of
land and buildings.
Conclusion:  We concluded
that the assets covered by
this year’s valuation
programme, together with the
further work undertaken and
the required amendments to
the 2024/25 accounts, have
provided sufficient evidence
that there is no evidence of
material misstatement of
asset values.  The required
178

Page 179

1. Audit of 2024/25 Annual Accounts | 18 
Audit risk  Assurance procedure Results and conclusions
amendments are set out in
Exhibit 2 above.  
3. Implementation of
IFRS 16 
From 1 April 2024, a new
International Financial
Reporting Standard, IFRS
16, came into effect for
Local Authorities. IFRS 16
introduces a new ‘Right of
Use’ asset class to the
Balance Sheet and
recognises the
corresponding lease
liability. This applies to all
leases – property, land,
vehicles, plant, and
equipment. Specifically,
this will also impact on the
council’s school service
concession arrangements
(PPP and DBFM). IFRS 16
will change the way in
which the council accounts
for operating leases,
including recognising
assets and liabilities for the
rights and obligations
arising from leases
previously classified as
operating leases.
Risk: Valuations of these
leases are materially
misstated. 
Evaluate the design and
implementation of controls
established by the council over
the implementation of IFRS 16. 
Assess whether service
concession arrangements have
been accounted for in
accordance with the
requirements of IFRS 16. 
Test the IFRS 16 transitional
accounting adjustments and
confirm these are accurate and
comply with the financial
reporting framework.
Results
On transition to IFRS 16, the
council discounted the
existing lease liability.
However, under IAS 17 the
lease had already been
discounted resulting in an
understatement of the
council’s lease liability.
The council’s service
concession contracts all
increase on the 1 April in line
with changes in the RPI
index. The increase in the
council’s lease payments due
to changes in the RPI index
were inaccurately applied
resulting in an overstatement
of the council’s lease liability.
The council incorrectly judged
that IFRS 16 did not apply to
a PFI contract in which the
council has a share.   This
resulted in a  understatement
of the council’s lease liability.
Conclusion: We identified
significant errors in the
methodology adopted to
apply IFRS 16. The required
amendments to the 2024/25
accounts are set out in
Exhibit 2 above. 
Source: Audit Scotland
179

Page 180

1. Audit of 2024/25 Annual Accounts | 19 
Correspondence referred to the auditor by Audit
Scotland/Statutory objections to the accounts
28.  We received an objection to the accounts covering issues related to
the Largs Common Good Fund and Trust Funds. We met with the objector
and considered the issues and evidence provided. We are satisfied that
this did not identify any issues which had an impact on our opinion on the
financial statements. 
29.  Through consideration of the objection, it has been identified that the
council has not held an annual putting competition in Largs, to meet the
requirements of the Isabella McPhee Memorial Fund. Based on the low
numbers of entrants in a similar competition planned previously, there was
not sufficient income available from the trust fund to meet the costs of
organising the competition and awarding prizes. 
30.  The council no longer operates the putting green directly.  In March
2024, Cabinet approved the lease of Mackerston Putting Green and
associated kiosk for a period of five years on a full repairing and insuring
lease at a rent of £2,000 per annum.  No proposals have been received
from any third parties, either members of the community or the lessee, to
hold a putting competition.
Qualitative aspects of accounting practices
31.  ISA (UK) 260 also requires auditors to communicate their view about
qualitative aspects of the council’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies
32.  The appropriateness of accounting policies adopted by the council
was assessed as part of the audit. These were considered to be
appropriate to the circumstances of the council, and there were no
significant departures from the accounting policies set out in the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). 
Accounting estimates
33.  Accounting estimates are used in number of areas in the council’s
financial statements, including the valuation of land and buildings assets
and the valuation of the pension liability. Audit work considered the
process management of the council has in place around making
accounting estimates, including the assumptions and data used in making
the estimates, and the use of any management experts. Audit work
concluded:  
• There were no issues with the selection or application of methods,
assumptions, and data used to make the accounting estimates, and
these were considered to be reasonable. 
180

Page 181

1. Audit of 2024/25 Annual Accounts | 20 
• There was no evidence of management bias in making the
accounting estimates.
34.  Details of the audit work performed and the outcome of the work on
accounting estimates that gave rise to significant risks of material
misstatement are outlined in Exhibit 3.
Disclosures in the financial statements
35.  The adequacy of disclosures in the financial statements was assessed
as part of the audit. The quality of disclosures was adequate, with
additional levels of detail provided for disclosures around areas of greater
sensitivity, such as financial instruments and valuation of the pension
liability.  
Group audit
36.  The body is part of a group and prepares group financial statements.
The group is made up of seven components, including the council which is
the parent of the group. As outlined in the Annual Audit Plan, audit work
was required on two of the group’s components for the purposes of the
group audit, and this work was performed by a combination of the audit
team and the components’ audit teams. Group audit instructions were
issued to component auditors, where required, to outline the expectations
and requirements in performing the audit work for the purposes of the
group audit. The audit work performed on the group’s components is
summarised in Exhibit 4. 
Exhibit 4
Summary of audit work on the group’s components 
Group
component 
Audit procedures  Results of audit work performed 
North Ayrshire
Council
Audit Scotland– full scope
audit
See above; the results of the work are as
reported in this Annual Audit Report 
Common Good
Funds
Audit Scotland– analytical
procedures at group level
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
Trust Funds  Audit Scotland– analytical
procedures at group level
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
North Ayrshire
Ventures Trust 
Analytical procedures at
group level  
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
181

Page 182

1. Audit of 2024/25 Annual Accounts | 21 
Group
component 
Audit procedures  Results of audit work performed 
North Ayrshire
Leisure
Limited*
Analytical procedures at
group level  
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
Strathclyde
Partnership for
Transport
Audit Scotland– obtained
assurances on the audit
procedures carried out on
the valuation of land and
buildings in SPT
Assurances obtained on the audit procedures
carried out on management override,
valuation of land and buildings and valuation
of pension liability balance in SPT.
Strathclyde
Concessionary
Travel Scheme
Joint Board
Audit Scotland – analytical
procedures at group level
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
Ayrshire
Valuation Joint
Board
Audit Scotland – analytical
procedures at group level
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
North Ayrshire
Integration
Joint Board
Audit Scotland – analytical
procedures at group level
Analytical procedures at the group level were
performed by the audit team, and no
significant issues were identified. 
Source:Audit Scotland
*The unaudited group accounts were prepared using the 2023/24
accounts for North Ayrshire Leisure Limited as the 2024/25 accounts
are not yet available.  We are satisfied that this has not had a material
impact on the group accounts .  
Good progress has been made on prior year audit
recommendations relating to the Annual Accounts.
37.  The council has made good progress towards implementing the two
agreed prior year recommendations relating to the Annual Accounts. Both
remain ongoing.  The Best Value recommendations are considered in the
next section of this report and the charities recommendation is considered
at paragraphs 43 to 45 below. For actions not yet completed, full
implementation is planned for 2025/26 with the exception of the charities
recommendation, as recorded in Appendix 1.
182

Page 183

1. Audit of 2024/25 Annual Accounts | 22 
Our audit opinions on the Annual Accounts of the eight
section 106 charities administered by the council are
unmodified.
38.  Elected members of the council are trustees for eight registered
Scottish charities: 
Anderson Park Trust – Charity number SC042136 
Douglas Sellers Trust – Charity number SC042101 
Margaret Archibald Bequest - Charity number SC042117 
North Ayrshire Council Trust – Charity number SC025083 
Dalry Trust – Charity number SC043644 
Kilbirnie & Glengarnock Trust – Charity number SC043600 
Kilwinning Trust – Charity number SC043374 
Largs Trust – Charity number SC04349439. 
39.  The trust balances are disclosed in a note in the council’s Annual
Accounts but do not represent assets of the council so are not included
within the cash and cash equivalents figure shown in the council’s balance
sheet. 
40.  As a result of the interaction of the Local Government in Scotland Act
1973 with the charities legislation, a full and separate independent
auditor's report is required for the statement of accounts of each registered
charity where members of North Ayrshire Council are sole trustees,
irrespective of the size of the charity. 
41.  Our duties as auditors of the charities administered by North Ayrshire
Council are to:
• Express an opinion on whether the charity’s financial statements
properly present the charity’s financial position and are prepared in
accordance with charities legislation. 
• Read the Trustees’ Annual Report and express an opinion as to
whether it is consistent with the financial statements. 
• Report on other matters, by exception, to the Trustees and to the
Office of the Scottish Charity Regulator (OSCR). 
42.  The council has made full use of the connected charities provision and
reports all charities within one set of accounts. 
43.  Seven trusts have been dormant for a period of 3 years or more and of
these, three Trusts have been dormant for over 7 years. The dormancy of
183

Page 184

1. Audit of 2024/25 Annual Accounts | 23 
each identified Trust is disclosed on page 6 of the Trustees annual report.
There is no clear plan on how to bring these Trusts back in to use. It is
therefore unlikely that these Trusts meet the requirement of public benefit.
This was raised as a recommendation in our 2022/23 Annual Audit Report.
The council will continue to promote the various funding sources, trusts
and bequests available for distribution, ensuring that our staff teams,
partners and communities are aware of the available financial supports as
recorded in Appendix 1.
44.  In order to encourage the utilisation of funds across communities, in
particular where the Trusts have been dormant or have low levels of
income, the Council agreed in February 2025 that, with the exception of
those Trusts with significant balances, the full balance of the Trusts are
approved as available for disbursement in 2025/26. Any disbursement
which utilises the full capital balance will result in closure and will require
the approval of OSCR. 
45.  During 2024/25 the remaining capital within James Dyer Simpson
Fund, H Watt Trust and J H Watt Trust, held within the North Ayrshire
Charitable Trust, was disbursed.  Approval will be sought from OSCR for
winding up of these Trusts. During 2025/26, the funds within Dalry Trust,
Kilwinning Trust, Kilbrinie & Glengarnock Trust, Largs Trust, Douglas
Sellers Trust and Anderson Park Trust will be exhausted.  Approval will
also be sought from OSCR for the disbursement of any remaining capital
and winding up of these Trusts.
46.  The Council approved the Trust Fund Investment Strategy 2024/25 on
18 December 2024.  The Strategy set out the principles which ensure that
all investments are made on a socially responsible basis.  Following an
assessment of the external investments held by the Margaret Archibald
Trust and the North Ayrshire Council Charitable Trust, two specific
shareholdings have been identified as being inconsistent with the strategy
and will be sold.  The capital receipts will be reinvested through North
Ayrshire Council’s Loans Fund.
47.   We have given an unqualified opinion on the Annual Accounts of the
eight charities administered by the council. 
184

Page 185

2. Best Value audit | 24 
2. Best Value audit 
Councils have a statutory duty to make arrangements to secure
continuous improvement in the performance of their functions.
Conclusion
The council has continued to demonstrate a strong culture of continuous
improvement.  It has robust arrangements in place to secure Best Value. 
The council has made good progress with prior year Best Value
recommendations. 
The council’s transformation programme planning and programme
management arrangements are clear. 
Officers are clear that future recurring savings will not be sufficient from
transformation and workforce changes, cuts in services, and council tax
and fees and charges increases are also needed.  There is scope for
the council to consider opportunities for more radical transformational
change with partners.
The council is systematically measuring and reporting on its
performance across its strategic priorities. Good progress has been
made in completing actions in year two of the Council Plan. 
The council actively works with partners to identify better ways of
delivering its ambitions for North Ayrshire.
The council complies with the requirements of the Statutory
Performance Information Direction.
Best Value work in 2024/25
48.  Councils have a statutory duty to make arrangements to secure
continuous improvement in the performance of their functions.
Expectations are laid out in the Best Value Revised Statutory Guidance
2020. 
49.  As set out in the Code of Audit Practice 2021, Best Value audit is
integrated with other wider-scope annual audit work. For 2024/25 the
scope of Best Value work included conclusions on:
185

Page 186

2. Best Value audit | 25 
• The Accounts Commission’s requested thematic work on
Transformation – How councils are redesigning and delivering more
efficient services to achieve planned outcomes.”
• Progress made against Best Value improvement actions made in
previous years. 
• Council service performance improvement. 
• Effectiveness of council performance reporting. 
50.  In addition to the work set out in the remainder of this section, Best
Value work has informed the content and conclusions set out in parts 3 to
6 of this Annual Audit Report.  We have concluded that the council has
continued to demonstrate a strong culture of continuous improvement.  It
has robust arrangements in place to secure Best Value.
51.  At least once over the five-year appointment, the Controller of Audit
will report to the Accounts Commission on the Council’s performance in
meeting its Best Value duties. North Ayrshire Council is included in the
third year of the programme. The Controller of Audit Report will be
discussed with the Accounts Commission in October 2025. 
The council’s transformation planning and programme
management arrangements are clear. Officers are clear that
future recurring savings will not be sufficient from
transformation and workforce changes, cuts in services,
and council tax and fees and charges increases are also
needed.
52.  This year auditors were asked to focus on how the council is
redesigning and delivering more efficient services to achieve planned
outcomes. The results of this work were reported to the council’s elected
members at the May 2025 Audit and Scrutiny Committee. 
53.  The key findings in this report were as follows: 
• The council’s current transformation programme, known as its
Sustainable Change Programme, was approved in 2023 and clearly
sets out how it intends to transform its services, in line with its
priorities, through five workstreams and six service reviews.
Between 2021/22 and 2024/25 the council achieved financial
efficiencies from its Sustainable Change Programme of £3.136
million. It plans to make further efficiencies of £8.5 million over the
next three years. 
• The council’s latest Medium Term Financial Outlook has identified a
structural funding gap of £46.7m in the three-year period to 2027/28
(including HSCP pressures). Projected savings from transformation
fall significantly short of the savings required. Officers are clear that
186

Page 187

2. Best Value audit | 26 
future recurring savings also need to be made through workforce
changes, cuts in services, and council tax and fees and charges
increases. However, the transformation programme needs to be
sufficiently ambitious to respond to the scale of the financial
challenges. 
• The council has robust officer-led governance arrangements in
place to monitor its Sustainable Change Programme through its
Transformation Board. The Executive Leadership Team are all
members of the Transformation Board and so are well-sighted on
the council’s transformation projects. However, there is scope for
the council to improve its public reporting on transformation to
provide assurance about how the council plans to change, to
sustain services in the future. 
• The council has a well-established and well-resourced
transformation team. It has a Change and Service Redesign Fund -
an investment fund created by the council more than eight years
ago to help drive transformation. Nearly £0.8 million has been
drawn down from the Fund in the last two years although not all of
this has been spent on transformation. 
• The council has shared examples of where it is working well with
partners to deliver transformation with the aim of generating savings
and improving outcomes, but its current transformation programme
is primarily internally focused. There is scope for the council to
consider opportunities for more radical transformational change with
partners. 
• There are discussions ongoing across the senior leadership of
North Ayrshire, East Ayrshire and South Ayrshire Councils to
explore further opportunities for public sector reform and
collaboration including the Ayrshire Economic Strategy. These
developments will be subject to scrutiny by elected members as
they progress. Elected members will need to make difficult
decisions on how the use of limited resources is prioritised going
forward. Plans need to be innovative and ambitious. 
• The council has provided good examples of consulting with its
communities in relation to transformation projects and using the
results to influence how services are delivered. The recent
extensive budget engagement process included consultation with
residents on many activities overseen by the Transformation Board. 
• The council provides regular and detailed information on the
financial and non-financial benefits of individual transformation
workstreams and service reviews to the Transformation Board. The
benefits of individual projects are also reported in individual council
reports. 
187

Page 188

2. Best Value audit | 27 
• The council has provided evidence of using Equality and Children’s
Rights Impact Assessments in relation to its transformation projects,
where appropriate, and has provided examples of engagement with
user groups leading to changes being made in how services are
delivered. 
54.  Overall, the key messages reflect positively on the council’s
transformation planning and programme management arrangements.  Two
audit improvement recommendations were included in the thematic report
and are replicated in Appendix 1 of this report. This includes details on the
council’s response to the recommendations. We will report on progress
over the term of our audit appointment. 
The council has made good progress with prior year Best
Value recommendations.
55.  As part of our 2024/25 audit work we followed up on the two
outstanding management actions from our 2022/23 work on leadership in
the development of the council’s strategic priorities.  Both have now been
implemented: 
• The plan to refresh the performance dashboard was completed in August
2025 and the performance dashboard has been developed and
published on Sharepoint.  In September 2025 Cabinet approved the re-
use of performance reporting content in other forms to increase
accessibility.  This will support the dashboard finalisation. Publication is
expected by 31st March 2026 (soft launch based on Mid-Year data).
• There is now a dedicated Climate Change webpage, ‘Environment
and Sustainability’ which holds links to all related public information. 
In addition, work is ongoing to include the Improvement Service's
'Scottish Climate Intelligence Service' Climate View Platform by
early 2026.
56.  As part of our 2024/25 audit work, we also followed up on the eight
management actions agreed from our 2023/24 thematic work on workforce
planning.  
57.  We have concluded that good progress has been made on all of the
recommendations and six are fully implemented, including: 
• The Workforce Strategy has been fully updated to align with
internal/external factors, workforce challenges, Council Plan
priorities and other key strategies/plans.  
• An Action Plan aligned to the Workforce Strategy has been agreed
and set up on Pentana.
• The Transformation Board has approved the creation of a Digital
Programme workstream. The intention is that this will allow digital
activities to be monitored against the Council’s Digital Strategy.  
188

Page 189

2. Best Value audit | 28 
• A Digital Skills survey, together with an Agile working wellbeing
survey were conducted during November/December 2024 which
were open to all North Ayrshire Councils employees.  
58.  Further work is still ongoing on the two actions agreed relating to joint
workforce arrangements and development of a performance dashboard to
support workforce planning. These actions are included in Appendix 1 for further
follow up next year. 
The council actively works with partners to identify better
ways of delivering its ambitions for North Ayrshire
59.  There are discussions ongoing across the senior leadership of East
Ayrshire, North Ayrshire and South Ayrshire Councils to explore further
opportunities for public sector reform and collaboration including the Ayrshire
Economic Strategy. These developments as they progress will be subject to
scrutiny by elected members
The delivery of physical regeneration across North
Ayrshire is monitored through the Regeneration Delivery
Plan Action Programme
60.  The Council’s Regeneration Delivery Plan (approved in March 2021)
sets out the Council’s priorities for delivering on the regeneration ambitions
of the Council Plan and Community Wealth Building strategy.  This is to be
achieved working in partnership with others and the communities. A 2025
update was presented to Cabinet in June 2025 and reported on a range of
initiatives. Examples include:
• The council carried out significant work with Transport Scotland and Peel
Ports Group to progress a revised business case for Ardrossan Harbour. 
In February 2025, the Scottish Government announced its intention to
enter negotiations directly with Peel Ports Group to purchase the port. 
The Scottish Government updated the Ardrossan Task Force members on
1 September 2025 to advise that Caledonian Maritime Assets Limited
(CMAL) continue to actively negotiate with Peel Ports Group on the
principles of the ‘Head of Terms’. There has been considerable work on
this by both parties and this is intensifying further over the coming weeks
with a view to finalising the commercial terms of the sale. 
• The 2024/25 round of Participatory Budgeting (PB) concluded in
December 2024, with 15,882 votes cast across Locality and Youth PB
funding rounds. The council’s hybrid approach to participation saw voting
taking place online and in schools, libraries and community group settings
across North Ayrshire, with local people aged 8 and over allocating
£171,377 to 190 community-led projects. 
• The use of Community Asset Transfers (CATs) continues to allow
community groups to increase their capacity and improve local use and
ownership of assets. Between May 2024 and May 2025, sixteen
Expressions of Interest were submitted, ten groups were working on a full
189

Page 190

2. Best Value audit | 29 
application and 2 full applications were received.  Two CATs were
concluded and one was amended from a lease to full ownership to better
meet local needs.
The Ayrshire Growth Deal is a ten year programme of
investment with partners
61.  The Ayrshire Growth Deal (AGD) was signed by the three Ayrshire
Councils and the UK and Scottish Governments in March 2019. The Deal
is a 10 year programme of investment in the Ayrshire economy with the
UK and Scottish Governments contributing £103 million each, with further
funding of £45.5 million from the three councils. The Deal is based around
five programmes and is projected to unlock private investment of at least
£300 million and generate 7,000 jobs.
62.  Delivery of North Ayrshire’s share of the £251 million Growth Deal
programme includes: manufacturing space and a digital hub at i3 in Irvine,
International Marine Science & Environmental Centre at Ardrossan; Centre
for Research into Low Carbon Energy & Circular Economy at Hunterston;
the development of island marina projects and the Great Harbour project
in Irvine.
63.  The AGD Annual Report 2024/25 notes that one of the key challenges
facing AGD is that the delays from previous years have increased the
pressure on the pace toward the successful delivery of the Deal.  The
Report also notes that The Economy and Fair Work Inquiry into City
Region Growth Deals highlights many of the challenges facing the AGD
and that many of the recommendations contained in that report have
resonated with the AGD.
The council is systematically measuring and reporting on
its performance across its strategic priorities. 
64.  The Best Value Revised Statutory Guidance 2020 says that performance
management arrangements should be in place to promote the effective use of
the local authority’s resource, which includes effective performance reporting.
65.  In Our Council Plan 2023-28 the council has listed what it wants to achieve
for each of its four priorities. These are set out in sections headed up ‘We will
know we’re making progress when…’ and includes: 
• There is a sustained decrease in the percentage of children living in poverty. 
• Communities are directly managing and operating more assets and are
allocating community funding to initiatives that are local priorities. 
• Carbon emissions are reducing with a clear pathway to net zero. 
• Lived experience is central in our approach to improving services and
developing policy.
190

Page 191

2. Best Value audit | 30 
66.  The ‘Our Council Plan Performance Management Framework’ was
approved by Cabinet in August 2023. It includes 26 performance indicators
directly linked to the council’s priorities. Ten of these 26 indicators are from the
Local Government Benchmarking Framework (LGBF).  All 26 indicators
included a baseline value and a target for 2024/25. The council has also
identified 33 LGBF indicators that closely link to its priorities within the Council
Plan.
67.  The council reports on its progress against the priorities set out in ‘Our
Council Plan 2023-28’ every six months to Cabinet and subsequently to the
Audit and Scrutiny Committee. The latest six-monthly Council Plan progress
report for the period 1 October 2024 to 31 March 2025 was published in
September 2025. Progress reports include: 
• progress in 26 indicators directly linked to the council’s priorities, set out in its
Performance Management Framework 
• updates on Our Council Plan actions 
• case studies to capture real lived experience 
• contextual information. A locally developed tool, the Inclusive Growth
Dashboard, provides contextual data on trends within North Ayrshire
including indicators such as child poverty rates, employability and area-wide
climate measures 
• progress on the 33 LGBF indicators directly linked to the council’s priorities. 
The council complies with the requirements of the
Statutory Performance Information Direction.
68.  The Accounts Commission issued a new Statutory Performance Information
(SPIs) Direction in December 2021 which applies for the three years from
2022/23. It requires a council to report its: 
• performance in improving local public services (including those provided with
its partners and communities), and progress against agreed desired
outcomes (SPI 1). The Commission expects this reporting to allow
comparison both over time and with other similar bodies (drawing on LGBF
and/or other benchmarking activities).
• own assessment and audit, scrutiny, and inspection body assessments of
how it is performing against its duty of Best Value, and how it has responded
to these assessments (SPI 2). 
69.  The council’s public performance reporting includes: 
• The newly designed Council website was launched in July 2024, and went
fully live in September 2024.  The website home page has been updated to
include a link to the Council plan within the Council Activity section (SPI 1).
191

Page 192

2. Best Value audit | 31 
• Best Value reports, and the council’s updates on its progress in addressing
the recommendations within them, are included on its website along with
inspection body reports (SPI 2). 
• Inspections, audits, awards and accreditations are included in the six monthly
Council Plan Progress Reports with the initial report for the new Council Plan
(Mid-Year 2023-24) approved by Cabinet in January 2024. These reports are
also published on the council’s website (SPI 2). 
• the ‘Our Council Plan Performance Management Framework’ includes 26
performance indicators directly linked to the council’s priorities (SPI 1).
70.  In addition to its own performance reporting, the council presented its
analysis of the national LGBF 2023/24 results to Cabinet in September 2025
and published the result of this on its website.  Further commentary on the
LGBF and the council’s performance in year is at paragraphs 169 to 174. 
71.  In our view, the council’s public performance reporting complies with the
requirements of the Statutory Performance Information Direction. 
192

Page 193

3. Financial management | 32 
3. Financial management
Financial management means having sound budgetary processes, and
the ability to understand the financial environment and whether internal
controls are operating effectively.
Conclusion
Financial management is effective. 
The council reported a service underspend of £17.0 million against its
2024/25 budget and there was a net increase of £3.489 million in the
council’s usable reserves to £129.829 million. There is planned use of
reserves over the medium term to close funding gaps.
A new General Fund Capital Investment Programme 2024/25 to
2033/34 is used to inform capital investment and support Council Plan
priorities. Cost risks have been identified by the council across a number
of projects. 
Long term borrowing levels has increased in support of the council’s
capital programme. The council understands the future revenue
implications of servicing this debt.
Financial systems of internal control were effective and internal audit
provided a reasonable level of assurance over the council’s framework
of governance, risk management and control arrangements. 
The council reported a general fund service underspend of
£17.0 million.
72.  The Council approved a balanced budget for 2024/25 of £427.3 million
in February 2024. The budget included a £5.0 million contribution from
reserves and additional approved savings of £4.2  million.   Budget
adjustments throughout the year resulted in a revised budget for 2024/25
of £455.8 million.   In addition, earmarked funds of £84.9 million were
carried forward from 2023/24 for service expenditure in 2024/25 and were
reflected in the figures within the 2024/25 financial performance reports as
they were drawn down.   
193

Page 194

3. Financial management | 33 
73.   In the 2024/25 Annual Accounts, the council reported a total service
underspend of £17.0 million. Significant variances against budget are
summarised in Exhibit 5,  
Exhibit 5
Summary of significant variances against budget 
Area  £m  Reason for variance 
Underspends     
Employee costs  £3.2
million 
Underspend in relation to vacancy management
across services.  This net overspend is after
overspends for mandatory cover for teacher absence
(£1.952 million) and waste collection staff absences
(£0.693 million).  
Financing costs  £11.2
million 
Underspend includes revision to annual debt
repayment charges under the revised service
concession arrangements of £2.7m and £5.2m from
a planned underspend linked to the treasury and
investment strategy. 
Other corporate items  £4.1
million 
Includes additional Scottish Government Grants not
utilised in year (£2.0m), centrally held provisions in
relation to Storm Eowyn not drawn down by services
(£0.8m) and centrally held inflationary provisions not
drawn down (£0.7m). 
£2.3 
million
Renewable energy and other approved strategic
investments not spent in year. 
Service income and
recharges
£1.3 
million
Higher than anticipated income across services.
Source: North Ayrshire Council 2024/25 Annual Accounts 
74.  There was also an overspend of £1.915 million relating to additional
costs for external residential and non-residential placements for children
and a non-recurring budget transfer of £2.036 million to the IJB, equivalent
to the level of overspend on council services within the HSCP.
The Housing Revenue Account underspent by £1.816
million in 2024/25.
75.    The Housing Revenue Account budgeted for a breakeven position in
2024/25. An underspend of £1.816 million has been reported, mainly due to
savings on loan charges on the HRA Capital Programme.  The accumulated
194

Page 195

3. Financial management | 34 
Housing Revenue Account reserve at 31 March 2025 is £22.141 million, this is
to support delivery of the HRA Business Plan.
There was a £3.489 million increase in usable reserves to
£129.829 million at 31 March 2025.  There is planned use of
reserves over the medium term to mitigate funding gaps.
76.   One of the key measures of the financial health of a council is the level of
reserves held. In 2024/25 there was a net increase of £3.489 million in the
council’s usable reserves, resulting in a total balance of £129.829 million at 31
March 2025 (Exhibit 6).  
77.  The March 2023 CIPFA Bulletin 13 Local Authority Reserves and Balances,
says there is no prescribed level of reserves, but the Proper Officer (the
council’s Head of Service - Finance) has a responsibility to advise members on
the creation and levels of reserves that are appropriate to the council’s
circumstances. Reserves balances can be held for three main purposes: 
• Working balance: To help cushion the impact of uneven cash flows and
avoid unnecessary temporary borrowing. 
• Contingency: To cushion the impact of unexpected events or
emergencies. 
• Known requirements: To build up funds to meet known or predicted
requirements
Exhibit 6
North Ayrshire Council – usable reserves 
Reserve  31 March 2023 
£ million 
31 March 2024
£ million 
31 March 2025 
£ million 
General fund   £110.115  £93.385  £94.269 
Housing revenue account  £13.685  £20.566  £22.141 
Insurance fund  £2.998  £2.558  £2.233 
Capital fund  £8.882  £9.831  £11.186 
Total usable reserves   £135.680  £126.340  £129.829 
Source: North Ayrshire Council Annual Accounts 2022/23 to 2024/25
78.  Within the general fund reserve the most significant movements were: 
• Planned use of £15.8 million for earmarked spend agreed through decisions
taken by members during the year, including £6.5 million to support
expansion of Early Learning provision and Education recovery, £3.8 million to
support delivery of the Council's Renewal and Recovery Strategy, and £5.0
million to support the 2024/25 budget.   
195

Page 196

3. Financial management | 35 
• Increase of £19.1 million mainly due to planned contributions of £11.2 million
to the Loans Fund Reserve and £4.1 million relating to specific projects in
2025/26 and beyond.   
79.   At 31 March 2025, the general fund reserve includes an unearmarked
balance of £9.2 million, representing 2% of the expenditure budget for
2024/2025. Management considers that this level of reserve reflects a
suitable contingency to contribute towards any unanticipated pressures
and is consistent with, although at the lower end of, the council’s approved
strategy of maintaining unearmarked reserves between 2 and 4 per cent of
net expenditure to meet the potential cost of unforeseen liabilities. 
80.  The earmarked general fund reserve of £85.1 million includes an
earmarked Prudential Investment Fund (Loans Fund Reserve) of £38.0
million which supports borrowing linked to the council’s Capital Investment
Programme.  It was created as part of the 2015/16 budget strategy to
utilise short term underspends on General Fund financing budgets to
offset longer term pressures to support Prudential Borrowing arising from
the Capital Investment Programme.  Due to the significant investment
planned by the council over the period to 2033/34, the current General
Fund financing budgets will be incrementally increased over the period of
the programme.  This additional funding includes the use of the recurring
element of the Service Concession flexibility approved at Council on 15
February 2023 (which resulted in an average contribution of £3.4 million
from 2022/23) and the utilisation of the balance of savings from the
temporary reduction in the Strathclyde Pension Fund employers’
superannuation contributions during 2024/25 and 2025/26 totalling £8.5
million.  Delivery of the council’s Capital Investment Programme is
discussed further at paragraphs 83 to 89.
81.  The remainder of the General Fund Reserve, £47.1 million, is
earmarked for specific purposes such as the supporting the council’s
renewal and recovery strategy (£5.2 million) and supporting the medium-
term financial planning strategy (£9.3 million).  
82.   The level of reserves has enabled the council to deliver medium to
long-term strategies, fund one-off costs and smooth its core revenue
budget requirement.  However the Head of Service (Finance)
acknowledges that delivering balanced Budgets over the medium-term will
be very challenging and will require a range of approaches, including
reduced investment in services, further service reform / re-design, income
generation, efficiencies from the Sustainable Change Programme, use of
council reserves and a level of Council Tax increase that balances inflation
against the impact on citizens.     
196

Page 197

3. Financial management | 36 
A new General Fund Capital Investment Programme
2024/25 to 2033/34 is used to inform capital investment and
support Council Plan priorities.
83.  In February 2024 the Council approved a revised the Capital
Investment Programme 2024/25 to 2033/34.   The review considered the
current Capital Investment Programme and cognisance of subsequent
changes, including: 
• The ongoing impact of construction industry inflation, cost volatility and
supply chain issues across the overall Capital Investment Programme; 
• Reductions in Scottish Government capital grants as detailed in the Local
Government Finance Settlement 2024/25; 
• A review of spending profiles across key capital projects to support the
Council’s priorities; and 
• Revised levels of investment across projects, taking cognisance of
Council priorities, external funding sources and investing in core assets
through asset management plans.
84.  The review included an assessment of all funding sources over the 10
years of the plan, including assumed levels of general capital grant,
specific grants and an assessment of the level of capital receipts over the
period. The capital programme, is expected to deliver a total programme of
£406.459m to 2033/34. Total available funding has been projected at
£189.987m. The balance of funding required to deliver the capital
programme will be met through prudential borrowing and is anticipated at
£216.472m. 
85.  In both 2022/23 and 2023/24 we reported that there was scope for the
council to improve its forecasting of capital projects and more accurately
plan expenditure, recognising the extent of optimism bias that appears to
have existed. Officers have confirmed that in response to our
recommendation, the phasing of expenditure within the approved Capital
Investment Programme for 2024/25 to 2033/34 was reviewed to reflect
historic expenditure patterns and organisational capacity. This has resulted
in the rephasing of approximately 19% of the planned expenditure in both
2024/25 and 2025/26 for delivery in later years, without impacting on the
overall value of investment within the programme. 
86.  Both capital and revenue financial resources across the General Fund
and Housing Revenue Account are used to maintain the current asset
base. The Council’s Capital Investment Strategy has been developed in
line with the requirements of the Prudential Code and brings together the
various asset management plans and strategies across the Council,
aligning investment plans with these strategies and with  strategic
priorities.  Individual asset management plans are then updated on an
annual basis.
197

Page 198

3. Financial management | 37 
87.  The capital programme is reviewed by Cabinet on an on-going basis
with any additional funding brought forward for approval as appropriate.
Major reviews are undertaken on a 3-year basis, with the next due to be
completed during 2026/27.
88.  The council’s asset management plans include details of lifecycle
investment costs required to maintain assets and infrastructure to an
appropriate standard that supports service delivery.  Progress is reported
to Cabinet on a bi-annual basis.  The council has classified its assets into
six categories: Open Space; Property; Fleet, Plant and Equipment ;
Roads, Structures and Lighting;  ICT; and Housing.
89.   Due to the significant investment planned by North Ayrshire Council
over the period to 2033/34, it is projected that the Prudential Investment
Fund will be exhausted before the end of the current 10 year Capital
Investment Programme. The council acknowledge that in order to ensure
the affordability of current and future capital investments beyond this, it will
be necessary to incrementally increase the current General Fund financing
budgets over the period of the programme.  A review of these budgets was
undertaken in February 2024 as part of the General Services Revenue
Estimates 2024/25 to 2026/27, to support the delivery of the Capital
Investment Programme.  An incremental contribution of £0.250 million per
annum from 2024/25, increasing to £0.450 million from 2025/26 and
£0.500 million per annum from 2026/27 was approved.  In February 2025
a further incremental contribution of £0.025 million per annum from
2026/27 was approved. 
Approximately 19% of planned capital expenditure in both 2024/25 and
2025/26 has been rephased for delivery in later years. 
90.  The General Services (GS) Capital Investment Programme included a
budget of £118.728 million for 2024/25.  The Housing Revenue Account
(HRA) Capital Investment Programme included a budget of £52.011 million
for 2024/25.  
91.  The final outturn report for GS is an underspend of £0.4 million against
a revised budget of £91.379 million, as shown in Exhibit 7 below. The final
outturn position for the HRA is an underspend of £2.897m against a
revised budget of £41.863m. 
198

Page 199

3. Financial management | 38 
Exhibit 7
North Ayrshire Council – capital expenditure to 31 March 2025 
Source: North Ayrshire Council 
There continue to be challenges in the construction
industry that may impact on the council’s capital
programmes.
92.  Areas of cost risk have been identified by the council across a number
of projects. These risks are linked to a number of factors, including cost
volatility linked to inflationary pressures; limited availability of contractors,
supply chain issues and material shortages which are impacting on tender
returns and the cost of materials; delays resulting from interaction with
external agencies and regulators; and other contract management issues
across a number of projects. 
93.  Specific projects where cost risks have been identified or are
anticipated, include Ardrossan North Shore development, incorporating the
new campus which will deliver primary, secondary, and early years
provision as well as community use sport, theatre and leisure facilities.
Some mitigation has been built into the capital programmes in the form of
flexibility budgets, totalling £25 million over the next few years, although it
199

Page 200

3. Financial management | 39 
is recognised that cost pressures may exceed this provision. Officers have
confirmed that these risks will be quantified as individual projects are
completed and tendering exercises are finalised, with the impact on the
costs of the programme being monitored and reported to Cabinet as
appropriate. 
94.  Total capital investment of £331.483 million from the Council’s General
Fund is planned over the period from 2025/26 to 2033/34 and £375.868
million from the HRA is planned over the period from 2025/26 to 2034/35,
supporting the four key strategic priorities from the Council Plan.  This
includes planned expenditure of £64.0 million towards the Ayrshire Growth
Deal (AGD) to 2029/30.  The total level of AGD investment across Ayrshire
will be in the region of £251.5m (including £103m commitments from both
the UK and Scottish Governments).
95.  The GF Capital Plan includes £111.7 million planned investment in
Education. This includes:
• £86.8 million for the Ardrossan Campus (see paragraph 96); and 
• £6.5 million relating to Universal school meals expansion;
• £7.5 million relating to schools ICT investment.
Other major projects include Roads Improvement/Reconstruction (£34.3
million) and B714 Improvements ((£27.0 million).  
96.  In a report to Council in June 2025, cost pressures were reported
throughout the Ardrossan Campus project which has  resulted in a
projected final cost for the Ardrossan Campus of £114.6 million which is
£27.8 million (32%) above the initial budget allocation of £86.8 million.  In
particular, a review of project costs identified a significant gap between the
cost plans prepared prior to market testing and the actual plans.  Action
taken to reduce cost pressures in the project included a move away from
the Passivhaus building standard under which the buildings’ fabric is
superior to most current building standards, to deliver potential energy
savings year after year.  We are told this is a change that has been made
by a number of councils.  
97.  The Council approved the additional budget provision of £27.8 million
to be funded through £4 million additional awarded by Scottish Futures
Trust, a re-direction of £7.8 million from existing capital flexibility and
additional borrowing of up to £16 million, at an annual revenue cost of
£0.912 million per annum.
98.  The HRA Capital Investment Plan supports the delivery of 1,641 new
homes by 2029 and planned buybacks of 65 units over the next five years,
as well as £184.847 million of improvements to existing stock.
200

Page 201

3. Financial management | 40 
Roads backlog maintenance stands at £38.5 million with a
‘steady state’ requirement for maintaining the roads at
present condition of £5.5 million per year.
99.  North Ayrshire Council’s roads are the council’s largest community
asset.   The estimated carriageway maintenance backlog figure for North
Ayrshire is currently £38.5m. The latest 2025 Road Condition Indicator
(RCI) for the council is 30.6, which signifies that 30.6% of roads should be
considered for treatment.  This shows a 1.9% positive shift when
compared to the 2024 figure of 32.5%.
100.  The ‘steady state’ figure for maintaining the roads at present
condition is £5.5m per year. The capital budget supported by revenue
funding is £4.3 million for 2025/26. At the Council’s budget setting meeting
on 26 February 2025 a further £1.0 million was allocated to road
maintenance providing a total budget for 2025/26 of £5.3 million.  
101.  The capital programme for the period 2026/27 to 2033/34 details that
£3.8m of capital investment is planned annually on roads
improvement/reconstruction.   Additional revenue funding will reduce the
gap between investment and the ‘steady state’ figure and counter
inflationary increases in contractor and material costs. However, it does
not contribute towards the challenge of backlog maintenance of £38.5
million.
102.  The average annual budget calculated in the models for each
authority, to maintain ‘steady state’, excludes any allowance for inflation or
discount levels over the next ten-year period. It also excludes the
additional costs associated with surfacing works on Arran.   The council
acknowledge that if does not maintain the above steady state expenditure
over the next ten years for carriageway surfacing, then the carriageway
asset will deteriorate, resulting in an increase in the overall network RCI.
Long term borrowing has increased by 64% in support of
the council’s capital programme. 
103.  A greater reliance on borrowing to fund capital programmes
increases the pressures on revenue budgets over the longer term.  At 31
March 2025, long term borrowing stood at £377.608 million, an increase of
£123.192 million (64%) on the 2024 level of £254.416 million. During the
same period, short-term borrowing  decreased from £65.151 million to
£54.451 million, a decrease of £10.7 million. The reduction reflects the
scheduled repayments of debt which matured during the financial year. 
201

Page 202

3. Financial management | 41 
Total external debt which includes the council’s long-term
liabilities, was within the authorised limit and operational
boundary set by the council’s treasury management and
investment strategy.  
104.  The council remained within its authorised capital financing
requirement (CFR) of £541.275 million, with gross external debt being
£469.138 million. This is lower than the CFR as the Council continues with
its strategy to use internal funds. The ratio of net revenue used for paying
for the borrowing finance cost (loan interest) was 23.4 per cent for housing
and 3.0 per cent for non-housing. This is an indicator of affordability and
highlights the revenue implications of existing and proposed capital
expenditure by identifying the proportion of the revenue budget required to
meet borrowing costs. 
105.   The national average ratio of financing costs to net revenue stream
in 2023/24 was 23.8 per cent for housing and 5.8 per cent for non-
housing. North Ayrshire Council are performing well with the non-housing
ratio being around 3 per cent lower than the Scottish average. The rising
ratio within the HRA is indicative of the significant capital investment
programme as outlined in the Strategic Housing Investment Plan.
106.  The Treasury Management Strategy for 2025/26 sets out  that the
borrowing needs to support delivery of the capital programme will increase
to £821.544m by 2030/31 and then reduce annually to 2033/34. This could
present a risk to the council because if interest rates were to increase
again or remain elevated for an extended period, a higher proportion of
revenue spend would be spent on paying interest costs. 
107.  The council acknowledge this, and it is anticipated that if there is a
significant risk of a sharp rise in long and short-term rates than currently
forecast, then the portfolio position will be re-appraised with the likely
action that fixed rate funding will be drawn whilst interest rates are still
lower than they are expected to be in the next few years.
108.  The council continues to manage its borrowing through its treasury
management and investment strategy.  Updates on the investment
position of the Council are reported to Cabinet in the Mid-Year Treasury
Report and the Annual Treasury Report is submitted to the Council after
the end of the financial year. 
There are well-established budget monitoring and reporting
processes in place.
109.  The council has effective financial management processes in place
to manage budgets and support the sustainability of services in the
medium-term. This is supported by an experienced finance team and the
processes in place allow members to carry out effective scrutiny of the
council’s finances. 
202

Page 203

3. Financial management | 42 
110.  The Cabinet regularly review progress against budget throughout the
year. The budget updates provide a good level of information on the
reasons for variances, the projected financial outturn and the challenges
facing the council for the rest of the year. The information is provided at
timely intervals throughout the year to enable effective scrutiny from
members. 
Key financial information overtime shows how the council
has managed its financial pressures effectively to date 
111.  Exhibit 8 shows how the council has managed its financial pressures
to date
Exhibit 8
Key financial information 
Budget setting
2022/23
(£m)
2023/24
(£m)
2024/25
(£m)
Planned
2025/26
(£m)
Budget gap  12.315 19.267 22.574 18.867
Planned to be met via:     
Savings and flexibilities -9.876 -12.448 -17.562 -8.539
Use of reserves 0.000 -3.410 -5.000 -4.000
Additional council tax / funding -2.439 -3.409 -0.012 -6.328
Actual
Savings delivered* -9.876 -12.448 -17.562 -8.539
Reserves 
Use of / (contribution to) reserves 0.000 -3.410 -5.000 -4.000
Total usable reserves carried
forward  135.680 126.340 129.829 
General Fund:    
Earmarked  102.062 84.940 85.088 
Uncommitted  8.053 8.445 9.181 
Source: North Ayrshire Council’s  annual accounts and Council Revenue
Plans
203

Page 204

3. Financial management | 43 
*savings delivered equals savings planned because amounts are top-sliced from departmental
budgets
Financial systems of internal control were effective.
112.   From our review of the design and implementation of systems of
internal control (including those relating to IT) relevant to our audit
approach, we have not identified any issues that represent a risk of
material misstatement for the 2024/25 Annual Accounts.  
113.   The key controls within the council’s main financial systems were
assessed as being designed and implemented appropriately.  As such, we
are satisfied that the risk of material misstatement to the Annual Accounts
is low. 
Internal audit provided a reasonable level of assurance
over the council’s framework of governance, risk
management and control arrangements during 2024/25.
114.  The internal audit service provides members and management with
independent assurance on risk management, internal control and
corporate governance processes as well as providing a deterrent effect to
potential fraud.
115.  The internal audit plan was approved by the Audit and Scrutiny
Committee in March 2024 with a mid-year change to the plan approved in
October 2024.  The mid-year revised plan included 17 assignments where
an audit output was anticipated with a further 3 unplanned investigations
undertaken during the year. At the end of May 2025, 10 of these
assignments had been completed, 2 were at draft report stage, 7 were
currently work in progress and one had not yet started. The results of the
draft reports and work in progress assignments will be reported to a future
meeting of the Audit and Scrutiny Committee.
116.  Internal audit’s annual report, presented to the May 2025 Audit and
Scrutiny Committee, concluded that reasonable assurance can be placed
over the framework of governance, risk management and control and that
adequate controls were in place and were operating throughout the
Council in 2024/25
117.  All audit reports finalised during 2024/25 were reported to meetings
of the Audit and Scrutiny Committee. The outcomes from the audit work
during the year provided mostly substantial and reasonable assurance
opinions however five resulted in a limited assurance opinion. These
related to:
• Education Leavers and Movers – A number of findings were
identified including a lack of formal notification procedures, forms
not being completed in full and/or on time and a lack of routine
204

Page 205

3. Financial management | 44 
reviews by school management to identify staff who had left or
moved.
• Missing Laptops – A review of the arrangements surrounding the
delivery and deployment of devices to Lockhart, in August 2021,
identified that standard receipting and deployment processes were
not adhered to at the time and supporting documentation was no
longer available due to staff leaving and a change in the IT case
management system. Some devices remain unaccounted for. 
• Accounts Payable Transaction Testing – Invoice testing identified
that a certificate of payment for £3.7 million for a large capital
project was paid twice in error and subsequently corrected following
notification from the contractor. The review also identified a further
41 potential duplicate invoices totalling £123,282.71 which had not
already been identified. The Accounts Payable team have reviewed
the potential duplicates and confirmed the value of actual duplicates
was £60,294.75 which they are in the process of recovering.
• Community Associations – An audit of the arrangements for
ensuring that community associations (CA) were complying with the
terms of their SLAs, identified that there was no formal process for
monitoring compliance with SLAs and evidence of compliance was
not always retained by the Council. 
• HSCP Online Bank Account – The audit identified that purchases
had been made from the account that did not adhere to the
Council’s procurement processes, the records held for the bank
account were incomplete and staff responsible for the management
of the account had not completed financial training.  The account
was held outwith the Council’s corporate bank accounts.
118.  A number of actions have been agreed to address these issues.
119.  In line with the Public Sector Internal Audit Standards (PSIAS) there
is a requirement for the internal audit function to be independently
reviewed once every five-years. We reported in 2022/23 that the review of
the Council's Internal Audit team was completed by West Dunbartonshire
Council and was reported to the Audit and Scrutiny Committee in
September 2022. Overall, the assessor was able to provide substantial
assurance that the Council's Internal Audit team complies with the
requirements of the PSIAS.  
The council has in place appropriate arrangements for the
prevention and detection of fraud and corruption. 
120.  The council has a range of established procedures for preventing
and detecting fraud and irregularity including counter fraud and corruption
strategy, whistleblowing policy and procedures, and codes of conduct for
members and officers. 
205

Page 206

3. Financial management | 45 
121.  A Corporate Fraud Team provides the Council with the capacity to
investigate fraud both within and against the organisation. The team
received 331 referrals for investigation during 2024/25 (2023/24: 398
referrals). All referrals made to the team are investigated.  359 cases were
closed during 2024/25 (2023/24: 385 cases) with results achieved (fraud,
error or other recovery/action) in 113 cases. Fraud and error totalling
£0.057 million was identified. 
122.   The council continues to participate in the National Fraud Initiative
(NFI). This is a counter-fraud exercise across the UK public sector which
aims to prevent and detect fraud. The latest data sets were submitted to
the Cabinet Office in October 2024, with initial matches released in
December 2024. Further releases have occurred since December and
more are expected throughout 2025. This information has been
disseminated to the appropriate teams across the council for investigation
as matches are released.  Data was uploaded in support of the ReCheck
exercise in January 2025, with matches released back to the Council in
January 2025 and again in March 2025.   
123.   We have concluded that the council has in place appropriate
arrangements for the prevention and detection of fraud and other
irregularities. We are not aware of any specific issues that we need to
bring to your attention. 
206

Page 207

4. Financial sustainability | 46 
4. Financial sustainability
Financial Sustainability means being able to meet the needs of the
present without compromising the ability of future generations to meet
their own needs.
Conclusion
The council approved a balanced budget for 2025/26, which included a
council tax increase of seven per cent (£5.0m) and the use of £4.0
million of reserves, non-recurring savings of £9.5 million from reduced
pension contributions and further savings of £4.8 million across
Directorates. An extensive programme of engagement and consultation
with communities was undertaken that helped shape the 2025/26
budget.
Significant risks exist to achieving financial balance in 2025/26.  These
include pay awards in excess of the budgeted contribution and the
financial challenges facing the IJB. 
The latest MTFO which covers the three-year period to 2027/28 has
identified a structural funding gap of £46.7 million. The underlying
service cost base is not sustainable and reserves will be depleted over
the longer term unless future recurring savings are made through
transformation of services, service reduction, service withdrawal and
income generation.   
In 2024/25 the council released 85 staff which delivered approximately
£2.5 million recurring savings. A further 45 staff reductions are
anticipated in 2025/26. 
Discussions are also currently ongoing on how efficiencies could be
realised through delivering council services differently in partnership with
others. Elected members will need to make difficult decisions on how
the use of resources is prioritised going forward, within its recurring
funding.  
High absence rates continue to be reported in areas which require cover
arrangements, specifically teachers and waste collection incurring
additional costs of £2.6 million.
207

Page 208

4. Financial sustainability | 47 
The council approved a balanced budget for 2025/26.  To
achieve this there council tax was increased by seven per
cent (£5.0m) and the use of £4.0 million of reserves was
approved. Non-recurring savings of £9.5 million from
reduced pension contributions and savings of £4.8 million
across directorates were also required. 
124.  . The council, alongside other local authorities, is navigating
substantial fiscal pressures that are projected to widen budget gaps in the
coming years. In its January 2025, Local Government in Scotland
Financial Bulletin 2023/24, the Accounts Commission noted that:
• In 2023/24, councils’ total revenue and income fell, including another real
terms decrease in revenue funding from the Scottish Government; 
• In 2023/24, capital funding remained constrained, with councils borrowing
more and managing a range of complex funding models; 
• In 2023/24, usable reserves, which are those that can be used to support
service delivery, reduced and most are already committed for specific
purposes; and 
• Councils need to intensify transformation activity, progressing at scale and
pace to ensure their financial sustainability. 
125.  In its May 2025 Local government budgets 2025/26 briefing, the
Accounts Commission commented that councils must cover a budget
shortfall of £647 million in 2025/26 and that whilst councils have partly met
this shortfall through service savings and increased charges for services,
continuing to use reserves and make one-off savings isn’t sustainable. The
Accounts Commission also commented that longer-term change in the
way services are delivered is happening but must accelerate.
126.  Against this increasingly challenging financial environment, the
Council were presented in February 2025 with a balanced budget for
2025/26 of £459.065 million.  To achieve this there council tax was
increased by seven per cent (£5.0m) and the use of £4.0 million of
reserves was approved. Non-recurring savings of £9.5 million from
reduced pension contributions and further savings of £4.8 million across
Directorates were also required. Total funding also includes an annual
uplift of 5% to fees and charges.
127.  Directorate savings of £4.8 million are required in 2025/26.  In
addition to £2.254 million savings which had already been built into the
budget, the excess of expenditure over funding produced a further savings
requirement of £2.547 million for 2025/26.  Ten savings proposals were
included in the budget papers for members approval to deliver a balanced
budget. New savings proposed included realignment of teaching
resources of  £1.174 million relating to a reduction in teacher numbers of
208

Page 209

4. Financial sustainability | 48 
28.0 FTE, £0.305 million from a review of KA Leisure and £0.211 million
from a 5% increase in fees and charges (excluding school meals). 
128.  North Ayrshire Council's anticipated Scottish Government funding
support, as distributed, for 2025/26 is £375.310 million.  The Local
Government Settlement resulted in an increase of £7.254 million in core
grant funding (2.05%) when compared to the 2024/25 settlement. The
Settlement did not include any funding to support the increase in employer
national insurance contributions that came into effect from April 2025. For
the council the total cost of this policy change in relation to direct staff is
£6.618 million (including the HSCP).
129.  Council Tax income represents around 16% of the council’s funding.
The MTFP includes an increase of 7% in Council Tax in 2025/26, with a
further 5% increase planned for 2026/27 and 2027/28.  Councils have the
power to vary the Council Tax charge for second homes from the current
100% charge, to include a premium of up to a further 100% of the
applicable Council Tax charge. Following a period of consultation during
2024/25, North Ayrshire Council at its meeting on 12 February 2025
approved the application of the 100% premium.  The council has
approximately 1500 second homes, almost all of which are on Arran and
Cumbrae.
There are risks exist to the council achieving the 2025/26
budget. 
130.  There are a number of significant financial risks that the council is
managing for 2025/26. The first relates to the risk of the 2025/26 pay
award being agreed at a level in excess of the budgeted 3% contribution.
This has now been settled at 4% for 2025/26 (excluding Teachers who
have not yet settled).  Without any further Scottish Government support
this will  have a material impact on the council’s finances.
131.  The second risk relates to the IJB’s ability to address budget
pressures through the delivery of equivalent savings and with the use of
any available reserves.  The council provided additional financial support
to the IJB of £2.036 million in 2024/25 equivalent to the level of overspend
on Council services.  At 31 March 2025, the IJB held no unearmarked
reserves and £3.2 million of earmarked reserves which are anticipated to
be drawn down during 2025/26. The IJB set a balanced budget for
2025/26 on 20 March 2025. This did not include any draw on reserves but
did include the approval of £4.019 million of savings to achieve financial
balance. 
132.  The position reported to Cabinet in August 2025 indicates that the
IJB project an overspend of £5.187 million (1.5%) on council services in
2025/26, reduced to £1.175 million through identified financial recovery
actions.  A Finance Working Group which includes the council’s Head of
Service (Finance), meets monthly to facilitate increased oversight and
scrutiny of the financial position and transformation programme.   The
209

Page 210

4. Financial sustainability | 49 
current planning assumption for years 2026/27 and 2027/28 from the
Council is that the financial pressures facing the IJB will be met by savings
and recovery actions. 
The council’s latest medium-term financial outlook (MTFO)
which covers the three-year period to 2027/28 has identified a
structural funding gap of £46.7 million (including the HSCP). 
133.  The council has well-established processes for setting and
monitoring budgets. Its General Fund Long Term Financial Outlook (LTFO)
is central to the Council’s strategic financial framework and establishes a
sound basis for the development of the Medium-Term Financial Outlook
(MTFO) and subsequent annual budgets, enabling the Council to address
the challenges it faces and align resources to key priorities in the Council
Plan. The LTFO ensures that strategic initiatives which require long-term
revenue and capital commitments are properly incorporated into the
financial planning process. 
134.  The latest LTFO 2024/25 to 2033/34 was presented to the Council in
December 2023 and identifies an estimated funding shortfall of £127
million over the next ten years which the Council requires to address. This
includes anticipated pressures in relation to the HSCP and is based on
best estimates with sensitivity analyses highlighting the implications of
changes to the underlying assumptions.  While the council currently has
reserves to support it’s fundings gaps , the reserves can only be spent
once.  The cost base is not sustainable and there is a risk to the longer
term financial sustainability of council services.
135.  The latest MTFO for the period 2025/26 to 2027/27 was presented to
the Council in October 2024, draws on the same data and projections as
the LTFO and has identified a number of specific financial challenges in
relation to the availability of Scottish Government funding for local
authorities, the impact that anticipated demographic profile and other
demand and cost pressures will have on the Council’s cost base, and the
strategies available to address the resultant funding gap. This has
identified a structural funding gap of £46.7 million (including the HSCP)
which must be addressed as part of the Council’s Medium-Term Financial
Plan. Given the current financial landscape, future savings must be made
through the urgent transformation of services to bridge this gap.
136.  Key assumptions within the MTFO include:
• Workforce costs - The current planning assumption across the medium
and long-term is for the Council funding element of pay awards to remain
at a 3% increase each year. Also included is the planned decrease to
Strathclyde Pension Fund contribution rates from 19.3% to 6.5% for
2025/26 before increasing to 17.5% from 2026/27.
• Local Government Funding - The LTFO forecast includes a flat cash
funding projection over the duration of the next 2 years followed by funding
210

Page 211

4. Financial sustainability | 50 
reductions from 2027/28 as the impact of the declining North Ayrshire
population demographic reduces the proportionate share of national
resources.  For 2025/26 Council tax was projected at a 5% increase
(actual 7%) and 3% for 2026/27 and 2027/28. 
• Reserves - Approved reserves to support the budgets are £4 million in
2025/25, £3.5 million in 2026/27 and £2.8 million in 2027/28.  
137.  The anticipated funding gap position of the Council (including the
HSCP) over the period is provided in Exhibit 9 below. This does not
incorporate any planned use of reserves noted above. 
Exhibit 9
MTFO - budget gap 2025/26 - 2027/28 
2025/26
£’million
2026/27
£’million
2027/28
£’million
Total gap
£’million
General Fund
Gross Funding
gap
13.2 7.4 7.9 28.5
HSCP Pressures 5.4 6.4 6.4 18.2
Total 18.6 13.8 14.3 46.7 
Source: North Ayrshire Council 
• HSCP: Information on anticipated pressures and proposed savings options are shared
with North Ayrshire Council to inform the allocation of resources delegated to the IJB. The
level of contribution to the HSCP is based on an anticipated “flat cash” planning
assumption where the HSCP address budget pressures through the delivery of equivalent
savings and with the use of any available reserves. The HSCP have identified financial
pressures of £18.2 million over the next 3 years. 
138.  An updated MTFO is expected to be presented to the Council in
December 2025 following confirmation of the Scottish Budget for 2026/27
and the Local Government settlement.  
An extensive programme of engagement and consultation
with communities was undertaken as part of the 2025/26
budget process that set out the scale of the financial
challenge facing the council.
139.  Before the Council considered the range of budget proposals and the
level of Council tax for 2025/26, an extensive programme of engagement
211

Page 212

4. Financial sustainability | 51 
and consultation with communities was undertaken that set out the scale
of the financial challenge facing the council. The engagement ran from 10
October 2024 to 21 November 2024 and included surveys across six main
themes as well as in person and online focus groups.  The six main
themes each included a number of proposals which included:
• Realign the level of teaching resource across North Ayrshire schools (£2.0
million saving each year)
• Review of School Crossing Patrollers (£0.3 million saving in 2025/26)
• Apply a 100% Council Tax Premium on Second Homes (£1.5 million
additional revenue in 2025/26)
• Increase in the level of Council Tax (the consultation sets out the annual
Council tax bill based on increases from 1% to 10% with additional
revenue of £0.6 million to £6.5 million) 
140.  The programme resulted in 4,461 responses across the six themes,
with more detailed feedback on proposals and engagement with
community groups across North Ayrshire.  The engagement has also
enabled residents to bring petitions on specific options to the Audit and
Scrutiny Committee and Cabinet.  Full details of feedback across all areas
were presented to the Council on 12 February 2025, for elected member
consideration in advance of setting the Council Budget on 26 February
2025.
The Transformation Board provides the strategic
integration and ownership of the council's transformation
plans.  
141.  Our May 2025 Best Value thematic report outlined at Section 2,
identifies that good progress continues to be made in developing the
Sustainable Change Programme and that financial efficiencies generated
from the programme will help address budget gaps over the medium-term.
The Transformation Board continues to look for new projects that have the
potential to deliver a material financial benefit to the council. The current
workstreams include: 
• Use of Land and Property Assets including commercial and non-
commercial property - This includes a major operational property review
within the Irvine locality and a programme to maximise all commercial
property revenue;
• Transport and Travel and decarbonisation of the Council fleet;
• Sustainability initiatives including major solar renewable energy
investment in Nethermains and Shewalton;
212

Page 213

4. Financial sustainability | 52 
• Digital Initiatives – Including Accessing Our Council and Financial
Inclusion services, maximising digital opportunities around support and
contact; and
• A range of Service reviews including Waste Services, Housing Services,
Learning resources, Additional support needs, Economic Development,
Growth and Regeneration and the Brighter Pathways programme led by
the HSCP which looks at high cost external residential placements for
children and considers alternative settings of care to deliver better
outcomes and reduce cost. 
142.  Officers are clear however that future recurring savings will not be
sufficient from transformation.  National initiatives through the
Improvement Service and Digital Office could also provide further
opportunities for councils to take a collective approach to areas of service
delivery but these are at an early stage. The Council also continues to
explore opportunities for delivering services working with partners.  This is
discussed further in the Best Value section of the report.  
In 2025/26 the workforce is projected to reduce by 45.2
FTE’s.
144. During 2024/25 the Council continued to progress a Voluntary Early Release (VER)
programme. This process has considered the scale of the financial challenges and an
assessment of the impact on service delivery and associated costs of exit for those staff who
have volunteered for consideration. A total of 85 staff were released by 31 March 2025 which
delivered approximately £2.5 million recurring savings. 
145. At 1 April 2025, North Ayrshire Council employed 7,621 staff, equivalent to 6,451 FTE
posts.   Anticipated workforce implications associated with the MTFP are summarised in Exhibit
10 below. 
Exhibit 10
MTFP – anticipated workforce implications 2024/25 – 2027/28 
Category 2025/26
FTE 2026/27 FTE 2027/28
FTE
Operational budget adjustment (8.0) (5.0) -
Previously approved savings (0.7) - -
Pressures and growth 6.0 - -
New savings options (42.5) (2.3) --
Total workforce implications (45.2) (7.3) 
Source: North Ayrshire Council 
146. In 2025/26 the workforce is projected to reduce by 45.2 FTE’s. The
reduction will be managed through natural attrition, vacancy management,
213

Page 214

4. Financial sustainability | 53 
through the Vacancy Scrutiny Panel, redeployment and, where
appropriate, voluntary early release.
High absence rates continue to be reported in areas which
require staff cover arrangements, specifically teachers and
waste collection.  In 2024/25 this resulted in additional
costs of £2.6 million.
147. In 2024/25, the average days lost through sickness increased, per
FTE to 12.76 days (10.82 days in 2023/24).  This is above the council’s
target rate of 10.47 days.  High absence rates continue to be reported in
areas which require cover arrangements, specifically teachers (costing
£1.952 million) and waste collection (costing £0.693 million). Waste
Services report cumulative sickness absence rate of 30.42 days per
employee from April 2024 to March 2025.  Overtime costs of £1.05 million
were incurred by the HSCP to provide absence cover requirements.  
148.  Officers have confirmed that during 2024/25, increased emphasis
has been managing sickness absence through improved data recording
and reporting, increasing monitoring and re-education of managers.  They
have highlighted:  
• 64% of Services/Sections either met their absence target or improved their
days lost per FTE from 2023/24;  
• The Council absence position improved at Q4 2024/25 compared to Q4
2023/24;   
• There was a reduction in the number of long term absence cases in 2025
compared to 2024;  
• A higher percentage of the workforce had no absence up to Q4 2024/25
compared to the previous year;   
• The Council has the joint 4th lowest level of absence for both the Teaching
and Non-Teaching categories within their Local Government
Benchmarking Framework family group 2023/24. Additionally, the
Council’s figure is lower than the Scotland overall absence figure in the
Non-Teaching category; and 
• High levels of engagement have been experienced with attendance at the
HR absence sessions for line managers.  
149.  A dedicated resource has been recruited to monitor and review the
absence management process in waste management.  The absence rates
reflect an improving position, however they are still above target rates.
Resources out-with waste collections have received HGV training to help
provide cover for collections. An overall review of the waste service in light
of legislative changes and current service demands is ongoing. 
214

Page 215

5. Vision, leadership and governance | 54 
5. Vision, leadership and
governance
Public sector bodies must have a clear vision and strategy and set
priorities for improvement within this vision and strategy. They work
together with partners and communities to improve outcomes and foster
a culture of innovation.
Conclusion
There is openness and transparency within the council together with
appropriate governance and decision-making arrangements.
There are appropriate governance and decision-making arrangements
in place at the council.
The council offers a training programme for members in addition to e-
learning and the opportunity to attend Improvement Service events and
webinars.
Partners should review the range of Ayrshire Growth Deal papers
considered ‘in private’.
There is openness and transparency in decision-making by
the council. 
150.  The council has implemented several measures to ensure that the
decision-making processes are accessible to the public. These include the
live streaming of meetings and the publication of meeting agendas,
papers, and video recordings on the council website.
151.  The council publishes its Annual Accounts on its website, which
include a Management Commentary. This commentary provides an
analysis of the council’s financial performance and use of resources for the
year. The Council has approved and adopted a Local Code of Corporate
Governance which is consistent with the principles of the CIPFA/SOLACE
Framework ‘Delivering Good Governance in Local Government’ (2016). 
The Annual Governance Statement is approved annually by the Audit and
Scrutiny Committee and published on the council’s website.
215

Page 216

5. Vision, leadership and governance | 55 
152.  The council website also provides the public with a wide range of
corporate information including details of the Council Plan and
performance, equality, and diversity reporting.
There are appropriate governance and decision-making
arrangements in place at the council.
153.  Members and management of the council are responsible for
ensuring effective governance arrangements are in place, to ensure that
its business is conducted in accordance with the law and proper
standards, and that public money is safeguarded. Effective governance
arrangements also enable the council to monitor how effectively it is using
its resources. 
154.   An annual review of governance arrangements is reported to the
Council.  Following the last review in September 2024 the Scheme of
Delegation was reformatted to reflect the Council’s new directorate
structure.
The council offers a training programme for members in
addition to e-learning and the opportunity to attend
Improvement Service events and webinars
155.  The Accounts Commission report on “Roles and Working
Relationships - Are you still getting it right?” emphasised that Councillors
need the skills and tools to carry out their role. This includes training in
relation to both Council and ALEO responsibilities, as well as scrutiny,
audit and financial decision making.
156.  A report on development support provided to members during the
period September 2024 to August 2025, on attendance rates, feedback
from current activities and on future planned development was presented
to the August 2025 Audit and Scrutiny Committee.  The report noted that
the council offers a full training programme for members in addition to e-
learning and the opportunity to attend Improvement Service events and
webinars. The number of internal development sessions held between
September 24 – August 25 was 18 sessions.  Individual member
attendance varied between attendance at 16 sessions to attendance at
none. 
157.  The report also noted that members have access to e-learning
modules on the iLearn system and although take up of this learning is low
although, one member completed eleven courses. These courses included
Cyber Security, Procurement and Transformation.    Overall there were
155 separate Member attendances at development sessions between Sep
24 and Aug 25. These figures include those aimed at specific committee
members (i.e. Appeals and Planning Committees). 
158.  The Council offers members an annual 1-2-1 Personal Development
Plan  discussion to discuss their development needs.  The report notes
216

Page 217

5. Vision, leadership and governance | 56 
that whilst take up for this is historically low several members have
approached Learning & Organisational Development with specific
requests which have been actioned.
Progress with the Ayrshire Growth Deal is reported but the
AEPB considers many papers in private
159.  The Economy and Fair Work Inquiry report notes that in its 2023
report, Scotland's City Region and Growth Deals: Progress of the 2020
audit report recommendations, Audit Scotland highlighted the need for
transparency, and that information should be available to the public so that
people can see why particular decisions on specific growth deal projects
were made.  The report also notes that whilst deals have made good
progress in raising public awareness, this is not consistent across all deals
and in some cases decisions and information on project selection are hard
to find in council committee papers.  
160.  The reporting process within the Council for the Ayrshire Growth Deal
progress involves routine capital and revenue monitoring through the
Capital Programme Assets Group  and revenue budgetary control
reporting to committee.  There are also special bi-monthly Executive
Leadership Team meetings.  Progress reports are also  submitted to the
Project Management Office (PMO) which sits within East Ayrshire Council. 
These reports are provided monthly, quarterly, bi-annually and annually
and the PMO collates the returns from the three Ayrshire councils and
reports to the Ayrshire Economic Partnership Board (AEPB).
161.  Our review of available agendas and reports for 2024 and 2025
AEPB meetings found that whilst some agendas are available, many of
the papers are not because ‘information contained  within  the  following 
report  is  confidential  information  within  the meaning of Section 50A of
the 1973 Act.’  One of the papers not available is the AGD Annual Report
2024/25. The council representatives on the AEPB should review the
range of reports it discusses in private and consider whether they feel it is
getting the balance right between open and closed consideration of items. 
217

Page 218

6. Use of resources to improve outcomes | 57 
6. Use of resources to improve
outcomes
Public sector bodies need to make best use of their resources to meet
stated outcomes and improvement objectives, through effective
planning and working with strategic partners and communities.
Conclusions
There has been regular reporting of the council’s progress with its
Council Plan priorities. Good progress has been made in completing
actions for year two of the plan however the council does not set out in
advance what criteria have to be met for an ‘on target’ judgement to be
made for each action.
Of the 33 LGBF PIs directly linked to Council Plan 2023-2028 priorities,
seventeen  priority PIs (52%) were within the top two quartiles for
2023/24.
The council’s performance, taken from national benchmarking data,
shows an improving position year-on year, but overall performance
relative to other councils has remained constant.
HMIe reported positively on how the council supports schools to improve
the quality of education. 
There has been regular reporting of the council’s progress
with its Council Plan priorities. Good progress has been
made in completing actions for year two of the plan
however the council does not set out in advance what
criteria have to be met for an ‘on target’ judgement to be
made for each action.
162.  Annual performance reporting to Cabinet in September 2025
combined three key Council Plan and corporate performance reports: 
• The Council Plan Six Monthly Progress Report (1st October 2024 to
31st March 2025)
• The Annual Performance Report 2024/25 
218

Page 219

6. Use of resources to improve outcomes | 58 
• The Local Government Benchmarking Framework (LGBF) -
Analysis of June 2025 Data Release 
163.  The latest six-monthly Council Plan progress report for the period 1
October 2024 to 31 March 2025 highlights that of the 46 actions in the
Plan, 45 were assessed as on target and only one was assessed as
slightly adrift of target (CP10: Increase the number of homes in the area
through a mix of private and social developments and bringing empty
buildings back in to use).  
164.  The actions within the Council Plan are high level and mapped to the
four priorities and strategies.  Progress on the actions is explained within
the narrative of the six-monthly report as well as in the “Performance
Summary” section, with RAG status recorded in the “Action Tracker” at the
end of the report.  In the narrative, a “Next Steps” section is included
under each priority to record improvement actions.  Officers have
confirmed that this provides an opportunity to immediately respond to, or
pre-empt areas for improvement and development without waiting for
strategies to be amended or for actions to become off-target. 
165.  However by recording areas identified for improvement, this does not
necessarily corroborate that the 46 areas are ‘on track’.  We reviewed
background information on progress recorded in Pentana for a sample of
eight ‘on target’ actions and concluded that for two of the sample, CP24 -
Ensuring an inclusive, fair, rights-based and asset-based approach in our
work, and CP41 - Using dynamic data and lived experiences to inform
decision making, there was a lack of transparency in how that conclusion
was reached.  
166.  The council does not set out in advance what criteria have to be met
for an ‘on target’ judgement to be made for each quarter, relying instead
on updates from individual teams leading on the strategies and other
supporting evidence (including ‘Next Steps’ from the previous report).  If
the ‘Next Steps’ actions were SMART it might be possible to analyse
whether all the relevant ones within the time period had been met and that
could feed into whether an action was on target.
Recommendation 3
The council needs to set out in advance what criteria have to be met for
an ‘on target’ judgement to be made for each action in the Council Plan.
167.  Of the 26 performance indicators in the Council Plan:
• 13 were on target
• 5 were slightly adrift of target 
• 6 were significantly adrift of target
219

Page 220

6. Use of resources to improve outcomes | 59 
• 2 were assessed as data not known/available. 
168.  The following six indicators were significantly adrift of target:
• CP_37 Average total tariff score of pupils living in SIMD 20%
most deprived areas - actual is 664.3 against a target of 714 for
2023 to 2024 (most recent data available). The endeavour to offer
candidates a wider breadth of learning experiences has included
more courses from a wider vocational range of courses and awards
that sometimes are graded at the same SCQF level as National
Qualifications courses but amass a smaller number of tariff points in
the Insight scale.
• CP_06 Average tariff score: All Leavers - actual is 840.8 against
a target of 908 for 2023 to 2024 (most recent data available). The
council notes that for all SIMD deciles except SIMD 10 (for which
they have a very low number of learners), they continue to
outperform national figures.
• CP_38 Average total tariff for care experienced Young People -
actual is 355 against a target of 465. The service continue to focus
on improving this benchmark of achievement for care experienced
learners.
• CP_40 Number of new build housing units reaching
completion (all tenures) (actual not cumulative) - Actual is 371
against a target of 396.  The council note that they have limited
influence over the delivery of new build housing constructed by
private housing developers to meet the total 396 homes target.
• CP_30 Total installed capacity of low carbon heat and
electricity generation across the council's estate - Actual is
17,630 against a target of 28,499. The council had aimed to have
both solar PV farms energised in December of 2024, however this
has not been possible due to extended development time required
by the Distribution Network Operator.
• CP_31 % of total household waste that is recycled (calendar
year as per SEPA) (LGBF) - Actual is 52.8% against a target of
56%. This has reduced since 2023 as a result of the introduction of
the new SEPA guidance regarding the requirement for Waste
Upholstered Domestic Seating to only be sent for incineration,
which has negatively affected the amount of bulky waste that can
be recycled.
220

Page 221

6. Use of resources to improve outcomes | 60 
Of the 33 LGBF PIs directly linked to Council Plan 2023-
2028 priorities, during 2023/24, seventeen priority PIs were
within the top two quartiles. 
169.  The council participates in the Local Government Benchmarking
Framework (LGBF). The framework brings together a wide range of
information about how all Scottish councils perform in delivering services,
including the cost of services and how satisfied citizens are with them. In
analysing the LGBF data we recognise that local policy choices about
council services and strategic priority areas will have an impact on the
results. 
170.  The most recent National Benchmarking Overview Report 2023/24
by the Improvement Service was published in June  2025. The results
were considered by the Cabinet in September 2025 along with council
specific commentary on where improvement activity is planned or already
underway. The council has identified 33 key LGBF measures that relate
directly to Council Plan priorities, 12 of which are included in the
Performance Management Framework and reported six-monthly. The
information reported to members records that: 
• During 2023/24, 17 priority PIs were within the top two quartiles.
These include proportion of the highest paid 5% of employees who
are women, gender pay gap and percentage of invoices sampled
that were paid within 30 days. 
• Over the short term (comparison with previous year), performance
has improved for 23 (69.7%) and declined for 10 (30.3%).  Rank
has improved for 18 (54.5%), declined for 11 (33.3%), and stayed
the same for 4 (12.1%).  Quartile has improved for 8 (24.2%),
declined for 6 18.2%), and stayed the same for 19 (57.6%).
• 30% of long term indicators (10 years or most recent data available)
have improved, 33% have declined and 37% have stayed the
same. 
The council’s performance, taken from national
benchmarking data, shows an improving position year-on
year but overall performance relative to other councils has
not improved.
171.    The 2023/24 LGBF data on the council, published by Improvement
Service in June 2025, shows that, of the 107 indicators reported to date
that are relevant to the council, 61 (57 per cent) of these have improved
over time since the base year.  Over the most recent year, 44 (42%) have
improved.
172.  . However, the number of indicators in the top two quartiles has
remained at 50 per cent from the base year to 2023/24 (exhibit 11). These
221

Page 222

6. Use of resources to improve outcomes | 61 
results indicate an improving position year-on year but overall
performance relative to other councils has remained constant.
Exhibit 11
Proportion of indicators in the top two quartiles from the base year to 2023/24 
Source: Improvement Service – LGBF 2023/24
• Childrens Services: Of the indicators in the area, the council is in the top
two quartiles in 31 per cent of these, down from 47 per cent in the base
year. The council continues to rank significantly above both the family
average and the national average in cost per primary pupil and cost per
secondary pupil.  The council is also below both the family average and
the national average in the % of P1, P4 and P7 pupils achieving
expected CFE levels in both Literacy and Numeracy.  North Ayrshire’s
school attendance rate of 89.1% in 2023/24 reflects a slight improvement
from the previous year but still ranks among the lowest in Scotland (5th=
lowest).  Persistent absence remains a critical challenge for North
Ayrshire, with 37.9% of pupils missing more than 10% of possible
attendances in 2023/24, which is the highest rate in Scotland and is
significantly higher than the Scotland-wide figure of 31.4%.
• Adult Social Work Services: Since the base year, the council’s top two
quartile position relative to others has increased from 0 per cent to 36 per
cent. However, the council continues to rank significantly below both the
family average and the national average in the number of days people
spend in hospital when they are ready to be discharged, and Self-
Directed Support spend on adults as a % of total social work spend. 
173.  Given the service demand and cost pressures facing councils it is
unlikely that they will be able to maintain performance across all the
services they currently provide.  This means that councils will need to
222

Page 223

6. Use of resources to improve outcomes | 62 
make increasingly difficult choices about what their service and
performance priorities are.
174.  North Ayrshire Council will continue to use the LGBF data alongside
its own performance management framework and its engagement with its
communities to assess its local performance and priorities. This will
provide it with a breadth of data to help inform and identify where
improvements and better outcomes for its communities can be achieved. 
Publication of the LGBF forms part of each council’s statutory
requirements for public performance reporting.
HMIe reported positively on how the council supports
schools to improve the quality of education
175.  A local area network (LAN) of auditors and inspectors who cover the
Council’s activities met during the year to share intelligence,  to ensure the
scrutiny of the councils is targeted and proportionate in relation to
identified risks and to avoid duplication of coverage.  HMIe is a member of
the LAN.  
176.  In June 2024, His Majesty’s Chief Inspector of Education (HMIe)
launched a national thematic inspection of Scotland’s local authorities.
This inspection focused on how effectively local authorities support school
improvement with a focus on how they support schools to improve the
quality of education.  All 32 local authorities were inspected between
September and October 2024.  In September/ October 2024, a team of
inspectors from Education Scotland visited North Ayrshire Council. 
Findings specific to North Ayrshire were generally very positive, including:
• The Quality Improvement Framework (QIF) provides clear guidance
on self-evaluation, planning, and reporting, ensuring consistency; 
• Strong leadership and collaboration foster trust, enabling honest
discussions and tailored support for schools;
• A rigorous quality improvement cycle includes school visits, data
analysis, and peer collaboration;
• The Professional Learning Academy (PLA) offers structured, in-
school support, including “in residence” training;
• A strong culture of professional challenge and support ensures
accountability while fostering positive relationships;
177.  Local recommendations for future consideration were to:
• Further strengthen learner involvement in school evaluation and
planning;
223

Page 224

6. Use of resources to improve outcomes | 63 
• Enhance cross-sector collaboration – expand peer evaluation, subject
networks, and transition links between primary and secondary
schools; and
• Enhance systematic evaluation of impact of professional learning to
support long-term effectiveness.
178.  Officers have confirmed that these local recommendations will be
incorporated into the Education Service Improvement Plan from session
2025/26 onwards. 
224

Page 225

Appendix 1 | 64 
Appendix 1
Action plan 2024/25
2024/25 recommendations including Best Value (BV)
Thematic
Issue/risk Recommendation  Agreed management
action/timing
1. A number of significant
amendments have been
required to the Annual
Accounts to ensure in
particular that non-current
asset figures are fairly
stated.
A large number of audit
adjustments were required to
the financial statements to
correct misstatements
identified from the audit.  In
particular, we identified
misstatements of £82.374
million in the unaudited Annual
Accounts which arose as a
result of errors in the
classification and valuation of
Property, Plant and
Equipment. This is outwith the
norm following an audit and
has added additional pressure
for the audit team and council
staff in concluding the
audit.      
Risk: The deadline of 30
September for concluding the
audit is not achieved.   
The council should
review its arrangements
for preparing the Annual
Accounts. This should
include a review of
capital accounting
processes and
procedures. 
(Exhibit 2) 
Accepted
Management response:
A full review of capital accounting
year end procedures will be
carried out during 2025-26. This
will include the procedures for
reviewing information provided by
the Council’s valuation team and
the use of external valuers. 
Responsible Officer:
David Forbes, Senior Manager - 
Finance and Revenues 
Action by:
31 March 2026
225

Page 226

Appendix 1 | 65 
2. Impairment of non-current
assets
Accounting standards require
the council to assess at the
end of each financial year
whether there are any
indications an asset is
impaired. Most assets are
valued at least every five years
and generally when valued,
each asset is subject to a
physical inspection. There are
however some assets that are
never revalued. The council’s
impairment review is largely
limited to assets revalued and
should be made more robust
and comprehensive.
Risk: There is a risk that asset
values are overstated.  
An impairment review
should be conducted
whenever there is an
indication that an asset
might be impaired such
as physical damage,
obsolescence or
restructuring. The
existence of an
impairment indicator
may also suggest that
the remaining useful life
needs to be adjusted
even if no impairment
loss is recognised.
(Paragraph 23)
Accepted
Management response:
Under current procedures, an
impairment review is carried out
for all assets valued within the
financial year. In addition, the
valuation team undertakes an
annual impairment review to
determine if any assets not
revalued in year are subject to
material change. 
The Accounting Policies in
relation to asset impairment will
be reviewed and enhanced to
provide clear reference to the
impairment review process.
Responsible Officer:
David Forbes, Senior Manager - 
Finance and Revenues
Emma Mulholland, Team
Manager - Estates 
Action by:
31 March 2026 
226

Page 227

Appendix 1 | 66 
3. Progress on Council Plan
actions.
The council does not set out in
advance what criteria have to
be met for an ‘on target’
judgement to be made for
each quarter, relying instead
on updates from individual
teams leading on the
strategies and other supporting
evidence (including ‘Next
Steps’ from the previous
report).  If the ‘Next Steps’
actions were SMART it might
be possible to analyse whether
all the relevant ones within the
time period had been met and
that could feed into whether an
action was on target.
Risk: There is a lack of
transparency in how progress
is assessed for  Council Plan
actions.
The council needs to set
out in advance what
criteria have to be met
for an ‘on target’
judgement to be made
for each action in the
Council Plan.
(Paragraph 166) 
Accepted
Management response:
The Performance Management
Strategy is being revised and will
be presented to the Audit and
Scrutiny Committee on 20th
November 2025.  This public
facing strategy will contain details
of how to determine the status of
Council Plan actions based on
existing strategies and next
steps.  This approach will be
supported by additional training
for teams providing updates
during 2026.
The Council Plan Progress
Reports will include SMART next
steps.  These next steps will be
recorded within our performance
management system to track
their status transparently and
inform the status of Council Plan
actions.
Responsible Officer:
Isla Cruickshanks, Senior
Manager – Policy, Performance &
Democracy
Action by:
20 November 2025
227

Page 228

Appendix 1 | 67 
BV1. Transformation
savings fall significantly
short of the savings required 
The council’s latest MTFO
identifies a structural funding
gap of £46.7m (including
HSCP pressures) which must
be addressed as part of the
council’s Medium-Term
Financial Plan. Whilst we
recognise that transformation
alone will not offer the full
solution to the financial gap
identified in the MTFO, the
level of financial efficiencies
from the Sustainable Change
Programme should be
commensurate with the scale
of the financial challenges.
The council should
ensure its plans are
sufficiently ambitious to
respond to its financial
challenges. It should
clearly set out the extent
to which savings from
transformation will help
address the budget
shortfalls set out in its
Medium-Term Financial
Plan.
Accepted 
Management response: 
It is recognised that the level of
financial efficiencies should be
commensurate with the scale of
the financial challenges. Further
work will be progressed as part of
the council’s medium-term
financial planning to set out
clearly how the council plans to
address budget gaps through
further transformation and reform
activity and through a broader
package of measures, including
areas of service review and
possible reduction, opportunities
for further revenue generation
and an ongoing planned use of
council reserves. 
Responsible officer: 
Head of Service (Financial
Services) 
Actioned by:
31 March 2029
BV2. Public reporting on
progress with
transformation 
The council does not currently
report publicly on how it is
progressing with delivering
transformation as a whole in
terms of planned and realised
financial and non-financial
benefits.
To provide assurance to
elected members and
the public about how the
council plans to change
to sustain services in
the future the council
should report publicly on
how it is progressing
with delivering
transformation, as a
whole, in terms of
planned and realised
financial and non-
financial benefits.
Accepted 
Management response: 
The development of more public
facing material will be produced
to demonstrate the council’s
progress on the Sustainable
Change Programme. This will
include use of the council’s new
website to further promote activity
and the progress being made to
address the financial challenges. 
Responsible officer:
Head of Service (Financial
Services) 
Actioned by:
30 September 2025
228

Page 229

Appendix 1 | 68 
2023/24 agreed management actions where action is still 
outstanding
Issue/risk Recommendation  Agreed management
action/timing
1. Asset register – fully
depreciated assets 
The asset register
included around 840
assets which were fully
depreciated with an
original cost and
accumulated depreciation
of £57.226 million.  
Where assets are no
longer in use they should
be formally scrapped or
sold. Significant assets
continuing in use should
be revalued and
depreciated over the
remaining useful
economic life. 
Where significant fully
depreciated assets are still in
use they should be revalued
and depreciated over their
remaining useful economic
life. Other assets should be
considered for disposal. The
council should obtain
evidence at least annually to
confirm that assets on the
asset register remain in use. 
Ongoing
A review of fully depreciated
assets was carried out during
2024/25 and items with a value of
£27 million were removed from
the asset register where
appropriate. A further review will
take place in October 2025 in
conjunction with services to
update valuations and useful
economic lives as required.
We will monitor full
implementation of this
recommendation as part of our
2025/26 audit.
2. Sickness absence
High absence rates were
reported in areas which
require cover
arrangements,
specifically teachers and
waste collection. In
2023/24 this resulted in
additional costs of
£1.980m associated with
mandatory cover for
teacher absence.  There
was also a £0.653 million
overspend in employee
costs for Waste Services. 
The statutory nature of
the service requires
additional resources to
cover unforeseen
absences. 
The effectiveness of existing
measures to reduce absence
levels should be assessed to
ensure they are appropriate
and can deliver improved
attendance at work. 
Ongoing
During 2024/25, significant
emphasis has been placed on
strengthening data interrogation,
improving recording and
reporting, increasing monitoring
and re-education of managers,
and that this has been
demonstrated through an
improved council absence
position improved at Q4 2024/25
compared to Q4 2023/24.  
See paragraphs 147 to 149. 
We will monitor full
implementation of this
recommendation as part of our
2025/26 audit. 
229

Page 230

Appendix 1 | 69 
2023/24 agreed Best Value (BV) thematic actions where
action is still  outstanding 
Issue/risk Recommendation  2024/25 update 
BV1. Joint workforce
arrangements
There is scope for the
council to explore further
where it can work
together with partners to
share services and
increase collaboration. 
Risk: There is a risk the
council may not be
utilising opportunities for
shared services and
collaboration
opportunities across
partner organisations. 
The council should explore
further where it can work
together with partners to
share services and increase
collaboration. 
Accepted
Management response 
The Medium-Term Financial
Planning process for 2025/26 to
2027/28 will include the
exploration of further
opportunities for sharing services
and collaboration across partner
organisations.
Responsible officer
Mark Boyd
Actioned by
31 March 2026 
BV2. Measuring the
impact of workforce
planning
There is scope for the
council to draw upon the
information it already
collects to develop a
performance dashboard
to monitor and inform
future workforce planning
practice.
Risk: There is a risk that
the workforce planning
information the council
already collects is not
being used to full effect.  
The council should develop a
performance dashboard to
provide a user-friendly
overview of the impact of its
workforce planning. This
could help to inform future
workforce planning.   
Accepted
Management response 
A performance dashboard will be
developed to monitor and inform
future workforce planning. 
Responsible officer
Fiona Walker 
Actioned by
30 September 2025 
230

Page 231

Appendix 1 | 70 
2022/23 agreed management actions where action is still 
outstanding
Issue/risk Recommendation  2024/25 update 
Dormant trusts 
Six charitable Trusts have
been dormant for 3 years or
more. There is no clear plan
on how to bring the Trusts
back in to use. This indicates
that the Trusts are not
meeting the requirement of
public benefit. 
Risk: The Trusts do not meet
the requirement of public
benefit.
The body should ensure all
Trusts have adequate
governance documentation
enabling grants to be issued.
The Trust should also be
suitably advertised.
Ongoing
North Ayrshire Council
continues to promote the
various funding sources,
trusts and bequests available
for distribution, ensuring that
our staff teams, partners and
communities are aware of the
available financial supports.
This is a long term piece of
work and part of a strategic
aim to ensure coordination of
funding support across
council services is clear and
consistent.
We will review this further as
part of our 2025/26 audit. 
231

Page 232

Appendix 2 | 71 
Appendix 2
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2024/25 15 May 2024
Scotland’s colleges 2024 19 September 2024
Integration Joint Boards: Finance and performance 2024 25 July 2024
The National Fraud Initiative in Scotland 2024 15 August 2024
Transformation in councils  1 October 2024
Alcohol and drug services 31 October 2024
Fiscal sustainability and reform in Scotland  21 November 2024
Public service reform in Scotland: how do we turn rhetoric
into reality? 26 November 2024
NHS in Scotland 2024: Finance and performance 3 December 2024
Auditing climate change 7 January 2025
Local government in Scotland: Financial bulletin 2023/24 28 January 2025
Transparency, transformation and the sustainability of council
services 28 January 2025
Sustainable transport  30 January 2025
A review of Housing Benefit overpayments 2018/19 to 2021/22:
A thematic study 20 February 2025
Additional support for learning 27 February 2025
Integration Joint Boards: Finance bulletin 2023/24 6 March 2025
Integration Joint Boards finances continue to be precarious 6 March 2025
General practise: Progress since the 2018 General Medical
Services contract 27 March 2025
Council Tax rises in Scotland 28 March 2025
232

Page 233

North Ayrshire Council
2024/25 Annual Audit Report 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
233

Page 234

234