Democracy Spraffa

Agenda Document Pack - Planning Committee - 28/11/2023

Midlothian Council · 28 November 2023
Back to Planning Committee — 28 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Planning Committee 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 28 November 2023 
Time:  13:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 108

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of 31 October 2023 submitted for approval 5 - 14 
5          Public Reports
5.1 MLDP2 Engagement - Position Update 15 - 48
5.2 Planning Performance Framework 2022/23 Feedback 49 - 54
5.3 Listed Building Enforcement Appeal Decision regarding
installation of signage, vinyl graphics and change of colour at 118
High Street, Dalkeith (USA Nails)
55 - 68
5.4 Wilful destruction of trees within the Eskbank and Ironmills
Conservation Area and the non-compliance with a Planning
Contravention Notice issued in relation to land adjacent to Old
Golf House, Eskbank, Dalkeith
69 - 76
5.5 23/00657/PAC – Pre-application consultation regarding
remediation works to proposed education campus: including site
remediation, formation of hardstanding, site platforming and
provision of site access, utilities/services and drainage at the site
of the former Monktonhall Colliery, Newton Village, Dalkeith
77 - 82
5.6 23/00662/PAC – Pre-application consultation regarding extension
to existing quarry; retention of processing plant; installation of
ancillary equipment and associated works at Temple Quarry,
Gorebridge
83 - 88
5.7 23/00532/S42 – Amendment to phasing regarding the
redevelopment of the Midlothian Snowsports Centre to enable
construction on site whilst the access is being constructed
89 - 108 
6          Private Reports 
No items for discussion 
Page 2 of 108

Page 3

7          Date of Next Meeting 
The next meeting will be held on Tuesday 23 January 2024 at 13.00pm. 
Page 3 of 108

Page 4

Page 4 of 108

Page 5

Minute of Meeting 
Planning Committee 
Date Time Venue
Tuesday, 31 October 2023 13:00 Council Chambers,
Midlothian House/Hybrid   
Present: 
Councillor Imrie (Chair) Councillor McEwan
Councillor McCall (Attended virtually) Councillor McManus
Councillor Parry (Attended virtually) Councillor Winchester (Attended
virtually)
Councillor Smaill Councillor Virgo
Councillor Alexander Councillor McKenzie (Attended virtually)
Councillor Pottinger Councillor Russell
Councillor Cassidy Councillor Curran
Councillor Scott Councillor Bowen 
In Attendance: 
Kevin Anderson Executive Director Place
Derek Oliver Chief Officer Place
Peter Arnsdorf Planning, Sustainable Growth and Investment Manager
Alan Turpie Legal Services Manager
Morag Barrow Director of Health & Social Care: Midlothian HSCP /
Chief Officer to Midlothian IJB (Attended virtually)
Lucy Roddie Democratic Services Officer
Janet Ritchie Democratic Services Officer 
Planning Committee
Tuesday 28 November 2023
Item No 4.1
Page 5 of 108

Page 6

1. Apologies
Apologies for absence were received on behalf of Councillor Drummond and
Councillor Milligan. 
2. Order of Business
The order of business was as set out in the Agenda.
3. Declarations of interest 
Councillor McManus declared an interest in Item 5.6 and would leave the meeting
during the discussion.
Councillor Parry made a declaration of transparency for Item 5.6 and noted that
during the pre-planning process she had met with the applicant but had not
expressed a view. Councillor Parry had also been contacted by objectors but no
view had been expressed that would prejudice her involvement in discussions.
Councillor Winchester made a declaration of transparency for Item 5.6 and noted
that she had been approached by both applicant and objectors. 
4. Minutes of Previous Meetings 
The minute of the meeting of 12 September 2023 was submitted and approved
as a correct record. 
5. Reports 
Agenda No Report Title Submitted by:
5.1 MLDP Engagement/Elected Member
Workshops and MLDP2 Timetable
Chief Officer, Place
Outline of Report and Summary of Discussion
Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report. The purpose of the report is to set out the dates for the upcoming elected
member workshops on the Midlothian Local Development Plan 2 (MLDP2) and to
provide an updated MLDP2 timetable. 
Since the Committee considered a report on NPF4 and a review of its local plan at
its meeting in February 2023, Officers have undertaken widespread engagement with
interested parties including formally inviting local communities to prepare local place
plans, meeting key agencies and developers, holding drop-in sessions for local
residents and holding workshops with elected members. The November set of
workshops are being held at 2.00pm on 14 November 2023 for Midlothian West,
Midlothian South and Penicuik Ward elected members and 2.00pm on 22 November
2023 for Dalkeith, Midlothian East and Bonnyrigg Ward elected members. Elected
Page 6 of 108

Page 7

members can also expect further workshops in 2024 and 2025 as MLDP2 progresses
to the plan preparation stage. 
It is recommended that the Committee note the details of the November elected
member workshops and the updated indicative timescale for the production of
MLDP2. 
Councillor Imrie, the Chair, thanked Mr Arnsdorf for the report and opened it up to
questions. 
Councillor Smaill asked if Councillors were permitted to have open conversations
with all parties about the progress of the development plan. Mr Arnsdorf confirmed
that Elected Members were encouraged to have open discussions within their local
communities about the development plan at this stage. 
Councillor Smaill raised a concern that the Council was in discussions with
developers about securing additional sites, yet construction of many of the houses
predicted 5 years ago remains outstanding. Mr Arnsdorf responded that although
conversations with potential stakeholders were ongoing, no commitments had been
made and reassured the committee that decisions will be for Elected Members to
take. The Chair referred to Items 6, 7 and 8 of the timetable within the report and
noted that Elected Members would have full opportunity to make their views known. 
Councillor Smaill noted that there may be a conflict with the Standards Commission’s
view that Councillors are permitted to discuss any planning issues at any time. The
Chair agreed with this comment. 
The Chair noted that Elected Members are now able to comment on applications
coming to the Planning Committee in advance of the committee.  
Decision
The Planning Committee agreed to note the details of the November elected member
workshops and the updated indicative timescale for the production of MLDP2.
Action
All 
Agenda No Report Title Submitted by:
5.2 2023 Housing Land Audit – 908 units built in
2022/23
Chief Officer, Place
Outline of Report and Summary of Discussion
Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report. The purpose of the report is to present the 2023 Housing Land Audit (HLA)
and to update the Committee on the state of the housing land supply in Midlothian. 
Page 7 of 108

Page 8

Mr Arnsdorf summarised the report. It is recommended that the Committee note the
2023 Housing Land Audit for Midlothian and agree to its publication. 
The Chair thanked Mr Arnsdorf for the report and opened it up to questions. 
Councillor Scott noted that figures for Mayfield and Newtongrange were combined
and asked if they could be separated as they are two separate wards. Mr Arnsdorf
agreed to review this for the next local plan. 
Councillor Pottinger commented on the importance of working in partnership with
service providers to accommodate development and subsequent population growth
and asked if there were any consultation regulations in place. Mr Arnsdorf
commented that the audit was intended to make relevant bodies aware of build
programmes and promote forward planning. Key agency meetings are held regularly
to facilitate engagement and consultation. 
Councillor Curran commented on the importance of ensuring appropriate
infrastructure and services are in place to support development and subsequent
population growth. Mr Arnsdorf commented that the Council was focused on
proactive engagement with relevant bodies. The Chair reported that the planning
directorate within Scottish Government are developing infrastructure first guidance.
Councillor Alexander queried whether houses being built at the moment will be fit for
purpose in the future, and suggested that there should be measures in place to
prevent the need to retrofit. In response, the Chair commented that new housing
stock will be required to meet certain standards. Retrofitting older housing stock is
the challenge. 
Councillor Virgo sought clarity on the figures cited in the report which suggest the
target number of houses is lower than demand. In response, Mr Arnsdorf
acknowledged that a range of variables made predictions challenging. 
Councillor McEwan asked if any legal clauses are included within contracts to
safeguard against late delivery of developments. Mr Arnsdorf reported that since the
introduction of MPF4, the Council is required to allocate sufficient land to deliver
housing. The Council is not penalised if the target is not met as long as sufficient land
has been allocated. Councillor McEwan asked if the Council is compensated for late
delivery of developments. Alan Turpie, Legal Services Manager, confirmed that no
contractual obligations exist between the Council as a planning authority and private
sector developers.
Decision
The Planning Committee noted the 2023 Housing Land Audit for Midlothian and
agree to its publication.
Action
The Planning, Sustainable Growth and Investment Manager 
Page 8 of 108

Page 9

Agenda No Report Title Submitted by:
5.3 Siting of unauthorised advertisement on land
adjacent A68 and A720 City Bypass
Chief Officer, Place
Outline of Report and Summary of Discussion
Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report. The report relates to the display of an unauthorised hoarding
advertisement on land adjoining the A68/A720 (on) slip road. 
At its meeting of 12 September 2023 the Committee determined to instruct the
Planning, Sustainable Growth and Investment Manager to refer the case to the
COPFS for consideration of prosecutorial action pursuant to Section 186 of the Town
and Country Planning (Scotland) Act 1997 as amended. Following the Committee
meeting the unauthorised advertisement was removed and as a consequence the
breach of planning control has been resolved, yet the Committee instruction remains
and as such it is appropriate to seek the Committee’s authority to no longer take
prosecutorial action unless the advertisement returns to the site. 
It is recommended that the Committee determine to instruct the Planning,
Sustainable Growth and Investment Manager to no longer refer the case to the
Crown Office and Procurator Fiscal Service for consideration of prosecutorial action
as originally instructed by Committee at its meeting of 12 September 2023. 
The Chair thanked Mr Arnsdorf for the report and opened it up to questions. 
Councillor Virgo moved to instruct the Planning, Sustainable Growth and Investment
Manager to no longer refer the case to the Crown Office and Procurator Fiscal
Service for consideration of prosecutorial action as original instructed by Committee
at its meeting of 12 September 2023. Seconded by Councillor Smaill. 
Decision
The Planning Committee agreed to instruct the Planning, Sustainable Growth and
Investment Manager to no longer refer the case to the Crown Office and Procurator
Fiscal Service for consideration of prosecutorial action as originally instructed by
Committee at its meeting of 12 September 2023.
Action
The Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.4 23/00465/S42 – Amendment to conditions
associated with the access arrangements at
land at Calderstones, Biggar Road, Hillend
Chief Officer, Place
Outline of Report and Summary of Discussion
Page 9 of 108

Page 10

Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report. The report is a Section 42 application to amend planning conditions 9, 10
and 12 imposed on a grant of planning permission approved by the Committee at its
meeting of 9 June 2020. The planning permission in principle is for the demolition of
existing dwellinghouses, erection of hotel, erection of replacement house plot,
formation of three house plots, formation of access roads, car parking and associated
works at land at Calderstones, Biggar road, Hillend. Mr Arnsdorf reported that a
Section 42 application is in itself a planning application which will supersede the
original if implemented. Mr Arnsdorf noted that no representations had been
received. 
It is recommended that the Committee grant planning permission subject to the
conditions as set out in the report. 
The Chair thanked Mr Arnsdorf for the report and opened it up to questions. 
Councillor Cassidy moved to grant planning permission subject to the conditions as
set out in the report, seconded by Councillor Virgo. 
Decision
The Planning Committee approved the planning permission subject to the
conditions as set out in the report.
Action
The Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.5 23/00521/S42 – Amendment to condition related
to the temporary storage of soils at Site F,
Shawfair
Chief Officer, Place
Outline of Report and Summary of Discussion
Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report. The report is a Section 42 application to amend condition 1 imposed on a
grant of planning permission for the storage of soil at Shawfair site F, Monktonhall
Colliery road, Dalkeith, approved by the Committee at its meeting of 9 October 2018.
The current application seeks to amend condition 1, which restricts the use to a
temporary period of 5 years, in order to allow the storage use to continue for a further
5 years. Mr Arnsdorf noted that no representations had been received. 
It is recommended that the Committee grant planning permission subject to the
conditions as set out in the report. 
The Chair thanked Mr Arnsdorf for the report and opened it up to questions. 
Page 10 of 108

Page 11

Councillor Scott asked if the Council has a mechanism for ensuring the soil is cared
for and stored appropriately. In response, Mr Arnsdorf reported that developers are
seeking to retain the soil on site in order to manage it appropriately and enable its re-
use within the site. 
Councillor Smaill moved to grant planning permission subject to the conditions as set
out in the report, seconded by Councillor Virgo. 
Decision
The Planning Committee approved the planning permission subject to the
conditions as set out in the report.
Action
The Planning, Sustainable Growth and Investment Manager 
Councillor McManus and Kevin Anderson left the Chamber at 13.43. 
Agenda No Report Title Submitted by:
5.6 23/00289/DPP – Erection of care home and
retail unit at land at Greenlaw Mains,
Mauricewood Road, Penicuik
Chief Officer, Place
Outline of Report and Summary of Discussion
Given his declaration of interest, Councillor McManus left the Planning Committee
meeting for this Item. 
Peter Arnsdorf, Planning, Sustainable Growth and Investment Manager, introduced
the report as an application for planning permission (23/00289/DPP) for the erection
of a care home with ancillary accommodation and erection of retail unit; formation of
car parking, landscaping; and associated works at land at Greenlaw Mains,
Mauricewood road, Penicuik. Mr Arnsdorf noted that 71 representations had been
received. 
It is recommended that the Committee grants planning permission subject to the
conditions as set out in the report. 
The Chair thanked Mr Arnsdorf for the report and opened it up to questions. 
In relation to a representation within the report commenting that the submissions
were inaccurate and misleading, Peter Arnsdorf confirmed no inaccuracies had been
identified. Mr Arnsdorf explained that modifications were made throughout the
planning process and so it was possible that misunderstandings may arise. The Chair
noted that he had called-in this application for Committee decision due to the
significant number of objections received. The Chair commented that it was his view
that there were no grounds to object to this application, in planning terms. In
response, Mr Arnsdorf confirmed that the application had been suitably assessed
and deemed acceptable. 
Page 11 of 108

Page 12

Mr Arnsdorf reported that the construction of a care home is compatible with the
requirement for a local centre to provide local facilities, and the development is in
accordance with development plan policies. The care home will have a café, hair
salon, cinema and function room as well as an adjacent single retail unit, which will
be available for the general public to use. It was noted that the care home would
potentially provide accommodation for members of the community who no longer can
live independently in their own home. 
Mr Arnsdorf noted that the proposed building is three storeys high and therefore
larger in scale than some of the surrounding buildings. This had prompted concern
raised by representors but Mr Arnsdorf noted that the height variation would provide
an urban design point of focus. Representors had raised concerns around the 24
hour nature of the operation, but it was noted that the development was relatively
small scale and thus deemed to be low impact. The Committee acknowledged that
the proposed development would place further demand on healthcare services. 
The Chair raised a concern that developers do not always deliver the indicative plan
and this can damage relationships with local residents. 
Councillor Bowen asked if there was demand for places in care homes. Morag
Barrow, Director of Health & Social Care: Midlothian HSCP / Chief Officer to
Midlothian IJB, reported that there is a shortage of care home beds within Midlothian.
Ms Barrow commented that she was supportive of the provision of additional care
home beds, but the risk to health services being able to operate sustainably needs
to be carefully considered. Ms Barrow further noted the significant pressure on health
services within this particular area. 
Councillor Bowen commented that it would be important to ensure that the care home
allows local residents to use its facilities. Mr Arnsdorf reported that this was part of
the applicant’s business model. If deemed necessary by Elected Members, a
condition could be included to safeguard access. 
Councillors Bowen and Pottinger raised a concern around parking and queried
whether the allocation was adequate. In response, Mr Arnsdorf reported that the
allocation had been assessed and deemed appropriate, and noted that additional
visitor parking was available if required. Mr Arnsdorf further noted that public
transport options and active travel connections were available and as such the site
is considered to be in a sustainable location. Councillor McKenzie noted that
deliveries and waste uplift would be required and queried whether there was suitable
ingress and egress for heavy goods vehicles. Mr Arnsdorf reported that access had
been assessed and deemed suitable. 
Councillor McKenzie asked if there had been any previous applications from retailers,
as the representations suggest residents were expecting a collection of retail units. 
Mr Arnsdorf commented that the developer had struggled to secure a collection of
interested retailers. 
Page 12 of 108

Page 13

Councillor Cassidy moved to grant planning permission subject to the conditions as
set out in the report and subject to the addition of a condition to safeguard local
resident access to the amenities within the care home. Seconded by Councillor Virgo. 
Decision
The Planning Committee approved the planning permission subject to the conditions
as set out in the report and subject to the addition of a condition to safeguard access
to care home amenities for local residents. 
Action
The Planning, Sustainable Growth and Investment Manager 
6. Private Reports 
No items for discussion 
7. Date of Next Meeting 
The next meeting will be held on Tuesday 28 November at 1:00pm. 
The meeting terminated at 14:16.
Page 13 of 108

Page 14

Page 14 of 108

Page 15

PLANNING COMMITTEE 
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.1
MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2 - POSITION UPDATE ON
ENGAGEMENT AND KEY ISSUES 
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to present a summary of the evidence
collated (to date) in response to the Midlothian Local Development Plan
2 (MLDP2) engagement programme, which has been ongoing since the
launch of the local development plan review in February 2023.  In
addition, the Committee is requested to start considering an indicative
Local Housing Land Requirement (LHLR).
1.2 The report documents those matters presented to elected members in
the May 2023 and November 2023 workshops and continues the
progression of the MLDP2 as previously reported to Committee at its
meetings of 28 February 2023, 16 May 2023 and 31 October 2023.
2 MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2 - EVIDENCE
GATHERING
2.1 At its meeting of 31 October 2023 the Committee was advised of the
pending November 2023 workshops for elected members - the purpose
of the workshops was to inform elected members of the evidence
gathered to date in the production of the MLDP2 Evidence Reports (the
process of presenting the evidence – there will be a report for each topic
area) and to start considering an indicative LHLR.  
2.2 The Evidence Reports will be submitted to Scottish Ministers in 2024 for
“Gate Check”, as part of the MLDP2 preparation process.  The Gate
Check, is to be undertaken by a Scottish Government Reporter(s) from
the Scottish Government Department of Planning and Environmental
Appeals (DPEA) and will determine if Scottish Ministers consider that
the Council has collected sufficient information/evidence to commence
work on producing a MLDP2 Proposed Plan.
2.3 This report provides a summary of key evidence collated for the
Evidence Reports and details the topic headings that are being used to
structure the individual Evidence Reports.  The summary of key
evidence collected to date is set out in Appendix A and a draft schedule
of Evidence Reports being produced by officers for submission to
Scottish Ministers in 2024 is set out in Appendix B.  As set out in the 31
Page 15 of 108

Page 16

October 2023 Committee report, widespread engagement has and
continues to take place to help inform the production of the Evidence
Reports.  Officers have, and will continue to, undertake targeted
engagement on the Evidence Reports prior to their submission to
Scottish Ministers. 
2.4 Where there is a dispute in evidence between the Council and another
party, the Council will seek to resolve it.  Where the dispute cannot be
resolved, the Council will highlight this in the relevant Evidence Report
as an unresolved dispute for the attention of the Scottish Government
Reporter(s) conducting the ”Gate Check” process. 
2.5 The report to Committee at its meeting of 31 October 2023 set the target
of presenting the Evidence Report submission to Council at its
scheduled meeting of 26 March 2024. 
3 LOCAL HOUSING LAND REQUIREMENT (LHLR) FOR MLDP2 
3.1 Midlothian Council in its Evidence Report(s) has to set an indicative
LHLR for MLDP2.  The LHLR is the indicative number of new homes for
which land will be required to be allocated in MLDP2, for the 10 year
period of the plan 2026-2036.  This inclusion of an indicative LHLR in
the Evidence Report(s) is an expectation set out in the May 2023
Scottish Government Local Development Planning Guidance.  This
report identifies the issues that need consideration in this regard.  
3.2 The LHLR should be based upon the Minimum All-Tenure Housing Land
Requirement (MATHLR).  The MATHLR for Midlothian, as explained in
the 28 February 2023 MLDP2 report to Planning Committee, is set out
in National Planning Framework no. 4 (NPF4) at 8,850 homes.  The
expectation in NPF4 is that MLDP2 provides land for a minimum of
8,850 homes. 
3.3 A summary of how the MATHLR figure is derived was provided in
paragraph 2.10 of the 31 October 2023 Housing Land Audit 2023 report
to Committee, and is repeated below for reference: 
“The MATHLR (housing target) is based on 2018 Population and
Housing Estimates from NRS (National Records of Scotland) which
gives a 10 year household projection for Midlothian of 5,950
households.  To this is added the outstanding need identified at 1,114
units (this brings the total to 7,064 units).  To this figure a 25%
generosity allowance is added (1,766 units), bringing the total to 8,830
units – the Scottish Government then rounds this figure to the nearest
50 resulting in a Midlothian MATHLR target of 8,850.” 
3.4 As set out in Committee reports of 28 February 2023 and 31 October
2023, a significant amount of land to meet that requirement is already
allocated in Midlothian through the current MLDP (adopted by the
Council in 2017).  Section 2 of the 31 October 2023 report to Planning
Committee on the Midlothian Housing Land Audit 2023 set out that as at
31 March 2023 the established housing land supply was 11,799 units, of
Page 16 of 108

Page 17

which 11,052 were effective. It also set out that by April 2026 the
Housing Land Audit 2023 projects an effective housing land supply of
8,524, with an additional 600 units from safeguarded sites that could
raise that figure to 9,124 units.  This level of supply is based upon
programmed delivery rates set out in Housing Land Audit 2023.  The
level of supply available at April 2026 will depend upon the rate at which
homes in the audit are built - whether they are built more quickly or
slower than programmed.   
Selecting a Local Housing Land Requirement (LHLR) 
3.5 The expectation of NPF4 is that the MATHLR figure of 8,850 homes will
be exceeded and that the LHLR figure for MLDP2 should be higher than
8,850 homes for the 2026-2036 MLDP2 10 year period.  Scottish
Government expects planning authorities to provide a generous housing
land supply through their local development plans.  It is for the Council
to decide by how much more than the 8,850 MATHLR figure it provides
in its indicative LHLR for MLDP2. 
3.6 NPF4 sets no specific methodology or formula to follow to identify a
LHLR.  It is for the local authority to decide.  The May 2023 Scottish
Government Local Development Planning Guidance sets out sources of
information that planning authorities may wish to consider in identifying
a LHLR.  These include a range of factors including, the MATHLR,
relevant Housing Needs and Demand Assessment (HNDA), the
Council’s Local Housing Strategy (LHS) and Strategic Housing
Investment Plan (SHIP).  Ensuring infrastructure availability (and
delivery), environmental implications, economic considerations and
place-making objectives are, from a general planning perspective,
factors that should also be taken into account in identifying a LHLR. 
3.7 As stated, it is for the Council to determine by how much it exceeds the
MATHLR in identifying a LHLR.  It could choose to minimally exceed the
MATHLR figure by selecting a LHLR figure of perhaps between 8,850
and 9,000 - on the basis of the MATHLR already significantly exceeds,
by approximately 25%, the 2018 NRS (National Records of Scotland)
Population and Housing Estimate of a 10 year household projection
growth for Midlothian of 5,950 and that Midlothian’s actual housing
need, identified in the third Housing Needs and Demand Assessment for
Edinburgh and South East Scotland (HNDA3) is 1,114 households.  The
issues particularly associated with the provision of health care and
education infrastructure highlighted in Appendix A of this report highlight
the impact of the very significant housing growth in Midlothian and
implications for future growth.  Members might consider this supported a
lower exceedance of the 8,850 MATHLR figure. 
3.8 Alternatively, the Council could choose a higher figure of housing land
supply in excess of 8,850 homes, to help provide further housing land
supply generosity to: protect against sites not being delivered; the
supply being built out in advance of the 10 year plan period and as a
consequence unplanned sites being promoted with the risk of planning
Page 17 of 108

Page 18

by appeal for new sites; and to meet the Council’s place-making
objectives such as: 
• An increased provision of affordable housing including the
Council’s own housing programme and aspirations;
• Support for starter homes/first time buyer homes;
• Support for homes for the elderly (bungalows and 4 in a block
properties);
• Support for specialist housing (homes for the disabled and
independent homes with some care provision);
• Housing to support rural populations and economies;
• Identified redevelopment of redundant buildings/sites;
• Promoting economic growth through development;
• Place-making opportunities which benefit local communities; and 
3.9 When elected members are asked to set a LHLR (March 2024) they will
need to take into account the factors identified in this report and the
summary of evidence referred to in Appendix A.  If Members wish to
choose a LHLR that significantly exceeds the MATHLR for Midlothian
then more housing allocations would be needed.  While this report sets
out the significant quantity of housing land supply available, further new
housing land allocations and/or increased housing densities of existing
sites without a planning permission are still likely to be needed to
comfortably exceed the MATHLR, more so if existing allocations are
built more quickly than programmed.  At this stage of evidence
gathering it is not known if sufficient infrastructure could be made readily
available for supporting a LHLR that was significantly more than the
8,850 home MATHLR figure set out in NPF4. 
Risks of a Low Local Housing Land Requirement (LHLR) 
3.10 Members should be aware of possible risks for going for a LHLR (for the
2026-2036 MLDP2) that is minimally above the 8,850 home MATHLR
figure of NPF4.  Policy 16f of NPF4 sets out circumstances where land
not allocated for housing can be brought forward for housing if delivery
of housing sites is happening substantially earlier and quicker than
expected in the Housing Land Audit.  To help maintain a plan-led
system and help avoid the development of unallocated sites for housing,
elected members may choose to have a LHLR sufficiently higher than
the MATHLR – this would result in addition land allocations in MLDP2. 
In addition and/or alternatively where appropriate, housing densities of
already allocated sites that do not have planning consent could
potentially be increased as a means of providing more housing supply. 
3.11 Related to this matter is the completion and using up (or “build out”) of
the current effective housing supply.  Section 2.4 of the Midlothian
Housing Land Audit 2023 (see 31 October 2023 Committee report on
Housing Land Audit 2023) provides details of current and previous
housing completions in Midlothian.  It sets out that in the year
2022/2023 there were 908 housing completions and there were 818
house completions in the year 2021/2022.  Both were record years for
Page 18 of 108

Page 19

the number of housing completions.  For comparison the five year rolling
average from 2017/2018 to 2021/2022 was 656 completions a year.
Future completion levels cannot be known with certainty and are
susceptible to economic and market circumstances.  The Council works
with Homes for Scotland (the umbrella organisation for the house
building industry in Scotland) to, as best it can, set out through the
housing land audit process credible programmed housing completion
information in Midlothian.  It is unknown if the higher than average
completions of the past two years (2021/2022 and 2022/2023) will
continue, or whether they may have been inflated due to a built-up of
demand during the coronavirus pandemic, which has now been capped
by current market conditions. 
3.12 The implication of this for the LHLR and MLDP2 is that if the quicker
than historic levels of completions of the past two years continues the
available effective housing land supply from allocations identified in the
current MLDP (2017) will reduce quicker between now and the adoption
of MLDP2 in late 2026.   Regardless of this position the MLDP2 will still
need to have allocated housing land for a minimum of 8,850 homes. 
3.13 If sufficient allocated housing land were not available in MLDP2 and
quicker rates of completions continued, then a consequence will be that
unallocated housing sites may be brought forward or be granted
planning permission on appeal.  Choosing a LHLR marginally above the
MATHLR will guard against unplanned development and planning by
appeal. 
Local Housing Land Requirement – Possible Scenarios for MLDP2: 
3.14 Below are three possible LHLR scenarios for consideration (elected
members can consider alternative scenarios which may arise from the
continuing engagement programme): 
Option Opportunities Risks
1 8,850 – 9,000 
In line with the
NPF4 MATHLR
target
• Continued growth
within known
infrastructure
constraints;
• Position most reflective
of local communities
and service providers
based on the early
engagement (with the
exception of the house
building industry).
• Dependant on all sites
already allocated for
housing being
delivered;
• Risk of planning by
appeal if the existing
supply is built out
ahead of schedule; and
• Limited opportunities
for the Council to
progress new place-
making objectives.
2 9,001 – 11,000 
Additional
Generosity
• Provides a buffer
against sites not being
delivered and/or the
supply of housing
being built out ahead of
schedule resulting in
• Impact on
infrastructure –
education, health
provision services and
transportation
infrastructure.
Page 19 of 108

Page 20

unallocated housing
sites coming forward;
• Additional employment
and investment
opportunities; and
• Enhanced place-
making opportunities.
3 11,001 + 
Significant
Growth
• Provides a buffer
against sites not being
delivered and/or the
supply of housing
being built out ahead of
schedule resulting in
unallocated housing
sites coming forward;
• Additional employment
and investment
opportunities; and
• Enhanced place-
making opportunities.
• Significant impact on
infrastructure –
education, health
provision services and
transportation
infrastructure. 
4 RECOMMENDATIONS 
4.1 It is recommended that the Committee notes: 
a. the evidence collated to date in response to the Midlothian Local
Development Plan 2 engagement programme; and 
b. the issues set out with regard the indicative Local Housing Land
Requirement (LHLR). 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:   17 November 2023
Contact Person:  Grant Ballantine, Lead Officer Conservation and
Environment
grant.ballantine@midlothian.gov.uk 
Background Papers:  28 February 2023, 16 May 2023 and 31 October
2023 Committee reports with regard NPF4 and
MLDP2.
Appendices:  Appendix A – Summary of Evidence Collected to
Date for MLDP2 Evidence Reports (November 2023)
Appendix B – Draft Schedule of Evidence Reports
being produced for Midlothian Local Development
Plan 2 “Gate Check” – format and structure may be
subject to change 
Page 20 of 108

Page 21

1 
APPENDICES A and B - 28 November 2023 Planning Committee Report: Midlothian Local Development Plan 2 – Position
Update on Engagement and Key Issues
Appendix A – Summary of Evidence Collected to Date for MLDP2 Evidence Reports and Key Issues (November 2023)
Public Engagement Key Issues
The most frequent matters raised during the 2023 public engagement to help inform the production of the draft Evidence Report were very
strong concern on the impact of population and development growth in Midlothian, including:
Topic Public Engagement Comments
Natural Environment • loss of green spaces, trees and the natural environment 
• loss settlement identity and settlement coalescence 
Infrastructure • insufficient education and health care services and capacity not having sufficient capacity to
meet needs of existing and new residents moving into new homes
• the need to ensure sufficient infrastructure in general is in place to support population and
residential growth in Midlothian
• condition of play park facilities
• lack of facilities for younger people 
Housing • affordability of housing and the high prices of new homes being built
• predominance of larger low density detached/semi-detached family housing being built, rather
than a variety of homes and smaller homes (in terms of numbers of bedrooms) being built for
people of lower incomes to get on the housing ladder 
Transport • public transport service (including frequency) and availability of routes to connect different
parts of Midlothian, and the directness of some routes into Edinburgh
• poor condition of roads and impact of new housing
• shortage of safe active travel routes for cycling 
Town Centres/Retail • poor condition of town centres
• people not using local and town centres
• poor car parking provision in town centres
• areas of anti-social behaviour (not limited to local/town centres)
Page 21 of 108

Page 22

2 
Appendix A: Summary of Headline Issues for MLDP2 Evidence Reports: 
Part 1 (Appendix A pages 3-17)
• Climate Change and Biodiversity
• Health
• Education
• Housing and Affordable Housing
• Transport
• Economy
• Developer Contributions
• Town, Local and Commercial Centres and Retail 
Part 2: (Appendix A pages 18-25)
• Natural Places and Landscape
• Built Environment
• Renewable Energy Generation
• Infrastructure (Excluding Health, Education and Roads)
• Blue and Green Infrastructure
• Flood Risk and Water Management 
Page 22 of 108

Page 23

3 
Appendix A - Part 1: Summary of Headline Issues for MLDP2 Evidence Reports 
Evidence Report
Topic/Chapter
Summary of Evidence Collected for MLDP2 Evidence Reports
Climate Change
and Biodiversity
Information is being collected on the Climate Emergency for use in preparation of the Proposed Plan of
MLDP2, and on how to incorporate adaptation to Climate Change in MLDP2. MLDP2 needs to have the
Climate Emergency at its centre. 
The Evidence Report on Climate Mitigation and Adaptation will highlight: 
• National policy context on Climate Mitigation and Adaptation;
• Greenhouse Gas Emissions in Midlothian;
• Climate Change Impacts on Midlothian; 
• Implications for the spatial strategy of MLDP2;
• How can carbon sequestration be achieved; and 
• What does climate adaptation mean for Midlothian and MLDP2. 
With regard to biodiversity, the relevant Evidence Report focusses on the following points and highlights
that they need to inform production of MLDP2: 
• Habitats and Species;
• Local Priorities (for Biodiversity);
• Nature Networks;
• Securing Positive Effects for Biodiversity; and
• Soils. 
Health Health care partners, NHS Lothian Public Health Team and Midlothian’s Health and Social Care
Partnership’s (MHSCP) and NHS Lothian Primary Care have provided information for the Health Evidence
Report. This Appendix A contains only a short summary of the information provided for the Health Evidence
Report. 
Page 23 of 108

Page 24

4 
Implications for Health and Social Care Services and Infrastructure
Significant concern has been expressed by healthcare partners, and the wider public, at the impact on a
range of health care services from new housing growth. Health care partners have acknowledged that the
increase in demand for services is likely to have different impacts on and with Midlothian communities.
Planning officers still engaged with health providers to help determine future investment needs. 
Information indicates service planning challenges due to the uncertainty of the future demographic
composition of new housing (i.e. the ages and number of household occupants) until they presents/ come
forward with service needs. 
Healthcare Staff Retention and Recruitment 
Information on factors effecting staff retention and recruitment is provided. This includes, but not
exclusively, cost of housing, access to transport and public transport, other employment opportunities being
available and the actual availability of people necessary to fill posts. 
Air Quality 
Evidence on air quality in Midlothian is that it is within national quality safety limits. Details have been
provided on where air quality in Midlothian takes place. 
Health and Safety
Development High Risk Area information has been supplied by the Coal Authority and this has been
mapped. The location of high pressure gas pipe lines in Midlothian have also been mapped. 
NPF4 Policy 23(f) requires that development proposals be designed to take into account suicide risk.
Engagement is on going on these matters with NHS Public Health and Emergency Services. This will
inform production of the MLDP2 Proposed Plan. 
Emergency Services
Contact with the Emergency Services (Police, Fire and Ambulance) is on going. The ambulance services
has expressed concern at the population growth in Midlothian and on the response times this may have on
services. 
Page 24 of 108

Page 25

5 
Education Education Capacity
Detailed information on school pupil capacities and potential for school expansions in the Council area is
awaited. Planning officers are engaged with Education services on the matter. Initial indications from
Council Education Services are that the information is expected to highlight significant capacity constraints
in many areas. 
Housing and
Affordable
Housing
Housing Requirement and Housing Need
Midlothian Local Development Plan no. 2 (MLDP2) will need to allocate land for a minimum of 8,850. That
figure is the MATHLR (Minimum All Tenure Housing Requirement Land Requirement for Midlothian, as set
out in Scottish Government’s NPF4 (National Planning Framework no. 4). 
A breakdown of how the MATHLR figure is arrived at is set out below: 
Factors Producing the NPF4 MATHLR   Number of Households
2018 Population and Housing Estimates
from NRS (National Records of
Scotland) 10 year household projection
for Midlothian
5,950 households
Existing housing need in Midlothian
identified by the third Housing Needs
and Demand Assessment for Edinburgh
and South East Scotland (HNDA3)
1,114
Total 7,064
25% generosity allowance added 1,766
Combined figures, rounded to nearest
50, giving the NPF4 MATHLR
8,850 (7,064 + 1,766 rounded to
nearest 50) 
This table demonstrates the levels of actual housing need originating from Midlothian, 1,114 households,
and projected population growth. The housing need is made up from 762 households in homelessness/
Page 25 of 108

Page 26

6 
temporary accommodation, 64 households both overcrowded and concealed, and 288 with support
needs/special forms of housing – totalling 1,114 households.  
The third Housing Needs and Demand Assessment for Edinburgh and South East Scotland (HNDA3) was
given “robust and credible” status from the Scottish Government’s Centre for Housing Market Analysis
(CHMA) on 28 July 2022. This means it was considered to robustly and credibly demonstrate the housing
need and demand in Midlothian and should be used for plan making purposes. 
In the years that MLDP2 will operate (2026-2036), the HNDA3 identifies demand for 2725 units social rent,
1310 below market rent, 430 private rent, 1835 owner occupied.  The HNDA figures for established need
(1,114 households/homes) were also used to inform the MATHLR. 
Early information received from the private sector house building industry indicates, in their view, that these
housing figures are an under estimate of need and demand in Midlothian. 
Affordable Housing
The high cost of housing has been raised very frequently in public engagement as part for evidence
gathering for production of draft Evidence Reports. 
The Council has a housing waiting list of over 4,000 people. It was at just under 5,000 in 2016 but the
introduction of allocating houses to most in need may have reduced the number from that level. The
demand is predominantly (approximately 85%) for one and two bedroom properties. 
The Council has over 6,500 properties and they have a low turnover, i.e. properties don’t become
frequently available. There are approximately 3,500 Registered Social landlord (RSL) properties in
Midlothian. 
Council officers have met with representatives of the private and social rented (Registered Social Landlords
- RSLs) through the evidence gathering process. Both groups expressed concern at the implications of
raising affordable housing requirements of 25% from market housing site allocations. This concern was
based upon a higher affordable housing requirement potentially making sites less viable and therefore
Page 26 of 108

Page 27

7 
potentially less likely to come forward. The RSL concern was based them not getting land for sites if sites
did not come forward through the planning system. 
Homelessness
Council planning officers engaged with Council homelessness officers and Shelter Scotland. Key points of
this engagement are: 
• There was a sharp increase in number of homeless applications in 2022/2023. Most of this increase
has been applications from males who are single parents with access to children. Due to changes in
the Unsuitable Accommodation Order (UAO) that group can no longer be provided with any form of
shared accommodation for more than 7 days.
• Reduction in open homeless cases continues – a 45% reduction since March 2018. The proportion
of people seeking temporary accommodation remains relatively high. Therefore the reduction in
temporary accommodation usage has not been to the same extent – a 20% reduction in number of
households in temporary accommodation since March 2018)
• 55% reduction in the number of homeless cases open for 2+ years since March 2020 (data was not
collected before this time); and
• Recent legislation on limitations on evictions currently in place may have stopped the impact of the
full impact of cost of living increase becoming evident.   
Second Homes and Vacant Housing Stock
Data for 2022 indicates there are approximately 43,231 homes in Midlothian. Of these less than 1% are
long term empty dwellings, approximately 360 homes. There are also nearly 390 homes that are
unoccupied and unfurnished for less than six months a year. Around 57, or 0.13%, of the total 43,231
homes are second homes (furnished, lived in for at least 25 days a year but are not someone’s main
residence). The data on these matters has been relatively static over the past five years. 
The number of short-term lets (less than 6 months) is less clear, with 136 available on listings of a major
operator. 
Page 27 of 108

Page 28

8 
Houses in Multiple (HMOs)
The latest data, from 2021, indicates there are 46 HMO properties in Midlothian and there has been little
change in the past decade. While the number is comparatively small, they do require management to help
avoid localised issues. 
Housing Need for Students and those in High Education
As required by the Planning (Scotland) Act 2019 engagement has occurred with higher and further
education institutions in Midlothian. Information from the institutions themselves indicated there was little
demand from younger students for student accommodation in Midlothian. Anecdotally, information was
collected from student representative bodies that indicated the cost of private rented accommodation in
Midlothian was a barrier to living in Midlothian as a student. 
Older and Disabled People
As required by the Planning (Scotland) Act 2019 engagement has occurred with these groups and needs to
be reflected in the Proposed Plan. Engagement with disabled groups has indicated a shortage of truly
accessible homes, homes that are accessible throughout the house and garden. Anecdotal evidence
indicates demand to stay in homes or purchase private homes, but there are not sufficient numbers of
accessible homes available for purchase, and owners have to undertake accessibility improvements. Work
is being undertake to see what data may be available on demand for retirement housing and bungalow
accommodation. 
Gypsy/Travellers and Travelling Showpeople
Site at the former Smeaton Colliery closed in recent years and no provision is made in Midlothian for
Gypsy/Travellers and Travelling Showpeople. There is a shortage of information available on these
communities and is hard to obtain, partly due to the transient nature of these communities. Engagement
work is continuing with people in this area to identify information. 
Page 28 of 108

Page 29

9 
Transport Information has been collected on national policy requirements for transport and summarised for a
Midlothian context to be set out in the Transport Evidence Report(s). Planning officers have engaged with
Transport Scotland, SEStran, Sustrans, and bus operators to, respectively, identify national policy issues
and issues for MLDP2. 
Active Travel 
Engagement feedback has been for more foot path networks and active routes in existing and new
development. 
Public Transport
Recurring comments and opportunities were received during public engagement: 
• bus services need to be more frequent, direct, and reliable.
• prioritise public transport and active travel in new developments and include in the early stages of
development;
• develop public transport hub areas;
• link Midlothian towns and villages via a circular bus route service.  Develop east-west routes;
• link and connect rural villages and provide community buses and short distance services;
• provide more bus services to Edinburgh, including express services;
• provide bus services to Edinburgh Royal Infirmary, retail parks and Country Park locations;
• provide bus links and shuttle services to Borders Rail stations;
• improve pedestrian access to bus stops, improve lighting and the condition of bus stops; and
• consider tram and rail links to west Midlothian. 
Electric Vehicles (EV)
National policy information has been collected on electric vehicles and will be used to inform MLDP2.   
The current EV charging infrastructure in Midlothian includes a series of charge points in and around the
towns with 10,000 or more residents.  Gaps in the current EV charging infrastructure are evident in the
settlements below 10,000 residents, including the more rural towns and villages.  Approximately one
quarter (17no.) of the total publicly available charging devices (72no.) in Midlothian are rapid charging. 
Page 29 of 108

Page 30

10 
Forecasts suggest that by 2026, there may be 4,500 electric vehicles in Midlothian, which will require up to
700 publicly accessible charging points.  By 2030, there could be as many of 15,000 electric vehicles in
Midlothian, potentially needing over 2,200 publicly accessible charging points. 
Parking 
Public engagement outlined a significant volume of negative responses regarding the topic of traffic and
parking.  Recurring comments and opportunities received were: 
• issues with parked cars blocking roads;
• need for park and ride facilities;
• lack of appropriate parking (including in town centres);
• inappropriate parking at junctions, side streets, pavements, verges, etc., leading to traffic congestion;
and
• larger parking bays required for car parking. 
Roads
National policy information has been collected on road matters and the strategic transport network and will
be used to inform MLDP2. 
Public engagement outlined a significant volume of negative responses regarding roads and traffic. 
Recurring comments and opportunities received were: 
Opportunities / Investment
• concerns in relation to the timescale and the delivery of the proposed Sheriffhall grade separation
development;
• need to divert HGV traffic away from towns and between trunk roads; and
• need to develop roads infrastructure before new build housing. 
Constraints / Capacity
• traffic increased due to new build housing sites;
• too many cars for the present infrastructure;
Page 30 of 108

Page 31

11 
• current infrastructure not built for current amount of housing;
• traffic capacity issues, especially in areas closer to Edinburgh;
• capacity issues at the Eskbank Toll and Sheriffhall roundabouts and Straiton, Hillend and City
Bypass junctions. 
Condition
• road infrastructure needs to be upgraded; and
• roads, car parks, pavements, potholes need repaired. 
Safety / Speed
• need for speed restrictions in residential areas, including physical solutions, traffic calming and
20mph limits; and
• speed limits (20mph) not being enforced. 
Economy  Planning officers have sought to engage with partners, including Midlothian and East Lothian Chambers of
Commerce, Midlothian Science Zone and Midlothian Council Economic Development colleagues to gather
information for Evidence Reports to inform MLDP2 production.   
General Economic Trends in Midlothian
• According to Office of National Statistics data Midlothian has one of Scotland’s fastest growing
economies. 
• Higher proportions of Midlothian’s population are economically active and in employment than the
Scottish average. Unemployment is lower than Scotland overall. 
• Average earnings are lower in Midlothian than the Scottish average.
• Planning officers are continuing engagement to understand future economic trends and demands in
Midlothian. 
Economic Land Supply and Demand for Economic Land
• Midlothian has generally seen quite slow take-up at its economic sites, and at the take up rate of the
last 10 years there is an excess of 30 years land supply at the immediately available sites. Part of
Page 31 of 108

Page 32

12 
this is the shortage of serviced sites, i.e. with economic sites with infrastructure and built business
units available. One reason for slow take up may be the higher land values associated with housing
uses compared to economic, creating a disincentive for landowners to release land for economic
uses.  The cost of servicing sites, and making sites suitable (which can be high in the Midlothian
context of former mineworkings) may also be a contributory factor.
• Evidence from the Council’s Economic development and Estates colleagues indicates strong
demand for industrial units in Midlothian and that Midlothian is seen as a good location, due to its
location to Edinburgh and the strategic road network. 
Gross Value Added (GVA) Data
• Gross Value Added (GVA) per Capita in Midlothian was £18,536 in 2020, ranked 25th out of 32
Scottish local authorities. This represented a climb in the ranking from 30th out of 32 in 1998. Data
indicates Midlothian is becoming more integrated with the regional economy with more workers
travelling into Midlothian than previously. In 2001 there were nearly 3 workers (2.7) leaving the
district for work, for every one that came in.  By 2011 this ratio had fallen to less than 2 (1.9). 
However, Gross Value Added (GVA) data is workplace based and perhaps highlighted out migration
for work lowers GVA levels for Midlothian, as those workers travelling out of Midlothian are
contributing to GVA in another location than Midlothian. 
Midlothian Science Zone (MSZ)
• Planning and economic development officers have met with representatives of the Midlothian
Science Zone (MSZ) forum members as part of MLDP2 engagement. 
• MSZ forum highlighted the importance of the site to the local, regional and national economy and the
word class nature of what occurs in this location – and the range of potential growth opportunities for
Midlothian. 
• MSZ Forum members wished to stress that the site was the largest concentration of animal science
research in Scotland and supported over 3,000 high quality jobs.
• The MSZ forum said investment is available, and sufficient land is allocated, but infrastructure
constraints are limiting further investment. 
Community Wealth Building
Page 32 of 108

Page 33

13 
• This is a concept tMLDP2 will need to examine to help maintain and increase spend and decision
making on investment in Midlothian. 
• Midlothian Council expects to produce a draft Community Wealth Building (CWB) Action Plan in
March/April 2024, aimed at this retaining and increasing of spend, investment and decision making
in Midlothian and the Midlothian economy. 
• The Council plans to set up sub-groups for interested stakeholders in October/November 2023,
under the 5 pillars of CWB. 
Tourism Engagement with the Midlothian Tourist Forum and operators has provided views and information on issues
and opportunities for tourism in Midlothian. A summary of issues raised are: 
• there is a data shortage in sector which limits knowledge on what the issues are;
• need better facilities for disabled access at many sites;
• need for better public transport and active links to encourage visitors;
• need better car parking for sites dependent upon private cars for access;
• more hotel provision is required and quality, not just quantity;
• the planning system can be barrier to diversification of businesses, particularly in rural areas.
• many town centres are unattractive;
• huge opportunities exist to join up small scale tourist attractions; 
• need for electric car charging points in car parking facilities; 
• future development should not impinge upon the quality of life and environment of existing residents;
and
• balance required between tourism and existing uses (e.g. aims of protecting the Pentland Regional
Park so that farming and other land uses can co-exist). 
Culture and
Creativity
In line with NPF4 requirements, evidence has been collected on the heritage and assets across the Council
area. It is a subjective area, but evidence gathered included: 
• the Dalkeith Arts Centre is valued; 
• there is a good variety of clubs and social events;
• craft spaces for self-employed with stalls are needed;
• not every community has a village hall and this is needed;
Page 33 of 108

Page 34

14 
• in smaller rural communities, it was felt that there was a lack of social spaces outwith those provided
by church halls;
• a lack of recording and performing spaces, such as recording studios and theatres was highlighted; 
• it was suggested that council buildings could be used in the evenings and at weekends for theatre
schools and live music;
• empty buildings could host Edinburgh Fringe and Film Festival events;
• a cinema is needed; and
• public transport provision can be a barrier to people accessing venues. 
Information on local and statutory designations was also collated as part of gathering information on
culture. This relates to information in other Evidence Reports, including in the Historic Assets and Place
Evidence Report chapter and the Inventory of Buildings at Risk in the Brownfield, Vacant and Derelict Land
and Empty Buildings Evidence Report chapter. 
Developer
Contributions
Work is ongoing to identify mechanisms for an approach for MLDP2 to secure developer contributions
where it is able to do so in line with planning legislation. This will feed into MLDP2 production. 
Town, Local and
Commercial
Centres and
Retail
Information has been collected from national retail policy, and its implications for MLDP2, to support town
centres, local centres and retailing. MLDP2 will also need to consider how it supports future uses of town
centres if/when their nature and purpose changes. 
Information on matters such as the proportion of retail spend online and the impact of that on spend in
shops will also need to be considered. Midlothian’s last survey data of Midlothian residents dates from
2012. It indicated that internet shopping had reached 8.2% of sales in the comparison sector (in that year
internet sales were 9.3% of total at UK level). By 2020 the UK internet spend was 16.5%. Covid affected
internet shopping. By the 4 fourth quarter of 2020, 36% of retail spend was on the internet. That fell back to
27.5% by quarter 4 of 2022. The future trends are unknown, particularly with the UK having the highest
proportionate online retail spend levels and no forerunner examples to compare against. 
Page 34 of 108

Page 35

15 
Town Centres
Information on the location and composition of Midlothian town centres has been gathered. A summary is
provided in the below table: 
Centre Number of
shops
Other
premises
identified
as falling
within 2023
UCO class
1A
definition*
Cafes/restaurants Hot food
takeaways
and
Betting
Shops
Vacancy
rate**
Bonnyrigg
town centre
40 5 3 8 0%
Dalkeith town
centre
86 19 7 8 9%
Gorebridge
town centre
5 4 0 3 n/a
Mayfield town
centre
13 4 1 2 n/a
Loanhead
town centre
19 3 2 5 8%
Newtongrange
town centre
18 7 2 3 n/a
Penicuik town
centre
31 13 7 8 23%
Source: Assessors, 2021 data.  
*note there are many offices which provide a service to visiting members of public which are just recorded
as offices in Assessor’s records, this list includes those where it was clear from the valuation roll
description.    
Page 35 of 108

Page 36

16 
** vacancy rate calculated from separate CoStar dataset, 
The condition of town centres has been a subject of concern at engagement events and on the ‘citizen
space’ feedback system.  A lack of variety and quality of retail facilities has been raised, with some
respondents stating that they rarely use their nearest Midlothian town centre.  This qualitative data reflects
the previous findings of the 2012 Midlothian retail study which found that convenience expenditure was
mostly at large supermarkets, only some of which are located in town centres. Further that comparison
expenditure was mostly directed to commercial centres or centres outwith Midlothian (in order of spending:
Newcraighall/Fort Kinnaird, Straiton, Edinburgh City Centre, then Dalkeith town centre).  From public
engagement there does appear to be interest in using the town centre to host a wider variety of uses
beyond retailing, and uses that will pull people into the town centres.   
Local Centres
These form an important part of the network of centres and contribute to the local living / 20 minute
neighbourhood concept being promoted by Scottish Government.  The adopted plan identified local centres
and these are identified in the draft Evidence Report. 
As a rapidly growing area, Midlothian is forming new neighbourhoods and settlements.  In some of these
growth areas, the development plan identifies new neighbourhood hubs and in the case of Shawfair, a new
town centre. There have been challenges in delivering these. Provision of new retail facilities in new
developments has been raised at engagement events to help support local living. 
Other Uses
Other issues for MLDP2 to consider are the location of betting shops, hot food take aways, drive through
restaurants and pay day loan or “high-cost short-term credit” premises. Details on the location and numbers
of such uses are in the draft Evidence Report. 
Commercial Centre
NPF4 requires local development plans to support proposals for improving the sustainability of existing
commercial centres where appropriate. MLDP2 will need to consider the future of Straiton and the wider
area (including site Ec3), its land uses and its connectivity by means other than the private car. This point
Page 36 of 108

Page 37

17 
on accessibility of Straiton arose in public engagement for MLDP2. The environment for pedestrian access
and public transport connections, particularly and east west across Midlothian, will need to be considered. 
Page 37 of 108

Page 38

18 
Appendix A - Part 2: Summary of Headline Issues for MLDP2 Evidence Reports
Evidence Report
Topic/Chapter
Summary of Evidence Collected 
Natural Places
and Landscape 
Natural Places and
Landscape (inc.
natural heritage
and landscape
designations)
Information has been collected MLDP2 production on the number and location of natural heritage
designations in Midlothian: (Special Areas of Conservation (SAC), Special Protection Areas (SPA), Sites
of Special Scientific Interest (SSSI), Local Nature Reserves, Local Biodiversity Sites, Local Geodiversity
Sites and Special Landscape Area (SLAs). These cover a significant land coverage of Midlothian and
are very important to its character, nature and landscape.   
These designations will be considered to identify how they will inform production of MLDP2, in terms of
development strategy and the policies in NPF4 on natural heritage. These designations, in themselves,
have not generated significant, issues during engagement. It is care for the natural environment that the
designations seek to help protect that has generated input and issues, i.e. concern for the environment
and desire to protect the environment.   
Built Environment 
Historic assets and
places
Information has been collected on the number and location of listed buildings, conservation areas,
scheduled monuments, gardens and designed landscapes, buildings at risk. Information collected on in-
built carbon in the historic environment and implications of climate change on the historic environment
have been collected. These will be considered to identify how they will inform production of MLDP2, in
terms of development strategy and the policies in NPF4 on built heritage. 
The stage for consideration of changes to the boundaries of designations, such as conservation areas,
is at the MLDP2 Proposed Plan production stage of 2024/2025. 
Brownfield, vacant
and derelict land
Public engagement, along with national planning policy, supports use of brownfield land first before
greenfield development. 
Page 38 of 108

Page 39

19 
and empty
buildings
Information collected through MLDP2 Evidence Report production indicates there are not significant
quantities of brownfield or vacant and derelict land in Midlothian on which to base the Local Housing
Land Requirement for MLDP2. Such sites though will be reviewed as part of the production of the
Proposed Plan for MLDP2. MLDP2 will need to consider uses and the future for such sites. An internally
produced urban capacity study is being prepared to help inform the Evidence Reports and MLDP2. 
Coalescence and
Green Belt
Settlement Coalescence
Settlement Coalescence was raised as a strong concern in public engagement in 2023 as part of
evidence gathering for Evidence Report production. 
A significant number of locations in Midlothian, much of the built-up area, are or are perceived to be
experiencing or being under threat from coalescence. The following areas can be identified as such:   
• Dalkeith and Easthouses
• Mayfield and Newtongrange
• Gorebridge and Newtongrange
• Eskbank and Bonnyrigg
• Roslin, Bilston and Loanhead 
• Loanhead and Lasswade/Kevock 
• The A701 Corridor 
• Shawfair and Cauldcoats 
The Newbattle Strategic Greenspace Safeguard has been considered by Council officers and some
others outside of the Council to have bene a success in carrying out its purpose. This tool could be
examined further in MLDP2. 
Green Belt
A formal Green Belt Review has not been undertaken at Evidence Report stage. It is likely any formal
review of the Green Belt would have to be undertaken as part of a wider cross-boundary review with
neighbouring planning authorities. 
Page 39 of 108

Page 40

20 
It is anticipated that this might take place during the next Local Development Plan cycle (MLDP3) and
therefore has no implications upon MLDP2. However, any decisions on boundary changes or land
releases from the existing Green Belt will be made on a site-by-site basis at MLDP2 Proposed Plan
stage. 
A whole Green Belt review was undertaken by Lothian local authorities over 10 years ago and this
informed production of the currently adopted MLDP (2017). 
Renewable
Energy
Generation 
Wind, Solar,
Geothermal and
other types of
renewable energy
generation
National policy has been collected on different sources renewable energy generation. Engagement still
on going. 
Consideration will need to be given in MLDP2 preparation on the role of the 2012 wind energy
landscape capacity study commissioned by Midlothian Council in MLDP2, especially in the context of
NPF4 and the Council’s 2019 Climate Emergency declaration. MLDP2 will need to continue support for
renewable, low-carbon and zero emissions technologies and seek to realise Midlothian’s full potential
for electricity and heat. 
Infrastructure
(Excluding Health,
Education and
Roads) 
Energy
Infrastructure
Engagement is on going with service providers about supply issues in Midlothian. 
Significant cost for electricity grid connection, for power from key substations for new development, has
been raised with the Council by power providers and those promoting development.   
Page 40 of 108

Page 41

21 
Engagement has been had with gas suppliers which indicates: demand for gas remains steady, the high
pressure gas network mains will remain with some reinforcement in the future, and potential in the future
for developing heat networks and hydrogen supply. 
The Scottish Government’s Vision for Scotland’s Electricity and Gas Networks sets out aspirations for
electricity supplies to meet power requirements for low carbon transport and heating, and a gas
distribution network that considers a blend of increasing quantities of low carbon gases with natural gas,
including hydrogen, biomethane, and bio-synthetic natural gas. 
Zero Waste Data has been collected on waste and recycling in Midlothian. Consideration of this will be needed on
how it is reflected in the strategy and policy framework of MLDP2. 
Household waste data outlines a reduction in landfilled waste in Midlothian from 44.1% to 12.4%
between 2017 and 2021. Evidence outlines that landfill sites are currently operational at Drummond
Moor and Middleton Quarry.  The anticipated dates for ceasing landfill at these sites are 2025 and 2030
respectively.   
Household waste data outlines a steady level of waste recycling in Midlothian between 2017 (51.6%)
and 2021 (47.4%), which are below the national target of 70% by 2025.   
Household waste data outlines an increase in waste diverted from landfill (e.g. treated by incineration,
biological and heat treatment) between 2017 and 2021 from 1,819 to 17,651 tonnes.  The reduction in
landfilled waste reflects the incineration of waste now occurring at the Millerhill Recycling and Energy
Recovery Centre (RERC).  It is hoped that the RERC and the Millerhill Anaerobic Digester facilities will
help Midlothian Council contribute to the national recycling targets of 70% by 2025, and only 5% of
waste going to landfill by 2025. 
Digital Data has been collected on mobile phone and broadband issues and coverage for consideration in the
MLDP2 development strategy. Engagement is still on going for business and domestic users. 
Page 41 of 108

Page 42

22 
Mobile signal coverage (4G quality) data per mobile network operator outlines a range of coverage
across the Midlothian towns from average to very good.  Roslin, Loanhead, Dalkeith and Lasswade
rated highest, and Penicuik rated lowest in terms of overall mobile signal coverage across the four main
operators.  This is reflected in mast location data, which confirms a fewer number of masts within 7km of
Penicuik, Gorebridge and Pathhead. 
The Employment Land Audit outlines mobile phone coverage (4G and non-4G) and broadband
coverage at the employment land sites throughout Midlothian.  Mobile phone coverage is excellent
throughout many sites, but is lower in parts of Dalkeith, Rosewell, Roslin and Midlothian Science Zone. 
The Employment Land Audit outlines broadband coverage across the Midlothian employment land sites. 
Standard availability is good across all sites, however standard speed (maximum 11Mbps) is variable
across all sites and is highest at Midlothian Science Zone (MSZ).  Superfast availability ranges from
average to good across the sites, but there are some sites in Dalkeith, Shawfair and MSZ with no
availability.  Superfast speed (maximum 50Mbps) is variable across all sites and lowest in parts of
Roslin, Shawfair and Midlothian Science Zone. 
Heating and
Cooling
Information from and on national policy is being collected to inform MLDP2 production. 
MLDP2 will be required develop policy and proposals, which:
• encourage and support the requirement for heat networks within developments;
• require developments in specific areas or within an identifiable heat network zone to connect to
an existing heat network where available;
• provide within the site an independent network and plant capable of connecting to the wider
network in the future;
• provide heating/ cooling system within any building capable of connecting in a future date; and
• heat and cool the building through a renewable form of energy produced on site. 
The Local Heat and Energy Efficiency Statement (LHEES) Strategy and Delivery Plan will inform the
MLDP2 spatial strategy and policy, including the identification of potential Heat Network Zones. 
Page 42 of 108

Page 43

23 
The Midlothian Energy Ltd evidence outlines a series of planned heat network infrastructure (the
Shawfair and Little France Spines and transmission pipework), which will inform the MLDP2 spatial
strategy. The evidence also notes that it is unlikely that the Shawfair network will connect to Dalkeith in
the short to medium term. 
Water and
Drainage
Engagement has been on going with Scottish Water since the adoption of the current MLDP in 2017 to
keep them informed of development progress on sites. This engagement has continued during
production of Evidence Reports for MLDP2. 
Scottish Water need to be informed of development locations and development programming/phasing to
help guide their capital investment decisions and help support efficient use of resources. 
Enhanced SUDS will be required in MLDP2 for removing surface water from the mains drainage
system, to help reduce loss/take up of drainage capacity. 
Work is underway to identify existing blue green infrastructure assets and potential gaps in this network.
Other workstreams to be delivered over the life of MLDP2 such as the Surface Water Management
Plans for Midlothian will contribute to this.   
Consideration as part of preparation of MLDP2 for protection of strategic aqueducts, and also strategic
water supply assets along the A701 corridor, should be had. 
Blue and Green
Infrastructure 
Blue and Green
Infrastructure (inc.
Blue Green
Network, Open
Space, Play and
Sport and
Allotments and
Information is being collected on this to identify in the MLDP2 blue and green networks and
opportunities for increased connectivity. 
Open space, play facilities, and blue green networks are being mapped to inform the development
strategy and policy framework of MLDP2. The location of core paths and active travel routes will also
inform MLDP2 production. Provision of allotments and growing spaces will need to be considered in
production of MLDP2.
Page 43 of 108

Page 44

24 
Food Growing,
Burial and
Cremation) 
Burial and Cremation
Information collected indicates that Midlothian has a surplus of land for burials, more than sufficient for
MLDP2 to meet statutory requirements. In some locations consideration may be required for MLDP3.
Proportionately cremations are increasing and levels of burial are decreasing. Evidence indicates that a
crematory in Midlothian would not be sustainable, particularly with the crematory proposed for Old
Craighall in East Lothian. 
Flood Risk and
Water
Management 
Flood Risk and
Surface Water
Management
Flood Risk
Flood risk in Midlothian is primarily from surface water flooding. The Rivers North Esk, South Esk and
Tyne are deeply incised as they pass though Midlothian, and traditionally flooding has been less of a
concern in the county. However, climate change is projected to increase rainfall and frequency of major
down pours. 
Some of the smaller streams flowing off the Pentland Hills, particularly around Bilston and Penicuik give
concern.  There are two flood prevention schemes in Midlothian (Polton Road Bridge Relief and Rullion
Road Flood Prevention Scheme).   
The Esk and Tyne rivers flow to East Lothian where the settlements are on flatter adjoining land.
Flooding is a cross boundary issue, and there is potential for works in Midlothian to contribute to
alleviating downstream flood risk in East Lothian and City of Edinburgh.  Cross border working will be
required through MLDP2. 
It will be important to ensure that Midlothian’s high growth rate does not result in properties being put at
risk of flood hazard.  Avoidance of flood risk will need to be an important consideration in selection of
sites for development in MLDP2.   
Page 44 of 108

Page 45

25 
Design, maintenance and adoption of SUDS will be an important consideration for MLDP2 to help
manage surface water run-off and improve water quality. 
Water Quality
While water quality is not found by SEPA to be bad or poor at any Midlothian surface water body, only
moderate status has been found on significant sections of the North and South Esk.   
Midlothian’s water environment is for the most part classified as poor quality by the SEPA Water
Environment Hub.  The primary reason for this is lack of fish access.  This may require development to
remove or ameliorate weirs (which in some cases are part of listed buildings). 
Waste Water
Scottish Water has been expanding the capacity of the waste water system in Midlothian to handle new
development. 
Page 45 of 108

Page 46

26 
Appendix B - 28 November 2023 Planning Committee Report
Draft Schedule of Evidence Reports being produced for Midlothian Local Development Plan 2 “Gate Check” – format and
structure may be subject to change 
NPF4 Theme:  Sustainable Places 
No. Evidence Report
Evidence Report Topic Number and Title: 1 Climate Change Mitigation and Adaptation
Evidence Report Chapter Number and Title: 1.1 Climate Change Mitigation and Adaptation   
Evidence Report Topic Number and Title: 2 Biodiversity 
Evidence Report Chapter Number and Title: 2.1 Biodiversity (inc. Nature Networks, Securing Positive Effects for
Biodiversity, Soils in Midlothian) 
2.2 Forestry, Woodland and Trees   
Evidence Report Topic Number and Title: 3 Natural Places and Landscape
Evidence Report Chapter Number and Title: 3.1 Natural Places and Landscape (inc. natural heritage and landscape
designations)   
Evidence Report Topic Number and Title: 4 Built Environment
Evidence Report Chapter Number and Title: 4.1 Historic assets and places 
4.2 Brownfield, vacant and derelict land and empty buildings 
4.3 Coalescence and Green Belt   
Evidence Report Topic Number and Title: 5 Transport
Evidence Report Chapter Number and Title: 5.1 Active Travel 
5.2 Public Transport 
5.3 Electric Vehicle Charging 
5.4 Parking Standards 
5.5 Roads
Page 46 of 108

Page 47

27 
Evidence Report Topic Number and Title: 6 Renewable Energy Generation
Evidence Report Chapter Number and Title: 6.1 Wind 
6.2 Solar 
6.3 Geothermal 
6.4 Other Types of Renewable Energy   
NPF4 Theme:  Liveable Places
Evidence Report Topic Number and Title: 7 Infrastructure First
Evidence Report Chapter Number and Title: 7.1 Energy Infrastructure 
7.2 Zero Waste 
7.3 Digital 
7.4 Heating and Cooling 
7.5 Education 
7.6 Health (inc. Healthier Places, Health and Social Care Services, Emergency
Services, Health and Safety) 
7.7 Developer Contributions 
7.8 Water and Drainage  
Roads are listed in chapter 5.5   
Evidence Report Topic Number and Title: 8 Blue and Green Infrastructure
Evidence Report Chapter Number and Title: 8.1 Blue and Green Infrastructure (inc. Blue Green Network, Open Space, Play
and Sport and Allotments and Food Growing, Burial and Cremation)   
Evidence Report Topic Number and Title: 9 Flood Risk and Water Management
Evidence Report Chapter Number and Title: 9.1 Flood Risk and Surface Water Management   
Evidence Report Topic Number and Title: 10 Housing
Evidence Report Chapter Number and Title: 10.1 Housing (inc. Housing Need and Demand, Local Housing Land
Requirement, Affordable Housing, Specific Needs/Adapted Housing,
Page 47 of 108

Page 48

28 
Gypsy/Travellers and Travelling Showpeople. Rural Homes is in Rural
Development Evidence Report)   
Evidence Report Topic Number and Title: 11 Quality of Place
Evidence Report Chapter Number and Title: 11.1 Local Living and 20 Minute Neighbourhoods 
11.2 Design, quality and place 
11.3 Local Place Plans   
NPF4 Theme:  Productive Places
Evidence Report Topic Number and Title: 12 Economy
Evidence Report Chapter Number and Title: 12.1 Business, Industry and Community Wealth Building 
12.2 Rural Development (inc. Rural Housing) 
12.3 Tourism 
12.4 Culture and Creativity 
12.5 Minerals   
Evidence Report Topic Number and Title: 13 Town, Local and Commercial Centres and Retail
Evidence Report Chapter Number and Title: 13.1 Town, Local and Commercial Centres and Retail   
Page 48 of 108

Page 49

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.2
PLANNING PERFORMANCE FRAMEWORK ANNUAL REPORT 2022/23
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 This report provides an update on the progress of work undertaken on
the Planning Performance Framework (PPF) for Midlothian. 
Specifically, it provides feedback from Scottish Government on the
Council’s submitted PPF for 2022/23.
2 BACKGROUND
2.1 An initial report to Committee in November 2012 explained that from
October 2012 the Scottish Government’s Minister for Local
Government and Planning (now Public Finance, Planning and
Community Wealth) had instigated a new Planning Performance
Framework system under which each local planning authority in
Scotland would be required to submit annually a report to Scottish
Government on its performance across a range of quantative and
qualitative measures, including the long-standing indicators of age of
local plan(s) and speed of handling planning applications.  Accordingly,
this Council has prepared and submitted an annual PPF report every
year since 2011/12.  The feedback from Scottish Government has
been reported to the Committee (except for the 2019/20 submission).  
2.2 As reported to Committee in November 2012 it remains the case that
Scottish Government officials have made clear that the primary
purpose of the PPF is to provide Ministers, Councils and the public
with a much better understanding of how a particular planning authority
is performing.  Whilst it is inevitable that comparisons across planning
authorities will be made, Scottish Government is advising that it is not
a ‘name and shame’ exercise: where particular authorities may be
underperforming the Scottish Government officials through normal
liaison with officers in the relevant authorities will seek to assist and
support improvement.
2.3 The Council’s PPF for 2022/23 was submitted to Scottish Government
in July 2023.  A copy of the document has been placed in the
Members’ Library and on the Council’s website.  It provides a
comprehensive review of progress during the year and highlights
steady improvement in a number of areas and examples of good
quality development taking place on the ground.  
Page 49 of 108

Page 50

3 FEEDBACK ON THE 2022/23 SUBMISSION
3.1 Formal written feedback was received 20 October 2023 by way of a letter from
the Minister for Local Government Empowerment and Planning, and enclosing
a specific report on a total of fifteen ‘performance markers’.  A copy of the
feedback is attached to this report as Appendix A.
3.2 In the feedback report on the fifteen performance markers, 13 were
rated as ‘green’ giving no cause for concern, none were rated as
‘amber’ where areas for improvement are identified and two were rated
as ‘red’, this being used to indicate where some specific attention is
required.  The ratings demonstrate a high level of performance and
reflects the team’s commitment to delivering a good service.  The
feedback on ratings will help to inform the content of the 2023/24
return, which will be due in July 2024.
3.3 The red markers relate to performance criteria 4) legal agreements and
7) local development plan.  With regard to legal agreements the
average time to determine a planning application with a legal
agreement for 2022/23 was 45.1 weeks, slower than the Scottish
average of 41.1 weeks – this reflects the complexity of the legal
agreements in Midlothian, the teams commitment to secure as high a
contribution as possible from applicants (which results in extended
negotiations) and the legal processes involved.  With regard the age of
the local development plan (the Midlothian Local Development Plan
was adopted in December 2017), it is now more than five years old,
this is in part because of the delays in the Scottish Government
adopting the National Planning Framework No.4 (NPF4) for Scotland
and for the delay in the Scottish Government publishing the local
development plan regulations (both published in 2023) which delayed
the commencement of Midlothian’s review of its local development
plan.  The pre NPF4 target was to review a local development plan
within five years of adoption – the target for post NPF4 local
development plans is 10 years.
3.4 The PPF feedback also sets out the timescales for the determination of
planning applications.  The average time to determine local (non-
householder) developments for 2022/23 was 13.5 weeks, quicker than
the Scottish average of 14.4 weeks.  The average time to determine
householder developments for 2022/23 was 7.2 weeks, quicker than
the Scottish average of 8.9 weeks.  The average time to determine
major developments for 2022/23 was 43.7 weeks and was slower than
the Scottish average of 39.5 weeks.  The reasons why some planning
applications take an extended time period to conclude are as follows:
• High workloads and competing priorities in the Planning Service;
• Negotiations to improve a development proposal or to resolve
outstanding matters;
• Delays in receiving consultation responses from internal and
external services and organisations;
• The conclusion of a planning obligation to secure developer
contributions – both the negotiations and legal processes; and
Page 50 of 108

Page 51

• Awaiting for the applicant to submit the required information to
conclude the assessment of a planning application.
4 RECOMMENDATION
4.1 It is recommended that the Committee notes the feedback from
Scottish Government on the Council’s submitted Planning
Performance Framework (PPF)  for 2022/23.
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager
Date: 17 November 2023
Contact Person:  Peter Arnsdorf
Email:   peter.arnsdorf@midlothian.gov.uk
Background Paper: 1) Midlothian’s PPF (2022/23) submission available
in the Members library and on the Council’s
website; and 2) Ministers feedback on Midlothian’s
PPF (2022/23) submission attached as Appendix A.
Page 51 of 108

Page 52


PERFORMANCE MARKERS REPORT 2022-23
Name of planning authority: Midlothian Council
The High Level Group on Performance agreed a set of performance markers. We have assessed your report against
those markers to give an indication of priority areas for improvement action. The high level group will monitor and
evaluate how the key markers have been reported and the value which they have added.
The Red, Amber, Green ratings are based on the evidence provided within the PPF reports. Where no information or
insufficient evidence has been provided, a ‘red’ marking has been allocated. 
No. Performance Marker RAG
rating
Comments
1 Decision-making: continuous
reduction of average timescales for
all development categories [Q1 -
Q4]
Green Major Applications
Your average timescale is 43.7 weeks which is faster than
the previous year but slower than the Scottish average of
39.5 weeks.
RAG = Green
Local (Non-Householder) Applications
Your average timescale is 13.5 weeks which is slower than
the previous year but faster than the Scottish average of 14.4
weeks.
RAG = Amber
Householder Applications
Your average timescale is 7.2 weeks which is faster than the
previous year and faster than the Scottish average of 8.9
weeks and within the statutory timescale.
RAG = Green
Overall RAG = Green
2 Processing agreements:
• offer to all prospective
applicants for major
development planning
applications; and
• availability publicised on
website
Green You have set out how processing agreements are offered for
all major developments.
RAG = Green
You have set out information on processing agreements on
your website which includes a link to the form, instructions for
additional information and sets out expectations on what the
agreement will involve.
RAG = Green
Overall RAG = Green
3 Early collaboration with applicants
and consultees
• availability and promotion
of pre-application
discussions for all
prospective applications;
and
• clear and proportionate
requests for supporting
information
Green You offer pre-application discussions for all types of
applications and also meet regularly with applicants,
developers and landowners to inform them of the Councils
approach to future developments.
RAG = Green
You have a pre-application guide on your website which
includes further guidance on additional supporting
information that will be required.
RAG = Green
Overall RAG = Green
4 Legal agreements: conclude (or
reconsider) applications after
resolving to grant permission
reducing number of live
applications more than 6 months
after resolution to grant (from last
reporting period)
Red Your average timescale for legal agreement applications is
45.1 weeks which is slower than the previous year and
slower than the Scottish average of 41.1 weeks.
You set out in your committee reports the requirement to
conclude agreements within 6 months and list the projects
and infrastructure associated. You have noted that this
process has helped conclude agreements faster, issue
Appendix A
Page 52 of 108

Page 53


permissions sooner and reduce the likelihood of legacy
cases.
5 Enforcement charter updated / re-
published within last 2 years
Green You have updated your enforcement charter on October
2022 which is within the last 2 years.
6 Continuous improvement:
• progress ambitious and
relevant service
improvement commitments
identified through PPF
report
Green You have completed 9 out of 11 improvement commitments
which were identified last year, with one other partially
achieved and another carried over to this year.
You have identified a further 9 for the coming year.
7 Local development plan less than
5 years since adoption
Red Your LDP was 5 years and 4 months at the end of the
reporting period which is more than 5 years since adoption.
8 Development plan scheme – next
LDP:
• project planned and
expected to be delivered to
planned timescale
Green You updated your Development Plan Scheme in March 2023
which sets out that your next LDP will adopted within 5 years,
by end of 2026. Your latest Development Plan Scheme
includes timescales for each key stage and has outlined
activities and engagement which will need to be carried out.
9
&10 LDP Engagement:
stakeholders including Elected
Members, industry, agencies, the
public and Scottish Government are
engaged appropriately through all
key stages of development plan
preparation.
Green You have commenced early preparations on the next LDP
and have undertaken a wide range of engagement for
elected members, industry and key agencies. Some of the
engagement includes preparing a series of workshops
regarding NPF4 as well as meeting with industry to discuss
housing targets and input into the new LDP policies.
11 Policy Advice:
Production of relevant and up to
date policy advice
Green You have continued to produce relevant policy advice during
the reporting period including commencing work on the Fala
Conservation Area Character Appraisal and Management
Plan as well adopting supplementary guidance on Low
Density Rural Housing.
12 Corporate working across
services to improve outputs and
services for customer benefit (for
example: protocols; joined-up
services; single contact
arrangements; joint pre-application
advice)
Green You have provided a range of examples of corporate working
across services. This includes housing, education, financial
and community services working together on Developer
Contributions.
13 Sharing good practice, skills and
knowledge between authorities
Green You have provided a range of examples of sharing good
practice during the reporting period. This include discussions
with Fife and Glasgow City Council on best practice to
implement Strategic Environmental Assessment based on
the new LDP process as well as collaborating with Fife, East
Lothian Council and West Lothian Council on work involving
the City Region Deal and Regional Spatial Strategy.
14 Stalled sites / legacy cases:
conclusion or withdrawal of old
planning applications and reducing
number of live applications more
than one year old
Green You have cleared 2 cases during the reporting period, the
same as last year. The number of cases remaining has
decreased from 9 to 7.
15 Developer contributions: clear
and proportionate expectations
• set out in development plan
(and/or emerging plan);
and
• in pre-application
discussions
Green You have stated that clear expectations relating to developer
contributions are set out in the the Development Plan.
RAG = Green
You have provided numerous examples where developer
contributions were set out and were part of the pre-
application discussions. For example, discussions were held
during the pre-application stage regarding possible developer
contributions to help deliver solutions to traffic issues
associated with a proposed school and community facility.
RAG = Green
Overall RAG = Green
Page 53 of 108

Page 54


MIDLOTHIAN COUNCIL
Performance against Key Markers
Marker 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23
1 Decision making
timescales
2 Processing
agreements
3 Early collaboration
4 Legal agreements
5 Enforcement charter
6 Continuous
improvement
7 Local development
plan
8 Development plan
scheme
9 &
10
LDP Early
Engagement N/A N/A N/A
11 Regular and
proportionate advice
to support
applications 
12 Corporate working
across services
13 Sharing good
practice, skills and
knowledge
14 Stalled sites/legacy
cases
15 Developer
contributions
Overall Markings (total numbers for red, amber and green)
2012-13 3 8 4
2013-14 2 8 5
2014-15 3 5 5
2015-16 5 4 4
2016-17 2 4 7
2017-18 0 3 12
2018-19 1 2 12
2019-20 1 3 11
2020-21 0 4 11
2021-22 0 0 14
2022-23 2 0 12
Decision Making Timescales (weeks)
13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23
2022-23
Scottish
Average
Major
Development 60.5 77.4 47.8 84.7 91.5 45.8 65.6 76.2 44.6 43.7 39.5
Local
(Non-
Householder)
Development
19.7 11.0 10.7 11 12.1 11.1 15.0 13.3 10.5 13.5 14.4
Householder
Development 6.9 6.7 6.9 6.8 6.9 6.4 6.6 6.9 8.2 7.2 8.9
Page 54 of 108

Page 55

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.3
LISTED BUILDING ENFORCEMENT NOTICE APPEAL DECISION WITH
REGARD THE INSTALLATION OF SIGNAGE, VINYL GRAPHICS AND
CHANGE OF COLOUR OF SHOP FRONTAGE AT 118 HIGH STREET,
DALKEITH. 
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of a listed
building enforcement notice appeal decision with regard the installation
of signage, vinyl graphics and change of colour of shop frontage at 118
High Street, Dalkeith (USA Nails).
2 BACKGROUND
2.1 118 High Street, Dalkeith is a Category C listed building.  It is part of a
C Group of listed buildings with Nos 116 and 118a High Street.  It is
also within the Dalkeith House and Park Conservation Area.
2.2 A listed building enforcement notice was issued on the occupiers and
owner of the property on 16 August 2023, with a take effect date of 16
September 2023 and a compliance date of 16 December 2023.  A copy
of the enforcement notice is attached to this report as Appendix B.  The
enforcement notice required the owner and occupier of the property to:
1) Remove the fascia signage panel from the shopfront and make
good any holes created for fixings.
2) Repaint the shopfront in any of the following colours
• RAL1014 or
• RAL7000-7006 or
• RAL7009-7012 or
• RAL5008
3) Removal of vinyl graphics from the shop windows.
2.3 The occupier appealed the listed building enforcement notice - a
Scottish Government Reporter appointed to determine the appeal
dismissed it and upheld the listed building enforcement notice.  A copy
of the appeal decision is attached to this report as Appendix A.  As a
Page 55 of 108

Page 56

consequence of the appeal the compliance period is extended to 10
February 2024.
3 THE DECISION
3.1 In considering the appeal the Reporter concluded:
“… I consider that neither the fascia signage nor the vinyl graphic
signage are in keeping with the character of the listed building or the
conservation area. The proposed fascia signage also extends slightly
below the original window opening, cutting across the window detailing.
I find that the signage (fascia and vinyl graphics) does not preserve the
listed building, nor does it preserve or enhance the character or
appearance of the conservation area, contrary to the HES guidance
and LDP policy ENV 22. While I acknowledge the financial implications
for the appellant, I am not convinced that the cost of and time involved
in removing or replacing the signage is reasonable grounds to allow
inappropriate signage in this sensitive and prominent location.”
3.2 The Reporter therefore dismissed the appeal, refusing to grant listed
building consent for the matters covered in the listed building
enforcement notice, and directed the notice be upheld subject to
variation of the compliance period.
4 RECOMMENDATION
4.1 It is recommended that the Committee notes the enforcement notice
appeal decision with regard the installation of signage, vinyl graphics
and change of colour of shop frontage at 118 High Street, Dalkeith
(USA Nails).
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager
Date:    17 November 2023
Contact Person: Peter Arnsdorf, Planning, Sustainable Growth and
Investment Manager
peter.arnsdorf@midlothian.gov.uk
Page 56 of 108

Page 57

Planning and Environmental Appeals Division
Hadrian House, Callendar Business Park, Falkirk, FK1 1XR
E: dpea@gov.scot                                     T: 0300 244 6668
Appeal Decision Notice

Decision
I dismiss the appeal and refuse to grant listed building consent for the matters covered in
the listed building enforcement notice. I direct that the notice be upheld, subject to an
amendment to section 6 of the notice, to delete ‘by 16 December 2023’ and replace with
‘within three months of this notice taking effect’. Subject to any application to the Court of
Session, this notice takes effect on the date of the decision, which constitutes the
determination of the appeal for the purpose of Section 35(3) of the Planning (Listed
Buildings and Conservation Areas)(Scotland) Act 1997 (the Listed Buildings Act).
Reasoning
1. The appeal was made on the following grounds as provided for by section 35(1) of
the Listed Buildings Act:
(e) that listed building consent ought to be granted for the works, or that any relevant
condition of such consent which has been granted ought to be discharged, or different
conditions substituted.
2. I am required by Section 14(2) of the Listed Buildings Act to have special regard to
the desirability of preserving the building or its setting or any features of special
architectural or historic interest which it possesses. Under section 64(1) of the Listed
Buildings Act, I must also pay special attention to the desirability of preserving or enhancing
the character or appearance of the conservation area.
3. The building is category C listed, in a group with 116 and 118a High Street. It lies
within the Dalkeith House and Park Conservation Area. The site is one of a number of retail
and commercial uses along both sides of the High Street. The appeal site is a prominent
location, clearly visible on the main approach into the town centre from the north.
Decision by Rosie Leven, a Reporter appointed by the Scottish Ministers
• Listed building enforcement appeal reference: LBE-290-2001
• Site address: 118 High Street, Dalkeith, EH22 1HZ
• Appeal by USA Nails Dalkeith against the listed building enforcement notice dated
16 August 2023 served by Midlothian Council
• Alleged breach of listed building control: installation of signage, vinyl graphics and change
of colour
• Ground(s) of appeal under s.35(1) of the Act: (e)
• Date of site visit by Reporter: 2 November 2023
Date of appeal decision: 10 November 2023
Appendix A
Page 57 of 108

Page 58

LBE-290-2001 2
4. Section 5 of the enforcement notice requires three steps: remove the fascia signage
panel from the shopfront and make good any holes created for fixings; repaint the shopfront
(in one of a range of specified colours); and remove vinyl graphics from the shop windows.
5. Historic Environment Scotland’s advice on shopfronts and signs (the HES guidance)
highlights the contribution that historic shopfronts can make to the character of a place. It
notes that alterations including signage can affect a building’s visual amenity and character.
New lettering must be carefully designed to respect the character of a building and be
located appropriately. Fixings that cut across architectural detail should be avoided.
6. The council points me to policy ENV22 of the Midlothian Local Development Plan
(LDP) which seeks to protect the character and appearance of the listed building and I have
had regard to this in my assessment.
7. The council highlights that a previous successful townscape heritage scheme has
resulted in a number of updated shopfronts in the town centre. This was evident from my
site visit, with a number of well designed, attractive shopfronts and signs. The council
considers that the signage installed (fascia and vinyl graphics) does not respect the historic
character and appearance of the shopfront and detracts from the character, appearance
and historic interest of the property. In relation to this part of the conservation area, the
council’s Conservation Area Character Appraisal highlights opportunities for much better
design of shop fronts which frequently detract from the better facades above.
8. At the time of lodging the appeal the appellant indicated that the vinyl graphic
signage had been removed and the shopfront repainted. On the date of my site visit, the
vinyl signage had not been removed and was apparent on both windows. On my site visit
I was also able to confirm that the shopfront has been repainted from pink to grey, as shown
on the appellant’s photographs. The appellant has confirmed that the paint used is one of
the colours specified by the council. While I note that the majority of the shopfront has been
repainted, the new paint appears to stop near to the edge of the fascia signage and I
assume that it does not continue behind the fascia panel.
9. The appellant wishes to retain the fascia signage, suggesting that it is expensive and
time-consuming to change. The fascia signage is modern in terms of style and material,
with the lettering in a modern font, in bright, primary colours. I consider that this style and
colour contrasts negatively with the traditionally designed shopfront, now in a muted colour.
10. Along the High Street, there are a range of different styles of shopfront and signage,
using different colours and fonts. While the property immediately to the south west has fairly
modern signage, it does use muted colours and no evidence is submitted on whether that
signage required, or has received, listed building consent. Many of the other shopfronts
along the High Street use traditional signage, fonts and muted colours. It is evident to me
that attempts are being made to improve signage and shopfront design in this part of the
town centre.
11. As a result, I consider that neither the fascia signage nor the vinyl graphic signage
are in keeping with the character of the listed building or the conservation area. The
proposed fascia signage also extends slightly below the original window opening, cutting
across the window detailing. I find that the signage (fascia and vinyl graphics) does not
preserve the listed building, nor does it preserve or enhance the character or appearance of
the conservation area, contrary to the HES guidance and LDP policy ENV 22. While
I acknowledge the financial implications for the appellant, I am not convinced that the cost
Page 58 of 108

Page 59

LBE-290-2001 3
of and time involved in removing or replacing the signage is reasonable grounds to allow
inappropriate signage in this sensitive and prominent location.
12. Taking all of the above into account, I dismiss the appeal in relation to the removal of
the fascia signage and vinyl graphics. I recognise that the shopfront has been partially
repainted. However, in the absence of any approved signage, the requirement to repaint the
shopfront is retained to ensure that the terms of the enforcement notice are fully met
following removal of the fascia signage, to preserve the character of the listed building and
the conservation area.
13. I note that the time period for compliance in the council’s enforcement notice is
stated as 16 December 2023. As this would have provided three months for compliance
from the date the notice came into effect, I amend the notice to provide similar provision.
Accordingly, the appeal is dismissed in its entirety, subject to an amendment on the time
period for compliance.
Rosie Leven
Reporter
Page 59 of 108

Page 60

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
IMPORTANT – THIS COMMUNICATION AFFECTS YOUR LAND OR
PROPERTY 
Planning (Listed Buildings and Conservation Areas) (Scotland) Act
1997, as amended (“the Act”) 
LISTED BUILDING ENFORCEMENT NOTICE 
Issued by Midlothian Council
16 August 2023
This Notice is served on:
USA Nail and Spa
118 High Street 
Dalkeith
EH22 1HZ 
The Property Owner
118 High Street 
Dalkeith
EH22 1HZ 
The Occupier
118 High Street 
Dalkeith
EH22 1HZ 
Ashiq Commercial Properties Limited
32 Redburn Road
Prestonpans
EH32 9NG 
Appendix B
Page 60 of 108

Page 61

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
Hestiview Limited
One Chamberlain Square Cs
Birmingham
B3 3AX 
1. THIS IS A FORMAL NOTICE which is issued by Midlothian Council under
Section 34 of the Act because the Council considers that there has been a
breach of planning control within Sections 6 and 8(1) of the Act at the listed
building described below. The Council considers that it is expedient to issue
this notice, having regard to the effect of the character of the building as one
of special architectural or historic interest and provisions of the development
plan. 
2. THE LISTED BUILDING AFFECTED 
118 High Street, Dalkeith, EH22 1HZ 
It forms part of a Category C Listed Building (Listed Building Reference
24412, date of listing 30 June 1983). 
It is located within the Dalkeith House and Park Conservation Area. 
3. THE MATTERS WHICH APPEAR TO CONSTITUTE THE BREACH OF
PLANNING CONTROL 
Without listed building consent: 
 Repainting of the shopfront
 Installation of fascia signage 
 Installation of vinyl graphic signage 
4. REASONS FOR ISSUING THIS NOTICE 
Section 6 of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997 states “no person shall execute or cause to be executed
any works for the demolition of a listed building or for its alteration or
extension in any manner which would affect its character as a building of
special architectural or historic interest, unless the works are authorised. The
test for whether Listed Building Consent is required is whether the works
“would affect its character as a building od special architectural or historic
interest”. 
Page 61 of 108

Page 62

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
118 High Street is a Category C listed building. 
The signage that has been installed without consent does not reflect the
traditional features of a modern shop frontage. The use of traditional
materials, colours and designs for the shopfront and signage are encouraged
to preserve the historic interest of the listed building and prevent detrimental
impact to the character and appearance of the conservation area.  The
signage installed (fascia and vinyl graphics) does not respect the historic
character and appearance of the shopfront and detract from the character,
appearance and historic interest of the property. 
The building has also been repainted. The bright pink colour does not reflect
the traditional characters of the conservation area and has a significant
adverse impact on the character, appearance, setting and historic context of
this C listed building. 
In view of the harmful impact of the alterations, enforcement action is
required. 
5. WHAT YOU ARE REQUIRED TO DO 
1) Remove the fascia signage panel from the shopfront and make good
any holes created for fixings. 
2) Repaint the shopfront in any of the following colours
 RAL1014 or
 RAL7000-7006 or
 RAL7009-7012 or
 RAL5008 
3) Removal of vinyl graphics from the shop windows. 
6. TIME FOR COMPLIANCE 
Requirement 5(1), 5(2) and 5(3) to be complied with by 16 December 2023. 
7. WHEN THIS NOTICE TAKES EFFECT 
This Notice takes effect on 16 September 2023 unless an appeal is made
against it beforehand. 
Page 62 of 108

Page 63

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
Signed: 
Matthew Atkins
Lead Officer – Planning Obligations
Planning, Sustainable Growth and Investment Service 
Place Directorate 
Midlothian Council 
Date: 16 August 2023 
Page 63 of 108

Page 64

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
8. YOUR RIGHT OF APPEAL
You can appeal against this notice, but any appeal must be received, or
posted in time to be received by the Scottish Ministers before 16th September
2023. Any other person who has an interest in the land to which this notice
relates may also appeal to the Scottish Ministers by the same date.
Schedule 1 of this notice gives information on your Right of Appeal 
9. WHAT HAPPENS IF YOU DO NO APPEAL 
If you do not appeal against this enforcement notice, it will take effect on 16th
September 2023 and you must then ensure that the required steps for
complying with it, for which you may be held responsible, are taken within the
period specified in the notice. Failure to comply with an enforcement notice
which has taken effect can result in prosecution or the service of a Fixed
Penalty Notice on the relevant person(s) who have not complied with its
requirements. Failure to comply with an enforcement notice which has taken
effect may also result in the Council taking direct action to correct the breach. 
Page 64 of 108

Page 65

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
SCHEDULE 1 
EXPLANATORY NOTE FOR THOSE IN RECEIPT OF AN ENFORCEMENT
NOTICE 
RELEVANT LEGISLATION 
Sections 6, 8 and 34-39 of the Planning (Listed Building and Conservation
Areas) (Scotland) Act 1997, as amended. 
You may wish to note in particular the points referred to below 
RIGHT OF APPEAL 
If you wish to appeal against this notice, you should write to The Directorate
for Planning and Environmental Appeals, Ground Floor, Hadrian House,
Callendar Road, Falkirk, FK1 1XR or contact the DPEA via their website
https://www.dpea.scotland.gov.uk/. The appeal must be received, or posted in
time to be received by the Scottish Ministers before the date on which this
notice takes effect. The Scottish Ministers have no power to consider an
appeal lodged out of time. 
The appeal, which must be made in writing, must be based on one or more of
the grounds set out in section 35 of the Planning (Listed Building and
Conservation Areas) (Scotland) Act 1997, as amended. If you decide to
appeal you should state the facts on which you propose to rely in support of
each of the grounds of appeal. The grounds of appeal and the statement of
facts must be submitted with your appeal or within fourteen days of your being
required to do so by the Scottish Ministers. 
If you lodge an appeal, the enforcement notice is suspended and will not take
effect unless the appeal is withdrawn or dismissed. 
PENALTIES FOR NON-COMPLIANCE WITH AN ENFORCEMENT NOTICE
Where, after the end of the period for compliance with this notice, any steps
required to be taken have not been complied with, unless a valid appeal has
been made to the directorate, the person who is, for the time being the owner
of the building shall be in breach of this notice and guilty of an offence. Any
person guilty of such an offence shall be liable on summary conviction to a
fine of £50,000 or on conviction on indictment to an unlimited fine.  
Page 65 of 108

Page 66

E/23/34 
IMPORTANT – CONTINUES ON NEXT PAGE 
DIRECT ACTION FOR NON-COMPLIANCE WITH AN ENFORCEMENT
NOTICE
If the steps required by a Listed Building Enforcement Notice are not taken
within the specified period(s) the Council may enter on the land, take those
steps and recover as a civil debt from the person who is then the owner, or
the lessee of the land, any expenses reasonably incurred. 
FURTHER OFFENCES
Compliance with the terms of a listed building enforcement notice does not
discharge that notice. It will continue in effect and any repetition of the breach
of control may incur further penalties or may result in direct action by the
Council.
Page 66 of 108

Page 67

File No.
1:750Scale:
Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. 100023416 (2018)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Education, Economy
& Communities Listed Building Enforcement Notice
118 High Street
Dalkeith
EH22 1HZ
Page 67 of 108

Page 68

Page 68 of 108

Page 69

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.4
WILFUL DESTRUCTION OF TREES WITHIN THE ESKBANK AND
IRONMILLS CONSERVATION AREA AND NON-COMPLIANCE WITH A
PLANNING CONTRAVENTION NOTICE REGARDING LAND ADJACENT
TO OLD GOLF HOUSE, ESKBANK, DALKEITH
Report by Chief Officer Place
1 REPORT SUMMARY AND RECOMMENDATION
1.1 This report relates to the wilful destruction of trees within the
Eskbank and Ironmills Conservation Area and the non-compliance
with a planning contravention notice issued in relation to land
adjacent to Old Golf House, Eskbank, Dalkeith.
1.2 This report recommends that the Committee instruct the Planning,
Sustainable Growth and Investment Manager to refer the case to
the Crown Office and Procurator Fiscal Service for consideration
to be given to prosecutorial action against those parties who have
carried out the wilful destruction of trees within the Eskbank and
Ironmills Conservation Area pursuant to Section 172 of the Town
and Country Planning (Scotland) Act 1997 as amended, and have
not complied with a planning contravention notice, pursuant to
Section 126 of the Town and Country Planning (Scotland) Act
1997 as amended, hereafter referred to as the Act.  The maximum
penalty on successful prosecution is a fine of up to £20,000 with
regard the destruction of trees in a conservation area and £5,000
per offence with regard non-compliance with a planning
contravention notice. 
2 BACKGROUND
2.1 The site the subject of this report is an area of woodland on land
adjacent to Old Golf House, Eskbank, Dalkeith – the land fronts onto
Newbattle Road.  The land is separated from housing at Newbattle
Abby Crescent by a narrow un-adopted lane which provides access to
a small number of houses.  The land is adjoined by the Old Golf
House, The Mill, Barondale House and Barondale Cottages.  However,
the land is not in the same ownership of any of these properties. 
Opposite the site on the other side on Newbattle Road are further
residential properties.  The land is located within the Eskbank and
Ironmills Conservation Area.
Page 69 of 108

Page 70

2.2 On the 25 September 2023 the Council received reports of a potential
breach of planning control taking place on the said land – following a
site inspection on the same day it was identified that engineering works
(excavations and other earthworks) were taking place using
mechanical equipment.  Those parties undertaking the said works were
advised that there was a breach of planning control and works should
cease - the works constitute an engineering operation and any works to
the trees constituted an offence as they are in a conservation area. 
The parties undertaking the works declined to cease work. 
2.3 On 27 September 2023 (11:00) the Council served a Temporary Stop
Notice (TSN) pursuant to S144A of the Act as amended.  The notice
was posted at the site (in two locations) by Sheriff Officers acting on
behalf of the Council and also served on the persons identified to be
the landowners as a result of detailed title search.  Officers were also in
attendance at the site and observed the notice being displayed.  At that
time it appeared that there had been limited further engineering work
beyond that which had been observed on the 25 September 2023 and
no specific works to trees had taken place.  The TSN required the
cessation of the engineering works. 
2.4 On returning to the site later on the 27 September 2023 (14:00)
following complaints from local residents, officers identified large piles
of branches lying in the adjoining road afters works to trees had taken
place - Officers of Police Scotland were also on site in response to
concerns raised from local residents.  In the company of the Police
Officers two persons were interviewed under caution by Planning
Officers on suspicion of an offence being committed pursuant to S172
of the Act (unauthorised works to trees in a conservation area).  It was
also identified that the two copies of the TSN posted at different places
on the site at 11:00 that day had been removed by persons unknown
(although it should be noted that the act of serving the notice in the first
place brought its provisions into effect and the removals did not obviate
that). 
2.5 On 28 September 2023 Sheriff Officers served the TSN on the home
addresses of the two persons interviewed under caution the previous
day.  The TSN was also reposted at the site.  In addition, given the
engineering operations that were judged to have taken place, Planning
Contravention Notices (a formal request for information) were also
served on the two persons interviewed under caution. 
2.6 The works to the trees were subsequently assessed by the Council’s
Landscape officers who confirmed two healthy trees had been felled. 
2.7 A TSN has effect for 28 days from the date it is served – in this case
the TSN was complied with and no further engineering works were
undertaken once the TSN was issued. 
Page 70 of 108

Page 71

2.8 The unauthorised engineering works were subsequently modified as
not to cause harm and as such it is not expedient to instigate any
further action. 
3 THE LEGISLATIVE POSITION 
Trees in Conservation Areas  
3.1 Trees in conservation areas which are under the protection of a Tree
Preservation Order (TPO) are also subject to controls under the TPO
regulations – the trees subject to the works set out in this report are not
covered by a TPO but are in a conservation area.   
3.2 The Act makes special provision for trees in conservation areas which
are not the subject of a TPO (as in this case).  Under Section 172 of
the Act anyone proposing to cut down or carry out work to a tree in a
conservation area is required to give the planning authority six weeks
prior notice.  The purpose of this requirement is to give the planning
authority an opportunity to consider whether a TPO should be made in
respect of the tree/s.  Any notified works must be carried out within two
years from the date of the notice. It is an offence not to comply with
these requirements. 
3.3 Some of the works were in relation to shrubs and bushes which do not
fall within the scope of the Act.  However, 1 Witch Elm tree and 1 Ash
tree, both with diameter in excess of 75 mm were felled.  No
notification to undertake such work as required by the Act was given to
the Council and none of the exemptions (health and safety
justifications) that exist in relation to conservation area trees are
applicable in this case.  Therefore an offence was committed. 
3.4 A person/s found guilty of an offence in this regard are liable to a fine
up to £20,000. 
Planning Contravention Notice 
3.5 Planning authorities may serve a Planning Contravention Notice (PCN)
on anyone who is the owner or occupier of land subject to a planning
investigation into an alleged breach of planning control, or is a person
with any other interest in the land, or a person who is using or carrying
out operations on the land.  Planning authorities may therefore serve
several notices on different persons in respect of the same suspected
breach of planning control. 
3.6 There is no requirement for the planning authority to obtain clear
evidence of a breach of control before issuing a PCN.  It is sufficient for
the planning authority to suspect that a breach may have occurred, for
example, because they have received a complaint from a neighbour of
the site regarding an alleged unlawful activity. 
Page 71 of 108

Page 72

3.7 Serving a PCN does not constitute 'taking enforcement action' for the
purposes of section 123 of the Act.  It is an offence not to comply with
any requirement in the notice – which is a request for information (not
to cease or carry out works).  It is an entirely discretionary procedure;
there is no requirement to serve a notice before taking formal
enforcement action, nor does the serving, or not (as the case may be),
of a notice affect any other power exercisable in respect of any breach
of planning control. 
3.8 Failure to comply with a notice within 21 days of it being served is an
offence which may be charged by reference to any day or longer period
of time.  Those found guilty of such an offence will be liable on
summary conviction to a fine not exceeding level 3 (£5,000) on the
standard scale.  An offender may also be convicted of subsequent
offences by reference to any period of time (e.g. each additional day)
following a preceding conviction for such an offence (section 126 of the
Act). 
3.9 Section 125 of the Act provides that the notice may require the person
on whom it is served, so far as s/he is able—
(a) to state whether or not the land is being used for any purpose
specified in the notice or any operations or activities specified in
the notice are being or have been carried out on the land;
(b) to state when any use, operations or activities began;
(c )to give the name and postal address of any person known to
him to use or have used the land for any purpose or to be
carrying out, or have carried out, any operations or activities on
the land;
(d) to give any information he holds as to any planning permission
for any use or operations or any reason for planning permission
not being required for any use or operation; and
(e) to state the nature of his interest (if any) in the land and the
name and postal address of any other person known to him to
have an interest in the land. 
3.10 As noted above, notwithstanding the specific offence in relation to the
wilful felling and damage to trees, Planning Officers identified that a
breach of planning control appeared to have occurred with regard
unauthorised engineering operations taking place on 25 September
2023 and furthermore the same persons involved in the authorised tree
works were the persons involved in those engineering operations. 
Therefore, as noted above, planning contravention notices were served
on 28 September 2023 on the persons apprehended at the site on 27
September 2023. 
3.11 No response has been received to the notices within the prescribed 21
day period and therefore offences have been committed. 
3.12 In Scotland the Crown Office and Procurator Fiscal Service (COPFS)
are responsible for making decisions about prosecutorial actions. In the
Page 72 of 108

Page 73

majority of instances cases are referred to COPFS by Police Scotland.
In addition other bodies known as Specialist Reporting Agencies
(SRA’s) who are the responsible regulatory organisation for particular
legislative areas will also refer cases.  This includes the Health and
Safety Executive, the Scottish Environmental Protection Agency and
local authorities in relation to planning and other matters. 
4 OTHER CONSIDERATIONS 
4.1 The Scottish Government Policy on planning enforcement is contained
in Circular 10/2009: Planning Enforcement.  It includes the following
guidance that is particularly relevant to the consideration of this case: 
“Effective enforcement plays a significant part in protecting the rural
and urban environment. In responding to complaints against
unauthorised development, enforcement action maintains the integrity
of the development control system. The range of enforcement powers
allows the enforcement response to be more appropriate, speedier and
more successful.” 
5.       CONCLUSION 
5.1 It is for COPFS to make the final decision with regard prosecutorial
action against the wilful felling and damage to trees protected by
reason of being located within a conservation area and in relation to
non-compliance with a planning contravention notice.  Two persons
were caught in the act of wilfully felling trees in a conservation area -
this was an offence.  Furthermore, those persons having been served
with a planning contravention notice, on the basis of unauthorised
engineering operations taking place have not responded to the said
notices, which is also an offence. 
5.2 Therefore, having regard to the guidance provided by Scottish Minsters
in Circular 10/2009, the serious nature of the breach of planning control
and the Council’s responsibility to uphold confidence and integrity in
the planning system and the rule of law, it is considered to be in the
public interest for the Council to refer this case to COPFS.  
6 RECOMMENDATION 
6.1 It is recommended that the Committee determine to instruct the
Planning, Sustainable Growth and Investment Manager (or an
alternatively appropriately appointed officer) to refer the case to the
Crown Office and Procurator Fiscal Service for consideration of
prosecutorial action pursuant to Sections 126 and 172 of the Town and
Country Planning (Scotland) Act 1997 as amended. 
Page 73 of 108

Page 74

Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:    17 November 2023
Contact Person: Matthew Atkins, Lead Officer Planning Obligations 
matthew.atkins@midlothian.gov.uk
Page 74 of 108

Page 75

File No.
1:1,000Scale:
Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. 100023416 (2018)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Education, Economy
& Communities
Land Adjacent to Old Golf House, Newbattle Road, Eskbank,
Dalkeith, Midlothian, EH22 3LX
Page 75 of 108

Page 76

Page 76 of 108

Page 77

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.5
PRE - APPLICATION REPORT REGARDING REMEDIATION WORKS TO
PROPOSED EDUCATION CAMPUS: INCLUDING SITE REMEDIATION,
FORMATION OF HARDSTANDING, SITE PLATFORMING AND
PROVISION OF SITE ACCESS, UTILITIES/SERVICES AND DRAINAGE
AT SITE OF THE FORMER MONKTONHALL COLLIERY, NEWTON
VILLAGE, DALKEITH (23/00657/PAC)
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of the
submission of a Proposal of Application Notice (PAN) and
corresponding pre application consultation for remediation works to the
proposed education campus: including site remediation, formation of
hardstanding, site platforming and provision of site access,
utilities/services and drainage.  The land comprises part of the former
Monktonhall Colliery, Newton Village, which is located within the
Shawfair new settlement area. 
1.2   The pre-application consultation is reported to Committee to enable
Councillors to express a provisional view on the proposed major
development.  The report outlines the proposal, identifies the key
development plan policies and material considerations and states a
provisional without prejudice planning view regarding the principle of
development.
2 BACKGROUND
2.1 Guidance on the role of Councillors in the pre-application process,
published by the Commissioner for Ethical Standards in Public Life in
Scotland, was reported to the Committee at its meeting of 30 August
2022.  The guidance clarifies the position with regard to Councillors
stating a provisional view on proposals at pre-application stage.
2.2 A PAN detailing the pre-application consultation for remediation works
to the proposed education campus: including site remediation,
formation of hardstanding, site platforming, provision of site access,
utilities/ services and drainage at the former Monktonhall Colliery,
Newton Village, Shawfair was submitted on 4 October 2023. 
2.3 As part of the pre-application consultation, two public events are taking
place at Danderhall Community Hub.  One event took place on
Page 77 of 108

Page 78

Wednesday 15 November 2023 between 4.30-7pm and a second
event is scheduled to take place on Wednesday 29 November 2023,
also between 4.30-7pm.  These events are to be advertised for a four
week period in the Midlothian Advertiser which commenced on
Thursday 26 October 2023 as well as on the Shawfair website.  It is
also noted that the agent has placed promotional posters advertising
the events in Danderhall Primary School, Danderhall Community Hub,
Dalkeith Tesco, Dalkeith Country Park, Dobbies Garden Centre,
Millerhill Park/ Playground notice board, Shawfair Train Station notice
board, Queen Margret University and businesses located at Shawfair
Park including David Lloyd, SQA, Tanshe Care Services, and Chapter
One Childcare. 
2.4 It is reasonable for an Elected Member to attend such a public event
without a Council planning officer present, but the Member should (in
accordance with the Commissioner’s guidance reported to the
Committee at its meeting in August 2022) not offer views, as the forum
for doing so will be at meetings of the Planning Committee.  On the
conclusion of the second public event the applicant could submit a
planning application for the proposal.   
2.5 The applicant must wait 12 weeks from the submission of a PAN
before submitting a planning application.  The earliest date that the
planning application for this proposal could be submitted is the 27
December 2023.  The subsequent planning application must be
accompanied by a Pre Application Consultation Report detailing the
consultation undertaken, a summary of written responses and views
expressed at the public events, and explanation of how members of
the public were given feedback on the applicant’s consideration of their
views. 
2.6 Copies of the pre application notices have been sent by the
prospective applicant to the local elected members in Ward 3 -
Dalkeith, along with Danderhall and District Community Council. 
3 PLANNING CONSIDERATIONS 
3.1  In assessing any subsequent planning application the main planning
issue to be considered in determining the application is whether the
currently proposed development complies with development plan
policies unless material planning considerations indicate otherwise.
The views of consultees and representors will be material
considerations in the assessment of an application for the proposed
development. 
3.2 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan 2017 (MLDP). 
Section 24(3) of the Town and Country Planning (Scotland) Act 1997
states that where there is an incompatibility between the provisions of
the National Planning Framework and the provisions of a local
development plan whichever of them is the later in date is to prevail. 
At present this means that where there is an incompatibility NPF4
Page 78 of 108

Page 79

takes precedence, this will change when a new local development plan
is adopted. 
3.3 The application site is located to the north east of Newton Village and
forms part of the former Monktonhall Colliery.  It is located within the
Shawfair new settlement area, to the south of the Millerhill Recycling
and Energy Recovery Centre, between the Millerhill Marshalling Yard
(to the west) and the Borders Railway (to the east).  The south western
edge of the site is located within the Shawfair town centre zone.  The
site is currently not in use. 
3.4 The relevant policies of the National Planning Framework 4 (NPF4)
are: 
• Policy 1 - Tackling the climate and nature crisis; 
• Policy 2 - Climate mitigation and adaption; 
• Policy 3 - Biodiversity; 
• Policy 9 - Brownfield, vacant and derelict land and empty
buildings;
• Policy 13 - Sustainable transport; 
• Policy 14 - Design, quality and place; 
• Policy 15 - Local Living and 20 minute neighbourhoods; 
• Policy 18 - Infrastructure first; Policy 19- Heat Network Zone; 
• Policy 21 - Play, recreation and sports; 
• Policy 22 - Flood risk and water management; 
• Policy 23 - Health and safety; 
• Policy 24 - Digital infrastructure; and, 
• Policy 27 - City, town, local and commercial centres. 
3.5 The relevant policies of the MLDP are: 
• STRAT1 - Committed Development; 
• STRAT5 - Strategic Employment Land Allocations; 
• DEV2 - Protecting Amenity within the Built-Up Area; 
• DEV5 - Sustainability in New Development; 
• DEV6 - Layout and Design of New Development; 
• DEV7 - Landscaping in New Development; 
• TRAN1 - Sustainable Travel; 
• TRAN5 - Electric Vehicle Charging;  
• IT1 - Digital Infrastructure; 
• TCR1 - Town Centres; 
• ENV10 - Water Environment; 
• ENV15 - Species and Habitat Protection and Enhancement; 
• ENV16 - Vacant, Derelict and Contaminated Land; 
• Policy ENV24 - Other Important Archaeological or Historic Sites; 
• ENV25 - Site Assessment, Evaluation and Recording; 
• NRG6 - Community Heating; 
• IMP1 - New Development; 
• IMP2 - Essential Infrastructure to Enable New Development to
Take Place; and, 
Page 79 of 108

Page 80

• IMP3 - Water and Drainage. 
3.6 The MLDP Danderhall/Shawfair settlement strategy clarifies that
development should proceed in line with the planning permission for
the Shawfair community and the Shawfair Masterplan and Design
Guide (and associated addendums) which set out the development
framework for the Shawfair development.  Within the Shawfair
Masterplan and MLDP (Appendix 2) the former Monktonhall Colliery is
identified as being suitable for a variety of uses that will be compatible
and beneficial to the wider Shawfair development. 
3.7  It is noted that the site was included within the application area for the
outline planning permission for Shawfair which was granted in 2014
(02/00660/OUT), however condition 35 of the permission established
that the land at the former Monktonhall Colliery formed part of an
exclusion area where no planning permission has been granted.  This
was because it was not included within the Section 75 legal agreement
and development in this area would need to be subject to further
assessment.  This condition was carried over into the subsequent
variation of the original planning permission which was approved in
2019 (condition 26 of 17/00650/S42). 
3.8 At its meetings of December 2015 and February 2017, the Council
approved an education strategy for the Shawfair new settlement area
which involved using the ‘town centre’ site for education and
community purposes.  Although this decision does not mean that
planning permission should automatically be granted for the proposed
development, the Council decision is a material consideration in
supporting the proposed development which would help facilitate the
provision of an education campus on this site. 
3.9 The site was also granted planning permission in principle
(19/00112/PPP) in September 2019 for the erection of a community
facility incorporating a secondary and primary school, early learning
provision and family learning, leisure, healthcare and Class 4 business
facilities.  This consent lapsed in 2022 but nonetheless supports the
principle of the site being remediated to enable a future use as an
education campus. 
3.10 The provision of an education campus is an integral part of the
Shawfair development.  As such, if an application is submitted, there
will be a presumption in favour of proposed development for the
remediation works to facilitate the delivery of a proposed education
campus at the site subject to it complying with the planning permission
for the Shawfair area and the Shawfair Masterplan and Design Guide. 
4 PROCEDURES 
4.1  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures provides for Councillors to express a
‘without prejudice’ view and to identify material considerations with
regard to a major application.
Page 80 of 108

Page 81

4.2  The Committee is invited to express a ‘without prejudice’ view and to
raise any material considerations which they wish the applicant and/or
officers to consider.  Views and comments expressed by the
Committee will be entered into the minutes of the meeting and relayed
to the applicant for consideration. 
4.3  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures advises that Councillors are expected to
approach their decision-making with an open mind in that they must
have regard to all material considerations and be prepared to change
their views which they are minded towards if persuaded that they
should. 
5 RECOMMENDATION 
5.1 It is recommended that the Committee notes:
a) the provisional planning position set out in this report; 
b) that any comments made by Members will form part of the minute 
of the Committee meeting; and 
c) that the expression of a provisional view does not fetter the 
Committee in its consideration of any subsequent formal planning 
application. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:   17 November 2023 
Application No:   23/00657/PAC
Applicant:  Shawfair LLP
Agent:    Lucy Moroney- Colliers 
Validation Date:  4 October 2023
Contact Person:  Eilidh Paul 
Email:    Eilidh.Paul@midlothian.gov.uk 
Background Papers:   02/00660/OUT, 17/00650/S42 and 19/00112/PPP
Attached Plan:  Location plan   
Page 81 of 108

Page 82

Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. 100023416 (2022)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Planning Service
Place Directorate
Proposal of application notice for remediation works to
proposed education campus: including site remediation,
formation of hardstanding, site platforming, provision of site
access, utilities/ services and drainage at Site of Former
Monktonhall Colliery, Newton Village, Dalkeith,
File No: 23/00657/PAC
Scale:1:6,000 ±Page 82 of 108

Page 83

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.6
PRE - APPLICATION REPORT REGARDING EXTENSION TO EXISTING
QUARRY; RETENTION OF PROCESSING PLANT; INSTALLATION OF
ANCILLARY EQUIPMENT AND ASSOCIATED WORKS AT TEMPLE
QUARRY, GOREBRIDGE (23/00662/PAC)
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of the
submission of a Proposal of Application Notice (PAN) and
corresponding pre-application consultation for an extension to an
existing quarry; retention of processing plant; installation of ancillary
equipment and associated works at Temple Quarry, Gorebridge.  
1.2   The pre-application consultation is reported to Committee to enable
Councillors to express a provisional view on the proposed major
development.  The report outlines the proposal, identifies the key
development plan policies and material considerations and states a
provisional without prejudice planning view regarding the principle of
development.
2 BACKGROUND
2.1 Guidance on the role of Councillors in the pre-application process,
published by the Commissioner for Ethical Standards in Public Life in
Scotland, was reported to the Committee at its meeting of 30 August
2022. The guidance clarifies the position with regard to Councillors
stating a provisional view on proposals at pre-application stage.
2.2 A PAN detailing the pre application consultation for an extension to an
existing quarry; retention of processing plant; installation of ancillary
equipment and associated works at Temple Quarry, Gorebridge was
submitted on 10 October 2023. 
2.3 In addition to the PAN the applicant has also submitted a request for a
scoping opinion (23/00661/SCO) in relation to an environmental impact
assessment (EIA) – this request is currently subject to consultation and
assessment. 
2.4 As part of the pre-application consultation process, two public events
are scheduled to be held.  The first took place at Middleton Village
Community Hall on 14 November 2023.  The second is scheduled for
Page 83 of 108

Page 84

16 January at the same venue.  On the conclusion of the second public
event the applicant could submit a planning application for the
proposal.  It is reasonable for an Elected Member to attend such a
public event without a Council planning officer present, but the Member
should (in accordance with the Commissioner’s guidance reported to
the Committee at its meeting in August 2022) not offer views, as the
forum for doing so will be at meetings of the Planning Committee. 
2.5 An applicant must wait 12 weeks from the date of submission of a PAN
before submitting a planning application.  The earliest date that the
planning application for this proposal could have been submitted is 3
January 2024, subject to the second public event being concluded. 
The subsequent planning application must be accompanied by a Pre-
Application Consultation Report detailing the consultation undertaken,
a summary of written responses and views expressed at the public
events, and explanation of how the applicant took account of the views
expressed and an explanation of how members of the public were
given feedback on the applicant’s consideration of their views. 
2.6 Copies of the pre application notices have been sent by the
prospective applicant to the local elected members in Ward 6 –
Midlothian South and Moorfoot Community Council. 
3 PLANNING CONSIDERATIONS 
3.1  In assessing any subsequent planning application the main planning
issue to be considered in determining the application is whether the
currently proposed development complies with development plan
policies unless material planning considerations indicate otherwise.
The views of consultees and representors will be material
considerations in the assessment of an application for the proposed
development.  The Council’s Resource Extraction Supplementary
Guidance will also be a material consideration in the assessment of an
application for the proposed development. 
3.2 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan 2017 (MLDP). 
Section 24(3) of the Town and Country Planning (Scotland) Act 1997
states that where there is an incompatibility between the provisions of
the National Planning Framework and the provisions of a local
development plan whichever of them is the later in date is to prevail. 
At present this means that where there is an incompatibility NPF4
takes precedence, this will change when a new local development plan
is adopted.  
3.3 The current quarry measures 42.5 hectares in area and is situated at
Outerston, which is 2.5 kilometres southeast of Temple and 2.5
kilometres southwest of North Middleton.  The material is transported,
via a conveyor belt, to a processing area at Guildie Howes, which
measures 15 hectares and is 700 metres southwest of North
Middleton.  The current permissions for the onsite operations
(12/00384/DPP, 12/00387/DPP and 12/00388/DPP) expire 31
Page 84 of 108

Page 85

December 2025.  The proposed extension area is an area of
agricultural fields to the north of the Guildie Howes site. 
3.4 The extension site measures 25.5 hectares and comprises six
agricultural fields, a small pond and an area of wetland.  The site is
bounded by the A7 to the northeast, Guildie Howes Road and an
agricultural field to the southeast, and an unclassified road and
agricultural field to the southwest.  Processing of sand and gravel
would be carried out at the existing processing area, with the two sites
being linked via a conveyor belt.  Extraction at the existing site would
cease and the land there would be restored for agricultural use. 
3.5 The sites of both the expansion area and the processing area are
designated as countryside in the MLDP.  The sites are not identified in
the MLDP as being Areas of Search for Surface Mineral Extraction. 
3.6 The relevant policies of the National Planning Framework 4 (NPF4) are: 
• Policy 1 Tackling the climate and nature crises
• Policy 2 Climate mitigation and adaptation
• Policy 3 Biodiversity
• Policy 4 Natural Places
• Policy 5 Soils
• Policy 6 Forestry, woodland and trees
• Policy 7 Historic assets and places
• Policy 12 Zero Waste
• Policy 13 Sustainable Transport
• Policy 20 Blue and green infrastructure
• Policy 22 Flood risk and water management
• Policy 23 Health and Safety
• Policy 26 Business and industry
• Policy 29 Rural Development
• Policy 33 Minerals 
3.7    The relevant policies of the MLDP are: 
• DEV1 – Community Identity and Coalescence
• DEV5 – Sustainability in New Development
• DEV6 – Layout and Design of New Development
• DEV7 – Landscaping in New Development
• ECON5 – Industries with Potentially Damaging Impacts
• TRAN1 – Sustainable Travel
• TRAN2 – Transport Network Interventions
• TRAN4 – Freight
• MIN1 – Areas of Search for Surface Mineral Extraction
• MIN2 – Surface Mineral Extraction
• RD1 – Development in the Countryside
• ENV6 – Special Landscape Areas
• ENV7 – Landscape Character
• ENV9 – Flooding
Page 85 of 108

Page 86

• ENV10 – Water Environment 
• ENV11 – Woodland, Trees and Hedges
• ENV15 – Species and Habitat Protection and Enhancement
• ENV17 – Air Quality
• ENV18 – Noise
• ENV19 – Conservation Areas
• ENV22 – Listed Buildings
• ENV25 – Site Assessment, Evaluation and Recording
• IMP1 – New Development
• IMP2 – Essential Infrastructure Required to Enable New
Development to Take Place
• IMP3 – Water and Drainage  
3.8 If an application is submitted there will be a presumption against
mineral extraction at this location as the site is outwith the areas of
search for surface mineral extraction identified in the MLDP.  The
planning history of the surrounding area and in particular the historic
use of the Guildie Howes site and the former Middleton Limeworks to
its south will be material considerations in the assessment of any
application.  Other considerations in the assessment of any application
will include the development’s impact on the landscape, the water
environment, biodiversity, trees, noise, dust, residential amenity,
ground contamination and road safety. 
4 PROCEDURES 
4.1  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures provides for Councillors to express a
‘without prejudice’ view and to identify material considerations with
regard to a major application. 
4.2  The Committee is invited to express a ‘without prejudice’ view and to
raise any material considerations which they wish the applicant and/or
officers to consider.  Views and comments expressed by the
Committee will be entered into the minutes of the meeting and relayed
to the applicant for consideration. 
4.3  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures advises that Councillors are expected to
approach their decision-making with an open mind in that they must
have regard to all material considerations and be prepared to change
their views which they are minded towards if persuaded that they
should. 
5 RECOMMENDATION 
5.1 It is recommended that the Committee notes: 
a) the provisional planning position set out in this report; 
b) that any comments made by Members will form part of the minute 
of the Committee meeting; and
Page 86 of 108

Page 87

c) that the expression of a provisional view does not fetter the 
Committee in its consideration of any subsequent formal planning 
application. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:   17 November 2023 
Application No:  23/00662/PAC
Applicant:  Breedon Trading Limited
Agent:   N/A
Validation Date:  10 October 2023
Contact Person:  Graeme King
Email:    graeme.king@midlothian.gov.uk  
Background Papers: 23/00662/SCO, 12/00384/DPP, 12/00387/DPP and
12/00388/DPP
Attached Plan:  Location plan 
Page 87 of 108

Page 88

Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. AC0000811376 (2023)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Planning Service
Place Directorate
Extension to existing quarry; retention of processing plant;
installation of ancillary equipment and associated works
Temple Quarry, Gorebridge
File No. 23/00662/PAC
Scale:1:15,000 ±
Existing
extraction
site
Existing
conveyer route
>
Proposed
extraction
siteProcessing plant and
settlement lagoons for
existing and proposed
extraction sites
>
Page 88 of 108

Page 89

PLANNING COMMITTEE
TUESDAY 28 NOVEMBER 2023
ITEM NO 5.7
SECTION 42 APPLICATION 23/00532/S42 TO AMEND CONDITION 11
(PHASING OF CONSTRUCTION WORKS RELATIVE TO SITE ACCESS
ENABLING WORKS) IMPOSED ON A GRANT OF PLANNING
PERMISSION 19/01018/PPP FOR THE REDEVELOPMENT OF EXISTING
SNOWSPORTS CENTRE TO INCLUDE ADDITIONAL LEISURE
FACILITIES, HOTEL, FUNCTION SUITE, ANCILLARY RETAIL AND
RESTAURANT USES, FORMATION OF ACCESS ROAD AND CAR
PARKING AT MIDLOTHIAN SNOWSPORTS CENTRE, BIGGAR ROAD,
HILLEND.
Report by Chief Officer Place
1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1 In January 2021 planning permission in principle was granted for
the redevelopment of the existing Midlothian Snowsports Centre
to expand the snowsports facilities and associated leisure and
commercial uses (19/01018/PPP).  Subsequently, matters
specified in conditions applications have been received setting
out detailed matters secured by conditions of planning
permission 19/01018/PPP.  Work on the new access arrangements
and car park have commenced, but are not completed.  The
current application seeks to amend Condition 11 to enable onsite
work on the enhanced leisure and commercial facilities to
commence in advance of the new access arrangements and car
park being completed – condition 11 currently requires the new
access arrangements to be in place prior to work commencing on
the enhanced leisure and commercial uses.  
1.2 There have been no representations received and a consultation
response from Transport Scotland.
1.3 The relevant development plan policies are policy 18 of the
National Planning Framework 4 (NPF4) and policy VIS3 of the
Midlothian Local Development Plan 2017 (MLDP).
1.4 The recommendation is to grant planning permission subject to
conditions.
Page 89 of 108

Page 90

2 LOCATION AND SITE DESCRIPTION 
2.1 The site comprises the existing Midlothian Snowsports Centre located
near the north west boundary of Midlothian within the Pentland Hills
Regional Park.  The site fronts the A702 Trunk Road where access is
taken onto a single-track approach road to the facilities and car park.
Buildings, facilities and car parking associated with the centre are
located to the western extent of the site on the sloping gradient
between the A702 and the artificial ski slopes. There is a significant
gradient to the east down towards the A702.  
2.2  The facilities at the Snowsports Centre include the main reception
building, two main slopes (one of which is the longest artificial ski slope
in the UK), three nursery slopes, tubing runs, a chairlift allowing access
to the Pentland Hills and a café.  The site previously included a
freestyle jump surface, but this is now closed. The centre is used by
schools and members of the public. 
2.3  There are several paths through the Pentland Hills including core path
MID/39/1 running through the site towards the southern boundary
connecting the A702 to the Pentland Hills. 
2.4  There is significant tree cover on the eastern lower slopes of the site
and towards the site entrance and along this section of the approach
road from the A702. The tree cover has the impact of screening much
of the existing development from views from the A702 and from within
the recreational areas of the regional park.  It also reduces the impact
of existing car parking areas.  The landform around the site includes
significant changes in levels with some of the variation serving to help
to screen the site from wider views.  The elevated nature of the site
means that some of the existing MSC is open to view, the ski slopes
being regional features in the landscape. 
3 PROPOSAL 
3.1 The application, made under Section 42 of the Town and Country
Planning (Scotland) Act 1997 (as amended by the Planning etc.
(Scotland) Act 2006 and the Planning (Scotland) Act 2019) (hereafter
referred to as the Act), is to amend the wording of condition 11 of
planning permission 19/01018/PPP. The condition currently reads as
follows: 
No part of the development shall begin demolition or construction
unless or until: i. The new access has been provided in accordance
with the approved matters specified in conditions, or separate planning
permission, as detailed in Condition 10 and is available for use by
Calderstones and Midlothian Snowsports Centre; ii. All new footways
have been provided in accordance with the matters approved in terms
of Condition 10iii; iii. The bus turning area has been appropriately
relocated revised as appropriate in terms of Condition 10iv; and, iv A
Page 90 of 108

Page 91

Construction Management Plan has been submitted to and approved
by the Planning Authority in consultation with Transport Scotland which
allows works to the private access road and car parking to commence
at the same time as the new access approved in terms of Condition 10i
is under construction. 
3.2 It is proposed that the condition be amended to read as follows: 
No part of the development shall become operational unless or until: i.
The new access has been provided in accordance with the approved
matters specified in conditions, or separate planning permission, as
detailed in Condition 10 and is available for use by Calderstones and
Midlothian Snowsports Centre; ii. All new footways have been provided
in accordance with the matters approved in terms of Condition 10iii; iii.
The bus turning area has been appropriately relocated revised as
appropriate in terms of Condition 10iv; and, iv. A Construction
Management Plan has been submitted to and approved by the
Planning Authority in consultation with Transport Scotland which allows
works to the private access road and car parking to commence at the
same time as the new access approved in terms of Condition 10i is
under construction. 
3.3 The only change is in the first sentence: instead of …shall begin
demolition or construction, the applicant proposes to replace this with
…shall become operational.  The effect of this change would be to
allow construction works to proceed to other parts of the development
other than the access road and car park whilst the works to the main
site entrance at the A702 are underway.  The junction improvement
works must be completed before the upgraded snowsports centre
becomes operational. 
3.4 The implications of this change are purely transport related.  The
original condition is designed to control activities (and therefore an
increase in traffic movements in and out of the Midlothian Snowsports
Centre site) until after the works to the junction with the A702 have
been complete.  These works are described in planning permission
22/00169/DPP and provide signal-controlled movements through the
junction and a dedicated right-hand turning lane into the site from the
north (the city).  By accepting the amendment, this would allow the
applicant to undertake a wider extent of construction activities before
the upgrades to the A702 have been completed, but the new facilities
will not come into use until the new access is completed and
operational. 
3.5 A Section 42 application, is in itself a planning application - a particular
kind of planning application for development without complying with a
condition/s previously imposed on an earlier grant of planning
permission.  A grant of planning permission under Section 42 results in
an entirely new planning permission. 
Page 91 of 108

Page 92

3.6 Although a Section 42 application is a new planning application in law
the Act states “on such an application the planning authority shall
consider only the question of the conditions subject to which planning
permission should be granted”.  The principle, layout and form of
development are not subject to assessment.  Planning authorities
should attach to the new permission all of those conditions from the
previous permission, where it is intended these should still apply. 
4 BACKGROUND 
4.1 Planning permission in principle 19/01018/PPP for redevelopment of
existing snowsports centre to include additional leisure facilities, tourist
accommodation, hotel, function suite, ancillary retail and restaurant,
formation of access road and car parking (this application is
accompanied by an environmental impact assessment report submitted
under the terms of the Town and Country Planning (Environmental
Impact Assessment) (Scotland) Regulations 2017 was granted
planning permission in February 2021. 
4.2 Matters specified in conditions application 21/00536/MSC to discharge
condition 3 (Phasing Plan) relating to the redevelopment of existing
snowsports centre to include additional leisure facilities, tourist
accommodation, hotel, function suite, ancillary retail and restaurant,
formation of access road and car parking of 19/01018/PPP was
granted in March 2022. 
4.3 Matters specified in conditions 21/00912/MSC to discharge conditions
4 (landscaping), 6 (means of internal access etc), 9 (scheme of
lighting), 10 (access to the A702), 21 (archaeology), 28 (CEMP), 30
(electric vehicle charging points), 32 (scheme of biodiversity
enhancement) and 33 (broadband) relating to the redevelopment of
existing snowsports centre to include additional leisure facilities, tourist
accommodation, hotel, function suite, ancillary retail and restaurant,
formation of access road and car parking of 19/01018/PPP was
granted in August 2022. 
4.4 Planning application 22/00169/DPP for alterations to existing junction,
bus turning area and car park; resurfacing and associated works was
granted planning permission in August 2022. 
4.5 Planning application 22/00792/DPP for the erection of 22 floodlighting
columns (retrospective) was granted planning permission in August
2023. 
4.6 Matters specified in conditions 23/00124/MSC to discharge conditions
4 (landscaping), 5 (buildings), 19, 20 and 32 (biodiversity) relating to
the redevelopment of existing snowsports centre to include additional
leisure facilities, tourist accommodation, hotel, function suite, ancillary
retail and restaurant, formation of access road and car parking of
Page 92 of 108

Page 93

19/01018/PPP was granted in October 2023.  This application included
amendments to some of the details submitted under 21/00912/MSC. 
4.7 The application site exceeds two hectares and therefore the proposed
development constitutes a ‘Major Development’ as defined in the Town
and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009 and thereby is required to be determined by the
planning committee. 
5 CONSULTATIONS 
5.1 Transport Scotland  does not object to the application – Transport
Scotland have reviewed the proposal and have been in active dialogue
with the applicant as the works to the A702 junction have progressed. 
The works uncovered a previously unknown water main which had
implications for the delivery of the access (planning application
22/00169/DPP).  Whilst a solution is devised, the applicant wishes to
allow construction of other elements of the development so as not to
delay the project unnecessarily.  Transport Scotland accept that the
delay to works to the A702 should not delay the whole project, on the
proviso that temporary works/arrangements are put in place to allow
construction traffic to use the junction during the implementation of the
approved access and that the permanent access solution is completed
prior to the enhanced facilitates come into use. 
6 REPRESENTATIONS 
6.1 No representations have been received. 
7 PLANNING POLICY 
7.1 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan 2017. 
7.2 The following policies are relevant to the proposal: 
National Planning Framework 4 (NPF4) 
7.3 Policy 18 Infrastructure first; sets out to encourage, promote and
facilitate an infrastructure first approach to land use planning, which
puts infrastructure considerations at the heart of placemaking. 
Midlothian Local Development Plan 2017 (MLDP) 
7.4 Policy VIS3: Midlothian Snowsports Centre supports development
proposals for the upgrading and enhancement of the Midlothian
Snowsports Centre and ancillary facilities in order to secure its future
as a centre for artificial skiing and snowboarding.  Proposals with
significant adverse environmental impacts will not be supported unless
satisfactory mitigation measure are included in the proposal.
Page 93 of 108

Page 94

8 PLANNING ISSUES 
8.1 The main planning issue to be considered in determining this
application is whether the proposal complies with development plan
policies unless material planning considerations indicate otherwise.
The consultation response received is a material considerations. 
8.2 The applicant’s justification for the amendment to condition 11 is based
on the discovery of a water main near the site of the works to the A702
than anticipated – the siting and depth of the water main means that an
alternative road design needs to be considered.  In order to maintain
momentum of the wider project, construction works need to be able to
proceed before the completion of the A702 junction works.  A revised
Construction Traffic Management Plan is presented to show how the
junction would operate safely with construction traffic access/egress. 
8.3 Transport Scotland, who have responsibility for the A702, accept the
proposed amendment to condition 11 because there appears to be a
design solution to the water main complication which will enable the
construction of the new access onto the A702, implementing planning
application 22/00169/DPP, and the protection of the water main.
Transport Scotland consider that temporary junction works are needed
to maintain the safe operation of the junction.  They recommend
approval of the application but with an additional condition securing
agreement and implementation of these temporary works.  The layout
and specification of these works has been agreed with the applicant. 
8.4 Given the circumstances the project finds itself in, it is appropriate for
the planning authority to consider variations and changes to the
conditions of a planning permission to deal with unforeseen
circumstances.  In this case, it is important to ensure that the delivery
of development promoted by policy VIS3 of the MLDP comes forward
in the wider public interest.  At the same time, the development must
manage its impact on the infrastructure which supports it, namely the
vehicular connection to the trunk road network.  This is required by
NPF4 Policy 18: Infrastructure First. 
8.5 Transport Scotland remain concerned that the use of construction
traffic on the current junction arrangement could have a significant
detrimental impact on road safety.  Therefore, temporary works are
required to accommodate the additional flows to and from the
Midlothian Snowsports Centre.  These should be secured by condition
– the proposed new condition is: 
Notwithstanding the phasing plan secured by Condition 3 and
approved under application 21/00536/MSC, no part of the
development shall begin demolition or construction unless or until
the proposed temporary traffic management works (including
associated lighting, drainage, road sign, and road markings works)
have been constructed to a layout and type (and method) of
construction generally in accordance with Drawing TM-O 70868
Page 94 of 108

Page 95

TM004, Drawing TM-O 70868 TM004A, and complying with
Transport Scotland’s Requirements of Temporary Traffic
Management, all to the satisfaction of the Planning Authority, in
consultation with Transport Scotland as the trunk road authority. 
Reason: To minimise interference with the safety and free flow of
traffic on the trunk road. 
8.6 Subject to adherence to this condition, the proposed amendment to
condition 11 can be accepted. 
8.7 On this basis, the proposed amendment is accepted as helping to
deliver of the development strategy of the MLDP whilst mitigating the
impacts of development on local transport infrastructure as required by
NPF4 Policy 18. 
8.8 The approval of the Section 42 application to amend conditions of the
original consent results in the release of a new planning permission in
principle. This can cause procedural issues when it comes to
discharging those conditions which have been discharged already for
parts of the scheme, whilst others remain. - If a new planning
permission in principle is granted, then the applicant would technically
be operating in breach of planning control – however, rather than
asking the applicant to resubmit all previous information to discharge
the conditions that have been discharged, it is proposed that the
conditions are applied to this consent.  Then the planning authority
shall write to the applicant discharging those same conditions of
23/00532/S42 that were discharged under the MSC applications
submitted under 19/01018/PPP (namely 21/00536/MSC,
21/00912/MSC and 23/00124/MSC). 
8.9 The inclusion of an additional condition, referenced above in paragraph
8.5, will necessitate the re-numbering of subsequent conditions.  The
additional condition would be condition 12. 
9 RECOMMENDATION 
9.1 That planning permission be granted for the following reason: 
The amendment to the conditions of the planning permission in
principle will allow for the delivery of the redeveloped Midlothian
Snowsports Centre, as supported by policy VIS3 of the Midlothian
Local Development Plan 2017.  At the same time, the permission
secures mitigation of the impacts of development on local
infrastructure, in accord with National Planning Framework 4 (NPF4)
Policy 18(b).  Therefore, the proposed amendment is in accordance
with the development plan and there are no material considerations
which outweigh this support for the proposed development. 
Subject to the following conditions: 
Page 95 of 108

Page 96

1.  Notwithstanding that delineated on application drawings/stated in
documents submitted with the application the glamping pods have
now been removed from this application and no consent is hereby
granted for the glamping pods proposed within the site. 
Reason: The glamping pods and the associated light from the
pods and related facilities (such as pathways) are not yet
designed in sufficient detail to enable appropriate assessment of
the impact of the lighting. 
2.  In addition to the conditions attached to this consent, all of the
matters identified in Table 14.2 within Chapter 14 Schedule of
Mitigation of the EIAR shall be complied with and addressed in
the detailed design of the development.  All application(s) for
Matters Specified in Conditions required will refer to this table and
show compliance with the contents, it shall show compliance with
the parameters set out in the EIAR, as well as in relation to the
conditions attached to the consent. 
Reason: To ensure that all of the mitigation measures identified
in the EIAR are addressed in the detailed design of the proposed
development and that the development is well designed and that
it fits within the parameters identified in the EIAR. 
3.  Development shall not begin until an application for approval of
matters specified in conditions regarding the phasing of the
development has been submitted to and approved in writing by
the planning authority. The phasing schedule shall include the
construction of the hotel, leisure facilities, retail provision, the
provision of landscaping, SUDS provision and transportation
infrastructure (including roads, footpaths, cycle trails and car and
coach and bus parking). Development shall thereafter be carried
out in accordance with the approved phasing unless agreed in
writing with the planning authority. 
Reason: To ensure the development is implemented in a manner
which mitigates the impact of the development process on
existing land users and the future occupants of the development
and in the interest of safeguarding the character and amenity of
the area. 
4.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for a
scheme of hard and soft landscaping works has been submitted
to and approved in writing by the planning authority. Details of the
scheme shall include where relevant to the particular phase of
development: 
Page 96 of 108

Page 97

i. existing and finished ground levels and floor levels for all
buildings and roads in relation to a fixed datum. It should
be noted that SEPA recommend building floor levels are
set above surrounding ground levels in order that pooled
water does not cause building problems;
ii.  existing trees, landscaping features and vegetation to be
retained; removed, protected during development and in
the case of damage, restored;
iii.  proposed new planting in communal areas and open
space, including trees, shrubs, hedging and grassed areas;
iv.  location and design of any proposed walls, fences and
gates, including those surrounding bin stores or any other
ancillary structures;
v. schedule of plants to comprise species, plant sizes and
proposed numbers/density;
vi.  programme for completion and subsequent maintenance of
all soft and hard landscaping;
vii.  drainage details and sustainable urban drainage systems
to manage water runoff;
viii.  proposed car park configuration and surfacing;
ix. proposed footpaths and enhanced safety on the access
road for cyclists as well as off road cycle trails; and,
x. proposed cycle parking facilities. 
All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as
the programme for completion and subsequent maintenance (vi).
Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of planting shall
be replaced in the following planting season by trees/shrubs of a
similar species to those originally required. 
Reason: To ensure the quality of the development is enhanced
by landscaping to reflect its setting in accordance with the NPF4
and the Midlothian Local Development Plan 2017. 
5.  With the exception of the works to the access road and main trunk
road junction, Development shall not begin on an individual phase
of development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for the
siting, design and external appearance of all buildings and other
structures has been submitted to and approved in writing by the
planning authority. The application shall include samples of
materials to be used on external surfaces of the buildings; hard
ground cover surfaces; means of enclosure and ancillary
structures. No building shall have an under-building that exceeds
0.5 metres in height above ground level. Development shall
thereafter be carried out using the approved materials or such
alternatives as may be agreed in writing with the planning
authority.
Page 97 of 108

Page 98

Reason: To ensure the quality of the development is enhanced
by the use of quality materials to reflect its setting in accordance
with NPF4 and the Midlothian Local Development Plan 2017. 
6.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for the
site access, roads, footpaths, cycle ways and transportation
movements has been submitted to and approved in writing by the
planning authority. Details of the scheme shall include: 
i. existing and finished ground levels for all roads, footways
and cycle ways in relation to a fixed datum;
ii.  the proposed vehicular, cycle and pedestrian accesses into
the site;
iii.  the proposed roads (including turning facilities), footpaths
and cycle ways including suitable walking and cycling
routes linking the development with the local public
transportation network;
iv.  proposed visibility splays, traffic calming measures, lighting
and signage;
v.  proposed construction traffic access and haulage routes;
vi.  proposed car parking arrangements, including the provision
of electric vehicle parking areas and details of the means of
car charging; and
vii.  a programme for completion for the construction of access,
roads, footpaths and cycle paths. 
Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be agreed in
writing with the planning authority. 
Reason: To ensure the future users of the buildings, existing local
residents and those visiting the development site during the
construction process have safe and convenient access to and
from the site. 
7.  The development shall not begin until a scheme to deal with any
contamination of the site and/or previous mineral workings has
been submitted to and approved by the planning authority. The
scheme shall contain details of the proposals to deal with any
contamination and/or previous mineral workings and include: 
i. the nature, extent and types of contamination and/or
previous mineral workings on the site;
ii.  measures to treat or remove contamination and/or previous
mineral workings to ensure that the site is fit for the uses
hereby approved, and that there is no risk to the wider
Page 98 of 108

Page 99

environment from contamination and/or previous mineral
workings originating within the site;
iii. measures to deal with contamination and/or previous
mineral workings encountered during construction work;
and iv the condition of the site on completion of the
specified decontamination measures. 
8.  On completion of the decontamination/ remediation works
referred to in Condition 7 above and prior to any part of the
development being occupied, a validation report or reports shall
be submitted to the planning authority confirming that the works
have been carried out in accordance with the approved scheme.
No part of the development shall be occupied unless or until the
planning authority have approved the required validation. 
Reason for condition 7 and 8: To ensure that any contamination
on the site is adequately identified and that appropriate
decontamination measures are undertaken to mitigate the
identified risk to site users and construction workers, built
development on the site, landscaped areas, and the wider
environment. 
9.  Development shall not begin until an application for approval of
matters specified in conditions for proposed lighting within the site
including of the car parking areas, service areas, roads and
footpaths have been submitted to and approved in writing by the
planning authority in consultation with Transport Scotland, as
trunk roads authority. The scheme shall be designed to minimise
the spread of light in the night sky. Development shall therefore
be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning
authority. 
Reason: To reduce light pollution to the night sky and to ensure
that there will be no distraction or dazzle to drivers on the trunk
road ad that the safety of the traffic on the trunk road will not be
diminished. It is noted that an initial lighting assessment has been
completed which has indicated that the proposed development
will not cause significant adverse impacts. However it is proposed
by the applicant that a detailed assessment will be completed at
the next stage(s) of the process and this will be submitted to and
approved by the planning authority. 
10.  Development shall not commence on the site until an application
for matters specified in condition has been submitted to and
approved by the planning authority in consultation with Transport
Scotland (as trunk roads authority), for: 
i.  The access onto the A702, as generally illustrated on
SWECO drawing no 65200975/SK009 Rev A and
Page 99 of 108

Page 100

incorporating the recommendations made in the Road
Safety Audit, to a layout compliant with DMRB CD 123, or
other means of access, to a layout standard compliant with
DMRB, as may be approved under separate planning
approval that can also be demonstrated to accommodate
the level of development under consideration; ii. The
proposed means of access shall include details of a
footway to be provided across any part of the existing
access that will not form part of the proposed access, as
appropriate in terms of Condition 11i;
iii.  Any new footway provision shall be constructed to
adoptable standard; and
iv.  The means of relocating/revising the layout of the bus
turning area, together with a method and operational
statement to be approved by the bus operators. This is to
ensure that vehicles entering or exiting the access can
undertake the manoeuvre safely and with minimum
interference to the safety and free flow of traffic on the
trunk road. 
Reason: To minimise interference with the safety and free flow of
the traffic on the trunk road. 
11.  No part of the development shall become operational unless or
until:
i.  The new access has been provided in accordance with the
approved matters specified in conditions, or separate
planning permission, as detailed in Condition 10 and is
available for use by Calderstones and Midlothian
Snowsports Centre;
ii.  All new footways have been provided in accordance with
the matters approved in terms of Condition 10iii;
iii.  The bus turning area has been appropriately
relocated/revised as appropriate in terms of Condition 10iv;
and
iv.  A Construction Management Plan has been submitted to
and approved by the planning authority in consultation with
Transport Scotland which allows works to the private
access road and car parking to commence at the same
time as the new access approved in terms of condition 10i
is under construction. 
Reason: To minimise interference with the safety and free flow of
the traffic on the trunk road. 
12.  Notwithstanding the phasing plan secured by Condition 3 and
approved under application 21/00536/MSC, no part of the
development shall begin demolition or construction unless or until
the proposed temporary traffic management works (including
associated lighting, drainage, road sign, and road markings
Page 100 of 108

Page 101

works) have been constructed to a layout and type (and method)
of construction generally in accordance with Drawing TM-O 70868
TM004, Drawing TM-O 70868 TM004A, and complying with
Transport Scotland’s Requirements of Temporary Traffic
Management, all to the satisfaction of the planning authority, in
consultation with Transport Scotland as the trunk road authority. 
Reason: To minimise interference with the safety and free flow of
traffic on the trunk road. 
13.  Prior to the commencement of the first phase of development
(and any subsequent phase of development if there has been a
change in design which impacts on vehicle numbers), additional
traffic modelling shall be undertaken. The updated modelling
assessment will include the final design of the site access and the
proposed signalised junction to serve the Lothianburn Hotel
development to the north. This assessment shall be submitted to
and agreed in writing with the planning authority after consultation
with the roads authority, Transport Scotland. This modelling will
allow a better understanding of the impact each junction has on
the other. 
Reason: To minimise interference with the safety and free flow of
the traffic on the trunk road. 
14.  Prior to the commencement of any phase of development, a
Public Transport Strategy shall be submitted to and agreed in
writing with the planning authority in consultation with the roads
authority, Transport Scotland, that considers the various public
transport improvements cited in the transport assessment.
Thereafter the approved Public Transport Strategy shall be
implemented at the site. 
Reason: To ensure that the development is adequately served by
public transport services; and to minimise any interference with
the safety and free flow of traffic on the trunk road network. 
15.  Prior to the occupation of any part of the development, a
comprehensive travel plan that sets out proposals for reducing
dependency on the private car has been submitted and approved
in writing by the planning authority, in consultation with Transport
Scotland, as the trunk roads authority.  The travel plan shall
identify the measures to be implemented, the system of
management, monitoring, review, reporting and the duration of
the plan. Once approved the travel plan shall be implemented at
the site. 
Reason: To be consistent with the requirements of NPF4. 
Page 101 of 108

Page 102

16.  Prior to the commencement of any development on the site,
details of the parking strategy within the site shall be submitted for
the approval of the planning authority, in consultation with
Transport Scotland, as the trunk roads authority. Thereafter the
approved parking strategy shall be implemented at the site. 
Reason: To be consistent with the requirements of NPF4 
17.  There shall be no drainage connections to the trunk road drainage
system. 
Reason: To ensure that the efficiency of the existing drainage
network is not affected. 
18.  The proposed development shall be limited to the scale assessed
within the transport assessment. 
Reason: To restrict the scale of the development to that
assessed in relation to the transport assessment. 
19.  Prior to the commencement of any development on the site, a
Construction Traffic Management Plan for each phase of the
development and addressing the relevant construction of the
consultation with the trunk road authority, Transport Scotland. 
Reason: To minimise interference with the safety and free flow of
the traffic on the trunk road; to ensure the safety of pedestrians
and cyclists using the trunk road and adjacent facilities; and to be
consistent with current guidance and best practice. 
20.  The design and layout shown on the Location Plan illustrating
Proposed Development is not approved as the development
shown is illustrative only and is yet to be finalised and will be the
subject of further submission and assessment. 
Reason: The application is for planning permission in principle
and the details delineated within the illustrative site layout plan
prospective images are for illustrative purposes only. 
21.  The proposed retail use on the site shall remain ancillary to the
overall use of the site as a leisure destination and Snowsports
Centre. The retail use shall be limited to a maximum of 1000m2
GIFA. 
Reason: General retail use on this site would not comply with the
Midlothian Local Development Plan, however retail uses which
remains ancillary to the main use of the site as a leisure
destination and Snowsports Centre and of appropriate floor space
is considered acceptable. 
Page 102 of 108

Page 103

22.  Development shall not begin until an application for approval of
matters specified in conditions for a programme of archaeological
works (Evaluation) focussing on those areas unaffected by
woodland and existing buildings, has been submitted to and
approved in writing in by the planning authority. The location of
the areas to be investigated will be subject to agreement in
advance with the planning authority and the archaeology officer.
The approved programme of works shall be carried out by a
professional archaeologist prior to any construction works,
demolition or pre commencement ground works take place unless
otherwise agreed in writing by the planning authority. 
Reason: To ensure this development does not result in the
unnecessary loss of buried archaeological material in accordance
with policies ENV24 and ENV 25 of the Midlothian Local
Development Plan 2017. 
23.  With regard to construction site operations the following noise
levels shall be met - 75 dB LAeq(12hr) (façade), with the best
practicable means (BPM) at all times in accordance with BS5228
guidance. 
The hours of operation during the construction period shall be
restricted to: 
Mon – Fri 08:00 – 19:00 hrs
Saturday 08:00 – 13:00 hrs 
24.  All fixed plant / machinery noise shall comply with the following:- 
Night time (22:00 – 07:00 hrs) NR25 (internal, open window)
Day time (07:00 - 22:00 hrs) - NR30 (internal, open window) 
25.  For commercial / industrial / leisure noise affecting residential use
(existing or proposed) when rated in accordance with BS
4142:2014, shall be less than +5dB above an agreed
representative LA90. 
26.  In relation to all environmental, commercial, leisure sources, the
combined noise level shall comply with the Night Noise
Guidelines for Europe 2009 - 42 dB LAmax (fast) (internal) for the
avoidance of sleep disturbance; 40 dB(A) Lnight (external) as
defined by the Environmental Noise Directive, to protect from the
long term adverse effects of night noise. The Midlothian Council
design standards in relation to anonymous noise sources for
residential uses are as follows:
- 55 dB LAeq(1hr) for daytime external garden amenity
- 35 dB LAeq(1hr) for daytime internal living apartment
- 30 dB LAeq(15min) for night time internal living apartment
(excluding fixed plant controlled by NR25 or NR20 if tonal). 
Page 103 of 108

Page 104

Reasons for conditions 23 to 26: To ensure noise for the site
during the construction and operational period do not significantly
adversely impact on the nearby sensitive receptors. 
27.  In relation to dust generation, the Air Quality Assessment states
that with no mitigation during the construction phase, the
significance of dust soiling and PM10 is, at worst, medium
adverse. To minimise impact on sensitive receptors it is
recommended that a dust management plan is submitted to and
approved in writing by the planning authority and thereafter the
approved dust management plan is implemented in full during the
construction period. 
Reason for condition: Further assessment in relation to Air
Quality and dust generation during the construction period in
order to satisfactorily mitigate the potential impact of the
development. 
28.  There shall be no external storage of materials, packaging or
other items out with storage or other buildings, unless approved
by the planning authority along with appropriate screening. 
Reason: Given the prominence of the site and the provision of
storage buildings on the site the need for further stage on the site
should be minimised and provided only where absolutely
necessary and where appropriate screening is provided. 
29.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for a
Construction Environment Management Plan (CEMP) has been
submitted to and approved in writing by the planning authority.
The CEMP shall include: 
i.  signage for the construction traffic, pedestrians and other
users of the site; ii. controls on the arrival and departure
times for the construction vehicles and for site workers; 
iii.  details of piling methods (if employed); 
iv.  details of earthworks; 
v.  control of emissions strategy; 
vi.  a dust management plan strategy; 
vii.  waste management and disposal of material strategy;
viii.  a community liaison representative will be identified to deal
with the provision of information on the development to the
local community and to deal with any complaints regarding
construction on the site;
ix.  prevention of mud/debris being deposited on the public
highway; and,
x.  material and hazardous material storage and removal. 
Page 104 of 108

Page 105

Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be approved in
writing with the planning authority. 
Reason: In order to control the construction activity on the site,
ensure environmental impact during the construction period is
acceptable and to ensure appropriate mitigation is in place. The
applicant has submitted an outline CEMP in support of the
application at Chapter 14 of the EIAR. 
30.  Permitted development under Class 40, section (1) (e) of the
Town and Country Planning (General Permitted Development)
(Scotland) Order 1992 as amended, replaced or superseded by
any subsequent regulation is expressly excluded within the site
and no electricity substation shall be erected within the site unless
details of its position and appearance have been submitted to and
approved in writing by the planning authority. 
Reason: To ensure that any substation is unobtrusive and not
unduly close to any occupied building. 
31.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for the
provision and use of electric vehicle charging stations has been
submitted to and approved in writing by the planning authority.
Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be approved in
writing with the planning authority. 
Reason: To ensure the development accords with the
requirements of policy TRAN5 of the Midlothian Local
Development Plan 2017. 
32.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions for a
scheme of sustainability/biodiversity for the site, including the
provision of bricks and boxes for bats and swifts, and biodiversity
friendly landscaping throughout the development has been
submitted to and approved in writing by the planning authority.
Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be approved in
writing with the planning authority. 
Reason: To ensure the development accords with the
requirements of policy DEV5 of the Midlothian Local Development
Plan 2017. 
Page 105 of 108

Page 106

33.  Development shall not begin on an individual phase of
development (identified in compliance with condition 3) until an
application for approval of matters specified in conditions setting
out details, including a timetable of implementation, of superfast
broadband has been submitted to and approved in writing by the
planning authority. The details shall include delivery of superfast
broadband prior to the occupation of each commercial building.
The delivery of superfast broadband shall be implemented as per
the approved details. 
Reason: To ensure the quality of the development is enhanced
by the provision of appropriate digital infrastructure. 
34.  Further survey work and associated mitigation measures in
relation to waste water and the potential impact on Groundwater
Dependent Terrestrial Ecosystems shall be submitted to and
approved in writing by the planning authority in consultation with
SEPA. 
Reason: To ensure groundwater dependent terrestrial
ecosystems are not significantly adversely impacted by the
development. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:     17 November 2023
Application No:    23/00532/S42
Applicant:   Midlothian Council
Agent:              Gregor Southall, Montagu Evans
Validation Date:  17 August 2023
Contact Person:  Martin J Patrick 
Email:     martin.patrick@midlothian.gov.uk
Background Papers: 19/01018/DPP
Page 106 of 108

Page 107

Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. AC0000811376 (2023)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Planning Service
Place Directorate
Section 42 application to amend condition 11 planning
permission 19/01018/PPP at Midlothian Snow Sports Centre,
Biggar Road, Edinburgh, EH10 7DU
File No: 23/00532/S42
Scale:1:6,000 ±Page 107 of 108

Page 108

Page 108 of 108