Agenda Document Pack - Audit and Scrutiny Committee - 24/09/2026

North Ayrshire Council · 24 September 2026
Back to Audit and Scrutiny Committee — 24 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Audit and Scrutiny Committee 
A Special Meeting of the Audit and Scrutiny Committee of North Ayrshire Council
will be held in the Council Chambers, Ground Floor, Cunninghame House, Irvine,
KA12 8EE on Thursday, 24 September 2026 at 10:00 to consider the undernoted
business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.   Where possible, the meeting will be live-streamed
and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 External Audit Report on the 2025/26 Audit
Submit report by the Head of Service (Finance) on the Annual Audit report
for 2025/26 and to consider the verbal report by the external auditor (copy
enclosed). 
3 Our Council Plan Year End Progress Reporting
Submit report by the Head of Service (Democratic) on the progress in
delivering Our Council Plan 2023 to 2028 as at Year End 2025 to 2026
(copy enclosed). 
4 Annual Assurance Statement to the Scottish Housing Regulator
2025/26
Submit report by the Executive Director (Communities and Housing) on the
Council’s Annual Return on the Charter 2025/26 submission (copy
enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting  
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home,where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.    
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.    
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.    
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact  dataprotectionofficer@north-ayrshire.gov.uk 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Audit and Scrutiny Committee Sederunt 
John Bell (Chair)
Donald Reid (Vice Chair)
Cameron Inglis
Shaun Macaulay
Tom Marshall
Matthew McLean
Davina McTiernan
Donald L. Reid
John Sweeney 
Chair: 
Apologies: 
Attending: 
3

Page 4

4

Page 5

NORTH AYRSHIRE COUNCIL 
24 September 2026 
Audit & Scrutiny Committee 
Title:    External Audit Report on the 2025/26 Audit 
Purpose:  To invite Committee to note the Annual Audit Report for 2025/26
and to consider the verbal report by the external auditor. 
Recommendation:  That Committee: 
(a) Notes the findings of the 2025/26 audit of the financial 
statements as contained in the external auditor’s Annual
Audit Report at Appendix 2; 
(b) Considers the verbal report by the external auditor;
(c) Notes the agreed Action Plans as outlined in Appendix 1 of
the Annual Audit Report and
(d) Approves the audited Annual Accounts for signature. 
1. Executive Summary 
1.1 As part of the external audit for 2025/26, Audit Scotland have produced the attached
Annual Audit Report which includes an opinion on the Council’s financial statements,
wider scope audit and best value. 
1.2  The unaudited accounts for the year to 31 March 2026 were approved by Council on
24 June 2026 and submitted to the Council’s external auditor, Audit Scotland, for
audit. The Audit Director for Audit Scotland has now issued their proposed 
Independent Auditor’s Report on the financial statements which is free from
qualification and confirms that the accounts give a true and fair view of the state of
affairs of the Council, its group and the Council’s charitable trusts as at 31 March
2026. 
Agenda Item 2
5

Page 6

1.3  The overall conclusions of the reports state that the Council: 
• The Council has effective and appropriate arrangements in place for Financial
Management; Financial Sustainability; Vision, Leadership and Governance; and
Use of Resources to Improve Outcomes
• Financial management is effective;
• The Council has appropriate governance and decision-making arrangements
however improvements could be made regarding timely completion of elected
member registers of interest and increased attendance at member training; 
• The Council’s performance, taken from national benchmarking data, shows an
improved position over time; and
• The Council’s has appropriate arrangements in place for securing Best Value and
preparing and publishing statutory performance information. 
1.4  As detailed in Exhibit 5 of the Annual Audit Report, a number of adjustments have
been identified during the audit process. These adjustments are mainly presentational
or in relation to the valuation of non-current assets.  The overall balance of Useable
reserves remains unchanged however £1.496m has been moved from Unearmarked
to Earmarked Reserves following Council decision on the 24 June 2026. 
1.5 Audit Scotland’s report includes action plans in relation to the recommendations for
improvement identified during the course of the audit. Full details of these and the
proposed management actions are included in appendix 1 to the report. 
2. Background 
2.1 The 2025/26 audit of the Council’s accounts was conducted by Audit Scotland, the
fourth of a five-year cycle as the Council’s appointed external auditors. 
2.2  Appendix 1 includes letters of representation to be signed by the Head of Finance as
the responsible officer for North Ayrshire Council. Audit Scotland’s annual report to
members, which summarises the findings of their audit, is attached at Appendix 2. 
2.3  The Council’s accounts for the year to 31 March 2026 were submitted to Audit
Scotland by the deadline of 30 June 2026. The external auditor is required to report
on certain matters arising to those charged with governance in sufficient time to
enable appropriate action to be taken before the financial statements are approved
and certified. Audit Scotland has issued an unmodified report on the accounts of the
Council and its charitable trusts confirming that they show a true and fair view of the
financial position. 
2.4  During the audit, Audit Scotland and Council officers identified two errors relating to
classification of assets.  The total value of these errors and adjustments was
£6.249m. These have been corrected in the Audited Annual Accounts. 
2.5 In addition, Audit Scotland has identified a mis categorisation between Long term and
Short term investments of £5.000m, again, this has been corrected in the Audited
Annual Accounts. 
2.6 In relation to the Council’s charitable trusts, Audit Scotland have issued an unqualified
opinion in relation to the charitable trust accounts.
6

Page 7

2.7  The report notes that the auditor has received a statutory objection to the accounts
relating to the Common Good and Trust Funds and has met with the objector to
consider the issues and evidence provided. The auditor has concluded that the issues
raised are not material to their opinion.
2.8  A link to the final audited accounts will be issued to all members for their information.
2.9  Representatives from Audit Scotland will be in attendance at Committee and will
present a verbal report highlighting the main findings of the 2025/26 report. 
3. Proposals 
3.1 It is proposed that Committee: 
(a)  Notes the findings of the 2025/26 audit of the financial statements as contained in
the external auditor’s Annual Audit Report at Appendix 2; 
(b) Considers the verbal report by the external auditor;
(c) Notes the agreed Action Plans as outlined in Appendix 1 of the Annual Audit
Report; and
(d) Approves the audited Annual Accounts for signature. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. 
Human Resources 
4.2 None. 
Legal 
4.3 Under the Local Authority Accounts (Scotland) Regulations 2014 the Council is required
to approve the audited Annual Accounts for signature by 30 September 2026. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by maximising financial
flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None.
7

Page 8

Islands Communities Impact Assessment (ICIA)
4.8 None.
United Nations Rights of the Child (UNCRC)
4.9 None.
Consumer Duty
4.10 None.
5. Consultation
5.1 The Chief Executive, Executive Directors and other appropriate officers have been
consulted as part of the audit process.
Mark Boyd
Head of Service (Finance)
For further information please contact Natalie Graham, Senior Manager (Corporate
Finance) Financial Management, on 01294 324533. 
Background Papers
North Ayrshire Council Unaudited Accounts 2025/26 –Council, 24 June 2026; 
North Ayrshire Council Charitable Trusts: Unaudited Trustees’ Annual Report 2025/26 –
Council, 24 June 2026  
8

Page 9

HEAD OF FINANCE:  Mark Boyd
Cunninghame House, Irvine KA12 8EE
Tel: 01294 310000  Fax: 01294 324544
www.north-ayrshire.gov.uk
Your Ref: Our Ref: 
If telephoning please call:  01294 310000
Or email:  chief.executive@north-ayrshire.gov.uk
24 September 2026
Louisa Yule CPFA, Audit Director
Audit Scotland
4th Floor, The Athenaeum Buildings
8 Nelson Mandela Place
Glasgow 
G2 1BT
Dear Louisa,
North Ayrshire Council Annual Accounts 2025/26
This representation letter is provided in connection with your audit of the annual accounts
of North Ayrshire Council and its group, hereafter referred to as North Ayrshire Council, for
the year ended 31 March 2026 for the purpose of expressing an opinion as to whether the
financial statements give a true and fair view and have been properly prepared, and for
expressing other opinions on the Remuneration Report, Management Commentary, and
Annual Governance Statement.
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your
audit of North Ayrshire Council’s annual accounts for the year ended 31 March 2026.
General
I have fulfilled my responsibilities for the preparation of the 2025/26 annual accounts as
set out in your 2025/26 Annual Audit Plan. All the accounting records, documentation, and
other matters which I am aware are relevant to the preparation of the annual accounts
have been made available to you for the purposes of your audit. All transactions
undertaken by North Ayrshire Council have been recorded in the accounting records and
are properly reflected in the financial statements.
I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. As you have reported, there are no
uncorrected misstatements. 
Financial Reporting Framework
The annual accounts have been prepared in accordance with the Code of Practice on
Local Authority Accounting in the United Kingdom 2025/26 (2025/26 Code) and the
requirements of the Local Government (Scotland) Act 1973, the Local Government in
Scotland Act 2003, and the Local Authority Accounts (Scotland) Regulations 2014. 
Appendix 1
9

Page 10

In accordance with the Local Authority Accounts (Scotland) Regulations 2014, I have
ensured that the financial statements give a true and fair view of the financial position of
North Ayrshire Council at 31 March 2026 and the transactions for 2025/26. 
Accounting Policies and Estimates 
All material accounting policies applied are as shown in the note included in the financial
statements. The accounting policies are determined by the 2025/26 Code, where
applicable. Where the 2025/26 Code does not specifically apply, I have used judgement in
developing and applying an accounting policy that results in information that is relevant
and reliable. All accounting policies applied are appropriate to North Ayrshire Council’s
circumstances and have been consistently applied. 
The methodology, significant assumptions, and data used in making accounting estimates
are reasonable, and have been properly reflected and disclosed in the financial statements
in accordance with the 2025/26 Code. Judgements made in making estimates have been
based on the latest available and reliable information. Estimates have been revised where
there are changes in the circumstances on which the original estimate was based or as a
result of new information or experience. 
Going Concern Basis of Accounting 
I have assessed North Ayrshire Council’s ability to continue to use the going concern basis
of accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on North Ayrshire Council’s ability to continue
to adopt the going concern basis of accounting. 
Assets 
All assets at 31 March 2026 of which I am aware have been reported in the financial
statements. 
All assets as at 31 March 2026 have been valued and / or indexed in line with the
accounting polices around asset valuations. 
I carried out an assessment at 31 March 2026 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified in the
financial statements. 
I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2026. 
There are no plans or intentions that are likely to affect the carrying value or classification
of the assets recognised in the financial statements. 
Owned assets are free from any lien, encumbrance, or charge, except as disclosed in the
financial statements. 
Liabilities  
All liabilities at 31 March 2026 of which I am aware have been reported in the financial
statements. 
10

Page 11

Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2026 of which I am aware where the conditions specified in
IAS 37, as adapted by the 2025/26 Code, have been met. The amount recognised as a
provision is the best estimate of the expenditure likely to be required to settle the obligation
at 31 March 2026. Where the effect of the time value of money is material, the amount of
the provision has been discounted to the present value of the expected payments. 
Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2026, or to reflect material changes in
the assumptions underlying the calculations of the provisions. 
The accrual recognised in the financial statements for annual leave untaken by 31 March
2026 has been estimated on a reasonable basis. 
There are no plans or intentions that are likely to affect the carrying value or classification
of the liabilities recognised in the financial statements. 
Contingent Liabilities 
There are no significant contingent liabilities, other than those disclosed in Note 33 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the financial statements. All known contingent liabilities have been
fully and properly disclosed in accordance with IAS 37, as adopted by the 2025/26 Code. 
Litigation and Claims 
All known actual or possible legal claims have been disclosed to you and have been
accounted for and disclosed in the financial statements in accordance with the 2025/26
Code. 
Fraud 
I understand my responsibilities for the design, implementation, and maintenance of
internal control to prevent fraud and I believe I have appropriately fulfilled those
responsibilities. 
I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
as a result of fraud,
• any allegations of fraud or suspected fraud affecting the financial statements, and 
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect
on the financial statements. 
Laws and Regulations 
I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements. 
Related Party Transactions 
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the
11

Page 12

2025/26 Code. I have made available to you the identity of all of North Ayrshire Council’s
related parties and all the related party transactions of which I am aware. 
Remuneration Report 
The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Regulations 2014, and all required information of which I am aware
has been provided to you. 
Management Commentary 
I confirm that the Management Commentary has been prepared in accordance with
statutory guidance, and the information is consistent with the financial statements. 
Corporate Governance 
I confirm North Ayrshire Council has undertaken a review of the system of internal control
during 2025/26 to establish the extent to which it complies with proper practices set out in
Delivering Good Governance in Local Government: Framework 2016. I have disclosed to
you all deficiencies in internal control identified from this review or of which I am otherwise
aware. 
I confirm that the Annual Governance Statement has been prepared in accordance with
the Delivering Good Governance in Local Government: Framework 2016 and the
information is consistent with the financial statements. There have been no changes in the
corporate governance arrangements, or issues identified, since 31 March 2026 which
require to be reflected in the Annual Governance Statement or annual accounts. 
Group Accounts 
I have identified all the other entities in which North Ayrshire Council has an interest and
have classified and accounted for them in accordance with the 2025/26 Code. Any
significant issues, including those related to fraud and any qualified audit opinions, in
relation to the financial statements of group entities, have been provided to you. Any
significant issues identified by you as group auditor have been communicated to
management of group components, where relevant to those components. 
Events Subsequent to the Date of the Balance Sheet 
All events subsequent to 31 March 2026 for which IAS 10, as adopted by the 2025/26
Code, requires adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Mark Boyd 
Head of Finance
North Ayrshire Council
Section 95 Officer
12

Page 13

HEAD OF FINANCE:  Mark Boyd
Cunninghame House, Irvine KA12 8EE
Tel: 01294 310000  Fax: 01294 324544
www.north-ayrshire.gov.uk   
Your Ref:  Our Ref:  
If telephoning please call:  01294 310000
Or email:  chief.executive@north-ayrshire.gov.uk 
24 September 2026 
Inire Evong,
Audit Scotland 
4th Floor, The Athenaeum Building
8 Nelson Mandela Place
Glasgow
G2 1BT 
Dear Inire, 
North Ayrshire Council Charitable Trust Funds Annual Accounts 2025/26 
This representation letter is provided in connection with your audit of the annual accounts
of the North Ayrshire Council Charitable Trust Funds, for the year ended 31 March 2026
for the purpose of expressing an opinion as to whether the financial statements give a true
and fair view and have been properly prepared, and for expressing other opinions on the
Trustees Report. 
I confirm to the best of my knowledge and belief, and having made such enquiries as I
considered necessary, the following representations given to you in connection with your
audit of North Ayrshire Council Charitable Trust Funds Annual Accounts for the year
ended 31 March 2026. 
General 
I have fulfilled my responsibilities for the preparation of the 2025/26 annual accounts as
set out in your 2025/26 Annual Audit Plan. All the accounting records, documentation, and
other matters which I am aware are relevant to the preparation of the annual accounts
have been made available to you for the purposes of your audit. All transactions
undertaken by North Ayrshire Council Charitable Trust Funds have been recorded in the
accounting records and are properly reflected in the financial statements. 
As you have reported, there are no uncorrected misstatements. 
Financial Reporting Framework 
The annual accounts have been prepared in accordance with the Charities and Trustee
Investment (Scotland) Act 2005, and regulations 9(1), (2) and (3) of the Charities Accounts
(Scotland) Regulations 2006. 
In accordance with the Charities Accounts (Scotland) Regulations 2006, I have ensured
that the financial statements give a true and fair view of the financial position of North
Ayrshire Council Charitable Trust Funds at 31 March 2026 and the transactions for
2025/26. 
13

Page 14

Accounting Policies and Estimates 
All material accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2025/26 Code, where
applicable. Where the 2025/26 Code does not specifically apply, I have used judgement in
developing and applying an accounting policy that results in information that is relevant
and reliable. All accounting policies applied are appropriate to North Ayrshire Council
Charitable Trust Funds’ circumstances and have been consistently applied. 
Going Concern Basis of Accounting 
I have assessed North Ayrshire Council Charitable Trust Funds’ ability to continue to use
the going concern basis of accounting and have concluded that it is appropriate. I am not
aware of any material uncertainties that may cast significant doubt on North Ayrshire
Charitable Trust Funds’ ability to continue to adopt the going concern basis of accounting.
Assets 
The cash fund, land and buildings and investments shown in the Statement of Balances at
31 March 2026 were owned by the registered charities. Assets are free from any lien,
encumbrance, or charge except as disclosed in the financial statements. There are no
plans or intentions that are likely to affect the carrying value of classification of the assets
within the financial statements. 
Liabilities 
There are no liabilities at 31 March 2026 of which I am aware. This is reflected in the
financial statements. 
Contingent Liabilities 
There are no significant contingent liabilities, arising either under formal agreement or
through formal undertakings, requiring disclosure in the financial statements. 
Litigation and Claims 
All known actual or possible legal claims have been disclosed to you and have been
accounted for and disclosed in the financial statements in accordance with the 2025/26
Code. 
Fraud 
I understand my responsibilities for the design, implementation, and maintenance of
internal control to prevent fraud and I believe I have appropriately fulfilled those
responsibilities. 
I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
as a result of fraud,
• any allegations of fraud or suspected fraud affecting the financial statements, and 
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect
on the financial statements. 
14

Page 15

Laws and Regulations 
I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements. 
Related Party Transactions 
All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with IAS 24, as adopted by the
2025/26 Code. I have made available to you the identity of all of North Ayrshire Council
Charitable Trust Funds’ related parties and all the related party transactions of which I am
aware. 
Corporate Governance 
I confirm North Ayrshire Council (administering authority) has undertaken a review of the
system of internal control during 2025/26 to establish the extent to which it complies with
proper practices set out in Delivering Good Governance in Local Government: Framework
2016. I have disclosed to you all deficiencies in internal control identified from this review
or of which I am otherwise aware. 
Events Subsequent to the Date of the Balance Sheet 
All events subsequent to 31 March 2026 for which IAS 10, as adopted by the 2025/26
Code, requires adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Mark Boyd
Head of Finance
15

Page 16

North Ayrshire
Council
2025/26 Annual Audit Report
Prepared for North Ayrshire Council and the Controller of Audit
September 2026
Appendix 2
16

Page 17

North Ayrshire Council: 2025/26 Annual Audit Report | 2 
Contents 
Summary of audit opinions and conclusions 3
Introduction 5
Audit scope, responsibilities, and fee 6
Audit of the annual accounts 9
Wider scope audit 23
Best Value audit 44
Appendix 1 53
Appendix 2 63 
Accessibility
You can find out more and read this report using assistive technology on
our website www.audit.scot/accessibility.
Appendix 2
17

Page 18

Summary of audit opinions and conclusions | 3 
Summary of audit opinions and
conclusions 
Audit of the annual accounts
1 All audit opinions stated that the annual accounts were free from material
misstatement. 
2 There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed by
North Ayrshire Council.
Wider scope audit
3 North Ayrshire Council has effective and appropriate arrangements in place
for Financial Management; Financial Sustainability; Vision, Leadership and
Governance; and Use of Resources to Improve Outcomes.
4 Financial management is effective. The council reported an underspend
against the general services budget of £21.4 million following underspends in
capital finance costs, employee costs and increased income across services.
Usable reserves increased by £17.2 million to £147.1 million at 31 March
2026. Of this £49.6 million is earmarked for the Prudential Investment Fund
which will support borrowing costs for the Capital Investment Programme.
5 The Medium-Term Financial Outlook was updated in November 2025 whilst
the Medium-Term Financial Plan (MTFP) 2026/27 to 2028/29 was approved
in February 2026. The MTFP showed a cumulative gap of £61.6 million over
the three-year period. The council approved a balanced budget for 2026/27.
This included a savings package of £7.3 million, increasing council tax by
8.5% and the planned utilisation of £3.5 million of reserves.
6 Governance arrangements in place are effective however improvements
could be made regarding the timely completion of elected members registers
of interest as well as increased levels of attendance at member training
events.
Appendix 2
18

Page 19

Summary of audit opinions and conclusions | 4 
7 Performance reporting arrangements are well established. National
benchmarking data shows the council’s performance has improved over time,
but performance is mixed when compared to the prior year with 50% of
indicators improving whilst performance declined for 27%.
Best Value audit 
8 North Ayrshire Council has effective and appropriate arrangements in place
for securing Best Value. 
9 North Ayrshire Council has effective and appropriate arrangements in place
for preparing and publishing statutory performance information. 
Appendix 2
19

Page 20

Introduction | 5 
Introduction 
Purpose of the Annual Audit Report
1.  The purpose of this Annual Audit Report is to report the significant
matters identified from the 2025/26 audit of North Ayrshire Council annual
accounts and the wider scope areas specified in the Code of Audit
Practice (2021).
2.  The Annual Audit Report is addressed to North Ayrshire Council,
hereafter referred to as ‘the council’ and the Controller of Audit and will be
published on Audit Scotland’s website in due course. 
Appointed auditor and independence
3.  Louisa Yule (CPFA), of Audit Scotland, has been appointed as external
auditor of the council for the period from 2025/26 until 2026/27. Louisa
Yule as engagement lead and the audit team are independent of the
council in accordance with relevant ethical requirements, including the
Financial Reporting Council’s Ethical Standard. There have been no
developments since the issue of the Annual Audit Plan that impact on the
continued independence of the engagement lead or the rest of the audit
team from the council, including no provision of non-audit services. 
Acknowledgements
4.  We would like to thank the council and its staff, particularly those
involved in preparation of the annual accounts, for their cooperation and
assistance during the audit. We look forward to working together
constructively over the remainder of the five-year audit appointment.
Appendix 2
20

Page 21

Audit scope, responsibilities, and fee | 6 
Audit scope, responsibilities, and
fee 
Scope of the audit 
5.  The audit is performed in accordance with the Code of Audit Practice,
including supplementary guidance, International Standards on Auditing
(ISA) (UK), and relevant legislation. These set out the requirements for the
scope of the audit which includes: 
• An audit of the financial statements and an opinion on whether they
give a true and fair view and are free from material misstatement. 
• An opinion on statutory other information published with the
financial statements in the annual accounts, namely the
Management Commentary and Annual Governance Statement.
• An opinion on the audited part of the Remuneration Report. 
• Conclusions on the council’s arrangements in relation to the wider
scope areas: Financial Management; Financial Sustainability;
Vision, Leadership and Governance; and Use of Resources to
Improve Outcomes. 
• Reporting on the council’s arrangements for securing Best Value.
• Providing assurance on the Housing Benefit Subsidy Claim, Non-
Domestic Rates Return, Whole of Government Accounts return,
and summary financial statements. 
• A review of the council’s arrangements for preparing and publishing
statutory performance information. 
• Provision of this Annual Audit Report.
Responsibilities and reporting
6.  The Code of Audit Practice sets out the respective responsibilities of the
council and the auditor. A summary of the key responsibilities is outlined
below. 
Auditor’s responsibilities
7.  The responsibilities of auditors in the public sector are established in
the Local Government (Scotland) Act 1973. These include providing an
Appendix 2
21

Page 22

Audit scope, responsibilities, and fee | 7 
independent opinion on the financial statements and other information
reported within the annual accounts and concluding on the council’s
arrangements in place for the wider scope areas and Best Value.
8.  The matters reported in the Annual Audit Report are only those that
have been identified by the audit team during normal audit work and may
not be all that exist. Communicating these does not absolve the council
from its responsibilities outlined below. 
9.  The Annual Audit Report includes an agreed action plan at Appendix 1
setting out specific recommendations to address matters identified and
includes details of the responsible officer and dates for implementation.
The council’s responsibilities
10.  The council has primary responsibility for ensuring proper financial
stewardship of public funds, compliance with relevant legislation and
establishing effective arrangements for governance, propriety, and
regularity that enables it to successfully deliver its objectives. The features
of proper financial stewardship include: 
• Establishing arrangements to ensure the proper conduct of
its affairs. 
• Preparation of annual accounts, comprising financial statements for
the council and its group that gives a true and fair view and other
specified information. 
• Establishing arrangements for the prevention and detection of
fraud, error and irregularities, and bribery and corruption. 
• Implementing arrangements to ensure its financial position is
soundly based. 
• Making arrangements to secure Best Value. 
• Establishing an internal audit function.
Audit Fee
11.  The audit fee for the 2025/26 audit was reported in the Annual Audit
Plan and was set at £401,680 (2024/25 £384,980). We also agreed an
audit fee of £1,100 for the audit of the registered charities administered by
the council (2024/25 £1,100). There have been no developments that
impact on planned audit work required, therefore the audit fee reported in
the Annual Audit Plan remains unchanged. 
National performance audit reporting
12.  The Auditor General for Scotland and the Accounts Commission
regularly publish performance audit reports. These cover a range of
matters, many of which may be of interest to the council and Audit and
Appendix 2
22

Page 23

Audit scope, responsibilities, and fee | 8 
Scrutiny Committee. Details of national and performance audit reports
published over the last year can be seen in Appendix 2.
Appendix 2
23

Page 24

Audit of the annual accounts | 9 
Audit of the annual accounts 
Main judgements
All audit opinions stated that the annual accounts were free from
material misstatement. 
There were no significant findings or key audit matters to report. All audit
adjustments required to correct the financial statements were processed
by the council.
Audit opinions on the annual accounts
13.  The council and its group’s annual accounts were approved by Audit
and Scrutiny Committee on 24 September 2026 and certified by the
appointed auditor on 24 September 2026. The Independent Auditor’s
Report is included in the council’s annual accounts, and this reports that,
in the appointed auditor’s opinion, these were free from material
misstatement. 
Audit timetable 
14.  The unaudited annual accounts and all working papers were received
on 25 June 2026 in accordance with the agreed audit timetable. The
Annual Accounts and supporting working papers were of a good standard.
Finance staff provided good support to the audit team which helped
ensure the smooth running of the final accounts audit process. 
Materiality
15.  The concept of materiality is applied by auditors in planning and
performing an audit, and in evaluating the effect of any uncorrected
misstatements on the financial statements or other information reported in
the annual accounts.
16.  Broadly, the concept of materiality is to determine whether
misstatements identified during the audit could reasonably be expected to
influence the decisions of users of the annual accounts. Auditors set a
monetary threshold when determining materiality, although some issues
may be considered material by their nature. Therefore, materiality is
ultimately a matter of the auditor’s professional judgement.
17.  Materiality levels for the audit of the council and its group were
determined at the risk assessment phase of the audit and were reported in
Appendix 2
24

Page 25

Audit of the annual accounts | 10 
the Annual Audit Plan, which also reported the judgements made in
determining materiality levels. These were reassessed on receipt of the
unaudited annual accounts. Materiality levels were updated and these can
be seen in Exhibit 1.
Exhibit 1
2025/26 Materiality levels for the council and its group 
Materiality The council Group
Materiality – set at 2% of gross expenditure £13.6 million £17.8 million
Performance materiality – set at 65% of materiality.
As outlined in the Annual Audit Plan, this acts as a
trigger point. If the aggregate of misstatements
identified during the audit exceeds performance
materiality, this could indicate further audit procedures
are required. 
£8.9 million £11.6 million
Reporting threshold – set at 5% of materiality.  £0.7 million £0.9 million
Source: Audit Scotland
Significant findings and key audit matters 
18.  ISA (UK) 260 requires auditors to communicate significant findings
from the audit to those charged with governance, which for the council is
Audit and Scrutiny Committee.
19.  The Code of Audit Practice also requires public sector auditors to
communicate key audit matters. These are the matters that, in the
auditor’s professional judgement, are of most significance to the audit of
the financial statements and require most attention when performing
the audit. 
20.  In determining key audit matters, auditors consider:
• Areas of higher or significant risk of material misstatement. 
• Areas where significant judgement is required, including accounting
estimates that are subject to a high degree of estimation
uncertainty. 
• Significant events or transactions that occurred during the year.
21.  The significant findings and key audit matters to report are outlined in
Exhibit 2. 
Appendix 2
25

Page 26

Audit of the annual accounts | 11 
Exhibit 2 
Significant findings and key audit matters 
Significant findings and key audit matters Outcome
Council dwellings – Classification error
During testing, an asset was identified which
was transferred from assets under
construction to council dwellings in the
unaudited accounts. However, it was noted
that work on this asset was not completed
until after 31 March 2026, therefore they
should have been in asset under construction
for 2025/26 accounts. 
The Council updated the accounts. Assets
under construction as at 31 March 2026
increased by £4.112 million, with a
corresponding decrease to council dwellings.
Depreciation has decreased by £0.206m, with
a corresponding debit entry to the capital
adjustment account. 
Location factor used in property
valuations and indexation
The council used the January 2026 BCIS
location factor of 0.94 instead of the March
2026 location factor of 0.93 in the valuation of
depreciated replacement cost (DRC assets)
and indexation of properties valued using the
DRC methodology. We confirmed that the
impact was not material for the indexation
process however noted that it could
potentially be material for the assets revalued
at 31 March 2026.
The Council has calculated that the impact of
using a location factor of 0.93 instead of 0.94
would be a decrease of £3.007m to other
land and buildings. This represents 0.2% of
the total property, plant and equipment value
of £1,421.3 million. The council does not
consider this to be material and has not
updated the accounts.  As the impact is
below the audit materiality levels, we have
accepted this assessment.
Going forward, the council should ensure that
the March location factor is used within the
indexation and valuation calculations for the
annual accounts.  Recommendation 1
Assets under construction – Classification
error
During testing, an asset was identified as
incorrectly being included in assets under
construction although the asset was
operational. 
The Council have updated the accounts
which has increased other land and buildings
by £2.137 million, with a corresponding
decrease to assets under construction.  
Short term investments – Classification
error
During testing, we identified that a fixed term
deposit of £5 million had been incorrectly
classified as a short-term investment instead
of long term. 
The Council updated the accounts. This
resulted in long-term investments increasing
by £5 million, with a corresponding decrease
to short term investments. 
Appendix 2
26

Page 27

Audit of the annual accounts | 12 
Significant findings and key audit matters Outcome
Heritage Asset – Trinity Mirror and Shards
The Council were unable to provide evidence
to confirm that a heritage asset with a value
of £0.127m was owned by North Ayrshire
Council. 
The value of the asset is not material
however the Council should continue their
work to confirm their ownership of the asset.
Recommendation 2
Source: Audit Scotland
Correspondence referred to the auditor by Audit
Scotland/Statutory objections to the accounts
22.  We received an objection to the accounts covering issues related to
the Largs Common Good Fund and Trust Funds. We met with the objector
and considered the issues and evidence provided. We are satisfied that
this did not identify any issues which had an impact on our opinion on the
financial statements. 
23.   Through consideration of the objection, it has been identified that the
council has not held an annual putting competition in Largs, to meet the
requirements of the Isabella McPhee Memorial Fund. 
24.  The council no longer operates the putting green directly. In March
2024, Cabinet approved the lease of Mackerston Putting Green and
associated kiosk for a period of five years on a full repairing and insuring
lease at a rent of £2,000 per annum. No proposals have been received
from any third parties, either members of the community or the lessee, to
hold a putting competition.
Qualitative aspects of accounting practices 
25.  ISA (UK) 260 also requires auditors to communicate their view about
qualitative aspects of the council’s accounting practices, including
accounting policies, accounting estimates, and disclosures in the financial
statements.
Accounting policies 
26.  The appropriateness of accounting policies adopted by the council
was assessed as part of the audit. These were considered to be
appropriate to the circumstances of the council, and there were no
significant departures from the accounting policies set out in the Code of
Practice on Local Authority Accounting in the United Kingdom (the Code). 
Accounting estimates 
27.  Accounting estimates are used in number of areas in the council’s
financial statements, including the valuation of land and buildings assets
and the valuation of the pension liability. Audit work considered the
process management of the council has in place around making
accounting estimates, including the assumptions and data used in making
Appendix 2
27

Page 28

Audit of the annual accounts | 13 
the estimates, and the use of any management experts. Audit work
concluded:  
• There were no issues with the selection or application of methods,
assumptions, and data used to make the accounting estimates, and
these were considered to be reasonable. 
• There was no evidence of management bias in making the
accounting estimates.
28.  Details of the audit work performed and the outcome of the work on
accounting estimates that gave rise to significant risks of material
misstatement are outlined in Exhibit 6.
Disclosures in the financial statements
29.  The adequacy of disclosures in the financial statements was assessed
as part of the audit. The quality of disclosures was adequate, with
additional levels of detail provided for disclosures around areas of greater
sensitivity, such as financial instruments and valuation of the pension
liability.
Group audit 
30.  The council is part of a group and prepares group financial
statements. The group is made up of nine components, including the
council which is the parent of the group. Group audit instructions were
issued to component auditors, where required, to outline the expectations
and requirements in performing the audit work for the purposes of the
group audit. The audit work performed on the group’s components is
summarised in Exhibit 3. 
Exhibit 3
Summary of audit work on the group’s components 
Group component 
Auditor and audit work
required
Summary of audit work
performed 
North Ayrshire Council  Audit Scotland
Fully scope audit of the
council’s annual accounts. 
See above; results of the
audit work are reported in this
Annual Audit Report.
Common Good Funds Audit Scotland
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified. 
Appendix 2
28

Page 29

Audit of the annual accounts | 14 
Group component 
Auditor and audit work
required
Summary of audit work
performed 
Trust Funds Audit Scotland
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
North Ayrshire 
Ventures Trust
Galbraith Pritchards
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
North Ayrshire 
Leisure Limited
Azets Audit Services
Limited
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
Strathclyde Partnership 
for Transport (SPT)
Audit Scotland
Obtain assurances on the
audit procedures carried out
on the valuation of land and
buildings in SPT
Assurances obtained on the
audit procedures carried out
on management override,
valuation of land and
buildings in SPT.
Strathclyde 
Concessionary 
Travel Scheme 
Joint Board
Audit Scotland
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
Ayrshire Valuation Joint
Board
Audit Scotland
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
North Ayrshire 
Integration Joint 
Board
Audit Scotland
Analytical procedures at
group level.
Analytical procedures
performed at the group level,
no significant issues
identified.
Source: Audit Scotland
31.  ISA (UK) 600 requires auditors to report the following matters if these
are identified or encountered during an audit:
• any instances where review of a component auditor’s work gave
rise to issues and how this was resolved.
• any limitations on the group audit. 
Appendix 2
29

Page 30

Audit of the annual accounts | 15 
• any frauds or suspected frauds involving group or component
management.
32.  No matters in relation to the above were identified. 
33.  The unaudited group accounts were prepared using the 2024/25
accounts for North Ayrshire Leisure Limited as the 2025/26 accounts are
not yet available. We are satisfied that this has not had a material impact
on the group accounts. 
Our audit opinion on the annual Accounts of the eight
section 106 charities administered by the council are
unmodified.
34.  Elected members of the council are trustees for eight registered
Scottish charities:
• Anderson Park Trust: Charity number – SC042136
• Douglas Sellers Trust: Charity number – SC042101
• Margaret Archibald Bequest: Charity number – SC042117
• North Ayrshire Charitable Trust: Charity number – SC025083
• North Ayrshire Council (Dalry) Charitable Trust: Charity number
– SC043644
• North Ayrshire Council (Kilbirnie and Glengarnock) Charitable
Trusts: Charity number – SC043600
• North Ayrshire Council (Kilwinning) Charitable Trust: Charity
number – SC043374
• North Ayrshire Council (Largs) Charitable trust: Charity number
– SC043494
35.  The Trust balances are disclosed in a note in the council’s Annual
Accounts but do not represent assets of the council so are not included
within the cash and cash equivalents figure shown in the council’s balance
sheet. 
36.  A full and separate independent auditor’s report is required for the
statement of accounts of each registered charity where members of North
Ayrshire Council are sole trustees, irrespective of the size of the charity;
this is as a result of the interaction of the Local Government in Scotland
Act 1972 with the charities legislation. 
37.  Our duties as auditors of the charities administered by North Ayrshire
Council are to: 
Appendix 2
30

Page 31

Audit of the annual accounts | 16 
• express an opinion on whether the charity’s financial statements
properly present the charity’s financial position and are prepared in
accordance with charities legislation. 
• read the Trustees’ Annual Report and express an opinion as to
whether it is consistent with the financial statements. 
• report on other matters, by exception, to the Trustees and to the
Office of the Scottish Charity Regulator (OSCR).
38.  The council has made full use of the connected charities provision and
reports all charities within one set of accounts.
39.  Six trusts have been dormant for a period of six years or more and of
these, three Trusts have been dormant for over eight years. The dormancy
of each identified Trust is disclosed on page 6 of the Trustees annual
report. 
40.  We recommended within the 2022/23 Annual Audit Report, that the
charitable Trusts had adequate governance documentation to enable
grants to be issued as well as suitably advertising their purpose and how
funds can be accessed. Whilst the charitable Trusts have continued to
promote their activities, and the council raise awareness within
communities of the financial support available from the Charitable Trusts;
this has not been sufficient to bring the trusts back into operation. There is
no clear plan on how to bring these Trusts back in to use. It is therefore
unlikely that these Trusts meet the requirement of public benefit. 
41.  We reported in 2024/25 that; the funds within Dalry Trust, Kilwinning
Trust, Kilbirnie & Glengarnock Trust, Largs Trust, Douglas Sellers Trust
and Anderson Park Trust will be exhausted during 2025/26. The trustees
planned to obtain approval from OSCR to wind up these trusts and for any
remaining capital funds to be disbursed.  The funds were not exhausted in
2025/26 and officers confirmed that approval has not been sought from
OSCR to wind them up.
42.  The Independent Auditor’s Report for the Annual Accounts of the eight
charities administered by the council reports that, in the appointed
auditor’s opinion, these were free from material misstatement. 
Recommendation 5
Dormant Trusts
The council should look to progress plans to utilise trust funds to deliver
public benefit and where appropriate to seek approval from OSCR for
the disbursement of any remaining capital and wind up those Trusts.
Appendix 2
31

Page 32

Audit of the annual accounts | 17 
Other matters to report 
43.  Auditing standards require auditors to report a number of other matters
if they are identified or encountered during an audit. The matter(s)
identified or encountered on the audit of the council is outlined in Exhibit 4.
Exhibit 4
Other matters to report 
Auditing standard
requirement  Matter to report Outcome
Related parties
ISA (UK) 550 requires
auditors to report any
significant matters in
connection with related
parties identified during the
audit. 
Our work identified a number
of register of interests for
councillors that had not been
updated for the 2025/26
financial year. 
This can lead to difficulties
identifying related party
relationships and issues
around transparency.
See para 141 and
Recommendation 1
Recommendation included in
this annual audit report.
Source: Audit Scotland
Significant matters discussed with management
44.  All significant matters identified during the audit and discussed with the
council’s management have been reported in the Annual Audit Report.
Audit adjustments
45.  Audit adjustments were required to the financial statements to correct
misstatements that were identified from the audit. Details of all audit
adjustments greater than the reporting threshold of £0.700 million are
outlined in Exhibit 5, 
Appendix 2
32

Page 33

Audit of the annual accounts | 18 
Exhibit 5
Audit adjustments 
Details
Financial
statements lines
impacted
Comprehensive
Income and
Expenditure Statement
(CIES) Balance Sheet
Audit adjustments to financial
statements Dr Cr Dr Cr 
£000 £000 £000 £000
1. As outlined in Exhibit 2, an
adjustment was required due to
significant finding one.     
Assets under
Construction    4,112 
Council Dwellings      (4,112) 
Capital adjustment
account   206 
Depreciation  (206)  
2. As outlined in Exhibit 2, an
adjustment was required due to
significant finding three.     
Other Land and
Buildings   2,137 
Assets under
Construction    (2,137)
3. As outlined in Exhibit 2, an
adjustment was required due to
significant finding four.     
Long term
investments   5,000 
Short term
investments    (5,000)
Net impact on financial statements - (206) 11,455 (11,249)
Audit adjustments in disclosures    
Appendix 2
33

Page 34

Audit of the annual accounts | 19 
Source: Audit Scotland
46.  Management of the council processed audit adjustments for all
misstatements identified greater than the reporting threshold. As a result,
there are no uncorrected misstatement to report
47.  In addition to the corrected misstatements outlined in Exhibit 5, there
were other misstatements identified greater than the reporting threshold.
The value, nature, and circumstances of the uncorrected misstatements
were considered, individually and in aggregate, by the audit team, and it
was concluded these were not material to the financial statements. As a
result, these did not have any impact on the audit opinions given in the
Independent Auditor’s Report.
48.  It is the auditor’s responsibility to request that all misstatements
greater than the reporting threshold are corrected, even if they are not
material. Management of the council have not processed any audit
adjustments to correct these misstatements. However, the final decision
on whether an audit adjustment is processed to correct a misstatement
rests with the Audit and Scrutiny Committee as those charged with
governance. 
Whole of Government Accounts (WGA) return 
49.  The council is part of the WGA boundary and therefore prepares a
return that is used by HM Treasury to prepare the WGA. The National
Audit Office (NAO) is the auditor for the WGA and issues instructions
outlining audit procedures auditors must follow when auditing a WGA
return. The threshold for requiring audit procedures to be performed on the
WGA return was set at £2 billion. The council was below this threshold and
therefore only limited audit procedures were required.
Significant risks of material misstatement identified in the
Annual Audit Plan
50.  Audit work has been performed in response to the significant risks of
material misstatement identified in the Annual Audit Plan. The outcome of
audit work performed is summarised in Exhibit 6, 
Appendix 2
34

Page 35

Audit of the annual accounts | 20 
Exhibit 6 
Significant risks of material misstatement to the financial statements 
Risk of material
misstatement Planned audit response Outcome of audit work
Fraud caused by
management override of
controls 
Management is in a unique
position to perpetrate fraud
because of management’s
ability to override controls
that otherwise appear to be
operating effectively.
The audit team will:
• Evaluate the design and
implementation of controls
over journal entry
processing.
• Make inquiries of
individuals involved in the
financial reporting process
about inappropriate or
unusual activity relating to
the processing of journal
entries.
• Test journals entries,
focusing on those that are
assessed as higher risk,
such as those affecting
revenue and expenditure
recognition around the
year-end. 
• Evaluate significant
transactions outside the
normal course of business.
• Assess the adequacy of
controls in place for
identifying and disclosing
related party relationships
and transactions in the
financial statements. 
• Assess changes to the
methods and underlying
assumptions used to
prepare accounting
estimates and assess
these for evidence of
management bias.
Audit work performed found:
• The design and
implementation of controls
over journal processing
were appropriate. 
• No inappropriate or
unusual activity relating to
the processing of journal
entries was identified from
discussions with
individuals involved in
financial reporting. 
• No significant issues were
identified from testing of
journal entries. 
• No significant issues were
identified from transactions
outside the normal course
of business. 
• Our audit work identified
an issue with the controls
in place for identifying and
disclosing related party
relationships. 
• No significant issues were
identified with changes to
methods and underlying
assumptions used to
prepare accounting
estimates and there was
no evidence of
management bias. 
Conclusion: no evidence of
fraud caused by
management override of
controls. 
Appendix 2
35

Page 36

Audit of the annual accounts | 21 
Risk of material
misstatement Planned audit response Outcome of audit work
Non-Current Assets
The council held £1,259
million of property, plant, and
equipment (PPE) at 31 March
2025, of which £989.7 million
was land and building assets. 
The council is required to
value land and building
assets at existing use value
where an active market exists
for these assets. Where there
is no active market, these
assets are valued on a
depreciated cost replacement
(DRC) basis. As a result,
there is a significant degree
of subjectivity in these
valuations which are based
on specialist assumptions,
and changes in the
assumptions can result in
material changes to
valuations.
A number of errors were
identified in the prior year
relating to the classification of
non-current assets, which
resulted in a number of
significant adjustments being
required in the audited
accounts.
The audit team will: 
• Evaluate the design and
implementation of controls
over the valuation process. 
• Review the information
provided to the valuer and
assess this for
completeness and
accuracy.
• Evaluate the competence,
capabilities, and objectivity
of the valuer.
• Obtain an understanding
of management’s
involvement in the
valuation process to
assess if appropriate
oversight has occurred.
• Review the
appropriateness of the key
data and assumptions
used in the 2025/26
valuation process, and
challenge these where
required.
• Review the indices applied
by management to assets
not subject to valuation in
2025/26 and assess if
these are reasonable and
have been correctly
applied. 
• Perform substantive
testing of a sample of
assets from the asset
register to check that they
have been correctly
classified and have not
been counted in more than
one asset category.
• Review the NCA
disclosures in the
accounts.
Audit work performed found:
• The design and
implementation of controls
over the valuation process
were appropriate. 
• The information provided
to the valuer was accurate
and complete. 
• The valuer had sufficient
competence, capability,
and objectivity to perform
their work. 
• Management is involved in
the valuation process and
have an appropriate level
of oversight. 
• The data and assumptions
used in the 2025/26
valuation process were
appropriate. 
• The indices applied by
management to assets not
subject to valuation in
2025/26 were reasonable
and no significant issues
were identified regarding
their application. 
• Substantive testing of a
sample of assets did not
highlight any issues with
assets being counted in
more than one asset
category; however, a
couple of classification
errors were identified.
• The NCA disclosures in
the accounts were deemed
appropriate. 
Conclusion: the valuation of
PPE is not materially
misstated.
Appendix 2
36

Page 37

Audit of the annual accounts | 22 
Source: Audit Scotland
Prior year recommendations 
51.  The council has made progress in implementing the agreed prior year
audit recommendations. For actions not yet implemented, revised
responses and timescales have been agreed with the council and are
outlined in Appendix 1.
Appendix 2
37

Page 38

Wider scope audit | 23 
Wider scope audit 
Conclusion
The council has effective and appropriate arrangements in place for
Financial Management; Financial Sustainability; Vision, Leadership and
Governance; and Use of Resources to Improve Outcomes. 
Financial management is effective. The council reported an underspend
against the general services budget of £21.4 million following
underspends in capital finance costs, employee costs and increased
income across services. Usable reserves increased by £17.2 million to
£147.1 million at 31 March 2026. Of this £49.6 million is earmarked for
the Prudential Investment Fund which will support borrowing costs for
the Capital Investment Programme.
The Medium-Term Financial Outlook was updated in November 2025
whilst the Medium-Term Financial Plan (MTFP) 2026/27 to 2028/29 was
approved in February 2026. The MTFP 2026/27 to 2028/29 showed a
cumulative gap of £61.6 million over the three-year period. The council
approved a balanced budget for 2026/27. This included a savings
package of £7.3 million, increasing council tax by 8.5% and the planned
utilisation of £3.5 million of reserves.
Governance arrangements in place are effective however improvements
could be made regarding the timely completion of elected members
registers of interest as well as increased levels of attendance at member
training events.
Performance reporting arrangements are well established. National
benchmarking data shows the council’s performance has improved over
time, but performance is mixed when compared to the prior year with
50% of indicators improving whilst performance declined for 27%.
Audit approach to wider scope
Wider scope
52.  As reported in the Annual Audit Plan, the wider scope audit areas are: 
• Financial Management.
• Financial Sustainability.
Appendix 2
38

Page 39

Wider scope audit | 24 
• Vision, Leadership and Governance.
• Use of Resources to Improve Outcomes. 
53.  Audit work is performed on these four areas and a conclusion on the
effectiveness and appropriateness of arrangements the council has in
place for each of these is reported in this chapter. 
Conclusions on wider scope audit
Financial Management 
54.  The audit work performed on the arrangements the council has in
place for securing sound financial management found that these were
effective and appropriate. This judgement is evidenced by the council: 
• having a system of internal control in place that is operating
effectively and has no significant weaknesses or deficiencies. 
• having clear and up-to-date policies and procedures, for example,
financial regulations and scheme of delegation, in place that ensure
effective financial management. 
• having clear and up-to-date policies in place for preventing and
detecting fraud and other irregularities, and participation in fraud
prevention and detection activities such as the National Fraud
Initiative (NFI). 
• having suitably qualified and experienced staff leading the finance
function, which has sufficient skills, capacity, and capability to
effectively fulfil its role. 
• having effective arrangements in place for the scrutiny of
arrangements that support sound financial management, and
effective scrutiny and challenge provided by the Audit and Scrutiny
Committee. 
The council reported a general fund service underspend of
£21.4 million.
55.  The council approved a balanced budget of £459 million for 2025/26 in
February 2025. The budget required a planned use of £4 million reserves
and a range of savings totalling £4.801 million. In addition, earmarked
funds of £85 million were carried forward from 2024/25 for service
expenditure in 2025/26 and are reflected in the financial performance
reports for 2025/26. 
56.  In the 2025/26 Annual Accounts, the council reported a total service
underspend of £21.4 million. Significant variances against budget are
summarised in Exhibit 7.
Appendix 2
39

Page 40

Wider scope audit | 25 
Exhibit 7
Summary of significant variances against budget
Area £m Reason for variance 
Financing costs  £10.2 
million
Underspend on capital financing costs
aligned to Treasury management and
investment strategy, including revision to
the annual debt repayment charges
under revised service concession
arrangements. 
Employee costs
£2.2
million
Underspend in employee costs mostly
due to vacancy management across
services and staff turnover levels. This is
net of the overspend of £1.7 million
additional cots for teachers in relation to
absence cover and teacher salary pay
levels. 
Service income and
recharges
£4
million
Higher than anticipated income and
recharges across services. 
Other Corporate
items
£3.4 
million
Underspend in relation to centrally held
provisions not required in the year. 
HSCP
£1.8
million
Underspend within HSCP net of £1.3
million additional costs for external
residential and non-residential
placements for children. 
Source: North Ayrshire Council 2025/26 Annual Accounts
The Housing Revenue Account underspent by £3.9 million
in 2025/26
57.  The Housing Revenue Account expenditure of £62.5 million was
against a revised budget of £66 million. The underspend of £3.9 million
reported is mostly due to savings on loan charges linked to the council’s
continuing strategy to delay external borrowing by utilising cash balances. 
58.  The council intends to retain the underspend within the Housing
revenue Account reserves to support future service delivery, including the
Council House building programme.
59.  The Housing Revenue Account Reserve as at 31 March 2026 is £25
million and will be utilised to support the delivery of the HRA Business
Plan. 
60.  Housing Revenue Account expenditure on capital investment was
£36.917 million against a budget of £41.958 million. The underspend was
Appendix 2
40

Page 41

Wider scope audit | 26 
primarily in relation to changes in the profiling of expenditure on new build
projects including contingency budget not required in year.
There was a £17.2 million increase in usable reserves to
£147.1 million at 31 March 2026.
61.  There is a planned use of reserves over the medium term to mitigate
funding gaps. In 2025/26 there was a net increase of £17.2 million
(2024/25 £3.5 million), in the council’s usable reserves, resulting in a total
balance of £147.1 million at 31 March 2026 (Exhibit 8).
62.  The March 2023 CIPFA Bulletin 13 on Local Authority Reserves and
Balances provides updated best practice guidance on Local Authority
Reserves and Balances. The Bulletin does not set a prescribed level of
reserves, but it says the Proper Officer (the council’s Head of Service -
Finance) has a responsibility to advise members on the creation and
levels of reserves that are appropriate to the council’s circumstances.
Reserves balances can be held for three main purposes:
• Working balance: To help cushion the impact of uneven cash flows
and avoid unnecessary temporary borrowing. 
• Contingency: To cushion the impact of unexpected events or
emergencies. 
• Known requirements: To build up funds to meet known or predicted
requirements
Exhibit 8
North Ayrshire Council – Usable reserves 
Reserve
31 March 2024
£’Million
31 March 2025
£’Million
31 March 2026
£’Million
General fund £93.385 £94.269 £107.745
Housing Revenue
Account £20.566 £22.141 £25.148
Insurance Fund £2.558 £2.233 £2.316
Capital Fund £9.831 £11.186 £11.866
Total usable
Reserves £126.340 £129.829 £147.075
Source: North Ayrshire Council Annual Accounts 2024/25 to 2025/26
Appendix 2
41

Page 42

Wider scope audit | 27 
63.  At 31 March 2026, the general fund reserve includes an unearmarked
balance of £11.195 million, representing 2.3% of budgeted expenditure for
2025/26. Management considers that this level of reserve reflects a
suitable contingency to contribute towards any unanticipated pressures
and is consistent with, although at the lower end of, the council’s approved
strategy of maintaining unearmarked reserves between 2 and 4 per cent of
net expenditure to meet the potential cost of unforeseen liabilities. 
64.   The earmarked general fund reserve of £96.6 million includes an
earmarked Prudential Investment Fund (Loans Fund Reserve) of £49.6
million which supports borrowing linked to the council’s Capital Investment
Programme. It was created as part of the 2015/16 budget strategy to
utilise short term underspends on General Fund financing budgets to
offset longer term pressures to support Prudential Borrowing arising from
the Capital Investment Programme.
65.  Due to the significant investment planned by the council over the
period to 2033/34, the current General Fund financing budgets will be
incrementally increased over the period of the programme. This additional
funding includes the use of the recurring element of the Service
Concession flexibility approved at Council on 15 February 2023 and the
utilisation of the balance of savings from the reduction in employer
pension contributions in 2025/26.
66.  The remainder of the General Fund Reserve, £47 million, is
earmarked for specific purposes such as the supporting the council’s
renewal and recovery strategy (£4.1 million), change and service redesign
fund (£3.3 million) and supporting the medium-term financial planning
strategy (£5.2 million).
67.  The level of reserves has supported the council in delivering medium-
to long-term strategies, funding one-off costs, and smoothing its core
revenue budget requirement. However, delivering balanced budgets over
the medium term will remain very challenging and will require a range of
measures, including reduced service investment, further service reform
and redesign, income generation, efficiencies from the Sustainable
Change Programme, use of council reserves, and council tax increases
that balance inflationary pressures with the impact on citizens.
A new General Fund Capital Investment Programme
2025/26 to 2033/34 is used to inform capital investment and
support Council plan priorities.
68.  In February 2025, the Council approved the refreshed Capital
Investment Programme 2025/26 to 2033/34. The refresh considered the
current Capital Investment Programme and takes cognisance of
subsequent changes including: 
Appendix 2
42

Page 43

Wider scope audit | 28 
• The ongoing impact of construction industry inflation, cost volatility
and supply chain issues across the overall Capital Investment
Programme; 
• Revised Scottish Government capital grants as detailed in the Local
Government Finance Settlement 2025/26; 
• A review of spending profiles across key capital projects to support
the Council’s priorities; and 
• Revised levels of investment across projects, taking cognisance of
Council priorities, external funding sources and investing in core
assets through asset management plans.
69.  The refresh included an assessment of all funding sources over the 9
years of the plan, including assumed levels of general capital grant,
specific grants and an assessment of the level of capital receipts over the
period. The refreshed capital Investment Programme proposed total
investment of £331.5 million over the period 2025/26 to 2033/34. Total
available funding is projected at £174.2 million.
70.  The difference between the Council's Capital Investment Programme
and funding from various sources is expected to be met through prudential
borrowing of £157.260m. The Capital Investment Programme is expected
to be delivered within the approved loan charges revenue budget, utilising
the balances held in the Prudential Investment Fund and Capital Fund to
smooth the revenue implications of the borrowing costs associated with
the revised programme.
71.  The Prudential Investment Fund was created as part of the 2015/16
budget strategy to utilise short term underspends on General Fund
financing budgets to offset longer term pressures to support Prudential
Borrowing arising from the Capital Investment Programme.
72.  Due to the significant investment planned by North Ayrshire Council
over the period to 2033/34, set within the context of government grant
forecasts and combined with the additional cost pressures identified
across a number of projects, it is projected that these funds will be
exhausted before the end of the current 10-year Capital Investment
Programme.
73.  The council acknowledges that in order to ensure the affordability of
current and future capital investments beyond this, it will be necessary to
incrementally increase the current General Fund financing budgets over
the period of the programme. Additional funding support to mitigate
significant cost increases and the increased cost of borrowing includes the
use of the recurring element of the Service Concession flexibility, which
resulted in an average contribution of £3.437m from 2022/23 and the
utilisation of the balance of savings from the temporary reduction in the
employers’ superannuation contributions during 2024/25 and 2025/26
totalling £8.498m.
Appendix 2
43

Page 44

Wider scope audit | 29 
74.  The proposed investment aligns with the Council's key priorities, as
set out in the Council Plan 2023-2028, core asset management plans and
the refreshed Capital Investment Strategy.
75.  In response to previous reporting on the need for the council to
improve its forecasting of capital projects and more accurately plan
expenditure, recognising the extent of optimism bias that appears to have
existed; the phasing of expenditure within the approved Capital Investment
Programme for 2024/25 to 2033/34 was reviewed to reflect historic
expenditure patterns and organisational capacity. This resulted in the
rephasing of approximately 19% of the planned expenditure in both
2024/25 and 2025/26 for delivery in later years, without impacting on the
overall value of investment within the programme. 
76.  Both capital and revenue financial resources across the General Fund
and Housing Revenue Account are used to maintain the current asset
base. The Council’s Capital Investment Strategy has been developed in
line with the requirements of the Prudential Code and brings together the
various asset management plans and strategies across the Council,
aligning investment plans with these strategies and with strategic priorities.
Individual asset management plans are then updated on an annual basis.
77.  The capital programme is reviewed by Cabinet on an on-going basis
with any additional funding brought forward for approval as appropriate.
Major reviews are undertaken on a 3-year basis, with the next due to be
completed during 2026/27.
Challenges in the construction industry continue to impact
the council’s capital programme.
78.  The Capital Investment programme recognises risks around significant
cost volatility across the construction industry, including inflationary
pressures, limited availability of contractors, supply chain issues and
material shortages which are impacting on tender returns and the cost of
materials. 
79.  Where quantified, the resultant cost pressures have been recognised
in relation to specific projects. However, risks have been identified, or are
anticipated, across a number of projects using industry cost estimates as
an indicator, including major works at Ardrossan North Shore through
enabling works and Ardrossan Campus. In order to support the
management of these and other emerging risks, and to apply prudent
financial planning, an additional investment of £15.000m within the
Flexibility budget is included over the next five years. This position will
continue to be monitored as works advance and tenders are finalised.
80.  Total capital investment of £331.5 million from the Council’s General
Fund is planned over the period from 2025 to 2026 until 2033 to 2034,
supporting the four key strategic priorities from the Council Plan:
Appendix 2
44

Page 45

Wider scope audit | 30 
• Wellbeing, 
• Communities and Local Democracy, 
• Climate Change and 
• A Sustainable Council.
81.  Including planned expenditure of £63.8 million towards the Ayrshire
Growth Deal to 2033 to 2034. It is recognised that the total level of
investment across Ayrshire will be in the region of £251.5 million (including
£103 million commitments from both the UK and Scottish Governments).
82.  The council’s General Fund capital plan includes £96.0 million planned
investment in Education. The major areas of education investment include:
• £6.5 million investment for the universal school meals expansion to
enable improvements in current kitchen and dining facilities across
the school estate to create capacity for the anticipated uptake. 
• £81.8 million for the new build Ardrossan Campus wider community
facility development. 
• £7.5 million investment to schools for ICT equipment.
83.  In June 2026, Cabinet received a report from the cost consultant on
the Ardrossan Campus Project. This was after the identification in
September 2025 of asbestos and hydrocarbon contamination which has
resulted in an additional cost to the project of £9.97 million (8.74%) and an
extension of the completion date to 26 May 2028. This has resulted in the
overall Campus project budget increasing to £124.6 million, with the
additional funding to be met from the Council’s capital flexibility fund
approved in February 2026.
84.  The council’s Housing Revenue Account Capital Investment
Programme for 2026/27 of £70.1 million, including £18.5 million for stock
improvements and £34.2 million to support the delivery of the Strategic
Housing Investment Plan, aims to deliver 1,666 affordable new homes.
Roads backlog maintenance stands at £42.9 million with a
‘steady state’ requirement for maintaining the roads at
present condition of £3.8 million per year.
85.  North Ayrshire Council’s roads are the council’s largest community
asset. The council maintains, 1,044 kilometres of adopted roads.
86.  The capital programme for the period 2026/27 to 2033/34 details that
£3.8m of capital investment is planned annually on roads
improvement/reconstruction. The Council Budget meeting in February
2026 approved a further £4 million investment in Roads. The programme
also states that there is Planned investment of £83.5 million on roads,
Appendix 2
45

Page 46

Wider scope audit | 31 
structure and lighting until 2033/34 including improvements to the roads
and street lighting network, upgrading of the B714, flood prevention works,
bridges infrastructure improvement and Active Travel projects.
87.  The £83.5 million includes £42.9 million road improvements, £4.1
million on flood prevention works and £26.2 million on the upgrading of the
B714 following a successful application to the UK Governments Levelling
Up Fund. Property lifecycle investment of £9.0 million, to support the
property asset management plan, will ensure Council properties continue
to be maintained to the appropriate standards in delivering services to
citizens and communities. The plan includes investment in several key
programmes of regeneration within North Ayrshire and, in respect of the
Ayrshire Growth Deal, on a wider pan Ayrshire basis.
Total external debt which includes the council’s long-term
liabilities was within the authorised limit and operational
boundary set by the council’s treasury management
investment strategy.
88.  The Capital Financing Requirement (CFR) is the underlying borrowing
requirements of the Council. The CFR is the total historic outstanding
capital expenditure which has not been paid from either a capital or
revenue resource and, therefore, needs to be funded from borrowing. It is
a measure of the Council’s underlying borrowing need.
89.  The council remained within its authorised CFR of £552.8 million for
2025/26, with gross borrowing of £421.9 million. This is lower than the
CFR as the council continues with its strategy to use internal funds. The
ratio of net revenue used for paying for the borrowing finance cost (loan
interest) was 26.5% for housing and 4.1% for non-housing. This is an
indicator of affordability and highlights the revenue implications of existing
and proposed capital expenditure by identifying the proportion of the
revenue budget required to meet borrowing costs.
90.  The treasury strategy aligns with the Council Plan by contributing to
“maximising financial flexibilities to help support delivery of priorities” and
“maximising value from the use of our assets” as referred to under the
priority of “A Sustainable Council”.
91.  The Capital Investment Strategy (2024-2034) and Treasury
Management and Investment Strategy (2026/27) show that the council
considers its debt to expenditure ratio and is keeping borrowing within
prudent and sustainable levels. The CFR is projected to:
• Increase to £874.978 million by 2030/31
• Reduce annually thereafter to 2033/34.
92.  The council continues to manage its borrowing through its treasury
management and investment strategy. Updates on the investment position
Appendix 2
46

Page 47

Wider scope audit | 32 
of the Council are reported to Cabinet in the Mid-Year Treasury Report,
and the Annual Treasury Report is submitted to the Council after the end
of the financial year.
The new Programme for Government in September
2026 focuses on improving outcomes and addressing
national challenges with wide ranging proposed reform 
93.  The Scottish Government’s Programme for Government 2026-31
focuses on eradicating child poverty, growing the economy, tackling the
climate emergency, and delivering a strong NHS and public
services.  Within health and social care, it prioritises reducing waiting
times, improving access to care, and shifting more services from hospitals
into community settings to support prevention and independent living.
94.  The Programme proposes modernisation and significant reform
including replacing the current 14 territorial health boards with two
strategic health boards.  For local authorities, the Programme signals
potential reform of health and social care governance and delivery
arrangements and reducing duplication and increasing efficiency in the
delivery of public services. While the direction of travel is towards greater
integration, prevention and community-based care, the full implications for
local authorities remain uncertain. Greater clarity is expected in the
coming months as the Scottish Government undertakes planned
consultation and engagement on the future of social care and local
governance. 
There are well-established budget monitoring and reporting
processes in place.
95.  The council has effective financial management processes in place to
manage budgets and support the sustainability of services in the medium-
term. This is supported by an experienced finance team and the processes
in place allow members to carry out effective scrutiny of the council’s
finances.
96.  The Cabinet regularly review progress against budget throughout the
year. The budget updates provide a good level of information on the
reasons for variances, the projected financial outturn and the challenges
facing the council for the rest of the year. The information is provided at
timely intervals throughout the year to enable effective scrutiny from
members.
Key financial information overtime shows how the council
has effectively managed its financial pressures overtime.
97.  Key financial information considered in forming the judgement on the
council’s arrangements for securing financial sustainability is outlined in
Exhibit 9.
Appendix 2
47

Page 48

Wider scope audit | 33 
Exhibit 9
Key financial information 
Budget setting
2023/24
(£m)
2024/25
(£m)
2025/26
(£m)
2026/27
Planned
(£m)
Budget gap  19.267 22.574 18.867 17.615
Planned to be met via:     
• Savings and flexibilities -12.448 -17.562 -8.539 -7.296
• Use of reserves -3.410 -5.000 -4.000 -3.500
• Additional council tax / funding -3.409 -0.012 -6.328 -6.819
Actual
Savings delivered -12.448 -17.562 -8.539 
Reserves 
Use of / (contribution to) reserves -3.410 -5.000 -4.000 -3.500
Total usable reserves carried forward  126.340 129.829 147.075 
General Fund:    
• Earmarked  84.940 85.088 96.550 
• Uncommitted  8.445 9.181 11.195 
Source: The council’s 2025/26 annual accounts and Council Revenue Plans
Financial systems of internal control were effective
98.  From our review of the design and implementation of systems of
internal control (including those relating to IT) relevant to our audit
approach, we have not identified any issues that represent a risk of
material misstatement for the 2025/26 Annual Accounts.
99.  The key controls within the council’s main financial systems were
assessed as being designed and implemented appropriately. As such, we
are satisfied that the risk of material misstatement to the Annual Accounts
is low.
Appendix 2
48

Page 49

Wider scope audit | 34 
Internal audit provided a reasonable level of assurance
over the council’s framework of governance, risk
management and control arrangements during 2025/26.
100.  Internal Audit provides an independent and objective opinion on the
Council’s risk management, governance and control environment by
evaluating its effectiveness.
101.  The Internal Audit Plan for 25/26 was approved by the Audit and
Scrutiny Committee in March 2025 and sets out the areas of work which
Internal Audit intends to cover during the year. A mid-year update to the
Internal Audit Plan was approved in November 2025. 
102.  The update to the plan is in line with Global Internal Audit Standards
(GIAS) which recognise that it is good practice to regularly review and
adjust the plan, as necessary, in response to changes in the organisation’s
business, risks, operations, programmes, systems and controls.
103.  Internal audit’s annual report, presented to the June 2026 Audit and
Scrutiny Committee, provided reasonable assurance on the adequacy and
effectiveness of the Council’s governance, risk management and control
arrangements.
104.  All audit reports finalised during 2025/26 were reported to meetings
of the Audit and Scrutiny Committee. The results of the audits that have
been completed and reported on, with respect to the 2025/26 audit plan,
provided mostly substantial and reasonable audit opinions reported upon.
105.  In accordance with the GIAS, the Internal Audit function is required to
undergo an External Quality Assessment (EQA) at least once every five
years. The most recent EQA was completed in 2022, and the next EQA
undertaken against the new Global Internal Audit Standards is scheduled
for 2027.
106.  A self-assessment against the Global Internal Audit Standards was
completed during 2025/26, and the Chief Internal Auditor concluded that
the internal audit function generally conforms with the Standards. An
associated action plan was developed and is expected to be implemented
over the next 12 months to support progression towards full conformance.
Progress against this action plan will be reported to the Audit & Scrutiny
Committee during 2026/27. The self-assessment forms part of the Quality
Assurance and Improvement Programme (QAIP), as required by the
Global Internal Audit Standards.
The council has in place appropriate arrangements for the
prevention and detection of fraud and corruption. 
107.  The council has a range of established procedures for preventing
and detecting fraud and irregularity including counter fraud and corruption
Appendix 2
49

Page 50

Wider scope audit | 35 
strategy, whistleblowing policy and procedures, and codes of conduct for
members and officers.
108.  A Corporate Fraud Team provides the Council with the capacity to
investigate fraud both within and against the organisation. The Audit and
Scrutiny Committee receives bi-annual updates on the work of the team. 
109.  The team received 338 referrals for investigation during 2025/26
(2024/25 331 referrals). All referrals made to the team are investigated.
318 cases were closed during 2025/26 (2024/25 359 cases) with results
achieved (fraud, error or other recovery/action) in 100 cases. Fraud and
error totalling £0.103 million was identified.
110.  The council continues to participate in the National Fraud Initiative
(NFI). This is a counter-fraud exercise across the UK public sector which
aims to prevent and detect fraud.
111.  We have concluded that the council has in place appropriate
arrangements for the prevention and detection of fraud and other
irregularities. We are not aware of any specific issues that we need to
bring to your attention.
Financial Sustainability 
112.  The audit work performed on the arrangements the council has in
place for securing financial sustainability found that these were effective
and appropriate. This judgement is evidenced by the council: 
• making appropriate arrangement to develop medium and longer-
term financial plans and linking these to its Corporate Plan and
priorities.
• having effective arrangements in place for identifying risks to
financial sustainability over the medium and longer-term, and
understanding medium and longer-term demand pressures that
could impact on available resources. 
• having savings plans in place to manage forecast budget deficits,
and a reserves strategy in place to manage the use of reserves if
the required level of savings cannot be met.
The council’s latest medium-term financial outlook which
covers the three-year period to 2026/27 to 2028/29 has
identified a structural funding gap of £61.6 million
(including the HSCP).
113.  The council has established processes for setting and monitoring
budgets. The General Fund Long Term Financial Outlook (LTFO) is a key
part of its strategic financial framework, providing the basis for the
Medium-Term Financial Outlook (MTFO) and annual budgets. This
supports the council in responding to financial challenges and aligning
Appendix 2
50

Page 51

Wider scope audit | 36 
resources with the priorities in the Council Plan. The LTFO also ensures
that strategic initiatives requiring long-term revenue and capital
commitments are reflected in financial planning.
114.  The latest LTFO, covering 2024/25 to 2033/34 and presented to the
Council in December 2023, identifies an estimated funding shortfall of
£127 million over the next ten years. This includes anticipated HSCP
pressures and is based on best estimates, with sensitivity analysis
showing the impact of changes in key assumptions. Although the council
currently has reserves to help manage funding gaps, these reserves can
only be used once. The council’s cost base is not sustainable, creating a
risk to the longer-term financial sustainability of council services.
115.  The most recent MTFO for the period 2026/27 to 2028/29 was
presented to the Council in November 2025. It draws on similar data and
projections to that contained in the Long-Term Financial Outlook; however,
the financial projections have been updated for this period based on more
recent cost analysis and funding metrics. This has identified a gross
funding gap of £61.6m over the next 3 years, excluding any assumptions
regarding planned use of reserves and Council tax increases, which must
be addressed as part of the Council’s Medium-Term Financial Plan.
116.  Key assumptions within the MTFO include:
• Workforce costs - The current planning assumption beyond that
which has already been agreed across the medium and long-term is
for the Council funding element of pay awards to remain at a 3%
increase each year. It was noted that for 2026/27, the Scottish
Government have committed to fund the increase in pay above 3%
i.e. 0.5% additional funding.
• HSCP - The projected position of HSCP, influenced by significant
demographic, demand, funding and inflationary pressures of around
£8.2m in 2026/27, indicates a potential funding deficit position of
between £8m to £21m in 2026/27, with a central planning deficit
assumption of between the best and medium-case scenarios of
around £11m.
• Local Government Funding – the council recognises the uncertainty
around future funding levels and how they can impede progress
towards delivering sustainable change. The Scottish Government
has made a commitment to include information to support multi-
year allocations; it is hoped that this new approach will support
more sustainable medium-term financial planning.
117.  The anticipated funding gap position of the Council (including the
HSCP) over the period is provided in Exhibit 10. This does not incorporate
any planned use of reserves noted above. 
Appendix 2
51

Page 52

Wider scope audit | 37 
Exhibit 10
MTFO – Budget gap 2026/27 to 2028/29 
2026/27
£m
2027/28
£m
2028/29
£m
Total gap
£m
General Fund
Funding Gap 12.5 13.8 13.0 39.3
HSCP Pressures
(including pay)
8.2 7 7.1 22.3
Total 20.7 20.8 20.1 61.6
Source: North Ayrshire Council
The council approved a balanced budget for 2026/27 with
council tax increasing by 8.5 per cent, fees and charges
increasing by 5 per cent on fees and the planned use of
£3.5 million of reserves was approved. 
118.  The Medium-Term Financial Plan (MTFP) for 2026/27 to 2028/29
was approved in February 2026. As reflected in Exhibit 10, it outlined
indicative net funding gaps for the three-year period to 2028/29 of £61.6
million which includes the Health and Social Care Partnership pressures. 
119.  The MTFP included an initial baseline planning assumption for
2026/27 of an increase of 7% Council Tax, with a current planning
assumption of a further 5% increase for 2027/28 and 2028/29. The council
approved an increase in council tax of 8.5% for 2026/27.
120.  The MTFP includes a range of savings proposals that will be required
to deliver a balanced Budget position for 2026/27. Alongside this council
tax is projected to increase by 7% and reserves will be utilised to help
mitigate the significant financial challenges facing the Council. 
121.  The council was presented with a balanced budget for 2026/27 in
February 2026 of £484.9 million. Council approved an increase to council
tax rates of 8.5% which will generate an additional £6.8 million. Alongside
this, the budget outlined plans for the use of £3.5 million in reserves and
savings will also be delivered across directorates.
122.  As part of efficiencies and savings proposals to support the budget,
the council also approved an increase of 5% on fees and charges for
2026/27. The budget also included a package of efficiency savings
totalling £7.296 million to address the council’s budget gap. This consists
of £4.202 million of savings within the council’s operational adjustment;
£2.220 million of previously approved savings and £0.874 million of IJB
related savings.  
Appendix 2
52

Page 53

Wider scope audit | 38 
123.  The council recognise risks to the achievement of the 2026/27
projected outturn position due to:
• the employer contribution rates to Strathclyde Pension Fund
increasing to 17.5% in 2026/27 following a two-year temporary
reduced rate of 6.5%
• ongoing pressures within the Health and Social Care Partnership
which has the potential to impact the level of support the council is
required to provide. The Heath and Social Care Partnership are
projecting a deficit position.
124.  The Medium-Term Financial Plan (MTFP) for 2026/27 to 2028/29
reflects on the analysis included within the Medium-Term Financial
Outlook. 
An extensive programme of engagement and consultation
with communities was undertaken as part of the 2026/27
budget process setting out the scale of the challenges
facing the council.
125.  Before the Council considered the range of budget proposals and the
level of Council tax for 2026/27, an extensive programme of engagement
and consultation with communities was undertaken that set out the scale
of the financial challenge facing the council. The engagement ran from 6
November to 19 December 2025 and included surveys across two main
themes as well as in person and online focus groups. The main themes
each included a number of proposals which included:
• Reduce the budget for teachers by 1% in 26/27 and 27/28 leading
to savings of £0.590 million and £1.549 million respectively.
• Align Pupil Support Assistant hours to reflect reduced pupil rolls
across mainstream schools, reducing the budget by 1% in each of
the two years equating to 135 hours per week.
• Streamline the Participatory Budgeting small community grants
processes into one community process, creating a more engaging
process for communities.
126.  The programme resulted in 1,225 responses across the two themes,
detailed feedback on proposals and considerable engagement with
community groups across North Ayrshire. The engagement also enabled
residents to bring petitions on specific options to the Audit and Scrutiny
Committee and Cabinet. Full details of feedback across all areas were
presented to the Council on 11 February 2026, for elected member
consideration in advance of setting the Council Budget on 25 February
2026.
Appendix 2
53

Page 54

Wider scope audit | 39 
127.  The use of the survey helps the Council fulfil its statutory duty to
consider the impact its policies, including budget proposals, may have on
those with protected characteristics (Equality Act 2010), our island
communities (Islands (Scotland) Act 2018) as well as the socio-economic
impact on our residents (Fairer Scotland Duty (2018), the Consumer
(Scotland) Act 2020) and the possible impact on the rights of children
(United Nations Convention on the Rights of the Child (Scotland) Act 2024. 
The results of the survey were used by services to help inform impact
assessments for budget proposals.
Vision, Leadership and Governance 
128.  The audit work performed on the arrangements the council has in
place around its Vision, Leadership and Governance found that these
were effective and appropriate. This judgement is evidenced by the
council:  
• having a Corporate Plan in place, supported by Operational Plans,
that clearly set out its vision, strategy, and priorities and reflect the
pace and depth of improvement required to realise these in a
sustainable manner. 
• involving service users, delivery partners, and other stakeholders in
the development of its vision, strategy, and priorities to ensure
these align to their needs. 
• having clear financial and performance reporting in place, both
internally and externally, that is linked to its Operational Plans, and
effective scrutiny and challenge of performance provided by Audit
and Scrutiny Committee.
• having effective governance arrangements in place in general, as
reflected in the Governance Statement included in the annual report
and accounts. 
There is openness and transparency in decision-making by
the council.
129.  The Council has established arrangements to support public access
to its decision-making processes, including the live streaming of
committee meetings and the publication of agendas, meeting papers, and
recordings on the Council website.
130.  North Ayrshire council publishes its Annual Accounts on its website,
which includes a Management Commentary. The commentary provides an
analysis of the council’s financial performance and use of resources for the
year. The Council has approved and adopted a Local Code of Corporate
Governance which is consistent with the principles of the CIPFA/SOLACE
Framework ‘Delivering Good Governance in Local Government’ (2016).
The Annual Governance Statement is approved annually by the Audit and
Scrutiny Committee and published on the council’s website.
Appendix 2
54

Page 55

Wider scope audit | 40 
131.  In addition, the council website provides access to a wide range of
corporate information, including information on the Council Plan,
organisational performance, and equality and diversity reporting.
There are appropriate governance and decision-making
arrangements in place at the council.
132.  Council members and management are responsible for ensuring that
effective governance arrangements are in place to support lawful and
proper decision-making, safeguard public funds, and promote
accountability. These arrangements also enable the council to monitor and
assess how efficiently and effectively it uses its resources.
133.  An annual review of governance arrangements is reported to the
Council. Following the last review in September 2024 the Scheme of
Delegation was reformatted to reflect the Council’s new directorate
structure.
The Council maintains Register of Interests for elected
members
134.  In accordance with the Councillor’s Code of Conduct, each member
is required to complete a register of interests. The register is intended to
be a public record of interests that might, by their nature, be likely to
conflict with a members’ role.
135.  Maintaining up-to-date registers is essential for public transparency
and helps ensure that the Council complies with the requirements of IAS
24 Related Party Disclosures, which require certain interests to be
explicitly disclosed in the annual accounts.
136.  The Council has processes in place for compiling the register of
interests’ information including sending out annual reminders to all
members to update their information. The audit team observed that
several follow-up reminders were sent out by officers during 2025/26.
However, some members have not completed their register of interests for
2026.
137.  Our audit work found that four members register of interests were not
updated during 2025/26 and two of these were last updated in 2022. 
138.  Members are required by the Ethical Standards in Public Life
(Scotland) Act 2000 (Register of Interests) Amendment (No. 2)
Regulations 2021 to update entries in the register of interests within one
month of circumstances changing. Maintaining up to date registers is
important for public transparency, and to ensure the Council meets the
accounting requirements of IAS 24 Related Party Disclosures which
requires certain interests to be disclosed explicitly within the annual
accounts.
Appendix 2
55

Page 56

Wider scope audit | 41 
Recommendation 3
Register of Interest
Elected members should complete and update their register of interests
at least annually, and within one month of any change in circumstances.
The council should put arrangements in place to monitor completion
rates and ensure the public register on the council website is updated
promptly. This will support transparency and help ensure related party
disclosures in the annual accounts are complete and accurate. 
The council offers a training programme for members in
addition to e-learning and the opportunity to attend
Improvement Service events and webinars.
139.  The Accounts Commission report on “Roles and Working
Relationships - Are you still getting it right?” emphasised that Councillors
need the skills and tools to carry out their role. This includes training in
relation to both Council and ALEO responsibilities, as well as scrutiny,
audit and financial decision making.
140.  A report on development support provided to members during the
period September 2025 to August 2026, included details of attendance
rates, feedback from current activities and future planned developments
was presented to the August 2026 Audit and Scrutiny Committee. The
report noted that the council offers a full training programme for members
in addition to e-learning and the opportunity to attend Improvement
Service events and webinars. Training covers a wide range of areas
including cyber security, safeguarding and councillor duties on outside
bodies.
141.  The report noted that elected members also have access to e-
learning modules on the iLearn system. It concludes that take up of this
learning is low. Overall, there were 137 (September 2024 to August 2025: 
155) separate Member attendances at development sessions between
September 2025 and August 2026. Members attendance ranged from 0 to
13, with approximately 40% of members not attending any training during
the period under review.
142.  Feedback is sought by electronic means on sessions attended and
for the period covered by the report, the response rate was 20%. As part
of planning for the 2027 elected member induction programme, a survey
was sent out to councillors to gather feedback on the effectiveness of the
2022 programme, only 5 responses were received.
Appendix 2
56

Page 57

Wider scope audit | 42 
We have previously reflected within the 2024/25 Annual Audit Report on
the levels of attendance at member training events. We note that the
council offers an extensive development programme for members that
are topical, relevant to the council and councillor’s responsibilities along
with areas of risk to the council. Members should engage with officers to
support the training programme through attendance at events, providing
feedback and suggesting future areas for development.
Recommendation 4
Members Development
Councillors should actively participate in the development sessions
made available to them to enhance their knowledge and understanding
of emerging issues, governance requirements, and best practices.
Attendance at these sessions will help ensure they remain informed of
relevant developments and are equipped to fulfil their roles and
responsibilities effectively.
Use of Resources to Improve Outcomes 
143.  The audit work performed on the arrangements the council has in
place around its Use of Resources to Improve Outcomes found that these
were effective and appropriate. This judgement is evidenced by the
council:
• being able to demonstrate a clear link between the use of resources
and delivery of its priorities. 
• having arrangements in place to benchmark its performance to
identify areas of improvement. 
• being able to demonstrate improvements in performance against
benchmarks and relative to other comparable organisations. 
There is regular reporting of the council’s progress with its
Council Plan priorities.
144.  The Cabinet is the main decision-making body of the council and as
part of its remit, it considers Council performance reporting. The most
recent meeting on 1 September 2026 considered the Council Plan year
end progress reporting.
145.  The Council Plan Progress Report Year End 2025 to 2026 shows
how the council is continuing to progress its priorities in line with Best
Value legislation in the six months ending 31st March 2026. It is supported
by the Local Government Benchmarking Framework Analysis of the April
2026 data release, to show the Council’s performance relative to others
and learn from other local authorities.
Appendix 2
57

Page 58

Wider scope audit | 43 
146.  There are 47 actions within the Our Council Plan, with one reported
directly through the Health and Social Care Partnership (HSCP) and
excluded from the report. Of the remaining 46 actions, 45 are on target
(green) and one is slightly adrift of target as at Year End. 
147.  A recommendation was included in the Annual Audit Report for
2024/25 that ‘the council needs to set out in advance what criteria have to
be met for an ‘on target’ judgement to be made for each action in the
Council Plan’. The Performance Management Strategy (2023-2028
October 2025 Refresh) details how to determine whether an action is on
target. This is being used within training to embed a structured approach
to performance management across the council at strategic and
operational levels.
148.  The report shows the progress on the 26 Performance Indicators
within the Council framework. At the year-end, 17 were on target,4 slightly
adrift, 4 significantly adrift and 1 with a data only/ status unknown status;
this is where a target has intentionally not been set, usually due to the
indicator being a new indicator or where the Council can only partly
contribute to the outcome. Details of those indicators adrift of target are
include in the report. 
Appendix 2
58

Page 59

Best Value audit | 44 
Best Value audit 
Conclusion
The council has effective and appropriate arrangements in place for
securing Best Value. 
The Management Report on themes prescribed by the Accounts
Commission reported the council has a clear asset management
strategy in place which is supported by effective governance and
accountability arrangements. 
The council has effective and appropriate arrangements in place for
preparing and publishing statutory performance.   
Audit approach to Best Value
149.  Under the Code of Audit Practice, the audit of Best Value in councils
is fully integrated within the annual audit. As part of the annual audit,
auditors are required to take a risk-based approach to assessing and
reporting on whether the council has made proper arrangements for
securing Best Value in accordance with statutory guidance, including
follow up of findings previously reported in relation to Best Value.
150.  The Accounts Commission also reports nationally on thematic
aspects of councils’ approaches to, and performance in, meeting their Best
Value duties. As part of the annual audit, thematic reviews, as directed by
the Accounts Commission, are conducted on the council. The thematic
review for 2025/26 was asset management and involved considering how
councils are managing their assets to ensure high-quality services while
also responding to challenges around financial sustainability and climate
change. Conclusions and judgements on the thematic review are reported
in a separate Management Report and summarised in this chapter.
Conclusions on Best Value
The council’s arrangements and performance in meeting Best
Value and community planning duties 
151.  The audit work performed on the arrangements the council has in
place for securing Best Value and its community planning arrangements
found these were effective and appropriate. This judgement is evidenced
by:
Appendix 2
59

Page 60

Best Value audit | 45 
• the council having well established and effective governance
arrangements in place, with Best Value being a key aspect of the
governance arrangements.
• the arrangements the council has in place around the four wider
scope audit areas, which are effective and appropriate, contribute to
it being able to secure Best Value. 
The council’s arrangements and performance in meeting Best
Value and community planning duties 
152.  The council is part of the fourth year of the programme for Controller
of Audit reports to the Accounts Commission on the council’s performance
in meeting its Best Value duties. The Controller of Audit report is available
on the Audit Scotland website, with a summary of the conclusions and
judgements made in the report outlined below.
• The Accounts Commission were impressed by the council’s
commitment to securing Best Value, which is clearly at the heart of
how it goes about its business. Communities across North Ayrshire
should be reassured about how the council plans and manages its
finances, and the way in which it is proactively working to address
structural budget gaps and contextual challenges, including
deprivation and a declining population. The council is self-aware,
actively identifies areas for improvement, keen to learn from others’
experience, and committed to improving outcomes and reducing
inequalities. 
• Working with partners across and out-with the region, the council is
demonstrating a real willingness to ‘think big’ and a commitment to
sustainable change. While cost saving is a primary driver for its
transformation programme, there is strong evidence that it wants to
do things differently to improve outcomes and gain wider benefits.
Examples like the Solar PV Farms project demonstrate innovation
and a desire to impact positively on net zero and fuel poverty
targets, even if financial savings are limited. 
• The council is an exemplar of how to do transformation well –
robust governance, a dedicated investment fund, a well-established
and well-resourced in-house team, a track record of delivering
savings, and evidence of active collaboration on shared services
with the other Ayrshire councils, who face similar challenges. We
would urge senior officers and elected members to now confidently
push on with this work despite political and structural complexities,
ensuring that financial benefits can be realised in the medium term
and wider benefits delivered in the longer term, including in relation
to economic growth. We expect other councils facing similar
challenges to look at what North Ayrshire is doing and how it is
doing it in relation to transformation and change. 
Appendix 2
60

Page 61

Best Value audit | 46 
• Recognised as a sector leader back in 2020, we are impressed that
a considered and embedded approach to community engagement
and empowerment continues, including successful implementation
of participatory budgeting, engagement with young people, long-
standing policies on asset transfer, and a new approach to budget
consultation which has succeeded in attracting significant input from
residents. It is evident that the council has good relationships with
its communities and that trust is there, providing strong foundations
when politics and decisions get difficult. We would encourage the
council to continue to evidence that it is listening to its communities
and acting on the results of engagement. 
• Like other councils, North Ayrshire faces significant medium-term
financial risks, particularly in relation to spending on health and
social care. We are encouraged that relationships across the
Integration Joint Board (IJB) are positive, and oversight and scrutiny
arrangements are robust. These factors will be critical if the
necessary savings and recovery actions are to be delivered over
the next few years. We also note that the council has used and still
plans to use reserves to close funding gaps but has acknowledged
that this is not sustainable. We look forward to following progress
on how savings are being delivered in future annual audit reports
and seeing progress on plans to achieve a sustainable cost base.
153.  The point to take forward from the report was around Evidence of
ongoing community engagement influencing decision making. There is a
range of community engagement activity undertaken across the Council.
Details of community engagement are included as part of the Council's
performance monitoring arrangements and they include community
engagement to support the development of Climate action plans, budget
engagement activity, third sector engagement event.
Themes prescribed by the Accounts Commission
154.  As previously outlined, the Accounts Commission reports nationally
on thematic aspects of council’s approaches to, and performance in,
meeting their Best Value duties, with the thematic review for 2025/26 on
the subject of asset management. Conclusions and judgements on the
council’s approach to asset management are outlined in a separate
Management Report which is available on the Audit Scotland website. A
summary of the conclusions and judgments made in the report is outlined
below. 
• North Ayrshire Council has an up-to-date and well-informed asset
management strategy that clearly sets out its approach and
priorities for managing and developing its assets. It covers a
sufficient period enabling strategic planning and is clear about how
progress will be monitored and when priorities will be reviewed. 
• The council’s Corporate Asset Strategy and Plans align with its
corporate objectives, new ways of working, the changing needs of
Appendix 2
61

Page 62

Best Value audit | 47 
its population, and clearly sets out how net zero commitments will
be met.
• North Ayrshire Council, alongside other local authorities, is
navigating substantial fiscal pressures that are projected to widen
budget gaps in the coming years. However, the Council
demonstrates a commitment to assessing affordability whilst
navigating substantial financial pressures that are projected to
widen budget gaps in the coming years.
• The Council is progressing well with the delivery of its capital
programme and asset management plans. North Ayrshire Council’s
performance against the relevant LGBF asset management
indicators has varied over time. The most recent data shows that
the council is currently performing above the national average and
is ranked within the top quartile nationally for these indicators.
• North Ayrshire Council’s performance against the relevant LGBF
asset management indicators has varied over time. The most
recent data shows that the council is currently performing above the
national average and is ranked within the top quartile nationally for
these indicators.
155.  We did not identify any improvement actions required by the council
from, our work and the report was presented to the August 2026 Audit and
Scrutiny Committee.
Statutory performance information (SPI) and service
performance 
156.  The Accounts Commission has issued a Statutory Performance
Information Direction which requires the council to publish information that
will:
• enable comparisons of performance between councils and over
time
• show how well it is improving local outcomes with community
planning partners in their area. 
157.  Auditors have a statutory duty to satisfy themselves that the council
has made proper arrangements for preparing and publishing SPI in
accordance with the Direction and report a conclusion in the Annual Audit
Report. 
158.  The arrangements the council has in place for preparing and
publishing SPI were assessed by considering:
• whether information reported allowed comparison of performance
between councils and over time 
Appendix 2
62

Page 63

Best Value audit | 48 
• the indicators it uses for reporting and whether it maximises use of
the Local Government Benchmarking Framework (LGBF) indicators
(and explaining the rationale when the LGBF is not used)
• whether information reported was balanced, timely, and accessible 
• whether information reported covered the four key areas set out in
the Schedule to the Direction. 
159.   The Council has appropriate arrangements in place for preparing
and publishing performance information. North Ayrshire Council has an
established process for reporting on the performance indicators within its
framework. With mid-year and year-end reporting to Cabinet.
160.  North Ayrshire Council also publishes performance information
through an online interactive Power BI performance dashboard as well as
the use of ‘magazine’ style reports that provide information on
performance across services on the Council website. 
161.  The performance dashboard also links to the LGBF benchmarking
tool and the Council aligns its performance indicators with the LGBF to
enable comparison of performance with other local authorities across
Scotland.
The council’s performance from national benchmarking data
shows improvement over time but performance is mixed when
compared to the prior year with 50% of indicators improving
whilst performance declined for 27% 
162.  The Local Government Benchmarking Framework (LGBF) brings
together a wide range of information about how all Scottish councils
perform in delivering services, including the cost of services and how
satisfied citizens are with them. 
163.  The Council Plan year-end progress reporting taken to the 1
September North Ayrshire Council includes data on the Local Government
Benchmarking Framework provides a clear summary of North Ayrshire’s
performance. 
164.  For the reportable indicators 51% were recorded within the top two
quartiles for the most recent data compared with 50% in the base year
(generally 2010/11). When compared to the most recent year, 50% of
indicators have improved, with performance declining in 27% of indicators
and 23% remaining unchanged overall.
165.  The Accounts Commission also requires auditors to report a
summary of the LGBF indicators the council has reported, which can be
seen in Exhibit 11. 
Appendix 2
63

Page 64

Best Value audit | 49 
Exhibit 11
Summary of LGBF indicators the council has reported 
Cost
indicators
%
Performance
indicators
%
Satisfaction
indicators
%
All
indicators
%
Movement in last year
Improved 70% 42% 73% 55%
Stayed the same 15% 25% 18% 23%
Declined 15% 33% 9% 27%
Movement since base year
Improved 60% 67% 0 59%
Stayed the same 0 8% 0 6%
Declined 40% 25% 100% 35%
Indicators in the top two quartiles
Most recent year 45% 53% 45% 51%
Base year  45% 51% 55% 50%
Source: LGBF at 8 September 2026
166.  Exhibit 11 shows that overall, LGBF performance has improved since
the base year, with 59% of all indicators improving and 51% now in the top
two quartiles. However, satisfaction indicators show a significant
deterioration, with 100% declining since the base year.
167.  Indicators where the council has seen the most significant
improvements or worsening of performance include: 
• The Average Total Tariff Score of the school leavers from the most
SIMD deprived 20% of Scottish data zones in 2025 was 681 points.
This is a 3.2% increase on last year and is also above the Average
Total Tariff Score of school leavers from similar SIMD areas in the
whole of Scotland (676 points). 
• The Average Total Tariff score for 2025 school leavers published in
the March 2026 edition of the national Insight benchmarking tool
was 864.4 tariff points. This is an increase of 2.8% compared to the
Appendix 2
64

Page 65

Best Value audit | 50 
previous year. North Ayrshire school leavers also outperform the
national figures across a range of SIMD deciles. 
• Total installed capacity of low carbon heat and electricity generation
across council's estate. Target was 30,137, the numbers achieved
was 30,230 for 2025/26.
• Proportion of operational buildings that are suitable for their current
use; the 2025/26 target was 93% and 95.2% was achieved.
168.  The Council is committed to improving areas where performance is
ranked as low when compared to other councils or its own targets. The
Council plan progress update (Year end 2025 to 2026) includes an action
tracker that closely monitors progress and the criteria for determining the
status of actions are set out in the Performance Management Strategy. 
169.  Given the service demand and cost pressures facing councils it is
unlikely that the council will be able to maintain performance across all the
services they currently provide in the medium to longer term. This means
that councils will need to make increasingly difficult choices about what
their service and performance priorities are. 
170.  The LGBF data should continue to be used alongside the council’s
own performance management framework as well as its engagements
with communities to assess local performance and priorities. This will
provide a breadth of data to inform and identify where improvements and
better outcomes for communities can be achieved. 
Progress against previous Best Value findings and
recommendations 
171.  Best Value findings and recommendations have been made in
previous years’ Annual Audit Reports, Management Reports on themes
prescribed by the Accounts Commission, and in Best Value reports
published by the Accounts Commission, which are based on Controller of
Audit reports. 
172.  Details of previous recommendations and progress the council is
making against these can be seen in Appendix 1, with 1] of the 4
recommendations made being implemented to date, and progress being
made with 3 recommendations. Overall, the pace and depth of
improvements resulting from the recommendations is positive, with many
improvements occurring quickly after the recommendations were
implemented. 
Appendix 2
65

Page 66

Best Value audit | 51 
The Council has appropriate arrangements in place in respect
of fairness and equality
173.  The Audit Planning Guidance sets out a requirement for audit work to
be carried out on Fairness and Equality Best Value characteristic at least
once during the audit appointment.
174.  Our work identified that the Council demonstrates that it meets the
requirements of the equality legislation and has a culture which
encourages equal opportunity. In line with legislation, the Council reports
on progress on how it meets the UK equality Act General Equality Duty
and the Scottish Government’s Specific Equality Duties every two years. 
175.  The Council demonstrates a continuous improvement in encouraging
a culture of equal opportunities, an example of this is in its decision to treat
‘Care – Experienced’ as an additional local protected characteristic. This
was in recognition of the many barriers and inequalities faced by people
who identify as ‘Care-Experienced.’ 
176.  Consultations were undertaken with staff during the development of
the 2025 – 2029 Equality Outcomes and Equality awareness is included in
induction training for both officers and Elected Members. Employees are
required to complete a mandatory Equality and Diversity Awareness
course on an annual basis. Specialist training is also available for officers
required to carry out Equality and Children’s Rights Impact Assessments
via an online module and face to face training.
177.  The Council has a dedicated Equalities and Inclusion Officer to
facilitate and take forward equality and diversity work across the Council.
There are also a number of other officers in services, whose work directly
supports the equality agenda. e.g. the Connected Communities team
regularly engage and support various community groups from LGBT
issues to age or refugee groups.
178.  North Ayrshire Council demonstrates that equality considerations are
mainstreamed into its strategic planning and processes in a number of
ways. The Council Plan 2023 – 2028 has the vision "A North Ayrshire that
is fair for all. It clearly states that its mission is working together to improve
the lives of the people in North Ayrshire and was developed alongside the
local community.
179.  Equalities implications are included in every committee report to
provide officers with the opportunity to highlight any equality related issues
arising from the subject of the equality paper. 
180.  The Council collects information and data on the impact of policies
on different equality groups to help inform future decisions and it considers
the views of different equality groups in making decisions. Examples of its
extensive engagement with local communities include during the 2025/26
and 2026/27 Budget Consultation process.
Appendix 2
66

Page 67

Best Value audit | 52 
181.  The engagement took the form of surveys and focus groups covering
key themes for savings, to make it easier for residents to respond, for
example the 2026/27 survey was separated into proposed savings for
‘Schools and related services for Children and Young People’ and ‘Other
Council Services’. Surveys could be completed on paper, online or via the
Customer Contact Centre (telephone). The survey asked residents about
potential impacts on protected characteristic groups and asked about
personal demographic information; this was used by services to help
inform impact assessments for budget proposals.
182.  Equality Outcomes are reported to Cabinet and Audit and Scrutiny
every two years, via the Executive Leadership Team (ELT). The actions
and indicators are reviewed on an on-going basis throughout the life of the
Equality Action Plan. Activities supporting equality and diversity are also
captured through Council Plan priorities and reported at Mid-Year and Year
End through the ELT, Cabinet and Audit and Scrutiny Committee.
Appendix 2
67

Page 68

Appendix 1 | 53 
Appendix 1
Action plan 2025/26
2025/26 Recommendations
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
1.Location factor
Location factors used in the
valuation and indexation
calculations for non-current
assets
The council used the January
BCIS location factor of
instead of the March location
factor of in the valuation of
depreciated replacement cost
(DRC assets) for the 2025/26
accounts in order to facilitate
the timeous preparation of
the annual accounts. 
The impact was not material
in 2025/26 but there is a risk
that it could be material in
future, depending on the
difference between the
location factors and the
values of the assets revalued.
The council should ensure
that the March location factor
is used within the indexation
and valuation calculations.
calculate
Accepted
The Council will incorporate
the provisional mid-March
location factors into the year-
end valuation process.
Responsible officer 
Head of Service (Laurence
Cree)
Agreed date 
31 March 2027.
2. Heritage asset ownership
The council were unable to
provide evidence that, Trinity
Mirror and Shards, a heritage
asset with a value of
£0.127m, was owned by
North Ayrshire Council.
The council should continue
its work to confirm ownership
of the asset.
Accepted 
The Council will continue it’s
work to confirm ownership of
the asset. 
Responsible officer
Head of Service (Aileen
Craig)
Agreed date 
31 March 2027.
Appendix 2
68

Page 69

Appendix 1 | 54 
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
3.Register of Interests
Register of interests for all
members should be
completed regularly and the
council website updated to
reflect this on a timely basis.
The council should ensure
that all elected members
complete and update their
register of interests on a
regular basis, including
prompt updates where
circumstances change. The
council should also ensure
that the public register on its
website is updated on a
timely basis to support
transparency and compliance
with related party disclosure
requirements. 
Accepted
The Council will add an
additional step to internal
processes whereby any
register of interests not
returned will be escalated to
Head of Finance.
Responsible officer 
Head of Service (Finance).
Agreed date 
31 March 2027
4. Members development
Councillors should actively
participate in the
development sessions made
available to them to enhance
their knowledge and
understanding of emerging
issues, governance
requirements, and best
practices. Attendance at
these sessions will help
ensure they remain informed
of relevant developments and
are equipped to fulfil their
roles and responsibilities
effectively.
The council should put
arrangements in place to
support positive engagement
by councillors with training
and development sessions.
Officers should also ensure
that any mandatory training
requirements are clearly
identified and communicated
as such. 
Accepted
The Council will continue to
engage with Elected
Members and promote
attendance at the Elected
Members Development
Programme scheduled
throughout the year which
provides opportunities for
regular development on key
topics.   
Responsible officer 
Head of Service (Aileen
Craig)
Agreed date 
31 March 2027
Appendix 2
69

Page 70

Appendix 1 | 55 
2025/26 Recommendations for charities administered by
North Ayrshire Council
Matter giving rise to
recommendation Recommendation 
Agreed action, officer and
timing
5. Dormant Trust
Six charitable trusts have
been dormant for six years or
more, and there is no clear
plan to bring them back into
use. As a result, there is a
risk that the trusts are not
meeting public benefit
requirements. 
The Council should look to
progress plans to use up the
funds of relevant trusts and
seek approval from OSCR for
the disbursement of any
remaining capital and winding
up of these Trusts.
Accepted
Finance will engage further
with Connected Communities
to promote utilisation of
dormant funds.
Responsible officers 
Head of Service (Finance)
and Head of Service (Rhonda
Leith).
Agreed date
31 December 2026.
Progress against Controller of Audit Report findings - 2025
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
1.Evidence of ongoing
community engagement
influencing decision
making
The council should continue
to evidence that it is engaging
with its communities and
acting on the results of
findings. 
Management response: 
A range of community
engagement activity
continues to be undertaken
across the Council. Details of
which are included as part of
the Council's performance
monitoring arrangements
Responsible Officer: 
Head of Service (Connected
Communities) and Head of
Service (Finance)
Action by:
31 March 2027
Appendix 2
70

Page 71

Appendix 1 | 56 
Follow-up of prior year recommendations, including any
previous Best Value report findings and recommendations
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
1. A number of significant
amendments have been
required to the Annual
Accounts to ensure in
particular that non-current
asset figures are fairly stated.
Management response: A full
review of capital accounting
year end procedures will be
carried out during 2025-26.
This will include the
procedures for reviewing
information provided by the
Council’s valuation team and
the use of external valuers.
Responsible Officer: David
Forbes, Senior Manager -
Finance and Revenues 
Action by: 31 March 2026
Auditor Observation -
Ongoing
Some improvement was
noted however several
amendments were required in
the 2025/26 accounts. Year-
end procedures should
include evidenced review of
asset classification, and
management’s assessment
as to the reasonableness etc
of the valuer’s assumptions,
including the location factors
used in DRC valuations and
indexation. 
Council response –
Progress 
We will continue to strengthen
procedures during 2026/27
and include evidence of our
review of asset classification
and assessment of the
reasonableness of the
valuer’s assumptions.
Natalie Graham, Senior
Manager - Corporate
Finance, Capital & Treasury
Action by: 31 March 2027
Appendix 2
71

Page 72

Appendix 1 | 57 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
2. Impairment of non-
current assets 
Accounting standards require
the council to assess at the
end of each financial year
whether there are any
indications an asset is
impaired. Most assets are
valued at least every five
years and generally when
valued, each asset is subject
to a physical inspection.
There are however some
assets that are never
revalued. The council’s
impairment review is largely
limited to assets revalued and
should be made more robust
and comprehensive.
Management response:
Under current procedures, an
impairment review is carried
out for all assets valued within
the financial year. In addition,
the valuation team
undertakes an annual
impairment review to
determine if any assets not
revalued in year are subject
to material change. The
Accounting Policies in relation
to asset impairment will be
reviewed and enhanced to
provide clear reference to the
impairment review process. 
Responsible Officer: David
Forbes, Senior Manager -
Finance and Revenues
Emma Mulholland, Team
Manager - Estates 
Action by: 31 March 2026
Implemented 
The accounting policy in
relation to asset impairment
has been enhanced to
provide clear reference to
assets not formally valued in
year. 
Evidence of the 2025/26
impairment review process
was provided. 
Appendix 2
72

Page 73

Appendix 1 | 58 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
3. Progress on Council
Plan actions. 
The council does not set out
in advance what criteria have
to be met for an ‘on target’
judgement to be made for
each quarter, relying instead
on updates from individual
teams leading on the
strategies and other
supporting evidence
(including ‘Next Steps’ from
the previous report). If the
‘Next Steps’ actions were
SMART it might be possible
to analyse whether all the
relevant ones within the time
period had been met and that
could feed into whether an
action was on target.
The Performance
Management Strategy is
being revised and will be
presented to the Audit and
Scrutiny Committee on 20th
November 2025. This public
facing strategy will contain
details of how to determine
the status of Council Plan
actions based on existing
strategies and next steps.
This approach will be
supported by additional
training for teams providing
updates during 2026. The
Council Plan Progress
Reports will include SMART
next steps. These next steps
will be recorded within our
performance management
system to track their status
transparently and inform the
status of Council Plan
actions. 
Responsible Officer: Isla
Cruickshanks, Senior
Manager – Policy,
Performance & Democracy
Action by: 20 November 2025
Implemented.
The Performance
Management Strategy was
refreshed in October 2025 in
and it details how to
determine whether an action
is on target. This is being
used within training to embed
a structured approach to
performance management
across the council at strategic
and operational levels.
Appendix 2
73

Page 74

Appendix 1 | 59 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
4. BV thematic report -
Transformation savings
The council’s latest MTFO
identifies a structural funding
gap of £46.7m (including
HSCP pressures) which must
be addressed as part of the
council’s Medium-Term
Financial Plan. Whilst we
recognise that transformation
alone will not offer the full
solution to the financial gap
identified in the MTFO, the
level of financial efficiencies
from the Sustainable Change
Programme should be
commensurate with the scale
of the financial challenges. 
The council should ensure its
plans are sufficiently ambitious
to respond to its financial
challenges. It should clearly set
out the extent to which savings
from transformation will help
address the budget shortfalls
set out in its Medium-Term
Financial Plan. 
Auditor Observation -
Ongoing
Work on achieving this is
ongoing with a number of
operational savings identified
and measures such as
increases in council tax as
well as the introduction of
special measures in the
HSCP.  
The agreed action date for
this is March 2029.
Council response –
Progress 
Details of Transformation
progress continue to be
governed through the
Council's Transformation
Board. Further Plans to
support the 2027/28 Budget
continue to be developed 
Responsible Officer
Head of Service (Finance)
Action by
March 2029 
Appendix 2
74

Page 75

Appendix 1 | 60 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
5. BV thematic report –
Transformation reporting
progress
The council does not currently
report publicly on how it is
progressing with delivering
transformation as a whole in
terms of planned and realised
financial and non-financial
benefits. 
To provide assurance to
elected members and the
public about how the council
plans to change to sustain
services in the future the
council should report publicly
on how it is progressing with
delivering transformation, as a
whole, in terms of planned and
realised financial and non-
financial benefits. 
Auditor Observation -
Ongoing
The council published a
Council Plan Six Monthly
Progress report – 1 April 2025
to 30 September 2025 on a
dedicated webpage, which
includes updates on the
Transformation Programme.
This could be enhanced by
including planned and
realised financial and non-
financial benefits.
The agreed action date for
this is March 2027.
Council response –
Progress 
Incorporated into the
Council's performance
reporting framework and
presented on a dedicated
webpage which includes
progress on transformation
activity 
Responsible Officer
Head of Service (Finance)
Action by
March 2027 
Appendix 2
75

Page 76

Appendix 1 | 61 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
6. BV thematic report –
Workforce innovation –
Joint Workforce
arrangements
There is scope for the council
to explore further where it can
work together with partners to 
share services and increase
collaboration.   
The council should explore
further where it can work
together with partners to share
services and increase
collaboration. 
Council Response -
Ongoing
A Shared Services
Leadership Group has been
established across North,
East and South Ayrshire
Councils. On 1 July 2026 a
shared Economic
Development service was
implemented with North and
East Ayrshire Council. Further
work is being progressed to
assess shared service
opportunities across a range
of functional areas. Following
the launch of the Scottish
Government Programme for
Government, Ayrshire
councils will engage with
Scottish Government to
consider further regional
collaboration opportunities.
Responsible Officer: Head of
Service (Finance)
Agreed date: 31 March 2029 
Appendix 2
76

Page 77

Appendix 1 | 62 
Matter giving rise to
recommendation
Recommendation, agreed
action, officer and timing Update 
7. BV thematic report –
Workforce innovation –
Measuring the impact of
workforce planning
The council could improve how
it monitors the effectiveness of
its workforce planning practice
by regularly reporting progress
against workforce planning
priorities. 
In addition to providing general
workforce planning updates,
the council should regularly
report its progress against its
workforce planning priorities to
elected members through its
Council Plan updates or other
means. 
Implemented.
The refreshed Workforce
Strategy 2024–2028
developed corporate actions
which are included on the
council’s performance
management system.  The
actions are updated and
reported on a six-monthly
basis.  
The action updates, together
with a separate explanatory
workforce planning update,
are provided in the Council
Plan performance report
which is reported to Cabinet
and the Audit & Scrutiny
committee. 
Appendix 2
77

Page 78

Appendix 2 | 63 
Appendix 2
Supporting national and performance audit reports 
Report name Date published
Local government budgets 2025/26 22 May 2025
NHS in Scotland: Spotlight on governance 28 May 2025
Delivering for the future: Responding to the workforce challenge  7 August 2025
Flooding in communities: Moving towards flood resilience  28 August 2025
Adult Disability Payment  18 September 2025
Scotland’s colleges 2025 2 October 2025
Improving care experience: Delivering The Promise 8 October 2025
Local government performance: Spotlight on culture and leisure
services
23 October 2025
Financial sustainability and taxes  13 November 2025
NHS in Scotland 2025: Finance and performance 4 December 2025
Delayed discharges: A symptom of the challenges facing health
and social care
8 January 2026
Community health and social care: Performance 2025 8 January 2026
Administration of Scottish income tax 2024/25 16 January 2026
Local Government in Scotland: Financial bulletin 2024/25 29 January 2026
The Scottish Budget 2026/24: Supplement to the Financial bulletin
2024/25
12 February 2026
Integration Joint Boards: Finance bulletin 2024/25 26 February 2026
Annual Assurance and Risks Report: A review of 2024/25 local
government audits in Scotland
12 March 2026
Transforming the approach to climate change:  Lessons from
public audit 
19 March 2026
Appendix 2
78

Page 79

North Ayrshire Council
2025/26 Annual Audit Report 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot 
AS.5.0
Appendix 2
79

Page 80

80

Page 81

NORTH AYRSHIRE COUNCIL 
24 September 2026 
Audit and Scrutiny Committee
Title:   Our Council Plan Year End Progress Reporting
Purpose: To advise the Audit and Scrutiny Committee on progress
in delivering Our Council Plan 2023 to 2028 as at Year
End 2025 to 2026.
Recommendation:  That Audit and Scrutiny:
(a) Notes the Year End Progress Report and Annual
Performance Report. 
(b) Notes the status of the Council’s performance
indicators within the LGBF Analysis of April 2026
Data Release.
(c) Notes the revisions to four Education 2025 to
2026 targets and the revision of 2027 to 2028
targets outlined in section 4 of this report. 
1 Executive Summary
1.1 Our Council Plan Progress Report Year End 2025 to 2026 (Appendix 1)
shows how our council is continuing to progress our priorities in line with
Best Value legislation in the six months ending 31st March 2026.  It is
supported by the Local Government Benchmarking Framework Analysis of
the April 2026 data release (Appendix 3), to show our performance relative
to others and learn from other local authorities.
1.2 When considering the performance indicators, LGBF indicators directly
relating to our Council Plan and accompanying narrative to demonstrate
impact, performance remains strong in many areas.  
1.3 Where challenges are resulting in less positive performance, these are
detailed within the accompanying reports for transparency alongside details
of how this will be addressed and within what timescale.
2 Background
2.1 Under the Local Government (Scotland) Act 1992 and Local Government in
Scotland Act 2003 we have a duty to demonstrate Best Value.  To ensure
we support our residents, fulfil our statutory duties and invite scrutiny, we
Agenda Item 3
81

Page 82

actively manage performance and seek to continuously improve our
reporting to make it accessible and engaging.
2.2 The Statutory Performance Information Direction 2024 determines how we
demonstrate Best Value.  It applies to the reporting of activity that has taken
place since 1st April 2025 for approximately three years.  Guidance on the
Direction is being released in stages.  This is being monitored to ensure
continued compliance.
2.3 Audit Scotland Actions
2.4 Best Value Thematic Audits have resulted in a larger Council Plan Progress
Report (Appendix 1).  For example, the inclusion of Workforce and
Transformation updates.
2.5 In September 2025, the Annual Audit Report 2024/25 resulted in a
recommendation relating to Next Steps and criteria to determine whether
an action status is on target.
2.6 Within the Council Plan Progress Reports, Next Steps are indications of
areas of focus for the coming six months, but not specifically actions.  Their
progress is included in the main narrative of the following six-monthly
report.  However, Audit Scotland has recommended these are SMART and
progress is recorded.
2.7 Rather than present progress for each Next Step (which made the report
very complex and not inline with the accessibility required under the
Direction), a general statement to say if they are on target is included. 
Progress is included in the narrative of the report, with only those not
progressing as expected or with a brief update, highlighted in each priority
section (a manage by exception approach).
2.8 The Performance Management Strategy (PMS) details a logical approach
to determining the status of actions and is linked to within the Action
Tracker of Appendix 1.  This ensures where performance has been
affected, even if externally influenced, this is reflected in the status to
ensure any issues can be addressed promptly.  This descriptive level of
detail is innovative as a local authority PMS tends to be a high-level
document.  A link is included above the Action Tracker in Appendix 1 and is
expected to meet the audit requirements.  Training actively encourages the
use of the PMS as a reference document for Senior Managers.  
82

Page 83

3 Assessment of Performance
3.1   Performance Indicators
There are 26 performance indicators within our framework. At Year End, the overall
status of the framework is:
Status Year End 2024/25 Year End 2025/26
On Target (Green) 13 (54.2%*) 17 (68%*)
Slightly Adrift of Target
(Amber) 5 (20.8%*) 4 (16%*)
Significantly Adrift of
Target (Red) 6 (25%*) 4 (16%*)
Data Only / Status
Unknown 2 1
(*Of PIs where status is known)
The status of a PI is determined by the following tolerances:
Status Description 
On target 
Slightly adrift of target (typically this represents a variance ≥ 1% and < 5% from
the target). 
Significantly adrift of target (typically this represents a variance ≥ 5% from the
target). 
Data only (PIs only) – this is where a target has intentionally not been set,
usually due to the indicator being a new indicator or where we can only partly
contribute to the outcome. 
Data not available / status unknown - (PIs only) the status is not available either
due to data not being available or no target being set.
(Source:  Our Performance Management Strategy 2023-2028 – October 2025
Refresh)
The details of those adrift of target are below:
CP_37 Average total tariff score of pupils living in SIMD 20% most deprived
areas (Red)
The Average Total Tariff Score of the school leavers from the most SIMD
deprived 20% of Scottish data zones in 2025 was 681 points.  This is a 3.2%
increase on last year and is also above the Average Total Tariff Score of school
leavers from similar SIMD areas in the whole of Scotland (676 points).  Given the
dynamic above it means that the poverty-related attainment gap is smaller than
last year - a small but significant gain in the endeavour to reduce the opportunity
gap between our young people living in the least and the most deprived areas of
North Ayrshire.
83

Page 84

CP_06 Average tariff score: All Leavers (Red)
The Average Total Tariff score for 2025 school leavers published in the March
2026 edition of the national Insight benchmarking tool was 864.4 tariff points. 
This is an increase of 2.8% compared to the previous year.  North Ayrshire
school leavers also outperform the national figures across a range of SIMD
deciles. There is a complex interaction of factors that determine the dynamic of
the Average Total Tariff Score of a school leaver.  North Ayrshire leavers are
offered a wider set of opportunities to choose more qualifications at different
SCQF levels - adding more points to the tariff portfolio of each young learner. 
Wider achievement is increasing in importance without diminishing the value of
academic achievement.
CP_42 Provided floor space of commercial/industrial space within our council
portfolio (sq. ft) (Red)
Performance is 394,684 against a target of 423,077.  Fluctuations across the
portfolio arise as a result of estate management actions, generally disposals to
existing tenants securing their retention in the area and facilitating their business
plans around location security and growth, which directly contributes to our
Community Wealth Building approach.  Specific projects also impact availability,
for example, units within Bridgegate, Irvine are not currently being marketed
while the long-term future of the area is under consideration.  There has also
been a re-baselining of available space following the transition of portfolio
management from the Business Support and Development Service to Property
Management and Investment.  Available space will increase in the coming years
as projects are delivered, for example at Kyle Road, Annickbank and i3.
CP_02 % of council budget directed via participatory methods (Red)
1.27% of council budget has been directed via participatory methods compared
to an ambitious 1.5% target.  Assuming the Scottish Government / COSLA target
remains at 1% for local authorities, this remains 0.3% ahead of the national
target.  The revised target is reflective of current progress and takes into account
the current funding landscape while exceeding national expectations. The
financial value of participatory budgeting is only part of the outcome as it can be
difficult to attach a financial value to the vast benefits of involving our people in
decision making processes and co-designing services alongside them. 
Participatory budgeting remains a key method of engaging our people with
services.
CP_07 % of school leavers entering positive destinations (LGBF) (Amber)
At the end of the 2024 to 2025 academic session, 95.7% of the 1,396 school
leavers identified by Skills Development Scotland for North Ayrshire have moved
on to positive post-school destinations.  As in previous years most school leavers
(72.6%) continue into Further and Higher Education.  This time, the percentage
moving into Higher Education courses (37%) has exceeded those who moved
into Further Education (35.5%) which has only occurred previously during the
pandemic and two post-pandemic years.  Within our LGBF family group we are
currently 3rd below Inverclyde Council (96.4%) and Eilean Siar Council (96.1%). 
This places us 16th in the overall rankings and within the 2nd quartile.  
84

Page 85

CP_40 Number of new build housing units reaching completion (all tenures)
(actual not cumulative) (Amber) 
The number of new build housing units reaching completion was 431 against an
annual target of 436.  This is a variance of 1.1%.  This indicator includes wider
private sector development where our council has limited influence over the total
number of completions achieved.  The shortfall of five units reflects delays in
completions across all tenures including within the SHIP programme.
3.1.1 Indicator Amendments and Recommendations
CP_41 Number of empty homes brought back into use (actual)
At Mid-Year 2025 to 2026, a Quarter Two figure of 78 empty homes brought back
into use was reported resulting in an on-target (green) status at that point. 
Following further year end verification, a small number of cases were identified
as having been closed prematurely and the Quarter Two figure has been revised
to 74.  While this amendment affected the position at Mid-Year, overall
performance at Year End exceeded the annual target.  Empty homes remain a
key focus for the service, and additional resources have been secured to
strengthen processes and reduce the likelihood of similar issues in future
reporting.  As a precaution, a review of previous years’ data was undertaken and
no anomalies were identified.  
CP_31 % of total household waste that is recycled (calendar year as per SEPA)
(LGBF)
At Mid-Year, the Quarter Two status for percentage of total household waste that
is recycled was 51.2% and was significantly adrift of target (red).  However,
further data checks have been undertaken and the Quarter Two figure has now
been revised to 56% meaning the Quarter Two status is on target (green).  The
overall figure for 2025 to 2026 (2025 calendar year) is 52.9% against a target of
53% meaning that this indicator remains on target (green).  All figures for 2025 to
2026 (2025 Calendar year) are still subject to verification by SEPA and will be
confirmed in October.
CP_29 Overall carbon emissions (tonnes) (Non-domestic Council estate)
At Mid-Year, the Quarter Two overall carbon emissions (tonnes) (non-domestic
council estate) was 3,313.  This was a provisional figure and has since been
confirmed as 3,030 by the service, which now has all available data to complete
the calculation.  Quarterly targets are intentionally not set for this indicator due to
the dynamics of the data over short time periods, therefore the status remains
unchanged as “data only” for the quarter.  Annual targets are set and are
unaffected by this amendment.
CP_19 Proportion of operational buildings that are suitable for their current use
(LGBF)
The provisional figure for 2024 to 2025 was incorrectly reported as 95.4% rather
than the correct figure of 95.2%.  This has been updated within this report and
the status is unaffected.  
85

Page 86

3.2 Actions
There are 47 actions within Our Council Plan, with one reported directly through the
Health and Social Care Partnership (HSCP) and excluded from this report.  Of the
remaining 46 actions, 45 are on target (green) and one is slightly adrift of target as
at Year End.
Our Performance Management Strategy details how to determine whether an action
is on target.  This is being used within training to embed a structured approach to
performance management across our council at strategic and operational levels. 
As described in 2.8 above, it is expected to fulfil the Annual Audit 2024 to 2025
recommendation relating to managing action progress effectively.
3.2.1 Actions Adrift of target
CP10 Increase the number of homes in the area through a mix of private and
social developments and bringing empty buildings back in to use (Amber)
This action has been noted as amber due to the linked performance indicator
‘CP_40 Number of new build housing units reaching completion’ not meeting its
target.  As discussed above, the number of new build housing units reaching
completion was 431 against an annual target of 436.  This is a variance of 1.1%. 
This indicator includes wider private sector development where our council has
limited influence over the total number of completions achieved.  The shortfall of
five units reflects delays in completions across all tenures including within the
SHIP programme.
3.3 LGBF Analysis of April 2026 Data Release
The data release shows 20 of our 33 priority indicators are in the top two quartiles,
this includes areas such as ‘Proportion of pupils entering positive destinations’,
‘CO2 emissions area wide per capita’, and ‘Percentage of Unemployed People
Assisted into work from Council Programmes’.
Our short term (most recent one year comparison) is showing an improvement in 24
of our 33 priority indicators, with only seven demonstrating a decline in
performance.  Improved indicators include ‘Proportion of children meeting
developmental milestones’ and ‘Percentage of income due from Council Tax
received by the end of the year’.
3.4 Key Highlights
3.4.1 Wellbeing
• During 2025 to 2026, our Money Matters team helped increase North Ayrshire
residents’ income by more than £20 million.  
• Fairer Futures continued to develop through strong partnership with
communities and the third sector, focusing on building trust, improving access
to support, and embedding lived experience in service design and decision-
making. 
86

Page 87

• An independent report highlighted strong progress in Community Wealth
Building through the regional Ayrshire Growth Deal project, supported by £3
million of Scottish Government funding with the programme assisting over
1,000 Ayrshire businesses and expanding opportunities to benefit from public
sector investment. 
• The delivery of the 2024 to 2027 Community Wealth Building Strategy has
continued, with progress monitored across all six Community Wealth Building
pillars.
• North Ayrshire has continued to play a national leadership role through
facilitation of the Scotland-wide Community Wealth Building Practitioners
Network, supporting the sharing of good practice and innovation across
Scotland.
• The Wellbeing Economy Dashboard continues to be developed and used to
strengthen understanding of economic, social and environmental outcomes,
supporting evidence-based decision making and performance monitoring.
• Training and a new child-friendly complaints process were introduced to
embed children’s rights in everyday practice, supporting implementation of
the UNCRC in Scotland.
• The Equal employability service has been further embedded through its move
to Lochshore Park, enhancing support for people with health conditions and
disabilities through improved facilities and opportunities.
• Strong progress has been made in delivering new and affordable homes
through an expanded housing investment programme, increasing targets and
advancing key developments to meet local housing need.  431 homes have
been completed during 2025 to 2026.
• Efforts to reduce empty homes have been strengthened, with 432 properties
brought back into use and continued support offered to owners to increase
housing supply within communities.
• Ongoing investment in existing council homes is improving safety, comfort
and energy efficiency, helping to reduce costs for tenants while informing
long-term housing and sustainability plans.
• Tenant engagement and performance scrutiny remain strong, with high
satisfaction levels and ongoing improvements informed by tenant feedback,
inspections and targeted action plans through to 2028.
3.4.2 Communities and Local Democracy
• In 2025 to 2026, 431 adults and 1,955 of our young people gained recognised
national awards
• Over the year, a total of 489 groups were supported to access external
funding.
• 1,179 volunteering opportunities were participated in during 2025 to 2026.
• Over £600,000 was disbursed to local groups through Community Investment
Funding. 
87

Page 88

• Participatory Budgeting funding of over £204,000 attracted strong community
interest, with 324 nominations received and a significant number progressing
across youth, locality and community wealth building projects.
• Proposals from the locality planning review are being implemented across all
six localities following Cabinet approval in May.  This will help strengthen
participation in local democracy.
• The Champions Board Conference brought together care-experienced young
people to share their views, build connections and help shape future activity,
strengthening the council’s commitment to keeping The Promise.
• Over £800,000 of funding has been secured in partnership with the Scottish
Government’s Islands Programme to support key projects on Arran,
enhancing community facilities and infrastructure in line with national
priorities.
3.4.3 Climate Change
• The 7.560MW Nethermains Solar Farm has now moved into the Operation
and Maintenance Phase following the works completion certificate being
issued in January 2026.  
• The 5.344MW Shewalton Solar PV Farm was commissioned on 6 March
2026.  An official opening is expected to take place in the coming months. 
• A tree planting exercise was completed in January with a total of 8,050 trees
planted, over 65,000 to date, further supporting our Tree Planting and Nature
Network strategies. 
• A gas pumping trial was successfully held on the Nethermains site throughout
January - February 2026.  The trials were successful with a decision pending
on whether to proceed with the gas recovery works. 
• Phase Two of the CNI solar project is underway on Cumbrae, supporting 130
homes with renewable energy solutions to reduce carbon emissions and fuel
poverty while delivering wider community benefits.
• Through a sustained programme of targeted investment in initiatives such as
Building Management Systems (BMS), LED lighting upgrades and a range of
energy-efficiency improvements, underpinned by proactive monitoring of
energy use, the council has transformed the performance of its property
portfolio. These measures have delivered reductions in energy consumption,
playing a significant role in lowering carbon emissions and advancing the
council’s commitment to a more sustainable, low-carbon future.
• The Area Based Scheme continues to progress, delivering energy efficiency
improvements and expanding to new areas to help reduce fuel poverty and
support low carbon heating.
• The ECO4 Flex partnership has delivered over £1 million in external funding,
supporting 48 households with energy efficiency improvements and low
carbon heating measures.
• Strong collaboration has supported local suppliers to secure contracts worth
£32 million over the year, reinforcing the council’s commitment to sustaining
the local economy and resilient supply chains.
88

Page 89

• Community engagement is supporting the development of Community
Climate Action Plans, with mapping and digital tools helping residents shape
local priorities and actions.
• Nature-based improvements and biodiversity activity have been strengthened
through partnership working, investment, and community-led projects,
enhancing local environments and supporting conservation across North
Ayrshire.
• Investment in active travel infrastructure, supported by Levelling Up Fund
funding, is improving walking and cycling routes, enhancing accessibility, and
expanding sustainable travel opportunities across North Ayrshire.
• Enhancements to public transport infrastructure have improved accessibility
and reliability, including the installation of real-time information and upgraded
bus stops and shelters.
3.4.4 A Sustainable Council
• North Ayrshire Council’s scheduled Controller of Audit (Section 102) Best
Value report was considered by the Accounts Commission in October and
Council in December.  The findings are extremely positive, highlighting a
culture of continuous improvement, a proactive focus on addressing
inequalities in our communities and stating the council is “an exemplar of how
to do transformation well”.
• Budget engagement activity generated strong community input, with over
1,100 responses helping to shape a £485 million budget, including investment
in renewable energy and measures to reduce child poverty.
• Significant external funding, including over £1.5 million from the Vacant and
Derelict Land Fund, £376,535 for council-led projects and £397,000 for
community groups through UKSPF, alongside £1.5 million for Pride in Place,
is supporting regeneration and community development across North
Ayrshire.
• We have established the Ayrshire Collaborative to explore transformational
working approaches and improve service delivery through the Public Sector
Reform lens.
• Progress continues on property rationalisation, with construction underway on
a new Customer Service Centre and plans in place to consolidate services
into Cunninghame House to support efficiency and regeneration.
• Following the approval of the Generative AI Policy by Cabinet providing clear
guidance for employees, a trial is underway to test additional functionality. 
4 Target Setting
4.1 Target Amendment Proposals - Education
A recommendation to amend the 2025 to 2026 targets was agreed by Cabinet in
September 2025.  Proposed amendments have been made following the
publication of confirmed 2024 to 2025 school leaver attainment data released in
February 2026.  
89

Page 90

(The total tariff measure is based on a complex national calculation using leavers’
highest qualifications and attainment data, meaning an interim figure cannot be
accurately calculated locally during the school year.  As a result, only confirmed
annual data which becomes available through the national release in February
2027 can be used to inform targets.  Therefore, adjusting a target at March 2026
during the 2025 to 2026 academic year cannot be based on any internal information
or data more recent than the 2024 to 2025 academic year.)
The proposed targets for Education are as follows:
PI Description
2025 to 2026
Academic
Year Original
Target
2025 to 2026
Academic
Year
Proposed
Target
CP_37 Average total tariff score of pupils living in
SIMD 20% most deprived areas 720 690
CP_06 Average tariff score: All Leavers 910 880
CP_38 Average total tariff for care experienced
Young People 470 480 
4.2 Targets for 2027 to 2028
Targets for 2026 to 2027 were approved by Cabinet on 1 September and are
included in Appendix 1.  It is proposed that 2027 to 2028 targets only be
changed where it is evident our operating environment has changed
substantially since the targets were set during the creation of our Council Plan
Performance Framework in 2023 (published in January 2024).  As a result of
this, it is proposed the following 2027 to 2028 targets are revised: 
Description Existing
2027/28
Target
Proposed
2027/28
Target
Expected
Performance
Trend
Comments
CP_36 Number of residents
participating in community
learning and development
activity work:
20,600 23,500  This target will be re-evaluated
once 2026 to 2027 results are
known and any opportunities for
additional funding which could
increase delivery are confirmed.
90

Page 91

Description Existing
2027/28
Target
Proposed
2027/28
Target
Expected
Performance
Trend
Comments
CP_39b Number of
unemployed people
progressing into
employment as a result of
participation in council
funded or operated activities
550 475  There is a challenging funding
landscape for example the
reduction in revenue resource
as a result of the end of the
Shared Prosperity Fund and
transition to the Local Growth
Fund on a regional basis.  The
amended target aims to
continue the ambition of
2026/27, increasing
employment across North
Ayrshire.
CP_10a % of procurement
spent on local enterprises
27% 28%  Moderate growth in the
percentage is expected over the
medium-term however the
target is limited due to North
Ayrshire having no tier 1
construction contractors. 
Running parallel to this measure
is the actual local spend value
which could be considered more
important than the percentage.
CP_28 Hectares of vacant
and derelict land in North
Ayrshire
1,000 830  The total hectares of vacant and
derelict land is influenced by the
development and management
of land in private ownership as
well as proposals for council
owned sites that are subject to
external funding.  The external
funding landscape is
challenging due to reducing
funding levels within
programmes.  The target of 830
is expected to be achieved by
March 2028 which aligns with
the delivery of the Local
Regeneration Fund projects.
CP_27 Street Cleanliness
Index - % Clean
87% 89%  -
CP_20 Overall percentage
of road network that should
be considered for
maintenance treatment
34.8% 32%  Through targeted additional
investment agreed as part of the
council’s budget setting
decisions over recent years,
aligned to prioritised
maintenance treatments, North
Ayrshire’s road condition
continues to improve. 
91

Page 92

Description Existing
2027/28
Target
Proposed
2027/28
Target
Expected
Performance
Trend
Comments
CP_02 % of council budget
directed via participatory
methods
2.5% 1.3%  Assuming the Scottish
Government / COSLA target
remains at 1% for local
authorities, this remains 0.3%
ahead of the national target. 
The revised target is reflective
of current progress and takes
into account reductions in
capital programmes and
external funding while still
exceeding national
expectations.
CP_30 Total installed
capacity of low carbon heat
and electricity generation
across our council’s estate
25,000 32,000  Based on a review of solar PV
installation programmes, it is
proposed the target is amended
to 32,000kW. 
CP_31 Percentage of total
household waste that is
recycled (calendar year as
per SEPA)
57% 53%  Despite relatively strong
performance compared to other
local authorities, the proposed
target is lower to reflect
challenges relating to legislation
and contamination levels. 
Actions have been taken to
improve the separation of Waste
Upholstered Domestic Seating
(WUDS) from within our bulky
waste collection service to help
minimise the impact of the
change in legislation.
Contamination levels within the
purple bin for glass, cans and
plastics have contributed to a
decline in performance. An
increase in the type of wood
being deposited at recycling
centres that is only suitable for
biomass recovery and not for
recycling, is also impacting
performance. 
92

Page 93

Description Existing
2027/28
Target
Proposed
2027/28
Target
Expected
Performance
Trend
Comments
CP_47 Gross rent arrears
(all tenants) as at 31 March
each year as a percentage
of rent due for the reporting
year
4.5% 7%  A change in the rent arrears
calculation has resulted in the
proposed target of 7%.  Though
most recent performance is 8%
(2024 to 2025) additional
staffing resources and the
software being acquired for
arrears management will help
achieve this target during 2027
to 2028. 
5 Proposals 
That the Audit and Scrutiny Committee: 
(a) Notes Year End Progress Report and Annual Performance Report.
(b) Notes the status of the council’s performance indicators within the
LGBF Analysis of April 2026 Data Release.
(c) Notes the revisions to four Education 2025 to 2026 targets and the
revision of 2027 to 2028 targets outlined in section 4 of this report.
6 Implications/Socio-economic Duty
Financial
6.1 None.
Human Resources
6.2 None.
Legal
6.3 These reports demonstrate how we meet our statutory duty of Best Value
through compliance with the Statutory Information Direction 2024.
Equality/Socio-economic
6.4 None.
Climate Change and Carbon
6.5 None.
Key Priorities 
6.6 The Council Plan Progress Report outlines how we will actively manage the
delivery of Our Council Plan priorities.
Community Wealth Building
6.7 None.
93

Page 94

Islands Communities Impact Assessment (ICIA)
6.8 None.
United Nations Rights of the Child (UNCRC)
6.9 None.
Consumer Duty
6.10 None.
7 Consultation
7.1 The Executive Leadership Team (ELT) and Cabinet have reviewed and
scrutinised the report prior to consideration by the Audit and Scrutiny
Committee.
Aileen Craig
Head of Service (Democratic) 
For further information please contact Isla Cruickshanks, Senior Manager
(Policy, Performance and Democracy).  Email IslaCruickshanks@north-
ayrshire.gov.uk
Background Papers - None.
94

Page 95

Our Council Plan
Six Monthly
Progress Report
1 October 2025 to
31 March 2026 
Appendix 1
95

Page 96

Contents
Our Performance at a Glance ................................................................................................. 1
Welcome ................................................................................................................................. 2
Wellbeing ....................................................................................................................... 4
Communities and Local Democracy ............................................................................. 15
Climate Change ............................................................................................................ 26
A Sustainable Council ................................................................................................... 36
Performance Summary ......................................................................................................... 54
Performance Indicators Adrift of Target ....................................................................... 54
Indicator Amendments and Recommendations .......................................................... 55
Actions Adrift of target ................................................................................................. 57
Performance Indicators ........................................................................................................ 58
Action Tracker ....................................................................................................................... 62
96

Page 97

Our Council Plan Progress Update – Year End 2025 to 2026  Page 1 of 67
Our Performance at a Glance
Residents’ income
increased by more
than £20 million
through our Welfare
Advice Services in
2025 to 2026
£800,000 shared in
Arran between three
projects – a youth
centre, island hub and
marine infrastructure
£685,740 awarded to
14 community
projects across North
Ayrshire during 2025
to 2026 
16,279 trees were
planted during the
financial year 2025 to
2026, exceeding our
target
60 people attended
our third annual Older
People’s Voice
Conference 
We are embedding
Children’s Rights in
our everyday decision-
making, supporting
the UNCRC
Over 1,000 local
businesses supported
by our Community
Wealth Building
Programme
We launched our 2026
to 2027 Budget
Consultation and
received 1,125
responses
53 Digital Learning
Sessions delivered
supporting 192 people 
Our Solar Farms are
actively generating
renewable electricity
1,500 pupils took part
in climate change
education during
2025 to 2026
Over 400 employees
attended our A Great
Place to Work event
to learn more about
workplace support  
97

Page 98

Our Council Plan Progress Update – Year End 2025 to 2026  Page 2 of 67
Welcome
Welcome to our Year-End Progress Report on our Council Plan 2023 to 2028.  This report
covers the period 1 October 2025 to 31 March 2026.  Our Council Plan is our contract with
our residents and details how we are progressing our four priorities of Wellbeing,
Communities and Local Democracy, Climate Change, and A Sustainable Council: 
Our Vision: A North Ayrshire that is fair for all
Our Mission: Working together to improve the
lives of our people in North Ayrshire
Delivery of our Council Plan is progressing positively with 81% of our indicators where the
status is known either on target or just slightly adrift of target, and 100% of our actions are
on target or just slightly adrift of target.  We regularly compare our performance to other
local authorities with similar demographic traits through the Local Government
Benchmarking Framework (LGBF) and include information on this within our Council Plan
reporting.  There are 33 LGBF indicators that link closely with our Council Plan priorities and
20 of these 33 indicators are in the top two quartiles.  
North Ayrshire Council’s scheduled Controller of Audit (Section 102) Best Value report was
considered by the Accounts Commission in October, with the Commission’s findings
considered by Council in December.  This report is an overview of all recent Best Value audits
and the findings are extremely positive, highlighting a culture of continuous improvement, a
proactive focus on addressing inequalities in our communities and stating the council is “an
exemplar of how to do transformation well”. 
98

Page 99

Our Council Plan Progress Update – Year End 2025 to 2026  Page 3 of 67
Through our extensive and accessible 2026 to 2027 budget consultation, over 1,200
responses from our residents and community groups were received and helped to shape
priorities across schools, services for young people and wider council services, with targeted
engagement ensuring the voices of our young people and those who are care-experienced
were also heard.  This feedback directly informed the setting of our budget (approved in
February 2026) alongside Equality and Children’s Rights Impact Assessments.
Since the launch of our new Money Smart Team in May 2025, we have helped increase
North Ayrshire residents’ income by more than £20 million by giving debt advice in addition
to supporting individuals and families with their finances, to ensure they are able to access
and maximise benefits with services.  
A major milestone in our council’s journey to net zero was achieved with the successful
delivery of council-owned solar farms at Nethermains and the former Shewalton landfill site.
As the first projects of their kind to be owned and operated by a Scottish local authority,
these fully energised sites are already generating renewable electricity while providing a
long-term income stream for our council.  Revenue from the solar farms will be reinvested to
support local services, tackle fuel poverty and enable community-led renewable energy
initiatives.  
During the year, Connected Communities continued to support groups to access funding and
be involved in decision making. Local people decided where small grants participatory
budgeting should be awarded, including specific grants of up to £2,000 for organisations
with Community Wealth Building aspirations.
To give context to the environment in which we deliver our services, some key measures are
highlighted below: 
Together we will ensure a
North Ayrshire that is fair for all. 
Population of North Ayrshire:
134,010 (2024)
18.0% of our children live in
poverty after housing costs 
(2025)
28% of our households live in
fuel poverty (2022 to 24)
68.1% of working age
population is in employment
(June 2025)
10.9% of people earn less than
the living wage (2025)
Area wide CO2 emissions are
540.1kt CO2E (July 2023)
99

Page 100

Our Council Plan Progress Update – Year End 2025 to 2026  Page 4 of 67
Wellbeing
To transition to a wellbeing economy, delivering prosperity, wellbeing and resilience for local
people.
Key Activities
Money Smart
Our welfare rights and money advice
service helped increase North Ayrshire
residents’ income by more than £20
million over 2025 to 2026.  Our Money
Smart team helps individuals and families
with their finances, offering debt advice
whilst ensuring they are able to access
and maximise benefits. This can involve:
• Completing benefits checks and
confirming entitlement.
• Helping with claims for Universal
Credit and other DWP and Social
Security Scotland benefits.
• Advice and support with debts
including rent and Council Tax arrears.
• Information on housing services. 
• Budgeting advice.
Accessing Support
Work is underway to modernise and
simplify how residents access benefits,
making support easier to navigate.  This
includes ensuring the ‘No Wrong Door’
approach is embedded across all services,
making sure people get the right help, no
matter how they reach us.  Training and
awareness sessions have been expanded
to include colleagues in Education, schools
and third sector organisations to support a
more joined-up response.
A review of progress is also underway to
ensure the approach continues to be as
effective as possible.
Fairer Futures
Fairer Futures has continued to develop,
with communities and third sector
partners helping to shape how services
are designed and delivered.  Activity
remains focused on building trust,
strengthening relationships and bringing
services closer to people and our
communities.  This includes ongoing
development of community connector
roles and a Community Services Directory
to improve access to support.  
The Child Poverty Strategy team led a
workshop at the ‘Collaborating for Impact:
Improving Outcomes for Children, Young
People and Families Conference’, hosted
by Children in Scotland in partnership with
Glasgow City Council.  The workshop, co-
designed with Arran CVS, brought
together public and third sector partners
to ensure the ethical inclusion of lived
experiences in policy and service design.
Children and Families Plan
Significant progress was made on the
development of a shared Children and
Families Plan bringing together three
statutory duties (our Children’s Services
Plan, Child Poverty Action Plan and UNCRC
commitments) and other responsibilities. 
We have been actively working with third
sector interface colleagues ensuring
community voice and sector expertise are
embedded throughout.  
In addition, a third sector engagement
event was hosted at Saltcoats Town Hall in
partnership with Children
in Scotland.  This
enabled us to
explore how to
100

Page 101

Our Council Plan Progress Update – Year End 2025 to 2026  Page 5 of 67
evaluate progress so far and consider key
strengths and opportunities to improve
how our council works in meaningful
partnership with the third sector.  
Together, these developments are
strengthening collaboration, supporting a
more co-ordinated, community informed
and sustainable approach to reducing
inequality and improving wellbeing.
Family Enterprise Programme
The new Family Enterprise Programme,
developed in partnership with Ayrshire
College and The Ayrshire Community Trust
(TACT) and supported through the Child
Poverty Early Intervention Fund was
launched in March 2026.  Ten parents
participated in curriculum co-design
sessions with Ayrshire College tutors,
helping to shape a 12-week accredited
programme due to begin in April 2026. 
This initiative will provide parents with
accredited entrepreneurial training and
access to small business start-up grants. 
By addressing barriers such as limited
childcare flexibility and opening new
economic opportunities, the programme
aims to increase financial security and
contribute to North Ayrshire’s growing
wellbeing economy.  
Smart Data Foundry
We have developed a new analytical
indicator which measures the proportion
of people whose income is made up of
more than 40% benefits, excluding
universal payments, to ensure a more
reliable understanding of need.  A
specialist working group, including a
representative from our Information
Governance team, is preparing to link
internal data sources to the Smart Data
Foundry platform.  This will provide a
richer, more detailed picture of local
circumstances and enable a more accurate
targeting of support.  
Poverty Awareness
Almost 300 employees have completed
our council’s dedicated child poverty e-
learning module earning their Child
Poverty Informed digital badges, with
many committing to participate in ongoing
quarterly sessions.  Face-to-face learning
sessions have also been developed in
partnership with the third sector and are
being rolled out.  Positive feedback has
been received and this engagement with
the training demonstrates a deepening
organisational understanding of the
challenges facing families and our aims to
ensure North Ayrshire is fair for all.
Collaboration for Health Equity in Scotland
(CHES) 
Progress is being made across the three
workstreams of Good Start, Good Jobs
and Good Health, including system
mapping, closer collaboration across
services and partners, and exploring
opportunities to test innovative new ways
of working. 
A workshop at Ardrossan Civic Centre on
23 October 2025, brought together 48
representatives from across the public,
private and third sectors.  It focused on
identifying local good practice in
improving health equity, and what further
action is needed to close the gap between
policy intent and real-world impact. 
Engagement also took place with the
Community Planning Partnership Board in
March 2026 to share progress made in the
local programme and seek further support
from partners to further enable CHES
support to reduce health
inequalities in our
communities. 
101

Page 102

Our Council Plan Progress Update – Year End 2025 to 2026  Page 6 of 67
Early Years Admission Policy
Alterations to the Early Years (EY)
admissions policy approved by Cabinet in
October 2025, bring local practice in line
with the wider Scottish approach where
catchment areas do not apply.  In North
Ayrshire, parents can select up to three
council-funded establishments. 
Applications will be assessed using a
revised Priority Banding System which will
come into effect from session 2026 to
2027.
Skills Capacity Building
We are continuing to build capacity in the
leadership skills of middle and senior
educational establishment staff.  The
Raising Attainment Team has continued to
support leadership development across,
EY, Primary and Secondary establishments. 
This has included regular training and
development opportunities for EY
Managers and Senior Leaders, alongside
regular data clinics for EY and school
middle and senior leaders supporting
improved data literacy skills and the use of
data in raising attainment and
achievement, including sessions led by
Head Teachers.  EY, Primary and Secondary
attainment discussions have continued to
provide opportunities for peer support
and challenge.  Networks for Secondary
Senior Leaders and Heads of Faculty
(English and Maths) have also supported
professional learning and development
around shared priorities, literacy and
numeracy.  In addition, Service
Improvement Groups, with participation
across EY, Primary and Secondary sectors
have enabled shared leadership
opportunities in taking forward strategic
priorities including curriculum
development, the use of data and digital
learning.   
The Promise
We have successfully delivered the
Promise Education Award through a pilot
programme involving a targeted group of
secondary schools.  St Matthew's
Academy and Irvine Royal Academy have
achieved Levels 1 and 2 of the award, with
Ardrossan Academy, Kilwinning Academy,
Greenwood Academy and Auchenharvie
Academy actively progressing through the
programme. Building on the positive
impact of the pilot, the next phase will
focus on extending awareness, guidance
and support across additional
establishments and sectors to further
embed The Promise and strengthen
outcomes for care experienced learners.
We are supporting care experienced
learners through joint planning, improved
guidance and the development of a new
102

Page 103

Our Council Plan Progress Update – Year End 2025 to 2026  Page 7 of 67
Service Operating Procedure which will
detail how to deliver the Education Service
consistently and efficiently.  During the
last six months, progress has continued in
strengthening support for care
experienced learners through enhanced
partnership working, improved
governance arrangements and the
development of more robust planning and
reporting processes. 
Collaboration between the Education
Service and Health and Social Care
Partnership (HSCP) colleagues has
continued alongside activity in the
National Virtual Head Teacher network,
supporting the development of guidance
on cross-boundary information sharing
and promoting greater consistency of
practice.  The Keeping the Promise Award
programme (above) has continued to be
embedded across participating secondary
schools, while Champion Boards remain
established in all secondary schools,
ensuring that the views and experiences
of care experienced young people
continue to inform service development
and improvement activity. 
Consideration of explicit approaches to
involving care experienced young people
in Service policy development has been
built into the Service Plan.  The Service
Operating Procedure is in final draft and
provides a consistent framework for
supporting care experienced learners
across the Education Service, building on
the strengthened partnerships and
systems established during this period.
Winter Warmer Breakfast
From 1 December 2025 to 30 January
2026, a free breakfast was offered to all
North Ayrshire secondary school pupils on
school days through the return of our
Winter Warmer Breakfast Initiative.  The
aim of the initiative was to relieve some of
the financial pressure on families at a time
of year when this can be felt the most.  
United Nations Convention on Rights of a
Child (UNCRC) 
In February 2026, the council rolled out
training on Supporting Children’s Rights in
our Work, alongside a new child friendly
complaint handling process and principles. 
The aim is to embed children’s rights in
everyday decision making and supports
the UNCRC (Incorporation) (Scotland) Act
2024, placing children’s rights at the heart
of policy and practice.  
Education Services Ayrshire Growth Deal
Tool
We have continued to raise awareness of
our new tool which supports learners in
career planning that is focused on the
growth areas of the Ayrshire Grown Deal
(AGD). This work supports a key priority
within the Ayrshire Regional Skills
Investment Plan 2022 - 2025.  The tool
supports delivery of the AGD through
awareness-raising among children, young
people and school staff; curriculum and
pathways planning; and ultimately further
study and employment opportunities for
our young people of North Ayrshire.
Community Wealth Building
A new independent report has praised the
strong progress being made through the
AGD funded Community Wealth Building
programme in Ayrshire, highlighting its
growing and positive impact on local
businesses, fair work and inclusive
economic growth.  
The study carried out extensive research,
assessing performance
metrics, holding
extensive
discussions with
103

Page 104

Our Council Plan Progress Update – Year End 2025 to 2026  Page 8 of 67
a range of stakeholders, surveying local
enterprises and carried out a number of
case studies with local firms who have
been supported by the Community
Wealth Building programme by analysing
the four key pillars:
• Procurement - increasing local spend
by prioritising local suppliers and small
businesses in public and institutional
contracts.
• Promoting local jobs and embedding
fair work across Ayrshire.
• Making better use of assets for
community benefit.
• Promoting inclusive ownership
models.
Supported by £3 million of Scottish
Government funding, the programme has
already supported over 1,000 Ayrshire
business and increased opportunities to
benefit from further public sector
investment.  Described as a ‘pioneering
model’, the approach is helping to keep
wealth within our communities, creating
better jobs, strengthening local economy
and creating a more resilient regional
economy for the future.
Employability
Positive Pathways
Our council is supporting Third Sector
partner, The Ayrshire Community Trust
(TACT), to deliver ‘Positive Pathways’, a
new employability programme residents
get closer to work.  The 12-week initiative
combines personal development, one to
one coaching, E-learning and CV writing
support as well as volunteering
opportunities with local organisations.  
The programme begins with a two-week
STEPS to Excellence course, delivered by
qualified facilitators to build confidence,
help people recognise their potential and
support those who are long-term
unemployed or facing redundancy to
access training, employment or
volunteering opportunities. 
On completion of the programme,
participants are offered eight-week
Scottish Credit and Qualifications
Framework courses with Ayrshire College
– an SCQF Level 4 Health and Wellbeing
and SCQF Level 4 Elevate Employability
Award.  Volunteering placements can also
be explored to gain practical, hands-on
experience.  
Modern Apprenticeships
On 24 February, we held a Modern
Apprentice Recruitment Day at Ayrshire
College in Kilwinning focussing on
opportunities across our council services
including Business Administration,
Housing and Youth Work.  The event was
targeted at 16 to 19-year-olds either ready
to leave school or looking at employment
opportunities.  75 of our young people
attended and 10 Modern Apprenticeship
vacancies were filled.
During Modern Apprenticeship week from
2 March, we celebrated the commitment
and achievements of our learners working
towards their Modern Apprenticeship
qualifications as well as sharing details of
new opportunities available across North
Ayrshire.  As part of the week’s activities,
the Working North Ayrshire Team, in
partnership with Developing the Young
Workforce, hosted a “Your Next Move”
Youth Recruitment Event at Ayrshire
College’s Kilwinning Campus on 4 March. 
It attracted 250 attendees with 58
stallholders including
employers sharing
information.
104

Page 105

Our Council Plan Progress Update – Year End 2025 to 2026  Page 9 of 67
Specialist Employability Support
We have continued to embed the Equal
employability service following the
opening of its new location at Lochshore
Park, Beith in September. The Equal
programme supports people with long-
term health conditions and disabilities into
work and training as part of our council’s
“Your Next Move, Working North
Ayrshire” programme. Lochshore Park
offers more space and provides outdoor
opportunities and enhanced facilities in
modern surroundings.
Employability Awards
Over 140 nominations were received for
the third annual Employability Awards,
delivered through the Next Move,
Working North Ayrshire programme.  The
awards celebrate the achievements of
trainees, volunteers and modern
apprentices building skills, confidence and
experience on their journey to progress to
the world of work.  Taking place during
Careers Week, the event highlighted the
range of career pathways and support
available across North Ayrshire, marked by
the introduction of a new ‘Career Pathway
Excellence’ award.
Trade Skills Programme 
A new trade skills programme launched to
address local skills shortages in the
construction industry while improving the
confidence, experience and employment
opportunities for our young people.  The
Future Trades Programme, delivered in
partnership with Your Next Move,
Working North Ayrshire programme, CEIS
Ayrshire and supported by The Robertson
Trust, offers hands-on training across a
range of trades including bricklaying,
plastering, plumbing, joinery and painting
and decorating alongside industry
recognised qualifications and tailored
employability support.  
A total of 24 young people have
successfully taken part and attained their
Construction Skills Certification Scheme
(CSCS) with many already progressing to
interviews, work placements and job
opportunities. 
Housing 
Strategic Housing Investment Plan (SHIP)
In early 2026, we continued to make
strong progress in delivering new homes
and improving existing ones across North
Ayrshire.  Working alongside our
Registered Social Landlord partners, we
are delivering affordable housing through
our council’s SHIP.  The SHIP sets out
priorities for housing investment over the
next five years and explains how these will
be delivered to meet local housing need.
In October 2025, Cabinet approved
proposals to expand the SHIP, increasing
the overall target from 1,643 to 1,666 new
homes.  As part of this decision, the third
phase of the St Michael’s development in
Kilwinning was moved into the main
programme.  This phase will see 46 new
homes built at the former school site,
adding to the 119 homes already
delivered during the first two phases.
Two further council-led developments
have also been added to the main SHIP
programme for 2026 to 2031:
• Redburn Grove, Irvine – 16 new homes
as part of the redevelopment of the
Gypsy/Traveller site.
• Guthrie Road, Saltcoats – Seven new
homes following the demolition of an
existing block through
the Estates Based
Regeneration
Programme.
105

Page 106

Our Council Plan Progress Update – Year End 2025 to 2026  Page 10 of 67
Construction is already underway at
several sites, including Ayrshire Central in
Irvine, our council’s largest ever council
house development; the former Garnock
Academy site in Kilbirnie, and the former
King’s Arms Hotel in Irvine.
Sustainable Housing Investment
Alongside new build programmes, we
continue to invest in our existing council
homes to ensure they remain safe,
comfortable, and affordable to live in. 
Sustainability improvements such as
external wall insulation and solar panels
are being installed where appropriate,
helping tenants reduce energy costs and
address fuel poverty.  We are also piloting
a “whole house” retrofit approach, which
will help shape future investment
decisions and support our long-term
energy efficiency targets.  All investment
decisions are informed by detailed
property condition data and our 30-year
Housing Revenue Account business plan,
ensuring funding is targeted where it is
most needed.
Empty Homes
Reducing the number of empty homes
remains a priority.  As at 31st March, 432
empty properties were brought back into
use, increasing the supply of homes within
local communities.  Our Housing teams
continue to work closely with private
owners, offering advice and support to
help return vacant properties to use. 
Where appropriate, owners of former
housing association homes are also
supported to explore buy-back options.
Tenant Participation
The North Ayrshire Network, our
tenant-led customer group, helps to
challenge performance and support
continuous improvement to ensure our
tenants play a role in shaping how housing
services are delivered.  The group was
involved in reviewing key regulatory
submissions, including the Annual Return
on the Charter and Annual Assurance
Statement, before these were submitted
to the Scottish Housing Regulator.
The Tenant Inspection Panel continues to
review one area of service each year,
focusing on improvements that matter
most to tenants. Findings from the latest
Tenant Satisfaction Survey (TSS),
completed in February 2025 with 1,490
tenants (40.4%), are helping to shape
future service improvements. Overall
satisfaction with North Ayrshire Council’s
Housing Service remains high at 91.8%,
with positive movement across most
areas, indicating improved perceptions of
the service.
Compared with the previous survey,
satisfaction has increased in key areas
including overall service, neighbourhood
management, value for money, quality of
homes and repairs, while ratings for
keeping tenants informed remain strong.
Although satisfaction with opportunities
to participate in decision-making has
dipped slightly, it remains above the
sector average. The survey also
highlighted areas for improvement,
particularly around making homes easier
to heat, strengthening tenant
involvement, and improving awareness of
available support. Action plans are in
place to address these issues, with
delivery planned between 2025 and 2028.
Housing Regeneration Funding
We continue to actively seek external
funding to support housing delivery and
regeneration.  During
2025 to 2026, we
worked with the
Scottish
106

Page 107

Our Council Plan Progress Update – Year End 2025 to 2026  Page 11 of 67
Government and Trust Housing
Association to secure funding to support
housing for key workers on Arran.  The
council has been successful in securing
£1.838m from North Ayrshire Ventures
Trust and a further £1.169m from the
Scottish Government’s Regeneration
Capital Grant Fund towards the over £13m
investment required to regenerate
Bourtreehill Village Centre in Irvine.  The
grant funding will be utilised to develop
three new retail units in the area,
retaining existing retail tenants.  This will
allow the ageing existing retail and
residential accommodation to be replaced
with 35 new homes on the site.  The
existing retail provision has a number of
low demand vacant units which have
remained empty for some time.
Local Housing Strategy
Good progress has been made across our
four overarching outcomes set out in our
Local Housing Strategy:
More Homes at the Heart of Great Places -
Since April 2014, 975 homes have been
completed, including recent developments
at Fitzsimmons Wynd, Ardrossan, St
Mary’s Gardens, Largs, and Longacre
Place, Stanecastle, Irvine which were
developed throughout 2024 to 2025 and
2025 to 2026.
Major projects are underway, including
Ayrshire Central in Irvine, which will
deliver over 200 new homes, and the
former Garnock Academy site in Kilbirnie,
which will provide 50 new council homes.
We also continue to work closely with
private developers.  Since April 2023, this
partnership approach has supported the
delivery of 528 new private sector homes. 
Development is now underway at all five
sites allocated through Local Development
Plan 2, which together will deliver over
1,000 private homes, alongside other
active sites such as Montgomerie Park,
Irvine, and West Byrehill, Kilwinning.
Affordability and Choice - Strong progress
has been made in improving affordability
and housing choice.  This includes
establishing the Arran Housing Task Force
to better understand local demand,
delivering 123 Housing First tenancies
through the Rapid Rehousing Transition
Plan (considerably ahead of target), and
expanding the council buy-back scheme to
increase the supply of affordable homes.
Affordable Warmth and Zero Emissions -
Significant steps are being taken to
support the council’s ambition to reach
net zero carbon emissions by 2030.  New
homes are being built with air source heat
pumps, improved insulation, and solar
panels.
The Area Based Scheme supports private
households by installing energy-efficient
and low-carbon measures in hard-to-treat
areas.  In addition, Energy Smart
emergency support payments have been
provided to residents at risk of fuel debt.
Improving the Quality of Our Homes - The
Estate-Based Regeneration Programme
continues to improve neighbourhoods by
addressing low demand housing,
antisocial behaviour, and environmental
issues.  Improvements include better
parking, paths, fencing, landscaping, and
communal spaces.
Through the Sheltered Housing
Reprovisioning Programme, refurbishment
has recently been completed at Barnett
Court, Saltcoats, and Cheviot Court, Irvine. 
Further works are planned
to start next year at
Vineburgh Court,
Irvine, and Laigh
Court, Beith.
107

Page 108

Our Council Plan Progress Update – Year End 2025 to 2026  Page 12 of 67
Next Steps
All next steps noted within the Mid-Year
Progress report are progressing as
expected and included in the narrative
above.
Next Steps to be achieved by September
2026 or as noted include:
• We will progress detailed planning for
access and benefit services in April
2026, prioritising improvements to the
housing benefit and council tax
reduction application process.
• We will use Smart Data Foundry
insights to routinely inform service
targeting, resource allocation and early
intervention.
• We will work with partners to identify
new opportunities through the Child
Poverty and Early Intervention Fund. 
• We will roll out face-to-face child
poverty learning sessions more widely
and embed learning into induction and
ongoing development.
• We will build on Fairer Futures by
regularly involving parents and young
people in shaping services.
• We will monitor and evaluate the
Family Enterprise Programme.
• We will continue to simplify routes
into financial, employability and
wellbeing support through the ‘No
Wrong Door’ approach and
community connectors.
• We will look to extend our Welfare
Rights Officer posts, recognising the
positive impact of this work on local
families. 
• We will finalise our joint Children and
Families Plan 2026 to 2029, bringing
together for the first time our formal
planning across children’s services,
child poverty and children’s rights by
September 2026. 
• We will use CHES and Community
Planning Partnership structures to
better connect child poverty work with
health, housing and education
priorities.
• We will help to shape national reports
summarising the impacts of CHES to
date and making recommendations to
relevant bodies to further accelerate
progress. 
• We will develop a small set of shared
outcome measures to show how
combined actions are reducing
financial pressure and improving
wellbeing for children and families.
• We will develop a new Education
Improvement Plan 2026-29, focusing
on key priorities as identified with
school staff, children and young
people, and other partners by
September 2026. 
108

Page 109

Our Council Plan Progress Update – Year End 2025 to 2026  Page 13 of 67
Case Study - Dirrans Centre, Kilwinning
The Dirrans Centre in Kilwinning, run by the North Ayrshire Health and Social Care
Partnership, provides specialist rehabilitation and reablement support for adults with
physical disabilities, brain injuries, and neurological and long-term conditions.  Originally
established in 1996 as a head injury unit, the centre has evolved to meet wider and more
complex needs, supporting people at different stages of recovery to rebuild independence,
confidence and quality of life.
Many people supported by the centre face significant physical, emotional and social barriers
following illness or injury.  Without tailored, compassionate rehabilitation, individuals can
experience isolation, declining mental wellbeing and reduced independence, placing
additional pressure on families and wider public services.
The Dirrans Centre takes a person-centred, strengths-based approach to rehabilitation.  Staff
work closely with individuals to support physical recovery, rebuild confidence and promote
independence, while also recognising the importance of emotional wellbeing and social
connection.  Services are delivered in partnership with our council and wider health and
social care services, ensuring coordinated and holistic support.
A key strength of the centre is its focus on relationships.  Service users consistently describe
the staff and fellow participants as a “soul family”, highlighting the importance of trust,
empathy and belonging in the recovery journey.
Feedback from service users demonstrates positive outcomes,
watch how the programme is making a difference by clicking on
the image on the right:
Individuals report significant improvements in both physical and
mental health, increased independence and renewed purpose. 
For some, the support received has been described as transformative, with several people
stating it has changed – or even saved – their life.
Beyond individual outcomes, the centre plays an important role in supporting North
Ayrshire’s ambition to build a wellbeing economy.  By helping people regain independence
and confidence, the service contributes to healthier communities, reduced reliance on
long-term care and better life chances for residents. 
109

Page 110

Our Council Plan Progress Update – Year End 2025 to 2026  Page 14 of 67
Case Study – Family Centred Wellbeing Service
The North Ayrshire Family Centred Wellbeing Service is helping families access the right
support placing wellbeing, relationships and early intervention at the heart of its approach.
Working closely with schools, health services, communities and third sector partners, the
Service provides coordinated support tailored to the needs of children, young people and
their families. By taking a whole-family approach, the services aims to reduce barriers,
improve wellbeing and help families build confidence, resilience and stronger connections
within their communities
Support ranges from emotional wellbeing and practical advice to help with financial
pressures, school attendance and family relationships. Crucially, families are supported in a
way that works or them, ensuring services are accessible, compassionate and focused on
long term positive outcomes.
Partnership working is central to the success of the service. Staff across agencies work
together to identify concerns early and provide joined up support before challenges escalate.
This collaborative model is helping families feel listened to, supported and better connected
to the services available in their local area.
The impact is already being seen across North Ayrshire with families reporting improved
wellbeing, greater confidence and stronger engagement with education and community
support. By focusing on prevention and early help, the Family Centred Wellbeing Service is
helping create more positive futures for children, young people and families.
To learn more about the Family Centred Wellbeing Service and the support available for
children, young people and families, visit the service website: North Ayrshire Family Centred
Wellbeing Service. 
110

Page 111

Our Council Plan Progress Update – Year End 2025 to 2026  Page 15 of 67
Communities and Local
Democracy
We will have active, inclusive and resilient communities.
Key Activities
Nationally Recognised Awards
During 2025 to 2026, 431 adults and 1,955
young people gained recognised national
awards and accredited qualifications. 
Achievement routes included Duke of
Edinburgh Awards, Discovery Awards,
Personal Development Awards in Youth
Work, Youth Achievement Awards,
employability programmes and a range of
accredited learning opportunities
delivered through schools, community
settings and third sector partnerships.
A significant contributor to this
achievement was the Duke of Edinburgh's
Award programme, which engaged 1,019
young people during the year.   During
January 2026 to March 2026 alone, 108
awards were achieved and more than 600
young people, families and volunteers
attended the annual presentation event to
celebrate success.
The year's achievements were supported
by strong progression pathways.  Four
Youth Work Modern Apprentices
progressed into positive destinations,
while Discovery Award participants
achieved North Ayrshire's first Gold Award
alongside Silver and Bronze Awards. 
These achievements helped participants
build confidence, leadership skills and
employability, while supporting positive
destinations and lifelong participation in
learning.
Community Capacity Building
489 community groups and organisations
were supported to access external funding
during the year, helping attract investment
into North Ayrshire communities and
strengthening community wealth building.
Support included funding advice,
governance development, business
planning, Community Benefit
opportunities, Community Asset Transfer
support and direct assistance with funding
applications.
Community organisations accessed
investment from programmes including
the Community Investment Fund, National
Lottery, Creative Scotland, Community
Benefits, North Ayrshire Ventures (NAVT)
and Community Renewable Energy
Generation Fund (CREGF).  During January
to March 2026:
• £92,214 was invested in community
assets and capacity, including:
o £17,865 for Three Towns Growers
Community Hub
o £20,000 for Ardrossan Outdoor
Bowling Club
o £50,428 for Saltcoats Victoria
Football Club
• £60,000 secured through child poverty
partnership activity
• £19,950 National Lottery investment
supporting older people in Girdle Toll
• £100,000 award supporting the Fairer
Food Network
Alongside direct funding, Community
Benefits activity generated
additional resources for
local groups, including
IT equipment, sports
kits, match funding,
safety equipment,
111

Page 112

Our Council Plan Progress Update – Year End 2025 to 2026  Page 16 of 67
white goods and financial donations.  This
support enabled community organisations
to improve facilities, expand services,
employ staff, develop community assets
and deliver locally identified priorities,
helping to ensure more wealth and
investment remains within North Ayrshire
communities.
Volunteering and Leadership
1,179 volunteering opportunities were
participated in this year, demonstrating
the significant contribution volunteers
make to community wellbeing, leadership,
environmental action, sport and active
citizenship across North Ayrshire. 
Opportunities were created through youth
work programmes, community
organisations, Discovery Awards, climate
action projects, Duke of Edinburgh
Awards, community events, Community
Sports Hubs and Active Schools
programmes.  Managed volunteers also
supported delivery in English for Speakers
of Other Languages (ESOL), Core Skills and
youth activities.
Young people played a particularly
important role in volunteering activity. 
Duke of Edinburgh participants completed
volunteering placements across their
communities, while youth forums,
Champions Boards, Young Ambassadors
and Sports Academy pupils contributed to
community action, local democracy and
peer leadership.
During 2025 to 2026, 97% of all Active
Schools activity was delivered by
volunteers.  A total of 141 Sports Academy
pupils volunteered within school and
community sport programmes, 134 Young
Ambassadors undertook leadership
activity, and 394 new Move and Improve
Leaders trained across 19 schools in
January to March 2026.  Active Schools
also delivered 28 events involving 1,724
young people, supported predominantly
by volunteers, while also engaging 5,346
primary pupils, 2,319 secondary pupils
and 44 ASN pupils in extracurricular
activity. 
Funding
£204,159 was available for community
groups to apply for via Participatory
Budgeting.  The total was shared between
the following areas:
• £124,351 to support locality project
applications up to £1,000.
• £30,000 to support Community
Wealth Building applications up to
£2,000.
• £48,808 to support youth project
applications up to £1,000.  
Our Connected Communities Service
received 324 nominations from
community groups and organisations for
consideration.  From these, 78 youth
projects, 158 locality projects and 27
Community Wealth Building Fund projects
were identified as meeting the necessary
criteria.  The full results can be found
here. 
Links to Community Wealth Building
continue to be demonstrated through the
Community Investment Fund (CIF) and
other grants administered to our
communities, in addition to ongoing work
around strengthening the role of locality
networks and development of locality
'Place Insights'. The delivery of the Test It!
Programme allows us to share
skills across partners and
support enterprising
activity within the
third sector.
112

Page 113

Our Council Plan Progress Update – Year End 2025 to 2026  Page 17 of 67
One locality has now fully utilised its
allocation of CIF and we are working with
them to understand the learning which
can be shared with others who are
nearing the end of their allocations to
ensure a smooth transition. We are also
continuing to identify any external funding
opportunities which can help to support
locality priorities.
‘Elect Her’ Workshop
In November our council ran the ‘Elect
Her’ workshop providing an opportunity
for women in North Ayrshire to get
involved in local democracy.  The event
was targeted at those looking to make a
change in their communities and/or who
wished to put themselves forward as a
councillor.  Held in the Chambers, seven
people attended, enabling informal yet
detailed discussions about the role of a
councillor with Elected Members.
Following the success of this workshop,
our council held another in February for
anyone interested in becoming a
councillor within North Ayrshire. The
workshop aimed to increase participation
in local democracy while educating and
inspiring potential candidates for local
government. A total of 13 people
participated in the event, all sharing a
passion for their community and taking
the opportunity to learn from some of our
councillors in elected office. 
Care Experienced Champions Board
Conference
Care-experienced young people from
secondary schools across North Ayrshire
came together on Wednesday 26
November 2025 for their first ever
Champions Board Conference at Saltcoats
Town Hall.  Following a similar format to
the Joint Cabinet, the conference gave our
young people the chance to explore what
The Promise means in practice, meet and
collaborate with peers, share their views,
and begin shaping their summer
programme for 2026.  The Champions
Board Conference marks an important
step in ensuring our council continues to
take meaningful and practical action to
help North Ayrshire keep The Promise.
Youth Participation Strategy
On 27 January, an event was held at
Saltcoats Town Hall to reflect on and learn
from our Youth Participation Strategy.  A
new strategy is being developed and it
was our aim to bring those who work with
our young people including community
partners, senior managers, Education and
Connected Communities teams together
to discuss requirements, developments
and challenges in this area.
Older People’s Voice Conference
Our third annual Older People’s Voice
Conference saw 60 residents take part on
6 March at Redburn Community Centre.
The community event was planned and
hosted by our Council’s Community
Learning and Development team in
partnership with older people across the
six localities.  The conference is a key
component of our Older People’s Voice
Participation Strategy to ensure our older
residents real life experience informs
policy planning.
Attendees enjoyed an afternoon tea
provided by Friends of Redburn and
discussed what has worked well over the
past year.  Our council’s WhatsApp
channel was highlighted as
improving
communication.  It is
being used to share
key service updates
and emergency
113

Page 114

Our Council Plan Progress Update – Year End 2025 to 2026  Page 18 of 67
communications to residents who may not
be on social media but are confident using
WhatsApp messenger.
Other themes discussed at the annual
meeting included:
• Ensuring older people’s voices are
heard, actioned and respected.
• Helping to shape the work of our
council.
• Addressing inequalities.
• Achievement through
intergenerational learning.
• Community participation.
• Information on elderly grants.
• Health and wellbeing (Including green
health) in localities.
Local groups attended from localities
across North Ayrshire, and these included:
Irvine Seniors’ Forum, Three Towns
Discovery Group, Age Well in West
Kilbride, Kilwinning Vintage Voices and
Watt Gardens Residents’ Group in Dalry.
Community Investment Fund
During the 2025 to 2026 financial year, a
total of £685,740 was awarded to
community projects across North Ayrshire
through the Community Investment Fund.
Overall, 14 projects received funding
across the localities. Some of these are:
• Beith Trust in Garnock Valley – funding
was awarded to upgrade the Beith
Astro 3G pitch to ensure its continued
safe use as a key multi-purpose
community facility.
• Impacts Arts in Irvine – for their
Community Canvas project to deliver
co-designed murals that provide
volunteering, skills development and
employment opportunities while
promoting wellbeing and reducing
inequalities.
• PRYDE in Kilwinning – for the
employment of a Community
Development Manager, part-time
community engagement staff and
associated building overheads,
enabling the delivery of a continued
and expanded programme of activities
within the hub.
• Cycling without Age in Largs - to
purchase a second trishaw. This will be
used alongside their existing trishaw
on the promenade, allowing their
volunteer “pilots” to take more people
on trips.
• Craufurd Simson Park in North Coast- a
community-driven initiative to develop
a safe and inclusive playground for
local residents. Group were awarded
50% of the total project costs and are
114

Page 115

Our Council Plan Progress Update – Year End 2025 to 2026  Page 19 of 67
seeking match funding for the
remaining 50%.
• Saltcoats Victoria Football Club - to
support Phase 1 of a planned upgrade
of the facilities at Campbell Park. This
includes a changing room upgrade
involving new modular units which
include changing for two teams,
modern showering facilities and an
officials’ changing room.
Third Sector
Co-design with third sector partners and
community members remains central. 
Partnerships are translating shared
priorities into early delivery and
investment, with stronger alignment
between prevention, community
wellbeing, employability and social
enterprise activity.
Money Max, a family-centred support
team focused on putting people’s needs
first by offering practical guidance,
advocacy and support tailored to
individual circumstances, was achieved
through partnership.  Our work with the
Third Sector Chief Officers group led to its
co-design and funding through the Child
Poverty and Early Intervention Fund.
This pilot service brings together TACT,
CHAP, Beith Trust, 1st Alliance Community
Bank and Right Options to deliver a
coordinated support across all of their
organisations. The service can help with:
• Reducing debt and improving financial
wellbeing.
• Benefit applications, banking options
and savings schemes.
• Building confidence, skills and
opportunities.
• Connecting people with the right
support services.
• Providing a safe, non-judgemental
space for guidance and development. 
Money Max has entered the delivery stage
with staff in post and joint programme
design underway.
Test It! is a new social enterprise
development programme designed and
delivered in partnership with North
Ayrshire’s Third Sector for North Ayrshire’s
Third Sector.  Building on research
undertaken by the Third Sector Chief
Officers Group, the programme is working
with a small cohort of aspiring community
and voluntary organisations to build skills,
confidence and understanding of social
enterprise within a peer support
framework. Mentoring and workshop
sessions are provided by Beith Trust and
Right Options, centring learning on real
experience of building a successful, locally
owned social enterprise. The five
successful organisations will receive start
up grants of between £3,000 and £9,500
to launch their idea, in addition to 1:2:1
coaching for organisations with the
potential to develop an early stage idea
further. Workshop delivery begins in April
2026 and the first cohort will test their
ideas over the remainder of the year.
Islands
Island Plans
The new five-year National Islands Plan
was launched on 24 February and is
supported by a £5.75 million package of
investment for island communities to
create jobs, strengthen local economies,
improve infrastructure, enhance
community resilience and
support the transition to
net zero.
The overarching
purpose of the Local
115

Page 116

Our Council Plan Progress Update – Year End 2025 to 2026  Page 20 of 67
Island Plans is to drive sustainable
economic development, build resilience,
support population attraction and
retention and advance our Council Plan
priorities and overall vision of a North
Ayrshire that is fair for all.  
In response to the publication of the
National Islands Plan 2026 to 2031 and
building on the effective and substantial
work to date, it is proposed that the North
Ayrshire Islands Programme progresses
work with island stakeholders, Elected
Members and across council teams to co-
develop refreshed and refined Local Island
Plans.  These will be aligned with our
Council Plan, Community Wealth Building
Strategy, the new National Islands Plan,
the Ayrshire and Highlands and Islands
Regional Economic Strategies and other
relevant policies, strategies and plans.  
Consideration will be given to developing
island investment plans that can be used
as a framework to maximise funding on
the islands.  It is intended they will
identify strategic island and priority capital
and revenue projects seeking external
funding, ensuring there is a co-produced
and co-defined project pipeline to
maximise investment opportunities for the
islands.
Island Investment
In partnership with the Scottish
Government’s Islands Programme, over
£800,000 is being shared over the
following three projects on Arran:
• £382,399 is going towards building a
new youth centre in Lamlash (Arran
Youth Foundations Youth Centre).
• £323,925 will be used to upgrade the
Brodick Hall Island Hub.
• £129,718 will help extend marine
infrastructure at Lochranza.
The programme backs the advancement
or establishment of projects that will help
local communities deliver the National
Islands Plan’s Strategic Objectives.
Community Planning
Our Community Planning team continues
to lead and support CPP and Locality
Partnership meetings, both online and
face-to-face.  They are facilitating the
rollout of the Locality Planning Review
recommendations, working closely with
the Scottish Government and other
national partners on key developing policy
areas, and leading a council-wide review
of community grants.
A Locality Communications working group
has been established to explore how social
media can be used more effectively to
promote the work of the CPP.  This
includes highlighting Locality Partnerships
(LP’s), publicising community events,
sharing success stories, supporting
engagement activities and promoting
available funding opportunities.  
Our CPP is maintaining close collaboration
with our council’s Spatial Planning team
on the development of guidance for Local
Place Plans and the update of Locality
Profiles.  To ensure sufficient time for this
work to progress and for resulting actions
to be embedded, the refresh of Locality
Plans has been rescheduled to 2026. 
Arts and Cultural Team
We have delivered a Place Partnership
with Creative Scotland which facilitated
new projects and initiatives in North
Ayrshire including two Artist
Residency Projects.  The
Harbour Arts
Centre works actively
to support local
artists and
116

Page 117

Our Council Plan Progress Update – Year End 2025 to 2026  Page 21 of 67
community organisation in the delivery of
art and cultural based events and
activities to the local communities.
English for Speakers of Other Languages
(ESOL)
People from all over the world are
improving their language skills through
our Big Class sessions.  Participants are
allocated a group based on their English
level to join with other learners.  The
programme is supported by our council's
ESOL team, which includes Community
ESOL tutors and volunteer tutors, through
the Connected Communities service.  
Ruslana, from Ukraine, attends the
sessions and said: 
“I like this class because it has helped me
to overcome the barriers in
communication with English-speaking
people.”
“The lessons give me confidence in
speaking and have helped me to gradually
learn new words.  I am starting to
understand English better by ear, and I feel
more comfortable in everyday situations. 
Valentina, also from Ukraine, didn’t study
English at school or university and said the
class has been great for developing her
language abilities due to the constant
support from our council’s tutors.
“My English is getting better and better,
and I would recommend the Big Class to
other people”. 
117

Page 118

Our Council Plan Progress Update – Year End 2025 to 2026  Page 22 of 67
Next Steps
All next steps noted within the Mid-Year
Progress report are progressing as
expected and included in the narrative
above or listed below:
We will update the CIF guidance which is
provided to applicants and strengthen the
checklist which assists Locality Officers
with decision making:  Guidance has been
drafted and will be shared with Locality
Partnerships following the Scottish
Parliamentary Election.
We will continue work with partners
across our council, TSI and KA Leisure to
understand how we can better attract,
support, recognise and retain volunteers
locally and improve the overall volunteer
experience:  We continue to work closely
with partners across our council, the TSI
and KA Leisure to share information and
publicise opportunities in ways which
make it easier for individuals to find
volunteering opportunities and
organisations to recruit volunteers.
---
Next Steps to be achieved by the end of
September 2026 unless otherwise stated:
• We will progress the next phase of our
Locality Planning 2.0 programme,
looking to strengthen our locality
networks.
• We will further develop the pipeline of
Community Asset Transfer projects to
increase the number of assets in
community ownership.
• We will work with KA Leisure to
develop the next phase of delivery of
the Wellbeing Alliance.
• Our Community Planning Partnership
will hold two training sessions in 2026
(August and December).  Invitations
will be extended to all partners,
internal colleagues and Locality
Partnership members.
• Locality Plan priority engagement is
ongoing with Plans due to be
considered by Locality Partnerships in
the autumn.
• The Participation Strategy will be
refreshed, supported by the upcoming
work with Scottish Community
Development Centre (SCDC) to build
staff and partner skills in engagement
and consultation by March 2027.
• We will launch engagement on
proposals for a Community Transport
initiative.
• We will refresh and relaunch the
Community Engagement Network
following our shared visioning with
partners.
• We will progress work with island
stakeholders, Elected Members and
across council teams to co-develop
refreshed and refined Local Island
Plans.  
118

Page 119

Our Council Plan Progress Update – Year End 2025 to 2026  Page 23 of 67
Case Study – She Shed – Dalry
The She Shed was opened in August 2023 and aimed to provide a supportive space for all
women in the community to gather, share and create. In 2025, to accommodate the
increasing number of attendees, the group moved to the Dalry Scout Hall.
With continued support from locality staff they have been able to form a committee and
become a constituted group with guidance and training offered on a regular basis. This has
allowed them to apply for further participatory budgeting funding as well as from the Dalry
Parish boundary trust to allow them to pay rent, plan activities and purchase resources to
acknowledge the variety of interests of attendees. The She Shed has developed into a
weekly hub for women from across the Garnock Valley who are welcoming and supportive
of each other. They have hosted open days, attended events to promote the project and
welcomed other partners to celebrate occasions with them such as Christmas and Burns
Day. 
The She Shed has worked well because there has been a positive impact on the lives of the
people who attend. The women who attend report that they have benefited from attending
the weekly sessions and found an improvement in their wellbeing. This has been achieved
through the commitment of the volunteers from the She Shed and other local partners and
their positive outlook towards partnership working. By collectively sharing information and
access to resources they have been able to develop a community space that promotes the
values and ethos of CLD, a safe and inclusive space for women to come together. At the core
of the work being delivered is women’s welfare regardless of their race, class, sexuality and
age. Their health and wellbeing is always considered and at the forefront when devising
activities and providing information. 
The She Shed has made a difference in the lives of women attending the group by reducing
social isolation and giving them a space to connect with others and learn new skills. As a
result of the She Shed, one member in particular has developed confidence to leave the
house on a regular basis and speak to other people. Another woman now has a day where
she has respite from her caring responsibilities. By attending the Shed she has the space to
take time for herself and relax and recharge. These are just two examples of many where
women’s confidence, health and wellbeing are being improved through community
engagement. 
119

Page 120

Our Council Plan Progress Update – Year End 2025 to 2026  Page 24 of 67
Case Study – Community Conversations – Irvine 
The purpose of the Community Conversations across the Irvine locality was to engage
residents, community groups and partners in meaningful dialogue to shape action around
four key local priorities: 
1. Supporting Skills and Work Opportunities 
2. Enhancing Mental Health and Wellbeing
3. Alleviating Poverty
4. Championing Green Health and the Natural Environment
The conversations were structured around the following themes: Poverty; Employability and
Skills; Mental Health and Wellbeing; and Green Health and Open Spaces. In total 454
participants attended Community Conversations between January and March 2026. The
findings will be used to create a new, inclusive and representative Irvine Locality 2026 to
2027 Action Plan.  Engagement sessions included: 
• Redburn Community Lunch hosted 84 residents to share food, ideas and
conversations about what matters most in their community.
• Fullarton ConneXions welcomed 55 residents to Café Solace community meal
provision, including four Alcohol and Drugs Partnership community groups alongside
volunteers from Recovery Café in Irvine. 
• Volunteer Rooms facilitated 39 participants from a range of community groups,
organisations, colleagues and CPP partners. 
• In total 149 of our children and young people took part in youth friendly
conversations across our primary schools and youth groups.  
The conversations were aimed to create accessible spaces for people to share lived
experiences, highlight barriers, and contribute project ideas that would directly inform
locality planning and future community development work. By gathering diverse voices from
across Irvine, the programme sought to ensure that community-led insight guided
decision-making and supported more inclusive, place-based approaches.
The Community Conversations worked well because the approach was designed to be
genuinely accessible, inclusive and rooted in the needs of our local people. Holding sessions
in familiar community spaces helped reduce barriers to participation and encouraged
residents to engage more openly. The informal, conversational style created a relaxed
atmosphere where people felt comfortable sharing their views and experiences. 
Strong partnership working also contributed significantly to the success of the activity. Local
partners (Independent and third sector partners, Health and Social Care Partnership, Police
Scotland, Scottish Fire and Rescue, NHS Ayrshire and Arran and Ayrshire College) helped
promote the sessions, brought additional knowledge of community dynamics, and
supported facilitation - helping to build trust and widen participation. Their
involvement ensured the activity felt collaborative rather than service-led.
A key factor in the success of the activity was the use of the online
platform Consul to collate and present the information gathered.
Consul provided an accessible digital space where community
120

Page 121

Our Council Plan Progress Update – Year End 2025 to 2026  Page 25 of 67
members could review emerging themes, contribute additional comments, and stay
informed about the process at a time and place that suited them. This blended approach -
combining in-person conversations with an online engagement tool - helped widen
participation, especially for individuals who could not attend sessions in person.
As a result of these conversations several key areas of focus were identified:
Mental health and
reducing poverty
The barrier of
transport Poverty pressures Community spaces
as lifelines
Supporting young
people
Mental health,
trauma and
recovery
Practical skills Green spaces matter  
These sessions were received positively: 
“A meaningful opportunity to have my voice heard.”
“Good chance to share our views with other like-minded partners.”
“Optimistic for the future to drive positive changes.” 
The next stages in the creation of the Irvine Locality Action Plan will involve defining
timelines, partners and expected outcomes, identifying pilots for quick implementation, and
establishing regular community voice forums.  We will ensure lived experience is embedded
in every stage. 
121

Page 122

Our Council Plan Progress Update – Year End 2025 to 2026 Page 26 of 67
Climate Change
To achieve net-zero by 2030.
Key Activities
Sustainable Energy
Solar Farms
Both council solar photovoltaics (PV)
developments at Nethermains and the
former Shewalton landfill site are fully
energised and generating renewable
electricity.  The solar farms are pioneering
and the first to be owned and operated by
a Scottish local authority.  The sites are key
to delivering our council's Sustainable
North Ayrshire Strategy and will earn
income for our council to help sustain
local services by selling the electricity
generated.
Some of the income from the solar farm
will be used to help with community
projects, addressing fuel poverty and
encouraging renewable energy projects at
a local level.
Community Energy Generation
Work is ongoing to identify further
low-carbon energy opportunities,
including potential community ownership
models and collaboration with local
industry to make use of excess heat. The
Community Renewable Energy Generation
Fund continues to be promoted, with nine
community groups supported since
February 2024. 
2030 Woodland: A Tree Planting Strategy
Delivery of North Ayrshire’s 2030
Woodland: A Tree Planting Strategy
remains a priority, with continued support
offered to community groups and ongoing
identification of suitable planting sites.
Since 2022 to 2023, 65,305 trees have
been planted across North Ayrshire
through a combination of council-led
projects and community-led initiatives. 
This exceeds the 2025 to 2026 milestone
target of 60,000 trees by 31 March 2026
and places the programme firmly on
schedule to achieve the overall ambition
of 108,000 trees by 2030.
A significant milestone was reached in
February 2026 with the completion of
7,000 trees planted at Annick Valley Park
in Irvine and in March, a new tree-planting
project commenced at Milgarholm Park,
delivered in partnership with local social
enterprise Eadah Enterprises and
environmental charity Woodland Wakeup. 
The project will see 1,600 trees planted
and includes strong community
involvement alongside an on-site
educational programme delivered by
Woodland Wakeup, helping to connect
local people with the environmental
benefits of woodland creation.
North Ayrshire 2030 Woodland Grant
Fund
The 2030 Woodland Grant Fund 2025 to
2026 was launched in October 2025 to
support not-for-profit community groups
and local organisations across North
Ayrshire.  The £25,000 fund was widely
promoted through multiple
communication channels and closed for
applications on 31 January
2026.  Two applications
were received, one has
been approved to
support a
small-scale
122

Page 123

Our Council Plan Progress Update – Year End 2025 to 2026 Page 27 of 67
tree-planting project within a primary
school, while assessment of the second
application is ongoing.
Community Participation
We continue to strengthen community
participation in climate governance
through a series of community climate
conversations held across our localities.  In
addition, the Climate Change Steering
Group maintains active engagement with
internal teams, external stakeholders, and
partners to support informed
decision-making on our journey to net
zero.
Area Based Scheme (ABS)
The ABS continues to make positive
progress, with resident engagement and
energy efficiency installations underway
on Cumbrae, Arran and at St Winnings in
Kilwinning.  Measures installed to date
include air source heat pumps, high
heat-retention storage heaters and solar
photovoltaic (PV) systems, supporting
households experiencing fuel poverty.
Engagement has also commenced with
homeowners living in properties in Beith
and Kilbirnie.  These homes have been
identified as more difficult to treat, and
where feasible the scheme will provide
external wall insulation alongside solar PV
installations.
In addition, for 2025 to 2026, the Scottish
Government confirmed the expansion of
the scheme to additional locations,
enabling further investment in electric
heating upgrades, cavity wall insulation
and solar PV.  The newly approved areas
include Kilbirnie, Beith, Irvine, Largs,
Saltcoats and Stevenston, with early
engagement in these communities
receiving a positive response.
ECO4 Flexibility (ECO4 Flex)
Our partnership with our ECO4
Flex-approved contractor has continued to
deliver improvements to homes across
North Ayrshire since May 2023.  They have
installed more than 167 energy-efficiency
and heating measures in 48 households
experiencing low income or vulnerability
to cold.  These works include air source
heat pumps, solar PV panels, loft and
room-in-roof insulation, internal wall
insulation, boiler replacements, first-time
central heating systems and thermostatic
radiator valves, securing over £1 million in
external funding.
Carbon Neutral Island (CNI) - Cumbrae
Construction work on Phase Two of the
CNI solar PV and battery storage project is
now underway on Cumbrae.  The aim of
the project is to install solar PV and
battery storage systems on 130 homes in
Millport to reduce carbon emissions and
address fuel poverty by enabling
households to generate and store
renewable energy.  Feedback from the
local community has been encouraging,
and the project is delivering wider
community benefits.  For example, as part
of the contractual commitments, one
supplier will fund the replacement of an
outdated defibrillator in Millport.
Climate Partnerships
Procurement
Through close joint working between
Corporate Procurement and the Business
Support and Development Team, local
suppliers are being encouraged and
supported to tender for
council opportunities. 
This approach has
delivered strong
results as, during
123

Page 124

Our Council Plan Progress Update – Year End 2025 to 2026 Page 28 of 67
the final quarter of 2025 to 2026,
contracts worth £490,000 were awarded
to local businesses.  This amounted to £32
million across the financial year,
demonstrating our council’s continued
commitment to retaining spend within the
local economy and building resilient local
supply chains. 
Sustainable Growth
The Recovery and Sustainability Project
has continued to deliver strong results,
consistently exceeding agreed targets
during 2025 to 2026.  The programme has
made a significant contribution to
economic recovery and environmental
improvement, supporting businesses
while accelerating progress towards net
zero.
Key outcomes delivered during the year
include:
• Five Green Inward Investments within: 
power generation; wind farm supply
chains; and circular economy/Waste. 
This will create over 100 jobs with
further opportunities expected.
• 12 feasibility studies looking at
business adoption of green
technologies or green power with
focus placed on solar energy, hydro
projects, waste and capital equipment.
• 1,212 tons co2e reductions seen
through interventions.  
• Over £500k energy savings.
• 11 businesses supported through
training provision.  
• 147 projected new jobs.  
• £2.4m external funding secured.  
124

Page 125

Our Council Plan Progress Update – Year End 2025 to 2026 Page 29 of 67
• 118 tonnes of waste diverted from
landfill.
• Business investment in six new charge
points.
Reducing Waste Sustainably
Maximising Reuse
Our council supports a circular economy
through partnership working with our
bulky waste reuse provider.  Between 1
April 2025 and 31 March 2026, 944
mattresses (24.3 tonnes) were collected
for reuse, reducing waste.
During the same period, 220 tonnes of
household furniture was collected from
across North Ayrshire and diverted for
reuse.  This activity supported 1,883
households to furnish their homes, while
delivering wider social and economic
benefits by employing 21 staff and two
volunteers.
Policy Development
Officers continue to work in partnership
with COSLA, SOLACE and the Scottish
Government through a national co-design
approach to shape new circular economy
policy including a revised statutory Code
of Practice for Household Waste Recycling.
This work forms part of Scotland’s
emerging Circular Economy and Waste
Route Map and will directly inform our
council’s future Zero Waste Strategy,
identifying further opportunities to
improve reuse and recycling. 
Recycling Performance
Our household waste recycling
performance remains strong.  Our
provisional recycling rate for Quarter four
(October to December 2025, calendar
year) is 48.2%, exceeding the phased
target of 46%, subject to final verification
by SEPA in the autumn.
For the 2024 calendar year (figures
confirmed one year in arrears), North
Ayrshire achieved a 53% household
recycling rate, placing our council 9th out
of 32 Scottish councils through the Local
Government Benchmarking Framework
and well above the national average of
44.3%.  This performance is delivered
while managing one of the highest waste
tonnages among the top-performing
authorities, highlighting both our strong
outcomes and operational scale.
We were recognised with the Most
Improved Performer Award by ASPE in
December (see A Sustainable Council
section below).
Climate Education
During 2025 to 2026, our Energy and
Sustainability Team delivered 58 climate
and energy learning sessions across 21
schools, reaching 1,509 pupils and
supporting practical climate action within
school communities.  
Schools and early years settings continue
to benefit from professional learning
delivered by the Learning for Sustainability
Education Officer, supporting staff to
develop confidence and practical skills in
outdoor learning and biodiversity.  This
ongoing programme helps strengthen our
children and young people’s connection
with nature and the environment.  Areas
of focus have included improving
biodiversity within school grounds,
exploring renewable energy and applying
outdoor approaches to literacy and
numeracy. 
Within our council
workforce, Carbon
Literacy training was
provided to 26
volunteer Climate
125

Page 126

Our Council Plan Progress Update – Year End 2025 to 2026 Page 30 of 67
Champions across our services, with
further engagement planned next year,
including training for Elected Members.
Community Climate Planning
Engagement with local communities
continues to support the development of
Community Climate Action Plans, with
officers attending community events to
discuss priorities, opportunities and
challenges.  We have been working with
groups across North Ayrshire to help
identify actions for further exploration,
with recent activity focused on
communities in Arran.
To help ensure wider participation, an
access controlled online platform is used
for structured engagement with
community groups. This has been
developed with support from our council’s
Geographic Information System Analytics
Team, enabling residents who are unable
to attend Climate Workshops to share
their views on climate action.
Community Volunteering
All planned sustainability and volunteering
activity was successfully delivered during
quarter four, including litter-picking,
tree-planting and youth engagement.
These activities form a core part of the
Irvine “Community Conversations”
programme.  As a result of this
engagement, the North Ayrshire
Community Planning Partnership has
supported a funding application of
£80,000 to the Scottish Government.  If
approved, this will enable delivery of a
summer roadshow, followed by
engagement sessions with local secondary
schools and partnership working with
community organisations.
Biodiversity Action
In partnership with NatureScot,
Streetscene is delivering nature-based
improvements, including the creation of
naturalised open spaces and wildflower
meadows to support wildlife and
pollinators.  Investment through
regeneration funding has enabled the
purchase of specialist equipment to
support habitat management and nature
restoration.  In addition, £27,500 of
regeneration funding is supporting
reconstruction works at Shewalton Pond,
with completion expected by
mid-summer, and 26 biodiversity
enhancement projects led by local
communities are being supported by the
Community Nature Restoration Fund.  
Our Libraries have supported
environmental awareness and reuse
through the delivery of 96 themed
activities, including Seed Library sessions.
Across parks and greenspaces, work
progressed on biodiversity and
conservation, including ranger-led citizen
science events, invasive species control
with volunteers, and ongoing
management of Phytophthora ramorum
(plant disease).  The Fish Pond project,
north of the old formal gardens woodland,
continues to progress at Eglinton Park,
with final works expected in 2026 to 2027.  
We continue our partnership working
through the North Ayrshire Biodiversity
Partnership.
Sustainable Travel
Active Travel
Our council has been
awarded funding from
the UK Government’s
Levelling Up Fund
(LUF) to improve
126

Page 127

Our Council Plan Progress Update – Year End 2025 to 2026 Page 31 of 67
active travel opportunities in the i3
Business Park in Irvine.  Existing footways
are being upgraded and new connections
created to provide better opportunities for
people to walk and cycle to and within the
business park.  The upgraded routes will
also add to the network of recreational
routes to the south-east of Irvine.
Some routes within the business park
have experienced vegetation
encroachment.  Path widening and
clearance works will improve safety,
visibility and accessibility for walking and
cycling.  Tree works have commenced on
Long Drive, with further works planned
along the River Irvine path.  Where
required, permissions have been granted
by Scottish Forestry, with replacement
native planting to be delivered in line with
our council’s Tree and Woodland
Management Policy and Tree Planting
Strategy to support biodiversity and
woodland connectivity.  
Other LUF supported Active travel Projects
include Riverside Way (Irvine), Strategic
Investment Route (River Irvine Path), and
Long Drive (Irvine) extensions.
Active Travel Routes – Completed in
Quarter Four:
• Route upgrades in Beith/Kilbirnie and
Largs. 
• Improvements at Blacklands
Recreation Ground. 
• Enhanced sections along Bannoch
Road (Irvine Road to Corsehill,
Kilwinning). 
• Pedestrian improvements between
Auchenharvie Road and Canal Street. 
• Vegetation clearance, new cycle stands
and general route enhancements. 
• Delivery of the Long Drive Active Travel
Route. 
• Completion of Links to Eglinton Phase
2 – Stage 1.
Active Travel Facilities:
Investment in supporting infrastructure
included:
• New e-bike infrastructure on Arran.
• Cycle parking installed at Eglinton Park
Community Garden.
• Additional cycle stands across key
locations.
Planning for Future Routes
Work continues to develop a pipeline of
active travel projects for future delivery
and funding.  This includes accessibility
audits, design and feasibility work for
routes across Arran, the mainland and the
islands, detailed design for National Cycle
Network crossing improvements, and
preparatory works for schemes at
Valefield Bridge (Kilbirnie) and Putyan
Burn (Dalry).
Public Transport Improvements
Enhancements to public transport
infrastructure during the period included
the installation of Real Time Passenger
Information (RTPI) signs across the North
Coast and Garnock Valley (subject to final
trunk road permissions), alongside Bus
Infrastructure Fund improvements such as
replacement shelters, strengthened bus
stops and accessibility reviews on the
Broomlands Busway.
Travel Smart
The Travel Smart
Programme continues
to support behaviour
change by
encouraging greater
127

Page 128

Our Council Plan Progress Update – Year End 2025 to 2026 Page 32 of 67
use of active travel and public transport,
helping to reduce carbon emissions and
promote a more sustainable transport
network.
Key activity this period includes:
• Targeted campaigns, workplace
engagement and community outreach
delivered through the Travel Smart
Programme and the mobile Trinity
Active Travel Hub.
• Guided walks, cycle sessions,
volunteer-led activities and practical
initiatives such as bike maintenance
classes.
• Support for workplaces to develop
tailored travel plans and improve
access to sustainable travel options.
• Promotion of active travel
opportunities through the Trinity Hub
social media channels.
These behaviour-change initiatives
complement our council’s wider
programme of active travel and public
transport infrastructure investment
outlined above.
128

Page 129

Our Council Plan Progress Update – Year End 2025 to 2026 Page 33 of 67
Next Steps
All next steps noted within the Mid-Year
Progress report are progressing as
expected and included in the narrative
above.  Next Steps to be achieved by the
end of September 2026 unless otherwise
stated include:
• We will continue to provide strong
leadership, engagement and
education to support our journey to
net zero, including climate education
and training for pupils and staff to
enable practical action on climate
change and biodiversity.
• More homes in priority areas will
benefit from low-carbon heating and
renewable energy, helping to cut
emissions and reduce fuel poverty.
• Community-led climate action and
volunteering will continue to improve
local environments, supported by the
Streetscene Team and partners
through environmental events,
wildflower meadow development,
regular litter picking and
neighbourhood improvement activity.
• Community-led tree planting will
continue in line with the 2030
Woodland Strategy, alongside
exploration of further collaborative
planting opportunities and larger-scale
woodland creation projects at
Montgomerie Park and Bartonholm in
Irvine.  This will support biodiversity,
nature restoration and increased
woodland cover. 
• Delivery of the Recovery and
Sustainability Project will focus on new
accelerator programmes and
increased support for business capital
investment to drive sustainable,
low-carbon growth.
• We will maximise the benefits of our
solar farms by supporting community
projects and developing new local
low-carbon energy opportunities.
• We will await the outcome of our
£80,000 Scottish Government funding
application to enable delivery of a
summer roadshow, followed by school
engagement and partnership activity
with community organisations. 
129

Page 130

Our Council Plan Progress Update – Year End 2025 to 2026 Page 34 of 67
Case Study – Solar PV Farms 
Introduction
Council declared a climate emergency in June 2019 and committed to achieving net zero
carbon emissions across the council estate by 2030.  Scottish Government’s net zero target is
by 2045, therefore our council has a role to play in supporting area-wide emissions to help
achieve the national target.
The Sustainable North Ayrshire Strategy is our council’s route map to net zero, with one of
the actions within the strategy to develop two solar PV farm projects on former council-
owned landfill site.
Background
During a budget setting meeting in March 2020, Council allocated funds towards the
development of two solar photovoltaic (PV) farms at Nethermains, Kilwinning and
Shewalton, Irvine.
The solar PV farms were planned to:
• Provide a substantial amount of clean, renewable energy to supply the local
electricity grid.
• Make a further positive contribution toe Council’s climate emergency declaration
commitment to be net zero carbon by 2030.
• Provide a localised economic activity and long-term productive use for the former
landfill sites that would be otherwise difficult to develop.
• Provide an annual net income that can be reinvested in North Ayrshire.
This one-off project was procured as an open tender to maximise competition and value for
money.
The contract commenced on 10 March 2023, and was split into three phases:
• Phase 1 – Design of Nethermains, Kilwinning & Shewalton, Irvine.
• Phase 2 – Build, Operation and Maintenance of Nethermains, Kilwinning. 
• Phase 3 – Build, Operation and Maintenance of Shewalton, Irvine.
Current Position
Construction of both solar farms is now complete.  
Nethermains solar farm was energised on 19 September 2025 and formally launched on 1
October 2025.  The 7.6MW solar aims to produce approximately 7,680MWh of electricity
per year.  
The 5MW solar farm at Shewalton was energised on 5 March 2026 and
aims to generate approximately 5,414MWh of electricity per year. 
130

Page 131

Our Council Plan Progress Update – Year End 2025 to 2026 Page 35 of 67
The energy generated from both sites is monitored remotely, and since energisation, more
than 5,100MWh of electricity (enough to power approximately 2,800 homes for a year) has
been generated.  The sale of the renewable energy from both sites is facilitated by a Power
Purchase Agreement with OVO Energy for the first year of operation.
In addition to utilising sites for renewable energy, which would have otherwise been left
vacant, biodiversity enhancements have been possible through consultation with NatureScot
and aligning with our council’s Tree Planting and Nature Network strategies.  On
Nethermains, 8,000 trees have now been planted on land unusable for solar, and a
landscape management plan to address invasive species on Shewalton is in development.
Next steps
As the solar farms enter the operation and maintenance phase of the project, our council is
looking towards a pipeline of potential large scale renewable energy projects, to further
reduce area wide emissions, support council services, and increase community participation
in the journey towards net zero in North Ayrshire. 
131

Page 132

Our Council Plan Progress Update – Year End 2025 to 2026 Page 36 of 67
A Sustainable Council
A Community Wealth Building Council that is efficient and accessible, maximising investment
and focusing resources towards our priorities.
Key Activities
Best Value Controller of Audit Report
North Ayrshire Council’s scheduled
Controller of Audit (Section 102) Best
Value report was considered by the
Accounts Commission in October, and
Council in December.  The findings are
extremely positive, highlighting a culture
of continuous improvement, a proactive
focus on addressing inequalities in our
communities and stating the council is “an
exemplar of how to do transformation
well”.  See ‘Audit, Inpections and
Accreditations’ section below.
2026 to 2027 Budget Consultation
We held our 2026 to 2027 Budget
Engagement between 6 November and 19
December 2025.  During this period we
consulted with our residents and
community groups on a number of
proposals across two themes:
1. Children and young people 
2. Other Council Services
In addition to community discussions,
1,125 responses were received across the
two themes (887 responses for “Children
and young people”, and 338 responses for
“Other Council services”) showing
considerable engagement with our
residents and community groups resulting
in informative feedback on the proposals.  
As with our previous budget consultation,
the proposals were grouped into themes
so that residents could respond to the
areas that mattered most to them,
minimising survey fatigue and ensuring a
higher completion rate.  Residents were
able to respond through an online survey
or a variety of mediums to avoid digital
exclusion and make the survey accessible. 
These included:
• Posters displayed in front facing
locations with QR codes linking to the
survey.
• Paper copies of the survey available
through front-facing locations.
• Completion via telephone via our
Customer Contact Centre.
• Community discussions.
To reach our young people, a young
person friendly version of the consultation
was carried out in face-to-face sessions
with school pupils, young people with
disabilities, the North Coast Youth Forum,
the annual North Ayrshire Youth
Conference and North Ayrshire Joint
Champions Board Conference.    This
included listening to care experienced
residents.
Engagement feedback was analysed,
informed the budget proposals and
accompanying Equality Impact and
Children’s Rights Impact Assessments
(ECRIAs), all of which were presented to
Council on 11 February 2026 in advance of
the budget meeting of Council. 
At a Council meeting on 25 February, our
2026 to 2027 budget of £485 million was
approved.  The budget included
several key investment
and policy decisions:
• £1.36 million
reallocated from
132

Page 133

Our Council Plan Progress Update – Year End 2025 to 2026 Page 37 of 67
the i3 Energy fund to support the
development of a new council-owned
renewable energy project.  
• £276,000 added to strengthen work
aimed at reducing child poverty.  
Equality and Children’s Rights Impact
Assessments (ECRIAs)
Extensive support was provided to
services completing ECRIAs on Budget
proposals, this resulted in 14 Screening
Forms (not requiring a full assessment)
and eight Full Impact Assessments shared
with Elected Members in advance of the
Council budget meeting.
Assessments were informed by our
Council’s extensive Budget Consultation
Exercise, which included survey questions
on both the perceived impact on people
with protected characteristics and other
elements of our ECRIA.  Optional personal
demographic information was completed
by survey respondents to help provide a
fuller understanding of potential impacts.  
Inline with legislation, ECRIA's are also
completed for non-budget related
activities.  Recently this has included the
completion of Screening forms for an
internal Alcohol, Drugs and Solvent
Misuse Policy, the relocation of Customer
Services from Bridgegate House to
Cunninghame House as part of our estate
rationalisation and The Youth Participation
Strategy.  Once complete, all are uploaded
to our website.
British Sign Language
We continue to support the Pan-Ayrshire
British Sign Language (BSL) Advisory group
to progress the BSL Plan.  Four officers
from across our council completed a BSL
introductory course, including an
employee from our Sensory Impairment
Team who has direct interaction with our
BSL Communities.  Employees will be
attending more advanced courses during
the autumn of 2026.
Following attendance at the launch of the
Scottish Government Inclusive
Communication Toolkit, planning is
underway to consider how the key
elements can be adapted across our
council.
Property Rationalisation
Continuing our ambition of rationalising
our council’s non-domestic property
portfolio, construction works began on 5
January to create a new customer service
centre on the ground floor of
Cunninghame House.  As part of property
rationalisation approved by Cabinet in
March 2024, further projects will be
completed in 2026 to 2027 including:
• The vacation of Quarry Road, Trinity
Church and Galt House to merge
operations into Cunninghame House.
• The vacation of Bridgegate House and
subsequent consideration for future
uses as part of Irvine Town Centre
regeneration work.
Housing and Regeneration Funding
We have been working closely with the
Scottish Government and our Registered
Social Landlord partner, Trust Housing
Association, to secure support from the
Scottish Government‘s Key Workers Fund. 
This funding will enable the purchase of
homes on Arran to help meet the housing
needs of key workers.  
We have also successfully secured a
£1.838m investment from
the North Ayrshire
Ventures Trust (NAVT)
and £1.169m of
Regeneration
133

Page 134

Our Council Plan Progress Update – Year End 2025 to 2026 Page 38 of 67
Capital Grant Funding (RCGF) to support
regeneration improvements within the
Bourtreehill Village Centre.
Annual Rent Consultation
Our Annual rent consultation was carried
out between 5 December 2025 and 16
January 2026 and attracted the highest
number of responses for this survey. 
Tenants were sent information regarding
two potential rent increase options.  The
first option of an average 3.84% increase,
equivalent to £3.50 per week, was
favoured by 75% of respondents and
approved by Council in February.  It will
help maintain current investment levels in
priority areas including home
improvements, sheltered housing,
developing new affordable housing, and
buying back former council houses.    As
with all of our consultations, tenants
without access to the internet were able
to participate via their local housing office
or library or could request a survey form
be posted out to them with a free return
envelope provided.
Regeneration External Funding
Our Vacant and Derelict Land Fund
allocation for 2025 to 2026 was just over
£1.5m.  With this funding, proposals have
been developed for Lochshore and
Portland Road, Irvine.  Supporting our
Vacant and Derelict Land Strategy, these
areas were highlighted for development
following an examination of cross-service
project expressions of interest.
Via the UK Shared Prosperity Fund
(UKSPF), six council-led projects with a
value of £376,535 are currently underway
and three have been completed.  In
addition, 24 local groups shared £397,000
which included £250,000 of UKSPF
support.
The Irvine Pride in Place (previously Plan
for Neighbourhoods) regeneration plan
was approved by the UK Government in
March 2026.  Year one will see the
following projects progress:
• Bridgegate Enhancement.
• Station Square / Underpass.
• Town Dressing.
• Community Fund.
• Murals.
Delivery of the plan is being supported by
our officers and the recruitment of a new
Irvine Neighbourhood Board Chair is
underway.
The Pride in Place Impact Fund (PiPIF)
(announced by the UK Government in
September 2025) will see £1.5m of capital
funding invested in North Ayrshire over
the next two years.  The PiPIF will provide
immediate support, complementing the
Pride in Place Programme by enabling the
development of community spaces,
supporting the regeneration of our high
streets and public spaces.
The Three Towns has also been selected
for the Pride in Place Programme and
recruitment of a Neighbourhood Board
Chair is ongoing 
On 2 December 2025, Cabinet agreed that
PiPIF funding would be aimed at areas
that have not previously benefited from
Pride in Place funding or the previous Plan
for Neighbourhoods funding.  PiPIF
funding will be assigned via one of the
three following ways:
• A direct allocation to
participatory
budgeting in
eligible localities.
134

Page 135

Our Council Plan Progress Update – Year End 2025 to 2026 Page 39 of 67
• A community funding allocation and
direct council-led delivery of projects
informed by the Regeneration Delivery
Plan.
• Associated strategies and plans.
Smart Infrastructure Pilot
The Smart Infrastructure Pilot Project
(SIPP) has moved from initial installation
into early use.  A workshop was held with
key partners to build a shared
understanding of how the technology
works and how it can begin to support
local services. In March 2026, a Data
Protection Impact Assessment was carried
out for the new public Wi-Fi network,
which was approved allowing work to
progress towards a planned launch in May.
The project’s digital platform is now live
and providing real-time insight into
footfall in addition to noise and weather
data.  Teams working in regeneration,
tourism and public safety are already
using the data to inform their work and
are embedding the technology into
routine activity to support the delivery of
the Great Harbour project.
Our Digital Infrastructure and Connectivity
plan together with accompanying
guidelines is now complete with a final
learning session scheduled early in the
next financial year.  This will help inform
future digital infrastructure investment
decisions enabling our Transformation
team to work with other services and to
determine opportunities and align with
the Ayrshire Growth Deal Building Digital
Capital project.
The Ayrshire 5G Innovation Region (5GIR)
programme was awarded additional
funding of £400,000 bringing the total
value of the programme to £4.4m. 
Completed in March 2026, the
programme delivered a realised Gross
Value Added impact of £7.8m evidencing
strong place-based impacts of better
digital connections for the local economy. 
Enabling further investments in regional
connectivity, the programme achieved the
following:
• Engagement with more than 220
stakeholders.
• Delivery of 107 learning events.
• Support for 18 Small to Medium size
Enterprise grant-funded projects.
• Deployment of 25 advanced wireless
network solutions.
• Upskilling of over 200 individuals.
A key outcome of the 5GIR programme
has been the creation of a shared
approach to developing Ayrshire’s digital
economy.  This approach supports the
Ayrshire Digital Economy Framework and
helps build the skills, infrastructure and
partnerships needed to strengthen digital
capability in our localities.  Following
changes to how the Regional Economic
Strategy is being delivered, work has
moved away from producing a separate
digital masterplan and is now focused on
developing a practical roadmap for the
Ayrshire Digital Economy Ecosystem
(ADEE), directly aligned with and
supporting the Regional Economic
Strategy. 
A commitment to long-term collaboration
(through to 2030) has been put in place
with ADEE partners providing strong
infrastructure for the governance and
delivery of future investment and
innovation activity across
Ayrshire.
Our journey with
5GIR is now
135

Page 136

Our Council Plan Progress Update – Year End 2025 to 2026 Page 40 of 67
informing the Ayrshire Growth Deal
Building Digital Capital business case
which will focus on digital infrastructure
and private sector leverage.  
Maximising our Assets
Improvements to our play facilities are
ongoing by our Streetscene team.  A large
focus has been on accessibility
improvements both for accessing the
facility and when using the play
equipment – this has been facilitated by
capital funding from the Scottish
Government.
Play facilities in coastal areas are in
development and improvements at Irvine
Beach Park are well underway including a
skate park, cycle pump track and play
park.
A review of our existing assets is ongoing
with new replacements being made where
possible, as well as working with our
communities to redistribute older assets
to libraries, community centres or schools
bringing these back into use.  For example,
benches from Millport were gifted to local
community groups. 
136

Page 137

Our Council Plan Progress Update – Year End 2025 to 2026 Page 41 of 67
Workforce Development
The Staff Promise Conference was held in
January with 81 employees, partners and
10 care-experienced young people
attending. Young people from the
Champions Board presented the What
Matters to Us priorities and challenged
practice. 
The e-learning module on Corporate
Parenting went live and is mandatory for
all council staff to understand their
responsibilities around supporting care
experienced young people.
We are supporting employees from the
Community Learning and Development
service to undergo professional
qualifications in partnership with the
University of the West of Scotland. This
helps to improve the quality of the
support we can deliver to community
members and organisations. 
Climate Change Connected Leadership
Conference
The Connected Leadership Conference
enables senior officers to share best
practice to deliver the priorities of our
Council Plan.  A Connected Leadership
Conference on Climate Change was held
on Monday 19 January at Saltcoats Town
Hall.  Our Chief Executive, Executive
Director for Place, Head of Sustainability,
Transport and Corporate Property, and
Senior Manager for Sustainability provided
updates and led valuable discussions.
Following this, a Chief Officer Leadership
Team session on climate change was
delivered in March.  The aim of the
session was to transform the discussions
at the Leadership Conference into specific
measurable actions that could be taken
forward by defined officer leads to ensure
sustainability in council services.
A Great Place to Work Event
On 25 November 2025 we hosted our
second ‘Great Place to Work’ event which
was attended by over 400 employees from
several council areas.  Over 20 information
stalls were available on the day and were
hosted by a mix of council representatives
and partner exhibitors.  
A Breastfeeding Friendly Employer
Our council is now a Breastfeeding
Friendly Employer.  We have joined the
Breastfeeding Friendly Network which is a
UK-wide scheme that looks to empower
mothers by raising awareness of their
rights under the Breastfeeding etc. 
(Scotland) Act 2005 and the Equality Act
2010.
Living Wage Employer
Our council has paid the real Living Wage
for the last 14 years and implemented the
May 2026 increase six months early in
October 2025.  The increase of £0.85 from
£12.60 to £13.45 positively impacts 796
council employees.   
137

Page 138

Our Council Plan Progress Update – Year End 2025 to 2026 Page 42 of 67
Our Transformation Programme
Our current Transformation Programme was approved in 2023 and developed alongside our
Council Plan 2023 to 28.  The programme being delivered by our council has been
progressed around the key priorities of our Council Plan, driving change and transformation,
using technology and innovation where possible to deliver efficient services to help address
the financial challenges facing our council.  Through embedding a culture of continuous
improvement, crucially the delivery of our Transformation programme can protect the
services we provide to our residents. This section provides an update on projects that have
reached particular milestones in this period to enable focussed scrutiny.
Digital Workstream
Our Digital Working Group continues to develop key digital projects agreed as part of the
national transformation project teams for Housing, Waste, and Fleet Management.  This
includes strategic activity across our council and nationally through the Scottish
Government, Improvement Service (IS), SOLACE and Digital Office.  To date the following
progress has been made:
Parents Portal: This is the national online platform that allows parents and carers to
communicate digitally with schools and access a range of services.  All secondary schools
were live by the end of February, with cluster primary schools on track to be fully rolled out
by the end of the 2025 to 2026 school session.  The roll-out is making strong progress,
particularly through the successful move to digital report delivery.  To date, 70% of Progress
and Achievement Reports have been issued digitally by schools currently using Parents
Portal.  Training for Education Business Assistants was completed in February, with two
additional catch-up sessions to follow. 
Artificial Intelligence: Following the approval of the Generative AI Policy by Cabinet in
September 2025, providing clear guidance for staff on the appropriate use of this
technology, a trial is currently underway until July 2026 using a licensed version of Microsoft
Copilot to test additional functionality.   
Digital Economy:  This looks to shape North Ayrshire’s digital future through the Digital
Infrastructure and Connectivity Plan.  The work on the Digital Connectivity Procurement
Framework provided valuable learning, which is now informing the Building Digital Capital
programme and supporting a more effective delivery approach.  Regionally, our partnership
through the Ayrshire 5G Innovation Region has progressed, with a new Memorandum of
Understanding extending collaboration to 2030, securing long-term commitment to digital
innovation, and providing a strong legacy beyond the current 5G funding cycle. 
Digital Inclusion: Partnership working between libraries, CLD and specialist
organisations continues to strengthen digital inclusion across North
Ayrshire.  Targeted support for people with sight impairment has
expanded through collaboration with Triple Tap Tech, alongside a
wider programme of Device Advice, Coding Clubs, Computer Buddy
138

Page 139

Our Council Plan Progress Update – Year End 2025 to 2026 Page 43 of 67
Support and Community Learning and Development provision.  Together, this coordinated
approach delivered 53 digital learning sessions, supporting 192 adults and children to build
skills and confidence, with additional capacity provided by Digital Volunteers. 
Blue Badge Scheme for Disabled Parking: Progress has also been made on the application
process, with a feasibility study now complete and due to be reported to SOLACE in April
2026.  Alongside this, a Digital Maturity Assessment led by the Digital Office is underway,
helping us to better understand our current digital position and shape a future-focused
digital strategy.
Irvine Locality Property Review
The Irvine Locality Review continues to be progressed as part of the Land and Property
workstream.  The main purpose of the review is to rationalise our council’s property estate
in alignment with our strategic objectives.  
Phase 2 works now completed/ongoing:
• Works have completed on the new Training Suite at Cunninghame House which is now
operational.  
• Work commenced on Customer Service Centre with expected completion in May 2026.
• Work commenced on construction changes at Quarry Road with completion now
expected by end of June 2026.
Phase 2 works are ongoing with a review of the remaining localities and land being
undertaken: 
• A three-year plan is underway to review the remaining five localities across North
Ayrshire.
• Service areas have been consulted regarding land requirements and commenced
mapping of land areas with workshops now taking place and expected completion in
August 2026.
Commercial Property
The Commercial Property Workstreams vision is of a more efficient property portfolio across
three themes.  Progress across each workstream includes:
Maximise occupancy from the current estate portfolio 
Following the transfer of the commercial estate to the Property Management and
Investment team in April 2025, a comprehensive review was undertaken to improve
performance, maximise income and support Community Wealth Building.  A programme of
targeted actions has stabilised the estate, improved occupancy and rental
income, and strengthened management and oversight arrangements. 
These improvements provide a stronger platform for sustainable,
long-term growth of the commercial portfolio.
139

Page 140

Our Council Plan Progress Update – Year End 2025 to 2026 Page 44 of 67
Actions taken to date include:
• Repossession of multiple units abandoned by tenants.
• Active remarketing of vacant and under-used assets.
• Earlier engagement with tenants on rent arrears.
• Alignment of rental levels with market conditions.
• Introduction of improved monitoring, reporting and annual review arrangements.
These actions have delivered a 0.57% increase in occupancy and a 13.75% uplift in rental
income over the past 12 months, while improving visibility of performance and enabling
earlier intervention where issues arise.
Maximise opportunities from Economic Development, Growth & Regeneration and
Ayrshire Growth Deal investment (existing projects)
The following activities have been progressed to maximise the opportunities from
investment: 
• i3 Flexible Space, Irvine: The Ayrshire Growth Deal programme has provided modern
commercial industrial property with the completion of one 18,180 sq.  ft (1,689m2) unit
as part of the i3 Flexible Space project in Irvine.  The unit is currently being marketed for
occupation, with submissions under assessment.
• Portland Rd.  Land Sale:  Legal Services have been instructed to conclude missives of a
partial land sale, following Cabinet approval.  Regeneration Services will undertake cross
service engagement to identify options for the remaining land.
Develop proposals for new investment and securing Return On Investment (ROI) (future
projects)
• An award for the Levelling Up For Ayrshire - Commercial and Low Carbon Infrastructure
under the Levelling Up Fund (LUF) round three of £17.4m was secured from the UK
Government.  Informed by market feedback, the North Ayrshire proposal aims to address
market failure in the delivery of new energy efficient commercial property alongside the
provision of associated low carbon infrastructure at key employment areas in Irvine.
These funds are further supported by a successful award of £890,990 from the Scottish
Government’s Vacant Derelict Land Investment Programme (VDLIP).  The Irvine
investment concentrates on Kyle Road, Annickbank and i3 sites.
The following activities have been progressed:
• Kyle Rd Phase 2, Irvine: Following additional design work, the tender
pack is currently being finalised and expected to be issued in
April 2026.
140

Page 141

Our Council Plan Progress Update – Year End 2025 to 2026 Page 45 of 67
• Annickbank Innovation Campus, Irvine: The tender process has recently been
undertaken and a contract award is in progress.
• i3 Flexible Space Phase 2: Design work is currently being finalised to support a
tender issue in Spring 2026 for the construction of a new industrial building.
Nethermains and Shewalton Solar PV Farm
The 7.560MW Nethermains Solar Farm has now moved into the Operation and Maintenance
Phase following the works completion certificate being issued in January 2026.  A tree
planting exercise was also completed in January with a total of 8,050 trees planted, further
supporting our Tree Planting and Nature Network strategies.
A gas pumping trial was successfully held on the Nethermains site throughout January -
February 2026.  The trials were successful with a decision pending on whether to proceed
with the gas recovery works.
The 5.344MW Shewalton Solar PV Farm was commissioned on 6 March 2026.  An official
opening is expected to take place at a later date subject to Scottish Government availability.
An energy sales contract is in place for both sites for one year with the option to review and
extend for a further two years. 
Waste Services
Special Uplifts: Following updated Persistent Organic Pollutants Regulations and new
guidance issued by the Scottish Environment Protection Agency (SEPA), we were required to
introduce a new Waste Upholstered Domestic Seating (WUDS) to be collected and managed
separately for items such as sofas, sofa beds, chairs, stools etc.  Since the introduction of the
new process in September 2025, over 6,200 customers from Arran, Cumbrae and the
Mainland have placed special uplift orders successfully using the new form.  
In-Cab Devices: To further support service efficiency, a decision was taken to extend the use
of in-cab devices to additional service areas, including Bulky Uplifts and Bin Deliveries in
2026.  A pilot commenced in March 2026, with targeted vehicles scheduled to receive
devices between May and June 2026.  The In-cab devices provide collection crews with
real-time access to up-to-date work instructions, with completed tasks automatically
updating back-office systems enabling faster service updates for customers, reducing
paperwork, and improving coordination between drivers, team managers and the Waste
Management team.  Overall, the devices support a more efficient, reliable and
customer-focused waste and recycling service.
Collection Frequency Change: As part of the 2026 to 2027 budget-setting, Council agreed to
change the collection frequency for the purple and blue recycling bins on the
mainland and Cumbrae from three-weekly to four-weekly, to better reflect
service demand.  Planning for the revised recycling collection
arrangements is currently underway, with implementation scheduled
for October 2026 and supported by a comprehensive public
communication campaign to ensure residents are fully informed.
141

Page 142

Our Council Plan Progress Update – Year End 2025 to 2026 Page 46 of 67
DEFRA Packaging Extended Producer Responsibility:  Work has commenced in North
Ayrshire to support the UK Government’s Packaging Extended Producer Responsibility
(PEPR) initiative, which was introduced in April 2025.  This aims to shift the financial burden
of packaging waste away from councils and onto the producers who create it.  This
represents a major structural change in how waste services are funded and will further
benefit North Ayrshire residents by providing:
• Cleaner streets and communities, as producers will fund better recycling and waste
management, reducing litter and landfill reliance
• More reliable and improved recycling services, as North Ayrshire Council will receive
dedicated funding to enhance household packaging collection and disposal.  
• Fairer system for residents, as businesses rather than local taxpayers will cover the
full net cost of dealing with packaging waste.  
• Less waste and more sustainable packaging, as producers are incentivised to design
recyclable, reusable and lower impact materials, benefiting the local environment.
Digital Waste Tracking:  The introduction of a requirement for all UK councils to utilise the
new Digital Waste Tracking System voluntarily from April 2026 will become mandatory from
October 2026.  This requires our council to record all waste movements electronically in the
national system.  It includes waste collected from our weekly waste collections from
households as well as waste from businesses.  The new Digital Waste Tracking system will
benefit our residents by helping to reduce fly-tipping and illegal waste activity, as electronic
records make it harder for waste to be disposed of unlawfully.  Improved real-time data will
strengthen environmental protection by allowing issues to be identified and addressed more
quickly, while increased transparency will provide clearer assurance about where waste goes
and how it is managed.  Overall, digital reporting will streamline processes and reduce
errors, supporting more efficient, reliable and higher-quality waste and recycling services for
local communities.
Decarbonisation of Fleet
The Decarbonisation of Fleet project is making steady progress, with 83 electric vehicles
(EVs) now in operation from the 397 vehicles originally identified as suitable for
replacement.  A further 28 EVs are expected to be purchased by the end of 2026, bringing
the total to 111.  To support this transition, 47 workplace chargers (89 sockets) have been
installed across North Ayrshire, with work underway to add a further eight chargers (16
sockets) in the coming months.  In addition, the Pan-Ayrshire Electric Vehicle Infrastructure
Fund (EVIF) project is expected to award its contract in April 2026 and will deliver over 300
public EV chargers across Ayrshire, including 106 in North Ayrshire, significantly
strengthening local charging infrastructure. 
142

Page 143

Our Council Plan Progress Update – Year End 2025 to 2026 Page 47 of 67
Our Workforce Strategy 2024 - 2028
The Workforce Strategy 2024–2028 is aligned to the Council Plan and the Medium-Term
Financial Outlook, setting out how the workforce continues to support delivery of our
council’s priorities within the context of available resources. During 2025 to 2026, strong
progress has been made across all four themes of the Strategy, with key action highlights set
out below.
Theme 1 Embedding workforce planning
Workforce Plans
All services have workforce plans in place which are reviewed on a six-monthly basis. These
reviews ensure workforce plans remain live, responsive documents informed by business
demand, PESTLE analysis, change planning and succession considerations. 
During 2025 to 2026, workforce planning has become increasingly embedded as a core
leadership responsibility, with clear ownership at Head of Service level and consistent review
cycles across Directorates. Workforce planning activity is now clearly aligned to service
redesign, vacancy management, recruitment control and wider transformation activity,
supporting delivery of our Council Plan priorities.
Development Interventions
Rather than standalone training events, workforce planning capability has been
strengthened through ongoing engagement between HR and Services. Six-monthly
workforce planning sessions, supported by a refreshed template and clearer guidance, have
improved consistency, focus and quality of planning discussions. 
Integration with Transformation
Workforce planning is incorporated into transformation programmes to consider workforce
benefits, resource and impact.
Workforce Strategy actions and performance measures are tracked through our corporate
performance management system, strengthening transparency and governance.
Theme 2 Enhancing workforce information
Workforce Information Toolkit
A digital Workforce Information Toolkit has been developed to provide managers and senior
leaders with access to live workforce data to support effective planning and decision-
making. The Toolkit has been rolled out within a number of Services, with wider council
adoption underway during 2026 (see case study below).
Workforce Strategy Performance Dashboard
The Workforce Strategy has a series of performance indicators measured on a regular basis. 
These indicators have been included in a Workforce Strategy Performance
Dashboard offering a user-friendly overview to support workforce planning.
The dashboard brings together people data held within corporate systems
and presents it in a visual format to support monitoring of workforce
performance and trends over time. These indicators include, but not
143

Page 144

Our Council Plan Progress Update – Year End 2025 to 2026 Page 48 of 67
limited to, data relating to headcount/ Full-Time Equivalent (FTE), gender, employee
turnover, absence, average age of employee and time to recruit. 
Theme 3 Building workforce capacity
Digital Skills Survey
A council-wide Digital Skills Survey was undertaken to assess digital confidence and
capability across the workforce. Results demonstrated strong digital foundations, with
identified development needs in document collaboration, troubleshooting and information
sharing. A structured action plan was put in place to address these areas through targeted
development activity, practical support and increased awareness of learning resources.
Agile Workstyle Wellbeing Survey
Employees operating an agile workstyle were surveyed to understand the continued impact
on wellbeing and productivity. Findings were positive across recruitment and retention,
engagement, collaboration and work life balance. An associated action plan was put in place
to support continuous improvement and sustain the benefits of agile working.
Apprenticeships and Grow Your Own Programmes
Apprenticeship pathways continue to play a key role in building workforce capacity and
supporting the future talent pipeline. During 2025 to 2026, Modern Apprentices and
Graduate Apprentices have been recruited and supported across a wide range of services,
with strong links to schools, colleges and universities. Services have also progressed grow
your own approaches and succession planning activity - supporting skills development,
retention and workforce sustainability.
Theme 4 Health, Safety and Wellbeing
A broad range of health and wellbeing activity has continued throughout the year,
coordinated through the LiveWell programme. This includes wellbeing courses, workshops,
physical activity sessions and health checks, promoted through corporate communications
to maximise accessibility.
Occupational Health provision continues to support staff wellbeing, early intervention and
sustained attendance, providing clinical advice, management referrals and pre-placement
screening. Promotion of supportive policies and guidance remains a key focus to ensure
managers and employees are aware of available support.
Health and Safety activity remains embedded across our council, with ongoing monitoring
and reporting of RIDDOR incidents, violence and aggression trends and proactive
engagement with services. Health and Safety Planning Groups and the Corporate Health and
Safety Group provide oversight, assurance and opportunities for shared learning and
continuous improvement.
Summary
Overall, delivery of the Workforce Strategy during 2025 to 2026 has been
strong, with actions largely on target. This provides a solid foundation
for sustaining workforce resilience, capability and wellbeing as our
council moves into the next phase of delivery in 2026 to 2027.
144

Page 145

Our Council Plan Progress Update – Year End 2025 to 2026 Page 49 of 67
Audits, Inspections and Accreditations 
Best Value Controller of Audit Report
North Ayrshire Council’s scheduled Controller of Audit (Section 102) Best Value report was
considered by the Accounts Commission in October, with the Commission’s findings
published on 28 October and considered by Council in December.  The findings are
extremely positive, highlighting a culture of continuous improvement, a proactive focus on
addressing inequalities in our communities and stating the council is “an exemplar of how to
do transformation well”. 
Best Value is a statutory duty as set out in the Local Government (Scotland) Act 2003 and
applies to all public bodies in Scotland.   Its core purpose is to ensure good governance,
effective use of resources and continuous improvement in order to deliver better outcomes
for our communities and residents. 
A new annual Best Value Thematic Approach was introduced in 2023, where a specific
theme agreed by the Accounts Commission is audited across all local authorities in Scotland. 
As part of this new approach, once every five years each local authority is the subject of a
Controller of Audit report, also known as a Section 102 report.  This summarises recent Best
Value Audits on behalf of the Accounts Commission who then publish findings which may
include recommendations to take forward. 
To support Best Value, our Performance Management Strategy (PMS) 2023-2028 October
2025 refresh was approved by Cabinet on 2 December.  Our PMS, which focusses on
delivering better outcomes for our people, was updated in line with the Accounts
145

Page 146

Our Council Plan Progress Update – Year End 2025 to 2026 Page 50 of 67
Commission’s Direction 2024 (effective as at 1 April 2025) and the newly introduced
Corporate Fraud Offence Act.  Innovatively, the strategy is now specifically designed as
training reference material for managers.  It provides a detailed information on determining
statuses to ensure consistency when demonstrating Best Value and helps maintain our
culture of continuous improvement.
Food Standards Scotland (FSS) Food Law Enforcement Actions Audit 2025 to 2026
A recent Food Standards Scotland audit has praised our council for its strong approach to
food safety and enforcement across local food businesses.  The review looked at how we
carry out inspections, handle enforcement action, and ensures high standards in shops,
restaurants and other food premises.  Inspectors found that our council has clear policies,
well-trained officers and reliable systems in place to protect the public. 
More than 2,000 food safety visits have been carried out since 2022, and when formal
notices were issued, they were found to be proportionate, clearly written and effective in
improving conditions.  The audit also highlighted our commitment to consistency, with
regular staff training, internal checks and annual sampling programmes targeting higher-risk
foods.  No enforcement action has been required as a result of food sampling in the past
three years.  
The report did identify areas where improvements are needed, particularly around the
accuracy of data reported to the Scottish National Database (SND).  While our council’s own
records are robust, not all information was transferring correctly to the national system.
Work is already underway to strengthen the way data is checked, mapped and submitted,
and our council has updated its internal procedures to prevent errors in future.
Overall, the audit provides reassurance that food safety in North Ayrshire remains strong. 
Our enforcement work was judged to be effective, timely and appropriate, and the service
continues to prioritise public protection.  We are already taking steps to strengthen data
accuracy and will use the audit findings to continue improving performance in the months
ahead.
146

Page 147

Our Council Plan Progress Update – Year End 2025 to 2026 Page 51 of 67
Dalry Early Years Centre
Dalry Early Years Centre has been praised by the Care Inspectorate for creating a warm,
nurturing and safe environment for young people.  Following an unannounced two-day
inspection in September 2025, inspectors praised the strong relationships between staff,
children and their families, high quality learning experiences and effective support for
individual needs.
Some of the findings included:
• Children were safe, secure and emotionally supported.
• Children's individual needs were well understood.
• Children who required additional support received timely and effective intervention.
• Children experienced rich and varied play opportunities indoors and outdoors.
• Staff were warm, respectful and purposeful.
• Indoor and outdoor spaces were thoughtfully arranged to promote independence.
• Leadership was strong and improvement-focused.
The Inspection Report also recognised the centre’s positive leadership and commitment to
continuous improvement, ensuring children benefit from a supportive and engaging start to
their learning journey.
Learning Places Scotland Awards
We have been awarded three prizes at the recent Learning Places Scotland Awards. The
awards celebrate excellence and achievement in the education sector across Scotland, with
categories recognising people, projects and partnerships that help to make a lasting impact.
Marress House won the Early Learning and Childcare Award and was Highly Commended in
the Refurbishment of the Year award.  The former tax office, transformed into a modern and
welcoming facility which opened doors in August 2024, is also home to our council’s Public
CCTV and Concierge Service and features a training suite which will be used to enhance the
skillset of the Early Years workforce across North Ayrshire.  In the Early Learning and
Childcare category, the judges found that Marress House was “a thoughtful and sustainable
refurbishment that makes excellent use of an existing building.” It was also praised for
having an environment that has attracted positive feedback from parents and children,
“helping to shape a nurturing and appropriate setting.”.
Montgomerie Park Primary School was Highly Commended in the overall Project of the Year
category.
APSE Awards
Our council achieved two honours at the Association for Public Sector Excellence (APSE)
awards on 4 December 2025.  We were recognised as Best Performer in Roads,
Highways and Winter Maintenance, and also received the award for Most
Improved in the Refuse Collection Category.  Our council was also named
as a finalist in three further categories, showcasing the high quality
work happening across a wide range of services.  
147

Page 148

Our Council Plan Progress Update – Year End 2025 to 2026 Page 52 of 67
Next Steps
We will aim to achieve the following by September 2026 or as detailed below:
• We will continue to involve communities so that their views can help inform our budgets
and shape our services.
• We will continue regenerating our properties, delivering digital projects and maximising
council assets.
• We will roll out refuse vehicle in-cab devices to additional service areas, including Bulky
Uplifts and Bin Deliveries by June 2026 as part of our Transformation Programme.
• We will deliver a year-long Island intelligence Hub pilot that will generate a dashboard to
better equip our island communities with information relative to local challenges
strengthening decision-making and maximising opportunities.
• We will have employees attending advanced BSL courses during the summer of 2026.
• We will work with partners and the Scottish Community Development Centre, the
recognised national centre of expertise, to build on our Participation Strategy and design
a shared learning programme for council and partner employees and community
members. This will be delivered in late 2026 and will give an opportunity to further
develop our shared vision for collaborative working in North Ayrshire.
148

Page 149

Our Council Plan Progress Update – Year End 2025 to 2026 Page 53 of 67
Case Study – A Workforce Information Tool   
The Workforce Information Tool is a single online portal which updates daily and enables
managers to see information and analytics on the key workforce themes:
• Workforce information and associated Costs 
• Absence Management information
• Training & Governance
The tool was created by our GIS & Analytics team on the Microsoft Power BI platform. 
Consolidating our analytics into a single council wide management report ensures we get
the maximum value from our analytics platform and reports.  
Where possible we align our analytics with the national Local Government Benchmarking
Framework service areas which allow managers to see how the data from their team
contributes to national benchmarking. 
Development records become readily available enabling managers to identify and fill in any
gaps in training, therefore ensuring our employees have the skills to support and deliver our
priorities.  
This report differs from previous analytics as this ensure we get information to our managers
as soon as it is available.  The primary goal of this is to support workforce management and
put data at the forefront of our decision-making processes.  
“The tool is really helpful as I can review my team information at one source.  It enables me
to interpret the data in a holistic way alongside my one to one in-person meetings.  I can gain
a greater understanding of whether anything needs to be put in place at an earlier stage to
support each of my colleagues.” – Senior Manager 
149

Page 150

Our Council Plan Progress Update – Year End 2025 to 2026 Page 54 of 67
Performance Summary
Performance Indicators Adrift of Target
This section details the performance indicators adrift of target and the action being taken to address
performance.  Due to expected data lags, the most recent data may relate to previous time periods
but may only now be available to report.  To avoid duplication, only data that has not previously been
reported to Cabinet through Council Plan progress reporting is included in this section.  Further
details can be found in the Performance Indicators section within this report.
CP_37 Average total tariff score of pupils living in SIMD 20% most deprived areas (Red)
The Average Total Tariff Score of the school leavers from the most SIMD deprived 20% of Scottish data
zones in 2025 was 681 points.  This is a 3.2% increase on last year and is also above the Average Total
Tariff Score of school leavers from similar SIMD areas in the whole of Scotland (676 points).  Given the
dynamic above it means that the poverty-related attainment gap is smaller than last year - a small but
significant gain in the endeavour to reduce the opportunity gap between our young people living in
the least and the most deprived areas of North Ayrshire.
CP_06 Average tariff score: All Leavers (Red)
The Average Total Tariff score for 2025 school leavers published in the March 2026 edition of the
national Insight benchmarking tool was 864.4 tariff points.  This is an increase of 2.8% compared to
the previous year.  North Ayrshire school leavers also outperform the national figures across a range
of SIMD deciles. There is a complex interaction of factors that determine the dynamic of the Average
Total Tariff Score of a school leaver.  North Ayrshire leavers are offered a wider set of opportunities to
choose more qualifications at different SCQF levels - adding more points to the tariff portfolio of each
young learner.  Wider achievement is increasing in importance without diminishing the value of
academic achievement.  
On Target,
45, 98%
Slightly Adrift
of Target, 1,
2%
Actions
On Target,
17, 66%
Slightly Adrift of
Target, 4, 15%
Significantly Adrift
of Target, 4, 15%
Data Only, 1,
4%
Performance Indicators
150

Page 151

Our Council Plan Progress Update – Year End 2025 to 2026 Page 55 of 67
CP_42 Provided floor space of commercial/industrial space within our council portfolio (sq. ft) (Red)
Performance is 394,684 against a target of 423,077.  Fluctuations across the portfolio arise as a result
of estate management actions, principally disposals.  Specific projects also impact availability, for
example, units within Bridgegate are not currently being marketed while the long-term future of the
area is under consideration.  There has also been a re-baselining of available space following the
transition of portfolio management from the Business Support and Development Service to Property
Management and Investment.  Available space will increase in the coming years as projects are
delivered, for example at Kyle Road, Annickbank and i3.
CP_02 % of council budget directed via participatory methods (Red)
1.27% of council budget has been directed via participatory methods compared to an ambitious 1.5%
target.  Though it has not been achieved, we have both expanded our ways of involving communities
and exceeded the national target of 1% spend agreed between CoSLA and the Scottish Government
consistently since 2019/20.  The financial value of participatory budgeting is only part of the outcome
as it can be difficult to attach a financial value to the vast benefits of involving our people in decision
making processes and co-designing services alongside them.  Participatory budgeting remains a key
method of engaging our people with services.
CP_07 % of school leavers entering positive destinations (LGBF) (Amber)
At the end of the 2024 to 25 academic session, 95.7% of the 1,396 school leavers identified by Skills
Development Scotland for North Ayrshire have moved on to positive post-school destinations.  As in
previous years most school leavers (72.6%) continue into Further and Higher Education.  This time,
the percentage moving into Higher Education courses (37%) have exceeded those who moved into
Further Education (35.5%) which has only occurred previously during the pandemic and two post-
pandemic years.  Within our LGBF family group we are currently 3rd below Inverclyde Council (96.4%)
and Eilean Siar Council (96.1%).  This places us 16th in the overall rankings and within the 2nd
quartile.
CP_40 Number of new build housing units reaching completion (all tenures) (actual not cumulative)
(Amber) 
The number of new build housing units reaching completion was 431 against an annual target of 436. 
This indicator includes wider private sector development where our council has limited influence over
the total number of completions achieved.  The shortfall of five units reflects delivery across a
number of sites, including some delays in completion. 
Indicator Amendments and Recommendations
CP_41 Number of empty homes brought back into use (actual)
At Mid-Year 2025 to 2026, a Quarter Two figure of 78 empty homes brought back into use was
reported resulting in an on-target (green) status at that point.  Following further year end verification,
a small number of cases were identified as having been closed prematurely and the Quarter Two
figure has been revised to 74.  While this amendment affected the position at Mid-Year, overall
performance at Year End exceeded the annual target.  Empty homes remain a key focus for the
service, and additional resources have been secured to strengthen processes and reduce the
likelihood of similar issues in future reporting.  As a precaution, a review of previous years’ data was
undertaken and no anomalies were identified.    
151

Page 152

Our Council Plan Progress Update – Year End 2025 to 2026 Page 56 of 67
CP_31 % of total household waste that is recycled (calendar year as per SEPA) (LGBF)
At Mid-Year, the Quarter Two status for Percentage of total household waste that is recycled was
51.2% and was significantly adrift of target (red).  However, further data checks have been undertaken
and the Quarter Two figure has now been revised to 56% meaning the Quarter 2 status is on target
(green).  The overall figure for 2025 to 2026 (2025 calendar year) is 52.9% against a target of 53%
meaning that this indicator remains on target (green).  All figures for 2025 to 2026 (2025 Calendar
year) are still subject to verification by SEPA and will be confirmed in October.
CP_29 Overall carbon emissions (tonnes) (Non-domestic Council estate)
At Mid-Year, the Quarter 2 Overall carbon emissions (tonnes) (Non-domestic Council estate) was
3,313.  This was a provisional figure and has since been confirmed as 3,030 by the service, which now
has all available data to complete the calculation.  There are no quarterly targets set for this indicator
and the status remains unchanged (Data Only).
CP_19 Proportion of operational buildings that are suitable for their current use (LGBF)
The provisional figure for 2024 to 2025 was incorrectly reported as 95.4% rather than the correct
figure of 95.2%.  This has been updated within this report and the status is unaffected. 
Target Amendments - Education
A recommendation to amend the 2025 to 2026 targets was agreed by Cabinet at Mid-Year.  These
have been made following the publication of confirmed 2024 to 2025 school leaver attainment data
released in February 2026.  
The total tariff measure is based on a complex national calculation using leavers’ highest
qualifications and attainment data, meaning an interim figure cannot be accurately calculated locally
during the school year.  As a result only confirmed annual data which becomes available through the
national release in February can be used to inform targets.  Therefor adjusting a target at March 2026
during the 2025 to 2026 academic year cannot be based on any internal information or data more
recent than the 2024 to 2025 academic year.
The proposed targets for Education are as follows: 
PI Description
2025 to 2026
Academic Year
Original Target
2025 to 2026
Academic Year
Proposed Target
CP_37 Average total tariff score of pupils living in SIMD 20%
most deprived areas 720 690
CP_06 Average tariff score: All Leavers 910 880
CP_38 Average total tariff for care experienced Young People 470 480 
152

Page 153

Our Council Plan Progress Update – Year End 2025 to 2026 Page 57 of 67
Actions Adrift of target
This section details actions adrift of target and the measures being taken to address performance. 
Further details can be found in the Action Tracker section within this document.
CP10 Increase the number of homes in the area through a mix of private and social developments
and bringing empty buildings back in to use (Amber)
This action has been noted as amber due to the linked performance indicator ‘CP_40 Number of new
build housing units reaching completion’ not meeting its target.  As discussed above, the number of
new build housing units reaching completion was 431 against an annual target of 436.  This indicator
includes wider private sector development where our council has limited influence over the total
number of completions achieved.  The shortfall of five units reflects delivery across a number of sites,
including some delays in completion.  We exceeded our target for bringing empty homes back into
use and will continue to monitor performance and work with partners to support delivery and
improve performance in the coming year. 
153

Page 154

Our Council Plan Progress Update – Year End 2025 to 2026 Page 58 of 67
Performance Indicators 
PI Code and Description 2022-23
Value
2022-23
Target
2022-23
Status
2023-24
Value
2023-24
Target
2023-24
Status
2024-25
Value
2024-25
Target
2024-25
Status
2025-26
Value 
2025-26
Target
2025-
26
Status 
2026-27
Target 
CP_36 Number of residents participating
in community learning and development
activity including youth work
17,804   23,503 18,700  28,102 19,500  24,794 23,500  23,500
CP_04 Proportion of children meeting
developmental milestones (LGBF) 79.5%   77.50% 79%  80% 79% 
Data
Available
May 2027
79%  79%
CP_37 Average total tariff score of pupils
living in SIMD 20% most deprived areas 670.2   664.3 714  681 720 
Data
Available
March 2027
690  700
CP_06 Average tariff score: All Leavers 847.2   840.8 908  864.4 910 
Data
Available
March 2027
880  890
CP_38 Average total tariff for care
experienced Young People 411.5   355 465  508 470 
Data
Available
March 2027
480  490
CP_07 % of school leavers entering
positive destinations (LGBF) 96.5%   95.6% 96.4%  95.7% 96.8% 
Data
Available
February
2027
96.8%  96.20% 
PI Status 
Significantly Adrift of Target 
Slightly Adrift of Target 
On Target 
Data Not Available 
Data Only
154

Page 155

Our Council Plan Progress Update – Year End 2025 to 2026 Page 59 of 67
PI Code and Description 2022-23
Value
2022-23
Target
2022-23
Status
2023-24
Value
2023-24
Target
2023-24
Status
2024-25
Value
2024-25
Target
2024-25
Status
2025-26
Value 
2025-26
Target
2025-
26
Status 
2026-27
Target 
CP_39b Number of unemployed people
that have progressed to employment as a
result of participation in council funded
or operated employability activities
427   475   643 475 
Data
Available
November
2026
450  475
CP_10a % of procurement spend on local
enterprises 26.04% 25%  24.48% 26%  26.8% 27% 
Data
Available
June 2026
27%  27%
CP_40 Number of new build housing
units reaching completion (all tenures)
(actual not cumulative)
562   384 295  371 396  431 436  407
CP_41 Number of empty homes brought
back into use (actual) 120   378 200  375 300  432 350  400
CP_28 Hectares of vacant and derelict
land in North Ayrshire 1,130 1,094  951 1,094  942 925  872 925  850
CP_27 Street Cleanliness Index - % Clean
(LGBF)1 84.6 90  89.1 87  90.3% 87  89.7% 89  89%
CP_20 Overall percentage of road
network that should be considered for
maintenance treatment
34.8% 33.8%  32.5% 34.8%  30.6% 32.5% 
Data
Available
September
2026
32%  32%
CP_42 Provided floor space of
commercial/industrial space within our
council portfolio (sq.  ft)
400,991   404,897 404,755  423,077 423,077  394,684 423,077  394,684 
1 Sourced from the Local Environmental Audit and Management System (LEAMS) audit conducted by Keep Scotland Beautiful.
155

Page 156

Our Council Plan Progress Update – Year End 2025 to 2026 Page 60 of 67
PI Code and Description 2022-23
Value
2022-23
Target
2022-23
Status
2023-24
Value
2023-24
Target
2023-24
Status
2024-25
Value
2024-25
Target
2024-25
Status
2025-26
Value 
2025-26
Target
2025-
26
Status 
2026-27
Target 
CP_02 % of council budget directed via
participatory methods 2.74% 1%  2.05% 1.5%  1.97%. 1.5%  1.27% 1.5%  1.25%
CP_43 Number of council assets under
community management (cumulative) 49   53 54  55 56  57 57  59
CP_30 Total installed capacity of low
carbon heat and electricity generation
across our council's estate
12,104 11,800  15,992 12,000  17,630 28,499  30,230 30,137  31,000
CP_29 Overall carbon emissions (tonnes)
(Non-domestic council estate) 20,896 21,000  20,745 19,500  20,333 19,953  17,229 19,824  16,519
CP_44a % of council dwellings that are
energy efficient (Formerly known as
SHSN05a) (LGBF)2
98.2   98.01 98.1  97.66 98.5  97.92 98.7  98.5%
CP_45 Length of new or improved active
travel routes per annum (Metres) 1,090   3,900 2,000  2,500 2,000  3,443 2,000  2,000
CP_46 Number of trees planted under
the North Ayrshire 2030 Tree Planting
Strategy
No data No data No data 36,531 40,000  49,026 47,000  65,305 60,000  75,000
CP_19 Proportion of operational
buildings that are suitable for their
current use (LGBF)3
95.1% 93%  95.2% 92.1%  95.2% 93%  95.2% 93%  89% 
2 LGBF reporting has paused on this indicator whilst EESSH2 is established therefore the values from 2022-23 onwards are provisional and sourced locally.
3 Data for 2025 to 2026 is provisional and will be confirmed upon the release of the LGBF data in September 2026
156

Page 157

Our Council Plan Progress Update – Year End 2025 to 2026 Page 61 of 67
PI Code and Description 2022-23
Value
2022-23
Target
2022-23
Status
2023-24
Value
2023-24
Target
2023-24
Status
2024-25
Value
2024-25
Target
2024-25
Status
2025-26
Value 
2025-26
Target
2025-
26
Status 
2026-27
Target 
CP_31 % of total household waste that is
recycled (calendar year as per SEPA)
(LGBF)4
55.3% 56.9%  56.1% 57%  53% 56%  52.9% 53%  53%
CP_25 % of council dwellings that meet
the Scottish Housing Quality Standard
(LGBF)
63.2%   76.9% 72.5%  94% 97.4% 
Data
Available
September
2026
97.57%  98.93%
CP_47 Gross rent arrears (all tenants) as
at 31 March each year as a percentage of
rent due for the reporting year (LGBF)
7.1%   5.9% 6.5%  8%  
Data
Available
September
2026
7.0%  7.0%
CP_48 % of income due from council tax
received by the end of the year (LGBF) 94.7%   93.6% 94%  94% 98% 
Data
Available
September
2026
94%  94% 
4 The 2025-26 value is a provisional figure and will be updated in the LGBF data release in October 2026.
157

Page 158

Our Council Plan Progress Update – Year End 2025 to 2026 Page 62 of 67
Action Tracker
The criteria to determine the status of an action is detailed within section 6.1.2 of Our Performance Management Strategy.
Action Status
Significantly Adrift of Target
Slightly Adrift of Target
On Target
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP01
Ensuring that wellbeing is at the heart of local life and
opportunities, with a focus on tackling inequalities
(Wellbeing Priority).
- - - - - - - -
CP02 Developing a Community Wealth Building approach to a
wellbeing economy (Wellbeing Priority). - - - - - - - -
CP03 Improving educational attainment and achievement and
closing the attainment gap (Wellbeing Priority). - - - - - - - -
CP04
Improving outcomes for care experienced young people
including implementation of The Promise (Wellbeing
Priority).
- - - - - - - -
CP05 Developing the Young Workforce and ensuring positive
destinations for school leavers (Wellbeing Priority). - - - - - - - -
CP06
Providing lifelong learning opportunities for individuals
and organisations, including digital literacy (Wellbeing
Priority).
- - - - - - - -
CP07 Maximising access to and uptake of benefits, entitlements
and financial advice (Wellbeing Priority). - - - - - - - -
CP08
Ensuring that supports are available in communities to
alleviate cost-of-living pressures through community hubs
and networks (Wellbeing Priority).
- - - - - - - -
158

Page 159

Our Council Plan Progress Update – Year End 2025 to 2026       Page 63 of 67   
5 Delivery of this action is managed through the Health and Social Care Partnership Strategic Plan
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28  
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP09
Through our housebuilding programme and wider
Housing Investment provide homes for life that meet the
needs of our residents (Wellbeing Priority).           
- - - - - - - -
CP10
Increase the number of homes in the area through a mix
of private and social developments and bringing empty
buildings back in to use (Wellbeing Priority).           
- - - - - - - -
CP11
Exploration of models and the development of pilot
schemes to increase access to and use of
public/community transport (Wellbeing Priority).           
- - - - - - - -
CP12
Ensure our places and spaces where we live, work and
visit are well maintained and accessible (Wellbeing
Priority).           
- - - - - - - -
CP13 Developing infrastructure to support business growth
(Wellbeing Priority).            - - - - - - - -
CP14 Support KA Leisure’s leadership of North Ayrshire’s Health
and Wellbeing Alliance (Wellbeing Priority).            - - - - - - - -
CP15
Through the Health and Social Care Partnership Strategic
Plan we will protect and provide care and support for
those in need (Wellbeing Priority).5
- - - - - - -    - - - - - - - - -
CP16
Developing strong relationships with communities and
partners based on trust and shared aspirations using their
experiences to inform service provision (Communities and
Local Democracy Priority).           
- - - - - - - -
159

Page 160

Our Council Plan Progress Update – Year End 2025 to 2026       Page 64 of 67  
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28  
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP17
Providing support for community organisations in
achieving their goals, including as Community Wealth
Building anchor organisations (Communities and Local
Democracy Priority).           
- - - - - - - -
CP18
Creating a participation and engagement framework
which ensures opportunities and support for all residents
to take part in influencing local democracy and council
and partner strategies (Communities and Local
Democracy Priority).           
- - - - - - - -
CP19 Supporting participatory budgeting (Communities and
Local Democracy Priority).            - - - - - - - -
CP20
Supporting community asset transfer and community
owned and operated/managed assets (Communities and
Local Democracy Priority).           
- - - - - - - -
CP21
Supporting the Community Planning Partnership and the
Community Plan (LOIP) (Communities and Local
Democracy Priority).           
- - - - - - - -
CP22 Developing partnerships with the third and voluntary
sector (Communities and Local Democracy Priority).            - - - - - - - -
CP23
Placemaking, including creation of locality action plans
based on the Community Plan (LOIP) priorities and
support the delivery of Islands Plans (Communities and
Local Democracy Priority).           
- - - - - - - -
CP24
Ensuring an inclusive, fair, rights-based and asset-based
approach in our work (Communities and Local Democracy
Priority).           
- - - - - - - -
160

Page 161

Our Council Plan Progress Update – Year End 2025 to 2026       Page 65 of 67  
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28  
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP25
Accessible public services, both digitally and locally,
ensuring a ‘No Wrong Door’ approach (Communities and
Local Democracy Priority).           
- - - - - - - -
CP26 Embedding our net-zero ambition in all democratic
decision-making (Climate Change Priority).            - - - - - - - -
CP27
Reducing the carbon footprint of our estate through
rationalisation utilising a locality-based approach and
taking a fabric first and low carbon energy generation
approach to homes and buildings (Climate Change
Priority).           
- - - - - - - -
CP28
Improving resilience and reducing carbon by developing
and supporting supply chains where materials and goods
are sourced locally (Climate Change Priority).           
- - - - - - - -
CP29
Promoting new woodland creation and protecting our
green spaces to provide a natural resource for carbon
sequestration (Climate Change Priority).           
- - - - - - - -
CP30 Supporting local businesses as they meet their climate
change obligations (Climate Change Priority).            - - - - - - - -
CP31
Promoting a circular economy in North Ayrshire to reduce
consumption of raw materials and promote reuse, repair
and recycling, and generating energy from residual waste
(Climate Change Priority).           
- - - - - - - -
CP32 Developing local low carbon energy generation schemes
and networks (Climate Change Priority).            - - - - - - - -
CP33 Unlocking the potential of community owned energy
generation to bring new income streams into            - - - - - - - -
161

Page 162

Our Council Plan Progress Update – Year End 2025 to 2026 Page 66 of 67
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
communities and help them take direct action to combat
climate change (Climate Change Priority).
CP34
Learning for sustainability, and work with communities to
adopt low carbon behaviour change and encourage
climate-based volunteering activities (Climate Change
Priority).
- - - - - - - -
CP35
Improving communities’ preparedness to deal with the
impacts of climate change already locked-in (Climate
Change Priority).
- - - - - - - -
CP36
Working with communities to adopt low carbon
behaviour change and encourage climate-based
volunteering activities (Climate Change Priority).
- - - - - - - -
CP37 Taking a nature-based approach to protect our habitats
and species (Climate Change Priority). - - - - - - - -
CP38 Developing and promoting active travel infrastructure
(Climate Change Priority). - - - - - - - -
CP39 Transitioning to low and zero carbon travel (Climate
Change Priority). - - - - - - - -
CP40
Ensuring robust governance arrangements are in place to
fulfil our council’s statutory duties, manage risk and
support delivery of key priorities (A Sustainable Council
Priority).
- - - - - - - -
CP41 Using dynamic data and lived experiences to inform
decision-making (A Sustainable Council Priority). - - - - - - - -
162

Page 163

Our Council Plan Progress Update – Year End 2025 to 2026 Page 67 of 67
Ref # Existing Overall Action and Priority
2023-24
2023-24
2023-24
2024-25
2024-25
2024-25
2024-25
2025-26
2025-26
2025-26
2025-26
2026-27
2026-27
2026-27
2026-27
2027-28
2027-28
2027-28
2027-28
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CP42
Working with partners nationally, regionally and locally to
secure investment and target resources towards our
priorities (A Sustainable Council Priority).
- - - - - - - -
CP43
Driving change and transformation, using technology
where appropriate, to deliver efficient and effective
services and support delivery of priorities (A Sustainable
Council Priority).
- - - - - - - -
CP44 Maximising financial flexibilities to help support delivery
of priorities (A Sustainable Council Priority). - - - - - - - -
CP45 Maximising value from the use of our assets (A
Sustainable Council Priority). - - - - - - - -
CP46 Focusing our investment on priorities (A Sustainable
Council Priority). - - - - - - - -
CP47
Effective workforce planning ensuring that we have the
right skills/resources to deliver priorities (A Sustainable
Council Priority).
- - - - - - - -
163

Page 164

Our Council Plan Progress Update – Year End 2025 to 2026 
Page 68 of 67  
For further information on this report please contact:
Corporate Policy and Performance
North Ayrshire Council
Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Tel:  01294 310000 
164

Page 165

North Ayrshire Council
Annual Performance Report
2025 to 2026
Appendix 2
165

Page 166

Welcome to our Annual Performance
Report 2025 to 2026 
This Annual Performance Report is the second annual report relating to Our Council Plan.  Our Council Plan
2023 to 2028 was approved by Council in June 2023 following consultation with our residents.  It is our joint
plan, our contract with our communities, Our Council Plan.  
This report provides an at a glance summary of how we’ve supported our residents of North Ayrshire
during 2025 to 2026.  You can find full details in our magazine style Council Plan Progress Reports published
on our website www.north-ayrshire.gov.uk.
We are proud to serve our people of North Ayrshire and would like to say thank you to everyone who has
supported the delivery of our services including our communities, third sector, public and private
partnerships and of course our employees. 
Councillor Anthony Gurney
Leader of the Council
Craig Hatton
Chief Executive 
Our Vision – A North Ayrshire that is fair for all. 
Our Mission – Working together to improve the lives of our people in
North Ayrshire. 
Our four Council Plan priorities are interlinked and interdependent. 
166

Page 167

2025 to 2026 About us
Elected Members
• 12 Scottish National Party (SNP) 
• 11 Labour Group Members (8 Scottish Labour Party and 3 Labour and Co-operative Party)
• 5 Scottish Conservative and Unionist 
• 3 Independent
• 2 Reform UK
Employees 
• 6,401.78 Full Time Equivalent employees
• 7,575 employees
• 73.1% female 
• 26.81% male
Key facts
• Population:  134,010 (As at Mid-Year 2024)
• 64,633 households
• Life Expectancy:
o Female:  79.7 years
o Male:  75 years
• 19,094 children and young people attend our schools and early years centres (including partner early
years centres)
• 18.0% of children in North Ayrshire live in poverty (after housing costs)
• 70.3% of residents are in employment
• 51.9% of our residents live in the most deprived Scottish Index of Multiple Deprivation areas
Key assets include: 
• North Ayrshire is 886 sq.km (mainland is 441 sq.km and our islands are
445sq.km)
• 225km coastline with beaches (including Sites of Special Scientific
Interest (SSSI)
• 42 Local Authority Early Years Provisions
• 16 Partner Early Years Provisions
• 49 Primary Schools
• 8 Secondary Schools
• 1 Additional Support Needs School 
• 1 Through School (Early Learning Centre, Primary and
Secondary School combined) 
• 13,405 council homes
• 1,057km carriageway
• 1,035km footpaths
• Approximately 26,223 streetlights
• Over 275 Hectares of woodland
• 30,230kW installed capacity of low carbon heat and 
electricity generation across our council’s estate  
167

Page 168

Financial Overview 
Scottish Government
General Grant
£344.318m
72%
Scottish Government
Specific Grant,
£7.448m
2%
Non Domestic Rates,
£42.871m
9%
Council Tax
£72.984m
15%
Use of reserves
£8.766m
2%
Funding
Corporate Services
£21.953m
5%
Education,
£191.857m
40%
Communities and
Housing, £16.577m
3%
Place
£61.734m
13%
HSCP
£142.676m
30%
Other Corporate Items
£14.138m
3%
Financing Costs
£27.452m
6%
Funding
168

Page 169

Our Performance
This section highlights key areas we have delivered under each of the four priorities: ‘Wellbeing’, ‘Communities and
Local Democracy’, ‘Climate Change’ and ‘A Sustainable Council’.  Full details can be found in our six-monthly Council
Plan Progress Reports on our website www.north-ayrshire.gov.uk.
Wellbeing
• During 2025 to 2026, our Money Matters team helped increase North
Ayrshire residents’ income by more than £20 million.  Work is underway to
simplify access to benefits by embedding our ‘No Wrong Door’ approach,
expanding cross-sector training, and reviewing progress to ensure
support remains effective and joined-up.
• Fairer Futures continued to develop through strong partnership with
communities and the third sector, focusing on building trust, improving
access to support, and embedding lived experience in service design and
decision-making. 
• We strengthened our approach to tackling child poverty by developing
new data insights with Smart Data Foundry to better identify financial
hardship and enable more targeted support.
• Training and a new child-friendly complaints process were introduced to
embed children’s rights in everyday practice, supporting implementation of the
UNCRC in Scotland.
• An independent report highlighted strong progress in Community Wealth Building,
supported by £3 million of Scottish Government funding, with the programme
assisting over 1,000 local businesses and expanding opportunities to benefit from
public sector investment. 
• The Equal employability service has been further embedded by its move to
Lochshore Park, enhancing support for people with health conditions and disabilities
through improved facilities and opportunities.
• The Employability Awards celebrated over 140 nominations, recognising the achievements
of participants building skills and confidence, while showcasing diverse career pathways and
introducing a new excellence award.
• Strong progress has been made in delivering new and affordable homes through an expanded housing
investment programme, increasing targets and advancing key developments to meet local housing need.  431
homes have been completed during 2025 to 2026.
• Efforts to reduce empty homes have been strengthened, with 432 properties brought back into use and
continued support offered to owners to increase housing supply within communities.
• Ongoing investment in existing council homes is improving safety, comfort and energy efficiency, helping to
reduce costs for tenants while informing long-term housing and sustainability plans.
• Tenant engagement and performance scrutiny remain strong, with high satisfaction levels and ongoing
improvements informed by tenant feedback, inspections and targeted action plans through to 2028.
• External funding totalling over £3 million has been secured to support housing delivery and regeneration,
enabling new homes, improved retail provision and investment in key community sites.
• Strong progress has been made across Local Housing Strategy priorities, delivering new
homes, improving affordability and choice, advancing energy efficiency, and enhancing the
quality of housing and neighbourhoods through regeneration and investment
programmes.  
169

Page 170

Communities and Local Democracy
• 431 adults and 1,955 of our young people gained recognised national awards.
• Participatory Budgeting funding of over £204,000 attracted strong community interest,
with 324 nominations received and a significant number progressing across youth,
locality and community wealth building projects.
• Proposals from the locality planning review are being implemented across all six
localities following Cabinet approval in May.  This will help strengthen
participation in local democracy.
• The Champions Board Conference brought together care-experienced young
people to share their views, build connections and help shape future activity,
strengthening the council’s commitment to keeping The Promise.
• Co-design with communities and third sector partners continues to strengthen trust
and relationships, with practical improvements such as community connector roles
and a shared services directory enhancing access to support.
• Over £800,000 of funding has been secured in partnership with the Scottish
Government’s Islands Programme to support key projects on Arran, enhancing
community facilities and infrastructure in line with national priorities.
• Our Connected Communities service is supporting residents to improve their
English skills, build confidence and overcome communication barriers through
tailored learning and supportive the Big Class programme sessions.
Climate Change
• The 7.560MW Nethermains Solar Farm has now moved into the Operation and
Maintenance Phase following the works completion certificate being issued in January 2026.  
• The 5.344MW Shewalton Solar PV Farm was commissioned on 6 March 2026.  An official opening is expected to
take place in the coming months. 
• A tree planting exercise was completed in January with a total of 8,050 trees planted, over 65,000 to date, further
supporting our Tree Planting and Nature Network strategies. 
• A gas pumping trial was successfully held on the Nethermains site throughout January - February 2026.  The trials
were successful with a decision pending on whether to proceed with the gas recovery works. 
• Phase Two of the CNI solar project is underway on Cumbrae, supporting 130 homes with renewable
energy solutions to reduce carbon emissions and fuel poverty while delivering wider community
benefits.
• Work is ongoing to identify new low carbon energy opportunities, including community
ownership models, while supporting local groups through the Community Renewable Energy
Generation Fund.
• The Area Based Scheme continues to progress, delivering energy efficiency improvements
and expanding to new areas to help reduce fuel poverty and support low carbon heating.
• The ECO4 Flex partnership has delivered over £1 million in external funding, supporting 48
households with energy efficiency improvements and low carbon heating measures.
• Strong collaboration has supported local suppliers to secure contracts worth £32 million
over the year, reinforcing the council’s commitment to sustaining the local economy and resilient
supply chains.
• We continue to deliver strong recycling performance, exceeding targets, ranking among the top-
performing councils in Scotland, and gaining national recognition for improvement.
• Climate and energy learning has been expanded across schools, building knowledge, skills and engagement
among pupils, staff and council climate champions to support practical climate action.
170

Page 171

• To help ensure wider participation, an online platform has been developed in-house, enabling residents who are
unable to attend Climate Workshops to share their views on climate action.
• Community engagement is supporting the development of Community Climate Action Plans, with mapping and
digital tools helping residents shape local priorities and actions.
• All planned sustainability and volunteering activities were delivered, supporting community engagement and
securing an £80,000 funding application to expand future climate and youth engagement initiatives.
• Nature-based improvements and biodiversity activity have been strengthened through partnership working,
investment, and community-led projects, enhancing local environments and supporting conservation across
North Ayrshire.
• Investment in active travel infrastructure, supported by Levelling Up Fund funding, is improving walking and
cycling routes, enhancing accessibility, and expanding sustainable travel opportunities across North Ayrshire.
• Enhancements to public transport infrastructure have improved accessibility and reliability, including the
installation of real-time information and upgraded bus stops and shelters.
• The Travel Smart Programme continues to promote behaviour change through targeted engagement and
practical initiatives, encouraging greater use of active and sustainable travel options.
A Sustainable Council
• North Ayrshire Council’s scheduled Controller of Audit (Section 102) Best Value report was considered by the
Accounts Commission in October and Council in December.  The findings are extremely positive, highlighting a
culture of continuous improvement, a proactive focus on addressing inequalities in our communities and stating
the council is “an exemplar of how to do transformation well”.
• Budget engagement activity generated strong community input, with over 1,100 responses
helping to shape a £485 million budget, including investment in renewable energy and
measures to reduce child poverty.
• Significant external funding, including over £1.5 million from the Vacant and Derelict
Land Fund, £376,535 for council-led projects and £397,000 for community groups
through UKSPF, alongside £1.5 million for Pride in Place, is supporting regeneration
and community development across North Ayrshire.
• Progress continues on property rationalisation, with construction underway on a
new customer service centre and plans in place to consolidate services into
Cunninghame House to support efficiency and regeneration.
• Following the approval of the Generative AI Policy by Cabinet providing clear
guidance for employees, a trail is underway to test additional functionality.
• The Smart Infrastructure Pilot Project and wider digital programmes have progressed
into delivery, providing real-time data insights, strengthening digital connectivity and skills,
and supporting economic growth through significant investment and collaboration across Ayrshire.
Next Steps
Next steps for the following six months are included in our six monthly Council Plan Progress Reports on our website
www.north-ayrshire.gov.uk.
How do we compare?
You can discover how our performance compares to other Scottish local
authorities through the national Local Government Benchmarking
Framework online tool or through our LGBF Report published within our
Year End reporting on our website www.north-ayrshire.gov.uk.
171

Page 172

We strive to make our reporting as accessible as possible.  If you
have any questions or require further information on our
council’s performance please contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at: Council Performance (north-ayrshire.gov.uk)
172

Page 173

Local Government
Benchmarking Framework
Analysis of April 2026
Data Release
Appendix 3
173

Page 174

Contents
Introduction .............................................................................................................................................. 1
LGBF Priority Indicators ............................................................................................................................ 2
People Services .................................................................................................................................. 7
Other Services ................................................................................................................................. 19
174

Page 175

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 1 of 31
Introduction
The Local Government Benchmarking Framework (LGBF) provides an opportunity to benchmark our
performance with other local authorities in Scotland. It is administered by the Improvement Service
in partnership with the Society of Local Authority Chief Executives (SOLACE) and highlighted within
the Accounts Commission’s Statutory Performance Information Direction 2024 which defines how
local authorities should demonstrate they are achieving Best Value for the people they serve. 
We have identified 33 indicators that closely link to the priorities within our Council Plan. Data for
these indicators is released in phases during the year. Areas such as CO2 emissions, Gross Value
Added and claimant count are included as priority indicators as they are monitored by our council to
reflect our operating environment, though we have limited influence on these areas directly. This
section demonstrates our relative performance for these indicators as at the April 2025 data release.
This information alongside the LGBF Dashboard enables us to learn from others to improve services
for our residents.
For comparison, local authorities are divided into quartiles dependent on their overall ranking for
each indicator.  As at April 2026, 20 of our 33 priority indicators are in the top two quartiles. Top
quartile performance includes areas such as proportion of pupils entering positive destinations, CO2
emissions area wide per capita and percentage of unemployed people assisted into work from
council programmes
In the short term (most recent one year period available), 24 of our 33 priority indicators have shown
improvement in performance, whereas seven have demonstrated a reduction in performance and
two have stayed the same. Some of the indicators which have improved are proportion of children
meeting developmental milestones, immediate available employment land as a percentage of total
land allocated for employment purposes and proportion of Social Welfare Fund (SWF) Community
Care Grant decisions within 15 days. Those that have declined in performance include proportion of
people earning less than the living wage, proportion of the highest paid 5% of employees who are
women and claimant count as percentage of 16-24 population.
The following is a breakdown of the priority indicators within the context of family groups. Family
groups enable local authorities to make as close to a like for like comparison as possible with other
councils by grouping those with similar traits depending on the indicator. Grouping is based on levels
of deprivation (people services) or rurality (other services).  We align our LGBF analysis to the family
groups used within the LGBF Dashboard.  Currently these are: 
Peoples Services (Deprivation)
• North Ayrshire Council
• Comhairle nan Eilean Siar
• Dundee City Council
• East Ayrshire Council
• North Lanarkshire Council
• Inverclyde Council
• West Dunbartonshire Council
• Glasgow City Council
Other Services (Rurality)
• North Ayrshire Council
• Perth and Kinross
• Stirling Council
• Moray Council
• South Ayrshire Council
• East Ayrshire Council 
• East Lothian Council
• Fife Council 
175

Page 176

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 2 of 31
LGBF Priority Indicators
The table below displays the short term (or prior year) comparison of the performance, rank and quartile for the 33 priority LGBF indicators. To assess
performance, the terms ‘improved’ or ‘declined’ are used in this report. This terminology is used as for some indicators a value increasing is improved
performance however for other indicators, a value increasing is declined performance. Each indicator is linked to a chart later in the document for more
information.
In summary, of the 33 indicators over the short term:
• Performance has improved for 24 (72.7%), declined for 7 (21.2%) and stayed the same for 2 (6.1%). 
• Rank has improved for 19, declined for 10, and stayed the same for 4.
• Quartile has improved for 12 declined for 3 and stayed the same for 18.
Key 
Improved 
Stayed the same 
Declined 
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CHN11 - Proportion of pupils
entering positive destinations
(CP_07)
2024 to
2025 95.6% 95.7%  19 16  3 2 
CHN – 17 Proportion of Children
meeting developmental
milestones (CP_04)
2024 to
2025 77.4% 80%  32 28  4 4 
176

Page 177

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 3 of 31 
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CHN24 - Proportion of children
living in poverty (after housing
costs)
2024 to
2025 18.1% 18.0%  31 31  4 4 
CLIM01 - CO2 emissions area
wide per capita
2023 to
2024 4.56 4.04  20 15  3 2 
CLIM02 - CO2 emissions area
wide: emissions within scope of
LA per capita
2023 to
2024 4.90 4.38  22 18  3 3 
CLIM03 - CO2 emissions from
Transport per capita
2024 to
2025 29.51 27.29  22 17  3 3 
CLIM04 - CO2 emissions from
electricity per capita
2024 to
2025  45.78 46.53  17 24  3 3 
CLIM05 - CO2 emissions from
natural gas per capita
2024 to
2025 72.11 68.69  25 25  4 4 
CORP03b - Proportion of the
highest paid 5% of employees
who are women
2024 to
2025 64.0% 63.9%  4 6  1 1 
CORP3c – Gender Pay Gap 2024 to
2025 0.0% 0.3%  7 13  1 2 
CORP07 - Percentage of income
due from Council Tax received
by the end of the year (CP_48)
2024 to
2025 93.6% 94.0%  30 26  4 4 
CORP08 - Percentage of invoices
sampled that were paid within
30 days
2024 to
2025 95.8% 96.4%  6 7  1 1 
177

Page 178

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 4 of 31 
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
CORP09 - Proportion of SWF
Crisis Grant decisions within 1
day
2024 to
2025 99.2% 99.2%  9 14  2 2 
CORP10 - Proportion of SWF
Community Care Grant decisions
within 15 days
2024 to
2025 99.1% 99.2%  10 9  2 2 
CORP-ASSET01 - % of
operational buildings that are
suitable for their current use
(CP_19)
2024 to
2025 95.2% 95.2%  6 7  1 1 
ECON01 - Percentage of
Unemployed People Assisted
into work from Council
Programmes
2024 to
2025 19.0% 23.0%  8 4  1 1 
ECON04 - Proportion of
procurement spent on local
enterprises
2024 to
2025 23.9% 26.8%  19 18  3 3 
ECON05 - No of business
gateway start-ups per 10,000
population
2025 to
2026 12.3 13.1  25 24  4 3 
ECON07 - Proportion of people
earning less than the living wage
2024 to
2025 10.7% 10.9%  9 6  2 1 
ECON09 - Town Vacancy Rates 2024 to
2025 7.8% 7.2%  6 7  1 1 
ECON10 - Immediate available
employment land as a % of total
land allocated for employment
purposes
2024 to
2025 42.7% 44.5%  9 5  2 1 
178

Page 179

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 5 of 31 
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
ECON11 - Gross Value Added
(GVA) per capital
2023 to
2024 £20,301 £20,887  26 25  4 4 
ECON12a - Claimant Count as a
% of Working Age Population
2025 to
2026 4.2% 4.1%  31 31  4 4 
ECON12b - Claimant Count as %
of 16-24 Population
2025 to
2026 5.5% 5.8%  32 32  4 4 
ENV03c - Street Cleanliness
Score (CP_27)
2024 to
2025 89.1% 90.3%  24 20  3 3 
ENV04b - Percentage of A class
roads considered for
maintenance treatment
2024 to
2025 28.9% 26.7%  21 13  3 2 
ENV04c - Percentage of B class
roads considered for
maintenance treatment
2024 to
2025 27.4% 25.5%  13 7  2 1 
ENV04d - Percentage of C class
roads considered for
maintenance treatment
2024 to
2025 38.5% 36.8%  26 23  4 3 
ENV04e - Percentage of
unclassified roads considered for
maintenance treatment
2024 to
2025 32.4% 30.5%  11 7  2 1 
ENV06 - Proportion of total
household waste arising that is
recycled (CP_31)
2024 to
2025 56.1% 53.0%  4 9  1 2 
HSN01b - Gross rent arrears (all
tenants) as a percentage of rent
due for the year (CP_47)
2024 to
2025 7.5% 8.0%  7 14  1 2 
179

Page 180

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 6 of 31 
Performance Rank Quartile
LGBF Priority Indicator
Most
recent
year
available
Previous year’s
data 
Most recent
data
Data
improve
/ decline
Prior year
rank 
Most
recent rank
Rank
improve
/ decline
Previous
year’s
quartile 
Most
recent
quartile
Quartile
improve
/ decline
HSN03 - Proportion of council
dwellings meeting Scottish
Housing Quality Standards
(CP_25)
2024 to
2025 76.9% 94.0%  16 3  2 1 
HSN05a - Proportion of council
dwellings that are energy
efficient (CP_44)
2021 to
2022 97.6% 97.7%  2 2  1 1 
180

Page 181

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 7 of 31
People Services
The table below displays the short – term, medium term and long term comparisons against our current year for our 15 People Services family group
indicators. When 10 full recording periods were not available the most historical figure has been used for the long term comparison. Each indicator is linked
to a chart later in the document for more information.
In summary, of the 15 indicators over the short, medium and long term.
• Short Term Family Group Rank – 8 (53.3%) Improved, 4 (26.6%) declined 3 (20%) and stayed the same 
• Medium Term Family Group Rank – 6 (40%) Improved, 7 (46.6%) declined and 2 (13.3%) stayed the same 
• Long Term Family Group Rank – 4 (26.6%) Improved, 8 (53.3%) declined and 3 (20%) stayed the same 
Short Term, Medium Term and Long Term
Comparisons for our People Services Family
Group 
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Peoples Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CHN11 - Proportion of pupils entering
positive destinations
2024 to
2025 16 2023 to
2024 19  2021 to
2022 15  2014 to
2015 6 
CHN17 - Percentage of children meeting
development milestones
2024 to
2025 28 2023 to
2024 32  2021 to
2022 28  2014 to
2015 13 
CHN24 - Proportion of Children Living in
Poverty After Housing Costs
2024 to
2025 31 2023 to
2024 31  2021 to
2022 31  2014 to
2015 31 
181

Page 182

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 8 of 31
ECON1 - Percentage of Unemployed People
Assisted into work from Council
Programmes
2024 to
2025 4 2023 to
2024 8  2021 to
2022 12  2014 to
2015  8 
ECON12a - Claimant Count as a percentage
of working age population
2025 to
2026 31 2024 to
2025 31  2022 to
2023 30  2015 to
2016 32 
ECON12b - Claimant Count as a percentage
of 16-24 population
2025 to
2026 32 2024 to
2025 32  2022 to
2023 31  2015 to
2016 32 
ECON7 - Proportion of people earning less
than the living wage
2024 to
2025 6 2023 to
2024 9  2020 to
2021 12  2013 to
2014 25 
ECON9 - Town Vacancy Rates 2024 to
2025 7 2023 to
2024 6  2021 to
2022 18  2014 to
2015  6 
ENV3c - Street Cleanliness Score 2024 to
2025  20 2023 to
2024  24  2021 to
2022 27  2014 to
2015 22 
HSN1b - Gross Rent Arrears (All Tenants) as
a Percentage of rent due for the year
2024 to
2025 14 2023 to
2024 7  2021 to
2022 7  2014 to
2015 3 
HSN3 - Proportion of Council dwellings
meeting Scottish Housing Quality Standards
2024 to
2025 3 2023 to
2024 16  2021 to
2022 21  2014 to
2015 3 
182

Page 183

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 9 of 31
HSN5a - Proportion of council dwellings that
are energy efficient
2021 to
2022 4 2020 to
2021 2 2018 to
2019 1 2015 to
2016 3
CORP7 - Percentage of income due from
Council Tax received by the end of the year
2024 to
2025 26 2023 to
2024 30 2021 to
2022 31 2014 to
2015 24
CORP9 - Percentage of Scottish Welfare
Fund Crisis Grant decisions within one day
2024 to
2025 14 2023 to
2024 9 2021 to
2022 8 2018 to
2019 7
CORP10 - Percentage of Scottish Welfare
Fund Community Care Grant decisions in 15
days
2024 to
2025 9 2023 to
2024 10 2021 to
2022 5 2018 to
2019 6
183

Page 184

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 10 of 31
(Please note, axis scales used within the following charts vary to ensure trends are visible.)
CHN11 – Proportion of pupils entering positive destinations 
At the end of the 2024 to 2025 academic session, 95.7% of the 1,396 school leavers identified by
Skills Development Scotland for North Ayrshire have moved to positive post-school destinations.  As
in previous years most school leavers, 72.6%, continue into Further and Higher Education.  This time,
the percentage moving into Higher Education courses (37%) has exceeded those who moved into
Further Education (35.5%).  This has previously happened during the pandemic and two post-
pandemic years.  Within our family group we are currently 3rd below Inverclyde Council (96.4%) and
Eilean Siar Council (96.1%). This places us 16th in the overall rankings and within the 2nd quartile. 
CHN17 – Percentage of children meeting developmental milestones 
The percentage of children meeting developmental milestones for 2024 to 2025 was 80%. We are
currently 5th within our family group below Inverclyde Council (87%), Eilean Siar Council (84.5%),
North Lanarkshire Council (82.5%) and Dundee City Council (81.6%) and above West Dunbartonshire
184

Page 185

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 11 of 31
Council (78.6%) and East Ayrshire Council (78.5%). Our relative position is 28 which places us within
the 4th quartile. Locally we have exceeded our target of 79%. 
CHN24 – Proportion of Children Living in Poverty After Housing Costs 
Trend data should be interpreted with caution as the Scottish and UK Governments introduced a
new, more accurate methodology for measuring household income in 2023 to 2024 (published in
2026 – this is represented by the purple vertical line on the chart). Across Scotland, percentage rates
have decreased in line with the national trend as a direct result of this improved approach. However,
the new methodology has not resulted in a new indicator within the LGBF, meaning the methodology
is not consistent over the years and trend is significantly skewed as a result.
For the first time, the data now combines survey responses with linked Department for Work and
Pensions (DWP) administrative records, addressing well known issues of under reporting of benefit
income in the Family Resources Survey. This results in a more accurate picture of household incomes,
particularly for low-income families.
However, the new methodology appears to have had a more pronounced effect in areas like North
Ayrshire, where there are higher rates of economic inactivity and therefore greater reliance on social
security.
Currently 18% (2024 to 2025) of children are living in poverty after housing costs with only one
authority, Glasgow City Council 23.3% with higher rates within our family group (and nationally). We
currently sit lower than both our Family Group Average (16.7%) and the National Average (14.8%)
and remain in the 4th Quartile.
185

Page 186

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 12 of 31
ECON1 – Percentage of Unemployed People Assisted into work from Council Programmes 
The percentage of unemployed people assisted into work from Council Programmes for 2024 to 2025
is 23%. This places us 3rd in our family group behind Eilean Siar Council (60%) and North Lanarkshire
Council (23.7%), 4th in the overall rankings and within the 1st quartile. 
The “Your Next Move Working North Ayrshire” programme provides lifelong learning opportunities
for individuals who access this service to support them to prepare and progress to employment. In
addition to the continuing support delivered as part of Your Next Move Working North Ayrshire
which includes the Equal Programme, Modern Apprenticeships, Skills for Life, Ambition Agreements,
Criminal Justice Mentors, CEiS Ayshire, We Work for Families, TACT: Positive Pathways and Barnardos
additional provision will also be delivered by partners including SAMH, Streetleague, Impact Arts,
Salvation Army, Ayrshire Chamber of Commerce, Maritime Museum, Beith Trust, Hub International
and Ko-Next ensuring more opportunities are available to engage more unemployed individuals and
support their progression to a positive destination.
186

Page 187

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 13 of 31
ECON12a – Claimant Count as a percentage of working age population 
The claimant count as a percentage of working age population for North Ayrshire Council was 4.1%.
This places us second lowest within our family group above only Glasgow City Council (4.8%). Our
relative position is 31 above only Glasgow City Council. This places us within the 4th quartile. 
ECON12b - Claimant Count as a percentage of 16-24 population 
The claimant count as a percentage of 16-24 population for North Ayrshire was 5.8%. This means we
are least well performing of our family group rankings and 32nd in the relative position. This places us
within the 4th quartile. 
187

Page 188

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 14 of 31
ECON7 – Proportion of people earning less than the living wage 
The proportion of people earning less than the living wage for 2024 to 2025 was 10.9%. This places us
second within our family group behind only Glasgow City Council (10.4%). This means we are 6th in
the overall rankings and within the 1st quartile. 
ECON9 – Town Vacancy Rates 
Our town vacancy rates for 2024 to 2025 was 7.2%. This places us 3rd in the family group rankings
behind Eilean Siar Council (5.5%) and Inverclyde Council (6.1%). This means we are 7th in the overall
rankings and within the 1st quartile. 
188

Page 189

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 15 of 31
ENV3c – Street Cleanliness Score 
Our street cleanliness score for 2024 to 2025 was 90.3%. This means we are fourth in our family
group rankings behind East Ayrshire Council (92.6%), Eilean Siar Council (92.4%) and Inverclyde
Council (91.1%). This places us 20th in the overall rankings and within the 3rd quartiles. 
HSN1b – Gross Rent Arrears (All Tenants) as a Percentage of rent due for the year 
Our gross rent arrears (all tenants) as a percentage of rent due for the year was 8% for 2024 to 2025.
This places us second least well performing of our family group ahead of West Dunbartonshire
Council (8.8%). This means we are 14th in the overall rankings and within the 2nd quartile. 
189

Page 190

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 16 of 31
HSN3 – Proportion of Council dwellings meeting Scottish Housing Quality Standards 
The proportion of Council dwellings meeting Scottish Housing Quality Standards for 2024 to 2025 was
94%. This means we are 2nd in our family group behind East Ayrshire Council (98.2%). This places us
3rd in the overall rankings and within the 1st quartile. 
HSN5a – Proportion of council dwellings that are energy efficient 
The proportion of council dwellings that are energy efficient for 2021 to 2022 was 97.7%. This places
us 2nd in our family group behind East Ayrshire Council (99.5%). This means we are 4th within the
overall rankings and within the 1st quartile. 
190

Page 191

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 17 of 31
CORP7 – Percentage of income due from Council Tax received by the end of the year 
The percentage of income due from Council Tax received by the end of year was 94% for 2024 to
2025. This means we are 4th in the family group rankings behind East Ayrshire Council (94.9%),
Inverclyde Council (94.8%) and North Lanarkshire Council (94.5%). This means that we are 26th in the
overall rankings and within the 4th quartile. 
The reported performance represents an improvement from the previous year. However, underlying
performance continues to remain below pre-pandemic levels. Collection activity in relation to Council
Tax debt continues, with the achievement of budgeted recovery levels forecast over the medium
term. As detailed in the Mid-Year 2025 to 2026 Progress Report, we continue to support residents
throughout the year through repayment plans and where required through directing residents to
other money advice supports available. Ongoing encouragement for residents to use the direct debit
payment method should help improve collection levels in future.
191

Page 192

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 18 of 31
CORP9 – Percentage of Scottish Welfare Fund Crisis Grant decisions within one day 
The percentage of Scottish Welfare Fund Crisis Grant decision within one day was 99.2% for 2024 to
2025. This places us 4th in the family group rankings behind Eilean Siar Council (although there
appears to be an error as their percentage is showing as 101.7%), Inverclyde Council (99.7%) and East
Ayrshire Council (99.6%). This means we are 14th in the overall rankings and within the 2nd quartile. 
CORP10 – Percentage of Scottish Welfare Fund Community Care Grant decisions in 15 days 
The percentage of Scottish Welfare Fund Community Care Grant decisions in 15 days was 99.2%. This
places us 2nd in our family group rankings behind Inverclyde Council (99.6%), 9th in the overall
rankings and within the 2nd quartile. 
192

Page 193

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 19 of 31
Other Services
The table below displays the short – term, medium term and long term comparisons against our current year for our 18 Other Services family group
indicators. When 10 full recording periods were not available the most historical figure has been used for the long term comparison. Each indicator is linked
to a chart later in the document for more information.
In summary, of the 18 indicators over the short, medium and long term.
• Short Term Family Group Rank – 11 (61.1%) Improved, 6 (33.3%) declined and 1 (5.5%) stayed the same.
• Medium Term Family Group Rank – 13 (72.2%) Improved, 4 (22.2%) declined and 1 (5.5%) stayed the same.
• Long Term Family Group Rank – 13 (72.2%) Improved, 4 (22.2%) declined and 1 (5.5%) stayed the same. 
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Other Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CLIM1 – CO2 emissions area wide per capita 2023 to
2024 15 2022 to
2023 20  2020 to
2021 19  2013 to
2014 19 
CLIM2 – CO2 emissions area wide: emissions
within scope of Local Authority per capita
2023 to
2024 18 2022 to
2023 22  2020 to
2021 19  2013 to
2014 23 
CLIM3 -CO2 emissions from transport per
1000 population
2024 to
2025 17 2023 to
2024 22  2021 to
2022 23  2017 to
2018 24 
193

Page 194

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 20 of 31
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Other Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CLIM4 – CO2 emissions from electricity per
1000 population
2024 to
2025 24 2023 to
2024 17  2021 to
2022 21  2017 to
2018 16 
CLIM5 – CO2 emissions from natural gas per
1000 population
2024 to
2025 25 2023 to
2024 25  2021 to
2022 24  2017 to
2018 27 
ECON10 – Immediate available employment
land as percentage of total land allocated for
employment purposes
2024 to
2025 5 2023 to
2024 9  2021 to
2022 11  2014 to
2015 26 
ECON11 – Gross value added (GVA) per
capita
2023 to
2024 25 2022 to
2023 26  2020 to
2021 25  2013 to
2014 26 
ECON5 – No of business gateway start – ups
per 10,000 population
2024 to
2025 24 2023 to
2024 25  2021 to
2022 29  2014 to
2015 14 
ECON4 – Proportion of procurement spent
on local enterprises
2024 to
2025 18 2023 to
2024  19  2021 to
2022  24  2014 to
2015 26 
194

Page 195

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 21 of 31
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Other Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
ENV4b - Percentage of A class roads
considered for maintenance treatment
2024 to
2025 13 2023 to
2024  21  2021 to
2022 26  2014 to
2015 27 
ENV4c - Percentage of B class roads
considered for maintenance treatment
2024 to
2025 7 2023 to
2024 13  2021 to
2022 17  2014 to
2015 18 
ENV4d - Percentage of C class roads
considered for maintenance treatment
2024 to
2025 23 2023 to
2024 26  2021 to
2022 28  2014 to
2015 30 
ENV4e - Percentage of unclassified roads
considered for maintenance treatment
2024 to
2025 7 2023 to
2024 11  2021 to
2022 15  2014 to
2015 17 
ENV6 – Percentage of total household waste
arising that is recycled
2024 to
2025 9 2023 to
2024 4  2021 to
2022 2  2014 to
2015 2 
CORP3b – Percentage of the highest paid 5%
of employees who are women
2024 to
2025 6 2023 to
2024 4  2021 to
2022 9  2014 to
2015 6 
195

Page 196

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 22 of 31
Short Term, Medium Term and Long Term
Comparisons for our Other Services Family
Group
Current Year Short Term Comparison  Medium Term Comparison  Long term Comparison 
LGBF Indicators Other Services Year Rank Year Rank
Rank
improve
/ decline
Year Rank
Rank
improve
/ decline
Year  Rank
Rank
improve
/ decline
CORP3c – Gender Pay Gap 2024 to
2025  5 2023 to
2024 1  2021 to
2022 6  2015 to
2016 8 
CORP8 – Percentage of invoices sampled
that were paid within 30 days
2024 to
2025 7 2023 to
2024 6  2021 to
2022 4  2014 to
2015 14 
CORP-ASSET1 – Percentage of operational
buildings that are suitable for their current
use
2024 to
2025 7 2023 to
2024 6  2021 to
2022 11  2014 to
2015 5 
196

Page 197

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 23 of 31 
(Please note, axis scales used within the following charts vary to ensure trends are visible.)
CLIM1 – CO2 emissions area wide per capita 
Our CO2 emissions area wide per capita was 4.04 tCO2e. This places us 3rd in the family group
rankings behind East Ayrshire Council (3.46 tCO2e) and Stirling Council (3.85 tCO2e). This means we
are 15th in the overall rankings and within the 2nd quartile. 
CLIM2 – CO2 emissions area wide: emissions within scope of local authority per capita 
Our CO2 emissions area wide within scope of our local authority per capita was 4.38 tCO2e for 2023
to 2024. This places us 3rd in our Family Group behind East Ayrshire Council (3.91 tCO2e) and East
Lothian Council (4.06 tCO2e). This means we are 18th in the overall rankings and within the 3rd
quartile. 
197

Page 198

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 24 of 31
CLIM3 -CO2 emissions from transport per 1000 population 
CO2 emissions from transport per 1000 population for 2024 to 2025 was 27.29 tCO2e. This places
North Ayrshire Council 3rd in the family group behind East Lothian Council (9.52 tCO2e) and Stirling
Council (3.85 tCO2e). Meaning we are 17th in the overall rankings and within the 3rd quartile. 
CLIM4 – CO2 emissions from electricity per 1000 population 
CO2 emissions from electricity per 1000 population for 2024 to 2025 was 46.53 tCO2e. This places us
as least well performing of the family group, 24th in the overall relative position and within the 4th
quartile.
198

Page 199

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 25 of 31
CLIM5 – CO2 emissions from natural gas per 1000 population 
CO2 emissions from natural gas per 1000 population for 2024 to 2025 is 68.69 tCO2e. This places us
as least well performing of the family group and 24th in the overall relative position and within the
4th quartile
ECON10 – Immediate available employment land as percentage of total land allocated for
employment purposes 
Our immediate available employment land as percentage of total land allocated for employment
purposes for 2024 to 2025 was 44.5%. This places us top of our family group. This means we are 5th in
the overall rankings and within the 1st quartile. 
199

Page 200

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 26 of 31
ECON11 – Gross value added (GVA) per capita 
The Gross value added (GVA) per capita for 2023 to 2024 was £20,887. This places us 3rd least well
performing of our family group ahead of only East Lothian Council (£18,742) and East Ayrshire
Council (£18,003). This means we are 25th in the overall rankings and within the 4th quartile. 
ECON5 – No of business gateway start–ups per 10,000 population 
The number of business gateways start – ups per 10,000 population was 13.1. North Ayrshire Council
is currently 4th with East Lothian Council (12.0), South Ayrshire Council (11.4) and Moray Council (7.6)
ranking below us. This means we are 24th in the overall rankings and within the 3rd quartile. 
200

Page 201

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 27 of 31
ECON4 – Proportion of procurement spent on local enterprises 
The proportion of procurement spent on local enterprises for 2024 to 2025 was 26.8%. This places us
third in our family group rankings and 18th in the overall rankings (3rd quartile).  This is a different
indicator to CP_10a “% of procurement spend on local enterprises” within our Council Plan
performance framework which captures all spend including under £1,000 however it also sits at
26.8% for the same period.
ENV4b - Percentage of A class roads considered for maintenance treatment 
Our percentage of A class roads considered for maintenance treatment for 2024 to 2025 was 26.7%.
This places us third within our family group behind East Ayrshire Council (17.7%) and South Ayrshire
Council (23.4%). We are 13th in the overall rankings and within the 2nd quartile. Since the baseline
year (2010 to 2011), we have seen a positive change in performance from 46.7% to 26.7% moving
from 31st in the overall rankings in 2010 to 2011 to 13th as at the most recent data release. 
201

Page 202

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 28 of 31
ENV4c - Percentage of B class roads considered for maintenance treatment 
Our percentage of B class roads considered for maintenance was 25.5% for 2024 to 2025. This places
us 3rd within our family group behind Moray Council (20.5%) and East Ayrshire Council (25.2%). This
means we are 7th in the overall rankings and within the 1st quartile. Similarly to our A class roads
considered for maintenance treatment, our B class roads considered for maintenance treatment
have also seen improvement from the baseline year (2010 to 2011) moving from 46.1% to 25.5%.
This represents a change in the overall rankings from 29th in 2010 to 2011 to 7th in 2024 to 2025.
ENV4d - Percentage of C class roads considered for maintenance treatment 
Our percentage of C class roads considered for maintenance treatment for 2024 to 2025 was 36.8%.
This places us 3rd least well performing of our family group ahead of South Ayrshire Council (37.6%)
and Stirling Council (39.5%). This means we are 23rd in the overall rankings and within the 3rd quartile.
Continuing the positive long-term trends of both A and B class roads, C class roads considered for
202

Page 203

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 29 of 31
maintenance treatment have also reduced from 58.6% to 36.8% since the baseline year (2010 to
2011). This has resulted in an increase in ranking from 31st in 2010 to 2011 to 23rd overall. 
ENV4e - Percentage of unclassified roads considered for maintenance treatment 
Our percentage of unclassified roads considered for maintenance treatment was 30.5% for 2024 to
2025. This places us top of our family group, 7th in the overall rankings and within the 1st quartile. The
trend has been slightly steadier compared to the A, B and C class roads, and has improved since the
baseline year (2010 to 2011). This is a rise from 13th in the overall rankings in 2010 to 2011 to 7th in
the most recent year. 
ENV6 – Percentage of total household waste arising that is recycled 
The percentage of total household waste arising that is recycled was 53% for 2024 to 2025. This
means we are 5th within our family group, behind Moray Council (56.7%), East Lothian Council
(55.3%), South Ayrshire Council (53.3%) and Stirling Council (53.2%). We are 9th in the overall
rankings and within the 2nd quartile. This performance is delivered while managing one of the highest
203

Page 204

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 30 of 31
waste tonnages among the top performing authorities, highlighting both our strong outcomes and
operational scale. We were recognised with the Most Improved Performer Award in the Refuse
Collection Category by ASPE in December 2025.  A provisional figure for 2025 to 2026 is 52.9% and is
yet to be verified.
CORP3b – Percentage of the highest paid 5% of employees who are women   
The percentage of the highest paid 5% of employees who are women was 63.9% for 2024 to 2025.
This puts us at the top of our family group. We are 6th in the overall rankings and within the 1st
quartile. 
CORP3c – Gender Pay Gap 
The gender pay gap was 0.3% as at 2024 to 2025. This means we are 5th in the overall rankings and
within the first quartile. 
204

Page 205

Local Government Benchmarking Framework Analysis of April 2026 Data Release - Page 31 of 31
CORP8 – Percentage of invoices sampled that were paid within 30 days
The percentage of invoices sampled that were paid within 30 days was 96.4% as at the most recent
data release. This means we are second in our family group rankings behind Fife Council (97.1%). We
are 7th in the overall rankings and within the first quartile. 
CORP-ASSET1 – Percentage of operational buildings that are suitable for their current use
The percentage of operational buildings that are suitable for their current use is 95.2%. This places us
third in our family group behind Perth and Kinross Council (96.9%) and Moray Council (96.1%). We
are 7th in the overall rankings and within the first quartile. Condition information is gathered across
the corporate estate and used to inform asset management decision in relation to property
rationalisation and investment decisions. Accommodation changes are presently focused within the
Irvine estate with improvements being made to Cunninghame House to enable the relocation of
employees from Bridgegate House. Condition improvement works have been completed at
Skelmorlie Primary and are currently progressing at Goldcraigs Depot Kilwinning Hayocks Primary
School and Caledonia Primary School.
205

Page 206

We strive to make our reporting as accessible as possible.  If you have any
questions or require further information on our Council’s performance please
contact:
The Corporate Policy and Performance Team
Tel:  01294 310000  Email:  NorthAyrshirePerforms@north-ayrshire.gov.uk
Reports can be viewed at www.north-ayrshire.gov.uk/performance
206

Page 207

NORTH AYRSHIRE COUNCIL 
24 September 2026 
Audit & Scrutiny Committee
Title: Annual Assurance Statement to the Scottish Housing
Regulator 2025/26
Purpose: To advise the Committee of the Council’s Annual Return on the
Charter 2025/26 submission and to seek approval for the
submission of the Annual Assurance Statement to the Scottish
Housing Regulator.
Recommendation: That the Committee:
(i) notes the Annual Return on the Charter submission
2025/26
(ii) notes the supporting evidence provided at Appendix 2 to
demonstrate compliance with the regulatory framework
and relevant legislation
(iii) notes the Council’s areas of non-compliance detailed at
paragraph 2.27; and
(iv) authorises the Chair to sign the Annual Assurance
Statement 2025/26 at Appendix 1 for submission to the
Scottish Housing Regulator. 
1. Executive Summary 
1.1 The Scottish Housing Regulator’s framework for the regulation of social housing in
Scotland includes the requirement for an Annual Assurance Statement to be
submitted alongside the Annual Return on the Charter (ARC). The Statement must be
approved by the appropriate Committee within the organisation, prior to submission to
the Scottish Housing Regulator (SHR) by 31 October of each year. A copy of this
year’s statement is provided at Appendix 1.
1.2 The 2025/2026 ARC was submitted to the Regulator on 29 May 2026. This committee
report provides information on the performance reported in the ARC 2025/26,
highlighting areas of high or improving performance, areas requiring improvement,
and areas of non-compliance. The report also provides information at Appendix 2 on
how the Council gains assurance that it is compliant with the regulatory framework. 
1.3 Endorsement of the Annual Assurance Statement 2025/26 will ensure that the Council
complies with regulatory requirements set out in the Housing (Scotland) Act 2010. 
2. Background
Agenda Item 4
207

Page 208

2.1 The Housing (Scotland) Act 2010 sets out the statutory objectives, functions, duties,
and powers of the SHR, a non-ministerial department responsible for regulating social
housing in Scotland. 
2.2 In 2012, the Scottish Government’s Social Housing Charter was established. It sets
out the standards and outcomes that tenants, homeless people, homeowners, and
gypsy/travellers can expect from social landlords. This is monitored via landlords’
Annual Return on the Charter submissions to the SHR. 
2.3 In February 2019, the Scottish Housing Regulator issued a revised framework for the
regulation of social housing in Scotland. The new framework includes the requirement
for landlords to submit an Annual Assurance Statement which has been agreed by a
Board or Committee within the organisation. On 1 April 2024 the SHR published a new
Regulatory Framework and guidance for social landlords to ensure the safeguarding
and promotion of the interests of current and future tenants, people who are
homeless, factored owners and Gypsy/ Travellers. 
2.4 The Annual Assurance Statement is confirmation that, as a landlord, the Council: 
• meets all legal duties and responsibilities, and adheres to relevant guidance and
the requirements of other regulators
• meets its statutory duties to prevent and alleviate homelessness
• adheres to statutory guidance from the Scottish Housing Regulator
• takes account of regulatory advice from the Scottish Housing Regulator and from
other regulators
• complies with all regulatory requirements
The Council must also confirm plans to address any instances where there is a
material non-compliance and notify the SHR about any material changes in their level
of assurance during the year. 
2.5 North Ayrshire Council’s ARC 2025/26 was submitted to the SHR on 29 May 2026.
The return provides details of the Council’s performance across a range of indicators
within the Charter outcomes. 
2.6 The SHR requires landlords to provide assurance in their Statement that they have
developed an effective approach to the collection of equalities information and that
they have considered how they can adopt a human rights approach in their work. 
2.7 As a landlord, North Ayrshire Council collects data relating to each of the protected
characteristics for existing tenants, new tenants, people on waiting lists, governing
body members, staff, people who are at risk of homelessness and service users on
our Gypsy/Traveller site. A systems review is continuing, alongside our partner
landlords within the North Ayrshire Housing Register, which incorporates further
development of our approach to collation of equalities data. 
2.8 Access to good quality housing is recognised as a basic human right and providing
this to everyone in North Ayrshire is a key priority, including ensuring accommodation
is provided to homeless households, tenancy sustainment, a dedicated site to meet
the needs of Gypsy/Travellers, standards of Council-owned accommodation are well
maintained and continuing to deliver our new house building programme.
208

Page 209

Performance 
2.9 Each year, social landlords submit performance information to the Scottish Housing
Regulator (SHR) demonstrating how they have performed against the standards and
outcomes set out in the Scottish Social Housing Charter. 
Following the SHR’s publication of the 2025/26 national data, officers assessed North
Ayrshire Council's performance against other Scottish local authority landlords. The
analysis considered both the Council's ranking and the performance quartile achieved
for each indicator. 
The comparison included 26 local authority landlords. Six authorities were excluded
from the analysis as they either had no housing stock or managed 10 or fewer self-
contained units: 
• Argyll and Bute Council
• Comhairle nan Eilean Siar (Western Isles Council)
• Dumfries and Galloway Council
• Glasgow City Council
• Inverclyde Council
• Scottish Borders Council 
A total of 50 ARC indicators were included in the analysis. Four indicators were
excluded as North Ayrshire Council returned a nil value and meaningful comparison
was therefore not possible. 
Of the remaining 46 indicators, North Ayrshire Council's performance was: 
• Top quartile: 15 indicators (32.6%)
• Second quartile: 16 indicators (34.8%)
• Third quartile: 9 indicators (19.6%)
• Fourth quartile: 6 indicators (13.0%) 
Overall, North Ayrshire Council achieved performance within the top two quartiles for
31 of the 46 indicators (67.4%), demonstrating that the majority of services continue
to perform at or above the median level when compared with other Scottish local
authority landlords. 
While the analysis highlights areas of strong performance, it also identifies a number
of indicators where performance is within the lower quartiles. These areas are subject
to ongoing performance monitoring and improvement activity to support continued
service improvement and positive outcomes for tenants. 
A detailed presentation on the Council’s comparative housing performance is being
arranged for an Audit and Scrutiny Committee later this year.
2.10 Performance against each of the indicators is being scrutinised to enable plans to be
developed to sustain areas of high performance and address areas for improvement.
2.11 Housing Services has a well-developed Performance Management Framework in
place, which ensures the monthly scrutiny of performance information with regards to
the SHR/ARC, Council Plan and other key performance-related data.
209

Page 210

2.12 In addition, the Housing Transformation Board continues to monitor improvement
workstreams to increase performance in areas such as rent arrears, aids and
adaptations, voids management and the housing repairs policy. 
2.13 Following the Scottish Housing Regulator's (SHR) review of the Annual Return on the
Charter (ARC) indicators in 2024, a range of new performance indicators were
introduced for reporting for 2025/26. These indicators are as follows: 
• Indicator 29 (EICR): Measures the number of missed five-year electrical safety
inspections where appropriate certification and records are required
• Indicator 30 (Fire safety): Records the number of properties that do not meet the
Scottish Tolerable Standard in relation to smoke and heat alarms, including
monitoring of installation and renewal dates
• Indicator 31 (Damp and mould resolution time): Measures the number of working
days taken to resolve damp and mould cases from initial report to completion,
categorised by cause (condensation, structural defects, or other factors)
• Indicator 32 (Reopened damp and mould cases): Measures the percentage of
damp and mould cases that were previously resolved but subsequently reopened
within the same reporting year
• Indicator 33 (Open damp and mould cases): Records the total number of
unresolved damp and mould cases remaining open at the end of the financial year 
As these indicators have been introduced for the first time in 2025/26, no comparative
performance data is available for 2024/25. 
2.14 The information provided below identifies key areas of high or improving performance
as reported in our ARC return for 2025/26, alongside areas where there has been a
decline, or where improvement is required. 
Areas of high or improving performance 
2.15 Tenant satisfaction results are based on our most recent tri-annual tenant satisfaction
survey, undertaken during 2024/25, which informs our Annual Return on the Charter
(ARC) submissions until the next survey has been undertaken. Key performance
measures include overall satisfaction with landlord services (91.8% in 2025/26, up
from 88.7% in 2021) and satisfaction with how well we keep tenants informed about
services and decisions (86.8%, up from 85.5% in 2021). Satisfaction with opportunities
to participate in decision-making remains high at 89.7% (91.9% in 2023/24). 
2.16 The average length of time taken to complete emergency repairs decreased slightly,
from 2.72 hours in 2024/25 to 2.68 hours in 2025/26. 
2.17 There has been a significant improvement in performance relating to adaptations
work, with the number of households waiting for an adaptation to their home
decreasing from 232 at 31 March 2025, to 25 at 31 March 2026. The average number
of days to complete an approved adaptation also decreased significantly, from 57.25
days in 2024/25 to 43.53 days in 2025/26. As part of the Housing transformation
programme, a joint improvement group, with representation from the Health and
Social Care Partnership, Housing, Building Services and Property Management and
Investment, continues to review demand for adapted properties, alongside existing
210

Page 211

processes, to ensure the best possible service outcome for tenants and best value for
their rent. 
2.18 Gross rent arrears as a percentage of rent due decreased from 8.03% in 2024/25 to
7.10% in 2025/26. While this represents an improvement, reducing rent arrears
remains a key priority and is a focus of the Housing Transformation Board’s work; this
includes development of a new Income Maximisation Strategy. Housing Operations
staff actively apply the Council's arrears escalation process and pursue legal action
where arrears exceed a certain threshold. Dedicated Housing Support and Welfare
Rights teams work with tenants to maximise income and provide early intervention
and personalised support, recognising the financial pressures many households
continue to face. Rent arrears performance is closely monitored by the Housing
Services Leadership Team on a monthly basis, with detailed reporting at both locality
and housing patch level to ensure targeted action and continuous improvement. 
2.19 The number of court actions resulting in eviction increased from 13.37% in 2024/25 to
15.86% in 2025/26. Of the 145 court actions resulting in 23 evictions in 2025/26, 22
were due to rent arrears and one was due to antisocial behaviour. 
Areas with a decline in performance or requiring improvement 
2.20 The average length of time taken to complete non-emergency repairs increased from
6.60 days in 2024/25 to 8.46 days and is over the Council’s 7-day average but within
the 20-day target. Performance has dipped due to reduced labour resources, a
national shortage of skilled tradespeople, and the loss of experienced planning staff.
Despite exploring all recruitment options, including agency workers and semi-skilled
operatives, challenges in attracting suitably skilled candidates have continued to
impact service delivery and operational support capacity. Our repairs and
maintenance policies and processes are an area of focus within the Housing
transformation programme. 
2.21 Satisfaction levels of tenants who had repairs or maintenance carried out in the last 12
months has decreased slightly from 95.27% in 2024/25 to 93.72% in 2025/26, based
on 2,387 tenant responses received in the year. The response rate should increase
over the next reporting year, as operatives’ electronic devices have been reconfigured
to require a satisfaction survey to be carried out by the tenant following the completion
of every job on site. 
2.22 The percentage of antisocial behaviour cases resolved during 2025/26 was 82.45%, a
slight decrease against last year’s performance of 85.65%. However, our performance
against locally agreed targets is 98.06% of cases resolved within agreed timescales,
which exceeds the target of 94%. 
2.23 The average time taken to re-let properties increased from 27.89 days in 2024/25 to
35.97 days in 2025/26. Void performance continues to be impacted by delays in
resolving meter issues with utility suppliers. This matter has been recognised
nationally and has been escalated to the Scottish Government for action.
Performance was also affected by a high number of long-term voids being brought
back into use following capital refurbishment programmes. A cross-service working
group has been established to review and analyse the Council’s void processes. The
aim of the group is to scrutinise current working practices and turnover performance to
identify improvements and efficiencies.
211

Page 212

2.24 Approaches for homeless assistance in North Ayrshire decreased by 9.54% in
2025/26 compared to the previous year. However, demand for temporary
accommodation remains high, with only a 3% reduction in the number of households
in temporary accommodation as at 31 March 2026. Relationship breakdown was the
main reason for homelessness in North Ayrshire during 2025/26, accounting for 207
approaches (19%). This is followed by people being asked to leave the family home,
which accounted for 179 (17%) approaches. 
2.25 North Ayrshire's housing system continues to face increasing pressure; however, a
range of measures are in place to respond to them. These include increasing housing
supply through new build developments and utilisation of the Housing Acquisition
Strategy, minimising void periods to maximise the availability of housing, and
managing homelessness demand through the provision of temporary and permanent
accommodation. Housing Operations and Homelessness Services operate through
locality-based, integrated teams, enabling early intervention and prevention activity
tailored to local needs. This approach supports a coordinated response to tenants and
residents and helps resolve issues at the earliest opportunity. The Council's
Homelessness Taskforce brings together internal services and partner organisations
to analyse homelessness trends, demand pressures and associated risks. A key focus
of the Taskforce is the development of a new Homelessness Prevention Strategy,
aligned with the Housing (Scotland) Act 2025, which will set out a coordinated,
prevention-focused approach to reducing homelessness and improving outcomes
across North Ayrshire. 
Area of compliance 
2.26 During 2025/26, there were no gas failures, resulting in achieving 100% compliance in
relation to gas safety. 
Area of non-compliance
2.27 During 2025/26, 6,531 properties were reported as non-compliant with the
requirement for an Electrical Installation Condition Report (EICR) to be completed
within the previous five years. However, at the year-end, only 126 properties did not
hold a valid EICR; the larger figure reflects properties that had exceeded the
prescribed five-year inspection interval.
2.28 The reported compliance position reflects a change in the way electrical safety
performance is measured rather than a deterioration in the safety of the housing
stock. The new indicator requires properties to have an EICR completed within the
previous five years. Historically, a number of properties were inspected under a ten-
year testing cycle and therefore do not meet the revised reporting requirement despite
continuing to hold valid electrical certification and remaining electrically safe.
2.29 Implementation of the revised five-year testing cycle was further impacted by delays
to the electrical testing programme during the COVID-19 period and subsequent
access challenges. As a result, a significant proportion of the housing stock fell
outside the new five-year reporting threshold over a relatively short period, creating an
apparent reduction in compliance performance.
2.30 The Council's priority has been to ensure the ongoing electrical safety of tenants'
homes. Current records confirm that over 99% of properties hold a valid EICR, with
212

Page 213

the small number of outstanding cases primarily attributable to difficulties in securing
access. Programmes are now in place to align all properties with the five-year cyclical
inspection regime and achieve full compliance with the revised reporting
requirements.
2.31 The reported performance should therefore be viewed as a technical reporting matter
arising from changes to regulatory measurement criteria rather than an indication of
widespread electrical safety concerns within the housing stock. 
2.32 All efforts were made to ensure electrical safety compliance at the earliest opportunity
and appropriate records were kept; officers have assessed this a material non-
compliance and the SHR was informed during 2025/26 of the expected outcome.
Property Management and Investment have been providing monthly updates to the
SHR in relation to both gas and electrical safety compliance since January 2023. For
2026/27, the EICR compliance figure as at the end of July 2026 was 98.96%. 
2025/26 ARC data validation 
2.33 The Council's Annual Return on the Charter (ARC) for 2025/26 was completed and
submitted to the Scottish Housing Regulator on 29 May 2026 in compliance with the
required submission deadline of 31 May 2026. The return was prepared using the
Scottish Housing Regulator's ARC Technical Guidance to ensure that performance
information was collected, calculated and reported consistently and accurately. 
2.34 To strengthen assurance around the accuracy and quality of the ARC submission,
Housing Services undertook a comprehensive review of all indicators during the
preparation of the 2025/26 return. This included validation of data sources, calculation
methodologies and supporting evidence to ensure compliance with the Regulator's
requirements. 
2.35 Housing Services also incorporated supplementary guidance and good practice issued
by the Scottish Housing Network (SHN) in relation to the interpretation and reporting
of ARC indicators. This supported a consistent approach to data collection and
performance reporting across service areas. 
2.36 During 2024/25 and 2025/26, the Scottish Housing Network carried out two
independent validation visits to review the Council's arrangements for the collection,
verification and reporting of ARC data. The findings and recommendations arising
from these reviews were considered and incorporated into the preparation of the
2025/26 ARC submission. 
2.37 The validation activity confirmed that appropriate governance, quality assurance and
performance management arrangements are in place to support the accurate
reporting of ARC information. Where opportunities for improvement were identified,
these have been reflected within service procedures and guidance to further
strengthen future reporting arrangements. 
2.38 Collectively, the application of the Scottish Housing Regulator's Technical Guidance,
supplementary advice provided by the Scottish Housing Network, and the
independent validation undertaken during the year provides a high level of assurance
213

Page 214

regarding the accuracy and robustness of the Council's 2025/26 ARC submission and
demonstrates the service's commitment to continuous improvement. 
Assurance 
2.39 The overall performance of the Housing Service is continuously reviewed by the Head
of Service and Housing Senior Management Team on a monthly basis, with key
performance information and action plans presented to the North Ayrshire Network,
Housing Business Plan Group and Council’s Cabinet regularly during each year. 
2.40 Several ARC indicators also form part of the corporate performance monitoring
framework, scrutinised by Chief Officers and elected members. 
2.41 The ARC 2025/26, which can be accessed at North Ayrshire Council | Scottish
Housing Regulator demonstrates the Council’s performance against the outcomes in
the Scottish Social Housing Charter. 
2.42 Supporting evidence to demonstrate compliance with the regulatory framework and
relevant legislation is attached at Appendix 2. 
2.43 The Annual Assurance Statement, which is attached at Appendix 1, confirms that the
Council has complied with the regulatory framework, all standards, and outcomes. It
highlights North Ayrshire’s material non-compliance with our legal responsibilities
around electrical safety. It also confirms the equalities data currently captured, and
how North Ayrshire adopts a human rights approach in our work. This Statement will
be made available to tenants as part of the Council’s performance reporting process. 
3. Proposals 
3.1 It is proposed that the Committee (i) notes the Annual Return on the Charter
submission 2025/26; (ii) notes the supporting evidence provided at appendix 2 to
demonstrate compliance with the regulatory framework and relevant legislation; (iii)
notes the Council’s areas of non-compliance detailed at paragraph 2.27; and (iv)
authorises the Chair to sign the Annual Assurance Statement at Appendix 1 for
submission to the Scottish Housing Regulator.
4. Implications/Socio-economic Duty
Financial
4.1 None 
Human Resources 
4.2 None 
Legal 
4.3 Approval of the Annual Return on the Charter submission 2025/26 and supporting
evidence, and signature of the Annual Assurance Statement, will ensure that the
Council complies with regulatory requirements set out in the Housing (Scotland) Act
2010.
214

Page 215

Equality/Socio-economic 
4.4 As a landlord, data is collated relating to each of the protected characteristics for
existing tenants, new tenants, people on waiting lists, governing body members, staff,
people who apply to us as homeless and service users on our Gypsy/Traveller site.
This data is used to inform decision making, policy making and day to day service
delivery. 
Climate Change and Carbon
4.5 See paragraph 4.6 below. 
Key Priorities
4.6 The matters referred to in this report contribute to all four of the Council Plan priorities;
Wellbeing, Climate Change, A Sustainable Council and Communities and Local
Democracy by ensuring our housing stock is well maintained, energy efficient and
compliant with all statutory duties. Housing Services ensure matters relating to
housing stock investment and compliance are consulted with and reported to our
North Ayrshire Network (NAN) tenants group and other affected services. 
Community Wealth Building 
4.7 N/A 
Islands Communities Impact Assessment 
4.8 N/A 
United Nations Rights of the Child (UNCRC)
4.9 N/A
Consumer Duty 
4.10 N/A 
5. Consultation 
5.1 Consultation has taken place with tenant representatives, and relevant senior officers
within: Housing and Public Protection; Sustainability, Transport and Corporate
Property; Corporate Performance; Health and Social Care Partnership; and the
Scottish Housing Regulator during the preparation of the Annual Return on the
Charter and Annual Assurance Statement. 
David W. Hammond
Executive Director (Communities & Housing)
215

Page 216

For further information please contact Fiona Ellis, Senior Manager (Housing Strategy &
Development), on 01294 324031. 
Background Papers
Click here to enter text.
Report to Audit & Scrutiny Committee on 23 September 2025: Annual Assurance
Statement to the Scottish Housing Regulator 2024/25
216

Page 217

Appendix 1 
North Ayrshire Council
Annual Assurance Statement 
2025/26 
North Ayrshire Council complies with the requirements set out in Chapter 3 of the
Regulatory Framework. North Ayrshire Council is assured that we:
 Adhere to relevant guidance and the requirements of other regulators
 Meet our statutory duties to prevent and alleviate homelessness
 Adhere to statutory guidance from the Scottish Housing Regulator
 Take account of regulatory advice from the Scottish Housing Regulator and from
other regulators
 Comply with all regulatory requirements, encompassing:
• Assurance and notification
• Tenant and service user redress
• Whistleblowing
• Equalities and human rights
• Scottish Social Housing Charter Performance.
We did not meet our legal obligations around tenant and resident safety as we did not
comply with electrical testing legislation for 6,531 properties during 2025/26.  During
2025/26, 6,531 properties were reported as non-compliant with the requirement for an
Electrical Installation Condition Report (EICR) to be completed within the previous five
years. This figure does not represent properties without a valid EICR certificate. At
year-end, 126 properties did not hold a valid EICR; the larger figure reflects properties
that had exceeded the prescribed five-year inspection interval. All efforts were made
to ensure compliance at the earliest opportunity and appropriate records were kept.
The Scottish Housing Regulator was notified of this expected outcome at the earliest
opportunity and was provided with monthly updates during 2025/26. 
As a landlord, we collect data relating to protected characteristics for existing tenants,
new tenants, people on waiting lists, governing body members, staff, people who apply
to us as homeless and service users on our Gypsy/Traveller site.  A systems review
is currently being undertaken alongside our partner landlords within the North Ayrshire
Housing Register, which incorporates further development of our approach to collation
of equalities data within the brief for the review.  We recognise that the right to housing
is a human right and providing this to everyone in North Ayrshire is of the highest
priority with work already taking place across a range of activities. 
North Ayrshire Council’s Audit and Scrutiny Committee has considered sufficient
evidence to give this assurance.  The Annual Assurance Statement was approved by
Audit and Scrutiny Committee on 24 September 2026. 
Authorised by: ________________________ 
Chairperson of the Committee 
Printed name:  ________________________ 
Date:   ________________________
217

Page 218

Appendix 2 
North Ayrshire Council
Housing Services 
Annual Assurance
Statement 2025/26 
Supporting Evidence
September 2026 
218

Page 219

Appendix 2 
Introduction 
In February 2019, the Scottish Housing Regulator (SHR) introduced a revised Regulatory Framework
for Social Housing in Scotland. This framework requires landlords to submit an Annual Assurance
Statement, approved by the relevant Board or Committee, confirming compliance with the requirements
set out in Chapter 3 of the Regulatory Framework. 
This document provides the evidence supporting North Ayrshire Council's Annual Assurance Statement
2025/26 and demonstrates that the Council:
• Complies with relevant legislation, statutory guidance and the requirements of other regulators
• Meets its statutory duties to prevent and alleviate homelessness
• Takes account of guidance and regulatory advice issued by the SHR and other regulators
• Meets the SHR's regulatory requirements relating to: 
o assurance and notification
o tenant and service user redress
o tenant and resident safety
o whistleblowing
o equalities and human rights
o Scottish Social Housing Charter performance 
As a landlord, the Council must comply with all legal duties and responsibilities. During 2025/26 we
were unable to achieve full compliance with electrical safety requirements, as some properties did not
have a valid Electrical Installation Condition Report (EICR) in place within the required timescales. This
was primarily due to difficulties gaining access to tenants' homes. This non-compliance has been
reported within our Annual Assurance Statement and is explained in more detail within this supporting
evidence. 
Landlords are expected to maintain comprehensive, accurate and up-to-date information on the
construction, condition and key components of their homes. This information is essential for
demonstrating tenant and resident safety and supporting effective asset management and financial
planning. 
In January 2025, the SHR introduced new Annual Return on the Charter (ARC) indicators relating to
fire safety, electrical safety, dampness and mould. Landlords were required to submit this information
within the ARC 2025/26, for submission to the SHR by May 2026, and arrangements were put in place
within the Council to ensure the necessary data was collected and reported. 
The SHR has also requested assurance that landlords have appropriate plans in place to improve the
collection of equalities data and have begun considering how a human rights-based approach can be
embedded within service delivery and decision-making. 
In March 2026, the SHR wrote to all local authorities and registered social landlords seeking additional
assurance in relation to:
• the quality and completeness of housing stock data
• compliance with the Scottish Government's minimum site standards for Gypsy/Traveller sites. 
This evidence demonstrates the Council's position in relation to these requirements and supports the
assurance provided within the Annual Assurance Statement. 
219

Page 220

Appendix 2 
Regulatory Requirements 
Assurance and notification
We prepare and submit an Annual Assurance Statement to the Scottish Housing Regulator (SHR) each
year in accordance with regulatory requirements. The Statement is made available to tenants and other
service users, and we notify the SHR of any material changes to our assurance position during the
year. 
We are able to demonstrate compliance with our legal obligations relating to housing and
homelessness services, as well as equality and human rights requirements. 
However, we have not achieved full compliance with our legal obligations relating to tenant and resident
safety. During 2025/26, 6,531 properties were reported to the SHR as non-compliant with the
requirement for an Electrical Installation Condition Report (EICR) to be completed within the previous
five years. At 31 March 2026, 126 properties did not hold a valid EICR; the larger figure of 6,531 reflects
those properties that had exceeded the prescribed five-year inspection interval. The primary challenge
in achieving full compliance continues to be difficulties in gaining access to some tenants' homes. 
We have treated this as a material non-compliance and regular monthly progress updates were
provided to the SHR during 2025/26, demonstrating sustained improvement towards full compliance. 
We also notify the SHR of any tenant or resident safety incidents involving the Health and Safety
Executive, or matters raised by other regulatory bodies. There were no such notifications during
2025/26. 
The Gypsy/Traveller site at Redburn Grove, Irvine, continues to meet the Scottish Government's
minimum site standards. To maintain compliance, formal site inspections are carried out quarterly to
identify any defects, health and safety issues, or maintenance requirements. The on-site
Gypsy/Traveller Co-ordinator is responsible for reporting routine repairs and ensuring that all
compliance certificates are current and securely maintained. 
Our Customer Participation Strategy, ‘Customer Connections’, is available to tenants and service users
on the Council website. 
Tenant and service user redress
Information on how to report any concerns around significant performance failures is available to
tenants. Further information is contained in the Scottish Housing Regulator leaflet. 
North Ayrshire Council’s Complaints Handling Procedure is readily available to tenants and other
service users.  It sets out the information they need to exercise their right to complain and seek redress.
Responses are provided within timescales set out in the procedure, in accordance with guidance from
the Scottish Public Services Ombudsman (SPSO). We have mechanisms in place to learn from
complaints and other tenant and service user feedback, in accordance with SPSO guidance. 
Whistleblowing
North Ayrshire Council has a policy and procedure in line with the Public Interest Disclosure Act 1998
for whistleblowing by staff and elected members. This is readily available on the Council website and
promoted through staff bulletins.   
220

Page 221

Appendix 2 
Equalities and human rights
Equality is one of North Ayrshire Council's core values.  The principles of equality and fairness are
central to all Council activities. Our Equality and Children’s Rights Impact Assessment process for all
policies, procedures and proposals ensures we meet legislative requirements. All decisions made by
the Council’s committees include an assessment of equalities implications. 
As a landlord, we collect information on protected characteristics for existing and prospective tenants,
housing applicants, governing body members, employees, people presenting as homeless, and users
of our Gypsy/Traveller site. This information helps inform decision-making, policy development and
service delivery, ensuring our services are accessible, inclusive and responsive to the diverse needs
of our customers. We are currently undertaking a housing management system review with our
partners in the North Ayrshire Housing Register and have included enhanced equalities data collection
within the project scope to strengthen our approach. 
We recognise that access to good quality housing is a fundamental human right and a key priority for
North Ayrshire Council. We support this through a range of activities, including providing
accommodation for homeless households, delivering housing support services to help sustain
tenancies, maintaining a dedicated site for Gypsy/Travellers, ensuring Council housing continues to
meet the Scottish Housing Quality Standard (SHQS), and carrying out property adaptations to improve
accessibility for disabled residents. 
Scottish Social Housing Charter Performance
We submit our Annual Return on the Charter to the Scottish Housing Regulator in accordance with
published guidance. We have agreed our approach to this through the North Ayrshire Network (NAN),
a group of representatives from the various Registered Tenant Organisations in North Ayrshire. You
can read about our approach in ‘Customer Connections,’ our Customer Participation Strategy 2023 -
2028. 
Each year, we report on performance in our autumn edition of Tenancy Matters. The NAN work with
us to agree the content of the report, which includes comparisons with previous years, other landlords
and national performance. Within this report we identify how we will address areas for improvement
and ask for feedback on our approach. 
Standard 1 – The customer / landlord relationship 
Outcomes: 
Equalities 
We promote equality and embrace diversity in all parts of Housing Services. All the information we
produce is in line with the Council’s Communications Strategy. All leaflets, and a range of documents,
are published in plain English and can be made available in large print, braille, tape, or CD, and can
be translated on request.  For information published digitally, North Ayrshire Council is committed to
making its website accessible, in accordance with the Public Sector Bodies (Websites and Mobile
Applications) (No. 2) Accessibility Regulations 2018. 
Communication 
Housing Services provide a comprehensive range of information which is made available in leaflets,
on the Council website and on social media. The Tenant Editorial Panel approves all leaflets prior to
issue to ensure they are fit for purpose and easy to understand. Our ‘tenant approved’ logo shows
221

Page 222

Appendix 2 
tenants have endorsed our publications. In recent years we have developed a social media profile
through Facebook to encourage digital engagement with a wider and more diverse customer base. We
have recently created a Housing WhatsApp channel to share important updates directly with tenants. 
We commission an independent organisation to undertake a tenant satisfaction survey at least every
three years. The results of these surveys help us to focus our efforts in improving communication and
participation and understand what is important to our customers. Our last survey took place during
quarter three of 2024/25. 
Participation 
The North Ayrshire Network (NAN) has responsibility for ensuring that we continually improve the way
we deliver services to tenants and customers. Part of their role is to challenge our performance against
the indicators, outcomes and standards in the Charter. Housing Services present performance
information to the Network, both mid-year and prior to submitting the Annual Return on the Charter,
working together to develop our annual report to tenants and communicate any changes from the
Scottish Housing Regulator directly to the group. A recent review of the NAN’s membership has
resulted in an equalities-led approach to recruitment and better representation of North Ayrshire’s
communities. 
We are committed to tenant-led scrutiny of housing services to ensure that we continue to meet our
tenants' needs and aspirations. Each year our Tenant Inspection Panel identify one service area to
scrutinise and independently review performance, policy and processes and customer experience, with
support from housing officers. Scrutiny provides an opportunity for tenants to drive improvement in the
services most important to them. 
We have reviewed/ relaunched our Customer Participation Strategy for 2023 – 28, which encompasses
the requirements of the Scottish Social Housing Charter and relevant Council Plan priorities.
Collectively these three documents emphasise the importance of supporting our communities’ tenants
and residents to grow and develop opportunities for active engagement and participation for all citizens,
by listening to local needs and aspirations. 
Alongside relaunching the Customer Participation Strategy 2023–2028, we are delighted to report that
during 2026 North Ayrshire Council successfully attained its third successive Gold award from Tenants
Information Service (TIS) in Scrutiny Approved Accreditation. The Council was first awarded gold
accreditation in 2016 and successfully retained its gold standard in 2021 for a further three-year term.
In addition, in November 2022 we received gold level ‘Excellence in Tenant Participation’ re-
accreditation from Tenant Participation Advisory Service (TPAS Scotland) for 2023-2025. 
Our latest tenant satisfaction survey told us that tenants’ opportunities to take part in decision-making
processes has fallen slightly - from 92% in 2021 to 90% in 2024 - but remains high in comparison to
the Scottish council housing average of 82% (Knowledge Partnership 2025). The survey found that 9%
of survey respondents would prefer to participate and share their views via survey, while 77% have
stated they are not interested in tenant participation activities. This feedback will be addressed through
delivery of the Customer Participation Strategy, by reviewing our tenant participation structures through
an equalities-led approach to increase participation and satisfaction. 
Standard 2 – Housing quality and maintenance 
Outcomes:
222

Page 223

Appendix 2 
Quality of housing 
Our housing stock is in good condition and is proactively maintained and upgraded to ensure it
remains safe, sustainable and meets tenants' needs. Through targeted investment and planned
maintenance programmes, we ensure properties continue to meet the Scottish Housing Quality
Standard (SHQS) and Energy Efficiency Standard for Social Housing (EESSH). These programmes
are designed to maximise the lifespan of key components, reduce future repair and maintenance
costs, anticipate changes in regulatory standards and support the long-term sustainability of our
homes. 
To strengthen our asset management approach, we have undertaken a self-assessment of our asset
management processes and data, informed by the Scottish Housing Regulator's guidance on
Integrated Asset Management (IAM). To support this work, the Council commissioned external
support to develop an IAM model that provides a comprehensive assessment of housing stock
performance. The model draws together data from the Council’s NEC Housing, Apex and URM
systems, incorporating factors such as property condition, repair costs and volumes, deprivation data,
future investment requirements, housing demand and tenancy information. This self-assessment will
inform more effective strategic planning and investment decision-making. 
During 2025/26, we achieved 100% compliance with gas safety requirements, with no missed
inspections or gas safety failures. This is a small improvement on 2024/25 performance, when one
failure was reported. 
We continue to work towards full compliance with electrical safety requirements. Significant
improvements have been achieved through a targeted improvement programme; however, access to
a small number of properties remains a challenge due to tenant refusal. A cross-service working
group established in 2023 has overseen the implementation of an improvement plan, resulting in
sustained performance improvements during 2024/25 and 2025/26. While our objective remains
100% compliance, achieving this continues to be difficult where access cannot be secured. The use
of the Council's Access Policy remains an option but is resource-intensive for both the Council and
contractors. 
In relation to smoke detection standards, three properties were recorded as non-compliant during
2025/26. These properties were awaiting demolition and were therefore exempt from the
requirement. 
The Council has a dedicated Contracts, Compliance and Maintenance team responsible for ensuring
compliance with statutory requirements, including lift maintenance and legionella management. In
addition, a dedicated Asbestos Compliance Officer supports all refurbishment and alteration works to
ensure compliance with relevant legislation and safety standards. 
Condensation, Dampness & Mould 
North Ayrshire Council has a robust system for managing dampness, mould and condensation across
our housing stock. A comprehensive strategy and end-to-end process are in place to ensure cases
are identified, prioritised and resolved effectively, including joint working where health concerns are
identified. 
A detailed process map supports a risk-based approach to case management, with follow-up
inspections undertaken to assess the effectiveness of interventions and inform longer-term asset
223

Page 224

Appendix 2 
management planning. Ventilation standards have also been enhanced, with humidity-tracking
extractor fans now installed as the minimum standard in all relevant projects, voids and repair works. 
Building Services Inspection Officers are appropriately qualified and experienced, with specialist
dampness and mould expertise available within the team through industry-recognised Certificated
Surveyor of Timber and Dampness in Buildings (CSTDB) accreditation. Further specialist training is
being rolled out to Building Services staff, alongside awareness training for Housing Officers and
technical training for operational teams. 
Preparations for the introduction of Awaab's Law in October 2026 are well advanced. A dedicated
‘Hazard Case’ module is being developed within the repairs management system to improve case
recording, monitoring, reporting and compliance with statutory requirements. Processes have been
reviewed to ensure reporting timescales commence from the point of awareness, regardless of how
concerns are raised. 
Additional staffing resources have been approved, and recruitment is underway to support
anticipated increases in demand, surveying and case management requirements. Contractor
procurement arrangements have also been strengthened to provide additional capacity when
required. While challenges remain around the availability of specialist trades and experienced staff,
mitigating measures are in place to maintain service delivery. 
A communications programme is planned to raise awareness of residents' rights and responsibilities
under Awaab's Law, including reporting routes and expected timescales. 
During 2025/26, the Council managed 1,090 dampness and mould cases, with an average resolution
time of 34.34 days. As this is a new performance indicator, no comparative data is available for
previous years. 
Repairs, maintenance, and improvements 
North Ayrshire Council is committed to delivering high-quality, efficient and effective reactive and
planned maintenance services for tenants and factored owners, while maintaining high levels of
customer satisfaction. Our Repairs Policy sets out how repairs and maintenance services are delivered
and supports our commitment to providing quality homes that meet the needs of current and future
tenants. The policy is currently being reviewed through the Housing Transformation Board workstream
and will be updated in consultation with tenant representatives. 
During 2025/26, the average time taken to complete emergency repairs improved slightly from 2.72
hours to 2.68 hours. The average completion time for non-emergency repairs increased from 6.60 days
to 8.46 days. Although performance reduced, it remained within the targets set out in our Repairs Policy.
Contributing factors included reduced workforce capacity, a national shortage of skilled tradespeople
and the loss of experienced planning staff. Despite efforts to recruit permanent employees, agency
workers and semi-skilled operatives, challenges in attracting suitably qualified staff continued to impact
service delivery. 
Tenant satisfaction with repairs and maintenance services reduced slightly, increasing from 95.27% in
2024/25 to 93.72% in 2025/26, based on feedback from 2,387 tenants. 
The Council continues to monitor and review its void management processes to minimise the time
properties remain empty and maximise the availability of housing. During 2025/26, the average time
taken to re-let a property increased from 27.89 days to 35.97 days. Performance was affected by
224

Page 225

Appendix 2 
ongoing issues relating to utility meter installations and transfers, which has been recognised nationally
as a significant issue and is being pursued by the Scottish Government due to its impact on housing
supply and homelessness across the country. Targeted capital investment works to bring long-term
void properties back into use also impacted performance in the year. 
An overarching Voids Transformation Strategic Working Group was established in 2024. The group
includes representation from Housing Services, Building Services and Property Maintenance and
Investment (PMI) and aims to improve efficiency, reduce costs, and allocate resources more effectively
while maintaining the quality and appeal of properties for prospective tenants. 
Following a review of the voids process during 2025/26, a major change was implemented on 20 April
2026, with Building Services taking responsibility for void inspections, scoping of works and post
inspections to remove duplication of officer time and allow delivery of a more efficient and effective
voids management service. The benefits of the new process are evidenced by an improvement in Q1
2026-27 relets performance. 
Despite the increase in re-let times, North Ayrshire Council ranked third within its SHN benchmarking
peer group and eighth among all Scottish local authorities in 2025/26, demonstrating strong overall
performance in comparison with other landlords. 
Standard 3 – Neighbourhood and community 
Outcome: 
Estate management, antisocial behaviour, neighbour nuisance, and tenancy disputes 
Estate management encompasses a wide range of activities, including new tenant visits, permissions
for alterations such as garages and driveways, addressing abandoned tenancies, untidy gardens,
neighbour disputes, pet-related issues, abandoned vehicles, graffiti, and fly-tipping. A comprehensive
Estate Management Procedure Manual is in place to ensure the Council meets its responsibilities as a
landlord and supports tenants in meeting their obligations under their Tenancy Agreement. 
Where tenancy breaches occur, we work with tenants to resolve issues and sustain tenancies wherever
possible. However, where tenants are unwilling to comply with their tenancy conditions, appropriate
and proportionate enforcement action may be taken. Our Estates Officers take a proactive approach
to estate management, focusing on early intervention and prevention rather than responding solely to
issues as they arise. 
The Safer North Ayrshire Partnership (SNAP) brings together the Council, local communities and
partner organisations to prevent crime and antisocial behaviour and respond effectively to emerging
issues. 
During 2025/26, reports of antisocial behaviour increased by 14% compared with the previous year.
Despite this increase, performance remained strong, with 98.06% of cases resolved within locally
agreed timescales, against a target of 94%. 
Our most recent Tenant Satisfaction Survey, undertaken in 2024/25, found that 91.3% of tenants were
satisfied with the management of their neighbourhood. This represents a significant improvement on
the previous survey result of 80%, demonstrating continued progress in delivering effective
neighbourhood management services. 
225

Page 226

Appendix 2 
Standard 4 – Access to housing and support 
Outcomes: 
Housing options and access to social housing 
The North Ayrshire Housing Allocation Policy sets out how social housing is allocated through the
North Ayrshire Housing Register (NAHR). Partner landlords have a responsibility to ensure the policy
complies with legislative and regulatory requirements and supports the outcomes of the Scottish Social
Housing Charter. 
During 2025, NAHR partners completed a comprehensive review of the Policy to ensure it remained fit
for purpose and reflected current legislation, regulation, housing need and housing supply. The review
was supported by detailed modelling and informed by operational experience, stakeholder engagement
and consultation. A clear project plan was developed to guide the review process, including timescales,
resource requirements and opportunities for stakeholder involvement. The revised Policy was approved
by Cabinet on 30 September 2025. 
Housing Services and Building Services work closely with the North Ayrshire Health and Social Care
Partnership (NAHSCP) who – in accordance with the Integration Scheme – manage the process for
aids and adaptations to help tenants live independently in their homes. Regular meetings are held to
assess demand, monitor expenditure and review performance. The NAHSCP's Adaptations Criteria
and Policy provide a consistent framework for assessing need, while monthly multi-agency case
reviews ensure appropriate decisions are taken for complex cases. Occupational Therapy staff also
consider wider housing options for applicants with long-term health conditions where adaptations may
not be the most suitable solution. This collaborative approach helps ensure resources are targeted
effectively and those most in need receive timely support. 
Performance in this area improved significantly during 2025/26. The number of households waiting for
an adaptation at the end of the year reduced from 232 to 25, while the average time taken to complete
an approved adaptation decreased from 57.25 days to 43.53 days. A joint improvement group
comprising Housing Services, Building Services, Property Management and Investment, and the
Health and Social Care Partnership continues to review demand and working practices to deliver the
best outcomes and ensure value for money for tenants. 
Homeless people 
Approaches for homelessness assistance in North Ayrshire decreased by 9.5% during 2025/26
compared with the previous year. Despite this reduction, demand for temporary accommodation
remains high. As at 31 March 2026, 276 homeless households were living in temporary
accommodation, compared with 285 households at the same point in 2025, a reduction of 3%. 
Relationship breakdowns were the most common cause of homelessness during 2025/26,
accounting for 207 applications (19%). This was followed by applicants being asked to leave the
family home, which accounted for 179 applications (17%). Applications from households fleeing
domestic abuse remained significant, with 167 applications (16%) recorded during the year,
compared with 171 applications (14%) in 2024/25. 
North Ayrshire Council remains committed to the principles of Rapid Rehousing, which continue to
underpin both national and local approaches to tackling homelessness. While the original Rapid
Rehousing Transition Plan was a time-limited national change programme, rapid rehousing is now
226

Page 227

Appendix 2 
embedded within core service delivery and supported through Scottish Government funding,
performance monitoring and wider homelessness prevention policy. 
Although homelessness applications have reduced, the housing system continues to face significant
pressures. Demand for temporary accommodation remains high and access to settled housing is
increasingly challenging. Sustained reductions in homelessness will require continued innovation,
earlier intervention and strong partnership working, with a focus on preventing homelessness and
reducing repeat homelessness wherever possible. 
Through the North Ayrshire Homelessness Taskforce, the Council and its partners are developing
North Ayrshire's first Homelessness Prevention Strategy 2026-2031. The strategy will establish a
prevention-focused, whole-system approach to homelessness, informed by stakeholder engagement,
service data and local evidence of homelessness risk. It will align with the Housing (Scotland) Act
2025 and emerging Ask and Act duties, strengthening arrangements to identify and respond to
homelessness risk at the earliest opportunity. 
The strategy will focus on early intervention, strengthening support pathways for households most at
risk, improving partnership working across public and third-sector organisations, and helping people
sustain accommodation. The Strategy will be supported by a detailed action plan and performance
framework, overseen by the Homelessness Taskforce. 
In summary, North Ayrshire Council is committed to delivering a prevention-led homelessness
system, underpinned by Rapid Rehousing principles, to ensure fewer people experience
homelessness and those who do are supported to access settled, sustainable housing as quickly as
possible. 
Standard 5 – Getting good value from rents and service charges  
Outcomes: 
Value for money
Our Housing Revenue Account (HRA) 30-Year Business Plan provides a clear strategic and financial
framework to support effective short, medium and long-term planning. It sets out how we will deliver
key priorities, including maintaining compliance with the Scottish Housing Quality Standard (SHQS),
investing in existing homes, delivering our new build programme and ensuring sustainable rent-
setting arrangements. 
The Business Plan is managed through a collaborative approach involving elected members, tenant
representatives and officers from Housing Services, Property Management and Investment, Building
Services and Finance. This ensures decisions are informed, balanced and subject to appropriate
challenge and scrutiny. 
To support the Business Plan, we have robust budget monitoring and performance management
arrangements in place to ensure services deliver value for money while keeping rents affordable for
tenants. These arrangements provide the flexibility needed to respond to an increasingly challenging
economic environment and changing priorities. 
Our Business Plan demonstrates the Council's long-term strategic direction and financial
sustainability over the 30-year planning period. It is reviewed annually and supports our commitment
227

Page 228

Appendix 2 
to delivering value for money through strong financial management, continuous improvement,
efficiency measures and effective contract management. 
Recognising the challenge of maintaining affordable rent increases while managing rising costs,
Housing Services has a Transformation Programme in place to drive service improvement, innovation
and efficiencies. Supported by strong governance and dedicated resources, the programme has
already identified recurring savings of £0.25 million for inclusion within the Business Plan, with further
opportunities being progressed across four key workstreams. 
Our most recent Tenant Satisfaction Survey found that 89.87% of tenants considered their rent to
represent good value for money. 
Rents and service charges
Our rent levels remain broadly in line with the national average, while continuing to support
investment in existing homes and the delivery of our new build programme. 
When setting rents, we consider a range of factors, including the wider economic outlook, rent
affordability, cost-of-living pressures, welfare reform and labour market conditions. We also take
account of increasing costs associated with repairs, maintenance, housing development, supply
chain pressures, achieving net zero ambitions and responding to homelessness. 
Through careful financial planning and ongoing service improvement, we remain committed to
delivering high-quality, efficient and cost-effective services while ensuring rents remain affordable
and sustainable for tenants. 
Standard 6 – Other customers  
Outcomes: 
Gypsy/travellers
North Ayrshire Council recognises Gypsy/Travellers as a minority ethnic community and respects their
right to maintain a nomadic way of life as part of their cultural identity. We are committed to ensuring
that Gypsy/Travellers do not experience discrimination because of their culture or lifestyle. 
The Council manages a permanent Gypsy/Traveller site at Redburn Grove, Irvine, comprising 16
pitches, each with its own amenity block. The site is supported by a dedicated Gypsy/Traveller Co-
ordinator and includes a community room used by a range of partner services, including Education,
Welfare Reform Advice, Tenancy Support and healthcare services. Regular tenants' meetings are also
supported to ensure residents can influence service delivery and future developments. 
Redburn Grove meets the Scottish Government's minimum site standards. However, significant
investment is required to maintain and improve the site. Following consultation with residents, the site
has been included for future redevelopment in the Council's Strategic Housing Investment Plan (SHIP)
2026-2031. 
Our approach to unauthorised encampments complies with Scottish Government guidance. The
Gypsy/Traveller Co-ordinator works with visiting families to assess support needs, provide advice and
facilitate access to services where required. The Council also participates in national COSLA working
groups to help shape policy and share good practice. 
228

Page 229

Appendix 2 
An independent survey undertaken in 2024/25 identified low satisfaction with the management of
Redburn Grove, with concerns largely relating to the condition of the site. The findings are being used
to inform future investment plans and improve services for residents. 
Refugees
North Ayrshire Council’s voluntary involvement in the UK Government’s Resettlement programmes
(UKRS/ARAP/ACRS/ARP) has recently been paused, following our successful delivery of pledges
across each of the various programmes. 
Our Refugee Support Team and Community Planning Partnership colleagues continue to support
resettled refugees who have arrived via the various UK Humanitarian programmes, and provide
housing advice and homelessness assistance to locally placed households following positive asylum
decisions. 
During 2025/26, the Council and community planning partners welcomed and supported twelve
Ukrainian (Homes 4 Ukraine) households and three Afghan (Afghan Resettlement Programme)
households to resettle in North Ayrshire and supported nine asylum seeking households following the
notification of positive asylum decisions.  
Housing Services continues to monitor resettlement provision carefully to ensure we continue to meet
our statutory responsibilities in relation to priority groups, including homeless people.
229