North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Meeting of the Audit and Scrutiny Committee of North Ayrshire Council will be
held in the Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12
8EE on Thursday, 29 May 2025 at 10:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the Meeting of the Audit and Scrutiny
Committee held on 13 March 2025 will be confirmed and the Minutes
signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973 (copy enclosed). 
3 Update on purple bin lids
Submit report by the Executive Director (Place) providing an update on
the actions taken to resolve the issues experienced with purple bin lid
defects (copy enclosed). 
4 Code of Corporate Governance Statement 2025/26
Submit report by the Head of Service (Democratic) seeking approval of
Code of Corporate Governance Statement 2025/26 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 Audit Scotland: North Ayrshire Council Best Value Thematic
Management Report: Transformation
Submit report by the Head of Service (Finance) on the findings of the
recent Audit Scotland report on how councils are redesigning and
delivering more efficient services to achieve planned outcomes (copy
enclosed). 
6 2023/24 External Audit Action Plan Update
Submit report by the Head of Service (Finance) on the updated actions
identified in the 2023/24 External Audit Action Plan (copy enclosed). 
7 Annual Governance Statement 2024/25
Submit report by the Head of Service (Finance) on the Council’s Annual
Governance Statement for 2024/25 which will be included within the draft
Annual Accounts (copy enclosed). 
8 Accounting Policies 2024/25
Submit report by the Head of Service (Finance) seeking approval of the
accounting policies which will be adopted in the preparation of the
Council’s Annual Accounts for the year to 31 March 2025 (copy
enclosed). 
9 Strategic Risk Register 2025/26
Submit report by the Head of Service (Finance) on the Council’s agreed
Strategic Risk Register for 2025/26 (copy enclosed). 
10  Internal Audit Annual Report 2024/25
Submit report by the Head of Service (Finance) on the work of Internal
Audit during 2024/25 and providing an opinion on the governance, risk
management and internal control environment of the Council (copy
enclosed). 
11  Corporate Fraud Team Annual Report 2024/25
Submit report by the Head of Service (Finance) on the work of the
Corporate Fraud Team during 2024/25 (copy enclosed). 
12  Internal Audit and Corporate Fraud Action Plans: Quarter 4 Update
Submit report by Head of Service (Finance) on the progress made by
Council Services in implementing the agreed actions from Internal Audit
and Corporate Fraud reports as at 31 March 2025 (copy enclosed). 
13  Internal Audit Reports Issued
Submit report by the Head of Service (Finance) on the findings of Internal
Audit work completed since March 2025 (copy enclosed). 
14  Standing Item of Business: Consideration of future business for
scrutiny
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
15  Urgent Items
Any other items which the Chair considers to be urgent.  
Webcasting  
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.    
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.    
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.    
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Eleanor Collier
Cameron Inglis
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney 
Chair: 
Apologies: 
Attending: 
4

Page 5

Audit and Scrutiny Committee
13 March 2025 
At a Meeting of the Audit and Scrutiny Committee of North Ayrshire Council at 10.00
a.m. involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation)
John Bell, Eleanor Collier, Cameron Inglis, Davina McTiernan, Donald L. Reid and
John Sweeney. 
Present (Remote Participation)
Donald Reid 
In Attendance (Physical Participation)
D. Hammond, Executive Director (Communities and Housing); Kerry Logan, Head of
Service, (Health and Community Care) (Health and Social Care Partnership); 
R. McCutcheon, Executive Director, M. McNeil, Senior Manager (Waste Resources)
(Place); A. McClelland, Head of Service, C. Hope, Senior Manager (Facilities
Management) (Education); M. Boyd, Head of Service, D. Forbes, Senior Manager
(Strategic Business Partner), J. McCallum, Senior Manager (Audit, Fraud, Safety
and Risk) (Finance); F. Walker, Head of Service , J. Smillie, Senior Manager (People
Services), F. Carlyle, Team Manager (HR), E. Nixon, Senior Manager (Customer
Services) (People and ICT); R. Lynch, Senior Manager (Legal Services) and H.
Young, Senior Committee Services Officer (Democratic Services) (Corporate
Services). 
Also in Attendance (Physical Participation)
D. Jamieson and F. Mitchell-Knight Audit Scotland. 
Chair
Councillor Bell in the Chair. 
Apologies
Tom Marshall 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order 11
and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of (i) the Ordinary Meeting of the Audit and Scrutiny Committee held on
23 January; and (ii) the Special Meeting held on 6 February 2025 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973. 
Agenda Item 2
5

Page 6

3. Sickness Absence Management 
Submitted report by the Head of Service (People & ICT) on the Council’s Sickness
Absence policies and how these are managed, monitored and reported. 
The Wellbeing@Work Supporting Attendance Policy was set out at Appendix A,
Maximising Attendance Policy (Teachers) set out at Appendix B, Wellbeing@Work
Supporting Attendance Policy Management Prompts set out at Appendix C,
Maximising Attendance Policy (Teachers) Triggers  set out at Append D, Absence
Targets set out at Appendix E, Directorate Summary – Absence at 2024/25 set out at
Append F and the Local Government Benchmarking Framework set out at Appendix
G to the report. 
Officers were heard in response to Members’ questions. 
The Committee agreed to a further report detailing the impact of sickness absence
levels on the overtime budget of services and loss of service. 
Noted. 
4. Accounts Commission’s Report: Local Government in Scotland:
Financial Bulletin 2023/24 
Submitted report by the Head of Service (Finance) informing the Committee on the
findings of the recently published report with the feedback on each of the key
messages identified set out at Appendix 1 to the report. 
Noted. 
5. Internal Audit Plan 2024/25: Progress Update 
Submitted report by the Head of Service (Finance) requesting approval for an
amendment to the 2024/25 Internal Audit Plan set out at Appendix A to the report. 
The Committee agreed to (a) note the factors affecting the completion of the Internal
Audit Plan; and (b) approve the deferral of one audit set out at Appendix A to the
report. 
6. Internal Audit Reports Issued 
Submitted report by the Head of Service (Finance) informing on the findings of
Internal Audit work completed since January 2025 
Officers were heard in response to Members’ questions. Noted. 
7. Internal Audit and Corporate Fraud Action Plans: Quarter 3 update 
Submitted report by the Head of Service (Finance) on the progress made by Council
Services in implementing the agreed actions from Internal Audit and Corporate
Fraud reports as at 31 December 2024.  Appendix 1 to this report provides the
6

Page 7

Committee with full details of the three actions that were not completed within the
agreed timescales. 
Officers were heard in response to Members’ questions. 
The Committee agreed to (a) note the current position with the implementation of
Internal Audit and Corporate Fraud actions; and (b) challenge Services that have not
implemented actions within the previously agreed timescales. 
8. Internal Audit Charter 2025 
Submitted report by the Head of Service (Finance) on the updated Internal Audit
Charter set out at Appendix A to the report. 
Officers were heard in response to Members’ questions. 
The Committee agreed to (a) note the changes in Internal Audit standards and that
the requirements have been incorporated into the Internal Audit Charter where
necessary,  (b) note the inclusion of the Integrated Joint Board within the scope of
the Internal Audit Charter,  (c) approve the Internal Audit Charter set out at Appendix
A to the report, and (d) future amendments to the Charter will be made where a need
is identified. 
9. Internal Audit Plan 2025/26 
Submitted report by the Head of Service (Finance) on the proposed internal audit
plan for 2025/26 with the internal audit plan for quarter one and two of 2025/26 set
out at Appendix A and a list of potential audit areas set out at Appendix B of the
report. 
The Committee agreed to approve the internal audit plan for 2025/26. 
10. External Audit Plan 2024/25 
Submitted report by the Head of Service (Finance) on the External Audit Plan for
2024/25 with Audit Scotland’s Annual Audit Plan for the 2024/25 audit set out at
Appendix 1 to the report. 
Officers were heard in response to Members’ questions. Noted. 
11. Standing Item of Business: Consideration of Future Business for
Scrutiny 
Members were invited to consider potential items of scrutiny business for future
meetings. 
The Committee noted the request from Councillor Donald Reid for a report on
supplier and quality issues of purple bin lids and the replacement process to be
brought to Audit & Scrutiny. 
7

Page 8

12. Urgent Items 
There were no urgent items. 
The meeting ended at 11.30 a.m. 
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home 
8

Page 9

NORTH AYRSHIRE COUNCIL  
29 May 2025 
Audit & Scrutiny Committee
Title: Update on purple bin lid issues
Purpose: To update the Audit & Scrutiny Committee on the actions taken
to resolve the issues experienced with purple bin lid defects.
Recommendation: Audit and Scrutiny Committee notes the progress made. 
1. Executive Summary 
1.1 As part of the Council’s implementation of a three weekly collection scheme for
kerbside domestic waste collections, an additional bin was provided to residents to
recycle their cans, glass and plastic containers. This involved the provision of some
61,750 purple bins to every household on the mainland and Cumbrae. A few months
into implementation, quality issues were identified by residents with repairs and
replacement lids required for their purple bins. This only affected certain batches. 
1.2 Arrangements were made with the supplier for replacement, non faulty lids to be
received. 
1.3 A significant number of service requests have been received from residents which have
required the Waste Operations team to respond to by delivering and fitting replacement
lids. 
2. Background 
2.1 In April 2019, North Ayrshire Council implemented a three weekly collection cycle for
kerbside domestic waste collections. As part of this a new purple bin was provided to
residents for their cans, glass and plastic. A few months into implementation, quality
issues were identified by residents with repairs and replacement lids required for the
purple bin lid only. This only affected certain batches. 
2.2 Meetings were held with the supplier of the bin lids and the contract administrator,
Scotland Excel, to try and resolve this issue. The issue related to a tooling design fault
which was rectified by the supplier. 
2.3 Agreement was reached with the supplier, including the supplier fixing faulty bin lids
and the supplier providing free bin lids and bins to the Council as compensation for the
disruption caused. A tooling design fault was rectified by the supplier during the
manufacturing process to prevent the issue recurring. 
2.4 This matter was raised at full Council on 15 May 2024 and at that time 5,400 purple
bins lids had been repaired with 1,529 repairs outstanding. Waste Services provided a
Agenda Item 3
9

Page 10

commitment to resolve the outstanding repairs as soon as possible. 
2.5  Following a request from the Audit and Scrutiny Committee on 21 March 2024, during a
debate on the mid-year complaints report, an online facility for residents to report purple
bin lid faults was developed and launched in June 2024. 
2.6 The online reporting facility has proven to be effective, however, has resulted in a
significant number of duplicate requests of already reported faults. This necessitated a
data cleanse to remove duplicate requests. 
2.7 A significant number of new cases were reported following Storm Eowyn in late
January 2025. This extraordinary high level of cases increased pressure on the team to
repair or replace the bin lids. However, despite this, significant progress has been
made in clearing the backlog and dealing with new cases. 
2.8 A recent review was carried out at the start of this year into processes and
arrangements in place to respond to the ongoing issue with the provision of
replacement purple bin lids, which resulted in operational tweaks to improve service
response times. These have now been in operation for a number of weeks with
significant progress made in responding to outstanding and new service requests. 
2.9 An update on the number of purple bin lids repaired and outstanding, at the time of
writing the report, is as follows: 
Number of cases reported:  11,336
Number of repairs carried out: 10,561
Number of outstanding repairs:      775 
2.10 Continued good progress is anticipated and will be reported verbally during the meeting. 
3. Proposals 
3.1 It is proposed the Committee notes the update provided on the number of purple bin lid
repairs that have been attended to and that arrangements are in place to address the
outstanding and newly received repair requests. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
10

Page 11

Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 None. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 None. 
RUSSELL McCUTCHEON
Executive Director (Place) 
For further information please contact Thomas Reaney, Head of Service (Neighbourhood
Services), 01294 310000. 
Background Papers
0
11

Page 12

12

Page 13

NORTH AYRSHIRE COUNCIL 
29th May 2025 
Audit and Scrutiny Committee 
Title:    Code of Corporate Governance Statement 2025/26 
Purpose:  To seek approval of Code of Corporate Governance Statement for
the Financial Year 25/26 
Recommendation:  That the Audit and Scrutiny Committee agrees to: (a) Review
and approve the Code of Corporate Governance Statement
2025/26. 
1. Executive Summary 
1.1 This report provides details of how we ensure good governance, including clear
accountability for delivering the desired outcomes for service users and communities.
Appendix 1 provides our Code of Corporate Governance Statement 2025/26. 
2. Background 
2.1 All local authorities have a statutory requirement to report publicly on the extent to which
they comply with their own Code of Governance on an annual basis, including how they
have monitored and evaluated the effectiveness of their governance arrangements in
the year and considered planned changes in the coming period. 
2.2. The ‘Delivering Good Governance in Local Government Framework’ (CIPFA/Solace
2016) applies to annual governance statements.  It helps local government take
responsibility for developing and shaping an informed approach to governance and aims
to achieve the highest standards in a measured and proportionate way.  The Framework
is intended to assist authorities individually in reviewing and accounting for their own
unique approach. 
2.3. The overall aim is to ensure that: 
• Resources are directed in accordance with agreed policy and according to
priorities.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in order to achieve
desired outcomes for service users and communities. 
Agenda Item 4
13

Page 14

2.4. Appendix 1 contains our Code of Corporate Governance Statement 2025/26 which
aligns to the Framework and demonstrates how we are ensuring good governance and
transparent accountability. 
3. Proposals 
3.1 The Audit and Scrutiny Committee is requested to (a) Review and approve the Code
of Corporate Governance Statement 2025/26.   
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None.   
Environmental and Sustainability 
4.5 None.   
Key Priorities 
4.6 Effective governance is key to delivering our priorities outlined within our Council Plan
2023-28, specifically the Sustainable Council priority. 
Community Wealth Building 
4.7   None. 
5. Consultation 
5.1 The Executive Leadership Team were involved in the creation of the Code of
Corporate Governance.
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Hardy, Senior Manager (Policy, Performance
and Democracy) on 01294 324035. 
Background Papers
None.
14

Page 15

Code of Corporate
Governance 2025 to 2026 
15

Page 16

Code of Corporate Governance 2025 to 2026  Page 1 of 14
Delivering Good Governance in Local Government 2025 to 2026
This document details how North Ayrshire Council complies with the Delivering Good Governance in
Local Government: Framework (CIPFA/Solace, 2016). 
The Framework supports local government to take responsibility for developing and shaping an informed
approach to governance, aimed at achieving the highest standards in a measured and proportionate way.
It assists authorities individually in reviewing and accounting for their own unique approach. The overall
aims ensure: 
• Resources are directed in accordance with agreed policy and according to priorities.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in order to achieve desired
outcomes for our service users and communities. 
The Framework applies to annual governance statements prepared for the financial year 2016/17
onwards. 
For further information please contact: 
The Corporate Policy and Performance Team
North Ayrshire Council
Tel: 01294 310000
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk 
16

Page 17

Code of Corporate Governance 2025 to 2026  Page 2 of 14
A. Behaving with integrity, demonstrating strong commitment to
ethical values and respecting the rule of law
Demonstrating strong commitment to ethical values
• New Elected Members are provided with a full Induction Programme which includes all aspects of
conduct. There is an extensive programme of inductions at the outset of the new Council
Administration. Thereafter, sessions are provided on a regular basis. 
• All Elected Members have access to Continuing Professional Development discussions and the
opportunity to participate in self/360 assessments to review and support their ongoing development.
In addition to this, a series of development events is provided to further support Elected Members’
Development. A calendar of events on a variety of topics is arranged and promoted to Elected
Members. Online guides and e-learning are also available.
• All employees including Chief Officers participate in ‘Our Time to Talk’ discussions which provide the
opportunity to discuss the focus of work, how this will be done (behaviours linked to our Staff Values)
and what development is required to support this. This is an annual discussion which can be supported
throughout the year by one-to-one supervision discussions and a mid-year review as required.
• The Council invests in leadership and management development by hosting a Leadership Academy.
This provides aspiring, first, middle and strategic leaders, including Chief Officers and Elected
Members, with a variety of development interventions which enhance, refresh and develop their skills,
knowledge and behaviour.
• There is a Code of Conduct for Employees.
• The Code of Conduct for Councillors sets out the minimum standards of conduct that are expected
from Elected Members and provides advice and guidance on registerable interests and on the
declaration of interests. The Code also sets out the sanctions that can be applied by the Standards
Commission where a breach of the Code occurs. Elected Members are provided with quarterly
updates from the Standards Commission and Advice Notes issued by the Commission to assist in
compliance with the Code of Conduct are communicated.
• The Local Government Act 2000 and the Code of Conduct for Councillors set out the categories of
interests, financial or otherwise, that Councillors of Scottish Local Authorities must register. This
register is available for inspection by members of the public. In compliance with the Act and relevant
Regulations, the 33 Elected Members of North Ayrshire Council have registered interests with the
Proper Officer of the Council. The Register of Interests and notifications of Declarations of Interest are
available for inspection. Reports on Elected Member Training are submitted to the Executive
Leadership Team (ELT) and to the Audit and Scrutiny Committee on an annual basis.
• The Council has approved Guidelines for Member/Officer Relations (incorporating the Protocol on
Member/Officer Relations from the Councillors’ Code of Conduct). This is subject to annual review as
part of the Council’s review of governance documents.
• Declaration of Interest is a set item on all Council and Committee Meeting Agendas. There is a
requirement for all Elected Members, to declare any financial or non-financial interests in accordance
with the Code of Conduct.
• There is a Whistle Blowing policy in place for employees, which was reviewed in 2020, again in 2022 in
line with accessibility requirements and a minor accuracy update in 2023. 
• A Media Protocol is in place. 
17

Page 18

Code of Corporate Governance 2025 to 2026  Page 3 of 14
• The People Strategy, “Our People Connect”, was designed by our employees for our employees. This
outlines priorities that will engage and support the transformation of the Council to be a leaner, more
efficient and higher performing organisation where people can develop and thrive. 
• Our Staff Values of Focus, Passion and Inspiration are key to our People Strategy “Our People
Connect”. They are now fully embedded in everything we do each day and visible when logging onto a
laptop or desktop, poster or wall displays, lanyards etc. In addition to this they are embedded in our
recruitment process, onboarding process and throughout our development interventions (such as
courses and “Our Time To Talk” discussions). 
Respecting the rule of law
• Strategic decision-making is governed by the Council’s key constitutional documents which are subject
to regular review. The governance documents were approved by Council in May 2022 and reviewed in
May 2023, September and December 2024 and are scheduled for review in September 2025. The key
documents are the Scheme of Administration, The Standing Orders for Meetings and Proceedings of
the Council, the Standing Orders relating to Contracts and Contract Procedure Rules and the Scheme
of Delegation to Officers. 
• The Council’s Cabinet is the key strategic decision-making committee, comprising the Leader of the
Council, the Depute Leader and four Members of the Administration.
• The roles and responsibilities of the Council’s Audit and Scrutiny and Appeals Committees are set out
in the approved Scheme of Administration.
• The Head of Service (Finance) is appointed as the Section 95 Officer and is responsible to the authority
for the proper administration of financial affairs as stated within the Local Government (Scotland) Act
1973.
• The Head of Service (Democratic Services) is appointed as the Monitoring Officer.
• The Head of Service (Democratic Services) is appointed as RIPSA Senior Responsible Officer (SRO). The
SRO ensures compliance with the terms of The Regulation of Investigatory Powers (Scotland) Act 2000
(RIPSA) and associated legislation.
• The Chief Social Work Officer is appointed in accordance with Section 3 of the Social Work (Scotland)
Act 1968.
• The Council has appointed a Chief Planning Officer.
• The Head of Service (Education) is appointed as Chief Education Officer in anticipation of the
commencement of Section 25 of the Education (Scotland) Act 2016.
• The Revised Remuneration Policy Guidance is in place.
• The Counter Fraud and Corruption Strategy is in place. 
• A Data Protection Officer (DPO) is appointed. The DPO ensures compliance with the General Data
Protection Regulation (2018) and the Data Protection Act (2018) legislation. 
18

Page 19

Code of Corporate Governance 2025 to 2026  Page 4 of 14
B. Ensuring openness and comprehensive stakeholder engagement
Openness
• Our Council Plan 2023 to 2028 was approved by Council on 21st June 2023 and sets out our strategic
approach to making North Ayrshire a fairer and more equal society. This sets out our vision, mission
and four priorities up to 2028.
• We have 26 Council Plan Performance Indicators to ensure that progress on the Council Plan is
managed and scrutinised. Targets have been set where appropriate for each of the indicators to
ensure we can monitor progress of our priorities. Progress on the Council Plan is also scrutinised
through the half yearly Council Plan Progress Reports sent to the ELT, Cabinet and the Audit and
Scrutiny Committee. These are published on the performance pages of our website. In addition,
summary reports are scrutinised by the ELT at Quarter 1 and Quarter 3.
• Council Plan actions are high-level five-year actions as listed within the Council Plan 2023 to 2028 and
are supported by relevant strategies.
• The Council’s Annual Performance Report provides a summary of our performance during the year and
is available on our website.
• Financial information including annual accounts is published on our website.
• Our Annual Governance Statement is approved annually by the Audit and Scrutiny Committee and
published on our website.
• Our Performance Management Strategy 2023 to 2028 aligns to our Council Plan and is published on
our website. It outlines current procedures and planned activities to drive continuous improvement
for the people of North Ayrshire.
• Links to My Local Council website are published which provide our residents with Local Government
Benchmarking Framework (LGBF) performance information and comparisons to other local
authorities. Information on our performance within the LGBF is integrated within our suite of public
performance reporting as part of our six-monthly Council Plan Mid-Year and Year-End Progress
Reports.
• There is a presumption that all committee business is open to the public except where required by law
to be in private. Council/Committee meetings which are open to the public are also live streamed to
the internet and/or available to view as a recording following the meeting. Since 2020 both Council
and Committee meetings have been streamed live with recordings available for viewing thereafter.
The Council meeting in September 2022 agreed that “hybrid meetings” should be the default position
for meetings whereby some Members attend the meeting in person and others may join remotely.
This improves accessibility and participation. A hybrid meetings protocol is in place and subject to
regular review.
• Through our commitment to the Community Empowerment (Scotland) Act 2015, the Council’s
Community Planning website has been developed to share information and research about the work
of the Community Planning Partnership, Locality Planning, our key aims and objectives and align with
the requirements of the Act.
• The Council has separate schemes for reporting complaints and compliments, as well as customer
feedback for the Health and Social Care Partnership.
• Two complaint reports are submitted to the Audit and Scrutiny Committee each year and trends or
issues fed back to services to identify improvements. Complaint handling performance is also recorded
19

Page 20

Code of Corporate Governance 2025 to 2026  Page 5 of 14
regularly in Pentana. The Council has a dedicated Complaints Manager who supports Chief Officers,
Senior Managers, Elected Members as well as complaint handlers and acts as liaison with the Scottish
Public Services Ombudsman.
• All inspection reports are reviewed by Cabinet and the Audit and Scrutiny Committee.
• The Council’s Publication Scheme and guidance on submitting Freedom of Information and
Environmental Information requests are available on the Council’s website.
• Guidance on submitting Subject Access Requests is available on the Council’s website.
• Open Data is published on the Council’s Open Data Portal, allowing members of the public to access
information on various council services ranging from information such as location of libraries to
performance related matters such as contact centre call performance.
• Elected Members have access to data on Pentana on request allowing them to view progress of the
Council Plan indicators.
Engaging comprehensively with institutional stakeholders
• The Council is committed to engaging in a meaningful way with its communities so that it can
understand and respond effectively to local needs and is committed to the principles of the National
Standards on Community Engagement.
• The Community Planning Partnership hosts the Council’s Participation Strategy, developed jointly with
partners, and showcasing the range of opportunities for communities to engage in various
mechanisms to support Council decision making.
• The Council is committed to supporting the establishment and work of Community Councils and their
role in Locality Partnerships as well as supporting Locality Planning in its own right as the Council’s
scheme of decentralisation. The Scheme of Establishment for Community Councils will be reviewed
during 2025/26.
• The Community Planning Partnership website contains The Engagement Hub and a consultation
calendar which brings all partner consultations together in a searchable format and gives feedback on
consultations.
• The Community Engagement Network of the Community Planning Partnership has been refocused and
aims to ensure partners meet the revised National Standards for Community Engagement.
• The North Ayrshire Health and Social Care Partnership Integration Joint Board (IJB) is the governing
body of the North Ayrshire Health and Social Care Partnership. It has delegated responsibilities from
North Ayrshire Council and NHS Ayrshire and Arran.
Engaging with individual citizens and service users effectively
• Engagement and consultation are at the heart of the Community Planning Partnership and is driven
through the Engagement Centre of Excellence Programme which includes training, digital resources,
and links to key strategies and approaches. For example, the Youth Participation and Citizenship
Strategy, Older People’s Forum and Community Engagement Network are all key examples of this
work. There is now an online ‘Engagement Hub’ on the Community Planning website, comprising of an
online engagement list, events calendar, community and partner resources and information about the
CPP’s Participation Approach.
• The Council routinely engages with our residents on our services and proposals. The Council recently
undertook a large budget consultation exercise which elicited some 4,461 responses to help inform
20

Page 21

Code of Corporate Governance 2025 to 2026  Page 6 of 14
budget setting proposals.  The views of our communities are also gathered through consultation with a
range of groups such as Parent Councils, Youth Forums, Tenants Associations, Community Associations
and networks and the Access Panel. 
• The ongoing development of Locality Partnerships has made Community Planning more accessible to
local people.
• Increased use of social media through Locality Facebook pages, the Community Planning Partnership X
account and partner use of Community Planning hashtag supports communication with a wider
audience.
• Participatory Budgeting is an approach to deepening engagement with residents which delivers real
influence for individuals and communities and the Council has made significant commitment and
investment in this work. 
• The North Ayrshire Community and Locality Planning Model extends and deepens engagement with
individuals and participation by communities by: co-defining the issues; co-producing the responses;
and co-delivering the solutions.
• We currently use the Consul application to run Shaping North Ayrshire, our online participation forum
enabling residents to provide feedback on current topics.
• Application of the Place Standard enables individuals and communities to express how it feels to live in
local communities and to shape the development of community and spatial planning in their area.  
21

Page 22

Code of Corporate Governance 2025 to 2026  Page 7 of 14
C. Defining outcomes in terms of sustainable economic, social, and
environmental benefits 
Defining outcomes
• The Council’s vision and mission outlined in Our Council Plan 2023-28 links strongly to the North
Ayrshire Community Planning Partnership’s (CPP’s) shared vision of ‘North Ayrshire – A Better Life’.
• Our Council Plan 2023 to 2028 was approved by Council in June 2023. Our vision and mission in Our
Council Plan are: 
o Vision: ‘A North Ayrshire that is fair for all’
o Mission: ‘Working together to improve the lives of our people in North Ayrshire’
• Our Council Plan has four interlinked and interdependent priorities:
o Wellbeing – to transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
o Communities and Local Democracy – we will have active, inclusive and resilient communities.
o Climate Change – to achieve net zero by 2030.
o A Sustainable Council – a Community Wealth Building Council that is efficient and accessible,
maximising investment and focusing resources towards our priorities.
• The role of the Audit and Scrutiny Committee and ELT/ Chief Officers Leadership Team is to scrutinise
the findings from the various performance reports. We regularly report on the following to ensure
effective scrutiny:
o Locality Outcome Improvement Plan (LOIP) Progress Reports.
o Locality Partnership progress reports.
o Council Plan Progress Reports - six monthly reports to Cabinet and the Audit and Scrutiny
Committee.
o Council Plan Annual Performance Report.
o Local Government Benchmarking Framework.
• As part of the recent self-evaluation work undertaken by the Audit and Scrutiny Committee, a standing
agenda item to cover areas which the Committee would like to have addressed has been added to the
committee agendas.
• We utilise the Pentana online performance management system to track and manage Council
priorities and measures.
• The Council Plan Performance Management Framework (PIs) is reviewed regularly. The Council Plan
actions are as published within the Council Plan 2023 to 2028 and are high level actions over five
years. They are supported by strategies within the Council.
• Operational Plans are prepared and reviewed on an annual basis.
• Strategic risks and control factors are reported to Cabinet.  
22

Page 23

Code of Corporate Governance 2025 to 2026  Page 8 of 14
Sustainable economic, social and environmental benefits
• Our Local Outcomes Improvement Plan’s clear focus has been agreed by Community Planning partners
across themes of Wellbeing, Work and World with an overarching focus on reducing inequalities and
working in partnership.
• Our Council Plan priorities ‘Wellbeing’ and ‘Climate Change’ link to a range of actions supporting a
wellbeing economy, as well as performance indicators such as carbon emissions and amount of energy
generated from low carbon sources.  
• The Climate Change Steering Group is established to drive activity in delivering the Climate Change
Council Plan priority.  Comprising senior management representatives from each Council Directorate,
Community Planning Partners, private sector and other agencies, with meetings taking place every
four months.
• The Community Wealth Building Strategy has been refreshed for 2024 to 2027 and is available on our
website. Community Wealth Building is central to our Council Plan 2023 to 2028.
• The Sustainable North Ayrshire Strategy 2024 to 2027 is established.
• The North Ayrshire Nature Network Strategy is in place, as is the Local Biodiversity Action Plan (2019
to 2031).
• Our Economic Development, Growth and Regeneration priorities are identified and delivered through
a range of strategies including our Regeneration Delivery Plan 2021 to 2026, Vacant and Derelict Land
Strategy 2023 to 2027 and Local Transport and Active Travel Strategy 2023 to 2028.
• The Annual Climate Change Reporting Duty is submitted to Scottish Government.
• Our Children’s Services Planning includes our Children’s Rights Report and our Child Poverty Action
Plan 2023 to 2026. Our Children’s Services Plan outlines our aims and priorities to safeguard, support
and promote the well-being of children and to make North Ayrshire the best place in Scotland to grow
up. Our Children’s Rights Report emphasises our commitment to promote and protect children and
young people’s rights in line with the UN Convention on the Rights of the Child (UNCRC). Our Child
Poverty Action Plan takes account of the actions we are taking with partners to address child poverty
in North Ayrshire. Progress is reported to the Community Planning Partnership Board.
• Our Education Service Improvement Plan 2023 to 2026 aims to improve the educational outcomes for
all learners, particularly those who are most disadvantaged.
• Our committee report template includes a requirement to evaluate equality, socio-economic and
climate change impacts to ensure these are embedded within our decision-making processes. 
• The Council is committed to using the Local Government Benchmarking Framework (LGBF)
Performance Indicators to scrutinise performance on our priorities against all local authorities within
Scotland.
• The Housing and Public Protection Service complies with the Scottish Regulators Strategic Code of
Practice. The integrated regulatory functions within the service (Building Standards, Environmental
Health and Trading Standards) can demonstrate an effective contribution towards the Council’s
approach to sustainable economic growth as well as maintaining and promoting a prosperous, fair and
safe society. 
23

Page 24

Code of Corporate Governance 2025 to 2026  Page 9 of 14
D. Determining the interventions necessary to optimise the
achievement of the intended outcomes 
Determining interventions 
• The information submitted to Committees is discussed in detail at ELT to ensure management
oversight and thereafter at pre-Agenda meetings (except in the case of regulatory committees) that
are held one week prior to the formal meetings. This enables any additional information to be sought
to allow a fully informed decision to be taken at the Committee. 
• Each report should indicate the justification for each action proposed and consultations undertaken in
its development, together with feedback from consultees. Reports also contain separate sections on a
range of implications (financial, human resources, legal, socio-economic duty including the consumer
duty and island impacts, equality including children and young people’s rights, Community Wealth
Building and the Council’s key priorities). Guidance for report authors provides information on the
completion of these elements within the required fields in a committee report.
Planning interventions
• Council Plan six monthly progress reports.
• Operational Plan reports to Heads of Service and Executive Directors.
• Use of Pentana online performance management system allows us to ensure we are achieving
acceptable levels of performance, identify opportunities for continuous improvement and ensure we
have plans in place to improve underperforming areas.
• Council and Operational Plan performance reports contain trend information on Performance
Indicators.
• Strategic risks and control factors are reported to Cabinet.
• The Risk Management Strategy is in place and available on our website.
• The Community Planning Partnership Risk Register has been reviewed to reflect the refreshed Local
Outcomes Improvement Plan 2022 to 2030.
• The Workforce Strategy (2024 to 2028) has been refreshed in 2024, this explains how our workforce
will support the delivery of the Council’s ambitions within the available financial resources and builds
on the workforce planning approach carried out at a service level. 
• ‘Our approach to Workforce planning’ HR guide is published on our intranet to support managers and
Heads of Service in shaping their current and future workforce to ensure delivery of efficient and
effective services and is a significant factor in how we transform our Council to deliver our financial
challenges. In order to be successful, it is key for workforce planning to flow from the Council Plan and
link to both people management and operational processes.  
• Long Term Financial Outlook – The Council’s Long-Term Financial Outlook outlines the financial
challenges facing the Council over the next 10 years and is reported to Cabinet. 
• Medium Term Financial Plan – The Council’s Medium-Term Financial Plan provides an overview of the
Council’s anticipated financial position for the next three financial years. This is approved by Council
annually. A copy of the budget book is published on our website each year.
24

Page 25

Code of Corporate Governance 2025 to 2026  Page 10 of 14
• Capital Investment Programme – The Council’s Capital Investment programme provides an overview
of the capital projects the Council is investing in over the 10-year period and associated funding
sources. The 10-year Capital Investment Programme is reviewed and approved by Council annually. 
• Capital Investment Strategy – The Council’s Capital Investment Strategy provides an overview of how
capital investment plans, financing and treasury management activity contribute to the infrastructure
and provision of services for the benefit of North Ayrshire communities and citizens. 
• Asset Management Plans are in place. 
Optimising achievement of intended outcomes
• Regular reporting of financial performance to Cabinet.
• Production of annual accounts and publication on our website.
• Local Financial Returns. 
25

Page 26

Code of Corporate Governance 2025 to 2026  Page 11 of 14
E. Developing the entity’s capacity, including the capability of its
leadership and the individuals within it 
Developing the entity’s capacity 
• The Leadership Academy provides skills, knowledge and behavioural development for leaders at all
levels. Managers regardless of grade can, if committed to their continuous learning and supported by
their manager, progress through the levels of the Leadership Academy from First to Strategic utilising
development opportunities and accessing tailored interventions for career progression. This provides
an opportunity to build leadership capacity and grow our own talent.
• The Connected Leadership Network is an active Teams channel which provides an opportunity for
senior managers to gain support from others as well as sharing knowledge, ideas and suggestions. This
has been a successful addition to the Leadership Academy and supports the digital agenda.
• The Chief Officer Leadership Team (COLT) meet on a quarterly basis to provide an opportunity to
collaborate on key priorities aligned to the Council Plan.  
• The Chief Executive hosts a Connected Leadership Conference three times per year. This provides an
opportunity for sharing of information and increased engagement and collaboration opportunities
with other managers to deliver our Council Plan priorities.  Themes are then continued through Chief
Officer Leadership Team sessions and Connected Leadership information sessions to enrich the
knowledge gained and give further opportunities to work together and drive improvements. 
Developing the capability of the entity’s leadership and other individuals
• Each employee has a Role Profile which provides information on the expectations of the job. This
supports the development of skills, knowledge and behaviours of our employees.
• All governance documents including the Scheme of Delegation to Officers and the Financial
Regulations documents are reviewed annually and published on our website. 
• All employees throughout the Council participate in “Our Time To Talk” discussions which provide the
opportunity to discuss the focus of work. It ensures managers and employees take time, at least once
per year, to reflect and most importantly ’TALK’ about how the employee is getting on at work. This is
an annual discussion which can be supported throughout the year by one-to-one/supervision
discussions and a mid-year review as required.
• New Elected Members are provided with a full Induction programme which includes all aspects of
Council business, such as overview of Council meetings, introduction to the ELT and the role of the
councillor. 
• A series of development events are provided to further support Elected Members’ Development. A
calendar of events on a variety of topics is arranged and promoted to Elected Members, in addition to
online guides and e-learning.
• Elected Members are invited to participate in an annual development discussion in addition to an
opportunity to participate in self/360 assessment. This allows identification of development activity to
support their role and provides feedback on their individual performance utilising the 360 tool.
• The Community Planning Partnership’s Community Learning and Development Plan contains
leadership development. 
26

Page 27

Code of Corporate Governance 2025 to 2026  Page 12 of 14
F. Managing risks and performance through robust internal control
and strong public financial management
Managing risk
• The Strategic Risk Register is refreshed annually, approved by Cabinet and subject to a six-month
progress update. A Corporate Risk Register is refreshed annually, approved by the ELT and also subject
to a six-month progress update. Operational Risk Registers are updated by services six-monthly. There
are escalation and de-escalation processes in place between the registers.
• The Corporate Risk Management Group, with senior representation from all Directorates, meets six-
monthly to review and update risks and their associated risk management action plans. Other related
business will also be considered where this could enhance the organisational risk posture.
• The Community Planning Partnership Risk Register was revised in 2022 to align with the Local
Outcomes Improvement Plan 2022-30.
Managing performance
• Council Plan Progress Reports are scrutinised by the ELT, Cabinet and the Audit and Scrutiny
Committee. The reports are produced in a ‘magazine style’ format to make the information as
engaging and accessible as possible. 
• Performance indicators (including targets where appropriate) and actions are included within the
Council Plan Performance Framework and Council Plan. All updates to the framework are detailed
within the six-monthly Progress Reports and reported to ELT, Cabinet and Audit and Scrutiny for full
transparency.
• The six-monthly Council Plan Progress Reports focus on outcomes as well as ongoing activity and
outputs. Case studies alongside information on audits, inspections and accreditations are included to
show how we are performing. Benchmarking activity takes place via the Local Government
Benchmarking Framework (LGBF) indicators included in the Performance Management Framework
and those that link directly to our priorities are scrutinised quarterly by ELT and through our six-
monthly reporting for Cabinet and the Audit and Scrutiny Committee.  This ensures we learn from
others and continually improve. Links are provided within the reports to additional information where
appropriate. This holistic approach provides a well-rounded view of performance within our Council
that includes valuable context.
• The six-monthly Council Plan Progress Reports (Quarters 2 and 4) which include LGBF comparisons, as
well as the Annual Performance Report are published on our website. Scrutiny is invited from
residents and contact information is contained in the reports.
• Operational Plans within services align directly to the Council Plan and are scrutinised by relevant
Senior Managers and Heads of Service.  
27

Page 28

Code of Corporate Governance 2025 to 2026  Page 13 of 14
• Benchmarking activity is undertaken based on the Local Government Benchmarking Framework (LGBF)
as well as through specific groups. In addition to quantitative comparisons, outcome-based
benchmarking also takes place.
• Our Performance Management Strategy 2023-28 is published on our website and aligns to Our Council
Plan 2023-28.
Robust internal control
• The Council has a framework of Internal Controls embedded within services, underpinned by Financial
Regulations and Codes of Financial Practice which are approved by the Council.
• Internal Audit establishes an annual risk-based plan of work to review controls across the Council. This
is approved by the Audit and Scrutiny Committee and is subject to a mid-year review process.
• All audit findings are reported to the Council’s Audit and Scrutiny Committee.
• The Council has a Corporate Fraud Team which investigates all allegations of fraud and error against
the Council. Six-monthly update reports are provided to the Audit and Scrutiny Committee. Regular
review of the Counter Fraud and Corruption Strategy is undertaken, with the most recent review
taking place in September 2022.
• An annual report and assurance statement is provided by the Chief Internal Auditor to the Audit and
Scrutiny Committee.
• An annual report on RIPSA is provided to ELT and Cabinet and we provide an annual statistical return
on use of investigatory powers to the Investigatory Powers Commissioner’s Office (IPCO).
• A governance structure was implemented by the three Ayrshire Councils in 2018 to oversee the
delivery of the Ayrshire Growth Deal (AGD) and promote the objectives of the Ayrshire Regional
Economic Partnership. This comprises the Ayrshire Growth Deal Project Management Office (PMO)
which reports directly to the Chief Executives Group, Ayrshire Economic Partnership Group and Joint
Committee, with the Ayrshire Economic Partnership Board sitting below the Joint Committee and
having responsibility for the day-to-day business of the partnership and AGD.
Managing data
• The Council’s Records Management Plan (RMP) was approved by the Keeper of the Records of
Scotland in 2015. As defined by the Public Records (Scotland) Act 2011, the Council undertake Progress
Update Reviews and submit to the Keeper to monitor compliance. 
• The Council maintains an Information Asset Register (IAR) which is kept under regular review.
• The Council has a process for undertaking Data Protection Impact Assessments (DPIA) with approval
required from DPO and annual reviews embedded to ensure compliance with Article 35 of the UK
GDPR. 
28

Page 29

Code of Corporate Governance 2025 to 2026  Page 14 of 14
G. Implementing good practices in transparency, reporting and audit
to deliver effective accountability
Implementing good practice in transparency
• We publish our public facing reports on our website.
• Committee Reports and webcast recordings are on our website.
• There is a presumption that all committee business is open to public except where required by law to
be in private.
• We publish open datasets.
Implementing good practices in reporting
• Annual Governance Statement.
• Six monthly Council Plan Progress reports and Annual Performance Reports produced, with updates to
accompanying Performance Management Framework reported in detail to the ELT, Cabinet and the
Audit and Scrutiny Committee.
• Community Planning Partnership Annual Performance Report.
• Health and Social Care Partnership Annual Performance Report.
• Annual Accounts demonstrates best practice according to external auditors.
Assurance and effective accountability
• The Annual Governance Statement is approved by the Audit and Scrutiny Committee prior to inclusion
within the annual accounts.
• Any recommendations by External Audit are reported to the Audit and Scrutiny Committee and
progress with implementation is monitored by Internal Audit and also reported to the Committee on a
bi-annual basis.
• Internal Audit work is reported to the Audit and Scrutiny Committee on a quarterly basis.
• The Council’s Internal Audit Team received an independent External Quality Assessment in July 2022
which demonstrates conformance with the Public Sector Internal Audit Standards. This needs to be
carried out at least every five years, with period self-assessments also carried out by the Chief Internal
Auditor.
• The Chief Auditor has rights of access to the Chief Executive and the Chair of the Audit and Scrutiny
Committee in relation to any audit matter.
• The Data Protection Officer has direct rights of access to the Chief Executive and Chief Officers in
relation to any personal/sensitive data protection matters. 
29

Page 30

30

Page 31

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee 
Title:    Audit Scotland: North Ayrshire Council Best Value
Thematic Management Report : Transformation 
Purpose:  To present the findings of the recent Audit Scotland report on
how councils are redesigning and delivering more efficient
services to achieve planned outcomes 
Recommendation:  Note the report findings and the recommended improvement
actions 
1. Executive Summary 
1.1 The Accounts Commission’s “Local government in Scotland Financial bulletin 2023/24”
notes that councils need to intensify transformation activity, progressing at scale and
pace to ensure their financial sustainability. 
1.2 Audit Scotland carried out the Best Value Audit earlier in the year. This report covers
the thematic aspect of the Best Value audit requirements. The Accounts Commission
has directed auditors to report on transformation and how councils are redesigning and
delivering more efficient services to achieve planned outcomes. 
1.3 The full report findings are attached in the appendix of the report. This includes
recommended areas of improvement actions which have been agreed by senior council
officers. Audit Scotland representatives will be in attendance at the committee to present
the findings. 
2. Background 
2.1 The Accounts Commission’s “Transformation in councils” report recognises that, while
work has been ongoing in relation to local government transformation for decades, a
step change is required and the pace and scale of transformation must increase
significantly. Transformation, through greater collaboration with partners, will be key for
councils to deliver more sustainable service models in challenging financial climates. 
2.2 Audit Scotland carried out the Best Value Audit earlier in the year. The audit covers
the thematic aspect of the Best Value audit requirements. The Accounts Commission
has directed auditors to report on transformation and how councils are redesigning
and delivering more efficient services to achieve planned outcomes. In carrying out
the work, auditors have considered the following questions:
Agenda Item 5
31

Page 32

• To what extent does the council have clear plans for transformation that link to its
priorities and support long-term financial sustainability? 
• To what extent do the council’s programme management arrangements facilitate
effective oversight of its transformation plans? 
• To what extent are partners and communities involved in the development and
delivery of the council’s plans for transformation? 
2.3 The report findings are attached within the appendix of the report, including
recommended areas of improvement actions. Representatives from Audit Scotland will
be in attendance to present the findings. 
3. Proposals 
3.1 Members are asked to note the report findings and the recommended improvement
actions. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None 
Legal 
4.3 None 
Equality/Socio-economic 
4.4 None 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The Best Value Thematic Audit aligns to the Council’s Key priority of a Sustainable
Council 
Community Wealth Building 
4.7 None 
32

Page 33

5. Consultation 
5.1 Audit Scotland engaged with various council officers throughout the course of the audit. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Finance, on 01294 324560. 
Background Papers
0
33

Page 34

North Ayrshire
Council
Best Value thematic management report 
Transformation: how councils are redesigning and
delivering more efficient services to achieve planned
outcomes 
Prepared by Audit Scotland
May 2025
34

Page 35

Best Value thematic work:  | 2 
Contents 
Key messages 3
Introduction 5
Transformation planning 8
Programme management 13
Partnership working and community engagement 15
Impact of transformation 19
Appendix 22 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
35

Page 36

Key messages | 3 
Key messages 
1 The Accounts Commission’s Local government in Scotland Financial bulletin
2023/24 notes that councils need to intensify transformation activity,
progressing at scale and pace to ensure their financial sustainability. 
2 In 2024 we reported that North Ayrshire Council’s underlying service cost
base is not sustainable and reserves will be depleted over the longer term
unless future recurring savings are made through the transformation of its
services and other measures. 
3 The council’s current transformation programme, known as its Sustainable
Change Programme, was approved in 2023 and clearly sets out how it
intends to transform its services, in line with its priorities, through five
workstreams and six service reviews. Between 2021/22 and 2024/25 the
council achieved financial efficiencies from its Sustainable Change
Programme of £3.136m. It plans to make further efficiencies of £8.5m over
the next three years.
4 The council’s latest Medium Term Financial Outlook has identified a structural
funding gap of £46.7m in the three-year period to 2027/28 (including HSCP
pressures). Projected savings from transformation fall significantly short of the
savings required. Officers are clear that future recurring savings also need to
be made through workforce changes, cuts in services, and council tax and
fees and charges increases. However, the transformation programme needs
to be sufficiently ambitious to respond to the scale of the financial challenges.
5 The council has robust officer-led governance arrangements in place to
monitor its Sustainable Change Programme through its Transformation
Board. The Executive Leadership Team are all members of the
Transformation Board and so are well-sighted on the council’s transformation
projects. However, there is scope for the council to improve its public
reporting on transformation to provide assurance about how the council plans
to change, to sustain services in the future. 
6 The council has a well-established and well-resourced transformation team. It
has a Change and Service Redesign Fund - an investment fund created by
36

Page 37

Key messages | 4 
the council more than eight years ago to help drive transformation. Nearly
£0.8m has been drawn down from the Fund in the last two years although not
all of this has been spent on transformation.
7 The council has shared examples of where it is working well with partners to
deliver transformation with the aim of generating savings and improving
outcomes, but its current transformation programme is primarily internally
focused. There is scope for the council to consider opportunities for more
radical transformational change with partners. 
8 There are discussions ongoing across the senior leadership of North
Ayrshire, East Ayrshire and South Ayrshire Councils to explore further
opportunities for public sector reform and collaboration including the Ayrshire
Economic Strategy. These developments will be subject to scrutiny by elected
members as they progress. Elected members will need to make difficult
decisions on how the use of limited resources is prioritised going forward.
Plans need to be innovative and ambitious.
9 The council has provided good examples of consulting with its communities in
relation to transformation projects and using the results to influence how
services are delivered. The recent extensive budget engagement process
included consultation with residents on many activities overseen by the
Transformation Board. 
10 The council provides regular and detailed information on the financial and
non-financial benefits of individual transformation workstreams and service
reviews to the Transformation Board. The benefits of individual projects are
also reported in individual council reports.  
11 The council has provided evidence of using Equality and Children’s Rights
Impact Assessments in relation to its transformation projects, where
appropriate, and has provided examples of engagement with user groups
leading to changes being made in how services are delivered.
37

Page 38

Introduction | 5 
Introduction 
1.  Transformation is about radically changing how councils operate and
deliver services to achieve planned outcomes in a financially sustainable
way (Transformation in councils, Accounts Commission, October 2024).
The 2023 Local Government Overview (LGO) notes that councils have
never faced such a challenging situation. Service demands have
increased after the Covid-19 pandemic and funding is forecast to reduce in
real terms. 
2.  The Accounts Commission’s Transformation in councils report
recognises that, while work has been ongoing in relation to local
government transformation for decades, a step change is required and the
pace and scale of transformation must increase significantly.
Transformation, through greater collaboration with partners, will be key for
councils to deliver more sustainable service models in challenging
financial climates.
3.  This report sets out how the council is redesigning and delivering more
efficient services to achieve planned outcomes. It builds on what we have
reported previously in this area in our 2023/24 Annual Audit Report.  
4.  The Accounts Commission’s Strategy (2021-26) sets out its priorities to
focus on inequalities, funding, communities and recovery. The Code of
Audit Practice sets out the Best Value work required to report on these
priorities. 
5.  This report covers the thematic aspect of the Best Value audit
requirements. The Commission has directed auditors to report on
transformation and how councils are redesigning and delivering more
efficient services to achieve planned outcomes. In carrying out the work,
auditors have considered the following questions: 
• To what extent does the council have clear plans for transformation
that link to its priorities and support long-term financial
sustainability?
• To what extent do the council’s programme management
arrangements facilitate effective oversight of its transformation
plans?
• To what extent are partners and communities involved in the
development and delivery of the council’s plans for transformation?
38

Page 39

Introduction | 6 
• To what extent has the council considered the impact of its
transformation activity, including on vulnerable or protected
groups?  
6.  An improvement action plan is included at Appendix 1 of this report.
This sets out audit recommendations in key areas, and the council’s
planned response including responsible officers and dates for
implementation.
7.  The coverage of the work is in line with the expectations for council’s
arrangements for the seven Best Value themes in the Local Government in
Scotland Act 2003, Best Value Statutory Guidance 2020 and we have
considered the Accounts Commission’s transformation principles set out in
Transformation in councils (Exhibit 1). 
39

Page 40

Introduction | 7 
Exhibit 1
Transformation principles
Transformation is about radically changing how councils operate and deliver services to achieve
planned outcomes in a financially sustainable way.
Principle  
Vision
Have a clear vision that sets out the intended end state of any transformation
activity, focused on: 
• delivering large-scale recurring savings or generating income for the council,
contributing to its longer-term financial sustainability
• improving outcomes for citizens in line with council priorities
• taking a whole-system approach to see and realise opportunities both within
councils and more widely
• meeting the needs of the people who use services and reduce inequalities
• focusing on preventative activity, where applicable, to reduce the demand for
services and to make them sustainable in the longer term.
Planning
• Be clear on the scale of the change required and ensure transformation plans
are sufficiently ambitious to credibly respond to the scale of the challenge.
• Commit staff with appropriate skills, time, and resources to ensure
transformation occurs at the scale and pace required and that there is enough
capacity for the changes to be embedded.
• Be clear about the timescales, costs, outcomes, and anticipated impacts of
transformation projects.
• Show urgency and progress projects at pace without compromising
appropriate governance on projects.
Governance
• Have a clear process for monitoring, evaluating, and reporting progress.
• Put in place effective governance and escalation processes so that the
transformation activities are well managed in their own right, but also able to
be given priority alongside other business-as-usual activities. 
Collaboration 
• Develop better working relationships with communities and/or partners to
achieve a sustainable model of service delivery.
• Actively consider the opportunities offered by regional or national sectoral
collaboration, or by integrating services locally with partners, or by supporting
individuals and communities to achieve desired outcomes in place of an
existing service.
• Learn from good practice across Scotland and beyond.
Innovation 
• Implement new ways of thinking, including innovation, creativity and a desire,
willingness, and action to change and do things in new and different ways that
achieve the outcomes needed.
• Embed the right culture and behaviours to manage change and help maximise
the contribution of all the team.  
Source: Accounts Commission, Transformation in councils, October 2024
40

Page 41

Transformation planning | 8 
Transformation planning 
8.  The council needs to ensure it can deliver sustainable services now and
in the future, and difficult decisions will need to be made to achieve this.
The Accounts Commission’s Local government budgets 2024/25 briefing
noted that councils’ cumulative funding gap between 2025/26 and 2026/27
is £780 million. This means that, cumulatively, councils need to identify
and deliver recurring measures such as savings or increased income of
five per cent of their overall revenue budget to be financially sustainable in
the short term. 
9.  In January 2025, the Accounts Commission advised in its Local
government in Scotland Financial bulletin 2023/24 that councils need to
intensify transformation activity, progressing at scale and pace to ensure
their financial sustainability and how councils plan to use their reserves,
make savings and transform their services needs to become more
transparent. 
10.  The council’s latest Medium Term Financial Outlook (MTFO) for the
period 2025/26 to 2027/28 was presented to the council in October 2024. 
It identified a number of specific financial challenges in relation to the
availability of Scottish Government funding for local authorities, the impact
that anticipated demographic profile and other demand and cost pressures
will have on the council’s cost base, and the strategies available to
address the resultant funding gap. 
11.  The MTFO identifies a structural funding gap of £46.7m (including
HSCP pressures) which must be addressed as part of the council’s
Medium-Term Financial Plan. 
12.  In February 2025, the council agreed a balanced budget for 2025/26
but only after approving a council tax increase of seven per cent (£5.0m)
and using: 
• a further £4.0m of reserves;
• further savings across Directorates of £4.809m, including new
approved savings of £2.547m, operational budget adjustments of
£2.254m and previously approved savings of £0.008m;
• non-recurring savings of £9.5m relating to the reduction in employer
pension fund contributions;
• a previously approved 100 per cent council tax premium in respect
of second homes (£1.3m); and
41

Page 42

Transformation planning | 9 
• a revised policy for non-domestic rates empty property relief
(£0.253m).
13.  The council’s latest Medium-Term Financial Plan indicates budget
shortfalls of £3.6m in 2026/27 and £7.4m in 2027/28 (excluding HSCP
pressures) after the planned use of reserves totalling £3.5m in 2026/7 and
£1.8m in 2027/28. This is after assuming the council will fund a maximum
three per cent increase in staff pay and council tax increases of five per
cent for the next two years. The current planning assumption by the
council for years 2026/27 and 2027/28 is that financial pressures facing
the HSCP will be met by savings and recovery actions. However, the IJB’s
total estimated budget gap for 2026/27 and 2027/28 ranges from a best-
case scenario of a £11.6m deficit to a worst-case scenario of a £27.6m
deficit. This position represents a material risk to the financial sustainability
of the council.
14.  Financial efficiencies from the Sustainable Change Programme of up
to £8.5m are planned from 2025/26 to 2027/28. However, these fall
significantly short of the savings required to achieve financial balance and
will only be part of the council’s solution to closing its funding gap. The
underlying service cost base is not sustainable and reserves will be
depleted over the longer term unless further recurring savings are made
through transformation of services, service reduction, service withdrawal
and income generation. 
42

Page 43

Transformation planning | 10 
Findings Evidence
The council’s
transformation programme,
known as its Sustainable
Change Programme, clearly
sets out how it intends to
transform its services in
line with its priorities
through five workstreams
and six service reviews. 
The council is clear that the
primary driver behind its
transformation programme
is the need to deliver
financial savings to
address the council’s
financial challenges and
protect frontline services.
There are strong links
between transformation
and the council’s financial
plans and transformation is
included in the council’s
risk register. 
• The council’s current transformation programme, known as
its Sustainable Change Programme, was approved in 2023
and consists of five workstreams and six service reviews. 
• The council is clear that the primary driver behind its
transformation programme is the need to deliver financial
savings to address the council’s financial challenges.
• The current workstreams in the Sustainable Change
Programme are sustainability, non-commercial property,
commercial property, digital, developing data assets and
the tourist visitor levy. Each of these workstreams contain
multiple transformation projects. 
• All five workstreams and six service reviews have clear
links with the council’s priorities. For example, its digital
programme is linked to its Wellbeing, Communities and
local democracy and A Sustainable Council priorities. 
• There is a dedicated section in the council’s annual budget
documents on the Sustainable Change Programme. As
well as setting out the savings generated to date, it notes
that the more progress made through delivery of the
Sustainable Change Programme, the less impact there
could be on delivery of the council’s core services. 
• There are many mentions of transformation in the council’s
December 2023 Long-term Financial Outlook and Medium-
Term Financial Outlook. Reference is made to the fact that
the scale and pace of transformation needs to increase if
the council is to respond effectively to the challenges it
faces.
• The council classifies transformation as a high risk in its
risk register reflecting the risk that transformation and
change activities fail to deliver at the level of scale and
pace required. The council describes risks associated with
delivering the current transformation programme and
developing a pipeline of future initiatives. Risk control
measures put in place by the council include oversight
from the Transformation Board and workforce planning.  
• The council’s risk score in relation to transformation
reduced slightly in 2024 to reflect a more mature
programme with a greater level of governance,
accountability and confidence around delivery.
43

Page 44

Transformation planning | 11 
Findings Evidence
The council’s Sustainable
Change Programme
consists of five
workstreams and six
service reviews. Regular,
detailed updates are
compiled for each
workstream and service
review. These outline clear
aims, costs and desired
outcomes for users of
services for the majority of
activities. 
• Each of the council’s five transformation workstreams
contain multiple transformation projects. For example, the
sustainability workstream includes two Solar PV Projects,
fleet decarbonisation and expansion of EV structure whilst
the Digital Programme workstream includes website
development and online improvements in accessing the
council. Thirty-three projects and activities are listed in total
across the five workstreams.
• The council has provided the audit team with the detail of
projects under each workstream including status. As at
March 2025, 19 transformation projects were in progress,
two were on hold and two were complete.
• The six service reviews are: early learning and childcare
(now complete), learning resource, waste services,
financial inclusion, housing services and external
residential placements (through the Brighter Pathways
programme). 
• Regular, detailed, internal updates are submitted to the
Transformation Board for each workstream and service
review. These outline clear aims, costs and desired
outcomes for users of services for the majority of activities.
Detailed updates are provided on savings and projected
savings, where these have been identified.  
44

Page 45

Transformation planning | 12 
Findings Evidence
The council’s projected
savings from
transformation fall
significantly short of the
savings required to achieve
financial balance and are
only part of the council’s
solution to closing its
funding gap. 
• The council’s latest Medium Term Financial Outlook
(MTFO) has identified a structural funding gap of £46.7m in
the three-year period to 2027/28 (including HSCP
pressures) Financial efficiencies from the Sustainable
Change Programme amount to £3.136m from 2021/22 to
2023/24, with further efficiencies of up to £8.5m planned
from 2025/26 to 2027/28. 
• The council reported in its Long-term financial outlook that
transformation alone will not offer the full solution to the
financial gap identified in the plan.  
• The council’s structural funding gaps are currently being
met with a combination of recurring and non-recurring
solutions. Officers recognise that future recurring savings
need to be made through transformation of services,
workforce changes, cuts in services, and council tax and
fees and charges increases.  Elected members will need to
make difficult decisions on how the use of limited
resources is prioritised going forward. Plans will need to be
sufficiently ambitious to respond to the scale of its financial
challenges. 
• The council also stated in its long-term financial outlook
that it needed to deliver change and transformation at
scale and pace over the medium and longer term to
address its financial challenges.
• The council is also exploring areas of wider reform to
address its financial challenges. These include national
initiatives through the Improvement Service and Digital
Office that will provide further opportunities for councils to
take a collective approach to areas of service delivery and
opportunities for sharing services on a regional basis. 
Recommendation
The council should ensure its plans are sufficiently ambitious to respond
to its financial challenges. It should clearly set out the extent to which
savings from transformation will help address the budget shortfalls set
out in its Medium-Term Financial Plan.  
45

Page 46

Programme management | 13 
Programme management 
15.  It is essential that the council has good programme management
arrangements in place to ensure it is making sufficient progress against its
transformation plans. It is important that the council has the structures and
the staffing resource in place to deliver its transformation ambitions. In
addition, the council must ensure that both senior officers and elected
members have appropriate oversight of progress.
Findings and evidence relating to the council’s programme management
arrangements 
Findings Evidence
The Transformation Board
provides effective
oversight of the council’s
transformation programme. 
The council has a well-
established and well-
resourced transformation
team.
• The Chief Executive chairs the council’s bi-monthly
Transformation Board. All Chief Officers are members of
the Board. 
• The Board considers and agrees work to be progressed
under the Sustainable Change programme. It receives
updates on the progress of all projects within the
programme and provides strategic oversight of the
programme. 
• Each of the five workstreams has its own project board in
place which feeds into the Transformation Board. 
• The transformation team is well-resourced with 11
members of staff. Members provides project management
and business analysis support to transformation projects.  
• Internal audit recently carried out work on transformation
and change management. It found there was substantial
assurance regarding the governance and management of
transformation projects within the council. It highlighted
that the programme is reviewed regularly at a senior level
and proportionate governance arrangements for individual
workstreams sit underneath.
46

Page 47

Programme management | 14 
Findings Evidence
Members of the Executive
Leadership Team are well-
sighted on the council’s
transformation projects.
They are also responsible
for approving applications
to an investment fund to
help drive transformation.
Nearly £0.800m has been
drawn down from the Fund
in the last two years
although not all of this has
been spent on
transformation. 
• The Executive Leadership team are all members of the
Transformation Board so are well-sighted on the projects
within the workstreams and the service reviews. 
• The Change and Service Redesign Fund is an investment
fund created by the council more than eight years ago to
provide upfront investment to help drive transformation
activity. It is also used to help address temporary resource
challenges. £0.460m was drawn down from the Fund in
2023/24 and £0.330m in 2024/25. Although the balance at
the end of 2024/25 was £2.1m the total uncommitted
balance was £0.189m.
• Examples of projects that have been supported by funding
from the Change and Service Redesign Fund over the last
few years include Development Analysts to support the
council’s Digital Workstream, resource to support Fleet
Decarbonisation and APSE specialist resource as part of
the Waste Services Review.
Elected Members receive
updates on transformation
projects through the annual
budget process, the
council’s performance
reporting framework and
reports to individual
committees. 
• Officers engage with elected members from September to
work towards agreeing the budget for the next year.
Member engagement sessions are held if deemed
appropriate. A detailed session on the transformation
programme was held with the Administration in December
2024 and as part of the Elected Member Development
Programme in February 2025.
• As discussed in Part 4, since January 2025 the council’s
six-monthly progress report on its Council Plan has
included a section on its transformation programme.
• In addition elected members will consider standalone
reports on certain transformation projects, for example the
early learning and childcare review, that was reported to
Cabinet.
• In January 2025, the council took a report to its Audit and
Scrutiny Committee assessing itself against the Accounts
Commission’s October 2024 Transformation in councils
report. 
47

Page 48

Partnership working and community engagement | 15 
Partnership working and
community engagement 
16.  The Best Value in Scotland report noted that councils must now
rethink how they work together, and with local partners and communities,
to provide financially sustainable services. Few councils provide services
jointly or share support services across different councils to a great extent.
The scale and nature of the challenge, as set out in the Transformation in
councils report, means that it is only by working more collaboratively that
councils and their local partners, communities and the third sector will be
able to provide sustainable local services.
17.  In January 2025, the Accounts Commission advised in its Local
government in Scotland Financial bulletin 2023/24  that how councils plan
to use their reserves, make savings and transform their services needs to
become more transparent. The need to consult local communities and
clearly communicate the implications for local services of the budget
decisions taken has never been more important.
Findings and evidence relating to the council’s partnership working and
community engagement arrangements 
Findings Evidence
There are discussions
ongoing across the senior
leadership of North
Ayrshire, East Ayrshire and
South Ayrshire Councils to
explore further
opportunities for public
sector reform and
collaboration including the
Ayrshire Economic
Strategy. These
developments will be
subject to scrutiny by
elected members as they
progress.
• The council recognises that as financial and demographic
challenges increase there is a greater need to work with
partners to share services and increase collaboration.
• Initial discussions are underway around potential
opportunities for further shared services on a regional
basis. The council is involved in exploring a Pan-Ayrshire
approach with East Ayrshire Council and South Ayrshire
Council, with a view to potentially sharing services. There
are some barriers to this level of joint working including the
siloed approach to funding, governance, and reporting
arrangements. Also, the three Ayrshire councils have
different political make-ups. The council refers to the vital
role of national government in enabling more
transformational partnership working between different
bodies. 
48

Page 49

Partnership working and community engagement | 16 
Findings Evidence
The council’s
transformation programme
is primarily internally
focused. However, the
council has shared
examples of where it is
working well with its
partners and listening to its
communities in relation to
transformation. The recent
extensive budget
engagement process
involved consulting with
residents on many
activities overseen by the
Transformation Board.   
• The council notes that although much of its current
transformation programme is internally focused, eg fleet
decarbonisation and maximising rental income across its
estate, it will work with partners and its communities when
opportunities arise. 
• It provided the audit team with examples of transformation
projects involving collaboration with local partners,
communities and the third sector. For example, in 2023, an
engagement programme was undertaken as part of its cost
of living and child poverty initiatives. Its No Wrong Door
mini public enquiry workshops were undertaken with third
sector partners and voluntary organisations. The focus of
these sessions was to identify where the council could
improve, what it was doing well and any gaps. The output
from these sessions helped to influence the development
and delivery of the projects within the council’s Accessing
our Council transformation workstream.
• The Accessing our Council transformation workstream also
used the results of a public engagement survey conducted
in 2022 to gain an understanding of customers’
perceptions on how they were accessing council services
alongside a Peoples Panel survey asking customers about
how they access council services. The results of both
surveys were used to develop the projects within the
Accessing our Council programme such as the introduction
of the council’s new Contact Us process.
• A wider programme of community engagement took place
in winter 2024 on the council’s budget (Exhibit 3). This
included several areas where progress is managed by the
Transformation Board such as: Review of Economic
Development, Growth and Regeneration Services, Review
of waste charges, Realigning the level of teaching resource
and pupil support assistants across schools, charging a
tourist visitor levy and sharing services on a regional basis.
Consulting on specific budget options rather than generic
areas of priority gained a higher level of engagement from
communities.
There is evidence of the
council drawing on the
good practice of other
organisations when
developing transformation
projects.
• There is evidence of the council drawing on other councils’
good practice in transformation projects. For its Solar PV
Farms Project (Exhibit 2), it made positive links with
councils in England embarking on similar projects and
reflected their learning in its plans. Also, a regular item on
the agenda of the Transformation Board is horizon
scanning, supported by evidence of what transformation
projects are being undertaken by other councils.
49

Page 50

Partnership working and community engagement | 17 
Findings Evidence
There are limited joint
funding arrangements
between the council and its
local partners for
transformation projects. 
• The council is aware of many opportunities in the Pan-
Ayrshire collaboration work that could lead to joint funding. 
• At present there are limited joint funding arrangements
between the council and local partners in relation to its
current transformation projects.  
• The council provided examples of joint funding
arrangements for initiatives funded partly by the Scottish
Government. Two members of its staff were funded by the
Scottish Government’s Child Poverty Accelerator Fund to
work on the Single Shared Assessment Project, part of the
Developing our Data Assets transformation workstream.
Also, the council received a Fairer Futures Partnership
Grant to create a Child Poverty Strategy Team.
• North Ayrshire Council is part of a 5G Innovation Region
project, alongside East Ayrshire and South Ayrshire, that
received funding of £3.8m from the UK Government. This
project aligns to the council’s Digital transformation
workstream.
Exhibit 2 
Solar PV Farms Project – learning from councils in England
North Ayrshire Council formed effective relationships with
experienced councils in England to assist in the design and
development of its Solar PV Farms Project 
• In 2021, the council approved the installation of two solar PV farms at
former landfill sites at Nethermains and Shewalton. This project
contributes to the council’s work on climate change and the farms are key
elements of its Sustainable North Ayrshire Strategy. The solar PV farms,
due to become operational later this year, will provide clean, renewable
energy to supply the local electricity grid and aim to contribute to a
reduction in fuel poverty through the availability of affordable energy. 
• As North Ayrshire was the first council in Scotland to install large-scale
solar PV farms, it decided to meet with various councils in England and
Wales to learn from their experiences. Due to the positive relationships
established, the council still meets regularly with some of the other
councils to discuss the future of their solar PV projects. For example,
representatives from North Ayrshire Council visited a site operated by
Warrington Council in York. In return, Warrington Council visited the
council and did a presentation for key partners and stakeholders on the
benefits of its solar PV farms. The council also worked with Strathclyde
University which provided help and support with the projects.
Source: North Ayrshire Council
50

Page 51

Partnership working and community engagement | 18 
Exhibit 3
Engaging with communities on transformation projects as part of the annual budget
engagement process
The council conducted an extended, comprehensive budget
engagement process during Winter 2024 that included asking for
views on several transformation projects
Due to the scale of the financial challenges facing the council, it decided to
carry out a wider than usual programme of community engagement from
October to November 2024 as part of the budget process. Surveys
included a range of options across six main themes, including several
transformation projects such as the learning review, sharing services on a
regional basis and economic development. As the surveys were themed,
people were able to select the areas they were most interested in, rather
than having to complete all themes. 
The refreshed approach resulted in an increased response, from 200 in
2024/25 to 4,461 in 2025-26, in addition to community discussions that
were held. The outcome of the budget engagement process was
communicated to elected members and helped them shape the approach
to future service delivery.
From the transformation proposals included in the budget consultation,
two were agreed as budget savings: the learning review and economic
development service review. 
Source: North Ayrshire Council 
51

Page 52

Impact of transformation | 19 
Impact of transformation 
18.  It is important that the council has success measures in place to
demonstrate the impact of its transformational activity on service quality;
outcomes for people who use services, inequalities and/or savings. 
Findings and evidence relating to the impact of the council’s transformation
activity 
Findings Evidence
The council provides
regular and detailed
information on the financial
and non-financial benefits
of individual transformation
workstreams and service
reviews to the
Transformation Board. The
benefits of individual
projects are also reported
in individual council
reports.   
• The council provides regular and detailed monitoring on the
progress of individual transformation workstreams and
service reviews to the Transformation Board. These updates
include detail on savings and projected savings as well as
intended outcomes. 
• As individual projects complete, the council reports examples
of benefits being realised from individual projects, eg the
Accessing our council transformation workstream (Exhibit 4)
reports on a reduction in public facing email addresses and
phone numbers, a streamlined customer journey that is cost
effective.
• The council has set out the expected benefits of the solar PV
farms project described in Exhibit 2. These include an
approximate £0.4m savings each year from 2026/27 and a
reduction in carbon emissions that will help the council meet
its net-zero targets.   
52

Page 53

Impact of transformation | 20 
Findings Evidence
The council reported
publicly on its progress
with selected
transformation projects in
its Council Plan update in
January 2025. It does not
currently report publicly on
how it is progressing with
delivering transformation
as a whole in terms of
planned and realised
financial and non-financial
benefits. 
• The council provides an overview of its Sustainable Change
Programme in its budget documents. 
• The council produces six-monthly progress reports on its
Council Plan. In January 2025, the progress report included a
dedicated section on transformation providing a summary of
progress on transformation workstreams where key
milestones had been reached during the last six months.
Realised and expected outcomes are referred to. For
example, it notes that the Digital Workstream is expected to
deliver £0.2m of savings by the end of 2027 and realised
benefits from the Accessing our council work is listed. 
• This public-facing report, whilst providing a flavour of its
transformation work, did not provide an overview of the
progress the council is making in delivering transformation as
a whole in terms of planned and realised benefits.   
The council has provided
evidence of using Equality
and Children’s Rights
Impact Assessments in
relation to its
transformation projects,
where appropriate, and has
provided examples of
engagement with user
groups leading to changes
being made in how
services are delivered. 
• We reported in 2023 that the council uses its equality impact
assessment process effectively to ensure children’s rights,
human rights, socio-economic inequalities and the challenges
islands face are considered in new policies, procedures,
strategies and the budget-setting process
• The council uses an Equality and Children’s Rights Impact
Assessment (ECRIA) process. Children’s Rights, Human
Rights, the Fairer Scotland Duty and Island proofing have all
been integrated into this online tool. New or revised policies,
procedures and strategies are assessed to ensure the
council is meeting the needs of the equality duty.
• We asked the council for examples of when it has used the
ECRIA process in relation to transformation projects. The
examples provided were in relation to Contact Us, the
Housing single point of contact project (no full ECRIA was
required) and website redesign. These involved testing of a
new form and process with the Employee Disability Group
and consultation with The Disability Forum, Over 65s’ groups,
Trade Unions, Ayrshire Youth Voice, Drop-in visits to
libraries, NHS Learning and Disability team, Island groups.
• As a result of user testing of the Contact Us form in May
2023, an issue was identified with software used by visually
impaired users which was investigated and re-tested and
successfully resolved the issues raised.
• On the council’s website, ECRIAs carried out for the 2025/26
budget proposals are available. 
• The council is currently working to make all ECRIAs meet
accessibility requirements and so, at present, all other
ECRIAs can only be accessed by emailing the council
directly. 
53

Page 54

Impact of transformation | 21 
Exhibit 4 
North Ayrshire Council’s Accessing our Council project
The council has used an array of success measures to capture the
impact of its project on improving access to council services 
• North Ayrshire Council’s Accessing our Council project was approved in
March 2022. It focuses on improving customer access to council services
through transforming services as well as achieving savings. 
• The project aimed to streamline how customers access council services
digitally and ensure that customers have the information they need at the
first point of contact. The project team developed a new contact us form
for customers to use which presents a drop-down list of the main council
services, which is then linked to relevant pages on the website to provide
more information related to the request. The council captured the impact
of its new approach using a benefits tracker, which included establishing
baseline figures for a number of indicators. 
• The new form went live in June 2023 and the following impact has been
reported: 
• the introduction of the new Contact Us process has led to the number of contacts 
coming into services from the website to reduce by 78 per cent since June 2023. 
This has resulted in a reduction of one FTE no longer being required to manage and 
direct service requests. 
• online interactions have increased from 24 per cent in 2021 to 38 per cent in 2023. 
• the introduction of a web assistant / chat bot in late 2023 has led to over 200 requests 
every week being answered by the chat bot.
• Reduction in phone numbers on the council website of 39 per cent (from 322 to 199)
• Reduction in email addresses on council website of 34 per cent (293 to 200) 
• Shift to online transactions with the council and less reliance on phone calls or visiting
customer centres, increased from 63 per cent to 65 per cent.
Source: North Ayrshire Council 
Recommendation
To provide assurance to elected members and the public about how the
council plans to change to sustain services in the future the council
should report publicly on how it is progressing with delivering
transformation as a whole in terms of planned and realised financial and
non-financial benefits. 
54

Page 55

Appendix | 22 
Appendix
Improvement action plan
Issue/risk Recommendation
Agreed management
action/timing
1. Transformation savings fall
significantly short of the
savings required
The council’s latest MTFO
identifies a structural funding gap
of £46.7m (including HSCP
pressures) which must be
addressed as part of the council’s
Medium-Term Financial Plan.
Whilst we recognise that
transformation alone will not offer
the full solution to the financial
gap identified in the MTFO, the
level of financial efficiencies from
the Sustainable Change
Programme should be
commensurate with the scale of
the financial challenges.
The council should ensure its
plans are sufficiently
ambitious to respond to its
financial challenges. It should
clearly set out the extent to
which savings from
transformation will help
address the budget shortfalls
set out in its Medium-Term
Financial Plan.
Accepted
Management response
It is recognised that the
level of financial
efficiencies should be
commensurate with the
scale of the financial
challenges. Further work
will be progressed as
part of the council’s
medium-term financial
planning to set out clearly
how the council plans to
address budget gaps
through further
transformation and
reform activity and
through a broader
package of measures,
including areas of service
review and possible
reduction, opportunities
for further revenue
generation and an
ongoing planned use of
council reserves. 
Responsible officer
Head of Service
(Financial Services)
Actioned by
31 March 2029
55

Page 56

Appendix | 23 
Issue/risk Recommendation
Agreed management
action/timing
2. Public reporting on progress
with transformation
The council does not currently
report publicly on how it is
progressing with delivering
transformation as a whole in
terms of planned and realised
financial and non-financial
benefits. 
To provide assurance to
elected members and the
public about how the council
plans to change to sustain
services in the future the
council should report publicly
on how it is progressing with
delivering transformation, as
a whole, in terms of planned
and realised financial and
non-financial benefits.
Accepted
Management response
The development of
more public facing
material will be produced
to demonstrate the
council’s progress on the
Sustainable Change
Programme. This will
include use of the
council’s new website to
further promote activity
and the progress being
made to address the
financial challenges. 
Responsible officer
Head of Service
(Financial Services)
Actioned by
30 September 2025 
56

Page 57

North Ayrshire Council 
Best Value thematic management report 
Transformation: how councils are redesigning and
delivering more efficient services to achieve planned
outcomes 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
57

Page 58

58

Page 59

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee 
Title:    2023/24 External Audit Action Plan Update 
Purpose:  To invite Committee to note the updated actions identified in the
2023/24 External Audit Action Plan. 
Recommendation:  That Committee notes the updates to the agreed Action Plans as
outlined in Appendix 1. 
1. Executive Summary 
1.1 Audit Scotland’s Annual Audit Report for 2023/24 was presented to Audit & Scrutiny
Committee on 14 November 2024. 
1.2  Audit Scotland’s reports included action plans in relation to the recommendations for
improvement identified during the course of the audit and full details of the proposed
management actions were appended to the reports. 
1.3 Appendix 1 provides an update on the management actions taken to date and
provides updated target dates for any outstanding items. 
2. Background 
2.1 The 2023/24 audit of the Council’s accounts was conducted by Audit Scotland and
their report on the Annual Audit was presented to Audit & Scrutiny Committee on 14
November 2024. 
2.2  The recommended actions identified in the reports related to a range of issues,
including: 
• Asset registers;
• Sickness absence;
• Workforce planning;
• Digital technology improvements;
• Digital skills;
• Agile working; and
• Joint workforce arrangements. 
Agenda Item 6
59

Page 60

2.3  A review of the proposed management actions has now been undertaken and details
of the completed actions and their completion dates have been detailed in Appendix
1. Where any actions have not yet been completed, the appendix provides an update
on the proposed management action and the target date for completion. 
2.4  In summary, the updates note: 
• 2023/24 Annual Audit Report - All actions completed; and 
• Best Value Thematic Report – The majority of actions have been completed with
the exception of 2 actions with later target dates:
 The agreed action in relation to joint workforce arrangements is ongoing with an
agreed target date of 31 March 2026; and 
 Progress on measuring the impact of workforce planning is on track for
completion by the target date of 30 September 2025. 
3. Proposals 
3.1 It is proposed that Committee notes the updates to the agreed Action Plans as outlined
in Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
60

Page 61

Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Responsible Officers identified within the Audit and Best Value reports have been
consulted as part of the review. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
External Audit Report on the 2023/24 Audit and Best Value Work – Audit & Scrutiny
Committee, 14 November 2024   
61

Page 62

Appendix 1
2023/24 Annual Audit Report
Issue / Risk Recommendation Agreed management action Actions Completed Completion Date
1. Asset register – fully
depreciated assets 
The asset register includes around
840 assets which are fully
depreciated with an original cost and
accumulated depreciation of £57.226
million. Where assets are no longer
in use they should be formally
scrapped or sold. Significant assets
continuing in use should be revalued
and depreciated over the remaining
useful economic life. 
Risk: There is a risk that assets are
inaccurately recorded in the council’s
asset register and financial
statements. 
Where significant fully
depreciated assets are still
in use they should be
revalued and depreciated
over their remaining useful
economic life. Other assets
should be considered for
disposal. The council
should obtain evidence at
least annually to confirm
that assets on the asset
register remain in use.
A full review of all fully
depreciated assets will be
carried out during 2024-25 and
items will be removed from the
asset register, where
appropriate. Remaining assets
will be reviewed in conjunction
with services to update
valuations and useful economic
lives as required.
David Forbes, Senior Manager
-  Finance and Revenues
31 March 2025
Fully depreciated assets have
been reviewed and removed
from the asset register as
appropriate.
Year end procedures have
been updated to include this is
an ongoing task in future years. 
31 March 2025
2. General Ledger – Security
Management Plan 
The system supplier’s Security
Management Plan for the general
ledger system has not been updated
since 2021. The council raised this
with the supplier who confirmed that
the security plan has not changed,
however it does need to be updated
to reflect a change in ownership of
the business. The supplier advised
that this work is currently ongoing. 
Risk: There is an increased risk to
business continuity if the security
management plan is not kept up to
date. 
Although the updating of
the security management
plan is in progress there is
a role for the council as
customer to monitor the
supplier's progress in this
area and ensure the
security management plan
is updated in a timely
manner.
The Finance Service will liaise
with the software supplier to
ensure that the security
management plan is updated.
David Forbes, Senior Manager
-  Finance and Revenues
31 March 2025
Updated documentation
received from the software
supplier.
29 October 2024
62

Page 63

Appendix 1
Issue / Risk Recommendation Agreed management action Actions Completed  Completion Date
3. Sickness absence 
High absence rates were reported in
areas which require cover
arrangements, specifically teachers
and waste collection. In 2023/24 this
resulted in additional costs of
£1.980m associated with mandatory
cover for teacher absence. There
was also a £0.653 million overspend
in employee costs for Waste
Services. The statutory nature of the
service requires additional resources
to cover unforeseen absences. 
Risk - a high sickness absence level
will impact on the council’s ability to
achieve financial balance and could
adversely impact on safe and
efficient service delivery. 
The effectiveness of
existing measures to
reduce absence levels
should be assessed to
ensure they are appropriate
and can deliver improved
attendance at work.
Lead Officers for Waste and
Education will progress a
programme of work to monitor
absence and effectively
implement the policy with
support provided from HR as
required.  
Absence will be monitored
corporately and appropriate
interventions will be considered
and implemented to improve
attendance at work.
Russell McCutcheon,
Executive Director – Place;
Sam Anson, Executive
Director – Education;
Fiona Walker, Head of People
& ICT
31 March 2025
Within Education, staff absence
management procedures have
been updated with regular
emails being sent to Heads of
Establishments to improve
recording. Education is working
collaboratively with HR and
data analytics colleagues on a
range of areas. 
Within Waste there are a
variety of actions being
progressed to support the
management of absence.
In addition to the action being
taken within these Directorates,
a variety of interventions are in
place and will continue to be
progressed council wide to
support managers in the
application and management of
the absence policy, support
employees’ wellbeing and
improve attendance.  
Full details of the actions being
taken across Directorates is
detailed below. 
31 March 2025 
63

Page 64

Appendix 1
3. Sickness absence additional – Full details of actions being taken across Directorates
Within Education, staff absence management procedures have been updated with regular emails being sent to Heads of Establishments to improve recording.
Education is working collaboratively with HR and data analytics colleagues on a range of areas including:
• Improving the information we provide directly to Heads and Improving service specific guidance and training to support Heads and school staff recording
absence.   
• Missing or out of date fit notes are being requested directly from Head Teachers from the central team and the email details any other outstanding issues or
potential supports such as discretion / OH referrals. 
• Information from HR is due to be sent to Heads of Establishment w/b 22 April regarding ‘How To’ sessions on absence and this will be supported by the
central team.
Within Waste there are a variety of actions being progressed to support the management of absence and are summarised below: 
• Temporary dedicated resource recruited to assist line managers with the implementation of the Wellbeing at Work Policy.
• Weekly e mail sent to Head of Service and management team detailing the number of absences and supports in place for each individual.
• Fortnightly meeting held between Head of Service, Waste Management Team and HR Advisor to discuss progress, supports, interventions required.
• Employees being supported back to work with referrals to Occupational Health.
• Alternative duties for employees unable to carry out normal duties.
• Health checks being delivered for all employees from a preventative health perspective.
• Absence trend is improving – Jan 2024 was 2.8 days Feb 2024 was 3.62 days and March 2024 days was 4.09 days per employee. This compares to Jan
2025 2.29 days Feb 2025 2.8 days and March 2025 2.07 days per employee.
In addition to the action being taken within these Directorates, a variety of interventions are in place and will continue to be progressed council wide to support
managers in the application and management of the absence policy, support employees’ wellbeing and improve attendance.  These interventions, albeit not
exhaustive, include:
• Targeted awareness sessions and support have taken place with staff involved in absence management within Place and Education ensuring a tailored
package of advice and guidance specifically for those areas that require cover arrangements.  Targeted support for managers within HSCP is also being
provided to ensure a confident approach to managing absence.  
• Automated absence reports issued to Managers across the Council on a regular basis to ensure assessment of absence levels are monitored, recording of
absence is accurate and  appropriate wellbeing supports are put in place for individuals. 
• Absence information reported on a regular basis to ELT in conjunction with Directors to ensure oversight of absence levels and action being taken to improve
attendance.
• Dedicated temporary HR resource to support council wide absence management.
• Regular analysis by HR of absence reports to provide support to managers and ensure they have the right advice and guidance on managing individual
absences, accessing wellbeing interventions and utilising other policies where appropriate. 
• Analysis of absence information conducted to inform new categories of absence which should provide more accurate and robust monitoring and reporting. 
• Information sessions delivered for managers to ensure a full understanding of absence in relation to the policy, monitoring and wellbeing.   
• Absence performance measures have been communicated through relevant channels to ensure managers are informed and focused on the importance of
absence management. 
• Case management support being provided by HR to managers on complex cases to ensure appropriate steps are being taken to support employees. 
• Information sessions delivered in conjunction with our Occupational Health provider, providing managers with guidance on making an effective OH referral.
• Variety of Wellbeing initiatives are available through our Livewell programme and Occupational Health provider to support employees, such as our Employee
Assistance Programme and sessions for menopause, grief and loss, weight management, Health Check etc, as well as sporting activities such as golf, hiking
and indoor climbing.
64

Page 65

Appendix 1
BV Thematic Report
Issue / Risk Recommendation Agreed management  Actions Completed  Completion Date
1. Corporate workforce planning
priorities and action plan
The Workforce Strategy 2023-28 sets
out the council’s approach to
workforce planning but does not
articulate what its strategic workforce
priorities are or include a corporate-
level action plan. 
Risk: There is a risk that the
council’s approach to workforce
planning is not strategic and progress
cannot be measured. 
The council should
establish corporate
workforce planning
priorities and develop a
SMART action plan to
allow progress in
delivering these priorities
to be measured.
The Workforce Strategy
will be updated to include
corporate workforce
planning priorities and an
action plan to allow
progress to be measured.
Fiona Walker, Head of
People and ICT
31 March 2025 
The Workforce Strategy has been fully
updated to align with internal/external
factors, workforce challenges, Council
Plan priorities and other key
strategies/plans.  An Action Plan and
Corporate Performance Indicators have
also been included to allow progress to
be measured.   This refreshed Strategy
was agreed at the Executive Leadership
Team on 29 January 2025 and at Cabinet
on 18 March 2025.  
18 March 2025
2 Alignment of workforce strategy
to key strategies and plans and
inclusion of data
The Workforce Strategy 2023-28 is
not aligned to the council’s other key
strategies and plans and does not
include an analysis of council-level
workforce data.
Risk: There is a risk that the council
is not clear about the way in which
workforce planning can help deliver
its strategic priorities and it may not
be using the council-level workforce
data it has to full effect. 
The council’s workforce
strategy should be
updated to align with all
four Council Plan 2023-28
priorities and with other
key strategies and plans.
It should include an
analysis of council-wide
workforce data and set
out what the required
skills, learning and
development needs of its
staff are
The Workforce Strategy
will be updated to ensure
alignment to all Council
Plan priorities, other key
strategies/plans and
include an extract of
council-wide workforce
data.
Fiona Walker, Head of
People and ICT
31 March 2025
The Workforce Strategy has been fully
updated to align with internal/external
factors, workforce challenges, Council
Plan priorities and other key
strategies/plans.  The Strategy has also
been updated to include an extract of
council wide workforce data.  This
refreshed Strategy was agreed at the
Executive Leadership Team on 29
January 2025 and at Cabinet on 18
March 2025.  
18 March 2025
65

Page 66

Appendix 1
Issue / Risk Recommendation Agreed management
action
Actions Completed Completion Date
3 Measuring the impact of digital
technology improvements
The council has established the
workforce benefits and productivity
gains of its digital technology
improvements but there is scope for
more of these to be quantified. 
Risk: There is a risk that the council
does not fully understand the
workforce benefits from digital
technology improvements to inform
future decision-making
The council should build
on the work it has done to
date to demonstrate and
quantify what workforce
benefits and productivity
gains have been made
through its use of digital
technology.
Further work will be
undertaken to capture and
quantify efficiencies from
digital improvements and
for this work to be
incorporated within the
Council’s Medium-Term
Financial Planning.
Mark Boyd, Head of
Finance
31 March 2025
On the back of the Accessing Our
Council workstream the Transformation
Board recently approved the creation of
a new Digital Programme workstream.
The intention is that this will allow digital
activities to be monitored against the
Council’s Digital Strategy. 
To provide some initial evidence of
progress, the Council’s Budget on the
26 February 2025 included savings
associated with the Channel shift to
digital solutions of £100,000 per year for
25/26 and 26/27. 2 posts were identified
in 25/26 (through non-filling of vacant
posts) and further posts will be identified
for 26/27 as part of the Council’s
Purchase to Pay project which aims to
centralise the accounts payable process
and further advance e-invoicing. 
Reporting progress through the new
digital workstream provides the
framework to capture and monitor the
workforce benefits. 
26 February 2025
66

Page 67

Appendix 1
Issue / Risk Recommendation Agreed management
action
Actions Completed Completion Date
4 Improving digital skills
The council is considering how to
further enhance the digital skills and
knowledge of its workforce. 
Risk: There is a risk that the council
does not focus its digital skills
training in the right areas because it
does not know what its employees’
digital learning needs are.
The council should
consider conducting
another digital skills
survey to inform the
support it provides for
improving the digital skills
and knowledge of its
workforce.
A digital skills survey will
be conducted to inform
future development
interventions. 
Fiona Walker, Head of
People and ICT
31 March 2025
The Digital Skills survey was conducted
during November/December 2024 and
was open to all North Ayrshire Councils
employees. 
The survey focused on key themes
designed to assess digital confidence and
competence across a range of everyday
and work-related tasks.  
Completion of this survey has captured a
comprehensive picture of digital skills that
are relevant both in the workplace and in
personal life and to inform future
development intervention.  
An Action Plan has been created to
monitor the progress of interventions.   
28 February 2025
5 Gathering feedback on the
Impact of agile working
The council has gathered feedback
on wellbeing and productivity in
relation to agile working through
various channels during the past few
years. A council-wide employee
engagement survey has not been
conducted since 2019/20 due to
resource limitations driven by
financial constraints.
Risk: There is a risk the council is
not aware of the impact of agile
working on wellbeing and
productivity. 
The council should
consider gathering further
feedback from staff on the
impact of agile working on
wellbeing and
productivity.
Further feedback will be
gathered from those
employees who are
deemed an agile
workstyle to gauge
continued benefits on
wellbeing and
productivity.
Fiona Walker, Head of
People and ICT
31 March 2025
The Agile working wellbeing survey was
conducted during December 2024 and
was open to all North Ayrshire Councils
employees deemed as an agile
workstyle. 
The survey focused on key themes
designed to assess how people viewed
agile working, their productivity, work-life
balance and wellbeing. 
An Action Plan has been developed in
line with key themes arising from the
results. Chief Officers have also received
specific results in relation to their
directorate/service to allow any local
action to be considered/progressed.  
28 February 2025
67

Page 68

Appendix 1
Issue / Risk Recommendation Agreed management
action
Actions Completed Completion Date
6. Joint workforce arrangements
There is scope for the council to
explore further where it can work
together with partners to share
services and increase collaboration. 
Risk: There is a risk the council may
not be utilising opportunities for
shared services and collaboration
opportunities across partner
organisations. 
The council should
explore further where it
can work together with
partners to share services
and increase
collaboration.
The Medium-Term
Financial Planning
process for 2025/26 to
2027/28 will include the
exploration of further
opportunities for sharing
services and collaboration
across partner
organisations.
Mark Boyd, Head of
Finance
31 March 2026
Collaborative opportunities continue to be
explored with South and East Ayrshire
Councils on options around sharing
services on a regional basis. The work to
date has been led by the 3 Ayrshire Chief
Executives. 
A recent £500,000 bid was submitted to
the Scottish Government Public Sector
Reform Fund to further develop
opportunities on a spend to save basis. 
It is anticipated that, should the bid be
successful, this work will form part of the
SOLACE transformation programme. 
Ongoing
7 Measuring the impact of
workforce planning
The council could improve how it
monitors the effectiveness of its
workforce planning practice by
regularly reporting progress against
workforce planning priorities.
Risk: There is a risk that the
council’s workforce planning
arrangements are not supporting the
delivery of the strategic priorities in
its Council Plan. 
In addition to providing
general workforce
planning updates, the
council should regularly
report its progress against
its workforce planning
priorities to elected
members through its
Council Plan updates or
other means
Workforce planning
updates and progress
against priorities will be
regularly reported through
Council Plan updates and
other means
Fiona Walker, Head of
People and ICT
31 March 2025
The Action Plan aligned to the Workforce
Strategy has been agreed and set up on
Pentana.  Lead officers will provide
regular updates which will be included in
the regularly reporting of the Council
Plan.  In addition, an update will be
provided on a regular basis to the 1st tier
JCC.    
31 March 2025
68

Page 69

Appendix 1
Issue / Risk Recommendation Agreed management
action
Actions Completed Completion Date
8 . Measuring the impact of
workforce planning
There is scope for the council to draw
upon the information it already
collects to develop a performance
dashboard to monitor and inform
future workforce planning practice.
Risk: There is a risk that the
workforce planning information the
council already collects is not being
used to full effect. 
The council should
develop a performance
dashboard to provide a
user-friendly overview of
the impact of its workforce
planning. This could help
to inform future workforce
planning.
A performance dashboard
will be developed to
monitor and inform future
workforce planning.
Fiona Walker, Head of
People and ICT
30 September 2025
A performance dashboard has been
scoped in line with the Performance
Indicators agreed as part of the
Workforce Strategy.  This dashboard is
currently in design stage and on track for
completion by the end of September
2025.
In Progress – on
track 
69

Page 70

70

Page 71

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee
Title: Annual Governance Statement 2024/25
Purpose: To seek approval of the Council’s Annual Governance
Statement for 2024/25 which will be included within the draft
Annual Accounts.
Recommendation: That the Committee approves the draft Annual Governance
Statement which is attached at Appendix 1. 
1. Executive Summary 
1.1 The Council’s Annual Governance Statement outlines the governance framework
which is in place and changes which have been made to strengthen the framework
during 2024/25. 
1.2 Approval of the Annual Governance Statement will ensure that the Council complies
with the requirements of the Local Authority Accounts (Scotland) Regulations 2014. 
2. Background 
2.1 North Ayrshire Council is responsible for ensuring that its business is conducted in
accordance with the law and proper standards, and that public money is safeguarded
and properly accounted for and used economically, efficiently, and effectively to
achieve Best Value. 
2.2 The Council is also responsible for putting in place proper arrangements for the
governance of its affairs and facilitating the effective exercise of its functions, which
includes arrangements for the management of risk. 
2.3 The Council has approved and adopted a Code of Corporate Governance, which is
consistent with the principles of the CIPFA/SOLACE framework ‘Delivering Good
Governance in Local Government’. 
2.4 The Local Authority Accounts (Scotland) Regulations 2014 require that local
authorities prepare an Annual Governance Statement, in accordance with proper
practices in relation to internal control, and that the Statement should be approved by
the Audit Committee or equivalent.
Agenda Item 7
71

Page 72

2.5 Following approval of the Annual Governance Statement, it requires to be signed by
the Leader of the Council and the Chief Executive prior to its inclusion within the
Council’s draft annual accounts.
2.6 The Annual Governance Statement, which is attached in full at Appendix 1 to this
report, explains how the Council complies with the Code of Corporate Governance. It
identifies the main components of the Corporate Governance Framework which are in
place, including the system of internal control, and details the changes which have
taken place to the framework during 2024/25. 
2.7 The Annual Governance Statement also identifies improvement actions which are
planned to the governance framework during 2025/26. It concludes with an assurance
statement by the Leader of the Council and the Chief Executive. 
3. Proposals 
3.1 It is proposed that the Committee approves the draft Annual Governance Statement
which is attached at Appendix 1. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 Approval of the Annual Governance Statement will ensure that the Council complies
with the requirements of the Local Authority Accounts (Scotland) Regulations 2014. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 Good governance arrangements help to underpin the delivery of the Council’s key
priorities.
72

Page 73

Community Wealth Building
4.7 None.
5. Consultation
5.1 No consultation has been required during the preparation of the Annual Governance
Statement. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.
73

Page 74

Appendix 1  PUBLIC INFORMATION
PUBLIC INFORMATION
Annual Governance Statement – 2024/25 
Scope of Responsibility
North Ayrshire Council is responsible for ensuring that its business is conducted in accordance with
the law and proper standards, and that public money is safeguarded and properly accounted for and
used economically, efficiently and effectively to achieve Best Value.  
The Council is also responsible for putting in place proper arrangements for the governance of its
affairs and facilitating the effective exercise of its functions, which includes arrangements for the
management of risk.
The Council has approved and adopted a Local Code of Corporate Governance, which is consistent
with the principles of the CIPFA/SOLACE Framework ‘Delivering Good Governance in Local
Government’ (2016).  A copy of the local code is available here.
This statement explains how North Ayrshire Council complies with the Code of Corporate Governance
and meets the requirements of the ‘Code of Practice for Local Authority Accounting in the UK: A
Statement of Recommended Practice’, in relation to the Statement on the System of Internal Financial
Control. 
The Purpose of the Governance Framework
The governance framework comprises the systems and processes, and culture and values by which
the authority is directed and controlled.  It enables the authority to monitor the achievement of its
strategic objectives and to consider whether those objectives have led to the delivery of appropriate,
cost-effective services and the achievement of key outcomes.
The system of internal control is a significant part of that framework and is designed to manage risk to
a reasonable level.  The system of internal control is based on an ongoing process designed to
identify and prioritise the risks to the achievement of the Council’s objectives, to evaluate the
likelihood of those risks being realised and the impact should they be realised, and to manage them
effectively. 
The Governance Framework
The Council’s Framework is built around the seven core principles and 21 sub-principles that set out
the key building blocks of good governance. 
74

Page 75

Appendix 1  PUBLIC INFORMATION
PUBLIC INFORMATION 
The key features of the governance framework that were in place during 2024/25 are included below:
• The Cabinet was the key decision-making Committee, comprising the Leader of the Council, the
Depute Leader and four members of the Administration, each with a specific portfolio of duties. An
Education Cabinet comprised the same members and included church and teaching profession
representatives.
• The Audit and Scrutiny Committee, which is chaired by the Leader of an Opposition party, was in
place to consider all matters in relation to Internal and External Audit, Risk Management, Scrutiny
and Performance, as well as receiving reports on the findings of external scrutiny bodies. A cross-
party Policy Advisory Panel assists in the development of policy proposals for consideration and
approval by Cabinet.
• A publicised Whistleblowing Policy is in place (last updated in July 2024) and is publicised
throughout the Council and community.  Effective counter fraud and anti-corruption arrangements
are in place and are consistent with the main principles set out in the CIPFA Code of Practice on
Managing the Risk of Fraud and Corruption.
• Strategic decision-making is governed by the Council’s key constitutional documents including
standing orders, scheme of administration, scheme of delegation to officers and financial
regulations and associated codes of financial practice. These were refreshed and approved by
the Council in September 2024.
• The Council has six Locality Partnerships, covering Irvine, Kilwinning, the Three Towns, Arran,
the North Coast and the Garnock Valley. Chaired by a local Elected Member, the Partnerships
provide the opportunity for Elected Members, Community Planning Partners and local community
representatives to consider the priorities for each area.
• The Health and Social Care Partnership (HSCP) has an established governance framework
through the Integration Joint Board and an integrated senior management structure to support
delivery of its key objectives. 
• The Council’s mission, vision and key priorities are outlined in the Council Plan 2023-2028 which
is underpinned by a delivery plan and a range of performance indicators. Regular interim reports
are provided to both Cabinet and the Audit and Scrutiny Committee on progress towards meeting
the Council Plan priorities.
• Progress with the Council’s Transformation programme continues to be governed and monitored
through the Transformation Board which is chaired by the Chief Executive.
• The Performance Management Strategy 2023-28 demonstrates how the Council supports a
culture of continuous improvement and how the work of every employee is crucial to the
achievement of the overall vision of a North Ayrshire that is Fair For All. Regular reporting to
Elected Members takes place, and a wide range of performance information is available on the
North Ayrshire Performance Dashboard.
• The Council has adopted a ‘Code of Conduct’ for all its employees. Elected Members adhere to
the national ‘Code of Conduct for Councillors’ and a register of interests is in place.
• The approach to risk management is set out in the Risk Management Policy and Strategy: “Risk
Focus”. The Council’s strategic risk register is refreshed annually and for 2024/25 was approved
by Cabinet in March 2024. Monitoring of progress against action points is reported to the Audit
and Scrutiny Committee at the mid-year point.
• Each Head of Service has a Workforce Plan in place for their portfolio of services which considers
challenges and issues, the transformation agenda and to support career development and
succession planning. These plans are aligned to the Council’s Corporate Workforce Planning
strategy.
• The Council has in place a development programme for all Elected Members.  Leadership and
Development programmes are also established for leaders and first line and middle managers
across the Council, through the Leadership Academy approach.
• The ‘Our Time to Talk’ approach is in place to ensure that managers and employees take time to
discuss how each employee is getting on at work; this focusses on the employee’s contribution to
their team and the Council, their wellbeing, and any development needs that contribute towards
meeting the team’s objectives or the employee’s career aspirations.
75

Page 76

Appendix 1  PUBLIC INFORMATION
PUBLIC INFORMATION
• The Council’s approach to asset management planning is based on CIPFA guidance which
covers six core classes of assets: property, open space, housing, roads, fleet, and ICT. Asset
management plans continue to be maintained across each of these areas.
• A Capital Programme and Assets Group (CPAG), consisting of senior officers from across
Council services and chaired by the Head of Finance, is in place. This group monitors the delivery
of the Council’s capital programme, helping to ensure that projects are delivered on time and
within budget. The work of this group is supported by Service Project Boards.
• The Council has a long-term financial outlook, which covers the period 2024/25 to 2033/34. This
sets out the scale of the potential financial challenge and the approach to pro-actively address it,
ensuring financial sustainability of the Council over the long-term.
• The Council has Internal Audit and Corporate Fraud teams to carry out independent and objective
reviews of governance and internal control arrangements and investigate allegations of fraud and
error both within and against the authority.
• An Information Governance framework is in place which complies with the General Data
Protection Regulation (GDPR), supported by a central team of staff within Democratic Services.
This is further supported through an Information Governance Procurement Framework. A
corporate training module is in place to support ongoing training, development and awareness
which is completed on an annual basis.
• The Council has a robust Corporate Health, Safety and Wellbeing Policy to help ensure it
complies with health and safety legislation.
• An annual report is prepared for Cabinet by the Council’s statutory Chief Social Work Officer.
• The Council has a two-stage Complaints Procedure, which provides a transparent and
standardised process for customers who wish to complain and enables the Council to manage
complaints more effectively and to identify any service improvements which may be required. 
The governance framework has been in place at North Ayrshire Council throughout the year ended
31st March 2025. 
The System of Internal Financial Control
The system of internal financial control is based on a framework of regular management information,
financial regulations, administrative procedures (including segregation of duties), management
supervision, and a system of delegation and accountability.  Development and maintenance of the
system is undertaken by Chief Officers within the Council.  In particular, the system includes:
• Financial regulations and codes of financial practice.
• Comprehensive budgeting systems.
• Regular reviews of periodic and annual financial reports that indicate financial performance
against the forecasts.
• Setting targets to measure financial and other performance.
• Clearly defined capital expenditure guidelines.
• Formal project management disciplines.
The Council’s financial management arrangements conform to the governance requirements of the
CIPFA statement on ‘The Role of the Chief Financial Officer in Local Government (2016)’.
Regarding the entities incorporated into the Group Accounts, the Council is not aware of any
weaknesses within their internal control systems and has placed reliance on the individual Statements
of Internal Financial Control where appropriate. 
Review of Effectiveness of the Governance Framework
North Ayrshire Council has responsibility for conducting, at least annually, a review of the
effectiveness of its governance framework including the system of internal control. The review of the
effectiveness of the framework is informed by the work of the Executive Leadership Team who have
responsibility for development and maintenance of the governance environment, the annual report by
76

Page 77

Appendix 1  PUBLIC INFORMATION
PUBLIC INFORMATION
the Senior Manager (Audit, Fraud, Safety, Risk & Insurance) and reports from the Council’s external
auditors, Audit Scotland, and other review agencies.
The Head of Finance has overall responsibility for Internal Audit in North Ayrshire Council.  The
Senior Manager (Audit, Fraud, Safety, Risk & Insurance) is responsible for the management of the
section and reports directly to the Head of Finance on all audit matters, with the independent right of
access to the Chief Executive and Chair of the Audit and Scrutiny Committee. The Internal Audit
section is fully resourced to deliver its planned activity and complies with the Public Sector Internal
Audit Standards (PSIAS) in conducting its audit work. Regular reports were made to the Council’s
Audit and Scrutiny Committee throughout 2024/25.
As detailed in the Internal Audit Charter, most recently approved by the Audit and Scrutiny Committee
in March 2025, the Internal Audit function has independent responsibility for examining, evaluating,
and reporting on the adequacy of internal control.  The Senior Manager (Audit, Fraud, Safety, Risk &
Insurance) prepares an annual report, including an assurance statement containing a view on the
adequacy and effectiveness of the governance, risk management and internal control frameworks.
This was reported to the Audit and Scrutiny Committee on 30 May 2024 and will be updated for 29
May 2025 Committee.
The Internal Audit Annual Report 2024/25 highlights a number of findings by the Council’s Internal
Audit section. Action plans are put in place to address control weaknesses on conclusion of each
audit and implementation of audit actions is tracked on a quarterly basis by the Council’s Audit and
Scrutiny Committee. None of these are considered material enough to have a significant impact on
the overall control environment and it is the opinion of the Senior Manager (Audit, Fraud, Safety, Risk
& Insurance) that the Council’s systems of internal control continue to provide reasonable assurance
against loss.
The Council’s internal audit arrangements conform to the governance requirements of the CIPFA
statement on ‘The Role of the Head of Internal Audit (2019)’. 
Significant Governance Developments during 2024/25  
A number of significant governance related development occurred during 2024/25. They include:-
The Audit and Scrutiny Committee requested the inclusion of a new standing item of business to
consider areas of future business for scrutiny. During 2024/25 this included a request for further
scrutiny of the Council’s absence management policy and performance.
The annual review of the Council’s key governance documents was completed, including Standing
Orders relating to Meetings and Proceedings of the Council and Committees, Scheme of
Administration, Scheme of Delegation to Officers, Guidelines on Member / Officer Relations, Standing
Orders for Contracts, Financial Regulations and Codes of Financial Practice 2024.
The Kilwinning and Arran By-Elections were held during 2024. The election results changed the
political composition of the Council, with the Labour Group forming the main opposition. However,
there was no change in the administration.
North Ayrshire Council Unaudited Annual Accounts for 2023/24 were approved at Council in June
2024 and the Audited Accounts approved in November 2024 through the Audit and Scrutiny
Committee.
Following Cabinet approval of an interim governance structure to develop a long-term town plan,
North Ayrshire Council approved elected member representation to the Irvine Town Board. The Board
will oversee development of a planned £20million investment for the area.
The HSCP formed a Finance Working Group to address the current financial pressures and develop
financial recovery plans and savings.
The Best Value thematic review for Workforce Innovation was carried out by Audit Scotland with the
findings presented to the Audit and Scrutiny Committee during 2024/25.
The Medium-Term Financial Outlook covering the period 2025/26 to 2027/28 was presented to
Council in October 2024. This also included the launch of an extensive Budget engagement and
Consultation process across North Ayrshire communities. The feedback from which was presented to
Council in February 2025 in advance of the Budget. The process resulted in several Petitions
submitted from communities which were considered by the Council’s Cabinet and Audit and Scrutiny
Committee.
77

Page 78

Appendix 1  PUBLIC INFORMATION
PUBLIC INFORMATION
The Council’s General Services Revenue Estimates covering the period 2025/26 to 2027/28 (the
Budget) were approved on 26 February 2025  
Approval by the Audit and Scrutiny Committee of the Code of Corporate Governance statement for
2024. This set out details of how North Ayrshire Council complies with the Delivery of Good
Governance in local Government; Framework.
Review of the Council’s main strategic risks delivered through the Council’s Cabinet and Audit and
Scrutiny committees. This included new risks and increased risks related to the Council’s financial
sustainability. 
Planned Actions for 2025/26
The Council has a number of planned actions for 2025/26 which will help to further strengthen the
governance framework:
• Further support to the HSCP in addressing the financial pressures faced and ensuring
appropriate reporting and governance arrangements are in place.
• Continuation of close monitoring of the Council’s Absence management performance and
governed through the Council’s Executive Leadership team.
• Continued support for the governance of the Irvine Town Board and Ayrshire Growth Deal
programme as they progress investment plans.
• For 2025/26 a key focus on delivery of the Council’s Transformation programme and
supporting governance arrangements which will be subject to a Best Value Thematic Review
by Audit Scotland and the Accounts Commission.
• Development of the Council’s Medium-Term Financial Plan for the period 2026/27 to 2028/29
including a review of community and elected member engagement through this process.
• Approval of an AI policy for the Council to support future digital development opportunities,
whilst ensuring appropriate data protection and information governance arrangements are in
place. 
Assurance
Subject to the above, and based on the assurances provided, we consider the governance and
internal control environment operating during 2024/25 to provide reasonable and objective assurance
that any significant risks impacting on the achievement of our actions will be identified and actions
taken to avoid or mitigate their impact. Systems are in place to continually review and improve the
governance and internal control environment and action plans are in place to address identified areas
for improvement. 
Craig Hatton Marie Burns
Chief Executive Leader of the Council
Date TBC Date TBC 
78

Page 79

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee 
Title:    Accounting Policies 2024/25 
Purpose:  To seek the Audit and Scrutiny Committee’s approval of the
accounting policies which will be adopted in the preparation of
the Council’s annual accounts for the year to 31 March 2025. 
Recommendation:  That the Audit and Scrutiny Committee approves the accounting
policies as detailed in Appendix 1. 
1. Executive Summary 
1.1 The annual accounts for the 2024/25 financial year summarise the Council
transactions during the year and its position at the year end of 31 March 2025. Under
the Local Authority Accounts (Scotland) Regulations 2014, the Council is required to
prepare an annual Statement of Accounts and Section 12 of the Local Government in
Scotland Act 2003 requires that these accounts are prepared in accordance with the
proper accounting practices. 
1.2 These practices primarily comprise the Code of Practice on Local Authority
Accounting in the United Kingdom 2024/25 (“the Code”), supported by International
Financial Reporting Standards (IFRS). These are issued jointly by the Chartered
Institute of Public Finance and Accountancy (CIPFA) and the Local Authority
(Scotland) Accounts Advisory Committee (LASAAC) and are designed to give a “true
and fair view” of the financial performance of the Council. 
1.3 The accounting policies to be adopted by North Ayrshire Council are reviewed on an
annual basis in line with the CIPFA Code and submitted to the Audit and Scrutiny
Committee for approval in advance of the financial statements being prepared. 
1.4 The proposed accounting policies for 2024/25 have been updated to reflect changes
in the guidance received from CIPFA during 2024/25. 
1.5 The accounting policies have been updated for the adoption of IFRS16 Leases with
effect from 1 April 2024. There will be no impact on General Fund or HRA Reserves. 
Agenda Item 8
79

Page 80

2. Background 
2.1 Accounting policies are defined in paragraph 3.3.2.1 of the Code as ‘the specific
principles, bases, conventions, rules and practices applied by an authority in preparing
and presenting financial statements’. 
2.2  Councils are required to select accounting policies and apply changes to accounting
policies in accordance with International Accounting Standard 8 - Accounting Policies. 
2.3  The Council is required to adopt the accounting policies most appropriate to its
particular circumstances for the purpose of giving a true and fair view. The accounting
policies adopted should be reviewed regularly to ensure that they remain appropriate
and consider the required treatment of any new policies relevant to the Council’s
particular circumstances. Sufficient information should be disclosed in the financial
statements to enable users to understand the accounting policies adopted and how
they have been implemented. 
2.4  The draft accounting policies proposed for adoption are detailed in Appendix 1 and
include the following revisions identified during 2024/25: 
(i) Leases 
IFRS 16 Leases has been adopted from 1 April 2024. The adoption of the new
standard will result in the balance sheet recognition of a right of use asset and
related lease liability in relation to a number of former operating leases. 
IFRS 16 also applies to Service Concession contracts where the new calculations
mean that future inflationary increases is now included in the valuation of the
liabilities. This will not change the value of the asset as these are valued already as
part of the council’s asset valuation plan.  The value of the liability is calculated
including future inflationary increases and is discounted based on an equivalent
interest rate to the term of the years remaining on the contracts.
This will result in an increased liability in relation to the PPP schools (Greenwood, St
Matthews, Arran High and Stanley Primary) and Largs Campus. The total increase in
liability will be offset by changes in the Revaluation Reserve and the Capital
Adjustment Account.  There will be no impact on General Fund or HRA Reserves. 
3. Proposals 
3.1 It is proposed that the Audit and Scrutiny Committee approves the accounting policies
as detailed in Appendix 1 
4. Implications/Socio-economic Duty 
Financial 
4.1 None.
80

Page 81

Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities and focussing our investment on
priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The council’s appointed external auditors for 2024/25, Audit Scotland, were consulted
on the changes detailed in this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
None 
81

Page 82

Appendix 1 
Accounting Policies 2024 to 2025 
General Principles 
The Accounts summarise the Council’s transactions for the 2024 to 2025 financial year and
its position at the year-end of 31 March 2025.  The Council is required to prepare an annual
Statement of Accounts by the Local Authority Accounts (Scotland) Regulations 2014 and
Section 12 of the Local Government in Scotland Act 2003 requires that they are prepared in
accordance with proper accounting practices.   
These practices, under Section 21 of the 2003 Act, primarily comprise the Code of Practice
on Local Authority Accounting in the United Kingdom 2023/24, supported by International
Financial Reporting Standards (IFRS) and statutory guidance under Section 12 of the 2003
Act. 
The accounting convention adopted in the financial statements is principally historical cost,
modified by the revaluation of certain categories of non-current assets and financial
instruments. 
The accounts have been prepared on a going concern basis. 
A Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are
made or received. In particular: 
• Revenue from contracts with service recipients, whether for services or the provision of
goods, is recognised when (or as) the goods or services are transferred to the service
recipient in accordance with the performance obligations of the contract.
• Supplies are recorded as expenditure when they are consumed. Where there is a gap
between the date supplies are received and their consumption, they are carried as
inventories on the Balance Sheet.
• Expenses in relation to services received (including services provided by employees) are
recorded as expenditure when the services are received rather than when payments are
made.
• Interest payable on borrowings and receivable on investments is accounted for on the
basis of the effective interest rate for the relevant financial instrument rather than the cash
flows fixed or determined by the contract. 
• Suppliers’ invoices paid in the two weeks following the year-end have been included
together with specific accruals in respect of further material items, provided the goods
and services were received prior to 31 March. 
• Where revenue and expenditure have been recognised but cash has not been received
or paid, a debtor or creditor for the relevant amount is recorded in the Balance Sheet. 
The de minimis level for recognition of such transactions has been agreed at £5,000,
therefore all known transactions of £5,000 or above have been included. 
• Where debts may not be settled, the balance of debtors is written down and a charge
made to revenue for the income that might not be collected. 
82

Page 83

B  Allocation of Central Support Costs
A proportion of net central support services is allocated to services outwith the general fund.
The balance of the net central support services is reported on the basis of how the services
are structured and how the Council operates, monitors and manages financial performance. 
C Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable
without penalty on notice of not more than 24 hours.  Cash equivalents are investments that
mature in three months or less from the date of acquisition and that are readily convertible to
known amounts of cash with insignificant risk of change in value. 
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts
that are repayable on demand and form an integral part of the Council’s cash management. 
D Prior Period Adjustments, Changes in Accounting Policies and Estimates and
Errors
Prior period adjustments may arise as a result of a change in accounting policies or to
correct a material error. Changes in accounting estimates are accounted for prospectively,
i.e. in the current and future years affected by the change and do not give rise to a prior
period adjustment. 
Changes in accounting policies are only made when required by proper accounting practices
or the change provides more reliable or relevant information about the effect of transactions,
other events and conditions on the Council’s financial position or performance. When a
change is made, it is applied retrospectively (unless otherwise stated) by adjusting opening
balances and comparative amounts for the prior period as if the new policy had always been
applied. 
Material errors discovered in prior years are corrected retrospectively by amending opening
balances and comparative amounts for the prior period. 
E Charges to Revenue for Non-Current Assets
Services are charged with the following amounts to record the cost of holding non-current
assets during the year: 
• Depreciation attributable to the assets used by the relevant service.
• Revaluation and impairment losses on assets used by the service where there are no
accumulated gains in the Revaluation Reserve against which the losses can be written
off. 
• Amortisation of intangible fixed assets attributable to the service. 
The Council is not required to raise council tax to cover depreciation, revaluation and
impairment losses or amortisation. However, it is required to make an annual contribution
from revenue towards the reduction in its overall borrowing requirement, equal to an amount
calculated on a prudent basis determined by the Council in accordance with the Statutory
Repayment of Loans Fund Advances. This is known as the Loans Fund Principal
Repayment. Depreciation, revaluation and impairment losses and amortisation are replaced
by the Loans Fund Principal Repayments in the General Fund Balance by way of an
adjusting transaction within the Capital Adjustment Account in the Movement in Reserves
Statement for the difference between the two. 
83

Page 84

F Employee Benefits 
Benefits Payable during Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the
year end. They include such benefits as salaries, wages, overtime and paid annual leave for
current employees and are recognised as an expense in the year in which employees render
service to the Council.  All salaries and wages earned up to 31 March are included in the
financial statements irrespective of when the payment was made. An accrual is made for the
cost of holiday entitlements earned by employees but not taken before the year-end and
which employees can carry forward into the next financial year.  The accrual is made at the
wage and salary rates applicable in the following year, being the period in which the benefits
will be taken. Such accruals are required, under statute, to be reversed out of the General
Fund Balance by a credit to the Accumulating Compensated Absences Adjustment Account
in the Movement in Reserves Statement. 
Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to
terminate an officer’s employment before the normal retirement date or an officer’s decision
to accept voluntary redundancy. They are charged on an accruals basis to the relevant
services line in the Comprehensive Income and Expenditure Statement at the point when the
offer of termination can no longer be withdrawn by the Council. Where termination benefits
include the enhancement of pensions, the General Fund balance is charged with the amount
payable by the Council to the pension fund or pensioner in the year. 
Post-Employment Benefits
The Council participates in two separate pension schemes: 
• The Scottish Teachers’ Pension Scheme administered by the Scottish Government.
• The Local Government (Scotland) Pension Scheme administered by the Strathclyde
Pension Fund.  
Both schemes provide defined benefits to members (retirement lump sums and pensions),
earned while employees work for the Council.  However, the arrangements for the teachers’
scheme mean that liabilities for these benefits cannot be identified specifically to the Council. 
The scheme is therefore accounted for as if it were a defined contributions scheme.  No
liability for future payments of benefits is recognised in the Balance Sheet and the Education
line in the Comprehensive Income and Expenditure Statement is charged with the
employer’s contributions payable to the Teachers’ Pension Scheme in the year. 
The Local Government Pension Scheme
The Local Government Pension Scheme (LGPS) is accounted for as a defined benefits
scheme. 
The assets and liabilities of Strathclyde Pension Fund attributable to the Council are
included in the Balance Sheet on an actuarial basis using the ‘projected credit unit method’,
i.e. an assessment of the future payments that will be made in relation to retirement benefits
earned to date by employees, based on assumptions about mortality rates, employee
turnover rates, etc., and projected earnings for current employees. 
Assets and liabilities are discounted to their value at current prices, as advised by the
actuaries, Hymans Robertson, using an appropriate discount rate.
84

Page 85

The assets and liabilities of Strathclyde Pension Fund attributable to North Ayrshire Council
are included in the Balance Sheet at their fair value: 
• Quoted securities – current bid price.
• Unquoted securities – professional estimate.
• Unitised securities – current bid price.
• Property – market value. 
The change in the net pension asset or liability is analysed into the following components: 
Service Costs:
• Current service cost – the increase in liabilities as a result of service earned by
employees this year. This is allocated in the Comprehensive Income and Expenditure
Statement to the services for which the employees worked.
• Past service cost (including curtailments) – the increase in liabilities as a result changes
to the scheme, including amendments or curtailments, where the changes impact on the
service earned by employees in previous years. These costs are charged to the Surplus
or Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement. 
• Net interest on the net defined benefit liability (asset), i.e. net interest expense for the
Council – the change during the period in the net defined benefit liability or asset that
arises from the passage of time. This is charged to the Financing and Investment Income
and Expenditure line in the Comprehensive Income and Expenditure Statement,
calculated by applying the discount rate used to measure the defined benefit obligation at
the beginning of the period – taking into account any changes in the net defined benefit
liability or asset during the period as a result of contribution and benefit payments. 
Remeasurements:
• Return on plan assets – excludes amounts included in net interest on the net defined
liability (asset). This is charged to the Pensions Reserve as Other Comprehensive
Income and Expenditure.
• Actuarial gains and losses – changes in the net pensions liability that arise because
events have not coincided with assumptions made at the last actuarial valuation or
because the actuaries have updated their assumptions. This is charged to the Pensions
Reserve as Other Comprehensive Income and Expenditure.
• Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s
contributions to the pension fund in settlement of liabilities. This is not accounted for as
an expense. 
Statutory provisions require the General Fund balance to be charged with the amount
payable by the Council to the pension fund or directly to pensioners in the year, not the
amount calculated according to the relevant accounting standards.  In the Movement in
Reserves Statement, this means that there are transfers to and from the Pensions Reserve
to remove the notional debits and credits for retirement or pension enhancement termination
benefits and replace them with charges for the cash paid to the pension fund and pensioners
and any such amounts payable but unpaid at the year-end.  The balance that arises on the
Pensions Reserve thereby measures the impact on the General Fund of being required to
account for retirement benefits on the basis of cash flows rather than as benefits earned by
employees. 
85

Page 86

Discretionary Benefits
The Council also has restricted powers to make discretionary awards to retirement benefits
in the event of early retirements. Any liabilities estimated to arise as a result of an award to
any member of staff, including teachers, are accrued in the year of the decision to make the
award and accounted for using the same policies as are applied to the Local Government
Pension Scheme. 
G Events After the Reporting Period 
These are events, both favourable and unfavourable, that occur between the end of the
reporting period (31 March) and the date when the financial statements are authorised for
issue.   
The Statement of Accounts are adjusted to reflect events where they provide evidence of
conditions that existed at the end of the reporting period. 
Where events indicate conditions, which arose after the reporting period, which would have
had a material effect, the Statement of Accounts are not adjusted but a disclosure is made in
the notes of the nature of the event and the estimated financial effect. 
Events taking place after the date of authorisation for issue are not reflected in the
Statement of Accounts. 
H Financial Instruments 
Financial Liabilities
Financial liabilities are recognised on the balance sheet when the Council becomes party to
the contractual provisions of a financial liability. Liabilities are initially measured at fair value
and then carried at amortised cost.  Annual charges to the Financing and Investment Income
and Expenditure line in the Comprehensive Income and Expenditure Statement for interest
payable are based on the carrying amount of the liability, multiplied by the effective interest
rate of the instrument. The effective interest rate is the rate that exactly discounts estimated
future cash payments over the life of the instrument to the amount at which it was originally
recognised. 
For most of the borrowings that the Council has, this means that the amount presented in
the balance sheet is the outstanding principal repayable (plus accrued interest) and interest
charged to the Comprehensive Income and Expenditure Statement is the amount payable
for the year according to the loan agreement. 
Costs associated with debt restructuring (premiums and discounts) are charged to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement in the year of repayment of the original debt in accordance with
accounting regulations. 
Where premiums and discounts have been charged to the Comprehensive Income and
Expenditure Statement, regulations permit the costs of restructuring to be released to
revenue over the period of the replacement loan.  The reconciliation of amounts charged to
the Comprehensive Income and Expenditure Statement to the net charge required against
the General Fund balance is managed by a transfer to or from the Financial Instruments
Adjustment Account in the Movement in Reserves Statement.
86

Page 87

Financial Assets
Financial assets are classified and measured based on the reasons, or business model, for
holding the financial assets and the characteristics of the anticipated cash flows. There are
three main classes of financial assets measured at: 
• Amortised cost.
• Fair value through profit or loss.
• Fair value through other comprehensive income. 
The Council’s business model is to hold assets to collect contractual cash flows and our
financial assets are therefore classified as amortised cost. 
Financial Assets Measured at Amortised Cost
Financial assets measured at amortised costs are recognised on the Balance Sheet when
the Council becomes party to the contractual provisions of a financial asset and are initially
measured at fair value and then carried at amortised cost. Annual credits to the Financing
and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement for interest receivable are based on the carrying amount of the asset multiplied by
the effective rate of interest for the instrument. For the financial assets held by the Council,
this means that the amount presented in the Balance Sheet is the outstanding principal
receivable (plus accrued interest) and interest credited to the Comprehensive Income and
Expenditure Statement is the amount receivable for the year in the loan agreement. 
Any gains or losses which arise on the derecognition of an asset are credited or debited to
the Financing and Investment Income and Expenditure line in the Comprehensive Income
and Expenditure Statement. 
Expected Credit Loss Model
Potential impairment losses on Financial Assets Measured at Amortised Cost are
determined using the Expected Credit Loss Model. The Council recognises expected credit
losses on all of its financial assets held at amortised cost, either on a 12-month or lifetime
basis. Only lifetime losses are recognised for trade receivables (debtors). 
Impairment losses are calculated to reflect the expectation that the future cash flows may not
take place because the borrower may default on their obligations. Credit risk plays a crucial
part in assessing the potential losses. Where risk has increased significantly since an asset
was recognised, losses are assessed on a lifetime basis. Where risk has not increased
significantly or remains low, losses are assessed on the basis of 12-month expected losses. 
For any identified impairment losses, a charge is made to the Financing and Investment
Income and Expenditure line in the Comprehensive Income and Expenditure Statement.   
I Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party
contributions and donations are recognised as due to the Council when there is reasonable
assurance that: 
• The Council will comply with the conditions attached to the payments.
• The grants or contributions will be received.
87

Page 88

Amounts recognised as due to the Council are not credited to the Comprehensive Income
and Expenditure Statement until conditions attached to the grant have been satisfied. 
Monies advanced as grants and contributions for which conditions have not been satisfied
are carried in the Balance Sheet as creditors.  When conditions are satisfied, the grant or
contribution is credited to the relevant service line (for revenue grants) or Taxation and Non-
Specific Grant Income (for non-ring-fenced revenue grants and all capital grants). 
Capital grants are then reversed out of the General Fund Balance in the Movement in
Reserves Statement. Where the grant has yet to be used to finance capital expenditure, it is
posted to the Capital Grants Unapplied Account within the Capital Fund.   
Capital grants which are used and amounts previously posted to the Capital Grants
Unapplied Account which have now been applied, are transferred to the Capital Adjustment
Account. 
J  Heritage Assets 
A heritage asset is defined as a tangible asset with historical, artistic, scientific,
technological, geophysical or environmental qualities that is held and maintained principally
for its contribution to knowledge and culture. 
The Council holds heritage assets consisting of civic regalia and silverware, historical
artefacts, fine art and public artworks. The assets are held at valuation and no depreciation
is charged on the assets. Expenditure to maintain the assets is written off to the
Comprehensive Income and Expenditure Statement  in the year of expenditure. Donated
heritage assets are reflected in the balance sheet at valuation with a gain equivalent to the
value of the asset reported in the Comprehensive Income and Expenditure Statement in the
year of donation. 
Measurement
The Council’s heritage assets are recognised on the Balance Sheet at values determined by
specialist external valuers and by experienced officers within the Connected Communities
service.  Valuations have been largely undertaken on an insurance basis at retail level.  Only
items deemed to have a value of £10,000 and above have been disclosed in the Balance
Sheet.   
Disclosure
Not all of the Council’s identified heritage assets will be disclosed in the Balance Sheet.  It is
not deemed practicable to obtain external valuations for all items defined as heritage assets. 
These include: Museum and Gallery items with a value of less than £10,000, Castles,
Monuments and War Memorials. 
K Intangible Assets 
Expenditure on non-monetary assets that do not have physical substance but are controlled
by the Council as a result of past events (e.g. software licences) is capitalised when it is
expected that it will bring benefits to the Council for more than twelve months. Intangible
assets are measured initially at cost.  Amounts are not revalued, as the fair value of the
assets held by the Council cannot be determined by reference to an active market.  The
depreciable amount of an intangible asset is amortised over its useful life (generally between
88

Page 89

5 and 10 years) to the relevant service line(s) in the Comprehensive Income and
Expenditure Statement.   
L  Interest in Companies and Other Entities
The Council has interests in companies and other entities which have the nature of
subsidiaries, associates and joint ventures and require it to prepare group accounts. In the
Council’s single entity accounts, these interests are recorded as financial assets at cost, less
any provision for losses. 
M  Internal Transactions
Internal transactions between operational segments of the Council are included within the
management accounts for budgetary control purposes only. All internal transactions between
services have been excluded from the service expenditure analysis within the
Comprehensive Income and Expenditure Statement resulting in reductions in both the gross
expenditure and gross income reported, with no overall net impact. 
N Inventories 
Inventories include consumable stock and work-in-progress and are recognised in the
Balance Sheet at the lower of cost and net realisable value. The valuation of work-in-
progress has been made at cost plus an appropriate proportion of overheads, together with
attributable profits and allowances for foreseeable losses. 
O Investment Properties 
Investment properties are those that are used solely to earn rentals and/or for capital
appreciation. Investment properties are measured initially at cost and subsequently at fair
value, being the price that would be received to sell such an asset in an orderly transaction
between market participants at the measurement date. As a non-financial asset, investment
properties are measured at highest and best use. Properties are not depreciated but
reviewed annually and revalued regularly to ensure their carrying value reflects market
conditions at the year-end.   
P Leases 
The Council adopted IFRS 16 (Leases) with effect from 1 April 2024. The main impact of the
requirements of IFRS 16 is that, for arrangements previously accounted for as operating
leases (i.e. without recognising the leased vehicles, plant, equipment, property and land as
an asset, and future rents as a liability), a right-of-use asset and a lease liability are now
included on the balance sheet from 1 April 2024. 
As noted under policy R Public Private Partnership, Non Profit Distributing and similar
contracts, with effect from 1 April 2024 IFRS16 also applies to Service Concession
Agreements and recognition of the resultant remeasurement of the lease liability. 
The Council as Lessee
The Council classifies contracts as leases based on their substance. Contracts and parts of
contracts, including those described as contracts for services, are analysed to determine
whether they convey the right to control the use of an identified asset, through rights both to
obtain substantially all the economic benefits or service potential from that asset and to
direct its use. The scope of IFRS 16 Leases has been expanded to include arrangements
with nil consideration, peppercorn or nominal payments. 
89

Page 90

Initial measurement
Leases are recognised as right-of-use assets with a corresponding liability at the date from
which the leased asset is available for use (or from 1 April 2024, if later). The leases are
typically for fixed periods in excess of one year but may have extension options. The Council
initially recognises lease liabilities measured at the present value of lease payments,
discounting by applying the Council’s incremental borrowing rate wherever the interest rate
implicit in the lease cannot be determined. Lease payments included in the measurement of
the lease liability include: 
• Fixed payments, including in-substance fixed payments.
• Variable lease payments that depend on an index or rate, initially measured using the
prevailing index or rate as at the adoption date.
• Amounts expected to be payable under a residual value guarantee.
• The exercise price under a purchase option that the authority is reasonably certain to
exercise.
• Lease payments in an optional renewal period if the authority is reasonably certain to
exercise an extension option.
• penalties for early termination of a lease, unless the authority is reasonably certain not to
terminate early. 
The right-of-use asset is measured at the amount of the lease liability, adjusted for any
prepayments made, plus any direct costs incurred to dismantle and remove the underlying
asset or restore the underlying asset on the site on which it is located, less any lease
incentives received. 
However, for peppercorn, nominal payments or nil consideration leases, the asset is
measured at fair value. 
Subsequent measurement
The right-of-use asset is subsequently measured using the fair value model. The Council
considers the cost model to be a reasonable proxy except for: 
• Assets held under non-commercial leases.
• Leases where rent reviews do not necessarily reflect market conditions.
• Leases with terms of more than five years that do not have any provision for rent reviews.
• Leases where rent reviews will be at periods of more than five years. 
For these leases, the asset is carried at a revalued amount. In these financial statements,
right-of-use assets held under index-linked leases have been adjusted for changes in the
relevant index, while assets held under peppercorn or nil consideration leases have been
valued using market prices or rentals for equivalent land and properties. 
The right-of-use asset is depreciated straight-line over the shorter period of remaining lease
term and useful life of the underlying asset as at the date of adoption. 
The lease liability is subsequently measured at amortised cost, using the effective interest
method. 
The liability is remeasured when:
• There is a change in future lease payments arising from a change in index or rate.
90

Page 91

• There is a change in the group’s estimate of the amount expected to be payable under a
residual value guarantee.
• The authority changes its assessment of whether it will exercise a purchase, extension or
termination option.
• There is a revised in-substance fixed lease payment. 
When such a remeasurement occurs, a corresponding adjustment is made to the carrying
amount of the right-of-use asset, with any further adjustment required from remeasurement
being recorded in the income statement. 
Low value and short lease exemption
The Council has elected to apply recognition exemptions to low value assets (below £10,000
when new) and to short term leases i.e. existing leases that expire on or before 31 March
2025, and new leases with a duration of less than 12 months. 
Lease expenditure
Expenditure in the Comprehensive Income and Expenditure Statement includes interest,
straightline depreciation, any asset impairments and changes in variable lease payments not
included in the measurement of the liability during the period in which the triggering event
occurred. Lease payments are debited against the liability. Rentals for leases of low-value
items or shorter than 12 months are expensed. 
Depreciation and impairments are not charges against council tax, as the cost of non-current
assets is fully provided for under separate arrangements for capital financing. Amounts are
therefore appropriated to the capital adjustment account from the General Fund balance in
the Movement in Reserves Statement. 
Rentals paid under operating leases for vehicles, plant and equipment are charged to the
appropriate service account in the Comprehensive Income and Expenditure Statement as an
expense of the services benefiting for use of the leased assets. 
The Council as Lessor
North Ayrshire Council has no finance leases where the Council is the lessor.   
The Council leases out property under non-cancellable leases. Income received is
recognised in the Comprehensive Income and Expenditure Statement against the services
managing the leases. Where the Council grants an operating lease over a property or an
item of plant or equipment, the asset is retained in the Balance Sheet.   
Q Property, Plant and Equipment 
Assets that have physical substance and are held for use in the supply of services, for rental
to others, or for administrative purposes and that are expected to be used during more than
one financial year are classified as Property, Plant and Equipment. 
All valuations of land and buildings are carried out by Royal Institution of Chartered
Surveyors qualified valuers, with the exception of valuations of council dwellings which are
based on beacon values calculated by the District Valuer. Both valuations are in accordance
with the methodologies and bases of estimation as set out in the professional standards of
Royal Institution of Chartered Surveyors. 
91

Page 92

Recognition
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is
capitalised on an accruals basis. Expenditure that merely maintains the condition of an asset
(i.e. repairs and maintenance) is charged as an expense when it is incurred.   
The Council has a de minimis level of £10,000 for expenditure to be classed as capital. 
Land and Buildings with a valuation below £10,000 are not recognised on the Council
Balance Sheet. 
Measurement
Assets are initially measured at cost, comprising: 
• The purchase price. 
• Any costs attributable to bringing the asset to the location and condition necessary for it
to be capable of operating in the manner intended. 
The Council does not capitalise borrowing costs incurred whilst assets are under
construction. 
The cost of any asset acquired other than by purchase is deemed to be its fair value. 
Assets are carried on the Balance Sheet using the following measurement bases: 
• Council Dwellings - Fair value, determined using the basis of existing use value for social
housing.
• Other Land and Buildings - Fair value, determined by the amount that would be paid for
the asset in its existing use. Where there is no market-based evidence of fair value
because of the specialist nature of an asset, depreciated replacement cost is used as an
estimate of fair value.
• Other Land and Buildings (Schools) - Fair value, because of the specialist nature of the
asset, depreciated replacement cost is used as an estimate of fair value.
• Vehicles, Plant and Equipment - depreciated historical cost.
• Infrastructure Assets - depreciated historical cost.
• Community Assets - depreciated historical cost.
• Surplus Assets - fair value based on market value in highest and best use.
• Assets Under Construction - historical cost.
• Investment Properties (Common Good and Trusts only) - fair value based on market
value in highest and best use. 
Assets included in the Balance Sheet at fair value are revalued on a rolling basis over a
period not exceeding 5 years, with the exception of Surplus Assets and Investment
Properties which are revalued annually. 
Where a sample of assets in each category has been valued in the current financial year, the
change in values for the sample assets shall be assessed and extrapolated to determine if a
potential material movement in the value of all assets within that category is indicated. The
materiality threshold has been determined as 1.5% of the previous formal valuation, for 2024
to 2025 this is equivalent to £15.8m. Where a material movement is indicated, this will be
disclosed within the annual accounts and additional valuation work will be undertaken in
92

Page 93

conjunction with colleagues from the Royal Institute of Chartered Surveyors to assess the
valuations of all other assets within that category. 
Increases in valuations are matched by credits to the Revaluation Reserve to recognise
unrealised gains. Where decreases in value are identified, the revaluation loss is accounted
for as follows: 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve,
the carrying amount of the asset is written down against that balance (up to the amount of
the accumulated gains).
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying
amount of the asset is written down against the relevant service line(s) in the
Comprehensive Income and Expenditure Statement. 
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the
date of its formal implementation.  Gains arising before that date have been consolidated
into the Capital Adjustment Account. 
Impairment
Assets are assessed at each year-end to establish whether there is any indication that an
asset may be impaired.  Where indications exist, and any possible differences are estimated
to be material, the recoverable amount of the asset is estimated and, where this is less than
the carrying amount of the asset, an impairment loss is recognised for the shortfall. 
Where impairment losses are identified, they are accounted for as follows: 
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve,
the carrying amount of the asset is written down against that balance (up to the amount of
the accumulated gains).
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying
amount of the asset is written down against the relevant service line(s) in the
Comprehensive Income and Expenditure Statement. 
Where an impairment loss is subsequently reversed, the reversal is credited to the relevant
service line(s) in the Comprehensive Income and Expenditure Statement, up to the amount
of the original loss, adjusted for depreciation that would have been charged if the loss had
not been recognised. 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets. An exception is
made for assets without a determinable finite useful life (i.e. freehold land and certain
Community Assets) and assets that are not yet available for use (i.e. assets under
construction).  Investment Properties and Assets Held for Sale are not subject to
depreciation. 
Depreciation is charged on a straight-line basis over the useful life of the assets (as advised
by a suitably qualified officer).  Depreciation is charged in the year of acquisition but not in
the year of sale. 
93

Page 94

Where a Property, Plant and Equipment asset has major components whose cost is
significant in relation to the total cost of the item, the components are depreciated
separately. For the purposes of component accounting the Council considers significant
components being those with a cost that is at least 20% of the overall cost of the asset. 
Individual assets shall be disregarded for component accounting where their carrying value
is below £2m. 
Revaluation gains are also depreciated, with an amount equal to the difference between
current value depreciation charged on assets and the depreciation that would have been
chargeable based on their historical cost being transferred each year from the Revaluation
Reserve to the General Fund. 
Disposals
When it becomes probable that the carrying amount of an asset will be recovered principally
through a sale transaction rather than through its continuing use, it is reclassified as an
Asset Held for Sale.  The asset is revalued immediately before reclassification and then
carried at the lower of this amount and fair value less costs to sell.  Where there is a
subsequent decrease to fair value less costs to sell, the loss is posted to the Other
Operating Expenditure line in the Comprehensive Income and Expenditure Statement. 
Gains in fair value are recognised only up to the amount of any previously recognised
losses.  Depreciation is not charged on Assets Held for Sale. 
Property, land and buildings are classified as ‘held for sale’ when the following criteria are
met: 
• The property is available for sale in its present condition.
• The sale is highly probable.
• The asset is being actively marketed for sale at a price that is reasonable in relation to its
current fair value.
• The sale is expected to qualify for recognition as a completed sale within one year. 
When an asset is disposed of or decommissioned, the carrying amount of the asset in the
Balance Sheet is written off to the Other Operating Expenditure line in the Comprehensive
Income and Expenditure Statement as part of the gain or loss on disposal.  Receipts from
disposals are credited to the same line in the Comprehensive Income and Expenditure
Statement as part of the gain or loss on disposal.  Any revaluation gains accumulated for the
asset in the Revaluation Reserve are transferred to the Capital Adjustment Account. 
To comply with statutory guidance, this gain or loss is excluded when determining the
General Fund balance within the Movement in Reserves Statement. 
The Council has determined, in accordance with Local Government Circular 09/2022
Statutory Override Accounting for Infrastructure Assets for Scottish Local Authorities, that
the carrying amount to be derecognised in respect of a replaced part of an infrastructure
asset is to be taken to be, and accounted for, as a nil amount. In accordance with the
circular the Council is not required to make subsequent adjustments to the carrying amount
of the asset with respect to that part. 
94

Page 95

R Public Private Partnership, Non Profit Distributing and similar contracts 
Public Private Partnership, Non Profit Distributing and similar contracts are agreements to
receive services, where the responsibility for making available the property, plant and
equipment needed to provide the services passes to the Public Private Partnership or Non
Profit Distributing contractor.  As the Council is deemed to control the services that are
provided under its Public Private Partnership or Non Profit Distributing contractor schemes
and as ownership of the property, plant and equipment will pass to the Council at the end of
the contracts for no additional charge, the Council carries the assets used under the
contracts on its Balance Sheet as part of Property, Plant and Equipment. 
The original recognition of these assets at fair value (based on the cost to purchase the
property, plant and equipment) was balanced by the recognition of a liability for amounts due
to the scheme operator to pay for the capital investment.  For North Ayrshire Council
Schools PPP contract, the liability was written down by an initial capital contribution of
£1.743 million. 
The amounts payable to the Public Private Partnership or Non Profit Distributing contractor
operators each year are analysed into four elements: 
• Service charges and lifecycle replacement costs – value of services including cleaning
and janitorial services, repairs and maintenance, energy, non domestic rates and
insurances debited to the relevant service in the Comprehensive Income and Expenditure
Statement.
• Interest payments – the interest charge on the outstanding Balance Sheet liability,
debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement.
• Contingent rent – increases in the amount to be paid for the property arising during the
contract, debited to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement.
• Liability repayment– repayment of the principal owed to the Public Private Partnership
operator, applied to write down the Balance Sheet liability. 
With effect from 1 April 2024, IFRS 16 (Leases) also applies to service concession
arrangements. Under IFRS16, where indexation affects future service concession payments,
the lease liability requires to be remeasured. Instead of expensing the increased payment,
the net present value of future payments that comprise the liability is recalculated based on
the revised level of payments. 
In accordance with Scottish Local Government Finance Circular 10/2022, the Council has
applied a statutory accounting flexibility to the Public Private Partnership and Non Profit
Distributing contracts to realign the value of the Liability Repayment element of the unitary
charge to reflect a prudent charge for the repayment of the Liability across the useful
economic life of the assets. 
S Provisions, Contingent Liabilities and Contingent Assets 
Provisions
Provisions are made where an event has taken place that gives the Council a legal or
constructive obligation that probably requires settlement by a transfer of economic benefits
or service potential, and a reliable estimate can be made of the amount of the obligation. 
95

Page 96

For instance, the Council may be involved in a court case that could eventually result in the
making of a settlement or the payment of compensation. 
Provisions are charged as an expense to the appropriate service line in the Comprehensive
Income and Expenditure Statement in the year that the Council becomes aware of the
obligation, and measured at the best estimate, at the balance sheet date, of the expenditure
required to settle the obligation, taking into account relevant risks and uncertainties. 
When payments are eventually made, they are charged to the provision carried in the
balance sheet.  Estimated settlements are reviewed at the end of each financial year; where
it becomes less than probable that a transfer of economic benefits will be required (or a
lower settlement than anticipated is made); the provision is reversed and credited back to
the relevant service. 
Where some or all of the payment required to settle a provision is expected to be recovered
from another party (e.g. from an insurance claim), this is only recognised as income for the
relevant service if it is virtually certain that reimbursement will be received if the Council
settles the obligation. 
Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible
obligation, whose existence will only be confirmed by the occurrence or otherwise of
uncertain future events not wholly within the control of the Council.  Contingent liabilities also
arise in circumstances where a provision would otherwise be made but either it is not definite
that an outflow of resources will be required, or the amount of the obligation cannot be
measured reliably. 
Contingent liabilities are not recognised in the balance sheet but disclosed in a note to the
accounts. 
Contingent Assets
A contingent asset arises where an event has taken place that gives the Council a possible
asset whose existence will only be confirmed by the occurrence or otherwise of uncertain
future events not wholly within the control of the Council. 
Contingent assets are not recognised in the balance sheet but disclosed in a note to the
accounts where it is probable that there will be an inflow of economic benefits or service
potential. 
T Reserves 
Reserves are created by appropriating amounts out of the General Fund Balance in the
Movement in Reserves Statement.  When expenditure to be financed from a reserve is
incurred, it is charged to the appropriate service in that year to score against the Surplus or
Deficit on the Provision of Services in the Comprehensive Income and Expenditure
Statement.  The reserve is then appropriated back into the General Fund Balance in the
Movement in Reserves Statement so that there is no net charge against council tax for the
expenditure. 
Certain reserves are kept to manage the accounting processes for non-current assets,
financial instruments and retirement benefits and do not represent usable resources for the
Council.  These reserves are explained in the relevant notes.
96

Page 97

U Revenue Expenditure Funded from Capital Under Statute 
Expenditure incurred during the year that may be capitalised under statutory provisions but
does not result in the creation of a non-current asset is charged as expenditure to the
relevant service in the Comprehensive Income and Expenditure Statement in the year. 
Where the Council has determined to meet the cost of this expenditure from existing capital
resources or by borrowing, a transfer in the Movement in Reserves Statement from the
General Fund Balance to the Capital Adjustment Account then reverses out the amounts
charged so that there is no impact on the level of council tax. 
V VAT 
All income and expenditure excludes amounts relating to Value Added Tax, as all Value
Added Tax collected is payable to His Majesty’s Revenue and Customs and net Value
Added Tax paid is fully recoverable by the Council. 
W Fair Value Measurement 
The Council values some of its non-financial assets, such as Surplus Assets and Investment
Properties (Common Good Funds and Trusts only), and some of its financial instruments at
Fair Value.  Fair Value is the price that would be received either on the sale of an asset or to
transfer a liability in an orderly transaction between market participants at the measurement
date.  The Fair Value measurement assumes that the transaction to sell the asset or transfer
the liability takes place either: 
• In the principal market for the asset.
• In the absence of a principal market, in the most advantageous market for the asset. 
The Council measures the Fair Value of an asset or liability using the assumptions that
market participants would use when pricing the asset or liability, assuming that market
participants act in their economic best interest. 
When measuring the Fair Value of a non-financial asset, the Council takes into account a
market participant’s ability to generate economic benefits by using the asset in its highest
and best use or by selling it to another market participant that would use the asset in its
highest and best use. The Council uses valuation techniques that are appropriate in the
circumstances and for which sufficient data is available, maximising the use of relevant
observable inputs and minimising the use of unobservable inputs. 
Inputs to the valuation techniques in respect of assets and liabilities for which Fair Value is
measured or disclosed in the Council’s financial statements are categorised within the fair
value hierarchy, as follows: 
• Level 1 – quoted prices (unadjusted) in active markets for identical assets or liabilities that
the Council can access at the measurement date.
• Level 2 – inputs other than quoted prices included within Level 1 that are observable for
the asset or liability, either directly or indirectly.
• Level 3 – unobservable inputs for the asset or liability. 
97

Page 98

98

Page 99

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit & Scrutiny Committee
Title: Strategic Risk Register 2025/26
Purpose: To inform the Committee of the Council's agreed Strategic
Risk Register for 2025/26.
Recommendation:           That Committee notes the Strategic Risk Register for 2025/26. 
1. Executive Summary 
1.1 The Strategic Risk Register has been reviewed and updated for 2025/26. 
1.2 It is recommended that seven of the eight previous risks remain on the Strategic Risk
Register (SRR) at their existing risk scores. 
1.3 The Financial Sustainability of the Health and Social Care Partnership risk has
increased in risk scoring from 20 to 25. 
2. Background
2.1 North Ayrshire Council is committed to ensuring that it is proactive in identifying and
managing the risks impacting on the authority. The Council recognises that a certain
amount of risk is inevitable if the organisation is to achieve its objectives.
2.2 The aim of risk management is to reduce the likelihood and/or impact of risk by
identifying and controlling risks to the Council. If risk is to be managed appropriately,
and Services are aware of these risks, risk management can contribute positively
towards the organisation's decision-making processes, making the Council more
innovative and effective in its approach to service delivery. 
2.3 The most significant risks are identified through the Council's Strategic Risk Register,
recognising the challenges facing the Council and demonstrating the arrangements in
place to manage these risks. 
2.4 The Strategic Risk Register has been reviewed and updated for 2025/26 and is
attached at Appendix 1 to this report. For each of the risks detailed within the register
a number of components are identified: 
• Risk proximity factors;
Agenda Item 9
99

Page 100

• Risk score;
• Potential effect on the Council's priorities;
• Internal controls currently in place;
• Assessment of controls; and
• Additional actions identified. 
2.5 To assist in the assessment of each risk, the Council’s agreed risk matrix was used to
ensure consistency. This is used to assess the likelihood of occurrence (on a scale
from 1 to 5) and the significance of the impact of the risk should it occur (on a scale
from 1 to 5). The risk score is the product of likelihood multiplied by impact. Only those
risks rated as high or very high (10 or above) will feature on the Strategic Risk
Register to ensure a focus on managing the most significant risks. 
2.6 Seven risks remain on the Strategic Risk Register at their existing risk scores – all
risks except the Financial Sustainability of the Health and Social Care Partnership
which has increased. 
2.7 The Financial Sustainability of the Health and Social Care Partnership risk has
increased in risk from score 20 to 25 due to continuously increasing budget pressures.
The risk likelihood has gone from a score of 4 to 5. This risk previously increased from
16 to 20 in the previous update at mid-year. 
2.8 This risk is now scored at the maximum level possible both in terms of impact and
likelihood after existing controls have been applied. 
2.9 Very High Risks 
• Financial Sustainability – this risk reflects the ongoing financial challenge
faced by the Council year on year (risk score 20).
• Financial Sustainability of the Health and Social Care Partnership – this
reflects the significant ongoing financial challenges faced by the Partnership and
the risk these present to the Council which are increasing (risk score 25). This
matter is currently being addressed by the Council through current financial
performance reporting governance and through the recent Budget setting
process for 2025/26. However it should be stressed that this position continues
to present significant challenges for the financial sustainability of the Council.
• Inequalities – this highlights the socio-economic inequalities faced in North
Ayrshire (risk score 20).
• Community Capacity Building and Empowerment – this highlights the
challenges associated with the community empowerment act (risk score 20).
• Property Asset Risk – This reflects the impact of long-term restricted budgets
on the Councils ability to maintain these to a good standard (risk score 20). 
High Risks
• Cyber Security – this reflects the ongoing risk from external cyber-attack which
is being faced by all organisations (risk score 16).
• Transformation – this reflects the wider risks associated with delivering the
current Transformation Programme and developing a pipeline of future initiatives
(risk score 12). It is recognised there remains a need for wider reform in order to
100

Page 101

fully address the financial challenges faced by the Council over the medium and
longer-term.
• Climate Change – this risk has been on the Strategic Risk Register following the
declaration by the Council of a Climate Change Emergency during 2019 (risk
score 16). 
2.10 Council services have identified high level strategic actions within their planning for
2025/26 to help the Council mitigate against its strategic risks. These actions are
detailed in summary format in the Risk Management Action Plans following each Risk
within Appendix 1. These actions will assist with performance monitoring and
reporting on the strategic risks. 
2.11 The Council’s Internal Audit Plan 2025/26 is scheduled to be approved at the Audit
and Scrutiny Committee on 13 March 2025 and is risk-based with clear links in place
between the audit plan and key risks the Council faces. 
Longer-term risks & Horizon Scanning 
2.12 The Strategic Risk Register identifies the most significant risks which the Council
faces at the present time. 
2.13 The Corporate Risk Management Group identifies any new relevant risks though
internal reviews and external horizon scanning utilising a number of sources. 
3. Proposals 
3.1 Committee is requested to note the Strategic Risk Register for 2025/26. 
4. Implications/Socio-economic Duty
Financial
4.1 The Council continues to have a robust long- and medium-term financial planning
framework. Key strands include development of key transformation themes and the
establishment of an Investment Fund that will generate future savings alongside
delivery of a number of key Council priorities.
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 The risk to the Council is that North Ayrshire residents, and in particular certain
groups, will experience increasing levels of poverty and its effects. Current control
measures fall into two categories - measures to address the root causes of socio-
101

Page 102

economic inequalities - income through employment or benefits – and mitigation
measures to minimise the impacts of poverty. 
Climate Change and Carbon 
4.5 The Council has declared a climate change emergency and has in place an
Environmental Sustainability and Climate Change Strategy. Significant work to help
mitigate the risk of flooding is included within the Capital Plan. The Council is
undertaking an ambitious renewable energy programme. 
Key Priorities 
4.6 A successful risk management framework helps to underpin the delivery of the
Council’s strategic priorities in Our Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The Strategic Risk Register has been reviewed in consultation the Corporate Risk
Management Group and relevant Chief Officers. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Alex Fitzharris, Team Manager (Risk), on 01294-
324515. 
Background Papers
None.
102

Page 103

Appendix 1 - Strategic Risk Report 2025/26 
Risk Code SRR2526_R01 Risk Title Financial Sustainability Latest Note Date 26-Feb-2025
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The risk is that the level of funding from Scottish Government
to local government falls significantly below the level required
to operate services effectively. This will require the Council to
take increasingly difficult and challenging decisions. The
revised 2025/26 local government settlement represents an
increase in core funding of £7.254m (2.05%). This is against a
backdrop of significant inflationary cost increases and risks,
including and anticipated shortfall in funding for employer
national insurance contributions for direct staff of £2.647m.
The North Ayrshire position is further affected by a reducing
overall population demographic and a growing elderly
population. This will further impact the Council’s share of
funding across the short, medium and long term.
Although there is a commitment through the Verity House
agreement for Councils and Scottish Government to work
together there continues to be challenges around the level of
flexibility the Council has on key areas of Budget, most notable
in areas like HSCP funding and funding for teachers and
support staff, where conditions remain. In 2024/25 in-year cost
pressures across the Council’s General Fund and the Health
and Social Care Partnership present a significant risk to the
sustainability of the Council’s finances. The General fund
currently projects an in-year overspend of £0.3m and the
HSCP has an overall projected outturn of £5.824m for
2024-25, reduced to £4.415m through identified financial
recovery actions. The NAC element of this as a funding partner
is a year-end overspend of £4.285m, reduced to £3.106m
through recovery actions. There is an increasing risk to
achieving financial balance during 2024-25. The Scottish
Government has passed legislation to give Councils powers to
charge additional council tax for second homes. This is an area
the Council will consider within the context of local
circumstances and island communities. 
Scottish Government funding to support the Council’s capital
programme has also not kept pace with rising costs. Set
against high inflationary driven construction costs there is a
risk that the 10-year capital programme will be unaffordable.
This could require projects to be reduced in scale or even
ceased.
Funding not keeping pace with demand
and inflationary cost pressures means that
there will be a reduction in some service
areas potentially resulting in higher risks
for service users. The future delivery of
balanced budgets will become increasingly
challenging. The capital programme could
also be significantly impacted leading to
reduced levels of capital investment.
Robust monitoring of the Council’s revenue and
capital budgets is in place as well as regular
reporting of financial performance of the IJB to
Cabinet and Audit and Scrutiny.
To assist financial planning The Medium and Long-
Term Financial Outlook (LTFO) to 2033/34 was
approved at Council on 13 December 2023 – this is
the cornerstone of the Council's financial planning in
the medium to long term. 
The annual budget process for the General Fund
revenue and Capital Programmes and financial
performance monitoring process will continue to
provide the framework from which control measures
will continue in addressing the financial position. 
Delivery of the Council’s Change Programme is also
vital in addressing the Budget challenges and this is
being progressed by the Council’s Transformation
Board, which is chaired by the Chief Executive. 
Utilising the Council’s available statutory powers is
another important area in addressing the financial
challenges. 
4 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Increasing Risk 20
103

Page 104

Strategic Risk Action Plan Date Updated 26-Feb-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Regular financial monitoring of Revenue and Capital Budgets. 
11 September 2024:
Ongoing financial monitoring process across capital and revenue, including
identification of measures to address in-year position. 
26 Feb 2025:
Recent finance reports trending towards break-even position for the Council’s
general fund. Major challenges remain however regarding the financial
performance of the IJB. The Council will require to make interim funds
available to the IJB in 2024/25 and this will be on the basis of repayment in
future years. This will be considered by Cabinet. 
31-Mar-2025  Mark Boyd 
Maintain Financial Governance Arrangements for IJB. 
11 September 2024:
New Finance Working Group set up to address in-year and medium-term
pressures. Includes representation from the HSCP, Health and the Council,
Main focus is on development of a finance recovery plan. 
26 Feb 2025:
The Finance Working group continues to progress transformation and
recovery actions, however it is unlikely it will achieve financial balance in
2024/25. Information continues to be reported through to the Council’s
Cabinet 
31-Mar-2025  Mark Boyd 
Progress dialogue via COSLA with Scottish Government on a range of
areas including fair funding, multi-year settlements, reduction in levels of
ring-fenced resources, true costs of SG policy areas, financial flexibilities
and a New Deal partnership with SG and local government. 
11 September 2024:
Discussions ongoing, however, SG have just announced £0.5Billion of cuts
Further dialogue being progressed around teacher number restrictions and
areas of revenue generation. 
26 Feb 2025:
Further progress made in this area as part of the Local Government
settlement through reduced levels of ring-fencing, however, further progress
needs to be made as consitions remain around teacher numbers and HSCP
funding. Financial flexibilities have been progressed by the Council through
approval of 100% premium for second home-owners council tax and through
a review of non-domestic rates empty property relief 
31-Mar-2025  Mark Boyd 
Develop the 2025/26 to 2027/28 revenue budget (medium-term financial
strategy) and capital programme taking account of all pressures and
savings via Directorates and Transformation programme. 
11 September 2024:
The 2025/26 Budget process has commenced earlier, in view of the current
financial challenges. Special Council meeting arranged for 9 October, 2024 to
set out the financial outlook and outline initial proposals as part of a 
26-Feb-2025  Mark Boyd 
104

Page 105

community engagement programme to commence from 10 October, 2024. 
26 Feb 2025:
Medium-Term financial plan approved by Council on 26 February 2025,
included over £4m of savings and a 7% increase in council tax. The budget
also included a £4m risk provision to help manage the risks and pressures
facing the Council. The Budget also included additional funding contribution to
the HSCP of £2.114m plus a further £0.759m funding from the Council to
ensure 100% funding in respect of employers national insurance contribution.
This element of pressure being borne by the council.   
105

Page 106

Risk Code SRR2526_R02 Risk Title Inequalities Latest Note Date 16-Jan-2025
Risk Owner Caroline Cameron; Sam Anson; David Hammond
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
North Ayrshire residents, and
in particular certain excluded
groups, will experience
increasing levels of poverty
and its effects, as a result
both of the economic
situation and further public
sector funding challenges.
Health inequality is closely
linked to poverty,
employment and people's
earliest experiences as
children, and will increase. 
The population of North
Ayrshire is projected to fall
over the next 10 years but
there will also be a larger
proportion of the population
considered dependent (not
economically active).
The impact on specific risk
groups is greatest for our
children, young people and
families, unemployed
people and those in in-
work poverty and people
exposed to the risks of
drug and alcohol addiction.
Demand for HSCP and
Council Services will
increase. 
As reductions in resources
increase, early intervention
and prevention activities
are at risk, thus increasing
the potential for an
increase in costly crisis
interventions. 
The local economy will be
impacted by reduced
spending power by
economically inactive
residents.
The HSCP re-affirmed its commitment to Tackling Inequalities by continuing to consider it a key priority with the
Partnership’s Strategic Plan. 
Through the HSCP strategic plan, the Partnership sets out actions to tackle inequality through its Partnership
Pledge and across its strategic priorities. Tackling inequalities is addressed across HSCP service areas. An
example of actions to help address local inequalities include:
Establishing the Money Matters service in 9 GP practices and 7 local schools in the more deprived areas of
North Ayrshire. This will improve accessibility of the service to those who would benefit most. Building on this
approach through the launch of the Financial Inclusion Partnership bringing a range of key partners and
stakeholders together to improve access and support for the most vulnerable NA residents. 
Increase the number of employability mentors in Justice Services, to support those with experience of the
justice service into meaningful employment or training opportunities and to help divert away from criminal
behaviours.
Working closely with Housing colleagues to support transitions from care and ensuring care experienced young
people can access a positive and stable housing destination. 
In our Drug and Alcohol Services, we are implementing actions to reduce the number of local drug and alcohol
related harms and deaths. This includes implementing the national MAT (Medicated Assisted Treatment)
standards and increasing the number of ABIs (Alcohol Brief Interventions) delivered across North Ayrshire.
Through the Caring for Ayrshire programme, we have set out a phased approach to improve local primary care
premises (GP Practices and Health Centres). This will improve overall professional capacity within GP
practices for Multi-Disciplinary Teams, ensuring the right support is available for local people with health
concerns. 
5 4
Investment in early intervention teams and approaches in Children’s Services to support vulnerable families,
including in Child Protection and Whole Family Support.
The Council considers reducing inequalities to be at the heart of its work.
The Communities & Housing Directorate leads the Community Planning Partnership for the Council, and the
CPP’s Local Outcomes Improvement Plan has a central purpose of reducing inequalities. Locality Planning
priorities and Community Investment Fund funded initiatives are also focused on a range of inequalities,
including poverty, age-related inequalities and digital inequalities. Recent CIF-funded projects have focused on
employability, addictions and community food.
Sam Anson, Executive Director (Education) and David Hammond, Executive Director (Communities & Housing)
led the work of the Child Poverty and Cost of Living Board, chaired by the Council Leader. The five strategic
themes of the Board were:
• No Wrong Door – access to services
• Employability
• Food
• Islands
• Childcare
This work has now been mainstreamed by the Community Planning Partnership (CPP) to ensure greater
partner visibility and impact.
106

Page 107

Work to address child poverty and the Cost-of-Living crisis includes a range of employability initiatives to
support parents and people with disabilities, each of whom are Scottish Government priority groups. Progress
has been made with partners to undertake a review of the Child Poverty & Cost of Living approach, with
recommendations being finalised for consideration by the Board. This is supported by the data and Single
Shared Assessment projects being developed by the Transformation team, to provide holistic support for
residents who need it most. 
The Child Poverty Early Intervention Fund is being used to address gaps in current planning and provision.
Previous funding decisions were made as a consequence of the mini-enquiries to support employability and
travel, childcare developments and support for care experienced young people and families. Further
allocations are currently being developed. 
Through the Scottish Government’s Fairer Futures Partnership we have established a Child Poverty Strategy
Team, who came into post in January 2025. This team will have key oversight role in collectively delivering
holistic support, alongside the transition to a wellbeing economy, in reducing child poverty rates in North
Ayrshire. 
We have started work as one of three areas involved in the Collaboration for Health Equity in Scotland (CHES)
programme. The aims of CHES are to answer two fundamental questions: 1) What are the most impactful
areas for intervention in Scotland to make meaningful progress in closing inequities in healthy life expectancy,
and 2) how can national and local organisations work more effectively to close the gap between policy intent
and impact in these areas? 
The Scottish Government has provided a second year of funding to address inequalities on the islands. This
has been used to fund energy support, welfare advice and support, third sector interventions and school
activities. 
The commitment to reducing inequalities is also reflected in the following plans:
• The Educational Service Improvement Plan
• Connected Communities strategic plans and
• Facilities Management plans. 
Examples of actions to reduce inequalities:
• Deployment of Scottish Attainment Challenge funding to reduce the poverty related attainment gap in
schools
• Use of the Pupil Equity Fund to ensure equity of pupil experience in schools, at the discretion of head
teachers
• Cost of the School Day actions to reduce, for example, the cost of school uniforms and clothing, food
and outings
• Support for care experienced young people, both in schools and through youth services
• Additional national and local investment in Active Schools to focus on inequalities and equity
• The Fairer Food Network, with 14 community larders which support the needs of individual communities
• A network of warm spaces and events to mitigate energy use and social isolation
• Work to support “New Scots,” in schools, with families and in community settings through language
support and capacity building, including women’s groups
• LGBT support groups for young people and those over 18
• Mentoring support for young people in secondary schools through a partnership with MCR Pathways
107

Page 108

Work is in hand with the Third Sector Chief Officers Group to co-design expenditure proposals from the Child
Poverty & Early Intervention Fund on three priorities relating to child poverty, namely childcare, support in
employability and financial inclusion. A sub-group has been established and initial proposals scoped in relation
to the first two priorities, with the group due to meet again prior to the end of March 2025 to finalise proposals
and expenditure commitments. 
In addition to the above, the HSCP re-affirmed its commitment to tackling Inequalities by continuing to consider
it a key priority with the Partnership’s Strategic Plan.
Through the HSCP strategic plan, the Partnership sets out actions to tackle inequality through its Partnership
Pledge and across its strategic priorities. Tackling inequalities is addressed across HSCP service areas. An
example of actions to help address local inequalities include: 
Establishing the Money Matters service in 9 GP practices and 7 local schools in the more deprived areas of
North Ayrshire. This will improve accessibility of the service to those who would benefit most. Building on this
approach through the launch of the Financial Inclusion Partnership bringing a range of key partners and
stakeholders together to improve access and support for the most vulnerable NA residents. 
Increase the number of employability mentors in Justice Services, to support those with experience of the
justice service into meaningful employment or training opportunities and to help divert away from criminal
behaviours. 
Working closely with Housing colleagues to support transitions from care and ensuring care experienced
young people can access a positive and stable housing destination. 
In our Drug and Alcohol Services, we are implementing actions to reduce the number of local drug and alcohol
related harms and deaths. This includes implementing the national MAT (Medicated Assisted Treatment)
standards and increasing the number of ABIs (Alcohol Brief Interventions) delivered across North Ayrshire.
Through the Caring for Ayrshire programme, we have set out a phased approach to improve local primary care
premises (GP Practices and Health Centres). This will improve overall professional capacity within GP
practices for Multi-Disciplinary Teams, ensuring the right support is available for local people with health
concerns. 
Investment in early intervention teams and approaches in Children’s Services to support vulnerable families,
including in Child Protection and Whole Family Support. 
Participation strategies for children and young people and adults to ensure our strategies and investment are
informed by as wide a range of views as possible.   
Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 20
108

Page 109

Strategic Risk Action Plan Date Updated 20-Feb-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG 
Global and national conditions which affect the cost-of-living and poverty continue
to undermine the effectiveness of local control measures. Substantial work
continues to mitigate inequalities but child poverty data, for example, continues to
show an increase. National data collection methodologies have changed which
explains the change in part, but North Ayrshire continues to have c. 29% of
children living in poverty. 
Although unemployment has reduced, it continues to be a driver of poverty, with
in-work poverty a key factor.
Access to benefits is a key driver of poverty and the range of strategies described
above continues to ensure we are maximising access to entitlements. The Single
Shared Assessment work will improve this.
19 September 2024:
The wide range of strategies and initiatives described above,
being further developed and implemented, is anticipated to make
a significant contribution to a range of inequalities. The review of
the CPCOL Board, Child Poverty & Early Intervention Fund,
Fairer Futures funding, and single shared assessment project are
designed to help ‘shift’ the dial in tackling inequalities. 
Actions are being progressed and remain within the target dates
for completion. 
20 Feb 2025:
The work of the CPCOL board has been mainstreamed as a
workstream of the CPP board following discussion with both
groups and in recognition of the importance of the work as a core
function of the partnership. This improves visibility and
governance. 
Work is being developed around the codesigned use of an
allocation of the Child Poverty and Early Intervention Fund along
with the Third Sector Chief Officers Group. This will improve
capacity for change across third sector initiatives delivering on
child poverty outcomes. 
The recent review of Locality Partnerships has resulted in a series
of recommendations designed to refocus the work of the
partnerships on their prime driver of reducing inequality. 
31-Mar-2025  Caroline Cameron 
109

Page 110

Risk Code SRR2526_R03 Risk Title Financial Sustainability of the Health and Social Care Partnership Latest Note Date 16-Jan-2025
Risk Owner Caroline Cameron
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Resources have not kept pace with the demand for and
cost of social care services. The budget settlement for
2024-25 is extremely challenging with a gap of over
£10m across the IJB. Financial modelling suggests
significant ongoing challenges across the medium-term.
There is no certainty around future funding against
growing demand, increasing costs and demographic
pressures, with one-year budget settlements remaining
in place.
The ongoing work to review the Integration Scheme and
to develop new risk-sharing arrangements between the
Council and Health Board in relation to the acute set
aside and primary care prescribing present a financial
risk to the Partnership and Council. 
The Partnership is projecting an overspend of £5.0m in
2024/25, reduced from the £6.5m forecast in August
2024 due to the implementation of a financial recovery
plan. 
The financial position moving into 2025/26 remains
challenging for the IJB.
Funding levels could result in
savings being made that are not
in alignment with the strategic
plan. This could impact on the
future demand levels e.g.
reduction in early intervention
and prevention means that
future demand is increased.
An in-year overspend position
impacts on financial reserves
and ultimately poses a financial
risk to the Council and NHS
Board as funding bodies. The
IJB have formally written to NAC
and the NHS to advise of the
estimated financial support
required. 
Funding levels increase the
requirement to transform
services at scale and pace.
The IJB actively monitors the financial position with regular detailed
reporting. Directors of Finance of the Council and Health Board have
oversight and regular updates are provided to the Council's Cabinet.
There is an integrated approach to managing the totality of NHS and
Council resources delegated to the IJB. A three-year Medium-term
Financial Outlook is updated on a rolling basis each year.
Previous financial settlements have seen both partners meet the
Scottish Government settlement conditions with any additional
resources passed to the IJB. 
The Partnership has developed a new 3-year Transformation Plan
2024-2027 which will be approved by the IJB in March 2024. There is
£2.2m of earmarked reserves set aside to support service change
and re-design. This is fully committed and any slippage has been
drawn down in-year to support the financial position. 
5 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
Increase from 20 to 25  Treat
Increasing risk 25
110

Page 111

Strategic Risk Action Plan Date Updated 16-Jan-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current Status:
RAG 
Budget Monitoring - Regular budget monitoring reports to IJB are effective. 
18 September 2024:
Strengthen support from Finance Team to front line services and
increased engagement with Heads of Service and Senior
Management Teams, including line by line reviews of all budget
areas. Review and enhancement of frequency and level of
financial information provided to support oversight and decision
making in line with financial constraints, with an added focus on
areas of underspend to maximise opportunities to delay or stop
spend and contribute to the overall financial challenge. 
16 January 2025:
The capacity of the NHS finance team to provide up to date
monitoring information has been raised and discussions are
ongoing to ensure accurately and timely information is provided to
the IJB. 
31-Mar-2025  Caroline
Cameron 
Corrective Action – Transformation Board is effective 
18 September 2024:
A three-year Transformation Plan covering the period 2024-2027
was approved by the IJB in March 2024. This focusses on
addressing the future financial challenge in a sustainable way, as
well as reviewing service delivery models and implementing local
and national priorities. 
16 January 2025:
The transformation board has a themes-based agenda e.g.
children & families, community care & health etc. This has
allowed a stronger focus on each area. Regular updates have
been presented to the IJB on progress. 
31-Mar-2025  Caroline
Cameron 
Enhanced Financial Controls
18 September 2024:
Establishment of a Budget Working Group to facilitate increased
oversight and scrutiny of the financial position and transformation
programme as well as detailed budget planning for future financial
years. The first meeting took place on 9th September.
Review of expenditure authorisation levels across the Partnership
and escalate specific decisions to senior officers.
Staff communication in relation to discretionary/non-essential
spend. 
Review of temporary posts and robust vacancy
management/approval – only essential frontline posts will be
approved for recruitment.
Strengthen across services the existing approval and prioritisation
approaches for new care requests, which will be approved in line
with resource availability. A new group has been established to
sign off all higher value care packages (Over £40k). 
6th March 2025: 
The Finance Working Group has now met 6 times and covered a 
31-Mar-2025 
Caroline
Cameron 
111

Page 112

range of areas to support increased oversight and scrutiny of the
financial position and transformation programme and to support
detailed budget planning for future years. This has supported
proposals for the 2025/26 budget coming forward before March
2025 for approval and an improved understanding of the scale of
the financial challenge and the difficult decisions required to
manage this.
The Financial Recovery Plan is estimated to deliver £4m of
benefit in-year, with the forecast outturn reported to be £5m, a
reduction from the £6.5m reported in August 2024. Some of the
benefit of the plan has been eroded by unexpected financial
pressures in-year.   
National Influence/Escalation
6th March 2025: 
Through the NA Chief Officer the IJB have raised concerns
nationally with Scottish Government, with Civil Servants and
Politically re the impact of the financial position aligned to
performance, for example the priority of the Delayed Discharge
Mission. Scottish Government plans to publish an NHS Renewal
plan at the end of March 2025 which will describe how the £200m
funding set out as part of the budget will be deployed to improve
performance. As part of this, and through NHS Boards, HSCPs
were requested to submit costed improvement plans. North
Ayrshire HSCP submitted a request for £9.5m of additional
funding of which the majority of funding is for social care, the
HSCP await feedback following submission by all Boards to
Scottish Government. 
Concerns have also been raised nationally by Audit Scotland
through their Finance Bulletin on IJBs published on 6th March and
by Chief Officers as a collective, Chief Officers shared the national
scale of financial challenge with Scottish Government officials and
politicians on 5th March with a request that IJB requests for
funding are prioritised.   
112

Page 113

Risk Code SRR2526_R04 Risk Title Cyber Security Latest Note Date 15-Jan-2025
Risk Owner Fiona Walker
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
The potential compromise of business operations or a
data breach orchestrated via either digital channels or
the IT infrastructure. This can include targeting of the
user base. Risk derives from both Council operations
and those of its supply chain.
The increasing importance of delivering services
through digital channels and maximising efficiency
through effective and secure use of technology. This
includes a growing adoption of cloud-based computing
resources which extend processing capabilities, and
associated risks, beyond the Council’s network. 
Hybrid remote and mobile working is now the normal
working practice for over 3,000 staff. Such a distributed
work force increases the complexity of protecting
against cyber and data protection risks.
Failure by Services to adopt and comply with
strategies, policies and procedures may
result in a failure to adequately ensure the
desired levels of cyber-security required to
maintain and protect council systems and
data.
There may be a significant impact on the
authority through the release of personal
and/or sensitive information resulting in a loss
of public confidence and significant financial
loss incurred through fines and service
disruption. 
A successful cyber-attack (malicious external
or internal action) on the Council’s IT
environments could also result in significant
service disruption, loss of income streams
and possible data loss/exposure.
Impacts of a cyber-attack could include
economic (i.e. inability to collect online
payments), societal disruption (i.e. loss of
diaries and client appointments), and
reputational damage (i.e. loss of public
confidence in digital services).
It is recognised that it is not possible for any
organisation to expect to be completely protected
against continually evolving cyber threats. A threat
actor with sufficient motivation, resource and capability
will be able to compromise the most secure system.
The Council takes a sociotechnical approach to
reducing risk by continually developing protective
measures through technical, organisational and
people-focused controls. 
Technical controls are implemented in areas such as
network defences, secure configuration of systems,
user authentication, malware protection, and
vulnerability management. These are based on best
practice and independently tested on an annual basis
to confirm their effectiveness in accordance with
compliance schemes. 
The Council employ a fully managed Security
Operations Centre (SOC) service which provides
advanced monitoring, detection and response
capabilities on a 24 hours a day, 365 days a year
basis. 
The Council maintains a comprehensive set of policies,
standards, guidelines, metrics and reporting
mechanisms as part of its information security
governance structure. A comprehensive training and
awareness programme is delivered to nurture a cyber-
aware workforce and culture. 
4 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Stable 16
113

Page 114

Strategic Risk Action Plan Date Updated 15-Jan-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Incident Detection and Response – Recent cyber-attacks on public
sector organisations highlight the need for robust incident detection
and response procedures and technologies. The current response
procedures been shown to be effective based on incidents
experienced so far, however detection capabilities will need to be
reviewed and improved.
.
13 September 2024: 
Progress on the Digital Office joint procurement exercise has remained extremely
slow, as a result the Council have opted to procure a SOC/MDR service
independently. The procurement exercise is now progressing. 
15 January 2025: 
Following a process of market consultation and vendor engagement, the Council have
recently procured a Managed Security Operations Centre (SOC) service for an initial
period of three years. The project is currently in the implementation phase and we
anticipate the service being fully operational by the end of February 2025. 
31-Mar-2025  Fiona Walker 
Training and Awareness 
13 September 2024:
Cyber Security training continues to be delivered; however this is now a Teams
delivered course to maximise the attendance numbers. The Cyber Security
Essentials E-Learning course continues to be available for 2024 and is undergoing
a full re-write for 2025 to ensure this remains current. This training is being
supplemented with a programme of awareness raising initiatives including
educational staff news items and webinars.
Phishing simulations have continued in order to assess the effectiveness of
existing training and further increase awareness.
15 January 2025:
The mandatory Cyber Security Essentials E-Learning course remains our training
initiative with the greatest reach. This course has been fully re-written and is now
live for all employees to complete annually.
The mandatory E-Learning course is being supplemented by a range of further
initiatives to include all-staff webinars, awareness raising news posts and other
communications, this approach aims to ensure messaging is kept current and
reflects the rapidly evolving threat landscape.
Phishing simulations continue to be used to validate effectiveness of training and
awareness initiatives. 
Ongoing  Fiona Walker 
114

Page 115

Risk Code SRR2526_R05 Risk Title Transformation Latest Note Date 25-Feb-2025
Risk Owner Mark Boyd
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact 
There is a risk that transformation and change
activities, which are core to the future delivery
models and long-term financial sustainability of
both the Council and Health and Social Care
Partnership, fail to deliver at the level of scale
and pace required.
Failure to deliver transformational change
will impact on the Council’s financial
sustainability, effectiveness of service
delivery and delivery of the outcomes set
out in the Council Plan 2023-28 and the
Local Outcome Improvement Plan
(LOIP).
Failure to deliver the HSCP
Transformation programmes across the
Partnership, involving North Ayrshire
Council (NAC) and NHS Ayrshire & Arran
(NHSAA) services may lead to the
identified outcomes not being delivered;
resulting in financial instability, reduced
performance, deteriorating patient
outcomes, and reputational damage
within North Ayrshire Health and Social
Care Partnership (NAHSCP). 
Failure to embed cultural transformation
activities may lead to difficulties in
building future workforce capacity and in
ensuring we have an engaged, skilled
and knowledgeable workforce to meet
service demand.
The transformation programme aligns to the Council Plan and is
monitored via the Transformation Board. The Board is chaired by
the Chief Executive. 
Workstreams have been developed across Transport and Travel,
Digital, Land and Property assets, Sustainability, Financial Inclusion
as well as ongoing reviews across Waste Services, ELC, Learning
Resources and Housing.
HSCP have an established Transformation Board to closely monitor
progress with plans, regular updates on programme to the IJB and
regular meetings with the Chief Executive and S95 Officer to review
progress and mitigation plans. Cultural transformation activities
continue to evolve to support the Council’s transformation and
improve effectiveness and capability. This includes sharing learning
and skills, engagement, design experiments and a whole systems
approach to transformation and change. 
Our workforce planning approach utilises a variety of tools and
techniques, such as career development, succession planning,
vacancy management, redeployment and early release schemes to
ensure our workforce requirements for the future, in terms of skills
and capabilities, are planned. Each Head of Service has a workforce
plan, and these are monitored six-monthly with continued HR
support and guidance to ensure service review and redesign of the
workforce is on track. 
3 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 12
115

Page 116

Strategic Risk Action Plan Date Updated 25-Feb-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Existing project level governance and controls remain effective and are
constantly reviewed. 
11 September 2024:
Programme continues to be developed and work being progressed
to feed a pipeline of financial efficiencies into the Budget programme
for 2025/26. 
25 February 2025:
Scoping has commenced to inform the next stages of a further
property transformation workstream, focusing maximising the
benefits that can be derived from the property estate (ie, capital
receipts, community wealth building, net-zero, etc). 
Quarterly 
Mark Boyd / Chief
Executive and
Executive Directors 
Review current governance arrangements and project delivery in view of
land and property workstream to seek optimal delivery aligned to the
council’s net zero ambitions. 
11 September 2024:
Governance arrangements in place and property programme being
progressed. This will feed into the 2025/26 Budget programme. 
25 February 2025:
Regional Land and Assets workstream being further developed with
NAC as lead organisation. 
Work to deliver the Irvine Locality Workstream, approved by Cabinet
in March 2024, is well progressed with the majority of staff now
occupying Cunninghame House. 
26-Feb-2025 
Mark Boyd / Chief
Executive and
Executive Directors 
116

Page 117

Risk Code SRR2526_R06 Risk Title Climate Change Latest Note Date 24-Feb-2025
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Climate change is expected to continue and
worsen in the future if no action is taken,
with increases to mean global temperatures,
sea level rises and the increasing frequency
and severity of weather events such as
floods, heatwaves, droughts and storms.
More frequent and intense heavy rainfall
events increase the risk of soil erosion and
flooding.
Rises in mean sea level increases risks of
coastal erosion, flooding, saltwater intrusion
and soil salinisation (risk to agricultural land
and freshwater habitats). 
Severe weather is already affecting public
services across Scotland, with operational,
reputational, financial and legal
consequences.
There is also an ongoing impact of severe
winter weather including snowfall and
freezing temperatures which impact service
delivery and the integrity of our roads open
space and buildings infrastructure. This shift
in weather patterns caused by climate
change is also affecting biodiversity across
Scotland.
Increased frequency of severe weather
conditions and flooding events may lead to
more instances of damage to Council
infrastructure and property, interruptions to
service delivery and increased demands
on services, often with little notice.
Risk to life, transport disruption and
pollution to the local environment, as well
as impact adversely on the local economy
if businesses are unable to operate. 
Council requirement to provide immediate
response and manage the adverse effects
of more frequent and severe weather
emergency situations, including support to
local communities and businesses. 
The Council is required to comply with the
‘Public Bodies Climate Change Duties’
under the Climate Change (Scotland) Act
2009. These duties require the Council to
assess the risks, threats and opportunities
associated with climate change and
identify actions to increase resilience to
climate change.
North Ayrshire Council declared a Climate Emergency in June 2019, committing
to act on climate change and reduce carbon emissions. In January 2020 the
Council approved the target to become net-zero carbon by 2030, for both Council
estate emissions and area-wide emissions.
Following implementation of the Council’s third Environmental Sustainability and
Climate Change Strategy (2021-23), Cabinet approved the new Sustainable North
Ayrshire Strategy (2024-27) in December 2023. This strategy provides a road
map to achieve the net zero carbon emissions by 2030 target. 
There are 5 workstreams within the Sustainable North Ayrshire strategy, namely
Energy, Nature, Transport, Waste and Adaptation. We continue to utilise
Adaptation Scotland’s Capability Framework to ensure North Ayrshire takes a
strong, proactive approach to adapting to climate change. Officers are
participating in the Sustainable Scotland Network’s ‘Adaptation Scotland
Benchmarking Group’ to learn and share best practice with other local authorities. 
Adaptation actions are identified within the Ayrshire Flood Risk Management Plan
(2021), the Ayrshire Local Flood Risk Management Plan (2022), the Ayrshire
Shoreline Management Plan and in the Adaptation Capability Framework.
Flood studies are undertaken to help the Council identify areas that are at risk of
flooding and to appraise options to reduce flood risk to communities and
infrastructure.
In addition, actions to mitigate Climate Change risk are held within strategies such
as the Local Transport and Active Travel Strategy, Local Biodiversity Action Plan,
Vacant and Derelict Land Strategy and Weather and Winter Emergencies Plan.
Asset management plans are in place which are regularly reviewed for our
Roads, Fleet, Housing, Property and Open Spaces.
Furthermore, through the Ayrshire Civil Contingencies Team there are emergency
planning arrangements in place in the event of severe weather and flooding
conditions causing major disruption and damage to the area or to individual
communities within it. 
4 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Stable 16
117

Page 118

Strategic Risk Action Plan Date Updated 24-Feb-2025 
Analysis of Effectiveness of Controls  Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG 
Reducing Carbon Emissions:
North Ayrshire Council declared a Climate Emergency in June
2019, committing to act on climate change and reduce carbon
emissions. In January 2020 the Council approved the target to
become net-zero carbon by 2030, for both Council estate
emissions and area-wide emissions. 
The Council has taken action against climate change since our
first Carbon Management Plan in 2006/07, by working to reduce
emissions associated with Council services, and using the
baseline year of 2005/06 from which to measure progress. 
Since the baseline year of 2005/06, Council estate emissions
have reduced by 67%, from 63,334 tonnes of carbon dioxide
equivalent (tCO2e) to 20,745 tCO2e. Area-wide emissions are
published by BEIS. Current records show total emissions have
reduced across North Ayrshire by 42.6%, from 1,454 kilo-tonnes
of carbon dioxide (ktCO2) in 2005 to 835 ktCO2 in 2019. 
To ensure North Ayrshire Council can develop a leading, cross-
sector and community led approach we established a Climate
Change Steering Group (CCSG) in 2021. The CCSG is chaired
by the Cabinet Member for Green Environment and Economy,
and brings together young people, local businesses and
community organisations from across North Ayrshire. 
Existing controls remain effective and are under review as our
response to climate change develops and we progress towards
achieving net zero by the 2030 target. 
20 September 2024:
Actions detailed within the Sustainable North Ayrshire Strategy continue to be implemented,
with progress monitored through the Council’s corporate performance management system
for example:
• Participation in the Scottish Climate Intelligence Service to expand action on and
monitor area-wide emissions.
• Publication of North Ayrshire’s first Local Heat and Energy Efficiency Strategy
(LHEES) and progression of initial actions from Delivery Plan.
• Development of two solar PV farms on former landfill sites.
• Completion of feasibility study for the decarbonisation of built assets.
• Progression of green hydrogen generation study.
• Development of North Ayrshire Nature Network strategy to address statutory.
requirements to tackle the nature crisis.
• Partnership working with Ayrshire Roads Alliance to undertake Electric Vehicle
Infrastructure project.
• Successful realisation of £725,998 external funding for domestic energy efficiency
measures through ECO4 Flex partnership. 
20 September 2024:
Progress continues on delivery of the Sustainable North Ayrshire Strategy, including:
• The two solar farm projects are nearing completion and are due to be energised in
the spring of 2025
• The North Ayrshire Network Strategy has been reviewed by the Policy Advisory Panel
and will be presented to Cabinet in March 2025
• A transformation workstream to address the decarbonisation of the fleet
• Corporate engagement on behaviour change, including undertaking a Leadership
Conference, Chief Officer Leadership Team workshop and Member Workshop.
Undertaking physical energy efficiency measures within the corporate estate (predominantly
lighting upgrades) and developing a forward programme of further interventions 
24 February 2025
Business and Sustainability Fund agreed through 2024/25 budget in delivery including
appointment of Programme Manager and development of Islands Net Zero Accelerator
(NZA) and Phase Two Mainland NZA programmes. Islands NZA Programme supported by
£25k funding from Zero Waste Scotland. 
Wider Place strategy updates continue to be provided through Pentana and governed
through the Place Project Board. 
31-Mar-2027  Russell
McCutcheon 
118

Page 119

Strategic Risk Action Plan Date Updated 24-Feb-2025 
Analysis of Effectiveness of Controls  Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG 
Flood Risk Management Plan:
Cycle 2 of the Ayrshire Local Flood Risk Management Plan has
been developed and was published on 31st December 2022.
Studies and modelling will be undertaken to identify and prioritise
vulnerable areas where financial damage and risk to life are most
likely. 
There is an ongoing programme of monthly inspections of debris
screens which have been installed to prevent vulnerable culverts
from blocking and causing flooding. CCTV inspections of culverts
are also undertaken to identify blockages and deterioration of
assets that might cause flooding. This has been effective in
reducing flooding, although there are capacity issues h that this
process cannot address. 
The Upper Garnock Valley FPS has been completed and is
currently providing flood protection. 
Ayrshire Shoreline Management Plan:
The Ayrshire Shoreline Management Plan will be replaced with a
Coastal Change Adaptation Plan. The adaptation plan will enable
the Council and other stakeholders to effectively plan our future
actions whilst allowing for flexibility in response to future changes.
It will incorporate recent international and UK advances in
adaptation and shoreline management planning to allow for local
interpretation and involvement. 
20 September 2024:
1. The Millport Coastal Flood Protection Scheme is 99% complete and we will commence a
further flood protection scheme at the Mill Burn, also in Millport.
2. The Three Towns flood study is underway. This study will confirm flood risk from the
Stevenston Burn & the Stanley Burn. The impacts of climate change will be evaluated.
Where flood risk is confirmed, scoping of the next steps will be completed and this will
inform the second stage of the study.
3. The North Ayrshire Water Body Clearance & Repair Schedule has been updated to
include details of the planned assessment of various water bodies. Where these
assessments find that the condition of the water bodies would or could contribute to
significant flood risk, then the necessary clearance and repair work will be scheduled and
completed.
4. Storm Gerrit brought widespread flooding to North Ayrshire on the 27 December 2023.
Emergency repairs to culverts in Millport and Kilbirnie have now been completed.
5. In April 2024, a blockage in the Minister’s Cast culvert increased flood risk to roads and
properties in Irvine including The Circuit leisure facility and Woodlands Primary School. The
clearance and repair framework was used to commission emergency works that restored the
performance of the culvert.
6. A draft coastal management study at Irvine & Stevenson is complete and was subject to
public consultation in September 2024. When finalised, the study will help to inform a local
Coastal Change Adaptation Plan. This plan will set out triggers for when the coastal erosion
and flood risk adaptations identified in the management study should be implemented. 
24 February 2025:
1. The construction of the Millport Coastal Flood Protection Scheme is complete. The
scheme performed well during Storm Éowyn and no significant reports of coastal flooding
in Millport were received. A pre-tender notification for the Millport Mill Burn Flood
Protection Scheme was issued in January 2025. It is anticipated that the contract will be
awarded in Autumn 2025, that construction will commence in late 2025, and that
completion will be in 2026.
2. The first stage of the Three Towns Flood Study was completed in February 2025 and the
scope has been agreed for the second stage. 
3. The scheduled clearance and repair work continues to be implemented to help reduce
flood impacts to people and property. 
4. Following completion of the coastal management studies for Stevenston & Irvine,
progress is being made to develop local Coastal Change adaptation plans for the study
areas. A site investigation is planned to confirm the presence of contaminated spoil and
how exposed this material could be to future coastal erosion. 
5. Following completion of the Upper Garnock Flood Protection Scheme and an update of 
30-Jun-2028  Thomas Reaney 
119

Page 120

Strategic Risk Action Plan Date Updated 24-Feb-2025 
Analysis of Effectiveness of Controls  Further Action Required
Target Date
for
Completion
Officers
Responsible
Current
Status: RAG 
the Lower River Irvine hydraulic model, a consultant has been appointed to update the
relevant parts of the Council’s flood resilience plan, including measures at Cunninghame
House and Marress House.   
120

Page 121

Risk Code SRR2526_R07 Risk Title Community Capacity Building and Empowerment Latest Note Date 3-Feb-2025
Risk Owner Rhonda Leith
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact
Unrealistic timescales for progressing of aspects of
legislation of the Community Empowerment Act
(Scotland) 2015, such as Community Asset
Transfer.
Pressure to support community capacity building
and the variation of needs within a reducing
workforce. 
Duplication of effort across HSCP and Locality
Partnerships to foster community participation and
deliver engagement activities. 
Complying with the complex and resource
intensive consultation legislation in service
redesign. 
Rising energy and utility costs relating to property
management.
Budget savings and pressure on property
maintenance budgets.
Where the risk is not managed effectively the
potential benefits of community capacity building
and empowerment may be lost. 
Widening inequality gap between those
communities where levels of capacity and
engagement with the empowerment agenda are
high and those with less social capital where
interest remains low, which constrains the ability
to influence the planning and delivery service.
Any disconnect between the Council’s
aspirations, community appetite for increasing
ownership of assets and what communities
themselves feel able and prepared to commit to
can result in community assets reverting back to
Council. 
Accelerating asset transfer risks losing services
and facilities and risks the ability to plan, connect
and deliver strategic services.
Over-engagement carries disengagement and
engagement fatigue.
Increased property costs can be a deterrent for
organisations engaging and completing the CAT
process. 
Lack of budget to undertake proactive
maintenance is resulting in NAC buildings falling
into disrepair detracting organisations from
progressing to lease and or ownership of NAC
assets.
Ongoing commitment to community empowerment and
locality partnerships from CPP. 
Six locality partnerships and alignment with HSCP
locality arrangements.
Leadership of the CPP Senior Officers’ Group. 
Enabling approach with community partners and support
with third sector interface to build capacity and identify
opportunities for growth and sustainability. 
Reviewed guidance and processes relating to
community empowerment functions.
Participatory budgeting approach local grants,
commitment to PB with partners and leading practice in
mainstreaming participatory approaches. 
External funding bid help for groups through regular
meetings with third sector, funders and funding officer.
Membership of The Consultation Institute.
Investment from Community Asset Transfer Start Up
Fund, prioritising additional staffing capacity to support
CAT in TACT. 
A collaboration and shared resource approach across
Connected Communities Teams will be taken to ensure
the Service deliver on this priority. 
Careful monitoring of staffing capacity to ensure
legislation is met. Standing item at Senior Manager
Meetings to assess impact
Progress discussions with key stakeholders re
dependencies on the progress and impact of delays. 
5 4 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No change  Treat
Increasing 20
121

Page 122

Strategic Risk Action Plan  20-Feb-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
Implementation of Community Empowerment Act:
Existing controls remain effective and are kept under review. 
19 September 2024:
New Strategic CLD Plan 2024 – 2027 in final stages of development and continues to
identify priorities and support available. 
31-Mar-2025  Rhonda Leith 
19 September 2024:
Linking with National partners i.e. Scottish Government to ensure timely communication to
any changes relating to national legislation and allow preparations to be in place. 
31-Dec-2024  Rhonda Leith 
Staff capacity:
Existing controls remain effective however forthcoming VER
structure changes will result in a reduction of CLD professional
staff and risks further pressures on staff to deliver effectively to
key outcomes. 
19 September 2024:
Function review within the CLD team underway to assess capacities and impact following
the service redesign. Focus will be on assigning resource to key priorities. 
20 February 2025:
Ongoing discussions being held with key stakeholders re capacity across Council services
and impact on timescales. 
31-Dec-2024  Rhonda Leith 
Duplication of effort:
Clearly defined roles and lean processes are reviewed and
maintained to avoid duplication of effort and minimise time and
resource wastage. The team foster open communication
channels with both staff and key stakeholders. 
19 September 2024:
The aim is to capture and address issues through the review of functions underway within
the CLD team. 
31-Dec-2024  Rhonda Leith 
Consultation:
Existing controls remain effective. Existing controls remain
effective and hybrid engagement models have been
implemented post covid to encourage and provide greater
access to participation. 
19 September 2024:
Cross Service support for consultation and engagement is being further developed with the
promotion of existing tools and supports across all Council services to encourage
ownership over service engagement. 
20 February 2025:
An extensive programme of budget engagement took place between 10 October and 25
November 2024 including surveys across six main themes as well as in person and online
focus groups. The approach was designed to support our residents to contribute their
views, make the surveys more accessible and avoid digital exclusion. This has resulted in
4,461 responses and almost 40 community conversations across the six budget themes,
more detailed feedback on proposals and considerable engagement with community
groups across North Ayrshire. The engagement has also enabled our residents to bring
petitions on specific options to the Audit and Scrutiny Committee and Cabinet,
demonstrating a high level of engagement with democracy within our communities 
31-Mar-2025  Rhonda Leith 
122

Page 123

Increased property costs and lack of investment in community
assets. 
19 September 2024:
Matter escalated through a range of mechanisms including Health & Safety, PMI/Risk
meetings and reporting systems as well as more frequent management on-site building
visits to assess building condition and escalate accordingly. 
A strategic plan is in the early stages of development to address identified condition issues
in buildings earmarked for potential Community Asset Transfer (CAT). Specific investment
funds have been allocated to support this initiative. 
20 February 2025:
Strategic plan for use of CAT investment funds in place. ELT oversight continues of plan
and spend. Horizon scanning for other potential investment opportunities carried out on an
ongoing basis. 
31-Mar 2025  Rhonda Leith 
123

Page 124

Risk Code SRR2526_R08 Risk Title Property Asset Risk Latest Note Date 25-Feb-2025
Risk Owner Russell McCutcheon
Risk Proximity Factors Consequences / Impact Existing Risk Control Measures Likelihood Impact 
The long-term impact of restricted budget
availability for investment in the Council’s property
assets means these assets are in declining
condition and have greater long term investment
needs.
Systemic building safety issues have been
evidenced by issues such as national high profile
safety issues, and the presence of RAAC through
the public sector property portfolio. These have
highlighted the substantial increasing burden of
property asset management. 
There have been a number of near misses or
critical failures of aging heating plant and
equipment which the council cannot afford to
replace on a programmed basis. 
Inflationary pressures, and on-going volatility in the
construction & related activities sphere, place
further difficulties in the ability of restricted budgets
to address all priorities. 
Maintenance issues and failure of building
components are increasingly likely to result in
disruption to service delivery. There is also an
increasing risk of health and safety and statutory
compliance obligations not being achieved. 
Property events requiring significant interventions
leading to service disruption, closure of facilities,
decant etc. are in increasing in frequency and
often over-lapping (often coinciding with weather
events).
Property condition information is gathered and recorded
within the Council’s electronic asset management
system, providing a baseline to measure building
element lifecycle replacement requirements across the
corporate estate.
The limited investment available is therefore targeted on
priorities. 
Reactive maintenance, and statutory compliance are
also undertaken corporately by PMI, by appropriately
trained / experienced staff. 
There is an on-going Transformation programme
workstream focusing on property rationalisation as a
means of reducing the financial burden of the estate
through reducing overall area occupied (aligned to
carbon reductions). 
Post Incident reviews and lessons learned exercises
with actions undertaken where feasible to do so. 
Risk based property reviews are underway to examine,
on a property by property basis, where property risks
have the potential to impact service delivery. The
information gathered influences both investment plans
and business continuity plans. This work is on-going in
respect of the school estate and is being rolled-out to
other services’ assets. 
An additional £0.5m has been allocated in the 25/26
budget to the Property Lifecycle Budget to address
condition issues within the corporate estate. 
In addition, £0.5m has been allocated to undertake
energy efficiency measures in the property estate and a
joint Sustainability / PMI working group has been
established to identify and progress relevant investment.
This will be coordinated to ensure optimal benefit for
both energy efficiency and property condition. 
Business Continuity Planning, taking cognisance of the
risks posed by potential building unavailability is also
being strengthened. 
4 5 
Status  Risk Score 
Heat Map 
Change in Score Approach 
No Change  Treat
Stable 20
124

Page 125

Strategic Risk Action Plan Date Updated 25-Feb-2025
Analysis of Effectiveness of Controls Further Action Required Target Date for
Completion
Officers
Responsible
Current
Status: RAG 
CC&M team within PMI managing reactive maintenance and
statutory compliance.
Team resources stretched; however, restricted budgets are principal risk.
13 September 2024:
Team resources remain stretched, presently exacerbated by recent staff departure,
recruitment exercise currently on-going. 
21 February 2025:
Although previous vacancies were successfully filled, further staff departure now requires
recruitment process – continuing to stretch resources. 
Ongoing  Russell
McCutcheon 
Asset management team within PMI collecting asset condition
information and leading prioritisation of lifecycle investment.
Improved asset management system is being investigated; however, restricted budgets
are principal risk. 
13 September 2024:
Work continues in relation to the new asset management system, including bench-marking
and information sharing with other authorities. 
Ongoing  Russell
McCutcheon 
Property rationalisation programme
Locality based property review work currently underway to increase scale and pace of
implementation.
13 September 2024:
The Irvine Property Accommodation programme received Cabinet approval in March 24
and is progressing to programme. 
21 February 2025:
The programme of accommodation moves flowing from the Irvine Property Review is well
advanced and scoping has commenced for further review of the Council’s estate across all
localities. 
Ongoing  Russell
McCutcheon 
Risk based property review process
Requires up to date property information, including client information and cross service
buy-in to be effective. 
13 September 2024:
The Education Estate has been reviewed in its entirety and quarterly meetings have been
established to continue this work on a priority-basis.
The approach has also been utilised in respect of the communities estate.
21 February 2025
In addition to the estate review meetings noted above, Business Continuity Planning,
taking cognisance of the risks posed by potential building unavailability is also being
strengthened. 
Ongoing  Russell
McCutcheon 
125

Page 126

126

Page 127

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee
Title: Internal Audit Annual Report 2024/25
Purpose: To provide the Committee with an annual report on the work of
Internal Audit during 2024/25 and provide an opinion on the
governance, risk management and internal control environment
of the Council.
Recommendation: The Committee is asked to note the content of the annual report
and the opinion of the Senior Manager on the Council’s
governance, risk management and internal control environment. 
1. Executive Summary 
1.1 The purpose of this report is to present the annual report on the internal audit activity
during 2024/25, and to provide an independent opinion on the adequacy and
effectiveness of the Council’s governance, risk management and internal control
systems for the year ended 31 March 2025. 
2. Background 
2.1 The Public Sector Internal Audit Standards (PSIAS) require that the Chief Internal
Auditor prepares an annual report on the activities of Internal Audit and that the report
should contain a view on the adequacy of the Council’s governance, risk management
and internal control frameworks. The annual report for 2024/25 is attached at
Appendix 1 and outlines the role of Internal Audit, the performance of the section
during the year and the key audit findings. It also contains the annual internal audit
opinion. 
2.2 The required annual report for financial year 2024/25, together with the statement on
internal controls, is included in Appendix 1. 
2.3 The internal audit plan for 2024/25 (approved by the Audit and Scrutiny
Committee in March 2024 and updated in October 2024) has been substantially
completed. Audit fieldwork remains in progress on seven assignments. Two audit
assignments are at draft report stage, meaning the assurance opinion can be
included in the overall annual audit opinion. 
2.4 All audit findings during the year support and inform the objective opinion of the Senior
Manager (Audit, Fraud, Safety, Risk & Insurance) on the adequacy of the Council’s
Agenda Item 10
127

Page 128

governance, risk management and internal control environment. The assurance
category given to each individual audit informs the overall level of assurance.
2.5 The annual internal audit opinion also contributes to the Annual Governance
Statement which is published as part of the Council’s annual accounts and is included
under separate cover to this Audit and Scrutiny Committee meeting for approval. 
2.6 Based on the audit work carried out, the opinion of the Senior Manager (Audit, Fraud,
Safety, Risk & Insurance) is that reasonable assurance can be placed on the
adequacy and effectiveness of the Council’s systems of governance, risk
management and internal control. 
3. Proposals 
3.1 It is proposed that the Committee notes the content of the annual report and the
opinion of the Senior Manager on the Council’s governance, risk management and
internal control environment. 
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic
priorities within Our Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
128

Page 129

5. Consultation 
5.1 Council Services are consulted on the findings of Internal Audit throughout the year.
No specific consultations have taken place in relation to this annual report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.
129

Page 130

Appendix 1
INTERNAL AUDIT ANNUAL REPORT 2024/25
1. Introduction
1.1. The purpose of this report is to summarise the Internal Audit activity for 2024/25 and
provide an opinion on the overall adequacy and effectiveness of the Council’s
governance, risk management and internal control frameworks.
1.2. The Council’s Section 95 Officer has overall responsibility for Internal Audit in North
Ayrshire Council. The Senior Manager (Audit, Fraud, Safety, Risk & Insurance)
reports to the Section 95 Officer, with the right of access to the Chief Executive and
the Chair of the Audit and Scrutiny Committee on any audit matter. These rights of
access help ensure the organisational independence of Internal Audit.
1.3. The presence of an effective internal audit function contributes towards, but is not a
substitute for, effective control. It is the responsibility of management to have
adequate controls in place and to ensure these controls are operating effectively. A
sound control system will help safeguard assets, ensure records are reliable, promote
operational efficiency and ensure adherence to the Council’s policies and
procedures. Such systems of internal control can provide only reasonable and not
absolute assurance against loss.
2. Reporting requirements of the Public Sector Internal Audit Standards (PSIAS)
2.1. During 2024/25 Internal Audit operated in accordance with the PSIAS requirements
which are an independent, objective assurance and consulting activity designed to
add value and improve an organisation’s operations. The PSIAS helps an
organisation accomplish its objectives by bringing a systematic, disciplined approach
to evaluate and improve the effectiveness of risk management, control and
governance processes.
2.2. Internal Audit operates within the Internal Audit Charter, most recently approved by
the Audit and Scrutiny Committee in March 2025.
2.3. The PSIAS places a number of reporting obligations on the Chief Internal Auditor in
respect of the annual report. These obligations are summarised below:
PSIAS Ref Requirement Evidence
1110 The chief audit executive must
confirm to the board, at least
annually, the organisational
independence of the internal
audit activity.
The Senior Manager reports
directly to the Audit and Scrutiny
Committee, and unfettered access
is available to the Chief Executive
as required.
1320 The results of the quality and
assurance programme and
progress against any
improvement plans must be
reported in the annual report.
The results of the external quality
assessment, carried out in 2022,
were reported to the Audit and
Scrutiny Committee in September
2022. All actions are complete.
130

Page 131

PSIAS Ref Requirement Evidence
2450 The chief audit executive must
deliver an annual internal audit
opinion and report that can be
used by the organisation to
inform its governance
statement.
This report to Audit and Scrutiny
Committee provides the annual
report and statement of assurance
on internal controls.
2450 The annual internal audit
opinion must conclude on the
overall adequacy and
effectiveness of the
organisation’s framework of
governance, risk management
and control.
This report to Audit and Scrutiny
Committee provides the annual
statement of assurance at Annex
B.
2450 The annual report must also
include a statement on
conformance with the Public
Sector Internal Audit Standards
and the results of the quality
assurance and improvement
programme.
This report to Audit and Scrutiny
Committee provides a statement
on the conformance with the
PSIAS at Section 5 below.
3. Planned and Actual Activity during 2024/25
3.1. The internal audit plan was approved by the Audit and Scrutiny Committee in March
2024 with a mid-year update to the plan approved in October 2024. Productive time is
allocated in the plan to the delivery of audit assignments with a balance of time
retained within the service for non-productive activities which includes management
and strategy, attendance at meetings, administration and staff training and
development.
3.2. The mid-year revised plan included 17 assignments where an audit output was
anticipated with a further 3 unplanned investigations undertaken during the year as a
result of issues arising which required audit input. 10 of these assignments have
been completed, 2 are at draft report stage, 7 are currently work in progress and one
has not yet started.  
3.3. Of the 7 work in progress audits, 3 relate to the HSCP / North Ayrshire Integrated
Joint Board (NAIJB), 2 relate the Corporate Services directorate and one relates to
the Place directorate.  The fieldwork for these audits has commenced and is at
various stages of completion.
3.4. The audit that has not yet commenced relates to Income Management and although
this was intended to be undertaken during 2024/25 it was agreed with service
management, due to year-end priorities, to delay this for a short period of time.  This
will now commence during Q1 of 2025/26.  The assurance levels and associated
actions arising from this and the 7 work in progress assignments are therefore yet to
be confirmed.  The results of these assignments will be reported to a future meeting
of the Audit and Scrutiny Committee.
3.5. In line with the Council’s defalcation procedures, all instances of suspected fraud and
irregularity should be reported to Internal Audit. These are investigated by the
specialist Corporate Fraud Team and are not included within this annual report.
131

Page 132

3.6. All audit reports finalised during 2024/25 were reported to meetings of the Audit and
Scrutiny Committee. A summary of outputs achieved are included in Annex A.
3.7. The outcomes from the audit work during the year have generally been positive,
with mostly substantial and reasonable assurance opinions. Five audit reports have
been finalised during the year where elements of the scope have resulted in a
limited assurance opinion. These are as follows:
• Education Leavers and Movers – This audit reviewed the arrangements for
managing staff who move post internally or leave the Council completely.  A
number of findings were identified resulting in limited assurance being obtained.
These included a lack of formal notification procedures, forms not being
completed in full and/or on time and a lack of routine reviews by school
management to identify staff who had left or moved.  A number of generic
accounts and higher-than-expected levels of powerful account access were also
identified.  A number of actions were agreed to address the issues identified and
these were implemented at pace following the audit.
• Missing Laptops – A review of the arrangements surrounding the delivery and
deployment of devices to Lockhart, in August 2021, was undertaken following the
reporting of lost devices from Education.  It was identified that standard receipting
and deployment processes were not adhered to at the time and supporting
documentation is no longer available due to staff leaving and a change in the IT
case management system.  As a result some devices are unaccounted for.
Actions have been identified and implemented to improve the record keeping
arrangements within Education and ICT and a full review of the school inventory
has been carried out to improve the completeness of the records held.
• Accounts Payable Transaction Testing – There was a notable uplift in the volume
and value of duplicate payments identified during the 2024/25 accounts payable
audit, including one significant duplicate.  Instances of P-Card transactions being
split into smaller portions in order to bypass approval limit thresholds were also
identified, resulting in a limited level of assurance being obtained.  Steps have
been taken since the completion of the audit to recover the funds relating to the
duplicate payments.
• Community Associations – An audit of the arrangements for ensuring that
community associations (CA) were complying with the terms of their SLAs was
undertaken and, while these were reasonable for the majority of CAs reviewed,
key control failures were noted in relation to one CA resulting in limited
assurance being obtained.  It was found that there was no formal process for
monitoring compliance with SLAs and evidence of compliance was not always
retained by the Council.  Escalation processes for non-compliance were also
required to be put in place.  Actions were agreed to improve the process going
forward and an enhanced monitoring regime has been implemented since the
completion of the audit.
• HSCP Online Bank Account – Following the notification of a potential breach of
financial regulations within the HSCP, an audit investigation reviewed the
circumstances around the set up and management of an online bank account
within the Corporate Parenting team, which was outwith the Council’s corporate
bank accounts.  Whilst there was no suggestion of misappropriation of funds a
number of findings were identified.  The audit found that purchases had been
made from the account that did not adhere to the Council’s procurement
processes, the records held for the bank account were incomplete and staff
132

Page 133

responsible for the management of the account had not completed financial
training.  Actions have since been taken to close the account and to confirm that
no other accounts of this nature exist.  The HSCP have also taken steps to
ensure that relevant staff are trained in financial management.
3.8. It is important to also highlight some of the most positive outcomes arising from the
audit work concluded during the year. This includes reviews of Pupil Equity Funding
and Transformation and Change Management, both of which are key areas of
interest for the Council, and both concluded with substantial audit opinions. This
provides evidence that the risks within these areas are being effectively managed in
line with best practice.
3.9. These findings, together with those from other audits carried out and the individual
assurance levels, contribute to the annual internal audit opinion in Annex B of this
report.
4. Audit Resources
4.1. The Internal Audit section is directly managed by the Team Manager (Internal Audit),
who reports to the Senior Manager (Audit, Fraud, Safety, Risk & Insurance). The
Senior Manager is responsible for Internal Audit, as well as Corporate Fraud, Risk
and Insurance and Corporate Health and Safety.
4.2. As well as the Team Manager, the Internal Audit team consisted of two part-time
Internal Auditors, one of which was recruited during the year, as well as a part-
time Computer Auditor.  The Senior Manager role was vacant for a portion of
the year until it was filled in August 2024.
4.3. All staff within the section hold a relevant qualification, either through an institute
which is part of the Consultative Committee of Accountancy Bodies (CCAB) or the
Institute of Internal Auditors (IIA).
4.4. The Internal Audit Charter requires the Senior Manager to report to the Section 95
Officer and the Audit and Scrutiny Committee if resources available fall below an
acceptable level for the audit work required. No material instances of resource
limitation have occurred during 2024/25.
5. Performance
5.1. During 2024/25, Internal Audit provided regular updates to the Audit and Scrutiny
Committee on the activities of the service. Elected Members had the opportunity to
discuss all Internal Audit reports and question either the Senior Manager or relevant
officers from Council services. Elected Member training was provided to the
Committee in May 2022, with individual training made available to new members
joining the Committee during the year.
5.2. The Council’s performance management system, Pentana, is used to follow-up on
audit action points. Officers with responsibility for implementing audit actions are
required to update the system and updates are provided to the Audit and Scrutiny
Committee on a quarterly basis. Where actions are overdue, officers are required to
attend the Committee to update Elected Members on plans to ensure that actions are
implemented.
133

Page 134

5.3. The Senior Manager is required to confirm annually internal audit’s compliance with
the Public Sector Internal Audit Standards (PSIAS). A significant achievement during
2022/23 was the successful completion of the External Quality Assessment. Under
the terms of the PSIAS, each organisation’s Internal Audit team is required to
undertake an External Quality Assessment (EQA) at least once in each five-year
period. This helps to ensure compliance with the standards.
5.4. A peer to peer review network of the Scottish Local Authorities Chief Internal Auditors
Group (SLACIAG) is in place. The review of the Council's Internal Audit team was
completed by West Dunbartonshire Council and was reported to the Audit and
Scrutiny Committee in September 2022. The review assessed the compliance of the
Council's Internal Audit team with the 14 sections of the PSIAS and noted that the
team fully conforms with 13 of the standards and generally conforms with the
remaining one. Overall the assessor was able to provide substantial assurance that
the Council's Internal Audit team complies with the requirements of the PSIAS. There
were four minor routine recommendations for improvement to further improve
compliance, and these have all been completed. In summary, the Internal Audit
service continues to conform with the PSIAS.
5.5. Internal Audit has a strong working relationship with all Council services and is
frequently asked for audit advice on an ad-hoc basis. The volume of these requests is
outwith the control of Internal Audit however it is important that Internal Audit
responds to these requests when asked, as it ensures advice is provided at the right
time to ensure that organisational value is maximised. In 2024/25, there were 19
requests for service advice. Added to this, Internal Audit is included on the project
board of a number of corporate working groups, and these are listed in Annex A. 
These assignments are for provision of advice and guidance and therefore do not
result in an assurance report being brought to the Committee.
6. Other Responsibilities
6.1. The Senior Manager is also the Chief Internal Auditor for the NAIJB. In the interests
of information sharing, the results of the NAIJB audit work are shared with the Audit
and Scrutiny Committee.
7. Opinion
7.1. There is a formal requirement for the Chief Internal Auditor to prepare an assurance
statement on the adequacy of internal control systems within the Council. The internal
audit annual statement on the adequacy of internal controls is included in Annex B.
8. Conclusion
8.1. The 2024/25 internal audit plan has been substantially completed. There are no
limitations of scope to the issued audit opinion.
134

Page 135

Summary of Internal Audit Work 2024/25 Annex A
Type Audit Opinion Reported to A&S
Committee
Actions Arising
Priority
1
Priority
2
Priority
3 Total
COMPLETED WORK
Assurance Code of Corporate Governance * Substantial 29 August 2024 0 0 0 0
Assurance Supply Teachers * Substantial 29 August 2024 0 0 0 0
Assurance Payroll Transaction Testing -
(23/24) * 
Reasonable 29 August 2024 0 0 0 0
Assurance Leavers & Movers in Education * Limited 31 October 2024 3 6 0 9
Assurance Property Asset Management * Reasonable 31 October 2024 1 2 0 3
Assurance Housing Rent Arrears * Substantial 31 October 2024 0 1 0 1
Assurance Community Associations Limited 31 October 2024 3 1 0 4
Investigation HSCP - Online Bank Account Limited 31 October 2024 4 1 0 5
Assurance Supported Complex Needs
Accommodation *
Reasonable 23 January 2025 3 2 0 5
Assurance Regeneration – Governance of
Funding *
Substantial 23 January 2025 0 0 0 0
Assurance ICT Environmental and Physical
Controls
Reasonable 23 January 2025 1 1 0 2
Investigation Missing Laptops Limited 23 January 2025 2 1 0 3
Assurance Pupil Equity Funding Substantial 13 March 2025 0 0 0 0
Assurance iPay Impact * Reasonable 13 March 2025 2 2 0 4
Assurance Accounts Payable Transaction
Testing
Limited 13 March 2025 3 8 0 11
Assurance Aids and Adaptations Reasonable 29 May 2025 0 5 0 5
Assurance Transformation and Change
Management Substantial 29 May 2025 0 0 0 0
Assurance Community Equipment Store Reasonable 29 May 2025 2 0 0 2
Assurance Payroll Transaction Testing -
(24/25)
Reasonable 29 May 2025 0 4 0 4
Annual
Accounts Community Councils n/a n/a n/a n/a n/a n/a
Annual
Accounts
Tenants and Residents
Associations n/a n/a n/a n/a n/a n/a
135

Page 136

Summary of Internal Audit Work 2024/25 Annex A
REPORTING PHASE**
Investigation Housing Performance Indicators Reasonable/Limited tbc tbc tbc tbc tbc
Assurance Locality Planning Reasonable tbc tbc tbc tbc tbc
WORK IN PROGRESS
Type Audit Opinion Reported to A&S
Committee
Actions Arising
Priority
1
Priority
2
Priority
3 Total
Assurance ICT Access Controls tbc tbc tbc tbc tbc tbc
Assurance ICT Information Security
Management
tbc tbc tbc tbc tbc tbc
Assurance Child Protection tbc tbc tbc tbc tbc tbc
Assurance Procurement tbc tbc tbc tbc tbc tbc
Assurance IJB - Transformation tbc tbc tbc tbc tbc tbc
Assurance Ayrshire Growth Deal tbc tbc tbc tbc tbc tbc
Assurance Homelessness tbc tbc tbc tbc tbc tbc
NOT STARTED
Assurance Income Management tbc tbc tbc tbc tbc tbc
OTHER/ONGOING
Consultancy O365/Information and
Collaboration Project Board
Not Applicable:
These assignments are for the provision of advice and guidance and therefore do not
result in an assurance report being brought to the Committee.
Consultancy Artificial Intelligence Working
Group
Consultancy CRM Project Board
Consultancy Corporate Telephony Project
Board
Consultancy Education – A365 Project Board
Consultancy Connected Communities – Grant
Funds Procedure Review
Small
Advisory 19 various requests
* 2023/24 audit but not sufficiently concluded at the time of the 2023/24 annual report, therefore opinion included in 2024/25.
** Audits not yet finalised but sufficiently in draft to conclude on the level of assurance.
136

Page 137

Annex B
Internal Audit Annual Statement on the Adequacy of Internal Controls
To the Members and Chief Executive of North Ayrshire Council
As Chief Internal Auditor for North Ayrshire Council, I am pleased to present my annual
statement on the overall adequacy and effectiveness of the framework of governance, risk
management and control of the Council for the year ended 31 March 2025.
Respective responsibilities of management and internal auditors in relation to
governance, risk management and control
It is the responsibility of the Council’s senior management to determine, establish and
maintain sound systems of governance, risk management and control to ensure that the
organisation’s resources are properly applied in a manner and on the activities intended
and that these arrangements are sufficient to address the risks facing their services. This
includes responsibility for the prevention and detection of fraud. Management is also
charged with monitoring the continuing effectiveness of these arrangements and taking
action as appropriate. It is the responsibility of the Chief Internal Auditor to provide an
annual assessment of the overall adequacy and effectiveness of the Council’s framework of
governance, risk management and control.
Sound internal controls
The main objectives of the Council’s internal control systems are to:
• ensure adherence to management policies and directives in order to achieve the
organisation’s objectives;
• safeguard assets;
• ensure the relevance, reliability and integrity of information, so ensuring as far as
possible the completeness and accuracy of records; and
• ensure compliance with statutory requirements.
Any system of control can only ever provide reasonable and not absolute assurance that
control weaknesses or irregularities do not exist or that there is no risk of material errors,
losses, fraud, or breaches of laws or regulations. Accordingly, the Council is continually
seeking to improve the effectiveness of its systems of internal control.
The work of internal audit
Internal audit is an independent, objective assurance and consulting activity designed to
add value and improve an organisation’s operations. It helps an organisation accomplish its
objectives by bringing a systematic, disciplined approach to evaluate and improve the
effectiveness of risk management, control and governance processes. During 2024/25 the
Internal Audit section operated in accordance with United Kingdom Public Sector Internal
Audit Standards (PSIAS) which came into force with effect from 1 April 2013 (updated in
March 2017). The requirements under PSIAS represent best practice and are mandatory.
137

Page 138

Annex B
The Chief Internal Auditor prepares an annual internal audit plan which outlines the
programme of work to be undertaken. The plan is developed utilising a risk-based
methodology and takes into account the requirement placed upon the Chief Internal Auditor
to deliver an annual internal audit opinion. The plan needs to be flexible to reflect the
changing risks and priorities of the organisation. The plan, and any material changes to the
plan during the year, are approved by the Audit and Scrutiny Committee.
All internal audit reports are brought to the attention of management, including system
weaknesses and/or non-compliance with expected controls, together with agreed action
plans. It is management’s responsibility to ensure that due consideration is given to internal
audit reports and that appropriate action is taken on audit recommendations. This includes
management taking remedial action where appropriate or accepting that there may be a
level of risk exposure if the weaknesses identified are not addressed for operational
reasons. Internal Audit is required to ensure that appropriate arrangements are made to
determine whether action has been taken on internal audit recommendations or that
management has understood and assumed the risk of not taking action. Matters arising
from internal audit work are also reported to the Chief Executive, Head of Finance (as
Section 95 Officer), Members of the Audit and Scrutiny Committee, and external audit.
Summary of Internal Audit Activity 2024/25
A total of 19 internal audit reports have been issued during 2024/25. 6 audit opinions give
substantial assurance, 8 reasonable assurance and 5 limited assurance. Two reports are
in draft and are anticipated to have either a reasonable or reasonable / limited assurance
opinion. A diverse range of audit areas have been covered during the year. As well as
planned assignments, Internal Audit also offers advice and guidance on the Council’s
control environment as and when required and will carry out non-fraud investigations which
are brought to our attention.
A range of recommendations have been raised in the areas covered by the 2024/25
internal audit plan. Many expected key controls have been in place and operating
effectively, however Internal Audit has also identified scope for improvement in some
systems. All 58 action points raised in the year have been accepted by management and
will result in continued improvement of the Council’s governance, risk management and
control environment.
Basis of Opinion
The evaluation of the control environment is informed by a number of sources:
• the audit work undertaken by Internal Audit during the year to 31 March 2025;
• the audit work undertaken by Internal Audit in previous years and knowledge of any
significant audit findings after the year end;
• the assessment of risk completed during the preparation of the annual audit plan;
• reports issued by the Council’s external auditors and other review and inspection
agencies;
• knowledge of the Council’s governance, risk management and performance monitoring
arrangements; and
138

Page 139

Annex B 
• any other items brought to the attention of internal audit by whatever means which may
warrant further investigation. 
Opinion 
On the above basis, Internal Audit can provide reasonable assurance over the framework
of governance, risk management and control and that adequate controls were in place and
were operating throughout the Council in 2024/25. 
John McCallum CPFA
Senior Manager (Audit, Fraud, Safety, Risk & Insurance)
29 May 2025
139

Page 140

140

Page 141

PUBLIC INFORMATION
PUBLIC INFORMATION 
NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee
Title: Corporate Fraud Team Annual Report 2024/25
Purpose: To provide the Audit and Scrutiny Committee with an update
report on the work of the Corporate Fraud Team during
2024/25.
Recommendation: That the Committee notes the work carried out by the Corporate
Fraud Team. 
1. Executive Summary 
1.1 The Corporate Fraud Team provides the Council with the capacity to investigate fraud
both within and against the organisation. 
1.2 Committee receives bi-annual updates on the work of the team. A mid-year update for
2024/25 was provided in November 2024 and this report provides an overview of the
key activities and outcomes for the full year. 
2. Background 
Investigation Work 
2.1 Referrals for investigation have been made to the team from a number of different
sources, including Revenues and Benefits and Housing, members of the public and
other agencies and local authorities. The publicity used by the team, including posters
and leaflets, and contact information on the Council website, continues to be
successful in generating a stream of referrals. 
2.2 Investigations have been carried out across a range of areas including employee-
related matters as well as Council Tax, Discretionary Housing Payments, Scottish
Welfare Fund, Blue Badges and Housing tenancy issues. Although responsibility for
investigating Housing Benefit fraud now lies with the DWP Single Fraud Investigation
Service (SFIS), issues may be identified by the Corporate Fraud Team which can
result in changes being made to benefits in payment. Formal joint working
arrangements are in place with the DWP for cases where there are suspected frauds
relating to both DWP benefits and Council Tax Reduction. 
2.3 The team investigates all tenancy abandonments which are referred by Housing.
While Housing focus on recovering the tenancy, the Corporate Fraud Team can add
Agenda Item 11
141

Page 142

PUBLIC INFORMATION
PUBLIC INFORMATION
value by locating the missing tenant, which can often lead to changes to benefits or
discounts in payment elsewhere, as well as enabling Housing to recover rent arrears
that would not have otherwise been recovered, and the costs associated with house
clearances and cleaning.
2.4 Employee-related investigations are the subject of a separate report to the appropriate
Service and the findings are also reported to the Audit and Scrutiny Committee as
each investigation is finalised. 
Outcomes 2024/25 
2.5 The team received 331 referrals for investigation during 2024/25 (2023/24: 398
referrals). All referrals made to the team are investigated although many can
subsequently prove unfounded. 
2.6 359 cases were closed during 2024/25 (2023/24: 385 cases). These can be
categorised as follows: 
Outcome Number of Cases
Closed with no issues identified 170
Referred to another agency (including SFIS) or Council
Service for investigation
76
Closed with results achieved (fraud, error or other
recovery/action)
113
TOTAL 359 
2.7 Fraud and error totalling £0.057m were identified and are categorised in the table
below: 
Category Value (£000)
Housing Benefit 9
Council Tax (including CTR, Single Person Discount
and other recoveries)
31
Housing Other (including arrears now recoverable) 4
Payments to Employees (e.g. salary, time, travel etc.) 13
TOTAL 57 
2.8 In addition to the financial outcomes noted above, other outcomes/benefits were noted
as follows: 
• 58 tenancies were recovered by Housing with some assistance from the Corporate
Fraud Team.
• 63 referrals were made to the Single Fraud Investigation Service.
• 19 referrals were made to other services, local authorities or agencies.
• In respect of blue badge cases investigated, 15 cases concluded with a warning
letter to the badge holder (2023/24: 2 warning letters), 13 warning letters were
issued to third parties (2023/24: 2 warning letters), and 7 expired badges were
recovered (2023/24: 1 badge recovery).
• 9 investigations resulted in updates and corrections to records.
• 4 internal investigation reports have been taken forward with recommended
actions for control improvements.
142

Page 143

PUBLIC INFORMATION
PUBLIC INFORMATION
International Fraud Awareness Week
2.9 International Fraud Awareness Week took place from 17 – 23 November 2024. IFAW
was promoted throughout North Ayrshire Council by social media campaign. 
National Fraud Initiative (NFI) 
2.10 The National Fraud Initiative (NFI) is a long-established exercise which takes place
across the UK every two years and involves the matching of relevant datasets across
public bodies to identify possible fraud or error for further investigation. 
2.11 The latest data sets were submitted to the Cabinet Office in October 2024, with initial
matches released in December 2024. Further releases have occurred since
December and more are expected throughout 2025. This information has, and will
continue to, be disseminated to the appropriate teams across the council for
investigation as matches are released. 
2.12 Data was uploaded in support of the ReCheck exercise (an additional data matching
service which compliments the NFI) in January, with matches released back to the
Council in January 2025 and again in March. 
Compliance with the Code of Practice 
2.13 CIPFA published their Code of Practice on Managing the Risk of Fraud and Corruption
in 2014. The Code covers five key principles which are to: 
• Acknowledge the responsibility of the governing body for countering fraud and
corruption;
• Identify the fraud and corruption risks;
• Develop an appropriate counter fraud and corruption strategy;
• Provide resources to implement the strategy; and
• Take action in response to fraud and corruption.
2.14 Each principle has specific steps which are required to be met in order to comply with
the Code. A self-assessment against the Code, its principles, and its specific steps
has been carried out. Having considered these principles, it is concluded that North
Ayrshire Council has adopted a response that is appropriate for its fraud and
corruption risks and commits to maintain its vigilance to tackle fraud. 
3. Proposals 
3.1 It is proposed that the Committee notes the work carried out by the Corporate Fraud
Team.
143

Page 144

PUBLIC INFORMATION
PUBLIC INFORMATION
4. Implications/Socio-economic Duty
Financial
4.1 None. 
Human Resources 
4.2 None.
Legal 
4.3 None. 
Equality/Socio-economic
4.4 None.
Climate Change and Carbon
4.5 None.
Key Priorities
4.6 The work of the Corporate Fraud Team helps to support the efficient delivery of the
strategic priorities within Our Council Plan 2023-2028.
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 No consultation has been required in the preparation of this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None
144

Page 145

NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee
Title: Internal Audit and Corporate Fraud Action Plans:
Quarter 4 update
Purpose: To advise the Audit and Scrutiny Committee on the progress
made by Council Services in implementing the agreed actions
from Internal Audit and Corporate Fraud reports as at 31 March
2025.
Recommendation: That the Committee notes the current position with the
implementation of Internal Audit and Corporate Fraud actions. 
1. Executive Summary 
1.1 The CIPFA document 'Audit Committee Principles in Local Authorities in
Scotland' highlights that Audit Committees should monitor and review the
progress made in implementing audit recommendations. 
1.2 Service managers are responsible for ensuring that agreed actions arising
from Internal Audit and Corporate Fraud reviews are implemented. This
provides assurance that identified control weaknesses have been addressed
and are being managed effectively. 
1.3 All actions are monitored on the Pentana system and service managers are
responsible for updating Pentana as they progress each action. This enables
Internal Audit to monitor progress on a 'real-time' basis and address any delays
in implementation. 
1.4 This report details the position as at 31 March 2025. 
2. Background 
2.1 The last report to the Audit and Scrutiny Committee on 13 March 2025
highlighted that there were 12 outstanding actions at the end of December
2024: Three actions were overdue and the remaining 9 actions had not yet
passed their due date. 
2.2 In addition to these 12 carried forward actions, there have been 15 new
actions agreed, giving a total of 27 actions for review. 
2.3 Services have completed 23 actions since the last report. All Council Services
are required to retain evidence of work carried out in completing their actions and
Internal Audit carries out 'spot-checks' on a sample of completed actions on an
ongoing basis.
Agenda Item 12
145

Page 146

2.4 The remaining 4 actions were not due for completion until after that 31 March
2025. 
3. Proposals 
3.1 It is proposed that the Committee notes the current position with the
implementation of Internal Audit and Corporate Fraud actions. 
4. Implications/Socio-economic Duty 
Financial
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities
4.6 The effective implementation of agreed Internal Audit and Corporate Fraud
actions helps to support the efficient delivery of the strategic priorities within the
Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Council Services are consulted during the completion of each Internal Audit
and Corporate Fraud review and have also provided updates on progress
made in implementing action points. 
146

Page 147

Mark
Boyd Head of
Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud,
Safety, Risk & Insurance), on 01294 324607. 
Background Papers
None.
147

Page 148

148

Page 149

PUBLIC INFORMATION
PUBLIC INFORMATION 
NORTH AYRSHIRE COUNCIL 
29 May 2025 
Audit and Scrutiny Committee 
Title:    Internal Audit Reports issued 
Purpose:  To inform the Committee of the findings of Internal Audit work
completed since March 2025. 
Recommendation:  That the Committee considers the outcomes from the Internal Audit
work completed. 
1. Executive Summary 
1.1 The Council's local Code of Corporate Governance requires effective arrangements to be
put in place for the objective review of risk management and internal control.  Internal Audit
is an important element in this framework as it reviews internal controls and offers Elected
Members and officers an objective and independent appraisal of how effectively resources
are being managed. 
1.2 The remit of the Audit and Scrutiny Committee includes the monitoring of Internal Audit
activity.  The submission of regular reports assists the Committee in fulfilling this remit. 
2. Background 
2.1 This report provides information on Internal Audit work completed since March 2025. 
Internal control reviews have been completed in respect of the areas detailed in Appendix A
to this report. The aim of these reviews is to provide assurance that the internal control
framework within the areas examined is appropriate and operating effectively. 
2.2 The findings from each audit assignment have been notified in writing to the Chief
Executive, the Section 95 Officer and the relevant Executive Director and Head of Service
on the completion of each assignment.  Where appropriate, this has included an action plan
with recommendations for improving internal control.  Appendix A includes the report and
action plan from each audit. 
2.3 The findings from 4 separate audit assignments are detailed at Appendix A to this report
and the levels of assurance for each are noted in the table below: 
Audit Title Assurance Level
Aids and Adaptations Reasonable
Transformation and Change Management Substantial
Community Equipment Store Reasonable
Payroll Transaction Testing Reasonable 
Agenda Item 13
149

Page 150

PUBLIC INFORMATION
PUBLIC INFORMATION 
3. Proposals 
3.1 It is proposed that the Committee notes the outcomes from the Internal Audit work
completed since March 2025. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The work of Internal Audit helps to support the efficient delivery of the strategic priorities
within Our Council Plan 2023-2028. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The relevant Services are consulted on Internal Audit findings during each audit
assignment. 
Mark Boyd
Head of Service (Finance) 
For further information please contact John McCallum, Senior Manager (Audit, Fraud, Safety,
Risk & Insurance), on 01294 324607. 
Background Papers
None. 
150

Page 151

PUBLIC INFORMATION  Appendix A 
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
AIDS AND ADAPTATIONS 
Assurance Level: Reasonable 
Version: Final
Date: 31/03/2025
Author: Seun Adebanjo
File Ref: 2025-PA-005
Classification: Public
151

Page 152

PUBLIC INFORMATION
PUBLIC INFORMATION 
AIDS AND ADAPTATIONS 
1 Background  
1.1 Through the Health and Social Care Partnership (HSCP), the Council assists adults
living with illness, disability or frailty to maintain their independence, by offering
equipment and adaptations which allow them to continue living in their own homes.  
1.2  On receipt of a referral, screening and triage will be carried out and if a need is
identified, the referral will be allocated to the appropriate team. An Occupational
Therapist (OT) will assess the service user and complete an OT specialist request
form via the CareFirst system detailing the aids or adaptations required.  A senior OT
will approve the OT specialist request forms. 
1.3 Jobs relating to Council tenants will either be carried out by Building Services or an
external supplier.  If the job is allocated to Building Services, a job is raised on the
Building Services URM system. 
1.4 Owner occupiers and private tenants can apply for financial assistance for aids and
adaptations.  Grants for Improvement/Repair are given by Local Authorities under a
framework set out in the Housing (Scotland) Act 2006. This process requires the
applicant to submit 3 quotes to the Council, which will be checked to ensure that the
proposal meets their needs.  Approval to progress the application will be granted by a
Senior OT. 
2 Objectives and Scope  
2.1 The main objective of this audit was to review the controls in relation to aids and
adaptations within the Health and Social Care Partnership by checking the
implementation status of prior audit recommendations and to ensure that: 
• Detailed procedures exist for the aids and adaptations process incorporating
changes to operations or legislation and its impact on aids and adaptations
activities.
• Adequate controls are in place for assessing and awarding aids and
adaptations for Council tenants as well as ensuring that work and payments are
properly approved, and follow-ups are carried out on a timely basis.
• Adequate controls are in place for the grant application process for
homeowners and private tenants as well as ensuring that; all paperwork is
completed and retained, work and payments are properly approved, and follow-
ups are carried out on a timely basis. 
• Reconciliations are undertaken to ensure that budget monitoring information is
accurate and up to date. 
2.2       The period covered by the audit is 1st April 2021 to 30th November 2024   
3 Findings 
Aids and Adaptations Process for Council Tenants 
3.1  The auditor reviewed the most current standard operating procedures (SOPs) for
Council tenants and observed that the procedures are still a work-in-progress, as
some of the documents were described as draft and did not adequately incorporate all
152

Page 153

PUBLIC INFORMATION
PUBLIC INFORMATION 
of the relevant activities of the Council. The SOPs did not include the following to aid
better understanding of the aids and adaptations process for Council tenants: 
• Brief description of Council tenants’ aids and adaptations activities.
• Brief description of the regulations guiding aids and adaptations including
Annual Return Charter (ARCs).
• Brief descriptions of stakeholders’ activities e.g. Building Services, External
Contractors etc.
• Jobs categorisation and allocation process between Building Services and
external suppliers/contractors.
• No access guidelines, including mitigations to minimise additional charges.
• Follow-up process, timelines, and escalation process.
• Allowable variations and justification process.
• Periodic reporting, timescales and purpose of each report. (action a)  
3.2  The admin team currently update the budget monitoring spreadsheet, an operational
access database and the CareFirst system at each stage of this process for all Council
tenant jobs.  All serve a different purpose. This is very time consuming for staff and
increases the risk of keying errors being made. In addition, the access database is not
supported by IT Services and is currently unprotected. (action b)  
3.3  A new processing system (Eclipse) is being developed to replace the existing
applications such as CareFirst, which is yet to be finalised, and is expected to go live
by Mid-2025.    
3.4            We reviewed the number of jobs completed during a three-month period and identified
instances where the final invoice amount was higher than the agreed amount for the
jobs, as keyed into the Building Services URM system. On further examination of the
cases identified, we found that no further approval had been obtained from a senior
OT, or Service Level Agreement (SLA) put in place between HSCP and Building
Services, to support the additional charges. (action c)  
3.5  In one of the jobs examined, we observed that the expected date of completion was
surpassed by 50 days between the specialist request form being completed and the
job being completed. Reasons for the delay were not documented in the Work-In-
Progress (WIP) report as part of follow-up exercise.  
3.6  We observed that some aids and adaptations jobs received and scoped between June
and November 2024 amounting to £190,003 are still classified as WIP as of December
2024. The reason for the long wait was not indicated in the WIP report. Further
engagement with Building Services by the auditor revealed that some of the jobs have
been completed but were still classified as WIP. (action d)   
Aids and Adaptations Process for Owner Occupiers/Private Tenants  
3.7  The auditor reviewed the grants budget monitoring spreadsheet for 2024-25 which
contained 245 referrals for grant applications and there were 125 forms with applicants
that have not progressed to the next stage. 22% of the 125 forms had been carried
over from previous years and had been pending between 2021 and 2023. We noticed
from the review of the 125 grant application forms that 29 application forms had
comments alongside them explaining the status, whereas the other 96 forms did not.
(action e) 
153

Page 154

PUBLIC INFORMATION
PUBLIC INFORMATION
3.8  The procedures and guidelines for monitoring applications did not include a guide for
chasing up outstanding paperwork, setting and tracking of timelines for the closure of
pending referrals, or the rationale for closing longstanding applications, e.g. those over
2 years old. The monitoring of applications procedure has been updated at the
suggestion of the auditor during the audit.   
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to the aids and adaptations
process.  An area of concern is the delay in a follow-up being carried out and the lack
of evidence that a follow-up has been carried out.     
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
154

Page 155

PUBLIC INFORMATION
PUBLIC INFORMATION
KEY FINDINGS AND ACTION PLAN
AIDS AND ADAPTATIONS 
Action a
Finding We have reviewed the most current standard operating
procedures (SOPs) for Council tenants and observed that the
procedures are still work-in-progress, as some of the documents
were described as draft and did not adequately incorporate all of
the relevant activities of the Council.
Action Description The SOPs should be updated to include the for better
understanding of the activities of aids and adaptations.  For
example, these should be updated to include: 
• Detailed procedures exist for the aids and adaptations
process incorporating changes to operations or legislation
and its impact on aids and adaptations activities.
• Adequate controls are in place for assessing and awarding
aids and adaptations for Council tenants as well as
ensuring that work and payments are properly approved,
and follow-ups are carried out on a timely basis.
• Adequate controls are in place for the grant application
process for homeowners and private tenants as well as
ensuring that; all paperwork is completed and retained,
work and payments are properly approved, and follow-ups
are carried out on a timely basis. 
• Reconciliations are undertaken to ensure that budget
monitoring information is accurate and up to date.
Risk Inconsistent approach by staff, possible key tasks not being
carried out and lack of business continuity if staff familiar with the
process are not available.
Priority (1, 2, 3) 2
Paragraph Reference  3.1
Managed by Sharon Hackney, AHP Senior Manager and Professional Lead
Assigned to Beth Griffin, Team Manager OT
Due Date 30/04/2025
Management Comment SOPs being updated to include requested action information. 
Completion due by 30/04/2025. 
SOP cover note/introduction developed to include aids and
adaptations activities, descriptions of regulations and legislation
guiding aids and adapts.
ARC info and brief description of stakeholder activities included in
cover note. 
Action b
Finding The admin team currently update the budget monitoring
spreadsheet, an operational access database and the CareFirst
system at each stage of the process for all Council tenant jobs. 
All serve a different purpose. This is very time consuming for staff
and increases the risk of keying errors being made.  In addition,
the access database is not supported by IT Services.
Action Description Management should investigate the feasibility of streamlining the
end-to-end process as part of the transition to Eclipse to minimise
155

Page 156

PUBLIC INFORMATION
PUBLIC INFORMATION
the number of instances where data input is required, where
possible. 
In the meantime, management should ensure that the access
database (DB) is restricted to a limited number of authorised
users only and that the DB is suitably protected (e.g. by way of
strong password) until such time as the new system has been
implemented.
Risk Inefficient use of staff time and increased risk of keying errors.
Priority (1, 2, 3) 2
Paragraph Reference  3.2
Managed by Sharon Hackney, AHP Senior Manager and Professional Lead
Assigned to Beth Griffin, Team Manager OT / Leigh-Ann Mitchell, Senior
Manager (Governance)
Due Date 30/09/2025
Management Comment Ongoing issue for a number of years with no clear
resolution.  Each system is required for individual functions, and
as such requires updated separately.   
Carefirst/Eclipse – approvals route only. We will review our
processes as part of the transition to Eclipse and will attempt to
minimise multiple data inputs where possible. 
Database needed for waiting list (individuals awaiting adaptation).
Management will ensure that the access database (DB) is
restricted to a limited number of authorised users only and that
the DB is suitably protected (e.g. by way of strong password) until
such time as the new system has been implemented. Review of
authorised users and use of a password to be completed by
30/04/2025 
Spreadsheet needed for ARC, KPIs and budget monitoring.
Integra reports for budget monitoring (this only shows invoiced,
whereas the spreadsheet shows where work has been ordered
and invoiced at different costs to original order) 
Action c
Finding A review of jobs completed revealed instances where the final
invoice amounts were higher than the agreed amount for the jobs
as keyed into the Building Services URM system. On further
examination of the cases identified, we found that no further
approval had been obtained from a senior OT, or Service Level
Agreement (SLA) put in place between HSCP and Building
Services, to support the additional charges.
Action Description An SLA should be developed between Housing, HSCP, Building
Services and PMI services which outline the agreed
arrangements for managing additional charges. The reasons for
additional charges should be recorded and subsequently
approved by HSCP management. 
Tolerances for additional costs that can be incurred without prior
agreement should be agreed and kept under review, in order to
avoid undue delays which increase the costs further. These
156

Page 157

PUBLIC INFORMATION
PUBLIC INFORMATION
additional costs should still be recorded and notified to HSCP in
retrospect.
Risk Unauthorised financial expenditure or inability to properly monitor
budget due to unplanned expenditure.
Priority (1, 2, 3) 2
Paragraph Reference  3.4
Managed by Sharon Hackney, AHP Senior Manager and Professional Lead,
Yvonne Baulk, Head of Service (Housing & Public Protection)
Assigned to Stephen Connor, Team Manager, Housing / Beth Griffin, Team
Manager OT
Due Date 30/04/2025
Management Comment SLA development and final sign off pending.  Discussion at next
Adaptations WG regarding tolerance levels and authorisations for
unforeseen costs as per email trail. 
Action d
Finding We observed that some aids and adaptations jobs received and
scoped between June and November 2024, amounting to
£190,003, are still classified as Work-in-Progress (WIP) as of
December 2024.The reason for the long wait was not included in
the WIP report. Further engagement with Building Services by the
auditor revealed that some of the jobs have been completed but
were still classified as WIP.
Action Description HSCP and Building Services should articulate in the SLA the
process for the completion of works and ensuring that
performance measures are properly monitored by the HSCP. 
Adaptations Admin should be reminded to request a follow-up
upon job completion, with OTs also reminded to record the
outcome of the follow-up on CareFirst. 
Management should ensure that monitoring is carried out to
identify and resolve instances where a follow-up has not been
carried out in a timely manner. 
Risk Difficulty in determining the status of jobs and tracking progress.
Follow-up to ensure that the service user is getting full benefit
from their aids and adaptations is not timely. 
Priority (1, 2, 3) 2
Paragraph Reference  3.6
Managed by Sharon Hackney, AHP Senior Manager and Professional Lead,
Yvonne Baulk, Head of Service (Housing & Public Protection)
Assigned to Beth Griffin, Team Manager OT
Due Date 30/04/2025
Management Comment HSCP are updated on individual job progress through email
communication and regular meetings are held between both
services.  This process will be formalised within the cross service
SLA along with the target timescales for job completion. 
Weekly completions report run on a Monday by Adaptations
Team.  Monthly meeting with Building Services to discuss
Scoping, Quotes and Operations for both HSCP and BS – WIP
hadn’t been a focus, however Agenda now developed to allow for
157

Page 158

PUBLIC INFORMATION
PUBLIC INFORMATION
WIP progress updates on a monthly basis to record progress and
reasoning for any jobs falling out with timescales.  
BS to send weekly WIP email updates to inform monthly
discussion.  
OT Team Managers to monitor follow up completions at monthly
staff supervision sessions as part of caseload management
discussions.
SOP updated to reflect the above. 
Action e
Finding The auditor reviewed the grants budget monitoring spreadsheet
for 2024-25 which contained 245 referrals for grant applications
and there were 125 forms with applicants that have not
progressed to the next stage. 
Action Description Consideration should be given to implementing a process to
chase up applications sent out, to determine if the application
should be progressed or closed off as no longer required.
Risk A client is continuing to struggle without the aids or adaptations
required to maintain their independence.
Priority (1, 2, 3) 2
Paragraph Reference  3.7
Managed by Sharon Hackney, AHP Senior Manager and Professional Lead
Assigned to Beth Griffin, Team Manager OT
Due Date Completed
Management Comment SOP updated to include chasing up of application packs sent out
to determine progress or closure. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
158

Page 159

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
TRANSFORMATION AND CHANGE MANAGEMENT 
Assurance Level: Substantial
Version: Final
Date: 3rd April 2025
Author: Anne-Marie Fenton
File Ref: 2025-PA-004
Classification: Public
159

Page 160

PUBLIC INFORMATION
PUBLIC INFORMATION
TRANSFORMATION AND CHANGE MANAGEMENT 
1 Background  
1.1 In 2020, Audit Scotland recommended in its Best Value Assurance Report that the
Council develops its transformation themes into projects and further developing the
governance arrangements to ensure the council has the skills needed to implement
the next stage of transformation and develops a robust benefits realisation tracker to
assess whether the Council has achieved its aims. The annual audit 22-23 noted
that all the recommendations from the 2020 report had been actioned.  
1.2 The Council’s Strategic Risk Register includes a high risk SRR2425_R05 “There is a
risk that transformation and change activities, which are core to the future delivery
models and long-term financial sustainability of both the Council and Health and
Social Care Partnership, fail to deliver at the level of scale and pace required.”   
2 Objectives and Scope  
2.1 The main objectives of the audit were to ensure that:
• there are adequate governance arrangements in place for transformation
workstreams.
• adequate financial monitoring arrangements are in place for the transformation
workstreams.
• there are adequate programme management arrangements in place for
transformation workstreams.   
3 Findings   
Governance Arrangements  
3.1 The Council’s Transformation Programme is overseen by the Transformation Board. 
The Board is chaired by the Chief Executive and includes all Directors and relevant
Heads of Service. The Board meets six times per year and receives updates from all
ongoing workstreams.  
3.2 All workstreams are linked to a Council Plan priority and representation from relevant
services on the Transformation Board and individual project boards ensure that the
programme is linked to appropriate strategies and policies.   
Financial Monitoring  
3.3 Financial information including target savings and costs associated with the projects
is included in the reports to the Transformation Board.  If a project diverges significantly
from its budget, options would be developed by the Project Manager and their team to
be discussed at the project board, Transformation Board or ELT, depending on the
level of impact.  
3.4 The savings from Transformation projects form part of the Council’s budget and the
financial monitoring information for the Transformation programme at a very high level
forms part of the revenue and capital budget monitoring reports that are presented to
Cabinet approximately every 2 months.  Material variances are reported to Cabinet.  
160

Page 161

PUBLIC INFORMATION
PUBLIC INFORMATION 
Programme Management  
3.5 3 workstreams within the Transformation Programme were selected for more detailed
audit testing.  These were Digital, Sustainability and Waste Services.  
3.6 The Digital workstream has recently been set up as the successor to the Accessing
Our Council workstream.  The projects from Accessing Our Council were largely
completed in the summer of 2024.  The first Working Group for the new Digital
workstream took place in February 2025 and is planned to take place every two
months, in line with the Transformation Board.  The first individual project for this
workstream is Purchase to Pay (P2P) which was in the “discovery” phase at the time
of audit testing and a risk workshop to develop the risk register was planned but had
not yet been arranged.  
3.7 The Sustainability workstream has one large, high-profile capital project, which is the
establishment of 2 Solar PV (photo-voltaic) farms at Nethermains and Shewalton.  A
second large project on Decarbonisation of the Council’s Fleet was in the process of
setting up a project board at the time of audit testing.  The Solar PV project has close
scrutiny and risk management arrangements.    
3.8 There are a number of smaller projects and activities within the Sustainability
workstream that do not have their own project board and associated documentation,
but they are reported upon at the 2-monthly Sustainability Project Board meetings,
completing a standard template for each activity to update the board on progress.  This
template does include a section for risk management where risks that arise are noted. 
Following discussions with Internal Audit, the Project Manager for the Sustainability
workstream is planning to prepare an overall risk register for the workstream.    
3.9 The Waste Review similarly has one large project, the HWRC (Household Waste
Recycling Centre) Booking System, which has recently had its own project board set
up.  The wider programme was previously discussed at service management meetings
which only took place 3 times in 2024, but the service has now set up a formal
programme board, meeting monthly since January 2025.    
3.10 The risk log for the HWRC Booking System has been completed and recently updated. 
None of the other Waste Review projects are at a stage where a risk log would be
established.     
4 Internal Audit Opinion  
4.1 Overall, substantial assurance was obtained with regard to the governance and
management of transformation projects within the Council.  The programme is
reviewed regularly at a senior level within the Council and proportionate governance
arrangements for individual workstreams sit underneath this.     
161

Page 162

PUBLIC INFORMATION
PUBLIC INFORMATION
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit.  
162

Page 163

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
COMMUNITY EQUIPMENT STORE 
Assurance Level: Reasonable
Version: Final
Date: 30th April 2025
Author: Claire Morris
File Ref: 2025-PA-006
Classification: Public
163

Page 164

PUBLIC INFORMATION
PUBLIC INFORMATION 
COMMUNITY EQUIPMENT STORE 
1 Background  
1.1 The Health and Social Care Partnership (HSCP) provides equipment to help
individuals live more safely, comfortably and independently in their own home. 
1.2 The Equipment Store (‘the Store’) in Irvine is responsible for managing three
categories of such equipment:-
• Standard equipment – this type of item is requested by Occupational
Therapists to help service users around the home.  Equipment includes items
such as raised toilet seats, bath boards, bed rails etc.  A stock of standard items
is held in the Store.  
• ‘Telecare’ – this type of item is requested by Social Workers to improve the
safety of service users within their home.  Telecare includes items such as
smoke alarms, heat sensors and door sensors, but does not include
community alarms – which are managed by the HSCP’s Technology Enabled
Care Lead Officer.  A stock of telecare items is held in the Store. 
• ‘Special order equipment’ – this type of item is required when standard
equipment does not meet the needs of the service user.  A tailored piece of
equipment will be ordered by the user’s Occupational Therapist and delivered
to the Store.  The Store will arrange its delivery to the service user.   
2 Objectives and Scope  
2.1 The objective of this audit was to ensure:-
• Stock levels are accurate and well managed
• The process for issuing stock is efficient
• All equipment is maintained to ensure it remains safe to use 
• There is a process for dealing with equipment returned to the Store 
3 Findings   
Stock Management  
3.1 The Store uses dedicated software (ELMS) to manage and record the allocation of
stock to service users. 
3.2 The accuracy of the stock information in ELMS is checked via fortnightly stock counts.    
3.3 Audit tested the accuracy of ELMS stock records by:-
• Obtaining copies of stock count records for recent stock counts
• Attending the Store and carrying out a stock count on a sample of items
• Selecting a sample of equipment purchases from Integra and ensuring ELMS
is being updated to reflect the delivered items timeously.  
3.4 Whilst no issues were noted with obtaining stock count records or during the on-site
stock count, Audit did identify 2 instances where equipment purchases (totalling
£7,099) had not been reflected in ELMS.  (action a)   
Issuing Stock  
3.5 Requests for standard stock and telecare, or the delivery of special order items, are
made by Occupational Therapists and Social Workers by completing the relevant
requisition template and submitting it to the Store.  
164

Page 165

PUBLIC INFORMATION
PUBLIC INFORMATION  
3.6 Templates from NAC officers are submitted via Carefirst and templates from NHS
officers are submitted via email.    
3.7 All requests are recorded in ELMS, with the Store:-
• Recording the request against the service user
• Allocating the item of stock to the service user
• Recording the delivery date  
3.8 The Store also notifies the original requester (via Carefirst or email) that the item has
been delivered.  
3.9 Audit selected a sample of requests and confirmed that:-
• ELMS had been fully updated
• The requisitioner had been notified of the delivery being complete. 
3.10 We identified one instance of a user’s ELMS record not fully reflecting the installed
items.  This was corrected during the Audit. (action a)   
Equipment Maintenance  
3.11 LOLER (Lifting Operations and Lifting Equipment Regulations) state that equipment
being used to lift people should be thoroughly examined six monthly.  
3.12 NAC has a collaborative contract with South and East Ayrshire for the testing of such
lifting equipment.  
3.13 The Store provides a list of all equipment needing LOLER inspection or servicing to
the contractor for action.  
3.14 Audit obtained a report of outstanding service dates as at 6 February 2025 and found
that 42 equipment checks were overdue – with 26 of these relating to 2024.  The Store
confirmed an issue with the reporting of ‘non-access’ by the contractor had resulted in
the overdue checks.  (action b) 
3.15 The Store has confirmed that all cases of non-access are now being reported by the
contractor monthly.     
Returned Equipment  
3.16 Users are asked to return equipment that they no longer need to the Store.  
3.17 The Store has equipment to wash down metal and plastic items and uses an external
company to clean fabric items.  
3.18 After cleaning, the Store Technician will assess whether an item is suitable for re-use
and record this in a log.  The Store Manager will review this and make the final decision
on whether to add the item back into stock or scrap it. 
3.19 Audit selected a sample of items from the log and ensured that stock records in ELMS
had been adjusted to reflect the re-use/scrap decision.  No issues were noted during
testing. 
165

Page 166

PUBLIC INFORMATION
PUBLIC INFORMATION
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard the controls within the
Equipment Store.    
4.2 Ensuring all outstanding LOLER testing is completed as soon as possible should be a
priority for the Service.   
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
166

Page 167

PUBLIC INFORMATION
PUBLIC INFORMATION
KEY FINDINGS AND ACTION PLAN
COMMUNITY EQUIPMENT STORE 
Action a
Finding Discrepancies in ELMS records were identified during the Audit.
Action Description Stores should investigate these discrepancies and take corrective
action as appropriate.
Risk Delays in allocating equipment to users; decisions based on
inaccurate information
Priority (1, 2, 3) 1
Paragraph Reference  3.4, 3.10
Managed by Kerry Logan, Head of Service (Health & Community Care)
Assigned to Lorraine Dyet, Senior Manager (Health & Community Care)
Due Date 06/06/25  
Management Comment A full investigation into ELMS records discrepancies has been
undertaken and corrective action to ensure accurate records has
been taken.  Following this there has been implementation of an
updated Store delivery process, with gaps in the previous process
being the identified cause of discrepancies. 
Alongside the process, the Store Manager(s) will verify deliveries
to ensure that the process is followed correctly and to highlight
any errors/prevent risk of inaccuracies - this was implemented on
the 21/03/25. 
Store processes and the issues highlighted by the audit have
been placed on HCC service risk register and will be reviewed in
an ongoing basis.   
Action b
Finding Not all LOLER servicing is being undertaken within the 6 month
timeframe set by HSE legislation.
Action Description All incidences of non-access or incomplete servicing of equipment
should be reported to the Care at Home Team as soon as
possible.  Co-ordinated action between the Stores and the Care
at Home Team should be taken to arrange access.
Risk Users and / or carers are injured by lifting equipment that has not
been serviced timeously; breach of HSE legislation; reputational
damage to the Council.
Priority (1, 2, 3) 1
Paragraph Reference  3.14
Managed by Kerry Logan, Head of Service (Health & Community Care)
Assigned to Lorraine Dyet, Senior Manager (Health & Community Care)
Due Date 06/06/25  
Management Comment Regular monthly meetings with the service provider, Arjo, are in
place to monitor and manage timescales for LOLER servicing. 
These meetings will continue to be prioritised, and late service
items is a standing agenda item.     
The Store Manager will liaise with the relevant Care at Home
Manager(s) for care at home visit times where issue with access
167

Page 168

PUBLIC INFORMATION
PUBLIC INFORMATION
have been identified – this process has been agreed with the
service provider and is in place. 
Arjo will now send weekly updates implemented from 02/04/25 in
regard to no access to allow the store to follow up accordingly and
ensure more timeous response to reduce risk. 
Communication has been issued to all Care at Home Managers
and Care at Home Assistants regarding service/Loler dates for
equipment within the community to ensure any issues are
highlighted to the Store as appropriate to allow stores to action
accordingly. 
As part of procurement exercise that Team Manager has been
involved in, issues with outstanding Service/Loler relation to
Slings has been raised and expectations clearly written into new
contract. 
Store processes and the issues highlighted by the audit have
been placed on HCC service risk register and will be reviewed in
an ongoing basis.   
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
168

Page 169

PUBLIC INFORMATION
PUBLIC INFORMATION 
INTERNAL AUDIT REPORT 
PAYROLL TRANSACTION TESTING 
Assurance Level: Reasonable
Version: Final
Date: 30th April 2025
Author: Yvonne Trundle
File Ref: 2025-PA-007
Classification: Public
169

Page 170

PUBLIC INFORMATION
PUBLIC INFORMATION 
PAYROLL TRANSACTION TESTING 
1 Background  
1.1 This audit was conducted as part of the approved 2024/25 Internal Audit Plan and data
analytic tools were used to interrogate the HR Payroll system and examined any
anomalies which arose.  
1.2 The HR Payroll system is called CHRIS.  The Employee Account is used to access
and complete internal online forms for contract amendments and terminations.  Verint
is the system used to submit contract amendments and terminations to Payroll and
Resourcing.    
1.3 The audit covered the following areas:
• Overtime 
• Working time regulations
• Last payment for leavers
• Salary amendment 
• Pay Adjustments
• High mileage claims
• High travel and subsistence claims
• Employee details
• Allowances    
2 Objectives and Scope  
2.1 The main objectives of this audit were to ensure that:
• High overtime payments are valid, properly authorised and no duplicate
overtime payments have been made.
• Employees working an average of 48+ hours per week have complied with the
working time directive regulations.
• Employees last pay is correct, properly authorised and any overpayments have
been identified and rectified.
• Salary amendments are valid and authorised.
• Pay adjustments are valid, properly authorised and no duplicate pay
adjustments have been made.
• High mileage claims are in line with the Terms and Conditions of Employment,
are valid and properly authorised.
• Travel and subsistence expenses are in line with the Terms and Conditions of
Employment, are valid and properly authorised.
• Employee details are valid and complete.
• Allowances are in line with the Terms and Conditions of Employment, are valid
and properly authorised.  
2.2 The audit covered the period 1st October 2023 to 30th September 2024.             
170

Page 171

PUBLIC INFORMATION
PUBLIC INFORMATION
3 Findings   
Overtime  
3.1 The auditor selected a sample of 10 high overtime payments based on overtime of
50% more than base pay. This testing identified an overpayment of £335.62 to a
Community Safety employee who was paid 25.6 hours as double time instead of basic
rate.  The service contacted the Payroll team and the overpayment will be recovered.  
3.2 A Building Services employee did not complete the job details section of a standby
timesheet, so only the daily totals are recorded. This was not corrected by the person
approving the timesheet.  In addition, although the overtime was approved the
approver was not an authorised signatory and when processed by Building Services,
no check was carried out against the authorised signatory list.  (action a)  
3.3 The normal overtime authorisation process was not followed by Transport resulting in
an overtime spreadsheet being emailed to Resourcing which did not have approval
from an authorised signatory. However, this was subsequently processed by
Resourcing. (action b, c)  
3.4 There were 35 potential duplicate overtime payments where payments have been
made to employees for the same overtime period but paid in a different payrun.  The
auditor reduced this number to 17 by checking payments over £100.  The results were
passed to the services to investigate which resulted in a total of 10 duplicate overtime
payments totalling £3,273.14 being identified. 
3.5 The audit identified a duplicate overtime overpayment of £728.04 for a Facilities
Management employee and Payroll advised the overpayment will be recovered. The
overtime was processed twice by the Payroll team after the employee asked the Area
Officer to check with Payroll if it had been paid. The Payroll Officer could not find the
overtime paperwork and did not check the Payroll system, in line with the procedure,
so it was rekeyed. Payroll have taken the necessary steps to remind the team member
to follow the required procedure. 
3.6 The audit identified 9 duplicate overpayments for HSCP totalling £2,545.10 and HSCP
advised the overpayments will be recovered.  The Business Support Officer in HSCP
advised that changes have been made to their current processes, including fortnightly
and monthly paid employees will no longer be keyed to CHRIS weekly and instead will
be keyed as per the payroll deadline for the relevant payrun. Also, additional checks
will be carried out on CHRIS when the system provides a warning that the overtime
being keyed is for the same overtime period to verify it is not a duplicate payment and
to ensure the employee is due overtime hours for working in a different area.   
Working Time Regulations  
3.7 The auditor calculated the average weekly working hours for the period 1 January
2024 to 30 June 2024 and there were 35 employees working an average of more than
48 hours per week. It was noted that 24 of the employees have completed a working
time regulation opt out form which is recorded on the Payroll system.  There are 11
employees with no working time regulation opt out form recorded on the Payroll system
(2 in Facilities Management, 8 in Waste Operations and 1 in Streetscene).  The Senior
Managers were contacted and all 11 employees have now completed the working time
regulation opt out form.   
171

Page 172

PUBLIC INFORMATION
PUBLIC INFORMATION
Leavers Last Pay  
3.8 The auditor selected a sample of 10 leavers to check their final pays were correct and
properly approved.  This testing resulted in the identification of 2 overpayments
totalling £3,257.41 due to the late submission of termination paperwork. Both had
already been identified and rectified by the Payroll team.  
3.9 There were 11 employees that left within 21 days of starting and the pays were
checked to ensure they were only paid for the hours worked.  This testing resulted in
the identification of 4 overpayments totalling £11,931.77 due to late termination
paperwork. All had been identified by the Payroll team and appropriate steps have
been taken to recover the funds. This included an overpayment of £4,300.23 that was
referred to the Corporate Fraud team and fully investigated.    
3.10 The auditor carried out additional tests on leavers to identify overpayments. This
resulted in 17 potential overpayments being queried with Payroll. Payroll confirmed
there had been 14 overpayments and 13 had already been identified and rectified by
Payroll. An overpayment of £334.32 (gross) for 27 November 2023 to 30 November
2023 was identified by the audit and Payroll advised an account was raised to recover
the overpayment.  
3.11 The auditor tested for employees that have left and returned to ensure there is no
overlap in contracts.  There were 3 employees found that had an overlap but further
checking confirmed that there were no findings to note.   
Salary Amendments  
3.12 A sample of 10 salary amendments were selected for audit testing.  This test identified
4 of the amendment forms were submitted after the effective date.  The payroll team
have limited control over the timing of the information that they receive however do
routinely remind contacts of the key payroll dates and deadlines.  As such no further
recommendation has been made. 
Pay Adjustments  
3.13 The auditor summarised the pay adjustments per code and carried out audit testing
on 3 of the codes.  A total of 146 payments totalling just under £800k were made under
the heading of compromise payments, a total of 2,516 payments totalling just under
£1.3m were made for pay adjustment superannuation and a total of 324 payments
totalling almost £26k were made for disturbance allowances. A sample of 15 were
checked (5 for each selected payment code).  There were no findings to note from this
testing.  
3.14 A sample of 5 potential duplicate pay adjustment payments over £500 to current
employees were also selected for audit testing.  There were no findings to report from
this testing.   
High Mileage Claims  
3.15 The auditor tested for mileage claims over 1000 miles and all 5 were checked. There
were no findings to report from this testing.     
172

Page 173

PUBLIC INFORMATION
PUBLIC INFORMATION
High Travel and Subsistence Claims  
3.16 A sample of 5 high value travel and subsistence payments were selected for audit
testing. One claim resulted in an overpayment of £205.15 as the employee keyed 373
miles under the travel column instead of the business miles column resulting in a
payment of £373 instead of a payment of £167.85. The employee confirmed this was
an error and Payroll confirmed the overpayment was recovered in their March pay.  
3.17 The auditor identified a subsistence payment made to a staff member which was made
up of 5 individual claims, however:
• The back up for only 4 of the forms could be provided by the service.
• The employee claimed mileage on each claim and claimed subsistence for fuel
supported by fuel receipts resulting in an overpayment of £303 (excluding VAT). 
A further £983.58 subsistence (excluding VAT) has been claimed and management
should review this to confirm whether additional overpayments have been made.  The
employee has not claimed subsistence since March 2024. (action d)   
Employee Details  
3.18 The auditor tested for duplicate national insurance numbers, blank national insurance
numbers, invalid national insurance format, blank date of birth, duplicate bank details
and blank bank details.  This resulted in 2 employees with the same bank details and
same name but slightly different spellings of both the first name and surname, different
NINO, different address and different date of birth. This indicates they are not the same
person. It has been passed to Corporate Fraud to investigate further. 
Allowances  
3.19 The auditor summarised the amount paid per allowance and selected the 3 allowance
codes with the highest values to check the employees were entitled to the allowance
payments. The allowances checked were Mental Health, Unsocial Hours and Cash
Preservation.  There were no findings to note from this testing. 
4 Internal Audit Opinion  
4.1 Overall, reasonable assurance was obtained with regard to transactions on the payroll
system. The audit identified a number of overpayments due to duplicate overtime claim
forms being processed and errors when claiming subsistence. In addition, there were
overpayments due to the late submission of termination forms, most of which had
already been identified and rectified by the Payroll team.    
173

Page 174

PUBLIC INFORMATION
PUBLIC INFORMATION
Definitions of Assurance Levels: 
Substantial
A sound system of governance, risk management and control exist, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited.
Reasonable
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement
were identified which may put at risk the achievement of objectives in the
area audited.
Limited
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management
and control to effectively manage risks to the achievement of objectives in
the area audited.
None
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management
and control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
NB The level of assurance given is at the discretion of Internal Audit. 
174

Page 175

PUBLIC INFORMATION
PUBLIC INFORMATION
KEY FINDINGS AND ACTION PLAN
PAYROLL TRANSACTION TESTING 
Action a
Finding A Building Services employee did not complete the job details
section of a standby timesheet, so only the daily totals are
recorded. This was not corrected by the person approving the
timesheet.  In addition, the overtime was approved but the
approver is not an authorised signatory and when processed by
Building Services, no check was carried out against the
authorised signatory list.  
Action Description Building Services should remind employees to complete all
sections of the standby timesheet, approvers should be reminded
to reject standby timesheets that are not properly completed and
the admin team should be reminded to check that overtime is
approved by an authorised signatory before processing.  
Risk Employees overtime hours might be incorrect resulting in an over
or under payment; breach of the Codes of Financial Practice. 
Priority (1, 2, 3) 2
Paragraph Reference  3.2
Managed by Yvonne Baulk, Head of Service (Housing & Public Protection)
Assigned to Billy Borthwick, Senior Manager (Operations)
Due Date 15/04/25
Management Comment All standby operatives have been briefed on how to complete the
SBY timesheet correctly through a series of 30-minute workshops
delivered by the Contract Performance team.  
All standby operatives have been updated on how to complete the
SBY timesheet fully and correctly through text message reminder
sent to all craft operatives’ mobile devices.  
All Supervisors have been reminded by Senior Officers of their
responsibility to check that all timesheets are fully and correctly
completed and will reject where this is not the case.  
Senior Officers will ensure that they add all new staff to the
approved signatory list through BS Admin Team.  
BS Admin Team will check all signatures are from approved staff
only and will reject where not. 
Action b
Finding The normal overtime authorisation process was not followed by
Transport resulting in an overtime spreadsheet being emailed to
Resourcing which did not have approval from an authorised
signatory. However, this was subsequently processed by
Resourcing.
Action Description The Resourcing team should be reminded to ensure that overtime
is approved by a relevant authorised signatory before being
processed and should be returned if proper approval is not
provided. 
Risk Employees overtime hours might be incorrect resulting in an over
or under payment; breach of the Codes of Financial Practice 
Priority (1, 2, 3) 2
Paragraph Reference  3.3
175

Page 176

PUBLIC INFORMATION
PUBLIC INFORMATION
Managed by Fiona Walker, Head of Service (People & ICT)
Assigned to Jackie Smillie, Senior Manager (People Services)
Due Date Complete
Management Comment The Resourcing team have been reminded of the importance of
checking authorised signatories and have been advised that
overtime which has not been authorised by a relevant signatory
must be returned for appropriate approval. The Resourcing Team
review the Authorised Signatory screen to confirm the relevant
signatory is current. 
Action c
Finding The normal overtime authorisation process was not followed by
Transport resulting in an overtime spreadsheet being emailed to
Resourcing which did not have approval from an authorised
signatory. However, this was subsequently processed by
Resourcing.
Action Description Transport management should reinforce the overtime approval
processes currently in place and to ensure that these are adhered
to by admin staff to ensure that the email to Resourcing includes
evidence of approval by an authorised signatory.
Risk Employees’ overtime hours might be incorrect resulting in an over
or under payment; breach of the Codes of Financial Practice
Priority (1, 2, 3) 2
Paragraph Reference  3.3
Managed by Laurence Cree, Head of Service (Sustainability, Transport &
Corporate Property)
Assigned to Gordon Mitchell, Senior Manager (Transport)
Due Date Complete
Management Comment This was an administrative error as any weekly  overtime  /
additional hours are sent to Resourcing on a Monday morning and
authorised signatories are copied in for verification. Unfortunately
on this occasion the employee forgot to include the relevant
manager.
The admin team have been reminded of the process and advised
to be more careful going forward. 
Action d
Finding The auditor identified a subsistence payment made to a staff
member which was made up of 5 individual claims, however:
• The back up for only 4 of the forms could be provided by
the service.
• The employee claimed mileage on each claim and claimed
subsistence for fuel supported by fuel receipts resulting in
an overpayment of £303 (excluding VAT). 
A further £983.58 subsistence (excluding VAT) has been claimed
and management should review this to confirm whether additional
overpayments have been made.  The employee has not claimed
subsistence since March 2024. 
Action Description The service should request the employee reimburses the £303
overpayment for subsistence.  The service should investigate any
additional overpayments that should be reimbursed by the
employee. 
Risk Overpayment of travel and subsistence allowance
176

Page 177

PUBLIC INFORMATION
PUBLIC INFORMATION
Priority (1, 2, 3) 2
Paragraph Reference  3.17
Managed by Kerry Logan, Head of Service (Health & Community Care)
Assigned to Loraine Dyet, Senior Manager (Locality Services) and Louise
Davidson, Senior Manager (Health & Community Care)
Due Date 30/05/25
Management Comment A number of meetings have taken place with the Business
Support Team, Senior Management and Operational Team
Manager to undertake a full review and to avoid ensure steps are
put in place to prevent recurrence. 
The following actions have been implemented: 
• Detailed guidance to be included within sample mileage
claims at CAH induction course.
• Formal discussion has taken place with line manager and
guidance reissued to full team.
• Once total reimbursement figure has been confirmed by
Business Support, they will inform Team Manager and Line
Manager. 
• Line manager will confirm reimbursement payment with
employee and formal discussion to be recorded within
employee file. 
• Further claim forms submitted by the employee following
date of audit period have been reviewed, no actions were
required. 
• SOP and guidance issued to clerical team on Arran
regarding mileage claims which will be audited internally
by Business Support. 
Priority Key used in Action Plan 
1 (High) Control weakness where there is a material impact on the achievement of the
control objectives, generally requiring prompt attention.
2 (Medium) Control weakness which needs to be rectified, but where there is no material
impact on the achievement of the control objectives.
3 (Low) Minor weakness or points for improvement. 
177