Democracy Spraffa

Agenda Document Pack - Planning Committee - 28/04/2026

Midlothian Council · 28 April 2026
Back to Planning Committee — 28 April 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda
Planning Committee
Venue: Virtual Meeting,
Date: Tuesday, 28 April 2026
Time: 14:00
Executive Director : Place
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk
Further Information:
This is a meeting which is open to members of the public.
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 118

Page 2

1          Welcome, Introductions and Apologies
2          Order of Business
Including notice of new business submitted as urgent for consideration at the
end of the meeting.
3          Declaration of Interest
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest.
4          Minute of Previous Meeting
4.1 Minute of the Meeting of Planning Committee of 9 March 2026
submitted for approval
3 - 12
4.2 Action Log 13 - 16
5          Public Reports
5.1 26/00189/PAC - Whitehills, Millerhill Pre-Application -
Consultation for Tennis and Padel Centre, report by Chief Officer
Place
17 - 24
5.2 25/00306/DPP - Land at Mavisbank Estate, Loanhead -
Formation of Access and Associated Works, report by Chief
Officer Place
25 - 66
5.3 25/00155/MSC - Hopefield Farm 2, Bonnyrigg - Matters Specified
in Conditions Relating to Infrastructure, report by Chief Officer
Place
67 - 118
6          Private Reports
No items for discussion
7          Date of Next Meeting
The next meeting will be held on Monday 8th June 2026.
Page 2 of 118

Page 3

INTERNAL USE ONLY
DRAFT BY/DATE:
REVIEW BY/DATE:
1-993
Minute of Meeting
Planning Committee
Tuesday 28 April 2026
Item No 4.1
Planning Committee
Date Time Venue
Monday 9 March 2026 13.00 Normandy Court / MS Teams
Present:
Councillor Imrie (Chair) Councillor Alexander (Virtual)
Councillor Bowen (Virtual) Councillor Cassidy
Councillor Curran (Virtual) Councillor Drummond
Councillor McCall (Virtual) Councillor McEwan
Councillor McKenzie Councillor McManus
Councillor Milligan Councillor Parry
Councillor Pottinger (Virtual) Councillor Russell
Councillor Scott (Virtual) Councillor Smaill
Councillor Winchester
In attendance:
Kevin Anderson (Virtual) Executive Director Place
Peter Arnsdorf Head of Placemaking and Chief Planning
Officer
Grace Cowan (Virtual) Head of Primary Care and Older People's
Services
William Venters Principal Solicitor
Lindsay Thomson Commercial Solicitor
Maria Perez Democratic Services Officer
Nicola Thorburn Democratic Services Team Leader
1. Welcome and Apologies
Councillor Imrie (Chair) welcomed everyone to the meeting of the Planning Committee.
Page 3 of 118

Page 4

No apologies were presented.
2. Order of Business
The order of business is as per the agenda.
3. Declaration of Interest
The Chair invited the Planning Committee Members to declare their interest on any
items of the agenda and advised that declarations of interest and transparency
statements can also be presented when any relevant items are discussed.
No declarations of interest were intimated at this stage of the proceedings
4. Minutes of Previous Meeting
The Minute of the Planning Committee meeting of 20 January 2026 was submitted for
approval and unanimously approved as the correct record.
The Action Log was noted and the Planning Committee agreed for items marked for
closure to be removed.
Councillor Scott discussed an arising matter on the play strategy, which is marked as
an action recommended for closure on the log. Councillor Scott asked whether there
is a presumption that, whenever possible, developers will invest on improving an
existing play park. The Head of Placemaking and Chief Planning Officer advised that
the preferred course of action depends on the actual site, as large sites can opt for
creating play facilities onsite, whereas other sites can opt for creating offsite provision
by improving existing areas. Councillor Scott advised it would be desirable to obtain
reassurance that the play equipment is future proof and that play areas are not
removed, referring to a recent incident in Gorebridge. The Head of Placemaking and
Chief Planning Officer advised that, on this instance, the issue may have been
connected to a breach of planning control and advised that the matter would be
discussed directly with Councillor Scott. 
Councillor Smaill asked for an update on when Mavisbank House would be brought
back to the Planning Committee and cited community interest on the matter. The Head
of Placemaking and Chief Planning Officer advised that the applicants have submitted
the information necessary to draft an addendum report, and that said addendum report
can be included on the agenda of the Planning Committee meeting scheduled for 28
April 2026. The site visit to Mavisbank House will be held on 27 April 2026.
Page 4 of 118

Page 5

5. Reports and Items for Discussion
Report
No.
Report Title Presented by:
5.1 Planning Committee Site Visit Procedures
Head of Placemaking
and Chief Planning
Officer
The Head of Placemaking and Chief Planning Officer presented the report.
The purpose of this report is to provide the Committee with clarification regarding
the Planning Committee site visit procedures, in particular the need to attend a
requested site visit to participate in the debate and determination of the associated
planning application. The recommendations on the report are based on latest best
practice that Elected Members should have all information available to determine
an application, including a site visit. As such, those Planning Committee Members
who have not undertaken the visit are disadvantaged and may not take part in the
determination of the report.
Planning Committee Members acknowledged the site visits can be highly valuable
but argued that some Committee Members would already be familiar with the sites
through their role as Ward Councillors. Furthermore, Planning Committee
Members voiced concerns that the wording in the report could raise speculation
on the current practice, and that some sites could pose accessibility issues that
would preclude an Elected Member with mobility issues from attending a site with
limited accessibility. Planning Committee Members also noted that if all Elected
Members are required to attend the site visit it would be necessary to procure a
larger bus. The Head of Placemaking and Chief Planning Officer agreed to review
arrangements to ensure site visits are fully accessible. By and large, most sites
can be made accessible, and if Planning Committee Members raise concerns
about accessibility of a certain site, these concerns can be addressed as they
arise.
Planning Committee Members unanimously agreed that the arrangement that
dispensed with the need to attend site visits during the Covid period continues to
work well and there is no indication it should be reversed. However, they asked
that if a call-in form is submitted by an Elected Member, it should be expected that
Planning Committee Members make every effort to visit that site out of respect for
the colleague that submitted the call-in.
The Head of Placemaking and Chief Planning Officer advised that the purpose of
the report was to clarify if there is a legal requirement to attend site visits as there
appeared to be some confusion on the matter at the last Planning Committee
meeting. As there is agreement among Planning Committee Members that it is
not a requirement to attend a visit this will be noted for future reference.
Planning Committee Members pointed out that other Local Authorities have
different practices in terms of extending Planning Committee membership to all
Page 5 of 118

Page 6

Elected Members and queried whether there are also different practices in terms
of the requirement of Planning Committee Members to attend the site visit.  The
Head of Placemaking and Chief Planning Officer advised that they are not aware
of any Local Authorities which make attendance to site visits mandatory for
Planning Committee Members and added that there is no legal requirement
requiring this either. It was also noted Midlothian Council’s decision that site visit
attendance should be mandatory to determine a Local Review Body application
was in response to Government good practice guidance.
Further discussion ensued on the matter of using drones to allow Planning
Committee Members to view a site remotely. As well as improving accessibility,
drone use will allow Planning Committee Members to attend site visits which they
would otherwise not be able to attend due to prior commitments. The Chair noted
drone use was considered by the Planning Committee in the past, but there were
obstacles linked to licensing and technology and issues connected to Covid
restrictions. When the Covid restrictions were lifted the introduction of drones was
not given further consideration, but it may be worthwhile to reconsider their use.
Planning Committee Members agreed with this and suggested the cost of drone
hire or purchase is built into the fees and structures aspect of the Midlothian Local
Development Plan 2 (MLDP2) to ensure bigger developers pay a larger
contribution towards this expense. The Chair advised that in the past it was
customary practice for Developers to submit a 3D model of a housing
development to Councils. As this practice has been abandoned, it may be
possible to substitute this by an Artificial Intelligence (AI) rendering of the
development or any other resource that is more tangible than 2D images.
Councillor McManus moved to incorporate the recommendations made by
Planning Committee Members to ensure site visits remain accessible and that
drone use is considered to facilitate site visits. The Chair seconded the motion.
Decision
Planning Committee noted the contents of the report but did not endorse the
recommendation that Elected Members must attend a scheduled site visit to
participate in the determination of the associated planning applications.
Planning Committee Members moved to incorporate the recommendations made
by Planning Committee Members to ensure site visits remain accessible and that
drone use is considered to facilitate site visits.
Action
Head of Placemaking and Chief Planning Officer to incorporate the
recommendations made by Planning Committee Members to ensure site visits
remain accessible and that drone use is considered to facilitate site visits
Report
No.
Report Title Presented by:
5.2 Planning Enforcement Update Head of Placemaking and
Chief Planning Officer
The Head of Placemaking and Chief Planning Officer presented the report, the
purpose of this report is to provide the Planning Committee with an update on
Page 6 of 118

Page 7

those enforcement cases that have been reported to the Planning Committee as
requested at its meeting of 20 January 2026. The report provides an overview of
the legislation, government guidance, and the Council’s process regarding
planning enforcement.
Table 1 in the report sets out detail of enforcement cases reported to the
Planning Committee since May 2022 including the up-to-date position for each
case. Section 4 in the report sets out the number of enforcement cases closed,
and number of enforcement notices issued. It is recommended that the
Committee note the Planning Enforcement update.
The Chair thanked the Head of Placemaking and Chief Planning Officer for the
report and invited discussion from the Planning Committee Members, adding that
it would be desirable to reduce the time between taking enforcement action and
a trial taking place. The Head of Placemaking and Chief Planning Officer advised
that they consider what is within the Council’s powers to reduce the waiting but
acknowledged that options may be limited. The backlog in the Court system may
explain some of the delays experienced, and an additional complication is that
for some breaches of planning control it is necessary to prosecute within six
months of an offence.
Planning Committee Members also noted other breaches that do not qualify for
inclusion in the report, such as companies advertising in covert ways near
roundabouts, which is in breach of legislation and affecting those advertisers that
pay applicable fees. The Head of Placemaking and Chief Planning Officer
agreed with the need to tackle this between the Council and the road authority.
Further discussion ensued on the matter of fines levied by the Court, and
whether the Council can draw revenue or obtain reimbursement of legal costs.
The Head of Placemaking and Chief Planning Officer advised the Local Authority
can ask to recover any legal costs incurred, and as concerns the fines, these do
not get paid to the Local Authority. In any event, the goal of fines should be to
deter breaches of planning control rather than profit from them. Planning
Committee Members also queried whether the Council has any means to verify
whether a fine has been paid, and to chase this in case it has not. The Head of
Placemaking and Chief Planning Officer advised in the event the Courts impose
a fine, then the Courts themselves can seek to recover this money through debt
arrears services. Alternatively, if it is the Council that levies a fixed penalty, there
is the means to chase this payment through the in-house debt recovery team.
For breaches of planning control, it would also be possible to log this in the land
holdings so it comes up in the event the owner attempts to sell in future, and the
Council can recover the money through the sale.
The Head of Primary Care and Older People's Services joined the meeting
at 13.25pm
Councillor Pottinger joined the meeting at 13.25 pm.
Planning Committee Members noted page 21 in the report states there are no
time limits for enforcement action in terms of a listed building and queried
Page 7 of 118

Page 8

whether any time limit apply for planning breaches on a non-listed building. The
Head of Placemaking and Chief Planning Officer clarified non-listed buildings
have a time bar, which can span from 4 to 10 years depending on whether it is
for operational works or for condition or change of use. The Head of Placemaking
and Chief Planning Officer also clarified that after issuing an enforcement the
time bar is frozen, even if there is a delay in the legal system. Once an
enforcement notice is issued, it becomes a criminal offence not to comply. The
Head of Placemaking and Chief Planning Officer advised planning regulations
are complex and there are some exceptions of note, such as works to trees
subject to a Tree Preservation Order (TPO). 
Decision
The Planning Committee noted the contents of the report.
Report
No.
Report Title Presented by:
5.3 Tree Preservation Order Confirmation Report –
Pomathorn Mill, Penicuik
Head of Placemaking
and Chief Planning
Officer
The Head of Placemaking and Chief Planning Officer presented the report for
decision. This report seeks the Committee’s approval to confirm a Tree
Preservation Order (TPO) issued on 27 October 2025 regarding an area of
woodland at land at Pomathorn Mill, Penicuik.
The TPO was issued to protect a group of trees on grounds of amenity,
biodiversity, and development screening. The TPO will continue for a period of 6
months or until confirmed, which will make the TPO permanent. The TPO is
initially temporary to allow for consultation, and during this temporary period the
trees are protected. Two representations were received during the consultation,
which are included in the report. Planning Committee Members also attended a
site visit for this location.
It is recommended that the Planning Committee:
a) Confirm the Tree Preservation Order (1 of 2025) for an area of woodland at
Pomathorn Mill, Penicuik; and
b) Instruct the Head of Placemaking to carry out the necessary procedures,
following confirmation and endorsement of a tree preservation order, which are
required by the Town and Country Planning (Scotland) Act 1997, as amended
by the Planning etc. (Scotland) Act 2006 and the Town and Country Planning
(Tree Preservation Order and Trees in Conservation Areas) (Scotland)
Regulations 2010.
The Chair thanked the Head of Placemaking and Chief Planning Officer for the
report and invited discussion from the Planning Committee Members.
Planning Committee Members asked for clarification of what constitutes an
ancient woodland. The Head of Placemaking and Chief Planning Officer clarified
National Planning Framework 4 (NFP4) describes ancient woodland as land that
Page 8 of 118

Page 9

has been continuously wooded since at least 1750. NFP4 sees ancient
woodlands and veteran trees as irreplaceable, requiring high-level protection
from adverse development impacts. Planning Committee Members advised
trees, even if not qualifying as ancient woodland, are still valuable from the point
of view of biodiversity.
Councillor Smaill noted that this situation was the result of the landowner cutting
trees, some of which would not qualify as ancient woodland. Councillor Smaill
wondered if it may be possible to identify the ancient woodland, and those trees
that protect the view and should be preserved, without constraining other areas
that may prevent the Council freedom of action for the site in the future. The
Head of Placemaking and Chief Planning Officer advised it is possible to modify
the terms of the TPO and clarified the areas that had been affected by the site
owner cutting trees. It was also confirmed that the TPO was sought after the
owner was reported to be cutting trees without the appropriate felling license.
Councillor Cassidy acknowledged the point made by Councillor Smaill but
pointed out that this could result in ambiguity that may be used by other site
owners to cut trees indiscriminately. Councillor Cassidy stressed that every tree
performs a function and the Planning Committee should send the message that
this behaviour will not be tolerated. Councillor Cassidy moved to approve the
recommendation in the report.  Councillor Parry seconded Councillor Cassidy’s
motion, adding that the Council should retain and exercise control on this area. 
Councillor Smaill queried whether putting a TPO over such a large area is a
proportionate response to the number of trees removed and moved to make an
opposing motion. However as there was no seconder the motion fell, and the
decision of the Planning Committee was to uphold the recommendation in the
report. Councillor Smaill asked that his dissent with the decision is noted.
Decision
Planning Committee agreed with the recommendations of the report
Report
No.
Report Title Presented by:
5.4
25/00362/PPP – Former Arniston Gas
Works, Gorebridge Appeal Decision, report
by Chief Officer Place
Head of Placemaking
and Chief Planning
Officer
The Head of Placemaking and Chief Planning Officer presented the report for
noting.  The purpose of this report is to advise the Planning Committee of a
planning application appeal decision with regard an application (25/00362/PPP)
for Planning Permission in Principle for the erection of 14 dwellinghouses at the
Former Arniston Gas Works, Gorebridge. The Scottish Ministers upheld the
recommendation of the Planning Committee to refuse Planning Permission.
It is recommended that the Committee notes the planning application appeal
decision regarding an application for planning permission in principle for the
erection of 14 dwellinghouses at the Former Arniston Gas Works,
Page 9 of 118

Page 10

Decision
The Planning Committee noted the outcome of the planning appeal.
Report
No.
Report Title Presented by:
5.5
25/00683/PAC – Land at Dalkeith Country
Park, Dalkeith Pre Application Consultation,
report by Chief Officer Place
Head of Placemaking
and Chief Planning
Officer
The Head of Placemaking and Chief Planning Officer presented the report. The
purpose of this report is to advise the Committee of the submission of a Proposal
of Application Notice (PAN) and corresponding pre-application consultation for a
holiday accommodation development including communal facilities, formation of
access, landscaping, and associated works on land at Dalkeith Country Park,
Dalkeith.
The purpose of the report is to allow Elected Members to express a provisional
view on the proposed major development at an early stage of the planning
process. The applicants will engage in public consultation, including two public
drop-in sessions. The site is within protected landscape and green belt however
Dalkeith Country Park is host to visitor facilities and as such there is scope for
tourist accommodation if it relates to the existing use of the site.  Further
consideration will be given to design matters in paragraph 3.8 of the report. The
report outlines a provisional planning consideration regarding the development
plan and material consideration, but it is worth noting this is based on indicative
information available at present. A detailed assessment will be made if a plan
and application is forthcoming. The applicant could submit a planning application
once the public consultation has been concluded.
It is recommended that the Committee notes:
a) the provisional planning position set out in this report;
b) that any comments made by Members will form part of the minute of the
Committee meeting; and
c) that the expression of a provisional view does not fetter the Committee in its
consideration of any subsequent formal planning application.
The Chair thanked the Head of Placemaking and Chief Planning Officer for the
report and invited discussion from the Planning Committee Members.
Councillor Cassidy expressed reservations about the Pre-Application Notice,
noting the developers are the same company that lodged a section 36 consent
for the building of a Battery Energy Storage System (BESS) at Salters’ Park, and
which is 300 metres from the site identified in the PAN.
Planning Committee Members discussed how the proposed development would
affect traffic. The Head of Placemaking and Chief Planning Officer noted this
PAN is a revised application, as a bigger scheme that was the subject of a
separate PAN did not come to fruition. However, this development is for 100 units
Page 10 of 118

Page 11

which is still a significant development so Planning Committee Members queried
whether this would result in a disruption to the road network. Another point raised
by Planning Committee Members was the fact the direct route used by park users
and dog walkers in Dalkeith Country Park would run through the area identified
in the PAN and wondered if there was any way in which the impact would be
mitigated. The Head of Placemaking and Chief Planning Officer advised
disruption to road and pedestrian traffic would be considered as part of the
detailed scheme.
The Chair advised all points raised by Planning Committee Members would be
considered by the Head of Placemaking and Chief Planning Officer if a planning
application is submitted.
Decision
The Planning Committee noted the Pre-Application Notice.
6. Private Reports
No items for discussion.
7. Date of next meeting
The meeting concluded at 13.47 pm.
The next meeting will be held on Tuesday 28 April 2026 at 14.00pm (MS Teams
only). The Planning Site Visit will be held on Monday 27 April 2026 at 10.00am.
Page 11 of 118

Page 12

Page 12 of 118

Page 13

Planning Action Log
Planning Committee
Tuesday 28 April 2026
Item No 4.2
No Date of
Meeting
Item No and Title Action Action
Owner
Plann
ing 
Paper
Expe
cted
Date
Council Paper
Expected Date
Comments
1 20 January
2026
Non-Compliance with
the Requirement of an
Enforcement Notice and
Associated Prosecution
Regarding Change of
Use of Land to a
Builder's Yard, Sitting of
Shipping Containers
and Associated
Engineering Operations
to Form Hardstanding
at Land North of 6
Ashbank, Gorebridge
Planning Department to
write to owner to
explain the Planning
Committee’s decision to
refer the case to the
COPFS for
consideration of
prosecutorial action
pursuant to section 136
of the Town and
Country Planning
(Scotland) Act 1997.
Head of Placemaking
and Chief Planning
Officer to inquire if fine
has been paid or any
other recovery actions
Head of
Placemakin
g/ Chief
Planning
Officer
N/A N/A Recommended for
Closure
Completed- Report
presented to Planning
Meeting on 9 March 2026
Page 13 of 118

Page 14

No Date of
Meeting
Item No and Title Action Action
Owner
Plann
ing 
Paper
Expe
cted
Date
Council Paper
Expected Date
Comments
are being considered
and notify the Planning
Committee.
2 20 January
2026
25/00306/DPP
Application for planning
permission for formation
of access road, erection
of retaining wall and
fence and associated
works at Mavisbank
Estate, Loanhead
Head of Placemaking
and Chief Planning
Officer to provide a
supplementary
addendum to the report
Planning Committee
Members to undertake a
site visit to Mavisbank
House and the site of the
proposed access route.
Head of
Placemakin
g and Chief
Planning
Officer
Planning
Committee
Members
28
April 
2026
N/A Addendum to explore other
alternatives available to the
proposal and whether
enough has been done to
find an appropriate solution
to the issues
The additional information
requested will be
presented to the April
Committee and a site visit
will be arranged in
advance of that meeting.
3 9 March 2026 Planning Committee
Site Visit Procedures
Head of Placemaking
and Chief Planning
Officer to incorporate
recommendations made
by Planning Committee
Head of
Placemakin
g and Chief
Planning
Officer
TBC Drone images of ‘major’
development sites
allocated in the MLDP2
should be requested from
Page 14 of 118

Page 15

No Date of
Meeting
Item No and Title Action Action
Owner
Plann
ing 
Paper
Expe
cted
Date
Council Paper
Expected Date
Comments
Members to ensure visits
remain accessible.
Head of Placemaking to
investigate the possibility
of using drones to
facilitate site visits
applicants when submitting
planning applications.
4 23 March 2026 LRB Matters Arising Provide a paper to a
future Planning
Committee to update
Elected Members on the
Council’s position in
terms of operational
matters regarding Electric
Vehicle Charging.
Head of
Placemakin
g and Chief
Planning
Officer
8 June
2026
A report will be
presented to
Planning
Committee
Page 15 of 118

Page 16

Page 16 of 118

Page 17

PLANNING COMMITTEE
TUESDAY 28 APRIL 2026
ITEM NO 5.1 
PRE-APPLICATION REPORT REGARDING THE ERECTION OF TENNIS AND
PADEL CENTRE WITH ANCILLARY FACILITIES (INCLUDING CAFE/BAR,
GYM AND RETAIL) AT WHITEHILLS, WHITEHILL ROAD, MILLERHILL,
DALKEITH (26/00189/PAC)
Report by Chief Officer Place
1 PURPOSE OF REPORT
1.1 The purpose of this report is to advise the Committee of the submission
of a Proposal of Application Notice (PAN) and corresponding
preapplication consultation for the erection of tennis and padel centre
with ancillary facilities (including cafe/bar, gym and retail) at Whitehills,
Whitehills Road, Millerhill, Dalkeith. 
1.2 The pre-application consultation is reported to Committee to enable
Councillors to express a provisional view on the proposed major
development. The report outlines the proposal, identifies the key
development plan policies and material considerations and states a
provisional, without prejudice, planning view regarding the principle of
development. 
2 BACKGROUND
2.1 Guidance on the role of Councillors in the pre-application process
published by the Commissioner for Ethical Standards in Public Life in
Scotland, was reported to the Committee at its meeting of 30 August
2022. The guidance clarifies the position regarding Councillors stating
a provisional view on proposals at pre-application stage.
2.2 A Proposal of Application Notice (PAN) detailing the pre-application
consultation for the development of a tennis and padel centre with
ancillary facilities, including a café/ bar, gym and retail, was submitted
on 24 March 2026. The applicant is Amy Lansdown and Artemis Sport
Limited. 
2.3 As part of the pre-application consultation process two public events
are to be held. The first event is to be held at the Danderhall
Community Hub on Wednesday 22 April 2026 between 16.00-19.30.
The second event it to be held at Queen Margret University on
Thursday 21 May 2026 between 16.00-19.30. The applicant has
confirmed that the events will be advertised at least seven days
prior to them taking place within the Midlothian Advertiser.  
Page 17 of 118

Page 18

2.4 An applicant must wait 12 weeks from the date of submission of a PAN
before submitting a planning application. The earliest date that the
application could be submitted is the 17 June 2026 subject to the
consultation having been completed by that date. The subsequent
planning application must be accompanied by a Pre-application
Consultation Report detailing the consultation undertaken, a summary
of written responses and views expressed at the public events, and
explanation of how members of the public were given feedback on the
applicant’s consideration of their views. 
2.5  A copy of the pre application notice has been sent by the applicant to
Danderhall and District Community Council and Musselburgh and
Inveresk Community Council. A copy has not been able to be sent to
Craigmillar Community Council as there is not an active community
council in place.
2.6  A copy has also been sent to Colin Beattie MSP, Kirsty McNeil MP,
and local ward councillors in Midlothian, East Lothian and the City of
Edinburgh. The applicant’s agent has also confirmed that a copy has
been sent to the planning departments of the City of Edinburgh Council
and East Lothian Council due to the proximity of the site to the local
authority boundaries. 
2.7  It is reasonable for an Elected Member to attend one of the events
without a Council planning officer present, but the Member should (in
accordance with the Commissioner’s guidance reported to the
Committee at its meeting in August 2022) not offer views, as the forum
for doing so will be at meetings of the Planning Committee.
3 PLANNING CONSIDERATIONS
3.1 In assessing any subsequent planning application, the main planning
issue to be considered in determining the application is whether the
proposed development complies with development plan policies unless
material planning considerations indicate otherwise. The views of
consultees and representors will be material considerations in the
assessment of an application for the proposed development.
3.2 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan 2017 (MLDP).
Section 24(3) of the Town and Country Planning (Scotland) Act 1997
states that where there is an incompatibility between the provisions of
the National Planning Framework and the provisions of a local
development plan whichever of them is the later in date is to prevail. At
present this means that where there is an incompatibility, NPF4 takes
precedence. This will change when a new local development plan is
adopted.
Page 18 of 118

Page 19

3.3 The application site measures approximately 2.9 hectares and is
situated to northeast of the Midlothian Council administrative area, in
close proximity to its boundaries with East Lothian and the City of
Edinburgh. The site is located to the south of Fort Kinnaird/
Newcraighall and southwest of the A1 arterial road. 
3.4 The site comprises the southeastern part of the site known as
Whitehills, which is identified in the MLDP as allocation e26
(established economic land supply) and has planning permission in
principle for Use Class 4- Business Use; Use Class 5- General
Industry; Use Class 6- Storage and Distribution; Sui Generis- Home
Improvement Showrooms/ Warehousing; Sui Generis- Builders
Merchant; and Sui Generis- Car Showroom (application ref.
19/00748/PPP). 
3.5 The site is broadly rectangular in shape and is bound by a rail line (The
Waverly/Borders Line) to the east and A1 beyond. To the north and
west the site is bound by land within the wider Whitehills development
site. Beyond this to the north is the Fort Kinnaird retail park. To the
south, the site is bound by Whitehill Road and residential properties at
Whitehill Mains. Beyond this is the Recycling and Energy Recovery
Centre (energy from waste facility) and the Millerhill Marshalling Yards.
3.6 The site is currently undergoing remediation, infrastructure and
platforming works approved by various matters specified in conditions
(MSC) applications pursuant to 19/00748/PPP.  These works comprise
levelling works, the delivery of a central spine road through the site and
providing access from Whitehill Road and sustainable urban drainage
system (SUDS) basins at the northern boundary. Once completed, the
spine road would bound the site to the west and is where access would
be taken from. 
3.7 The relevant policies of the National Planning Framework 4 (NPF4)
are:
• Policy 1 Tackling the climate and nature crises
• Policy 2 Climate mitigation and adaptation
• Policy 3 Biodiversity
• Policy 4 Natural Places
• Policy 5 Soils
• Policy 6 Forestry, woodland and trees
• Policy 7 Historic assets and places
• Policy 9 Brownfield, vacant and derelict land and empty buildings
• Policy 11 Energy
• Policy 12 Zero Waste
• Policy 13 Sustainable Transport
• Policy 14 Design, quality and place
• Policy 15 Local Living and 20-minute neighbourhoods
• Policy 18 Infrastructure first
Page 19 of 118

Page 20

• Policy 19 Heat and cooling
• Policy 20 Blue and green infrastructure
• Policy 22 Flood risk and water management
• Policy 21 Play, recreation and sport
• Policy 23 Health and Safety
• Policy 24 Digital Infrastructure
• Policy 25 Community Wealth Building
• Policy 26 Business and Industry
• Policy 27 City, town and commercial centres
• Policy 28 Retail
3.8 The relevant policies of the Midlothian Local Development Plan (2017)
are:
• Policy STRAT1: Committed Development
• Policy STRAT5: Strategic Employment Allocations
• Policy DEV2: Protecting Amenity within the Built-Up Area
• Policy DEV5: Sustainability in New Development
• Policy DEV6: Layout and Design of New Development
• Policy DEV7: Landscaping in New Development
• Policy DEV10: Outdoor Sports Facilities
• Policy ECON1: Existing Employment Locations
• Policy TRAN1: Sustainable Travel
• Policy STRAT2: Transport Network Interventions
• Policy TRAN5: Electric Vehicle Charging
• Policy IT1: Digital Infrastructure
• Policy ENV7: Landscape Character
• Policy ENV9: Flooding
• Policy ENV10: Water Environment
• Policy ENV11: Woodland, Trees and Hedges
• Policy ENV15: Species and Habitat Protection and Enhancement
• Policy ENV16: Vacant, Derelict and Contaminated Land
• Policy ENV17: Air Quality
• Policy ENV18: Noise
• Policy ENV25: Site Assessment, Evaluation and Recording
• Policy IMP1: New Development
• Policy IMP2: Essential Infrastructure Required to Enable New
Development to Take Place
• Policy IMP3: Water and Drainage
3.9 The site is identified in the MLDP as comprising part of the Council’s
established economic land supply (site e26). While the MLDP identifies
the site for business and general industry uses, planning permission in
principle has previously been granted for a wider range of uses
including Class 6 Storage and Distribution; Sui Generis- Home
Improvement Showrooms/ Warehousing; Sui Generis- Builders
Merchant; and Sui Generis- Car Showroom. The proposed
development of a tennis and padel center does not fall into the
established uses for the site and therefore a detailed planning
application will be required. 
Page 20 of 118

Page 21

established uses for the site and therefore a detailed planning
application will be required. 
3.10 MLDP Policy STRAT1 confirms there is a presumption in favour of
committed development sites which includes Whitehills as a site within
the economic land supply. Policy ECON1 establishes that economic
development will be supported where it contributes to a suitable
employment density, is compatible with neighbouring uses and would
not have a detrimental impact on amenity. Non-business uses will not
be supported on allocated economic sites. The loss of an economic site
in productive use to a non-employment generating use will only be
permitted if there is no net detriment to the overall supply of economic
land. NPF4 Policy 26 states that other employment uses will be
supported in primary business areas where they do not prejudice the
primary function and are compatible with the business/ industrial
character. 
3.11 The proposed development would comprise a Class 11 Assembly and
Leisure use which is not a traditional employment use supported by
Policy ECON1. As such, a future application would need demonstrate
that the site would generate employment, would be compatible with the
wider Whitehill site and permitted uses, and would not result in a net
detriment to the supply of economic land. 
3.12 NPF4 does provide support for this type of use through Policy 21 Play,
recreation and sport, and Policy 25 Community wealth building.  
3.13 While there could be support for the principle of development on the
site subject to demonstrating the above, detailed consideration will also
have to be given to design matters, in particular the site layout, the
siting, design and appearance of buildings and other structures, the
materials used, landscaping, open space, parking, biodiversity and
sustainability, in order to ensure compliance with sustainable place-
making policies within the MLDP and NPF4. It will also be necessary to
give careful consideration to transport and active travel arrangements.
4 PROCEDURES
4.1 The Scottish Government’s Guidance on the Role of Councillors in Pre-
Application Procedures provides for Councillors to express a ‘without
prejudice’ view and to identify material considerations regarding a
major application.
4.2 The Committee is invited to express a ‘without prejudice’ view and to
raise any material considerations which they wish the applicant and/or
officers to consider. Views and comments expressed by the Committee
will be entered into the minutes of the meeting and relayed to the
applicant for consideration. 
4.3 The Scottish Government’s Guidance on the Role of Councillors in Pre-
Application Procedures advises that Councillors be expected to
Page 21 of 118

Page 22

approach their decision-making with an open mind in that they must
have regard to all material considerations and be prepared to change
their views that they are minded towards if persuaded that they should.
5 RECOMMENDATION 
5.1 It is recommended that the Committee notes:
a) the provisional planning position set out in this report;
b) that any comments made by Members will form part of the minute of
the Committee meeting; and
c) that the of expression of a provisional view does not fetter the
Committee in its consideration of any subsequent formal planning
application.
Peter Arnsdorf
Planning, Sustainable Growth and Investment Manager
Date: 17 April 2026
Application No:  26/00189/PAC
Applicant:  Amy Lansdown and Artemis Sport Limited
Agent:         Lichfields 
Validation Date: 24 March 2026
Contact Person: Eilidh Paul, Planning Officer
Email: eilidh.paul@midlothian.gov.uk  
Attached Plans:  Location Plan
Page 22 of 118

Page 23

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2026)
Proposal of application notice for erection of tennis
and padel centre with ancillary facilities, access, car
and cycle parking, landscape, associated
infrastructure and works.
Whitehills, Whitehill Road, Millerhill, Dalkeith.
File No. 26/00189/PAC
Scale 1:5000Page 23 of 118

Page 24

Page 24 of 118

Page 25

PLANNING COMMITTEE
TUESDAY 28 APRIL 2026
ITEM NO 5.2
APPLICATION FOR PLANNING PERMISSION 25/00306/DPP FOR
FORMATION OF ACCESS ROAD; ERECTION OF RETAINING WALL AND
FENCE AND ASSOCIATED WORKS AT MAVISBANK ESTATE,
LASSWADE ROAD, LOANHEAD  
Report by Chief Officer Place
1. SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1. The application is for the formation of access road; erection of
retaining wall and fence and associated works at Mavisbank
Estate, Lasswade Road, Loanhead. 
1.2. This application was presented to the Committee at its meeting of
20 January 2026 at which the Committee deferred the application
for a site visit and to secure the following information:
• Details of the alternative access options including details of
negotiations between the applicant, the Council and
landowners;
• Details of the community engagement undertaken; and,
• Details of traffic management to manage the mix of
construction traffic and walkers/other users.
The applicant has submitted the additional information requested
and it is attached to this report.
1.3. There have been an additional 10 representations received since
the application was originally presented to the Committee; nine
objections (from seven separate households) and one in support. 
A further objection consultation response was received from
Loanhead and District Community Council (LDCC).  In total there
have been 17 representations (15 objections and two support) and
consultation responses from Historic Environment Scotland,
Scottish Water, The Council’s Ecological Advisor (TWIC), the
Council’s Archaeological Advisor (ELAS), the Loanhead and
District Community Council, the Council’s Senior Manager
Neighbourhood Services (Roads) and the Council’s Land
Resource Manager.
1.4. Arrangements are in place for Committee to undertake a site visit
on 27 April 2026.
Page 25 of 118

Page 26

1.5. The relevant development plan policies are policies 1, 2, 3, 5, 6, 7,
8, 13, 18, 20, 22 and 23 of National Planning Framework 4 (NPF4)
and policies ENV1, ENV6, ENV7, ENV9, ENV10, ENV11, ENV14,
ENV15, ENV19, ENV20, ENV23, ENV24, ENV25, TRAN1, IMP2 and
IMP3 of the Midlothian Local Development Plan (MLDP). 
1.6. The recommendation is to grant planning permission subject to
conditions.
2. LOCATION AND SITE DESCRIPTION
2.1. The application site comprises a largely narrow strip of land measuring
1.78 hectares in area and is dog-legged in shape, running in a south
easterly direction from the boundary at Wadingburn Road before then
turning southwest and winding down to the category A listed
Mavisbank House. The application site crosses over agricultural land
and open parkland that is covered by shrubs, trees and rough grass. 
Mavisbank House does not form part of the application site itself but a
roughly square area of land to the front of the house terminates the
westernmost extent of the application site.
2.2. The application site is located within the greenbelt, Mavisbank
Conservation Area, a special landscape area and a nationally
important designed landscape as defined by the Midlothian Local
Development Plan. 
3. PROPOSAL
3.1. Planning permission is sought for the formation of a vehicle access
road and the erection of a retaining wall and fence and other
associated works to enable access to Mavisbank House to facilitate
rehabilitation works.  The Mavisbank House phase one works relate to
the recently approved stabilisation and repair work of the ruined house;
including rebuilding of internal walls and chimneys; formation of a door
opening, installation of steel frame and security mesh windows;
installation of fencing, temporary steps and ramp and other associated
works.  The submitted Planning Statement notes that the Landmark
Trust are seeking to come forward with phase two works which will
comprise of the re-roofing and restoration of the house for the use as a
holiday let and community use with educational initiatives.  The phase
two works do not form a part of the current application nor are there
any current applications pending consideration for this second phase of
the works.
3.2. The proposed access drive will extend approximately 850metres,
running southeast from the boundary of the agricultural field at
Wadingburn Road along the line of an existing field boundary before
continuing southwest and terminating at Mavisbank House. The access
drive will be 3.5 metres wide with a total of six passing bays included
along the route. The access drive is to be surfaced in Ulticolour in ‘Buff
Page 26 of 118

Page 27

Quartzite’, which is a buff/natural coloured porous tarmac.  A field gate
is to be installed with a 50m set back from Wadingburn Road to restrict
vehicle access. 
3.3. The proposals include a retaining wall which comprises of an
approximately 8.27m length of ‘Flex MSE vegetated retaining wall’ to
the western side of the proposed access drive approximately 135m
from Wadingburn Road.  This walling material is mechanically
stabilised earth and is an alternative to concrete or gabion baskets.
3.4. The proposals include filter drains running alongside the access drive
and swales to manage any surface water runoff towards the existing
Scottish Water outflow. 
3.5. In terms of tree removal and landscaping, the proposals require the
removal of approximately 86 trees of varying size and health and
proposes for compensatory planting of 90 trees of equivalent tree
species to those being removed.  Additional planting and landscaping
is proposed along the access drive route. 
3.6. The applicant has confirmed that there will be no significant road
closures proposed during construction. There may be some local traffic
management to enable the initial works to formalise the access taken
from Wadingburn Road. 
3.7. The application is accompanied by:
• Planning Supporting Statement
• Bat Survey
• Coal Mining Risk Assessment
• Ecology Survey
• Ecological Survey Report Appendices
• Heritage Statement
• Tree Removal Statement
• Tree Survey Part 1 and 2
• Supporting Statement - Applicant’s Response to Planning
Committee (attached as an Appendix A)
• Supporting Statement – Additional Details of Community
Engagement (attached as an Appendix B)
4. BACKGROUND
4.1. Associated listed building consent (25/00307/LBC) and planning
permission (25/00311/DPP) were granted in December 2025 for the
stabilisation and repair work of Mavisbank House; including rebuilding
of internal walls and chimneys; formation of door opening, installation
of steel frame and security mesh windows; installation of fencing,
interpretation boards, temporary steps and ramp and associated works.
4.2. The planning application is subject to an objection from Loanhead and
District Community Council which provided the opportunity for local
Page 27 of 118

Page 28

elected members to ‘call in’ the application for consideration by the
Planning Committee. Councillor Winchester ‘called in’ the application to
be given further scrutiny by the Planning Committee. 
4.3. This planning application was previously reported to Committee on 20
January 2026. The Committee decided to defer the decision until a site
visit had been carried out and further information was received from the
applicant.
5. CONSULTATIONS
5.1. Historic Environment Scotland does not object to the application but
advised that the proposed access drive would have significant physical
and visual impacts on the Mavisbank Inventory site (the designed
landscape), and it would be more impactful than the previously
discussed routes.  Historic Environment Scotland noted that the
previously proposed access route reused almost the full length of the
historic East Drive.  They state that the current proposal would cut
down the valley side halfway along the drive, which would introduce a
significant new element into a sensitive part of the designed landscape.
Furthermore, Historic Environment Scotland advised that the access
drive will result in a breach in the edge of the valley escarpment,
creating the only break in the currently unbroken valley edge, which is
a distinctive feature of the designed landscape. This would be visible in
views, especially across the valley from the south. Taking the new
access drive down into the valley at one of the steepest parts of the
valley side would result in significant amounts of cut and fill, as well as
the removal of 86 trees.
5.2. Historic Environment Scotland noted that the proposed access drive is
to be located to the east of The Knowe, an important landform and
planted element of the designated designed landscape.  Historic
Environment Scotland also noted that whilst the access drive would be
visible in longer views across the valley from the south, it will not have
a significant adverse impact on key views from and towards Mavisbank
House, as well as views from the ‘Roman Station’ landform behind the
house. Whilst the arboricultural report shows that 86 trees would be
removed, the removals have been kept to a minimum. All veteran trees
would be retained, and root protection areas identified along the route
where necessary.
5.3. It is noted that, as well as negative impacts, the proposed development
would provide elements which would enhance both the inventory site
and the setting of Mavisbank House, including the proposed removal of
vegetation from the forecourt of the house to reopen up important
views, as well as the removal of a block of mature sitka spruce which
currently block views. Furthermore, the proposed access drive would
facilitate phase one works to the house which is crucial to allow the
conservation, repair and reuse of the important category A listed
Mavisbank House, which forms the focal point of this designed
landscape.
Page 28 of 118

Page 29

5.4. Overall, Historic Environment Scotland weighed up the negative
impacts on the inventory site against the positive conservation benefits
to both the house and its designed landscape.  They concluded that
the proposed development is only acceptable because it is a crucial
first step to allow the conservation and restoration of these
internationally important heritage assets. Without that conservation
benefit, the impacts would be unacceptable.
5.5. Scottish Water does not object to the application, but that this does
not mean that the proposed development can automatically be
serviced.
5.6. The Council’s Ecological Advisor – The Wildlife Information Centre
(TWIC) does not object to the application.  TWIC initially provided
feedback on the Ecological Survey Report and confidential Badger
annexe dated 21 March 2025 and were generally satisfied that the
report was sufficiently thorough to support the conclusions and
recommendations provided.  TWIC did request that the report was
updated to reflect the access route that was subject of the current
planning application to fully consider the impact.  The applicant
arranged for a revised Ecological Survey Report and confidential annex
to be submitted.  TWIC provided an updated response on the
Ecological Survey Report and confidential annex.  TWIC noted that
recommendations have been added regarding woodland/hedgerow
planting to compensate for loss of woodland/scrub/hedgerow as part of
proposed works, however, planned works include the removal of a
section of the long-established woodland (of plantation origin), which is
listed on the ancient woodland inventory.  TWIC are of the view that the
loss of ancient woodland habitat should be avoided as new planting
cannot compensate for its loss. TWIC confirmed that the previous
comments relating to other matters and findings were still relevant.
Should planning permission be granted then the recommendations
within the Ecological Survey Report and confidential annex can be
secured via use of condition.
5.7. The Council’s Archaeology Advisor – East Lothian Archaeology
Service (ELAS) does not object to the application but noted that whilst
there is going to be an impact in forming the new access it is not one
that would outweigh the benefits in relation to enabling the
conservation of Mavisbank House.  However, it is noted that the
resultant development is likely to result in the potential disturbance and
change to the character of the historic designed landscape, along with
the potential disturbance/loss of buried archaeological remains.  As a
result, a planning condition should be attached to any grant of planning
permission to secure a programme of archaeological works, including
survey and recording and archaeological monitoring.
Page 29 of 118

Page 30

5.8. The Loanhead and District Community Council (LDCC) welcomed
the proposals to save Mavisbank House and improve public access
and noted that the site is located within LDCC’s only conservation area.
They request that all/any development complies with the Mavisbank
Conservation Area Character Appraisal and Management Plan.  LDCC
noted that whilst the proposals will improve public access they will also
result in the exposure of the conservation area to the potential increase
in littering, BBQ’s, campfires, late night noise and wild comping which
will all have a detrimental effect on the surrounding area.  LDCC noted
that it is unclear how the applicant will mitigate against these issues or
where public toilets are to be located.  As such, LDCC objected to the
planning application.  It is noted that the applicant submitted a
response on the 12 September 2025 to address the concerns raised by
LDCC.  LDCC were re-consulted on 19 September 2025, but offered
no updated response, therefore the objection remains extant. LDCC
submitted an additional consultation response which re-iterates the
support for the vision to save and retore Mavisbank House. LDCC note
the issues regarding the access rights to Mavisbank House, however,
LDCC do not consider the proposed private access drive to be the only
option. LDCC consider the access rights at Linden Place and South
Drive to be public and useable. LDCC re-iterated the importance of
protecting Mavisbank Policies, conservation area and historic assets. 
5.9. The Council’s Senior Manager Neighbourhood Services (Roads)
does not object to the application and confirmed that the proposed
access drive will be private and will not be adopted.  It was also
confirmed that the proposed access drive seeks to utilise an existing
field access at the Wadingburn Road (A768) that is already in use.
5.10. The Council’s Land Resources Manager does not object to the
application but advised of the existing core paths in and around
Mavisbank House that may be impacted during construction.  It is
noted that if any paths are required to be closed before, during or after
the construction of the development then details of any route diversion
will need to be agreed prior to the commencement of works. 
6. REPRESENTATIONS
6.1. 17 representations have been received in connection with the
application, of these 15 are objections (from 11 separate households)
and two representations of support.  Full details of the representations
can be viewed on the online planning file. 
6.2. Material considerations in the objection representations include:
• Concerns regarding the proposed works resulting in the future
development of the field.
• There are already existing access routes to Mavisbank House
which should be utilised - the environment should be cared for and
not destroyed when alternatives are available.
• The private development will reduce public access to the site.
Page 30 of 118

Page 31

• The land is located within the greenbelt and protected by policy
ENV1.  The access development and short term let development is
detrimental to this greenbelt.
• The formation of an access drive adversely impacts a protect
designed landscape that is of national significance.
• Concerns regarding the loss of over 80 trees, in-particular the Sitka
Spruce Group of trees which are in good health.
• Concerns about ground stability and high costs for construction and
future maintenance costs.
• Mavisbank House should be made safe but not re-built at the cost
of the natural environment.
• Detrimental impact and distress on the land and wildlife.
• Detrimental impact upon the land, wildlife and immediate
community.
• Loss of trees will increase flood risk.
• Suggested alternative route with alternative surfacing.
• Noted that the funding should be used fully for stabilisation rather
than the formation of the access.
• Concerns regarding light pollution from artificial lighting and the
impact of lighting on wildlife.
6.3. The supporting representation noted that the proposed works appear to
be necessary and that 50 years is long enough to wait for the works to
Mavisbank House to go ahead. 
6.4. An additional supporting representation was received form Mavisbank
Trust. The following points were noted:
• That large sections of Mavisbank’s East Drive have been destroyed
by landslips and are impassable.
• The formation of the new access is critical to enable the stabilise
Mavisbank House.
• The Mavisbank Trust and its partners are currently discussing a
proposal that the Trust will evolve to become a community-led
‘Friends of Mavisbank’ body which will eventually lease the
property to create a major asset for local community use.
• Without basic maintenance Mavisbank House will be lost forever.
7. PLANNING POLICY
7.1. The development plan is comprised of National Planning Framework 4
and the Midlothian Local Development Plan 2017. The following
policies are relevant to the proposal 
National Planning Framework 4 (NPF4)
7.2. Policy 1 Tackling the climate and nature crises; sets out to
encourage, promote and facilitate development that addresses the
global climate emergency and nature crisis. 
Page 31 of 118

Page 32

7.3. Policy 2 Climate mitigation and adaptation; sets out to encourage,
promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change.
7.4. Policy 3 Biodiversity; sets out to protect biodiversity, reverse
biodiversity loss, deliver positive effects from development and
strengthen nature networks. 
7.5. Policy 5 Soils; sets out to protect carbon-rich soils, restore peatlands
and minimise disturbance to soils from development. The policy also
sets out acceptable scenarios for development on prime agricultural
land. 
7.6. Policy 6 Forestry, woodland and trees; sets out to protect and
expand forests, woodland and trees. 
7.7. Policy 7 Historic assets and places; sets out to protect and enhance
historic environment assets and places, and to enable positive change
as a catalyst for the regeneration of places. 
7.8. Policy 8 Green belts; sets out to encourage, promote and facilitate
compact urban growth and use the land around our towns and cities
sustainably.
7.9. Policy 13 Sustainable Transport; sets out to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to travel
unsustainably. 
7.10. Policy 18 Infrastructure first; sets out to encourage, promote and
facilitate an infrastructure first approach to land use planning, which
puts infrastructure considerations at the heart of placemaking. 
7.11. Policy 20 Blue and green infrastructure; sets out to protect and
enhance blue and green infrastructure and their networks. 
7.12. Policy 22 Flood risk and water management; sets out to strengthen
resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to
flooding. 
7.13. Policy 23 Health and Safety; sets out to protect people and places
from environmental harm, mitigate risks arising from safety hazards
and encourage, promote and facilitate development that improves
health and wellbeing. 
Midlothian Local Development Plan 2017 (MLDP)
7.14. Policy TRAN1: Sustainable Travel aims to encourage sustainable
modes of travel.
Page 32 of 118

Page 33

7.15. Policy ENV1: Protection of the Green Belt advises that development
will not be permitted in the Green Belt except for proposals that;
A. are necessary to agriculture, horticulture or forestry; or
B. provide opportunities for access to the open countryside,
outdoor sport or outdoor recreation which reduce the need to
travel further afield; or
C. are related to other uses appropriate to the rural character of the
area; or
D. provide for essential infrastructure; or
E. form development that meets a national requirement or
established need of no other site is available.
Any development proposal will be required to show that it does not
conflict with the overall objectives of the Green Belt which is to
maintain the identity and landscape setting of Edinburgh and
Midlothian towns by clearly identifying their physical boundaries and
preventing coalescence.
7.16. Policy ENV6: Special Landscape Areas states that development
proposals will only be permitted where they incorporate high standards
of siting and design and where they will not have significant adverse
effect on the special landscape qualities of the area. 
7.17. Policy ENV7: Landscape Character states that development will not
be permitted where it significantly and adversely affects local
landscape character.  Where development is acceptable, it should
respect such character and be compatible in terms of scale, siting and
design.  New development will normally be required to incorporate
proposals to maintain the diversity and distinctiveness of the local
landscapes and to enhance landscape characteristics where they have
been weakened.   
7.18. Policy ENV9: Flooding presumes against development which would
be at unacceptable risk of flooding or would increase the risk of
flooding elsewhere.  It states that Flood Risk Assessments will be
required for most forms of development in areas of medium to high
risk, but may also be required at other locations depending on the
circumstances of the proposed development.  Furthermore it states
that sustainable urban drainage systems will be required for most
forms of development, so that surface water run-off rates are not
greater than in the site’s pre-developed condition, and to avoid any
deterioration of water quality. 
7.19. Policy ENV10: Water Environment requires that new development
pass surface water through a sustainable urban drainage system
(SUDS) to mitigate against local flooding and to enhance biodiversity
and the environment.   
Page 33 of 118

Page 34

7.20. Policy ENV11: Woodland, Trees and Hedges states that
development will not be permitted where it could lead directly or
indirectly to the loss of, or damage to, woodland, groups of trees
(including trees covered by a Tree Preservation Order, areas defined
as ancient or semi-natural woodland, veteran trees or areas forming
part of any designated landscape) and hedges which have a particular
amenity, nature conservation, biodiversity, recreation, landscape,
shelter, cultural, or historical value or are of other importance.   
7.21. Policy ENV14: Regionally and Locally Important Nature
Conservation Sites states that development will not be permitted
where it could adversely affect the nature conservation interest of such
sites, unless it can be demonstrated that appropriate mitigation
measures are in place.
7.22. Policy ENV15: Species and Habitat Protection and Enhancement
presume against development that would affect a species protected by
European or UK law.
7.23. Policy ENV19: Conservation Areas states that development will not
be permitted within or adjacent to conservation areas where it would
have any adverse effect on its character or appearance.  
7.24. Policy ENV20: Nationally Important Gardens and Designed
Landscapes states development should protect, and where
appropriate enhance, gardens and designed landscapes. 
Development will not be permitted which would harm the character,
appearance and/or setting of a garden or designed landscape as
identified in the Inventory of historic Gardens and Designed
Landscapes.
7.25. Policy ENV23: Scheduled Monuments states that development which
could have an adverse effect on a scheduled monument, or the
integrity of its setting, will not be permitted.
7.26. Policy ENV24: Other Important Archaeological or Historic Sites
seeks to prevent development that would adversely affect regionally or
locally important archaeological or historic sites, or their setting.
7.27. Policy ENV25: Site Assessment, Evaluation and Recording requires
that where development could affect an identified site of archaeological
importance, the applicant will be required to provide an assessment of
the archaeological value of the site and of the likely impact of the
proposal on the archaeological resource.
7.28. Policy IMP2: Essential Infrastructure Required to Enable New
Development to Take Place states that new development will not take
place until provision has been made for essential infrastructure and
environmental and community facility related to the scale and impact of
the proposal.  Planning conditions will be applied and where
Page 34 of 118

Page 35

appropriate, developer contributions and other legal agreements will be
used to secure the appropriate developer funding and ensure the
proper phasing of development.   
7.29. Policy IMP3: Water and Drainage require sustainable urban drainage
systems (SUDS) to be incorporated into new development.
7.30. Section 59 of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997 places a duty on planning authorities to pay
special attention to the desirability of preserving or enhancing the listed
building or its setting or any features of special architectural or historic
interest which it possesses. 
7.31. Section 64 of the Planning (Listed Buildings and Conservation Areas)
(Scotland) Act 1997 places a duty on planning authorities to pay
special attention to the desirability of preserving or enhancing the
character or appearance of conservation areas.
7.32. Historic Environment Policy for Scotland (HEPS) 2019 offers guidance
on the protection and management of the historic environment and
Conservation Areas and areas of special architectural or historic
interest, the character or appearance of which it is desirable to
preserve or enhance. Their designation provides the basis for the
positive management of an area. The Policy Statement also indicated
that the planning authority should consider the design, materials, scale
and sitting of any development, and its impact on the character of the
historic environment.
7.33. Historic Environment Scotland’s document Mavisbank Policies,
Designed Landscape, Conservation Management Plan V3 provides
guidance and policies for the future management of the designed
landscape balanced with the architectural, archaeological, historical
and ecological significance of the place. The Conservation
Management Plan sets out the following statements of what it is
intended to achieve in the planning and design any project, as the
basis for management policies and any actions derived from them. 
• To conserve historic features of all periods by protection,
stabilisation and restoration as appropriate.
• To achieve integrated development of the house uses and
proposals with those for the landscape.
• To maximise accessibility of the landscape for all users and
provide links with and between local communities.
• To plan for the use of Mavisbank by both local people and
visitors and involve them in planning and management.
• To preserve and enhance the separation of the local settlements
provided by the wooded valley.
• To encourage mental and physical health and well-being in the
local and wider community by enjoyment of the outdoors and
exercise.
Page 35 of 118

Page 36

• To promote understanding of the history and development of
Mavisbank and its natural values and make good use of its
educational potential.
• To enhance the existing natural habitats and increase their
species diversity, including care of protected species.
• To incorporate new uses and features where compatible with
the significance of the place that will benefit future viability.
• To increase knowledge and understanding of the development
of the landscape by research and site investigations.
• To manage using environmentally sustainable methods,
minimising environmental impacts.
• To develop proposals that make full use of funding opportunities
and income from the resources of the site.
7.34. The Midlothian Council document Conservation Area Character
Appraisal & Management Plan for Mavisbank highlights the
significance of the conservation area in terms of townscape,
landscape, architecture and history and provides a framework for
conservation area management and for managing change within the
conservation area and reaffirms the importance of the designation of
the area. Midlothian Council’s Conservation Area Character Appraisal
& Management Plan identifies the key characteristics of the historic
environment to establish a context within which change can continue in
a way which enhances historic character of the area.
8. PLANNING ISSUES
8.1. The main planning issues to be considered in determining this
application is whether the proposal complies with development plan
policies unless material planning considerations indicate otherwise.
The representations and consultation responses received are material
considerations.
Principle of Development
8.2. The application site is located within the greenbelt, a special landscape
area, the Mavisbank Conservation Area and the Mavisbank Designed
Landscape and, as such, these designations all contain restrictions, set
out in various planning policies, to protect the character and
appearance of the landscape and historic environment. 
8.3. The planning application seeks permission to form a vehicle access
route, along with other associated works, to enable operations which
form phase one of the approved stabilisation and repair work to the
ruined Mavisbank House.
8.4. The submitted Planning Statement records that the applicant, the
Landmark Trust, plan to bring forward a second phase of work at
Mavisbank House which will comprise of the re-roofing and restoration
of the house for use as a holiday let and community use with
Page 36 of 118

Page 37

educational initiatives.  The proposed phase two works do not form any
part of the current application nor are there any planning applications
pending consideration for this work.  Should an application for phase
two works be forthcoming it will be assessed on its own merits and
against the planning policies of the time.  The current planning
application is only for the formation of an access drive and the
associated works to enable the phase one works to be carried out. 
8.5. While adopted MLDP policy ENV1 and NPF4 policy 8 restrict
development within the greenbelt in some cases the current proposal
seeks to provide essential infrastructure to enable the stabilisation,
repair and rebuilding of an internationally recognised important
category A listed building which makes a substantial contribution
towards the national historic landscape.  The short-term plans and
long-term aspirations for the site sit comfortably with current greenbelt
policies which specifically provide support for development which is
associated with the reuse, rehabilitation and conversion of historic
environment assets.  Therefore, the development proposal is not
contrary to the aims of the development plan polices, provided the
physical development does not have an adverse impact on the local
landscape, special landscape area, conservation area, garden and
designed landscape.
Landscape, Landscaping and Trees
8.6. Midlothian Council’s Conservation Area Character Appraisal &
Management Plan for Mavisbank identifies one of the opportunities for
enhancement as being the full exterior restoration of Mavisbank House,
combined with the creation of an interior which respects and reflects
the original internal layout and design of this nationally significant 18th
century Palladian villa as much as possible.  The plan also supports
the opportunity for the house to combine a viable economic end use for
the building with uses that provide direct community benefit.  The
current planning application seeks to enable phase one of the
rehabilitation works which would comply with this aspiration of the
management plan.  
8.7. The proposed access drive, retaining wall, fence and associated works
will have a localised impact on the landscape and views in the North
Esk Special Landscape Area, Mavisbank Conservation Area and
Mavisbank Designed Landscape, mainly because of tree removals,
ground works and the introduction of the new access drive.  However,
the existing landform, extent of vegetation cover and secluded nature
of the existing landscape setting limit the extent to which these impacts
will be experienced from the immediate or wider area surrounding the
site.
8.8. The development proposals will have a significant impact on existing
tree cover, including on trees within an area listed in the Ancient
Woodland Inventory.  Approximately 86 trees will be lost due to the
Page 37 of 118

Page 38

development. None of these trees are ancient or veteran trees. The
trees are being removed to accommodate the new access route
alignment and associated visibility splay; as well as to open up and
reinstate historic views and vistas in accordance with the Conservation
Management Plan for Mavisbank and its policies. 
8.9. During construction the tree removals and exposed soil will be more
evident in views from specific locations, in particular parts of the core
path network, from local neighbouring properties and parts of
Wadingburn Road.  Upon completion the new access drive and
associated planting/verge seeding will initially still be visually noticeable
as new features from very localised views. However, in the longer term,
given the nature of the development and sensitive design (in terms of
layout, materials and species selection) the development will not give
rise to significant adverse visual impacts overall. Furthermore, as the
mitigation and enhancement planting matures it will result in an overall
beneficial visual effect.
8.10. The supporting statements include proposals for tree root protection
areas (RPA) and fencing, which are appropriate and should be
accompanied by an arboricultural method statement (AMS) that details
relevant arboricultural mitigation.  Should planning permission be
granted, this can be secured by condition which should incorporate a
timeline for works affecting trees, details on how site access and
materials storage will be managed to prevent soil compaction, and
specific procedures for (ground) works/ construction operations so that
potential impacts on existing trees and RPAs are minimised.
8.11. The development proposals include mitigation and enhancement
planting that will further allow the development to be integrated within
the landscape, especially as the planting matures.  The proposed
compensatory planting includes a mix of species, sizes and numbers/
densities that are locally appropriate and complement the existing
landscape setting and species mix.  The location of the 90 extra heavy
standard trees has been carefully chosen to allow for successional tree
growth whilst maintaining key views and vistas.  The addition of mixed
native woodland and hedgerow planting will also further promote
biodiversity and support habitat for wildlife.
8.12. Furthermore, the development proposals and associated landscaping
works will see the reinstatement of historic views and vistas and the
removal of Sitka Spruce, in accordance with the Conservation Area
Management Plan, is considered to have a potential beneficial impact
on the character of the conservation area and the designed landscape.
8.13. Whilst the proposed development will have an initial adverse impact on
tree cover and localised areas of scrubland and woodland habitat it is
evident that the development is as sensitively sited as possible to avoid
and minimise impacts on the RPA of significant heritage trees.  The
proposals also seek to promote and reinstate the original character,
Page 38 of 118

Page 39

views and vistas that are a key part of the designed landscape at
Mavisbank. 
8.14. Overall, whilst there will be some localised negative impacts on the
special landscape area, conservation area and designed landscape the
positive conservation benefits to both the house and its designed
landscape outweigh this.  It is important to note that the proposed
development is only acceptable because it is a crucial first step to
enable the conservation and restoration of this internationally important
heritage asset. 
Flood Risk and Drainage
8.15. The development proposals include filter drains running alongside the
access drive and swales to manage any surface water runoff towards
the existing Scottish Water outflow.  Scottish Water has not objected to
the planning application. 
Road Safety
8.16. The access route is proposed only as a construction access/private
access road to Mavisbank House to enable stabilisation and other
repair works to the listed building.  The proposed access from
Wadingburn Road has been designed to comply with visibility
standards, with visibility splays of 2.4m by 90m to the west and 2.4m
by 120m to the east.  The Council’s Senior Manager Neighbourhood
Services (Roads) raised no concerns in terms of road safety. 
Amenity
8.17. Whilst the proposed access drive will enable direct vehicle movements
between Wadingburn Road and Mavisbank House, it will not result in a
harmful loss of amenity for the closest residential properties due to the
siting and distance from those properties.
Soil Management
8.18. The development proposal includes groundworks to achieve the
proposed finished levels - this includes the excavation of woodland and
prime agricultural soils which are a valuable resource and need
appropriate handling.  It is also noted that the proposals will require cut
and fill works which will also see a substantial net volume of soil to be
brought in. should planning permission be granted, details of the
specification of any imported soils along with a soil management plan
should be conditioned so as to ensure that valued soils are protected
and restored in order to comply with NPF4 policy 5.
Page 39 of 118

Page 40

Other matters 
8.19. It is noted that LDCC raised concerns in relation to the potential
exposure of the site and conservation area to increased visitors and
therefore a likely increase in littering, BBQ’s, campfires, late night
noise, wild comping which will all have a detrimental effect on the
surrounding area.  These matters are generally material planning
considerations, however the development is for a private access route
to facilitate the rehabilitation of Mavisbank House.  The proposals, at
this stage, do not provide for any more public access than is currently
the case.  LDCC also sought clarification in relation to the location of
public toilets.  Again, it is noted that the current planning application
relates to the formation of access road only and does not include the
provision of public toilets. 
8.20. There were concerns raised by representors in relation to the
development proposals. All material planning considerations raised
within the representations have been addressed above within this
section of the report.
8.21. With regards to the concerns regarding the proposed works resulting in
the future development of the field, or that conditions should be
attached restricting development within the fields, it is noted that each
planning application is assessed on its own merit. Should any
applications for the fields be forthcoming they would be assessed
against the adopted national and local planning policies at the time,
also taking in to account any material planning considerations. The
potential for future planning applications or development is not a
material planning consideration in the assessment of the current
planning application. 
8.22. With regards to the comments suggesting that the existing access
routes to Mavisbank House be utilised, various access options were
investigated, and the Council has been asked to consider the route
submitted as part of this planning application. 
8.23. With regards to the concerns relating to the impact of the proposed
development on the environment, landscaping, trees and wildlife as
well as concerns regarding walks that public will not be able to access.
The impact of the proposal on the existing trees, landscape, soils and
protected species has been taken into consideration. With regards to
the concerns relating to access routes, the proposals do not look to
alter or restrict any public paths or routes. 
8.24. With regards to concerns relating to the ground stability and high costs
for construction and future maintenance costs, concerns regarding
construction and maintenance costs are not material planning
considerations. 
Page 40 of 118

Page 41

8.25. Overall, all relevant matters have been taken into consideration in
assessing the application.  The proposal accords with the principles
and policies of National Planning Framework 4 the Midlothian Local
Development Plan 2017 and Historic Environments Scottland’s Policies
and Guidance and is acceptable in terms of all other applicable
material considerations.  
Matters raised at previous Planning Committee
8.26. This application was previously presented to the Committee on 20
January 2026.  Committee deferred making a decision on the planning
application for a site visit and to secure the following information:
• Details of the alternative access options including details of
negotiations between applicant, the Council and landowners;
• Details of the community engagement undertaken; and,
• Details of traffic management to manage the mix of construction
traffic and walkers/other users.
8.27. The applicant was asked to respond to the abovementioned requests
for information. Appendix A attached to this report details the
applicant’s responses to the three requests for information.  Appendix
B of this report provides additional information with regards to the
second matter, relating to community engagement.
9. RECOMMENDATION
9.1 That planning permission be granted for the following reason:
The proposals are required to enable the stabilisation, repair and
restoration of Mavisbank House which is a category A listed building of
outstanding architectural and historic importance.  Whilst the proposals
will have a short-term impact upon the appearance of the landscape, it
will not be a detrimental impact upon the character or appearance of
the special landscape area, conservation area, garden and designed
landscape or setting of listed buildings. Therefore, the proposal
complies with the aims of Historic Environment Scotland’s Policy and
Guidance and Policies 7 and 8 of National Planning Framework 4
(NPF4) and ENV1, ENV6, ENV19, and ENV20 of Midlothian Local
Development Plan (MLDP). 
Subject to the following conditions:
1. The development to which this permission relates shall commence
no later than the expiration of three years beginning with the date
of this permission.
Reason: To accord with the provisions of Section 58 of the Town
and Country Planning (Scotland) Act 1997 (as amended by the
Planning (Scotland) Act 2019).
Page 41 of 118

Page 42

2. Development shall not begin until details and, if requested,
samples of materials to be used on external surfaces of the hard
ground cover surfaces; means of enclosure and ancillary structures
have been submitted to and approved in writing by the planning
authority. Development shall thereafter be carried out using the
approved materials or such alternatives as may be agreed in
writing with the planning authority.
Reason: To ensure the quality of the development is enhanced by
the use of quality appropriate materials to reflect its setting in
accordance with policies DEV2 and DEV6 of the Midlothian Local
Development Plan and national planning policy, guidance and
advice.
3. Notwithstanding the plans hereby approved, prior to the siting of
the gate hereby approved, full detailed elevational plans of the
proposed gate and timescales for the installation of the gate shall
be submitted to the planning authority for prior written approval.
Development shall thereafter be carried out using the approved
materials and within the agreed timescales or such alternatives as
may be agreed in writing with the planning authority.
Reason: These details were not included in the application
submission. So as to ensure the elevational details of the detailed
design of the proposed gate does not result in an adverse impact
on the character or appearance of the landscape, special
landscape area, conservation area and garden and designed
landscape and to ensure the timeous installation of the gate.
4. No development shall take place at the application site until the
applicant, or their successor has undertaken and reported upon a
programme of archaeological (Survey and recording,
Archaeological Monitoring) work in accordance with a written
scheme of investigation which along with the report have been
submitted to and approved in writing by the planning authority.
Reason: To ensure this development does not result in the
unnecessary loss of archaeological material in accordance with
policies ENV24 and ENV25 of the Midlothian Local Development
Plan.
5. If any paths are required to be closed before, during or after the
construction of the development hereby approved, details of any
route diversions must be agreed in writing by the planning authority
prior to the closure of said route.
Reason: To ensure that the public routes and access are retained.
6. Notwithstanding the Tree Root Protection Areas and Fencing Plan
hereby approved, development shall not begin until the following
Page 42 of 118

Page 43

additional details have been submitted to and approved in writing
by the planning authority. Details of the scheme shall include:
a) Arboricultural Method Statement (AMS);
b) Detailed timeline for works affecting trees;
c) Details on how site access and materials storage will be
managed; and
d) Details of (ground) works/ construction operations.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be agreed in writing
with the planning authority. All site operations and works affecting
trees shall be carried out in accordance with any approved AMS
and BS3998:2010 Tree Work. 
Reason: To ensure the development does not result in the loss or
damage of a tree which merits retention.
7. Notwithstanding the plans hereby approved, prior to the
commencement of development, a Soil Management Plan, that
sets out details and appropriate methods for soil handling, storage
and re-use, shall be submitted to the planning authority for prior
written approval. Development shall thereafter be carried out in
accordance with the approved details or such alternatives as may
be agreed in writing with the planning authority.
8. Notwithstanding the plans hereby approved, prior to the
commencement of development, prior to the importation of any
soils to the site, full details and specification for any imported soils,
including source and make-up to suit the intended purpose in
accordance with BS3882 :2015 Specification for Topsoil and
Requirements for Use, shall be submitted to the planning authority
for prior written approval. Development shall thereafter be carried
out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Reason for conditions 7 and 8: To ensure that valued soils are
protected and restored in accordance with policy 5 of National
Planning Framework 4.
9. Notwithstanding the plans and supporting statements hereby
approved, development shall not begin until the following additional
landscaping details have been submitted to and approved in writing
by the planning authority. Details of the scheme shall include:
a) Detailed planting proposals (including species annotations for
all Extra Heavy Standard trees);
b) Specification for tree, hedgerow and woodland planting, and
meadow seeding (including preparation of soil, stakes, ties
and guards to protect from grazing/ browsing wildlife); and
Page 43 of 118

Page 44

c) programme for completion and subsequent maintenance of all
soft and hard landscaping including existing trees to be
retained. The landscaping shall be completed prior to the
development being occupied. Any tree felling or vegetation
removal proposed as part of the landscaping scheme shall
take place out with the bird breeding season (March-August);
unless a suitably qualified ecologist has, carried out a
walkover survey of the felling/removal area in the 48 hours
prior to the commencement of felling/removal, and confirmed
in writing that no breeding birds will be affected.
All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as
per the programme for completion and subsequent maintenance
(c). Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of the completion
of the development shall be replaced in the following planting,
season by trees/shrubs of a similar species to those originally
required.
Reason: To ensure the quality of the development is enhanced by
landscaping to reflect its setting in accordance with policy DEV7 of
the Midlothian Local Development Plan and national planning
policy, guidance and advice.
10. The recommendations set out for Badgers, Bats and other
protected species detailed in section 3.5 Ecological survey report
2024 hereby approved shall be adhered to during development
works.
Reason: The submitted and approved Ecological Survey Report
made recommendations that relate to protected species that should
be adhered to.
11. Development shall not begin until an application for approval of
matters specified in conditions for a Construction Environment
Management Plan (CEMP) has been submitted to and approved in
writing by the planning authority. The CEMP shall include:
i. details of construction access routes;
ii. signage for construction traffic, pedestrians and other users
of the site;
iii. controls on the arrival and departure times for construction
vehicles, delivery vehicles and for site workers (to avoid
school arrival/departure times);
iv. details of piling methods (if employed);
v. details of any earthworks;
vi. control of emissions strategy;
vii. a dust management plan strategy;
viii. waste management and disposal of material strategy;
Page 44 of 118

Page 45

ix. a community liaison representative will be identified to deal
with the provision of information on the development to the
local community and to deal with any complaints regarding
construction on the site;
x. prevention of mud/debris being deposited on the public
highway;
xi. material and hazardous material storage and removal; and
xii. controls on construction, engineering or any other operations
or the delivery of plant, machinery and materials (to take
place between 0700 to 1900hrs Monday to Friday and 0800
to 1300hrs on Saturdays).
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be approved in writing
with the planning authority.
Reason: To control the construction activity on the site, ensure
environmental impact during the construction period is acceptable
and to ensure appropriate mitigation is in place.
Peter Arnsdorf
Head of Placemaking
Date: 17 April 2026
Application No:  25/00306/DPP
Applicant:  The Landmark Trust
Agent:         Nikki McAuley, Ironside Farrar
Validation Date: 19 June 2025
Contact Person: Whitney Lindsay
Email:    Whitney.Lindsay@midlothian.gov.uk
Attached Plans: Location Plan, Landscape Planting and
Maintenance Schedule and Site Photographs
Additional Information Requested by Committee Appendix 1:
Appendix 2: Details of Community Engagement
Page 45 of 118

Page 46

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2025)
Formation of access road; erection of retaining wall
and fence and associated works.
Mavisbank Estate, Lasswade Road, Loanhead.
File No. 25/00306/DPP
Scale 1:4000Page 46 of 118

Page 47

Earthwork
LP
RS
RS
RS
RS
RS
TP
EP
EP
EP
EP
EP
P
P
P
P
P
P
P
P
P
Stay
Stay
GV
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
Marsh
TL
E/L
E/L
E/L
E/L
E/L
E/L
E/L
R/L
R/L
R/L
R/L
R/L
R/L
R/L
R/L
R/L
Soffit
LM6
LM6A
LM6B
LM7
LM8
LM9
PSM7
LM9A
LM10
LM11
L1
LM10A
LM10B
LM12
LM11A
LM12A
LM13
LM14
LM20
LM15
LM16
LM17
LM12B
PSM4
LM12C
LM12D
LM18
LM19
LM21
LM22
LM23
LM24
LM25
LM26
LM27
LM35
LM36
LM37
LM38
LM39
A3
A4
127.80
119.44
123.16
118.53
94.09
94.27
94.93
95.57
108.07
102.28
102.55
100.82
100.47
106.76
105.39
105.95
107.48 106.47
105.56
101.23
112.09
111.04
116.81
113.29
91.09
114.76
112.12
112.45
121.99
103.99
102.79
85.19
85.36
84.92
84.81
84.85
85.15
85.16
85.16
120.36
123.76
122.77
115.93
98.03115.14
115.28
106.51
122.41
105.33
102.34
109.61
87.85
85.90
86.35
87.94
89.81
90.52
90.64
90.36
117.85
107.60
114.33
99.43
112.05
120.61
99.21
108.33
121.10
116.57
120.19
114.12
106.67
99.66
99.9799.77
100.41 100.22
100.15
100.08
100.02
101.32 100.96
100.74
93.74
93.16
92.89
92.81
92.53
92.26
92.51
92.71
93.27
93.60
93.85
97.54
97.53
97.50
97.43
97.22
94.26
94.67
95.44
96.29
94.08
96.07
96.76
100.14
115.81
116.31
132.60
132.72
126.24
121.42
111.42
106.44
106.24
106.15
91.74
92.49
111.83
110.02
112.78
116.19
116.77
91.81
113.54
120.30
110.50
106.46
106.52
101.83
101.85
108.98
104.20
101.84
106.53
105.98
94.55
94.37
94.46
94.40
94.39
94.26
93.85
96.07
96.34
96.24
95.91
95.53
95.85
95.84
95.95
95.97
96.19
96.13
96.05
96.01
96.06
96.42
96.37
96.18
96.02
95.62
95.66
95.04
95.56
95.65
95.85
117.16
118.30
116.26
117.15
123.65
124.95
124.99
125.93
124.16
131.16
116.74
119.16
94.60
94.43
94.20
95.07
94.46
94.41
95.54
95.68
95.45
95.20
95.25
113.55
112.15
114.80
96.01
95.98
96.39
97.85
97.63
96.97
96.24
97.07
97.19
97.92
98.91
100.29
100.41
100.46
99.03
99.14
98.91
98.23
97.93
96.86
96.09
96.09
95.86
95.83
95.89
95.73
95.55
95.31
117.27
110.19
121.37
126.02
118.38
133.99
123.39
130.92
131.24
133.27
110.96
109.70
91.98
92.90 109.25
108.31
91.02
111.22
112.55
110.09
108.45
101.16
93.97
93.73
93.81
93.18
93.05
92.83
92.88
92.77
92.50
92.16
92.02
91.63
91.78
91.85
91.75
91.68
94.28
94.41
94.52
94.49
94.62
107.60
128.61
118.38
117.60
114.80
112.20
114.85
109.49
113.99
113.95
93.92
86.79
86.07
85.42
85.03
103.11
102.91
104.19
96.97
105.04
114.87
117.16
111.96
112.18
112.29
112.39
112.47
112.72
112.79
112.83
112.90
113.10
112.96
112.75
112.68
112.89
112.95
113.00
112.88
112.78
112.75
112.45
112.44
112.40
112.46
112.50
112.64
112.88
112.87
113.31
113.66
114.01
114.42
115.05
115.86
115.57
114.72
113.74
113.83
113.81
113.85
114.06
114.03
113.98
114.04
114.07
114.09
114.15
114.22
114.32
114.27
114.55
114.65
114.93
114.95
115.18
115.34
115.69
110.5
110.5
110.5
110.5
110.5
111.0
111.0
111.0
111.0
111.0
110.0
110.0
110.0
110.0
110.0
107.5
107.5
107.5
107.5
107.5
107.5
107.5
105.5
105.5
105.5
105.5
105.5
105.5
105.5
105.5
103.0
103.0
103.0
103.0
103.0
103.0
103.0
103.0
103.0
103.0
103.5
103.5
103.5
103.5
103.5
103.5
103.5
103.5
103.5
103.5
103.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
104.5
105.0
105.0
105.0
105.0
105.0
105.0
105.0
105.0
109.5
109.5
109.5
109.5
109.5
109.5
109.0
109.0
109.0
109.0
109.0
109.0
109.0
108.5
108.5
108.5
108.5
108.5
108.5
108.5
108.0
108.0
108.0
108.0
108.0
108.0
108.0
106.5
106.5
106.5
106.5
106.5
106.5
106.5
106.0
106.0
106.0
106.0
106.0
106.0
106.0
107.0
107.0
107.0
107.0
107.0
107.0
107.0
107.0
104.0
104.0
104.0
104.0
104.0
104.0
104.0
104.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
93.0
115.0
115.0
115.0
115.0
115.0
114.5
114.5
114.5
114.5
114.5
114.5
114.0
114.0
114.0
114.0
113.5
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
113.0
112.5
112.5
112.5
112.5
112.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.5
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
101.0
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
100.5
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.0
102.5
102.5
102.5
102.5
102.5
102.5
102.5
102.5
102.5
102.5
102.5
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.5
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
99.0
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.5
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
98.0
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.5
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
97.0
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.5
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
96.0
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
95.5
111.5
111.5
111.5
111.5
112.0
112.0
112.0
112.0
84.0
84.0
84.5
84.5
84.5
84.5
84.5
84.5
84.0
84.0
101.0
101.0
101.0
101.0
101.0
102.5
102.0
101.5
101.5
101.5
101.5
101.5
102.0
102.0
102.5
102.5
103.0
103.0
103.5
103.5
104.0
104.0
104.5
105.0
87.0
87.0
86.5
86.5
86.0
85.5
87.5
87.5
87.5
88.5
94.0
94.0
94.0
96.5
96.5
96.0
96.0
95.5
95.5
95.0
95.0
94.5
94.5
105.0
105.0
105.0
105.0
104.5
104.5
104.5
104.5
97.0
97.5
98.5
98.0
105.5
96.5
96.5
96.5
96.5
95.5
95.0
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.0
94.0
94.0
94.0
94.0
94.0
94.0
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.0
93.0
93.0
93.0
93.0
93.0
93.0
96.0
96.0
96.0
96.0
96.0
96.0
95.5
95.5
95.5
95.5
95.0
95.0
95.0
95.0
98.5
98.0
97.5
97.5
97.5
97.5
97.5
97.0
97.0
97.0
97.0
98.0
98.0
98.0
98.0
104.0
104.0
104.0
104.0
103.5
103.5
103.5
103.5
103.0
103.0
103.0
103.0
102.5
102.5
102.5
102.5
102.0
102.0
102.0
102.0
101.5
101.5
101.5
101.5
101.0
101.0
101.0
101.0
100.5
100.5
100.5
100.5
100.0
100.0
100.0
100.0
99.5
99.5
99.5
99.5
99.5
99.0
99.0
99.0
99.0
98.5
98.5
98.5
98.5
99.0
108.0
108.0
107.5
107.5
107.5
107.5
107.0
107.0
107.0
106.5
106.5
106.5
106.5
106.0
106.0
106.0
105.5
105.5
105.5
105.5
89.5
89.5
89.5
89.5
89.5
89.5
89.0
89.0
89.0
89.0
89.0
88.5
88.5
88.5
88.5
88.0
88.0
88.0
88.0
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
93.5
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
95.0
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.5
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
94.0
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.5
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.092.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
92.0
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.5
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
91.0
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.590.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
90.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
88.5
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
90.0
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.5
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
89.0
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
87.5
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
88.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
87.0
86.5
84.5
84.5
84.5
84.5
84.0
84.0
84.0
84.0
83.5
83.5
83.5
83.0
83.0
86.0
86.0
86.0
86.0
86.0
86.0
86.0
86.086.0
86.0
86.0
86.0
86.0
86.0
86.0
86.0
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
85.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
86.5
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
85.0
82.5
83.0
84.5
84.5
126.0
125.5
125.0
125.0
124.0
124.0
123.5
123.5
123.0
123.0
123.0
124.5
124.5
122.5
122.5
122.5
122.0
122.0
122.0
120.5
120.5
120.5
121.0
121.0
121.0
121.5
121.5
121.5
120.0
120.0
120.0
119.5
119.5
119.5
119.0
119.0
118.5
118.5
117.5
117.5
117.5
118.0
118.0
118.0
117.0
117.0
117.0
116.5
116.5
116.5
116.0
116.0
116.0
116.0
115.5
115.5
115.5
115.5
94.0
94.0
94.0
94.0
108.5
95.0
123.5
94.5
114.5
112.5
112.5
116.5
1625
Steps
No Access
Levels
Assumed
(Heavy Vegetation)
Top ofChimney
Fallen
Trees
Ruined
Building
Shelter
Gorse Bushes
Contours Indicative Only
Overgrown
Area
Collapsed
Building
No Access
Concrete
Panels 0.5m
Tarmac
Metal1.0m
Wood 1.2m
Wood 1.0m
Post & Wire 1.0m
Post & Wire 1.0m
Gravel Track
Fa;;em Tree
Fallen
Tree
Fallen
Tree
Trunk
Only
Fallen Trunk
Dense
Trees
Fallen
Tree
Dead
Tree
Wood 1.0m
Post & Wire 1.0m
Stump
Path
Collapsed
Chimney
Steps
No Access
Rough
Grass
Rough
Grass
Area of
Dense Small Trees
Area of
Dense Small Trees
Area of
Dense Small Trees
Area of
Dense Small Trees
Area of
Dense Small Trees
Pond
Pond
Overgrown
Steps
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Area of Dense
Small Trees
Tree Ht
Fallen
Tree
Tree Ht.
Tree Ht.
Conifer
Trees
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
1541
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht. Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Post & Wire 1.0m
Tree Ht.
Tree Ht.
Tree Ht.
Stone Retaining Wall
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Dense
Vegetation
No Access
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht. Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Small
Trees
Seating
Tree Ht.
Tree Ht
Tree Ht.
Tree Ht.
Tree Ht
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Post & Wire 1.2m
1612
Metal 1.0m
Tree Ht.
Tree Ht.
Bushes and
Small Trees
Bushes and
Small Trees
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Brick R/W
Tree Ht
Tree Ht
441
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Rough
Grass
Dense
Small Trees
Tree Ht.
Tree Ht.
Approximate
Position
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht
Tree Ht.
1628
Tree Ht.
Tree Ht.
Tree Ht.
1627
Tree Ht
Tree Ht
Tree Ht
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht.
Tree Ht
Area of
Dense Small Trees
Area of
Dense Small Trees
Contours Inidicative Only
Post & Wire 1.0m
Post & Wire 1.0m
Stone Wall 0.6m
Stone Wall 0.6m
Tree Ht.
Tree Ht.
Tree Ht.
Bottom of Slope Buried Footpath
Assumed Back of Footpath
Tarmac Footpath
Wooden 1.2m
Wooden 1.2m
Stone 1.8m
Tarmac Footpath
Post & Wire 1.2m
Post & Wire 1.2m
Post & Wire 1.2m
Grass
Arable
Post & Wire 1.2m
Post & Wire 1.2m
Post & Wire 1.2m
Post & Wire 1.2m
Dead
Tree
Wood 1.0m
G
FH
CTV
G
G
G
G
BT
G
BT
MH CL
G
Post & Wire 1.2m
Area of
Trees
Post & Wire 1.2m
Post & Wire 1.2m
Arable
Wadingburn Road A768
Grass
CTV
Bushes 1.5m
MH CL
G
G
G
G
G
Tarmac Footpath
Post & Wire 1.2m
302.2
B
x140B
4813C
4812C
4811C4810C
x141B
4809C
4808Cx142C
4806C
x143C
4805C
x144C
x145C
4807C
4804N
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHS
EHSEHS
EHS
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
290.000
300.000
310.000
320.000
330.000
340.000
350.000
360.000
370.000
380.000
390.000
400.000410.000
420.000
430.000
440.000
450.000
460.000
470.000
480.000
490.000
500.000510.000
520.000
530.000
540.000
550.000
560.000
570.000
580.000
590.000
600.000
610.000
620.000
630.000
640.000
650.000660.000
670.000
680.000
690.000
700.000
710.000
720.000
730.000
740.000
750.000
760.000
770.000
780.000
790.000
800.000
810.000
820.000
830.000
840.000
850.000
Former allées
Central parkland
Terrace walk
Forecourt
South drive
woodland
Roman hill
terraces
Lochan
North
lochan
parkland
Valleyside woods south
Axis wood north
Axis wood south
111 McDonald Road, EDINBURGH, EH7 4NW
0131 550 6500  |  mail@ironsidefarrar.com
S4 - FOR STAGE APROVAL
Suitability Description:
Scale: Paper Size:
EnvironmentalConsultants
IronsideFarrar
Title:
Client:
Project:
Copyright Acknowledgement: Ordnance Survey ©
Crown Copyright 2022 | All rights reserved. Licence No. AL100017966
Quality Assurance: ISO
9001:2015 SGS UKAS Certificate GB02/54539
0 10 20 30 40 50 100mm on original60 70 80 90
Drawing Number: Revision
Mavisbank House Access Drive
The Landmark Trust
Landscape Planting and
Maintenance Schedules
1:1250 A1
P0265190-IFL-00-00-DR-C-116
Rev Date Description DR CH
P01 09.06.25 Issued for planning approval. GB GS
P02 11.08.25 Updated to mixed hedge planting
schedule
AI GS
0 50 100
m
Management & Maintenance Schedules
ESTABLISHMENT MAINTENANCE: First two years undertaken by selected contractor; Months Operations per year
Operations J F M A M J J A S O N D No of operations
GENERAL REQUIREMENTS
Leafing out inspection, plant material not leafed out shall be replaced by the contractor at his own cost during plant
replacement operations √ 1
100% of plant material to be present at handover
90% vegetation free 1m circle centred on each plant to be maintained around planting including mulch cover
during establishment period & for extent of contract duration √ √ √ √ √ √ √ √ 8
Hand weed inside shelters √ √ 2
Check stakes, ties and guards, adjust as required √ √ 2
Water at frequency to ensure establishment and survival √ √ √ √ √ √ As required
Firm plants & keep vertical as required √ √ 2
Clear plant stations and planting areas of litter √ √ √ √ √ √ √ √ As required
Check all plants for signs of pest, disease or nutrient deficiency & seek expert advice as required √ √ 2 or as required
Plant replacements: planting that has failed or is damaged by herbicide application should be replaced during the
next growing season √ 1 or as required
Pruning: all planting material to be checked for damage to branches, shoots & bark. All dead, damaged
branches/shoots or epicormic growth to be cleanly cut back to sound, undamaged wood. All tree works to be
undertaken in accordance with BS 3998: 1989. Prunnings & trimmings to be removed from site
√ 1 or as required
Remove plant shelters, to be confirmed by Landscape Architect √ TBC
INDIVIDUAL TREE PLANTING
Check stakes & ties; replace loose, broken or decayed items to original specification. Adjust, refix or replace loose
or defective ties, allowing for growth and to prevent chafing. - Where chafing has occurred, reposition, or replace
ties to prevent further chafing
√ 1 or as required
Check irrigation tubes/caps √ 1
NATIVE MIXED HEDGING
Trim to 60cm height after planting, maintain at 1m with slight batter to top, trim any rangy branches to 60cm width √ √ 2
WILDFLOWER/SEEDING VERGES
Cut at 150mm height to 50mm height, remove arisings after each cut (year 2: 2 cuts per year - spring & autumn) √ √ √ √ 4 for first year/ 2
thereafter
LITTER PICKING √ √ √ √ √ √ √ √ √ √ 10
GENERAL MAINTENANCE: From years 2 to 10;
After 10 years we suggest the maintenance regime is revised to ensure best practice and relevance to the stage of
development of the landscape.
Months Operations per year
Operations J F M A M J J A S O N D No of operations
GENERAL REQUIREMENTS
90% vegetation free 1m circle centred on each plant to be maintained around planting including mulch cover. √ √ √ √ 4
Check stakes, ties and guards, adjust as required √ √ 2
Firm plants & keep vertical as required √ √ 2
Check all plants for signs of pest, disease or nutrient deficiency & seek expert advice as required 2 or as required
Plant replacements: planting that has failed or is damaged by herbicide application should be replaced during the
next growing season
√ 1 or as required
Pruning: all planting material to be checked for damage to branches, shoots & bark. All dead, damaged
branches/shoots or epicormic growth to be cleanly cut back to sound, undamaged wood. All tree works to be
undertaken in accordance with BS 3998: 1989. Prunnings & trimmings to be removed from site
√ 1 or as required
Woodland block planting to be reviewed on site with landscape architect at year 3 and selective thinning to be
undertaken as required
1no (timing to be
agreed)
INDIVIDUAL TREE PLANTING
Check stakes & ties; replace loose, broken, or decayed items to original specification. Adjust, refix or replace loose
or defective ties, allowing for growth and to prevent chafing. - Where chafing has occurred, reposition, or replace
ties to prevent further chafing
√ 1 or as required
Check irrigation tubes/caps √ 1
NATIVE MIXED HEDGING
Maintain at 1m with slight batter to top, trim any rangy branches to 60cm width √ √ 2
WILDFLOWER/SEEDING VERGES
Cut at 150mm height to 50mm height, remove arisings after each cut.
LITTER PICKING √ √ √ √ √ √ √ √ √ √ 10
Tree Planting Schedule
Ref Species Type/ Size Girth
(cm)
Clear Stem
(Min cm)
Height
(Min cm) Root Type Total
Ac Acer campestre EHS 14 - 16 200 400 - 450 Root Ball 6
Bp Betula pubescens EHS 14 - 16 -- 200 - 250 Root Ball 15
Cm Crataegus monogyna EHS 14 - 16 200 400 - 450 Root Ball 23
Ps Pinus sylvestris Feather (5x) -- -- 250 - 350 Root ball 8
Pa Prunus avium EHS 14 - 16 200 400 - 450 Root Ball 7
Qp Quercus robur EHS 14 - 16 200 450 Root ball 23
Sa Sorbus aucuparia EHS 14 - 16 200 400 - 450 Root Ball 8
Native Core Mix - Higher proportion of feathers and transplants
10% Feathers (2m centres) Form Age Height
cm
Root
Condition
Habit/
min breaks Total No
2% Alnus glutinosa Feather 2x 175 - 250 RB 5 4
2% Betula pubescens Feather 2x 125 - 150 RB 2 4
3% Pinus sylvestris Feather 2x 125 - 150 RB 2 6
3% Quercus robur Feather 2x 125 - 150 RB 2 6
80% Transplants (2m centres)
20% Alnus glutinosa Transplant 1+1 60 - 80 RB 43
20% Betula pubescens Transplant 1+1 60 - 80 RB 43
10% Ilex aquifolium Transplant 1+1 40 - 60 3Lt pot 21
20% Quercus robur Transplant 1+1 60 - 80 RB 43
5% Sorbus aucuparia Transplant 1+1 60 - 80 RB 11
5% Crataegus monogyna Transplant 1+1 60 - 80 RB 11
10% Understorey (1.5m centres)
5% Corylus avellana Transplant 1+2 60 - 80 RB 3 19
2% Salix caprea Cell grown 0/1 40 - 60 100cc 8
3% Salix cinerea Cell grown 0/1 40 - 60 100cc 11
Mixed Hedge Planting Schedule
% MNH Species Form Age/ Size Height
cm
Root
Condition
Density
No. per lm Planting notes Total
30% Corylus avellana Transplant 1+1 80 - 100 BR 5 Double staggered
row 467
40% Crataegus
monogyna Transplant 1+2 80 - 100 BR 5 Double staggered
row 622
15% Prunus spinosa Branched 1+2 90 - 120 BR 5 Double staggered
row 233
15% Rosa canina Transplant 1+2 60 - 80 BR 5 Double staggered
row 233
Hedgerow trees
Ca Corylus avellana Feather (5x) -- 200 - 250 Root ball Root ball - 11
Cm Crataegus
monogyna Feather (5x) -- 200 - 250 Root ball Root ball - 8
Page 47 of 118

Page 48

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2026)
Formation of access road; erection of retaining wall
and fence and associated works.
Mavisbank Estate, Lasswade Road, Loanhead.
File No. 25/00306/DPP
Location 1
Scale 1:3000
Location 2
Location 3
Location 4
Page 48 of 118

Page 49

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
File No. 25/00306/DPP
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2026)
Formation of access road; erection of retaining wall
and fence and associated works.
Mavisbank Estate, Lasswade Road, Loanhead.
Scale 1:3000
Location 8
Location 7
Location 6
Location 5
Page 49 of 118

Page 50

N
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith, EH22 3AA
Reproduced from the Ordnance Survey map with the
permission of the controller of Her Majesty's Stationary Office.
Crown copyright reserved. Unauthorised reproduction infringes
Crown copyright and may lead to prosecution or civil
proceedings.
File No. 25/00306/DPP
Planning Service
Place Directorate
Midlothian Council Licence No. AC0000811376 (2026)
Formation of access road; erection of retaining wall
and fence and associated works.
Mavisbank Estate, Lasswade Road, Loanhead.
Scale 1:2500
Location 12
Location 11
Location 10
Location 9
Page 50 of 118

Page 51

 Around £7m of funding including a grant of over £5m from the National Heritage Memorial
Fund has been secured to cover the cost of resolving the legal issues around ownership, to
create a permanent access drive to the house and then deliver a first phase of works to
stabilise the building and prevent further loss.
 Midlothian Council has agreed to use its CPO powers to acquire the building before
transferring it to The Landmark Trust; this work is well underway and is expected to complete
over the next few months.
 The principle of acquiring the land necessary to create the new access drive is agreed with
the two land-owners.
 At the start of 2026 Midlothian Council granted planning permission for the works to the
house, paving the way for the project to finally progress after 50 years.
Our planning application for the new access drive will deliver the essential access required to
save Mavisbank house and thereafter provide a permanent means of access to the house. The
proposed route is informed by extensive research and community consultation and is
recommended for approval by the Council’s own case oƯicer. 
If we cannot secure planning permission for the access drive as proposed there are no other
viable alternatives and the rescue of Mavisbank will fail.
The aspiration is for the first phase of the project to be followed up by a second phase that
completes the restoration of the house and brings it back to life.  The access drive created during
phase one will be permanent and used as the access drive for the completed scheme. 
The route of the proposed access drive has been considered in depth many times over several
decades.  Currently there is no right of vehicular access to the house and this is one of the main
reasons why its restoration has never previously been achieved. The historic north and south
drives and parts of the east drive were sold to private owners many years ago which makes any
sort of meaningful vehicle access to the site impossible at present.  All the other potential options
Appendix 1 - Additional Information Requested by Committee
Saving Mavisbank
Planning Application to form a permanent new access drive ref: 25/00306/DPP
Supplemental note to accompany a site visit and Midlothian Council Planning Committee
meeting
February 2026
This note has been prepared following a request from the planning case oƯicer at Midlothian
Council for further information on three specific issues relating to the proposed access drive: 1)
details of alternative access routes that have been considered and discounted; 2) details of
community engagement; and, 3) details of managing risk to users of the Policies during
construction.  Each of these issues is addressed in turn below following a brief introduction.
Introduction
Mavisbank is internationally recognised as one of the most important and diƯicult heritage at risk
buildings in the UK. Its restoration will generate significant positive impacts for Midlothian in
terms of inward investment, job creation, skills training and place marketing which will create a
positive legacy for years to come.  Having been derelict since the 1970s and the subject of several
failed attempts, The Landmark Trust (the applicant) has now developed a funded and deliverable
project to rescue Category A Listed Mavisbank:
Page 51 of 118

Page 52

have been carefully considered but ultimately discounted on the basis of land ownership
constraints, technical feasibility or visual impact.  
1) Details of alternative access options including details of negotiations between the
applicant, the Council and landowners
As part of the feasibility work behind The Landmark Trust’s proposal it has revisited all the
previous analysis of diƯerent access options, undertaken its own technical analysis and
consulted directly with owners.  This includes reviewing analysis undertaken by Midlothian
Council itself in 2015 on a previous scheme that reached similar conclusions to ours.  The table
below presents the results of the analysis of all the potential access options but a summary of
the short-list of most apparent options is provided below for ease of reference: 
 North drive (1) (by Linden Lodge): The north drive is privately owned, runs right through a
private landholding and the owner is not willing to sell. There is no appetite to ask
Midlothian Council to seek to acquire the north drive via CPO anticipating that would be
contested and likely to jeopardise the CPO of the house
 South drive (2): The south drive is in several private ownerships and these owners are not
willing to sell.  There is no appetite to ask Midlothian Council to acquire the south drive
via CPO anticipating would be contested and likely to jeopardise the CPO of the house
 East drive (5): The part of the east drive that links onto Kevock Road is in private
ownership and Kevock Road is not suitable for construction vehicles.  The section of the
east drive immediately behind Kevock Road has also been subject to landslip and to
remedy this would have a significant landscape and visual impact and cost implications.
 Preferred option oƯ Wadingburn Road (4): Following negotiations over the last few years
both of the owners of land required to eƯect the preferred option have agreed in principle
to the scheme and land will be transferred by agreement without the need to use statutory
powers.  Funding from the National Heritage Memorial Fund is in place to facilitate this.
The proposed route was put forward by the local community as their preferred option
during a public consultation event in 2024.  The proposed route also makes use of much
of the remaining section of the east drive, minimising landscape and visual impact and
this has been recognised in the planning oƯicer’s report which recommends the
application for approval.
Page 52 of 118

Page 53

Access drive
option
Ownership / legal
considerations
Heritage impact
considerations
Physical feasibility Conclusion RAG
rating
1 
North Drive
(by Linden
Lodge)
 Private ownership
 Discussions with the owner
have taken place and the
owner is not willing to sell.
 CPO likely to generate
objection and therefore
discounted.
 Limited, it is an historic
access route.
 Category B Listed buildings
either side of the entrance
 Narrow entrance oƯ
Wadingburn Road with
historic gate piers and
residential lodge buildings
in close proximity may
require alteration.
Discounted due to private
ownership and poor physical
access particularly for
construction.
2 
South Drive
 Multiple private owners.
 Discussions with the
owners have taken place
and owners are opposed to
use of south drive for
access
 Mavisbank access rights
relate only to HES
maintaining the Policies and
not use of the house.
 CPO likely to generate
objection and therefore
discounted.
 Limited, it is an historic
access route.
 South Lodge is Category C
Listed
 Narrow entrance oƯ Polton
Road may require alteration
 Routes down to point of
access via Polton Bank or
Polton Bank are not suited
to construction vehicles.
 Route in to site crosses
several bridges and culverts
that could be problematic
for construction traƯic.
Discounted due to private
ownerships and poor physical
access, particularly for
construction vehicles.
3 
East Drive
(via the
eastern side
of the arable
field, oƯ
Wadingburn
Road)
 Private ownership (field oƯ
Wadingburn Road) &
Scottish Government
ownership (the Policies).
 Owners agreed in principle
to facilitating access and
negotiations are advanced.
 The route through the
Policies utilises part of the
historic access route which
is still in place.  This
concept is supported by the
Conservation Management
Plan for Mavisbank Policies.
 Technical design indicates
that this route may be
physically feasible but
would require significant
intrusive engineering to an
span area of land-slip to the
east of the Policies below
the Doocot.
Discounted due to community
feedback at public consultation
and the technical and legal
challenges of spanning a
section of Scottish Government
land that is subject to historic
and ongoing land-slip unlikely to
be able to be overcome to the
satisfaction of HES.
4  Private ownership (field oƯ
Wadingburn Road) &
 Planning application
recommended for approval.
 Technical design indicates
that this route is physically
Preferred option due to several
factors:
Page 53 of 118

Page 54

East Drive
(via the
western side
of the arable
field, oƯ
Wadingburn
Road)
Scottish Government
ownership (the Policies)
 Owners agreed in principle
to facilitating access and
negotiations are advanced.
 Utilises part of the historic
access route, supported by
the adopted Conservation
Management Plan.
 Local consultation
indicated support for this
option as the preferred
route.
feasible, significantly lower
risk and lower landscape /
visual impact than seeking
to reinstate the full length of
the east drive or accessing
through the ‘Pony Field’.
 Funding in place.
 Historical integrity using
large part of remaining East
Drive
 Agreements in place with
relevant landowners.
 Planning application
recommended for approval.
 Community support.
5
East Drive
(via Kevock
Road and
existing
pedestrian
access to
Policies)
 Partly in private ownership.
 One owner known to be
unwilling to facilitate this
access option.
 Original historic access
point on Kevock Road has
been built on with modern
residential
 Remainder of the route
would follow the historic
access route supported by
the adopted Conservation
Management Plan.
 Kevock Road is a residential
street, very narrow in places
unsuitable for construction
vehicles and is considered
not feasible
 Technical design indicates
that once inside the Policies
this route may be physically
feasible but would require
significant intrusive
engineering to span area of
land-slip.
Discounted due to access for
construction vehicles via
Kevock Road not being feasible
and private ownership. Previous
community feedback to a
similar alternative was opposed
and the technical and legal
challenges of spanning a
section of Scottish Ministers
land that is subject to historic
and ongoing land-slip are
unlikely to be able to be
overcome to the satisfaction of
HES.
6
Via the ‘Pony
Field’, oƯ
Wadingburn
Road
(Mavisbank
Trust 2014
proposal)
 Private ownership
 Owner was willing at that
time of the Mavisbank Trust
proposal in 2014 to
facilitate access.
 Significant negative impact
– HES expressed concern
about the negative impact
on the designed landscape
and indicated that they
would object to the
previous Mavisbank Trust
proposal.
 Work undertaken by the
Mavisbank Trust indicated
that this route may be
physically feasible.
Discounted due to high visual
and landscape impact and risk
of objection from HES based on
previous scheme.
7
Via Braeside
Road
 Unadopted private
residential cul-de-sac.
 Significant negative impact
where the route would
descend down through the
Policies leading to risk of
 Potentially unfeasible due
to level change/topography.
Discounted due to private
ownership and risk of statutory
objection.
Page 54 of 118

Page 55

objection from statutory
agencies.
8
Via Polton
Road/Hoggan
Way
 Private ownerships between
the public highway and
Mavisbank house.
 Negative impact where the
route would enter the
Policies leading to risk of
objection from statutory
agencies.
 Unclear how the route
would reach Mavisbank
House without forming a
link to the North Drive due
to topography. North Drive
is also in private ownership
Discounted due to private
ownership and risk of statutory
objection.
9
Via
Arbuthnot
Road
 Private ownerships between
the public highway and
Mavisbank house.
 Negative impact where the
route would enter the
Policies leading to risk of
objection from statutory
agencies.
 Arbuthnot Road is a quiet
residential cul-de-sac,
narrow in places unsuitable
for construction vehicles.
Discounted due to private
ownership and risk of statutory
objection.
Page 55 of 118

Page 56

Page 56 of 118

Page 57

2) Details of community engagement undertaken
A well-attended public consultation event was held in 2025 in Loanhead to discuss the access
drive proposals with the surrounding community and inform the planning application.  Option 3,
shown in the plan above, was initially proposed and would have created a link from the
Wadingburn Road along the eastern edge of the adjoining arable field before linking up to the old
East Drive just behind Kevock Road.  The route sought to reinstate the historic East Drive which is
partially intact in order to minimise landscape and visual impact and maximise heritage integrity. 
During the consultation, the local community raised concerns about the proximity of the
proposed route to Kevock Road and the fact that it would need to span an area of the Policies for
around 75 metres that has been subject to land slip.  The community put forward an alternative
as their preferred option along the western edge of the same arable field and this community-led
proposal formed the basis of the access drive route set out in the planning application (option 4
in the plan above). 
The community were subsequently updated on progress with the project and the decision to
revise the proposed access route as they suggested and this was met with positive support.  We
consider that this exercise shows the value of public consultation and how community feedback
has heavily informed the current proposal.
The proposed access route was also informally tested with several of the statutory agencies
including Historic Environment Scotland, and local stakeholder organisations such as the
Mavisbank Trust as part of a pre-application consultation process during 2025.  All parties
consulted confirmed their in-principle support for the proposed route this is reflected in their
formal responses to the planning application.
More broadly The Landmark Trust has issued several press releases and newsletters over the last
few years to subscribers who have expressed an interest in the project.  At this more general level
the purpose of the exercise is to keep people up to date with major project milestones such as
securing funding and the award of planning permission for works to Mavisbank House at the start
of 2026.
3) Details of traƯic management to manage the mix of construction traƯic and walkers etc.
Please see the plan below showing the proposed traƯic management relating to construction
traƯic and pedestrian use of the wider area and indicating:
 Contractor temporary Heras fencing to separate the works area from public access.
 Use of existing field boundary fences where existing/appropriate.
 Provision of signage at key locations to indicate alternative routes for
pedestrians/walkers.
 Managed crossing arrangement for a works area crossing point with options for this to be
controlled by on-demand lighting and/or banksmen
 Option for crossing point to be left open outside of contract working hours and with the
works area secured.
 Noted that HES manage the eastern extent of the East Drive in areas of known land slip
and within areas outwith the proposed works area.
 In addition, the appointed contractor will prepare his operation specific RAMS (Risk
Assessment Method Statements) for managing pedestrian movements in the vicinity of
Page 57 of 118

Page 58

the works and in accordance with relevant Health and Safety legislation, including the
CDM Regulations (Construction, Design and Management Regulations).
Page 58 of 118

Page 59

Page 59 of 118

Page 60

Page 60 of 118

Page 61

Best wishes
Ross
Ross Ingham MPhil, MIED
Director
INGHAM PINNOCK ASSOCIATES
T:
E:
W: www.inghampinnock.com
Ingham Pinnock Associates Limited. Registered in England under number 8052305.
Registered Address: Yew Tree House, Westwell Leacon, Charing, Ashford, Kent. TN27 0EE
The information contained in this e mail is confidential and for the use of the addressee only; it may also be legally privileged.  Any disclosure, use or copying of the
information by anyone other than the intended recipient is prohibited and may be illegal.  If you have received this message in error, please notify us immediately by
return e mail or call + 44(0) 797 436 3991 and ask for the sender.
Ingham Pinnock Associates Limited has taken every reasonable precaution to ensure that any attachment to this e mail has been checked for viruses.  However, it
cannot accept liability for any damage sustained as a result of software viruses and would advise that you carry out your own virus checks before opening it and any
attachment.
From: Whitney Lindsay <whitney.lindsay@midlothian.gov.uk>
Sent: 31 March 2026 17:10
To: Ross Ingham
Cc:
Subject: RE: Mavisbank
Evening Ross,
I trust all is well with you.
I just wanted to follow up on the community engagement that was undertaken. Could you
clarify/advise of the following, please:
Date/time/location of community event in Loanhead; and
Details of how the event was advertised/publicised.
Should you have any further questions, please do not hesitate to get in contact.
Kind regards,
Whitney
Whitney Lindsay
Page 61 of 118

Page 62

Page 62 of 118

Page 63

Ross Ingham MPhil, MIED
Director
INGHAM PINNOCK ASSOCIATES
T:
E:
W: www.inghampinnock.com
Ingham Pinnock Associates Limited. Registered in England under number 8052305.
Registered Address: Yew Tree House, Westwell Leacon, Charing, Ashford, Kent. TN27 0EE
The information contained in this e mail is confidential and for the use of the addressee only; it may also be legally privileged.  Any disclosure, use or copying of the
information by anyone other than the intended recipient is prohibited and may be illegal.  If you have received this message in error, please notify us immediately by
return e mail or call + 44(0) 797 436 3991 and ask for the sender.
Ingham Pinnock Associates Limited has taken every reasonable precaution to ensure that any attachment to this e mail has been checked for viruses.  However, it
cannot accept liability for any damage sustained as a result of software viruses and would advise that you carry out your own virus checks before opening it and any
attachment.
From: Whitney Lindsay <whitney.lindsay@midlothian.gov.uk>
Sent: 21 January 2026 11:20
To:
Cc: Ross Ingham
Subject: RE: Mavisbank
Good morning Nikki,
The above planning application was presented to the Planning Committee yesterday and I
can advise that the Committee deferred the application for a site visit and to secure the
following information:
Details of the alternative access options including details of negotiations between
applicant, the Council and landowners.
Details of the community engagement undertaken.
Details of traffic management to manage the mix of construction traffic and walkers
etc.
Ross provided the attached table outlining the problems with the other access routes prior
to the Planning Committee – it would be of assistance to expand on this and perhaps
include an annotated plan showing each alternative route to correspond with the table.
If you could provide the above additional information within the next 2 weeks it would be
appreciated. The next date for planning committee is the 9 March 2026.
Should you have any further questions, please do not hesitate to get in contact.
Kind regards,
Whitney
Page 63 of 118

Page 64

Whitney Lindsay
Planning Officer
Planning, Sustainable Growth and Investment Service
Place Directorate
Midlothian Council
Fairfield House
8 Lothian Road
Dalkeith
EH22 3AA
whitney.lindsay@midlothian.gov.uk
We are reviewing the Midlothian Local Development Plan Midlothian Local
Development Plan 2 | Development plans and policies | Midlothian Council
If you have any questions about the review, or would like to be added to our
MLDP2 mailing list, please email LDP@midlothian.gov.uk
The information contained in this message may be confidential or legally
privileged and is intended for the addressee only.
If you have received this message in error or there are any problems please
notify the originator immediately.
If you are not the intended recipient you should not use, disclose,
distribute, copy, print, or reply on this e-mail.
All communication sent to or from Midlothian Council may be subject
to recording and/or monitoring in accordance with relevant legislation.
The information contained in this message may be confidential or legally
privileged and is intended for the addressee only.
If you have received this message in error or there are any problems please
notify the originator immediately.
If you are not the intended recipient you should not use, disclose,
distribute, copy, print, or reply on this e-mail.
All communication sent to or from Midlothian Council may be subject
to recording and/or monitoring in accordance with relevant legislation.
Page 64 of 118

Page 65

Page 65 of 118

Page 66

Page 66 of 118

Page 67

PLANNING COMMITTEE
TUESDAY 28 APRIL 2026
ITEM NO 5.3
APROVAL OF MATTERS SPECIFIED IN CONDITIONS 4, 5, 6, 8, 9, 10 AND
20 ATTACHED TO PLANNING PERMISSION 20/00151/PPP (RELATING
TO SITE INFRASTRUCTURE) AT HOPEFIELD FARM 2, ROSEWELL
ROAD, BONNYRIGG.
Report by Chief Officer Place
1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION
1.1 The application is for the approval of matters specified in
conditions 4, 5, 6, 8, 9, 10 and 20 attached to planning permission
20/00151/PPP (relating to site infrastructure – roads, landscaping
matters, ecology matters, drainage details and noise mitigation
measures) at Hopefield Farm 2, Bonnyrigg. There have been no
letters of representation. There have been consultation responses
received from the Scottish Environment Protection Agency
(SEPA), the Council’s Senior Manager Neighbourhood Services
(Roads and Flooding) and the Council’s Senior Manager
Protective Services. 
1.2 The relevant development plan policies are 1, 2, 3, 5, 6, 13, 14, 15,
18, 22, 23 and 24 of the National Planning Framework 4 (NPF4)
and STRAT3, DEV2, DEV5, DEV6, DEV7, DEV9, TRAN1, TRAN2,
TRAN5, ENV2, ENV4, ENV7, ENV9 ENV10, ENV11, ENV14, ENV15,
ENV17, ENV18, IMP1, IMP2 and IMP3 of the Midlothian Local
Development Plan 2017 (MLDP).
1.3 The recommendation is to approve the condition submissions
except conditions 4. xiii, 5. iii, 5. v, 5. vi, 5. vii, 5. x and 6. 
2 LOCATION AND SITE DESCRIPTION
2.1 The application site is located at the southwestern corner of Bonnyrigg,
approximately 1.2 km from the Bonnyrigg town centre.
2.2 The application site comprises a series of agricultural fields measuring
57.3 hectares located to the east and west of Little Wood, an
established plantation woodland that bisects the application site. A
series of hedgerows align the field boundaries with more mature
hedgerow edges along most of the site boundaries and juvenile
landscape bunds along the northeast corner associated with the
Hopefield Estate.  The Pittendreich Burn also runs through the site,
Page 67 of 118

Page 68

flowing north through Little Wood. The site falls gently to the east with
the western areas representing the highest and most prominent parts
of the site.
2.3 A series of pedestrian and cycle path networks also bisect the site.
This includes Core Path 6-42 (which also forms part of the National
Cycle Network NCN 196 connecting Penicuik to Musselburgh) which
runs north south through the site. Core Path 6-35 also crosses the
central part of the site, which currently comprises an existing bridleway
that forms part of the Tyne Esk Trail.
2.4 An existing vehicular access to the site is provided via Rosewell Road
– which facilitates access to the agricultural fields, existing residential
properties (i.e. Dalhousie Chesters Court) and a rear access lane for
properties facing Rosewell Road.
2.5 The site also includes a small, separate linear parcel of land running
directly adjacent to the B6392, which connects the existing bridleway
bridge to an existing footpath at the site’s southeastern corner.
2.6 The site excludes the Dalhousie Chesters Farm Buildings and all
residential properties within Dalhousie Chesters and Dalhousie
Chesters Court.
2.7 The site is bounded by residential properties within Cockpen Crescent
to the north and properties associated with the existing Hopefield
residential estate, namely Castell Maynes Crescent, Castell Maynes
Avenue, Bannockrigg Terrace and Bannockrigg Road. Rosewell Road
abuts the site’s western boundary of the site with a series of residential
properties, a ‘coachworks’ vehicle repair facility and landscaped area.
To the north, across Rosewell Road, lies the Lasswade RFC and
playing fields associated with Polton Recreation Ground.  Sports
playing fields are also located to the east of the site (off Bannockrigg
Road) in addition to land allocated for employment use (Site e16)
within the MLDP.  Land under the control of the Crown Estate (and
allocated for housing) directly abuts the site’s eastern corner until it
meets the B6392. Further south and east lie agricultural fields.
2.8 The wider area is characterised by a range of agricultural fields, the
river corridor and woodland associated with the Dalhousie Burn and a
series of post-war housing and more recent housing developments of
varied architectural style and character.  Bonnyrigg Town Centre also
provides a range of retail, commercial, leisure and educational
facilities.
3 PROPOSAL
3.1 Matters Specified in Conditions (MSC) applications are submitted by
applicants to discharge specific conditions imposed on a grant of
Planning Permission in Principle (PPP).  In this case application
25/00155/MSC seeks to discharge conditions attached to planning
Page 68 of 118

Page 69

permission in principle 20/00151/PPP for residential development,
community facilities, primary school and associated works on land at
Hopefield Farm 2 (it being an extension to the original residential
development at Hopefield Farm). The full technical details of the
condition submissions are attached to this report as Appendix A (the
plans listed are available on the online case file).
3.2 The application submission seeks to discharge the conditions relating
to the initial infrastructure works across the whole site, to enable the
housing development to be delivered.  This includes the proposed
spine roads, paths, cycle routes, sustainable urban drainage system
(SUDS), acoustic bunding, play areas, ecological measures, and
associated landscaping.  Further MSC applications, for each
phase/pod or development area, will provide details of the internal
roads which will connect to the junctions along with all other associated
details required for that phase of development. 
3.3 Condition 3 of application 20/00151/PPP requires that the applicant
submits details, through a MSC application, of the phasing of the
development. The phasing of the development has been approved and
a brief breakdown of the phasing for the development is as follows
(note - there may be some slippage with the timescales): 
• Phase 1a works commenced in 2025 by means of grouting
works and construction of the roundabout at Rosewell Road.
• Phase 1b, 1c and 1d were due to commence early 2026 and
comprise of ground stabilisation and remediation of the site and
the formation of the acoustic bunding and associated
landscaping to the western half of the site.
• Phase 2 was due to commence early 2026 and comprises of
site infrastructure including the formation of the access at
Castell Maynes Avenue and the main roads, SUDS, drainage
and services to the western half of the site.
• Phase 3 is due to commence mid-2026 and comprises of the
infrastructure planting to the western half of the site.
• Phase 4 is due to commence late 2026/early 2027 comprising of
the off-site transport improvements.
• Phases 5a, 5b and 5c are due to commence mid 2026
comprising of the construction of the residential pods and
associated landscaping and open space to the western half of
the site and will move from the north of the site to the south.
• Phase 6 is due to commence mid-2026 comprising of the
acoustic bunding to the eastern half of the site;
• Phase 7 is due to commence early 2027 comprising of the
landscaping to the acoustic bunding.
• Phase 8 is due to commence mid-2026 comprises of site
infrastructure to the eastern half of the site including access at
Bannockrigg Road and the southern roundabout, the roads,
SUDS, drainage, services and off-site footpath connections on
B6392.
Page 69 of 118

Page 70

• Phase 9 is due to commence late 2027/early 2028 and
comprises of the landscaping for the infrastructure and SUDS to
the eastern half of the site;
• Phase 10 is due to commence early 2028 and relates to the
works at Dalhousie Chesters Park.
• Phase 11 is due to commence mid/late 2028 and relates to the
community growing facilities.
• Phases 12a and 12b are to commence early 2028 and relate to
the construction of residential housing pods including the
affordable housing and associated landscaping and open space
to the western half of the site; and,
• Phases 13a, 13b, 13c, 13d, 13e and 13f are to commence mid-
2029 and relate to the construction of residential housing pods
including the affordable housing and associated landscaping
and open space to the eastern half of the site.
3.4 The current MSC application seeks to discharge the following
conditions attached to the planning permission 20/00151/PPP (to assist
those conditions/part of conditions in italics are recommended not to be
approved): 
Condition 4 - Roads
3.5 4. Development shall not begin on an individual phase of development
(identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the
site access, roads, footpaths, cycle ways and transportation
movements has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme, including a
programme for completion, shall include:
i. existing and finished ground levels for all roads, footways and
multi-user paths/cycle ways in relation to a fixed datum;
ii. the proposed vehicular, cycle and pedestrian accesses into the
site;
iii. the proposed roads, footways and turning facilities designed to
an adoptable standard) and multi-user paths/ cycle ways
including suitable walking and cycling routes;
iv. details, including cross sections, of any
roads/footpaths/cyclepaths crossing Little Wood to show the
carriageway, footpath/multiuser path, services, verges, tree
planting, tree protection, landscape planting
embankments/gradients and working areas;
v. proposed visibility splays, traffic calming measures, lighting and
signage;
vi. proposed residents and visitor car parking arrangements to meet
the Council’s Parking Standards;
vii. proposed cycle parking/storage facilities;
viii. proposed connections to Core Paths;
Page 70 of 118

Page 71

ix. proposed alignment, surface materials, widths and verge details
for Core Path realignments and any upgrades;
x. The new bus loop road linking the stub end at Bannockrigg Road
with Castell Maynes Avenue formed to a minimum width of at
least 6.5m wide with details and locations of bus stops and
shelters along the route;
xi. Details of the proposed roundabout on the B6392;
xii. Details of the proposed roundabout on Rosewell Road;
xiii. Details of proposed off-site improvements to the local road
network identified in Chapter 4 of the Transport Assessment and
the EIA Schedule of Mitigation (Traffic & Transport Section);
xiv. The section of core path (National Cycle Route 196) within the
site increased in width to a minimum of 4.0m width where
practical;
xv. Details of a traffic signal controlled crossing to upgrade the
existing informal pedestrian/equestrian crossing of the B6392;
xvi. Resident and visitor parking to meet current council standards;
xvii. Details of the provision and use of electric vehicle charging
stations throughout the development;
xviii. Details of a Travel Plan document (travel pack) for residents;
and,
xix. a programme for completion for the construction of road
improvements, accesses, roads, footpaths, cycle paths and
associated works.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be agreed in writing with
the planning authority.
Reason: To ensure the future users of the buildings, existing local
residents and those visiting the development site during the
construction process have safe and convenient access to and from the
site. Also to ensure that a network of electric vehicle chargers is
provided in line with Policy TRAN 5 of the Midlothian Local
Development Plan 2017and Policy 13 of NPF4.
Condition 5 – Hard and Soft Landscaping
3.4 5. Development shall not begin on an individual phase of development
(identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and
soft landscaping works has been submitted to and approved in writing
by the planning authority for each phase. Details of the scheme shall
include:
i. existing and finished ground levels and floor levels for all
buildings and roads in relation to a fixed datum;
ii. existing trees, landscaping features and vegetation to be
retained; removed, protected during development and in the
case of damage, restored;
Page 71 of 118

Page 72

iii. proposed new planting in communal areas and open space,
including trees, shrubs, hedging and grassed areas ;
iv. substantial new planting, structure planting and screening
planting required in accordance with the EIA Schedule of
Mitigation;
v. location and design of any proposed walls, fences and gates,
including those surrounding bin stores or any other ancillary
structures;
vi. schedule of plants to comprise species, plant sizes and
proposed numbers/density;
vii. programme for completion and subsequent maintenance of all
soft and hard landscaping. The landscaping in the open spaces
shall be completed prior to the houses on adjoining plots are
occupied;
viii. proposed car park configuration and surfacing;
ix. proposed footpaths and cycle paths (designed to be unsuitable
for motor bike use);
x. proposed areas of open space, linear parks/green corridors, play
areas (including equipped play areas, informal kick about areas,
informal open space and natural play areas). Additional areas of
open space shall also be provided within the south-eastern
corner of the site and pockets of open space areas adjacent to
core paths, cyclepaths and multi-user paths;
xi. proposed cycle parking facilities;
xii. proposed area of improved quality (minimum of 20% of the
proposed dwellings);
xiii. construction details for landscape elements and planting, fencing
with mammal passage points, woodland planting mix, habitat
features,
xiv. cross sections of bunds, woodland buffer planting and acoustic
fencing
xv. specifications for roadside planting and drainage features
including cross sections of roads, footpaths, drainage swales
and utilities with adequate rooting volume for street trees;
xvi. ecological enhancements identified within the EIA Report or any
repeat surveys shown on the corresponding detailed landscape
plans;
xvii. green network arrangements showing alignment, widths,
footpaths, verges and planting;
xviii. Tree root protection areas, construction exclusion zones and
dwelling standoffs overlaid corresponding detailed landscape
plans; and
xix. visual mitigation, including retained landscape and bunding
elements within the EIA schedule of mitigation
All hard and soft landscaping shall be carried out in accordance with
the scheme approved in writing by the planning authority as the
programme for completion and subsequent maintenance (vii).
Page 72 of 118

Page 73

Thereafter any trees or shrubs removed, dying, becoming seriously
diseased or damaged within five years of planting shall be replaced in
the following planting season by trees/shrubs of a similar species to
those originally required.
Reason: To ensure the quality of the development is enhanced by
landscaping to reflect its setting in accordance with policies DEV2,
DEV5, DEV6, DEV7 and DEV9 of the Midlothian Local Development
Plan 2017 and national planning guidance and advice and Policies 6
and 14 of NPF4.
Condition 6 – Design Matters
3.5 6. Development shall not begin on an individual phase of development
(identified in compliance with condition 3) until an application for
approval of matters specified in conditions for the siting, design and
external appearance of all residential units and other structures has
been submitted to and approved in writing by the planning authority for
each phase. The application shall include samples of materials to be
used on external surfaces of the buildings; hard ground cover surfaces;
means of enclosure and ancillary structures. These materials will also
include those proposed in the area of improved quality (20% of the total
number of proposed dwellings and not any community/education
areas). Development shall thereafter be carried out using the approved
materials or such alternatives as may be agreed in writing with the
planning authority.
Reason: To ensure the quality of the development is enhanced by the
use of quality materials to reflect its setting in accordance with policies
DEV2, DEV5 and DEV6 of the Midlothian Local Development Plan
2017 and Policy 16 of NPF4 and national planning guidance and
advice.
Condition 8 – Ecology Matters
3.6 8. Development shall not begin on an individual phase of development
(identified in compliance with condition 3) until an application for
approval of matters specified in conditions for a Landscape and Habitat
Management Plan responding to the ecological recommendations,
findings and mitigation measure within the EIA Report (Technical
Appendix 6 - Ecology) and in response to any repeat protected species
surveys (prepared no more than 12 months in advance of any
application submission) has been submitted to and approved by the
planning authority. The details shall include:
i. Pre-construction, construction phase and operational phase
measures to translate mitigation measures into the design;
ii. retention, protection and restoration proposals for of
Pittendreich Burn;
iii. Proposed measures to minimise human interference to the
southern part of Little Wood;
Page 73 of 118

Page 74

iv. The quantum, locations and areas for habitat features and
details where these features are constructed or proprietary
features;
v. Species Protection Plans for protected species identified in the
surveys of protected species or repeat surveys for protected
species;
vi. Measures to mitigate non-native species;
vii. Ecological mitigation measures identified within the EIA
Schedule of Mitigation (Ecology Section) for corresponding
species.
This document should feed directly into working method statements,
protection plans, detailed design and layout for all elements of the
design and site layout including lighting proposals and SUDS as well
as landscape proposals and man-made habitat features. Development
shall thereafter be carried out in accordance with the approved details
or such alternatives as may be agreed in writing with the planning
authority.
Reason: To ensure the development accords with the requirements of
policy DEV5 of the Midlothian Local Development Plan 2017 and Policy
3 of NPF4.
Condition 9 – Tree and Hedge Protection
3.7 9. Development shall not begin on an individual phase of development
(identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of Tree,
Woodland and Hedgerow Retention and Protection Plan for the
corresponding phase has been submitted to and approved in writing by
the planning authority. Details of the scheme shall include:
i. root protection areas and construction exclusion zones;
ii. dwelling standoff distances of 20m from the corresponding
boundary fence to Little Wood and between 10–15m from
individual retained trees on the foot/cycleway.
Protection and stand-off measures shall also be shown on
corresponding landscape plans. Development shall thereafter be
carried out in accordance with the approved details or such alternatives
as may be agreed in writing with the planning authority.
Reason: To ensure the development accords with the requirements of
policy DEV5 of the Midlothian Local Development Plan 2017 and Policy
6 of NPF4.
Condition 10 – Drainage Matters
3.8 10. Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an
application for approval of matters specified in conditions for a scheme
Page 74 of 118

Page 75

of effective drainage and flood management for each phase has been
submitted to and approved in writing by the planning authority in
consultation with SEPA. Details of the scheme shall include:
i. Drainage and surface water management arrangements to
manage surface water runoff including a ‘wet’ sustainable urban
drainage system pond(s);
ii. Measures identified within the EIA Schedule of Mitigation
(Hydrology & Hydrogeology Section);
iii. Details of the proposed culvert crossing point and mammal
passage;
iv. Finished floor levels of residential properties incorporating a
freeboard of 0.3m where necessary;
v. Finished floor levels of the primary school to be raised above the
1 in 1000-year (including 20% blockage) flood level;
vi. All built development, including SUDS and any land raising to be
outwith the 1 in 200 year plus blockage scenario flood level; and
vii. No built development over the existing culverted watercourse
along the southern boundary and a buffer maintained.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be agreed in writing with
the planning authority.
Reason: The planning application is in principle and the details
required are to ensure the surface water from the site can be
appropriately treated and to ensure that levels on the site are
appropriate in relation to flood risk and to ensure biodiversity
enhancement associated with such infrastructure.
Condition 20 – Noise Mitigation
3.9 20. Development shall not begin on any individual phase of
development (identified in compliance with Condition 3) until an
application for approval of matters specified in conditions, for separate
scheme(s) to deal with noise mitigation / attenuation from commercial
and traffic noise. This shall include the submission and approval of
updated noise impact assessments for corresponding phases to
provide details of stand-off distances, acoustic bunds, acoustic fencing
and any other attenuation measures (including but not limited to
glazing, insulation, building fabric, mechanical ventilation & heat
recovery in accordance with Table 4 of BS 8233:2014) to address the
noise mitigation principles within the EIA Technical Appendix 7 -
Environmental Noise Impact Assessment and EIA Schedule of
Mitigation (Noise Section), updated to accord with the following:
i. Daytime noise levels from commercial industrial uses (7:00am to
7:00pm), from an assessment position 3.5 meters from the
facade of any residential property (1m from the façade in the
case of the upper floors), shall not exceed the background noise
level by more than 5dB when rated in accordance with
Page 75 of 118

Page 76

BS4142:+A1:2019: Methods for rating and assessing industrial
and commercial sound;
ii. Noise arising from the night time delivery of crash vehicles to the
existing commercial use (Coachworks) on Rosewell Road
(11:00pm to 7:00am) at any new residential property with
windows open shall not exceed the background noise level by
more than 9dB when rated in accordance with
BS4142:+A1:2019: Methods for rating and assessing industrial
and commercial sound;
iii. Road Traffic Noise shall comply with the criteria for daytime
external garden amenity at 55dB Laeq (16hour) with updated
mitigation measures, as necessary.
Development shall thereafter be carried out in accordance with the
approved details or such alternatives as may be approved in writing
with the planning authority. Any recommended noise mitigation
measures shall be implemented prior to the occupation of the
dwellinghouses.
Reason: To protect residential amenity and minimise unacceptable
noise impacts to future residents.
3.10 The application submission was accompanied by a condition matrix, a
range of engineering drawings, site layout drawings, landscaping
drawings, noise mitigation technical details and supporting
documentation regarding roads, drainage, landscaping, ecological
enhancements and noise mitigation.
4 BACKGROUND
4.1 17/00706/SCO - Environmental Impact Assessment (EIA) Scoping
Opinion Request for residential development, community facilities
including primary school, open space and infrastructure. Confirmation
on the level of information required to be included within the EIA Report
was confirmed on 1 November 2017.
4.2 20/00151/PPP - Application for planning permission in principle for
residential development; community facilities, primary school and
associated works (this application is accompanied by an environmental
impact assessment report submitted under the terms of the Town and
Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017 was granted by the Committee at its meeting of April
2021 subject to the conclusion of a planning obligation to secure
developer contributions (the permission was issued on the 10 February
2025).
4.3 25/00249/MSC – Approval of matters specified in condition 7 attached
to planning permission 20/00151/PPP (relating to woodland
management and landscaping). Approved January 2026.
Page 76 of 118

Page 77

4.4 25/00383/MSC - Approval of matters specified in condition 3 attached
to planning permission 20/00151/PPP (relating to phasing). Approved
January 2026.
4.5 25/00108/MSC - Approval of matters specified in conditions 11,13 and
18 (relating to archaeology, ground contamination and the provision of
a construction environment management plan) attached to planning
permission 20/00151/PPP. Currently pending consideration. 
4.6 25/00199/MSC - Approval of matters specified in conditions 4, 5, 6, 10,
15 and 20 attached to planning permission 20/00151/PPP (relating to
the detailed layout of phase/pod one – 363 residential units). Currently
pending consideration. 
4.7 Councillor Milligan ‘called in’ the application to be determined by
Committee to give consideration to transportation matters (bus routes)
and structural landscaping along Rosewell Road. 
5 CONSULTATIONS
5.1 The Scottish Environment Protection Agency (SEPA) does not
object to the application and confirms the drainage proposals are
acceptable.
5.2 The Council’s Senior Manager Neighbourhood Services (Roads
and Flooding) does not object to the application.  There are however
some outstanding roads issues which means condition 4 can’t be
discharged in its entirety.  The site-wide drainage strategy and SUDS
proposals were assessed for flood risk using bespoke modelling
(including climate change and blockage considerations) and is
considered acceptable.  It is noted that whilst finished floor levels are
not explicitly mapped, the Flood Risk Assessment (FRA) sets out
appropriate principles for locating development outwith flood risk areas.
5.3 The Council’s Senior Manager Protective Services Manager does
not object to the application and confirmed that they are satisfied that
the submitted review of noise mitigation measures demonstrates
compliance with Condition 20.
6 REPRESENTATIONS
6.1 No representations have been received.
7 PLANNING POLICY
7.1 The development plan is comprised of National Planning Framework 4
(2023) and the Midlothian Local Development Plan 2017. The following
policies are relevant to the proposal:
Page 77 of 118

Page 78

National Planning Framework 4 (NPF4)
7.2 Policy 1 Tackling the climate and nature crises; sets out to
encourage, promote and facilitate development that addresses the
global climate emergency and nature crisis.
7.3 Policy 2 Climate mitigation and adaptation; sets out to encourage,
promote and facilitate development that minimises emissions and
adapts to the current and future impacts of climate change.
7.4 Policy 3 Biodiversity; sets out to protect biodiversity, reverse
biodiversity loss, deliver positive effects from development and
strengthen nature networks.
7.5 Policy 5 Soils; sets out to protect carbon-rich soils, restore peatlands
and minimise disturbance to soils from development. The policy also
sets out acceptable scenarios for development on prime agricultural
land.
7.6 Policy 6 Forestry, woodland and trees; sets out to protect and
expand forests, woodland and trees.
7.7 Policy 13 Sustainable Transport; sets out to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and
public transport for everyday travel and reduce the need to travel
unsustainably.
7.8 Policy 14 Design, quality and place; sets out to encourage, promote
and facilitate well designed development that makes successful places
by taking a design-led approach and applying the Place Principle.
7.9 Policy 15 Local Living and 20-minute neighbourhoods; sets out to
encourage, promote and facilitate the application of the Place Principle
and create connected and compact neighbourhoods where people can
meet the majority of their daily needs within a reasonable distance of
their home, preferably by walking, wheeling or cycling or using
sustainable transport options.
7.10 Policy 18 Infrastructure first; sets out to encourage, promote and
facilitate an infrastructure first approach to land use planning, which
puts infrastructure considerations at the heart of placemaking.
7.11 Policy 22 Flood risk and water management; sets out to strengthen
resilience to flood risk by promoting avoidance as a first principle and
reducing the vulnerability of existing and future development to
flooding.
7.12 Policy 23 Health and Safety; sets out to protect people and places
from environmental harm, mitigate risks arising from safety hazards and
encourage, promote and facilitate development that improves health and
wellbeing. 
Page 78 of 118

Page 79

7.13 Policy 24 Digital Infrastructure; sets out to encourage, promote and
facilitate the rollout of digital infrastructure across Scotland to unlock
the potential of all our places and the economy.
Midlothian Local Development Plan (MLDP)
7.14 Policy STRAT3: Strategic Housing Land Allocations states that
strategic land allocations identified in the plan will be supported
provided they accord with all other policies. 
7.15 Policy DEV2: Protecting Amenity within the Built-Up Area states
that development will not be permitted where it would have an adverse
impact on the character or amenity of a built-up area.
7.16 Policy DEV5: Sustainability in New Development sets out the
requirements for development with regards to sustainability principles.
7.17 Policy DEV6: Layout and Design of New Development states that
good design and a high quality of architecture will be required in the
overall layout of development proposals. This also provides guidance
on design principles for development, materials, access, and passive
energy gain, positioning of buildings, open and private amenity space
provision and parking.
7.18 Policy DEV7: Landscaping in New Development requires
development proposals to be accompanied by a comprehensive
scheme of landscaping. The design of the scheme is to be informed by
the results of an appropriately detailed landscape assessment.
7.19 Policy DEV9: Open Space Standards requires that the Council
assess applications for new development against set open space
standards and seeks an appropriate solution where there is an
identified deficiency in quality, quantity and/or accessibility.
7.20 Policy TRAN1: Sustainable Travel aims to encourage sustainable
modes of travel.
7.21 Policy TRAN2: Transport Network Interventions highlights the
various transport interventions required across the Council area,
including the A701 realignment.
7.22 Policy TRAN5: Electric Vehicle Charging seeks to promote a
network of electric vehicle charging stations by requiring provision to be
an integral part of any new development.
7.23 Policy ENV2: Midlothian Green Networks supports development
proposals brought forward in line with the provisions of the Plan that
Page 79 of 118

Page 80

help to deliver the green network opportunities identified in the
Supplementary Guidance on the Midlothian Green Network.
7.24 Policy ENV4: Prime Agricultural Land does not permit development
that would lead to the permanent loss of prime agricultural land unless
there is appropriate justification to do so.
7.25 Policy ENV7: Landscape Character states that development will not
be permitted where it significantly and adversely affects local
landscape character. Where development is acceptable, it should
respect such character and be compatible in terms of scale, siting and
design. New development will normally be required to incorporate
proposals to maintain the diversity and distinctiveness of the local
landscapes and to enhance landscape characteristics where they have
been weakened.
7.26 Policy ENV9: Flooding presumes against development which would
be at unacceptable risk of flooding or would increase the risk of
flooding elsewhere. It states that Flood Risk Assessments will be
required for most forms of development in areas of medium to high risk
but may also be required at other locations depending on the
circumstances of the proposed development. Furthermore, it states
that Sustainable urban drainage systems will be required for most
forms of development, so that surface water run-off rates are not
greater than in the site’s pre-developed condition, and to avoid any
deterioration of water quality.
7.27 Policy ENV10: Water Environment requires that new development
pass surface water through a sustainable urban drainage system
(SUDS) to mitigate against local flooding and to enhance biodiversity
and the environmental.
7.28 Policy ENV11: Woodland, Trees and Hedges states that
development will not be permitted where it could lead directly or
indirectly to the loss of, or damage to, woodland, groups of trees
(including trees covered by a Tree Preservation Order, areas defined
as ancient or semi-natural woodland, veteran trees or areas forming
part of any designated landscape) and hedges which have a particular
amenity, nature conservation, biodiversity, recreation, landscape,
shelter, cultural, or historical value or are of other importance.
7.29 Policy ENV14: Regionally and Locally Important Nature
Conservation Sites states that development will not be permitted
where it could adversely affect the nature conservation interest of such
sites, unless it can be demonstrated that appropriate mitigation
measures are in place.
7.30 Policy ENV15: Species and Habitat Protection and Enhancement
presume against development that would affect a species protected by
European or UK law.
Page 80 of 118

Page 81

7.31 Policy ENV17: Air Quality states that the Council may require further
assessments to identify air quality impacts where considered requisite.
It will refuse planning permission, or seek effective mitigation, where
development proposals cause unacceptable air quality or dust impacts.
7.32 Policy ENV18: Noise requires that where new noise sensitive uses
are proposed in the locality of existing noisy uses, the Council will seek
to ensure that the function of established operations is not adversely
affected.
7.33 Policy IMP1: New Development ensures that appropriate provision is
made for a need which arises from new development. Of relevance in
this case are education provision, transport infrastructure; contributions
towards making good facility deficiencies; affordable housing;
landscaping; public transport connections, including bus stops and
shelters; parking in accordance with approved standards; cycling
access and facilities; pedestrian access; acceptable alternative access
routes, access for people with mobility issues; traffic and environmental
management issues; protection/management/compensation for natural
and conservation interests affected; archaeological provision and
‘percent for art’ provision.
7.34 Policy IMP2: Essential Infrastructure Required to Enable New
Development to Take Place states that new development will not take
place until provision has been made for essential infrastructure and
environmental and community facility related to the scale and impact of
the proposal. Planning conditions will be applied and; where
appropriate, developer contributions and other legal agreements will be
used to secure the appropriate developer funding and ensure the
proper phasing of development.
7.35 Policy IMP3: Water and Drainage require sustainable urban drainage
systems (SUDS) to be incorporated into new development.
8 PLANNING ISSUES
8.1 The grant of planning permission in principle, 20/00151/PPP,
established the principle for residential development, community
facilities, primary school and associated works at this site. The current
MSC application being assessed relates to the details required to
discharge conditions 4, 5, 6, 8, 9, 10 and 20 in relation to the key
infrastructure for the whole application site. These details include key
spine roads and paths, bus route, noise mitigation, SUDS, play areas
and open space and associated landscaping and biodiversity.
8.2 The planning permission in principle, 20/00151/PPP, approved a
Development Framework.  The approved Development Framework
responds to the outcomes of an Environmental Impact Assessment
and sets out an indicative framework for the development of the site,
Page 81 of 118

Page 82

outlining spatial parameters that influence the form of the development.
The overarching vision for the future development of the site seeks to
create development that has a strong identity and maximises
opportunities relating to the site’s existing features - to create a
responsive urban form with a ‘sense of place’ that is accessible. 
General Layout 
8.3 Details of the main spine roads and footpaths have been submitted and
broadly comply with the approved Development Framework. Four
primary access routes connect the site to the local road network. This
includes vehicular access points to Rosewell Road (A6094) to the
west, the Bonnyrigg Distributor Road (B6392) to the south and two
accesses to the existing Hopefield estate at Bannockrigg Road and
Castell Maynes Crescent. 
8.4 The site is bisected by the National Cycle Network (NCN 196) and
Core Path 6-35 which runs north south within the western part of the
site are to be retained. An existing bridleway and part of the Core-Path
6-35 running through the centre of the site are proposed to be
realigned along the southern site boundary before connecting to
Rosewell Road.  Pedestrian routes and cycle routes are also proposed
through the full site connecting to the NCN 196, Castell Maynes
Crescent, Bannockrigg Road, Rosewell Road and the Bonnyrigg
Distributor Road (B6392).  An additional informal path is proposed to
the western side of little wood which connects to the realigned
bridleway/core path to the south of the site to the norther side of the
site.   
8.5 The proposed access and movement hierarchy is acceptable as it
would allow for a safe, legible, ordered approach to accessibility that
reflects the role and function of adjacent areas and creates a harmony
between the creation of place and requirements to facilitate movement.
The road hierarchy prioritises movements within the primary spine road
with secondary and tertiary streets facilitating movement
complemented by extensive pedestrian and multi-uses/Core Path
enhancement for the benefit of future residents. This matter is
recommended to be approved and relates to most matters in condition
4 except for 4.x, 4.xiii, 4.xviii.   
Off-site Road Improvements 
8.6 Details of proposed off-site improvements to the local road network
identified in Chapter 4 of the Transport Assessment and the EIA
Schedule of Mitigation (Traffic & Transport Section) were submitted.
Chapter 4 of the Transport Assessment and the EIA Schedule of
Mitigation (Traffic & Transport Section) identified the following areas for
off-site improvements: 
• A7 / Lasswade Road / Melville Dykes Road (roundabout).
Page 82 of 118

Page 83

• A7 / Bonnyrigg Road / Retail access / Eskbank Road (roundabout)
• A7 / B6392 (roundabout).
• B704 Cockpen Road / B6392 (roundabout).
• Burnbrae Road / B6392 (roundabout).
• Burnbrae Terrace / B6392 (roundabout).
• A6094 Rosewell Road / B6392 (roundabout) High Street / Lothian
Street / Dundas Street / A6094 Rosewell Road (traffic signals)
8.7 While the submitted details align with the requirements of the EIA they
are not sufficiently detailed to allow the discharge of condition 4xiii as
advised by the Senior Manager Neighbourhood Services (Roads and
Flooding). This matter is not recommended for approved. 
Bus Route and Travel Plan
8.8 At PPP stage the transport assessment and EIA outlined that the
application site was well located to deliver sustainability objectives
encouraging non-car-based travel.  The off-site works required, and
detailed above, would be complemented by improvements to the
existing pedestrian and cycle networks and the formation of new
interconnecting multi-user access links in addition to extended bus
routes through the site. 
8.9 The area is afforded the following bus routes:
• Lothian Buses service 31 which is a split service that runs from
East Craigs to either Hopefield or Rosewell (via Polton Road
West). Monday to Friday, the route operates approximately a
15-minute service between East Craigs and Bonnyrigg Toll; the
buses then split and either run to Rosewell or Hopefield. The
split service operates at a 30-minute service. The service
operates Saturday and Sunday at slightly longer intervals
between buses.
• Lothian Buses service X31 is an express bus service, with
limited stops that runs from Rosewell (stops at Hopefield) to the
West End of Edinburgh. The service operates Monday to Friday,
providing three buses in the morning and three buses in the
evening at peak times. The morning service is approximately
every 12-24 minutes, and the evening service runs every 30-
minutes.
• Lothian Buses service 39 runs between Polton (Cameron
Crescent) and Dalkeith Campus and typically operates as a 60-
minute service Monday to Saturday.
8.10 During the assessment of the PPP application it was determined that a
bus route should be provided through the Hopefield Farm 2 site. This
would be to facilitate an extension of the Lothian Bus service which
already services the neighbouring Hopefield Farm 1 site. A route wide
enough to accommodate public transport was conditioned (condition
4.x) to be provided between Bannockrigg Road and Castell Maynes
Page 83 of 118

Page 84

Avenue.  Details of the proposed bus loop road have been submitted
and fully comply with the requirements of the condition whilst also
complying with the approved Development Framework. In addition, the
applicant has extended this public transport corridor in order that it can
also link to the new roundabout on Rosewell Road. 
8.11 Unfortunately, during the processing of this current application it has
come to light that the operator of the existing bus service that runs
within the surrounding area, Lothian Buses, advised that the proposed
route will not be utilised by them at this time. Lothian Buses noted that
in some instances buses would be required to use the full width of the
opposing carriageway to make left turns which fails to make the road
suitable for a bus service.  However, the Council’s Senior Manager
Neighbourhood Services (Roads) confirmed that the auto-tracking
details submitted along with the application do not indicate any issues
and that the buses currently serve many roads that are the same width
as those proposed in this development.  The details submitted comply
with the condition requirements, there are no material planning
considerations to warrant the refusal of the condition.  The matters
submitted therefore complies with policy IMP1 of the MLDP and Policy
18 of the National Planning Framework 4. This matter is recommended
to be approved and relates to condition 4.x. 
8.11 The application submission includes details of a travel plan which is to
be provided to all new residents so as to inform them of proposed
roads and path networks, existing and proposed active travel routes
including walking/wheeling and cycling, cycle routes, public transport
services, details of EV changing and promotion of car sharing, local
amenities/facilities.  All the required details have been submitted, and
the travel plan is acceptable and therefore complies with policy IMP1 of
the MLDP and Policy 18 of the National Planning Framework 4. This
matter is recommended to be approved and relates to condition 4.xviii. 
Material Finishes and Ancillary Structures 
8.12 Details of the location, design and material finishes of any hard ground
surfacing, proposed walls, fences and gates, including those
surrounding bin stores or any other ancillary structures have been
submitted and broadly comply with the approved Development
Framework. However, some details have not been submitted, such as
details of the design and material finishes of the sub stations and
surrounding fencing. Therefore, conditions 5.v and 6 cannot be
discharged/approved at this time. 
Sustainable Urban Drainage 
8.13 The application submission includes details of five SUDS basins and
one SUDS pond. Details of the proposed SUDS have been submitted
and fully comply with the requirements of the condition whilst also
complying with the approved Development Framework. The Council’s
Page 84 of 118

Page 85

Senior Manager Neighbourhood Services (Flooding) and SEPA offered
no objection to the details submitted in terms of flood risk and any
future adoption by Scottish Water will be subject to a separate
regulatory process – Scottish Water did not object to the principle of
the infrastructure at the PPP stage. The details submitted therefore
comply with policy IMP3 of the MLDP and Policy 20 of the NPF4. This
matter is recommended to be approved and relates to condition 10. 
Noise 
8.14 Details of the noise mitigation have been submitted and include areas
of bunding and the erection of acoustic fencing around parts of the
perimeter of the site. It is essential that these areas set aside for noise
mitigation are secured to protect the amenity of future residents of the
site. The noise mitigation measures comply with the approved
Development Framework. The Council’s Senior Manager Protective
Services confirmed that they are satisfied that the submitted review of
noise mitigation measures demonstrates compliance with Condition 20. 
It is necessary to note that the noise mitigation measures will impact on
the layout of residential units in forthcoming applications. This matter is
recommended to be approved and relates to condition 20. 
Landscaping 
8.15 Details of the landscaping associated with the infrastructure phase of
the development has been submitted for assessment. The landscaping
details include the planting for the acoustic bunding that wraps around
the south-west corner of the site alongside Rosewell Road and B6392
and continues along the southern perimeter of the application site,
B6392. The bunding is approximately 2 metres in height with a 1-
metre-high acoustic fence adjacent to Rosewell Road then the acoustic
bund increases to 3 metres in height for the rest of the perimeter with
no fencing. The bunding is required by condition 20 and the approved
Development Framework; any deviation from this would not comply
with the original planning permission in principle.  The acoustic bunding
is to be planted up with a mixed native woodland. Generally, the
arrangement of the proposed structure landscaping around the
perimeter of the site complies with the Development Framework and
are acceptable. However, there are some of the planting details,
planting specification details and maintenance schedule that are not
wholly acceptable in terms of the planting density for the woodland
planting, landscape specification for soil requirements, landscape
maintenance schedule and the planting specification details. Overall,
while the submitted details align with the Development Frameworks
and satisfy the majority of condition 5, some details are not sufficiently
detailed to allow the discharge of conditions 5.iii, 5.vi and 5.vii at this
time. The remaining landscape details submitted comply with policy
DEV7 of the MLDP and Policy 6 of the NPF4, these matters are
recommended to be approved and relate to the remaining matters
Page 85 of 118

Page 86

within condition 5 except for 5.xvi which is addressed in the biodiversity
section below. 
Play Areas/Open Space 
8.16 Minimal details have been submitted in relation to the play areas and
the play equipment.  More detailed information is required in terms of
the proposed play equipment and areas of open space, including
benches, surfacing and accessibility of the play areas. The details
submitted therefore do not comply with policy DEV7 of the MLDP and
Policy 6 of the NPF4. The details are not sufficiently detailed to allow
the discharge of condition 5.x currently. This matter is not
recommended for approval. 
Biodiversity 
8.17 All the required details have been submitted and details of the
ecological enhancements identified within the EIA Report or any repeat
surveys shown on the corresponding detailed landscape plans are
acceptable. The ecological enhancements include the installation of
bee posts, installation of an invertebrate/amphibian gabion, installation
of invertebrate/amphibian refuge/hibernacula, installation of hedgehog
houses, installation of garden bird nest boxes, installation of owl nest
boxes and the installation of bat boxes along with landscaping.
NatureScots Advice also advise that wildlife kerbs and toad ladders
complement each other and should be installed together. All drains
pose a risk to wildlife, but priority should be given to those within 500
meters of a SUDS feature, water feature or suitable amphibian foraging
or hibernation habitat (especially woodland areas). Due to the nature of
the site and inclusion of SUDS basins and pond, wildlife kerbs and toad
ladders should be included as an ecological enhancement. This minor
addition can be secured via condition. Therefore, this condition has
been satisfactorily addressed. The details submitted therefore complies
with policy DEV7 of the MLDP and Policy 6 of the NPF4. This matter is
recommended to be approved and relates to condition 5.xvi subject to
condition. 
8.18 Details were submitted in an updated Landscape and Habitat
Management Plan in response to the ecological recommendations,
findings and mitigation measure within the EIA Report (Technical
Appendix 6 - Ecology) and include the following required details: 
i. Pre-construction, construction phase and operational phase
measures to translate mitigation measures into the design.
ii. Specific retention, protection and restoration proposals for of
Pittendreich Burn.
iii.  Proposed measures to minimise human interference to the 
southern part of Little Wood.
Page 86 of 118

Page 87

iv. The quantum, locations and areas for habitat features and
details where these features are constructed or proprietary
features.
v. Species Protection Plans for protected species identified in the
surveys of protected species or repeat surveys for protected
species.
vi. Measures to mitigate non-native species.
vii. Ecological mitigation measures identified within the EIA
Schedule of Mitigation (Ecology Section) for corresponding
species.
8.19 All the required details have been submitted and broadly comply with
the EIA Report (Technical Appendix 6 - Ecology), expect for a minor
concern regarding the fencing for the construction buffer. However, a
condition can be attached to address this minor concern. Therefore,
this condition has been satisfactorily addressed. The details submitted
therefore comply with policy DEV7 of the MLDP and Policy 6 of the
NPF4. This matter is recommended to be approved subject to a
condition and relates to condition 8. 
9 RECOMMENDATION
9.1 The Committee is recommended to:
a. approve and discharge conditions 4.i, 4.ii, 4.iii, 4.iv, 4.v, 4.vi,4.vii,
4.viii, 4.ix, 4.x, 4.xi, 4.xii, 4.xiv, 4.xv, 4.xvi, 4.xvii, 4.xviii, 4.xix, 5.i,
5.ii, 5.iv, 5.viii, 5.ix, 5.xi, 5.xii, 5.xiii 5.xiv, 5.xv, 5.xvi, 5.xvii, 5.xviii,
5.xix, 8, 9, 10 and 20 of planning permission 20/00151/PPP; and
b. not discharge conditions 4.xiii, 5.iii, 5.v, 5.vi, 5.vii, 5.x and 6 of
planning permission 20/00151/PPP.
Peter Arnsdorf
Head of Placemaking
Date: 17 April 2026
Application No:    25/00155/MSC
Applicant:  Taylor Wimpey UK Limited
Agent:         Lesley McGrath, LarnerMcGrath Ltd
Validation Date:  24 March 2025
Contact Person:  Whitney Lindsay 
Email:   Whitney.Lindsay@midlothian.gov.uk 
Background Papers: 17/00706/SCO, 20/00151/PPP, 25/00108/MSC,
25/00155/MSC, 25/00199/MSC, 25/00249/MSC,
25/00383/MSC, 25/00345/DPP, 26/00006/ADV. 
Attached Plans: Site Layout Drawing 
Appendix A: Condition Details, Submission and Proposed
Decision
Page 87 of 118

Page 88

56
2
1
Def
13
Drain
BURNBRAE ROAD NORTH
5
3
1
118a
12
63
2
Posts
164
2
33
12
Def
56 to 72
Tank
L Twr
2
7
LITTLE WOOD GROVE
1
233
13
11
A 6094
8
34
8
1
Dalhousie Chesters
BANNOCKRIGG TERRACE
2
Balancing Pond
44
20
Nursing Home
21
139 to 151
B 6392
46
6
El Sub Sta
12
27
36
18
BANNOCKRIGG LOAN
43
Posts
9
17
MAYNES
43
22
CRESCENT
537Lighting Tower
Drain
ESS
4
El Sub Sta
2
B 6392
Playing Field
L Twr
17
33
32
Issues
18
191
3
65
Balancing
7
10
8
209
1
AULD COAL BANK
16
CASTELL
46
23
17
8
38
4
11
Little
BANNOCKRIGG GARDENS
179
Wood
14
5
52
Drain
ROSEWELL ROAD
Burnbrae Primary School
1
3
9
155
142
58
3
Dalhousie Chesters Court
MALLENS BURN DRIVE
105 to 115
243
7
181
19
Def
116
Shelter
11
122.8m
Lighting Tower
1
Shelter
7
Dalhousie Chesters
132
120a
197
FB
10
11
1
Ward Bdy
B 6392
49
45
Posts
122
174
8
El Sub Sta
Issues
8
7
3
L Twr
7
2
32
12
34
33
6
COCKPEN DRIVE
Drain
60
15
2 to 14
1
L Twr
Car Park
22
Pond
12
8
Def
2
37
29
17
1
Depot
Drain
Def
WHINNYROW
CLOSE
73
13
57
Pond
12
118
25
13
Shelter
CASTELL MAYNES AVENUE
Track
Play Area
1
Poltonhall
3
43
231
117 to 137
50
4
167
116a
COCKPEN AVENUE
9
7
4
to 54
27
100.0m
2
1
7
59
29
Path
14
15
127.4m
Shelter
51
16 to 26
Play Area
103
2
Shelter
16
1
54
219
24
COCKPEN CRESCENT
1
111.9m
12
13
39
115.2m
OTTERBURN GARDENS
1
1 to 23
BURNBRAE TERRACE
2
1
Track
Springfield Bank
BANNOCKRIGG ROAD
1 to 12
2
1
120
199
9
2
6
Mast
1
2
21
New
127.1m
DALHOUSIE
CHESTERS
STOP
BUS
STOP
BUS
STOP BUS
STOPBUS
STOPBUS
STOP
BUS
STOP
BUS
STOP
BUS
RMUTOC
TRANSFORMER
R
M
U
T
O
C
T
R
A
N
S
F
O
R
M
E
R
R
M
U
T
O
C
T
R
A
N
S
F
O
R
M
E
R
3m Acoustic Bund
3m Acoustic Bund
3m Acoustic Bund
3m Acoustic Bund
3m Acoustic Bund
2m
Bund and 1m
Acoustic Fence
2m
Bund and 1m
Acoustic Fence
2m Bund and 1m Acoustic Fence
BANNOCK WOOD WEST
ZONE 2A - PRIVATE
DEVELOPMENT
BANNOCK WOOD WEST
ZONE 1 - AFFORDABLE
DEVELOPMENT
BANNOCK WOOD WEST
ZONE 1 - PRIVATE
DEVELOPMENT
BANNOCK WOOD WEST
ZONE 2 - PRIVATE
DEVELOPMENT
BANNOCK WOOD WEST
SCHOOL ZONE
BANNOCK WOOD EAST
PRIVATE & AFFORDABLE
DEVELOPMENT ZONE 3
BANNOCK WOOD EAST
PRIVATE & AFFORDABLE
DEVELOPMENT ZONE 4
BANNOCK WOOD EAST
PRIVATE & AFFORDABLE
DEVELOPMENT ZONE 5
SUDS BASIN
SUDS BASIN
SUDS BASIN
SUDS BASIN
ROSWELL ROAD ROUNDABOUT
23/00345/DPP
PLANNING CONSENT REF :
BANNOCK WOOD WEST
ZONE 2 - AFFORDABLE
DEVELOPMENT
LITTLE
WOOD
LITTLE
WOOD
SUDS POND
SUDS BASIN
NOTES
Drg No:
/
Checked By:
Scale:
Drawn By:
Date:
Project:
/
Title:
Taylor Wimpey East Scotland
1 Masterton Park
South Castle Drive
Dunfermline KY11 8NX
Tel 01383 845 700 Fax 01383 845 725
www.taylorwimpey.com
Bannock Wood Masterplan
Bonnyrigg, Midlothian
AMSC Application
AMSC Infrastructure Works
21925 INFRA 01 C
1:1250 @ A0 Sept'23
PLM N/A
LEGEND:
PHASE 1 AMSC APPLICATION :
INFRASTRUCTURE & STRUCTURAL LANDSCAPING
MD
TD
L&PD
CD
FD
SD
PD
PLANNING APPLICATION
AUTHORITY GIVEN TO
LODGE FOR PLANNING
ACKNOWLEDGEMENT OF
VERSION GAINING APPROVAL
DATE
CD
DD
UK DD
AMSC PLANNING APPLICATION BOUNDARY UPDATED AS AGREED.A AUG'24 CH
TAYLOR WIMPEY TITLE BOUNDARY
MIDLOTHIAN COUNCIL LAND OWNERSHIP
DALHOUSIE CHESTERS LAND OWNERSHIP
ROSEWELL ROAD ROUNDABOUT APPROVAL BOUNDARY
PLANNING CONSENT REF: 23/00345/DPP
PROPOSED ADOPTABLE ROADS
PROPOSED ADOPTABLE FOOTPATHS
PROPOSED 'CLOSE MOWN' INFORMAL PATH
PROPOSED STRUCTURAL LANDSCAPING / ACOUSTIC BUNDS
PROPOSED LANDSCAPING / PUBLIC OPEN SPACE
PROPOSED ADOPTABLE SUDS BASIN / POND
OPEN SPACE TO THE SOUTH EAST BOUNDARY (ZONE 5) REVISED.B SEP'24 JID
INFRASTRUCTURE DESIGN ALTERED TO REFLECT COMMENTS RECIEVEDC OCT'25 CH
FROM MIDLOTHIAN COUNCIL PLANNING, LANDSCAPE & ROADS OFFICERS.
EXISTING WOODLAND / STRUCTURAL OPEN SPACE
Page 88 of 118

Page 89

Appendix A: Condition Details, Submission and Decision
Matter 4.i: 
Development shall not begin on an individual phase of development (identified
in compliance with Condition 3) until an application for approval of matters
specified in conditions for that phase including the site access, roads,
footpaths, cycle ways and transportation movements has been submitted to
and approved in writing by the planning authority for each phase. Details of
the scheme, including a programme for completion, shall include: i. existing
and finished ground levels for all roads, footways and multi-user paths/cycle
ways in relation to a fixed datum. Development shall thereafter be carried out
in accordance with the approved details or such alternatives as may be
agreed in writing with the planning authority.
Submission: 
50710-PL-41-051-P05 Rosewell Roundabout Planning General Arrangement
50710-PL-27-051-P04 Rosewell Roundabout Planning Proposed Existing
Levels
RCC05 Path Extension and Equestrian Crossing Spot levels and Contour
Plan 65215-IFL-15-00-DR-C-520 P01
RCC04 Southern Roundabout Contour Plan 65215-IFL-00-00-DR-C-430 P02
RCC02 Contour Plan Sheet 1 65215-IFL-15-00-DR-C-305 P05
RCC02 Contour Plan Sheet 2 65215-IFL-15-00-DR-C-306 P05
RCC02 Contour Plan Sheet 3 65215-IFL-15-00-DR-C-307 P05
RCC02 Contour Plan Sheet 4 65215-IFL-15-00-DR-C-308 P05
RCC03 Contour Plan Sheet 1 65215-IFL-15-00-DR-C-330 P04
RCC03 Contour Plan Sheet 2 65215-IFL-15-00-DR-C-331 P04
RCC03 Contour Plan Sheet 3 65215-IFL-15-00-DR-C-332 P04
RCC03 Contour Plan Sheet 4 65215-IFL-15-00-DR-C-333 P04
RCC03 Contour Plan Sheet 5 65215-IFL-15-00-DR-C-334 P04
Decision: Approve
Matter 4.ii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: ii.
the proposed vehicular, cycle and pedestrian accesses into the site.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: 
50710-PL-41-051-P05 Rosewell Roundabout Planning General Arrangement
RCC04 Southern Roundabout General Arrangement 65215-IFL-00-00-DR-C-
412 P02
RCC05 Path Extension and Equestian Crossing General Arrangement 65215-
IFL-00-00-DR-C-510 P02
RCC02 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-101 P05
RCC02 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-102 P05
RCC02 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-103 P05
Page 89 of 118

Page 90

RCC02 General Arrangement Sheet 4 65215-IFL-00-00-DR-C-104 P05
RCC02 Adoption Plan & Take-Off Sheet 1 65215-IFL-00-00-DR-C-301 P04
RCC02 Adoption Plan & Take-Off Sheet 2 65215-IFL-00-00-DR-C-302 P04
RCC02 Adoption Plan & Take-Off Sheet 3 65215-IFL-00-00-DR-C-303 P04
RCC02 Adoption Plan & Take-Off Sheet 4 65215-IFL-00-00-DR-C-304 P04
RCC02 Kerbing Layout Sheet 1 65215-IFL-30-00-DR-C-201 P04
RCC02 Kerbing Layout Sheet 2 65215-IFL-30-00-DR-C-202 P04
RCC02 Kerbing Layout Sheet 3 65215-IFL-30-00-DR-C-203 P04
RCC02 Kerbing Layout Sheet 4 65215-IFL-30-00-DR-C-204 P04
RCC03 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-312 P05
RCC03 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-313 P05
RCC03 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-314 P05
RCC03 General Arrangement Sheet 4  65215-IFL-00-00-DR-C-315 P05
RCC03 General Arrangement Sheet 5 65215-IFL-00-00-DR-C-316 P05
RCC03 Kerbing Layout Sheet 162515-IFL-00-00-DR-C-340 P03
RCC03 Kerbing Layout Sheet 2 62515-IFL-00-00-DR-C-341 P03
RCC03 Kerbing Layout Sheet 3 62515-IFL-00-00-DR-C-342 P03
RCC03 Kerbing Layout Sheet 4 62515-IFL-00-00-DR-C-343 P03
RCC03 Kerbing Layout Sheet 5 62515-IFL-00-00-DR-C-344 P03
Decision:  Approve
Matter 4.iii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: iii.
the proposed roads, footways and turning facilities designed to an adoptable
standard) and multi-user paths/ cycle ways including suitable walking and
cycling routes. Development shall thereafter be carried out in accordance with
the approved details or such alternatives as may be agreed in writing with the
planning authority.
Submission: 
50710-PL-41-051-P05 Rosewell Roundabout Planning General Arrangement
RCC04 Southern Roundabout General Arrangement 65215-IFL-00-00-DR-C-
412 P02
RCC05 Path Extension and Equestian Crossing General Arrangement 65215-
IFL-00-00-DR-C-510 P02
RCC02 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-101 P05
RCC02 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-102 P05
RCC02 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-103 P05
RCC02 General Arrangement Sheet 4 65215-IFL-00-00-DR-C-104 P05
RCC02 Adoption Plan & Take-Off Sheet 1 65215-IFL-00-00-DR-C-301 P04
RCC02 Adoption Plan & Take-Off Sheet 2 65215-IFL-00-00-DR-C-302 P04
RCC02 Adoption Plan & Take-Off Sheet 3 65215-IFL-00-00-DR-C-303 P04
RCC02 Adoption Plan & Take-Off Sheet 4 65215-IFL-00-00-DR-C-304 P04
RCC02 Kerbing Layout Sheet 1 65215-IFL-30-00-DR-C-201 P04
RCC02 Kerbing Layout Sheet 2 65215-IFL-30-00-DR-C-202 P04
RCC02 Kerbing Layout Sheet 3 65215-IFL-30-00-DR-C-203 P04
RCC02 Kerbing Layout Sheet 4 65215-IFL-30-00-DR-C-204 P04
Page 90 of 118

Page 91

RCC03 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-312 P05
RCC03 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-313 P05
RCC03 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-314 P05
RCC03 General Arrangement Sheet 4  65215-IFL-00-00-DR-C-315 P05
RCC03 General Arrangement Sheet 5 65215-IFL-00-00-DR-C-316 P05
RCC03 Kerbing Layout Sheet 162515-IFL-00-00-DR-C-340 P03
RCC03 Kerbing Layout Sheet 2 62515-IFL-00-00-DR-C-341 P03
RCC03 Kerbing Layout Sheet 3 62515-IFL-00-00-DR-C-342 P03
RCC03 Kerbing Layout Sheet 4 62515-IFL-00-00-DR-C-343 P03
RCC03 Kerbing Layout Sheet 5 62515-IFL-00-00-DR-C-344 P03
Decision: Approve
Matter 4.iv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: iv.
details, including cross sections, of any roads/footpaths/cyclepaths crossing
Little Wood to show the carriageway, footpath/multiuser path, services,
verges, tree planting, tree protection, landscape planting
embankments/gradients and working areas. Development shall thereafter be
carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission: 
110238_OP_SE07_DR_S_200 Soft Landscaping Infrastructure Zone 7 Rev
02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
RCC03 Pittendriech Burn Culvert Road Crossing GA 65215-IFL-20-00-DR-C-
100 P04
RCC03 Pittendriech Burn Culvert Bridleway Crossing GA 65215-IFL-20-00-
DR-C-101 P03
RCC02 Castell Maynes Road Crossing 65215-IFL-80-00-DR-C-504 P03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Hard landscape infrastructure zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape infrastructure zone 7 110238_OP_SE07_DR_H_200 Rev 04
Decision: Approve
Matter 4.v: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: v.
proposed visibility splays, traffic calming measures, lighting and signage.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: 
Page 91 of 118

Page 92

RCC04 Southern Roundabout Road Markings & Traffic Signs 65215-IFL-40-
00-DR-C-450 P02
Proposed Lighting Layout 213-LDF-DR-SL-02-P03
Proposed Lighting Layout 213-LDF-DR-SL-03-P03
Proposed Lighting Layout 213-LDF-DR-SL-04-P03
Proposed Lighting Layout 213-LDF-DR-SL-05-P03
Proposed Lighting Layout 213-LDF-DR-SL-06-P03
Proposed Lighting Layout 213-LDF-DR-SL-07-P02
Proposed Lighting Layout 213-LDF-DR-SL-08-P02
Proposed Lighting Layout 213-LDF-DR-SL-09-P02
Proposed Lighting Layout 213-LDF-DR-SL-10-P02
Proposed Lighting Layout 213-LDF-DR-SL-11-P02
RCC02 Road Markings and Traffic Signs Sheet 1 65215-IFL-40-00-DR-C-101
P05
RCC02 Road Markings and Traffic Signs Sheet 2 65215-IFL-40-00-DR-C-102
P05
RCC02 Road Markings and Traffic Signs Sheet 3 65215-IFL-40-00-DR-C-103
P05
RCC02 Road Markings and Traffic Signs Sheet 4 65215-IFL-40-00-DR-C-104
P05
RCC02 Road Markings and Traffic Signs Sheet 5 65215-IFL-40-00-DR-C-105
P05
RCC03 Road Markings and Traffic Signs Sheet 1 65215-IFL-40-00-DR-C-350
P04
RCC03 Road Markings and Traffic Signs Sheet 2 65215-IFL-40-00-DR-C-351
P04
RCC03 Road Markings and Traffic Signs Sheet 3 65215-IFL-40-00-DR-C-352
P04
RCC03 Road Markings and Traffic Signs Sheet 4 65215-IFL-40-00-DR-C-353
P04
RCC03 Road Markings and Traffic Signs Sheet 5 65215-IFL-40-00-DR-C-354
P04
RCC03 Road Markings and Traffic Signs Sheet 6 65215-IFL-40-00-DR-C-355
P02
Outdoor Lighting Report 15 December 2025
Decision:  Approve
Matter 4.vi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: vi.
proposed residents and visitor car parking arrangements to meet the
Council’s Parking Standards. Development shall thereafter be carried out in
accordance with the approved details or such alternatives as may be agreed
in writing with the planning authority.
Submission: No parking proposed within this phase. 
Decision: Approve
Page 92 of 118

Page 93

Matter 4.vii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
vii. proposed cycle parking/storage facilities. Development shall thereafter be
carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission: No cycle parking proposed within this phase
Decision: Approve
Matter 4.viii : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
viii. proposed connections to Core Paths. Development shall thereafter be
carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission:
RCC05 Path Extension and Equestrian Crossing General Arrangement
65215-IFL-00-00-DR-C-510 P02
RCC05 Path Extension and Equestrian Crossing Longitudinal Sections
65215-IFL-00-00-DR-C-512 P01
RCC05 Path Extension and Equestrian Crossing Spot Levels and Contour
Plan 65215-IFL-00-00-DR-C-520 P01
RCC02 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-101 P05
RCC02 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-102 P05
RCC03 General Arrangement Sheet 4 65215-IFL-00-00-DR-C-315 P05
Decision:  Approve
Matter 4.ix: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: ix.
proposed alignment, surface materials, widths and verge details for Core Path
realignments and any upgrades. Development shall thereafter be carried out
in accordance with the approved details or such alternatives as may be
agreed in writing with the planning authority.
Submission: 
Soft Landscape Infrastructure Zone 04 110238_OP_SE04_DR_S_200 02
Soft Landscape Infrastructure Zone 05 110238_OP_SE05_DR_S_200 02
Soft Landscape Infrastructure Zone 08 110238_OP_SE08_DR_S_200 02
Soft Landscape Infrastructure Zone 11 110238_OP_SE11_DR_S_200 02
Soft Landscape Infrastructure Zone 13 110238_OP_SE13_DR_S_200 02
Hard Landscape Infrastructure Zone 05 110238_OP_SE05_DR_H_200 02
Page 93 of 118

Page 94

Hard Landscape Infrastructure Zone 08 110238_OP_SE08_DR_H_200 02
Hard Landscape Infrastructure Zone 11 110238_OP_SE11_DR_H_200 02
Hard Landscape Infrastructure Zone 13 110238_OP_SE13_DR_H_200 02
RCC05 Path Extension and Equestrian Crossing General Arrangement
65215-IFL-00-00-DR-C-510 P02
RCC05 Path Extension and Equestrian Crossing Longitudinal Sections
65215-IFL-00-00-DR-C-512 P01
RCC05 Path Extension and Equestrian Crossing Spot Levels and Contour
Plan 65215-IFL-00-00-DR-C-520 P01
RCC02 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-101 P05
RCC02 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-102 P05
RCC03 General Arrangement Sheet 4 65215-IFL-00-00-DR-C-315 P05
RCC03 General Arrangement Sheet 5 65215-IFL-00-00-DR-C-316 P04
Hard Landscape Infrastructure Zone 04 110238_OP_SE04_DR_H_200 02
Decision:  Approve
Matter 4.x: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: x.
The new bus loop road linking the stub end at Bannockrigg Road with Castell
Maynes Avenue formed to a minimum width of at least 6.5m wide with details
and locations of bus stops and shelters along the route. Development shall
thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission: 
50710-PL-41-051-P05 Rosewell Roundabout Planning General Arrangement
RCC02 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-101 P05
RCC02 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-102 P05
RCC02 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-103 P05
RCC02 General Arrangement Sheet 4 65215-IFL-00-00-DR-C-104 P05
RCC03 General Arrangement Sheet 1 65215-IFL-00-00-DR-C-312 P05
RCC03 General Arrangement Sheet 2 65215-IFL-00-00-DR-C-313 P05
RCC03 General Arrangement Sheet 3 65215-IFL-00-00-DR-C-314 P05
RCC03 General Arrangement Sheet 4  65215-IFL-00-00-DR-C-315 P05
RCC03 General Arrangement Sheet 5 65215-IFL-00-00-DR-C-316 P05
Decision: Approve 
Matter 4.xi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include: xi.
Details of the proposed roundabout on the B6392. Development shall
thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission: 
Page 94 of 118

Page 95

110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
RCC04 Southern Roundabout General Arrangement 65215-IFL-00-00DR-C-
412 P02
RCC04 Southern Roundabout Contour Plan 65215-IFL-00-00DR-C-430 P02
RCC04 Southern Roundabout Road Markings & Traffic Signs 65215-IFL-00-
00DR-C-450 P02
RCC04 Southern Roundabout Drainage Layout 65215-IFL-00-00DR-C-470
P03
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Decision:  Approve 
Matter 4.xii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xii. Details of the proposed roundabout on Rosewell Road. Development shall
thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission:
50710-PL-41-051-P05 Rosewell Roundabout Planning General Arrangement
50710-PL-27-051-P04 Rosewell Roundabout Planning Proposed  Existing
Levels
50710-PL-60-001 - P04 - Rosewell Roundabout Landscape GA
Decision:  Approve
Matter 4.xiii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xiii. Details of proposed off-site improvements to the local road network
identified in Chapter 4 of the Transport Assessment and the EIA Schedule of
Mitigation (Traffic & Transport Section). Development shall thereafter be
carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission:
Transport Assessment Part 1
Transport Assessment Part 2
Transport Assessment Part 3
Transport Assessment Part 4
Page 95 of 118

Page 96

Sketch plans and relevant text split out from TA and issued to MLC 240325
Decision:  Not approved. 
Matter 4.xiv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xiv. The section of core path (National Cycle Route 196) within the site
increased in width to a minimum of 4.0m width where practical. Development
shall thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission: No increase proposed due to it not practical to widen the width
of the core path due the presence of woodland, trees and hedgerow.
Decision:  Approve
Matter 4.xv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xv. Details of a traffic signal controlled crossing to upgrade the existing
informal pedestrian/equestrian crossing of the B6392. Development shall
thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission:
RCC05 Path Extension and Equestrian Crossing General Arrangement
65215-IFL-00-00-DR-C-510 P02
RCC05 Path Extension and Equestrian Crossing Longitudinal Sections
65215-IFL-00-00-DR-C-512 P01
RCC05 Path Extension and Equestrian Crossing Spot Levels and Contour
Plan 65215-IFL-00-00-DR-C-520 P01
Decision: Approve
Matter 4.xvi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xvi. Resident and visitor parking to meet current council standards.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: No car parking is proposed within infrastructure
Decision:  Approve
Page 96 of 118

Page 97

Matter 4.xvii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xvii. Details of the provision and use of electric vehicle charging stations
throughout the development. Development shall thereafter be carried out in
accordance with the approved details or such alternatives as may be agreed
in writing with the planning authority.
Submission: No car parking is proposed within infrastructure
Decision: Approve
Matter 4.xviii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xviii. Details of a Travel Plan document (travel pack) for residents.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: Travel Plan submitted 22/12/25
Decision:  Approve.
Matter 4.xix : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for that phase including the site
access, roads, footpaths, cycle ways and transportation movements has been
submitted to and approved in writing by the planning authority for each phase.
Details of the scheme, including a programme for completion, shall include:
xix. a programme for completion for the construction of road improvements,
accesses, roads, footpaths, cycle paths and associated works. Development
shall thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission: Set out within approved phasing plan, 25/00383/MSC.
Decision: Approve.
Matter 5.i: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: i.
existing and finished ground levels and floor levels for all buildings and roads
in relation to a fixed datum. All hard and soft landscaping shall be carried out
in accordance with the scheme approved in writing by the planning authority
as the programme for completion and subsequent maintenance
(vii).Thereafter any trees or shrubs removed, dying, becoming seriously
diseased or damaged within five years of planting shall be replaced in the
Page 97 of 118

Page 98

following planting season by trees/shrubs of a similar species to those
originally required.
Submission: 
50710-PL-27-051-P04 Rosewell Roundabout Planning Proposed  Existing
Levels
RCC05 Path Extension and Equestrian Crossing Spot levels and Contour
Plan 65215-IFL-15-00-DR-C-520 P01
RCC04 Southern Roundabout Contour Plan 65215-IFL-00-00-DR-C-430 P02
RCC02 Contour Plan Sheet 1 65215-IFL-15-00-DR-C-305 P05
RCC02 Contour Plan Sheet 2 65215-IFL-15-00-DR-C-306 P05
RCC02 Contour Plan Sheet 3 65215-IFL-15-00-DR-C-307 P05
RCC02 Contour Plan Sheet 4 65215-IFL-15-00-DR-C-308 P05
RCC03 Contour Plan Sheet 1 65215-IFL-15-00-DR-C-330 P04
RCC03 Contour Plan Sheet 2 65215-IFL-15-00-DR-C-331 P04
RCC03 Contour Plan Sheet 3 65215-IFL-15-00-DR-C-332 P04
RCC03 Contour Plan Sheet 4 65215-IFL-15-00-DR-C-333 P04
RCC03 Contour Plan Sheet 5 65215-IFL-15-00-DR-C-334 P04
Decision:  Approve
Matter 5.ii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: ii.
existing trees, landscaping features and vegetation to be retained; removed,
protected during development and in the case of damage, restored. All hard
and soft landscaping shall be carried out in accordance with the scheme
approved in writing by the planning authority as the programme for completion
and subsequent maintenance (vii). Thereafter any trees or shrubs removed,
dying, becoming seriously diseased or damaged within five years of planting
shall be replaced in the following planting season by trees/shrubs of a similar
species to those originally required.
Submission: 
ARBORICULTURAL REPORT 
50710-PL-60-001 - P04 - Rosewell Roundabout Landscape GA
Copy of Woodland Management Plan and Associated Appendices.
Appendices 2 and 3 of Tree Survey and Arboriculture Report.
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
Page 98 of 118

Page 99

110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Tree Removals & retention Plan Phasing 12.06.2025;0117(290)-01 
Tree Removals & retention Plan Base 12.06.2025
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Approve
Matter 5.iii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: iii.
proposed new planting in communal areas and open space, including trees,
shrubs, hedging and grassed areas. All hard and soft landscaping shall be
carried out in accordance with the scheme approved in writing by the planning
authority as the programme for completion and subsequent maintenance (vii).
Thereafter any trees or shrubs removed, dying, becoming seriously diseased
or damaged within five years of planting shall be replaced in the following
planting season by trees/shrubs of a similar species to those originally
required.
Submission: 
50710-PL-60-001 - P04 - Rosewell Roundabout Landscape GA
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Page 99 of 118

Page 100

Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Decision:  Not Approved.
Matter 5.iv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: iv.
substantial new planting, structure planting and screening planting required in
accordance with the EIA Schedule of Mitigation. All hard and soft landscaping
shall be carried out in accordance with the scheme approved in writing by the
planning authority as the programme for completion and subsequent
maintenance (vii). Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of planting shall be replaced
in the following planting season by trees/shrubs of a similar species to those
originally required.
Submission: 
50710-PL-60-001 - P04 - Rosewell Roundabout Landscape GA
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Decision: Approve
Matter 5.v: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: v.
location and design of any proposed walls, fences and gates, including those
surrounding bin stores or any other ancillary structures. All hard and soft
landscaping shall be carried out in accordance with the scheme approved in
writing by the planning authority as the programme for completion and
subsequent maintenance (vii). Thereafter any trees or shrubs removed, dying,
becoming seriously diseased or damaged within five years of planting shall be
Page 100 of 118

Page 101

replaced in the following planting season by trees/shrubs of a similar species
to those originally required.
Submission: 
50710-PL-60-001 - P04 - Rosewell Roundabout Landscape GA
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Not Approved. 
Matter 5.vi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: vi.
schedule of plants to comprise species, plant sizes and proposed
numbers/density. All hard and soft landscaping shall be carried out in
accordance with the scheme approved in writing by the planning authority as
the programme for completion and subsequent maintenance (vii). Thereafter
any trees or shrubs removed, dying, becoming seriously diseased or
damaged within five years of planting shall be replaced in the following
planting season by trees/shrubs of a similar species to those originally
required.
Page 101 of 118

Page 102

Submission: 
Planting Details 01 110238_OP_DT_650
Planting Details 02 110238_OP_DT_651
Bannock Wood Softworks Schedule 110238_OP_SP_INFRA_700
Decision:  Not approved. 
Matter 5.vii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: vii.
programme for completion and subsequent maintenance of all soft and hard
landscaping. The landscaping in the open spaces shall be completed prior to
the houses on adjoining plots are occupied. All hard and soft landscaping
shall be carried out in accordance with the scheme approved in writing by the
planning authority as the programme for completion and subsequent
maintenance (vii). Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of planting shall be replaced
in the following planting season by trees/shrubs of a similar species to those
originally required.
Submission: 
Landscape and Habitat Management Plan
Soft Landscape Specification 110238_OP_SP_701 P00
Decision:  Not approved
Matter 5.viii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: viii.
proposed car park configuration and surfacing. All hard and soft landscaping
shall be carried out in accordance with the scheme approved in writing by the
planning authority as the programme for completion and subsequent
maintenance (vii). Thereafter any trees or shrubs removed, dying, becoming
seriously diseased or damaged within five years of planting shall be replaced
in the following planting season by trees/shrubs of a similar species to those
originally required.
Submission: No car parking is proposed within infrastructure
Decision:  Approve
Matter 5.ix: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: ix.
proposed footpaths and cycle paths (designed to be unsuitable for motor bike
use). All hard and soft landscaping shall be carried out in accordance with the
scheme approved in writing by the planning authority as the programme for
completion and subsequent maintenance (vii). Thereafter any trees or shrubs
removed, dying, becoming seriously diseased or damaged within five years of
Page 102 of 118

Page 103

planting shall be replaced in the following planting season by trees/shrubs of a
similar species to those originally required.
Submission: 
110238_OP_SE01_DR_G_200 Hard and Soft Landscape Infrastructure
Overall Plan Zone 1 Rev 02
110238_OP_SE02_DR_G_200 Hard and Soft Landscape Infrastructure
Overall Plan Zone 2 Rev 02
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Approve 
Matter 5.x: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: x.
proposed areas of open space, linear parks/green corridors, play areas
(including equipped play areas, informal kick about areas, informal open
space and natural play areas). Additional areas of open space shall also be
provided within the south-eastern corner of the site and pockets of open
space areas adjacent to core paths, cyclepaths and multi-user paths. All hard
Page 103 of 118

Page 104

and soft landscaping shall be carried out in accordance with the scheme
approved in writing by the planning authority as the programme for completion
and subsequent maintenance (vii). Thereafter any trees or shrubs removed,
dying, becoming seriously diseased or damaged within five years of planting
shall be replaced in the following planting season by trees/shrubs of a similar
species to those originally required.
Submission: 
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Not approved.   
Matter 5.xi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xi.
proposed cycle parking facilities. All hard and soft landscaping shall be carried
out in accordance with the scheme approved in writing by the planning
authority as the programme for completion and subsequent maintenance (vii).
Thereafter any trees or shrubs removed, dying, becoming seriously diseased
or damaged within five years of planting shall be replaced in the following
Page 104 of 118

Page 105

planting season by trees/shrubs of a similar species to those originally
required.
Submission: No cycle parking is proposed within this phase.
Decision:  Approve
Matter 5.xii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xii.
proposed area of improved quality (minimum of 20% of the proposed
dwellings). All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as the
programme for completion and subsequent maintenance (vii). Thereafter any
trees or shrubs removed, dying, becoming seriously diseased or damaged
within five years of planting shall be replaced in the following planting season
by trees/shrubs of a similar species to those originally required.
Submission: No housing proposed within this phase.
Decision:  Approve
Matter 5.xiii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xiii.
construction details for landscape elements and planting, fencing with
mammal passage points, woodland planting mix, habitat features. All hard and
soft landscaping shall be carried out in accordance with the scheme approved
in writing by the planning authority as the programme for completion and
subsequent maintenance (vii). Thereafter any trees or shrubs removed, dying,
becoming seriously diseased or damaged within five years of planting shall be
replaced in the following planting season by trees/shrubs of a similar species
to those originally required.
Submission: 
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
Page 105 of 118

Page 106

110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
RCC03 Pittendriech Burn Culvert Road Crossing GA 65215-IFL-20-00-DR-C-
100 P04
RCC03 Pittendriech Burn Culvert Bridleway Crossing GA 65215-IFL-20-00-
DR-C-101 P03
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision:  Approve
Matter 5.xiv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xiv.
cross sections of bunds, woodland buffer planting and acoustic fencing. All
hard and soft landscaping shall be carried out in accordance with the scheme
approved in writing by the planning authority as the programme for completion
and subsequent maintenance (vii). Thereafter any trees or shrubs removed,
dying, becoming seriously diseased or damaged within five years of planting
shall be replaced in the following planting season by trees/shrubs of a similar
species to those originally required.
Submission: 
65215-IFL-15-00-DR-C-554 Noise Bund Cross Sections Sheet 1 Rev P01
65215-IFL-15-00-DR-C-555 Noise Bund Cross Sections Sheet 2 Rev P01
65215-IFL-15-00-DR-C-550 Noise Bund Levels and Contours Sheet 1 Rev
P02
65215-IFL-15-00-DR-C-551 Noise Bund Levels and Contours Sheet 2 Rev
P02
65215-IFL-15-00-DR-c-552 Noise Bund Levels and Contours Sheet 3 Rev
P02
65215-IFL-15-00-DR-C-553 Noise Bund Levels and Contours Sheet 4 Rev
P02
Decision: Approve
Matter 5.xv: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
Page 106 of 118

Page 107

planning authority for each phase. Details of the scheme shall include: xv.
specifications for roadside planting and drainage features including cross
sections of roads, footpaths, drainage swales and utilities with adequate
rooting volume for street trees. All hard and soft landscaping shall be carried
out in accordance with the scheme approved in writing by the planning
authority as the programme for completion and subsequent maintenance (vii).
Thereafter any trees or shrubs removed, dying, becoming seriously diseased
or damaged within five years of planting shall be replaced in the following
planting season by trees/shrubs of a similar species to those originally
required.
Submission: 
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 03
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
0117(290)-01-Prot Tree Protection Plan (Plan 2) 
65215-IFL-50-00-DR-C-101 Drainage Layout Sheet 1 Rev P04
65215-IFL-50-00-DR-C-102 Drainage Layout Sheet 2 Rev P04
65215-IFL-50-00-DR-C-103 Drainage Layout Sheet 3 Rev P04
65215-IFL-50-00-DR-C-104 Drainage Layout Sheet 4 Rev P04
65215-IFL-50-00-DR-C-105 Drainage Layout Sheet 5 Rev P04
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
65215-IFL-80-00-DR-C-504 RCC02 Castell Maynes Road Crossing Rev P07
65215-IFL-50-00-DR-C-370 RCC03 Drainage Layout Sheet 1 Rev P06
65215-IFL-50-00-DR-C-371 RCC03 Drainage Layout Sheet 2 Rev P06
65215-IFL-50-00-DR-C-372 RCC03 Drainage Layout Sheet 3 Rev P06
65215-IFL-50-00-DR-C-373 RCC03 Drainage Layout Sheet 4 Rev P06
65215-IFL-50-00-DR-C-374 RCC03 Drainage Layout Sheet 5 Rev P06
65215-IFL-50-00-DR-C-375 RCC03 Drainage Layout Sheet 6 P06
65215-IFL-50-00-DR-C-376 RCC03 Drainage Layout Sheet 7 P06
65215-IFL-50-00-DR-C-377 RCC03 Drainage Layout Sheet 8 P06
Decision: Approve
Matter 5.xvi: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xvi.
ecological enhancements identified within the EIA Report or any repeat
surveys shown on the corresponding detailed landscape plans. All hard and
Page 107 of 118

Page 108

soft landscaping shall be carried out in accordance with the scheme approved
in writing by the planning authority as the programme for completion and
subsequent maintenance (vii). Thereafter any trees or shrubs removed, dying,
becoming seriously diseased or damaged within five years of planting shall be
replaced in the following planting season by trees/shrubs of a similar species
to those originally required.
Submission: 
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 03
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Decision:  Approve subject to condition. 
Matter 5.xvii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xvii.
green network arrangements showing alignment, widths, footpaths, verges
and planting. All hard and soft landscaping shall be carried out in accordance
with the scheme approved in writing by the planning authority as the
programme for completion and subsequent maintenance (vii). Thereafter any
trees or shrubs removed, dying, becoming seriously diseased or damaged
within five years of planting shall be replaced in the following planting season
by trees/shrubs of a similar species to those originally required.
Submission: 
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
Page 108 of 118

Page 109

110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 04
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Approve 
Matter 5.xviii: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xviii.
Tree root protection areas, construction exclusion zones and dwelling
standoffs overlaid corresponding detailed landscape plans. All hard and soft
landscaping shall be carried out in accordance with the scheme approved in
writing by the planning authority as the programme for completion and
subsequent maintenance (vii). Thereafter any trees or shrubs removed, dying,
becoming seriously diseased or damaged within five years of planting shall be
replaced in the following planting season by trees/shrubs of a similar species
to those originally required.
Submission: 
ARBORICULTURAL REPORT 
App 2 Woodland Boundaries & Compartments
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
Page 109 of 118

Page 110

110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Tree Removals & retention Plan Phasing 12.06.2025;
0117(290)-01 Tree Removals & retention Plan Base 12.06.2025
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 04
110238_OP_SE06_DR_H_200 Hard Landscape Infrastructure Zone 6 Rev 04
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 04
110238_OP_SE09_DR_H_200 Hard Landscape Infrastructure Zone 9 Rev 04
Decision:  Approve
Matter 5.xix: Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of hard and soft
landscaping works has been submitted to and approved in writing by the
planning authority for each phase. Details of the scheme shall include: xix.
visual mitigation, including retained landscape and bunding elements within
the EIA schedule of mitigation. All hard and soft landscaping shall be carried
out in accordance with the scheme approved in writing by the planning
authority as the programme for completion and subsequent maintenance (vii).
Thereafter any trees or shrubs removed, dying, becoming seriously diseased
or damaged within five years of planting shall be replaced in the following
planting season by trees/shrubs of a similar species to those originally
required.
Submission: 
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
Page 110 of 118

Page 111

110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 02
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Approve.   
Matter 6: Development shall not begin on an individual phase of development
(identified in compliance with condition 3) until an application for approval of
matters specified in conditions for the siting, design and external appearance
of all residential units and other structures has been submitted to and
approved in writing by the planning authority for each phase. The application
shall include samples of materials to be used on external surfaces of the
buildings; hard ground cover surfaces; means of enclosure and ancillary
structures. These materials will also include those proposed in the area of
improved quality (20% of the total number of proposed dwellings and not any
community/education areas). Development shall thereafter be carried out
using the approved materials or such alternatives as may be agreed in writing
with the planning authority.
Submission: 
110238_OP_SE03_DR_H_200 Hard Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_H_200 Hard Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_H_200 Hard Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_H_200 Hard Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_H_200 Hard Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE10_DR_H_200 Hard Landscape Infrastructure Zone 10 Rev
02
110238_OP_SE11_DR_H_200 Hard Landscape Infrastructure Zone 11 Rev
02
110238_OP_SE12_DR_H_200 Hard Landscape Infrastructure Zone 12 Rev
02
110238_OP_SE13_DR_H_200 Hard Landscape Infrastructure Zone 13 Rev
02
Hard and Soft Landscape Infrastructure 110238_OP_SE0_DR_G_200 Rev 01
Hard and Soft Landscape Infrastructure Overall Plan Zone 1
110238_OP_SE01_DR_G_200 Rev 03
Hard and Soft Landscape Infrastructure Overall Plan Zone 2
110238_OP_SE02_DR_G_200 Rev 03
Page 111 of 118

Page 112

Hard Landscape Infrastructure Zone 4 110238_OP_SE04_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 6 110238_OP_SE06_DR_H_200 Rev 04
Hard Landscape Infrastructure Zone 7 110238_OP_SE07_DR_H_200 Rev 02
Hard Landscape Infrastructure Zone 9 110238_OP_SE09_DR_H_200 Rev 04
Decision: Not approved.   
Matter 8: Development shall not begin on an individual phase of development
(identified in compliance with condition 3) until an application for approval of
matters specified in conditions for a Landscape and Habitat Management
Plan responding to the ecological recommendations, findings and mitigation
measure within the EIA Report (Technical Appendix 6 - Ecology) and in
response to any repeat protected species surveys (prepared no more than 12
months in advance of any application submission) has been submitted to and
approved by the planning authority. The details shall include:
i. Pre-construction, construction phase and operational phase measures to
translate mitigation measures into the design;
ii. Specific retention, protection and restoration proposals for of Pittendreich
Burn;
iii. Proposed measures to minimise human interference to the southern part of
Little Wood;
iv. The quantum, locations and areas for habitat features and details where
these features are constructed or proprietary features;
v. Species Protection Plans for protected species identified in the surveys of
protected species or repeat surveys for protected species;
vi. Measures to mitigate non-native species;
vii. Ecological mitigation measures identified within the EIA Schedule of
Mitigation (Ecology Section) for corresponding species. 
This document should feed directly into working method statements,
protection plans, detailed design and layout for all elements of the design and
site layout including lighting proposals and SUDS as well as landscape
proposals and man-made habitat features. Development shall thereafter be
carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission: 
Landscape and Habitat Management Plan 
Decision:  Approve subject to condition. 
Matter 9: Development shall not begin on an individual phase of development
(identified in compliance with Condition 3) until an application for approval of
matters specified in conditions for a scheme of Tree, Woodland and
Hedgerow Retention and Protection Plan for the corresponding phase has
been submitted to and approved in writing by the planning authority. Details of
the scheme shall include:
i. root protection areas and construction exclusion zones;
ii. dwelling standoff distances of 20m from the corresponding boundary fence
to Little Wood and between 10–15m from individual retained trees on the
foot/cycleway. 
Page 112 of 118

Page 113

Protection and stand-off measures shall also be shown on corresponding
landscape plans. Development shall thereafter be carried out in accordance
with the approved details or such alternatives as may be agreed in writing with
the planning authority.
Submission: 
Arboricultural Report
App 2 Woodland Boundaries & Compartments
Tree Removals & retention Plan Phasing 12.06.2025
0117(290)-01 Tree Removals & retention Plan Base 12.06.2025
110238_OP_SE01_DR_G_200 Hard and Soft Landscape Infrastructure
Overall Plan Zone 1 Rev 02
110238_OP_SE02_DR_G_200 Hard and Soft Landscape Infrastructure
Overall Plan Zone 2 Rev 02
110238_OP_SE03_DR_S_200 Soft Landscape Infrastructure Zone 3 Rev 02
110238_OP_SE04_DR_S_200 Soft Landscape Infrastructure Zone 4 Rev 02
110238_OP_SE05_DR_S_200 Soft Landscape Infrastructure Zone 5 Rev 02
110238_OP_SE07_DR_S_200 Soft Landscape Infrastructure Zone 7 Rev 02
110238_OP_SE08_DR_S_200 Soft Landscape Infrastructure Zone 8 Rev 02
110238_OP_SE09_DR_S_200 Soft Landscape Infrastructure Zone 9 Rev 02
110238_OP_SE10_DR_S_200 Soft Landscape Infrastructure Zone 10 Rev 02
110238_OP_SE11_DR_S_200 Soft Landscape Infrastructure Zone 11 Rev 02
110238_OP_SE12_DR_S_200 Soft Landscape Infrastructure Zone 12 Rev 02
110238_OP_SE13_DR_S_200 Soft Landscape Infrastructure Zone 13 Rev 02
Soft Landscape Infrastructure Zone 6 110238_OP_SE06_DR_S_200 Rev 03
Soft Landscape Infrastructure Zone 9 110238_OP_SE09_DR_S_200 Rev 03
Decision:  Approve 
Matter 10.i : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: i. Drainage and surface water management
arrangements to manage surface water runoff including a ‘wet’ sustainable
urban drainage system pond(s). Development shall thereafter be carried out
in accordance with the approved details or such alternatives as may be
agreed in writing with the planning authority.
Submission: 
Flood Risk Assessment February 2025 
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-101 P04
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-102 P04
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-103 P04
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-104 P04
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-105 P04
Drainage Catchment Layout 65215-IFL-50-00-DR-C-107 P02
RCC03 Basn 4 & 5 Drainage Catchment Drainage Layout 6215-IFL-50-00-
DR-C-379 P04
RCC04 Southern Roundabout Drainage Layout 65215-IFL-50-00-DR-C-470
P03
Page 113 of 118

Page 114

Drainage Layout Servitude 65215-IFL-50-00-DR-C-106 P03
Drainage Longitudinal Sections Sheet 5 65215-IFL-50-00-DR-C-155 P03
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-370 P06
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-371 P06
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-372 P06
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-373 P06
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-374 P06
Drainage Layout Sheet 6 65215-IFL-50-00-DR-C-375 P06
Drainage Layout Sheet 7 65215-IFL-50-00-DR-C-376 P07
Drainage Layout Sheet 8 65215-IFL-50-00-DR-C-377 P04
Drainage Layout Servitude 65215-IFL-50-00-DR-C-378 P04
East Drainage Catchment Layout 65215-IFL-50-00-DR-C-379 P05
Drainage Longitudinal Sections Sheet 1 65215-IFL-50-00-DR-C-380 P04
Drainage Longitudinal Sections Sheet 2 65215-IFL-50-00-DR-C-381 P04
Drainage Longitudinal Sections Sheet 3 65215-IFL-50-00-DR-C-382 P04
Drainage Longitudinal Sections Sheet 4 65215-IFL-50-00-DR-C-383 P04
Drainage Longitudinal Sections Sheet 5 65215-IFL-50-00-DR-C-384 P04
Drainage Longitudinal Sections Sheet 6 65215-IFL-50-00-DR-C-385 P04
Drainage Longitudinal Sections Sheet 7 65215-IFL-50-00-DR-C-386 P04
Pond 5 Drainage Construction Details 65215-IFL-50-00-DR-C-394 P02
Basin 1 Cross Sections 65215-IFL-50-00-DR-C-395 P01
Basin 2 Cross Sections 65215-IFL-50-00-DR-C-396 P01
Basin 2A Cross Sections 65215-IFL-50-00-DR-C-397 P01
Decision:  Approve 
Matter 10.ii : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: ii. Measures identified within the EIA Schedule of
Mitigation (Hydrology & Hydrogeology Section). Development shall thereafter
be carried out in accordance with the approved details or such alternatives as
may be agreed in writing with the planning authority.
Submission: 
Flood Risk Assessment February 2025
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-101 P04
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-102 P04
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-103 P04
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-104 P04
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-105 P04
Drainage Catchment Layout 65215-IFL-50-00-DR-C-107 P02
RCC04 Southern Roundabout Drainage Layout 65215-IFL-50-00-DR-C-470
P03
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-370 P06
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-371 P06
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-372 P06
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-373 P06
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-374 P06
Drainage Layout Sheet 6 65215-IFL-50-00-DR-C-375 P06
Page 114 of 118

Page 115

Drainage Layout Sheet 7 65215-IFL-50-00-DR-C-376 P07
Drainage Layout Sheet 8 65215-IFL-50-00-DR-C-377 P04
Drainage Layout Servitude 65215-IFL-50-00-DR-C-378 P04
RCC03 East Catchment Drainage Layout 65215-IFL-50-00-DR-C-379 P05
Decision:  Approve 
Matter 10.iii : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: iii. Details of the proposed culvert crossing point and
mammal passage. Development shall thereafter be carried out in accordance
with the approved details or such alternatives as may be agreed in writing with
the planning authority.
Submission: 
RCC03 Pittendriech Burn Culvert Road Crossing GA 65215-IFL-20-00-DR-C-
100 P04
RCC03 Pittendriech Burn Culvert Bridleway Crossing GA 65215-IFL-20-00-
DR-C-101 P03
Castell Maynes Road Crossing 65215-IFL-80-00-DR-C-504 P07
Decision:  Approve 
Matter 10.iv : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: iv. Finished floor levels of residential properties
incorporating a freeboard of 0.3m where necessary. Development shall
thereafter be carried out in accordance with the approved details or such
alternatives as may be agreed in writing with the planning authority.
Submission: No housing proposed within this phase. 
Decision: Approve 
Matter 10.v : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: v. Finished floor levels of the primary school to be
raised above the 1 in 1000-year (including 20% blockage) flood level.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: No school proposed within this phase. 
Decision:  Approved 
Matter 10.vi : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
Page 115 of 118

Page 116

approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: vi. All built development, including SUDS and any land
raising to be outwith the 1 in 200 year plus blockage scenario flood level.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission: 
Flood Risk Assessment February 2025
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-101 P04
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-102 P04
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-103 P04
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-104 P04
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-105 P04
Drainage Catchment Layout 65215-IFL-50-00-DR-C-107 P02
RCC04 Southern Roundabout Drainage Layout 65215-IFL-50-00-DR-C-470
P03
Drainage Layout Sheet 1 65215-IFL-50-00-DR-C-370 P06
Drainage Layout Sheet 2 65215-IFL-50-00-DR-C-371 P06
Drainage Layout Sheet 3 65215-IFL-50-00-DR-C-372 P06
Drainage Layout Sheet 4 65215-IFL-50-00-DR-C-373 P06
Drainage Layout Sheet 5 65215-IFL-50-00-DR-C-374 P06
Drainage Layout Sheet 6 65215-IFL-50-00-DR-C-375 P06
Drainage Layout Sheet 7 65215-IFL-50-00-DR-C-376 P07
Drainage Layout Sheet 8 65215-IFL-50-00-DR-C-377 P04
Drainage Layout Servitude 65215-IFL-50-00-DR-C-378 P04
RCC03 East Catchment Drainage Layout 6215-IFL-50-00-DR-C-379 P05
Decision:  Approve 
Matter 10.vii : Development shall not begin on an individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions for a scheme of effective drainage
and flood management for each phase has been submitted to and approved
in writing by the planning authority in consultation with SEPA. Details of the
scheme shall include: vii. No built development over the existing culverted
watercourse along the southern boundary and a buffer maintained.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be agreed in writing with the planning
authority.
Submission:  Site layout 2195/infra/01 c 1:1250  
Decision:  Approve 
Matter 20: Development shall not begin on any individual phase of
development (identified in compliance with Condition 3) until an application for
approval of matters specified in conditions, for separate scheme(s) to deal
with noise mitigation / attenuation from commercial and traffic noise. This shall
include the submission and approval of updated noise impact assessments
for corresponding phases to provide details of stand-off distances, acoustic
bunds, acoustic fencing and any other attenuation measures (including but
Page 116 of 118

Page 117

not limited to glazing, insulation, building fabric, mechanical ventilation & heat
recovery in accordance with Table 4 of BS 8233:2014) to address the noise
mitigation principles within the EIA Technical Appendix 7 - Environmental
Noise Impact Assessment and EIA Schedule of Mitigation (Noise Section),
updated to accord with the following:
i. Daytime noise levels from commercial industrial uses (7:00am to 7:00pm),
from an assessment position 3.5 meters from the facade of any residential
property (1m from the façade in the case of the upper floors), shall not exceed
the background noise level by more than 5dB when rated in accordance with
BS4142:+A1:2019: Methods for rating and assessing industrial and
commercial sound;
ii. Noise arising from the night time delivery of crash vehicles to the existing
commercial use (Coachworks) on Rosewell Road (11:00pm to 7:00am) at any
new residential property with windows open shall not exceed the background
noise level by more than 9dB when rated in accordance with
BS4142:+A1:2019: Methods for rating and assessing industrial and
commercial sound;
iii. Road Traffic Noise shall comply with the criteria for daytime external
garden amenity at 55dB Laeq (16hour) with updated mitigation measures, as
necessary.
Development shall thereafter be carried out in accordance with the approved
details or such alternatives as may be approved in writing with the planning
authority. Any recommended noise mitigation measures shall be implemented
prior to the occupation of the dwellinghouses.
Submission: Noise Mitigation Measures Report 19 February 2025
Decision: Approve 
Page 117 of 118

Page 118

Page 118 of 118