Notice of Meeting and Agenda 
Performance, Review and Scrutiny Committee 
Venue:  Virtual Meeting, 
Date:  Tuesday, 21 June 2022 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone: 
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk 
Page 1 of 96

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item
and the nature of their interest. 
4          Minute of Previous Meeting 
No previous minutes submitted 
5          Public Reports
5.1 Membership and Terms of Reference 3 - 8
5.2 Adult Health and Social Care Annual Performance Report 9 - 18
5.3 Children's Services, Partnership and Communities Annual
Performance Report
19 - 24
5.4 Corporate Solutions Annual Performance Report 25 - 44
5.5 Education Annual Performance Report 45 - 50
5.6 Place Annual Performance Report 51 - 66
5.7 Midlothian Council Annual Performance Report 67 - 74
5.8 Balanced Scorecard 2021-22 75 - 96 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on 20 September 2022 at 11 am 
Page 2 of 96

Page 3

Performance Review and Scrutiny Committee
Tuesday 21 June 2022            
Item No  5.1   
Performance Review and Scrutiny Committee Membership and Terms of
Reference 
Report by Kevin Anderson, Executive Director, Place 
1   Recommendations 
The Performance Review and Scrutiny Committee is invited to:- 
(a) To consider the appointment of a Chair; and 
(b) To note its Membership and Terms of Reference.   
2 Purpose of Report 
This report sets out the Membership and Terms of Reference of the
Performance Review and Scrutiny Committee. 
Date:  7 June 2022
Report Contact: Janet Ritchie
Email: janet.ritchie@midlothian.gov.uk 
Page 3 of 96

Page 4

3 Background/Main Body of Report 
3.1 Membership 
At the Council meeting on 24 May 2022 it was agreed that the Performance
Review and Scrutiny Committee would comprise of all non-Cabinet Elected
Members of the Council: 
. 
3.2 Terms of Reference 
The Performance Review and Scrutiny Committee will be responsible for the
following:- 
Performance Review 
(a) Reviewing performance when viewed against policy objectives arising
from:- 
(i) The Planning and Performance Management Framework and
the quarterly performance reports to committee.
(ii) External inspection reports.
(iii) The Community Planning Partnership and other major
partnership projects.
(iv) Specific performance reports requested by the committee.
(v) Ad hoc performance reports presented to the Committee by
Chief Officials.
(vi) Any other reports of a performance-related nature. 
(b) Making recommendations by formal report to the Cabinet on
unsatisfactory performance highlighted in (a) above. 
Scrutiny 
(a) Monitoring the delivery of corporate improvement programmes and
ensuring that they are progressing in line with corporate aims and
objectives. Reporting findings and recommendations to Cabinet. 
(b) Commenting on decisions and policies agreed by Cabinet and other
committees and the impact they have on Midlothian as an area, and
making recommendations as appropriate to Cabinet. 
(c) Inviting Cabinet and Other Committee members to attend and
elaborate on Cabinet or Committee decisions or proposals. 
(d) Where appropriate eliciting views of partners, service users and/or
interested parties on Cabinet decisions. 
(e) Inviting stakeholders to attend and elaborate on any matter
relating to the Council e.g. Police. 
Page 4 of 96

Page 5

Meetings: 
The Committee will normally meet on a six weekly cycle (subject to breaks f
or the summer recess, Christmas/New Year and school holidays). Special
meetings will also be held for performance reporting. Although the special
meetings will be specifically held to discuss performance reports, normal
agenda items may also be submitted should the need arise. 
The Council will decide on the schedule of meetings for the Performance,
Review and Scrutiny Committee, usually on a rolling annual basis which will
be published. 
Quorum: 
The quorum for meetings of the Performance, Review and Scrutiny
Committee will be 3 Elected Members. 
‘Call-in’ Procedure: 
The following "call-in" procedure shall apply in respect of Cabinet
decisions:- 
(a) a "call-in" need not await publication of the Cabinet minutes 
(b) a "call-in" may only take place where it is supported by a majority of
the members of the Performance Review and Scrutiny Committee; 
(c) each "call-in" must be in writing; specify the particular decision being
called-in and whether this is in whole or in part; state the reason(s)
for the "call-in"; be signed by a majority of the members  of the
Performance Review and Scrutiny Committee; and be delivered to
the Executive Director: Place, before the deadline specified at
paragraph (f) below; 
(d) the Cabinet decision in relation to any item of "called-in" business will
be frozen pending resolution through the process described at
paragraph (h) below; 
(e) the Performance Review and Scrutiny Committee may not "call-in" a
decision where a financial or contractual commitment has already
been entered into on behalf of the Council; 
(f) a deadline of 9.00am, five working days after each Cabinet meeting
will be set for the submission of any "call-ins" arising from the
meeting (e.g. for a Tuesday Cabinet meeting the deadline will be
9.00am the following Tuesday, assuming no intervening public
holidays); 
(g) a Special Meeting of the Performance Review and Scrutiny
Committee may be called to consider "called-in" business where, in
the opinion of the Executive Director: Place, unnecessary delay or
difficulty would otherwise arise;
Page 5 of 96

Page 6

(h) after having considered any "called-in" business, the Performance
Review and Scrutiny Committee shall decide only in accordance
with one of the following two options:- 
(i) Option 1 - To note the Cabinet's decision. (This will have the effect
of immediately unfreezing the “called-in" decision); or 
(ii) Option 2 - To make specific recommendation(s) back to the Cabinet
on the "called-in" item. Such recommendation(s) shall be reported
to the next available Cabinet meeting without the need for prior
publication or approval of the Performance Review and Scrutiny
Committee minutes. Where the Cabinet declines to accept any or all
of these, the matter shall continue to be frozen and referred
simpliciter by the Executive Director: Place to the full Midlothian
Council for determination. Should s/he deem it appropriate, the
Executive Director may call Special Council and/or Cabinet
meetings to facilitate the determination of the matter. 
(i) a "call-in" may be withdrawn only where all of the signatories so
agree and the Executive Director: Place receives written intimation
signed by them to that effect. 
Minutes: 
The Minutes of the Performance, Review and Scrutiny Committee will be
recorded by the Officer clerking the meeting and submitted to the next
ordinary meeting of the Performance, Review and Scrutiny Committee for
approval. They will also be submitted to the Council both for information
and to allow the Council to consider any recommendations contained in
them. Meetings of the Performance, Review and Scrutiny Committee will
also be audiocast subject to the exemptions contained within the Local
Government (Scotland) Act 1973. 
4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no resource implications arising directly from this report. 
4.2 Digital 
Not applicable. 
4.3 Risk 
In accordance with the Scheme of Administration the Council is required to
appoint Members to the various Committees, etc.  Failure to do so could
impede the discharge of business. 
Page 6 of 96

Page 7

4.4 Ensuring Equalities (if required a separate IIA must be completed) 
An equalities impact assessment has not been required in connection 
with this report. 
4.4 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix A – Additional Report Implications 
Page 7 of 96

Page 8

APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
Not applicable 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
There are no direct implications related to this report 
A.5 Involving Communities and Other Stakeholders 
This report does not directly relate to involving communities 
A.6 Impact on Performance and Outcomes 
Not applicable. 
A.7 Adopting a Preventative Approach 
Not applicable. 
A.8 Supporting Sustainable Development 
Not applicable. 
Page 8 of 96

Page 9

1
Adult Health and Social Care Annual Performance
Report 2021/22 
01. Progress in delivery of strategic outcomes
21/22: 
Our Vision: People in Midlothian are enabled to lead longer and healthier lives. 
Our Values: Right support, right time, right place. 
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes
all community health and social care services for adults in Midlothian and some hospital-based services such as
Accident and Emergency. 
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP is
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. Work to complete the IJB Strategic
Plan 2022-25 continued in Q4 and this will be published in April 2022. Consultation and engagement in the
development of the plan included the views of over 3000 people, with the feedback received shared on an ongoing
basis with all planning leads and senior management to ensure this could be taken into account in the finalisation of
the plans. A summary of Consultation and engagement across the development of the plan can be found in the
Midlothian Integration Joint Board Strategic Plan 2022-2025 Consultation Report. 
1. HSCP COVID-19 Response
Covid-19 continues to bring challenge and disruption across the Health and Social Care Partnership, its partners,
and the communities it serves. While the challenges we face may have changed since 2020, the need to adapt and
flexibly respond to both new and evolving challenges in health and social care has continued throughout 2021, and
into 2022. This has resulted in increased demand and sustained pressure across the whole system. The main
challenges in Q4 were the Omicron variant and the subsequent spread of infection within the community, staff
absence, and both care home and ward closures relating to covid outbreaks. There was increased anxiety and
pressure on many service users, unpaid carers and staff. 
Even in the most challenging of circumstances, teams have continued to work flexibly, collaboratively, and
innovatively to manage this demand. By working together, services taken steps to reduce inappropriate admissions,
reduce length of stay, facilitate earlier appropriate discharge and reduce unnecessary delay wherever possible. 
As we begin to emerge from this most recent peak of infection rates, the Partnership continues to hold the safety of
clients, carers, communities, and staff as its top priority. Services have been able to continue to adapt and find new
and innovative ways to deliver service offers effectively and safely. In Q4 some services again had to adapt in how
they operated with changes to service delivery and reduced face to face contact where feasible. Many services have
increased the number of video consultations, adopted new digital approaches and taken a proactive outreach
approach. Reduced opportunities for carer respite have remained a concern. 
Despite the challenges faced by all our services, staff and partners, the opportunity to work together in new ways
has helped develop our existing and build new community connections. Volunteering programmes continued and
were further supported by the Partnership. 
2. Seasonal Flu/COVID Booster Programmes 
The Health and Social Care Partnership also leads the ongoing COVID vaccination programme which includes
Evergreen (1st and 2nd COVID doses), 12-15 years olds, 3rd dose for people who are immunosuppressed and the
Booster programme. Evergreen offer of Covid vaccine will continue. 
The covid spring booster programme for those aged 75+, care home residents, and those 12+ years who are
severely immunosuppressed is underway and comes to a close on 30.06.22. There has been around an 89% uptake
of the over 75 population. By end of March 2022, 59,099 adults in Midlothian had received a booster. 
Performance Review and Scrutiny Committee 
Tuesday 21 June 2022
Item 5.2
Page 9 of 96

Page 10

2  
The successful housebound programme to reach people over the age of 75 along with care home vaccinations was
completed ahead of schedule. The 5–11 year-old vaccination clinics commenced in March and continues with a 69%
DNA (did not attend) rate. This is an improvement from the start of the programme, likely due to children either being
covid positive or post infection period. 2nd doses are due to commence in June 2022. 
The Gorebridge vaccination centre closed, and the building is once again operating as a Leisure Centre. All
vaccinations are now being delivered from Midlothian Community Hospital (MCH) until the new permanent
vaccination centre is open. 
As part of the Vaccination Transformation Programme (VTP), and in collaboration with the Community Treatment
and Assessment (CTAC) team, work progressed across Q4 to ensure the successful transfer of the vaccination
programme from GPs to the HSCP from the 1st April 2022. The team have developed and progressed work on the
future vaccination model, planning for winter 2022/23, scheduling, and our inclusivity plans for covid vaccinations
across Midlothian. 
3. Service Transformation
Services have continued to deliver transformation across Health and Social Care to shift the balance of care to the
community and reduce admissions. As a result of collaboration and joint working, Cherry Road Day Service had
adapted to best meet the needs of people and communities. The team are delivering regular weekly workshops in
Rosewell, Gorebridge, Mayfield and Dalkeith. Meaningful activities in local spaces and places have provided a
shared community purpose and opportunities for connection. The workshops have included sensory sound sessions,
product design, live music and textiles. 
Midlothian Community Respiratory Team (CRT) has completed preparations to launch the Dynamic Scotland
project. This is a digital service offer targeting patients who frequently attend our unscheduled care services, and
those who are admitted to hospital due to COPD but not currently known to the CRT team. This project takes a
proactive outreach approach aiming to reduced hospital attendances and avoid admissions or reduce length of stay
by supporting people to be able to better self-manage COPD in the community. 
Midlothian became a member of the new associate programme for Distress Brief Intervention (DBI), and recovery
practitioners are actively working alongside the Midlothian Intensive Home Treatment Team (IHTT) to support
individuals experiencing distress, emotional pain and crisis. Dialectical Behavioural Therapy (DBT) has continued to
provide essential support for those who are at most risk of serious self-harm to remain in the community through 1:1
and group intervention. 
A proposal submitted by the Midlothian and East Lothian Drug and Alcohol Partnership was successful in securing
funding to support the implementation of the Medication Assisted Treatment (MAT) Standards. As key areas for
intervention and prevention in relation to near fatal and fatal overdose, this work will provide rapid access to services
at our No.11 Hub and outreach into the communities in Midlothian that are most effected by deprivation. 
4. Justice Service
Activity during Q4 continued to focus on recovery and our response to the COVID-19 pandemic. Service delivery
focused on managing individuals in the Justice system through a mixture of face-to-face and virtual meetings. This
continues to be based on dynamic assessments using risk and needs to determine levels of involvement. The
Justice team are continuing to design alternatives to prosecution/Court disposals. Structured Deferred Sentences
offered to the Court by the Justice team have been reviewed and streamlined. Change Grow Live and Venture Trust
have been identified as offering structured interventions to individuals involved in the Justice system. Further, Stride
and Spring- our gender specific group work programmes are offered to individuals on Structured Deferred Sentence.
It is anticipated that this will increase the options for assisting with the backlog of cases within the Court system and
provide better outcomes for individuals in the Justice system. Further conversations with colleagues in the Courts
have progressed the design Midlothian’s Bail Service including Supervised Bail and Electronic Monitoring Bail. It is
intended that those will be fully operational by the next quarter. 
Q4 saw a continuation of unpaid work service users completing their hours. Our contract with third sector
organisation, Cyrenians to provide work placements in Bonnyrigg community garden has been extended for a further
year after receiving additional Scottish Government funding for engaging with the third sector providers. Further, a
pilot project to increase training opportunities with a local college has proved beneficial to a number of individuals
within the Justice System. The Unpaid Work Team has continued to develop and implement its training pathway for
clients subject to a Community Payback Order with an Unpaid Work Requirement. This pathway starts with all
Page 10 of 96

Page 11

3
clients undertaking SCQF award at level 4 in Health & Safety as part of their standard induction onto their Order.
The pathway allows clients to undertake further SCQF qualifications including: first aid, advanced health & safety
training and manual handling. Working with the Community Lifelong Learning Team (CLL) a further pathway has
been developed to allow clients to undertake a variety of training courses including; an adult achievement award,
CSCS card, digital skills, an introduction to wellbeing or to work improving clients’ literacy and numeracy skills. 55
clients have now completed a total of 83 certified courses. 6 clients completed an intensive 8 week training course
working in a community garden undertaking 7 qualifications organised and delivered by each agency. 4 of the 6
successful clients applied to College continuing into further and higher education. In addition, to developing training
opportunities clients benefited from increased self-esteem and confidence from this course. Here is a case study for
a successful client: “Ms X completed a ‘Health and Safety in the workplace (at SCQF Level 4)’ qualification (in-
house) within the first week of attending her Unpaid Work. Following this, Ms X then successfully gained her
Emergency First Aid qualification. As Ms X was interested in working within the construction industry, she was then
supported by the Unpaid work team to apply for her Individual Training Account (ITA) funding online, before being
directed towards Midlothian’s Communities Life Long Learning (CLL) Team to complete her CSCS course. After
gaining her CSCS card, she was supported to apply for labouring jobs through local agencies. Ms X was then
offered three different labouring positions and accepted one of the full time contracts. As Ms X has also successfully
completed her Unpaid Work Order and gained many qualifications and transferrable skills in the process, she is now
able to focus on progressing in her first, full-time, permanent labouring job." 
The Justice specific Men’s service launched in September 2021. Stride is a holistic trauma-informed group for men
involved in the Justice system. To support the delivery of this service, Justice identified funding to recruit a health
and social care practitioner. The service has completed three rounds of group work to date with further sessions
planned. Some of the intervention delivered by Stride mirrors the work being undertaken by Spring, our women’s
service. Spring continues to support women and has been able to re-establish group work activities. Both group
work services remain under constant review and service delivery is shaped following analysis of evaluation data
provided by participants. 
Our funded Peer Support Coordinator role has now been recruited to and the post holder has led two peer volunteer
training programmes to date. This has increased the number of volunteer peers available within Health and Mind to
support No 11 patients, clients and service users. Future plans for peer activity include plans to look at developing a
football team and a music therapy group. 
5. Substance Misuse 
Key services based in Number 11 in Dalkeith continued to provide services including outreach treatment, injecting
equipment provision [IEP], naloxone, information/advice. Despite Covid restrictions and the impact of Covid related
sickness and absence, impacting service delivery, the Midlothian Substance Use Service instigated an outreach
model to those individuals who were most at risk. This includes the provision of Buvidal [an injectable form of
Buprenorphine]. 
Medication Assisted Treatment (MAT) Standards
In June 2021, the Medication Assisted Treatment (MAT) standards were published by the Scottish Government. 
The standards provide a framework to ensure that the provision of MAT is safe, effective, acceptable, accessible and
person-centred to enable people and their families to benefit from high-quality treatment and care including
psychological and social support. The Scottish Government have required local partners and services to focus on
the delivery of MAT Standards 1 to 5. These are to be embedded by April 2022 and implemented by April 2023. 
For the summary of all the standards and the detail about Standards 1-5, please click on the link below: 
www.gov.scot/publications/medication-assisted-treatment-mat-standards-scotland-access-choice-support/. 
MAT Funding
In order to support local areas to implement MAT Standards [initially 1-5 & 7], the Scottish Government has created
a MAT Implementation Support Team (MIST). MELDAP has been successful in securing new annual investment for
4 years of £246,115. This has been augmented by £57,691 funding annually for the same period from MELDAP.
This funding package [total £303’876 will assist with the implementation of the MAT Standards. Recruitment of
HSCP/3rd Sector staff is underway. These staff will focus on supporting people into treatment, increase the level of
support and improve retention in services. These being key areas for intervention and prevention in relation to near
minimising drug related harm. 
Naloxone 
Accidental overdose is a common cause of death among users of heroin, morphine and similar drugs, which are
referred to as opioids. Naloxone is a drug which temporarily reverses the effects of a potentially fatal overdose with
Page 11 of 96

Page 12

4
these drugs. Administering Naloxone provides time for emergency services to arrive and for further treatment to be
given. Following suitable training by our frontline support and treatment services, ‘take home’ Naloxone kits
(hereafter referred to as ‘THN’ or ‘kits’) or Nyxoid [Nasal Spray] are issued to people at risk of opioid overdose, their
friends and family and service workers in order to help prevent overdose deaths. Any member of the public over the
age of 16 can be trained in the use of Naloxone allowing them to carry and administer it as well as recognise the
signs of someone who may be experiencing an overdose. 
Should someone be given Naloxone and are not experiencing an opioid overdose then they will not be harmed by
Naloxone in any way. In addition the Lord Advocate has issued guidelines and legislation was amended in June
2020 to allow this to happen. 
Midlothian and East Lothian Drugs and Alcohol Partnership (MELDAP) has a primary aim to coordinate the design,
delivery and evaluation of drug and alcohol services across East Lothian and Midlothian. 
MELDAP is currently working with Midlothian Council to: 
. Promote Naloxone training and carrying amongst their staff group. 
. Include Naloxone training and carrying with the 1st aid trainers course. 
. Look to try and ensure that there are Naloxone trained members of staff within all public facing buildings where
possible. 
Staff would be volunteering for this training, there would not be any compulsion to carry Naloxone 
There continues to be concerns about the availability in some communities of what would appear to be illicit
Diazepam tablets and also Etizolam and Alprazolam [Xanax] whose quality is variable but would appear to be much
stronger. These tablets are likely to be used in conjunction with other drugs [poly drug use] increasing the level of
risk. Alerts and Intelligence continue to be shared between Police Scotland, MELDAP and Drug Treatment and
Support services to ensure that officers/workers had information to support harm minimisation information and
support to people who use drugs. MELDAP services have developed and distributed electronic and other versions of
information highlighting the risks caused by poly drug use. MELDAP services continue to provide data packages,
basic smart phones and tablets to those individuals as part of impacting the digital inequalities agenda. The
partnership has continued this work in 2021/22. All MELDAP services are continuing to provide the Covid driven
practice developments that have proven useful to their clients/patients as restrictions ease. One particular area is
providing a blended care approach of one to one engagement augmented with the use of digital/phone platforms
according to choice and need. 
6. Digital 
Technology offers a range of tools to support pathway and service redesign in terms of both iterative improvements
and transformative initiatives. We continued to proactively engage with the emerging digital agenda in Scotland to
maximise the value that technology, in all its forms, can add. The HSCP is also maturing and developing its
approach to digital development. Towards the end of 2020 it appointed a new Digital SRO to the Executive Team to
ensure digital is championed by constant presence at the highest levels in business planning. In March 2021 our
SMT approved a Digital Delivery and Implementation Plan (now in consultation period). This document outlines eight
key priority areas and creates the necessary bridge from strategy to enable coordinated and effective action by
establishing the clear and urgent need for a Digital Programme to focus digital transformation on change (not
technology). The commitment by the SMT to stand-up a change programme is significant step forward and it also
changes the governance arrangements. Wi the approval of Digital Implementation and Delivery Plan, the Digital
Governance Group (established in May 2020), has fulfilled its purpose to “influence, support, and shape digital
development for Midlothian Health & Social Care Partnership”. To progress the plan, and continue with the group’s
responsibilities and objectives, the Digital Governance group (having been fully consulted) will be reformed into a
Digital Programme and Oversight Board to progress the Digital Plan. This will unite all digital projects within the
partnership under a single board and for that board to be positioned within a redesigned HSCP governance structure
which seeks to strengthen planning and transformation across our IJB focus areas grounding aspiration with
application. These changes realise a framework for our previously stated ambitions to be able to present a united
front to and for our key business partners with regard to digital development planning and to support prioritisation
and to position digital within our newly published IJB Strategic Plan as an enabler of transformation rather than a
service or resource to demonstrate the paradigm shift required to deliver digital transformation. 
7. Learning Disabilities
Work continues to ensure Midlothian compliance with the national timescale for the reduction of inappropriate
hospital admissions, delayed discharge, and out of area placements for people with complex care needs. Midlothian
remains in a relatively good position in this respect as a result of the housing programme, the work overseen by the
Page 12 of 96

Page 13

5
Positive Behavioural Support Steering Group, partnerships with third sector organisations specialising in support for
people with Complex Care needs in local communities, and the development of local intelligence about people at
high risk of family or placement breakdown. The tenancies at Teviot Court were cited as an example of good
practice in ‘Coming Home Implementation: report from the Working Group on Complex Care and Delayed
Discharge’ (Scottish Government- Feb 2022). The flats at Bonnyrigg High Street are scheduled for completion mid-
2023. Designs for Primrose Lodge in Loanhead are complete and the property is now vacant. 
The Midlothian Learning Disability Planning Group is supported by ‘Expert Panels’ that draw together experts,
including people with lived experience, to develop solutions in implementing specific areas of our Strategic Plan. As
part of Equal Midlothian Week the Human Rights Panel, led by People First Midlothian, held the first of a series of
Human Rights sessions focussing on Supported Decision Making and how we can support people to feel fully
engaged in decisions about their lives. 
The Day Service review and redesign work has been somewhat held up by the limitations imposed by COVID 19
guidance, but we now expect services to be at or near capacity over the coming two months 
8. Older People
Extra Care Housing: As with many other areas, Midlothian faces many challenges in addressing the housing and
care needs of an ageing population with increasingly complex requirements. Extra Care Housing is a model of
accommodation and care that supports people to live in their own tenancy. Work was progressed on 3 sites
(Dalkeith, Bonnyrigg and Gorebridge) to provide 106 ECH bungalows or flats. Timescales were impacted by Covid
19 but completion dates are still estimated as late 2022 (Dalkeith) and spring/summer 2024 (Bonnyrigg and
Gorebridge). 
Care Homes: Midlothian has 10 older people’s care homes, 2 of which are HSCP run with one being an intermediate
care facility. The remaining 8 are privately run either by private companies, charitable organisations or independent
care homes. Health Boards and local Health and Social Care Partnerships continue to carry responsibilities for the
clinical and professional oversight of the care provided to people resident in care homes in line with the Scottish
Government guidelines (May 2020). 
The Care Home Support Team has provided substantial support to care homes for older people to address the
challenges faced throughout the Covid-19 pandemic. Examples include the provision of direct support to meet
staffing challenges, input to meet the complex care needs of individual residents, vaccination, testing of staff and
residents, support with the reintroduction of visiting and providing practical and emotional support to staff affected by
the impacts of the loss of residents in unprecedented numbers. 
Care at Home: Care at Home continues to be a key contributor to the HSCP vision for people to receive the right
care in the right place; in their home and community as far as possible. It supports efforts to reduce length of hospital
stay, as well as admission avoidance. Care at Home is currently provided by the HSCP and external providers.
Midlothian experienced significant pressures within Care at Home services over the last 12 months. This was in line
with the national challenges to recruit care staff. Despite this pressure, Care at Home worked hard to ensure
packages of care continued to be delivered. On 1st September new contracts were awarded to external Care at
Home providers. Work has been ongoing with the new providers in order to implement the contracts effectively. 
9. Carers
In early 2021 services were re-commissioned in line with changes in Carer’s Act legislation and the carer support
service review and consultation undertaken in 2020. The new contracts were implemented 1st July 2021 with
VOCAL Midlothian and British Red Cross as key agencies. The key themes of the contacts are: (i) Carer
Identification, Information and Advice Services (including financial advice) and (ii) Carer Health and Wellbeing
(including breaks from caring). 
A series of workshops held in the summer of 2021 supported collaborative discussions on how best to utilise the
Scottish Governments announcement of additional funding for carers. Feedback and consideration of how proposals
met strategic aims or supported existing work was fed back to SMT and the Performance and Finance group.
Progress is now being made towards payment of carer additional resource allocations to community partners; target
would be for this to be in place for payment during Q1. 
The 3 year Carers Strategic Plan and associated action plan developed this year sets out the activity being
undertaken in the partnership to reduce barriers and inequalities, such as: access to information and advice services
Page 13 of 96

Page 14

6
(income maximisation); accessing health and wellbeing supports (counselling services; access to Community Health
Inequalities Team nurses); and supporting breaks from caring. 
In very recent weeks the newly developed residential respite resource within Cowan Court has started to
accommodate people to enable carer respite on a limited basis (Monday to Friday stays). Lack of residential respite
for older people remains a particular challenge, and demand for access and carer stress remains evident. Short
Breaks funding that is provided by the HSCP and distributed by VOCAL remains in significant demand. 
10. Mental Health
The Mental Health Strategic Planning group developed the Mental Health Action Plan reflecting the priorities set out
in the Midlothian HSCP Strategic Plan. Primary Care Mental Health Nurses are now in 12 practices across
Midlothian and we have appointed to the OT role to supplement the service. Evaluation of the impact of primary care
nurses is ongoing and is a blend of quantitative and qualitative data. Current findings are positive. 
Individual Placement Support has been impacted by Covid 19 however the service is providing assessment and
support to 8 individuals who are seeking employment and/or Further Education. 
Health in Mind continue to deliver along with Primary care Mental health team social prescribing however
unfortunately due to the restrictions still in place with Covid 19 unable to progress with a large-scale group. Further
exploration of alternative options being explored. 
Mental health Support
As part of Mental Health Strategic direction one of our many aims was to review and evaluate our front door access
to mental health support. Over the last 12 months we successfully re commissioned our third sector services to
enable the delivering of Mental Health support across the county rather than in a single point. Heath in Mind are now
delivering a variety of support, 1:1, peer, group across various venues across Midlothian reaching out to our
communities. 
Mental health and Resilience Service (MHARS) 
One of our largest pieces of work that we continue to implement in phases and hope to fully deliver by the summer
of 2022 was the redesign of our current Intensive Home Treatment Team (IHTT), We began mapping out and
looking at how to transform our front door access for individuals who are experiencing an acute/relapse of their
mental illness and/or crisis and distress with their mental well being. Along with this new direction for Midlothian, we
were also represented on the Pan Lothian Redesign of Urgent Care (RUC) with the Scottish Government, again this
piece of work was around an Individual having access to the right person at the right time. We are pleased to say
that part of this process we identified the staffing resource gap in IHTT to enable full commitment to the RUC, we
were successful in our bid for additional resource and staff have now successfully been recruited to those posts.
Midlothian continues to be part of the ongoing works in relation to the RUC and how this will be delivered. 
Locally over the last 12 months workshops/meetings were held with staff in IHTT to look at what we do, how can we
improve and what the Gaps were. One of the outcomes we identified was around developing a self referral single
point of access. The initial phase of this plan was for Midlothian to become the first local area in Lothian out with the
National service for Distress Brief Intervention (DBI). We successfully Commissioned Penumbra to deliver this in
partnership with the Intensive Home Treatment team. There have been some challenges with staffing recruitment
but please to say this is resolving and we have now been in a position to develop an Implementation action plan
which we have been working on with staff. Along with this IHTT in its current form will be separated into two areas,
MHARS and Home treatment (which is the part of the service that will continue to deliver intensive support for
individuals who can be supported at Home as an alternative to hospital admission) , The staff who work in IHTT will
rotate between the two parts of the serivce. 
Our aim by the summer (July) of 2022 
Midlothian will continue be the first area within Scotland to have both Health and Third sector working alongside
each other delivering a self referral same day access service for individuals who are experiencing concerns with
their mental health, crisis and distress of their mental well being. MHARS will operate 8am-22.00hrs all year round. 
There has been a lot of interest in what we are doing here in Midlothian and we are at the forefront of how services
may look for mental health in the future. 
11. Adults with Long Term Conditions, Disability and Impairment 
Page 14 of 96

Page 15

7
Awareness training sessions for HSCP staff, provided by Deaf Action and Sight Scotland have also not been
possible due to the pandemic and training over Zoom or Teams cannot provide practical, hands on training. Sight
Scotland continue to provide information sessions to staff in relation to the services they provide. Work has
commenced with Deaf Action to review the work being undertaken. 
In response to the closure to the public of the Audiology Department due to Covid restrictions volunteers continue to
uplift peoples’ faulty hearing aids from their homes and delivered the aids to Midlothian Community Hospital for an
Audiology technician to repair, and then return the repaired aids back to the individuals. 
Hybrid model up and running for delivery of face to face and digital for all weight management programmes. Digital
devices secured for people referred so they are able to decide what options best suits their needs. 
Midlothian ICJ has been operational for one year. A total of 91 people have used the service. Our aspiration by the
end of our first year of being operational was to reach 30% of newly diagnosed people, which for Midlothian meant
161 people. While we have not met that target, referrals have increased gradually, apart from a dip in December &
January. Our monthly target is 13 people per month and in November this was achieved. In the last quarter we have
reached 31 people, so 10 people per month choosing to use the service. Over 50% of people are from SIMD 1 & 2.
As 42% of people live in SIMD 1 & 2 in Midlothian, this data suggests that the service is demonstrating good reach.
Referrals before Christmas were, in the main from CNS colleagues as we as third sector services. In this last
quarter, we have seen an increase in self referrals with 47% from this route. The uptake rate in the last quarter was
over 90%. 
12. Sport and Leisure 
The ongoing restrictions around schools has resulted in the continued general closure to the public of Newbattle
Community Campus and The Lasswade Centre during school hours although in Q4 strictly limited access has been
afforded at both sites during the day allowing some access to gym and swimming pool users on a controlled basis.
These restrictions are expected to end by mid-April 2022 when normal day-time access will resume. Gorebridge
Leisure Centre was utilised as a mass vaccination centre until 03/04/22 and began to operate as a leisure centre on
11/04/22 with the gym re-opening. The remaining activities/spaces will follow in due course following
recommissioning works. 
All other sites have been operating as near to “normal” as possible with the re-introduction of a wide range of
programmes and activities on offer, including swimming lessons, fitness classes, MAC classes, Ageing Well
activities as well as accommodating local sport/activity clubs and organisations. 
The Ageing Well programme of activities is nearly back to pre-covid levels in terms of the range of activities on offer.
Participation and volunteering levels have been good but there has been an inevitable turnover of participants who
cannot or who do not yet wish to return and the case is the same for volunteers, however the resumption of a much
fuller programme has also seen a good number of new participants and volunteers access the project. 
Sport & Leisure Services has supported Midlothian HSCP colleagues in delivering Physiotherapy programmes and
Let’s Prevent, the Type 2 diabetes prevention programme by accommodating and integrating those services within
Sport & Leisure facilities. Sport & Leisure Services via its Ageing Well and MAC programmes is directly involved in
the Falls Prevention strategy and pathways for those experiencing or at risk of falls. The MAC team have also
resumed delivery of the Tier 2 Weight Management Programme at Newtongrange Leisure Centre. Delivery is not
back to pre-covid levels due to staff vacancies and facility availability at Newbattle and Lasswade centres however
virtual delivery commenced in Q4. NHS Weight Management have advised that the waiting list is currently very
small. 
Sport & Leisure services will continue to develop its digital capabilities including an expanded role out of online
booking and advance payment for all activities, online fitness classes and activities as well as deploying digital
platforms such as MS Teams for internal and external communication and workforce training and development.   
02. Challenges and Risks
COVID-19 
The Health and Social Care Partnership, its partners and the communities it serves continued to be impacted by the
COVID 19 pandemic. Covid continued to influence how the HSCP delivered core services, it impacted on staff
Page 15 of 96

Page 16

8
absence and deployment, and it required additional resource, for example to deliver vaccination clinics, coordinate
staff testing for HSCP and other staff, and manage PPE provision locally. 
A growing and ageing population 
Midlothian is the second smallest Local Authority in mainland Scotland but the fastest growing. This will continue to
pose challenges for health and social care services whilst also changing some local communities. As people live for
longer many more people will be living at home with frailty and/or dementia and/or multiple health conditions. An
increasing number of people live on their own, and for some this will bring a risk of isolation. 
Higher rates of long-term conditions 
Managing long-term conditions is one of the biggest challenges facing health care services worldwide, with 60% of
all deaths attributable to them. Older people are more susceptible to developing long-term conditions; most over 65s
have two or more conditions and most over 75s have three or more conditions. People living in areas of multiple
deprivation are at particular risk with, for example, a much greater likelihood of early death from heart failure. They
are also likely to develop 2 or more conditions 10-15 years earlier than people living in affluent areas. 
Higher rates of mental health needs 
Many mental health problems are preventable, and almost all are treatable, so people can either fully recover or
manage their conditions successfully and live fulfilling healthy lives as far as possible. The incidence of mental
health issues in Midlothian, while similar to the rest of Scotland, is a concern. Living in poverty increases the
likelihood of mental health problems but also mental health problems can lead to greater social exclusion and higher
levels of poverty. People who have life-long mental illness are likely to die 15-20 years prematurely because of
physical ill-health. 
Our services are under pressure 
People place a high value on being able to access effective health services when they need them. People expect to
receive high quality care services when these are needed whether as a result of age, disability, sex, gender or long
term health conditions. Yet there are a number of pressures on our services. 
Financial pressures
Financial pressures on public services are well documented. There is no doubt that we need to do things differently:
the traditional approach to delivering health and care services is no longer financially sustainable. 
Workforce pressures 
The Covid-19 pandemic has and will continue to influence the demand for, and deployment of, the health and care
workforce for the foreseeable future. Mass vaccination programmes and other large scale recruitment programmes
related to COVID 19 have increased pressure on already stretched resource. 
There is reduced availability of staff with appropriate qualifications or skills, including General Practitioners, Social
Care Workers and Staff Nurses. This impacts on service delivery and development. 
Review of Adult Social Care 
The Independent Review of Adult Social Care (published in February 2021) was set up to recommend improvements
to adult social care in Scotland. It looked at these in terms of the outcomes for people who use services, their carers
and families and the experience of those working in the sector. There are likely to be significant changes to care
services as a result of this review. 
Unpaid carers 
Unpaid carers fulfil significant, valuable and wide-ranging roles within Midlothian communities, helping to keep
people with care and support needs within our communities. During the pandemic many people became carers for
the first time, or saw changes to their caring role, resulting in them providing significantly more care for their elderly,
sick or disabled family, friends and neighbours. Through this period services supporting carers continued to offer a
range of support, including digitally, and by telephone, though services supporting the person they provide support to
may have been reduced, e.g. respite and day services, impacting on carers. Further work is required to reduce the
significant pressure and impact of caring that carers reported, by continuing to explore innovative options to enable
support to be given to both carers and the cared-for, and for there to be opportunities for breaks from caring. 
Acute hospitals Acute hospitals are under huge pressure due to unsustainable demand and financial restrictions.
Investing in community based services and work with carers is required to minimise avoidable and inappropriate
admissions and facilitate earlier discharge. By treating people closer to home, or in their own home the HSCP can
support admission avoidance and improve people’s outcomes.  
Page 16 of 96

Page 17

9  Page 17 of 96

Page 18

Page 18 of 96

Page 19

1
Children's Services, Partnership and Communities
Annual Performance Report 2021/22 
01. Progress in delivery of strategic outcomes
21/22: Year End Report  
Our Vision: All children, young people, adults and families in Midlothian are supported to be the best they
can be. This is achieved through a nurturing, respectful and collaborative approach that promotes
wellbeing, equity and inclusion.  
General 
Over the past year children’s services have seen some significant improvements in the work they have undertaken.
Despite a significant rise in referrals into children’s services we have maintained a lower than Scottish average
number of children on the child protection register and children who have required to be looked after out with their
family the numbers remain very low. This would suggest that our earlier intervention models of intervention are
working. The National Housing Project offered 9 care experienced young people their own permanent tenancy as
they left care and a year down the line all 9 have sustained their tenancy with no issues reported. This is a significant
success and as the project comes to an end in 2023, we need to ensure that we mainstream our approach to
supporting young people leaving care. The evidence is overwhelming whereby if young people are able to get a
secure tenancy their overall outcomes improves due to the stability this brings in their lives. 
Hawthorn Family Learning Centre undertook a full review of the service and has recruited into all the posts. This was
a significant piece of work especially as it was undertaken during covid. We look forward to hearing about how the
service will lead to better outcomes for children and their families. 
Residential staff adjusted their working week to twelve hour shift patterns, to reduce the risk to young people during
the pandemic, this has been so successful they have agreed to continue with 12 hour shifts, knowing this is what the
young people prefer. We welcomed and supported two families fleeing from Afghanistan over the past year. Family
Group Decision Making has become part of children’s services and the team were successful in bidding for external
money in order to grow this team. In line with the Promise we are supporting families to agree their own plan so that
they can stay together. The Family Placement Team were also successful in bidding for external funding in order to
employ someone who will support families who have had a child adopted. 
Within Communities, Lifelong Learning and Employability, the past year has been a challenge with many courses
having to cease or significantly reduce the numbers attending due to the pandemic. However since August 2021
numbers attending and engaging with this service have increased and actually surpassed many of the targets we
hoped to achieve. There have been many grants to support young people and adults into further education, training
and employability. Youth work has opened up in all clusters although there continue to be areas across the county
where finding suitable venues remains an issue. 
Other successes over the past year are the summer family learning programme which was well attended, foundation
apprenticeships commenced and extra places offered. Young Carers were successful in getting additional funding
allowing more young people to attend groups or 1:1 sessions for support. 3 year funding for grants was launched
with a cross party group agreeing who the successful organisations were. 
Children’s services continues to be impacted by Covid and similar to other services has encountered a higher than
average number of staff absences within the workforce. We have managed to sustain and deliver services through
creative and flexible solutions. However, for the most part, especially in our children’s houses we have relied heavily
on the commitment and dedication of our staff to go above and beyond the call of duty. Staff continue to work on a
rota basis within Eskdaill Court until such times that Scottish Government guidance allows for a return of all staff. In
summary our staff remain as committed as ever. 
Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.3
Page 19 of 96

Page 20

2
There have been many success within the service over the past year and the strengthened partnership working
within the Children, Young People and Partnership Directorate is key in enabling us to continue to offer the right
support at the earliest opportunity to children, young people and their families within our communities. 
The last year has seen a significant increase in referrals (37%) and we continue to explore and trial different
methods for understanding and managing the varying referral routes and pathways and whether these could be
managed differently. We have also undertaken an audit of the data and in the process of making sure it is as
reflective as it can be of the current challenges. We are also in discussions with comparable authorities and
professional bodies to benchmark referrals and identify solutions although (52% ) of the increase continues to be
linked to financial support, given the economic difficulties around the increased cost of living and fuel and food prices
and the impact this is having on many families within our communities. . 
UNCRC  
Within the People and Partnership Directorate we continue to promote a rights based approach to all our work. We
have just submitted out latest UNCRC report which highlights how we uphold children’s rights which can be
accessed here.  
The Promise 
The Promise is a key driver for moving forward and shaping the future of children’s services. Following a nationally
published report which was initially critical of Councils for what was perceived to be a lack of progress towards the
commitments, Midlothian Council has played a key role in providing CoSLA with information to showcase the work
being done. Our local report was developed around the five priority areas and key milestones which are: 
1. A Good Childhood 
2. Whole Family Support 
3. Supporting the Workforce 
4. Planning 
5. Building Capacity 
The report published by CoSLA includes extracts from the Midlothian Council’s progress report. The Midlothian
Council report prepared for CoSLA can be accessed via the link below: 
https://www.cosla.gov.uk/__data/assets/word_doc/0022/32287/Midlothian-Council-Progress-on-the-
Project.docx  
National Child Protection Guidance The new National Child Protection Guidance has been published. The
national implementation group which Midlothian is part of, is responsible for implementing all the actions and have
already commissioned someone to write local procedures. 
Equity and Inclusion 
The Equity and Inclusion GIRFEC subgroup is well established and a plan has been approved with key areas of
work identified: ASN review, attendance and engagement in education; nurture; poverty and attainment and family
learning. 
Mental Health Services 
The increase in the number of referrals for support for mental health over the past year has proven to be a challenge
across the country. With the additional funding from government we have worked with our third sector colleagues
and developed many opportunities such as nurture and wellbeing sessions, adult counselling, art therapy, family
support and counselling and play therapy to name but a few of the sessions people can access. These groups offer
early support for mental health and wellbeing. Discussions are ongoing to develop a one point of contact for mental
health and family support across the local authority. 
This remains a priority area of work over the coming year. 
Page 20 of 96

Page 21

3
Reducing Poverty 
Within Community Lifelong Learning and Employability (CLLE), Covid has had a significant impact on the service.
Being unable to have youth clubs or young people in school on a regular basis coupled with other restrictions due to
Covid has impacted on the number of people we have been able to support. This said there is a renewed focus on
ensuring we return to pre-Covid numbers as a priority in order to re-engage young people who have experienced
disruption to their education, training and employment opportunities. Identifying and supporting this group is key if
we are to improve their longer term outcomes as they enter adulthood. 
The Community Planning Partnership has approved a one year strategic poverty prevention group, co-chaired by
Dona Milne. The operational child poverty group led by CLLE and Health has completed the final Local Child Poverty
Action Report (Year 3) and this is going through governance arrangements before submission. Child Poverty in
Midlothian has risen by 2.1%. The highest rate of child poverty is in Dalkeith Central and Woodburn 35%. 
The child poverty plan will now focus on poverty prevention and early intervention, particularly income maximisation,
cost of living, income from employment and income from benefits. 
CLLE 
The Draft Midlothian No One Left Behind (NOLB) Action Plan for employability is out for consultation with
employability partners. 
As part of the Community Learning and Development Partnership Strategy increasing our engagement with local
people to pre pandemic levels was a key priority. Our target for 2021/22 was 4000 engagements, by the end of Q4
we have exceeded this by 2233. 2351 of the 6233 engagements were with people and families living in the 40%
SIMD areas of deprivation. It is important to keep this momentum and build local people’s confidence to engage with
us both online, in person and blended going forward. Over the next two years our target is 7,000 plus engagements.
We as a service have also exceeded our target of providing one to one employability or positive destination support
to 861 individuals exceeding our target by 361. The communities’ team have supported 83 groups mainly with
operational support. 
CLLE supporting Asset Transfer and Small Grant  
Vogrie Hall, has been successfully asset transferred to St. David’s Brass Band SCIO enabling them to secure
additional funding to make the building accessible to communities going forward. The CLLE service has worked with
elected members, third sector and community members to score small grants. This provides £89,000 of support to
35 organisations. The impact of this funding is monitored through CLLE nominated grant monitoring officers. 
Supporting local people to secure employment or learning opportunities – Improving skills, for learning, life
and work.  
Our employability programmes for all ages have experienced an increase in numbers of local people accessing
them. There has been an increase in the number of employers accessing the employment recruitment incentive
which we operate as part of our youth guarantee (YPG) support with 81 young people via local businesses
accessing this fund. Through YPG funding we have been able to extend a significant number of Kickstart
Placements. CLLE has secured a contract for 104 foundation apprenticeship level 4/5 places for young people in
Midlothian covering hospitality, automotive and construction. We have advertised 20 opportunities for paid work
placements for the long term unemployed aged over 25. We have also supported 1341 adults or families to engage
with one or more of our 157 learning opportunities offered across our first steps to certificated programmes. We
operate a dedicated parental employability support programme offering support to 177 parents to get into work,
education or training. The adult learning consultation indicates that of the 200 people we spoke to in February and
March. 
The key headlines from the data gathered are; 
72% of respondents were keen to take part in learning over the next year and 52% of them were interested in
gaining new qualifications to support with their employability 
Learners are looking for blended learning models with a greater range of classes available in the evening 
Page 21 of 96

Page 22

4
Supporting young people through youth work and wider learning opportunities  
The youth work service has provided opportunities for 3467 young people, and there are currently waiting lists for
young people to join provision in the Lasswade and Woodburn areas. P7 CLLE operated transitional support to high
school programme has commenced in each cluster. The open Duke of Edinburgh Groups have started the
residential elements of their awards. The CLLE service has developed a water awareness and safety programme for
young people and it operates on a Thursday evening in Newbattle area and Fridays in Woodburn. CLLE supports
the Young Carers project and have supported over 100 young people to prepare their young carers statement and
complete an assessment of need. There are currently lunch time secondary school drop-ins for youth work for young
carers in each cluster. The Bounce project is a diversionary project for those at risk of offending and has completed
working with the second cohort of 10 young people. These young people have not reoffended whilst engaged with
the project. 
Instrumental Music Service  
Following the Scottish Government’s 100 day pledge to provide free music tuition, a review of the Instrumental Music
Service is underway to ensure we can deliver a modern and sustainable service for the future. This review will also
look at the role of visiting specialists in the arts within schools. Consultation with young people, parents and staff is
being undertaken. 
The Youth Music Initiative (YMI) funded by Creative Scotland has the aim of ensuring that every child in Scotland
receives at least 12 hours of free instrumental music education by the time they leave primary school. The YMI has
engaged with a total of 68 pupils in P5 through 3 ensemble projects and a further 2,960 primary school pupils
through Drumming for Excellence. In addition, a pilot Early Years Music Project at Mayfield Nursery has been
successful in engaging with nursery children using music to develop soft skills and pre-reading skills including
recognising sounds, listening, co-operation, self-confidence and self-expression. 
02. Challenges and Risks
21/22: 
National Care Service Consultation 
Decisions around what next have been paused at the moment due to local elections, however it should not be
underestimated the increase in workload this shall evoke when decisions begin to be made around what is in the
NCS and what is not, or indeed if everything is included. This brings increased risk to services and practice as
officers begin to unpick what this means for their workforce and service area. 
Scottish Childhood Interview Model
The new model of joint interviewing children and young people who have been at risk of abuse is welcomed however
to date there has been no additional funding offered to social work teams. The training for this new model is
resource intensive for both social workers, partners and their managers and it is a concern that no additional support
with regards to funding has been forthcoming at this point. The challenge is that within Midlothian we are unable to
offer more staff the opportunity to undertake this training due to other competing demands. 
Impact of Covid-19  
The impact of Covid across the entire children’s service and CLLE remains a challenge. 
During the last two years more children and young people have gone into kinship placements as a result of the
pressures on families. The need to reprioritise resources to ensure there is adequate support in place to support the
kinship carers has placed additional pressure on our social work teams who are already at capacity. In line with the
foundations of the Promise we have aligned staff to other areas of the service so that they ensure earlier support via
Family Group Decision Making which supports families to develop their own plan and identify what support they
require. A plan to extend this service so that we continue to make a difference and improve outcomes for families is
underway.  We are currently pursuing external funding to support this. 
Children’s Services Referral’s 
As already highlighted earlier in the report the significant increase in referrals requires further analysis and a different
approach to supporting the many families who are experiencing financial hardship. Work is ongoing with partner
Page 22 of 96

Page 23

5
agencies to consider how we address form a holistic perspective acknowledging that poverty is a growing area of
concern and potential demand within ours services. Over the course of 2021/22 referrals into Children’s Services
have risen from 6045 to 8287. The largest increase in referral reason was financial requests rising from 975 to 2140
over the twelve month period an increase of 119% . 
Staffing  
As with other parts of the Council the impact of the pandemic has had a significant impact on our staffing with
sickness absence remaining an ongoing area of concern across services. Thanks to the flexibility and commitment
of our staff we have been able to manage this. This should ease as the national Covid position changes. 
Residential Care Homes 
There continues to be a national shortage within the residential children’s workforce in children’s services. This is
particularly so for children who have complex care needs such as autism and ASN. We have had to place children
externally because of the lack of provision across Scotland, these cases relate to external placement breakdowns.
We continue to work with partners to explore how best to meet the current demands and pressure whilst making
sure we future proof our services to deliver sustainable options locally for children and young people with ASN and
Complex and Enduring Needs 
Foster Care As stated previously Midlothian Council’s existing foster carers are an ageing population who are
coming to the end of their fostering carer. While Midlothian Council’s recruitment statistics compared with other local
authorities remains encouraging we continue to seek and explore other options. As identified in Q3 Interestingly, our
potential adopters has more than doubled though the numbers of children awaiting adoption in Scotland has
significantly reduced. We are already in dialogue with these potential adopters regards the adoption landscape and
to determine whether long term foster care could be an option. 
Kinship Care 
Another growing area as discussed at the beginning of the report. In essence, our resources and kinship services
are inextricably linked and rely on each other to rise to the pressure and demands of keeping our children and young
in the local community. 
CLLE  
Our main challenge going forward continues to be access to suitable premises to meet the needs of those engaging
in learning in all age groups including older people; employability support both individually and in groups and the
delivery of youth work in some geographical areas. The lack of tools and platforms to allow people to engage online
and face to face at the same time has still to be resolved although the roll out of Google classroom for all CLLE
learners may help to alleviate some of this. 
Challenges around access to devices and internet connectivity allowing participants to learn online remains a
challenge. The roll out of digital devices to school pupils and the allocation of Connecting Scotland devices to adults
has helped but there are still challenges with the cost of internet access and rising electricity charges for many of our
most vulnerable learners. 
Instrumental Music Service  
Providing free tuition to all pupils whilst having to meet a significant savings agreed within the Medium Term
Financial Strategy will be challenging. We are undertaking an option appraisal which shall consider how we best
deliver and design a service that is modern, implementing the learning during the pandemic, whilst also delivering a
service that is equitable and sustainable. 
The risks and challenges within children’s services and CLLE are highlighted within this report. As we begin to return
to a sense of ‘normality’ across the services the impact of Covid should not be underestimated. This coupled with the
challenges of poverty which will impact on many residents and families shall require us work in partnership with our
voluntary and 3rd sector colleagues and across the council to ensure we are proactive in taking a holistic approach
to supporting and working with families and residents within Midlothian. 
Page 23 of 96

Page 24

6  Page 24 of 96

Page 25

1 
Corporate Solutions Annual Performance Report 2021/22
This year Corporate Solutions continued to support the recovery and the retention of the best elements of
transformation that took place in response to the pandemic and securing permanent changes to the way
the Council delivers its services in order to build back better. This approach is based on the creation of a
wellbeing economy and it is designed to achieve wellbeing and fairness for our people and the rest of
nature. The redesign of services and the changes to build back better are predicated on the overarching
principle that in delivering services, whether commissioned internally or externally, we will keep our
communities, our employees and our environment safe, at the same time as meeting our commitment to
being carbon neutral by 2030. 
Corporate Solutions will “deliver forward looking services fit for a modern 21st
Century organisation and put the citizen at the centre of Service Redesign”.
2021/22 continued to be dominated by the impact of the Covid19 pandemic on our communities and on
the Council itself.  Furthermore financial sustainability continued to dominate the agenda. In their Annual
Audit Report for the financial year ended 31 March 2021 EY, The Council’s appointed External Auditor,
rated Financial Sustainability of the Council as amber. 
EY stated “The Medium Term Financial Strategy (MTFS) meant that the Council had a clear financial plan in
advance of the impact of Covid-19. We anticipate that updates to the MTFS for the 2022/23 budget to be
presented to the Council will continue to rely on one-off measures. A revised MTFS is being developed to
support the new administration in May 2022. 
Our assessment of amber reflects the ongoing challenge facing local authorities and the level of risk and
uncertainty outside the Council’s control which could impact its ability to deliver savings, all of which has
been exacerbated by the ongoing impact of Covid-19.  However, there remains a need for continued
member and officer focus on maintaining financial sustainability and fulfilling the statutory responsibility
of members to determine balanced budgets over the medium term”.  
Subsequent to Council consideration of that report the settlement for Local Government for 2022/23 was
announced in December 2021 and represented a cash reduction in core grant nationally of circa £100m at
a time where costs continue to rise. On 27th January 2022 a further £120 million one off funding was
announced for Local Government. However Councils continue to face a £251m real terms cut which will
increase again in 2023/24 by a further £120m if the one-off funding for 2022/23 is not baselined within the
Local Government settlement. The settlement announced in December gave Councils full flexibility to set
the Council Tax rate that is appropriate for their local authority area. 
It is against that backdrop that the cross party Business Transformation Steering Group considered options
to balance the 2022/23 budget and as part of that the Council Tax policy for the year ahead to enable
Council to fulfil its statutory duty, as set out in Section 93 of the Local Government Finance Act 1992 (as
amended), namely to set its Council Tax and a Balanced Budget for 2022/23 and made recommendations
to Council on 15 February 2022. While Council subsequently agreed a balanced budget and a Band D
Council Tax of £1,442.60. Balancing the budget was reliant of £12 million of one off funding. Accordingly
the recurring expenditure of £251 million for 2022/23 exceeds recurring funding by that £12 million. 
Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.4
Page 25 of 96

Page 26

2
The challenging grant settlement presents challenges not just for the year ahead but over the medium
term, with projections of recurring expenditure to provide services exceeding the recurring funding
available. Projections are that 2023/24 and beyond will require significant service reductions, focusing on
statutory requirements as well as continued service transformation.  
In the year Corporate Solutions went through a period of transition to shift to a structure with six service
areas of Finance, Human Resources, Digital, Customer Services, Legal & Governance and Corporate
Resources. Building on our nine drivers for change, Corporate Solutions has a particular focus on the key
elements of the route map that encompass the delivery and acceleration of the Capital Programme,
delivering digital first and remote working. 
These elements of the Midlothian ‘Route map for recovery through and out of the pandemic’ are also
captured in the recommendations from the NESTA ‘Listen and Learn Report’ and having embraced both
strategies, the Corporate Solutions teams have a key role in progressing the following strands of work: 
• Valuing Communities - Being well together, using social media to engage with
communities; meaningful local engagement, strengthen and build upon emerging ties with
communities and work in partnership to deliver local, place based services.
• Remote/Flexible Working - Local and flexible place based working; working smarter;
sustainable futures; and a tailored approach.
• Digital First - Access to wifi; technical capability; making things easier; digital by default.
As a strategic partner, NESTA, the UK's innovation agency for social good are, through their people
powered results team, supporting us to pioneer new approaches to achieving change and innovation.
These approaches are smarter, faster, more collaborative and more inclusive of citizens and people
working at the front line. This work recognises that people who are closest to services are the experts in
both their own experience and the community they live in, but often don’t have enough influence over
transformation efforts. 
The key activity which underpins this work and which the service is focused on includes:
a) Securing continued financial sustainability and maintaining strong financial management across
the Council through the delivery of the Council's Medium Term Financial Strategy (MTFS)
incorporating Capital Strategy and Capital Investment plans, Reserves Strategy and Treasury
Management Strategy;
b) Nurturing a highly motivated and effective workforce through the delivery of the Workforce
Strategy and the development of Service Workforce Plans;
c) Digital first and embracing data insight and analytics by developing and implementing a
refreshed Digital Strategy and Digital Learning Strategy;
d) A refresh of the Customer Services Strategy and implementation of the online payments and
services (CSP) platform;
e) A refreshed Procurement Strategy and Contract Delivery Plan. 
Remote working brought a range of new challenges but it has by necessity accelerated the adoption of
a range of business tools and systems developments that are supporting our staff to effectively
continue to deliver services. These developments also provide an effective and efficient means to
progress and monitor work and teams performance. The adoption of electronic workflows, for
example, has removed reliance on paper and wet signatures and provides an electronic record of what
Page 26 of 96

Page 27

3
has been carried out by whom and when. Managers and colleagues are using all of the new
technology available to them to maintain contact with colleagues, work collaboratively to deliver
outcomes and to support continued personal development and learning for staff. 
Medium Term Financial Strategy (MTFS)
The core objective of the MTFS is to secure the Council’s financial sustainability during an ongoing period
of financial constraint coupled with acute service demand pressures and increasing customer
expectations. 
The MTFS is not only about balancing the budgets, it provides a means to ensure as far as possible
that the limited resources available to the Council are targeted on delivery of improved outcomes,
particularly against the key priorities of: 
• Reducing the gap in learning outcomes
• Reducing the gap in health outcomes
• Reducing the gap in economic circumstances
•   Reducing Midlothian carbon emission to net zero by 2030 
Achievements 
• Completion of the 2020/21 financial statements and audit. Maintaining a green rating for Financial
Management from EY the Council’s appointed external auditor.
• Completion of 2022/23 base budget and supporting the work of BTSG to consider options to secure
a balanced budget. 
• Presentation to Council in February of a full suite of financial monitoring reports for last quarter
which included an assessment of the financial impact of COVID and an update on Council reserves
linking into budget decisions for 22/23.  
• Throughout the year the finance team have carried out in depth financial input to key projects
embedded in the Medium Term Financial Strategy including Destination Hillend, Early Years
Expansion, and demographic pressures in service areas and the Learning Estate Strategy and in
addition carried out detailed analysis on the impact of the Local Government Finance settlement
following the Scottish Budget announced in December.  
• Throughout the year Business applications have supported various grant funds and payment
schemes supporting businesses and the people of Midlothian including the introduction of the child
disability payments scheme, low income pandemic payments, discretionary grant fund, taxi fund
and ventilation fund, housing payments for tenant grant fund, education early years omicron
impact fund, CLL grant payment YPG training allowances,  milk and healthy snack scheme and in
addition the launch of local support of free bus travel for under 21s. 
• £808,000 was awarded from the Scottish Welfare Fund this year. The increase from last year
reflects the greater uptake of grants at this stage in the pandemic with the 2020/21 values being
suppressed by periods of lockdown. There remained a significant number of applications for
Scottish Welfare Fund. During 2021/22 we received 6,821 applications for Crisis grants of which
3,952 met the criteria and resulted in payments £ 452,000. Community Care grant applications
totalled circa 1,300 of which 483 payments were made totalling £355,000. In addition there were
3,816 applications for Self Isolation Support grants of which 1,628 qualified with payments totalling
£814,000. 
Page 27 of 96

Page 28

4
• Invoice payment performance for Corporate Solutions has remained on target this year with 95%
of invoices paid within 30 days.   
Workforce Strategy
The purpose of the Workforce Strategy is to ensure that the Council continues to have a workforce that is
able to deliver positive outcomes for the people of Midlothian. It sets out an approach to supporting,
developing and reshaping the workforce now and in the future in response to changes as a consequence
of national and/or local issues. It is underpinned by the Council’s values and vision. 
The Workforce Strategy is an important tool to outline the organisation’s approach to articulating how
workforce issues will be managed and ensures the Council has the people and skills to manage change and
deliver services effectively and efficiently. 
Achievements 
• This year we welcomed the Kickstart Scheme which is a new programme aimed at young people
across our communities who are currently unemployed facing long term unemployment. Young
people from the Kickstart programme are already successfully transitioning into permanent roles.
We have 24 placements in total. Cohort 1 have now successfully completed their six month
placement with all going on to secure a positive destination within the Council.
• Positive progress made on the creation of a one-Council approach to organisational wellbeing
including the Making it Happen network launched in February 2022 for the Place directorate. 
• We secured the Healthy Working Lives Award for 9th year running.
• Implementation of the Local Government Workers 2021 Pay Award and Preparation made to
implement the teachers award, agreed in late March in April 2022 Salary Payments. 
• Revised SNCT grievance procedure agreed and resolution procedure for Local Government Workers
amended after consultation with Trade Unions. 
• Transition plan from remote to hybrid working in place and on target for completion in Q1 22/23. 
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to
support the wellbeing of our staff.  
• Allocated one of the limited places on Age Scotland’s age inclusive matrix programme for 2022
which will see us work with senior consultants from Age Scotland to review current practice, listen
to workers of all ages, and maintain energy and focus to address and deliver changes to enhance
the employee experience. 
Digital Strategy and Digital Learning Strategy
Supported by the appointment of SOCITIM Advisory (Society for innovation, technology and
modernisation) as a strategic partner and led by the Digital First Board work progressed to deliver an
ambitious new digital strategy, Digital Midlothian 2021-2023, “empowering People, enabling growth”
aimed at improving the way services are delivered to Midlothian citizens the strategy sets out how local
outcomes will be improved by delivering digital services to digitally connected communities. 
Page 28 of 96

Page 29

5
While responding to the pandemic has also transformed the way the council works, and we are already
using technology to allow our services to be more flexible and responsive it was recognised that the
Council needs to do much more to harness the opportunities that a digital approach can bring.  This
includes supporting our communities and local businesses to thrive in a digital world and making sure that
our children are prepared for the workplaces of the future. 
Among the aims set out in the new strategy are plans to:
• Refresh the council’s approach to customer service, focussing on ‘digital first’, while making sure
alternatives remain in place for those who need them 
• Have a council website that meets customer needs , enabling customers to request and pay for
services online and to log in to see their interactions 
• Implement an update service, so that customers contacting the council online can receive follow up
text messages or emails 
• Look at opportunities to automate and better integrate processes so that staff can focus on the
things that matter most to customers 
• Enable people to stay independent and healthy for longer by using data and technology 
• Introduce bookable online and face-to-face appointments so that customers don’t have to waste
time queuing or travelling and to help the council reduce costs 
• Review and improve online engagement with customers, including online consultations,
communications and social media 
• Promote Midlothian as a digital destination, creating an environment that attracts leading digital
businesses to the area and supporting the innovation of start-ups 
• Cultivate digital skills in our communities, ensuring that young people have access to the
technology and support that they need to improve educational outcomes and to prepare them
with the skills they need for the future 
• Reduce digital exclusion and empower learners of all ages, enabling online access and supporting
them to develop digital skills 
• Support Midlothian to achieve high speed connectivity, smart infrastructure and resilient cyber
defences 
Funding was secured in the 20/21 budget to deliver the Equipped for Learning project, providing every
school age pupil in the county with a learning device such as an iPad or Google Chromebook as part of
Midlothian Council’s £10.5 million investment in digital learning. Midlothian is the first local authority in
Scotland to launch a digital learning project on this scale. 
The ambitious plan recognises the importance of digital tools to support learning. This investment will
ensure Midlothian’s young people have the digital skills they need to secure a positive destination such as
a job or a Further or Higher Education place, which in turn will help support the local economy. Making
sure all pupils have a device will also help young people with additional support needs by giving them
access to technology that can help with their different learning needs. Primary schools will have the
flexibility to select the right device to support their school community until Primary 7 where all pupils from
P7 upward will receive a Google Chromebook. Early years settings will also benefit from the digital strategy
as they will have access to shared iPad devices. 
Additionally, Newbattle Community High School will continue to be the Digital Centre for Excellence in
Midlothian, piloting innovation and creativity in new technologies. This investment will also make sure
Page 29 of 96

Page 30

6
Midlothian’s teaching staff have access to world-class technology, with wider support for other Education
staff, Children’s Services and Communities & Lifelong Learning. 
Achievements 
• Continued progression of the new Digital Services Strategy ensuring the Council has the capacity
and skills to take forward the associated investment and delivery of plans. 
• Equipped for Learning Programme (ELF) project was approved in 2021 and funding in place to
support the delivery, providing every school age pupil in the county with a learning device such as
an iPad or Google Chromebook as part of Midlothian Council’s £10.5 million investment in digital
learning. Significant progress made in supporting Education ambition for 1 to 1 devices with phase
2 complete this year including improvements in Wi-Fi provision across schools to support wider
deployment of chromebooks and underlying technologies. In addition, new EFL web filtering
solution was implemented to support 1 to 1 device deployment.
• Digital enabled projects: a number of business applications have been upgraded and these
continue to improve customer and staff experience. Successful Application upgrades including,
major upgrade of Integra, CivicaPay including Mastercard 3DSecure V2, Civica 360, Open Revenues.
• The completion of the mobile phone replacement programme took place this quarter.  
• Cyber Security resilience: The cyber risk is currently high and a number of improvements have been
made this year to the Councils cyber defences.  Following the geo-politic risks of cyber spill over the
Council has applied NCSC guidance on how to respond to the increased risk, by introducing
additional controls. A number of staff phishing exercises were carried out during this year which
will continue. We achieved Public Services Network (PSN) Compliance in July 2021 and Cyber
Security Essentials was achieved In February 2022. In relation to Cyber Security awareness, a report
was provided to CMT on cyber risk and actions taken and IT Security audit rated overall
satisfactory.
Customer Services Strategy
The Customer Service Strategy defines the key drivers that will enable Midlothian Council to deliver
‘customer service excellence’ to our communities. It outlines the commitment to provide choice to the
customer in the way services are accessed and provided. This includes innovation, partnership working
and optimising the use of technology within resource constraints. The strategy will help us to change the
way we deliver services utilising the latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers using the
current resources, systems and processes. This means that the adoption of digital and automated
processes will be key to continuing to provide a seamless customer journey, satisfying enquiries at the first
point of contact and meeting increased demand. 
Customer self-service and new automated processes can help deliver some key services without
customers dealing directly with a member of staff and could truly transform the way the Council deliver
services. During 2020/21, increasing the pace of digital transformation, particularly in front-facing
Page 30 of 96

Page 31

7
customer services, will be a service and corporate priority, for Midlothian Council – one that can deliver
the required efficiencies without negatively affecting customer experience. 
Achievements 
• Work continues to implement the Customer Services Platform (CSP) for Midlothian Council and
redesigning key services that will improve the end to end customer journey. The modules in
progress (such as missed bins, registrar’s certificates, customer feedback) are being designed,
configured, built and tested with services.  The FOI and EIR module launched successfully this year
and registrars final preparations being progressed for launch.  New technology components for
online payments and for real time reporting are being progressed. Work to progress the Customer
Services Strategy continues in conjunction with the new Digital Midlothian Strategy, NESTA and
neighbourhood services provisions.
• In our library services, groups and activities have continued to resume following COVID restrictions.
Across a number of branches, Book Groups, Reminiscence Groups and Knitting Groups have re-
started with some new groups starting too. Our ‘Braw Blether’ Bibliotherapy sessions have
resumed face to face service and attendance remains steady. The TSB Bank have started a pop-up
session in Dalkeith Library to offer customer’s advice about everyday banking needs. A monthly
Gaelic Bookbug session launched in Loanhead Library providing songs, rhymes and stories in Gaelic.
A further Bookbug success saw Isi Allen, the Customer Service Team Leader at Loanhead Library
shortlisted for the Scottish Book Trust’s Bookbug Hero Award where she was cited as Highly
Commended for the difference she makes to families. Midlothian Libraries were successful in their
application for COVID Relief Funding from the Scottish Government and will be working on a
targeted Bibliotherapy programme. The yearly total of virtual library visits is 225,804, the Q4 figure
is 45,903. With the exception of Lasswade and Newbattle Libraries, all libraries are open to their
pre-COVID hours so in-person provision has increased and therefore virtual visits have decreased
from last year by 46,455 as an expected result. 
Procurement Strategy 
The procurement function, led by our new Chief Procurement Officer who joined in September 2021, has a
central role in supporting the Council to achieve its strategic priorities within a constrained financial
envelope. Procurement allows the Council to repurpose its spending power to drive our key strategic
priorities and to secure the best possible value and outcomes for Midlothian. Effective procurement can
maximise the value of every pound spent in terms of jobs, skills and supply chain opportunities in the local
community. We will aim to address economic, social and environmental considerations at all stages of the
procurement cycle within the rules of open, fair and transparent competition. 
The Procurement team in conjunction with Economic Development have developed a Small & Medium
Enterprise (SME) Strategy to support and assist local businesses to win contracts fairly and transparently
on a competitive market. We will further develop our collaborative and commercial relationships with key
partners as part of our strategic category management approach, to deliver the best possible outcomes for
the citizens of Midlothian. 
The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing
(amongst others) which not only provides an easier route to market but also delivers value for money. The
Procurement team is currently working with Scotland Excel to review the service to ensure it remains fit
Page 31 of 96

Page 32

8
for purpose. We have also explored with neighbouring Councils albeit with limited success opportunities
to collaborate on the joint delivery of procurement services and so will continue to engage with Scotland
Excel to help support service development. 
Achievements 
• Work continues on the development of the SME/Procurement strategy. This year the team have
reviewed and streamlined the non-competitive action process, the request for procurement
process and developed a non-regulated procurement process and new contract database. 
• The team continued to utilise framework agreements with Scotland Excel and Procurement for
Housing (amongst others) which not only provides an easier route to market but also delivers value
for money. 
• A range of high value/complex contracts were awarded this year including Carer Support Services,
and Care at Home recommissioning tender and School Counselling Services tender. 
• Other key activities included the roll out of the benefits system to assist the Council in obtaining
community benefits from contracts, roll out of contract variations for all National Care Home
Providers contract and roll out of contract variations for all Health & Social Care providers
regarding the Living Wage uplift. 
• As part of the Local government benchmarking exercise, the percentage of procurement spend on
local enterprises for 20/21 has increased from that of 18/19 and 19/20. 
Challenges
In addition to the Financial Sustainability challenge referenced earlier challenges for Midlothian continue
with our recovery out of the pandemic, the growing and ageing population and the increasing demand for
services that this brings. Midlothian is projected to have the highest percentage change in population size
of all council areas in Scotland. From 2018 to 2028, the population of Midlothian is projected to increase
from 91,340 to 103,945. This is an increase of 13.8%, which is in contrast to a projected increase of 1.8%
for Scotland as a whole with a 40.9% increase in older people over 75.  In addition, Midlothian has 10
zones which falls into the most deprived areas giving a local share of 8.7% living in the most deprived areas
in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes being built in the
affordable housing bracket, in addition to the expansion in Council house building. This construction will
directly support employment and will see a steady increase in the value of Council Tax received over time. 
The approved Capital Strategy sets out the infrastructure required to meet those demographic pressures
and includes the financial contributions Midlothian will make to the Edinburgh and South East Scotland
City Region Deal. Encompassing five main themes the City Region Deal will bring significant investment
across the regions with total investment of circa £1.3 billion across: 
• Research, Development and Innovation: £751 million 
• Integrated Regional Employability and Skills: £25 million 
• Transport: £156 million 
Page 32 of 96

Page 33

9
• Culture: £45 million 
• Housing: £313 million 
Through the Data Driven Innovation strand the Deal will leverage existing world-class research institutes
and commercialisation facilities in order that Easter Bush becomes a global location of Agritech excellence.
The Easter Bush project includes significant investment in transport infrastructure along the A701/2
transport corridor. In addition, by improving on-site infrastructure at Easter Bush and transport
infrastructure, The University of Edinburgh expects commercial partners will be able to co-locate at scale
to commercialise Agritech breakthroughs. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so
has to reflect the demands of Council services to ensure positive outcomes are achieved in the right place,
at the right time for the maximum benefit to Midlothian.  The extensive capital programme, totalling
£0.8bn, delivers new schools, a record investment in council housing, improved community infrastructure,
investment in the local transport network and in innovative developments such as the new low carbon
heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship
opportunities, opportunities for businesses and communities and families hard-hit by the impact of
COVID-19. These new opportunities help lead the way out of the pandemic and towards a better future for
Midlothian. 
Proposals for a National Care Service 
The Scottish Government’s proposals for and scope of a National Care Service will have fundamental
implications for the community and for Local Government itself.  The wide reaching proposals and aim to
deliver a National Care Service by the end of the parliamentary term will impact on all aspects of the work
of the Corporate Solutions team, including financial implications, both revenue and capital, our asset base,
our workforce, governance and legal arrangements and our digital infrastructure and platforms.   It will
require an immediate focus by a range of officers during the consultation phase and beyond. 
Service Performance 
The COVID pandemic continued to have a direct impact on service performance this year and this
is reflected in some of the service performance indicators set out later in this report.  
Continued increase in numbers of Self Isolation Support Grant applications is taking priority alongside
increased Scottish Welfare Fund applications, leading to increased claim and change of circumstances
processing times as resource is focussed on these areas. 
The level of housing benefit overpayments has reduced as a consequence of the roll out of Universal
Credit and the pandemic which in turn reduces the level of overpayments that can be recovered, although
recovery of overpayments has increased this year from last year from 12% to 14%. 
The contact centre continue to experience a high volume of calls with increased Self-Isolation Grants, 
other support services and an increase in contact this year as services started to resume back to pre-Covid
levels.  An additional 9,101 calls were received this year compared to 20/21. An increase in offline social
Page 33 of 96

Page 34

10
work contact combined with higher number of more complex call volumes and steady contact via online
forms (9,806 this year) and social media (1,657) has resulted in lower percentage of calls being answered
within 60 seconds and therefore higher percentage of calls being abandoned by the customer. 
The average number of working days lost due to sickness absence has increased from 5.84 in 20/21 to 7.85
this year. Of the FTE days lost, 67% was due to long term sickness, 16% self-certified, 17% short term
absence. 
Page 34 of 96

Page 35

11  Page 35 of 96

Page 36

12   Page 36 of 96

Page 37

Appendix 1
Page 37 of 96

Page 38

29
42
108
44 54
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of complaints
recieved (Corporate
Solutions)
97
103
98
115
18/19 19/20 20/21 21/22
Total number of female
employees in top 5%
436,001
272,259 225,804
19/20 20/21 21/22
Number of virtual library
visits
15,624 17,187
23,818 25,718
18/19 19/20 20/21 21/22
Number of Council Tax
transactions recieved online
126
777
2382
1657
18/19 19/20 20/21 21/22
Number of social media
contacts via Contact Centre
11,062
13,880
9,806
19/20 20/21 21/22
Number of webforms
recieved via Contact Centre
10.38%
9.22%
5.90%
9.50%
18/19 19/20 20/21 21/22
Percentage of staff turnover
(including teachers)
1376 1308
994 1035
18/19 19/20 20/21 21/22
Number of Freedom of
Information requests received
(Council wide) 
1,177,939
620,537
808,000
19/20 20/21 21/22
Total amount granted from
Scottish Welfare Fund for crisis
grants and community care
grants (£)
5.84
2.48 3.86 5.3
7.85
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Corporate Solutions - Average
number of working days lost
due to sickness absence
(culmulative)
5,478 6,292
8,121
19/20 20/21 21/22
Number of Scottish Welfare
Fund applications received
301
3,816
20/21 21/22
Number of Self isolation
support grant applications
received
A full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
Corporate Solutions Annual 21/22 performance
report                                       Trend Data
Page 38 of 96

Page 39

169,438
159,591
168,692
19/20 20/21 21/22
Number of Contact Centre
Calls
26 25
38 43
57
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Average processing time for
new benefit claims (Days)
Target (25 days)
6 9
14 16
11
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Average processing time for
change of circumstances
(Days)
Target (8 days)
2.9
4.2 4
2.3 2.7
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Average time in working days
to respond to complaints at
stage 1
Target (5 days)
Our customers have choice in the way Council services are accessed and provided
Channel-shift has increased by the adoption of new digital tools and automated practices
Delivery of customer service excellence to our communities
Our Customers
4 targeted indicators, 9 data only indicators
4 off target
Holistic
Modern
Hub and Spoke
One size fits one
47new Taxi licences applications receivedthis year,4Premise licence.
Key highlights
Work continues on implementing the Customer Services Platform (CSP) for Midlothian Council and redesigning key services that will improve the end to end customer journey. The
modules in progress (such as missed bins, registrar’s certificates, customer feedback) are being designed, configured, built and tested with services.  The FOI and EIR module
launched successfully this year and registrars final preparations being progressed for launch in Q1.  New technology components for online payments and for real time reporting
are being progressed. Work to progress the Customer Services Strategy continues in conjunction with the new Digital Midlothian Strategy, NESTA and neighbourhood services
provisions.
In our library services, groups and activities have continued to resume following COVID restrictions. Across a number of branches, Book Groups, Reminiscence Groups and Knitting
Groups have re-started with some new groups starting too. Our ‘Braw Blether’ Bibliotherapy sessions have resumed face to face service and attendance remains steady. The TSB
Bank have started a pop-up session in Dalkeith Library to offer customer’s advice about everyday banking needs. A monthly Gaelic Bookbug session launched in Loanhead Library
providing songs, rhymes and stories in Gaelic. A further Bookbug success saw Isi Allen, the Customer Service Team Leader at Loanhead Library shortlisted for the Scottish Book
Trust’s Bookbug Hero Award where she was cited as Highly Commended for the difference she makes to families. Midlothian Libraries were successful in their application for
COVID Relief Funding from the Scottish Government and will be working on a targeted Bibliotherapy programme. The yearly total of virtual library visits is 225,804, the Q4 figure is
45,903. With the exception of Lasswade and Newbattle Libraries, all libraries are open to their pre-COVID hours so in-person provision has increased and therefore virtual visits
have decreased from last year by 46,455 as an expected result.
Areas of improvement
An additional 9,101 calls were received via our Contact centre compared to 20/21. There has been an increase in calls for Self Isolation Grants and other support services
throughout the year as well as an increase in offline Social Work contact which has an impact on calls as staff are managing and responding to these contacts.  During the year the
contact centre and revenues teams facilitated the Scottish Welfare Fund. There remained a significant number of applications for Scottish Welfare Fund. During 2021/22 we
received 6,821 applications for Crisis grants of which 3,952 met the criteria and resulted in payments £452,000. Community Care grant applications totalled circa 1,300 of which
483 payments were made totalling £355,000. In addition there were 3,816 applications for Self Isolation Support grants of which 1,628 qualified with payments totalling £814,000.
This has led to a continued increase in claim and change of circumstances processing times as resource is focussed on these areas.
Page 39 of 96

Page 40

Online,
9.02%
Direct Debit,
45.27%
Payment
Card ,
18.96%
Automated
Telephone
Payment ,
4.34%
DWP Direct
Payment,
14.98%
Others,
7.43%
We pledge to optimise the ways in which the Council does digital, data and technology to work effectively, collaborate, make decisions, adapt and
innovate
We pledge to create better relationships between the Council and its communities by providing modern digital services that communities wants
to use
We pledge to maximize opportunities for digital, data and technology to enhance quality of life, the economy, sustainability and individual
opportunity in Midlothian
Digital by default
6 Data only indicators
Key highlights
• Continued progression of the new Digital Services Strategy ensuring the Council has the capacity and skills to take forward the associated investment and delivery of
plans.
• Equipped for Learning Programme (ELF) project was approved in 2021 and funding in place to support the delivery. This will provide every school age pupil in the county
with a learning device such as an iPad or Google Chromebook as part of Midlothian Council’s £10.5 million investment in digital learning. Significant progress made in
supporting Education ambition for 1 to 1 devices with phase 2 complete this year including improvements in Wi-Fi provision across schools to support wider
deployment of chromebooks and underlying technologies. In addition, new EFL web filtering solution was implemented to support 1 to 1 device deployment.
• Digital enabled projects: a number of business applications have been upgraded and these continue to improve customer and staff experience. Successful Application
upgrades including, major upgrade of Integra, CivicaPay including Mastercard 3DSecure V2, Civica 360, Open Revenues.
• The completion of the mobile phone replacement programme took place this quarter. 
• Cyber Security resilience: The cyber risk is currently high and a number of improvements have been made this year to the Councils cyber defences.  Following the geo-
politic risks of cyber spill over the Council has applied NCSC guidance on how to respond to the increased risk, by introducing additional controls. A number of staff
phishing exercises were carried out during this year which will continue. We achieved Public Services Network (PSN) Compliance in July 2021 and Cyber Security
Essentials was achieved In February 2022. In relation to Cyber Security awareness, a report was provided to CMT on cyber risk and actions taken and IT Security audit
rated overall satisfactory.
Areas of Improvement
The gap between requests received and resolved in the graphs below is principally as a consequence of the lead time for new devices, reflecting global demand and the
supply chain. Where necessary interim solutions are provided and the requests closed when a permanent resolution is secured.
Work will progress on the Digital Services priorities to continue to drive the Council’s vision to improve outcomes using digital and data through the Digital First board,
ensure the Council is well positioned to take advantage of emerging national initiatives and exploit technology in order to reduce costs and improve services.
Modern
Holistic
Hub and Spoke
One size fits one
3,538
13,777
3,325
12,752
Q4 21/22 21/22
Number of service incidents
Recieved Resolved
2,115
7,636
1,917
6,631
Q4 21/22 21/22
Number of service requests
Recieved Resolved
%of rent
transactions
(21/22)
Page 40 of 96

Page 41

8.55 9.69
7.26
9.33
18/19 19/20 20/21 21/22
Sickness Absence Days per
Employee - cumluative (All
employees) 5.15
5.77
3.47
4.61
18/19 19/20 20/21 21/22
Teacher Sickness absense days
9.86
11.19
8.76
11.22
18/19 19/20 20/21 21/22
Local Government employees
Sickness absence days
3.94% 3.06% 2.70% 2.52%
18/19 19/20 20/21 21/22
Gender pay gap between
average hourly rate of pay for
male and female (all employees)
Scottish Average for 20/21
Our Workforce
2 Targeted indicator, 13 data only indicators
No indicators off target
Key highlights
• This year we welcomed the Kickstart Scheme which is a new programme aimed at young people across our communities who are currently unemployed
facing long term unemployment. Young people from the Kickstart programme are already successfully transitioning into permanent roles. We have 24
placements in total. Cohort 1 have now successfully completed their six month placement with all going on to secure a positive destination within the
Council.
• Positive progress made on the creation of a one-Council approach to organisational wellbeing including the Making it Happen network launched in February
2022 for the Place directorate.
• We secured the Healthy Working Lives Award for 9th year running.
• Implementation of the Local Government Workers 2021 Pay Award and Preparation made to implement the teachers award, agreed in late March in April
2022 Salary Payments.
• Revised SNCT grievance procedure agreed and resolution procedure for Local Government Workers amended after consultation with Trade Unions.
• Transition plan from remote to hybrid working in place and on target for completion in Q1 22/23.
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to support the wellbeing of our staff. 
• Allocated one of the limited places on Age Scotland’s age inclusive matrix programme for 2022 which will see us work with senior consultants from Age
Scotland to review current practice, listen to workers of all ages, and maintain energy and focus to address and deliver changes to enhance the employee
experience.
Areas of improvement
Sickness absence days have increased compared to that of last year council wide. For Corporate Solutions, the average number of working days lost due to sickness
absence has increased from 5.84 in 20/21 to 7.85 this year. Of the FTE days lost, 67% was due to long term sickness, 16% self-certified, 17% short term absence.
While there is no identifiable trend causing the increase, either in short term or long term absences work continues with each service area to review attendance
levels and support those staff who are absent to be able to return to work.
We will continue to track our gender pay gaps and employee turnover rates. Turnover varies through the year .Consideration of the levels of turnover across
services, locations and particular groups of employees helps to inform workforce planning and resourcing. Aside from 20/21 where staff turnover was 5.9% the
turnover rate has been consistent the last 3 years between 9-10.5%. 
Our people deliver high performing services
We build an entrepreneurial council for future
We demonstrate strong and consistent leadership
We Promote Equality, diversity and fairness
Holistic
Sustainable
Hub and Spoke
Preventative
Page 41 of 96

Page 42

108% 99% 108%
19/20 20/21 21/22
In year recovery of
overpayments - % of all
Housing benefit
overpayments indentified
Target (80%)
17%
12% 14%
19/20 20/21 21/22
All recovery overpayments -as
a % of all HB overpayment
debt
Target 20%
93%
95% 95% 95% 95%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
% of invoices sampled and paid
within 30 days - Corporate
Solutions
Target (95%)
76.61%
77.23%
76.88%
76.58%
18/19 19/20 20/21 21/22
% of Direct Debit payers for
Council Tax
Target (77%)
Finance
6 Targeted indicator, 3 data only indicators
2 off target
Key highlights
• Completion of the 2020/21 financial statements and audit. Maintaining a green rating for Financial Management from EY the Council’s appointed external
auditor.
• Completion of 2022/23 base budget and supporting the work of BTSG to consider options to secure a balanced budget.
• Presentation to Council in February of a full suite of financial monitoring reports for last quarter which included an assessment of the financial impact of COVID
and an update on Council reserves linking into budget decisions for 22/23. 
• Throughout the year the finance team have carried out in depth financial input to key projects embedded in the Medium Term Financial Strategy including
Destination Hillend, Early Years Expansion, and demographic pressures in service areas and the Learning Estate Strategy and in addition carried out detailed
analysis on the impact of the Local Government Finance settlement following the Scottish Budget announced in December
• Invoice payment performance for Corporate Solutions has remained on target this year, 95% of invoices paid within 30 days.
• Throughout the year Business applications have supported various grant funds and payment schemes supporting businesses and the people of Midlothian
including the introduction of the child disability payments scheme, low income pandemic payments, discretionary grant fund, taxi fund and ventilation fund,
housing payments for tenant grant fund, education early years omicron impact fund, CLL grant payment YPG training allowances,  milk and healthy snack scheme
and in addition the launch of local support of free bus travel for under 21s.
• £808,000 was awarded from the Scottish Welfare Fund this year. The increase from last year reflects the greater uptake of grants at this stage in the pandemic
with the 2020/21 values being suppressed by periods of lockdown.
Areas for improvement
2021/22 continued to be dominated by the impact of the pandemic on our communities and on the Council itself.  Furthermore financial sustainability continued to
dominate the agenda. In their Annual Audit Report for the financial year ended 31 March 2021 EY, The Council’s appointed External Auditor, rated Financial Sustainability
as amber. Subsequent to Council consideration of that report the settlement for Local Government for 2022/23 was announced in December 2021 and represented a
cash reduction in core grant nationally of circa £100m at a time where costs continue to rise. On 27th January 2022 a further £120 million one off funding was announced
for Local Government. However Councils continue to face a £251m real terms cut which will increase again in 2023/24 by a further £120m if the one-off funding for
2022/23 is not baselined within the Local Government settlement. While Council subsequently agreed a balanced budget and a Band D Council Tax of £1,442.60 balancing
the budget was reliant of £12 million of one off funding. Accordingly the recurring expenditure of £251 million for 2022/23 exceeds recurring funding by that £12 million. 
Projections are that 2023/24 and beyond will require significant service reductions, focusing on statutory requirements as well as continued service transformation. 
Sustainable
Holistic
Modern
The revised grant settlement for 2022/23 means a further real terms reduction in core funding. The reliance on one off funding sources to
balance the 2022/23 budget combined with the challenging outlook for local government funding adversely impacts on the Council ‘s
financial sustainability and will result in the need to cut services in 2023/24 and beyond.
The Council has robust and effective financial management arrangements
Preventative
Page 42 of 96

Page 43

18.07% 15.44% 14.68% 16.81%
17/18 18/19 19/20 20/21
% of procurement spent on
local enterprises (LGBF)
Scottish average
Procurement
No service indicators – 1 LGBF
Key highlights
• Work continues on the development of the SME/Procurement strategy. The team have reviewed and streamlined the non-competitive action
process, the request for procurement process and developed a non-regulated procurement process and new contract database.
• The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing (amongst others) which not only provides
an easier route to market but also delivers value for money.
• A range of high value/complex contracts were awarded this year including Carer Support Services, and Care at Home recommissioning tender and
School Counselling Services tender.
• Other key activities included the roll out of the benefits system to assist the Council in obtaining community benefits from contracts, roll out of
contract variations for all National Care Home Providers contract and roll out of contract variations for all Health & Social Care providers regarding
the Living Wage uplift.
• As part of the Local government benchmarking exercise, the percentage of procurement spend on local enterprises for 20/21 has increased from
that of 18/19 and 19/20.
Areas of improvement
Work will continue to progress on the Procurement priorities: Review and reshape the procurement service, implement learning from the Scotland excel
review and in partnership with Economic Development and stakeholders continue to ensure business community benefits in the supply chain to maximise
opportunities for local people.
Holistic
Sustainable
Hub and Spoke
Best Value is evidenced Council Wide in the procurement of goods and services
Effective contract and supplier management across the whole of the procurement journey 
One size fits one
Page 43 of 96

Page 44

Page 44 of 96

Page 45

1
Education Annual Performance Report 2021/22 
01. Progress in delivery of strategic outcomes
Midlothian Single Plan Priority Reducing the gap in learning outcomes  
Priority 1: Attainment and Achievement  
1.1 Improve attainment within the Broad General Education (BGE) stages:  
The Scottish Government (SG) published the National Improvement Framework (NIF) Report 2021 and
Improvement Plan 2022 December 2021. The SG NIF report highlighted the impact of the pandemic on attainment
within the BGE with the attainment gap widening between the most and least disadvantaged children. 
At P1, performance in listening & talking, reading, writing and numeracy were all above the national figures. 
Performance in listening and talking at P4 and P7 is in line with the national picture. 
At P7, fewer children attained the expected CfE level in numeracy and this has been a key focus for schools in terms
of closing the learning gap caused by the pandemic. Overall, the Midlothian CfE data mirrors the national picture and
a Building Back Better Recovery Programme was initiated within identified schools and/or stages. 
The Building Back Better team matched expertise to need, and targeted schools with the largest gaps taking into
account a number of factors; attainment in 2021 v 2019, attainment predicted in 2022, impact of the poverty related
attainment gap, gender differences and ASN need. The team also identified support needed for P2 and P5 in order
to support learners who had narrowly missed their expected level in June 2021. Throughout Jan – March 2022 the
team targeted schools with children “at risk” of not achieving expected level by June in P1, P4 and P7. 
The Programme has had a significant impact on raising children’s attainment with on average a 5.4% increase in
attainment within the target schools and stages. Predicted data suggests we will report an increase in the
percentage of children achieving both literacy and numeracy at P1, P4 and P7 June 2022. 
As CfE data was not collected for S3 in June 2021, further analysis of S3 data June 2022 will be carried out and
reported Q2 2022/23. 
1.2 Improve attainment within the senior phase by maximising opportunities through curriculum planning,
consortium arrangements and partnership delivery, including addressing the ASN Senior Phase Gap  
National Benchmarking Measures  
Number of Leavers June 2021: 877. This was 100 higher than in 2020. 
% Leavers Achieving Level 4 or better Literacy and Numeracy 21: 89.85%. This was in line with our virtual
comparator. 
% Leavers Achieving Level 5 or better Literacy and Numeracy 21: 66.36%. This was a 1.24% increase on 2020 and
2.15% above our virtual comparator at this level. 
Initial leaver destinations  
95.44% of leavers entered a positive initial destination. This is in line with our virtual comparator and was,
percentage point-wise, above the VC and SEIC. Despite the challenges of the pandemic, more young people
entered a positive destination in 2021 than in 2020. 
Improving Attainment for All  
Performance in our lowest 20% and middle 60% is in line with our virtual comparator, with performance of the
highest 20% greater than our virtual comparator. 
Attainment versus Deprivation 
Across all deciles, all leavers performance was in line with that of their peers within the virtual comparator. However,
against the national, SIMD decile 8 was much lower. Decile 2,4 and 5 was lower. 
Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.5
Page 45 of 96

Page 46

2  
Breadth and Depth: Leavers  
5 or more at level 4: 82.78%, virtual comparator: 83.66% 
5 or more at level 5: 63.17%, virtual comparator: 64.71% 
1 or more at level 6: 59.98%, virtual comparator: 63.04% 
3 or more at level 6: 47.66%, virtual comparator: 49.75% 
5 or more at level 6: 33.98%, virtual comparator: 36.33% 
1 or more at level 7: 25.09%, virtual comparator: 23.53% 
Leavers: Pupils with Additional Support Needs  
Attainment in Literacy & Numeracy: 
% Leavers Achieving Level 4 or better Literacy and Numeracy 21: 81.9%. Our virtual comparator was 78.44% 
% Leavers Achieving Level 5 or better Literacy and Numeracy 21: 45.40%. Our virtual comparator was 43.83% 
The percentage of school leavers with additional support needs entering a positive initial destination was 92.94%.
This to our virtual comparator of 92.45% and the SEIC was 92.09% and national 92.81%. 
1.3 Reduce the attainment gap between the most and least deprived children, including care-experienced
children. 
As mentioned above the gap between the most and least deprived children has widened during the pandemic period
at a national level and this picture is also evident within Midlothian. 
The gap between the most and least deprived in literacy at P1,P4 and P7 was 32 percentage points and 23
percentage points in numeracy June 2021. The Building Back Better intervention programme has targeted schools
where data highlighted the need for further intervention. 
Midlothian Single Plan Priority Reducing the gap in health outcomes  
Priority 2: Included, Involved and Engaged: Wellbeing & Equity  
2.1 Improve Equity and Inclusion  
School attendance rate was 92.3% for 2020-21. Attendance data was not gathered in 2019-20. 
Attendance is being monitored and tracked to identify children and young people at risk of disengaging from
education. This has been more evident within the secondary sector than primary. 
Initial aims of the nurture strategy have focused on building capacity in schools through awareness and skills in
nurturing approaches. The strategy group will now review attendance, behaviour and wellbeing data to inform
outcomes for the 3rd year of the nurture strategy and evaluate impact at universal level and across specific groups
of children and young people. 
Key achievements to date:
- Built a commitment to nurture, strategic plan and network of partnerships: The Nurture Strategy group meets every
2 months to review direction and activities. There are currently 73 Nurture Leads in Midlothian schools, Early Years
centres, Community and Life-long Learning, and Children and Families teams forming 8 Collaborative Peer Support
Network Groups. Links have been made with third sector organisations so that a consortium group has been formed. 
- Training and resources: A digital platform has been set up to support school and practice development with
nurture-related resources including a Nurture reflection tool and summary documents. Authority-wide training on
Nurture: Attachment Aware and Applying the Six Nurture Principles in Practice has been delivered across schools
and authority wide staff. More bespoke training and consultations are delivered by the Educational Psychology team. 
2.2 Develop and improve health and wellbeing of staff and all children and young people from early level  
Various surveys have been carried out to assess the health and wellbeing needs of staff and children and young
people. Staff focus groups will be held June 2022 to seek views on what further support the authority can provide to
improve staff health and wellbeing. A Health & Wellbeing consultation session was held with an external specialist
consultant to support our head teachers through the challenges faced as a result of the pandemic. A cultural audit
was also carried out with staff from the specialist sector and staff from occupational health are now supporting the
Page 46 of 96

Page 47

3
authority to address the identified next steps. Health and Wellbeing surveys at school level have identified the needs
of individual and groups of children and young people. In addition, Education and Children's Services are working
closely with NHS Lothian staff to introduce a new service to improve access to mental health support at an earlier
stage. 
Midlothian School Counselling Service
As at January 2022 the counselling service had been delivering support to Midlothian school pupils aged 10-18 for a
little over a year, including an initial one year pilot period in which the service specification was developed. 
The next round of monitoring data is due at the end of this month, but between November 2020 and December 2021
184 young people had accessed the service for individual counselling sessions with still more accessing information
and support via the 135 drop-in sessions hosted across 5 of the High Schools. The primary reasons for referral into
counselling were anxiety, low mood and difficulties managing relationships. The engagement rate has been very
high at 91.3% over the lifetime of the service so very few young people are dropping out with most attending at least
7 sessions. 88% felt some reduction in their distress after completing their counselling, with 40% showing a clinically
significant improvement. 98% showed improvements in engaging with family, friends, and in social activities despite
the ever present and changing pandemic restrictions. 
Community Mental Health Framework – Supports and Services 
Since November 2020 the Council has allocated three tranches of funding received from the Scottish Government
and aimed at improving mental health and wellbeing outcomes for children, young people aged 5-24, and their
families and carers. Governance of the funds sits with the relatively newly established Midlothian Children and
Young People’s Mental Health Strategic Planning Group, and money was distributed following a competitive
application process. 
In all 10 local organisations have received funding to deliver a range of supports and services including: 
. a programme of personalised developmental placements completed by 43 of the hardest to reach young people 
. art therapy, play therapy, family counselling and carer support delivered to 134 children and 85 family
members/carers 
. a Forest & Outdoor Learning Award programme and a green learning voluntary programme completed by 42 young
people 
. individual, group and workshop based anxiety management interventions attended by c72 children, 326 parents
and carers, and 67 school staff members 
. packages of personalised practical and emotional support delivered to 40 families. 
Delivery, using existing funding, will continue to March 2023 enabling more local young people and their
families/carers to benefit from this range of interventions. Feedback from beneficiaries to date has been
overwhelmingly positive and all who have received support have reported improved outcomes. 
Priority 3: Self-improving Systems  
3.1 Develop a quality improvement framework to support schools to achieve Good or better in inspection
QIs through: Empowerment of leaders at all levels, leading to an empowered system Improving quality of
leadership at all levels.  
A draft Parental Engagement Strategy is out to consultation with staff, pupils and parents has been created and is
being shared with EEG, ASGs and Parent Councils for Consultation. 
In the final term of this academic session, the local authority is carrying out the Scottish Government Parental
Engagement and Involvement Survey to provide a baseline of our strengths and aspects for improvement. 
Our Head Teachers and staff have been involved in the creation of our authority-wide Quality Improvement
Framework which will be implemented from August 2022, setting out clear expectations and standards across all of
our schools. 
The EYs Principal teachers have carried out 124 visits across 64 settings since August as part of the quality
improvement support. They have also worked with improvements settings for targeted support alongside the Care 
Inspector Improvement service. The number of improvement settings has reduced by 43% since August 2021. 
Midlothian Single Plan Priority Reducing the gap in economic circumstances  
Priority 4: Life-Long Learning and Career-Ready Employability
Page 47 of 96

Page 48

4  
4.1 Improve senior phase progression pathways to improve positive destinations, including for young
people with ASN and who are care experienced.  
See above re positive destination figures for all leavers and pupils with additional support needs. 
Priority 5: Finance & Resources  
5.1 Deliver Best Value through:  
- Reviewing and implementing the learning estate strategy, taking cognisance of the ASN learning estate
- Robust workforce planning
- DSM review  
Learning Estate  
School roll projections have been updated and a revised learning estate strategy is being finalised. Designs for
Easthouses Primary School and Mayfield Campus are being finalised taking account of feedback from key
stakeholders including the community. The Beeslack High School replacement site is due to be announced before
the end of this academic session. 
The new Burnbrae Early and ASN Provision has received positive feedback from Education Scotland and HMI on
the quality of the learning environment. 
Following consultation, the council approved the closure of St Margarets RC Primary School, which is now being
utilised as provision for young people with additional support needs. 
DSM Review 
THE DSM scheme was reviewed in line with national guidance and in consultation with head teachers. A further
review is to take place 2022-23 with a focus on ASN and Early Years. 
5.2 Equipped for learning:
Identified delivery milestones for the first phase of the Equipped for Learning programme have been delivered on
time and within budget during 2021-22. The project is now on track for Phase 2 delivery, focusing on transformation
of learning and teaching pedagogy and further infrastructure improvement. 
In Q4, this has included the provision of a digital device for learning for all primary-aged pupils, following the
successful rollout of devices to secondary school pupils in Q3. 
Digital devices to support learning have been provided to every secondary school pupil as part of the Equipped for
Learning programme. These devices are being used daily in classrooms and at home. Specific pedagogical
approaches, linked to the use of digital technology in the classroom are being trialled within the Newbattle Digital
Centre of Excellence, as part of a practitioner-enquiry approach. 
02. Challenges and Risks
21/22: 
- Outcome of the Education Reform Consultation and National Care Service Consultation 
- Uncertainty about how SQA qualifications will be assessed academic session 2021/22 and beyond. 
- Impact of the pandemic on post-school destinations 
- Midlothian Council has a relatively high proportion of funded ELC places delivered by partners in the private and
voluntary sectors. As such, any increases in the rate that is paid to funded providers would create additional upward
pressure on the early years budget for 2022/23. 
- Rate of demographic growth on the learning estate 
Page 48 of 96

Page 49

5
- A full refresh of school roll projections and capacities has been undertaken to assess current and future demand.
This work will inform and shape the Learning Estate Strategy over the next 5 years. 
- A number of schools funded through the Scottish Governments Learning Estate Investment Programme are at the
briefing and design stages. There are council and developer funded projects being undertaken also. 
- The Roll Projection data will be checked and refreshed on a 6 month basis to ensure we have provided sufficient
capacity in each catchment. 
- A programme of Suitability Surveys will be conducted in 2022 to ensure our Core Facts data is reflective of the
current situation. 
- The Place Directorate are conducting Condition Surveys in all schools assets. - Increase in the number of children
and young people with additional support requiring more specialist provision will require robust monitoring to ensure
staffing and specialist facilities meets level of needs   
Page 49 of 96

Page 50

6  Page 50 of 96

Page 51

Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.6 
Place Annual Performance Report 2021-22 
The Place Principle
Place is where people, location and resources combine to create a sense of identity and purpose. The
Place service ambition is to deliver joined-up, collaborative, and participative approaches to services,
land and buildings, across all sectors within a place, enabling better outcomes for everyone and
increased opportunities for people and communities to shape their own lives. 
We have endorsed the place principle because we are committed to strengthening the co-ordination and
integration of all place based activity. The principle is a way of bringing together ideas about services,
investments, resources and assets to achieve a shared vision. We are creating a shared understanding of
what a place is for and what it wants to become with partners and communities collaboratively agreeing
the joint actions required to make that happen and delivering these. This approach provides our key
stakeholders with a way to exercise local or regional accountability over decisions taken about the way
resources, services and assets are directed and delivered. 
In implementing the place principle we: 
• consider the benefits of planning, investment and implementation activity at the regional level of
place - where that focus could drive faster rates of sustainable and inclusive economic growth
• ensure that place based work at the local level being led by Midlothian Council and its
agencies/partnerships is taken forward in a way that is integrated and complementary of all the
work being taken forward in associated policy areas and plans
• exemplify the behaviours reflecting the core of the principle, working and planning together with
our partners and local communities to improve the lives of people, support inclusive growth and
create more successful places.
Over the past year, innovative ways of working have been introduced and services adapted at pace to
respond to the needs of our citizens at pace, in particular those experiencing the greatest levels of
poverty and inequality. This has resulted in a complete transformation of how the Council works. Place
services are continuing to build on this learning moving forward, harnessing the energy, flexibility and
creativity demonstrated by our workforce, to embed a culture of continuous improvement and
innovation across Place. 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a Locality approach to service delivery
adopted, developed in conjunction with community planning partners. The opportunity to review and
redesign services that the pandemic has provided will result in a more efficient and effective operation of
sites within local communities. This will improve service delivery, and ensure better outcomes for local
communities. The continued rollout of enhanced ICT capabilities will strengthen cross service working,
produce resource efficiencies and support the localisation of services. 
Page 51 of 96

Page 52

Successes this year 
Environmental 
Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change Declaration,
publicly acknowledging the challenges and opportunities that climate change brings with a commitment to
make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate
Change Strategy and focus continues within the Place services to achieve future emissions targets.  The
ambitious strategy sets out how we will reduce our greenhouse gas emissions, encourage and work with
others in our community to mitigate and adapt to changing climate. The strategy incorporates an action
plan with a number of initiatives and ongoing programmes which together are helping to reduce our
emissions and carbon footprint. This year 702 new lighting columns were replaced with LED lanterns and
an upgrade of 350 sodium lighting units contributing to energy and carbon savings. 
Good progress was made in 2021/22 with the annual Capital Works Programme for carriageway
resurfacing, despite the ongoing impact of COVID-19.8 carriageway resurfacing schemes were undertaken,
utilising entirely framework contractors.  9.9km of carriageway has been resurfaced for the year (1.4% of
the total road network) under the Capital Works Programme, and an additional 4.14km resurfaced during
Q3 and Q4 as part of the Residential Streets programme, totalling 14.04km of carriageway resurfaced this
year (2.05% of the total road network). 
The Residential Streets programme commenced at the start of October, with the first phase of carriageway
and footway resurfacing completed during Q3 by our in-house resource. Residential Streets is a two year
programme to improve the condition of footways and roads across the county, and an example of a
coordinated Neighbourhood Services works programme. Whilst the resurfacing works are taking place,
Land and Countryside are attending to verges and overgrown foliage, whilst dropped kerbs requests are
also being carried out and street lighting assessments taking place in each location.  
The successful delivery of winter service includes responding to a number of storms this year. Land
Services/Kickstart staff have been working with roads staff  to ensure winter readiness. The winter service
manual was revised in partnership with cross-Council service areas and communities. Road Services
worked with Property and Facilities Management Services to carry out a review and condition survey of all
grit bins, as well as responding to individual community requests. The survey results have been
consolidated using the   Geographic Information System mapping system for assets to show locations and
facilitate requests in real time, and this is now available to view via the Council’s website,
In-cab units to enable Waste Services to move to a Digital Depot way of working have been received
following a successful funding bid to the Scottish Government’s Recycling Improvement Fund. The
intention is that these units will integrate with the new Customer Service Platform allowing service
requests to be closed in real time.  
Following discussions on reuse, plans are developing on a reuse service at Stobhill. The partnership
opportunity was advertised for partners to take items from Stobhill Recycling Centre for refurbishment or
reuse.  A preferred contractor has been identified to collect household waste for reuse from Stobhill
Recycling Centre. Setting up the reuse cabin will be progressed in Q1 2022/23. 
Landscaping project works: completion of 5 playground and Auld Gala Park with various tenders underway
including Waterfall Park, Kings Park, Easthouses Park and a pump track at North Middletown to continue
into 22/23. The Ranger Service continues to engage with communities and volunteers on various
initiatives. All 7 sites have been inspected this year and tree works for all sites complete. A Green Flag
award was received for the Penicuik to Dalkeith walkway. Unfortunately volunteering has been restricted
by COVID-19 over the last year and although off target, groups and event numbers are now increasing. The
Page 52 of 96

Page 53

annual target of 9,000 reflects pre-pandemic figures and during 21/22, 4,821 hours were used in the
countryside, which we expect to increase next year. 
Economic 
Midlothian Council’s Economic Renewal Strategy sets out its ambitious approach to managing the
transition from lockdown and planning for the longer term challenges the local economy will face, the
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims
are to protect jobs and aid business recovery using a place based partnership approach that maximises
the opportunities developing from the pandemic. Taking this partnership approach, the strategy will
foster entrepreneurship, upskilling and training, addressing gaps in the market and changing the way
business is done to better align this to customer behaviour. Alongside support for agriculture, tourism and
the leisure and hospitality sectors, the council will also promote local jobs and self-employment
opportunities, particularly for young people, to give them the necessary skills and support they need to
benefit from economic recovery. 
The Locate in Midlothian website continues to be a valuable tool for employability opportunities and
employment support. Each social channel is targeting different audiences and each is performing well in
terms of audience growth and interaction. 
This year we have continued to maximise opportunities to support recovery of the tourism sector by
supporting the development of the tourism forum’s digital presence and representation on the steering
group. A member benefit has been included of a quarterly roundtable meeting with Economic
Development and Business Gateway to raise challenges and opportunities - early intervention in new
initiatives can help accelerate those that will encourage more visitors to Midlothian. Business Gateway has
referred 40 businesses to Midlothian Tourist Forum and membership is now at 55.
Local Procurement: We have a dedicated officer in the Economic Development Service and although
progress has stalled over the COVID-19 period due to capacity, we are in a good position to now take this
forward with momentum as businesses are more comfortable directing resource at future opportunities.
Addressing a gap in the learning cycle, we are introducing a procurement mentor to the client journey
providing 121 support; this should increase the volume and quality of local bids. 
Tyne Esk LEADER Scottish Rural Parliament project is now complete with a Midlothian/East Lothian needs
based funding strategy produced. This will to inform the way forward. Close links with communities were
fostered and communities are welcoming to further engagement with the Scottish Rural
Parliament.  Opportunities that may arise are working with the Scottish Rural Youth Task Force/Scottish
and Rural Islands Youth Parliament for young people, with Tyne Esk as potential first hosts, and Scotland’s
Older People Assembly for older people. 
This year the Economic Development team, with other departmental support completed the allocation of
the discretionary fund. The fund provided small business support with on-off grant payments who were
impacted by COVID. 
Regeneration
The Planning Service has recovered approximately £11.8m and secured £12.9m in developer contributions
in 21/22 towards: new schools; community facilities; sport, leisure and play provision; transport
infrastructure; and town centre improvement projects. 
Page 53 of 96

Page 54

The Planning Committee this year have granted various permissions for significant strategic planning
applications leading to new tourist facilities, investment and job creation 
Town centre Capital fund, of the seven applications approved (£910,000) all projects are now complete
with Penicuik Town Hall completing this quarter. Further public realm works have also recently received
funding through the Place Based Investment Fund. 
Housing and homelessness 
Midlothian Council’s Strategic Housing Investment Programme (SHIP) was submitted to the Scottish
Government in November 2021. To address the need for affordable housing, the SHIP details potential
sites for 2,446 new affordable homes to be built between 2022/2022 and 2026/27. 
There were 4,237 active housing applicants placed on the Common Housing Register at the end of this
reporting period.
431 permanent homes have been provided to housing list applicants via the common housing register
since 1 April 2021. An increase in 104 lets (32%) in permanent homes compared to last year.      
During this reporting period, 99 households were assessed as homeless, with 385 households assessed
since 1 April 2021. It is a positive decrease of 22% in the overall number of homeless households assessed
compared to 493 households assessed during 2020/21. Since 1st April 2021, 790 households have been
provided with advice and assistance compared to 515 for 2020/21. During 2021/2022 48 temporary
properties have been successfully converted to permanent tenancies. The service has also progressed the
delivery of 22 Housing First cases.     
Midlothian Council’s Rapid Rehousing Transition Plan (RRTP) was submitted to the Scottish Government on
30th June 2021. This sets out a vision that by 2024: an increased number of homeless households will
obtain permanent accommodation, no homeless household will be accommodated in bed and breakfast
accommodation, and the average time taken for the Council to complete its homeless duty will have
halved from 105 to 52 weeks. As of quarter 4 the length of time homeless applicants waiting until receiving
a permanent housing is 85 weeks which has steadily improved throughout the year, with a reduction of 42
weeks in comparison to Q1. 
95% of new tenants were very satisfied with their new council home and experience with the Housing and
Wellbeing Service.  100% of new tenancies were sustained after 12 months. 
The Equally Safe Housing and Homelessness Policy was approved this year and is currently being
implemented. It has been developed with Midlothian Women’s Aid and Mid and East Lothian’s Public
Protection Team taking into account the specific needs of those experiencing domestic abuse and
upcoming legislative changes. 
To comply with the Scottish Housing Regulator’s Regulatory Framework, the Council approved the Annual
Assurance Statement providing full assurance that it is meeting legislative and regulatory standards.
Capital programme 
As Scotland’s fastest growing local authority area, it is critical to delivery that investment in community
infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
Page 54 of 96

Page 55

How we invest in community infrastructure must also respond to changes in our working and living
patterns brought about by the COVID-19 pandemic. Communities need to be able to readily access the
services they need. Capital investment is also an opportunity to support our local economy through job
creation and skills enhancement, particularly in relation to supporting a transition to a green economy as
we invest in sustainable, highly energy efficient buildings. 
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how
we live now. We will invest in community infrastructure with a focus on place-making, reducing
inequalities, improving economic opportunities and improving education and health and wellbeing
outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our
past successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of
Midlothian and its citizens. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so
has to reflect the demands of Council services to ensure positive outcomes are achieved in the right place,
at the right time for the maximum benefit to Midlothian.  The extensive capital programme, totalling
£0.8bn, delivers new schools, a record investment in council housing, improved community infrastructure,
investment in the local transport network and in innovative developments such as the new low carbon
heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship
opportunities, opportunities for businesses and communities and families hard-hit by the impact of COVID-
19. These new opportunities help lead the way out of the pandemic and towards a better future for
Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular
review meetings with Education and stakeholders to ensure effective monitoring, reporting and
delivery of improvement and expansion of the Education estate including early years provision. This
currently covers approximately 30 projects at various stages of development. 
In relation to our ambitious affordable housing programme, in total there were 334 site starts in the
year, with 180 homes completed. In total, Midlothian Council attracted over £15m of Scottish
Government grant funding into its affordable housing programme in 2021/22. 
Midlothian Council is overseeing a significant housing programme. This includes the largest Passivhaus
programme in Scotland, with 182 homes to be built to the exacting Passivhaus standard, in line with
Midlothian Council’s Net Zero Housing Design Guide. This ensures exceptionally high levels of energy
efficiency and low utility bills for our residents. The conversion of Jarnac Court in Dalkeith is also now
complete and will soon be providing temporary housing accommodation for those most in need. 
Works are now underway at Polton Street in Bonnyrigg, where Midlothian Council is working closely with
the Midlothian Health and Social Care Partnership to build 46 homes with onsite care, as well as an
Intermediate Care Facility providing interim and respite care for up to 40 short term residents and a new
Day Services facility to support older people in the refurbished former Bonnyrigg Infant School. All of the
new build elements of this development will be built to Passivhaus standard. 
Destination Hillend continues to move forward. The first package of works, relating to the upgrade of the
junction at the entrance are now out to tender and relevant planning applications are progressing. Design
Page 55 of 96

Page 56

development continues on the most exciting elements of this development: the alpine coaster, the zipline
and the new snowsports centre. 
A public consultation exercise was completed for the A701 Relief Road and that project is also progressing,
with the imminent selection of a preferred route and publication of the Stage 2 Scottish Transport
Appraisal Guidance report. 
Utilising the Place Based Investment Fund, we have also invested in further public realm upgrades in
Penicuik Town Centre, a new mobile library bus and a pop-up park in Newtongrange Town Centre. 
Challenges 
The challenges for Midlothian continue with our recovery out of the pandemic, the growing and ageing
population and the increasing demand for services that this brings. Midlothian is projected to have the
highest percentage change in population size of all council areas in Scotland. From 2018 to 2028, the
population of Midlothian is projected to increase from 91,340 to 103,945. This is an increase of 13.8%,
which is in contrast to a projected increase of 1.8% for Scotland as a whole with a 40.9% increase in older
people over 75.  In addition, Midlothian has 10 zones which fall into the most deprived areas giving a local
share of 8.7% living in the most deprived areas in Scotland.  This pace of growth demands additional
capacity within the school estate to cope with the projected increase in pupil numbers. The general
population growth forecast places additional pressure on our infrastructure, including the growth of the
road network as new development roads are adopted, and increases the demand on essential services
such as waste collection. 
As part of work to address the issue of significant population growth and demographic changes within
Midlothian, the key drivers of change in delivery of sustainable and transformational services and
regeneration of our communities must be viewed holistically. We have endorsed the Place Principle
because we are committed to strengthening the co-ordination and integration of all place based activity.
This means we will: 
• consider the benefits of planning, investment and implementation activity at the regional level of
place - where that focus could drive faster rates of sustainable and inclusive economic growth
• ensure that place based work at the local level being led by Midlothian Council and its
agencies/partnerships is taken forward in a way that is integrated and complementary of all the
work being taken forward in associated policy areas and plans
• exemplify the behaviours reflecting the core of the principle, working and planning together with
our partners and local communities to improve the lives of people, support inclusive growth and
create more successful places. 
Service Performance 
The COVID pandemic continues to have a direct impact on Place services during the quarter and this
is reflected in some of the service performance indicators set later in this report.   
An average of 67.5% of public health requests were responded to this year, a reduction compared to 74.4%
responded to last year.  This is a result of the Environmental Health team being diverted to proactively deal
with the COVID-19 pandemic. 
Intelligence logging although off target remains strong and one of the highest in Scotland for our authority
size. Figures are dependent on justifiable intelligence.
Page 56 of 96

Page 57

Due to Covid 19 enhanced cleaning and janitorial services has continued to take place this year in all
schools, resulting in continued increased weekly hours:  
Primary schools – Budgeted weekly hours are 2105, currently 2825 hours used per week due to
Covid measures.
Secondary schools – Budgeted weekly hours are 1392, currently 1632 hours used per week due to
Covid measures. 
Janitorial services – Budgeted weekly hours are 1140, currently 4130.5 hours used per week due to
Covid measures 
There continues to be a significant demand placed on homeless and temporary accommodation services. A
potential key challenge will be an increase in homelessness as the financial measures put in place to
protect households during the Covid pandemic are now withdrawn, alongside the recent increase in
energy, food and fuel costs, requiring a comprehensive preventative approach as set out in the Council’s
Rapid Rehousing Transition Plan 2021/22. 
Re-let time for permanent properties has reduced to 39 days this quarter and temporary re-lets has
increased to 41 days. This has been due to properties requiring extensive works, delays with utility
connections and some delays with furnishing contractors. 
Average time to complete non-emergency repairs has remained off target (7 days) throughout this year.
The yearly average taken across all quarters is 15.27 days to complete non-emergency repairs. Whilst this
indicator is not on target there has been improvement over this year in completion times from 17.95 days
in Q1 to 14.49 days in Q4. Suppliers are reporting production levels are improving to pre-COVID output but
there are issues with delivery of materials and workforce challenges with contractors unable to meet
demand.  
Due to changes in the Energy Efficiency regulations affecting the Scottish Housing Quality Standards (SHQS)
criteria, 431 houses were identified during Q3 as failing Energy Efficiency Standards for Scottish Housing.
We have reduced these failures from 431 to 160 to meet the 2025 targets. However, with the Electrical
Installation Condition Reports (EICR’s) now part of the SHQS from the 31st March 2022 we have found that
4733 fail assessment and therefore we have 34.3% meeting standard due to this. It should be noted that
100% of smoke alarm devices comply with current legislation. 
Progress with annual Capital Works Programme for footway resurfacing due to this focus on carriageway
works is off target for the year. 3.82km of footway was resurfaced to end of Q4. Our annual target was
increased from 0.56% to 0.76% in Q3 to include the Residential Streets Programme work which will
continue into Q1. 
Domestic residual waste collection tonnages remains high this year and recycling rates lower. Working
from home and lockdown periods has resulted in higher waste volumes.   
Number of Business starts ups remain low after impact from Covid, however the total number of start-ups
for the year to date 2021/2022 represents an increase of 65% for the same period in 2020/2021. Initiatives
are in place to promote and encourage businesses where possible in the current climate. 
Mitigating the Scottish Government’s decision to reject the Strategic Development Plan (SESplan2) for the
South East of Scotland which leaves Midlothian and the other Council’s in the region without an up to date
strategic development plan.
Page 57 of 96

Page 58

Page 58 of 96

Page 59

Appendix 1
Page 59 of 96

Page 60

88%
50% 60%
100% 100%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
% of building warrant
assessments processed within
10 days rather than nationally
adopted target of 20 days
Target (80%)
2,148
1,843 1,859
1,149 1,216
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of complaints
received
1295
1256
20/21 21/22
Total savings in street lighting
carbon emissions (Tonnes)
(cumulative)
£610,056
£1,142,321
£1,998,833
1,067,383
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Achieve 5% reduction of
target in transport costs
Quarterly Max Target (£1,251,213)
12.00% 11.10% 12.60% 12.40% 13.80%
Q3
20/21
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
% of waste  going to landfill
per quarter
Max Tolerance (35%)
100% 100% 100% 100%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Proportion of fly tipping
incidents removed within 5
working days
1 1
20/21 21/22
Number of environmental
awards e.g. Green flags
19
34
27
18
23
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of out of control  dog
investigations  conducted
94,488
53,445
98,390
173,042
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of Free school meals
provided (Primary 1-3)
(quarterly)
6 6 6 6
18/19 19/20 20/21 21/22
Number of parks for which
quality plans have been
implemented (cumulative)
37 38 36
44 42
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of intelligence logs
made (quarterly)
12
15.27
20/21 21/22
Average days to complete
non-emergency repairs
Target (7 days)
Trend Data
A full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
Place Q4 21/22 performance report
Page 60 of 96

Page 61

100% 99.30% 99.30% 93% 96%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Satisfaction % relating to key areas
in Building standards including
those on delivery, timeliness,
information, access and the quality
of customer service
Target (90%)
100% 98.40% 98.40% 98.40%
18/19 19/20 20/21 21/22
% of the Councils housing stock
meeting the 'Modern facilities &
services' Scottish Housing Quality
Standard criteria
Target (100%)
100% 98.90% 98.90% 98.90%
18/19 19/20 20/21 21/22
% of the Council's housing stock
meeting the 'Free from serious
disrepair' Scottish Housing Quality
Standard criteria
Target (100%)
Holistic
Modern
Sustainable
Preventative
Key highlights
This year Building Standards was awarded with a CSE (Customer Service Excellence award). The service were re‐awarded the 31 compliance pluses gained over previous years, and
gained an extra 3 compliance pluses.
Capital programme: In relation to our ambitious affordable housing programme, in total there were 334 site starts in the year, with 180 homes completed. In total,
Midlothian Council attracted over £15m of Scottish Government grant funding into its affordable housing programme in 2021/22. This includes the largest Passivhaus
programme in Scotland, with 182 homes to be built to the exacting Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures
exceptionally high levels of energy efficiency and low utility bills for our residents. The conversion of Jarnac Court in Dalkeith is also now complete and will soon be providing
temporary housing accommodation. The Education Learning Estate Strategy programme continues to progress this year and currently covers approximately 30 projects at
various stages of development. Destination Hillend continues to move with the first package of works, relating to the upgrade of the junction at the entrance are now out to
tender and relevant planning applications are progressing. A public consultation exercise was completed for the A701 Relief Road and that project is also progressing, with
the imminent selection of a preferred route and publication of the Stage 2 Scottish Transport Appraisal Guidance report. Utilising the Place Based Investment Fund, we have
also invested in further public realm upgrades in Penicuik Town Centre, a new mobile library bus and a pop-up park in Newtongrange Town Centre.
Areas of improvement
Average time to complete non-emergency repairs has remained off target (78 days) throughout this year. The yearly average taken across all quarters is 15.27 days. Whilst this
indicator is off target there has been improvement over this year with completion times from 17.95 days in Q1 to 14.49 days in Q4. Suppliers are reporting production levels are
improving to pre-COVID output but there are issues with delivery of materials and workforce challenges with contractors unable to meet demand.
Due to changes in the Energy Efficiency regulations affecting the Scottish Housing Quality Standards criteria, 431 houses were identified during Q3 as failing Energy Efficiency
Standard Scottish Housing. We have reduced these failures from 431 to 160 to meet the 2025 targets. However, with the Electrical Installation Condition Reports (EICR’s) now part
of the SHQS from the 31st March 2022 we have found that 4733 fail assessment and therefore we have 34.3% meeting standard due to this. It should be noted that 100% of
smoke alarm devices comply with current legislation.
93.92% of completed first priority
housing repairs within 24 hour target
during Q4
88.34%of completed second
priority housing repairs within 7 day
target during Q4
Building Services
7 Targeted indicators, 3 data only indicators
5 off Target
Continue to deliver the Building Standards continuous improvement plan which forms part of the nationally adopted performance
framework and is submitted to the Scottish Government.
Continue to deliver the additional programmes of work identified by the house condition surveys to maintain Scottish Housing
Quality Standard for the Councils housing stock.
Deliver the Energy Efficiency Standard for Social Housing (EESSH) programme.
Continue to improve the delivery of Building Maintenance services through the review of mobile working, process improvements,
income and productivity.
Implementation of the Local Authority Carbon Management Plan and General Services Capital programme.
Page 61 of 96

Page 62

23,730
12,430
29,380
36,725
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Total hours used for cleaning
in primary schools
13,708.80
7,180.80
16,972.80
21,216
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Total hours used for cleaning
in secondary schools
12,016.20
6,294.20
14,877.20
18,596.50
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Total hours used for
Janitorial services in schools
Property and Facilities
Management
0 targeted indicators
6 data only indicators
Key highlights
• Net Zero: coordination of the cross border consultancy project in relation to the Local Heat and Energy Efficiency Strategy (LHEES) and the appointment of consultants to assist
in the development of the LHEES is in progress.  Geospatial Information System staff are assisting with the sharing and collation of Heat mapping, Energy Performance Data
(housing) and associated socio/economic data to inform LHEES and Energy Efficiency Standard for Social Housing programmes. 
• Property Asset web page: In conjunction with the Economic Development Service, property enquiries web page was successfully launched this year, with improved enquiry
forms and the facility to offer virtual viewings, leading to a significant increase in offers and enquiries.
• Newtongrange Library: Missives to acquire the site to the rear of the Parish Church are being progressed and a number of intrusive site surveys are currently being carried out
in support of the suspensive conditions. The Head of Development is leading a community engagement exercise with the Church and local community on the proposal for the
Library and wider area.
• Energy Centre: Positive progress made on the initial Midlothian Energy Limited business plan and initial capital projects. Key agreements progressing well with a view to securing
Scottish Government funding and the construction of the new energy centre. 
• School dining rooms re-opened this year to resume normal school meal provisions across primary and secondary schools. 195,924 Nursery meals provided, 488,133 Primary
meals provided and 32,497 High School meals provided totalling 716,554 meals provided over the year. In addition successful introduction of P4 and P5 free school meal
provision.
• Cleaning and Janitorial Services continued to support across all council buildings and schools this year in response to ongoing COVID cases.
Areas for improvement
Stobhill Depot: Despite very good progress with Blue Light services Scottish Fire and Rescue have advised that the site is now one of several under review. The depot site redevelopment
site has been confirmed and matters are progressing on the basis that the Council will keep the identified Blue Lights site available for the time being but have advised that in the not too
distant future a final decision will be made. Key issues will revolve around planning and compatible uses and optimisation of land receipts.
Due to Covid 19 enhanced cleaning and janitorial services has continued to take place during Q4 in all schools, resulting in continued increased weekly hours.
Asset based
Modern
Hub and Spoke
Preventative
Develop carbon reduction targets for Council properties and support of sustainable low carbon energy targets and district heating
schemes.
Support the delivery of the Economic Renewal Strategy through the letting and sale of Property Investment Account properties.
Lead the acquisition and disposal of identified sites in Capital and Local Plans, Learning Estate and Housing programmes and the climate
change agenda.
Continue to deliver Building Rationalisation and hybrid working.
Maintain compliance and review Health and Nutrition of school meals in accordance with new Scottish Government legislation. 
Increase revenue throughput the commercial sector of catering services.
Continue to provide a catering and facilities service that reacts to, and meets the requirements of the Early Years expansion programme.
Page 62 of 96

Page 63

40
51
27
37
18/19 19/20 20/21 21/22
Re-let time temporary
accommodation properties
(Days)
Target (35 days)
49
54
46 46
18/19 19/20 20/21 21/22
Re-let time permanent
properties (calendar days)
Target (45 days)
Housing
5 targeted indicators, 0 data only indicators
3 indicators off target
Key highlights
• Midlothian Council’s Strategic Housing Investment Programme (SHIP) was submitted to the Scottish Government in November 2021. To address the need for
affordable housing, the SHIP details potential sites for 2,446 new affordable homes to be built between 2022/2022 and 2026/27.
• There were 4,237 active housing applicants placed on the Common Housing Register at the end of this reporting period.
• 431 permanent homes have been provided to housing list applicants via the common housing register since 1 April 2021. An increase in 104 lets (32%) in
permanent homes compared to last year.
• 95% of new tenants were very satisfied with their new council home and experience with the Housing Team. 100% of new tenancies were sustained after 12
months.
• During this reporting period, 99 households were assessed as homeless, with 385 households assessed since 1 April 2021. It is a positive decrease of 22% in the
overall number of homeless households assessed compared to 493 households assessed during 2020/21. Since 1st April 2021, 790 households have been
provided with advice and assistance compared to 515 for 2020/21. During 2021/2022 48 temporary properties have been successfully converted to permanent
tenancies. The service has also progressed the delivery of 22 ‘Housing First’ cases.
• Midlothian Council’s Rapid Rehousing Transition Plan (RRTP) was submitted to the Scottish Government on 30th June 2021. This sets out a vision that by 2024:
an increased number of homeless households will obtain permanent accommodation, no homeless household will be accommodated in bed and breakfast
accommodation, and the average time taken for the Council to complete its homeless duty will have halved from 105 to 52 weeks. As of quarter 4 the length of
time homeless applicants waiting until receiving a permanent housing is 85 weeks which has steadily improved throughout the year with a reduction of 42 weeks
in comparison to Q1. Re-let time for permanent properties has improved to 39 days this quarter compared to 52 days in the previous quarter.
Areas for improvement
There continues to be a significant demand placed on homeless and temporary accommodation services. A potential key challenge will be an increase in homelessness as
the financial measures put in place to protect households during the Covid pandemic are now withdrawn, alongside the recent increase in energy, food and fuel costs,
requiring a comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition Plan 2021/22.
Holistic
Modern
Hub and Spoke
One size fits one
Increase the number of homeless households that obtain permanent accommodation, and half the average time taken to complete
homeless duty from 105 weeks to 52 weeks.
Implement Midlothian Council’s Allocation Policy.
Implement the approach to housing those with complex needs through a ‘Housing First’ model.
Review void management to minimise re-let timescales and further development of our tenancy support to improve the sustainability
of tenancies.
Introduce a new strategy to reduce drug deaths within Midlothian homelessness accommodation.
85 weeks wait time until homeless applicants receive a permanent housing
option. Over this 21/22 we have improved this position compared to 127 weeks
in Q1 and 103 in Q2 and 99 in Q3. To note: The Council’s Rapid Rehousing Transition Plan
set a target of 52 weeks by 31 March 2024.
70weeks was length of time homeless applicants spent in Temporary
accommodation. Lets to legacy homeless applicants resulting in increased time
spent in temporary accommodation. To date, an average of 70 weeks spent in
temporary accommodation compared to 93 weeks for 2020/21.Page 63 of 96

Page 64

911 959
740 702
18/19 19/20 20/21 21/22
Number of lighting columns
replaced (cumulative)
Target (700)
50.80%
47.30%
51.1%
48.40%
45.10%
19/20 20/21 Q1
21/22
Q2
21/22
Q3
21/22
% of total household waste
that is recycled(Tonnes)
(cumulative)
Target (54%)
1.67%
0.85%
0.54%
2.05%
18/19 19/20 20/21 21/22
% of total road network
resurfaced (cumulative)
Revised Annual Target (1.1%)
Neighbourhood Services 
14 targeted indicators, 2 data only indicator
2 off target 
Key highlights 
Very good progress with annual Capital Works Programme for carriageway resurfacing, despite ongoing impact of COVID-19 with 8 carriageway resurfacing schemes undertaken, utilising
entirely framework contractors.  9.9km of carriageway has been resurfaced for the year (1.4% of the total road network) under the Capital Works Programme, and an additional 4.14km
resurfaced during Q3 and Q4 as part of the Residential Streets programme totalling 14.04km of carriageway resurfaced this year (2.05% of the total road network).  In addition 702 new lighting
columns were replaced with LED lanterns and an upgrade of 350 sodium lighting units. 
Successful delivery of winter service including responding to a number of storms this year. Land services/Kickstart staff have been working with roads staff to ensure winter readiness. The
winter service manual was revised in partnership with cross council service areas and communities. Road Services have worked with Property Services to carry out a review and condition
survey of all grit bins, as well as responding to individual community requests,  using the Geospatial Information System mapping system for assets to show locations and facilitate requests in
real time, and this is now available to view via the Council’s website,
In-cab units to allow Waste Services to move to a Digital Depot way of working have been received following a successful funding bid to the Scottish Government’s Recycling Improvement
Fund. The intention is that these units will integrate with the new Customer Service Platform allowing service requests to be closed in real time. In addition, a preferred contractor has been
identified to collect household waste for reuse from Stobhill Recycling Centre, and setting up a reuse cabin will be progressed in Q1. 
Landscaping project works: completion of 5 playground and Auld Gala Park with various tenders underway including Waterfall Park, Kings Park, Easthouses Park, and a pump track at North
Middletown to continue into 22/23. The ranger service continues to engage with communities and volunteers on various initiatives. All 7 sites inspected this year and tree works for all sites
complete. A Green Flag award was received for the Penicuik to Dalkeith walkway. Volunteering has been restricted by Covid over the last year, and although off target, groups and event
numbers are increasing. The annual target of 9,000 reflects pre-pandemic figures. During 21/22, 4,821 hours were used in the countryside of which we expect this to increase next year. 
Areas for improvement 
Progress with annual Capital Works Programme for footway resurfacing due to focus on carriageway works is off target for the year. 3.82km of footway resurfaced to end of Q4. Our annual
target was increased from 0.56% to 0.76% in Q3 to include the Residential Streets Programme work which will continue into Q1. Domestic residual waste collection tonnages remain high this
year and recycling rates have not increased over the course of this year which is a continued trend from the COVID pandemic. 
Domestic residual waste collection tonnages remain high. This is likely to impact the household waste recycling rate for 2021. 
Holistic
Sustainable
Preventative  
One size fits one
100% of all street lights completed
within 7 days 
.  0.54% of footpath network resurfaced
this year
.  8.2% of Council fleet which
is ‘Green’ 
.  £298,760 spent on staff travel costs
this year
. 
Transform service delivery through the adoption of digital and mobile platforms. 
Improve and expand active travel and public transport for Midlothian residents. 
Continue to progress actions to reach the Scottish Government targets to recycle 70% of all waste. 
Develop a comprehensive asset database management plan for all Neighbourhood Services assets.  
Continue to invest in the workplace across all Neighbourhood Services teams to develop sustainable career pathways and generic working
model to grow talent and foster leadership opportunities. 
Page 64 of 96

Page 65

25 28 31
38
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of  new Business
start ups (LGBF)
82% 83%
74%
80%
18/19 19/20 20/21 21/22
Determine 80% of planning
applications within target (2
months for a local application and
4 months for a major application).
Target (80%)
Planning and Economy
2 targeted indicator, 1 data only indicator
no indicators off target 
Key highlights
• The Locate in Midlothian website continues to be a valuable tool for employability opportunities and employment support. Each social channel is targeting different audiences and
each is performing well in terms of audience growth and interaction.
• This year we have continued to maximise opportunities to support recovery of the tourism sector by supporting the development of the tourism forum’s digital presence and
representation on the steering group. A member benefit has been included with a quarterly roundtable meeting with Economic Development and Business Gateway to raise
challenges and opportunities- early intervention in new initiatives can help accelerate those that will encourage more visitors to Midlothian. Business Gateway has referred 40
businesses to Midlothian Tourism Forum and membership is now at 55.
• Tyne Esk LEADER Scottish Rural Parliament project is now completed with a Midlothian/East Lothian needs based funding strategy produced. This will help to inform the way forward.
Close links with communities have been fostered and communities are open to further engagement with the Scottish Rural Parliament. Opportunities that may arise are with the
Scottish Rural Youth Task Force/Scottish and Rural Islands Youth Parliament for young people, with Tyne Esk as potential first hosts, and Scotland’s Older People Assembly for older
people.
• Town Centre Capital Fund, of the seven applications approved (£910,000) all projects are now complete with Penicuik Town Hall completing this quarter. Further public realm works
have also recently received funding through the Place Based Investment Fund.
• Local Procurement: We have a dedicated officer in economic development and although progress has stalled over the Covid years due to capacity in both teams, we are in a good
position to now take this forward with momentum as businesses are more comfortable directing resource at future opportunities. Addressing a gap in the learning cycle, we are
introducing a procurement mentor to the client journey providing 121 support; this should increase the volume and quality of local bids.
• The Planning Service has recovered approximately £11.8m and secured £12.9m in developer contributions in 21/22 towards: new schools; community facilities; sport, leisure and play
provision; transport infrastructure; and town centre improvement projects.
• The Planning Committee this year have granted various permissions for significant strategic planning applications leading to new tourist facilities, investment and job creation.
Areas for improvement: Mitigating the Scottish Government’s decision to reject the Strategic Development Plan (SESplan2) for the South East of Scotland that leaves Midlothian and the
other Council’s in the region without an up to date strategic development plan. Number of Business starts ups remain lower than previous years after the impact from Covid, however the
total number of start-ups for the year to date 2021/2022 represents an increase of 65% for the same period in 2020/2021. Initiatives in place to promote and encourage businesses where
possible in the current climate.
Sustainable
Preventative
Holistic
Hub and Spoke
Discretionary fund processed and complete this year,
full funds awarded totalling£1,561,947.00
12,714visits to Locate in Midlothian’ site during Q4. Total
number of visits since April 2021 is 29,672exceeding our
annual target.
Achieve the aims set out in the Planning Performance Framework (PPF)
Continue to embed the Climate Change Strategy and deliver against the action plan.
Implement year 3 of a 5 year Penicuik Heritage project which delivers public realm improvements and investment in heritage assets in the town
centre
Draft and adopt supplementary guidance on the ‘Quality of Place’ which will be used as a tool to enhance place-making within Midlothian
Draft and adopt supplementary guidance on ‘Developer Contributions’ which will be used as a tool to secure financial contributions towards
infrastructure to meet the demands arising from new development
Implement the statutory requirements of the new Planning Act 2019 which places additional burdens onto the Planning Service
Deliver on the objectives identified in the Strategy for Growth 2020-25
Maintain and grow the client reach of Business Gate way services in Midlothian and continue to develop locate in Midlothian
Page 65 of 96

Page 66

7
30 22
70
122
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
Number of primary
inspections conducted
(quarterly)
87.80% 88.50%
79.50%
81.80%
77.90%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
% of consumer complaints
completed within 14 days
(cumulative)
26%
8.20% 12.70%
28.20%
40.00%
Q4
20/21
Q1
21/22
Q2
21/22
Q3
21/22
Q4
21/22
% of Tobacco retailers   visited
(cumulative) 
Protective Services 
4 targeted indicators, 6 data only indicators
2 off target 
Key highlights 
• Midlothian Council Asymptomatic COVID-19 Testing Programme commenced in 2021 with a team of staff recruited, trained and testing delivered across various sites
throughout Midlothian. Much focus for staff in Protective Services has been placed on the COVID testing programme. 1,520 Covid tests were undertaken at asymptomatic
testing sites (ATS). Outreach activities for ATS kit dispersion were very successful towards the last part of this year with cooperation of the various venues being crucial.
58,308 test kits handed out, 30,641 of which in Q4. Whilst Q4 saw the expansion of the COVID-19 testing programme with mobile testing and LFD distribution continuing
throughout the area and the introduction of a wider outreach programme educating the general public regards the correct usage of the testing device,  ATS testing will
stand down in accordance with Government timetable in Q1 22/23. 
• As a result of active involvement or advice by the Trading Standards Service, refunds of at least £45,000 were made to consumers this year; at least £3,150 this quarter.
There was also a refund for a local business of £1,136 last quarter. 
• 244 primary inspections were carried out this year 21/22. 122 in Q4. This year included inspections from the previous year which could not be carried out because of COVID-
19. The number of inspections annually is dependent on the number of business premises risk assessed for inspection. Some fluidity is required in that existing premises
cease trading and new premises open and may require inspection.
• A total of 274 Trading Standards consumer complaints were received this year with 272 completed and 212 completed within 14 days. Although marginally off the targeted
80%, completion is not fully within service control as complainants and traders can be slow to respond to enquiries. Trading Standards seek to contact consumers and
traders as early as possible to maximise time. In addition to consumer complaints, we were proactive in accepting 68 Notifications from Advice Direct Scotland, the national
call centre where 67 were complete   
Areas of improvement 
• An average of 67.5% of public health requests were responded to this year, a reduction compared to 74.4% responded to last year.  This is a result of the Environmental Health team
being diverted to proactively deal with the COVID-19 pandemic. 
• 
Intelligence logging although off target remains strong and one of the highest in Scotland for our authority size. Figures are dependent on justifiable intelligence.
ce. 
•  
Holistic
Preventative
Hub and Spoke
One size fits one   
17% of dog control investigations requiring statutory
enforcement action this quarter. 
67.4% of all Public Health service requests responded to during 21/22, with 56.4% responded to
within required timescale.
. 
Continue to support the Council’s response to the pandemic and recovery programme 
Continue to deliver the Council’s regulatory functions with respect to food hygiene and standards regulations
Regulate Health and Safety across Midlothian through the investigation of workplace accidents
Restart a programme of test purchase for under-age goods
Implement a robust business continuity management system and business continuity approach 
Continue to identify and respond to incidents of rogue trading  
58,308 home test kits handed
out across all locations during
21/22. (30,641 during Q4).  
1,520 COVID tests undertaken
at asymptomatic test sites this
year. 
Page 66 of 96

Page 67

1 
Midlothian Council Annual
Performance Report 2021/22 
Progress Against Strategic Outcomes
The Route Map through and out of the crisis, approved by Council in June 2020, set out how the Council would work
with its partners and communities to put the necessary changes in place to support recovery from the pandemic and
to meet the challenges ahead.   Our focus in supporting the recovery and retaining the best elements of
transformation that took place in response to the pandemic has been to secure permanent changes to the way the
services are delivered in order to build back better. 
Each service has a Service Plan which provides a link to the outcomes contained within the commitments of the
Single Midlothian Plan, the Route Map through and out of the crisis, the Listen and Learn report, any relevant
legislation that is specific to the service and to the strengths and improvement activities identified as part of self-
evaluation. 
Service plans translate ‘what we intend to do’ into ‘how we will achieve it’. There is a clear link between the priorities
in the service plan and those identified in the SMP and the Council's strategic priorities. Whilst detailed progress for
individual service plans are provided quarterly the following provides a summary of key updates against the five
overarching thematic areas within the Single Midlothian Plan as follows: 
• Adult Health and Social Care - Responding to growing demand for adult social care and health services 
• Community Safety & Justice - Ensuring Midlothian is a safe place to live, work and grow up in 
• Getting it Right for Every Midlothian Child - Improving outcomes for children, young people and their
families. 
• Improving Opportunities for Midlothian - Creating opportunities for all and reducing inequalities. 
• Sustainable Growth in Midlothian - Growing the local economy by supporting business growth and
responding to growing demand for housing in a sustainable environment. 
Whilst a full update for the performance for each of the Council’s Service areas is published separately, this report
reflects an overview of the key service updates, against the thematic areas of the Single Midlothian Plan. 
Single Midlothian Plan Themes in 2021/22 
Adult, Health and Care - Achievements
Responding to growing demand for adult social care and health services 
Our Vision: People in Midlothian are enabled to lead longer and healthier lives. 
Our Values: Right support, right time, right place. 
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes all
community health and social care services for adults in Midlothian and some hospital-based services such as
Accident and Emergency. 
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP is
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The IJB Strategic Plan 2022-25  
will be published in April 2022. Consultation and engagement in the development of the plan included the views of
over 3000 people, with the feedback received shared on an ongoing basis with all planning leads and senior
management to ensure this could be taken into account in the finalisation of the plans. A summary of Consultation
and engagement across the development of the plan can be found in the Midlothian Integration Joint Board
Strategic Plan 2022-2025 Consultation
Report.                                                                                                                                                                                                                                                                                                                                                                                                           
HSCP COVID-19 Response
Covid-19 continues to bring challenge and disruption across the Health and Social Care Partnership, its partners,
and the communities it serves. While the challenges we face may have changed since 2020, the need to adapt and
Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.7 
Page 67 of 96

Page 68

2
flexibly respond to both new and evolving challenges in health and social care has continued throughout 2021, and
into 2022. This has resulted in increased demand and sustained pressure across the whole system. The main
challenges in were the Omicron variant and the subsequent spread of infection within the community, staff absence,
and both care home and ward closures relating to covid outbreaks. There was increased anxiety and pressure on
many service users, unpaid carers and staff. 
Even in the most challenging of circumstances, teams have continued to work flexibly, collaboratively, and
innovatively to manage this demand. By working together, services taken steps to reduce inappropriate admissions,
reduce length of stay, facilitate earlier appropriate discharge and reduce unnecessary delay wherever possible. 
As we begin to emerge from this most recent peak of infection rates, the Partnership continues to hold the safety of
clients, carers, communities, and staff as its top priority. Services have been able to continue to adapt and find new
and innovative ways to deliver service offers effectively and safely. Many services have increased the number of
video consultations, adopted new digital approaches and taken a proactive outreach approach. Reduced
opportunities for carer respite have remained a concern. 
Despite the challenges faced by all our services, staff and partners, the opportunity to work together in new ways has
helped develop our existing and build new community connections. Volunteering programmes continued and were
further supported by the Partnership. 
Learning Disabilities
Work continues to ensure Midlothian compliance with the national timescale for the reduction of inappropriate
hospital admissions, delayed discharge, and out of area placements for people with complex care needs. Midlothian
remains in a relatively good position in this respect as a result of the housing programme, the work overseen by the
Positive Behavioural Support Steering Group, partnerships with third sector organisations specialising in support for
people with Complex Care needs in local communities, and the development of local intelligence about people at
high risk of family or placement breakdown. 
The Midlothian Learning Disability Planning Group is supported by ‘Expert Panels’ that draw together experts,
including people with lived experience, to develop solutions in implementing specific areas of our Strategic Plan. As
part of Equal Midlothian Week the Human Rights Panel, led by People First Midlothian, held the first of a series of
Human Rights sessions focussing on Supported Decision Making and how we can support people to feel fully
engaged in decisions about their lives. 
Older People
Extra Care Housing: As with many other areas, Midlothian faces many challenges in addressing the housing and
care needs of an ageing population with increasingly complex requirements. Extra Care Housing is a model of
accommodation and care that supports people to live in their own tenancy. Work was progressed on 3 sites to
provide ECH bungalows or flats. Timescales were impacted by Covid 19 but completion dates are still estimated as
to be complete by spring/summer 2024.  
Care Homes: Midlothian has 10 older people’s care homes, 2 of which are HSCP run with one being an intermediate
care facility. The remaining 8 are privately run either by private companies, charitable organisations or independent
care homes. Health Boards and local Health and Social Care Partnerships continue to carry responsibilities for the
clinical and professional oversight of the care provided to people resident in care homes in line with the Scottish
Government guidelines (May 2020). 
The Care Home Support Team has provided substantial support to care homes for older people to address the
challenges faced throughout the Covid-19 pandemic. Examples include the provision of direct support to meet
staffing challenges, input to meet the complex care needs of individual residents, vaccination, testing of staff and
residents, support with the reintroduction of visiting and providing practical and emotional support to staff affected by
the impacts of the loss of residents in unprecedented numbers. 
Care at Home continues to be a key contributor to the HSCP vision for people to receive the right care in the right
place; in their home and community as far as possible. It supports efforts to reduce length of hospital stay, as well as
admission avoidance. Care at Home is currently provided by the HSCP and external providers. Midlothian
experienced significant pressures within Care at Home services over the last 12 months. This was in line with the
national challenges to recruit care staff. Despite this pressure, Care at Home worked hard to ensure packages of
care continued to be delivered. 
Carers
In early 2021 services were re-commissioned in line with changes in Carer’s Act legislation and the carer support
service review and consultation undertaken in 2020. The new contracts were implemented 1st July 2021 with VOCAL
Midlothian and British Red Cross as key agencies. The key themes of the contacts are: (i) Carer Identification,
Page 68 of 96

Page 69

3
Information and Advice Services (including financial advice) and (ii) Carer Health and Wellbeing (including breaks
from caring). 
A series of workshops held in the summer of 2021 supported collaborative discussions on how best to utilise the
Scottish Governments announcement of additional funding for carers. Feedback and consideration of how proposals
met strategic aims or supported existing work was fed back to SMT and the Performance and Finance group.
Progress is now being made towards payment of carer additional resource allocations to community partners; target
would be for this to be in place for payment during Q1. 
Mental Health
The Mental Health Strategic Planning group developed the Mental Health Action Plan reflecting the priorities set out
in the Midlothian HSCP Strategic Plan. Primary Care Mental Health Nurses are now in 12 practices across Midlothian
and we have appointed to the OT role to supplement the service. Evaluation of the impact of primary care nurses is
ongoing and is a blend of quantitative and qualitative data. Current findings are positive. 
Adults with Long Term Conditions, Disability and Impairment 
Sight Scotland continue to provide information sessions to staff in relation to the services they provide. Work has
commenced with Deaf Action to review the work being undertaken. 
Sport and Leisure 
Most sites are operating as near to “normal” as possible with the re-introduction of a wide range of programmes and
activities on offer, including swimming lessons, fitness classes, MAC classes, Ageing Well activities as well as
accommodating local sport/activity clubs and organisations. 
The Ageing Well programme of activities is nearly back to pre-covid levels in terms of the range of activities on offer  
Sport & Leisure services will continue to develop its digital capabilities including an expanded role out of online
booking and advance payment for all activities.
Community Safety – Achievements
Ensuring Midlothian is a safe place to live, work and grow up in 
Justice Service: 
Service delivery focused on managing individuals in the Justice system through a mixture of face-to-face and virtual
meetings. This continues to be based on dynamic assessments using risk and needs to determine levels of
involvement 
Substance Misuse: 
Key services based in Number 11 in Dalkeith continued to provide services including outreach treatment, injecting
equipment provision [IEP], naloxone, and information/advice. During Covid restrictions the Midlothian Substance Use
Service instigated an outreach model to those individuals who were most at risk. This includes the provision of
Buvidal [an injectable form of Buprenorphine]. 
Getting it Right for Every Midlothian Child - Achievements
Improving outcomes for children, young people and their families
“All children, young people, adults and families in Midlothian are supported to be the best they can be. This
is achieved through a nurturing, respectful and collaborative approach that promotes wellbeing, equity and
inclusion.” 
The Promise: The Promise is a key driver for moving forward and shaping the future of children’s services.
Following a nationally published report which was initially critical of Councils for what was perceived to be a lack of
progress towards the commitments, Midlothian Council has played a key role in providing CoSLA with information to
showcase the work being done. Our local report was developed around the five priority areas and key milestones
which are:  A Good Childhood; Whole Family Support; Supporting the Workforce; Planning and Building Capacity 
National Child Protection Guidance: The new National Child Protection Guidance has been published. The
national implementation group which Midlothian is part of, is responsible for implementing all the actions and have
already commissioned someone to write local procedures. 
Mental Health Services: The increase in the number of referrals for support for mental health over the past year has
proven to be a challenge across the country. With the additional funding from government we have worked with our
third sector colleagues and developed many opportunities such as nurture and wellbeing sessions, adult counselling,
art therapy, family support and counselling and play therapy to name but a few of the sessions people can access.
These groups offer early support for mental health and wellbeing. 
Page 69 of 96

Page 70

4
Equipped for learning Digital devices to support learning have been provided to every secondary school pupil as
part of the Equipped for Learning programme. These devices are being used daily in classrooms and at home.
Specific pedagogical approaches, linked to the use of digital technology in the classroom are being trialled 
Attainment and Achievement: Improve attainment within the Broad General Education (BGE) stages: 
The Scottish Government (SG) published the National Improvement Framework (NIF) Report 2021 and Improvement
Plan 2022 December 2021. The SG NIF report highlighted the impact of the pandemic on attainment within the BGE
with the attainment gap widening between the most and least disadvantaged children. 
At P1, performance in listening & talking, reading, writing and numeracy were all above the national figures. 
Performance in listening and talking at P4 and P7 is in line with the national picture. 
At P7, fewer children attained the expected CfE level in numeracy and this has been a key focus for schools in terms
of closing the learning gap caused by the pandemic. Overall, the Midlothian CfE data mirrors the national picture and
a Building Back Better Recovery Programme was initiated within identified schools and/or stages. The Building Back
Better team matched expertise to need, and targeted schools with the largest gaps 
Improving Opportunities Midlothian - Achievements
Creating opportunities for all and reducing inequalities
Customer Services Strategy The Customer Service Strategy defines the key drivers that will enable Midlothian
Council to deliver ‘customer service excellence’ to our communities. It outlines the commitment to provide choice to
the customer in the way services are accessed and provided. This includes innovation, partnership working and
optimising the use of technology within resource constraints. The strategy will help us to change the way we deliver
services utilising the latest technologies and linking to national frameworks. 
The Council cannot support more customers using the current resources, systems and processes. This means that
the adoption of digital and automated processes will be key to continuing to provide a seamless customer journey,
satisfying enquiries at the first point of contact and meeting increased demand. 
Customer self-service and new automated processes can help deliver some key services without customers dealing
directly with a member of staff and could truly transform the way the Council deliver services. During 2020/21,
increasing the pace of digital transformation, particularly in front-facing customer services, will be a service and
corporate priority, for Midlothian Council – one that can deliver the required efficiencies without negatively affecting
customer experience. 
Reducing Poverty:  There is a renewed focus on ensuring we return to pre-Covid numbers at youth clubs as a
priority in order to re-engage young people who have experienced disruption to their education, training and
employment opportunities. Identifying and supporting this group is key if we are to improve their longer term
outcomes as they enter adulthood. 
The Community Planning Partnership has approved a one year strategic poverty prevention group, co-chaired by
Dona Milne. The operational child poverty group led by CLLE and Health has completed the final Local Child Poverty
Action Report (Year 3) and this is going through governance arrangements before submission. The child poverty plan
will focus on poverty prevention and early intervention, particularly income maximisation, cost of living, income from
employment and income from benefits. 
Supporting local people to secure employment or learning opportunities – Improving skills, for learning, life
and work: Our employability programmes for all ages have experienced an increase in numbers of local people
accessing them. There has been an increase in the number of employers accessing the employment recruitment
incentive which we operate as part of our youth guarantee (YPG) support via local businesses accessing this fund.
Through YPG funding we have been able to extend a significant number of Kickstart Placements. 
Supporting young people through youth work and wider learning opportunities:  The youth work service has
provided opportunities for young people.  CLLE operated transitional support to P7s going to high school programme
in each cluster. There are lunch time secondary school drop-ins for youth work for young carers in each cluster. The
Bounce project is a diversionary project for those at risk of offending and has completed working with the second
cohort of young people. These young people have not reoffended whilst engaged with the project. 
Sustainable Growth - Achievements
Page 70 of 96

Page 71

5
Growing the local economy by supporting business growth and responding to growing demand for housing in a
sustainable environment
“Place is where people, location and resources combine to create a sense of identity and purpose. The Place
service ambition is to deliver joined-up, collaborative, and participative approaches to services, land and
buildings, across all sectors within a place, enabling better outcomes for everyone and increased
opportunities for people and communities to shape their own lives.” 
Over the past year, innovative ways of working have been introduced and services adapted to respond to the needs
of our citizens at pace, in particular those experiencing the greatest levels of poverty and inequality. This has resulted
in a complete transformation of how the Council works. Services are continuing to build on this learning moving
forward, harnessing the energy, flexibility and creativity demonstrated by our workforce, to embed a culture of
continuous improvement and innovation. 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a Locality approach to service delivery adopted,
developed in conjunction with community planning partners. The opportunity to review and redesign services that the
pandemic has provided will result in a more efficient and effective operation of sites within local communities. This
will improve service delivery, and ensure better outcomes for local communities. The continued rollout of enhanced
ICT capabilities will strengthen cross service working, produce resource efficiencies and support the localisation of
services. 
Environmental: Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change
Declaration, publicly acknowledging the challenges and opportunities that climate change brings with a commitment
to make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate
Change Strategy and focus continues to achieve future emissions targets.  The ambitious strategy sets out how we
will reduce our greenhouse gas emissions, encourage and work with others in our community to mitigate and adapt
to changing climate. The strategy incorporates an action plan with a number of initiatives and ongoing programmes
which together are helping to reduce our emissions and carbon footprint. 
Economic: Midlothian Council’s Economic Renewal Strategy sets out its ambitious approach to managing the
transition from lockdown and planning for the longer term challenges the local economy will face, the strategy aims
to mitigate the adverse economic impact on the local economy from COVID-19. Key aims are to protect jobs and aid
business recovery using a place based partnership approach that maximises the opportunities developing from the
pandemic. Taking this partnership approach, the strategy will foster entrepreneurship, upskilling and training,
addressing gaps in the market and changing the way business is done to better align this to customer behaviour.
Alongside support for agriculture, tourism and the leisure and hospitality sectors, the council will also promote local
jobs and self- employment opportunities, particularly for young people, to give them the necessary skills and support
they need to benefit from economic recovery. 
The Carbon Charter was refreshed and a marketing campaign developed with the aim of encouraging businesses to
sign up and benefit from developing tailored action plans with our Business Gateway team to support the net zero
agenda. 
Procurement - Procurement allows the Council to repurpose its spending power to drive our key strategic priorities
and to secure the best possible value and outcomes for Midlothian. Effective procurement can maximise the value of
every pound spent in terms of jobs, skills and supply chain opportunities in the local community. We will aim to
address economic, social and environmental considerations at all stages of the procurement cycle within the rules of
open, fair and transparent competition. 
An SME Strategy has been developed to support and assist local businesses to win contracts fairly and transparently
on a competitive market. We will further develop our collaborative and commercial relationships with key partners as
part of our strategic category management approach, to deliver the best possible outcomes for the citizens of
Midlothian. 
Capital Strategy:  As Scotland’s fastest growing local authority area, it is critical to delivery investment in community
infrastructure, such as housing, the learning estate, economic investment and green infrastructure, in the right place
at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living patterns brought
about by the COVID-19 pandemic. Communities need to be able to readily access the services they need. Capital
investment is also an opportunity to support our local economy through job creation and skills enhancement,
particularly in relation to supporting a transition to a green economy as we invest in sustainable, highly energy
efficient buildings. 
Page 71 of 96

Page 72

6
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how we live
now. We will invest in community infrastructure with a focus on place-making, reducing inequalities, improving
economic opportunities and improving education and health and wellbeing outcomes. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so has to
reflect the demands of Council services to ensure positive outcomes are achieved in the right place, at the right time
for the maximum benefit to Midlothian.  The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in the local transport network
and in innovative developments such as the new low carbon heat network in Shawfair. 
Digital Strategy and Digital Learning Strategy: Supported by the appointment of SOCITIM Advisory (Society for
innovation, technology and modernisation) as a strategic partner and led by the Digital First Board work progressed
to deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “empowering People, enabling growth”
aimed at improving the way services are delivered to Midlothian citizens the strategy sets out how local outcomes will
be improved by delivering digital services to digitally connected communities. 
While responding to the pandemic has also transformed the way the council works, and we are already using
technology to allow our services to be more flexible and responsive it was recognised that the Council needs to do
much more to harness the opportunities that a digital approach can bring.  This includes supporting our communities
and local businesses to thrive in a digital world and making sure that our children are prepared for the workplaces of
the future. 
Among the aims set out in the new strategy are plans to:
• Refresh the council’s approach to customer service, focussing on ‘digital first’, while making sure alternatives
remain in place for those who need them 
• Have a council website that meets customer needs , enabling customers to request and pay for services
online and to log in to see their interactions 
• Implement an update service, so that customers contacting the council online can receive follow up text
messages or emails 
• Look at opportunities to automate and better integrate processes so that staff can focus on the things that
matter most to customers 
• Enable people to stay independent and healthy for longer by using data and technology 
• Introduce bookable online and face-to-face appointments so that customers don’t have to waste time
queuing or travelling and to help the council reduce costs 
• Review and improve online engagement with customers, including online consultations, communications and
social media 
• Promote Midlothian as a digital destination, creating an environment that attracts leading digital businesses
to the area and supporting the innovation of start-ups 
• Cultivate digital skills in our communities, ensuring that young people have access to the technology and
support that they need to improve educational outcomes and to prepare them with the skills they need for the
future 
• Reduce digital exclusion and empower learners of all ages, enabling online access and supporting them to
develop digital skills 
• Support Midlothian to achieve high speed connectivity, smart infrastructure and resilient cyber defences 
Housing and homelessness: Midlothian Council’s Strategic Housing Investment Programme (SHIP) was submitted
to the Scottish Government in November 2021. To address the need for affordable housing, the SHIP details
potential sites for 2,446 new affordable homes to be built between 2022/2022 and 2026/27. 
Midlothian Council’s Rapid Rehousing Plan (RRTP) was submitted to the Scottish Government on 30th June 2021.
This sets out a vision that by 2024: an increased number of homeless households will obtain permanent
accommodation, no homeless household will be accommodated in bed and breakfast accommodation, and the
average time taken for the Council to complete its homeless duty will have halved from 105 to 52 weeks. . 
Challenges and Risks
The challenges for Midlothian continue with our recovery out of the pandemic, increasing inequality as a result of
covid-19 and the current cost of living crisis,  the growing and ageing population and the increasing demand for
services that this brings. Midlothian is projected to have the highest percentage change in population size of all
council areas in Scotland. From 2018 to 2028, the population of Midlothian is projected to increase from 91,340 to
Page 72 of 96

Page 73

7
103,945. This is an increase of 13.8%, which is in contrast to a projected increase of 1.8% for Scotland as a whole
with a 40.9% increase in older people over 75.  In addition, Midlothian has 10 zones which fall into the most
deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland.  This pace of growth
demands additional capacity within the school estate to cope with the projected increase in pupil numbers. The
general population growth forecast places additional pressure on our infrastructure, including the growth of the road
network as new development roads are adopted, and increases the demand on essential services such as waste
collection. 
As part of work to address the issue of significant population growth and demographic changes within Midlothian,
the key drivers of change in delivery of sustainable and transformational services and regeneration of our
communities must be viewed holistically. We have endorsed the Place Principle because we are committed to
strengthening the co-ordination and integration of all place based activity. This means we will: 
• consider the benefits of planning, investment and implementation activity at the regional level of place -
where that focus could drive faster rates of sustainable and inclusive economic growth
• ensure that place based work at the local level being led by Midlothian Council and its
agencies/partnerships is taken forward in a way that is integrated and complementary of all the work being
taken forward in associated policy areas and plans
• exemplify the behaviours reflecting the core of the principle, working and planning together with our
partners and local communities to improve the lives of people, support inclusive growth and create more
successful places.
Financial Stability: The settlement for Local Government for 2022/23 was announced in December 2021 and
represented a cash reduction in core grant nationally of circa £100m at a time where costs continue to rise. On 27th
January 2022 a further £120 million one off funding was announced for Local Government. However Councils
continue to face a £251m real terms cut which will increase again in 2023/24 by a further £120m if the one-off
funding for 2022/23 is not baselined within the Local Government settlement. The settlement announced in
December gave Councils full flexibility to set the Council Tax rate that is appropriate for their local authority area. 
It is against that backdrop that the cross party Business Transformation Steering Group considered options to
balance the 2022/23 budget and as part of that the Council Tax policy for the year ahead to enable Council to fulfil its
statutory duty, as set out in Section 93 of the Local Government Finance Act 1992 (as amended), namely to set its
Council Tax and a Balanced Budget for 2022/23 and made recommendations to Council on 15 February 2022. While
Council subsequently agreed a balanced budget and a Band D Council Tax of £1,442.60. Balancing the budget was
reliant of £12 million of one off funding. Accordingly the recurring expenditure of £251 million for 2022/23 exceeds
recurring funding by that £12 million. 
The challenging grant settlement presents challenges not just for the year ahead but over the medium term, with
projections of recurring expenditure to provide services exceeding the recurring funding available. Projections are
that 2023/24 and beyond will require significant service reductions, focusing on statutory requirements as well as
continued service transformation.  
Health and Social Care: The Health and Social Care Partnership, its partners and the communities it serves
continued to be impacted by the COVID 19 pandemic. Covid continued to influence how the HSCP delivered core
services, it impacted on staff absence and deployment, and it required additional resource, for example to deliver
vaccination clinics, coordinate staff testing for HSCP and other staff, and manage PPE provision locally 
A growing and ageing population: Midlothian is the second smallest Local Authority in mainland Scotland but the
fastest growing. This will continue to pose challenges for health and social care services whilst also changing some
local communities. As people live for longer many more people will be living at home with frailty and/or dementia
and/or multiple health conditions. An increasing number of people live on their own, and for some this will bring a risk
of isolation. 
Page 73 of 96

Page 74

8  Page 74 of 96

Page 75

1 
Balanced Scorecard Indicators 
Annual Report 2021/22 
This section of the Council report is presented using the Balanced Scorecard approach. The four
Balanced Scorecard perspectives and key areas of focus are shown in the following table and the
associated key indicators that follow are drawn from across the Councils services. 
Customer/Stakeholder Financial Health
• Improving outcomes for children, young
people and their families 
• Ensuring Midlothian is a safe place to live,
work and grow up in 
• Creating opportunities for all and reducing
inequalities 
• Growing the local economy and supporting
businesses 
• Responding to growing demand for
Housing and Adult Social Care services 
• Maintaining financial sustainability and
maximising funding sources 
• Making optimal use of available resources 
• Reducing costs and eliminating waste 
Internal Processes Learning and Growth
• Improving and aligning processes, services
and infrastructure 
• Developing employee knowledge, skills and
abilities 
• Improving engagement and collaboration 
• Developing a high performing workforce 
Each of the perspectives shown above are supported by a number of key measures and indicators which
ensure that the Balanced Scorecard informs ongoing performance reporting and helps to identify areas
for further improvement. The strategy map below provides an at a glance summary of the key
performance indicators identified for the Single Midlothian Plan and under each of the perspective
headings of the Balanced Scorecard. Detailed performance data is available in the quarterly service
performance reports. 
Performance Review and Scrutiny Committee
Tuesday 21 June 2022
Item 5.8
Page 75 of 96

Page 76

2  Page 76 of 96

Page 77

3
Single Midlothian Plan - Key Indicators 
Reducing the gap in economic circumstances 
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Midlothian Citizen Advice Bureaux (CABs)
will generate an income maximization of
£625k per quarter
£3,704
,161
£3,352
,380
£4,401
,850
£3,055
,703
£5,703
,704  
21/22: On Target   £2,500,00
0
Relative to Scotland, Midlothian can
demonstrate a 1% reduction in child
poverty. Currently the Scottish Average is
22% and Midlothian is 22.5%
22.5% 22.5% 25% N/A 23.9%   21/22: Off Target 
23.9% of children
are living in
poverty after
housing costs
compared to 24%
nationally  
21.5%
Ensure the number of unemployed adults
in Midlothian does not increase beyond
existing levels
N/A 3.6% 2.7% N/A 2.9%   21/22: On Target   3.5%
Ensure the number of workless
households in Midlothian does not
increase beyond existing levels
N/A 12.4% 11.6% N/A 13.5%   21/22: On Target   18.1%
Midlothian Council Welfare Rights Team
(WRT) will generate an additional benefit
income maximization of £625k per quarter
N/A £4,407
,373.0
9
£4,411
,105.2
4
N/A £4,320
,090.0
0
21/22: On Target   £3,000,00
0.00          
7
14
0
4
0
2
4
6
8
10
12
14
16
Off Target On Target Data Only This data is not available yet
Page 77 of 96

Page 78

4
Reducing the gap in health inequalities
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Number of people supported with Cancer -
Welfare Rights Service (cumulative)
240 316 265 239 270   21/22: On Target   250
Total number of people attending activity
groups hosted by Ageing Well each year
739 21,446 21,427 3,895 18,394   21/22: Off Target 
The project
currently delivers
45 activities per
week supported by
up to 58 active
volunteers who
contributed 1059
hours of
volunteering during
the quarter. Uptake
of activities has
increased in Q4
from a steady level
in Q2 & Q3.  
20,000
Number of people supported with Mental
Health needs
253 360 336 249 415   21/22: On Target   250
Number of people referred to Weight
Management Triage. (Tier 2 and Tier 3)
159 215 509 190 508   21/22: On Target   200
Number of people attending activity
groups hosted by Midlothian Active
Choices (MAC)
7,845 10,280 9,786 766 3,966   21/22: Off Target 
Impact of ongoing
Covid restrictions
has not allowed the
return of activities
at the largest sites
of Newbattle
Community
Campus and
Lasswade Centre.
Increased access
to these sites is
expected from mid-
April 2022.  
10,000
Number of people on Unpaid Work
Programme attending at least one
appointment with a nurse from the Health
Inequalities Team (HIT)
N/A N/A 8 4 4   21/22: Off Target 
Due to Covid the
Unpaid work team
did not operate face
to face during April
to June and started
group activity in
September.  
10
Number of people in employment or
education following intensive intervention
N/A N/A 6 14 7   21/22: On Target   6
Number of assessments for home
adaptations by Red Cross Link Workers,
as part of frailty assessment.
N/A N/A 161 108 122   21/22: On Target   40
Reduce the number of (all) alcohol related
hospital stays (patients per 100,000
population)
537 541.6 435.08 549.4 N/A   21/22: Data not
available  
537
Annual number of CAMHS referrals 591 774 643 520 747   21/22: On Target   580
Annual percentage seen within 18 weeks
for first treatment
48.8% 52.2% 74.5% 48% 56.8%   21/22: Off Target   90%
Children & Young People's Wellbeing and
Mental Health Strategy approved and in
place
N/A No No N/A No   21/22: Off Target 
The high-level
strategy has been
Yes
Page 78 of 96

Page 79

5
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
approved but the
strategic plan is not
yet in place   
Reducing the gap in learning outcomes 
PI Description 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Percentage of Midlothian Care
Experienced school leavers progressing to
positive destinations
76.92
%
69.23
%
62.5% 92.31
%
80.95
%  
21/22: Off Target
Target for next
year set to the
virtual comparator
score for this year.
Due to the low
number of pupils
involved this
number can vary
greatly from year
to year.
82.43%
Increase the number of care experienced
young people attending the Champions
Group
N/A N/A 101 42 N/A   21/22: Data not
available  
40
Monitor qualification levels at SVQ 1 88.2% 87.6% 84.1% 88.5% 88.5%   21/22: On Target 
The latest
available
information (Jan-
Dec 2020) shows
Midlothian is
above the Scottish
average of 86.2%  
84.2%
Monitor qualifications at SVQ level 4 38.5% 41.8% 42.9% 50% 50.6%   21/22: On Target 
The latest
available
information (Jan-
Dec 2020) shows
Midlothian is
above the Scottish
average of 49.0%  
40.6%
Monitor number of people with no
qualifications
6.4% 7.3% 9.4% 5.3% 5.4%   21/22: On Target 
The latest
available
information (Jan-
Dec 2020) shows
Midlothian is
below the Scottish
average of 8.1%  
8.6%
Number of training events delivered N/A 54 8 15 10   21/22: On Target   10
Page 79 of 96

Page 80

6 
Customer Perspective - Adult, Health and
Care 
1. Adult Health and Care 
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Number of individuals referred through
the Safe and Together approach.
N/A N/A 7 4 4   21/22: On Target   4
Reduce the number of emergency
admissions for people aged 75+ (RIE &
WGH)
2,393 2,266 2,693 2,409 N/A   21/22: Annual data
not yet available 
Validated PHS data
source SMR01.
Current data release
covers the Q1 and
Q2 period only.   
Total number of carers receiving an
adult carer support plan of their care
needs (cumulative)
N/A N/A 665 1,623 2,010   21/22: Data Only   
Number of individuals accessing the
Midlothian Access Point
949 1,092 911 605 1,446   21/22: On Target   600
Number of Health & Social Care staff
who have participated in face to face or
on-line training
1,741 1,595 979 1,171 1,021   21/22: Data only 
Training data for
Adult and Social
Care. 
Data source:
Learnpro   
Decrease the percentage of falls which
result in a hospital admission for clients
aged 65+
3.8% 7% 4.4% 3.77% 2.32%   21/22: On Target   6%
Maintain at zero the number of patients
delayed in hospital for more than 2
weeks at census date
16 20 1 4 10   21/22: Off Target 
April 2022 Midlothian
Census information  
0
Percentage of people aged 65 and over
with long-term care needs receiving
personal care at home  (LGBF)
68.04
%
50.4% 52.54
%
53.6% 
Data for the LGBF 2021/22 will be available in Q3
2022/23
Page 80 of 96

Page 81

7
Customer Perspective - Community Safety 
2. Community Safety 
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
% of satisfactory complete Community
Payback Orders
67% 68% 61.8% 78% 73.4%   21/22: Off Target 
Satisfactory
completion is
affected by non
attendance of
offenders, and this is
outwith the control of
Council.  
80%
Percentage of all street light repairs
completed within 7 days (cumulative)
90.6% 100% 80.5% 94% 100%   21/22: On Target   88.5% 
Page 81 of 96

Page 82

8
Customer Perspective - GIRFEC 
3. Getting it Right for Every Midlothian Child 
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Number of outcome focused
assessments undertaken (cumulative)
1,006 1,241 1,478 1,045 1,339   21/22: Data Only 
Q1 - 299, Q2 - 268,
Q3 - 332, Q4 - 440   
Number of referrals to the duty service
(cumulative)
4,893 5,519 5,930 6,043 8,287   21/22: Data Only   
Number of foster carers going through
prep groups on a quarterly basis
(cumulative)
53 23 28 27 24   21/22: Data Only   
Number of new foster carers approved
(cumulative)
5 5 1 2 3   21/22: Data Only   
Number of foster carers de-registered
quarterly (cumulative)
3 4 2 5 5   21/22: Data Only   
Number of permanence LAAC 
Reviews happening quarterly
(cumulative)
16 37 29 23 10   21/22: Data Only   
Number of children matched in quarter
– (average months from perm LAAC to
matching panel) (cumulative)
12 6 7 2 8   21/22: Data Only   
Number of places taken at residential
houses - capacity 12
10 7 12 12 12   21/22: Data Only   
Page 82 of 96

Page 83

9
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
The number of children living in kinship
care
66 53 70 61 61   21/22: Data Only 
Not cumulative -
snapshot figure   
The number of children living in foster
care
86 63 68 65 65   21/22: Data Only 
Not cumulative -
snapshot figure   
Number of Midlothian children on the
Child Protection Register
36 51 53 36 38   21/22: Data Only 
Not cumulative -
snapshot figure   
Rate per 1,000 population of Midlothian
children on the Child Protection
Register in relation to the Scottish
average
2.2 3 3 2 2.1   21/22: Data Only 
Not cumulative -
snapshot figure   
% of Child Protection plans which have
integrated chronology
94% 96% 99% 93% 79%   21/22: Data only 
In Q4 79% of created
CP Plans had an
integrated
chronology.   
Rate per 1,000 of Midlothian Looked
After Children AT HOME in comparison
with the Scottish average
3.7 4.2 3.1 1.6 1.5   21/22: Data Only 
Not cumulative -
snapshot figure   
Rate per 1,000 of Midlothian Looked
After and Accommodated Children in
comparison with the Scottish average
9.4 7 7.9 7.3 7   21/22: Data Only 
Not cumulative -
snapshot figure   
The number of looked after children
and young people not in residential
placed outwith Midlothian
24 16 13 9 11   21/22: Data Only 
Not cumulative -
snapshot figure   
The number of looked after children
and young people placed in Residential
School outwith Midlothian
8 6 4 3 2   21/22: Data Only 
Not cumulative -
snapshot figure   
The number of young people who are
allocated/engage with Through Care
and After Care service
90 65 56 51 64   21/22: Data Only 
Not cumulative -
snapshot figure   
Child Protection: % of Core Group
meetings held within a 8 week period.
100% 99% 98% 100% 98%   21/22: Off Target 
3 core groups held
out with timescale  
100%
Child Protection: % of Core Group
meetings held within 15 days for Initial
93% 87% 79% 89% 86%   21/22: Off Target 
4 core groups held
out with time scale  
100%
Improve Primary School attendance 94.5% 94.86
%
94.04
%
95.06
%
92.25
%  
21/22: Off Target
COVID has
continued to be a
factor throughout the
21/22 School year.
95%
Improve Secondary School Attendance 89.4% 89.34
%
89.34
%
90.97
%
87.36
%  
21/22: Off Target
COVID has
continued to have a
negative impact on
education
attendance in
2021/22.
91.5%
Reduce exclusions in Primary schools
(Rate per 1,000)
74 94 8.44 6.16 3.04   21/22: On Target
There were 27
exclusions in
Midlothian Primary
schools to
31/03/2022
15
Reduce exclusions in Secondary
schools (Rate per 1,000)
299 210 14.8 13.7 20.2   21/22: On Target
There have been
114 exclusion
40
Page 83 of 96

Page 84

10
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
incidents in
Midlothian
Secondary Schools
to 31/03/2022.
Average primary school attendance 94.47
%
94.86
%
N/A 95.06
%
92.25
%  
21/22: Off Target
COVID has
continued to have a
negative impact on
education
attendance in
2021/22.
95%
Average secondary school attendance 89.39
%
89.34
%
N/A 90.97
%
87.36
%  
21/22: Off Target
COVID has
continued to have a
negative impact on
education
attendance in
2021/22.
91.5%
Number of Children looked after away
from home
181 N/A N/A 150 140   20/21: Data Only 
Not cumulative -
snapshot figure   
SEEMiS Exclusion data - Primary (2%
reduction) - Rate per 1,000
N/A 16.1 8.4 N/A 3.04   21/22: On Target 
There were 27
exclusions in
Midlothian Primary
schools to
31/03/2022  
15
SEEMiS Exclusion data - Secondary
(2% reduction) - Rate per 1,000
N/A 52.9 14.8 N/A 20.2   21/22: On Target 
There have been
114 exclusion
incidents in
Midlothian
Secondary Schools
to 31/03/2022.  
40
Percentage of Midlothian Care
Experienced school leavers
progressing to positive destinations
76.92
%
69.23
%
62.5% 92.31
%
80.95
%  
21/22: Off Target
Target for next year
set to the virtual
comparator score for
this year. Due to the
low number of pupils
involved this number
can vary greatly from
year to year.
82.43%
Annual percentage seen within 18
weeks for first treatment
48.8% 52.2% 74.5% 48% 56.8%   21/22: Off Target   90% 
Page 84 of 96

Page 85

11
Customer Perspective - Improving
Opportunities for Midlothian 
4. Improving Opportunities for Midlothian 
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Midlothian Citizen Advice Bureaux
(CABs) will generate an income
maximization of £625k per quarter
£3,704
,161
£3,352
,380
£4,401
,850
£3,055
,703
£5,703
,704  
21/22: On Target   £2,500,00
0
% of those leaving school secure a
positive destination
94.35
%
94.35
%
93.81
%
94.47
%
95.44
%  
21/22: On Target   95%
Number of Midlothian Active Choices
(MAC) attendees during quarter
(quarterly)
9,263 11,433 1,997 N/A 1,287   21/22: Data Only   
Number of activities offered by Ageing
Well to 50+ age groups (quarterly)
23 15 15 19 45   21/22: On Target   15
Tone zone retention rate (quarterly) 49.25
%
53.5% 55% 52% 74%   21/22: On Target   55%
Proportion of Pupils Entering Positive
Destinations  (LGBF)
94.91
%
93.81
%
94.47
%
95.44
% Data for the LGBF 2021/22 will be available in Q3 2022/23
Percentage of Unemployed People
Assisted into work from Council (LGBF)
6.71% 25.47
%
14.25
%
12.94
%
Page 85 of 96

Page 86

12
Customer Perspective - Sustainable Growth
and Housing 
5. Sustainable Growth
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Number of environmental awards e.g.
Green flags
5 2 2 1 1   21/22: On Target 
Green flag received
this year for the
Dalkeith to Penicuik
walkway.  
1
Percentage of Council fleet which is
'Green' (cumulative)
5.41% 5.34% 8.2% 8.4% 8.2%   21/22: On Target 
Figure has been
consistent at 8.2%
across the year. A
number of leases are
coming to an end with
little or no funding
available to extend
them and hence the
percentage will fall.  
8%
Percentage of waste going to landfill
per calendar year (quarterly)
40.9% 24.6% 11.5% 11.5% N/A   21/22: Data not
available for year
awaiting information
from our contractors,
returns into waste data
flow will be available at
Q1 2022/23.  
35.0%
Re-let time permanent properties
(calendar days)
50
days
49
days
54
days
46
days
46
days  
21/22: Off Target 
Average taken across
all quarters is 46 days
and although this is off
target for the year the
Q4 figure is 39 days, a
reduction of 13 days on
Q3.  
45 days
Percentage of the Councils housing
stock meeting the 'Modern facilities &
services' Scottish Housing Quality
Standard criteria
100% 100% 98.4% 98.4% 98.4%   21/22: Off Target 
98.4% of Midlothian
Council houses have
modern facilities and
services. Work to bring
the percentage of
Councils housing stock
that does not meets
100%
Page 86 of 96

Page 87

13
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Scottish Quality
Standards criteria has
been delayed due to
backlog created during
pandemic.  
Number of New Business Start Ups
(LGBF)
202 153 149 N/A 122   21/22: Data only 
In Q4 there were 38
new business start
ups. The total number
of start-ups for the year
21/22 represents an
annual increase of
65% in comparison to
previous year.   
Street Cleanliness Score  (LGBF) 95.98
%
91.3% 93.91
%
85.45
%
Data for the LGBF 2021/22 will be available in
Q3 2022/23
97.5%
Percentage of total household waste
that is recycled  (LGBF)
51.6% 58.2% 50.8% 47.3% N/A   21/22: Data not
available for Q4
awaiting information
from our contractors,
returns into waste data
flow will be available at
Q1 2022/23. Total for
calendar year 47.3%.
The recycling rate has
dropped as more
people WFH and more
waste was produced,
this has yet to recover.  
54.0%
Corporate Indicator - Percentage of the
Councils housing stock meeting the
Scottish Housing Quality Standard
criteria   (LGBF)
96.05
%
96.13
%
94.3% 98.12
%
34.3%   21/22: Off Target 
Due to changes in the
Energy Efficiency
regulations affecting
the SHQS criteria, 431
houses were identified
during Q3 as failing
EESSH. We have
reduced these failures
from 431 to 160 to
meet the 2025 targets.
However, with the
Electrical installation
condition reports
(EICR’s) now part of
the SHQS from the
31st March 2022 we
have found that 4733
fail assessment and
therefore we have
34.3% meeting
standard due to this. It
should be noted that
100% of smoke alarms
comply with current
legislation.  
100%
% of total road network resurfaced
(cumulative)
1.3% 1.67% 0.85% 0.54% 2.05%   21/22: On Target  
14.04km of
carriageway resurfaced
to end of Q4, including
Residential Streets
Programme
carriageways. Annual
target was increased
from 0.56% to 1.1% in
Q3 to include
1.1%
Page 87 of 96

Page 88

14
Performance Indicator 2017/
18
2018/
19
2019/
20
2020/
21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
additional resurfacing
works under the
Residential Streets
Programme. Target
bettered due to
underestimate of works
to be completed in Q4.   
Page 88 of 96

Page 89

15
Financial Health Perspective 
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Performance against revenue budget £202.
932m
£203.
596m
£206.
362m
£226.
262m
N/A   21/22: End of year
data is not available
yet. 
Corporate Indicator - Primary Education -
Cost per pupil  (LGBF)
£5,70
2.08
£5,96
3.39
£5,84
7.82
£5,84
8.92 
Data for the LGBF 2021/22 will be available in Q3
2022/23
Corporate Indicator - Secondary Education -
Cost per pupil (LGBF)
£7,73
0.13
£7,59
0.04
£7,52
0.16
£7,74
4.06
Corporate Indicator - Pre- Primary Education
- Cost per pupil (LGBF)
£4,78
3.59
£5,21
1.83
£7,64
1.14
£9,98
1.44
Corporate Indicator - The Gross Cost of
"Children Looked After" in Residential Based
Services per Child per Week  (LGBF)
£4,15
9.71
£3,92
8.03
£4,31
8.59
£6,71
4.50
Corporate Indicator - The Gross Cost of
"Children Looked After" in a Community
Setting per Child per Week  (LGBF)
£378.
31
£358.
80
£366.
50
£485.
61
Corporate Indicator - Central Support
services as a % of Total Gross expenditure
(LGBF)
4.45% 4.27% 4.09% 3.8%
Corporate Indicator - Cost of collecting
council tax per dwelling (LGBF)
£10.3
0
£7.89 £6.50 £6.13
Corporate Indicator - Percentage of invoices
sampled and paid within 30 days (LGBF)
93.1% 91.1% 89.6% 92.3% 93.1%   21/22: Off Target 
93.1% of invoices
were paid on time.
Work continues to
resolve barriers in
services to help
ensure all invoices
95.0%
Page 89 of 96

Page 90

16
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
are paid within the 30
days.  
Corporate Indicator - Net cost of waste
collection per premise (annual)   (LGBF)
£82.7
9
£74.5
4
£54.2
0
£69.3
3  
Data for the LGBF 2021/22 will be available in Q3
2022/23
Corporate Indicator - Net cost of waste
disposal per premise (annual)   (LGBF)
£94.6
6
£94.3
9
£57.8
4
£34.0
2
Corporate Indicator - Net cost of street
cleaning per 1,000 population   (LGBF)
£13,1
52.15
£13,1
54.33
£11,4
90.64
£13,6
66.13
Corporate Indicator - Cost of maintenance
per kilometre of roads  (LGBF)
£9,14
8.18
£12,7
59.99
£8,98
4.49
£7,36
5.86
Corporate Indicator - Cost of Trading
Standards, Money Advice & Citizen Advice
per 1000 population (LGBF)
£5,47
5.94
£5,26
1.73
£4,98
3.89
£6,19
4.31
Corporate Indicator - Cost of environmental
health per 1,000 population.  (LGBF)
£12,5
95.90
£9,25
5.86
£8,88
3.33
£8,74
9.33
Corporate Indicator - Older Persons Home
Care Costs per Hour (Over 65)  (LGBF)
£41.0
6
£38.1
2
£20.8
2
£25.4
5
Corporate Indicator - Self Directed Support
(Direct Payments + Managed Personalised
Budgets) spend on adults 18+ as a % of
total social work spend on adults
18+ (LGBF)
4.75% 4.49% 5.06% 4.31%
Corporate Indicator - The Net Cost of
Residential Care Services per Older Adult
(+65) per Week (LGBF)
£462.
20
£469.
47
£483.
83
£457.
19 
Page 90 of 96

Page 91

17
Learning and Growth Perspective 
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Percentage of employees who are
performing as 'Outstanding' in their
individual performance framework
6.7% 6.31% 7.01% 9.67% 9.2%   
21/22: Data only 
Figures reflect positon
at the end of April
however subject to
change in Q1 as all
MPM ratings are
complete.   
Percentage of employees who are
performing as 'High' in their individual
performance framework
25.55
%
26.79
%
20.27
%
24.18
%
22.81
%   
Percentage of employees who are
performing as 'Good Overall' in their
individual performance framework
39.9% 47.68
%
50.06
%
54.18
%
46.86
%   
Percentage of employees who are
performing as 'Below Standard' in their
individual performance framework with
appropriate improvement plans in place
0.59% 0.85% 0.25% 0.77% 0.25%   
Percentage of staff turnover (including
teachers)
10.3% 10.38
%
9.22% 5.9% 9.5%   21/22: Data only 
We track our
employee turnover
rates on a half yearly
basis by expressing it
as a percentage of
employees overall
when taking account
of all leavers. 
Turnover varies
through the year with
an expected increase
over the summer 
Page 91 of 96

Page 92

18
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
months. This reflects
teachers and other
school based staff
retiring or moving to
new roles at the start
of the new academic
year. Consideration of
the levels of turnover
across services,
locations and
particular groups of
employees helps to
inform workforce
planning and
resourcing. Aside
from 20/21 where
staff turnover was
5.9% the turnover
rate has been
consistent the last 3
years between 9-
10.5%.  
Employee Survey - I enjoy the work I do N/A 91.21
%
N/A N/A N/A   21/22: Data only 
Over the last 2 years
the employee annual
survey has been
postponed due to
Covid however we did
undertake a Covid
employee
engagement survey
during this time.   
Employee Survey - I am proud to work for
Midlothian Council
N/A 81.15
%
N/A N/A N/A   
Employee Survey - I can see how my
objectives link to the councils objectives and
priorities
N/A 75.39
%
N/A N/A N/A   
Progress against Council's mainstream
report (Equality and Diversity)
100% 100% 100% 100% 100%   21/22: On Target 
Annual Progress with
the Equality &
Diversity
Mainstreaming report
is on target.  
100%
Corporate Indicator - The Percentage of
council employees in top 5% of earners that
are women (LGBF)
49.0% 49.2% 51.0% 55.1% 55.0%   21/22: On Target  50.0%
Corporate Indicator - The gender pay gap
between average hourly rate of pay for male
and female - all council employees (LGBF)
2.32% 3.94% 3.06% 2.7% 2.52%   21/22: Data only 
The gender pay gap
measures the
average female pay
versus average male
pay within the
organisation. The
figures show that the
Council has more
male staff at higher
rates of pay by 2.52%
which shows a
continuous
improvement year on
year from 2018/19.   
Corporate Indicator - Sickness Absence
Days per Employee (All employees)
7.5 8.55 9.7 7.26 9.33   21/22: Data only 
Sickness absence
days have increased
compared to that of
last year. Up to end of
January 2021, Covid
related sickness
absence or otherwise
has been recorded as 
Page 92 of 96

Page 93

19
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
special leave and not
included in the
calculation of average
days lost. From 1st of
February to 7th of
July 2021 Covid
sickness absence
was being recorded
via the usual sickness
procedures with the
exception of special
leave granted for up
to 14 days for
isolation. As of July,
Covid absence is
being recorded as
special leave for up to
12 weeks and
recorded as sickness
absence thereafter.
There is no
identifiable trend
causing the increase,
either in short term or
long term absences.
However the changes
in recording covid
absence over the last
few years could be
attributable to the
increase in days lost.  
Corporate Indicator - Teachers Sickness
Absence Days (LGBF)
4.59
days
5.15
days
5.77
days
3.47
days
4.61
days  
21/22: Data only 
Sickness absence
levels have continued
to be a challenge this
year as we navigate
through the Covid
pandemic and as the
effects of longer term
Covid infections are
realised.   
Corporate Indicator - Local Government
Employees (except teachers) sickness
absence days (LGBF)
8.59
days
9.86
days
11.19
days
8.76
days
11.22
days  
21/22: Data only 
Sickness absence
levels have continued
to be a challenge this
year as we navigate
through the Covid
pandemic and as the
effects of longer term
Covid infections are
realised. It should be
noted that our
sickness absence
levels have remained
fairly static throughout
the pandemic
compared to previous
years even with the
added pressure of
Covid related
absences with 18/19
figures showing 9.86
days, 19/20, 11.22
days and 20/21, 8.76
days.   
Page 93 of 96

Page 94

20
Internal Processes Perspective 
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
Percentage of published LGBF indicators in
the top half of Scottish Council
N/A N/A 44.2% N/A Data for the LGBF 2021/22 will be available in Q3
2022/23
% of internal/external audit actions
progressing on target.
N/A N/A N/A 95.4% 91.7%   21/22: On Target 85%
% of high risks that have been reviewed in
the last quarter
N/A N/A N/A 100% 100%   21/22: On Target 100%
Corporate Indicator - Percentage of adults
satisfied with libraries  (LGBF)
66% 69.07
%
62.4% N/A 
Data for the LGBF 2021/22 will be available in Q3
2022/23
Corporate Indicator - Percentage of adults
satisfied with parks and open spaces 
(LGBF)
78.67
%
84.67
%
81.33
%
N/A
Corporate Indicator - Percentage of adults
satisfied with leisure facilities (LGBF)
74.33
%
70.87
%
63.2% N/A
Corporate Indicator - Percentage of Adults
satisfied with local schools (LGBF)
78.67
%
74.63
%
69.3% N/A
Corporate Indicator - Percentage of Adults
satisfied with refuse collection   (LGBF)
89.67
%
87.1% 83.1% N/A N/A   Satisfaction data is
not available for
inclusion in the
February publication
of the LGBF. The
publication of the
Scottish Household
Survey (SHS)
satisfaction data is
going to be later than
expected due to the 
Corporate Indicator - Percentage of adults
satisfied with street cleaning   (LGBF)
71.33
%
67.97
%
62.3% N/A N/A   
Page 94 of 96

Page 95

21
Short Name 2017
/18
2018
/19
2019
/20
2020
/21
2021/22 Annual
Target
2021/22 Value Value Value Value Value Status Short
Trend
Note
changed
methodology used in
2020. Methodological
changes introduced
some comparability
issues and there will
be further discussions
between the Board
and the SHS team
about how to usefully
incorporate this data
in the LGBF.  
Total number of complaints received
(quarterly)
N/A N/A N/A 7,337 6,450   21/22: Data Only  
Percentage of complaints at stage 1
complete within 5 working days
N/A N/A 87.61
%
91.32
%
87.7%   21/22: Off Target 
5,469 out of 6,236
complaints were
complete within 5
working days.  
95%
Percentage of complaints at stage 2
complete within 20 working days
N/A N/A 60.87
%
78.57
%
70.21
%  
21/22: Off Target 
33 out of 47
complaints were
complete within 20
working days.  
95% 
Page 95 of 96

Page 96

Page 96 of 96