PLANNING COMMITTEE
TUESDAY 12 MARCH 2024
ITEM NO 
PLANNING APPLICATION (23/00595/DPP) FOR THE FORMATION OF
RECYCLING FACILITY AND WASTE TRANSFER STATION; AND THE
CONTINUATION OF LANDFILL OPERATIONS AND ASSOCIATED WORKS
AT MIDDLETON LOWER QUARRY, GOREBRIDGE 
PROCEDURES FOR A NATIONAL DEVELOPMENT – HOLDING A HEARING 
Report by Chief Officer Place 
1 PURPOSE OF REPORT 
1.1 The purpose of this report is to advise the Committee of a planning
application of a scale that defines it as a National Development for the
formation of a recycling facility and waste transfer station;
continuation of landfill operations and associated works at Middleton
Lower Quarry, Gorebridge.  This report outlines the development
proposal and the procedures required in the assessment of a National
Development. 
2 BACKGROUND 
2.1 In March 1982 planning permission 198/81 was granted for the extraction
and working of limestone on both Middleton Quarries No.1 (the lower
quarry) and No.2 (the upper quarry).  Planning permission 198/81 was
implemented. 
2.2 In December 2012 a Breach of Condition Notice was served on Leiths
(Scotland) Limited, who were the operator of the Middleton Quarry.  The
notice required them to take action in relation to conditions attached to
planning permission 198/81, in particular those conditions requiring the
infilling of the quarry and its restoration to an agricultural use by the 19
December 2016.  The Breach of Condition Notice only required the
reinstatement of Quarry No.2. Quarry No.2 (also known as the upper quarry)
is presently being infilled in compliance with the Breach of Condition Notice. 
2.3 Planning permission 15/00503/DPP for the infilling of Quarry No. 1 (the
lower quarry) was granted subject to conditions. The planning permission
was subject to a time limitation condition which required the works to be
completed within seven years of commencement. 
2.4 A section 42 application (22/00546/S42) to amend condition 1 of planning
permission 15/00503/DPP (infilling of quarry), in order to extend the duration
of the temporary permission until 31 March 2024, and condition 3, to allow

Page 2

the acceptance of non-hazardous waste, was granted planning permission
by the Committee at its meeting in January 2023. 
2.5 A further section 42 application (23/00773/S42) to amend conditions 1 and 6
of planning permission 22/00546/S42, to extend the timeframe of operations
at the Middleton Limeworks is currently pending consideration.  This
application is a ‘major’ scale proposal as defined by the regulations and will
be determined by the Committee. 
2.6 A pre-application consultation (22/00856/PAC) for change of use of land to a
recycling facility and the continuation of landfill operations at Middleton
Lower Quarry was considered by the Committee at its meeting of January
2023. 
3 PLANNING PROPOSALS 
3.1 The application site relates to Quarry No. 1 (the lower quarry).  The
application site is a former limestone quarry, located in the countryside in
close proximity to the south of North Middleton. 
3.2 Planning permission is sought through planning application 23/00595/DPP
for the formation of a recycling facility and waste transfer station;
continuation of landfill operations and associated works at Middleton Lower
Quarry, Gorebridge, for a period of 17 years.  The timescales include one
year for installation of recycling plant infrastructure,15 years operating the
recycling facility and one year to reinstate the site. 
3.3 The on-site activities proposed include the recycling of inert waste and the
excavation/infilling of the quarry void with inert waste.  The proposal also
includes provision for waste storage prior to recycling, the storage of
recycled aggregates prior to despatch, and for waste placement within the
quarry void. 
4 PROCEDURES 
4.1 The National Planning Framework 4 (NPF4) sets out 18 National
Developments within an annex of the document.  ‘National Development
Four’ relates to Circular Economy Materials Management Facilities and
defines national developments as a development contributing to ‘Circular
Economy Materials Management Facilities’ in the location described, within
one or more of the Classes of Development described below and that is of a
scale or type that would otherwise have been classified as ‘major’ by ‘The
Town and Country Planning (Hierarchy of Developments) (Scotland)
Regulations 2009’: 
a) Facilities for managing secondary materials; and
b) Recycling facilities 
4.2 Planning application 23/00595/DPP is of such a scale that it would be
described as a major development.  However, on account of it complying
with the definition outlined above it falls within the category of being a
national development.

Page 3

4.3  Planning applications which fall within the definition of national
developments are subject to different procedural requirements than those
which are for major scale developments.  The key difference between
processing a planning application for a national development and a planning
application for a major development is the need to comply with regulation 27
(Pre-determination hearings) of The Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2013, which
states: 
(1) Before determining an application for planning permission for a
development within the classes of development specified in paragraph
(2), the planning authority are to give to the applicant and to persons
who submit representations to the planning authority in respect of that
application in accordance with these Regulations an opportunity of
appearing before and being heard by a committee of the authority.
(2) The classes of development prescribed for the purposes of section
38A(1) of the Act (pre-determination hearings) are developments within
the categories of—
(a)national developments; and
(b)major developments which are significantly contrary to the
development plan.  
4.4 The decision on whether a pre-determination hearing takes place will
depend upon whether or not the applicant or representor(s) wish to take up
the opportunity of appearing before a committee of the authority to make
oral representations.  At present the planning application has received 22
valid objections and a petition containing 163 names.  Given the number of
representors it is likely that some may wish to make oral representations to
the Committee and, therefore, it may be necessary to hold a pre-
determination hearing for this planning application. 
4.5 The current expectation is to schedule a Committee site visit and hold a pre-
determination hearing in May 2024 and then report the application to the
Committee for determination at its meeting of 4 June 2024 (subject to the
required planning application consultation responses being received in
time). 
4.6  Should the applicant and representors/interested parties not wish to attend a
pre-determination hearing it is possible for the Committee to determine the
planning application without holding a pre-determination hearing. 
4.7 Should it be necessary to convene a pre-determination hearing elected
members will need to be aware that they are not deciding the planning
application during the hearing – the hearing is primarily an opportunity for
elected members to hear oral representations from the applicant and
interested parties and to ask questions for clarification of those parties
making those representations.  The Scottish Government’s Guidance on the
Role of Councillors in Pre-Determination Procedures provides for
Councillors to express a ‘without prejudice’ view and to identify material
considerations with regard to a planning application. Councillors are entitled
to take part in the decisions to be made by the full Council/Planning

Page 4

Committee even though they may have expressed an opinion on the
application at a pre-determination hearing or at the Committee. 
4.8 The Committee may wish to express a ‘without prejudice’ view and to raise
any material considerations which they wish the applicant and/or officers to
consider.  Views and comments expressed by the committee will be entered
into the minutes of the meeting and relayed to the applicant for
consideration. 
4.9 The Scottish Government’s Guidance on the Role of Councillors in Pre-
Determination Procedures advises that Councillors are expected to
approach their decision-making with an open mind in that they must have
regard to all material considerations and be prepared to change their views
which they are minded towards if persuaded that they should. 
5   Recommendation 
5.1 It is recommended that the Committee note the contents of the report and
instruct officers to make the arrangements for a pre-determination hearing
and a site visit. 
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager 
Date:    1 March 2024
Application No:   23/00595/DPP
Applicant:    The NWH Group
Agent:    William Booth, Dalgleish Associates Ltd
Validation Date:   8 November 2023 
Contact Person:   Whitney Lindsay
Email:    Whitney.Lindsay@midlothian.gov.uk 
Background Papers: Planning applications 15/00503/DPP,
22/00546/S42, 22/00856/PAC and 23/00773/S42
Attached Plan:  Location plan.

Page 5

Reproduced from the Ordnance Survey map with the permission of the
controller of Her Majesty's Stationary Office. Crown copyright reserved.
Unauthorised reproduction infringes Crown copyright and may lead to
prosecution or civil  proceedings
Midlothian Council Licence No. AC0000811376 (2024)
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
Planning Service
Place Directorate
Formation of recycling facility and waste transfer station;
continuation of landfill operations and associated works at
Middleton Lower Quarry, Gorebridge,
File No: 23/00595/DPP
Scale:1:4,000 ±