Agenda Document Pack - Planning Committee - 24/03/2025

Midlothian Council · 24 March 2025
Back to Planning Committee — 24 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Planning Committee 
Venue:  Council Chambers/Hybrid, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Monday, 24 March 2025 
Time:  14:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 64

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting 
No items for discussion 
5          Public Reports
5.1 25/00079/DPP - Mayfield Primary School Report and Plans 3 - 25
5.2 24/00415/DPP - Beeslack High School Report and Plans 26 - 64 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 29 April 2025. 
Page 2 of 64

Page 3

Planning Committee
Monday 24 March 2025
Item No. 5.1
APPLICATION FOR PLANNING PERMISSION 25/00079/DPP FOR THE
DEMOLITION OF EXISTING SCHOOL AND THE ERECTION OF
COMMUNITY CAMPUS COMPRISING OF PRIMARY SCHOOL AND
NURSERY, FORMATION OF SPORTS PITCHES, ROADS AND CAR
PARKING AND ASSOCIATED WORKS AT THE SITE OF THE MAYFIELD
PRIMARY SCHOOL, STONE AVENUE, MAYFIELD, DALKEITH  
Report by Chief Officer Place
1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1  The application is for the demolition of existing school and the
erection of community campus comprising of primary school and
nursery, formation of sports pitches, roads and car parking and
associated works at the site of the Mayfield Primary School, Stone
Avenue, Mayfield.
1.2  There have been two representations and consultation responses
from the Mining Remediation Authority (previously the Coal
Authority), Sport Scotland, the Council’s Ecological Advisor
(TWIC), the Council’s Senior Manager Neighbourhood Services
(Roads) and the Council’s Senior Manager Protective Services
(Environmental Health).
1.3  The relevant development plan policies are policies 1, 2, 3, 6, 9,
13, 14, 15, 21, 22 and 23 of the National Planning Framework 4
(NPF4) and policies DEV2, DEV5, DEV6, DEV7, DEV8, DEV10,
TRAN1, TRAN5, ENV9, ENV10, ENV11, ENV15, ENV16, ENV18, and
IMP3 of the Midlothian Local Development Plan 2017 (MLDP).
1.4  The recommendation is to grant planning permission subject to
conditions.
2 LOCATION AND SITE DESCRIPTION
2.1 The application site measures approximately 5.1 hectares and
comprises a joint campus for the Mayfield Primary School, St Lukes
RC Primary School, Mayfield Nursery and Midlothian Sure Start
(Mayfield Family Learning Centre) along with associated car parking
and playing fields.  The site also previously contained a library
(relocated to the Newbattle High School). The existing buildings are a
mix of three storey, two storey and single storey structures.
Page 3 of 64

Page 4

2.2 The school building is located to the northeast corner of the site and
organised along a broadly symmetrical axial design incorporating the
two primary schools, with the nursery facilities housed within a
separate building and temporary accommodation situated to the west
of the site.  The southern half of the site comprises the schools grass
playing fields and tarmac playground. This part of the site is at a lower
level than the northern part of the site which houses the buildings and
car parking.  There are three veteran trees located in the centre of the
site to the south. 
2.3 The site is situated in a predominantly residential area comprising
dwellinghouses and flats.  The main vehicle access to the site is taken
from Stone Avenue to the north, with a separate service vehicle access
via Beechgrove Road to the northeast corner of the site.  Pedestrian
access to the site is taken from Stone Place to the west or Bevan Road
to the east. 
3 PROPOSAL
3.1 It is proposed to erect a new community campus comprising of primary
schools and nursery; formation of sports pitches, roads and car parking
and associated works; the development proposal will replace the
existing school and nursery facilities on site. 
3.2 The new community campus will provide a non-denominational primary
school accommodating up to 701 pupils across the two primary
schools, an Additional Support Needs (ASN) facility for 24 pupils and
an early learning facility for 100 pupils in addition to community
facilities. The community campus also includes the following outdoor
facilities:
• A grass seven-a-side football pitch.
• A full-sized 3G (third generation synthetic surface) football pitch.
• Basketball court.
• Garden allotment area.
• Community garden.
• Play Park area.
• Pump-track.
3.3 A two phased approach is to be taken to the re-development of the site
so as to ensure the existing school and nursery remain open.
• Phase 1 will see the southern half of the site being blocked off to
enable the erection of the community campus building, the
formation of a new vehicle access from Stone Place and
associated pedestrian access connections and landscaping to
the southern half of the site; and
• Phase 2 will see the demolition of the existing school and
nursery building to the northern half of the site and formation of
the sports pitches, remaining car parking, pedestrian access
Page 4 of 64

Page 5

connections, pump track, community allotments, landscaping
and other associated works. 
3.4 The community campus building is an elongated ‘U’ plan, two-storey
building with single storey ends, with the early years and ASN provision
being located at either single storey end and the two primary schools
and the community facilities being located within the main two storey
section.  The eastern single storey wing will serve the ASN and the
western wing will serve the early years provision.
3.5 The external walls are to be finished in red/brown coloured brick with
sections of bronze coloured profiled aluminium cladding.  The windows
and doors will be bronze coloured aluminium framed.  The roofs will be
a mix of shallow pitches, finished with dark grey single ply membrane
and very shallow pitches behind low parapet walls.
3.6 The proposal includes improvements to the vehicle and pedestrian
access connections to the site.  The main vehicle access to the site is
to be taken from Stone Place and will provide access to parking 43
spaces (33 standard, 6 EV and 4 accessible) situated to the north of
the community campus. The access taken from Stone Avenue is to be
retained and will provide access to 31 parking spaces serving the
pitches and allotments. 
3.7 The main pedestrian approach will be taken through the park at the
junction of Stone Place and Dougall Place.  The separate pedestrian
accesses will be via Stone Avenue to the north, Stone Place to the
west, Dougall Place to the south and Bevon Road to the east. 
3.8 The applicant confirmed that there will be no significant road closures
proposed during construction. There will be some local Traffic
Management to enable the entrance junction works on Stone Avenue
to be completed.  
3.9 The application is accompanied by:
• Design and Access Statement;
• Drainage Strategy Report;
• Flood Risk Assessment;
• Geotechnical Design and Environmental Risk Assessment
Report;
• Landscape Statement;
• Pre-Application Consultation Report;
• Preliminary Ecological Assessment;
• Tree Survey;
• Transport Statement;
• Arboricultural Impact Assessment;
• Tree and Hedgerow Protection Methodology; and
• Sports Pitch Noise Impact Assessment.
Page 5 of 64

Page 6

4 BACKGROUND
4.1 Planning permission 23/00599/DPP for the demolition of existing
school and erection of community campus comprising of primary
school and nursery; formation of sports pitches, roads and car parking
and associated works was granted planning permission subject to
conditions by the Planning Committee at its meeting of June 2024. This
permission remains extant. 
4.2 The applicant carried out a pre application consultation
(23/00245/PAC) for the proposal of application notice for demolition of
existing buildings and erection of new community campus comprising
denominational and non-denominational primary school, ASN, nursery
with associated sports pitches, parking and roadways and refuse store
in April and June 2023. The pre application consultation was reported
to the Committee at its meeting in May 2023. The Planning Committee
requested the following actions:
1. Consideration of the demolition of the garages on Stone Place to
create an access point;
2. An appropriate drop-off point needs to be designed; and
3. Ensure there is appropriate levels of parking.
4.3 Planning permission 18/00225/DPP for the siting of portakabin to
provide additional nursery accommodation was granted in June 2018.
This consent was implemented.
4.4 As part of the assessment of the current application the planning
authority issued a screening opinion for the current proposals on 7
November 2023. The screening opinion confirmed that an
Environmental Impact Assessment (EIA) was not required. 
4.5 The application site area exceeds two hectares.  The application
therefore constitutes a ‘Major Development’ as defined in the Town and
Country Planning (Hierarchy of Developments) (Scotland) Regulations
2009 and thereby it requires to be determined by the Committee. 
5 CONSULTATIONS
5.1 The Coal Authority (also known as the Mining Remediation
Authority) does not object to the application. It has been demonstrated
that the site is safe and stable for the proposed development.
5.2 Sports Scotland does not object to the application subject to a
condition being attached to any grant of planning permission securing
details of the sports pitch specification. Sport Scotland recommend that
further consideration is given to the minimum levels of provision as set
out within Sport Scotland’s School Playing Fields Planning and Design
Guidance.
Page 6 of 64

Page 7

5.3 The Council’s Senior Manager Neighbourhood Services (Roads)
does not object to the application but noted that pedestrian access
near 19 Stone Place could be improved by being more direct. 
5.4 The Council’s Senior Manager Neighbourhood Services (Roads)
also provided comment on the Flood Risk Assessment and noted that
there are some existing minor pluvial flooding issues on site, however
this is due to localised topography and outdated drainage infrastructure
on site. The Surface Water drainage will be enhanced with the
provision of SUDS and that the risk of flooding on the site is low. 
5.5 The Council’s Senior Manager Protective Services reviewed the
revised layout of the sports pitches along with the updated New
Acoustics Report (Addendum to Sports Pitch Noise Impact
Assessment, MLC Mayfield, Dalkeith, Midlothian – Report Ref: 7611-
04-00 dated 05th February 2025) and are satisfied with the comments
and conclusions made.  Based on the revised layout and predicted
noise levels at the nearest noise sensitive receptors, there is no
requirement for any noise mitigation measures.  It is recommended that
conditions are included in the planning permission, if granted, relating
to lighting, contaminated land, construction environment management
plan and fixed plant noise. 
5.6 The Scottish Environment Protection Agency (SEPA) offered no
response to the current planning applications. However, it is noted that
SEPA provided a response to the previous similar planning application,
23/00599/DPP; SEPA did not object to the application and advised that
whilst the development is defined as a major development, it does not
meet the threshold for SEPA to be consulted. In this instance SEPA’s
standing advise is applicable, which outlines best practice, for those
developments or aspects of developments considered to be low risk. 
5.7 The Councils Ecological Advisor - The Wildlife Information Centre
(TWIC) does not object to the proposal (based on their comments on
application 23/00599/DPP) and advised that the Preliminary Ecological
Assessment (PEA) identifies that there will be no effects on protected
species or habitats and includes recommendations for biodiversity
enhancement and the avoidance of vegetation removal during bird
breeding season. 
5.8 Scottish Water offered no response to the current planning
applications. However, it is noted that Scottish Water provided a
response to the previous similar planning application, 23/00599/DPP;
Scottish Water did not object to the application. The water supply will
be fed from Rosebery Water Treatment Works. The foul water drainage
will be dealt with by the Edinburgh PFI Waste Water Treatment Works.
Both have sufficient capacity at present; however it is not possible to
reserve capacity for future developments. For reasons of sustainability
and to protect Scottish Water customers from potential future sewer
flooding, Scottish Water will not accept any surface water connections
Page 7 of 64

Page 8

into the combined sewer system. There may be limited exceptional
circumstances where they would allow such a connection for
brownfield sites only, however this will require significant justification
from the customer taking account of various factors including legal,
physical and technical challenges. In order to avoid costs and delays
where a surface water discharge to the combined sewer system is
anticipated, the developer should contact Scottish Water at the earliest
opportunity with strong evidence to support the intended drainage plan
prior to making a connection request (this is separate regulatory
process between the applicant and Scottish Water). 
5.9 Mayfield and Easthouses Community Council (MECC) does not object
to the application and are generally supportive of the planning
application but made some suggestions with regards to occupancy and
the use of space.  The comments are summarised as follows:
• Supportive of the new school campus being provided in a similar
location to the existing campus; 
• Disappointed by the reduction in the footprint of the building
(when compared the previous scheme) but aware of the cost and
inflation reasons; 
• The after school club should be afforded a permanent space; 
• Suggested that the community are consulted on the possibility of
the community space use being removed from the proposal and
the space being used for the after school club. 
6 REPRESENTATIONS 
6.1 There have been two representations received, which can be viewed in
full on the online planning application case file.  One representation
objected and one representation neither objected to nor supported the
application.  A summary of the main points raised are as follows: 
• The developments potential safety and environmental impacts
on existing housing/residents within the 20-metre buffer zone
during construction; and
• The potential need for parking restrictions, limiting parking for
existing residents, as a consequence of the new access
arrangements – there are already some on-street parking
restrictions in place. 
6.2 The above matters will be addressed within the planning issues section
of the report. 
7 PLANNING POLICY 
7.1 Planning policy currently comprises of National Planning Framework 4
and the adopted Midlothian Local Development Plan 2017. 
7.2 The following policies are relevant to the proposal: 
Page 8 of 64

Page 9

National Planning Framework 4 (NPF4) 
7.3  Policy 1 Tackling the climate and nature crisis; sets out to
encourage, promote and facilitate development that addresses the
global climate emergency and nature crisis. 
7.4  Policy 2 Climate mitigation and adaptation; sets out to encourage,
promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change. 
7.5  Policy 3 Biodiversity; sets out to protect biodiversity, reverse
biodiversity loss, deliver positive effects from development and
strengthen nature networks. 
7.6  Policy 6 Forestry, woodland and trees; sets out to protect and
expand forests, woodland and trees. 
7.7  Policy 9 Brownfield, vacant and derelict land and empty buildings;
sets out to encourage, promote and facilitate the reuse of brownfield,
vacant and derelict land and empty buildings, and to help reduce the
need for greenfield development. 
7.8  Policy 13 Sustainable transport; sets out to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to travel
unsustainably. 
7.9  Policy 14 Design, quality and place; sets out to encourage, promote
and facilitate well designed development that makes successful places
by taking a design-led approach and applying the Place Principle. 
7.10 Policy 15 Local Living and 20 minute neighbourhoods; sets out to
encourage, promote and facilitate the application of the Place Principle
and create connected and compact neighbourhoods where people can
meet the majority of their daily needs within a reasonable distance of
their home, preferably by walking, wheeling or cycling or using
sustainable transport options. 
7.11  Policy 21 Play, recreation and sport; sets out to encourage, promote
and facilitate spaces and opportunities for play, recreation and sport. 
7.12  Policy 22 Flood risk and water management; sets out to strengthen
resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to
flooding. 
7.13  Policy 23 Health and safety; sets out to protect people and places
from environmental harm, mitigate risks arising from safety hazards
and encourage, promote and facilitate development that improves
health and wellbeing. 
Page 9 of 64

Page 10

Other National Policy 
7.14  Designing Places, A Policy Statement for Scotland sets out the six
key qualities which are at the heart of good design namely identity,
safe and pleasant environment, ease of movement, a sense of
welcome, adaptability and good use of resources. 
7.15  The Scottish Government’s Policy on Architecture for Scotland
sets out a commitment to raising the quality of architecture and design. 
Midlothian Local Development Plan 2017 (MLDP) 
7.16  Policy DEV2: Protecting Amenity within the Built-Up Area states
that development will not be permitted within existing and future built-
up areas where it is likely to detract materially from the existing
character or amenity of the area. 
7.17  Policy DEV5: Sustainability in New Development sets out the
requirements for development with regards to sustainability principles. 
7.18  Policy DEV6: Layout and Design of New Development states that
good design and a high quality of architecture will be required in the
overall layout of development proposals. This also provides guidance
on design principles for development, materials, access, and passive
energy gain, positioning of buildings, open and private amenity space
provision and parking. 
7.19  Policy DEV7: Landscaping in New Development requires
development proposals to be accompanied by a comprehensive
scheme of landscaping. The design of the scheme is to be informed by
the results of an appropriately detailed landscape assessment. 
7.20  Policy DEV8: Open Spaces states that the Council will seek to protect
and enhance the open spaces identified on the Proposals Map.
Development will not be permitted in these areas that would: 
A. Result in a permanent loss of the open space; and/or 
B. Adversely affect the accessibility of the open space; and/or 
C. Diminish the quality, amenity or biodiversity of the open
space; and/or 
D. Otherwise undermine the value of the open space as part of
the Midlothian Green Network or the potential for the
enhancement of the open space for this purpose. 
7.21  Policy DEV10: Outdoor Sports Facilities seeks to protect outdoor
sports facilities from re-development except in certain circumstances:
where the proposed development is ancillary to the principle use of the
site as an outdoor sports facility; the loss is only minor and would not
affecting its overall use; the outdoor sports facility is to be replaced
either by a new facility of comparable or greater benefit for sport or
Page 10 of 64

Page 11

upgrading of an existing facility on the same site or nearby; or where
the sports pitch needs assessment, open space audit and consultation
with SportScotland identify a clear excess of provision to meet the
existing or anticipated demand in the area and the overall quality of
provision in the locality will be maintained. 
7.22 Policy TRAN1: Sustainable Travel aims to encourage sustainable
modes of travel.
7.23  Policy TRAN5: Electric Vehicle Charging seeks to support and
promote the development of a network of electric vehicle charging
stations by requiring provision to be considered as an integral part of
any new development or redevelopment proposals. 
7.24  Policy ENV9: Flooding presumes against development which would
be at unacceptable risk of flooding or would increase the risk of
flooding elsewhere. It states that Flood Risk Assessments will be
required for most forms of development in areas of medium to high
risk, but may also be required at other locations depending on the
circumstances of the proposed development. Furthermore it states that
sustainable urban drainage systems will be required for most forms of
development, so that surface water run-off rates are not greater than in
the site’s pre-developed condition, and to avoid any deterioration of
water quality. 
7.25  Policy ENV10: Water Environment requires that new development
pass surface water through a sustainable urban drainage system
(SUDS) to mitigate against local flooding and to enhance biodiversity
and the environment. 
7.26  Policy ENV11: Woodland, Trees and Hedges states that
development will not be permitted where it could lead directly or
indirectly to the loss of, or damage to, woodland, groups of trees
(including trees covered by a Tree Preservation Order, areas defined
as ancient or semi-natural woodland, veteran trees or areas forming
part of any designated landscape) and hedges which have a particular
amenity, nature conservation, biodiversity, recreation, landscape,
shelter, cultural, or historical value or are of other importance. 
7.27  Policy ENV15: Species and Habitat Protection and Enhancement
presumes against development that would affect a species protected
by European or UK law. 
7.28  Policy ENV16: Vacant, Derelict and Contaminated Land supports
the redevelopment of vacant and derelict land for uses compatible with
their location. Developments will be required to demonstrate that the
site is suitable for the proposed new use in terms of the risk posed by
contamination and instability from historic uses. 
Page 11 of 64

Page 12

7.29  Policy ENV18: Noise requires that where new noise sensitive uses are
proposed in the locality of existing noisy uses, the Council will seek to
ensure that the function of established operations is not adversely
affected. 
7.30  Policy IMP3: Water and Drainage require sustainable urban drainage
systems (SUDS) to be incorporated into new development. 
8 PLANNING ISSUES 
8.1 The main planning issue to be considered in determining this
application is whether the proposal complies with development plan
policies unless material planning considerations indicate otherwise.
The representations and consultations responses received are material
considerations. 
Principle of development 
8.2 The site is within the built-up area of Mayfield and is currently used for
educational purposes and as such there is a presumption in favour of
appropriate re-development of the site to provide enhanced education
and community facilities, where the proposed community campus
would be compatible to the neighbouring land uses, subject to the
details of the proposed development complementing the character of
the area and protecting the amenity of existing neighbouring properties. 
The representation and consultation responses have not identified any
material considerations which outweigh this presumption in favour of
development. 
8.3 As stated in section 4 of this report, planning permission was granted in
2024 for the demolition of existing school and erection of community
campus comprising of primary school and nursery, formation of sports
pitches, roads and car parking and associated works. The current
proposal sees a revised layout, a reduction in the footprint and height
of the campus building, a reduction in parking spaces and a reduction
in the size of pitches as compared to the already approved proposal in
terms of planning application 23/00599/DPP. 
8.4 The application site comprises land that currently accommodates the
school building, nursery building, the car park and a grass pitch, MUGA
and hard surface playground and grassed open space. The site will see
the formation of grass 7-a-side football pitch, full sized 3G football
pitch, basketball court, pump track, play park area, wooded area,
community garden and allotments which is a betterment of the current
facilities available and increases the playing and community capacity at
the school. Furthermore, the provision of a range of new sports pitches
and other facilities will diversify the sporting provision available.  The
proposal is therefore compliant with MLDP policies DEV8 and DEV10. 
Page 12 of 64

Page 13

8.5 With regard NPF4, although the site is currently occupied by a primary
school and nursery, consideration still needs to be given to the site’s
location in terms of sustainability.  In this regard the site is within close
proximity to areas of high population, public transport options and
active travel connections and as such is considered to be a sustainable
location in compliance with NPF4. 
Layout, Form, Design and Materials 
8.6 The re-development of the existing site looks to improve accessibility to
the site whilst also improving educational and community facilities
within the area.  A two phased approach is to be taken to the re-
development of the site; this sees the community campus being
erected to the southern half of the site and the northern half of the site
eventually hosting sports pitches, community garden, allotments and
parking. 
8.7 The community campus is an elongated ‘U’ plan, two storey building
with single storey wings at either end, with the early years and ASN
provision being located at either end and the two primary schools being
located at either side of the central section which will also host the
community facilities. The layout provides an obvious principal elevation
facing towards the car park and a more private courtyard space
enclosed on three sides around a veteran tree that is to be retained.
The rooms will benefit from generous provision of natural light from
large areas of window space. 
8.8 The external walls will be clad with red/brown coloured brick and
bronze coloured profiled aluminium cladding. The building will contain a
large amount of bronze coloured aluminium framed windows. The
building comprises of a mix of shallow roof pitches which are hidden
behind low parapet wall when viewed externally the building will
visually read as a flat roof building.  Overall, the community campus
building will have a contemporary appearance further enhanced by a
contemporary palette of materials. This approach will ensure the
building is a landmark structure in the locality, whilst by means of its
hight and orientation on the site it will sit comfortably in the local
townscape. 
8.9 The revised layout, when compared to the existing layout, moves the
car parking and vehicle access from the north and northwest of the
building to the east and north of the building.  This allows for
accessibility to the site to be enhanced whilst also creating an attractive
external learning space. The setting of the building will be enhanced by
sympathetic hard and soft landscaping.  Overall, in terms of layout,
form and design, the development proposal maximises accessibility
whilst respecting the surrounding character and appearance of the
area. 
Page 13 of 64

Page 14

Landscaping and Veteran Trees 
8.10 Prior to the area’s development as a residential community with
associated schools and community facilities, the area comprised fields,
hedgerows and hedgerow trees as part of Mayfield Farm.  The farm,
along with the semi natural ancient woodland of Bryans Wood, created
a green network connection across the area.  The stone-built
farmhouse can still be seen close to the school site, and several
mature trees, including the Sycamores on the school site and the
remnant hedgerow, and trees on the McSence business park remain
as markers of the site’s former agricultural and rural setting. 
8.11 The trees on the McSence business park are of similar age and stature
to the trees within the school and were protected in 1986 by Tree
Preservation Order no 2 of 1986.  The trees within the school site were
not included within the TPO as the site is owned by the Council, and
TPOs are reserved for land where the Council would otherwise not
have the powers to ensure the trees were protected.  However, the
existence of the TPO does demonstrate the value placed on mature
former farmland trees in the setting, amenity, and cultural history of the
local area.  The veteran sycamore trees within the school site are
widely visible locally and are seen from within the grounds with the
backdrop of the Pentland Hills to the rear, providing significant visual
and landscape amenity to the local area. 
8.12 The contribution of mature trees to carbon capture biodiversity and
other ecosystem services such as water management and air quality is
now widely understood and the removal of veteran and mature trees
conflicts with Council and Scottish Government policies related to
deforestation, climate action and addressing the twin threats of the
Climate Emergency and Nature Crisis 
8.13 The re-development of the site will see the removal of a veteran tree
which is contrary to policy.  Various discussions were had with the
applicants regarding the loss of the veteran tree, and it was evidenced
that the site layout was dictated by numerous site constraints and the
loss of one veteran tree was unavoidable. 
8.14 As a consequence the landscape plans have evolved to increase tree
and woodland canopy cover across the site in-line with a requirement
of 21% Tree and Woodland Canopy Cover set out in Midlothian's
Climate Change Strategy.  The percentage is calculated as the area of
tree and woodland canopy as a percentage of the site area within the
red line boundary.  The applicant advised that whilst 21% percent
canopy cover cannot be achieved in this instance, the revised layout
should achieve a 13% canopy cover on the site, and that further
increases are not possible as open areas need to be retained for
children to use at playtime. 
Page 14 of 64

Page 15

8.15 Whilst the general landscape layout is acceptable, the planting details
and specification notes are not acceptable (in detail and specification). 
Therefore, a condition should be attached to any grant of planning
permission requiring revised details to be submitted, so as to ensure
that the proposed landscaping provides positive effects for biodiversity
and enhances the development and character and appearance of the
area. 
8.16 Overall, whilst the loss of a single veteran tree is disappointing and
contrary to policy, it is considered that this does not outweigh the
positive merits (the provision of new schools and community facilities)
of the development proposal as a whole.  Furthermore, it is noted, that
measures will be put in place to protect the other two veteran trees and
ensure that an adequate level of compensatory planting is included that
contributes towards biodiversity, habitats and landscaping.  If planning
permission is granted these details can be secured by condition.   
Access and transportation 
8.17 The proposed community campus will see the nursery school roll
increase by 60 pupils from 40 to 100, and the roll for the primary
schools increase by 232 pupils from 469 to 701.  Furthermore, there
will be an additional 24 pupils associated with the ASN facility.  The
staff numbers will increase from 67 to 83.  It is noted that this increase
will occur gradually over the life of the campus as planned housing in
the area is completed. 
8.18 The proposed community campus will see an increase in the available
parking spaces, from 35 spaces currently to 74 spaces to
accommodate the increase in capacity and staffing.  The phased
construction will see parking increase from 43 spaces to 74 spaces –
increasing gradually as the capacity of pupils and staffing increases. 
8.19 The existing school lies within an established residential area and so
the existing pedestrian facilities are well established.  Footways are
generally 2m wide with dropped kerb crossings at major junctions.  At
the existing school entrance on Stone Avenue there is a raised table
crossing with additional street furniture and bollards.  The principal
vehicular access is to be taken from Stone Place; this will improve
accessibility by car and road/pedestrian safety. 
8.20 The surrounding residential streets are traffic calmed and lightly
trafficked, making them conducive for use by cyclists.  Further afield,
there are no dedicated cycle routes nearby, though the Midlothian
Cycle Map indicates that the nearest off-site cycle route is on the
B6482 to the west of the school. 
8.21 The nearest bus stops to the application site are located on Bogwood
Road, approximately 200m to the east of the campus. There are also
stops on Eskview Road, approximately 300m to the north.  Both sets of
Page 15 of 64

Page 16

bus stops are served by routes 48 and X33 operated by Lothian Buses
with a 30-minute frequency. 
8.22 The proposed community campus includes enhancements to the
pedestrian and cycle access points by upgrading the three existing
pedestrian links and introducing an additional two new links.  The
proposal includes cycle parking for pupils, staff and visitors in
accordance with current Midlothian Council standards, which will
encourage the switch to active travel modes and therefore complies
with MLDP policy TRAN1 and NPF4 policy 13. 
8.23 The Council’s Senior Manager Neighbourhood Services (Roads)
offered no objection and noted that the layout has improved from the
previous scheme with the parking being sensitively sited. 
8.24 The proposed layout results in an increase in permeable areas when
compared to the current school site layout. There are some existing
minor pluvial flooding issues on site, however this is due to localised
topography and outdated drainage infrastructure on site. The surface
water drainage will be enhanced with the provision of a sustainable
urban drainage system (SUDS). 
Residential amenity 
8.25 The re-development of the site results in the location of the building/s
and playing fields switching.  The proposed location of the community
campus does not raise concerns in terms of overlooking,
overshadowing or overbearing due to on-site separation distances. 
The revised location of the outdoor sport/play facilities (seven a-side
football pitch and 3G MUGA pitch) means that there is potential for
some impact on residential amenity. 
8.26 The applicant arranged for a sports pitch noise assessment to be
completed and submitted. The submitted sports pitch noise impact
assessment concluded that the predicted noise levels from all three
sports pitches now achieve the 50dBA Sport Scotland lower target
level at all of the nearest noise sensitive receptors without need for
barrier mitigation. The Council’s Senior Manager Protective Services
agreed with these conclusions.   
8.27 It is the ‘norm’ for modern schools in urban areas to have MUGA
pitches and residential amenity can be safeguarded via use of acoustic
barriers to mitigate noise if required and detailed design of lighting
shields and directions.  Such measures can be secured via conditions
on the grant of planning permission and by the Council operating as a
good neighbour. 
8.28 Overall, the site has a long history of education and community uses
and the impact on the amenity of existing residential neighbours will be
comparable to the existing situation.
Page 16 of 64

Page 17

Other Matters 
8.29  A representation on the application raised concerns relating to the
potential impact of the development on the safety and environmental
amenity of the existing housing during construction.  It is acknowledged
that construction works can be disruptive and in response it is
proposed that a condition is attached to any grant of planning
permission requiring a Construction Environment Management Plan to
be submitted to the planning authority for approval so as to control the
construction activity on the site, ensure environmental impact during
the construction period is at an acceptable level and to ensure
appropriate mitigation is in place. 
8.30 A representation on the application raised concerns regarding the
proposed access at Stone Place in terms of the potential for parking
restrictions.  The Council’s Senior Manager Neighbourhood Services
(Roads) noted that cars currently park in the layby next to the proposed
access off Stone Place and have confirmed that cars should still be
able to park on the road.  It is worth noting that any future consideration
of on-street parking restrictions are out with the scope of Planning. 
9 RECOMMENDATION 
9.1 That planning permission be granted for the following reason: 
The site is located within the settlement boundary of Mayfield and on a
site with an established educational and community use and as such
there is presumption in favour of an appropriate educational and
community use development. The proposed detailed scheme of
development in terms of its layout, form, design and landscape
framework is acceptable and as such accords with development plan
policies. The presumption for development is not outweighed by any
other material considerations. 
Subject to the following conditions: 
1.  The development to which this permission relates shall
commence no later than the expiration of three years beginning
with the date of this permission. 
Reason: To accord with the provisions of Section 58 of the Town
and Country Planning (Scotland) Act 1997 (as amended by the
Planning (Scotland) Act 2019). 
2.  The development shall not begin until a scheme to deal with any
contamination of the site has been submitted to and approved by
the planning authority. The scheme shall contain details of the
proposals to deal with any contamination and include: 
i.  the nature, extent and types of contamination on the site; 
Page 17 of 64

Page 18

ii. measures to treat or remove contamination to ensure that
the site is fit for the uses hereby approved, and that there is
no risk to the wider environment from contamination
originating within the site;
iii. measures to deal with contamination encountered during
construction work; and
iv. the condition of the site on completion of the specified
decontamination measures.
3. On completion of any required decontamination/ remediation
works, referred to in Condition 2, and prior to any part of the
building being occupied for its approved use, a validation report
shall be submitted to the planning authority confirming that the
works have been carried out in accordance with the approved
scheme. No part of the building shall be occupied unless or until
the planning authority have approved the required validation.
Reason for conditions 2 and 3: To ensure that any
contamination on the site is adequately identified and that
appropriate decontamination measures are undertaken to mitigate
the identified risk to site users and construction workers, built
development on the site, landscaped areas, and the wider
environment.
4. Notwithstanding the plans and supporting statements hereby
approved, the proposed softworks landscaping layout detailed on
drawing no. MFCC-RFL-ZZ-ZZ-DR-L-000004 Rev P10 are hereby
not approved. Development shall not begin until a scheme of hard
and soft landscaping has been submitted to and approved in
writing by the planning authority. Details of the scheme shall
include:
i. existing and finished ground levels and floor levels for all
buildings, roads, parking areas and paths in relation to a
fixed datum;
ii. existing trees, landscaping features and vegetation to be
retained; removed, protected during development and in
the case of damage, restored;
iii. proposed new planting including trees, shrubs, the wee
forest, hedging and grassed areas;
iv. location and design of any proposed walls, fences and
gates, including those surrounding bin stores or any other
ancillary structures;
v. schedule of plants to comprise species, plant sizes and
proposed numbers/density; vi programme for completion
and subsequent maintenance of all soft and hard
landscaping including existing trees to be retained. The
landscaping shall be completed prior to the development
being occupied. Any tree felling or vegetation removal
proposed as part of the landscaping scheme shall take
Page 18 of 64

Page 19

place out with the bird breeding season (March- August);
unless a suitably qualified ecologist has carried, out a
walkover survey of the felling/removal area in the 48 hours
prior to the commencement of felling/removal, and
confirmed in writing that no breeding birds will be affected;
vi.  proposed car park configuration and surfacing;
vii.  details of the location, design, height and specification of
proposed street lighting within the development;
viii.  proposed footpaths and cycle paths within the site; and
ix.  proposed cycle parking facilities. 
All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as
the programme for completion and subsequent maintenance (v).
Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of the completion
of the development shall be replaced in the following planting
season by trees/shrubs of a similar species to those originally
required. 
Reason: To ensure the quality of the development is enhanced
by landscaping to reflect its setting in accordance with policy
DEV7 of the Midlothian Local Development Plan 2017 and
national planning policy, guidance and advice. 
5. Development cannot be commenced until the tree protection
measures, complying with BS5837 and the Arborcultural Method
Statement hereby approved, for all trees that are to be retained;
have been implemented in full and maintained as such for the
duration of construction. Evidence of the tree protection measures
are in place shall be submitted to the planning authority for prior
written approval. 
6. During construction of the development hereby approved, the
Root Protection Areas of trees to be retained shall be protected in
accordance with the Arboricultural Method Statement with no
plant or machinery to be used in these areas. 
Reason for conditions 5 and 6: To ensure the development
does not result in the loss or damage of a tree which merits
retention. 
7. Development shall not begin until details of a
sustainability/biodiversity scheme for the site including the
provision of a gravel type habitat provision for breeding
oystercatchers, bricks and boxes for bats and swifts throughout
the development and the use of hedgehog friendly fencing has
been submitted to and approved in writing by the planning
authority. Development shall thereafter be carried out in
Page 19 of 64

Page 20

accordance with the approved details, or such alternatives as may
be approved in writing with the planning authority. 
Reason: To ensure the development accords with the
requirements of policy DEV5 of the Proposed Midlothian Local
Development Plan 2017. 
8. Development shall not begin until details and, if requested,
samples of materials to be used on external surfaces of the
buildings; hard ground cover surfaces; means of enclosure and
ancillary structures have been submitted to and approved in
writing by the planning authority. Development shall thereafter be
carried out using the approved materials or such alternatives as
may be agreed in writing with the planning authority. 
Reason: To ensure the quality of the development is enhanced
by the use of quality materials to reflect its setting in accordance
with policies DEV2 and DEV6 of the Midlothian Local
Development Plan 2017 and national planning policy, guidance
and advice. 
9.  Construction and formation of the seven-a-side, 3G and MUGA
pitches shall not begin until details of the floodlighting system and
any security lights to be installed within the site have been
submitted to and approved in writing by the planning authority.
The floodlights and security lights shall be designed and installed
such that there is no direct illumination of any neighbouring
sensitive property and the lamp design shall be such that the
actual lamps and inner surface of the reflectors are not visible
from neighbouring houses which have a garden boundary with the
application site. In addition, the lighting shall be designed to
minimise the spillage of light up into the sky. The floodlighting
system shall be fitted with an automatic cut out to ensure that the
system cannot operate after 9pm. Development shall thereafter
be carried out in accordance with the approved details or such
alternatives as may be approved in writing with the planning,
authority. 
10.  The design and installation of all plant, machinery and equipment
shall be such that the combined noise level shall not exceed NR
30 daytime (07:00 to 23:00 hrs) or NR 25 if the noise is tonal and
NR 25 night-time (23:00 to 07:00 hrs) or NR 20 if the noise is
tonal as measured from within any living apartment in any
neighbouring noise-sensitive premises. For the purposes of this
condition the assessment position shall be as identified by BS
7445 in relation to internal noise measurements 
Reason for conditions 9 and 10: To safeguard residential
amenity. 
Page 20 of 64

Page 21

11. The new synthetic pitch and grass pitch as shown on the
proposed Landscape Layout, hereby approved, (MCC-RFL-ZZ-
ZZ-DR-L-000001 Rev. P14.1) shall be designed and constructed
by a recognised SAPCA* registered, specialist pitch contractor.
Details of contractor(s) and pitch specifications (including lighting
specification for synthetic pitch) shall be submitted to, and
approved in writing by, the planning authority prior to the
commencement of formation of the seven a-side, 3G and MUGA
hereby approved. Thereafter the development shall be completed
in accordance with the approved details. 
Reason: To ensure that the replacement pitches are of a quality
that compensates for the loss of the existing playing field area. 
12.  Development shall not begin until an application for approval of
matters specified in conditions for a Construction Environment
Management Plan (CEMP) has been submitted to and approved
in writing by the planning authority. The CEMP shall include: 
i.  details of construction access routes; 
ii.  signage for construction traffic, pedestrians and other users
of the site; 
iii.  controls on the arrival and departure times for construction
vehicles, delivery vehicles and for site workers (to avoid
school arrival/departure times); 
iv.  details of piling methods (if employed); 
v.  details of any earthworks; 
vi.  control of emissions strategy; 
vii.  a dust management plan strategy; 
viii.  waste management and disposal of material strategy; 
ix.  a community liaison representative will be identified to deal
with the provision of information on the development to the
local community and to deal with any complaints regarding
construction on the site; 
x.  prevention of mud/debris being deposited on the public
highway; 
xi.  material and hazardous material storage and removal; and 
xii.  controls on construction, engineering or any other
operations or the delivery of plant, machinery and materials
(to take place between 0700 to 1900hrs Monday to Friday
and 0800 to 1300hrs on Saturdays). 
Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be approved in
writing with the planning authority. 
Reason: In order to control the construction activity on the site,
ensure environmental impact during the construction period is
acceptable and to ensure appropriate mitigation is in place. 
Page 21 of 64

Page 22

Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager
Date: 14 March 2025
Application No:    25/00079/DPP
Applicant:  Midlothian Council 
Agent:         Philip Zoechbauer, JMArchitects
Validation Date:  10.02.2025
Contact Person:  Whitney Lindsay, Planning Officer
Email:   Whitney.Lindsay@midlothian.gov.uk
Background Papers: 23/00599/DPP and 23/00245/PAC
Attached Plans: Location plan, site plan and elevations plan
Page 22 of 64

Page 23

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2025)
Demolition of existing school and erection of
community campus comprising of primary school and
nursery and associated works
Former Mayfield Primary School, Stone Avenue,
Mayfield, EH22 5PB
File No. 25/00079/DPP
Scale 1:2500Page 23 of 64

Page 24

Page 24 of 64

Page 25

Page 25 of 64

Page 26

Planning Committee
Monday 24 March 2025
Item No. 5.2
APPLICATION FOR PLANNING PERMISSION 24/00415/DPP FOR
ERECTION OF HIGH SCHOOL, ASN FACILITY, COMMUNITY FACILITIES,
SWIMMING POOL AND VETERINARY CLINIC; FORMATION OF SPORTS
PITCHES, CAR PARKING, ACCESS ROADS AND SUDS; AND
ASSOCIATED WORKS AT LAND EAST AND WEST OF SEAFIELD MOOR
ROAD, BILSTON  
Report by Chief Officer Place
1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1 The application is in detail for the erection of a high school, ASN
(additional support needs) facility, community facilities,
swimming pool and veterinary clinic; formation of sports pitches,
car parking, access roads and sustainable urban drainage system
(SUDS); and associated works at land to the east and west of
Seafield Moor Road, Bilston.    
1.2 There has been one representation and consultation responses
from Edinburgh Airport Limited, Scotia Gas Networks (SGN),
Scottish Environment Protection Agency (SEPA), Scottish Water,
sportscotland, Scottish Power Energy Networks, Transport
Scotland, the Council’s Archaeology Advisor (ELCAS) the
Council’s Ecological Advisor (TWIC), the Council’s Land and
Countryside Manager, the Council’s Senior Manager
Neighbourhood Services (Roads), the Council’s Senior Manager
Protective Services (Environmental Health), Damhead and District
Community Council and Roslin and Bilston Community Council.  
1.3 The relevant development plan policies are policies 1, 2, 3, 4, 5, 6,
7, 12, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23 and 27 of the National
Planning Framework 4 (NPF4) and policies STRAT1, STRAT3,
STRAT5, DEV1, DEV2, DEV5, DEV6, DEV7, DEV8, DEV9, DEV10,
ECON2, TRAN1, TRAN2, TRAN5, ENV7, ENV9, ENV10, ENV11,
ENV15, ENV17, ENV18, ENV25, NRG6, IMP1, IMP2 and IMP3 of the
Midlothian Local Development Plan 2017 (MLDP).  
1.4 The recommendation is to grant planning permission subject to
conditions.
Page 26 of 64

Page 27

2 LOCATION AND SITE DESCRIPTION 
2.1 The site is situated to the west of Bilston on either side of Seafield
Moor Road.  It comprises two agricultural fields and the trees and
hedgerows that surround the fields.  The western field measures 8
hectares and is immediately adjacent to the Midlothian Innovation
Centre.  It is identified in the Midlothian Local Development Plan 2017
as forming part of the Midlothian Science Zone. 
2.2 The western plot is level and is used as a grazing field.  It is bounded
to the west by Midlothian Innovation Centre and woodland at the edge
of the Easter Bush campus; to the north by Bush Farm Loan, beyond
which is a solar farm owned by the University of Edinburgh; to the east
by Seafield Moor Road; and to the south by the banks of a tributary of
the Bilston Burn. 
2.3 The eastern plot measures 3.9 hectares and forms part of a larger field
of 6.7 hectares.  It is situated at the edge of Bilston and forms part of
the built-up area of Bilston.  The field is part of the allocated housing
site h55.  The housing site comprises land on both sides of the Bilston
Burn tributary.  The land to the south of the tributary has been built out
with 190 residential units. 
2.4 The east field is level and is used as an arable field.  It is bounded to
the west by Seafield Moor Road; to the north by the remainder of the
field, beyond which is the field boundary with Seafield Road; to the east
by woodland, beyond which is Bilston Primary School; and to the south
by the banks of a tributary of the Bilston Burn. 
2.5 The site is within Roslin and Biston Community Council area.  The site
abuts Damhead and District Community Council area to the north, and
Penicuik and District Community Council area to the west. 
3 PROPOSAL 
3.1  The proposed development comprises three buildings: a secondary
school with sports facilities, including a swimming pool; an ASN
building; and a veterinary clinic.  The secondary school building will be
used to provide community facilities outwith school hours. 
3.2 The secondary school building will have capacity for 1600 pupils and
will be situated in the centre of the western field.  It will have a footprint
of 8,685sqm and a canted L-shaped footprint.  The main three storey
teaching block will be orientated along an east-west axis. A three-
storey arrival block, facing towards Seafield Moor Road, and two storey
sports block will be attached to the east end of the teaching block and
project in a southeasterly direction.  A two-storey swimming pool block
will be attached to the rear of the sports block.  The walls of the main
building will be clad in brick and profiled metal cladding. The building
Page 27 of 64

Page 28

will have a very shallow pitched roof behind parapet walls, except for
the swimming pool which will have a mono-pitch roof. 
3.3 The ASN building will be situated to the west of the swimming pool.
The building will be single storey with a shallow pitched roof sloping
down from a core area with a very shallow pitched roof behind parapet
walls.  The walls will be clad with brick and standing seam metal
cladding.  The pitched roof will be clad with matching standing seam
metal cladding. 
3.4 The veterinary clinic will be situated at the northern edge of the western
field. The clinic will provide a First Opinion Practice (FOP) for the Dick
Vet General Practice.  The building will include dedicated entrance,
waiting and consultation areas for cats and dogs.  The building will be
single storey with a green roof and large mono-pitch rooflights.  The
walls will be clad with brick with a metal cladding fascia band. The
rooflights will be metal clad.  The principal elevation of the building will
face onto Bush Farm Road. 
3.5 The western plot will have two vehicular access points.  A northern
entrance from Bush Farm Road will provide access to a car park for the
school at the northwest corner of the plot and a car park for the FOP,
situated to the west of the FOP building.  A southern entrance from
Seafield Moor Road will provide access to the school’s coach drop-off
area, a further car park and a car park/drop-off area for the ASN.  An
internal circulation road will pass to the east and north of the main
school building. 
3.6 The school will have 213 standard car parking spaces, 12 accessible
bays, 8 coach parking bays and a pickup/drop off layby.  Electric
vehicle charging will be provided at 29 of the standard bays and 3 of
the accessible bays.  The ASN will have 9 accessible parking spaces,
5 mini-bus spaces and a pickup/drop off layby.  The FOP will have 42
parking spaces including 3 accessible spaces. 
3.7 The school will be provided with a landscaped courtyard to the rear of
the arrival block.  The ASN will have its own dedicated garden to the
west and south of the ASN building.  A 3G MUGA pitch will be situated
in the southwest corner of the western field, to the south of the ASN
building.  A grass football pitch and two grass rugby pitches will be
provided on the eastern field.  The main pedestrian entrance to the
grass sports pitches will be from Seafield Moor Road.  The existing
woodland along the eastern (Seafield Moor Road) edge of the western
field will be retained, apart from felling necessary to create the
southern vehicular access. 
3.8 The application is accompanied by the following supporting statements:
(Unless otherwise stated the final date of submission for information
relating to the supporting statements was the date of registration of the
application, 25 June 2024.)
Page 28 of 64

Page 29

• Arboricultural Impact Assessment (Final submission 23 July
2024)
• Archaeological Written Scheme of Investigation (Final
submission 25 September 2024)
• Design and Access Statement
• Energy and Carbon Emissions Strategy
• Flood Risk Assessment (Final submission 10 December 2024,
final correspondence 13 March 2025)
• Invasive Non-Native Species Survey
• Landscape Maintenance Schedule
• Landscape Strategy Report
• Landscape and Visual Appraisal
• Outline Soils Management Plan (Final submission 23 July 2024)
• Pre-Application Consultation Report
• Planning Statement
• Preliminary Ecological Appraisal (Final submission 23
December 2024)
• Replies to various consultation responses (Final submission 18
November 2024)
• Response to representation (Final submission 16 August 2024)
• Site Investigation Report including Coal Mining Risk
Assessment
• Soils Resource Survey (Final submission 23 July 2024)
• Surface Water Management Plan (Final submission 23 July
2024)
• Town Centre First Assessment
• Transport Assessment (Final submission 31 January 2025, final
correspondence 12 March 2025)
• Tree Survey Report (Final submission 23 July 2024)
• Woodland Management Plan 
4 BACKGROUND 
Application Site 
4.1 Prior to the submission of the current application the site was the
subject of two separate Proposal of Application Notices. The first notice
(reference 22/00581/PAC) was submitted in July 2022 and reported to
Committee at it meeting of 31 August 2022.  The second notice
(reference 24/00076/PAC) was submitted in January 2024 and
reported to Committee at its meeting of 12 March 2024. 
4.2 As part of the assessment of the current application the planning
authority issued a screening opinion for the current proposals on 15
July 2024.  The screening opinion confirmed that an Environmental
Impact Assessment (EIA) was not required. 
Page 29 of 64

Page 30

Eastern plot 
4.3 As is noted above, at paragraph 2.3, the eastern plot forms part of an
allocated housing site, h55.  The site was allocated in the 2008
Midlothian Local Plan with an indicative capacity of 150 units.  The
allocated site has been the subject of the following applications: 
• 12/00376/PAC - Proposal of application notice for residential
development and care home with associated landscaping, car
parking and access (relates to land to the north and south of the
Bilston Burn tributary). Approved
• 12/00814/PPP - Application for planning permission in principle
for residential development with associated car parking and
access (relates to land to the north and south of the Bilston Burn
tributary). Consent with conditions
• 17/00428/MSC - Erection of 308 dwellinghouses and 42 flatted
dwellings; formation of access roads; car parking; SUDS
features and associated works (approval of matters specified in
conditions 2, 3, 4, 5, 6, 7, 8 and 10 of planning permission
12/00814/PPP) (relates to land to the north and south of the
Bilston Burn tributary). Pending consideration (but needs to be
withdrawn)
• 19/00321/MSC - Residential development and associated car
parking and access SUDs features and associated works
(approval of matters specified in conditions 2, 3 (i, ii,iii, iv, v, vi,
vii, viii, ix, xi, xii), 4, 5, 6, 7, 9 and 10 of planning permission
12/00814/PPP) (relates only to the land south of the Bilston
Burn tributary). Consent with conditions 
• 19/00638/MSC - Residential development (approval of matters
specified in condition 3x of planning permission 12/00814/PPP
relating to play equipment) (relates only to the land south of the
Bilston Burn tributary). Consented 
Western plot 
4.4 As is noted above, at paragraph 2.1, the western plot is identified in the
Midlothian Local Development Plan 2017 as forming part of the
Midlothian Science Zone. 
4.5 Midlothian Science Zone is a group of related and neighbouring
developments that together comprise Europe’s largest concentration of
animal-science related expertise. The sites that form Midlothian
Science Zone are as follows: 
• Easter Bush Campus – The University of Edinburgh’s Easter
Bush Campus is home to the Royal (Dick) School of Veterinary
Studies; the Roslin Institute; the Roslin Innovation Centre; and
various other buildings associated with animal medicine, care
and research.
Page 30 of 64

Page 31

• Edinburgh Technopole – A science park based at Bush Estate.
Edinburgh Technopole comprises Bush House and five modern
purpose built office/laboratory buildings.
• Pentland Science Park – Established by the Moredun Research
Institute, Pentland Science Park is home to Moredun and a
variety of tenants.
• BioCampus – Owned by Scottish Enterprise, BioCampus is a
bio-manufacturing science park. 
4.6 In addition to the sites that form Midlothian Science Zone the wider
Bush area also includes the University of Edinburgh’s Advanced
Computer Facility, and land and buildings owned and occupied by
SRUC; the Centre for Ecology and Hydrology; SELECT; and the
Forestry Commission. There is also a small business park, Midlothian
Innovation Centre, located to the east of the Easter Bush Campus. 
4.7 Midlothian Innovation Centre is a business park situated immediately to
the west of the western plot. The site was originally built in the 1950’s
as a Scottish Office agricultural research station. The research function
ceased in the 1990s and the site was sold.  A Certificate of Lawfulness
in 1994 confirmed that the lawful use of the site was for Class 4
(Business) purposes. 
4.8 The site comprises a variety of buildings dating from the 1950s up to
the late 2000s. The largest buildings are the Midlothian Innovation
Centre Building (formerly Pentlandfield House), which is a 2 storey
1950s traditionally styled office building with modern 1970s extensions;
Centre House, which is a 4-storey office building in a converted 1950s
seed store; and Stobo House, which is a modern 3 storey office
building built in the late 2000s. In addition to these buildings there are
various single storey workshop buildings of varying ages and some
open contractors’ yards. 
4.9 Due to the floorspace and the site area the application constitutes a
Major Development, as defined in the Town and Country Planning
(Hierarchy of Developments) (Scotland) Regulations 2009, and
therefore it requires to be determined by the Committee. 
5 CONSULTATIONS 
5.1 The Aerodrome Operator (Edinburgh Airport Limited) does not
object to the application. The proposed development has been fully
examined from an aerodrome safeguarding perspective and does not
conflict with safeguarding criteria. 
5.2 Scotia Gas Networks (SGN) does not object to the application The
plans provided with the consultation response show no SGN assets
within the application site. 
Page 31 of 64

Page 32

5.3 The Scottish Environment Protection Agency (SEPA) initially
provided a holding objection on the grounds of insufficient information
in relation to flood risk. Following submission of a revised Flood Risk
Assessment the objection was withdrawn, subject to any decision
notice including a condition specifying no raising of ground levels within
the parts of the site that are identified, in the Flood Risk Assessment,
as forming part of a flood risk area. 
5.4 Scottish Water does not object to the application.  The water supply
will be fed from Glencorse Water Treatment Works.  The foul water
drainage will be dealt with by the Edinburgh PFI Waste Water
Treatment Works.  Both have sufficient capacity at present; however, it
is not possible to reserve capacity for future developments. 
5.5 For reasons of sustainability and to protect Scottish Water customers
from potential future sewer flooding, Scottish Water will not accept any
surface water connections into the combined sewer system. There may
be limited exceptional circumstances where we would allow such a
connection for brownfield sites only, however this will require significant
justification from the customer taking account of various factors
including legal, physical and technical challenges. 
5.6 In order to avoid costs and delays where a surface water discharge to
the combined sewer system is anticipated, the developer should
contact Scottish Water at the earliest opportunity with strong evidence
to support the intended drainage plan prior to making a connection
request. The evidence will be assessed in a robust manner and any
decision will reflect the best option from environmental and customer
perspectives. 
5.7 sportscotland does not object to the application. The response
provides comments on the proposed sports pitch provision and
recommends conditions to be attached to any grant of planning
permission. 
5.8 SP Energy Networks does not object to the application.  The plans
provided with the consultation response show that there are high
voltage underground cables within the site, close to the northern
boundary with Bush Farm Road. 
5.9 Transport Scotland does not object to the application subject to
conditions on any grant of planning permission to secure the delivery of
a roundabout at the A702/Bush Loan junction prior to the opening of
the school; a Travel Plan setting out measures to reduce dependency
on private car travel; and measures to control construction traffic. 
5.10 The Council’s Archaeology Advisor does not object to the application
and has approved the Written Scheme of Investigation for an
Archaeological Trial Trench Evaluation. 
Page 32 of 64

Page 33

5.11 The Council’s Ecological Advisor (The Wildlife information Centre -
TWIC) does not object to the application and has confirmed that the
Preliminary Ecological Appraisal is acceptable subject to pre-
construction surveys being undertaken. 
5.12 The Council’s Land and Countryside Manager does not object to the
application and has confirmed that there are no rights of way or other
well used paths running through the site of the proposed school. 
5.13 The Council’s Senior Manager Neighbourhood Services (Flood
Risk and Transportation) does not object to the application.  The
consultation response includes comments on the detail of the internal
site layout, active travel provision, improvements to traffic signals at
junctions on the A703 and electric vehicle charging – these matters can
be covered by conditions. 
5.14 The Council’s Senior Manager Protective Services (Environmental
Health) does not object to the application.  The response notes that the
location of the MUGA pitch and its associated acoustic fence will
ensure that impact on sensitive receptors is suitably mitigated. The Site
Investigation Report has been subject to three rounds of external peer
review, further submissions will be required to address matters
associated with potential ground contamination. 
5.15 Damhead and District Community Council supports the proposal in
principle but is concerned that the following matters relating to flood
risk have not been addressed: 
• All risks of flooding are understood and addressed. The
Community Council is concerned that the model used
underestimates the frequency of flooding events.
• The development remains safe and operational during flooding.
In particular, concerns relate to access to the site and flooding of
surrounding roads. 
• Future adaptations can be made to accommodate the effects of
climate change. Footage is attached (not to this report) of local
flooding that is currently happening on a regular basis, and
therefore is only likely to be exacerbated as a result of the
proposed development plus anticipated climate change.  There
is no evidence that this has been considered. 
5.16 The community council also has concerns about: 
• Road safety and the difficulty of accessing the site via active
travel.
• Parking provision, with particular reference to a lack of spaces
for pickup and drop-off.
• Litter.
• Loss of biodiversity. 
Page 33 of 64

Page 34

5.17 Roslin and Bilston Community Council supports the principle of a
new high school for pupils resident in Bilston, Roslin and the
surrounding area, but objects to the current proposal.  The grounds for
objection are as follows: 
• Accessibility for pupils – The location of the school is on the
extreme southwestern edge of the proposed catchment area.
The distance from Loanhead and the lack of active travel routes
will discourage use of active travel.
• Lack of details of active travel routes – Details of active travel
routes and funding for them should be assessed as part of the
planning application.
• Conflict with A701 Relief Road – Construction of the A701 Relief
Road will increase traffic on the A703 and this will have a
significant impact on the safety of the main access to the school.
• Traffic calming – Drawings showing a detailed design for the
traffic calming have not been submitted. There is thus no means
of assessing the effectiveness of any traffic calming. The
addition of traffic calming measures to the A703 will reduce time
savings that are anticipated for the A701 Relief Road.
• Transport Assessment inadequate – The Assessment does not
give adequate consideration to the impact on the A703 of the
proposed A701 Relief Road; or to the impact of trip generation
from pupil pickup/drop-off.  The Relief Road and its A703
southern continuation will be part of the strategic transport
network, and the proposal should be assessed on those
grounds. The Assessment refers to active travel improvements
that will be delivered by the A701 Relief Road project but
excludes the Relief Road from trip modelling, this is an
inconsistent approach.
• Site search - The location of the proposed school is
unsatisfactory in a number of ways, not least having a campus
that is split by a main road, a road that is due to become even
busier in a few years’ time. With so much public money at stake,
the need for a thorough site search (not just the very limited
town centres first exercise) is irrefutable. Until there has been an
open, professional site search with opportunity for public
participation, including participation in drawing up the terms of
reference and in the assessment process, planning permission
for the present proposal must not be granted.
• Development plan zonings – The proposal does not comply with
the land use allocations in the development plan.
• Provision for outdoor sports - The proposed outdoor sports
provision would be to a lower standard than that at the existing
Beeslack School. It would not accord with good practice
recommendations. The proposed school would not have tennis
courts. It would not have space for athletics. Its provision for
outdoor activities is inadequate.
• Flood risk – The proposed access from Seafield Moor Road will
be within a floor risk area.  It would be better to locate the
Page 34 of 64

Page 35

proposed school on a site that is not in danger of having its main
access flooded.
• Midlothian Science Zone – A school anywhere within the
catchment area would be accessible to Midlothian Science
Zone. The benefits of physical proximity have been diminished
by increased use of digital technology.
• Biodiversity - any consent for the proposed development must
include a condition requiring adherence to the Midlothian Local
Biodiversity Action Plan.
• Conclusion - A new school is needed and would be welcome.
The proposals in their current form do not demonstrate a
development that would be satisfactory. 
5.18 Loanhead and District Community Council, and Penicuik and District
Community Council were both consulted on the application and offered
no comments on the proposal. 
6 REPRESENTATIONS 
6.1 The application has received one objection. The grounds for objection
are as follows: 
• The design of the school does not meet the requirements set out
in The School Premises (General Requirements and Standards)
(Scotland) Regulations 1967 as amended. In Section 15 it
states: "Provided that in every school is not designed exclusively
for girls half the accommodation shall be for boys and not more
that one third of the appliances for boys shall be water closets
and the remainder shall be urinals, " The response from
Architype doesn't explain why the school design doesn't contain
any urinals and as such, doesn't meet the requirements. It is my
view that the requirements infer that the half of the
accommodation for boys should be distinct from the half of
accommodation for girls. Furthermore, if urinals are provided
only for the use of boys, failure to provide any separate
accommodation only for the use of girls would be discriminatory
on the protected characteristics of sex as it would treat girls less
favourably than boys. 
• The Building Standards Technical Handbook 2002 in section
3.12.1 states "Separate male and female sanitary
accommodation is usually provided". It is noted that it also
states, "Unisex sanitary accommodation may be provided where
each sanitary facility, or a WC and wash hand basin, is located
within a separate space, for use by only one person at a time,
with a door that can be secured from within for privacy." It
should be noted that this is general guidance for all nondomestic
buildings. In my view, it does not override the 1967 regulations
for schools except for accessible sanitary facilities. The
response from Architype assumes that the Building Standards
Page 35 of 64

Page 36

handbook overrides the 1967 regulations. Further explanation
from them is required from them to explain their reasoning. 
• Equality and Human Rights Commission Technical Guidance for
Schools in Scotland 2014 (updated 2023). The guidance states
that "Sex segregation is permitted in certain situations, such as
where it is necessary and appropriate to preserve privacy and
decency. The law in Scotland requires schools to provide toilet
facilities for boys and for girls. Toilet cubicles are required to be
partitioned and to have lockable doors." The sentence
mandating the provision of "toilet facilities for boys and for girls"
needs to be read taking cognisance of the context of the whole
paragraph which is sex segregation. In my view, the inference is
that it mandates separate accommodation for boys and girls. As
this is open to interpretation, I would appreciate it if the EHRC
were added as a consultee to the planning application to provide
clarification. The response from Architype ignores the context of
the sentence. 
• Ultimately is it not Architype but the Council who will have to
determine if the building meets the regulations. As part of this
determination, in addition to addressing the above objections, I
would expect the council to provide the following: 
A) A detailed independent assessment from the council
explaining how the building meets the 1967 regulations,
building standards and the EHRC technical guidance. 
B) An equality impact assessment of the proposed WC
arrangements in the proposed high school on girls as part of
their duties in relation to discrimination on the grounds of
sex. 
C) A management strategy to explain how the council will
ensure the "spaces are suitable for all genders to use"
especially in regard to cleaning and supervision provided. 
7 PLANNING POLICY 
7.1 The development plan for the area is comprised of National Planning
Framework 4 (2023) and the Midlothian Local Development Plan 2017. 
7.2 The following policies are relevant to the proposal: 
National Planning Framework 4 (NPF4) 
7.3 Policy 1 Tackling the climate and nature crisis; sets out to
encourage, promote and facilitate development that addresses the
global climate emergency and nature crisis. 
Page 36 of 64

Page 37

7.4 Policy 2 Climate mitigation and adaptation; sets out to encourage,
promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change. 
7.5 Policy 3 Biodiversity; sets out to protect biodiversity, reverse
biodiversity loss, deliver positive effects from development and
strengthen nature networks. 
7.6 Policy 4 Natural Places; sets out to protect, restore and enhance
natural assets making best use of nature-based solutions. 
7.7 Policy 5 Soils; sets out to protect carbon-rich soils, restore peatlands
and minimise disturbance to soils from development. The policy also
sets out acceptable scenarios for development on prime agricultural
land. 
7.8 Policy 6 Forestry, woodland and trees; sets out to protect and
expand forests, woodland and trees. 
7.9 Policy 7 Historic assets and places; sets out to protect and enhance
historic environment assets and places, and to enable positive change
as a catalyst for the regeneration of places. 
7.10 Policy 12 Zero Waste; sets out to encourage, promote and facilitate
development that is consistent with the waste hierarchy. 
7.11 Policy 13 Sustainable transport; sets out to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to travel
unsustainably. 
7.12 Policy 14 Design, quality and place; sets out to encourage, promote
and facilitate well designed development that makes successful places
by taking a design-led approach and applying the Place Principle. 
7.13 Policy 15 Local Living and 20 minute neighbourhoods; sets out to
encourage, promote and facilitate the application of the Place Principle
and create connected and compact neighbourhoods where people can
meet the majority of their daily needs within a reasonable distance of
their home, preferably by walking, wheeling or cycling or using
sustainable transport options. 
7.14 Policy 16 Quality homes; sets out to encourage, promote and facilitate
the delivery of more high quality, affordable and sustainable homes, in
the right locations, providing choice across tenures that meet the
diverse housing needs of people and communities across Scotland. 
7.15 Policy 18 Infrastructure first; sets out to encourage, promote and
facilitate an infrastructure first approach to land use planning, which
puts infrastructure considerations at the heart of placemaking. 
Page 37 of 64

Page 38

7.16 Policy 19 Heating and Cooling sets out to encourage, promote and
facilitate development that supports decarbonised solutions to heat and
cooling demand and ensure adaptation to more extreme temperatures. 
7.17 Policy 20 Blue and green infrastructure; sets out to protect and
enhance blue and green infrastructure and their networks. 
7.18 Policy 21 Play, recreation and sport; sets out to encourage, promote
and facilitate spaces and opportunities for play, recreation and sport. 
7.19 Policy 22 Flood risk and water management; sets out to strengthen
resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to
flooding. 
7.20 Policy 23 Health and safety; sets out to protect people and places
from environmental harm, mitigate risks arising from safety hazards
and encourage, promote and facilitate development that improves
health and wellbeing. 
7.21 Policy 27 City, town, local and commercial centres; sets out to
encourage, promote and facilitate development in our city and town
centres, recognising they are a national asset. This will be achieved by
applying the Town Centre First approach to help centres adapt
positively to long-term economic, environmental and societal changes,
and by encouraging town centre living. 
Midlothian Local Development Plan 2017 (MLDP) 
7.22 Policy STRAT1: Committed Development seeks the early
implementation of all committed development sites and related
infrastructure, facilities and affordable housing, including sites in the
established housing land supply. Committed development includes
those sites allocated in previous development plans which are
continued in the MLDP. 
7.23 Policy STRAT3: Strategic Housing Land Allocations states that
strategic land allocations identified in the plan will be supported
provided they accord with all other policies. 
7.24 Policy STRAT5: Strategic Employment Land Allocations supports
development for employment uses on sites identified as strategic
employment land allocations. 
7.25 Policy DEV 1: Community Identity and Coalescence states that
development will be supported where it does not result in the physical
or visual coalescence of neighbouring communities.  Where
coalescence may occur, the development must include mitigation
measures to maintain visual separation and protect community identity.
Such measures, which may include landscaped buffer zones and other
Page 38 of 64

Page 39

community woodland, will be tailored to the particular circumstances of
the location. 
7.26 Policy DEV2: Protecting Amenity within the Built-Up Area states
that development will not be permitted within existing and future built-
up areas where it is likely to detract materially from the existing
character or amenity of the area. 
7.27 Policy DEV5: Sustainability in New Development sets out the
requirements for development with regards to sustainability principles. 
7.28 Policy DEV6: Layout and Design of New Development states that
good design and a high quality of architecture will be required in the
overall layout of development proposals.  This also provides guidance
on design principles for development, materials, access, and passive
energy gain, positioning of buildings, open and private amenity space
provision and parking. 
7.29 Policy DEV7: Landscaping in New Development requires
development proposals to be accompanied by a comprehensive
scheme of landscaping.  The design of the scheme is to be informed by
the results of an appropriately detailed landscape assessment. 
7.30 Policy DEV8: Open Spaces states that the Council will seek to protect
and enhance the open spaces identified on the Proposals Map.
Development will not be permitted in these areas that would: 
A. Result in a permanent loss of the open space; and/or
B. Adversely affect the accessibility of the open space; and/or
C. Diminish the quality, amenity or biodiversity of the open space;
and/or
D. Otherwise undermine the value of the open space as part of the
Midlothian Green Network or the potential for the enhancement
of the open space for this purpose. 
7.31 Policy DEV9: Open Space Standards sets out the necessary open
space for new developments. This policy requires that the Council
assess applications for new development against the open space
standards as set out in Appendix 4 of that plan and seeks an
appropriate solution where there is an identified deficiency in any of the
listed categories (quality, quantity and accessibility).  Supplementary
Guidance on open space standards is to be brought forward during the
lifetime of the plan. 
7.32 Policy DEV10: Outdoor Sports Facilities seeks to protect outdoor
sports facilities from re-development except in certain circumstances:
where the proposed development is ancillary to the principle use of the
site as an outdoor sports facility; the loss is only minor and would not
affecting its overall use; the outdoor sports facility is to be replaced
either by a new facility of comparable or greater benefit for sport or
upgrading of an existing facility on the same site or nearby; or where
Page 39 of 64

Page 40

the sports pitch needs assessment, open space audit and consultation
with sportscotland identify a clear excess of provision to meet the
existing or anticipated demand in the area and the overall quality of
provision in the locality will be maintained. 
7.33 Policy ECON2: The Bush Bioscience Cluster states that the cluster,
of which the application site forms part, will be safeguarded for the
specific purpose of supporting and expanding bioscience research and
development. Development will be supported on committed
development sites, allocated sites and on non-allocated sites within the
Bush Framework Masterplan; subject to detailed design, scale and
landscape impact being acceptable and the necessary local and
strategic infrastructure requirements of the MLDP being met. 
7.34 Policy TRAN1: Sustainable Travel aims to encourage sustainable
modes of travel. 
7.35 Policy TRAN2: Transport Network Interventions highlights the
various transport interventions required across the Council area,
including the A701 Relief Road and A702 Link, and A702/Bush Loan
junction improvements. 
7.36 Policy TRAN5: Electric Vehicle Charging seeks to support and
promote the development of a network of electric vehicle charging
stations by requiring provision to be considered as an integral part of
any new development or redevelopment proposals. 
7.37 Policy ENV7: Landscape Character states that development will not
be permitted where it significantly and adversely affects local
landscape character.  Where development is acceptable, it should
respect such character and be compatible in terms of scale, siting and
design.  New development will normally be required to incorporate
proposals to maintain the diversity and distinctiveness of the local
landscapes and to enhance landscape characteristics where they have
been weakened. 
7.38 Policy ENV9: Flooding presumes against development which would
be at unacceptable risk of flooding or would increase the risk of
flooding elsewhere.  It states that Flood Risk Assessments will be
required for most forms of development in areas of medium to high risk,
but may also be required at other locations depending on the
circumstances of the proposed development.  Furthermore it states that
sustainable urban drainage systems will be required for most forms of
development, so that surface water run-off rates are not greater than in
the site’s pre-developed condition, and to avoid any deterioration of
water quality. 
7.39 Policy ENV10: Water Environment requires that new development
pass surface water through a sustainable urban drainage system
(SUDS) to mitigate against local flooding and to enhance biodiversity
and the environment.
Page 40 of 64

Page 41

7.40 Policy ENV11: Woodland, Trees and Hedges states that development
will not be permitted where it could lead directly or indirectly to the loss
of, or damage to, woodland, groups of trees (including trees covered by
a Tree Preservation Order, areas defined as ancient or semi-natural
woodland, veteran trees or areas forming part of any designated
landscape) and hedges which have a particular amenity, nature
conservation, biodiversity, recreation, landscape, shelter, cultural, or
historical value or are of other importance. 
7.41 Policy ENV15: Species and Habitat Protection and Enhancement
presumes against development that would affect a species protected
by European or UK law. 
7.42 Policy ENV17: Air Quality states that the Council may require further
assessments to identify air quality impacts where considered requisite.  
It will refuse planning permission, or seek effective mitigation, where
development proposals cause unacceptable air quality or dust impacts. 
7.43 Policy ENV18: Noise requires that where new noise sensitive uses are
proposed in the locality of existing noisy uses, the Council will seek to
ensure that the function of established operations is not adversely
affected. 
7.44 Policy ENV25: Site Assessment, Evaluation and Recording requires
that where development could affect an identified site of archaeological
importance, the applicant will be required to provide an assessment of
the archaeological value of the site and of the likely impact of the
proposal on the archaeological resource. 
7.45 Policy NRG6: Community Heating requires that, wherever
reasonable, community heating should be supported in connection with
buildings and operations requiring heat. 
7.46 Policy IMP1: New Development ensures that appropriate provision is
made for a need which arises from new development.  Of relevance in
this case are education provision, transport infrastructure; contributions
towards making good facility deficiencies; affordable housing;
landscaping; public transport connections, including bus stops and
shelters; parking in accordance with approved standards; cycling
access and facilities; pedestrian access; acceptable alternative access
routes, access for people with mobility issues; traffic and environmental
management issues; protection/management/compensation for natural
and conservation interests affected; archaeological provision and
‘percent for art’ provision. 
7.47 Policy IMP2: Essential Infrastructure Required to Enable New
Development to Take Place states that new development will not take
place until provision has been made for essential infrastructure and
environmental and community facility related to the scale and impact of
the proposal.  Planning conditions will be applied and where
Page 41 of 64

Page 42

appropriate, developer contributions and other legal agreements will be
used to secure the appropriate developer funding and ensure the
proper phasing of development. 
7.48 Policy IMP3: Water and Drainage require sustainable urban drainage
systems (SUDS) to be incorporated into new development. 
8 PLANNING ISSUES 
8.1 The main planning issue to be considered in determining this
application is whether the proposal complies with development plan
policies unless material planning considerations indicate otherwise.
The representations and consultation responses received are material
considerations. 
Principle of development 
8.2 The two fields that make up the application site are both sited on land
that is allocated for development in the MLDP.  The land to the east of
Seafield Moor Road forms part of an allocated housing site (MLDP
reference h55) and is situated within the built-up area of Bilston.  The
land to the west of Seafield Moor Road is within the Midlothian Science
Zone where there is long term support for bioscience research and
development.  The western field is not identified in the MLDP as being
within the built-up area of Bilston, however it is also not identified as
being either countryside or green belt land. 
8.3 There is a presumption in favour of appropriate development on the
application site.  Whilst the proposed development does not wholly fall
within the stated allocations (housing and bioscience), the vet clinic use
can be considered to be an appropriate use for the Midlothian Science
Zone particularly as the facility will be operated by the University of
Edinburgh in connection with its existing vet school at Easter Bush. 
The siting of school campuses within or adjacent to residential areas is
a common practice throughout Scotland and the UK, and the uses are
readily compatible.  The siting of the main schools campus on land at
the edge of the Midlothian Science Zone will not have a detrimental
impact on the operation of the Science Zone and offers the potential for
education links that could aid the furtherance of the science zone.  The
combination of direct policy support and material considerations
provide support for the proposed uses at the proposed locations.  The
principle of development can be considered acceptable. 
Town Centre First Assessment and site selection 
8.4 Policy 27 City, town, local and commercial centres of NPF4 seeks to
encourage, promote and facilitate development in Scotland’s city and
town centres and recognises such centres as a national asset.  This
will be achieved by applying the Town Centre First approach to help
centres adapt positively to long-term economic, environmental and
societal changes, and by encouraging town centre living.  The policy
Page 42 of 64

Page 43

states that proposals which will generate significant footfall will not be
supported outwith existing centres unless a Town Centre First
Assessment (TCFA) demonstrates that 
• all centre and edge of centre options have been sequentially
assessed and discounted as unsuitable or unavailable; 
• the scale of development cannot reasonably be altered or
reduced in scale to allow it to be accommodated in a centre; and 
• the impacts on existing centres have been thoroughly assessed
and there will be no significant adverse effect on the vitality and
viability of the centres 
8.5 The application is supported by a TCFA which includes details of the
legislative and policy foundation of the town centre first principle; the
need for a new school; the characteristics of the development; a
sequential assessment of possible sites; and the development’s
relationship with existing town and local centres in Midlothian. 
8.6 To accommodate a high school with capacity for 1600 pupils and 229
staff, an ASN facility for 30 pupils, sports pitches, and bus, car and
cycle parking a site of 11.2 hectares is required.  Initial site assessment
conducted by Midlothian Council in June 2021 identified four available
potential sites which were the existing Beeslack High School, South
East Gowkley Moss, Loanhead (Ramsay Colliery) Bing and Easter
Bush Campus.  Of these sites, the only one that is in the proposed
catchment area for the school and in the proximity of an identified town
or local centre is Loanhead Bing. 
8.7 The Loanhead Bing site is identified as a protected open space via
policy DEV8 (Open Spaces) of the MLDP.  Development of the site
would be contrary to policy DEV8.  The site was formerly a colliery
bing, and development would require significant site investigation,
remediation and ground stabilisation works that would prevent the site
being developed within the necessary timescales required to meet the
required schedule for the opening of the school.  The Loanhead Bing is
not considered a suitable site for the proposed development. The
TFCA has not identified any suitable or available centre or edge of
centre sites. 
8.8 The TCFA concludes that the proposed development could have a
positive impact on local shops and facilities within Bilston, which would
be within 10 minutes walk of the campus.  Roslin local centre is
approximately 1 mile from the application site and consequently any
benefit from the proximity to the school campus is likely to be marginal. 
8.9 The closest town centre to the application site is Loanhead, which is a
44-minute walk or 10 minute cycle or bus journey from the site.  Given
the nature of the proposed use, it will not draw trade or visitors from
Page 43 of 64

Page 44

Loanhead town centre.  Due to the distance between the site and the
other town centres within Midlothian it will not have a significant
adverse effect on their vitality and viability. 
8.10 When assessing a planning application, the planning authority must
assess whether the proposal is acceptable at that location.  It is not
within the planning authority’s remit to identify alternative sites for a
proposal as part of the assessment of a planning application. 
Flood risk 
8.11 The SEPA flood maps identify parts of the site as being at risk of river
flooding and surface water flooding.  The application is supported by a
Flood Risk Assessment which includes flood modelling for a 1 in 200
year plus climate change overlaid onto the proposed site layout.  All
buildings on the site are outwith the identified flood risk area.  The
playing fields and areas along the eastern side of the west plot,
including the access from the A703 and campus circulation space,
would be within the identified flood risk area.  SEPA has assessed the
Flood Risk Assessment and has no objection to the proposal subject to
any decision notice including the following condition: 
The ground level within the flood risk area, as shown tinted blue on
Figure 13 of the approved Flood Risk Assessment Version 2.0, must
not be raised above the ground levels shown on the approved
Topographical Survey (Existing) Sheets 1 to 11 (inclusive). 
8.12 The applicant’s agent has confirmed that the project’s engineers have
reviewed the proposed levels across the site and accept that this
condition needs to be attached to any permission.  The levels in the
area of the flood zone can be adjusted to align with the existing levels
via the discharge of conditions. 
Transportation matters 
8.13 The application is supported by a Transport Assessment (TA) which
has assessed the impact on the local road network of the high school
(1600 pupils) and ASN facility (30 pupils), with a combined total of 214
staff, and the FOP clinic with 20 staff and 14 students.  The TA
calculates that 35% of high school pupils will walk to school (equating
to 560 trips), 49% will arrive by bus (784 trips) and 10% will arrive by
car (107 trips assuming some car sharing).  The remaining journeys will
be via cycle (16 trips), scoot/skate (16 trips), park & stride (48 trips) and
taxi (16 trips).  These figures have been arrived at via the use of data
from Sustrans’ “Hands up Scotland” pupil survey with adjustments to
account for the location and catchment area characteristics. 
8.14 It is anticipated that 85% of school staff will arrive by car (182 trips).
This figure has been arrived at via postcode analysis of existing staff
and staff surveys. 
Page 44 of 64

Page 45

8.15 It is anticipated that most staff and visitors of the FOP clinic will arrive
by car and that students will not park on site.  The TA calculates trip
generation figures for the FOP of 32 in and 15 out during the AM peak
(07:30-08:30); 30 in and 38 out during school finish (15:00-16:00); and
23 in and 28 out during the PM peak (16:30-17:30). 
8.16 The TA was prepared on the assumption that the existing A702/Bush
Loan junction, which operates over capacity and has been the subject
of longstanding concerns from Transport Scotland, will have been the
subject of junction improvements prior to the opening of the application
site.  The consent (reference 25/00520/DPP) for the improvements (a
3-arm roundabout to the north of the existing junction) was issued on
12 March 2025.  Modelling in the TA indicates that the improved
junction will operate within capacity in all trip generation scenarios for
the application site. Transport Scotland has recommended the
following condition: 
Development shall not be occupied until an approved new 3-arm
roundabout at the intersection of the A702(T) and Bush Loan Road 
has been constructed and completed in accordance with the approved
plans 
8.17 The applicant has confirmed that the schedule for completion of the
roundabout will ensure that this condition will be complied with. 
8.18 The TA predicts trip generation at the A702/A703/Old Pentland Road,
at Hillend, as follows: 
Left turn A702 into
A703
Right turn A703 into
A702
Morning peak 57 44
School finish 64 0
Evening peak 25 21 
8.19 The TA concludes that, overall, these movements are a relatively low
number of additional peak hour vehicle movements that will not have a
material impact on the operation of the junctions. Whilst the junctions
are currently operating over capacity they are currently being upgraded
to signalised junctions. This will improve the operation of the junctions
and provide capacity to accommodate additional vehicle trips
generated by the current application proposal. Transport Scotland
agrees with these conclusions. 
8.20 The junction modelling for the local road network concludes that the
A703 Seafield Moor Road/Seafield Road/Bush Farm Road signalised
junction A701/B7006 roundabout will both operate within capacity
during all modelling scenarios.  The A701/A703 signalised junction is
predicted to operate within capacity during all scenarios, whilst the
junction is nearing capacity in the evening peak this will not coincide
with school hours and consequently the proposal will not impact on the
Page 45 of 64

Page 46

junction during the evening peak.  Both site access junctions are
predicted to operate within capacity. 
8.21 The A701/Nivensknowe Road is predicted to operate over capacity
during the majority of modelled scenarios, however the additional traffic
attributable to the application proposal is minimal and is not expected
to have a material impact on the operation of the junction. 
8.22 The Council’s Roads Services and Active Travel team have started
work on identifying safe routes to schools and necessary improvements
that will be required to deliver them. Finalised details can be secured
via condition on any grant of planning permission. 
Landscaping 
8.23 The majority of the existing woodland at the edges of the fields will be
retained, however trees will be felled to provide the site access from
Seafield Moor Road and its visibility splay. In addition, the hedgerow
along the Bush Farm Road boundary will be removed. The removals
represent 6.4% of the area of existing trees and hedges on the site.
The landscaping scheme for the site will provide a net gain in canopy
cover for both trees and hedgerows. 
Design 
8.24 All three buildings will have a contemporary appearance and a
contemporary palette of materials.  Each building will have an individual
palette of materials and their own dedicated entrances.  The scale and
appearance of the school buildings will reflect contemporary trends in
school design.  All of the buildings will be in keeping with the scale and
character of the Midlothian Science Zone. 
Provision of toilets 
8.25 Section 41B of the Town and Country Planning (Scotland) Act 1997 (as
amended) requires certain specified types of development, including
schools with a floorspace of over 5000sqm, to provide at least one
accessible toilet and changing place facility. The applicant’s agent has
confirmed that such a facility will be provided within the school building
and has confirmed the location of said facility.  Due to the size of the
buildings there is no statutory planning requirement for the ASN and
FOP facilities to provide such facilities. 
8.26 With the exception of the provision of the facilities specified in Section
41B the provision of toilet and changing facilities is outwith the scope of
planning and is dealt with via the building standards process.  Beyond
compliance with building regulations the allocation of toilet facilities to
different sets of pupils is an operational matter for the Education
Authority. 
Page 46 of 64

Page 47

Sports pitch provision 
8.27 The proposal will not directly result in the loss of current sports pitch
provision at the existing Beeslack High School.  Any subsequent
proposals for the redevelopment of the existing Beeslack site will be
assessed via a separate planning application(s) that will be the subject
of statutory consultation with sportscotland.  The consultation response
from sportscotland notes that according to sportscotland guidance a
new school with a capacity of 1600 pupils would be expected to be
provide 2 synthetic pitches and 4 grass pitches. The proposed layout
provides 1 synthetic (3G) pitch and 3 grass pitches.  Due to the size of
the site, it is not possible to provide any further pitches, sportscotland
acknowledges this fact and acknowledges that the proposed
development will provide a similar level of pitch provision to the existing
school. sportscotland has no objection to the proposal. 
Biodiversity 
8.28 The Preliminary Ecological Appraisal (PEA) submitted in support of the
application has identified the habitats within the site and the potential
impact on protected species. Further survey work, immediately prior to
commencement of development, and mitigation measures, if
appropriate, can be secured via condition. The PEA and the Landscape
Strategy include measures to enhance biodiversity, and finalised
details can be secured via condition. Appropriate mitigation and
enhancement measures will ensure that the development will protect,
conserve, restore and enhance biodiversity. 
Notification to Scottish Ministers 
8.29 The Notification Direction attached as an Annex to Scottish
Government Circular 3/2009: Notification of Planning Applications
requires planning authorities to notify Scottish Ministers of
developments where the planning authority is the applicant/developer,
and the proposed development would be significantly contrary to the
development plan for the area.  Whilst the proposal does not comply
with the allocated uses for the site there is support for development on
the site and material considerations that support the proposal.  The
proposed development does not represent a significant departure from
the development plan and therefore does not require notification to the
Scottish Ministers. 
9 RECOMMENDATION 
9.1 That planning permission be granted for the following reason: 
The site is located on two sites allocated for development in the
Midlothian Local Development Plan and will provide a facility that will
enable the Council to meet statutory education requirements and
therefore there is a presumption in favour of an appropriate educational
use development. The proposed detailed scheme of development in
Page 47 of 64

Page 48

terms of its layout, form, design and landscape framework is
acceptable and as such accords with development plan policies. The
presumption for development is not outweighed by any other material
considerations 
Subject to the following conditions: 
1. The development to which this permission relates shall commence
no later than the expiration of three years beginning with the date of
this permission. 
Reason: To accord with the provisions of Section 58 of the Town
and Country Planning (Scotland) Act 1997 (as amended by the
Planning (Scotland) Act 2019). 
2. The development shall not begin until a scheme to deal with any
contamination of the site has been submitted to and approved by
the planning authority.  The scheme shall contain details of the
proposals to deal with any contamination and include: 
i. the nature, extent and types of contamination on the site;
ii. measures to treat or remove contamination to ensure that
the site is fit for the uses hereby approved, and that there is
no risk to the wider environment from contamination
originating within the site;
iii. measures to deal with contamination encountered during
construction work; and
iv. the condition of the site on completion of the specified
decontamination measures. 
3. On completion of any required decontamination/ remediation works,
referred to in Condition 2, and prior to any part of the building being
occupied for its approved use, a validation report shall be submitted
to the planning authority confirming that the works have been
carried out in accordance with the approved scheme. No part of the
building shall be occupied unless or until the planning authority
have approved the required validation. 
Reason for conditions 2 and 3: To ensure that any contamination
on the site is adequately identified and that appropriate
decontamination measures are undertaken to mitigate the identified
risk to site users and construction workers, built development on the
site, landscaped areas, and the wider environment. 
4. Development shall not begin until the applicant has undertaken and
reported upon a programme of archaeological (evaluation) work in
accordance with a written scheme of investigation which has been
submitted by the applicant (or their agent) and approved by the
planning authority. 
Page 48 of 64

Page 49

Reason: To ensure the development does not result in the
unnecessary loss of archaeological material. 
5. Development shall not begin until a scheme of hard and soft
landscaping has been submitted to and approved in writing by the
planning authority. Details of the scheme shall include: 
i  existing and finished ground levels and floor levels for all
buildings, roads, parking areas and paths in relation to a
fixed datum;
ii  existing trees, landscaping features and vegetation to be
retained; removed, protected during development and, in the
case of damage, restored;
iii  an Arboricultural Method Statement (AMS) and Tree
Protection Plan (TPP) setting out the specifications and
methodologies for the implementation of tree protection
measures, and methodology for any proposed works that
either encroach within the Root Protection Areas (RPAs) of
retained trees and/or that have the potential to result in loss
or damage to those trees;
iv  proposed new planting including trees, shrubs, hedging and
grassed areas;
v  location and design of any proposed walls, fences and
gates, including those surrounding bin stores or any other
ancillary structures;
vi  schedule of plants to comprise species, plant sizes and
proposed numbers/density;
vii  programme for completion and subsequent maintenance of
all soft and hard landscaping. The landscaping shall be
completed prior to the development being occupied. Any
tree felling or vegetation removal proposed as part of the
landscaping scheme shall take place out with the bird
breeding season (March-August); unless a suitably qualified
ecologist has carried out a walkover survey of the
felling/removal area in the 48 hours prior to the
commencement of felling/removal, and confirmed in writing
that no breeding birds will be affected;
viii proposed car park configuration and surfacing;
ix details of the location (including isolux contour map), design,
height and specification of proposed external lighting
(including floodlights) within the development;
x proposed footpaths and cycle paths within the site; and
xi proposed cycle parking facilities.  
All hard and soft landscaping shall be carried out in accordance with
the scheme approved in writing by the planning authority as the
programme for completion and subsequent maintenance (vii).
Thereafter any trees or shrubs removed, dying, becoming seriously
diseased or damaged within five years of planting shall be replaced
Page 49 of 64

Page 50

in the following planting season by trees/shrubs of a similar species
to those originally required. 
Reason: To ensure that the development is provided with adequate
landscape mitigation and biodiversity habitat enhancements. 
6. Development shall not begin until an Invasive Non-Native Species
(INNS) Survey and, if the presence of INNS are identified by said
survey, an INNS Method statement, outlining the measures to be
taken to remove and prevent the spread of INNS, have been
submitted to and approved in writing by the planning authority.
Development shall thereafter be carried out using the approved
materials or such alternatives as may be agreed in writing with the
planning authority. 
Reason: To ensure that Invasive Non-Native Species are identified
and dealt with in an appropriate manner. 
7. Development shall not begin until a Soil Resource Plan, as detailed
in paragraph 1.1.4 of the approved Outline Soil Management Plan
(Reference – BHS-WAS-XX-XX-RP-L-00201), has been submitted
to and approved in writing by the planning authority. Development
shall thereafter be carried out in accordance with the approved Soil
Resource Plan, or such alternatives as may be approved in writing
with the planning authority. 
Reason: To minimise disturbance to soils from development. 
8. Prior to the occupation of any of the buildings on the site a
Woodland Management Plan shall be submitted to and approved in
writing by the planning authority. Operation of the site thereafter
shall comply with the approved Woodland Management Plan, or
such alternatives as may be agreed in writing by the planning
authority. 
Reason: To protect and manage existing and proposed woodland. 
9. Development shall not begin until details of a scheme to deal with
surface water drainage has been submitted to and approved in
writing by the planning authority. Development shall thereafter be
carried out in accordance with the approved details, or such
alternatives as may be approved in writing with the planning
authority. The buildings hereby approved shall not be occupied until
such time as the approved surface drainage infrastructure has been
installed and is operational. 
Reason: To ensure that surface water drainage is dealt with in a
safe and sustainable manner. 
Page 50 of 64

Page 51

10. The ground level within the flood risk area, as shown tinted blue on
Figure 13 of the approved Flood Risk Assessment Version 2.0,
shall not be raised above the ground levels shown on the approved
Topographical Survey (Existing) Sheets 1 to 11 (inclusive). 
Reason: To prevent displacement of flood waters, which could
increase flood risk elsewhere. 
11. Development shall not begin until details and, if requested, samples
of materials to be used on external surfaces of the buildings; hard
ground cover surfaces; means of enclosure and ancillary structures
have been submitted to and approved in writing by the planning
authority.  Development shall thereafter be carried out using the
approved materials or such alternatives as may be agreed in writing
with the planning authority. 
Reason: To ensure the quality of the development is enhanced by
the use of quality materials to reflect its setting. 
12. Development shall not begin until details of the site access, roads,
footpaths, cycle ways and transportation movements have been
submitted to and approved in writing by the planning authority. 
Details of the scheme shall include: 
i existing and finished ground levels for all roads, footways
and cycle ways in relation to a fixed datum;
ii proposed vehicular, cycle and pedestrian access;
iii proposed roads (including turning facilities), footpaths and
cycle ways within the site;
iv proposed visibility splays, traffic calming measures, lighting
and signage;
v proposed car parking arrangements, including details of the
provision, specification and use of electric vehicle charging
stations;
vi  an Auto Track demonstrating how vehicles using the site,
including service vehicles, will safely enter, exit and circulate
around the site and its parking, pick-up/drop-off and service
areas;
vii a programme for completion for the construction of access,
roads, footpaths and cycle paths. 
Development shall thereafter be carried out in accordance with the
approved details, or such alternatives as may be agreed in writing
with the planning authority.   
Reason: To ensure the future users of the buildings, existing local
residents and those visiting the development site during the
construction process have safe and convenient access to and from
the site. 
Page 51 of 64

Page 52

13. Development shall not be occupied until a new 3-arm roundabout at
the intersection of the A702(T) and Bush Loan Road (as approved
via planning permission 24/00520/DPP, or subsequent applications
amending or replacing said permission) has been constructed and
completed in accordance with the approved plans. 
Reason: To ensure the provision of necessary highway works and
to maintain safety for both the traffic moving to and from the
development. 
14. No part of the development shall be occupied until a comprehensive
Travel Plan that sets out proposals for reducing dependency on the
private car has been submitted and approved in writing by the
planning authority, after consultation with Transport Scotland. This
Travel Plan shall identify measures to be implemented, the system
of management, monitoring, review, reporting and the duration of
the plan. 
Reason: To be consistent with the requirements of National
Planning Framework 4 (NPF4) and PAN 75 Planning for Transport. 
15. Prior to commencement of the development, a Construction Traffic
Management Plan (CTMP) shall be submitted to, and approved by,
the planning authority, after consultation with Transport Scotland.
The CTMP shall include an assessment of historic accidents which
considers the last five full years of available data and shall identify
measures to ensure the construction traffic associated with the
development shall conform to the requirements of the agreed plan. 
Reason: To mitigate the adverse impact of construction traffic on
the safe and efficient operation of the trunk road network. 
16. All construction vehicles transporting dry / loose material to and
from the proposed development shall be sheeted. 
Reason: To mitigate the adverse impact of construction traffic on
the safe and efficient operation of the trunk road network. 
17. Prior to the High School opening to pupils for the first time details of
Safe Routes to School shall be submitted to and approved in writing
by the planning authority. Details shall include the location of the
routes; any necessary improvements or alterations to existing
routes, including signalised crossings; the specification of any new
routes; and a timetable for implementation to ensure that Safe
Routes to School are provided prior to the school opening to pupils
for the first time. Development shall thereafter be carried out in
accordance with the approved details, or such alternatives as may
be approved in writing with the planning authority. 
Page 52 of 64

Page 53

Reason: To ensure that pupils are provided with Safe Routes to
School and to encourage active travel. 
18. Development shall not begin until the further surveys identified in
Table 5 of the approved Preliminary Ecological Appraisal
(December 2024) have been completed and the results submitted
to and approved in writing by the planning authority. Unless
otherwise approved in writing by the planning authority,
development thereafter shall comply with any mitigation and
species enhancement measures detailed in the said surveys. 
19. Development shall comply with the enhancement measures
detailed in in paragraph 4.5.1 of the approved Preliminary
Ecological Appraisal (December 2024) and section 03.03 of the
approved Landscape Strategy Report. 
Reason for conditions 18 and 19: To protect, conserve, restore
and enhance biodiversity. 
20. Prior to the synthetic (3G) pitch being brought into use details of the
location, height, specification and finish of any acoustic fences to be
erected shall be submitted to and approved in writing by the
planning authority. Development shall thereafter be carried out in
accordance with the approved details or such alternatives as may
be approved in writing with the planning authority. 
21. The design and installation of all plant, machinery and equipment
shall be such that the combined noise level shall not exceed NR 30
daytime (07:00 to 23:00 hrs) or NR 25 if the noise is tonal and NR
25 night-time (23:00 to 07:00 hrs) or NR 20 if the noise is tonal as
measured from within any living apartment in any neighbouring
noise-sensitive premises. For the purposes of this condition the
assessment position shall be as identified by BS 7445 in relation to
internal noise measurements. 
Reason for conditions 20 and 21: To safeguard the amenity of
future users of the site, and residential and business properties in
the surrounding area. 
22. Prior to the High School and community facilities being brought into
use the changing place facilities detailed in the approved
Supporting Statement (Section 41B Statement) shall be installed
and operational. 
Reason: To ensure that people with complex care needs are
provide for. 
23. The three new grass pitches and synthetic grass pitch shall be
designed and constructed by a recognised (e.g., SAPCA registered)
specialist pitch contractor. Details of contractor(s) and pitch
Page 53 of 64

Page 54

specifications shall be submitted to, and approved in writing by, the
planning authority prior to the commencement of development.
Thereafter the development shall be completed in accordance with
the approved details 
Reason: To ensure that the pitches are of a suitable quality. 
24. The three new grass pitches and synthetic grass pitch will be fully
operational and available for use prior to the commencement of
development of the grass pitches at the existing Beeslack
Secondary School. 
Reason: To avoid a gap in availability of sports pitches; and to
ensure the timeous delivery of the new pitches. 
25. Development shall not begin until an application for approval of
matters specified in conditions for a Construction Environment
Management Plan (CEMP) has been submitted to and approved in
writing by the planning authority. The CEMP shall include:
i details of construction access routes;
ii  signage for construction traffic, pedestrians and other users
of the site; 
iii controls on the arrival and departure times for construction
vehicles, delivery vehicles and for site workers (to avoid
school arrival/departure times); 
iv. details of piling methods (if employed); 
v. details of any earthworks; 
vi. control of emissions strategy; 
vii. a dust management plan strategy; 
viii. waste management and disposal of material strategy; 
ix. a community liaison representative will be identified to deal
with the provision of information on the development to the
local community and to deal with any complaints regarding
construction on the site; 
x. prevention of mud/debris being deposited on the public
highway; 
xi. material and hazardous material storage and removal; and 
xii. controls on construction, engineering or any other operations
or the delivery of plant, machinery and materials (to take
place between 0700 to 1900hrs Monday to Friday and 0800
to 1300hrs on Saturdays). 
Development shall thereafter be carried out in accordance with the
approved details, or such alternatives as may be approved in
writing with the planning authority. 
Reason: In order to control the construction activity on the site,
ensure environmental impact during the construction period is
acceptable and to ensure appropriate mitigation is in place. 
Page 54 of 64

Page 55

Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:     14 March 2025 
Application No:    24/00415/DPP
Applicant:   Midlothian Council
Agent:              Architype
Validation Date:  25 June 2024 
Contact Person:  Graeme King, Planning Officer 
Email:     graeme.king@midlothian.gov.uk 
Background Papers: 12/00376/PAC, 12/00814/PPP, 17/00428/MSC,
19/00321/MSC, 19/00638/MSC, 22/00581/PAC,
24/00076/PAC
Attached Plans: Location plan, site plans, elevation plans 
Page 55 of 64

Page 56

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2025)
Erection of high school, ASN facility, community
facilities, swimming pool and veterinary clinic;
formation of sports pitches and associated works.
Land East and West of Seafield Moor Road Bilston
Roslin.
File No. 24/00415/DPP
Scale 1:4000Page 56 of 64

Page 57

24 staff
cycle spaces
7C
8C
+167.70
1:30>
+168.00
1:130>
+168.60
1:80>
+168.65
+168.70
+168.57
+168.57
+166.00+167.80
168.10+
+168.585
+168.590
1:30>
+168.25
+168.390 +168.390
1:80>
1:80>
1:60>
1:43>
+167.50
+168.00
+168.40
1:30>
+168.60
168.65+
+168.55
+168.90
+168.80
+166.00
167.25
167.70
167.85
168.60
+168.275 168.275+
+168.476
168.45
+168.585
+168.585
+167.10
+167.15
+167.15
168.60
1:60>
+168.25
+168.24
+168.20
+167.70
3 no. steps
down to pitch
level access
to north corner
+168.65
+169.00
1:50>
1:21>
+168.10
168.15
168.00
167.85
168.15
168.30
168.30
167.85
+167.15
167.55
167.40
167.25
167.70
167.40
167.55
167.70
167.85
168.45
168.60
167.55
168.30
168.15
168.00
167.85
167.70
167.55
167.40
168.15 167.70
168.60
167.25
167.25
168.30
168.15
168.00
167.85
167.70
167.55
167.40
168.15
168.00
167.85
167.70
167.55
168.00
167.85
168.00
168.15
168.30
168.45
168.60
+167.15
167.25
+167.10
1:3>
168.585
1:15>
168.255
1:15>
1:15>
1:15>
167.925
167.595
167.265
168.882+169.30+
1:30>
1:21>
+168.70
+168.60
+168.50
+168.595
+168.45
+169.00
+169.10
+169.00
+168.55
+168.65
+168.65
+169.25
168.585+
+171.75
+166.76+167.10
+168.55+168.60
+168.45
+168.05
+168.15
+168.15
+169.20
<1:55
<1:55
<1:55
<1:55
1:40>
168.65+
168.65+
1:21>
+168.82
+168.90 +168.55
+168.50
+168.90
+168.90
1:60>
1:45>
+168.70
+168.65
1:31>
1:35>
1:14>
1:4>
1:4>
+168.30
+168.70
+168.9
+168.65
+168.05
1:26>
+168.655
+168.43
1:53>
1:60>
1:80>
1:21>
+167.35
+168.115
1:4>
1:24>
+168.585
+168.590
+168.45 +168.45
+168.590
+168.00
+166.00
1:45>
+168.55
1:35>
1:73>
168.20+
168.20+
168.60+
<1:30
<1:41
+167.20
+167.00
1:35>
1:60>
+166.91
1:60>
+168.40
+168.25
+170.50
+168.45
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16
17 18 19 20
23
24
48
49
73
74
86
87
93
94
100
101
107
1A
2A
3A
4A
5A
7A
8A
9A
10A
11A
1C
2C
3C
4C
5C
6C
143
108
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
144
177
178
213
21
22
6A
12A
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
EV
1
2
3
4
5
6
7
8
9
Application site boundary for BHS, ASN Schools & Vet Clinic
Proposed building footprint
Vehicular access to site
Pedestrian access to site
KEY:
3G Pitch
MUGA
60x100m
ASN Block
Pool Block
Sport Block
Arrival Block
Teaching Block
Vet Clinic
ASN Garden
School Courtyard
CN Garden
Service Yard
North Car Park
South Car Park
ASN
Drop off
Coach
Drop off
School Main
Etntrance
Bush Farm Road
Pedastrian route
Pedastrian route
WEST FIELD
BUSH FARM ROAD
SEAFIELD MOOR ROAD
Teaching Block
Sports Block
Arrival
Block
Pool Block
ASN Block
North
0
This drawing is © Architype Ltd. Check this drawing is the latest revision. Do
not scale from this drawing. Do not use the information on this drawing
without checking all dimensions on site. Do not use any areas indicated for
either valuation, puchase, sale or any other form of legally binding contract.
Do not reproduce any part of this drawing withour prior written consent.
Report any discrepancies on this document to Architype. Read this drawing
in conjunction with the associated models, specifications and related
consultant's documents. Equivalent products / materials may be Approved
where the Employer's Requirements, Thermal Performance, Airtightness and
any other specified performance requirements are met. Subject to Architype
"Acceptance". All materials to be certified to comply with BS 14001/or
BES6001. All timber species and sources used in this development are not to
be listed on the CITES appendices for endangered or threatened species
(appendix I, II or III).
Notes
Client
Project
25 50m
Graphic Scale 1:500
LONDON 020 7403 2889             EDINBURGH 0131 516 1861HEREFORD 01981 542 111    
WWW.ARCHITYPE.CO.UK
Internal Proj Ref Model Ref
Date Scale
RevDescriptionStatus
Project Originator Form RoleFunction Number
Drawing Title
Space
Drawn
Checked
Beeslack High School
Midlothian Council
10302 10302_ART_MAIN JB
24/06/2024
S4 Suitable for Stage Approval
1 : 500 @ A0
P01
BHS - ART - ZZ - 00 - D - A -
Proposed Block Plan (1 of 2)
40003
DJN
Please refer to
BHS-ART-XX-00-D-A-40004
for extent of east of site.
Rev Date Description Drawn Checked
P01 24/06/24 Issued for Planning Application DJN JB
Page 57 of 64

Page 58

7C
8C
FFL 168.150
+167.70
1:30>
+166.00+167.80
168.10+
+166.00
167.70
167.85
+168.585
+167.10
+167.15
+167.15
1:21>
167.85
167.85
+167.15
167.55
167.40
167.25
167.70
167.40
167.55
167.70
167.85
168.00
167.85
168.00
167.25
+167.10
1:3>
168.585
1:15>
168.255
1:15>
1:15>
1:15>
167.925
167.595
167.265
+166.76
+168.00
+166.00
+167.20
+167.00
4A
5A
7A
8A
9A
10A
11A
1C
2C
3C
4C
5C
6C
143
EV
EV
EV
EV
EV
EV
EV
EV
144
177
178
213
6A
12A
EV
EV
EV
Application site boundary for BHS, ASN Schools & Vet Clinic
Proposed building footprint
Vehicular access to site
Pedestrian access to site
KEY:
Rugby Pitch
Size 2
50x85m
Football Pitch
60x90m
Rugby Pitch
Size 1
65x95m
South Car Park
Coach
Drop off
Pedastrian route
Pedastrian route
BLISTON
PRIMARY
SCHOOL
SEAFIELD MOOR ROAD
SEAFIELD ROAD
WOODFIELD PARK
CASTLELAW
CRESCENT
Teaching Block
Sports Block
Arrival
Block
Pool Block
ASN Block
North
0
This drawing is © Architype Ltd. Check this drawing is the latest revision. Do
not scale from this drawing. Do not use the information on this drawing
without checking all dimensions on site. Do not use any areas indicated for
either valuation, puchase, sale or any other form of legally binding contract.
Do not reproduce any part of this drawing withour prior written consent.
Report any discrepancies on this document to Architype. Read this drawing
in conjunction with the associated models, specifications and related
consultant's documents. Equivalent products / materials may be Approved
where the Employer's Requirements, Thermal Performance, Airtightness and
any other specified performance requirements are met. Subject to Architype
"Acceptance". All materials to be certified to comply with BS 14001/or
BES6001. All timber species and sources used in this development are not to
be listed on the CITES appendices for endangered or threatened species
(appendix I, II or III).
Notes
Client
Project
10 20m
Graphic Scale 1:200
LONDON 020 7403 2889             EDINBURGH 0131 516 1861HEREFORD 01981 542 111    
WWW.ARCHITYPE.CO.UK
Internal Proj Ref Model Ref
Date Scale
RevDescriptionStatus
Project Originator Form RoleFunction Number
Drawing Title
Space
Drawn
Checked
Beeslack High School
Midlothian Council
10302 10302_ART_MAIN JB
24/06/2024
S4 Suitable for Stage Approval
1 : 500 @ A0
P01
BHS - ART - ZZ - 00 - D - A -
Proposed Block Plan (2 of 2)
40004
DJN
Please refer to BHS-ART-
XX-00-D-A-40003 for
extent of West of site.
Rev Date Description Drawn Checked
P01 24/06/24 Issued for Planning Application DJN JB
Page 58 of 64

Page 59

Path
Path
LB
SEAFIELD MOOR ROAD
Sta
Sub
167.3m
El
+44 (0)141 220 2000
+44 (0)141 220 2001
Date
Designed
Revision
Scale
Drawing Number
Drawing Title
Project TitleDrawing Status
Date Date Date
Drawn Checked AuthorisedClient
Original Size
Suitability
Millimetres
100
10
0
Copyright   C   ATKINSRÉALIS (2023) www.atkinsrealis.com
Tel:
Fax:
Filename: P:\GBGW
A\DE\PROJECTS\5211589 First Opinion Practice – UofE\400_Technical Info\401_CAD_BIM\01-W
IP\Architect\DR\11\UOEFOP-ATK-ZZ-00-DR-AR-000001.dwg
USER: DOAK9227
Date: 31/5/24 
13:48:39
DO NOT SCALE
ATKINSRÉALIS
ATLANTIC SQUARE
31 YORK STREET
GLASGOW
G2 8NJ
FIRST OPINION PRACTICE
EASTER BUSH CAMPUS
UNIVERSITY OF EDINBURGH
PROPOSED SITE PLAN
LDLD SG DR
02.03.2202.03.22 02.03.22 02.03.22
1:500
S2
UOEFOP-ATK-ZZ-00-DR-AR-000001 P
SUITABLE FOR INFORMATION
01
A1
UNIVERSITY OF EDINBURGH
Rev. Date Description By Chk'd App'd
P01 31.05.24 FOR PLANNING MP LD DR
0 20 40 60
SCALE 1:500
5010 30
SEAFIELD MOOR ROAD
SEAFIELD ROAD
BUSH FARM ROAD
Midlothian
Innovation
Centre
[01]
[02]
PARKING PROVSION
Car Parking
Midlothian Council Parking Standards (Table 7)
Staff = 20
= 0.5 x 20
=10 spaces
Students = 14
No student car parking is provided on site.
Student car parking is provided at the Royal
(Dick) School of Veterinary Studies at the main
campus.
Visitors = 4 per consulting room (4x8)
= 32 spaces
Total = 42 spaces
Cycle Parking
Staff = 1 space plus 1 space per 20 staff
= 3 spaces (20 staff +14 students)
Visitors = 1 space per 2 consulting rooms
= 4 spaces
Total = 7 spaces
[03]
DRAWING KEY
Building Entrance
Vehicular Access
Pedestrian + Cycle Access
Soft Landscaping
Hard Landscaping
Asphalt Vehicular Road
Electrical Vehicle Charging Point
Proposed Sewer Diversion
Extent of Flood Plain within FOP
Boundary
EXTERNAL PLANT + REFUSE
Gas store 4.5m x 7.0m concrete slab with open
mesh fencing and gates (final storage requirments
subject to confirmation of use profile by UoE)
All in accordance with BOC guidance /
requirements on gas storage.
Generator on 4.0 x 6.75m concrete slab enclosed
in 1.8m high closed timber boarding including
double gate and digilock.
Refuse store on 3.0m x 6.75m concrete slab
enclosed in 1.8m high closed timber boarding
including double gate, digilock and drainage gully.
1 x 240 litre Food waste bin
1 x 1100 litre General waste bin
1 x 1100 litre Dry mixed recycling bin
2 x 660 litre Clinical waste bins
NEW JUNCTION / SHARED ACCESS ROAD
The Developer of the adjacent school site will be
responsible for forming the new junction and
shared access road from Bush Farm Road and
confirming visibility splays.
SITE AREA
[04]
Proposed
Beeslack
School
DRAWING KEY
[1] New junction and access road formed by MLC as part
of enabling works
[2] Existing bus stop
[3] Entrance Plaza/ Planters/ Sheffield Cycle Stands
[4] Medical Gas Store (subject to confirmation
of user requirements)
[5] Generator Store
[6] Refuse Store
[7] Substation taking new incoming HV connection
from solar farm
[8] Car park
[9] External mechanical plant compound
[10] Secure courtyard
[11] Temporary generator location
[12] SUDs basin
[05]
[06][07]
[08]
[09]
[09]
[10]
[11]
[12]
[13]
[14]
[15]
[16]
[17]
[18]
[13] Staff breakout / patio
[14] Existing sewer to be diverted by MLC as part of
enabling works
[15] Proposed sewer diversion and wayleave
[16] Proposed Beeslack Secondary School
[17] Flood zone
[18] Grasscrete blocks to service access
DRAWING TO BE READ IN CONJUNCTION WITH
LANDSCAPE DRAWING UOEFOP-ATK-ZZ-00-DR-LA-400001
Page 59 of 64

Page 60

Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
13 10 1213
82 94
AC B
1615 11 1516
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
4125
4125
4435
1100
10 13 12 19
7 9 2
512 12 12121212 13 13
1 3
15
A
B
C
A
14060
16885
16
18 18
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
1212 12 12 12 121013
814292
75 1516 14 17
B
A
17
8
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
9 2
712 12 1212
8
A
B
6
1716
A. Brickwork
Building Plinth
B. Metal Cladding - vertical serated profile
Upper levels cladding
C. Metal Cladding (small format / accent panels)
Windows Surround
D. Metal Cladding - Standing seam
Feature Material- Selected elevtions
Main Material Key: 1. Curtain Wall
Aluminium triple glazed curtain
walling system.
2. Windows
Aluminium triple glazed window
system.
3. Doors
Aluminium clad external doors to
plant rooms.
4. Glazed Doors
External metal triple glazed doors
with frame surround.
5. Rainwater Goods
Metal rainwater goods, PPC finish.
6. Window Fins
PPC aluminium extrusion.
7. Capping
PPC aluminium.
8. Canopy
PPC aluminium.
9. Louvres
PPC aluminium louvred panels for
ventilation.
10. Rooflights
Aluminium triple glazed rooflights
with insulated kerb.
11. Metal Balustrade
PPC aluminium.
E. Brickwork with glazed brick
ASN internal garden
12. Indicative MEP Equipment
13. Roof Plant Screen
14. Metal flashing
PPC aluminium.
15. Metal Roof Access
Stairs/Ladders
16. Feature WindowSurround
PPC aluminium.
17. Brise Soliel
PPC aluminium brise soliel on
south elevation.
18. Dry Riser
F. Metal Cladding Feature Material
Main Entrance
Teaching Block
Sports Block
Arrival
Block
Pool Block
ASN Block
0
This drawing is © Architype Ltd. Check this drawing is the latest revision. Do
not scale from this drawing. Do not use the information on this drawing
without checking all dimensions on site. Do not use any areas indicated for
either valuation, puchase, sale or any other form of legally binding contract.
Do not reproduce any part of this drawing withour prior written consent.
Report any discrepancies on this document to Architype. Read this drawing
in conjunction with the associated models, specifications and related
consultant's documents. Equivalent products / materials may be Approved
where the Employer's Requirements, Thermal Performance, Airtightness and
any other specified performance requirements are met. Subject to Architype
"Acceptance". All materials to be certified to comply with BS 14001/or
BES6001. All timber species and sources used in this development are not to
be listed on the CITES appendices for endangered or threatened species
(appendix I, II or III).
Notes
Project Originator Form RoleFunction Number
Internal Proj Ref Model Ref
Drawn
Checked
Date Scale
RevDescriptionStatus
Client
Project
Drawing Title
LONDON 020 7403 2889             EDINBURGH 0131 516 1861HEREFORD 01981 542 111    
WWW.ARCHITYPE.CO.UK
10 20m
Graphic Scale 1:200
Keyplan
Space
10302 10302_ART_MAIN
GP
FH
Suitable for Stage Approval
As indicated @ A1
Beeslack High School
Midlothian Council
Planning - Teaching Building Elevations
43002
24/06/2024
P01S4
BHS - ART - ZZ - ZZ - D - A -
North
W
est
East
South
Teaching Building - East Elevation3
Teaching Building - North Elevation1
Teaching Building - South Elevation4
Teaching Building - West Elevation2
Rev Date Description Drawn Checked
P01 24/06/24 Isssued for Planning MS JB
Page 60 of 64

Page 61

Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
5 7 213 12 12 121316 141 12
11325
10250
14360
16885
B A
F
A
B
A
C
18 18
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
1 4
4 3 5
10
7 2
12 1212
16
B
D B
A
17 16
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
7
3
A
B
A. Brickwork
Building Plinth
B. Metal Cladding - vertical serated profile
Upper levels cladding
C. Metal Cladding (small format / accent panels)
Windows Surround
D. Metal Cladding - Standing seam
Feature Material- Selected elevtions
Main Material Key: 1. Curtain Wall
Aluminium triple glazed curtain
walling system.
2. Windows
Aluminium triple glazed window
system.
3. Doors
Aluminium clad external doors to
plant rooms.
4. Glazed Doors
External metal triple glazed doors
with frame surround.
5. Rainwater Goods
Metal rainwater goods, PPC finish.
6. Window Fins
PPC aluminium extrusion.
7. Capping
PPC aluminium.
8. Canopy
PPC aluminium.
9. Louvres
PPC aluminium louvred panels for
ventilation.
10. Rooflights
Aluminium triple glazed rooflights
with insulated kerb.
11. Metal Balustrade
PPC aluminium.
E. Brickwork with glazed brick
ASN internal garden
12. Indicative MEP Equipment
13. Roof Plant Screen
14. Metal flashing
PPC aluminium.
15. Metal Roof Access
Stairs/Ladders
16. Feature WindowSurround
PPC aluminium.
17. Brise Soliel
PPC aluminium brise soliel on
south elevation.
18. Dry Riser
F. Metal Cladding Feature Material
Main Entrance
Teaching Block
Sports Block
Arrival
Block
Pool Block
ASN Block
0
This drawing is © Architype Ltd. Check this drawing is the latest revision. Do
not scale from this drawing. Do not use the information on this drawing
without checking all dimensions on site. Do not use any areas indicated for
either valuation, puchase, sale or any other form of legally binding contract.
Do not reproduce any part of this drawing withour prior written consent.
Report any discrepancies on this document to Architype. Read this drawing
in conjunction with the associated models, specifications and related
consultant's documents. Equivalent products / materials may be Approved
where the Employer's Requirements, Thermal Performance, Airtightness and
any other specified performance requirements are met. Subject to Architype
"Acceptance". All materials to be certified to comply with BS 14001/or
BES6001. All timber species and sources used in this development are not to
be listed on the CITES appendices for endangered or threatened species
(appendix I, II or III).
Notes
Project Originator Form RoleFunction Number
Internal Proj Ref Model Ref
Drawn
Checked
Date Scale
RevDescriptionStatus
Client
Project
Drawing Title
LONDON 020 7403 2889             EDINBURGH 0131 516 1861HEREFORD 01981 542 111    
WWW.ARCHITYPE.CO.UK
10 20m
Graphic Scale 1:200
Keyplan
Space
10302 10302_ART_MAIN
FH
Checker
Suitable for Stage Approval
As indicated @ A1
Beeslack High School
Midlothian Council
Planning - Arrival and Sports Block
Elevations
43001
24/06/2024
P01S4
BHS - ART - 01 - ZZ - D - A -
East
West
South
North
1 : 200
Arrival and Sports Building - East Elevation1
1 : 200
Arrival and Sports Building - West Elevation2
1 : 200
Sports Building - South Elevation4
Rev Date Description Drawn Checked
P01 24/06/24 Isssued for Planning MS JB
Page 61 of 64

Page 62

Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
12 7 75
38
10 11
D A
10217
8875
13 11 16
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
Ground Level
0
Roof Level
4000
1100
4435
4125
4125
1
49
10
1
88
1
7
4 5
12 1213
E
D
D A
10217
14125
10250
15 1311
Level 00
0
Level 01
4125
Level 02
8250
Roof Level
12685
Parapet Level
13785
1100
4435
4125
4125
12
1
13 13
5
D
A
Ground Level
0
Roof Level
4000
98 2 1 2
4
8 5
3
10 7
A
D
A
Ground Level
0
Roof Level
4000
1 8429
10 2
2
E
D D
A. Brickwork
Building Plinth
B. Metal Cladding - vertical serated profile
Upper levels cladding
C. Metal Cladding (small format / accent panels)
Windows Surround
D. Metal Cladding - Standing seam
Feature Material- Selected elevtions
Main Material Key: 1. Curtain Wall
Aluminium triple glazed curtain
walling system.
2. Windows
Aluminium triple glazed window
system.
3. Doors
Aluminium clad external doors to
plant rooms.
4. Glazed Doors
External metal triple glazed doors
with frame surround.
5. Rainwater Goods
Metal rainwater goods, PPC finish.
6. Window Fins
PPC aluminium extrusion.
7. Capping
PPC aluminium.
8. Canopy
PPC aluminium.
9. Louvres
PPC aluminium louvred panels for
ventilation.
10. Rooflights
Aluminium triple glazed rooflights
with insulated kerb.
11. Metal Balustrade
PPC aluminium.
E. Brickwork with glazed brick
ASN internal garden
12. Indicative MEP Equipment
13. Roof Plant Screen
14. Metal flashing
PPC aluminium.
15. Metal Roof Access
Stairs/Ladders
16. Feature WindowSurround
PPC aluminium.
17. Brise Soliel
PPC aluminium brise soliel on
south elevation.
18. Dry Riser
F. Metal Cladding Feature Material
Main Entrance
Ground Level
0
Roof Level
4000
8 2 5 10
39
A
D6100
8951
3050
Teaching Block
Sports Block
Arrival
Block
Pool Block
ASN Block
0
This drawing is © Architype Ltd. Check this drawing is the latest revision. Do
not scale from this drawing. Do not use the information on this drawing
without checking all dimensions on site. Do not use any areas indicated for
either valuation, puchase, sale or any other form of legally binding contract.
Do not reproduce any part of this drawing withour prior written consent.
Report any discrepancies on this document to Architype. Read this drawing
in conjunction with the associated models, specifications and related
consultant's documents. Equivalent products / materials may be Approved
where the Employer's Requirements, Thermal Performance, Airtightness and
any other specified performance requirements are met. Subject to Architype
"Acceptance". All materials to be certified to comply with BS 14001/or
BES6001. All timber species and sources used in this development are not to
be listed on the CITES appendices for endangered or threatened species
(appendix I, II or III).
Notes
Project Originator Form RoleFunction Number
Internal Proj Ref Model Ref
Drawn
Checked
Date Scale
RevDescriptionStatus
Client
Project
Drawing Title
LONDON 020 7403 2889             EDINBURGH 0131 516 1861HEREFORD 01981 542 111    
WWW.ARCHITYPE.CO.UK
10 20m
Graphic Scale 1:200
Keyplan
Space
10302 10302_ART_MAIN
GP
FH
Suitable for Stage Approval
As indicated @ A1
Beeslack High School
Midlothian Council
Planning - Pool Elevations
43003
24/06/2024
P01S4
BHS - ART - ZZ - ZZ - D - A -W
est
South
North
1 : 200
Swiming Pool - North Elevation1
1 : 200
Swimming Pool - South Elevation + ASN - South Elevation2
1 : 200
Swimming Pool - West Elevation3
1 : 200
ASN - East Elevation4
1 : 200
ASN - West Elevation5
Rev Date Description Drawn Checked
P01 24/06/24 Isssued for Planning MS JB
1 : 200
ASN - North Elevation6
W
est
North
East
Page 62 of 64

Page 63

0 5 10 m
www.atkinsrealis.com
©  AtkinsRéalis (2023)
SAFETY, HEALTH AND ENVIRONMENTAL
INFORMATION
In addition to the hazards/risks normally associated with the types of work
detailed on this drawing, note the following:
CONSTRUCTION
MAINTENANCE/CLEANING
DECOMMISSIONING/DEMOLITION
It is assumed that all works will be carried out by a competent contractor
working, where appropriate, to an approved method statement
Date
DesignedScale
Drawing Title
Project Title
Date Date Date
Drawn Checked Authorised
Original Size
Drawing Number Revision
Drawing Suitability
Client
Status
Millimetres
100
10
0
DO NOT SCALE
A1
CLASSIFICATION - CONTAINS BASELINE INFORMATION
CLASSIFICATION - CONTAINS BASELINE INFORMATION
Rev. Date Description By Chk'd App'd
Tel:
1 : 100
P01
PLANNING ELEVATIONS
FIRST OPINION PRACTICE
LD
11.04.2024
MP
11.04.2024
LD
11.04.2024
DR
11.04.2024
UOEFOP-ATK-ZZ-ZZ-DR-AR-003101
SUITABLE FOR INFORMATION S2
Atkins Project Number: 5211589
UNIVERSITY OF EDINBURGH
AtkinsRéalis
2 Atlantic Square
York Street
Glasgow
G2 8NJ
0141 220 2000
P01 31.05.2024 FOR PLANNING MP LD      DR
1 : 100
EAST ELEVATION2
1 : 100
NORTH ELEVATION1
+3.00m
+4.50m
+6.95m
+0.00 FFL
+3.00m
+4.50m
+6.95m
+0.00 FFL
01.
02.
04.
06.
01. 03.
02.
06. 06. 06.
06.06.06.06.
06.02.
02.
02.
02.
11.
01. Facing brick piers (warm tone)
02. Flat lock metal cladding panels to walls and angled roofs, light colour
03. T+G vertical timber cladding
04. Facing brick (warm tone)
05. Metal downpipes and hoppers to match cladding
06. Aluminium CW with opening lights - silver anodised
07. Glazed aluminium doors - Silver anodised
08. Aluminium louvred door - Silver anodised
09. Steel doors - RAL9022 Pearl Light Grey
10. Metal flashings and parapet capping
11. Signage 'First Opinion Practice' Letters 350mm high internally illuminated formed in metal/acrylic raised 75mm
and back lit and secured to facade with secret fixings.
12. Signage 'Peter R. Beaumount Small Animal Practice' Letters 200mm high internally illuminated formed in
metal/acrylic on opaque glass panel supported on pegs
13. Green roof - sedum & native wildflower blanket system
14. Honeycomb brickwork to external plant enclosure to provide ventilation for mechanical plant
12.
13.
13.
05. 05. 05. 05.14.
10.
10.
Page 63 of 64

Page 64

0 5 10 m
www.atkinsrealis.com
©  AtkinsRéalis (2023)
SAFETY, HEALTH AND ENVIRONMENTAL
INFORMATION
In addition to the hazards/risks normally associated with the types of work
detailed on this drawing, note the following:
CONSTRUCTION
MAINTENANCE/CLEANING
DECOMMISSIONING/DEMOLITION
It is assumed that all works will be carried out by a competent contractor
working, where appropriate, to an approved method statement
Date
DesignedScale
Drawing Title
Project Title
Date Date Date
Drawn Checked Authorised
Original Size
Drawing Number Revision
Drawing Suitability
Client
Status
Millimetres
100
10
0
DO NOT SCALE
A1
CLASSIFICATION - CONTAINS BASELINE INFORMATION
CLASSIFICATION - CONTAINS BASELINE INFORMATION
Rev. Date Description By Chk'd App'd
Tel:
1 : 100
P01
PLANNING ELEVATIONS
FIRST OPINION PRACTICE
LD
11.04.2024
MP
11.04.2024
LD
24.05.2024
DR
24.05.2024
UOEFOP-ATK-ZZ-ZZ-DR-AR-003102
SUITABLE FOR INFORMATION S2
Atkins Project Number: 5211589
UNIVERSITY OF EDINBURGH
AtkinsRéalis
2 Atlantic Square
York Street
Glasgow
G2 8NJ
0141 220 2000
P01 31.05.2024 FOR PLANNING MP LD      DR
1 : 100
SOUTH ELEVATION_A3
1 : 100
SOUTH ELEVATION_B3.
1 : 100
WEST ELEVATION4
+3.00m
+4.50m
+6.95m
+0.00 FFL
+3.00m
+4.50m
+6.95m
+0.00 FFL
01.
02. 02.
02.
04.
04.
06. 07.06.
06.
07. 07. 08.
09. 09. 09.
02.
06.
06.
+3.00m
+4.50m
+6.95m
+0.00 FFL
13.
13.
13.
05. 05.
10.
14.
10.
10.
14.
01. Facing brick piers (warm tone)
02. Flat lock metal cladding panels to walls and angled roofs, light colour
03. T+G vertical timber cladding
04. Facing brick (warm tone)
05. Metal downpipes and hoppers to match cladding
06. Aluminium CW with opening lights - silver anodised
07. Glazed aluminium doors - Silver anodised
08. Aluminium louvred door - Silver anodised
09. Steel doors - RAL9022 Pearl Light Grey
10. Metal flashings and parapet capping
11. Signage 'First Opinion Practice' Letters 350mm high internally illuminated formed in metal/acrylic raised 75mm
and back lit and secured to facade with secret fixings.
12. Signage 'Peter R. Beaumount Small Animal Practice' Letters 200mm high internally illuminated formed in
metal/acrylic on opaque glass panel supported on pegs
13. Green roof - sedum & native wildflower blanket system
14. Honeycomb brickwork to external plant enclosure to provide ventilation for mechanical plant