Agenda Document Pack - Performance, Review and Scrutiny Committee - 14/03/2023

Midlothian Council · 14 March 2023
Back to Performance, Review and Scrutiny Committee — 14 March 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda 
Performance, Review and Scrutiny Committee 
Venue:  Council Chambers, 
Midlothian House, Dalkeith, EH22 1DN 
Date:  Tuesday, 14 March 2023 
Time:  11:00 
Executive Director : Place 
Contact:
Clerk Name: Democratic Services
Clerk Telephone:
Clerk Email: democratic.services@midlothian.gov.uk 
Further Information: 
This is a meeting which is open to members of the public.  
Privacy notice: Please note that this meeting may be recorded. The
recording may be publicly available following the meeting. If you would
like to know how Midlothian Council collects, uses and shares your
personal information, please visit our website: www.midlothian.gov.uk
Page 1 of 106

Page 2

1          Welcome, Introductions and Apologies   
2          Order of Business 
Including notice of new business submitted as urgent for consideration at the
end of the meeting. 
3          Declaration of Interest 
Members should declare any financial and non-financial interests they have in
the items of business for consideration, identifying the relevant agenda item and
the nature of their interest. 
4          Minute of Previous Meeting
4.1 Minute of the Performance Review and Scutiny Committee meeting
on 12 December 2022 submitted for Approval
3 - 8
4.2 Action Log 9 - 10 
5          Public Reports
5.1 Inspection of Midlothian Council’s Young People’s Care Home
Report by CSWO & Chief Officer Children’s Services, Partnerships
and Communities
11 - 22
5.2 Adult Health and Social Care Performance Report Quarter Three
2022/23
23 - 30
5.3 Children's Services, Partnership and Communities Performance
Report Quarter Three 2022/23
31 - 38
5.4 Corporate Solutions Performance Report Quarter Three 2022/23 39 - 56
5.5 Education Performance Report Quarter Three 2022/23 57 - 74
5.6 Place Performance Report Quarter Three 2022/23 75 - 98
5.7 Midlothian Council Report Quarter Three 2022/23 99 - 106 
6          Private Reports 
No items for discussion 
7          Date of Next Meeting 
The next meeting will be held on Tuesday 2 May 2023 at 11am 
Page 2 of 106

Page 3

1-1 
Minute of Meeting 
Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item No: 4.1 
Performance Review and Scrutiny 
Date Time Venue
Tuesday 12 December 2022 11.00 am Council Chambers,
Midlothian House 
Present:
Councillor Milligan (Chair)  Councillor Drummond
Councillor McCall Councillor McEwan
Councillor McManus Councillor Pottinger
Councillor Russell Councillor Winchester 
In attendance:
Kevin Anderson Executive Director Place
Fiona Robertson Executive Director Children, Young People and Partnerships
Derek Oliver  Chief Officer Place
Saty Kaur Chief Officer Corporate Solutions (Acting)
Nick Clater Head of Adult and Social Care Services
Janet Ritchie Democratic Services Officer
Andrew Henderson Democratic Services Officer 
Page 3 of 106

Page 4

1 Welcome, Introductions and Apologies 
Apologies for absence were received on behalf of Councillor Curran, Councillor
Smaill, Councillor Virgo and the Chief Executive. 
2 Order of Business 
The Order of Business was as detailed in the Agenda. 
3 Declarations of interest 
No declarations of interest were received. 
4 Minutes of Previous Meetings 
4.1 The Minute of the Meeting of the Performance Review and Scrutiny
Committee held on the 20 September was submitted and approved as
correct record. 
4.2 The Action Log of the meeting of Performance Review and Scrutiny
Committee held on the 20 September was submitted and noted. 
5.  Reports 
Agenda No. Report Title Presented by:
5.1 Inspection of Newbyres Village Care
Home 
Head of Adult and Social
Services
Outline of report and summary of discussion
A Report dated 9 November 2022 was submitted to provide an overview of the
recent unannounced Care Inspectorate visit for Newbyres Village Care Home.
The Head of Adult and Social Services highlighted the main sections contained
within the report in particular with regards to the inspection graded areas and the
key messages from the report.   He further advised that this was the 6th inspection
in the last two years and following a recent visit the Care Inspectorate advised that
they were pleased with the progress made and indicated they would be returning
either before or after the New Year.
Thereafter in response to questions and comments raised by Elected Members the
Adult Health and Social Care provided clarity on the expected ratings and that they
would expect sustained improvements with each report but highlighted some of the
challenges that may have an impact on that.  Reference was also made to agency
staff and changes in management and the Head of Adult Health and Social Care
advised they now had a sustainable management team with a new Service
Manager in place but he also confirmed that they do rely on agency staff and that
older people services overall struggle to retain permanent staff.  In responding to
another question he provided clarity on the system for dispensing of medication
and the reasons how errors occur, which can be due to the quality of recording,
different medication given at different times of the day and medication which is very
Page 4 of 106

Page 5

similar in name.  All these errors are taken very seriously and training and
procedures are put in place to ensure this does not continue to occur.
The Chair highlighted that in the past Inspection reports had a history of previous
inspections and this was useful for Elected Members to see any progress made
and asked that for future reports include this.
Decision
The Performance Review and Scrutiny Committee noted the report and agreed that
future Inspection Reports would include a history of any previous inspections.
Action
Joint Director Health and Social Care Partnership 
Agenda No. Report Title Presented by:
5.2 Adult Health and Social Care Q2
Performance Report  2022/23
Head of Adult and Social
Care Services
Outline of report and summary of discussion
The Head of Adult Health and Social Care provided an overview of the Q2
Performance Report 2022/23 highlighting the progress in the delivery of the
strategic outcomes and provided a summary of the emerging challenges as
contained within the report and thereafter responded to questions and comments
raised by Elected Members.  
The Head of Adult Health and Social Care confirmed that CAMHS is not delegated
to Health and Social Care therefore he could not provide accurate figures on the
waiting list but did comment that the waiting times remain relatively high.  With
regards to the number of people who have access to Buvidal, he advised that the
figures were small but he would confirm the numbers for Midlothian. He then
provided clarity regarding Mental Health beds and the systems in place to manage
this but with the pause in the primary care funding this was a concern, he also
highlighted some of the additional pressures on this service which is very
challenging.  He further provided some clarity on the OT targets which are set
internally and confirmed that the targets are moving in the right direction.   With
regards to a question regarding Naloxone training he advised on the number of
staff to be trained on this and that this would continue to be rolled out throughout
2023.  He also advised on the publicity and the different trends and he would
provide further details on this. 
Decision
a) The Head of Adult Health and Social Care Services to provide an update on
the number of people who have access to Buvidal in Midlothian.   
b) The Head of Adult Health and Social Care Services to include further details
on the publicity and the different trends in relation to drugs.
c) To otherwise note the contents of the report.
Action
The Head of Adult Health and Social Care Services
Page 5 of 106

Page 6

Agenda No. Report Title Presented by:
5.3 Children Services, Partnerships and
Communities Q2 Performance Report
2022/23
Executive Director
Children, Young People
and Partnerships
Outline of report and summary of discussion
The Executive Director Children, Young People and Partnerships provided an
overview of the Q2 Performance Report 2022/23 highlighting the progress in the
delivery of the strategic outcomes and provided a summary of the emerging
challenges as contained within the report and thereafter responded to questions
and comments raised by Elected Members.  
The Executive Director confirmed that the funding for the Mental Health Service for
Children and Young People was not postponed.  
Decision
To note the contents of the report. 
Agenda No. Report Title Presented by:
5.4 Corporate Solutions Q2 Performance
Report 2022/23
Chief Officer Corporate
Solutions (Acting)
Outline of report and summary of discussion
The Chief Officer Corporate Solutions (Acting) provided an overview of the Q2
Performance Report 2022/23 highlighting the progress in the delivery of the
strategic outcomes and provided a summary of the emerging challenges as
contained within the report and thereafter responded to questions and comments
raised by Elected Members.  
The Acting Chief Officer provided clarity on the phone staff in the Contact centre
and how the online services will assist in improving this service.    The Executive
Director Place in responding to a question regarding Scottish Welfare Fund and
Self Isolation Grants and the number of successful applicants provided an update
regarding the management of applications and confirmed that an analysis had
been carried out and details would be provided. In responding to a question from
Councillor Russell with regards to the success of the NHS ‘Near Me’ video, the
Acting Chief Officer advised that further information on the success and roll out of
this will be provided. 
Decision
a) The Executive Director Place to provide further details on the analysis
regarding Scottish Welfare Fund and Self Isolation Grants.
b) The Acting Chief Officer Corporate Solutions to provide further information
regarding the success and roll out of the NHS ‘Near Me’ video in Libraries.
c) To otherwise note the contents of the report.
Action
Acting Chief Officer Corporate Solutions/Executive Director Place 
Page 6 of 106

Page 7

Agenda No. Report Title Presented by:
5.5 Education Q2 Performance Report
2022/23
Executive Director
Children, Young People
and Partnerships
Outline of report and summary of discussion
The Executive Director Children, Young People and Partnerships advised that not
all Education performance measures were updated from Q1 to Q2 but the report
outlined the significant number of improvement actions that are being taken
forward in partnership with the schools and provided an overview of some of the
key priorities, progress and challenges for Q2.   
Thereafter in responding to a question raised with regards to Teachers negotiations
and contingency plans, the Executive Director advised that they are guided by
National decisions but on a local level they will continue to work closely with
Secondary Head Teachers to ensure young people have access to additional
support when required.  She further advised that the digital devices provided
allowed young people to access learning and highlighted that the Digital services
team had provided learning activities for children and young people to undertake
on the days of the strike action.
The Chair highlighted that the layout of this report was exceptionally difficult to read
and if possible could this be reviewed for future reports.
Decision
a) The Executive Director Children, Young People and Partnerships to review
the layout of the report for future reports.
b) To otherwise note the contents of the report.
Action
The Executive Director Children, Young People and Partnerships 
Agenda No. Report Title Presented by:
5.6 Place Q2 Performance Report 2022/23 Chief Officer Place
Outline of report and summary of discussion
The Chief Officer Place provided an overview of the Q2 Performance Report
2022/23 highlighting the progress in the delivery of the strategic outcomes and
provided a summary of the emerging challenges as contained within the report and
thereafter responded to questions and comments raised by Elected Members.  
With regards to the turnaround time on voids the Chief Officer advised that there
had been a month on month improvement and that a voids policy was in progress
and this would be reported to Council.  With regards to Volunteers, the Chief
Officer highlighted the importance of Volunteers and the work with the communities
and highlighted some of the advantages of working with volunteers and provided a
brief overview of how this is monitored and statistics obtained.
A comment was also noted on the difficulty to read some of the pages of the report
Page 7 of 106

Page 8

Decision
a) The Chief Officer Place to review the layout of the report for future reports.
b) To otherwise note the contents of the report.
Action
Chief Officer Place 
Agenda No. Report Title Presented by:
5.7 & 5.8 Midlothian Council Q2 Performance
Report 2022/23 and Half Year
Balanced Score Card
Executive Director Place
Outline of report and summary of discussion
The Midlothian Q2 Performance Report and the half year Balanced Score Card
was submitted.  The Executive Direct Place in presenting this report highlighted
that each of these reports provide a summary of actions in line with the Single
Midlothian Plan and complement each of the reports from the individual services
also presented today.  
Decision
To note the contents of the reports. 
6 Private Reports 
No items for discussion 
7 Date of the Next 
The next meeting will be held on Tuesday 14 March 2023 at 11.00 am 
The meeting terminated at 12.05 pm
Page 8 of 106

Page 9

Action Log 
Date of
Meeting
Item No Item Action Action Owner Expected
completion
date
Comments
20 Sept 2022 5.3 Corporate Solutions
Performance Report
Q1 22/23
Executive Director Place
to follow up on Cost of
Living crisis grant
cheques to ascertain
what measures are
being taken to identify
recipients.
Kevin
Anderson
01/11/2022 LACER update report
presented to Cost of Living
Task Force in December 2022 
Recommend for closure as
progress and update on
allocation is reported regularly
through Cost of Living Task
Force
12 Dec 2022 5.1 Inspection Reports History of previous
inspections to be
included in future
Inspection Reports.
All Ongoing  TO BE NOTED 
12 Dec 2022 5.2 Adult Health and
Social Care Q2
Performance Report
2022/23
Update to be provided to
Elected Members on the
number of people who
have access to Buvidal
in Midlothian
Nick Clater  Current people with access to
Buvidal in Midlothian at
present is 40 
Recommend for closure
12 Dec 2022 5.2 Adult Health and
Social Care Q2
Performance Report
2022/23
Further details to be
provided to Elected
Members on the publicity
and the different trends
in relation to Drugs
Nick Clater  The MELDAP website
(http://www.meldap-
recovery.co.uk/) provides a range
of publicity materials and
awareness raising. 
Performance Review and Scrutiny Committee 
Tuesday 14 March 2023 
Item No: 4.2 
Page 9 of 106

Page 10

Date of
Meeting
Item No Item Action Action Owner Expected
completion
date
Comments
12 Dec 2022 5.4 Corporate Solutions
Q2 Performance
Report 2022/23
Further details to be
provided to Elected
Members on the analysis
regarding Scottish Welfare
Fund and Self Isolation
Grants
Kevin
Anderson 
Further information provided
in the Q3 performance report
and will continue to provide
via quarterly reporting 
Recommend for closure
12 Dec 2022 5.4 Corporate Solutions
Q2 Performance
Report 2022/23
Further information to be
provided to Councillor
Russell on the success and
roll out of the NHS ‘Near
Me’ video in Libraries
Saty Kaur  Issued to Councillor Russell
January 2023 
Recommend for closure 
12 Dec 2022 5.5 Education Q2
Performance Report
2022/23 
Review layout of future
reports.
Fiona
Robertson 
Discussion held with cross party
group members regarding the
format of the
report and report layout will be
reviewed subject to further
discussion and feedback from
each political group. 
Recommend for Closure
12 Dec 2022 5.6 Place Q2
Performance Report
Review layout of future
reports
Derek Oliver   
Page 10 of 106

Page 11

Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.1 
Inspection of Midlothian Council’s Young People’s Care Home   
Report by Joan Tranent, CSWO & Chief Officer Children’s Services, Partnerships
and Communities 
Report for Information 
1 Recommendations 
Performance, Review and Scrutiny Committee are asked to note the findings of the
latest unannounced Care Inspectorate report which took place between 21 and 23
November 2022. 
2 Purpose of Report/Executive Summary 
The purpose of this report is to draw Performance, Review and Scrutiny’s attention in
relation to the inspection of our two local care homes for young people and the
grades awarded. All care inspection reports are published on the Care Inspectorate
website and available to the public.   
24 January 2023 
Report Contact:
Jo Foley  Tel No 0131 271 3792 
jo.foley@midlothian.gov.uk 
Page 11 of 106

Page 12

2 
3 Background 
3.1 The Care Inspectorate is responsible for inspecting care services throughout
Scotland. They do so using the Health and Social Care Standards. The headline
standards are: 
1: I experience high quality care and support that is right for me.
2: I am fully involved in all decisions about my care and support.
3: I have confidence in the people who support and care for me.
4: I have confidence in the organisation providing my care and support.
5: I experience a high quality environment if the organisation provides the premises. 
The inspection uses a descriptive statement and/or statements to evaluate how the
service meets the 5 higher-level standards. The final grade is then calculated using
an overall six-point scale ranging from unsatisfactory (1) to excellent (6). 
3.2 For the purposes of this unannounced inspection the descriptive statement used was
as follows:   
How well do we support children and young people's rights and
wellbeing   
3.3 The outcome of the Inspection was that the service was awarded an overall Grade
5, see below: 
How well do we support children and young
people's rights and wellbeing?
5 - Very Good
7.1 Children and young people are safe, feel loved
and get the most out of life
5 - Very Good
7.2 Leaders and staff have the capacity and
resources to meet and champion children and
young people's needs and rights
5 - Very Good 
The inspection determined that the overall practice was very good and that there was
ample evidence to suggest the young people were well cared for. During the verbal
feedback the inspector advised that the young people he spoke with felt ‘loved and
safe’. The following are some of the key messages: 
• Young People were experiencing positive outcomes.
• The service has a clear model of relationship based practice.
• Staff approached care in a trauma informed way.
• Both houses provided homely and welcoming environments.
• Management have a clear vision for service improvement. 
3.4 Although this was an unannounced inspection, the findings and positive verbal
feedback was a great result for a team who have worked hard to nurture and improve
the lives of the vulnerable young people they care for. The external inspection was
able to confirm qualities previously recognised by the Council during the pandemic.
In doings so, it endorses Midlothian’s overall value base that underpins our ethos in
caring for our most vulnerable children. 
Page 12 of 106

Page 13

4 Report Implications (Resource, Digital and Risk) 
4.1 Resource 
There are no risk implications. 
4.2 Digital 
There are no risk implications. 
4.3 Risk 
There are no risk implications. 
4.4 Ensuring Equalities 
The service mission is to care for looked after and accommodated children and
young people 
4.5 Additional Report Implications (See Appendix A) 
See Appendix A 
Appendices 
Appendix B – Care Inspectorate Report; Midlothian Residential Service for Young People
Care Home Service 
Page 13 of 106

Page 14

4
APPENDIX A – Report Implications 
A.1 Key Priorities within the Single Midlothian Plan 
The inspection feedback endorses our local approach to delivering services 
A.2 Key Drivers for Change 
Key drivers addressed in this report: 
Holistic Working 
Hub and Spoke 
Modern 
Sustainable 
Transformational 
Preventative 
Asset-based 
Continuous Improvement 
One size fits one 
None of the above 
A.3 Key Delivery Streams 
Key delivery streams addressed in this report: 
One Council Working with you, for you 
Preventative and Sustainable 
Efficient and Modern 
Innovative and Ambitious 
None of the above 
A.4 Delivering Best Value 
Our local care home for children and young people deliver best value which is
evidenced through this quality inspections and the cost of local services 
A.5 Involving Communities and Other Stakeholders 
Staff work with many stakeholders including young people and their families to
deliver holistic, sustainable services 
A.6 Impact on Performance and Outcomes 
Grade is above the current performance measure 
A.7 Adopting a Preventative Approach 
Not applicable 
A.8 Supporting Sustainable Development 
Not applicable 
Page 14 of 106

Page 15

MidlotMidlothian Rhian Residential Sesidential Serervice fvice for Yor Youngoung
PPeopeoplele
Care Home Service
23 Ladybrae
Gorebridge
EH23 4HT
Telephone: 01312 705 760
Type of inspection:
Unannounced
Completed on:
1 December 2022
Service provided by: Service provider number:
Midlothian Council SP2003002602
Service no:
CS2003011085
Page 15 of 106

Page 16

About the service
Midlothian Residential Services for Young People is a care home service for Children and Young People run
by Midlothian Council. The service has two locations, a house in Dalkeith which is a purpose built single
storey property and a two storey house in Gorebridge.
About the inspection
This was an unannounced inspection which took place between 21 and 23 November.
The inspection was carried out by one inspector from the Care Inspectorate. To prepare for the inspection we
reviewed information about this service. This included previous inspection findings, registration information,
information submitted by the service and intelligence gathered since the last inspection.
In making our evaluations of the service we spoke with nine people using the service and three of their
family. We spoke with 12 staff and management and spoke to four placing social worker. We observed
practice and daily life.
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 2 of 8
Page 16 of 106

Page 17

Key messages
• Young People were experiencing positive outcomes.
• The service had a clear model of relationship based practice.
• Staff approached care in a trauma informed way.
• Both houses were homely and welcoming environments.
• Management have a clear vision for service improvement.
From this inspection we evaluated this service as:
In evaluating quality, we use a six point scale where 1 is unsatisfactory and 6 is excellent
How well do we support children and young people's
rights and wellbeing? 5 - Very Good
Further details on the particular areas inspected are provided at the end of this report.
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 3 of 8
Page 17 of 106

Page 18

How well do we support children and young 5 - Very Good
people's rights and wellbeing?
We have graded this key question as very good where there are major strengths in supporting positive
outcomes for people.
Children and Young People in the service had positive relationships with a staff team who were committed
to a nurturing relationship based model of practice. Staff understood the needs of children and young
people in the service and recognised the impact of trauma and how this impacted on their behaviour.
Children and young people experienced improved outcomes and their wellbeing was promoted through
positive relationships with the staff team. The service had a clear ethos that this was a home for the
children and young people with staff providing a nurturing environment.
Children and young people generally felt safe and secure in the service and multi-agency risk management
plans were in place to manage risk where these were required. Staff were aware of their responsibilities in
relation to child protection and child sexual exploitation. Where incidents of bullying had occurred within the
service, staff were proactive in addressing this and undertook a restorative approach. The service should
continue to monitor the wellbeing of all children and young people in the service to ensure that bullying
does not have an adverse impact.
The service has a vision to eliminate restraint from it's practice and the use of restrictive practice in the
service was low. The service has taken on board feedback in relation to the risk assessment and
documentation in relation to incidents of restrictive practice when these take place to improve how practice
is analysed. Managers were provided with updated information on record keeping and notification and need
to ensure that this is followed.
Each house within the service had a homely feel and were welcoming environments that were generally well
maintained. Children and young people had the opportunity to personalise their rooms and both houses had
well maintained outdoor spaces. Some issues with décor were raised by staff during the inspection and it
was noted that a number of improvements are planned.
Children and young people were aware of their rights to continuing care and had access to formal advocacy.
Children and young people were engaged in their care planning through the use of key time. Mechanisms
were in place to gather their views through house meetings and a "you said we did" suggestions box.
Children and Young People were supported to maintain positive mental health through encouragement of
individualised strategies that helped them to regulate their emotions. Staff had good knowledge of what
worked for each individual child or young person.
Children and Young people were supported to maintain links with birth family. Staff actively promoted family
time through the provision of transport and family were supported to visit children and young people in the
service if this was in their interest. Some parents reported that communication with the service could be
improved.
Children and young people's individual ambitions, interests and skills were consistently supported and
developed. Staff supported children and young people to engage in a range of community activities such as
local youth clubs, swimming, fishing, horse riding, trampolining and attending sports events.
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 4 of 8
Page 18 of 106

Page 19

Children's attendance at school was a major strength of the service and a number of young people who had
poor attendance or a limited timetable had been able to increase their hours education. The service had
high aspirations for young people and promoted positive attainment and there were examples of young
people engaging in college and apprenticeships.
Healthy eating and exercise were promoted with staff prepared two menu options for young people each
day to promote positive choices. Food prepared was cooked fresh and provided a balanced diet. Mealtimes
were nurturing occasions where staff shared food with children and young people.
Leaders ensured a positive culture and staff were very positive about the vision of the registered manager.
Management had a clear vision for improvement, a comprehensive development plans was in place and the
manager had undertaken self evaluation to identify improvements linked to "The Promise" arising from the
Independent Care Review and the incorporation of the United Nations Convention on rights of the child in to
Scottish law.
Children and young people generally felt there was the correct number of staff in the service. A change in
shift pattern meant that night shift staff started earlier. This led to improved relationships in the service as
night staff had an opportunity to engage children and young people in activities at the start of their shift.
Staff had access to reflective and supportive supervision to support them in their role. Some staff reported
that supervision did not take place at the required frequency or could be cancelled at short notice. The
service should ensure that all staff have access to regular supervision and that this is prioritised within the
service.
Children and young people had positive risk management plans within the service that outlined needs and
risks and how they should be cared for but these did not fully reflect the depth of knowledge held by staff.
These plans could more clearly outline strategies for support and better promote SMART (Specific,
Measurable, Realistic, Timebound) care planning linking key time to specific objectives. This is recognised
within the service improvement plan as an area for further development.
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 5 of 8
Page 19 of 106

Page 20

Areas for improvement
Previous area for improvement 1
To ensure young people are protected from harm the service must improve its assessment and management
of risk.
This area for improvement was made on 14 June 2019.
Action taken since then
Assessment and risk management plans updated since previous inspection.
Previous area for improvement 2
To ensure young people experience consistent care and support as they get older the provider should review
their approach to continuing care, promoting a shared understanding.
This area for improvement was made on 14 June 2019.
Action taken since then
Clear policy for Continuing Care in place that includes residential care in Midlothian.
Complaints
There have been no complaints upheld since the last inspection. Details of any older upheld complaints are
published at www.careinspectorate.com.
Detailed evaluations
How well do we support children and young people's rights and
wellbeing? 5 - Very Good
7.1 Children and young people are safe, feel loved and get the most out of
life 5 - Very Good
What the service has done to meet any areas for improvement we
made at or since the last inspection
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 6 of 8
Page 20 of 106

Page 21

7.2 Leaders and staff have the capacity and resources to meet and
champion children and young people's needs and rights 5 - Very Good
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 7 of 8
Page 21 of 106

Page 22

To find out more
This inspection report is published by the Care Inspectorate. You can download this report and others from
our website.
Care services in Scotland cannot operate unless they are registered with the Care Inspectorate. We inspect,
award grades and help services to improve. We also investigate complaints about care services and can take
action when things aren't good enough.
Please get in touch with us if you would like more information or have any concerns about a care service.
You can also read more about our work online at www.careinspectorate.com
Contact us
Care Inspectorate
Compass House
11 Riverside Drive
Dundee
DD1 4NY
enquiries@careinspectorate.com
0345 600 9527
Find us on Facebook
Twitter: @careinspect
Other languages and formats
This report is available in other languages and formats on request.
Tha am foillseachadh seo ri fhaighinn ann an cruthannan is cànain eile ma nithear iarrtas.
Inspection rInspection reporteport
Inspection report for Midlothian Residential Service for Young People
page 8 of 8
Page 22 of 106

Page 23

Adult Health and Social Care Performance Report
Quarter Three 2022/23 
Progress in delivery of strategic outcomes
Our Vision: People in Midlothian are enabled to lead longer and healthier lives.
Our Values: Right support, right time, right place.
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes
all community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency.
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new Strategic Plan for 2022-
25 was published in April 2022.
HSCP COVID-19 Response
The Health and Social Care Partnership, its partners and the communities it services continued to be impacted by
the ongoing effects of the COVID19 pandemic. A recent spike in infections over the winter months coupled with
Influenza A cases has caused significant pressure on our workforce due to absences. The Health and Social Care
Partnership has maintained delivery of services and continues to work with its partners to ensure resources are
being managed and deployed to cover staff absences where needed.
Seasonal Flu/COVID Booster Programmes
The Midlothian Vaccination Team have responsibility for all vaccinations; Seasonal Flu, all covid vaccines, shingles
and pneumococcal and all unscheduled vaccines that were part of the Vaccination Transformation Programme from
the GPs to the HSCP.
In accordance with JCVI guidance, the Autumn/Winter vaccination programme for Flu and covid booster continues
until 31st March 2023. All eligible cohorts have received and been invited for their vaccinations across 4 venues –
Midlothian Community Hospital, Rosewell Steading, Gorebridge Leisure Centre and Penicuik YMCA-YWCA. From
December, clinics were opened to drop-in clinics to increase and promote uptake. Penicuik YMCA-YWCA closed on
22 December 2022 with the other venues remaining open.
As of 08 January 2023, the uptake of flu vaccines for adults administered in Midlothian HSCP is 67% and 68% for
Covid booster vaccines.
The Community Vaccination Team continues to deliver the school flu programme and the 0-5 immunisation team
deliver the 2-5 year flu programme with a 59% uptake.
The housebound, inpatient and care home vaccination programmes are successfully complete with ongoing mop-
ups arranged.
As part of the inclusivity plan and to promote further uptake in line with the Sottish Government target of 80%
uptake. Pop clinics took place at IKEA Edinburgh, Mayfield Community Big Dig event, separate clinic sessions were
held inviting individuals in homeless accommodation and Learning Disabilities teams continue to support with
vaccinating their patient who are unable to attend clinics. There is further work planned for Q4 in line with the
inclusivity plan.
Service Transformation
On 20 June 2022 the Scottish Parliament published the National Care Service Bill which will provide the foundation
for the NCS. Alongside the Bill, explanatory notes, a policy memorandum, a financial memorandum and a delegated
Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.2
Page 23 of 106

Page 24

powers memorandum were also published. The first stage of the consultation was concluded in early September and
we await the outcome of that. It should be noted that both COSLA and Social Work Scotland have requested that the
Scottish Government pause on the Bill pending further consultation.
Justice
The Justice Team have continued to deliver a range of interventions that fulfil all statutory requirements, despite
managing a number of vacancies across quarter 2 and 3. We continue to ensure that we meet the needs of those
released from custody either on remand or as planned release at sentence end date. There are strong links with
SPS, and HMP Edinburgh in particular, which allows for work to be undertaken as part of the Number 11 allocations
meetings to ensure that those leaving custody have access to support and resources relevant to their risk and
needs.
Substance Misuse
Key services based in Number 11 in Dalkeith continued to provide services including outreach treatment, injecting
equipment provision [IEP], naloxone, and information/advice. Currently, there are challenges with recruitment.
However, the Midlothian Substance Use Service continues to support and treat those individuals who are most at
risk. This includes the provision of Buvidal [an injectable form of Buprenorphine].
Learning Disabilities
The Complex Care Expert Panel Group oversees the spending of Midlothian’s Complex Care Community Fund has
now met three times and completed a plan for the Midlothian allocation of Community Change Fund. This includes
allocations for third sector organisations, the development of a Safe House, improvements in transition for young
people moving into adult life, refurbishment of community premises and a programme of training.
The Human Rights Expert Panel has been meeting every six weeks, with well attended sessions covering Human
Rights and The Charter for Involvement. Two more sessions on Recovery from the pandemic and Communication
will be held in January 2023.
The flats at Bonnyrigg High Street are scheduled for completion early 2024. Designs for Primrose Lodge in
Loanhead are complete, but the property is being used to house tenants of Teviot Court whilst their flats are being
upgraded. The first six tenants moved on 4th and 5th October and have now returned to their renovated flats at
Teviot Court. The second group are currently living at Primrose Lodge and will return to their tenancies in February.
The entire programme of work at Teviot should be completed by March/April 2023, but outside works are weather
dependent. We are now reapplying for capital funding for the work at Primrose Lodge.
Waiting times for Social Work and Occupational Therapy services remain off target - this is largely due to staff
vacancies, demand, acuity and some sickness absence.
Older People
Extra Care housing: Workforce paperwork is underway with care inspectorate around registration application for
ECH care staffing for Normandy Court Dalkeith. The staffing structure has been approved by HSCP and we will
move to recruitment in the next quarter. A change in handover date has been advised which will now be
approximately May 2023.
Care at home: our internal and external providers delivered 59,544 actual care hours during this time period across
Midlothian. Internally, the Homecare team delivered approximately 35% of all care hours for Older People, and a
total of 61,272 visits to individuals. There continues to be a rise in demand for individuals being discharged from
hospital and more work is underway regarding pathways for emergency community package of care requests to
avoid admission where possible. A Multi-agency Quality in Care at Home has been re-established jointly with East
Lothian to review quality and sustainability of Care at Home providers in the area. The internal Home Care service is
also focused on the Learning and Development opportunities for our workforce. As part of these efforts, a series of
face-to-face Infection Control training was rolled out to all teams.
Carers
Work currently in progress to produce a business case and plan committing available recurring and underspent
Carers act funding, submitting to SMT in January 2023. Q3 has seen consultation with staff, carers and stakeholders
confirming existing priorities within the Midlothian Carers Strategy (agreed prior to pandemic) remain relevant,
sharing of consultation findings, and invitation to submit proposals for work to support use of the available funds
through: strengthening of services and gaps; utilisation of underspent and carried forwards carer act funding. Closing
Page 24 of 106

Page 25

date for proposal submissions 21/12/22. Proposals will be shared with stakeholders for feedback, to be returned
mid-January.
There is delay in the recruitment to the Alzheimer Scotland Dementia Carer Support Practitioner post. Meeting with
the provider due 21/12/22 to agree a way forward. Carer Strategy and IIA have been signed off and published on the
Midlothian Council website.
Mental Health
Primary Care 2022 Action 15 developments continues to be postponed still awaiting update from Scottish
Government.
Individual Placement Support has been impacted on due to recruitment we were hopefully we had a candidate
however they have withdrawn and now the post is out to advert and there is interest, so we are hopeful to recruit.
Strong partnership working continues between Housing, Health and Social care with third sector. Providing support
for individuals with complex needs, through the housing first model.
Adults with Long Term Conditions, Disability and Impairment
Awareness training sessions for HSCP staff, provided by Sight Scotland are being planned for the New Year. Sight
Scotland continue to provide information sessions to staff in relation to the services they provide and report back on
the people they have worked with. They continue to reduce waiting lists for people requiring their service, which is
offered in their community and evidence this through quarterly reporting.
Meetings have been taking place with Deaf Action to review their role and how they support our Services in light of
them not having any access to a BSL trained Social Worker from the New Year. They have been asked to provide
an up to date list of all the people within Midlothian that they work with. The still have a CCA who is able to provide
support using BSL.
Volunteers continue to uplift peoples’ faulty hearing aids from their homes and deliver the aids to Midlothian
Community Hospital for an Audiology technician to repair, and then return the repaired aids back to the individuals.
Specially trained staff are also able to repair hearing aids for people on the same day. This service is offered both by
HSCP and Redcross staff. Recent conversations with the volunteer coordinator have improved communication and
efficiency around volunteer collection service. A meeting took place to discuss the re-instigation of community based
hearing aid repair clinics which took place before Covid. It was agreed by HSCP staff and Third Sector agencies that
there was a benefit in these starting again as they not only provide a practical purpose but reduce social isolation
and provide peer support for people who attend. Actions have stalled as a result of not having been able to engage
Audiology in these plans so far
Hybrid model up and running for delivery of face to face and digital for all weight management programmes. Digital
devices secured for people referred so they are able to decide what options best suits their needs Improving
Sport and Leisure
Gorebridge Leisure Centre: Roof replacement now complete, some remedial work to be completed in the gym but
not affecting business operations. The centre is being utilised for the winter vaccination programme on a smaller
scale than previously with only the lesser hall being used.
Meeting between all contractors and Midlothian took place in December with regards to destination Hillend which will
see work commence on Monday 30th January 2023. Initial phase with see major improvements to access roads as
well as the A702.
The Gym Group opened one of its budget gym facilities at Straiton retail park in November. Membership numbers
have dropped but we can't tell at this time if this is due to solely down to The Gym Group, general cost of living
factors or seasonal drop-off but we are monitoring the situation closely.
Active Schools:-
Free Activity
Our move to free activity has gone well. Rather than taking a one size fits all approach, we have worked with schools
& communities to identify what model works best for each school and we have nearly all schools engaging. We are
currently completing our monitoring for term 1 and will update once data is confirmed. However approximate data is:
. 102 free primary clubs.
. 50 free secondary clubs.
Page 25 of 106

Page 26

. 108 volunteers delivering activity equalling 994.5 hours of volunteering in Q3
. 1960 pupils participating.
This is a really positive start to our free activity programme and we hope to see these numbers increasing each term
as we settle into the new model.
Events
We have welcomed back our in person events this term and the feedback from schools has been really positive. We
have had the following events this term;
Event No. of schools Approximate no. of pupils
Basketball 16 170
Hockey 3 80
Boccia 5 40
Netball (secondary) 2 50
We are looking forward to starting term 2 with our Sportshall Athletics events with 21 schools attending.
Secondary Schools Term 1/Term 2
. Active Schools Leadership Academy – 12 pupils have completed a programme of training and will now deliver free
clubs in primaries, high school & community settings.
. Introduction to Coaching Children – We have delivered this training to Sports Development & Sport & Recreation
classes at Beeslack and Newbattle. We plan to have some of these pupils delivering activity in primaries and
community settings.
. Fit for Girls – We have recruited more girls from secondary schools onto our Midlothian Fit for Girls Committee and
they will receive training from the national tutors in January. We ran this programme successfully last year and as
part of Women & Girls in Sport Week, Maree Todd, Minister for Public Health, Women’s Health & Sport visited
Midlothian to hear about our work from the girls who were involved.
. Kit for All – We are rolling out the Kit for All programme across Midlothian schools and communities, recycling &
redistributing sports kit. 
Challenges and Risks
COVID-19
The Health and Social Care Partnership, its partners and the communities it serves continued to be impacted by the
COVID 19 pandemic. The Health and Social Care Partnership has maintained delivery of services and continues to
work with its partners to ensure resources are being managed and deployed to cover staff absences where needed
and continue to develop our remobilisation plans. We continue to work to ensure key staff receive both the Covid
and flu vaccine.
A growing and ageing population
Midlothian is the second smallest Local Authority in mainland Scotland but the fastest growing. This will continue to
pose challenges for health and social care services whilst also changing some local communities. As people live for
longer many more people will be living at home with frailty and/or dementia and/or multiple health conditions. An
increasing number of people live on their own, and for some this will bring a risk of isolation.
Higher rates of long-term conditions
Managing long-term conditions is one of the biggest challenges facing health care services worldwide, with 60% of
all deaths attributable to them. Older people are more susceptible to developing long-term conditions; most over 65s
have two or more conditions and most over 75s have three or more conditions. People living in areas of multiple
deprivation are at particular risk with, for example, a much greater likelihood of early death from heart failure. They
are also likely to develop 2 or more conditions 10-15 years earlier than people living in affluent areas.
Higher rates of mental health needs
Many mental health problems are preventable, and almost all are treatable, so people can either fully recover or
manage their conditions successfully and live fulfilling healthy lives as far as possible. The incidence of mental
health issues in Midlothian, while similar to the rest of Scotland, is a concern. Living in poverty increases the
likelihood of mental health problems but also mental health problems can lead to greater social exclusion and higher
levels of poverty. People who have life-long mental illness are likely to die 15-20 years prematurely because of
physical ill-health.
Page 26 of 106

Page 27

Our services are under pressure
People place a high value on being able to access effective health services when they need them. People expect to
receive high quality care services when these are needed whether as a result of age, disability, sex, gender or long
term health conditions. Yet there are a number of pressures on our services.
Financial pressures
Financial pressures on public services are well documented. There is no doubt that we need to do things differently:
the traditional approach to delivering health and care services is no longer financially sustainable. We have particular
pressures in our disability services with challenges to meet complex needs in the community when in the past care
settings may have been considered.
Workforce pressures
The Covid-19 pandemic has and will continue to influence the demand for, and deployment of, the health and care
workforce for the foreseeable future. There is reduced availability of staff with appropriate qualifications or skills,
including General Practitioners, Social Care Workers and Staff Nurses. This impacts on service delivery and
development.
Unpaid carers
Unpaid carers fulfil significant, valuable and wide-ranging roles within Midlothian communities, helping to keep
people with care and support needs within our communities. During the pandemic many people became carers for
the first time, or saw changes to their caring role, resulting in them providing significantly more care for their elderly,
sick or disabled family, friends and neighbours. Through this period services supporting carers continued to offer a
range of support, including digitally, and by telephone, though services supporting the person they provide support to
may have been reduced, e.g. respite and day services, impacting on carers. Further work is required to reduce the
significant pressure and impact of caring that carers reported, by continuing to explore innovative options to enable
support to be given to both carers and the cared-for, and for there to be opportunities for breaks from caring. We are
currently working with key stakeholders to determine how best to allocate the resources we have for unpaid carers.
Acute hospitals
Acute hospitals are under huge pressure due to unsustainable demand and financial restrictions. Investing in
community based services and work with carers is required to minimise avoidable and inappropriate admissions and
facilitate earlier discharge. By treating people closer to home, or in their own home the HSCP can support admission
avoidance and improve people’s outcomes. 
Page 27 of 106

Page 28

Page 28 of 106

Page 29

Page 29 of 106

Page 30

Page 30 of 106

Page 31

Children's Services, Partnership and Communities
Performance Report Quarter Three 2022/23
01. Progress in delivery of strategic outcomes
Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.3
Page 31 of 106

Page 32

01. Progress in delivery of strategic outcomes
GIRFEC Service Priority: More children and young people are safe, healthy and resilient
Priority Action 1: Develop a Midlothian Whole Family Support Service
Progress and Achievement in Q3
• All staffing in place and due to start 16th January 2023
Plans for improvement next Quarter and year ahead
• Referrals will be received into service from end January 2023
• Continue to strengthen working relationships with third sector and other partner agencies and ensure
there is no duplication of services.  Event organised for February with 3rd sector to ensure a
collaborative approach in taking this service forward
• Communications strategy with partners and service users to continue to be rolled out
• Strategy paper and plan regards evaluation will also be progressed
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Funding and resources
are in place for 23/24 31/03/23 New Measure 0 12 staff
recruited
All staff in
place
Priority Action 2: Increase the number of families who benefit from Family Systemic work
Progress and Achievement in Q3
• First annual evaluation report completed
• At the end of Q3 a total of 29 families were engaged in Family Systemic work
Plans for improvement next Quarter and year ahead
• Continue to evaluate the impact of systemic family work in Midlothian
• Deliver two NVR coaching groups for workers across Children’s Services
• Facilitate further awareness raising workshops in 2023
Performance
Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
17 new families 31/03/23 17 12 4 5 29
Priority Action 3: Promote the use of Self-Directed Support (SDS) amongst families using services
Progress and Achievement in Q3
• 46% increase in the number of families who organise their own support
• Review of resources and how these are accessed by service users with varying levels of need
• Continue to review current assessment processes
• Linked to a wider disability review
Plans for improvement next Quarter and year ahead
• Guidance continues to be updated and refresher training across the service will follow.
• Section 23/disability practice standards will be developed
• Emphasis on effective transitions
• Identify and progress opportunities to expand holiday provision and respite options locally for children
with complex additional needs
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Increase by 10% the
number of families who
organise their own support
31/03/23 75 68 46 67
Page 32 of 106

Page 33

Priority Action 4: Further develop the supports offered to Family Group Decision Making and Kinship
supports
Progress and Achievement in Q3
• Continued to expand the number of families engaged with the Family Group Decision Making service
• Link established between Family Wellbeing and statutory service
• Kinship engagement meetings have been re-established
Plans for improvement next Quarter and year ahead
• Continue to expand on progress made in Q3 in relation to the number of Families engaging with the
Family Group Decision Making Service
• Strengthen relationship with Kinship carers in Midlothian
• Increase awareness of supports available to kinship carers
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Number of families who are
referred to Family Group
Decision Making
31/03/23 increase 21/22
figs by 15% 79 32 59
Number of families who
participate in Family Group
Decision Making
31/03/23 Increase 21/22
figs by 10% 32 16 24
The number of assessments
by kinship worker 31/03/23 increase 21/22
fig by 15% 14 4 6
Percentage of kinship carers
who attend engagement
sessions 
31/03/23 80% of Kinship
carers one event New Measure 0
0
Reduce the number of
CEYP who enter homeless
accommodation vs other
suitable accommodation
31/03/23 2
Data
available
March 2023
Data
available
March 2023
Number of CEYP living with
Foster Carers on After Care
arrangement post 21 years
31/03/23 3 New Measure
Data
available
March 2023
Data
available
March 2023
Increase number of young
people in the National
Housing Project
31/03/23 10-12 New Measure
Data
available
March 2023
Data
available
March 2023
Average age of young
people in Continuing Care 31/03/23 Age 18 New  Measure Data
available
March 2023
Data
available
March 2023
Priority Action 5: Develop a pathway for children and families to navigate mental health services
Progress and Achievement in Q3
• CYP mental health strategic planning group has continued to meet
Plans for improvement next Quarter and year ahead
• New chair of CYP mental health strategic planning Group Single to be identified
• Single point of Access to be developed. This is a significant but important piece of work that has been
delayed due to staff shortages and capacity issues.
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
1 x Single Point of Access in
place (SPOA) 31/03/23 New
Measure 0 N/A N/A
Page 33 of 106

Page 34

Priority Action 6: Strengthen mechanisms to support families maximise their income
Progress and Achievement in Q3
• 67% Increase in number of Families being offered an income assessment
• CAB have successfully recruited into the Early Intervention Income Maximisation post. Worker due to
start January 2023
Plans for improvement next Quarter and year ahead
• Development sessions will be undertaken across the service to upskill workers on income
maximisation support
• Financial assistance worker to be recruited to respond to financial assistance requests coming into
Duty service
• Income maximisation worker to be recruited to sit within Family Wellbeing Service
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Number of  families offered an
income assessment 31/03/23 90 60 27 45
Priority Action 7: Children, young people and their families experience high quality services
Progress and Achievement in Q3
• An unannounced inspection of our two residential houses took place in December 2022. The service
was evaluated as Very Good with the inspectors citing the following key strengths:
- Young People were experiencing positive outcomes.
- The service had a clear model of relationship based practice.
- Staff approached care in a trauma informed way.
- Both houses were homely and welcoming environments.
- Management have a clear vision for service improvement.
Plans for improvement next Quarter and year ahead
• Improvement plans in place
Performance Indicator
Due
Date Target
Baseline
(previous data) Q1 Q2 Q3
Local Adoption Service will
provide high quality care and
support
31/03/23
Care inspection
Grading of
GOOD
New Measure
Data
available
March 2023
Data
available
March 2023
Local Fostering Service will
provide high quality care and
support
31/03/23
Care inspection
Grading of
GOOD
New Measure
Data
available
March 2023
Data
available
March 2023
Local Continuing Care/Adult
services will provide high
quality care and support
31/03/23
Care inspection
Grading of
GOOD
New Measure
Data
available
March 2023
Data
available
March 2023
Hawthorn Family Learning
Centre will provide high quality
care and support 31/03/22
Care inspection
Grading of
GOOD
New Measure
Data
available
March 2023
Data
available
March 2023
Young People’s Care Homes
will provide high quality care
and support
31/03/22
Care inspection
Grading of
GOOD
New Measure
Data
available
March 2023
VERY
GOOD
Priority Action 8: Children and young people are supported to develop a strong sense of their own
identity
Progress and Achievement in Q3
• Life Story Work training took place in October 2022.12 workers from across Children’s Services
attended
• 3 staff undertaking formal life story training with a view to increasing capacity within the service
Plans for improvement next Quarter and year ahead
• Further training to be delivered in 2023
Page 34 of 106

Page 35

Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Staff are trained and
understand Life Story work 31/03/23 20 16 N/A at this
time
12
Priority Action 9: Children and young people are supported by staff who understand the importance of
trauma informed practice
Progress and Achievement in Q3
• Recruitment of trauma Informed Practice worker
• Educational Psychologist also  working with staff and carers to increase capacity within LAAC
workforce
Plans for improvement next Quarter and year
ahead
• New worker will develop a work plan
Performance Indicator Due Date Target
Baseline
(previous data) Q1 Q2 Q3
Staff are trained in using a 
trauma informed approach 31/03/23 20 15 N/A at this
time
N/A at
this time
Page 35 of 106

Page 36

02. Challenges and Risks
National Care Service:  The ‘Bill’ which is currently in Stage 1 of the process is currently being considered with an
expectation that the lead committee will provide a report on the Bill at the start of 2023.  CELCIS have been
commissioned to undertake research around the inclusion of children’s services within the NCS.  This work should
be concluded by August 2023. No further updates have been received for Q3, however this is still very much a
challenge for social work going forward.
The Promise
The Promise lead has now commenced in post and will progress Midlothian’s Promise Strategy and plan. A
challenge in progressing this work will be to engage with all partner agencies to ensure shared responsibilities as
corporate parents. A series of Promise engagement/awareness raising will be rolled out across the Council and
Partnership and will include Elected members.
Children’s Services Referrals
There remains a significant increase in referrals into Children’s Services. Over quarter 3, referrals have risen to
6390, an increase of 7% from the same period last year.
Poverty
As families continue to be impacted by the cost of living crisis this is expected to lead to an increase in the number of
families experiencing poverty. This also applies to workers on low incomes.
Workforce:
Midlothian continues to experience the same staffing issues encountered by other Councils. There is a general lack
of experienced and skilled staff across the sector and we are having to increasingly rely on locum workers.
Whilst not the only factor, the issue is exacerbated by our salaries not being as competitive as neighbouring local
authorities. Furthermore, there is a view that many workers are leaving the profession due to increasing demands
being placed on the social work role. We recognise that this is something that professional bodies are tackling
nationally
Arrival of Ukrainian Families and Unaccompanied Asylum Seeking Children
We continue to welcome Ukrainian families into Midlothian adopting a holistic approach to the support on offer.  We
are confident that our steady and thorough approach to this work has ensured that we are robust in the work we are
undertaking.
We also continue to ensure that we meet the agreed quota of unaccompanied children seeking asylum in Midlothian,
arriving from other parts of the world as well as planning and welcoming families fleeing from Afghanistan.
To date we have 123 Ukrainian people (27 families with children) living in Midlothian.  We have 21 Afghanistan
people which equates to 3 families with children.
Until recently we had 3 young people under the age of 18 who are unaccompanied asylum seeking and 10 young
people over the age of 18, most of whom have been here for several years. We recently accommodated a young
Afghanistan child who, worker believe is our youngest child yet – he is being looked after by carers.
Children with and Enduring Complex Needs
We continue to work with partners to explore how best to meet the current demands and pressure whilst making
sure we future proof our services to deliver sustainable options locally for children and young people with ASN and
Complex and Enduring Needs. This includes consideration of residential care home provision.
Foster Care
We continue to seek and explore options to expand our foster carer population recognising the need to future proof
this area of service. We are looking at new campaigns to promote recruitment of foster carers for both local children
and young people but also to consider caring for unaccompanied asylum seeking children and young people.
Kinship Care
Our desire in Midlothian is to increase our current kinship service. We have a dedicated kinship worker at this time.
Instrumental Music Service
Providing free tuition to all pupils whilst having to meet a significant savings agreed within the Medium Term
Financial Strategy will be challenging. We are undertaking an option appraisal which shall consider how we best
Page 36 of 106

Page 37

deliver and design a service that is modern, implementing the learning during the pandemic, whilst also delivering a
service that is equitable and sustainable given the current budget position.
Financial Pressures
- There is a financial challenge to deliver statutory services given the current budget gap.
- Due to the current financial climate there may be an impact on services as a result of the cost of living and increase
in poverty.
Page 37 of 106

Page 38

Page 38 of 106

Page 39

Quarter 3 (October - December 2022) was a challenging quarter for Corporate Solutions as it continues to
support post-pandemic recovery, manage spend against in-year budget and present options to balance
future years’ budgets and progress a range of transformation projects. The main challenges for this
quarter continue to be achieving and maintaining financial sustainability against increasing external
pressures. 
Challenges and risks
Financial position
The 2022/23 budget, approved on 15 February 2022, was reliant on £10.283 million of one off funding
measures. The projected budget gap for 2023/24 is over £14m rising to over £26m by 2027/28. All through
Quarter 3 Financial Services and the Council’s Corporate Management Team have been working with the
Business Transformation Steering Group to consider a range of measures to reduce this gap. 
Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is
currently experiencing unprecedented adverse market conditions, leading to significant rises in tender
prices for a wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects. The pandemic has also accelerated financial challenges, and the growth
from being the fastest growing local authority in Scotland places significant pressure on Midlothian to be
able to deliver services to its citizens. 
In order to respond to all of these pressures, a range of reprioritisation activity has taken place in Quarter
3, with a reprioritised Capital Plan to be presented to Council in Quarter 4, and options to review what
services are delivered and how they are delivered as part of the savings measures to reduce the funding
gap. 
National Care Service
The estimated funding gap for the next three financial years does not include the associated costs of the
Scottish Government’s National Care Services (Scotland) Bill.  If enacted, the bill would have fundamental
implications for the community and for Local Government itself.  The wide reaching changes in the bill aim
to deliver a National Care Service by the end of the parliamentary term, which will impact on all aspects of
the work of the Corporate Solutions team, including financial implications, in both revenue and capital, our
asset base, our workforce, governance and legal arrangements and our digital infrastructure and
platforms. It will require an immediate focus for the foreseeable future and this will inevitably have
implications for other priority work at a time of continued resource constraint.
Cost of Living Crisis
Corporate Solutions Performance Report Quarter Three 2022/23
Performance, Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.4
Page 39 of 106

Page 40

Midlothian’s citizens are facing significant financial challenges. The impact on households is already being
noted across the UK with 87% of adults reporting an increase in their cost of living in April 2022 (Office for
National Statistics; Francis-Devine et al, 2022). The UK is currently facing an unprecedented storm of
increasing prices, bills and tax. The 40 year high inflation rate of 9% is the main driver of the cost of living
crisis which has outstripped wage and benefit increases. The price rises will impact low-income households
the hardest as a larger proportion of their bills are on energy and food. The Resolution Foundation
estimates an extra 1.3 million people will fall into absolute poverty in 2023, including 500,000 children.  
As our citizens feel the impact of the Cost of Living Crisis, they will seek additional support from public
services; in particular local authorities. To respond to this emerging crisis, the Council established a Cost of
Living Task Force last year, which is chaired by the Council Leader and meets fortnightly. 
In Quarter 3, the Council established two ‘Warm and Well’ hubs in the Lasswade and Newbattle libraries,
as safe and warm spaces that all Midlothian citizens can access. The hubs provide free hot food and drinks,
the opportunity to socialise with others and access free wifi to work, study, as well as enjoy books, jigsaws
and games. 
The Revenues Team is also reporting that the requests for funding remain consistently high, with over
£238k awarded from the Scottish Welfare Fund and 1743 applications for Crisis Grants. These figures are
similar to those seen in Quarter 2 and demonstrate the significant challenge faced by our communities. 
Risks
The Council’s Strategic Risk Profile is presented to Audit Committee quarterly, retrospectively. For Quarter
3, the most critical risks to the Council were Financial Sustainability, Climate Change and the Change
Programme. Corporate Solutions is key to the delivery of mitigating actions to these risks; through the
development of the strategic plan and associated Medium Term Financial Strategy, and driving forward
the Council’s transformation programme to derive change and redesign services.
Transformation
Corporate Solutions will “deliver forward looking services fit for a modern 21st
Century organisation and put the citizen at the centre of Service Redesign”.
Corporate Solutions encompasses Finance, Human Resources, Digital, Customer and Communication
Services, Legal & Governance and Corporate Resources. 
The Council’s transformation programme is centred on the route map and its nine drivers for change.
Corporate Solutions has a particular focus on the delivery and acceleration of the Capital Programme,
delivering digital first and hybrid working. The redesign of services and the changes to build back better
are predicated on the overarching principle that in delivering services, whether commissioned internally or
externally, we will keep our communities, our employees and our environment safe, at the same time as
meeting our commitment to being carbon neutral by 2030. 
As a strategic partner, NESTA, the UK's innovation agency for social good are, through their people
powered results team, supporting us to pioneer new approaches to achieving change and innovation.
These approaches are smarter, faster, more collaborative and more inclusive of citizens and people
working at the front line. This work recognises that people who are closest to services are the experts in
Page 40 of 106

Page 41

both their own experience and the community they live in, but often don’t have enough influence over
transformation efforts. 
The key activity which underpins this work and which the service is focused on includes:
• Securing continued financial sustainability and maintaining strong financial management across the
Council through the delivery of the Council's Medium Term Financial Strategy (MTFS)
incorporating Capital Strategy and Capital Investment plans, Reserves Strategy and Treasury
Management Strategy;
• Nurturing a highly motivated and effective workforce through the delivery of the Workforce
Strategy and the development of Service Workforce Plans;
• Digital first and embracing data insight and analytics by developing and implementing a refreshed
Digital Strategy and Digital Learning Strategy;
• A refresh of the Customer Services Strategy and implementation of the online payments and
services (CSP) platform;
• A refreshed Procurement Strategy and Contract Delivery Plan.
Medium Term Financial Strategy (MTFS)
The core objective of the MTFS is to secure the Council’s financial sustainability during an ongoing period
of financial constraint coupled with acute service demand pressures and increasing customer
expectations.
The MTFS is not only about balancing the budgets, it provides a means to ensure as far as possible
that the limited resources available to the Council are targeted on delivery of improved outcomes,
particularly against the key priorities of:
• Reducing the gap in learning outcomes
• Reducing the gap in health outcomes
• Reducing the gap in economic circumstances
• Reducing Midlothian carbon emission to net zero by 2030
Achievements
• Presentation to Council of a full suite of financial monitoring reports for Quarter 2 to promote
sound financial governance.
• Development of a detailed Medium Term Financial Strategy with particular focus on 23/24 base
budget and Local Government Finance Settlement.
• The finance team continue to provide in-depth financial input to key revenue and capital projects
embedded in the Medium Term Financial Strategy.
• Resources continue to be prioritised to process Scottish Welfare Fund applications as soon as these
are received. This has meant that processing times for change in circumstances for benefit
applications etc. are currently experiencing some delay as noted later in the report.  However
continuous improvement has been made from Q1 (69 days) to Q3 (35 days) reducing processing
times for new benefit claims. Processing times for change of circumstances has also improved from
17 days in Q2 to 12 days in Q3.
Page 41 of 106

Page 42

• In this quarter £238,444 was awarded from the Scottish Welfare Fund. 1,743 applications were
received for crisis grants of which 881 met the criteria and resulted in payments of £96,470. We
currently have no facility to report on the reasons our customers are not qualifying for a grant but
common reasons include: Crisis grant applications have exceeded the maximum amount allowed in
a period (which is 3 applications in a year) and customers do not meet the set criteria for the
award.
• Community Care Grant applications totalled 364 of which 128 payments were made totalling
£141,974.
Workforce Strategy
The purpose of the Workforce Strategy is to ensure that the Council continues to have a workforce that is
able to deliver positive outcomes for the people of Midlothian. It sets out an approach to supporting,
developing and reshaping the workforce now and in the future in response to changes as a consequence
of national and/or local issues. It is underpinned by the Council’s values and vision. 
The Workforce Strategy is an important tool to outline the organisation’s approach to articulating how
workforce issues will be managed and ensures the Council has the people and skills to manage change and
deliver services effectively and efficiently.
Achievements
• Our Employment and Reward and Business Applications teams successfully implemented the Local
Government Worker pay award and associated backdated payments.
• Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to
support the wellbeing of our staff.
• First phase of hybrid working staff survey was conducted this quarter, 1,000 staff members took
part which provided valuable insights into staff wellbeing whilst working from home/in the
community or office based.
• A new HR strategic lead joined this quarter, providing strategic HR leadership to the organisation
and leading the HR team to provide services to colleagues across the Council.
• As part of transformational activities, the Human Resources Business Partners continue to
contribute a significant amount of resource working with services supporting various service
reviews. Work also continues with services on various employee relations cases across the council
supporting managers and providing guidance in relation to council polices. The team in conjunction
with communications developed recruitment documentation for LGW job adverts, designed to
promote what Midlothian has to offer as an employer.
• We continue to track our gender pay gaps and employee turnover rates. Turnover varies through
the year. Consideration of the levels of turnover across services, locations and particular groups of
employees helps to inform workforce planning and resourcing. Aside from 2020/21 where staff
turnover was 5.9%, the turnover rate has been consistent the last 3 years between 9-10.5%.
Turnover rate over the last few quarters has been static between 2.4 and 3.6%. Rate for Q3 2.4%.
Page 42 of 106

Page 43

Supported by the appointment of SOCITIM Advisory (Society for innovation, technology and
modernisation) as a strategic partner and led by the Digital First Board, work progressed to deliver an
ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering People, Enabling Growth”.
Aimed at improving the way services are delivered to Midlothian citizens, the strategy sets out how local
outcomes will be improved by delivering digital services to digitally connected communities. 
Among the aims set out in the new strategy are plans to:
• Refresh the council’s approach to customer service, focussing on ‘digital first’, while making sure
alternatives remain in place for those who need them
• Have a council website that meets customer needs , enabling customers to request and pay for
services online and to log in to see their interactions
• Implement an update service, so that customers contacting the council online can receive follow up
text messages or emails
• Look at opportunities to automate and better integrate processes so that staff can focus on the
things that matter most to customers
• Enable people to stay independent and healthy for longer by using data and technology
• Introduce bookable online and face-to-face appointments so that customers don’t have to waste
time queuing or travelling and to help the council reduce costs
• Review and improve online engagement with customers, including online consultations,
communications and social media
• Promote Midlothian as a digital destination, creating an environment that attracts leading digital
businesses to the area and supporting the innovation of start-ups
• Cultivate digital skills in our communities, ensuring that young people have access to the
technology and support that they need to improve educational outcomes and to prepare them
with the skills they need for the future
• Reduce digital exclusion and empower learners of all ages, enabling online access and supporting
them to develop digital skills
• Support Midlothian to achieve high speed connectivity, smart infrastructure and resilient cyber
defences
Achievements
• Continued progression of the Digital Services Strategy ensuring the Council has the capacity and
skills to take forward the associated investment and delivery of plans.
• Hybrid Working/Office refresh: A further 500 mobile phones have been migrated to new platforms
to allow better integration with O365 plans. Thousands of laptop and PC’s have been upgraded to
the latest Windows 10 version. The Council agreed the move to hybrid governance meetings in
December 2022. Work is underway to have this implemented for Quarter 4.
• Target Operating Model: A new structure was agreed to strengthen the core staffing of Digital
Services by Council and CMT.  The Digital Client Services Manager and Cyber Security and
Information Governance Manager posts have been created and appointed to.
• Education strategy: New Web Filtering software has been successfully piloted in schools. A new
Wi-Fi network for Chromebooks and iPads has been introduced. A 3rd party Wi-Fi audit for schools
has taken place and the actions are being implemented to improve coverage and capacity.
• Digital enabled projects: a number of business applications have been upgraded this quarter
including Mosaic, TotalMobile, OpenRevenues, Civiapay, Civia Automation and Committee
Digital Strategy and Digital Learning Strategy
Page 43 of 106

Page 44

Management System which continue to improve customer and staff experience. As part of the
leave and time recording project, staff annual leave and flexitime recording for phase 1 (Etarmis
users) migrated over to ITRENT, the councils HR payroll system, in December. Using our payroll
system to record leave will result in more efficient payroll and annual leave year end processes
with the benefit of having staff information on one system.
• Cyber Security resilience: A Cyber Incident Response partner has been established to provide
incident management and forensic support. A number of phishing exercises on staff have been
completed, a new cyber training platform has been purchased.
Customer Service Strategy
The Customer Service Strategy defines the key drivers that will enable Midlothian Council to deliver a high
level of service to our communities. It outlines the commitment to provide choice to the customer in the
way services are accessed and provided. This includes innovation, partnership working and optimising the
use of technology within resource constraints. The strategy will help us to change the way we deliver
services utilising the latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers using the
current resources, systems and processes. This means that the adoption of digital and automated
processes will be key to continuing to provide a seamless customer journey, satisfying enquiries at the first
point of contact and meeting increased demand. 
Customer self-service and new automated processes can help deliver some key services without
customers dealing directly with a member of staff and could truly transform the way the Council deliver
services. Increasing the pace of digital transformation, particularly in front-facing customer services, will
be a service and corporate priority.
Achievements
• Customer Service Platform (CSP) - the Registrars module went live this quarter. This means that
customers can now request and pay for replacement birth, death and marriage certificates online,
at a time that is more convenient to them; and reduces the demand on the team through
introducing this self-service functionality. Other modules in progress are missed bins, assisted
collections, additional recycling containers, bulky uplifts and Subject Access Requests. These are all
in either design, configuration, build or test phases. The core build for the customer feedback
module is complete with final build refinements being progressed.
• The work programme CSP was reviewed during Quarter 3, with a further 20 modules identified for
implementation in the first half of 2023. These include civic licence applications and environmental
health service requests. CSP is crucial to the way the Council transforms the customer experience
through redesigning key services that will improve the end to end customer journey.
• December saw the launch of two ‘Warm and Well’ Hubs in Lasswade and Newbattle libraries,
providing free soup and hot drinks plus access to all other library resources such as free wifi, books
and information.
• Library Services remain busy with the majority of activities and events, which had been suspended
due to COVID, having resumed. Book Week Scotland 2022 saw 51 events take place across libraries
with almost 2000 people attending. Gorebridge Library has been selected as one of the first in
Page 44 of 106

Page 45

Scotland to host a ‘Lend and Mend Hub’ as part of a trailblazing pilot project managed by the
Scottish Library and Information Council. The hub, which is funded by the John Lewis Partnership
£1m Circular Future Fund will help the local community and wider to repair, reuse and upcycle
everyday items. Issue figures have recovered and surpassed this for the same period in 2019-20
with an increase in Q3 of nearly 10% for physical and virtual issues. 
• There continues to be a steady volumes of calls via our Contact Centre, as well as webforms and
social media and the contact centre have dealt with 9000 emails this quarter. Call handling
performance has improved slightly with 64% of calls answered in Q3 compared to 62% in Q1 and
Q2. Rate of call abandonment has remained consistent with no change from Q1 at 6%.
Procurement Strategy
The procurement function has a central role in supporting the Council to achieve its strategic priorities
within a constrained financial envelope. Procurement allows the Council to repurpose its spending power
to drive our key strategic priorities and to secure the best possible value and outcomes for Midlothian.
Effective procurement can maximise the value of every pound spent in terms of jobs, skills and supply
chain opportunities in the local community. We will aim to address economic, social and environmental
considerations at all stages of the procurement cycle within the rules of open, fair and transparent
competition. 
The Procurement team, in conjunction with Economic Development, have developed a Small and Medium
Enterprise (SME) Strategy to support and assist local businesses to win contracts fairly and transparently in
a competitive market. We will further develop our collaborative and commercial relationships with key
partners as part of our strategic category management approach, to deliver the best possible outcomes for
the citizens of Midlothian. 
Achievements
• Work continues on the development of the SME/Procurement strategy. The team have reviewed
and streamlined the non-competitive action process, the request for procurement and developed a
non-regulated procurement process and new contract database. The team are working to
implement a review of the procurement arrangement across the Council including continuing to
explore options for joint working with neighbouring councils, populating and maintenance of the
new contract database.
• The team continues to utilise framework agreements with Scotland Excel and Procurement for
Housing (amongst others) which not only provides an easier route to market but also delivers value
for money.
• A range of high value/complex contracts continue to be awarded and key activities include
overhaul of Contract Database and City Deal participation. A follow up review of upcoming expiring
contracts within Health and Social Care began in Q2 and is in early stages. The review will look for
opportunities to extend services, and consolidate opportunities for efficiency.
• Progress being made for consultation on a new procurement structure, designed to increase the
capacity and capability in this area.
• The Annual Procurement Report 2021/22 was presented to Council in December 2022.
Page 45 of 106

Page 46

Midlothian is projected to have the highest percentage change in population size of all mainland council
areas in Scotland. From 2018 to 2028, the population of Midlothian is projected to increase from 91,340 to
103,945. This is an increase of 13.8%, which is in contrast to a projected increase of 1.8% for Scotland as a
whole, with a 40.9% increase in older people over 75. In addition, Midlothian has 10 zones which falls into
the most deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes being built in the
affordable housing bracket, in addition to the expansion in Council house building. This construction will
directly support employment and will see a steady increase in the value of Council Tax income received
over time. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship
opportunities, opportunities for businesses and communities and families hard-hit by the impact of
COVID-19. These new opportunities help lead the way out of the pandemic and towards a better future for
Midlothian. 
Midlothian’s approved Capital Strategy sets out the infrastructure required to meet those demographic
pressures and includes the financial contributions Midlothian will make to the Edinburgh and South East
Scotland City Region Deal. Encompassing five main themes the City Region Deal will bring significant
investment across the regions with total investment of circa £1.3 billion across: 
• Research, Development and Innovation: £751 million
• Integrated Regional Employability and Skills: £25 million
• Transport: £156 million
• Culture: £45 million
• Housing: £313 million
Through the Data Driven Innovation strand the Deal will leverage existing world-class research institutes
and commercialisation facilities in order that Easter Bush becomes a global location of Agritech excellence.
The Easter Bush project includes significant investment in transport infrastructure along the A701/2
transport corridor. In addition, by improving on-site infrastructure at Easter Bush and transport
infrastructure, The University of Edinburgh expects commercial partners will be able to co-locate at scale
to commercialise Agritech breakthroughs. 
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so
has to reflect the demands of Council services to ensure positive outcomes are achieved in the right place,
at the right time for the maximum benefit to Midlothian.  The extensive capital programme, totalling
£0.8bn, delivers new schools, a record investment in council housing, improved community infrastructure,
investment in the local transport network and in innovative developments such as the new low carbon
heat network in Shawfair. In light of the challenging financial landscape the Capital Programme has been
subject to a review and a reprioritised plan will be considered by Council in Quarter 4.
Growing Council
Page 46 of 106

Page 47

Page 47 of 106

Page 48

Page 48 of 106

Page 49

Appendix A
Page 49 of 106

Page 50

Corporate Solutions Q3 22/23 performance report  Trend Data A full review of quarterly performance data is available via Pentana (Browser login link - https://midlothian.pentanarpm.uk/login)
109
115
109 109
115
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Total number of female
employees in top 5%
42,825 45,903 44,243 46,715
38,422
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of virtual library visits
6776
4933
8343 8892 8956
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of Council Tax
transactions received online
362 354 331 338
283
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of social media
contacts via Contact Centre
2.58
1.72
0.49
Q1 22/23 Q2 22/23 Q3 22/23
Corporate Solutions - Average
number of working days lost
due to sickness absence
(quarterly)
1,844
3,893
3,345
2,710 2,783
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of webforms received
via Contact Centre
2.30% 2.40% 2.40%
3.60%
2.40%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Percentage of staff turnover
(including teachers)
247 253
364
257
311
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of Freedom of
Information requests received
(Council wide)
609
105 27
Q1 22/23 Q2 22/23 Q3 22/23
Number of Self isolation
support grant applications
received 2,173
2,189
2,107
Q1 22/23 Q2 22/23 Q3 22/23
Number of Scottish Welfare
Fund applications received
581,677
808,000
208,730
423,781
662,225
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Total amount granted from
Scottish Welfare Fund for crisis
grants and community care
grants (£) (cumulative)
2.3 2.7
3.5
2.5 3
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Average time in working days
to respond to complaints at
stage 1 (Corporate Solutions)
Target (5 days)
Page 50 of 106

Page 51

Our customers have choice in the way Council services are accessed and provided 
Channel-shift has increased by the adoption of new digital tools and automated practices 
Delivery of customer service excellence to our communities
Our Customers
Holistic
Modern
Hub and Spoke
One size fits one
Key highlights
Customer Service Platform (CSP) - the Registrars module went live this quarter. This means that customers can now request and pay for replacement birth, death and
marriage certificates online, at a time that is more convenient to them; and reduces the demand on the team through introducing this self-service functionality. Other
modules in progress are missed bins, assisted collections, additional recycling containers, bulky uplifts and Subject Access Requests. These are all in either design,
configuration, build or test phases. The core build for the customer feedback module is complete with final build refinements being progressed. The work programme CSP
was reviewed during Quarter 3, with a further 20 modules identified for implementation in the first half of 2023. These include civic licence applications and
environmental health service requests. CSP is crucial to the way the Council transforms the customer experience through redesigning key services that will improve the
end to end customer journey. 
In support of the cost of living crisis, December saw the launch of two ‘Warm and Well’ Hubs in Lasswade and Newbattle libraries, providing free soup and hot drinks plus
access to all other library resources such as free wifi, books and information. Library Services remain busy with the majority of activities and events, which had been
suspended due to COVID, having resumed. Book Week Scotland 2022 saw 51 events take place across libraries with almost 2000 people attending. Gorebridge Library has
been selected as one of the first in Scotland to host a ‘Lend and Mend Hub’ as part of a trailblazing pilot project managed by the Scottish Library and Information Council.
The hub, which is funded by the John Lewis Partnership £1m Circular Future Fund will help the local community and wider to repair, reuse and upcycle everyday items.
Issue figures have recovered and surpassed this for the same period in 2019-20 with an increase in Q3 of nearly 10% for physical and virtual issues. 
Areas of improvement 
There continues to be a steady volumes of calls via our Contact Centre, as well as webforms and social media and the contact centre have dealt with 9000 emails this
quarter. Call handling performance has improved slightly with 64% of calls answered in Q3 compared to 62% in Q1 and Q2. Rate of call abandonment has remained
consistent with no change from Q1 at 6%. 
Resources continue to be prioritised to process Scottish Welfare Fund as soon as these are received. This has meant that processing times for change in circumstances for
benefit applications etc. are currently experiencing some delay as noted later in the report.  However continuous improvement has been made from Q1 (69 days) to Q3
(35 days) reducing processing times for new benefit claims. Processing times for change of circumstances has also improved from 17 days in Q2 to 12 days in Q3. In the
quarter £238,444 was awarded from the Scottish Welfare Fund. 1,743 applications were received for crisis grants of which 881 met the criteria and resulted in payments
of £96,470. Community Care Grant applications totalled 364 of which 128 payments were made totalling £141,974. We currently have no facility to report on the reasons
our customers are not qualifying for a grant but common reasons include: Crisis grant applications have exceeded the maximum amount allowed in a period which is 3
applications in a year and customers do not meet the set criteria for the award.
44
54 59
37
47
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of complaints
received (Corporate Solutions)
43
57
69
45 35
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Average processing time for
new benefit claims (Days)
Target (25 days)
16
11 10
17
12
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Average processing time for
change of circumstances
(Days)
Target (8 days)
37,579
44,769
40,575
38,943 38,932
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of Contact Centre
calls
Page 51 of 106

Page 52

Digital by default
We pledge to optimise the ways in which the Council does digital, data and technology to work effectively, collaborate, make decisions, adapt
and innovate
We pledge to create better relationships between the Council and its communities by providing modern digital services that communities
wants to use 
We pledge to maximize opportunities for digital, data and technology to enhance quality of life, the economy, sustainability and individual
opportunity in Midlothian 
Key highlights 
 Continued progression of the Digital Services Strategy ensuring the Council has the capacity and skills to take forward the associated investment and delivery of
plans. 
 Hybrid Working/Office refresh: A further 500 mobile phones have been migrated to new platforms to allow better integration with O365 plans. Thousands of
laptop and PC’s have been upgraded to the latest Windows 10 version. The Council agreed the move to hybrid governance meetings in December 2022. Work is
underway to have this implemented for Quarter 4.
 Target Operating Model: A new structure was agreed to strengthen the core staffing of Digital Services by Council and CMT.  The Digital Client Services
Manager and Cyber Security and Information Governance Manager posts have been created and appointed to. 
 Education strategy: New Web Filtering software has been successfully piloted in schools. A new Wi-Fi network for Chromebooks and iPads has been
introduced. A 3rd party Wi-Fi audit for schools has taken place and the actions are being implemented to improve coverage and capacity. 
 Digital enabled projects: a number of business applications have been upgraded this quarter including Mosaic, TotalMobile, OpenRevenues, Civiapay, Civica
Automation and Committee Management System which continue to improve customer and staff experience. As part of the leave and time recording
project, staff annual leave and flexitime recording for phase 1 (Etarmis users) migrated over to ITRENT, the council’s HR payroll system, in December. Using our
payroll system to record leave will result in more efficient payroll and annual leave year end processes with the benefit of having staff information on one
system.
 Cyber Security resilience: A Cyber Incident Response partner has been established to provide incident management and forensic support. A number of phishing
exercises on staff have been completed, a new cyber training platform has been purchased.   
Areas of Improvement
The gap between requests received and resolved in the graphs below is principally as a consequence of the lead time for new devices, reflecting global demand and the
supply chain. Where necessary interim solutions are provided and the requests closed when a permanent resolution is secured. 
Work will progress on the Digital Services priorities to continue to drive the Council’s vision to improve outcomes using digital and data through the Digital First board,
ensure the Council is well positioned to take advantage of emerging national initiatives and exploit technology in order to reduce costs and improve services. 
Modern
1,983 2,115 1,969
2,298 1,964
1,757 1,917 1,719
2,038
1,802
Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23
Number of service requests
Received Resolved
3,478 3,538
3,141 3,311 2,9633,280 3,325
2,982 2,975 2,789
Q3 21/22 Q4 21/22 Q1 22/23 Q2 22/23 Q3 22/23
Number of service incidents
Received Resolved
Page 52 of 106

Page 53

Our Workforce
Our people deliver high performing services
We build an entrepreneurial council for future
We demonstrate strong and consistent leadership 
We Promote Equality, diversity and fairness 
Key highlights
 Our Employment and Reward and Business Applications teams successfully implemented the Local Government Worker pay award and
associated backdated payments. 
 Continuation of a rolling programme of Wellness@Midlothian initiatives to ensure we continue to support the wellbeing of our staff.  
 First phase of hybrid working staff survey was conducted this quarter, 1,000 staff members took part which provided valuable insights into
staff wellbeing whilst working from home/in the community or office based. 
 A new HR strategic lead joined this quarter, providing strategic HR leadership to the organisation and leading the HR team to provide services
to colleagues across the Council. 
 As part of transformational activities, the Human Resources Business Partners continue to contribute a significant amount of resource working
with services supporting various service reviews. Work also continues with services on various employee relations cases across the council
supporting managers and providing guidance in relation to council polices. The team in conjunction with communications developed
recruitment documentation for LGW job adverts, designed to promote what Midlothian has to offer as an employer. 
 We continue to track our gender pay gaps and employee turnover rates. Turnover varies through the year. Consideration of the levels of
turnover across services, locations and particular groups of employees helps to inform workforce planning and resourcing. Aside from
2020/21 where staff turnover was 5.9%, the turnover rate has been consistent the last 3 years between 9-10.5%. Turnover rate over the last
few quarters has been static between 2.4 and 3.6%. Rate for Q3 2.4%. 
Areas of improvement
Sickness absence days remain similar to that of last year council wide with no significant improvements.   For Corporate Solutions, of the FTE days lost
due to sickness, 65% was due to long term sickness, 17% self-certified, 18% short term absence. While there is no identifiable trend either in short term
or long term absences work continues with each service area to review attendance levels and support those staff who are absent to be able to return
to work. 
Holistic
7.26
9.33
2.71
4.81
7.89
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Sickness Absence Days per
Employee - cumulative (All
employees)
3.42
4.61
1.35
2.10
3.86
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Teacher Sickness absence days
8.80
11.22
3.25
5.92
9.51
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Local Government employees
Sickness absence days
2.37% 2.52% 2.57% 2.84%
3.58%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Gender pay gap between
average hourly rate of pay for
male and female(all employees)
Scottish average 21/22 (3.51%)Page 53 of 106

Page 54

Finance 
The grant settlement for 2022/23 means a further real terms reduction in core funding. The reliance on one off funding sources to
balance the 2022/23 budget combined with the challenging outlook for local government funding adversely impacts on the Council‘s
financial sustainability and will result in the need to cut services in 2023/24 and beyond. 
The Council has robust and effective financial management arrangements
Key highlights 
 Presentation to Council of a full suite of financial monitoring reports for quarter 2 to promote sound financial governance. 
 Development of a detailed Medium Term Financial Strategy with particular focus on 23/24 base budget and Local Government Finance Settlement. 
 The finance team continue to provide in-depth financial input to key revenue and capital projects embedded in the Medium Term Financial Strategy.
Areas for improvement: 
The 2022/23 budget, approved on 15 February 2022, was reliant on £10.283 million of one off funding measures. The projected budget gap for 2023/24 is
over £14m rising to over £26m by 2027/28. All through Quarter 3 Financial Services and the Council’s Corporate Management Team have been working
with the Business Transformation Steering Group to consider a range of measures to reduce this gap. 
Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is currently experiencing unprecedented adverse
market conditions, leading to significant rises in tender prices for a wide range of materials. There is evidence that inflation of between 10% and 15%
beyond BCIS predictions is affecting projects. The pandemic has also accelerated financial challenges, and the growth from being the fastest growing local
authority in Scotland places significant pressure on Midlothian to be able to deliver services to its citizens. 
In order to respond to all of these pressures, a range of reprioritisation activity has taken place in Quarter 3, with a reprioritised Capital Plan to be
presented to Council in Quarter 4, and options to review what services are delivered and how they are delivered as part of the savings measures to reduce
the funding gap. 
Sustainable
Holistic
Modern
Preventative
110% 108%
146% 127% 92%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
In year recovery of
overpayments-% of all
Housing benefit overpayments
identified
Target (80%)
11% 14%
5%
9%
4%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
All recovery overpayments-as
a % of all HB overpayment
debt
Annual Target (20%)
95% 95%
94.3%
94.9% 94.9%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of invoices sampled and
paid within 30 days -
Corporate Solutions
Target (95%)
Page 54 of 106

Page 55

Procurement  Best Value is evidenced Council Wide in the procurement of goods and services 
Effective contract and supplier management across the whole of the procurement journey  
Key highlights
 Work continues on the development of the SME/Procurement strategy. The team have reviewed and streamlined the non-
competitive action process, the request for procurement and developed a non-regulated procurement process and new contract
database. The team are working to implement a review of the procurement arrangement across the Council including continuing to
explore options for joint working with neighbouring councils, populating and maintenance of the new contract database. 
 The team continues to utilise framework agreements with Scotland Excel and Procurement for Housing (amongst others) which not
only provides an easier route to market but also delivers value for money. 
 A range of high value/complex contracts continue to be awarded and key activities include overhaul of Contract Database and City
Deal participation. A follow up review of upcoming expiring contracts within Health and Social Care began in Q2 and is in early stages.
The review will look for opportunities to extend services, and consolidate opportunities for efficiency.   
 Progress being made for consultation on a new procurement structure, designed to increase the capacity and capability in this area. 
 The Annual Procurement Report 2021/22 was presented to Council in December 2022.
Areas of improvement 
Work will continue to progress on the Procurement priorities: Review and reshape the procurement service, implement learning from the
Scotland excel review and in partnership with Economic Development and stakeholders continue to ensure business community benefits in
the supply chain to maximise opportunities for local people.
Holistic
Sustainable
Hub and Spoke
One size fits one
15.44% 14.68% 16.81% 13.78%
18/19 19/20 20/21 21/22
% of procurement spent on
local enterprises (LGBF)
Scottish average 21/22 (27.4%) Page 55 of 106

Page 56

Page 56 of 106

Page 57

01. Progress in delivery of strategic outcomes
Education Performance Report Quarter Three 2022/23
Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.5
Page 57 of 106

Page 58

Page 58 of 106

Page 59

01. Progress in delivery of strategic outcomes
21/22: Midlothian Single Plan Priority Reducing the gap in learning outcomes
Priority 1: Attainment and Achievement
1.1 Improve attainment within the Broad General Education (BGE) stages:
Trend Data & Target
2017 2018 2019 2021 2022 Ave. (17-19) Target
Pr Literacy 62.25% 74.68% 72.76% 65.75% 68.20% 68.86% 71.5%
Pr Numeracy 71.14% 79.63% 77.77% 72.80% 76.05% 75.34% 72.0%
S3 Literacy 76.73% 80.25% 86.80% 80.70% 69.90% 88.0%
S3 Numeracy 88.81% 87.68% 89.56% 88.50% 88.68% 90.5%
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.1.1 Develop and
implement a raising
attainment strategy
- Draft strategy still being developed and to be shared with
school leaders and key networks.
- Literacy and Numeracy guidance in place reflecting key
pedagogical approaches outlined in Draft Raising Attainment
Strategy.
- Literacy, Numeracy and QAMSO Networks involved in
supporting school/ASG moderation.
- Further training and support for QAMSO Network will
develop their expertise in assessment and moderation,
enabling them to lead staff training within their own
schools/ASG.
- Attainment Visits support school engagement with strategy.
- Data uplift reveals a positive shift in attainment predictions
and progress towards stretch aims.
- Final Strategy agreed and in place.
- QA discussions and visit 3 activity supports engagement
with strategy and future school improvement priority
planning.
- Themes from Visit 2 (Focus 2.3) reflect range of effective
pedagogical approaches.
- Schools and ASGs planning for Moderation activity within
BGE (literacy/numeracy focus determined by local data and
utilising Midlothian Curricular Frameworks)
- School SIRs include evidence of approaches taken and
progress made towards stretch aims.
- School SIPs and PEF plans for 2023-24 reflect strategy.
- Plan for professional learning established in consultation
with schools and networks and informed by analysis of
SQR, attainment data and PEF reporting.
- Analysis of SQR reveals effective moderation taking
place in all schools/ASGs and plans in place to continue
to build capacity and activity in session 2022/23.
1.1.2 Develop a full
range of curriculum
frameworks.
- Professional Learning Offer in place to support  engagement
with literacy and numeracy frameworks
- January in service days training carried out on Literacy
Frameworks with 50% of primary schools.
- 150 teachers attended training on the digital numeracy
frameworks on Jan in service day.
- Updated draft frameworks shared with EEG
- The EEG has agreed a set of primary curriculum frameworks
(with the permission of South Ayrshire Council) to pilot 2022-
23. Agreed draft Curricular Frameworks (with exception of
Literacy and Numeracy) in use in identified schools/ASGs for
pilot and evaluation
- The revised Midlothian Numeracy framework has been
launched with headteachers. Working group creating
assessments and pilot schools trialling these.
- The revised Midlothian Literacy framework is currently being
developed and is being piloted by some schools. Final draft
of writing Early- 4th level complete and in use Jan 2023
- Endorsed by Education Scotland Literacy Officer Dec 22.
- HWB framework has been drafted, with the Languages
framework still to be drafted. Liaising with DO for 1+2 MLs.
- Deliver Leadership of Curriculum Design training. Engage
partners eg Education Scotland Curriculum Innovation
Team to support action research in Curriculum Design. E.g.
West Partnership curriculum redesign project
- Professional Learning Offer in place to support
engagement with literacy and numeracy frameworks
- Literacy, Numeracy and QAMSO Networks involved in
supporting school/ASG moderation.
- Updated wider curriculum frameworks to be shared with
EEG.
- Develop and introduce curriculum guidance for schools
- All schools using Literacy and Numeracy Frameworks to
support planning, teaching and assessment. Visit 2 will
give information on use of frameworks
- Finalised suite of wider curricular frameworks launched
with all schools and settings for use from 2023/24.
- Moderation activity planned for session 2023/24 utilising
Literacy, Numeracy and QAMSO Networks and
Midlothian Frameworks.
Page 59 of 106

Page 60

Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.1.3 Revise
Midlothian’s
Learning, Teaching
and Assessment
policy.
- Progress update on key messages within LTA Policy for
school leaders and in collaboration with EEG.
- Development of Raising Attainment strategy and Literacy
and Numeracy Frameworks prioritised over this work initially.
Planned visit 2 QA activity and ongoing engagement with
Networks will provide evidence to inform LTA Policy
development in future.
- Professional Learning Offer for school leaders on strategic
leadership of elements of LTA Policy
- Themes from Visit 2 (Focus 2.3) support with LA Self
evaluation of strengths and areas for improvement to
inform the final Policy.
- Ongoing stakeholder engagement to inform final policy.
- Final LTA Policy agreed for all school engagement during
session 2023/24
- QA Processes and analysis of schools SQR  reveal an
increasing percentage of schools rated as good/very
good for key Quality Indicators.
- Consultation with school leaders and networks to inform
professional learning offer for session 2023/24.
1.1.4 Develop and
pilot an effective
tracking and
monitoring system,
incorporating
development of
stretch aims.
- Pilot phase of work on implementation of tracking and
monitoring system with one ASG will continue during this
period.
- Monitor and review the impact of the system within and
throughout the schools.
- Working group, as part of the raising attainment strategy
group will meet and discuss options for primary and
secondary schools to take forward.
- Final phase of evaluation of the new system. Review and
consultation with working group and schools involved.
- Any significant or minor changes to the approach to be
made before full implementation in all schools next quarter.
- Training programme on the system to be planned and
scheduled with all schools.
- Full implementation of final tracking system in all schools.
- Training programme on the system to be planned by
ASG and data champions to take forward ownership
within the school.
1.1.5 Support schools
and settings to make
best use of digital
tools to enrich,
enhance and improve
learning, teaching
and assessment
- Relaunch Digital Loan Bank to ensure schools and settings
can access high quality digital technology and training
- Pilot BGE Digital Literacy Framework in primary schools and
settings through Digital Leaders
- Use staff audit from May 22 to explore creation of a learning
and teaching app library for pupils and staff, ensuring DPIA
compliance
- Innovation project work in relation to EfL, linking schools
across Midlothian- principally access to VR, creativity with
iPad in Senior Phase, Future Classroom
- Deploy devices to new P1 intake using remote deployment
model + flexible support
- Review short term targets with schools and settings against
agreed measures and evaluate progress. Co-create short
term targets (Jan-June)
- Pilot Third and Fourth levels of Digital Literacy Framework
through secondary school working group
- Launch Google Workspace Skills for P7-S2 pupils to
establish a benchmark standard of fluency using
Workspace by end of BGE
- Review Professional Learning offer and plan for next steps
- Build engagement with EquatiO through Secondary Maths
subject lead network
- Evaluate impact of implemented changes and use this to
inform next steps
- Review and evaluate impact of Digital Literacy
Framework
- Finalise app library offer for 23/24 and associated training
offer
- Survey pupils, families and staff to understand to identify
changes in attitude, proficiency and use of digital tools to
enrich, enhance and improve learning, teaching and
assessment
- Plan and host launch event for Midlothian’s Apple
Regional Training Centre, showcasing the work of our
schools and settings and learning from others
- Managed transition of all devices and reallocation of
school leavers’ devices
Page 60 of 106

Page 61

1.2 Improve attainment within the senior phase by maximising opportunities through curriculum planning, consortium arrangements and partnership delivery,
including addressing the ASN Senior Phase Gap
Trend Data & Targets for School Leavers
2018 2019 2020 2021 Ave. Target
Lit & Num SCQF Level 4 88.93% 89.45% 90.48% 89.85% 89.93% TBC
Lit & Num SCQF Level 5 66.33% 63.76% 65.12% 66.36% 65.08% TBC
1+ @ Level 4 97.23% 96.67% 97.17% 95.44% 96.84% 96.0%
1+ @ Level 5 85.49% 86.01% 84.43% 84.72% 85.56% 86.0%
1+ @ Level 6 60.58% 56.08% 60.62% 59.98% 59.19% 60.0%
5@ Lv 5 60.58% 58.37% 63.45% 63.17% 60.86% 65.0%
3@ Lv 6 46.62% 42.89% 49.94% 47.66% 46.09% 50.0%
5@ Lv 6 32.56% 30.05% 36.94% 33.98% 32.33% 35.0%
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.2.1 Develop and
implement a raising
attainment strategy
- Strategic Group established in Nov 22, plans shared and ongoing
engagement with HT Group, EEG
- Literacy and Numeracy guidance in place reflecting key pedagogical
approaches outlined in Draft Raising Attainment Strategy and
shared directly with HTs, English and Maths Departments/DHT
Networks.
- Evaluation on visit 1 and QI visit 2 planning has begun and these
visits will take place January to March 2022
- Attainment Visits and Secondary HT meetings support
school engagement with strategy.
- Data uplift shows a positive shift in attainment predictions
within the senior phase.
- Final agreed strategy in place.
- Secondary School Improvement Reports include
evidence of approaches taken and progress made
towards stretch aims.
- School SIPs for 2023-24 reflect strategy.
1.2.2 Review the
Senior Phase
curriculum offer
and pathways into
positive sustained
destinations.
- Midlothian Senior Phase Principles agreed and expressed through
an explicit Curriculum Rationale.
- Session 23/24 curriculum pilots agreed with all secondary schools
that ensure increased opportunities for students and collaborative
working.
- Now drafting Curricular Framework, which should be ready to share
by February break.  Pathways work progressing, by engaging with
Aberdeenshire and East Lothian this month.
- Deliver Leadership of Curriculum Design training. Engage
partners eg Education Scotland Curriculum Innovation
Team to support action research in Curriculum Design. E.g.
West Partnership curriculum redesign project
- Agree consultation and redraft timeline, likely to be
complete by June 2023
- School 23/24 SIPs reflect this approach
1.2.3 Review and
develop
approaches that
will allow
secondary schools
to implement
reduced class
contact time, in line
with SG policy,  for
teachers from
August 2024
- Agree a Midlothian approach to the student and staff day, from
August 2024, that ensures an appropriate balance between equality
across schools and the context/need of each school.
- Continued to access national information, some agreement in
models with secondary schools from August 2023.
- Confirm for each secondary school an action plan that
supports the transition to the agreed approach from August
2024.
- Continue with school level data analysis from primary and
secondary. Also to look at the Welsh consultation and
establish a paper to consult on within Midlothian
- Work with Business Executive colleagues to ensure that
our DSM model and allocations support the implementation
of approaches from August 2024.
- School 23/24 SIPs reflect this approach
1.2.4 Revise
Midlothian’s
Learning, Teaching
and Assessment
policy.
- Progress update on key messages within LTA Policy for school
leaders and in collaboration with EEG.
- Professional Learning Offer for school leaders on strategic
leadership of elements of LTA Policy
- Themes identified as part of Visit 2 activity (Focus 2.3)
support ongoing LA Self evaluation of strengths and areas
for improvement to inform the final Policy.
- Ongoing stakeholder engagement to inform final policy.
- Final LTA Policy agreed for all school engagement
during session 2023/24
- Consultation with school leaders and networks to
inform professional learning offer for session 2023/24
Page 61 of 106

Page 62

Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.2.5 Develop and
pilot an effective
tracking and
monitoring system,
incorporating
development of
stretch aims.
- Pilot phase of work on implementation of tracking and monitoring
system with one ASG, and initial sharing with HT group.
- Monitor and review the impact of the system within and throughout
the schools.
- Final phase of evaluation of the new system. Review and
consultation with working group and schools involved.
- Any significant or minor changes to the approach to be
made before full implementation in all schools next quarter.
- Training programme on the system to be planned and
scheduled with all schools.
- Full implementation of final tracking system in all
schools.
- Training programme on the system to be planned by
ASG and data champions to take forward ownership
within the school.
1.2.6 Support
schools and settings
to make best use of
digital tools to
enrich, enhance and
improve learning,
teaching and
assessment
- Innovation project work in relation to EfL, linking schools across
Midlothian- principally iPad Creativity Apps in the Secondary
Classroom, Future Classroom, Data Science Across the Curriculum
- Future Classroom in Partnership with University of Edinburgh (UoE)
defined Planning and technical implementation in participating
secondary schools. The Collaborative enquiry cycle takes place
Oct-Dec
- iPad Creativity Apps in the Secondary Classroom
- Support technical delivery of data science projects in Newbattle
High School and Roslin PS
- Implement innovation project work- Supporting Music
Technology in the Senior Phase
- Implement innovation project work- Supporting Computing
Science Qualifications in the Senior Phase
- Continued work on iPad Creativity Apps in the Secondary
Classroom
- Continued work on Future Classroom
- Further development on Data Science Across the
Curriculum
- Review impact of all Senior Phase innovation project
work, evaluate progress, plan next steps
- Managed transition of all devices and reallocation of
school leavers’ devices
- Further development on Data Science Across the
Curriculum
Page 62 of 106

Page 63

1.3 Reduce the attainment gap between the most and least deprived children, including care-experienced children.
Trend Data & Targets
2018 2019 2020 2021 2022 Ave. Target
Pr Literacy – GAP FSM vs. No FSM 22.47% 29.35% NC 32.24% 26.83% 28.17% a 22%
Pr Numeracy – GAP FSM vs. No FSM 20.69% 22.69% NC 27.98% 24.29% 23.82% a 20%
S3 Literacy – GAP FSM vs. No FSM 22.57% 22.83% NC NC 28.88% 22.94% b 17%
S3 Numeracy – GAP FSM vs. No FSM 12.04% 21.27% NC NC 22.19% 16.35% b 17%
1+ @ Level 4 – GAP FSM vs. No FSM 4.9% 2.0% 3.2% 3.4% 2.5%
1+ @ Level 5 – GAP FSM vs. No FSM 23.6% 25.2% 19.8% 22.9% 19%
1+ @ Level 6 – GAP FSM vs. No FSM 30.7% 32.0% 35.0% 32.6% 30%
a Ave. is calculated from 2017-2021; b Ave.  is calculated from 2017-2019
NC – not collected
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.3.1 Build quality and capacity
within schools to improve
outcomes for all disadvantaged
children and young people, in
partnership with our Education
Scotland Attainment Advisor.
- Further development of Midlothian’s Professional Learning
Academy which will offer training, guidance and support to
school teams in improvement methodology, measuring
impact.
- Schools continue to monitor the impact of interventions and
universal offer on reducing the attainment gap.
- Engagement with schools through QA process ongoing
- QI school visits focus on evaluating impact of work
to reduce the attainment gap.
- PLA offer training, guidance and support to school
teams on improvement methodology measuring
impact
- Identification of children and young people living in
SIMD 1 and tracking of their attainment in
discussion with school leaders and Attainment
Advisor.
- Summary report to capture the impact
of interventions and universal offer on
reducing the attainment gap.
1.3.2 Robust plans for PEF
implemented and evaluated
across all schools.
- Schools continue to monitor the impact of their PEF plans and
interventions planned.
- HT session with Attainment advisor
- Attainment Advisor and SGM visited targeted schools (60%)
to discuss implementation. Analysis discussion on gap using
new data set and use of stretch aims.
- Analysis of all plans to highlight interventions and use of
therapeutic services.
- Survey issued to all schools to gain detailed information on
use of therapeutic services
- Schools evaluation of  impact of PEF plans
ongoing and evaluations discussed with HTs prior
to end of year school quality & improvement report
(SQIP) being finalised
- Survey completed to detail school use of
therapeutic services. Procurement framework being
developed in relation to therapeutic services offer
- Schools evaluate impact of PEF plans
in end of year school quality &
improvement report (SQIP)
1.3.3 Improve availability,
accuracy and use of complex and
intersectional data to target
support more effectively.
- Implement interim dashboard approach for all schools.
Training programme to be scheduled alongside this with data
champions.
- Pilot implementation of full new analytical dashboards for
schools to align with the new tracking and monitoring system
and actions 1.1.4 and 1.2.4
- Monitor and review the impact of the system within
and throughout the schools. Any significant or
minor changes to the approach to be made before
full implementation in all schools next quarter.
(align with 1.1.4 and 1.2.4)
- Training programme on the system to be
continued with all schools.
- Use of Progress & Achievement module for all
primary schools to ensure robust tracking of
predictions, will continue to be trialled. Schools
inputting information for discussion with QIMs in
January.
-
- Full implementation of final analytical
dashboard to align with tracking
system in all schools.
- Training programme on the system to
be planned by ASG and data
champions to take forward ownership
within the school.
Page 63 of 106

Page 64

1.4 Improved outcomes for vulnerable children and young people, and for those experiencing barriers to learning
Trend Data & Targets
2018 2019 2020 2021 Ave. Target
Pr Literacy - LAC/ASN Pupilsa  55.58% 53.26% NC 43.66% 47.61%a 53%
Pr Numeracy - LAC/ASN Pupilsa 61.48% 58.64% NC 52.18% 55.42% a 58%  
S3 Literacy - LAC/ASN Pupilsa 68.66% 87.67% NC NC 78.17% b 78%
S3 Numeracy - LAC/ASN Pupilsa 72.64% 68.32% NC NC 72.77% b 72%  
1+ @ Level 4 - LAC/ASN Pupilsa 91.79% 91.21% 92.95% 89.34% 91.32% 91%
1+ @ Level 5 - LAC/ASN Pupilsa 63.43% 69.23% 69.80% 67.44% 67.47% 69%
1+ @ Level 6 - LAC/ASN Pupilsa 32.09% 32.60% 43.96% 39.77% 37.10% 40%
a This contains pupils that are either LAC or ASN. Note that due to the small numbers in these categories the % can fluctuate quite significantly.
NC – not collected
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
1.4.1 Embed The Promise
across the education service
- Use the data to target support in schools that need this most in
order to fully implement The Promise, UNCRC and GIRFEC.
- Schools are trained in relationship/trauma based practice
- Schools are embedding person centred planning and decision
making
- The PLA facilitates training on the right’s of a child and the
language of care
- Schools are consulted on the draft amended exclusions policy
- Use the data to target support in schools that need this most in
order to fully implement The Promise, UNCRC and GIRFEC.
- Schools are embedding in relationship/trauma based practice
- QI school visits focus on ensuring that schools are improving
outcomes for vulnerable CYP in line with The Promise
- QI school visits focus on ensuring care experienced young people
are receiving their entitlements
- Schools will embed the new exclusion policy ensuring no formal or
informal exclusions of care experienced young people occur
- Midlothian’s parent and carer
survey reports that parents/carers
feel involved in the decision making
process when planning the
educational outcomes for a CYP
- Midlothian’s pupil survey reports an
increase in the % of learners
reporting that they receive the right
support at the right time
1.4.2 Improve availability,
accuracy and use of complex
and intersectional data to
identify the attainment gaps
for young people with
additional support needs and
other barriers to learning.
- Work on developing the data dashboard will continue, through
engagement with the service and schools.
- Attainment, ASN and Attendance analytical dashboards
developed to support this priority. Work will continue with the leads
of these areas to trial and refine the tools before being rolled out to
schools.
- Annual equalities report training for school leaders.
- Adapt SQIP to include equalities report.
- School leaders use the intersectional data to produce an annual
school equalities report within SQuIP and set out what action they
will take in the year ahead to reduce equalities issues.
- All schools to use the tracking and
monitoring system to understand
and target interventions to young
people
1.4.3 Pilot resource guidance:
‘Identifying, Assessing and
Providing for Additional
Support Needs’.
- ‘Identifying, Assessing and Providing for Additional Support
Needs’ draft policy shared with schools
- Short life staff  consultation group is formed to give initial feedback
on the new guidance, policies and procedures
- Short life parent/carer and pupil consultation group is formed to
give initial feedback on the new guidance, policies and procedures
- All schools to pilot the draft policy on ‘Identifying, Assessing and
Providing for Additional Support Needs’
- Schools provide final feedback on
guidance, policies and procedures
to enable a final draft to be created
session for 23/24
1.4.4 Establish an Education
Resource Group to ensure a
timely multi-agency response
to assessing and providing
for young people’s additional
support needs.
- Request for support panel meetings occur fortnightly with minutes
saved onto SEEMiS
- P7-S1 request for support transition panel
- N-P1 request for support transition panel
- QI visits to focus on the assessment of need and response to
providing support
- Staff survey to measure the
effectiveness of the new procedure
and measure impact on the CYP
1.4.5 Review Support for
Learning practice to ensure
capacity of workforce,
consistency and quality.
- PLA facilitate CLPL opportunities
- SfL network, including representation from LAs,  to draft a SfL
guidance paper supporting staff to understand 5 roles of SfL,
- QI visits to focus on the SfL practice and quality assure the data to
measure the impact of interventions
- SfL guidance paper to be finalised
and shared ready to embed in
session 23/24
Page 64 of 106

Page 65

Midlothian Single Plan Priority Reducing the gap in health outcomes
Priority 2: Included, Involved and Engaged: Wellbeing & Equity 
2.1 Improve Equity and Inclusion
Trend Data & Targets
2018/19 2019/20 2020/21 2021/22 Ave. Target
Pr Attendance Rate 94.43% 94.70% 94.04% 95.06% 94.56% 95%
Sec Attendance Rate 89.18% 89.20% 89.37% 90.99% 89.69% 91.5%
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
2.1.1 Extend professional
learning offer to promote
nurturing, trauma-informed
practice across schools and
settings. 
- Nurture Leads meetings re-commenced for school-based leads.
- Mapped out and initiated process of engagement to build
Framework for Relational Practice.
- Professional learning undertaken with 200+ Learning Assistant
with digital platform of resources created to support ongoing
professional learning and enquiry.
- Follow up opportunities (reflection circles) to enable focused
case discussions and problem solving.
- Exploratory research project into the supervision and support
needs of those staff working with children presenting with
significant emotional distress.
- Facilitate shadowing opportunities for
staff involved in enhanced nurturing
roles (eg. guidance teachers, nurture
staff, residential staff) followed by
collaborative enquiry opportunities to
reflect on learning.
Review of learning and identifying
needs to inform planning for 2023-24.
2.1.2 Revise Attendance
Strategy in partnership with
Children’s Services
- Attendance workstream established to analyse attendance data
to inform priorities and direction of the strategy (awaiting
dashboard access)
- Reviewed and revised attendance procedures to ensure in line
with national guidance and compassionate to the needs of
families.
Process of reviewing and piloting approaches underway based
on relational, practical and psycho-educational support to
promote attendance.
- Revised attendance procedures to be shared with all relevant
stakeholders for feedback.
- Co-produce attendance practice guidance that provides
consistent, evidence-based pathways to promote attendance.
- All schools to ensure the attendance
strategy is fully embedded within their
establishment
2.1.3 Develop a comprehensive
Family Learning Strategy
- Support implementation of the Family Learning strategy. The
multi-agency group met and Family Learning workshop held with
the vision revisited.
- Analysis of consultation responses gave clear actions which are
being developed into an action plan
-
- Strategy agreed and final version will be disseminated.
- Development of a central source of information about Family
Learning offer in Midlothian.
- Undertake consultation with
stakeholders about availability and gaps
across Midlothian. Revisions made to
improve awareness of family learning
and engagement in opportunities.
2.1.4 Develop ASD Strategy - Working group formed to create a Draft ASD strategy in
partnership with Health and Social Care to be written and shared
with all relevant stakeholders
- CLPL opportunities identified, PLA to facilitate identified training
needs
- Process underway to review and clarify role and responsibilities
within the neuro-developmental pathway
- Pilot ASD strategy across the directorate
- PLA to facilitate identified training needs
- Finalise and embed ASD strategy
across the directorate
- Apply to be an ASD friendly local
authority
2.1.5 Mental Health strategy
established
- Survey drafted for schools to gain an overview of the therapeutic
services that schools procure.
- Planning underway for analysis of need and services available to
children and young people.
- Seek children and young people’s views about what’s working
and not working in the support for wellbeing and mental health.
Identify children and young people reference group to support
strategy development.
- Development of strategy
Page 65 of 106

Page 66

2.2 Children have a greater understanding of their rights (UNCRC) and these rights are being met across our establishments
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
2.2.1 Carry out a Children’s
Rights Review with CYP and
staff across Midlothian, set
against the 7 principles of a
rights-based approach
- Launch of the Mental Health & Wellbeing Survey.
- Created criteria & evaluation for the Children’s Rights Review
based on long-term aims of Midlothian Children’s Rights Strategy
& 7 principles of a rights-based approach.
- Meeting held held with QIOs organising QI Visit 2 (Learning and
Teaching) to embed questions around children’s rights into every
school visit.
- Identified Rights-Respecting School leads.
- Identified and coordinated Children’s Rights Focus group
facilitators.
- Conduct Children’s Rights Review visits within identified schools.
- Hold Learner Conferences and gain views around the long-term
aims/vision of taking a rights-based approach in Midlothian, to feed
into Children’s Rights Review.
- Identify and facilitate focus groups of children & young
people, families, and stakeholders.
- Identify schools in each ASG to review in terms of
highlighting good practice and assets to build on within
Midlothian.
- Hold Parent Conferences and gain views around the long-
term aims/vision of taking a rights-based approach in
Midlothian, to feed into Children’s Rights Review.
- Collate, analyse & evaluate data from reviews.
- Create feedback summary from reviews per ASG
(including next steps/recommended actions)
- Attend ASG meetings to share feedback
summaries with HTs.
2.1.2 Develop and implement
the Midlothian Children’s
Rights strategy across the
Directorate, in partnership
with Children’s Services &
CLLE.
- Identify Steering group consultation teams to consult with to
consider long-term aims/vision of strategy (made up of key
stakeholders: Central team; Education Scotland; School staff;
Parents; Young People).
- Initial meetings with Steering Group consultation teams.
- Meet with Steering Group consultation teams to revisit the
long term aims and vision as thinking progresses.
- Start to hone into where Midlothian would like to be in 5
years’ time.
- Create Happy, Safe & Thriving (HST) ASG
working groups.
- Create terms of reference for HST ASG
working groups.
- HST ASG working groups to analyse
feedback summary and create action
plan/next steps for their ASG in terms of
professional learning.
- Follow-up focus groups about Mental
Health & Wellbeing Survey with S4-S6
about exam stress, and S1 transitions, to
feed into ASG working groups connected
with implementing the Midlothian
Children’s Rights Strategy.
- HST working groups to implement actions
created.
Page 66 of 106

Page 67

Priority 3: Self-improving Systems
3.1 Leaders at all levels work together within an empowered system to improve outcomes for children, young people and families
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
3.1.1 Comprehensive professional
learning opportunities to improve
quality of leadership at all levels,
including leadership of learning.
- Phased introduction of Professional Learning Academy (PLA)
offers. New HTs offered induction peer mentors. Four DHT
Network meetings took place in November 2022. Very positive
evaluation data.
- Delivery partnerships established within the PLA.
- Education Scotland delivered Curriculum refresh to Primary HTs
meeting in November
- PLA standardised evaluation form is being used by participants
to evaluate our input/impact. Monthly reports are sent to
Midlothian SLT using this data.
- PLA website leadership section updated.
- Planning has begun for delivery in February to June 2022 of a
series of leadership tools CLPL (Action Planning).
- Preparing for HMIe inspection CLPL ran in December 2022 with
further session planned for January 2023
- Phased introduction of Professional learning
Academy offers.
- Delivery and evaluation of SEIC leadership offer.
3.1.2 Deliver a minimum data set and
support data literacy to improve self-
evaluation through leadership
professional learning and data
champions.
- Work is ongoing to improve the data culture within the service
and preparations continue to be made for full-roll out of the data
improvement plan
- Work is on-going to develop a detailed plan for data champions
network and co-design job description, job tasks, training and
evaluation arrangements
- Data lead for Midlothian attends the SEIC Data & Analysis
Network 3-monthly meetings where good practice and support is
shared.
- Final refinement of data champions network to be
established in-line with the full implementation of
plan for next session
- Data lead for Midlothian attends the SEIC Data &
Analysis Network 3-monthly meetings where good
practice and support is shared.
- End of year evaluation and co-create
2023-24 activities.
- Develop programme of training with
professional learning academy for
2023-24.
3.2 Children and families participate in, influence and inform how we deliver our services
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
3.2.1 Refresh the Midlothian Parental
Involvement and Engagement
Strategy. Co-create this with
Midlothian parents using the National
Community Engagement guide.
- Form a PIE steering group with parent and staff representatives
from all 6 ASGs.
- Co-create PIE steering group action plan.
- Audit Parent Councils’ equity of representation amongst office
bearers and for attendance at PC meetings.
- Implementation of PIE steering group action plan.
- Use PC Equalities Audit to adjust PC guidance,
recruitment & promotional materials.
3.2.2 Learner Engagement Strategy
Page 67 of 106

Page 68

3.3 Quality Assurance activities lead to improvements in the quality of education provision across settings and schools
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
3.3.1 Quality Improvement framework
in place
- Schools and ELC settings continue to implement the QA
Framework and begin to align school and ELC settings
processes.
- Feedback gathered from EEG on format/organisation of visit 1
activity as vehicle for gathering required data.
- Schools and ELC settings implement the QA
Framework.
- Feedback via EEG on visit 2 activity.
- Evaluate the QA Framework with head
teachers and centre managers at the
end of year.
3.3.2 Programme of quality
assurance activities
- Risk register has been developed following QI visit 1.
- Planning has begun for QA visit 2 with a focus on Q.2.3  which
will lead  to clear LA self-evaluation of progress in schools
relating to Learning, Teaching and Assessment. QA visit 2 will
take place January to March 2023.
- Key messages from visit 2 activities inform LA LTA
Framework- this will now take place in Jan-March 2023.
- QA visit 3 provides schools, ELC settings and LA with
a clear picture of progress in raising attainment as well
as improvement over time.
- Final QA programme agreed and in
place for future sessions, able to support
with provision of clear information
regarding  capacity for improvement for
our schools and ELC settings related to
key QIs.
Page 68 of 106

Page 69

Midlothian Single Plan Priority Reducing the gap in economic circumstances
Priority 4: Life-Long Learning and Career-Ready Employability
4.1 Children and young people are well prepared for the world of work
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
4.1.1 Analyse opportunity data to inform
which careers offer the best
opportunities for Midlothian’s CYP over
the next 10 years.
- Collaborative enquiry complete and the report has
been written, with work ongoing to finalise the action
Plan.
- Work to progress on School College Partnership,
Foundation Apprenticeships, links through City Deal
(University link) and collaboration via digital across
schools.
- Align curriculum pathways with career range indicated by
opportunity data.
- Medium Term Strategy and associated Action Plan
agreed with all stakeholders to reflect outcomes from
ADES Review. Actions to run parallel to consultation on
Framework.
- School 23/24 SIPs reflect this
approach
4.1.2 Embed My World of Work (MWoW)
into the curriculum of every school
- This action was addressed through the Collaborative
Improvement in November. It will be delivered through
the associated Action Plan.
- Support remaining schools to embed MWoW into their
curriculum.
- Meet with SDS to target support where it is needed
through the associated action plan
4.1.3 Further develop bespoke Skills
Development Scotland tutor and
mentoring support for senior phase
secondary students
- Support provided to remaining schools to provide tutor
and mentor support.
- Met with SDS to target support where it is needed.
- Support remaining schools to provide tutor and mentor
support.
- Meet with SDS to target support where it is needed.
Page 69 of 106

Page 70

Priority 5: Finance & Resources
5.1 Deliver Best Value through:
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
5.1.1 Learning Estate - Learning Estate Strategy was approved at full
council in December 2022. Work is ongoing to
progress prioritised projects.
- As Q3 - Provide update on LES progress.
5.1.2 DSM Review - Complete the ELC DSM consultation.
- Finalise the ASN DSM
- Complete the ASN DSM consultation. - Continue comms and roll-out of DSM
5.2 Equipped for learning:
Key Actions Q3 – Completed activity Q4 – Planned activity Q1 23/24 – Planned activity
Transformation
Devise and deliver Phase Two of the Equipped for
Learning project to ensure positive, sustained impact
for children and young people
- Delivery of workstream actions as detailed in
EfL Phase Two project plan
- Delivery of workstream actions as detailed in EfL
Phase Two project plan
- Delivery of workstream actions as detailed
in EfL Phase Two project plan
- Review of Phase Two and scoping for
Phase Three
Asset Management
Confirm asset management strategy including
investigating provision of a
device when a pupil leaves school and develop agreed
deployment plans
then Implement.
- Developed reporting and governance on asset
disposals, breakages, failure rates,
replacements etc
- Monitor refresh schedule to be developed and
implemented.
AV refresh schedule to be developed and
implemented
Storage and Back Up
Review/update record management policy, confirm
document management approach, tidy data in line with
RMP,
migrate data to central servers and then decommission
old servers;
explore back-up solutions for email and
drive/workspace, confirm solution
and implement.
- Define and agree upon reporting on data
utilisation / cleansing progress
- Formulate rules for deletion: age, impact on
records management obligations, size
- Centralise storage on centrally managed servers.
- Assess volume of storage required on the basis of
the outputs of the data cleanse process
- Assess options - servers held in high schools on
behalf of primaries vs servers held centrally on
behalf of all schools
- Procure and implement new hardware
- Migrate data from existing servers to new servers
Security
Identify a solution/tools MDM, DLP and Other to prevent
data from being
copied into a personal app. Investigate
& implement CASB, 2FA & Data
Classification within Workspace
- Identify Security work packages that need third
party support / procurement
- Identify MDM / DLP tools and solutions to prevent
data being copied out of the workspace onto
personal apps
- Investigate alternative inbuilt controls to overcome
MDM risks in non-Windows/Chrome user
environments
Page 70 of 106

Page 71

Network and Wifi
Develop Network Wi-Fi requirements, develop
Network/Wi-Fi forecast
model with scenario planning capability to proactively
plan capacity.
Wholesale update of Wi-Fi Network
- Deploy Lightspeed network
- Roll out Windows / Mac Lightspeed agent
- Deploy Network Agent Lightspeed DNS Proxy
in schools
- Roll out Lightspeed BYOD network
Audio Visual
Define how teachers could/should use Chromebooks
and AV  for each
type of learning setting. Define requirement for AV
service offering.
- Carry out focused engagement with teachers
to define use, requirements and board
selections
- Audit current estate
- Formulate scope and spec for Connected
Classroom as part of Innovation project work
- Deliver Connected Classroom pilot in six sites
- Conduct change management in all schools
- Procure all hardware through Scotland ESL
Framework
- Agree installation plan with chosen supplier
- Review support arrangements for software updates
- Carry out installation
Identity
Build a case for change, develop options assessment
and business case. Implement simpler corporate wide
identity solution to education
- Conduct a survey of outstanding issues
between AD and other environments - highlight
current pain points
- Consider policy and parameters relating to
access for third parties (eg Edinburgh
Chamber of Commerce, LEAPS, CLL, NHS)
and internal staff who need access to the
domain
- Review interim arrangement for managing issues
related to accounts and identities
- Implement identity solution
Support
Review support processes, where best placed to sit.
Update Service Now to allow Digital Learning access.
Confirm Governance process on managing and tracking
of assets.
- Review as-is resourcing model for support
activities and forecast to-be resource
requirements.
- Set up regular comms, reviews and
engagement processes between Digital
Learning staff, help desk staff, and
technologists
- Assess the viability of using Service Now to
deliver Digital Learning support functions
- Carry out trial run of Service Now for delivery of
support functions
- Carry out change management for migration to
Service Now
Potentially migrate Digital Learning support
functions to Service Now
Page 71 of 106

Page 72

02. Challenges and Risks
22/23:
- Outcome of the Education Reform Consultation and National Care Service Consultation
- Uncertainty about how SQA qualifications will be assessed going forward in the future.
- The continuing impact of the pandemic on attendance and on post-school destinations
- Midlothian Council has a relatively high proportion of funded ELC places delivered by partners in the private and voluntary sectors. As such, any increases in the rate that
is paid to funded providers would create additional upward pressure on the early years budget for 2022/23.
- Rate of demographic growth on the learning estate
- A full refresh of school roll projections and capacities has been undertaken to assess current and future demand. This work will inform and shape the Learning Estate
Strategy over the next 5 years.
- A number of schools funded through the Scottish Governments Learning Estate Investment Programme are at the briefing and design stages. There are council and
developer funded projects being undertaken also.
- The Roll Projection data will be checked and refreshed on a 6 month basis to ensure we have provided sufficient capacity in each catchment. There are a number of
schools with imminent capacity breaches.
- A programme of Suitability Surveys will be conducted in 2022 to ensure our Core Facts data is reflective of the current situation.
- The Place Directorate are conducting Condition Surveys in all schools assets.
- Increase in the number of children and young people with additional support requiring more specialist provision will require robust monitoring to ensure staffing and
specialist facilities meets level of needs
- There are a number of Scottish Government consultations, on issues such as school uniform and physical restraint, that are ongoing which may result in change in
education policies for this coming session and beyond.
- There is a financial challenge to deliver statutory services given the current budget gap.
- Due to the current financial climate there may be an impact on services as a result of the cost of living and increase in poverty.
Page 72 of 106

Page 73

Page 73 of 106

Page 74

Page 74 of 106

Page 75

Place Performance Report Quarter Three 2022/23
Place is where people, location and resources combine to create a sense of identity and purpose. The
Place service ambition is to deliver joined-up, collaborative, and participative approaches to services,
land and buildings, across all sectors within a place, enabling better outcomes for everyone and
increased opportunities for people and communities to shape their own lives.
Challenges
Over recent years, innovative ways of working have been introduced and services adapted at pace to
respond to the needs of our citizens, in particular those experiencing the greatest levels of poverty and
inequality. This has resulted in a complete transformation of how the Council works. Our services are
continuing to build on this learning moving forward, harnessing the energy, flexibility and creativity
demonstrated by our workforce, to embed a culture of continuous improvement and innovation across
Place.
Quarter 3 (October – December 2022) was a challenging quarter for Place as it continues to support post-
pandemic recovery, operate a business as usual approach to service delivery and progress a range of
transformation projects. 
Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is
currently experiencing unprecedented adverse market conditions, leading to significant rises in tender
prices for a wide range of materials. There is evidence that inflation of between 10% and 15% beyond BCIS
predictions is affecting projects. Whilst measures such as value engineering are partially mitigating cost
increase there is a risk that the capital budgets will need to be increased with a resultant impact on the
funding strategy. The situation continues to be monitored however it is necessary to revisit existing capital
plans and also review the 2022/23 service budgets and implement savings measures in the year.
Environmental
Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change Declaration,
publicly acknowledging the challenges and opportunities that climate change brings with a commitment to
make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate
Change Strategy and focus continues within Place services to achieve future emissions targets.  The
ambitious strategy sets out how we will reduce our greenhouse gas emissions, encourage and work with
others in our community to mitigate and adapt to changing climate. The strategy incorporates an action
plan with a number of initiatives and ongoing programmes which together are helping to reduce our
emissions and carbon footprint. The annual progress report on Climate Change was presented to Cabinet
at its meeting of 18 October 2022.
Economic Development continues to promote the Midlothian Carbon Pledge. As of Q3 there are now 41
businesses committed to the Carbon Pledge, which is now a prerequisite for any businesses looking to
secure grant support from the LACER Green fund. Economic Development are working with the pledgers
to identify the best platform for group sharing, enabling the sharing of experiences, ideas and peer
support. 
Performance, Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.6
Page 75 of 106

Page 76

Work continues with Midlothian Energy to develop business case options for addressing building fabric
and energy decarbonisation of the existing estate. The planned site has been secured for the new
Midlothian Energy Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair.  The
energy services agreement with Shawfair LLP received shareholders consent in December allowing closure
of the deal to supply and manage heat distribution for Shawfair. The conclusions of the heat offtake
agreement at Millerhill waste and recycling plant allowed the signing of the design and build and operating
and management agreements for the energy centre and undertaking of the installation of the distribution
network. Contractors are now appointed and work progressing.  
During Q3 we ran a consultation on our Electric Vehicle charging network to gather feedback on providing
accessibility, reliability and affordability of a charging network across the Midlothian area.  The
consultation will shape our Electric Vehicle Infrastructure strategy and expansion plan for 2023. A business
case has been developed and considers the expected future increase in EVs and associated need for
additional chargers throughout Midlothian. It also sets out possible funding options and what the future
EV charging network could look like. 
Successful delivery of the first 9 weeks of the winter service was delivered through a challenging severe
weather period due to widespread snow followed by a deep freeze in December. 4,303 hours of resource
was spent in response, including collaborative working with land services, positive testing of our resilience
levels for plant, resource and salt. 
The annual Capital Works Programme for carriageway resurfacing combined with the Residential streets
programme continues to make good progress this quarter with 15.26km of carriageway resurfaced over
Q1 to Q3 (2.2% of the total road network) with our annual target of resurfacing 2.2% of the total road
network being achieved. In addition 3.03km of footways were resurfaced to the end of this quarter
(0.43%), meeting our target for this quarter and expected target to be met for the year.  
Successful procurement of new contracts for both lighting capital and traffic signal maintenance will
deliver best value for the service. Funding has been diverted to the delivery of 1,796 new LED lanterns and
151 lighting column replacements in 22/23 due to late procurement of these contracts
Community benefit fund from Leavenseat Recycling Centre was awarded to Loanhead Bike Refurbishment
project, allowing the purchasing of spares to repair bikes for reuse, as well as bike maintenance. The “Sew
Far so Good” project in Glencourse Centre in Penicuik is supporting local residents to mend and repair
clothes and to Playbase, Dalkeith for support in operating the Bric-a-brac re-use cabin at Stobhill. The re-
use cabin for the collection of household bric-a-brac for “play through learning” was opened this quarter. 
The kerbside garden waste collection season was extended to offer an additional collection to customers
whose service was affected by Industrial Action. For 2023, a total of 18,680 householders have subscribed
to the service with a total of 19,686 bins.
This quarter, the Waste Services team began working on an options Appraisal with Zero Waste Scotland to
consider how waste/recycling might be collected in the future considering the Household Waste Charter,
and the impacts of both the Deposit Return Scheme and Extended Producer Responsibility.
Land and Countryside project work has been progressing well this quarter. Play areas at Danderhall and
Kings Park Nursery have now been completed with new play equipment and planting. Waterfall park
Page 76 of 106

Page 77

refurbishment is now complete and North Middleton Pump Track Pump track completed and is being well
used by community. Dalhousie Mains, one of our large soft landscaping projects, is near completion. Other
works in progression include Burnbrae primary, Penicuik park, Millerhill park. 
The Countryside Ranger Service continues to engage with communities and volunteers on various
initiatives such as the Midlothian Outdoor Festival, attracting 1,072 visitors taking part in walks, talks and
activities throughout the county. Tree survey work was completed on Penicuik to Dalkeith walkway,
Springfield Mill and Straiton pond. Up to Q3, 4,212 volunteer hours were spent in countryside sites. In
addition, the ranger service secured partnership funding with Scottish Water for a ranger post at
Gladhouse reservoir and delivery of equipment as part of the Scottish Government Nature Restoration
Fund for biodiversity which will be utilised for maintenance of grassland and wild flower meadows. 
Public Health and Environmental Protection have successfully implemented the short-term let licensing
scheme within the time scales prescribed by Scottish Government.  To date only a handful of applications
have been received but plans are in place to proactively contact known short-term let hosts early this year
to remind them of the deadline for their license application and publicise the scheme further on our social
media platforms. 
Air Quality Progress Reports for 2020-21 and 2021-22 were submitted to Scottish Government on 31st
October 2022 for appraisal.  Our Air Quality monitoring programme which had been suspended due to
resourcing issues has been successfully restarted with Edinburgh Scientific Services changing the Nitrogen
Dioxide (NO2) tubes on our behalf.  This work is done for us at no additional costs as part of our contact
with the lab. 
The vast majority of animal welfare licensing visits have taken place in November and December
2022.  This has meant, where the license fee has been paid, the license for 2023 has been granted prior to
expiry of the 2022 license.  The remaining licensing visits will be concluded early in 2023. 
An Abandoned Vehicle Procedure, introduced during 2022, continues to be refined this quarter but is
working well. Officers are having a lot of success in contacting owners early in the process prior to having
to go to formal notice by affixing ‘awareness’ notices at their first visit to the vehicle which encourages the
owners to contact us. This allows the owner to informally deal with the issue before moving to formal
notice. 
The Protective Services Business Regulation team hosted a number of visitors who were keen to better
understand our roles in food safety and public health, building relationships for effective joint
working.  This included deputy CEO of Food Standards Scotland and a Clinical Fellow from the Health
Protection Team. In addition, the Business Regulation Team has been working with an Environmental
Health contractor to carry out our lowest risk food premises inspections. This has allowed the team to
progress the backlog of food inspections after all inspection work ceased due to COVID restrictions. 
Economy & Regeneration
Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to managing the
transition from lockdown and planning for the longer term challenges the local economy will face. The
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims
are to protect jobs and aid business recovery using a place based partnership approach that maximises
Page 77 of 106

Page 78

the opportunities developing from the pandemic. Taking this partnership approach, the strategy will
foster entrepreneurship, upskilling and training, addressing gaps in the market and changing the way
business is done to better align this to customer behaviour. Alongside support for agriculture, tourism
and the leisure and hospitality sectors, the council will also promote local jobs and self-employment
opportunities, particularly for young people, to give them the necessary skills and support they need to
benefit from economic recovery. A report on EU-Exit impacts and the economy was presented to Council
in October and work has commenced with Ekosgen which will inform the refresh of the Economic
Strategy to be presented for approval to Council in early 2023.
In addition, the Local Authority Covid Economic Recovery Fund (known as LACER) provides grants to
support businesses, social enterprises and tourism in Midlothian. Funding allocation has been spilt across
the following areas: 
• Business Associations £15,000
• Social Enterprise Start and Grow fund £80,000
• Tourism, Culture & Heritage Officer £43,859
• Tourism Support £10,000
• Green Transition Fund £249,922
The Business Gateway team continue to promote localised procurement with clients and have made 6
referrals to the Supplier Development Programme. The team continue to promote opportunities via our
digital channels and clients are contacted directly if they suit a specific business.
Social enterprise enquiries are received via the Business Gateway service who promote the model to
clients with plans where the objectives and values align to the social enterprise model. Plans are in place
for the virtual delivery of community enterprise sessions across Midlothian in 2022/23 contributing to
Community Wealth Building objectives and the team continue to support the projects from Social
Enterprise Conversation sessions as they develop. The “Newtongrange Development Trust and a Social
Entrepreneur” session was held in Q3. 
The Locate in Midlothian website continues to be a valuable tool for employability opportunities and
employment support with 23 property enquires received via the site during Q3, all enquirers contacted by
Business Gateway advisors to offer wider support.  In total the team have received 119 enquires. The
Locate in Midlothian website received 1,458 visits from 1st of Oct to 10th to November. (It should be noted
that website visits are expected to be significantly higher across the quarter but due to a switch in
software during the quarter reporting issues are being progressed with the developer). Each social media
channel is targeting different audiences and each is performing well in terms of audience growth and
interaction with 1,767 ‘Business Gateway Midlothian’ followers and 1,621 ‘Locate in Midlothian’ followers
across Facebook, Twitter and Linkedin.  
The level of Business start-ups took a significant drop in Q2 (with 6 start ups) but has recovered this
quarter (26 start ups). New client reasons for starting up include: 
• Part time work sufficient before but not during cost of living crisis
• Developing in order to create additional income to cover gaps in earnings, whilst remaining in
employment
Page 78 of 106

Page 79

• Redundancies or threat of job loss motivating clients to investigate self-employment
Most of the start-ups that Business Gateway work with are either self-employed (sole traders/gig
economy), or setting up a micro enterprise (employ <10) or as a social enterprise. All business types are
finding it challenging to access funding in the current economic conditions which is a key element in the
community wealth building approach; to support individuals and grass roots organisations develop and
prosper. The transition to a wellbeing economy is dependent upon organisations and communities having
access to grants and loans. We are fortunate that we have a small start-up fund and the lacer social
enterprise funds at present however it should be noted that those seeking to set up a micro enterprise are
likely to require access to larger amounts via the Start-up Loan fund or Business Loan Scotland and the
cost of living crisis is having an impact on their borrowing ability as personal outgoings increase.
In addition, start-up businesses are reporting increasing difficulties in accessing funds, including those
backed by the UK Government with credit assessments are becoming more rigorous. Established
businesses have reported difficulty in accessing lending from mainstream providers too, restricting their
opportunities for growth. This is both within the mainstream and third sector. Consideration in
Midlothian’s Community Wealth Building plan should be access to low cost borrowing/seed funding for
businesses and social enterprises with a clearly defined income generation model. 
We have continued to maximise opportunities to support recovery of the tourism sector by supporting the
development of the tourism forum’s digital presence and representation on the steering group. A £10,000
grant to the Midlothian Tourism Forum will allow the forum to design and build a website to increase
membership and interest. The new Economic Strategy planned for 2023 approval will include Tourism,
Culture and Heritage.  
Whilst work is progressing to develop proposals for the Hopefield Economic Development site, the
acquisition of Hardengreen H1 and H2 Economic development sites was concluded in Q3 providing mixed
Industrial and office spaces. This represents a further expansion and diversification in the style and size of
units the Council will be able to make available to support growing Midlothian enterprises.  
At its meeting in October 2022 the Planning Committee approved an Enforcement Charter which sets out
the Council’s approach to investigating and resolving breaches of planning control. At its meeting in
November 2022 the Planning Committee determined to grant planning permission for two strategic
planning applications; the first for the erection of 96 dwelling houses and associated works at Newbyres
Site B, River Gore Road, Gorebridge and the second for the erection of a Farmfoods foodstore retail unit
and associated works at 18-20 Edinburgh Road, Penicuik.  
Housing and homelessness
Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) sets out key actions for delivery in
22/23 and addresses the next phase in transforming the services provided to meet housing need. These
activities are crucial to reduce the time spent in temporary accommodation, improving the quality of
temporary accommodation provided, continue to deliver Housing First and improve the health and
wellbeing of those most vulnerable households. The plan also explains how Midlothian Council will
address the next phase of its approach to transforming the services provided to those in housing need by
developing other initiatives during 2022/23 and into 2023/24, with an emphasis on the prevention of
homelessness, tenancy sustainability and early intervention. 
Page 79 of 106

Page 80

There continues to be a significant demand placed on homeless and temporary accommodation services.
A potential key challenge will be an increase in homelessness as the financial measures put in place to
protect households during the Covid pandemic are now withdrawn, alongside the recent increase in
energy, food and fuel costs, requiring a comprehensive preventative approach as set out in the Council’s
Rapid Rehousing Transition Plan. 
The number of applicants requiring temporary accommodation has increased this quarter to 140 new
cases, reaching a total number of households in temporary accommodation at 362. The number of cases
provided with advice and assistance in Q3 was 226 and 77 clients were prevented from homeless by
accessing advice and assistance. We continue to promote this service to ensure early successful
intervention when possible. There were 4,628 active housing applicants placed on the Common Housing
Register at the end of this reporting period. Re-let time for permanent properties has decreased to 25 days
this quarter compared to 45 days for Q1 and 36 day in Q2. The length of time homeless applicants wait
until receiving a permanent housing outcome has decreased to 76 weeks from 121 in Q2. 
The first year review of the Homeless Prevention Forum took place this quarter.  This is a partnership
arrangement established 2021, with an aim to reduce children going into homelessness through
evictions.  Referrals are triggered when there is risk of eviction via the arrears and housing services teams
within Midlothian Council.  
Homelessness Officers ensure the necessary partnerships and protocols are in place to plan for addressing
the housing needs of people leaving institutions by delivering a Personal Housing Planning approach for
vulnerable groups, which contributes to the prevention of homelessness, including those subject to Multi-
Agency Public Protection Arrangements (MAPPA) and Multi Agency Risk Assessment Conferences
(MARAC). 
This quarter the Scottish Housing Regulator met with Housing Services to review and discuss our
engagement plan surrounding homelessness and health and safety within our tenancies. In addition, the
Scottish Housing Network concluded a benchmarking exercise against similar sized Local Authority Housing
teams.  Both meetings praised our material improvements around housing and homelessness and
supported the continuation of engagement going forward.  
During this quarter we have worked to better improve communications with our housing applicants and
tenants, housing duty telephone lines were moved onto Liberty telephony system allowing call recording
and ability to report on call handling performance. New private meeting room spaces were opened in
Midlothian House for customer engagement. As part of the Midlothian Council rent consultation which
presented options for all tenants and waiting list applications on setting next year’s sent levels, a series of
five public meetings were held across various locations in Midlothian which were promoted by staff, social
media and text messaging.  
Work continues as part of the resettlement scheme to support and provide routes for people who may be
fleeing conflict from a range of different countries. This includes, Afghan Resettlement Schemes, the
Homes for Ukraine Scheme which provides a range of routes for people fleeing the conflict in Ukraine and
the Asylum Dispersal Programme through which people seeking asylum are provided with accommodation
in specified nations. The main activities this quarter are, our third Military of Defence sub-let property in
Milton Bridge and we have transformed two small hostels into large family accommodation in Dalkeith. 
Page 80 of 106

Page 81

We have worked with Social Work Children and Families to support with responsibilities around
Unaccompanied Asylum Seeking Children. 
Specialist Housing projects: Housing First has supported 38 individuals to date.  We have accommodated
our first Veteran from our new Forces nomination agreement in Penicuik.  The National Housing Project
has provided six properties for young persons in 2022.  
As part of Midlothian Council’s Tenant Participation and Customer Engagement Strategy, Midlothian
undertakes annual surveys to determine the level of tenant satisfaction within Housing services provided
by the Council. Survey feedback was received this quarter with 81.5% of council tenants satisfied with
services overall during 2022. The next steps will include the delivery of focus groups to gather further
feedback on two key themes:
• How tenants can work with the Council to assist in the improvement of areas of the repair services,
to improve overall customer satisfaction levels.
• Further steps can be explored to improve customer satisfaction levels to ensure tenants feel more
informed about their services and also have the opportunity to participate in the future
development and delivery of these services.
Capital programme
As Scotland’s fastest growing local authority area, it is critical to delivery that investment in community
infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living
patterns brought about by the COVID-19 pandemic. Communities need to be able to readily access the
services they require. Capital investment is also an opportunity to support our local economy through job
creation and skills enhancement, particularly in relation to supporting a transition to a green economy as
we invest in sustainable, highly energy efficient buildings.
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how
we live now. We will invest in community infrastructure with a focus on place-making, reducing
inequalities, improving economic opportunities and improving education and health and wellbeing
outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our
past successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of
Midlothian and its citizens.
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so
has to reflect the demands of Council services to ensure positive outcomes are achieved in the right place,
at the right time for the maximum benefit to Midlothian.  The extensive capital programme, totalling
£0.8bn, delivers new schools, a record investment in council housing, improved community infrastructure,
investment in the local transport network and innovative developments such as the new low carbon heat
network in Shawfair. 
Page 81 of 106

Page 82

To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship
opportunities, opportunities for businesses and communities and families hard-hit by the impact of
COVID-19. These new opportunities help lead the way out of the pandemic and towards a better future for
Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular
review meetings with Education and stakeholders to ensure effective monitoring, reporting and
delivery of improvement and expansion of the Education estate including Early Years provision. This
currently covers approximately 30 projects at various stages of development. 
Midlothian Council is overseeing a significant housing programme. Phase 1, now complete, provided
864 additional houses within Midlothian. The total number of new homes from phase 2, 3 and 4 is
currently estimated at 1201, comprising of 489 from phase 2 budget and 712 from phase 3 and 4
budgets. Progress during 2022 continues with 661 homes currently being constructed on site either
through commencement of enabling works or main contract works as of November 2022. This includes
the largest Passivhaus programme in Scotland, with 189 homes to be built to the exacting Passivhaus
standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures exceptionally
high levels of energy efficiency and low utility bills for our residents. 
Growing Council
In addition to the financial sustainability challenge referenced earlier, other challenges for Midlothian
continue with our recovery out of the pandemic, the cost of living crisis, the growing and ageing
population and the increasing demand for services that this brings. 
Midlothian is projected to have the highest percentage change in population size of all mainland council
areas in Scotland. From 2018 to 2028, the population of Midlothian is projected to increase from 91,340 to
103,945. This is an increase of 13.8%, which is in contrast to a projected increase of 1.8% for Scotland as a
whole, with a 40.9% increase in older people over 75. In addition, Midlothian has 10 zones which falls into
the most deprived areas giving a local share of 8.7% living in the most deprived areas in Scotland. 
This growth creates the opportunity to meet the housing need with 25% of new homes being built in the
affordable housing bracket, in addition to the expansion in Council house building. This construction will
directly support employment and will see a steady increase in the value of Council Tax income received
over time. 
The approved Capital Strategy sets out the infrastructure required to meet those demographic pressures
and includes the financial contributions Midlothian will make to the Edinburgh and South East Scotland
City Region Deal. Encompassing five main themes the City Region Deal will bring significant investment
across the regions with total investment of circa £1.3 billion across: 
• Research, Development and Innovation: £751 million
• Integrated Regional Employability and Skills: £25 million
• Transport: £156 million
• Culture: £45 million
• Housing: £313 million
Page 82 of 106

Page 83

Through the Data Driven Innovation strand the Deal will leverage existing world-class research institutes
and commercialisation facilities in order that Easter Bush becomes a global location of Agritech excellence.
The Easter Bush project includes significant investment in transport infrastructure along the A701/2
transport corridor. In addition, by improving on-site infrastructure at Easter Bush and transport
infrastructure, The University of Edinburgh expects commercial partners will be able to co-locate at scale
to commercialise Agritech breakthroughs. 
Page 83 of 106

Page 84

Page 84 of 106

Page 85

Appendix A
Page 85 of 106

Page 86

Building Services 
Continue to deliver the Building Standards continuous improvement plan which forms part of the nationally adopted performance
framework and is submitted to the Scottish Government. 
Continue to deliver the additional programmes of work identified by the house condition surveys to maintain Scottish Housing
Quality Standard for the Councils housing stock. 
Deliver the Energy Efficiency Standard for Social Housing (EESSH) programme. 
Continue to improve the delivery of Building Maintenance services through the review of mobile working, process improvements,
income and productivity. 
Implementation of the Local Authority Carbon Management Plan and General Services Capital programme. 
Key highlights 
Building Standards continues to provide a high level of customer satisfaction against an increasing demand by co-ordinating working arrangements with partners, monitoring
performance, identifying any dips, publishing information on this together with any remedial action, identifying customer needs and ensuring appropriate resources are available
to meet those needs. . In December the Building Standards service was awarded its full re-appointment period by the Scottish Government. This re-appointment period is from 1
May 2023 until 30 April 2029. Although a positive this reappointment is subject to the following terms;
 The six year appointment period is conditional on the ability of Midlothian Council’s building standards service to sustain and improve performance and ensure there is
no reversal of performance or investment levels.
 Sufficiently resourcing the service to ensure workforce supply will meet longer term demand projections to maintain operational resilience. 
In relation to our ambitious affordable housing programme, Phase 1, now complete, provided 864 additional houses within Midlothian. The total number of new homes from
phase 2, 3 and 4 is currently estimated at 1201, comprising of 489 from phase 2 budget and 712 from phase 3 and 4 budgets. Progress during 2022 continues with 661 homes
currently being constructed on site either through commencement of enabling works or main contract works as of November 2022. This includes the largest Passivhaus
programme in Scotland, with 189 homes to be built to the exacting Passivhaus standard, in line with Midlothian Council’s Net Zero Housing Design Guide. This ensures
exceptionally high levels of energy efficiency and low utility bills for our residents. 
Grant Funding of £696,497 for 2022/23 Energy Efficiency has been awarded and contracts have been awarded for the extension of the Cameron Crescent and Ladywood areas of
Midlothian. Two contracts for a combined total of £1.6m for roughcasting of social housing have been awarded and are ongoing in the Dalkeith and Newtongrange areas. 
Areas of improvement: Due to changes in the Energy Efficiency regulations affecting the Scottish Housing Quality Standards (SHQS) criteria, 431 houses have been identified as
failing the Energy Efficiency Standard for Social Housing (ESSH). We have reduced these failures to 160 to meet the 2025 targets. However, with the Electrical Installation Condition
Reports (EICR’s) now part of the SHQS from the 31st March 2022 we have found that 4733 fail assessment and have 34.3% meeting standard. It should be noted that 100% of
smoke alarms comply with current legislation. Contracts are in process to address the EICRs and 160 properties for EESSH failure.   
Holistic
Modern
Sustainable
Preventative
88.71%
93.92% 93.51%
91.6%
94.26%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of completed first priority
repairs within target of 24hrs
93% 96% 94% 96.2% 96.4%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Satisfaction % relating to key areas
in Building standards including
those on delivery, timeliness,
information, access and the quality
of customer service
Target (90%)
98.9% 98.9% 98.9% 98.9% 98.9%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of the Councils housing stock
meeting the 'Free from serious
disrepair' Scottish Housing
Quality Standard criteria
Target (100%)
87.70%88.34%
85.96%
87.13%
93.87%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of completed second
priority repairs within target of
7 days
Page 86 of 106

Page 87

Property and Facilities
Management
Develop carbon reduction targets for Council properties and support of sustainable low carbon energy targets and district heating
schemes. 
Support the delivery of the Economic Renewal Strategy through the letting and sale of Property Investment Account properties. 
Lead the acquisition and disposal of identified sites in Capital and Local Plans, Learning Estate and Housing programmes and the climate
change agenda. 
Continue to deliver Building Rationalisation and hybrid working. 
Maintain compliance and review Health and Nutrition of school meals in accordance with new Scottish Government legislation.  
Increase revenue throughput the commercial sector of catering services. 
Continue to provide a catering and facilities service that reacts to, and meets the requirements of the Early Years expansion programme. 
Continue to improve the facilities and cleaning services by introducing new cleaning practices and methodologies. 
Asset based
29,380
36,725
24,860
12,430
29,380
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Total hours used for cleaning
in primary schools
16,972
21,216
14,388
7,180
16,972
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Total hours used for cleaning
in secondary schools
14,877
18,596
12,588
6,294
14,877
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Total hours used for Janitorial
services in schools
Key highlights
Whilst work is progressing to develop proposals for the Hopefield Economic Development site in conjunction with the Development, the acquisition of Hardengreen H1
and H2 Economic development sites was concluded in Q3 providing mixed Industrial and office spaces. This represents a further expansion and diversification in the
style and size of units the Council will be able to make available to support growing Midlothian enterprises.   
Work continues with Midlothian Energy to develop business case options for addressing building fabric and energy decarbonisation of the existing estate. The planned
site has been secured for the new Midlothian Energy Centre at Millerhill, as a key step in the delivery of District Heating at Shawfair.  The energy services agreement
with Shawfair LLP received shareholders consent in December allowing closure of the deal to supply and manage heat distribution for Shawfair. The conclusions of the
heat offtake agreement at Millerhill waste and recycling plant allowed the signing of the design and build and operating and management agreements for the energy
centre and undertaking of the installation of the distribution network. Contractors are now appointed and work progressing. 
Asset management: Approval and sign off the appointment of framework Surveyors to undertake non housing stock Condition Surveys. Although delayed this work will
now commence early 2023. 
Janitorial, Cleaning & Catering: A total of 320,348 schools meals were provided during quarter 3 for nursery, primary and secondary schools. Cleaning Services continue
to provide enhanced cleaning, fogging, touchpoint cleaning and additional Janitorial support across all Council Buildings. 
Areas for improvement: 
International instability are impacting on energy prices and Midlothian current reliance on Carbon based fuel and lack of historical investment in alternative energy
sources makes us potentially vulnerable to increasing and fluctuation prices. Current framework contract agreements are currently protecting the Council from
significant increases. We continue to monitor usage but this will be an ongoing challenge, with the need to also invest in fabric improvements and Net Zero also
presenting a corresponding technical, financial and resource challenge.
Page 87 of 106

Page 88

Housing
Increase the number of homeless households that obtain permanent accommodation, and half the average time taken to complete homeless
duty from 105 weeks to 52 weeks. 
Implement Midlothian Council’s Allocation Policy. 
Implement the approach to housing those with complex needs through a ‘Housing First’ model. 
Review void management to minimise re-let timescales and further development of our tenancy support to improve the sustainability of
tenancies. 
Introduce a new strategy to reduce drug deaths within Midlothian homelessness accommodation. 
Key highlights 
This quarter the Scottish Housing Regulator met with Housing Services to review and discuss our engagement plan surrounding homelessness and health and safety
within our tenancies. In addition, the Scottish Housing Network concluded a benchmarking exercise against similar sized Local Authority Housing teams.  Both meetings
praised our material improvements around housing and homelessness and supported the continuation of engagement going forward.  
During this quarter we have worked to better improve communications with our housing applicants and tenants, housing duty telephone lines were moved onto Liberty
telephony system allowing call recording and ability to report on call handling performance. New private meeting room spaces were opened in Midlothian House for
customer engagement. As part of the Midlothian Council rent consultation which presented options for all tenants and waiting list applications on setting next year’s sent
levels, a series of five public meetings were held across various locations in Midlothian which were promoted by staff, social media and text messaging.   
The number of applicants requiring temporary accommodation has increased this quarter to 140 new cases, reaching a total number of households in temporary
accommodation at 362. The number of cases provided with Advice & Assistance in Q3 was 226 and 77 clients were prevented from homeless by accessing advice and
assistance. We continue to promote this service to ensure early successful intervention when possible. There were 4,628 active housing applicants placed on the Common
Housing Register at the end of this reporting period. Re-let time for permanent properties has decreased to 25 days this quarter compared to 45 days for Q1 and 36 day in
Q2. The length of time homeless applicants wait until receiving a permanent housing outcome has decreased to 76 weeks from 121 in Q2. 
The first year review of the Homeless Prevention Forum took place this quarter.  This is a partnership arrangement established 2021, with an aim to reduce children going
into homelessness through evictions.  Referrals are triggered when there is risk of eviction via the arrears and housing services teams within Midlothian Council.   
Work continues as part of the resettlement scheme to support and provide routes for people who may be fleeing conflict from a range of different countries. This
includes, Afghan Resettlement Schemes, the Homes for Ukraine Scheme which provides a range of routes for people fleeing the conflict in Ukraine and the Asylum
Dispersal Programme through which people seeking asylum are provided with accommodation in specified nations. The main activities this quarter are, our third Military
of Defence sub-let property in Milton Bridge and we have transformed two small hostels into large family accommodation in Dalkeith.  We have worked with Social Work
Children and Families to support with responsibilities around Unaccompanied Asylum Seeking Children.
Holistic
Modern
Hub and Spoke
One size fits one
232
211
226
Q1 22/23 Q2 22/23 Q3 22/23
Number of clients accessing
homelessness advice and
assistance
96
112 114
Q1 22/23 Q2 22/23 Q3 22/23
Total number of housing lets
52
39 45
36
25
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Re-let time permanent
accommodation properties
(calendar days)
Target (35 days)
99 85 106 121
76
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Length of time (weeks)
homeless applicants wait until
receiving a permanent housing
outcome
Target (85 weeks)Page 88 of 106

Page 89

Neighbourhood Services 
Transform service delivery through the adoption of digital and mobile platforms. 
Improve and expand active travel and public transport for Midlothian residents. 
Continue to progress actions to reach the Scottish Government targets to recycle 70% of all waste. 
Develop a comprehensive asset database management plan for all Neighbourhood Services assets.  
Continue to invest in the workplace across all Neighbourhood Services teams to develop sustainable career pathways and generic
working model to grow talent and foster leadership opportunities. 
Key highlights 
The annual Capital Works Programme for carriageway resurfacing combined with the Residential streets programme continues to make good progress this quarter with
15.26km of carriageway resurfaced over Q1 to Q3 (2.2% of the total road network) with our annual target of resurfacing 2.2% of the total road network being achieved. In
addition 3.03km of footways were resurfaced to the end of this quarter (0.43%), meeting our target for this quarter and expected target to be met for the year. 
Successful procurement of new contracts for both lighting capital and traffic signal maintenance will deliver best value for the service. Due to late procurement of these
contracts funding has been diverted to the delivery of 1,796 new LED lanterns and 151 lighting column replacements in 22/23. 
Community benefit fund from Leavenseat Recycling Centre was awarded to Loanhead Bike Refurbishment project, allowing the purchasing of spares to repair bikes for
reuse, as well as bike maintenance. The “Sew Far so Good” project in Glencourse Centre in Penicuik is supporting local residents to mend and repair clothes and to Playbase,
Dalkeith for support in operating the Bric-a-brac re-use cabin at Stobhill. The re-use cabin for the collection of household bric-a-brac for “play through learning” was opened
this quarter. 
Land and Countryside project work has been progressing well this quarter. Play areas at Danderhall and Kings Park Nursery have now been completed with new play
equipment and planting. Waterfall park refurbishment is now complete and North Middleton Pump Track Pump track completed and is being well used by community.
Dalhousie Mains, one of our large soft landscaping projects, is near completion. Other works in progression include Burnbrae primary, Penicuik park, Millerhill park. 
The Countryside Ranger Service continues to engage with communities and volunteers on various initiatives such as the Midlothian Outdoor Festival, attracting 1,072
visitors taking part in walks, talks and activities throughout the county. Tree survey work was completed on Penicuik to Dalkeith walkway, Springfield Mill and Straiton pond.
Up to Q3, 4,212 volunteer hours were spent in countryside sites. In addition, the ranger service secured partnership funding with Scottish Water for a ranger post at
Gladhouse reservoir and delivery of equipment as part of the Scottish Government Nature Restoration Fund for biodiversity which will be utilised for maintenance of
grassland and wild flower meadows. 
Areas for improvement: This quarter, the Waste Services team began working on an options Appraisal with Zero Waste Scotland to consider how waste/recycling might be
collected in the future considering the Household Waste Charter, and the impacts of both the Deposit Return Scheme and Extended Producer Responsibility.
Holistic
Sustainable
Preventative
One size fits one
45.1%
47.5%
51.9%
48.2%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
% of total household waste that
is recycled (Tonnes)
Target (54%)
0.93%
2.05%
0.34%
1.38%
2.20%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of the road network
resurfaced (cumulative)
Revised Annual Target (2.2%)
411
702
0 0 5
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of lighting columns
replaced (cumulative)
Annual Target (151)
0.34%
0.54%
0.12%
0.27%
0.43%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
% of the footpath network
resurfaced
Annual Target (0.60%)
Page 89 of 106

Page 90

Planning and Economy
Achieve the aims set out in the Planning Performance Framework (PPF)
Continue to embed the Climate Change Strategy and deliver against the action plan. 
Implement year 3 of a 5 year Penicuik Heritage project which delivers public realm improvements and investment in heritage assets in the town
centre 
Draft and adopt supplementary guidance on the ‘Quality of Place’ which will be used as a tool to enhance place-making within Midlothian 
Draft and adopt supplementary guidance on ‘Developer Contributions’ which will be used as a tool to secure financial contributions towards
infrastructure to meet the demands arising from new development 
Implement the statutory requirements of the new Planning Act 2019 which places additional burdens onto the Planning Service
Deliver on the objectives identified in the Strategy for Growth 2020-25 
Maintain and grow the client reach of Business Gate way services in Midlothian and continue to develop locate in Midlothian 
Key highlights
The Business Gateway team continue to promote localised procurement with clients and have made 6 referrals to the Supplier Development Programme. The team
continue to promote opportunities via digital channels and clients are contacted directly if they suit a specific business. 
Social enterprise enquiries are received via the Business Gateway service who promote the model to clients with plans where the objectives and values align to the social
enterprise model. Plans are in place for the virtual delivery of community enterprise sessions across Midlothian in 2022/23 contributing to Community Wealth Building
objectives and the team continue to support the projects from Social Enterprise Conversation sessions as they develop. The “Newtongrange Development Trust and a
Social Entrepreneur” session was held in Q3. 
The level of Business start-ups took a significant drop in Q2 (with 6 start ups) but has recovered this quarter (26 start ups). Most of the start-ups that Business Gateway
work with are either self-employed (sole traders/gig economy), or setting up a micro enterprise (employ <10) or as a social enterprise. All business types are finding it
challenging to access funding in the current economic conditions which is a key element in the community wealth building approach; to support individuals and grass
roots organisations develop and prosper. The transition to a wellbeing economy is dependent upon organisations and communities having access to grants and loans. We
are fortunate that we have a small start-up fund and the lacer social enterprise funds at present. 
The Locate in Midlothian website continues to be a valuable tool for employability opportunities and employment support with 23 property enquires received via the site
during Q3, all enquirers contacted by Business Gateway advisors to offer wider support. 
At its meeting in October 2022 the Planning Committee approved an Enforcement Charter which sets out the Council’s approach to investigating and resolving breaches
of planning control. At its meeting in November 2022 the Planning Committee determined to grant planning permission for two strategic planning applications; the first
for the erection of 96 dwelling houses and associated works at Newbyres Site B, River Gore Road, Gorebridge and the second for the erection of a Farmfoods foodstore
retail unit and associated works at 18-20 Edinburgh Road, Penicuik. 
Sustainable
Preventative
Holistic
Hub and Spoke
31
38
23
6
26
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Number of new Business start
ups (LGBF)
79% 80% 66% 80% 85%
Q3
21/22
Q4
21/22
Q1
22/23
Q2
22/23
Q3
22/23
Determine 80% of planning
applications within target (2
months for a local application
and 4 months for a major
application)
Target (80%)
Locate in Midlothian website: 1,458 visits (1st of Oct to
10th to November). 
1,767 ‘Business Gateway Midlothian’ followers and 1,621
‘Locate in Midlothian’ followers across Facebook, Twitter and
Linkedin.    Page 90 of 106

Page 91

g 
Protective Services  Continue to deliver the Council’s regulatory functions with respect to food hygiene and standards regulations
Regulate Health and Safety across Midlothian through the investigation of workplace accidents
Restart a programme of test purchase for under-age goods
Implement a robust business continuity management system and business continuity approach 
Continue to identify and respond to incidents of rogue trading  
Key highlights 
Public Health and Environmental Protection have successfully implemented the short-term let licensing scheme within the time scales prescribed by Scottish
Government.  To date only a handful of applications have been received but plans are in place to proactively contact known short-term let hosts early this
year to remind them of the deadline for their license application and publicise the scheme further on our social media platforms. 
Air Quality Progress Reports for 2020-21 and 2021-22 were submitted to Scottish Government on 31st October 2022 for appraisal.  Our Air Quality monitoring programme
which had been suspended due to resourcing issues has been successfully restarted with Edinburgh Scientific Services changing the Nitrogen Dioxide (NO2) tubes on our
behalf.  This work is done for us at no additional costs as part of our contact with the lab. 
The vast majority of animal welfare licensing visits have taken place in November and December 2022.  This has meant, where the license fee has been paid,
the license for 2023 has been granted prior to expiry of the 2022 license.  The remaining licensing visits will be concluded early in 2023. 
An Abandoned Vehicle Procedure, introduced during 2022, continues to be refined this quarter but is working well. Officers are having a lot of success in
contacting owners early in the process prior to having to go to formal notice by affixing ‘awareness’ notices at their first visit to the vehicle which encourages
the owners to contact us. This allows the owner to informally deal with the issue before moving to formal notice. 
The Protective Services Business Regulation team hosted a number of visitors who were keen to better understand our roles in food safety and public health,
building relationships for effective joint working.  This included deputy CEO of Food Standards Scotland and a Clinical Fellow from the Health Protection
Team. In addition, the Business Regulation Team has been working with an Environmental Health contractor to carry out our lowest risk food premises
inspections. This has allowed the team to progress the backlog of food inspections after all inspection work ceased due to COVID restrictions. 
Holistic
Preventative
Hub and Spoke
One size fits one
Please see report below for all Protective Service measures as part of reporting to the Police and Fire Board. Performance indicators marked with
* are part of our Place service plans and quarterly performance reporting.  
Page 91 of 106

Page 92

5 6
4
0
2
4
6
8
10
Q1 22/23 Q2 22/23 Q3 22/23
Number of Business
Workplace Health and
Safety proactive inspections
3
1 1
0
5
10
Q1 22/23 Q2 22/23 Q3 22/23
Number of Business
Workplace Health and
Safety Improvement notices
served
7
0
5
10
Q3 22/23
Number of Business
Workplace Health and
Safety accident
investigations
1 1 0
0
5
10
Q1 22/23 Q2 22/23 Q3 22/23
Number of Business
Workplace Health and
Safety Prohibition notices
served
64 64
0
10
20
30
40
50
60
70
Q3 22/23
Number of liquor licences
applied for granted
6 5
0
1
2
3
4
5
6
7
8
9
10
Q3 22/23
Number of public
entertainment licences
applied for granted
Licensing  Workplace Health and Safety 
Protective Services - Police and Fire Board Quarter 3 report
Other civic licences
applied for during
Q3:
1 Market Operator’s
Licence 
3 Tattoo Licences 
1 Window Cleaner
Licence 
3 Street Trader Licences 
1 Public Indoor Sport
Licence 
2 Second Hand Licences 
2 Second Hand Car
Dealer Licences 
Page 92 of 106

Page 93

273 243
0
50
100
150
200
250
300
Q3 22/23
*Number of Public Health
complaints
received responded to
30
4
0
5
10
15
20
25
30
35
Q3 22/23
Number of Abandoned Vehicles
reported notices served
2
0
0.5
1
1.5
2
2.5
Q3 22/23
Number of Abandoned Vehicles
which have been removed for
destruction
Public Health 
35
0
5
10
15
20
25
30
35
40
Q3 22/23
Number of Planning Application
consultations recieved  
1 Environmental Protection
Abatement notice was served
No private water supply
inspections took place this
quarter 
21 Licensing visits took place which
included:
1 Pet Shop Licences
4 Kennels
2 Catteries
1 Welfare Centres
3 Dog Day Care Centres
10 Home Border 
No private water supply
samples were obtained 
*Performance indicator forms part of our Place service plan and quarterly performance reporting.
Page 93 of 106

Page 94

Civil Contingencies  
Multi-agency Exercises, Training and Presentations:   
Team Members Participated in: 
 Exercise Eastern Hooley – East of Scotland Regional Resilience Partnership  (EoS RRP) severe
weather exercise. 
 Scottish Risk Assessment Challenge Workshop 1, Severe Weather.
 Scottish Risk assessment Challenge Workshop 2, Flooding, Drought and Food Supply.
 Airwave familiarisation sessions utilising designated handsets held by Police Scotland.
 Cyber Resilience Awareness Seminar. 
 Scottish Power Energy networks presentation on national procedure in the event of planned
outages. 
 Defence Contribution to Resilience course run by the military involving multi-agency
partners. 
 Planning for a Lothian and Borders CT exercise. 
 Inaugural meeting of Lothian and Borders LRP Short Term Working Group on National
Power Outage Framework. 
 Presentation by BT Openreach on the Analogue Switch Off. 
Team facilitated:
 Total of 7 attendees at the Nov and Dec 22 multi-agency Crisis Management Courses
organised by the EoS RRP. 
Returns to Scottish Government/Eos RRP/Lothian and Borders LRP (and
others), including: 
 Bunkered Fuel 
 Cyber Security 
 Resilient Telecommunications 
Monitoring of events and/or live incidents – disseminating information
internally and liaison with external organisations: 
 Weather 
 Avian Flu 
Plans and Procedures: 
Plans updated and issued:
 Midlothian Council Severe Weather Plan
 Straiton Area - Subsidence risk due to historical mining 
 Emergency Contacts Directory 
Plans updated and awaiting approval:
 Major Accident Hazard Pipelines 
 Torness Off-site Emergency plan – summary document for Midlothian Council 
Plans in progress:
 Op UNICORN as was now needs updating in respect of new Monarch.  Resources
in process of being replenished. 
Business Continuity Plans
Business continuity plans are generally the responsibility of individual services,
ongoing engagement and assistance is being provided to the following services to
transfer data to the Clearview software system: 
 Building Standards 
 Customer Services 
 Environmental Health 
 Facilities (including Catering) 
 Health and Safety 
 Trading Standards 
Page 94 of 106

Page 95

25 23
43
0
5
10
15
20
25
30
35
40
45
50
Q1 22/23 Q2 22/23 Q3 22/23
Number of planned public event
notifications received
37
19
15
0
5
10
15
20
25
30
35
40
Q1 22/23 Q2 22/23 Q3 22/23
Number of planned public events
presented at the Safety Advisory
Group
Public events 
Ongoing, routine representation at/participation in: 
 Local Resilience Partnership meetings – core group and sub groups. 
 Lothian and Borders CONTEST group. 
 COSLA “All Council” EU-Exit meetings. 
 Internal meetings requiring a Contingency Planning presence, including Care for People, estates Management, internal CONTEST Group, Safety Advisory Group, Business Continuity. 
To note: Following attendance at meetings, seminars, presentations, training sessions, a summary of all pertinent information is shared to senior managers and other colleagues as
appropriate and invitations to shared where the subject might be direct interest to other services/partners. 
Page 95 of 106

Page 96

3
0
4
0
1
2
3
4
5
Q1 22/23 Q2 22/23 Q3 22/23
Number of Food Hygiene
Improvement notices
served
4
1
2
0
1
2
3
4
5
Q1 22/23 Q2 22/23 Q3 22/23
Number of Food Law
Remedial Action notices
served
146
116
88
142
110
88
0
50
100
150
200
Q1 22/23 Q2 22/23 Q3 22/23
*Number of Food Law service
requests/complaints (food
safety and food standards)
received responded to
72
59
98
0
20
40
60
80
100
Q1 22/23 Q2 22/23 Q3 22/23
*Number of Food Law
interventions carried out
(food hygiene and food
standards)* 23
17
22
0
5
10
15
20
25
Q1 22/23 Q2 22/23 Q3 22/23
Number of Food Law written
warnings (letters/reports provided
that contains serious/significant
contravention or numerous
contraventions)
Food Hygiene and Standards 
Any other Food Hygiene and standard notices
served: 
1 Voluntary Food Surrender 
58% of Food Law interventions were
completed in line with the Food Service Plan 
14 Food/non-food Samples
were taken
*Performance indicator forms part of our Place service plan and quarterly performance reporting. Page 96 of 106

Page 97

72
82 7572
82 75
0
20
40
60
80
100
Q1 22/23 Q2 22/23 Q3 22/23
*Number of consumer
complaints
received responded to
33
41 42
0
5
10
15
20
25
30
35
40
45
Q1 22/23 Q2 22/23 Q3 22/23
Number of intelligence logs
received
0
1 1
0
0.2
0.4
0.6
0.8
1
1.2
Q1 22/23 Q2 22/23 Q3 22/23
Number of reports to
Procurator Fiscal
40 39
34
0
5
10
15
20
25
30
35
40
45
50
Q1 22/23 Q2 22/23 Q3 22/23
Number of
inspections/interventions
Trading Standards 
1. Trading Standards assisted Police visits: 
 Visit vape sellers in the Mayfield/Newtongrange/Gorebridge areas on 14 October regarding how they
prevented sales to under-18s etc 
 Attend at two road stops, in Penicuik and at the National Mining Museum, to join mobile patrols covering
most of the county from 25-27 October. These were to check that traders were bona fide and not rogue
traders. 
2. As per every year at fireworks season, Trading Standards were joined by Police and Fire Brigade staff to
visit premises selling fireworks to ensure safe storage and to remind them to ensure only over 18s can
buy them. 
3. Continued to contact residents (12 this quarter), who have responded to scams according to historic
information supplied by the National Scams Team. 
In a separate case, Trading Standards are assisting the National Scams Team to possibly take action against
financial firms who were involved in the sale of multiple warranties to a vulnerable Rosewell resident.  *Performance indicator forms part of our Place service plan and
quarterly performance reporting. Page 97 of 106

Page 98

Page 98 of 106

Page 99

Midlothian Council Report
Quarter Three 2022/23
Progress Against Strategic Outcomes
Individuals and communities in Midlothian will be able to lead healthier, safer, greener and successful lives by 2030. 
No child or household need live in poverty. Midlothian will be a Great Green Place to Grow by achieving our net zero
carbon ambitions.
We are focussing on our new Single Midlothian Plan to reduce the impact of poverty on our most vulnerable.
Midlothian's Child Poverty report 2020 set out Midlothian's commitment to eradicating child poverty by 2030. 
The three drivers for achieving this are: 
• reduce the cost of living
• increase income from employment
• and increase income from social security and benefits in kind
We are also committed to improving health outcomes by working with partners to develop and maintain services
close to home that support the needs of local people
The Climate Emergency Group's values are to get to net zero equitably, taking into account different people and
communities’ capacities and abilities to get there.  Scotland's national target is to be Net Zero by 2045. Following the
motion to Council in 2019, in January 2020 the Community Planning Partnership (CPP) agreed to make meeting the
Climate Emergency target of 'Reducing Midlothian Carbon emissions to net zero by 2030' a priority in its shared
partnership work. 
Whilst a full update for the performance for each of the Council’s Service areas is published separately, this report
reflects an overview of the key service updates, against the thematic areas of the Single Midlothian Plan.
From 1st July 2022,the Community Planning Partnership identified our outcomes which are:
• Individuals and communities have improved health and learning outcomes
• No child or household living in poverty
• Significant progress is made towards net zero carbon emissions by 2030
Single Midlothian Plan Themes in 2022/23
Adult, Health and Care - Achievements
Responding to growing demand for adult social care and health services
Our Vision: People in Midlothian are enabled to lead longer and healthier lives.
Our Values: Right support, right time, right place.  
Midlothian Integration Joint Board plan and direct the services that are delivered by Midlothian Health and Social
Care Partnership (HSCP). The HSCP is a partnership between NHS Lothian and Midlothian Council and is
responsible for services that help Midlothian residents to live well and get support when they need it. This includes all
community health and social care services for adults in Midlothian and some hospital based services such as
Accident and Emergency. 
In order to meet the legal requirements of the Public Bodies (Joint Working) (Scotland) Act 2014, the HSCP was
required to develop, consult on, and publish a new 3 year Strategic Plan in 2022. The new HSCP Strategic Plan for
2022-25 was published in April 2022. 
HSCP COVID-19 Response: The Health and Social Care Partnership, its partners and the communities it services
continued to be impacted by the ongoing effects of the COVID19 pandemic. A recent spike in infections over the
Performance Review and Scrutiny Committee
Tuesday 14 March 2023
Item 5.7
Page 99 of 106

Page 100

winter months coupled with Influenza A cases has caused significant pressure on our workforce due to absences.
The Health and Social Care Partnership has maintained delivery of services and continues to work with its partners
to ensure resources are being managed and deployed to cover staff absences where needed. 
Learning Disabilities:  The Complex Care Expert Panel Group oversees the spending of Midlothian’s Complex Care
Community Fund has now met three times and completed a plan for the Midlothian allocation of Community Change
Fund. This includes allocations for third sector organisations, the development of a Safe House, improvements in
transition for young people moving into adult life, refurbishment of community premises and a programme of training. 
Older People: Extra Care housing: Workforce paperwork is underway with care inspectorate around registration
application for ECH care staffing for Normandy Court Dalkeith. The staffing structure has been approved by HSCP
and we will move to recruitment in the next quarter. A change in handover date has been advised which will now be
approximately May 2023. 
Care at Home: Currently provided by the HSCP and external providers. Care at Home services continue to meet
community needs by allocating new packages of care weekly. Midlothian services continue to experience significant
ongoing recruitment pressures, which are reflected nationally, including recruitment of office-based staff. Despite this
pressure, Care at Home services worked hard to ensure packages of care continued to be delivered.  
Mental Health:  Primary Care 2022 Action 15 developments continues to be postponed still awaiting update from
Scottish Government. 
Strong partnership working continues between Housing, Health and Social care with third sector. Providing support
for individuals with complex needs, through the housing first model. 
Community Safety – Achievements
Ensuring Midlothian is a safe place to live, work and grow up in
Justice: The Justice Team have continued to deliver a range of interventions that fulfil all statutory requirements,
despite managing a number of vacancies across quarter 2 and 3. We continue to ensure that we meet the needs of
those released from custody either on remand or as planned release at sentence end date. There are strong links
with SPS, and HMP Edinburgh in particular, which allows for work to be undertaken as part of the Number 11
allocations meetings to ensure that those leaving custody have access to support and resources relevant to their risk
and needs. 
Substance Misuse: Key services based in Number 11 in Dalkeith continued to provide services including outreach
treatment, injecting equipment provision [IEP], naloxone, and information/advice. Currently, there are challenges with
recruitment. However, the Midlothian Substance Use Service continues to support and treat those individuals who
are most at risk. This includes the provision of Buvidal [an injectable form of Buprenorphine]. 
Getting it Right for Every Midlothian Child - Achievements
Improving outcomes for children, young people and their families
All children, young people, adults and communities in Midlothian are supported to be the best they can be.
This will be achieved through a nurturing, respectful and collaborative approach that promotes wellbeing,
equity, inclusion and lifelong learning. 
The Getting It Right for Every Child Board (GIRFEC) is one of the main drivers for the effective delivery of services to
children. The GIRFEC Plan also known as the Integrated Children’s Service Plan 2020-2023, is a statutory 3 year
plan devised by the local authority and health.  The plan develops key outcomes and priority actions which are
designed to improve the lives of children, young people and families. The GIRFEC outcomes for the final year of the
3 year plan for 2022-23 are: 
1. More children and young people are safe, healthy and resilient
2. More children and young people receive timely and effective mental health support when they need it
3. Inequalities in learning are reduced
4 key areas for improvement have been identified. 
Priority 1 - Attainment and Achievement 
Priority 2 -  Included, Engaged and Involved: Wellbeing and Equity
Priority 3 - Self-Improving Systems
Priority 4 - Lifelong Learning and Employability 
These key areas will be analysed and improvements will be evidenced throughout the year.
Page 100 of 106

Page 101

Improving Opportunities Midlothian - Achievements
Creating opportunities for all and reducing inequalities
Customer Services Strategy The Customer Service Strategy defines the key drivers that will enable Midlothian
Council to deliver a high level of service to our communities. It outlines the commitment to provide choice to the
customer in the way services are accessed and provided. This includes innovation, partnership working and
optimising the use of technology within resource constraints. The strategy will help us to change the way we deliver
services utilising the latest technologies and linking to national frameworks. 
As one of the fastest growing areas in Scotland, the Council cannot support more customers using the current
resources, systems and processes. This means that the adoption of digital and automated processes will be key to
continuing to provide a seamless customer journey, satisfying enquiries at the first point of contact and meeting
increased demand. 
Customer self-service and new automated processes can help deliver some key services without customers dealing
directly with a member of staff and could truly transform the way the Council deliver services. Increasing the pace of
digital transformation, particularly in front-facing customer services, will be a service and corporate priority.
Sport and Leisure:  Gorebridge Leisure Centre: Roof replacement now complete,
Sustainable Growth - Achievements
Growing the local economy by supporting business growth and responding to growing demand for housing in a
sustainable environment
“Place is where people, location and resources combine to create a sense of identity and purpose. The Place
service ambition is to deliver joined-up, collaborative, and participative approaches to services, land and
buildings, across all sectors within a place, enabling better outcomes for everyone and increased
opportunities for people and communities to shape their own lives.”
Over recent years, innovative ways of working have been introduced and services adapted at pace to respond to the
needs of our citizens, in particular those experiencing the greatest levels of poverty and inequality. This has resulted
in a complete transformation of how the Council works. Our services are continuing to build on this learning moving
forward, harnessing the energy, flexibility and creativity demonstrated by our workforce, to embed a culture of
continuous improvement and innovation 
Hub and Spoke, one of Midlothian’s key drivers for change, will see a Locality approach to service delivery adopted,
developed in conjunction with community planning partners. The opportunity to review and redesign services that the
pandemic has provided will result in a more efficient and effective operation of sites within local communities. This
will improve service delivery, and ensure better outcomes for local communities. The continued rollout of enhanced
ICT capabilities will strengthen cross service working, produce resource efficiencies and support the localisation of
services.
Environmental Midlothian Council was one of the first local authorities to sign Scotland’s Climate Change
Declaration, publicly acknowledging the challenges and opportunities that climate change brings with a commitment
to make the Council’s activities net zero carbon by 2030. Work continues to implement the Council’s Climate Change
Strategy and focus continues within Place services to achieve future emissions targets. The ambitious strategy sets
out how we will reduce our greenhouse gas emissions, encourage and work with others in our community to mitigate
and adapt to changing climate. The strategy incorporates an action plan with a number of initiatives and ongoing
programmes which together are helping to reduce our emissions and carbon footprint. 
Economic and Regeneration Midlothian Council’s Economic Renewal Strategy sets out our ambitious approach to
managing the transition from lockdown and planning for the longer term challenges the local economy will face. The
strategy aims to mitigate the adverse economic impact on the local economy from COVID-19. Key aims are to
protect jobs and aid business recovery using a place based partnership approach that maximises the opportunities
developing from the pandemic. Taking this partnership approach, the strategy will foster entrepreneurship, upskilling
and training, addressing gaps in the market and changing the way business is done to better align this to customer
behaviour. Alongside support for agriculture, tourism and the leisure and hospitality sectors, the council will also
promote local jobs and self-employment opportunities, particularly for young people, to give them the necessary skills
and support they need to benefit from economic recovery
Page 101 of 106

Page 102

Procurement - The procurement function has a central role in supporting the Council to achieve its strategic
priorities within a constrained financial envelope. Procurement allows the Council to repurpose its spending power to
drive our key strategic priorities and to secure the best possible value and outcomes for Midlothian. Effective
procurement can maximise the value of every pound spent in terms of jobs, skills and supply chain opportunities in
the local community. We will aim to address economic, social and environmental considerations at all stages of the
procurement cycle within the rules of open, fair and transparent competition. 
Capital Programme:  As Scotland’s fastest growing local authority area, it is critical to delivery that investment in
community infrastructure, such as housing, the learning estate, economic investment and green infrastructure, is in
the right place at the right time. This will help our communities to live well, live locally and prosper. 
How we invest in community infrastructure must also respond to changes in our working and living patterns brought
about by the COVID-19 pandemic. Communities need to be able to readily access the services they require. Capital
investment is also an opportunity to support our local economy through job creation and skills enhancement,
particularly in relation to supporting a transition to a green economy as we invest in sustainable, highly energy
efficient buildings.
As a growing Council, we have the opportunity to transform parts of Midlothian in a way that reflects how we live
now. We will invest in community infrastructure with a focus on place-making, reducing inequalities, improving
economic opportunities and improving education and health and wellbeing outcomes. 
The Capital Investment Strategy brings together many strands of the Council’s activities to build upon our past
successes and drive forward innovation in a co-ordinated and achievable manner for the benefit of Midlothian and its
citizens.
The Capital Investment Strategy sits centrally within the Council’s future planning activities and in doing so has to
reflect the demands of Council services to ensure positive outcomes are achieved in the right place, at the right time
for the maximum benefit to Midlothian.  The extensive capital programme, totalling £0.8bn, delivers new schools, a
record investment in council housing, improved community infrastructure, investment in the local transport network
and innovative developments such as the new low carbon heat network in Shawfair. 
To ensure Midlothian is ‘building back better’, this investment is also creating new jobs, apprenticeship opportunities,
opportunities for businesses and communities and families hard-hit by the impact of COVID-19. These new
opportunities help lead the way out of the pandemic and towards a better future for Midlothian. 
The Education Learning Estate Strategy programme has been developed and is subject to regular review
meetings with Education and stakeholders to ensure effective monitoring, reporting and delivery of improvement
and expansion of the Education estate including Early Years provision. This currently covers approximately 30
projects at various stages of development. 
Digital Strategy and Digital Learning Strategy Supported by the appointment of SOCITIM Advisory (Society for
innovation, technology and modernisation) as a strategic partner and led by the Digital First Board, work progressed
to deliver an ambitious new digital strategy, Digital Midlothian 2021-2023, “Empowering People, Enabling Growth”.
Aimed at improving the way services are delivered to Midlothian citizens, the strategy sets out how local outcomes
will be improved by delivering digital services to digitally connected communities. 
Housing and homelessness Midlothian Council is overseeing a significant housing programme. Phase 1, now
complete, provided 864 additional houses within Midlothian. The total number of new homes from phase 2, 3
and 4 is currently estimated at 1201, comprising of 489 from phase 2 budget and 712 from phase 3 and 4
budgets. Progress during 2022 continues with 661 homes currently being constructed on site either through
commencement of enabling works or main contract works as of November 2022. This includes the largest
Passivhaus programme in Scotland, with 189 homes to be built to the exacting Passivhaus standard, in line with
Midlothian Council’s Net Zero Housing Design Guide. This ensures exceptionally high levels of energy efficiency
and low utility bills for our residents.
Midlothian Council’s updated Rapid Rehousing Transition Plan (RRTP) sets out key actions for delivery in 22/23 and
addresses the next phase in transforming the services provided to meet housing need. These activities are crucial to
reduce the time spent in temporary accommodation, improving the quality of temporary accommodation provided,
continue to deliver Housing First and improve the health and wellbeing of those most vulnerable households. The
plan also explains how Midlothian Council will address the next phase of its approach to transforming the services
provided to those in housing need by developing other initiatives during 2022/23 and into 2023/24, with an emphasis
on the prevention of homelessness, tenancy sustainability and early intervention. 
There continues to be a significant demand placed on homeless and temporary accommodation services. A potential
key challenge will be an increase in homelessness as the financial measures put in place to protect households
Page 102 of 106

Page 103

during the Covid pandemic are now withdrawn, alongside the recent increase in energy, food and fuel costs,
requiring a comprehensive preventative approach as set out in the Council’s Rapid Rehousing Transition Plan.
The first year review of the Homeless Prevention Forum took place this quarter.  This is a partnership arrangement
established 2021, with an aim to reduce children going into homelessness through evictions.  Referrals are triggered
when there is risk of eviction via the arrears and housing services teams within Midlothian Council.  
This quarter the Scottish Housing Regulator met with Housing Services to review and discuss our engagement plan
surrounding homelessness and health and safety within our tenancies. In addition, the Scottish Housing Network
concluded a benchmarking exercise against similar sized Local Authority Housing teams.  Both meetings praised our
material improvements around housing and homelessness and supported the continuation of engagement going
forward.  
Work continues as part of the resettlement scheme to support and provide routes for people who may be fleeing
conflict from a range of different countries. This includes, Afghan Resettlement Schemes, the Homes for Ukraine
Scheme which provides a range of routes for people fleeing the conflict in Ukraine and the Asylum Dispersal
Programme through which people seeking asylum are provided with accommodation in specified nations. The main
activities this quarter are, our third Military of Defence sub-let property in Milton Bridge and we have transformed two
small hostels into large family accommodation in Dalkeith.  We have worked with Social Work Children and Families
to support with responsibilities around Unaccompanied Asylum Seeking Children. 
Challenges and Risks
The 2022/23 budget, approved on 15 February 2022, was reliant on £10.283 million of one off funding measures.
The projected budget gap for 2023/24 is over £14m rising to over £26m by 2027/28. All through Quarter 3 Financial
Services and the Council’s Corporate Management Team have been working with the Business Transformation
Steering Group to consider a range of measures to reduce this gap.
Inflation as well as rising energy costs are affecting the construction industry in Scotland and the UK is currently
experiencing unprecedented adverse market conditions, leading to significant rises in tender prices for a wide range
of materials. There is evidence that inflation of between 10% and 15% beyond BCIS predictions is affecting projects.
The pandemic has also accelerated financial challenges, and the growth from being the fastest growing local
authority in Scotland places significant pressure on Midlothian to be able to deliver services to its citizens.
In order to respond to all of these pressures, a range of reprioritisation activity has taken place in Quarter 3, with a
reprioritised Capital Plan to be presented to Council in Quarter 4, and options to review what services are delivered
and how they are delivered as part of the savings measures to reduce the funding gap.
National Care Service
The estimated funding gap for the next three financial years does not include the associated costs of the Scottish
Government’s National Care Services (Scotland) Bill.  If enacted, the bill would have fundamental implications for the
community and for Local Government itself.  The wide reaching changes in the bill aim to deliver a National Care
Service by the end of the parliamentary term, which will impact on all aspects of the work of the Corporate Solutions
team, including financial implications, in both revenue and capital, our asset base, our workforce, governance and
legal arrangements and our digital infrastructure and platforms. It will require an immediate focus for the foreseeable
future and this will inevitably have implications for other priority work at a time of continued resource constraint.
Cost of Living Crisis
Midlothian’s citizens are facing significant financial challenges. The impact on households is already being noted
across the UK with 87% of adults reporting an increase in their cost of living in April 2022 (Office for National
Statistics; Francis-Devine et al, 2022). The UK is currently facing an unprecedented storm of increasing prices, bills
and tax. The 40 year high inflation rate of 9% is the main driver of the cost of living crisis which has outstripped wage
and benefit increases. The price rises will impact low-income households the hardest as a larger proportion of their
bills are on energy and food. The Resolution Foundation estimates an extra 1.3 million people will fall into absolute
poverty in 2023, including 500,000 children.
As our citizens feel the impact of the Cost of Living Crisis, they will seek additional support from public services; in
particular local authorities. To respond to this emerging crisis, the Council established a Cost of Living Task Force
last year, which is chaired by the Council Leader and meets fortnightly.
Page 103 of 106

Page 104

In Quarter 3, the Council established two ‘Warm and Well’ hubs in the Lasswade and Newbattle libraries, as safe and
warm spaces that all Midlothian citizens can access. The hubs provide free hot food and drinks, the opportunity to
socialise with others and access free wifi to work, study, as well as enjoy books, jigsaws and games.
The Revenues Team is also reporting that the requests for funding remain consistently high, with over £238k
awarded from the Scottish Welfare Fund and 1743 applications for Crisis Grants. These figures are similar to those
seen in Quarter 2 and demonstrate the significant challenge faced by our communities.