Democracy Spraffa

Agenda Document Pack - Planning Committee - 16/05/2023

Midlothian Council · 16 May 2023
Back to Planning Committee — 16 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Planning Committee 
Venue:  Council Chambers, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 16 May 2023 
Time:  13:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 86

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of meeting of 28 March 2023 submitted for approval 3 - 10 
5          Public Reports
5.1 Discretionary Charging for the Planning Service - Report by Chief
Officer Place
11 - 22
5.2 Elected Member Workshops on National Planning Framework No.
4 And Midlothian Local Development Plan 2 and an Update on
the Engagement - Report by Chief Officer Place
23 - 32
5.3 Tree Preservation Order - Cousland - Report by Chief Officer
Place
33 - 80
5.4 Pre-Application Report - Erection of Community_Education
Campus and Associated Works at Mayfield Nursery School -
Report by Chief Officer Place
81 - 86 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 13th of June 2023. 
Page 2 of 86

Page 3

Minute of Meeting 
Planning Committee 
Date Time Venue
Tuesday 28 March 2023 1.00 pm Council Chambers,
Midlothian House   
Present: 
Councillor Imrie (Chair) Councillor Alexander
Councillor Bowen Councillor Cassidy
Councillor McEwan Councillor McKenzie
Councillor McManus Councillor Milligan
Councillor Parry Councillor Pottinger
Councillor Russell Councillor Scott
Councillor Smaill Councillor Virgo
Councillor Winchester 
In Attendance: 
Derek Oliver Chief Officer Place
Peter Arnsdorf Planning, Sustainable Growth and Investment Manager
Alan Turpie Legal and Governance Manager
Andrew Henderson Democratic Services Officer 
Planning Committee
Tuesday 16 May 2023
Item No: 4.1 
Page 3 of 86

Page 4

1. Apologies
Apologies for absence were received from Councillor Curran, Councillor McCall,
Councillor McManus and Councillor Winchester. 
2. Order of Business
The order of business was as set out in the Agenda.
3. Declarations of interest 
None 
4. Minutes of Previous Meetings 
The minute of the meeting of 28 February 2023 was submitted and approved as
a correct record. 
Councillor Pottinger made reference to the decision to reinstate the footpath at
Easthouses Primary School. Peter Arnsdorf confirmed that this had been
included as part of the plan to reinstate the school. 
5. Reports 
Agenda No Report Title Submitted by:
5.1 Tree Preservation Order, Bilston Chief Officer Place
Outline of report and summary of discussion
This report seeks the Committee’s approval to confirm a Tree Preservation Order
(TPO) 1 of 2022 issued on 1 December 2022 for eight individual trees (T1 - T8) and
two groups of trees (G1 and G2) at Pentland Lea and The Firs, Seafield Road,
Bilston. 
A brief discussion ensued in relation to Tree Preservation Orders in which the
Planning, Sustainable Growth and Investment Manager clarified matters in relation
to procedural issues and confirmed it is the land owners responsibility to maintain
trees on their land and to also comply with a Tree Preservation Order. 
Decision
The Committee agreed the recommendations as detailed in the Report.
Action
Planning, Sustainable Growth and Investment Service Manager 
Page 4 of 86

Page 5

Agenda No Report Title Submitted by:
5.2 Prosecution for non-compliance with
Enforcement Notice, 1 Laurel Bank Road,
Mayfeild
Chief Officer Place
Outline of report and summary of discussion
This report relates to the non-compliance with the requirements of an enforcement
notice served by the Council pursuant to Section S127 of the Town and Country
Planning (Scotland) Act 1997, as amended, with regard the erection of a building
comprising a garage and sun room at 1 Laurel Bank Road, Mayfield.
Decision
a) Planning Committee noted the contents of the report; and 
b) Instructed Council 0fficers to take Direct Action to refer the case to the Crown
Office and Procurator Fiscal Service for consideration to be given to
prosecutorial action in relation to the parties who have breached the
enforcement notice, pursuant to Section 136 of the Town and Country
Planning (Scotland) Act 1997. The maximum penalty on successful
prosecution is a fine of up to £50,000 per offence.
Action
Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.3 Prosecution for non-compliance with
Enforcement Notice, Edgehead Farmhouse,
Pathhead
Chief Officer Place
Outline of report and summary of discussion
This report relates to the non-compliance with the requirements of an enforcement
notice served by the Council pursuant to Section 127 of the Town and Country
Planning (Scotland) Act 1997, as amended, with regard the use of clear glazing
rather than opaque glazing in windows forming part of an approved extension at
Edgehead Farmhouse, Edgehead Road, Edgehead, Pathhead.
Decision
After careful consideration Planning Committee agreed; 
a) To note the contents of the report; and 
b) Instructed Council Officers to take Direct Action to refer the case to the
Crown Office and Procurator Fiscal Service for consideration to be given to
prosecutorial action in relation to the parties who have breached the
enforcement notice, pursuant to Section 136 of the Town and Country
Page 5 of 86

Page 6

Planning (Scotland) Act 1997. The maximum penalty on successful
prosecution is a fine of up to £50,000 per offence.
Action
Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.4 Listed Building Enforcement Notice, 130 High
Street, Dalkeith 
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report is to advise the Committee of a listed building
enforcement notice appeal decision with regard the removal of sixteen singled
glazed, timber framed, sash and case windows, and the installation of sixteen
double glazed, uPVC framed, tilt and turn windows in the front, rear and side
facades at 130 High Street.
Decision
Planning Committee noted the enforcement notice appeal decision with regard to
the removal of sixteen singled glazed, timber framed, sash and case windows, and
the installation of sixteen double glazed, uPVC framed, tilt and turn windows in the
front, rear and side facades at 130 High Street, Dalkeith.
Action
Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.5 NPF4 Impact on Outstanding Planning
Applications.
Chief Officer Place
Outline of report and summary of discussion
The purpose of this report is to seek the Committee’s agreement that planning
applications, considered prior to the adoption of National Planning Framework No.
4 (NPF4), that have a ‘minded to grant’ decision and are subject to the completion
of a planning obligation are progressed to conclusion without referral back to the
Committee or Local Review Body (LRB). 
A brief discussion ensued in relation to the report, Peter Arnsdorf clarified that all
new applications would be subject to NPF4 and confirmed that should developers
wish to remix a development it the application would be assessed under NPF4.
Decision
Planning Committee agreed that those planning applications, considered prior to
the adoption of NPF4, that have a ‘minded to grant’ decision as set out in tables 1
Page 6 of 86

Page 7

and 2 of the report are progressed to conclusion without being referred back to the
Committee or the Local Review Body.
Action
Planning, Sustainable Growth and Investment Manager 
Agenda No Report Title Submitted by:
5.6 Land between Deanburn and Mauricewood
Road, Penicuik (22.00253.DPP) 
Chief Officer Place
Outline of report and summary of discussion
The planning application is for the erection of 35 dwellinghouses on land between
Deanburn and Mauricewood Road Penicuik. The application proposes an
amendment to the house types previously granted planning permission
(17/00068/DPP) for part of the wider North West Penicuik development site.
Decision
After careful consideration Planning Committee agreed; 
a) That the Planning, Sustainable Growth and Investment Manager confirm that
the sustainable drainage system would not impact local flooding; and 
b) That planning permission be granted for the following reason: 
The proposed development site will contribute to the sustainable delivery of
housing in compliance with the policies of National Planning Framework 4 and
is allocated for housing in the Midlothian Local Development Plan 2017
(MLDP) where there is a presumption in favour of an appropriate form of
development. Furthermore, the principle of residential development on the site
has been established by the grant of planning permission 17/00068/DPP. The
proposed detailed scheme of development in terms of its layout, form, design
and landscape framework is acceptable and as such accords with
development plan policies. The presumption for development is not
outweighed by any other material considerations. 
Subject to: 
a. The prior amendment/modification of the planning obligation associated with
planning permission 17/00068/DPP (and any other amendment planning
applications) to ensure it covers the development approved under this
application (22/00253/DPP). and 
b. the  conditions as set out in the report.
Action
Planning, Sustainable Growth and Investment Manager
Page 7 of 86

Page 8

Agenda No Report Title Submitted by:
5.7 Land East, North East of Auchendinny
(22.00848.DPP) 
Chief Officer Place
Outline of report and summary of discussion
The application is for the erection of 395 dwellings, formation of access road, car
parking, landscaping and associated works on land east/north east of Auchendinny,
The Brae, Auchendinny, Penicuik. 
A discussion ensued amongst members with regard to road access. The Planning,
Sustainable Growth and Investment Manager confirmed that the northern access
was for 345 units whilst the remaining 50 properties would be accessed from Firth
Road. Members then took the opportunity to express concern in relation to
paragraphs 8.8.3, 8.8.4 and 8.8.5 of the report. Peter Arnsdorf clarified that the
local plan identified the site as local housing with a primary school and that when
council approved the legal agreement it gave the council a year to take up the land
for the school and that the council had not taken up this option, the second
paragraph outlining that the land is vacant should the council wish to pursue this
further. The Planning, Sustainable Growth and Investment Manager further clarified
that with regard to active travel, developer contributions are being used to tie in with
road infrastructure improvements in addition to discussions with bus companies to
assess options. 
In response to comments regarding the possible use of modular housing for
affordable developments, The Planning, Sustainable Growth and Investment
Manager confirmed that this would be a possibility. 
After further discussions, Councillor Parry, seconded by Councillor Cassidy moved
to reject the application due to the fact that under paragraph 8.8.3 the report
referenced that the plan was part of the MLDP as site HS20 and that under section
8.8.5 reference was made to the use of the possible school site for landscaping,
highlighting that no decision was taken by council to reject the building of a school
on the site. After further discussion, Councillor Imrie, seconded by Councillor Smaill
moved to accept the recommendations subject to the removal of paragraphs 8.8.4
and 8.8.5. Thereafter, Councillor Parry and Councillor Cassidy agreed to the
amended the initial motion to reflect the removal of paragraphs 8.8.4 and 8.8.5 from
the report with the caveat that sustainable public transport systems be taken into
account.  
Decision
After careful consideration Planning Committee agreed; 
a) Not to consider  paragraphs 8.8.4 and 8.8.5 in assessing the planning
application; 
That planning permission be granted for the following reason:
The proposed development site will contribute to the sustainable delivery of
housing in compliance with the policies of National Planning Framework 4 and
the vast majority of the site is allocated for housing in the Midlothian Local
Page 8 of 86

Page 9

Development Plan 2017 (MLDP) forming part of the Council’s committed housing
land supply and where there is a presumption in favour of an appropriate form of
development. The remainder of the site is located within the Countryside where
the complimentary recreational development proposed (multi user cycle path) is
of a scale and nature appropriate to the character of this area. This presumption
in favour of development is not outweighed by any other material conditions. 
Subject to: 
a.  The prior signing of a planning obligation to secure:
•  A financial contribution towards primary education capacity;
•  A financial contribution towards secondary education capacity;
•  A financial contribution towards the A701 realignment and A702 link
road project/public transport;
• A financial contribution towards off site children’s play and open
space improvements;
•  Long term maintenance arrangements for communal open space
within the site; and
•  The provision of affordable housing (25%). The legal agreement shall
be concluded within six months. If the agreement is not concluded
timeously the application will be refused.
b.  The conditions as set out in the report.
Action
Planning, Sustainable Growth and Investment Manager 
6. Private Reports 
No items for discussion 
7. Date of Next Meeting 
The next meeting will be held on Tuesday 16 May 2023 at 1.00pm 
The meeting terminated at 2.00 pm 
Page 9 of 86

Page 10

Page 10 of 86

Page 11

DISCRETIONARY CHARGING FOR THE PLANNING SERVICE
Report by Chief Officer Place 
1 PURPOSE OF REPORT
1.1 The purpose of the report is to inform the Committee of The Town and Country
Planning (Fees for Applications) (Scotland) Regulations 2022, which came into
effect on 1 April 2022, and to seek approval for new Planning Service
discretionary fees to be applied for services and a surcharge to be applied to
retrospective planning applications. 
2 BACKGROUND
2.1 The Town and Country Planning (Fees for Applications) (Scotland)
Regulations 2022, which came into effect on 1 April 2022, increased the fees
which were required in connection with planning applications and introduced
the opportunity to apply discretionary charging for services provided by the
planning authority.
2.2 At its meeting on 21 March 2023 the Council agreed to introduce discretionary
charging for the Planning Service.  The discretionary charging for the Planning
and Building Services was estimated to generate £16,000 for 2023/24
(£10,000 of which will be from the Planning Service). 
2.3 Since the 2022 Regulations were published, the majority of planning
authorities across Scotland have been considering their position in terms of
charging and many planning authorities have already introduced discretionary
charging.  In arriving at a level for discretionary charging a survey of the
charges imposed across the country has been conducted and likely costs of
the services provided by the planning authority have been calculated.
2.4 The Regulations require the preparation of a Planning Fees Charter.  The
Planning Fees Charter which has been prepared, is attached to this report as
Appendix A, combines the statutory planning application fees, existing charges
for various services and the proposed discretionary charging schedule.  Based
on the survey work the planning authority has conducted the proposed
discretionary charging schedule is fair and proportionate and covers the areas
set out in sections 3 of this report.
Planning Committee
Tuesday  16 May 2023
Item No: 5.1
Page 11 of 86

Page 12

3 PLANNING FEES CHARTER 
Pre-Application Enquiries 
3.1 The provision of pre-application advice is a valuable service allowing planners
to identify the acceptability of a proposed development scheme at an early
stage (potentially saving developers resource); identify the appropriate
supporting information to front load a planning application; provide assurance
to applicants; and, assist in reducing determination timescales.  It is a service
which the planning authority has provided free of charge for many years,
effectively subsidising the development industry. 
3.2 There is a risk that in introducing charges for pre-application enquiries results
in some potential applicants no longer using this service.  This could result in
some applications taking longer to determine and even potentially more
notices of refusal being issued.  However, the status quo of not charging for
this service is unsustainable and the fees have been set at such a level that
they make up a very small proportion of the overall development costs. 
3.3 The fees proposed for pre-application enquiry charging and the level of service
provided is set out in the Planning Fees Charter.  The level of charging has
been set after survey work, including examining what other authorities are
currently charging and based on the likely time an officer will need to dedicate
to a particular case.  The proposed fees represent a very small proportion of
the overall development costs, but are high value. 
3.4 The Planning Fees Charter also sets out what needs to be submitted with the
pre-application enquiry and also the service standard that the planning
authority will aim to provide. 
3.5 The Planning Fees Charter also includes certain exceptions to pre-application
charging which includes planning applications made by disabled people for
alterations to their principal residence and applications made by community
councils where the application is intended for community benefit.  In addition,
in an attempt to encourage discussion regarding proposals for carbon
reducing/renewables technologies, such as solar panels, on domestic
properties it is proposed to exempt those types of developments from pre-
application charging, where they are the sole development proposal in the
scheme. 
Non-Material Variations 
3.6  It is quite common for developers to request changes to development
schemes which have been through the planning process and have been
approved.  In these cases the developer will request that the change to the
scheme be considered as a non-material variation.  The planning authority
has, until now, dealt with these requests without requiring a fee – some
changes can be progressed under this non-material variation route where as
other more material changes will need a new planning application. 
Page 12 of 86

Page 13

3.7  The Regulations provide that an authority may introduce a charge of £200 for
each request for a non-material variation to a planning permission under
Section 64 of the Town and Country Planning (Scotland) Act 1997. The
Planning Fees Charter sets out that a charge of £200 is applied for requests
for non-material variations as set in the Regulations. 
Compliance with Conditions and Discharge of a Conditions 
3.8  The Regulations state that an authority may introduce a fee of £100 to provide
written confirmation that a condition or conditions within the same application
have been complied with.  It is therefore recommended that this fee of £100 is
levied for requests to provide written confirmation that a condition has been
complied with, as set in the Regulations.  The fee would apply to each request
made and can cover more than one planning condition on the same planning
consent.  Each separate request will attract a new fee. 
Retrospective Application Surcharges 
3.9  The Regulations allow the introduction of a surcharge for applications for
planning permission where the application relates to development carried out
without permission.  This allows for a surcharge of up to 25% over and above
the normal fee that would have been required for the development concerned. 
3.10  It is recommended that a surcharge of 25% is applied to the fee for such
applications submitted.  This will be applied where the development has been
completed and also where it has been started without the appropriate planning
permission, but is not yet complete.  It is hoped that he introduction of a
surcharge will reduce the number of unauthorised developments that are
carried out without the necessary planning permission. 
Section 50 Licence Certificate 
3.11  Many planning authorities already charge for this administration service, where
a ‘Planning Certificate’ is provided to applicants applying for a licence to
ensure all the appropriate planning permissions are in place. The minor £60
fee is proportionate and covers the planning authority’s administration costs. 
Other Charges in the Planning Fees Charter 
3.12 A range of other, already existing, charges including fees for high hedge
applications, advertising planning applications, monitoring planning
obligations, property searches and issuing property enquiry certificates are set
out in the Planning Fees Charter in the interests of completeness and clarity. 
4 RESOURCE IMPLICATIONS 
4.1 The Planning Service spends a considerable amount of time processing pre-
application enquiries, non-material variations and requests for written
confirmation of compliance/discharge of conditions at no additional charge.
Considering the financial context and current demand for this service there is a
Page 13 of 86

Page 14

need to take a commercial approach for introducing service charges for pre-
application enquiries, non-material variations and requests for written
confirmation of compliance/discharge of conditions.
4.2 In charging for the abovementioned services it will mean that customers will
rightly expect a paid-for service.  This may result in re-balancing resources to
provide those services whilst processing planning applications and
progressing the review of its local development plan.  The planning authority
will monitor planning application performance to see if the implementation of
Planning Fees Charter impacts on other parts of the wider Planning Service.
4.3 The planning authority’s back office systems and processes will need to be
updated to allow for the implementation of the Planning Fees Charter, if
approved. The Planning Fees Charter will need to be made available on the
Council’s website.
5 RECOMMENDATION 
5.1 The Committee is recommended to approve the Planning Fees Charter.
Peter Arnsdorf 
Planning, Sustainable Growth and Investment Manager
Date:   9 May 2023   
Contact Person:  Peter Arnsdorf
peter.arnsdorf@midlothian.gov.uk
Background Papers:  The Town and Country Planning (Fees for Applications)
(Scotland) Regulations 2022; and
Planning Circular 2/2022 The Town and Country Planning
(Fees for Applications) (Scotland) Regulations 2022
Page 14 of 86

Page 15

Planning Fees Charter
The Town and Country Planning (Fees for Applications) (Scotland) Regulations 2022 set out the level of fees required as part of the
submission of planning applications and other associated applications.
These Regulations replace the Town and Country Planning (Fees for Applications and Deemed Applications) (Scotland)
Regulations 2004.  They also introduce some additional categories of payment and enable the planning authority to charge
discretionary fees for some services, to reduce or waive fees in certain cases and to apply a surcharge for retrospective
applications.  The Regulations require us, as planning authority, to set out what we will charge for these services, when and by how
much fees will be reduced and clarify the level of surcharges applied.  This information is set out below.
Planning applications and associated submissions will not be considered 'valid' until the fee has been received in full.  Fees will be
checked at the final point of validation, rather than the point of submission, as changes during the validation process can affect fees
payable.  Planning applications, discretionary service requests and associated submissions may be returned if the required fee is
not received within five working days of the submission being lodged.
Ways to Pay
Cheque – Please make cheques payable to ‘Midlothian Council’ and write the application reference number (**/*****/***), or the
address of the application site and ‘planning application’ or ‘pre-application enquiry’ on the back of the cheque.
Card – Please call (0131) 271 3147.  If paying by card please ensure you also provide us with the planning application reference
number and the site address.  Please note this telephone line is only staffed on a Monday, Wednesday or Friday.
BACS - Sort code: 83-17-26   Account number: 00128568    Once a payment is made please email
revenues.cash.collection@midlothian.gov.uk  with confirmation of the planning application reference number, cash amount and the
customer/company name.  Please copy dutyplanningofficer@midlothian.gov.uk into the email.
Appendix A
Page 15 of 86

Page 16

Fees for Planning Applications
The fees associated with the submission of planning applications are set out in The Town and Country (Fees for Applications)
(Scotland) Regulations 2022 (or subsequent amendments) and can be found via: 
The Town and Country Planning (Fees for Applications) (Scotland) Regulations 2022 (legislation.gov.uk)
Pre-Application Advice Charging
Below is the scale of fees related to pre-application enquiries:
Category Definition Charge Standard Service
Level
Additional
service
options
Required information
Householder
(including change
of use of land to
private garden
ground); and
advertisement and
signage proposals
£80 + VAT
(£96)
Unaccompanied site
visit to the site by the
case officer;
consultation with
relevant internal
consultees; and a
written response
provided within 30
working days based
on the information
provided, unless an
alternative timescale
is agreed.
• Completed pre-application
form
• Location plan with red line;
• Block plan existing and
proposed;
• Existing/proposed elevations;
• Existing/proposed floor plans;
• Draft outline design/access
statement.
* all drawings to be provided at a
scale to show the extent of the
proposed development.
Small Local Scale
development
• 1 to 10 residential
units;
• Up to 999 sqm of
gross floor space;
£150 +
VAT
(£180)
Unaccompanied site
visit to the site by the
case officer;
consultation with
relevant consultees;
• Completed pre-application
form
• Location plan with red line;
• Block plan existing and
proposed;
Page 16 of 86

Page 17

• Agricultural buildings;
• Glasshouses and
polytunnels
• Other development
sites up to 0.49ha. 
and a written
response provided
within 30 working
days based on the
information provided,
unless an alternative
timescale is agreed.
• Existing/proposed elevations;
• Existing/proposed floor plans;
• Draft outline design/access
statement. 
* all drawings to be provided at a
scale to show the extent of the
proposed development.
Larger Local
Scale
• 11 to 49 residential
units;
• Between 1000 sqm
and 9999 sqm of gross
floor space;
• Other development
sites above 0.5ha but
below major scale
development. 
£500 +
VAT
(£600)
Unaccompanied site
visit to the site by the
case officer;
consultation with
relevant consultees;
and a written
response provided
within 35 working
days based on the
information provided,
unless an alternative
timescale is agreed. 
• Completed pre-application
form
• Location plan with red line;
• Block plan existing and
proposed;
• Existing/proposed elevations;
• Existing/proposed floor plans;
• Draft outline design/access
statement. 
* all drawings to be provided at a
scale to show the extent of the
proposed development.
Major Scale Major scale development
as set out in The Town
and Country Planning
(Hierarchy of
Developments)(Scotland)
Regulations 2009
£1200 +
VAT
(£1440)
Unaccompanied site
visit to the site by the
case officer;
consultation with
relevant consultees;
and a written
response provided
within 35 working
days based on the
information provided,
Up to two
meetings
with case
officer
£500;
£200 for
each
meeting
after the
first two.
• Completed pre-application
form
• Location plan with red line;
• Block plan existing and
proposed;
• Existing/proposed elevations;
• Existing/proposed floor plans;
• Draft outline design/access
statement. 
Page 17 of 86

Page 18

unless an alternative
timescale is agreed.
* all drawings to be provided at a
scale to show the extent of the
proposed development.
Listed Buildings Proposals for alterations
to listed buildings not
covered by the
categories above.
£80 + VAT
(£96)
Unaccompanied site
visit to the site by the
case officer (access
may be required);
consultation with
relevant consultees;
and a written
response provided
within 30 working
days based on the
information provided,
unless an alternative
timescale is agreed. 
• Completed pre-application
form
• Location plan with red line;
• Block plan existing and
proposed;
• Existing/proposed elevations;
• Existing/proposed floor plans;
• Draft outline design/access
statement. 
* all drawings to be provided at a
scale to show the extent of the
proposed development.
Section 75
modifications 
£80 + VAT
(£96)
Consultation with
relevant consultees;
and a written
response provided
within 35 working
days based on the
information provided,
unless an alternative
timescale is agreed. 
• Completed pre-application
enquiry form. 
Page 18 of 86

Page 19

Exemptions from the above Pre-Application Enquiry Charging 
Pre-application enquiries to alter or extend an existing dwellinghouse, or to carry out operations within the curtilage of an existing
dwellinghouse, are exempt from payment of a fee if the planning authority is satisfied that the proposed development is intended to
improve access, safety, health or comfort for a disabled person who is living in the house as their principal residence. 
Community Councils - pre-application enquiries from a community council are exempt from payment of a fee if the planning
authority is satisfied that the proposed development is intended solely for community benefit. 
Pre-application enquiries for local scale renewable energy projects are exempt.  This exemption does not apply if the proposals
form part of a wider development proposal. 
Pre-application enquiries that are part of a collective or wider Planning Service funding arrangement are exempt – the Planning
Service can advise applicants if there proposal falls within this exemption. 
Do I need planning permission enquiries are not classed as pre-application enquiries and are therefore exempt. 
Non-Material Variations 
A fee of £200 for each request for a non-material variation to a planning permission under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Condition Compliance Fee (excludes AMSC applications relating to planning permission in principle) 
A fee of £100 to provide written confirmation that a condition has been complied with.  An applicant may wish to seek written
confirmation of compliance with more than one condition pertaining to the same application within a submitted request, which will
result in a single fee of £100 being payable.  Each subsequent written confirmation request pertaining to the same application will
attract a further fee of £100.  Where an enquiry relates to a householder development, which would benefit from planning
application fee exemption under Reg 7 (means of access, etc. for disabled persons) it will be exempt from this fee. 
Page 19 of 86

Page 20

Requests that are part of a collective or wider Planning Service funding arrangement are exempt – the Planning Service can advise
applicants if there proposal falls within this exemption. 
Discharge of Conditions (excludes AMSC applications relating to planning permission in principle) 
A fee of £100 to provide written confirmation that a condition can be discharged.  Applicants will require to seek written confirmation
of the discharge of conditions related to a grant of planning permission or other form of consent.  Each submitted request will result
in a single fee of £100 being payable.  Each subsequent written request pertaining to the same application will attract a further fee
of £100.  Where a request relates to a householder development, which would benefit from planning application fee exemption
under Reg 7 (means of access, etc. for disabled persons) it will be exempt from this fee. 
Requests that are part of a collective or wider Planning Service funding arrangement are exempt – the Planning Service can advise
applicants if there proposal falls within this exemption. 
Retrospective Applications Surcharge 
A surcharge will be applied to applications for planning permission where the application relates to development carried out or
commenced without permission (Section 33 of the Town and Country Planning (Scotland) Act 1997).  The surcharge will be applied
both where development is complete, and where development has commenced but has not yet been completed.  The fee shall be
calculated for the development in accordance with the Regulations and then a surcharge of 25% will be added. (If an officer of the
Planning Authority sees that development has commenced on a development while conducting a site visit the application will be
made invalid until the additional fee is paid). 
High Hedge Applications 
High Hedge applications attract a fee of £300.  However, the difference between cost of work involved in assessment and the £300
fee will be refunded if less than £300.  Please note that there is no pre-application advice service in relation to High Hedge
applications. 
Page 20 of 86

Page 21

Charge for Advertising a (non-EIA) Application 
Where applications have to be advertised in the local press on account of neighbour notification, bad neighbour development or
potential departure from the development plan a charge of £80 will be required to cover the planning authority’s costs.  The
application will not be determined until the advert fee has been settled. 
Charge for Advertising an EIA Application 
The advert fee for EIA applications is calculated based on the space required in the newspaper. 
Section 50 Licence Applications/Certificate 
A section 50 license application fee will be set at £60. 
Property Search 
A property search fee will be set at £60. 
Property Enquiry Certificate 
A property enquiry certificate fee will be set at £116. 
Page 21 of 86

Page 22

Monitoring Planning Obligations 
Council agreed in 2016 that the planning authority would charge for monitoring obligations. 
Charges for the monitoring and management of Planning Obligations are as follows: 
Form of Development Charge 
Householder applications or local applications relating to the erection of a single dwellinghouse.  £105+VAT (=£126) 
Local developments relating to more than a single dwellinghouse where the planning obligation
relates only to the payment of financial contributions. 
£525+VAT (=£630) 
Local developments where the planning obligation relates to the payment of financial contributions
and the provision of affordable housing and/or other infrastructure. 
£1050+VAT (=£1260)
Major development where the planning obligation relates only to the payment of financial
contributions 
£1575+VAT (=£1890) 
Major developments where the planning obligation relates to the payment of financial
contributions and the provision of affordable housing and/or other infrastructure. 
£2100+VAT (=£2520) 
National and Major developments where the planning obligation relates to the payment of
financial contributions and the provision of affordable housing and/or other infrastructure over a
period of 10 years or more.
£5250+VAT (=£6350) 
Page 22 of 86

Page 23

Planning Committee
Tuesday  16 May 2023
Item No: 5.2
ELECTED MEMBER WORKSHOPS ON NATIONAL PLANNING
FRAMEWORK NO. 4 AND MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
AND AN UPDATE ON MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
ENGAGEMENT
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to set out the date for the upcoming elected
member workshops on National Planning Framework No.4 (NPF4) and
the Midlothian Local Development Plan 2 (MLDP2).  The report also
provides an update on MLDP2 work streams and seeks approval of an
Engagement Plan. 
2 BACKGROUND
2.1 At its meeting of 28 February 2023 the Committee considered a report
on the National Planning Framework No.4 (NPF4) and formally
launched its review of its local development plan in accordance with the
following indicative timescale:
Indicative Timescale for Production of MLDP2
Key Stage Approval
Body
Timescale
1 Formal commencement of MLDP2 Planning
Committee
February
2023
2 Invitations to community groups to prepare
Local Place Plans (LPPs)
Planning
Committee
March 2023
3 Widespread engagement to inform
production of the MLDP2 Evidence Report*
Planning
Committee
2023
4 Approval of MLDP2 Evidence Report for
submission to Scottish Ministers “Gate
Check”
Full Council January
2024
5 Reporting the results of/feedback from
Scottish Ministers “Gate Check” of the
MLDP2 Evidence Report
Planning
Committee
From March
2024
6 Approval of MLDP2 Proposed Plan for
publication for representations (a 12 week
formal consultation period)
Full Council March/April
2025
7 Approval of the MLDP2 Draft Delivery
Programme for publication 
Full Council March/April
2025
Page 23 of 86

Page 24

8 Approval of MLDP2 Proposed Plan for
submission to Scottish Ministers – this may
include a Modification Report making
changes to the Proposed Plan following
representations received
Full Council December
2025
9 Examination into unresolved issues from
representations received on MLDP2
Proposed Plan
N/A From March
2026
10 Report of Examination Received from the
Reporter from the Directorate for Planning
and Environmental Appeals (DPEA)
appointed by Scottish Ministers
N/A September
2026
11 Adoption of MLDP2 Full Council  December
2026
12 Adoption of MLDP2 Delivery Programme Planning
Committee
March 2027 
2.2 Following the Committee’s decision on the 28 February 2023 the formal
commencement of MLDP2 has been undertaken in accordance with
stage 1 of the timeline and invitations to community groups to prepare
Local Place Plans in accordance with stage 2 of the timeline has been
undertaken.  The Planning Service is now undertaking widespread
engagement to inform the production of MLDP2 in accordance with
stage 3 of the timeline.  The plan for this engagement is set out in an
Engagement Plan attached to this report as Appendix A. 
2.3 The stated Committee report set out the following:
• An update on the adoption of NPF4;
• The implication of NPF4 in the assessment of planning
applications;
• The new housing targets for Midlothian set by NPF4;
• An overview of the MLDP2 process, key issues for MLDP2 and
the MLDP2 next stages; and
• The Development Plan Scheme for Midlothian No.15 
3 ELECTED MEMBER WORKSHOPS 
3.1 As part of the engagement on MLDP2, it was agreed that workshops
with elected members be arranged.  The purpose of these workshops is
to inform elected members of the implications of NPF4 for Midlothian
and to start capturing elected members ambitions and ideas for MLDP2. 
3.2 A present two sets of workshops are planned - the first in May 2023 and
the second in September 2023.  To maximise the opportunity for
engagement with elected members, two sessions, split on a ward basis,
are being held for each workshop set.  The first set of workshops are
being held on 29 May 2023 (invites have been issued) and the second
set will be in September on a date to be confirmed.  On 29 May 2023
there will be a morning workshop session for Dalkeith, Midlothian East
and Bonnyrigg Ward elected members.  In the afternoon of 29 May
2023 there will be a workshop for Midlothian West, Midlothian South and
Penicuik Ward elected members. 
Page 24 of 86

Page 25

4 UPDATE ON MLDP2 ENGAGEMENT 
4.1 At its meeting of 28 February 2023 the Committee agreed to commence
the preparation of MLDP2.  The first major stage in the preparation of
MLDP2 is widespread engagement to inform the production of the
Evidence Report.  The Evidence Report will be produced later in 2023. 
4.2 The purpose of the Evidence Report is to set out the evidence that will
be used to inform what to plan for, before the Proposed Plan for MLDP2
looks at where development should take place and the document’s
spatial strategy and policy framework is produced.  The Evidence
Report will provide a summary of the evidence gathered by the Council,
and an analysis of what the evidence means and its implications for the
Proposed Plan.   
4.3 Once approved by Council, the Evidence Report must be submitted to
Scottish Ministers for assessment (known as the “Gate Check”).  This
process is intended to confirm Midlothian Council has sufficient
information to start producing the Proposed Plan for MLDP2.  The
MLDP2 programme is to submit the Evidence Report to Scottish
Ministers (through Scottish Government Directorate for Planning and
Environmental Appeals (DPEA)) in early 2024. 
4.4 There are a number of legislative requirements relating to engagement
for evidence gathering (for the Evidence Report) with specific
stakeholders, including the public at large, disabled people, gypsies and
travellers, children and young people, community councils and
(Government) key agencies.  The aim is to include in the Evidence
Report information about the lived experience of those who live and
work in Midlothian, alongside technical data. 
4.5 The Planning (Scotland) Act 2019 made changes to the planning
system that mean that early phases of producing a new local
development plan relate to the collection of evidence, and do not involve
engagement or consultation on site specific matters, such as new
development allocations (this action comes later in the process). 
MLDP2 Engagement Plan 
4.6 During 2023 engagement will be taking place with community, local
businesses and organisations, developers, third sector organisations,
Government key agencies and other stakeholders to collect information
for the Evidence Report. 
4.7 An Engagement Plan for MLDP2 has been produced to explain how and
when the Planning, Sustainable Growth and Investment Service will
engage with these different groups during the production of MLDP2.  A
copy of this plan is provided in Appendix A of this report and it is
requested that Committee notes and approves this plan. 
4.8 The Engagement Plan will need to be regularly updated as work on the
various stages of producing MLDP2 progress.  The attached version
Page 25 of 86

Page 26

provides fuller details on the planned engagement up to the approval of
the Evidence Report, and an outline of engagement in the following
stages of MLDP2 preparation.  The Engagement Plan expands on the
information provided in the Participation Statement, which was agreed
by Committee as part of the Development Plan Scheme 15 (DPS15). 
Local Place Plans and MLDP2 Drop In Events 
4.9 Invitations have been issued to community groups to prepare Local
Place Plans.  An in person event on Local Place Plans with the
Midlothian Federation of Community Councils took place with Council
staff at the Lasswade Centre on Saturday 25 March 2023. 
4.10 Details of open to all ‘Drop In Events’ for MLDP2 arranged for May and
June 2023 are below.  These are intended to help collect information for
the Evidence Report on the lived experiences of those who live and
work in Midlothian: 
• Thursday 4 May – 1pm to 7pm at Gorebridge Library
• Tuesday 9 May - 1pm to 7pm at Loanhead Library, 
• Thursday 11 May - 1pm to 7pm at Dalkeith Library, 
• Tuesday 23 May - 1pm to 7pm at Lasswade Library, 
• Thursday 25 May - 1pm to 7pm at Newtongrange Library
• Thursday 1 June - 1pm to 7pm at Penicuik Library 
5 RECOMMENDATIONS 
5.1 It is recommended that the Committee: 
i) Note the details of the elected member workshops arranged with
regard NPF4 and MLDP2;
ii) Approves the MLDP2 Engagement Plan (Appendix A); and
iii) Authorises the Planning, Sustainable Growth and Investment
Service Manager to update the MLDP2 Engagement Plan as and
when necessary. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:   9 May 2023
Contact Person:  Grant Ballantine, Lead Officer Conservation and
Environment, grant.ballantine@midlothian.gov.uk
Background Paper: The 28 February 2023 Committee report on NPF4
and MLDP2.
Appendices:  Appendix A: Midlothian Local Development Plan 2
Engagement Plan. 
Page 26 of 86

Page 27

1
MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
ENGAGEMENT PLAN 
This Engagement Plan consists of following four parts, which reflects the process for
preparing Midlothian Local Development Plan 2: 
• PART 1 - EVIDENCE GATHERING (for Preparation of Evidence Report for
Midlothian Local Development Plan 2);
• PART 2 - PREPARATION OF MIDLOTHIAN LOCAL DEVELOPMENT PLAN
2 PROPOSED PLAN AND DELIVERY PROGRAMME;
• PART 3 - PUBLICATION OF MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
PROPOSED PLAN AND PROPOSED DELIVERY PROGRAMME; AND
• PART 4 – ADOPTION AND IMPLEMENTATION OF MIDLOTHIAN LOCAL
DEVELOPENT PLAN 2 AND DELIVERY PROGRAMME.
PART 1 - EVIDENCE GATHERING (for Preparation of Evidence Report for
Midlothian Local Development Plan 2)
PLAN
STAGE WHO WHAT HOW WHEN
Evidence
Gathering
Community
Councils 
(including the
Federation of
Midlothian
Community
Councils) 
Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them. 
Online and in
person
meetings.
Invitations to
drop in events
Inviting them to
prepare Local
Place Plans. 
Spring,
Summer and
Autumn 2023
Attended
Federation
meeting on
25 March
2023.
Evidence
Gathering
Children &
Young People
(including
school pupils)
As above, adapted to the
specific interests/
perspectives of children
and young people 
Sessions in
schools
Targeted
communications
electronically via
existing
networks
Summer and
Autumn 2023
Invitation to
schools for
in-class
sessions
issued 24
April 2023
Evidence
Gathering
Older People Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them.
In person
meetings
utilising existing
groups and
networks
Spring,
Summer and
Autumn 2023
Appendix A
Page 27 of 86

Page 28

2 
Evidence
Gathering
Community
Bodies &
Groups
As above Online and in
person
meetings. 
Invitations to
drop in events 
Inviting them to
prepare Local
Place Plans. 
Spring,
Summer and
Autumn 2023
Evidence
Gathering
Gypsy &
Traveller
community
Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them.  
In person
meetings,
utilising existing
networks.
Summer and
Autumn 2023
Evidence
Gathering
Disabled
People 
As above Online and in
person
meetings,
utilising existing
networks
Summer and
Autumn 2023
Evidence
Gathering
Key Agencies
& Public
Bodies
(external to
Midlothian
Council)
-NHS Health
and Social
Care
Partnership
-SEPA and
Scottish Water
-NatureScot
and Historic
Environment
Scotland
-Transport
Scotland and
SEStran
-Scottish
Forestry
-Scottish
Enterprise
Obtain information on
infrastructure capacity
constraints, and planned
and needed investment in
Midlothian. 
Get advice on content and
review of content of
Evidence Report.
Teams
meetings
Spring,
Summer and
Autumn 2023
Page 28 of 86

Page 29

3
Evidence
Gathering
Landowners
(including
Landed
Estates)
Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them. 
Matters to be engaged on
will include estate
diversification, climate
change adaptation and net
zero, current and future
land use
Online and in
person
meetings
Spring,
Summer and
Autumn 2023
Evidence
Gathering
Developers 
(including
private
housing
developers,
registered
social
landlords, and
commercial
developers)
Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
relevant issues including,
housing need and
demanding, delivery of
affordable, climate change
adaption and net zero,
labour and material supply
issues.
Online and in
person
meetings
Spring,
Summer and
Autumn 2023
Evidence
Gathering
Community
Planning
Partnership (all
partners)
Awareness raising and
getting access to
community planning
partners for their input to
the Evidence Report
Online meetings Spring,
Summer and
Autumn 2023
Evidence
Gathering
Midlothian &
East Lothian
Chamber of
Commerce
(MELCC) 
Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them.
Online meetings
Organisations
and businesses
questionnaire 
Spring,
Summer and
Autumn 2023
Evidence
Gathering
Midlothian
Council
services
including:
Getting details issues
across sections of the
Council and what needs to
be taken into account in
Online and in
person
meetings
Spring,
Summer and
Autumn 2023
Page 29 of 86

Page 30

4 
-Education
-NHS Health
and Social
Care
Partnership
-Housing
-Land and
Countryside
-Waste
-Fleet
-Environmental
Health
-Building
Standards
-Economic
Development
-Property
Maintenance
-Estates
the next Midlothian Local
Development Plan.
Highlight the importance
critical corporate role of
Midlothian Local
Development Plan 2. 
Evidence
Gathering
Infrastructure
providers
including: 
-Network Rail
-bus operators
in Midlothian
-energy
providers
(electricity and
gas)
-telecoms
providers,
including
broadband
Obtain information on
infrastructure capacity
constraints, and planned
and needed infrastructure
investment in Midlothian. 
Online meetings Spring,
Summer and
Autumn 2023
Evidence
Gathering
Neighbouring
local
authorities
Understand cross border
and shared interests
Online and in
person
meetings
Summer and
Autumn 2023
Evidence
Gathering
General public   Seek views and have
regard to them in the
preparation of the
Evidence Report and
Proposed Plan.  Seek
information on lived
experience of living and/or
working in Midlothian and
matters of importance and
relevance to them.
Drop in events 
Online
questionnaires
Spring,
Summer and
Autumn 2023 
Page 30 of 86

Page 31

5
PART 2 - PREPARATION OF MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
PROPOSED PLAN AND PROPOSED DELIVERY PROGRAMME (To be updated
at appropriate time)
PLAN
STAGE WHO WHAT HOW WHEN
Preparation
of Proposed
Plan and
Proposed
Delivery
Programme
Relevant parties,
where necessary,
referenced in Part
1 of this document
Engagement with relevant
parties on evidence and
content while producing
the Proposed Plan and
Proposed Delivery
Programme
TBC –
Likely in
person
and
virtual
Spring 2024
and Spring
2025
PART 3 - PUBLICATION OF MIDLOTHIAN LOCAL DEVELOPMENT PLAN 2
PROPOSED PLAN AND PROPOSED DELIVERY PROGRAMME (To be updated
at appropriate time)
PLAN
STAGE WHO WHAT HOW WHEN
Publication
of Proposed
Plan and
Proposed
Delivery
Programme
Parties referenced
in Part 1 of this
document, including
the Key Agencies
for the Proposed
Delivery
Programme
Consultation with parties
on the published
Proposed Plan and
Proposed Delivery
Programme
TBC –
Likely in
person and
virtual
Spring and
Summer
2025
PART 4 – ADOPTION AND IMPLEMENTATION OF MIDLOTHIAN LOCAL
DEVELOPENT PLAN 2 AND DELIVERY PROGRAMME (To be updated at
appropriate time)
PLAN
STAGE WHO WHAT HOW WHEN
Adoption of
Midlothian
Local
Development
Plan 2 and
Delivery
Programme
Parties referenced
in Part 1 of this
document ,
including the Key
Agencies for the
Proposed Delivery
Programme
Engagement with parties
to help deliver the
adopted Midlothian Local
Development Plan 2
(MLDP2) and its Delivery
Programme
TBC –
Likely in
person and
virtual
Adoption of
MLDP2 in
December
2026 and
adoption of
Delivery
Programme
within three
months.
Then
ongoing to
Winter 2036
Page 31 of 86

Page 32

Page 32 of 86

Page 33

Planning Committee
Tuesday  16 May 2023
Item No: 5.3
TREE PRESERVATION ORDER (1 of 2023) AT LAND AT THE KILN (KILN
COTTAGE), QUARRRYBANK, COUSLAND AND LAND AT NORTHFIELD
FARM, COUSLAND
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 This report seeks the Committee’s approval to confirm a Tree Preservation
Order (TPO) 1 of 2023 issued on 25 January 2023 for twelve individual
trees (T1 – T12) and four groups of trees (G1 to G4) at land at The Kiln
(Kiln Cottage), Quarrybank, Cousland.  The report also seeks the
Committee’s approval to amend the TPO.
2 BACKGROUND
2.1  At its meeting of 10 January 2023 the Committee determined to issue a
TPO regarding twelve individual trees (T1 – T12) and four groups of trees
(G1 to G4) at land at The Kiln (Kiln Cottage), Quarrybank, Cousland.
2.2 The TPO was issued on the basis that a report regarding the confirmation
of the TPO, once the owner of the land and other interested parties have
had the opportunity to make comment, be reported to Committee for
consideration.  The following details of the case are set out in the 10
January 2023 Committee report attached as Appendix B: 
• Site location and description:
• Background and justification for issuing the TPO;
• Details of the TPO proposal;
• Location plan;
• Local development context plan; and
• Site photos
2.3 The TPO came into effect on 25 January 2023 and continues in force for
six months (until 25 July 2023) or until the Order is ‘confirmed’, which is the
process of making the TPO permanent (until it is removed).
2.4 Following the service of the TPO the landowners were given the
opportunity to make representation.  Furthermore, in accordance with the
Regulations, a notice was published in the Midlothian Advertiser and on
the Council’s website and the Tynewater Community Council (who
informed the Cousland Village Hall Association) were also notified of the
Page 33 of 86

Page 34

decision to issue the Tree Preservation Order and invited to make a
representation.  In addition, a site notice was attached to nearby gates and
fences in three locations advising of the TPO and the consultation process.
Interested parties were given until 31 March 2023 to make representations,
this was extended to 17 April 2023 for the property owner in response to a
request from their agent.  Legislation requires that a period of at least 28
days is made available for representation to be submitted to the Council
following a decision to make a Tree Preservation Order. 
2.4  One representation on behalf of the landowner and two representations
from interested parties were received.  The representations are attached
as Appendix C.
3 REPRESENTATIONS
3.1 The Council received one representation objecting to the issuing of the
TPO on behalf of the owners of land at The Kiln (Kiln Cottage),
Quarrybank, Cousland.  The representation included a tree survey report,
the accompanying letter stated:
“On the 28th of March 2023 I carried out a visual tree assessment with the
aid of an acoustic hammer and girthing tape, surveying all trees within the
extent of TPO 1-2023. Many are of poor merit, have low amenity value and
aesthetics and are not worth of preservation. T16 is a particularly nice
specimen although wire is running through the lower stem. In summary I
would like to propose a management plan going forward even if TPO 1-
2023 is to be made….”
3.2 The tree health and safety and stability issues raised have since been the
subject of a work to tree application (23/00256/WTT).  The application
requested permission to carry out tree safety and tree management works
including felling of 17 individual trees for health and safety and structural
reasons, pruning works and the removal of ash trees due to ash dieback
disease.  The work to tree application was granted on 25 April 2023 and
conditioned replacement tree planting on site.  As a consequence the
proposed TPO plan, attached to this report as Appendix A, and schedules
have to be updated to take into account the tree removals.  Replacement
planting has been conditioned through the work to tree application and will
be protected by the TPO if confirmed by the Committee. 
3.3 It is considered that the tree safety concerns raised in the tree survey
report have been addressed by the work to tree application, leaving the
remaining trees in the modified TPO to be confirmed should the Committee
determine to do so.  This ensures that the protected trees can continue to
contribute to tree canopy cover and the landscape amenity of Cousland,
whilst safety issues have been addressed.  It is advised therefore that the
above representation has been addressed and should not prevent the
confirmation of the TPO.
3.4 The Council received two further representations.  The first supported the
issuing of the TPO and stated:
Page 34 of 86

Page 35

“I want to say I am glad to see the tree preservation order being put in
place for trees at this site, as we have had woodpeckers and birds of prey
utilising the trees on this piece of land and it would be sad to see any of
them be taken down, especially since every tree counts in battling climate
change and saving our natural environment.”
3.5 The second representation requested an amendment to the TPO land
description to more accurately describe the TPO land parcels, and
requested the TPO be modified in order to remove tree groups G3 and G4
from the TPO as these trees need regular work in order to allow farm
vehicles and livestock access.  The representation states:
“With reference to the above order and relative map, I would like to draw
your attention to the group of trees marked as G4 and part of G3. These
are not within the boundary of the land at Kiln, Quarrybank, Cousland, but
are within the land at Northfield Farm, Cousland. There is a gated farm
access road off the main road between G3 and G4 which is in constant use
for farm vehicles and livestock to access fields on either side of the road.”
3.6 In response the TPO title can be modified to include the names of both
land parcels within the TPO.
3.7 The work to tree application process for TPO trees makes provision for
land owners, tenants and occupiers to continue to manage their trees
through the submission of an application detailing the proposed pruning or
felling works required; the submission is then considered by the Council
and approved if the proposed works are acceptable.  The application
process allows the Council to balance the needs of landowners and
occupiers and tree safety issues with the aim of retaining tree cover.  The
retention of tree groups G3 and G4 in the TPO will ensure that the
management of the trees can take place whilst preserving overall tree
cover on the approach to Cousland from the west. 
3.8 The work to tree application 23/00256/WTT includes proposals to crown lift
some trees within Group 3 and Group 4 to facilitate vehicle access, and
removal of ash trees in these groups due to Ash Dieback.  The application
was approved subject to conditions, particularly requiring replacement
planting of Hawthorn within these tree groups.  It is possible that these tree
works will resolve the access issues raised in this representation.  Should
it be necessary, the tenant or landowner, or a third party (such as a
qualified arborist or arboricultural consultant) can submit a new work to
tree application requesting permission to carry out further tree works.  It is
advised therefore that the concerns raised about the inclusion of Group 3
and Group 4 can be resolved through the normal work to tree application
process, and should not prevent the confirmation of the TPO.
3.9  With regard the description of the land parcels covered by the TPO the
representation states:
Page 35 of 86

Page 36

“With regards to the land ownership for tree Group 4 & part of Group 3 this
is the same as the rest of the tree preservation order…. So in effect there
are two land parcels, one being the Kiln, Quarrybank, and the other being
Northfield Farm, Cousland. Therefore, to help me understand the situation
better it would be really useful if you could clarify why Group 4 & part of
Group 3 were included in the TPO initially when they are in different land
parcels.”
3.10 The TPO title can be amended to reference both land parcels namely land
at The Kiln, Quarrybank and also land at Northfield Farm, Cousland. 
3.11 In response to the consultation process and the approved works to trees
application reference it is proposed to amend the TPO as follows:
• The TPO title is amended to read: Land at The Kiln, Quarrybank and
land at Northfield Farm, Cousland;
• The number of individual trees listed in the TPO at Schedule 1 is
reduced from twelve to eight due to some tree safety works, consented
through work to tree application 23/00256/WTT.  The works have
included permission for felling of a number of mature trees on site,
some of which were numbered individually in the original TPO and
some of which were part of the tree groups G1 to G4.  The permission
also covers removal of all Ash trees in Groups 3 and 4;
• The TPO Schedules will be updated to remove reference to the
individual trees removed, and to remove reference to the Ash trees in
Groups 3 and 4 owing to the removal of Ash due to Ash dieback; and
• The TPO plan is amended to illustrate the reduction in individual trees.
4 PLANNING ISSUES
4.1  The individual trees identified in the TPO (subject to amendment) are
worthy of protection on their own merits, as individual trees characteristic
of their pastoral setting.  Tree Groups G1 and G2 are worthy of protection
as tree groups related to The Kiln/Northfield Farm and farm buildings; and
Tree Groups G3 and G4 appear to be self-seeded groups marking the
former quarry location and therefore providing a link to the site’s historic
and cultural importance to the village, whilst also contributing to the
woodland setting on the approach to Cousland from the west.
4.2 The individual trees and tree groups feature in views from the north and on
the approach to Cousland from the west.  They are also widely visible from
the dwellings on the northern side of Cousland at Beech Grove.  They add
to the setting and amenity of the area and help to integrate the more recent
development at Beech Grove into the village as a whole, giving a sense of
containment to the village. 
4.3 The tree groups in particular contribute to the local biodiversity green
network, providing connections and canopy cover between Cousland and
the nearby Bellyford Burn corridor, which runs in a west to east direction to
the north of the site at approximately 240 metres from the sites boundary.
Page 36 of 86

Page 37

4.4 The trees form part of the landscape character of the area and contribute
to the local green network.  The issuing of a TPO will be an important tool
in protecting the trees aiding in the preservation of local amenity,
biodiversity and habitat connectivity.
4.5 During the consultation period following the issuing of the TPO a work to
tree application (23/00256/WTT) was submitted by the landowner
proposing tree works within the TPO area.  The work to tree application
was based on a tree survey report carried out by a qualified arboricultural
consultant company and identified some recommended tree works based
on health and safety and stability issues.  The application requested the
felling of 17 individual trees, trees T1, T2 T8 and T10 as numbered on the
original TPO plan and a number of trees within Tree Groups 1 and 2, some
tree pruning works and removal of ash trees within Groups 3 and Group 4
due to Ash Dieback.  The application was approved with conditions, in
particular the provision of replacement planting. 
4.6 The confirming of the TPO (with modification as set out in this report) will
be an important tool in perpetuating canopy cover in the area in order to
address the climate emergency, protecting the trees for their amenity and
place functions and preserving local biodiversity and habitat connectivity. 
5 PROCEDURES
5.1 The provision for issuing a Tree Preservation Order is set out in the Town
and Country Planning (Scotland) Act 1997, as amended by the Planning
etc. (Scotland) Act 2006, and the Town and Country Planning (Tree
Preservation Order and Trees in Conservation Areas) (Scotland)
Regulations 2010.  A planning authority may make a Tree Preservation
Order if it appears to them to be “expedient in the interest of amenity
and/or that the trees, groups of trees or woodlands are of cultural or
historic significance” (Scottish Government Planning Circular 1/2011: Tree
Preservation Orders).  The TPO subject of this report has been made on
amenity grounds.
5.2 The TPO will continue to remain in effect to the end of the six month period
(ending 25 July 2023).  If the local planning authority wishes the TPO to
stay in effect beyond the six months it must ‘confirm’ the order. 
5.3     To ‘confirm’ the Order the LPA must register the TPO in the Land Registry
of Scotland, place a copy on its own TPO register and notify Scottish
Forestry (previously the Forestry Commission Scotland), interested
persons and any person who has made a representation (in this case no
representations were received).
Page 37 of 86

Page 38

6 RECOMMENDATION
6.1 It is recommended that Committee:
a) Confirm the Tree Preservation Order (1 of 2023) as modified for eight
individual trees (T1 – T8) and four groups of trees (G1 to G4) at land at
The Kiln, Quarrybank Cousland and land at Northfield Farm, Cousland;
and
b) Instruct the Planning, Sustainable Growth and Investment Service
Manager to carry out the necessary procedures, following confirmation
and endorsement of a tree preservation order, that are required by the
Town and Country Planning (Scotland) Act 1997, as amended by the
Planning etc. (Scotland) Act 2006 and the Town and Country Planning
(Tree Preservation Order and Trees in Conservation Areas) (Scotland)
Regulations 2010.
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager
Date:   9 May 2023
Contact Person: Grant Ballantine
grant.ballantine@midlothian.gov.uk
Background Papers: January 2023 Committee Report (Appendix B)
Page 38 of 86

Page 39

Appendix A
Page 39 of 86

Page 40

PLANNING COMMITTEE 
10 JANUARY 2023 
ITEM NO 
TREE PRESERVATION ORDER REGARDING TREES AT THE KILN (KILN
COTTAGE), QUARRYBANK, COUSLAND 
Report by Chief Officer Place 
1 PURPOSE OF REPORT 
1.1 This report seeks the Committee’s approval to issue a Tree Preservation
Order (TPO) on twelve individual trees and four groups of trees located
at The Kiln (Kiln Cottage), Quarrybank, Cousland. 
2 LOCATION AND SITE DESCRIPTION 
2.1 The site is located on the northern edge of Cousland, immediately
adjacent to dwellings on Beech Grove Cousland.   
2.2 The trees are located on pasture land, garden ground and amongst
outbuildings at the property known as The Kiln or Kiln Cottage,
Quarrybank, Cousland and on land immediately adjacent to the un-
named road running west from Cousland to the A6124. 
3        BACKGROUND 
3.1 A planning history search for the site identified that there have been no
planning applications relating to the site.   
3.2 Residential development on land to the west of the site at Airybank,
comprising five dwellinghouses, is separate from the site by the un-
named road that leads to the A6124. 
3.3     There have been a number of historic planning applications from 1993 to
2011 regarding land to the north of the site at the former Cousland
Limeworks.  The original applications related to the use of the land for
the disposal of inert waste material and the restoration of the land for
use as a horse-riding and training centre.  Subsequent applications
related to the extension of the landfill site and to extensions of time
allowed for the infilling and restoration of the site.  Further, applications
supported the erection of an equestrian centre, manager’s house,
temporary caravan, equine pool, stables, hay store, indoor riding school,
the erection of wind turbines and a change of use from agricultural land
to an equestrian use to create gallops.  The two turbines which were the
Appendix B
Page 40 of 86

Page 41

subject of applications 05/00145/FUL and 05/00462/FUL have since
been dismantled and replaced with new turbines (applications
11/00401/DPP and 11/00402/DPP). 
3.4  The site which is the subject of the proposed TPO was historically a
quarry as depicted in the ordnance survey (OS) six inch map from 1888
to 1913.  Historical maps from between 1885 to 1914 also show the site
as being part woodland.  The 1937 to 1961 OS map of the site still
shows the quarry but now also includes a cottage in the location of Kiln
Cottage and by the time of the 1944 to 1971 OS map the quarried area
is located further north of the site, with buildings in the area around Kiln
Cottage and tree cover to the south of the cottage. 
3.5 In the more recent past the site has been in use for agricultural
purposes and in part forming garden ground for Kiln Cottage.  The
former quarry area closest to the road remains disused and vegetated
with self-seeded woodland.  Kiln Cottage appears to be currently empty
and the agricultural buildings on the site appear disused and derelict.  At
the time of two site visits in early 2022 and late summer 2022 the land
appears not to be in use for grazing or any other agricultural use. 
4    PROPOSAL 
4.1      It is proposed to issue a Tree Preservation Order (TPO) covering twelve
individual trees and four tree groups as shown on the attached location
plan, in the attached photographs and as described below: 
4.2      As a whole the individual trees proposed for protection are a diverse mix
of broadleaf and conifer species, many of which are mature or semi-
mature ranging from the native trees found within the fields, through to
the more diverse species of trees within the garden ground of the
cottage which includes a line of prominent Larch and mature Beech
trees as well as other garden trees. 
4.3     There are some Ash trees amongst the individual trees proposed and
within some of the groups.  Within the woodland groups, there are some
signs of Ash Dieback disease, whereas the individual trees proposed
within the order were not showing advanced signs when last inspected. 
In particular, the two large mature Ash trees within the fields are
significant in size and age, and as is consistent with Ash Dieback
progression, are not suffering from the disease to the extent that
younger trees may.  It is acknowledged however that should a TPO be
issued the condition of any Ash trees will require to be reviewed. 
4.4 Tree Group 1 comprises a mature group of Larch, Scots Pine, Oak and
Hawthorn within the field on the southern edge of the site directly to the
north of Beech Grove.  This group of trees helps to define the character
and setting and amenity of the adjacent dwellings on Beech Grove. 
Page 41 of 86

Page 42

4.5 Tree Group 2 comprises a mix of broadleaf and conifer species located
along the southern site boundary with Beech Grove and in the area
around the cottage on the site known as The Kiln or Kiln Cottage and
amongst the outbuildings.  This accounts for the varied species and
ages of the trees in the group, some of which are mature, whilst others
are semi-mature and younger.  The trees in the group provide the
setting for the cottage as well as contribute to the setting for the village
of Cousland by defining the northern edge of the settlement.  This group
includes of Larch, Beech, Scots Pine, Lime, Cypress, Oak, Rowan,
Malus, Prunus, Holly. 
4.6     Tree Groups 3 and 4 define the edge of the road leading away from
Cousland to the A6124.  These groups appear to be self-seeded on the
remains of the former quarry.  The species in these two groups include
Ash, Sycamore and Hawthorn.  These groups are important in visually
defining the road on the approach to the village, and along with the
other trees in the proposed TPO contribute to green network
connections locally. 
5        PROCEDURES 
5.1  The provision for issuing a Tree Preservation Order is set out in the
Town and Country Planning (Scotland) Act 1997, as amended by the
Planning etc. (Scotland) Act 2006 and the Town and Country Planning
(Tree Preservation Order and Trees in Conservation Areas) (Scotland)
Regulations 2010. A planning authority may make a TPO if it appears to
them to be “expedient in the interest of amenity and/or that the trees,
groups of trees or woodlands are of cultural or historic significance”
(Scottish Government Planning Circular 1/2011: Tree Preservation
Orders). 
5.2 Following the service of a TPO the owner of the land and other
interested parties have the opportunity to make representation.  
However there is no right of appeal against a Tree Preservation Order. 
5.3 The TPO shall be in effect for six months, during which time
representations from the owner of the land and other interested parties
will be considered.  If the local planning authority wishes the TPO to
stay in effect beyond the six months it must ‘confirm’ the order. 
6 PLANNING ISSUES 
6.1 The site’s disused and partially derelict state has increased the prospect
that the land may be sold or redeveloped, which in turn could threaten
the existence of the identified trees.  Trees T1 to T12 are worthy of
protection on their own merits, as individual trees characteristic of their
pastoral setting.  Tree Groups G1 and G2 are worthy of protection as
tree groups related to The Kiln/Kiln Cottage and farm buildings; and
Tree Groups G3 and G4 appear to be self-seeded groups marking the
former quarry location and therefore providing a link to the site’s historic
Page 42 of 86

Page 43

and cultural importance to the village, whilst also contributing to the
woodland setting on the approach to Cousland from the west. 
6.2 The individual trees and tree groups feature in views from the north and
on the approach to Cousland from the west.  They are also widely
visible from the dwellings on the northern side of Cousland at Beech
Grove. They add to the setting and amenity of the area and help to
integrate the more recent development at Beech Grove into the village
as a whole, giving a sense of containment to the village. 
6.3 The tree groups in particular contribute to the local biodiversity green
network, providing connections and canopy cover between Cousland
and the nearby Bellyford Burn corridor, which runs in a west to east
direction to the north of the site at approximately 240 metres from the
sites boundary. 
6.4 The trees form part of the landscape character of the area and
contribute to the local green network.  The issuing of a TPO will be an
important tool in protecting the trees aiding in the preservation of local
amenity, biodiversity and habitat connectivity. 
7 RECOMMENDATION 
7.1 It is recommended that the Committee: 
a) Agrees to the issuing of a TPO to protect the identified trees at The
Kiln, Quarrybank, Cousland; and
b) Agree to receive a further report to consider confirming the TPO
once the owner(s) of the land and other interested parties have had
the opportunity to make comment. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:     20 December 2022  
Contact Person:  Grant Ballantine    
grant.ballantine@midlothian.gov.uk
Background Papers: Site location plan and site photographs 
Page 43 of 86

Page 44

Page 44 of 86

Page 45

Proposed Tree Preservation Order at: The Kiln, Quarrybank, Cousland
Site Photos: Dates 28th March 2022 and 18th August 2022
Individual Trees 
T2 Ash with T1 Ash in background, looking East 
T8 (with T7-T5 in background), looking North-East 
Page 45 of 86

Page 46

T10,11,12 (with G3 and G4 in the background), looking North 
Tree Groups 
G1 with G2 in background, looking West 
Page 46 of 86

Page 47

G1 looking South-East with Beech Grove to the rear 
G2 looking East 
Page 47 of 86

Page 48

G2 looking South, including Kiln Cottage 
G3 (with G4 in background). Looking North from the site entrance gate 
Page 48 of 86

Page 49

G3 andG4 viewed from the road to Cousland, looking East 
Site Wide Views: Looking West across the site with T2 in the foreground and groups G2 in the
background 
Page 49 of 86

Page 50

```` 
Forest Direct Ltd 
31/03/2023
To whom it may concern,
Please find attached my findings in the form of a report, I have several concerns regarding the trees
situated within the proposed TPO (TPO1-2023) area at Kiln Cottage Cousland.
On the 28TH of March 2023 I carried out a visual tree assessment with the aid of an acoustic hammer
and girthing tape, surveying all trees within the extent of TPO 1-2023. Many are of poor merit, have low
amenity value and aesthetics and are not worth of preservation. T16 is a particularly nice specimen
although wire is running through the lower stem.
In summary I would like to propose a management plan going forward even if TPO 1 -2023 Is to be
made, all supporting data and information can be found in appendix A and E of the report.
All beech apart from T16 are to be removed due to various stages of decay throughout the lower stem,
due to their size and location they pose significant risk to both property and life. 
The Larches and Leylandii should be removed, all are in decline and some are causing structural damage
to both existing buildings and boundary walls and not worthy of preservation.
Ash trees-26,28 33,34 are all removed due to their high level of Ash die back, and alternative species
are planted as replacements.
Groups 3 and 4 - as stated in the council’s report these are self-seeded hedge rows and trees
compromising predominantly of Ash, Sycamore and Hawthorn.
I would like to propose remove all the Ash from within these groups and high prune the trees on the
southern edge of 4 and northern edge of 3 to allow continued access for stock trucks and tractors as
although situated out of my client’s land holding the neighbouring farmer requires access at all times of
the year for stock.
My client has no issues with replanting and maintaining native species once trees have been removed
but on the basis that they can be relocated to somewhere more suitable to avoid having the same
issues reoccurring in essence right tree right place.
If at all possible we would like to arrange a meeting on site with yourselves and my client to discuss this
further. 
If you have any further questions or queries, please don’t hesitate to contact me. 
FDSc BSC Hons
Operations Manager. 
Forest Direct Ltd 
Appendix C
Page 50 of 86

Page 51

TREE SURVEY REPORT
FOR 
Forest Direct Ltd 
DATE 30/03/23 
Page 51 of 86

Page 52

1 
Contents
1. Introduction ......................................................................................................................... 2
Description and area............................................................................................................... 2
2. A defensible tree safety survey ........................................................................................... 2
Hazard classification ............................................................................................................... 2
Frequency of inspection .......................................................................................................... 3
Surveyor competency: ............................................................................................................ 3
Limitations of tree survey ........................................................................................................ 3
Zones of risk ........................................................................................................................... 4
3. Tree survey objectives and recommendations .................................................................... 4
Tree safety survey specification ............................................................................................. 4
Tree Description: .................................................................................................................... 4
Status: .................................................................................................................................... 5
Action required:....................................................................................................................... 5
4. Survey Method: ................................................................................................................... 5
Survey data management ....................................................................................................... 5
5. Summary, Recommendations and Budget costing ............................................................. 6
Future inspection and budget costs ........................................................................................ 6
6. APPENDICES: .................................................................................................................... 7
Appendix A: Summary of Works Recommended ................................................................... 7
Appendix B: Maps................................................................................................................... 7
Appendix C: Protected species: .............................................................................................. 8
Appendix D: Specific issues identified during survey ............................................................. 9
Appendix E: Supporting Pictures .......................................................................................... 10 
Page 52 of 86

Page 53

2 
1. Introduction
Forest Direct Ltd (FDL) was instructed to carry out a tree safety survey and produce an associated report
for  for the purposes of this report is referred to as Kiln Cottage. The survey will cover
all trees located within the survey area and within falling distance of public highways, footpaths and
buildings. 
Description and area
Kiln Cottage is composed of several out buildings and small steading located in the village of Cousland.
Following a Tree Preservation order being subjected on the land held by  Forest
direct were asked to carry out a tree survey to find trees that posed a risk to the public/property and
provide evidence for the removal of the tree preservation order.   
2. A defensible tree safety survey
As the owner of a broad and varied population of trees across the estate, the landowner has a duty of
care to ensure, as far as reasonably practicable, that trees within its ownership are unlikely to cause
harm. 
In practice this requires a balance between the interests of the owner of trees, those of the people that
may be harmed by them and those of the general public. It is not possible to ensure complete and
guaranteed safety unless no trees are present. 
The basis of a defensible tree safety policy should include the following:
• An awareness of hazards, risks and legal obligations.
• Awareness of social, amenity and environmental values.
• The decision process and how it is implemented.
• Recording monitoring and feedback. 
It is suggested that the aim for tree management across Kiln Cottage should include the following:
• To manage the tree population to maintain a reasonable balance between the landscape,
biodiversity, economic and health benefits, that trees by their very presence provide, whilst
ensuring, by sound management and practice, that the risk of harm to persons and property is
minimised as far as is reasonably practical.  
Hazard classification
Hazards are classified by the following criteria:
• Failure potential: how likely is it that the tree or part of the tree will fail?
• What is the size of the tree or part that is most likely to fail?
• Target rating: how likely the tree or part of the tree will hit something on failure and what is the
relative value of any damage. 
It should be noted that a hazard classification is predominantly a means of risk assessment for
prioritisation of works and the hazard assessment will always be subjective. Although most trees may
contain deadwood and defects, these are only assessed and recorded when considered significant as 
part of the risk assessment carried out during the tree safety survey.
Page 53 of 86

Page 54

3 
Frequency of inspection
It is unlikely that there are sufficient resources to inspect all trees on a daily or even an annual basis.
Therefore, the frequency of inspection is determined by the following criteria:
• Tree surveyor competency and Zones of risk. 
Surveyor competency:
Generally, there are three levels of competence which are detailed as follows:
• Level 3: Detailed survey by competent Arboriculturist or Forest Manager trained in tree hazard
evaluation; to be carried out initially and at intervals according to the agreed “Zones of Risk”.
• Level 2: Survey to be carried out by trained contracting Arboriculturist whenever carrying out
remedial works to trees. This will often include an aerial inspection when climbing to carry out
such works and will include a written report allowing updating of the electronic tree database.
• Level 1: Survey to be carried out by in house staff or tree wardens trained to LANTRA Level 1:
Basic Tree Inspection and/or Engineer level (as stated in the DoE Circular Roads 52/75
Inspection of Highway Trees) to identify and report trees which develop obvious defects in the
time period between Level 2 or 3 surveys, including: the development of fungal fruiting bodies;
dieback or death; structural failure (particularly following storms); lifting of root plates or
increased leaning of trees; exudation from stems or branches or other. 
Forest Direct’s Operations Manager, , holds the Lantra Tree Inspection qualification and
has been carrying out arboriculture works and surveys for the past 13 years and is also an specialist
advisor for the Scottish government. 
Tree surveyor  holds the Lantra Tree Inspection qualification and has been carrying out
arboriculture works and surveys for the past 4 years. 
Limitations of tree survey
The findings and recommendations contained within this report are valid for a period of twelve months
from the date of survey. Trees are living organisms and subject to change. Therefore, it is strongly
recommended that some level of tree safety assessment is carried out on an annual basis. The
recommendations relate to the site that exists at present and to the current level and pattern of usage.
The degree of risk and hazard may alter as the site or its surroundings are developed or changed, and
as such may require re-inspection and re-appraisal. 
The level of risk associated with the assessed trees will vary with their condition and size but will also
vary with the public usage and surroundings of their location. Zones are continually reviewed when
monitoring inspections are carried out to ensure that any changes to existing zones or inclusion of new
areas are carried out. 
Page 54 of 86

Page 55

4 
Zones of risk 
Zones of risk have been classified as Very High; High; Moderate and Low. In addition, an indication of
the likely associated land-use is detailed in the table below: 
Risk Zone Categories  Indication of detail
Very High Risk(A): Arterial road traffic routes;
high use pedestrian pathways; Emergency
facilities; Railway lines; Playgrounds & play
areas; High priority trees in lower risk areas.
Level 1 survey: Six monthly and following storms.
Level 2 survey: When remedial work is undertaken.
Level 3 survey: 1 year or on request following Level 1
survey conclusions
High Risk: Main roads(B); Trees within the
influencing distance of residential property;
Schools (low use areas).
Level 1 survey: Six monthly and following storms. 
Level 2 survey: When remedial work is undertaken.
Level 3 survey: 2 years or on request following Level 1
survey conclusions
Moderate Risk(C): Minor roads, public rights of
way (including bridleways and footpaths);
Residential parking areas; Woodlands.
Level 1 survey: Six monthly and following storms.
Level 2 survey: When remedial work is undertaken.
Level 3 survey: 2/3 years or on request following level one
survey conclusions
Low Risk(D): Low use roads (farm and estate
tracks and roads); other open spaces.
Level 1 survey: Six monthly and following storms.
Level 2 survey: When remedial work is undertaken.
Level 3 survey: 5 years or on request following level one
survey conclusions 
3. Tree survey objectives and recommendations 
The objective of this survey is defined to be:
• Retain and ensure the long-term future of the trees within Kiln cottage.
• Ensure that the risk to the general public is minimised.
• Ensure that any liability claim is minimised. 
Tree safety survey specification
The tree safety survey aims to achieve the above objectives by identifying the tree resource across the
land parcel at Kiln Cottage and assessing their location and health. 
The survey will identify any hazards and assess the level of risk to road users and the general public and
propose a programme of remedial works to remove the hazards where possible and/or minimise the
risks. 
The survey will cover the following tree cover at Kiln Cottage:
• Assess all trees located within the TPO area at Kiln cottage. 
The survey records the following information to build up an initial database of trees recommended for
remedial tree surgery work or monitoring and the proposed timescale for the work. 
Tree Description: 
• Every tree that requires remedial work or monitoring will be given a unique reference number
Page 55 of 86

Page 56

5 
and its location recorded.
• Species, height class, age class, vigour, zone of risk and date assessed will be recorded as
appropriate.
• Tree location will be recorded on an associated plan. 
Status:
The following information relating to the health of the tree and any hazards present may be recorded.
• The presence of deadwood (as a percentage). 
• crown dieback (as a percentage). 
• decayed trunk. 
• wounds/cavities. 
• fungal attack/decay. 
• obstruction. 
• dead. 
• habitat potential. 
• damaged/unstable roots. 
• deformed leaves/buds.  
• dangerous limbs/branches. 
• continuing decline and vigour. 
Action required:
Any recommended remedial work relating to the above hazards is recorded and detailed for the relevant
individual tree or group of trees. This section also records the priority for any action on the basis that: 
• Urgent (U): requires work as soon as possible.
• 6 months (6): suggest work within approximately 6 months of the survey;
• 12 months (12): suggest work within approximately 12 months of the survey;
• 18 months (18): suggests work within approximately 18 months of the survey; 
Also assessed and recorded is: 
• Estimated labour time and cost based on a 2- or 3-person tree surgery team. 
• The frequency of required monitoring is also assessed and recorded. 
4. Survey Method:
The tree safety survey method is based on a ground level visual assessment of all trees which are within
falling distance of the public highway, footpaths, situated within the area covered by the TPO and which
are of significance in the context of reasonable tree safety management.  
The tree survey was carried out on foot by  on the 28th of March 2023 
Trees recommended for remedial work or specific monitoring were assigned a unique reference number
and their locations recorded on a map and precise geolocations.  
Survey data management
The data collected has been entered into the FDL bespoke tree management database to produce a
detailed report on proposed remedial work and a programme of monitoring inspections to achieve and
maintaining the required level of risk management. In addition, the data is used to estimate the costs
of the remedial work. 
Page 56 of 86

Page 57

6 
The tree safety survey report has been provided as a digital copy but a paper copy of the report can be
provided if required. 
5. Summary, Recommendations and Budget costing
The main objective is to retain and ensure the long-term future of the trees across the land holding at
Kiln cottage whilst ensuring that the risk to the public and any potential liability claim is minimised. 
Following a visual tree assessment, a database has been created of all trees that require remedial work
or monitoring. The data generates a programme of work required to achieve a prudent level of risk
management to be carried out and the recording of specific trees that require monitoring. 
The remedial tree works recommended are fully detailed and appended to the report. A summary is set
out in the table below with an estimated budget cost. It should be noted that the budget cost provided
is a guide only and the actual cost will be dependent on receiving competitive quotes from suitable
contractors. 
Retention category Number of trees Total Days Estimated Price
Urgent 1 1 
6 Months 6 15.5 
12 Months 3 3 
18 Months 10 9.5 
Total Cost (exc VAT): 
Future inspection and budget costs
Future inspection frequencies and associated budget costs should be considered in the context of the
risk management objectives and strategy for Oxenfoord Estate. Further assistance and budget costs can
then be provided if required. 
Monitor frequency (Months) Number of trees
3 0
6 0
12 1 
Page 57 of 86

Page 58

7 
6. APPENDICES: 
Appendix A: Summary of Works Recommended
Please see attached spreadsheet. 
Appendix B: Maps
Please see attached. 
i) Locations of all trees recorded.
ii) Locations of trees recommended for remedial work.
iii) Locations of trees recommended for specific monitoring 
Page 58 of 86

Page 59

8 
Appendix C: Protected species: 
Bats
Bats are a protected species under the European protected species legislation and neither they nor their
roosts may be disturbed without authority from Nature Scot, Natural England or DEFRA. 
It is quite possible that bat roosts are present in some of the older trees for which works are proposed,
particularly those with multiple cavities and ivy. 
It will be essential for those carrying out works on the trees to be alert for the presence of bats and the
need to contact the relevant body in advance of carrying out works to obtain a license if found. 
Bat roost may be found in the following features:
• Woodpecker holes/cavities/hollow sections/splits and frost cracks.
• Within ivy/beneath loose bark and in dense epicormic growth. 
• In bat or bird boxes. 
The tree survey records a potential bat habitat which should be assessed before work is carried out.
Please note that the record of potential bat habitat is not a conclusive survey or confirm the presence
of bats. 
It is desirable to retain bat roost features where no safety conflict exists. In general, trees should be
inspected and assessed for potential bat roosts prior to tree surgery works commencing and following
agreement on a programme of works with the contractor. 
The following guidance should be referred to in all situations other than woodland: 
Nature Scot/Natural England Guidance Note SIN010 Bats: European Protected Species. 
General
Although it is illegal to knowingly (recklessly) disturb nesting wild birds, bats and badgers, protection
legislation does not prevent normal operations that do not knowingly disturb protected species out with
their normal breeding seasons. 
Professional organisations are tending to proceed on the following basis:
• Undertake a survey in advance of work using a competent person or qualified ecological
surveyor. 
• Prepare an informal environmental risk assessment to show that known site sensitivities and
appropriate mitigation have been considered. 
• Record survey results and comments. 
• Proceed with works but postponing those trees with known presence of protected species. 
This recommendation would be overridden by works prescribed in an emergency or to preserve public
health or safety. In these situations, it is prudent to record actions taken both written and digitally in
case of future investigation and to seek independent legal advice. 
Page 59 of 86

Page 60

9 
Appendix D: Specific issues identified during survey. 
The following issues should be addressed prior to commencement of any of the recommended tree
surgery works detailed in this report. 
Item Issue Raised Action Required/Taken
1 Tree Preservation Orders (TPOs) Check with Local Authority Planning if trees with work
proposed are designated with a TPO
2 Conservation Areas Check with Local Authority Planning if trees with work
proposed are designated within a Conservation Area
3 Scottish Forestry – Felling Permissions
The Forestry Act (1980) requires a licence to be obtained for
the felling of timber exceeding five cubic metres (subject to
specific exemptions).
4 Potential damage to habitats of
protected species
Any contractors carrying out remedial work should be
aware of the potential for nesting birds or bat roosts while
working on the trees. Any such evidence should be passed
to the works supervisor and work stopped immediately. 
Page 60 of 86

Page 61

10 
Appendix E: Supporting Pictures 
T3 
Page 61 of 86

Page 62

11 
T5 
Page 62 of 86

Page 63

12 
Leylandii in G1
Page 63 of 86

Page 64

13 
T6 
Page 64 of 86

Page 65

14 
T7
Page 65 of 86

Page 66

15 
T8
Page 66 of 86

Page 67

16 
T9
Page 67 of 86

Page 68

17 
T10 
T11
Page 68 of 86

Page 69

18 
T12 
Page 69 of 86

Page 70

19 
T13 
Page 70 of 86

Page 71

20 
T 18
Page 71 of 86

Page 72

21 
T19 
T20 
Page 72 of 86

Page 73

22 
T21 
Page 73 of 86

Page 74

23 
T23
Page 74 of 86

Page 75

Ref: Common name Age class Vigour Height (m) Crown
radius (m)
Height of crown
development (m)
Estimated remaining
contribution (years)
Est BS Category DBH (cm) Tree protection radius
(m)
Tree protection area
(m2)
Zone of risk Status Action Required Clarifying or Further Recommendations Estimated days to
complete job
Priority Ongoing
Monitoring
Frequency
1 Laylandi Semi mature Moderate
Vigour
11 1 0.5 <25 C 124 14.88 695 High Risk (B) Not required
2 Laylandi Semi mature Moderate
Vigour
9 0.5 3 <25 C 82 9.84 304 High Risk (B) Not required
3 Laylandi Semi mature In Decline 6 3 1.5 >10 U 180 21.6 1465 High Risk (B) Remove Remove due to multiple failed limbs 1 12 Months Not required
4 Laylandi Young Moderate
Vigour
9 3 2.5 <20 C 75 9 254 High Risk (B) Not required
5 Laylandi Semi mature In Decline 8 7 0.5 >10 U 293 35.16 3882 High Risk (B) Remove due to existing building being damaged by roots and
multiple limb fracturing
Remove 2 18 Months Not required
6 Laylandi Semi mature In Decline 8 4 2.3 >10 u 100 12 452 High Risk (B) Multiple failed leaders pruned back at some point with new
leaders forming.
Reduce back to for one main leader or fell and
supplementary replant with native species
Native replant 1 18 Months Not required
G1 Group of
hollys,prunus,tulip and
laylandi
Young/semi
mature
Moderate
Vigour
0.5-10 .5-11 <20 C 0 0 Moderate Risk
(C)
Not required
7 Larch Mature Deep Decline 7 8 6 >5 U 160 19.2 1158 High Risk (B) Lifting root plate, large wound with decay up stem with dull
hollow notes when hit with acoustic hammer, previous limb
failures.
Remove 1 6 Months Not required
8 Larch Mature Deep Decline 11 5 6 >10 U 170 20.4 1307 High Risk (B) Lifting root plate causing structural damage to building previous
snapped limbs hanging.
Remove 1 18 Months Not required
9 Larch Mature Deep Decline 10 8 6 >5 U 220 26.4 2188 High Risk (B) Remove as soon as possible lifted root plate and tree within
falling distance of dwelling
Remove U Not required
10 Larch Mature In Decline 10 8 5 >10 u 180 21.6 1465 High Risk (B) Bird or insect workings in upper stem. Close Proximity to existing
builds causing minor damage
Remove and plant alternative in better location. Native replant 1 18 Months Not required
11 Larch Semi mature In Decline 11 6 9 >10 u 125 15 707 High Risk (B) Wire fence running through lower stem, causing structural
damage to a wall.
Remove / replant appropriately 1 12 Months Not required
12 Larch Mature In Decline 11 5 8 <10 C 165 19.8 1231 High Risk (B) Wire in lower stem. Crown snapped out with hanging branches Remove wire and reduce crown 1 18 Months Not required
13 Beech Mature Deep Decline 15 12 7 >10 U 480 57.6 10418 High Risk (B) Dull notes when hit with acoustic hammer, rot in base and large
limb, concrete fencing stay running into root plate
Remove due to significant rot and proximity to
building
3 6 Months Not required
14 Larch Mature In Decline 12 8 8 <10 C 230 27.6 2392 High Risk (B) Poor specimen with old areal antenna growing into stem.
Remove branches off shed roof by 4m
0.5 18 Months Not required
15 Laylandi Semi mature In Decline 8 6 3 <10 C 155 18.6 1086 High Risk (B) Previous crown damage, blocking out sunlight to young oak and
semi Mature beech
Remove to allow other native species to flourish and
allow supplemental planting
Native replant 1 18 Months Not required
16 Beech Semi mature Vigorous 17 6 6 <25 B 215 25.8 2090 High Risk (B) Remove wire in trunk and neighbouring laylandi to
allow beech to flourish
0.5 18 Months Not required
17 Lime Mature Moderate
Vigour
16 6 4 <20 C 260 31.2 3057 High Risk (B) Causing damage to neighbouring boundary wall Remove dead wood and reduce crown by 3-4m to
balance and rejuvenate.
0.5 18 Months Not required
18 Beech Mature Deep Decline 14 8 8 >10 U 340 40.8 5227 High Risk (B) Large cavity present in base, hollow tones up to 2m. Leaning
towards neighbouring property with old antenna growing into
trunk
Remove and replant Native replant 2.5 6 Months Not required
19 Lime Mature Moderate
Vigour
14 4 6 <10 C 240 28.8 2604 High Risk (B) Try and elevate root plate lifting which is damaging boundary
wall.
Reduce crown by 4m on all sides to reduce wind sail
area
1 12 Months Not required
20 Scot's pine Semi mature Moderate
Vigour
8 3 6 >10 u 130 15.6 764 High Risk (B) Monitor due to poor previous pruning cuts Monitor 6 monthly 12 Monthly
21 Larch Mature Deep Decline 13 4 10 >10 U 250 30 2826 High Risk (B) Basal cavity going approximately 18inches into stem, hollow/dull
tones throughout lower stem upto 2.5m. Root plate lifting on
lateral surface roots which are also damaging boundary wall.
Remove and replant alternative species. Native replant 1 6 Months Not required
22 Scot's pine Mature Moderate
Vigour
13 2.5 10 <10 C 185 22.2 1548 High Risk (B) Not required
23 Beech Mature Moderate
Vigour
14 14 0.5 <10 C 242 29.04 2648 High Risk (B) Previously pruned badly, long lateral branches in need of
reducing, along with laterals over neighbouring property, crown
could do with some thinning out of crossing branches.
Thin out crown and reduce lateral spread 1 18 Months Not required
24 Hawthorn Mature Poor 6 3 1.5 >10 U 130 15.6 764 Moderate Risk
(C)
Wire growing through stem previous limb fractures Remove wire and monitor 12 Months Not required
25 Hawthorn Mature Poor 5 2.5 0.2 >10 U 90 10.8 366 Moderate Risk
(C)
Wire growing through stem previous limb fractures Remove wire and monitor 12 Months Not required
26 Ash Semi mature Poor 8 3 2.2 >10 u 170 20.4 1307 High Risk (B) Ash die back stage 3 Remove 12 Months Not required
27 hawthorn semi mature average 3.5 2 1.5 <10 c 45 5.4 92 Moderate Risk
(C)
18 Months Not required
28 Ash semi mature Poor 10 5 0.5 >10 u 95 11.4 408 High Risk (B) Ash die back stage 3 Remove 12 Months Not required
29 Hawthorn Mature average 3 3 0.5 <10 c 43 5.16 84 Moderate Risk
(C)
18 Months Not required
30 Hawthorn Mature average 3 3 0.5 <10 c 25 3 28 Moderate Risk
(C)
18 Months Not required
Page 75 of 86

Page 76

31 Hawthorn Mature average 3 3 0.5 <10 c 50 6 113 Moderate Risk
(C)
18 Months Not required
32 Hawthorn Mature average 5 3 1.5 <10 c 40 4.8 72 Moderate Risk
(C)
18 Months Not required
33 Ash mature poor 8 3.5 2 >10 u 270 32.4 3296 Moderate Risk
(C)
Ash dieback stage 3 remove 6 Months Not required
34 Ash Mature Poor 11 4 4 >10 u 210 25.2 1994 High Risk (B) Ash dieback stage 3/4 remove 6 Months Not required
G3 Group of Predomintly
sycamore hawthorn and
Ash,
young semi
mature
Moderate
Vigour
0.2-12 .5-12 <10 except for ash C/U 0 0 High Risk (B) G3 consits of a mixture of young/ semi mature native species in
various states,a total of 26 ash trees have been identified with
Ash back these range from levels 2-3 on the ADB scale.
Remove all ash to ensure public saftey due to
proximity of the road replant with another native
species that isnt suseptable to any present disease.
Classifed as High risk due to the amount of
traffic on the road although classed as a
minor road.
4 6 Months Not required
G4 Group of Predomintly
sycamore hawthorn and
Ash,
young semi
mature
Moderate
Vigour
0.2-12 .5-12 C/U 0 0 Moderate Risk
(C)
G3 consits of a mixture of young/ semi mature native species in
various statesof health. A total of 1 ash tree have been identified
with Ash back at level 3,
Remove all ash to ensure public saftey due to
proximity of the road replant with another native
species that isnt suseptable to any present disease.
1 6 Months Not required
Page 76 of 86

Page 77

Page 77 of 86

Page 78

1
Ellie Mills
From: Sheena Devlin on behalf of Conservation
Sent: 27 January 2023 08:40
To: Grant Ballantine; Bee Muskens-Aretos
Subject: FW: Positive representation for TPO order at Land at The Kiln, Quarrybank
From:    
Sent: 26 January 2023 19:22 
To: Conservation <Conservation@midlothian.gov.uk> 
Subject: Positive representation for TPO order at Land at The Kiln, Quarrybank  
CAUTION: This email originated from outside Midlothian Council. Do not click links or open attachments
unless you recognise the sender and know the content is safe. 
Good morning 
I want to say I am glad to see the tree preservation order being put in place for trees at this site, as we have
had woodpeckers and birds of prey utilising the trees on this piece of land and it would be sad to see any of
them be taken down, especially since every tree counts in battling climate change and saving our natural
environment. 
Thanks 
Sent from Outlook for Android
Page 78 of 86

Page 79

1
Ellie Mills
From: Grant Ballantine
Sent: 24 March 2023 12:15
To: Ellie Mills
Cc: Sheena Devlin
Subject: FW: Tree Preservation Order No 1 2023 - Land at Kiln, Quarrybank, Cousland
Hi Ellie, 
 
Can you please review the below representation received on the above.  
 
Thanks, Sheena, for passing on. 
 
Grant 
 
 
Grant Ballantine
Lead Officer Conservation and Environment  
Planning, Sustainable Growth and Investment Service 
Place Directorate  
Midlothian Council 
Fairfield House  
8 Lothian Road 
Dalkeith 
EH22 3ZN 
 
Please note that I work Tuesday to Friday inclusive and am unavailable on Mondays.  
 
Email: grant.ballantine@midlothian.gov.uk 
Website: www.midlothian.gov.uk 
 
We are reviewing the Midlothian Local Development Plan Midlothian Local Development Plan 2 | 
Development plans and policies | Midlothian Council 
If you have any questions about the review, or would like to be added to our MLDP2 mailing list, please 
email LDP@midlothian.gov.uk 
 
From: Sheena Devlin <Sheena.Devlin@midlothian.gov.uk> On Behalf Of Conservation 
Sent: 24 March 2023 11:39 
To: Grant Ballantine <Grant.Ballantine@midlothian.gov.uk> 
Subject: FW: Tree Preservation Order No 1 2023 ‐ Land at Kiln, Quarrybank, Cousland 
 
Sorry Grant, I’m having to send this one to you as I don’t know whether it would be Ellie or Bee, and I know you like 
to be aware sometimes of what’s coming in with this regard. 
 
Thanks  
 
Sheena 
 
From:    
Sent: 21 March 2023 19:45 
To: Conservation <Conservation@midlothian.gov.uk> 
Subject: Tree Preservation Order No 1 2023 ‐ Land at Kiln, Quarrybank, Cousland 
Page 79 of 86

Page 80

2
 
CAUTION: This email originated from outside Midlothian Council. Do not click links or open attachments
unless you recognise the sender and know the content is safe. 
For Attn: Planning Manager 
 
 
Dear Sir/Madam 
 
 
With reference to the above order and relative map, I would like to draw your attention to the group of trees 
marked as G4 and part of G3. 
These are not within the boundary of the land at Kiln, Quarrybank, Cousland, but are within the land at Northfield 
Farm, Cousland. 
There is a gated farm access road off the main road between G3 and G4 which is in constant use for farm vehicles 
and livestock to access fields on either side of the road. To maintain this access safely, I will need to be able to 
manage these trees on a regular basis. 
 
 
Therefore, I would appreciate if you could review the above order with the intention of removing G3 and G4 from 
Tree Preservation Order No 1 2023 
 
 
If you require any further information regarding the above, please do not hesitate to contact me. 
 
 
I look forward to hearing from you in due course. 
 
 
Kind Regards 
 
 
 
 
 
 
 
Sent from Mail for Windows 
Page 80 of 86

Page 81

Planning Committee
Tuesday  16 May 2023
Item No: 5.4
PRE - APPLICATION REPORT REGARDING DEMOLITION OF EXISTING
BUILDINGS AND ERECTION OF NEW COMMUNITY CAMPUS
COMPRISING DENOMINATIONAL AND NON-DENOMINATIONAL
PRIMARY SCHOOL, ADDITION SUPPORT NEEDS (ASN), NURSERY
WITH ASSOCIATED SPORTS PITCHES, PARKING AND ROADWAYS
AND REFUSE STORE AT MAYFIELD NURSERY SCHOOL, STONE
AVENUE, MAYFIELD (23/00245/PAC)
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of the
submission of a Proposal of Application Notice (PAN) and
corresponding pre application consultation for the demolition of existing
buildings (Mayfield Nursey School, Saint Luke’s RC School and
Mayfield Primary School) and erection of new community campus
comprising denominational and non-denominational primary school,
additional support needs (ASN), nursery with associated sports
pitches, parking and roadways and refuse store at Mayfield Nursery
School, Stone Avenue, Mayfield.
1.2 The pre-application consultation is reported to Committee to enable
Councillors to express a provisional view on the proposed major
development. The report outlines the proposal, identifies the key
development plan policies and material considerations and states a
provisional, without prejudice, planning view regarding the principle of
development.
2 BACKGROUND
2.1 Guidance on the role of Councillors in the pre-application process,
published by the Commissioner for Ethical Standards in Public Life in
Scotland, was reported to the Committee at its meeting of 30 August
2022. The guidance clarifies the position with regard to Councillors
stating a provisional view on proposals at pre-application stage.
2.2 A pre-application consultation for demolition of existing buildings and
erection of new community campus comprising denominational and
non-denominational primary school, ASN, nursery with associated
sports pitches, parking and roadways and refuse store at Mayfield
Nursery School, Stone Avenue, Mayfield was submitted on 3 April
2023.  The applicant is Midlothian Council.
Page 81 of 86

Page 82

2.3 As part of the pre-application consultation process, two public events
are scheduled to be held at Mayfield Primary School.  The first is on
Thursday 27 April 2023 and the second is still to be confirmed; these
meetings were/will be advertised via the Midlothian Advertiser, social
media, the issuing of media release and on the local community radio
(at least 7 days prior to each event).  Furthermore, promotional posters
have been displayed at Newbattle High School, the leisure centre and
library and are also to be posted within local shops.  Upon the
conclusion of the public events the applicant could submit a planning
application for the proposal. 
2.4 An applicant must wait 12 weeks from the date of submission of a PAN
before submitting a planning application.  The earliest date that the
planning application for this proposal could be submitted is 27 June
2023. The subsequent planning application must be accompanied by a
Pre Application Consultation Report detailing the consultation
undertaken, a summary of written responses and views expressed at
the public events, and explanation of how the applicant took account of
the views expressed and an explanation of how members of the public
were given feedback on the applicant’s consideration of their views. 
2.5 Copies of the pre application notices have been sent by the
prospective applicant to the local elected members in Ward 5 -
Midlothian East and Mayfield, Easthouses Community Council, the
Mayfield Parents Council, the St Lukes Parents Council, Owen
Thompson MP, Colin Beattie MSP and Christine Grahame MSP. 
2.6  It is reasonable for an Elected Member to attend one of the events
without a Council planning officer present, but the Member should (in
accordance with the Commissioner’s guidance reported to the
Committee at its meeting in August 2022) not offer views, as the forum
for doing so will be at meetings of the Planning Committee. 
3 PLANNING CONSIDERATIONS 
3.1  In assessing any subsequent planning application the main planning
issue to be considered in determining the application is whether the
proposed development complies with development plan policies unless
material planning considerations indicate otherwise. 
3.2 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan (2017).  
3.3 The application site comprises a primary school, nursery, associated
buildings, parking and large areas of grass and hardstanding.  The site
is located within a primarily residential area within the built-up area of
Mayfield and is surrounded by residential dwellinghouses on all sides. 
The main vehicular access to the site is taken from Stone Avenue.   
3.4 The relevant policies of the Midlothian Local Development Plan 2017
(MLDP) are DEV2 – Protecting Amenity within the Built-Up Area; DEV5
– Sustainability in New Development; DEV6 – Layout and Design of
Page 82 of 86

Page 83

New Development; DEV7 – Landscaping in New Development; DEV9
– Open Space Standards; TRAN5 – Electric Vehicle Charging; IT1 –
Digital Infrastructure; ENV7 – Landscape Character; ENV9 – Flooding,
ENV10 – Water Environment; and, ENV15 – Species and Habitat
Protection and Enhancement. 
3.5 The relevant policies of the National Planning Framework 4 (NPF4) are
Policy 1 - Tackling the climate and nature crises; Policy 2 - Climate
mitigation and adaptation; Policy 3 – Biodiversity; Policy 14 - Design,
quality and place; Policy 15 - Local Living and 20 minute
neighbourhoods; and, Policy 21 - Play, recreation and sport. 
3.6 The views of consultees and representors will be material
considerations in the assessment of an application for the proposed
development. 
3.7 The site is within the built-up area of Mayfield and is used for
educational purposes and as such there is a presumption in favour of
appropriate re-development of the site to provide enhanced education
and community facilities.  Detailed consideration will have to be given
to design matters, in particular the site layout, the siting, design and
appearance of buildings and other structures, the materials used,
landscaping, open space, parking, biodiversity and sustainability, in
order to ensure compliance with sustainable place-making policies
within the MLDP and NPF4.  It will also be necessary to give careful
consideration to the impact of the proposed development on the
amenity of neighbouring residents, as well as transport and active
travel arrangements. 
4 PROCEDURES 
4.1  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures provides for Councillors to express a
‘without prejudice’ view and to identify material considerations with
regard to a major application. 
4.2  The Committee is invited to express a ‘without prejudice’ view and to
raise any material considerations which they wish the applicant and/or
officers to consider.  Views and comments expressed by the
Committee will be entered into the minutes of the meeting and relayed
to the applicant for consideration. 
4.3  The Scottish Government’s Guidance on the Role of Councillors in
Pre-Application Procedures advises that Councillors are expected to
approach their decision-making with an open mind in that they must
have regard to all material considerations and be prepared to change
their views which they are minded towards if persuaded that they
should. 
Page 83 of 86

Page 84

5 RECOMMENDATION 
5.1 It is recommended that the Committee notes:
a) the provisional planning position set out in this report; 
b) that any comments made by Members will form part of the minute 
of the Committee meeting; and 
c) that the expression of a provisional view does not fetter the 
Committee in its consideration of any subsequent formal planning 
application. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:    9 May 2023
Application No:   23/00245/PAC
Applicant:   Midlothian Council
Agent:    JM Architects
Validation Date:  03 April 2023
Contact Person:  Whitney Lindsay
Email:    Whitney.Lindsay@midlothian.gov.uk
Page 84 of 86

Page 85

File No.
1:2,500Scale:
Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. 100023416 (2018) ±
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Education, Economy
& Communities Community campus including primary school
Mayfield Nursery School, Stone Avenue, Mayfield
23/00245/PAC
Page 85 of 86

Page 86