Notice of Meeting and Agenda 
Planning Committee 
Venue:  Council Chambers, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 11 October 2022 
Time:  13:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 80

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of Meeting of 30 August 2022 submitted for Approval 5 - 14 
5          Public Reports
5.1 Planning Enforcement Charter and Update Report and Charter for
Approval - Report by Chief Officer Place
15 - 32
5.2 Update regarding the use of Planning Conditions to cover the
Duration of Planning Permissions - Report by Chief Officer Place
33 - 36
5.3 Appeal Decision - Application for Planning Permission in Principle
- Land at Stobs Farm, Lady Brae, Gorebridge (21/00252/PPP) -
Report by Chief Officer Place
37 - 48
5.4 Application for Planning Permission - Land at Newbyres, Site B,
River Gore Road Gorebridge (22/00066/DPP) - Report by Chief
Officer Place
49 - 80 
(A) TO CONSIDER RESOLVING TO DEAL WITH THE
UNDERNOTED BUSINESS IN PRIVATE IN TERMS OF
PARAGRAPH 13 OF PART 1 OF SCHEDULE 7A TO THE
LOCAL GOVERNMENT (SCOTLAND) ACT 1973 - THE
RELEVANT REPORTS ARE THEREFORE NOT FOR
PUBLICATION; AND  (B) TO NOTE THAT NOTWITHSTANDING
ANY SUCH RESOLUTION, INFORMATION MAY STILL
REQUIRE TO BE RELEASED UNDER THE FREEDOM OF
INFORMATION (SCOTLAND) ACT 2002 OR THE
ENVIRONMENTAL INFORMATION REGULATIONS 2004. 
6          Private Reports
6.1 Outstanding High Hedge Notice requirements within garden of
Ancrum House, 9A Ancrum Bank, Dalkeith
• 13. Information which, if disclosed to the public, would reveal that the
authority proposes—(a) to give under any enactment a notice under or by 
Page 2 of 80

Page 3

virtue of which requirements are imposed on a person; or (b) to make an
order or direction under any enactment. 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 22 November 2022 at 1 pm 
Page 3 of 80

Page 4

Page 4 of 80

Page 5

Minute of Meeting 
Planning Committee 
Date Time Venue
Tuesday 30 August 2022 1.00 pm Via MS Teams 
Present: 
Councillor Imrie (Chair) Councillor Alexander
Councillor Bowen Councillor Cassidy
Councillor Curran Councillor Drummond
Councillor McCall Councillor McEwan
Councillor McKenzie Councillor McManus
Councillor Milligan Councillor Parry
Councillor Pottinger Councillor Russell
Councillor Scott Councillor Smaill
Councillor Virgo Councillor Winchester 
In Attendance: 
Derek Oliver Chief Officer Place
Peter Arnsdorf Planning, Sustainable Growth and Investment Manager
William Venters Principal Solicitor 
James Gilfillan Consultant Policy and Planning
Janet Ritchie Democratic Services Officer 
Planning Committee
Tuesday 11 October 2022
Item No: 4.1 
Page 5 of 80

Page 6

1. Apologies
No apologies were received 
2. Order of Business
The order of business was as set out in the Agenda.
3. Declarations of interest 
Councillor Winchester declared an interest with regards to 5.7 advising that she
had met the Applicant’s representative whilst in the Council buildings but at no
time had she expressed a view on the Application. 
4. Minutes of Previous Meetings 
The minute of the meeting of 14 June 2022 was submitted and approved as a
correct record. 
5. Reports 
Agenda No Report Title Submitted by:
5.1 Planning Obligations Annual Report 2021/2022 Chief Officer Place
Outline of report and summary of discussion
The purpose of this Report was to provide details of: 
a) The framework in which planning obligations secure developer contributions
and governance behind their spent;
b) The planning obligations entered into by the Council in financial year
2021/2022; and
c) The value of contributions paid to the Council in financial year 2021/2022.
The Planning, Sustainable Growth and Investment Manager presented this report
highlighting the background to the report and the use of planning obligations to
secure developer contributions, transfer land, restrict uses of land or require
physical work and how this is governed.  It was noted that planning obligations are
also referred to as a legal agreement or a Section 75 agreement. 
The Planning, Sustainable Growth and Investment Manager also highlighted the
appendices attached to the report which outline the details of the planning
obligations that were entered into in the last financial year 2021/22 (Appendix 1)
and planning obligations received in the same financial year (Appendix 2).
In response to a question raised the Planning, Sustainable Growth and Investment
Manager confirmed that there was no formal legal table on Developer’s contribution
although Midlothian is near the top in this respect. 
Page 6 of 80

Page 7

Decision
The Planning Committee: 
a) Noted the information set out in the report and attached appendices; and
b) Agreed to receive an annual report setting out the level of developer
contributions secured by planning obligations and the sum of developer
contributions recovered within the reporting financial year. 
Action
The Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.2 Tree Protection in Midlothian and the role of
the Trees in mitigating Climate Change and
Protecting and Enhancing Biodiversity. 
Chief Officer Place
Outline of report and summary of discussion
The purpose of this Report was to inform the Committee of the protection given to
trees in Midlothian, their important role in mitigating the effects of climate change
and their contribution to biodiversity. 
At its meeting of 13 June 2022 the Committee requested a report with regard: 
• the current legislation and policies that seek to protect trees and encourage
their planting as part of the development process;
• the value trees have in mitigating against climate change; and
• Trees contribution towards biodiversity.
The Planning, Sustainable Growth and Investment Manager in presenting this
report highlighted the main sections of the report advising that the report sets out
the legislative and regulatory framework with regards to trees. 
Thereafter the Planning, Sustainable Growth and Investment Manager responded
to questions and comments raised and it was noted that the canopy cover in
Midlothian could be given further consideration in the next local plan.  The Planning,
Sustainable Growth and Investment Manager also provided clarification on the
removal of trees and the penalty if these have a TPO and advised that hedgerows
do not have the same protection but further confirmed with the new Scottish
Government National Framework to be adopted next year this will give additional
weight to trees as well as green space. 
Decision
The Planning Committee noted the contents of the report.
Action
The Planning, Sustainable Growth and Investment Manager
Page 7 of 80

Page 8

Agenda No Report Title Submitted by:
5.3 Supplementary Guidance: Low Density Rural
Housing
Chief Officer Place
Outline of report and summary of discussion
The purpose of this Report was to update the Committee on the adoption of the
Low Density Rural Housing Supplementary Guidance. 
In presenting this report the Planning, Sustainable Growth and Investment Manager
advised that following its meeting in June 2022 the Committee agreed to adopt the
Low Density Rural Housing Supplementary Guidance following the formal
consultation process and that the Scottish Ministers were informed of the Council’s
intention to adopt the supplementary guidance.  The Scottish Ministers did not
propose to issue a direction in relation to the guidance and that the Council was
free to adopt the guidance and this guidance is now available on the Council’s
website.
Decision
The Planning Committee noted the contents of the Report. 
Agenda No Report Title Submitted by:
5.4 Guidance on the Role of Councillors in the
Consideration of Pre-Application Consultations
for Major Developments
Chief Officer Place
Outline of report and summary of discussion
The purpose of this Report was to advise the Committee of the recommended
procedures for Councillors in the pre-application process. 
The Planning, Sustainable Growth and Investment Manager outlined the
background to the report and the main procedures as detailed in Section 3 of the
report. 
The Chair highlighted that following the Seminars and Training provided to
Members it was important to put this on the agenda for the newly appointed
Members to clarify the position with regards the proposals at pre-application stage.
Decision
The Committee: 
a)  Noted the established guidance and Committee procedures set out in this
report; 
b)  Agreed to receive a regular report regarding any formal pre- application
consultations by prospective applicants.
Action
The Planning, Sustainable Growth and Investment Manager
Page 8 of 80

Page 9

Agenda No Report Title Submitted by:
5.5 Pre - Application Report regarding Residential
Development, the Erection of a Primary School
and Associated Roads, Landscaping, Open
Space, Footpath/Cycle Ways, Suds and
Infrastructure on Land South East of
Auchendinny, The Brae, Auchendinny, Penicuik
(22/00577/PAC)
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report was to advise the Committee of the submission of a
Proposal of Application Notice (PAN) and corresponding pre application
consultation for residential development, the erection of a primary school and
associated roads, landscaping, open space, footpath/cycle ways, sustainable urban
drainage system (SUDS) and infrastructure on land south east of Auchendinny, The
Brae, Auchendinny, Penicuik. 
The pre application consultation was reported to Committee to enable Councillors
to express a provisional view on the proposed major development. The report
outlines the proposal, identifies the key development plan policies and material
considerations and states a provisional without prejudice planning view regarding
the principle of development. 
The Planning, Sustainable Growth and Investment Manager outlined the main
sections contained within the report and thereafter responded to questions and
comments from the Committee.  In responding to an issue raised with regards to
infrastructure he explained the different processes regarding the different types of
infrastructure and a further comment was made by Councillor McEwan highlighting
that the systems monitoring this should be robust.  It was also noted that with
regards to all future applications that dust suppression is in place and covered
under conditions.   The Planning, Sustainable Growth and Investment Manager in
responding to a further question regarding flooding advised that all housing
schemes install SUDS to ensure there is no detrimental effect on or off site with
regards to flooding, however, if there is a particular problem at present on site it
should not make it worse and generally would improve the situation.
The Planning, Sustainable Growth and Investment Manager also confirmed that
with regards to the map on P63 he would provide an amended map identifying the
different types of land within the orange boundary and this would be attached to the
minute.
Decision
The Committee:
a) Noted the provisional planning position set out in this report; 
b) Noted that any comments made by Members will form part of the minute of
the Committee meeting;
c) Noted that the expression of a provisional view does not fetter the Committee
in its consideration of any subsequent formal planning application.
Page 9 of 80

Page 10

d) Agreed that the Planning, Sustainable Growth and Investment Manager
would provide a further detailed map outlining the different types of land
within the orange boundary of map on P63 of the report and this would be
appended to the minute.
Action
The Planning, Sustainable Growth and Investment Manager/Democratic Services 
Agenda No Report Title Submitted by:
5.6 Pre - Application Report regarding the Erection
of High School, Community Facilities, Veterinary
Clinic, Formation of Sports Pitches, Car Parking
and Associated Works at Land East and West of
Seafield Moor Road, Bilston (22/00581/PAC)  
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report was to advise the Committee of the submission of a
Proposal of Application Notice (PAN) and corresponding pre application
consultation for the erection of a High School, Community Facilities, and Veterinary
Clinic, formation of Sports Pitches, car parking and associated works at land to the
East and West of Seafield Moor Road, Bilston. 
The pre application consultation was reported to Committee to enable Councillors
to express a provisional view on the proposed major development. The report
outlines the proposal, identifies the key development plan policies and material
considerations and states a provisional without prejudice planning view regarding
the principle of development. 
The Planning, Sustainable Growth and Investment Manager outlined the main
sections contained within the report and thereafter in responding to a question
raised by the Chair whether the Council would have to find alternative housing land
if this application was to go ahead and he confirmed that it would not be necessary
to find alternative housing land as it was already covered in another development
which exceeded the planned housing build.  
With regards the Science Park he confirmed there was still a quantum of land within
the Science Park to develop and grow so this will not displace any bioscience
projects coming forward.  Also noted was comments regarding dust suppression
and traffic management.
Decision
The Committee noted:
a) The provisional planning position set out in this report; 
b) That any comments made by Members will form part of the minute of the
Committee meeting; 
c) That the expression of a provisional view does not fetter the Committee in its
consideration of any subsequent formal planning application.
Page 10 of 80

Page 11

Action
The Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.7 Application for Planning Permission in Principle
for a Mixed Use Development Comprising Class
2 (Professional Services), Class 8 (Residential
Institutions), Class 9 (Residential), Class 10
(Non- Residential Institutions) and Sui Generis
(Mixed Use of Retirement Flats and Assisted
Living/Extra Care Flats) Uses; Affordable
Housing; and Associated Enabling Works on an
Area of Open Space at the Junction of the A701
and Pentland Road, Straiton. (21/00958/PP) 
Chief Officer Place
Outline of report and summary of discussion
The application was for planning permission in principle for a mixed use
development comprising Class 2 (professional services), Class 8 (residential
institutions), Class 9 (residential), Class 10 (non-residential institutions) and sui
generis (mixed use of retirement flats and assisted living/extra care flats) uses;
affordable housing; and associated enabling works. The application site was an
area of open space at the junction of the A701 and Pentland Road, Loanhead. 
The Planning, Sustainable Growth and Investment Manager outlined the main
sections contained within the report highlighting the proposal set out in section 3,
the background and the consultations detailed within section 4 and 5 of the report
and advised that the recommendation is to refuse planning permission for the
reasons detailed in Section 9 of the report.   
The Planning Sustainable Growth and Investment Manager in responding to a
question regarding infrastructure confirmed that there was no additional
infrastructure planned other than what was already identified in the application.  
In response to several questions regarding the structure and stability of the ground
he provided some background details of the ground condition in that area advising
that any new development would require to carry out extensive survey work and
this would be assessed on a case by case basis.   He further advised that in
principle any new development would require to stabilise the ground in which it
needs to develop for the development to take place safely without causing any
instability out with the site. 
Councillor Parry, seconded by Councillor Imrie moved to refuse the application for
the reasons as set out in the report.
Councillor Smaill sought clarification on the process if the application was refused
and the Planning Sustainable Growth and Investment Manager advised that the
Applicant has 4 options:
• To appeal to the Scottish Minister
Page 11 of 80

Page 12

• To re-submit an amended scheme improving the application
• To put forward a business case for the land to be allocated in next Local
Plan
• To accept the decision
Decision
The Planning Committee refused the application for the reasons as set out in the
report.
Action
The Planning, Sustainable Growth and Investment Manager 
6. Private Reports 
No items for discussion 
7. Date of Next Meeting 
The next meeting will be held on Tuesday 11 October at 1.00pm 
The meeting terminated at 14.12 pm
Page 12 of 80

Page 13

Auchendinny – Midlothian Local Development Plan (2017) Policy
Legend
Application Boundary –
22/00577/PAC
DEV2 – Protecting
Amenity in Built-Up Area
DEV8 – Open Spaces   
(In Settlement Area)
STRAT3 – Strategic
Housing Land
Allocations
STRAT1 – Established
Housing Land Supply
STRAT1 – Established
Economic Land Supply
ECON2 – Midlothian
Science Zone
IMP2 – Education
Facilities: Primary School
Midlothian
Legend
ENV1 – Protection of
the Green Belt
ENV4 – Prime
Agricultural Land
ENV6 – Special
Landscape Areas
ENV8 – Protection of
River Valleys
ENV14 – Regionally and
Locally Important
Nature Conservation
Sites
ENV23 – Scheduled
Monuments
RD1 – Development in
the Countryside
PS
Hs20
h9
b9
Date: 06 Sep 2022
Issue: FOR INFO ONLY
MLC / KL
Map reproduced by permission of Ordnance
Survey (Licence No. 100023416)
MLDP Map produced by Lovell Johns Ltd
N
Page 13 of 80

Page 14

Page 14 of 80

Page 15

Planning Committee
Tuesday 11 October 2022
Item, No: 5.1
UPDATE REPORT ON PLANNING ENFORCEMENT ACTIVITY AND NEW
MIDLOTHIAN PLANNING ENFORCEMENT CHARTER FOR APPROVAL  
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of the Scottish
Planning Enforcement regime, provide statistical details of complaints
received, closed and notices served in the period 2019-2022 and to
seek approval of an updated Planning Enforcement Charter which
identifies priorities and targets for planning enforcement activity. 
2 BACKGROUND
2.1 The Town and Country Planning (Scotland) Act 1997 as amended by
the 2006 and 2019 Acts and associated regulations provide the
legislative basis for the various forms of planning enforcement activity.
Scottish Government guidance on the approach to be taken to
enforcement work is contained in Circular 10/2009 – Planning
Enforcement.  Paragraphs 7-10 of the Circular provides a good overall
summary of the framework that local planning authorities are operating
within in relation to planning enforcement matters.
2.2 Paragraphs 7-10 of Circular 10/2009 – Planning Enforcement are as
follows:
7. Nothing in this guidance should be taken as condoning any breach
of planning law.  Planning authorities have a general discretion to take
enforcement action against any breach of planning control if they
consider such action to be expedient, having regard to the provisions of
the development plan and any other material considerations.  When
they are considering whether any particular formal enforcement action
is an expedient remedy for unauthorised development, planning
authorities should be guided by the following considerations: planning
authorities, under the provisions of the 1997 Act, have primary
responsibility for taking whatever enforcement action may be
necessary in the public interest, in their administrative area.
Decisions in such cases, and any resulting action, should be taken
without undue delay.  Failure to do so could constitute grounds for a
finding of maladministration by the Scottish Public Services
Ombudsman.  In considering any enforcement action, the planning
Page 15 of 80

Page 16

authority, with regard to the development plan, should consider
whether the breach of control would affect unacceptably either public
amenity or the use of land and buildings meriting protection in the
public interest.  Enforcement action should always be commensurate
with the breach of planning control to which it relates.  For example, it
is usually inappropriate to take formal enforcement action against a
trivial or technical breach of planning control which has no material
adverse planning implications (but see paragraph 8 below).  However,
planning authorities should be aware that failure to take enforcement
action against a breach of planning control could be subject to a
referral to the Scottish Public Services Ombudsman 
8. While it is the case that it may be possible to resolve a breach of
planning control through informal negotiations, particularly where the
breach is relatively minor and/or unintentional, where such an
approach is initially unsuccessful, further negotiations should not be
allowed to hamper or delay whatever formal enforcement action may
be required to make the development acceptable on planning grounds,
or to compel it to stop.  Planning authorities should bear in mind the
statutory time limits for taking enforcement action and, in particular, the
possibility that a referral to the Procurator Fiscal to determine whether
to initiate a criminal prosecution may need to be made promptly in
those cases where breaches have to be prosecuted within 6 months of
the date on which the offence was committed.  This is not the date of
the alleged breach of planning control but the last date of failure to
comply with the Notice requiring the breach to be remedied. 
9. The integrity of the development management process depends
upon the planning authority's readiness to take effective enforcement
action when necessary.  Public respect for the development
management system is undermined if unauthorised development,
which is unacceptable on its planning merits, is allowed to proceed
without any apparent attempt by the planning authority to intervene
before serious harm to amenity results from the breach. 
10. Planning authorities have a wide choice of available options for
taking enforcement action, whenever they consider it appropriate.
Authorities need to assess, in each case, which power (or mix of
powers) is best suited to dealing with any particular suspected or actual
breach of control to achieve a satisfactory, lasting and cost-effective
remedy.  Rapid initiation of enforcement action is usually vital to
prevent a breach of planning control becoming well established and
more difficult to remedy. 
2.3 The time limits on taking enforcement action are identified at
paragraphs 10-12 of the Circular: 
10. Where a breach of planning control consists of the carrying out of
any form of 'operational development' without planning permission,
section 124(1) provides that enforcement action may only be taken
Page 16 of 80

Page 17

within 4 years of the date on which the operations were 'substantially
completed'.  This provision extends to building, engineering, mining
and other operations in, on, over or under the land.
11. Where a breach of planning control consists of a change of use of
any building (which, for the purposes of the 1997 Act, includes part of a
building) to 'use as a single dwellinghouse', section 124(2) provides
that enforcement action may only be taken within 4 years of the date of
the breach.  This time limit applies both where the change to use as a
single dwellinghouse involves development without planning
permission, and where it involves a failure to comply with a condition or
limitation to which a planning permission is subject.
12. Where there is any other breach of planning control - i.e. a breach
involving any material change in the use of land (other than a change
to use as a single dwellinghouse) either without planning permission, or
in breach of a condition or limitation to which a planning permission is
subject - section 124(3) provides for the 10 year time limit on
enforcement action to apply.
2.4 It should be noted that there are no time limits for taking enforcement
action in relation to unauthorised works to listed buildings.
2.5 In Midlothian all valid planning enforcement complaints received are
investigated.  Investigations will take different time period depending on
the nature of the issue involved and the complexity of the case. 
Typically an enforcement complaint will we closed for one of the
following five reasons:
• Investigations identify that there is no breach of planning control;
• There is a breach of planning control but it is considered to be a
minor/technical breach and not harmful and therefore not
expedient to take further action;
• The breach has been resolved informally; 
• Retrospective planning permission has been granted for the
previously unauthorised development; or
• Formal enforcement action has been taken and the notice served
has been complied with. 
2.6 The details of the different enforcement powers open to the Council are
set out in the attached Planning Enforcement Charter.
3 MIDLOTHIAN PLANNING ENFORCEMENT CHARTER 
3.1 Section 158A of the Town and Country Planning (Scotland) Act 1997
as amended requires a planning authority to prepare an enforcement
charter.  This is a publicly available document setting out how the
enforcement system works, in particular, the role of the planning
authority and the service standards it sets itself. 
3.2 The proposed updated charter sets out: 
Page 17 of 80

Page 18

• the background to planning enforcement;
• the different types of notice available to local planning authorities; 
• the considerations the local planning authority must have in
contemplating enforcement action including expediency; 
• service standard and priorities; and 
• the new requirement from the Planning (Scotland) Act 2019 for
Scottish local authorities to proactively monitor major
development sites. 
3.3 Once the Enforcement Charter is approved it will be published on the
Council’s website.  Furthermore, the intention is to transfer the attached
word document into a more attractive version with visual
representations in line with the suite of other planning documents on
the Council’s website.   
4 ENFORCEMENT ACTIVITY 
4.1 The below tables sets out the number of enforcement complaints
received and closed and enforcement notices served for the period
2019-2022. 
Table 1- Enforcement Complaints Received and Closed 2019-2022 
2018/19 2019/20 2020/21 2021/22 2022/23* 
Complaints
received
157 135 127 71 23
Cases
closed
133 80 80 172 46 
*Q1 2022/2023 – 1 April -30 June 2022 
Table 2- Notices Served by Midlothian Council 2019-2022 
2019 2020 2021 2022** 
Planning
Contravention Notice
6 0 9 9
Enforcement Notice  2 3 1 8
Breach of Condition
Notice
3 0 1 0
Section 179 (Amenity
Notice)
0 0 0 1
Section 33A –
Submission of a
Planning Application
0 0 1 9 
**to date
Page 18 of 80

Page 19

5 RECOMMENDATION 
5.1 It is recommended that the Committee: 
a)  Note the report on Planning Enforcement Matters;
b) Approve the attached Midlothian Planning Enforcement Charter
2022 and agree to its publication; and
c) Delegate to the Planning, Sustainable Growth and Investment
Manager any formatting matters to enable the Planning
Enforcement Charter to be uploaded onto the Council’s website
in a more attractive format with visual representations in line
with the suite of other planning documents on the Council’s
website. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:   30 September 2022
Contact Person:  Matthew Atkins Lead Officer Planning Obligations and
Enforcement   
matthew.atkins@midlothian.gov.uk
Page 19 of 80

Page 20

1 
Midlothian Council 
Planning Enforcement Charter 2022 
To ensure an effective, consistent and clear approach to carrying out
enforcement with regards to breaches in planning control 
The Scottish Government’s Circular 10/2009 Planning Enforcement recognises that:
“The integrity of the development management process depends upon the planning
authority's readiness to take effective enforcement action when necessary.  Public
respect for the development management system is undermined if unauthorised
development, which is unacceptable on its planning merits, is allowed to proceed
without any apparent attempt by the planning authority to intervene before serious
harm to amenity results from the breach.” 
Contents 
1. Introduction to Planning Enforcement      2
2. Planning Enforcement: The Basic Principles    3
3. Time Limits for Taking Enforcement Action      4
4. Making an Enforcement Complaint       4
5. Priorities for Planning Enforcement       5
6. Midlothian Planning Enforcement – Objectives and Process   6
7. What you can expect when making an enforcement complaint  6
8. Enforcement Controls        8
9. Direct Action Policy         11
10. Planning Obligations        13
11. Compliance           13 
Page 20 of 80

Page 21

2 
1 Introduction to Planning Enforcement 
The vision defined within the Local Outcomes Improvement Plan (LOIP) for
Midlothian is: 
“By 2030 Midlothian will be a carbon neutral area with a sustainable green
economy, built and natural environment; where working in partnership with
residents, community organisations, public service agencies and businesses
we will have reduced inequalities in learning, health and economic
circumstances over life; both between Midlothian residents locally, and
between Midlothian residents and Scottish averages.” 
Planning Enforcement plays an important role in achieving these goals and
improving the quality of life and civic pride amongst our communities.  The
Midlothian Planning Enforcement Charter is focused on ensuring that Midlothian
continues to be a place of choice to live and work because of the good quality of life
it provides.  It will ensure that Midlothian maintains a high quality built environment
and fosters civic pride amongst residents who are proud to call Midlothian their
home. 
The Council is responsible for dealing with issues of Planning Enforcement across
Midlothian.  This is important to ensure that all development accords with both
national and local planning policies while at the same time achieving the Council’s
spatial vision for Midlothian.  
Development without planning consent can cause upset and distress for residents,
businesses and visitors to Midlothian.  Most breaches of planning control are not a
criminal offence although there are some notable exceptions, such as unauthorised
works to listed buildings, unauthorised works to protected trees and demolition in
conservation areas without consent. 
All complaints regarding a potential breach of planning regulations are subject to an
initial investigation and the Council has discretion over what action will be taken and
when.  This will be based on the particular merits of each individual case and
enforcement action will be taken where and when it is considered fair, reasonable,
proportionate and expedient to do so.  
The Planning Enforcement Charter sets out how the Council will deal with breaches
of the planning regulations.  It provides information and guidance to residents,
developers and those with other interests, regarding how the Council will deal with
developments which do not accord with national and local policies.  It seeks to
balance the concerns of local people with the rights of land and property owners, and
sets out the nature and timescales associated with taking timely enforcement action
where appropriate. 
The enforcement process followed by the Council is in accordance with the national
approach set out in the Scottish Government’s Circular 10/2009 Planning
Enforcement https://www.gov.scot/publications/planning-circular-10-2009-planning-
enforcement/ 
Page 21 of 80

Page 22

3 
2 Planning Enforcement – The Basic Principles 
The Definitions - The Planning Enforcement system can only take action against
development that does not have planning permission and is a breach of planning
control: 
So what is Development? 
The meaning of “development “is defined with the Town and Country Planning
(Scotland) Act 1997 (“the 1997 Act”) Section 26(1) as: 
…“development” means the carrying out of building, engineering, mining or other
operations in, on, over or under land or the making of any material change in the use
of any buildings or other land”
What is a breach in planning control? 
A breach of planning control is defined under Section 123(1) of the 1997 Act: 
a) Carrying out development without the required planning permission, or
b) Failing to comply with any condition or limitation subject to which planning
permission has been granted,
c) Initiating development without giving notice in accordance with Section 27A(1)
of this Act, or
d) Carrying out development without displaying a notice in accordance with
Section 27C(1) of this Act.
Considering these definitions what can the Council investigate and not investigate
under its Planning Enforcement function: 
The Council’s Planning Enforcement Service can investigate the following:
∼ Development consisting of the change of use of land/buildings without
planning consent; 
∼ Works to listed buildings without consent;
∼ Any activity giving rise to direct or indirect damage to protected trees or
qualifying trees in conservation areas;
∼ Non-compliance with conditions attached to a grant of planning permissions;
∼ Unauthorised building works and/or engineering works; and 
∼ The display of unlawful advertisements. 
The Council’s Planning Enforcement Service cannot investigate:
∼ Boundary disputes and other land ownership issues (including servitudes,
wayleaves and title conditions) which are  civil matters outwith the remit of
planning legislation; 
∼ Devaluation of property, including that caused by damage from the
development process; 
∼ Obstructions, parking and traffic enforcement;
Page 22 of 80

Page 23

4 
∼ Graffiti and anti-social behaviour;
∼ Dangerous structures; and
∼ Noise nuisance 
Before taking enforcement action consideration will be been given to the
Human Rights Act 1998 and to the Equalities Act 2010. 
3 Time Limits for Taking Enforcement Action 
The Council may take enforcement action against unacceptable unauthorised
operational development (building and engineering works) for up to four years from
the date the breach commences.  Operational development includes, for example: 
∼ Alterations and/or extensions to residential properties; 
∼ Alterations and/or extensions to commercial properties;
∼ Alterations to shop fronts;
∼ The erection of boundary fencing;
∼ Engineering operations comprising the changing the level of land or the
formation of a hardstanding;
∼ The erection of a new building. 
For any other development involving a change of use of land and/or building/s or a
breach of a planning condition the Council may take action up to ten years from the
commencement of the breach. 
There is an exception to this ’10 year rule’ - for any development involving a change
of use to a residential use (Class 9 or Sui Generis flat) the Council has four years to
take enforcement action. 
For listed buildings there is no time limit to taking action as long as the breach of
planning control happened after the building was listed. 
4 Making an Enforcement Complaint 
In order to investigate a potential breach of planning control the Council will require:
the address of the specific property/s or premise/s at which the alleged breach is
taking place; 
∼ Details of the alleged breach of planning control; including details of the
location, scale and timings of the alleged breach;  
∼ The complainant’s name, address and email/telephone contact details; 
∼ The Council will not accept any enquiries submitted anonymously or
complaints that the Council consider to be vexatious. 
Confidentiality - Any details submitted to the Council in relation to an enforcement
complaint will be treated in the strictest confidence.  The Council will not reveal the
identity of the complainant to those parties responsible for the alleged breach of
planning control.  
Page 23 of 80

Page 24

5 
Enforcement complaints can be made in the following ways: 
Online via Planning and building | Midlothian Council 
By email via planning.enforcement@midlothian.gov.uk 
By Post 
Planning Enforcement
Fairfield House 
8 Lothian Road
Dalkeith
Midlothian
EH22 3AA 
5 Priorities for Planning Enforcement 
All enforcement complaints are important to us, however to manage the limited
resource effectively we must prioritise complaints so that the breaches which have
the potential to cause the most harm are dealt with quickly and efficiently.  A breach
of planning regulations will be assessed according to the following categories: 
1. Significant Harm includes:
∼ Development with serious and immediate implications upon the continued
health and wellbeing of the public;
∼ Loss of a protected tree/s;
∼ Loss or damage to a listed building;
∼ Breaches of Planning Obligations - non-payment of financial contribution. 
2. Medium Harm includes:
∼ Unauthorised development which would adversely affect the character and
appearance of a conservation area or the setting of a listed building;
∼ Unauthorised building and/or engineering works;
∼ Unauthorised changes of use; 
∼ Breaches of planning conditions which result in harm to general amenity; and
∼ Breaches of planning conditions in relation to major developments. 
3. Low Harm includes: 
∼ Unauthorised signage and advertisements (unless the sign/advert seriously
affects public safety); 
∼ Any breach of planning control which is of a temporary nature (unless public
safety is compromised);
∼ Unauthorised fences, walls and gates outside of a Conservation Area (unless
as identified as being harmful to highway/pedestrian safety in which case it
will be considered as Medium Harm);
∼ Development that, based on the information provided and/or an initial
consideration, is unlikely to be a breach of planning control;
Page 24 of 80

Page 25

6 
∼ Unauthorised telecommunications equipment or satellite dishes on residential
dwellings; and
∼ Untidy land 
6 Midlothian Planning Enforcement – Objectives and Process 
The Council aims to treat all service users in a fair manner and will deal with all
cases where a breach is discovered in a transparent way. 
Where a breach has occurred we will: 
∼ Communicate clearly to the responsible person/s by explaining what steps are
required to resolve the breach and the possible consequences in the event
that those steps are not taken; 
∼ Update the complainant about what actions are being taken - this means we
will inform them at each key stage of the process, for example, during the
progress of the investigation, whether an enforcement notice has been served
or if an appeal against a notice has been received;
∼ Show identification when we visit a site; 
∼ Take formal enforcement action where required in the event that attempts to
negotiate a remedy appear to fail; 
∼ Explain the right of appeal against any notices issued; 
∼ Let the complainant know the final outcome of their complaint.  
Although personal circumstances may be considered in some instances and each
enforcement complaint received will be considered on a case by case basis, the
Council will generally deal with enforcement complaints in line with process set out in
Section 7 of this Charter. 
7 What you can expect when making an enforcement complaint 
When your complaint is received by the Council it will be subject to initial screening
and categorised as Significant Harm, Medium Harm or Low Harm.  You will receive
an acknowledgment detailing how your case has been prioritised and details of the
case officer who will be dealing with your complaint. 
The site will be visited within: 
∼ 5 working days* for cases of Significant Harm
∼ 10 working days for cases of Medium Harm
∼ 20 working days for cases of Low Harm 
*A breach causing immediate irreversible unacceptable harm will be visited within 48
hours. 
Following this site visit an initial assessment will be carried out and if no breach is
discovered the case will be closed.  It is acknowledged that in some instances it may
be that the level of harm won’t be apparent until a site visit has been carried out and
in some cases the priority level of the case adjusted.
Page 25 of 80

Page 26

7 
If a breach of planning control has occurred the owner and/or relevant parties will be
advised by the Council of the action that they need to take to remedy the breach.
This could include: 
∼ The cessation of the use of land and/or buildings or the removal of any
unauthorised building/engineering works; or 
∼ Submit a retrospective planning application in an attempt to regularise the
breach of planning control.  The submission of a planning application does not
automatically mean planning permission will be forth coming. 
The owner and/or relevant party will be given up to 28 days to comply with these
requirements.   
After the expiry of the 28 day period a second assessment will take place by the
Planning, Sustainable Growth and Investment Service to determine if it is expedient
to take further action.  This will take into account the nature of the breach of planning
control, the harm caused by the development and the intentions and actions of the
owner and/or relevant parties to this point. 
“Expedient” 
Where it is considered expedient to pursue the case one of the following options is
likely to be required:
∼ Further negotiation/investigation is required to making a determination if
formal action is required; 
∼ Further evidence needs to be secured - this can be achieved through the
service of a formal Planning Contravention Notice (PCN) on land
owners/occupiers; or 
∼ The service of a formal notice requiring action to be taken by a set deadline. 
A full list of notices and explanations is included in Section 8 of this Charter. 
“Not expedient” 
It is at the Council’s discretion whether to take formal enforcement action.  Planning
breaches may be unintentional or be considered technical or trivial.  The Council will
take action when it is considered fair and reasonable to do so and is proportionate to
any harm caused.  In some cases where there is a breach of planning control the
harm caused is minor, meaning action is not justified, for example it is not expedient
to pursue the case. 
Each case will be determined on its own individual merits. 
Expediency 
There are no statutory definition of expediency although it has been considered in
the Courts and relevant case law identifies that local authorities when determining
whether it is expedient to take action should consider the following:
∼ Is the proposed action in the public interest (not private interest);
∼ The breach is sufficiently harmful to justify taking action;
∼ The proposed action is reasonable and commensurate with the breach in
planning control to which it relates;
∼ The action undertaken would be cost effective; and
∼ Or not take action if the development is in accordance with planning policies.
Page 26 of 80

Page 27

8 
Timescales 
It is important to remember that Planning Enforcement action can be a lengthy
process and potentially frustrating process for all involved. The Enforcement Team
aims to resolve breaches as quickly as possible. 
∼ We aim to close 60% of our cases within 16 weeks of receipt of a complaint; 
However, due to the nature of enforcement and the effects of external factors such
as the timescales involved in appeals to the Scottish Ministers and prosecutions,
some cases will take longer. We appreciate your patience. 
8 Enforcement Controls – Notices and Other Powers 
Breach of Condition Notice (Section 145 of the 1997 Act as amended)
Used for enforcing the conditions applied to any planning permission.  It is effective
from the date it is served.  It may be used as an alternative to an enforcement notice
(see below), and is served on any person carrying out the development and/or any
person having control of the land.  There is no right of appeal against this notice.
Contravening a breach of condition notice can result in the Council deciding to
prosecute, with a fine of up to £5,000 per offence. 
Enforcement Notice (Section 127 of the 1997 Act as amended)
This notice is generally used to deal with unauthorised development but can also be
used for a breach of planning conditions.  There are similar notices and powers to
deal with listed buildings and advertisements, (see below).  An Enforcement Notice
will specify a time period to take effect (usually a minimum of 28 days) and will
specify what steps that must be taken to remedy the breach and the time for this to
be completed after the take effect period.  There is a right of appeal against an
Enforcement Notice, and the terms of the notice are suspended until a decision is
reached.  Failure to comply with the terms of an Enforcement Notice within the time
specified is an offence and may lead to the imposition of a fine of up to £50,000 per
offence. 
Fixed Penalty Notice (Section 136A and 145A of the 1997 Act as amended)
Where there is non-compliance with an Enforcement Notice or Breach of Condition
Notice, the Council can serve a fixed penalty notice.  The fine has been set at £2,000
for non-compliance with an Enforcement Notice, and £300 for non-compliance with a
Breach of Condition Notice.  There is no right of appeal against these notices,
although timeous payment prevents the Council from reporting the non-compliance
with the original notice to the Procurator Fiscal.  It should be noted however that this
type of notice cannot be served where a person has already been prosecuted for
non-compliance with the same Enforcement or Breach of Condition Notice. 
Listed Building Enforcement Notice (Section 34 Planning (Listed Buildings and
Conservation Areas) Act (Scotland) 1997)
This must be served on the current owner, occupier and anyone else with an interest
in the property, and the procedures involved are similar to those outlined above in
relation to Enforcement Notices.  The notice must specify the steps to be taken to
remedy the breach and specify a final date for compliance.  Failure to meet the terms
of the notice by the date specified is an offence.  There is the right of appeal against
the notice.  Breaches of listed building control are a serious matter.  It is a criminal
Page 27 of 80

Page 28

9 
offence to undertake unauthorised works to demolish, significantly alter, or extend a
listed building, and this could, in certain circumstances, lead to a fine up to £50,000
or imprisonment. 
Stop Notice (Section 140 of the 1997 Act as amended)
This is only used in particularly urgent or serious cases where unauthorised activity
must be stopped, usually on grounds of public safety or a significant impact on public
amenity.  A Stop Notice is served with an Enforcement Notice.  A Stop Notice cannot
prohibit the use of a building as a dwellinghouse or prohibit the carrying out of any
activity if the activity has been carried out for a period of more than four years.  If a
Stop Notice is served without due cause, or a subsequent appeal against a parallel
Enforcement Notice is upheld, the Council may be open to claims for compensation.
The use of Stop Notices therefore needs to be carefully assessed by the Council.
There is no right of appeal against a Stop Notice, and failure to comply with its terms
is an offence and may lead to the imposition of a fine of up to £50,000 per offence. 
Temporary Stop Notice (Section 144A of the 1997 Act)
In certain cases where a breach of planning control is considered to have a severe
impact on amenity, a Temporary Stop Notice can be served.  These do not require to
be accompanied by an Enforcement Notice and last for a maximum of 28 days.
There is no right of appeal against a Temporary Stop Notice, and failure to comply
with its terms is an offence and may lead to the imposition of a fine of up to £50,000
per offence. 
Notice requiring application for planning permission for development already carried
out (Section 33A of the 1997 Act as amended) – A Section 33A Notice.
Where the Council considers that a development which does not have planning
permission may be acceptable (i.e. they consider that it might be granted planning
permission) they may issue a notice requiring the landowner or developer to submit
a retrospective planning application.  This application will be considered on its
planning merits and handled in the same way as any other planning application.
Issuing such a notice does not guarantee that permission will be granted; the
Council may, on consideration of the application, decide instead to refuse
permission, or to grant permission subject to conditions or alterations to make the
development acceptable.  In the event of non-submission - the Council has to assess
whether it is expedient to take further enforcement action. 
Planning Contravention Notice (Section 125 of the 1997 Act as amended)
Used to obtain information about activities on land where a breach of planning
control is suspected.  It is served on the owner or occupier, on a person with any
other interest in the land or who is carrying out operations on the land.  They are
required to provide information about operations being carried out on the land and
any conditions or limitations which apply to any planning permission already granted.
Supplementary information or representations on the matters raised in the notice
may also be requested.  There is no right of appeal against a Planning Contravention
Notice, and failure to comply with its terms is an offence and may lead to the
imposition of a fine of up to £5,000 per offence or £10,000 for knowing providing
false or misleading information.
Page 28 of 80

Page 29

10 
Requisition of Information Notice (Section 272 of the 1997 Act as amended) 
Provides limited powers to obtain information on interests in land and the use of
land. There is no right of appeal against a Requisition of Information Notice, and
failure to comply with its terms is an offence and may lead to the imposition of a fine
of up to £1,000 per offence. 
Amenity Notice (Section 179 of the 1997 Act) 
Allows the Council to serve a notice on the owner, lessee or occupier of land which
is adversely affecting the amenity of the area.  The notice, which is also known as an
‘Amenity Notice’, and sets out the action that needs to be taken to resolve the
problem within a specified period.  There is a right of appeal and the terms of the
notice are suspended until a decision is reached.  If the notice is not complied with
the Council can decide to undertake the required works (direct action) and then
recover the costs. 
Advertisement powers
The Council’s powers are set out in the Town and Country Planning (Control of
Advertisements) (Scotland) Regulations 1984.  The Council have powers to serve
Advertisement Enforcement Notices in relation to advertisements that are
unauthorised in terms of the above regulations.  A notice of this type can specify a
time period (normally 28 days) for compliance with its terms.  However, this period
can be reduced to seven days if the Council believes there is an urgent need for the
advertisement to be removed or altered in the interests of public safety.  Displaying
an advertisement in contravention of the regulations is an offence and, if convicted in
court, an offender can be fined up to £5,000 per offence and £50 per day for
continued display after confiction.  The Council also has powers to remove or
destroy placards and posters that do not have planning permission or deemed
consent.  If the person who put up the poster can be identified, they have to be given
at least two days' notice that the Council intends to take the poster down.  If they
cannot be readily identified, then the advert can be removed immediately.  Council
officials can enter unoccupied land, if necessary, to remove an advertisement. 
However, they have no powers to remove advertisements displayed within a building
to which there is no public access.  The content of an advertisement is not covered
by planning control.  Any complaints about advertisement content should be made to
the Advertisement Standards Authority. 
Interdict, Interim Interdict and Injunction
This is a court order used to stop or prevent a breach of planning control.  Such
applications are considered by the courts on their own merits.  Before initiating
proceedings, the Council will consider the likely outcome and the risk of incurring
wasted expenditure. 
Direct action
Failure to comply with the terms of an Enforcement Notice within the time specified
can result in the Council carrying out the specified work.  The Council may then
recover its costs from the landowner. 
Page 29 of 80

Page 30

11 
Power to Enter Land
The Council has powers to enter land to investigate alleged breaches of planning
control, to check whether there has been compliance with a formal notice, or to
check whether a breach has been satisfactorily resolved.  This power applies to any
land and may involve officials entering land owned by neighbours adjacent to the site
of the breach or alleged breach. 
Unauthorised Works to Protected Trees (Section 171 of the 1997 Act as amended) 
S171 of the 1997 Act defines that it is an offence to carry out works to trees subject
to statutory protection, which results in their uprooting, felling, lopping or wilful
destruction, without the Council’s prior consent.  In addition to planning controls a
Felling Permission from Scottish Forestry may be required to feel trees.  Guidance
can be found: https://forestry.gov.scot/support-regulations/felling-permissions 
Formal action can be taken against persons who have carried out unauthorised
works to trees that are subject to statutory protection by virtue of either a Tree
Preservation Order (TPO) or a tree(s) being within a Conservation Area.  Where
protected trees have been removed or destroyed formal action can be taken through
the service of a Tree Replacement Notice to secure replacement planting.  In some
cases, reports of offences may be submitted to the Procurator Fiscal and, if
successful, can result in fines up to £20,000. 
High Hedges
The High Hedges (Scotland) Act 2013 came into effect on 1 April 2014. It grants
local authorities the power to act as independent adjudicators in disputes between
neighbours with regard high hedges.  Before that date there was no Scottish local
government mechanism to resolve disputes between neighbours regarding
overgrown hedges.  The legislation was designed to provide a solution to the
problem of high hedges if they interfere with people's right to 'reasonable enjoyment'
of their property.  In order for an application for a High Hedge Notice (HHN) to be
considered, the applicant is required to produce formal evidence that attempts have
been made to settle the issue with their neighbour beforehand.  Following a full
assessment of a HHN application, the Council can either decide to issue a HHN or
dismiss the application.  If a HHN is issued, it ordinarily requires the owner of the HH
to take steps to reduce its height and to maintain the hedge thereafter at a reduced
height.  Non-compliance is enforced by direct action and recover of costs where
possible. 
9 Direct Action Policy 
In order to ensure the Council is able to resolve breaches of planning consent in a
timely manner it has the power to instigate direct action where works have not been
undertaken in compliance with an enforcement notice – the Council can then seek to
recover the cost the remediation works. 
Background 
If the requirements of an enforcement notice are not met within the period of
compliance specified in the notice, Section 135 of The 1997 Act as amended grants
the Council additional powers to:
Page 30 of 80

Page 31

12 
∼ Enter the land and take the steps to satisfy the requirements of a notice; and
∼ Recover from the person who is then the owner of the land any expenses
reasonably incurred by them in doing so. 
In light of the social, physical and financial issues surrounding the use of Direct
Action, this Policy serves to provide details of the procedure/considerations for
undertaking such action and the process by which the Council will seek to recover
the costs of this action. 
When will direct action be taken?
Direct action may be taken either in isolation of, or in conjunction with court
remedies, including an interdict.  The Council may choose to take action as follows: 
∼ Where the requirements of an enforcement notice have not been complied
with by the compliance date; and
∼ Where the Council considers that direct action is necessary to remedy the
harm caused by a planning breach. 
Direct action procedure 
Once the date to comply with the requirements of an enforcement notice expires,
Council officers will visit the site to check compliance.  If following this site visit it is
confirmed that the notice has not been complied with in full, the Council will assess
whether it is expedient to take additional action, including prosecution, an injunction
and/or direct action.  
The Council will write to the owner/responsible parties to advise of the intention to
take direct action, at least 28 days before works are due to take place.  
In order to access the property, the Council may need to liaise with other services
including the Police and/or Bailiffs. 
In taking direct action the Council may appoint an officer to project manage the
works on-site to ensure that the steps of the notice are complied with.  
It should be noted that any materials, debris or other items that are removed from a
premises throughout the course of undertaking direct action will be stored securely
for a minimum of three days.  
The Council will take steps to advise the owner(s) of these items and how to recover
such possessions.  After this time the Council may choose to dispose of this material
or sell them to recover the expenses of taking direct action.  
Process for recovery of costs
In accordance with the provisions of Section 135 of The 1997 Act as amended, the
Council will undertake all reasonable endeavours to recover expenses incurred in
undertaking direct action.  A charge will be applied to the land and an invoice sent to
owners/responsible parties; this charge is binding on successive owners of the land
to which the original Enforcement Notices relates.  This charge will take effect on the
date that the Council undertakes direct action to comply with the Enforcement
Notice.  
Page 31 of 80

Page 32

13 
The expenses recoverable will include such sums as the Council considers being
reasonable in respect of its establishment charges.  An establishment charge is the
reasonable charge that a Local Authority incurs for administering the direct action
procedure. 
The Council will take all reasonable steps to recover the expenses as a debt and will
raise an invoice in accordance with its existing practice and procedures and if the
debt remains unpaid, the Council will take steps to register the charge for payment at
the Land Register to be noted against the title of the property. 
10  Planning Obligations 
The Council proactively monitors compliance with planning agreements entered into
pursuant to Section 75 of the 1997 Act as amended to ensure that financial
contributions are paid in a timely manner and in accordance with the provisions of
the agreement.  If the Council identifies ongoing development taking place without
the necessary contributions being paid or required infrastructure being provided, the
Council reserves the right to seek arrestment of the developer’s bank account(s)
and/or interdict the development pursuant to Section 146 of The 1997 Act to ensure
adherence to the terms of the planning agreement.  As a standard requirement the
Council requires that provision is made in planning agreements for late interest on
unpaid sums to attract an interest rate of 8% above the Bank of England base rate. 
11 Compliance 
The Planning Acts require that Councils set out in their Enforcement Charters how
they will monitor compliance with the planning permissions for major developments.
The Council already proactively monitors commencement of major developments
(and other developments that are subject to a Planning Obligation).  From 1 April
2023 the Council will aim to visit each major development that is in the course of
being implemented/constructed and undertake a check in relation to the approved
plans and relevant conditions every two months.  Relevant details will be recorded in
a spreadsheet that will be updated and made available for public viewing online. 
Any specific issues brought to the Council’s attention may lead to additional
monitoring activity. 
Page 32 of 80

Page 33

Planning Committee
Tuesday 11 October 2022
Item No: 5.2
UPDATE REGARDING THE USE OF PLANNING CONDITIONS TO COVER
THE DURATION OF PLANNING PERMISSIONS.  
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of new
regulations which implement sections of the Town and Country
Planning (Scotland) Act 2019 in relation to the requirement to use
planning conditions to limit the duration of planning permissions (based
on commencement of development, not completion of development). 
1.2 This report will also provide advice to the Committee in relation to the
determination of planning applications in respect to timescales limiting
the duration of planning permissions and will recommend a procedure
in relation to applications for planning permission which have already
been considered by the Committee but have not yet been issued (as
they are subject to the legal processes associated with securing
developer contributions).
2 BACKGROUND
2.1 The Town and Country Planning (Scotland) Act 1997 set out a
requirement for development secured through the grant of planning
permission (both in detail and principle) to be commenced within a
prescribed timescale.  This time scale was to be secured through the
use of planning conditions.
2.2 The Town and Country Planning (Scotland) Act 2006 subsequently
removed the requirement to use planning conditions to specify the
duration of the planning permission.  The legislation set out a direction
in respect to the time periods within which development was to
commence before the permission would lapse and, as such, planning
conditions were not necessary.
2.3 The 2006 Act made the situation less clear for applicants/developers
and members of the public, who were not always aware of the date by
which a development was meant to commence given that it was not
specified within the conditions attached to the decision notice.
Page 33 of 80

Page 34

2.4 The Town and Country Planning (Scotland) Act 2019 sets out a
requirement for conditions to again be used in order to cover the
duration of a planning permission.  The legislation states that
applications for (detailed) planning permission have three years within
which development must be commenced and five years for
applications for planning permission in principle.  Should a condition
not be attached to a planning decision the legislation requires the
development to comply with those timescales. 
2.5 Aside from the change to the requirement to now use planning
conditions to limit the duration of planning permissions one other
change is to the actual time within which development approved
through an application for planning permission in principle is to be
commenced.  The 2019 Act simplifies the position in that, irrespective
of the submission of any applications in relation to discharging matters
specified in conditions, development must start on the scheme
approved through the planning application in principle within five years
of the original decision notice. 
2.6 The Council can agree to alternative durations for the planning
permission through the use of the planning conditions.  In order for
alternative timescales for the commencement of development to be
considered justification needs to be submitted by the applicant for
assessment.  There may be specific circumstances that justify shorter
or longer periods before a planning permission lapses. 
2.7 In addition, the 2019 Act allows planning authorities to attach
conditions with regard to the timing of making applications for approval
of detailed matters, and as to the phasing of development. 
2.8 The clarity provided in relation to the duration of a planning permission
in relation to a planning permission in principle may be welcomed by
local communities.  However, it is the case that applicants can apply to
modify or remove a planning condition through section 42 of the Act.
Despite this, there may be material considerations which could result in
a section 42 application not being approved. 
2.9 The abovementioned changes came in to effect on 1 October 2022. 
3 PROCEDURE 
3.1 Standard planning conditions covering the duration of planning
permission have been revised and reintroduced.  Unless an alternative
time period has been assessed as being appropriate all planning
applications which are approved are subject to the conditions below: 
Application for planning permission 
Condition: The development to which this permission relates shall
commence not later than the expiration of three years beginning with
the date of this permission. 
Page 34 of 80

Page 35

Reason: To accord with the provisions of Section 58 of the Town and
Country Planning (Scotland) Act 1997 (as amended by the Planning
(Scotland) Act 2019). 
Application for planning permission in principle 
Condition: The development to which this permission relates shall
commence not later than the expiration of five years beginning with the
date of this permission. 
Reason: To accord with the provisions of Section 59(2) of the Town
and Country Planning (Scotland) Act 1997 (as amended by the
Planning (Scotland) Act 2019). 
3.2 When considering future development proposals at the Committee,
members may wish to consider whether it is the Council’s view that
development should commence within a particular timescale.  However
it would be necessary to carefully justify any change from the position
set out in the legislation. 
3.3 There are a small number of planning applications which have been
considered by the Committee which are still to have a decision issued.
This could be due to various reasons, but it is usually as a result of
ongoing discussions regarding developer contributions.  When these
applications were originally considered by the Committee it was not a
requirement to attach planning conditions in relation to limiting the
duration of the planning permission.  For any planning decisions issued
after the 1 October 2022 it will be necessary to attach the conditions
which appear in paragraph 3.1 above. 
4 RECOMMENDATION 
4.1 It is recommended that the Committee: 
a) notes that planning conditions relating to the duration of planning
permission will be attached to planning decisions from the 1
October 2022; and,
b) agrees that planning applications which have been considered by
the Committee at previous meetings and are to be approved, but
the decision notice not yet issued, are to be subject to the planning
conditions stated in paragraph 3.1 of this report. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:    30 September 2022
Contact Person: Duncan Robertson, Lead Officer Local Developments 
duncan.robertson@midlothian.gov.uk
Page 35 of 80

Page 36

Page 36 of 80

Page 37

Planning Committee
Tuesday 11 October 2022
Item No: 5.3
APPEAL DECISION WITH REGARD APPLICATION FOR PLANNING
PERMISSION IN PRINCIPLE 21/00252/PPP, FOR RESIDENTIAL
DEVELOPMENT, FORMATION OF ACCESS ROADS AND CAR PARKING,
A SUSTAINABLE URBAN DRAINAGE SYSTEM AND ASSOCIATED
WORKS AT LAND AT STOBS FARM, LADY BRAE, GOREBRIDGE. 
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of an appeal
decision with regard an application (21/00252/PPP) for planning
permission in principle for residential development, formation of access
roads and car parking, a sustainable urban drainage system (SUDS)
and associated works on land at Stobs Farm, Lady Brae, Gorebridge.
2 BACKGROUND
2.1 The stated planning application was subject to an appeal for non-
determination as it had not been determined by the local planning
authority within the statutory period of time as set out in the application
report presented to the Committee at its meeting of 15 March 2022.
2.2 At its meeting of 15 March 2022 the Committee determined to invite the
Scottish Government Reporter appointed to determine the appeal to
refuse planning permission – the Reporter dismissed the appeal and
refused planning permission.  A copy of the appeal decision is attached
to this report.
2.3 The planning application was subject to 56 objections and an objection
from the Gorebridge and District Community Council.
3 THE DECISION
3.1 In reaching a decision to refuse planning permission because of the
developments potential impact on the landscape and visual amenity
the Reporter concluded “I find the proposal would represent an
undesirable and excessive incursion of development in a highly
prominent part of the landscape, giving rise to significant adverse
landscape and visual effects to the detriment both of the character of
Gorebridge and its setting, and by virtue of the development’s influence
upon wider areas of countryside. On this basis, the development would
Page 37 of 80

Page 38

fail to accord with criterion (a) of SESplan policy 7, and it would also be
contrary to LDP policy ENV 7 (‘Landscape character’)”. 
3.2 However, in reaching the decision, which aligned with the Committee’s
aspirations, the Reporter did reach two other significant conclusions,
one with regard effective housing land supply and the second with
regard meeting demands on education capacity. 
3.3 The first significant conclusion relates to the Council’s housing land
supply position.  The Reporter concluded that because the Council
does not have any housing targets beyond 2024 (because Scottish
Government Ministers rejected SESplan2 on transportation grounds,
not housing targets, SESplan1 is considered out of date and Scottish
Ministers have delayed adopting National Planning Framework 4
(NPF4), which will set Midlothian’s new housing targets) it is
automatically assumed Midlothian has an effective housing land supply
shortfall.  This is despite the Reporter acknowledging there is no
Scottish Government methodology to work out an effective housing
land supply, the lead Reporter in assessing Midlothian’s Local
Development Plan at examination in 2017 concluding the Council had
an effective housing land supply and subsequent Housing Land Audits
(agreed by Homes for Scotland – the umbrella group for the house
building industry) confirmed Midlothian had an effective housing land
supply and that the proposed development will not automatically
contribute to the pre 2024 targets. 
3.4 Although the Reporter’s conclusion on the Council’s effective housing
land supply position can be considered to be unreasonable and in the
immediate future it leaves the Council vulnerable to other housing
appeals (at present no other appeals are pending), it is only a
temporary situation until NPF4 is adopted, and although the deadline
has slipped on a number of occasions the Scottish Government’s latest
commitment is to adopt NPF4 in autumn 2022.  NPF4 will set new
housing targets for Midlothian, the draft NPF4 was setting an annual
supply target of 805 units a year.       
3.5 With regard the second significant conclusion which related to
education capacity, the Reporter stated “I do not consider it to be
satisfactory for the Council to indicate that there is an education
capacity problem but fail to present solutions to it (whether temporary
or permanent)”.  In effect, if a developer is proposing to fund an
education solution to a restriction on education capacity, the Council
should identify a solution rather than refuse a planning application on
education capacity grounds. 
Page 38 of 80

Page 39

4 RECOMMENDATION 
4.1 It is recommended that the Committee notes the planning appeal
decision with regard residential development and associated works at
land at Stobs Farm, Lady Brae, Gorebridge. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:    30 September 2022
Contact Person: Peter Arnsdorf, Planning, Sustainable Growth and
Investment Manager 
peter.arnsdorf@midlothian.gov.uk
Page 39 of 80

Page 40

Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
E: dpea@gov.scot                                     T: 0300 244 6668
Appeal Decision Notice
 
Decision 
I dismiss the appeal and refuse planning permission in principle. 
Preliminary matter 
The council provided a screening opinion which concluded that an Environmental Impact
Assessment (EIA) would not be required to accompany this planning application.  Having
regard to the criteria outlined in Schedule 3 of the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017, which relate to the
characteristics of the development, its location and likely impacts, I agree with the council’s
conclusion that this proposal would not constitute EIA development. 
Reasoning 
1. I am required to determine this appeal in accordance with the development plan,
unless material considerations indicate otherwise.  The adopted development plan is
principally comprised of the Edinburgh and South East Scotland Strategic Development
Plan (the SDP, known as SESplan) adopted in June 2013; and the Midlothian Local
Development Plan, adopted in November 2017 (the LDP).  There is also associated
supplementary guidance which accompanies the SDP and LDP. 
2. Having regard to the provisions of the development plan the main issues in this
appeal are (i) the principle of development, having regard to whether there is a sufficient
effective housing land supply; (ii) landscape and visual effects; and (iii) how infrastructure
requirements would be met. 
Principle of development 
3. The sufficiency or otherwise of the effective housing land supply is a potentially
determinative matter in this appeal, because the location of the development would in
normal circumstances be contrary to the development plan.  It is outwith the settlement 
Decision by Christopher Warren, a Reporter appointed by the Scottish Ministers 
 Planning appeal reference: PPA-290-2061
 Site address: Land at Stobs Farm, Lady Brae, Gorebridge, EH23 4HN
 Appeal by Hallam Land Management and CEG against the failure to give a decision by
Midlothian Council
 Application for planning permission in principle 21/00252/PPP dated 01 April 2020 
 The development proposed: residential development (indicative total of around 308
homes) and associated works
 Date of site visit by Reporter: 31 March 2022 
Date of appeal decision: 1 September 2022
Page 40 of 80

Page 41

PPA-290-2061  2
boundary for Gorebridge, and in an area designated as countryside.  LDP policy RD 1
(‘Development in the countryside’) outlines the limited circumstances in which development
may be permitted in the countryside.  The proposed development is incapable of aligning
with any of the exceptions the policy provides to the otherwise general presumption against
development in this location.  The development would be directly contrary to policy RD 1 on
this basis. 
4. The appellant’s case for why the development ought to be granted consent is both
predicated and reliant on the assertion that in Midlothian, there is an insufficient effective
housing land supply.  This is in the context of the provisions of SESplan policy 6 (‘Housing
land flexibility’), which requires each constituent planning authority to maintain at least five
years’ effective housing land supply at all times.  In turn, policy 7 (‘Maintaining a five year
housing land supply’) permits the release of unallocated greenfield sites where necessary to
maintain a five years’ effective housing land supply, subject to more detailed criteria also
being satisfied.  LDP policy STRAT 2 similarly also relaxes the presumption against housing
development outwith built-up areas where a housing land shortfall emerges. 
5. Whilst SESplan pre-dates Scottish Planning Policy (SPP) 2014, in this regard it is
consistent with SPP paragraph 123 which also requires planning authorities to maintain
enough effective land for at least five years.  Where a shortfall emerges, paragraph 125 of
SPP makes clear that development plan policies for the supply of housing land will not be
considered up-to-date.  In accordance with SPP paragraph 33, this would engage the
presumption in favour of development which contributes to sustainable development as a
significant material consideration.  The scale of any shortfall would also affect the weight, or
in other words the ‘the tilted balance’ in favour of development, which would need to be
outweighed by significant and demonstrable adverse impacts in order for the refusal of
planning permission to be justified in the overall planning balance.   
6.   In city regions, the starting point for assessing the adequacy of the current effective
housing land supply is the housing supply target and housing land requirement set by the
strategic development plan.  In this regard, the age of SESplan and the fact that it is
overdue for replacement means that it does not provide a sufficiently forward-looking figure
against which the adequacy of land supply can be assessed.  The figures stated for
Midlothian (which appear in the SESplan supplementary guidance ‘Housing land’ published
in November 2014) only extend to 2024.  It is therefore impossible to calculate how much
effective housing land would be enough for at least five years.   
7. This situation with the development plan prevents me from being able to assess the
sufficiency of the housing land supply.  Whilst the SPP presumption is engaged as a
significant material consideration in this case by virtue of this aspect of the development
plan being out-of-date, a finding of a shortfall in the effective housing land supply would
require the tilted balance to be applied, as outlined above, in addition to SESplan policy 7. 
However, there is no way in which a definitive finding on the adequacy of the housing land
supply can be reached when the figures stipulated by SESplan (and repeated in the LDP)
do not apply beyond 31 March 2024.  It would be inappropriate for me to attempt to reach a
finding by applying my own assumptions or some other approach which deviated from the
five-year requirement, because this would not be adequately grounded in policy or
evidence.   
8.   Notwithstanding this finding, I consider there is still some merit in exploring what the
available evidence indicates in regard to the housing land supply situation.   The appellant
and council have presented their respective positions on how this matter should be
approached, and I also sought further written submissions to further explore the issue.  In
Page 41 of 80

Page 42

PPA-290-2061  3
the absence of any satisfactory alternative to an up-to-date housing land requirement, I am
reliant on other evidence to establish whether, on balance, it would be reasonable for the
appeal to be determined in accordance with the normal provisions of the development plan
relating to housing, or whether a shortfall in housing land could more fairly be assumed at
this time. 
9.  I do not consider that calculations based on housing figures in the rejected
replacement SDP (SESplan2) or in draft National Planning Framework 4 (NPF4) provide
any basis for reaching conclusions on the adequacy of the current effective housing land
supply, given the respective statuses of these documents.  The expected adoption of NPF4
later this year is an important material consideration in my view, the reasons for which I
return to below, but I do not consider that weight can be given to housing figures for
Midlothian set out in the draft version, particularly given these could be subject to
(potentially significant) change.     
10. The LDP states that the current housing land requirement for the overall plan period
to 2024 is for 12,490 homes.  The appellant has highlighted that the means by which this
figure was set in the LDP (i.e. by not applying a generosity margin to the SESplan figure,
which is also 12,490) was inconsistent with the approach taken in the Edinburgh LDP and
West Lothian LDP examinations.  However, the question of whether a generosity allowance
should be added was a matter which was expressly considered during the examination of
the Midlothian LDP.  There would be no justification to now interpret the housing land
requirement stated in the LDP as a housing supply target to which a generosity margin
should be added.  To do so would disregard what the LDP deliberately states. 
11. Based on information contained in the housing land audits for 2018, 2019, and 2020
(and whilst being mindful of the limitations of accurate forward programming), this provides
some indication of whether or not, at those points in time during the current plan period,
there was likely to have been at least five years’ effective housing land supply.     
12. The council has applied the average methodology (which is simply based on the
annualised requirement multiplied by five) whilst the appellant has made the case for why
the residual methodology (which takes account of completions to date) ought to be
favoured.  Ultimately I can see advantages and disadvantages of both options. 
Government policy does not stipulate which methodology ought to be favoured, and neither
option can be deemed to be definitively right or wrong.   
13. The respective methodologies unsurprisingly give starkly contrasting results.  
In 2018, 2019 and 2020, the average methodology indicates that an effective land supply
sufficient for in excess of six years could have been demonstrated at the time of each audit. 
Meanwhile using the residual methodology would indicate less than a five-year effective
supply, with the shortfall growing year-on-year from 1,049 units in 2018 to 2,002 units 
in 2020.   
14. Regardless of which methodology is used, as already explained it is impossible to
make an up-to-date calculation of how much land would represent a five-year effective
housing land supply when there is not a housing land requirement applicable to the next
five years.  Furthermore, even if it was accepted that a shortfall may have existed at other
points in time during the current plan period, it does not necessarily follow that a shortfall
would still exist today.   
15. What is not in dispute between the appellant and council is the number of homes
which have been built so far in the current plan period.  In the 12 years between 2009 
Page 42 of 80

Page 43

PPA-290-2061  4
and 2021, a total of 6,809 homes have been completed in Midlothian.  That leaves three
years before the end of the plan period for a further 5,681 homes to be completed, if the
housing land requirement of 12,490 homes to be built between 2009 and 2024 is to be
achieved.  The council has indicated that the draft 2022 housing land audit records that at
least 802 units have been completed between April 2021 and March 2022.  On that basis,
this would leave two years for in the region of 4,879 homes to be built if the number of
homes required to be built during the current plan period is to be met.  I have seen nothing
to suggest that this would be achievable, and given this would require the rate of annual
completions to be at least three times higher than has been achieved so far in any other
year during this plan period, in my view it is inconceivable that completions will be sufficient
to align with the housing land requirement for the plan period.           
16. Whilst housing completions are almost certainly going to fall some way short of the
number required during the overall plan period, this does not in itself demonstrate that an
insufficient effective housing land supply must have been the cause, or that a land supply
shortfall must exist now.  The council has referred to various external factors outwith its
control which has supressed completion rates.  These include the 2008/9 recession and,
very recently, the pandemic.  I am in no doubt that such significant influences would be
capable of adversely affecting housing completion rates.  That said, as the appellant has
highlighted, there would have been various options available to the council to respond to a
reduced rate of completions and site-specific delays through its action programming, which
may have limited the scale of the emerging shortfall across the overall plan period.   
17.   It is relevant to note that, across the plan period of 2009 – 2024, the 2017 LDP
predicted a total housing land supply of 12,997 (i.e. 507 units more than the overall housing
land requirement).  There do not appear to have been any obvious deficiencies in the
overall supply situation at the point at which the LDP was adopted, which could have
signalled that a shortfall in the effective land supply could be anticipated to emerge during
the plan period.  That said, all supply assumptions have their limitations, and they can
rapidly alter. 
18. As I have already outlined, in the absence of a sufficiently forward-looking housing
land requirement, it is impossible to make a finding on whether the council is currently
maintaining at least a five-year effective housing land supply.  Based on other relevant
evidence and indicators, and in particular the fact that the number of homes likely to be
completed by 2024 will fall some way short of the number that had been planned for in this
period, there is some cause to assume that a more generous supply of effective housing
land may have lessened this shortfall.  Planned sites have either failed to become effective
when envisaged, and/or the build-out rates have not kept pace with programming.  In either
scenario, the identification and release of additional sites may have to some extent enabled
this increasing shortfall in actual completions to have been avoided.   
19. In practice I am rather sceptical that supply is to blame for the under-delivery of new
homes in Midlothian.  Given the rate of delivery has been less than expected (and noting
the various other influences which have affected build-out rates and/or the uptake of sites in
this period) I have difficulty with the notion that a release of additional sites would have led
to any notable increase in completion rates.   
20. There is also still a distinction to make between the effective land supply and actual
completion rates, and I recognise that the need to rely on other evidence and assumptions,
rather than an up-to-date housing land requirement, is in itself a rather unsatisfactory
situation for both the appellant and the council.  The absence of a sufficiently up-to-date
housing land requirement in my opinion represents a failure of the plan-led system.  The
Page 43 of 80

Page 44

PPA-290-2061  5
only meaningful proxy measure of the adequacy of ‘supply’ is now completion rates, and
despite the limitations of this approach, I find this to be the best available evidence.  On this
basis, I shall for the purposes of this assessment assume that a shortfall in the effective
housing land supply exists.  Noting the scale of shortfall in completions relative to the
housing land requirement, I take this to indicate that a moderate angle of tilt in favour of the
development should be applied in this regard, to be taken forward into the overall planning
balance. 
21. Having reached this conclusion, a relevant material consideration is whether the
delivery of housing on the site would help to address the assumed shortfall in an
appropriate timeframe.  Where new homes would not be completed until after 2024 (being
the date against which a shortfall in actual completions can be anticipated), it follows that
these would do nothing to address the shortfall by the end of the current plan period.  In
such circumstances it is fair to consider whether any housing completions on the site
beyond 2024 should be afforded the same weight as those which would help to lessen the
shortfall during the plan period.       
22. Furthermore, it is a well-established principle that development plans, and plan
periods, operate independently from one-another, the practical effect of which is that
(under)-performance against a previous plan does not fall to be taken into account in
development management decisions made under a current, up-to-date development plan. 
In other words, when a new development plan is published which sets a new housing land
requirement (or equivalent) for Midlothian, this will effectively ‘reset’ the housing situation
entirely, and there would be no need or expectation to have ongoing regard to shortfalls
against targets in a superseded development plan.  In reaching this conclusion, I note and
draw support from the appellant’s own view expressed in paragraph 1.42 of its further
written submissions (which I appreciate was made in support of a different argument),
where it asserts that “Any shortfall arising against those [2009-2024] housing figures will
exist in perpetuity until such time as a new development plan is approved and adopted”.   
23. In paragraph 9 I have already alluded to the relevance of NPF4 in this case.  It
cannot be ignored that NPF4 is expected to be published during 2022.  Even if this current
timescale was to experience some delay, there is no reason to envisage its publication
being pushed back to beyond 2023.  Once published, NPF4 will be part of the development
plan and will, with immediate effect, provide a minimum all-tenure housing land requirement
for Midlothian.  This means that by the earliest date that the proposed development could
conceivably provide any housing completions (i.e. during 2023), the housing land
requirement would have already been reset.  In policy terms at least, any homes built on
this site would be counted as contributing to meeting the new NPF4 requirement, rather
than reducing the scale of a shortfall in completions relative to a requirement set in SESplan
(that is out-of-date and which will have been formally superseded by NPF4).   
24. Ultimately however, until NPF4 is published in its final form I consider the most
pragmatic approach is to consider the proposal in the context of how the additional housing
could help to address the housing supply situation as it presents itself today.  Having found
that a shortfall should in this case be assumed, there is nothing before me to indicate that
the appeal site is not effective, and therefore it is capable of helping to remedy the assumed
shortfall, albeit that the majority of completions would be beyond the current plan period. 
Whilst a future policy resolution to the shortfall can be anticipated as imminent, I do not
consider this to currently outweigh the case for releasing additional land for housing.   
25. In principle, the proposal aligns with and benefits from the support of SESplan 
policy 7, on the basis of my assumption that an effective housing land shortfall exists. 
Page 44 of 80

Page 45

PPA-290-2061  6
Compliance or otherwise with policy 7 overall is however subject to three criteria (a-c) as
outlined in the policy.  I consider these in turn below. 
(a) Would the development be in keeping with the character of the settlement and local
area? 
26. A landscape and visual appraisal has been prepared in support of the proposal.  I
have had careful regard to the reasoning and findings of this document, related
submissions and matters discussed in correspondence between the appellant and council,
before reaching my own conclusions.  I also referred to the appraisal during my site
inspection.   
27. The proposed development would represent a substantial urban extension to the
southeast of Gorebridge.  The site is relatively elevated, in parts steeply sloping, and the
eastern boundary of the site broadly follows the ridgeline which is well defined in views from
the west.   
28. In plan form, the development would appear to extend southwards to a broadly
comparable extent to other recent residential development on the south side of Gorebridge,
located further to the west.  However, given the elevation and topography of the appeal site,
this development would in my opinion have notably more pronounced landscape and visual
effects than those other recent schemes.  The substantial tract of intervening agricultural
land between the appeal site and recent development to the west means that, in practice,
there would be very little, if any, sense of the developments visually relating to one-another. 
Instead it would result in the proposed development appearing as a relatively isolated,
linear, even sprawling, incursion into a highly prominent area of countryside.       
29. Considered as a whole, the site would poorly visually relate to Gorebridge, and other
residential developments on the south side of the settlement do little to alter this perception. 
Those developments are at a significantly lower level.  The residential development
immediately to the north of the appeal site, on the opposite side of Lady Brae, is more
comparable in that it occupies a relatively elevated position.  However, the levels are still
noticeably lower than the majority of the appeal site.  It is also apparent that care has
previously been taken to establish Lady Brae as a strong and defensible urban edge in this
location, and in landscape and visual terms this has been successful in my opinion. 
30. This is not to say that the entirety of the appeal site is necessarily devoid of
development potential due to the nature of resultant landscape and visual effects. 
Furthermore, adverse effects need to be balanced against the importance of addressing the
housing supply shortfall.  However, I have particular concern over the landscape and visual
effects which would occur from the development of the site to the south side of Stobs Farm
(considered as ‘compartments’ B and C in the landscape and visual appraisal).  Whilst I
note the potential for landscaping and planting plans to some extent soften the
development’s appearance over time, in my view it would be unlikely to adequately mitigate
the adverse effects of developing the site.  The development would remain highly prominent
due to its elevation and gradient across the site.     
31. I find that the southernmost parts of the site in particular would have a
disproportionately greater impact than the part of the site closer to Lady Brae 
(‘compartment A’).  Development of compartments B and C would starkly encroach into an
area with an otherwise obviously more rural character, which contributes both to the setting
of Gorebridge as well as forming a rural backdrop in other views, in areas more firmly within
a countryside context, to the east and south.  The photomontages for viewpoints 1, 2, 5 
Page 45 of 80

Page 46

PPA-290-2061  7
and 6 provided in the landscape and visual appraisal together illustrate examples of the
effects of the development at both shorter and longer range, and show how the visual
influence of the development extends considerably further than other parts of Gorebridge. 
They also illustrate a rather disjointed relationship with the current, well defined urban edge
and pattern of more recent development. 
32. All told, I find the proposal would represent an undesirable and excessive incursion
of development in a highly prominent part of the landscape, giving rise to significant
adverse landscape and visual effects to the detriment both of the character of Gorebridge
and its setting, and by virtue of the development’s influence upon wider areas of
countryside.  On this basis, the development would fail to accord with criterion (a) of
SESplan policy 7, and it would also be contrary to LDP policy ENV 7 (‘Landscape
character’). 
(b) Would the development undermine green belt objectives?     
33. The appeal site is not within the green belt and therefore it would have no bearing
upon the objectives of green belt designations.  Accordingly, the proposal would comply
with criterion (b) of SESplan policy 7. 
(c) Is any additional infrastructure required as a result of the development either committed
or to be funded by the developer? 
34. It is reasonable to expect that any development of this scale and type would require
additional infrastructure in order to be satisfactorily accommodated.  In this case and based
on the responses of relevant consultees, I am satisfied that the vast majority of
infrastructure matters (such as road improvements, public transport links and utilities) are
capable of being satisfactorily addressed through the use of appropriate conditions and/or a
legal agreement. 
35. The only matter relating to infrastructure over which there is ongoing dispute
between the appellant and council is in regard to the capacity of local schools to
accommodate additional pupils from the development.  I sought further written submissions
on this matter, and it is clear from the respective positions of the council and appellant that
disagreement over the scale and duration of any potential capacity issues stem from the
assumptions used in the respective assessments.     
36. Regardless of the precise scale of any predicted capacity issues, there is a need to
identify the potential solutions in order to overcome the constraint in education capacity.  In
this regard, the appellant has outlined various measures which it considers could be
employed in order to ensure that sufficient school capacity would be maintained, and it has
confirmed that it would be agreeable to making a proportionate financial contribution
towards these.  The council has not agreed that these measures would be deliverable or
appropriate, but critically it has not put any alternative solutions forward.  In effect therefore,
education capacity constraints are in this instance being presented by the council as an
insurmountable constraint to any further housing development in Gorebridge       
37. In my view, the council’s position is at odds with the thrust of SESplan policy 7 and
its intention to enable the release of additional housing land if needed.  Criterion (c) of the
policy recognises that infrastructure requirements may exist, and it places the onus on the
developer to meet the costs of a solution where one is not already committed.  The policy
does not envisage a situation that infrastructure capacity would act as an absolute
Page 46 of 80

Page 47

PPA-290-2061  8
constraint to development even in the face of a developer’s agreement to meeting
proportionate costs to resolve the matter.     
38. In this context, I do not consider it to be satisfactory for the council to indicate that
there is an education capacity problem but fail to present solutions to it (whether temporary
or permanent).  In the absence of any agreement over what ultimately may be the most
appropriate means of resolving the capacity constraints identified, I simply note that the
appellant has confirmed its agreement to meeting proportionate costs for necessary
measures.  In doing so, and subject to this being secured as necessary, the requirement of
policy 7(c) would be satisfied.   
Overall planning balance 
39. The principle of development - and therefore the outcome of this appeal - ultimately
rests on whether the additional housing being proposed, or the resultant landscape and
visual effects, ought to be afforded the greater weight in the overall planning balance. 
There are a range of other relevant matters (including economic impact; accessibility;
ecology; and use of prime agricultural land for development) but there are none which I
consider to be individually capable of being pivotal to the question of the acceptability of the
principle of residential development at this location. 
40. The proposed development would be contrary to SESplan policy 7, on the basis that
the development would be in conflict with criterion (a).  However, that in itself does not
mean that planning permission should be refused, particularly given the development plan
is out of date and as an effective housing land shortfall is assumed.  It is entirely possible
that the importance of increasing the housing land supply, and ultimately delivery of new
homes, could still outweigh the adverse impacts of development, when a tilted balance is
applied in recognition of the assumed housing situation.     
41. In considering whether this development would contribute to sustainable
development, I have also had regard to the terms of SPP and the six qualities of successful
place outlined therein.  I find the proposal would fail to align with the attributes of a
‘distinctive’ development by virtue of part of the site’s particularly poor relationship to the
existing settlement form, landscape setting and topography.  The landscape and visual
effects would be disproportionately harmful for a development of this scale, for the reasons
outlined in my foregoing assessment. 
42. I have previously noted that the timing of the development is a material
consideration, in the context that NPF4 is expected to be published this year.  However,
even if this matter is set aside entirely and I assume that there is both an ongoing effective
housing land shortfall and no prospect of an imminent policy resolution to it, I still reach the
same conclusion that the development proposed would not represent a sustainable form of
development overall on the basis of its landscape and visual impact.   
43. Once NPF4 is published, it would be for the council to establish whether additional
sites would need to be allocated in this area and, if so, whether any parts of the appeal site
would be an appropriate option to take forward into a future iteration of the LDP.  That
process would inevitably take account of the locations of any other further allocations in and
around Gorebridge and their physical relationship to one-another.  This appeal decision
relating to the full site area as proposed, and in the context of the current pattern of
development, would not fetter the council’s ability to reconsider the site, or parts of it, for
housing at a future point in time and in the wider context of plan-making.         
Page 47 of 80

Page 48

PPA-290-2061  9
44. As it stands however, for the reasons set out above, the proposed development does
not accord overall with the relevant provisions of the development plan.  Having applied the
presumption in favour of development which contributes to sustainable development as a
significant material consideration in this case, and having also applied a moderate tilted
balance in recognition of the assumed housing shortfall, I still conclude that there are no
material considerations which would be sufficient to justify granting planning permission in
the face of the significant adverse effects I have identified.  I have considered all the other
matters raised, but there are none which would lead me to alter my conclusions. 
Christopher Warren
Reporter 
Page 48 of 80

Page 49

Planning Committee
Tuesday 11 October 2022
Item No: 5.4
APPLICATION FOR PLANNING PERMISSION 22/00066/DPP FOR
ERECTION OF 96 DWELLINGS; FORMATION OF ACCESS ROAD, CAR
PARKING, SUDS, LANDSCAPING AND ASSOCIATED WORKS AT LAND
AT NEWBYRES SITE B, RIVER GORE ROAD, GOREBRIDGE
Report by Chief Officer Place
1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1 The application is for the erection of 96 dwellings, the formation
of access road, car parking, sustainable urban drainage system
(SUDS), landscaping and associated works on land at Newbyres
Site B, River Gore Road, Gorebridge.
1.2 There have been 71 representations (69 objections and two in
support) and consultation responses from the Coal Authority, the
Scottish Environment Protection Agency (SEPA), Scottish Water,
Network Rail, the Council’s Archaeological Advisor, the Council’s
Ecological Advisor (TWIC), the Council’s Policy and Road Safety
Manager, the Council’s Flooding Officer, the Council’s Education
Resource Manager, the Council’s Land Resources Manager and
the Council’s Senior Manager Protective Services.
1.3 The relevant development plan policies are Policy 5 and 7 of the
South East of Scotland Strategic Development Plan 2013
(SESplan) and policies STRAT 1, DEV2, DEV3, DEV5, DEV6, DEV7,
DEV9, TRAN1, TRAN2, TRAN5, IT1, ENV2, ENV7, ENV9, ENV10,
ENV11, ENV15, ENV17, ENV18, ENV24, ENV25, NRG6, IMP1, IMP2
and IMP3 of the Midlothian Local Development Plan 2017 (MLDP). 
1.4 The recommendation is to grant planning permission subject to
conditions and the applicant entering into a planning obligation to
secure contributions towards necessary infrastructure and the
provision of affordable housing.
2 LOCATION AND SITE DESCRIPTION
2.1 The application site occupies some 4.57 hectares of land on the
western edge of Gorebridge.  It includes the majority of the land (apart
from an area of approximately 1 hectare of land adjacent to its south
western corner) comprising the allocated, committed, housing site h24
in the Midlothian Local Development Plan 2017.  Mature woodland
Page 49 of 80

Page 50

bound the site to the northwest and west and playing fields in Gore
Glen lie beyond the woodland further to the northwest.  Existing private
houses and their associated gardens bound the site to the north,
northeast and east.  These private houses are part of the development
known as the Birchwood Estate. The Borders Railway line bounds the
site to the south. 
2.2 The site is on the southwest facing slope of the Gore Water Valley. 
There is an average gradient of around 1 in 15 over the major part of
the site, which increases to up to 1 in 8 in more localised areas towards
the southern site boundary.  The majority of the site is rough grassland. 
3 PROPOSAL 
3.1 Detailed planning permission is sought for 96 residential
dwellinghouses with associated roads, landscaping, open space,
footpath/cycle ways, a sustainable urban drainage system (SUDS) and
other associated works.  The details comprise: 
• 96 dwellinghouses, including affordable housing (24
dwellinghouses);
• Formation of one new primary vehicular access road taken from
River Gore View and an internal loop road within the site;
• Two private drives to serve houses; 
• Provision of a 3m wide multi-user cycle path centrally from the
north of the site to the south west of the site; 
• Open space located centrally within the site.  A further area of
open space is delivered around the proposed SUDS pond at the
south west corner of the site;
• Provision of a SUDS pond at the south west of the site with
associated infrastructure;
• Provision of visitor parking including electric vehicle parking;
• Provision of a series of 2m wide pedestrian footpaths throughout
the site;
• The provision of landscaping and new planting; and 
• Provision of new equipped play area at the north east of the site. 
3.2 With respect to the proposed housing, the average housing density
comprises approximately 21 dwellings per hectare (considered to be
low density) and would consist of the following housing mix: 
House Type:      Number: 
Affordable Housing:
2-bed       12
3-bed      12 
Market Housing:
2-bed        8
Page 50 of 80

Page 51

3-bed      11
4-bed      46
5-bed        7 
Total Dwellings     96 
3.3 The proposed dwellinghouses are formed of 16 housetypes, all of
which show two storey buildings with pitched roofs.  All have primary
ridge lines perpendicular to their front elevation.  The roofs will be pan-
tiled to reflect existing development in the area.  The primary building
material will be brick, and the site will exhibit three primary varieties of
brick to promote variation.  
3.4 Boundary treatments are proposed to be timber fencing on the majority
of rear boundaries with some walling proposed for prominent, highly
visible boundaries. 
3.5 The application is accompanied by the following documentation:
• Previously confirmed Pre-Application Consultation Report (PAC); 
• Design and Access Statement (DAS)
• Acoustic Report (June 2022);
• Noise Survey (April 2016);
• Odour Assessment (September 2017);
• Odour Survey And Risk Assessment (August 2022);
• Previously submitted Transport Assessment and Appendices (TA);
• Previously submitted Flood Risk Assessment (2012);
• Previously submitted Site Investigation Report (March 2007);
• Preliminary Ecology Assessment (October 2021); 
• Tree Survey (March 2021); 
4 BACKGROUND 
4.1 The site, together with the further area of land referenced in paragraph
2.1 of this report, was first allocated for residential development in the
2003 Midlothian Local Plan. 
4.2 In August 2011 the Council granted detailed planning permission
(07/00351/FUL) for the erection of 76 houses, the formation of an
access road, SUDS pond and associated works on the site.  This
permission was not implemented and has expired.   
4.3 The applicant carried out a pre-application consultation
(13/00609/PAC) for residential development on the site in 2013.   
4.4 Application 17/00435/DPP for the erection of 117 dwellinghouses and
associated works on the site was withdrawn. 
4.5 The proposal is classed as a Major Development, as defined by the
Town and Country Planning (Scotland) (Hierarchy of Developments)
Regulations 2009.  Therefore, the applicant has certain obligations in
Page 51 of 80

Page 52

relation to pre-application consultation with the community.  The
applicant submitted a proposal of application notice to the Council
(13/00609/PAC) and the application is accompanied by a pre-
application consultation report which details the consultation
methodology and the feedback gained from this process. 
5 CONSULTATIONS 
5.1 The Coal Authority does not object to the application and advise that
“the content and conclusions of the information prepared by Mason
Evans Partnership Limited is sufficient for the purposes of the planning
system in demonstrating that the application site is safe and stable for
the proposed development. 
5.2 The Scottish Environment Protection Agency (SEPA) has lodged a
holding objection to the application on flood risk grounds.  Their
objection is based on a lack of information provided by the applicant to
date.  They have further stated that this objection would further relate
to SUDS and Drainage and the interaction with a burn adjacent to the
site’s northwest boundary.  It is noted that the applicant has
subsequently submitted a Flood Risk Assessment (FRA) for
consideration that may address the above concerns.  However, until
SEPA have been able to review this information, there is no guarantee
that the FRA will adequately address Flood Risk and Drainage
concerns they have raised. 
5.3 Scottish Water does not object to the application.  They advise that
there is currently sufficient capacity within the Rosebery Water
Treatment Works for future water supply.  However, it was noted that
capacity of the Gorebridge Waste Water Treatment Works could not be
confirmed and that a detailed Pre-Development Enquiry is required to
be provided to consider future connection.  They also note that future
capacity cannot be reserved and that capacity will be reviewed upon
any formal connection application being submitted to Scottish Water. 
The capacity at the said facilities is a matter between the developer
and Scottish Water and subject to a separate regulatory process
outwith the remit of the Council. 
5.4 Network Rail does not object to the application, but do raise a number
of concerns for the development that would have to be addressed and
suggest conditions to ensure: 
• A suitable trespass proof fence of at least 1.8 metres in height
adjacent to Network Rail’s boundary and provision for the fence’s
future maintenance and renewal should be made. 
• That no construction work will commence until a construction
method statement, which includes plant details, locations and lifting
plans, is submitted to the planning authority for approval in
conjunction with Network Rail’s Asset Protection Engineers.
Page 52 of 80

Page 53

• No development shall take place on site until such time as a noise
impact assessment has been submitted to and approved in writing
by the planning authority. 
5.5 The Council’s Archaeological Advisor does not object to the
application stating that the proposed application area was already
subject to archaeological evaluation by trial trenching back in 2008,
and no further archaeological works are recommended as a result of
the proposal.  
5.6 The Council’s Ecological Advisor – The Wildlife Information
Centre (TWIC) does not object to the application subject to a condition
ensuring that the recommendations within the applicant’s Ecological
report/s are implemented.  The recommendations are set out in section
8 of this report. 
5.7 The Council’s Policy and Road Safety Manager does not object to
the application, but did raise concerns regarding the number of visitor
parking spaces and the location of the electric vehicle charging parking
spaces and the need for further details to be secured by condisions. 
Amendments to the proposed development have subsequently been
undertaken to address the concerns. 
5.8 The Council’s Flooding Manager does not object to the application but
requests that further details regarding SUDS should be provided.
These should include cross-sections showing the proposed invert level,
1:200 year flood level (0.5% probability of flooding) + CC (Climate
Change) and any retention required due to the change in ground
levels.  The sections should include the maintenance access track
required by Scottish Water and the road, cycleway/footway and verge
arrangement to the north. 
5.9 The Education Resources Manager does not object to the
application, but advise, contributions towards education facilities would
be required.  The catchment schools are: 
• Non-denominational primary Gorebridge Primary School
• Denominational primary St Andrew’s RC Primary School
• Non-denominational secondary Newbattle High School
• Denominational secondary St David’s RC High School 
5.10 The Council’s Land Resources Manager does not object to the
application. 
5.11 The Council’s Senior Manager Protective Services does not object to
the application, subject to conditions securing: 
a. An updated site investigation report shall be submitted to and
approved by the Council. This will need to include
Page 53 of 80

Page 54

recommendations for further remediation as required by the
findings where necessary.
b. Validation reports to be completed prior to occupation of dwellings.
c. Limits to construction hours.
d. The preparation of a Construction and Environmental Management
Plan (CEMP) covering the following matters:
• Noise control measures
• Dust control measures
• Plant and Machinery
• Vehicle movement routes
• Site Management
e. The installation of trickle ventilation on properties closest to the
Boarders Railway to allow for ventilation with closed windows and
thus mitigate noise. 
6 REPRESENTATIONS 
6.1 There have been 71 representations received, which can be viewed in
full on the online planning application case file.  69 of representations
object to the application and two support the application.  A summary
of the main points raised are as follows:
• The infrastructure, services and facilities within Gorebridge are
insufficient to cater for new housing development;
• The traffic on local roads has increased and concern that the
relevant information submitted is out of date;
• The proposed access route is down a narrow road and residents
amenity would be harmed by increased traffic;
• The Ecology report has not addressed the developments impact on
hedgehogs sufficiently; 
• The development would result in the loss of valued open space
used for walking by local residents;
• The development takes access from development served by one
main vehicular access point - this is a safety concern;
• The proposed access would cut through existing green space;
• Development would generally harm the wildlife in the area;
• Safe routes to school need to be secured;
• Construction vehicles would damage roads and cause nuisance;
• Public consultation was only carried out by the developer in 2013;
• The proposed development does not take into account existing
trees;
• The Transport Assessment is out of date;
• The SUDS need to be completed prior to the completion of the
housing because of concerns over flood risk;
• The developer needs to consult with Scottish Water regarding the
adoption of the SUDS;
• The area of open space appears to be reduced; 
• The relevant consultees were not consulted;
• The development would deliver houses to help meet a national
shortfall;
Page 54 of 80

Page 55

• Footpaths should be lit;
• Larger houses are needed for working from home purposes;
• Some of the proposed dwellings are too high for the site;
• The 2005 development brief has not been taken into account;
• The development would hinder efficient water supply;
• The proposal states that emergency vehicles could access the site
via a footpath along the side of Arniston Rangers Football Pitch –
this is incorrect;
• Development should extend the existing path at the south west of
the site to join up with the bottom of Birchwood to allow cyclists and
walkers a path around the development to access Gore Glen;
• The privacy of existing residents would be reduced;
• The proposed development exceeds the capacity of the site;
• The proposed development does not respond positively to existing
development;
• The pumping station is located at a higher level than some
dwellings;
• Solar Panels should be provided on all homes;
• The proposal does not provide any affordable housing;
• The development would spoil a rural outlook; and
• The equipped play area would attract anti-social behaviour. 
7 PLANNING POLICY 
7.1 The development plan is comprised of the Edinburgh and South East
Scotland Strategic Development Plan (June 2013) and the Midlothian
Local Development Plan 2017. 
7.2 SESplan June 2013 is older than five years. A replacement SESplan
was prepared but rejected by Scottish Ministers in May 2019. The
Planning etc. (Scotland) Act 2019 removed the duty to prepare
Strategic Development Plans, placing strategic planning matters within
a National Planning Framework 4 (NPF4) to be prepared by Scottish
Ministers.  Once approved, NPF4 (which was subject to consultation
until 31 March 2022 and is expected to be adopted in autumn 2022)
will form part of the development plan alongside local development
plans.  Until NPF4 is approved, SESplan remains part of the
development plan albeit increasing out of date. 
7.3 The following policies are relevant to the proposal: 
Edinburgh South East Scotland Strategic Development Plan 2013
(SESPlan) 
7.4 Policy 5 (HOUSING LAND) requires local development plans to
allocate sufficient land for housing which is capable of becoming
effective in delivering the scale of the housing requirements for each
period.  
Page 55 of 80

Page 56

7.5 Policy 7 (MAINTAINING A FIVE YEAR HOUSING LAND SUPPLY)
states that sites for greenfield housing development proposals either
within or outwith the identified strategic development areas may be
allocated in local development plans or granted planning permission to
maintain a five years’ effective housing land supply, subject to
satisfying each of the following criteria: (a) the development will be in
keeping with the character of the settlement and local area; (b) the
development will not undermine green belt objectives; and (c) any
additional infrastructure required as a result of the development is
either committed or to be funded by the developer. 
Midlothian Local Development Plan 2017 (MLDP)   
7.6 Policy STRAT1: Committed Development seeks the early
implementation of all committed development sites and related
infrastructure, facilities and affordable housing, including sites in the
established housing land supply. Committed development includes
those sites allocated in previous development plans which are
continued in the MLDP.  
7.7 Policy DEV2: Protecting Amenity within the Built-Up Area states
that development will not be permitted where it would have an adverse
impact on the character or amenity of a built-up area. 
7.8 Policy DEV3: Affordable and Specialist Housing seeks an affordable
housing contribution of 25% from sites allocated in the MLDP. 
Providing lower levels of affordable housing requirement may be
acceptable where this has been fully justified to the Council.  This
policy supersedes previous local plan provisions for affordable housing;
for sites allocated in the Midlothian Local Plan (2003) that do not
benefit from planning permission, the Council will require reasoned
justification in relation to current housing needs as to why a 25%
affordable housing requirement should not apply to the site.   
7.9 Policy DEV5: Sustainability in New Development sets out the
requirements for development with regards to sustainability principles. 
7.10 Policy DEV6: Layout and Design of New Development states that
good design and a high quality of architecture will be required in the
overall layout of development proposals.  This also provides guidance
on design principles for development, materials, access, and passive
energy gain, positioning of buildings, open and private amenity space
provision and parking. 
7.11 Policy DEV7: Landscaping in New Development requires
development proposals to be accompanied by a comprehensive
scheme of landscaping.  The design of the scheme is to be informed by
the results of an appropriately detailed landscape assessment. 
Page 56 of 80

Page 57

7.12 Policy DEV9: Open Space Standards sets out the necessary open
space for new developments. This policy requires that the Council
assess applications for new development against the open space
standards as set out in Appendix 4 of that plan and seeks an
appropriate solution where there is an identified deficiency in any of the
listed categories (quality, quantity and accessibility).  Supplementary
Guidance on open space standards is to be brought forward during the
lifetime of the plan. 
7.13 Policy TRAN1: Sustainable Travel aims to encourage sustainable
modes of travel. 
7.14 Policy TRAN2: Transport Network Interventions highlights the
various transport interventions required across the Council area. 
7.15 Policy TRAN5: Electric Vehicle Charging seeks to support and
promote the development of a network of electric vehicle charging
stations by requiring provision to be considered as an integral part of
any new development or redevelopment proposals. 
7.16 Policy IT1: Digital Infrastructure supports the incorporation of high
speed broadband connections and other digital technologies into new
homes. 
7.17 Policy ENV2: Midlothian Green Networks supports development
proposals brought forward in line with the provisions of the Plan that
help to deliver the green network opportunities identified in the
Supplementary Guidance on the Midlothian Green Network.   
7.18 Policy ENV7: Landscape Character states that development will not
be permitted where it significantly and adversely affects local
landscape character.  Where development is acceptable, it should
respect such character and be compatible in terms of scale, siting and
design.  New development will normally be required to incorporate
proposals to maintain the diversity and distinctiveness of the local
landscapes and to enhance landscape characteristics where they have
been weakened.   
7.19 Policy ENV9: Flooding presumes against development which would
be at unacceptable risk of flooding or would increase the risk of
flooding elsewhere.  It states that Flood Risk Assessments will be
required for most forms of development in areas of medium to high
risk, but may also be required at other locations depending on the
circumstances of the proposed development.  Furthermore it states
that Sustainable urban drainage systems will be required for most
forms of development, so that surface water run-off rates are not
greater than in the site’s pre-developed condition, and to avoid any
deterioration of water quality. 
Page 57 of 80

Page 58

7.20 Policy ENV10: Water Environment requires that new development
pass surface water through a sustainable urban drainage system
(SUDS) to mitigate against local flooding and to enhance biodiversity
and the environmental. 
7.21 Policy ENV11: Woodland, Trees and Hedges states that
development will not be permitted where it could lead directly or
indirectly to the loss of, or damage to, woodland, groups of trees
(including trees covered by a Tree Preservation Order, areas defined
as ancient or semi-natural woodland, veteran trees or areas forming
part of any designated landscape) and hedges which have a particular
amenity, nature conservation, biodiversity, recreation, landscape,
shelter, cultural, or historical value or are of other importance. 
7.22 Policy ENV15: Species and Habitat Protection and Enhancement
presumes against development that would affect a species protected
by European or UK law.   
7.23 Policy ENV17: Air Quality states that the Council may require further
assessments to identify air quality impacts where considered requisite.  
It will refuse planning permission, or seek effective mitigation, where
development proposals cause unacceptable air quality or dust impacts 
7.24 Policy ENV18: Noise requires that where new noise sensitive uses are
proposed in the locality of existing noisy uses, the Council will seek to
ensure that the function of established operations is not adversely
affected. 
7.25 Policy ENV24: Other Important Archaeological or Historic Sites
seeks to prevent development that would adversely affect regionally or
locally important archaeological or historic sites, or their setting. 
7.26 Policy ENV25: Site Assessment, Evaluation and Recording requires
that where development could affect an identified site of archaeological
importance, the applicant will be required to provide an assessment of
the archaeological value of the site and of the likely impact of the
proposal on the archaeological resource.   
7.27 Policy NRG6: Community Heating requires that, wherever
reasonable, community heating should be supported in connection with
buildings and operations requiring heat. 
7.28 Policy IMP1: New Development ensures that appropriate provision is
made for a need which arises from new development.  Of relevance in
this case are education provision, transport infrastructure; contributions
towards making good facility deficiencies; affordable housing;
landscaping; public transport connections, including bus stops and
shelters; parking in accordance with approved standards; cycling
access and facilities; pedestrian access; acceptable alternative access
routes, access for people with mobility issues; traffic and environmental
Page 58 of 80

Page 59

management issues; protection/management/compensation for natural
and conservation interests affected; archaeological provision and
‘percent for art’ provision. 
7.29 Policy IMP2: Essential Infrastructure Required to Enable New
Development to Take Place states that new development will not take
place until provision has been made for essential infrastructure and
environmental and community facility related to the scale and impact of
the proposal.  Planning conditions will be applied and; where
appropriate, developer contributions and other legal agreements will be
used to secure the appropriate developer funding and ensure the
proper phasing of development.   
7.30 Policy IMP3: Water and Drainage require sustainable urban drainage
systems (SUDS) to be incorporated into new development. 
National Policy 
7.31 The SPP (Scottish Planning Policy) sets out Government guidance
for housing.  All proposals should respect the scale, form and density of
their surroundings and enhance the character and amenity of the
locality.  The individual and cumulative effects of infill must be
sustainable in relation to the social and economic infrastructure of a
place, and must not lead to over-development.    
7.32 SPP encourages a design-led approach in order to create high quality
places. It states that a development should demonstrate six qualities to
be considered high quality, as such a development should be;
distinctive; safe and pleasant; welcoming; adaptable; resource efficient;
and, easy to move around and beyond. The aims of the SPP are
developed within the local plan and local development plan policies. 
7.33 The SPP states that design is a material consideration in determining
planning applications and that planning permission may be refused and
the refusal defended at appeal or local review solely on design
grounds. 
7.34 The SPP supports the Scottish Government’s aspiration to create a low
carbon economy by increasing the supply of energy and heat from
renewable technologies and to reduce emissions and energy use. Part
of this includes a requirement to guide development to appropriate
locations. 
7.35 SPP introduces a presumption in favour of development that
contributes to sustainable development, but states:   
The planning system should support economically, environmentally and
socially sustainable places by enabling development that balances the
costs and benefits of a proposal over the longer term. The aim is to
Page 59 of 80

Page 60

achieve the right development in the right place; it is not to allow
development at any cost. 
7.36 SPP promotes a plan-led system and the starting point for any
assessment of an application for planning permission, unless material
considerations justify a departure. SPP requires planning authorities to
maintain a five year supply of effective housing land at all times. Where
a shortfall emerges, specific provisions within SPP allow for the
assessment of additional sites not allocated for housing to be
considered to make up the shortfall. Sustainable development can be
defined by the 13 principles of sustainable development set out in
paragraph 29 of SPP.  
7.37 The Scottish Government policy statement Creating Places
emphasises the importance of quality design in delivering quality
places.  These are communities which are safe, socially stable and
resilient. 
7.38 Designing Places, A Policy Statement for Scotland sets out the six
key qualities which are at the heart of good design namely identity, safe
and pleasant environment, ease of movement, a sense of welcome,
adaptability and good use of resources. 
7.39 The Scottish Government’s Policy on Architecture for Scotland
sets out a commitment to raising the quality of architecture and design. 
8 PLANNING ISSUES 
8.1 The main planning issue to be considered in determining this       
application is whether the proposal complies with development plan
policies unless material planning considerations indicate otherwise.
The representations and consultation responses received are material
considerations. 
The Principle of Development 
8.2 The site is allocated for housing (site h24) in the MLDP and is located
within the built up area of Gorebridge where there is a presumption in
favour of appropriate residential development.  This presumption in
favour of appropriate residential development is further reinforced by
the previous grant of planning permission (07/00351/FUL) for 76 units –
the site’s continued allocation for 76 units reflects this grant of planning
permission (now expired).  The site has been allocated for housing
since the 2003 Midlothian Local Plan and contributes towards the
Council’s housing land supply.  No material considerations have been
presented to outweigh the presumption in favour of development. 
Page 60 of 80

Page 61

The Supply of Effective Housing Land 
8.3 The Council is required to maintain a five year supply of effective
housing land (enough land allocated and coming forward for housing to
meet its housing targets over the next 5 years) at all times (SPP
paragraph 125).  The number of homes required in a local authority
area is identified through the Strategic Development Plan (SESplan)
and is met by the development strategy and policies of the MLDP. 
Where a shortfall in the supply of effective housing land emerges, sites
that are not allocated for residential development should be considered
as possible additional sites to make up the shortfall.   
8.4 A recent planning appeal decision in relation to residential development
at Stobs Farm, Lady Brae, Gorebridge (Reporter’s ref: PPA-290-2061,
Midlothian Council’s ref: 21/00252/PPP) is reported elsewhere on the
Committee agenda.  Whilst the proposed housing development was
dismissed the Reporter did assess submitted evidence in regards to
housing land supply.  The Scottish Government Reporter concluded
that it would be impossible to calculate how much effective housing
land would be enough for at least five years as the SESplan published
figures only extend to 2024 and SESplan2 was rejected (as previously
reported to Committee) and the Scottish Government has not yet
adopted National Planning Framework 4 (NPF4) which will set the new
housing targets for local planning authorities – the Reporter therefore
made an assumption that Midlothian does not have an effective
housing land supply.  Although, this is an assumption which the Council
may consider to be unreasonable and unfair, the appeal decision is of
significant weight as to provide further impetus to support the granting
of planning permission for residential development on allocated
housing sites such as the one proposed. 
Layout, Form and Density 
8.5 The policy framework for the assessment of the design and layout of
proposed new developments is provided by Scottish Planning Policy
2014 (SPP) and the MLDP.  Scottish Planning Policy requires that
planning should support development that is designed to a high quality
which demonstrates the six qualities of a successful place. The six
qualities are:
• Distinctive.  
• Safe and Pleasant 
• Welcoming
• Resource Efficient. 
• Adaptable
• Easy to Move Around and Beyond 
8.6 MLDP Policy DEV6: Layout and Design of New Development requires
good design and a high quality of architecture, in both the overall layout
of developments and their constituent parts.  It logically follows that a
proposed development that fails to demonstrate the six qualities of a
Page 61 of 80

Page 62

successful place and/or the requirements of Policy DEV6 should not be
supported and therefore should be refused planning permission. 
8.7 It is considered that the majority of dwellings achieve good sized
gardens having regard to Midlothian’s established approach on garden
size for dwellings with 3 apartments (rooms excluding kitchens and
bathrooms – i.e. bedrooms and living rooms) to deliver 110sqm and of
4 or more apartments to deliver 130sqm.  It is further assessed that the
spacing between proposed new dwellings within the site and existing
dwellings (outside the site) is adequate.  Whilst there are some
instances where separation distances falls marginally below the
prescribed requirement for Midlothian, they are minor shortcomings for
front to front distances, Midlothian seeks to achieve a 22m separation.
The narrowest such separation within the proposals is between plots
87 and 22 with a separation of 20m.  This falls 2m below the set
guidance.  Most dwellings fronting each other are at an angled
orientation to other dwellings. On balance sufficient privacy is
considered to be provided for dwellings. 
8.8 Similarly, Midlothian seek a 25m distance between ‘back to back’
elevations.  This is not achieved at every dwelling.  The shortest back
to back distance is at plots 32 and 29 which achieve just over a 23m
separation.  Whilst this is slightly below the requirement there is a level
change and the disparity is minor and the relationship between these
properties is at a slight angle.  As such, it is considered that on balance
sufficient ‘back to back’ distances are achieved across the site. 
8.9 The details of the proposed houses in terms of materials and the scale
of the buildings is set out at paragraph 3.3 of this report. It is assessed
that these are acceptable and compatible to the sites location and the
adjacent settlement. 
8.10 The primary vehicular entry into the site is a key visual receptor for the
site.  River Gore View is characterised by open amenity space between
it and Kirkhill Court to the southeast.  This open space provides vistas
to the southwest.  It is considered vital that the proposed development
respond positively to this open space.  The development seeks to
introduce additional open space to the southwest of the existing open
space.  This open space funnels down through the site towards the
southwest, extending the continuity of the existing built form at River
Gore View and Kirkhill Court.  Within this area development has
avoided turning its back to existing development.  In combination with
the levels at the site, the proposed area of open space would
allow/retain some longer vistas from the existing built up area. 
8.11 In addition to the above the siting of the proposed Area of Improved
Quality (AIQ), an area of enhanced design quality, around the
proposed area of open space is considered to be to its benefit and of
reflects good design principles.  The higher quality materials combined
with the open space will provide an attractive setting at the heart of the
Page 62 of 80

Page 63

site.  Open space at the centre of the site and around the proposed
SUDS pond is given a large degree of overlooking to promote positive
surveillance for these areas. 
8.12 A 3m wide multiuser route from the main vehicular entrance through
the central open space and then to the west corner provides a clear
and legible access route for users.  Whilst this is only shown to be
provided up to the boundary of the site, land to the west of the site is
within the Council’s ownership and it will be a requirement of any
development that the proposed multiuser route be connected to the
core path network. 
8.13 It is regrettable that the proposed substation at the entrance to the site
is located so prominently. Landscaping is proposed to soften this
feature. 
8.14 The levels on the site pose a significant challenge.  The proposed
development has sought to address this through a number of means.
The provision of extended garden areas for those located centrally in
the site avoids the need for retaining features at these locations.  Whilst
this does result in some garden areas having a 1:6 grading, sufficient
flat garden is provided within these plots. 
8.15 The need for retention features within the site still exists.  Midlothian
generally seeks that no retaining features be in excess of 1m in height.
There are still some requirements for 1.2m retaining structures
between some dwellings.  The majority of proposed retention between
houses in less than 1m.  It is proposed to apply a condition requiring all
retaining features over 1m in height to be criblock to allow for
opportunities to plant them to soften their impact.   
8.16 The SUDS Pond is logically located at the lowest point of the site.  The
proposed permanent water level is circa 3m below the encircling
maintenance track.  Considering the depth requirement of the feature a
pond is considered appropriate and would appear more natural than a
basin.  The proposed pond would further provide biodiversity benefits
to the development and wider environment.  Dwellings proposed to the
east and north of the pond provide some passive surveillance of the
pond, in addition to the multi user route adjacent to the pond.   
8.17 The proposed development does result in a large degree of on plot
parking in front of dwellings.  This is mitigated in some instances by
parking down the sides of dwellings, lessening their presence on the
street.  Despite this, bay and parallel parking is still required on streets.
These are generally located away from the central open space.
Landscaping is further proposed to be introduced into the scheme to
lessen the visual impact of parking. 
8.18 The proposed development further seeks to deliver dwellings at
important locations with duel aspect features. Where otherwise a
Page 63 of 80

Page 64

dwelling might present a blank/bland gable to a vantage point the
development has proposed enhanced gable detailing to minimise a
stark outlook from gable features. 
8.19 Secondary streets, such a private drives and parking courts are
appropriately differentiated with block paving. 
Landscaping and Open Space 
8.20 The sites location does mean that it boasts views to the south and west
towards the Pentland Hills, in turn the application site is to a degree
visible.  However, the proposals would sit in the context of existing
development and the site has been allocated for development of 76
dwellings.  Whilst the proposed numbers are in excess of this, the
additional impact is not considered to be significant in landscape terms.
The proposed development is therefore considered to comply with
MLDP policy DEV7. 
8.21 As has already been considered above, the positioning of open space
is appropriate.  The quantum of open space has further been assessed
against MLDP policy DEV9 and associated Appendix 4 of the MLDP. 
8.22 The proposed development would generate circa 220
persons/population.  Appendix 4 seeks that per 1000 population the
following areas of open space are required: 
• Amenity Open Space – 1.6ha
• Equipped Play Space – 0.25ha
• Informal Play Space - 0.55ha 
8.23 The proposed development delivers 0.3ha of amenity space and
designates an area of 0.05ha for an equipped play area.  In addition, it
should be noted that the proposed amenity open space measurement
does not include areas around the proposed SUDS pond.  Whilst this
area will be graded and less useable than the central open space, it will
provide some amenity area.  No space is marked for informal play.
Whilst the Amenity open space falls short of the proposed standard, the
provision of onsite play is considered to be a benefit for the site and the
wider local area facilitating integration with the neighbouring
community.  
8.24 It is assessed the development does have access to the core path
network and other open spaces within proximity to the site.
Furthermore, there are easy walking connections to local facilities.  The
provisions are therefore considered to be on balance compatible with
the objectives of MLDP policy DEV9 and Appendix 4 
Page 64 of 80

Page 65

Access and Transportation Issues 
8.25 The Council’s car parking standards give rise to a requirement for 48
visitor parking spaces within this development.  44 spaces are
proposed throughout the development via parallel and bay parking
features offset from the highway.  This represents a minor shortfall on
what would be required by guidance. 
8.26 Paragraph 42 of Scottish Planning Policy requires that new
development is to be safe and pleasant and Paragraph 271 requires
that development proposals take account of the implications on road
safety.  Despite the minor shortfall in spaces, the provision is
considered to be acceptable when the development is considered as a
whole and its proximity to local bus services (circa 400m walk from the
edge of the site).  Local bus services on Main Street and the B704
provide services 29, 48, 339, N3, R1, R2 and X29 with up to 5 buses
arriving in an hour.  Facilities within the town centre within a similar
walking distance and Gorebridge Train Station is within a 10 minute
walk and under 1km away (circa 800m). 
8.27 The provision of suitable pedestrian and cycle routes and the linking of
such routes to existing routes beyond the site are a key component of a
new development.  They provide much needed permeability, improved
accessibility and assist in integrating a new development into an
existing neighbourhood.  In this instance there is a proposed pedestrian
and cycle links through the central open space connecting to the
existing core path network past plots 37 – 41.  This is considered to be
acceptable. 
8.28 A further footpath connection is proposed to the east of plot 49 that
connects to River Gore Road.  At the southeast of the site a possible
path connection to existing footpaths is proposed.  It is acknowledged
that a connection is not able to be achieved at this time due to it being
the site boundary.  Whilst a cycle pedestrian link at this location may be
promoted by the Green Network Supplementary Planning Guidance,
the proposed development would provide a multi user route that would
provide access to Main Street (B704) within a similar travel time. 
8.29 The central loop road within the site is further defined with paved
surfacing at junctions and turns in the road.  This is beneficial in
encouraging road users to slow down. 
8.30 Access to public transport is achieved through bus stops found at
Hunterfield Road, within a 5 minute walk of the edge of the site. 
Electric vehicle charging parking spaces are proposed within the site. A
total of six are proposed. 
8.31 The proposed development is considered to comply with MLDP policies
TRAN1 and TRAN5. 
Page 65 of 80

Page 66

8.32 The Council’s Policy and Road Safety Manager is satisfied that
transportation, access and parking matters have either been addressed
or can be addressed through the imposition of conditions on a grant of
planning permission. 
Archaeology 
8.33 MLDP policy ENV25 requires that where a site could affect an identified
site of archaeological importance the applicant will be required to
provide an assessment of the archaeological value of the site and the
likely impact of the proposal on the archaeological resource.  In relation
to this site a desktop assessment was carried out followed by a
scheme of investigation of trial trenching in accordance with a written
scheme of investigation agreed by the Council’s archaeological adviser
at the time of the original planning permission for this site.  No features
of artefacts of archaeological interest were identified as a result of that
investigation and the proposed development is acceptable in terms of
archaeology in terms of MLDP policy ENV25. 
Ecology and Biodiversity 
8.34 The applicants submitted a Preliminary Ecological Appraisal dated
June 2022 in support of the application.  This has been reviewed by the
Council’s Ecology Consultee, TWIC.  Whilst they have minor comments
on the data compiled within the report they assess it as being of a
professional standard and do not raise any objections to the proposed
development and information submitted. 
8.35 Whilst no objection is raised against the application the report does
make recommendations for mitigation of impact of what habitat does
exist on the site. These recommendations include: 
• Broadleaf woodland should be retained;
• Tree root protection barriers should be utilised;
• Pre work checks should be undertaken;
• Excavations made during construction should be covered and
means of escape provided if mammals were to enter;
• vegetation clearance should not be completed during the breeding
bird season (March to August inclusive)
• Light should be temporary during construction and development
should avoid permanent light spill on existing hedges and
woodland; and 
• Any permanent lighting should be designed to be 'bat friendly' and
should not illuminate bat commuting, foraging and roosting habitats
within or adjacent to the site. 
8.36 In addition the report suggests the following opportunities for
biodiversity gain, these include, but are not limited to: 
Page 66 of 80

Page 67

• Any vegetation planting should include a wide range of native
species of local provenance, including berry or nectar producing
plants;
• The creation of species-rich grasslands or flower meadows in the
public open spaces;
• Any areas of proposed soft landscaping should be enhanced for
invertebrates by including nest boxes and/ or log piles; and
• The planting of the borders of any SUDS ponds with native aquatic
species would enhance habitat for invertebrates and increase the
waterbodies value as a foraging and breeding resource for
amphibians. 
8.37 The above mitigation and enhancements can be secured by
appropriate conditions on any grant pf planning permission. 
Flood Risk and Drainage 
8.38 The proposed development seeks to drain the development via a
SUDS Pond (permanently wet) at the lowest part of the site to the
southwest.  No objection has been raised in regards to the proposed
drainage system, but it has been set out by the Council’s Flooding
Officer that additional details of the proposed SUDS pond will be
required. This can be secured by condition on any grant of planning
permission.  As such the proposed development would seek to deliver
SUDS that would comply with MLDP policy IMP3. 
8.39 The site is not located within an area identified by SEPA’s flood maps
as being susceptible to either river flooding or surface water flooding.
However, SEPA have raised an objection to proposals based on a lack
of information in respect of flood risk and surface water drainage and
that it may place buildings and persons at flood risk contrary to SPP
and with a potential impact on the water environment. 
Potential Impact of Railway Noise 
8.40 MLDP policy ENV18 seeks to protect residential development from
noise sources without placing undue pressure on existing noise
generating uses.  The site is within close proximity to the Borders Rail
that bounds much of the site’s southern boundary.  A noise report has
been submitted with the application to determine whether the existing
railway would generate noise sufficient to have a negative impact on
the proposed dwellings.  It has been reviewed by the Council’s Senior
Manager Protective Services and found that noise levels internally and
externally within the completed development will meet the requirements
of the Scottish Government’s Planning Advice Note relating to noise
(PAN1:2011) and the accompanying Technical Advice Note (TAN) with
the exception of the internal LAmax levels at night within the nearest
residential receptors which are predicted to exceed the recommended
LAmax of 42 dB by 8 dB when windows are open for ventilation.
Mitigation of this noise is proposed within the submitted Noise Report
Page 67 of 80

Page 68

and suggests either a 4.3m acoustic barrier at the end of gardens
binding the railway, or that affected bedrooms were fitted with
acoustically attenuated trickle ventilators which would allow the
windows to remain closed and provide adequate ventilation.
Considering the amenity issues that might persist with a 4.3m fence at
the end of gardens, it is agreed with the applicant that the latter
mitigation feature (ventilation) should be delivered for plots 9 – 27. The
proposals are therefore considered to comply with MLDP policy ENV18  
Potential Impact of Odour 
8.41 The site is located close to the Gorebridge sewage works and there is
the potential that odours from this facility could be harmful to the
amenity of future residents of this site.  The applicants have provided
an assessment of the odour impact which has been considered by the
Council’s Senior Manager Protective Services, who is in agreement
with the methodology of the survey and assessment and noted that two
further rounds of monitoring had been undertaken as requested.  The
assessment has deemed that the site has the potential to have slight
adverse effects from odour from the nearby sewage works as a worst
case scenario and the overall assessment deems that odour impacts at
proposed sensitive receptors are considered to be not significant.  On
this basis they raise no objection to the application. The proposals are
therefore considered to comply with MLDP policy DEV2 in this regard. 
Ground Conditions 
8.42 In this instance the site falls within the Coal Authority defined
Development High Risk Area due to previous mineral workings.  In the
context of the site investigation report provided, neither the Coal
Authority or the Council’s Senior Manager Protective Services have
objected to the application and are satisfied that in relation to this
particular issue it would be acceptable for planning permission to be
granted, subject to the imposition of suitable conditions in relation to
addressing matters of contamination and ground conditions.  The
proposals are therefore considered to comply with MLDP policy
ENV16. 
Developer Contributions and Affordable Housing 
8.43 As noted earlier in this report planning permission was granted in 2011
for 76 dwellings.  The planning permission together with the one
relating to site h36 (North Gorebridge) were bound by a planning
obligation to secure developer contributions towards: 
• primary education capacity;
• secondary education capacity;
• Improvements to Gorebridge Town Centre;
• Community Facilities;
• Off site play facilities;
Page 68 of 80

Page 69

• The provision of 30 affordable dwellings within Site h36 (North
Gorebridge) to meet the requirement arising from both sites; and
• The transfer of land for a primary school within allocated site h36.    
8.44 Since the lapse of the 2011 planning permission the MLDP has been
adopted and it states at paragraph 3.2.6 that “The MLDP affordable
housing requirement supersedes previous Local Plan provisions for
affordable housing; for the avoidance of doubt, the 25% affordable
housing requirement will apply to all housing sites allocated in previous
Local Plans that do not have an extant planning consent”. As such
additional affordable housing will be required – at the time of granting
the previous permission the requirement was a 5% -10% affordable
housing provision.  24 affordable housing units are being proposed. 
8.45 Despite the earlier agreement, if the Council is minded to grant
planning permission for the development it will be necessary for the
applicant to enter into a new planning obligation to secure: 
• A financial contribution towards additional primary education
capacity;
• A financial contribution towards additional secondary education
capacity;
• A financial contribution towards Boarders Rail,
• A financial contribution towards Gorebridge Town Centre;
• A financial contribution towards open space maintenance; and
• The provision of affordable housing (25%). 
8.46 Scottish Government advice on the use of Section 75 Planning
Agreements is set out in Circular 03/2012: Planning Obligations and
Good Neighbour Agreements. The circular advises that planning
obligations should only be sought where they meet all of the following
tests:
• necessary to make the proposed development acceptable in
planning terms (paragraph 15);
• serve a planning purpose (paragraph 16) and, where it is possible
to identify infrastructure provision requirements in advance, should
relate to development plans;
• relate to the proposed development either as a direct consequence
of the development or arising from the cumulative impact of
development in the area (paragraphs 17-19); 
• fairly and reasonably relate in scale and kind to the proposed
development (paragraphs 20-23); and 
• be reasonable in all other respects. 
8.47 The requirements as set out above for any proposed planning
obligation would meet the above tests.         
Page 69 of 80

Page 70

Other Matters 
8.48 Regarding matters raised by representors and consultees and not
already addressed in this report:
• The technical documentations submitted to the application have
been reviewed by the relevant consultees, and whilst some of
these are dated, they have been considered fit for purpose and no
objections have been raised from consultees on this basis; and 
• Comments raise concern that the applicant advised that an
emergency access route is available adjacent to the Arniston
Rangers football ground - this has not been raised as a concern by
the Council’s Policy and Road Safety Manager. 
8.49 The following matters raised in the representations are not material
considerations in the determination of the application:
• The development would spoil a rural outlook; and
• The equipped play area would attract anti-social behaviour. 
9 RECOMMENDATION 
9.1 It is recommended that planning permission be granted or the following
reason:  
The proposed development site is allocated for housing in the
Midlothian Local Development Plan 2017. The proposed detailed
scheme of development in terms of its layout, form, design and
landscape framework is acceptable and as such accords with
development plan policies, subject to securing developer contributions.
The presumption for development is not outweighed by any other
material considerations. 
Subject to: 
a. the prior signing of a planning obligation to secure:
• A financial contribution towards additional primary education
capacity;
• A financial contribution towards additional secondary education
capacity;
• A financial contribution towards Boarders Rail,
• A financial contribution towards Gorebridge Town Centre;
• A financial contribution towards open space maintenance; and
• The provision of affordable housing (25%). 
The legal agreement shall be concluded within six months. If the
agreement is not concluded timeously the application will be refused. 
b. SEPA withdrawing their holding objection. 
c. the following conditions:
Page 70 of 80

Page 71

1. The development to which this permission relates shall commence
not later than the expiration of three years beginning with the date
of this permission. 
Reason: To accord with the provisions of Section 58 of the Town
and Country Planning (Scotland) Act 1997 (as amended by the
Planning (Scotland) Act 2019). 
2. Development shall not begin until details and, if requested, samples
of materials to be used on external surfaces of the buildings; hard
ground cover surfaces; means of enclosure and ancillary structures
have been submitted to and approved in writing by the planning
authority. Development shall thereafter be carried out using the
approved materials or such alternatives as may be agreed in writing
with the planning authority. 
Reason: In the interest of protecting the character and appearance
of the area so as to comply with policies DEV2 of the Midlothian
Local Development Plan 2017. 
3. Development shall not begin until details of the phasing of the
development has been submitted to and approved in writing by the
planning authority. The phasing schedule shall include the
construction of each residential phase of the development, the
provision of affordable housing, the provision of open space,
children’s play provision, structural landscaping, the SUDS
provision and transportation/roads infrastructure. Development shall
thereafter be carried out in accordance with the approved phasing
unless agreed in writing with the planning authority. 
Reason: To ensure the development is implemented in a manner
which mitigates the impact of the development process on existing
land users and the future occupants of the development. 
4. Notwithstanding that delineated on application drawing the
development shall not begin until details of a revised scheme of
hard and soft landscaping has been submitted to and approved in
writing by the planning authority. Details of the scheme shall
include: 
i. other than existing and finished ground levels and floor
levels for all buildings, open space and roads in relation to
a fixed datum;
ii. existing trees, landscaping features and vegetation;
including hedges, to be retained; removed, protected
during development and in the case of damage, restored; 
iii. proposed new planting in communal areas, road verges
and open space, including trees, shrubs, hedging,
wildflowers and grassed areas; 
Page 71 of 80

Page 72

iv. location and design of any proposed walls, fences and
gates,  including those surrounding bin stores or any other
ancillary structures;
v. schedule of plants to comprise species, plant sizes and
proposed numbers/density; 
vi. programme for completion and subsequent maintenance
of all soft and hard landscaping;
vii. drainage details, watercourse diversions, flood prevention
measures and sustainable urban drainage systems to
manage water runoff; 
viii. proposed car park configuration and surfacing;
ix. proposed footpaths and cycle paths (designed to be
unsuitable for motor bike use); and,
x. details of existing and proposed services; water, gas,
electric and telephone 
All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as
the programme for completion and subsequent maintenance (vi). 
Any trees or shrubs removed, dying, becoming seriously diseased
or damaged within five years of planting shall be replaced in the
following planting season by trees/shrubs of a similar species to
those originally required. 
Reason: To ensure the quality of the development is enhanced by
landscaping to reflect its setting in accordance with policies DEV2,
DEV6 and DEV7 of the Midlothian Local Development Plan 2017
and national planning guidance and advice. 
5. Development shall not begin until details of the site access, roads,
footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority.
Details of the scheme shall include: 
i. existing and finished ground levels for all roads and cycle
ways in relation to a fixed datum;
ii. proposed vehicular, cycle and pedestrian access; 
iii. proposed roads (including turning facilities), footpaths and
cycle ways;
iv. proposed visibility splays, traffic calming measures,
lighting and signage; 
v. a green transport plan designed to minimise the use of
private transport and to promote walking, cycling, safe
routes to school and the use of public transport:
vi. proposed car parking arrangements; and 
vii. a programme for completion for the construction of
access, roads, footpaths and cycle paths. 
Page 72 of 80

Page 73

Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be agreed in writing
with the planning authority. 
Reason: To ensure the future users of the buildings, existing local
residents and those visiting the development site during the
construction process have safe and convenient access to and from
the site. 
6. Development shall not begin until details, including a timetable of
implementation, of 'Percent for Art' have been submitted to and
approved in writing by the planning authority. The 'Percent for Art'
shall be implemented as per the approved details. 
Reason: To ensure the quality of the development is enhanced by
the use of art to reflect its setting in accordance with policies of the
Midlothian Local Development Plan 2017 and national planning
guidance and advice. 
7. Prior to the commencement of development details of a suitable
trespass proof fence of at least 1.8 metres in height adjacent to
Network Rail’s boundary and provision for the fence’s future
maintenance and renewal shall be prepared and submitted to the
planning authority for approval in writing. Thereafter development
shall accord with approved details. 
8. Prior to the commencement of development a construction method
statement, which includes plant details, locations and lifting plans,
shall be prepared and submitted to the Planning Authority for
approval and agreed in conjunction with Network Rail’s Asset
Protection Engineers. 
Reasons for conditions 6 and 7: To ensure safeguarding of
Borders Rail infrastructure. 
9. Development shall not begin until details, including a timetable of
implementation, of ultrafast fibre broadband have been submitted
to and approved in writing by the planning authority. The details
shall include delivery of ultrafast speed fibre broadband prior to the
occupation of each dwelling. The delivery of high speed fibre
broadband shall be implemented as per the approved details. 
Reason: To ensure the quality of the development is enhanced by
the provision of appropriate digital infrastructure. 
10. Development shall not begin until details of a
sustainability/biodiversity scheme for the site, including the
provision of house bricks and boxes for bats and swifts throughout
the development, as well as mammal passage points in walls and
fences, has been submitted to and approved in writing by the
Page 73 of 80

Page 74

planning authority. The scheme shall include the recommendations
set out within section 8 of the submitted Preliminary Ecological
Appraisal (PEA) dated 16.06.2022 and prepared by Envirocentre.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be approved in writing
with the planning authority. 
Reason: To ensure the development accords with the
requirements of policy ENV 15 of the Proposed Midlothian Local
Development Plan 2017. 
11. Notwithstanding the docketed report Mason Evans Report on Plot 3
Gorebridge – Report on Site Investigations, Persimmon Homes
(East) Scotland Ltd dated March 2007 ref 2006/42. No
development shall take place until an updated Report on Site
Investigations is prepared and submitted to the planning authority
for approval in writing. The updated report shall include a fully
informed desk study review and shall address/include: 
i. All relevant appendices referred to within the Report on
Site Investigations, Persimmon Homes (East) Scotland Ltd
dated March 2007 ref 2006/42;
ii. Commentary on potential mine workings and ground gas
risks
iii. Assessment of Radon Gas levels;
iv. Additional justification for limited number (9 in total) of soil
samples with associated commentary on likely impact on
human health;
v. Updated commentary on human health, water environment
and ground gas risk assessments;
vi. water supply pipe risk assessment which shall be
consulted on with Scottish Water; and
vii. Recommendation for any further required remediation
works necessary based on the findings of this updated
report. 
Reason: To ensure that all potential sources of contamination have
been thoroughly assessed against up-to-date guidance and to
secure appropriate remediation. 
12. On completion of the decontamination/remediation works referred
to in Condition 11 above and prior to any dwellinghouse being
occupied, a validation report or reports shall be submitted to the
planning authority confirming that the works have been carried out
in accordance with the approved scheme. No dwellinghouse shall
be occupied unless or until the planning authority have approved
the required validation. 
Reason: To ensure compliance with policy ENV16 of the MLDP
2017.
Page 74 of 80

Page 75

13. Development shall not begin until details of a scheme to deal with
surface water drainage has been submitted to and approved in
writing by the planning authority. This shall include an updated
cross section through the proposed SUDS pond which shows water
levels and 1:200 year + climate change flooding level.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be approved in writing
with the planning authority. 
Reason: To ensure that the development is provided with
adequate surface water drainage; and to ensure that development
complies with policies ENV9 and ENV10 of the Midlothian Local
Development Plan 2017. 
14. Construction on site shall be limited to the following hours:
• Monday to Friday - 8am – 7pm
• Saturday - 8am – 1pm
• Sunday - No working 
Reason: To preserve the amenity of the residential environment in
accordance with policy DEV 2 of the Proposed Midlothian Local
Development Plan 2017. 
15. Development shall not begin until a Construction Environment
Management Plan (CEMP) has been submitted to and approved in
writing by the planning authority. The CEMP shall include: 
i. Details of construction access routes;
ii. signage for construction traffic, pedestrians and other users
of the site;
iii. controls on the arrival and departure times for construction
vehicles, delivery vehicles and for site workers (to avoid
school arrival/departure times);
iv. details of piling methods (if employed); 
v. details of any earthworks; 
vi. control of emissions strategy; 
vii. a dust management plan strategy; 
viii. waste management and disposal of material strategy; 
ix. a community liaison representative will be identified to deal
with the provision of information on the development to the
local community and to deal with any complaints regarding
construction on the site;
x. prevention of mud/debris being deposited on the public
highway;
xi. material and hazardous material storage and removal; and
xii. controls on construction, engineering or any other
operations or the delivery of plant, machinery and materials
(to take place between 0800 to 1900hrs Monday to Friday
and 0800 to 1300hrs on Saturdays).
Page 75 of 80

Page 76

Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be approved in writing
with the planning authority. 
Reason: In order to control the construction activity on the site,
ensure environmental impact during the construction period is
acceptable and to ensure appropriate mitigation is in place. 
16. Development shall not commence until details of the double glazed
window units and the accompanying acoustic trickle ventilation on
properties at plots 9 to 27 to allow for ventilation with closed
windows to achieving satisfactory internal noise levels, is prepared
and submitted to the planning authority for approval in writing.
Thereafter development shall be carried out in accordance with
these approved details. 
17. Correct installation of the double glazed window units and
accompanying acoustic trickle vents agreed by condition 15 shall
be verified after the completion of the dwellings, by an
appropriately qualified Acoustic Consultant and accredited
/chartered member of the Institute of Acoustics or the Association
of Noise Consultants. Verification will compose of a written report. 
Reason: To mitigate noise from the Boarders Railway and thus
allow development to comply with policy ENV 18 of the Proposed
Midlothian Local Development Plan 2017. 
18. Development shall not commence until details are prepared and
provided demonstrating the proposed cycle way / footpath
proceeding to the south west of the site shall connect to the core
path network and route code MID/8-23/1. 
19. Prior to the occupation of the fist dwellinghouse, the cycleway /
footpath and connection referred to in condition 17 shall be
completed and safe to use, unless otherwise agreed in writing with
the planning authority. 
Reasons for conditions 17 and 18: To ensure that appropriate
pedestrian and cycling access is achieved by the development. 
20. Development shall not begin until details of the provision and use
of electric vehicle charging stations throughout the development
have been submitted to and approved in writing by the planning
authority. Development shall thereafter be carried out in
accordance with the approved details or such alternatives as may
be approved in writing with the planning authority. 
Page 76 of 80

Page 77

Reason: To ensure the development accords with the
requirements of policy TRAN5 of the Midlothian Local Development
Plan 2017. 
21. Prior to the first occupation of any of the dwellignhouses on plots 1
and 2, 57 – 64 and 94 – 96 an equipped neighbourhood children’s
play area and shall be formed/constructed on the central open
space (fronted by plots 1 and 2) and made available for use in
accordance with detailed drawings and a written specification to be
submitted to and approved in advance by the planning authority.
There shall be no variation therefrom unless with the prior written
approval of the planning authority. 
Reason: To ensure the timeous provision of an acceptable quantity
and quality of equipped children's play in the development in the
interests of the residential amenity of the future occupants of the
houses and flats. 
22. Notwithstanding the docketed Site Layout (ref: 02-01-NEW rev AB)
a schedule of improved quality materials for the identified area of
improved quality shall be prepared and submitted to for approval by
the planning authority. Samples shall be provided. Thereafter
development shall accord with these approved samples. 
Reason: In the interest of protecting the character and appearance
of the area so as to comply with policies DEV2 and DEV6 of the
Midlothian Local Development Plan 2017. 
23. Any retaining walls in excess of 1.2m in height shall be crib lock
wall or other similar product that allows planting within the walling.
Details, including sections, of such retaining walls shall be
prepared and submitted to the planning authority for approval in
writing. This shall take place prior to the implementation of any
such retention features. Development shall thereafter be in
accordance with approved details. 
Reason: To reduce the impact on amenity resulting from retaining
walls, and to ensure compliance with policy DEV 2 and 6 of the
Proposed Midlothian Local Development Plan 2017. 
Page 77 of 80

Page 78

Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:     30 September 2022 
Application No:    22/00066/DPP
Applicant: Persimmon Homes
Agent:              N/A
Validation Date:  9 February 2022
Contact Person:  Hugh Shepherd 
Email:    hugh.shepherd@midlothian.gov.uk
Background Papers: 07/00351/FUL, 13/00609/PAC, and 17/00435/DPP 
Page 78 of 80

Page 79

File No.
1:2,500Scale:
Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. 100023416 (2018) ±
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Education, Economy
& Communities Erection of 96 dwellings and associated works
Newbyres Site B, River Gore Road, Gorebridge
22/00066/DPP
Page 79 of 80

Page 80

OPPTF-1481d(19)
Warriston [V7]
Crammond TF-1146d(19) OPP
[V7]
KIRKHILL COURT
14
26
1
RIVER GORE VIEW
RIVER GORE GROVE
Cottages
7
Footpath
Footpath
1
8
3
6
1
4
4
2
19
POTENTIAL
3M WIDE LINK
FOOTPATH
3M WIDE LINK
FOOTPATH
STRUCTURED PLANTING BY NETWORK RAIL
STRUCTURED PLANTING BY NETWORK RAIL
OPEN
SPACE
OPPTF-1247d(19)
Thornton [V7]
TF-1033d(19)OPP
Leith [V7] TF-1217d(19)AS
Balerno
[V7]
ThursoTF-1233d(19)AS
[V7]
OPP
TF-1407d(19)
Whithorn[V7]
TF-1217d(19)
AS
Balerno
[V7]
AS
TF-1407d(19)
Whithorn[V7]
Thurso TF-1233d(19) AS
[V7]
OPEN
SPACE
AS
TF-1247d(19)
Thornton
[V7]
AS
TF-1653d(19)
Stockbridge [V7]
OPP
TF-1653d(19)
Stockbridge [V7]
AS TF-1653d(19)
Stockbridge[V7]
OPP TF-1407d(19)
Whithorn[V7]
OPP
TF-1407d(19)
Whithorn[V7]
Thurso TF-1233d(19) OPP
[V7]
ThursoTF-1233d(19)AS [V7]
CrammondTF-1146d(19)AS
[V7]
SEWAGE TREATMENT
WORKS BEING
RELOCATED
Footpath link subject to SW
agreement
OPP
TF-0613mt(19)
Portree
AS
TF-0613mt(19)
Portree
AS
TF-0799et(19)
Newmore
OPP
TF-0799et(19)
Newmore
[V7]
[V7]
[V7]
[V7] AS
TF-0613mt(19)
Portree
[V7]
TF-1217d(19)
AS Balerno[V7]
TF-1033d(19)OPP
Leith [V7]
TF-1033d(19)AS
Leith [V7]
OPPTF-1481d(19)
Warriston [V7]
OPP TF-0613mt(19)
Portree
AS TF-0613mt(19)
Portree
AS TF-0799et(19)
Newmore
OPP TF-0799et(19)
Newmore
[V7]
[V7]
[V7]
[V7]
OPP
TF-0613mt(19)
Portree
ASTF-0613mt(19)
Portree
ASTF-0799et(19)
Newmore
OPPTF-0799et(19)
Newmore
[V7]
[V7]
[V7]
[V7]
AS TF-0613mt(19)
PortreeAS TF-0799et(19)
Newmore
OPP TF-0799et(19)
Newmore[V7]
[V7]
[V7]
AS
TF-1407d(19)
Whithorn[V7]
OPPTF-1247d(19)
Thornton [V7]
TF-1217d(19)
OPP
Balerno [V7]
OPPTF-1407d(19)
Whithorn [V7]
TF-1033d(19)
OPP
Leith [V7]
Substation Switching
Station
Threave
Opp [V7]
Threave
As [V7]
Braemar
As [V7]
Braemar
Opp [V7]
ThreaveOpp [V7]
ThreaveAs [V7] BraemarAs [V7]
BraemarOpp [V7]
ThreaveOpp [V7]
ThreaveAs [V7] BraemarAs [V7]
BraemarOpp [V7]
TF-1033d(19) OPP
Leith[V7]
AS
TF-0931d(19)
Kearn[V7]
TF-1033d(19)OPP
Leith [V7]
OPP
TF-1407d(19)
Whithorn[V7]
AS
TF-0931d(19)
Kearn[V7]
ThreaveOpp [V7]
ThreaveAs [V7] BraemarAs [V7]
BraemarOpp [V7]
Threave Opp [V7]
Threave As [V7]Braemar As [V7]
Braemar Opp [V7]
OPP TF-1212d(19)
Ettrick[V7]
Thurso
TF-1233d(19)
AS
[V7]
DSG2
AS
TF-1247d(19)
Thornton
[V7]
OPP
TF-1481d(19)
Warriston[V7]
OPP
TF-1407d(19)
Whithorn[V7]
AS
TF-1481d(19)
Warriston[V7]
AS
TF-1407d(19)
Whithorn[V7]
TF-1217d(19) OPP
Balerno[V7]
TF-1217d(19) OPP
Balerno[V7]
AS
TF-0931d(19)
Kearn[V7]
AS
TF-1247d(19)
Thornton
[V7]
Threave Opp [V7]
Threave As [V7]Braemar As [V7]
Braemar Opp [V7]
TF-1033d(19)
AS Leith
[V7]
Crammond TF-1146d(19) OPP
[V7]
Crammond
TF-1146d(19)
OPP[V7]
AS TF-1212d(19)
Ettrick[V7]
OPP
TF-1212d(19)
Ettrick
[V7]
Thurso
TF-1233d(19)
AS
[V7]
Thurso
TF-1233d(19)
AS
[V7]
ASTF-1407d(19)
Whithorn [V7]
TF-1033d(19) AS
Leith[V7]
TF-1217d(19) OPP
Balerno
[V7]
EV
EV
EV
TF-1217d(19) OPP
Balerno[V7] AS
TF-1247d(19)
Thornton
[V7]
*
*
* *
*
*
*
*
*
*
*
*
**
*
*
*
* *
*
SUDS
POND
Pumping
Station
1.
2.
3.
4.
5. 6. 7. 8.
18.19.21.
22.
23.24.25.
26.
27.
28.
29.
30.
31.
33.
34.
35.
36.
37.38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48. 49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88. 89. 90. 91. 92.
93.
94.
95.
96.
9.10.11.12.13.14.15.16.
17.
32.
73.
74.
75.
76.
77.
20.
3.5m SEPA STANDOFF HIGHLIGHTED IN FRA FOR DRAIN 1
BOTTOM OF BANK LINE
BOTTOM OF BANK LINE
NORTH
g
Driveway to be grey monoblock
with 900mm slabbed path where
indicated
Tar 2m Footpath
Road links to be asphalt with white
chip.
Entrance junction, parking courts
and shared surfaces to be brindle
paviors
Doors/Windows
Front doors to be steel painted black.
Rear/side doors to be steel painted black.
Garage doors to be steel painted black.
Windows to be white uPVC.
Fascias to be white uPVC.
RWP's to be black uPVC.
All landscaping shown reflects the proposed scheme
at the time of print. All prospective buyers are to refer
to the current Landscape Layout for full details.
All front gardens to be turfed.
Paths to single dwelling to be 1.0m clear.
Pathways to communal areas to be 1.2m clear.
Pavements to be 2m wide unless otherwise stated (ie
cylceways)
All houses on this site will be built in timber frame and to
'V5' specification. Refer to site specific drawing issue
register for relevant drawings.
F18
F21
F18
Adopted roads to be asphalt with
white chip.
100 20 30 40 50
Scale Bar 1:500
(Metres)
1.8m high brick piers with timber
fencing infill
1.8m high screen fence and gate
1.8m high screen fence (vertical
boarded)
BF3
WT
G
roughcast
elevation treatment
MATERIALS CODING:
Elevational Treatment
BF3 - Full Brick
Roof tiles
A - Seawave Anthracite (Pantile)
T - Seawave Terracotta (Pantile)
Bricks
B - Cussworth Riven
A - Thoresby Riven
Br - Sherborne Riven
roof tile
main brick
feature brick T
Bin stance for houses
KEY
MATERIAL FINISHES
Site Boundary
CONSTRUCTION
Plot number
Area Of Improved Quality 20%
1
Enhanced Gable Windows
Indicates enhanced planting to
slopes within client gardens
*
ACCOMMODATION SCHEDULE
House Type Notes Code No
Portree 2 bed. terr. 613t 8
Newmore 3 bed. terr. 799t 8
Kearn 3 bed. det. 931d 3
Leith 4 bed. det. 1033d 8
Crammond 4 bed. det. 1146d 4
Ettrick 4 bed. det. 1212d 3
Balerno 4 bed. det 1217d 8
Thurso 4 bed. det. 1233d 7
Thornton 4 bed. det. 1247d 6
Whithorn 4 bed. det. 1407d 10
Warriston 5 bed. det 1481d 4
Stockbridge 5 bed. det 1653d 3 
Total PD Units 72
Braemar 2 bed. terr. 834 12
Threave 3 bed. terr. 953 12
Total HA Units 24
TOTAL UNITS 96
Denotes housing association
plots.
BATHGATE • EH48 2TQ
WESTER INCH BUSINESS PARK
PERSIMMON HOMES
TEL 01506 638300
EAST SCOTLAND LTD
OLD WELL COURT
UNIT 1
FAX 01506 638301
I CERTIFY THAT THIS IS THE ORIGINAL/A TRUE
COPY OF THE DRAWING AS REFERRED TO IN
OUR APPLICATION FOR BUILDING WARRANT.
SIGNED ON BEHALF OF
PERSIMMON HOMES (SCOTLAND) LTD
SIGN & DATE :
River Gore View
Newbyres
Site Layout
- April 16
SO 1/500@A1
02-01-NEW AB
received.
CONSTRAINTS & PLANNING NOTES
1. Garden Sizes to comply with MLC Local Plan
Detached / Semi Detached Dwelling
- 110m² - 3 Bed
- 130m² - 4 - 5 Bed
Rear Elevation (Back to Back) = 25m
Front Elevations (Front to Front) = 22m
Gable to Rear or Front Elevation = 16m
2. Extended Community Greenspace to interlink with
existing residential open space strategy.
3. 44 Visitor Parking Bays (45% Parking Provision)
Public EV charging location. Charger to serve 2 no.
bays (total of 6 EV charging bays on site).
J 25.08.21 JHLayout redesigned entirely following feedback from planning.
K 30.08.21 JHLayout tidied ahead of planning submission. Total unit
numbers reduced from 117 to 104 units.
L 13.09.21 JHDriveways adjusted for plot specific arrangements. Area of
Improved Quality indicated on layout
M 22.09.21 JHUpdated to reflect planning feedback. Total unit numbers
reduced from 104 to 96 units.
N 15.11.21 JHAmended to increase average sq.ft of house types. Back to
back gardens in middle of site amended so that low level
gardens have a planted buffer zone over slope.
O 17.12.21 JHMinor amendments following planning meeting. Units
repositioned to provide frontage to central open space.
Units adjacent SUDS basin moved to provide habitat link to
open space.
Visitor parking bays amended to sit outwith road.
P 10.01.22 JHPlots 33 and 43 amended following issues with drainage run
EV
Q 12.04.22 JHRemix at plots 2 - 5, 19 - 23 and 44 - 48. Visitor parking
locations increased from 15 to 39, including 6 public EV
charging.
R 18.05.22 JHUpdated SUDs feature. Basin swapped for pond, to promote
biodiversity within the site.
S 17.06.22 JHLayout amended following planning comments. Remix of
plots, including repositioning terraces to front open space.
T 04.07.22 JH1 unit removed due to feedback from planning.
U 25.07.22 JHRemixed to include housing association plots. Minor
amendments to improve open space
V 27.07.22 JHFurther remix following planning feedback Minor increase to
open space areas.
W 27.07.22 JHParking bays amended following planning feedback
X 02.08.22 JHPlots 17, 26 - 29, 87, 92 and 93 moved to meeting
separation distance requirements
Y 04.08.22 JHKey added to indicate affordable plots
Z 05.08.22 JHPlots 1 and 2 moved due to levels issue on boundary
AA 18.08.22 GTSubstation and switching station moved to allow for
wayleave distances to plot 60.
AB 16.09.22 AFFootpath stopped up at Plot 9 as requested by Planner.
Cycle Path diverted in South West corner due to levels to
allow tie in with existing footpath link. Plots 44-48
re-arranged to allow garden sizes to comply with new rear
fence line due to SEPA standoff from Drain 1 as noted in
FRA.
Page 80 of 80