Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 28 August 2025 at 10:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
2 Minutes
The accuracy of the Minutes of (a) the Meeting of the Audit and Scrutiny
Committee held on 29 May 2025 and (b) the Special Meeting of the Audit
and Scrutiny Committee held on 19 June 2025 will be confirmed and the
Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the
Local Government (Scotland) Act 1973
3 2024/25 Elected Member Requests Report
Submit report by the Head of Democratic Services informing of the
Council's performance relating to Elected Member requests handled in
Financial Year 2024/25 (copy enclosed).
4 2024/25 Complaint Report
Submit report by the Head of Democratic Services informing of the
Council's complaint performance and volumes and trends of complaints
received in Financial Year 2024/25 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
5 Elected Member Development
Submit report by the Head of Democratic Services providing information
and seeking views on the development sessions provided to Elected
Members over the 12 months from September 2024 to August 2025, and
on future planned
development sessions (copy enclosed).
6 Accounts Commission’s Briefing: Local Government Budgets
2025/26
Submit report by the Head of Finance informing of the key messages
identified within the recently published briefing (copy enclosed).
7 Internal Audit Reports Issued
Submit report by the Head of Finance informing of the findings of Internal
Audit work completed since May 2025 (copy enclosed).
8 Internal Audit and Corporate Fraud Action Plans: Quarter 1 Update
Submit report by the Head of Finance advising on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 30 June 2025 (copy enclosed).
9 Standing Item of Business: Consideration of future business for
scrutiny
10 Urgent Items
Any other items which the Chair considers to be urgent.
Exclusion of the Public - Para 1
Resolve in terms of Section 50(A)4 of the Local Government (Scotland) Act
1973, to exclude from the Meeting the press and the public for the following
item of business on the grounds indicated in terms of Paragraph 1 of Part
1 of Schedule 7A  of the Act.
Non Disclosure of Information
In terms of Standing Order 21 (Disclosure of Information), the information
contained within the following report is confidential information within the
meaning of Section 50A of the 1973 Act and shall not be disclosed to any
person by any Member or Officer.
11 Investigation Reports Issued
Submit report by the Head of Finance informing of investigation reports
finalised since the last meeting (copy enclosed).
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
Audit and Scrutiny Committee Sederunt
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney
Chair:
Apologies:
Attending:
4

Page 5

Audit and Scrutiny Committee
29 May 2025 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Eleanor Collier, Cameron Inglis and Tom Marshall. 
Present (Remote Participation)
Davina McTiernan and Donald L. Reid. 
In Attendance (Physical Participation)
D. Hammond, Executive Director (Communities and Housing); E. Currie, Principal
Manager (Finance) (Health and Social Care Partnership); T. Reaney, Head of
Service (Neighbourhood Services) (Place); M. Boyd, Head of Service, D. Forbes,
Senior Manager (Strategic Business Partner), J. McCallum, Senior Manager (Audit,
Fraud, Safety and Risk) and S. Paisley, Senior Manager (Transformation) (Finance);
F. Walker, Head of Service (People and ICT); A. Craig, Head of Service, M. Sugden,
Communications Officer (Public Relations) and C. Stewart, Committee Services
Officer (Democratic Services) (Corporate Services). 
In Attendance (Remote Participation)
C. Hatton, Chief Executive. 
Also in Attendance (Physical Participation)
D. Jamieson, Audit Scotland. 
Chair
Councillor Bell in the Chair. 
Apologies
John Sweeney. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting of the Audit and Scrutiny Committee held on 13 March
2025 were confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973. 
3. Update on purple bin lids 
Submitted report by the Executive Director (Place) providing an update on the
actions taken to resolve the issues experienced with purple bin lid defects.
Agenda Item 2
5

Page 6

Officers were heard in response to Members’ questions. Noted. 
4. Code of Corporate Governance Statement 2025/26 
Submitted report by the Head of Service (Democratic) seeking approval of the Code
of Governance Statement 2025/26. The Code of Corporate Governance Statement
2025/26 was attached at Appendix 1 to the report. 
Officers were heard in response to Members’ questions. 
The Committee agreed to (a) approve the Code of Corporate Governance Statement
2024/25, as detailed at Appendix 1 to the report; and (b) otherwise note the content
of the report and associated Appendix. 
5. Audit Scotland: North Ayrshire Council Best Value Thematic
Management Report: Transformation 
Submitted report by the Head of Service (Finance) on the findings of the recent Audit
Scotland report on how councils are redesigning and delivering more efficient
services to achieve planned outcomes. 
D Jamieson, Audit Scotland addressed the committee in terms of the Audit Scotland
report, its findings and recommendations. 
Officers and D. Jamieson were heard in response to Members’ questions. Noted. 
6. 2023/24 External Audit Action Plan Update 
Submitted report by the Head of Service (Finance) on the updated actions identified
in the 2023/24 External Audit Action Plan. Appendix 1 to the report provided an
update on the management actions taken to date including updated target dates for
any outstanding items. 
Officers were heard in response to Members’ questions. 
The Committee noted that a briefing note would be prepared by the Head of Service
(People & ICT) and issued to Members on the trends of sickness and absence rates
of the Council over the last 5 years (including the pre-pandemic year). 
7. Annual Governance Statement 2024/25 
Submitted report by the Head of Service (Finance) on the Council’s Annual
Governance Statement for 2024/25 which will be included within the draft Annual
Accounts. The draft Annual Governance Statement was attached at Appendix 1 to
the report. 
Officers were heard in response to Members’ questions. 
6

Page 7

The Committee agreed to approve the draft Annual Governance Statement as
outlined in Appendix 1 to the report. 
8. Accounting Policies 2024/25 
Submitted report by the Head of Service (Finance) seeking approval of the
accounting policies which will be adopted in the preparation of the Council’s Annual
Accounts for the year to 31 March 2025. The accounting policies were attached at
Appendix 1 to the report. 
The Committee agreed to approve the accounting policies as outlined in Appendix 1
to the report. 
9. Strategic Risk Register 2025/26 
Submitted report by the Head of Service (Finance) on the Council’s agreed Strategic
Risk Register for 2025/26. The Strategic Risk Register Report 2025/26, with detailed
actions, was provided at Appendix 1 to the report. 
Officers were heard in response to Members’ questions. Noted. 
10. Internal Audit Annual Report 2024/25 
Submitted report by the Head of Service (Finance) on the work of Internal Audit
during 2024/25 and providing an opinion on the governance, risk management and
internal control environment of the Council. The Annual Report 2024/25, together
with a statement on internal controls, was detailed at Appendix 1 to the report. 
The Committee agreed to note (a) the content of the annual report detailed at
Appendix 1 to the report; and (b) the opinion of the Senior Manager on the Council’s
governance, risk management and internal control environment. 
11. Corporate Fraud Team Annual Report 2024/25 
Submitted report by the Head of Service (Finance) on the work of the Corporate
Fraud Team during 2024/25, including the number of referrals for investigation and
the outcomes of those investigations. Participation in International Fraud Awareness
Week and the National Fraud Initiative was also highlighted. 
Noted. 
12. Internal Audit and Corporate Fraud Action Plans: Quarter 4 Update 
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 31 March 2025. 
Noted. 
7

Page 8

13. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) on the findings of Internal Audit
work completed since March 2025. The findings from four audit assignments were
detailed at Appendix 1 to the report, together with the respective executive
summaries and action plans. 
Noted. 
14. Standing Item of Business: Consideration of future business for
Scrutiny 
Members were invited to consider potential items of scrutiny business for future
meetings. 
In relation to a request by Councillor Marshall and having heard the Head of
Democratic Services, it was noted that a report on GLOW and clarification on the
extent to which it was used in the schools community in North Ayrshire, including
security aspects thereof, would be reported to a future meeting of the Committee, for
Members’ information. 
It was noted that in relation to a request for information, at the previous meeting of
the Committee, on the impact of sickness absence levels on the overtime budget of
services and loss of service, this information had been provided by the Head of
Service (Finance) in an email circulated to Members on 4 April 2025. 
15. Urgent Items 
There were no urgent items. 
The meeting ended at 11.30 a.m. 
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home 
8

Page 9

Audit and Scrutiny Committee
19 June 2025 
At a Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
at 2.00 p.m. involving participation by remote electronic means and physical
attendance within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Donald Reid, Matthew McLean, Davina McTiernan and John Sweeney. 
Also Present
Todd Ferguson and Tony Gurney. 
Present (Remote Participation)
Eleanor Collier, Cameron Inglis, Tom Marshall and Donald L. Reid. 
In Attendance (Physical Participation)
T. Reaney, Head of Service (Neighbourhood Services) (Place); A. Craig, Head of
Service, J. Hutcheson, Senior Communications Officer (Media and Internal
Communications), C. Stewart, Committee Services Officer and H. Young, Senior
Committee Services Officer (Democratic Services) (Corporate Services). 
Chair
Councillor Bell in the Chair. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Call-In: Implementation of the National 20mph Speed Limit Strategy 
Submitted report by the Head of Service (Democratic) on a call-in request received
in respect of a decision taken by Cabinet on 3 June 2025 on the proposed
implementation of the National 20mph Speed Limit Strategy within North Ayrshire
(Implementation plans were attached at Appendix 1 to the report). The original
Cabinet report was attached at Appendix 1 to the report. Appendix 2 to the report
contained a briefing note provided by the Head of Service (Neighbourhood
Services) in response to the matters raised in the call-in request form. 
The Cabinet on 3 June 2025 agreed to (a) note the Scottish Government’s National
Strategy for 20mph in Urban areas; and (b) approve the implementation of 20mph
speed limits on appropriate roads as detailed in the implementation plans attached at
Appendix 1 to the report. 
Subsequently, a call-in request was received from Councillors Todd Ferguson,
Gallacher and Stalker in the following terms:- 
Reason for Call-In 
9

Page 10

“The Scottish Government’s National 20mph Strategy is aspirational in tone but
experimental in scope. While well-intentioned, its widespread implementation lacks
sufficient evidence of efficacy, especially on roads already exhibiting average speeds
below 25mph. 
This policy, if adopted without amendment, risks diluting police and Council resources,
adversely affecting public transport efficiency, and imposing unjustifiable burdens on
the public purse—contrary to the financial prudence owed to North Ayrshire’s
taxpayers. 
The Strategy also raises legitimate legal and democratic concerns regarding adequacy
of consultation, particularly among working residents, rural communities, and small
business owners who will bear the practical consequences of slower road speeds and
delayed logistics. 
As a matter of public administration, the Council must guard against overreach in
regulatory intervention without evidence-based justification and must uphold the
principle of proportionality, particularly when imposing restrictions on public freedoms.” 
Desired Outcome 
“The Conservative Group respectfully calls upon Cabinet to: 
1. Suspend the blanket implementation of the 20mph speed limit across all roads
identified in Appendix 1, pending the outcome of a full review of cost-
effectiveness, enforceability, and public consultation. 
2. Commission an independent impact assessment, consistent with principles of
Best Value as defined in the Local Government in Scotland Act 2003, before
any further capital expenditure is incurred. 
3. Adopt a targeted and proportionate approach, taking into account the feedback
from the public consultation referenced above and elected members, with
20mph zones restricted to locations supported by empirical safety data—such
as near schools, care facilities, or recorded accident blackspots.” 
The Head of Democratic Services summarised the procedure for considering the
call-in request in terms of Standing Orders and referred to the Cabinet decision. 
Thereafter, the Members who had requested the call-in were invited to speak and
Councillor Ferguson addressed the Committee in support of the call-in request. 
The Chair then invited Councillor Gurney, as the Cabinet Member for Green
Environment and Economy, to address the meeting.  Councillor Gurney explained
the reasoning for the Cabinet decision and referred to a briefing note from the Head
of Service (Neighbourhood Services) provided at Appendix 2 to the report. He was
also heard in answer to Members’ questions. 
The Head of Service (Neighbourhood Services) was then heard in relation to the
report presented to Cabinet and on issues raised by the call-in, reference being
made to the briefing note at Appendix 2 to the report, as well as in answer to
Members’ questions.
10

Page 11

Councillor Donald L. Reid, seconded by Councillor McTiernan, moved that the
Committee agree not to support the call-in request and that the decision of Cabinet
should stand. 
As an amendment Councillor Inglis, seconded by Councillor Marshall, moved that
the Committee agree to accept the terms of the call-in request and refer the matter to
the Cabinet for further consideration. 
Thereafter, on a division and a roll call vote, there voted for the amendment,
Councillors Inglis, Marshall and McLean (3) and for the motion, Councillors Bell,
Reid, Collier, McTiernan, Donald L. Reid and Sweeney (6).  The motion was
declared carried. 
Accordingly, the Committee agreed (a) not to support the call-in request; and (b) that
the decision of Cabinet should stand. 
The meeting ended at 3.20 p.m. 
11

Page 12

12

Page 13

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    2024/25 Elected Member Requests Report 
Purpose:  To inform the Audit and Scrutiny Committee of the Council's
performance relating to Elected Member requests handled in
Financial Year 2024/25. 
Recommendation:  That the Committee notes the report and the information
provided. 
1. Executive Summary 
1.1 This report details Elected Member requests information covering the period 1 April
2024 to 31 March 2025 (referred to in the report as 2024/25). 
2. Background 
2.1 This section contains information and commentary on Elected Member requests
handled by the Council during Financial Year 2024/25. 
2.2 Volume of Elected Member requests actioned during the year (including MP/
MSP): 
Volume of requests actioned during year 2,998 
2.2.1 Councillor requests can be handled by Services under two stages: 
Stage One – non-complex requests with a timescale to action of 5 working days
Stage Two – complex requests with a timescale to action of 20 working days 
Agenda Item 3
13

Page 14

2.2.2 The table below details all Councillor requests actioned during the year: 
2024/25
Total Actioned 2,287
Stage One requests actioned 2,284
Stage One requests actioned on time 2,010
% Stage One requests actioned on time 88%
Stage Two requests actioned 3
Stage Two requests actioned on time 3
% Stage Two requests actioned on time 100%
Total % of requests actioned on time 88% 
2.2.3 Year on Year comparison 
2.2.4 The table below shows a comparison of the volume of Councillor requests received
and actioned over the last three years: 
Councillor Requests 2022/23 2023/24  2024/25  
Total Actioned 2,905 2,307 2,287
Stage One requests actioned 2,903 2,305  2,284 
Stage One requests actioned on time 2,588 2,003  2,010 
% Stage One requests actioned on time 89% 87%  88% 
Stage Two requests actioned 2 2  3 
Stage Two requests actioned on time 1 2  3 
% Stage Two requests actioned on time 50% 100%  100% 
Total % of requests actioned on time 89% 87% 88%
14

Page 15

2.3 Volume of requests per Directorate 
2.3.1 Councillor Stage One requests (5 working day timescale to action) 
Directorate Department
No. of
requests
actioned
No.
actioned
on time
%
actioned
on time
Average no. of
days to resolve
Stage Ones
Target
(days)
Corporate
Services
Committee & Member
Services 1 1 100% 10 5
Customer Services 21 16 76% 4.7 5
Financial Mgmt & Revenues 1 1 100% 1 5
Legal Services 17 14 82% 3 5
Communities &
Housing
Community Facilities 7 6 86% 3.4 5
Community Learning & Dev. 6 6 100% 2.3 5
Information & Culture 3 3 100% 1.6 5
Sports & Activity 3 3 100% 4.7 5 
Building Services 95 83 86% 3.3 5
Housing 520 458 88% 3.5 5
Planning 34 33 97% 2.9 5
Protective Services 33 27 82% 3.6 5
Education Education 38 29 76% 3.9 5
Facilities Management 10 9 90% 3.2 5
Place
Roads 551 519 94% 2.6 5
Streetscene 365 320 88% 3 5
Waste 296 256 86% 3.3 5 
Business Development 4 4 100% 2 5
Regeneration 36 25 69% 4.6 5 
Energy/Sustainability 15 14 93% 4.2 5
PMI 124 107 86% 3.9 5
Transport 3 3 100% 3 5
Health & Social
Care Partnership
Children, Families & Justice 18 15 83% 3.3 5
Finance & Transformation 3 3 100% 1.3 5
Health & Community Care 65 47 72% 4.8 5
Mental Health 11 5 100% 3.2 5
Other (Money Matters etc) 4 4 100% 2 5  
2,284 2,010 88% 3.2 5 
2.3.2 Councillor Stage Two requests (20 working day timescale to action) 
Directorate Department
No. of
requests
actioned
No.
actioned
on time
%
actioned
on time
Average no. of
days to resolve
Stage Ones
Target
(days)
HSCP Health & Community Care 1 1 100% 3 20
Place Roads 2 2 100% 1.5 20  
3 3 100% 2 20 
15

Page 16

2.4 MP/MSP requests 
2.4.1 MP and MSP requests have a set timescale of 10 working days to action and the table
below details the requests actioned during the period: 
2024/25
Requests actioned 711
Requests actioned on time 596
% of requests actioned on time 84% 
2.4.2 Councillor and MP/MSP requests that did not meet timescale was due to multiple
factors, including: 
• administrative errors
• employee/officer availability for reviewing/approving responses prior to issue
• reduced resources, causing delays investigating requests
• further information required to respond to requests (including from third parties)
• operational pressures. 
2.4.3 A comparison table showing MP/MSP requests over the last 3 financial years showing
volume received and performance: 
MP/MSP Requests 2022/23 2023/24 2024/25
Requests actioned 562 670 711
Requests actioned on time 495 496 596
% of requests actioned on time 88% 74% 84% 
2.5 Recording Councillor requests 
2.5.1 The table below shows how Councillor requests were logged throughout the year: 
Volume %
Volume of Councillor requests recorded 2,292 
Volume logged by Councillors  1,280 56%
Volume logged by Member Services 493 21%
Volume logged via other channels 519 23% 
2.5.2 Of the 2,292 requests logged by Councillors during the period, 21 Councillors used
their NAC online Member accounts to log requests themselves. 
2.6 Issue identified regarding follow up actions for Councillor requests 
2.6.1 At a previous Audit and Scrutiny Committee it was noted that that some Councillor
requests that required follow up actions were being closed with no further updates being
provided, causing difficulties for Councillors relaying closure information to constituents. 
16

Page 17

2.6.2 To address this, additional questions were added to the Elected Member request form
(from 1 October 2024) allowing services to record if a request had outstanding/follow up
actions, what these were and when they would be completed by. 
2.6.3 The number of Councillor requests that had follow up actions since the introduction of
the new questions was 108, of which 88 had been marked as complete at the time of
producing this report. 
3. Proposals 
3.1 It is proposed the Committee approves the report and recognises the Council’s
performance in handling Elected Member requests in relation to Section 2 above. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
17

Page 18

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 None. 
Aileen Craig
Head of Democratic Services 
For further information please contact Aileen Craig, Head of Democratic Services, on
01294 324 125. 
Background Papers
None
18

Page 19

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    2024/25 Complaint Report 
Purpose:  To inform the Audit and Scrutiny Committee of the Council's
complaint performance and volumes and trends of complaints
received in Financial Year 2024/25. 
Recommendation:  That the Committee notes the report and the information
provided. 
1. Executive Summary 
1.1 This report details complaint information relating to North Ayrshire Council during
Financial Year 2024/25, covering the period 1 April 2024 to 31 March 2025. 
1.2 To allow comparisons to be made the report also includes some complaint data
relating to 2022 and 2023. 
1.3 Performance is measured through several Scottish Public Services Ombudsman
(SPSO) performance indicators, some of which have national targets. 
2. Background 
2.1 This section contains statistical information and commentary on some of the key
complaint performance indicators. More information relating to the indicators can be
found in the attached report. 
2.2  Volume of complaints received 
Year Volume of complaints
2022/23 2,576
2023/24 1,948
2024/25 2,039 
2.2.1 A slight increase in complaints received when comparing 2024 with 2023 but still a
21% drop when compared with 2022.   
2.3 Complaint outcomes for closed complaints in 2024/25 
Agenda Item 4
19

Page 20

Stage One
Outcome 
% closed as Resolved* 47%
% closed as Upheld 21%
% closed as Partially Upheld 11%
% closed as Not Upheld 21% 
Stage Two
Outcome 
% closed as Resolved* 10%
% closed as Upheld 9%
% closed as Partially Upheld 26%
% closed as Not Upheld 53% 
2.3.1 *Up to 31 March 2021, a complaint that meets our complaint criteria could be upheld,
partially upheld or not upheld. From 1 April 2021 a fourth outcome became available to
use called ‘Resolved’. Resolved complaints are where the Council has taken action to
address a problem or issue without deciding on whether there were any failings (this
would happen where we agree a solution with the complainant at the outset without
needing to investigate the complaint). 
2.3.2 Complaint outcome analysis can be found in the attached report. 
2.4  Average time in working days for a full response at each Stage 
Stage One Average number of
working days to close
Target
2022/23 4.2 5 workings days or less
2023/24 3.8 5 workings days or less
2024/25 3.3 5 workings days or less 
Stage Two Average number of
days to close
Target
2022/23 14.9 20 working days or less
2023/24 16.8 20 working days or less
2024/25 15.5 20 working days or less 
2.4.1 The average time in working days for a response under both Stages has exceeded
the SPSO target response timescales for the last three years. 
2.5  Complaints closed within timescale in 2024/25 
Stage % closed on
time
Target
Stage One  92% 80% and above
Stage Two 93% 85% and above 
2.5.1  The volume closed on time includes extended complaints that met their new due dates. 
2.5.2  Further details of complaints not closed on time are contained in the attached report. 
20

Page 21

2.6  Changes or Improvements made as a result of complaints 
2.6.1 Services cannot always implement improvements because of complaints due to
several factors, including the feasibility of making changes and resource/budget
considerations. That said, improvements were made in some Services and a selection
are noted in the attached report. 
2.7   Compliments 
2.7.1 The Council received and recorded many compliments during the year. Some praised
specific individuals or teams, some related to more than one Service and some were
raised by employees complimenting other employees. A selection can be found in the
attached report. 
3. Proposals 
3.1 It is proposed the Committee approves the report and recognises the Council’s
complaint handling performance in relation to Section 2 above. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Two Stage Complaint Handling Procedure supports the Council's key priority of
delivering more effective and efficient service provision. It demonstrates commitment
through focussing on, and determining, trends for service improvement and delivery
for North Ayrshire residents, customers and visitors. 
Community Wealth Building
21

Page 22

4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 None. 
Aileen Craig
Head of Service for Democratic Services 
For further information please contact Darren Miller, Complaint Manager, on 01294 322
988. 
Background Papers
North Ayrshire Council Complaint Report 2024/25 
22

Page 23

North Ayrshire Council 
Annual Complaint Report 
2024 to 2025 
23

Page 24

Introduction         3 
1 Volume of complaints closed      4 
2  Volume of complaints closed on time  at both Stages   6 
3 Volume of complaints not closed on time per Directorate     6 
4 Key complaint topics       9 
5 Average time in working days for a full response   10 
6  Extended complaints       11 
7 Complaint Outcomes                                                                    12 
8  Improvements made as a result of complaints                        14 
9 Compliments        15 
10  SPSO complaint referrals      16 
11 Glossary         18
24

Page 25

Introduction
North Ayrshire Council always seeks to deliver the best services possible to its tenants, residents
and customers but it is recognised that dissatisfaction will sometimes occur. When it does, we want
to know what went wrong, why it went wrong and what we can do to make things right.
The Council recognises that valuable lessons can be learned from complaints which are defined as
being expressions of dissatisfaction from members of the public about actions, or lack of actions, or
about the standard of service provided by or on behalf of the Council.
The Council’s complaint handling procedure (CHP) has two stages for handling complaints from the
public.
Stage One complaints (also known as Frontline Resolution) are straightforward, non-complex
complaints the Council can resolve at the initial point of contact or as close to the point of service
delivery as possible. The Council has up to 5 working days to resolve these.
Stage Two complaints (also known as Investigations) are complaints the Council is typically unable
to resolve at Stage One and needs more time to carry out further investigation. This may be
because the nature of the complaint is complex, serious or high risk. The Council has up to 20
working days to resolve these.
This report details the Council’s complaint handling performance covering financial year 2024 to
2025 (1 April 2024 to 31 March 2025). Performance is measured via several Scottish Public Services
Ombudsman indicators (some of which have national targets) and complaint data relating to
previous years has been included in certain sections to allow comparisons to be made. 
Reporting complaints is a statutory requirement and is monitored by Audit Scotland.
This report has been reviewed for accessibility prior to publication.  
25

Page 26

1 Volume of complaints closed
The Council received 2,039 complaints during the year and closed 2,022. 
The table below provides a breakdown of the closed complaints per Directorate:
Directorate Volume
Communities & Housing 435
Corporate Services 131
Education 234
Health & Social Care 143
Place 1,076
Multi-Service 3
The following tables highlight complaint volumes per Directorate under each Stage:
Corporate Services
Team Stage One Stage Two
Committee & Member Services 0 1
Communications 1 0
Customer Services 104 9
Finance 4 0
IT 3 0
Legal Services 6 2
Policy, Performance & Elections 1 0
Total 119 12
Communities & Housing
Team Stage One Stage Two
Building Services 237 10
Community Facilities 2 1
Housing 121 28
Information & Culture 5 0
Planning 8 4
Protective Services 15 4
Total 388 47
Education
Team Stage One Stage Two
Education (HQ) 23 22
Education (Schools) 132 38
Facilities Management 19 0
Total 174 60
Health & Social Care
Team Stage One Stage Two
Children, Families & Justice 24 12
26

Page 27

Team Stage One Stage Two
Finance & Transformation 2 3
Health & Community Care 76 12
Mental Health 3 10
Support Services 1 0
Total 106 37
Place
Team Stage One Stage Two
Growth & Investment 1 0
Property Management & Investments 168 13
Regeneration 2 0
Roads 80 17
Streetscene 99 8
Sustainability 2 0
Transport 3 0
Waste Services 676 7
Total 1,031 45
Multi-Service
Team Stage One Stage Two
Complaints involving more than one Service 0 3
Total 0 3
Although there is no target for the volume of complaints handled under each Stage, the Council
seeks to maximise closure at Stage One wherever possible and 90% were handled at this Stage
during the period.
Some Services handled all their complaints at Stage One.
Some Services that received high complaint volumes handled few of them at Stage Two, notably
Building Services, Property Management & Investments, Streetscene and Waste Services due to the
straightforward nature of the complaints received.
Whilst most of Waste Services complaints related to missed bin collections and assisted pullouts,
the number of complaints received for the service in 2024/25 showed a reduction of 27%
compared to 2023/24. Despite ongoing challenges regarding absence levels, the service remains
focused on service delivery. 102,000 household waste bins are emptied each week, which equates
to 5.3 million collections over the year. The number of complaints therefore received in 2024/25 is
equivalent to 0.013% of all bins collected. 
Year on Year comparison
The table below shows a comparison of the volume of complaints received over the last three
years:
Year Volume of complaints
2022/23 2,576
27

Page 28

Year Volume of complaints
2023/24 1,948
2024/25 2,039
Whilst there has been a slight increase in complaints received when comparing 2024 with 2023, it is
still a 21% drop when comparing 2024 with 2022. The sustained lower volume could be partly
attributable to the complaint page on the Council’s website being enhanced in 2023, which now
includes more information on what the Council does not consider a complaint and offers
appropriate routes to raise such matters.
2 Volume of complaints closed on time at both Stages
Stage Percentage
closed on time
Target
Stage One  92% 80% and above
Stage Two 93% 85% and above
The volume closed on time includes complaints that had their timescales extended and met the
new due dates.
3 Volume of complaints not closed on time per Directorate
This section provides details of complaints not closed on time under each Stage and includes
extended complaints that did not meet their new timescales.
Stage One
141 complaints did not meet timescale during the year and the volumes are noted below.
Corporate Services 
Department Volume
Customer Services 2
Communities & Housing
Department Volume
Building Services 18
Community Facilities 1
Housing 16
Planning 1
Protective Services 3
Education
Department Volume
Education (HQ) 7
Education (Schools) 11
28

Page 29

Health & Social Care
Department Volume
Children & Families 5
Health & Community Care 10
Mental Health 1
Place
Department Volume
Property Management 13
Roads 2
15Streetscene 15
Waste Services 36
Multiple reasons were noted as to why the above complaints did not meet timescale, including
administrative errors, complaint handlers awaiting information to progress complaints, employee
availability, resourcing issues and operational pressures.
Of the 141 Stage One complaints that did not meet timescale, 38 had their timescales extended the
additional 5 working days but none met their new due dates. 
In relation to the 103 complains that did not have their timescales extended, many could have been
extended given 77% were closed within the additional 5 working day timescale allowance.
Stage Two
14 complaints did not meet timescale during the year and the volumes are noted below.
Corporate Services
Department Volume
Legal Services 2
Communities & Housing
Department Volume
Building Services 1
Housing 4
Education
Department Volume
Education (Schools) 4
Health & Social Care
Department Volume
Mental Health 1
Place
Department Volume
Waste Services 1
Multi-Service
29

Page 30

Department Volume
Multi-Service 1
Reasons noted as to why the above complaints did not meet timescale are similar to those that did
not meet timescale at Stage One.
Of the 14 Stage Two complaints that did not meet timescale, 2 had their timescales extended but
neither met their new due dates. 
30

Page 31

4 Key complaint topics
Key topics for upheld and partially upheld complaints for Services are listed below. Services will not
be listed where there were low complaint volumes that did not allow meaningful analysis.
Corporate Services
Service Key complaint topic
Customer Services Communication
Customer Services Incorrect information provided
Communities & Housing
Service Key complaint topic
Building Services Communication
Building Services Follow up work not done
Building Services Quality issues (work incomplete or poor workmanship)
Education
Service Key complaint topic
Education (HQ & schools) Sensitive issues relating to teachers and/or pupils
Education (HQ & schools) Service delivery/provision
Education (HQ & schools) Employee Actions (alleged or perceived)
Health & Social Care
Service Key complaint topic
All HSCP Services Service delivery/provision
All HSCP Services Employee Actions (alleged or perceived)
Place
Service Key complaint topic
Property Management & Investment Gas Central Heating (maintenance etc.)
Property Management & Investment Planned Works
Roads Parking or Parking Enforcement Team
Streetscene Tree/grass/verge/hedge cutting issues
Waste Services Delays with new waste bin deliveries
Waste Services Failed bulky waste collections
Waste Services Missed waste bin/assisted collections (all colours)
‘Employee Actions (alleged or perceived)’ appears as a key topic for some Services but the
definition is broad and has been used where complainants alleged or perceived employee actions
or behaviour to be unacceptable. Whilst investigations may determine this is not always the case,
where unacceptable behaviour is identified Services will take the appropriate action to address.
31

Page 32

5 Average time in working days for a full response
The average time in working days to close complaints under both Stages during the year is noted
below. Values for previous years have been included to allow comparisons to be made. Any
complaints that had their timescales extended have been excluded from the calculations.
Stage One Average number of
working days to close
Target
2022 4.2 5 workings days or less
2023 3.8 5 workings days or less
2024 3.3 5 workings days or less
Stage Two Average number of days
to close
Target
2022 14.9 20 working days or less
2023 16.8 20 working days or less
2024 15.5 20 working days or less
The average time to close complaints under both Stages has consistently exceeded target. 
The tables below detail Services that did not meet the average time in working days for a response
under either Stage. Services that met the target are not listed and any complaints that had their
timescales extended have been excluded from the calculations.
Corporate Services
Stage Two Average number of
working days to close
Target
Legal Services 42.5 20 workings days or less
Two Legal Services complaints were closed on working days 24 and 61.  Clarification was sought
from one complainant which took a significant number of days for them to respond and a delay
was encountered with the other due to several factors, including an oversight on the part of the
complaint handler. 
Communities & Housing
Stage One Average number of
working days to close
Target
Community Facilities 9.5 5 workings days or less
One Community Facilities complaint was closed on working day 15 and this resulted in the average
days target being breached. No reason was given as to what caused the delay. 
32

Page 33

Education
Stage One Average number of
working days to close
Target
Education (HQ) 5.4 5 workings days or less
One HQ complaint was closed on working day 34 and this resulted in the average days target being
breached. The delay was due to employee availability.
Health & Social Care
Stage One  Average number of
working days to close
Target
Mental Health 7.5 5 workings days or less
One Mental Health complaint was closed on working day 11 and this resulted in the average days
target being breached. No reason was given as to what caused the delay. 
6 Extended complaints
202 complaints had their timescales extended during the year (167 at Stage One and 35 at Stage
Two). The complaints related to various Services across all Directorates.
There were various reasons for extending, including complainants, third parties and employees
being unavailable to assist or support with investigations and/or letter approvals, obtaining
additional information to support investigations and resourcing/operational issues. Of the 202
complaints that had their timescales extended, 80% were closed within their new target due dates. 
33

Page 34

7 Complaint Outcomes
The Council has four categories of complaint outcomes. 
• Resolved complaints are complaints where the Council has taken action to address a
problem/issue without needing to decide if there were any failings. 
• Upheld complaints are complaints where something has gone wrong/not happened and the
Council needs to take steps to address.
• Partially Upheld complaints are complaints that have multiple complaint elements, some of
which are upheld, the rest not.
• Not Upheld complaints are complaints that have not been upheld for the following reasons:
• they related to internal or external policies
• they related to external regulations
• upon investigation they were proven to be unfounded/unsubstantiated
The tables below detail the number of complaints upheld, partially upheld, not upheld or resolved
under both Stages.
Stage One
Outcome Percentage
Closed as Resolved 47%
Closed as Upheld 21%
Closed as Partially Upheld 11%
Closed as Not Upheld 21%
Of the 591 complaints that were upheld and partially upheld at Stage One, three services had the
highest volume, with Property Management & Investment at 15%, Building Services at 19% and
Waste Services at 28%. 
53% of all Resolved complaints related to Waste Services (mainly missed bin collections), indicating
those complainants simply wanted their bins collected without any need for investigation. 
Complaints that were not upheld related to internal or external policies and regulations or were
complaints that were found to be unsubstantiated.
Stage Two 
Outcome Percentage
Closed as Resolved 10%
Closed as Upheld 9%
Closed as Partially Upheld 26%
Closed as Not Upheld 53%
Stage Two complaints that were upheld or partially upheld were divided across multiple Services
across all Directorates.
The reasons for Stage Two complaints being closed as not upheld are the same as those for Stage
One.
34

Page 35

The tables below detail the outcomes at each stage covering the last three years: 
Stage One complaints
Year Resolved Upheld Partially Upheld Not Upheld
2022/23 47% 30% 9% 14%
2023/24 39% 32% 12% 17%
2024/25 47% 21% 11% 21%
Stage Two complaints
Year Resolved Upheld Partially Upheld Not Upheld
2022/23 3% 11% 40% 46%
2023/24 4% 13% 39% 44%
2024/25 10% 9% 26% 53%  
35

Page 36

8 Improvements made as a result of complaints
Council Services continually seek to identify improvements in service delivery and complaint
information is analysed regularly to inform service improvements. Some improvements were
implemented as a result of complaints received during the year and a selection is noted below.
What happened? What we did
A school organised a trip to an outdoor
amenity centre and a complaint was raised
after a child was accidentally left out of a
visit to a nearby local attraction.
The centre amended its risk assessment to
include roll calls as well as clarify whose
responsibility this is and in which situation i.e.
onsite/offsite and how/when that is
communicated by instructors to visiting group
staff. The school also amended its offsite risk
assessment regarding head count and staff have
been briefed on this. 
An employee repeatedly parked a Council
vehicle across the entrance to a set of
garages, contrary to signage in the area not
to block the entrance.
An apology was offered and the employee in
question reminded of their responsibilities when
parking a Council vehicle and not to park
anywhere where they would cause an
inconvenience. 
A customer contacted the Council to
request a refund of Council Tax given
double payments had been made. The
employee that spoke with the customer
explained why the double payments had
been made and advised when the refund
would be complete. This timescale was not
met as the full refund process was not
explained. 
An apology was offered to the complainant and
the refund subsequently received. 
A briefing was cascaded to all relevant
employees reminding them of the full process
for a refund being actioned and to ensure that
process was fully explained to customers where
refunds are being made.
A communication error between internal
departments resulted in the Residents
Notifications of upcoming road works not
being delivered within the timescale. 
A service has been appointed that will notify all
appropriate residents prior to road works
commencing.
A complaint was received regarding a
contractor undertaking work on a property
where a series of quality issues affecting a
neighbouring property were raised.
Improvements made to communication during
works on Council properties. The contractor was
also instructed to utilise a liaison officer to assist
with this improvement. 
36

Page 37

9 Compliments
Over 340 compliments were recorded cross-Council during the year, which is a 48% increase on the
previous year.  Whilst they cannot all be highlighted in this report, a selection is noted below.
• “This is a compliment to thank the Roads Service on the quick response to a streetlight service request.
The streetlight was out and the repair done within 2 days. Great work. My mum was well chuffed” 
• “Just returned from a 10-day holiday in Largs and wanted to compliment the Council on how
beautifully clean and tidy the streets were. Did not notice any litter anywhere and all the public toilets
were spotlessly clean. Hope you pass on well-deserved praise for all the hard work involved. Will
definitely holiday here again. Thank you so much.” 
• Thank You card received from a service user’s daughter to allocated HSCP Social Worker: 
“When you became involved in this case, matters proceeded quickly and effectively. This is a short
note to express our gratitude to you for the care, attention and consideration you gave to my mum's
care, which was appreciated by all the family." 
• “To the Waste Services men who regularly empty my bins - no matter whether it’s rain, snow or sun,
they always have time to wave and smile to my 3-year-old son. Makes my son’s morning every time.
Driver is the same - when my son sees him always makes effort to give him a wave. Small thing maybe
but a huge hit in our house. Much appreciated.” 
• A customer wanted to compliment a Customer Services Adviser for the outstanding service provided
on a call. The issue was resolved and the caller was very happy with the service provided. 
• “Thanks so much to Community Facilities for helping book the astro for my son's birthday. They had
a great time. We have had a lot going on this last year so to see him and friends just having fun running
around together was so good” 
• “This is a compliment for Streetscene for cleaning the street in New Street, Stevenston. This was only
reported today and the street has already been cleaned – the team also went into the garden and
removed the litter as well - well done” 
• “I recently camped at Eglinton Park for a show. We were all made very welcome by everyone, the
venue was beautiful, the toilets were always clean and well stocked and we were extremely well
catered for throughout the show. Everyone camping or attending the show on a daily basis were full
of praise and I therefore thought it was only right to thank you for all their hard work”  
37

Page 38

10 SPSO complaint referrals
The Scottish Public Services Ombudsman (SPSO) is the final stage for complaints about Local
Authorities in Scotland. The SPSO has published its 2024/25 referral statistics and the table below
details the volume of complaints (relating to North Ayrshire Council) that were referred to the SPSO
during the year: 
Type of complaint Volume
Building Control 0
Consumer Protection 0
Economic Development 0
Education 7
Environmental Health and Cleansing 2
Finance 6
Fire & Police Boards 0
Housing 14
Land and Property 0
Legal and Admin 0
National Park Authorities 0
Other 0
Personnel 0
Planning 3
Recreation and Leisure 0
Roads and Transport 1
Social Work 3
Subject unknown or Out of Jurisdiction 1
Valuation Joint Boards 0
Welfare Fund - Community Care Grants 0
Welfare Fund - Crisis Grants 0
Total 37 
• The SPSO received 1,561 complaints about Scottish Local Authorities during 2024/25 and 2.4%
related to North Ayrshire Council. This referral rate is consistent with previous years (typically
between 2% to 3%). 
• The highest number of referrals made to the SPSO about the Council related to Housing but
this was expected given many of the Local Authority referrals made to the SPSO during the year
related to Housing or housing services. 
38

Page 39

The outcomes of the North Ayrshire Council complaints referred to the SPSO are noted below. 
Stage Outcome Volume
Advice Advice & Guidance - Complaint submissions - mature 5
Advice & Guidance - Complaint submissions - premature 2
Advice & Guidance - Enquiries 3
Early
Resolution
Discretion – Good complaint handling 14
Discretion – Insufficient benefit would be achieved by investigation  5
Discretion – Referred back 3
Time limit 1
Investigation Fully upheld 0
Not duly made or withdrawn 0
Not upheld 0
Partially upheld 0 
• All referrals made by North Ayrshire complainants were resolved by the SPSO at the Advice
or Early Resolution stages. No complaints were taken to investigation. 
• Most complaint referrals handled at Early Resolution were discretionary in nature, meaning
the Council had discretion in terms of how to consider them. It is pleasing to note many were
considered ‘good complaint handling’ complaints, meaning the SPSO was satisfied with the
way the Council handled them. 
More details regarding complaint referrals for North Ayrshire Council can be found on the SPSO
website at Our findings | SPSO.  
39

Page 40

11 Glossary
Terms & Explanations
Stage One 
Stage One (also known as Frontline Resolution) aims to resolve straightforward customer
complaints that require little or no investigation. Any employee may deal with complaints at this
stage and they can be resolved via any channel. The main principle is to seek resolution at the
earliest opportunity and as close to the point of service delivery as possible. 
Stage One complaints must be responded to within 5 working days unless an extension (a
maximum of 5 additional working days) is requested and approved by a senior manager or above.
The Council should, however, always aim to resolve these types of complaints within 5 working
days.
Stage Two
Not all complaints are suitable for Stage One and not all complaints will be satisfactorily resolved at
that stage. Complaints therefore handled at Stage Two (also known as Investigations) typically
require a detailed examination before the Council can state its position. These complaints may
already have been considered at Stage One, or they may have been identified from the outset as
being complex, serious or high risk and needing immediate investigation. 
Stage Two complaints must be responded to within 20 working days unless an extension is
approved by senior manager in conjunction with the customer. Stage Two complaints require a
written response, signed by a senior manager.
Complaint criteria 
When an expression of dissatisfaction is received the Council determines if the issue falls into one
(or more) six complaint categories:
• A service the Council should be providing is not being provided or is not available
• A request for a service was provided but not to an appropriate standard 
• A request for service has not been answered or actioned within the agreed timescale
• A Council employee was rude, unhelpful or unprofessional
• A Council employee did not attend an appointment or call-out on a date/time agreed
• The complaint relates to a policy (internal or external)
If the issue being raised relates to one or more of the above, the matter is considered a complaint
and will be recorded and handled as such. If not, the matter will be handled as a request for a
service, observation or enquiry and actioned accordingly. 
40

Page 41

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    Elected Member Development 
Purpose:  To provide information and seek views on the development
sessions provided to Elected Members over the 12 months
from September 2024 to August 2025, and on future planned
development sessions. 
Recommendation:  That the Committee notes the report and provides feedback (a)
on the Elected Member Development sessions held in the
period September 2024 to August 2025 (b) on means to support
Elected Member attendance (c) on how future programmes
might be improved (d) the future development sessions
scheduled to date and (e) to suggest additional topics for the
next year. 
1. Executive Summary 
1.1 This report provides information on development support provided to Elected Members
during the period September 2024 - August 2025, on attendance rates, feedback from
current activities and on future planned development. 
2. Background 
2.1 An annual report is provided to Audit & Scrutiny which details the Council's learning
events programme for Elected Members and individual Elected Member attendance
figures.  This report provides information for the period September 2024 until August
2025 inclusive. 
2.2 The Audit Commission report on “Roles and Working Relationships - Are you still
getting it right?” emphasised that Councillors need the skills and tools to carry out their
role. This includes training in relation to both Council and ALEO responsibilities, as
well as scrutiny, audit and financial decision making. Finally, it noted that training and
development should be an ongoing process, not a one-off induction.   
2.3 North Ayrshire Council has continued to offer a full training programme for Members in
addition to e-learning and the opportunity to attend Improvement Service events and
Agenda Item 5
41

Page 42

webinars. The number of internal development sessions from September 24 – August
25 was 18 sessions.   
2.4   Appendix 1 contains details of the internal development that has taken place between
Sep 24 and Aug 25. Individual Member attendance from Sep 2024 to Aug 2025 varied
between attendance at 16 sessions to attendance at none. 
2.5   Elected members also have access to e-learning modules on the iLearn system. Take
up of this learning is low although one Councillor has completed eleven courses and
another has completed one.
2.6 Overall there were 155 separate Member attendances at development sessions
between Sep 24 and Aug 25. These figures include those aimed at specific committee
members (i.e. Appeals and Planning Committees).   
2.7   The Council offers Members an annual 1-2-1 Personal Development Plan (PDP)
discussion to discuss their development needs.  Whilst take up for this is historically
low several Members have approached Learning & Organisational Development
(L&OD) with specific requests and these have been actioned. 
2.8 Council previously agreed that all Members who sit on the Appeals Committee should
receive training before they sit on the Committee. An externally facilitated session was
held in June 2025 for three new panel Members, but open to any of the existing panel.
Four Members were in attendance; two of the new panel Members and two existing. 
2.9 Members can provide feedback by electronic means on sessions attended. For the
period Sep 24 – Aug 25 the feedback response rate was 25%. The sessions are rated
1-5 by respondents on content, presentation, friendliness of tutor, relevance and
overall service provided.  The feedback is primarily positive with only four ratings of 3
and everything else a 4 or 5. Generally training is well received with Members
confirming that their skills/knowledge has increased by attending the training. A
breakdown of the 39 evaluations received for all sessions for this 12 month period is
included in Appendix 2. 
2.10 In addition to provision offered by the Council, there is learning available from the
Improvement Service (IS) in the form of Briefing notes, masterclasses, newsletters
and more recently webinars.  Our own intranet Connects site also hosts information,
such as the slides from learning events.   
2.11 Further to Audit and Scrutiny feedback in 2023 a short survey was issued to Elected
Members.  Five responses were received.  Questions primarily related to the format of
development events, timings, pace, etc.  Based on the feedback received, Members
considered that the ideal session would be face-to-face on a Monday or Wednesday
morning lasting under 2 hours.  Where possible over the year 24-25, we have tried to
accommodate this.  Sessions generally last an hour followed by some time for
questions and answers.  Slides of the presentations are uploaded to the intranet after
each session. The breakdown of the 18 sessions by days is as follows: 
Monday – 9 
Tuesday – 2 
Wednesday – 5 
Thursday - 2 
42

Page 43

2.12 Members and Officers are consulted on future training topics and any views from the
Committee are also welcome. The Elected Member Learning and Development Event
Schedule for the latter half of 2025 is still in development and will be published in due
course.  A draft copy of the sessions already planned is included in Appendix 3. 
2.13 In conclusion, the Council continues to offer an extensive development programme for
Members. While attendance levels vary from one session to another and between
individual councillors, on average Members attend a significant volume of
development, particularly when on-line and external events are included.
Nevertheless, it is important that the Committee has the opportunity to review the
current development arrangements and suggest improvements. 
3. Proposals 
3.1 The Committee is recommended to note the report and to provide feedback a) on the
Member Development sessions held in the period September 2024 to August 2025, b)
on means to support Member attendance c) on how future programmes might be
improved d) the future development sessions scheduled to date and e) to suggest
additional topics for the next year. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Investment in development produces more informed decisions and better outcomes. As
this supports good governance and better decision making, Elected Member
development continues to be an area of focus in terms of Best Value activity. 
Human Resources 
4.2 Effective development is key to keeping North Ayrshire Council as a high performing
Council. 
Legal 
4.3 Effective development is a key component of good governance, leading to better
decisions. 
Equality/Socio-economic 
4.4 Effective equalities training is essential for Members. Training in equalities assists
Members to develop policy and inform decision making processes whilst ensuring that
appropriate equalities impacts are taken into account. 
Climate Change and Carbon 
4.5 No Implications.  
A session on Environmental Sustainability and Climate Change is planned for next year. 
Key Priorities 
43

Page 44

4.6 Sharing of information and knowledge through briefings and development sessions with
Elected Members supports the delivery of all priorities outlined in the Council Plan. 
Community Wealth Building 
4.7 There are no direct community wealth building impacts although trained and skilled
Members will be better placed to support their communities. A session on the
Community Wealth Building refresh is planned for next year. 
Islands Communities Impact Assessment (ICIA) 
4.8 Not applicable 
United Nations Rights of the Child (UNCRC) 
4.9 Not applicable 
Consumer Duty 
4.10 Not applicable 
5. Consultation 
5.1 The Learning and Organisational development team have been involved in the
preparation of this report. All sessions have been evaluated. 
Aileen Craig
Head of Democratic Services 
For further information please contact Paul Houston, Learning and Organisational
Development Adviser, on phouston@north-ayrshire.gov.uk. 
Background Papers
None 
44

Page 45

Appendix 1 - Learning & Development Attendance Sep 24 - Aug 25    
Procurement
My NAC Account 
Community Asset Transfer
Cyber Security Update 
Code of Conduct
Sustainable North Ayrshire
Ayrshire Local Resilience
Partnership
Planning Committee Training
Transformation Programme 
Ayrshire Growth Deal
AED and CPR Training
Multi Agency Response to Severe
Weather
Surveillance Camera Control Centre
Cyber Security Update
Business Recovery and Sustainability
Implementing UNCRC
Appeals Panel Training
The Equal Programme
  
Alan Hill    Y    Y     Y  Y     4
Amanda Kerr                    0
Angela Stephen                    0
Anthea Dickson  Y Y  Y Y Y Y  Y Y Y Y Y Y  Y  Y 14
Anthony Gurney    Y   Y Y  Y Y  Y   Y Y  Y 9 
Cameron Inglis  Y Y  Y Y Y Y Y Y Y Y Y Y  Y  Y  14
Charles Currie   Y Y Y  Y  Y Y     Y    7
Chloe Robertson                    0
Christina Larsen  Y  Y  Y  Y  Y      Y Y   7
Davina McTiernan  Y Y  Y Y Y Y Y Y Y Y   Y Y Y  Y 14
Donald L Reid  Y Y Y Y Y Y Y  Y Y Y Y Y Y Y Y  Y 16
Donald Reid   Y  Y Y Y Y  Y   Y Y Y  Y Y Y 12
Eleanor Collier   Y Y Y Y    Y  Y Y  Y Y Y  Y 11
Ian Murdoch  Y   Y  Y      Y       4
Jean McClung        Y            1
Jim Montgomerie                    0 
Joe Cullinane                    0 
John Bell  Y   Y  Y Y  Y Y  Y  Y Y Y  Y 11
John Sweeney     Y  Y Y  Y Y Y Y Y Y  Y  Y 11
Louise McLaughlan                    0
Margaret Johnson   Y Y         Y Y  Y Y   6
Marie Burns    Y  Y Y Y  Y     Y Y   Y 8
Mary Hume            Y   Y Y Y  4
Matthew McLean                    0
Nairn McDonald   Y                 1
Robert Foster                    0
Ronnie Stalker          Y        Y  2
Scott Davidson       Y Y            2
Scott Gallacher                    0
Shaun Macaulay                    0
Stewart Ferguson   Y      Y  Y         3
Todd Ferguson        Y      Y      2
Tom Marshall      Y              1
Totals  7 9  8  10  10  11  15  3 13 9 6 12 7 9 11 11 4 9 155 
45

Page 46

Appendix 2 – Evaluation Feedback from Sep 2024 – Aug 2025 
Note
The scale runs from 1 (Dissatisfied) to 5 (Satisfied) on all of these ratings, with the
exception being Overall which is presented as 1 (Dissatisfied) to 5 (Delighted). 
Development Session Content Presentation Tutor Relevance Overall
Has the session
increased your
knowledge and/or
skills?
2 Sept 2024 - Procurement Overview 5 5 5 5 5 Yes
2 Sept 2024 - Procurement Overview 5 5 5 5 5 Yes
2 Sept 2024 - Procurement Overview 5 5 5 5 5 Yes
30 Sep 2024 - Community Asset Transfer 5 5 5 5 5 Yes
30 Sep 2024 - Community Asset Transfer 5 5 5 5 5 Yes
30 Sep 2024 - Community Asset Transfer 5 5 5 5 5 Yes
25 Nov 2024 - Cyber Security Update 4 4 4 4 4 Yes
29 May 2024 - Cyber Update 5 5 5 5 5 Yes
25 Nov 2024 - Cyber Security Update 5 5 5 5 5 Yes
26 Nov 2024 - Code of Conduct 4 4 5 5 4 Yes
26 Nov 2024 - Code of Conduct 5 5 5 5 4 Yes
11 Dec 2024 - Sustainable North Ayrshire Strategy 5 5 5 5 5 Yes
16 Dec 2024 - Ayrshire Local Resilience Partnership Presentation on the Response to the Battery Recycling Centre fire in Kilwinning in April 20245 5 5 5 5 Yes
16 Dec 2024 - Ayrshire Local Resilience Partnership Presentation on the Response to the Battery Recycling Centre fire in Kilwinning in April 20245 5 5 5 5 Yes
16 Dec 2024 - Ayrshire Local Resilience Partnership Presentation on the Response to the Battery Recycling Centre fire in Kilwinning in April 20245 5 5 5 5 Yes
17 Feb 2025 - Council’s Transformation Programme 4 4 5 4 4 Yes
17 Feb 2025 - Council’s Transformation Programme 5 5 5 5 5 Yes
12 Mar 2025 - Ayrshire Growth Deal 5 5 5 5 5 Yes
17 Mar 2025 - AED and CPR Training 5 5 5 5 5 Yes
17 Mar 2025 - AED and CPR Training 5 5 5 5 5 Yes
17 Mar 2025 - AED and CPR Training 5 5 5 5 5 Yes
17 Mar 2025 - AED and CPR Training 5 5 5 5 5 Yes
30 Apr 2025 - Response to Severe Weather 3 3 5 3 3 Yes
31 Apr 2025 - Response to Severe Weather 5 5 5 5 5 Yes
32 Apr 2025 - Response to Severe Weather 4 4 5 3 4 Yes
12 May 2025 - Surveillance Camera Control Centre 5 5 5 5 Yes
15 May 2025 - Cyber Security Awareness 5 5 5 5 5 Yes
15 May 2025 - Cyber Security Awareness 4 4 5 4 4 Yes
15 May 2025 - Cyber Security Awareness 5 5 5 5 4 Yes
15 May 2025 - Cyber Security Awareness 5 5 5 5 5 Yes
28 May 2025 - Business Recovery and Sustainability 5 5 5 5 5 Yes
28 May 2025 - Business Recovery and Sustainability 5 5 5 5 5 Yes
9 Jun 2025 - Implementing UNCRC 5 5 5 5 5 Yes
9 Jun 2025 - Implementing UNCRC 3 4 4 3 3 No
11 Jun 2025 - Appeals Panel Training 4 4 5 4 5 Yes
26 Jun 2025 - Equal Programme: Closing the Disability Employment Gap5 5 5 5 5 Yes
26 Jun 2025 - Equal Programme: Closing the Disability Employment Gap5 5 5 5 5 Yes
26 Jun 2025 - Equal Programme: Closing the Disability Employment Gap5 5 5 5 5 Yes
26 Jun 2025 - Equal Programme: Closing the Disability Employment Gap5 5 5 5 5 Yes
5 5 Yes11 Dec 2024 - Sustainable North Ayrshire Strategy 4 5 5
46

Page 47

Appendix 3 – Elected Member Development Schedule Sep – Dec 2025 (DRAFT)
Date Topic Delivered by  Lead Comments     
6 Oct
2025
(2pm
–
3pm) 
Community
Justice – Working
together to break
the cycle of
offending
Kirsty Baker
(Partnership
Manager)
Stuart Singleton
(Planning and
Performance
Officer) 
Elizabeth
Stewart  
This session aims to raise awareness,
understanding, and confidence in using
community justice as an approach to reducing
reoffending. 
Delivered by the Community Justice Ayrshire
Partnership support team, the session will
look at a range of work being carried out by
community justice partners across Ayrshire,
including:
• Approaches to early intervention and
support for when a person first comes
into contact with the justice system
• How partners work to address the
needs of people involved in offending
behaviour whilst in the community
• Work taking place to support people
returning to our communities after a
prison sentence
22
Oct
2025
(10am
–
11am) 
Parental
Employment:
Skills for Life
Laura Neill (Senior
Manager)
Kelley Morgan
(Programme
Manager)
Louise Kirk The Parental Employment Support Team
helps parents across North Ayrshire develop
the skills, experience, and confidence needed
to secure and sustain employment. Through
our Skills for Life programme, work
placements, and the We Work for Families
programme, we provide tailored support to
overcome barriers, enhance employability,
and create pathways to fulfilling careers.
Our initiatives ensure parents can balance
work and family life while accessing training,
qualifications, and real-work experience.
Join us to explore how we can work together
to break down barriers, boost local
employment, and build stronger families and
communities.
17
Nov
2025
(2pm –
3pm)
Planning Allan Finlayson
(Senior Manager
(Planning) /
Raymond Lynch
(Senior Manager
(Legal)
Aileen
Craig
Mandatory training for elected members was
included in the Planning (Scotland) Act 2019
and North Ayrshire’s Planning and Legal
service have provided this training to Planning
Committee members. The latest opportunity
to do so again has now arrived and the
invitation to participate in training is being
47

Page 48

Date Topic Delivered by  Lead Comments
widened to all elected members. This is to
raise awareness of the Council’s National
Planning Improvement Framework which will
be subject to consultation and engagement
with all Community Councils . 
The training session will provide elected
members with an overview of the following
aspects of the Planning system in Scotland
and how this affects communities.
• An introduction to the Planning
service
• What is Planning?
• Introduction to the Council’s Planning
team
• Development Planning – the Local
Development Plan and National
Planning Framework (NPF4)
• Development Management – the
assessment of planning applications
by officers and the Planning
Committee
• Enforcement
• Other Planning roles
TBC Code of Conduct
Update 
Aileen Craig
(Head of Service
(Democratic)
Aileen
Craig 
TBC
TBC  Inclusion Process Lindsay Morris
(Executive
Manager) 
Sam
Anson 
TBC 
TBC Digital Renewal
and
Sustainability
Julia McMurdie
(Digital Renewal
Manager)
Jennifer Wraith
(Senior Manager)
Louise Kirk TBC 
TBC Ayrshire Regional
Economic
Strategy
Emma McMullen
(Senior Manager)
Louise Kirk TBC
TBC Cyber Security Gavin Alston
(Team Manager)
Fiona
Walker
TBC
48

Page 49

Date Topic Delivered by  Lead Comments
TBC Our Islands Sarah Baird
(Senior Officer)
Louise Kirk TBC
TBC New National
Islands Plan for
Scotland
Sarah Baird
(Senior Officer)
Louise Kirk TBC
TBC Community
Planning
Jacqueline
Greenlees (Senior
Manager)
David
Hammond
TBC
TBC Community
Wealth Building
Mhairi Paterson
(Economic Policy
Manager)
Louise Kirk TBC 
49

Page 50

50

Page 51

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    Accounts Commission’s Briefing: Local Government
Budgets 2025/26 
Purpose:  To inform the Audit and Scrutiny Committee of the key
messages identified within the recently published briefing. 
Recommendation:  That the Committee i) notes the key messages within the recent
Accounts Commission briefing, and (ii) notes the current
position of North Ayrshire Council in relation to the key
messages. 
1. Executive Summary 
1.1 In May 2025 the Accounts Commission published a briefing on Local Government
Budgets 2025/26. This briefing provides a high-level analysis of the 2025/26 budgets
agreed by all 32 Councils highlighting the challenges faced in achieving a balanced
budget and long-term financial sustainability. A link to the report is attached below: 
Local government budgets 2025/26
1.2  The report provides an analysis of the level of Scottish Government funding provided
to Councils, the remaining budget gaps, the steps taken by Councils to bridge these
and the ways in which Councils consulted with their communities.
1.3  Appendix 1 provides relevant North Ayrshire Council feedback on each of the key
messages identified. 
2. Background 
2.1 The briefing provides a high-level independent analysis of the budgets set by local
authorities for 2025/26, including the Councils’ Revenue, Capital and HRA budgets. This
analysis examines the sources of funding, budget gaps and identified savings required
to deliver balanced budget for 2025/26 and the projected budget gaps for 2026/27 and
2027/28. 
2.2  In addition to the financial aspects of the budgets, the briefing examines the
approaches taken to involving communities in the decision making process.
Agenda Item 6
51

Page 52

2.3 The key messages within the briefing are summarised below:
• Scottish Government revenue funding to councils increased by 6% to £15.2 billion; 
• Local government is experiencing spending pressures in excess of the funding
uplifts, including additional pressures from changes to employers’ National
Insurance contributions; 
• Councils have identified budget gaps for 2025/26 of £647 million with required
actions including increased Council Tax, identification of savings, use of reserves
and additional charges for services; 
• Further budget gaps have been identified for future years and action will be
required to achieve financial sustainability; 
• Councils must improve the accessibility and transparency of budget information
and include local communities in the choices required to address financial
challenges. 
3. Proposals 
3.1 It is proposed that the Committee i) notes the key messages within the recent
Accounts Commission briefing, and (ii) notes the current position of North Ayrshire
Council in relation to the key messages. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The Accounts Commission briefing highlights the reliance of local government on
Scottish Government grant funding and the need for further action to bridge
anticipated future funding gaps and achieve financial sustainability. North Ayrshire
Council develops medium term financial plans on a three year rolling basis and
agrees annual Revenue, Capital and HRA budgets. The financial sustainability of the
Council is monitored regularly and reported to Cabinet throughout the year. 
Human Resources 
4.2 As part of a sustainable financial strategy the Council continues to actively manage the
size of its workforce. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Equality impact assessments are carried out for all options identified as part of the
annual budget proposals. 
52

Page 53

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 In addressing the financial challenges which it faces, the Council seeks to minimise the
impact on delivering its key priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Executive Directors are consulted in the development of the Medium and Long term
Financial plans. Extensive community engagement was undertaken as part of the
development of the 2025/26 budget proposals. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
None 
53

Page 54

Appendix 1
Local Government Budgets 2025/26 
Ref Key Message NAC Feedback
K1 Scottish Government funding to local government in 2025/26 is
increasing by 6% in real terms, to £15.2 billion. However, local
government continues to face recurring pressures in excess of
funding uplifts, such as inflation, annual pay deals and growing
demand for services, and most of the increase will be used to
deliver previously agreed national commitments. Alongside this,
councils are facing additional costs related to the increase in
employer’s National Insurance contribution rates, and investing
in new buildings and assets is increasingly expensive.
The 2025/26 local government finance settlement included
additional Scottish government funding for north Ayrshire Council
of £23.666m, 6.6%. However, this included increased funding to
support a number of national pressures such as the 2024/25
council tax freeze, implementation of the Real Living Wage across
Adult and Children’s social care, prior year pay deals for local
government workers and teachers and a contribution towards the
costs of the changes to employers’ NI contributions.
The actual increase in core funding was £7.254m, an increase of
2.05%. Against this, North Ayrshire Council identified contractual
and inflationary budget pressures of £14.930m. 
K2 At a time of constrained public finances and growing demand,
not all cost increases can be met from central government
funding and councils need to take local action to achieve budget
balance over the short and medium term. At the time of setting
their budgets, councils identified a difference of £647 million
between anticipated expenditure and the funding and income
they receive (the ‘budget gap’). Councils are required to set
balanced budgets and have agreed a range of actions to
achieve this and close this gap. This includes all councils raising
council tax rates, by between six and 15.6 per cent, identifying
savings, drawing on reserves and increasing or introducing
charges for accessing some services. 
North Ayrshire Council identified a budget gap for 2025/26 of
£14.930m.
This was addressed through a range of measures including:
7% increase in Council Tax, £5.008m;
Approved savings, £3.464m;
Use of reserves, £4.000m; and
Increased Fees & Charges, £2.276m.  
K3 Councils continue to make savings across a broad range of
services to address financial challenges and have been
successful in identifying recurring measures that will help to
address underlying pressures. Despite this, councils are still
forecasting that more will need to be done in future years to
achieve financial sustainability given their projected increases in
both costs and level of service demand.
Based on current funding assumptions, including a flat cash
settlement, 5% per annum increase in Council Tax and the
programmed utilisation of reserves, the projected budget gap for
2026/27 and 2027/28 is £3.627m and £7.385m respectively,
representing a cumulative budget gap to 2027/28 of £11.012m. 
Proposals to address these gaps will be developed as part of the
2026/27 and 2027/28 revenue budget estimates. 
54

Page 55

Appendix 1
K4 Councils’ budget-setting processes vary, partly reflecting
differences in organisational structures and local priorities, and
this makes it difficult to compare information across Scotland.
There remains an underlying issue with the transparency of how
budget information is being presented.
Within their report on the 2023/24 audit, audit Scotland reported
that North Ayrshire Council demonstrated “openness and
transparency within the council together with appropriate
governance and decision-making arrangements”. It was further
noted that the Council had implemented several measures to
ensure that the decision-making processes are accessible to the
public, including the live streaming of meetings and the publication
of meeting agendas, papers, and video recordings on the council
website.
As part of the annual exercise to develop the Revenue Estimates,
officers participate in regular engagement with elected members to 
provided them with information on the financial pressures and risks
faced by the Council and the available options to reduce net
expenditure within the context of the priorities set out in the
Council Plan. 
K5 Most councils engaged communities in some way to make
decisions on their budgets for 2025/26, but there were variations
in the depth and level of this engagement. By improving the
accessibility and transparency of how they are reporting budget
information, councils can better inform and include their local
communities in making the choices required to address ongoing
financial challenges.
An extensive programme of engagement took place between 10
October and 25 November 2024 including surveys across six main
themes as well as in person and online focus groups.
This approach was designed to support our residents to contribute
their views, make the surveys more accessible and avoid digital
exclusion.
This resulted in 4,461 responses across six themes, more detailed
feedback on proposals and considerable engagement with
community groups across North Ayrshire. 
Full details of feedback across all areas were presented for
elected member consideration in advance of setting the Council
Budget. 
55

Page 56

56

Page 57

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports Issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed since May 2025. 
Recommendation:  That the Committee considers the outcomes from the Internal
Audit work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to be
put in place for the objective review of risk management and internal control.  Internal
Audit is an important element in this framework as it reviews internal controls and offers
Elected Members and officers an objective and independent appraisal of how effectively
resources are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal Audit
activity.  The submission of regular reports assists the Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed since May 2025. 
Internal control reviews have been completed in respect of the areas detailed in Appendix
A to this report. The aim of these reviews is to provide assurance that the internal control
framework within the areas examined is appropriate and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of
Service on the completion of each assignment.  Where appropriate, this has included an
action plan with recommendations for improving internal control.  Appendix A includes the
report and action plan from each audit. 
2.3 The findings from two separate audit assignments are detailed at Appendix A to this
report and the levels of assurance for each are noted in the table below: 
Audit Title Assurance Level
Procurement Substantial
Locality Planning – Community Investment Fund Reasonable 
Agenda Item 7
57

Page 58

3. Proposals 
3.1 It is proposed that the Committee notes the outcomes from the Internal Audit work
completed since May 2025. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic priorities
within Our Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
58

Page 59

Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.  
59

Page 60

PROCUREMENT 
1 Background  
1.1 The audit entailed an independent review of procurement activities in conjunction with
the requirements of the PCIP (Procurement and Commercial Improvement
Programme) external assessment to ensure good practice.  
1.2 
1.3 
1.4
Consequently, the review focussed on the arrangements in place for ensuring that
contract awards are compliant with internal governance and legislative requirements. 
CPU offers advice on procurement related matters such as contract terms, contract
extensions, contract modifications and price increase requests. CPU also lead the
management of modifications and extensions to the contract as required by the terms
and conditions, and national procurement legislation. In-addition, CPU progress all
procurements over £10k except for national framework direct awards up to £50k that
the service teams can progress themselves. 
Internal service teams are responsible for the management and monitoring of contract
and supplier performance against specification, terms and conditions and KPIs. Also,
internal service teams will obtain updated documentation following expiry dates for
insurances, accreditations and memberships. 
2 Objectives and Scope  
2.1 The main objective of this audit was to carry out an independent procurement review to: 
• Ensure standing orders are being applied to contracts procured across all
Council services and followed for a competitive, fair, transparent process to
optimise competition and value for money.
• Obtain evidence that independent post project reviews are routinely carried out
for high risk or high value procurements with lessons documented for future
projects. 
2.2       The period covered by the audit is 1st January 2024 to 31st March 2025   
3 Findings 
Procurement application of Standing Orders 
3.1  The Council’s Procurement manual and Standing Orders relating to Contracts set out
the process for awarding a contract, depending on the different types of procurement
procedure that must be followed, for the different thresholds of spend. These
procedures are detailed in section 7 (Low Value Procurement) and section 8 (High
Value Procurements). Contracts can be procured via framework call offs, tenders,
quick quotes, and single tender actions.  
3.2  A sample of 10 contracts consisting of supplies, services and works across different
Council services with total spend greater than £50,000, all appointed within the last 12
months, including the 5 highest value, were reviewed to assess if the procurement
procedures complied with the Procurement Manual and Standing Orders. 
60

Page 61

3.3 
The contracts reviewed generally complied with the Council’s Procurement manual
and Standing Orders in the areas of Request for Procurement Action (RPA), contract
strategies, evaluations, publication and award process such as tender outcome
report, award and decline letters. 
3.4  In one of the jobs examined, we observed that there was no evidence that the officers
involved had completed the iLearn Module on Standing Ordering Relating to
Contracts and Contract Procedure Rules, which is mandatory for all budget holders,
and anyone involved in the procurement process. Budget holders are required to
confirm, via a checkbox on the RPA, that the training has been completed however in
this case, it had been left blank. This was not challenged by the CPU on receipt of the
RPA.  (action a).  
3.5 We reviewed the most current procurement manual and observed that the procedures
did not adequately incorporate all of the relevant activities relating to procurement as
actual practices sightly differ from process in the following areas: 
• Procurement fraud impact assessment must be completed for all procurements
over 10K (Supplies, Services and Works) as seen in the contract files
reviewed, whereas this process is not incorporated in the procurement manual.
• Information Sharing Protocol is part of the actual process as seen in the
contract files reviewed whereas this process is not incorporated in the
procurement manual. 
The current procurement manual has been updated at the suggestion of the
auditor during the audit.  
Post Project Review  
3.6  All of the sample contracts had completed and documented a post project review. 
Most of the reviews had identified learning points, either negative or positive, but in a
couple of cases N/A had been recorded, indicating that no learning points had been
identified.     
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the procurement of major
contracts.  The contracts reviewed generally complied with the Council’s
Procurement Manual and Standing Orders in the areas of Request for Procurement
Action (RPA), contract strategies, evaluations, publication and award process such
as tender outcome report, award and decline letters.  One action to improve the
quality of compliance with procedures has been recommended.           
61

Page 62

Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
62

Page 63

KEY FINDINGS AND ACTION PLAN
PROCUREMENT 
Action a
Finding In one of the jobs examined, we observed that there was no
evidence that relevant officers had completed the iLearn Module
on Standing Ordering Relating to Contracts and Contract
Procedure Rules, which is mandatory for all budget holders, and
anyone involved in the procurement process. The field within the
RPA to confirm that training had been completed was left blank.
Action Description CPU should always challenge service teams when instances of
non-compliance are identified, such as failing to confirm that the
iLearn Module had been completed. 
Risk Non-compliances with Standing Orders or procedures are not
identified and corrected.  Lack of adequate knowledge of
procurement process will hamper effective contributions of
participants. 
Priority (1, 2, 3) 2
Paragraph Reference  3.4
Managed by Mark Boyd, Head of Service (Finance)
Assigned to Suzanne Bignell, Senior Manager (Corporate Procurement)
Due Date Completed
Management Comment CPU Managers have been instructed to challenge any service
representative that has not stated if they have completed the
CSO I-Learn training. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
63

Page 64

LOCALITY PLANNING – COMMUNITY INVESTMENT FUND 
1 Background  
1.1 The Community Investment Fund (CIF) was created to support projects that address
local priorities.  
1.2 Community organisations apply for CIF funding via their Locality Partnership. 
1.3 Locality Partnerships are responsible for assessing proposals and making funding
recommendations to Cabinet.  
1.4 £1.85m of this Fund remains unallocated (as per the most recent Cabinet paper,
dated 18th February 2025). 
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• there is a robust process for assessing and awarding CIF 
• Documentation to evidence the assessment and award process is being
retained
• Monitoring of actual spend is being undertaken 
3 Findings   
Assessment Process  
3.1 The Council has a guidance note that sets out the CIF scheme criteria, grant
eligibility and an outline of the process for developing and approving an award. 
3.2 The current approach for assessing and documenting funding decisions is as
follows:- 
1. Expression Of Interest template – completed by applicants and gives a broad
outline of the proposal
2. Expression Of Interest checklist – used by Locality Officers to ensure the
proposal meets the CIF criteria
3. Partnership meeting – the proposal will be discussed and a decision will be
made to either reject it, request amendments/additional information or request
a full application be submitted.  The decision is recorded in the Partnership
Action Note.
4. Application template – completed by applicants.  This is a much more detailed
document and requires the applicant to answer a number of key questions,
including:-
a. Summary of proposal
b. What difference will this project make within the locality and to local
services and programmes?
c. What engagement has taken place in relation to the project?
d. How will the project be managed?
e. Amount of funding being requested
f. Monitoring and evaluation process
64

Page 65

5. Partnership meeting – to discuss the application form and either reject it,
request amendments/ additional information or agree the application should
be presented to Cabinet to request funding.  The decision is recorded in the
Partnership Action Note.
6. Cabinet meeting – to discuss the application form and either reject it, request
amendments/additional information or approve CIF funding.      
3.3 Audit reviewed the above process and documents in detail and has recommended
the following improvements:-
• Updating the guidance note to make the submission of supporting
documentation a mandatory part of the application process.  These
documents evidence that the applicant meets the CIF criteria (action a)
• Updating the Expression of Interest checklist to include confirming the
applicant has sufficient public liability and employers’ liability insurance
(action b) 
• the introduction of a funding agreement to be signed by applicants prior to the
receipt of funds. (action c)     
Evidence of decision-making process  
3.4 Audit selected 1 award made by each of the 6 Localities and requested evidence of
stages 1-6 as documented in 3.2 above.  
3.5 The Service was unable to locate:-
• The Expression of Interest checklists and corresponding supporting
documentation for 4 of the awards
• An action note showing the recommendation to move from the Expression of
Interest to full application stage for 1 award  
3.6 The Service indicated that staffing changes have contributed to issues with locating
some of the above documents.  The Service and Audit agreed that a standardised
filing system would make mitigate this issue. (action d)   
Monitoring of Spend  
3.7 Locality Officers are in regular contact with award recipients and are therefore aware
of the general progress of projects.    
3.8 The Service also requires award recipients to complete a monitoring template every
12 months.  The template requests:-
• information on actual spend, including copies of invoices
• an update on progress towards project outcomes  
3.9 Audit requested copies of monitoring forms and evidence of spend for each of the 6
awards tested at 3.4 above.  
3.10 1 award had been made less than 12 months ago, and therefore a monitoring form
wasn’t yet due.  All other 5 had been awarded more than 12 months ago, and so
monitoring reports should have been submitted. 
3.11 Audit found 3 forms had been submitted approximately 12 months after the payment
date, 2 had been submitted approximately 2 years after the payment date. (action e)  
3.12 Audit also reviewed the evidence of spend submitted alongside each monitoring
report.
65

Page 66

3.13 Audit found:-
• 2 awards where invoices to fully evidence the CIF spend had been submitted
• 2 awards where documents had been submitted, but these were not invoices
and therefore not sufficient evidence of spend
• 1 award where no invoices had been submitted (action f)  
3.14 In addition to the monitoring form, the Service indicated that over the last few years
applicants have been invited to Partnership meetings to provide an update on their
project. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard the award of CIF funding.  
4.2 Standardising and centralising the filing of CIF related documents will ensure all
evidence to support awards can be located.  This will also help to identify any gaps
in evidence more easily. 
4.3 The Service is currently working on improving the award monitoring process, which
should address the issues raised above. 
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
66

Page 67

KEY FINDINGS AND ACTION PLAN
LOCALITY PLANNING – COMMUNITY INVESTMENT FUND 
Action a
Finding The CIF Guidance Note currently states:-
‘Where appropriate, depending on the grant sum requested, the
organisation will be expected to submit supporting
documentation. All documentation will be used, alongside the
application form, to assess against the grant criteria.’ 
Action Description Guidance should be updated to make the submission of
documentation to prove eligibility for CIF funding mandatory. 
Officers should enforce this at the Expression of Interest stage
(as per the Expression of Interest checklist), with funding
requests not advancing to the application stage until all relevant
documentation has been provided.
Risk Insufficient information to confirm if the applicant meets the CIF
scheme criteria; inappropriate awarding of CIF funds
Priority (1, 2, 3) 2
Paragraph Reference  3.3
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Jacqueline Greenlees/Angela Morrell
Due Date 31st August 2025
Management Comment Guidance updated; training for officers to take place August
2025 
Action b
Finding Expression Of Interest checklist does not cover all CIF scheme
criteria.
Action Description Checklist should be updated to ensure it references all criteria of
the scheme.
Risk Applicant that doesn’t meet the scheme criteria receives a CIF
award
Priority (1, 2, 3) 2
Paragraph Reference  3.3
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Jacqueline Greenlees
Due Date 30th June 2025
Management Comment Guidance updated 
Action c
Finding Successful applicants are not currently required to sign a
funding agreement.
Action Description With support from Legal, a funding agreement should be created
for all CIF awards.  This should include the need to comply with
monitoring requirements and the requirement to be able to
evidence ‘best value’.
Risk No recourse if the award is not spent in line with approved
application; no recourse if monitoring requirements are not
adhered to; poor use of the public pound 
Priority (1, 2, 3) 1
Paragraph Reference  3.3
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Jacqueline Greenlees
67

Page 68

Due Date 30th September 2025
Management Comment Will be implemented by time next funding is agreed at Locality
Partnerships. 
Action d
Finding The Service was unable to locate CIF related documents.
Action Description A standardised filing system should be introduced and used by
all Officers. 
Risk Important documents can’t be located; unable to evidence
decisions if challenged 
Priority (1, 2, 3) 2
Paragraph Reference  3.6
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Angela Morrell
Due Date 30th September 2025
Management Comment A standardised filing system will be implemented. 
Action e
Finding Monitoring templates are not always being submitted timeously. 
Action Description The timing of the issuing of the monitoring template should be
changed. 
Providing the template when the award is paid gives the
recipient plenty of time to review the form, raise any early
queries and complete the form as they spend.   
Reminders could be sent to ensure recipients are aware that the
return will be due at 12 months.
Risk Service is unaware of the misuse of the CIF award
Priority (1, 2, 3) 2
Paragraph Reference  3.11
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Jacqueline Greenlees/Angela Morrell
Due Date 30th September 2025
Management Comment Template will be provided with award letter. 
Action f
Finding Unsuitable documents are currently being accepted as
‘evidence’ of spend. 
Action Description The Service should remind Officers that only invoices can be
accepted as evidence of spend.   
Officers should reconcile both the detail and total value of
invoices submitted to the spend breakdown in the monitoring
form. 
Risk Service is unaware of the misuse of the CIF award
Priority (1, 2, 3) 2
Paragraph Reference  3.13
Managed by Rhonda Leith, Head of Service (Connected Communities)
Assigned to Angela Morrell
Due Date 30th September 2025
Management Comment Officer training to take place in August 2025. 
68

Page 69

Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
69

Page 70

70

Page 71

NORTH AYRSHIRE COUNCIL 
28 August 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit and Corporate Fraud Action Plans: Quarter 1
Update 
Purpose:  To advise the Audit and Scrutiny Committee on the progress made
by Council Services in implementing the agreed actions from
Internal Audit and Corporate Fraud reports as at 30 June 2025. 
Recommendation:  That the Committee (a) notes the current position with the
implementation of Internal Audit and Corporate Fraud actions; and
(b) challenges those Services that have not implemented actions
within the previously agreed timescales. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in Scotland' highlights
that Audit Committees should monitor and review the progress made in implementing audit
recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising from Internal
Audit and Corporate Fraud reviews are implemented. This provides assurance that identified
control weaknesses have been addressed and are being managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are responsible for
updating Pentana as they progress each action. This enables Internal Audit to monitor
progress on a 'real-time' basis and address any delays in implementation. 
1.4 This report details the position as at 30 June 2025. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 29 May 2025 highlighted that there
were 4 actions outstanding at the end of March 2025 and all 4 actions had not yet passed
their due date. 
2.2 In addition to these 4 carried forward actions, there have been 26 new actions agreed, giving
a total of 30 action points for review. 
2.3 Services have completed 16 actions since the last report. All Council Services are required
to retain evidence of work carried out in completing their actions and Internal Audit carries
out 'spot-checks' on a sample of completed actions on an ongoing basis. 
Agenda Item 8
71

Page 72

2.4 Of the remaining 14 actions, one was only partially completed as at 30 June 2025 and the
remaining 13 actions were not due for completion until after that date. 
2.5 Appendix 1 to this report provides the Committee with full details of the one action that was
not completed within the agreed timescales. 
3. Proposals 
3.1 It is proposed that the Committee (a) notes the current position with the implementation of
Internal Audit and Corporate Fraud actions; and (b) challenges those Services that have not
implemented actions within the previously agreed timescales. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud actions helps to
support the efficient delivery of the strategic priorities within the Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
72

Page 73

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit and Corporate
Fraud review and have also provided updates on progress made in implementing action
points. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud, Safety,
Risk & Insurance), on 01294 324607. 
Background Papers
None. 
73

Page 74

Appendix 1 - Actions due by 30 June 2025 but not started or partially completed 
Code IA2025PA005c Description
Action Description:
An SLA should be developed between Housing, HSCP, Building Services and PMI
services which outline the agreed arrangements for managing additional charges.
The reasons for additional charges should be recorded and subsequently approved
by HSCP management.  
Finding: 
A review of jobs completed revealed instances where the final invoice amounts were
higher than the agreed amount for the jobs as keyed into the Building Services URM
system. On further examination of the cases identified, we found that no further
approval had been obtained from a senior OT, or Service Level Agreement (SLA)
put in place between HSCP and Building Services, to support the additional
charges.  
Risk:
Unauthorised financial expenditure or inability to properly monitor budget due to
unplanned expenditure.
Priority 2 Latest Note  SLA awaiting final sign off by all partners. Circulation of SLA expected to take place
imminently to allow for final agreement and sign off. Target completion date 30/9/25. 
Progress Bar  Original Due Date 30-Apr-2025 Due Date 30-Apr-2025
Parent Code & Title IA2025PA005 Aids and Adaptations
Managed By Yvonne Baulk; Sharon
Hackney
Assigned To Stephen Connor; Beth
Griffin 
74